1. Operations Performed
Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0
Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program ❑
Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0
2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 216-081
3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0
AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21950-03-00
7. Property Designation(Lease Number): ADL 0028262 8. Well Name and Number: PRUDHOE BAY UNIT Z-23C
9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools:
PRUDHOE BAY,PRUDHOE OIL
11.Present Well Condition Summary:
Total Depth: measured 11927 feet Plugs measured feet E■/�;E I V E D
true vertical 8984 feet Junk measured feet RECEIVED
Effective Depth: measured 11538 feet Packer measured 8711 feet MAY 01 2017
true vertical 8955 feet Packer true vertical 8535.11 feet
AOGCC
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20"91.5#A-53 30-110 30-110 1533 515
Surface 2618 13-3/8"68#L-80 28-2646 28-2646 5020 2260
Intermediate 6692 9-5/8"47#L-80 26-6718 26-6699 6870 4760
Production
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation Depth: Measured depth: 10196-10260 feet 10352-10384 feet 10384-10448 feet 10490-10935 feet 10975-11300 feet
11464-11494 feet
True vertical depth: 8991-8992 feet feet 8991-8990 feet 8990-8987 feet 8985-8972 feet 8971-8953 feet
8952-8953 feet
Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 24-8767 24-8585
Packers and SSSV(type,measured and See Attachment See Attachment See Attachment
true vertical depth)
12.Stimulation or cement squeeze summary:
Intervals treated(measured):
SCANNED MA ' i 5 2017.
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 248 559 24 721 261
Subsequent to operation: 412 651
326 909 263
14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service 0 .Stratigraphic 0
Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL ❑
Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP El SPLUG ❑
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
N/A
Authorized Name: Peru,Cale Contact Name: Peru,Cale
Authorized Title: Petroleum Eng' er `� Contact Email: Cale.Peru@bp.com
Authorized Signature: Date: 5////7 Contact Phone: +1 9075644522
Form 10-404 Revised 04/2017 VTL. 51/40/17_J`7- 1007 RBDMS u MAY - 3 2017
i//`�` Submit Original Only
• •
fia
Alaska Oil and Gas Conservation Commission
333 West Seventh Avenue
Anchorage, AK 99501-3572
RE: BP Exploration (Alaska), Inc.
Report of Sundry Well Operations Summary
April 28, 2017
To Whom it May Concern:
Attached please find the Report of Sundry Well Operations for Z-23C, PTD # 216-081
for Add Perforations.
Sincerely,
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Attachment: Form 10-404
BP Exploration (Alaska) , Inc.
P.O. Box 196612 Anchorage, AK 99519-6612
•
0
Lo 0 0 0 r O O
ROCOCO t
N c O O
r-
U
y M 0 0 c 0 0
i co N I-- d O co M
m r co CO I- _ CO CO
CO O L) N- r CO tf)
'ct O O 0) c- CO CO CO
CO CO I-- (O O) C) 6) Lo
N CO CO CO CO CO CO CO
H
N co r- io .-
c) CO CO to CO CA CO d
CO N N to to 10 CO O) N
CO CO CO CO CO
cU
GI (Y) O CO CO CO 0) O N- N-
E C) CO1 m(O I- C) CO N CA to N-
. N Nco cocoa) o) � co
ctim
1 1 1 1 1 1 1 1
Z
aLoNN- Cr) N-
O CO CO (O C) 'Cr C) v
CO N N CO CO CO CO 0) N
C M<
.Q M
1O Lo co LU
` co QM O CO c (b CO
C) Q JI 10 OJLcoMJMM �
Cl) �/ Na) to CO d. *k M N co co ap
coN cr) o) -c` zoC OO_
O Ch to f� N CO N
N M O i Imo.
M M N �
t
ar co CNI 00 CO CO CO
coCA OCO CO co O M O M N-
O N CO N N - ,- CO
W
' U
W W
cis
Z W W W W W W pp
O D H Z Z Z Z Z D
O (/) Z J J J J J F-
• •
Packers and SSV's Attachment
PRUDHOE BAY UNIT Z-23C
SW Name Type MD TVD Depscription
Z-23C PACKER 6571.6 6558.83 7" Baker LT Packer
Z-23C PACKER 8685 8512.27 3-1/2" Baker 45 KB Packer
Z-23C TBG PACKER 8710.63 8535.11 4-1/2" Baker S-3 Hydro Set Packer
Z-23C PACKER 8758.32 8576.98 4-1/2" Baker KB LT Packer
• •
v o no
rna) _o
o m „_ 0
-0 O N p D N = N N
a) 0-) 0 oU O L
0)O 0 CO
�- a CS U
0 N 0 Q N off N 0_ O
N O L L L
6 0)M x "00 a) o- a a) °6 cn
nw = m o aim o = Q
MU
(a 2 D ca'' O O
Q) co c -0
-o c 12 I- a) � - 4t -0
E a)
a) CC j CO a ,_ o_ C ,m
_ M fn ls- 06 co v' .fn
O O -A- O U O a)
Y o_}, X O D 't
I' O U - _c M a) N O
0 U ' O a) 7-.„ U) i.-4.5. d _� co a
L \
co
O a) O Q E O N ¢ U s
= O O D U _ U) x o 0 co a) z.
O V > J O Q- NE O c' E N o I- _ccB
• McC % off �O U) :LI a m . ' co E
ca N < N rnQ I D . > O 3 _ . a a) E m
L
m Q
Q -, ,- c 0) Q_ `t •
C �' N f- Q- U) F'
O - O u a) c 4- a) "O 0 ` O • V 0 'O
Z CO J 2 'p) O d 2 c 0 'O - CO a) _5
Q O) 0 U N w 0 U a) i w O O LL
`�CD fi) O "0 J .t N M -0 V' > Co 0 d 0-
• Q Q= coo 0 O X _c (Y) 0 ONO' N 0
O W -0 N o = CL
Q O N O� Qm 2 O 't co
< N r --§
i Q p d -TO - L 0_0_
O O >CO I I � O > _ . Q c6 o � Nel � Q E
c L
Q. = O m N ~ � a) co di
O Q N O a.d 0 c Q 0 .c x 00 • o c
C = O > O O't D a) * O t w •O CV � ~ O — a)
>, (t E o o 2 E0cLo in y -5; O cn
▪ CL = Q2 � • = CV v 'ot0 oO tIN c 00 aL) a)
o UmUo2 5 ) a) OQai - -(S ,t -' c . CO
CO-
rn- a) . - - a o- * O a Q 06 aj , o o N
N- -in � O -0 0- cn N 0 O N to - CV .c L 0..Co Cr)t 13 o - a) O J
• 0).- 0) N (I) r- = co U) Lo:7:
co O CL.
o_C)) CC rn Lo a) r, m Q co U
i O = 0)O 2_.) i E 0 O ZD X 2 X d V O my g - .0) 0E t 0
L v J p. N Q , Q- N O <V � 5 ,- — 2 O 0) N Y
k L �*k C c0 Q� � VL O N a) QL_ � L � � .�
3 a) 3 3 co C/) > *k c
D 1- 2 cD .e o � � c0 co $ o cD .<0 O ..4-
1- 1031— �
LO :47 UUL .ELE « 0 ( v O— c N * UILL * co �
W
F-
r-O r- N- r-
N N C O O
5I-
( N . d' In
_ N OM M
CO N
I- co M M 4
0
Q
rRik- 4-1/16'CM/ 0 .
AELIHEA D= FPC SAAOTES: WELL ANGLE>70°@ 9236%
' ACTUATOR= BKR MD€EL C Z-23C -*CHROME TBG&LNR***MAX OLS:43.5°@ 9607'.
OKS.ELEV= 9t7'
REF ELB/= 81.06'
SF ELEV= 55 36' [ 2206' _I-1_4-1/2"HES X NP,0=3.813'
KOP= 3100I I
GAS LFT luVOCRELS
IIx Angle= 95°0 11056'
I Datum MD= 9177'
Z1• 111111L, ST MD TVD DEN TY PE V LV LATCH FORT' CM th
Ct=-ND= 880
6 3095 3095 1 DONE RK 16 1 21 11/16,a0 SS
WIG
5 4995 4994 1 MMG DOW IRK 16 12/11/161
13-318'CSG,68#,L-80,ID=12.415" H 2667' 4 6386 6379 13 TIG DOME RK 16 12/11/16'
3 7451 7373 21 KBG2 DMI' BK 0 03/20116i
2 8222 8083 22 KBG2 COME BK 16 12/11/161
i
1 8580 8417 23 KBG2 SO BK 22 12/11:16,
i
Minimum ID =2.31" @ 8696'
6565' —9-5/8-X r BKR ZXP L1P
2-718" X NIP IN LTP w!PTSA w/TEBK SLV,ID=6,28"
6679' H9-5/8"X r BKR HMC HGR w/R NIP,ID=6 18"
_.a
MLLOUT WINDOW(Z-2313) 6718 -6734'
1/vECHANICAL VM4rsTocK(08/25/04) i 6218' 1
8686 —45 KB LTP w/PTSA(11/05/162J
9-5/8"CSG,47#.L-80,ID=8.681' H —6718' i
'
8690' J—4-1/2"HES X NP,D=3.813'
I I 8692' —13.70"DEPLOY SLV,ID=3.007_I
TOLJTOC —1 —8692' ] :' I 8686' —12-7/8-X NP,ID=2.31"
: 8710' H7"X 4-1/2"BKR S-3 PKR,ID=3870"BEHIND CT 1
8713' i---I3-1/2"OTIS X NIP,ID=2.812_1
8734' 4-1/2"HES X NP,ID=3.813'
q
8747' —7'X 5"BKR ZXP LNR TOP PKR
r' w fT1E8K SLV,0=4 360"
I LI;'....-----------1 8766' —1_4-1/2-HES XN NIP MLLED TO 3.80"(08/19116) j
4-1/2"TBG,12.6#,13CR VAM, —1 8767' 1
8766'
0152 bpf,D 3 958' Hr X 5"BKR HMC HGR w/R NP.ID=4.25"
= T
* 0.• 8267' _44-1/2"VVLEG.ID=3.958" BEHIND
1
3-1/2"LNR,9 3#,13CR-85 Sit, —1 8899' h 8176' —15'x 4-1/2"X0,D=3,99" CT LNR
•
.0087 bpf,ID=2.992" . -•
Jr LNR 26#,L-80 BTC-M, H 8913' _A ,'-, .4
% k ,
FT-L1819' 3-1/2"X 3-3/16'XO,ID=2,786"
9164' —14-1/2'MARKER JT w/RA TAG 1
1 0383 bpf,ID=6.276' It
14-1/2"BKR MONOBORE WHPSTOCK(10119/16) — 9280' ...$;. MLLOUT WINDOW(Z-23C) 9280'-9287'
*
14-1/2"LNR, 12.6#,L-80 BTC-M, —1 —9280' — _ ,
: 3677' ---IPUPJT w/RA TAG I
I 0152 bpf,10=3.958' * ...
I *- '
3-1/4'LNR,6.60,13CR-85 TCI, 0079 bpf,ID=2.85" 1-1 9947' 4 *
__ _____ __________.____.____
: 4' se4 ' H 3-3/16"X 2-7/8'X0,ID=2.377"
.
PERFORATION SUMMARY --..
7''
REF LOG:MM)-GR LOG ON 10/27/16
• ANGLE AT TOP FERF- 89° 0 10196' • II
P4te Refer to Production DB for historical pert data
SIZE SPF 1 INTERVAL OprliSqz DATE
2" 6 10196 -10260 0 03/31/17 /...: 1
' 2° 6 10352-10448 0 03/31/17
2" 6 10495- 10940 0 10/29/16 .p., .
2" 6 10980- 11305 0 10/29/16
2' 6 11464- 11494 0 03/30/17 . It.' 11538- —PB1D
•' .
io o 1
12-718'LNR,6.5s,13CR-85 11-1511. 0058 bpf.D=2.441' H 11663' i
DA it 1 REV BY ODOM:NTS DATE REV BY DC/WANTS PRUDHOE BAY LNT
10118/891 FI-I ORIGINAL COMPLETION 11/15/16 JI1J..0.43 ADDED REF EP./ VVELL Z-23C
05/05/951 UNDER SIDETRACK(Z-23A) 11/17116 JTG1,11143 SET LTP w/PTSA(11/05/16) PEWIT No .2160810
07/08/03 DAV/KK SDTRCK ATTEMPT(Z-234L1 12/29/16 CJINYJM) GLV 00(12/11/16) AF1ND 50-029-21950-03
09119/041 016 SIDETRACK(Z-23B) 04/03/17 CLW/11413 A OFERFS(03/30-31/17) SEC 19,711N, R12E,4560'r•ISL&3214'WEL
10/30/16 NOREIC2 CTD(Z-23C) ..
11/02/16 JUJMD 'FINAL ODE AFFROVAL _ BP Exploration(Alaska)
DATA SUBMITTAL COMPLIANCE REPORT
2/21/2017
Permit to Drill 2160810 Well Name/No. PRUDHOE BAY UNIT Z -23C
MD 11927 TVD 8984 Completion Date 10/30/2016
REQUIRED INFORMATION
Mud Log No 11-
DATA INFORMATION
Types Electric or Other Logs Run: MWD/GR/RES
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
ED C 27751 Digital Data
ED C
ED C
ED C
ED C
ED C
ED C
ED C
ED C
ED C
ED C
ED C
ED C
AOGCC'
27751 Digital Data
27751 Digital Data
27751 Digital Data
27751 Digital Data
27751 Digital Data
27751 Digital Data
27751 Digital Data
27751 Digital Data
27751 Digital Data
27751 Digital Data
27751 Digital Data
27751 Digital Data
Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21950-03-00
Completion Status 1-011-
Samples
-OIL
Samples Nov,,
Current Status 1-0I1- UIC No
Directional Survey Yes
(data taken from Logs Portion of Master Well Data Maint)
Log Log Run Interval OH/
Scale Media No Start Stop CH Received
Comments
8882 11927 11/14/2016
Electronic Data Set, Filename: Z-
23C_LW D_FINAL _FI ELD_COMPOSITE_27OCT
2016 BHI CTK.las
11/14/2016
Electronic File: 10043536 7-21-16.pdf '
11/14/2016
c
Electronic File: 13008719 7-20-16.pdf
11/14/2016
Electronic File: USR 10043536 Post Run 03.pdf ,
11/14/2016
Electronic File: USR 10043536 Post Run 08.pdf -
11/14/2016
Electronic File: USR 13008719 Pre Run xx.pdf
11/14/2016
Electronic File: Z-
23C_Postrun_04_USR_13008719.pdf -
11/14/2016
Electronic File: Z-
23C_Postrun_06_USR_10043536.pdf '
11/14/2016
Electronic File: Z-
23C_GR_Res _ 270CT2016_MD_FINAL_FIELD_ .
BHI_CTK.cgm
11/14/2016
Electronic File: Z-
23C_GR_Res _270CT2016_TVDSS_F I NAL_FI E
LD_BHI_CTK.cgm
11/14/2016
Electronic File: Z -
p
23C_GR_Res_270CT2016_MD_FINAL_FIELD_ r
BHI_CTK.pdf
11/14/2016
Electronic File: Z-
le
23C_GR_Res _270CT2016_TVDSS_FINAL_FIE
LD_BHI_CTK.pdf
11/14/2016
Electronic File: Z -23C Final Survey.pdf
Pagc I of 3
Tuesday, February 21, 2017
DATA SUBMITTAL COMPLIANCE REPORT
2/21/2017
Permit to Drill 2160810 Well Name/No. PRUDHOE BAY UNIT Z -23C Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21950-03-00
MD
11927
TVD 8984
ED
C
27751
Digital Data
ED
C
27751
Digital Data
ED
C
27751
Digital Data
ED
C
27751
Digital Data
ED
C
27751
Digital Data
ED
C
27751
Digital Data
ED
C
27751
Digital Data
ED
C
27751
Digital Data
Completion Date 10/30/2016 Completion Status 1 -OIL
Log C 27751 Log Header Scans
Well Cores/Samples Information:
Name
INFORMATION RECEIVED
Completion Report Y
Production Test Informatio Y NA
Geologic Markers/Tops O
COMPLIANCE HISTORY
Completion Date: 10/30/2016
Release Date: 7/7/2016
Description
Interval
Start Stop
Directional / Inclination Data l./
Mechanical Integrity Test Information Y AG
Daily Operations Summary
Date
Comments
0 0
Current Status 1 -OIL UIC No
11/14/2016
Electronic File: Z -23C Final Survey.txt
11/14/2016
Electronic File: Z -23C Final Surveys.csv
11/14/2016
Electronic File: Z -23C Final Surveys.xlsx
11/14/2016
Electronic File: Z-23C_25_tapescan_BHI_CTK.txt
11/14/2016
Electronic File: Z-23C_5_tapescan_BHI_CTK.txt
11/14/2016
Electronic File: Z-23C_output.tap
11/14/2016
Electronic File: Z-
23C_GR _Res 270CT2016 MD_FINAL_FIELD_•
BHI CTK.tif
11/14/2016
Electronic File: Z -
23C_ GR—Res —
Res_ 270CT2016_TVDSS_FINAL_FI E
LD BHI CTK.tif
2160810 PRUDHOE BAY UNIT Z -23C LOG
HEADERS
Sample
Set
Sent Received Number Comments
Mud Logs, Image Files, Digital Data Y 49
Composite Logs, Image, Data FilesYO
Cuttings Samples Y 7b
Core Chips Y
Core Photographs Y
Laboratory Analyses Y
AOGCC Page 2 of 3 Tuesday, February 21, 2017
DATA SUBMITTAL COMPLIANCE REPORT
2/21/2017
Permit to Drill 2160810 Well Name/No. PRUDHOE BAY UNIT Z -23C Operator BP EXPLORATION (ALASKA) INC.
MD 11927 TVD 8984 Completion Date 10/30/2016 Completion Status 1-0I1- Current Status 1-011-
Comments:
-OILComments:
Compliance Reviewed By:
Date:
API No. 50-029-21950-03-00
UIC No
AOGCC Page 3 of 3 Tuesday, February 21, 2017
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMIS" `N
WELL JMPLETION OR RECOMPLETION REPG AND LOG
1a. Well Status: Oil RI " Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
1b. Well Class:
20AAC 25.105 20AAC 25.110
GINJ 11WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One
Development R1 Exploratory El
Service ❑ Stratigraphic Test ❑
2• Operator Name:
6. Date Comp., Susp., or Aband.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
10/30/2016
216-081'
3. Address:
7. Date Spudded:
15. API Number:
P.O. Box 196612 Anchorage, AK 99519-6612
10/20/2016
50-029-21950-03-00
4a. Location of Well (Governmental Section):
B. Date TD Reached: 0-
16. Well Name and Number:
4e2 948 10/2 -7h -a'
PBU Z -23C °
9 Ref Elevations KB 81.06
17. Field/Pool(s):
Surface: 720' FNL, 1739' FWL, Sec. 19, T11N, R12E, UM
Top of Productive Interval: 458' FSL, 1545' FWL, Sec. 18, TI 1N, R12E, UM
GL 56.02 • BF 55.36
PRUDHOE BAY, PRUDHOE OIL
10. Plug Back Depth(MD/TVD):
18. Property Designation:
Total Depth: 540' FNL, 2770' FWL, Sec. 19, T11N, R12E, UM
11538'/ 8955'
ADL 028262 -
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11. Total Depth (MD/TVD):
19. Land Use Permit:
Surface: x- 599459 ° y- 5959360 Zone - ASP 4
11927'/8984' •
85-009
TPI: x- 599250 y- 5960535 Zone - ASP 4
12. SSSV Depth (MD/TVD):
2()Thickness of Permafrost MD/TVD:
Total Depth: x- 600488 y- 5959554 Zone - ASP 4
None
1900' (Approx.)
5. Directional or Inclination Survey: Yes 0 (attached) No ❑
13. Water Depth, if Offshore:
21, Re-drill/Lateral Top Window
MD/TVD:
Submit electronic and printed information per 20 AAC 25.050
N/A (ft MSL)
9280'/ 8917'
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MWD / GR / RES
23. CASING, LINER AND CEMENTING RECORD
CASING
WT. PER
FT.
GRADE
SETTING DEPTH MD SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
AMOUNT
PULLED
TOP BOTTOM TOP BOTTOM
20"
28' 108' 28' 108'
13-3/8"
68#
L-80
27' 2647' 27' 2646'
17-1/2"
3684 cu ft Permafrost
9-5/8"
47# 1
L-80
25' 6718' 1 25' 6699'
12-1/4"
1894 cu ft Class'G'
7"
26#
L-80
6565' 8913' 6552' 8707'
8-1/2"
488 cu ft Class'G'
4-1/2"
12.6#
L-80
8747' 9280' 6552' 8707'
6-1/8"
281 cu ft Class 'G'
3-1/2"x3-1/4"
x2-7/8"
9.3#/6.6#
/6.5#
13CrB5
8685' 11553' 8512' 8956'
4-1/4"
96 sx Class'G'
24. Open to production or injection? Yes R1 No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number):
GRADE DEPTH SET (MD) PACKER SET (MD/TV
4-1/2", 12.6#, L-80 8767' 8710'/ 8535'
2" Gun Diameter, 6 spf
10495'- 10940' 8985'- 8972' "
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
10980'- 11305' 8970'-8952 '
Was hydraulic fracturing used during completion? Yes ❑ No D
Per 20 AAC 25.283 (i)(2) attach electronic and printed
information
COMPLETION NOV2 2016
DATE
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
Ib/54 Z�tP
2500' Freeze Protect w/ 38 Bbls Diesel
VERIFIED A GC
27. PRODUCTION TEST
Date First Production: November 22, 2016
Method of Operation (Flowing, gas lift, etc.): Gas Lift
Date of Test:
11/24/16
Hours Tested:
8
Production for
Test Period -►
Oil -Bbl:
320
Gas -MCF:
358
Water -Bbl:
57
Choke Size:
128
Gas -Oil Ratio:
1121
Flow Press Tubing 280
Casinq Press:
1700
Calculated
24 Hour Rate -♦
Oil -Bbl:
959
Gas -MCF:
1075
Water -Bbl:
172
Oil Gravitv - API (corr):
25.7
Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only
►ATL zlr� l`�- Cb�� RBDMS Z- - DrEC - b 2016 C-6, , t .i 7
28. CORE DATA Conventional Core(s) Yes ❑ No a Sidewall Cores Yes ❑ No Q
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Permafrost - Top
Well Tested? Yes ❑ No 0
Permafrost - Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
9168'
8877'
separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Sadlerochit - Zone 4B
9168'
8877'
Kicked off from Parent Well
9280'
8917'
(Z -23B)
Formation at total depth:
Zone 4B
9168'
8877'
31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post -Rig Work, Survey, Cement Report, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production
or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact: Leemhuis, Jacob Email: Jacob.Leemhuis@bp.com
Printed Name: Joe Lastu a Title: Drilling Technologist
Signature: /A Phone: +1 907 564 4091 Date:
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1 b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 11/2015 Submit ORIGINAL Only
TREE= 4-1/16" CIW
VVELLFEAD=
FMC
ACTUATOR =
BKR MODE C
'OKB. ELEV =
91.7*
'REF ELEV =
81.06"
BF. ELEV =
5536"i
-KOP=
3 1 100'
Max Angle =
95- @ 11056'
Datum Mu
9177'
Datum TVD =
8800' SS
13-318' CSG, 68#, L-80, ID = 12415- ]--A 2657-
IMinimum ID = 2.31" 0 86961
2-7/8" X NIP IN STP w1PTSA
j9 -5/8 - CSG, 47#,L -80,K)=8-681- I
4-1/2- TBG, 12,6#, 13CRVAM, 8767'
.0152 bpf, 1) = 1958*
3-1/2-LNR, 9.3#,13CR-86STL,
8
.0087 bpf, ID = 2-992"
DEV
7- LNR, 26#, L-80 BTC -M,
VLV
.0383 bpf, ID = 6276'
PORT
DATE
1/2- BKR MONOBORE WHIPSTOCK (10/19/16) _]—E__928OL
4-1/2- LNR 12.6#, L-80 BTC -M,
0152 bpf, ID = 3.958*
1
L3-1/.4-LNR, 6.6#,13CR-SSTCR .0079bpf, ll)=2.SS' ]-J9947'
PERFORATION SUMMARY
REF LOG, WkID-GR LOG ON 10/27116
ANGLEAT TOP PERF 93- @ 10495'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL OpniSqz -DATE
2'
6 10495 - 10940 0 10129116
6 10980 - 11305 0 10/29/16
ZSAFE OTES: WELL ANGLE> 700 @ 9236'.
-23C ***CHK,.,tAE TBG & LNR***MAX DLS: 43.5* @ 9607'.
PBTD 15Z�8
2-718"LNR, 6.5#,13CR-85TF1511,.0058bpf, ll)= �.441' 11-663'
2206'J—{a-112" HESX�NFID��3.813*
GAS LIFT MANDRELS
ST
MD
TVD
DEV
TYPE
VLV
LATCH
PORT
DATE
6
3095
3095
1
MMG
DOW
RK
16
11/06/16
5
4995
4994
1
MMG
SO
RFC
20
11/06/16
4
6386
6379
13
MMG
DW
RK
0
03120/16
3
7451
7373
21
KBG2
DW
RK
0
03120/16
2
8222
8083
22
KBG2
DW
BK
0
03120116
1 18580
84171
23
1 KBG2
1 DMY
I BK
0
08102/11
6W5* 19-5/8" X 7- BKR ZXP LTIP
w fTEBK SLV, ID = 6.28"
9-5/8" X 7' BKR HMC HGR w /R NIP, ID = 6,18"
I MILLOUT WINDOW (Z -23B) 6718- - 6734'
t---860� --4�LTP
�W/j
FEV BY
COMMENTS
[71�67:9:2�*-J3.7�0-DEPLO�'��L�.
11) �=3-00"
--R�-7/8" X NP, �ID= 2 �3-r
8710"7"-1/2*
�BKR S-3 �WJI- ID �=3-870" 13MIND CT
8713*
UNDER SIDETRACK (Z -23A)
11/15116
.!I= �3-31 3*
874
7*X5'BKR ZXPLNR TOP PKR
DAV/KK SDTRCK ATTEMPT (Z-23AL1
wnr=BK SLV, ID = 4.360"
JTG/JMD
SET LTP w /PTSA (11/05116)
8766'�-J�5
BKR HMC HG_R w tR NT, K) = 4,25'
�674
112" BEHIND
8776-
CT LNR
9164'
4-112" MARKER JT w /RA TAG
MILLOUT WINDOW (Z -23C) 9280- - 9287'
9677- 1 PUP JTw/RA TAG
9947* 1— 3-3/16" X 2-718* XO, 0) = 2.377"
DATE
REV BY COMME111TS
DATE
FEV BY
COMMENTS
10118189
FH ORIGINAL COMPLETION
11/02(16
JUJMD
FINAL ODE APPROVAL
05106195
UNDER SIDETRACK (Z -23A)
11/15116
JNLIJMD
ADDED REF ELEV
07108103
DAV/KK SDTRCK ATTEMPT (Z-23AL1
11/17/16
JTG/JMD
SET LTP w /PTSA (11/05116)
09119/04
D16 SIDETRACK (Z -23B)
11/17116
JTG/JMD
GLV CIO (11/06116)
1101301161 NORDIC2 CTD (Z -23C)
I
111/01/16
JMD DRLG FiQ CORRECTIONS I
I
I
PRLCHOE BAY UNIT
VAIL Z -23C
PERmrr No: 02160810
API No: 50-029-21950-03
SEC 19, T11K R12F- 4560'NSL & 3214'Wa
BP Exploration (Alaska)
North America - ALASKA - BP Page 1 of 21
Operation Summary Report
Common Well Name: Z-23
AFE No
Event Type: RE-ENTER- ONSHORE
(RON)
Start Date: 10/16/2016 End Date: 10/27/2016
X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay
Site: PB Z Pad
Rig Name/No.: NORDIC 2
Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA
UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From
- To
Hrs
Task
Code NPT NPT Depth Phase
Description of Operations
—
(hr)
(usft)
10/16/2016 09:00
09:30
0.50
MOB
P PRE
PREP TO JACK UP RIG AND MOVE
09:30 -
09:50
0.33
MOB
P PRE
PJSM WITH ALL INVOLVED PARTIES.
DISCUSS TIGHT TURN COMING OFF WELL
-TESTED AND VERIFIED ESD WAS
FUNCTIONALAND IS MANNED BY
TOOLPUSHER
-VERIFIED 12 X 12 WHEEL CHOCK IN PLACE
-ASSIGNED SPOTTERS TO AREA OF
RESPONSIBILITY
-AGREED ON STOP WAS THE COMMAND TO
STOP RIG.
-PERFORMED RADIO CHECK PRIOR TO
MOVING RIG.
-DISCUSSED WITH CREW THAT THERE WAS
NO BPV INSTALLED
-VERIFIED S-103, S-107 & S-111 SHUT IN,
DEPRESSURED TO HEADER PRESSURE AND
ALL TREE & CASING VALVES ARE LOTO
-VERIFIED S-113 TREE AND CASING VALVES
ARE SHUT IN
09:50
10:10
0.33
MOB
P PRE
_
JACK UP RIG AND MOVE OFF S-113
10:10
11:00
0.83
MOB
P PRE
RIG STAGED ON PAD, PU RIG MATS AND
CELLAR T -MATS
WELL WORK TRANSFER FORM CLOSED OUT
WITH S -PAD OPERATOR
S-103, S-107 & S-111 LOTO'S REMOVEDAND
CASING VALVES OPENED BY PAD OP
TOOL PUSHER AND DRILLER PERFORMING
ROUTE DRIVE WHILE LOADING MATS
11:00
13:45
2.75
MOB
P PRE
MOVE RIG FROM S -PAD TO MOBILE PAD
CORNER AND SET RIG DOWN WHILE TOOL
SERVICES MOVES RIG MATS TO THE FRONT
OF THE RIG
13:45
18:00
4.25
MOB
N WAIT PRE
RIG STAGED AT MOBILE PAD CORNER
WAITING ON RIG MATS TO BE MOVED AHEAD
OF THE RIG
DETERIORATING ROAD CONDITIONS
REQUIRE RIG MATS TO BE USED FOR RIG
MOVE.
18:00 -
00:00
6.00
MOB
N WAIT PRE
CONTINUE MOVING MATS AHEAD OF RIG.
RIG IS PARKED AT MOBIL PAD ENTRANCE.
CREW CONTINUES HOUSEKEEPING AND
MAINTENANCE TASKS.
10/17/2016 00:00
08:20
8.33
MOB
N WAIT PRE
STAGE RIG AT MOBIL PAD, WAIT FOR RIG
MATS TO BE PLACED AHEAD OF RIG.
CREW CONTINUES HOUSEKEEPING AND
MAINTENANCE TASKS.
BRUSH AND OIL 1" CSH IN THE PIPE SHED.
COMPLETE RIG MOVE CHECKLISTAND
CRITICAL ITEMS INSPECTION CHECKLIST.
08:20
10:00
1.67
MOB
P PRE
RIG MATS ARE READY MOVE RIG TO Z -PAD
ACCESS ROAD
10:00
15:00
5.00
MOB
P PRE
RIG STAGED AT Z -PAD ACCESS ROAD, WAIT
FOR RIG MATS TO BE PLACED WHERE
NEEDED
Printed 11/7/2016 11:10:01AM "All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 2 of 21
Common Well Name: Z-23
20:30
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 10/16/2016 End Date: 10/27/2016
X3-017YD-C: (3,155,216.00 )
Project: Prudhoe Bay
Site. PB Z Pad
MOB
Rig Name/No.: NORDIC 2
Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA
UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT NPT Depth Phase
Description of Operations
(hr)
(usft)
15:00 18:00 3.00
MOB P PRE
RIG MATS ARE IN PLACE, CONTINUE MOVE
TO Z -PAD
18:00 18:30 0.50
MOB P PRE
RIG IS ON Z -PAD POSITION RIG TO PULL
18:30
20:30
2.00
MOB
P
20:30
00:00
3.50
MOB
P
10/18/2016 00:00 - 02:45 2.75 MOB P
02:45 - 10:45 8.00 BOPSUR P
10:45 11:15 0.50 CONDHL P
11:15 11:45 0.50 CONS P
OVER WELL.
CONDUCT PJSM FOR PULLING OVER THE
WELL.
DISCUSS TESTING AND MANNING ESD WHILE
PULLING OVER WELL.
DISCUSS USE OF CHOCK BLOCK AND RADIO
CHECKS, EVERYONE UNDERSTANDS THE
STOP COMMAND.
ESD FUNCTION AND PULLOVER WITNESSED
BY WSL, TOURPUSHER AND TOOLPUSHER.
PULL RIG OVER WELLAND SET DOWN.
RIG ACCEPTED 18:30.
PRE RIG UP, START SPOTTING AUXILIARY
EQUIPMENT.
CYCLE TREE VALVES AND INSTALL FUSIBLE
CAP, CAP WITNESSED BY WSL.
GET GOOD LEAK TIGHT TEST ON SWAB AND
MASTER VALVES.
PRE PJSM WITH CH2 DRIVERS FOR LIFTING REEL
UP.
LIFT REEL UP AND SECURE IN THE REEL
FRAME.
INSTALL 1502 LINE INSIDE REEL.
SIMOPS: CONTINUE REMOVING TREE CAP,
INSTALLING BOPS.
ASSEMBLE GOOSENECKAND STRIPPER.
PRE INSTALL GRAPPLE AND PULL TEST.
- PULL CTACROSS PIPE SHED ROOF AND
INTO INJECTOR.
SIMOPS: CONTINUE INSTALLING BOPS.
CONDUCT H2S RIG EVAC EXERCISE WITH
BEZO_LD CREW, AND A_AR AFTERWARDS.
PRE SHELL TEST BOPS, GOOD.
- BEGIN BOP TEST AS PER AOGCC AND BP
REGS.
- TEST WITNESS IS WAIVED BYAOGCC
REPRESENTATIVE CHUCK SCHEVE.
- FUNCTION BOP RAMS FROM BOTH REMOTE
STATIONS, OK.
TEST ALL RAMS AND CHOKE VALVES @ 250
/ 3500 PSI.
TEST ANNULAR PREVENTOR @ 250 / 2500
PSI.
- TEST (2) FLOOR SAFETY VALVES @ 250 /
3500 PSI.
- PERFORM DRAWDOWN TEST ON
ACCUMULATOR,
RIG DOWN TEST EQUIPMENT.
(1) FAIL/ PASS ... CHOKE VALVE #1 INITIAL
TEST FAILED, GREASED AND FUNCTIONED
AND PASSED_ RE TEST.
PRE PJSM. CIRCULATE COIL TO FRESH WATER.
PRE PJSM. BOOT ELINE.
- INJECTOR ON WELL, CHECK TREE BOLTS
FOR PROPER TORQUE.
Printed 11/7/2016 11:10:01AM 'All depths reported in Drillers Depths`
North America - ALASKA - BP Page 3 of 21
Operation Summary Report
Common Well Name: Z-23 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016 X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (us -ft)
11:45 - 12:00 0.25 CONS P PRE CONDUCT RIG EVACUATION DRILL H2S
12:00
- 13:00
1.00
CONS
P
13:00
- 14:30
1.50
CONS
P
14:30
- 15:00
0.50
CONS
P
1500
- 15:45
0.75
CONDHL
P
15:45
18:00
2.25
CONDHL
P
18:00
- 21:30
3.50
CONDHL
P
21:30 - 00:00 2.50 CONDHL P
10/19/2016 00:00 - 02:30 2.50 BOPSUR P
RELEASE IN CELLAR.
- ALL HAND MUSTERED AND ACCOUNTED
FOR... (4) MINUTES TO MUSTER AND HEAD
COUNT.
- CONDUCT AAR. WIND DIRECTION
ACCOUNTED FOR, TRUCK DRIVERS
MUSTERED ON OTHER SIDE OF RIG.
PRE PJSM. PRESSURE TEST PACK OFF AND
INNER REEL.
- PRESSURE TEST STANDING IRON AND
INNER REEL IRON,
PRE PJSM. PUMP SLACK INTO REEL.
CUT 266' OF COIL.
PRE PJSM. MAKE UP CTC AND PULL TEST TO 45K,
GOOD.
- PRESSURE TEST TO 250 / 3500 PSI, GOOD
TEST.
PRE PJSM. CIRCULATE THE COIL TO MUD.
PRE PJSM. HEAD UP WITH BAKER.
MAG E LINE - 550 / 52
PRESSURE TEST BAKER FLOATS, 250/3500
PSI, OK.
- REMOVE TEST PLUG.
PRE STAB ON AND PT BPV LUBRICATOR.
DIFFICULT TO LATCH INTO PLUG.
REMOVE BPV LUBRICTOR AND INSPECT
PULLING TOOL, LOOKS OK.
STAB ON WITH BPV LUBRICATOR AGAIN AND
PT.
PRE PT BPV LUBRICATOR A SECOND TIME.
CONTINUE TO TRYAND ENGAGE PULLING
TOOL.
SHIFT CHANGE FOR BPV CREW.
CONTINUE TRYING TO ENGAGE THE PULLING
TOOL, ABLE TO GET IT.
PULL TWC ABOVE TREE VALVES, ABOUT 560
PSI.
CLOSE MASTER VALVE AND BLEED OFF
PRESSURE TO TIGER TANK.
FILL TREE WITH MEOH TO BPV LUBRICATOR
TO PURGE ANY RESIDUAL GAS.
CLOSE SWAB VALVE, REMOVE BPV
LUBRICATOR.
PRE CONTINUE PULLING TWC. GOT IT ON THE
SECOND ATTEMPT.
CLOSE MASTER VALVE AND BLEED OFF
PRESSURE TO TIGER TANK.
FILL TREE WITH MEOH TO BPV LUBRICATOR
TO PURGE ANY RESIDUAL GAS.
CLOSE SWAB VALVE, REMOVE BPV
LUBRICATOR.
OFFLOAD TWC LUBRICATOR AND PULLLING
TOOLS.
Printed 11/7/2016 11:10:01AM *All depths reported in Drillers Depths*
North America - ALASKA - BP Page 4 of 21
Operation Summary Report
Common Well Name: Z-23 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016 X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (usft)
02:30 - 04:30 2.00 BOPSUR P PRE BULLHEAD KILL WELLAS PER OCN #1
04:30 - 06:00 1.50 BOPSUR P
06:00 - 07:15 1.25 BOPSUR P
07:15
- 08:10
0.92
STWHIP
P
08:10
11:30
3.33
STWHIP
P
11:30 11:45 0.25 STWHIP P
Printed 11/7/2016 11:10:01AM 'All depths reported in Drillers Depths`
PUMP 5 BBLS MEOH, 290 BBLS 1% KCL, 20
BBLS HI -VIS, 150 BBLS MUD.
FINAL WHIP IS 1710 PSI.
SHUT DOWN PUMP, ALLOW PRESSURE TO
BLEED OFF.
BLEED GAS CAP IN RISER OUT TO TIGER
TANK.
BLEED OFF ALL PRESSURE AND OBSERVE
6.5 BBLS BACK WITH SLOWLY DECREASING
RATE.
NOW FLOWING BACK ABOUT 1-2 BBL/HR.
SHUT IN HAND CHOKE AND OBSERVE
PRESSURE BUILD AND STABILIZE @ 256 PSI.
PRE
- SHUT IN AND MONITOR PRESSURE,
STABILIZE AT 250 PSI.
- DISCUSS WITH WOS, TRY TO BLEED BACK 1
BBL TO OBSERVE PRESSURE RESPONSE.
BLED BACK 0.7 BBLS AND MICROMOTION
OUT READS "0".
- MONITOR WELL, FLOW SLOWLY DROPPING
FROM VERY SMALL STREAM TO TRICKLE
AND THEN TO INTERMITTENT.
CONTINUE TO MONITOR WELL.
PRE
MONITOR WELL FOR 1/2 HR, WELL IS DEAD.
- NO INDICATION OF GAS THROUGHOUT
OPERATION.
- CALL IN AND REQUEST PERMISSION TO
OPEN WELLAND MOVE FORWARD.
- REQUEST ACCEPTED AS PER GREG
SARBER AND PERMISSION GRANTED.
WEXIT
PJSM. PICKUP WHIPSTOCK BHA.
- MAKE UP INJECTOR, INJECTOR ON WELL
@ 08:10 HRS.
- TEST QTS @ 250 / 40_00 PSI, OK. OPEN EDC.
WEXIT
PJSM. RIH PUMPING @.8 BPM.
- TIE IN FROM 8930 ... MINUS 28'
CORRECTION.
WT CHECK 43K UP WT @ 9000'.
STOP AND FLOW CHECK WELL DUE TO
SIGNIFICANT DROP IN OUT DENSITY.
- OUT DENSITY DROPPED TO 8.5 PPG, NO
FLOW, WELL BORE STATIC.
- LOG CCL DOWN W/ PUMPING A BTMS UP.
OUT DENSITY CLIMBED BACK UP TO 9.48
PPG AFTER APPROXIMATELY 15 BBLS
PUMPED.
- ATTRIBUTE DENSITY DROP TO BREATHING
FLUID AND COMINGLE. NO SIGN OF GAS.
- O/A = 228, I/A = 0 PSI. DOUBLE CHECK VALVE
ALIGNMENT ON I/A. GOOD.
WEXIT
PJSM. CONFIRM AND SET WHIPSTOCK @
9280'
- CLOSE EDC AND PRESSURE UP TO 4200
PSI, OBSERVE WHIPSTOCK SET.
Printed 11/7/2016 11:10:01AM 'All depths reported in Drillers Depths`
North America - ALASKA - BP
Operation Summary Report
Page 5 of 21
Common Well Name: Z-23
AFE No
Event Type: RE-ENTER- ONSHORE
(RON)
Start Date: 10/16/2016 End Date: 10/27/2016
X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay
Site: PB Z Pad
Rig Name/No.: NORDIC 2
Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA
UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To
Hrs
Task Code NPT NPT Depth Phase
Description of Operations
(hr)
(usft)
11:45 - 12:45
1.00
STWHIP P WEXIT
PJSM. CIRCULATE A BOTTOMS UP THROUGH
MUD GAS SEPARATOR.
- PUMPING 1.5 BPM @ 1350 PSI, 9.48 PPG IN /
9.46 PPG OUT.
- UA = 0 PSI, O/A = 230 PSI. 125 BBLS PUMPED.
- MONITOR WELL, (10) MINUTES, STATIC
WELL CHECK, NO FLOW.
- NO SIGN OF ANY GAS WHILE CIRC BTMS
UP.
12:45 - 14:30
1.75
STWHIP P WEXIT
FLOW CHECKALL GOOD AFTER
CIRCULATING BOTTOMS UP. POH WITH BHA
TO SURFACE.
- FLOW CHECK WITH BHA BELOW STACK, NO
FLOW
- PULL BHA INTO BOP STACK, POP OFF WITH
INJECTOR
---INJECTOR
OFFAT 14.30
14:30 - 16:30
2.00
STWHIP P WEXIT
LAY DOWN WHIPSTOCK SETTING BHA. NO
DAMAGE TO EQUIPMENT.
LINE UP TO FLUSH MUD GAS SEPARATOR
HOLE STATIC AT SURFACE
STAB ON WITH INJECTOR, ON AT 16:30
16:30 - 19:00
2.50
STWHIP P WEXIT
PRESSURE TEST QUICK TEST SUB WHILE
MWD EQUIPMENT IS POWERED UP AND
FUNCTION TESTED.
- BREAK CIRCULATION ON WELL, IMMEDIATE
RETURNS
- RIH WITH 3.80" MILLING BHA #2 ON .6° BEND
MOTOR
19:00 - 00:00
5.00
STWHIP P WEXIT
MILL 3.80" WINDOW IN 4-1/2" CASING PER
BAKER REP FROM 9280' MD TO 9282' MD
RATE: 2.71 BPM IN, 2.71 BPM OUT
MUD WEIGHT: 9.50 PPG IN, 9.48 PPG OUT
DWOB: 1-3 KLBS
CIRC PRESSURE: 3400 PSI
AT 9284' DWOB DECREASES FROM ABOUT
1.3K TO 900#.
LOSS OF ABOUT 500 PSI MOTOR WORK.
10/20/2016 00:00 - 05:30
5.50
STWHIP P WEXIT
MILL 3.80" WINDOW IN 4-1/2" CASING PER
BAKER REP FROM 9282' MD TO 9287' MD
RATE: 2.71 BPM IN, 2.71 BPM OUT
MUD WEIGHT: 9.50 PPG IN, 9.48 PPG OUT
DWOB: 1-3 KLBS
CIRC PRESSURE: 2970 PSI
03:00 - DURING TIME MILLING AT 9286.3 FT,
BHAADVANCED IN A STICK -SLIP FASHION.
HAD TO PICK UP TO 9286 FTAND TIME DRILL
DOWN AGAIN.
