Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout205-170• • image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. p2Q ~- 1 ~Q Well History File Identifier Organizing ~dor,e> ^ Two-sided III IIII~I II III II NI ^ Rescan Needed III N~III II II III III RE AN DI TAL DATA OVERSIZED (Scannable) Color Items: Diskettes, No. ~ ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: BY: Maria Date: ~ ~~ ©g ^ Other:: /s/ ~, Project Proofing III IIIIII VIII II III BY: Maria Date: 5 ~ ~ Q 8 /s/ ~~ S i P i ~ d ~ cann ng reparat on x 30 = w + =TOTAL PAGES ~/`7 C d / BY: ~ Maria _ Date: ~~ ' ~~©~ ( ount oes not include cover sheet) /s/ ~ Production Scanning Stage 7 Page Count from Scanned File: (count does include cover sheet) Page Count Matches Number in Scanning Pr paration: _~YES NO BY: Maria Date: ~J `~ ~ ~ /s/ Stage 7 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II IIII I II II I I III ReScanned III IIIIIIIIIII II III BY: Maria Date: /s/ Comments about this file: Quality Checked III II'I~I III III 111 10!6!2005 Well History File Cover Page.doc • ~, 4 ~~ ~~ ~( ,~ ~' ~- ~' ~" "yF ~o: f +~~ y~ rF~ ` 4.,~` r ..MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_M~ker.doc i ~ ~~ DATA SUBMITTAL COMPLIANCE REPORT 5/12/2008 Permit to Drill 2051700 Well Name/No. PRUDHOE BAY UN GRIN V-203L2 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23285-61-00 MD 10605 TVD 4448 Completion Date 2/16/2006 Completion Status 1-OIL REQUIRED INFORMATION Mud Log No Samples No DATA INFORMATION Types Electric or Other Logs Run: MWD / GR / RES / Azimut hal DEN / NEU /AIM / PW D Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Ty Med/Frmt Number Name Scale Media No -- D Asc Directional Survey Directional Survey `ED C Lis 15449 „Kduction/Resistivity '~le~g 15449(~I nduction/Resistivity 2 Blu // (~g 15449~nduction/Resistivity lls~ Blu Well Cores/Samples Information: Name 0 10605 Open 3/20/2006 0 10605 Open 3/20/2006 94 10605 Open 9/28/2007 LIS Veri, GR, ROP, FET, DRHO, NPHI w/PDS and TIF graphics 6832 10605 Open 9/28/2007 MD Vision Service 30-Jan- 2006 6832 10605 Open 9/28/2007 TVD Vision Service 30-Jan- 2006 Interval Start Stop Current Status 1-OIL UIC N Directional Survey e L~-~"""~~~ (data taken from Logs Portion of Master Well Data Maint Interval OH / Start Stop CH Received Comments Sample Set Sent Received Number Comments • ADDITIONAL INFORMP~TION Well Cored? Y 1[`N~J Chips Received? Y'Ttd--~ Analysis ~~ Received? Comments: Compliance Reviewed By: Daily History Received? ~ N Formation Tops ~ N Date: osn7lo~ i • Schlem~erger Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Log Description NO. 4432 Company: Alaska OII 8 Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99507 Field: P. Bay Orion Date BL Color CD W-39 V-215 11216197 40015722 MCNL - OH EDIT MWDILWD V 0/29/06 04!20/07 1 2 7 1 V-203L2 V-203L3 40012957 40012957 OH EDIT MWDILWD OH EDIT MWD/LWD 01130/06 02/05/06 2 2 7 1 V-203L4 40012957 OH EDIT MWDILWD / 02!11/06 2 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGPJIPJG AND ABT ~ RNI G`ON~~h)p`,~'~%t"6H TO: ~ ~; r m 1 z ~, `'~ ~s ~ , 4t BP Exploration (Alaska) Inc. Petrotechnical Dala Center LR2-t 900 E Benson Blvd. ~•, )-- ~ rp n ~ r~ n -7 Anchorage AK 99508-4254 ~a p_-,R („ ~j ! 111 Date Delivered: ~~ h y,., ~.~., / (-S~~I H91~I~'~'~f~ Schiumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503.2838 ATTN: Beth Received by: j ~ECEIVEp ~G ~/~~~a,~ STATE OF ALASKA JUL 2 6 20~AS IL AND GAS CONSERVATION COM~SION Alaska Oil & Gas ConE4L~~OMP LETION OR RECOMPLETION REPORT AND LOG t' Revised: 07/23J06, Put o~n Production AnP{lnrnnn 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zoAAC zs.~os zoAAC zs.»o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 2/16/2006 12. Permit to Drill Number 205-170 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 1/27/2006 13. API Number 50-029-23285-61-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 1/29/2006 14. Well Name and Number: PBU V-203L2 4801 FSL, 1920 FEL, SEC. 11, T11N, R11E, UM Top of Productive Horizon: 2370' FSL, 5213' FEL, SEC. 02, T11 N, R11 E, UM (OBb) 8. KB Elevation (ft): 81.2' 15. Field /Pool(s): Prudhoe Bay Field / Orion Total Depth: 624' FSL, 3966' FEL, SEC. 35, T12N, R11 E, UM 9. Plug Back Depth (MD+TVD) 10605 + 4448 Ft Schrader Bluff 4b. Location of Well (State Base Plane Coordinates): Surface: x- 590381 y- 5970046 Zone- ASP4 10. Total Depth (MD+TVD) 10605 + 4448 Ft 16. Property Designation: ADL 028238 TPI: x- 587051 y_ 5972856 Zone- ASP4 Total Depth: x- 588252 y- 5976403 Zone- ASP4 11. Depth where SSSV set N/A MD 17. Land Use Permit: 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD / GR / RES / Azimuthal DEN ! NEU / AIM I PWD 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MO .SETTING DEPTH TVD HOLE AMOUNT SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" x 34" 215.5# A53 Surface 110' Surface 110' 48" 260 sx Arctic Set A rox. 10-3/4" 45.5# L-80 29' 3435' 29' 2679' 13-1 /2" 625 sx AS Lite 451 sx Class 'G' 7-5/8" 29.7# L-80 26' 2' 26' 4396' 9-7/8" 300 sx Class 'G' 313 sx Class'G' 4-1/2" 12.6# L-80 6770' 10590' 4372' 4447' 6-3/4" Uncemented Slotted Liner 23. Perforations open to Production (MD + TVD of Top and 24. TUBING RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD 4-112" Slotted Section 4-1/2", 12.6#, L-80 6504' 6429' MD TVD MD TVD 6922' - 10545' 4423' - 4446' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT Si KIND OF MATERIAL USED 2775' Freeze Protect w/ 115 Bbls of Diesel 26. PRODUCTION TEST Date First Production: Reported on V-203 Method of Operation (Flowing, Gas Lift, etc.): See V-203 10-407 (Dated 07/25/06, PTD # 205-168) for Production & Test Data Date of Test Hours Tested PRODUCTION FOR TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO FIOW TUbing PreSS. CaSing PreSSUre CALCULATED 24-HOUR RATE OIL-BBL GAS-McF WATER-BBL OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None Form 10-407 Revised 12/2003 ® ONTINUED ON REVERSE SIDE ~ Y!f ~ ~UL ~ 1 ~p06 r i\ I V~ i Y ~~ v 28. , GEOLOGIC MARKE 29. ORMATION TESTS Include and brie summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Schrader Bluff OBb 6832' 4396' None Schrader Bluff OBb 7761' 4400' Schrader Bluff OBb 7857' 4403' Schrader Bluff OBb 8372' 4411' Schrader Bluff OBb 8476' 4412' Schrader Bluff OBb 9991' 4435' Schrader Bluff OBb 10133' 4437' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. ~..~ / // ~~~ ~v Signed Terrie Hubble Title Technical Assistant Date U PBU V-203L2 205-170 Prepared ByName/Number. Terrie Hubble, 564-4628 Well Number Permit No. / A fOV81 NO. Drilling Engineer: SCOtt Kolstad, 564-5347 INSTRUCTIONS GeNewu: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Ire~a 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 1212003 Submit Original Only STATE OF ALASKA ALAS IL AND GAS CONSERVATION COIV~iSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status:®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG 20AAC 25.105 20AAC 25.110 ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1b. Well Class: ® Development D Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 2/16/2006 12. Permit to Drill Number 205-170 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 1/27/2006 13. API Number 50-029-23285-61-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 1/29/2006 14. Well Name and Number: PBU V-203L2 4801 FSL, 1920 FEL, SEC. 11, T11 N, R11 E, UM Top of Productive Horizon: 2370' FSL, 5213' FEL, SEC. 02, T11 N, R11 E, UM (OBb) g. KB Elevation (ft): 81.2' 15. Field /Pool(s): Prudhoe Bay Field / Orion Schrader Bluff Total Depth: 624' FSL, 3966' FEL, SEC. 35, T12N, R11 E, UM 9. Plug Back Depth (MD+TVD) 10605 + 4448 Ft 4b. Location of Well (State Base Plane Coordinates): Surface: x- 590381 y- 5970046 Zone- ASP4 10. Total Depth (MD+TVD) 10605 + 4448 Ft 16. Property Designation: ADL 028238 TPI: x- 587051 y- 5972856 Zone- ASP4 Total Depth: x- 588252 Y- 5976403 Zone- ASP4 11. Depth where SSSV set N/A MD 17. Land Use Permit: T 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. hickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD / GR / RES / Azimuthal DEN / NEU /AIM / PWD 22. ASING, LINER AND EMENTING ECORD CASING ETTING EPTH MD ETTING EPTH'TVD HOLE OUNT SIZE WT. PER FT. GRADE OP OTTOW4 OP OTTOM SIZE CEMENTING RECORD PULLED 20" x 34" 215.5# A53 Surface 110' Surface 110' 48" 260 sx Arctic Set (A rox.) 10-3/4" 45.5# L-80 29' 3435' 29' 2679' 13-1 /2" 625 sx AS Lite, 451 sx Class 'G' 7-5/8" 29.7# L-80 26' 6832' 26' 4396' 9-7/8" 300 sx Class'G', 313 sx Class 'G' 4-1/2" 12.6# L-80 6770' 10590' 4372' 4447' 6-3/4" Uncemented Slotted Liner 23. Perforations open.to Production (MD +TVD of Top and " " 24. TUBING RECORD Bottom Interval, Slze and Number; if none, state none ): SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Section 4-1l2", 12.6#, L-80 6504' 6429' MD TVD MD TVD 6922' - 10545' 4423' - 4446' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT Sc KIND OF MATERIAL USED 2775' Freeze Protect w/ 115 Bbls of Diesel 26• PRODUCTION TEST _ , , Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test Hours Tested PRODUCTION FOR TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CHDK~ SIZE GAS- IL I~C4~d , FIOW TUbing Press. CaSing PreSSUre CALCULATED 24-HOUR RATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APB (GQRR) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None ~ ~~,~ ~~'k ~ ~ 20~~ ~ a ~ G~l:~°it~ (~ ~~ Ma/ .-rte ~~ ~ Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE I ti 28. GEOLOGIC MARKS 29' ORMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Schrader Bluff OBb 6832' 4396' None Schrader Bluff OBb 7761' 4400' Schrader Bluff OBb 7857' 4403' Schrader Bluff OBb 8372' 4411' Schrader Bluff OBb 8476' 4412' Schrader Bluff OBb 9991' 4435' Schrader Bluff OBb 10133' 4437' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. / O~ / Signed Terrie Hubble Title Technical Assistant Date J ~/ d~o PBU V-203L2 205-170 Prepared By Name/Number: Terrie Hubble, 564-462& Well Number Drilling Engineer: Scott Kolstad, 564-5347 Permit No. /Approval No. INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only gp Page 1 of 1 Leak-Off Test Summary Legal Name: V-203 Common Name: V-203 Test Qate Test Type Test_Depth {TMD) Test Depth (TVD) AMW Surface Pressure. Leak Off Pressure (BHP) EMW 1/12/2006 LOT 3,434.0 (ft) 2,677.0 (ft) 8.80 (ppg) 640 (psi) 1,864 (psi) 13.40 (ppg) 1/17/2006 FIT 7,322.0 (ft) 4,525.0 (ft) 9.20 (ppg) 545 (psi) 2,708 (psi) '~ 11.52 (ppg) i Printed: 2/21/2006 10:57:40 AM BP Page 1 of 23 Operations Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task .Code NPT Phase Description of Operations 1/6/2006 12:00 - 12:30 0.50 RIGD P PRE Rig down lines, prep rig floor to lay down derrick. 12:30 - 13:00 0.50 RIGD P PRE Unpin topdrive, rig up bridle line to blocks. 13:00 - 13:30 0.50 RIGD P PRE Rig down pipe shute. 13:30 - 14:00 0.50 RIGD P PRE Lay down derrick. 14:00 - 15:00 1.00 MOB P PRE Move mud pits from L-pad to V-pad. 15:00 - 17:00 2.00 M08 P PRE Move rig off of L-1231 and position at pad entrance. 17:00 - 19:00 2.00 MOB P PRE Rig down diverter lines behind well with crane. Set surface hydril on moving pedestal. Secure bridge crane to BOP stack. 19:00 - 20:30 1.50 MOB P PRE Move rig from L-pad to V-pad. 20:30 - 22:00 1.50 MOB P PRE Position rig to move over V-203. 22:00 -22:30 0.50 MOB P PRE Set matting boards and herculite around well. 22:30 -00:00 1.50 MOB P PRE Spot rig over V-203. 1/7/2006 00:00 - 02:00 2.00 MOB P PRE PJSM with Peak. Spot mud pits. 02:00 - 02:30 0.50 RIGU P PRE Raise and pin derrick. 02:30 - 03:00 0.50 RIGU P PRE Hook up all lines at mud pit interconnect. *Accept rig for operations on V-203 ~ 03:00 1/7/2006. 03:00 - 06:00 3.00 DIVRTR P PRE Rig up diverter lines, take on water in mud pits. 06:00 - 07:30 1.50 RIGU P PRE Bridle down, pin blocks to topdrive, hang bridle lines. 07:30 - 14:00 6.50 DIVRTR P PRE Change out 16" riser air boot to 20" riser adapter. NU riser, install 4" dump valves, berm cellar containment, connect ground strap, winterize cellar walls. Mix spud mud. Prep pipeshed. 14:00 - 15:00 1.00 RIGU P PRE Clean rig. 15:00 - 20:30 5.50 RIGU P PRE Sort all drill pipe in pipeshed and on location due to difference of weight identification grooves on drill pipe. 20:30 -00:00 3.50 RIGU P PRE Pick up 90 jts 4" 15.7# HT-40 drill pipe and stand back in derrick. 1/8/2006 00:00 -00:30 0.50 RIGU P PRE Continue picking up and racking drill pipe in derrick for total of 105 jts, 35 stands. ' Held Pre Spud meeting during the Pre Tour Safety Meeting' 00:30 - 01:00 0.50 R{GU P PRE Pick up BHA tools up beaver slide to rig floor. 01:00 - 02:00 1.00 RIGU P PRE Pick up and stand back 24 jts 4" HT-40 HWDP and JAR/DC stand. 02:00 - 03:30 1.50 DRILL P PRE Pick up used 13.5" bit and BHA #1 and orient MWD and motor. 03:30 -04:00 0.50 DIVRTR P PRE Perform Diverter function test and drill. Witness of test waived by AOGCC rep. Chuck Scheve. Test witnessed by BP WSL R~ert French and NAD TP Brian Tiedemann. 04:00 - 05:00 1.00 RIGU P PRE Rig up Speny Photo Gyro tools and slick line. 05:00 - 05:15 0.25 RIGU P PRE Fill surface stack, check for leaks - OK 05:15 -05:30 0.25 DRILL P SURF Spud well V-203 ®05:15 hr 1/8/2006. Drill directionally from 108' to 171'. 530 gpm, 650 psi, 50 rpm, 1.2K TQ 05:30 - 07:30 2.00 DRILL P SURF CBU, Gyro photo single shot survey ~ 171'. 07:30 -08:00 0.50 DRILL P SURF Drill directionally from 171' to 268'. 530 gpm, 650 psi, 50 rpm, 1.2k TQ 08:00 -09:00 1.00 DRILL P SURF CBU, Gyro photo single shot survey ~ 268'. 09:00 - 10:30 1.50 DRILL P SURF Drill directionally from 268' to 362'. 600 gpm, 760 psi off bot, 900 psi on bottom, 50 rpm, 1.2k TO off bottom, 3.3k TQ on bottom, WOB - 20k, PU - 60k, SO - 58k, RT - 60k. 10:30 - 11:00 0.50 DRILL P SURF Circulate bottoms up for TOH. 600 gpm, 760 psi. MW - 8.8 PPg• 11:00 - 12:00 1.00 DRILL P SURF POOH from 362' to 171' for jar stand. Printed: 2/27/2006 10:57:46 AM BP Page 2 of 23 Operations Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABORS 9ES Rig Number: .Date From - To Hours Task Code NPT Phase Description of Operations 1!8!2006 12:00 - 13:30 1.50 ORILL N RREP SURF Change out mud pump pulsation dampener. (Non Billable NPT Rig Repair - expendable pump parts.) 13:30 - 14:30 1.00 DRILL P SURF Pick up JAR / DC stand and TIH. Washed from 270' to 362'. 14:30 - 15:00 0.50 DRILL P SURF Gyro photo single shot survey ~ 362'. 15:00 - 16:00 1.00 DRILL P SURF Drill directionally from 362' to 454'. 600 gpm, 1260 psi off bot, 1330 psi on bottom, 60 rpm, 3.1 k TO off bottom, 4.7k TO on bottom, WOB - 20k, PU - 72k, SO - 72k, RT - 72k. 16:00 - 17:00 1.00 DRILL N RREP SURF Change out topdrive lubricator pump pressure switch. (1 hr Billable NPT Rig Repair) 17:00 - 17:30 0.50 DRILL P SURF Gyro photo single shot survey ~ 454'. 17:30 - 18:30 1.00 DRILL P SURF Drill directionally from 454' to 546'. 18:30 - 19:00 0.50 DRILL P SURF Gyro photo single shot survey ~ 546'. 19:00 - 23:30 4.50 DRILL P SURF Drill directionally from 546' to 914'. 600 gpm, 1375 psi off bot, 1465 psi on bottom, 60 rpm, 2.1 k TO off bottom, 3.9k TO on bottom, WOB - 20k, PU - 75k, SO - 73k, RT - 75k. ART - 1.73 hrs, AST - 4.38 hrs. 23:30 - 00:00 0.50 DRILL P SURF Gyro photo single shot survey ~ 914'. 1/9/2006 00:00 -06:00 6.00 DRILL P SURF Drill directionally from 914' to 1377'. 600 gpm, 1500 psi off bot, 1800 psi on bottom, 80 rpm, 3k TO off bottom, 6k TO on bottom, WOB - 30k, PU - 85k, SO - SOk, RT - 80k. 06:00 - 06:30 0.50 DRILL P SURF Rig down Sperry photo gyro tools and slickline while circulating. 06:30 - 09:00 2.50 DRILL P SURF Drill directionally from 1377' to 1657'. 600 gpm, 1790 psi off bot, 2100 psi on bottom, 80 rpm, 3k TO off bottom, 6k TO on bottom, WOB - 30k, PU - 90k, SO - 80k, RT - 80k. ART - .75 hrs, AST - 6.38 hrs. 09:00 - 10:30 1.50 DRILL P SURF Circulate bottoms up X 3. 715 gpm, 2330 psi, RPM - 80, TO - 2k, MW - 9.1 PPg• 10:30 - 12:00 1.50 DRILL P SURF POH with BHA #1 from 1657' to 362'. PU - 95k, SO - 75k. 12:00 - 12:30 0.50 DRILL P SURF Stand back JAR / DC stand, lay down UBHO sub. 12:30 - 13:00 0.50 DRILL P SURF Change out bit, adjust motor bend from 1.83 deg to 1.5 deg. 13:00 - 13:30 0.50 DRILL P SURF RIH w/ BHA #2 to 110'. Add STAB in DC stand. 13:30 - 14:00 0.50 DRILL P SURF Service topdrive and crown. 14:00 - 16:00 2.00 DRILL P SURF RIH w/ BHA #2 from 110'. Took weight from 440' to 500', worked pipe through OK. Set down at 708'. Ream out as needed to 1380'. Washed down last stand to bottom. 16:00 -00:00 8.00 DRILL P SURF Drill directionally w/ BHA #2 from 1657' to 2780'. 715 gpm, 3295 psi off bot, 3335 psi on bottom, 80 rpm, 7.1 k TO off bottom, 8.9k TO on bottom, WOB - 35-40k, PU - 103k, SO - 70k, RT - 82k. ART - .75 hrs, AST - 6.38 hrs. 'Encountered Hydrates ~ 2220' and diminished. Hydrates returned at 262T to 2667'.' 1/10/2006 00:00 -03:00 3.00 DRILL P SURF Drill directionally wJ BHA #2 from 2780' to 3444'. 715 gpm, 3440 psi off bot, 3520 psi on bottom, 80 rpm, 4.2k TQ off bottom, 7.2k TO on bottom, WOB - 35-40k, PU - 110k, SO - 70k, RT - 85k. ART - 1.57 hrs, AST - 1.06 hrs. TD 13.5" surface hole - 3,444' ~ 03:00 1/10/2006 03:00 - 04:30 1.50 DRILL P SURF Circulate bottoms up X 3 ~ 700 gpm, 3>380 psi, 100 rpm, 4k TO. MW - 9.6 ppg. 04:30 - 07:30 3.00 DRILL P SURF Monitor well - OK. POH, short trip to HWDP. PU - 110k, SO - 75k. POH from 3444'. Work through tight spot 1~ 3417'. Tight at 1806', pump out from 1939' to 1753' ®60 rpm, 4.5k TQ, Printed: 2/21/2006 70:57:46 AM BP Page 3 of 23 Operations Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6!2006 End: 2/16/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABORS 9ES Rig Number: Date From - To -Hours Task Code: ' NPT Phase Description of Operations 1/10!2006 04:30 - 07:30 3.00 DRILL P SURF 620 gpm, 2040 psi. POH without pumping from 1753' to tight spot ~ 1511'. Pump out from 1568' to 1475' with same parameters. POH without pumping from 1475' to HWDP ~ 1006'. 07:30 - 09:00 1.50 DRILL P SURF RIH from 1006' to 2765'. Set down and pump down from 2765 to 2873' ~ 575 gpm, 2340 psi, 60 rpm, 5k TO. RIH without pumping from 2873'. Wash down last stand. 09:00 - 10:30 1.50 DRILL P SURF Circulate bottoms up X 3 ~ 700 gpm, 3,300 psi, 80 rpm, 4.5k TO. MW - 9.5 ppg. 10:30 - 13:00 2.50 DRILL P SURF Monitor well - OK. POH from 3444' to 1006'. Intermittent drag, 15-25k to 1770'. 13:00 - 13:30 0.50 DRILL P SURF POH with 8 stands HWDP, JAR, DC stand to 110'. 13:30 - 15:00 1.50 DRILL P SURF Lay down BHA #2. 15:00 - 15:30 0.50 DRILL P SURF Clear and clean rig floor. 15:30 - 17:30 2.00 CASE P SURF Rig up to run 10 3/4" casing. Make hanger dummy run. 17:30 - 18:00 0.50 CASE P SURF PJSM for running casing. Pick up shoe joint. Nose cone on shoe broke apart as it was brought up skate. 18:00 - 20:00 2.00 CASE N SFAL SURF Wait on HOWCO float shoe. 20:00 - 00:00 4.00 CASE P SURF Make up and Baker-Lok shoe and float track, check floats - OK. RIH per running detail with 103/4" 45.5# L-80 BTC casing to 1141'. Made up casing to 9000 fUlbs TO, lubricated with BOL NM 2000. Fill each joint with fill-up tool. 1/11/2006 00:00 - 10:30 10.50 CASE P SURF Continue RIH with 103/4" 45.5# L-80 BTC casing from 1141' to 3403". Work through tight hole starting ~ 1997'. Work down 3 jts to 2130' without pumping. Work casing down with pump from 2130' to 3403'. 205 gpm, 415 psi. 10:30 - 11:00 0.50 CASE P SURF Rig down franks fill-up tool. 11:00 - 11:30 0.50 CASE P SURF Land casing on depth ~ 3434'. Make up cementing head. Ran total of 83 jts 103/4" 45.5 L-80 BTC casing Float shoe ~ 3434' 2 jts 10314" 45.5 L-80 BTC casing Float collar ~ 334T 85 jts 10314' 45.5 L-80 BTC casing to surface 11:30 - 13:00 1.50 CEMT P SURF Circulate for surface cement job. Stage up pumps to 8 bpm, 550 psi. Reciprocate casing with full retums. 13:00 - 16:00 3.00 CEMT P SURF Hold PJSM. Line up to SChlumberger and pump 5 bbls of water ahead. Shut down and pressure test the lines to 3,500 psi. Bleed off pressure. Pump 80 bbls of 10.1 ppg Mudpush II spacer at 5 bpm, ICP - 180 psi, FCP -130 psi Shut down, drop bottom plug and batch 10.7 ppg ArcticSet lice lead slurry. Pump 475 bbls of lead cement at 6.7 bpm, ICP - 280 psi, FCP - 330 psi. Batch up 15.8 ppg Class G tail slurry. Pump 93 bbls of tail slurry at 5.3 bpm, ICP -350 psi, FCP -300 psi. Shut down, drop top plug and displace with 10 obis of fresh water. Shut down and swap lines from Schlumberger to the rig. Displace with mud using the rig at 7 bpm, ICP - 150 psi. Dropped rate to 2 bpm, FCP - 500 psi and bumped the plug to 1,500 psi with 313 bbls pumped and 95% efficiency. CIP ~ 16:00 hr 1111/2006. Check floats -holding. Had full retums throughout the cement job. 180 bbls of 10.7 ppg cement returned to surface. Reciprocate casing throughout cement job Printed: 2/21/2006 10:57:46 AM BP ':Page 4 of 23 Operations-Summary Report Legal Wetl Name: V-203 Common Weli Name: V-203 Spud Date: 1!8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABOBS 9ES Rig Number: -Date From - To Hours Task ~ Code NPT Phase - Description of Operations. - 1/11/2006 13:00 - 16:00 3.00 CEMT P SURF until 40 bbls of tail slurry away. 16:00 - 17:00 1.00 CEMT P SURF Rig down Dowell / Schlumberger and casing equipment 17:00 - 20:00 3.00 DIVRTR P SURF Nipple down diverter system. Change out drilling nipple from 20" to 16". Clean under rotary table. 20:00 -00:00 4.00 BOPSU P SURF Nipple up casing head and tubing spool. Test metal to metal seal to 5000 psi - 10 min - OK. Nipple up BOPE 1/12!2006 00:00 -00:30 0.50 BOPSU P SURF Continue nipple up ROPE. 00:30 - 01:30 1.00 BOPSU P SURF Change out topdrive quill, adjust foot. 01:30 - 06:00 4.50 BOPSU P SURF Rig up and test BOPE to 3500 psi high pressure, 250 low pressure. Test witnessed by AOGCC rep Lou Grimaldi, BP WSL Robert French, NAD TP Roy Hunt. Rig down ROPE test equipment. Install wear bushing 06:00 - 07:30 1.50 BOPSU P SURF Service rig and topdrive. 07:30 - 08:00 0.50 BOPSU P SURF Bring BHA tools to rig floor. 08:00 - 12:30 4.50 BOPSU P SURF Pick up 72 jts 4" drill pipe 1 X 1 and stand back in derrick. 12:30 - 15:00 2.50 DRILL P INT1 Pick up and make up 9 7/8" directional BHA #3. Shallow hole test MWD - OK. 15:00 - 16:00 1.00 DRILL P INT1 RIH with BHA #3 picking up drill pipe 1 X 1 to 2110'. 16:00 - 16:30 0.50 DRILL P INT1 Perform benchmark ECD test with Ghost reamer in and out of casing. Incasing - 9.72 ppg, out of casing - 9.60 ppg .12 ppg difference. 16:30 - 18:00 1.50 DRILL P INT1 Continue RIH picking up drill pipe 1 X 1 to 3298'. 