Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
205-154
Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. p2~ ~~' - ~~ ~- Well History File Identifier Organizing (done) ^ Two-sided III IIIII II III Illll ^ Rescan Needed III IIIIII II II III III RE AN DIGITAL DATA OVERSIZED (Scannable) Color Items: r~skettes, No. ~ ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: BY: Maria Date: ~~ ~ ^ Other:: /s/ Project Proofing III 111111 IIIII II III BY: Maria Date: ~ ~ ~ /s/ a in aration P S 30 r, = Q + ~ =TOTAL PAGES nn g c rep x (Count does not include cover sheet) BY: Maria Date: /s/ Production Scanning III 114111 IIIII II III Stage 1 Page Count from Scanned File: l!J (Count d oes include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: ~, f '~O~ $ /s! 11~ I (~ rr Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II (II'I II I II II I I III Res~.~~~ iiuiiiiuiigmii BY: Maria Date: /s/ Comments about this file: Quality Checked III II IIII III IIII II 10/6/2005 Well History File Cover Page.doc ~ ~~ ~~~ DATA SUBMITTAL COMPLIANCE REPORT Z~s~zoos Permit to Drill 2051540 Well Name/No. PRUDHOE BAY UN ORIN L-250 L2 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23281-61-00 MD 12635 TVD 4373 Completion Date 12/3/2005 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Surv y Yes DATA INFORMATION Types Electric or Other Logs Run: MWD / GR / RES / Aziuthal DEN / NEU /AIM / PWD Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name ED D Asc Directional Survey c&pt Directional Survey C Lis 15257 Induction/Resistivity Log 15257 Induction/Resistivity ~g 15257 Induction/Resistivity Well Cores/Samples Information: Name Interval Start Stop ADDITIONAL INFORMATION Weil Cored? Y~ Chips Received? ~-N-- Analysis ~-Pd''~ Received? Comments: (data taken from Logs Portion of Master Well Data Maint Log Log Run Interval OH / Scale Media No Start Stop CH Receive d Comments 0 12635 Open 12/7/2005 0 12635 Open 12/7/2005 54 12635 Open 7/3/2007 LIS Veri, GR, ROP, FET, NPHI w/Graphics PDF and Tif 5 Blu 6324 12635 Open 7/2/2007 MD Vision Service BHP 5 Blu 6324 12635 Open 7/2/2007 .~ ~ Vision Servic BHP Sample Set Sent Received Number Comme nts Daily History Received? C~% N Formation Tops ~ N __ __ _ _ ~ _ Compliance Reviewed By: __ _ _ Dater _ ~~~ 07/02/07 Schtura~erger Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Log Description NO.4328 Company: Alaska Oil 8 Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Orion Date BL Color CD L-214A 40013220 OH EDIT MWD/LWD 03/74106 2 1 L-217 40013757 OH EDIT MWDILWD 07/10/06 2 1 L=250L2 40012593 OH EDIT MWDILWD 11/24/05 2 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 Dale Delivered: Bas = ~5~ ~ ! SaS~ Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503.2838 ATTN: Belh Received by; STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COM SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~~~ 0 8 2006 Alaska ilil & Gas Cons. Corr>missiOD 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG 20AAC 25.105 20AAC 25.110 ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1b. Well Class: nC Orag@ ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband, 12/3/2005 i 2. Permit to Drill Number 205-154 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 11/21/2005 13. API Number 50-029-23281-61-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 11/24/2005 14. Well Name and Number: PBU L-250L2 2563 FSL, 3721 FEL, SEC. 34, T12N, R11 E, UM Top of Productive Horizon: 1278' FSL, 2350' FEL, SEC. 27, T12N, R11 E, UM g, KB Elevation (ft): 77.3' 15. Field /Pool(s): Prudhoe Bay Field / Orion Schrader Bluff Total Depth: 4683' FSL, 3098' FWL, SEC. 35, T12N, R11E, UM 9. Plug Back Depth (MD+TVD) 12635 + 4373 Ft 4b. Location of Well (State Base Plane Coordinates): Surface: x- 583195 y- 5978286 Zone- ASP4 10. Total Depth (MD+TVD) 12635 + 4373 Ft 16. Property Designation: ADL 028238 .~___....._______.__ _.______.___~____ _______.._____. TPI: x- _ __584512 _ y- 5982295 Zone-_ASP4 Total Depth: x- 589984 Y- 5980484` Zone- ASP4 11 De th where SSSV set p None MD 17. Land Use Permit: """-" ~"--"--"--_--- """ °"-"-------_" _"""`"" "-"-"~"------"--""-" f t Th f P 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL ickness o erma ros 20. 1900' (Approx.) 21. Logs Run: MWD / GR / RES / Aziuthal DEN / NEU /AIM / PWD 2. ASING, LINER AND EMENTING ECORD CASING ETTlNO EPTH MD ETfINp EPTH TVD HOLE MOUNT ' SIZE WT, PER FT. GRADE OP TTOM OP TTOM SIZE CEMENTING RECORD PULLED , 20" x 34" 215.5# A-53 Surface 108' Surface 108' 48" 60 sx Arctic Set A rox. 10-3/4" 45.5# L-80 29' 3354' 29' 2626' 13-1/2" s sx As Lne, aa2 sx ~~~, 175 sx AS Lite 7-5/8" 29.7# L-80 26' 6391' 26' 4244' 9-7/8" 36 sx Class 'G' 4" x 4-1/2" ~2.saiis.~siio.sx L-80 6386' 12260' 4243' 4352' 6-3/4" Uncemented Excluder Screens 23. Pertorations open to Produc tion (MD + TV D of Top and " " 24. TuBWc RECORD Bottom Interval, Size and Number; if none, state none ): SIZE DEPTH SET (MD) PACKER SET (MD) 4" x 4-1/2" Screen Section 4-1/2", 12.6#, L-80 6356' 6240' MD TVD MD TVD 8262' - 12175' 4276' - 4346' 25. ACID, FRACTURE, `CEMENT'SOUEEZE, ETC.. DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED Freeze Protect w/ 110 Bbls of Diesel 26• PRODUCTION TEST Date First. Production: January 5, 2006 Method of Operation (Flowing, Gas Lift, etc.): Gas Lift Date of Test Hours Tested PRODUCTION FOR TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing PreSS. Casing Pressure CALCULATED 24-HOUR RATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Sub ore chi~s• if none, state "none". None /0 ,~. ~~ 1=1ti~ ~ ~ 2DQIa --~~~~~ Form 10-407 Revised 12/2003 i ~ ~ ~QNTINU~D ON REVERSE SIDE ~t! ~ i ~8. GEOLOGIC MARKEriJ 29' FORMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Schrader Bluff NB 6470' 4262' None Schrader Bluff NC 7908' 4296' Schrader Bluff NC 8008' 4292' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble ~ Title Technical Assistant Date Q~~? /t~~ ` 4-4628 PBU L-250L2 205-154 Prepared By Name/Number• Terrie Hubble, 56 Well Number Permit No. / A royal NO. Drilling Engineer: Michael Trio/o, 564-5774 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only BP EXPLORATION '-Page 1 of 1 Leak-Off Test Summary Legal Name: L-250 Common Name: L-250 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 11/2/2005 LOT 3,384.0 (ft) 2,631.0 (ft) 8.80 (ppg) 470 (psi) 1,673 (psi) 12.24 (ppg) 11/7/2005 FIT 7,449.0 (ft) 4,429.0 (ft) 9.20 (ppg) 300 (psi) 2,417 (psi) 10.50 (ppg) Printed: 12/5/2005 11:10:39 AM B1' EXPLORATION Page ~ of 22 Operations Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 10/23/2005 06:00 - 09:00 3.00 MOB P PRE Move rig, well to well, around well row to L-250 09:00 - 12:00 3.00 MOB P PRE Spot sub base over L-250, lay mats & herculite for mud pits. 12:00 - 13:00 1.00 MOB P PRE Spot mud pits. "Rig accepted for L-250 operations ~ 13:00 hr 10/23/2005 13:00 - 17:00 4.00 RIGU P PRE Change out 16" riser nipple to 20" adapter. NU surface diverter system and riser. 17:00 - 18:00 1.00 RIGU P PRE Prepare rig floor for picking up drill pipe. 18:00 - 23:00 5.00 RIGU P PRE Pick up 105 jts 4' HT-40 drill pipe and rack in derrick. Pick up 24 jts. 4` HT-40 HWDP and rack in derrick. 23:00 - 00:00 1.00 RIGU P PRE Pick up BHA #1 jewelry from beaver slide. 10/24!2005 00:00 - 00:30 0.50 RIGU P PRE Perform diverter function test. 'Witnessing of test waived by AOGCC rep. John Crisp' 00:30 - 03:00 2.50 RIGU P PRE Pick up, make up, 13 1/2" directional drilling assembly. 03:00 - 03:30 0.50 RIGU P PRE Fili hole, check for leaks. 03:30 - 07:00 3.50 DRILL P SURF Spud in L-250 ~ 03:30 hr 10/24/2005. Directionally drill 13 1/2" surface hole from 108' to 280'. 550 gpm, 700 psi on bottom, 425 psi off bottom, 5k WOB, 40 rpm, 1.5k torque, PU - 55k, SO - 53k, ROT - 54k. 07:00 - 12:00 5.00 DRILL N MISC SURF Flowline plugged off. POH to surface. Found chunks of conductor cement in flowline. Clear flowline and RIH to 280'. 12:00 - 12:30 0.50 DRILL P SURF Directionally drill 13 1/2" surface hole from 280' to 360'. 700. gpm, 1200 psi off bottom, 1320 psi on bottom, 60 rpm, 3k torque, 25k WOB. 12:30 - 13:00 0.50 DRILL P SURF POH from 360' to 171'. Pick up jar stand and RIH. 10' fill. 13:00 -00:00 11.00 DRILL P SURF Directionally drill 13 1/2' surface hole from 360' to 1,191'. 700 gpm, 2,000 psi off bottom, 2,170 psi on bottom, 60 rpm, 2k torque off bottom, 5k torque on bottom, 25k WOB. PU - 79k, SO - 71 k, ROT - 73k. AST - 5.08 hrs, ART - 5.72 hrs 10/25/2005 00:00 - 07:00 7.00 DRILL P SURF Directionally drill 13112" surface hole from 1,191' to 1,656'. 700 gpm, 2,350 psi off bottom, 2,500 psi on bottom, 60 rpm, 3k torque off bottom, 5k torque on bottom, 35k WOB. PU - 82k, ~ SO - 71 k, ROT - 74k, AST - 4.3, ART - 2.34. 07:00 - 08:00 1.00 DRILL P SURF Circulate 2X bottoms up. 08:00 - 10:00 2.00 DRILL P SURF RU and RIH with Gyrodate gyro and survey every 100' to 1,500'. RD Gyrodata. 10:00 - 13:30 3.50 DRILL P SURF Monitor well -stable. POH from 1,656'. PU - 90K, SO - 60K. Work through tight spots from 1,052' to 973' and at 790', 580', 525', 425' using pumps as needed. Stand back BHA components and break out the 13-1/2" bit. 13-1/2' MXC-1 graded: 3/5/WT/A/E/1 /RG/BHA. 13:30 - 14:00 0.50 DRILL P SURF MU new 13-1/2" MXC-1, adjust motor bend to 1.5 degrees, orient with MWD and RIH with BHA#2 to 78'. 14:00 - 14:30 0.50 DRILL P SURF Lubricate rig, top drive and crown. 14:30 - 17:00 2.50 DRILL P SURF RIH to 109'. Break connection I~tween the first and second collar and install a stabilizer. RIH. Hit obstruction and pump down from 720' to 1,100' - 700 gpm, 2,050 psi. RIH without pumps from 1,100' to 1,566. Precautionary wash and ream the last stand down to 1,656'. 17:00 - 21:00 4.00 DRILL P SURF Drill ahead directiorlaily from 1,656' to 2,126' - PU - 95K, SO - 67K, ROT • 78K, 80 rpm, TQ on - 5k, TO off - 3k, 2,900 psi on, 2,730 psi off. Encountered hydrates at -1,900' MD. 21:00 -22:00 1.00 DRILL P SURF POH 1 stand. Hydrates breaking out in the pits caused the Printed: 12/5/2005 11:10:45 AM ._ `- BP EXPLORATION Page 2 of 22 O~elrations'Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12!3/2005 Rig Name: NABORS 9ES Rig Number: Date from - To Hours Task Code NPT Phase Description of Operations 10/25/2005 21:00 -22:00 1.00 DRILL P SURF mud pump, desilter pump and mix pump to lock up. Work to get the equipment back to working efficiently. Circulate to ensure proper operation of surface equipment. 22:00 -00:00 2.00 DRILL P SURF Drill ahead directionally from 2,126' to 2,312' - PU - 95K, SO - 67K, ROT - 78K, $0 rpm, TO on - 5k, TO off - 3k, 2,900 psi on, 2,730 psi off. From noon to midnight: AST - 1.1, ART - 2.45. 10/26/2005 00:00 -06:30 6.50 DRILL P SURF Drill ahead directionally from 2,312' to 3,340' (TD) - PU - 103K, SO - 70K, ROT - 84K, 80 rpm, TO on - 9k, TQ off - 5k, 3,180 psi on, 2,830 psi off, AST - 1.65, ART - 3.66. 06:30 - 08:00 1.50 DRILL P SURF Circulate 3X bottoms up -680 gpm, 3,320 psi, 100 rpm. 08:00 - 11:00 3.00 DRILL P SURF Monitor the well -stable. POH from 3,340' - PU - 112K, SO - 72K. Encountered 40K overpull at 1,872'. Work pipe without pumps to get past - no go. Pump out from 1,872' to 1,800' - 330 gpm, 700 psi. POH without pumps from 1,800' to 1,675'. Encountered 40K overpull. Attempt to work by without pumps - no go. Pump out of the hole from 1,675' to 1,657' -hole pulling tight, 40K overpull. 11:00 - 12:00 1.00 DRILL N STUC SURF Attempt to move the pipe down - no go. Torque up on the pipe and attempt to move the pipe down with pumps, 200 gpm, 790 psi - no go. Attempt to jar down wfthout success. Starting to pump mud away. Lost 70 bbls for the tower. 12:00 - 19:30 7.50 FISH N STUC SURF Commence jarring operations. Jar up with 240K and SO to 40K - no success. Pump occasionally to check for returns - lost 20 bbls during the tower. 19:30 - 21:00 1.50 FISH N STUC SURF Inspect the derrick after jarring operations -good. Changeout to long bails. 21:00 -00:00 3.00 FISH N STUC SURF PJSM with Schlumberger E-line. RU rig floor to run Free Point Locator Tool. 10/27/2005 00:00 - 02:00 2.00 EVAL N STUC SURF Run SLB Free Point Locator Tool. Drilllstring appears to be free acres the NMDC below the 9-7/8" Stab. POH. LD FPT. 02:00 -06:00 4.00 FISH N STUC SURF String Shot #1: MU 240 grain string shot and RIH. Apply 1-114 turns to the left in the pipe while making up the string shot and lock in place. Fire string shot across connection at 1,548' - between 9-7/8" Stab and NMDC below the 9-718" stab -did not release. POH with E-line for another string shot. 06:00 - 08:00 2.00 FISH N STUC SURF String Shot #2: MU 480 grain string shot and RIH. Apply 1-1/4 turns to the left in the pipe and lock in place. Fire string shot across connection at 1,548' -between 9-7/8` Stab and NMDC below the 9-7/8" stab -did not release. POH with E-line for another string shot. 08:00 - 10:00 2.00 FISH N STUC SURF String Shot #3: MU 480 grain string shot and RIH. Position string shot across connection at 1,512' -between the NMDC's above the 9-7/8" stab. Apply 1-1/4 turns to the left in tt1e pipe - string broke biind prior to firing string shot. POH and LD string shot #3. Engage ti'ie top drive and retorque drill string. 10:00 - 12:00 2.00 FISH N STUC SURF String Shot #3: MU 480 grain string shot and RIH. Apply 1-1/4 turns to the left in the pipe and lock in place. Fire string shot across connection at 1,512' -between the NMDC's above the 9-7/8" stab -did not release. POH with E-line for another string shot. 12:00 -13:30 1.50 FISH N WAIT SURF Wait on more primer cord to be brought out for string shots. 13:30 - 15:00 1.50 FISH N STUC SURF String Shot #4: MU 560 grain string shot and RIH. Apply 1-1/4 turns to the left in the pipe and lock in place. Fire string shot Printed: 12/5/2005 11:10:45 AM BP EXPLORATION ;'Page 3 of 22'' Operations Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 10/27/2005 13:30 - 15:00 1.50 FISH N STUC SURF across connection at 1,512' -between the NMDC's above the 9-7/8" stab -did not release. POH with E-line for another string shot. 15:00 - 16:00 1.00 FISH N STUC SURF String Shot #5: MU 560 grain string shot and RIH. Apply 1-1/4 turns to the left in the pipe and lock in place. Fire string shot across saver sub at 1,479' -string backed off. POH with E-line. Rotate 5 turns to the left to finish backing out the connection - PU - 90K. 16:00 - 17:00 1.00 FISH N STUC SURF Circulate bottoms up at 1,451' - 715 gpm, 1,600 psi. 17:00 - 18:30 1.50 FISH N STUC SURF POH with 1 stand breaking each connection and re-doping to 1,389'. RD Schlumberger E-line. Change out to short bails. 18:30 - 22:00 3.50 FISH N STUC SURF POH from 1,389' breaking each connection and re-doping - recovered drill string down to the jar stand. BHA#2 remains in the ground from the saver sub to the bit. 22:00 - 23:00 1.00 FISH N STUC SURF PU fishing tools to the rig floor. 23:00 - 00:00 1.00 FISH N STUC SURF RU the rig floor and top drive to PU Fishing BHA. 10/28/2005 00:00 - 03:30 3.50 FISH N STUC SURF PU Fishing BHA components and RIH. Fishing BHA: cut lip guide shoe, drive sub, xo, 2 x bumper sub, jars, xo, 6 x 8" collars, xo, accelerator jar, xo, 9x6-3/4' collars. 03:30 - 08:30 5.00 FISH N STUC SURF RIH with Fishing BHA while PU 5' DP. Ran into tight spot at 1,051'. Wash and ream down to 1,082' -540 gpm, 500 psi, 45 rpm, TO - 3K. 08:30 - 12:00 3.50 FISH N STUC SURF POH from 1,108' to 985'. Hole pulling tight. Run back in the hole to 1,108' and ream out to 980' -220 gpm, 30 rpm, PU - 95K, SO - 88K. POH from 980' standing back DP and collars. LD Fishing BHA. 12:00 - 16:30 4.50 FISH N STUC SURF MU Cleanout BHA and RIH on 5" DP. Cleanout BHA: used 13-1/2" MXC-1, near bit stab, xo, bumper sub, jar, xo, 6 x 8" DC's, xo, 9 x 6-3/4" DC's. Started to take weight at 991'. Ream down to 1,147' - PU - 90K, SO - 80K, ROT - 87K, 60 rpm, 700 gpm, 1,150 psi -suspect open hole sidetrack of the well. 16:30 - 17:30 1.00 FISH N STUC SURF Circulate bottoms up at 700 gpm, 1,150 psi. 17:30 - 21:00 3.50 FISH N STUC SURF " POH standing back 5" DP and LD Cleanout BHA. 21:00 - 22:00 1.00 FISH N STUC SURF Clear and clean the floor. 22:00 - 23:00 1.00 STKOH N STUC SURF Change out the quill, service the top drive and crown. 23:00 - 23:30 0.50 STKOH N STUC SURF Arrange DP in the derrick. 23:30 -00:00 0.50 STKOH N STUC SURF PU 5" DP and stand back in the derrick. 10/29/2005 00:00 - 02:30 2.50 STKOH N STUC SURF PU 5' DP and stand back in the derrick. 02:30 - 05:30 3.00 STKOH N STUC SURF MU BHA#5 and RIH. 8HA#5: 13.5' MXC-1, 9.5' motor 4.5 stg 3R/4S 1.5 degree, nm lead collar, 12.25` nm stab, MWD, 12.25" nm stab, nm xo, nm dc, nm stab, 2 x nm dc's, saver sub, 1 x hwdp, jar, 16 x hwdp. 05:30 -06:00 0.50 STKOH N STUC SURF RIH with BHA#5 on 5" DP from 730' to 1,147'. 06:00 - 07:00 1.00 STKOH N STUC SURF Circulate and condition the mud -300 gpm, 475 psi. 07:00 -18:30 11.50 STKOH N STUC SURF Drill 13.5' directionally as an open hole sidetrack from 1,147' to 3,364'(TD). PU - 115K, SO - 81 K, ROT - 95K, 80 rpm, 700 gpm, 2,300 psi on, 1,950 psi off, 9K TQ on, 5K TO off, AST - 3.68, ART - 4.03. Observed hydrates from 1,800' to TD. 18:30 - 20:30 2.00 STKOH N STUC SURF Circulate 3 x bottoms up - 100 rpm, 700 gpm, 1,850 psi, 5.5K TO. 20:30 - 21:45 1.25 STKOH N STUC SURF POH standing back 5' DP from 3,364' to 1,770' - MW in - 9.5 ppg, MW out - 9.6 ppg. Hole starting to swab. Printed: 12/5/2005 11:10:45 AM BP EXPLORATION Page 4 of 22 Operations Summalry Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 10/29/2005 21:45 - 22:00 0.25 STKOH N STUC SURF Pump out of the hole from 1,770' to 1,657' due to hole trying to swab - 700 gpm, 1,550 psi. 22:00 - 00:00 2.00 STKOH P SURF Pump out of the hole from 1,657' to 730' due to hole trying to swab - 700 gpm, 1,550 psi. 10/30/2005 00:00 - 01:30 1.50 STKOH P SURF RIH from 730' to 3,364'. Precautionary wash and ream the last stand to bottom. Worked pipe with pumps on at 975' and from 1,100' to 1,150' - 575 gpm, 1,000 psi. Worked pipe without pumps from 1,540' - 1,610', 1,740' - 1,760' and 1,800' - 1,810'. 01:30 - 02:00 0.50 STKOH P SURF Circulate and condition the hole - 700 gpm, 1,800 psi, 80 rpm, 6k TO. 01:00 - 02:00 1.00 STKOH P SURF Set clocks back one hour due to daylight savings time. Continue to circulate and condition the hole - 700 gpm, 1,800 psi, 80 rpm, 6k TO. 02:00 -03:15 1.25 STKOH P SURF POH standing back 5" DP from 3,364' to 1,840'. 03:15 -06:30 3.25 STKOH P SURF Hole started to pull -40K over and swab. Backream out of the hole from 1,840' to 730' - 700 gpm, 1,500 psi, 80 rpm, 4k TO. 06:30 -08:00 1.50 STKOH P SURF LD BHA#5. 13-1/2" MXC-1 graded: 2/1JWTJM/E/I/NOlTD 08:00 - 08:30 0.50 STKOH P SURF Clean and clear the floor. 08:30 - 10:00 1.50 STKOH P SURF Change out the top drive saver sub to HT-40. 10:00 - 12:00 2.00 CASE P SURF Change over to long bails and RU the fill-up tool, RU casing handling equipment and make a dummy run with hanger - good. 12:00 - 15:00 3.00 CASE P SURF PJSM. PU 10-3/4" float equipment, Bakerloc connections and RIH. Check floats -holding. PU 10-3/4" 45.5# L-80 BTC casing and RIH to 1,330' -hit obstruction. 15:00 -00:00 9.00 CASE P SURF Hit obstruction at 1,330'. Attempt to work past obstruction without pumps -unsuccessful. Work pipe with pumps on to 1,393' - 425 gpm, 600 psi, PU - 100K, SO - 82K. 10/31/2005 00:00 - 10:00 10.00 CASE P SURF Continue to work pipe from 1,393' to 1,506' - 425 gpm, 600 psi. RIH without pumps from 1,506' to 1,676'. Work pipe from 1,676' to 3,354' -336 gpm, 343 psi. 10:00 - 10:30 0.50 CASE P SURF Circulate and condition the mud through the fillup tool - 420 " gpm, 560 psi. Reciprocated while circulating, PU - 195K, SO - 100K. 10:30 - 11:00 0.50 CASE P SURF RD the fillup tool and RU the cement head. 11:00 - 13:00 2.00 CASE P SURF Circulate and condition the mud. - 460 gpm, 780 psi. Reciprocated while circulating, PU - 195K, SO - 100K. 13:00 - 16:15 3.25 CEMT P SURF Hold PJSM. Line up to Schlumberger and pump 5 bbls of water ahead. Shut down and pressure test the lines to 3,500 psi. Bleed off pressure. Attempt to reciprocate -unsuccessful. Land casing on the ring. Pump 20 bbls of CW 100. Shut down and batch up 10.1 ppg Mudpush Il spacer. Pump 70 bbls of spacer at 7 bpm, ICP -330 psi, FCP -350 psi. Shut down, drop bottom plug and batch 10.7 ppg ArcticSet Lite lead slurry. Pump 551 bbls of lead cement at 8.4 bpm, ICP -500 psi, FCP - 640 psi. Batch up 15.8 ppg Class G tail slurry. Pump 99.5 bbls of tail slurry at 5 bpm, ICP -660 psi, FCP - 740 psi. Shut down, drop top plug and displace with 10 bbls of fresh water. Shut down and swap lines from Schlumberger to the rig. Displace with mud using the rig at 12 bpm, ICP -900 psi. Dropped rate to 4 bpm and bumped the plug to 2,000 psi with 305 bbls pumped and 97% efficiency. Check floats -holding. Had full returns throughout the cement job. NO CEMENT TO Printed: 12/5/2005 11:10:45 AM BP EXPLORATION `Page 5 of 22 Operations Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase bescription of Operations 10/31/2005 13:00 - 16:15 3.25 CEMT P SURF SURFACE. CIP ~ 1548 10/31/2005. 16:15 - 18:00 1.75 CASE P SURF RD casing handling equipment, changeout to short bails and changeout the quill on the top drive. 18:00 - 21:00 3.00 CEMT P SURF MU TAM port collar shifting tool and RIH to 1,000' on 5" DP. Activate the sliding sleeve and expose the circulation ports. 21:00 - 00:00 3.00 CEMT P SURF Circulate and condition the mud - 9 bpm, 155 psi. Wait for materials for 2nd stage cement job. No cement circulated to surface while circulating through the port collar. 11/1/2005 00:00 -00:30 0.50 CEMT P SURF Hold PJSM. Line up to Schlumberger and pump 5 bbls of water ahead. Shut down and pressure test the lines to 3,500 psi. Bleed off pressure. Pump 15 bbls of fresh water. Shut down and batch 10.7 ppg ArcticSet Lite slurry. Pump 140 bbls of lead cement at 7 bpm, ICP - 220 psi, FCP -333 psi. Drop rate to 4 bpm after 96 bbls pumped due to thick, contaminated mud returning to surface, !CP - 140, FCP - i50. Chase the cement with 5 bbls of fresh water to clear the cementing lines. Shut down and swap lines from Schlumberger to the rig. Displace with 15 bbls of mud using the rig at 7 bpm, FCP - 400 psi. Had full returns throughout the cement job. 25 bbls of cement returned to surface. CIP ~ 0030 11/1/2005. 00:30 - 02:30 2.00 CEMT P SURF PU and close the TAM port collar. Verify closure with 1,000 psi pressure test while running tool still across port collar. Apply 314 turn to the right and PU out of the collar. Pressure up and shear the burst disc at 2,400 psi. Observe pressure drop off. Attempt to circulate -unsuccessful -observe pressure increase to 3,100 psi. POH wet standing back 5" DP. LD TAM port collar running tool. Tool appeared to be plugged below the circulation ports. 02:30 -03:00 0.50 CEMT P SURF MU mule shoe and RIH with 5" DP to 1,030'. 03:00 -04:00 1.00 CEMT P SURF Circulate the 5" DP and the casing clean -650 gpm, 150 psi. 04:00 - 05:00 1.00 CEMT P SURF LD 5" DP from 1,030'. 05:00 - 07:30 2.50 CASE P SURF MU 10-3/4" casing pup to the splft landing joint. Attempt to breakout the landing joint with chain tongs -unsuccessful. RU casing tongs and attempt to breakout landing joint - unsuccessful. RD casing tongs and RU rig tongs. Breakout and LD the landing joint. 07:30 - 08:30 1.00 CASE P SURF Clean underneath the rotary table and drain surface lines. 08:30 - 11:00 2.50 BOPSU P SURF ND riser and changeout 20' riser nipple to 16". ND diverter system and secure in the cellar. 11:00 - 12:00 1.00 WHSUR P SURF Bring wellhead equipment into the cellar area. 12:00 - 17:00 5.00 BOPSU P SURF Install speed head and tubing spool. Test to 1,000 psi -good. Install secondary annulus valves. NU BOP stack and riser. Flush stack. 17:00 - 17:30 0.50 BOPSU P SURF RU BOP testing equipment. 17:30 -20:30 3.00 130PSU P SURF Test BOPE and related equipment to 250 psi low and 3,500 psi high. No failures during the test. Test was witnessed by Jeff Jones of the AOGCC, Nabors Rig Supervisor Roy Hunt and BP Wellsite Leader James Franks. 20:30 - 21:00 0.50 BOPSU P SURF Blow down all surface lines and RD testing equipment. Install wear ring. 21:00 -22:00 1.00 DRILL P SURF RIH with 5" DP and HWDP from the derrick. 22:00 -00:00 2.00 DRILL P SURF LD 5' DP and HWDP. 11/2/2005 00:00 - 01:00 1.00 DRILL P SURF Continue to LD 5' DP. Printed: 12/5!2005 11:10:45 AM 'BP'EXPLORATION Page s of 22 Opelrations Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING 1 Rig Release: 12/3/2005 Rig Name: NABORS 9ES Rig Number: Date From- To Hours Task Code NPT Phase Description of Operations- 11/2/2005 01:00 - 02:00 1.00 DRILL P INT1 PU 4" DP and RIH. 02:00 - 02:30 0.50 DRILL P INT1 Stand back 4' DP in the derrick. 02:30 - 09:00 6.50 DRILL P INT1 PJSM. MU BHA#6. Orient the MWD. Hold PJSM prior to loading nuclear source. RIH with BHA and rotate at 8 rpm to get past the TAM port collar at 1,000'. RIH to 1,095'. Flow test the MWD ~ 600 spm, 1,032 psi -good. Test the 10-3/4' casing to 1,000 psi to verify the port collar is closed. BHA #6: 9-7/8" Hycalog DSX199GUW, 8-1/4" motor 4R/5S 5.3 stg 1.5 degree, xo nm stab, ARC, MWD, ADN, nmdc, LWD (Sperry MIRL), 1 x 5" HWDP, jar, 1 x 5" HWDP, xo, 24 x 4" HWDP. 09:00 - 10:00 1.00 DRILL P INT1 Slip and cut drilling line. Inspect brakes. Service the top drive. 10:00 - 13:00 3.00 DRILL P INT1 RIH with BHA#6 on 4" DP to 2,031'. Crossover and add Weatherford Ghost Reamer.to the drillstring. Crossover and continue to RIH with 4" DP from the derrick to 3,160'. 