- 9,285' SAMPLE SHOWS ALMOSTALL METAL,
TRACE OF CEMENT.
05:30 06:45
1.25
STWHIP P WEXIT
MILL 3.80 RATHOLE FROM 9,287' TO 9,297' AT
20 - 30 FT/MIN.
- RATE: 2.73 BPM IN, 2.75 BPM OUT
MUD WEIGHT: 9.52 PPG IN, 9.48 PPG OUT
DWOB 1.5KLBS
CIRC PRESSURE: 3,170 PSI
Printed 11/7/2016 11:10:01AM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 6 of 21
Common Well Name: Z-23 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016 X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00 OOAM Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (usft)
06:45 - 08:00 1.25 STWHIP P WEXIT CONDUCT REAM PASSES PER WELL PLAN
08:00 - 10:10 2.17 STWHIP P
10:10 - 11:25 1.25 DRILL P
11:25
14:15
2.83
DRILL P
14:15
19:00
4.75
DRILL P
19:00 - 22:00 3.00 DRILL P
Printed 11/7/2016 11:10:01AM *All depths reported in Drillers Depths'
AND UNDER GUIDANCE OF BOT REP.
PERFORM 3 REAMING PASSES AT 1'/MIN.
REAM UP AT: AS MILLED; MINOR
MOTORWORK WHEN AT +15 DEG, -15 DEG
- PASSES LOOK GOOD. NO LOSSES TO
FORMATION DURING MILLING OR REAM
PASSES.
- SAMPLE FROM 9297' ALMOST FULLY
FORMATION. CIRCULATE DOWN HI -VIS PILL
IN CONJUNCTION WITH LAST REAM PASS.
- CONDUCT DRY DRIFT AT 30 DEG LOHS (AS
MILLED), ALL GOOD
- FLOW CHECK, NO FLOW
WEXIT
POH WITH MILLING ASSEMBLY
- NO ISSUES POH. GOOD RETURN OF METAL
WITH RETURN OF HI -VIS SWEEP
'- FLOW CHECK AT SURFACE, ALL GOOD WITH
NO FLOW
- PULL BHA INTO BOP STACK, POP OFF WITH
INJECTOR
WEXIT
LAY DOWN MILLING BHA. MILLS GAUGE AT
3.80" GO, 3.79" NO-GO.
- CHANGE OUT TO BUILD BHA
- MU BUILD BHA #3 WITH 4.25" BIT ON 3.16°
BEND MOTOR AND BHI SMART TOOLS
--STAB ON WITH INJECTOR
WEXIT
PRESSURE TEST QUICK TEST SUB WHILE
TOOLS ARE BEING POWERED UP, FUNCTION
TESTED
RIH WITH BUILD BHA
LOG TIE-IN WITH -30' CORRECTION
NO ISSUES EXITING WINDOW
PROD1
DRILLAHEAD FROM 9297'. FREE SPIN OF
3030 PSI AT 2.83 BPM.
- DRILL BUILD TO 9,630' MD
- RATE: 2.60-2.85 BPM IN, 2.60-2.85 BPM OUT.
CIRC PRESSURE: 3150 - 3615 PSI
- MICROMOTION MUD WEIGHT: 9.55 PPG IN,
9.55 PPG OUT, ECD: 10.70 PPG
- ROP: 68-115 FT/HR, WOB: 1.3-4.6 KLBS
- INFREQUENT SHALE STRINGERS BUT
OTHERWISE GOOD DRILLING
PROD1
POOH. PUMP 10 BBLS LO/HI VIS SWEEPS
AROUND.
MONITOR WELL FOR 10 MINUTES WITH
DYNAMIC FLOW CHECK, GOOD.
0.52 BPM IN / 0.47 BPM OUT
MUD WEIGHT: 9.56 PPG IN, 9.59 PPG OUT
RATE: 2.80 BPM IN, 2.79 BPM OUT
OPEN EDC, POH FROM 9,280' MD TO
SURFACE.
JET WHIPSTOCK TRAY WITH OPEN EDC.
RATE: 3.5 BPM. CIRC PRESSURE: 3,000 PSI
SWEEPS RETURN ABOUT 20% EXCESS
CUTTINGS WHEN RETURNED TO SURFACE.
Printed 11/7/2016 11:10:01AM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 7 of 21
Common Well Name: Z-23 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016 X3-017YD-C: (3,155,216.00 )
Project: Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12,00 OOAM Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA UWI 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (usft)
22:00 22:50 0.83 DRILL P PROD1 MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
CLOSE EDC, POWER DOWN
INJECTOR OFF: 22:00
BIT GRADE 1-1
MAKE UP 3.0" DRILLING BHA #4
- PICK UP 2-7/8" ULS MOTOR (1.17 DEG AKO)
AND 3" COI LTRAK TOOLS
MAKE UP HYC 3.75 X 4.25 BICENTER BIT
SURFACE TESTED BHI TOOL. GOOD TEST.
PRESSURE TEST QTS TO 250 PSI LOW FOR
5 MINUTES / 3,500 PSI HIGH FOR 5 MINUTES
- INJECTOR ON: 22:50
22:50 00:00 1.17 DRILL P PROD1 RI WITH 3" DRILLING BHA #4 FROM TO 8,950'
MD
- RATE: 0.4 BPM IN, 0.4 BPM OUT. CIRC
PRESSURE: 800 PSI
MUD WEIGHT: 9.45 PPG IN, 9.55 PPG OUT
LOG DOWN FOR TIE-IN FROM 8,950' TO
9,300' MD (RA TAG) WITH -26' CORRECTION
10/21/2016 00:00 - 02:30 2.50 DRILL P PROD1 CONTINUE RUN BACK TO BOTTOM WITH BHA
#4
LOG DOWN FOR TIE-IN FROM 8,950' TO
9,300' MD (RA TAG) WITH -26' CORRECTION
02:30 - 05:00 2.50 DRILL P PROD1 DRILL 4.25" LATERAL FROM 9,630' MD TO
9,750' MD
FREE SPIN: 3,200 PSI, 2.85 BPM
RATE: 2.84 BPM IN, 2.82 BPM OUT. CIRC
PRESSURE: 3,200 - 3,500 PSI
- MUD WEIGHT: 9.54 PPG IN, 9.53 PPG OUT,
ECD: 10.65 PPG
ROP: 100 FT/HR, WOB: 0.9 - 2.0 KLBS
AT 9,750' PUMP 10 BBLS LO/HI VIS SWEEPS
AROUND
05:00 - 09:30 4.50 DRILL P PROD1 DRILL 4.25" LATERAL FROM 9,750' MD TO
10,050' MD
FREE SPIN: 3,400 PSI, 3.08 BPM
RATE: 2.89-3.08 BPM IN, 2.86-3.07 BPM OUT.
CIRC PRESSURE: 3,400 - 3,800 PSI
- MUD WEIGHT: 9.56 PPG IN, 9.59 PPG OUT,
ECD: 10.78 PPG. MW SLOWLY BUILT TO 9.62
PPG WITH DRILLING AND LONG WIPER.
ROP : 78-104 FT/HR, WOB: 0.9 - 3.0 KLBS
09:30 10:30 1.00 DRILL P PROD1 PERFORM WIPER TRIP FROM 10,050' MD TO
9300' MD
- RATE: 2.80 BPM IN, CIRC PRESSURE: 3350
PSI
- PUMPED 10 BBL LO -VIS / 10 BBL HI -VIS
COMBO SWEEP AT BOTTOM BEFORE TRIP.
- TRIP UP AND DOWN SMOOTH WITH NO
INDICATIONS OF HOLE TROUBLE
- LOG DOWN FOR TIE-IN WITH +7.5'
CORRECTION
CONTINUE TRIP BACK DOWN TO BOTTOM
Printed 11/7/2016 11:10:01AM `All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name: Z-23 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016 X3-017YD-C: (3,155,216.00 )
Page 8 of 21
Project: Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA
UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth
Phase Description of Operations
(hr) (usft)
10:30 - 18:00 7.50 DRILL P
PROD1 DRILL LATERAL FROM 10,050' MD TO 10,445'
MD
FREE SPIN: 3500 PSI, 2.89 BPM
RATE: 2.89-3.0 BPM IN, 2.74-2.93 BPM OUT.
CIRC PRESSURE: 3640-3740 PSI
- MICROMOTION MUD WEIGHT: 9.63 PPG IN,
9.64 PPG OUT, ECD: 10.80 PPG
- ROP: AVERAGING 80 FT/HR, WOB: 1.5 — 2.7
KLBS
- CONDUCTING SHORT PICKUPS
FREQUENTLY TO TRANSFER WEIGHT TO BIT,
PREVENT DRILL -OFF. PICKUPS CONSISTENT
BUT GETTING STICKY WITH A COUPLE OF
8-10K OVERPULLS ON THE PICKUP TO
BREAKOVER.
- SWAP TO NEW MUD SYSTEM, PRESSURES
DROPPED BY 300 PSI, PUW REMAINED THE
SAME AT 42-44K, AND SOW INITIALLY
IMPROVED FROM AVERAGING -14K UP TO 4K
BUT THEN FELL BACK OF TO -12 TO -16K
(HAVING TO PUSH DOWN WITH INJECTOR TO
GET COIL TRANSFER).
18:00 21:20 3.33 DRILL P
PROD1 PERFORM LONG WIPER TRIP UP ABOVE
WINDOW FROM 10,445' MD TO 8,900' MD
- RATE: 2.86 BPM IN, 2.71 BPM OUT. CIRC
PRESSURE: 3,200 PSI
ABOVE WINDOW, OPEN EDC PUMP 4.3 BPM
! 4,000 PSI FOR 2 B/U.
PUMP 10 BBLS LO / HI VIS SWEEPS
AROUND, RETURN ABOUT 10% EXCESS
CUTTINGS
CLEAN PASS UP
LOG DOWN FOR TIE-IN FROM 9,30070 RA
TAG WITH +10.5' CORRECTION
CLOSE EDC, RIH TO BOTTOM
USE REDUCED RATE AND KEEP A GOOD TF
TO BOTTOM
- BLED IA FROM 1,100 PSI TO 100 PSI.
21:20 00:00 2.67 DRILL P
PROD1 DRILL 4.25" LATERAL FROM 10,445' MD TO
10,540' MD
FREE SPIN: 3,000 PSI, 2.76 BPM
RATE: 2.76 BPM IN, 2.75 BPM OUT. CIRC
PRESSURE: 3,000 - 3,300 PSI
- MUD WEIGHT: 9.55 PPG IN, 9.55 PPG OUT,
ECD: 10.79 PPG
ROP: 80 FT/H R, WOB: 2 -4KLBS
DRILLING WITH POSITIVE STRING WEIGHT
AFTER THE WIPER, HOWEVER ONLY LASTS
ABOUT 40 FT.
DISCUSS WITH ODE, INCREASE LUBE NXS
BY 0.5%, BRINGING IT TO 2.5%. EZ -GLIDE AT
2%.
Printed 11/7/2016 11:10:01AM *All depths reported in Drillers Depths*
North America - ALASKA - BP Page 9 of 21
Operation Summary Report
Common Well Name: Z-23 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016 X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) - - (usft)
10/22/2016 100:00 - 02:30 2.50 DRILL P PROD1 DRILL 4.25" LATERAL FROM 10,540' MD TO
02:30 - 05:30 3.00 DRILL P
0530 - 13:15 7.75 DRILL P
13:15 14:15 1.00 DRILL P
10,615' MD
FREE SPIN: 3,650 PSI, 3.06 BPM
RATE: 3.06 BPM IN, 3.05 BPM OUT. CIRC
PRESSURE: 3,650 - 3,800 PSI
MUD WEIGHT: 9.61 PPG IN, 9.61 PPG OUT,
ECD: 10.79 PPG
ROP: 0 - 80 FT/HR, WOB: 0 - 2KLBS
DIFFICULT SLIDING, HARD TO TURN
AROUND ON WIPER TRIP.
PUMP 10 BBLS LO / HI VIS SWEEPS AROUND
PULL FREQUENT 200 FT WIPER TRIPS.
AT 10,615 FT UNABLE TO GET WEIGHT ON
BIT.
PROD1 PERFORM LONG WIPER TRIP TO WINDOW
FROM 10,615" MD
- RATE: 3.04 BPM IN, 2.84 BPM OUT. CIRC
'PRESSURE: 3,500 PSI.
ABOVE WINDOW, PUMP 1.5X B/U AT 4.26
BPM / 4,050 PSI. FAIR AMOUNT OF CUTTINGS
COMING BACK.
TIE IN DEPTH, CORRECT+10.5'.
CLOSE EDC, RUN BACK TO BOTTOM. PUMP
REDUCED RATE THROUGH SHALES, KEEP AS
— DRILLED TOOLFACE.
PROD1 DRILL 4.25" LATERAL FROM 10,615' MD TO
10,864' MD
FREE SPIN: 3,400 PSI, 2.97 BPM
RATE: 2.97 BPM IN, 2.97 BPM OUT. CIRC
PRESSURE: 3,400 - 3,800 PSI
- MUD WEIGHT: 9.55 PPG IN, 9.56 PPG OUT,
ECD: 10.75 PPG
ROP: 0 - 50 FT/HR, WOB: 0 - 4KLBS
SIGNIFICANT DIFFICULTY IN SLIDING.
ENCOUNTERING STICK -SLIP WHILE ON
BOTTOM TO DRILL. ABLE TO APPLY WOB
FOR SHORT DURATIONS BUT HAVE TO PICK
UP EACH TIME IT DRILLS OFF.
- VARY FLOW RATE FROM 2.65 BPM TO 3.01
BPM IN ATTEMPT TO CHANGE SOMETHING
FOR DRILLING RESULTS, ONLY REAL HELP IS
FREQUENT 200' TO 300' WIPERS.
- NXS LUBRICANT RATIO HAD BEEN BUILT BY
.25% DURING NIGHT WITH NO REAL RESULT.
DEVELOP PLAN TO INCREASE LSRV
INCREMENTALLY TO -50K IN HOPE TO HELP
MOVE CUTTINGS AND TO SLOWLY INCREASE
NXS LUBRICANT PERCENTAGE.
- CONTINUE TO DRILL UTILIZING FREQUENT
PICKUPS DUE TO STICK -SLIP BUT ABLE TO
APPLY WOB AND DRILL -OFF PRINCIPLE
FAIRLY EFFECTIVELY.
PROD1 CONDUCT WIPER UP TO WINDOW IN
PREPARATION FOR EP LUBE PILL
- PULL TO WINDOW, HOLE SEEMS TO BE
FAIRLY CLEAN
- PUW -45K ON TRIP UP
Printed 11/7/2016 11:10.01AM "All depths reported in Drillers Depths*
North America - ALASKA - BP
Operation Summary Report
Page 10 of 21
Common Well Name: Z-23 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016 X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (usft)
14:15 17:15 3.00 DRILL P PROD1 OPEN EDC, JET ACROSS WHIPSTOCK TRAY.
CIRC DOWN 10 BBL LO -VIS PILL.
- CHASE PILL OUT AT 4.1 BPM, 4000 PSI.
INCREASE OF 20% IN CUTTINGS JUST AHEAD
OF PILL, SEEING LARGER SIZED CUTTINGS
ALSO. RETURN WAS STEADY STREAM OF
INCREASED CUTTINGS.
- PUMP DOWN 15 BBL LO -VIS, 30 BBL EP MUD
LUBE, 15 BBL LO -VIS AND 15 BBL HI -VIS PILL
PER OCN. CIRCULATE IT OUT OF HOLE
SLOWLY IN ATTEMPT FOR EP LUBE TO
REACT WITH TUBING.
- CIRCULATE PILL OUTAND DUMP AT
SURFACE
-CLOSE EDC
17:15 - 18:30 1.25 DRILL P PROD1 RIH AT 30 FPM, CIRCULATING AT MIN RATE OF
.55 BPM, 1205 PSI.
SLACK OFF WEIGHTAT THIS RUNNING
SPEED 20-22K; SLACK OFF WEIGHT AT 35
FPM OF 18-20K
_ - MW IN 9.55 PPG, MW OUT 9.58 PPG
18:30 00:00 5.50 DRILL P PROD1 'DRILL 4.25" LATERAL FROM 10,865' MD TO
11,000' MD
FREE SPIN: 3,790 PSI, 3.00 BPM
RATE: 3.00 BPM IN, 3.00 BPM OUT. CIRC
PRESSURE: 3,780 - 3,900 PSI
MUD WEIGHT: 9.63 PPG IN, 9.56 PPG OUT,
ECD: 10.93 PPG
ROP: 0 - 50 FT/HR, WOB: 0 - 4KLBS
SIGNIFICANT DIFFICULTY IN SLIDING.
ENCOUNTERING STICK -SLIP WHILE ON
BOTTOM TO DRILL. ABLE TO APPLY WOB
FOR DRILLING 10 - 20 FT THEN HAVE TO PICK
UP FOR 200 FT WIPER.
- AROUND 22:00 SEE SOME RUBBER PIECES
COME ACROSS SHAKER. MOTOR STILL
APPEARS TO BE WORKING, WHEN THE CT IS
ABLE TO SLIDE.
- PUMP 10 BBLS LO / HI VIS SWEEPS AROUND
10,950'. NO INCREASE IN CUTTINGS WHEN
THEY RETURN.
DISCUSS WITH MUD ENGINEER, ADD
ANOTHER 0.25% NXS LUBE SLOWLY TO THE
MUD SYSTEM.
Printed 11/7/2016 11:10:01AM *All depths reported in Drillers Depths*
North America - ALASKA - BP
Page 11 of 21
Operation Summary Report
Common Well Name: Z-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016
X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA
UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase
Description of Operations
(hr) - (usft)
10/23/2016 00:00 01:00 1.00 DRILL P PROD1
DRILL 4.25" LATERAL FROM 11,000' MD TO
11,021' MD
FREE SPIN: 3,790 PSI, 3.00 BPM
RATE: 3.00 BPM IN, 3.00 BPM OUT. CIRC
PRESSURE: 3,780 - 3,900 PSI
- MUD WEIGHT: 9.64 PPG IN, 9.59 PPG OUT,
ECD: 10.93 PPG
- ROP: 0 - 50 FT/HR, WOB: 0 - 4KLBS
-VERY DIFFICULT TO SLIDE. NEED TO PICK
UP EVERY 10 - 20' DRILLED AND PULL 300 FT
WIPER.
-PUMP 10 BBLS LO/Hl VIS SWEEPS AROUND
11,000'. NO INCREASE IN CUTTINGS WHEN
THEY RETURN.
- DURING LAST WIPER, CAN'T GET BACK
DOWN PAST 10,975' BASE OF 45N SHALE.
TRY VARIOUS RUNNING SPEEDS AND PUMP
RATES, STACKING WEIGHT NOT AT THE
DWOB BUT SOMEWHERE BEHIND THE BHA.
01:00 02:00 1.00 DRILL P PROD1
PERFORM LONG WIPER TRIP TO WINDOW
FROM 11,021' MD
RATE: 3.00 BPM IN, 2.84 BPM OUT. CIRC
PRESSURE: 4,100 PSI.
DURING WIPER, SEE CIRC PRESSURE
SPIKE. LIKELY CAUSED BY MOTOR RUBBER,
STILL GETTING A SMALL AMOUNT OF
RUBBER PIECES COMING BACK.
DISCUSS WITH DD, DECIDE TO TRIP ALL
THE WAY OUT AND REPLACE MOTOR.
ABOVE WINDOW, OPEN EDC PUMP 3.97
BPM / 4,050 PSI. FAIR AMOUNT OF CUTTINGS
COMING BACK.
PLUGGING OUT MM OCCASIONALLY.
02:00 04:00 2.00 DRILL N DFAL 11,021.00 PROD1
POOH FOR FAILED MOTOR.
- CONTINUE PUMPING 3.97 BPM / 4,020 PSI
ALL THE WAY OUT.
04:00 - 05:00 1.00 DRILL N DFAL 11,021.00 PROD1
MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
CLOSE EDC, POWER DOWN
INJECTOR OFF: 04:00
BIT IS 1-1 WITH 2 PLUGGED JETS, RUBBER
FROM MOTOR.
MAKE UP 3.0" DRILLING BHA#5
PICK UP 2-7/8" ULS MOTOR (1.2 DEG AKO)
AND 3" COI LTRAK TOOLS
MAKE UP3.75 X 4.25 HCC BICENTER BIT
SURFACE TESTED BHI TOOL. GOOD TEST.
PRESSURE TEST QTS TO 250 PSI LOW FOR
5 MINUTES / 3,90OPSI HIGH FOR 5 MINUTES,
GOOD TEST
INJECTOR ON 05:00
05:00 07:00 2.00 DRILL N DFAL 11,021 00 PROD1
RIH WITH 4.25" DRILLING BHA #5
RATE: 2.0 BPM IN, CIRC PRESSURE 1960 PSI
MUD WEIGHT: 9.58 PPG IN, 9.58 PPG OUT
LOG DOWN FOR TIE-IN WITH -29.5'
CORRECTION
- PUW IN CASED HOLE 36 KLBS, SOW 20
KLBS AT 8600' MD AFTER LOGGING
Printed 1117/2016 11:10:01AM *All depths reported in Drillers Depths*
North America - ALASKA - BP
Operation Summary Report
Page 12 of 21
Common Well Name: Z-23 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016 X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (usft)
07:00 - 08:00 1.00 DRILL P PROD1 NO ISSUES EXITING WINDOW ENTER INTO
08:00 - 09:30 1.50 DRILL P
09:30 - 13:30 4.00 DRILL N SFAL
13:30 15:30 2.00 DRILL P
OPEN HOLE, INITIAL SOW INCREASED TO
22K.
- RIH AT MIN RATE OF .5 BPM, 1115 PSI.
SEEING SLIGHT BOBBLES ON TRIP IN. LOSS
OF WEIGHT AT 10,000' CORRESPONDS TO
SMALL STRINGER ON LOG.
NO ISSUES RUNNING PAST 10,300' OR ON
REST OF TRIP TO BOTTOM
PROD1 DRILL 4.25" LATERAL FROM 11,021' MD TO
11,071' MD
FREE SPIN: 3,790 PSI, 2.85 BPM
RATE: 3.00 BPM IN, 3.00 BPM OUT. CIRC
PRESSURE: 3,780 - 3,900 PSI
- MUD WEIGHT: 9.64 PPG IN, 9.59 PPG OUT,
ECD: 10.93 PPG
ROP: 0 - 50 FT/HR, WOB: 0 - 4KLBS
VERY DIFFICULT TO SLIDE. NEED TO PICK
UP EVERY 10 - 20' DRILLED AND PULL 300 FT
WIPER.
- OBSERVING PRETTY STEADY RUN OF
CUTTINGS RETURNS
MICROMOTION IN AND OUT ARE BEING
PLUGGED OFF CONSISTENTLY. WORK TO
CLEAR, UNABLE TO MAINTAIN CONSISTENCY
IN READINGS.
11,071.00 PROD1 PULL TO WINDOW TO GET TO SAFE SPOT TO
WORK ON BLOWDOWN.
- POH AT 1.45 BPM, 1600 PSI. PUW OF 43K.
TRIP UP WAS CLEAN
- PARKAT WINDOWAND BLOWDOWN
MICROMOTION. STILL HAVING
BACKPRESSURE AT WELLHEAD.
BLOWDOWN BY-PASS LINES, SIGNIFICANT
AMOUNTS OF PEA -SIZE TO QUARTER -SIZE
SILTSTONE (SOMEANGULAR AND SOME
ROUNDED) AND METAL DEBRIS (FROM THE
WINDOW) THAT HAD ACCUMULATED FROM
BLOWING DOWN THE MICROMOTION.
- OPEN EDC AND CIRCULATE BOTTOMS UP
WITH LO -VIS / HI -VIS PILL COMBO, NO REAL
CHANGE IN VOLUME OF CUTTINGS ACROSS
PROD1 BACK ON BOTTOM AT 11,071'. FREE SPIN OF
3545 PSI AT 2.90 BPM.
- MAKE MANY ATTEMPTS TO DRILL AHEAD
WHILE VARYING PUMP RATES, RUNNING
SPEED TO TAG BOTTOM IN ATTEMPT TO
ENGAGE BIT. CONDUCT MANY SHORT
PICKUPS (ALL CLEAN) BUT CANNOT GET ANY
MOTORWORK.
- PUMP DOWN PILL COMBO AND USE FAST
RUNNING SPEED TO FLUSH BOTTOM, NO GO.
- DISCUSS ALTERNATIVES WITH ODE,
DECIDE ON PULLING FOR AGITATOR
- MW IN 9.62 PPG, MW OUT 9.61 PPG, ECD
HAD RISEN FROM 10.71 PPG TO 11.01
THROUGHOUT TODAYS DRILLING ATTEMPTS
Printed 11/7/2016 11:10:01AM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: Z-23 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016 X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Page 13 of 21
Date From - To Hrs
Task Code NPT NPT Depth
Phase Description of Operations
(hr)
(usft)
15:30 19:30 4.00
DRILL N DPRB 11,081.00
PROD1 POH FOR TRIP TO SURFACE TO CHANGE
OUT BHA. FLOW CHECK OFF BOTTOM,
SLIGHT LOSSES TO FORMATION.
- POH AT 3.0 BPM, 3560 PSI, SLOWING RATE
THROUGH SHALE INTERVALS OF CONCERN
- TRIP UP CLEAN, NO OVERPULLS. LOST 40
BBLS TO FORMATION WHEN PUMPING HARD
ON TRIP UP.
- PULL INTO WINDOW, OPEN EDC TIMING
LO-VISAND HI -VIS COMBO ACROSS WINDOW
AND WHIPSTOCK. BEGIN TRIP UP HOLEAT
MAX RATE.
LOSING -23 BPH WHILE PULLING UP HOLE
AT 4.08 BPM, 4000 PSI.
19:30 20:30 1.00
DRILL N DPRB 11,081.00
PROD1 MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
CLOSE EDC, POWER DOWN
INJECTOR OFF: 19:40
BIT IS 1-1 WILL RE -RUN.
FILL WELL WITH 3.5 BBLS.
20:30 - 23:30 3.00 DRILL N DPRB 11 081.00 PROD1 REMOVE BHI CABLE HEAD
23:30 00:00 0.50 BOPSUR
10/24/2016 00:00 00:30 0.50 BOPSUR
00:30 - 03:30 3.00 DRILL
RIG UP HYDRAULIC CT CUTTER, CUT 100 FT
OF CT OFF FOR CHROME MANAGEMENT.
INSTALL SLB CT CONNECTOR AND PULL
TEST, GOOD.
INSTALL CABLE HEAD, PRESSURE TEST 300
PSI FOR 5 MIN, 3,900 PSI FOR 5 MIN, GOOD.
WHILE MAKING UP CABLE HEAD, PUMP 5.5
BPM ACROSS TREE AND THROUGH OUT MM
TO CLEAR ITAND THE BYPASS OF ANY
REMAINING CUTTINGS.
N DPRB 11,081.00 PROD1 FUNCTION TEST BOPS FROM DRILLERS
- PANEL.
N DPRB PROD1 MAKE UP 3.0" DRILLING BHA #6
- PICK UP 2-7/8" ULS MOTOR (1.2 DEG AKO)
AND 3" COILTRAK TOOLS
- MAKE UP 3.75 X 4.25 HCC BICENTER BIT,
RE -RUN
- SURFACE TESTED BHI TOOLAND AGITATOR,
GOOD TEST.
- PRESSURE TEST QTS TO 250 PSI LOW FOR
5 MINUTES / 3,900PSI HIGH FOR 5 MINUTES,
GOOD TEST
INJECTOR ON 00:30
N DPRB PROD1 RIH WITH 3.0" DRILLING BHA#6 FROM
SURFACE TO 9,320' MD
RATE: 2.1 BPM IN, 2.6 BPM OUT
MUD WEIGHT: 9.57 PPG IN, 9.60 PPG OUT
LOG DOWN FOR TIE-IN FROM 9,320' TO LOG
RA TAG. WITH -30' CORRECTION
PERIODIC PLUGGING OUT MM WHILE RIH.
Printed 11/7/2016 11:10:01AM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 14 of 21
Common Well Name: Z-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 10/16/2016
End Date: 10/27/2016
X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay
Site: PB Z Pad
Rig Name/No.: NORDIC 2
Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA
UWI:500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
NPT Depth Phase
Description of Operations
(hr)
(usft)
03:30 - 06:30 3.00
DRILL P
PROD1
DRILL 4.25" LATERAL FROM 11,083" MD TO
11,218" MD
- FREE SPIN: 3,570 PSI, 2.71 BPM
- RATE: 2.72 BPM IN, 2.62 BPM OUT. CIRC
PRESSURE: 3,570 - 4,000 PSI
- MUD WEIGHT: 9.58 PPG IN, 9.67 PPG OUT,
ECD: 11.04 PPG
ROP: 60 - 120 FT/HR, WOB: 1-3 KLBS
START NEW MUD DOWN THE CT AS PART
OF DUMP AND DILUTE.
- AT 11,160 FT PULL 200 FT WIPER TRIP,
STACKING WT (NOTAT BIT) GOING BACK
THROUGH 45N SHALE.
ATTEMPT PICKUP OFF BOTTOM, STUCK
06:30 06:45 0.25
DRILL N DPRB
11,218.00 PROD1
FULL RETURNS, CANNOT WORK UP OR
DOWN, CAN ORIENT. DIFFERENTIALLY
STUCK.
- WORK PIPE PER WELL PLAN. CIRCULATE
AND THEN DOWN ON PUMPS TO ALLOW TO
REST. PICK UP, FREE.
- CONDUCT SHORT WIPER, ALL SEEMS
GOOD.
06:45 07:30 0.75 DRILL P PROD1 DRILL 4.25" LATERAL FROM 11,218" MD TO
11,236" MD
- FREE SPIN: 3,570 PSI, 2.71 BPM
- RATE: 2.73 BPM IN, 2.67 BPM OUT. CIRC
PRESSURE: 3,620 - 3,880 PSI
- MUD WEIGHT: 9.63 PPG IN, 9.56 PPG OUT,
ECD: 10.8 PPG
- ROP ERRATIC DUE TO PICKUPS, WOB:
1.0-2.9 KLBS
- PICK UP TO BLOW DOWN MICROMOTION,
STUCK
07:30 10:45 3.25 DRILL N DPRB 11,236.00 PROD1 ATTEMPT TO WORK PIPE WHILE CREW
BLOWS DOWN MICROMOTION. NO SUCCESS
IN GETTING FREE. FULL RETURNS, ABLE TO
ORIENT.
- FOLLOW WELL PLAN FOR STICKING
MECHANISM
- CIRCULATE AROUND, ALLOW TO RELAX.
NO GO ON GETTING FREE.
- LINE-UP FOR MINERAL OIL. FOLLOW PLAN
FOR PUMPING SPACERS AND MINERAL OIL.
- CIRCULATE DOWN AND ALLOW TO SOAK.
PICK UP, FREE AT 48K PICK UP WEIGHT (-6K
OVER)
- IMMEDIATELY WORK PIPE UP AND THEN
DOWN TO CIRCULATE SPACERS AND
MINERAL OIL OUT
- LINE UP CREW FOR TRIP TO WINDOW PER
DIRECTION FROM ODE FOR CIRCULATION
STRATEGY
10:45 12:15 1.50 DRILL N DPRB 11,236.00 PROD1 PULL UP HOLE TO WINDOW
PICK UP AND TRIP UP VERY CLEAN.
CIRCULATE AT 3.5 BPM, 3320 PSI ON INITIAL
TRIP UP. LOWER RATE BEFORE
APPROACHING FAULT AT 10,080'.
- NO ISSUES UP AND INTO WINDOW.
Printed 11/7/2016 11:10:01AM *All depths reported in Drillers Depths*
North America - ALASKA - BP
Operation Summary Report
Common Well Name: Z-23
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016
Project: Prudhoe BaySi Pte B Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Contractor: NORDIC CALISTA
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task
_ (hr)
12:15 - 14:00 1.75 1 DRILL
14:00 - 15:00 1.00 DRILL
1500 - 1800 3.00
Page 15 of 21
AFE No
X3-017YD-C: (3,155,216.00)
Rig Release: 10/30/2016
UWI: 500292195000
Code NPT NPT Depth
Phase Description of Operations
(usft)
_
N DPRB 11,236.00
PROD1
OPEN EDC, JET ACROSS WHIPSTOCK TRAY
SEVERAL TIMES. CIRCULATE DOWN 15 BBL
100K LSRV PILL.
- POSITION EDC AT WINDOW AS PILL EXITS
- CIRCULATE PILL OUT OF WELL WHILE
PICKING UP BHA SLOWLY TO CHASE IT OUT.
CHASE ALL THE WAY OUT OF WELL.
MICROMOTION PLUGGED OFF 4 TIMES,
NEEDED TO BE BLOWN DOWN. CUTTINGS
RETURNS REALLY DID NOT INCREASE WITH
SWEEP RETURN.
ONCE HI -VIS PILL WAS AT SURFACE AND
DISPOSED OF, RAN BHA BACK DOWN AT
HIGH RUNNING RATE. CIRCULATED
ANOTHER BOTTTOMS UP IN SAME MANNER,
PLUGGED OFF MICROMOTION 1 MORE TIME
BUT NOTHING MORE REMARKABLE OVER
SHAKER. CONTINUE PULLING UP WITHOUT
ISSUES AT MICROMOTION OR AT SHAKER.
N DPRB 11,236.00
PROD1 TURNAROUND, LOG TIE-IN MOVING DOWN
WITH +11' CORRECTION. CLOSE EDC, EXIT
WINDOW AND RIH WITH NO ISSUES. RIH AT
MIN RATE OF .55 BPM, 1135 PSI. CLEAN TRIP
ALL THE WAY DOWN.
P
PROD1 DRILL 4.25" LATERAL FROM 11,236' MD TO
11,390' MD
- FREE SPIN: 3,800 PSI, 2.73 BPM
RATE: 2.72-2.77 BPM IN, 2.62-2.75 BPM OUT.
CIRC PRESSURE: 3,870 - 4,210 PSI
MUD WEIGHT: 9.62 PPG IN, 9.59 PPG OUT,
ECD: 10.96 PPG
ROP: 25 - 80 FT/HR, WOB: 2.45-4.0 KLBS
18:00 20:10 2.17 DRILL P PROD1 DRILL 4.25" LATERAL FROM 11,236' MD TO
11,418' MD
FREE SPIN: 3,800 PSI, 2.73 BPM
RATE: 2.72-2.77 BPM IN, 2.62-2.75 BPM OUT.
CIRC PRESSURE: 3,870-4,210 PSI
MUD WEIGHT: 9.62 PPG IN, 9.59 PPG OUT,
ECD: 10.96 PPG
ROP: 25 - 80 FT/HR, WOB: 2.45-4.0 KLBS
PUMP 10 BBLS LO/HI VIS SWEEPS AROUND.
NO INCREASE IN CUTTINGS WHEN SWEEP
RETURNS.
CONDUCT NUMEROUS SHORT WIPERS
WHEN MOTOR WORK DRILLS OFF,
DURING WIPER FROM 11,418' CAN'T GET
BACK TO BOTTOM, STACKING WEIGHT
SOMEWHERE BEHIND THE BHA.
20:10 22:30 T 2.33 DRILL P PROD1 PERFORM LONG WIPER TRIP TO WINDOW
FROM 11,418' MD TO 8,900' MD
RATE: 2.80 BPM IN, 2.44 BPM OUT. CIRC
PRESSURE: 3,940 PSI
PUMP 10 BBLS LO/HI VIS SWEEPS AFTER
PULLING THROUGH THE WINDOW, DUMP
THE LO -VIS AT SURFACE.
SLIGHT INCREASE IN CUTTINGS AT HI -VIS
RETURN, WITH SOME LARGER SIZED
ROCKS.
CLEAN PASS UP THROUG OPEN HOLE.
Printed 11/7/2016 11:10:01AM 'All depths reported in Drillers Depths*
North America - ALASKA - BP Page 16 of 21
Operation Summary Report
Common Well Name: Z-23 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016 X3-017YD-C: (3,155,21&00)
Project: Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (usft)
22:30 - 22:50 0.33 DRILL P PROD1 WHILE PUMPING B/U CONDUCT H2S RIG
2250 - 00:00 1.17 DRILL P
10/25/2016 00:00 - 00:30 0.50 DRILL P
00:30 - 03:30 3.00
03:30 - 05:15 1.75
DRILL P
DRILL P
05:15 - 07:15 2.00 DRILL P
Printed 1117/2016 11:10:01AM *All depths reported in Drillers Depths"
EVAC EXERCISE WITH ELLINGTON CREW.
ALL CREW + 1 CH2 DRIVER MUSTER IN
PRIMARY MUSTER AREA (UPWIND) AND ARE
ACCOUNTED FOR IN 2 MIN.
CONDUCTAAR FOLLOWING THE DRILL.
PROD1
CONTINUE PUMPING WITH OPEN EDC UNTIL
RETURNS CLEAN UP, ABOUT 3X B/U.
TIE-IN DEPTH AT RA FROM 9,300', CORRECT
+10'.
RIH TO BOTTOM.
PROD1
CONTINUE WIPER TO BOTTOM.
DIFFICULT TO PASS 10,950' SHALE. STACK
WT HERE SEVERAL TIMES WITH REDUCED
PUMP RATE, AS DRILLED TF.
GO TO 1 BPM, AS DRILLED TF, EASE PAST AT
1 FT/MIN STOPPING ATANY MOTOR WORK.
FINALLY ABLE TO PASS, CONTINUE TO
BOTTOM.
PROD1
DRILL 4.25" LATERAL FROM 11,418' MD TO
11,525' MD
- FREE SPIN: 3,750 PSI, 2.82 BPM
- RATE: 2.82 BPM IN, 2.77 BPM OUT. CIRC
PRESSURE: 3,750 - 4,100 PSI
- MUD WEIGHT: 9.62 PPG IN (NEW MUD), 9.52
PPG OUT, ECD: 11.1 PPG
- ROPAROUND 100 FT/HR AFTER BREAKING
THROUGH 120' SHALE AT 11,420'
- PUMP 10 BBLS LO/HI VIS SWEEPS AROUND,
DUMP THE LO -VIS AT SURFACE.
PROD1
PICKUP FROM 11,525' IS 80K, DIFFERENTIAL
STICKING.
PULL 300' WIPER.
DIFFICULT TO GET BACK TO BOTTOM, NOT
SLIDING WELL.
CONTINUE DRILLING FROM 11,525'.
FREE SPIN: 3,900 PSI, 2.78 BPM
RATE: 2.77 BPM IN, 2.77 BPM OUT. CIRC
PRESSURE: 3,900 - 4,200 PSI
- MUD WEIGHT FROM MM READINGS: 9.68
PPG IN, 9.53 PPG OUT, ECD: 11.03 PPG
NOTE: MUD ENGINEER MEASURED MUD
WEIGHT WITH PRESSURIZED BALANCE,
FOUND 9.5 PPG IN / OUT. IN MM READING
HIGH.
ROP IS ERRATIC, STICK SLIP DRILLING.
PUMP 10 BBLS LO/HI VIS SWEEPS AROUND,
DUMP THE LO -VIS AT SURFACE.
DRILL TO 11,562'.
PROD1
PERFORM WIPER TRIP FROM 11,562' MD TO
11,000' MD
- RATE: 2.77 BPM IN, 2.55 BPM OUT. CIRC
PRESSURE: 4,090 PSI
- RUN BACK DOWN FROM 11,000' AT 1 BPM
WITH NO ISSUES BY 10,900' INTERVAL.
BRING PUMP RATE UP TO 2.6 BPM AS BHA
APPROACHES AREA OF CONCERN AT 11,300'.
PRETTY RATTY HOLE CONDITIONS FROM
11,060-11,150' AND THEN AGAIN FROM
11,310-11,440'.
- TAG BOTTOM AT UNCORRECTED DEPTH OF
11,556'.
Printed 1117/2016 11:10:01AM *All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 17 of 21
Common Well Name: Z-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016
X3-017YD-C: (3,155,216.00 )
Project. Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA
UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase
Description of Operations
(hr) (usft)
07:15 13:30 6.25 DRILL P PROD1
DRILL 4.25" LATERAL FROM 11,556' MD TO
11,723' MD
FREE SPIN: 3860 PSI, 2.65 BPM
RATE: 2.65-2.82 BPM IN, 2.58-2.77 BPM OUT.
CIRC PRESSURE: 4,045 - 4,320 PSI
- MUD WEIGHT: 9.62 PPG IN (NEW MUD), 9.52
PPG OUT, ECD: 11.1 PPG
ROP ERRATIC AT 25-65 FT/HR
WELL WENT ON LARGE LOSSES FOR
SHORT TIME AT 11,630' (LOG SHOWS FAULT).
FLUIDS WERE ALREADY BUILT AT PLANT,
MOBILIZED TRUCK TO GET OUT TO
LOCATION.
LOSSES SLOWED BUTAVERAGING -15 BPH
PICK UP OFF BOTTOM, CLEAN PICK UP
INITIALLY BUT THEN UNABLE TO MOVE.
ABLE TO ORIENT AND FULL RETURNS,
DIFFERENTIALLY STUCKAT 11,117'.
13:30 16:15 2.75 DRILL N STUC 11,723.00 PROD1
WORK PIPE PER WELL PLAN, CBU AND THEN
RELAX.
CIRCULATE DOWN NEW MUD AROUND COIL
INTO OPEN HOLE, LOSSES DURING
CIRCULATION AVERAGING 12-15 BPH.
'ALLOW TO RELAX AND RE -ATTEMPT TO
WORK PIPE FREE. CANNOT GET FREE.
- MINERAL IN PLACE, CONTINUE TO
CIRCULATE WHILE KCL SPACER PILL IS
BUILT. LOSSES AT THIS TIME -8-10 BPH.
MINERAL OIL WITH KCL SPACERS WORKED,
FREE AFTER SOAKING -2 MINUTES WHILE IN
TENSION.
- MOVE PIPE, DRILLAHEAD TO 11,735' WHILE
CIRCULATING MINERAL OIL UP TO WINDOW
16:15 19:00 2.75 DRILL P PROD1
PLANNED WIPER TRIP TO WINDOW. INITIAL
RATE OF 2.85 BPM, 3815 PSI.
- DROP RATE TO 1 BPM THROUGH SHALE
INTERVAL OF 11,440' UP TO 11,300'
- BRING RATE BACK UP ONCE PAST,
CONTINUE UP AT 2.82 BPM, 3600 PSI
MW IN 9.68 PPG (READING HEAVY IN
COMPARISON TO MUD CHECKS WITH
DENSITY SCALE), MW OUT 9.52 PPG (WILL
CALIBRATE MICROMOTION ON NEXT TRIP TO
SURFACE), ECD OF 11.17 PPG
- PULL INTO WINDOWAND OPEN EDC WITH
HI -VIS PILLAT BIT. CIRCULATE HI -VIS PILL UP
WHILE PICKING UP HOLE. MICROMOTION
HAD BUILD UP TO CAUSE BACK PRESSURE
SEVERAL TIMES.
- WITH HI -VIS PILLAT SURFACE, TURN
AROUND AND GO TO WINDOWAGAIN.
CIRCULATE ANOTHER 1-1/2 TIMES BOTTOMS
UP WHILE PICKING UP. BACKFLUSH
MICROMOTION SEVERAL TIMES TO CLEAR.
SHAKER AND MICROMOTION CLEAR.
- CLOSE EDC WHILE MOVING BACK DOWN
TOWARDS WINDOW
Printed 11/7/2016 11:10:01AM *All depths reported in Drillers Depths*
North America - ALASKA - BP
Operation Summary Report
Page 18 of 21
Common Well Name: Z-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 10/16/2016
End Date: 10/27/2016
X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay
Site: PB Z Pad
Rig Name/No.: NORDIC 2
Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA
UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
NPT Depth Phase
Description of Operations
(hr)
(usft)
19:00 - 20:45 1.75
DRILL P
PROD1
RUN DOWN AND LOG TIE-IN WITH +16'
CORRECTION.
- NO ISSUES PAST WINDOW. RIH AT 1.0 BPM
ALL THE WAY TO BOTTOM. HOLE
CONDITIONS VERY FAVORABLE. MINOR
AREAS OF ERRATIC WEIGHT BUT OVERALL
GOOD TRIP DOWN.
20:45 21:30 0.75
DRILL P
PROD1
DRILL 4.25" LATERAL FROM 11,735' MD TO
11,778' MD
FREE SPIN: 3860 PSI, 2.63 BPM
RATE: 2.65-2.82 BPM IN, 2.58-2.77 BPM OUT.
CIRC PRESSURE: 4,045 - 4,320 PSI
MUD WEIGHT: 9.62 PPG IN (NEW MUD), 9.52
PPG OUT, ECD: 11.1 PPG
- ROP ERRATIC AT 25-65 FT/HR
BECAME DIFFERENTIALLY STUCK
21:30 00:00 2.50
DRILL N STUC
-
11,778.00 PROD1
WORK PIPE PER WELL PLAN, CBU AND THEN
RELAX.