18:00 - 19:00 1.00 DRILL P INT1 Pressure test 10 3/4" casing to 3500 psi - 30 minutes - 0 psi loss. 19:00 - 20:15 1.25 DRILL P INTi Wash down from 3298' to top of float collar on depth ~ 3347'. Drill out float collar, cement ,float shoe and rat hole from 3347' to 3444'. 600 gpm, 2400 psi on bottom, 2310 psi off bottom, 60 rpm, 6.2k TO on, 5.1 k TO off. 20:15 - 20:30 0.25 DRILL P INT1 Drill 20' of new hole from 3444' to 3464'. 20:30 - 21:30 1.00 DRILL P INT1 Displace well from 9.4 ppg mud to 8.8 ppg LSNO mud ~ 307 gpm, 520 psi. 21:30 -22:00 0.50 DRILL P INT1 Circulate bottoms up for LOT ~ 700 gpm, 1580 psi. 22:00 - 22:30 0.50 DRILL P INT1 Perform LOT. ND - 2,677', MW - 8.8 ppg, PSI -640 psi, EMW - 13.4 ppg. 22:30 - 23:30 1.00 DRILL P INTi Obtain benchmark ECD's. Base ECD - 9.20 ppg, Max ECD - 10ppg 23:30 -00:00 0.50 DRILL P INT1 Directionally drill 9 7/8" intermediate hole from 3,464' to 3,584'. PU - 120k, SO - 74k, RT - 90k, WOB - 10k, GPM - 700, PSI ON - 1,750, PSI OFF -1,530, RPM - 61, TO ON - 6k, TO OFF - 5.2k, CECD - 9.2 ppg, AECD - 9.34 ppg, AST - 0 hrs, ART - .38 hrs. 1/13/2006 00:00 -22:00 22.00 DRILL P INT1 Directionally drill 9 7/8" intermediate hole from 4,620' to 6,773'. PU - 141k, SO - 101k, RT - 116k, WOB - 10-20k, GPM - 700, PSI ON - 3,210, PSI OFF - 3,080, RPM - 60, TO ON - 10k, TO OFF - 5k, CECD - 9.61 ppg, AECD - 9.97 ppg, AST - 6.75 hrs, ART - 5.77 hrs. 22:00 -00:00 2.00 DRILL P INT1 MadPass log per geologist from 6,773 to 6,400' due to spikes in neutron density logs while drilling through critical OA sands interval. FPH - 400, GPM - 700, PSI - 3,030, RPM - 60, TO - 5k, CECD - 9.61 ppg, AECD - 9.92 ppg, AST - 6.75 hrs, ART - 5.77 hrs. 1114!2006 00:00 -00:30 0.50 DRILL P INT1 RIH from 6,400' to 6,773' after MadPass. PU - 140k, SO 97k. 00:30 -04:45 4.25 DRILL P INT1 Directionally drill 9 7/8' intermediate hole from 6,773" to 7,300' Printed: 2121 Y2006 10:57:46 AM BP Page 5 of 23 Operations Summary Report. Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABOBS 9ES Rig Number: ..Date From - To Hours Task Code NPT Phase Description of Operations 1/14/2006 00:30 -04:45 4.25 DRILL P INTi TD. PU - 137k, SO - 91 k, RT - 114k, WOB - 20k, GPM - 690, PSI ON - 3,400, PSI OFF - 3,200, RPM - 60, TO ON - 7k, TO OFF - 5k, CECD - 9.68 ppg, AECD - i 0.1 ppg. TD 9 7/8" section C~ 04:45 hr 1/14/2006. AST - 2.53 hrs, ART - .60 hrs. Tops: OA - 6,577' OBa - 6,734' OBb - 6,833' OBc - 6,994' OBd - 7, f 80' 04:45 - 06:30 1.75 DRILL P INTi Circulate high viscosity sweep around ~ 690 gpm, 3200 psi, 80 rpm, 7k TQ, CECD - 9.68 ppg, initial AECD - 10.1 ppg, final AECD - 9.93 ppg. MW - 9.2 ppg. 06:30 - 10:30 4.00 DRILL P INTi Monitor well - OK. MadPass log from 7,300' to 6,000'. 655 gpm, 2,985 psi, 70 rpm, 5k TO, PU - 121 k. 10:30 - 13:00 2.50 DRILL P INT1 Backream from 6,000' to 5,190'. 700 gpm, 2,730 psi, 60 rpm, 5k TO. CECD - 9.68, AECD - 10.03 ppg. 13:00 - 14:00 1.00 DRILL P INT1 POH without pumping from 5,190' to 3,298'. No drag, no problems. PU - 125k, SO - 75k. 14:00 - 15:00 1.00 DRILL P INT1 Circulate high viscosity sweep around @ 700 gpm, 2730 psi, 60 rpm, 3k TO. 15:00 - 16:00 1.00 DRILL P INT1 Cut and slip drilling line 78'. 16:00 - 16:30 0.50 DRILL P INT1 Service topdrive, crown and traveling blocks. 16:30 - 18:00 1.50 DRILL P INT1 POH from 3,298' to 260'. PU - 100k, SO - 75k ~ shoe. 18:00 - 20:00 2.00 DRILL P INT1 PJSM with SLB MWD on nucleur source. Laydown BHA #4. 20:00 - 21:00 1.00 DRILL P INTt Clear and clean rig floor. 21:00 -22:00 22:00 - 23:50 1.00 1.83 CASE CASE P P INT1 INT1 Pull wear bushing, flush stack, install test plug. Change upper pipe rams from 3.5" x 6' VBRs to 75/8". Test ram door seals to 3,500 psi - OK. 23:50 -00:00 0.17 CASE P INT1 Rig up to run 7 5/8" casing. Change out bales, rig up casing fill-up tool. 1/15/2006 00:00 -00:30 0.50 CASE P INT1 Finish rigging up to run casing. 00:30 -09:00 8.50 CASE P INT1 PJSM on running casing. Make up shoe track, Baker-Lok same to one joint above float coflar. Checked floats - OK. Continue RIH to 3,415' per running detail with 7 5/8' 29.7# L-80 BTC/STL casing. 10k ffnbs MU TO on BTC using Best O Life 2000 NM lubricant. 5.6k fUlbs MU TQ on STL using Jet Lube Seal Guard. Fill each joint, break circulation every 10 joints for 5 minutes in casing. RIH ~ 80 fpm in casing with correct displacement. 09:00 -09:30 0.50 CASE P INT1 Circulate 1.5 limes annulus volume by staging pumps up to 7 bpm, 480 psi. PU - 129k, SO 103k. 09:30 - 16:30 7.00 CASE P INT1 Continue RIH ~ 40 fpm with 75/8' casing from 3,415' to 5,579'. Break circulation every 5 joints, circulate 10 min every 15 joints. 16:30 - 18:30 2.00 CASE N RREP INT1 Circulate and reciprocate pipe while repairing casing hydraulic power unit ~ 4.7 bpm, 390 psi. 18:30 -22:30 4.00 CASE P INT1 Continue RIH ~ 40 fpm with 7 518" casing from 5,579' to landing depth of 7,291'. Break circulation every 5 joints, circulate 10 min every 15 joints. No mud lost during entire trip in hole. Printed: 2/21/2006 10:57:48 AM gp Page 6 of 23 Operations Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABORS 9ES Rig Number: Date- From - To Hours Task Code NPT I Phase Description of Operations 1/15/2006 18:30 - 22:30 4.00 CASE P INT1 Ran total of 76 jts (includes 4 RA marker joints) 7 5/8" 29.7# L-80 BTC-M casing, 106 jts 7 5/8" 29.7# L-80 STL casing 1 X-over jt 7 5/8" STL box XBTC-M pin 2 BTC-M pup joints 1 STL pup joints. Shoe ~ 7,291' Tops: OBd RA tag ~ 7,046' FC ~ 7,208' OBb RA tag ~ 6,784' OBa RA tag ~ 6,687' OA RA tag ~ 6,524' 22:30 - 23:00 0.50 CASE P INTi Rig down casing fill-up tool, rig up casing cementing head. 23:00 -00:00 1.00 CASE P INTt Break circulation and stage up pumps from 2 bpm, 220 psi to 7 bpm, 540 psi. Reciprocate casing with full returns. PU - 200k, SO - 110k. 1/16/2006 00:00 - 02:00 2.00 CASE P INT1 Continue circulate and reciprocate 7 5/8" casing. 7 bpm 560 psi PU - 200k, SO - 110k. Held cement PJSM while circulating. Had full returns during circulation. 02:00 -04:00 2.00 CEMT P INT1 Switch to Dowell. Pump 5 bbls H2O. Shut down. Pressure test surface cementing lines to 4,000 psi - OK. Pump 20 bbls CW-i00 followed by 40 bbls 10.5 ppg MudPush Spacer. Shut down. Drop bottom plug and pump 64.1 bbl 15.8 ppg 'G" Durablend batched mixed lead cement ~ 5.2 bpm, 350 psi. Switch tanks and pump 54 bbls 16.3 ppg "G" Durastone batched mixed tail cement ~ 5.2 bpm, 200 psi. Shut down, drop top plug and kick out with 10 bbls H2O. Shut down, switch to rig pumps and pump 310 bbls of seawater ®ICP - 7 bpm, 150 psi, FCP - 7 bpm,1,475 psi. Stow pumps down to 3 bpm, 1200 psi. Bump plug with calculated displacement of 321 bbls ~ 95% with 2,000 psi. Bleed pressure off. Check floats - OK. Bumped plug ~ 04:00 hr 1116/2006. Had full returns throughout job. Stopped pipe reciprocation with 293 bbls of seawater away. 04:00 -06:00 2.00 CEMT P INT1 Blow down surface lines. Rig down Dowell and casing running equipment. Lay down landing joint, change out bails. 06:00 - 07:00 1.00 WHSUR P iNT1 Install 7 5/8" x 103/4' packoff. Test same to 5,000 psi - 10 min - OK. 07:00 - 08:00 1.00 BOPSU P INT1 Change out top pipe rams from 75/8' to 3.5" x 6" VBRs. Test door seals to 3,500 psi - OK. 08:00 - 08:30 0.50 WHSUR P INT1 Pull test plug, install wear bushing. 08:30 -09:00 0.50 DRILL P PROD1 Pick up BHA tools from beaver slide. 09:00 -10:00 1.00 EVAL P PRODi Perform 75/8" annulus infectivity test. 2 bpm - 800 psi, 3 bpm - 850 psi, 4 bpm - 900 psi, 4 bpm -900 psi, 5 bpm -900 psi. Leak off pressure - 700 psi, EMW - 14.2 ppg. 10:00 - 13:00 3.00 DRILL P PROD1 PJSM on BHA and nuclear source. Make up 6.75" directional drilling assembly. (BHA #4} 13:00 - 14:00 1.00 DRILL P PROD1 RIH with BHA fd4 on drill pipe to 500'. 14:00 - 15:00 1.00 DRILL P PRODi Inject 115 bbls 9.2 ppg mud down 7 518" x 103/4" annulus ~ 2.5 BPM, 800 psi, SIP -640 psi. 15:00 - 16:00 1.00 DRILL P PROD1 LRHOS freeze protect 7518" annulus with 85 bbls 70 deg dead Printed: 2/27/2006 70:57:46 AM BP Page 7 of 23 Opelratiolns Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABORS 9ES Rig Number: -Date From - To Hotars Task 'Code NPT Phase Description of Operations 1/16/2006 15:00 - 16:00 1.00 DRILL P PROD1 crude ~ 2.5 bpm, ICP - 800 psi, FCP - 1,000 psi, SIP - 960 psi. 16:00 - 19:00 3.00 DRILL P PROD1 RIH with BHA #4 picking up drill pipe 1 X 1 to 2,450'. Set down firm on obstruction in casing at 2,450'. 19:00 - 20:00 1.00 DRILL N DPRB PROD1 Circulate air out of lines, rig up and test 7 5/8" casing 3,500 psi - 10 minutes - OK. 20:00 - 20:30 0.50 DRILL N DPRB PR001 Attempt to work past obstruction without pumping by orienting pipe in 90 deg increments and setting down without success. 20:30 - 22:00 1.50 DRILL N DPRB PROD1 POH with BHA #4 from 2,450' to 328'. 22:00 -00:00 2.00 DRILL N DPRB PROD1 PJSM on BHA and nuclear source. Stand back 6.75" directional drilling assembly. (BHA #4). Break bit and laydown motor. 1/17/2006 00:00 - 01:00 1.00 DRILL N DPRB PROD1 Pick up and make up 6 1/8" flat bottom mill, 6.75" string mill, bumper sub, oil jars. 01:00 - 02:00 1.00 DRILL N DPRB PROD1 RIH with milling assembly to 2,400'. 02:00 - 02:45 0.75 DRILL N DPRB PROD1 Fill pipe and wash down to 2,450 without rotating. 130 gpm, 100 psi. PU - 82k, SO - 72k. Tag up on obstruction ~ 2,450' with 10k, pick up and start rotating down with 50 rpm 2.Sk TO. Mill on obstruction briefly with weight and torque increase indication then fell through. Work area several times to confirm cleanout with 100 rpms, 76k RW, 2.8k TO. 02:45 - 03:00 0.25 DRILL N DPRB PROD1 Conduct brief casing test to confirm integrity to 3,500 psi - OK. 03:00 -04:30 1.50 DRILL N DPRB PRODi RIH from 2,450' to 4,270' (into top of BTC-M casing). No problems. 04:30 -06:30 2.00 DRILL N DPRB PROD1 Monitor well -stable. POH standing back 4" DP and HWDP from 4,270' to 34'. 06:30 - 07:30 1.00 DRILL N DPRB PROD1 LD String Mill BHA from 34'. Clear and clean the floor. 07:30 - 10:00 2.50 DRILL N DPRB PROD1 PJSM for PU BHA and Nuclear Source Tool. PU BHA#5 and RIH on 4' DP to 2,498'. BHA #5: 6.75" DS146H+GJUW, 4.75" AIM motor - 4R/5S - 6 stg - 1.5 bend, bypass sub w/float, nm stab, MWD/LWD, PWD, ADN, 2 x nm flex dc, circ sub, xo, 1 x 4" DP, jars. 10:00 - 10:30 0.50 DRILL P PRODi Shallow test the MWD/LWD tools • good. 10:30 - 13:00 2.50 DRILL P PROD1 RIH with BHA #5 with 4' DP and HWDP to 6,790'. 13:00 -15:00 2.00 DRILL P PROD1 MAD pass for log correlation and tie in from 6,790' to 7,135' - 295 gpm, 1,600 psi, PU - 145k, SO - 90k. 15:00 - 15:30 0.50 CASE P INTi Pressure test the 7-5/8" 29.7# L-80 BTC casing to 3,500 psi - chart and hold for 30 minutes -good. 15:30 - 16:30 1.00 DRILL P PROD1 Continue MAD pass for log correlation and tie in from 7,135' and tag up on float collar at 7,208'- 295 gpm, 1,600 psi, PU - 145k, SO - 90k. 16:30 - 17:30 1.00 DRILL P PROD1 Drill shoe tract from 7,208' to 7,285' - 275 gpm, 1,560 psi, 60 rpm, 7k TQ. 17:30 -19:00 1.50 DRILL P PROD1 Displace the well over to 9.2 ppg MOBM. Pump 55 bbl surfactant spacer folbwed by MOBM - 285 gpm, 2,540 psi, 60 rpm, 6k TQ. 19:00 - 19:30 0.50 GRILL P PROD1 Grill out float shoe, rat hole arui 22' of new formation to 7,322' - PU - 135k, SO - 90k, 295 gpm, 2,890 psi 19:30 - 20:00 0.50 DRILL P PROD1 Pull the BHA inside the 7-5/8" casing and circulate a bottoms up -295 gpm, 2,660 psi, 60 rpm. 20:00 -20:30 0.50 DRILL P PROD1 Perform FIT to 11.52 ppg EMW with 545 psi surface pressure and 4,525' TVD -good. 20:30 - 21:00 0.50 DRILL P PROD1 Obtain benchmark ECD's - 10.29 ppg ROT, 10.08 w/o ROT. Printed: 2/21/2006 10:57:46 AM gP Page 8 of 23 Operations Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/i6/2006 Rig Name: NABOBS 9ES Rig Number: Da#e From - To Hours Task Code NPT Phase Description of Operations 1/17/2006 21:00 -00:00 3.00 DRILL P PROD1 Drill 6-3/4" directionally from 7,322' to 7,415' - PU - 135k, SO - 90k, ROT - 110k, 295 gpm, 2,670 psi off, 2,910 psi on, 60 rpm, 5k TO off, 6k TO on -taking surveys every 30'. CECD - 10.28, AECD - 10.38, ART - 0.09, AST - 0.9 1/18/2006 00:00 - 05:00 5.00 DRILL P PROD1 Drill 6-3/4" directionally from 7,415' to 7,975' - PU - 136k, SO - 81k, ROT - 105k, 290 gpm, 2,730 psi off, 3,160 psi on, 60 rpm, 5.2k TO off, 6.2k TO on, AST - 1.6, ART - 1.6, CECD - 10.35, AECD - 10.7 -taking surveys every 30'. 05:00 - 06:00 1.00 DRILL N DFAL PROD1 Lost communication with the AIM motor. Circulate bottoms up prior to tripping out of the hole for new AIM motor - 290 gpm, 2,730 psi. Final AECD - 10.39 ppg EMW. 06:00 - 11:30 5.50 DRILL N DFAL PROD1 Monitor well -stable. Pump dry job and POH standing back the 4" DP and HWDP from 7,975' to BHA#5 at 234'. 11:30 - 12:30 1.00 DRILL N DFAL PROD1 PJSM for laying down the BHA and removing nuclear Source. LD BHA#5. 6-3/4' DS146 graded 0-0-WT-A-X-I-NO-DTF 12:30 - 13:00 0.50 DRILL N DFAL PROD1 Clear and clean the rig floor. 13:00 - 13:30 0.50 DRILL P PROD1 Service/lubricate the top drive and the rig. 13:30 - 14:30 1.00 DRILL N DFAL PROD1 PJSM for MU BHA #6 and handling nuclear source. MU BHA #6 with new AIM motor, orient and load nuclear source and RIH to 234'. BHA #6: 6.75" DS146H+GJUW-RR, 4.75" AIM motor - 4R/5S - 6 stg - 1.5 bend, bypass sub w/float, nm stab, MWD/LWD, PWD, ADN, 2 x nm flex dc, circ sub, xo, 1 x 4" DP, jars. 14:30 - 18:00 3.50 DRILL N DFAL PROD1 RIH with BHA #6 on 4" DP from 234' to 1,177'. Shallow test the MWD/LWD -good. Continue RIH with 4" DP and HWDP from 1,177' to 7,229' filling pipe at 4,021' and 7,229'. 18:00 - 19:00 1.00 DRILL P PROD1 Cut and slip 65' of drilling line. 19:00 - 19:30 0.50 DRILL N DFAL PROD1 RIH from 7,229' to 7,884'. Precautionary wash and ream down to 7,975'. 19:30 -00:00 4.50 DRILL P PROD1 Drill 6-314' directionally from 7,975' to 8,255' - PU - 143k, SO - 78k, ROT - 104k, 300 gpm, 2,950 psi off, 3,155 psi on, 60 rpm, 5.6k TO off, 6.2k TO on, AST - 0.45, ART - 0.8, CECD - 10.35, AECD - 10.78 -taking surveys every 30'. 1/19/2006 00:00 - 12:00 12.00 DRILL P PROD1 Drill 6-314" directionally from 8,255' to 9,375' - PU - 140k, SO - 79k, ROT - 104k, 290 gpm, 2,840 psi off, 3,100 psi on, 60 rpm, 7k TO off, 8k TQ on, AST - 1.72, ART - 3.15, CECD - 10.64, AECD - 10.73, taking surveys every 30'. 12:00 - 23:00 11.00 DRILL P PROD1 Drill 6-3/4" directionally from 9,375' to 10,620' - PU - 150k, SO - 74k, ROT - 106k, 290 gpm, 2,950 psi off, 3,175 psi on, 60 rpm, 8.3k TO off, 9k TQ on, AST - 0.16, ART - 3.38, CECD - 10.7, AECD -10.98, taking surveys every 30'. 23:00 -00:00 1.00 DRILL P PRODi Circulate open hole ~rolume into the casing prior to backreamiMAD pass to the previous casing shoe. Monitor the well -stable. 1/20/2006 00:00 - 11:00 11.00 DRILL P PROD1 Backream/MAD Pass to 7,320' - 290 gpm, 600 fph max, 2,980 psi, CECD - 10.7, AECD -10.79. 11:00 -11:30 0.50 DRILL P PROD1 Service the top drive and lubricate rig components. 11:30 - 13:30 2.00 DRILL P PRODi RIH without problems from 7,320' to 10,620'. 13:30 - 14:30 1.00 DRILL P PROD1 Circulate bottoms up and displace the well over to 9.2 ppg SF MOBM - 290 gpm, 2,800 psi. 14:30 - 17:30 3.00 DRILL P PROD1 Monitor the well -stable. POH from 10,620' to 7,291' - PU - 154k, SO - 74k. 17:30 - 18:30 1.00 DRILL P PROD1 Drop bar and open up the circ sub. Circulate a bottoms up - Printed: 2Y21/2006 10:57:48 AM BP Page 9 of 23 Operations Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours -Task Code NPT Phase Description of Operations 1/20/2006 17:30 - 18:30 1.00 DRILL P PROD1 392 gpm, 2,375 psi. 18:30 - 22:00 3.50 DRILL P PROD1 Monitor the well -stable. Pump a solids free dry job and POH from 7,291' to the top of the BHA at 235'. 22:00 - 00:00 2.00 DRILL P PRODi PJSM for removing nulclear source and laying down BHA. LD BHA #6 from 235'. Clear and clean the floor - RU to run liner. 6-3/4" DS146 RR graded: 0-1-CT-G-X-I-NO-TD. 1/21/2006 00:00 -04:30 4.50 CASE P RUNPRD PJSM for running liner. PU and RIH with 4-1/2" 12.6# L-80 BTC Slotted -1ST Solid Liner as per program. PU a total of 58 joints of slotted, 13 joints of solid liner, 2 swell packer assemblies (4 rigid centralizers) and Weatherford Aluminum Billet. 04:30 - 13:00 8.50 CASE P RUNPRD XO and RIH with OBc liner on 4" DP and HWDP -filling each stand. 13:00 - 13:30 0.50 CASE P RUNPRD Tag bottom at 10,620' - PU - 160K, SO - 68K. Establish circulation at 1 bpm and observe returns at surface. Set down 10K and bring the rate up to 3 bpm to release the "G° spear from the aluminum billet. 13:30 - 14:00 0.50 CASE P RUNPRD POH to the 7-5/8" casing shoe at 7,289'. 14:00 - 14:30 0.50 CASE P RUNPRD Circulate bottoms up. Monitor the well -stable. Pump solids free dry job. 14:30 - 17:30 3.00 CASE P RUNPRD POH standing back the 4" DP and HWDP from 7,289'. Break out and LD the °G" spear. Function the rams. 17:30 - 18:30 1.00 CASE P RUNPRD Change out the quill on the top drive. 18:30 - 20:30 2.00 DRILL P PROD2 PJSM for PU BHA and loading nuclear source. MU BHA #7 to 235'. BHA #7: 6.75" DS146H+GJUW-RR, 4.75' AIM motor - 4R/SS - 6 stg - 1.5 bend, bypass sub w/float, nm stab, MWD/LWD, PWD, ADN, 2 x nm flex dc, circ sub, xo, 1 x 4' DP, jars. 20:30 - 21:00 0.50 DRILL P PROD2 RIH with 4" DP to 1,300'. 21:00 - 21:30 0.50 DRILL P PROD2 Shallow test the MWDJLWD - 290 gpm, 1,850 psi -good. 21:30 -00:00 2.50 DRILL P PROD2 RIH with 4" DP and HWDP to 7,230'. 1/22/2006 00:00 - 01:00 1.00 DRILL P PROD2 Service the top drive and lubricate the rig. Cut and slip drilling line. 01:00 - 01:30 0.50 DRILL P PROD2 RIH and tag the top of the aluminum billet at 7,690'. 01:30 - 02:30 1.00 DRILL P PROD2 Putl up above the top of the billet and circulate and condition the 9.2 ppg SF MOBM for displacement to 9.2 ppg MOBM. 02:30 -04:00 1.50 DRILL P PROD2 Displace the well over to 9.2 ppg MOBM. Work the pipe during displacement to dig a trench to aid in the KO of the billet. 04:00 -06:00 2.00 DRILL P PROD2 Time drill off the top of the aluminum billet from 7,690' to 7,704' 06:00 - 12:00 6.00 DRILL P PROD2 Dri116-3/4' directionally from 7,704' to 8,348' - PU - 132k, SO - 83k, ROT - 100k, 290 gpm, 2,625 psi off, 3,000 psi on, 60 rpm, 4k TO off, 7k TO on, AST - 3.18, ART - 1.5, CECD - 10.24, AECD - 10.6, taking surveys every 30', backreaming each stand. 12:00 -00:00 12.00 DRILL P PROD2 Drill 6-3/4" directionally from 8,348' to 9,937'- PU - 149k, SO - 56k, ROT - 96k, 290 gpm, 2,910 psi off, 3,200 psi on, 60 rpm, 6.4k TQ off, 7.3k TO on, AST - 1.76, ART - 3.52, CECD - 10.63, AECD - 11.02, taking surveys every 30', backreaming each stand. 1/23/2006 00:00 -04:15 4.25 DRILL P PROD2 Drli 6-3/4" directionally from 9,937' to 10,621' (TD) - PU - 149k, SO - 56k, ROT - 96k, 290 gpm, 2,910 psi off, 3,200 psi on, 60 rpm, 6.4k TO off, 7.3k TQ on, taking surveys every 30', backreaming each stand. ART = 1.74 Hrs. AST = 0.28 Hrs Printed: 2/21/2006 10:57:48 AM gp Page 10 of 23 Operations-.Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/612006 End: 2/16/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABOBS 9ES Rig Number: Date From- To: 'Hours Task Code NPT Phase Description of Operations 1/23/2006 00:00 -04:15 4.25 DRILL P PROD2 CECD = 10.86 AECD = 11.25 04:15 - 11:00 6.75 DRILL P PROD2 Circulate OH volume into the casing. Backream/MAD pass out of the hole ~ 600 FPH to 8,534'. Phase 3 called for GPB. 11:00 - 00:00 13.00 DRILL N WAIT PROD2 Crew changed w/ loader (Discussed w/ HSE rep and IMT who approved plan) Safety Mtg w/crew. POH to shoe. Shut down operation and wait on weather. 1/24/2006 00:00 - 05:30 5.50 GRILL N WAIT PROD2 Still in Phase 3 -Operations suspended -Wait on Weather. Crew changed w/ loader (Discussed w/HSE rep and IMT who approved plan ). Circulate across the top of the hole to ensure full. 05:30 - 08:00 2.50 DRILL N WAIT PROD2 Continue to wait on weather. Conditions changed to Phase 2 on the Spine road and Phase 3 on Access roads and pads. Get personnel and trucks back to location with convoys. 08:00 - 08:30 0.50 DRILL N WAIT PROD2 Circulate bottoms up at the 7-5/8" shoe - 285 gpm, 2,780 psi. 08:30 - 09:30 1.00 DRILL N WAIT PROD2 Orient -90 LHS and RIH from 7,230' to 8,640'. 09:30 - 12:00 2.50 DRILL P PROD2 Backream /MAD pass from 8,640' to 7,900' - 285 gpm, 2,780 psi, 60 rpm, 5k TO, <600 fph. 12:00 - 13:00 1.00 DRILL P PROD2 POH from 7,900' to 7,230' -inside the 7-5/8" casing shoe. 13:00 - 13:30 0.50 DRILL P PROD2 Service the top drive, blocks and crown. 13:30 - 15:00 1.50 DRILL P PROD2 Orient -90 LHS and RIH from 7,230' to 10,621'. 15:00 - 17:30 2.50 DRILL P PROD2 Circulate bottoms up and displace the well over to 9.2 ppg SF MOBM - 290 gpm, 3,000 psi, 60 rpm, 5.7k TO, CECD - 10.85, AECD - 11.07. 17:30 - 19:30 2.00 DRILL P PROD2 Monitor the well -stable. POH to 7,292' -circ sub inside the casing shoe, leaving the bii outside. 19:30 - 20:30 1.00 DRILL P PROD2 Drop the bar and open up the circ sub. Circulate a bottoms up at the shoe -440 gpm, 2,800 psi, PU - 135k, SO - 83k, ROT - 96k. 20:30 - 23:00 2.50 GRILL P PROD2 Monitor the well -stable. Pump solids free dry job and POH from 7,292' to the top of BHA#7 at 235'. 23:00 -00:00 1.00 DRILL P PROD2 PJSM to LD BHA and remove nuclear source. LD BHA#7 from 235'. 1/25/2006 00:00 - 01:00 1.00 DRILL P PROD2 Continue to LD BHA#7 from 235'. 6-3/4" DS146 RR graded: 1-1-CT-A-X-I-NO-TD 01:00 - 01:30 0.50 DRILL P PROD2 Clear and clean the floor. Service the wear ring. 01:30 - 07:00 5.50 CASE P RUNPRD PJSM for running liner. RU the rig floor. PU and RIH with the 4.5' 12.6# L-80 BTC slotted/IBT solid liner per running detail. Utilized BOL 2000 NM thread lubricant and torqued to mark with 4,000 ftibs. 07:00 - 13:00 6.00 CASE P RUNPRD RIH with 4.5` liner on 4' DP and HWDP to 10,621' -filling pipe every 3,000'. 13:00 - 14:00 1.00 CASE P RUNPRD Tag bottom at 10,621'. PU - 168k, SO - 62k. PU 2' off bottom to 10,619'. Drop and pump ball down and allow to seat. Pressure up to 3,500 psi to set and release from the HMC hanger. Bleed off pressure. Set ZXP packer with 50k SO. Pressure up the back side to 2,000 psi to test the liner top packer for 5 minutes -good. TOL - 6,907', Shoe -10,619'. 14:00 -15:00 1.00 CASE P RUNPRD Circulate a bottoms up - 242 gpm, 1,000 psi. Monitor the well - stable. Pump SF dry job. 15:00 - 18:30 3.50 CASE P RUNPRD POH standing back the 4' DP and HWDP. LD the liner running tool. 18:30 - 19:30 t.00 BOPSU P RUNPRD Pull wear ring and install test plug. RU to test BOPE. Printed: 2/21f2006 10:57:46 AM gp Page 11 of 23 Operations Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task 'Code NPT Phase ' 'Description of Operations 1/25/2006 19:30 - 23:00 3.50 BOPSU P RUNPRD Test the BOPE, Annular Preventer, valves and equipment to 250 psi low and 3,500 high. 1 failure noted -dart valve. Changed it out and tested successfully. Witness of the test was done by Chuck Schieve - AOGCC, Brian Tiedemann - NAD Rig Supervisor, and James Franks - BP Wellsite Leader. 