Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout198-009MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Wednesday, July 24, 2024
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Adam Earl
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
R-32A
PRUDHOE BAY UNIT R-32A
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 07/24/2024
R-32A
50-029-22413-01-00
198-009-0
W
SPT
8625
1980090 2156
1126 1130 1138 1144
214 408 395 381
4YRTST P
Adam Earl
6/8/2024
MIT-IA
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UNIT R-32A
Inspection Date:
Tubing
OA
Packer Depth
809 2496 2464 2451IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitAGE240610075740
BBL Pumped:4 BBL Returned:4
Wednesday, July 24, 2024 Page 1 of 1
9
9
9
9
9
9
9 9
9 9 9
9 9
9 9
9
9James B. Regg Digitally signed by James B. Regg
Date: 2024.07.24 13:04:45 -08'00'
MEMORANDUM
TO: Jim Regg 1
P -I. Supervisor t, Zo w
FROM: Bob Noble
Petroleum Inspector
NON -CONFIDENTIAL
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, June 15, 2020
SUBJECT: Mechanical Integrity Tests
BP Exploration (Alaska) Inc.
R -32A
PRUDHOE BAY UNIT R -32A
See: Inspector
Reviewed By:
PS Supry TDr---�-
Comm
Well Name PRUDHOE BAY UNIT R -32A API Well Number 50-029-22413-01-00
Inspector Name: Bob Noble
Permit Number: 198-009-0
Inspection Date: 6/62020
Inap Num: mitRCN200606170036
Rel Insp Num:
Packer Depth Pretest Initial
15 Min 30 Min 45 Min 60 Min
Well
R -32A
IB*
w=
qVD
1625
Tubing
546
551 '
549'
549
PTD
9aoo90
1980090
'Type
ype
Test
sPr
Test psi
z1s6
IA
zoz
2490
2470
-
—2464
Pumped:
5.2 • BBL Returned:
52
OA
E263
527
515
505
Interval
4YRTST 1PIF P V
Notes:
Monday, June 15, 2020 Page I of 1
•
•
Injector R-32A(PTD# 1980090) TIO Plot 2016/08/16
Wcll R-q
3.000•
t Tb
1.000• OA
• ODA
On
1000.
0516'16 062106 0590116 06+0616 06'11'16 052016 0617116 •- 0'11,16 07/1616 0712546 0601,16 06006 061916
Injection Plot
woo P II
1.'00 5 000
660
„00 6680
6100
ac 000
000
5x
ISM
3600
1800
eou 3100
i
000 —563
00 00 —�
000
60 _
0 fi0P —[
IWO a
1.800
un 1 W
ID
1 100
1000
000 500
Ion
9
0516.16 05'636 063616 069616 003'16 '16 0tW,16 .006 9711'6 0?•'1616 07,2456 060116 060016 OYIb16
SCANNED JAN 1 8 2061
• •
Wallace, Chris D (DOA)
From: AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com>
Sent: Monday,July 18, 2016 10:57 AM
To: AK, GWO Projects Well Integrity
Cc: AK, GWO DHD Well Integrity;AK, GWO SUPT Well Integrity;Wallace, Chris D (DOA)
Subject: RE:Injector R-32A (PTD# 1980090) MIT-IA
Ryan,
Just spoke with Chris Wallace. We will not be required to re-test. He requested we send him an e-mail and a TIO plot in a
month's time,to verify that the pressure trends still look good and there are no anomalies.
We are good to bring the well online whenever Ops is ready to do so.
Thanks,
Adrienne
From: AK, GWO Projects Well Integrity
Sent: Friday, July 15, 2016 10:42 AM
To: AK, GWO SUPT Well Integrity
Cc: AK, GWO DHD Well Integrity
Subject: RE: Injector R-32A(PTD# 1980090) MIT-IA
Hi Adrienne,
Is there any update on this one for if we need to retest?Water will be back up around the 18th or 19th. Parts to repair the
header valves will be up tomorrow.
Thanks,
Ryan Hayes (Alt.Josh Murphy)
Well Integrity Engineer
BP Exploration (Alaska) Inc.
PBOC—A210
Office: (907) 659-5766
Cell: (206)999-6347 SCANNED DEC 0 . 2016
Harmony—2377
WO
global was oryrnUNrow
From: AK, GWO SUPT Well Integrity
Sent: Sunday, July 10, 2016 6:10 PM
To: AK, GWO Projects Well Integrity
Subject: FW: Injector R-32A(PTD# 1980090) MIT-IA
1
• •
From: AK, GWO SUPT Well Integrity
Sent: Friday, July 01, 2016 6:52 PM
To: 'chris.wallace@alaska.gov'
Cc: AK, GWO SUPT Well Integrity
Subject: Injector R-32A (PTD# 1980090) MIT-IA
Chris,
Reviewing agency witnessed MIT test forms for the month of June, R-32A passed an MIT-IA to 1991 psi on June 6th 2016.
However the correct test pressure should have been 2157 psi based on packer TVD of 8625'.The 48 month witnessed
test was due on June 20th 2015 but the well was shut in due to drill-by adjacent rig activity during that time frame.The
well was put on injection on May 29th 2016 and then shut in again June 24th 2016 for proration activity.
The plan forward is to put R-32A on produced water injection and perform MIT-IA as soon as thermally stable to satisfy
48 month testing requirements.
Please call with questions or concerns.
Ryan Holt
(/ (err:;ate: Lee Grey)
BP Alaska-Well Integrity
GVVGlobal W
Organizationells
Office: 907.659.5102
WIC Email:AKDCWellIntegrityCoordinator@bp.com
2
•
Wallace, Chris D (DOA)
From: AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com>
Sent: Friday,July 01, 2016 6:52 PM
To: Wallace, Chris D (DOA)
Cc: AK, GWO SUPT Well Integrity
Subject: Injector R-32A (PTD# 1980090) MIT-IA
Chris,
Reviewing agency witnessed MIT test forms for the month of June, R-32A passed an MIT-IA to 1991 psi on June 6th 2016.
However the correct test pressure should have been 2157 psi based on packer TVD of 8625'.The 48 month witnessed
test was due on June 20th 2015 but the well was shut in due to drill-by adjacent rig activity during that time frame.The
well was put on injection on May 29th 2016 and then shut in again June 24th 2016 for proration activity.
The plan forward is to put R-32A on produced water injection and perform MIT-IA as soon as thermally stable to satisfy
48 month testing requirements.
Please call with questions or concerns.
Ryan Holt
(Alter nate Lee Gve )
BP Alaska-Well Integrity
GVV
Global Wells
Organization
Office: 907.659.5102 a , r
WIC Email:AKDCWeIlIntegrityCoordinator(cabp.com acme) DECJ 152016
1
0 0
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday,June 13,2016
TO: Jim Regg V.17.14 61 t31,('
P.I.Supervisor SUBJECT:Mechanical Integrity Tests
BP EXPLORATION(ALASKA)INC.
R-32A
FROM: Jeff Jones PRUDHOE BAY UNIT R-32A
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry ��(.---
NON-CONFIDENTIAL Comm
Well Name PRUDHOE BAY UNIT R-32A API Well Number 50-029-22413-01-00 Inspector Name: Jeff Jones
Permit Number: 198-009-0 Inspection Date: 6/6/2016
Insp Num: mitJJ160608092802
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well R-32A - Type Inj W ITVD 8625 - Tubing! 779 • 780 - 779 . 774 •
PTD 1980090 - Type TestLSPT-ITest psi 2156 - IA 208 ( 2003 • 1996 -_ 1991• -
Interval 4YRTST 1P/F P ✓ OA i 404 595 • 579 . 567 - —
Notes: 1 well inspected,no exceptions noted.
SCANNED DEC 2 9 2016
Monday,June 13,2016 Page 1 of 1
• •
Wallace, Chris D (DOA)
From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com>
Sent: Monday, May 30, 2016 2:36 PM
To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M IL; AK, OPS GC2 Wellpad Lead; AK, OPS
Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations
Superintendent;AK, D&C Well Services Operations Superintendent; AK, RES GPB West
Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad RJ; Wallace, Chris D
(DOA)
Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer;AK,
OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Regg, James B (DOA); AK, D&C Well
Integrity Coordinator; Rupert, C. Ryan; Peru, Cale
Subject: OPERABLE:Injector R-32A (PTD #1980090) Post Drill-by
All,
Injector R-32A(PTD#1980090)was classified as Not Operable for R-16 drill-by. Drilling on R-16 is complete and
operations is ready for well to be placed on injection. Once on injection and stabilized, this well will require an updated
AOGCC MIT-IA. This well is now classified as Operable.
Thanks,
Jack Lau
(Alternate:Adrienne McVev)
BP Alaska Alaska -Well Integrity Superintendent
rJrg8nz9Dfln
W: 907.564.5102
C: 907.943.0296
H: x2376
SCANNED JUN 0 12016
Wallace, Chris D (DOA)
From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com>
Sent: Sunday, June 14, 2015 7:41 AM
To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M IL; AK, OPS GC2 Wellpad Lead; AK, OPS
Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team
Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr;
AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad RJ; Peru, Cale;Wallace, Chris D
(DOA)
Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C
Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R;
Regg, James B (DOA);Weiss, Troy D
Subject: NOT OPERABLE:Injector R-32A (PTD #1980090) Due for AOGCC MIT-IA
Attachments: image001.png
All,
Injector R-32A (PTD#1980090) is due for an AOGCC MIT-IA on June 20, 2015.The well will not be placed on injection for
the test before the due date. The well is reclassified as Not Operable until ready to be placed on injection and will be
added to the quarterly Not Operable Injector Report.
Please call with any questions or concerns.
SCANNED JUL 0 12015
Thank you,
Whitney Pettus
(Alternate:Kevin Parks)
BP Alaska-Well Integrity Coordinator
GVV
WIC Office: 907.659.5102
WIC Email: AKDCWelllntegrityCoordinator@BP.com
1
Wallace, Chris D (DOA)
From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com>
Sent: Sunday,April 12, 2015 6:42 PM
To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M IL;AK, OPS GC2 Wellpad Lead; AK, OPS
Prod Controllers; Cismoski, Doug A; Daniel, Ryan;AK, D&C Wireline Operations Team
Lead; AK, D&C Well Services Operations Team Lead;AK, RES GPB West Wells Opt Engr;
AK, RES GPB East Wells Opt Engr;Wallace, Chris D (DOA); AK, OPS Well Pad RJ; Peru,
Cale
Cc: AK, D&C Well Integrity Coordinator;AK, D&C DHD Well Integrity Engineer;AK, D&C
Projects Well Integrity Engineer;AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R;
Regg, James B (DOA)
Subject: OPERABLE:WAG Injector R-32A (PTD#1980090) MIT-IA Passed
Attachments: image001jpg; image002.png; R-32A Wellbore Schematic.pdf;Injector R-32A(PTD#
1980090)TIO plot 04-12-15.docx
All,
WAG Injector R-32A(PTD#1980090) showed signs of tubing x inner annulus communication.The well passed a
nonwitnessed MIT-IA on March 20, 2015. The well also passed a PPPOT-T and PPPOT-IC on April 12,2015. Subsequent
monitoring of the well has shown pressure fluctuations consistent with thermal and injection rate changes.The passing
MIT-IA indicates two competent barriers in the well. The well is reclassified as Operable.
A copy of the TIO plot and wellbore schematic have been included for reference.
Thank you,
Kevin Parks
(Alter nate Lauric Chinei J
BP Alaska-Well Integrity Coordinator
G1/VGlobal Wells
Organization SCANNED AFF 2 3 2015
Office: 907.659.5102
WIC Email:AKDCWeIllntegrityCoordinator@bp corn
From: AK, D&C Well Integrity Coordinator
Sent: Thursday, March 19, 2015 2:13 PM
To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski,
Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES
GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad RJ; Peru, Cale;
'chris.wallace@alaska.gov'; 'Regg, James B (DOA) (jim.regg@alaska.gov)'
Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer;
AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R
Subject: UNDER EVALUATION: WAG Inector R-32A (PTD #1980090) Suspected TxIA Diagnostics
All,
WAG Injector R-32A(PTD#1980090) has shown signs of anomalous inner annulus pressure trends while on water
injection.At this time,the well has been reclassified as Under Evaluation for additional diagnostics.
Plan Forward:
1. DHD: Perform MIT-IA to 2,500
2. DHD: Bleed down IA and obtain a BUR
3. WIE: Additional diagnostics as needed
A copy of the TIO plot and wellbore schematic have been included for reference.
Please call with any questions.
Thank you,
Laurie Climer
(_4Ite mute:Kevin Parks)
BP Alaska-Well Integrity Coordinator
GVVGlobalWells
Orgarnzatton
WIC Office: 907.659.5102
WIC Email: AKDCWeIIIntegrityCoordinator@BP.com
2
TREE= 5-1/2'5M CMI
WELLHEAD= 135/8"5M FMC St I NOTES:H2S READINGS AVERAGE 125 ppm
ACTUATOR= BAKER R-3 2 A WHRES A SSSV WHEN ON
MI.EN ON MI.WELL THERE ARE NO FLOW QUICOUPLINGS ON SWS NIP.
KB. ELEV=. 55.1' AT 2134'-WELL ANGLE>70°@ 11926'.
BF.ELEV= 20.3'
KOP= 781'
Max Angle= 99'0 12084' I I 2134' —I5-1/2"PKR SWS NIP,ID=4.562"
Datum MD= 11710'
Datum TV D= 8800'SS
13-3/8"CSG,68#, L-80,ID=12.415" H 3340' J�
I I 11408' —I5-1/2"PKR SWS NIP,ID=4.562"
TOP OF 3-1/2"LNR H 11441' _
S -- 11464' H9-5/8"X 5-1/2"TMJ HBBP HYDRO SET PKR
Minimum ID = 2.992" @ 11441'
TOP OF 3-1/2" LINER I I 11496' H5-1/2"PKR SWS NIP,ID=4.562"
I I 11514' H5-1/r'PKR SWN NIP,ID=4.455"
5-1/2"TBG, 17#,L-80, 0232 bpf, ID=4.892" —I 11528'1 / \ 11528' —15-1/2"WLEG
TOP OF 7"LNR --I 11521'
? H ELMD NOT LOGGED
9-5/8"CSG,47#, L-80, ID=8.681" —I 11674' • ,
MLLOI.JT WINDOW
11693'- 11698'
TOP OF WHIPSTOCK H 11695'1
111161.
16780' H3-1/2"HES BRIDGE PLUG
TOP OF CEMENT H 11743' IreAviveivave NIP11111111
7"LNR,26#, L-80, 0383 bpf,ID=6.276" —I 12135'_ \ 1 V
PERFORATION SUMMARY •
REF LOG GR/CCL ON 06/16/98
ANGLE AT TOP PERF:24°@ 11710' ? 10111
Note: Refer to Production DB for historical pert data
—
SIZE SPF INTERVAL Opn/Sgz DATE
2-1/2" r 6 11710- 11730 0 06/17/98 3-1/2"LNR,9.3#,L-80,.0087 bpf,ID=2.992" —I 16900'
2-1/2' ' 6 13126- 13146 0 03/17/98
2-1/2" r 6 13264- 13284 0 03/17/98
2-1/2" ' 6 13406- 13426 0 03/17/98
2-1/2" r 6 14164- 14184 0 03/17/98
2-1/2' ' 6 14306- 14326 0 03/17/98
2-1/2' r 6 15066- 15086 0 03/17/98
2-1/2' ' 6 16144- 16164 0 03/17/98
2-1/2" ' 6 16442- 16462 0 03/17/98
2-112' 6 16740- 16760 0 03/17/98
DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT
r 1993 ORIGINAL COMPLETION 02/15/11 MB/JMD ADDED SSSV SAFETY NOTE WELL: R-32A
03/17/98 SIDETRACK COMPLETION 01/18/12 TMN/JMD ADDEDH2S SAFETY NOTE _ PERMIT No: 198-0090
03/15/01 SIS-QAA CONVERTED TO CANVAS _ API No: 50-029-22413-01
03/16/01 SIS-CS FINAL SEC 32,T12N,R13E
03/02/02 RNI'TP CORRECTIONS BP Exploration(Alaska)
Injector R-32A(PTD#1980090)TIO plot 04-12-15
W iI R22
KC
2009
1500
—5—IA
COO OA
OOA
A-0001
Oe
I am
\
0112 011015 010015 020055 020015 00115 marls 310215 0099/10 0316'10 03031S 102015 ow*
Wallace, Chris D (DOA)
From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com>
Sent: Thursday, March 19, 2015 2:13 PM
To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M TL;AK, OPS GC2 Wellpad Lead;AK, OPS
Prod Controllers; Cismoski, Doug A; Daniel, Ryan;AK, D&C Wireline Operations Team
Lead;AK, D&C Well Services Operations Team Lead;AK, RES GPB West Wells Opt Engr;
AK, RES GPB East Wells Opt Engr;AK, OPS Well Pad RJ; Peru, Cale;Wallace, Chris D
(DOA); Regg,James B (DOA)
Cc: AK, D&C Well Integrity Coordinator;AK, D&C DHD Well Integrity Engineer;AK, D&C
Projects Well Integrity Engineer;AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R
Subject: UNDER EVALUATION:WAG Inector R-32A (PTD#1980090) Suspected TxIA Diagnostics
Attachments: image001 jpg; R-32A TIO 03-19-15.docx; R-32A Wellbore Schematic.pdf
All,
WAG Injector R-32A(PTD#1980090) has shown signs of anomalous inner annulus pressure trends while on water
injection. At this time,the well has been reclassified as Under Evaluation for additional diagnostics.
Plan Forward:
1. DHD: Perform MIT-IA to 2,500
2. DHD: Bleed down IA and obtain a BUR
3. WIE: Additional diagnostics as needed
A copy of the TIO plot and wellbore schematic have been included for reference.
Please call with any questions.
Thank you,
Laurie Climer 4
(Alternate:Kevin Parks)
BP Alaska-Well Integrity Coordinator
GINGIot�aIWel Is
Oiganizaron sale. VIVA.V 'A
WIC Office: 907.659.5102
WIC Email: AKDCWeIlIntegrityCoordinator@BP.com
1
TREE= 5-1/2'5M CMJ
W3LHEAD= 13-5/8 5M FMC .•Y NOTES:H2S READINGS AVERAGE 125 ppm
ACTUATOR= BAKER R-3 2A QUIRES A SSSV WHEN ON
MI.WHETHERE ARE NO ON MI.WELL FLOW COUPLINGS ON SWS NIP.
AT 2134'-WELL ANGLE>70°@ 11926'.
BF. ELEV= 20.3'
KOP= 781'
Max Angle= 99'@ 12084' I I 2134' —15-1/2"PKR SWS NIP, ID=4.562"
Datum MD= 11710'
Datum IVO= 8800'SS
13-3/8"CSG,68#, L-80,ID=12.415" H 3340'
I 1 11408' H5-1/2"PKR SWS NIP, ID=4.562"
TOP OF 3-1/2"LNR H 11441'
g Z\—I 11464' H9-5/8"X 5-1/2"TMJ HBBP HYDRO SET PKR
Minimum ID = 2.992" @ 11441'
TOP OF 3-1/2" LINER I I 11495' H5-1/2"PKR SWS NIP, ID=4.562"
I I 11514' H5-1/2"PKR SINN NIP,ID=4.455"
5-1/2"TBG, 17#,L-80, .0232 bpf,ID=4.892" —i 11528' - / \ 11528' —15-1/2"WLEG
TOP OF 7"LNR —1 11521' —
? H ELMD NOT LOGGED
9-5/8"CSG,47#, L-80, ID=8.681" —1 11674' • ,
ILLOUT WINDOW
TOP OF WHIPSTOCK —1 11695' 11693'- 11698'
'N..N. :1147,
16780' —3-1/2"HES BRIDGE PLUG
TOP OF CEMENT —1 11743' I1.1.1.1.1.1.171
66666661
7"LNR,26#, L-80, .0383 bpf,ID=6.276" —1 12135'
PERFORATION SUMMARY
REF LOG: GR/CCL ON 06/16/98
ANGLE AT TOP PERF: 24°@ 11710' ? —1 FISH
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/2" r 6 11710- 11730 0 06/17/98 3-1/2"LNR,9.3#,L-80,.0087 bpf,ID=2.992" —1 16900'
2-1/2' ' 6 13126- 13146 0 03/17/98
2-1/2' ' 6 13264- 13284 0 03/17/98
2-1/2' r 6 13406- 13426 0 03/17/98
2-1/2' IF 6 14164- 14184 0 03/17/98
2-1/2' r 6 14306- 14326 0 03/17/98
2-1/2" ' 6 15066- 15086 0 03/17/98
2-1/2' ' 6 16144- 16164 0 03/17/98
2-1/2' ' 6 16442- 16462 0 03/17/98
2-1/2" 6 16740- 16760 0 03/17/98
DATE REV BY COMMIENTS DATE REV BY COMMENTS PRUD-$OE BAY WIT
r 1993 ORIGINAL COMPLETION 02/15/11 MIB/JN/0 ADDED SSSV SAFETY NOTE WELL R-32A
03/17/98 SIDETRACK COMPLETION 01/18/12 TMWJMD ADDED H2S SAFETY NOTE PERMIT No: 198-0090
03/15/01 SIS-QAA CONVERTED TO CANVAS API No- 50-029-22413-01
03/16/01 SIS-CS FINAL SEC 32,T12N, R13E
03/02/02 RN/TP CORRECTIONS BP Exploration(Alaska)
Injector R-32A(PTD #1980090) TIO Plot 19 March 2015
Wei R-32
4.000
3.000
H-i-a
2.000- --4-OA
OOA
1.000- -+-000A
12/19/14 12126/14 01/02/115 01/09/15 01/16/15 01/23/15 01/30/15 0206'15 021315 0220115 0227115 0306'115 03113/15
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Wednesday, June 22, 2011
TO: Jim Regg �J
P.I. Supervisor � `[ q /( SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
R -32A
FROM: Bob Noble PRUDHOE BAY UNIT R -32A
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. Supry . 1(
NON CONFIDENTIAL Comm
Well Name: PRUDHOE BAY UNIT R - 32A API Well Number: 50 029 - 22413 - 01 - 00 Inspector Name: Bob Noble
Insp Num: mitRCN110621162456 Permit Number: 198 - 009 - Inspection Date: 6/20/2011
Rel Insp Num:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min_
I Wel R -3 Type Inj. W ' TVD 8625 ' IA 500 2400 - 2390 2385 -
P.T.D 1980090 TypeTest SPT I Test psi 2400 • OA 280 500 500 500
Interval 4YRTST p/F P - Tubing 650 650 650 650
Notes:
5} 2 l SZ
Wednesday, June 22, 2011 Page 1 of 1
~
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
July 10~ ZQ~~7 `~'4a•r.~~.l~~$ ~H~i/ aJ 1~1.. : j~U~1~J+
~~~ ~ ~ ~~~~
Mr. Tom Maunder ~ ~ ~ (il
Alaska Oil and Gas Conservation Commission ~ n/ ~ ~
333 West 7th Avenue ~ ~' ~
Anchorage, Alaska 99501 .~ Q •- ~~., ~'`
~ ~~
Subject: Corrosion Inhibitor Treatments of GPB R-Pad
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB R-
Pad that were treated with corrosion inhibitor in the surface casing by conductor
annulus. The corrosion inhibitor is engineered to prevent water from entering the
annular space and causing external corrosion that could result in a surface casing leak
to atmosphere. The attached spreadsheet represents the well name, API and PTD
numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in
each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Torin
Roschinger, at 659-5102.