13:00 - 14:00 1.00 CASE P SURF RU to test 10-3/4" 45.5# L-80 BTC surface casing. Pressure test casing to 3,500 psi -chart and hold for 30 minutes -good test. 14:00 - 14:30 0.50 DRILL P INT1 Wash down from 3,160' and tag cement at 3,248'. Drill out the float equipment and 20' of new hole to 3,384' - PU - 115K, SO - 62K, 550 gpm, 1,150 psi, 60 rpm. 14:30 - 15:30 1.00 DRILL P INT1 Displace the well over to new 8.8 ppg LSND drilling fluid. 15:30 - 16:00 0.50 DRILL P INT1 Place the bit inside the surface casing shoe at 3,354'. Conduct an LOT of the surface shoe with 8.8 ppg fluid, 470 psi surface pressure fora 12.24 ppg EMW LOT. 16:00 - 00:00 8.00 DRILL P INT1 Drill 9-7/8" directionally from 3,384' to 4,371'. PU - 125K, SO - 75K, ROT - 88K, 80 rpm, 580 gpm, 2,050 psi on, 1,800 psi off, TO on - 8K, TO off - SK, AST - 1.77, ART - 3.31. 11/3/2005 00:00 - 12:00 12.00 DRILL P INT1 Drill 9-7/8' directionally from 4,371' to 5,956'. PU - 140K, SO - 84K, ROT - 104K, 80 rpm, 590 gpm, 2,390 psi on, 2,275 psi off, TO on - 8K, TD off - 5K, AST - 2.38, ART • 5.88. Pumped " a high visc sweep at 5,125' -returned -10% additional cuttings. 12:00 -00:00 12.00 DRILL P INT7 Drill 9-7/8' directionally from 5,956 to 8,890'. PU - 122K, SO - 87K, ROT - 105K, 80 rpm, 590 gpm, 2,480 psi on, 2,260 psi off, TO on - 8K, TO off - 5K, AST - 7.08, ART - 2.48. Pumped a high visc sweep at 6,000' -returned -25% additional cuttings. 11/4/2005 00:00 - 05:00 5.00 DRILL P INT1 Drill 9-718' directionally from 6,890' to 7,429' (TD). PU - 130K, SO - 90K, ROT - 102K, 80 rpm, 590 gpm, 2,700 psi on, 2,2570 psi off, TQ on - 7K, TO off - 5K, AST - 2.13, ART - 1.68. 05:00 - 05:30 0.50 DRILL P INT1 Circulate open hole volume, 9.2 ppg fluid going in and coming out. 05:30 -06:00 0.50 DRILL P INT1 Drop 2-3/8" hollow rabbit and circulate down at 230 gpm, 770 psi. 06:00 -15:00 9.00 DRILL P INT1 MAD pass log from 7,429' to 5,760' - 585 gpm, 2,500 psi, 80 rpm, 6k TQ. 15:00 - 19:00 4.00 DRILL P INT1 Backream from 5,760' to 3,354' (surface casing shoe) -585 gpm, 2,300 psi, 80 rpm, 6k TD. 19:00 - 19:30 0.50 DRILL P INT1 Circulate and condition mud at the casing shoe - 585 gpm, 1,800 psi, 80 rpm, 4k TQ. 19:30 - 21:00 1.50 DRILL P INT1 POH standing back 4" from 3,354' to 266'. 21:00 - 00:00 3.00 DRILL P INTi PJSM. LD BHA#6. LD 1 x 5' HWDP, jar and 1 x 5' HWDP. Download Sperry MRIL and LD. LD nm dc. Remove nuclear Printed: 72/5/2005 11:10:45 AM BP EXPLORA?ION Page 7 0# 22' Operations Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABORS 9ES Rig Number: Date. From - To Hours Task Code NPT Phase Description of Operations 11/4/2005 21:00 - 00:00 3.00 DRILL P INT1 source. LD ADN, MWC, ARC, nm stab, xo, motor and 9-7/8" bit. 9-7/8" Hycalog DSX199GUW graded: 1/3/WT/A/X/I/CTlfO. 11/5/2005 00:00 - 00:30 0.50 DRILL P INT1 Clean and clear the floor. 00:30 - 06:00 5.50 EVAL P INT1 PJSM. RIH with 45 sidewalt coring barrels on 4" DP to 5,200'. Break circulation every 1,000' in casing and every 5 stands in OH. 06:00 - 08:00 2.00 EVAL P INT1 RU side-der entry sub and wireline on rig floor. RIH with wireline and latch up. Function test wireline tools -good. 08:00 - 10:00 2.00 EVAL P INT1 RIH with SWC and wireline on 4" DP from 5,200' to 7,200'. 10:00 - 12:00 2.00 EVAL P INT1 Correlate SWC with logs from 7,200' to 7,023'. RIH to 7,278'. 12:00 - 14:30 2.50 EVAL P INTi POH from 7,278' taking sidewalt cores - 1st shot taken at 7,228', 45th shot taken at 5,406'. Log out of the hole to 5,223'. 14:30 - 15:30 1.00 EVAL P INT1 POH with wireline and RD wireline tools on the rig floor. 15:30 - 17:30 2.00 EVAL P INTi Circulate and condition the hole - 210 gpm, 290 psi, 9.2 ppg mud going in and coming out. 17:30 - 20:00 2.50 EVAL P INTi POH standing back the 4" DP and 4" HWDP. 20:00 - 20:30 0.50 EVAL P INTi LD gamma ray tool and sidewalt cores. Recovered 45 core barrels and 43 of 45 samples -one misfire and one barrel filled with mud. 20:30 - 23:00 2.50 BOPSU P INT1 Drain the BOP stack and flush with water. Pull wear ring and install test plug with landing joint. Change out the top set of rams to 7-5/8" and test to 250 psi low 13,500 psi high -good. RD testing equipment and pull test plug. 23:00 - 23:30 0.50 CASE P INTi PU landing joint and casing hanger. Make a dummy run and mark pipe. LD landing joint and casing hanger. 23:30 - 00:00 0.50 CASE P INT1 RU the rig floor to run 7-5/8" casing. Changeout to long bails. 11/6/2005 00:00 - 01:30 1.50 CASE P INT1 RU the rig floor to ruri 7-5/8' casing. 01:30 - 20:00 18.50 CASE P INT1 Hold PJSM. PU 7-5/8" 29.7# L-80 BTC-M shoe track and RIH. Bakeriok alt shoe track connections. Check floats -holding. PU 7-5/8' 29.7# L-80 BTC-M casing joints artd RIH. Space out pups and run centralizers per running order. Utilize BOL NM " thread lubricant and torque to mark with 8,000 fflbs. Fill every joint while running in. Break circulation for 5 minutes every 10 joints while in the casing and for 15 minutes every 15 joints in the open hole. Circulate a bottoms up at 5,547' - 250 gpm, 388 psi. land hanger with float shoe ~ 7,418' - PU - 200k, SO - 115k. Float shoe: 7,418' Float collar: 7,332' Top of L1 window joint: 6,589' L1 RAT tag: 6,547' Top of L2 window joint: 6,379' L2 RAT tag: 6,337' Ran a total of 179 joints of 7-518' 29.7# L-80 BTC-M casing, 97 centralizers and 31 stop rings 20:00 - 20:30 0.50 CASE P INT1 LD the Franks flllup tool and RU the Schlumberger double plug cement head. 20:30 - 21:30 i.00 CEMT P INTi Circulate and condition mud for cement job. Reciprocate pipe while circulating. 21:30 -00:00 2.50 CEMT P INT1 Hold PJSM with Schlumberger and rig personnel. Continue to Printed: 12/5!2005 t 1:10:45 AM BP EXPLORATION Page 8 of 22 Opera#ions Summaily Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABOBS 9ES Rig Number: .Date From - To Hours 'Task Code NPT Phase Description of Operations 11/6/2005 21:30 -00:00 2.50 CEMT P INTi circulate while Schlumberger batched up cement. Continue to reciprocate. 11/7/2005 00:00 - 02:00 2.00 CEMT P INT1 Line up to Schlumberger and pump 5 bbls of fresh water ahead. Shut down and pressure test the lines to 3,500 psi - good. Pump 25 bbls of CW 100 followed by 50 bbls of 10.5 ppg Mudpush II spacer at 4 bpm, ICP - 220 psi, FCP - 175 psi. Drop bottom plug. Chase plug with 69 bbls of 15.8 ppg Gasblok slurry at 5 bpm, ICP - 270 psi, FCP - 200 psi. Switch to 16.5 ppg DuraSTONE on the fly and pump 67 bbls at 6 bpm - ICP - 260 psi, FCP - 250 psi. Shut down and drop the top plug. Kick the plug out with 10 bbls of fresh water. Shut down and pump remainder of displacement with the rig pumps. Pumped seawater at 7 bpm, ICP - 100 psi, FCP - 800 psi. Reduce rate to 4 bpm after 294 bbls pumped, ICP - 600 psi, FCP - 700 psi. Reduced rate to 2 bpm after 326 bbls pumped, ICP - 650 psi, FCP - 700 psi. Bumped the plug with 332 bbls of seawater, 95% efficiency and with 2,000 psi -hold for 5 minutes. Bleed off pressure and check floats -holding. Good lift and full returns seen throughout entire job. Pipe was reciprocated until 276 bbls into the displacement when it was landed on the hanger. Cement in place on 11/7/2005 ~ 0145 hours. 02:00 - 03:30 1.50 CEMT P INTi LD the cement head and the landing joint. Flush stack. Change long bails to short bails. RD casing handling equipment. Clean and clear tt1e rig floor. 03:30 -04:30 1.00 CASE P INT1 Install packoff and test to 5,000 psi -good. 04:30- 06:30 2.00 BOPSU P INT1 Changeout the top rams from 7-5/8' to 3-1/2" x 6' variables. RU testing equipment. Test door seals to 3,500 psi. RD testing equipment. 06:30 - 07:00 0.50 DRILL P PROD1 Hold PJSM to pick up BHA#7 -6-3/4" BHA. 07:00 - 09:30 2.50 DRILL P PRODi MU BHA#7 and RIH. BHA components: 6-3/4' Hycalog DS146, 4-3/4" AIM motor - 1.5 degree - 4R/5S - 6 stg, bypass sub with float, nm stab, MWD/LWD, PWD, ADN, 2 x nm dc's, " circ sub, xo, 1 x 4' DP, jars and 1 x 4' DP. 09:30 - 12:00 2.50 DRILL P PRODi PU 4" DP singles and RIH with BHA#7 to 2,383'. Simops: Perform LOT down the 7-5/8" x 10-3/4' annulus - 12.09 ppg EMW. Inject 135 bbls of 9.2 ppg LSND drilling fluid to clear the annulus - 3 bpm, 600 psi. 12:00 - 15:00 3.00 DRILL P PROD1 PU 4' DP from 2,383' to 6,199'. 15:00 -15:30 0.50 DRILL P PROD1 RIH with BHA#7 on 4" DP from the derrick. 15:30 - 16:30 1.00 CASE P PROD1 Line up and pressure test the casing to 3,500 psi. Chart and hold for 30 minutes -good test. 16:30 - 17:30 1.00 DRILL P PROD1 Cut and slip drilling tine. Inspect brakes. Service and lubricate the top drive. 17:30 - 18:00 0.50 DRILL P PROD1 Ready the rig floor for MOBM. 18:00 -19:00 1.00 DRILL P PROD1 Wash down and tag up on cement at 7,273'. Drill cement and shoe track down to 7,414' - PU - 160k, SO - 80k, TO - 8.5k, 290 gpm, 60 rpm, 1,880 psi. 19:00 - 20:30 1.50 DRILL P PROD1 Pump 50 bbls spacer and displace the well over to 9.2 ppg MOBM. 20:30 - 21:00 0.50 DRILL P PROD1 Drill remainder of the shoe track, rathole and 20' of new formation to 7,449' Printed: 12/5/2005 11:10:45 AM BP EXPLORATION Page 9 of 22 Operations Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABORS 9ES Rig Number: Date from - To Hours Task Code NPT -Phase Description of Operations 11/7/2005 21:00 - 21:30 0.50 DRILL P PROD1 Circulate and condition fluid. Pull bit inside the casing shoe at 7,418'. 21:30 -22:00 0.50 DRILL P PROD1 Perform F1T with 9.2 ppg MOBM fluid, 300 psi surface pressure and 4,429' TVD for 10.5 ppg EMW. 22:00 - 23:00 1.00 DRILL P PROD1 Circulate and obtain baseline ECD readings -calculated ECD - 10.14ppg, actual ECD - 10.13 ppg. 23:00 -00:00 1.00 DRILL P PROD1 Drill 6-3/4" hole directionally from 7,449' to 7,508', PU - 125k, SO - 90k, ROT - 100k, TO - 4k, 290 gpm, 2,655 psi on, 2,500 psi off. AST - 0.35, ART - 0.15. 11/8/2005 00:00 -00:00 24.00 DRILL P PROD1 Drill 6-3/4' hole directionally from 7,508' to 9,092', PU - 140k, SO - 60k, ROT - 100k„ 60 rpm, TO - 5.9k, 301 gpm, 2,925 psi on, 2,560 psi off. AST - 9.13, ART - 4.12. CECD - 10.23, AECD - 10.81. Crossed unexpected 20' fault d~ 8,567' MD, 4,437' TVD. Drilled out of OA fop ~ 8,777' MD, 4,443' TVD. Turn down and drill ahead per Geology to find and confirm top of OA. Simops: Freeze Protect the 7-5/8" x 10-3/4" annulus with 105 bbls of dead crude. 11/9/2005 00:00 - 01:00 1.00 DRILL P PROD1 Drill 6-3/4' hole directionally from 9,092' to 9,186', PU - 143k, SO - 56k, ROT - 95k, 60 rpm, TQ - 5.9k, 300 gpm, 2,925 psi on, 2,550 psi off. CECD - 10.15, AECD - 10.75. AST - 0.00, ART - .74 Top of OA ~ 9,125' MD, 4,453' 1'VD "TD 6.75' OA Target 63! 9,186' MD, 4,465' TVD, 1119/05, 01:00 hr 01:00 - 02:00 1.00 DRILL P PROD1 Circulate bottoms up for ECD's. 250 gpm, 2,100 psi, 60 rpm, TO - 5.3k CECD - 10.14, AECD - 10.74. ECD's straight lined ~ 10.74 with 1.5 x bottoms up. Shakers clean. MW - 9.2 ppg 02:00 -09:00 7.00 DRILL P PROD1 Mad pass, backream from 9,186' to 7,976 ~ 300 fph'. 60 rpm, TO 5.6k, 260 gpm, 2,225 psi. 09:00 - 10:30 1.50 DRILL P PROD1 Mad pass, backream from 7,976' to 7,418' ~ 600 tph'. 60 rpm, TO 5.6k, 260 gpm, 2,225 psi. 10:30 - 11:00 0.50 DRILL P PRODi Service top drive and crown, monitor well. 11:00 - 12:00 1.00 DRILL P PROD1 RIH from 7,418' to 9,186' 12:00 - 15:00 3.00 DRILL P PROD1 Circulate bottoms up. 300 gpm, 2850 psi, 60 rpm, TO - 5.8k. Displace well with 9.2 ppg SFMOBM. 15:00 - 20:00 5.00 DRILL P PRODi Monitor well. POH from 9,186' to 236'. 20:00 -22:00 2.00 DRILL P PROD1 Lay down 6.75" drilling BHA #7. 22:00 -22:30 0.50 DRILL P PROD1 Clean rig floor, clear floor of vendor tools. 22:30 -00:00 1.50 CASE P RUNPRD Rig up to run 4.5' 12.6# L-80 BTC /IBT, Slotted /Solid liner assembly. 11/10/2005 00:00 -03:00 3.00 CASE P RUNPRD PJSM. RIH with 4.5" slotted liner assembly to 1,954'. Used Best-O-Life pipe lubricant. BTC TO - 3,600 fUlbs, IBT TO - 6,000 fUlbs. PU - 55k, SO - 51 k. Ran total of 19 Jts 4.5" 12.6# L-80 IBT solid liner 23 Jts 4.5` 12.6# L-80 BTC slotted liner 2 crossover Jts IBT x BTC Shoe set f~ 8,632' Printed: 12/5/2005 11:10:45 AM BP EXPLORATION 'Page 10 ofi 22' Opera#ions Summary Report... Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING 1 Rig Release: 12/3/2005 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Qperations 11/10/2005 00:00 - 03:00 3.00 CASE P RUNPRD FC set ~ 8,587' 4.5' x 6.3" Swell Packer set ~ 8,521' - 8,531' 7.625' x 5.5" Baker ZXP Liner Top Packer set ~ 6,704' Liner Top set ~ 6,693' 28 HES 4.5" x 5.75` x 8" centralizers as follows: 1 ea, locked on top of shoe, 1 ea above and below swell packer, tea on jts 1-25 03:00 - 12:30 9.50 CASE P RUNPRD RIH with 4.5" slotted liner assembly on 4' HT-40 drill pipe to 8,632' ~ 90 fpm, filling every stand. 12:30 - 13:00 0.50 CASE P RUNPRD Set hanger with 2,000 psi, set down 25k. Set packer with 3,200 psi, bleed to 0 psi. Pressure test packer with 1,500 psi - 5 min - OK. Release liner setting tool. Pressure up to 1,000 psi and pull out of seals. Pressure bled to 0 psi 13:00 - 13:30 0.50 CASE P RUNPRD Circulate bottoms up ~ 270 gpm, 1110 psi, PU - 115k, SO - 185k. 13:30 - 17:30 4.00 CASE P RUNPRD POH from 6,632'. Lay down running tool. 17:30 - 18:00 0.50 STWHIP P WEXIT Pick up whipstock tools to rig floor. 18:00 - 21:00 3.00 STWHIP P WEXIT Pick up, make up whipstock assembly. 21:00 -00:00 3.00 STWHIP P WEXIT RIH with whipstock assembly on 4" HT-40 drill pipe. 11/11/2005 00:00 - 01:30 1.50 STWHIP P WEXIT RIH with whipstock assembly to 6,521 ~ 50 fpm 01:30 - 02:00 0.50 STWHIP P WEXIT Orient whipstock to 20L from highside. PU - 137k, SO - 86k 02:00 - 02:30 0.50 STWHIP P WEXIT RIH and tag top of tieback sieave ~ 6,693.5'. Set trip anchor with 10k, pick up 5k over to verify. Set down 20k and shear mills for whipstock. Test backside to 1,500 psi - 5 min - OK. 02:30 - 03:30 1.00 STWHIP P WEXIT Displace well from 9.2 ppg SFMOBM to 9.2 ppg MOBM ~ 300 gpm, 2,200 psi. Obtain slow pump rates. 03:30 - 07:30 4.00 STWHIP P WEXIT Mill window from 6,606' to 6,618'. 325 gpm, 2,480 psi, 60 rpm, TO - 5k. 07:30 - 08:30 1.00 STWHIP P WEXIT Drill 17' of new hole from 6,618' to 6,635'. 331 gpm, 2,525 psi, 80 rpm, TO - 5k, WOB - 3-5k, PU -137k, SO - 86k, RW - 96k. 08:30 -09:30 1.00 STWHIP P WEXIT Pump 45 bbl high vis sweep surface to surface ~ 330 gpm, 2,520 psi, 60 rpm, TO - 4.1 k. Work mills through window while circulating. 09:30 - 13:00 3.50 STWHIP P WEXIT POH from 6,606' to 461'. MW - 9.2 ppg, PU - 132k, SO - 88k. 13:00 - 14:30 1.50 STWHIP P WEXIT Lay down 43/4' DC's and milling assembly BHA #8. 14:30 - 15:00 0.50 STWHIP P WEXIT Clean and clear rig floor, lay down vendor tools. 15:00 - 16:00 1.00 STWHIP P WEXIT Flush and function BOP stack. 16:00 - 16:30 0.50 STWHIP P WEXIT Rig up to test BOPE. Pull wear bushing, install test plug. 16:30 - 20:30 4.00 STWHIP P WEXIT Test BOPE and floor related equipment to 250 psi low pressure - 5 min each, 3,500 psi high pressure - 5 min each. Witnessing of test waived by AOGCC rep Lou Grimaldi. Test witnessed by BP reps Alan Madsen, Robert French and NAD Toolpushers Bill Bixby, Brian Tiedemann. 20:30 - 21:00 0.50 STWHIP P WEXIT Rig down ROPE test equipment. Blow down lines, pull test plug, instals wear bushing. 21:00 - 23:00 2.00 STWHIP P WEXIT Change out lower IBOP on top drive. Test same to 250 psi, 3,500 psi. 23:00 - 23:30 0.50 STWHIP P WEXIT Service top drive. 23:30 -00:00 0.50 DRILL P PROD2 PJSM for BHA. Pick up tools for BHA #9. 11/12/2005 00:00 - 01:00 1.00 DRILL P PROD2 Pick up, make up 6.75" directional drilling assembly. (BHA #9) Orient tools. 01:00 - 02:00 1.00 DRILL P PROD2 PJSM on nuclear source. Make up same and complete make Printed: 72/5/2005 17:70:45 AM 'BP EXPLORATION Page 11 of 22 Operations Summairy Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT ' Phase Description of Operations 11/12/2005 01:00 - 02:00 1.00 DRILL P PROD2 up of BHA. 02:00 - 05:00 3.00 DRILL P PROD2 RIH with BHA #4 on 4° HT-40 drill pipe to 6,576'. Shallow hole tested MWD ~ 1167'. 05:00 -06:30 1.50 DRILL P PROD2 Circulate and condition mud. Obtain benchmark ECD's, 10.47 ppg non-rotating, 10.68 ppg rotating. 300 gpm, 2560 psi, 60 rpm, TO - 3.5k. Orient high side and run bit through window. PU - 125k, SO - 90k. 06:30 - 12:30 6.00 DRILL P PROD2 Directionally drill from 6,635' to 7,038'. 300 gpm, On psi - 3,100, Off psi - 2,800, rpm - 60, TO off - 4.4k, TQ on - 5.Sk. Calc. ECD - 10.65 ppg, Act. ECD - 10.83 ppg. AST - 1.27 hr, ART - 2.44 hr. The resistivity tool working intermittently. Mad passed from 6,843' to 6,946'. 12:30 - 13:00 0.50 DRILL P PROD2 Circulate bottoms up for trip for LWD ~ 300 gpm, 2,650 psi. 13:00 - 16:30 3.50 DRILL P PROD2 Montor well. PU - 143k, SO - 72k, mud weight - 9.2 ppg. POH to 6,550'. Drop ball and open circulating sub (sheared ~ 2,270 psi). Pump 15 bbls. of 11.2 dry job. Continue POH from 6,550 to 417'. 16:30 - 18:00 1.50 DRILL P PROD2 PJSM on nuclear source. Lay down BHA #9. 18:00 - 19:00 1.00 DRILL P PROD2 Change out washpipe on top drive. 19:00 - 20:30 1.50 DRILL P PR002 PJSM on nuclear source. Pick up, make up 6.75' directional drilling assembly. {BHA #10) Orient tools. 20:30 - 23:00 2.50 DRILL P PROD2 RIH with BHA #4 on 4" HT-40 drill pipe to 6,118'. Shallow hole tested MWD ~ 1168'. 23:00 - 23:30 0.50 DRILL P PROD2 Service top drive, grease crown sheaves. 23:30 - 00:00 0.50. DRILL P PROD2 Cut and slip drilling line 72' 11/13/2005 00:00 - 00:30 0.50 DRILL P PROD2 Continue cut and slip drilling line. Clean under drawworks and inspect brakes. 00:30 - 01:00 0.50 DRILL P PROD2 RIH from 6,118' to 6,818'. 01:00 - 02:00 1.00 DRILL P PROD2 RIH from 6,818' to 7,038' taking 30' surveys. 02:00 -04:00 2.00 DRILL P PROD2 Directionally drill from 7,038' to 7,319'. PU - 130k, SO - 76k, ROT - 97k, WOB - 5k, 304 gpm, 2,780 psi off, 2820 psi on, 40 rpm, 4k TO off, 5k T© on. CECD 10.19 ppg, AECD 10.8 ppg 04:00 -04:30 0.50 DRILL P PROD? Circulate for ECD's. Act ECD from 10.8 ppg to 10.6 ppg. 04:30 -00:00 19.50 DRILL P PROD2 Directionally drill from 7,319' to 9,184'. PU - 137k, SO - 70k, ROT - t00k, WOB - 5-15k, 300 gpm, 2,920 psi off, 3,070 psi on, 60 rpm, 6.2k TO off, 7.5k TO on. CECD 10.34 ppg, AECD 10.97 ppg. AST - 5.26 hrs, ART - 4.01 hrs. Backream each stand. Survey every 30'. 11/14/2005 00:00 -06:00 6.00 DRILL P PROD2 Directionally drill from 9,184' to 9,930'. PU - 137k, SO - 67k, ROT - 98k, WOB - 5-15k, 300 gpm, 2,990 psi off, 3,100 psi on, 60 rpm, 6.2k TO off, 7.Sk TO on. CECD 10.44 ppg, AECD 11.12 ppg. Backream each stand. Survey every 30'. 06:00 - 07:00 1.00 DRILL P PROD2 Clean frost from top drive blower intake due to low air flow. 07:00 -00:00 17.00 DRILL P PROD2 Directionally drill from 9,930' to 11,050'. PU - 160k, SO - 36k, ROT - 79k, WOB - 5-15k, 300 gpm, 3,015 psi off, 3,180 psi on, 60 rpm, 7.8k TQ off, 9.1 k TO on. CECD - 10.77 ppg, AECD - 11.19ppg. AST - 3.74 hrs, ART - 6.11 hrs. Backream each stand. Survey every 30'. 11/15/2005 00:00 - 01:00 1.00 DRILL P PROD2 Directionally drill from 11,050' to 11,184'. PU - 160k, SO - 48k, ROT - 98k, WOB - 10k, 300 gpm, 3,130 psi off, 3,500 psi on, 60 rpm, 8.6k TO off, 9k TQ on. CECD - 10.64 ppg, AECD - 11.55 ppg. Backream each stand. Survey every 30'. 01:00 -03:00 2.00 DRILL P PROD2 Not able to orient or slide. CBU for ECO's. CECD - 10.64 ppg, Printed: 12/5/2005 11:10:45 AM BP EXPLORATION Page 12 of 22 Operations Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10!24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABORS 9ES Rig Number: Date. From - To Hours Task Code NPT Phase Description of Operations 11/15/2005 01:00 - 03:00 2.00 DRILL P PROD2 AECD - 11.55 ppg. Circulated to ECD of 11.2 ppg. Circulate 15 bbls 11.5 ppg weighted sweep surf -surf. 300 gpm, 3,180 psi, 60 rpm, 8.2k TO, PU - 100k, SO 77k. AECD after sweep - 11.05 ppg. Sweep returned 5-10°/° increase in cuttings. 03:00 - 06:00 3.00 DRILL P PROD2 Directionally drill from 11,184' to 11,423'. PU - 170k, SO - 36k, ROT - 97k, WOB - 15k, 300 gpm, 3,060 psi off, 3,450 psi on, 60 rpm, 8.1 k TO off, 9.3k TO on. CECD - 10.56 ppg, AECD - 11.34 ppg. Backream each stand. Survey every 30'. TD L-250 L1 NB ~ 11,423' MD, 4,323' TVD ~ 06:00 hr 11 /15/2005. 06:00 - 07:00 1.00 GRILL P PROD2 Circulate bottoms up. 300 gpm, 3,060 psi, 60 rpm, Sk TO. 9.2 ppg MW, CECD -11.05 ppg, AECD - 11.34 ppg. 07:00 - 12:00 5.00 DRILL P PROD2 Backream /Madpass log, 600 fph from 11,423' to 10,489'. 297 gpm, 3,070 psi, 60 rpm, 8-10k TO, PU - 98k. CECD - 10.56 ppg, AECD - 11.02 12:00 - 14:00 2.00 DRILL P PROD2 Difficulty going back down to set tool joints in position for connections. Slowdown Madpass logging to 200 fph in shales from 10,489' to 10,023'. 300 gpm, 2,990 psi, 60 rpm, Sk TO. 14:00 - 20:30 6.50 DRILL P PROD2 Backream /Madpass log, 600 fph from 10,023' to 7,850. Started to have minor packoffs. CECD - 10.04 ppg, AECD - 10.72 ppg. 20:30 -00:00 3.50 DRILL P PROD2 Backream /Madpass log, from 7,850' to 7,800. Slow down as needed to control packoffs & ECD's. 275 gpm, 2,240 psi, 55 rpm, 5.5k TO. CECD - 10.04 ppg, AECD - 10.62 ppg f 1/16/2005 00:00 -04:00 4.00 DRILL P PROD2 Backream 1 Madpass log, from 7,800' to 7,497. Slow down as needed to control packoffs & ECD's. 275 gpm, 2,260 psi, 60 rpm, 5k TO. CECD - 10.04 ppg, AECD -10.56 ppg 04:00 - 07:00 3.00 DRILL P PROD2 Backream /Madpass log, 600 fph from 7,497' to 6,853'. 295 gpm, 2,340 psi, 40 rpm, 5k TQ. CECD -10.02 ppg, AECD - 10.46 ppg. 07:00 - 09:30 2.50 DRILL P PROD2 Attempt Madpass log from 6,853' to 6,761'. Packing off. Made several attempts. Abandon logging operations. Pull dry OK working tight spots. 09:30 - 10:30 1.00 DRILL P PROD2 POH without pumping from 6,761' to 6,577'. Work intermitent tight spots. PU - f 35k, SO - 90k. 10:30 - 12:00 1.50 DRILL P PROD2 Circulate bottoms up. 287 gpm, 2,100 psi, 60 rpm, 4k TO. CECD - 10.02 ppg, AECD - 10.24 ppg. 12:00 - 12:30 0.50 DRILL P PROD2 Service top drive and crown. 12:30 - 15:30 3.00 DRILL P PROD2 RIH from 6,577' to 11,290'. PU - 130k, SO - 87k (~ shoe). Obtain PU & SO weights every 500'. Filled pipe ~ 8,440' & 9,830'. 15:30 - 18:00 2.50 DRILL P PROD2 Wash from 11,290' to 11,423', circulate and condition mud. 300 gpm, 3,125 psi, 80 rpm, 7.8k TO. CECD -10.73 ppg, initial AECD - 11.31 ppg, final AECD -10.99 ppg 18:00 -19:30 1.50 DRILL P PROD2 Displace wail from 9.2 ppg MOBM to 9.2 ppg SFMOBM ~ 300 gpm, 3,125 psi, 80 rpm, 7.8k TQ. 19:30 -22:00 2.50 DRILL P PROD2 Monitor well - OK. POH with BHA #10 from 11,423' to 6,575'. No problems. 22:00 - 22:30 0.50 DRILL P PROD2 Drop ball, open circulating sub and pump CaCI dry job. 22:30 -00:00 1.50 DRILL P PROD2 POH from 6>575' to 4,200' to pick up whipstock retrieval assembly. 11/17/2005 00:00 - 01:00 1.00 DRILL P PROD2 POH with BHA #10 from 4,200' to 235' Printed: 12/5/2005 11:10:45 AM 'BP EXPLORATION Page 13 of 22 Operations 'Summary :Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/17/2005 01:00 -03:00 2.00 DRILL P PROD2 PJSM for nuclear source. Lay down drilling assembly BHA #10. 03:00 -04:00 1.00 DRILL P PROD2 Clean and clear rig floor of vendor tools. Function rams. 04:00 - 05:00 1.00 WHIP P RUNPRD Pick up whipstock fishing toots to rig floor. 05:00 - 06:00 1.00 WHIP P RUNPRD Make up whipstock retrieval tools BHA #11. 06:00 - 07:00 1.00 WHIP P RUNPRD RIH with BHA #11 on 4" HT-40 OP to 2,426' 07:00 - 07:30 0.50 WHIP P RUNPRD Shallow hole test MWD. 275 gpm, 830 psi. 07:30 - 08:30 1.00 WHIP P RUNPRD RIH from 2,426' to 5,037' with 8 stands of 4" HT-40 HWDP, 20 stands 4" DP 08:30 - 11:30 3.00 WHIP P RUNPRD RIH from 5,037' to 5,995' picking up (30) 4.75" drill collars 1 x 1. 11:30 - 12:00 0.50 WHIP P RUNPRD RIH on drill pipe from 5,995' to 6,603'. 12:00 - 12:30 0.50 WHIP P RUNPRD Orient retrieval lug. PU - 149k, SO 100k. Insert lug on 3rd attempt ~ 6,611'. Verify latch-up with 215k PU weight. Pulled free on second pick up. Pick up to 6,575'. 12:30 - 13:30 1.00 WHIP P RUNPRD Circulate bottoms up. 275 gpm, 1980 psi. Monitor well - OK. 9.2 ppg mud wt. 13:30 - 14:00 0.50 WHIP P RUNPRD POH slow from 6,575' to 6,048'. PU - f 50k. 14:00 - 15:00 1.00 WHIP P RUNPRD POH from 6,048' to 5,037' standing back 10 stands of 4.75" drill collars. 15:00 - 18:00 3.00 WHIP P RUNPRD POH from 5,037' to 102'. 18:00 - 19:00 1.00 WHIP P RUNPRD PJSM with Baker rep. Lay down whipstock retrieval assembly. 19:00 - 20:00 1.00 WHIP P RUNPRD Lay down whipstock, break out trip anchor assembly. 'Visual inspection of whipstock slide indicated a full 12' window. 20:00 - 20:30 0.50 WHIP P RUNPRD Clean and clear rig floor of vendor tools. Function rams. 20:30 - 21:30 1.00 CASE P RUNPRD Rig up to run 4" solid /screened liner. 21:30 -00:00 2.50 CASE P RUNPRD PJSM on liner job. Pick up 4.5' float bent shoe joint, (1) 4.5" 12.6# L-801ST-M Solid liner jt (3,000 fUfbs MU TQ) and RIH with 4" 10.9# L-80 IBT-M Solid liner alternating per running detail with 4' 15.2# L-80 IBT-M Screened liner (3,200 fUlbs MU TO) Lubricate pipe threads with Best 0 Life 2000 NM. 11/18/2005 00:00 -06:30 6.50 CASE P RUNPRD RIH with 4" 10.9# L-80 IBT-M Solid liner alternating per running detail with 4" 15.2# L-80 IBT-M Screened finer to 4,682' ~ 90 fpm. Record up & down weights every 1000' in casing. PU - 80k, SO - 65k ~ 4,682' 06:30 - 10:00 3.50 CASE P RUNPRD RIH with screened liner on 4' HT-40 drill pipe to 6,606'. PU - 106k, SO - 75k. Exit casing on 3rd attempt. 10:00 - 12:30 2.50 CASE P RUNPRD Continue RIH on 4" HT-40 drill pipe from 6,606' to 8,884' 12:30 - 13:00 0.50 CASE P RUNPRD RIH with 8 stands 4" HT-40 HWDP from 8,884' to 9,621'. 13:00 - 14:00 1.00 CASE P RUNPRD RIH with 10 stands 43/4" drill collars from 9,621' to 10,540'. 14:00 - 15:00 1.00 CASE P RUNPRD RIH on drill pipe from 10,540' to 11,271'. Worked through flight spot from 10,920' to 10,960'. PU & SO weights taken every 500' in open hole. 'Did not see any centralizers going through window. 