23:00 - 00:00 1.00 BOPSU P RUNPRD RD all testing equipment. Blow down top drive and all surface equipment. Clear and clean the floor. 1/26/2006 00:00 - 02:30 2.50 EVAL P INT1 PJSM. RU SLB wireline. RIH with USIT to log the cement quality of the 7-5/8' intermediate casing from 6,907'. 02:30 - 03:30 1.00 EVAL N DFAL INT1 USIT not working properly. Trip out of the hole to troubleshoot problem. 03:30 -04:15 0.75 EVAL N DFAL INT1 Troubleshoot wireline problem -burnt wire in cable head. 04:15 -04:45 0.50 EVAL N DFAL INT1 RIH with USIT to 6,907' 04:45 - 07:00 2.25 EVAL P INTi Log up with the USIT from 6,907' to 3350. Good zonal isolation. 07:00 - 08:30 1.50 EVAL P INT1 RD SLB wireline tools and equipment. 08:30 - 09:30 1.00 STWHIP P WEXIT Bring Baker Whipstock tools to the rig floor. RU to run Whipstock. 09:30 - 12:00 2.50 STWHIP P WEXIT PU and MU Whipstock/Milling BHA for L2 to 451'. Orient MWD. Whipstock/Milling BHA - no go sub w/seals, unloader sub, pup, 1 x 3.5" HWDP, double pin sub, anchor, safety disconnect sub, unloader sub, debris sub, bit sub, whipstock, starting mill, lower string mill, flex joint, 1 x 3.5" HWDP, float sub, MWD, bumper sub, 9 x dc's. 12:00 - 12:30 0.50 STWHIP P WEXIT RIH with whipstock on 4" HWDP and 4" DP to 1,189'. Shallow test the MWD -good - 290 gpm, 1,065 psi. 12:30 - 16:00 3.50 STWHIP P WEXIT Continue RIH with whipstock to 6,872'. 16:00 - 16:30 0.50 STWHIP P WEXIT Orient whipstock 8 degrees LHS. Tag the liner top and set the whipstock with 10k SO. Test the backside to 1,500 psi -good. Shear off of the whipstock with 50k SO. TOW - 6,832', BOW - 6,844'. 16:30 - 18:00 1.50 STWHIP P WEXIT Displace the well over to 9.2 ppg MOBM with CaC03. 18:00 -00:00 6.00 STWHIP P WEXIT Mill window from 6,832' to 6,844' and drill new formation to 6,861' -300 gpm, 2,030 psi, 120 rpm, 5k TQ off, 6 k TO on. 1/27/2006 00:00 - 01:00 1.00 STWHIP P WEXIT Circulate a hi-visc sweep surface to surface to clean up the hole. 01:00 - 05:00 4.00 STWHIP P WEXIT POH standing back 4"DP and HWDP. LD Milling BHA. Clear and clean the floor. 05:00 -05:30 0.50 STWHIP P WEXIT PU circ sub and flush the stack. 05:30 - 07:30 2.00 DRILL P PROD3 PJSM for PU BHA and loading nuclear source. MU L2 6-3/4" BHAff9 to 234' - 6.75" DS146H+GJUW-RR8, 4.75' AIM motor - 4R/5S - 6 stg - 1.5 bend, bypass sub w/float, nm stab, MWD/LWD, PWD, ADN, 2 x nm flex dc, circ sub, xo, 1 x 4' DP, jars. 07:30 - 10:30 3.00 DRILL P PROD3 RIH with 4' DP to 1,271'. Shallow test the MWD, 290 gpm, 1,590 psi -good. Continue RIH with BHAi49 on 4' DP and HWDP to 6,772' -filling pipe every 3,000'. 10:30 -12:00 1.50 DRILL P PROD3 Cut and slip dritiing line. Service the top drive, blocks and crown. 12:00 - 13:30 1.50 DRILL P PROD3 Circulate bottoms up and obtain baseline ECD values - 290 gpm, 2,280 psi, 60 rpm, CECD - 10.18. 13:30 - 14:00 0.50 DRILL P PROD3 Orient the toolface and RIH through the window to 6,861'. 14:00 - 15:30 1.50 DRILL P PROD3 Drill 6-314" ahead directionally from 6,861 ` to 7,041' - PU - 125k, SO - 90k, ROT - 100k, TQ - 5k, 2540 psi on, 2280 psi off, Printed: 2/21/2006 10:57:46 AM gp Page 12 of 23 Operatiolns Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase 'Description of Operations- 1/27/2006 14:00 - 15:30 1.50 DRILL P PRODS AST - 1.02, CECD - 10.18, AECD - 10.3. AIM not working, but try to troubleshoot while drilling to 7,041' -unsuccessful. MW in - 9.2, MW out - 9.2. 15:30 - 19:00 3.50 DRILL N DFAL PRODS Monitor the well -stable. Pump dry job and POH from 7,041' to the top of BHA#9 at 234'. 19:00 - 20:30 1.50 DRILL N DFAL PRODS PJSM to LD BHA#9 and remove the nuclear source. Handle BHA#9 at surface. LD MWD and AIM motor. Clear and clean the floor. 6-3/4" DS146 RR8 graded: 1-1-CT-A-X-I-NO-OTF 20:30 - 21:30 1.00 DRILL N DFAL PRODS PJSM for PU 8HA and loading nuclear source. MU L2 6-3/4" BHA#10 to 234' with new AIM motor and MWD. BHA#10: 6.75" DS146H+GJUW-RR9, 4.75" AIM motor - 4R75S - 6 stg - 1.5 bend, bypass sub w/float, nm stab, MWD/LWD, PWD, ADN, 2 x nm flex dc, circ sub, xo, 1 x 4" DP, jars. 21:30 - 00:00 2.50 DRILL N DFAL PRODS RIH with 4" DP to 1,177'. Shallow test the MWD, 290 gpm, 1,590 psi -good. Continue RIH with BHA#10 on 4" DP and HWDP to 4,020' -filling pipe every 3,000'. 1/28/2006 00:00 - 01:30 1.50 DRILL N DFAL PRODS Continue RIH with BHA#10 on 4" DP and HWDP from 4,020'. Orient the tool face and slide through the window. RIH to 7,041' -filling pipe every 3,000'. 01:30 - 12:00 10.50 DRILL P PRODS Drill 6-3/4' ahead directionally from 7,041' to 8,068' - PU - 138k, SO - 73k, ROT - 98k, 290 gpm, TO on - 5.5k, TO off 5.5k, 2,750 psi on, 2,600 psi off, CECD - 10.45, AECD - 10.95, AST - 2.15, ART - 2.13 -taking 30' surveys and backreaming each stand. 12:00 - 00:00 12.00 DRILL P PRODS Drill 6-3/4° ahead directionally from 8,068' to 9,466' - PU - 145k, SO - 63k, ROT - 95k, 290 gpm, TO on - 7k, TQ off - 6.Sk, 2,950 psi on, 2,750 psi off, CECD - 10.68, AECD - 11.2, AST - 2.91, ART - 2.75 -taking 30' surveys and backreaming each stand. 1/29/2006 00:00 - 09:00 9.00 DRILL P PRODS Drill 6-3/4" ahead directionally from 9,466' to 10,605' (rD) - PU - 147k, SO - 60k, ROT - 97k, 290 gpm, TO on - 8k, TO off - 7k, 3,160 psi on, 2,980 psi off, AST - 1.97, ART - 2.53, CECD - 10.8, AECD - 11.3, taking 30' surveys and backreaming each stand. 09:00 -22:00 13.00 DRILL P PRODS Circulate up surveys and prepare to MAD pass to the window. MAD Pass / Backream from 10,605' to 6,945' -600 fph max, 270 gpm, 60 rpm, 2,980 psi, 7k TO. Orient the BHA to 15 LHS and pull through the window into the 7-5/8" intermediate casing to 6,761'. 22:00 - 22:30 0.50 DRILL P PRODS Service the top drive, blocks and the crown. 22:30 -00:00 1.50 DRILL P PRODS RIH from 6,761' to 7,970'. 1/30/2006 00:00 - 01:00 1.00 DRILL P PRODS Continue RIH from 7,970' to 10,605'. 01:00 -02:30 1.50 DRILL P PRODS Circulate a bottoms up to ensure hole clean. Displace the well over to 9.2 ppg SF MOBM -290 gpm, 2900 psi. 02:30 -04:30 2.00 DRILL P PRODS POH from 10,605' to 7,134'. 04:30 -06:00 1.50 DRILL P PRODS Orient the motor to -20 LHS. Drop the bar and open the circ sub. Wash across the face of the whipstock without rotary through the circ sub. Pull up above the whipstock to 6,761' and circulate a bottoms up - 290 gpm, 1,150 psi. Monitor the well - stable. Pump SF dry job. 06:00 -09:00 3.00 DRILL P PRODS POH standing back the 4' DP and HWDP to the top of the BHA at 234'. 09:00 - 10:30 1.50 DRILL P PRODS PJSM to LD BHA#10 and remove the nuclear source. Handle PrirHed: 2/21/2006 10:57:46 AM gp Page 13 of 23 Operations-Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To_ Hours Task ' Code NPT 'Phase Description of Operations 1/30/2006 09:00 - 10:30 1.50 DRILL P PROD3 BHA#10 at surface. 6-3/4" DS146 RR9 graded: 1-2-CT-G-X-I-NO-TD 10:30 - 12:00 1.50 DRILL P PROD3 Clean and clear the floor. Bring Whipstock retrieval tools to the floor. Hold PJSM with crew coming on tour on MU BHA #11 12:00 - 15:00 3.00 WHIP P RUNPRD PU Whipstock retrieval BHA #11. Orient hook with MWD, PU 4.75' dc's and RIH to 377'. Test MWD -good. Continue to RIH to retrieve whipstock from 377' to 6,812' with 4" HWDP and DP from the derrick. BHA#11: Hook, 1 x 3.5" HWDP, float sub, MWD, bumper sub, jars, 9 x 4.75" dc's, xo 15:00 - 15:30 0.50 WHIP P RUNPRD Orient the hook to 15 LHS - PU - 130k, SO - 90k. RIH to 6,836', hook whipstock and SO 10k. PU to 150k and allow the jars to bleed off. PU to 170k and the whipstock pulled free. POH to 6,821'. 15:30 - 16:30 1.00 WHIP P RUNPRD Circulate bottoms up - 200 gpm, 830 psi. 16:30 - 20:30 4.00 WHIP P RUNPRD POH standing back the 4" DP and HWDP as well as the 4.75" DC's. 20:30 - 21:00 0.50 WHIP P RUNPRD LD the Whipstock and associated tools down to the safety disconnect. Left in the hole -safety disconnect w/ 3.5" fishing neck, anchor, double pin sub, 1 x 3.5" hwdp, pup, unloader sub, and nogo sub w/seals. 21:00 - 22:30 1.50 WHIP N DFAL RUNPRD MU Overshot BHA#12 and RIH - oveshot with 3.5° grapple, bumper sub, jars, float sub. RIH with 9 x 4.75" DC's from the derrick. 22:30 - 00:00 1.50 WHIP N DFAL RUNPRD RIH with Overshot BHA#12 to 3,134' on 4" DP and HWDP from the derrick. 1/31/2006 00:00 - 01:30 1.50 WHIP N DFAL RUNPRD Continue RIH with Overshot BHA from 3,134' to 6,821' on 4" DP and HWDP from the derrick. 01:30 - 02:30 1.00 WHIP P RUNPRD Cut and slip drilling line. Service the top drive, blocks and crown. 02:30 -03:00 0.50 WHIP N DFAL .RUNPRD Engage and wash over the fish at 6,860'- PU - 125k, SO - 80k. SO 5k, then PU to 175k and let the jars fire -not free. SO and set the jars. PU to 1 SOk and fire the jars -not free. Set the jars, then PU to 190k and fire the jars -not free. Set the jars, Then PU to 205k and fire the jars -free. 03:00 -04:00 1.00 WHIP N DFAL RUNPRD Circulate a bottoms up - 200 gpm, 2,000 psi. 04:00 -08:30 4.50 WHIP N DFAL RUNPRD POH, standing back the 4" DP, HWDP and 4.75` DC's, with the remaining sections of the Whipstock Setting BHA. 08:30 - 10:00 1.50 WHIP N DFAL RUNPRD Lay down fishing assembly and fish. Recovered: safety disconnect, Anchor, ported bit sub, 1 jt. fiwdp, spacer sub, unloader, no go, liner top seal assembly. Clear floor of all excess vendors equipment. 10:00 - 18:30 8.50 CASE P RUNPRD P/U casing equipment and all needed jewelry to run slotted liner in Lat # 2 wellbore. P/U solid bent joint with shoe, cross over, 92 joints of 41/2, L8012.5 # BTC slotted liner, X0, swell packer assembly, XO and Hook wall hanger assembly. RIH w/ 4' DP to 6,800'. 18:30 - 19:00 0.50 CASE P RUNPRD M/ U Top Drive and Established Parameters, Up Wt 110K, Dn Wt 77K, Rty Wi 95K, Rotary 10 rpm at 3,000 fUlbs torque, Pump 3 bpm at 220 psi. RIH to 6,854' (10' past btm of window) P1U to 6,838', rotated 6 turns to right, let out string torque, got 1/2 turn back. Slacked off and exited window from 6,832' to 6,844'. 19:00 - 21:30 2.50 CASE P RUNPRD RIH w! L2 4-1/2" Slotted Liner on 4" DP (utilizing 4' HWDP and Printed: 2/21/2006 70:57:46 AM BP Page 14 of 23 - Operations Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1!612006 End: 2/16/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABORS 9ES Rig Number: Date Froth - To Hours Task I Code NPT Phase Description of Operations 1/31/2006 19:00 - 21:30 2.50 CASE P RUNPRD 4-3/4" DC for weight) to 10,597' 4-1/2" Shoe Depth. Up Wt 154K, Dn Wt 75K 21:30 - 22:00 0.50 CASE P RUNPRD P/U to 6,822' HooK Depth, Apply 1-1/2 turns to right, held torque in place. S/O and latched Hook at 6,827' w/ 35K Dn Wt. P/U to free point, S/O and rehookd to verify. P/U to 6,882 and applied 1-1/2 turns to right, S/O to 6,834' to verify Hook unlatched. P/U to 6,822', and 3/4 turn to right, S/O and rehook w/ 35K Dn Wt. P/U and rehooked to verify hooked depth of 6,827'. 4-1/2" Shoe Depth 10,590' 22:00 - 22:30 0.50 CASE P RUNPRD B/O Top Drive and drop 29/32" ball and pump on seat at 3 bpm, 630 psi. Pressure up to 3,100 psi to release HR setting tool. PIU string with 125K Up Wt to verify tool released. Pressure up to 4,200 to shear the ball seat. POH w/ running tool to 6,775'. 22:30 - 00:00 1.50 CASE P RUNPRD Circulated B/U with 9.2 ppg mud at 209 gpm, 752 psi. Monitored Well-Static, Pumped Dry Job, Blew Dn Top Drive. Up Wt 128K, Dn Wt 73K. 2/1/2006 00:00 - 03:00 3.00 CASE P RUNPRD POH w/ HR Setting Tool, Standing Back in derrick HWDP and DC to be reused for the LEM #1 Run 03:00 - 03:30 0.50 CASE P RUNPRD Make service breaks on HR Setting Tool and UD same 03:30 -04:00 0.50 CASE P RUNPRD Clear and clean rig floor, P/U LEM Running Equipment 04:00 - 04:30 0.50 CASE P RUNPRD R/U Power tongs and C/O Elevators to 4-1/2" 04:30 - 05:30 1.00 CASE P RUNPRD Held PJSM, P/U Non Locating Seal Assy, 1 ea. 4.5" 12.6# L-80 XO joint, 1 Jt 4.5" 12.6# L-80 IBT, 1 ea 4.5" 12.6# L-80 IBT pup jt, LEM Hanger, 1 ea 4.5" 12.6# L-80 IBT-M pup jt, Casing Swivel, 5-1/2" HYD 563 x 4-1/2" IBT XO Bushing, Baker 190-47 Seal Bore Extension., Baker ZXP Liner top Packer. 05:30 - 06:30 1.00 CASE P RUNPRD R/U 2-7/8" false bowl on top of SBR. C/O Elevators. PU 5 jts 2-38" inner string. 06:30 - 11:00 4.50 CASE P RUNPRD RIH with LEM #1 on 4" drill pipe from 187' to 6,837' ~ 60 fpm. 11:00 - 12:00 1.00 CASE P RUNPRD Set down ~ 6,837'. Pick up and rotate string 3/4 turn and work non-locating seal assembly through hook hanger assembly. PU - 137k, SO - 85k. 12:00 - 13:00 1.00 CASE P RUNPRD Make up topdrive and wash down to 6,945'. Set LEM in hook hanger and engage same with 30k down weight. Pick up 15k over string weight verifying LEM engagement. Drop 1.75' ball and circulate ball down ~ 4 bpm, 750 psi. Decrease rate to 2 bpm prior to ball seat. Pressure up to 2800 psi, wait 1 minute and set ZXP packer with 4,000 psi. Release liner running tool from packer. Test ZXP liner top packer to 1,500 psi - 5 minutes - OK. Pick up string above LEM, pump dry job. Blow down kill line and top drive. Top of finer ~ 6,769.52 13:00 - 16:00 3.00 CASE P RUNPRD POH from 6,769' to 197'. 16:00 - 17:30 1.50 CASE P RUNPRD Lay down liner running tools and 2-7/8" inner string. Clear floor. 17:30 - 18:30 1.00 WHIP P WEXIT Pick up Whipstock tools to rig floor, steam same. 18:30 - 19:30 1.00 WHIP P WEXIT Make up Whipstock assembly #2. Orient MWD and Whipstock. 19:30 - 20:30 1.00 WHIP P WEXIT RIH with drill collars and HWDP to 1,340'. Test MWD - OK. 20:30 - 23:30 3.00 WHIP P WEXIT Continue RIH with Whipstock #2 on 4" drift pipe from 1,340' to 6,662' Printed: 2/21/2006 10:57:46 AM gp Page 15 of 23 Operations Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Gade NPT Phase Descriptior- of Operations 2/1/2006 23:30 -00:00 0.50 WHIP P WEXIT Orient Whipstock to 10 deg left of high side. 2/2/2006 00:00 - 00:30 0.50 WHIP P WEXIT RIH from 6,669' to top of liner ~ 6,769'. PU - 137k, SO - 85k. Set 15k down and set anchor. Pick up to 18k over string weight to verify anchor set. Set down 35k to shear lug. Pressure test backside to 1,500 psi - 5 min - OK. Top of window 6,732', bottom of window 6,744'. 00:30 - 01:30 1.00 WHIP P WEXIT Displace well from 9.2 ppg SFMOBM to 9.2 ppg MOBM ~ 300 gpm, 2,120 psi. 01:30 - 04:30 3.00 STWHIP P WEXIT Mill window from 6,732' to 6,744'. 350 gpm 2,690 psi, 50 rpm, 5-7k TO. 04:30 - 07:00 2.50 STWHIP P WEXIT Drill L3 new hole from 6,744' to 6,761'. 350 gpm, 2,690 psi, 50 rpm, 4-Sk TO, 3-Sk WOB. 07:00 - 09:00 2.00 STW HIP P WEXIT Ream and wipe window clean. 1st attempt pulled 15k over at 6,739'. Pull up free to 6,725'. Go back down to 6,740' taking 35k. Pick up and ream window ~ 280 gpm, 1,920 psi, 75 rpm, 5.2k TO. Work through window without rotating with same results as 1st attempt. Time ream window from 6,739' to 6,759' @ 290 gpm 1,920 psi, 75 rpm, 5.2k TO. Wipe window - OK. 09:00 - 10:30 1.50 STWHIP P WEXIT Pump 50 bbl 11.2 ppg safe carb weighted high-vis sweep surface to surface. 280 gpm, 1,950 psi. Monitor well - OK. MW - 9.2 PP9~ 10:30 - 13:00 2.50 STWHIP P WEXIT POH with window milling assembly from 6,713' to 175'. 13:00 - 14:30 1.50 STW HIP P WEXIT lay down window milling assembly, lay down tools from rig floor. 14:30 - 15:00 0.50 STWHIP P WEXIT Clean MOBM off of rig floor. 15:00 - 16:00 1.00 STWHIP P WEXIT Make up BOP stack cleaning tools. Flush ROPE. Blow down surface equipment. 16:00 - 16:30 0.50 STWHIP P WEXIT Service rig and topdrive. Adjust disc brake, inspect brake linkage. 16:30 - 18:00 1.50 DRILL P WEXIT Hold PJSM on nuclear source. Pick up directional drilling BHA #14: Bit - 1.5 deg PDM AIM -bypass - NMSTB - MWD/LWD - ADN. Load nuclear source. Continue picking up BHA: NMFLEX DC's - circ sub - XO - 1 jt DP -Jar = 234'. *PW D not run due to damaged tool face. No backup available. 18:00 - 21:00 3.00 DRILL P WEXIT RIH from 234' to 1,164'. Test MWD - OK. RIH from 1,164' to 6,651. 21:00 - 22:00 1.00 DRILL P WEXIT Cut and slip drilling line 65'. Inspect brakes. 22:00 - 23:00 1.00 DRILL P WEXIT Establish slow pump rates. Orient 15 degrees left of high side. RIH 1 stand through window without problem to 6,761'. 23:00 -00:00 1.00 DRILL P PROD4 Directional drill from 6,761' to 6,805'. GPM - 290, PSI ON - 2,425, PSI OFF - 2,320, RPM - 0, PU - 134k, SO - 85k. AST - .39 hrs. 2/3/2006 00:00 -00:00 24.00 DRILL P PROD4 Directional drill OBa L3 with BHA #14 from 6,805' to 8,743'. GPM - 290, PSI ON - 2,750, PSI OFF - 2,620, RPM - 60, TQ ON - 7k, TQ OFF - 6.8k, PU - 130k, SO - 74k, ROT - 99k, WOB - 5-15k. AST - 10.35 hrs, ART - 2.65 hrs. Backream each stand, survey every 30'. 2/4/2006 00:00 - 16:30 16.50 DRILL P PROD4 Directional drill OBa L3 with BHA #14 from 8,743' to TD ~ 10,585' MD, 4,410' TVD. GPM -290, PSI ON - 3,000, PSI OFF - 2,810, RPM - 60, TO ON - 7.8k, TO OFF - 6.4k, PU - 129k, SO - 72k, ROT - 96k, WOB - 10-15k. AST - 4.19 hrs, ART - Printed: 2/21/2008 10:57:46 AM ~ ..~ gp Page 76 of 23 Operations Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABOBS 9ES Rig Number: Date I From - To I Hours Task `Code I NPT Phase Description of Operations 2/4/2006 00:00 - 16:30 16.50 DRILL P PROD4 4.22 hrs. Backream each stand, survey every 30'. 16:30 - 17:00 0.50 GRILL P PROD4 Circulate 1 open hole volume ~ 300 gpm, 3,000 psi. Monitor well - OK. 9.2 ppg mud weight. 17:00 - 00:00 7.00 DRILL P PROD4 MadPass log from 10,595' to 8,611'. 600 fph, 300 gpm, 2,850 psi, 60 rpm, 6-7k TO. 2!5/2006 00:00 - 05:30 .5.50 DRILL P PROD4 Continue MadPass fog from 8,611' to 6,837'. 600 fph, 300 gpm, 2,850 psi, 60 rpm, 6-7k TO. Puil up from 6,839' to 6,725' (above window) without rotating. PU - 135k, SO - 90k ~ window. Monitor well - OK. 05:30 - 06:00 0.50 DRILL P PROD4 Service Topdrive. 06:00 - 08:00 2.00 DRILL P PROD4 RIH from 6,725' to 10,585'. Washed last stand down. 08:00 - 09:00 1.00 DRILL P PROD4 Circulate bottoms up ~ 300 gpm, 2,960 psi, 60 rpm, 7k tq, 100k RW. 09:00 - 10:00 1.00 DRILL P PROD4 Displace well from 9.2 ppg LSMOBM to 9.2 ppg SFMOBM @ 300 gpm, 2,960 psi, 60 rpm, 7k tq, 100k RW. 10:00 - 13:00 3.00 DRILL P PROD4 Monitor well - OK. POH from 10,585' to 6,646'. PU - 150k, SO - 80k. Obtain PU / SO weights every 1,000'. 13:00 - 14:00 1.00 DRILL P PROD4 Monitor well - OK. Drop 1-7/8" ball, shear out circ sub ~ 2,360 psi. Circulate bottoms up ~ 330 gpm, 2,430 psi, 60 rpm, 6k tq. Pump dry job. 14:00 - 16:00 2.00 DRILL P PROD4 POH from 6,646' to 313'. 16:00 - 17:30 1.50 DRILL P PROD4 PJSM on nuclear source. Lay down BHA #14. Change out circ sub, stand back DC's. Lay down MWD, motor and bit. Bit #RR10 grade: O-O-WT-A, X-I-NO-TD 17:30 - 18:00 0.50 DRILL P RUNPRD Clear and clean rig floor. Pick up Baker tools to rig floor. 18:00 - 18:30 0.50 WHIP P RUNPRD Make up Baker Whipstock retreival tools per Baker rep. 18:30 - 19:30 1.00 WHIP P RUNPRD Pick up 9 4-3/4" DC's from pipe shed from 99' to 378'. 19:30 - 20:00 0.50 WHIP P RUNPRD RIH with whipstock fishing assembly on 4" HWDP from 378' to 1,037'. Shallow hole test MWD - OK. 290 gpm, 950 psi. 20:00 - 22:00 2.00 WHIP P RUNPRD RIH on 4" drill pipe from 1,037' to 6,620'. Fill pipe and break circulation ~ 4,068'. 22:00 - 23:00 1.00 WHIP N DPRB RUNPRD Attempt fo break circulation without success by pressuring up and bleeding off, back and forth and by shaking drill string. Drill siring plugged. Checked surface equipment - OK. 23:00 -00:00 1.00 WHIP N DPRB RUNPRD POH with wet string from 6,620' to 6,047'. 'Slow due to air breaking out of drill string. 2/6/2006 00:00 - 03:00 3.00 WHIP N DPRB RUNPRD Continue POH wet from 6,047' to 99' with plugged whipstock fishing assembly. Slow due to air breaking out of drill string up unti13,050' 03:00 -04:00 i.00 WHIP N DPRB RUNPRD Lay down fishing assembly looking for obstruction. The circulating port in the retriever hook assembly was plugged. Obstruction was shiny metal shavings that filled approximately 1/4 of a 5 gal bucket from the retriever hook assembly up into the joint of 3-1/2' HWDP about 6 feet. The float valve was missing one of the exterior seals. (not recovered) Clean out retriever hook assembly and joint of HWDP. Rabbit joint - OK. 04:00 -04:30 0.50 WHIP N DPRB RUNPRD Clean MOBM from rig floor. 04:30 - 05:00 0.50 WHIP N DPRB RUNPRD Make up Baker fishing assembly, change out MWD and orient same. RIH with 3 stands DC's to 376'. 05:00 -06:00 1.00 WHIP N DPRB RUNPRD RIH with fishing assembly on drill pipe from 376' to 1,035'. 06:00 -06:30 0.50 WHIP N DPRB RUNPRD Shallow hole test MWD. 300 gpm, 960 psi - OK. 06:30 -09:30 3.00 WHIP N DPRB RUNPRD Continue RIH from 1,035' to 6,237'. Fill pipe and break circulation starting ~ 4,067' and continue every 5 stands. Printed: 2121/2006 10:57:46 AM gp Page 17 of 23 0-perations Summary Report. Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABORS 9ES Rig Number: Date From = To Hours Task Code NPT Phase Description of Operations 2/6/2006 09:30 - 10:30 1.00 WHIP N DPRB RUNPRD Cut and slip drilling line 79'. 10:30 - 11:00 0.50 WHIP N DPRB RUNPRD Continue RIH from 6,237' to 6,600' breaking circulation every stand. Orient 10 deg left of high side. PU - 130k, SO - 80k (pumps on) 11:00 - 12:00 1.00 WHIP P I RUNPRD Shut down pumps. PU - 135k, SO - 90k. Latch up on whipstock on depth ~ 6,734'. Pick up 20k over. Slack back down 5k to verify in slot. Pull 85k over string weight to release trip anchor. Pick up to 6,716' to clear dummy seals from L2 liner top. 12:00 - 13:00 1.00 WHIP P RUNPRD Circulate bottoms up ~ 255 gpm, 1,425 psi. Lost 13 bbls initially, lost 17 bbls total. Monitor well -static. 9.2 ppg MW. 13:00 - 16:00 3.00 WHIP P RUNPRD POH with L3 whipstock form 6,716' to 377'. PU - 140k. 16:00 - 17:30 1.50 WHIP P RUNPRD Stand back DC's and laydown fishing assembly and fish. Recovered ali of fish. 17:30 - 18:00 0.50 WHIP P RUNPRD Clean and clear rig floor. Lay down vendor tools. 18:00 - 19:00 1.00 CASE P RUNPRD Rig up to run L3 slotted liner. 19:00 - 00:00 5.00 CASE P RUNPRD Pick up, make up and RIH with 4.5" 12.6# L-80 BTC slotted liner assembly as per running detail. Made up BTC joints to 3,800 ft/Ibs and IBT joints to 3,000 fUlbs using BOL 2000 NM. Liner weight - PU - 73k, SO - 63k. Ran total of: 1 bent solid xo joint with float shoe, 78 joints 4.5" 12.6# L-80 BTC slotted liner, Swell packer, 9 joints 4.5" 12.6# L-80 IBT solid liner, Swell packer, Hook hanger assembly 4 4.5" 12.6# L-80 IBT space out pups. 3,855' 2/7/2006 00:00 - 05:30 5.50 CASE P RUNPRD Continue RIH with L3 slotted liner assembly on 4' drill pipe, 3 stands 4-3/4" drill collars, 8 stands 4" HWDP from 3,857' to 10,445' C~? 