- ALLOW TO RELAX AND RE -ATTEMPT TO
WORK PIPE FREE. CANNOT GET FREE.
PUMP MINERAL OIL INTO PLACE, LOSSES
AT THIS TIME -8-10 BPH.
- MINERAL OIL WITH KCL SPACERS WORKED,
FREE AFTER SOAKING -2 MINUTES WHILE IN
TENSION.
- MOVE PIPE AND PERFORM WIPER WHILE
CIRCULATING PILL OUT.
MM PLUGGING SPORADICALLY WHILE
PUMPING BOTTOMS UP
10/26/2016 00:00 - 06:00 6.00 DRILL P PROD1 I DRILL 4.25" LATERAL FROM 11778' MD TO
11,925' MD
FREE SPIN: 3600 PSI, 2.60 BPM
RATE: 2.60 BPM IN, 2.55 BPM OUT. CIRC
PRESSURE: 3700-4200 PSI
- MUD WEIGHT: 9.67 PPG IN, 9.56 PPG OUT,
ECD: 11.23 PPG
- ROP: 60-80 FT/HR, WOB: 1.5 - 3.0 KLB
START WIPER TO WINDOW. PREPARE FOR
— MUD SWAP.
06:00 09:30 3.50 DRILL P PROD1 PULL UP THROUGH SHALE. PULLED HEAVY
AT 11445', WORK THROUGH.
- CONTINUE TRIP UP WITH ONLY SLIGHT
BOBBLES BUT NO REAL ISSUES. PULL INTO
WINDOW, CIRCULATE HI -VIS SWEEP DOWN
ANDAROUND. HAVE TO BLOW DOWN
MICROMOTION SEVERAL TIMES.
- AVERAGE PICK UP WEIGHT 42K. TRIP
UPCLEAN WITH NO ISSUES OR OVERPULLS.
- PULL INTO WINDOW, OPEN EDC. JET
ACROSS WINDOW. CIRCULATE HI -VIS PILL
DOWN AND THEN CHASE OUTAT4.05 BPM,
4025 PSI, WHILE PULLING UP HOLE SLOWLY.
MICROMOTION NEEDED BLOWING DOWN
SEVERAL TIMES WITH HI -VIS PILL COMING
UP AND THEN AGAIN WITH SECOND
BOTTOMS UP.
- SHAKER CLEANED UP, CLOSE EDC. LOG
TIE-IN GOING DOWN WITH +13'
CORRECTION.
- MW IN 9.51 PPG, MW OUT 9.50 PPG,
LOSSES OF 6-8 BPH
Printed 11/7/2016 11:10:01AM *All depths reported in Drillers Depths*
North America - ALASKA - BP
Operation Summary Report
Common Well Name: Z-23 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016 X3-017YD-C: (3,155,216.00)
Page 19 of 21
Project: Prudhoe Bay Site. PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA
UWI 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth
Phase Description of Operations
(hr) (usft)
09:30 - 12:15 2.75 DRILL N DPRB 11,445.00
PROD1 RIH WITH BHA CIRCULATINGAT.53 BPM, 1385
PSI. VERY CLEAN TRIP DOWN. FIRST
INDICATIONS OF SET DOWN AT 11,247'.
ANOTHER SET DOWN AT 11,297'.
- COME ON WITH PUMPS TO 2.72 BPM, 3700
PSI. TAKING WOB AND -200 PSI
DIFFERENTIAL WORK TO GET DOWN. FIGHT
DOWN TO 11,725' BUT ONLY MOVING AT 2-4
FPM AND AS MUCH AS -15K SLACK OFF
WEIGHT.
- DISCUSS WITH TOWN, DECIDE TO
CONDUCT ANOTHER WIPER IN ATTEMPT TO
CLEAN HOLE
12:15 17:00 4.75 DRILL N DPRB 11,300.00
PROD1 - PICK UP CLEAN. TRIP UP RELATIVELY
CLEAN WITH NO ISSUES OR OVERPULLS.
STOP AT 11,200' AND TURN AROUND TO SEE
IF BHA CAN GET DOWN EASILY. VERY
PROBLEMATIC, AGAIN TAKING WOB AND
DIFFERENTIAL MOTORWORK TO MOVE
DOWN AT 4 FPM. TURN AROUND AT 11,300'.
- PICK UP TO RESUME WIPER TO WINDOW,
OVERPULLAT 11,020'
PULL INTO WINDOW, OPEN EDC. JET
ACROSS WINDOW, OPEN EDC AND
CONTINUE TO JET. CBU WITHOUT USE OF
PILLS, PEA -SIZE CUTTINGS ACROSS SHAKER
AND HAVE TO PURGE MICROMOTION 4
TIMES.
RUN BACK TO WINDOW WITH HI -VIS PILL
EXITING EDCATWINDOW. CBUAGAIN,
MORE PEA -SIZE RETURNS BUT LESS
VOLUME. BLOWDOWN MICROMOTION
SEVERAL TIMES BUT THEN RETURNS
CLEANED UP.
- TURNAROUND AND CLOSE EDC,
COMPLETE WIPER TRIP BACK TO BOTTOM.
HOLE IN GOOD CONDITION, NOTHING
REMARKABLE ABOUT TRIP DOWN UNTIL
11,031'; SET DOWN AT 11,031'. PICKUP,
WORK THROUGH AND CONTINUE DOWN.
- HAVE TO BRING ON PUMPSAT 11,200' TO 2.8
BPM, 3880 PSI TO WORK DOWN. WORK
DOWN WITH POSITIVE SLACK OFF WEIGHT
OF 11-12K, 1.25K WOB AND -200 PSI
MOTOROWRK. SLACK OFF WEIGHT
EVENTUALLY FALLS OFF.
- NOT MAKING MUCH PROGRESS PAST
11,360'. PICK UP OFF BOTTOM WHILE
TALKING TO ODE DUE TO STICKINESS.
- MW IN 9.55 PPG, MW OUT 9.51 PPG,
_,- -
LOSSES RANGING FROM 5-8 BPH
17:00 20:00 3.00 DRILL N DPRB 11,300.00
PROD1 PICK BACK UP HOLE WHILE TOWN
DISCUSSES OPTIONS.
- PICK UP CLEAN. AVERAGE PICK UP
WEIGHT STARTED AT 42K, DROPPED OFF TO
38KAT WINDOW. TRIP UP RELATIVELY
CLEAN WITH NO ISSUES OR OVERPULLS.
- PULL INTO WINDOW, OPEN EDC. JET
ACROSS WINDOW.
CIRCULATE LO -VIS / HI -VIS COMBO DOWN
MICROMOTION PLUGGED. RECTIFY BY
BACKFLUSHING.
Printed 11/7/2016 11:10:01AM *All depths reported in Drillers Depths*
North Amedca - ALASKA - BP
Operation Summary Report
Common Well Name: Z-23 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/16/2016 End Date: 10/27/2016 X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay Site: PBZ Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:00AM Rig Release: 10/30/2016
Page 20 of 21
Rig Contractor: NORDIC CALISTA
UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To
Hrs
Task
Code NPT
NPT Depth
Phase
Description of Operations
—
(hr)
(usft)
20:00 - 21:00
1.00
DRILL
N DPRB
11,300.00
PROD1
RIH FROM WINDOW TO 11353' MD
- RATE: 0.40 BPM IN, 0.52 BPM OUT. CIRC
PRESSURE: 1300 PSI
MUD WEIGHT: 9.58 PPG IN, 9.50 PPG OUT
FROM 11263' WOB INCREASING DOWN TO A
UNCORRECTED TAG AT 11353'
PICK OFF BOTTOM CLEAN. PU WEIGHT 40K
21:00 - 00:00
3.00
DRILL
N DPRB
11,300.00
PROD1
PERFORM WIPER TRIP TO WINDOW FROM
11 353'MD TO WINDOW
- RATE: 2.93 BPM IN, 2.61 BPM OUT. CIRC
PRESSURE: 4102 PSI
CLEAN TRIP FROM BOTTOM TO WINDOW.
OPEN EDC AT WINDOW. JET TRAY
RATE: 4.21 BPM IN, 4.13 BPM OUT.
PUMPED LO / HI VIS COMBO SWEEP. NO
INCREASE IN CUTTINGS SEEN.
MICROMOTION PLUGGED UP THREE TIMES.
LOG DOWN FOR TIE-IN FROM 9300' TO 9325'
MD (RA TAG) WITH +11.5' CORRECTION
CHASE UP TO 8400'
10/27/2016 00:00 - 01:00
1.00
DRILL
N DPRB
11,300.00
PROD1
LOG CCL FROM 8400' WHILE CIRCULATING
HOLE.
HOLE CLEAN UP
01:00 02:30 1.50 DRILL N DPRB 11,300.00 PROD1 GETTIING 1 PPM H2S READING AT SHAKER.
VERIFY WITH HAND HELD GAS METER.
DISCUSS WITH SUPERINTENDENT.
MUD ENGINEER GOING TO TREAT WITH H2S
SCAVENGER.
PERFORM FLOW CHECK. WELL ON 2-3 BPH
LOSS.
RETURNS CLEANING UP. RIH AND VERIFY
TIE IN -0.5' CORRECTION.
02:30 05:10 2.67 DRILL N DPRB 11,300.00 PROD1 CLOSE EDC. RIH TO VERIFY BOTTOM
RATE: 0.42 BPM IN / 0.42 BPM OUT
MW IN: 9.54 PPG, MW OUT 9.50 PPG OUT.
NO ISSUES WITH RUN IN HOLE. RUN BY
LAST TAG OF 11353'. RUN IN HOLE TO 11420'
-PICKUP THROUGH SHALE. SLIGHT
OVERPULLAT 11350'
CALL SUPERINTENDENT AND DISCUSS PLAN
CHANGE. DECISION TO HEAD TO BOTTOM
05:10 - 07:00 1.83 DRILL P PROD1 RIH WITH CAUTION. SLIGHT TAG AT 11360'.
PU AND RUN BACK DOWN AND TAG AT 11370'.
START TO PU AND POPPED BY.
RIH TO 11750'. PERFORM CLEAN PICK UP
43K. CONTINUE IN TO A CORRECTED TD OF
11927'. MIX 2PPB STICKLESS BEADS IN
LINER RUNNING PILLAND SEND DOWN COIL.
Printed 1117/2016 11:10:01AM *All depths reported in Drillers Depths*
North America - ALASKA - BP
Operation Summary Report
Page 21 of 21
Common Well Name: Z-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 10/16/2016 End Date: 10/27/2016
X3-017YD-C: (3,155,216.00)
Project: Prudhoe Bay
Site: PB Z Pad
Rig Name/No.: NORDIC 2
Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA
UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT NPT Depth Phase
Description of Operations
(hr)
(usft)
07:00 14:20 7.33
DRILL P PROD1
START LAYING BEADS IN FROM CORRECTED
TD OF 11,927'
- LAY IN LINER PILLAT 1.0 BPM WHILE
PULLING AT 50 FPM ON TRIP UP HOLE TO
WINDOW. TRIP WAS VERY SMOOTH, NO
ISSUES OR BOBBLES. OPEN EDC, FLUSH
ACROSS WINDOW SEVERAL TIMES.
- SEND NEW 9.5 PPG MUD DOWN COIL TO
CIRCULATE OLD MUD OUT OF SYSTEM AT 3.8
BPM. PACK OFF MICROMOTION WHEN
PUMPING AT HIGH RATES RIGHT INSIDE OF
WINDOW.
- CIRCULATE NEW MUD AROUNDAT.53 BPM,
810 PSI (WAITING ON SECOND TRUCK TO
ENSURE FLUID REQUIREMENTS AT SURFACE
ARE MET BEFORE PULLING).
CIRCULATE FROM WINDOW TO KEEP
CUTINGS IN POSITIVE FLOW UPWARDS.
PUMP DOWN 20 BBL LO -VIS / 10 BBL HI -VIS
SWEEP, RETURNS BROUGHT UP MORE
PEA -SIZE CUTTINGS BUT MICROMOTION DID
NOT PLUG OFF.
BRING RATE UP TO 4.35 BPM, 4050 PSI
WHILE PULLING UP HOLE TO SURFACE
- JOG DOWN NUMEROUS TIMES WITH
DIMINISHING CUTTINGS DURING EACH JOG.
LOSSES AVERAGED 4 BPH ON TRIP UP.
PULL BHA TO SURFACE, FLOW CHECK.
FLOW CHECK GOOD.
PULL BHA INTO BOP, POP OFF
14:20 15:00 0.67
DRILL P PROD1
LD BHA. BHAAND COIL COVERED WITH
STICKY, BLACK COATING. BIT GRADE
1 -1 -NO.
SEE CON REPORT FOR CONTINUED
OPERATIONS SUMMARY
Printed 11/7/2016 11:10:01AM 'All depths reported in Drillers Depths`
Printed 11/7/2016 11:10:32AM `All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 1 of 5
Operation Summary Report
Common Well Name: Z-23
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 10/27/2016 End Date: 10/30/2016
X3-017YD-C: (1,720,544,00)
Project: Prudhoe Bay
Site: PB Z Pad
Rig Name/No.: NORDIC 2
Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA
UN: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT NPT Depth Phase
Description of Operations
_ (hr) -- — — (hr)
-
I (usft
— — )
- --
10/27/2016 15:00 - 23:30 8.50
CASING P RUNPRD
STAND INJECTOR TO SIDE. CHANGE OUT
PACKOFFS, PRESSURE TEST,
PUMP SLACK FORWARD, CUT 385' OF ELINE
AND 220' OF PIPE.
PREP COILAND INSTALL BOT CTC.
PRESSURE TEST TO LOW 300 / HIGH 3750
GOOD TEST
-INSTALL CAP / TEST PLUG. PT PACKOFFS
-PREPARE FLOOR FOR LINER RUN
23:30 00:00 0.50
CASING P RUNPRD
MAKE UP SHOE TRACKAND START RUNNING
2-7/8" LINER
10/28/2016 00:00 06:00 6.00
CASING P RUNPRD
CONTINUE TO MAKE UP LINER PER THE
APPROVED SUMMARY.
FILL PIPE EVERY 20 JOINTS.
MAKE UP LINER RUNNING TOOLAND PH6.
TEST QTS TO 300# LOW / 4000# HIGH
0600 08:15 2.25
CASING P RUNPRD
RIH WITH 2 -7/8"X3 -1/4"X3-1/2" LINER
ASSEMBLY
- WINDOW FLAG ON DEPTH, PICK UP
WEIGHT AT WINDOW 43K, SLACK OFF
WEIGHT 20K.
-RUN INTO OPEN HOLE. NO ISSUES AND
FAIRLY SMOOTH TO 11,000'. BEGIN TO WORK
AT GETTING DOWN. HAVE TO PICK UP AND
WORK THROUGH 11,215'.
0815 14:15 6.00
CASING P RUNPRD
WORK PIPE TO GET DOWN
- VARY FLOW RATES AND RUNNING SPEEDS,
USE RECIPROCATION TO WORK PIPE DOWN
- ENCOUNTERING SIGNIFICANT RESISTANCE
ALL THE WAY DOWN TO 11,459'. CANNOT
WORK PAST 11,459'. PICK UP AND ATTEMPT
HIGH RUN IN RATE, NO GO. ATTEMPT TO
WORK THROUGH WITH NO PUMPS, PUMPING
AT 1.0 BPM, PICKING UP TO WORK
THROUGH. NO-GO. PICK UP TO GET
RUNNING START, STACKING OUTAT 11,305'.
CONTINUE WITH ATTEMPTS WHILE
MINERAL OILAND SPACER PILLS ARE BEING
LINED UP. PUMP DOWN 15 BBL HI -VIS / 16
BBL MINERAL OIL/ 15 BBL HI -VIS COMBO.
- ABLE TO GAIN BETWEEN 10-30' EACH TIME
PIPE IS WORKED.
Printed 11/7/2016 11:10:32AM `All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 2 of 5
Common Well Name: Z-23
00:00
3.00
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 10/27/2016
End Date: 10/30/2016
X3-017YD-C: (1,720,544.00)
Project: Prudhoe Bay
Site: PB Z Pad
Rig Name/No.: NORDIC 2
Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor. NORDIC CALISTA
UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
NPT Depth Phase
Description of Operations
(hr)
(usft)
14:15 - 16:30 2.25
CASING P
RUNPRD
CIRC PRESSURES ARE LIMITING FACTOR
16:30 - 21:00 4.50 CASING P
21:00
00:00
3.00
CASING
P
10/29/2016 00:00
01:00
1.00
CASING
P
DUE TO RUNNING ASSEMBLY RESTRICTIONS
TO 1800 PSI.
-MINERAL OIL OUT AND INTO FORMATION.
PUMPING 1-2 BBLS EACH TIME IN ATTEMPT
TO PROLONG SLIDING DURATION.
- SLACK OFF WEIGHT HAS GONE FROM
POSITIVE WEIGHT DOWN TO 11,375' TO
NEGATIVE WEIGHTS AS COIL IS BEING
PUSHED BY FILL OR DEBRIS.
PICKUP WEIGHT HAS INCREASED FROM
43K IN CASED HOLE (VERY SIMILAR PUW
WHILE DRILLING ON BOTTOM ALSO) TO AS
HIGH AS 63K WHEN PICKING UP AFTER
STACKING OUT WHEN WORKING PIPE.
- REST OF MINERAL OIL OUT, NO MOVEMENT
PAST 11,550'. PICK UP IN ATTEMPT TO
'CHARGE DOWN, NO MOVEMENT PAST
11,529'. PICK UP WAS HEAVYAT 73K. BRING
ON PUMPS TO HIGHEST RATE OBTAINABLE
WITHIN THE 1800 PSI LIMIT.
- INITIAL CIRCULATION AT 1.30 BPM, 1600 PSI,
'OUT RATE OF 1.12 BPM FOR LOSS AVERAGE
OF 10 BPH. SETTING DOWN WITH 12K OF
INJECTOR "PUSH", NO MOVEMENT FROM
11,516' KEEP WORKING PIPE.
- DISCUSS OPTIONS WITH ODE, GIVEN
NOTICE TO SET ON DEPTH AT 11,516'. PERF
MEMO IS BEING REVISED.
RUNPRD BEGIN TO DISPLACE FROM 9.5 PPG MUD
SYSTEM TO 8.5 KCL SYSTEM.
DISPLACE TO 1% KCL W/ 0.6% CFS -520.
MANIPULATE LINER UP AND DOWN WHILE
CYCLING PUMPS WHEN WELL ROLLED OVER
TO KCL
APPLIED PRESSURE TO WELLBORE AND
DUMP CHOKE.
DISCUSS PLAN FORWARD WITH ODE.
RUNPRD DISCUSS WITH BOT REP. BRING PUMP RATE
UP
2.61 BPM IN / 2.54 BPM OUT IN AN ATTEMPT
TO GET MOVEMENT. APPEARS TO BE A
SOLID TAG AT THE -11550'
MIX UP 20 BBL HI VIS SWEEP
PUMP INTO OPEN HOLE. ATTEMPT PU AND
RUN AT. NO GO. CONTINUE CIRCULATING.
RUNPRD RELEASE FROM LINER
LAUNCH 5/8" STEEL BALL
DISPLACE BALL: 3.4 BPM AT 2400 PSI
REDUCE PUMP RATE TO 0.75 BPM (700 PSI)
AT 30 BBLS AWAY
BALL LANDED WITH 40 BBLS AWAY
PRESSURE UP, BALL SEAT SHEARED AT
3700 PSI
- PU: 40K, CONFIRM LINER RELEASED
Printed 11/7/2016 11:10:32AM *All depths reported in Drillers Depths*
North America - ALASKA - BP
Operation Summary Report
Page 3 of 5
Common Well Name: Z-23
AFE No
Event Type: COM- ONSHORE (CON) Start Date: 10/27/2016 End Date: 10/30/2016
X3-017YD-C: (1,720,544.00)
Project: Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA
UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase
Description of Operations
(hr) (usft)
-
01:00 04:00 3.00 CASING P RUNPRD
MIX AND PUMP 28.0 BBLS OF CEMENT:
- FILL LINES WITH WATER AND PRESSURE
TEST TO 5000 PSI FOR 5 MINUTES
CEMENT WETAT02:15 HRS.
ZERO IN MM ONCE DENSITY = 13.5 PPG
LOAD 28 BBLS 15.3 PPG CEMENT IN REEL
SWAP TO RIG PUMP. CLEANUP LINES TO
SLB UNIT.
PERFORM DISPLACEMENT WITH RIG PUMPS
- DISPLACE CEMENT WITH 8.4 PPG EXHAUST
PILL
-RATE: 2.59 BPM IN, 2.50 BPM OUT 1600#
CIRC PRESSUREO
- ZERO OUT MM WITH CEMENTAT SHOE AT
73.5 BBLS AWAY
- TAKE RETURNS TO PIT 4 FOR MANUAL
STRAP (3 BBLS START STRAP)
- SHUT DOWN PUMPS AT 80.3 BBLS AWAY (6.5
BBLS BEHIND PIPE)
LAUNCH PEEWEE DART AND LINER WIPER
PLUG AS FOLLOWS:
- PICK UP TO BREAKOVER +12 FT (11526' MD)
PER BTT REP, EXPOSE DOGS, SET DOWN AT
11541' MD (10 FT HIGHER)
- SET DOWN 10KAT 11541' MD AND LAUNCH
PEE WEE DART. RESSURE UP TO 1500#
- SHIFT LINER WIPER PLUG DOWN, PICK
BACK UP TO 11530' MD AND SIDE EXHAUST 5
BBLS
PRESSURE UP ON WIPER PLUG TO 2000#
AND ZERO MM.
- LINER WIPER PLUG SHEARED AT 3850 PSI
(0.4 BBLS)
DISPLACE LINER WIPER PLUG
19.3 BBLS DISPLACED AT 1.8 BPM: 2400 PSI
PLUG BUMPED AT 19.3 BBLS, 3500 PSI (19.2
BBLS CALCULATED)
- OPEN BAKER CHOKE AND CHECK FLOATS.
GOOD TEST.
- CLOSE BAKER CHOKE, PRESSURE UP TO
1500 PSI ON COIL, PICKUP AND CONFIRM
PRESSURE DROP
CEMENT IN PLACE: 03:54 HRS
25.0 BBLS CEMENT BEHIND PIPE, BASED ON
MANUALSTRAP.
- TOTAL LOSSES FROM CEMENT EXIT SHOE
TO CEMENT IN PLACE: 3 BBLS
04:00 04:50 0.83 CASING P RUNPRD
JET ON LINER TOP TO CHASE CEMENT AWAY
FROM LINER WITH 10 BBLS
UNSTING FROM LINER TOP. JETACROSS
GLM #1.
CIRCULATE CEMENT OUT OF HOLE. 3.25
BPM IN / 3.16 BPM OUT
RETURNS CLEANED UP. BRING RETURNS
INSIDE.
04:50 06:00 1.17 CASING P RUNPRD
MONITOR WELL FOR 10 MINUTES: STATIC
MUD WEIGHT: 8.44 PPG IN, 8.38 PPG OUT
RATE: 2.61 BPM IN, 2.22 BPM OUT
06:00 07:20 1.33 CASING P RUNPRD
POH TO SURFACE. FLOW CHECKAT
SURFACE FOR 10 MINUTES, NO FLOW.
- PULL BHA INTO BOP, POP OFF AND STAND
INJECTOR TO SIDE
Printed 11/7/2016 11:10:32AM *All depths reported in Drillers Depths*
North America - ALASKA - BP
Operation Summary Report
Page 4 of 5
Common Well Name: Z-23 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 10/27/2016 End Date: 10/30/2016 X3-017YD-C: (1,720,544.00)
Project: Prudhoe Bay Site: PB Z Pad
Rig Name/No.: NORDIC 2 Spud Date/Time: 6/7/1989 12:00:OOAM Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (usft)
07:20 06:15 0.92 CASING P RUNPRD LD BHA. RECOVER 5/8" BALL.
- CLEAR AND CLEAN RIG FLOOR. CUT COIL
CONNECTOR AND INSTALL, PRESSURE AND
PULL TEST INTERNAL CONNECTOR.
08:15 10:15 2.00 PERFOB P OTHCMP INSPECT CERTS FOR HALLIBURTON
EQUIPMENT.
- LOAD IN PERF GUNS WHILE CONTINUING
TO PREP FOR PERF RUN
10:15 10:30 0.25 PERFOB P OTHCMP PJSM FOR PICKING UP PERFORATION
ASSEMBLY.
- DISCUSS LIFTING, HANDLING OF GUNS AND
REST OF BHA, SAFETY JOINT AND XO,
MARKING OFF CELLAR AND RIG FLOOR, H2S
CONDITIONS AND MUSTER AREA
- CALL TO SITE CONTROL TO LIMIT
MOVEMENT TO RIG
10:30 - 15:00 4.50 PERFOB P OTHCMP MU 2.0" PERF BHA#8
- MU GUNS ACCORDING TO PERF MEMO. MU
FIRING HEAD WITH 5-1/2 HR DELAY ON
ACTIVATION TO GIVE IT TIME TO RIH.
-MU RUNNING ASSEMBLY AND WORK
STRING PER RUNNING ORDER.
CONDUCT KICK WHILE MAKING UP JOINTED
PIPE DRILL WITH SIMULATED FLOWAT
ROTARY. CREW RESPONDED IMMEDIATELY
BY PICKING UP SAFETY JOINT (ALREADY
TORQUED UP WITH FSVAND LIFT SUB) AND
MAKING UP TO ASSEMBLY, TORQUE AND
CLOSE WITH KEY IN 2 MINUTES. GIVEALL
CLEAR.
- COMPLETE MAKE-UP OF RUNNING TOOLS,
STAB ON WITH INJECTOR
15:00 17:00 2.00 PERFOB P OTHCMP PRESSURE TEST QUICK TEST SUB, RIH WITH
ASSEMBLY
- RIH, TAG PBTD AT UNCORRECTED DEPTH
OF 11,533'. CONFIRM WITH 3ITERATIONS.
PICK UP TO NEUTRAL, CORRECT CTDS
DEPTH TO PBTD DEPTH OF 11,537' FROM
LINER RUN
- PICK UP HOLE TO SET BOTTOM OF GUNS
ON DEPTH AT 11,306.50-
17 00
1,306.50'17:00 18:00 1.00 PERFOB P OTHCMP PJSM FOR PRESSURE TESTING AND CYCLE
FOR PERFORATING.
- CLOSE IN AND BRING UP CIRCULATION
RATE IN ATTEMPT TO CONDUCT PRESSURE
TEST CEMENTED LINER LAP TO 2400 PSI.
PRESSURE BROKE OVER AT 2180 PSI AT 1.65
BPM AND COULD NOT BUILD ANY FURTHER
PRESSURE. STOP TEST.
TEST DID NOT PASS BP CRITERIA
LINE UPAND BEGIN PRESSURING CYCLE
FOR PERFORATION. COMPLETE CYCLE PER
PLAN, DEFINITE INDICATION OF SHOTS
FIRING FROM AUDIBLE AND FLUID LOSS.
INITIAL LOSSES AT 26 BPH, TAPERED OFF AS
BHA CAME UP HOLE.
PERFORATION INTERVAL 10,495' TO 11,304'
18:00 19:25 1.42 PERFOB P OTHCMP PICKUP FROM FIRING AND CLOSE IN TO
HOLD 225-250 PSI BACK PRESSURE AS BHA
IS PULLED THROUGH LINER
RATE: 2.07 BPM IN / 1.87 BPM OUT
MW: 8.48 PPG IN / 8.45 PPG OUT
Printed 11/7/2016 11:10:32AM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 5 of 5
Common Well Name: Z-23
AFE No
Event Type: COM- ONSHORE (CON)
Start Date:
10/27/2016 End Date: 10/30/2016 X3-017YD-C: (1,720,544.00)
Project: Prudhoe Bay
Site: PB Z
Pad
Rig Name/No.: NORDIC 2
Spud Date/Time: 6/7/1989 12:00:OOAM
Rig Release: 10/30/2016
Rig Contractor: NORDIC CALISTA
UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
Date From - To
Hrs
Task
Code NPT NPT Depth
Phase Description of Operations
(hr)
(usft)
19:25 - 1940
0.25
PERFOB
P
OTHCMP AT LINER TOP. OPEN CHOKE FULLY.
PERFORM 10 MIN FLOW CHECK. WELL
--
STATIC.
19:40 - 22:30
2.83
PERFOB
P
OTHCMP - MUD WEIGHT: 8.42 PPG IN, 8.44 PPG OUT
RATE: 1.82 BPM IN, 1.13 BPM OUT
22:30 - 23:30
1.00
PERFOB
P
OTHCMP ! PERFORM 10 MIN FLOW CHECK WELL STATIC
LAY DOWN 2-1/16" CS HYDRIL. 70 JOINTS
1-1/4" HYDRIL
23:30 - 00:00
0.50
PERFOB
P
OTHCMP PJSM WITH TCP CREW. MAKE
ANNOUNCEMENTS. BARRICADE CELLAR.
LAY DOWN FIRING HEAD. START LAYING
DOWN FIRED GUNS.
10/30/2016 00:00 - 0200
2.00
PERFOB
P
OTHCMP FINISH LAYING DOWN PERF GUNS.
MAKE UP FREEZE PROTECT BHA
02:00 - 03:30
1.50
WHSUR
P
POST RIH WITH NOZZLE TO 2500'
LAY IN 38 BBLS DIESEL WITH 100' METHANOL
CAPACROSSTREE.
TAG UP. VALVE CREW SERVICE TREE.
CLOSE MV / SWAB. PERFORM LTT TO 3500#,
HOLD PRESSURE WHILE BLOWING DOWN.
03:30 - 04:00
0.50
CONDHL
P
POST PJSM, RU HALLIBURTON NITROGEN
PERFORM PRESSURE X -CHECK.
PERFORM 300# LOW/ 3900# HIGH. SET AND
TEST TRIPS AT 3700#
04:00 - 06:00
2.00
CONDHL
P
POST SPEAR INTO REEL WITH 5 BBLS METHANOL
COME ONLINE WITH NITROGEN. BLOW
REEL DOWN.
06:00 12:00
6.00
WHSUR
P
POST CONTINUE WITH RIG DOWN DOWN
OPERATIONS.
- OPEN BOP DOORS TO INSPECT, CLEAN
RAMS. RAMS HAD "STICKY" RESIDUE AND
WELLBORE CUTTINGS RESIDUE IN THE
CAVITIES.
- ORDERED OUT HOT, SLIGHTLY SOAPY
WATER TO CLEAN PITS OF SAME "STICKY"
RESIDUE TO AVOID CONTAMINATING NEW
MUD SYSTEM ON NEXT WELL.
- MOVING SUPPORT EQUIPMENT OFF
LOCATION
- SUBMIT NOTICE FOR BOP TEST TO AOGCC
AT 1115 HRS ON 10/30/2016 FOR 1500 HRS
START TIME ON 10/31/2016
- TREE CAP INSTALLED, TESTED. WELL
SECURE. RIG RELEASE 1200 HRS.
- SEE RON EVENT FOR DS 7-15 FOR FOLLOW
ON OPERATIONS.
Printed 11/7/2016 11:10:32AM *All depths reported in Drillers Depths*
Z -23C (Post -Rig Sidetrack)
T/I/O = 0/0/0. R/D Test Spool #03 . Installed tree cap flange and PT'd to 4000 psi (PASSED)
11/1/2016
RDMO ***Job Complete*** SEE LOG FOR DETAILS. Final T/I/O = 0/0/0.
***WELL S/I ON ARRIVAL*** (ctd)
DRIFT TBG & LINER TO DEV @ 9,287' SLM (s.bailer empty)
LOG FROM 9,000' SLM TO 8,000' SLM w/ SLB MEMORY LOG (good data)
TAG DEPLOYMENT SLEEVE W/ 4-1/2" PTSA STINGER DRIFT @ 8,660' SLM/ 8,692'
11/4/2016
MD.
SET 45KB LTP w/ PTSA STINGER (12.83' OAL) 8660' SLM / 8692' MD
LRS PERFORM PASSING MIT -T. (see Irs log)
PULLED 2-7/8" XX PLUG FROM PTSA @ 8658' SLM
SET 4-1/2" WHIDDON CATCHER SUB @ 8,655' SLM.
PULLED RK-DGLVs FROM ST #5 @ 4,995' MD & 3095' MD
SET RK-LGLV IN ST #6 @ 3095' MD
11/5/2016
ATTEMPT TO SET RK-OGLV IN ST #5 @ 4995' MD
**WSR continued from 11 -4-16**T/1/0=7/0/1 01 Assist slickline (PT LTP) MIT T
**PASSED** to 2620 psi. Max applied psi = 2700 psi. Target pressure = 2430 psi. Pumped
3.5 bbls of crude down tbg to reach test pressure. 15 min T lost 65 psi. 30 min T lost 26 psi.
Total loss of 91 psi in 30 mins. Bled TP back to 62 psi. Bled back 2 bbls. Slickline still on
11/5/2016
well at LRS departure. FWHP= 62/vac/101.
North America - ALASKA - BP
Prudhoe Bay
PB Z Pad
Z-23
Z -23C
500292195003
Design: Z -23C
Final Survey Report
01 November, 2016
we P P -_-
'A kv
BAKER
HUGHES
20.00
by
BP
RUN
;,.•�
Final Survey Report
BAKER
HUGHES
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well Z-23
Project:
Prudhoe Bay
TVD Reference:
Z-23B @ 81.06usft (Doyon 16)
Site:
PB Z Pad
MD Reference:
Z-23B @ 81.06usft (Doyon 16)
Well:
Z-23
North Reference:
True
Wellbore:
Z-23C
Survey Calculation Method:
Minimum Curvature
Design:
Z-23C
Database:
EDM RSK- Alaska PROD -ANCP1
Project
Prudhoe Bay, GPB, PRUDHOE BAY
Map System:
US State Plane 1927 (Exact solution)
System Datum:
Mean Sea Level
Geo Datum:
NAD 1927 (NADCON CONUS) -
Using Well Reference Point
Map Zone:
Alaska Zone 04
Using geodetic scale factor
Site
PB Z Pad, TR-11-12
Site Position:
Northing:
5,957,230.170 usft Latitude:
70° 17'33.051 N
From:
Map
Easting:
601,304.820 usft Longitude:
149° 10'47.365 W
Position Uncertainty:
0.00 usft
Slot Radius:
0.000 in Grid Convergence:
0.77 °
Well
Z-23
Well Position
+NI-S 0.00 usft
Northing:
5,959,360.030 usft
Latitude:
70° 17'54.240 N
+EI-W 0.00 usft
Easting:
599,459.070 usft
Longitude:
149° 11'40.333 W
Position Uncertainty 0.00 usft
Wellhead Elevation: 55.36 usft
Ground Level:
56.02 usft
Wellbore
Z-23C
Magnetics
Model Name Sample Date
Declination
Dip Angle Field Strength
(nT)
BGGM2016 11/1/2016
18.06
80.97 57,554
Design
Z-23C
Audit Notes:
Version.