15:00 - 15:30 0.50 CASE P RUNPRD Set down on Hook Hanger. PU - 180k, SO - 75k. Worked down hanger 5' past hook twice working out pipe compression, pick up and turn 180 deg, and set down 40k on hook. Verify hanger set 2 times. 15:30 - 16:00 0.50 CASE P RUNPRD Drop ball and pump to seat ~ 2 bpm. Pressure up to 3,000 psi for 1 minute. Pressure up to 4,230 psi, shear out. Pick up and Printed: 12/5/2005 11:10:45 AM BP EXPLORATION Page '14 of 22'' Opera#ions Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23!2005 End: 12/3/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABOBS 9ES Rig Number: Date From- To Hours Task Code NPT Phase Description of Operations 11/18/2005 15:30 - 16:00 0.50 CASE P RUNPRD verify HR tool released. PU - 150k, 50'. Ran total of: 2 jts 4.5" 12.6# L-80 BTC tubing 69' jts 4' 10.9# L-80 BTC tubing 44 jts 4" x 4.95" OD 15.2# Screened tubing w/ 9.5# L-80 BTC ends & w/ 5314" integral blade centralizers in mid joint 4 1/8" x 53/4" rigid blade centralizers on solid joints #1-69 2 centralizers each above and below Swell packers. 73 total centralizers. Tops: Shoe ~ 11,273.57 1 bent jt and 1 solid jt 4.5" 12.6# L-80 BTC ~ 11,191' 4" 10.9# L-80 BTC solid joints & 4" x 4.925` screened joints alternating 1 x 1 ~ 10,407' Solid ~ 10,285' Swell packer ~ 10,262' RA tag ~ 10,254' Solid ~ 10,083' Altemate Screened & Solid ~ 8,635' Solid ~ 8,391' Altemate Screened & Solid ~ 6,932' Solid ~ 6,689' Swell packer ~ 6,667' RA tag ~ 6,659' Top of Liner ~ 6,601' 16:00 - 17:00 1.00 CASE P RUNPRD Circulate bottoms up. 272 gpm, 1,680 psi. Stand back 1 stand. 17:00 - 17:30 0.50 CASE P RUNPRD Cut & slip 84' drilling line. 17:30 - 18:30 1.00 CASE P RUNPRD Service rig & top drive. 18:30 -00:00 5.50 CASE P RUNPRD POH with liner running tool from 6,509' to 12' 11/19/2005 00:00 -00:30 0.50 CASE P RUNPRD Break down, lay down liner running tool. 00:30 -04:00 3.50 CASE P RUNPRD PJSM. Make up Baker LEM assembly. 3,200 ft/Ibs MU TO. Rig up false table and pick up 23/8" inner string. Make up Baker ZXP packer & HR running tool 04:00 - 08:00 4.00 CASE P RUNPRD RIH with Lat i LEM assembly from 195' to 6,614'. Wash down to SBE f~ 6,717', plus 11' for LEM latch up ~ 6,601'. Verify latch up with 30k set down weight. Ran total of (1) jt 4.5" 12.6# L-80 IBT (2) 4.5" 12.6# L-80 IBT space out pups 08:00 -09:30 1.50 CASE P RUNPRD Drop and pump down ball to seat. Pressure up to 4,000 psi and set ZXP packer. Release running tool. Test packer integrity to 1500 psi - OK. Printed: 12/5/2005 11:10:45 AM `BP EXPLORATION _ Page 15 of 22 Operations Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/19/2005 08:00 -09:30 1.50 CASE P RUNPRD TOPS 4.75' ID x 6.27' OD x 19.67' Seal Bore Extension ~ 6,563.61' ZXP liner top packer w/ 5.75" ID x 6.45' OD x 11' Tie back sleeve ~ 6,544.59'. 09:30 - 10:30 1.00 CASE P RUNPRD Circulate 1 1/2 x bottoms up ~ 295 gpms, 1,740 psi. 9.2 ppg mud wt. 10:30 - 11:30 1.00 CASE P RUNPRD POH from 6,523' to 5,962'. 11:30 - 13:00 1.50 CASE P RUNPRD POH from 5,962' to 4,948' Laying down 21 4314' drill collars and racking back 3 stands DC's. 13:00 - 15:00 2.00 CASE P RUNPRD POH from 4,948' to liner running tool standing back HWDP and drill pipe. 15:00 - 15:30 0.50 CASE P RUNPRD Service break and lay down liner running tool. 15:30 - 16:00 0.50 CASE P RUNPRD Lay down 5 joints 23/8" EUE inner string. 16:00 - 17:00 1.00 CASE P RUNPRD Clear rig floor of LEM equipment. Function rams. 17:00 - 18:00 1.00 STWHIP P WEXIT Pick up whipstock tools to rig floor. 18:00 - 20:00 2.00 STWHIP P WEXIT PJSM. Make up whipstock BHA #12. Orient tools. 20:00 - 00:00 4.00 STWHIP P WEXIT RIH from 260' to 3,337' with 3 stands 4314" DC's and 4" drill pipe ~ 45 fpm per Baker rep. Shallow hole tested MWD ~ 1,460' - OK. 11/20/2005 00:00 - 01:30 1.50 STWHIP P WEXIT RIH from 3,337' to 6,500' on 4" drill pipe and 8 stands of HWDP ~ 45 fpm per Baker rep. Orient whipstock to 15 deg left. PU - 135k, SO - 85k, 348 gpm, 2,875 psi. 01:30 - 02:30 1.00 STWHIP P WEXIT Tag no go on liner top 5' deep ~ 6,550'. Set down 12k. Shear out whipstock bolt with 35k set down weight. Establish free rotation. Test backside to 1500 psi - 5 minutes - OK. "Top of window ~ 6,391' 02:30 - 03:00 0.50 STWHIP P WEXIT Displace well from 9.2 ppg SFMOBM to 9.2 ppg MOBM. 348 gpm, 2,875 psi. 03:00 -08:00 5.00 STWHIP P WEXIT Mill 7 5/8" window from 6,391 to 6,403. 343 gpm, 2520 psi, 70 rpm, 5.4k TO, PU - 135k, SO - 85k, RT - 98k, WOB - 2k. 'Top of window re'r 6,391' 'Bottom of window ~ 6,403' 08:00 -09:00 1.00 STWHIP P WEX17~ Drill 17' NB L2 new hole from 6,403' to 6,420' with same parameters. 09:00 - 12:00 3.00 STWHIP P WEXIT Circulate high viscosity sweep surface to surface while reciprocating and rotating through window ~ 345 gpm, 2535 psi, PU - 98k, SO - 85k, RPM - 80, TO - 4.3k. MW - 9.2 ppg. Monitor well, pump dry job. 12:00 - 14:00 2.00 STWHIP P WEXIT POH from 6,403' to 348'. PU - 130k, SO - 95k. 14:00 - 15:00 1.00 STWHIP P WEXIT Lay down 9 43/4' DC's and bumper sub. 15:00 - 15:30 0.50 STWHIP P WEXIT Lay down whipstock mill assembly BHA #12. 15:30 - 16:30 1.00 STWHIP P WEXIT Clean and clear rig floor of vendor tools. Function rams. 16:30 - 17:00 0.50 STWHIP P WEXIT Flush out BOP stack with jet sub. Blow down lines. 17:00 -18:30 1.50 DRILL P PROD3 Make up directional drilling assembly BHA #13. PJSM on nuclear source. Load same. RIH with flex DC's to 231'. 18:30 - 19:00 0.50 DRILL P PROD3 RIH from 231' to 1,166' with BHA #13 on 4' HT-40 drill pipe. 19:00 - 19:30 0.50 DRILL P PROD3 Shallow hole test MWD. 290 gpm, 1,460 psi. OK. 19:30 - 22:00 2.50 DRILL P PROD3 RIH from 1,166' to 6,302' with BHA #13 on 4' HT-40 drill pipe. 22:00 - 23:00 1.00 DRILL P PROD3 Circulate bottoms up X 2. 300 gpm, 2,585 psi, PU - 115k, SO - 78k. Establish base line ECD readings. CECD -10.36 ppg. Rotating AECD - 10.47 ppg ~ 60 rpm, 275 gpm, 2,210 psi. Orient bit 15 deg. right. Shut down pumps and go through Printed: 12/5/2005 11:10:45 AM BP EXPLORATION Page 1'6 of 22 Operations Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABOBS 9ES Rig Number: Date 'From - To Hours Task Code. NPT Phase Description of Operations 11/20/2005 22:00 - 23:00 1.00 DRILL P PRODS window. PU- 120k, SO - 85k. 23:00 - 00:00 1.00 DRILL P PRODS Wash down from 6,407' to 6,420'. 275 gpm, 2,210 psi. 11/21/2005 00:00 - 07:00 7.00 DRILL P PRODS Directionally drill from 6,420' to 6,774'. 269 gpm, 2,060 psi off bottom, 2,180 psi on bottom. PU - 118k, SO - 76k, WOB 5-10K. CECD - 10.39 ppg, AECD - 10.27 ppg. All sliding 07:00 -08:00 1.00 DRILL P PRODS Circulate bottoms up. 269 gpm, 2060 psi. Monitor well. MW - 9.2 PP9 08:00 - 09:00 1.00 DRILL P PRODS POH from 6,774' to 6,302'. PU - 138k, SO - 75k. 09:00 - 10:00 1.00 DRILL N RREP PRODS Replace topdrive brake caliper pins. 10:00 - 10:30 0.50 DRILL P PRODS RIH from 6,302' to 6,774'. Orient to drill. 10:30 - 18:00 7.50 DRILL P PRODS Directionally drill from 6,774' to 7,572'. 275 gpm, 2,300 psi off bottom, 2,475 psi on bottom. PU - 128k, SO - 71 k, RW - 95k, WOB 5K, RPM - 60, TQ off - 4.2k, TO on - 5.2k. CECD - 10.57 ppg, AECD - 10.86 ppg. 18:00 - 19:30 1.50 DRILL P PRODS Circulate for geology. Pump 11.2 ppg weighted high vis sweep surface to surface. 275 gpm, 2,300 psi, 60 rpm, 4k TO, PU - 105k, SO - 95k. CECD - 10.58 ppg, initial AECD - 10.57 ppg, final AECD - 10.84 ppg 19:30 - 20:30 1.00 DRILL P PRODS Directionally drill from 7,572' to 7,664'. 275 gpm, 2,300 psi off bottom, 2,475 psi on bottom. PU - 128k, SO - 71 k, RW - 95k, WOB 5K, RPM - 60, TO off - 4.2k, TQ on - 5.2k. CECD - 10.58 ppg, AECD - 10.86 ppg. 20:30 - 21:00 0.50 DRILL P PRODS Circulate for geology. 275 gpm, 2,300 psi, 60 rpm, 5k TO, PU - 100k, SO - 95k. CECD - 10.62 ppg, initial AECD - 10.69 ppg, final AECD - 10.49 ppg. Log down from 7,595' to 7,630'. 21:00 - 00:00 3.00 DRILL P PRODS Directionally drill from 7,664' to 7,850'. 275 gpm, 2,300 psi off bottom, 2,600 psi on bottom. PU - 129k, SO - 71k, RW - 100k, WOB 5-10K, RPM - 60, TO off - 5k, TO on - 6.4k. OECD - 10.50 ppg, AECD - 10.58 ppg. AST - 9.77 hrs, ART - 1.18 hrs. 11/22/2005 00:00 -04:30 4.50 DRILL P PRODS Directionally drill from 7,850' to 8,244'. 270 gpm, 2,450 psi off bottom, 2,600 psi on bottom. PU - 136k, SO - 68k, RW - 98k, WOB 5-10K, RPM - 60, TO off - 5.5k, TQ on - 7k. AST - 2.62, ART - 0.32. Calculated ECD - 10.42 ppg, Actual ECD - 11.1 PPg• 04:30 - 05:30 1.00 DRILL P PRODS Circulate for ECD's ~ 250 gpm, 2130 psi, 60 rpm, 5k TO. Following circulation, Calculated ECD - 10.6 ppg, Actual ECD - 10.7 PPg• 05:30 - 23:30 18.00 DRILL P PRODS Directionally drill from 8,244' to 10,022'. 270 gpm, 2,650 psi off bottom, 2,850 psi on bottom. PU - 145k, SO - 37k, RW - 96k, WOB 5-10K, RPM - 60, TO off - 6k, TO on - 7k. AST - 4.56, ART - 3.3. Calculated ECD - 10.8 ppg, Actual ECD -11.2 ppg. 23:30 -00:00 0.50 DRILL P PRODS Having difficulty sliding. Circulate sweep around to clean up hole. 11/23/2005 00:00 -00:30 0.50 DRILL P PRODS Having difficulty sliding. Circulate sweep around to clean up hole. No appreciable cuttings returned to surface. 00:30 - 12:00 11.50 OR11_L P PRODS Directionally drill from 10,022' to 10,954' - 275 gpm, 2,650 psi off bottom, 2,950 psi on bottom. PU - 150k, SO - 35k, RW - 96k, WOB 5-10K, RPM - 60, TO off - 7k, TO on - 8k. AST - 3.0, ART - 1.62. 12:00 -00:00 12.00 DRILL P PRODS Directionally drill from 10,954' to 12,074' - 275 gpm, 2,920 psi off bottom, 3,070 psi on bottom. PU - 165k, SO - 38k, RW - 92k, WOB 5-10K, RPM - 60, TO off - 8k, TO on - 9k. AST - 3.02, ART - 2.37. Printed: 72/5/2005 11:10:45 AM $P EXPLORATION Page 17 of 22 Operations Suilnmary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABORS 9ES Rig Number: Date from - To Hours Task Code NPT Phase Description of Operations 11/24/2005 00:00 - 07:30 7.50 DRILL P PRODS Directionally drill from 12,074' to 12,635' (TD) - 275 gpm, 2,945 psi off bottom, 3,160 psi on bottom. PU - 173k, SO - 35k, RW - 95k, WOB 5-10K, RPM - 60, TO off - 9k, TO on - 10k. AST - 1.75, ART - 1.62. 07:30 - 09:00 1.50 DRILL P PRODS Circulate sweep around - 290 gpm, 3,200 psi - 9.2 ppg fluid going in and coming out. 09:00 - 00:00 15.00 DRILL P PRODS Monitor the well -stable. Backream 1 MAD pass from 12,635' to 8,345' at 600'/hour max, 270 gpm, 2,800 psi, 60 rpm, TQ 6K. 11/25/2005 00:00 -08:30 8.50 DRILL P PRODS Continue to Backream /MAD pass from 8,345' to the window at 600'/hour max, 270 gpm, 2,800 psi, 60 rpm, TO 6K. Hole started trying to pack off at 8,260'. Reduced backreaming rate to -100'/hour and were able to backream without packing off to 8,020'. At 8,020', the backreaming rate was gradually increased back to -600'/hour without packing off. Backream out of the hole to 6,500'. Shut down the pumps and rotary and pull pipe dry across the window and into the casing from 6,500' to 6,302'. 08:30 - 09:30 1.00 DRILL P PRODS Circulate 1.5 x bottoms up - 300 gpm, 2,225 psi, 60 rpm, TO - 5k. Calculated ECD - 10.08 ppg, Initial Actual ECD - 10.38 ppg, Final Actual ECD - 10.28 ppg 09:30 - 11:30 2.00 DRILL P PRODS Cut and slip 85' of drilling line. Clean under the drawworks and service the top drive. 11:30 - 13:30 2.00 DRILL P PRODS PJSM. MU Halliburton RTTS/Storm Packer. RIH 30' and apply 1!4 tum to the right. Slack off 50k. Apply 22 turns to the left and unsting from the packer. LD single and pressure test above the packer to 1,000psi -good. 13:30 - 14:30 1.00 BOPSU P PRODS Change out the air boots on the riser, pull wear ring, and clean the floor. 14:30 - 18:00 3.50 BOPSU P PRODS RU and test the BOPE and all related equipment. Test the BOPE to 250 psi ! 3,500 psi - no failures. Witness of the test was performed by Tom Angien (BP), Kelly Cozby (NAD), and was waived by Jeff Jones of the AOGCC. RD testing equipment, blowdown all surface lines and install wear ring. 18:00 - 19:00 1.00 DRILL P PRODS PU single joint of 4" DP. RIH to the top of the RTTS/Storm Packer. Apply 6 turns to the right and screw into the packer. MU the top drive and apply 21 turns to the right to release the packer. Pull packer to the rig floor. LD RTTS/Storm Packer. 19:00 - 20:00 1.00 DRILL P PRODS Orient the bit to high side and RIH from 6,302' to 6,372' -taking weight. Circulate bottoms up -300 gpm, 2,050 psi, 40 rpm. 20:00 -00:00 4.00 DRILL P PRODS With the bit oriented high side, RIH through the window without problems. Continue to RIH with 4" DP and 8 stands of 4" HWDP from the derrick to 7,879'. PU 24 more joints of 4" HWDP and continua to RIH with 4' DP from the derrick to 11,833' -started to take weight at 10,000', but still able to work pipe down. 11/26/2005 00:00 -00:30 0.50 DRILL P PRODS Continue to RIH with 4" DP from the derrick from 11,833' to 12,635' taking intermittent weight, but able to work pipe down. 00:30 -03:30 3.00 DRILL P PRODS Circulate and condition the hole - 280 gpm, 3,100 psi. Calcuated ECD - 10.8, Actual ECD - 11.1 03:30 - 05:30 2.00 DRILL P PRODS Displace the well over to 9.2 ppg solids free MOBM - 280 gpm, 3,100 psi. 05:30 - 09:30 4.00 DRILL P PRODS Monitor the well -stable. MW in - 9.2 ppg, MW out - 9.2 ppg. POH standing back 4" DP and 4' HWDP from 12,635' to Printed: 1?J5/2005 11: Y 0:45 AM -BP EXPLORATION Page 18 of 22 -Operations Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABORS ALASKA DRILLING 1 Rig Release: 12/3/2005 Rig Name: NABORS 9ES Rig Number: '.Date f=rom - To Hours Task Code NPT Phase Description of Operations 11/26/2005 05:30 - 09:30 4.00 DRILL P PROD3 6,361'. 09:30 - 10:30 1.00 DRILL P PROD3 Drop ball and open the circ sub -observe shear at 2,400 psi. Circulate bottoms up with 400 gpm, 2,230 psi. Monitor the well -stable. Pump dry job. 10:30 - 12:00 1.50 DRILL P PROD3 POH standing back 4" DP from 6,361' to 5,561'. 12:00 - 15:00 3.00 DRILL P PROD3 LD 4' DP from 5,561' to the top of the jars at 233'. 15:00 - 18:00 3.00 DRILL P PROD3 PJSM for LD BHA and handling nuclear source. LD 6-3/4" BHA#13 from 233' -jars, 1 x 4" DP, xo, circ sub, 2 x nm flex dc, ADN, VPWD, MWD/LWD, nm stab, AIM motor and 6-3/4' bit. 6-3/4' Hycalog RR DS146 graded: 4/3/BT/A/X/2/CTlrD. 18:00 - 19:00 1.00 DRILL P PROD3 Clear and clean rig floor. 19:00 - 21:00 2.00 WHIP P RUNPRD PJSM. Bring Baker whipstock retrieval tools to the rig floor. MU Whipstock retrieval BHA to 99' -fixed lug retrieval hook, 1 x 3-1/2' HWDP, float sub, MWD, bumper sub, jars, xo. 21:00 - 23:30 2.50 WHIP P RUNPRD RIH with Whipstock retrieval BHA on 31 stands of 4" DP and 16 stands of 4" HWDP to 4,446'. 23:30 -00:00 0.50 WHIP P RUNPRD PU 10 x 4-3/4" DC's and RIH to 4,750'. 11/27/2005 00:00 -00:45 0.75 WHIP P RUNPRD PU remaining 20 x 4-3/4" DC's and RIH to 5,367'. 00:45 - 01:15 0.50 WHIP P RUNPRD RIH with 4" DP from the derrick to 6,330. 01:15 - 01:30 0.25 WHIP P RUNPRD Orient the retrieval hook to be 180 degrees out from the retrieval slot - 01:30 - 02:00 0.50 WHIP P RUNPRD RIH with 4" DP. PU single joint of 4' DP. Screw in with the top drive and wash down over the slide to ensure slot clean for retrieval. 02:00 - 02:15 0.25 WHIP P RUNPRD Orient the retrieval hook to the retrieval slot. 02:15 - 02:30 0.25 WHIP P RUNPRD Engage the whipstock and pull free with -70k overpull. 02:30 - 03:15 0.75 WHIP P RUNPRD LD single and POH standing back 4" DP to 5,865'. 03:15 - 06:00 2.75 WHIP P RUNPRD At 5,865', there was an increase in the amount of drag seen while pulling out of the hole -max overpull of 100k. Screw in with the top drive to verify orientation of the BHA. Cock the jars and then PU to 100k overpuN to fire the jars. Repeat process making minor gains to 5,853'. 06:00 - 13:00 7.00 WHIP P RUNPRD Whipstock pulled free at 5,853'. Saw -30K to 50K drag white " pulling out of the hole slowly, standing back 4" DP, HWDP and 4-3/4" collars to 4,630'. Saw expected drag from 4,630' to the top of the retrieval BHA at 99'. 13:00 - 14:30 1.50 WHIP P RUNPRD LD retrieval BHA and whipstock assembly. Recovered all whipstock assembly: slide, ported sub, debris sub, unloader valve, shear sub, retrievable BTA, double pin sub, blank sub, 3 jts 3-1/2' HWDP, 4 DP pups, unloader valve, locator sub and seals. Significant damage to the debris sub on the whipstock BHA. 14:30 - 15:30 1.00 WHIP P RUNPRD Remove all tools from the rig floor. Clean rig floor. 15:30 -16:00 0.50 CONDH P RUNPRD Service the top drive and crown. 16:00 - 17:30 1.50 CONDH P RUNPRD PJSM. Bring Baker junk baskets, boot baskets and tools to the rig floor. MU and RIH with baker Junk Basket BHA -junk basket, reverse junk basket, xo, boot basket, boot basket, xo, locator bumper sub, jars. 17:30 - 19:30 2.00 CONDH P RUNPRD PU 30 jts of 4-3/4" Drill Collars from the pipe shed and RIH to 963'. 19:30 - 23:00 3.50 CONDH P RUNPRD RIH with 4" HWDP and 4" DP from the derrick. Wash down from 6,326' and tag the top of the L1 liner at 6,544' - 290 gpm, 2,500 psi. Printed: 12/5/2005 11:10:45 AM BP"EXPLORATION ', Page ~9 of 22 Operations Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/27/2005 23:00 -00:00 1.00 CONDH P RUNPRD Circulate bottoms up and condition the mud - 290 gpm, 2,500 psi. Pump dry job. 11/28/2005 00:00 - 03:45 3.75 CONDH P RUNPRD POH from 6,544' to the top of the Junk Basket BHA at 39'. Hole trying to swab. POH with reduced pulling speed to manage swab tendency. 03:45 - 05:30 1.75 CONDH P RUNPRD LD Junk Basket BHA. Recovered -1" diameter x 0.25" thick flat rock and brass lug from whipstock. Clear and clean the floor. 05:30 - 07:00 1.50 CASE P RUNPRD RU liner running handling tools and prepare to run L2 4' screen/solid liner. 07:00 - 07:30 0.50 CASE P RUNPRD Hold PJSM for running liner. 07:30 - 16:30 9.00 CASE P RUNPRD PU and RIH with 4" liner per tally on Baker running tool to 5,884'. Liner shoe track consists of 4.5" float shoe, 4.5" 12.6# L-80 IBT-m bent joint, 4.5" 12.6# L-80 IBT-m full joint and xo. The remaining liner consists of 4" L-80 9.5# IBT-m solid joints, 4' 10.9# L-80 IBT-m solid joints, 4" L-80 15.2# IBT-m screens, 3 "Swell" packers, casing swivel assembly and hook hanger assembly. Utilized BOL 2000 NM thread lubricant and torqued to 3,200 ftlbs. Ran 1 straight blade centralizer on each solid joint. 16:30 - 17:00 0.50 CASE P RUNPRD RD casing handling equipment and clear the floor. 17:00 - 18:00 1.00 CASE P RUNPRD RIH with 4" DP from the derrick to the window. Work pipe through the window on the first try - PU - 95k, SO - 64k. 18:00 -00:00 6.00 CASE P RUNPRD RIH with remaining 4" DP from the derrick (total of 31 stands). RIH with 4' HWDP from the derrick (total of 16 stands) to 10,232'. Worked pipe with slight rotation (<2,800 ftlbs torque) over tight spots at 7,145', 9,050', 9,500' in short amount of time. Set down hard at 10,130' and saw overpull of -30k while working pipe after -37' of travel. While speaking to engineer in town about options, we were able to work past the tight spot at 10,130' after -2 hours of working pipe. 11/29/2005 00:00 - 01:00 1.00 CASE P RUNPRD Continue to RIH with 4" solid/screen liner. RIH with 2 stands of 4-314" Drill Collars and tag up at 10,362'. Unable to get past without rotation and cannot rotate the DC's. POH and stand back DC's and RIH with 4" DP. 01:00 - 02:30 1.50 CASE P RUNPRD RIH with 4" DP. Work past tight spot at 10,362' with rotation and work pipe down to 10,442'. Unable to get past 10,442'. PU and stand back a stand of DP. POH with next stand to position liner shoe above previous tight spot at 10,362'. Set down at 10,362'. Confirmed that the tight spots at 7,145', 9,500', 10,130', 10,362' and 10,442' closely match when the top collar of a solid joint with a floating centralizer was at the bottom of the window. Confer with engineer in town. Decision made to POH with the liner and remove the centralizers from the solid jonts down to 4' i0.9# L-80 IBT-m joint #14 per liner tally -the joint that was across the window at shoe depth of 10,130'. 02:30 - 07:00 4.50 CASE N DPRB RUNPRD Pump solids free dry job and POH standing back 4" DP and 4" HWDP to the top of the liner at 5,884' 07:00 - 08:00 1.00 CASE N DPRB RUNPRD RU casing handling tools. 08:00 - 12:00 4.00 CASE N DPRB RUNPRD POH and LD hook assembly, swivel assembly, swell packer assembly, 41 joints of 4' 10.9# L-80 IBT-M solid liner and swell packer assembly. LD 4" 10.9# L-80 IBT-M solid / 4" 15.2# L-80 Printed: 12/5/2005 11:10:45 AM BP EXPLORATION `PagezO ofi 22 Operations Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/29/2005 08:00 - 12:00 4.00 CASE N DPRB RUNPRD IBT-M screen liner to 3,370'. Remove all centralizers from the solid liner joints. Found 2 joints, #17 and #18 of the 10.9# liner) with a centralizer crimped onto each of the joints - replaced both of the joints in the liner string. 12:00 - 14:30 2.50 CASE N DPRB RUNPRD PU and RIH with 4" liner per tally - no centralizers on solid joints from 10.9# #10 joint. Utilized BOL 2000NM thread lubricant and torqued to 3,200 tt-Ibs. 14:30 - 15:00 0.50 CASE N DPRB RUNPRD RD casing handling equipment. 15:00 - 15:30 0.50 CASE N DPRB RUNPRD RIH with liner on 4° DP through the window on the first attempt to 6,550'. 15:30 - 20:00 4.50 CASE N DPRB RUNPRD Continue to RIH with 4° solid/screen liner on 4" DP, 4" HWDP, and 4-3/4" DC's to 10,442'. Worked pipe across tight spots at 6,760', 8,914' and 9,739'. 20:00 -00:00 4.00 CASE P DPRB RUNPRD Continue to RIH with liner from 10,442' to 11,872'. Worked through tight spots at 10,517' and 11,872'. 11/30/2005 00:00 - 03:00 3.00 CASE P RUNPRD Work pipe down from 11,872' to 12,265'. Weight was lost at -11,872'. RIH 9' past casing landing depth to ensure hook hanger went past and wipe the interval numerous times from 12,230' to 12,260'. to reduce the drag to aid in the identification of when the hanger would be landed. 03:00 -06:00 3.00 CASE P RUNPRD PU to 12,230'. Slack off and rotate 1/4 tum. Work pipe down to 12,260' and set down -hook hanger on depth. PU to 12,230'. Slack off and rotate 1/4 tum. Work pipe down and set down at 12,260'. POH to 12,230'. Slack off and rotate 1/4 tum. Work pipe down and set down at 12,263'. PU to 12,230'. Slack off and rotate 1!4 tum. Work pipe down and set down at 12,263'. PU to 12,230'. Slack off and rotate 1/4 turn. Work pipe down and set down at 12,260' -believe hook hanger to be on depth, but due to tack of weight and having to work the pipe down it is difficult to tell. PU to 12,230' to re-verify. Slack off and rotate 1/2 tum. Work pipe down and set down at 12,255' - unexplained result. PU to 12,230' to re-verify. Slack off and rotate 1/2 tum. Work pipe down and set down at 12,260'. PU " to 12,230'. Slack off and rotate 1/2 tum. Work pipe down and set down at 12,263'. PU to 12,230'. Slack off and rotate 112 turn. Work pipe down and set down at 12,260' -hook hanger in place. Prepare to release running tool. 06:00 - 06:30 0.50 CASE P RUNPRD Drop ball and pump onto seat. Pressure up to 3,500 psi and release from the liner. PU out of the liner top and pressure up to 4,200 psi to shear out the ball seat. 06:30 - 08:00 1.50 CASE P RUNPRD Circulate a bottoms up. Pump dry job and prepare to trip out of the hole. MW in - 9.2 ppg, MW out - 9.2 ppg. 08:00 - 08:15 0.25 CASE P RUNPRD POH standing back 2 stands of 4" DP to 6,215'. 08:15 - 1 f:30 3.25 CASE P RUNPRD LD 60 joints of 4-3/4' drill collars from 6,215' to 4,371'. 11:30 - 13:00 1.50 CASE P RUNPRD POH standing back 16 stands of 4" HWDP and 3i stands of 4" DP to the top of the running tool. 13:00 -13:30 0.50 CASE P RUNPRD Make service breaks and LD Baker HR running toot. 13:30 - 14:30 1.00 TIEBAC P OTHCMP RU the rig floor to run LEM #2. Bring tools and materials to the floor. 14:30 - 17:30 3.00 TIEBAC P OTHCMP PJSM. MU Baker non-locating seal assembly with 4.5" L-80 full XO joint from STL pin to IBT-m box, 2 joints of 4.5' 12.6# L-80 IBT-M liner, 3 x 4.5" pup joints and LEM hanger assembly. RU false rotary table and MU 2-3/8' 8rd EUE inner string. MU Printed: 12/5/2005 11:10:45 AM 'BP 'EXPLORATION Page 21 of 22 Operations Summary Report Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABOBS 9ES Rig Number: Date ''From - To Hours Task Code NPT Phase Description of Operations 1 i/30/2005 14:30 - 17:30 3.00 TIEBAC P OTHCMP baker HR running tool/ZXP packer assembly down to 237' 17:30 - 18:30 1.00 TIEBAC P OTHCMP Slip and cut drilling line. Service the top drive and the crown. 18:30 -00:00 5.50 TIEBAC P OTHCMP RIH with LEM #2 on 4' HWDP and 4" DP to 6,376', PU - 140K, SO - 75K. Tag the top of the L2 hook on depth at 6,386'. Rotate the string 1/2 turn. RIH to 6,540'. Screw in with the top drive and circulate down and enter the seal assebly. Latch into the hook hanger with the LEM on depth and verify with 30k down and 10k up. Drop ball and pump down onto seat. Pressure up to 4,200 psi to set the packer and release from the LEM. PU to expose dogs. Slack back off and verify release from LEM. PU 30' and get ready to displace over to 9.1 ppg brine. Bottom of Non-locating seal assembly - 6,574', Top of LEM #2 - 6,375', Top of ZXP liner top packer - 6,349' (11' tieback extension). 12!1/2005 00:00 - 02:00 2.00 TIEBAC P OTHCMP Displace the well over to 9.2 brine. 