60 fpm. Worked through window ~ 6,732' and had success on 4th try. PU - 110k, SO - 75k ~ window. 05:30 -06:00 0.50 CASE P RUNPRD Hang L3 liner ~ 6,744'. PU -150k, SO - 75k. Ran in hole 8' past hanger hook to total depth of 10,584'. Pick up above hanger hook, tum pipe 1/4 tum and land hanger ~ 6,744'. Pick up, slack off to verify hanger set. Pick up above hook, tum pipe 180 deg. Slack off and RIH 8' past hanger hook. Pick up and tum pipe 180 deg, slack back down and re-hang liner with 35k. Pick up, slack off to verify hook. Drop 29132" ball and pump down to seat same. Pressure up to 2,500 psi to release HR setting tool, hold 1 minute, pressure up to 4,400 psi to shear ball seat. Pick up 50' to 6,690'. PU - 135k. Shoe Printed: 2/21!2006 70:57:46 AM gP 'Page 18 of 23: -Operations Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/7!2006 05:30 - 06:00 0.50 CASE P RUNPRD depth - 10,576' Tops: Float shoe, PBTMD - 10,575' 1 bent solid xo joint - 10,534' 78 joints 4.5" 12.6# L-80 BTC slotted liner - 7,246' Swell packer - 7,211' to 7,222' 9 joints 4.5" 12.6# L-80 IBT solid liner - 6,810' Swell packer - 6,785' to 6,796' Hook hanger assembly - 6,727' 06:00 - 07:00 1.00 CASE P RUNPRD Circulate bottoms up ~ 295 gpm, 1,460 psi. 9.2 ppg MW. 07:00 - 12:00 5.00 CASE P RUNPRD Monitor well - OK. POH from 6,690' to surface. PU - 135k, SO - 90k. Lay down liner running tool. 12:00 - 12:30 0.50 CASE P RUNPRD Clean and clear rig floor. 12:30 - 13:00 0.50 CASE P RUNPRD Rig up to run LEM #2. 13:00 - 13:30 0.50 CASE P RUNPRD Service topdrive and crown. 13:30 - 15:30 2.00 CASE P RUNPRD Held PJSM, P/U Non Locating Seal Assy, 1 ea. 4.5" 12.6# L-80 XO joint, 1 ea 4.5" 12.6# L-80 IBT pup jt, LEM Hanger, 1 ea 4.5" 12.6# L-80 IBT-M pup jt, Casing Swivel, 5-1/2" HYD 563 x 4-1/2" IBT XO Bushing, Baker 190-47 Seal Bore Extension, Baker ZXP Liner top Packer. 15:30 - 16:00 0.50 CASE P RUNPRD Rig down Nabors Casing Service 16:00 - 20:30 4.50 CASE P RUNPRD RIH with LEM #2 on 4" drill pipe, 3 stands 4-3/4" drill collars, 8 stands 4" HWDP from 141' to 6,663'. PU - 138k, SO - 88k. 20:30 - 22:00 1.50 CASE P RUNPRD Wash down from 6,663' with seal assembly through top of LEM #1 on depth to 11' inside of Seal Bore Extension with hanger ~ 6,727'. Up weight in tie back - 155k. Pick up to 170k to verify hook, slack of to 105k. 22:00 - 22:30 0.50 CASE P RUNPRD Drop 1-3/4" ball and pump down to seat same. Stage up pump and pressure up to 4,000 psi to set packer and release packer running tool. Bleed off pressure. Test packer to 1,500 psi - 5 min - OK. Top of LEM f#2 ~ 6,671'. 22:30 - 23:30 1.00 CASE P RUNPRD Pick up drill string to clear inner string out of liner top to 6,659'. Monitor well - OK. Blow down surface lines, pump dry job for POH. 9.2 ppg MW. PU - 130k. 23:30 -00:00 0.50 CASE P RUNPRD POH from 6,659' to 5,800' with LEM running tool. 2/8/2006 00:00 - 03:00 3.00 CASE P RUNPRD Continue POH from 5800' to 125' 03:00 - 03:30 0.50 CASE RUNPRD Lay down LEM running tool, lay down 2-3/8' inner string. 03:30 -04:00 0.50 CASE P RUNPRD Clean and clear rig floor of vendor and liner running equipment. 04:00 - 05:00 1.00 BOPSU P WEXIT Pull wear bushing, set BOP test plug. Rig up to test BOPE. 05:00 -09:00 4.00 BOPSU P WEXIT Test ROPE and surface equipment per state requirements. Witnessing of test waived by AOGCC rep. John Crisp. Test witnessed by BP WSL's R. French, L. Vaughan and NAD TP's B. Tiedemann, B. Bixby. 09:00 - 10:00 1.00 BOPSU P WEXIT Rig down BOP test equipment, blow down surface lines. Install wear bushing. 10:00 - 10:30 0.50 WHIP P WEXIT Pick up Whipstock tools to rig floor. 10:30 - 12:30 2.00 WHIP P WEXIT Make up Whipstock -Mill assembly per Baker rep to 501' 12:30 - 15:30 3.00 WHIP P WEXIT RIH with BHA on 4' drill pipe from 501' to 6,553' ~ 60 fpm. Shallow hole tested MWD ~ 1,154' - OK. Printed: 2/21/2006 10:57:46 AM gp Page 19 of 23 .Operations Suimrnary Report: Legal Well Name: V-203 Common We11 Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task' Code NPT Phase bescr•iption of Operations 2/8/2006 15:30 - 16:00 0.50 WHIP P WEXIT Orient 10 deg left of high side. 250 gpm, 1830 psi. PU - 138k, SO - 90k. 16:00 - 18:00 2.00 WHIP P WEXIT RIH and tag LEM #2 liner top on depth C~? 6,671'. Set down 20k to set anchor, pick up 10k over to verify anchor. Set down 35k to shear whipstock mills. Pick up to displace well. PU - 140k. 18:00 - 19:00 1.00 WHIP P WEXIT Displace well from 9.2 ppg SFMOBM to 9.2 ppg ppg LSMOBM ~ 260 gpm, 1,520 psi. 19:00 -00:00 5.00 STWHIP P WEXIT Sidetrack L4 window by milling from 6,548' to 6,560'. 300 gpm, 2,030 psi, 90 rpm, 4.9k TO. WOB - 3-5k. `Top of L4 window ~ 6,548' Bottom of window ~ 6,560'. 2/9/2006 00:00 - 01:30 1.50 STWHIP P WEXIT Drill new hole from 6,560' to 6,577' with whipstock milling assembly. 290 gpm, 1,970 psi, 90 rpm, 4.5k TO, 5k WOB. 01:30 - 02:00 0.50 STWHIP P WEXIT Pick up and work window several times by rotating up and down through window. 1st 2 attempts pulled 35k coming back up. Work until no drag present in window. PU - 125k, SO - 90k without pump. 02:00 - 03:00 1:00 STWHIP P WEXIT Circulate high viscosity /weighted sweep surface to surface ~ 290 gpm, 1,960 psi. Continue work pipe through window while circulating sweep with no problems. No extra cuttings returned with sweep. 03:00 - 05:30 2.50 STWHIP P WEXIT POH from 6,577' to 307' 05:30 - 06:30 1.00 STWHIP P WEXIT Laydown 4-3/4" drill collars and whipstock mills. Both mills "in gauge". 06:30 - 07:30 1.00 STWHIP P WEXIT Clean and clear rig floor of vendor tools. 07:30 - 08:30 1.00 BOPSU P WEXIT Make up BOP stack cleanout sub and flush BOP's. Slowdown choke and kill lines. 08:30 -11:00 2.50 DRILL P WEXIT Pick up, make up directional drilling BHA #18. Adjust motor housing from 1.50 deg to 1.83 deg. Hold PJSM on loading nuclear source. RIH to 237' 11:00 - 12:00 1.00 DRILL P WEXIT HSE review with Anchorage team. 12:00 - 14:30 2.50 DRILL P WEXIT RIH with BHA #18 on 4' drill pipe from 237' to 6,480'. Shallow hole tested MWD ~ 1,145' - OK. 14:30 - 15:30 1.00 DRILL P WEXIT Cut and slip drilling tine 76'. Clean out from under brake drum area. 15:30 - 16:00 0.50 DRILL P WEXIT Obtain benchmark ECD's and slow pump rates. OECD - 10.35 PP9• 16:00 - 20:30 4.50 DRILL P PROD5 Directionally drill OA L4 from 6,577' to 6,982'. 100% sliding, no backreaming. GPM - 290, PSI ON - 2,635, PSI OFF - 2,480, WOB - 5-15k. "Drilled out of OA shale into OBa sand (7' high to projected top) fei 6,837' MD, 4,355 TVD. Drilled back up into OA shale ~ 6,979' MD, 4,354 TVD. 20:30 -00:00 3.50 DRILL P PRODS Directionally drill OA L4 from 6,982' to 7,240'. Survey every 30', backream each stand. GPM - 290, PSI ON - 2,780, PSI OFF - 2,680, PU - 128k, SO - 74k, ROT - 95k, WOS - 5-10k, RPM - 60, TO ON - 5.5k, TO OFF - 4.6k. AST - 2.56 hrs, ART - .49 hrs, CECD - 10.42 ppg, AECD - 10.82 ppg. 2/10/2006 00:00 -00:00 24.00 DRILL P PROD5 Directionally drill OA L4 from, 7,240' to 9,751'. Survey every 30', backream each stand. GPM - 290, PSI ON - 3,100, PSI OFF - 2,900, PU - 128k, SO - 97k, ROT - 98k, WOB - 5-15k, Printed: 2/21/2006 10:57:46 AM ~ ~~ -- Bp Page 20 of 23 `Operations Slummary Reporf Legal Well Name: V-203 Common Well Name: V-203 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date From. - To Hours Task I Code NPT Ph 2/10/2006 00:00 - 00:00 24.00 DRILL P PRO 2/11/2006 00:00 - 09:30 9.50 DRILL P PRO Spud Date: 1 /8/2006 Start: 1 /6/2006 End: 2/16/2006 Rig Release: 2/16/2006 Rig Number: ase ~ Description of Operations D5 RPM - 60, TO ON - 7.4k, TO OFF - 6.7k. CECD - 10.86 ppg, AECD - 11.31 ppg. AST - 4.01 hrs, ART - 7.57 hrs. D5 Directionally drill OA L4 from, 9,751' to TD ~ 10,593' MD, 4,358' TVD. Survey every 30', backream each stand. GPM - 290, PSI ON - 2,995, PSI OFF - 2,800, PU - 128k, SO - 72k, ROT - 94k, WOB - 10-15k, RPM - 60, TO ON - 7k, TO OFF - 6k. CECD - 10.96 ppg, AECD - 11.04 ppg. AST - 1.63 hrs, ART - 2.47 hrs. TD OA Lateral 4 - 10,593' ~ 09:30 hr, 2/11/2006 09:30 - 10:00 0.50 DRILL P PRODS Circulate open hole volume ~ 290 gpm, 2,800 psi, 60 rpm, 6k TO. 9.2 PP9 MW. 10:00 - 00:00 14.00 DRILL P PROD5 Monitor well - OK. MadPass log by backreaming ~ 600 fph from 10,593' to 7,044'. GPM - 300, PSI -2,450, RPM - 60, TO 4.7k. CECD - 10.89 ppg, AECD - 11.26 ppg. Experienced minor packing off in lower OA shales from 7,435' to 7,068'. i00-150 psi increase with 5% decrease in flow rate, (0 bbl pit loss) with no increase in drag or torque. Slowed MadPass rate and work up and down as necessary through trouble spots. 2/12/2006 00:00 - 01:00 1.00 DRILL P PRODS Continue MadPass log by backreaming ~ 600 fph from 7,044' to 6,671' without problem. Pull last stand through window without rotation. No drag at window. GPM - 300, PSI -2,450, RPM - 60, TO 4.7k. CECD - 10.85 ppg, AECD - 10.95 ppg. 01:00 - 02:00 1.00 DRILL P PROD5 Circulate bottoms up ~ 255 gpm, 1,780 psi, 40 rpm, 4.3k TO, PU - 100k, SO - 89k. Monitor well - OK 02:00 - 02:30 0.50 DRILL P PRODS Service topdrive, blocks and crown. 02:30 - 05:00 2.50 DRILL P PRODS Orient bit and go down through window C~ 6,548'. RIH from 6,548' to TD ~ 10,593'. 05:00 - 06:00 1.00 DRILL P PRODS Circulate bottoms up ~ 290 gpm, 2,880 psi, 60 rpm, 6k TQ. PU - 129k, SO - 71 k, ROT - 95k. CECD -10.84 ppg, AECD - 10.96 ppg. No change in AECD after bottoms up. 06:00 - 07:00 1.00 DRILL P PROD5 Displace well from 9.2 ppg LSMOBM to 9.2 ppg SFMOBM ~ 290 gpm, 2,880 psi, 60 rpm, 6k TO. PU - 129k, SO - 71 k, ROT - 95k. 07:00 - 09:30 2.50 DRILL P PRODS Monitor well - OK. POH from 10,593' to 6,540'. No drag through window 09:30 - 10:30 1.00 DRILL P PROD5 Monitor well - OK. Drop 1-7/8" ball, shear out circ sub. Circulate bottoms up while backreaming from 6,540' to 6,194' ~ 420 gpm, 2,180 psi, 40 rpm, 4.Sk tq. Pump dry job. 10:30 - 14:00 3.50 DRILL P PRODS POH from 6,194' to 207'. 14:00 - 15:30 1.50 DRILL P PRODS PJSM on nuclear source. Lay down BHA #18. Stand back DC's. Lay down MWD, motor and bit. Bit #RR11 grade: 1-3-CT-A, X-1/16-6T-TD 15:30 - 16:00 0.50 DRILL P PRODS Clear and clean rig floor. 16:00 - 17:00 1.00 WHIP P RUNPRD Make up Baker Whipstock retrieval tools per Baker rep. 17:00 - 17:30 0.50 WHIP P RUNPRD Pick up 9 4-3/4" DC's from pipe shed from 99' to 378'. 17:30 - 18:30 1.00 WHIP P RUNPRD RIH with whipstock fishing assembly on 4" HWDP from 378' to 1,038'. Shallow hole test MWD - OK. 295 gpm, 1,020 psi. 18:30 - 22:00 3.50 WHIP P RUNPRD Continue RIH from 1,038' to 6,140'. Fill pipe and break circulation starting ~ 4,164' and continue every 5 stands. 22:00 - 22:30 0.50 WHIP P RUNPRD Continue RIH from 6,043' to 6,500' washing down last 5 stands. Orient 10 deg left of high side. PU - 130k, SO - 65k (pumps on) Printed: 2/27/2006 10:57:46 AM BP _Page 21 of 23 Operations Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task :Code NPT Phase Description of Operations 2/12/2006 22:30 - 23:00 I 0.50 WHIP P RUNPRD Shut down pumps. PU - 135k, SO - 90k. Latch into whipstock on depth ~ 6,554'. Pick up 20k over. Slack back down 5k to verify in slot. Pull 45k over string weight to release trip anchor. Slack off and set 10k back on whipstock, pick up easy to 90k j over and attempt to shear unloader valve. Slack off and set 10k back on whipstock, pick up faster to 70k over to jar and shear unloader valve. Pick up to 6,526' to clear dummy seals from L3 liner top. 6 bbls initial loss after unstinging from liner top. 23:00 - 00:00 1.00 WHIP P RUNPRD Circulate bottoms up t~ 29fl gpm, 2,020 psi. Lost i4 bbfs while circulating, lost 20 bbls total. Monitor well -static. 9.2 ppg MW. Pumpdryjob. 2/13/2006 00:00 - 02:30 2.50 WHIP P RUNPRD POH with L4 whipstock from 6,526' to 377'. PU - 140k. 02:30 - 03:00 0.50 WHIP P RUNPRD Stand back 43/4" DC's. 03:00 - 05:00 2.00 WHIP P RUNPRD Lay down fishing assembly and fish. Recovered all of fish. 05:00 - 05:30 ~ 0.50 WHIP P RUNPRD Clean arxi clear rig floor. Lay down vendor tools. 05:30 - 06:30 1.00 CASE P RUNPRD Rig up to run L4 slotted liner. 06:30 - 12:00 ~ 5.50 CASE P RUNPRD PJSM on running liner. Pick up, make up Lateral 4 4.5" slotted I liner assembly per running detail to 4,038'. Made up connections to mark for average of 3,600 fVlbs make up torque using Best-O-Life 2000 NM. Recorded up and down weights every 10 jts. i Ran 4,038' total of: 1- 4.5" 12.6# L-80 BTC X-over bent joint with float shoe. ' 74 jts 4.5" 12.6# L-80 BTC slotted liner. 2 6.4" OD Swell packers. 17 jts 4.5" 12.6# L-80 IBT solid liner. Baker flanged hook hanger assembly. 94 ea 4-5/8" x 5-3/4" x 8" centralizers, 90 ea free floating on slotted joints 2-74, solid joints 1-17, 4 ea fixed on Swell packers 2 ea on each side of element String weight: PU - 75k, SO - 60k 12:00 - 16:30 4.50 CASE P RUNPRD RIH with 4.5" slotted liner assembly on 4" drill pipe, 4' HWDP, 4-3/4' drill collars from 4,038' to 10,565" ~ 60 fpm. Worked through window by rotating 10 rpms, 3k torque. Torque increased to 3.4k torque, stopped rotating and go through window on 1st attempt. PU - 105k, SO - 75k ~ window. 16:30 - i 8:00 1.50 CASE P RUNPRD Hang flanged hook liner hanger ~ 6,560'. PU - 150k, SO - 75k. Made several attempts before successfully hanging liner off by fuming and working torque down and going past window 10'. Hang liner with 35k set down weight. Pick up, slack off to verify. Pick up and tum 180 deg., slack off and run past window. Pick up and turn 180 deg, slack off and re-hang liner. Pick up and slack off to verify. Hang liner with 35k set down weight. Break off topdrive, drop 29!32" ball and pump down to ball seat. Pressure up to 2,300 psi and release HR running tool. Hold pressure 1 minute, pick up and verify tool release, PU - 135k. Pressure up to shear ball seat ~ 4,500 psi. Pick up to 6,525'. Shoe ~ 10,576'. Tops: PBTMD - 10,574'. Printed: 2121/2006 10:57:46 AM gp Page 22 of 23 Operations Summary Report Legal Well Name: V-203 Common Well Name: V-203 Spud Date: 1/8/2006 Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 2/16/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/13/2006 16:30 - 18:00 1.50 CASE P RUNPRD Solid XO jt - 10,534'. Slotted liner - 7,395. Bottom Swell Pkr - 7,338'. Top Swell Pkr - 6,598' Liner top - 6,543' 18:00 - 19:00 1.00 CASE P RUNPRD Monitor well - OK. Circulate bottoms up ~ 300 gpm, 1,500 psi. 9.2 PP9 MW. 19:00 - 23:00 4.00 CASE P RUNPRD POH from 6,525' to liner running tool. 23:00 - 23:30 0.50 CASE P RUNPRD Service break liner running tool, lay down same. 23:30 - 00:00 0.50 CASE P RUNPRD Clean and clear rig floor. 2/14/2006 00:00 - 00:30 0.50 CASE P RUNPRD Rig up to run LEM #3. 00:30 - 02:30 2.00 CASE P RUNPRD Held PJSM, P/U Non Locating Seal Assy, 1 ea. 4.5" 12.6# L-80 XO joint, 2 ea 4.5" 12.6# L-80 IBT liner jt, LEM Hanger, 1 ea 4.5" 12.6# L-80 IBT-M pup jt, Casing Swivel, 5-1/2" HYD 563 x 4-1 /2" IBT XO Bushing, Baker ZXP Liner top Packer. 214' total length. Pick up 2 3/8" inner string 180'. 02:30 - 06:00 3.50 CASE P RUNPRD RIH with LEM #3 assembly on 4° drill pipe, HWDP, and drill collars from 214' to 6,644'. PU - 136k, SO - 89k. 06:00 - 07:30 1.50 CASE P RUNPRD Break circulation and wash down ~ 2 bpm, 580 psi through LEM #2 Liner Top Tie-back Sleeve and Seal Bore Extension on depth. Hang off LEM #3 on L4 hook hanger with seal assembly positioned 11 ft into LEM #2 Seal Bore Extension. Drop ball and circulate to ball seat. Stage pressure up to 4,000 psi to set LEM #3 Liner Top Packer ~ 6,498'. Bleed off pressure. Pressure up to 1,500 psi on annulus to test packer for 5 min - OK. LEM # 3 Tie Back - 11'L x 5.75" ID ~ 6,498' 07:30 - 08:30 1.00 CASE P RUNPRD Pull up to 6,511'. Circulate bottoms up ~ 353 gpm, 2,120 psi. 08:30 - 11:00 2.50 CASE P RUNPRD Displace well from 9.2 ppg SFMOBM to 9.2 ppg brine ~ 327 gpm, 1,170 psi. 11:00 - 15:00 4.00 CASE P RUNPRD Blow down surface lines. Clean trip tank, mud troughs, possum belly, shakers and rig floor. 15:00 - 21:00 6.00 CASE P RUNPRD Lay down drill pipe, HWDP, and drill collars from 6,511' to 200'. 21:00 - 22:00 1.00 CASE P RUNPRD Cut & slip drilling line 90'. 22:00 - 22:30 0.50 CASE P RUNPRD Service topdrive, crown, and blocks. 22:30 -00:00 1.50 CASE P RUNPRD Lay down LEM running tools and 2 3/8" inner string. 2/15/2006 00:00 - 01:30 1.50 CASE P RUNPRD RIH with 4"15.7ppf drill pipe to 4,581'. 01:30 - 02:00 0.50 CASE P RUNPRD CBU at 140 SPM, 348 GPM, 490 psi. 02:00 - 02:10 0.17 CASE P RUNPRD Flow check, wellbore stable. 02:10 - 05:30 3.33 CASE P RUNPRD POH lay down 4"15.7ppf drill pipe from 4,581' to surface. 05:30 - 06:00 0.50 BUNCO RUNCMP Pull wear ring, make dummy run with FMC tubing hanger, OK. 06:00 - 08:00 2.00 BUNCO RUNCMP Rig up Nabors tubing tongs and 4-1/2" handling tools. Rig up Schlumberger I-Wire spool and sheave. 08:00 -08:15 0.25 BUNCO RUNCMP Hold PJSM with rig crew aril service hands on 4-1/2' completion running procedure. 08:15 - 19:30 11.25 BUNCO RUNCMP RIH with 4-1/2" 12.6ppf L-80 IBT production string and completion equipment. MJU and test I-Wire. Cont. RIH, check I-Wire intergrity every 1,000'. Ran total 150 jts of tubing. 87 cable clamps, 3 SS bands. 19:30 -22:00 2.50 BUNCO RUNCMP Space out WLEG inside Tie-back sleeve. Install 12 blast rings and 2 stop rings on tbg hgr. M/U space out pup jt. and tbg hgr. Hook up I-Wire and test to 5,000 psi for 10 min.,OK. Slack off Printed: 2/21/2006 10:57:46 AM BP Operations Summary Report Page 23 of 23 ,Legal Well Name: V-203 ~ICommon Well Name: V-203 Spud Date: 1/8/2006 (Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006 'Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006 Rig Name: NABOBS 9ES Rig Number: Date I From - To 1 Hours 1 Task I Code I NPT 2/15/2006 ~i 19:30 - 22:00 2.50 BUNCO 22:00 - 23:00 1.00 BUNCO 23:00 - 00:00 1.00 BUNCO 2/16/2006 i 00:00 - 01:30 1.50 BUNCO 01:30 - 02:30 1.00 BOPSU P 02:30 - 05:00 2.50 WHSUR P X 05:00-06:30 1.50 WHSUR P 1 06:30 - 07:00 0.50 WHSUR P 07:00 - 08:00 1.00 RIGU P 08:00 - 12:00 4.00 CLEAN P 12:00 - 15:00 3.00 DHEOP P 15:00 - 19:00 4.00 WHSUR P 19:00 - 20:00 1.00 WHSUR P 20:00 - 21:00 1.00 WHSUR P 21:00 - 00:00 3.00 RIGD P Phase ~ Description of'.Operations RUNCMP and land tbg. Up Wt 95K, Dn Wt 75K. RILDS, Set TWC in tbg hgr. RUNCMP Rig down Nabors tubing tongs and 4-1/2' handling tools. Rig down Schlumberger I-Wire spool and sheave. RUNCMP Clear rig floor. Clean out catch pans under rig floor and pipe racks. RUNCMP Clean out mud and cuttings from catch pans and pipe racks under rig floor. RUNCMP N/D BOPE, set stack on stump in cellar. RUNCMP Move adapter flange into well cellar. N/U adapter flange with I-Wire. PT to 5,000 psi, OK RUNCMP Move Tree into well cellar. N/U tree. PT to 5,000 psi, OK RUNCMP R/U DSM high pressure lubricator on top of tree. Pull TWC, R/D lubricator. RUNCMP R/U circulating lines on tree. PT to 3,500 psi.OK CLEAN Reverse circulate 100 bbls clean 9.2ppg brine followed by 100 bbls clean 9.2ppg brine treated with corrosion inhibitor. Pump at 56 spm, 127 gpm, 200 psi. OTHCMP Drop 1.875" OD ball & rod down the tubing string to set packer. Pressure up to 4,200 psi to set packer and test tubing. Hold for 30 min. OK. Bleed off tubing pressure to 2,300 psi. Pressure up on the tubing x casing annulus to 3,500 psi. Hold for 30 min. OK. Bleed tubing pressure to 0. Pressure up on tubing x casing annulus to 3,500 psi to shear DCK valve. Pump on well to verify shear valve open. OK. OTHCMP PJSM, R/U Little Red Services to freeze protect well. PT surface lines to 3,500 psi, OK. Pump 115 bbls diesel down the tubing x casing annulus ~ 2 bpm ICP 500 psi, FCP 900 psi.U-tube diesel to tubing. SIAP = 150 psi, SITP= 125 psi. Clear diesel from surface lines. R/D Little Red Services. OTHCMP R/U DSM high pressure lubricator. Set BPV. R/D iubricator.install VR plugs in well head annulus valves. OTHCMP Secure well head and tree for rig move. PRE PJSM. Prepare for rig move. Blow down lines with air. Un-pin blocks. Bridle up. Lower down cattle chute. Prepare to lower derrick. Release rig from operations on well V-203 at 00:00 hrs 02116!2006. rnntea: zrrue~ws io:oi:atinnn f 1 V-203 L2 S u ' , ' .:. Report ~~ Report Date: 29-Jan-06 Survey I DLS Computation Method: Minimum curvature I Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 20.000° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure /Slot: V-Pad !Plan V-203 (N-A) TVD Reference Datum: Rotary Table Well: V-203 TVD Reference Elevation: 81.20 ft relative to MSL Borehole: V-203L2 Sea Bed I Ground level Elevation: 52.70 ft relative to MSL UWI/API#: 500292328561 Magnetic Declination: 24.356° Survey Name /Date: V-203L2 (January 29, 2006 Total Field Strength: 57579.711 nT Tort I AHD I DDI I ERD ratio: 310.789° / 8352.35 ft / 6.792 ! 