Phase:
ACTUAL
Tie On Depth: 9,263.64
Vertical Section:
Depth From (TVD)
+NI-S
+EI-W Direction
(usft)
(usft)
(usft) (I
—
25.70
0.00
0.00 120.00
11/1/2016 1:23:32PM Page 2 COMPASS 5000.1 Build 818
2rN b
Inc
BP
TVD
TVDSS
:. _a►` p
'►1�"
E/W
Final Survey Report
Easting
BAKER
V. Sec
(usft)
V)
V)
HUGHES
Company: North America - ALASKA - BP
(usft)
Local Coordinate Reference:
Well Z-23
(usft)
Project: Prudhoe Bay
(usft)
TVD Reference:
Z -23B @ 81.06usft (Doyon 16)
0.00
Site: PB Z Pad
-55.36
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
5,959,360.030
Well: Z-23
0.00
North Reference:
True
0.15
Wellbore: Z -23C
100.02
Survey Calculation Method:
Minimum Curvature
-0.08
Design: Z -23C
599,458.991
Database:
EDM R5K-Alaska PROD -ANCP1
200.02
Survey Program Date 11/1/2016
259.04
200.02
118.96
-0.17
From To
5,959,359.856
599,458.698
0.10
-0.241
(usft) (usft) Survey (Wellbore)
Tool Name
Description
300.02
218.96
100.02 4,000.02 Z -23A Srvy 1 GYD-GC MS (Z-23PB1)
GYD-GC-MS
Gyrodata gyrocompassing m/s
599,458.472
0.21
4,100.02 6,700.02 Z -23A Srvy 1 GYD-GC MS (Z-23)
GYD-GC-MS
Gyrodata gyrocompassing m/s
229.48
400.02
6,718.00 6,748.00 Z -23B Srvy 1 Inc+Trend (Z -23B)
INC+TREND
Inclinometer + known azi trend
5,959,359.398
599,458.283
6,809.92 9,263.64 Z -23B Srvy 2 MWD+IFR+MS (Z -23B)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
0.37
218.67
9,279.00 11,865.39 BHI MWD CTK 4-1/4" (Z -23C)
MWD
MWD - Standard
-1.15
5,959,359.011
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
V)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
25.70
0.00
0.00
25.70
-55.36
0.00
0.00
5,959,360.030
599,459.070
0.00
0.00
100.02
0.15
234.65
100.02
18.96
-0.06
-0.08
5,959,359.972
599,458.991
0.20
-0.04
200.02
0.22
259.04
200.02
118.96
-0.17
-0.37
5,959,359.856
599,458.698
0.10
-0.241
300.02
0.17
195.54
300.02
218.96
-0.35
-0.60
5,959,359.674
599,458.472
0.21
-0.35
400.02
0.23
229.48
400.02
318.96
-0.62
-0.80
5,959,359.398
599,458.283
0.13
0.38
500.02
0.37
218.67
500.02
418.96
-1.00
-1.15
5,959,359.011
599,457.934
0.15
-0.49
600.02
0.15
141.82
600.02
518.96
-1.36
-1.27
5,959,358.654
599,457.818
0.37
-0.42
700.02
0.41
180.59
700.01
618.95
-1.82
-1.19
5,959,358.195
599,457.901
0.31
-0.12
800.02
0.27
129.09
800.01
718.95
-2.33
-1.01
5,959,357.691
599,458.087
0.32
0.28
900.02
0.19
130.05
900.01
818.95
-2.58
-0.70
5,959,357.440
599,458.400
0.08
0.68
1,000.02
0.39
179.02
1,000.01
918.95
-3.03
-0.57
5,959,356.995
599,458.539
0.30
1.02
1,100.02
0.45
165.72
1,100.01
1,018.95
-3.75
-0.47
5,959,356.275
599,458.651
0.11
147
1,200.02
0.39
171.06
1,200.01
1,118.95
-4.47
-0.32
5,959,355.561
599,458.810
0.07
1.96
1,300.02
0.48
148.45
1,300.00
1,218.94
-5.16
-0.05
5,959,354.871
599,459.091
0.19
2.54
1,400.02
0.50
101.37
1,400.00
1,318.94
-5.60
0.60
5,959,354.437
599,459.744
0.39
3.32
1,500.02
0.73
100.25
1,499.99
1,418.93
-5.80
1.65
5,959,354.252
599,460.801
0.23
4.33
1,600.02
0.93
90.77
1,599.98
1,518.92
-5.93
3.09
5,959,354.146
599,462.241
0.24
5.64
1,700.02
1.32
83.32
1,699.96
1,618.90
-5.80
5.05
5,959,354.295
599,464.194
0.42
7.27
1,800.02
1.08
82.75
1,799.94
1,718.88
-5.55
7.13
5,959,354.576
599,466.270
0.24
8.95
11/1/2016 1:23:32PM
Page 3
COMPASS 5000.1 Build SIB
.%"0�BP FSa2
by Final Survey Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well Z-23
Project:
Prudhoe Bay
TVD Reference:
Z -23B @ 81.06usft (Doyon 16)
Site:
PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Well:
Z-23
North Reference:
True
Wellbore:
Z -23C
Survey Calculation Method:
Minimum Curvature
Design:
Z -23C
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
1,900.02
1.11
81.55
1,899.92
1,818.86
-5.29
9.02
5,959,354.862
599,468.159
0.04
10.46
2,000.02
1.17
88.42
1,999.90
1,918.84
-5.12
11.00
5,959,355.059
599,470.135
0.15
12.08
2,100.02
1.14
81.85
2,099.88
2,018.82
-4.95
13.00
5,959,355.254
599,472.137
0.14
13.74
2,200.02
1.08
86.49
2,199.87
2,118.81
-4.75
14.93
5,959,355.478
599,474.060
0.11
15.30
2,300.02
0.93
93.20
2,299.85
2,218.79
-4.74
16.68
5,959,355.514
599,475.810
0.19
16.81
2,400.02
0.74
118.35
2,399.84
2,318.78
-5.09
18.06
5,959,355.180
599,477.193
0.41
18.18
2,500.02
0.77
108.48
2,499.83
2,418.77
-5.61
19.26
5,959,354.677
599,478.406
0.13
19.49
2,600.02
0.76
139.30
2,599.82
2,518.76
-6.32
20.33
5,959,353.975
599,479.485
0.41
20.77
2,646.32
0.68
136.60
2,646.12
2,565.06
-6.76
20.72
5,959,353.547
599,479.881
0.18
21.33
13 318"
2,700.02
0.60
132.62
2,699.82
2,618.76
-7.18
21.15
5,959,353.129
599,480.314
0.18
21.91
2,800.02
0.51
170.47
2,799.81
2,718.75
-7.98
21.61
5,959,352.342
599,480.783
0.37
22.70
2,900.02
0.52
170.41
2,899.81
2,818.75
-8.86
21.76
5,959,351.457
599,480.944
0.01
23.28
3,000.02
0.33
192.45
2,999.80
2,918.74
-9.59
21.77
5,959,350.729
599,480.967
0.25
23.65
3,100.02
0.60
195.69
3,099.80
3,018.74
-10.38
21.57
5,959,349.941
599,480.774
0.27
23.87
3,200.02
0.19
208.80
3,199.80
3,118.74
-11.03
21.35
5,959,349.289
599,480.561
0.42
24.00
3,300.02
0.20
217.65
3,299.80
3,218.74
-11.31
21.16
5,959,349.003
599,480.378
0.03
23.981
3,400.02
0.37
137.91
3,399.80
3,318.74
-11.69
21.27
5,959,348.627
599,480.493
0.39
24.271
3,500.02
0.37
135.80
3,499.79
3,418.73
-12.16
21.71
5,959,348.162
599,480.941
0.01
24.88
3,600.02
1.74
337.73
3,599.78
3,518.72
-10.98
21.36
5,959,349.331
599,480.575
2.09
23.991
3,700.02
4.12
326.92
3,699.64
3,618.58
-6.57
18.83
5,959,353.712
599,477.981
2.43
19.59
3,800.02
4.68
325.94
3,799.35
3,718.29
-0.18
14.58
5,959,360.044
599,473.651
0.57
12.72
3,900.02
3.88
328.20
3,899.07
3,818.01
6.08
10.51
5,959,366.245
599,469.502
0.82
6.07
4,000.02
2.26
325.90
3,998.92
3,917.86
10.59
7.63
5,959,370.714
599,466.554
1.62
1.31
4,100.02
1.69
319.00
4,098.86
4,017.80
13.33
5.55
5,959,373.432
599,464.445
0.62
-1.86
4,200.02
1.55
288.59
4,198.82
4,117.76
14.87
3.30
5,959,374.946
599,462.176
0.86
-4.58
4,300.02
2.15
268.22
4,298.77
4,217.71
15.25
0.15
5,959,375.277
599,459.014
0.88
-7.50
11/1/2016 1:23:32PM
Page 4
COMPASS 5000.1 Build 81B
hh BP Feas
yam. by Final Survey Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well Z-23
Project:
Prudhoe Bay
TVD Reference:
Z -23B @ 81.06usft (Doyon 16)
Site:
PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Well:
Z-23
North Reference:
True
Wellbore:
Z -23C
Survey Calculation Method:
Minimum Curvature
Design:
Z -23C
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
4,400.02
2.02
255.22
4,398.71
4,317.65
14.74
-3.43
5,959,374.722
599,455.443
0.49
-10.34
4,500.02
1.62
262.96
4,498.66
4,417.60
14.12
-6.54
5,959,374.058
599,452.345
0.47
-12.72
4,600.02
1.35
271.58
4,598.62
4,517.56
13.98
-9.12
5,959,373.883
599,449.766
0.35
-14.89
4,700.02
1.07
257.81
4,698.60
4,617.54
13.81
-11.21
5,959,373.691
599,447.679
0.40
-16.61
4,800.02
0.93
241.19
4,798.59
4,717.53
13.22
-12.83
5,959,373.081
599,446.063
0.32
-17.73
4,900.02
0.80
231.62
4,898.57
4,817.51
12.40
-14.09
5,959,372.240
599,444.816
0.19
-18.40
5,000.02
0.86
244.05
4,998.56
4,917.50
11.64
-15.31
5,959,371.462
599,443.604
0.19
-19.08
5,100.02
0.76
250.22
5,098.55
5,017.49
11.08
-16.61
5,959,370.892
599,442.313
0.13
-19.93
5,200.02
0.58
247.76
5,198.55
5,117.49
10.67
-17.71
5,959,370.462
599,441.226
0.18
-20.67
5,300.02
0.67
249.45
5,298.54
5,217.48
10.27
-18.72
5,959,370.052
599,440.215
0.09
-21.35
5,400.02
0.75
248.17
5,398.53
5,317.47
9.82
-19.88
5,959,369.588
599,439.067
0.08
-2213
5,500.02
0.96
225.79
5,498.52
5,417.46
9.00
-21.08
5,959,368.744
599,437.870
0.39
-22.76
5,600.02
0.78
229.82
5,598.51
5,517.45
7.97
-22.21
5,959,367.707
599,436.763
0.19
-23.22
5,700.02
0.86
242.20
5,698.50
5,617.44
7.18
-23.39
5,959,366.902
599,435.590
0.19
-23.85
5,800.02
0.72
250.51
5,798.49
5,717.43
6.62
-24.65
5,959,366.326
599,434.341
0.18
-24.66
5,900.02
2.85
9.02
5,898.45
5,817.39
8.87
-24.85
5,959,368.569
599,434.109
3.26
-25.95
6,000.02
5.24
19.05
5,998.20
5,917.14
15.64
-22.97
5,959,375.365
599,435.900
2.48
-27.71
6,100.02
7.44
22.77
6,097.58
6,016.52
25.93
-18.97
5,959,385.704
599,439.759
2.24
-29.39
6,200.02
9.42
19.55
6,196.50
6,115.44
39.61
-13.73
5,959,399.454
599,444.822
2.03
-31.69
6,300.02
11.21
19.93
6,294.88
6,213.82
56.46
-7.67
5,959,416.382
599,450.650
1.79
-34.88
6,400.02
12.93
21.54
6,392.66
6,311.60
76.01
-0.25
5,959,436.023
599,457.812
1.75
-38.22
6,500.02
14.70
25.35
6,489.77
6,408.71
97.89
9.29
5,959,458.021
599,467.062
1.99
-40.9011
6,600.02
16.19
26.97
6,586.15
6,505.09
121.78
21.04
5,959,482.065
599,478.499
1.55
-42.66
6,700.02
18.08
28.71
6,681.71
6,600.65
147.81
34.82
5,959,508.279
599,491.930
1.96
-43.75
6,718.00
18.74
28.80
6,698.77
6,617.71
152.79
37.55
5,959,513.293
599,494.596
3.67
-43.871
95/81,
6,734.00
20.10
24.71
6,713.86
6,632.80
157.54
39.94
5,959,518.074
599,496.920
12.02
-44.181
11/1/2016 1:23:32PM
Page 5
COMPASS 5000.1 Build BIB
BP ri��
..,,.s by Final Surrey Report Has
HUGHES
Company:
North America - ALASKA- BP
Project:
Prudhoe Bay
Site:
PB Z Pad
Well:
Z-23
Wellbore:
Z -23C
Design:
Z -23C
Survey
MD
(usft)
6,748.00
6,809.92
6,905.74
7,001.11
7,095.11
7,185.50
7,280.04
7,373.61
7,466.08
7,561.90
7,653.80
7,749.78
7,840.56
7,933.11
8,029.57
8,126.87
8,224.65
8,320.16
8,405.39
8,502.06
8,596.05
8,690.49
8,784.16
8,849.33
8,913.00
DRILLING LINER 1
8,923.61
Inc
20.10
22.39
25.03
24.90
25.06
23.33
22.07
21.59
21.10
22.96
22.75
22.55
23.78
23.78
22.52
22.31
21.93
21.26
20.98
21.96
22.96
26.63
30.86
33.97
34.74
34.87
Azi (azimuth)
24.71
14.05
12.80
2.42
352.30
347.62
344.11
344.05
344.68
345.89
345.60
345.65
342.19
342.55
341.35
341.28
341.08
340.91
342.97
344.82
344.95
345.46
344.79
343.37
343.95
344.05
Local Coordinate Reference:
Well Z-23
TVD Reference:
Z -23B @ 81.06usft (Doyon 16)
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(olloousft)
6,727.01
6,645.95
161.91
41.95
5,959,522.470
599,498.873
0.00
6,784.74
6,703.68
183.03
49.27
5,959,543.680
599,505.907
7.24
6,872.46
6,791.40
220.51
58.19
5,959,581.268
599,514.332
2.80
6,956.96
6,877.90
260.26
63.51
5,959,621.084
599,519.125
4.59
7,044.21
6,963.15
299.78
61.68
5,959,660.570
599,516.770
4.54
7,126.66
7,045.60
336.24
55.27
5,959,696.938
599,509.885
2.86
7,213.88
7,132.82
371.61
46.40
5,959,732.185
599,500.542
1.96
7,300.74
7,219.68
405.07
36.85
5,959,765.512
599,490.557
0.51
7,386.87
7,305.81
437.48
27.78
5,959,797.798
599,481.057
0.59
7,475.69
7,394.63
472.24
18.67
5,959,832.434
599,471.484
2.00
7,560.38
7,479.32
506.84
9.88
5,959,866.906
599,462.239
0.26
7,648.95
7,567.89
542.64
0.70
5,959,902.583
599,452.591
0.21
7,732.42
7,651.36
576.93
-9.21
5,959,936.738
599,442.225
2.02
7,817.11
7,736.05
612.50
-20.51
5,959,972.148
599,430.454
0.16
7,905.80
7,824.74
648.55
-32.25
5,960,008.043
599,418.240
1.39
7,995.75
7,914.69
683.70
-44.14
5,960,043.025
599,405.891
0.22
8,086.33
8,005.27
718.55
-56.02
5,960,077.712
599,393.554
0.40
8,175.14
8,094.08
751.79
-67.46
5,960,110.791
599,381.670
0.70
8,254.64
8,173.58
780.98
-76.99
5,960,139.851
599,371.763
0.93
8,344.61
8,263.55
814.97
-86.79
5,960,173.709
599,361.513
1.23
8,431.47
8,350.41
849.64
-96.15
5,960,208.244
599,351.694
1.07
8,517.18
8,436.12
887.93
-106.25
5,960,246.392
599,341.089
3.89
8,599.29
8,518.23
931.45
-117.83
5,960,289.754
599,328.936
4.53
8,654.30
8,573.24
965.03
-127.43
5,960,323.204
599,318.895
4.91
8,706.87
8,625.81
999.51
-137.53
5,960,357.544
599,308.335
1.32
8,715.58
8,634.52
- 1,005.33
-139.20
5,960,363.342
599,306.590
1.32
V. Sec
(usft) '
-44.62
-48.85
-59.86
-75.13
-96.47
-120.25
-145.62
-170.62
-194.68
-219.95
-244.86
-270.71
-296.44
-324.01
-352.21
-380.08
-407.79
-434.32
-457.16
-482.65
-508.09
-535.98
-567.77
-592.87
-618.86
-623.22
11/1/2016 1:23.32PM Page 6 COMPASS 5000.1 Build 81B
2+�►+tiSBP riFag
100#e
_by Final Survey Report BAKER
'���' HUGHES
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well Z-23
Project: Prudhoe Bay
TVD Reference:
Z -23B @ 81.06usft (Doyon 16)
Site: PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Well: Z-23
North Reference:
True
Wellbore: Z -23C
Survey Calculation Method:
Minimum Curvature
Design: Z -23C
Database:
EDM R5K-Alaska PROD -ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
8,954.57
39.13
344.30
8,740.30
8,659.24
1,023.25
-144.28
5,960,381.194
599,301.275
13.77
-636.58
8,985.11
43.40
344.54
8,763.25
8,682.19
1,042.65
-149.69
5,960,400.518
599,295.613
13.99
-650.96
9,017.29
47.60
346.11
8,785.80
8,704.74
1,064.85
-155.49
5,960,422.637
599,289.518
13.51
-667.081
9,047.03
48.27
345.35
8,805.72
8,724.66
1,086.25
-160.93
5,960,443.958
599,283.793
2.95
682.491
9,078.35
49.18
342.64
8,826.39
8,745.33
1,108.87
-167.42
5,960,466.489
599,277.002
7.12
-699.431
9,110.77
53.62
339.92
8,846.61
8,765.55
1,132.85
-175.57
5,960,490.358
599,268.540
15.18
-718.47
9,141.88
58.29
338.69
8,864.02
8,782.96
1,156.96
-184.68
5,960,514.337
599,259.109
15.36
-738.42
9,172.00
62.41
333.74
8,878.93
8,797.87
1,180.88
-195.25
5,960,538.120
599,248.223
19.77
-759.54
9,205.78
66.53
331.48
8,893.48
8,812.42
1,207.93
-209.28
5,960,564.981
599,233.840
13.61
-785.21
9,235.75
70.17
330.51
8,904.54
8,823.48
1,232.29
-222.79
5,960,589.154
599,220.013
12.51
-809.09
9,263.64
73.99
328.98
8,913.12
8,832.06
1,255.21
-236.16
5,960,611.889
599,206.341
14.66
-832.12
T►P
9,279.00
76.57
328.44
8,917.02
8,835.96
1,267.90
-243.88
5,960,624.478
599,198.459
17.14
-845.15
KOPITop of Whipstock
9,300.01
80.09
323.24
8,921.27
8,840.21
1,284.91
-255.43
5,960,641.336
599,186.684
29.46
-863.66
Interpolated Azimuth
9,330.47
86.56
315.82
8,924.82
8,843.76
1,307.89
-275.05
5,960,664.050
599,166.762
32.19
-892.14
Interpolated Azimuth
9,360.24
86.37
308.68
8,926.66
8,845.60
1,327.86
-297.03
5,960,683.721
599,144.521
23.95
-921.16
Interpolated Azimuth
9,390.89
86.96
301.41
8,928.44
8,847.38
1,345.41
-322.06
5,960,700.945
599,119.259
23.76
951.621
9,421.10
83.75
291.53
8,930.89
8,849.83
1,358.82
-348.98
5,960,713.994
599,092.172
34.28
981.63
9,448.67
80.96
280.40
8,934.57
8,853.51
1,366.33
-375.20
5,960,721.157
599,065.854
41.27
-1,008.10
9,480.31
83.28
269.63
8,938.92
8,857.86
1,369.06
-406.37
5,960,723.471
599,034.652
34.50
-1,036.46
9,510.47
83.60
256.75
8,942.38
8,861.32
1,365.51
-436.06
5,960,719.532
599,005.017
42.44
-1,060.40
9,540.49
83.13
245.31
8,945.86
8,864.80
1,355.84
-464.21
5,960,709.486
598,976.998
37.88
-1,079.94
9,570.63
84.55
234.18
8,949.11
8,868.05
1,340.76
-490.05
5,960,694.070
598,951.362
37.01
-1,094.78
9,606.75
82.79
218.52
8,953.11
8,872.05
1,316.07
-515.95
5,960,669.037
598,925.796
43.36
-1,104.86
11/1/2016 1:23:32PM
Page 7
COMPASS 5000.1 Build 81B
2 sbpBPVeA
100wFinal
Inc
Survey Report
Azi (azimuth)
••
TVD
TVDSS
NIS
BAKER
E/W
Northing
Easting
HUGHES
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well Z-23
Project:
Site:
Prudhoe Bay
PB Z Pad
TVD Reference:
Z-23B @ 81.06usft (Doyon 16)
(usft)
Well:
Z-23
MD Reference:
Z-23B @ 81.06usft (Doyon 16)
(usft)
Wellbore:
Z-23C
North Reference:
True
9,637.44
84.38
Survey Calculation Method:
Minimum Curvature
8,956.55
Design:
Z-23C
Database:
EDM R5K- Alaska PROD -ANCP1
-532.92
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft) 1
9,637.44
84.38
209.23
8,956.55
8,875.49
1,290.77
-532.92
5,960,643.523
598,909.157
30.52
-1,106.91
9,667.19
85.14
205.02
8,959.27
8,878.21
1,264.41
-546.43
5,960,616.988
598,896.005
14.32
1,105.43
9,697.41
83.79
202.57
8,962.18
8,881.12
1,236.89
-558.56
5,960,589.313
598,884.236
9.22
-1,102.18
9,727.37
82.78
197.38
8,965.69
8,884.63
1,208.94
-568.73
5,960,561.230
598,874.446
17.53
-1,097.00
9,757.97
83.81
192.60
8,969.26
8,888.20
1,179.59
-576.58
5,960,531.783
598,866.979
15.87
-1,089.13
9,790.51
84.77
189.26
8,972.50
8,891.44
1,147.81
-582.72
5,960,499.921
598,861.263
10.63
-1,078.55
9,817.41
86.92
186.62
8,974.45
8,893.39
1,121.24
-586.42
5,960,473.308
598,857.910
12.64
-1,068.48
9,850.61
87.64
182.62
8,976.03
8,894.97
1,088.19
-589.10
5,960,440.231
598,855.678
12.23
-1,054.27
9,884.90
85.82
175.92
8,977.98
8,896.92
1,053.98
-588.66
5,960,406.032
598,856.565
20.22
1,036.78
9,916.13
87.94
172.46
8,979.69
8,898.63
1,022.96
-585.50
5,960,375.063
598,860.131
12.98
-1,018.54
9,940.23
87.91
169.30
8,980.56
8,899.50
999.19
-581.69
5,960,351.341
598,864.262
13.10
-1,003.35
9,970.39
88.99
165.85
8,981.37
8,900.31
969.75
-575.20
5,960,321.994
598,871.137
11.98
-983.01
9,998.33
87.73
161.86
8,982.17
8,901.11
942.93
-567.44
5,960,295.280
598,879.254
14.97
-962.88
10,030.30
87.63
157.84
8,983.47
8,902.41
912.94
-556.44
5,960,265.449
598,890.651
12.57
-938.36
10,060.35
87.69
155.41
8,984.70
8,903.64
885.38
-544.52
5,960,238.052
598,902.925
8.08
-914.261
10,092.43
86.37
151.15
8,986.36
8,905.30
856.78
-530.12
5,960,209.639
598,917.702
13.88
-887.49
10,121.32
86.50
147.37
8,988.16
8,907.10
832.00
-515.39
5,960,185.060
598,932.763
13.07
-862.34
10,149.57
87.70
143.19
8,989.59
8,908.53
808.81
-499.32
5,960,162.093
598,949.133
15.38
-836.83
10,180.01
89.11
140.16
8,990.43
8,909.37
784.95
-480.45
5,960,138.479
598,968.312
10.98
-808.56
10,214.26
89.32
137.48
8,990.90
8,909.84
759.17
-457.91
5,960,113.009
598,991.196
7.85
-776.15
1 10,240.81
88.68
134.57
8,991.37
8,910.31
740.07
-439.48
5,960,094.154
599,009.876
11.22
-750.63
10,269.97
90.37
131.15
8,991.61
8,910.55
720.24
418.11
5,960,074.610
599,031.504
13.08
-722.21
10,300.97
88.59
128.15
8,991.89
8,910.83
700.46
-394.24
5,960,055.152
599,055.626
11.25
691.66
10,329.57
91.60
126.01
8,991.84
8,910.78
683.22
-371.43
5,960,038.217
599,078.663
12.91
-663.28
10,360.99
91.75
122.83
8,990.92
8,909.86
665.47
-345.53
5,960,020.812
599,104.798
10.13
-631.97
10,395.40
92.09
120.07
8,989.77
8,908.71
647.53
-316.19
5,960,003.262
599,134.366
8.08
-597.59
10,421.35
92.58
- 117.79
8,988.71
8,907.65
634.99
-293.50
5,959,991.022
599,157.219
8.98
-571.67
11/1/2016 1:23:32PM
Page 8
COMPASS
5000.1 Build 81B
by BP riles
�0 Final Survey Report BAKER
HUGHES
Company: North America - ALASKA - BP
Project: Prudhoe Bay
Local Coordinate Reference:
Well Z-23
Site: Z Pad
ND Reference:
Z-238 81.06usft (Doyon 16)
@ ( Y
Z-
Well: Z-23
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Wellbore: Z -23C
North Reference:
True
Design: Z -23C
Survey Calculation
Method:
Minimum Curvature
Database:
EDM R5K-Alaska PROD -ANCP1
Survey
MD Inc
(usft) (°)
Azi (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
10,450.53
93.28
115.54
8,987.22
8,906.16
621.91
-267.46
5,959,978.292
599,183.428
8.07
-542.58
10,479.88
92.76
111.16
8,985.67
8,904.61
610.30
-240.56
5,959,967.036
599,210.479
15.01
-513.48
10,515.49
93.69
111.83
8,983.67
8,902.61
597.27
-207.48
5,959,954.449
599,243.726
3.22
-478.32
10,541.53
93.17
114.93
8,982.11
8,901.05
586.96
-183.62
5,959,944.453
599,267.714
12.05
-452.50
10,580.06
94.30
120.01
8,979.60
8,898.54
569.23
-149.52
5,959,927.179
599,302.045
13.48
-414.10
10,610.75
95.04
125.00
8,977.10
8,896.04
552.80
-123.73
5,959,911.092
599,328.046
16.38
-383.55
10,640.39
93.75
128.48
8,974.83
8,893.77
535.12
-100.05
5,959,893.733
599,351.953
12.49
-354.21
10,669.73
93.68
133.19
8,972.93
8,891.87
515.98
-77.91
5,959,874.890
599,374.348
16.02
-325.46
10,700.75
90.21
135.83
8,971.87
8,890.81
494.25
-55.80
5,959,853.458
599,396.735
14.05
-295.45
10,730.21
88.40
140.37
8,972.23
8,891.17
472.33
-36.14
5,959,831.803
599,416.688
16.59
-267.46
10,759.99
88.74
139.47
8,972.97
8,891.91
449.56
-16.97
5,959,809.282
599,436.154
3.23
-239.47
10,790.07
90.92
137.00
8,973.06
8,892.00
427.12
3.06
5,959,787.118
599,456.480
10.95
-210.91
10,815.35
90.86
134.64
8,972.67
8,891.61
409.00
20.68
5,959,769.228
599,474.332
9.34
-186.59
10,846.91
90.46
132.03
8,972.31
8,891.25
387.34
43.63
5,959,747.880
599,497.566
8.37
-155.89
10,876.57
89.51
128.01
8,972.31
8,891.25
368.27
66.34
5,959,729.116
599,520.524
13.93
-126.69
10,905.78
91.08
125.48
8,972.16
8,891.10
350.80
89.74
5,959,711.955
599,544.154
10.19
-97.68
10,936.97
90.64
122.36
8,971.70
8,890.64
333.40
115.62
5,959,694.900
599,570.256
10.10
-66.571
10,966.62
92.21
120.33
8,970.96
8,889.90
317.98
140.93
5,959,679.820
599,595.768
8.65
-36.94
10,995.40
93.38
119.16
8,969.56
8,888.50
303.72
165.89
5,959,665.891
599,620.909
5,75
-8.20
11,025.11
93.60
116.10
8,967.75
8,886.69
289.97
192.16
5,959,652.490
599,647.357
10.31
21.43
11,055.99
95.29
112.24
8,965.35
8,884.29
277.36
220.24
5,959,640.260
599,675.600
13.61
52.051
11,085.85
93.17
109.83
8,963.15
8,882.09
266.68
248.03
5,959,629.943
599,703.527
10.73
81.46
11,115.92
92.40
106.09
8,961.69
8,880.63
257.42
276.60
5,959,621.064
599,732.210
12.68
110.83
11,145.77
93.44
101.21
8,960.17
8,879.11
250.39
305.56
5,959,614.415
599,761.258
16.69
139.43
11,175.73
93.23
97.34
8,958.42
8,877.36
245.57
335.07
5,959,609.987
599,790.829
12.91
167.39
11,212.70
11,256.11
93.87
91.60
92.41
86.45
8,956.13
8,875.07
242.43
371.82
5,959,607.338
599,827.618
13.42
200.791
8,954.06
8,873.00
242.86
415.16
5,959,608.345
599,870.941
14.68
238.11
11/1/2016 1:23:32PM
Page 9
COMPASS
5000.1 Build 818
s by
Company: North America - ALASKA - BP
Project: Prudhoe Bay
Site: PB Z Pad
Well: Z-23
Wellbore: Z -23C
Design: Z -23C
Survey
MD Inc
(usft) V)
11,280.61
91.94
11,310.35
92.09
11,340.33
90.89
11,372.01
90.31
11,402.73
89.97
11,431.51
89.32
11,460.51
88.10
11,491.21
87.94
11,520.85
86.77
11,551.91
88.68
11,580.69
88.13
11,610.53
88.44
11,638.17
85.39
11, 670.81
85.20
11, 700.91
84.80
11,730.35
85.91
11,766.97
85.42
11,796.17
83.14
11,823.83
85.20
11,847.63
85.24
11,865.39
84.68
11,927.00
84.68
Projection to TD - 2-718"
BP
Final Survey Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well Z-23
Z -23B @ 81.06usft (Doyon 16)
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
rias
BAKER
HUGHES
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
('1100usft)
(usft)
82.89
8,953.30
8,872.24
245.14
439.54
5,959,610.941
599,895.285
14.59
258.08
77.31
8,952.26
8,871.20
250.25
468.80
5,959,616.436
599,924.480
18.76
280.87
71.92
8,951.48
8,870.42
258.19
497.69
5,959,624.765
599,953.254
18.41
301.91
66.83
8,951.14
8,870.08
269.35
527.33
5,959,636.310
599,982.739
16.17
322.00
64.02
8,951.07
8,870.01
282.12
555.26
5,959,649.452
600,010.500
9.21
339.81
67.50
8,951.25
8,870.19
293.94
581.50
5,959,661.611
600,036.576
12.30
356.62
72.38
8,951.90
8,870.84
303.88
608.72
5,959,671.912
600,063.665
17.34
375.23
77.53
8,952.96
8,871.90
311.84
638.34
5,959,680.264
600,093.174
16.77
396.90
81.83
8,954.33
8,873.27
317.14
667.47
5,959,685.952
600,122.221
15.02
419.471
86.28
8,955.56
8,874.50
320.36
698.33
5,959,689.572
600,153.033
15.58
444.59
90.30
8,956.36
8,875.30
321.22
727.08
5,959,690.811
600,181.766
14.09
469.06
94.55
8,957.26
8,876.20
319.95
756.87
5,959,689.944
600,211.571
14.27
495.49
97.65
8,958.75
8,877.69
317.02
784.31
5,959,687.376
600,239.042
15.72
520.72
103.77
8,961.43
8,880.37
310.98
816.25
5,959,681.758
600,271.064
18.70
551.41
107.02
8,964.05
8,882.99
303.02
845.16
5,959,674.183
600,300.070
10.84
580.42
113.70
8,966.44
8,885.38
292.82
872.65
5,959,664.344
600,327.693
22.93
609.33
119.27
8,969.21
8,888.15
276.54
905.32
5,959,648.502
600,360.573
15.23
645.76
124.59
8,972.12
8,891.06
261.18
929.97
5,959,633.473
600,385.421
19.74
674.79
127.49
8,974.93
8,893.87
244.99
952.22
5,959,617.583
600,407.878
12.82
702.151
130.32
8,976.91
8,895.85
230.10
970.67
5,959,602.936
600,426.526
11.85
725.58
129.10
8,978.47
8,897.41
218.80
984.28
5,959,591.815
600,440.283
7.53
743.01
129.10
8,984.19
8,903.13
180.11
1,031.89
5,959,553.763
600,488.393
0.00
803.591
11/1/2016 1:23:32PM Page 10 COMPASS 5000.1 Build 81B
BP
Final Survey Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Casing
Hole
Diameter
Diameter
Name (in)
(in)
2.875
4.250
Company:
North America - ALASKA- BP
Project:
Prudhoe Bay
Site:
PB Z Pad
Well:
Z-23
Wellbore:
Z -23C
Design:
Z -23C
Casing Points
1,255.21
-236.16
Measured Vertical
9,279.00
Depth Depth
1,267.90
(usft) (usft)
KOP/Top of Whipstock
11, 927.00 2-7/8"
BP
Final Survey Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Casing
Hole
Diameter
Diameter
Name (in)
(in)
2.875
4.250
Well Z-23
Z -23B @ 81.06usft (Doyon 16)
Z-238 @ 81.06usft (Doyon 16)
True
Minimum Curvature
EDM R5K-Alaska PROD -ANCPi
EPA .9
BAKER
HUGHES
Design Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+NI -S
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
9,263.64
8,913.12
1,255.21
-236.16
TIP
9,279.00
8,917.02
1,267.90
-243.88
KOP/Top of Whipstock
9,300.01
8,921.27
1,284.91
-255.43
Interpolated Azimuth
9,330.47
8,924.82
1,307.89
-275.05
Interpolated Azimuth
9,360.24
8,926.66
1,327.86
-297.03
Interpolated Azimuth
11,927.00
8,984.19
180.11
1,031.89
Projection to TD
Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes
11/1/2016 1:23:32PM Page 11 COMPASS 5000.1 Build 81B
Pro ct: PrudhmB Tn1N01tl` WELLBORE DETAILS: Z -23C REFERENCE X ay rn.o,.ec ruenn:le.oe i
Site: PBZPad Coamnah r'..
Weg: Z-23 Mop�b Z -23C (NIE)Rehrence: Well Z-23, True Nc
Seerytli5)5509vi VeNcaIIND)Reference'. Z-23B@p1.06usfllDoyou16) BAKER
We6bore: Z -23C oyMph: eoa 5ecfpn (VB)Rehrerce: Sbt(0.00N, 0.00E)
Design: Z•23C �Z-23IZ•23C) ome: wlrzol Parent Wellbore: Z -23B Measured Depth Reference: Z-23B@81,06usfllDoyon 16) HUGHES
MvOd B('i3.401 Tie on MD: 9263.64 CakuhOon M.p Mnimum Curvaure
e
Easfing (85 usft/in)
N N N N N N N N N N N N N N N N N N N N N U N N N N O) 0m N m 0) N O) N m 0)
O O O O O O O O O O O N 10 U) O r0 r0 fD r0 O N O r0 UJ O O O O O O O O O O O O O
V m m m N m N m N N m N m U) tp O r0 r0
0 �O O ,
NV A� W0 0 b O 0 0 O O O
W-
�--OOo OO
O N O N O N O O WA N N N m O OO O) ONN OA NN O N0 NN ON W
J% - , N
Z -j1 5960660 Z�1r�L16i1 Z11 26IZ Z1O
596066019/ 1Z 136 23 Z Z -61L 1022 02OO\ZZb9/Z- 9
5960795 Z- a17.(4t
� 23 5960795 1Z
5960710 5960710
196.25
�I
o
..'5 ✓ �� -'—rte I_. �L_ __.. b 7f� 5960625
„� Z - 16/Z 118
5960540 f I,. _
i - -
/14fi 5960540
4)
i.
LI 4 j - ,
j 5960455 - - - - -�. Z a
q{
_ � - _ _.. ,. / i ' f 5960455
�
000
C' p Z-1001 -?
5960370 — - " -`� \ ' r- - _. --t _11$[Z T 5AF�B�
Z-11Z-15APE31 5960370
6
5960285
Z-1 5/Z-1 SA 5960285
S5%0200 -- -- - ' --� ..'. -- �Q 6
� -t --b=, - - � - 5960200 �
5960115 n Kz'j
- I_ _ 6 (2 30)I v6/Pan Z 106
w 1 1 I
-- � � u
v5960115
ao �
0
- — -- - B Y
... - i C i - - -�2-210 5960030=
5959945
ss6003o, �., _\ iii --- -�-y� , l -- --- i -o:'' -�- - 9999949
Z 21D/Z-210P1B1
5959860 C
Z 5969860 t f�2,w C L,
O T
5959775 - I -
5859775
5959690 - q _
Z
-- - 4 40 5959690
5959605
I I
'5959605
5959520��� 6959520
r
5A� o
5959435 w _ Z-2 /Z-2 C— Z`201Z-20�-
0
5959350 Z 05! .._ ! _- . - _ ._I.' I ��, / '�1�/7- 1$ PB� ssssa35
�- T _
sba 4
.x5959350
5959265 2 P B8
..-_
. ..5959265
23/Z23AL1X reports do not elet9- Q , 5959095 59l 7 IE
ff 03ZZ-59180
Z, 3
59590ZJBrL
0 um00 0 0 0w00 O0o0000w m m m mm m o 0
O A A om o
O ON W A N 0 OO N O O N N WO NmNz-z3e stosNst(Doyon1s) OO O O N O Vi O
I
Easting (85 usft/in)
AOc`MC OFFE3E r DEPORT
North America - ALASKA - BP
Prudhoe Bay
PB Z Pad
Z-23
Z -23C
Z -23C
AOGCC Post Drilling Offset Report
01 November, 2016
BAKER
HUGHES
/BOO GCC OFFSET REPORT
.0*0 BP F/. FAa
Z p Anticollision Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00usft
Reference Well:
Z-23
Well Error:
0.00usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well Z-23
Z -23B @ 81.06usft (Doyon 16)
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
Z -23C
Filter type:
NO GLOBAL FILTER: Using user defined selection & filtering criteria
Interpolation Method:
MD Interval 25.00usft Error Model: ISCWSA
Depth Range:
Unlimited Scan Method: Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic
AAOOZGTC�OOFFSET REPORT
Survey Program
Date 11/1/2016
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
100.02
4,000.02 Z -23A Srvy 1 GYD-GC MS (Z-23PB1)
GYD-GC-MS
Gyrodata gyrocompassing m/s
4,100.02
6,700.02 Z -23A Srvy 1 GYD-GC MS (Z-23)
GYD-GC-MS
Gyrodata gyrocompassing m/s
6,718.00
6,748.00 Z -23B Srvy 1 Inc+Trend (Z -23B)
INC+TREND
Inclinometer+ known azi trend
6,809.92
9,263.64 Z -23B Srvy 2 MWD+IFR+MS (Z -23B)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
9,279.00
11,865.39 BHI MWD CTK4-1/4" (Z -23C)
MWD
MWD - Standard
11/1/2016 1.31:10PM
Page 2 of 6
COMPASS 5000.1 Build 81B
AAOOZGTC�OOFFSET REPORT
BP
Fel
Z� p Anticollision Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well Z-23
Project:
Prudhoe Bay
ND Reference:
Z -23B @ 81.06usft (Doyon 16)
Reference Site:
PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Site Error:
O.00usft
North Reference:
True
Reference Well:
Z-23
Survey Calculation Method:
Minimum Curvature
Well Error:
O.00usft
Output errors are at
1.00 sigma
Reference Wellbore
Z -23C
Database:
EDM R5K - Alaska PROD - ANCP1
Reference Design:
Z -23C
Offset ND Reference:
Offset Datum
Summary
Reference
offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
PB Z Pad
Plan Kup Z-105 (SD) v6.2 - Plan Z-105 - Plan #7 Z
729.70
750.00
492.53
12.04
480.49
Pass - Major Risk
Plan Kup Z-105 (SD) v6.2 - Plan Z-105PB1 - Plan
729.70
750.00
492.53
12.04
480.49
Pass - Major Risk
Plan Kup Z-106 (27+30) v6 - Plan Z-106 - Plan #4
2,000.46
2,075.00
98.42
30.10
68.36
Pass - Major Risk
Plan Kup Z-111 (29.5) v6 - Plan Z-111 - Plan #10 Z
696.49
700.00
399.16
12.31
386.87
Pass - Major Risk
Plan Sch Z-203 (NB) v6.2 - Plan Z-203 - Plan #5 Z
1,015.93
1,050.00
402.33
17.81
384.51
Pass - Major Risk
Z-01 - Z-01 - Z-01
2,714.63
2,725.00
364.20
39.75
324.45
Pass - Major Risk
Z-01 - Z-01 A - Z-01 A
2,714.63
2,725.00
364.20
39.75
324.45
Pass - Major Risk
Z-01 - Z-01APB1 - Z-01APB1
2,714.63
2,725.00
364.20
39.75
324.45
Pass - Major Risk
Z-01 - Z-01AP62 - Z-01APB2
2,714.63
2,725.00
364.20
39.75
324.45
Pass - Major Risk
Z-01 - Z-01 B - Z-01 B
2,714.63
2,725.00
364.20
39.75
324.45
Pass - Major Risk
Z-02 - Z-02 - Z-02
2,791.04
2,800.00
386.41
41.86
344.55
Pass - Major Risk
Z-02 - Z -02A - Z -02A
2,798.74
2,800.00
386.53
42.00
344.54
Pass - Major Risk
Z-03 - Z-03 - Z-03
723.45
725.00
396.48
11.29
385.20
Pass - Major Risk
Z-03 - Z -03A - Z -03A
723.45
725.00
396.48
11.29
385.20
Pass - Major Risk
Z-04 - Z-04 - Z-04
3,288.53
3,300.00
441.21
44.02
397.19
Pass - Major Risk
Z-04 - Z -04A - Z -04A
3,297.57
3,300.00
441.29
44.13
397.17
Pass - Major Risk
Z-05 - Z-05 - Z-05
3,015.88
3,025.00
467.38
43.16
424.22
Pass - Major Risk
Z-05 - Z -05A - Z -05A
3,015.88
3,025.00
467.38
43.08
424.31
Pass - Major Risk
Z-05 - Z-05APB1 - Z-05AP61
3,015.88
3,025.00
467.38
43.16
424.22
Pass - Major Risk
Z-06 - Z-06 - Z-06
1,607.11
1,625.00
488.24
22.51
465.73
Pass - Major Risk
Z-06 - Z -06A - Z -06A
1,610.25
1,625.00
488.28
22.55
465.73
Pass - Major Risk
Z-100 - Z-100 - Z-100
1,426.06
1,425.00
168.18
18.51
149.68
Pass - Major Risk
Z-101 - Z-101 - Z-101
1,037.60
1,050.00
176.91
18.99
157.92
Pass - Major Risk
Z-102 - Z-102 - Z-102
400.72
400.00
327.02
7.99
319.03
Pass - Major Risk
Z-102 - Z-102PB1 - Z-102PB1
400.72
400.00
327.02
8.14
318.88
Pass - Major Risk
Z-103 - Z-103 - Z-103
919.76
925.00
234.13
14.37
219.77
Pass - Major Risk
Z-103 - Z-103PB1 - Z-103PB1
919.76
925.00
234.13
14.37
219.77
Pass - Major Risk
Z-103 - Z-103PB2 - Z-103PB2
919.76
925.00
234.13
14.37
219.77
Pass - Major Risk
Z-108 - Plan Z-1 08A v5 - Plan #2 Z-1 08A
250.12
250.00
444.73
4.57
440.15
Pass - Major Risk
Z-108 - Plan Z-108APB1 v5 - Plan #2 Z-108APB1
250.12
250.00
444.73
4.57
440.15
Pass - Major Risk
Z-108 - Z-108 - Z-108
250.12
250.00
444.73
4.73
440.00
Pass - Major Risk
Z-108 - Z-1 08A - Z-1 08A wp06
231.39
250.00
444.45
4.30
440.15
Pass - Major Risk
Z-11 - Z-11 - Z-11
2,617.03
2,625.00
269.46
38.20
231.26
Pass - Major Risk
Z-11 - Z -11A- Z-1 1A
2,617.03
2,625.00
269.46
38.20
231.26
Pass - Major Risk
Z-112 - Z-112 - Z-112
6,677.75
8,175.00
228.92
210.59
22.26
Pass - Major Risk
Z-112 - Z-112PB1 - Z-112PB1
6,780.14
8,050.00
345.86
82.80
281.16
Pass - Major Risk
Z-112 - Z-112PB2 - Z-112PB2
6,677.75
8,175.00
228.92
210.59
22.26
Pass - Major Risk
Z-114 - Z-114 - Plan #21 Z-114
3,349.08
3,375.00
279.19
48.93
230.40
Pass - Major Risk
Z-114 - Z-114 - Z-114
3,296.97
3,325.00
277.39
41.88
235.56
Pass - Major Risk
Z-115 - Z-115 - Z-115
835.56
850.00
490.89
13.81
477.09
Pass - Major Risk
Z-116 - Z-116 - Z-116
779.14
800.00
273.24
14.15
259.08
Pass - Major Risk
Z-116 - Z-116PB1 - Z-116PB1
779.14
800.00
273.24
14.15
259.08
Pass - Major Risk
Z-116 - Z-116PB2 - Z-116PB2
779.14
800.00
273.24
14.15
259.08
Pass - Major Risk
Z-118 - Z-118 - Plan #13b Z-118
1,089.67
1,125.00
203.48
18.25
185.23
Pass - Major Risk
Z-118 - Z-118 - Z-118
26.87
26.86
235.99
1.30
234.69
Pass - Major Risk
Z-12 - Z-12 - Z-12
3,215.16
3,225.00
261.52
47.92
213.61
Pass - Major Risk
Z-13 - Z-13 - Z-13
3,745.29
3,800.00
149.32
50.19
99.13
Pass - Major Risk
Z-13 - Z -13A- Z-1 3A
3,730.48
3,775.00
149.20
50.02
99.18
Pass - Major Risk
Z-13 - Z-13APB1 - Z-13APB1
3,730.48
3,775.00
149.20
50.02
99.18
Pass - Major Risk
Z-14 - Z-14 - Z-14
3,473.98
3,500.00
270.50
53.99
216.54
Pass - Major Risk
Z-14 - Z -14A - Z-1 4A
3,473.98
3,500.00
270.50
53.99
216.54
Pass - Major Risk
Z-14 - Z -14B - Z -14B
3,482.83
3,500.00
270.61
54.13
216.51
Pass - Major Risk
Z-15 - Z-15 - Z-15
1,782.49
1,800.00
295.06
29.91
265.16
Pass - Major Risk
11/1/2016 1:31: IOPM Page 3 of 6 COMPASS 5000.1 Build 818
AO OCC OFFSET REPORT
,.N BP
sbp
Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well Z-23
Project:
Prudhoe Bay
ND Reference:
Z -23B @ 81.06usft (Doyon 16)
Reference Site:
PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Site Error:
O.00usft
North Reference:
True
Reference Well:
Z-23
Survey Calculation Method:
Minimum Curvature
Well Error:
O.00usft
Output errors are at
1.00 sigma
Reference Wellbore
Z -23C
Database:
EDM R5K - Alaska PROD - ANCP1
Reference Design:
Z -23C
Offset ND Reference:
Offset Datum
//%.
BAKER
HUGHES
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
PB Z Pad
Z-15 - Z -15A - Z -15A
1,782.49
1,800.00
295.06
29.91
265.16
Pass - Major Risk
Z-15 - Z-15APB1 - Z-15APB1
1,782.49
1,800.00
295.06
29.91
265.16
Pass - Major Risk
Z-15 - Z-15AP62 - Z-15APB2
1,782.49
1,800.00
295.06
29.91
265.16
Pass - Major Risk
Z-16 - Z-16 - Z-16
544.32
550.00
326.77
10.96
315.81
Pass - Major Risk
Z-16 - Z-1 6A - Z-1 6A
544.32
550.00
326.77
10.96
315.81
Pass - Major Risk
Z-17 - Z-17 - Z-17
1,517.48
1,525.00
346.78
23.55
323.23
Pass - Major Risk
Z-17 - Z -17A - Z-1 7A
1,517.48
1,525.00
346.78
23.55
323.23
Pass - Major Risk
Z-17 - Z-17APB1 - Z-17APB1
1,517.48
1,525.00
346.78
23.55
323.23
Pass - Major Risk
Z-18 - Plan Z-1 BA - Plan #1 Z-1 8A
681.84
700.00
368.68
11.27
357.41
Pass - Major Risk
Z-18 - Z-18 - Z-18
666.05
675.00
368.49
11.08
357.41
Pass - Major Risk
Z-19 - Z-19 - Z-19
1,577.13
1,625.00
309.34
37.04
272.31
Pass - Major Risk
Z-19 - Z-1 9A - Z-1 9A
1,581.13
1,625.00
309.46
37.15
272.32
Pass - Major Risk
Z-20 - Z-20 - Z-20
2,817.60
2,825.00
401.01
41.53
359.49
Pass - Major Risk
Z-21 - Z-21 - Z-21
2,713.78
2,725.00
85.23
40.19
45.06
Pass - Major Risk
Z-21 - Z -21A - Z -21A
2,720.51
2,725.00
85.30
40.21
45.11
Pass - Major Risk
Z-210 - Z-210 - Z-210
1,521.27
1,600.00
218.46
26.19
192.31
Pass - Major Risk
Z-210 - Z-210PB1 - Z-210PB1
1,521.27
1,600.00
218.46
26.19
192.31
Pass - Major Risk
Z-22 - Z-22 - Z-22
839.22
850.00
35.04
12.66
22.38
Pass - Major Risk
Z-22 - Z -22A - Z -22A
841.15
850.00
35.08
12.70
22.38
Pass - Major Risk
Z-22 - Z -22B - Z -22B
846.62
850.00
35.21
12.83
22.38
Pass - Major Risk
Z-23 - Z-23 - Z-23
7,011.05
7,025.00
26.29
28.83
-2.52
FAIL - Major Risk
Z-23 - Z -23A- Z -23A
7,021.43
7,025.00
27.81
28.97
-1.12
FAIL- Major Risk
Z-23 - Z-23ALIXX ( has reports do not delete) - Z
25.70
25.70
0.00
1.29
-1.29
FAIL - Major Risk
Z-23 - Z-236 - Z -23B
9,575.00
9,825.00
292.52
16.41
277.79
Pass - Major Risk
Z-23 - Z-23PB1 - Z-23PB1
5,789.34
5,800.00
19.34
36.30
-16.89
FAIL- Major Risk
Z-24 - Z-24 - Z-24
3,014.44
3,025.00
16.44
41.73
-25.28
FAIL - Major Risk
Z-25 - Z-25 - Z-25
3,039.37
3,050.00
57.71
45.38
12.35
Pass - Major Risk
Z-26 - Z-26 - Z-26
2,791.90
2,800.00
80.72
40.39
40.34
Pass - Major Risk
Z-26 - Z -26A - Z -26A
2,791.90
2,800.00
80.72
40.39
40.34
Pass - Major Risk
Z-27 - Z-27 - Z-27
1,288.03
1,300.00
315.42
20.72
294.70
Pass - Major Risk
Z-28 - Z-28 - Z-28
3,236.18
3,250.00
363.62
45.02
318.60
Pass - Major Risk
Z-29 - Z-29 - Z-29
1,583.31
1,600.00
381.43
23.48
357.95
Pass - Major Risk
Z-30 - Z-30 - Z-30
1,191.45
1,200.00
413.83
18.28
395.55
Pass - Major Risk
Z-30 - Z -30A - Z -30A
1,200.50
1,200.00
414.01
18.47
395.54
Pass - Major Risk
Z -31 -Z -31-Z-31
1,360.63
1,375.00
448.41
25.82
422.59
Pass - Major Risk
Z-32 - Z-32 - Z-32
1,630.33
1,650.00
488.90
25.05
463.85
Pass - Major Risk
Z-32 - Z -32A - Z -32A
1,631.06
1,650.00
488.91
25.06
463.85
Pass - Major Risk
Z-32 - Z -32B - Z -32B
1,612.07
1,625.00
488.66
24.81
463.85
Pass - Major Risk
Z-32-Z-32BL1-Z-32BL1
1,612.07
1,625.00
488.66
24.81
463.85
Pass - Major Risk
Z-32 - Z-32BPB1 - Z-32BPB1
1,612.07
1,625.00
488.66
24.81
463.85
Pass - Major Risk
Z-32 - Z-32BPB2 - Z-32BPB2
1,612.07
1,625.00
488.66
24.81
463.85
Pass - Major Risk
Z-32 - Z -32C - Plan #7b Z -32C apprved
1,621.66
1,650.00
488.78
24.97
463.81
Pass - Major Risk
Z-32 - Z -32C - Z -32C
1,620.61
1,650.00
488.77
24.96
463.81
Pass - Major Risk
Z-33 - Z -33A - Z -33A
4,937.12
4,950.00
447.43
51.25
396.18
Pass - Major Risk
Z-39 - Z-39 - Z-39
420.86
425.00
260.43
6.74
253.68
Pass - Major Risk
Z-39 - Z -39A - Z -39A
420.86
425.00
260.43
6.75
253.68
Pass - Major Risk
Z-46 - Z-46 - Z-46
197.43
200.00
381.73
3.69
378.04
Pass - Major Risk
Z-46 - Z -46A - Z -46A
197.43
200.00
381.73
3.69
378.04
Pass - Major Risk
Z-50 - Z-50 - Plan #8 Z-50 v6
1,167.14
1,175.00
453.92
16.86
437.07
Pass - Major Risk
Z-50 - Z-50 - Z-50
667.82
675.00
445.91
10.60
435.31
Pass - Major Risk
Z -504A - Z -504A - Z -504A
123.61
125.00
220.97
3.98
216.99
Pass - Major Risk
Z -504B - Z-5048 - Z -504B
123.54
125.00
190.95
3.98
186.97
Pass - Major Risk
Z-61 - Z-61 - Z-61
957.33
975.00
479.02
24.77
454.24
Pass - Major Risk
11/1/2016 1:31: IOPM Page 4 of 6 COMPASS 5000.1 Build 81B
A0(3CC Co F F S E T IFRIEP 0 RT
by
+4$
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0 OOusft
Reference Well:
Z-23
Well Error:
0-00usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C
BP
Anticollision Report
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Well Z-23
Z -23B @ 81.06usft (Doyon 16)
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
rihI
BAKER
HUGHES
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
PB Z Pad
Z-61 - Z-61 PB1 - Z-61 PB1
957.33
975.00
479.02
24.77
454.24
Pass - Major Risk
Z-66 - Z-66 - Z-66
1,791.75
1,875.00
444.32
28.67
415.89
Pass - Major Risk
Z-66 - Z-66PB1 - Z-66PB1
1,876.56
1,975.00
441.21
31.50
410.32
Pass - Major Risk
Z-69 - Z-69 - Z-69
4,842.73
5,200.00
374.81
54.30
321.10
Pass - Major Risk
Z-70 - Z-70 - Z-70
2,159.69
2,325.00
490.40
35.98
454.92
Pass - Major Risk
11/1/2016 1,31. IOPM Page 5 of 6 COMPASS 5000.1 Build 81B
Ak5iCC 0FR'3ET 'R-`Ep0 RT
b BP //.k2
00+J
,�' p Anticollision Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
O.00usft
Reference Well:
Z-23
Well Error:
O.00usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well Z-23
Z -23B @ 81.06usft (Doyon 16)
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
reference Depths are relative to Z -23B @ 81.06usft (Doyon 16) Coordinates are relative to: Z-23
)ffset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04
ventral Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 0.76°
I,
:03) 450
C
O
12
CU
CL
un 300-
2
c
a)
2, Plan2005,Plai
2, 31anZ4?05PB1,
PlanF-106, PI;
� 5[1
i, IanZ�111,P1'an
2, 31an Z-203, Plai
V6
V5
VO
Ladder.Plot
0-
0
2000 $ Z-13,Z-4*6-13AV2 6000 8(0
�- Z-13,Z-13APB1,Ae&Wbepth (2000 usfffin)
$ Z -14,Z -14,Z -14V1
Z-14, Z-14 B, Z -14B V9
$ Z -15,Z -15,Z -15V1
-- Z-15,Z-15A,Z-15AV0
-�
Z-1 5,Z-1 5APB1, Z-1 5APB1 VO
- Z-15,Z-15APB2,Z-15APB2V0
-�- Z -16,Z -16,Z -16V7
- Z-16,Z-16A,Z-16AV0
-k}-
Z-1 7, Z-1 7, Z-1 7 V1
$ Z-17,Z-17A,Z-17AV0
-" An Z -30,Z-30 V7 )
12000
$ Z-30, Z -30A, Z -30A V9
$ Z -31,Z -31,Z-31 V1
$ Z-32,Z-32A,Z-32AV0
$ Z-32,Z-32B,Z-32B VO
-Xf Z-32,Z-32BL1,Z-32BL1 VO
-#� Z-32,Z-32BPB1,Z-32BP61 V0
$ Z32,Z-32BPB2,Z-32BPB2V0
. Z -32,Z -32C, Plan #7b Z -32C ar
Z-32, Z -32C, Z -32C V0
$ Z-33, Z -33A, Z -33A V 1
Z -39,Z -39,Z-39 V18
11/1/2016 1:31:1OPM Page 6 of 6 COMPASS 5000.1 Build 81B
AOOC�� OFFSET r`�%EpORT
`
E.�bn ZRO&%�'6
pro/
- r
.