Sincerely,
Anna Dube, P.E.
BPXA, Well Integrity Coordinator
! M
BP Exploration (Alaska ) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
R-pad
Date Revised 7/10/2009
Well Name
API #
PTD #
Initial top of
cement
Voi. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft na al
R-02 50029203540000 1781000 1.25 NA 1.25 NA 6.8 5/11 /2009
R-03A 50029203640100 1981710 1.5 NA 1.5 NA 7.65 5/13/2009
R-04 50029203740000 1790380 2.25 NA 2.25 NA 13.6 5/13/2009
R-05A 50029203800100 1972500 0 NA 0 NA 3 5/13/2009
R-06A 50029203880100 1981270 0.75 NA 0.75 NA 13.17 5/13/2009
R-07A 50029205230100 2000100 2.25 NA 2.25 NA 43 5/11/2009
R-08 50029205480000 1810010 0.25 NA 0.25 NA 1.7 6/12/2009
R-09A 50029206090100 1982330 3.25 NA 3.25 NA 17.85 5/14/2009
R-10 50029206180000 1810930 2 NA 2 IVA 14.5 6l22l2009
R-11 A 50029208930100 1982060 0.25 NA 0.25 NA 1.7 6/11 /2009
R-12 50029209210000 1830350 025 NA 0.25 NA 1.7 6/12/2009
R-13 50029209290000 1830440 24 NA 24 NA 96.9 6/23/2009
R-14 50029209090100 2021560 0 NA 0 NA 0.04 5/18/2009
R-15A 50029209170100 1990360 0 NA 0 NA 1.7 5/18/2009
R-16 50029206860000 1811740 15 NA 15 NA 107.5 5/17/2009
R-17A 50029206770100 1981380 4 NA 4 NA 272 5/15/2009
R-18B 50029206330200 1981190 6.75 NA 6.75 NA 48.87 5/15/2009
R-19A 50029206370100 1971710 8.5 NA 8.5 NA 67.48 5/17/2009
R-21 50029209970000 1831200 0.25 NA 0.25 NA 3.4 6/13/2009
R-22 50029210050000 1831280 0.5 NA 0.5 NA 4.3 6/12/2009
R-23A 50029210130100 1972020 2.25 NA 225 NA 16.2 6/12/2009
R-24 50029212320000 1842160 9.5 NA 9.5 NA 37.4 6/12/2009
R-25A 50029222780100 1972300 0 NA 0 NA 1.7 5/18/2009
R-26A 50029215470000 1860370 0.75 NA 0.75 NA 4.3 6/22/2009
R-27 50029215570000 1860510 0.25 NA 0.25 NA 1.7 6/11/2009
R-29 50029222750100 1971070 20 3.9 1.25 NA 11.05 5/14/2009
R-31A 50029222770100 2021500 1.5 NA 1.5 NA 8.5 5/11/2009
R-32A 50029224130100 1980090 0.75 NA 0.75 NA 8.5 6/11/2009
R-34 50029224080000 1931530 0 NA 0 NA 2.5 5/18/2009
R-35 50029224240000 1931810 0.25 NA 0.25 NA 1.7 5/11/2009
R-36 50029225220000 1941440 3.25 NA 3.25 NA 44.2 5/14/2009
R-39A 50029225260100 1960840 2 NA 2 NA 22.1 5/11/2009
R-40 50029229260000 1982000 1.5 NA 1.5 NA 6.8 5/14/2009
R-41 50029233990000 2081530 3.25 NA 3.25 NA 22.1 5/12/2009
r'1
LJ
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
June 26, 2009 ~
l~~"oa
Mr. Tom Maunder (~ . ~J ~~
Alaska Oil and Gas Conservation Commission `~'
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of R-Pad
Dear Mr. Maunder,
~
~~
~~ ~$ :
.u
-~;
JUL ~ ~ ~200~
~~~~k~ ~~~ ~ Gas Conxa Com~~si~~
~~c~or~
Enclosed please find a spreadsheet with a list of wells from R-Pad that were treated
with corrosion inhibitor in the surface casing by conductor annulus. The corrosion
inhibitor is engineered to prevent water from entering the annular space and causing
external corrosion that could result in a surface casing leak to atmosphere. The
attached spreadsheet represents the well name, top of cement depth prior to filling and
volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube,
at 659-5102.
Sincerely,
~,
`~~., "'~~~'~~%' ,,+U~. ~ ~ ~ ~~'~
Torin Roschinger
BPXA, Well fntegrity Coordinator
~ •
BP Exploration (Alaska ) Inc.
Surface Casing by Conductor Annutus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
Date
R-pad
6/25/2009
Well Name
PTD #
Initial top of
cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft na al
R-02 1781000 1.25 NA 1.25 NA 6.8 5/11/2009
R-03A 1981710 1.5 NA 1.5 NA 7.65 5/13/2009
R-04 1790380 2,25 NA 2.25 NA 13.6 5/13/2009
R-05A 1972500 0 NA 0 NA 3 5/13/2009
R-06A 1981270 0,75 NA 0.75 NA 13.17 5/13/2009
R-07A 2000100 2.25 NA 2.25 NA 43 5/11 /2009
R-OS 1810010 0.25 NA 0.25 NA 1.7 6/12/2009
R-09A 1982330 3.25 NA 3.25 NA 17.85 5/14/2009
R-10 1810930 2 NA 2 NA 14.5 6/22/2009
R-11A 1982060 0.25 NA 0.25 NA 1.7 6/11/2009
R-12 1830350 0.25 NA 0.25 NA 1.7 6/12/2009
R-13 1830440 3.75 NA 3.75 NA 76.5 6/22/2009
R-14 2021560 0 NA 0 NA 0.04 5/18/2009
R-15A 1990360 0 NA 0 NA 1.7 5/18/2009
R-16 1811740 15 NA 15 NA 107.5 5/17/2009
R-17A 1981380 4 NA 4 NA 27.2 5/15/2009
R-1 SB 1981190 6.75 NA 6.75 NA 48.87 5/15/2009
R-19A 1971710 8.5 NA 8.5 NA 67.48 5117/2009
R-21 1831200 0.25 NA 025 NA 3.4 6/13/2009
R-22 1831280 0.5 NA 0.5 NA 4.3 6/12/2009
R-23A 1972020 2.25 NA 2.25 NA 16.2 6l12/2009
R-24 1842160 9.5 NA 9.5 NA 37.4 6/12/2009
R-25A 1972300 0 NA 0 NA 1.7 5/18/2009
R-26A 1860370 0.75 NA 0.75 NA 4.3 6/22/2009
R-27 1860510 0.25 NA 0.25 NA 1.7 6/11/2009
R-29 1971070 20 3.9 1.25 NA 11.05 5/14/2009
R-31A 2021500 1.5 NA 1.5 NA 8.5 5/11/2009
R-32A 1960090 0.75 NA 0.75 NA 8.5 6/11/2009
R-34 1931530 0 NA 0 NA 2.5 5/18/2009
R-35 1931810 0.25 NA 0.25 NA 1.7 5/11 /2009
R-36 1941440 3.25 NA 3.25 NA 44.2 5/14/2009
R-39A 1960840 2 NA 2 NA 22,1 5/11 /2009
R-40 1982000 1.5 NA 1.5 NA 6.8 5/14/2009
R-41 2081530 3.25 NA 3.25 NA 22.1 5/12/2009
MEMORANDUM
TO:
.
State of Alaska
.
Alaska Oil and Gas Conservation Commission
Jim Regg r;) (I
P.I. Supervisor kí2ff I ì .0 7
DA TE: Tuesday, July 03, 2007
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
R-32A
PRUDHOE BAY UNIT R-32A
FROM:
John Crisp
Petroleum Inspector
Well Name: PRUDHOE SAY UNIT R-32A
Insp Num: mitJCr070701164759
Rei Insp Num:
Well i R-32A l!ype Inj. ! W
P.T.D, 1980090 I'TypeTest I SPT
I ---'-
Interval 4YRTST P/F
Packer
TVD
I
I
Test psi !
v
P
Src: Inspector
NON-CONFIDENTIAL
API Well Number: 50-029-22413-01-00
Permit Number: 198-009-0
Depth
8625
Pretest Initial
VIA I 130 I 2490
, I
I OA r------O-----¡-200
, I I
Tubin~~~. 850
-/'
2156.25
Notes: 5.4 bbl's pumped for test. No problems witnessed.
Tuesday, July 03, 2007
sCANNE.D JUL 2 0 2007
\ q'3-ooq
Reviewed BY.'
P.I. Suprv ::;j~fL
Comm
Inspector Name: John Crisp
Inspection Date: 6130/2007
15 Min. 30 Min. 45 Min. 60 Min.
.. 2460 I 2460! I
-------j- ! i~_
200 . i 180 ..L-..---t-~
875 ì 875 i !
Page 1 of 1
.
.
WELL LOG
TRANSMITTAL
ProActive Diagnostic Services, Inc.
To: AOOCC
Christine Mahnken
333 W. 7th Ave
Suite 100
Anchorage, Alaska 99501
(907) 79~1225
RE : Cased Hole/Open Hole/Mechanical Logs and / or Tubing Inspection(Caliper / MTT)
The technical data listed below is being submitted herewith. Please acknowledge receipt by
retuming a signed copy of this transmittal letter to the attention of :
ProActive Diagnostic Services. Inc.
Attn: Robert A. Richey
130 West International Airport Road
Suite C
Anchorage, AI< 99518
Fax: (907) 245-8952
1 8L / EDE Disk
R - 32A1
Injection Profile
06-Jun-07
1)
2)
3)
4)
5)
6)
7)
SCANNED JUL 0 5 2007
u:r.~ \C\1r -c:;¡:F\ st 'l5;;)5"""<{
RECE'VEC~
Signed:
0-1Ý/\-
Date :
Alaska Oil & Gas Cons. eommission
Anchorage
JUL 0 2 Z007
Print Name:
.QÞ, J\~-h. \A t!'!. ^^"-I A IA ({ ~..A
PRoAcTIVE DIAGNOSTIC SERVICES, INc., 130 W. INTERNATIONAL AIRPORT AD SUITE C, ANCHORAGE, AI( 99518
PHONE: (907)245-8951 FAX: (907)245~952
E-MAIL: PDSANCHORAGE@MEMORYLOG.COM
WEBSITE: WWW.MEMORYLOG.COM
D:IMasœr_ Copy _00 ]DSANC-2OxxIZ_ Word\Distribu1ion\TransmiltaC SheetslT1'8ns",iC Origina1.doc
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Randy Ruedrich
Commissioner
Regg
THRU: Jim .
P.I. Supervisor
DATE: July 8, 2003
SUBJECT: Mechanical Integrity Tests
BPX
Proudhoe Bay Field
R Pad
FROM: John Crisp
Petroleum Inspector
NON- CONFIDENTIAL
Prudhoe Bay Field
Packer Depth Pretest Initial 15 Min. 30 Min. I
we..I R-,,A IType,nj.I S I T.V.D. }8297 I Tub,ngl 95O I 950 I 950 I 950 I,nterva, I 4 I
P.T.D.I 1982060 ITypetestl P ITestpsil 2000 I Casingl 600 I 251O1 2460 I 2.450 I P/F I --P
I
Notes: OA pressure 0. 4.2 BBL's pumped.
I
Wel,I R-32A IType,nj.I Gi T.V.D.I ~4 ITu~,n~l ~zoo i~oo I ~oo Ilntervall 4 I
P.T.D.I 1980090 ITypetestl P ITestpsil 2000 I CasingI 180 I 25oo
I¢~'~1 246o1 P/F I P I
Notes: Pretest OA psi. 0 240 psi. during test. 5.9 BBL pumped "~-'~?
I
We,,I R-34 IType,nj.I S I T.V.D.I8603 ITubingl 750 I 750I ~o I,nterva, I 4 I
P.T.D.I 1931530ITypetestl P I Testpsil 2000 I CasingI 540 I 25001 2480 I 24801 P/F I PI
Notes: PeA pretest 220 psi. 540 psi. during test. 2.3 BBL pumped.
I
Well I Type Inj.
P.T.D. Type test
Notes:
P.T:D. I Type test
Notes:
Type INJ. Fluid Codes
F = FRESH WATER INJ.
G = GAS I NJ.
S - SALT WATER INJ.
N = NOT INJECTING
Type Test
M= Annulus Monitoring
P= Standard Pressure Test
R= Internal Radioactive Tracer Survey
A= Temperature Anomaly Survey
D= Differential Temperature Test
Test's Details
Interval
I= Initial Test
4= Four Year Cycle
V= Required by Variance
W= Test during Workover
O= Other (describe in notes)
M.I.T.'s performed: _3
Attachments:
Number of Failures: 0
Total Time during tests: 3 hr.
CC:
MIT report form
5/12/00 L.G.
SCANNED" AUG 0 ~. 2003
2003-0708_M IT_PBU_R-34_jc.xls
7/17/2003
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
Email to: Tom_Maunder@admin.state.ak.us; Bob_Fleckenstein@admin.state.ak.us; Jim_Regg@admin,state. ak.us
OPERATOR:
FIELD / UNIT / PAD:
DATE:
OPERATOR REP:
AOGCC REP:
BP Exploration (Alaska)Inc.
Prudhoe Bay / PBU / R-PAD
07/08/03
Pat Lattner
John Crisp
WelllR-1 lA
P.T.D.I1982060
Notes:
WellI R-32A
P.T.D.I1980090
Notes:
WellI R-34
P.T.D. I1931530
Notes:
WellI
P.T.D.I
N ores:
WellI
P.T.D.I
Notes:
Type test
Packer Depths (ft.)
MD/TVDI 9,783'I 8,297'
Test psiI 20741
Pretest Initial 15 Min. 30 Min.
TubingI 9501 9501 9501 9501 IntervaI 4
Casingl 6001 25101 24601 24501 P/FI .P.
I Typelnj'l P I Testpsil 21561 I Casi"~l 1801 25001 24701 24601 P/FI PI
Type test
I IntervaI 4 ]
I Typetesq P I Testpsil 21511 I Casin~l 540l 25001 24801 24801 P/FI PI
Type Inj
Type Inj.
Test Details:
4-year MITIA's
TYPE INJ Codes
F = Fresh Water Inj
G = Gas Inj
S = Salt Water Inj
N = Not Injecting
TYPE TEST Codes
M = Annulus Monitoring
P = Standard Pressure Test
R = Internal Radioactive Tracer Survey
A = Temperature Anomaly Survey
D = Differential Temperature Test
INTERVAL Codes
I = Initial Test
4 = Four Year Cycle
V = Required by Variance
T = Test during Workover
O = Other (describe in notes)
MIT Report Form
Revised: 06/19/02
2003-0708_MIT_PBU_R-34.xls
Emailing: MIT KRU 2nd qtr MITs for diagnostics.,~'
Subject: Emailing: MIT KRU 2nd qtr MITs for diagnostics.xls
Date: Sun, 6 Jul 2003 07:28:47 -0800
From: "NSK Problem Well Supv" <rtl 617~conocophillips.com>
To: bob_fleckenstein~admin.state.ak.us, tom_maundcr~admin.state.ak.us,
jim_regg~admin.stme.ak.us
CC: "nl 617" <nl 617~conocophillips.com>
Attached are results from a few MIT's completed for diagnostic reasons
during the month of June that have not previously been submitted for your
review.
3F-03 (PTD 1852270) - well was SI during for LDS replacement during regular
scheduled 4 year MIT's
1R-08 (PTD 1850730) - MITIA post braiden head work
3C-05 (PTD 1851540) - MITIA for diagnostics
Please call if you have any questions
Thanks
MJ Loveland
Problem Well Supervisor
ConocoPhillips Alaska Inc.
(907) 659-7224, 659-7043The message is ready to be sent with the following
file or link attachments:
MIT KRU 2nd qtr MITs for diagnostics.xls
Note: To protect against computer viruses, e-mail programs may prevent
sending or receiving certain types of file attachments. Check your e-mail
security settings to determine how attachments are handled.
(See attached file: MIT KRU 2nd qtr MITs for diagnostics.xls)
~[~MIT KRU 2nd qtr MITs for diagnostics.xls
Name: MIT KRU 2nd qtr MITs for diagnostics.xls
Type: EXCEL File (application/msexcel)
Encoding: base64
I of l 7/11/2003 1:55 P1
"--" STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _X Plugging _ Perforate _
SCHMOO'BE'GON E Pull tubing _ Alter casing _ Repair well _ Other_
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet)
BP Exploration (Alaska), Inc. Development__ RKB 48 feet
3. Address Exploratory__ 7. Unit or Property name
P. O. Box 196612 Stratigraphic._
Anchorage, AK 99519-6612 Sewice__X Prudhoe Bay Unit
4. Location of well at surface 8. Well number
4580' FNL, 4022' FEL, Sec. 32, T12N, R13E, UM (asp's 634908, 597717~3) R-32A
At top of productive interval'~ 9. Permit number / approval number
1816' FNL, 2674' FEL, Sec. 33, T12N, R13E, UM (asp's 641476, 5980059) '~ 198-009
At effective depth 10. APl number
4607' FNL, 4114' FEL, Sec. 27, T12N, R13E, UM (asp's 645261, 5982621) 50-029-22413-01
At total depth 11. Field / Pool
4603' FNL, 3996' FEL, Sec. 27, T12N, R13E, UM (asp's 645379, 5982627) Prudhoe Bay Field / Prudhoe Bay Pool
12. Present well condition summary
Total depth: measured 16900 feet Plugs (measured) ClBP Set @ 16780'
true vertical 8965 feet
Effective depth: measured 16780 feet Junk (measured)
true vertical 8982 feet
Casing Length Size Cemented Measured Depth True Vertical Depth
Conductor 110' 20" 260 sx Arctic Set (Aprox) 142' 142'
Surface 3306' 13-3/8" 1270 sx Coldset III, 375 3340' 2964'
sx Class 'G'
Intermediate 11642' 9-5/8" 1100 sx Class 'G' 11674' 8816'
Liner 174' 7" 170 SX Class 'G' 11521' - 11695' 8676' - 8835'
Sidetrack Liner 5472' 3-1/2" 314 sx Class 'G' 11428' - 16900' 8592'- 8965'
Perforation depth: measured Open Perfs 13126'-13146', 13264'-13284', 13406'-13426', 14164'-14184', 14306'-14326',
Open Perfs (continued) 15066'-15086', 16144'-16164', 16442'-16462', 16740'-16760'.
true vertical Open Perfs 8971'-8970', 8963'-8962', 8955'-8954', 8965'-8967', 8979'-8981',
Open Perfs (continued) 9020'-9022', 9027'-9027', 9014'-9012', 8986'-8984'.
Tubing (size, grade, and measured depth) 5-1/2", 17# L-80 TBG @ 11528' MD.
.. ~.c-~ ~_._
Packers & SSSV (type & measured depth) 9-5/8" x 5-1/2" TIW HBBP HYDRO SET Packer @ 11464'. ~ ~,--~%~lI
5-1/2" PKR SWS Nipple @ 2134' MD.
13. Stimulation or cement squeeze summary MAR 2 ;~ 2003
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure /~~
~ m= ·
14. Representative Daily Averaqe Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 02/19/2003 1495 1182
Subsequent to operation 02/23/2003 2282 1040
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run ~
Daily Report of Well Operations ~ Oil __ Gas ~ Suspended __ Service WAG INJECTOR
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Title: Technical Assistant Date February 28, 2003
DeWayne R. Sc norr Prepared b~ DeWa~ne R. Schnorr 564-5174
Form 10-404 Rev 06/15/88 ·
RBDNS BFL
ORIGINAL
SUBMIT IN DUPLICATE
R-32A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
02/21/2003 SCMOO-B-GONE--SBG: SCMOO-B-GONE
02/27/2003 TESTEVENT--- IN]ECTION PRESSURE, PSI: 929
BWPD.
TYPE: PW VOLUME: 863
EVENT SUMMARY
02/21/03
SCHMOO- B - GONE TREATMENT; PUMPED 365 BBL SCHMOO-B-GONE MIX
FROM WELLHEAD, 5 BBL MEOH FP (3 HOUR SOAK) 234 BBL SEAWATER
FLUSH, 5 BBL MEOH FP. LEFT SHUT IN FOR 3 HOUR SOAK, PO WILL PUT
WELL BACK ON INJECTION.