02:00 - 03:30 1.50 TIEBAC P OTHCMP Clean possum belly, shakers, trough and trip tank of MOBM. 03:30 - 10:30 7.00 TIEBAC P OTHCMP POH LD 4" DP and 4" HWDP. LD packer setting tool and 2-3/8" inner string. RIH with 9 stands of 4" from the derrick. LD 27 joints of 4" DP. 10:30 - 11:30 1.00 TIEBAC P OTHCMP Flush the BOP stack and pull the wear ring. 11:30 - 13:00 1.50 BUNCO RUNCMP Bring tubing handling equipment to the rig floor. RU tools to run 4.5" 12.6# L-80 TCII completion. Make a dummy run with the landing joint and the tubing hanger and mark pipe. 13:00 - 20:00 7.00 BUNCO RUNCMP PJSM. PU and RIH with 4.5" 12.6# L-80 TCII completion per tally to 2,491 - 4.5" 12.6# L-80 IBT-M guide shoe, TCII box x IBT-M pin xo, 4.5" TCII X nipple assembty(3.813" ID), 4.5" TCII X nipple assembly w/ RHC-M plug profile (3.813" ID), 1 jt 4.5" 12.6# TCII tubing, 7.625" x 4.5" Premier Packer assembly, Phoenix Jet Pump Sensor assembly, Baker CMD sliding sleeve / Phoenix Discharge Pressure Sensor assembly. RU I-wire and tie in. Check conductivity -good. Continue to RIH with completion - 2 jts of 4.5" TCII tubing, GLM #i assembly with DCK shear valve, 2 jts 4.5" TCII tubing, GLM ff2 assembly, 27 jts 4.5" TCII tubing, 23 jts of 4.5" TCII tubing to 2,490'. All tubing connections utilized Jet Lube Seal Guard thread lubricant and Torque Turned to 3,850 ft-Ibs. 20:00 - 22:00 2.00 BUNCO RREP RUNCMP Splash plate on the high drum clutch broke. Re-weld into position. 22:00 - 00:00 2.00 BUNCO RUNCMP Continue to RIH with 4.5" completion. RIH with 18 jts of 4.5" TCII tubing to 3,192'. 12/2/2005 00:00 - 06:45 6.75 BUNCO RUNCMP Continue to RIH with 4.5' 12.6# L-80 TCII completion from 3,192' to 6,365' #o space out W LEG into Tieback. Lay down excess pipe and P/U proper space out pups below last full joint of tubing. P/U and M/U tubing hanger and install 12 ea. blast rings around pup joint below hanger body. Place 1 stop ring below blast rings once they were positioned onto pup, so as to prevent fluid erosion from incoming annulus fluids. RU I-wire through the tubing hanger. Land the tubing on the hanger. Tubing tail located at 6,356'. 06:45 - 07:30 0.75 BUNCO RUNCMP RD the rig floor and clear of all vendor tools. 07:30 -09:00 1.50 BUNCO RUNCMP RU to reverse circulate the well. Reverse circulate 5 bbls of Printed: 12/5/2005 11:10:45 AM BP EXPLORATION 'Page 22 of 22 Operations Summary Reporf Legal Well Name: L-250 Common Well Name: L-250 Spud Date: 10/24/2005 Event Name: DRILL+COMPLETE Start: 10/23/2005 End: 12/3/2005 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2005 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task' Code NPT Phase Description-of Operations 12/2/2005 07:30 - 09:00 1.50 BUNCO RUNCMP 9.2 corrosion inhibited brine chased with 160 bbls of clean brine -spotting the CI brine between the lower GLM and the packer - 3 bpm, 210 psi. 09:00 - 12:00 3.00 BUNCO RUNCMP Drop 1-7/8" ball and roller rod assmbly and allow to seat. Pressure up the inside of the tubing to 4,200 psi to set the Premier packer and then reduce the pressure to 3,500 psi - charf and hold for 30 minutes -good. Bleed the tubing pressure to 2,500 psi and then pressure up on the annulus to 3,500 psi -chart and hold for 30 minutes -good. Bleed off the annulus pressure and then the tubing pressure. Re-pressure up on the annulus and observe the DCK-2 shear at 2,350 psi. Install TWC with T-bar and test from below to 1,000 psi -good. Witness of the tubing and annulus pressure test was done by John Crisp of the AOGCC. 12:00 - 17:00 5.00 BUNCO RUNCMP Blow down all the surface lines and clean the rig of the MOBM. LD tools from the rig floor and pressure was the rig floor to remove MOBM. 17:00 - 21:00 4.00 BOPSU P RUNCMP Remove the top rams, blind rams and the bottom rams from the BOPE. ND ROPE, riser and set back in the cellar. 21:00 -00:00 3.00 BOPSU P RUNCMP NU the adapter flange and tie in with the I-wire. Test Adapter to 5,000 psi -good. Surface conductivity test of the I-wire was good. 12/3/2005 00:00 - 03:30 3.50 WHSUR P RUNCMP Continue to NU the tree. Test to 5,000 psi -good. Pull TWC with lubricator. 03:30 - 05:30 2.00 BUNCO RUNCMP RU circulation lines and reverse circulate 90 bbls of corrosion inhibited brine. Blow down all surface lines. 05:30 - 08:30 3.00 BUNCO RUNCMP RU LRHOS. Freeze protect the well with 110 bbls of diesel pumped by LRHOS. Allow to u-tube in place."" While finishing up with the freeze protection app. 1/2 gal. of diesel was released from a hose and leaked onto the rig floor. It was reported to Bill ~ 5700.**" 08:30 - 10:30 2.00 WHSUR P RUNCMP Install BPV with Lubricator and test from below to 1,000 psi - good. Install VR plugs in both tubing spool outlets. Rig released to Maintenance ~ 1030 hours. Printed: 12/5/2005 11:10:45 AM ~ ~, {, ~ c ;~~'• L-250L2 Survey Report Report Date: 26-Nov-05 Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure /Slot: L-PAD / L-250 (NM-15 ) Well: L-250 Borehole: L-250L2 UWVAPI#: 500292328161 Survey Name /Date: L-250L2 /November 26, 2005 Torf I AHD / DDI / ERD ratio: 548.000° / 10472.05 ft / 7.220 / 2.395 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LaVLong: N 70 21 2.318, W 14919 28.397 Location Grid NIE YIX: N 5978285.200 fiUS, E 583192.780 fiUS Grid Convergence Angle: +0.63611620° Comments Measured Inclination Azimuth SulrSea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Sectlon Departure ft de de ft ft ft ft ft ft ft de /100 ft ftUS ttUS Vertical Section Azimuth: 106.970° Vertical Section Origin: N 0.000 ft, E 0.000 ft TVD Reference Datum: Roiary Table TVD Reference Elevation: 77.30 ft relative to MSL Sea Bed /Ground Level Elevation: 48.80 k relative to MSL Magnetic Declination: 24.410° Total Field Strength: 57577.493 nT Magnetic Dip: 80.849° Declination Date: November 22, 2005 Magnetic Declination Model: BGGM 2005 North Reference: True North Total Corr Mag North -> True North: +24.410° Local Coordinates Referenced To: Well Head Hl E U.UU U.UU U.UU First GYD GC SS 100.00 0.18 72.13 200.00 0.28 91.26 300.00 0.33 67.69 400.00 0.48 65.03 500.00 600.00 700.00 800.00 900.00 Tie-In Survey First MWD_IFR_MS 1000.00 1100.00 1142.48 1238.55 1333.71 1426.70 1521.00 1615.30 1709.51 1803.55 1897.74 1992.59 2087.57 0.38 4.63 7.22 9.47 10.55 12.85 18.01 17.42 23.54 28.06 33.77 39.49 41.59 43.47 48.15 50.17 50.39 50.71 60.50 0.90 2.14 358.78 0.97 1.98 1.78 2.28 359.82 359.38 1.48 3.27 2.81 4.55 5.70 6.38 5.96 5.82 -//.3U 22.70 122.70 222.70 322.70 422.69 522.58 622.04 720.97 819.45 917.36 1013.73 1054.19 1144.15 1229.80 1309.55 1385.20 1456.86 1526.28 1591.81 1653.41 1714.02 1774.37 U.UU U.UU U.UU U.UU U.UU U.UU 100.00 0.13 0.16 0.16 0.05 0.15 200.00 0.49 0.55 0.55 0.09 0.54 300.00 0.95 1.08 1.07 0.19 1.05 400.00 1.49 1.79 1.77 0.48 1.70 499.99 2.03 2.54 2.51 0.82 2.37 599.88 1.14 6.78 5.71 5.02 2.72 699.34 -1.59 17.10 15.63 15.34 3.02 798.27 -5.77 31.61 30.00 29.85 3.08 896.75 -10.86 48.99 47.32 47.22 3.06 994.66 -16.26 69.27 67.59 67.49 3.60 2.31 5978352.72 583195.63 1091.03 -23.19 95.86 94.18 94.08 4.46 5.16 5978379.31 583196.20 1131.49 -26.52 108.79 107.11 106.99 4.92 1.43 5978392.23 583196.51 1221.45 -35.84 142.38 140.69 140.58 5.43 6.43 5978425.82 583196.65 1307.10 -48.21 183.79 182.06 181.98 5.13 4.75 5978467.21 583195.89 1386.85 -61.73 231.54 229.80 229.73 5.56 6.25 5978514.96 583195.79 1462.50 -75.85 287.78 286.03 285.92 7.95 6.17 5978571.16 583197.55 1534.16 -90.61 349.06 347.30 347.12 11.20 2.25 5978632.39 583200.12 1603.58 -105.23 412.74 410.95 410.66 15.30 2.35 5978695.97 583203.52 1669.11 -119.04 480.15 478.28 477.80 21.35 5.05 5978763.16 583208.82 1730.71 -132.54 551.41 549.41 548.66 28.85 2.21 5978834.09 583215.54 1791.32 -146.21 624.36 622.27 621.19 36.69 0.41 5978906.70 583222.57 1851.67 -160.31 697.70 695.55 694.14 44.22 0.36 5978979.73 583229.29 U.UU 5y/tlLt55.LU 5tfJ1yL./iS N /U L1 L.JltS VV l4y ly LtS.Jy/ 0.18 5978285.25 583192.93 N 70 21 2.318 W 149 19 28.393 0.12 5978285.30 583193.32 N 70 21 2.319 W 149 19 28.381 0.13 5978285.41 583193.83 N 70 21 2.320 W 149 19 28.366 0.15 5978285.70 583194.47 N 70 21 2.323 W 149 19 28.347 0.11 5978286.05 583195.14 4.45 5978290.25 583195.44 2.59 5978300.57 583195.63 2.30 5978315.07 583195.53 1.14 5978332.45 583195.31 N 70 21 2.326 W 149 19 28.328 N 70 21 2.367 W 149 19 28.317 N 70 21 2.469 W 149 19 28.309 N 70 21 2.611 W 149 19 28.307 N 70 21 2.782 W 149 19 28.308 N 70 21 2.982 W 149 19 N 70 21 3.243 W 149 19 N 70 21 3.370 W 149 19 28. 3 N 70 21 3.700 W 149 19 28.238 N 70 21 4.108 W 149 19 28.247 N 70 21 4.577 W 149 19 28.234 N 70 21 5.130 W 149 19 28.165 N 70 21 5.732 W 149 19 28.070 N 70 21 6.357 W 149 19 27.950 N 70 21 7.017 W 149 19 27.773 N 70 21 7.714 W 149 19 27.554 N 70 21 8.427 W 149 19 27.324 N 70 21 9.145 W 149 19 27.105 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-250 (NM-15)\L-250\L-250L2\L-250L2 Generated 11/28/2005 3:26 PM Page 1 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft tt it ft ft ft tt de 1100 ft ftUS ftUS Y~I t5Y.43 ~U./Z b.U3 -Itl34.43 -lyll./J --I/4.J/ //1.13 /OO.aG /Ui.lr ai.oV U.Ir aa~yUOG.oo Uoocoo.vo rv rUGi a.wa vv iYa is c~.ooo 2278.30 50.98 6.67 1894.96 1972.26 -188.07 845.47 843.20 841.06 60.02 0.58 5979126.80 583243.46 N 70 21 10.590 W 149 19 26.643 2371.54 50.42 6.76 1954.02 2031.32 -200.92 917.63 915.29 912.72 68.46 0.61 5979198.54 583251.10 N 70 21 11.294 W 149 19 26.396 2466.47 50.95 6.67 2014.16 2091.46 -214.00 991.07 988.67 985.66 77.05 0.56 5979271.56 583258.87 N 70 21 12.012 W 149 19 26.145 2561.66 51.25 6.75 2073.94 2151.24 -227.19 1065.15 1062.70 1059.24 85.70 0.32 5979345.22 583266.71 N 70 21 12.735 W 149 19 25.892 2655.99 50.76 6.72 2133.30 2210.60 -240.22 1138.46 1135.96 1132.04 94.30 0.52 5979418.11 583274.50 N 70 21 13.451 W 149 19 25.641 2750.38 51.58 6.48 2192.48 2269.78 -253.45 1211.99 1209.46 1205.09 102.75 0.89 5979491.24 583282.14 N 70 21 14.170 W 149 19 25.394 2842.88 54.02 5.92 2248.40 2325.70 -267.23 1285.67 1283.11 1278.33 110.70 2.68 5979564.56 583289.27 N 70 21 14.890 W 149 19 25.161 2938.01 54.48 5.76 2303.98 .2381.28 -282.13 1362.87 1360.31 1355.13 118.56 0.50 5979641.44 583296.27 N 70 21 15.645 W 149 19 24.931 3030.50 54.05 5.73 2358.00 2435.30 -296.74 1437.95 1435.38 1429.83 126.07 0.47 5979716.21 583302.96 N 70 21 16.380 W 149 19 24.712 3124.67 53.78 5.75 2413.46 2490.76 -311.57 1514.05 1511.48 1505.55 133.68 0.29 5979792.00 583309.73 N 70 21 17.125 W 149 19 3217.96 53.69 5.83 2468.65 2545.95 -326.15 1589.27 1586.69 1580.39 141.27 0.12 5979866.91 583316.49 N 70 21 17.861 W 149 19 3304.80 54.42 5.76 2519.62 2596.92 -339.78 1659.57 1656.99 1650.33 148.37 0.84 5979936.92 583322.81 N 70 21 18.549 W 149 19 24.060 3377.66 54.50 7.88 2561.98- 2639.28 -350.22 1718.86 1716.25 1709.19 155.41 2.37 5979995.85 583329.19 N 70 21 19.127 W 149 19 23.854 3460.47 55.12 11.54 2609.71 2687.01 -358.76 1786.53 1783.70 1775.88 166.83 3.69 5980062.66 583339.67 N 70 21 19.783 W 149 19 23.520 3553.53 54.96 16.27 2663.05 2740.35 -362.84 1862.78 1859.12 1849.88 185.15 4.17 5980136.85 583357.36 N 70 21 20.511 W 149 19 22.985 3646.38 54.07 21.14 2716.97 2794.27 -360.57 1938.37 1932.83 1921.46 209.36 4.38 5980208.68 583380.78 N 70 21 21.215 W 149 19 22.277 3739.41 53.06 24.30 2772.23 2849.53 -353.09 2013.21 2004.69 1990.49 238.25 2.94 5980278.02 583408.90 N 70 21 21.894 W 149 19 21.432 3833.63 53.64 25.65 2828.48 2905.78 -342.56 2088.80 2076.66 2059.01 270.17 1.30 5980346.88 583440.05 N 70 21 22.568 W 149 19 20.499 3926.05 51.52 27.14 2884.63 2961.93 -330.55 2162.19 2146.22 2124.75 302.78 2.63 5980412.98 583471.93 N 70 21 23.214 W 149 19 19.546 4019.45 51.26 27.27 2942.92 3020.22 -317.59 2235.18 2215.32 2189.66 336.15 0.30 5980478.25 583504.57 N 70 21 23.853 W 149 19 18.570 4112.37 51.19 26.85 3001.11 3078.41 -304.89 2307.62 2284.19 2254.17 369.11 0.36 5980543.12 583536.80 N 70 21 24.487 W 149 19 17.607 4204.46 51.42 26.73 3058.68 3135.98 -292.64 2379.49 2352.84 2318.33 401.50 0.27 5980607.63 583568.48 N 70 21 25.118 W 149 19 16.659 4297.65 51.71 29.80 3116.62 3193.92 -278.34 2452.48 2422.19 2382.61 436.06 2.60 5980672.28 583602.33 N 70 21 25.750 W 149 19 15.649 4392.61 51.45 30.78 3175.63 3252.93 -261.20 2526.88 2492.26 2446.85 473.59 0.85 5980736.93 583639.13 N 70 21 26.382 W 149 19 14.552 4485.21 53.60 29.48 3231.97 3309.27 -244.48 2600.36 2561.79 2510.41 510.46 2.58 5980800.89 583675.30 N 70 21 27.007 W 149 19 13.474 4578.62 54.11 29.11 3287.06 3364.36 -228.38 2675.79 2633.71 2576.20 547.37 0.63 5980867.07 583711.47 N 70 21 27.654 W 149 19 12.394 4671.65 53.80 29.11 3341.80. 3419.10 -212.56 2751.01 2705.69 2641.92 583.96 0.33 5980933.19 583747.33 N 70 21 28.300 W 149 19 1 4764.31 53.21 29.31 3396.91 3474.21 -196.77 2825.50 2777.10 2706.93 620.32 0.66 5980998.60 583782.95 N 70 21 28.940 W 149 19 4857.56 52.79 29.02 3453.03 3530.33 -181.04 2899.98 2848.67 2771.96 656.61 0.51 5981064.02 583818.51 N 70 21 29.579 W 149 19 4952.03 52.51 29.57 3510.35 3587.65 -165.01 2975.07 2920.94 2837.46 693.35 0.55 5981129.91 583854.53 N 70 21 30.223 W 149 19 8.126 5045.33 51.88 29.69 3567.54 3644.84 -148.85 3048.79 2991.91 2901.54 729.80 0.68 5981194.39 583890.26 N 70 21 30.854 W 149 19 7.060 5138.73 54.44 29.12 3623.53 3700.83 -132.76 3123.53 3064.07 2966.65 766.49 2.78 5981259.90 583926.22 N 70 21 31.494 W 149 19 5.987 5230.90 54.90 28.89 3676.83 3754.13 -117.09 3198.73 3136.92 3032.42 802.95 0.54 5981326.06 583961.94 N 70 21 32.141 W 149 19 4.921 5324.74 54.48 28.53 3731.07 3808.37 -101.50 3275.31 3211.32 3099.58 839.74 0.55 5981393.62 583997.98 N 70 21 32.801 W 149 19 3.845 5417.84 53.82 28.79 3785.60 3862.90 -86.21 3350.77 3284.74 3165.80 875.93 0.74 5981460.23 584033.43 N 70 21 33.452 W 149 19 2.787 5511.05 55.75 28.85 .3839.35 3916.65 -70.58 3426.92 3358.87 3232.51 912.64 2.07 5981527.34 584069.39 N 70 21 34.109 W 149 19 1.714 5603.61 57.96 28.05 3889.95 3967.25 -55.16 3504.41 3434.52 3300.65 949.55 2.49 5981595.88 584105.54 N 70 21 34.779 W 149 19 0.634 5697.17 60.88 28.88 3937.54 4014.84 -39.10 3584.95 3513.22 3371.45 987.94 3.21 5981667.09 584143.14 N 70 21 35.475 W 149 18 59.511 5791.86 63.76 30.59 3981.53 4058.83 -20.56 3668.79 3594.82 3444.24 1029.54 3.44 5981740.33 584183.93 N 70 21 36.191 W 149 18 58.295 5884.27 66.66 32.01 4020.27 4097.57 0.21 3752.68 3676.03 3515.91 1073.13 3.43 5981812.47 584226.71 N 70 21 36.895 W 149 18 57.020 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-250 (NM-15)\L-250\L-250L2\L-250L2 Generated 11/28/2005 3:26 PM Page 2 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft N ft ft ft ft de 1100 tt ftUS ftUS by//.tl4 /U.U6 33./y 4Ub4./tl 4"ISL.Utl Z4.V`J 3tlJy.04 3!tl`J./L JOtltl.y"I 11ZU.Jtl 4.V4 Oytlltltl0.yy D04LlJ.14 IVlVGIJ/.OIJ VV 14y IOJD.OJtl 6071.32 73.16 35.09 4084.27 4161.57 50.73 3928.33 3844.58 3662.05 1170.54 3.57 5981959.68 584322.49 N 70 21 38.333 W 149 18 54.171 6164.43 75.10 34.05 4109.73 4187.03 77.80 4017.89 3930.38 3735.80 1221.36 2.34 5982033.97 584372.47 N 70 21 39.058 W 149 18 52.685 6257.98 76.40 29.96 4132.76 4210.06 101.31 4108.56 4018.44 3812.67 1269.39 4.46 5982111.37 584419.65 N 70 21 39.814 W 149 18 51.280 Tie-In Survey 6351.55 74.80 26.84 4156.04 4233.34 119.28 4199.18 4107.71 3892.38 1312.50 3.65 5982191.54 584461.86 N 70 21 40.598 W 149 18 50.019 Top Window (Interp) 6391.00 74.14 24.56 4166.60 4243.90 125.05 4237.19 4145.43 3926.62 1328.98 5.81 5982225.96 584477.96 N 70 21 40.934 W 149 18 49.537 Base Window (Blind) 6403.00 76.00 24.05 4169.69 4246.99 126.53 4248.79 4156.97 3937.19 1333.75 16.03 5982236.58 584482.62 N 70 21 41.038 W 149 18 49.397 Blind (Inc Only) 6441.59 77.30 28.23 4178.61 4255.91 132.51 4286.33 4194.19 3970.89 1350.29 11.06 5982270.46 584498.78 N 70 21 41.370 W 149 18 48.914 6473.04 77.00 31.60 4185.60 4262.90 139.38 4316.99 4224.27 3997.46 1365.58 10.49 5982297.20 584513.77 N 70 21 41.631 W 149 18 48.466 6503.72 78.29 34.87 4192.17 4269.47 147.77 4346.96 4253.31 4022.52 1382.01 11.23 5982322.44 584529.92 N 70 21 41.877 W 149 18 47.986 Last Blind (Inc Only) 6534.86 79.65 38.17 4198.13 4275.43 158.00 4377.53 4282.45 4047.08 1400.19 11.28 5982347.19 584547.83 N 70 21 42.119 W 149 18 4 First MWD+IFR+MS 6565.80 80.90 41.43 4203.36 4280.66 169.83 4408.02 4310.98 4070.50 1419.71 11.14 5982370.83 584567.08 N 70 21 42.349 W 149 18 3 6596.65 82.38 43.97 4207.84 4285.14 183.08 4438.54 4338.99 4092.93 1440.41 9.45 5982393.48 584587.53 N 70 21 42.570 W 149 18 46.278 6626.01 84.02 47.86 4211.32 4288.62 197.19 4467.69 4365.09 4113.21 1461.35 14.29 5982413.99 584608.24 N 70 21 42.769 W 149 18 45.666 6658.76 83.99 50.19 4214.74. 4292.04 214.48 4500.27 4393.48 4134.56 1485.94 7.08 5982435.62 584632.59 N 70 21 42.979 W 1.49 18 44.946 6690.20 85.84 54.67 4217.53 4294.83 232.64 4531.58 4419.86 4153.65 1510.75 15.36 5982454.98 584657.19 N 70 21 43.167 W 149 18 44.221 6721.16 88.51 56.21 4219.05 4296.35 251.87 4562.50 4445.09 4171.19 1536.21 9.95 5982472.79 584682.45 N 70 21 43.339 W 149 18 43.476 6754.50 90.56 61.54 4219.33 4296.63 274.13 4595.84 4471.16 4188.42 1564.74 17.13 5982490.33 584710.78 N 70 21 43.509 W 149 18 42.642 6784.89 91.09 65.13 4218.89 4296.19 296.12 4626.22 4493.48 4202.05 1591.89 11.94 5982504.27 584737.78 N 70 21 43.643 W 149 18 41.848 6816.01 93.50 69.04 4217.64 4294.94 319.97 4657.32 4515.00 4214.16 1620.53 14.75 5982516.69 584766.27 N 70 21 43.762 W 149 18 41.010 6847.02 94.12 73.25 4215.58. 4292.88 345.06 4688.26 4534.90 4224.15 1649.80 13.69 5982527.01 584795.43 N 70 21 43.860 W 149 18 40.154 6878.57 93.84 76.34 4213.39 4290.69 371.69 4719.73 4553.71 4232.41 1680.17 9.81 5982535.60 584825.70 N 70 21 43.941 W 149 18 39.266 6909.28 93.36 80.09 4211.46 4288.76 398.56 4750.38 4570.66 4238.67 1710.17 12.29 5982542.19 584855.63 N 70 21 44.003 W 149 18 38.389 6940.63 93.62 84.48 4209.55 4286.85 426.98 4781.67 4586.24 4242.87 1741.17 14.00 5982546.73 584886.58 N 70 21 44.044 W 149 18 37.482 6972.25 91.90 87.56 4208.03 4285.33 456.47 4813.25 4600.31 4245.06 1772.67 11.15 5982549.27 584918.05 N 70 21 44.065 W 149 18 36.561 7003.60 90.35 90.35 4207.41 4284.71 486.28 4844.60 4613.00 4245.63 1804.00 10.18 5982550.19 584949.37 N 70 21 44.071 W 149 18 35.645 7034.88 90.26 93.54 4207.25 4284.55 516.48 4875.88 4624.34 4244.57 1835.26 10.20 5982549.48 584980.64 N 70 21 44.060 W 149 18 34.731 7066.55 87.79 96.15 4207.78 4285.08 547.44 4907.54 4634.50 4241.89 1866.81 11.35 5982547.16 585012.21 N 70 21 44.034 W 149 18 3 7096.70 86.02 99.03 4209.41 4286.71 577.14 4937.64 4642.97 4237.92 1896.65 11.20 5982543.51 585042.09 N 70 21 43.995 W 149 18 7127.58 87.92 102.11 4211.05 4288.35 607.78 4968.48 4650.29 4232.26 1926.95 11.71 5982538.19 585072.45 N 70 21 43.939 W 149 18 7158.47 87.43 106.15 4212.30 4289.60 638.60 4999.34 4655.93 4224.73 1956.88 13.16 5982530.99 585102.46 N 70 21 43.865 W 14916 31.175 7188.98 89.08 110.10 4213.23 4290.53 669.08 5029.84 4659.60 4215.24 1985.86 14.02 5982521.83 585131.53 N 70 21 43.771 W 149 18 30.328 7219.81 89.44 113.53 4213.63 4290.93 699.79 5060.67 4661.54 4203.79 2014.47 11.19 5982510.70 585160.27 N 70 21 43.659 W 149 18 29.491 7250.52 90.07 116.15 4213.76 4291.06 730.21 5091.38 4662.05 4190.89 2042.34 8.77 5982498.11 585188.28 N 70 21 43.532 W 149 18 28.676 7281.39 88.83 120.31 4214.05 4291.35 760.48 5122.24 4660.94 4176.29 2069.53 14.06 5982483.82 585215.62 N 70 21 43.388 W 149 18 27,881 7311.46 90.04 122.98 4214.35 4291.65 789.56 5152.31 4658.27 4160.52 2095.12 9.75 5982468.33 585241.39 N 70 21 43.233 W 149 18 27.133 7342.40 89.38 126.14 4214.51 4291.81 819.05 5183.25 4654.15 4142.97 2120.60 10.43 5982451.06 585267.06 N 70 21 43.060 W 149 18 26.388 7372.29 89.39 129.24 4214.83 4292.13 847.00 5213.14 4648.76 4124.70 2144.25 10.37 5982433.06 585290.90 N 70 21 42.881 W 149 18 25.697 7402.68 89.57 133.33 4215.10 4292.40 874.69 5243.53 4641.59 4104.65 2167.08 13.47 5982413.27 585313.95 N 70 21 42.683 W 149 18 25.029 7433.74 91.63 137.57 4214.78 4292.08 901.98 5274.59 4632.29 4082.52 2188.86 15.18 5982391.39 585335,98 N 70 21 42.466 W 149 18 24.393 7464.65 91.47 141.05 4213.94 4291.24 928.08 5305.48 4621.25 4059.10 2209.00 11.27 5982368.19 585356.38 N 70 21 42.235 W 149 18 23.804 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-250 (NM-15 )\L-250\L-250L2\L-250L2 Generated 11!28/2005 3:26 PM Page 3 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hale Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft tt ft de 1100 ft itUS ftUS 7495.11 91.81 143.74 4213.07 4290.37 952.89 5335.93 4609.03 4034.98 2227.58 8.90 5982344.28 7525.73 93.19 143.36 4211.74 4289.04 977.46 5366.52 4596.36 4010.37 2245.75 4.67 5982319.88 7556.34 92.54 143.68 4210.21 4287.51 1002.02 5397.09 4583.88 3985.79 2263.93 2.37 5982295.50 7587.06 90.25 142.15 4209.46 4286.76 1026.88 5427.80 4571.81 3961.30 2282.45 8.96 5982271.22 7617.53 89.10 140.31 4209.63 4286.93 1052.06 5458.27 4560.84 3937.54 2301.53 7.12 5982247.68 7648.28 88.70 140.43 4210.22 .4287.52 1077.72 5489.02 4550.38 3913.86 2321.13 1.36 5982224.22 7678.92 89.11 141.15 4210.81 4288.11 1103.18 5519.65 4539.94 3890.13 2340.50 2.70 5982200.70 7709.50 87.50 141.64 4211.71 4289.01 1128.39 5550.22 4529.39 3866.24 2359.57 5.50 5982177.03 7740.50 88.03 140.91 4212.92 4290.22 1153.98 5581.19 4518.95 3842.07 2378.95 2.91 5982153.08 7771.33 88.03 141.06 4213.98 4291.28 1179.52 5612.00 4508.90 3818.13 2398.35 0.49 5982129.36 7801.82 87.93 141.79 4215.05 4292.35 1204.64 5642.47 4498.93 3794.31 2417.35 2.42 5982105.76 7833.27 88.86 143.20 4215.94 4293.24 1230.23 5673.91 4488.28 3769.37 2436.49 5.37 5982081.03 7863.79 88.20 141.07 4216.72 4294.02 1255.17 5704.42 4478.31 3745.29 2455.21 7.30 5982057.16 7895.66 87.21 141.96 4217.99 4295.29 1281.39 5736.27 4468.43 3720.36 2475.03 4.18 5982032.46 7925.67 89.19 142.22 4218.94 4296.24 1305.93 5766.26 4459.02 3696.70 2493.46 6.65 5982009.00 7956.50 94.58 143.80 4217.92 4295.22 1330.83 5797.06 4449.09 3672.10 2511.99 18.22 5981984.61 7987.98 92.37 141.44 4216.01 4293.31 1356.36 5828.48 4439.35 3647.13 2531.06 10.26 5981959.86 8019.24 93.25 138.06 4214.48 4291.78 1382.61 5859.70 4431.38 3623.30 2551.23 11.16 5981936.26 8049.81 95.16 137.67 4212.24 4289.54 1408.77 5890.19 4424.77 3600.70 2571.69 6.38 5981913.88 8081.59 95.91 134.12 4209.17 4286.47 1436.45 5921.82 4419.19 3577.99 2593.70 11.37 5981891.42 8113.31 95.04 130.51 4206.15 4283.45 1464.98 5953.40 4415.80 3556.73 2617.04 11.66 5981870.43 8144.06 93.38 126.43 4203.89 4281.19 1493.51 5984.06 4414.77 3537.66 2641.05 14.29 5981851.63 8175.19 92.67 123.28 4202.25 4279.55 1523.09 6015.15 4415.90 3519.90 2666.55 10.36 5981834.15 8205.42 92.57 120.57 4200.86 4278.16 1552.26 6045.35 4418.75 3503.93 2692.18 8.96 5981818.47 8235.89 92.28 117.50 4199.57 4276.87 1582.03 6075.79 4423.36 3489.16 2718.80 10.11 5981804.00 8267.25 91.63 113.29 4198.50 4275.80 1613.03 6107.13 4430.26 3475.72 2747.10 13.58 5981790.87 8298.18 90.16 111.07 4198.02 4275.32 1643.82 6138.06 4438.96 3464.05 2775.74 8.61 5981779.52 8328.55 91.24 107.83 4197.65 4274.95 1674.16 6168.42 4449.06 3453.93 2804.37 11.24 5981769.73 8360.23 90.44 106.53 4197.18 4274.48 1705.83 6200.10 4460.97 3444.58 2834.63 4.82 5981760.71 8391.81 91.34 104.08 4196.69 4273.99 1737.39 6231.68 4473.98 3436.24 2865.08 8.26 5981752.71 8422.59 91.53 103.98 4195.92 4273.22 1768.12 6262.45 4487.45 3428.78 2894.94 0.70 5981745.59 8453.76 91.20 104.30 4195.18 4272.48 1799.25 6293.61 4501.22 3421.17 2925.15 1.47 5981738.31 8484.58 90.71 105.49 4194.67 4271.97 1830.04 6324.42 4514.63 3413.25 2954.93 4.18 5981730.72 8514.27 90.32 105.83 4194.40 4271.70 1859.72 6354.11 4527.37 3405.24 2983.52 1.74 5981723.03 8545.34 90.13 104.84 4194.28 4271.58 1890.78 6385.18 4541.02 3397.02 3013.48 3.24 5981715.14 8577.34 90.71 103.36 4194.04 4271.34 1922.74 6417.18 4555.87 3389.23 3044.52 4.97 5981707.70 8608.21 90.51 101.44 4193.71 4271.01 1953.50 6448.05 4571.16 3382.60 3074.66 6.25 5981701.40 8639.31 90.33 100.70 4193.49 4270.79 1984.44 6479.15 4587.35 3376.63 3105.18 2.45 5981695.77 8670.82 90.13 100.99 4193.36 4270.66 2015.77 6510.66 4604.01 3370.70 3136.13 1.12 5981690.19 8701.83 89.88 101.64 4193.36 4270.66 2046.63 6541.67 4620.35 3364.61 3166.54 2.25 5981684.44 585375.22 N 70 21 41.998 W 149 18 23.261 585393.66 N 70 21 41.756 W 149 18 22.730 585412.11 N 70 21 41.514 W 149 18 22.198 585430.90 N 70 21 41.273 W 149 18 21.657 585450.24 N 70 21 41.039 W 149 18 21.099 585470.11 N 70 21 40.807 W 149 18 20.526 585489.73 N 70 21 40.573 W 149 18 19.960 585509.07 N 70 21 40.338 W 149 18 19.403 585528.71 N 70 21 40.100 W 149 18 18.836 585548.37 N 70 21 39.865 W 149 18 18.269 585567.63 N 70 21 39.630 W 149 18 585587.04 N 70 21 39.385 W 149 18 1 55 585606.03 N 70 21 39.148 W 149 18 16.607 585626.12 N 70 21 38.903 W 149 18 16.028 585644.81 N 70 21 38.670 W 149 18 15.490 585663.61 N 70 21 38.428 W 149 18 14.948 585682.96 N 70 21 38.183 W 149 18 14.390 585703.39 N 70 21 37.948 W 149 18 13.801 585724.10 N 70 21 37.726 W 149 18 13:203 585746.35 N 70 21 37.502 W 149 18 12.560 585769.93 N 70 21 37.293 W 149 18 11.877 585794.14 N 70 21 37.106 W 149 18 11.176 585819.84 N 70 21 36.931 W 149 18 10.430 585845.65 N 70 21 36.774 W 149 18 9.681 585872.42 N 70 21 36.628 W 149 18 8.903 585900.87 N 70 21 36.496 W 149 18 8.075 585929.63 N 70 21 36.381 W 149 18 7.238 585958.37 N 70 21 36.282 W 149 1 585988.73 N 70 21 36.189 W 149 1 586019.27 N 70 21 36.107 W 149 18 586049.20 N 70 21 36.034 W 149 18 3.754 586079.50 N 70 21 35.959 W 149 18 2.870 586109.36 N 70 21 35.881 W 149 18 2.000 586138.03 N 70 21 35.802 W 149,18 1.164 586168.08 N 70 21 35.721 W 149 18 0.288 586199.20 N 70 21 35.644 W 149 17 59.381 586229.42 N 70 21 35.579 W 149 17 58.499 586260.00 N 70 21 35.520 W 149 17 57.607 586291.00 N 70 21 35.462 W 149 17 56.702 586321.47 N 70 21 35.402 W 149 17 55.813 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-250 (NM-15)\L-250\L-250L2\L-250L2 Generated 11!28/2005 3:26 PM Page 4 of 8 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft tt ft ft de 1100 ft ftUS ftUS t5 /;iL.tt4 tiy.y'L 1UU.y:S 41y:i.41 4L/U./1 LU//.4t3 ti5/"L.titS 4ti:iti.tf4 :f:i5t4.55 J1yfi.y5 1.Ly 5`Jii1ti/25./7 5tlb351.y5 N /U Ll S5.S4L YY 14y "I / 54.yL4 8763.33 89.99 100.82 4193.44 4270.74 2107.80 6603.17 4653.39 3352.79 3226.89 0.43 5981673.29 586381.95 N 70 21 35.285 W 149 17 54.049 8794.56 90.76 100.22 4193.23 4270.53 2138.83 6634.40 4670.65 3347.09 3257.60 3.13 5981667.93 586412.71 N 70 21 35.229 W 149 17 53.151 8826.08 91.34 98.98 4192.65 4269.95 2170.09 6665.91 4688.62 3341.84 3288.67 4.34 5981663.02 586443.84 N 70 21 35.177 W 149 17 52.243 8855.85 91.14 99.57 4192.01 .4269.31 2199.58 6695.67 4705.87 3337.04 3318.04 2.09 5981658.55 586473.26 N 70 21 35.130 W 149 17 51.384 8887.67 90.83 99.44 4191.46 4268.76 2231.13 6727.49 4724.34 3331.78 3349.42 1.06 5981653.65 586504.69 N 70 21 35.078 W 149 17 50.466 8919.29 89.53 96.90 4191.36 4268.66 2262.37 6759.11 4743.43 3327.29 3380.72 9.02 5981649.50 586536.03 N 70 21 35.034 W 149 17 49.552 8950.16 87.76 97.42 4192.09 4269.39 2292.78 6789.97 4762.61 3323.45 3411.34 5.98 5981646.00 586566.69 N 70 21 34.996 W 149 17 48.656 8981.32 88.13 97.46 4193.21 4270.51 2323.49 6821.11 4781.98 3319.41 3442.21 1.19 5981642.31 586597.61 N 70 21 34.956 W 149 17 47.754 9012.69 87.87 98.29 4194.31 4271.61 2354.45 6852.46 4801.42 3315.12 3473.27 2.77 5981638.36 586628.71 N 70 21 34.914 W 149 17 46.846 9042.96 87.40 98.23 4195,55 4272.85 2384.34 6882.70 4820.13 3310.77 3503.20 1.57 5981634.35 586658.68 N 70 21 34.871 W 149 17 9074.12 89.25 99.22 4196.47 4273.77 2415.17 6913.85 4839.32 3306.05 3533.98 6.73 5981629.96 586689.51 N 70 21 34.824 W 149 17 9104.09 90.24 99.65 4196.60 4273.90 2444.88 6943.82 4857.61 3301.14 3563.55 3.60 5981625.38 586719.13 N 70 21 34.776 W 149 17 4 6 9134.96 90.30 99.33 4196.45 4273.75 2475.48 6974.69 4876.55 3296.05 3593.99 1.05 5981620.63 586749.62 N 70 21 34.725 W 149 17 43.316 9165.84 90.30 99.87 4196.29 4273.59 2506.11 7005.57 4895.57 3290.90 3624.44 1.75 5981615.82 586780.12 N 70 21 34.675 W 149 17 42.426 9197.27 90.63 99.55 4196.04 4273.34 2537.28 7037.00 4915.00 3285.60 3655.42 1.46 5981610.86 586811.16 N 70 21 34.622 W 149 17 41.520 9228.51 87.43 97.00 4196.57 4273.87 2568.15 7068.23 4935.04 3281.10 3686.32 13.10 5981606.71 586842.11 N 70 21 34.578 W 149 17 40.617 9259.44 86.51 97.84 4198.20 4275.50 2598.61 7099.11 4955.32 3277.11 3716.95 4.03 5981603.06 586872.77 N 70 21 34.539 W 149 17 39.721 9290.34 86.65 97.99 4200.04 4277.34 2629.07 7129.96 4975.48 3272.86 3747.50 0.66 5981599.16 586903.37 N 70 21 34.497 W 149 17 38.828 9321.74 87.97 99.05 4201.52 4278.82 2660.10 7161.32 4995.84 3268.22 3778.52 5.39 5981594.85 586934.43 N 70 21 34.451 W 149 17 37.921 9352.11 89.39 98.56 4202.22 4279.52 2690.15 7191.69 5015.55 3263.57 3808.52 4.95 5981590.54 586964.48 N 70 21 34.405 W 149 17 37.044 9382.87 88.93 98.18 4202.67 4279.97 2720.56 7222.44 5035.80 3259.09 3838.95 1.94 5981586.40 586994.95 N 70 21 34.361 W 149 17 36.155 9414.35 90.29 98.99 4202.88 4280.18 2751.70 7253.92 5056.54 3254.39 3870.08 5.03 5981582.05 587026.13 N 70 21 34.314 W 149 17 35.245 9445.16 89.71 98.79 4202.88 4280.1 B 2782.21 7284.73 5076.82 3249.63 3900.52 1.99 5981577.63 587056.62 N 70 21 34.267 W 149 17 34.355 9476.90 89.80 98.08 4203.02 4280.32 2813.59 7316.47 5098.02 3244.98 3931.91 2.25 5981573.32 587088.06 N 70 21 34.221 W 149 17 33.437 9508.23 85.93 96.31 4204.18 4281.48 2844.44 7347.77 5119.53 3241.06 3962.97 13.58 5981569.74 587119.15 N 70 21 34.183 W 149 17 32.529 9539.61 88.61 96.95 4205.68 4282.98 2875.27 7379.11 5141.38 3237.44 3994.10 8.78 5981566.47 587150.32 N 70 21 34.147 W 149 17 31.619 9570.90 86.94 94.30 4206.89 4284.19 2905.93 7410.38 5163.67 3234.37 4025.21 10.00 5981563.75 587181.46 N 70 21 34.117 W 149 17 30.709 9602.34 88.15 94.19 4208.24 4285.54 2936.56 7441.79 5186.68 3232.05 4056.54 3.86 5981561.78 587212.81 N 70 21 34.094 W 149 17 29. 