Z- Z -25V1
si
-
0-
0
2000 $ Z-13,Z-4*6-13AV2 6000 8(0
�- Z-13,Z-13APB1,Ae&Wbepth (2000 usfffin)
$ Z -14,Z -14,Z -14V1
Z-14, Z-14 B, Z -14B V9
$ Z -15,Z -15,Z -15V1
-- Z-15,Z-15A,Z-15AV0
-�
Z-1 5,Z-1 5APB1, Z-1 5APB1 VO
- Z-15,Z-15APB2,Z-15APB2V0
-�- Z -16,Z -16,Z -16V7
- Z-16,Z-16A,Z-16AV0
-k}-
Z-1 7, Z-1 7, Z-1 7 V1
$ Z-17,Z-17A,Z-17AV0
-" An Z -30,Z-30 V7 )
12000
$ Z-30, Z -30A, Z -30A V9
$ Z -31,Z -31,Z-31 V1
$ Z-32,Z-32A,Z-32AV0
$ Z-32,Z-32B,Z-32B VO
-Xf Z-32,Z-32BL1,Z-32BL1 VO
-#� Z-32,Z-32BPB1,Z-32BP61 V0
$ Z32,Z-32BPB2,Z-32BPB2V0
. Z -32,Z -32C, Plan #7b Z -32C ar
Z-32, Z -32C, Z -32C V0
$ Z-33, Z -33A, Z -33A V 1
Z -39,Z -39,Z-39 V18
11/1/2016 1:31:1OPM Page 6 of 6 COMPASS 5000.1 Build 81B
AOOC�� OFFSET r`�%EpORT
Printed 11/16/2016 9:53:55AM
North America - ALASKA - BP
Page 1 of 2
-Z-23/
Cementing Report
Common Well Name: 05Report
no : 1 �eport date : 10/29/2016
Project Prudhoe Bay
Site: PB Z Pad
Spud Date/Time: 6/7/1989
Event Type: COM- ONSHORE (CON)
1 Start Date: 10/27/2016 End Date: 10/30/2016
AFE No.:
Contractor: NORDIC CALISTA
Rig Nam /No.: NORDIC 2 Rig Release: 10/30/2016 X3-017YD-C: (1,720,544.00 )
UWI: 500292195000
Active datum: Z -23B @81.06usft (above Mean Sea Level)
General Information
Job type: Primary
Cement job start date/time: 10/29/2016 1:OOAM
Job end date/time: 10/29/2016 4.00AM
Cement Company: SLB -CEMENTING
Cementer: JARED WALLACE/CHARLES
HACKER
Cemented String: PRODUCTION LINER 1
String Size: 2.875 (in)
String Set TMD: 11,553.00 (usft) Hole Size: 4.250 (in)
Pipe Movement
Pipe Movement: NO MOVEMENT
Rotating Time (Start -End):
RPM:
Rotating Torque (init/avg/max): (ft-lbf)
Reciprocating Time (Start -End):
Recip Drag Up/Down: - (kip)
SPM: Stroke Length:
Fluid Name: EXHAUST PILL
Fluids (1 of 1)
Slurry Type: CEMENT
Purpose: PRIMARY
Class:
G -CLASS Description:
TAIL SLURRY Density: 15.30 (ppg)
Yield: 1.6500 (ft'/sk)
Mix Water Ratio:
5.161 (gal/sk94) Excess:
Mix Method: ON -THE -FLY
Sacks Used: 96.00 (941b sacks)
Water Volume:
11.8 (bbl) Excess Slurry Volume:
0.0 (bbl) Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well:
25.0 (bbl) Slurry Volume:
28.2 (bbl) Excess Measured From: EST. GAUGE HOLE
Mud Type: KCL
Density:
8.40 (ppg) PV:
YP: Viscosity:
Gels 10 Sec:
Gels 10 Min:
Additives
Name
Type
Amount
Units
Concentration Unit
D178
SILICA
35.000
% BWOC
D047
ANTIFOAM AGENT
0.200
GAL/SX
D-65
DISPERSANTo
1.250
/o BWOC
D600 G
GAS -BLOCK
1.800
GAL/SX
D-167
FLUID LOSSo
0.150
/o BWOC
D800
RETARDER AID
0.600
%BWOC
Printed 11/16/2016 9:53:55AM
Printed 11/16/2016 9:53:55AM
North America -ALASKA - BP
Page 2 of 2
--- - -
-
Cementing Report
--------
Common Well Name: Z-23 3-/V5--
---
7 Reportno.: 1 Report date: 10129/2016
Project: Prudhoe Bay Y _
Site: PB Z Pad
Spud Date/Time: 6/7/1989
Event Type: COM- ONSHORE (CON)
Start Date: 10/27/2016 End Date: 10/30/2016
Rig Name/No.: NORDIC 2 Rig Release: 10/30/2016
AFE No.:
X3-017YD-C: (1,720,544.00)
Contractor: NORDIC CALISTA
UWI: 500292195000
Active datum: Z-2313@8L06usft (above Mean Sea Level)
Stages
Stage
Stage Type
Est. Top
Est. Bottom
Mud Circ.
Mud Circ.
Top
Bottom
Plug
Pressure
Float
Pressure
Returns
Circulate
Cmt Vol to
Total
Annular
no.
(usft)
(usft)
Rate
Press.
Plug
Plug
Bumped
Bumped
Held
Held
Prior
Surface
Mud Lost
Flow
(gpm)
(psi)
(psi)
(min)
(hr)
(bbl)
(bbl)
After
1
PRIMARY CEMENT
8,692.00
11,553.00
Y
N
Y
3,500.00
Y
Pumping Schedule
Fluid pumped
Volume
Avg.
Max Disp.
Slurry Top
Slurry Base
Start Mix Cmt
Start Slurry
Pumping end
Start Disp
Foam
Gas Type
Gas Vol
BH circ.
Bh static
Pumped
Disp.
Rate
TMD
TMD
Pmp
date/time
job
Used
temp.
temp.
(bbl)
Rate
(bbl/min)
(usft)
(usft)
(scf)
(bbl/min)
EXHAUST PILL - TAIL
28.0
3.10
8,692.00
11,553.00
N
SLURRY
Tests
Casing Test
Shoe Test
Liner Top Test
Test Pressure: (psi)
FIT/LOT:
(ppg)
Liner Overlap:
(usft)
Time: (min)
Tool:
N
Positive Test:
(ppg)
Positive Test Tool:
N
Cement Found between Shoe and Collar:
N
Open Hole Length: (usft)
Negative Test:
(ppg)
Negative Test Tool:
N
Hours Before Start: (hr)
Time before test:
(hr)
Cmt Found on Tool:
N
Log/Survey Evaluation
Interpretation Summary
CBL Run: N
Cement Top:
(usft)
Under Pressure: (psi)
How Determined:
Bond Quality:
TOC Sufficient:
N
CET Run: N
Job Rating:
Bond Quality:
If Unsuccessful, Detection Indicator:
Temp Survey: N
Remedial Cement Required:
N
Hrs Prior to Log: (hr)
How Determined:
Printed 11/16/2016 9:53:55AM
_ E
101i'd NOV 14 2-215
BAKER
HUGHES
PRINT DISTRIBUTION DIST
ACGICC
COMPANY BP Exploration Alaska Inc
WELL NAME
Z -23C
FIELD Prudhoe Bay Unit
COUNTY North Slope Borough
BHI DISTRICT
Alaska
21 6081
27 75 1
Please sign and return one copy of this transmittal form to:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, 1-132-1 DATA LOGGED
900 E. Benson Blvd. t\ 1AS/201(o
K BENDER
Anchorage, Alaska 99508
to acknowledge receipt of this data.
LOG TYPE GR - RES
LOG DATE October 27, 2016
AUTHORIZED BY Patrick Rider
EMAIL Patrick. Rider(a)bakerhughes.com TODAYS DATE November 10, 2016
Revision
STATUS Final Replacement: No Details:
Requested by: ---
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. 801
PERSON ATTENTION
C+I
FIELD
FINAL
CD
LOGS
LOGS
(digital/image)
J#
Surveys
(Fi
UCOPIE
# OF PRINTS
# OF PRIN 16
OF COPIES
# OF COPIES
# O
4 J; J; J; J; J;
1 BP North Slope 1 0 1
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker
900 E. Benson Blvd.
(Anchorage, Alaska 99508
2 ConocoPhillips Alaska Inc. 0 1 1
'Attn: Ricky Elgaricio
ATO 3-344
700 G Street
Anchorage, AK 99510
3 ExxonMobil, Alaska 1 1 1
,Attn: Lynda M. Vaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4S tateof Alaska - AOGCC 1 1 1
Atm: Makana Bender
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 [NR - Division
Atm: Sean Clifton
550 West 7th Avenue, Suite 802
Anchorage, Alaska 99501
** Stamp "confidential' on all material deliver to DNR _ ,I
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Attn: David Itter
TOTALS FOR THIS PAGE: 0 3 4 5 0 0
TOTALS FOR ALL PAGES: 0 3 4 5 0 0
NOV 14 2016
North America - ALASKA - BP
Prudhoe Bay
PB Z Pad
Z-23
Z -23C
500292195003
Design: Z -23C
Final Survey Report
01 November, 2016
21 60��
27 75 1
Frpp---
'A as
BAKER
HUGHES
Project Prudhoe Bay, GPB, PRUDHOE BAY
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum:
NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Site PB Z Pad, TR -11-12
Site Position: Northing: 5,957,230.170 usft Latitude: 70° 17'33.051 N
From: Map Easting: 601,304.820 usft Longitude: 149" 10'47.365 W
Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 0.77 °
Well Z-23
Well Position +N/ -S 0.00 usft Northing: 5,959,360.030 usft Latitude: 70° 17' 54.240 N
+E/ -W 0.00 usft Easting: 599,459.070 usft Longitude: 149° 11'40.333 W
Position Uncertainty 0.00 usft Wellhead Elevation: 55.36 usft Ground Level: 56.02 usft
Wellbore Z -23C
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(I (I (nT)
BGG M2016 11/1/2016 18.06 80.97 57,554
Design
BP
rIA.2
pFinal
Survey Report
BAKER
Version:
Phase:
ACTUAL
HUGHES
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well Z-23
+EI -W Direction
Project: Prudhoe Bay
ND Reference:
Z -23B @ 81.06usft (Doyon 16)
(usft) (I
Site: PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
0.00 120.00
Well: Z-23
North Reference:
True
Wellbore: Z -23C
Survey Calculation Method:
Minimum Curvature
Page 2 COMPASS 5000 1 Build 81B
Design: Z -23C
Database:
EDM R5K-Alaska PROD -ANCP1
Project Prudhoe Bay, GPB, PRUDHOE BAY
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum:
NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Site PB Z Pad, TR -11-12
Site Position: Northing: 5,957,230.170 usft Latitude: 70° 17'33.051 N
From: Map Easting: 601,304.820 usft Longitude: 149" 10'47.365 W
Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 0.77 °
Well Z-23
Well Position +N/ -S 0.00 usft Northing: 5,959,360.030 usft Latitude: 70° 17' 54.240 N
+E/ -W 0.00 usft Easting: 599,459.070 usft Longitude: 149° 11'40.333 W
Position Uncertainty 0.00 usft Wellhead Elevation: 55.36 usft Ground Level: 56.02 usft
Wellbore Z -23C
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(I (I (nT)
BGG M2016 11/1/2016 18.06 80.97 57,554
Design
Z -23C
Audit Notes:
Version:
Phase:
ACTUAL
Tie On Depth: 9,263.64
Vertical Section:
Depth From (TVD)
+NI -S
+EI -W Direction
(usft)
(usft)
(usft) (I
25.70
0.00
0.00 120.00
11/1/2016 1 23 32PM
Page 2 COMPASS 5000 1 Build 81B
BP WIPS.g
Obp Final Survey Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well Z-23
Project:
Prudhoe Bay
TVD Reference:
Z -23B @ 81.06usft (Doyon 16)
Site:
PS Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Well:
Z-23
North Reference:
True
Wellbore:
Z -23C
Survey Calculation Method:
Minimum Curvature
Design:
Z -23C
Database:
EDM R5K - Alaska PROD - ANCP1
Survey Program
Date 11/1/2016
Azi (azimuth)
TVD
From
To
E/W
Northing
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
100.02
4,000.02 Z -23A Srvy 1 GYD-GC MS (Z-23PB1)
GYD-GC-MS
Gyrodata gyrocompassing m/s
4,100.02
6,700.02 Z -23A Srvy 1 GYD-GC MS (Z-23)
GYD-GC-MS
Gyrodata gyrocompassing m/s
6,718.00
6,748.00 Z -23B Srvy 1 Inc+Trend (Z -23B)
INC+TREND
Inclinometer+ known azi trend
6,809.92
9,263.64 Z -23B Srvy 2 MWD+IFR+MS (Z -23B)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
9,279.00
11,865.39 BHI MWD CTK 4-1/4" (Z -23C)
MWD
MWD - Standard
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
(usft)
0
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
25.70
0.00
0.00
25.70
-55.36
0.00
0.00
5,959,360.030
599,459.070
0.00
100.02
0,15
234.65
100.02
18.96
-0.06
-0.08
5,959,359.972
599,458.991
0.20
200.02
0.22
259.04
200.02
118.96
-0.17
-0.37
5,959,359.856
599,458.698
0.10
300.02
0.17
195.54
300.02
218.96
-0.35
-0.60
5,959,359.674
599,458.472
0.21
400.02
0.23
229.48
400.02
318.96
-0.62
-0.80
5,959,359.398
599,458.283
0.13
500.02
0.37
218.67
500.02
418.96
-1.00
-1.15
5,959,359.011
599,457.934
0.15
600.02
0.15
141.82
600.02
518.96
-1.36
-1.27
5,959,358.654
599,457.818
0.37
700.02
0.41
180.59
700.01
618.95
-1.82
-1.19
5,959,358.195
599,457.901
0.31
800.02
0.27
129.09
800.01
718.95
-2.33
-1.01
5,959,357.691
599,458.087
0.32
900.02
0.19
130.05
900.01
818.95
-2.58
-0.70
5,959,357.440
599,458.400
0.08
1,000.02
0.39
179.02
1,000.01
918.95
-3.03
-0.57
5,959,356.995
599,458.539
0.30
1,100.02
0.45
165.72
1,100.01
1,018.95
-3.75
-0.47
5,959,356.275
599,458.651
0.11
1,200.02
0.39
171.06
1,200.01
1,118.95
-4.47
-0.32
5,959,355.561
599,458.810
0.07
1,300.02
0.48
148.45
1,300.00
1,218.94
-5.16
-0.05
5,959,354.871
599,459.091
0.19
1,400.02
0.50
101.37
1,400.00
1,318.94
-5.60
0.60
5,959,354.437
599,459.744
0.39
1,500.02
0.73
100.25
1,499.99
1,418.93
-5.80
1.65
5,959,354.252
599,460.801
0.23
1,600.02
0.93
90.77
1,599.98
1,518.92
-5.93
3.09
5,959,354.146
599,462.241
0.24
1,700.02
1.32
83.32
1,699.96
1,618.90
-5.80
5.05
5,959,354.295
599,464.194
0.42
1,800.02
1.08
82.75
1,799.94
1,718.88
-5.55
7.13
5,959,354.576
599,466.270
0.24
V. Sec
(usft)
0.00
-0.04
-0.24
-0.35
-0.38
-0.49
-0.42
-0.1'
0.28
0.68
1.02
1.47
1.96
2.54
3.32
4.33
5.64
7.27
8.95
111112016 1 23.32PM Page 3 COMPASS 5000.1 Build 81B
bBP HIM
pFinal Survey Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB Z Pad
Well:
Z-23
Wellbore:
Z -23C
Design:
Z -23C
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well Z-23
Z -23B @ 81.06usft (Doyon 16)
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP 1
11/1/2016 1.23:32PM Page 4 COMPASS 5000.1 Build 81B
Survey
MD Inc
Azl (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
1,900.02
1.11
81.55
1,899.92
1,818.86
-5.29
9.02
5,959,354.862
599,468.159
0.04
10.46
I
2,000.02
1.17
88.42
1,999.90
1,918.84
-5.12
11.00
5,959,355.059
599,470.135
0.15
12.0
2,100.02
1.14
81.85
2,099.88
2,018.82
-4.95
13.00
5,959,355.254
599,472.137
0.14
13.74
2,200.02
1.08
86.49
2,199.87
2,118.81
-4.75
14.93
5,959,355.478
599,474.060
0.11
15.30
2,300.02
0.93
93.20
2,299.85
2,218.79
-4.74
16.68
5,959,355.514
599,475.810
0.19
16.81
2,400.02
0.74
118.35
2,399.84
2,318.78
-5.09
18.06
5,959,355.180
599,477.193
0.41
18.18
2,500.02
0.77
108.48
2,499.83
2,418.77
-5.61
19.26
5,959,354.677
599,478.406
0.13
19.491
2,600.02
0.76
139.30
2,599.82
2,518.76
-6.32
20.33
5,959,353.975
599,479.485
0.41
20.77
2,646.32
0.68
136.60
2,646.12
2,565.06
-6.76
20.72
5,959,353.547
599,479.881
0.18
21.33
13 3/8"
2,700.02
0.60
132.62
2,699.82
2,618.76
-7.18
21.15
5,959,353.129
599,480.314
0.18
21.91
2,800.02
0.51
170.47
2,799.81
2,718.75
-7.98
21.61
5,959,352.342
599,480.783
0.37
22.70
2,900.02
0.52
170.41
2,899.81
2,818.75
-8.86
21.76
5,959,351.457
599,480.944
0.01
23.28
3,000.02
0.33
192.45
2,999.80
2,918.74
-9.59
21.77
5,959,350.729
599,480.967
0.25
23.65
3,100.02
0.60
195.69
3,099.80
3,018.74
-10.38
21.57
5,959,349.941
599,480.774
0.27
23.87
3,200.02
0.19
208.80
3,199.80
3,118.74
-11.03
21.35
5,959,349.289
599,480.561
0.42
24.00
3,300.02
0.20
217.65
3,299.80
3,218.74
-11.31
21.16
5,959,349.003
599,480.378
0.03
23.9F
3,400.02
0.37
137.91
3,399.80
3,318.74
-11.69
21.27
5,959,348.627
599,480.493
0.39
24.27
3,500.02
0.37
135.80
3,499.79
3,418.73
-12.16
21.71
5,959,348.162
599,480.941
0.01
24.88
3,600.02
1.74
337.73
3,599.78
3,518.72
-10.98
21.36
5,959,349.331
599,480.575
2.09
23.99
3,700.02
4.12
326.92
3,699.64
3,618.58
-6.57
18.83
5,959,353.712
599,477.981
2.43
19.59
3,800.02
4.68
325.94
3,799.35
3,718.29
-0.18
14.58
5,959,360.044
599,473.651
0.57
12.72
3,900.02
3.88
328.20
3,899.07
3,818.01
6.08
10.51
5,959,366.245
599,469.502
0.82
6.07
4,000.02
2.26
325.90
3,998.92
3,917.86
10.59
7.63
5,959,370.714
599,466.554
1.62
1.31
4,100.02
1.69
319.00
4,098.86
4,017.80
13.33
5.55
5,959,373.432
599,464.445
0.62
-1.86
4,200.02
1.55
288.59
4,198.82
4,117.76
14.87
3.30
5,959,374.946
599,462.176
0.86
-4.58
4,300.02
2.15
268.22
4,298.77
4,217.71
15.25
0.15
5,959,375.277
599,459.014
0.88
-7.501
11/1/2016 1.23:32PM Page 4 COMPASS 5000.1 Build 81B
Survey
BP
reA.s
Ob p
Final Survey Report
BAKER
HUGHES
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well Z-23
TVDSS
Project: Prudhoe Bay
ND Reference:
Z -23B @ 81.06usft (Doyon 16)
Easting
Site: PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
V)
Well: Z-23
North Reference:
True
(usft)
Wellbore: Z -23C
Survey Calculation Method:
Minimum Curvature
(°/I00usft)
Design: Z -23C
Database:
EDM R5K - Alaska PROD - ANCP1
255.22
Survey
MD
Inc
Azi (azimuth)
ND
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft)
V)
M
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/I00usft)
(usft)
4,400.02
2.02
255.22
4,398.71
4,317.65
14.74
-3.43
5,959,374.722
599,455.443
0.49
-10.35
4,500.02
1.62
262.96
4,498.66
4,417.60
14.12
-6.54
5,959,374.058
599,452.345
0.47
-12.72
4,600.02
1.35
271.58
4,598.62
4,517.56
13.98
-9.12
5,959,373.883
599,449.766
0.35
-14.89
4,700.02
1.07
257.61
4,698.60
4,617.54
13.81
-11.21
5,959,373.691
599,447.679
0.40
-16.61
4,800.02
0.93
241.19
4,798.59
4,717.53
13.22
-12.83
5,959,373.081
599,446.063
0.32
-17.73
4,900.02
0.80
231.62
4,898.57
4,817.51
12.40
-14.09
5,959,372.240
599,444.816
0.19
-18.40
5,000.02
0.86
244.05
4,998.56
4,917.50
11.64
-15.31
5,959,371.462
599,443.604
0.19
-19.08
5,100.02
0.76
250.22
5,098.55
5,017.49
11.08
-16.61
5,959,370.892
599,442.313
0.13
-19.93
5,200.02
0.58
247.76
5,198.55
5,117.49
10.67
-17.71
5,959,370.462
599,441.226
0.18
-20.67
5,300.02
0.67
249.45
5,298.54
5,217.48
10.27
-18.72
5,959,370.052
599,440.215
0.09
-21.35
5,400.02
0.75
248.17
5,398.53
5,317.47
9.82
-19.88
5,959,369.588
599,439.067
0.08
-22.13
5,500.02
0.96
225.79
5,498.52
5,417.46
9.00
-21.08
5,959,368.744
599,437.870
0.39
-22.76
5,600.02
0.78
229.82
5,598.51
5,517.45
7.97
-22.21
5,959,367.707
599,436.763
0.19
-23.22
5,700.02
0.86
242.20
5,698.50
5,617.44
7.18
-23.39
5,959,366.902
599,435.590
0.19
-23.85
5,800.02
0.72
2-50.51
5,798.49
5,717.43
6.62
-24.65
5,959,366.326
599,434.341
0.18
-24.66
5,900.02
2.85
9.02
5,898.45
5,817.39
8.87
-24.85
5,959,368.569
599,434.109
3.26
-25.9
6,000.02
5.24
19.05
5,998.20
5,917.14
15.64
-22.97
5,959,375.365
599,435.900
2.48
-27.71
6,100.02
7.44
22.77
6,097.58
6,016.52
25.93
-18.97
5,959,385.704
599,439.759
2.24
-29.39
6,200.02
9.42
19.55
6,196.50
6,115.44
39.61
-13.73
5,959,399.454
599,444.822
2.03
-31.69
6,300.02
11.21
19.93
6,294.88
6,213.82
56.46
-7.67
5,959,416.382
599,450.650
1.79
-34.88
6,400.02
12.93
21.54
6,392.66
6,311.60
76.01
-0.25
5,959,436.023
599,457.812
1.75
-38.22
6,500.02
14.70
25.35
6,489.77
6,408.71
97.89
9.29
5,959,458.021
599,467.062
1.99
-40.90
6,600.02
16.19
26.97
6,586.15
6,505.09
121.78
21.04
5,959,482.065
599,478.499
1.55
-42.66
6,700.02
18.08
28.71
6,681.71
6,600.65
147.81
34.82
5,959,508.279
599,491.930
1.96
-43.75
6,718.00
18.74
28.80
6,698.77
6,617.71
152.79
37.55
5,959,513.293
599,494.596
3.67
-43.87
96/81,
6,734.00
20.10
24.71
6,713.86
6,632.80
157.54
39.94
5,959,518.074
599,496.920
12.02
-44.18
111112016 1 23:32PM Page 5 COMPASS 5000.1 Build 81B
BP WE&9
bpFinal Survey Report BAKER
HUGHES
Company: North America - ALASKA - BP
Project: Prudhoe Bay
Site: PB Z Pad
Well: Z-23
Wellbore: Z -23C
Design: Z -23C
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well Z-23
Z -23B @ 81.06usft (Doyon 16)
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting DLeg
V. Sec
(usft) V)
(')
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°HOOusft)
(usft)
6,748.00
20.10
24.71
6,727.01
6,645.95
161.91
41.95
5,959,522.470
599,498.873
0.00
-44.62
6,809.92
22.39
14.05
6,784.74
6,703.68
183.03
49.27
5,959,543.680
599,505.907
7.24
-48.8
6,905.74
25.03
12.80
6,872.46
6,791.40
220.51
58.19
5,959,581.268
599,514.332
2.80
-59.86
7,001.11
24.90
2.42
6,958.96
6,877.90
260.26
63.51
5,959,621.084
599,519.125
4.59
-75.13
7,095.11
25.06
352.30
7,044.21
6,963.15
299.78
61.68
5,959,660.570
599,516.770
4.54
-96.47
7,185.50
23.33
347.62
7,126.66
7,045.60
336.24
55.27
5,959,696.938
599,509.885
2.86
-120.25
7,280.04
22.07
344.11
7,213.88
7,132.82
371.61
46.40
5,959,732.185
599,500.542
1.96
-145.62
7,373.61
21.59
344.05
7,300.74
7,219.68
405.07
36.85
5,959,765.512
599,490.557
0.51
-170.62
7,466.08
21.10
344.68
7,386.87
7,305.81
437.48
27.78
5,959,797.798
599,481.057
0.59
-194.68
7,561.90
22.96
345.89
7,475.69
7,394.63
472.24
18.67
5,959,832.434
599,471.484
2.00
-219.95
7,653.80
22.75
345.60
7,560.38
7,479.32
506.84
9.88
5,959,866.906
599,462.239
0.26
-244.86
7,749.78
22.55
345.65
7,648.95
7,567.89
542.64
0.70
5,959,902.583
599,452.591
0.21
-270.71
7,840.56
23.78
342.19
7,732.42
7.651.36
576.93
-9.21
5,959,936.738
599,442.225
2.02
-296.44
7,933.11
23.78
342.55
7,817.11
7,736.05
612.50
-20.51
5,959,972.148
599,430.454
0.16
-324.01
8,029.57
22.52
341.35
7,905.80
7,824.74
648.55
-32.25
5,960,008.043
599,418.240
1.39
-352.21
8,126.87
22.31
341.28
7,995.75
7,914.69
683.70
-44.14
5,960,043.025
599,405.891
0.22
-380.08
8,224.65
21.93
341.08
8,086.33
8,005.27
718.55
-56.02
5,960,077.712
599,393.554
0.40
-407.76
8,320.16
21.26
340.91
8,175.14
8,094.08
751.79
-67.46
5,960,110.791
599,381.670
0.70
-434.321
8,405.39
20.98
342.97
8,254.64
8,173.58
780.98
-76.99
5,960,139.851
599,371.763
0.93
-457.161
8,502.06
21.96
344.82
8,344.61
8,263.55
814.97
-86.79
5,960,173.709
599,361.513
1.23
-482.65
8,596.05
22.96
344.95
8,431.47
8,350.41
849.64
-96.15
5,960,208.244
599,351.694
1.07
-508.09
8,690.49
26.63
345.46
8,517.18
8,436.12
887.93
-106.25
5,960,246.392
599,341.089
3.89
-535.98
8,784.16
30.86
344.79
8,599.29
8,518.23
931.45
-117.83
5,960,289,754
599,328.936
4.53
-567.77
8,849.33
33.97
343.37
8,654.30
8,573.24
965.03
-127.43
5,960,323.204
599,318.895
4.91
-592.87
8,913.00
34.74
343.95
8,706.87
8,625.81
999.51
-137.53
5,960,357.544
599,308.335
1.32
-618.86
DRILLING LINER 1
8,923.61
34.87
344.05
8,715.58
8,634.52
1,005.33
-139.20
5,960,363.342
599,306.590
1.32
-623.22
111112016 1:23 32PM
Page 6
COMPASS 5000.1 Build 81B
111112016 1:23 32PM Page 7 COMPASS 5000.1 Build 818
BP
IeAr2
b p
Final Survey Report
BAKER
HUGHES
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well Z-23
Project: Prudhoe Bay
TVD Reference:
Z -23B @ 81.06usft (Doyon 16)
Site: PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Well: Z-23
North Reference:
True
NIS
Wellbore: Z -23C
Survey Calculation Method:
Minimum Curvature
DLeg
Design: Z -23C
Database:
EDM R5K-Alaska PROD - ANCP1
(°)
111112016 1:23 32PM Page 7 COMPASS 5000.1 Build 818
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
(usft)
8,954.57
39.13
344.30
8,740.30
8,659.24
1,023.25
-144.28
5,960,381.194
599,301.275
13.77
-636.51E
8,985.11
43.40
344.54
8,763.25
8,682.19
1,042.65
-149.69
5,960,400.518
599,295.613
13.99
-650.96
9,017.29
47.60
346.11
8,785.80
8,704.74
1,064.85
-155.49
5,960,422.637
599,289.518
13.51
-667.08
9,047.03
48.27
345.35
8,805.72
8,724.66
1,086.25
-160.93
5,960,443.958
599,283.793
2.95
-682.49
9,078.35
49.18
342.64
8,826.39
8,745.33
1,108.87
-167.42
5,960,466.489
599,277.002
7.12
-699.43
9,110.77
53.62
339.92
8,846.61
8,765.55
1,132.85
-175.57
5,960,490.358
599,268.540
15.18
-718.47
9,141.88
58.29
338.69
8,864.02
8,782.96
1,156.96
-184.68
5,960,514.337
599,259.109
15.36
-738.42
9,172.00
62.41
333.74
8,878.93
8,797.87
1,180.88
-195.25
5,960,538.120
599,248.223
19.77
-759.54
9,205.78
66.53
331.48
8,893.48
8,812.42
1,207.93
-209.28
5,960,564.981
599,233.840
13.61
-785.21
9,235.75
70.17
330.51
8,904.54
8,823.48
1,232.29
-222.79
5,960,589.154
599,220.013
12.51
-809.09
9,263.64
73.99
328.98
8,913.12
8,832.06
1,255.21
-236.16
5,960,611.889
599,206.341
14.66
-832.12
TIP
9,279.00
76.57
328.44
8,917.02
8,835.96
1,267.90
-243.88
5,960,624.478
599,198.459
17.14
-845.15
KOP/Top of Whipstock
9,300.01
80.09
323.24
8,921.27
8,840.21
1,284.91
-255.43
5,960,641.336
599,186.684
29.46
-863.66
Interpolated Azimuth
9,330.47
86.56
315.82
8,924.82
8,843.76
1,307.89
-275.05
5,960,664.050
599,166.762
32.19
-892.15
Interpolated Azimuth
9,360.24
86.37
308.68
8,926.66
8,845.60
1,327.86
-297.03
5,960,683.721
599,144.521
23.95
-921.16
Interpolated Azimuth
9,390.89
86.96
301.41
8,928.44
8,847.38
1,345.41
-322.06
5,960,700.945
599,119.259
23.76
-951.62
9,421.10
83.75
291.53
8,930.89
8,849.83
1,358.82
-348.96
5,960,713.994
599,092.172
34.28
-981.63
9,448.67
80.96
280.40
8,934.57
8,853.51
1,366.33
-375.20
5,960,721.157
599,065.854
41.27
-1,008.10
9,480.31
83.28
269.63
8,938.92
8,857.86
1,369.06
-406.37
5,960,723.471
599,034.652
34.50
-1,036.46
9,510.47
83.60
256.75
8,942.38
8,861.32
1,365.51
-436.06
5,960,719.532
599,005.017
42.44
-1,060.40
9,540.49
83.13
245.31
8,945.86
8,864.80
1,355.84
-464.21
5,960,709.486
598,976.998
37.88
-1,079.94
9,570.63
84.55
234.18
8,949.11
8,868.05
1,340.76
-490.05
5,960,694.070
598,951.362
37.01
-1,094.78
9,606.75
82.79
218.52
8,953.11
8,872.05
1,316.07
-515.95
5,960,669.037
598,925.796
43.36
-1,104.86
111112016 1:23 32PM Page 7 COMPASS 5000.1 Build 818
BP W/,a9
pFinal Survey Report BAKER
HUGHES
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well Z-23
Project: Prudhoe Bay
TVD Reference:
Z -23B @ 81.06usft (Doyon 16)
Site: PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Well: Z-23
North Reference:
True
Wellbore: Z -23C
Survey Calculation
Method:
Minimum Curvature
Design: Z -23C
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft) V)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
9,637.44
84.38
209.23
8,956.55
8,875.49
1,290.77
-532.92
5,960,643.523
598,909.157
30.52
-1,106.91
9,667.19
85.14
205.02
8,959.27
8,878.21
1,264.41
-546.43
5,960,616.988
598,896.005
14.32
-1,105.4
9,697.41
83.79
202.57
8,962.18
8,881.12
1,236.89
-558.56
5,960,589.313
598,884.236
9.22
-1,102.18
9,727.37
82.78
197.38
8,965.69
8,884.63
1,208.94
-568.73
5,960,561.230
598,874.446
17.53
-1,097.00
9,757.97
83.81
192.60
8,969.26
8,888.20
1,179.59
-576.58
5,960,531.783
598,866.979
15.87
-1,089.13
9,790.51
84.77
18926
8,972.50
8,891.44
1,147.81
-582.72
5,960,499.921
598,861.263
10.63
-1,078.55
9,817.41
86.92
186.62
8,974.45
8,893.39
1,121.24
-586.42
5,960,473.308
598,857.910
12.64
-1,068.48
9,850.61
87.64
182.62
8,976.03
8,894.97
1,088.19
-589.10
5,960,440.231
598,855.678
12.23
-1,054.27
9,884.90
85.82
175.92
8,977.98
8,896.92
1,053.98
-588.66
5,960,406.032
598,856.565
20.22
-1,036.78
9,916.13
87.94
172.46
8,979.69
8,898.63
1,022.96
-585.50
5,960,375.063
598,860.131
12.98
-1,018.54
9,940.23
87.91
169.30
8,980.56
8,899.50
999.19
-581.69
5,960,351.341
598,864.262
13.10
-1,003.35
9,970.39
88.99
165.85
8,981.37
8,900.31
969.75
-575.20
5,960,321.994
598,871.137
11.98
-983.01
9,998.33
87.73
161.86
8,982.17
8,901.11
942.93
-567.44
5,960,295.280
598,879.254
14.97
-962.88
10,030.30
87.63
157.84
8,983.47
8,902.41
912.94
-556.44
5,960,265.449
598,890.651
12.57
-938.36
10,060.35
87.69
155.41
8,984.70
8.903.64
885.38
-544.52
5,960,238.052
598,902.925
8.08
-914.26
10,092.43
86.37
151.15
8,986.36
8,905.30
856.78
-530.12
5,960,209.639
598,917.702
13.88
-887.49
10,121.32
86.50
147.37
8,988.16
8,907.10
832.00
-515.39
5,960,185.060
598,932.763
13.07
-862.3<
10,149.57
87.70
143.19
8,989.59
8,908.53
808.81
-499.32
5,960,162.093
598,949.133
15.38
-836.83
10,180.01
89.11
140.16
8,990.43
8,909.37
784.95
-480.45
5,960,138.479
598,968.312
10.98
-806.56
10,214.26
89.32
137.48
8,990.90
8,909.84
759.17
-457.91
5,960,113.009
598,991.196
7.85
-776.151
10,240.81
88.68
134.57
8,991.37
8,910.31
740.07
-439.48
5,960,094.154
599,009.876
11.22
-750.63
10,269.97
90.37
131.15
8,991.61
8,910.55
720.24
-418.11
5,960,074.610
599,031.504
13.08
-722.21
10,300.97
88.59
128.15
8,991.89
8,910.83
700.46
-394.24
5,960,055.152
599,055.626
11.25
-691.66
10,329.57
91.60
126.01
8,991.84
8,910.78
683.22
-371.43
5,960,038.217
599,078.663
12.91
-663.28
10,360.99
91.75
122.83
8,990.92
8,909.86
665.47
-345.53
5,960,020.812
599,104.798
10.13
-631.97
10,395.40
92.09
120.07
8,989.77
8,908.71
647.53
-316.19
5,960,003.262
599,134.366
8.08
-597.59
10,421.35
92.58
117.79
8,988.71
8,907.65
634.99
-293.50
5,959,991.022
599,157.219
8.98
-571.671
11/1/2016 1:23:32PM
Page 8
COMPASS 5000.1 Build 81B
BP reA.9
p Final Survey Report BAKER
HUGHES
Company:
North America - ALASKA- BP
Local Co-ordinate Reference:
Well Z-23
Project:
Prudhoe Bay
TVD Reference:
Z -23B @ 81.06usft (Doyon 16)
Site:
PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Well:
Z-23
North Reference:
True
Wellbore:
Z -23C
Survey Calculation Method:
Minimum Curvature
Design:
Z -23C
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
-
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
(usft)
V)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(*1100usft)
(usft)
10,450.53
93.28
115.54
8,987.22
8,906.16
621.91
-267.46
5,959,978.292
599,183.428
8.07
-542.5E
10,479.88
92.76
111.16
8,985.67
8,904.61
610.30
-240.56
5,959,967.036
599,210.479
15.01
-513.48
10,515.49
93.69
111.83
8,983.67
8,902.61
597.27
-207.48
5,959,954.449
599,243.726
3.22
-478.32
10,541.53
93.17
114.93
8,982.11
8,901.05
586.96
-183.62
5,959,944.453
599,267.714
12.05
-452.50
10,580.06
94.30
120.01
8,979.60
8,898.54
569.23
-149.52
5,959,927.179
599,302.045
13.48
-414.10
10,610.75
95.04
125.00
8,977.10
8,896.04
552.80
-123.73
5,959,911.092
599,328.046
16.38
-383.55
10,640.39
93.75
128.48
8,974.83
8,893.77
535.12
-100.05
5,959,893.733
599,351.953
12.49
-354.21
10,669.73
93.68
133.19
8,972.93
8,891.87
515.98
-77.91
5,959,874.890
599,374.348
16.02
-325.46
10,700.75
90.21
135.83
8,971.87
8,890.81
494.25
-55.80
5,959,853.458
599,396.735
14.05
-295.45
10,730.21
88.40
140.37
8,972.23
8,891.17
472.33
-36.14
5,959,831.803
599,416.688
16.59
-267.46
10,759.99
88.74
139.47
8,972.97
8,891.91
449.56
-16.97
5,959,809.282
599,436.154
3.23
-239.47
10,790.07
90.92
137.00
8,973.06
8,892.00
427.12
3.06
5,959,787.118
599,456.480
10.95
-210.91
10,815.35
90.86
134.64
8,972.67
8,891.61
409.00
20.68
5,959,769.228
599,474.332
9.34
-186.59
10,846.91
90.46
132.03
8,972.31
8,891.25
387.34
43.63
5,959,747.880
599,497.566
8.37
-155.89
10,876.57
89.51
128.01
8,972.31
8,891.25
368.27
66.34
5,959,729.116
599,520.524
13.93
-126.69
10,905.78
91.08
125.48
8,972.16
8,891.10
350.80
89.74
5,959,711.955
599,544.154
10.19
-97.6
10,936.97
90.64
122.36
8,971.70
8,890.64
333.40
115.62
5,959,694.900
599,570.256
10.10
-66.57
10,966.62
92.21
120.33
8,970.96
8,889.90
317.98
140.93
5,959,679.820
599,595.768
8.65
-36.94
10,995.40
93.38
119.16
8,969.56
8,888.50
303.72
165.89
5,959,665.891
599,620.909
5.75
-8.20
11,025.11
93.60
116.10
8,967.75
8,886.69
289.97
192.16
5,959,652.490
599,647.357
10.31
21.43
11,055.99
95.29
112.24
8,965.35
8,884.29
277.36
220.24
5,959,640.260
599,675.600
13.61
52.051
11,085.85
93.17
109.83
6,963.15
8,882.09
266.68
248.03
5,959,629.943
599,703.527
10.73
81.46
11,115.92
92.40
106.09
8,961.69
8,880.63
257.42
276.60
5,959,621.064
599,732.210
12.68
110.83
11,145.77
93.44
101.21
8,960.17
8,879.11
250.39
305.56
5,959,614.415
599,761.258
16.69
139.43
11,175.73
93.23
97.34
8,958.42
8,877.36
245.57
335.07
5,959,609.987
599,790.829
12.91
167.39
11,212.70
93.87
92.41
8,956.13
8,875.07
242.43
371.82
5,959,607.338
599,827.618
13.42
200.79
11,256.11
91.60
86.45
8,954.06
8,873.00
242.86
415.16
5,959,608.345
599,870.941
14.68
238.11
11/1/2016 1:23.32PM Page 9 COMPASS 5000.1 Build 818
BP F/as
p Final Survey Report BAKER
HUGHES
Company: North America - ALASKA - BP
Project: Prudhoe Bay
Site: PB Z Pad
Well: Z-23
Wellbore: Z -23C
Design: Z -23C
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well Z-23
Z -23B @ 81.06usft (Doyon 16)
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
N/S
EM
Northing
Easting
DLeg
V. Sec
(usft) V)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
11,280.61
91.94
82.89
8,953.30
8,872.24
245.14
439.54
5,959,610.941
599,895.285
14.59
258.08
11,310.35
92.09
77.31
8,952.26
8,871.20
250.25
468.80
5,959,616.436
599,924.480
18.76
280.8,
11,340.33
90.89
71.92
8,951.48
8,870.42
258.19
497.69
5,959,624.765
599,953.254
18.41
301.91
11,372.01
90.31
66.83
8,951.14
8,870.08
269.35
527.33
5,959,636.310
599,982.739
16.17
322.00
11,402.73
89.97
64.02
8,951.07
8,870.01
282.12
555.26
5,959,649.452
600,010.500
9.21
339.81
11,431.51
89.32
67.50
8,951.25
8,870.19
293.94
581.50
5,959,661.611
600,036.576
12.30
356.62
11,460.51
88.10
72.38
8,951.90
8,870.84
303.88
608.72
5,959,671.912
600,063.665
17.34
375.23
11,491.21
87.94
77.53
8,952.96
8,871.90
311.84
638.34
5,959,680.264
600,093.174
16.77
396.90
11,520.85
86.77
81.83
8,954.33
8,873.27
317.14
667.47
5,959,685.952
600,122.221
15.02
419.47
11,551.91
88.68
86.28
8,955.56
8,874.50
320.36
698.33
5,959,689.572
600,153.033
15.58
444.59
11,580.69
88.13
90.30
8,956.36
8,875.30
321.22
727.08
5,959,690.811
600,181.766
14.09
469.06
11,610.53
88.44
94.55
8,957.26
8,876.20
319.95
756.87
5,959,689.944
600,211.571
14.27
495.49
11,638.17
85.39
97.65
8,958.75
8,877.69
317.02
784.31
5,959,687.376
600,239.042
15.72
520.72
11,670.81
85.20
103.77
8,961.43
8,880.37
310.98
816.25
5,959,681.758
600,271.064
18.70
551.41
11,700.91
84.80
107.02
8,964.05
8,882.99
303.02
845.16
5,959,674.183
600,300.070
10.84
580.42
11,730.35
85.91
113.70
8,966.44
8,885.38
292.82
872.65
5,959,664.344
600,327.693
22.93
609.33
11,766.97
85.42
119.27
8,969.21
8,888.15
276.54
905.32
5,959,648.502
600,360.573
15.23
645.76
11,796.17
83.14
124.59
8,972.12
8,891.06
261.18
929.97
5,959,633.473
600,385.421
19.74
674.79
11,823.83
85.20
127.49
8,974.93
8,893.87
244.99
952.22
5,959,617.583
600,407.878
12.82
702.15
11,847.63
85.24
130.32
8,976.91
8,895.85
230.10
970.67
5,959,602.936
600,426.526
11.85
725.58
11,865.39
84.68
129.10
8,978.47
8,897.41
218.80
984.28
5,959,591.815
600,440.283
7.53
743.01
11,927.00
84.68
129.10
8,984.19
8,903.13
180.11
1,031.89
5,959,553.763
600,488.393
0.00
803.59
Projection to TD - 2-7/8"
111112016 1.23:32PM Page 10 COMPASS 5000.1 Build 818
by BP rias
Final Survey Report BAKER
HUGHES
Company: North America - ALASKA - BP Local Co-ordinate Reference: Well Z-23
Project: Prudhoe Bay TVD Reference: Z -23B @ 81.06usft (Doyon 16)
Site: PB Z Pad MD Reference: Z -23B @ 81.06usft (Doyon 16)
Well: Z-23 North Reference: True
Wellbore: Z -23C Survey Calculation Method: Minimum Curvature
Design: Z -23C Database: EDM RSK- Alaska PROD -ANCP1
Casing Points
Measured Vertical Casing Hole
Depth Depth Diameter Diameter
(usft) (usft) Name (in) (in)
11,927.00 2-7/8" 2.875 4.250
Design Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
9,263.64
8,913.12
1,255.21
-236.16
TIP
9,279.00
8,917.02
1,267.90
-243.88
KOP/Top of Whipstock
9,300.01
8,921.27
1,284.91
-255.43
Interpolated Azimuth
9,330.47
8,924.82
1,307.89
-275.05
Interpolated Azimuth
9,360.24
8,926.66
1,327.86
-297.03
Interpolated Azimuth
11,927.00
8,984.19
180.11
1,031.89
Projection to TD
Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes
11/1/2016 1:23:32PM Page 11 COMPASS 5000.1 Build 81B
THE STATE
of
ALASKA
GOVERNOR BILL WALKER
Sean McLaughlin
Drilling Supervisor
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.oloska.gov
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU Z -23C
BP Exploration (Alaska), Inc.