02/2W03
TESTEVENT--- IN3ECTION PRESSURE, PSI: 929 TYPE: PW VOLUME: 863
BWPD.
Fluids Pumped
BBLS
10 NEAT METHANOL
234 140 DEGREE SEAWATER
365 160 DEGREE 17% SCHMOO-B-GONE MIX
609 TOTAL
Page I
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrle
NO. 11445
Company:
Field:
Alaska OII & Gas Cons Comm
Attn: Lorl Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
Well Job # Log Description Date BL RF Sepia LIS Tape
C' 10 PRODUCTION PRORLE 9 80809 I 1
G-16 pRoDUCTION PRORLE 980705 I 1
G-16 PRODUCTION PROFILE ' 980726 I 1
,
H-31 (~/C.. INJECTION PROFILE ...... 980610 I 1
IN-09 PRODUCTION PROFILE W/DEFT 980704 I 1
Q-03A STATIC PRESSURE SURVEY 980629 I I
,
! R - 12 PRODUCTION PROFILE 980811 1 1
R - 12 PRODUCTION PROFILE 980811 I 1
R,32A IA.t C... INJECTION PROFILE 980701 I 1
!W-03 A (.X.I C. INJECTION PROFILE . 980723 I .!
W-8 GAS LIFT SURVEY 9 8 0 715 1 1
W- 23 GAS LIFT SURVEY 9 80 714 I 1
Y-09A GAS LIFT SURVEY 980711 1 1
,
Y-32 RST 980409 1 1
Z-03 PRODUCTION LOG 9 80 814 1 1
Z-03 GAS LIFT SURVEY 9 8 0 814 I 1
, ,
'Z-29 PRODUCTION LOG 9 8 0 72 0 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH
8/19/98
BP Exploration (Alaska) Inc.
Petmtectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
RECEIVED
AUG 2 0 1998
Naska 0~i & Gas Cons. Coremission
Anehnmn~
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
.~ STATE OF ALASKA -.~_~. ?t~' ~": ~"*
ALASKA OIL AND GAS CONSERVATION COMMISSION !'~ iL~ V ~ ~ ~..:-
WELL COMPLETION OR RECOMPLETION REPORT AND LOG,
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service Water Injeo. t.~.Bk..9. 0ii ~ ~?, C0,r.'S. C0i-.rii¥~i$~i0
2. Name of Operator 7. Permit Number
BP Exploration (Alaska)Inc. 98-09
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22413-01
4. Location of well at surface ~'"'"--"'"'~ 9. Unit or Lease Name
699' NSL, 1258' EWL, SEC. 32, T12N R13E, UM ?';~:.i;':?ii;.'7:7 ;-!
, - · Prudhoe Bay Unit
At top of productive interval ! ?~/L/'~,,I ~! ~. 10. Well Number
3463' NSL, 2606' EWL, SEC. 33, T12N, R13E, UM , R-32Ai
At total depthi.? '-j~:_~'~,:;i~:,~___
Field
and
Pool
684' NSL, 1266' EWL, SEC. 27, T12N, R13E, UM ~:,;.; ..... ~..
Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designati0'n and Serial No. Poop
KBE = 48.13'I ADL 028278
2/13/98 3/10/98 3/24/98 N/A ~$t_ One
17. Total Depth (MD+IVD) 18. ~lu~ Back Depth (MD+IVD)I19. Directional Survey 120. Depth where SSS¥ set121. Thickness o* Permafrost
16900 8965 Pr 16833 8975 PrI [~]Yes I~NoI (Nipple) 2134' MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, RES/AlT, DT/BHC, CNL, LDL, GR, Caliper, SP, MRES, CBL
23. CASING, LINER AND CEMENTING RECOR~
CASING SE'FI'lNG DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORDI AMOUNT PULLED
20" 91.5# H-40 32' 110' 30" 260 SX Arctic Set (Approx.)
13-3/8" 68# NT-80 34' 3340' 16" 1270 sx Coldset III, 375 sx Class 'G'
9-5/8" 47# L-80 32' 11674' 12-1/4" 1100 sx Class 'G'
7" 26# L-80 11521' 11695' 8-1/2" 170 sx Class 'G'
3-1/2" 9.3# L-80 11428' 16900' 4-1/2" ~14 sx Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
2-1/2" Gun Diameter, 6 spf 5-1/2", 17#, L-80 11529' 11464'
MD TVD MD TVD
13126' - 13146' 8971' - 8970'
13264' - 13284' 8963' - 8962' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
13406' - 13426' 8955' - 8954' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
14164' - 14184' 8965' - 8967'
14306' - 14326' 8979' - 8981' 16780' 3-1/2" H.E.S. Bridge Plug
15066' - 15086' 9020' - 9022' Freeze Protect with 50 Bbls of Diesel
16144' - 16164' 9027' - 9027'
16442' - 16462' 9014' - 9012'
16740' - 16760' 8986' - 8984'
27. PRODUCTION TESTORI , NAL
Date First Production I Method of Operation (Flowing, gas lift, etc.) ' ~
April 1, 1998I Water Injection
Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE IGAs-OIL RATIO
TEST PERIOD
1
Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAvITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
Sag River 11689' 8830'
Shublik A 11740' 8875'
Shublik B 11785' 8910'
Shublik C 11820' 8935'
Top of Sadlerochit 11834' 8945'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby c~,~tifY that the foregoi~ is true and correct to the best of my knowledgesigned ~.,,~ _ .'_'~"~ d/~'<:~
Ja~~ ~.~:r',7,,,~'~-'''~ Title Senior Drilling! Engineer Date
e ~-32Ai Prepared By Name/Number: Terrie Hubble, 564-4628
98-09
II Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1.' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL)or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27.' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Facility
PB R Pad
Progress Report
Well R-32A Page 1
Rig Doyon 16 Date 02 April 98
Date/Time
06 Feb 98
07 Feb 98
08 Feb 98
09 Feb 98
10 Feb 98
11 Feb 98
12 Feb 98
14:01-15:30
15:30-16:30
16:30-18:00
18:00-20:00
20:00-23:30
23:30-01:00
01:00-02:30
02:30-03:30
03:30-06:00
06:00-09:00
09:00-14:00
14:00-15:00
15:00-17:00
17:00-20:30
20:30-22:00
22:00-00:00
00:00-02:00
02:00-05:00
05:00-06:00
06:00-07:00
07:00-08:00
08:00-11:00
11:00-18:00
18:00-18:30
18:30-22:00
22:00-23:00
23:00-01:30
01:30-05:00
05:00-06:00
06:00-08:30
08:30-09:30
09:30-16:00
16:00-16:30
16:30-17:30
17:30-20:30
20:30-01:00
01:00-01:45
01:45-05:00
05:00-06:00
06:00-06:30
06:30-07:30
07:30-12:00
12:00-14:00
14:00-21:30
21:30-22:00
22:00-04:00
04:00-06:00
06:00-10:00
10:00-10:30
10:30-16:00
16:00-23:30
23:30-01:00
01:00-06:00
06:00-06:15
Duration
1-1/4 hr
1 hr
1-1/2 hr
2 hr
3-1/2 hr
1-1/2 hr
1-1/2 hr
lhr
2-1/2 hr
3hr
5hr
lhr
2hr
3-1/2 hr
1-1/2 hr
2 hr
2hr
3 hr
lhr
1 hr
lhr
3 hr
7 hr
1/2 hr
3-1/2 hr
1 hr
2-1/2 hr
3-1/2 hr
1 hr
2-1/2 hr
1 hr
6-1/2 hr
1/2hr
1 hr
3 hr
4-1/2 hr
3/4 hr
3-1/4 hr
1 hr
1/2 hr
1 hr
4-1/2 hr
2hr
7-1/2 hr
1/2 hr
6hr
2hr
4 hr
1/2 hr
5-1/2 hr
7-1/2 hr
1-1/2 hr
5 hr
1/4 hr
Activity
Rig moved 10.00 %
Rig moved 40.00 %
Installed BOP stack
Rig moved 100.00 %
Fill pits with Seawater
Removed Hanger plug
Installed Hanger plug
Removed Xmas tree
Installed BOP stack
Rigged up BOP stack
Tested BOP stack
Removed Bell nipple
Rigged down Kelly
Removed Hanger plug
Installed Hanger plug
Removed BOP stack
Rigged up Kelly
Installed BOP stack
Removed Hanger plug
Installed Bell nipple
Installed Wear bushing
Installed Undereamer
Ran HWDP to 6000.0 ft (2-7/8in OD)
Held safety meeting
Ran Drillpipe to 9000.0 ft (2-7/8in OD)
Rigged up Kelly
Tested Kelly
Ran Drillpipe to 11739.0 ft (2-7/8in OD)
Functioned Undereamer
Functioned Undereamer
Circulated at 11749.0 ft
Pulled Drillpipe in stands to 662.0 ft
Held drill (Kick (well kill))
Pulled Drillpipe in stands to 0.0 ft
Conducted electric cable operations
Conducted electric cable operations
Conducted electric cable operations
Conducted electric cable operations
Rigged up sub-surface equipment - Downhole tools
Held safety meeting
Rigged up sub-surface equipment - Mud motor
Ran Drillpipe in stands to 11508.0 ft
Worked toolstring at 11508.0 ft
Pulled Drillpipe in stands to 0.0 ft
Rigged up sub-surface equipment - Downhole tools
Ran Drillpipe in stands to 11508.0 ft
Functioned Downhole tools
Functioned Downhole tools
Ran Drillpipe in stands to 11692.0 ft
Functioned Mud motor
Pulled Drillpipe in stands to 0.0 ft
Installed Mud motor
Ran Drillpipe in stands to 11600.0 ft
Ran Drillpipe in stands to 11665.0 ft (cont...)
Progress Report
Facility PB R Pad
Well R-32A
Rig Doyon 16
Page 2
Date 02 April 98
Date/Time
06:15-10:00
10:00-23:30
23:30-01:00
13 Feb 98 01:00-06:00
06:00-06:15
06:15-07:30
07:30-10:30
10:30-14:30
14:30-15:30
15:30-18:00
18:00-06:00
14 Feb 98 06:00-15:00
15:00-15:30
15:30-18:00
18:00-18:30
18:30-21:00
21:00-23:00
23:00-23:30
23:30-23:45
23:45-03:30
15 Feb 98 03:30-04:00
04:00-06:00
06:00-06:30
06:30-07:30
07:30-11:00
11:00-17:00
17:00-18:30
18:30-19:30
19:30-01:00
16 Feb 98 01:00-02:30
02:30-03:30
03:30-05:00
05:00-06:00
06:00-06:30
06:30-11:00
11:00-11:30
11:30-12:30
12:30-00:30
17 Feb 98 00:30-01:30
01:30-06:00
06:00-06:30
06:30-07:00
07:00-08:00
08:00-09:00
09:00-09:30
09:30-15:00
15:00-16:00
16:00-17:30
17:30-18:00
18:00-18:30
18:30-06:00
18 Feb 98 06:00-07:30
07:30-13:00
13:00-14:00
Duration
3-3/4 hr
13-1/2 hr
1-1/2 hr
5hr
1/4 hr
1-1/4 hr
3 hr
4hr
1 hr
2-1/2 hr
12hr
9hr
1/2 hr
2-1/2 hr
1/2 hr
2-1/2 hr
2 hr
1/2 hr
1/4 hr
3-3/4 hr
1/2 hr
2hr
1/2 hr
1 hr
3-1/2 hr
6 hr
1-1/2 hr
lhr
5-1/2 hr
1-1/2 hr
1 hr
1-1/2 hr
lhr
1/2 hr
4-1/2 hr
1/2 hr
lhr
12hr
lhr
4-1/2 hr
1/2 hr
1/2 hr
lhr
lhr
1/2 hr
5-1/2 hr
1 hr
1-1/2 hr
1/2 hr
1/2 hr
11-1/2 hr
1-1/2 hr
5-1/2 hr
lhr
Activity
Functioned Downhole tools
Functioned Mud motor
"--~Circulated at 11705.0 ft
Pulled Drillpipe in stands to 0.0 ft
Held safety meeting
Rigged down sub-surface equipment - Downhole tools
Made up BHA no. 1
R.I.H. to 8700.0 ft
Serviced Block line
· R.I.H. to 11705.0 ft
Drilled to 11974.0 fi
Drilled to 12110.0 fi
Circulated at 12110.0 ft
Pulled out of hole to 7460.0 ft
Held safety meeting
Pulled out of hole to 1031.0 ft
Pulled BHA
Retrieved B ore protector
Installed BOP test plug assembly
Tested BOP stack
Installed Bore protector
Made up BHA no. 2
Made up BHA no. 2
Pulled BHA
Made up BHA no. 2
R.I.H. to 12110.0 ft
Drilled to 12115.0 fi
Circulated at 12115.0 ft
Pulled out of hole to 748.0 ft
Pulled BHA
Serviced Drillfloor / Derrick
Made up BHA no. 3
R.I.H. to 1500.0 fi
Held safety meeting
R.I.H. to 11680.0 fi
Set tool face
R.I.H. to 12115.0 fi
Drilled to 12369.0 ft
Circulated at 12369.0 ft
Pulled out of hole to 1600.0 fi
Held safety meeting
Pulled out of hole to 748.0 ft
Pulled BHA
Made up BHA no. 4
Tested MWD - Via string
R.I.H. to 11673.0 fi
Serviced Block line
R.I.H. to 12276.0 ft
Serviced Mud pumps
Reamed to 12369.0 ft
Drilled to 12700.0 fi
Circulated at 12700.0 ft
Pulled out of hole to 900.0 ft
Pulled BHA
Facility
PB R Pad
Progress Report
Well R-32A
Rig Doyon 16
Page
Date
3
02 April 98
Date/Time
19 Feb 98
20 Feb 98
21 Feb 98
22 Feb 98
23 Feb 98
14:00-14:30
14:30-15:00
15:00-18:00
18:00-18:30
18:30-20:30
20:30-21:00
21:00-23:30
23:30-05:00
05:00-06:00
06:00-08:00
08:00-10:30
10:30-11:00
11:00-11:30
11:30-18:45
18:45-22:00
22:00-22:15
22:15-22:30
22:30-22:45
22:45-00:30
00:30-06:00
06:00-07:00
07:00-08:30
08:30-12:30
12:30-15:00
15:00-17:00
17:00-00:00
00:00-01:30
01:30-02:00
02:00-03:00
03:00-06:00
06:00-06:30
06:30-12:00
12:00-14:00
14:00-21:00
21:00-22:00
22:00-23:00
23:00-04:30
04:30-05:30
05:30-06:00
06:00-07:00
07:00-08:00
08:00-19:30
19:30-20:00
20:00-20:30
20:30-21:30
21:30-02:30
02:30-03:00
03:00-04:00
04:00-06:00
06:00-06:30
06:30-10:00
10:00-11:00
11:00-18:00
18:00-18:30
Duration
1/2 hr
1/2 hr
3hr
1/2 hr
2 hr
1/2 hr
2-1/2 hr
5-1/2 hr
lhr
2hr
2-1/2 hr
1/2 hr
1/2 hr
7-1/4 hr
3-1/4 hr
1/4 hr
1/4 hr
1/4 hr
1-3/4 hr
5-1/2 hr
1 hr
1-1/2 hr
4hr
2-1/2 hr
2hr
7 hr
1-1/2 hr
1/2 hr
1 hr
3hr
1/2 hr
5-1/2 hr
2 hr
7hr
lhr
lhr
5-1/2 hr
1 hr
1/2 hr
lhr
1 hr
11-1/2 hr
1/2 hr
1/2 hr
1 hr
5 hr
1/2 hr
1 hr
2 hr
1/2 hr
3-1/2 hr
1 hr
7hr
1/2 hr
Activity
Made up BHA no. 5
Functioned downhole tools at 280.0 ft
R.I.H. to 7000.0 ft
Serviced Drillfloor / Derrick
R.I.H. to 11551.0 ft
Took MWD survey at 11551.0 ft
R.I.H. to 12228.0 ft
Pulled out of hole to 300.0 ft
Pulled BHA
Rigged up sub-surface equipment - HWDP
Worked toolstring at 0.0 ft
Rigged down Drillstring handling equipment
Worked toolstring at 489.0 ft
Worked toolstring at 12228.0 ft
Circulated at 12228.0 ft
Pumped Fresh water spacers - volume 5.000 bbl
Circulated at 122228.0 ft
Worked toolstring at 11760.0 ft
Circulated at 11760.0 ft
Worked toolstring at 1000.0 ft
Worked toolstring at 500.0 ft
Worked toolstring at 0.0 ft
Tested BOP stack
Made up BHA no. 6
Made up BHA no. 6
R.I.H. to 11690.0 ft
Circulated at 11690.0 ft
R.I.H. to 11793.0 ft
Circulated at 11793.0 ft
Drilled to 11800.0 ft
Serviced Drillfloor / Derrick
Drilled to 11879.0 ft
Circulated at 11879.0 ft
Pulled out of hole to -0.0 ft
Pulled BHA
Made up BHA no. 7
R.I.H. to 11650.0 ft
Serviced Draw works
R.I.H. to 11700.0 ft
R.I.H. to 11879.0 ft
Drilled to 11881.0 ft
Drilled to 12037.0 ft
Circulated at 12037.0 ft
Pulled out of hole to 11514.0 ft
Circulated at 11514.0 ft
Pulled out of hole to 300.0 ft
Pulled BHA
Made up BHA no. 8
R.I.H. to 4000.0 ft
Serviced Draw works
R.I.H. to 11690.0 ft
Washed to 12037.0 ft
Drilled to 12289.0 ft
Serviced Draw works
Progress Report
Facility PB R Pad
Well R-32A
Rig Doyon 16
Page 4
Date 02 April 98
Date/Time
18:30-06:00
24 Feb 98 06:00-08:30
08:30-18:00
18:00-19:00
19:00-20:00
20:00-06:00
25 Feb 98 06:00-18:30
18:30-20:00
20:00-20:30
20:30-22:30
22:30-06:00
26 Feb 98 06:00-06:30
06:30-08:30
08:30-10:30
10:30-14:00
14:00-16:00
16:00-18:00
18:00-18:30
18:30-21:30
21:30-22:00
22:00-01:30
27 Feb 98 01:30-06:00
06:00-10:00
10:00-16:00
16:00-17:00
17:00-18:00
18:00-18:30
18:30-18:45
18:45-19:00
19:00-19:30
19:30-00:30
28 Feb 98 00:30-01:00
01:00-02:00
02:00-06:00
06:00-06:30
06:30-18:00
18:00-18:15
18:15-18:30
18:30-20:30
20:30-03:00
01 Mar 98 03:00-04:00
04:00-05:30
05:30-06:00
06:00-06:30
06:30-12:00
12:00-12:30
12:30-14:00
14:00-20:00
20:00-22:00
22:00-05:00
02 Mar 98 05:00-06:00
06:00-06:15
06:15-06:30
06:30-08:00
Duration
11-1/2 hr
2-1/2 hr
9-1/2 hr
lhr
1 hr
10hr
12-1/2 hr
1-1/2 hr
1/2 hr
2 hr
7-1/2 hr
1/2 hr
2 hr
2hr
3-1/2 hr
2 hr
2 hr
1/2 hr
3hr
1/2 hr
3-1/2 hr
4-1/2 hr
4 hr
6hr
1 hr
1 hr