1.878 Magnetic Dip: 80.843° Grid Coordinate System: NAD27 Alaska State Planes,. Zone 04, US Feet Declination Date: _January 31, 2006 Location LaUlong: N 7019 40.471, W 149161.221 Magnetic Declination Model: BGGM 2005 Location Grid WE Y/X: N 5970046.490 ftUS, E 590380.870 ftUS North Reference: True North Grid Convergence Angle: +0.69021689° Total Corr Mag North -> True North: +24.356° Grid Scale Factor: 0.99990928 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS rsit u.uu u.uu u.uu -a~.zu u.uu u.vu u.uu v.uu u.vv u.uv u.vv by/VU40.4y oyuauv.rs/ IV /V I`J 4V.4/7 W 14`J Id 7."C"L7 CB GYRO SS 54.00 0.25 326.00 -27.20 54.00 0.07 0.12 0.12 0.10 -0.07 0.46 5970046.59 590380.80 N 70 19 40.472 W 149 16 1.223 162.00 0.50 115.00 80.80 162.00 0.17 0.56 0.25 0.09 0.23 0.67 5970046.59 590381.10 N 70 19 40.472 W 149 16 1.215 256.00 3.00 137.00 174.75 255.95 -0.99 3.41 2.95 •1.88 2.28 2.71 5970044.64 590383.17 N 70 19 40.452 W 149 16 1.155 349.00 3.50 143.00 267.60 348.80 -3.64 8.67 8.19 -5.93 5.65 0.65 5970040.63 590386.59 N 70 19 40.412 W 149 16 1.056 441.00 3.25 150.00 359.44 440.64 -6.84 14.08 13.54 -10.43 8.64 0.52 5970036.17 590389.64 N 70 19 40.368 W 149 16 0.969 Last CB GYRO SS 532.00 2.75 179.00 450.32 531.52 -10.54 18.75 17.88 -14.84 9.97 1.73 5970031.77 590391.02 N 70 19 40.325 W 149 16 0.930 First MWD+IFR+MS 572.65 2.65 201.89 490.93 572.13 -12.39 20.64 19.27 -16.69 9.64 2.65 5970029.92 590390.71 N 70 19 40.306 W 149 16 0.940 665.37 3.57 243.08 583.52 664.72 -16.64 25.46 20.95 -19.99 6.26 2.54 5970026.58 590387.37 N 70 19 40.274 W 149 16 1.038 757.12 3.64 275.25 675.10 756.30 -19.47 31.08 21.03 -21.01 0.81 2.18 5970025.49 590381.94 N 70 19 40.264 W 149 16 1.198 808.00 4.00 273.50 725.86 807.06 -20.38 34.47 20.92 -20.76 -2.57 0.74 5970025.70 590378.56 N 70 19 40.266 W 149 1 880.93 4.70 284.35 798.58 879.78 -21.40 39.98 21.41 -19.86 -8.00 1.48 5970026.53 590373.11 N 70 19 40.275 W 149 1 5 942.02 5.34 292.23 859.44 940.64 -21.54 45.32 22.37 -18.17 -13.06 1.54 5970028.17 590368.04 N 70 19 40.292 W 149 16 1.602 1035.95 8.34 301.48 952.69 1033.89 -20.01 56.48 26.32 -12.95 -22.91 3.39 5970033.26 590358.12 N 70 19 40.343 W 149 16 1.890 1129.14 11.32 305.21 1044.51 1125.71 -16.26 72.38 36.39 -4.15 -36.15 3.27 5970041.91 590344.77 N 70 19 40.430 W 149 16 2.277 1220.42 15.05 306.44 1133.36 1214.56 -10.56 93.20 53.62 8.06 -53.01 4.10 5970053.91 590327.77 N 70 19 40.550 W 149 16 2.769 1312.85 19.18 304.31 1221.68 1302.88 -3.41 120.39 78.88 23.75 -75.22 4.52 5970069.33 590305.38 N 70 19 40.704 W 149 16 3.417 1406.18 22.33 303.92 1308.95 1390.15 4.65 153.46 110.98 42.29 -102.60 3.38 5970087.54 590277.78 N 70 19 40.887 W 149 16 4.216 1499.98 28.05 305.47 1393.79 1474.99 14.83 193.37 150.20 65.05 -135.38 6.14 5970109.90 590244.73 N 7019 41.110 W 14916 5.173 1593.47 31.72 301.62 1474.84 1556.04 25.65 239.93 196.42 90.71 -174.22 4.43 5970135.08 590205.58 N 70 19 41.363 W 149 16 6.307 1689.37 31.97 302.09 1556.31 1637.51 36.04 290.53 246.90 117.41 -217.20 0.37 597016126 590162.29 N 70 19 41.625 W 149 16 7.562 1782.55 33.40 301.71 1634.73 1715.93 46.42 340.84 297.14 144.00 -259.92 1.55 5970187.33 590119.26 N 70 19 41.887 W 149 16 8.809 1875.33 34.45 304.35 1711.72 1792.92 58.10 392.62 348.80 172.23 -303.32 1.95 5970215.04 590075.53 N 70 19 42.164 W 149 16 10.076 SurveyEditor Ver SP 1.0 Bld( doc40x_56) Plan V•203 (N-A)\V-203\V-203L2\V-203L2 Generated 3/24/2006 2:55 PM Page 1 of 6 i 1 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure n de de n n ft n n ft ft de 100 n ftUS nUS 1969.24 37.94 304.82 1787.49 1868.69 72.07 448.07 404.07 203.71 -348.96 3.73 59/0245.96 590029.51 N 7U 19 42.474 W 149 16 11.409 2061.85 42.21 305.46 1858.34 1939.54 87.66 507.67 463.49 238.03 -397.69 4.63 5970279.69 589980.37 N 70 19 42.811 W 149 16 12.831 2155.32 47.01 305.75 1924.87 2006.07 105.32 573.30 525.92 276.24 -451.04 5.14 5970317.25 589926.57 N 70 19 43.187 W 149 16 14.389 2248.06 51.56 305.07 1985.35 2066.55 123.98 643.57 599.04 316.95 -508.33 4,94 5970357.26 589868.81 N 70 19 43.588 W 149 16 16.061 2341.42 56.07 304.38 2040.45 2121.65 143.11 718.90 674.30 359.85 -570.25 4.87 5970399.41 589806.38 N 70 19 44.009 W 149 16 17.869 2435.00 59.07 304.54 2090.63 2171.83 162.83 797.88 753.22 404.54 -635.37 3.21 5970443.31 589740.73 N 70 19 44.449 W 149 16 19.770 2529.21 59.08 304.99 2139.04 2220.24 183.43 878.70 833.98 450.62 -701.76 0.41 5970488.59 589673.80 N 70 19 44.902 W 14916 21.709 2623.51 58.33 305.29 2188.03 2269.23 204.48 959.28 914.49 497.00 -767.65 0.84 5970534.16 589607.36 N 7019 45.358 W 14916 23.633 2716.98 59.27 305.21 2236.45 2317.65 225.50 1039.23 994.38 543.14 -832.94 1.01 5970579.51 589541.52 N 70 19 45.812 W 149 16 25.539 2809.27 59.23 305.86 2283.64 2364.84 246.75 1118.54 1073.63 589.24 -897.49 0.61 5970624.82 589476.43 N 7019 46.265 W 149 16 27.423 2903.69 60.37 304.93 2331.13 2412.33 268.41 1200.14 1155.18 636.50 -964.01 1.48 5970671.28 589409.35 N 70 19 46.730 W 149 16 2997.80 60.19 304.36 2377.79 2458.99 289.07 1281.87 1236.90 682.97 -1031.25 0.56 5970716.92 589341.57 N 70 19 47.187 W 149 16 3090.94 60.53 302.57 2423.85 2505.05 307.92 1362.83 1317.84 727.60 -1098.78 1.71 5970760.74 589273.51 N 70 19 47.626 W 149 16 33.301 3184.76 59.75 303.25 2470.56 2551.76 326.09 1444.19 1399.20 771.81 -1167.08 1.04 5970804.11 589204.68 N 70 19 48.060 W 149 16 35.295 3277.97 59.38 301.47 2517.78 2598.98 343.30 1524.55 1479.55 814.82 -1234.96 1.69 5970846.30 589136.30 N 70 19 48.483 W 149 16 37.277 3370.51 59.75 300.94 2564.66 2645.86 358.80 1604.34 1559.28 856.16 -1303.21 0.64 5970886.81 589067.56 N 70 19 48.890 W 149 16 39.270 3478.73 58.70 300.75 2620.03 2701.23 376.30 1697.32 1652.18 903.83 -1383.04 0.98 5970933.51 588987.18 N 70 19 49.358 W 149 i6 41.601 3510.56 58.60 301.04 2636.59 2717.79 381.43 1724.50 1679.34 917.79 -1406.36 0.84 5970947.19 588963.69 N 70 19 49.496 W 149 16 42.282 3606.00 58.42 300.44 2686.45 2767.65 396.60 1805.89 1760.66 959.39 -1476.31 0.57 5970987.94 588893.25 N 70 19 49.905 W 149 16 44.324 3701.64 59.05 300.75 2736.08 2817.28 411.63 1887.64 1842.34 1001.00 -1546.68 0.71 5971028.69 588822.39 N 70 19 50.314 W 149 16 46.379 3797.08 58.65 301.14 2785.45 2866.65 427.14 1969.32 1923.97 1043.00 -1616,73 0.55 5971069.84 588751.84 N 70 19 50.727 W 149 16 48.425 3892.71 58.77 300.79 2835.12 2916.32 442.68 2051.04 2005.65 1085.04 -1686.81 0.34 5971111.03 588681.27 N 70 19 51.140 W 14916 50.471 3987.85 58.28 301.49 2884.79 2965.99 458.36 2132.18 2086.76 1127.00 -1756.26 0.81 5971152.15 588611.33 N 70 19 51.553 W 149 16 52.499 4083.32 59.05 302.98 2934.44 3015.64 475.64 2213.72 2168.30 1170.50 -1825.23 1.56 5971194.81 588541.85 N 70 19 51.980 W 149 16 54.513 4179.27 58.77 302.83 2983.99 3065.19 494.00 2295.89 2250.47 1215.14 -1894.21 0.32 5971238.61 588472.33 N 70 19 52.419 W 149 16 56.527 4275.30 59.57 303.12 3033.21 3114.41 5i 2.51 2378.35 2332.92 1260.02 -1963.39 0.87 5971282.65 588402.63 N 70 19 52.860 W 149 16 58.547 4367.74 59.02 302.44 3080.41 3161.61 530.09 2457.83 2412.40 1303.05 -2030.21 0.87 5971324.$7 588335.30 N 70 19 53.283 W 149 17 0.499 4460.44 59.45 302.67 3127.82 3209.02 547.41 2537.48 2492.06 1345.91 -2097.35 0.51 5971366.92 588267.66 N 70 19 53.705 W 149 1 9 4553.88 59.69 301.71 3175.15 3256.35 564.42 2618.05 2572.62 1388.83 -2165.53 0.92 5971409.01 588198.97 N 70 19 54.127 W 149 1 4647.31 59.55 301.12 3222.40 3303.60 580.37 2698.65 2653.20 1430.84 -2234.32 0.57 5971450.18 588129.69 N 70 19 54.540 W 149 1 9 4741.41 59.20 301.17 3270.34 3351.54 596.02 2779.63 2734.15 1472.72 -2303.62 0.37 5971491.22 588059.89 N 70 19 54.951 W 149 17 8.483 4834.50 58.61 302.36 3318.42 3399.62 612.27 2859.34 2813.85 1514.69 -2371.39 1.26 5971532.36 587991.62 N 70 19 55.364 W 149 17 10.462 4928.48 59.37 301.78 3366.83 3448.03 629.12 2939.89 2894.40 1557.45 -2439.65 0.97 5971574.30 587922.86 N 70 19 55.784 W 149 17 12.456 5021.57 59.92 302.05 3413.88 3495.08 645.70 3020.22 2974.72 1599.92 -2507.83 0.64 5971615.94 587854.18 N 7019 56.201 W 14917 14.447 5115.51 59.04 302.45 3461.58 3542.78 662.87 3101.14 3055.64 1643.10 -2576.27 1.01 5971658.29 587785.23 N 70 19 56.626 W 14917 16.446 5208.87 58.57 302.45 3509.94 3591.14 680:09 3181.00 3135.51 1685.95 -2643.67 0.50 5971700.32 587717.33 N 70 19 57.047 W 149 17 18.414 5302.94 58.31 303.02 3559.18 3640.38 697.76 3261.16 3215.66 1729.29 -2711.09 0.59 5971742.84 587649.40 N 70 19 57.473 W 149 17 20.383 5396.30 57.47 304.77 3608.80 3690.00 716.74 334023 3294.71 1773.39 -2776.73 1.82 5971786.14 587583.24 N 70 19 57.907 W 149 17 22.300 5489.49 57.42 309.34 3658.97 3740.17 739.77 3418.77 3372,99 1820.70 -2839.39 4.13 5971832.68 587520.02 N 70 19 58.372 W 149 17 24.131 5581.52 57.23 313.54 3708.67 3789.87 768.07 3496.22 3449.54 1871.95 -2897.44 3.85 5971883.23 587461.36 N 70 19 58.875 W 149 17 25.826 5675.08 59.29 315.98 3757.89 3839.09 801.40 3575.78 3527,42 1927.98 -2953.92 3.13 5971938.57 587404.22 N 70 19 59.426 W 149 17 27.476 SurveyEditor Ver SP 1.0 Bld( doc40x_56) Plan V-203 (N-A)\V-203\V-20312\V-203L2 Generated 3/24/2006 2:55 PM Page 2 of 6 G Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de /100 ft ftUS ftUS 5/ti/.5(i 5`J.11 :iltS.b4 ;~tSUb.'Cb Jtftfti.4b iS:i/./tS 3b5b.'LL :itiU4.bU lytiti.;il -3UU/.t3L L.;iy by/lyyb.L4 bt5/.S4y.bL N /U LV V.VVV VV 14`J t / Ly.U51 5861.46 58.95 322.80 3853.59 3934.79 878.84 3735.72 3681.45 2048.56 -3058.84 3.89 5972057.87 587297.86 N 70 20 0.612 W 149 17 30.541 5953.39 59.00 325.43 3900.97 3982.17 923.01 3814.50 3755.43 2112.38 -3105.01 2.45 5972121.12 587250.93 N 70 20 1.239 W 149 17 31.890 6046.33 60.44 330.23 3947.86 4029.06 972.24 3894.74 3829.06 2180.30 -3147.70 4.72 5972188.52 587207.43 N 70 20 1.907 W 149 17 33.138 6139.37 62.62 334.67 3992.22 4073.42 1027.44 3976.52 3901.59 2252.80 -3185.48 4.80 5972260.55 587168.78 N 70 20 2.620 W 149 17 34.242 6233.23 60.79 339.10 4036.73 4117.93 1087.73 4059.15 3972.19 2328.77 -3217.94 4.59 5972336.11 587135.41 N 70 20 3.367 W 149 17 35.191 6326.47 59.19 341.69 4083.37 4164.57 1149.91 4139.88 4038.99 2404.81 -3245.04 2.95 5972411.82 587107.40 N 70 20 4.115 W 149 17 35.983 6419.24 58.90 346.89 4131.11 4212.31 1214.47 4219.43 4102.15 24$1.35 -3266.58 4.82 5972488.09 587084.95 N 70 20 4.867 W 149 17 36.613 6512.05 60.93 350.24 4177.64 4258.84 1282.99 4299.72 4162.75 2560.05 -3282.47 3.81 5972566.58 587068.11 N 70 20 5.641 W 149 17 37.078 6604.80 62.91 355.08 4221.32 4302.52 1355.66 4381.54 4221.25 2641.18 -3292.89 5.07 5972647.57 587056.71 N 70 20 6.439 W 149 17 37.383 6698.56 65.73 357.97 4261.95 4343.15 1433.16 4466.03 4278.44 2725.50 -3297.98 4.09 5972731.82 587050.60 N 70 20 7.268 W 149 17 3 Tie-In Survey 6792.56 67.07 1.38 4299.59 4380.79 1513.92 4552.16 4334.17 2811.62 -3298.46 3.62 5972817.91 587049.09 N 70 20 8.115 W 149 17 3 .548 Top Window (Blind) 6832.00 68.11 2.46 4314.63 4395.83 1548.58 4588.62 4356.97 2848.06 -3297.24 3.66 5972854.36 587049.87 N 70 20 8.474 W 149 17 37.513 Base Window (Blind) 6844.00 70.01 2.16 4318.91 4400.11 1559.26 4599.83 4363.96 2859.26 -3296.78 16.00 5972865.56 587050.19 N 70 20 8.584 W 149 17 37.500 Inc+Trend 6862.41 71.14 2.75 4325.04 4406.24 1575.81 4617.19 4374.78 2876.60 -3298.04 6.84 5972882.92 587050.73 N 70 20 8.755 W 149 17 37.478 6899.33 74.10 3.89 4336,06 4417.26 1609.56 4652.42 4396.46 2911.77 -3294.00 8.54 5972918.11 587052.34 N 70 20 9.100 W 149 17 37.419 6930.06 77.31 4.82 4343.65 4424.85 1638.23 4682.19 4414.49 2941.46 -3291.73 10.85 5972947.82 587054.25 N 70 20 9.392 W 149 17 37.353 6961.20 80.42 5.74 4349.66 4430.86 1667.78 4712.74 4432.73 2971.88 -3288.92 10.40 5972978.26 587056.69 N 70 20 9.692 W 149 17 37.272 Last Inc_Trend 6992.43 83.64 6.64 4353.99 4435.19 1697.81 4743.67 4450.94 3002.63 -3285.59 10.70 5973009.04 587059.66 N 70 20 9.994 W 149 17 37.175 MW D+IFR+MS 7024.68 87.07 7.57 4356.61 4437.81 1729.14 4775.81 4469.59 3034.52 -3281.61 11.02 5973040.98 587063.25 N 70 20 10.308 W 149 17 37.059 7056.29 89.85 9.05 4357.46 4438.66 1760.08 4807.40 4487.54 3065.78 -3277.04 9.96 5973072.29 587067.44 N 70 20 10.615 W 149 17 36.926 7083.97 92.32 8.90 4356.93 4438.13 1787.24 4835.08 4503.12 3093.11 -3272.73 8.94 5973099.67 587071.43 N 70 20 10.884 W 149 17 36.800 7118.47 95.45 10.16 4354.59 4435.79 1821.08 4869.49 4522.38 3127.06 -3267.03 9.78 5973133.68 587076.71 N 70 20 11.218 W 149 17 36.634 7149.32 96.69 10.23 4351.33 4432.53 1851.31 4900.17 4539.41 3157.25 -3261.60 4.03 5973163.93 587081.78 N 70 20 11.515 W 149 17 36.476 7180.32 97.02 10.67 4347.63 4428.83 1881.66 4930.95 4556.52 3187.51 -3256.02 1.77 5973194.26 587087.00 N 70 20 11.813 W 149 17 36.313 7211.31 96.84 10.29 4343.89 4425.09 1912.00 4961.71 4573.76 3217.77 -3250.42 1,35 5973224.57 587092.23 N 70 20 12.110 W 149 17 36.150 7242.33 96.87 9.79 4340.19 4421.39 1942.33 4992.51 4591.35 3248.09 -3245.05 1.60 5973254.96 587097.23 N 70 20 12.408 W 149 17 35.994 7273.99 97.23 10.17 4336.30 4417.50 1973.28 5023.93 4609.46 3279.04 -3239.61 1.65 5973285.96 587102.30 N 70 20 12.713 W 149 17 5 7305.66 97.16 9.49 4332.34 4413.54 2004.20 5055.35 4627.79 3310.00 -323424 2.14 5973316.98 587107.29 N 70 20 13.017 W 149 179 7336.77 96.16 9.62 4328.73 4409.93 2034.59 5086.25 4646.06 3340.47 -3229.11 3.24 5973347.51 587112.05 N 70 20 13.317 W 149 17 0 7366.80 93.28 10.78 4326.26 4407.46 2064,08 5116.17 4663.62 3369.92 -3223.81 10.33 5973377.02 587117.00 N 70 20 13.607 W 149 17 35.375 7398.53 91.45 10.70 4324.95 4406.15 2095.37 5147.88 4682.11 3401.06 -3217.91 5.77 5973408.23 587122.53 N 70 20 13.913 W 149 17 35.203 7429.90 92.60 9.95 4323.84 4405.04 2126.27 5179.23 4700.72 3431.91 -321229 4.38 5973439.14 587127.78 N 70 20 14.216 W 149 17 35.039 7461.46 93.52 12.62 4322.16 4403.36 2157.42 5210.74 4719.14 3462.81 -3206.12 8.94 5973470.11 587133.57 N 70 20 14.520 W 149 17 34.860 7492.74 93.84 13.58 4320.15 4401.35 2188.41 5241.96 4736.71 3493.21 -3199.05 3.23 5973500.59 58714028 N 70 20 14.819 W 149 17 34.653 7523.43 92.27 14.17 4318.51 4399.71 2218.88 5272.60 4753.76 3522.96 -3191.70 5.46 5973530.43 587147.27 N 70 20 i 5.112 W 14917 34.439 7554.58 89.46 15.40 4318.04 4399.24 2249.89 5303.75 4770.81 3553.07 -3183.75 9.85 5973560.63 587154.85 N 70 20 15.408 W 149 17 34207 7585.73 88.96 15.61 4318.47 4399.67 2280.94 5334.89 4787.68 3583.09 -3175.42 1.74 5973590.74 587162.81 N 70 20 15.703 W 149 17 33.964 7616.70 89.61 16.82 4318.86 4400.06 2311.84 5365.86 4804.27 3612.82 -3166.78 4.43 5973620.57 587171.10 N 70 20 15.996 W 149 17 33.712 7648.51 89.97 18.63 4318.97 4400.17 2343.62 5397.67 4820.74 3643.12 -3157.09 5.80 5973650.98 587180.42 N 70 20 16.294 W 149 17 33.430 7679.61 90.12 19.48 4318.95 4400.15 2374.72 5428.77 4836.38 3672.52 -3146.94 2.78 5973680.49 587190.21 N 70 20 16.583 W 149 17 33.134 SurveyEditor Ver SP 1.0 Bld( doc4Ox_56) Plan V-203 (N-A)\V-203\V-2O3L2\V-2O3L2 Generated 3/24/2006 2:55 PM Page 3 of 6 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS 7711.55 90.04 22.09 4318.91 4400.11 2406.65 5460.71 4851.76 3702.38 -3135.61 8.18 5973710.48 587201.19 N 70 20 16.877 W 149 17 32.803 7742.06 90.19 21.92 4318.84 4400.04 2437.15 5491.22 4866.04 3730.66 -3124.17 0.74 5973738.91 587212.28 N 70 20 17.155 W 149 17 32.469 7773.23 88.30 21.07 4319.26 4400.46 2468.30 5522.39 4881.01 3759.66 -3112.75 6.65 5973768.04 587223.34 N 70 20 17.440 W 149 17 32.136 7804.52 88.37 20.40 4320.16 4401.36 2499.57 5553.66 4896.56 3788.91 -3101.68 2.15 5973797.42 587234.06 N 70 20 17.728 W 149 17 31.813 7835.40 88.68 21.43 4320.96 4402.16 2530.44 5584.53 4911.96 3817.75 -3090.66 3.48 5973826.38 587244.73 N 70 20 18.011 W 149 17 31.492 7866.49 88.07 20.90 4321.84 4403.04 2561.51 5615.61 4927.50 3846.73 -3079.44 2.60 5973855.49 587255.60 N 70 20 18.297 W 149 17 31.164 7896.85 87.94 21.89 4322.90 4404.10 2591.84 5645.95 4942.71 3874.98 -3068.37 3.29 5973883.87 587266.33 N 70 20 18.574 W 149 17 30.841 7927.53 88.08 22.46 4323.96 4405.16 2622.48 5676.61 4957.86 3903.37 -3056.80 1.91 5973912.40 587277.56 N 70 20 18.854 W 149 17 30.504 7958.01 88.83 22.32 4324.79 4405.99 2652.92 5707.08 4972.95 3931.54 -3045.19 2.50 5973940.70 587288.82 N 70 20 19.131 W 149 17 30.165 7989.62 87.59 21.76 4325.77 4406.97 2684.50 5738.67 4988.92 3960.83 -3033.34 4.30 5973970.13 587300.32 N 70 20 19.419 W 149 17 29.819 8020.25 86.79 22.50 4327.27 4408.47 2715.07 5769.27 5004.48 3989.17 -3021.81 3.56 5973998.60 587311.51 N 70 20 19.698 W 149 173 8051.07 87.29 22.17 4328.87 4410.07 2745.82 5800.05 5020.18 4017.64 -3010.12 1.94 5974027.21 587322.86 N 70 20 19.978 W 149 17 29.142 8081.93 89.03 22.18 4329.86 4411.06 2776.64 5830.89 5036.13 4046.20 -2998.48 5.64 5974055.90 587334.15 N 70 20 20.259 W 149 17 28.802 8113.22 88.64 22.54 4330.49 4411.69 2807.90 5862.17 5052.36 4075.13 -2986.57 1.70 5974084.97 587345.70 N 70 20 20.543 W 149 17 28.455 8145.28 89.25 22.26 4331.08 4412.28 2839.93 5894.23 5069.11 4104.77 -2974.36 2.09 5974114.75 587357.56 N 70 20 20.835 W 149 17 28.098 8175.27 89.28 22.31 4331.47 4412.67 2869.89 5924.21 5084.97 4132.51 -2962.99 0.19 5974142.63 587368.59 N 70 20 21.108 W 149 17 27.766 8206.21 90.55 21.24 4331.51 4412.71 2900.81 5955.15 5101.70 4161.24 -2951.51 5.37 5974171.50 587379.72 N 70 20 21.390 W 149 17 27.431 8237.45 91.32 20.31 4331.00 4412.20 2932.05 5986.39 5119.18 4190.45 -2940.43 3.86 5974200.83 587390.45 N 70 20 21.678 W 149 17 27.108 8268.03 90.71 20.60 4330.46 4411.66 2962.62 6016.97 5136.55 4219.10 -2929.75 2.21 5974229.60 587400.79 N 70 20 21.959 W 149 17 26.796 8298.68 91.47 20.96 4329.88 4411.08 2993.26 6047.61 5153.95 4247.75 -2918.87 2.74 5974258.38 587411.31 N 70 20 22.241 W 149 17 26.479 8330.01 90.63 19.40 4329.30 4410.50 3024.59 6078.93 5172.12 4277.15 -2908.07 5.65 5974287.90 587421.76 N 70 20 22.530 W 149 17 26.164 8360.99 89.17 17.77 4329.36 4410.56 3055.55 6109.91 5190.91 4306.51 -2898.20 7.06 5974317.38 587431.28 N 70 20 22.819 W 149 17 25.876 8392.16 90.29 18.08 4329.51 4410.71 3086.70 6141.08 5210.22 4336.17 -2888.60 3.73 5974347.15 587440.51 N 70 20 23.111 W 149 17 25.596 8423.36 90.41 17.40 4329.32 4410.52 3117.88 6172.28 5229.74 4365.88 -2879.10 2.21 5974376.97 587449.66 N 70 20 23.403 W 149 17 25.319 8454.67 87.84 17.60 4329.79 4410.99 3149.15 6203.58 5249.53 4395.74 -2869.68 8.23 5974406.93 587458.71 N 70 20 23.697 W 149 17 25.044 8484.90 86.56 18.80 4331.27 4412.47 3179.33 6233.78 5268.45 4424.42 -2860.25 5.80 5974435.73 587467.80 N 70 20 23.979 W 149 17 24.769 8516.46 87.29 18.69 4332.96 4414.16 3210.84 6265.29 5288.07 4454.26 -2850.13 2.34 5974465.69 587477.56 N 70 20 24.272 W 149 17 24.473 8546.76 85.79 19.02 4334.79 4415.99 3241.07 6295.54 5306.96 4482.88 -2840.35 5.07 5974494.42 587486.99 N 70 20 24.554 W 149 1 8 8578.18 85.94 19.65 4337.06 4418.26 3272.41 6326.87 5326.44 4512.45 -2829.98 2.06 5974524.11 587497.01 N 70 20 24.845 W 149 1 5 8610.05 86.63 19.33 4339.12 4420.32 3304.21 6358.68 5346.26 4542.43 -2819.37 2.39 5974554.21 587507.26 N 70 20 25.140 W 149 17 6 8640.72 85.30 19.76 4341.28 4422.48 3334.80 6389.27 5365.41 4571.26 -2809.13 4.56 5974583.16 587517.14 N 70 20 25.423 W 149 17 23.277 8671.61 85.11 19.71 4343.86 4425.06 3365.59 6420.05 5384.71 4600.24 -2798.74 0.64 5974612.26 587527.19 N 70 20 25.708 W 14917 22.974 8703.00 85.32 19.32 4346.48 4427.68 3396.87 6451.33 5404.52 4629.72 -2788.29 1.41 5974641.86 587537.28 N 70 20 25.998 W 149 17 22.669 8733.83 85.56 19.22 4348.93 4430.13 3427.60 6482.07 5424.19 4658.73 -2778.15 0.84 5974670.99 587547.07 N 70 20 26.284 W 149 17 22.373 8764.20 86.56 19.98 4351.02 4432.22 3457.89 6512.36 5443.55 4687.28 -2767.98 4.13 5974699.65 587556.89 N 70 20 26.564 W 149 17 22.076 8795.88 88.45 20.51 4352.40 4433.60 3489.54 6544.01 5463.61 4716.97 -2757.03 6.20 5974729.47 587567.48 N 70 20 26.856 W 149 17 21.757 8826.80 89.18 22.63 4353.04 4434.24 3520.44 6574.92 5482.74 4745.71 -2745.67 7.25 5974758.35 587578.50 N 70 20 27.139 W 149 17 21.425 8857.64 90.46 24.39 4353.13 4434.33 3551.22 6605.76 5501.12 4773.99 -2733.36 7.06 5974786.77 587590.45 N 70 20 27.417 W 149 17 21.066 8888.94 93.12 24.97 4352.16 4433.36 3582.40 6637.05 5519.35 4802.42 -2720.30 8.70 5974815.35 587603.17 N 70 20 27.697 W 149 17 20.685 8919.64 93.56 25.59 4350.37 4431.57 3612.91 6667.69 5537.07 4830.13 -2707.22 2.47 5974843.21 587615.92 N 70 20 27.970 W 14917 20.303 SurveyEditor Ver SP 1.0 Bld( doc4Ox_56) Plan V-203 (N-A)\V-203\V-2O3L2\V-2O3L2 Generated 3/24/2006 2:55 PM Page 4 of 6 i Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS 8950.LO 9V.99 24.98 4349.15 4430.35 3643.32 6698.23 5554.83 485/.74 -2694.1 7 8.64 5974870.97 587628.63 N 70 20 28.241 W 149 17 19.9L2 8981.38 88.68 24.71 4349.24 4430.44 3674.38 6729.41 5573.28 4886.03 -2681.07 7.46 5974899.42 587641.39 N 70 20 28.519 W 149 17 19.540 9012.28 88.90 24.21 4349.90 4431.10 3705.18 6760.30 5591.83 4914.15 -2668.28 1.77 5974927.69 587653.84 N 70 20 28.796 W 14917 19.166 9042.85 89.06 24.95 4350.44 4431.64 3735.65 6790.86 5610.25 4941.95 -2655.57 2.48 5974955.63 587666.21 N 70 20 29.069 W 149 17 18.795 9074.90 89.12 25.22 4350.95 4432.15 3767.57 6822.91 5629.44 4970.97 -2641.98 0.86 5974984.81 587679.45 N 70 20 29.355 W 149 17 18.399 9106.87 88.21 25.23 4351.70 4432.90 3799.40 6854.87 5648.64 4999.88 -2628.36 2.85 5975013.89 587692.72 N 70 20 29.639 W 149 17 18.001 9138.16 88.29 25.44 4352.65 4433.85 3830.54 6886.15 5667.49 5028.15 -2614.98 0.72 5975042.31 587705.76 N 70 20 29.917 W 14917 17.610 9168.25 88.49 25.91 4353.50 4434.70 3860.47 6916.22 5685.57 5055.26 -2601.95 1.70 5975069.57 587718.46 N 70 20 30.184 W 149 17 17.230 9199.65 88.25 26.07 4354.39 4435.59 3891.69 6947.61 5704.42 5083.47 -2588.19 0.92 5975097.95 587731.87 N 70 20 30.462 W 149 17 16.829 9231.84 88.32 25.64 4355.35 4436.55 3923.69 6979.79 5723.91 5112.43 -2574.16 1.35 5975127.06 587745.55 N 70 20 30.746 W 149 17 16.419 9262.72 88.26 24.62 4356.27 4437.47 3954.44 7010.65 5743.03 5140.37 -2561.05 3.31 5975155.16 587758.32 N 70 20 31.021 W 149 176 9294.48 88.44 24.58 4357.19 4438.39 3986.08 7042.40 5763.03 5169.24 -2547.84 0.58 5975184.18 587771.19 N 70 20 31.305 W 149 17 1 9325.42 89.65 26.04 4357.70 4438.90 4016.88 7073.33 5782.31 5197.20 -2534.61 6.13 5975212.30 587784.08 N 70 20 31.580 W 149 17 15.264 9356.90 89.12 25.65 4358.04 4439.24 4048.20 7104.81 5801.81 5225.53 -2520.89 2.09 5975240.79 587797.45 N 70 20 31.859 W 149 17 14.864 9387.79 88.53 25.29 4358.68 4439.88 4078.94 7135.70 5821.21 5253.41 -2507.61 2.24 5975268..83 587810.40 N 70 20 32.133 W 149 17 14.476 9418.90 88.71 24.33 4359.43 4440.63 4109.93 7166.80 5841.11 5281.64 -2494.56 3.14 5975297.21 587823.11 N 70 20 32.411 W 149 17 14.095 9450.29 89.05 23.03 4360.04 4441.24 4141.25 7198.18 5861.76 5310.38 -2481.95 4.28 5975326.10 587835.36 N 70 20 32.694 W 149 17 13.727 9481.31 90.60 23.63 4360.13 4441.33 4172.21 7229.20 5882.41 5338.86 -2469.67 5.36 5975354.72 587847.30 N 70 20 32.974 W 149 17 13.369 9511.40 90.63 23.40 4359.81 4441.01 4202.25 7259.29 5902.45 5366.45 -2457.66 0.77 5975382.46 587858.97 N 70 20 33.245 W 149 17 13.018 9543.35 90.71 23.93 4359.44 4440.64 4234.13 7291.24 5923.77 5395.72 -2444.84 1.68 5975411.87 587871.44 N 70 20 33.533 W 149 17 12.644 9574.26 91.33 22.75 4358.89 4440.09 4264.98 7322.14 5944.60 5424.09 -2432.60 4.31 5975440.38 587883.34 N 70 20 33.812 W 14917 12.286 9605.63 90.92 21.89 4358.27 4439.47 4296.32 7353.50 5966.24 5453.10 -2420.69 3.04 5975469.54 587894.90 N 70 20 34.097 W 149 17 11.939 9636.84 90.78 19.24 4357.81 4439.01 4327.52 7384.71 5988.54 5482.32 -2409.73 8.50 5975498.88 587905.51 N 70 20 34.385 W 149 17 11.619 9668.31 91.07 19.80 4357.30 4438.50 4358.99 7416.18 6011.50 5511.98 -2399.21 2.00 5975528.66 587915.66 N 70 20 34.676 W 149 17 11.312 9699.22 91.77 20.49 4356.53 4437.73 4389.89 7447.08 6033.89 5540.99 -2388.57 3.18 5975557.79 587925.95 N 70 20 34.962 W 149 17 11.001 9730.59 92.62 20.97 4355.33 4436.53 4421.23 7478.42 6056.46 5570.30 -2377.47 3.11 5975587.24 587936.69 N 70 20 35.250 W 149 17 10.677 9762.20 92.74 19.80 4353.85 4435.05 4452.80 7510.00 6079.40 5599.90 -2366.48 3.72 5975616.96 587947.33 N 70 20 35.541 W 149 17 10.356 9793.48 90.44 21.48 4352.99 4434.19 4484.07 7541.27 6102.10 5629.16 -2355.45 9.10 5975646.35 587958.00 N 70 20 35.829 W 149 17 10.035 9824.92 88.08 21,51 4353.39 4434.59 4515.49 7572.70 6124.67 5658.41 -2343.94 7.51 5975675.73 587969.16 N 70 20 36.117 W 149 1 8 9856.20 88.86 19.60 4354.23 4435.43 4546.76 7603.97 6147.56 5687.69 -2332.96 6.59 5975705.13 587979.79 N 70 20 36.405 W 149 1~8 9886.92 89.04 20.83 4354.79 4435.99 4577.47 7634.68 6170.23 5716.51 -2322.35 4.05 5975734.08 587990.05 N 70 20 36.688 W 149 17 9.068 9918.05 90.61 21.61 4354.89 4436.09 4608.59 7665.81 6192.91 5745.53 -2311.08 5.63 5975763.23 588000.97 N 70 20 36.974 W 149 17 8.739 9949.19 90.28 21.83 4354.64 4435.84 4639.72 7696.95 6215.49 5774.45 -2299.55 1.27 5975792.29 588012.14 N 70 20 37.258 W 149 17 8.403 9978.94 90.94 20.59 4354.33 4435.53 4669.46 7726.70 6237.30 5802.19 -2288.79 4.72 5975820.15 588022.57 N 70 20 37.531 W 149 17 8.089 10008.96 91.05 19.99 4353.81 4435.01 4699.47 7756.72 6259.70 5830.34 -2278.38 2.03 5975848.42 588032.64 N 70 20 37.808 W 149 17 7.785 10039.41 91.54 18.57 4353.12 4434.32 4729.91 7787.16 6282.84 5859.07 -2268.33 4.93 5975877.27 588042.34 N 70 20 38.091 W 149 17 7.491 10070.10 89.58 20.70 4352.82 4434.02 4760.60 7817.84 6306.10 5887.97 -2258.02 9.43 5975906.29 588052.30 N 70 20 38.375 W 149 17 7.191 10101.06 86.87 20.62 4353.78 4434.98 4791.54 7848.79 6329.26 5916.93 -2247.10 8.76 5975935.37 588062.87 N 70 20 38.660 W 149 17 6.872 10131.15 86.87 20.69 4355.42 4436.62 4821.58 7878.83 6351.81 5945.04 -2236.51 0.23 5975963.61 588073.12 N 70 20 38.936 W 149 17 6.562 10160.75 86.35 21.02 4357.17 4438.37 4851.13 7908.38 6373.98 5972.65 -2225.99 2.08 5975991.34 588083.31 N 70 20 39.208 W 149 17 6.255 10193.12 86.09 21.23 4359.30 4440.50 4883.42 7940.68 6398.18 6002.78 -2214.35 1.03 5976021.61 588094.59 N 70 20 39.504 W 149 17 5.915 SurveyEditor Ver SP 1.0 Bld( doc40x_56) Plan V-203 (N-A)\V-203\V-203L2\V-203L2 Generated 3/24/2006 2:55 PM Page 5 of 6 .