93 9633.41 88.07 95.48 4209.27 4286.57 2966.92 7472.84 5209.29 3229.43 4087.48 4.16 5981559.50 587243.77 N 70 21 34.068 W 149 17 9665.16 90.53 96.29 4209.65 4286.95 2998.08 7504.59 5232.10 3226.17 4119.06 8.16 5981556.60 587275.38 N 70 21 34.036 W 149 17 27.966 9695.88 91.39 100.25 4209.14 4286.44 3028.43 7535.30 5253.34 3221.76 4149.45 13.19 5981552.52 587305.81 N 70 21 33.992 W 149 17 27.077 9725.71 91.94 103.15 4208.27 4285.57 3058.12 7565.12 5272.74 3215.71 4178.64 9.89 5981546.80 587335.07 N 70 21 33.932 W 149 17 26.224 9756.82 91.19 106.81 4207.42 4284.72 3089.19 7596.22 5291.70 3207.68 4208.68 12.00 5981539.10 587365.19 N 70 21 33.853 W 149 17 25.346 9788.46 90.39 111.42 4206.99 4284.29 3120.80 7627.86 5309.26 3197.32 4238.56 14.79 5981529.07 587395.19 N 70 21 33.751 W 149 17 24.472 9818.60 90.62 114.74 4206.72 4284.02 3150.76 7657.99 5324.34 3185.50 4266.28 .11.04 5981517.57 587423.04 N 70 21 33.635 W 149 17 23.662 9850.42 90.49 118.55 4206.41 4283.71 3182.12 7689.81 5338.67 3171.24 4294.72 11.98 5981503.62 587451.62 N 70 21 33.494 W 149 17 22.831 9881.19 89.97 121.99 4206.29 4283.59 3212.06 7720.58 5350.90 3155.73 4321.29 11.31 5981488.41 587478.36 N 70 21 33.342 W 149 17 22.054 9912.12 89.91 126.78 4206.32 4283.62 3241.57 7751.51 5361.29 3138.27 4346.81 15.49 5981471.23 587504.07 N 70 21 33.170 W 149 17 21.308 9942.77 90.39 128.22 4206.24 4283.54 3270.27 7782.16 5370.16 3119.61 4371.12 4.95 5981452.85 587528.59 N 70 21 32.986 W 149 17 20.598 9975.20 90.52 129.14 4205.98 4283.28 3300.40 7814.59 5379.09 3099.34 4396.44 2.86 5981432.86 587554.13 N 70 21 32.787 W 149 17 19.858 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-250 (NM-15 )\L-250\L-250L2\L-250L2 Generated 1112812005 3:26 PM Page 5 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easling Latitude Longitude Depth Section Departure ft de de (t ft ft it tt ft it de 1100 ft (tUS ftUS 1000b.9a a9.b:i 1La.b4 41U5.y/ 4La.S.L/ :S3La.aa /a45.J/ b:Sa/.f>4 :SUtfU.U4 44LU.4"I S./b bya"1413.a.S D25/b/tl.J"1 IV /V L"I 3L.by/ VV 14y I / ly."15/ 10037.30 89.55 127.82 4206.22 4283.52 3358.16 7876.69 5396.86 3060.68 4445.03 2.30 5981394.75 587603.14 N 70 21 32.406 W 149 17 18.438 10067.97 90.27 127.11 4206.27 4283.57 3386.89 7907.36 5406.40 3042,02 4469.37 3.30 5981376.37 587627.69 N 70 21 32.223 W 149 17 17.726 10098.43 90.49 129.97 4206.07 4283.37 3415.21 7937.82 5415.50 3023.05 4493.20 9.42 5981357.66 587651.72 N 70 21 32.036 W 149 17 17.030 10130.64 90.92 130.70 4205.67 4282.97 3444.78 7970.03 5424.32 3002.20 4517.75 2.63 5981337.09 587676.49 N 70 21 31.831 W 149 17 16.313 10161.36 89.95 127.83 4205.44 4282.74 3473.20 8000.74 5433.45 2982.76 4541.53 9.86 5981317.91 587700.49 N 70 21 31.639 W 149 17 15.618 10191.73 88.56 127.19 4205.83 4283.13 3501.63 8031.11 5443.50 2964.27 4565.61 5.04 5981299.69 587724.78 N 70 21 31.457 W 149 17 14.914 10223.56 89.11 128.02 4206.48 4283.78 3531.41 8062.93 5454.16 2944.85 4590.83 3.13 5981280.56 587750.20 N 70 21 31.266 W 149 17 14.177 10254.53 91.52 127.02 4206.31 4283.61 3560.41 8093.90 5464.73 2925.99 4615.39 8.42 5981261.97 587774.97 N 70 21 31.080 W 149 17 13.459 10285.34 89.63 124.44 4206.00 4283.30 3589.58 8124.71 5476.29 2908.00 4640.39 10.38 5981244.26 587800.17 N 70 21 30.903 W 149 17 12.729 10316.58 87.43 124.13 4206.80 4284.10 3619.39 8155.94 5488.89 2890.41 4666.20 7.11 5981226.96 587826.16 N 70 21 30.730 W 149 17 10347.86 87.09 123.73 4208.30 4285.60 3649.28 8187.18 5501.81 2872.97 4692.12 1.68 5981209.81 587852.28 N 70 21 30.559 W 149 17 10379.22 87.92 123.31 4209.66 4286.96 3679.31 8218.51 5515.13 2855.67 4718.24 2.97 5981192.80 587878.58 N 70 21 30.388 W 149 17 1 4 10410.11 87.67 126.67 4210.85 4288.15 3708.66 8249.38 5527.67 2837.97 4743.52 10.90 5981175.39 587904.06 N 70 21 30.214 W 149 17 9.715 10441.58 90.17 127.25 4211.44 4288.74 3738.22 8280.84 5539.61 2819.06 4768.66 8.15 5981156.76 587929.41 N 70 21 30.028 W 149 17 8.980 10472.36 90.51 129.31 4211.26 4288.56 3766.90 8311.62 5550.77 2799.99 4792.82 6.78 5981137.96 587953.77 N 70 21 29.840 W 149 17 8.274 10503.80 88.63 126.82 4211.50 4288.80 3796.23 8343.06 5562.44 2780.61 4817.57 9.92 5981118.86 587978.73 N 70 21 29.649 W 149 17 7.551 10534.32 87.18 127.89 4212.61. 4289.91 3824.81 8373.56 5574.26 2762.10 4841.82 5.90 5981100.62 588003.18 N 70 21 29.467 W 149 17 6.843 10565.52 86.67 127.21 4214.29 4291.59 3853.98 8404.71 5586.38 2743.12 4866.52 2.72 5981081.91 588028.09 N 70 21 29.280 W 149 17 6.121 10596.88 88.21 130.30 4215.69 4292.99 3883.07 8436.04 5598.11 2723.51 4890.94 11.00 5981062.58 588052.73 N 70 21 29.087 W 149 17 5.407 10628.50 89.03 130.36 4216.45 4293.75 3912.09 8467.65 5609.29 2703.05 4915.04 2.60 5981042.39 588077,05 N 70 21 28.886 W 149 17 4.703 10659.12 88.38 128.98 4217.14 4294.44 3940.33 8498.26 5620.59 2683.51 4938.60 4.98 5981023.11 588100.82 N 70 21 28.694 W 149 17 4.014 10689.99 87.73 128.82 4218.19 4295.49 3968.95 8529.11 5632.51 2664.13 4962.61 2.17 5981004.01 588125.05 N 70 21 28.503 W 149 17 3.313 10720.90 88.97 125.70 4219.08 4296.38 3997.92 8560.01 5645.39 2645.43 4987.20 10.86 5980985.58 588149.64 N 70 21 28.319 W 149 17 2.594 10751.50 87.63 122.22 4219.99 4297.29 4027.17 8590.60 5659.86 2628.35 5012.57 12.18 5980968.78 588175.39 N 70 21 28.151 W 149 17 1.853 10782.56 88.72 119.70 4220.98 4298.28 4057.29 8621.64 5676.08 2612.38 5039.18 8.84 5980953.11 588202.18 N 70 21 27.993 W 149 17 1.075 10813.82 89.01 116.94 4221.60 4298.90 4087.93 8652.89 5693.74 2597.55 5066.69 8.88 5980938.60 588229.85 N 70 21 27.847 W 149 17 0.271 10844.57 88.88 113.81 4222.16 4299.46 4118.34 8683.64 5712.50 2584.38 5094.47 10.19 5980925.73 588257.77 N 70 21 27.718 W 149 16 59.460 10876.13 89.19 110.86 4222.69 4299.99 4149,75 8715,19 5733.15 2572.39 5123,65 9.40 5980914.07 588287.08 N 70 21 27.600 W 149 16 58. 07 10906.78 88.04 107.23 4223.43 4300.73 4180.37 8745.83 5754.59 2562.39 5152.61 12.42 5980904.39 588316.15 N 70 21 27.501 W 149 16'.~ 10938.75 88.53 107.54 4224.39 4301.69 4212.32 8777.79 5777.68 2552.85 5183.11 1.81 5980895.19 588346.74 N 70 21 27.407 W 149 16 56.869 10969.47 88.91 106.91 4225.08 4302.38 4243.03 8808.50 5800.02 2543.75 5212.44 2.39 5980886.42 588376.17 N 70 21 27.317 W 149 16 56.011 11001.18 89.12 107.86 4225.62 4302.92 4274.74 8840.21 5823.10 2534.28 5242.70 3.07 5980877.28 5884011.53 N 70 21 27.224 W 149 16 55.127 11032.17 88.39 107.26 4226.30 4303.60 4305.72 8871.19 5845.66 2524.93 5272.24 3.05 5980868.26 588436.17 N 70 21 27.132 W 149 16 54.264 11063.25 87.34 105.17 4227.45 4304.75 4336.77 8902.25 5868.85 2516.26 5302.06 7.52 5980859.92 588466.08 N 70 21 27.046 W 149 16 53.392 11094.17 86.72 107.36 4229.06 4306.36 4367.65 8933.13 5891.96 2507.61 5331.70 7.35 5980851.61 588495.81 N 70 21 26.961 W 149 16 52.526 11125.39 89.58 109.47 4230.06 4307.36 4398.84 8964.33 5914.59 2497.75 5361.30 11,38 5980842.08 588525.52 N 70 21 26.864 W 149 16 51.661 11156.29 90.43 108.84 4230.06 4307.36 4429.71 8995.23 5936.80 2487.61 5390.49 3.42 5980832.27 588554.82 N 70 21 26.764 W 149 16 50.807 11186.39 90.19 109.04 4229.90 4307.20 4459.79 9025.33 5958.59 2477.85 5418.96 1.04 5980822.82 588583.39 N 70 21 26.668 W 149 16 49.975 11217.96 90.12 110.23 4229.81 4307.11 4491.33 9056.90 5981.26 2467.24 5448.69 3.78 5980812.54 588613.24 N 70 21 26.563 W 149 16 49.106 11249.38 89.75 110.34 4229.85 4307.15 4522.70 9088.32 6003.66 2456.34 5478.16 1.23 5980801.97 588642.82 N 70 21 26.456 W 149 16 48.245 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-250 (NM-15)\L-250\L-250L2\L-250L2 Generated 11/28!2005 3:26 PM Page 6 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft it ft ft ft de I1U11 tt ftUS ftUS 1lYtlU.bl iS/.bU "IUy.4y 4G3U.b/ 4JU/.t3/ 4bb3.tltf al'I`J.b4 bVGb.l3 G44O./l bbU/AG /.4u bybu/yi.b/ ooobrc.cy rv /uci Go.oai vv i4a ib4r.JO/ 11311.19 87.58 110.02 4231.86 4309.16 4584.39 9150.09 6048.26 2435.38 5536.27 1.73 5980781.66 588701.15 N 70 21 26.249 W 149 16 46.547 11341.99 87.87 108.37 4233.08 4310.38 4615.14 9180.86 6070.82 2425.26 5565.34 5.44 5980771.87 588730.33 N 70 21 26.150 W 149 16 45.697 11373.66 88.93 106.24 4233.96 4311.26 4646.80 9212.52 6094.80 2415.85 5595.56 7.51 5980762.79 588760.65 N 70 21 26.057 W 149 16 44.814 11404.36 89.34 105.58 4234.43 4311.73 4677.49 9243.22 6118.60 2407.43 5625.08 2.53 5980754.70 588790.26 N 70 21 25.974 W 149 16 43.951 11435.67 88.10 104.70 4235.13 4312.43 4708.78 9274.52 6143.19 2399.26 5655.29 4.86 5980746.86 588820.56 N 70 21 25.893 W 149 16 43.068 11467.33 87.97 105.30 4236.21 4313.51 4740.40 9306.16 6168.16 2391.07 5685.86 1.94 5980739.02 588851.21 N 70 21 25.812 W 149 16 42.175 11498.73 86.45 104.00 4237.74 4315.04 4771.73 9337.52 6193.08 2383.14 5716.20 6.37 5980731.42 588881.63 N 70 21 25.734 W 149 16 41.288 11529.78 85.90 102.32 4239.81 4317.11 4802.64 9368.50 6218.24 2376.08 5746.36 5.68 5980724.70 588911.87 N 70 21 25.665 W 149 16 40.406 11561.24 85.33 102.03 4242.22 4319.52 4833.90 9399.87 6244.07 2369.47 5777.03 2.03 5980718.43 588942.60 N 70 21 25.599 W 149 16 39.510 11592.27 86.73 101.77 4244.37 4321.67 4864.74 9430.83 6269.70 2363.09 5807.32 4.59 5980712.39 588972.96 N 70 21 25.536 W 149 1 5 11622.90 88.99 100.51 4245.51 4322.81 4895.18 9461.43 6295.30 2357.17 5837.35 8.45 5980706.81 589003.05 N 70 21 25.478 W 149 1 7 11654.35 89.04 99.34 4246.05 4323.35 4926.39 9492.88 6322.02 2351.75 5868.32 3.72 5980701.73 589034.08 N 70 21 25.424 W 149 16 41 11685.31 89.07 100.48 4246.56 4323.86 4957.11 9523.83 6348.36 2346.43 5898.81 3.68 5980696.74 589064.63 N 70 21 25.372 W 149 16 35.950 11716.49 89.14 101.84 4247.05 4324.35 4988.13 9555.01 6374.57 2340.39 5929.40 4.37 5980691.05 589095.27 N 70 21 25.312 W 149 16 35.056 11748.00 88.24 101.50 4247.77 4325.07 5019.49 9586.51 6400.95 2334.02 5960.25 3.05 5980685.02 589126.19 N 70 21 25.249 W 149 16 34.154 11778.63 88.04 102.45 4248.76 4326.06 5049.99 9617.13 6426.55 2327.67 5990.20 3.17 5980679.00 589156.20 N 70 21 25.186 W 149 16 33.279 11809.89 89.71 102.54 4249.38 4326.68 5081.15 9648.38 6452.56 2320.91 6020.71 5.35 5980672.58 589186.79 N 70 21 25.120 W 149 16 32.387 11840.30 87.72 101.04 4250.06 4327.36 5111.42 9678.78 6478.11 2314.69 6050.47 8.19 5980666.70 589216.61 N 70 21 25.058 W 149 16 31.517 11870.88 85.79 98.39 4251.79 4329.09 5141.71 9709.31 6504.39 2309.54 6080.56 10.71 5980661.88 589246.75 N 70 21 25.008 W 149 16 30.638 11902.71 86.63 98.85 4253.89 4331.19 5173.13 9741.07 6532.08 2304.78 6111.96 3.01 5980657.47 589278.20 N 70 21 24.960 W 149 16 29.720 11933.19 86.85 98.75 4255.63 4332.93 5203.25 9771.50 6558.59 2300.13 6142.03 0.79 5980653.15 589308.32 N 70 21 24.914 W 149 16 28.841 11964.33 86.80 99.17 4257.35 4334.65 5234.04 9802.59 6585.67 2295.28 6172.74 1.36 5980648.65 589339.08 N 70 21 24.867 W 149 16 27.943 11995.89 86.76 99.33 4259.12 4336.42 5265.27 9834.10 6613.08 2290.22 6203.84 0.52 5980643.93 589370.23 N 70 21 24.816 W 149 16 27.034 12027.43 86.00 99.08 4261.12 4338.42 5296.45 9865.58 6640.50 2285.18 6234.91 2.54 5980639.24 589401.36 N 70 21 24.767 W 149 16 26.126 12059.10 85.47 99.65 4263.47 4340.77 5327.76 9897.16 6668.01 2280.05 6266.08 2.45 5980634.45 589432.57 N 70 21 24.716 W 149 16 25.215 12089.97 87.91 101.46 4265.25 4342.55 5358.38 9927.98 6694.56 2274.40 6296.37 9.84 5980629.14 589462.92 N 70 21 24.660 W 149 16 24.330 12121.18 88.12 102.49 4266.33 4343.63 5389.45 9959.17 6721.08 2267.93 6326.88 3.37 5980623.01 589493.50 N 70 21 24.596 W 149 16 23.438 12152.99 86.58 102.45 4267.80 4345.10 5421.13 9990.94 6747.99 2261.07 6357.91 4.84 5980616.49 589524.60 N 70 21 24.528 W 149 161 12184.02 86.22 103.15 4269.75 4347.05 5452.02 10021.91 6774.17 2254.21 6388.11 2.53 5980609.97 589554.87 N 70 21 24.461 W 149 16 8 12215.43 85.14 103.79 4272.12 4349.42 5483.26 10053.23 6800.48 2246.91 6418.56 3.99 5980603.01 589585.40 N 70 21 24.389 W 149 16 20.758 12246.38 87.54 105.17 4274.09 4351.39 5514.13 10084.12 6826.18 2239.19 6448.47 8.94 5980595.62 589615.39 N 70 21 24.313 W 149 16 19.884 12276.83 89.04 106.79 4275.00 4352.30 5544.56 10114.55 6851.09 2230.81 6477.73 7.25 5980587.57 589644.73 N 70 21 24.230 W 149 16 19.029 12308.19 87.16 107.38 4276.04 4353.34 5575.90 10145.89 6876.44 2221.60 6507.68 6.28 5980578.70 589674.79 N 70 21 24.139 W 149 16 18.153 12338.69 87.40 106.47 4277.49 4354.79 5606.37 10176.36 6901.18 2212.73 6536.83 3.08 5980570.15 589704.03 N 70 21 24.052 W 149 16 17.302 12369.42 87.52 106.95 4278.85 4356.15 5637.07 10207.06 6926.23 2203.91 6566.23 1.61 5980561.65 589733.52 N 70 21 23.965 W 149 16 16.442 12400.73 87.86 106.47 4280.11 4357.41 5668.35 10238.34 6951.79 2194.91 6596.20 1.88 5980552.99 589763.58 N 70 21 23.876 W 149 16 15.567 12430.88 86.98 108.22 4281.47 4358.77 5698.47 10268.46 6976.26 2185.93 6624.94 6.49 5980544.33 589792.43 N 70 21 23.787 W 149 16 14.726 12462.73 87.73 109.25 4282.94 4360.24 5730.27 10300.28 7001.70 2175.71 6655.07 4.00 5980534.45 589822.66 N 70 21 23.687 W 149 16 13.846 12494.91 86.79 108.54 4284.48 4361.78 5762.39 10332.42 7027.39 2165.30 6685.48 3.66 5980524.38 589853.19 N 70 21 23.584 W 149 16 12.957 12524.96 86.30 108.80 4286.29 4363.59 5792.38 10362.42 7051.49 2155.70 6713.90 1.85 5980515.10 589881.71 N 70 21 23.489 W 149 16 12.127 SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-250 (NM-15 )\L-250\L-250L2\L-250L2 Generated 11/28/2005 3:26 PM Page 7 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de tt ft ft ft ft ft ft de /100 ft ftUS ftUS 11557.37 135.39 10t1.L/ 41tit1.(i4 43(i5.y4 5tt14.(i9 1U3y4./4 /U//.5(i 1145.43 ti/44.55 3.15 SytiU5U5.1ti Last MWD+IFR+MS 12587.77 84.63 109.21 4291.28 4368.58 5854.96 10425.03 7101.96 2135.70 6773.23 3.97 5980495.75 TD (Projected) 12635.00 84.63 109.21 4295.70 4373.00 5901.95 10472.05 7139.71 2120.22 6817.63 0.00 5980480.78 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots --Gyrodata gyro orientation surveys. Not to be run above 70 degrees inclination. ) MWD +IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Description: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 2563 FSL 3721 FEL S34 T12N R11 E UM 5978285.20 583192.78 BHL : 4680 FSL 2180 FEL S35 T12N R11 E UM 5980480.78 589985.81 5t3991L.4ti N /U 11 13.32311 VV 149 Ili 11.1:11 589941.24 N 70 21 23.292 W 149 16 10.393 589985.81 N 70 21 23.139 W 149 16 9.095 • SurveyEditor Ver SP 1.0 Bld( doc40x_56) L-250 (NM-15)\L-250\L-250L2\L-250L2 Generated 11/28/2005 3:26 PM Page 8 of 8 TRE1== FMC4-1/8" 5M WELLHEAD = FMC GEN 5 ACTUATOR = KB. l3EV = 77.30' BF. ELEV = 48.8' KOP = 700 Max Angle=L1 100 @ 6899' Datum MD = xxxx' Datum TVD - xxxx' SS • - ~ 20" CONDUCTOR ~ 109' 10-3/4" CSG. 45.5 L-80, ~ = 9.95" 3354' Minimum ID = 3.688" @ 6386' and 6601 in the LEM X4.5"PHOENIX DSCHRGE-PRESS SUB,ID = 3.948" ~-~ 6180' (4.5" PHNDC MLN_TFPRESS SENSOR, ID = 3.994" ~ 6215' RA TAG 6337' 7-5/8" x 5.5" BKR ZXP PACKER, ~ = 4.95" 6349' HOOK HGR O = 5.62" I-( 6386' -5/8" x 5.5" BKR ZXP PACKER, ID = 5.75" 1-i 6544' ~RA TAG I-I s547' BKR HUGHES HOOK HGR, ~ = 5.62" 6601' ~ 7-5/8" x 5.5" BKR ZXP PACKER ID = 4.82" ~-~ 6693' PERFORATION SUMMARY REF LOG : ANGLE AT TOP PERF: 92° @ 8262' Note: Refer to Production DB for histor~ai pert data SQE SPF NVTERVAL OpNSgz DATE 4" SCRN NB L2 8262-12174 O 11/30/05 4" SCRN NB L1 6932-11191 O 11!14/05 4 1/2" SLTD OA 7523-8460 O 11/09/05 L-250 L-250 L1 L-250 L2 ~tyinfo: FRAM DRLG -DRAFT 1000' --i 10 3/4" TAM Port Collar i 2669' 4-1/2" HES X NIP, ~ = 3.813" GAS LN= f MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3148 2505 54 KBG2 DOME BK 16 12/08/05 3 4824 3510 53 KBG2 DOME BK 16 12/08/05 2 5961 4126 68 KBG2 DMY BK 0 12/02/05 1 6071 4161 73 KBG2 SO BK 22 12/08/05 i 6191' 4.5" Baker CMD-BX Sliding Sleeve, 3.812" ID 6240' 7.625" x 4.5" Premier Packer 3.87" ID 6307' 4.5" HES X nipple, ~ 3.813" 6328' 4.5" HES X nipple, ID 3.813" 6356' 4.5" Guide Shoe 6443-6453 4" x 6.4" Sw eN Packer 3.476" N}RA Tag @6436' 8158-8168 4" x 6.4" Sw eli Packer 3.476" N}RA Tag @ 8150' 8262-12175 4" L-80 9.5/10.9 N3T-M solid/screen 3.476 ~ - L2 9739-9749 4" x 6.4" Swell Packer 3.476" N}RA Tag @ 9731' 12260' 4.5" 12.6# L-80 N3T-M shoe (12,258' PBTD) - L2 1 6574' 1 ~4-1/2" Seal Assembly from LEM # 2 1 ^ ^ ------- - --~-- rr \ 6563-6583 Baker Seal Bore Extension w ith 4.75 ~ - L1 6666-6677 4" x 6.4" Sw ell Packer 3.476" N}RA Tag @ 6659' 6635-11191 4" 10.9# L-80 N3T-M solid/screen 3.476 ~ - L1 10262-10362 4" x 6.4" Swell Packer 3.476" N}RA Tag @ 10254' 11273' 4.5" 12.6# L-80 IBT-M shoe (11271' PBTD) - L1 6728' 4-1/2" Seal Assembly from LEM #1. 6717-6736 Baker Seal Bore Extension w ith 4.75 ~ \ 6762-6763 Magnumdisk Cerani~c shear sub (Not sheared) 7418' 7 5/8 29.7# L-80 BTGM casing w ith 6.8751D 1 - - - - ~ _ - - 7523-8460 4 1/2 BTC 12.6# slotted liner w ith 3.958 ID 8521-8531 Sw eN packer elements w ent in the hole at 6.4 OD 8587• 4 1/2 F/C (PBTD once shear disk is gone @ E 8632' H4 1/2 N3T L-80 12.6# solid Nner from 84f DATE REV BY COMMENTS DATE REV BY COMMENTS 12/02!05 AM!JF ORIGNVAL COMPLETION 12/08/05 KDGPJC GLV GO ORION UNIT WELL: L-250, L-250 L1, L-250 L2 PERMfT No: 205-152 (153) (154) API No: 50-029-23281-00 (60) (61) SEC 34, T12N, R11 ~ 2563' NSL & 3721' WEL BP Exploration (Alaska) SCHLUMBERGER Survey report Client ...................: BP Exploration (Alaska) Inc. Field ..................... Orion Well ...................... L-250L2 API number ...............: 50-029-23281-61 Engineer...,,,,,,,,,,,,,,,, F.Medina RIG :...................... Nabors-9ES STATE :.................... Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ---- Permanent datum..........: Depth reference..........: GL above permanent.......: KB above permanent.......: DF above permanent.......: Mean Sea Level Driller's Pipe Tally 48.80 ft N/A Top Drive 77.30 ft ----- Vertical section origin-----.'---------- Latitude (+N/S-).......... 0.00 ft Departure (+E/W-)......... -0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 10.20 degrees 26-Nov-2005 20:23:06 Page 1 of 11 Spud date ................. 24-Oct-2005 Last survey date.........: 26-Nov-05 Total, accepted surveys...: 271 MD of first survey.......: 0.00 ft MD of last survey........: 12635.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2005 Magnetic date ............. 19-Nov-2005 Magnetic field strength..: 1151.55 HCNT Magnetic dec (+E/W-).....: 24.41-degrees Magnetic dip .............. 