1/2 hr
1/4 hr
1/4 hr
1/2 hr
5hr
1/2 hr
lhr
4hr
1/2 hr
11-1/2 hr
1/4 hr
1/4 hr
2 hr
6-1/2 hr
lhr
1-1/2 hr
1/2 hr
1/2 hr
5-1/2 hr
1/2 hr
1-1/2 hr
6 hr
2hr
7hr
1 hr
1/4 hr
1/4 hr
1-1/2 hr
Activity
Drilled to 12573.0 ft
Drilled to 12700.0 ft
Drilled to 13173.0 ft
Pulled out of hole to 11750.0 ft
R.I.H. to 13173.0 ft
Drilled to 13457.0 ft
Drilled to 13939.0 ft
Circulated at 13939.0 ft
Pulled out of hole to 13850.0 ft
Circulated at 13939.0 fi
Pulled out of hole to 3000.0 ft
Serviced Draw works
Pulled out of hole to 200.0 ft
Pulled BHA
Tested BOP stack
Made up BHA no. 9
R.I.H. to 6000.0 ft
Serviced Draw works
R.I.H. to 11690.0 ft
Set tool face
R.I.H. to 13939.0 ft
Drilled to 13968.0 ft
Drilled to 14008.0 ft
Pulled out of hole to 200.0 ft
Pulled BHA
Made up BHA no. 10
Serviced Draw works
R.I.H. to 200.0 fi
Pulled BHA
R.I.H. to 136.0 ft
R.I.H. to 11677.0 ft
Set tool face
R.I.H. to 14008.0 ft
Drilled to 14022.0 ft
Serviced Draw works
Drilled to 14147.0 ft
Took MWD survey at 14147.0 ft
Held safety meeting
Circulated at 14147.0 ft
Pulled out of hole to 150.0 fi
Pulled BHA
Made up BHA no. 11
Functioned Drilling tool / logs
Serviced Draw works
R.I.H. to 11670.0 ft
Took MWD survey at 11670.0 ft
R.I.H. to 14147.0 ft
Drilled to 14498.0 ft
Circulated at 14498.0 ft
Pulled out of hole to 200.0 ft
Pulled BHA
Downloaded MWD tool
Held safety meeting
Made up BHA no. 12
Facility
Date/Time
03 Mar 98
04 Mar 98
05 Mar 98
06 Mar 98
07 Mar 98
08 Mar 98
PB R Pad
Progress Report
08:00-13:30
13:30-14:00
14:00-15:00
15:00-06:00
06:00-06:30
06:30-06:00
06:00-06:30
06:30-07:30
07:30-08:30
08:30-10:30
10:30-11:30
11:30-18:00
18:00-00:00
00:00-00:30
00:30-06:00
06:00-06:30
06:30-08:00
08:00-09:30
09:30-10:00
10:00-12:30
12:30-13:00
13:00-14:30
14:30-18:00
18:00-18:30
18:30-20:30
20:30-21:00
21:00-22:30
22:30-23:00
23:00-01:30
01:30-03:30
03:30-06:00
06:00-06:30
06:30-10:00
10:00-11:00
11:00-13:00
13:00-18:00
18:00-18:30
18:30-20:30
20:30-21:00
21:00-06:00
06:00-09:30
09:30-11:00
11:00-18:00
18:00-19:00
19:00-20:00
20:00-20:30
20:30-01:30
01:30-02:30
02:30-03:00
03:00-04:30
04:30-05:00
05:00-06:00
06:00-15:30
15:30-17:30
Duration
5-1/2 hr
1/2 hr
1 hr
15hr
1/2 hr
23-1/2 hr
1/2 hr
lhr
lhr
2hr
1 hr
6-1/2 hr
6hr
1/2 hr
5-1/2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
1/2 hr
2-1/2 hr
1/2 hr
1-1/2 hr
3-1/2 hr
1/2 hr
2hr
1/2 hr
1-1/2 hr
1/2 hr
2-1/2 hr
2hr
2-1/2 hr
1/2 hr
3-1/2 hr
1 hr
2hr
5hr
1/2 hr
2hr
1/2 hr
9 hr
3-1/2 hr
1-1/2 hr
7 hr
1 hr
lhr
1/2 hr
5hr
1 hr
1/2 hr
1-1/2 hr
1/2 hr
lhr
9-1/2 hr
2hr
Well R-32A
Rig Doyon 16
Activity
R.I.H. to 11677.0 ft
Took MWD survey at 11677.0 ft
R.I.H. to 14498.0 ft
Drilled to 14681.0 ft
Serviced Draw works
Drilled to 15280.0 ft
Held safety meeting
Drilled to 15303.0 ft
Circulated at 15303.0 ft
Pulled out of hole to 13775.0 ft
R.I.H. to 15303.0 ft
Drilled to 15375.0 ft
Drilled to 15621.0 ft
Circulated at 15621.0 ft
Pulled out of hole to 2200.0 ft
Held safety meeting
Pulled out of hole to 69.0 ft
Pulled BHA
Retrieved Bore protector
Tested BOP stack
Installed Bore protector
Made up BHA no. 13
R.I.H. to 9115.0 ft
Held safety meeting
R.I.H. to 11680.0 ft
Took MWD survey at 11680.0 ft
R.I.H. to 15618.0 ft
Took MWD survey at 15618.0 ft
Drilled to 15684.0 fi
Circulated at 15684.0 ft
Pulled out of hole to 11200.0 ft
Held safety meeting
Pulled out of hole to 70.0 fl
Pulled BHA
Made up BHA no. 14
R.I.H. to 11680.0 ft
Set tool face
R.I.H. to 15677.0 ft
Took MWD survey at 15677.0 ft
Drilled to 15848.0 ft
Drilled to 15910.0 ft
Circulated at 15910.0 ft
Pulled out of hole to 70.0 ft
Pulled BHA
Made up BHA no. 15
Tested MWD - Via string
R.I.H. to 11677.0 ft
Serviced Block line
Set tool face
R.I.H. to 15907.0 ft
Took MWD survey at 15907.0 ft
Drilled to 15974.0 fi
Drilled to 16241.0 fi
Circulated at 16241.0 ft
Page
Date
5
02 April 98
Facility
Date/Time
09 Mar 98
10 Mar 98
11 Mar 98
12 Mar 98
13 Mar 98
PB R Pad
Progress Report
Well R-32A Page 6
Rig Doyon 16 Date 02 April 98
Duration
Activity
17:30-20:00
20:00-20:30
20:30-02:30
02:30-03:00
03:00-03:30
03:30-04:30
04:30-05:00
05:00-06:00
06:00-06:30
06:30-10:30
10:30-11:00
11:00-13:00
13:00-13:30
13:30-06:00
06:00-11:00
11:00-12:30
12:30-15:00
15:00-16:30
16:30-19:00
19:00-04:30
04:30-05:30
05:30-06:00
06:00-07:00
07:00-08:00
08:00-10:30
10:30-17:00
17:00-18:00
18:00-18:30
18:30-20:00
20:00-22:00
22:00-00:00
00:00-05:00
05:00-06:00
06:00-06:30
06:30-07:00
07:00-09:30
09:30-10:00
10:00-11:30
11:30-15:30
15:30-16:30
16:30-18:00
18:00-18:30
18:30-23:30
23:30-00:30
00:30-05:00
05:00-06:00
06:00-07:30
07:30-09:30
09:30-14:30
14:30-18:00
18:00-18:30
18:30-19:30
19:30-21:30
21:30-22:30
2-1/2 hr
1/2 hr
6 hr
1/2 hr
1/2 hr
lhr
1/2 hr
1 hr
1/2 hr
4 hr
1/2 hr
2 hr
1/2 hr
16-1/2 hr
5hr
1-1/2 hr
2-1/2 hr
1-1/2 hr
2-1/2 hr
9-1/2 hr
1 hr
1/2 hr
1 hr
1 hr
2-1/2 hr
6-1/2 hr
1 hr
1/2 hr
1-1/2 hr
2hr
2 hr
5hr
lhr
1/2 hr
1/2 hr
2-1/2 hr
1/2 hr
1-1/2 hr
4hr
1 hr
1-1/2 hr
1/2hr
5 hr
lhr
4-1/2 hr
1 hr
1-1/2 hr
2 hr
5 hr
3-1/2 hr
1/2 hr
1 hr
2 hr
1 hr
Pulled out of hole to 11650.0 ft
Tested MWD - Via string
Pulled out of hole to 70.0 ft
Tested MWD - Via string
Pulled BHA
Made up BHA no. 16
Tested MWD - Via string
R.I.H. to 1250.0 ft
Held safety meeting
R.I.H. to 11660.0 ft
Set tool face
R.I.H. to 16220.0 ft
Took MWD survey at 16146.0 ft
Drilled to 16827.0 ft
Drilled to 16900.0 ft
Circulated at 16900.0 ft
Pulled out of hole to 11742.0 ft
R.I.H. to 16900.0 ft
Circulated at 16900.0 ft
Pulled out of hole to 70.0 ft
Pulled BHA
Rigged up Wireline units
Rigged up Wireline units
Rigged up sub-surface equipment - Formation logs
Rigged up sub-surface equipment - Formation logs
R.I.H. to 11576.0 ft
Installed Subs
Held safety meeting
Conducted electric cable operations
Tested Formation logs - Via string
Retrieved Downhole measurement tools
Pulled out of hole to 110.0 ft
Tested Formation logs - Via string
Held safety meeting
Retrieved B ore protector
Tested BOP stack
Installed Bore protector
Serviced Block line
Made up BHA no. 17
R.I.H. to 1850.0 ft
Pulled out of hole to 75.0 ft
Held safety meeting
R.I.H. to 11680.0 ft
Worked toolstring at 11693.0 ft
Pulled out of hole to 75.0 ft
Pulled BHA
Held safety meeting
Made up BHA no. 18
R.I.H. to 11683.0 ft
Milled Downhole equipment at 11691.0 ft
R.I.H. to 11874.0 ft
Reamed to 11874.0 ft
R.I.H. to 12219.0 ft
Circulated at 12219.0 ft
Facility
PB R Pad
Progress Report
Well R-32A Page 7
Rig Doyon 16 Date 02 April 98
Date/Time
14 Mar 98
15 Mar 98
16 Mar 98
17 Mar 98
18 Mar 98
22:30-04:00
04:00-05:00
05:00-06:00
06:00-06:30
06:30-13:30
13:30-14:00
14:00-15:30
15:30-16:30
16:30-18:00
18:00-18:30
18:30-00:00
00:00-00:30
00:30-02:00
02:00-06:00
06:00-06:30
06:30-14:30
14:30-15:30
15:30-18:00
18:00-18:30
18:30-00:30
00:30-01:30
01:30-06:00
06:00-07:00
07:00-13:00
13:00-16:00
16:00-16:30
16:30-18:00
18:00-18:30
18:30-20:00
20:00-21:00
21:00-01:00
01:00-02:00
02:00-06:00
06:00-06:30
06:30-08:00
08:00-09:00
09:00-10:00
10:00-17:00
17:00-18:00
18:00-18:30
18:30-22:00
22:00-23:00
23:00-00:30
00:30-02:00
02:00-05:00
05:00-06:00
06:00-06:30
06:30-14:00
14:00-14:30
14:30-15:30
15:30-18:00
18:00-18:30
18:30-20:30
20:30-06:00
Duration
5-1/2 hr
1 hr
1 hr
1/2 hr
7 hr
1/2 hr
1-1/2 hr
1 hr
1-1/2 hr
1/2 hr
5-1/2 hr
1/2 hr
1-1/2 hr
4 hr
1/2 hr
8hr
1 hr
2-1/2 hr
1/2 hr
6hr
1 hr
4-1/2 hr
1 hr
6 hr
3 hr
1/2 hr
1-1/2 hr
1/2 hr
1-1/2 hr
1 hr
4hr
1 hr
4 hr
1/2 hr
1-1/2 hr
lhr
1 hr
7 hr
1 hr
1/2 hr
3-1/2 hr
1 hr
1-1/2 hr
1-1/2 hr
3 hr
lhr
1/2 hr
7-1/2 hr
1/2 hr
lhr
2-1/2 hr
1/2 hr
2hr
9-1/2 hr
Activity
Pulled out of hole to 94.0 ft
Pulled BHA
Rigged up sub-surface equipment - Formation logs
Held safety meeting
R.I.H. to 11509.0 ft
Circulated at 11420.0 fl
Installed Cable head
Functioned Cable head
Retrieved Cable head
Held safety meeting
Pulled out of hole to 108.0 ft
Rigged down sub-surface equipment - Formation logs
Rigged up Casing handling equipment
Ran Liner to 1800.0 ft (3-1/2in OD)
Held safety meeting
Ran Liner to 5442.0 ft (3-1/2in OD)
Rigged up Tubing handling equipment
Ran Tubing to 1050.0 ft (2-1/16in OD)
Held safety meeting
Ran Tubing to 5353.0 ft (2-1/16in OD)
Ran Liner in stands to 5552.0 ft
Ran Liner in stands to 11670.0 ft
Circulated at 11670.0 ft
Ran Liner in stands to 16900.0 ft
Circulated at 16900.0 ft
Held safety meeting
Mixed and pumped slUlTy - 66.710 bbl
Functioned Tie back packer
Circulated at 16823.0 ft
Circulated at 16823.0 ft
Pulled Drillpipe in stands to 10871.0 ft
Rigged down Cement head
Laid down 2480.0 ft of 2-7/8in OD drill pipe
Held safety meeting
Laid down 4743.0 ft of 2-7/8in OD drill pipe
Rigged up Tubing handling equipment
Serviced Tubing handling equipment
Laid down 5353.0 ft of Tubing
Rigged up Wireline units
Held safety meeting
Conducted electric cable operations
Rigged down Wireline units
Tested Liner
Serviced Block line
Rigged up sub-surface equipment - Tie back packer
Ran Drillpipe in stands to 1500.0 fl
Held safety meeting
Ran Drillpipe in stands to 11440.0 ft
Installed Tie back packer
Tested Liner
Pulled Drillpipe in stands to 6800.0 ft
Held safety meeting
Pulled Drillpipe in stands to -0.0 ft
Singled in drill pipe to 5500.0 ft
Facility
PB R Pad
Progress Report
Well R-32A Page 8
Rig Doyon 16 Date 02 April 98
Date/Time
19 Mar 98
20 Mar 98
21 Mar 98
22 Mar 98
06:00-08:30
08:30-09:00
09:00-09:15
09:15-09:30
09:30-10:00
10:00-14:00
14:00-14:15
14:15-16:00
16:00-16:30
16:30-17:00
17:00-18:00
18:00-18:30
18:30-23:30
23:30-00:00
00:00-04:00
04:00-05:00
05:00-06:00
06:00-08:00
08:00-08:30
08:30-12:00
12:00-12:30
12:30-18:00
18:00-18:30
18:30-03:00
03:00-04:30
04:30-04:45
04:45-05:45
05:45-06:00
06:00-06:30
06:30-11:00
11:00-17:00
17:00-18:00
18:00-18:30
18:30-03:00
03:00-04:30
04:30-05:30
05:30-06:00
06:00-06:05
06:05-06:30
06:30-07:30
07:30-12:30
12:30-13:00
13:00-13:15
13:15-13:30
13:30-13:45
13:45-14:00
14:00-14:15
14:15-15:00
15:00-15:15
15:15-15:30
15:30-16:15
16:15-16:30
16:30-17:00
17:00-17:10
Duration
2-1/2 hr
1/2 hr
1/4 hr
1/4 hr
1/2 hr
4 hr
1/4 hr
1-3/4 hr
1/2 hr
1/2 hr
1 hr
1/2 hr
5hr
1/2 hr
4 hr
1 hr
1 hr
2hr
1/2 hr
3-1/2 hr
1/2 hr
5-1/2 hr
1/2 hr
8-1/2 hr
1-1/2 hr
1/4 hr
1 hr
1/4 hr
1/2 hr
4-1/2 hr
6 hr
1 hr
1/2 hr
8-1/2 hr
1-1/2 hr
1 hr
1/2 hr
0hr
1/4 hr
lhr
5hr
1/2 hr
1/4 hr
1/4 hr
1/4 hr
1/4 hr
1/4 hr
3/4 hr
1/4 hr
1/4 hr
3/4 hr
1/4 hr
1/2 hr
0 hr
Activity
Singled in drill pipe to 11492.0 ft (cont...)
Rigged up High pressure lines
Held safety meeting
Tested Liner - Via string
Tested Casing - Via annulus
Ran Drillpipe in stands to 16800.0 ft
Tested Liner - Via string
Tested Liner - Via annulus
Pulled Drillpipe in stands to 15775.0 ft
Tested Liner - Via annulus
Pulled Drillpipe in stands to 14000.0 ft
Held safety meeting
Pulled Drillpipe in stands to 5500.0 ft
Rigged up Tubing handling equipment
Laid down 3500.0 ft of Tubing
Monitor wellbore pressures
Laid down Tubing of 1300.0 fi
Laid down 1300.0 ft of Tubing (cont...)
Retrieved Wear bushing
Tested All functions
Installed Wear bushing
Singled in drill pipe to 5500.0 ft
Held safety meeting
Ran Drillpipe in stands to 16803.0 ft
Circulated at 16780.0 ft
Functioned Bridge plug
Tested Liner - Via annulus and string
Pulled Drillpipe in stands to 16000.0 ft
Held safety meeting
Pulled Drillpipe in stands to 5500.0 ft
Laid down 5500.0 ft of Tubing
Rigged up sub-surface equipment - TCP
Held safety meeting
Rigged up sub-surface equipment - TCP
Singled in drill pipe to 5500.0 fi
Rigged up sub-surface equipment - Retrievable packer
Ran Drillpipe in stands to 5800.0 ft
Ran Drillpipe in stands to 5800.0 ft (cont...)
Held safety meeting
Serviced Block line
Ran Drillpipe in stands to 16782.0 ft
Space out tubulars
Held safety meeting
Circulated at 13103.0 ft
Tested High pressure lines
Set packer at 11288.0 ft with 0.0 psi
Circulated at 13103.0 ft
Circulated at 13103.0 ft
Set packer at 11288.0 ft with 0.0 psi
Held safety meeting
Perforated
Packer worked at 11288.0 ft
Reverse circulated at 11288.0 fi
Packer worked at 11288.0 ft
Progress Report
Facility PB R Pad
Well R-32A Page 9
Rig Doyon 16 Date 02 April 98
Date/Time
17:10-18:15
18:15-18:45
18:45-00:00
23 Mar 98 00:00-00:30
00:30-04:00
04:00-05:00
05:00-06:00
06:00-06:05
06:05-06:30
06:30-15:00
15:00-16:00
16:00-16:30
16:30-17:00
17:00-18:00
18:00-18:30
18:30-21:00
21:00-22:30
22:30-23:30
23:30-00:30
24 Mar 98 00:30-01:30
01:30-03:30
03:30-06:00
06:00-07:30
07:30-10:00
Duration
lhr
1/2 hr
5-1/4 hr
1/2 hr
3-1/2 hr
I hr
1 hr
0hr
1/4 hr
8-1/2 hr
lhr
1/2 hr
1/2 hr
1 hr
1/2 hr
2-1/2 hr
1-1/2 hr
lhr
lhr
1 hr
2 hr
2-1/2 hr
1-1/2 hr
2-1/2 hr
Activity
Reverse circulated at 11288.0 ft
Flow check
Laid down 6000.0 ft of 2-7/8in OD drill pipe
Rigged down Kelly
Laid down 5300.0 ft of 2-7/8in OD drill pipe
Rigged down sub-surface equipment - Retrievable packer
Laid down Tubing of 500.0 ft
Laid down 500.0 ft of Tubing (cont...)
Held safety meeting
Laid down 4500.0 ft of Tubing
Held safety meeting
Retrieved Wear bushing
Installed Hanger plug
Rigged down All functions
Held safety meeting
Rigged down All functions
Installed Xmas tree
Retrieved Hanger plug
Circulated at -0.0 ft
Installed Hanger plug
Rigged down Drillfloor / Derrick
Rigged down Fluid system
Rigged down Fluid system (cont...)