~ Comments Measured Inclination Azimuth Sub-Sea ND TVp Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS IUZZb.3b 256.1yL1.3/ 4:iti1.4/ 444L.6/ 4ylb.b/ /y/Z.tl4 ti4GG.ZtS 6V:SL./4 -LNL.li/ 10257.92 86.57 21.33 4363.53 4444.73 4948.06 8005.34 6446.70 6063.02 -2190.83 10289.13 89.14 20.73 4364.70 4445.90 4979.24 8036.53 6470.30 6092.12 -2179.64 10320.92 89.29 22.83 4365.13 4446.33 5011.01 8068.31 6494.15 6121.64 -2167.85 10353.18 89.03 22.79 4365.61 4446.81 5043.23 8100.57 6518.04 6151.37 -2155.34 10384.56 90.16 22.71 4365.83 4447.03 5074.57 8131.95 6541.37 6180.31 -2143.21 10416.10 90.75 23.46 4365.58 4446.78 5106.07 8163.49 6564.77 6209.32 -2130.84 10446.52 90.69 23.71 4365.20 4446.40 5136.42 8193.91 6587.22 6237.20 -2118.67 10478.46 91.08 24.05 4364.70 4445.90 5168.29 8225.84 6610.75 6266.40 -2105.74 10509.96 90.00 24.86 4364.41 4445.61 5199.69 8257.34 6633.81 6295.08 -2092.70 10540.41 88.35 24.03 4364.84 4446.04 5230.04 8287.79 6656.17 6322.79 -2080.10 Last MWD+IFR+MS 1.0557.57 88.39 24.07 4365.33 4446.53 5247.15 8304.94 6668.87 6338.46 -2073.11 TD (Projected) 10605.00 88.39 24.07 4366.66 4447.86 5294.45 8352.35 6704.08 6381.75 -2053.78 Survey Type: Definitive Survey NOTES: CB GYRO SS - (Camera-based gyro single shots --Traditional surface referenced gyro tool run on wireli ne - including "level rotor" gyros and S perry-Sun SU3. Replaces ex-BP "PGSS" model. INC+TREND - (Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of drift to be predicted. Replaces ex-BP "Inclinometer (azimut h in known quadrant)" model. ) MWD+IFR-MS - (In-field referenced MWD with mull-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Description: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 4801 FSL 1921 FEL Si 1 T11 N Ri 1 E UM 5970046.49 590380.87 BHL : 622 FSL 3968 FEL S35 T12N R11 E UM 5976402.44 588250.56 U.b:i Sy/bUbl./V 5[StS1Ub.yV N /ULU:Sy./yy VV 14y 1/ 5.5/4 1.17 5976082.12 588117.37 N 70 20 40.097 W 149 17 5.229 8.46 5976111.35 588128.21 N 70 20 40.383 W 149 17 4.902 6.62 5976141.01 588139.65 N 70 20 40.673 W 14917 4.558 0.82 5976170.89 588151.79 N 70 20 40.966 W 149 17 4.193 3.61 5976199.96 588163.57 N 70 20 41.250 W 149 17 3.839 3.03 5976229.12 588175.59 N 70 20 41.536 W 149 17 3.478 0.85 5976257.14 588187.42 N 70 20 41.810 W 149 17 3.122 1.62 5976286.49 588200.00 N 70 20 42.097 W 149 17 2.745 4.29 5976315.32 588212.69 N 70 20 42.379 W 149 17 2.364 6.07 5976343.18 588224.95 N 70 20 42.652 W 149 1 0.33 5976358.93 588231.75 N 70 20 42.806 W 149 1 0.00 5976402.44 588250.56 N 70 20 43.232 W 149 17 227 • SurveyEditor Ver SP 1.0 Btd( doc40x_56) Plan V-203 (N-A)\V-203\V-203L2\V-203L2 Generated 3/24/2006 2:55 PM Page 6 of 6 v `TREE = FMC: d_ 1!R" 5M WELLHEAD = FMC GEN 5 ACTUATOR = KB. ELEV = 81.2' BF. ELEV = 52.7' KOP = 700 Max Angle=1191.8 ~ 7988' Datum MD = xxxx' Oatum ND = xxxx' SS V-2 V-20 1 V-203 L2 V-203 L3 V-203 L4 Final Completio DRLG DRAFT 2491' 4-1/2" HES X NP, D = 3.813" GAS LPT MANDRELS 20" CONDUCTOR -°109' 1o-3!a• CSG. 45.5 L-80. ID = 9.95° H 3434' (4.5"PHOENDC DSCHRGEPRESS SUB,D = 3.948" I 14.5" PHNDC AAULTI-PRESS SBVSOR, D = 3.994" RA TAG -j 6524' 7-5/8" x 5.5" BKR ZXP PACKER, D = 4.82" 6498' Seal Assemby from LEM#3 6698-6701 L4 BKR HUGHES HOOK HGR, ID = 5.62" 6543' Minimum ID = 3.688" @ 6543', 6727' 8< 6827' - LEM's RA TAG 7-5/8" x 5.5" BKR ZXP PACKER, D = 4.82" 6671' Seal Assernby from LEM#2 6796-6799 L3 BKR HUGHES HOOK IiGR, D = 5.62" 6744' I s7sa' I 7-5/8" x 5.5" BKR ZXP PACK62, ID = 4.82" 6769' Seal Assembry from LBuf<t1 6942-6945 L2 BKR HUGHES HOOK HGR D =.5.62" 6844" {7-518" x 5.5" BKR 2XP PACKER, ~ = 4.82" I RA TAG 7005' , 7-518" 29.7# L-80 BTGANSTL(6.875"D)-MB 7291' 4.5" 12.6# L-80 BTC Sbtted (3.958" D) 7286-7717' 4" x 6.4" Sw ep Packer 3.9° D 7777'-7787' 4.5" 12.6# L-80 BTC Sbtted (3.958" D) 7842-10617' 4.5" 12.6# L-80 BTGPT Sbtted/SoNd Liner Shoe - L1 - Obd 10619' ~ ~` r ~ ~ ~ ~ ~ ~ i i u ST MD ND DEV TYPE VLV LATCH PORT DATE 4 3054 2487 57 KBG-2 DMY BK 1" 02/18/06 3 5148 3559 58 KBG-2 DMY BK 1" 02/18/06 2 6072 4041 61 KBG-2 DMY BK 1" 02/18/06 1 6264 4133 60 KBG-2 DCK2 BEK 1" 02!18/06 6382' 4.5" Baker CMD-BX Sliding Sk:eve, 3.812" D 6428' 7.625" x 4.5" Premier Packer 3.87" D 6455' 4.5" HES X nipple W/ RHGM Plug, D 3.813" 6476' 4.5" HES X nipple, D 3.813" 6504' 4.5" Guide Shoe 6560'-6566' Hookw all Hanger bebw window - 3.99" D - L4 6598'-6608' 4" x 6.4" Sw etl Packer 3.9" D - L4 6622'-7320' 4.5" L-80 12.6# BTC Slotted Liner 3.958" D - L4 7337'-7349' 4" x 6.4" Sw ell Packer 3.9" ID - L4 7395'-10533' 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID - L4 10575' I--I 4.5" 12.6# L-80 IBT-M shoe (10,574' PBTD) - L4 6744'-6750' H Hookw aN Hanger below window - 3.99" ID - L3 6784'-6796' I-i 4" x 6.4" Swell Packer 3.9" D - L3 6810'-7183' 4.5" L-80 12.6# BTC Sbtted Liner 3.958" D - L3 7211-7222 4" x 6.4" Swell Packer 3.9" D - L3 7246-10534 4.5" L-80 12.6# BTC Sbtted Liner 3.958" D - L3 10576' 4.5" 12.6# L-80 PT-M shoe (10,574' PBTD) - L3 6844-6850 Hookw all Hanger below window - 3.99" D - L2 6881-6891 4" x 6.4" Swell Packer 3.9" D - L2 6921-10544 4.5" L-80 12.6# BTC Slotted liner 3.958" D - L2 10590' 4.5" 12.6# L-80 BT M shoe (10,588' PBTD) - L2 a~ -~- 7690' •-------•---- - ---- ....--~ (partially mlled w hilee drilling L1) - MB OBc 7732'-7745' 4" x 6.4" Swell Packer 3.9" D - MB OBc 7757'-8289' 4.5" 12.6# L-80 IBT soNd (3.958" D) - MB OBc 8306'-8316' 4" x 6.4" Swell Packer 3.9" D - MB OBc 8333'-10616'I~ 4.5" 12.6# L-80 BTC sbtted (3.958" D) - MB OBc 10620' i-~ 4.5' 12.6# L-80 BT shoe (10617' PBTD) -MB-Obc DATE REV BY COMMENTS DATE REV BY COMMENTS 02/18/06 jdf ORIGINAL COMPLETION 02/16/06 ORION UNIT 1 WELL: V-203, L1, L2, L3, L4 PERMff No: 205-168 (169) (170) (171) (172) i API No: 50-029-23285-00 (60) (61) (62) (63) SEC 11, T11N, R11E, 4801' NSL & 1920' WEL BP 6cploration (Alaska) (°' v-( i --~ SCHLUMBERGER Survey report Client ...................: BP Exploration (Alaska) Inc. Field ..................... Orion Well ...................... V-203L2 API number ...............: 50-029-23285-61 Engineer .................: St. Amour Rig :...................... Nabors 9ES STATE :.................... Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Pipe Tally GL above permanent.......: 52.70 ft KB above permanent.......: N/A (Top Drive) DF above permanent.......: 81.20 ft ----- Vertical section origin---------------- Latitude (+N/S-).......... 0.00 ft Departure (+E/W-)......... 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 20.00 degrees 29-Jan-2006 14:02:47 Page 1 of B Spud date ................. 8-Jan-06 Last survey date.........: 29-Jan-06 Total accepted surveys...: 199 MD of first survey.......: 0.00 ft MD of last survey........: 10605.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2005 Magnetic date.............: 21-Jan-2006 Magnetic field strength..: 1151.60 HCNT Magnetic dec (+E/W-).....: 24.37 degrees Magnetic dip .............: 80.84 degrees ----- MWD survey Reference Reference G ............... Reference H ............... Reference Dip ............. Tolerance of G............ Tolerance of H....... ... Tolerance of Dip.........: Criteria --------- 1002.68 meal 1151.60 HCNT 80.84 degrees (+/-) 2.50 meal (+/-) 6.00 HCNT (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 24.37 degrees Grid convergence (+E/W-).: 0.00 degrees Total az Corr (+E/W-)....: 24.37 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction SCHLUMBERGER Survey Report 29-Jan-2006 14:02:47 Page 2 of 8 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical --------- --------- Displ ------- ------- Displ ------- ------- Total -------- -------- At ----- ----- DLS ----- ------ ----- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) --------- (ft) ------- (f t) ------- (deg) -------- 100f) ----- type (deg) ----- ------ --- 1 -------- 0.00 ------ 0.00 ------- 0.00 ------ 0.00 -------- 0.00 -------- 0.00 --------- 0.00 ------- 0.00 ------- 0.00 -------- 0.00 ----- 0.00 ----- ------ TIP None 2 54.00 0.25 326.00 54.00 54.00 0.07 0.10 -0.07 0.12 326.00 0.46 BP_CB GYRO SS 3 162.00 0.50 115.00 108.00 162.00 0.17 0.09 0.23 0.25 67.75 0.67 BP_CB GYRO SS 4 256.00 3.00 137.00 94.00 255.95 -0.99 -1.88 2.28 2.95 129.50 2.71 BP_CB GYRO SS 5 349.00 3.50 143.00 93.00 348.80 -3.64 -5.93 5.65 8.19 136.38 0.65 BP CB GYRO SS 6 441.00 3.25 150.00 92.00 440.64 -6.84 -10.43 8.64 7 532.00 2.75 179.00 91.00 531.52 -10.54 -14.84 9.97 8 572.65 2.65 201.89 40.65 572.13 -12.39 -16.69 9.64 9 665.37 3.57 243.08 92.72 664.72 -16.64 -19.99 6.26 10 757.12 3.64 275.25 91.75 756.30 -19.47 -21.01 0.81 11 808.00 4.00 273.50 50.88 807.06 -20.38 -20.76 -2.57 12 880.93 4.70 284.35 72.93 879.78 -21.40 -19.86 -8.00 13 942.02 5.34 292.23 61.09 940.64 -21.54 -18.17 -13.06 14 1035.95 8.34 301.48 93.93 1033.89 -20.01 -12.95 -22.91 15 1129.14 11.32 305.21 93.19 1125.71 -16.26 -4.15 -36.15 16 1220.42 15.05 306.44 91.28 1214.56 -10.56 8.06 -53.01 17 1312.85 19.18 304.31 92.43 1302.88 -3.41 23.75 -75.22 18 1406.18 22.33 303.92 93.33 1390.15 4.65 42.29 -102.60 19 1499.98 28.05 305.47 93.80 1474.99 14.83 65.05 -135.38 20 1593.47 31.72 301.62 93.49 1556.04 25.65 90.71 -174.22 21 1689.37 31.97 302.09 95.90 1637.51 36.04 117.41 -217.20 22 1782.55 33.40 301.71 93.18 1715.93 46.42 144.00 -259.92 23 1875.33 34.45 304.35 92.78 1792.92 58.10 172.23 -303.32 24 1969.24 37.94 304.82 93.91 1868.69 72.07 203.71 -348.96 25 2061.85 42.21 305.46 92.61 1939.54 87.66 238.03 -397.69 26 2155.32 47.01 305.75 93.47 2006.07 105.32 276.24 -451.04 27 2248.06 51.56 305.07 92.74 2066.54 123.98 316.95 -508.33 28 2341.42 56.07 304.38 93.36 2121.65 143.11 359.85 -570.25 29 2435.00 59.07 304.54 93.58 2171.83 162.83 404.54 -635.37 30 2529.21 59.08 304.99 94.21 2220.24 183.43 450.62 -701.76 13.54 140.35 17.88 146.11 19.27 150.00 20.95 162.60 21.03 177.78 20.92 187.04 21.41 201.94 22.37 215.70 26.32 240.52 36.39 263.45 53.62 278.64 78.88 287.53 110.98 292.40 150.20 295.67 196.42 297.50 246.90 298.39 297.14 298.99 348.80 299.59 404.07 300.28 463.49 300.90 528.92 301.49 599.04 301..94 674.30 302.25 753.22 302.49 833.98 302.71 0.52 BP_CB GYRO SS 1.73 BP_CB GYRO SS 2.65 BP_CB GYRO SS 2.54 BP_CB GYRO SS 2.18 BP MWD+IFR+MS 0.74 BP_CB GYRO SS 1.48 BP_MWD+IFR+MS 1.54 BP_MWD+IFR+MS 3.39 BP_MWD+IFR+MS 3.27 BP MWD+IFR+MS 4.10 BP_MWD+IFR+MS 4.52 BP_MWD+IFR+MS 3.38 BP_MWD+IFR+MS 6.14 BP_MWD+IFR+MS 4.43 BP MWD+IFR+MS 0.37 BP_MWD+IFR+MS 1.55 BP_MWD+IFR+MS 1.95 BP_MWD+IFR+MS 3.73 BP_MWD+IFR+MS 4.63 BP MWD+IFR+MS 5.14 BP_MWD+IFR+MS 4.94 BP_MWD+IFR+MS 4.87 BP_MWD+IFR+MS 3.21 BP_MWD+IFR+MS 0.41 BP MWD+IFR+MS • SCHLUMBERGER Survey Report 29-Jan-2006 14:02:47 Page 3 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S - +E/W- displ Azim (deg/ tool Corr - (f t) (deg) (deg) (f t) (f t) (ft) (f t) (ft) (ft) (deg) 100f) type (deg) 31 2623.51 58.33 305.29 94.30 2269.23 204.48 497.00 -767.65 914.49 302.92 0.84 BP MWD+IFR+MS 32 2716.98 59.27 305.21 93.47 2317.65 225.50 543.14 -832.94 994.38 303.11 1.01 BP _ MWD+IFR+MS 33 2809.27 59.23 305.86 92.29 2364.84 246.75 589.24 -897.49 1073.63 303.29 0.61 BP _ MWD+IFR+MS 34 2903.69 60.37 304.93 94.42 2412.33 268.41 636.50 -964.01 1155.18 303.44 1.48 BP _ MWD+IFR+MS 35 2997.80 60.19 304.36 94.11 2458.99 289.07 682.97 -1031.25 1236.90 303.52 0.56 BP _ MWD+IFR+MS 36 3090.94 60.53 302.57 93.14 2505.05 307.92 727.60 -1098.78 1317.84 303.51 1.71 BP MWD+IFR+MS 37 3184.76 59.75 303.25 93.82 2551.76 326.09 771.81 -1167.08 1399.20 303.48 1.04 BP _ MWD+IFR+MS 38 3277.97 59.38. 301.47 93.21 2598.98 343.30 814.82 -1234.96 1479.55 303.42 1.69 BP _ MWD+IFR+MS 39 3370.51 59.75 300.94 92.54 2645.86 358.80 856.16 -1303.21 1559.28 303.30 0.64 BP _ MWD+IFR+MS 40 3478.73 58.70 300.75 108.22 2701.23 376.30 903.83 -1383.04 1652.18 303.17 0.98 BP _ MWD+IFR+MS 41 3510.56 58.60 301.04 31.83 2717.79 381.43 917.79 -1406.36 1679.34 303.13 0.84 BP MWD+IFR+MS 42 3606.00 58.42 300.44 95.44 2767.65 396.60 959.39 -1476.31 1760.66 303.02 0.57 BP _ MWD+IFR+MS 43 3701.64 59.05 300.75 95.64 2817.28 411.63 1001.00 -1546.68 1842.34 302.91 0.71 BP MWD+IFR+MS 44 3797.08 58.65 301.14 95.44 2866.65 427.14 .1043.00 -1616.73 1923.97 302.83 0.55 BP _ MWD+IFR+MS 45 3892.71 58.77 300.79 95.63 2916.32 442.6$ 1085.04 -1686.81 2005.65 302.75 0.34 BP _ MWD+IFR+MS 46 3987.85 58.28 301.49 95.14 2965.99 458.36 1127.00 -1756.26 2086.76 302.69 0.81 BP MWD+IFR+MS 47 4083.32 59.05 302.98 95.47 3015.64 475.64 1170.50 -1825.23 2168.30 302.67 1.56 BP _ MWD+IFR+MS 48 4179.27 58.77 302.83 95.95 3065.19 494.00 1215.14 -1894.21 2250.47 302.68 0.32 BP _ MWD+IFR+MS 49 4275.30 59.57 303.12 96.03 3114.41 512.51 1260.02 -1963.39 2332.92 302.69 0.87 BP _ MWD+IFR+MS 50 4367.74 59.02 302.44 92.44 3161.61 530.09 1303.05 -2030.21 2412.40 302.69 0.87 BP _ MWD+IFR+MS 51 4460.44 59.45 302.67 92.70 3209.02 547.41 1345.91 -2097.35 2492.06 302.69 0.51 BP MWD+IFR+MS 52 4553.88 59.69 301.71 93.44 3256.35 564.42 1388.83 -2165.53 2572.62 302.67 0.92 BP _ MWD+IFR+MS 53 4647.31 59.55 301.12 93.43 3303.60 580.37 1430.84 -2234.32 2653.20 302.64 0.57 BP _ MWD+IFR+MS 54 4741.41 59.20 301.17 94.10 3351.54 596.02 1472.72 -2303.62 2734.15 302.59 0.37 BP _ MWD+IFR+MS 55 4834.50 58.61 302.36 93.09 3399.62 612.27 1514.69 -2371.39 2813.85 302.57 1.26 BP _ MWD+IFR+MS 56 4928.48 59.37 301.78 93.98 3448.03 629.12 1557.45 -2439.65 2894.40 302.55 0.97 BP MWD+IFR+MS 57 5021.57 59.92 302.05 93.09 3495.08 645.70 1599.92 -2507.83 2974.72 302.54 0.64 BP _ MWD+IFR+MS 58 5115.51 59.04 302.45 93.94 3542.78 662.87 1643.10 -2576.27 3055.64 302.53 1.01 BP _ MWD+IFR+MS 59 5208.87 58.57 302.45 93.36 3591.14 680.09 1685.95 -2643.67 3135.51 302..53 0.50 BP _ MWD+IFR+MS 60 5302.94 58.31 303.02 94.07 3640.38 697.76 1729.29 -2711.09 3215.66 302.53 0.59 BP _ MWD+IFR+MS SCHLUMBERGER Survey Report 29-Jan-2006 14:02:47 Page 4 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ - - Total -- --- - At ----- DLS - ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (f t) (deg) 100f) type (deg) 61 5396.30 57.47 304.77 93.36 3690.00 716.74 1773.38 -2776.73 3294.71 302.56 1.82 BP MWD+IFR+MS 62 5489.49 57.42 309.34 93.19 3740.17 739.77 1820.70 -2839.39 3372.99 302.67 4.13 BP _ MWD+IFR+MS 63 5581.52 57.23 313.54 92.03 3789.87 768.07 1871.95 -2897.44 3449.54 302.87 3.85 BP _ MWD+IFR+MS 64 5675.08 59.29 315.98 93.56 3839.09 801.40 1927.98 -2953.92 3527.42 303.13 3.13 BP _ MWD+IFR+MS 65 5767.56 59.11 318.54 92.48 3886.45 837.78 1986.31 -3007.82 3604.50 303.44 2.39 BP _ MWD+IFR+MS 66 5861.46 58.95 322.80 93.90 3934.79 878.84 2048.56 -3058.84 3681.45 303.81 3.89 BP _MWD+IFR+MS 67 5953.39 59.00 325.43 91.93 3982.17 923.01 2112.38 -3105.01 3755.43 304.23 2.45 BP MWD+IFR+MS 68 6046.33 60.44 330.23 92.94 4029.06 972.24 2180.30 -3147.70 3829.06 304.71 4.72 BP - MWD+IFR+MS 69 6139.37 62.62 334.67 93.04 4073.42 1027.44 2252.80 -3185.48 3901.59 305.27 4.80 BP _ MWD+IFR+MS 70 6233.23 60.79 339.10 93.86 4117.93 1087.73 2328.77 -3217.94 3972.19 305.89 4.59 BP _ MWD+IFR+MS 71 6326.47 59.19 341.69 93.24 4164.57 1149.91 2404.81 -3245.04 4038.99 306.54 2.95 BP MWD+IFR+MS 72 6419.24 58.90 346.89 92.77 4212.31 1214.47 2481.35 -3266.58 4102.15 307.22 4.82 BP _ _MWD+IFR+MS 73 6512.05 60.93 350.24 92.81 4258.84 1282.99 2560.05 -3282.47 4162.75 307.95 3.81 BP MWD+IFR+MS 74 6604.80 62.91 355.08 92.75 4302.52 1355.66 2641.18 -3292.89 4221.25 308.73 5.07 BP _ MWD+IFR+MS 75 6698.56 65.73 357.97 93.76 4343.15 1433.16 2725.50 -3297.98 4278.44 309.57 4.09 BP _ MWD+IFR+MS 76 6792.56 67.07 1.38 94.00 4380.79 1513.92 2811.62 -3298.46 4334.17 310.44 3.62 BP MWD+IFR+MS 77 6832.00 68.11 2.46 39.44 4395.83 1548.58 2848.06 -3297.24 4356.97 310.82 3.66 BP _ INC+BLIND 78 6844.00 70.01 2.16 12.00 4400.11 1559.26 2859.26 -3296.78 4363.96 310.93 16.00 BP _ INC+BLIND 79 6862.41 71.14 2.75 18.41 4406.24 1575.81 2876.60 -3296.04 4374.78 311.11 6.84 BP _ INC+BLIND 80 6899.33 74.10 3.89 36.92 4417.26 1609.56 2911.77 -3294.00 4396.46 311.48 8.54 BP _ INC+BLIND 81 6930.06 77.31 4.82 30.73 4424.85 1638.23 2941.46 -3291.73 4414.49 311.78 10.85 BP INC+BLIND . 82 6961.20 80.42 5.74 31.14 4430.86 1667.78 2971.88 -3288.92 4432.73 312.10 10.40 BP _ INC+BLIND 83 6992.43 83.64 6.64 31.23 4435.19 1697.81 3002.62 -3285.59 4450.94 312.42 10.70 BP _ INC+BLIND 84 7024.68 87.07 7.57 32.25 4437.81 1729.14 3034.52 -3281.61 4469.59 312.76 11.02 BP _ MWD+IFR+MS 85 7056.29 89.85 9.05 31.61 4438.65 1760.08 3065.76 -3277.04 4487.54 313.09 9.96 BP _ MWD+IFR+MS 86 7083.97 92.32 8.90 27.68 4438.13 1787.24 3093.11 -3272.73 4503.12 313.38 8.94 BP MWD+IFR+MS 87 7118.47 95.45 10.16 34.5 0 4435.79 1821.08 3127.05 -3267.03 4522.38 313.75 9.78 BP _ MWD+IFR+MS 88 7149.32 96.69 10.23 30.85 4432.53 1851.31 3157.25 -3261.60 4539.41 314.07 4.03 BP _ _MWD+IFR+MS 89 7180.32 97.02 10.67 31.00 4428.83 1881.66 3187.51 -3256.02 4556.52 314.39 1.77 BP _MWD+IFR+MS 90 7211.31 96.84 10.29 30.99 4425.09 1912.00 3217.76 -3250.42 4573.76 314.71 1.35 BP MWD+IFR+MS SCHLUMBERGER Survey Report 29-Jan-2006 14:02:47 Page S of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S - +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (f t) (deg) 100f) type (deg) 91 7242.33 96.87 9.79 31.02 4421.39 1942.33 3248.09 -3245.05 4591.35 315.03 1.60 BP MWD+IFR+MS 92 7273.99 97.23 10.17 31.66 4417.50 1973.28 3279.04 -3239.61 4609.46 315.35 1.65 BP _ MWD+IFR+MS 93 7305.66 97.16 9.49 31.67 4413.54 2004.20 3310.00 -3234.24 4627.79 315.66 2.14 BP _ MWD+IFR+MS 94 7336.77 96.16 9.62 31.11 4409.93 2034.59 3340.47 -3229.11 4646.06 315.97 3.24 BP _ MWD+IFR+MS 95 7366.80 93.28 10.78 30.03 4407.46 2064.08 3369.92 -3223.81 4663.62 316.27 10.33 BP _ MWD+IFR+MS 96 7398.53 91.45 10.70 31.73 4406.15 2095.37 3401.06 -3217.91 4682.11 316.59 5.77 BP MWD+IFR+MS 97 7429.90 92.60 9.95 31.37 4405.04 2126.27 3431.91 -3212.29 4700.72 316.89 4.38 BP _ MWD+IFR+MS 98 7461.46 93.52 12.62 31.56 4403.36 2157.42 3462.81 -3206.12 4719.14 317.20 8.94 BP _ MWD+IFR+MS 99 7492.74 93.84 13.58 31.28 4401.35 2188.41 3493.21 -3199.05 4736.71 317.52 3.23 BP _ MWD+IFR+MS 100 7523.43 92.27 14.17 30.69 4399.71 2218.88 3522.96 -3191.70 4753.76 317.82 5.46 BP _ MWD+IFR+MS 101 7554.58 89.46 15.40 31.15 4399.24 2249.89 3553.07 -3183.75 4770.81 318.14 9.85 BP MWD+IFR+MS 102 7585.73 88.96 15.61 31.15 4399.67 2280.94 3583.09 -3175.42 4787.67 318.45 1.74 BP _ MWD+IFR+MS 103 7616.70 89.61 16.82 30.97 4400.06 2311.84 3612.82 -3166.78 4804.26 318.76 4.43 BP _ MWD+IFR+MS 104 7648.51 89.97 18.63 31.81 4400.17 2343.62 3643.12 -3157.09 4820.74 319.09 5.80 BP _ MWD+IFR+MS 105 7679.61 90.12 19.48 31.10 4400.15 2374.72 3672.52 -3146.94 4836.38 319.41 2.78 BP _ MWD+IFR+MS 106 7711.55 90.04 22.09 31.94 4400.11 2406.65 3702.37 -3135.61 4851.76 319.74 8.18 BP MWD+IFR+MS 107 7742.06 90.19 21.92 30.51 4400.04 2437.15 3730.66 -3124.17 4866.04 320.06 0.74 BP _ _MWD+IFR+MS 108 7773.23 88.30 21.07 31.17 4400.46 2468.30 3759.66 -3112.75 4881.01 320.38 6.65 BP MWD+IFR+MS 109 7804.52 88.37 20.40 31.29 4401.36 2499.57 3788.91 -3101.68 4896.56 320.70 2.15 BP _ MWD+IFR+MS 110 7835.40 88.68 21.43 30.88 4402.16 2530.44 3817.75 -3090.66 4911.96 321.01 3.48 BP _ MWD+IFR+MS 111 7866.49 88.07 20.90 31.09 4403.04 2561.51 3846.73 -3079.44 4927.50 321.32 2.60 BP MWD+IFR+MS 112 7896.85 87.94 21.89 30.36 4404.10 2591.84 3874.98 -3068.37 4942.71 321.63 3.29 BP _ MWD+IFR+MS 113 7927.53 88.08 22.46 30.68 4405.16 2622.48 3903.37 -3056.80 4957.85 321.93 1.91 BP _ MWD+IFR+MS 114 7958.01 88.83 22.32 30.48 4405.99 2652.92 3931.54 -3045.19 4972.95 322.24 2.50 BP _ MWD+IFR+MS 115 7989.62 87.59 21.76 31.61 4406.97 2684.50 3960.83 -3033.34 4988.92 322.55 4.30 BP _ MWD+IFR+MS 116 8020.25 86.79 22.50 30.63 4408.47 2715.07 3989.17 -3021.81 5004.48 322.86 3.56 BP MWD+IFR+MS 117 8051.07 87.29 22.17 30.82 4410.07 2745.82 4017.64 -3010.12 5020.18 323.16 1.94 BP _ MWD+IFR+MS 118 8081.93 89.03 22.18 30.86 4411.06 2776.64 4046.20 -2998.48 5036.13 323.46 5.64 BP _ MWD+IFR+MS 119 8113.22 88.64 22.54 31.29 4411.69 2807.90 4075.13 -2986.57 5052.36 323.76 1.70 BP _ _MWD+IFR+MS 120 8145.28 89.25 22.26 32.06 4412.28 2839.93 4104.77 -2974.36 5069.11 324.07 2.09 BP MWD+IFR+MS ., • SCHLUMBERGER Survey Report 29-Jan-2006 14:02:47 Page 6 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 8175.27 89.28 22.31 29.99 4412.67 2869.89 4132.51 -2962.99 5084.97 324.36 0.19 BP MWD+IFR+MS 122 8206.21 90.55 21.24 30.94 4412.71 2900.81 4161.24 -2951.51 5101.70 324.65 5.37 BP _ MWD+IFR+MS 123 8237.45 91.32 20.31 31.24 4412.20 2932.05 4190.45 -2940.43 5119.18 324.94 3.86 BP _ _MWD+IFR+MS 124 8268.03 90.71 20.60 30.58 4411.66 2962.62 4219.10 -2929.75 5136.55 325.22 2.21 BP MWD+IFR+MS 125 8298.68 91.47 20.96 30.65 4411.08 2993.26 4247.75 -2918.87 5153.95 325.50 2.74 BP _ MWD+IFR+MS 126 8330.01 90.63 19.40 31.33 4410.51 3024.59 4277.15 -2908.07 5172.12 325.79 5.65 BP _MWD+IFR+MS 127 8360.99 89.17 17.77 30.98 4410.56 3055.56 4306.51 -2898.20 5190.91 326.06 7.06 BP MWD+IFR+MS 128 8392.16 90.29 18.08 31.17 