Permit to Drill Number: 216-081
Surface Location: 720' FNL, 1739' FWL, SEC. 19, TI IN, R12E, UM
Bottomhole Location: 523' FNL, 3064' FWL, SEC. 19, TI IN, RI 2E, UM
Dear Mr. McLaughlin:
Enclosed is the approved application for permit to re -drill the above referenced development
well.
This permit to drill does not exempt you from obtaining additional permits or an approval
required by law from other governmental agencies and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
AOGCC reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to
comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result
in the revocation or suspension of the permit.
Sincerely,
Cathy . Foerster
Chair
DATED this day of July, 2016.
STATE OF ALASKA
'-ASKA OIL AND GAS CONSERVATION COMMIS
PERMIT TO DRILL
20 AAC 25.005
RECEIVED
JUN 0 7 2016
1 a. Type of Work:1
b. Proposed Well Class: Exploratory - Gas
E]Service - WAG ❑ Service - Disp 13
1 c. Specify Kell ell is proposed for:
Drill E3Lateral ❑
Stratigraphic Test ❑ Development - Oil
0 ' Service - Winj ❑ Single Zone 0 .
Coalbed Gas ❑ Gas Hydrates ❑
Redrill 0 . Reentry ❑
Exploratory - Oil ❑ Development - Gas
❑ Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket 173, Single Well ❑
11 . Well Name and Number:
BP Exploration (Alaska), Inc
Bond No. 29S105380
PBU Z -23C
3 Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 196612 Anchorage, AK 99519-6612
MD: 12249'' TVD: 8967'ss •
PRUDHOE BAY, PRUDHOE
OIL
4a. Location of Well (Governmental Section):
7. Property Designation (Lease Number):
ADL 028262
Surface: 720' FNL, 1739' FWL, Sec. 19, T11 N, R12E, UM •
8 Land Use Permit:
13. Approximate spud date:
Top of Productive Horizon: 458' FSL, 1545' FWL, Sec. 18, T1 1N, R12E, UM
85-009
November 15, 2016
9. Acres in Property: 2480
14. Distance to Nearest Property:
Total Depth: 523' FNL, 3064' FWL, Sec. 19, T1 1N, R12E, UM
6125'
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL: 81.06• feet
15. Distance to Nearest Well Open
to Same Pool:
Surface: x- 599459 • y- 5959360 • Zone - ASP 4
GL Elevation above MSL: 54.04 - feet
600'
16. Deviated wells: Kickoff Depth: 9280 feet
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 96 degrees
Downhole: 3659 Surface: 2779 -
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casinq Weiqht Grade Couolina Len th
MD I TVD MD I TVD(including stage data
4-1/4" 3-1/2"x3-1/4" 9.2#/6.4# 13Cr85 STL/TCII 3199'
9050' 8727'ss 12249' 8967'ss 174 sx Class 'G'
x2-7/8" /6.2# /HYD 11
19. PRESENT WELL CONDITION SUMMARY
(To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft):
1
Plugs (measured):
Effect. Depth MD (ft):
Effect. Depth TVD (ft):
Junk (measured):
1
10550 9050
None
10461
9001
None
Casing Length Size
Cement Volume MD TVD
Conductor/Structural 80 20"
28-108 28-108
Surface 2619 13-3/8"
3684 cu ft Permafrost 27-2647 27-2647
Intermediate 6693 9-5/8"
1894 cu ft Class 'G' 25-6718 25-6699
Liner 2348 7"
488 cu ft Class 'G' 6565-8913 6552-8707
Liner 1801 4-1/2"
281 cu ft Class 'G' 8747-10548 8567-9049
Perforation Depth MD (ft): 9175-10460 Perforation Depth TVD (ft): 8880-9001
20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will
not be deviated Contact Leemhuis, Jacob
from without prior written approval.
Email Jacob.Leemhuis@bp.com
Printed Name SeaR McLaughlin Title
Drilling Supervisor
Signature fU _ ALL u GdLt N Phone +1 907 564 4387 Date
Commission Use Only
Permit to Drill
Number: —�v
API Number: 50- 029-21950-03-00
Permit Approval
Date:
See cover letter for other
requirements:
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: [a/
Othe —
�SOO IpS► (ZnP TVI>r Samples req'd: Yes ❑ No 52' Mud log req'd: Yes ❑/ No LST
2Sc H2S measures
2CVGUi���S;
Yes Ctd No ❑ Directional svy req'd: Yes M No ❑
F's� Yt.�ail�\Atzj
(� Spacing exception req'd: Yes ❑ No 5 Inclination -only svy req'd: Yes ❑ No 12
L rz �P` f pL iapti �(�fi�1� Post initial MIT Yes ❑ ❑
uL Com-
injection req'd: No
2.G AAC.
Approved by: ` COMMISSIONER
APPROVED BY
THE COMMISSION Date:
ORIGINAL
Form 10-401 Revised 11/2015 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) Submit Form and
Lot) +�/ /, Attachments in Duplicate
To: Alaska Oil & Gas Conservation Commission
From: Jacob Leemhuis iD by
CTD Engineer
Date: June 1, 2016
Re: Z -23C Permit to Drill Request
Approval is requested for a permit to drill a CTD sidetrack slant producer from well Z -23B by the
Nordic 2 Coiled Tubing Drilling rig on or around November 15, 2016. The Z -23C sidetrack will be a
single string exit from the existing 4-1/2" liner. A monobore whipstock will be set on top of a CIBP that
was set pre -rig. Z -23C is designed to kick out in the 45P sands (underneath the 45N shale). The well
will drill down through the 45P sands and land (90 degree Inc) after crossing fault #1. Once structure
is confirmed, the well will undulate within the 46P sands with TD being called once the OWC is logged
or 8,966' TVDss is reached. Z -23C will be completed with a 3-1/4" x 2-7/8" 13Cr-85 solid liner,
cemented in place and selectively perforated.
Rig Work (scheduled to begin November 15, 2016)
1.
MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,779 psi).
2.
Set 4-1/2" Monobore Whipstock
3.
Mill 3.80" window and 10' of rathole.
4.
Drill Build: 4.25" OH, —324' 35 deg DLS planned).
5.
Drill Lateral: 4.25" OH, 2,615' 12 deg DLS planned).
6.
Run 3-1/4" x 2-7/8" 13Cr-85 liner leaving TOL at 9,050' MD.
7.
Pump primarycement job: 36 bbls, 15.3 ppg Class G, TOC at 9,050' MD. ti
8.
Perform cleanout run if needed
9.
Perform liner lap test*.
10.
Perforate 1,600'
11.
Freeze protect well to a min 2,100' TVDss.
12.
Close in tree, RDMO.
*Approved alternative plug placement per 20 AAC 25.112 (i)
Post -Rig Work
1.
V
Pull TWC. Tree work as necessary
2.
S
Set live GLVs. Set LTP (if necessary)
3.
F
Pressure Test LTP (if necessary)
4.
T
ASK flowback
5.
F
SIT
*Approved alternative plug placement per 20 AAC 25.112 (i)
Mud Program:
• Milling/drilling: 8.4 - 9.5 ppg solids free fluid for milling window and drilling (8.4 ppg provides
182 psi over -balance)
Disposal:
• All Class 1& II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at
DS 4 or Pad 3 at DS 6.
• Fluids > 1% hydrocarbons or flammables must go to Pad 3.
• Fluids >15% solids by volume must go to GNI.
• Fluids with solids that will not pass through %" screen must go to GNI.
• Fluids with pH > 11 must go to GNI.
Hole Size:
• 4.25" from 9,280' MD to 12,249' MD
Liner Program:
• 3-1/2" 9.2# 13Cr-85, STL Solid from 9,050' MD to —9,280' MD
• 3-1/4" 6.4# 13Cr-85, TCII Solid from 9,280' MD to 10,000' MD
• 2-7/8" 6.2# 13Cr-85, HYD511 Solid from —10,000' MD to 12,249' MD
• 36 bbls of 15.3 ppg cement will be used to cement the liner in place. (TOC at 9,050' MD)
• The primary barrier for this operation: minimum EMW of 8.4 ppg (provides 182 psi
overbalance)
• A cross over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams, and the CT packoff will be pressure tested to 250 psi low and 3,500 psi
high.
• The annular preventer will be tested to 250 psi low and 3,500 psi high.
Directional:
• See attached directional plan. Maximum planned hole angle is 96'.
• Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
• Distance to nearest property line: 6,125'
• Distance to nearest well within pool: 600'
Logging:
• MWD directional, gamma ray, and resistivity will be run over all of the open hole section.
Anti -Collision Failures:
• Z -23C passes BP Anti -Collision criteria.
Hazards:
r`
• Z -Pad is considered a H2S pad
• Most recent H2S level on Z -Pad was at Z -15A with 44 ppm recorded on 02/26/2016
• Lost circulation potential in Z23C is considered to be low (1 mapped fault in target location)
Reservoir Pressure: F
• The reservoir pressure on Z -23C is expected to be 3,659 psi at 8,795' TVDss. (8.0 ppg EMW)
• Maximum expected surface pressure with a full column of gas (0.10 psi/ft) to surface is 2,779
psi.
• An EMW of 8.4 ppg will provide a 182 psi overbalance to the reservoir.
Jacob Leemhuis CC: Well File
CTD Engineer Joe Lastufka
Jacob.Leemhuis@bp.com
907-564-4989
TREE = 4" CM/
WELLHEAD=
FMC
ACTUATOR=
BAKER
KB. ELEV =
91.74'
BF. ELEV =
55.36'
KOP =
3100'
Max Angle =
93 @ 9799'
Datum MD =
9.197'
Datum TVD =
8800' SS
13-3/8" CSG, 68#, L-80, ID = 12.415" 1--1 2657'
Minimum ID = 3.725" @ 8755'
4-1/2" HES XN NIPPLE
MECHANICAL WHIPSTOCK (08/25104) 1-� 6718'
19-5/8" HES EZSV (08/24/04) 6740'
9-5/8" CSG. 47#, L-80, ID = 8.681" 7472'
SEE PREVIOUS
SCHEMATIC FOR
WELL Z -23A & Z-23AL1
TBG & LNR DETAILS
PERFORATION SUMMARY
REF LOG: MWD VISION RES LOG ON 08/22/04
ANGLE AT TOP PERF: 63° @ 9175'
Note: Refer to Production DB for historical perf data
SIZE
SPF
I INTERVAL
Opn/Sqz DATE
2-7/8"
4
9175-9185
O 06/14/11
2-7/8"
4
9205-9225
O 06/16/11
2-7/8"
4
9275-9305
O 06/16/11
2-7/8"
4
9405-9435
O 06/15/11
2-7/8"
4
9640-9660
O 06/15/11
2-7/8"
4
9680-9710
O 06/15/11
2-112"
4
9745- 10160
O 09/08/04
2-1/2"
4
10224- 10254
O 09/08/04
2-1/2"
4
10292 - 10390
O 09/08/04
2-1/2"
4
10400- 10436
O 09/08/04
2-112"
4
10454 - 10460
O 09/08/04
SArt7Y NOTES: 700@9236'
***CHROME TBG***
2205' 1-14-1/2" HES X NIP, ID = 3.813"
C!1_��I�rt�ih_nI�T79�'►1
ST
MD
TVD DEV
TYPE
VLV LATCH
PORT
DATE
6
3095
3095 1
MMG
DOME RK
16
09/24/04
5
4995
4994 1
MMG
DOME RK
16
09/24/04
4
6386
6379 13
MMG
DOME RK
16
09/24/04
3
7451
7373 21
KBG2
DOME BK
16
09/24/04
2
8222
8083 22
KBG2
SO BK
22
08/02111
1 1
8580
8417 23
1 KBG21
DMY I BK 1
0
08/02/11
6565' —19-5/8" X 7" BKR ZXP LTP w /TIEBK SLV, ID = 6.28" 0
6579' 9-518" X 7" BKR HMC LNR HNGR w lR NIP, ID = 6.18"
MILLOUT WINDOW (Z -23B)
6718' - 6734'
8690' 4-1/2' HES—X--NI—P,—ID =-3.8-13-
1
$710' 7" X 4-1 r'2" BKR S-3 PKR, ID = 3.875"
8734' 4-1/2" HES X NIP.. ID = 3.813"
$747' 7" X 5" BKR ZXP LNR TOP PKR
w /TIEBK SLV, ID = 4.360"
8755' 4-1/2" HES XN NIP, ID = 3.725'
V8766HNGR w / R NIP, ID N 4"X5"BKRH CL- .25"
'
4-1%2" WLEG IID = 3.9586'S" X 4-112" XO
ID = 3.99"
9154' 4-1 i2" MARKER
4-1/2" TBG, 12.6#, 13CRVAM, I 8767'
IT
4-1/2" TAG
.0152 bpf, ID = 3.958"
7" LNR, 26#, L-80 BTC -M,
0383 bpf, ID = 6.276"
1 8913' 1
PBTD 10461'
4-1/2" LNR, 12.6#, L-80 BTC -M, .0152 bpf, ID = 3.958" 10548'
DATE
REV BY
COMMENTS
DATE
REV BY COMMENTS
10/18/89
FH
ORIGINAL COMPLETION
06/26111
SJW/ PJC ADPERFS (0 611 5-1 7 /1 1)
05/05/95
UNDER
SIDETRACK (Z -23A)
08/15/11
TAR/ PJC GLV C/O (8/2/11)
07/08/03
DAV/KK
SDTRCK ATTEMPT (Z-23AL1)
09/19/04
D16
SIDETRACK (Z -23B)
09/23/04
CAO/PJC I GLV C/O
102/27/061
JLJ/TLH
I DRLG DRAFT CORRECTIONS
PRUDHOE BAY UNIT
WELL: Z -23B
PERMIT No: 2041080
API No: 50-029-21950-02
SEC 19, TI IN, R1 2E, 4560' NSL & 3214' WEL
BP Exploration (Alaska)
TREE = 4" CNV
VVELLHEAD =
FMC
ACTUATOR =
BAKER
KB. ELEV =
91.74'
BF. ELEV =
55.36
KOP=
3100'
Max Angie =
93 @ 9799'
__
Datum MD–
9,19T
Datum TVD =
8800' SS
13-3/8- CSG, 68#, L-80, D = 12.415' 265T
Minimum ID = 3.726" @ 8766'
4-1/2" HES XN NIPPLE
Z -23C
SAhtTY NOTES: 70° @ 9236'
—CHROME TBG"'*
2205' 1—{ 4-1/2- FES X NIP, D = 3.813"
GAS LIFT MANDRELS
ST'
MD
TVD
DEV TYPE
I VLV LATCH
PORT DATE
6
3095
3095
1 MMG
DOME RK
16 09/24/04
5
1 4995
4994
1 MMG
DOME RK
16 09/24/04
4
6386
6379
13 MMG
DOME RK
16 09/24/04
3
7451
7373
21 KBG2
DOME BK
16 09/24/04
2
8222
8083
22 KBG2
SO BK
22 08/02/11
i
8580
8417
23 KBG2
DMY BK
0 08/02/11
PERFORATION SUMMARY
REF LOG: MWD VISION RES LOG ON 08/22104
ANGLE AT TOP PERF: 63" @ 9175'
Note: Refer to Production DB for historical perf data
6565' 9-5/8" X 7" BKR ZXP LTP w 1TEBK SLV, D = 6.28"
SPF
6579' 9-5/8" X 7" BKR HMC LNR HNGR w /R NP, D = 6.18"
OpNSgz
MILLOUT WINDOW (Z-2313) 6718' - 3734'
MECHANICAL WFPSTOCK (08/25/04) 6718'
4
9175-9185
8690' 4-1 /2" HES X NP, D = 3.813'
1 06114/11
8710' 7" X 4 112" BKR S 3 PKR ID = 3.875"
9-5/8" FES EZSV (08!24!04) 6740'
8734' 4-1/2" FES X NP, D= 3.813- l
O
8747' 7' X 5" BKR ZXP LNR TOP PKR
9-5/8" CSG, 47#, L-80, D = 8.681' 7472'
w /TEBK SLV, D = 4.360"
9275-9305
O
SEE P R E V %J U S
2-7/8"
SCHEMATIC FOR
8766' 7' X 5" BKR HMC LNR
W ELL Z 23A & Z 23AL1M
:aXN ` HNGRw/RNIP, D=4.25_
TBG & LNR DETAILS
876T 4-1/2" WLEG, D = 3.958"
Ems
8776'5- X 4-1/2" XO
7" LNR, 26#, L-80 BTC -M, 8913'
D = 3.99"
0383 bpf, D = 6.276'
9680-9710
PERFORATION SUMMARY
REF LOG: MWD VISION RES LOG ON 08/22104
ANGLE AT TOP PERF: 63" @ 9175'
Note: Refer to Production DB for historical perf data
SIZE
SPF
INTERVAL
OpNSgz
DATE
2-7/8"
4
9175-9185
O
1 06114/11
2-7/8'
4
9205-9225
O
06/16/11
2-7/8"
4
9275-9305
O
06/16/11
2-7/8"
4
9405-9435
O
06/15/11
2-7/8'
4
9640-9660
O
06/15/11
2-7/8'
4
9680-9710
O
06/15/11
2-1/2"
4
9745-10160
O
09/08/04
2-112"
4
10224 -10254
O
09/08/04
2-1/2"
4
10292 -10390
O
09/08/04
2-1/2'
4
10400 -10436
O
09/08/04
2-1/2"
4
10454 -10460
O
09/08/04
9154' 4-1/2" MARKER
4-1/2" TBG, 12.6#, 13CR VAM, 8767' JT w /RA TAG
.0152 bpf, D= 3.958" TJ L- 9,0 S 0 M
3 -1/21,x3 -1/41'X0 abovewi:dcw y &77°iac@ window
4-1/2"BakerMonobomwhjDstDck@ 9,280MDJ /I 35°/100'BUR
TD @ 12,249'MD
C]BP 9,310'M
3-1/411x2-7/$1113Cr-85 Lherto TD
PBTD
4-1/2" LNR, 12.6#, L-80 BTC -M, _0152 bpf, D -73.9W 10548/'
DATE
REV BY
COMMENTS
DATE
REV BY COMMENTS
10/18/89
FH
ORIGINAL COMPLETION
06/26/11
SJW/ PJC ADPERFS (06/15-17/11)
05/05195
UNDER
SIDETRACK (Z -23A)
08/15111
TAR/ PJC GLV C/O (8/2/11)
07/08/03
DAV/KK
SDTRCK ATTEMPT (Z-23AL1)
09/19104
616
SIDETRACK (Z -23B)
09/23/04
CAO/PJC GLV C/O
02/27/06
1 JLJ/TLH
DRLG DRAFT CORRECTIONS
PRUDHOE BAY UNIT
WELL: Z 23B
PERMIT No: 2041080
API No: 50-029-21950-02
SEC 19, T11N, R12E, 4560' NSL & 3214' WEL
BP Exploration (Alaska)
North America - ALASKA - BP
Prudhoe Bay
PB Z Pad
Z-23
Z -23C
Plan: Z -23C WP02
BP Coil Tubing Report
24 May, 2016
BP
BP Coil Tubing Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well Z-23
Project:
Prudhoe Bay
TVD Reference:
Mean Sea Level
Site:
PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Well:
Z-23
North Reference:
True ,
Wellbore:
Z -23C
Survey Calculation Method:
Minimum Curvature
Design:
Z-23CWP02
Database:
EDM RSK- Alaska PROD-ANCP1
Project Prudhoe Bay, GPB, PRUDHOE BAY
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS)
Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Site
PB Z Pad, TR -11-12
Site Position:
Northing:
From:
Map
Easting:
Position Uncertainty:
0.00 usft
Slot Radius:
Well
Z-23
Well Position
+N/ -S 0.00 usft
Northing:
+E/ -W 0.00 usft
Easting:
Position Uncertainty
0.00 usft
Wellhead Elevation:
Wellbore Z -23C
Magnetics Model Name Sample Date Declination
1°)
BGGM2015 11/1/2016 18.47
Design Z -23C WP02
Audit Notes:
Version: Phase: PLAN
Vertical Section: Depth From (TVD) +N/ -S
(usft) (usft)
-55.36 0.00
5,957,230.170 usft
601,304.820 usft
0.000 in
5,959,360.030 usft
599,459.070 usft
55.36 usft
Latitude:
Longitude:
Grid Convergence:
Latitude:
Longitude:
Ground Level:
Dip Angle Field Strength
1°) (nT)
80.99 57,503
Tie On Depth: 9,172.00
+E/ -W Direction
(usft) (I
0.00 120.00
70° 17'33.051 N
149° 10'47.365 W
0.77 °
70° 17'54.240 N
149° 11'40.333 W
54.04 usft
5/24/2016 2,38:03AM Page 2 COMPASS 5000.1 Build 81B
Company: North America - ALASKA- BP
Well Z-23
Project: Prudhoe Bay
Mean Sea Level
Site: PB Z Pad
Z -23B @ 81.06usft (Doyon 16)
Well: Z-23
True
Wellbore: Z -23C
Minimum Curvature
Design: Z -23C WP02
EDM R5K -Alaska PROD - ANCP1
Survey Tool Program Date 5/24/2016
1°)
From To
-195.25
(usft) (usft) Survey (Wellbore)
599,248.223
100.02 6,700.06 Z -23A Srvy 1 GYD-GC MS (Z -23A)
6,718.00 6,748.10 Z -23B Srvy 1 Inc+Trend (Z -23B)
6,809.92 9,172.00 Z -23B Srvy 2 MWD+IFR+MS (Z -23B)
9,172.00 12,249.00 Z -23C WP02 (Z -23C)
-206.77
Planned Survey
599,236.410
MD Inc Azi
TVDSS
(usft) 1°► 1°►
(usft)
9,172.00 62.41 333.74
8,797.87
Z -23B Actual Survey
13.61
9,200.00 65.82 331.86
8,810.09
9,205.78 66.53 331.48
8,812.42
Z -23B Actual Survey
599,220.013
9,235.75 70.17 330.51
8,823.48
Z -23B Actual Survey
1,255.21
9,263.64 73.99 328.98
8,832.06
Z-238 Actual Survey TIP
14.66
9,280.00 76.74 328.41
8,836.19
KOP
-244.38
9,300.00 78.30 327.49
8,840.51
End 9deg/100ft
-846.01
9,330.00 86.41 320.75
8,844.51
7
5,960,641.711
9,334.00 87.11 319.54
8,844.73
8
-30.00
9,400.00 84.99 296.48
8,849.35
9,500.00 83.38 261.33
8,859.81
9,554.00 83.51 242.30
8,866.03
9
1,312.39
9,600.00 83.76 226.10
8,871.16
BP
BP Coil Tubing Report
Local Co-ordinate Reference:
Well Z-23
TVD Reference:
Mean Sea Level
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K -Alaska PROD - ANCP1
Tool Name Description
GYD-GC-MS Gyrodata gyrocompassing m/s
INC+TREND Inclinometer + known azi trend
MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal
MWD MWD - Standard
N/S
EM
Northing
Easting
DLeg
V. Sec
TFace
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
1°)
1,180.88
-195.25
5,960,538.120
599,248.223
0.00
-759.54
0.00
1,203.28
-206.77
5,960,560.361
599,236.410
13.61
-780.71
-26.83
1,207.93
-209.28
5,960,564.981
599,233.840
13.61
-785.21
-26.01
1,232.29
-222.79
5,960,589.154
599,220.013
12.51
-809.09
-14.09
1,255.21
-236.16
5,960,611.889
599,206.341
14.66
-832.12
-21.10
1,268.73
-244.38
5,960,625.301
599,197.939
17.14
-846.01
-11.41
1,285.28
-254.75
5,960,641.711
599,187.360
9.00
-863.26
-30.00
1,309.33
-272.16
5,960,665.524
599,169.630
35.00
-890.36
-40.00
1,312.39
-274.72
5,960,668.555
599,167.030
35.00
-894.11
-60.00
1,352.67
-326.23
5,960,708.145
599,114.993
35.00
-958.86
-96.00
1,367.86
-422.94
5,960,722.054
599,018.100
35.00
-1,050.21
-94.39
1,351.20
-473.67
5,960,704.720
598,967.603
35.00
-1,085.81
-90.71
1,324.55
-510.62
5,960,677.585
598,931.009
35.00
-1,104.48
-90.00
5/24/2016 2:38:03AM Page 3 COMPASS 5000.1 Build 818
BP
BP Coil Tubing Report
Company: North America -ALASKA - BP
Local Co-ordinate Reference:
Well Z-23
Project: Prudhoe Bay
TVD Reference:
Mean Sea Level
Site: PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Well: Z-23
North Reference:
True
Wellbore: Z -23C
Survey Calculation
Method:
Minimum Curvature
Design: Z -23C WP02
Database:
EDM R5K-Alaska PROD
-ANCP1
Planned Survey
MD Inc
Azi
TVDSS
N/S
EM
Northing
Easting
DLeg
V. Sec
TFace
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
(°)
9,634.00
84.27
214.15
8,874.72
1,298.74
-532.37
5,960,651.492
598,909.604
35.00
-1.110.42
-88.19
End 35deg1100ft
9,700.00
84.81
206.21
8,881.01
1,241.99
-565.37
5,960,594.316
598,877.362
12.00
-1,110.62
-86.50
9,800.00
85.80
194.21
8,889.23
1,148.63
-599.73
5,960,500.521
598,844.244
12.00
-1,093.70
-85.74
9,884.00
86.78
184.16
8,894.67
1,065.99
-613.09
5,960,417.716
598,831.982
12.00
-1,063.94
-84.76
11
9,900.00
86.79
182.23
8,895.57
1,050.04
-613.98
5,960,401.758
598,831.303
12.00
-1,056.74
-90.00
10,000.00
86.88
170.22
8,901.11
950.59
-607.42
5,960,302.416
598,839.179
12.00
-1,001.34
-89.89
10,064.00
87.01
162.53
8,904.53
888.53
-592.37
5,960,240.563
598,855.045
12.00
-957.27
-89.23
12
10,100.00
87.40
158.22
8,906.29
654.67
-580.30
5,960,206.869
598,867.566
12.00
-929.89
-85.00
10,200.00
88.53
146.27
8,909.85
766.40
-533.83
5,960,119.227
598,915.189
12.00
-845.51
-84.791
10,300.00
89.74
134.32
8,911.37
689.61
-470.07
5,960,043.301
598,979.955
12.00
-751.90
-84.36
10,364.00
90.51
126.68
8,911.23
648.08
-421.44
5,960,002.415
599,029.123
12.00
-689.02
-84.18
13
10,400.00
92.27
122.73
8,910.35
627.59
-391.87
5,959,982.322
599,058.967
12.00
-653.16
-66.00
10,484.00
96.31
113.47
8,904.06
588.17
-318.08
5,959,943.884
599,133.260
12.00
-569.55
-66.101
14
10,500.00
96.30
115.40
8,902.30
581.59
-303.60
5,959,937.499
599,147.823
12.00
-553.72
90.00
10,600.00
96.12
127.47
8,891.45
529.84
-218.94
5,959,886.875
599,233.152
12.00
454.53
90.21
10,634.00
96.00
131.57
8,887.86
508.32
-192.87
5,959,865.713
599,259.507
12.00
-421.19
91.52
15
10,700.00
94.70
123.72
8,881.69
468.22
-140.88
5,959,826.306
599,312.018
12.00
-356.12
-99.00
10,800.00
92.59
111.89
8,875.31
421.77
-52.76
5,959,781.024
599,400.734
12.00
-256.58
-99.73
10,884.00
90.73
101.98
8,872.87
397.35
27.46
5,959,757.672
599,481.266
12.00
-174.89
-100.49
16
10,900.00
90.73
103.90
8,872.67
393.77
43.05
5,959,754.297
599,496.902
12.00
-159.60
90.00
11,000.00
90.70
115.90
8,871.42
359.80
136.90
5,959,721.577
599,591.187
12.00
-61.34
90.021
5/24/2016 2:38:03AM
Page 4
COMPASS 5000.1 Build 818
BP
BP Coil Tubing Report
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well Z-23
Project: Prudhoe Bay
TVD Reference:
Mean Sea Level
Site: PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Well: Z-23
North Reference:
True
Wellbore: Z -23C
Survey Calculation
Method:
Minimum Curvature
Design: Z -23C WP02
Database:
EDM R5K-Alaska PROD -ANCP1
Planned Survey
MD Inc
Azi
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
TFace
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
(°)
11,074.00
90.67
124.78
8,870.53
322.46
200.70
5,959,685.091
599,655.468
12.00
12.58
90.17
17
11,100.00
90.94
121.67
8,870.16
308.22
222.45
5,959,671.138
599,677.397
12.00
38.53
85.00
11,200.00
91.95
109.71
8,867.63
264.96
312.37
5,959,629.079
599,767.876
12.00
138.04
-85.04
11,300.00
92.87
97.73
8,863.41
241.30
409.25
5,959,606.707
599,865.053
12.00
233.77
-85.35
11,324.00
93.08
94.86
8,862.16
238.68
433.07
5,959,604.396
599,888.904
12.00
255.71
-85.85
18
11,400.00
93.04
85.72
8,858.10
238.29
508.88
5,959,605.015
599,964.706
12.00
321.56
-90.00
11,469.00
92.94
77.43
8,854.50
248.38
576.98
5,959,615.998
600,032.664
12.00
375.49
-90.491
19
11,500.00
92.93
81.16
8,852.91
254.13
607.40
5,959,622.149
600,062.997
12.00
398.96
90.001
11,600.00
92.83
93.17
8,847.87
259.06
706.97
5,959,628.396
600,162.483
12.00
482.72
90.19
11,700.00
92.60
105.18
8,843.12
243.15
805.39
5,959,613.798
600,261.103
12.00
575.91
90.80
11,739.00
92.48
109.87
8,841.39
231.42
842.54
5,959,602.562
600,298.395
12.00
613.95
91.37
20
11,800.00
86.14
106.21
8,842.12
212.55
900.49
5,959,584.458
600,356.593
12.00
673.58
-150.00
11,900.00
75.79
100.04
8,857.82
190.09
996.48
5,959,563.276
600,452.857
12.00
767.93
-149.96
11,949.00
70.78
96.84
8,871.91
183.19
1,042.87
5,959,556.990
600,499.337
12.00
811.56
-148.98
21
12,000.00
70.89
90.36
8,888.67
180.17
1,090.92
5,959,554.606
600,547.415
12.00
854.68
-90.00
12,099.00
71.75
77.85
8,920.49
189.81
1,183.98
5,959,565.474
600,640.334
12.00
930.46
-87.87
22
12,100.00
71.75
77.97
8,920.80
190.01
1,184.91
5,959,565.685
600,641.260
12.00
931.16
90.00
12,200.00
72.17
90.59
8,951.88
199.45
1,279.30
5,959,576.371
600,735.503
12.00
1,008.18
89.961
12,249.00
72.67
96.74
8,966.69 •
196.46
1,325.89
5,959,574.002
600,782.125
12.00
1,050.02
86.04
TD at 12249.00
5/24/2016 2:38:03AM
Page 5
COMPASS
5000 1 Build 81B
i
Project: Prudhoe Bay
Site: PB Z Pad
Well: Z-23
Wellbore: Z -23C
,Obp L Plan: Z -23C WP02 Plus SWft MD (Z -232-23C)
AxvnMls mine NaM
Magnetic Nonh:te.47
Magnetic Feu
WELLBORE DETAILS: Z -23C
REFERENCEINFORM4TION
7-23C
Coordinate (RE) Reference. Well Z-23, True North
SY.O: 575033sn
65°°
Venwi(TVD)Refer— Mean S.Level
Dipk,gle:11.19
We:tvlrzot
parent Wellbore: Z-236
Secfion(VS)Referer�ce. Slot-(O.00N, O.00E)
nmeet eccNIDn
Tie On MD: 9172.00
Mee—dDepth Reference. Z-23B@81.06.ft(Duyon16)
0 Z-1002-10070
Celouhtion Mathgd: Minimum Curvature
5960370
59fi0285
Vi 4500
x5960200
m
5960115
Z 35
5960030
5959945
5959860-
gp00
5959775
5959690
Z-05/Z-05APB1
5959605
Z-t?5/Z-05
5959520 4/05/Z-05Ao Z -33/Z -33A 3500
h
5959435
o
Z -33/Z-33 (
5959350
Mean Sea Level
5000
Z-15275
65°°
SOO
r5960540
Easting (85 ustVin)
0 Z-1002-10070
Z-15/Z,15AP12
6'`PO 00 5960455
m
A + m
N m O m
m
V m
O m
m
m m
N O
A + m
o N O o
m m
m N
+ N
m N N
(n O O O
m m
m m
V m
to
O A
m
O O
O +
O
N fi A N
000
6gS>
_
�..,
�,
.�. _ ��... _. _
..,
m
_ _. -
- ____P v'. �. u'.,. ._S u
m-Z+116/Z
m o
—_r59
65 00
Z -32/Z 32C,
`,
Z 28/Z-28
��-Z-21/Z-21 Z -19/Z-1-9
/.i
`
Z -23/Z-23 116 n -
�09y,
Z
61050
5960965{._.._..
n'
-2. A
Z'-__.
2-29
Z-272 7
"'
Z-19/. 1f
Z -24/Z-24
11i6/Z-116PB1
-14/Z-146
P+e 50®}
00
-
11 Z-2
-22B
-
Z -211Z -21A -
-13/Z 3A
90 S00
-5960965
Z-32/Z-32BP82 ,ii
SS
00
�55550p0
-11 L-912PB2
Z -114/Z-11
Z-13! 13
Z -25/Z-2 00 Z-116/Z-116PB2
Z-118/Plan #I 3b Z-11
59160880
1. Z-
00
9 00
O
Z -69/Z-6
Z -26/Z -26A
5
0
Z-32/Z=32BP81
Z r 0
112/Z-11
°
Z-13/Z-13AP
00
o
Z -26/Z-26
y 5959945
5960880
59607951
-32/Z-32
➢ , 5°
50
% p
0
2-142-14
vr4
�5959860
4� Z -101/Z -10""i
p0
0
5
Z -23/Z -23A
S
500
4 0
Z -14/Z -141V
r5960795
sss9n D
5°
7
5000 9167
1100, O
OOO
N
80 00
N 5959690
Z -23/Z-236 �
N
ry O
O
5960710
5959605
00
35 9000
0
50
3500
5960625
Z -32/Z +32BL7
, -5959520
q00
3000
S00
��'
5960625
Z -32/Z - 32A
Z -20/Z-20 -5959435
/Z-10
0
0'.