Rig moved 10.00 %
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 1
SHARED SERVICES DRILLING
PBU / R-32A
500292241301
NORTH SLOPE BOROUGH
COMPUTATION DATE: 3/30/98
DATE OF SURVEY: 031098
MWD SURVEY
JOB NUMBER: AKMW80120
KELLY BUSHING ELEV. = 48.13 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
11828.24 8941.13 8893.00 48 49 N 59.77 E .00 2762.09N 6624.38E 7135.50
11859.84 8961.28 8913.15 51 55 N 56.19 E 13.10 2775.00N 6645.00E 7159.79
11894.12 8980.54 8932.41 59 45 N 63.97 E 29.54 2789.05N 6669.58E 7188.09
11925.65 8994.39 8946.26 68 4 N 66.58 E 27.44 2800.86N 6695.28E 7216.31
11957.37 9003.62 8955.49 78 4 N 63.31 E 33.03 2813.71N 6722.73E 7246.55
11989.18 9008.02 8959.89 86 0 N 55.90 E 33.93 2829.64N 6749.85E 7277.99
12021.68 9008.85 8960.72 91 4 N 45.86 E 34.60 2850.11N 6775.01E 7309.91
12052.00 9007.25 8959.12 94 58 N 39.93 E 23.38 2872.28N 6795.61E 7338.64
12083.61 9003.50 8955.37 98 37 N 33.32 E 23.75 2897.45N 6814.33E 7367.16
12115.13 8998.78 8950.65 98 36 N 30.88 E 7.65 2923.84N 6830.88E 7394.39
12146.64 8994.41 8946.28 97 19 N 31.29 E 4.26 2950.56N 6846.99E 7421.39
12178.16 8990.35 8942.22 97 27 N 31.89 E 1.93 2977.19N 6863.37E 7448.56
12209.72 8986.68 8938.55 95 52 N 32.09 E 5.05 3003.77N 6879.97E 7475.92
12241.27 8984.82 8936.69 90 53 N 33.18 E 16.19 3030.28N 6896.95E 7503.58
12272.90 8985.45 8937.32 86 49 N 34.10 E 13.16 3056.61N 6914.47E 7531.61
12304.32 8987.10 8938.97 87 10 N 33.74 E 1.58 3082.64N 6931.98E 7559.50
12335.71 8988.08 8939.95 89 13 N 33.60 E 6.58 3108.75N 6949.37E 7587.32
12367.30 8988.16 8940.03 90 29 N 33.12 E 4.27 3135.13N 6966.74E 7615.25
12398.93 8987.65 8939.52 91 20 N 34.18 E 4.32 3161.46N 6984.26E 7643.29
12430.73 8986.58 8938.46 92 29 N 34.13 E 3.59 3187.76N 7002.10E 7671.60
12462.32 8985.12 8936.99 92 49 N 35.06 E 3.13 3213.73N 7020.02E 7699.82
12493.71 8983.55 8935.42 92 53 N 33.74 E 4.20 3239.60N 7037.73E 7727.80
12525.34 8982.08 8933.95 92 27 N 33.11 E 2.41 3265.97N 7055.13E 7755.76
12556.82 8980.71 8932.58 92 31 N 33.65 E 1.72 3292.23N 7072.44E 7783.58
12588.61 8979.80 8931.67 90 44 N 34.74 E 6.57 3318.51N 7090.29E 7811.89
12619.67 8979.78 8931.65 89 20 N 36.41 E 7.00 3343.77N 7108.36E 7839.89
12651.44 8980.21 8932.08 89 6 N 38.89 E 7.84 3368.9tN 7127.76E 7869.01
12746.73 8980.51 8932.38 90 31 N 38.38 E 1.57 3443.34N 7187.25E 7957.00
12841.45 8980.27 8932.14 89 46 N 39.36 E 1.30 3517.08N 7246.69E 8044.62
12936.25 8979.51 8931.38 91 8 N 40.41 E 1.81 3589.82N 7307.47E 8132.93
13030.94 8976.61 8928.48 92 22 N 39.63 E 1.54 3662.29N 7368.33E 8221.18
13125.52 8971.35 8923.22 94 0 N 39.59 E 1.72 3735.04N 7428.53E 8308.98
13220.42 8965.98 8917.85 92 29 N 37.43 E 2.77 3809.17N 7487.52E 8396.40
13315.23 8960.51 8912.38 94 7 N 37.74 E 1.76 3884.17N 7545.24E 8483.12
13408.96 8954.90 8906.77 92 43 N 36.54 E 1.97 3958.75N 7601.72E 8568.55
RECEIVED
APR 0 3 998
BPXA PDC
ORIGINAL
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
PBU / R-32A
500292241301
NORTH SLOPE BOROUGH
COMPUTATION DATE: 3/30/98
DATE OF SURVEY: 031098
MWD SURVEY
JOB NUMBER: AKMW80120
KELLY BUSHING ELEV. = 48.13 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
13440.74 8953.52 8905.39 92 14 N 37.08 E 2.29 3984.16N 7620.75E 8597.47
13472.06 8952.49 8904.36 91 32 N 36.36 E 3.21 4009.25N 7639.46E 8625.96
13503.55 8952.73 8904.60 87 34 N 37.37 E 13.01 4034.44N 7658.35E 8654.64
13535.39 8954.15 8906.02 87 18 N 38.09 E 2.40 4059.60N 7677.81E 8683.82
13629.34 8960.06 8911.93 85 28 N 37.70 E 1.99 4133.58N 7735.40E 8769.93
13661.04 8962.46 8914.33 85 49 N 37.62 E 1.10 4158.60N 7754.71E 8798.91
13691.92 8963.92 8915.79 88 46 N 37.97 E 9.62 4182.98N 7773.61E 8827.22
13722.73 8964.34 8916.21 89 41 N 39.39 E 5.49 4207.02N 7792.86E 8855.67
13816.50 8963.61 8915.48 91 11 N 39.93 E 1.71 4279.20N 7852.70E 8942.89
13911.75 8960.72 8912.59 92 16 N 39.77 E 1.14 4352.29N 7913.71E 9031.57
13973.60 8958.49 8910.36 91 52 N 40.11 E .85 4399.68N 7953.39E 9089.17
14004.94 8957.61 8909.48 91 20 N 39.12 E 3.57 4423.81N 7973.36E 9118.30
14036.95 8957.61 8909.48 88 39 N 40.21 E 9.10 4448.45N 7993.79E 9148.08
14067.74 8958.52 8910.39 87 58 N 38.84 E 4.97 4472.19N 8013.38E 9176.68
14099.42 8959.77 8911.64 87 30 N 38.82 E 1.45 4496.85N 8033.22E 9205.95
14130.91 8961.79 8913.66 85 7 N 37.18 E 9.17 4521.61N 8052.57E 9234.84
14162.40 8965.00 8916.87 83 9 N 38.30 E 7.19 4546.38N 8071.74E 9263.57
14193.74 8968.58 8920.45 83 43 N 38.19 E 1.82 4570.83N 8091.01E 9292.24
14288.54 8977.71 8929.58 85 13 N 38.46 E 1.62 4644.85N 8149.52E 9379.18
14383.11 8984.78 8936.65 86 11 N 38.09 E 1.09 4718.88N 8207.94E 9466.04
14443.65 8988.37 8940.24 87 1 N 38.41 E 1.47 4766.34N 8245.35E 9521.69
14474.57 8989.70 8941.57 88 1 N 37.73 E 3.94 4790.65N 8264.40E 9550.10
14505.31 8990.75 8942.62 88 3 N 38.72 E 3.22 4814.79N 8283.40E 9578.38
14537.88 8991.85 8943.72 88 3 N 36.65 E 6.35 4840.54N 8303.30E 9608.23
14570.32 8992.70 8944.57 88 55 N 40.08 E 10.90 4865.97N 8323.42E 9638.11
14601.82 8993.55 8945.42 88 0 N 42.94 E 9.54 4889.54N 8344.29E 9667.76
14633.34 8994.34 8946.21 89 6 N 46.67 E 12.34 4911.90N 8366.49E 9697.98
14664.87 8994.84 8946.71 89 4 N 49.53 E 9.07 4932.95N 8389.95E 9728.69
14696.17 8995.80 8947.67 87 25 N 51.42 E 8.03 4952.85N 8414.08E 9759.42
14727.85 8996.17 8948.04 91 13 N 54.92 E 16.33 4971.84N 8439.43E 9790.78
14759.68 8995.47 8947.34 91 17 N 58.16 E 10.18 4989.38N 8465.97E 9822.49
14790.92 8995.39 8947.26 88 59 N 61.75 E 13.65 5005.02N 8493.01E 9853.72
14822.43 8996.33 8948.20 87 35 N 67.32 E 18.21 5018.55N 8521.43E 9885.15
14854.06 8997.35 8949.22 88 42 N 72.42 E 16.49 5029.43N 8551.10E 9916.39
14885.70 8998.10 8949.97 88 33 N 73.50 E 3.45 5038.70N 8581.34E 9947.35
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
SHARED SERVICES DRILLING
PBU / R-32A
500292241301
NORTH SLOPE BOROUGH
COMPUTATION DATE: 3/30/98
DATE OF SURVEY: 031098
MWD SURVEY
JOB NUMBER: AKMW80120
KELLY BUSHING ELEV. = 48.13 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
14917.30 8999.74 8951.61 85 30 N 73.86 E 9.72 5047.57N 8611.63E 9978.16
14948.95 9003.26 8955.13 81 41 N 74.83 E 12.42 5056.05N 8641.91E 10008.78
14980.61 9008.08 8959.95 80 48 N 74.67 E 2.89 5064.28N 8672.10E 10039.20
15012.18 9013.07 8964.94 81 1 N 75.23 E 1.89 5072.38N 8702.20E 10069.48
15043.69 9017.68 8969.55 82 8 N 73.47 E 6.57 5080.79N 8732.21E 10099.82
15075.39 9021.34 8973.21 84 35 N 72.90 E 7.93 5089.89N 8762.34E 10130.62
15106.99 9024.28 8976.15 84 44 N 74.20 E 4.12 5098.80N 8792.52E 10161.35
15138.63 9027.17 8979.04 84 46 N 73.21 E 3.12 5107.64N 8822.76E 10192.11
15169.69 9029.75 8981.63 85 41 N 73.10 E 3.01 5116.61N 8852.38E 10222.38
15201.35 9031.57 8983.44 87 43 N 74.52 E 7.82 5125.42N 8882.73E 10253.22
15232.97 9032.62 8984.49 88 27 N 74.72 E 2.39 5133.80N 8913.20E 10283.96
15264.76 9033.26 8985.13 89 13 N 74.06 E 3.19 5142.35N 8943.81E 10314.90
15296.07 9033.71 8985.58 89 6 N 74.20 E .59 5150.92N 8973.92E 10345.41
15327.59 9034.26 8986.13 88 53 N 74.42 E .99 5159.44N 9004.26E 10376.11
15359.25 9034.82 8986.69 89 4 N 76.51 E 6.63 5167.38N 9034.90E 10406.78
15390.54 9035.43 8987.30 88 40 N 77.73 E 4.10 5174.35N 9065.40E 10436.86
15421.79 9036.23 8988.10 88 24 N 81.10 E 10.82 5180.09N 9096.10E 10466.53
15453.36 9036.96 8988.83 88 57 N 85.62 E 14.42 5183.74N 9127.44E 10495.75
15485.07 9037.47 8989.34 89 11 N 86.37 E 2.48 5185.96N 9159.07E 10524.53
15516.67 9038.00 8989.87 88 51 N 87.32 E 3.19 5187.69N 9190.62E 10553.01
15548.17 9038.63 8990.50 88 51 N 85.84 E 4.70 5189.57N 9222.05E 10581.46
15580.53 9039.17 8991.04 89 13 N 86.93 E 3.56 5191.61N 9254.34E 10610.73
15612.13 9039.62 8991.49 89 8 N 87.53 E 1.92 5193.14N 9285.90E 10639.12
15642.53 9040.11 8991.98 88 59 N 87.64 E .61 5194.42N 9316.27E 10666.35
15674.22 9040.95 8992.82 88 0 N 84.35 E 10.84 5196.63N 9347.86E 10695.10
15705.77 9041.50 8993.37 90 0 N 83.93 E 6.48 5199.85N 9379.24E 10724.14
15737.36 9040.90 8992.77 92 10 N 84.19 E 6.95 5203.12N 9410.65E 10753.24
15769.16 9039.30 8991.17 93 34 N 83.66 E 4.68 5206.48N 9442.23E 10782.53
15800.76 9037.02 8988.89 94 43 N 83.41 E 3.72 5210.03N 9473.54E 10811.68
15832.75 9034.36 8986.23 94 48 N 83.41 E .28 5213.69N 9505.21E 10841.19
15861.52 9032.07 8983.94 94 18 N 83.34 E 1.75 5217.00N 9533.70E 10867.75
15895.12 9030.64 8982.51 90 34 N 85.07 E 12.23 5220.38N 9567.09E 10898.64
15926.90 9030.50 8982.37 89 56 N 84.66 E 2.39 5223.23N 9598.74E 10927.74
15958.44 9030.44 8982.31 90 15 N 84.89 E 1.22 5226.10N 9630.15E 10956.65
15989.47 9030.39 8982.26 89 56 N 83.89 E 3.37 5229.13N 9661.03E 10985.17
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
SHARED SERVICES DRILLING
PBU / R-32A
500292241301
NORTH SLOPE BOROUGH
COMPUTATION DATE: 3/30/98
DATE OF SURVEY: 031098
MWD SURVEY
JOB NUMBER: AKMW80i20
KELLY BUSHING ELEV. = 48.13 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
16021.16 9030.25 8982.13 90 33 N 84.78 E 3.40 5232.26N 9692.56E 11014.30
16052.35 9029.71 8981.58 91 26 N 85.03 E 2.96 5235.03N 9723.62E 11042.86
16083.76 9028.85 8980.72 91 41 N 87.75 E 8.70 5237.01N 9754.96E 11071.26
16115.26 9028.08 8979.95 91 6 N 87.11 E 2.76 5238.42N 9786.42E 11099.51
16146.80 9027.41 8979.28 91 19 N 87.95 E 2.74 5239.78N 9817.92E 11127.77
16175.41 9026.67 8978.54 91 39 N 86.35 E 5.72 5241.20N 9846.48E 11153.48
16210.43 9025.55 8977.42 92 0 N 87.36 E 3.04 5243.12N 9881.43E 11185.03
16242.01 9024.39 8976.26 92 12 N 87.23 E .78 5244.61N 9912.95E 11213.36
16273.53 9023.14 8975.01 92 20 N 87.62 E 1.30 5246.03N 9944.42E 11241.62
16305.64 9021.71 8973.58 92 44 N 86.46 E 3.82 5247.68N 9976.45E 11270.48
16337.37 9020.23 8972.10 92 38 N 87.61 E 3.63 5249.32N 10008.10E 11299.01
16369.12 9018.62 8970.49 93 10 N 87.55 E 1.68 5250.66N 10039.78E 11327.41
16400.70 9016.76 8968.63 93 34 N 87.01 E 2.13 5252.16N 10071.27E 11355.72
16432.48 9014.61 8966.48 94 10 N 88.05 E 3.79 5253.52N 10102.95E 11384.14
16464.28 9012.21 8964.08 94 30 N 88.70 E 2.27 5254.42N 10134.64E 11412.34
16495.90 9009.72 8961.59 94 31 N 88.77 E .23 5255.12N 10166.16E 11440.29
16527.57 9007.19 8959.06 94 39 N 88.13 E 2.06 5255.97N 10197.71E 11468.35
16559.21 9004.42 8956.29 95 21 N 88.00 E 2.25 5257.04N 10229.21E 11496.47
16590.83 9001.57 8953.44 95 0 N 89.00 E 3.34 5257.86N 10260.69E 11524.45
16622.54 8998.75 8950.62 95 10 N 88.91 E .58 5258.44N 10292.27E 11552.40
16654.30 8995.79 8947.66 95 32 N 89.22 E 1.52 5258.95N 10323.89E 11580.35
16686.07 8992.60 8944.47 95 59 N 89.67 E 2.00 5259.26N 10355.50E 11608.19
16717.48 8989.12 8940.99 96 42 N 88.63 E 4.01 5259.72N 10386.71E 11635.76
16748.06 8985.53 8937.40 96 47 N 89.41 E 2.55 5260.24N 10417.07E 11662.62
16779.63 8981.71 8933.58 97 5 N 88.21 E 3.89 5260.89N 10448.40E 11690.38
16810.75 8977.72 8929.59 97 40 N 88.89 E 2.86 5261.67N 10479.25E 11717.79
16847.63 8972.53 8924.40 98 30 N 87.76 E 3.79 5262.74N 10515.75E 11750.28
16900.00 8964.78 8916.65 98 30 N 87.76 E .00 5264.77N 10567.50E 11796.61
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 11806.35 FEET
AT NORTH 63 DEG. 31 MIN. EAST AT MD = 16900
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 61.19 DEG.
TIE-IN SURVEY AT 11,828.24' MD
WINDOW POINT AT 11,859.00' MD
PROJECTED SURVEY AT 16,900.00' MD
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA.
PAGE 5
SHARED SERVICES DRILLING
PBU / R-32A
500292241301
NORTH SLOPE BOROUGH
COMPUTATION DATE: 3/30/98
DATE OF SURVEY: 031098
JOB NUMBER: AKMW80120
KELLY BUSHING ELEV. = 48.13 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
11828.24 8941.13 8893.00
12828.24 8980.22 8932.09
13828.24 8963.36 8915.23
14828.24 8996.57 8948.44
15828.24 9034.74 8986.61
2762.09 N 6624.38 E
3506.87 N 7238.31 E
4288.20 N 7860.24 E
5020.75 N 8526.81 E
5213.17 N 9500.75 E
2887.11
3848.02 960.91
4864.88 1016.85
5831.67 966.80
6793.50 961.83
16828.24 8975.38 8927.25
16900.00 8964.78 8916.65
5262.01 N 10496.58 E
5264.77 N 10567.50 E
7852.86 1059.36
7935.22 82.37
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 6
SHARED SERVICES DRILLING
PBU / R-32A
500292241301
NORTH SLOPE BOROUGH
COMPUTATION DATE: 3/30/98
DATE OF SURVEY: 031098
JOB NUMBER: AKMW80120
KELLY BUSHING ELEV. = 48.13 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
11828.24 8941.13 8893.00
11838.65 8948.13 8900.00
11888.24 8977.52 8929.39
2762.09 N 6624.38 E 2887.11
2765.93 N 6631.08 E 2890.52 3.41
2786.78 N 6665.07 E 2910.72 20.21
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE i
SHARED SERVICES DRILLING
PBU / R-32APB1
500292241370
NORTH SLOPE BOROUGH
COMPUTATION DATE: 3/30/98
DATE OF SURVEY: 021998
MWD SURVEY
JOB NUMBER: AKMW80120
KELLY BUSHING ELEV. = 48.13 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
11683.63 8824.89 8776.76 24 0 N 69.70 E .00 2725.74N 6548.86E 7051.81
11693.00 8833.45 8785.32 23 58 N 69.79 E .42 2727.06N 6552.43E 7055.58
11734.08 8869.72 8821.59 31 53 N 65.95 E 19.76 2734.38N 6570.21E 7074.68
11766.08 8895.92 8847.79 38 5 N 63.95 E 19.70 2742.17N 6586.82E 7092.99
11796.68 8919.17 8871.04 42 57 N 62.49 E 16.15 2751.13N 6604.56E 7112.85
11828.24 8941.13 8893.00 48 49 N 59.77 E 19.63 2762.09N 6624.37E 7135.50
11859.84 8961.28 8913.15 51 55 N 56.19 E 13.10 2775.01N 6644.99E 7159.79
11891.31 8980.22 8932.09 54 4 N 53.35 E 9.95 2789.51N 6665.51E 7184.75
11922.82 8998.32 8950.19 55 49 N 51.13 E 8.01 2805.30N 6685.90E 7210.23
11954.21 9015.39 8967.26 58 15 N 47.62 E 12.16 2822.46N 6705.88E 7236.00
11985.72 9030.99 8982.86 62 25 N 44.31 E 16.05 2841.49N 6725.54E 7262.40
12017.30 9044.32 8996.19 67 38 N 42.36 E 17.45 2862.31N 6745.17E 7289.64
12048.82 9054.31 9006.18 75 21 N 40.76 E 24.96 2884.67N 6764.98E 7317.77
12077.01 9060.02 9011.89 81 16 N 40.20 E 21.06 2905.66N 6782.89E 7343.58
12108.32 9063.78 9015.65 84 55 N 39.42 E 11.95 2929.53N 6802.79E 7372.52
12139.65 9064.81 9016.68 91 17 N 36.64 E 22.15 2954.18N 6822.07E 7401.29
12171.17 9062.24 9014.11 98 4 N 34.94 E 22.17 2979.65N 6840.43E 7429.65
12202.88 9057.06 9008.93 ** 43 N 35.83 E 8.80 3005.15N 6858.54E 7457.81
12234.27 9051.27 9003.14 ** 34 N 37.95 E 6.65 3029.82N 6877.06E 7485.92
12265.73 9045.61 8997.48 ** 7 N 37.14 E 2.89 3054.36N 6895.92E 7514.27
12297.70 9039.89 8991.76 ** 30 N 37.65 E 1.97 3079.35N 6915.02E 7543.05
12334.27 9033.92 8985.79 98 15 N 37.70 E 6.15 3107.90N 6937.06E 7576.13
12364.96 9030.00 8981.87 96 26 N 35.90 E 8.28 3132.27N 6955.29E 7603.84
12396.49 9026.23 8978.10 97 16 N 36.63 E 3.50 3157.50N 6973.81E 7632.23
12427.60 9021.88 8973.75 98 47 N 35.74 E 5.62 3182.36N 6991.99E 7660.14
12458.98 9017.08 8968.95 98 47 N 37.33 E 5.01 3207.28N 7010.45E 7688.33
12491.37 9012.48 8964.35 97 33 N 36.43 E 4.71 3232.92N 7029.69E 7717.54
12522.78 9008.79 8960.66 95 56 N 36.09 E 5.21 3258.07N 7048.14E 7745.82
12554.38 9005.99 8957.86 94 13 N 35.96 E 5.49 3283.53N 7066.65E 7774.31
12585.70 9003.66 8955.53 94 18 N 34.80 E 3.70 3308.99N 7084.73E 7802.43
12617.20 9001.26 8953.13 94 25 N 34.65 E .63 3334.80N 7102.62E 7830.54
12648.26 8999.32 8951.19 92 45 N 35.53 E 6.10 3360.17N 7120.44E 7858.38
12700.00 8996.84 8948.71 92 45 N 35.53 E .00 3402.22N 7150.47E 7904.96
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 7918.61 FEET
AT NORTH 64 DEG. 33 MIN. EAST AT MD = 12700
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 61.19 DEG.
TIE-IN SURVEY AT 11,683.63' MD
WINDOW POINT AT 11,693.00' MD
PROJECTED SURVEY AT 12,700.00' MD
ORIGINAL
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
PBU / R-32APB1
500292241370
NORTH SLOPE BOROUGH
COMPUTATION DATE: 3/30/98
DATE OF SURVEY: 021998
JOB NUMBER: AKMW80120
KELLY BUSHING ELEV. = 48.13 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
11683.63 8824.89 8776.76
12683.63 8997.62 8949.49
12700.00 8996.84 8948.71
2725.74 N 6548.86 E
3388.92 N 7140.97 E
3402.22 N 7150.47 E
2858.74
3686.01 827.27
3703.16 17.16
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
SHARED SERVICES DRILLING
PBU / R-32APB1
500292241370
NORTH SLOPE BOROUGH
COMPUTATION DATE: 3/30/98
DATE OF SURVEY: 021998
JOB NUMBER: AKMW80120
KELLY BUSHING ELEV. = 48.13 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
11683.63 8824.89 8776.76
11709.34 8848.13 8800.00
11839.06 8948.13 8900.00
11863.63 8963.62 8915.49
2725.74 N 6548.86 E
2729.68 N 6559.11 E
2766.37 N 6631.43 E
2776.68 N 6647.47 E
2858.74
2861.21 2.47
2890.93 29.72
2900.01 9.08
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 111015
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
4/21/98
Well Job # Log Description Date BL RF Sepia LIS Tape
A-04 ~- '~'3~ Z~ 98187 RST 980406 I I 1
F-11 98065 CNL 970808 I I 1
K-05A 97522 PDK-100 971021 1
C- 16 TEMPERATURE LOG 980405 I 1
D- 25 PRODUCTION PROFILE 980322 1 1
G-03A FLOWING PRESSURE SURVEY 980401 I 1
H 29 A CALIPER LOG 980331 I 1
~1- 03 t.J. t ~-, INJECTION PROFILE 9 80 41 2 I 1
P-03A L~l (._. CEMENT MAP LOG 980318 I 1
R-32A LZ J (~ CEMENT MAP LOG 980317 I 1
S-21 PRODUCTION PROFILE 9 803 29 I 1
S-21 DEF]' 980329 I I
"-- q ~?- 0'10
-
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska)Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
Received b¢i~ ¢ _
WELL LOG TRANSMITTAL
To:
State of Alaska
.Alaska Oil and Gas Conservation Comm.
Attn.: Lori Tavlor
3001 Porcupine Dr.
Alaska 99501 C.~(~
\--
MWD Formation Evaluation Logs - R-32A & R-32A PB 1,
April 15, 1998
AK-N,~M-80120
The technical data listed below is being submitted herewith. Please acknowledge receipt bv returning a
signed copy of this transmittal letter to the attention oF
,ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G. 'Anchorage, AK 99518
2 LDWG formatted Discs with verification listings.
API#: 50-029-22413-01 & 50-029-22413-70
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252
A Division of Dresser Industries, Inc.
To:
WELL LOG TRANSMITTAL
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.' Loft Taylor
3001 Porcupine Drive ~
Anchorage, Alaska 99501 55~' C)C)
MWD Formation Evaluation Logs R-32A & R-32A PB 1,
April 15, 1998
AK-~MM-80120
R-32A:
2" x 5" ~MD Gamma Ray Logs:
50-029-22413-01
2" x 5" TVD Gamma Ray Logs:
50-029-22413-01
R-32A PBI:
2" x 5" .MD Gamma Ray Logs:
50-029-22413-70
2" x 5" TVD Gamma Ray Logs:
50-029-22413-70
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
1 Blueline
1 Rev Folded Sepia
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURN~G THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Service
Attn: Ali Turker
5631 Silverado Way, Suite G.
Adachorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center, MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date: /~//~ '~.~ ff
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (907) 563-3256 ° Fax (907) 563-7252
A Division of Dresser Industries, Inc.