4410.71 3086.70 4336.17 -2888.60 5210.22 326.33 3.73 BP - MWD+IFR+MS 129 8423.36 90.41 17.40 31.20 4410.52 3117.88 4365.88 -2879.10 5229.74 326.60 2.21 BP _ _MWD+IFR+MS 130 8454.67 87.84 17.60 31.31 4410.99 3149.15 4395.74 -2869.68 5249.53 326.86 8.23 BP MWD+IFR+MS 131 8484.90 86.56 18.80 30.23 4412.47 3179.33 4424.42 -2860.25 5268.45 327.12 5.80 BP MWD+IFR+MS 132 8516.46 87.29 18.69 31.56 4414.16 3210.84 4454.26 -2850.13 5288.07 327.39 2.34 BP _ MWD+IFR+MS 133 8546.76 85.79 19.02 30.30 4415.99 3241.07 4482.88 -2840.35 5306.96 327.64 5.07 BP _ _MWD+IFR+MS 134 8578.18 85.94 19.65 31.42 4418.26 3272.41 4512.45 -2829.98 5326.44 327.91 2.06 BP MWD+IFR+MS 135 8610.05 86.63 19.33 31.87 4420.32 3304.21 4542.43 -2819.37 5346.26 328.17 2.39 BP _ MWD+IFR+MS 136 8640.72 85.30 19.76 30.67 4422.48 3334.80 4571.26 -2809.13 5365.41 328.43 4.56 BP MWD+IFR+MS 137 8671.61 85.11 19.71 30.89 4425.06 3365.59 4600.24 -2798.74 5384.71 328.68 0.64 BP _ MWD+IFR+MS 138 8703.00 85.32 19.32 31.39 4427.68 3396.87 4629.72 -2788.29 5404.52 328.94 1.41 BP _ MWD+IFR+MS 139 8733.83 85.56 19.22 30.83 4430.13 3427.60 4658.73 -2778.14 5424.19 329.19 0.84 BP _ _MWD+IFR+MS 140 8764.20 86.56 19.98 30.37 4432.22 3457.89 4687.28 -2767.98 5443.55 329.44 4.13 BP MWD+IFR+MS 141 8795.88 88.45 20.51 31.68 4433.60 3489.54 4716.97 -2757.03 5463.61 329.69 6.20 BP MWD+IFR+MS 142 8826.80 89.18 22.63 30.92 4434.24 3520.44 4745.71 -2745.67 5482.74 329.95 7.25 BP _ MWD+IFR+MS 143 8857.64 90.46 24.39 30.84 4434.33 3551.22 4773.99 -2733.36 5501.12 330.21 7.06 BP _ MWD+IFR+MS 144 8888.94 93.12 24.97 31.30 4433.36 3582.40 4802.42 -2720.30 5519.35 330.47 8.70 BP _ MWD+IFR+MS 145 8919.64 93.56 25.59 30.70 4431.57 3612.92 4830.13 -2707.21 5537.07 .330.73 2.47 BP _ MWD+IFR+MS 146 8950.20 90.99 24.98 30.56 4430.36 3643.32 4857.74 -2694.17 5554.83 330.99 8.64 BP MWD+IFR+MS 147 8981.38 88.68 24.71 31.18 4430.45 3674.39 4886.03 -2681.07 5573.28 331.25 7.46 BP _ MWD+IFR+MS 148 9012.28 88.90 24.21 30.90 4431.10 3705.19 4914.15 -2668.28 5591.83 331.50 1.77 BP _ _MWD+IFR+MS 149 9042.65 89.06 24.95 30.57 4431.64 3735.65 4941.95 -2655.57 5610.25 331.75 2.48 BP _MWD+IFR+MS 150 9074.90 89.12 25.22 32.05 4432.15 3767.57 4970.97 -2641.98 5629.44 332.01 0.86 BP MWD+IFR+MS r SCHLUMBERGER Survey Rep ort 29-Jan-2006 14:02:4 7 Page 7 of 8 Seq Measured Intl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (f t) (ft) (ft) (f t) (ft) (ft) (deg) 100f) type (deg) 151 9106.87 88.21 25.23 31.97 4432.90 3799.40 4999.88 -2628.36 5648.64 332.27 2.85 BP MWD+IFR+MS 152 9138.16 88.29 25.44 31.29 4433.85 3830.54 5028.15 -2614.98 5667.49 332.52 0.72 BP _ MWD+IFR+MS 153 9168.25 88.49 25.91 30.09 4434.70 3860.47 5055.26 -2601.95 5685.57 332.77 1.70 BP _ _MWD+IFR+MS 154 9199.65 88.25 26.07 31.40 4435.59 3891.69 5083.47 -2588.19 5704.42 333.02 0.92 BP _MWD+IFR+MS 155 9231.84 88.32 25.64 32.19 4436.55 3923.69 5112.43 -2574.16 5723.91 333.27 1.35 BP MWD+IFR+MS 156 9262.72 88.26 24.62 30.88 4437.47 3954.44 5140.37 -2561.05 5743.03 333.52 3.31 BP _MWD+IFR+MS 157 9294.48 88.44 24.58 31.76 4438.39 3986.08 5169.24 -2547.84 5763.03 333.76 0.58 BP _MWD+IFR+MS 158 9325.42 89.65 26.04 30.94 .4438.90 4016.88 5197.20 -2534.61 5782.31 334.00 6.13 BP _MWD+IFR+MS 159 9356.90 89.12 25.65 31.48 4439.24 4048.20 5225.53 -2520.89 5801.81 334.25 2.09 BP MWD+IFR+MS 160 9387.79 88.53 25.29 30.89 4439.88 4078.94 5253.41 -2507.61 5821.21 334.48 2.24 BP _ MWD+IFR+MS 161 9418.90 88.71 24.33 31.11 4440.62 4109.93 5281.64 -2494.56 5841.11 334.72 3.14 BP MWD+IFR+MS 162 9450.29 89.05 23.03 31.39 4441.24 4141.25 5310.38 -2481.95 5861.76 334.95 4.28 BP _ _MWD+IFR+MS 163 9481.31 90.60 23.63 31.02 4441.33 4172.22 5338.87 -2469.67 5882.41 335.18 5.36 BP _MWD+IFR+MS 164 9511.40 90.63 23.40 30.09 4441.01 4202.25 5366.46 -2457.66 5902.45 335.39 0.77 BP _MWD+IFR+MS 165 9543.35 90.71 23.93 31.95 4440.64 4234.13 5395.72 -2444.84 5923.77 335.62 1.68 BP MWD+IFR+MS 166 9574.26 91.33 22.75 30.91 4440.09 4264.98 5424.09 -2432.60 5944.60 335.84 4.31 BP _MWD+IFR+MS 167 9605.63 90.92 21.89 31.37 4439.47 4296.32 5453.11 -2420.69 5966.25 336.06 3.04 BP _MWD+IFR+MS 168 9636.84 90.78 19.24 31.21 4439.01 4327.52 5482.32 -2409.73 5988.54 336.27 8.50 BP MWD+IFR+MS 169 9668.31 91.07 19.80 31.47 4438.50 4358.99 5511.98 -2399.21 6011.50 336.48 2.00 BP _ MWD+IFR+MS 170 9699.22 91.77 20.49 30.91 4437.73 4389.89 5540.99 -2388.57 6033.89 336.68 3.18 BP _ MWD+IFR+MS 171 9730.59 92.62 20.97 31.37 4436.53 4421.23 5570.31 -2377.47 6056.46 336.89 3.11 BP _MWD+IFR+MS 172 9762.20 92.74 19.80 31.61 4435.05 4452.81 5599.90 -2366.48 6079.40 337.09 3.72 BP MWD+IFR+MS 173 9793.48 90.44 21.48 31.28 4434.19 4484.07 5629.16 -2355.45 6102.10 337.29 9.10 BP _ MWD+IFR+MS 174 9824.92 88.08 21.51 31.44 4434.59 4515.49 5658.41 -2343.94 6124.67 337.50 7.51 BP _ _MWD+IFR+MS 175 9856.20 88.86 19.60 31.28 4435.43 4546.76 5687.69 -2332.96 6147.56 337.70 6.59 BP MWD+IFR+MS 176 9886.92 89.04 20.83 30.72 4435.99 4577.47 5716.51 -2322.34 6170.23 337.89 4.05 BP _MWD+IFR+MS 177 9918.05 90.61 21.61 31.13 4436.09 4608.59 5745.53 -2311.08 6192.91 338.09 5.63 BP MWD+IFR+MS 178 9949.19 90.28 21.83 31.14 4435.84 4639.72 5774.46 -2299.55 6215.49 338.29 1.27 BP _ _MWD+IFR+MS 179 .9978.94 90.94 20.59 29.75 4435.53 4669.46 5802.19 -2288.79 6237.30 338.47 4.72 BP _MWD+IFR+MS 180 10008.96 91.05 19.99 30.02 4435.01 4699.48 5830.34 -2278.38 6259.70 338.66 2.03 BP MWD+IFR+MS w y SCHLUMBERGER Survey Report 29-Jan-2006 14:02:47 Page 8 of 8 Seq Measured # depth - (ft) 181 10039.41 182 10070.10 183 10101.06 184 10131.15 185 10160.75 186 10193.12 187 10225.35 188 10257.92 189 10289.13 190 10320.92 191 10353.18 192 10384.56 193 10416.10 194 10446.52 195 10478.46 196 10509.96 197 10540.41 198 10557.57 199 10605.00 Incl angle (deg) 91.54 89.58 86.87 86.87 86.35 86.09 86.19 86.57 89.14 89.29 89.03 90.16 90.75 90.69 91.08 90.00 88.35 88.39 88.39 Azimuth Course angle length (deg) (f t) 18.57 30.45 20.70 30.69 20.62 30.96 20.69 30.09 21.02 29.60 21.23 32.37 21.37 32.23 21.33 32.57 20.73 31.21 22.83 31.79 22.79 32.26 22.71 31.38 23.46 31.54 23.71 30.42 24.05 31.94 24.86 31.50 24.03 30.45 24.07 17.16 24.07 47.43 TVD depth (f t) 4434.32 4434.02 4434.98 4436.62 4438.37 4440.50 4442.67 4444.73 4445.90 4446.33 4446.81 4447.03 4446.78 4446.40 4445.90 4445.61 4446.04 4446.53 4447.87 Vertical Displ Displ Total section +N/S- +E/W- displ (ft) (ft) (ft) (f t) 4729.91 5859.07 -2268.33 6282.84 4760.60 5887.98 -2258.02 6306.10 4791.54 5916.93 -2247.10 6329.26 4821.58 5945.04 -2236.51 6351.81 4851.13 5972.65 -2225.99 6373.98 4883.42 6002.78 -2214.35 6398.18 4915.57 6032.74 -2202.67 6422.28 4948.06 6063.02 -2190.83 6446.70 4979.24 6092.13 -2179.64 6470.30 5011.01 6121.64 -2167.85 6494.16 5043.23 6151.38 -2155.34 6518.05 5074.57 6180.31 -2143.21 6541.38 5106.07 6209.33 -2130.84 6564.77 5136.43 6237.20 -2118.67 6587.22 5168.29 6266.41 -2105.74 6610.75 5199.69 6295.08 -2092.70 6633.81 5230.05 6322.79 -2080.10 6656.17 5247.16 6338.46 -2073.11 6668.87 5294.45 6381.75 -2053.78 6704.08 At DLS Srvy Tool Azim (deg/ tool Corr (deg) 100f) type (deg) ---- ----- ------ 338.84 4.93 BP_MWD+IFR+MS 339.02 9.43 BP_MWD+IFR+MS 339.20 8.76 BP_MWD+IFR+MS 339.38 0.23 BP_MWD+IFR+MS 339.56 2.08 BP MWD+IFR+MS 339.75 1.03 BP_MWD+IFR+MS 339.94 0.53 BP_MWD+IFR+MS 340.13 1.17 BP_MWD+IFR+MS 340.31 8.46 BP_MWD+IFR+MS 340.50 6.62 BP MWD+IFR+MS 340.69 0.82 BP_MWD+IFR+MS 340.87 3.61 BP_MWD+IFR+MS 341.06 3.03 BP_MWD+IFR+MS 341.24 0.85 BP_MWD+IFR+MS 341.43 1.62 BP MWD+IFR+MS 341.61 4.29 BP_MWD+IFR+MS 341..79 6.07 BP_MWD+IFR+MS 341.89 0.33 BP_MWD+IFR+MS 342.16 0.00 Projected to TD [(c)2006 IDEAL ID10 2C 01] • • • Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: A06CC -Librarian Well No V-203L2 Date Dispatched: 6-Mar-06 Installation/Rig Nabors 9ES Dispatched By: Mauricio Perdomo LWD Log DeiiveryV1.1,10-02-03 Data No Of Prints No of Floppies Surveys 2 1 a Received By: Please sign and return to: Drilling & Measurements LWD Division 2525 Gambell Street, Suite 400 Anchorage, Alaska 99501 nroselCa?slb.com Fax:907-561-8317 ~,~ s ~t~ ~ ~(.~ ~ r ~ ~ ~ ' FRANK H. MURKOWSKI (_ j ~, . ,GOVERNOR Dave Wesley Senior Drilling Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: PBU V-203L2 BP Exploration (Alaska), Inc. Permit No: 205-170 FAX (907) 27&7542 Surface Location: 4801' FSL, 1920' FEL, SEC. 11, T 11 N, R 11 E, UM Bottomhole Location: 636' FSL, 3988' FEL, SEC. 35, T12N, R11E, UM Dear Mr. Wesley: Enclosed is the approved application for permit to redrill the above development well. The permit is for a new well branch of existing well PBU V-203L2, Permit No. 205-170 API No. 50-029-23285-61. Production should continue to be reported as a function of the original API number stated above. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pa; DATED this~day of November, 2005 cc: Department of Fish 8v Game, Habitat Section w/ o encl. Department of Environmental Conservation w/o encl. ~,~ tTf~- ~ v 114 ~ ~ uc'' STATE OF ALASKA ALASh OIL AND GAS CONSERVATION ~~AMISSION PERMIT TO DRILL 20 AAC 25.005 1 a. Type of work ®Drill ^Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ®Development Oil ^ Multiple Zone- >' ^ Stratigraphic Test ^ Service ^ Development Gas ^ Single Zone 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU V-203L2 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 10511 TVD 4446 12. Field /Pool(s): Prudhoe Bay Field / Orion 4a. Location of Well (Governmental Section): Surtace: 4801' FSL 1920' FEL SEC 11 T11 N R11 E UM 7. Property Designation: if'jG ~1 ADL 028238 c2, ~.z Schrader Bluff b , , , . , , Top of Productive Horizon: 3213' FSL, 5038' FEL, SEC. 02, T11 N, R11 E, UM (OBb) 8. Land Use Permit: 13. Approximate Spud Date: November 23, 2005 Total Depth: 636' FSL, 3988' FEL, SEC. 35, T12N, R11 E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 9010' 4b. Location of Well (State Base Plane Coordinates): Surtace: x- 590381 y- 5970046 Zone- ASP4 10. KB Elevation Plan (Height above GL): 78.2 feet 15. Distance to Nearest Well Within Pool 1005' from V-211 16. Deviated Wells: Kickoff Depth: 6802 feet Maximum Hole Angle: 93 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 1970 Surtace: 1528 18. as~ng rogram: Size Specffications Setting Depth To Bottom uantity o ement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 6-3/4" 4-1/2" 12.6# L-80 IBT 3761' 6750' 4388' 10511' 4446' Uncemented Slotted Liner 19. PRESENT W ELL CONDITION SUMMARY (To be completed for Redrill AND Re-entry Operations). Total Depth MD (ft): 10530 Total Depth TVD (ft): 4501 Plugs (measured): None Effective Depth MD (ft): 10530 Effective Depth TVD (ft): 4501 Junk (measured): None Casin Len h Size Cement Volume MD TVD c r 110' 20"x34" 60 sx Arctic Set A rox. 110' 110' 3388` 10-314° 3 sx AS Lite, 441 sx Class 'G' 3388' 2681' 7328' 7-5/8" 25 sx Class 'G' 7328' 4526' Pr c i in 2845' 4-1/2" Uncemented Slotted Liner 7685' - 10530' 4544' - 4501' Liner OBd 3605' 4-1/2" Uncemented Slotted Liner 6920' - 10525' 4445' - 4561' Perforation Depth MD (ft): Slotted Liner Perforation Depth TVD (ft): Slotted Liner 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ® Property Plat ^ Diverter Sketch ®Drilling Program ^ Time vs Depth. Plot ^ Shallow Hazard Analysis ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Scott Kolstad, 564-5347 Printed Name ve Wesle Title Senior Drilling Engineer ran on eltier, 564-5912 _ Prepared ey NameMumber. Si nature Phone 564-5153 Date 47 d5 Terrie Hubble, 564-4628 Commission Use Only Permit To Drill Number: ZoS- API Number: 50- O Z - Z Z Q - 6 Permit Approval Date: ~ See cover letter for other requirements Conditions of Approval: Sampl Required ^ Yes ;~No Mud Log Required ^ Yes ~ No _Hy ge Sulfide Measures ^ Yes ~ No Directional Survey Required Yes ^ No Other: ~~c~~` ~J(%'~~ ~~.' _35 ~'C~ ~~ Lti . APPROVED BY x A roved "" ~. ~ ~ ?, r THE COMMISSION Date [! Form 10-401 Pie~iised /2 L"'~'~ ~ Iti~, ~,,= r'~ ~ ~ ,Submit~fn Duplicate > ~.. r • • Well Name: V-203, V-203L1, V-203L2, V-203L3, & V-203L4 Drill and Complete Plan Summary Type of Weil (producer or injector): Surface Location: X = 590,380.87 Y = 5,970,046.49 As Built Sec 11, T 11 N, R 11 E, 4801' FSL & 1920' FEL V-203 OBc Target Start: X = 587,130 Y = 5,973,420 Z = -4445 TVDSS Sec 2N, T 11 N, R11 E, 5127' FEL 2934' FSL V-203 OBc Target End: X = 588,230 Y = 5,976,415 Z = -4420 TVDSS Sec 35, T 12N, R11 E, 3988' FEL & 636' FSL V-203L1 OBd Target Start: X = 587,130 Y = 5,973,420 Z = -4445 TVDSS Sec 2N, T 11 N, R11 E, 5127' FEL & 2934' FSL V-203L1 OBd Target End: X = 588,230 Y = 5,976,415 Z =-4480 TVDSS Sec 35, T 12N, R11 E, 3988' FEL & 636' FSL V-203L2 OBb Target Start: X = 587,215 Y = 5,973,700 Z = -4340 TVDSS Sec 2N, T 11 N, R11 E, 5038' FEL & 3213' FSL V-203L2 OBb Target End: X = 588,230 Y = 5,976,415 Z = -4365 TVDSS Sec 35, T 12N, R11 E, 3988' FEL & 636' FSL V-203L3 OBa Target Start: X =587,135 Y = 5,973,430 Z = -4285 TVDSS Sec 2N, T 11 N, R11 E, 5122' FEL & 2944' FSL V-203L3 OBa Target End: X = 588,230 Y = 5,976, 415 Z = -4330 TVDSS Sec 35, T 12N, R11 E, 3988' FEL & 636' FSL V-203L4 OA Target Start: X = 587,070 Y = 5,972,655 Z = -4200 TVDSS Sec 2N, T 11 N, R11 E, 5197' FEL & 2169' FSL V-203L4 OA Target End: X = 588,230 Y = 5,976,415 Z = -4265 TVDSS Sec 35, T 12N, R11 E, 3988' FEL & 636' FSL AFE Number: ORD5M3559 Ri Nabors 9ES GL: 52.7 RT: 28.5 RTE: 81.2 Estimated Start Date: November 23, 2005 O ratin da s to com lete: 41 Well Information Distance to Nearest Property: 9010' from Top Na to PBU boundary Distance to Nearest Well in Pool: 1005' from V-211 i at top OBd Welt Type: Schrader O-sand Penta-lateral Producer Current Status: New well, conductor is set Conductor: 20"X34", 215.5 ppf, A53, ERW set at 110' KB N2S: 0 ppm from produced fluids (approximated to be around 10 ppm due to contaminated gas lift gas) BHT: 90 °F ~ 4526' TVD BHP: 8.3 - 8.6 EMW ppg in Schrader OBd sands Permit to Drill 10/27/05 Formation Markers: Commercial Est. Formation Hydrocarbon Est. Pore Est. Pore To s Uncertaint Bearin Press. Press. (PP9 Formation VDss feet Yes/No Psi EMW G1 -245 +/-50' No 110 8.7 SV6 -875 +/-50' No 394 8.7 SV5 -1530 +/-50' No 689 8.7 SV4 -1650 +/-50' Gas H drates 743 8.7 Base Permafrost -1700 +/-50' Gas H drates 765 8.7 SV3 -2030 +/-50' Gas H drates 914 8.7 SV2 -2200 +/-50' Gad H drates 990 8.7 SV1 -2500 +/-50' Gas H drates 1125 8.7 UG4 -2785 +/-50' Thin coal 1253 8.7 UG4A -2810 +/-50' Heavy Oil between -2815 and -2950' SS 1265 8.7 UG3 -3145 +/-50' Thin coals 1415 8.7 UG1 -3610 +/-50' Heavy Oil from -3895 to - 3700' ss 1625 8.7 Ma -3895 +/-50' No 1753 8.7 Mb1 -3940 +/-50' No 1773 8.7 Mb2 -4010 +/-50' 1805 8.7 Mc -4085 +/-50' 1838 8.7 Fault #1 -4115 +/- 150' MD - see fault section for details Na faulted out n/a Nb faulted out n/a Nc -4120 +/-50' Yes 1854 8.7 OA -4215 +/-50' Yes 1840-1880 8.4-8.6 OBa -4275 +/-50' Yes 1880-1920 8.4-8.6 OBb -4315 +/-50' Yes 1942 8.7 OBc -4375 +/-50' Yes 1969 8.7 OBd -4425 +/-50' Yes 1900 -1970 8.3 - 8.6 OBe not reached +/-50' Yes rv~ ~ t: an tormation tops are required from surface to TD for all new wells Mud Program: 13-1/2" Surface Hole Mud Pro rties: Spud -Freshwater Mud Interval Densi Funnel vis YP PH FL Initial 8.5 - 9.1 250-300 50-70 8.5-9.0 NC-8.0 Base Perm 9.0 - 9.5 200-250 30-45 8.5-9.0 8.0 Interval TD 9.6 max 200-250 30-40 8.5-9.0 5.0-7.0 9-718" Intermediate Hole Mud Pro erties: Freshwater Mud LSND Interval Densi YP PV API Filtrate MBT H Chlorides Surface shoe to interval TD 8.8 - 9.3 22-30 12-18 4-6 < 20 9.0-9.5 <600 6-3/4" Production Hole Mud Pro erties: LVT-200 MOBM Versa-Pro Interval Densi Stabili Oii:Water Ratio YP PV API Filtrate MBT All five Laterals 9.2 650-900 80:20 initial 15-19 <20 4-5.5 < 6 Permit to Drill 10/27/05 • • Survev and Loaaina Praaram: 13-1/2" Hole Section: Surface G ro ma be needed O en Hole: MWD / GR Cased hole: None 9-7/8" Intermediate Hole: Surve s will be IIFR corrected real time and multi-station O en hole: MWD / GR / Res / Azimuthal Den / Neu / PWD Cased Hole: None 6-3/4" Produciton Holes: Surve s will be IIFR corrected real time and multi-station O en hole: MWD / GR / Res / Azimuthal Den / Neu /AIM / PW D Cased Hole: N/A Casinct/Tubina Program Hole Size Csg / Tb O.D. WUFt Grade Conn Burst si Collapse si Length Top MD /TVD Bottom MD /TVD 48" 20" X 34" 215.5# A53 Weld GL 110'/110' 13-'/z" 10-3/a" 45.5# K-55 BTC 3,580 2,090 3388' GL 3388' / 2681' 9-%8" 7--5/8" 29.7# L-80 BTC-M 6,890 4,790 7328' GL 7328' ! 4526' 6-3/a" OBc 4-'/2"slotted 12.6# L-80 IBT NIA N/A 2845' 7685' / 4544' 10530' / 4501' 6-3/a" OBd 4-'/2" slotted 12.6# L-80 IBT N/A N/A 3605' 6920' / 4445' 10525' / 4561' 6-3/a" OBb 4-'/2" slotted 12.6# L-80 IBT N/A N/A 3761' 6750' / 4388' 10511' / 4446' 6-3/a" OBa 4-%i" slotted 12.6# L-80 IBT N/A N/A 3906' 6600' / 4353' 10506' /4411' 6-3/a" OA 4-'/2" slotted 12.6# L-80 IBT N/A N/A 4093' 6400' / 4240' 10493' / 4346' Tubin 4-'h" 12.6# L-80 IBT-M 8,430 7,500 6300' GL 6300' / 4195' Surface and Anti-Collision Issues Surface Shut-in Wells: V-108 will require surface shut-in and well house removal in order to move over well V-203. No other wells should require well house removal and surface shut-in. Close Approach Shut-in Wells: There are NO wells requiring subsurface isolation for this profile. V-108 will remain shut in until V-203 is drilled past 800'. Close A~nroach Well List: Well Name Ctr-Ctr Distance Reference MD Allowable Deviation Precautiona Comment V-108 10.75' 599.23 7.01 Use Travelin C tinder G ro Cement Calculations ' Casin Size: 10-3/a -in 45.5-Ib/ft K-55 BTC surface casin Basis: Lead: 250% excess over gauge hole in permafrost, 30% excess over gauge hole below permafrost Lead TOC: Surface Tail: 1,000' of open hole. with 30% excess, plus 80' shoe track Tail TOC: 2,388' MD 1,000' MD above shoe Total Cement Volume: S acer 75 bbls of Viscosified Spacer wei hted to 10.10 p (Mud Push Lead 508 bbls, 2855 cult, 643 sks 10.7 Ib/ al ASL G + adds - 4.44 cuft/sk Tail 92 bbls, 516 cult, 441 sks 15.8 Ib/ al Class G + adds -1.17 cuft/sk Temp BHST ~55° F. BHCT -60° F estimated by Schlumberaer In the event that cement is not circulated to surtace during the initial surtace casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Open TAM Port Collar and perform second cement job. Basis: 7-5/8" Lead TOC: 3 Permit to Drill 10/27/05 Tail: 2940' of open holy Tail TOC: 4388' MD 1 Total Cement Volume: WasF T with 30% excess, plus 492' MD above the Ma, i 20 bbls CW 100 ~r 50 bbls of Viscosified 150 bbls, 842 tuft, 7~ ~ RH~T ~ 9(1° F frnm S 80' shoe track 1000' MD below Surface 'r (Mudpush) Weighted to 10.3 ~ 15.8 Ib/aal G + Gasblok -1.16 c Centralizer Recommendations 10-'/a" Casing Centralizer Placement a) Run (25) 10-3/4" Bow-spring centralizers attached over the collar of each joint of casing from the casing shoe up to 2,388' MD (1,000' MD above the shoe). b) This centralizer program is subject to change pending actual hole conditions. 7-°/e" Casing Space Out a) Spaceout the 7 5/e° casing to place a full joint in the window area of the OBb, OBa and OA sands. These KOP's may be altered to enhance reservoir contact depending on the angle of intersection of each zone. b) Place 1 RA tag above each window exit. RA tags to be spaced out -40 - 80' above window depth except on the OBd lateral. The RA tag for the OBd lateral will need to be placed 1125' above the casing shoe. 4 Permit to Drill 10!27/05 Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. Due to test pressures not exceeding S,000psi it will not be necessary to have two sets of pipe rams installed at all times. BOP regular test frequency-will be 14 days. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Surface Hole A diverter will be nippled up and function tested prior to drilling surface hole Intermediate Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 10-3/4" Casing Test: • Integrity Test - 9-7/8" hole: • Kick Tolerance: Production Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 7-5/8" Casing Test: • Integrity Test -6-3/4" hole: • Kick Tolerance: • Planned completion fluid: 1970 psi -Schrader OBd (8.6 ppg C~3 4,425' TVDss) 1,528 psi -Based on a full column of gas C~ 0.10 psi/ft 3,500 psi/250 psi Rams 2,500 psi/250 psi Annular ' 3,500 psi LOT 20' from -10-3/4" shoe 130 bbls with an 12 ppg EMW LOT at Ma with 8.7 pore pressure 1970 psi -Base of Schrader OBd (8.6 ppg C~ 4,425' TVDss) 1,528 psi -Based on a full column of gas (~ 0.10 psi/ft 3,500 psi/250 psi Rams 2,500 psi/250 psi Annular 3,500 psi FIT to 11.5ppg EMW 20' from 7-5/8" shoe (FIT test for OBc lateral only) Infinite at OBc, OBd, OBb, OBa, and OA with an 11.5 ppg EMW FIT 9.2 ppg SF OBM in Laterals, 9.2 ppg Brine, 6.8 ppg diesel in mother bore Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. 5 Permit to Drill 10/27/05 i • Drilling Hazards and Continaencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Schrader in the target fault block is expected to be normal pressured at 8.3-8.6 ppg EMW. This pressure is estimated based on offset well pressures and material balance. II. Hydrates and Shallow gas A. Gas Hydrates are expected at V-pad from the SV5 thru the SV1 sands below the base of the permafrost. Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole. Recommended practices and precautions for drilling hydrates should be followed in the surface hole. Occasionally hydrates are encountered below the SV1. III. Lost Circulation/Breathing A. Lost circulation is not expected at fault #1. This fault has been penetrated by most wells drilled from V Pad. B. Breathing is not expected on this well. IV. Kick Tolerance/Integrity Testing A. The 10-3/4" casing will be cemented to surface. B. The 10-3/4" casing test pressure is 3500 psi. C. The Kick Tolerance for the surface casing is 130 bbls with 9.1 ppg mud, 12 ppg LOT, and an 8.7 ppg pore pressure. D. 9-7/8" Open hole Integrity Testing -LOT to a minimum of 12 ppg EMW 20' from the shoe. E. The 7-5/8" intermediate casing will be cemented with 15.8 Ib/gal tail cement to 1492' MD above the Ma sand C~3 4388' MD. F. The 7-5/8° casing test pressure is 3500 psi. G. The Kick Tolerance for the intermediate casing is infinite (at OBc, OBd, OBb, OBa, and OA) with 9.3 ppg mud, 11.5 ppg FIT, and an 8.3-8.7 ppg pore pressure. H. 6-3/4" Open hole Integrity Testing (at OBc, OBd, OBb, OBa, and OA) -FIT to a minimum of 11.5 ppg EMW 20' from the shoe. V. Hydrogen Sulfide V Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. No measurable H2S is being produced from the formation at this time. However 10 ppm is measured regularly at V pad as a result of the use of Ivishak gas lift gas. All V Pad gas lift wells will likely have H2S in this concentration. Note that all injection has been with produced water not seawater. H2S levels are expected to remain low until the waterflood matures. Recent H2S data from the pad is as follows: Adjacent producers at Surface: Adjacent producers at TD: V-101 10 ppm V-102 25 ppm V-108 20 ppm Vt. Faults A. One fault is expected to be crossed at V-203. No losses are expected to be associated with this fault. Details are listed below for reference: Fault Location MD TVDss Throw Direction Uncertainty Fault #1 - UG_Mc 6304' 4115' -100' South +I- 150' MD CONSULT THE V-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 6 Permit to Drill 10/27/05 ~ ~ V-203. V-203 L1. V-203 L2. V-203 L3 & V-203 L4 DRILL AND COMPLETE PROCEDURE SUMMARY Pre-Rict Work: 1. A 34" x 20" insulated conductor has already been set and surveyed. Weld an FMC landing ring. for the FMC Gen 5 Wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and production simops. Drilling Rig Operations: 1. MIRU Nabors 9ES. Nipple up diverter spool and riser. Function test diverter. PU 4" DP and stand back in derrick. 