Z -322-32B
5000
0
-1. q-1
5960370
59fi0285
Vi 4500
x5960200
m
5960115
Z 35
5960030
5959945
5959860-
gp00
5959775
5959690
Z-05/Z-05APB1
5959605
Z-t?5/Z-05
5959520 4/05/Z-05Ao Z -33/Z -33A 3500
h
5959435
o
Z -33/Z-33 (
5959350
Mean Sea Level
5000
Z-15275
65°°
SOO
r5960540
0 Z-1002-10070
Z-15/Z,15AP12
6'`PO 00 5960455
Z -15/Z -(5A
000
6gS>
Z-15/Z-15APB1 t
59fi0370
65 00
O
sssazas o
`'600
8pp0
0
P+e 50®}
00
500
Z-210/Z-210PB1 5960200
� l
2°0°
p00
2 0 �0
SS
00
�
Z -210/Z-210 �� 5960115 �1
95
�
Ss OD
3
4
00
9 00
O
5960030
0
5
0
0
o
y 5959945
7500
4
% p
0
vr4
�5959860
900°
0
�
U 5959775
4 0
2000 5 D
7
0
>
1100, O
OOO
N
N 5959690
0
N
ry O
O
5959605
00
0
3500
, -5959520
65p
o
4 0
� mo
`SO 0
-5048 50
2
Z -20/Z-20 -5959435
/Z-10
0
2
X % 00
0
-1. q-1
959350
N
Easting (85 usft/in)
North America - ALASKA - BP
Prudhoe Bay
PB Z Pad
Z-23
Z -23C
Z -23C WP02 Plus 500ft MD
Anticollision Summary Report
24 May, 2016
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00usft
Reference Well:
Z-23
Well Error:
0.00usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02 Plus 500ft MD
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well Z-23
Mean Sea Level
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Z -23C WP02 Plus 500ft MD
Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA
Depth Range: 9,172.00 to 12,749.00usft Scan Method: Tray. Cylinder North
Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic
Survey Tool Program Date 5/24/2016
From To
(usft) (usft) Survey (Wellbore)
100.02 6,700.06 Z -23A Srvy 1 GYD-GC MS (Z -23A)
6,718.00 6,748.10 Z -23B Srvy 1 Inc+Trend (Z -23B)
6,809.92 9,172.00 Z -23B Srvy 2 MWD+IFR+MS (Z -23B)
9,172.00 12,749.00 Z -23C WP02 Plus 500ft MD (Z -23C)
Tool Name Description
GYD-GC-MS Gyrodata gyrocompassing m/s
INC+TREND Inclinometer+ known azi trend
MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal
MWD MWD - Standard
5/24/2016 2:15.51AM Page 2 of 5 COMPASS 5000.1 Build 81B
BP
Anticollision Report
Company:
North America -ALASKA- BP
Local Co-ordinate Reference:
Well Z-23
Project:
Prudhoe Bay
TVD Reference:
Mean Sea Level
Reference Site:
PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Site Error:
0.00usft
North Reference:
True
Reference Well:
Z-23
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
Z -23C
Database:
EDM R5K-Alaska PROD - ANCP1
Reference Design:
Z -23C WP02 Plus 500ft MD
Offset TVD Reference:
Offset Datum
Summary
Reference Offset Centre to
No -Go Allowable
Measured Measured Centre
Distance Deviation Warning
Site Name
Depth Depth Distance
(usft) from Plan
Offset Well - Wellbore - Design
(usft) (usft) (usft)
(usft)
PB Chev Tr
CHEV181112 - CHEV181112 - CHEV181112
Out of range
PB Z Pad
Plan Kup Z-106 (27+30) v6 - Plan Z-106 - Plan #4
Out of range
Z-01 - Z-01 - Z-01
Out of range
Z-01 - Z-01 A- Z-01 A
Out of range
Z-01-Z-01APB1-Z-01APB1
Out of range
Z-01 - Z-01APB2 - Z-01APB2
Out of range
Z-01 - Z-01 B- Z-01 B
Out of range
Z-02 - Z-02 - Z-02
Out of range
Z-02 - Z -02A - Z -02A
Out of range
Z-04 - Z-04 - Z-04
Out of range
Z-04 - Z -04A - Z -04A
Out of range
Z-05 - Z-05 - Z-05
Out of range
Z-05 - Z -05A - Z -05A
Out of range
Z-05 - Z-05APB1 - Z-05APB1
Out of range
Z-100 - Z-100 - Z-100
Out of range
Z-101 -Z-101 -Z-101
Out of range
Z-103 - Z-103 - Z-103
Out of range
Z-103 - Z-103PB1 - Z-103PB1
Out of range
Z-103 - Z-103PB2 - Z-103PB2
Out of range
Z-11 - Z-11 - Z-11
Out of range
Z-11 - Z -11A - Z -11A
Out of range
Z-112 - Z-112 - Z-112
Out of range
Z-112 - Z-112PB1 - Z-112PB1
Out of range
Z-112 - Z-112PB2 - Z-112PB2
Out of range
Z-114 - Z-114 - Plan #21 Z-114
Out of range
Z-114 - Z-114 - Z-114
Out of range
Z-116 - Z-116 - Z-116
Out of range
Z-116 - Z-116PB1 - Z-116PB1
Out of range
Z-116 - Z-116PB2 - Z-116PB2
Out of range
Z-118 - Z-118 - Plan #13b Z-118
Out of range
Z-12 - Z-12 - Z-12
Out of range
Z-13 - Z-13 - Z-13
Out of range
Z-13 - Z-1 3A - Z-1 3A
Out of range
Z-13 - Z-13APB1 - Z-13APB1
Out of range
Z-14 - Z-14 - Z-14
Out of range
Z-14 - Z -14A - Z -14A
Out of range
Z-14 - Z -14B - Z-146
Out of range
Z-15 - Z-15 - Z-15
Out of range
Z-15 - Z-1 5A - Z-1 5A
Out of range
Z-15 - Z-15APB1 - Z-15APB1
Out of range
Z-15 - Z-15APB2 - Z-15APB2
Out of range
Z-17 - Z-17 - Z-17
Out of range
Z-17 - Z -17A - Z-1 7A
Out of range
Z-17 - Z-17APB1 - Z-17APB1
Out of range
Z-19 - Z-19 - Z-19
Out of range
Z-19 - Z-1 9A - Z-1 9A
Out of range
Z-20 - Z-20 - Z-20
Out of range
Z-21 - Z-21 - Z-21
Out of range
Z-21 - Z-21 A- Z-21 A
Out of range
Z-210 - Z-210 - Z-210
Out of range
Z-210 - Z-210PB1 - Z-210PB1
Out of range
5/24/2016 2:15:51AM Page 3 of 5 COMPASS 5000.1 Build 81B
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00usft
Reference Well:
Z-23
Well Error:
0.00usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02 Plus 500ft MD
Summary
Site Name
Offset Well - Wellbore - Design
PB Z Pad
Z-22 - Z-22 - Z-22
Z-22 - Z -22A - Z -22A
Z-22 - Z -22B - Z -22B
Z-23 - Z-23 - Z-23
Z-23 - Z -23A - Z -23A
Z-23 - Z-23AL1 XX ( has reports do not delete) - Z
Z-23 - Z -23B - Z -23B
Z-23 - Z -23C - Z -23C WP02
Z-24 - Z-24 - Z-24
Z-25 - Z-25 - Z-25
Z-26 - Z-26 - Z-26
Z-26 - Z -26A - Z -26A
Z-27 - Z-27 - Z-27
Z-28 - Z-28 - Z-28
Z-29 - Z-29 - Z-29
Z-32 - Z-32 - Z-32
Z-32 - Z -32A - Z -32A
Z-32 - Z -32B - Z -32B
Z-32 - Z-32BL1 - Z-32BL1
Z-32 - Z-32BPB1 - Z-32BPB1
Z-32 - Z-32BPB2 - Z-32BPB2
Z-32 - Z -32C - Plan #7b Z -32C apprved
Z-32 - Z -32C - Z -32C
Z-33 - Z-33 - Z-33
Z-33 - Z -33A - Z -33A
Z-39 - Z-39 - Z-39
Z-39 - Z -39A - Z -39A
Z-50 - Z-50 - Plan #8 Z-50 v6
Z-50 - Z-50 - Z-50
Z-69 - Z-69 - Z-69
BP
Anticollision Report
Local Co-ordinate Reference:
Well Z-23
ND Reference:
Mean Sea Level
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Output errors are at
1.00 sigma
Database:
EDM R5K - Alaska PROD - ANCP1
Offset ND Reference:
Offset Datum
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Depth
Depth
Distance
(usft)
from Plan
(usft)
(usft)
(usft)
(usft)
Out of range
Out of range
Out of range
Out of range
9,186.09
9,225.00
145.14
67.53
79.39
Pass - Major Risk
Out of range
9,480.00
9,550.00
113.17
1.21
113.17
Pass - NOERRORS
12,249.00
12,249.00
0.00
0.26
0.00
Pass - NOERRORS
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
5/24/2016 2:15:51AM Page 4 of 5 COMPASS 5000.1 Build 81B
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
O.00usft
Reference Well:
Z-23
Well Error:
O.00usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02 Plus 500ft MD
BP
Anticollision Report
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well Z-23
Mean Sea Level
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to Z -23B @ 81.06usft (Doyon 16) Coordinates are relative to: Z-23
Dffset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04
central Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 0.76°
Ladder Plot
200 - -
-------------------- ---- -- -- ------ -------
0150-
C)
---01500
o -J-- ------ ---- ------------- - - -'--- - - - - --
--
Q
(n 100-
Q)
00 N
U- --- ------------------- - - - - ----1-- - - - - - - -'- - - -
O
50
CD - LEGEND -- -
!, HEV181112,C V181112V1 - - Z 116,2-116PB2,Z-116PB2VOZ-23,Z-23AL1X� (has reports(
- - - - _- -. - - - - - - -- - -1 - - - - - - - - - - - -- - -- -. -
D (27+30)v6,Pla Z-106,Plan#4Z-106v6.1VO $ Z-118,?-118,Plan#13bZ-118VO Z-23,Z-23B,Z-23BV7
-0 V1 - Z12,Z-12,Z-12V1 Z-23,Z-23C,Z-23CWP02VO
E- 1AV4 0 7-13 7111- 1 - - -
B ,Z-01APB1V60 2000 42�' Z-1347066A,Z-13AV2 6000 8000 Z W5,Z-25V1 12000
B ,Z-01APB2V5 ->�- Z-13,Z-13APg, (-13A V3 �F Z -26,Z -26,Z -26V1
�- 1BV4 $ Z-14,Z-14,Z-14V1urgR�pth(2000usft/in)
-Ar Z-26, Z -26A, Z -26A V2
)2A V1
$ Z-14,Z-14B,Z-14BV9
-$- Z -28,Z -28,Z -28V1
IV7
$ Z-1 5, Z-1 5, Z-1 5 V1
iF Z-29, Z-29, Z-29 V1
14AV10
$ Z-15,Z-15A,Z-15AVO
- - Z -32,Z -32,Z -32V2
iV3
$ Z-15,Z-15APB1,Z-15APB1VO
Z-32, Z -32A, Z -32A VO
6A VO
$ Z-1 5, Z-1 5APB2, Z-1 5APB2 VO
-Q- Z-32,Z-32B,Z-32BVO
,Z-05APB1 VO
$ Z-1 7,Z -17,Z-1 7V1
$ Z-32,Z-32BL1,Z-32BL1 VO
100V7
$ Z-17,Z-17A,Z-17AVO
Z-32,Z-32BPB1,Z-32BPB1 VO
101 V5
$ Z-17,Z-17APB1,Z-17APB1 VO
-j- Z-32,Z-32BPB2,Z-32BPB2 VO
103 V1
- - Z-1 9, Z-1 9, Z-1 9 V1
$ Z-32,Z-32C,Plan #7bZ-32Cappned
5/24/2016 2.15.51AM Page 5 of 5 COMPASS 5000.1 Build 81B
Project: Prudhoe Bay - ANTI -COLLISION SETTINGS COMPANY DETAILS: North America - ALASKA - BP
Site: PBZ Pad
�.`p Well: 2.23 p MD, interval: 25.00
Ij
Interpolation Method: Calculation Method Minimum Curvature
Depth Range From: 12249.00 To 12749.00 Error System ISCWSA
Wellbore: Z -23C Results Limited By: Centre Distance: 1472.20 Scan Method: Tray. Cylinder North
Plan: Z -23C WP02 Plus, 500ft MD(Z-232-23C) Reference: Plan:Z-23C WP02 Plus 500ft MD(Z-23/Z-23C) Error Surf ac e: Elliptical Conic
Warning Method: Rules Based
Depth Range From: 12249.00 To 12749.00 WELLDETAILS: Z-23
Ground Level:
54.04
+N/ -S +EW Northing Easting Latiuude Longitude Slot
From Colour To MD 0.00 0.00 5959360.030 599459.070 70°1r 54.240N 149.11'40.333W
SECTION DETAILS
0 Sec MD Inc Azi TVD +W -S +E/ -W Dleg TFace VSect
1 9172.00 62.41 333.74 8797.87 1180.88 -195.25 0.00 0.00 -759.54
2 9205.78 66.53 331.48 8812.42 1207.94 -209.28 13.61 -26.83 -785.21
240 3 9235.75 70.17 330.51 8823.48 1232.29 -222.79 12.51 -14.09 -809.09
4 9263.64 73.99 328.98 8832.06 1255.21 -236.16 14.66 -21.10 -832.12
330 30 12249 12749 5 9280.00 76.74 328.41 8836.19 1268.73 -244.38 17.14 -11.41 -846.01
220 6 9300.00 78.30 327.49 8840.51 1285.28 -254.74 9.00 -30.00 -863.26
7 9330.00136.41 320.75 8844.51 1309.33 -272.16 35.00 -40.00 -890.36
8 9334.00 87.11 319.54 8844.73 1312.39 -274.72 35.00 -60.00 -894.11
200 9 9554.00 83.51 242.30 8866.03 1351.20 -473.67 35.00 -96.00 -1085.81
10 9634.00 84.27 214.15 8874.72 1298.74 -532.37 35.00 -90.00 -1110.42
' 11 9884.00 86.78 184.16 8894.67 1065.99 -613.09 12.00 -86.50 -1063.94
180 - --� 12 10064.00 87.01 162.53 8904.53 888.53 -592.37 12.00 -90.00 -957.27
13 10364.00 90.51 126.68 8911.23 648.08 -421.44 12.00 -85.00 -689.02
14 10484.00 96.31 113.47 8904.06 588.17 -318.08 12.00 -66.00 -569.55
160/ ' 15 10634.00 96.00 131.57 8887.86 508.33 -192.87 12.00 90.00 -421.19
� V 16 10884.00 90.73 101.98 8872.87 397.35 27.46 12.00 99.00 -174.89
17 11074.00 90.67 724.78 8870.53 322.46 200.70 12.00 90.00 12.58
18 11324.00 93.08 94.86 8862.16 238.68 433.07 12.00 -85.00 255.71
140 %' ` \\\ \ 19 11469.00 92.94 77.43 8854.50 248.38 576.98 12.00 90.00 375.49
300 / \�� 60 20 11739.00 92.48 109.87 8841.39 231.42 842.54 12.00 90.00 613.95
� 21 11949.00 70.78 96.84 8871.91 183.19 1042.88 12.00 150.00 811.56
/
120 21
�\ \ \\ 22 12099.00 71.75 77.85 8920.49 189.81 1183.99 12.00 90.00 930.46
23 12248.00 72.67 96.74 8966.69 196.46 1325.89 12.00 90.00 1050.02
/ / \ 24 12449.00 74.21 71.73 9024.52 215.71 1514.84 12.00 -90.00 1204.04
100 V A ,� � 25 12749.00 77.28 108.79 9100.88 213.78 1799.88 12.00 90.00 1451.85
80
„
CPlus 501
20
270. 90
20
.\ 40
60
80 SURVEY PROGRAM
Date: 2016-03 17T00.00 00 Validated: Yes Version:
100
j Depth From Depth To Survey/Plan Tool
100.02 6700.06 Z -23A Srvy 1 GYD-GC MS (Z -23A) GYD-GC-MS
120 6718.00 6748.10 Z -23B SrvyI Inc+Trend(Z-23B) INC+TREND
6809.92 9172.00 Z -23B Srvy2 MWD+IFR+MS(Z-23B) MWD+IFR+MS-WOCA
240
\ 0
120 9172.0 12749.00 Z -23C WP02 Plus 500ft MD (Z -23C) MWD
140
V �
160 _ _
180
200
210
220
240
150
180
Azimuth from North[] vs Centre to Centre Separation [20 usft/in]
LEGEND
Z-23, Z -23C, Z -23C WP02 VO
North America - ALASKA - BP
Prudhoe Bay
PB Z Pad
Z-23
500292195000
Z -23C
Z -23C WP02 Plus 500ft MD
Travelling Cylinder Report
24 May, 2016
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00 usft
Reference Well:
Z-23
Well Error:
0.00 usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02 Plus 500ft MD
BP
Travelling Cylinder Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well Z-23
Mean Sea Level
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Z -23C WP02 Plus 500ft MD
Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA
Depth Range: 12,249.00 to 12,749.00usft Scan Method: Tray. Cylinder North
Results Limited by: Maximum center -center distance of 1,472.20 usft Error Surface: Elliptical Conic
Survey Tool Program
Date 5/24/2016
From
To
(usft)
(usft) Survey (Wellbore)
100.02
6,700.06 Z -23A Srvy 1 GYD-GC MS (Z -23A)
6,718.00
6,748.10 Z -23B Srvy 1 Inc+Trend (Z -23B)
6,809.92
9,172.00 Z -23B Srvy 2 MWD+IFR+MS (Z -23B)
9,172.00
12,749.00 Z -23C WP02 Plus 500ft MD (Z -23C)
Casing Points
—
Summary
Tool Name Description
GYD-GC-MS Gyrodata gyrocompassing m/s
INC+TREND Inclinometer+ known azi trend
MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal
MWD MWD - Standard
Measured
Vertical
Casing
Hole
Depth
Depth
Diameter
Diameter
(usft)
(usft)
Name
(in)
(in)
2,646.36
2,565.10
13 3/8"
13.375
17.500
6,718.00
6,617.71
9 5/8"
9.625
12.250
8,913.00
8,625.81
DRILLING LINER 1
7.000
8.500
12,749.00
9,100.88
2-7/8"
2.875
4.250
Site Name
Offset Well - Wellbore - Design
PB Z Pad
Plan Kup Z-106 (27+30) v6 - Plan Z-106 - Plan #4
Z -116 -Z -116-Z-116
Z-116 - Z-116PB1 - Z-116PB1
Z-116 - Z-116PB2 - Z-116PB2
Z-118 - Z-118 -Plan #13b Z-118
Z -13 -Z -13-Z-13
Z-13 - Z-1 3A - Z-1 3A
Z-13 - Z-13APB1 - Z-13APB1
Z -14 -Z -14-Z-14
Z-14 - Z -14A - Z -14A
Z-14 - Z -14B - Z -14B
Z-15 - Z-15 - Z-15
Z-15 - Z-1 5A - Z-1 5A
Z-15 - Z-15APB1 - Z-15APB1
Z-15 - Z-15APB2 - Z-15APB2
Z-17 - Z-17 - Z-17
Z-17 - Z-1 7A - Z-1 7A
Z-17 - Z-17APB1 - Z-17APB1
Z-19 - Z-19 - Z-19
Z-19 - Z-1 9A - Z-1 9A
Z-20 - Z-20 - Z-20
Z-210 - Z-210 - Z-210
Z-210 - Z-210PB1 - Z-210PB1
Reference Offset Centre to No -Go Allowable
Measured Measured Centre Distance Deviation Warning
Depth Depth Distance (usft) from Plan
(usft) (usft) (usft) (usft)
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 2:00.15AM Page 2 COMPASS 5000.1 Build 81B
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00 usft
Reference Well:
Z-23
Well Error:
0.00 usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02 Plus 500ft MD
Summary
Site Name
Offset Well - Wellbore - Design
PB Z Pad
Z-23 - Z-23ALl XX ( has reports do not delete) - Z
Z-23 - Z -23C - Z -23C WP02
Z-24 - Z-24 - Z-24
Z-25 - Z-25 - Z-25
Z-26 - Z-26 - Z-26
Z-26 - Z -26A - Z -26A
Z-27 - Z-27 - Z-27
Z-39 - Z-39 - Z-39
Z-39 - Z -39A - Z -39A
Z-69 - Z-69 - Z-69
BP
Travelling Cylinder Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well Z-23
Mean Sea Level
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Offset Centre to No -Go Allowable
Measured Measured Centre Distance Deviation Warning
Depth Depth Distance (usft) from Plan
(usft) (usft) (usft) (usft)
Out of range
12,249.00 12,249.00 0.00 0.26 0.00 Pass - NOERRORS
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Offset Design
PB Z Pad - Z-23 - Z -23C - Z -23C WP02
Offset Site Error: 0 00 usft
Survey Program: 100-GYD-GC-MS, 6718-INC+TREND. 6810-MWD+IFR+MS-W0CA. 9172 -MWD
Rule Assigned: NOERRORS
Offset Well Error: 0.00 usft
Reference
Offset Semi Major Axis
Measured Vertical
Measured Vertical Reference Offset Toolface+ Offset Wellbore
Centre
Casing - Centre to
No Go
Allowable Warning
Depth Depth
Depth Depth Azimuth +N/S
+E/ -W
Hole Size Centre
Distance
Deviation
(usft) (usft)
(usft) (usft) (usft) (usft) (") usft
(usft)
(usft)
m usft
f 1 1 )
(usff)
(usft)
12,249.00 8,966.69
12,249.00 8,966.69 32.63 32.28 96.74 196.46
1,325.89
0.000 0.00
0.26
0.00 Pass - NOERRORS, CC, ES, SI
CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 2:00:15AM Page 3 COMPASS 5000.1 Build 818
BP
Travelling Cylinder Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well Z-23
Project:
Prudhoe Bay
ND Reference:
Mean Sea Level
Reference Site:
PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Site Error:
0.00 usft
North Reference:
True
Reference Well:
Z-23
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00 usft
Output errors are at
1.00 sigma
Reference Wellbore
Z -23C
Database:
EDM R5K - Alaska PROD - ANCP1
Reference Design:
Z -23C WP02 Plus 500ft MD
Offset ND Reference:
Offset Datum
Reference Depths are relative to Z -23B @ 81.06usft (Doyon 16) Coordinates are relative to: Z-23
Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04
Central Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 0.76 °
Ladder Plot
100-
75--
.0
0075 - - - _ -
(0
a 50
U
o '
m ;
m
U
25-
-------------------------------------------------------- ------
5------- ------ -------------------------J----------------
0
0 2000 4000 6000 8000 10000 12000
Measured Depth
LEGEND
-� Z-23,Z-23C,Z-23CWP02V0
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 2:00:15AM Page 4 COMPASS 5000.1 Build 81B
BP
Travelling Cylinder Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well Z-23
Project:
Prudhoe Bay
ND Reference:
Mean Sea Level
Reference Site:
PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Site Error:
0.00 usft
North Reference:
True
Reference Well:
Z-23
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00 usft
Output errors are at
1.00 sigma
Reference Wellbore
Z -23C
Database:
EDM R5K - Alaska PROD - ANCP1
Reference Design:
Z -23C WP02 Plus 500ft MD
Offset ND Reference:
Offset Datum
Reference Depths are relative to Z -23B @ 81.06usft (Doyon 16) Coordinates are relative to: Z-23
Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04
Central Meridian is 150° 0' 0.000 W Grid Convergence at Surface is: 0.76 °
Separation Factor
Plot
9.00
0
6.00
LL
0
`m
CL-- --- --
3.00-
0.00
0 2500 5000 7500 10000 12500
Measued Depth
LEGEND
—�• Z-23,Z-23C,Z-23CWP02V0
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5124/2016 2:00:15AM Page 5 COMPASS 5000.1 Build 81B
Company:
North America - ALASKA- BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00 usft
Reference Well:
Z-23
Well Error:
0.00 usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02 Plus 500ft MD
BP
Travelling Cylinder Report
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Well Z-23
Mean Sea Level
Z-236 @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
=ference Depths are relative to Z -23B @ 81.06usft (Doyon 16) Coordinates are relative to: Z-23
ffset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04
entral Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 0.76 °
Travelling Cylinder
Not
330 30
300 60
270 - 90
240 120
210 150
180
Azimuth from North [°] vs Centre to Centre Separation [0 usft/in]
LEGEND
—�- Z-23,Z-23C,Z-23C\AP02V0
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 2:00.15AM Page 6 COMPASS 5000.1 Build 81B
h„
I
Project: Prudhoe Bay
Site: PBZ Pad
Coordinate (NE) Reference: Well Z-23, True North
-
"muUs True Noe.a
by
'Sy
Parent Wellbore: Z -23B
Z-23
Well: Z-23
Wellbore: Z -23G
8710
Magner,%%
Strenp Argi :809
oD.ngie 120
Ground Level:
54.04
PIan:Z-23C
,N/ -S +EJ -W
MOCUBGGM20
8515]
REFERENCE INFORMATION
8580:
Coordinate (NE) Reference: Well Z-23, True North
WELL DETAILS: Z-23
Ver icel (TVD) Reference: Mean Sea Level
Parent Wellbore: Z -23B
Z-23B-ActualSiwey TIP -
8710
KOP
Ground Level:
54.04
8775
,N/ -S +EJ -W
88401
�
Northing
Easting
1050 z -13C Fault2
Latittude
Longitude
0.00
0.00
5959360.030 599459.070
70'17'54240N
149011'40.333W
8836.19 9280.00 KOP
�� 900
SECTIONDETAILS
.02
Sec
MD
Inc
Azi SSTVD
+W -S
+EbW
Dleg
TFace VSect Target
1
9172.00
62.41
333.74 8797.87
1180.88
-195.25
0.00
0.00 -759.54
2
9205.78
66.53
331.48 8812.42
1207.94
-209.28
13.61
-26.83 -785.21
3
9235.75
70.17
330.51 8823.48
1232.29
-222.79
12.51
-14.09 -809.09
4
9263.64
73.99
328.98 8832.06
1255.21
-236.16
14.66
-21.10 -832.12
5
9280.00
76.74
328.41 8836.19
1268.73
-244.38
17.14
-11.41 -846.01
6
9300.00
78.30
327.49 8840.51
1285.28
-254.74
9.00
-30.00 -863.26
7
9330.00
86.41
320.75 8844.51
1309.33
-272.16
35.00
-40.00 -890.36
8
9334.00
87.11
319.54 8844.73
1312.39
-274.72
35.00
-60.00 -894.11
9
9554.00
83.51
242.30 8866.03
1351.20
-473.67
35.00
-96.00 -1085.81
10
9634.00
84.27
214.15 8674.72
1298.74
-532.37
35.00
-90.00 -1110.42
11
9884.00
86.78
184.16 8894.67
1065.99
-613.09
12.00
-86.50 -1063.94
12
10064.00
87.01
162.53 8904.53
888.53
-592.37
12.00
-90.00 -957.27
13
10364.00
90.51
126.68 8911.23
648.08
-421.44
12.00
-85.00 -689.02
14
10484.00
96.31
113.47 8904.06
588.17
-318.08
12.00
-66.00 -569.55
15
10634.00
96.00
131.57 8887.86
508.33
-192.87
12.00
90.00 421.19
16
10884.00
90.73
101.98 8872.87
397.35
27.46
12.00
-99.00 -174.89
17
11074.00
90.67
124.78 8870.53
322.46
200.70
12.00
90.00 12.58
18
11324.00
93.08
94.86 8862.16
238.68
433.07
12.00
-85.00 255.71
19
11469.00
92.94
77.43 8854.50
248.38
576.98
12.00
-90.00 375.49
20
11739.00
92.48
109.87 8841.39
231.42
842.54
12.00
90.00 613.95
21
11949.00
70.78
96.84 8871.91
183.19
1042.88
12.00 -150.00
811.56
22
12099.00
71.75
77.85 8920.49
189.81
1183.99
12.00
-90.00 930.46
23
12249.00
72.67
96.74 8966.69
196.46
1325.89
12.00
90.00 1050.02
8515]
REFERENCE INFORMATION
8580:
Coordinate (NE) Reference: Well Z-23, True North
86451
Ver icel (TVD) Reference: Mean Sea Level
Parent Wellbore: Z -23B
Z-23B-ActualSiwey TIP -
8710
KOP
End 9dcg/I (X11
8775
88401
�
Z-23CTI
R 7
WELLBORE DETAILS: Z -23C
REFERENCE INFORMATION
Z -23C
Coordinate (NE) Reference: Well Z-23, True North
Z -23/Z-23
Ver icel (TVD) Reference: Mean Sea Level
Parent Wellbore: Z -23B
Section(VS)Refemnce: Slot-(0.00N,0.00E)
Tie on MD: 9172.00
Measured Dwlh Reference: Z -23B@ B1.06usft(Doyon 16)
Calculation WOW Minimum G-Wre
Slot
1500
o3R_�N
1350 -
Z-23CTI
I.
- -Z-2317,-23A
Z -23/Z-23
ANNOTATIONS
TVD MD Annotation ----
1200'
8797.87 9172.00 Z -23B Actual SurAy
8812.42 9205.78 Z-238 Actual Survey
1050 z -13C Fault2
8823.48 9235.75 Z-23BActualSulveyY
8832.06 9263.64 Z -23B Actual Survey TIP
ty r
Vw
8836.19 9280.00 KOP
�� 900
- -
.02
8840.51 9300.00 End9deg/100ft
8844.51 9330.00 7
p 750- Z-23CFault I
2-2 C72
8844.73 9334.00 B
8866.03 9554.00 9
�
9634.00 End35deg/100ft
6008874.72
8894.67 9884.00 11
3C T3
8904.53 10064.00 12
450
8911.23 10364.00 13
8904.06 10484.00 14
o
z
Z-23CFault3
8887.86 10634.00 15
^ 3W
23CT4
Z-232 23C
8872.87 10884.00 16
8870.53 11074.00 17
150
Z-23CT5
8862.16 11324.00 18
z-23CT6 Z -231M
8854.50 11469.00 19
0
n
8841.39 11739.00 20
8871.91 11949.00 21
8920.49 12099.00 22 1
-150
8966.69 12249.00 TO at 12249.00
Z-23CFault4
-3W..
-450'
-600 -.
-12(Hl -1050 -9(M
-750 -600 -450
-0 300 -150 0 150 300
450 600 750 900 1050 1200 1350 1500
West( -)/East(+) (150 usft/in)
Z -23C
890511 En 5 : 16 17 _. 18 19 20
11 12 13 14 15Z-23CT6 21 Z -2 312-23C
- Z -23C T4 Z -23C TS 22
8970 -
"L-23C T2 Z -23C T3 - - . - '-
9035- _ _ 1 TD ntl2249.(X)
Z -23C T7
9100!
Mevl0S65 Level
L�1365 -130(1 1235 -1170 -1105 -1040 -975 -910 -845 -780 -715 -650 -585 -520 -455 -390 -325 -260 -195 -130 -65 U 65 l 130 195 260 325 390 1 455 5r.-._._7 ---7 8
20 5855 6 650 50 715 780 845 910 975 1040 1105 11170
Vertical Section at 120.00° (65 usft/in)
C
W
Mean Ss
Project: Prudhoe Bay
Site: PBZPad
Well: Z-23
Wellbore: Z -23C
Plan: Z -23C W PO2 (Z -232-23C)
A:v�rocs bT-Nm
Magnetic NOM:19.d;
Magh—Feu
S.rgt 575013.
Op Angle: 60.91.
_ D, .1, M1
Mam BWM201
WELLBORE DETAILS: Z -23C
REFERENCE INFORMATION
Z -23C
Co-ordinate (W5) Reference: Wet Z-23, True Nath
Verfiml(TVD) Reference: Mean See Level
Parent Wellbore: Z -23B
Secten(VS)Refere— S1.t-(O.00N,O.00E)
Tie On MD: 9172.00
Measured Depth Reference: Z -23B @ 01.06uat (Doyon 16)
Cebuletim Aklhod: Minimum CurveWre
West( -)/East(+) (60 usft/in)
Z-_20
Project: Prudhoe Bay
Site: PB Z Pad
Well: Z-23
Wellbore: Z -23C
Plan: Z -23C WP02 (Z -232-23C)
ANTI -COLLISION SETTINGS
COMPANY DETAILS: North America - ALASKA - BP
Interpolation Method: MD, interval: 25.00 Calculation Method: Minimum Curvature
Depth Range From: 9172.00 To 12249.00 Error System: ISCWSA
Results Limited By: Centre Distance: 1422.20 Scan Method: Tray. Cylinder North
Reference: Plan: Z -23C WP02 (Z -23/Z -23C) Error Surface: Elliptical Conic
380
Z -23A
360
340
i
LEGEND
320
��
_• CHEV181112, CHEV181112, CHEV181112 V1
it
-• Z-23, Z-23, Z-23 V3
v> Z-23, Z -23A, Z -23A V2
300'-
Z-23, Z -23B, Z -23B V7
a Z-50, Z-50, Z-50 VO
280
it
_260
c_
J)
N
240
0
N
.o220 -
220as
as
200
ar
aci 180
U
o
��I
(1) 160-
C
(11
U 140
ii
120
Possible Offset Well
1004
111,Magnetic
Interference:
From To
80V
KOP - 9,420' MD
60-
0
40-
40
-
20
Z-23 B
0
N W
O O O O O
O O O O O O O O O O O O O
O O O O O O O O O O
Measured Depth (100 usft/in)
O O O O O O O O O O O O O
O O O O O O O O O O O O O
Project: PB Z Pad ANTI-COLLISION SETTINGS COMPANY DETAILS: North America - ALASKA - BP
Site: Prudhoe Bay
Interpolation Method: MD, interval: 25.00 Calculation Method: Minimum Curvature
0 [7 Well: Z-23 Depth Range From: 9172.00 To 12249.00 Error System: ISCWSA
11' Wellbore: Z-23C Results Limited By: Centre Distance: 1422.20 Scan Method: Tray. Cylinder North
Reference: Plan: Z-23C WP02 Z-23/Z-23C Error Surface: Elliptical Conic
PIan:Z-23CWP02(Z-232-23C) [ Warning Method: Rules Based
Ground Level: 54.04
Deth Rane. FJ-W Northing Easting Latittude Longitude Slot
p g 9172.00 To 12249.00 0.00 0.00 5959360.030 599459.070 70°1T54.240N 14V11'40.333W
From Colour To MD Sec W MD Inc Azi TVD +N/-S +E/-Dleg TFace VSect
Q100 9172 9420 1 9172.00 62.41 333.74 8797.87 1180.88 -195.25 0.00 0.00 -759.541
Possible Magnetic Interference: 2 9205.78 66.53 331.48 8812.42 120T94 -209.28 13.61 -26.83 -785.21
340 20 9420_9559 3 9235.75 70.17 330.51 8823.48 1232.29 -222.79 12.51 -14.09 -809.09
From KOP to 9,420'MO Z-2369550 - 12249 4 9263.64 73.99 328.98 8832.06 1255.21 -236.16 14.66 -21.10 -832.12
90 5 9280.00 76.74 328.41 8836.19 1268.73 -244.38 17.14 -11.41 -846.01
6 9300.00 78.30 327.49 8840.51 1285.28 -254.74 9.00 -30.00 -863.26
7 9330.00 86.41 320.75 8844.51 1309.33 -272.16 35.00 -40.00 -890.36
9455. 8 9334.00 87.11 319.54 8844.73 1312.39 -274.72 35.00 -60.00 -894.11
320 80 40 9 9554.00 83.51 242.30 8866.03 1351.20 -473.67 35.00 -96.00 -1085.81
10 9634.00 84.27 214.15 8874.72 1298.74 -532.37 35.00 -90.00 -1110.42
11 9884.00 86.78 184.16 8894.67 1065.99 -613.09 12.00 -86.50 -1063.94
12 10064.00 87.01 162.53 8904.53 888.53 -592.37 12.00 -90.00 -957.27
% 13 10364.00 90.51 126.68 8911.23 648.08 -421.44 12.00 -85.00 -689.02
14 10484.00 96.31 113.47 8904.06 588.17 -318.08 12.00 -66.00 -569.55
/ \ \ 15 10634.00 96.00 131.57 8887.86 508.33 -192.87 12.00 90.00 -421.19
6016 10884.00 90.73 101.98 8872.87 397.35 27.46 12.00 -99.00 -174.89
17 11074.00 90.67 124.78 8870.53 322.46 200.70 12.00 90.00 12.58
3001 8 11324.00 93.08 94.86 8862.16 238.68 433.07 12.00 -85.00 255.71
94OU �:\ \ 60 19 11469.00 92.94 77.43 8854.50 248.38 576.98 12.00 -90.00 375.49
_ \ \ 20 11739.00 92.48 109.87 8841.39 231.42 842.54 12.00 90.00 613.95
7 �\ \ 21 11949.00 70.78 96.84 8871.91 183.19 1042.88 12.00 -150.00 811.56
22 12099.00 71.75 77.85 8920.49 189.81 1183.99 12.00 -90.00 930.46
40 23 12249.00 72.67 96.74 8966.69 196.46 1325.89 12.00 90.00 1050.02
-2.3 \ \ZR \ - Depth From Depth To S ey/Plan -- Tool -
j 30 -� 100.02 fi70006 Z23ASrvy1GVD-GC MS(Z-23A) GYD.GC-MS
j �� 6718.00 6748.10 Z-23B Srvy 1lnc+Tr"(Z-23B) INC.TREND
r ,\ 6809.92 9172.00 Z-238 Srvy 2MWD+IFR.MS(Z-23B) MWD+IFR+MS-WOCA
9392 9172.00 12249.00 Z-23CWPo2(Z-23C) MWD
280 ; / 20 Z.23 80 -
10
340 0240 20
�
9349 Z-236
270 9172 90 320 9537 200 40
10 i e 160
% 9497 ��
260' 20 / 100 �� / 120 60
/Z 23A,
30
�9445-
` Z- 3d PbZ/
40�, -23B\,\ 8(
9392
270 9172 1 9
240 50 120 \
40
60 9?
80
70
/ Z�23A
- �
Contactlnfo: SuppodiWe i20" 240\,
240`120 ,, 120
Jose Vazquez-Tech Planner 80 140 LEGEND
G E N D
714478-4339 Cel Phone cREvlenlz, c Evlettlz, cnEv161112 v1 160
907-341-7604 Emergency CHEV1-23.Z-23 v3
YoshaRagbirsingh- SurveyManager 90 Z-23, ZZ-23,Z-23. -23V3v2
907-342-2436 Cel Phone Z-23,Z-23B.Z-23Bv7 220 140
TarStaurdivant- DDCoordinator 200 160 ,- Z-50,Z-50,Z-50 V0 200
907-301-1858 Cd Phone 100
Patrick Rider -MWD Coordinator 180 200 240 160
907-952-3497 Cell Phone
Carl Ulrich- Operations Manager Azimuth from North vs Centre to Centre Separation [10 usft/in] 180
907-382-5534 Cell Phone Azimuth from North [°] vs Centre to Centre Separation [40 usff/in]
North America - ALASKA - BP
Prudhoe Bay
PB Z Pad
Z-23
500292195000
Z -23C
Z -23C WP02
Travelling Cylinder Report
24 May, 2016
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00 usft
Reference Well:
Z-23
Well Error:
0.00 usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02
BP
Travelling Cylinder Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well Z-23
Mean Sea Level
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
Z -23C WP02
Filter type:
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
Interpolation Method:
MD Interval 25.00usft Error Model: ISCWSA
Depth Range:
9,172.00 to 12,249.00usft Scan Method: Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 1,422.20 usft Error Surface: Elliptical Conic
Survey Tool Program
Date 5/23/2016
Offset
From
To
Depth
(usft)
(usft) Survey (Wellbore)
Tool Name
100.02
6,700.06 Z -23A Srvy 1 GYD-GC MS (Z -23A)
GYD-GC-MS
6,718.00
6,748.10 Z -23B Srvy 1 Inc+Trend (Z -23B)
INC+TREND
6,809.92
9,172.00 Z -23B Spry 2 MWD+IFR+MS (Z -23B)
MWD+IFR+MS-WOCA
9,172.00
12,249.00 Z -23C WP02 (Z -23C)
MWD
Casing Points
9 5/8"
9.625
ISummary
Description
Gyrodata gyrocompassing m/s
Inclinometer + known azi trend
MWD + IFR + Multi Station W/O Crustal
MWD - Standard
Measured
Vertical
Offset
Casing
Hole
Depth
Depth
Diameter
Diameter
(usft)
(usft)
Name
(in)
(in)
2,646.36
2,565.10
13 3/8"
13.375
17.500
6,718.00
6,617.71
9 5/8"
9.625
12.250
8,913.00
8,625.81
DRILLING LINER 1
7.000
8.500
12,249.00
8,966.69
2-7/8"
2.875
4.250
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 1:38:04AM Page 2 COMPASS 5000.1 Build 818
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
PB Chev Tr
CHEV181112 - CHEV181112 - CHEV181112
9,480.00
10,906.00
1,009.14
149.43
875.08
Pass - Major Risk
PB Z Pad
Plan Kup Z-106 (27+30) v6 - Plan Z-106 - Plan #4
Out of range
Z-01 - Z-01 - Z-01
Out of range
Z-01 - Z -01A- Z -01A
Out of range
Z-01 - Z-01APB1 - Z-01APB1
Out of range
Z-01 - Z-01APB2 - Z-01APB2
Out of range
Z-01 - Z-01 B- Z-01 B
Out of range
Z-02 - Z-02 - Z-02
Out of range
Z-02 - Z -02A - Z -02A
Out of range
Z-04 - Z-04 - Z-04
Out of range
Z-04 - Z -04A - Z -04A
Out of range
Z-05 - Z-05 - Z-05
Out of range
Z-05 - Z -05A - Z -05A
Out of range
Z-05 - Z-05AP61 - Z-05APB1
Out of range
Z-100 - Z-100 - Z-100
Out of range
Z-101 - Z-101 - Z-101
Out of range
Z-103 - Z-103 - Z-103
Out of range
Z-103 - Z-103PB1 - Z-103PB1
Out of range
Z-103 - Z-103PB2 - Z-103PB2
Out of range
Z-11 - Z-11 - Z-11
Out of range
Z -11 -Z -11A -Z -11A
Out of range
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 1:38:04AM Page 2 COMPASS 5000.1 Build 818
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00 usft
Reference Well:
Z-23
Well Error:
0.00 usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02
Summary
Site Name
Offset Well - Wellbore - Design
PB Z Pad
Z -112 -Z -112-Z-112
Z-112 - Z-112PB1 - Z-112PB1
Z-112 - Z-112PB2 - Z-112PB2
Z-114 - Z-114 - Plan #21 Z-114
Z -114 -Z -114-Z-114
Z -116 -Z -116-Z-116
Z-116 - Z-116PB1 - Z-116PB1
Z-116 - Z-116PB2 - Z-116PB2
Z-118 - Z-118 - Plan #13b Z-118
Z-12 - Z-12 - Z-12
Z-13 - Z-13 - Z-13
Z-13 - Z -13A - Z -13A
Z-13 - Z-13APB1 - Z-13APB1
Z -14 -Z -14-Z-14
Z-14 - Z -14A - Z -14A
Z-14 - Z -14B - Z -14B
Z-15 - Z-15 - Z-15
Z-15 - Z -15A - Z -15A
Z-15 - Z-15APB1 - Z-15APB1
Z-15 - Z-15APB2 - Z-15APB2
Z-17 - Z-17 - Z-17
Z-17 - Z -17A - Z -17A
Z-17 - Z-17AP61 - Z-17APB1
Z-19 - Z-19 - Z-19
Z-19 - Z -19A - Z-1 9A
Z-20 - Z-20 - Z-20
Z-21 - Z-21 - Z-21
Z-21 - Z-21 A- Z-21 A
Z-210 - Z-210 - Z-210
Z-210 - Z-210PB1 - Z-210PB1
Z-22 - Z-22 - Z-22
Z-22 - Z -22A - Z -22A
Z-22 - Z -22B - Z -22B
Z-23 - Z-23 - Z-23
Z-23 - Z -23A - Z -23A
Z-23 - Z-23AL1 XX ( has reports do not delete) - Z
Z-23 - Z -23B - Z -23B
Z-24 - Z-24 - Z-24
Z-25 - Z-25 - Z-25
Z-26 - Z-26 - Z-26
Z-26 - Z -26A - Z -26A
Z-27 - Z-27 - Z-27
Z-28 - Z-28 - Z-28
Z-29 - Z-29 - Z-29
Z-32 - Z-32 - Z-32
Z-32 - Z -32A - Z -32A
Z-32 - Z-328 - Z -32B
Z-32 - Z-32BL1 - Z-32BL1
Z-32 - Z-32BPB1 - Z-32BPB1
Z-32 - Z-32BPB2 - Z-32BPB2
Z-32 - Z -32C - Plan #7b Z -32C apprved
Z-32 - Z -32C - Z -32C
Z-33 - Z-33 - Z-33
BP
Travelling Cylinder Report
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Reference Offset Centre to
Measured Measured Centre
Depth Depth Distance
(usft) (usft) (usft)
11,000.00 8,125.00 1,190.99
9,186.09 9,225.00 145.14
9,480.00 9,550.00 113.17
Well Z-23
Mean Sea Level
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K-Alaska PROD -ANCP1
Offset Datum
No -Go Allowable
Distance Deviation
(usft) from Plan
(usft)
96.01 1,120.56
67.53 79.39
1.21 113.17
Warning
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Pass - Major Risk
Pass - Major Risk
Out of range
Pass - NOERRORS
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 1:38:04AM Page 3 COMPASS 5000.1 Build 81B
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00 usft
Reference Well:
Z-23
Well Error:
0.00 usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02
BP
Travelling Cylinder Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well Z-23
Mean Sea Level
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K-Alaska PROD -ANCP1
Offset Datum
Summary
PB Chev
Tr CHEV181112
CHEV181112
Reference
Offset
Centre to
No -Go
Allowable
-
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design 9
(usft)
(usft)
(usft)
Offset Well Error: 0.00 usft
(usft)
Offset
PB Z Pad
Z-33 - Z -33A - Z -33A
Measured
Vertical
Measured
Vertical
Out of range
Z-39 - Z-39 - Z-39
Toofface+
Offset Wellbore
Centre
Casing -
Centre to
Out of range
Z-39 - Z -39A - Z -39A
Depth
Depth
Depth
Depth
Out of range
Z-50 - Z-50 - Plan #8 Z-50 v6
-N/-S
+E/ -W
Hole Size
Centre
Distance
Out of range
Z-50 - Z-50 - Z-50
10,775 00
8,650.00
1,421.90
84.46
1,340.94
Pass - Major Risk
Z-69 - Z-69 - Z-69
(usft)
(in)
(usft)
(usft)
(usft)
Out of range
Offset Design
PB Chev
Tr CHEV181112
CHEV181112
-
-
- CHEV181112
Offset Site Error: 0.00 usft
Survey Program: 100 -BOSS -GYRO
Rule Assigned: Major Risk
Offset Well Error: 0.00 usft
Reference
Offset
Semi Major Axis
Measured
Vertical
Measured
Vertical
Reference
Offset
Toofface+
Offset Wellbore
Centre
Casing -
Centre to
No Go
Allowable Warning
Depth
Depth
Depth
Depth
Azimuth
-N/-S
+E/ -W
Hole Size
Centre
Distance
Deviation
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°)
(usft)
(usft)
(in)
(usft)
(usft)
(usft)
9,460.00
8,855.30
10,175.00
8,687.96
11.06
206.15
-1.26
2,768.36
-233.58
3.562
1,417.27
195.55
1,242.74 Pass - Major Risk
9,460.00
8,855.30
10,200.00
8,707.36
11.06
207.08
-0.56
2,753.16
-237.78
3.562
1,399.64
195.40
1,226.04 Pass - Major Risk
9,460.00
8,855.30
10,225.00
8,726.71
11.06
208.03
0.16
2,737.92
-242.02
3.562
1,382.19
195.24
1,209.58 Pass - Major Risk
9,460.00
8,855.30
10,250.00
8,746.03
11.06
208.99
0.89
2,722.62
-246.28
3.562
1,364.93
195.10
1,193.36 Pass - Major Risk
9,460.00
8,855.30
10,275.00
8,765.30
11.06
209.94
1.63
2,707.29
-250.57
3.562
1,347.87
194.95
1,177.39 Pass - Major Risk
9,460.00
8,855.30
10,300.00
8,784.53
11.06
210.90
2.40
2,691.91
-254.89
3.562
1,331.02
194.81
1,161.66 Pass - Major Risk
9,460.00
8,855.30
10,325.00
8,803.72
11.06
211.88
3.18
2,676.49
-259.25
3.562
1,314.38
194.64
1,146.25 Pass - Major Risk
9,460.00
8,855.30
10,350.00
8,822.84
11.06
212.86
3.97
2,661.01
-263.69
3.562
1,297.95
194.47
1,131.11 Pass - Major Risk
9,460.00
8,855.30
10,375.00
8,841.91
11.06
213.85
4.79
2,645.48
-268.20
3.562
1,281.74
194.31
1,116.26 Pass - Major Risk
9,460.00
8,855.30
10,400.00
8,860.91
11.06
214.83
5.62
2,629.90
-272.79
3.562
1,265.76
194.15
1,101.71 Pass - Major Risk
9,460.00
8,855.30
10,425.00
8,879.86
11.06
215.85
6.47
2,614:27
-277.46
3.562
1,250.01
193.94
1,087.53 Pass - Major Risk
9,460.00
8,855.30
10,450.00
8,898.74
11.06
216.86
7.34
2,598.59
-282.20
3.562
1,234.51
193.73
1,073.66 Pass - Major Risk
9,460.00
8,855.30
10,475.00
8,917.56
11.06
217.88
8.23
2,582.86
-287.03
3.562
1,219.27
193.54
1,060.12 Pass - Major Risk
9,460.00
8,855.30
10,500.00
8,936.31
11.06
218.89
9.13
2,567.07
-291.94
3.562
1,204.29
193.43
1,046.92 Pass - Major Risk
9,464.40
8,855.78
10,525.00
8,955.02
11.05
219.94
8.68
2,551.25
-296.91
3.562
1,189.53
182.22
1,031.92 Pass - Major Risk
9,465.14
8,855.86
10,550.00
8,973.68
11.05
220.98
9.39
2,535.38
-301.92
3.562
1,175.11
180.24
1,019.06 Pass - Major Risk
9,470.00
8,856.40
10,575.00
8,992.30
11.05
222.03
8.84
2,519.48
-306.96
3.562
1,161.06
168.33
1,004.61 Pass - Major Risk
9,470.00
8,856.40
10,600.00
9,010.87
11.05
223.07
9.83
2,503.53
-312.03
3.562
1,147.26
168.26
992.80 Pass - Major Risk
9,470.00
8,856.40
10,625.00
9,029.40
11.05
224.15
10.84
2,487.55
-317.15
3.562
1,133.78
168.16
981.38 Pass - Major Risk
9,470.00
8,856.40
10,650.00
9,047.87
11.05
225.22
11.87
2,471.51
-322.32
3.562
1,120.64
168.07
970.33 Pass - Major Risk
9,470.00
8,856.40
10,675.00
9,066.28
11.05
226.30
12.92
2,455.42
-327.53
3.562
1,107.84
167.99
959.65 Pass - Major Risk
9,470.00
8,856.40
10,700.00
9,084.63
11.05
227.38
13.99
2,439.28
-332.79
3.562
1,095.40
167.92
949.34 Pass - Major Risk
9,470.00
8,856.40
10,725.00
9,102.93
11.05
228.48
15.09
2,423.09
-338.09
3.562
1,083.33
167.81
939.41 Pass - Major Risk
9,470.00
8,856.40
10,750.00
9,121.19
11.05
229.59
16.20
2,406.86
-343.40
3.562
1,071.66
167.71
929.84 Pass - Major Risk
9,470.00
8,856.40
10,775.00
9,139.41
11.05
230.69
17.34
2,390.60
-348.74
3.562
1,060.41
167.62
920.64 Pass - Major Risk
9,470.00
8,856.40
10,800.00
9,157.59
11.05
231.80
18.51
2,374.29
-354.09
3.562
1,049.58
167.54
911.79 Pass - Major Risk
9,474.93
8,856.95
10,825.00
9,175.75
11.05
232.92
18.14
2,357.99
-359.51
3.562
1,039.14
157.57
901.28 Pass - Major Risk
9,480.00
8,857.52
10,850.00
9,193.93
11.05
233.93
17.76
2,341.73
-365.01
3.562
1,029.35
149.74
891.37 Pass - Major Risk
9,480.00
8,857.52
10,875.00
9,212.10
11.05
234.49
18.99
2,325.47
-370.54
3.562
1,020.00
149.59
883.85 Pass - Major Risk
9,480.00
8,857.52
10,900.00
9,230.27
11.05
235.05
20.23
2,309.22
-376.07
3.562
1,011.18
149.46
876.74 Pass - Major Risk
9,480.00
8,857.52
10,906.00
9,234.63
11.05
235.18
20.53
2,305.32
-377.40
3.562
1,009.14
149.43
875.08 Pass- Major Risk, CC, ES, SF
CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 1:38:04AM Page 4 COMPASS 5000.1 Build 81B
Company:
North America - ALASKA- BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00 usft
Reference Well:
Z-23
Well Error:
0.00 usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02
BP
Travelling Cylinder Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well Z-23
Mean Sea Level
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Offset Design
PB Z Pad - Z-23 - Z-23 Z-23
-
Offset Site Error: 0.110 usft
Survey Program:
111-GYO-GC-MS.