Well Compliance Report
File on Left side of folder
198-009-0
MD 16900
T Name
D 8403
pRUDHOE BAy ~T ~.R]32A_ ' 50~ 029~224i3'01 BP E~LORATION
TYD 08965 etion Date: ~ Completed Status: 1WINJ Current:
/~,-.Interval Sent Received T/C/D
~-14 SPERRY MPT/GR
D 8404
L CMT MAP
L DGR-MD
L DGR-MD
L DGR-TVD
L DGR-TVD
L INJP-SP1N/TEM/
L PERF
WHPSTK SET RCD
R MWD SRVY
R MWD SRVY
~.~.14~'~ SPERRY MPT/GR PB1
~ 11330-11954
.tftlq~L 11693-12700 PB1
/~rq~AL 11693-16900
~AL 883E-8965
fI~JAL 8833-9000 PB1
[,.FINAL PRES 11200-11900 7/i/q~
FINAL 11600-11800 "~ ~r.-,: 7 6
~0-11723
/~P~RRY 11686.63-12700 PB1
~S-pERRy 11828.24-16900.
Daily Well Ops~/6/.? '
Was the well cored?
yes # no
Comments:
OH 4/15/98 4/18/98
OH 4/15/98 4/i 8/98
CH 5 4/16/98 4/21/98
OH 4/15/98 4/18/98
OH 4/15/98 4/18/98
OH 4/15/98 4/18/98
OH 4/15/98 4/18/98
CH 5 8/19/98 8/20/98
CH 5 8/20/98 8/27/98
CH 5 2/20/98 2/26/98
OH 4/30/98 5/4/98
OH 4/30/98 5/4/98
Are Dry Ditch Samples Required? yes 3!~,.~-And Received,.~yes~n~
Analysis Description Reee~-~ Sample~Set& ~
\.
Tuesday, April 04, 2000 Page 1 of 1
MEMORANDUM
TO:
State of Alaska
~aska Oil and Gas Conservation Commission
David Joh~ DATE: March 20, 1998
Chairman ~"
THRU:
Blair Wondzell, ~
P. I. Supervisor
FROM: Larry Waders,_ SUBJECT:
Petroleum Ihspeetor
FILE NO: .DOC
BOP Test
Doyon 16
PBU R-32ai
PTD 98-009
March 20,1998: I traveled to BPX R pad to witness a BOP test on Doyon 16.
They are doing a TTD (thru tubing drilling) and a 5000' departure. The BOP
stack was 7 1/16" with 2 7/8" pipe rams. Everything functioned as it should and
the testing went smooth.
SUMMARy: I witnessed a BOP test on Doyon 16. 0 failureS-~..
Attachments: aiigctfe.xis
cc;
NON-CONFIDENTIAL
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg: X Workover:
Drlg Contractor: Doyon Rig No.
Operator: BPX
Well Name: R-32ai
Casing Size: 7" Set (~ I2,135'
Test: Initial Weekly X Other
DATE: 20-Mar-98
16 PTD # 98-009 Rig Ph.# 659-4610
Rep.' Tom Maunder
Rig Rep.: Scoff Helm
Location: Sec. 32 T. 12N R. 13E Meridian Umiat
Test Pressures
MISC. INSPECTIONS:
Location Gen.: ok
Housekeeping: ok (Gen)
PTD On Location X
Standing Order Posted X
Well Sign X
Dri. Rig X
Hazard Sec. X
FLOOR SAFETY VALVES:
Upper Kelly / IBOP
Lower Kelly / IBOP
Ball Type
Inside BOP
Quan. Pressure
250-5000
250-5000
250-5000
250-5000
P/F
P
P
P
P
BOP STACK:
Annular Preventer 1
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves 2
Kill Line Valves 1
Check Valve
Quan. Test Press. P/F
P/F
250-3500
250-5000 P/F
250-5000 P/F
250-5000 P/F
250-5000 P/F
250-5000
250-5000
P/F
P/F
MUD SYSTEM: Visual Alarm
Trip Tank X X
Pit Level Indicators X X
Flow Indicator X X
Meth Gas Detector X X
H2S Gas Detector X X
CHOKE MANIFOLD:
No. Valves 13
No. Flanges
Manual Chokes 1
Hydraulic Chokes I
Test
Pressure P/F
250-5000 P
26 250-5000 P
Func~oned
Functioned
P
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained Affe~'~,,Iosure ~
System Pressure Attained
Blind Switch Covers: Master:
Nitgn. Btl's:
20o0
3,000 I '
2,200
minutes 18 sec.
minutes 10 sec.
X Remote: X
Psig.
Number of Failures: 0 ,Test Time: 3.5 Hours. Number of valves tested 15 Repair or Replacement of Failed
Equipment will be made within days. Notify the Inspector and follow with Wdtten or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS:
Distribution:
orig-Well File
c - Oper./Rig
c - Database
c - Trip Rpt File
c - Inspector
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
Larry Wade
F1-021L (Rev. 12J94) aiigctfe.xls
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 11842
Company: Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe-Bay (Cased Hole)
2/20/98
Well Job # Log Description Date BL RF Sepia LIS Tape
C- 12 PERFORATE RECORD 9 8 0 2 0 8 I 1
C-24 PERFORATE RECORD 9 8 0 2 0 8 I 1
D-14A LEAK DETECTION LOG 98021 3 1 1
N-11 A PERFORATE RECORD 98021 1 I 1
R-32A i WHIPSTOCK SET RECORD 9 8 0 2 0 9 I 1
....
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
TONY KNOWLE$, GOVEFINOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Februau'5. 1998
Dan Stoltz
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
P O Box 196612
Anchorage, AK 99519-6612
ae~
Prudhoe Bay Unit R-32Ai
BP Exploration (Alaska), Inc.
Permit No. 98-009
Sur. Loc. 699 NS , 1258'EWL, Sec. 32, T12N. R13E. UM
Btmnhole Loc. 687'NSL, 1904'EWL, Sec. 27, T12N, R13E. UM
Dear Mr. Stoltz:
Enclosed is the approved application for permit to rcdrill the above rcfcrcnccd wcll.
The permit to redrill does not exempt you from obtaining additional permits required bv law from
other governmental agcncies, and doe~ not authorize conducting drilling opcrations until all other
required permitting determinations arc made.
The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035:
and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC
25.412 and 20 25.030(g)(3). Sufficient notice (approximatcly 24 hours) of the MI test before
operation, and of the BOPE test performed before drilling below thc surface casing shoe. must be
given so that a representative of thc Commission may witness the tests. Noticc max' be given by
contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Chairman ~
BY ORDER OF THE COMMISSION
dlf/Enclosure
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o cncl.
STATE OF ALASKA
ALA-~,~ OIL AND GAS CONSERVATION~OMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Typeofwork I--IDrill []Redrill lib. Typeofwell I--IExploratory I--IStratigraphicTest D Development Oil
[] Re-Entry [] Deepenl []Service [] Development Gas []Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan RKB = 45.8' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation ,¢,~¢_ Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL ~
4. Location of well at surface 7. Unit or Property Name 111. Type Bond (See 20 AAC 25.025)
699' NSL, 1258' EWL, SEC. 32, T12N, R13E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number Number 2S100302630-277
4050' NSL, 3102' EWL, SEC. 33, T12N, R13E, UM R-32Ai
At total depth ,/,~ ,,~',,~'~ 9. Approximate spud date Amount $200,000.00
687' NSL, 1904' EWL, SEC. 27, T12N, R.,1,EE, UM 02/11/98
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028257, 3376'I R-23A, 141' at 13445' MD 2560 17565' MD /8950' TVD
16. To be completed for deviated wells 117. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 11698' MD Maximum Hole Angle 93° Maximum surface 3300 psig, At total depth (TVD) 8800' / 4390 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
4-1/2" 3-1/2" 9.8# L-80 ST-L 6135' 11430' 8542' 17565' 8950' 359 sx Class 'G'
i19. To be completed for Redrill, Re-entry, and Deepen Operations.RECEIVED
Present well condition summary
Total depth: measured 12135 feet Plugs (measured)JAN 1 5 1998
true vertical 9237 feet
Effective depth: measured 12059 feet Junk (measured) J~a8~. 0il & GaS Corls. C0mmissit
true vertical 9168 feet Anch0raoe
Casing Length Size Cemented MD'¥VD
Structural
Conductor 110' 20" 260 sx Arcticset (Approx.) 165' 165'
Surface 3286' 13-3/8" 1270 sx CS III, 375 sx Class 'G' 3340' 2966'
Intermediate 11620' 9-5/8" 1100 sx Class 'G' 11674' 8817'
Production
Liner 614' 7" 160 sx Class 'G' 11521' - 12135' 8677' - 9239'
Perforation depth: measured 111696'-11744', 11822'-11912' ORIGINAL
true vertical subsea 8836' - 8880', 8952' - 9034'
120. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: C..Md~ael Jackson, 564-5480 Chris Brown, 564-5582 Prepared By Name/Number: Terrie Hubble, 564-4628
21.' hereby certify that tl~'for~/going/l~'~u.e4jtn~rrect to the best of my knowledge
Signed DanStoltz /'/L/~'.~~ Title Senior Drilling Engineer Date
~ ~ Commission Use Only
Permit Number I APl Number Approval Date I See cover letter
/~?"'4:~ ¢I 50-029-22413-01 c:~ - ,~-"- ,~ 4~I for other requirements
Conditions of Approval: Samples Required DYes ~ No Mud Log Required []Yes 1~ No
Hydrogen Sulfide Measures ~Yes [] No Directional Survey Required J~Yes r-I No
Required Working Pressure for BOPE [] 2M; []3M; ,~.5M; [] 10M; [] 15M
Other:
r~:-~ii'tc¢~ f~cj~e~ B~ by order of
Approved By d~'"¢,_, ,rd .~p,~f~St0.q Commissioner the commission Datec/,
Form 10-401 Rev. 12-01-85
Submit In Triplicate
I Well Name:
IR-32ai
Sidetrack Plan Summary
IType of Redrill (producer or injector): I ~njector
Surface Location: 699' FSL, 1258' FWL, S32, T12N, R13E, UM
Target Location: 4050' FSL, 3102' FWL, S33, T12N, R13E, UM
Bottom Hole Location: 687' FSL, 1904' FWL, S27, T12N, R12E, UM
I AFE Number: 14P1032 I
I Estimated Start Date: ] 2/11/98 I
I Rig: I Doyon 16
Operating days to complete:
I MD: 117,565 I ITVD: 18950
I Well Design (conventional, slimhole, etc.):
138
Through tubing horizontal sidetrack
IObjective: I Sidetrack the R-32i well to the proposed Sag/Zone 4 target accessing new
I
injection zones
Mud Proeram
Whipstock Mud Properties: Solids Free 6 % Quikdriln
Density Funnel LSR LSRV API FL ph
(PPG) Viscosity YP
8.6-8.9 45-65 10-18 >35,000 NC 8.5-9.0
Production Mud Properties: Solids Free 6 % Quikdriln
Density Viscosity LSR LSRV API FL pH
(PPG) YP
8.6-8.9 45-65 10-18 >35,000 NC 8.5-9.0
Directional
I KOP: I 11698, MD (estimated)
Maximum Hole Angle:
Close Approach Well:
+93 o
R-23a, 141' @ 13445' (12600' object well)
T-01,437' @ 15688' (11006' object well)
PR331213, 774' @13957' (9000' object well)
R-32ai Sidetrack~Drilling Permit
Page 2/5
Formation Markers
Formation Tops MD TVD (SS)
11698' 8792' Window kick off point
TSag 11689' 8784'
TShublik 11744' 8828'
Tsad 11808' 8898'
TD 17565' 8950' End of target polygon - 3-1/2" liner point
HOT 9000' Not reached
Casing/Tubing Program
Hole Size Csg Wt/Ft Grade Conn Length Top Btm
MD/TVDss MD/TVDss
4.5" 3.5" 9.8 LB0 ST-L 6135' 11430'/8542' 17565'/8950'
8.681" 5-1/2" 17 LB0 NSCC 11506' 22'/-24' 11528'/8622'
NOTE: A~, this is a TTRD well, the 7"/5-1/2" tubing described above is already in place, and
will not be disturbed during the sidetrack.
Cement
Lead Cement Tail Cement
Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments
3.5" None 359/15.8 / 1.15 Class G: 40% excess; TOC at liner top;
Pump time = 4+ hrs;
Volume assumptions: Gauge hole + designated excess; 80' shoe joints; TOC as listed.
Logging Program
Logs:
4.5" Hole MWD GR. Platform express across reservoir interval (available in 4-1/2")
Cased Hole: CBL across liner
Well Control
Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular
preventer will be installed and will be capable of handling maximum potential surface pressures.
Diverter, BOPE and mud fluid system schematics on file with AOGCC.
R-32ai Sidetrack'~°rilling Permit
Page 3/5
Hazards
This is a TTRD well, and since the annular volume of the well is small, a close watch must be
kept on trip volumes, and tripping speeds to avoid surging and swabbing of the well.
The main production target for this well is the Sag River, although the Ivishak will be penetrated
briefly. For this reason, known hazards for the Ivishak are also listed below.
Sag River
The Sag River can sometimes have very low reservoir pressure in this area (as low as 6. lppg or
2700-2900psi). Despite this, the pad data sheet indicates that only one well (R-36i) has
experienced major lost circulation in this production interval, most other drilling wells
experiencing only minor losses. The area does have some faults which, if present, are likely to be
conductive, and this well does cross to 10-20' faults while in the target polygon, hence losses
should be expected. Productive zone LCM will be employed to combat this. On the R-36i well,
returns were also not obtained while cementing the casing in place. Losses should be cured
before attempting to run casing. Risk of differential sticking is expected based on offset wells,
but should be mitigated by the use of Quikdriln drilling fluid which is solids free.
Ivishak
Differential sticking has occurred frequently in the Ivishak at 9183' TVD. Once the sticking
occurs it is very strong and has created difficulty in freeing up the drillstring. On R-35A, the
sticking was successfully alleviated by pumping a 20bbl pill of Liquid Casing, OM Seal, and
Barafibre and reducing pump rate to 5bpm (to reduce ECD). Note however that these wells were
drilled using LSND mud; since the TTRD wells will employ solids free Quikdriln, this should
mitigate the risk of sticking. High torque has been reported on several wells in the production
hole, hence some open hole lubrication may be required. The pad data sheet incorporates wells
from R, F and J pad as the bottom hole location of these wells are all in the same area. Wells
from all three pads have experienced problems with bridges, tight hole, differential sticking, and
packing off while in the production interval. This has caused numerous incidents of stuck logs,
casing, and drillstring. This is a high potential stuck pipe area - be alert while driling this interval
and employ frequent reaming if any sign of unstable hole is seen.
Disposal
All cuttings should be hauled to the ball mill at CC-2A for disposal. Haul all drilling and
completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad
3 for disposal.
R-32ai Sidetrackorilling Permit
Page 4/5
Operational Summary
Pre-Rig Work:
NOTE: If any problems with the 9-5/8" packoff are observed during pre-rig work,
contact the wellhead manufacturer to initiate repairs. If repairs are not possible, the TTRD
sidetrack may be halted, and an alternative sidetrack method used.
This well is an injector, the Sag is frac'ed., and the remaining perforations will be
thermally fractured. This means that the perforations will likely drink most or all of a
standard cement plug. For this reason, it is recommended that a 20ppb aggregate cement
plug is pumped until some squeeze pressure is obtained.
If tubing and annulus have not recently (_<1 month) been tested R/U wireline and retrieve
SSSV. Set tubing plug in SWN nipple. Perform MIT on tubing and annulus to 4,000psi.
Retrieve tubing plug and POOH.
.
R/U slickline, and drift tubing to plug back TD at 12,059' (elm) to ensure access to lower
perforations. Drift tubing to SWN nipple at 11,781' with drift to ensure whipstock (3.635"
OD) pass through of minimum 3.8" OD.
RJU CT unit and RIH with cementing BHA. Jet liner across the proposed cement interval
in order to remove any debris (consider using "schmoo-be-gone"). Spot a balanced cement
plug w/20ppb aggregate (crushed brick) from base of the well to -11,500' (open
perforations from 11,696' to 11,912'), displacing with diesel against a closed choke until
1,000psi squeeze pressure is seen. Run back in hole to +11,743', circulating out excess
cement with contaminant to obtain the required TOC at _+11,743'. POOH. Let the plug set
up, then tag with slickline.
NOTE: If necessary to prevent loss of cement, circulate well to a diesel cushion sufficient
to reduce the hydrostatic overbalance on the cement column.
.
Pick up underreamer sized for 7" 26# casing, and underream interval from 11,600' to
11,743' to ensure good casing for whipstock to set in. Tag TOC as required for AOGCC
representative and POOH.
NOTE: The under-reamer will be working across a perforated interval and hence care
must be taken not to damage or lose any parts of the under-reamer arms
,
R/U electric line. Set Baker through tubing whipstock oriented highside with top of
whipstock at 11,695' set for a kickoff to exit the casing at 11,698' (the base of the
whipstock should be at approximately 11,713'). This will put the top of the whipstock 9'
MD below the base of the Kingak formation which is known to be troublesome. Please
have a Baker representative on site when setting the whipstock. RID electric line.
R-32ai Sidetrackorilling Permit
Page 5/5
If cement plugback or whipstock setting problems are encountered~ please contact
SSD Ops Drilling Engineer immediately for possible alternative procedures.
.
M/U 4.55" OD milling assembly and RIH. Mill out SWN nipple at 11,514' to 4.55". RIH,
tag whipstock/liner and mill out/dress window to 4.55". Do not mill out more formation
than is needed to bury the window dressing mill.
7. Circulate kill weight fluid and freeze protect with diesel (estimated BHP at 8800'TVDSS
is 3,500psi - 7.6ppg EMW) to depth of +2,200'.
Set and test BPV. Remove wellhouse and flowlines, level pad, dig out cellar.
Rig Work:
Prior to rig move, test 9-5/8" packoff to 5,000psi, and function lock down screws (FMC
wellhead representative to do this). If any problems with the 9-5/8" packoff are observed,
contact the wellhead manufacturer to initiate repairs. If repairs are not possible, the TTRD
sidetrack may be halted, and an alternative sidetrack method used.
2. MIRU. Pull BPV and set/test TWCV. ND tree, NU BOP's and test same. Pull TWCV.
.
RIH with 4.5" drilling assembly (circulate out freeze protection) and tag TD of new hole.
Displace well to Quikdriln drilling fluid, and drill 4.5" hole section to TD of 17,565' as per
directional plan.
4. RIH with DPC logs and make logging run across open hole section from window to TD.
.
M/U and run 6,135' of 3-1/2" solid L80 ST-L liner to hang off depth in 7" tubing of
_+11,430'. Cement liner in place with inner string cementing assembly, and set liner
hanger/packer. Circulate out excess cement, and displace well to clean seawater. POOH.
6. RIH with DPC perforating guns and perforate 50' of liner.
7. RIH with DP and circulate freeze protection to +2,200'MD.
8. Set and test TWCV, ND BOP, NU tree. Pull TWCV and set/test BPV. RDMO
TREE~-~,~2''- 5M CIW .... '
R 32i KB. E~Ev = 32.5'
WELLHEAD: 13 5/8" - 5M FMC ' GRND. ELEV = 20.3'
ACTUATOR: BAKER
51/2" SWSNIPPLE
(PARKER)( 4.562" ID)
I KOP @ 600'
Max Angle @ 47°
5-1/2", 17#, L-80,
NSCC Tbg
I
I
5-1/2 .... SWS" NIPPLE
I ~ (PARKER) (4.562" ID). 11408
9-5~8 x 5-1/2" PACKER ] 11464
X X -- TIW HBBP HYDRO-SET
I
/ I "" ~'-- 5-1/2" "SWS"NIPPLE
I
5-1/2", 17 #/ft, L-80,
(PARKER)
(4.562"
ID)
TAILPIPE
Top of TIW 11521 I I I / 5'1/2 .... SWN" NIPPLE'
I~ (Parker) (4.455" ID) 11514
7" Liner Hanger I
TIW 9-5/8" liner top ~ ~ ~
pgacker 5-1/2" WLEG I 11528
'5/8", 47# L'80 111674 I J
NSCC
,
REF: LOG: I BAKER KB-1 (3.958"
SIZE SPF INTERVAL ! I -.---.-_ 14D.)I/2,,SWSNipple..
11776I
~)~1~ /~:;)Z' )11,696-11,744 OPEN I PARKER
PARKER I11781 I
~,,, ~..,., ~-~o. I ~ ,il
NSCC
DATE REV. BY COMMENTS
PRUDHOE BAY UNIT
12/08/93 SJA POST COMPLETION WELL: R-32 (22-33-12-13)
APl NO: 50-029- 22413.
BP/ARCO PBU DRILLING
5 ~." - 5M ClW
135/8,,-5M FMc R-32i Proposed Completion
BAKER
KB. ELEV-- 32.5'
GRND. ELEV = 20.3'
13'3/8",68#,J 3340 J
L-80, BTC
5 1/2" SWS NIPPLE 2134
(PARKER)( 4.562" ID)
COUPLINGS ON SWS NIPPLE.
IKOP @ 600'
Max Angle @ 47°
I5-1/2", 17#, L-80, I
NSCC Tbg
5-1/2" x 3-1/2" Liner
hanger/packer
5-1/2", 17 #/ft, L-80,
TAILPIPE
Top of TIW
7" Liner Hanger I 11521J
TIW 9-5/8" liner top
pgacker
-5/8", 47# L-80 ~ 11674
NSCC
L
Whipstock top set
11,695' (kick off at 11,698')
Cement plug top --
at 11,743'
Squeezed
pedorations
11,696'-11,744'
11,822'-11,912'.