80.85:. degrees ----- MWD survey Reference Reference G ............... Reference H ............. Reference Dip. ....... .. Tolerance of G. ... .. Tolerance of H. .... ... Tolerance of Dip.......... Criteria --------- 1002.68 meal 1151.54 HCNT 80.85 degrees (+/-) 2.50 meal (+/-) 6..00 HCNT (+/-) 0.45 degrees ----- Corrections ----------------------g---- Magnetic dec (+E/W-).....: 24.41 de rees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 24..41 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction ~,OS''--~ S``~ SCHLUMBERGER Survey Report 26-Nov-2005 20:23:06 Page 2 of -- -------- ---------------- --------------= Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At # depth angle angle length depth section +N/S- +E/W- displ Azim - (ft) (deg) (deg) (ft) (f t) (ft) (ft) (ft) (ft) (deg) --- - ---------------- --------------- 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 100.Q0 0.18 72.13 100.00 100.00 0.07 0.05 0.15 0.16 72.13 3 200.00 0.28 91.26 100.00 200.00 0.19 0.09 0.54 0.55 80.49 4 300.00 0.33 67.69 100.00 300.00 0.38 0.19 1.05 1.07 79.52 5 400.00 0.48 65.03 100.00 399.99 0.77 0.48 1.70 1.77 74.20 6 500.00 0.38 60.50 100.00 499.99 1.23 0.82 2.37 2.51 70.88 7 600.00 4.63 0.90 100.00 599.88 5.42 5.02 2.72 5.71 28.45 8 700.00 7.22 2.14 100.00 699.34 15.63 15.34 3.02 15.63 11.13 9 800.00 9.47 358.78 100.00 798.27 29.92 29.85 3.08 30.00 5.89 10 900.00 10.55 0.97 100.00 896.75 47.02 47.22 3.06 47.32 3.71 11 1000.00 12.85 1.98 100.00 994.66 67.06 67.49 3.60 67.59 3.05 12 1100.00 18.01 1.78 100.00 1091.03 93.38 94.08 4.46 94.18 2.72 13 1142.48 17.42 2.28 42.48 1131.49 106.17 106.99 4.92 107.11 2.63 14 1238.55 23.54 359.82 96:07 1221.45 139.32 140.58 5.43 140.69 2.21 15 1333.71 28.06 359.38 95.16 1307.10 180.02 181.98 5.13 182.06 1.61 16 1426.70 33.77 1.48 92.99 1386.85 227.09 229.73 5.56 229.80 1.39 17 1521.00 39.49 3.27 94.30 1462.50 282.80 285.92 7.95 286.03 1.59 18 1615.30 41.59 2.81 94.30 1534.16 343.62 347.12 11.20 347.30 1.85 19 1709.51 43.47 4.55 94.21 1603.58 406.88 410.66 15.30 410.95 2.13 20 1803.55 48.15 5.70 94.04 1669.11 474.03 477.80 21.35 478.28 2.56 21 .1897.74 50.17 6.38 94.19 1730.71 545.09 548.66 28.85 549.42 3.01 22 1992.59 50.39 5.96 94.85 1791.32 617.87 621.19 36.69 622.27 3.38 23 2087.57 50.71 5.82 94.98 1851.67 691.00 694.14 44.22 695.55 3.64 24 2182.43 50.72 6.03 94.86 1911.73 764.22 767.17 51.80 768.92 3.86 25 2278.30 50.98 6.67 95.87 1972.26 838.40 841.06 60.02 843.20 4.08 26 2371.54 50.42 6.76 93.24 2031.32 910.42 912.72 68.46 915.29 4.29 27 2466.47 50.95 6.67 94.93 2091.46 983.73 985.66 77.05 988.67 4.47 28 2561.66 51.25 6.75 95.19 2151.24 1057.67 1059.24 85.70 1062.70 4.63 29 2655.99 50.76 6.72 94.33 2210.60 1130.85 1132.04 94.30 1135.96 4.76 30 2750.38 51.58 6.48 94.39 2269.78 1204.24 1205.09 102.75 1209.46 4.87 11 DLS Srvy Tool (deg/ tool Corr 100f) type (deg) 0.00 TIP None 0.18 BP_GYD CT DMS 0.12 BP_GYD CT DMS 0.13 BP_GYD CT DMS 0.15 BP GYD CT DMS 0.11 BP_GYD CT DMS • 4.45 BP_GYD CT DMS 2.59 BP_GYD CT DMS 2.30 BP_GYD CT DMS 1.14 BP GYD CT DMS 2.31 BP_GYD CT DMS 5.16 BP_MWD+IFR+MS 1.43 BP_MWD+IFR+MS 6.43 BP_MWD+IFR+MS 4.75 BP MWD+IFR+MS 6.2.5 BP_MWD+IFR+MS 6.17 BP_MWD+IFR+MS 2.25 BP_MWD+IFR+MS 2.35 BP_MWD+IFR+MS 5.05 BP MWD+IFR+MS 2.21 BP_MWD+IFR+MS 0.41 BP_MWD+IFR+MS 0.36 BP_MWD+IFR+MS 0.17 BP_MWD+IFR+MS 0.58 BP MWD+IFR+MS 0.61 BP_MWD+IFR+MS 0.56 BP_MWD+IFR+MS 0.32 BP_MWD+IFR+MS 0.52 BP_MWD+IFR+MS 0.89 BP MWD+IFR+MS SCHLUMBERGER Survey Report 26-Nov-2005 20:23:06 Page 3 of 11 Seq Measured Incl Azimuth Course TVD # depth angle angle length depth - (f t) (deg) (deg) (ft) (ft) 31 2842.88 54,02 5.92 92.50 2325 70 32 2938.01 54.48 5.76 95.13 2381.28 33 3030.50 54.05 5.73 92.49 2435.30 34 3124.67 53.78 5.75 94.17 2490.76 35 3217.96 53.69 5.83 93.29 2545.94 36 3304.80 54,42 5.76 86.84 2596.92 37 3377.66 54.50 7.88 72.86 2639.27 38 3460.47 55.12 11.54 82.81 2687.01 39 3553.53 54.96 16.27 93.06 2740.35 40 3646.38 54.07 21.14 92.85 2794.27 41 3739.41 53.06 24.30 93.03 2849.53 42 3833.63 53.64 25.65 94.22 2905.77 43 3926.05 51.52 27.14 92.42 2961.93 44 4019.45 51.26 27.27 93.40 3020.22 45 4112.37 51.19 26.85 92.92 3078.41 46 4204.46 51.42 26.73 92.09 3135.98 47 4297.65 51.71 29.80 93.19 3193.92 48 4392.61 51.45 30.78 94.96 3252.93 49 4485.21 53.60 29.48 92.60 3309.27 50 4578.62 54.11 29.11 93.41 3364.36 51 4671.65 53.80 29.11 93.03 3419.10 52 4764.31 53.21 29.31 92.66 3474.21 53 4857.56 52.79 29.02 93.25 3530.33 54 4952.03 52.51 29.57 94.47 3587.65 55 5045.33 51.88 29.69 93.30 3644.84 56 5138.73 54.44 29.12 93.40 3700.83 57 5230.90 54.90 28.89 92.17 3754.13 58 5324.74 54.48 28.53 93.84 3808.37 59 5417.84 53.82 28.79 93.10 3862.90 60 5511.05 55.75 28.85 93.21 3916.64 Vertical Displ section +N/S- (ft) (ft) 1277.73 1278.33 1354.71 1355.13 1429.56 1429.83 1505.43 1505.55 1580.43 1580.39 1650.52 1650.33 1709.70 1709.19 1777.36 1775.88 1853.43 1849.88 1928.17 1921.46 2001.22 1990.49 2074.31 2059.01 2144.79 2124.75 2214.58 2189.66 2283.91 2254.17 2352.79 2318.33 2422.18 2382.61 2492.05 2446.85 2561.13 2510.41 2632.41 2576.20 2703.57 2641.92 2774.00 2706.93 2844.43 2771.96 2915.40 2837.46 2984.91 2901.54 3055.50 2966.6S 3126.68 3032.42 3199.30 3099.58 3270.88 3165.80 3343.94 3232.51 Displ Total +E/W- displ (ft) (f t) 110.70 1283.11 118.56 1360.31 126.07 1435.38 133.68 1511.48 141.27 1586.69 148.37 1656.99 155.41 1716.25 166.83 1783.70 185.15 1859.12 209.36 1932.83 238.25 2004.69 270.17 2076.66 302.78 2146.22 336.15 2215.32 369.11 2284.19 401.50 2352.84 436.06 2422.19 473.59 2492.26 510.46 2561.79 547.37 2633.71 583.96 2705.69 620.32 2777.10 656.61 2848.67 693.35 2920.94 729.80 2991.91 766.49 3064.07 802.95 3136.92 839.74 3211.32 875.93 3284.74 912.64 3358.87 At DLS Srvy Tool Azim (deg/ tool Corr (deg) 100f) type (deg) 4.95 2.68 BP_MWD+IFR+MS 5.00 0.50 BP_MWD+IFR+MS 5.04 0.47 BP_MWD+IFR+MS 5.07 0.29 BP_MWD+IFR+MS 5.11 0.12 BP MWD+IFR+MS 5.14 0.84 BP_MWD+IFR+MS 5.20 2.37 BP_MWD+IFR+MS 5.37 3.69 BP_MWD+IFR+MS 5.72 4.17 BP_MWD+IFR+MS 6.22 4.38 BP MWD+IFR+MS 6.83 2.94 BP_MWD+IFR+MS 7.48 1.30 BP_MWD+IFR+MS 8.11 2.63 BP_MWD+IFR+MS 8.73 0.30 BP_MWD+IFR+MS 9.30 0.36 BP MWD+IFR+MS 9.83 0.27 BP_MWD+IFR+MS 10.37 2.60 BP_MWD+IFR+MS 10.95 0.85 BP_MWD+IFR+MS 11.49 2.58 BP_MWD+IFR+MS 12.00 0.63 BP MWD+IFR+MS 12.46 0.33 BP_MWD+IFR+MS 12.91 0.66 BP_MWD+IFR+MS 13.33 0.51 BP_MWD+IFR+MS 13.73 0.55 BP_MWD+IFR+MS 14.12 0.68 BP MWD+IFR+MS 14.49 2.78 BP_MWD+IFR+MS 14.83 0.54 BP_MWD+IFR+MS 15.16 0.55 BP_MWD+IFR+MS 15.47 0.74 BP_MWD+IFR+MS 15.77 2.07 BP MWD+IFR+MS SCHLUMBERGER Survey Report Seq Measured Incl Azimuth Course TVD # depth angle angle length depth - (ft) (deg) (deg) (ft) (f t) 61 5603.61 57.96 28.05 92.56 3967 25 62 5697.17 60.88 28.88 93.56 4014.84 63 5791.86 63.76 30.59 94.69 4058.83 64 5884.27 66.66 32.01 92.41 4097.57 65 5977.84 70.06 33.79 93.57 4132.08 66 6071.32 73.16 35.09 93.48 4161.56 67 6164.43 75.10 34.05 93.11 4187.02 68 6257.98 76.40 29.96 93.55 4210.06 69 6351.55 74.80 26.84 93.57 4233.34 70 6391.00 74.14 24.56 39.45 4243.90 71 6403.00 76.00 24.05 12.00 4246.99 72 6441.59 77.30 28.23 38.59 4255.90 73 6473.04 77.00 31.60 31.45 4262.90 74 6503.72 78.29 34.87 30.68 4269.47 75 6534.86 79.65 38.17 31.14 4275.43 76 6565.80 80.90 41.43 30.94 4280.65 77 6596.65 82.38 43.97 30.85 4285.14 78 6626.01 84.02 47.86 29.36 4288.62 79 6658.76 83.99 50.19 32.75 4292.04 80 6690.20 85.84 54.67 31.44 4294.83 81 6721.16 88.51 56.21 30.96 4296.35 82 6754.50 90.56 61.54 33.34 4296.62 83 6784.89 91.09 65.13 30.39 4296.19 84 6816.01 93.50 69.04 31.12 4294.94 85 6847.02 94.12 73.25 31.01 4292.88 86 6878.57 93.84 76.34 31.55 4290.69 87 6909.28 93.36 80.09 30.71 4288.76 88 6940.63 93.62 84.48 31.35 4286.85 89 6972.25 91.90 87.56 31.62 4285.33 90 7003.60 90.35 90.35 31.35 4284.71 26-Nov-2005 20:23:06 Page 4 of 11 Vertical Displ Displ Total section +N/S- +E/W- displ (ft) (ft) (ft) (ft) 3416.64 3300.65 949.55 3434.52 3493.11 3371.45 987.94 3513.22 3572.12 3444.24 1029.54 3594.82 3650.38 3515.91 1073.13 3676.03 3730.59 3588.91 1120.38 3759.72 3811.46 3662.05 1170.54 3844.58 3893.04 3735.80 1221.36 3930.38 3977.20 3812.67 1269.39 4018.44 4063.28 3892.38 1312.50 4107.71 4099.91 3926.62 1328.98 4145.43 4111.15 3937.19 1333.75 4156.97 4147.25 3970.89 1350.29 4194.19 4176.11 3997.46 1365.58 4224.27 4203.68 4022.52 1382.01 4253.31 4231.07 4047.08 1400.19 4282.45 4257.58 4070.50 1419.71 4310.98 4283.32 4092.93 1440.41 4338.99 4306.98 4113.21 1461.35 4365.09 4332.36 4134.56 1485.94 4393.48 4355.54 4153.65 1510.75 4419.86 4377.31 4171.19 1536.21 4445.09 4399.31 4188.42 1564.74 4471.16 4417.54 4202.05 1591.89 4493.48 4434.52 4214.16 1620.53 4515.00 4449.55 4224.15 1649.80 4534.90 4463.05 4232.41 1680.17 4553.71 4474.52 4238.67 1710.17 4570.66 4484.14 4242.87 1741.17 4586.24 4491.88 4245.06 1772.67 4600.31 4497.99 4245.63 1804.00 4613.00 At DLS Srvy Tool Azim (deg/ tool Corr (deg) 100f) type (deg) 16.05 2.49 BP_MWD+IFR+MS 16.33 3.21 BP_MWD+IFR+MS 16.64 3.44 BP_MWD+IFR+MS 16.97 3.43 BP_MWD+IFR+MS 17.34 4.04 BP MWD+IFR+MS 17.73 3.57 BP_MWD+IFR+MS 18.10 2.34 BP_MWD+IFR+MS 18.41 4.46 BP_MWD+IFR+MS 18.63 3.65 BP_MWD+IFR+MS 18.70 5.81 BP BLIND 18.71 16.03 BP_BLIND 18.78 11.06 BP_INC+TREND 18.86 10.49 BP_INC+TREND 18.96 11.23 BP_INC+TREND 19.08 11.28 BP INC+TREND 19.23 11.14 BP_MWD+IFR+MS 19.39 9.45 BP_MWD+IFR+MS 19.56 14.29 BP_MWD+IFR+MS 19.77 7.08 BP_MWD+IFR+MS 19.99 15.36 BP MWD+IFR+MS 20.22 9.95 BP_MWD+IFR+MS 20.49 17.13 BP_MWD+IFR+MS 20.75 11.94 BP_MWD+IFR+MS 21.03 14.75 BP_MWD+IFR+MS 21.33 13.69 BP MWD+IFR+MS 21.65 9.81 BP_MWD+IFR+MS 21.97 12.29 BP_MWD+IFR+MS 22.31 14.00 BP_MWD+IFR+MS 22.66 11.15 BP_MWD+IFR+MS 23.02 10.18 BP MWD+IFR+MS • SCHLUMBERGER Survey Report 26-Nov-2005 20:23:06 Page 5 of 11 Seq Measured Incl Azimuth Course TVD # depth angle angle length depth - (ft) (deg) (deg) (ft) (ft) 91 7034.88 90.26 93.54 31.28 4284 54 92 7066.55 87.79 96.15 31.67 4285.08 93 7096.70 86.02 99.03 30.15 4286.71 94 7127.58 87.92 102.11 30.88. 4288.34 95 7158.47 87.43 106.15 30.89 4289.60 96 7188.98 89.08 110.10 30.51 4290.53 97 7219.81 89.44 113.53 30.83 4290.92 98 7250.52 90.07 116.15 30.71 4291.06 99 7281.39 88.83 120.31 30.87 4291.35 100 7311.46 90.04 122.98 30.07 4291.65 101 7342.40 89.38 126.14 30.94 4291.81 102 7372.29 89.39 129.24 29.89 4292.13 103 7402.68 89.57 133.33 30.39 4292.40 104 7433.74 91.63 137.57 31.06 4292.08 105 7464.65 91.47 141.05 30.91 4291.24 106 7495.11 91.81 143.74 30.46 4290.37 107 7525.73 93.19 143.36 30.62 4289.03 108 7556.34 92.54 143.68 30.61 4287.50 109 7587.06 90.25 142.15 30.72 4286.75 110 7617.53 89.10 140.31 30.47 4286.93 111 7648.28 88.70 140.43 30.75 4287.52 112 7678.92 89.11 141.15 30.64 4288.10 113 7709.50 87.50 141.64 30.58 4289.01 114 7740.50 88.03 140.91 31.00 4290.22 115 7771.33 88.03 141.06 30.83 4291.28 116 7801.82 87.93 141.79 30.49 4292.35 117 7833.27 88.86 143.20 31.45 4293.23 118 7863.79 88.20 141.07 30.52 4294.02 119 7895.66 87.21 141.96 31.87 4295.29 120 7925.67 89.19 142.22 30.01 4296.23 Vertical Displ Displ Total section +N/S- +E/W- displ (ft) (ft) (ft) (f t) 4502.48 4244.57 1835.26 4624.34 4505.44 4241.89 1866.81 4634.50 4506.81 4237.92 1896.65 4642.97 4506.61 4232.26 1926.95 4650.29 4504.49 4224.73 1956.88 4655.93 4500.29 4215.24 1985.86 4659.60 4494.08 4203.79 2014.47 4661.54 4486.32 4190.89 2042.34 4662.05 4476.77 4176.29 2069.53 4660.94 4465.78 4160.52 2095.12 4658.27 4453.02 4142.97 2120.60 4654.15 4439.22 4124.70 2144.25 4648.75 4423.54 4104.65 2167.08 4641.59 4405.62 4082.52 2188.86 4632.29 4386.13 4059.10 2209.00 4621.25 4365.68 4034.98 2227.58 4609.03 4344.68 4010.37 2245.75 4596.36 4323.71 3985.79 2263.93 4583.88 4302.88 3961.30 2282.45 4571.81 4282.88 3937.54 2301.53 4560.84 4263.04 3913.86 2321.14 4550.38 4243.11 3890.13 2340.50 4539.94 4222.98 3866.24 2359.57 4529.39 4202.63 3842.07 2378.95 4518.95 4182.50 3818.13 2398.35 4508.90 4162.42 3794.31 2417.35 4498.93 4141.26 3769.37 2436.49 4488.28 4120.88 3745.29 2455.21 4478.31 4099.$5 3720.36 2475.03 4468.43 4079.83 3696.70 2493.46 4459.02 At Azim (deg) 23.38 23.75 24.11 24.48 24.85 25.23 25.60 25.98 26.36 26.73 27.11 27.47 27.83 28.20 28.56 28.90 29.25 29.60 29.95 30.31 30.67 31.03 31.40 31.77 32.13 32.50 32.88 33.25 33.63 34.00 DLS Srvy Tool (deg/ tool Corr 100f) type (deg) 10.20 BP_MWD+IFR+MS 11.35 BP_MWD+IFR+MS 11.20 BP_MWD+IFR+MS 11.71 BP_MWD+IFR+MS 13.16 BP MWD+IFR+MS 14.02 BP_MWD+IFR+MS • 11.19 BP_MWD+IFR+MS 8.77 BP_MWD+IFR+MS 14.06 BP_MWD+IFR+MS 9.75 BP MWD+IFR+MS 10.43 BP_MWD+IFR+MS 10.37 BP_MWD+IFR+MS 13.47 BP_MWD+IFR+MS 15.18 BP_MWD+IFR+MS 11.27 BP MWD+IFR+MS 8.90 BP_MWD+IFR+MS 4.67 BP_MWD+IFR+MS 2.37 BP_MWD+IFR+MS 8.96 BP_MWD+IFR+MS 7.12 BP MWD+IFR+MS 1.36 BP_MWD+IFR+MS 2.70 BP_MWD+IFR+MS 5.50 BP_MWD+IFR+MS 2.91 BP_MWD+IFR+MS 0.49 BP MWD+IFR+MS 2.42 BP_MWD+IFR+MS 5.37 BP_MWD+IFR+MS 7.30 BP_MWD+IFR+MS 4.18 BP_MWD+IFR+MS 6.65 BP MWD+IFR+MS SCHLUMBERGER Survey Report 26-Nov-2005 20:23:06 Page 6 of 11 Seq Measured Incl Azimuth Course TVD # depth angle angle length depth - (f t) (deg) (deg) (ft) (ft) 121 7956.50 94.58 143.80 30.83 4295 22 122 7987.98 92.37 141.44 31.48 4293.31 123 8019.24 93.25 138.06 31.26 4291.78 124 8049.81 95.16 137.67 30.57 4289.54 125 8081.59 95.91 134.12 31.78 4286.47 126 8113.31 95.04 130.51 31.72 4283.44 127 8144.06 93.38 126.43 30.75 4281.19 128 8175.19 92.67 123.28 31.13 4279.54 129 8205.42 92.57 120.57 30.23 4278.16 130 8235.89 92.28 117.50 30.47 4276.87 131 8267.25 91.63 113.29 31.36 4275.80 132 8298.18 90.16 111.07 30.93 4275.32 133 8328.55 91.24 107.83 30.37 4274.95 134 8360.23 90.44 106.53 31.68 4274.48 135 8391.81 91.34 104.08 31.58 4273.99 136 8422.59 91.53 103.98 30.78 4273.22 137 8453.76 91.20 104.30 31.17 4272.48 138 8484.58 90.71 105.49 30.82 4271.96 139 8514.27 90.32 105.83 29.69 4271.70 140 8545.34 90.13 104.84 31.07 4271.58 141 8577.34 90.71 103.36 32.00 4271.34 142 8608.21 90.51 101.44 30.87 4271.01 143 8639.31 90.33 100.70 31.10 4270.78 144 8670.82 90.13 100.99 31.51 4270.66 145 8701.83 89.88 101.64 31.01 4270.65 146 8732.84 89.92 100.93 31.01 4270.71 147 8763.33 89.99 100.82 30.49 4270.73 148 8794.56 90.76 100.22 31.23 4270.53 149 8826.08 91.34 98.98 31.52 4269.95 150 8855.85 91.14 99.57 29.77 4269.31 Vertical Displ Displ Total section +N/S- +E/W- displ (ft) (ft) (ft) (ft) 4058.90 3672.10 2511.99 4449.09 4037.70 3647.13 2531.07 4439.35 4017.82 3623.30 2551.24 4431.38 3999.20 3600.70 2571.69 4424.77 3980.74 3577.99 2593.70 4419.19 3963.96 3556.73 2617.04 4415.80 3949.44 3537.66 2641.05 4414.77 3936.47 3519.90 2666.56 4415.90 3925.30 3503.93 2692.18 4418.75 3915.47 3489.16 2718.80 4423.36 3907.26 3475.72 2747.10 4430.26 3900.84 3464.05 2775.74 4438.96 3895.96 3453.93 2804.37 4449.06 3892.11 3444.58 2834.63 4460.97 3889.30 3436.24 2865.09 4473.98 3887.24 3428.78 2894.94 4487.45 3885.10 3421.17 2925.15 4501.22 3882.58 3413.25 2954.93 4514.63 3879.76 3405.24 2983.52 4527.37 3876.97 3397.02 3013.48 4541.02 3874.80 3389.23 3044.52 4555.87 3873.61 3382.60 3074.67 4571.16 3873.14 3376.63 3105.19 4587.35 3$72.79 3370.70 3136.13 4604.01 3872.18 3364.61 3166.54 4620.35 38.71.60 3358.55 3196.95 4636.84 3871.24 3352.79 3226.89 4653.39 3871.06 3347.09 3257.60 4670.65 3871.39 3341.84 3288.67 4688.63 3871.87 3337.04 3318.04 4705.87 At Azim (deg) 34.38 34.76 35.15 35.54 35.94 36.35 36.74 37.15 37.54 37.93 38.32 38.71 39.07 39.45 39.82 40.17 40.53 40.88 41.22 41.58 41.93 42.27 42.60 42.94 43.26 43.59 43.90 44.22 44.54 44.84 DLS Srvy Tool (deg/ tool Corr 100f) type {deg) 18.22 BP_MWD+IFR+MS 10.26 BP_MWD+IFR+MS 11.16 BP_MWD+IFR+MS 6.38 BP_MWD+IFR+MS 11.37 BP MWD+IFR+MS 11.66 BP_MWD+IFR+MS 14.29 BP_MWD+IFR+MS 10.36 BP_MWD+IFR+MS 8.96 BP_MWD+IFR+MS 10.11 BP MWD+IFR+MS 13.58 BP_MWD+IFR+MS 8.61 BP_MWD+IFR+MS 11.24 BP_MWD+IFR+MS 4.82 BP_MWD+IFR+MS 8.26 BP MWD+IFR+MS 0.70 BP_MWD+IFR+MS 1.47 BP_MWD+IFR+MS 4.18 BP MWD+IFR+MS 1.74 BP_MWD+IFR+MS 3.24 BP MWD+IFR+MS 4.97 BP_MWD+IFR+MS • 6.25 BP_MWD+IFR+MS 2.45 BP_MWD+IFR+MS 1.12 BP_MWD+IFR+MS 2.25 BP MWD+IFR+MS 2.29 BP_MWD+IFR+MS 0.43 BP_MWD+IFR+MS 3.13 BP_MWD+IFR+MS 4.34 BP_MWD+IFR+MS 2.09 BP MWD+IFR+MS SCHLUMBERGER Survey Report 26-Nov-2005 20:23:06 Page 7 of 11 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 151 8887.67 90.83 99.44 31.82 152 8919.29 89.53 96.90 31.62 153 8950.16 87.76 97.42 30.87 154 8981.32 88.13 97.46 31.16 155 9012.69 87.87 98.29 31.37 156 9042.96 87.40 98.23 30.27 157 9074.12 89.25 99.22 31.16 158 9104.09 90.24 99.65 29.97 159 9134.96 90.30 99.33 30.87 160 9165.84 90.30 99.87 30.88 161 9197.27 90.63 99.55 31.43 162 9228.51 87.43 97.00 31.24 163 9259.44 86.51 97.84 30.93 164 9290.34 86.65 97.99 30.90 165 9321.74 87.97 99.05 31.40 166 9352.11 89.39 98.56 30.37 167 9382.87 88.93 98.18 30.76 168 9414.35 90.29 98.99 31.48 169 9445.16 89.71 98.79 30.81 170 9476.90 89.80 98.08 31.74 171 9508.23 85.93 96.31 31.33 172 9539.61 88.61 96.95 31.38 173 9570.90 86.94 94.30 31.29 174 9602.34 88.15 94.19 31.44 175 9633.41 88.07 95.48 31.07 176 9665.16 90.53 96.29 31.75 177 9695.88 91.39 100.25 30.72 178 9725.71 91.94 103.15 29.83 179 9756.82 91.19 106.81 31.11 180 9788.46 90.39 111.42 31.64 TVD depth (ft) 4268.76 4268.66 4269.39 4270.51 4271.60 4272.85 4273.76 4273.90 4273.75 4273.59 4273.33 4273.86 4275.50 4277.34 4278.81 4279.51 4279.96 4280.18 4280.18 4280.31 4281.48 4282.98 4284.19 4285.54 4286.56 4286.95 4286.44 4285.57 4284.72 4284.28 Vertical Displ Displ Total section +N/S- +E/W- displ (ft) (ft) (ft) (f t) ------------ ------ 3872.26 3331.78 3349.42 4724.34 3873.38 3327.29 3380.72 4743.43 3875.02 3323.45 3411.34 4762.62 3876.52 3319.41 3442.21 4781.98 3877.79 3315.12 3473.27 4801.42 3878.81 3310.77 3503.20 4820.13 3879.61 3306.05 3533.98 4839.32 3880.01 3301.14 3563.55 4857.61 3880.40 3296.05 3593.99 4876.55 3880.72 3290.90 3624.44 4895.57 3880.99 3285.59 3655.42 4915.00 3882.04 3281.10 3686.32 4935.04 3883.53 3277.11 3716.95 4955.32 3884.76 3272.86 3747.50 4975.48 3885.68 3268.22 3778.52 4995.85 3886.42 3263.57 3808.52 5015.55 3887.40 3259.09 3838.95 5035.80 3888.29 3254.39 3870.08 5056.54 3889.00 3249.63 3900.52 5076.83 3889.97 3244.98 3931.92 5098.02 3891.61 3241.06 3962.97 5119.53 3893.57 3237.44 3994.10 5141.39 3896.06 3234.37 4025.21 5163.67 3899.32 3232.05 4056.54 5186.68 3902.22 3229.43 4087.48 5209.29 3904.61 3226.17 4119.06 5232.10 3905.64 3221.76 4149.45 5253.34 3904.86 3215.71 4178.64 5272.75 3902.27 3207.67 4208.68 5291.71 3897.37 3197.32 4238.56 5309.26 At DLS Srvy Tool Azim (deg/ tool Corr (deg) 100f) type (deg) ------- ----- ----- ------ 45.15 1.06 BP_MWD+IFR+MS 45.46 9.02 BP_MWD+IFR+MS 45.75 5.98 BP_MWD+IFR+MS 46.04 1.19 BP_MWD+IFR+MS 46.33 2.77 BP MWD+IFR+MS 46.62 1.57 BP-MWD+IFR+MS 46.91 6.73 BP MWD+IFR+MS 47.19 3.60 BP_MWD+IFR+MS 47.48 1.05 BP_MWD+IFR+MS 47.76 1.75 BP MWD+IFR+MS 48.05 1.46 BP_MWD+IFR+MS 48.33 13.10 BP_MWD+IFR+MS 48.60 4.03 BP_MWD+IFR+MS 48.87 0.66 BP_MWD+IFR+MS 49.14 5.39 BP MWD+IFR+MS 49.41 4.95 BP_MWD+IFR+MS 49.67 1.94 BP_MWD+IFR+MS 49.94 5.03 BP_MWD+IFR+MS 50.20 1.99 BP_MWD+IFR+MS 50.47 2.25 BP MWD+IFR+MS 50.72 13.58 BP_MWD+IFR+MS • 50.97 8.78 BP_MWD+IFR+MS 51.22 10.00 BP_MWD+IFR+MS 51.45 3.86 BP_MWD+IFR+MS 51.69 4.16 BP MWD+IFR+MS 51.93 8.16 BP_MWD+IFR+MS 52.17 13.19 BP_MWD+IFR+MS 52.42 9.89 BP_MWD+IFR+MS 52.69 12.00 BP_MWD+IFR+MS 52.97 14.79 BP MWD+IFR+MS SCHLUMBERGER Survey Report 26-Nov-2005 20:23:06 Page 8 of 11 Seq Measured Incl Azimuth Course TVD # depth angle angle length depth - (ft) (deg) (deg) (f t) (f t) 181 9818.60 90.62 114.74 30.14 4284 02 182 9850.42 90.49 118.55 31.82 4283.71 183 9881.19 89.97 121.99 30.77 4283.59 184 .9912.12 89.91 126.78 30.93 4283.62 185 9942.77 90.39 128.22 30.65 4283.54 186 9975.20 90.52 129.14 32.43 4283.28 187 10005.98 89.53 128.54 30.78 4283.27 188 10037.30 89.55 127.82 31.32 4283.52 189 10067.97 90.27 127.11 30.67 4283.57 190 10098.43 90.49 129.97 30.46 4283.36 191 10130.64 90.92 130.70 32.21 4282.97 192 10161.36 89.95 127.83 30.72 4282.73 193 10191.73 88.56 127.19 30.37 4283.13 194 10223.56 89.11 128.02 31.83 4283.78 195 10254.53 91.52 127.02 30.97 4283.61 196 10285.34 89.63 124.44 30.81 4283.30 197 10316.58 87.43 124.13 31.24 4284.10 198 10347.86 87.09 123.73 31.28 4285.59 199 10379.22 87.92 123.31 31.36 4286.96 200 10410.11 87.67 126.67 30.89 4288.15 201 10441.58 90.17 127.25 31.47 4288.74 202 10472.36 90.51 129.31 30.78 4288.56 203 10503.80 88.63 126.82 31.44 4288.79 204 10534.32 87.18 127.89 30.52 4289.91 205 10565.52 86.67 127.21 31.20 4291.58 206 10596.88 88.21 130.30 31.36 4292.98 207 10628.50 89.03 130.36 31.62 4293.75 208 10659.12 88.38 128.98 30.62 4294.44 209 10689.99 87.73 128.82 30.87 4295.49 210 10720.90 88.97 125.70 30.91 4296.38 Vertical Displ Displ Total section +N/S- +E/W- displ (ft) (ft) (f t) (f t) 3890.65 3185.50 4266.28 5324.34 3881.65 3171.24 4294.72 5338.67 3871.09 3155.73 4321.29 5350.90 3858.42 3138.27 4346.81 5361.29 3844.37 3119.61 4371.12 5370.17 3828.90 3099.34 4396.44 5379.09 3814.15 3080.04 4420.41 5387.64 3799.45 3060.68 4445.03 5396.86 3785.41 3042.02 4469.37 5406.40 3770.95 3023.05 4493.20 5415.50 3754.78 3002.20 4517.75 5424.32 3739.86 2982.76 4541.53 5433.45 3725.92 2964.27 4565.62 5443.51 3711.28 2944.85 4590.83 5454.16 3697.06 2925.99 4615.39 5464.73 3683.79 2908.00 4640.39 5476.29 3671.04 2890.41 4666.20 5488.89 3658.47 2872.97 4692.12 5501.81 3646.07 2855.67 4718.24 5515.13 3633.13 2837.97 4743.52 5527.67 3618.96 2819.06 4768.66 5539.61 3604.47 2799.99 4792.82 5550.78 3589.78 2780.61 4817.57 5562.45 3575.86 2762.10 4841.82 5574.26 3561.55 2743.12 4866.52 5586.38 3546.58 2723.51 4890.94 5598.11 3530.71 2703.05 4915.04 5609.29 3515.65 2683.51 4938.60 5620.59 3500.83 2664.14 4962.61 5632.51 3486.78 2645.43 4987.20 5645.40 At DLS Srvy Tool Azim (deg/ tool Corr {deg) 100f) type (deg) 53.25 11.04 BP_MWD+IFR+MS 53.56 11.98 BP_MWD+IFR+MS 53.86 11.31 BP_MWD+IFR+MS 54.17 15.49 BP_MWD+IFR+MS 54.49 4.95 BP MWD+IFR+MS 54.82 2.86 BP_MWD+IFR+MS 55.13 3.76 BP_MWD+IFR+MS 55.45 2.30 BP_MWD+IFR+MS 55.76 3.30 BP_MWD+IFR+MS 56.07 9.42 BP MWD+IFR+MS 56.39 2.63 BP_MWD+IFR+MS 56.70 9.86 BP_MWD+IFR+MS 57.01 5.04 BP_MWD+IFR+MS 57.32 3.13 BP_MWD+IFR+MS 57.63 8.42 BP MWD+IFR+MS 57.93 10.38 BP_MWD+IFR+MS 58.22 7.11 BP_MWD+IFR+MS 58.52 1.68 BP_MWD+IFR+MS 58.82 2.97 BP MWD+IFR+MS 59.11 10.90 BP MWD+IFR+MS 59.41 8.16 BP_MWD+IFR+MS • 59.71 6.78 BP_MWD+IFR+MS 60.01 9.92 BP_MWD+IFR+MS 60.30 5.90 BP_MWD+IFR+MS 60.59 2.72 BP MWD+IFR+MS 60.89 11.00 BP_MWD+IFR+MS 61.19 2.60 BP MWD+IFR+MS - ___.. _ 61.48 4.98 BP_MWD+IFR+MS 61.77 2.17 BP_MWD+IFR+MS 62.06 10.86 BP MWD+IFR+MS SCHLUMBERGER Survey Report 26-Nov-2005 20:23:06 Page 9 of 11 Seq Measured Incl Azimuth Course TVD # depth angle angle length depth - (ft) (deg) (deg) (f t) (ft) 211 10751.50 87.63 122.22 30.60 4297 28 212 10782.56 88.72 119.70 31.06 4298.27 213 10813.82 89.01 116.94 31.26 4298.89 214 10844.57 88.88 113.81 30.75 4299.46 215 10876.13 89.19 110.86 31.56 4299.99 216 10906.78 88.04 107.23 30.65 4300.73 217 10938.75 88.53 107.54 31.97 4301.69 218 10969.47 88.91 106.91 30.72 4302.38 219 11001.18 89.12 107.86 31.71 4302.92 220 11032.17 88.39 107.26 30.99 4303.59 221 11063.25 87.34 105.17 31.08 4304.75 222 11094.17 86.72 107.36 30.92 4306.35 223 11125.39 89.58 109.47 31.22 4307.36 224 11156.29 90.43 108.84 30.90 4307.36 225 11186.39 90.19 109.04 30.10 4307.20 226 11217.96 90.12 110.23 31.57 4307.11 227 11249.38 89.75 110.34 31.42 4307.15 228 11280.61 87.60 109.49 31.23 4307.87 229 11311.19 87.58 110.02 30.58 4309.15 230 11341.99 87.87 108.37 30.80 4310.38 231 11373.66 88.93 106.24 31.67 4311.26 232 11404.36 89.34 105.58 30.70 4311.72 233 11435.67 88.10 104.70 31.31 4312.42 234 11467.33 87.97 105.30 31.66 4313.51 235 11498.73 86.45 104.00 31.40 4315.04 236 11529.78 85.90 102.32 31.05 4317.11 237 11561.24 85.33 102.03 31.46 4319.51 238 11592.27 86.73 101.77 31.03 4321.66 239 11622,90 88.99 100.51 30.63 4322.81 240 11654.35 89.04 99.34 31.45 4323.35 Vertical Displ Displ Total section +N/S- +E/W- displ (ft) (ft) (f t) (ft) 3474.46 2628.35 5012..57 5659.86 3463.46 2612.38 5039.18 5676.08 3453.74 2597.55 5066.70 5693.74 3445.69 2584.38 5094.47 5712.50 3439.06 2572.39 5123.65 5733.15 3434.35 2562.39 5152.61 5754.59 3430.35 2552.85 5183.11 5777.69 3426.59 2543.75 5212.44 5800.02 3422.63 2534.28 5242.70 5823.10 3418.66 2524.93 5272.24 5845.66 3415.40 2516.26 5302.06 5868.85 3412.14 2507.61 5331.70 5891.96 3407.68 2497.75 5361.30 5914.59 3402.87 2487.62 5390.49 5936.80 3398.30 2477.85 5418.96 5958.59 3393.13 2467.24 5448.69 5981.26 3387.62 2456.34 5478.17 6003.66 3382.35 2445.71 5507.52 6026.13 3377.28 2435.38 5536.27 6048.26 3372.47 2425.27 5565.34 6070.82 3368.56 2415.85 5595.56 6094.80 3365.50 2407.43 5625.08 6118.60 3362.81 2399.26 5655.29 6143.19 3360.16 2391.07 5685.86 6168.16 3357.73 2383.14 5716.20 6193.08 3356.13 2376.08 5746.37 6218.24 3355.04 2369.47 5777.03 6244.07 3354.13 2363.09 5807.32 6269.70 3353.62 2357.17 5837.35 6295.31 3353.78 2351.75 5868.32 6322.02 At Azim (deg) 62.33 62.60 62.86 63.10 63.34 63.56 63.78 63.99 64.20 64.41 64.61 64.81 65.02 65.23 65.43 65.64 65.85 66.06 66.26 66.45. 66.65 66.83 67.01 67.19 67.37 67.54 67.70 67.86 68.01 68.16 DLS Srvy Tool (deg/ tool Corr 100f) type (deg) 12.18 BP_MWD+IFR+MS 8.84 BP_MWD+IFR+MS 8.88 BP_MWD+IFR+MS 10.19 BP_MWD+IFR+MS 9.40 BP MWD+IFR+MS 12.42 BP_MWD+IFR+MS . 1.81 BP_MWD+IFR+MS 2.39 BP_MWD+IFR+MS 3.07 BP_MWD+IFR+MS 3.05 BP MWD+IFR+MS 7.52 BP_MWD+IFR+MS 7.35 BP_MWD+IFR+MS 11.38 BP_MWD+IFR+MS 3.42 BP_MWD+IFR+MS 1.04 BP MWD+IFR+MS 3.78 BP_MWD+IFR+MS 1.23 BP_MWD+IFR+MS 7.40 BP_MWD+IFR+MS 1.73 BP_MWD+IFR+MS 5.44 BP MWD+IFR+MS 7.51 BP_MWD+IFR+MS • 2.53 BP_MWD+IFR+MS 4.86 BP_MWD+IFR+MS 1.94 BP MWD+IFR+MS 6.37 BP MWD+IFR+MS 5.68 BP_MWD+IFR+MS 2.03 BP_MWD+IFR+MS 4.59 BP_MWD+IFR+MS 8.45 BP_MWD+IFR+MS 3.72 BP MWD+IFR+MS SCHLUMBERGER Survey Report 26-Nov-2005 20:23:06 Page 10 of 11 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (f t) 241 11685.31 89.07 100.48 30.96 242 11716.49 89.14 101.84 31.18 243 11748.00 88.24 101.50 31.51 244 11778.63 88.04 102.45 30.63 245 11809.89 89.71 102.54 31.26 246 11840.30 87.72 101.04 30.41 247 11870.88 85.79 98.39 30.58 248 11902.71 86.63 98.85 31.83 249 11933.19 86.85 98.75 30.48 250 11964.33 86.80 99.17 31.14 251 11995.89 86.76 99.33 31.56 252 12027.43 86.00 99.08 31.54 253 12059.10 85.47 99.65 31.67 254 12089.97 87.91 101.46 30.87 255 12121.18 88.12 102.49 31.21 256 12152.99 86.58 102.45 31.81 257 12184.02 86.22 103.15 31.03 258 12215.43 85.14 103.79 31.41 259 12246.38 87.54 105.17 30.95 260 12276.83 89.04 106.79 30.45 261 12308.19 87.16 107.38 31.36 262 12338.69 87.40 106.47 30.50 263 12369.42 87.52 106.95 30.73 264 12400.73 87.86 106.47 31.31 265 12430.88 86.98 108.22 30.15 266 12462.73 87.73 109.25 31.85 267 12494.91 86.79 108.54 32.18 268 12524.96 86.30 108.80 30.05 269 12557.37 85.39 108.27 32.41 270 12587.77 84.63 109.21 30.40 TVD depth (ft) 4323.86 4324.34 4325.06 4326.06 4326.67 4327.35 4329.09 4331.19 4332.92 4334.65 4336.42 4338.41 4340.77 4342.55 4343.63 4345.10 4347.05 4349.42 4351.39 4352.30 4353.34 4354.79 4356.15 4357.41 4358.77 4360.24 4361.78 4363.59 4365.94 4368.58 Vertical Displ Displ Total section +N/S- +E/W- displ (ft) (f t) (ft) (ft) 3353.93 2346.43 5898.81 6348.36 3353.41 2340.39 5929.40 6374.58 3352.60 2334.02 5960.25 6400.96 3351.65 2327.67 5990.20 6426.55 3350.40 2320.91 6020.71 6452.56 3349.56 2314.69 6050.47 6478.12 3349.82 2309.54 6080.56 6504.40 3350.69 2304.78 6111.96 6532.08 3351.43 2300.13 6142.03 6558.59 3352.11 2295.28 6172.74 6585.67 3352.63 2290.22 6203.84 6613.08 3353.18 2285.18 6234.92 6640.50 3353.64 2280.05 6266.08 6668.01 3353.45 2274.40 6296.37 6694.56 3352.48 2267.93 6326.88 6721.08 3351.22 2261.07 6357.91 6747.99 3349.82 2254.21 6388.11 6774.17 3348.03 2246.91 6418.56 6800.48 3345.72 2239.19 6448.47 6826.18 3342.66 2230.81 6477.73 6851.09 3338.90 2221.60 6507.69 6876.44 3335.33 2212.73 6536.83 6901.18 3331.85 2203.91 6566.23 6926.23 3328.31 2194.91 6596.20 6951.79 3324.56 2185.93 6624.95 6976.26 3319.84 2175.71 6655.08 7001.70 3314.98 2165.30 6685.49 7027.39 3310.56 2155.70 6713.90 7051.49 3305.88 2145.43 6744.55 7077.56 3301.38 2135.70 6773.23 7101.96 At DLS Srvy Tool Azim (deg/ tool Corr (deg) 100f) type (deg) 68.31 3.68 BP_MWD+IFR+MS 68.46 4.37 BP_MWD+IFR+MS 68.61 3.05 BP_MWD+IFR+MS 68.76 3.17 BP_MWD+IFR+MS 68.92 5.35 BP MWD+IFR+MS 69.06 8.19 BP_MWD+IFR+MS • 69.20 10.71 BP_MWD+IFR+MS 69.34 3.01 BP_MWD+IFR+MS 69.47 0.79 BP_MWD+IFR+MS 69.60 1.36 BP MWD+IFR+MS 69.74 0.52 BP_MWD+IFR+MS 69.87 2.54 BP_MWD+IFR+MS 70.01 2.45 BP_MWD+IFR+MS 70.14 9.84 BP_MWD+IFR+MS 70.28 3.37 BP MWD+IFR+MS 70.42 4.84 BP_MWD+IFR+MS 70.56 2.53 BP_MWD+IFR+MS 70.71 3.99 BP_MWD+IFR+MS 70.85 8.94 BP_MWD+IFR+MS 71.00 7.25 BP MWD+IFR+MS 71.15 6.28 BP_MWD+IFR+MS • 71.30 3.08 BP_MWD+IFR+MS 71.45 1.61 BP_MWD+IFR+MS 71.59 1.88 BP_MWD+IFR+MS 71.74 6.49 BP MWD+IFR+MS 71.90 4.00 BP_MWD+IFR+MS 72.05 3.66 BP_MWD+IFR+MS 72.20 1.85 BP_MWD+IFR+MS 72.35 3.25 BP_MWD+IFR+MS 72.50 3.97 BP MWD+IFR+MS SCHLUMBERGER Survey Report 26-Nov-2005 20sy;23:06 Page 11 of 11 Seq Measured Incl --- Azimuth ------ Course -------- TVD -------- Vertical =====p== Dis 1 ======p= Dis 1 _________ Total ______ At _____ DLS _____ ______ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (f t) (f t} (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 271 12635.00 84.63 109.21 47.23 4373.00 3294.01 2120.22 6817.63 7139.71 72.72 0.00 Projection to TD [(c)2005 IDEAL ID10 2C O1} f~ C, ~ • Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Helen Warman Well No L-250L2 Date Dispatched: 0-Jan-00 Installation/Rig Nabors-9ES Dispatched By: Mauricio Perdomo LWD Log Delivery V1.1, 10-02-03 Data No Of Prints No of Flo ies Surveys 2 _ 1 .,._, Received By: Please sign and return tq: Drilling & Measurements LWD Division ~ 2525 Gambell Street, Suite 400 / ~ ~ ~ ~ [/ Anchorage, Alaska 99501 nrose1 @slb.com Fax: 907-561-8367 _ °~ ~ ~ , ~ ,~ ~; ri ~ ~ ~ -- ~, ,~ 3 ~. ~ ~ z ~ ~ ~ ~ ~ _jr ~ -`~ I ~ ~~ i a J ~ -~ r; ~ i ~ ~ ~ I ~ ~~ " 1~9 ~ a ; 3 1 ) ~ ~ a b r ~ _ , ALASSA OIL A1~TD GAS COI~TSERQATIOI~T CO1~II-II5SIO~T Robert Tirpack Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 FRANK H. MURKOWSKI, GOVERNOR 333 W. T" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: PBU L-250L2 BP Exploration (Alaska} Inc. Permit No: 205-154 Surface Location: 2564' FSL, 3719' FEL, SEC. 34, T12N, Rl lE, UM Bottomhole Location: 4672' FSL, 3289' FWL, SEC. 35, T12N, Rl lE, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. ' '" "°~ ""- Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty- four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659- 3607 (pager). DATED this ~i day of October, 2005 cc: Department of Fish 8v Game, Habitat Section wJo encl. Department of Environmental Conservation w/a encl. STATE OF ALASKA ALAS OIL AND GAS CONSERVATION C VIMISSIOf~ PERMIT TO DRILL 20 aac 2.005 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current W ell Class ^ Exploratory ®Development Oil ~J ^ Stratigraphic Test ^ Service ^Development Gas ~'] ,{VR~one 's ~bne 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU L-250L2 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12548 T~/p 4363 12. Field / Pools}: Prudhoe Bay Field / Orion 4a. Location of Well (Governmental Section): Surface: 2564' FSL 3719' FEL SEC. 34 T12N R11 E UM (As Staked) 7. Property Designation: ADL 028238 Schrader Bluff , , , , , Top of Productive Horizon: 826' FSL, 1228' FEL, SEC. 27, T12N, R11E, UM 8. Land Use Permit: 13. Approximate Spud Date: October 20, 2005 Total Depth: 4672' FSL, 3289' FWL, SEC. 35, T12N, R11E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 4430' 4b. Location of Wel! (State Base Plane Coordinates): Surface: x-583195 Y-5978286 Zone-ASP4 10. KB Elevation (Height above GL):Plan 77.2 feet 15. Distance to Nearest well within Pool 350'to L-118 16. Deviated Wells: Kickoff Depth: 6238 feet Maximum Hole Angle: 96 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 1884 Surface: 1468 1 asing rogram: .Size Specfications Settin De th g p To Bottom Quantity of Cement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 6-314" 4" x 4.8" 15.5# ! 