7484 -GCT
-MS
Rule Assigned: Major Risk
9 1
Offset Well Error. 0.00 usft
Reference
Offset
Semi Major Axis
Measured
Vertical
Measured
Vertical
Reference
Offset
Toolface+
Offset Wellbore
Centre
Casing -
Centre to
No Go
Allowable Warning
Depth
Depth
Depth
Depth
Azimuth
-N/-S
+E/ -W
Hole Size
Centre
Distance
Deviation
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(")
(usft)
(usft)
(in)
(usft)
(usft)
(usft)
9,173.23
8,798.44
9,725.00
9,032.25
10.24
10.81
75.73
1,619.57
961.70
4.875
1,259.33
85.41
1,174.89 Pass - Major Risk
9,175.00
8,799.25
9,750.00
9,051.20
10,24
10.87
76.13
1,632.20
972.00
4.875
1,276.81
85.19
1,192.61 Pass - Major Risk
9,183.16
8,802.92
9,775.00
9,070.16
10.26
10.93
76.28
1,644.83
982.29
4.875
1,294.46
84.63
1,210.30 Pass - Major Risk
9,187.90
8,804.99
9,800.00
9,089.12
10.27
10.99
76.55
1,657.46
992.59
4.875
1,312.31
84.30
1,228.31 Pass - Major Risk
9,189.57
8,805.71
9,809.00
9,095.95
10.28
11.02
76.65
1,662.01
996.29
4.875
1,318.78
84.19
1,234.85 Pass - Major Risk
11,000.00
8,871.42
7,725.00
7,480.52
16.91
3.69
105.45
599.61
230.02
9.062
1,414.49
94.10
1,352.07 Pass - Major Risk
11,000.00
8,871.42
7,750.00
7,499.95
16.91
3.75
104.68
613.63
237.12
9.062
1,398.35
94.23
1,335.59 Pass - Major Risk
11,000.00
8,871.42
7,775.00
7,519.38
16.91
3.80
103.88
627.65
244.26
9.062
1,382.48
94.35
1,319.36 Pass - Major Risk
11,000.00
8,871.42
7,800.00
7,538.82
16.91
3.85
103.07
641.64
251.43
9.062
1,366.88
94.45
1,303.38 Pass - Major Risk
11,000.00
8,871.42
7,825.00
7,558.28
16.91
3.88
102.23
655.60
258.62
9.062
1,351.53
94.51
1,287.70 Pass - Major Risk
11,000.00
8,871.42
7,850.00
7,577.76
16.91
3.91
101.38
669.53
265.80
9.062
1,336.45
94.54
1,272.28 Pass - Major Risk
11,000.00
8,871.42
7,875.00
7,597.27
16.91
3.93
100.52
683.42
272.96
9.062
1,321.63
94.55
1,257.12 Pass - Major Risk
11,000.00
8,871.42
7,900.00
7,616.80
16.91
3.97
99.63
697.28
280.13
9.062
1,307.08
94.60
1,242.18 Pass- Major Risk
11,000.00
8,871.42
7,925.00
7,636.36
16.91
4.01
98.72
711.10
287.31
9.062
1,292.83
94.67
1,227.48 Pass - Major Risk
11,000.00
8,871.42
7,950.00
7,655.94
16.91
4.07
97.80
724.86
294.53
9.062
1,278.87
94.79
1,213.02 Pass - Major Risk
11,000.00
8,871.42
7,975.00
7,675.54
16.91
4.13
96.86
738.59
301.77
9.062
1,265.22
94.91
1,198.84 Pass - Major Risk
11,000.00
8,871.42
8,000.00
7,695.16
16.91
4.20
95.89
752.28
309.02
9.062
1,251.90
95.04
1,184.94 Pass - Major Risk
11,000.00
8,871.42
8,025.00
7,714.78
16.91
4.27
94.91
765.96
316.29
9.062
1,238.93
95.20
1,171.36 Pass - Major Risk
11,000.00
8,871.42
8,050.00
7,734.41
16.91
4.36
93.91
779.63
323.57
9.062
1,226.33
95.39
1,158.09 Pass - Major Risk
11,000.00
8,871.42
8,075.00
7,754.02
16.91
4.45
92.88
793.30
330.88
9.062
1,214.13
95.60
1,145.18 Pass - Major Risk
11,000.00
8,871.42
8,100.00
7,773.63
16.91
4.54
91.84
806.97
338.21
9.062
1,202.34
95.80
1,132.67 Pass - Major Risk
11,000.00
8,871.42
8,125.00
7,793.21
16.91
4.63
90.77
820.66
345.56
9.062
1,190.99
96.01
1,120.56 Pass- Major Risk, CC, ES, SF
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 1:38:04AM Page 5 COMPASS 5000.1 Build 81B
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00 usft
Reference Well:
Z-23
Well Error:
0.00 usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02
BP
Travelling Cylinder Report
Local Co-ordinate Reference:
Well Z-23
TVD Reference:
Mean Sea Level
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Output errors are at
1.00 sigma
Database:
EDM R5K- Alaska PROD - ANCP1
Offset TVD Reference:
Offset Datum
Offset Design
PB Z Pad - Z-23 - Z -23A - Z -23A
Offset Site Error: 0.00 usft
Survey Program:
100-GYD-GC-MS
Rule Assigned: Major Risk
Offset Well Error: 0.00 usft
Reference
Offset
Semi Major Axis
Measured
Vertical
Measured
Vertical
Reference
Offset
Toolface +
Offset Wellbore
Centre
Casing -
Centre to
No Go
Allowable Warning
Depth
Depth
Depth
Depth
Azimuth
+NI -S
+E/ -W
Hole Size
Centre
Distance
Deviation
(usft)
(usft)
(usft )
(usft)
(usft)
(usft)
(`)
(usft)
(usft)
(in)
(usft)
(usft)
(usft)
9,186.09
8,804.20
9,225.00
8,826.51
8.66
646
72.62
1,247.91
-68.79
5.625
145.14
67.53
79.39 Pass - Major Risk, CC, ES, SF
9,200.12
8,810.14
9,250.00
8,850.20
8.69
6.51
78.80
1,255.51
-71.31
5.625
150.62
67.55
83.62 Pass - Major Risk
9,213.60
8,815.48
9,275.00
8,873.94
8.72
6.56
84.76
1,262.96
-73.69
5.625
158.50
67.63
90.84 Pass - Major Risk
9,226.39
8,820.22
9,300.00
8,897.75
8.75
6.62
90.32
1,270.25
-75.95
5.625
168.54
67.75
100.77 Pass - Major Risk
9,238.07
8,824.26
9,325.00
8,921.61
8.79
6.66
95.27
1,277.39
-78.08
5.625
180.55
67.86
113.11 Pass - Major Risk
9,248.29
8,827.56
9,350.00
8,945.53
8.81
6.71
99.52
1,284.38
-80.07
5.625
194.30
67.95
127.57 Pass- Major Risk
9,257.70
8,830.38
9,375.00
8,969.50
8.84
6.76
103.21
1,291.23
-81.92
5.625
209.59
68.06
143.71 Pass - Major Risk
9,266.28
8,832.78
9,400.00
8,993.53
8.87
6.81
106.43
1,297.93
-83.63
5.625
226.17
68.18
161.24 Pass - Major Risk
9,275.00
8,835.01
9,425.00
9,017.59
8.90
6.86
109.27
1,304.52
-85.22
5.625
243.85
68.31
179.80 Pass - Major Risk
9,280.00
8,836.19
9,450.00
9,041.67
8.91
6.90
111.81
1,311.06
-86.73
5.625
262.43
68.45
199.54 Pass - Major Risk
9,289.35
8,838.28
9,475.00
9,065.78
8.95
6.95
113.79
1,317.54
-88.16
5.625
281.73
68.60
219.71 Pass - Major Risk
9,297.02
8,839.90
9,500.00
9,089.89
8.97
6.98
115.53
1,324.00
-89.55
5.625
301.60
68.61
241.25 Pass - Major Risk
9,300.00
8,840.51
9,525.00
9,114.00
8.98
7.00
117.19
1,330.46
-90.95
5.625
321.97
68.59
263.46 Pass - Major Risk
9,305.74
8,841.60
9,550.00
9,138.11
9.00
7.03
117.67
1,336.92
-92.34
5.625
342.79
68.00
285.58 Pass - Major Risk
9,310.00
8,842.31
9,575.00
9,162.22
9.02
7.06
118.23
1,343.38
-93.74
5.625
364.06
67.40
308.22 Pass - Major Risk
9,310.00
8,842.31
9,580.00
9,167.04
9.02
7.07
118.48
1,344.67
-94.02
5.625
368.36
67.34
312.89 Pass - Major Risk
10,910.99
8,872.53
8,050.00
7,784.90
14.71
3.32
86.58
748.47
136.65
7.750
1,147.87
76.76
1,094.78 Pass - Major Risk
10,915.47
8,872.47
8,025.00
7,763.25
14.76
3.26
87.93
736.89
141.34
7.750
1,165.24
77.26
1,112.43 Pass - Major Risk
10,920.11
8,872.41
8,000.00
7,741.60
14.81
3.20
89.26
725.33
146.12
7.750
1,182.86
77.78
1,130.33 Pass - Major Risk
10,925.00
8,872.35
7,975.00
7,719.97
14.87
3.14
90.60
713.74
150.90
7.750
1,200.69
78.28
1,148.44 Pass - Major Risk
10,929.69
8,872.29
7,950.00
7,698.37
14.92
3.08
91.90
702.07
155.60
7.750
1,218.69
78.78
1,166.71 Pass - Major Risk
10,934.61
8,872.23
7,925.00
7,676.79
14.98
3.03
93.20
690.31
160.21
7.750
1,236.85
79.29
1,185.13 Pass - Major Risk
10,939.61
8,872.17
7,900.00
7,655.25
15.04
2.97
94.49
678.47
164.73
7.750
1,255.15
79.81
1,203.69 Pass - Major Risk
10,944.71
8,872.10
7,875.00
7,633.71
15.10
2.91
95.77 -
666.59
169.20
7.750
1,273.63
80.33
1,222.41 Pass - Major Risk
10,950.00
8,872.04
7,850.00
7,612.16
15.17
2.B6
97.06
654.72
173.63
7.750
1,292.30
80.86
1,241.31 Pass - Major Risk
10,955.15
8,871.97
7,825.00
7,590.60
15.23
2.80
98.31
642.78
177.84
7.750
1,311.13
81.36
1,260.37 Pass - Major Risk
10,960.29
8,871.91
7,800.00
7,569.04
15.30
2.75
99.55
630.71
181.62
7.750
1,330.08
81.85
1,279.54 Pass- Major Risk
10,965.31
8,871.85
7,775.00
7,547.46
15.36
2.69
100.76
618.52
184.92
7.750
1,349.16
82.33
1,298.85 Pass - Major Risk
10,970.16
8,871.79
7,750.00
7,525.87
15.42
2.63
101.95
606.23
187.69
7.750
1,368.38
82.81
1,318.28 Pass - Major Risk
10,975.00
8,871.72
7,725.00
7,504.27
15.49
2.57
103.13
593.82
189.78
7.750
1,387.70
83.25
1,337.82 Pass - Major Risk
10,979.04
8,871.67
7,700.00
7,482.68
15.54
2.51
104.21
581.28
191.04
7.750
1,407.10
83.62
1,357.44 Pass - Major Risk
CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
512412016 1:38.04AM Page 6 COMPASS 5000.1 Build 81B
BP
Travelling Cylinder Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well Z-23
Project:
Prudhoe Bay
TVD Reference:
Mean Sea Level
Reference Site:
PB Z Pad
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
Site Error:
0.00 usft
North Reference:
True
Reference Well:
Z-23
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00 usft
Output errors are at
1.00 sigma
Reference Wellbore
Z -23C
Database:
EDM R5K- Alaska PROD - ANCP1
Reference Design:
Z -23C WP02
Offset ND Reference:
Offset Datum
Offset Design
PB Z Pad - Z-23 - Z -23B - Z -23B
Offset site Error 0.00 usft
Survey Program:
100-GYD-GC-MS, 6718-INC+TREND,
6810-MWD+IFR+MS-W0CA
Rule Assigned: NOERRORS
Offset Well Error: 0.00 usft
Reference
Offset
Semi Major Axis
Measured
Vertical
Measured
Vertical
Reference
Offset
Toofface +
Offset Wellbore
Centre
Casing -
Centre to
No Go
Allowable Warning
Depth
Depth
Depth
Depth
Azimuth
+N/ -S
+E/ -W
Hole Size
Centre
Distance
Deviation
(usft)
(usft).
(usft)
(usft)
(usft)
(usft)
(I
(usft)
(usft)
(in)
(usft)
(usft)
(usft)
9,175.00
8,799.25
9,175.00
8,799.25
0.03
0.01
-26.47
1,183.27
-196.44
0.000
0.00
0.11
0.00 Pass-NOERRORS
9,200.00
8,810.09
9,200.00
8,810.09
0.07
0.08
-28.14
1,203.28
-206.77
0.000
0.00
0.18
0.00 Pass - NOERRORS
9,225.00
8,819.72
9,225.00
8,819.72
0.19
0.15
-132.25
1,223.51
-217.86
0.000
0.00
0.27
0.00 Pass-NOERRORS
9,250.00
8,828.08
9,250.00
8,828.08
0.33
0.22
-133.37
1,243.98
-229.51
0.000
0.00
0.36
0.00 Pass-NOERRORS
9,275.00
8,835.01
9,275.00
8,835.01
0.49
0.30
-137.80
1,264.59
-241.84
0.000
0.00
0.46
0.00 Pass-NOERRORS
9,300.00
8,840.51
9,300.00
8,840.21
0.67
0.38
-22.95
1,285.36
-254.73
0.000
0.32
0.56
0.32 Pass - NOERRORS
9,324.93
8,844.13
9,325.00
8,843.60
0.88
0.46
34.80
1,306.47
-267.67
0.000
1.80
0.67
1.80 Pass-NOERRORS
9,349.06
8,845.57
9,350.00
8,845.23
1.11
0.54
41.10
1,327.67
-280.81
0.000
6.00
0.78
6.00 Pass - NOERRORS
9,371.67
8,847.07
9,375.00
8,845.47
1.34
0.62
29.46
1,348.62
-294.45
0.000
13.26
0.88
13.26 Pass - NOERRORS
9,392.03
8,848.66
9,400.00
8,845.14
1.59
0.71
20.74
1,369.66
-307.95
0.000
23.83
0.97
23.83 Pass-NOERRORS
9,410.00
8,850.24
9,425.00
8,844.51
1.83
0.80
13.94
1,390.53
-321.70
0.000
36.78
1.04
36.78 Pass-NOERRORS
9,426.20
8,851.79
9,450.00
8,843.66
2.07
0.89
8.12
1,410.91
-336.15
0.000
51.23
1.09
51.23 Pass - NOERRORS
9,440.88
8,853.27
9,475.00
8,842.80
2.30
0.99
3.01
1,430.36
-351.83
0.000
66.34
1.13
66.34 Pass-NOERRORS
9,454.56
8,854.71
9,500.00
8,842.19
2.53
1.10
-1.56
1,448.51
-369.00
0.000
81.58
1.17
81.58 Pass-NOERRORS
9,467.12
8,856.08
9,525.00
8,841.72
2.75
1.21
-5.63
1,465.76
-387.09
0.000
97.37
1.19
97.37 Pass - NOERRORS
9,480.00
8,857.52
9,550.00
8,841.46
2.99
1.33
-9.74
1,481.62
-406.40
0.000
113.17
1.21
113.17 Pass - NOERRORS, CC, ES, SI
9,490.00
8,858.66
9,575.00
8,841.27
3.17
1.46
-12.96
1,496.17
-426.72
0.000
129.02
1.22
129.02 Pass-NOERRORS
9,500.00
8,859.81
9,600.00
8,840.99
3.35
1.59
-16.22
1,509.65
-447.77
0.000
145.17
1.23
145.17 Pass - NOERRORS
9,510.00
8,860.96
9,625.00
8,840.45
3.54
1.74
-19.55
1,522.29
-469.33
0.000
161.76
1.23
161.76 Pass-NOERRORS
9,520.00
8,862.12
9,650.00
8,839.59
3.72
1.89
-22.97
1,533.78
-491.52
0.000
178.50
1.23
178.50 Pass-NOERRORS
9,530.00
8,863.28
9,675.00
8,838.50
3.89
2.04
-26.45
1,543.83
-514.38
0.000
195.11
1.21
195.11 Pass-NOERRORS
9,536.51
8,864.03
9,700.00
8,837.32
4.00
2.21
-28.84
1,552.49
-537.80
0.000
211.56
1.21
211.56 Pass-NOERRORS
9,544.62
8,864.96
9,725.00
8,836.30
4.13
2.39
-31.67
1,559.81
-561.67
0.000
227.90
1.20
227.90 Pass-NOERRORS
9,552.53
8,865.86
9,750.00
8,835.71
4.25
2.57
-34.33
1,565.58
-585.99
0.000
243.91
1.18
243.91 Pass-NOERRORS
9,560.00
8,866.71
9,775.00
8,834.93
4.35
2.76
-36.90
1,569.86
--610.60
0.000
259.68
1.16
259.68 Pass - NOERRORS
9,570.00
8,867.84
9,800.00
8,833.76
4.46
2.95
-40.33
1,573.16
-635.35
0.000
275.64
1.13
275.64 Pass-NOERRORS
9,574.50
8,868.34
9,825.00
8,833.08
4.49
3.16
-41.90
1,575.95
-660.19
0.000
291.93
1.12
291.93 Pass - NOERRORS
9,580.00
8,868.96
9,850.00
8,833.21
4.54
3.39
-43.63
1,577.86
-685.11
0.000
308.29
1.10
308.29 Pass-NOERRORS
9,590.00
8,870.07
9,875.00
8,833.32
4.59
3.62
-46.80
1,578.00
-710.10
0.000
324.10
1.06
324.10 Pass-NOERRORS
9,594.45
8,870.56
9,900.00
8,833.08
4.59
3.87
-48.33
1,576.34
-735.04
0.000
339.29
1.04
339.29 Pass-NOERRORS
9,600.00
8,871.16
9,925.00
8,832.34
4.60
4.11
-50.28
1,573.08
-759.81
0.000
354.08
1.02
354.08 Pass - NOERRORS
9,610.00
8,872.24
9,950.00
8,831 AS
4.58
4.37
-53.67
1,568.35
-784.34
0.000
368.49
0.96
368.49 Pass-NOERRORS
9,613.58
8,872.62
9,975.00
8,830.85
4.56
4.70
-54.97
1,562.78
-808.70
0.000
382.91
0.95
382.91 Pass-NOERRORS
9,620.00
8,873.29
10,000.00
8,831.00
4.53
5.38
-57.04
1,557.37
-833.11
0.000
398.16
0.91
398.16 Pass - NOERRORS
9,625.32
8,873.84
10,025.00
8,831.50
4.49
6.13
-58.72
1,550.59
-857.16
0.000
412.94
0.89
412.94 Pass-NOERRORS
9,630.00
8,874.32
10,050.00
8,832.20
4.46
6.57
-60.17
1,543.12
-881.01
0.000
427.85
0.86
427.85 Pass-NOERRORS
9,638.77
8,875.20
10,075.00
8,832.83
4.39
6.79
-61.94
1,535.07
-904.67
0.000
442.91
0.84
442.91 Pass - NOERRORS
9,650.00
8,876.30
10,100.00
8,833.04
4.31
6.99
-63.20
1,526.76
-928.24
0.000
458.27
0.83
458.27 Pass-NOERRORS
9,658.70
8,877.15
10,125.00
8,832.67
4.24
7.16
-64.23
1,518.84
-951.95
0.000
474.40
0.83
474.40 Pass-NOERRORS
9,668.16
8,878.05
10,150.00
8,832.30
4.17
7.33
-65.34
1,510.72
-975.60
0.000
490.75
0.82
490.75 Pass - NOERRORS
9,675.00
8,878.70
10,175.00
8,832.18
4.13
7.48
-66.12
1,502.65
-999.25
0.000
507.48
0.82
507.48 Pass-NOERRORS
9,686.07
8,879.74
10,200.00
8,833.01
4.05
7.63
-67.25
1,494.92
-1,023.01
0.000
524.70
0.81
524.70 Pass - NOERRORS
9,694.34
8,880.50
10,225.00
8,835.14
4.00
7.77
-67.93
1,487.82
-1,046.88
0.000
542.52
0.82
542.52 Pass-NOERRORS
9,700.00
8,881.01
10,250.00
8,838.59
3.96
7.92
-68.19
1,481.62
-1,070.85
0.000
561.01
0.83
561.01 Pass-NOERRORS
9,709.27
8,881.84
10,275.00
8,843.50
3.91
8.06
-68.71
1,475.91
-1,094.68
0.000
579.75
0.83
579.75 Pass - NOERRORS
9,716.09
8,882.45
10,300.00
8,850.07
3.87
8.20
-68.84
1,470.64
-1,118.22
0.000
598.58
0.83
598.58 Pass - NOERRORS
9,725.00
8,883.23
10,325.00
8,858.22
3.83
8.33
-69.08
1,465.91
-1,141.37
0.000
617.49
0.84
617.49 Pass-NOERRORS
9,725.00
8,883.23
10,350.00
8,867.86
3.83
8.46
-68.24
1,461.79
-1,164.06
0.000
636.46
0.88
636.46 Pass-NOERRORS
CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 1:38.04AM Page 7 COMPASS 5000.1 Build 81B
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00 usft
Reference Well:
Z-23
Well Error:
0.00 usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02
BP
Travelling Cylinder Report
Local Co-ordinate Reference:
Well Z-23
TVD Reference:
Mean Sea Level
MD Reference:
Z -23B @ 81.06usft (Doyon 16)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Output errors are at
1.00 sigma
Database:
EDM R5K - Alaska PROD - ANCP1
Offset TVD Reference:
Offset Datum
Offset Design
PB Z Pad - Z-23 - Z Z
-23B - -23B
Offset Site Error: 0.00 usft
Survey Program: 100-GYD-GC-MS, 671a4NC+TREND,
6810-MWD+IFR+MS-WOCA
Rule Assigned: NOERRORS
Offset Well Error: 0.00 usft
Reference
Offset
Semi Major Axis
Measured
Vertical
Measured
Vertical
Reference
Offset
Toolface+
Offset Wellbore
Centre
Casing -
Centre to
No Go
Allowable Warning
Depth
Depth
Depth
Depth
Azimuth
+N/ -S
+EI -W
Hole Size
Centre
Distance
Deviation
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°)
(usft)
(usft)
(in)
(usft)
(usft)
(usft)
9,733.72
8,883.97
10,375.00
8,878.82
3.79
8.58
-68.29
1,458.14
-1,186.23
0.000
655.36
0.89
655.36 Pass - NOERRORS
9,738.97
8,884.42
10,400.00
8,890.70
3.77
8.70
-67.93
1,454.37
-1,207.90
0.000
674.08
0.91
674.08 Pass-NOERRORS
9,750.00
8,885.34
10,425.00
8,902.82
3.73
8.80
-68.24
1,450.35
-1,229.39
0.000
692.92
0.92
692.92 Pass - NOERRORS
9,750.00
8,885.34
10,450.00
8,914.96
3.73
8.90
-67.39
1,446.17
-1,250.85
0.000
711.84
0.96
711.84 Pass - NOERRORS
9,750.00
8,885.34
10,475.00
8,927.47
3.73
8.99
-66.54
1,442.21
-1,272.12
0.000
731.05
1.00
731.05 Pass-NOERRORS
9,758.30
8,886.01
10,500.00
8,941.08
3.70
9.10
-66.57
1,438.82
-1,292.81
0.000
750.19
0.37
750.19 Pass-NOERRORS
9,762.57
8,886.36
10,525.00
8,955.12
3.69
9.26
-66.16
1,435.30
-1,313.20
0.000
769.35
5.05
769.35 Pass - NOERRORS
9,766.70
8,886.69
10,550.00
8,969.15
3.68
9.42
-65.78
1,431.77
-1,333.58
0.000
788.77
10.38
788.77 Pass - NOERRORS
10,680.00
8,883.40
8,275.00
8,052.04
10.59
0.00
108.59
736.20
-62.08
0.000
875.24
5.38
875.24 Pass-NOERRORS
10,692.57
8,882.31
8,250.00
8,028.80
10.85
0.00
107.73
727.47
-59.08
0.000
895.14
5.43
895.14 Pass-NOERRORS
10,704.58
8,881.32
8,225.00
8,005.60
11.10
0.00
106.93
718.68
-56.06
0.000
915.12
5.48
915.12 Pass - NOERRORS
10,716.05
8,880.42
8,200.00
7,982.41
11.33
0.00
106.20
709.82
-53.03
0.000
935.19
5.53
935.19 Pass-NOERRORS
10,726.98
8,879.61
8,175.00
7,959.25
11.55
0.00
105.52
700.93
-49.99
0.000
955.36
5.57
955.36 Pass - NOERRORS
10,737.40
8,878.88
8,150.00
7,936.09
11.75
0.00
104.90
692.00
-46.95
0.000
975.64
5.60
975.64 Pass - NOERRORS
10,747.33
8,878.21
8,125.00
7,912.96
11.94
0.00
104.32
683.03
-43.91
0.000
996.02
5.63
996.02 Pass-NOERRORS
10,756.80
8,877.61
8,100.00
7,889.84
12.11
0.00
103.80
674.03
-40.86
0.000
1,016.50
5.66
1,016.50 Pass - NOERRORS
10,765.82
8,877.07
8,075.00
7,866.72
12.28
0.00
103.31
665.01
-37.81
0.000
1,037.10
5.69
1,037.10 Pass-NOERRORS
10,774.42
8,876.59
8,050.00
7,843.62
12.44
0.00
102.87
655.96
-34.75
0.000
1,057.80
5.71
1,057.80 Pass - NOERRORS
10,782.62
8,876.15
8,025.00
7,820.52
12.58
0.00
102.46
646.89
-31.69
0.000
1,078.62
5.73
1,078.62 Pass - NOERRORS
10,790.47
8,875.76
8,000.00
7,797.46
12.72
0.00
102.09
637.73
-28.64
0.000
1,099.49
5.75
1,099.49 Pass - NOERRORS
10,798.00
8,875.40
7,975.00
7,774.46
12.86
0.00
101.75
628.41
-25.59
0.000
1,120.40
5.77
1,120.40 Pass-NOERRORS
10,805.21
8,875.08
7,950.00
7,751.52
12.98
0.00
101.45
618.96
-22.56
0.000
1,141.35
5.78
1,141.35 Pass-NOERRORS
10,812.12
8,874.79
7,925.00
7,728.63
13.10
0.00
101.17
609.38
-19.53
0.000
1,162.34
5.79
1,162.34 Pass-NOERRORS
10,818.73
8,874.53
7,900.00
7,705.75
13.21
0.00
100.92
599.77
-16.49
0.000
1,183.42
5.81
1,183.42 Pass - NOERRORS
10,825.04
8,874.30
7,875.00
7,682.87
13.32
0.00
100.69
590.16
-13.44
0.000
1,204.62
5.82
1,204.62 Pass - NOERRORS
10,831.09
8,874.09
7,850.00
7,660.00
13.42
0.00
100.48
580.56
-10.37
0.000
1,225.93
5.82
1,225.93 Pass-NOERRORS
10,836.84
8,873.90
7,825.00
7,637.11
13.51
0.00
100.29
570.98
-7.33
0.000
1,247.36
5.83
1,247.36 Pass-NOERRORS
10,842.18
8,873.74
7,800.00
7,614.16
13.60
0.00
100.14
561.47
-4.46
0.000
1,268.95
5.84
1,268.95 Pass - NOERRORS
10,547.12
8,873.60
7,775.00
7,591.16
13.68
0.00
100.03
552.05
-1.79
0.000
1,290.71
5.84
1,290.71 Pass - NOERRORS
10,851.68
8,873.49
7,750.00
7,568.10
13.75
0.00
99.94
542.72
0.68
0.000
1,312.63
5.85
1,312.63 Pass - NOERRORS
10,855.97
8,873.38
7,725.00
7,545.01
13.82
0.00
99.88
533.42
3.06
0.000
1,334.67
5.87
1,334.67 Pass-NOERRORS
10,860.09
8,873.29
7,700.00
7,521.94
13.88
0.00
99.83
524.11
5.45
0.000
1,356.78
5.88
1,356.78 Pass-NOERRORS
10,864.06
8,873.20
7,675.00
7,498.87
13.94
0.00
99.78
514.77
7.84
0.000
1,378.96
5.89
1,378.96 Pass - NOERRORS
10,867.88
8,873.13
7,650.00
7,475.81
14.00
0.00
99.74
505.41
10.25
0.000
1,401.21
5.90
1,401.21 Pass-NOERRORS
CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5724/2016 1:38:04AM Page 8 COMPASS 5000.1 Build 81B
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00 usft
Reference Well:
Z-23
Well Error:
0.00 usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02
BP
Travelling Cylinder Report
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Well Z-23
Mean Sea Level
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Offset Design
PB Z Pad - Z-50 - Z-50 - Z-50
Offset site Error. U0 usft
Survey Program: 89-GYD-GC-SS, 587-MWD+IFR+MS-WOCA, 3216-INC+TREND, 3310-MWD+IFR+MSWOCA,
6949-MWD+IFR+M: Rule Assigned: Major Risk
Offset Well Error: 0.00 usft
Reference
Offset Semi Major Axis
Measured Vertical
Depth Depth
(usft) (usft)
Measured Vertical Reference Offset
Depth Depth
(usft) (usft) (usft) (usft)
Toolface +
Azimuth
(°)
Offset Wellbore
+N/ -S
(usft)
Centre Casing -
+E/ -W Hole Size
(usft) (in)
Centre to
Centre
(usft)
No Go
Distance
(usft)
Allowable Warning
Deviation
(usft)
10,775.00 8,876.56
8,625.00 8,29921 14.66 7.19
-179.11
-740.62
-636.83 5.687
1422.14
84.26
1,341.68 Pass - Major Risk
10,775.00 8,876.56
8,650.00 8,319.85 14.66 7.25
-178.24
-743.63
-650.60 5.687
1,421.90
84.46
1,340.94 Pass - Major Risk, CC, ES, SF
CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 1:38.04AM Page 9 COMPASS 5000.1 Build 81B
BP
Travelling Cylinder Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Project:
Prudhoe Bay
ND Reference:
Reference Site:
PB Z Pad
MD Reference:
Site Error:
0.00 usft
North Reference:
Reference Well:
Z-23
Survey Calculation Method:
Well Error:
0 00 usft
Output errors are at
Reference Wellbore
Z -23C
Database:
Reference Design:
Z -23C WP02
Offset ND Reference:
Well Z-23
Mean Sea Level
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1 00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
teference Depths are relative to Z -23B @ 81.06usft (Doyon 16) Coordinates are relative to: Z-23
Dffset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04
-entral Meridian is 150' 0' 0.000 W Grid Convergence at Surface is: 0.76 '
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 1:38.04AM Page 10 COMPASS 5000.1 Build 81B
Ladder Plot
1400-
400
1050
1050-
--- - ------ - - --- -
.0
m
CL-- - -
- ------------------
W
-
-------- -'-- --
= 700
m
U
0
C)
350
, .
--------------------------------------------'--
-- - -- ------
:
0
0 2000
4000 6000 8000 10000 12000
Measured Depth
LEGEND
-� CHEV181112,CHEV181112,CHEV181112V1
—F Z-23,Z-23A,Z-23AV2 -$- Z -50,Z -50,Z -50V0
$ Z -23,Z -23,Z -23V3
Z-23,Z-23B,Z-23BV7
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 1:38.04AM Page 10 COMPASS 5000.1 Build 81B
Company:
Project:
Reference Site:
Site Error:
Reference Well:
Well Error:
Reference Wellbore
Reference Design:
North America - ALASKA - BP
Prudhoe Bay
PB Z Pad
0.00 usft
Z-23
0.00 usft
Z -23C
Z -23C WP02
BP
Travelling Cylinder Report
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Well Z-23
Mean Sea Level
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to Z -23B @ 81.06usft (Doyon 16) Coordinates are relative to: Z-23
Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04
Central Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 0.76 °
Separation Factor
Plot
9.00
i
pry{,
- - - - - - - - - - -
cc 6.00—
LL
.00
m
- - - - - - - - - - - - - - - - - - - - -
3.00
- - -
0.00
0 2000 4000 6000 8000 10000
Measured Depth
LEGEND
'.- CHEV181112,CHEV181112,CHEV181112V1 - Z-23,Z-23A,Z-23AV2 -8- Z -50,Z -50,Z -50V0
-0- Z -23,Z -23,Z-23 V3 Z-23,Z-23B,Z-23B V7
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 1:38:04AM Page 11 COMPASS 5000.1 Build 81B
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB Z Pad
Site Error:
0.00 usft
Reference Well:
Z-23
Well Error:
0.00 usft
Reference Wellbore
Z -23C
Reference Design:
Z -23C WP02
BP
Travelling Cylinder Report
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Well Z-23
Mean Sea Level
Z -23B @ 81.06usft (Doyon 16)
True
Minimum Curvature
1.00 sigma
EDM R5K- Alaska PROD - ANCP1
Offset Datum
Ierence Depths are relative to Z -23B @ 81.06usft (Doyon 16) Coordinates are relative to: Z-23
Tset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04
antral Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 0.76 °
Travelling Cylinder
Not
1995
330 30
1710
9460
300
855
570
9739 9594 285
270
l 11000
285
10783
570
855
240 1140
1425
1710 _
210 150
1995
180
Azimuth from North [°] vs Centre to Centre Separation [950 usfUin]
LEGEND
CHEV181112,CFEV181112,CHEV181112V1 -E- Z-23,Z-23A,Z-23AV2
Z-23, Z-23, Z-23 V3 Z-23, Z -23B, Z -23B V7
We
M
120
Z-50, Z-50, Z-50 V0
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
5/24/2016 1:38.04AM Page 12 COMPASS 5000.1 Build 818
NORDIC CTD UNIT # 2 CHOKE / REEL / CIRCULATION MANIFOLD DIAGRAM — q
Cho eP�nel Standpipe 2" Circulation Line
Driller GauOeM10 MMMB Manual Chlke p il calista
CIRCULATING MANIFOLD MM9 MM T6
MM 15
SLB Transducer
MMB PVT Sensor I
MM7 I
MM 13 Baker Choke I
MM 4 MM 17 KILL SIDE MANUAL VALVE CHOKE SIDE
KILL NCR MANUAL VALVE
f Alr Blow down MM 12 MM14 ReV Cir Line \ / CHOKE HCR
MM �w f I
Coiled Tubing Choke Line
I Ba rChoke 101fune e
I
MP2 MP1 4
�- — — — — — — — — — — — J KIII Line I ♦ I
\ BOP 18 I
HP 11 MP 10 Trand}ueers COILED TUBING I BOP17
I CIRCULATING SYSTEM (
MP 14 HP 18
IP 19 HP9 HPB I I
'.siavEres. I
To Inner Reel
HPHP 13 HP7 HPS HP4 HPJ Valve Ii I
H 2 HP2 HP1 II �I
HP 18 cement line N2 SLB .
-
- I
U`17 N2 TriFlow
• CM 85 CHOKE MANIFOLD
Gauge MG5
CM 28
GAS BUSTER
-�1
Test Pump Inlet CM JO "
CMJ
�r
Flow f/ HC HDYGauae PBT
4WaV Block'r
CM14 CM7 .� CMB CM24 Note: L I
CMS CMB C 1T P82 liquid
eg is
Baker Choke Line 10'
from wal PBJ ti high -
CM13 CM7
1
/ CM15 CM2
CM28ei
CM4 CM17 Cern
CM21 I
1
CM25 CM20 CM22 CM23 I
CM26
Tiger Tank I
/ CM16 CUTTINGS BO% I _.
CM2I / CM79 I
/ TIGER TANK I
/ I
�' I
TRANSMITTAL LETTER CHECKLIST
WELL NAME:
PTD: & " � f
i
Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: POOL: �-
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. , API No. 50- - - -
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69)
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
- -� from records, data and logs acquired for well
(name onpermit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT Z -23C _ Program DEV _ Well bore seg ❑
PTD#: 2160810 Company BP EXPLORATION (ALASKA) INC. Initial Class/Type DEV/PEND GeoArea 890 _ _ _ Unit 11650 On/Off Shore On Annular Disposal El
1 Permit fee attached_ - - - - No_
Geologic
2
Lease number appropriate_
Yes -
Entire Well lies within ADL0028262._ - - - - - . -
3
Unique well_ name and number - - -
Yes -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - -
4
Well located in_a_defined_pool - - - - - - -
Yes - - -
PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO -341F - - - - -
5
Well located proper distance from drilling unit_boundary_ _ - - _ - - - - - -
Yes
_ CO 341_F, Rule 2:_ There shall be no restrictions_ as tQ well_ spacing_ except that_nopay shall be - - - - - - - -
6
Well located proper distance. from other wells- - - - - - - - - - - - - - - - - - - - - - - - - - - -
Yes - - -
- - _ - opened in a well closer than 500 feet to -the boundary_ of the -affected -area. Planned well conforms to CO
7
Sufficient acreage_availablein_drillingunit - - - _
Yes_ _ _
_ _ 341 F4 Rule 2-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8
If -deviated, is wellbore plat -included - - - -
Yes -
- _ - -
9
Operator only affected party- - - - - - - - - - -
Yes - -
- - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - -
10
Operator has_ appropriate bond in force - - - _
Yes - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
11
Permit_ can be issued without conservation order_ - - - - - - - - - - - - - - - - - -
Yes_ -
-- --- -- - - - - - - - - - - - -- - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - -
Appr Date
12
Permit can be issued without administrative_ approval - - - - - - - - .
Yes _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - - - - - - - -
13
Can permit be approved before 15-day_wait ------- - - - - - - - - - - - - - - - -
Yes -
- - - - - - -. - - - - - - - - - - - - - - - - - - - - - - - - -
SFD 6/8/2016
14
Well located within area arid -strata authorized by Injection Order # (put 10# in -comments) (For-
NA_
- - . - - - - - -
15
All wells -within 1/4_mile area -of review identified (For service well only) -
NA_ -
- - - - - - - - - - - - - - - - - - - - - - - - - -
16
Pre -produced injector: duration -of pre production less than 3 months_ (FQr service well only)
NA_ -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
17
Nonconven. gas conforms to AS31.05,030(j.1_.A),0 2.A -D)
NA- -
- - - - - - - - - - - - - -
Conductor stringprovided- - - - . ---
NA_
Set in original well Z-23
Engineering
.18
19
Surface casing protects all -known USDWs -
NA_
Set in original well Z-23 -
20
CMT_ vol_ adequate_ to circulate -on conductor & surf_csg . --
NA_
- Set in original well Z-23 - - - - - - - - -
21
CMT_ vol_ adequate_ to tie -in -long string to surf csg_
NA_ _ _ _
_ Set in original well Z-23 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - - -
22
CMT_will cover -all known_productive horizons_ - - - - - - - - - - - -
Yes - - -
_ sidetrack will ce_ment_liner_in place_ _ _
23
Casing designs adequate for C,_T, B &_ permafrost_ _ _ _
Yes - -
- - - - - - - - - - - - - - - - - - - - - - - - -
24
Adequate tankage, or reserve pit
Yes
rig has steel_pits - - - - -
25
If -a- re -drill, has_a 10-403 for abandonment been approved _
Yes _ _ _
_ _ _ _ Sundry -316-318 - - - - - - - - - -- - - - - - - - - - - - - - - - -
26
Adequate wellbore separation _proposed
Yes
proximity_ analysis performed - - - - - - - .
27
If_diverter required, does it meet regulations. _ _ - - - - - -
NA
Wellhead in place, BOPE to be installed
Appr Date
28
_Drilling fluid_ program schematic_& equip -list adequate-
Yes
Max Formation Pressure @_8795' TVDSS is 8,0_ PPG EMW
MJQ 7/6/2016
29
BOPEs,.do they meet regulation - - -
Yes .
- - - - - . -
30
_B_OPE-press rating appropriate; test to -(put prig in comments)_
Yes -
- - - . MASP is 2779 psi, 3500_psig BOPE_test - _ _ - - - -
31
Choke manifold complies w/API_RP-53 (May 84)_
Yes _ _ _
_ - - - - - _
32
Work will occur without operation shutdown_
Yes - - -
- _ - Coil_tubning sidetrack in zone _ - - - - - - - - - -
33
Is presence. of 1-12S gas probable _ -
Yes -
- - - H2S measures required - - - . -
�34
Mechanical -condition of wells within AOR verified (For service well only)
NA_
- - - - - - - - - - - - - - - -- - -
35
Permit_can be issued w/o hydrogen_ sulfide measures
No _ -
_ _ _ _ Z -Pad wells are_H2S-bearing, H2S measures are required. _ -
Geology
36
-Data- presented on potential overpressure zones.
Yes
Planned drilling mud program _(8.4_ppg)_appears _adequate -to control -operator's forecast
Date
37
Seismic_ analysis_ of shallow gas -zones- - - - _ - -- - - - - ..
NA_ - - -
- -- pore pressure -gradient (about 8.0 ppg)._Should higher pore pressures be encountered,- _ -
Appr
SFD 6/8/2016
38
Seabed condition survey -(if off -shore) - - - -
NA_
BP has -immediate access to nearby fluid -mixing facilities..
39
Contact name/phone for weekly. reports_ [exploratory only] --
NA_ -
Geologic
Date:
Engineering
Public
Date Date
Commissioner:
Commissioner:
Commissioner
OTS