5-1/2 .... SWS" NIPPLE I
(PARKER) (4.562" ID) 11408
9-5/8 x 5-1/2" PACKER I 11464
I
TIW HBBP HYDRO-SET
5-1/2 .... SWS" NIPPLE I
(PARKER) (4.562" ID) . 11495
5-1/2 .... SWN" NIPPLE
(Parker) (Milled out to I 11514
4.55" ID)
I
5-1/2" WLEG I
11528
3-1/2", 9.6#, LS0,
ST-L liner
4-1/2" TD
at 17,565'
7" x 4 1/2" Packer
· --'- BAKER FB-1 (3,958" I 11769
ID)
I
4-1/2" SWS
~ Nipple I 11776
PARKER
4-1/2" SWN
-'--' Nipple I 11781
PARKER
~ 4-1/2"
Wleg 11785
26 #/ft, L-80,
NSCC
PBTD
12059
12135
DATE
12/08/93
REV. BY
SJA
12/13/97 CJB
COMMENTS
POST COMPLETION
PROPOSED COMPLETION
PRUDHOE BAY UNIT
APl NO.' 50-0.~_29-2241._______~3
BP/ARCO PBU DRILLING
4500
Shared Services Drilling
I inrh .-. 1 (l(10ft
6500 7500
I I
8500
FRRtinn.~
950O
1O5OO
I DrillQuest'
11500
R-32.AI T1
8&39.80 'IWD
9020.80 TYD
3354,53 I'i, 7112.79 E
R-,32~ ~
8995.80 TVO
5073.33 I~ 8..~3.96 E
R-32Ai Wp4
R-32AJ T2
8ggS.80 TVO
.5276.50 N. 11188.1)4 E
8955.8O TVD
4439.24 N. 797245 E
Proposal Data for R-32Ai Wp4
Vertical Ot:lg~ In: . Well
H(xlzontal'Odgln: Well - ' ""' - '-" ' ~'"'" '
Measurement U~s:
, North Reference: Trna No, th
Dogleg Severity: Degre~ per 10Ott
Vmltcal Section Azimuth:
81,186'
Vertical Section Descripllo~OP
Vertical Section Origin: 2728.09 N.6555.23 E
Measured Im:L Azlm. Vmlical Northlng$ Eastings Ve~cai Dogleg
Depth Depth Section Rate
I 1698.00 23.968 69J59 ~83.7.82 2728.09 N 6555.23 E '7058.47
11728.0026.605 66.50~ 8864.94 Z'/32.8'/N 6567.12 E 7071.19 10.000
12188.5896.861 37.r/2 9072.81 2~93.06 N 6838.31 E 7434.21 16.000
12(302.33 96.861 3.7.1.729025.38 3320..39 N .70a6.51 E'7809.440.000
12645.5290.000 :38.000 ~720.80 3354,53 N '7112..79 E 7848.92 16.000
12673.2692.744 38.406 9020.14 3376.32 N '7129.94 E7874.45 I0.000
14003.3892.744 38.406 8956.46 4417.45 N '~55.30 E 9099.42 0.000
14031.1290.000 3~.000 8955.~0 4439.24 N '~YZZ,45 E9124.94 !0.000
14228.8985.~53 1&645 8963.02 4612.33 N 8065.'/9 E92<90.15I0.000
14307.0385.853 ! 8.64~iS96~67 4686.18 N 8090.71 E 934'7.580.000
149'71.24 90.000 ~.000 8995.80 5073.33 N 858,3.96 E9966.36 I0.000
17583.2'7 90.000 86.0'/8 89~5.80 $2'76.50 N lllSS.04 E12345.940.041
I I I I I I
6500 7500 8500 9500 10500 11500
'l Scale: lin(J~5= 1000tt Eastings Reference is True North
-- 5500
- 3500
- 2500
~'-'1 I I I I I I
6500 7500 8500 9500 10500 11500 12500
Scale: linch = 1000ft Vertical Section Section Azimuth: 61.186° (True North)
Shared Services Drillin§
Prudhoe Bay Unit
Measured
Depth Incl.
(fl)
11698.00 23,968
11698.57 24,017
11700.00 24.141
11728.00 26.605
11737.97 27.991
11800.00 36.965
11822.67 40.344
11900.00 52.080
12000.00 67.511
12100.00 83.061
12188.58 96.861
12200.00 96.861
12300.00 96.861
12400.00 96.861
12500.00 96.861
12600.00 96.861
12602,33 96.861
12645.52 90.000
12673.26 92.744
12700.00 92.744
12800.00 92.744
12900.00 92.744
13000.00 92.744
13100.00 92.744
' 13200.00 92.744
13300.00 92.744
13400.00 92.744
13500.00 92.744
13600.00 92.744
13700.00 92.744
Sub-Sea
Azim. Depth
,
69.859 8792.03
69.789 8792.54
69.615 8793.84
66.509 8819.14
64.787 8828.00
56.819 ':8880.30
54,705 8898.00
49.240 8951.44
44.316 9001.62
40.404 9026.95
37.172 9027.01
37.172 9025.65
37.172 9013.70
37.172 9001,75
37.172 8989.81
37.172 8977.86
37.172 8977.58
38.000 8975.00
38.40,6 8974.34
38.4~& 8973.06
38.406 8968.27
38.405 8963.48
38.406 8958.70
38,406 8953.91
38.406 8949.12
38.406 8944.33
38.406 8939.55
38.406 8934.76
38.406 8929.97
38.406 8925.19
Vertical
Depth
8837.83
8838.34
8839.64
8864.94
8873.80
8926.10
8943.80
8997.24
9047.42
9072.75
9072.81
9071.45
9059.50
9047.55
9035.61
9023.66
9023.38
9020.80
9020.14
9018.86
9014.07
9009.28
9004.50
8999.71
8994.92
8990.13
8985.35
8980.56
8975.77
8970.99
Sperry-Sun Drilling Services
Proposal Report for R-32Ai- R-32Ai Wp4
Local Coordinates
Northings Eastings
2728.04N 6555.23 E
2728,17 N 6555.45 E
2728.37 N 6556.00E
2732,87 N 6567.12 E
2734.76 N 6571.28 E
2751.20 N 6600.13 E
2759.18 N 6611.83E
2793,69 N 6655.53 E
2852.88 N 6718.09 E
2924,19 N 6782.96 E
2993.06 N 6838.31E
3002,10 N 6845.16 E
3081.21N 6905.15 E
3160.32 N 6965.13 E
3239.43N 7025.12 E
3318.55 N 7085.11E
3320.39 N 7086.51E
3354.53 N 7112~9 E
3376.32 N 7129.94 E
3397.25 N 7146.53E
3475.53 N 7208.58 E
3553.80 N 7270.63 E
3632.07 N 7332.69 E
3710.34 N 7394.74 E
3788.62 N 7456.79 E
3866.89 N 7518.84E
3945.16 N 7580,89 E
4023.44 N 7642.95 E
4101.71N 7705,00E
4179.98 N 7767.05 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (fi) (?/'~OOft) - (f)-
5980018.57 N 641413,81E 7058.45
5980018.71N 641414.02E 10.000 705820
5980018,92 N 641414,57E 10.000 7059.28
5980023.62 N 641425.60 E 10.000 7071.19
5980025.58 N 641429.73 E 16,000 7075,75
5980042.54N 641458.29 E 16.000 7108,95
5980050.72 N 641469,84 E 16,000 7123.05
5980086.02 N 641512.91E 16,000 7177.97
5980146.32 N 641574,39 E 16,000 7261.31
598021829 N 641637.97E 16.000 7352.52
5980288,65 N 641692,07E 16.000 7434.21
5980297.81N 64169826 E 0,000 7444.57
5980377.98 N 641757,31E 0,000 7535.26
5980458.16 N 641815,86 E 0,000 7625.95
5980538.34 N 641874,42 E 0.000 7716.64
5980618.52 N 641932.97 E 0,000 7807.33
5980620.39 N 641934,34E 0,000 7809.44
5980655.00 N 641960.00 E 16,000 7848.92
5980677.09 N 641976,75 E 10,000 7874.45
5980698.32 N 641992.97 E 0,000 7899.08
598077720 N 642053.60 E 0.000 7991.17
5980857.07 N 642114,23 E 0,000 8083.27
5980936~5 N 642174.87E 0.000 8175.36
5981015.83 N 642235,50 E 0,000 8267.45
5981095,21N 642296.13 E 0.000 8359.55
5981174.58 N 642356.77 E 0,000 8451.64
5981253.96 N 642417.40 E 0.000 8543.74
5981333.34 N 642478.03 E 0.000 8635.83
5981412.71N 642538.66 E 0.000 8727.93
5981492.09 N 642599,30 E 0.000 8820,02
Comment
-- -- -- - .~.'.
Shublik
TSad
Target: R-32Ai Iht1, Geological
Alaska State Plane Zone 4
PBU_WOA R Pad
PRELIMINARY
Continued...
17 December, 1997 - 9:53
-1-
OrillQuest
Shared Services Drilling
Prudhoe Bay Unit
Measured
Depth
(fl)
Sub-Sea Vertical
Incl. Azim. Depth Depth
(fl) (ft)
92.744 38.406 8920.40 8966.20
92.744 38.406 8915.61 8961.41
92.744 38.406 8910.83 . 8956.63
92.744 38.406 8910.66 8956.46
90.000 38.000 8910.00 8955.80
·
88.531 31.270 , '8910.88 8956.68
86.440 21.481 8915.28 8961.08
85.853 18.645 8917.22 8963.02
85.853 18.645 8922.37 8968.17
85.853 18.645 8922.87 8968.67
· 86.200 27.958 8929.33 8975.13
86.685 37.965 8935.55 8981.35
87.270 47.962' 8940.84 8986.64
87.938 57.949 8945.03 8990.83
88.669 67.927 8948.00 8993.80
·
89.439 77.898 8949.65 8995.45
90.000 85.000 8950.00 8995.80
90.000 85.012 8950.00 8995.80
90.000 85.053 8950.00 8995.80
90.000 85.094 8950.00 8995.80
90.000 85.136 8950.00 8995.80
90.000 85.177 8950.00 8995.80
90.000 85.218 8950.00 8995.80
90.000 85.259 8950.00 8995.80
90.000 85.301 8950.00 8995.80
90.000 85.342 8950.00 8995.80
90.000 85.383 8950.00 8995.80
90.000 85.425 8950.00 8995.80
90.000 85.466 8950.00 8995.80
90.000 85.507 8950.00 8995.80
1:~800.00
13900.00
14000.00
14003.38
14031.12
14100.00
14200.00
14228.89
14300.00
14307.03
14400.00
14500.00
14600.00
14700.00
14800.00
14900.00
14971.24
15000.00
15100.00
15200.00
15300.00
15400.00
15500.00
15600.00
15700.00
15800.00
15900.00
16000.00
16100.00
16200.00
Sperry-Sun Drilling Services
Proposal Report for R-32Ai- R-32Ai Wp4
Local Coordinates
Northings Eastings
(ft) (ft)
.'
4258.26 N 7829.10 E
4336.53 N 7891.15 E
4414.80 N 7953.21 E
4417.45 N 7955.30 E
~ 4439.24 N 7972.45 E
4495.87 N
4585.26 N
4612.33 N
4679.53 N
4686.18 N
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (fl) (°/100ft) - (fl).
4771.26 N
4854.90 N
4927.88 N
4987.99 N
5033.41 N
5062.75 N
5O73.33 N
5075.84 N
5084.50 N
5093.08 N
5101.60 N
51'10.04 N
5118.41 N
5126.71 N
5134.94 N
5143.10 N
5151.18 N
5159.20 N
5167.14 N
5175.01 I~"
5981571.47 N 642659.93 E 0.000
5981650.85 N 642720.56 E 0.000
5981730.22 N 642781.20 E 0.000
5981732.91 N 642783.25 E 0.000
5981755.00 N 642800.00 E 10.000
8011.57 E 5981812.33 N 642838.10 E 10.000
8055.90 E 5981902.50 N 642880.81 E 10.000
8065.79 E 5981929.75 N 642890.21 E 10.000
8088.47 E 5981997.35 N 642911.67 E 0.000
8090.71 E 5982004.03 N 642913.80 E 0.000
· 8127.36 E 5982089.76 N 642948.90 E 10.000
8181.59 E 5982174.36 N 643001.63 E 10.000
8249.57 E 5982248.55 N 643068.27 E 10.000
8329.21 E 5982310.09 N 643146.83 E 10.000
8418.11 E 5982357.10 N 643234.89 E 10.000
8513.56 E 5982388.15 N 64,3329.80 E 10.000
8583.96 E 5982400.00 N 643400.00 E 10.000
8612.62 E 5982403.02 N 643428.60 E 0.041
8712.24 E 5982413.47 N 643528.06 E 0.041
8811.87 E 5982423.85 N 643627.52 E 0.041
8911.51 E 5982434.16 N 643726.98 E 0.041
9011.15 E 5982444.39 N 643826.46 E 0.041
9110,80 E 5982454.56 N 643925.94 E 0.041
9210.46 E 5982464.65 N 644025.43 E 0.041
9310.12 E 5982474.67 N 644124.93 E 0.041
9409.78 E 5982484.62 N 644224.43 E 0.041
9509.46 E 5982494.50 N 644323.94 E 0.041
9609.13 E 5982504.30 N 644423.46 E 0.041
9708.82 E 5982514.04 N 644522.98 E 0.041
9808.51 E 5982523.70 N 644622.52 E 0.041
Comment
~ _- _ - ~....
8912.11
9004.21
9096.30
9099.42
9124.94 · Target: R-32Ai Iht2, Geological
9186.52
9268.44
9290.15
9342.41
9347.58
9420.70
9508.52
9603.26
9702.01
9801.80
9899.57
9966.36 Target: R-32Ai Iht3, Geological
9992.67
10084.13
10175.57
10266.97
10358.35
10449.69
10'541.01
10632.30
10723.56
10814.78
10905.98
10997.15
11088.29
Alaska State Plane Zone 4
PBU_WOA R Pad
-
Continued...
17 December, 1997 - 9:53 - 2 - DrillQuest
Sperry-Sun Drilling 'Services
Proposal Report for R-32Ai- R-32Ai Wp4
Shared Services Drilling
Prudhoe Bay Unit
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(~t) (ft) (~t)
16300.00 90.000 85.548 8950.00 8995.80
16400.00 90.000 85.590 8950.00 8995.80
16500.00 90.000 85.631 8950.00 8995.80
16600.00 90.000 85.672 8950.00 8995.80
16700.00 ' 90.000 85.713 .8950.00 8995.80
16800.00 90.000 85.755 , ~' =8950.00 8995.80
16900.00 90.000 85.796 8950.00 8995.80
17000.00 90.000 85.837 8950.00 8995.80
17100.00 90.000 85.879 8950.00 8995.80 .
17200.00 90.000 85.920 8950.00 8995.80
17300.00 90.000 85.961 8950.00 8995.80
17400.00 90.000 86.002 8950.00 8995.80
17500.00 90.000 86.044 8950.00 ' 8995.80
17583.27 90.000 86.078 8950.00 8995.80
Local Coordinates
Northlngs Eastings
(ft) (ft) '
,. ~
o'
5182.81 N 9908.20 E
5190.53 N 10007.90 E
5198.19 N 10107.61 E
5205.77 N 10207.32 E
5213.28 N 10307.04 E
5220.72 N 10406.76 E
5228.08 N 10506.49 E
5235.38 N 10606.23 E
5242.60 N 10705.96 E
5249.75 N 10805.71 E
5256.83 N 10905.46 E
5263.84 N 11005.21 E
5270.77 N 11104.97 E
5276.50 N 11188.04 E
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(fi) (ft) (°/lOOft) .- (ft)-
5982533.29 N 644722.06 E 0.041 11179.40
5.982542.81 N 644821.60 E 0.041 11270.48
5982552.26 N 644921.15 E 0.041 11361.54
5982561.63 N 645020.71 E 0.041 11452.56
5982570.94 N 645120.28 E 0.041 11543.55
5982580.17 N 645219.85 E 0.041 11634.51
5982589.33 N 645319.43 E 0.041 11725.44
5982598.42 N 645419.02 E 0.041 11816.34
5982607.43 N 645518.61 E 0.041 11907.21
5982616.38 N 645618.21 E 0.041 11998.05
5982625.25 N 645717.82 E 0.041 12088.87
5982634.06 N 645817.43 E 0.041 12179.65
5982642.79 N 645917.05 E 0.041 12270.40
5982650.00 N 646000.00 E 0.041 12345.94
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Comment
...-- _ -~:,,. ~_-- ~
Target: R-32Ai T2, Geological
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well and calculated along an Azimuth of 61.186° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 17583.27ft.,
The Bottom Hole Displacement is 12369.87ft., in the' Direction of 64.751° (True).
Alaska State Plane Zone 4
PBU_WOA R Pad
17 December, 1997- 9:53
-3-
DrillQuest
STATE OF ALASKA
ALA,Er'A 0IL AND GAS CONSERVATION cOM~v~:$GION
APPLICATION FOR :SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging []Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
699' NSL, 1258' EWL, SEC. 32, T12N, R13E, UM
At top of productive interval
3443' SNL, 2579' EWL, SEC. 33, T12N, R13E, UM
At effective depth
N/A - Water Injector
At total depth
3488' NSL, 2698' WEL, SEC. 33, T12N, R13E, UM
5. Type of well:
[-~ Development
i-'1 Exploratory
[] Stratigraphic
[~Service
6. Datum Elevation (DF or KB)
KBE - 53.5'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
R-32i
9. Permit Number
93-164
'10. APl Number
50-029-22413
:11. Field and~Po~l
Pool ~
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
~,~ Structural
Conductor
Surface
Intermediate
Production
Liner
12135 feet
9237 feet
12059 feet
9168 feet
Length
110'
3286'
11620'
614'
Plugs (measured)
Junk (measured)
Size Cemented
20" 260 sx Arcticset (Approx.)
13-3/8" 1270 sx CS III, 375 sx Class 'G'
9-5/8" 1100 sx Class 'G'
7" 160 sx Class 'G'
MD TVD
165' 165'
3340' 2966'
11674' 8817'
11521'-12135' 8677'-9239'
Perforation depth: measured 111696'-11744', 11822'-11912'
true vertical subsea 8836'-8880', 8952'-9034'
Tubing (size, grade, and measured depth) 5~1/2", L-80 at 11529'
Packers and SSSV (type and measured depth) packer at 11464'; SSSV at 2134'
13. Attachments [~ Description summary of proposal E~] Detailed operations program [~] BOP sketch
14. Estimated date for commencing operation
January 14, 1'997
16. If proposal was verbally approved
Name of approver Date approved
Contact Engineer Name/Number: Chris Brown, 564-5582
15. Status of well classifications as:
[--] Oil [] Gas [] Suspended
Service Water Injection
Prepared By Name/Number: Terrie Hubb/e, 564-4628
17. I hereby certif~ that the for)~oing is true and correct to the best of my knowledge
Dan S ~'~ f/C!v. 5'/-0 Z-T"~ Title Senior Drilling Engineer
u Commission Use Only
Conditions of Approval: Notify Commission so representative may witness
J Approval No..~¢~-'~ 0 7
PI Lu ' ' ~. )cation clearance
M~~nt~orm required 10- /~, (2"7_ _~ _ __
Approved by order of the Commission ~ .~~~.~'~-;-~.~ Commissioner
Form 10-403 Rev. 06/15/88
Subr~it In t~riplicate
H131945
I ~.~.~1 I~"~'°-oo~~.~
VENDOR ~,~L_ASKA,'~T ~ 4 OG
NET
i 00. O0
DATE
121797
PYMT
HANDL
INVOICE / CREDIT MEMO
CK121797A
COMMENTS'
iNQ INST'
THE ATTACHED CHECK IS IN PAYMENT FOR [TEMS DESCRIBED ABOVE.
DESCRIPTION
ompang peemit
iication
kathg campom
GROSS
100.00
to drill
mot, x5!~
DISCOUNT
· WELL PERMIT CHECKLIST COMPANY
FIELD & POOL ~' ~'/f27 ,~' ,~ INIT CLASS
WELL NAME/~g~'~-~. ~"3~ ~ PROGRAM: exp [] dev [] redrrl~serv~wellbore seg E, ann. disposal para req []
GEOL AREA ;~? ~ UNIT# //~"~,.~ ON/OFF SHORE
ADMINISTRATION
AP. PR .DATE
1. Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
~N
N
N
N
N
N
N
N
N
N
N
N
N
ENGINEERING
14. Conductor string provided ...................
15. Surface casing protects all known USDWs ........... Y N t'
16. CMT vol adequate to circulate on conductor & surf csg ..... Y
17. CMT vol adequate to tie-in long string to surf csg ........ Y
18. CMT will cover all known productive horizons .......... ~ N
19. Casing designs adequate for C, T, B & permafrost ....... (~ N
20. Adequate tankage or reserve pit .................
N
21. Ifa re-drill, has a 10-403 for abandonment been approved...
22. Adequate wellbore separation proposed ............. ('~ .N
23. if diverter required, does it meet regulations .......... --~
24. Drilling fluid program schematic & equip list adequate ..... ~ ,N,
25. BOPEs, do they meet regulation ...... ~.: ........ ~ N
26. BOPE press rating appropriate; test to ..~ ~ . psig. (_~ N
27. Choke manifold complies w/APl RP-53 (May 84) ........
28. Work will occur without operation shutdown ........... ~ N
29. Is presence of H2S gas probable ................. ~ N
GEOLOGY
30. Permit can be issued w/o hydrogen sulfide measures ..... YY N/~ ~,~//-/~
31. Data presented on potential overpressure zones ....... /~N .// . . ;
32. Seismic analysis of shallow gas zones .............
33. Seabed condition survey (if off-shore) ........... .,/d/ Y N
34. Contact name/phone for we,ekly,pro~ress rep?ts . . . .,/.. Y N lexp~ora~ory on~yj /
REMARKS
GEOLDGY:
ENGINEERING: COMMISSION'
JDH ~ RNC~
co
Comments/Instructions:
HOW/lit - A:\FORMS\cheklist rev 09/97
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
Thu Apr 09 16:17:27 1998
Reel Header
Service name ............. LISTPE
Date ..................... 98/04/09
Origin ................... STS
Reel Name....~. ........... UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical
Services
Tape Header
Service name ............. LISTPE
Date ..................... 98/04/09
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical
Services
Physical EOF
Comment Record
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
R-32A
500292241301
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
09-APR-98
MWD RUN 1 MWD RUN 7 MWD RUN 8
AK-MM-80120 AK-MM-80120 AK-M~-80120
E. CRIBBS E. CRIBBS E. CRIBBS
D. BURLEY J. HUFF J. HUFF
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 9 MWD RUN 10 MWD RUN 11
AK-MM-80120 AK-MM-80120 AK-MM-80120
K. ALLEN K. ALLEN K. ALLEN
J. HUFF J. HUFF J. HUFF
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 12
AK-MM-80120
K. ALLEN
J. HUFF
MWD RUN 13
AK-M~-80120
K. ALLEN
M. JACKSON
MWD RUN 14
AK-MM-80120
K. ALLEN
M. JACKSON
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
MWD RUN 15
AK-MM-80120
K. ALLEN
M. JACKSON
MWD RUN 16
AK-MM-80120
K. ALLEN
M. JACKSON
32
12N
13E
699
1258
48.10
46.70
20.30
RAY).