10.9 L-80 IBT 6322' 6226' 4214' 12548' 4363' Uncemented Excluder Screens 19. PRESENT WELL CONDITION SUMM ARY (To be completed for Redrill AND Re-entry Operations) Total Depth MD (ft): 9670 Total Depth TVD (ft}: 4428 Plugs (measured): None Effective Depth MD (ft): 9670 Effective Depth TVD (ft): 4428 Junk (measured): None Casing Length Size Cement Volume MD TVD t on u t r 80' 20"x34" 260 sx Arctic Set A rox. 109' 109' 3191' 10-3/4" 585 sx AS Lite, 441 sx Class 'G' 3220' 2545' r ' t 6695' 7-5/8" 600 sx Class 'G' 6724' 4305' Prod ti n 2970' 4-1/2" Uncemented Slotted Liner 6700' - 9670' 4301' - 4427' Liner L1 4979' 4" x 4.8" Uncemented Excluder Screens 6636' - 11615' 4289' - 4343' Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ^ Property Plat ^ Diverter Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Michael Triolo, 564-5774 Printed Name Robert Tirpack Title Senior Drilling Engineer Prepared By Name/Number: Si nature ~~~s~-.~~ ~- Phone 564-4166 Date 0~ is~ Terrie Hubble, 564-4628 Commission Use Only Permit To Drill Number: API Number: 50- Qz- ~ Z..3Z. ~/-" ,6 f Permit Approval Date: ,,~ , ~,i - See cover letter for other requirements Conditions of Approval: Samples Required _ Hydr Sulfide Measures Other: ~ ~~:.'~" fr' ~ ~~Q t~ ~ S,ti , A roved ^ Yes ~No Mud Log Required ^ Yes `~~No ^ Yes ~'No Directional Survey Required ~les ^ No APPROVED BY !0 THE COMM SION Date ~~~~~~~~ OCT 1 ~ 2005 ns. C ft~tission Form 10-401 Ttevised 01;l2604 ~ t ~~ Ik;~ ~f /~ ~._~ J / -) / Submit ~ Duplicate ~ U `j7b ` f ( /(( Gre Prudhoe Ba L-250 ML Permit Well Plan Summary Weft Name: L-250, L-250 L1 & L-250 L2 T e of Well roducer or in'ector : Schrader OA and Nb Multilateral Producer Surface Location: AS-stake 2,564' FSL, 3,719' FEL, Sec. 34, T12N, R11 E X = 583,194.82 Y = 5,978,285.78 L-250 OA Target Start: 733' FSL, 2,664' FEL, Sec. 27, T12N, R11 E X = 584,600 Y = 5,982,970 Z = 4,305' TVDss L-250 OA Target End: 4,434 FSL, 2,421' FEL, Sec. 27, T12N, R11 E X = 584,400 Y = 5,985.450 Z = 4,350' TVDss L-250 L1 Nb Target Start: 733' FSL, 2,664' FEL, Sec. 27, T12N, R11 E X = 584,380 Y = 5,983,500 Z = 4,200' TVDss L-250 L1 Nb Target End: 1,071' FSL, 2,566' FEL, Sec. 22, T12N, R11 E X = 584,230 Y = 5,987,365 Z = 4,265' TVDss L-250 L2 Nb Target Start: 826' FSL, 1,228' FEL, Sec. 27, T12N, Ri1E X = 585,640 Y = 5,981,855 Z = 4,195' TVDss L-250 L2 Nb Target End: 4,672' FSL, 1,991' FEL, Sec. 35, T12N, R11 E X = 590,175 Y = 5,980,475 Z = 4,285' TVDss AFE Number: ORD5M3596 KBE = 77.20' Ri Nabors 9ES Estimated Start Date: October 20 2005 O eratin da s to com lete: 32.11 OA MD 9,670' Nb-L1 MD 11,615' Nb-L2 MD 12,548' Well TVDrkb: TD 4,428' Well TVDrkb: TD 4,343' Well TVDrkb: TD 4,363' Max Inc. 91 ° Max Inc. 97° Max Inc. 96° KOP 500' KOP 6,648' KOP 6,238' Current Well Information Distance to Nearest Property: Distance to Nearest Well in Pool L-250 Original Well API #: L-250 L1 API Nb #: L-250 L2 API Nb #: Well Type: Current Status: H2S: BHT: BHP: Mechanical Condition L-250 Conductor: Base Flange height: Nabor 9ES: Materia{s Needed L-250: 2,555' to unit boundary in OA, L-250 L1: 2,445' to unit boundary in Nb, L-250 L2: 4,430' to unit boundary in Nb. L-250: 350' to L-118 at Top Na 50-029-xxxxx-00 50-029-xxxxx-60 50-029-xxxxx-61 Schrader O/N-sand Trilateral Producer New well, conductor is set 0 ppm from produced fluids (approximated to be around 10 ppm due to contaminated gas lift gas) 82 °F ~ 4,100' TVDss (Estimated) 8.6 - 8.7 ppg in Schrader N/O-Sands (Based on MDT's taken on L-216 in May `04) 20" X 34", 215.5 Ib/ft, A53 ERW set at 109' RKB Above MSL = 48.70' KB = 28.50 Permit 10!10!05 _ ~. Gr~ Prudhoe Bay L-250 ML Permit Materials Needed . 'Surface Casin Amount Descri ``tion _ , , 3,220' 10-3/a", 45.5#, L-80, BTC Casing (Burst: 5,210; Collapse: 2,470) 1 each 10-3/a", BTC Float Shoe and Float Collar 25 each 10-3/a" x 13-'/z" Bow Spring Centralizers 1 assembly FMC 11" 5m Gen 5 Wellhead System 1 lot 10-3/a" casing pups 5', 10', 20'. 1 each 10-3/a" TAM Port Collar Intermediate Casin Amount. ~ ~ - Descri tion 6,725' 7-8/e" 29.7# L-80 BTC-M Casing (Burst: 6,890; Collapse: 4,790) 1 each 7-6/" BTC-M Float Shoe and Float Collar 95 each 7-6/e" x 9-'/e" Rigid Straight Blade Centralizers 50 each 7-$/" Stop Rings 2 lots 7-6/a" casing pups 5', 10', 20' 4 each 7-b/8" RA Tag Production: Liner: - :Amount ~- Descri tion 3 x Production Liners: 3,300' 4'/z", 12.6#, L-80, IBT-Mod Slotted Liner See Note below 5,651' 4.8" x 4", 15.5# Baker Excluder 2000 Screen (Medium mesh) See Note below 5,651' 4", 10.9#, L-80 IBT-M solid liner 75 each 4'/i" x 5 3/a" x 8" Straight Blade Centralizers 3 each 7-S/a" x 4-'h" Baker ZXP Liner Top Packer 1 each 4-'h" Halfiburton Float Shoes 2 each 4" Halfiburton Float Shoes 5 each 6.4" x 15' EWS Swell Packer (Packer OD may be 6.3") 150 each 4" x 5 3/a" x 8" Straight Blade Centralizers 2 assemblies Baker Level 3 Hookwall Hangers with LEM 1 each Halfiburton Glass / com osite shear out lu 3.958" ID after shear rvV 1 C: i ne oase plan is to utuize SuibU screen blank. I his may change based on the as-drilled profile and log interpretations. Have extra pipe on location and in inventory to accommodate. Com letion: Amount Descri tion 6,200' 4-'/z", 12.75 Ib/ft, L-80, TCII tubing 1 each Baker PRM Production Packer 7 5/s" X 4-'/z" 1 each 11" X 4-'/z" FMC tubing hanger 1 each 4-'i,s", 5m Cameron Tree 2 each Halfiburton X-Nipple (3.813" ID) 1 each 4-'/z" Baker CMD Sliding Sleeve 4 each Camco 4-'/z" X 1" KBG-2 Gas Lift Mandrels 2 each Phoenix pressure gauge 6,200' Encapsulated I-wire for the Phoenix gauge 1 each 5.6" x 4-'/i" Fluted WLEG Unigue Machine) Surface and Anti-Collision Issues Surface Shut-in Wells: L-200 will require surface shut-in and wellhouse removal in order to move over well L-250. No other wells should require wellhouse removal and surface shut-in. NOTE: The rig Toolpusher may require other well houses to be removed to accommodate the rig positioning on L-250. Close Approach Shut-in Wells: There are NO wells requiring subsurface isolation for this profile. The toe of the L2 lateral does come within 100' center to center of the L-210i PB1, and as such had to be risk based to pass anti-collision. Close Well List: 15.5-ft L-zo2 31.0-ft 761-ft 18.1-ft Use Travelin C inder G ro L-118 31.6-ft 1,117-ft 12.0-ft Use Travelin C inder G ro L-2121 48.0-ft 1,579-ft 20.7-ft Use Traveling Cylinder (Gvrol 2 Permit 10/10/05 Gre~Prudhoe Bay L-250 ML Permit Survey and Logging Program 13-~/z" Hole Section: Surface G ro if needed (have discussion with ODE on photo or E-line G ro) O en Hole Drillin MWD / GR Cased hole: None 9-/s Hole Section: " Surve s will need to be IFR + MS corrected real ti ~ ~ ~~ ~ ~ ~ ~~~ ~ ~~ ~ ~ ~" ~"~~~~~ ~ '°-~ _ ~ •., .,...w me Open Hole Drifiin MWD / GR / Res /Den / Neu /PWD Den / Neu recorded Open Hole: None Cased Hole: USIT Bond Lo onl as contin enc if oor cement 'ob 6-3/a" Hole Section: Surveys will need to be IFR + MS corrected real time Open Hole DriNing: MWD J GR 1 Res / Azimuthal Den / Neu /AIM /PWD Den / Neu recorded Cased Hole: None Mud Program Summary 13-'/2" Surface Hole Mud Pro erties: Spud -Freshwater M ud Interval /Densit Funnel vis YP Tauo PH Plastic Vis FL 0-1,800 8.6-9.2 250-300 50-70 10-18 8.5-9.0 20-45 NC-8 1,800 - 2,500 9.0 - 9 200 - 250 30 - 45 8 -16 8.5 - 9.0 20 - 40 6 2,500-3,200 9.3- 200 30-40 9-14 8.5-9.0 14-20 5.5-7 Interval Specific ~ Maintain Viscosity greater then 250 above the permafrost Objectives: Ensure fluid loss below permafrost is less then 6 Maintain mud tem erature below 50° F 9-'/e" Intermediate Hole Mud Pro erties: Freshwater Mud LSND PH: 9.0 - 9.5 interval /Densit Funnel vis YP Tauo PV API Filtrate MBT 8.$-9.3 45-60 22-30 3-6 12-18 4-6 <20 Maintain proper fluid rheology & lubricant concentration to achieve the directional {nterval Specific requirements Objectives: Optimize mud rheology to maximize ROP while following ECD guidelines a _..._ . ..,_ , Reduce shaker blindin while drillin the UGNU Drill-n-Slide or EMI-697 . . . 6-3/a" Production Hole Mud . ~, Pro erties: _ __., _~,_ W .. .: LVT-200 MOBM (Versa-Pro) Interval /Densit Stabilit YP Oil : H2O Ratio PV API Filtrate MBT 9.2 650 - 900 16 -19 80:20 Initial < 19 < 5 < 6 Utilize PST to periodically check fluid bypass through screen sections to ensure proper PSD throughout each interval. Interval Specific Allow Oil /Water ratio to drift between 80:20 and 70:30 while maintaining standard Objectives: rheological properties. Minimize solids/liquid invasion by maintaining optimum PSD of bridging agents. Maintain minimal ECD's by reducing drill solids accumulation through utilization of the rigs solids controls stem and effective dilution. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. Except for significant operational issues that may effect well integrity or pose safety concerns, an extension to the BOP period should not be requested. ROPE and drilling fluid system schematics are on file with the AOGCC. Intermediate and Production Intervals • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • Test Frequency: • Planned completion fluid: 1,884 psi C~3 4,160' TVDss (8.7 ppg EMW). Based on L-216 MDT's 1,468 psi @ surface (based on BHP & a full column of gas from TD ~ 0.10 psi/ft) 3,500 psi (7--%" casing will be tested to 3,500 psi) 14 day test cycle Estimated 9.1 ppg Brine / 6.8 ppg Diesel 3 Permit 10/10/05 - Gre~ Prudhoe Bay L-250 ML Permit Kick Tolerance/Integrity Testing: The 10-3/a" casing has been cemented to surface. The 7-6/e" casing will be cemented with 15.8 Ib/gal cement to (minimum of 700' MD above the Ma sand) within 1,000' of the surface casing shoe. Kick Tolerance / Inte ri Testin 'Summa Table Casin /Interval Acce table Influx Volume Mud Wei ht' Ex Pore Press Min LOT / F1T Surface / 9 '/B" 51.1 9.2 8.7 11.1 LOT Intermediate / 6-3/a" Infinite 9.2 8.7 10.5 FIT NOTE: FIT's will only be done on the first horizontal lateral due to pressure connectivity between subsequent laterals. NOTE: All LOT /FIT will be taken with a minimum of 20-ft and a maximum of 50-ft of new hole drilled outside of the revious casin strin NOTE: if the LOT /FIT is less then the minimum notify the ODE immediately Disposal NO ANNULAR INJECTION ON THIS WELL. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. Formation Markers „ ,, faormab ~'o . `` { x ._ = DsSJ ~~~Ft~11~D~;~, _: .. ,~ are s~-~ .. _ EM,W- ~ ~ '~~ °~h ~H ,irocarbo ~ ;a ,- ~ G1 255 Xx 115 8.7 No SV6 890 Xx 401 8.7 No Fault #1 980 Xx 441 SV5 1,480 Xx 666 8.7 No SV4 1,600 Xx 720 8.7 Poss. Gas H drates Base Permafrost 1,680 1,937 756 8.7 No SV3 1,965 2,276 884 8.7 Poss. Gas H drates SV2 2,125 2,536 956 8.7 Poss. Gas H drates SVt 2,445 3,056 1,100 8.7 Poss. Gas H drates UG4 2,740 3,535 1,233 8.7 Thin coal UG4A 2,770 3,584 1 247 ' 8,7 100' net Heavy Oil between 2770 - 2940' SS UG3 3,125 4,174 1,406 8.7 Thin coals! oss. Hea oil Fault #2 3,545 4,878 1,595 UG1 3,640 5,037 1,638 g,7 80' net Heary Oil between 3770 - 3910' SS Ma 3,920 5,507 1 764 ' 8.7 40' net Heavy Oil between 3915 - 3950' SS Mb1 3,960 5,579 1,782 8,7 45' net Heary Oil between 3960 - 4010' SS Mb2 4,015 5,688 1,807 g,7 60' net Heavy Oil between 4015 - 4090' SS Mc 4,090 5,867 1,841 g,7 15' net heavy oil between 4090 - 4130' SS Na 4,135 5,985 1,861 8.7 No Nb 4,160 6,051 1,884 8.7 Yes Nc 4,205 6,192 1,900 8.7 Yes OA 4,310 Xx 1,930 8.6 Yes 4 Permit 10/10/05 Gre'Prudhoe Bay L-250 ML Permit CasinglTubing Program 48" 20" X 34" 215.5# A53 Weld 80' 29'!29' 109'!109' 13-'/2" 10-3/a" 45.5# L-80 BTC 3,191' 29'/29' 3,220'/2,545' 9-%e" 7-5/8" 29.7# L-80 BTC-M 6,695' 29'/29' 6,724'/4,305' 6-3/a" OA 4-~12" slotted 12.6# L-80 BTC 2,970' 6,700'/4,301' 9,670'/4,427' 6-3/a" L1 Nb 4" x 4.8" Screen 15.5# L-80 1BT 2,490' 6 6 6'/ 28 ' 11 616'/4 343' 6-3/a" L1 Nb 4" Solid 10.9# L-80 IBT 2,490 , 3 4, 9 , , 6-3/a" L2 Nb 4" x 4.8" Screen 15.5# L-80 IBT 3,161' 6 226'14 214' 12 548'!4 363' 6-3/a" L2 Nb 4" Solid 10.9# L-80 IBT 3,161' , , , , _Tubing 4-'/z" 12.75# L-80 TCII 6,21 T 29'/29' 6,226'/4,214' NOTE: On N-sand laterals, the base case plan is to run 50% screens and 50% blank pipe. This may change based on the as-drilled profile and LW D logs. Cement Calculations Casin Size 10-3/a -in 45.5-Ib/ft L-80 BTC surface casing Basis 250% excess in permafrost. 30% excess below permafrost. To of tail cement 1,000' MD above shoe Cement Vol: Wash 20-bbl CW Spacer S acer 70-bbl 10.1-Ib/ al MudPush s acer Lead 464-bbl, 585-sx 10.7-Ib! al ASL - 4.44 ft /sx Cement to surface Tail 92-bbl, 441-sx 15.8-Ib/ al Premium G - 1.17 ft /sx To of tail: 2,219' MD Temp BHST ~ 55°F from SOR. BHCT 60°F estimated by Dowell In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Casin Size 7-6/a -in 29.7-Iblft L-80 BTC-M intermediate casing Basis Top of tail cement 700-ft MD above top of Schrader Ma-sand. 30% excess over auge. Total Cement Vol: Wash 25-bbl Water S acer 45-bbl 10.5-Ib/ al MudPush S acer Tail 128 bbl, 600-sx 15.8-Ib/gal Premium - 1.20 ft !sx with D600G - 2gallsk; D047 - 0.2gat/sk; D174 - 3% BWOC; 6153 - 0.15ga1/sk to of tail at 4,219-ft MD To Ma: 5,507' MD Temp BHST = 82°F from SOR, BHCT 77°F estimated by Dowell Drilling and Completion Scope of Work Pre-Rig Work: 1. A 34" x 20" insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. 2. tf necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and production simops. Drilling Rig Operations: 1. MIRU Nabors 9ES. Nipple up diverter spool and riser. Function test diverter. PU 4" DP and stand back in derrick. 2. MU 13-'/2" drilling assembly with MWD/GR and directionally drill surface hole to approximately 3,219' MD. The actual surface hole TD will be +/-100' TVD below the top of the SV1 sand. 3. Run and cement the 10-3/a", 45.5#, L-80 surface casing back to surface (NOTE: TAM port collar to be used at WSL discretion). ND drilling spool and riser and NU casing /tubing head. NU BOPE and test to 3,500 psi. 5 Permit 10/10/05 Gr~ Prudhoe Bay L-250 ML Permit 4. MU 9-%" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Weatherford Drill-Mill at 11,000' from the bit. RIH to float collar. Test the 10-3/a" casing to 3,500 psi for 30 minutes. 5. Drill out shoe track. Circulate and condition mud. Displace well to new 8.8 ppg LSND drilling fluid. Drill 20' of new formation below rathole and perform a LOT. Directionally drill ahead to TD (Into top OA as per geologist) as per directional profile to 6,724' MD. 6. Make short trip as needed, work tight spots as seen. Circulate and condition mud at TD. Make sure hole is clean prior to POOH. POOH for casing stand back 4" DP. ~~,~ ~~~- 7. MU and run 7-$/" 29.7# L-80 BTC-M casing to TD. Cement in one stage to 1,000' MD-a~e~he surface casing shoe. Bump plug with seawater. Land casing on mandrel hanger. NOTE: With cementing so close to the surface casing shoe, verify circulation down the annulus prior to the cement reaching 500 psi compressive strength. Minimize the volume pumped away prior to freeze protecting. 8. Clean pits for displacement. Freeze protect 7 5/8" x 9-S/e" annulus with dead crude to 2,200' TVD. PU 4" DP. 9. PU 6-3/a" directional assembly with MWD / GR / Res / Azimuthal Den /Neu /PWD /AIM and RIH to the float collar. Test the 7-5/8" casing to 3,500 psi for 30 minutes. Displace well over to new 9.2 ppg Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of new formation below rathole and perform an FIT to 10.5 ppg EMW. 10. Directionally drill ahead to TD geosteering through the OA to TD at 9,670' MD / 4,428' TVD (prognosed). Backream out of hole to the shoe, circulate and condition hole, RIW to TD and displace well to 9.2 ppg SFMOBM as per BP / MI displacement procedures. 11. POOH to near L1 Nb window depth, log up across the Nb, Nc sands to ensure proper window milling placements for subsequent laterals. POH LD drilling assembly. 12. MU and run 4-'/z" 12.6# L-80 IBT-M slotted liner with hanger and liner top packer to TD. Position liner top packer 90' below the planned L1 BOW. POOH and LD liner running assembly. NOTE: This assembly will require a plug to be run below the casing seal bore receptacle. See details in W P. 13. PU the 7 5/e" whipstock assembly. Set the whipsock on the OA liner top packer such that the top of the window is in the optimum position below the Nb sand to allow for at least 60' MD prior to entering the Nb sand (planned window exit: 6,623' MD). Orient whipstock to 15° left of highside. Shear off Whipstock. Displace wellbore back to MOBM as per BP / MI displacement procedures & mill window. POOH, LD milling assembly. 14. RIH with 6-3/a" drilling assembly with MWD / GR / Res / Azimuthal Den/ Neu /PWD /AIM to whipstock. Directionally drill the L1 Nb lateral to TD. Planned TD is 11,615' MD. Backream out of hole to the window, circulate and condition hole, RIH to TD and displace well to 9.2 ppg SFMOBM as per BP / MI displacement procedures. POOH. 15. Pull whipstock #1, LD whipstock and retrieval BHA. 16. Run and set the 4" x 4.8" Baker Excluder 2000 screen assembly, Swell Packers, and Baker Hook Hanger, POOH and LD liner running assembly. Run Baker Lateral Entry Module #1 with ZXP liner top packer. Circulate and condition mud, POOH and LD running tools. 17. PU the 7 6/e" whipstock assembly. Set the whipsock on the L1 Nb liner top packer such that the top of the window is in the optimum position above the Nb sand to allow for at least 60' MD prior to entering the Nb sand (planned window exit: 6,213' MD). Orient whipstock to 15° left of highside. Shear off of Whipstock, displace well back to MOBM as per BP ! MI displacement procedures & mill window. POOH 18. RIH with 6-3/a" drilling assembly with MWD / GR / Res / Azimuthal Den/ Neu 1 PWD / AIM to whipstock. Directionally drill the L2 Nb lateral to TD. Planned TD is 12,548' MD. Backream out of hole to the window, circulate and condition hole, RIH to TD and displace well to 9.2 ppg SFMOBM as per BP / MI displacement procedures. POOH. 19. Pull whipstock #2, LD whipstock and retrieval BHA. 20. Run and set the 4" x 4.8" Baker Excluder 2000 screen assembly, Swell Packers, and Baker Hook Hanger, POOH and LD liner running assembly. Run Baker Lateral Entry Module #2 with ZXP liner top packer. Circulate and condition mud. Clean pits for displacement. Displace over to 9.1 ppg KCL brine as per MI displacement procedures. POOH. 21. MU 4-ih" 12.75# TCII, L-80 completion assembly and RIH. See completion schematic for details. Land tubing hanger and run in lockdown screws. 22. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK-1 valve. 23. Install two-way check and test to 1,000 psi. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 24. Pull two-way check. Reverse in brine with Corexit to protect the annulus and freeze protect the well to 2,200' TVD. Install VR plug in 7-6/e" casing annulus valves. 25. Install BPV. Secure the well and rig down /move off Nabors 9ES. Post-Rig Work: 1. MIRU slickline. Pull the ball and rod /RHC plug. 2. Pull out DCK-1 shear valve, install GLV in all of the other mandrels as per the PE. 6 Permit 10/10/05 _ r• Gr~ Prudhoe Bay L-250 ML Permit Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control f Reservoir Pressures: Sand Heal Psi (ppg) :;TVDss .:. .. = : _Comments . Nb 1,884(8.7) 4,160 Based on L-216 MDT pressures OA 1,930 (8.6) 4,310 Based on L-216 MDT pressures II. Hydrates and Shallow gas: A. Gas Hydrates are expected at L-pad near the base of the permafrost. Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole. Recommended practices and precautions for drilling hydrates should be followed in the surface hole. Occasionally hydrates are encountered below the SV1. If hydrates are encountered follow the recommended practice and apply good drilling operational practices. III. Lost Circulation/Breathing: A. Lost circulation is not expected at the L-Pad fault. In addition the fault will be crossed at high angle and move away quickly. B. We do not expect breathing on this well as we are above the more prevalent breathing shale's i.e. Seabee. IV. Kick Tolerance/Integrity Testing: A. The 10-3/a" casing has been cemented to surface. B. The 7-$/a" casing will be cemented with 15.8 Ib/gal cement to within 1,000' of the surface casing shoe. C. Integrity Testing: NOTE: If the LOT /FIT is less then the minimum notify the ODE immediately Kick Tolerance / Int ri Testin Summa Table Casin /Interval Acce table Influx Volume Mud Wei ht Ex Pore Press Min LOT /FIT Surface / 9-'/" 51.1 9.2 8.7 11.1 LOT Intermediate / 6-3/a" Infinite 9.2 8.7 10.5 FIT NOTE: FIT's will only be done on the first horizontal lateral due to pressure connectivity between subsequent laterals. NOTE: Afl LOT I FIT wilt be taken with a minimum of 20-ft and a maximum of 50-ft of new hole drilled outside of the revious Casin strin V. Stuck Pipe A. There could be slight differential sticking across the reservoir while running the slotted liners. Keep the liners moving as much as possible and run one centralizer per joint to help with standoff. VI. Hydrogen Su{fide L Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. No measurable H2S is being produced from the formation at this time. However 10 ppm is measured regularly at L pad as a result of the use of Ivishak gas lift gas. All L pad gas lift wells will likely have H2S in this concentration. Note that all injection has been with produced water not seawater. H2S levels are expected to remain low until the waterflood matures. VII. Faults A. Two faults are expected to be crossed at L-202. No losses are expected to be associated with this fault. Details are listed below for reference: Fault Location MD TVDss Throw Direction Uncertainty Fault #1 - SV6 1,065' 980' 60' to 80' West +/- 150' MD Fault #2 - UG3 5,008' 3,545' S0' to 70' South +!- 150' MD Fault #3 - OA Leg 8,543' 4,348' 0' to 10' North +/- 250' MD Fault #4 - L1 Nb Leg 5,171' 4,216' 0' to 10' North +/- 250' MD CONSULT THE L PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 7 Permit 10/10/05 POST RIG - COMPLETIOItiT TREE: FMC 4-1/16" 5M Orig KB elev (N-9ES) = 28.5' L-250, L-250 L1 & L-250 L2 WELLHEAD: FMC Gen 5 System 11", 5M csg.head wl 7" mandrel hanger 8, packoff 11" x 11", SM, tbg spool w/ I =.: 11" x 4-1/2" tubing hanger with control line ports 11" X 4-1/16" Adaptor Flange 20" X 34" 215.5 Ib/ft, A53 ERW Insulated 109' Halliburton X-Nipple (3.813" ID) 2,200' TVD 4-1/2", 12.75 Ib/ft, L-80, TCII Coupling OD: 4.932" Drift/ID : 3.833"/3.958" ,!unction Snecifications: Junction ID through LEM Module without diverter: 3.65" 10-3/4", 45.5# L-80 BTC Csg @ 3,219' MD 4.5" Baker sliding sleeve with 3.813" ID 7-5/8" X 5-1/2" Baker PRM Packer Halliburton X-Nipple (3.813" ID) Phoenix Pressure Gauge 4.5" WLEG ^-6,184' with encapsulated I-wire to surface 9.2 PPG Versapro SFMOBM below Completion ~ ,t , RA Tag TBD 4" x 6.4" OD Swell Packer o n 4",10.9# base pipe / ~~ ~ 6-3/4" NB-2 Lateral 6,225'-12,548' Baker Hughes Hookwall Hanger @ 6,209' MD ~ _ ~ :_t~~ . TOW in 7-5/8" casing @ 6,213' MD BOW in 7-518" casing @ 6,225` MD ~ ___. Well Inclination @ Window = 75° ~'~ °~~ " V r` } Nb laterals will have 4" x 4.8 OD -~%%~,, ~ '~ Baker Excluder screens and 4" i 10.9 liner throughout. M nimum RA Tag TBD ID= 3.476", Drift:3.351" ,^ . ~, 4" NB-1 Lateral 6-3/ 6,635 -11,615 Baker Hughes Hookwall Hanger @ 6,620' MD ~~ `== I , , TOW in 7-5/8" casing @ 6,623' MD ~ ~ I ' ~ _ _ __ BOW in 7-5/8" casing @ 6,635' MD ~ Well Inclination @ Window = 80° ~• • OA lateral will have 4- ` ~ 1/2" 12.6# slotted liner. ~ r,` .. RA Tag TBD %`~~ Minimum ID= 3.958", ;~~ Drift:3.833° Baker ZXP Liner Top Packer & Hanger @-9;x#9'' MD '\1~y __ c,,'~~~ ~Gft- _~ _.