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING 13.375 3340.0
2ND STRING 9.625 11674.0
3RD STRING 7.000 11693.0
PRODUCTION STRING 4.750 16900.0
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUNS 1 AND 6-16 ARE DIRECTIONAL WITH GAMMA RAY
(DGR) UTILIZING GEIGER-
MUELLER TUBE DETECTORS (SOLAR 175 TOOL).
3. MWD RUN 6 MADE NO NEW FOOTAGE IN THE SIDETRACKED
HOLE AND IS NOT PRESENTED.
4. MWD RUN 12 UTILIZES REAL TIME DATA IN THE INTERVALS
14531'MD, 8992'TVD TO
14567'MD, 8993'TVD AND 14969'MD, 9006'TVD TO 14987'MD,
9009'TVD. MWD RUN 16
ALSO USES REAL TIME DATA IN THE INTERVAL 16782'MD,
8981'TVD TO 16804'MD,
8979'TVD. IN THESE INTERVALS, DOWNHOLE GAMMA COUNTS
EXCEEDED THE MAXIMUM
RECORDABLE VALUE.
5. MWD RUNS 1 & 7-16 REPRESENT WELL R-32A WITH API#:
50-029-22413-01.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 16900'MD,
8965'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED (SOLAR 175 GAMMA
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs mezged.
DEPTH INCREMENT: .5000
FILE SUI~ARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 11630.0 16852.0
ROP 11692.0 16904.0
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
11630.0
11682
11687
11689
11694
11698
11727
11731
11734
11737
11741
11750
11752
11754
11757
11760
11762
11764
11770
11774
11779
11782
11785
11788
11801
11814
11815
11821
11824
11829
11834
11837
11838
11839
11842
11845
11855
11856
11858
11859
11862
11863
11866
.0
.0
.5
.5
0
0
5
0
5
5
.0
0
0
5
0
0
0
0
5
0
5
0
5
0
0
5
0
5
5
0
0
0
5
5
0
0
5
5
5
0
5
0
GR
11630.5
11682.5
11687.5
11690.5
11695.5
11699.0
11727.5
11731.0
11734.0
11737.5
11741.5
11750.5
11753.5
11756.0
11759.0
11762.0
11763.5
11766.0
11770.0
11775.0
11779.5
11783.0
11786.5
11789.5
11800.5
11814 0
11815 0
11822 0
11826 5
11829 5
11834 5
11836 5
11837 5
11838 5
11841 0
11844 5
11852 5
11853 0
11855 0
11858 5
11862 0
11863 5
11866 0
EQUIVALENT UNSHIFTED DEPTH --
11876 0
11880 5
11881 5
11886 0
11889 0
11903 5
11926.5
11930.0
11932.5
16904.0
$
MERGED
PBU
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
$
REMARKS:
11874.5
11880.0
11881.0
11885.0
11889..5
11901.0
11923.0
11926.5
11928.5
16900.0
DATA SOURCE
TOOL CODE
BIT RUN NO MERGE TOP
1 11693.0
7 11863.0
8 12036.0
9 13939.0
10 14008.0
11 14147.0
12 14498.0
13 15621.0
14 15684.0
15 15911.0
16 16242.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
MERGE BASE
12110.0
12036.0
13939.0
14008.0
14147.0
14498.0
15621.0
15684.0
15911.0
16242.0
16900.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 11630 16904 14267 10549 11630
ROP 2.2837 3937.5 88.4259 10425 11692
GR 8.9208 207.846 51.4111 10445 11630
Last
Reading
16904
16904
16852
First Reading For Entire File .......... 11630
Last Reading For Entire File ........... 16904
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Conunent Record
FILE HF~ADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 11630.5 11860.0
ROP 11693.0 11860.0
$
LOG HEADER DATA
DATE LOGGED: 14-FEB-98
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 27.0
M~XIMUM ANGLE: 75.3
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS
ISC 5.07 / ISC 5.07
DM .13 / GM 1.21/1.22
MEMORY
12110.0
11693.0
12110.0
TOOL NUMBER
SOLAR GM 78653
4.500
4.5
MUD TYPE:
MUD DENSITY (LB/G) :
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
QUIKDRIL-N
8.60
46.0
8.6
28000
7.0
.000
.000
.000
.000
.3
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 1 FT/H 4 1 68 4 2
GR MWD 1 API 4 1 68 8 3
40.0
First
Name Min Max Mean Nsam Reading
DEPT 11630.5 11860 11745.2 460 11630.5
ROP 8.062 632.498 73.4093 335 11693
GR 29.9576 207.846 109.124 460 11630.5
Last
Reading
11860
11860
11860
First Reading For Entire File .......... 11630.5
Last Reading For Entire File ........... 11860
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535'
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 7
DEPTH INCREMENT: ,5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11860.5
ROP 11860.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11983.5
12036.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHM}4) AT TEMPERATURE (DEGF)
22-FEB-98
ISC 5.07 / ISC 5.07
DM .13 / GM 1.21/1.22
MEMORY
12036.0
11863.0
12036.0
51.7
86.0
TOOL NUMBER
SOLAR GM 78653
4.500
4.5
QUIKDRIL-N
8.60
49.0
9.7
29000
4.0
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.000
.000
.000
.000
.4
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 7 API 4 1 68 4 2
ROP MWD 7 FT/H 4 1 68 8 3
61.7
First
Name Min Max Mean Nsam Reading
DEPT 11860.5 12036 11948.2 352 11860.5
GR 24.186 93.8311 39.1852 247 11860.5
ROP 2.2837 595.925 41.9289 352 11860.5
Last
Reading
12036
11983.5
12036
First Reading For Entire File .......... 11860.5
Last Reading For Entire File ........... 12036
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record.-.65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Con~ment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 8
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 11984.0 13886.0
ROP 12037.5 13938.5
$
LOG HEADER DATA
DATE LOGGED: 25-FEB-98
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 85.5
MAXIMUM ANGLE: 98.6
ISC 5.07 / ISC 5.07
DM .13 / GM 1.21/1.22
MEMORY
13939.0
12036.0
13939.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
SOLAR GM 78653
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
4.500
4.5
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
QUIKDRIL-N
8.70
49.0
8.0
31000
4.2
.000
· 000
.000
.000
72.8
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STTkNDOFF (IN):
EWR FREQUENCY (HZ):
REMJ~RKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.4
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 8 API 4 1 68 4 2
ROP MWD 8 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 11984 13938.5 12961.2 3910 11984
GR 18.718 188.134 39.584 3805 11984
ROP 10.0183 2334.32 87.1065 3803 12037.5
Last
Reading
13938.5
13886
13938.5
First Reading For Entire File .......... 11984
Last Reading For Entire File ........... 13938.5
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 9
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 13887.0
ROP 13940.0
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
13995.0
14007.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G) :
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STA/~DOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
27-FEB-98
ISC 5.07 / ISC 5.07
DM .13 / GM 1.21/1.22
MEMORY
14008.0
13939.0
14008.0
91.6
92.3
TOOL NUMBER
SOLAR GM 77113
4.500
4.5
QUI KDRI L-N
8.70
49.0
8.8
31000
4.1
.000
.000
.000
.000
72.9
.2
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
GR MWD 9 API 4 1 68
ROP MWD 9 FT/H 4 1 68
Code
Offset
0
4
8
Channel
1
2
3
Name Min Max Mean Nsam
DEPT 13887 14007.5 13947.2 242
GR 22.2325 108.453 44.5657 137
ROP 8.8662 250.971 54.925 136
First
Reading
13887
13887
13940
Last
Reading
14007.5
13955
14007.5
First Reading For Entire File .......... 13887
Last Reading For Entire File ........... 14007.5
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
6
header
10
data for each
bit
run
in separate files.
DEPTH INCREMENT: .5000
FI LE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 13956.5
ROP 14009.5
$
LOG HEADER DATA
DATE LOGGED:
S O FTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
14095.5
14148.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
28-FEB-98
ISC 5.07 / ISC 5.07
DM .13 / GM 1.21/1.22
MEMORY
14147.0
14008.0
14147.0
87.5
91.9
TOOL NUMBER
SOLAR GM 77113
4.500
4.5
QUIKDRIL-N
8.70
52.0
8.9
30000
4.4
.000
.000
.000
.000
75.5
.2
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units ............. - ..........
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0
GR MWD 10 API 4 1 68 4 2
ROP MWD 10 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 13956.5 14148 14052.2 384 13956.5
GR 24.5785 56.523 36.5946 279 13956.5
ROP 10.1572 965.039 74.2966 278 14009.5
Last
Reading
14148
14095.5
14148
First Reading For Entire File .......... 13956.5
Last Reading For Entire File ........... 14148
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
File Header
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER: 7
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 11
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 14096.0 14444.5
ROP 14148.5 14497.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G) :
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
01-MAR- 98
ISC 5.07 / ISC 5.07
DM .13 / GM 1.21/1.22
MEMORY
14498.0
14147.0
14498.0
83.2
87.0
TOOL NUMBER
SOLAR GM 78653
4.500
4.5
QUI KDRI L-N
8.70
51.0
9.0
30500
4.0
.000
.000
.000
.000
79.3
.4
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 11 API 4 1 68 4 2
ROP MWD 11 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 14096 14497.5 14296.8 804 14096
GR 17.9818 95.5153 39.9677 698 14096
ROP 46.7348 166.951 124.974 699 14148.5
Last
Reading
14497.5
14444.5
14497.5
First Reading For Entire File .......... 14096
Last Reading For Entire File ........... 14497.5
File Trailer
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.008
Physical EOF
File Header
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 12
DEPTH INCREMENT: .5000
FILE SUMUUkRY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 14446.0 15568.0
ROP 14499.5 15620.5
$
LOG HEADER DATA
DATE LOGGED: 04-MAR-98
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
ISC 5.07 / ISC 5.07
DM .13 / GM 1.21/1.22
MEMORY
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMS4) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
15621.0
14498.0
15621.0
80.8
91.3
TOOL NUMBER
SOLAR GM 78653
4.500
4.5
QUIKDRIL-N
8.60
58.0
8.8
31000
4.0
.000
.000
.000
.000
82.5
.4
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0
GR MWD 12 API 4 1 68 4 2
ROP MWD 12 FT/H 4 1 68 8 3
First Last
Name Min Max Mean Nsam Reading Reading
DEPT 14446 15620.5 15033.2 2350 14446 15620.5
GR 8.9208 205.144 75.634 2245 14446 15568
ROP 4.8574 2218.36 76.0294 2243 14499.5 15620.5
First Reading For Entire File .......... 14446
Last Reading For Entire File ........... 15620.5
File Trailer
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.009
Physical EOF
File Header
Service name ............. STSLIB.009
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.008
Comment Record
FILE HEADER
FILE NUMBER: 9
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 13
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 15568.5 15632.5
ROP 15621 . 0 15684 . 5
$
LOG HEADER DATA
DATE LOGGED: 06-MAR-98
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 89.1
MAXIMUM ANGLE: 89.2
ISC 5.07 / ISC 5.07
DM .13 / GM 1.21/1.22
MEMORY
15684.0
15621.0
15684.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GTkMP[A PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
TOOL NUMBER
SOLAR GM 77113
4.500
4.5
QUIKDRIL-N
8.60
46.0
7.9
31000
8.0
.000
.000
.000
.000
91.6
.2
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 13 API 4 1 68 4 2
ROP MWD 13 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 15568.5 15684.5 15626.5 233 15568.5
GR 24.4675 45.5961 33.6214 129 15568.5
ROP 12.9371 140.084 64.8444 128 15621
Last
Reading
15684.5
15632.5
15684.5
First Reading For Entire File .......... 15568.5
Last Reading For Entire File ........... 15684.5
File Trailer
Service name ............. STSLIB.009
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.010
Physical EOF
File Header
Service name ............. STSLIB.010
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.009
Comment Record
FILE HEADER
FILE NUMBER: 10
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 14
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 15633.0 15858.0
ROP 15686.0 15910.5
$
LOG HEADER DATA
DATE LOGGED: 07-MAR-98
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 88.0
MAXIMUM ANGLE: 94.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
ISC 5.07 / ISC 5.07
DM .13 / GM 1.21/1.22
MEMORY
15911.0
15684.0
15911.0
TOOL NUMBER
SOLAR GM 77113
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
4.500
4.5
QUIKDRIL-N
8.60
53.0
8.8
30500
6.0
.000
.000
.000
.000
.2
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 14 API 4 1 68 4 2
ROP MWD 14 FT/H 4 1 68 8 3
88.9
First
Name Min Max Mean Nsam Reading
DEPT 15633 15910.5 15771.8 556 15633
GR 26.1673 82.1923 43.7328 451 15633
ROP 10.8205 3937.5 258.893 450 15686
Last
Reading
15910.5
15858
15910.5
First Reading For Entire File .......... 15633
Last Reading For Entire File ........... 15910.5
File Trailer
Service name ............. STSLIB.010
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.011
Physical EOF
File Header
Service name ............. STSLIB.011
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.010
Contment Record
FILE HEADER
FILE NUMBER: 11
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 15
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 15859.5 16173.5
ROP 15913.0 16242.0
$
LOG HEADER DATA
DATE LOGGED: 08-MAR-98
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 89.9
MAXIMUM ANGLE: 91.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
ISC 5.07 / ISC 5.07
DM .13 / GM 1.21/1.22
MEMORY
16242.0
15911.0
16242.0
TOOL NUMBER
SOLAR GM 77113
4.500
4.5
QUI KDRI L-N
8.60
52.0
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN) :
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
8.9
30500
5.4
.000
.000
.000
.000
.2
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 15 API 4 1 68 4 2
ROP MWD 15 FT/H 4 1 68 8 3
98.3
First
Name Min Max Mean Nsam Reading
DEPT 15859.5 16242 16050.8 766 15859.5
GR 18.0191 92.1552 41.692 629 15859.5
ROP 22.2947 720.448 73.7385 659 15913
Last
Reading
16242
16173.5
16242
First Reading For Entire File .......... 15859.5
Last Reading For Entire File ........... 16242
File Trailer
Service name ............. STSLIB.011
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.012
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN) :
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.000
.4
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 16 API 4 1 68 4 2
ROP MWD 16 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 16174 16900 16537 1453 16174
GR 19.6926 190.79 45.2675 1349 16174
ROP 10.604 2257.03 68.6483 1316 16242.5
Last
Reading
16900
16848
16900
First Reading For Entire File .......... 16174
Last Reading For Entire File ........... 16900
File Trailer
Service name ............. STSLIB.012
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/09
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.013
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 98/04/09
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS
Services
Writing
Reel Trailer
Service name ............. LISTPE
Date ..................... 98/04/09
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing
Services
Library.
Library.
Scientific Technical
Scientific Technical
Physical EOF
Physical EOF
End Of LIS File
Sperry-Sun Drilling Services
LIS Scan Utility
Mon Apr 13 08:33:05 1998
Reel Header
Service name ............. LISTPE
Date ..................... 98/04/13
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical
Services
Tape Header
Service name ............. LISTPE
Date ..................... 98/04/13
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical
Services
Physical EOF
Comment Record
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
MWD RUN 1
AK-MM-80120
E. CRIBBS
D. BURLEY
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
R-32A PB1
500292241370
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
09-APR-98
MWD RUN 3
AK-M~-80120
E. CRIBBS
D. BURLEY
MWD RUN 4
AK-MM-80120
E. CRIBBS
D. BURLEY
32
12N
13E
699
1258
48.10
46.70
20.30
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
13.375 3340.0
9.625 11674.0
7.000 11693.0
4.750 12700.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUNS 1-5 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING GEIGER-
MUELLER TUBE DETECTORS (SOLAR 175 TOOL).
3. MWD RUNS 2 AND 5 MADE NO FOOTAGE AND A_RE NOT
PRESENTED.
4. MWD RUNS 1, 3, AND 4 REPRESENT WELL R-32APB1 WITH
API#: 50-029-22413-70.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 12700'MD,
8997'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED (SOLAR 175 GAMMA
RAY).
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 11630.0 12647.0
ROP 11692.0 12701.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
11630 0
11682
11687
11689
11694
11698
11727
11731
11734
11737
GR
11630.5
11682 5
11687 5
11690 5
11695 5
11699 0
11727 5
11731 0
11734.0
11737.5
EQUIVALENT UNSHIFTED DEPTH
11741.5
11750.0
11752 0
11754
11757
11760
11762
11764
11770
11774
11779
11782
11785
11788
11801
11814
11815
11821
11824
11829
11834
11837
11838
11839
11842
11845
11855
11856
11858
11859
12701
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
REMARKS:
11741.5
11750.5
11753.5
11756.0
11759.-0
11762.0
11763.5
11766.0
11770.0
11775.0
11779.5
11783.0
11786.5
11789.5
11800.5
11814.0
11815.0
11822.0
11826.5
11829.5
11834.5
11836.5
11837.5
11838.5
11841.0
11844.5
11852.5
11853.0
11855.0
11858.5
12700.0
BIT RUN NO MERGE TOP MERGE BASE
1 11693.0 12110.0
3 12110.0 12369.0
4 12369.0 12700.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
Name Min Max Mean Nsam
DEPT 11630 12701 12165.5 2143
ROP 3.2642 632.498 56.9903 2019
GR 21.6123 207.846 54.958 2035
First Last
Reading Reading
11630 12701
11692 12701
11630 12647
First Reading For Entire File .......... 11630
Last Reading For Entire File ........... 12701
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 11630.5 12056.5
ROP 11693.0 12110.0
$
LOG HEADER DATA
DATE LOGGED: 14-FEB-98
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
ISC 5.07 / ISC 5.07
DM .09 / GM 1.21
MEMORY
12110.0
11693.0
12110.0
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE ~D CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
27.0
75.3
TOOL NUMBER
SOLAR GM 78653
4.500
4.5
QUIKDRIL-N
8.60
46.0
8.6
28000
7.0
.000
.000
.000
.000
40.0
.3
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 1 API 4 1 68 4 2
ROP MWD 1 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 11630.5 12110 11870.2 960 11630.5
GR 24.2561 207.846 76.9073 853 11630.5
ROP 3.2642 632.498 75.8917 835 11693
Last
Reading
12110
12056.5
12110
First Reading For Entire File .......... 11630.5
Last Reading For Entire File ........... 12110
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 12057.5 12314.0
ROP 12110.5 12368 . 0
$
LOG HEADER DATA
DATE LOGGED: 17-FEB-98
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM A=NGLE: 81.3
MTkXIMUM ANGLE: 100.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY SOLAR GM 77113
$
ISC 5.07 / ISC 5.07
DM .09 / GM 1.21
MEMORY
12369.0
12110.0
12369.0
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE ,(IN):
DRILLER'S CASING.DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
4.500
4.5
QUIKDRIL-N
8.60
49.0
9.1
30000
4.8
.000
.000
.000
.000
.2
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 3 API 4 1 68 4 2
ROP MWD 3 FT/H 4 1 68 8 3
61.7
First
Name Min Max Mean Nsam Reading
DEPT 12057.5 12368 12212.8 622 12057.5
GR 21.6123 132.768 38.7923 514 12057.5
ROP 6.1499 121.945 38.5172 516 12110.5
Last
Reading
12368
12314
12368
First Reading For Entire File .......... 12057.5
Last Reading For Entire File ........... 12368
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUM~4ARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 12315.5 12646.0
ROP 12370.5 12700.0
$
LOG HEADER DATA
DATE LOGGED: 18-FEB-98
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 92.0
MAXIMUM ANGLE: 99.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA~Y SOLAR GM 78653
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 4.500
DRILLER'S CASING DEPTH (FT): 4.5
BOREHOLE CONDITIONS
MUD TYPE: QUIKDRIL-N
ISC 5.07 / ISC 5.07
DM .09 / GM 1.21
MEMORY
12700.0
12369.0
12700.0
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3): .
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
55.0
8.7
29000
4.2
.000
.000
.000
.000
.2
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0
GR MWD 4 API 4 1 68 4 2
ROP MWD 4 FT/H 4 1 68 8 3
67.2
First
Name Min Max Mean Nsam Reading
DEPT 12315.5 12700 12507.8 770 12315.5
GR 24.8604 132.155 38.6596 662 12315.5
RO? 6.5484 122.812 47.5714 660 12370.5
Last
Reading
12700
12646
12700
First Reading For Entire File .......... 12315.5
Last Reading For Entire File ........... 12700
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/04/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 98/04/13
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing
Services
Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 98/04/13
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Scientific Technical
Scientific Technical
Physical EOF
Physical EOF
End Of LIS File