- - r' "~+:-- 7-5/8", 29.7#, L-80, BTC-M Casing Drift: 6.75" 7-5/8" Casing Shoe @ 6,724' MD Casing ID: 6.875" 6-3/4" OA Lateral 6,724'- 9,670' DATE REV. BY COMMENTS ~~ 10/11/2005 MIK TRIOLO Level 3 Multi-Lsteral, M1/2" GL Complsdoo d~iGT ORION API NO: ~-029 •s>~" ~o WELL: L-250 ML so-029 xxxxx-61 by L-250L2 (P3) P Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure I Slot: Well: L-PAD / L-250 (NM-15) ~~ ~~~ Plan L-250 (NM-15) Borehole: ~ ~~ Plan L-250L2 ~~ UWUAPI#: 50029 Survey Name 1 Date: L-250L2 (P3) /September 12, 2005 Tort 1 AHD I DDI I ERD ratio: 320.764° / 10376.88 ft 16.981 / 2.37£ Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feel Location LatlLong: N 70.35064557, W 149.32453840 Location Grid NIE YIX: N 5978285.860 ftUS, E 583194.780 ftUS Grid Convergence Angle: +0.63613156° osa~ Schlumberger Survey I DLS Computa0on Method: Minimum Curvature / Lubinski Vertical Section Azimuth: 106.030° Vertical Section Origin: N 0.000 ft, E 0.000 ft ND Reference Datum: Rotary Table ND Reference Elevation: 77.50 ft relative to MSL Sea Bed I Ground Level Elevation: 49.00 ft relative to MSL Magnetic Declination: 24.422° Total Field Strength: 57577.221 nT MagneBc Dip: 80.848° Declination Date: November 10, 2005 Magnetic Declination Model: BGGM 2005 North Reference: True North Total Con Mag North -> True North: +24.422° Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth SulrSea ND ND Vertical NS EW Tool Face DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section R de de ft k ft ft ft de de 1100 ft de 1100 H de 100 k ftUS ftUS ivN vvniNmvi.n vcic.w iv.vi ca.ao wiao.w wei~.o~ iww.oi J/o~.0o IWJAJ U.UUV 4.VV 4.UU U.VL oyaZUbif.tSL atf4325t7.Zr5 N /U.36U`J441t5 W 14y.314b1y3b Base Whipstock 6225.86 77.09 29.98 4136.13 4213.63 147.61 3780.78 1239.85 O.OOG 16.00 16.00 0.00 5982079.82 584392.46 N 70.36097403 W 149.31446814 KOP Crv 121100 6237.86 77.09 29.98 4138.82 4216.32 150.43 3790.92 1245.69 88.69G 0.00 0.00 0.00 5982090.01 584398.20 N 70.36100171 W 149.31442065 6300.00 77.37 37.62 4152.57 4230.07 168.92 3841.23 1279.38 86.99G 12.00 0.45 12.30 5982140.70 584431.32 N 70.36113916 W 149.31414695 6400.00 78.27 49.86 4173.75 4251.25 214.30 3911.69 1346.84 84.40G 12.00 0.90 12.24 5982211.90 584497.99 N 70.36133161 W 149.31359893 6500.00 79.69 62.01 4192.93 4270.43 277.16 3966.54 1428.00 82.07G 12.00 1.42 12.14 5982267.64 584578.53 N 70.36148141 W 149.31293963 6600.00 81.56 74.02 4209.28 4286.78 354.75 4003.38 1519.32 80.11 G 12.00 1.87 12.02 5982305.49 584669.42 N 70.36158201 W 149.31219785 6700.00 83.78 85.91 4222.08 4299.58 443.69 4020.61 1616.80 78.58G 12.00 2.23 11.89 5982323.79 584766.70 N 70.36162900 W 149.31140602 6800.00 86.27 97.70 4230.78 4308.28 540.08 4017.46 1716.19 77.56G 12.00 2.49 11.78 5982321.74 584866.11 N 70.36162034 W 149.31059876 6900.00 88.92 109.41 4234.99 4312.49 639.71 3994.08 1813.14 77.07G 12.00 2.64 11.72 5982299.44 584963.30 N 70.36155640 W 149.309 90° Pt 6932.70 89.80 113.24 4235.36 4312.86 672.27 3982.19 1843.60 77.02G 12.00 2.69 11.70 5982287.89 584993.88 N 70.36152391 W 149.30956401 7000.00 91.61 121.11 4234.53 4312.03 738.24 3951.48 1903.41 77.12G 12.00 2.69 11.70 5982257.86 585054.03 N 70.36143998 W 149.30907820 7100.00 94.23 132.83 4229.42 4306.92 831.35 3891.54 1983.07 77.72G 12.00 2.62 11.73 5982198.81 585134.34 N 70.36127617 W 149.30843138 End Crv 7161.26 95.76 140.05 4224.08 4301.58 883.94 3847.35 2025.09 O.OOG 12.00 2.49 11.78 5982155.09 585176.85 N 70.36115541 W 149.30809011 Crv 6!100 7164.08 95.76 140.05 4223.80 4301.30 886.26 3845.20 2026.89 -98.77G 0.00 0.00 0.00 5982152.96 585178.67 N 70.36114954 W 149.30807551 7200.00 95.42 137.91 4220.30 4297.80 916.26 3818.23 2050.35 -98.98G 6.00 -0.93 -5.96 5982126.25 585202.43 N 70.36107583 W 149.30788500 7300.00 94.46 131.97 4211.68 4289.18 1003.44 3747.89 2120.84 -99.49G 6.00 -0.96 -5.94 5982056.71 585273.69 N 70.36088362 W 149.30731263 7400.00 93.45 126.04 4204.78 4282.28 1095.24 3685.13 2198.34 -99.90G 6.00 -1.01 -5.93 5981994.82 585351.86 N 70.36071211 W 149.30668339 7500.00 92.40 120.12 4199.67 4277.17 1190.68 3630.64 2281.98 -100.20G 6.00 -1.05 -5.92 5981941.27 585436.10 N 70.36056319 W 149.30600417 7600.00 91.33 114.22 4196.41 4273.91 1288.70 3585.03 2370.86 -100.39G 6.00 -1.07 -5.91 5981896.65 585525.47 N 70.36043849 W 149.30528243 7700.00 90.24 108.32 4195.05 4272.55 1388.23 3548.77 2463.99 -100.47G 6.00 -1.09 -5.90 5981861.44 585618.99 N 70.36033937 W 149.30452606 L-250L2 Tgt 1 7721.97 90.00 107.02 4195.00 4272.50 1410.19 3542.11 2484.93 -99.16G 6.00 -1.09 -5.90 5981855.00 585640.00 N 70.36032114 W 149.30435604 End Crv 7795.46 89.30 102.67 4195.45 4272.95 1483.65 3523.28 2555.95 O.OOG 6.00 -0.95 -5.92 5981836.97 585711.22 N 70.36026965 W 149.30377928 WeIlDesign Ver SP 1.0 Bld( doc40x_56) L-250 (NM-15 )\Plan L-250 (NM-15)\Plan L-250L2\L-250L2 (P3) Generated 9/12/2005 9:22 AM Page 1 of 2 Measured Vertical Comments Inclination Azimuth Sub-Sea ND ND NS EW Tool Face DLS Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section ft de de ft ft ft ft ft d de 100 ft de 1100 ft de 1100 ft ftUS ftUS l,.rV O/IVU Oy4V. ~L Oy.JV IVL .O/ 4LUy.40 4LOO. yO GOL/.VJ 3L/L . IL 30/3.44 -OO.yIU U.UV U.UU U.VV O`JO IbYO. Lb 'ObO31.JJ IV /V .JO`JOOLLL VV 14`J.L`J4/U4~IL L-250L2 Tgt 2 8985. 38 89. 35 100 .00 4210.00 4287. 50 2671.35 3263 .38 3717.03 -88 .70G 6.00 0.12 -6.00 5981590. 00 586875 .00 N 70 .35955830 W 149.29435020 9000. 00 89. 37 99 .12 4210.16 4287. 66 2685.87 3260 .96 3731.44 -88 .69G 6.00 0.14 -6.00 5981587. 73 586889 .44 N 70 .35955165 W 149.29423312 End Crv 9019. 43 89. 40 97 .96 4210.37 4287. 87 2705.14 3258 .07 3750.66 O .OOG 6.00 0.14 -6.00 5981585. 06 586908 .68 N 70 .35954374 W 149.29407709 Crv 61100 9315. 82 89. 40 97 .96 4213.49 4290. 99 2998.58 3217 .04 4044.18 88 .03G 0.00 0.00 0.00 5981547. 30 587202 .62 N 70 .35943123 W 149.29169340 9400. 00 89. 57 103 .01 4214.25 4291. 75 3082.33 3201 .73 4126.92 87 .99G 6.00 0.21 6.00 5981532. 91 587285 .52 N 70 .35938929 W 149.29102147 9500. 00 89. 78 109 .00 4214.81 4292. 31 3182.28 3174 .18 4223.00 87 .95G 6.00 0.21 6.00 5981506. 42 587381 .89 N 70 .35931387 W 149.29024129 9600. 00 90. 00 115 .00 4215.00 4292. 50 3281.69 3136 .74 4315.68 87 .94G 6.00 0.22 6.00 5981470. 02 587474. 96 N 70 .35921143 W 149.28948879 L-250L2 Tgt 3 9600. 04 90. 00 115 .00 4215.00 4292. 50 3281.73 3136 .72 4315.71 88 .50G 6.00 0.22 6.00 5981470. 00 587475. 00 N 70 .35921138 W 149.2 9700. 00 90. 16 121 .00 4214.86 4292. 36 3379.47 3089 .81 4403.93 8$ .51 G 6.00 0.16 6.00 5981424. 08 587563 .73 N 70 8 .35908311 W 149.28 9800. 00 90. 31 126 .99 4214.45 4291. 95 3474.55 3033 .93 4486.81 88 .54G 6.00 0.15 6.00 5981369. 13 587647 .21 N 70 .35893030 W 149.2880 49 End Crv 9855. 92 90. 40 130 .35 4214.11 4291. 61 3526.16 2998 .99 4530.46 O .OOG 6.00 0.15 6.00 5981334. 68 587691. 24 N 70 .35883479 W 149.28774514 Crv 6/100 10405. 15 90. 40 130 .35 4210.31 4287. 81 4026.64 2643 .42 4949.03 -94 .23G 0.00 0.00 0.00 5980983. 81 588113. 69 N 70 .35786267 W 149.28434772 L-250L2 Tgt 4 10494. 52 90. 00 125 .00 4210.00 4287. 50 4109.68 2588 .82 5019.74 -95 .84G 6.00 -0.44 -5.98 5980930. 00 588185. 00 N 70 .35771337 W 149.28377376 10500. 00 89. 97 124 .67 4210.00 4287. 50 4114,87 2585 .69 5024.24 -95 .84G 6.00 -0.61 -5.97 5980926. 92 588189. 53 N 70 .35770481 W 149.28373724 10600. 00 89. 36 118 .70 4210.59 4288. 09 4211.11 2533 .18 5109.29 -95 .81 G 6.00 -0.61 -5.97 5980875. 37 588275. 15 N 70 .35756122 W 149.28304684 10700. 00 88. 75 112. 73 4212.24 4289. 74 4309.63 2489 .81 5199.33 -95 .71G 6.00 -0.60 -5.97 5980833. 00 588365. 66 N 70 .35744257 W 149.28231589 10800. 00 88. 17 106 .76 4214.93 4292. 43 4409.34 2456 .05 5293.37 -95 .55G 6.00 -0.59 -5.97 5980800. 29 588460. 06 N 70 .35735016 W 149.28155239 10900. 00 87. 60 100 .78 4218.63 4296. 13 4509.14 2432 .27 5390.39 -95 .33G 6.00 -0.57 -5.98 5980777. 60 588557. 33 N 70 .35728501 W 149.28076471 End Crv 10974. 85 87. 19 96. 31 4222.04 4299. 54 4583.27 2421 .17 5464.32 O .OOG 6.00 -0.55 -5.98 5980767. 31 588631. 37 N 70 .35725452 W 149.28016442 Crv 6/100 11094. 46 87. 19 96. 31 4227.91 4305. 41 4701.01 2408. 05 5583.06 83 .45G 0.00 0.00 0.00 5980755. 51 588750. 24 N 70 .35721843 W 149.27920023 11100. 00 87. 23 96 .64 4228.18 4305. 68 4706.47 2407. 42 5588.55 83 .43G 6.00 0.69 5.97 5980754. 95 588755. 74 N 70 .35721672 W 149.27915562 L-250L2 Tgt 5 11139. 62 87. 50 99. 00 4230.00 4307. 50 4745.64 2402 .04 5627.76 84 .91 G 6.00 0.69 5.97 5980750. 00 588795. 00 N 70 .35720193 W 149.27883724 End Crv 11189. 08 87. 77 101. 96 4232.04 4309. 54 4794.82 2393. 05 5676.35 O .OOG 6.00 0.54 5.98 5980741. 55 588843. 68 N 70 .35717728 W 149.27844274 TD / 4-112" Lnr 12547. 98 87. 77 101 .96 4285.00 4362. 50 6149.26 2111. 71 7004.75 O .OOG 0.00 0.00 0.00 5980475. 00 590175. 00 N 70 .35640560 W 149.26765738 ~. r ~J WeIlDesign Ver SP 1.0 Bld( doc40x_56) L-250 (NM-15 )\Plan L-250 (NM-15)\Plan L-250L2\L-250L2 (P3) Generated 9112!2005 922 AM Page 2 of 2 by Schlumberger WELL L-250L2 (P3) FIELD Prudhoe Bay Unit - WOA STRUCTURE L-PAD Magne4e Parameters Surface Loulun NAD2/ Naska S1de Plains. Zone 04. US Fecl Mafallax°~u M°°el BDGM 2005 Dip: BO.bdB' Dare N°vem1rer 10. 2005 La' (t 2.324 on6mg. S9]F2bS B6 fNS Crq COfrv. A6]6t31S6' ] a Std. L-2501NM~151 NDReI: Rgary Table ~''/Y 5011 above MSL) Meg Dec x24423° FS ]].2 nT W f 5 t92B.33tl Eas4ng: S83f94 ]B MIS Scala Fact 099990]8625 PMn L-250L21P3) Srvy Dale November 10. 2005 0 800 1600 2400 3200 4000 4800 5600 3200 O O t?0 ~ 4000 O) U 4800 -250 (P1~ ' Top Whipstock • Base Whi stock L-~50L2 Tgt 1 ~ -250L2 Tgt 5 ............... .... ... .. P..CJ.Y.1 T/.100.;.......................... ~ L-2$OL2T t2 Crv 01100 ..•.,, •:L-250L2 Tgt3 L-250L2:fgt0 . ............................................ ......A ,LCry, 6/100 . ..... End (;rv Crv 6/100 En Crv ..... .................................... ..... ................ ................... .......................... 4 ... .. ..:.. 90° Pt Cfv OI700 End Crv End Crv Crv 61140 End Crv • End Crv TD 14-1IY" Lnr 7-5/0" Csg Pt -250L1 (P8): L-250 (P10) ; 4 -250 ' •i 3200 4000 (P3) 4800 • 0 800 1600 2400 3200 4000 4800 5600 Vertical Section (ft) Azim = 106.03°, Scale = 1(in):800(ft) Origin = 0 N/-S, 0 E/-V 4800 n ~ 4000 Z o` 0 c 3200 m U V V V 2400 4800 4000 • 3200 2400 by Schlumberger ~" L-250L2 (P3) F1ELV Prudhoe Bay Unit - WOA BmDDTDRE L-PAD Maylreti<Parama!ers Surlace LOraucri NAD2I Alaaka Slain Plantls. Zone 06. U5 Feet MlswlldnBOUs Mo0at. BGGM 2005 Dip. 80.868° Dale Novemlwrt0. 2005 Lai. N]02t 2J2d orlttiny. 55 /6[8S B6IIU5 GnJ DOnv b63fit 3156' Sbt 160INM-151 NO Re! Rotary Ta0le l/]50A move MSl1 Ma9 Dec: .21622' FS'. 5]S]]2nT Lm W169 :928338 Easunq. 58J196 ]61105 Sula Fact 055990]6625 Pbn L-25CL21PJ1 Sny Dale N ember 10. 2005 800 1600 2400 3200 4000 4800 5600 6400 7200 1600 I ......:..................................a..................................;..................................:..................................~..................................:..................................:..................................:......................~..~ 1600 800 1600 2400 3200 4000 4800 5600 6400 7200 «< W Scale = 1(in):800(ft) E »> BP Alaska Anticollision Report Company: BP Amoco Field: Prudhoe Bay Reference Site: PB L Pad Reference Wcll: Plan L-250 (NM-15) Reference N'ellpath: Plan L-250L2 NO GLOBAL SCAN: Using user defined selection & scan criteria ~ Interpolation Method: MD Interval: 20.00 ft Depth Range: 6212.86 to 12547.98 ft Maximum Radius:10000.00 ft ', Survey Program for Definifive Wellpath Date: 8/29/2005 Validated: No Planned From To Survey ft ft '~ 28.50 1500.00 Planned: Plan #12 V1 (0) 1500.00 6212.86 Planned: Plan #12 V1 (0) 6212.86 12547.98 Planned: Plan #3 V1 Casing Points MU fVD Diameter Hole Size Nance ft ft in in 3368.84 2637.50 10.750 13.500 10 3/4" 6212.86 4210.50 7.625 9.875 7-5/8" 2547.98 4362.50 4.500 6.750 4 1 /2" Summary <---------------- Onset Wellpath ------------> Site Well Wellpath ~ PB L Pad PB L Pad PB L Pad PB L Pad PB L Pad PB L Pad PB L Pad PB L Pad PB L Pad !, PB L Pad PB L Pad PB L Pad PB L Pad PB L Pad ~ PB L Pad PB L Pad i PB L Pad PB L Pad ', PB L Pad i, PB L Pad PB L Pad ~~ PB L Pad ~,' PB L Pad PB L Pad PB L Pad PB L Pad PB L Pad PB L Pad '; PB L Pad PB L Pad PB L Pad PB L Pad PB L Pad PB L Pad ', PB L Pad PB L Pad PB L Pad PB L Pad ~, PB L Pad PB L Pad PB L Pad L-01 L-02 L-02 L-02 L-02 L-03 L-101 L-102 L-102 L-102 L-103 L-104 L-105 L-106 L-107 L-108 L-109 L-110 L-111 L-112 L-114 L-114 L-115 L-116 L-117 L-118 L-119 L-120 L-121 L-121 L-122 L-124 L-124 L-124 L-200 L-200 L-200 L-200 L-200 L-201 L-201 .Date: 9112/2005 "Time: 10:59:51 Page: Co-ordinate(NE) Reference: Well: Plan L-250 (NM-15), True North Vertical (TVD) Reference: L-250 Plan 77.5 Dh: Oracle Reference: Principal Plan & PLANNED PROGRAM Error Model: ISCWSA Ellipse Scan Method: Trav Cylinder North Error Surface. Ellipse + Casing Version: 6 i I Toolcode Tool Name -- -- -.J GYD-GC-SS Gyrodata gyro single shots MWD+IFR+MS MWD +IFR + Multi Station MWD+IFR+MS MWD +IFR + Multi Station 'Reference MD ft L-01 V14 7709.51 L-02 V1 L-02A V5 L-02AP61 V2 L-02P61 V21 L-03 V5 10818.19 L-101 V4 7550.00 L-102 V2 12161.93 L-102P61 V10 8066.79 L-102P62 V2 8017.37 L-103 V23 10550.00 L-104 V7 10900.00 L-105 V4 10618.65 L-106 V14 7750.00 L-107 V14 7721.97 L-108 V18 7721.97 L-109 V12 L-110 V11 L-111 V24 L-112 V8 L-114 V15 L-114A V4 L-115 V7 L-116 V10 L-117 V11 6212.86 L-118 V9 6213.74 L-119 V9 7985.66 L-120 V8 10466.79 L-121 V14 L-121A V1 L-122 V5 L-124 V11 6212.86 L-124P61 V5 6212.86 L-124PB2 V4 6212.86 L-200 V7 6283.41 L-200L1 V3 6283.41 L-200L2 V6 6283.41 Plan L-200L3 OA V1 Pla 6283.41 Plan L-200L3P61 OA V4 6283.41 L-201 V6 7656.37 L-201L1 V9 7656.37 Offset Ctr-Ctr No-Go Allowable MD Distunce Arcs Deviation Wnrning ft ft ft ft 4940.00 4984.81 81.02 4903.79 Pass: Major Risk Out of range 'i Out of range I~ Out of range ', Out of range 7260.00 3331.40 204.17 3127.23 Pass: Major Risk 6300.00 2615.91 85.21 2530.70 Pass: Major Risk I 8380.00 2318.10 245.30 2072.80 ~ Pass: Major Risk 3464.00 3970.71 96.80 3873.91 Pass: Major Risk 3464.00 3913.72 93.54 3820.18 Pass: Major Risk 6940.00 2047.91 158.54 1889.37 Pass: Major Risk 7200.00 3492.14 214.79 3277.35 Pass: Major Risk 6700.00 3771.03 167.19 3603.83 Pass: Major Risk 5000.00 3684.57 84.20 3600.37 Pass: Major Risk 3240.00 5056.76 81.51 4975.25 Pass: Major Risk i, 4520.00 5264.22 82.57 5181.65 Pass: Major Risk Out of range Out of range Out of range ~ Out of range i , Out of range Out of range Out of range Out of range 6900.00 1505.65 136.62 1369.03 Pass: Major Risk 6220.00 295.93 115.53 180.39 Pass: Major Risk ~I 6560.00 577.84 89.06 488.77 Pass: Major Risk 7320.00 1397.05 128.36 1268.68 Pass: Major Risk Out of range Out of range Out of range 7660.00 2660.49 124.14 2536.35 Pass: Major Risk 7660.00 2660.49 124.15 2536.34 Pass: Major Risk 7660.00 2660.49 124.14 2536.35 Pass: Major Risk 6200.00 450.09 100.31 349.78 Pass: Major Risk 6200.00 450.09 100.31 349.78 Pass: Major Risk 6200.00 450.09 100.31 349.78 Pass: Major Risk 6200.00 450.09 100.41 349.68 Pass: Major Risk 6200.00 450.09 100.41 349.68 Pass: Major Risk 6140.00 842.82 86.29 756.52 Pass: Major Risk 6140.00 842.82 86.29 756.52 Pass: Major Risk BP Alaska Anticollision Report - - - - ', Company: BP Amoco Date: 9/12/2005 Time: 10:59:51 Page: 2 ~~~ Field: Prudhoe Bay Reference Site: PB L Pad Co-ordinate(Nb:) Keference: Well: Plan L-250 (NM-15), True North Reference ~i~ell: Plan L-250 (NM-15) Vertical (TVD) Reference: L-250 Plan 77.5 Reference Wellpath: Plan L-250L2 DV: Oracle SUIn mAC'V <-------- Offset Wellpath ----------> Reference Offset Ctr-Ctr No-Co Allowable Site Wcll Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft PB L Pad L-201 _-._ L-201L1PB1 V10 - 7656.37 6140.00 842.82 86.29 756.52 Pass: Major Risk ', PB L Pad L-201 L-201 L2 V5 7656.37 6140.00 842.82 86.29 756.52 Pass: Major Risk PB L Pad L-201 L-201 L3 V2 7735.88 6280.00 832.44 89.51 742.93 Pass: Major Risk PB L Pad L-201 L-201 L3P61 V6 7735.88 6280.00 832.44 89.51 742.93 Pass: Major Risk PB L Pad L-201 L-201PB1 V12 7656.37 6140.00 842.82 86.29 756.52 Pass: Major Risk PB L Pad L-201 L-201 PB2 V3 7656.37 6140.00 842.82 86.29 756.52 Pass: Major Risk ', PB L Pad L-202 L-202 V5 7324.23 6840.00 142.57 82.08 60.48 Pass: Major Risk ', PB L Pad L-202 L-202L1 V7 7324.23 6840.00 142.57 82.08 60.48 Pass: Major Risk PB L Pad L-202 L-202L2 V6 7324.23 6840.00 142.57 82.08 60.48 Pass: Major Risk PB L Pad L-202 L-202L3 V6 8686.64 8220.00 106.66 73.76 32.90 Pass: Major Risk PB L Pad L-210 L-210 V6 12484.66 8500.00 936.67 251.11 685.56 Pass: Major Risk PB L Pad L-210 L-210PB1 V8 12494.59 8920.00 101.72 41.43 60.29 Pass: Minor 1!200 PB L Pad L-211 L-211 V6 Out of range PB L Pad L-211 L-211 P61 V6 Out of range PB L Pad L-212 L-212 V11 6237.86 6500.00 1730.65 137.40 1593.24 Pass: Major Risk PB L Pad L-212 L-212PB1 V9 Out of range PB L Pad L-212 L-212PB2 V2 6236.96 6660.00 2344.02 140.18 2203.85 Pass: Major Risk PB L Pad L-214 L-214 V9 11767.97 7640.00 2372.76 243.94 2128.82 Pass: Major Risk PB L Pad L-215 L-215PB1 V2 Plan: Plan 8811.69 6700.00 612.64 104.34 508.30 Pass: Major Risk PB L Pad L-215 Plan L-215 V5 Plan: PI 8829.84 6760.00 609.11 109.18 499.93 Pass: Major Risk PB L Pad L-216 L-216 V6 7296.02 6300.00 636.37 76.67 559.70 Pass: Major Risk PB L Pad L-218 L-218 V4 Out of range PB L Pad NWE1-01 L-100 V2 Out of range PB L Pad NWE1-01 NWE1-01 V5 Out of range i PB L Pad Plan L-123 (S-U) Plan L-123 V3 Plan: PI 11003.95 8460.00 1368.08 162.49 1205.59 Pass: Major Risk ' PB L Pad Plan L-125 (N-F) Plan L-125 VO Plan: PI Out of range ~~ PB L Pad Plan L-125 (N-F) Plan L-125P61 V1 Plan: Out of range PB L Pad Plan L-213 (S-Q) Plan L-213 V5 Plan: PI 10750.00 6160.00 4309.47 199.36 4110.11 Pass: Major Risk PB L Pad Plan L-250 (NM-15) Plan L-250 V2 Plan: PI 6299.64 6300.00 4.03 154.00 -149.97 FAIL: Major Risk PB L Pad Plan L-250 (NM-15) Plan L-250L1 V9 Plan: 6299.64 6300.00 4.03 154.25 -150.22 FAIL: Major Risk PB L Pad PB L P d Plan L-50 (S-D) Pl 51 L S B Plan L-50 V2 Plan: Pla Pl L 51 V1 Pl l 10974.86 108 0 0 13064.23 308 5889.68 4 171.38 141 5718.30 47 Pass: Major Risk P Ri k a ( an - - ) an - an: P a 5 . 0 1 5.11 5130.0 .57 4988. ass: Major s PB L Pad Plan L-52 (S-E) Plan L-52 V1 Plan: Pla 9790.22 14160.00 4649.84 92.84 4557.00 Pass: Major Risk i ! Field: Prudhoe Bay Site: PB L Pad ' Well: Plan L-250 (NM-15) '~i Wellpath: Plan L-250L2 ~~ 0 ' loo I -o lao i ~i sg tev Travelling Cylinder Azimuth (TFO+pZI) [deg] vs Centre to Centre Separation [100tVin] • PERMIT TO DRILL 20 AAC 25.005 • (e) If a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well branches are proposed from a single conductor, surface, or production casing, the applicant shall designate one branch as the primary wellbore and include all information required under (c) of this section with the application for a Permit to Drill for that branch. For each subsequent welt branch, the application for a Permit to Drill need only include information under (c) of this section that is unique to that branch and need not include the $100 fee. • • TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME PTD# CHECK WHAT ADD-ONS "CLUE" APPLIES (OPTIONS) MULTI The permit is for a new wellbore segment of LATERAL existing well , Permit No, API No. (If API number Production should continue to be reported as last two (Z) digits a function of the original API number stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(f), all (PH) records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 - 70/80) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject to full EXCEPTION compliance with 20 AAC 25.055. Approval to perforate and produce/infect is contingent upon issuance of a conservation order approving a spacing exception. (Company Name1 assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Rev: 04/01/05 C\j ody\transmittal_checklist WELL PERM IT CHECKLIST Field & Pool PRUDHOE BAY, ORION SCHR BL OIL - 640135 Well Name: PRUDHOE BAY UN GRIN L-250 L2 Program DEV Well bore seg 0 PTD#:2051540 Company B XPLORATiON (ALASKA) INC Initial Class/type DEV! 1-OIL GeoArea Unit On/Off Shore On Annular Disposal ^ Administration 1 Petmitfee attached- - - - - - - - - - - YeS _ - - - - - - - - - - - 2 Lease number appropriate_ - - - - - - Yes .. - - - - - 3 Unique well-name andnumber_ __ _________ _ _________ _____Yes ___ __ ___ ____ _-_ _ _-, 4 Well located in-a_defined_pool._--____________________________ ___ __Yes-._-__-____-__--_- -_ - - 5 Well locatedproperdistanrefromdrillingunitboundary_,__--_.__-__-___ .___.Yes-____--_-_____-_--_ __________________________________________.-_ _-_-_ 6 Well located p[operdistanGe_fro_m-gtherwells_-_____--_-___-. -.__-Yes_-__----_-__-__-_-. ---------------------------------------------------- 7 Sufficient acreage available indrillinqunit,___-___-___--.__-.- - _-_Yes-__--_-_-_______________ ~ - - - - 8 If_deviated,is-wellboreplatincluded_________-_---__--___._- ----._Yes_-_-- -_-_------------ -- --__~ - - - - 9 Operatoi9nlyaffectedparty_._-_______-__________ __-.-Yes-----------------------.-.- - - - 10 Operaiolhasappropriate_bondinforce- --- -- - - -- --- - -- Yes----- -- -- ------- -~ - ------- - ------~-- - -- --- -- -- --------- 11 Permit canbe[ssuedwithout4onservationorder-__._-___---___- - ___._Yes___-_-______________-_.__-_________________,_._-__-_,__-_-_-__--_-- Appr Date 12 Permit_can be issued without administrative_approval - _ _ - _ - _ - - _ - _ _ - _ _ - _ _ - - -Yes _ _ _ _ _ _ . - - . - . - - . _ . _ _ _ . - . - _ _ RPC 10!12!2005 13 Can permit be approved before 15-day wait Yes 14 Well located within area and strata authorized4y_InjectionOrdar#(put_IO#incomments)_(For-NA-_-_-_-___-_--__-_-._-- __-___,_-_-_-____________________________----_- 15 Allwells_within1l4_mileareaofreyiewidentified(Fo[seruicewellonly)_________ ______ NA-_-___,__.___--_____--.--__---____._._-___--_____-_---___-__-__.__-----_- 16 Pre-produced injector: duration of preproductign less than 3 months-(For service well only) - NA_ - _ - , - - - - 17 ACMP-Finding of Consistency_hasbeenissued_for_thisproject______________ ______ NA__-__--____-_-____-_- --__--__-_,_-__-___,-_-_-_-_ _-._-_--_-____---_- Engineering 18 Conductor string.provided__-_._-___--____-___-.-__________ ______ NA-_-__--_____--__-___-___ --------------------------------------------------- 19 Su[face casing-protects all known USDWs - - - - KA - - - - - - - - - - - - 20 CMT-vol_adequate_tocircul_ate.on.conductor_&surf_csg___-_-_-___-___ -___.-NA__________________-_-,_-_,__-___-__-__-_---_- ---------------------------- 21 CMT_vol_ adequate-to tie-in long string to surf csg, - - - - - ~_ - - - - - - - - - - - - - - - 22 CMTwilfcoyeraflknow_n-productivehorizons________________________ ______ No__-__-$lotted,__-_-____-_-_-___-__-__--____-_--_____-__._-_._ - - 23 Casing designs adequatef_o[G,TB&-permafrost__-__-_,------, _ _--Yes---------- -------------------------- -_-----------_---------. --- 24 Adequate tankage-orreseryepit,_.._______________.-_-__... _--_-_Yes_--_-_-Nabors_9_ES,-_-_-.--_._-_______, - - - 25 Ifa-re-drill,has-a_10-403 for abandonment beenapproved___ --_--_-____ _-_- _NA-___-__1,ateralwel_Ibranch_______ ____________._____-__-_-_ ___-___-_--_--_---, 26 Adequatewellboreseparatjon-proposed-------- - ------ -- ~----Yes------ - --------- -- --- ---- - - - -- -- - - -- ------ - ---- 27 Ifdiverterrequired,doesitmeetregulations___-__________________ -___-_ NA___-_$idetrack._-___-__-__---._-_______----_-_-_---,----_--_.-_----_., Appr Date 28 Drillingfluid_programsehematic&equiplistadequate--__-_-____-___- -___-_Yes__-_-__MaXMW-9,5ppg,-__-______--_-.-___._-----------------___-___- WGA 10!1312005 29 BOPEs,-do they meetregu_lotion_--_________________________ _____Yes-__-__-__-- -_-___--__._--__-___---__,_--_-__.-___-__,__--_-__---_.__--- 30 BOPE_ptess rating appropriate; test to-(put prig in cemments)- - - _ - _ - - _ _ - _Yes _ - _ -Test to 3500 psi. _MSP 14.68 psi._ _ - _ _ - _ _ - _ _ _ - - _ - . - - _ - - , 31 Chgke_manifold complies wIAPI-RP-53 (May 84) - - - - Yes _ - - - - - - - - 32 Work willoccu[withoutoperationshutdown_______________ _ ___--Yes__-__-_.__--___-_.___ - - - - 33 Is presence ofH2Sgas-probable___-____-_____,------ , _ --No_.___-Not anH2Spad._._______-___-._---------------------------- 34 Mechanical condition of wells within AOR verified (FOr_service well onlya _ _ _ - - _ - - - . - tJA- _ - - - - - - - - Geology 35 Permit can be issued w!o hydrogen_sulfide measu[es - - _ - - . _ _ _ _ - - . _ - . _Yes . - _ - _ - _ _ - - - - _ - - - - - - -- - ~ - 36 Data_presentedonpotentialove_rpressurezones--__,_-_-__-__-___--_ ___._ NA_-_-___--_____-___--_-_- - - - Appr Date 37 SeismicanalysisofshalloWgas_zones_.___-_________ __________ ______ tJA-__-_____--__- --__- - - RPC 1011212005 38 Seabed condition suryey_(ifaff-shore) - _ _ _ - 39 _Contact na_melphone,forweeklyprogress_reports[exploratoryonly]_________ ______ NA__._-_.___----_-___-_-__-_-____-_-_-_,-_- __----___---.-_-_---__-__- Geologic ommissioner: C Engineering Date: Date i io is i C Date {1 1 CI ~ ~~ ~ I omm ss s ``(( n`]er/y,:~~7_ !/ p ('' ~ lI I ~ I1 ~?~~(~~ l~^f ~r U~ ~ ~ ~Q /~ O !/~ s t