2. MU 13-'/z" drilling assembly with MWD/GR and directionally drill suyface hole to approximately 3388' MD. The actual surface hole TD will be +/-100' TVD below the top of the SV1 sand. 3. Run and cement the 10-3/a", 45.5#, L-80 BTC surface casing back to surface. ND drilling spool and riser and NU casing /tubing head. NU BOPE and test to 3,500 psi. 4. MU 9-%e' directional drilling assembly with MWD/GR/Res/Den/Neu/PW D and a Ghost reamer t1,000'and 12,000' from the bit. RIH to float collar. Test the 10-3/a" casing to 3,500 psi for 30 minutes. 5. Drill out shoe track. Circulate and condition mud. Displace well to new 8.8 LSND drilling fluid. Drill 20' of new formation below rathole and perform a LOT. Directionally drill ahead to TD (-120' MD below Top OBd) as per directional profile to 7328' MD. 6. Make short trip as needed, work tight spots as seen. Circulate and condition mud at TD. Make sure hole is clean prior to POOH. POOH for casing. 7. MU and run 7 5/8" 29.7# L-80 BTC-M long string casing to TD. Cement in one stage to 1492' MD (1000' from the surface casing shoe) above the Schrader Ma sand. Bump plug with seawater. 8. Clean pits for displacement. Freeze protect 7 5/8" x 10-3/a" annulus to 2,200' TVD. •:• V-203 OBc Lateral 9. PU 6-3/a" conventional assembly with MWD/GR/Res/Den /Neu/AIM/PWD and RIH to the float collar. Test the 7-5/8" casing to 3,500 psi for 30 minutes. 10. Displace well over to 9.2 ppg Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of new formation below rat hole and perform FIT to 11.5 ppg EMW. 11. Directionally drill ahead to TD geo-steering through the OBc to TD at 10530' MD. Back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 12. POOH to near OBb window depth, log into top OBb (RA marker) with GR, log across the OBa and OA windows as well. POOH. 13. MU and run 4-'/2" 12.6# L-80 BTC-M slotted liner with swell packer and Aluminum billet liner top. Position billet at 7,685'. POOH. • V-203L1, OBd Lateral 14. RIH with 6-3/a" sidetracking /drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to AI billet. Displace well over to 9.2 ppg Versapro MOBM. Time mill off billet to sidetrack. Directionally drill to the planned TD in the OBd. Back ream out of hole to shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 15. MU and run 4-%z" 12.6# L-80 BTC-M slotted liner with liner hanger and liner top packer. Position TOL for OBb whipstock. POOH. • V-203L2, OBb Lateral 16. PU the 7 5/8" whipstock assembly. Set the whipsock on the OBd liner top packer such that the top of the window is near the top of the OBb sand. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.2 ppg Versapro MOBM. Mill window. POOH. 17. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TD of OBb lateral. Back ream of of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 18. Pull whipstock #1. Run and set 4-Y2" slotted liner and hook hanger. POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #1 with ZXP liner top packer, POOH. • V-203L3, OBa Lateral 7 ~ Permit to Drill 10/27/05 19. PU the 7-5/e" whipstock assembly. Set the whipsock on the OBb liner top packer such that the top of the window is near the top of the OBa sand. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.2 ppg Versapro MOBM. Mill window. POOH. 20. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TD of the OBa lateral. Back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 21. Pull whipstock #2. Run and^set 4-'/z" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #2 with ZXP liner top packer, POOH. • V-203L4, OA Lateral 22. PU the 7 5/e" whipstock assembly. Set the whipsock on the OBa liner top packer such that the top of the window is near the top of the OA sand. Orient and set whipstock. Shear off of Whipstock. Displace well over to 9.2 ppg Versapro MOBM. Mill window. POOH. 23. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TD of the OA lateral. Back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 24. Pull whipstock #3. Run 4-~h" slotted liner and hook hanger, POOH'and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #3 with ZXP liner top packer. Clean pits for displacement. Displace mother bore over to 9.2 ppg KCL brine. POOH. 25. MU 4-'/z' 12.6# IBT-M, L-80 completion assembly and RIH. See completion schematic for details. Land tubing hanger and run in lockdown screws. 26. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK valve. 27. Install two-way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 28. Putl two-way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze protect the well to 2,200' TVD. Install VR plug in 7-5/8' casing annulus valves. 29. Install BPV. Secure the well and rig down /move off Nabors 9ES. Post-Rig Work: 1. MIRU slickline. Pull the ball and rod /RHC plug. 2. Pull out DCK shear valve, install GLV in all of the other mandrels as per the PE. 8 Permit to Drill 10/27/05 ~ ~ Variance Request Issue Compliance with AOGCC testing requirements for BOP rams after they have been used in the normal coarse of operations. Re uest The AOGCC is in the process of developing a guideline document clarifing the intent of the regulations pertaining to function pressure testing ram type BOP's. BPXA requests a variance to the provisions of 20 AAC 25.035 (e)(10)C regarding the function pressure test requirement after the use of BOP ram type equipment for other than well control or equivalent purposes, exce t when the routine use of BOP ram type equipment may have compromised their effectiveness. (Example would be when pipe rams are inadvertently closed on a tool joint during routine operations.) The activities associated with this request will not compromise the integrity of the BOP equipment. Background AOGCC regulations require rams that have been used in the course of primary drilling & completion, workover and through tubing drilling operations be function pressure tested before the next wellbore entry. This is not a new regulation. The intent of this regulation is to ensure that ram type equipment has integrity after it has been utilized in a wellbore...for example; to ensure integrity if a ram was closed on a tool joint. The exact regulation language is: "if BOP sealing ram type equipment has been used, it must be function pressure-tested, before the next wellbore entry, to the required working pressure specified in the approved Permit to Drill, using anon-compressible fluid, except that an annular type preventer need not be tested to more than 50 percent of its rated working pressure;" The pertinent sections are: 20 AAC 25.035 (e)(10)C PRIMARY DRILLING AND COMPLETION; 20 AAC 25.036 (d)(4) THROUGH TUBING DRILLING AND COMPLETION; 20 AAC 25.285 (f)(2) TUBING WORKOVERS: 20 AAC 25.286(e)(1) WORKSTRING SERVICE OPERATIONS This issue has been discussed with Winton Aubert at the AOGCC. The test requirement in the regulation is intended to apaly to ram type equipment only. The AOGCC understands that ram type BOP's are utilized for purposes other than well control in the normal coarse of operations. The regulations allowing a variance are at 20 AAC 25.035(h) PRIMARY DRILLING AND COMPLETION; 20 AAC 25.036(f) THROUGH TUBING DRILLING AND COMPLETION; 20 AAC 25.285(h) TUBING WORKOVERS; 20 AAC 25.286(g) WORKSTRING SERVICE OPERATIONS...which says generally: 20 AAC 25.035(h)... Upon request of the operator, the commission will, in its discretion, approve a variance (1) from the ROPE requirements in (e) of this section if the variance provides at least an equally effective means of well control; ~ . ~~ ~:~ ~ ~ ------ ----- --------- e s.nz I , :. , L-PAD 34. 35 ,~; I ~ M ~• I GRID I ~'12N° I 15"00'00'~ I T11N " I I Z - I PLANT I I K ~s~uK ,~. I I I I t~_: o~ 2 ~ 1 ~ ~ ~ 3 PROJECT `,' I ^ v-118 ^ v-11 s I AREA ( ^ V-03 ^ V-2131 I I ^ V-110 ^ V-100 I I ^ V-111 I ^ V-117 : V-PAD .. I ^ V-103 I `,,. "10 I ^ SLOT S-R I -_ . ,~~. ,11 12 I ^ V-106 I 't'F I I ^ SLOT N-M ~ VICINITY MAP I I I ,°~ ^ V-102 ^ V-SPARE (SLOT S-L) I N.T.S. / ^ V-201 I I ~ ^ V-107 ^ SLOT S-J I= ^ v-o2 0 l LEGEN D I V-104i ^ V-204 ado I I V-2101 ^ V-114 ~ I -~- AS-BUILT CONDUCTOR V-202 ^ V-119 ZI I V-SPARE (SLOT N{) ^ V-109 ^ EXISTING CONDUCTOR I I v-101 I V-211i ^ V-113 I I V-108 I I V-203 I I I I , OF A I I I '`P ~~ o , `°~'s~r ~^ ay ~ ' ~ >~e`49~ o>~ I , I V-PAD _ e o ooaoooaoaoooaaoooooooooaoooaoeo I TO 5p1NE ROAD ~~ " o0oooooevaeveeoooeevoeooooevooo _ _ - - - - - - '~,`o Richard F. Allison , O~P~PAD __ --- i - ~ ` 10608 0, ~ ~ t ~' ~ ,--,_ ge~,,~oo , NOTES 1. DATE OF SURVEY: JULY 17 & 18, 2004. SURVEYOR'S CERTIFICATE 2. REFERENCE FIELD BOOK: W004-11 PGs. 19-2s. 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, I HEREBY CERTIFY THAT I AM NAD 27. GEODETIC POSITIONS ARE NAD-27. PROPERLY REGISTERED AND LICENSED 4. BASIS OF HORIZONTAL CONTROL IS V-PAD TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA ANO THAT OPERATOR MONUMENTATION. THIS PLAT REPRESENTS A SURVEY 5. BASIS OF ELEVATION IS KUPARUK PIPELINE CONTROL. MADE BY ME OR UNDER MY DIRECT ELEVATIONS ARE BP MEAN SEA LEVEL DATUM. SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE 6. THE MEAN SCALE FACTOR FOR V-PAD IS 0.999909334. CORRECT AS OF JULY 18, 2004. LOCATED WITHIN PROTRACTED SEC. 11, T. 11 N., R. 11 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION N0. COORDINATES COORDINATES POSITION DMS POSITION D.DD BOX ELEV. OFFSETS V-203 Y=5,970,046.49 N=10,180.05 70'19'40.471" 70.32799086' 52 7' 4,801' FSL ' X= 590,380.87 E= 4,629.84 149'16'01.221" 149.2670058' ' 1,920 FEL V-210i Y=5,970,069.62 N=10,179.79 70'19'40.688" ' " 70.3279689' S2 6' 4,823' FSL ' X= 590,468.21 E= 4,720.20 149'15 58.663 149.2662953' 1,833 FEL V-211 i Y=5,970,054.32 N=10,180.08 70'19'40.544" ' 70.3279289' S2 4' 4,809' FSL ' X= 590,410.00 E= 4,660.00 149'16 00.368" 149.2667689' 1,891 FEL V-SPARE Y= 5,970,061.76 N=10,179.73 70'19'40.614" 70.3279483' 1' 53 4 816' FSL ' SLOT N-E X= 590,439.13 E= 4,690.07 149'15'59.515" 149.2665319' . 1,862 FEL P . 1LOOeCL _......... NAq(LEMAN C"ECICED: oNgL by O O DATE: 7 22/04 Reo4 ~wov oz-oo GREATER PRUDHOE BAY V-PAD s~ET: I~UQD 108 N° AS-BUILT WELL CONDUCTORS 00~ „011,,,, ~,,,~,"„ SCALE: V-203, V-2101, V-211 i t of 1 ° ~wm i0R 1~`0"°ATON """' "1O .a m ~ ~ i'=tso' and V-SPARE (SLOT N-E) WF].L IM:-iALL.X ANTI-COLLISION SE'TfINGS (~(IMI'ANY IH:I AI11 til1RV1:Y PN(xiRAM Nye +N/J ~E'•W NunWgl 4iang IMNWe L.maimJe 81x1 HP Alwwv Imerpolation Methodi7lD Interval: 25.00 hiNh rm I7vINh To XuvayTWa Taol PMV•2m QO-A) 86.71 -1x8.A 397gN6A9 JW78UA7 70°197U./71N 14Y°Ib'UI121W WA Depth Range From: 28.50 T0: 10530.14 ('ak11ls(um McAXI: MWinN®('umaurc 28.41 IgM1.W PWmad V-203 wpU6 V22 tiYU-(;l'~S Maximum Range: 1250.16 Rekrence: Plan: V-203 xy04 Hm»+yuXn: l~cwsn IIXNI.W losw.lJ rl.mu~ v-zoJ wpllJ VZ2 MwH.aR+Ms Naon Md8a1: 1'nv ('ylioJsr N.vW _ I~mrxmr .. I;niab„1.c.Niae W;uning MellaXl: RUkn LWaaJ O lan V-203 L4) wtJ 1.PATN UhTA1L8 - _ --- From Colour To MD Pho°am - - --- 5 i __ _ ~ 'A 500 1000 R`I: un~: ia''s:si i %uoe 33 ~, - -_ ~n~~, ~-?03~3~ (ooo (Soo Y,w<iw (>,~ (Iliyh %~ Ague .ws ~-w P111m~vu ,_ y - - ~ 1500 2000 i42.n3^ n.w o.W 2N.<o c _ ~ 2000 2500 3 -, - _ _ - ~ ~~ \~ ~ 2soo 3000 F - `~. ~ L~ 3000 3500 ~ ~~~ _ ~ add 3500 4000 ~~ _ - - <~~~ \`~ ~ 4000 4500 ~ ~ - - ~ ')` LEGEND V~ \VA 4500 5000 O - ~ ~ X ~\\ ~~ L-03 (I.-(13f, MaJar Ruk a i ~ ''~~~~~~~ ~ 5000 5500 --- L-IUIIL-Iw>,M. R~ ~, _ __ _ / ~ ~ \ SS~ ~~ ~ PWn L-2171~(1)ll'In L-21J).M~Wak ~- _ /'~ ~ ~ \~~X~ .\ ~~ PWn V-112 (SAI (PIm V-1124 M~pr WXk ~ -1- '_ ~ ~ \ ~, \ ~ 6000 7000 Phn V 112 (8711 ~ not ure (PWo V-112F Mgar Rld; Phn V-11318-RI Ja oot uar (PWo V.112PH1), Mayor Ruk 30 /~ - ~ ~~ ~ ~ \~~~~ x\~\\\ O ~~~ g~~ ~~ PWo V-2071X-AI(PIro V-203 CwNIn81V112 Ta1~t1A N(>k'7tR0 8 i~ ~ . \~~~ \~ \ g~0 X000 PWn V 203 M-A) (Pho V-203 LIB NDFJHtORx \ ~ \ \ \\\~~k, \~, ` ~ I'Wo V-203 IN-Al(PWo V-203 L2t NOFRit()Ite _ _ XX" \\ \ 900 1 (Q0~ ~" PWo V-2U3 IN-Al (Phn V-303 Lil, NOFRROR3 ~ ~ ~~~~~ ~ ~\ ~ PWo V-303 (N-Al (PWn V-207 LIA NOPRR(SRS ' ~ Ay\ ~ v A ~ 11000 -- 12000 ~. Prl v.zla t<+-rxr~ v.zul. Majn Rick / _ - ~~~ ~ ~~~'~~ ~ ~\ ~ 2000 13000 - vu3r-0x>,Map..RWk ~ ~ ~~ \\ ~~ V•l01 (V-IUIF Map Rfd: _ _ v ~ ~~~,t ~ VA 000 14000 - v-lo2(v-loz>,Iax.R~ ~ _ ~~ V 0 15000 ~. v-lutly-IUSxM.>,.wrk ~ ` ~~ ~ V-107 N-1078 xWpr Rnk ~• V-IOR (V-IlBtl, Minor l/2W \ ~`\~ ~~ V-IWIV IW6 FWja Kirk ~~ - ~ V-109 (V-I09PNI). BWja Ride / `\'. \ ~~ V-IW IV•IO9PH2A Major Rut ~ ~~ V-IIi1V-117A 8Wju Rick ~\~~ 1'\ ~• V-I IJ IV-I IJA 81ayx RWk `I\ ~ ~. V-I Ii IV.I I4AF Major Ride ~~ V-I li (V-I IJAPBIN Majur Rid; 13 ~ ~ -_, - - ~ ~~~~ ~ 1~~~ ~ V-1N(V-1IIAI'B2), BWju Risk / / ~ ~ V-119 (V•119A Major RWlc i ~ I V-2011V-ZUTA MaprRWc / ` ~ I ~ ~ V-1U3 (V 2021. M p Rwk ' ~I ~ ~ ~I ~II I ~ V•zU2 (V-3U11.IA Mapr RWk 11 I I i t I I I I I ~ ~I , ~ V•203 (V-30211), MaJur Rixk 0 270 ~ ~~ ~~'. ~ ~ ~ ~'1 ~ vao6lvm6XM.~,rwa< i ~ ~ 1 ~ ~~ 1 I I I I ~ I ~ ~ ~ ~ ~ - v.2o4n'-zaLIJ ,~RWk \ k ~~_~ I I l i p ~~ V-3MIV-2U4LIPHIAM jar Rio I / ~ I I I -i /C - v.xoa (v. w. Major ai6k ~ ~ l~ I~ I f l~ l ~~ I I~~~ ~ ~ ~ i i ~~ I ry vsa iauv0lx M.;u<w~ ~l/ l / III Y I ~~ V3UJ fV-2WL3A Mier RWlc ll/ (~/ III I ~ I l ri l r'4~ _~ ~ ~ V.2W htaJw Rid: 13 G :\ ~-` -" / ~~ /f 11 '~i llll( %'~//l%(~ I%~~~ ~ ~~ = v:i"oiv:ioei%i~wrx n' ~ /~/~ ~/i ~ , /~!llr/ `/f/l~//11 /1 l/l~f ~ I/ ~ - v:iiirv:i'u:M:R~k '\~ ~ I'Wn V-2111 W //~ /~ '/x,//,~, / ~/ / / / / / / ~/ / , ry7 ~ ~ V.2U111 / / i, ~~ ~~ _ - i; ij. '~ ji~ 38 N ~ ' -- '~ ~. , 240 \~ ' :` _ ~ ~ ' ~~i 120 c ~~~~~~ ~_ ~',- 0 ~~ .. *ii ~ ~ - , ~ ~~ Y~I-_„-._ ~' - NIK"Il<1N IIli'I A111 ~, '~ __ ~\ ~ _ /' &c MII Un' A'd lYD ~W-S •1/-W Dl.eµ 'I'Face \Bec lar8a \ - -- _.~' ". _ ... / ~ 1 3x711 II IXI U.IXI 2X.41 OINI U.ql U.W 11.1X1 U.W 2 31NI.W 11.1X1 11.1X1 31X1.IX1 UINI U.INI (I.W I11N1 O.ql 3 ~\ ~ ; - _ F " _ 1 43133 21X1 412.1X1 J3i.31 127 .1.97 I <11 3o2.W 1.78 ~._' i _ - J N113i 111,1X1 711'.1X1 X41 ]9 27.77 -1)711 +(NI U.ql 1777 = ~ < I<66.67 72 q1 it2.la 11112 1617% -1sX YI 3.1X1 OW 2337) _ b IYW.W 17 q1 i112.W 17%_.µJ 261 RU JI8.Y7 ICU II.W 77x111 7 2114294 171X1 7(12 W 191X/ W w7.i9 FYI 91 OIIU U W 44117 _ , 21 ~ _ __ ~ CO % 3JN11.%N cµ 1 302.68 22 YJ3 c19 J9 -It261U 4.q1 L57 779 U7 - J _ - - 9 c321.71 SN.51 7112.6X 3fi91.I2 17%132 -2797« U.ql U.W 2t6.J5 ~~ _- _ - ' III 6<17211 67W 117.1X1 7291.211 2668.44 -3$79.10 4.W 96 s; 7s91.1U V-3017'op OA 5 __ ..~ -.~ - -' - II 6ssfi 27 6t 74 33N.<U Jw7.J7 26Ni.gl -32MU.W1 4.q1 6181 1<bt1J _ - ''= ~" I2 671X36 6517 icX,tll 47fi%.JI 2X I9.UX •.4'X7A3 U.W U.W J6Y6.Y3 ~'- - "---"'-' "' -'J 13 732X11 X1.W Is,W t2fi.2o 7412.74 -311019 4.W 72.11 4276.7< V-203 TI Id 7437.Ip µ7AY Ix.3N J<3.1.11 1516.63 •317x96 J.W 3<26 7325.W 0 1 p 15 Ifi 761W.99 87.4Y 74111 tY IIXI IRI IN.<N 1 4 1 Jc.ly.2U 4t2Y RY 3751.ON 3YM 7A -31W.W 70 -485 U.W 9 W O.W OY 61 4524.9} V-203 TS 7679 71 0 17 . )Y%II.iN IINI.IX1 . , 3.1.53 . J<I6.111 . JIXN.<3 . •2962.7Y . U.ql . U.ql . 17$P.gS - A,, T lrig ylllld E11Z1I11 > [ l VS L7 ^w '-"( 3:~" i"' ': "°'" ~ f ~ "''6a~ (~ •.. }~y .~7~. p,/ C tI'e 6}I ~~llµe S .~•C~•C~t1Qn - jt/]~]]l IN I') NI 21 21 3 lNNi,<6 911.110 X2711,12 WINI %%. 7.(11 qI.W W179.119 W.W XNY7.45 'A1.71 911 73 11.1X1 1%.%1 IA.RI IY.69 19.6Y IY b J51N.NI 4416211 d1W 2U 7111620 Js1161KK i 011X.13 427613 4%30 19 1X4101 7XSX.NI s t -2911191 :x19.17 -2X026 -2632.99 •1626 %U 0 7 9.Ip 9.W O.W O,W 4.W -17117 -W.W 0 W W.W O.W 479926 V-203'17 7905 <t <3996s 41712 V-303 T5 4317s T#$ [ XL 2 2J 25 Mty,3X . 467771 qI.W 4fiUt 32 X4 66 . Y 19.69 14 87 i6Yfi 2 4196.X1 ii9fi 17 t .61 7 s5Y2W S WI 41 U -231 •2761 PY ig1 65 2 U.W d.W ql O O.W -1X.81 171 91 bOl4At lA19JP V-20316 6056 Y .... r .: ~- .. - ~ ~ . 2fi 1051(1.17 X4.66 . IY.N7 7501.211 6354.4 . - . -2077.19 . O.ql . U.W . 6 6712.13 V-1031'7 V-203, L1, L2, L3, & L4 PROPOSED COMPLETION TREE: FMC 4-1/16" 5M WELLHEAD: FMC Gen 5 System 20" X 34" 215.5 Ih/ft, A53 ERW Insulate d @ 109` 11", SM csg.head w/ 7" mandrel hanger & packoif 11" x 11", 5M, tbg spool w! Halliburton X-Nipple (3.813" ID) @ 2200' TVD 11" x 4-1/2" tubing hangar with control line ports 11" X 4-1/16" Adaptor Flange 4-1/2", 12.6 Ib/ft, L-80, BTC-M Orig KB elev (N-9ES) _' Coupling OD: 5.2" Drift/ID : 3.833"/3.958" 10-314", 45.5# L-80 BTC Csg @ 3,388' MD ~ " " 4.5 Baker sliding sleeve with 3.813 ID @ GLM Design: 7-5/8" X 5-1/2" Baker PRM Packer @ #4 -TBD' TVD - 4-1/2" X 1" KBG-2 - SV #3 -TBD' TVD - 4-1/2" X 1" KBG-2 - DV Halliburton X-Nipples (3.813" ID) #2 - 4 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV 4.5" WLEG @ 6,764' MD #1 - 2 jts above sliding sleeve - 4-1/2" X 1"KBG-2 - DV Phoenix Pressure Gauge Versapro SFMOl3M in each Lateral a with control N'^~` nd in mother bore from lbg tail down. lines to surface 6-3l4" OA Lateral 6,400'-10,493' / RA Tag TBD _ - - e a _'_ _ _-®--~°_- - - - `~,~. ':w Swell packer placement TBD Junction Specifications: / 6-314" OBa Lateral (6,6Q0' 10 506' ~ Junction ID through LEM Module without diverter. 3.68" RA Tag TBD =~ ,..? ~ " LEM run with internal sealbores "".::: ®~ .•• •~_• - M'' ~ -" to allow the use of isolation ' sleeve across window. ! I Swell packer placement TBD --------------------'---._............ /, Baker Hughes Hookwall Hanger RA Tag TBD Window in 7-5/8" casing Well Inclination @ Window = ° c-s!n" OBb Lateral 6,750'-10,511' Baker Hughes Hookwall Hanger Solid Liner 7 685'- 10 530' Wndow in 7-5/8" casing , , \ Well Inclination @ W indow = °_ _c _ °_ ,~'~ m_ _ J , Baker Hughes Hookwall Hanger - ~~ 4 Window in 7-5/8" casing Swell packer placement TBD OBc Lateral Aluminum ° Well Inclination @ Window ~ RA T TBD '~ Billet ~ "° _ ° ag . _ ° -- _ - - 0 4s ,t` ~ -518", 29.7#, L-80, BTC-M @ 7328'. Casing Drift: 6.75" Casing ID: 8.875" UATfe nEV. BY COMMEIJTS ,r p ~r (' J~nn ~ ` " C ~ 1011U2005 SRK Lwsl 3 Mukl•Lstaral, 4-112" GL ComplsHon ~7 / ~ f .' tl~ ~r~I J 1.r° ~^"° / API NO: 50-029- so-029- ORION 50-029- WELL: V-203 ML 50-029- 6-3/4" OBd Lateral 6,920'- 10,525' • C, S err -Sun P Y BP Planning Report Company:. - BP Amoco Date: 9/12/2005 Time: 14:33:25 Page: 1 Field: Pnxihoe Bay Co-ordinate(NE) Reference: W eIL• Plan V-203 (N-A), True North Site: PB V Pad Vertical (TVD) Reference:. 28.5+52.7 81.2 Well: Plan V-203 (N-A) Section (VS) Reference: W eli (O.QON,O.OOE,342.03Azi) Wellpath: Plan V-203 L2 Survey Caleulatioo Method: Minimum Curvature Db: Orade Plan: V-203 L2 wp04 Date Composed: 8/25/2005 Q~~ %cL>~~~1 ~ Version: 21 Principal: Yes Tied-to: From: Definitive Path Field: Prudhoe Bay North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Site: PB V Pad TR-12-12 UNITED STATES :North Slope Site Position: Northing: 5969964.50 ft Latitude: 70 19 39.618 N From: Map Easting: 590770.65 ft Longitude: 149 15 49.871 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.69 deg Well: Plan V-203 (N-A) Slot Name: As-Built ASP 08-23-05 Well Position: +N/-S 86.71 ft Northing: 5970046.49 ft Latitude: 70 19 40.471 N +E/-W -388.79 ft Easting : 590380.87 ft Longitude: 149 16 1.221 W Position Uncertainty: 0.00 ft Casing Points MD TVD Diameter Hole Size. Name ft ft in in 10511.00 4446.20 4.500 6.750 4 1 /2" Formations MD TVD Formations Lithology Dip Angk', Dip Direction ft ft deg deg 0.00 Nc 0.00 0.00 0.00 OA 0.00 0.00 0.00 OBa 0.00 0.00 0.00 OBb 0.00 0.00 8495.64 4451.20 OBc 0.00 0.00 0.00 OBd 0.00 0.00 Targets Map Map <--- Latitude -> ` <--- Longitude ->. Name Description TVD +N!-S +E!-W Northing : Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft V-203 L2 T1 4421.20 3691.72 -3121.91 5973700.00 587215.00 70 20 16.772 N 149 17 32.403 W V-203 L2 T2 4436.20 3881.00 -3059.62 5973890.00 587275.00 70 20 18.634 N 149 17 30.586 W V-203 L2 T5 4441.20 5572.96 -2369.13 5975590.00 587945.00 70 20 35.276 N 149 17 10.434 W V-203 L2 T3 4446.20 4199.50 -2930.76 5974210.00 587400.00 70 20 21.767 N 149 17 26.826 W V-203 L2 T6 4446.20 6394.54 -2074.19 5976415.00 588230.00 70 20 43.357 N 149 17 1.824 W V-203 L2 T4 4456.20 4875.89 -2622.57 5974890.00 587700.00 70 20 28.420 N 149 17 17.831 W Plan Section Information MD Incl Azim TVD +N/-S +EI-W DLS Build Turn TFQ Target ft deg' deg ft ft ft ` deg/100ft deg/1OOft deg/100ft deg; 6802.10 68.66 1.31 4406.21 2908.98 -3284.55 0.00 0.00 0.00 0.00 6822.10 70.80 2.46 4413.13 2927.73 -3283.93 12.00 10.71 5.77 27.00 7069.41 92.94 13.68 4448.00 3168.13 -3249.16 10.00 8.95 4.54 27.67 7575.40 92.94 13.68 4422.06 3659.12 -3129.64 0.00 0.00 0.00 0.00 S err -Sun P Y BP Planning Report 'Company: BP Amoco Date: 9/12/2005 Time: 14;33:25 Page: 2 Field: Prudhoe Bay Go-ordinate(NE) Reference: ' Well: Plan V-203 {N-A), True North Site: PB V Pad Vertical (TVD) Reference: 28.5+52.7 81.2 Well: Plan V-203 (N-A) Section (VS)'Reference: Well`(O.OON,O.OOE,342.03Azi) Wellpath: `Plan V-203 L2 Survey Calculation Method:. Minimum Curvature I)b: Oracle Plan Section Information MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg 7608.92 90.00 13.00 4421.20 3691.72 -3121.91 9.00 -8.77 -2.03 -166.93 V-203 L2 T1 7709.02 84.35 20.03 4426.14 3787.47 -3093.54 9.00 -5.64 7.02 128.95 7790.18 84.35 20.03 4434.13 3863.36 -3065.87 0.00 0.00 0.00 0.00 7809.01 83.00 19.00 4436.20 3881.00 -3059.62 9.00 -7.18 -5.47 -142.93 V-203 L2 T2 7885.66 89.00 22.41 4441.54 3952.48 -3032.60 9.00 7.83 4.45 29.69 8142.61 89.00 22.41 4446.02 4189.98 -2934.65 0.00 0.00 0.00 0.00 8152.89 89.00 22.00 4446.20 4199.50 -2930.76 4.00 -0.02 -4.00 -90.26 V-203 L2 T3 8225.49 89.18 24.90 4447.35 4266.09 -2901.88 4.00 0.25 3.99 86.40 8796.77 89.18 24.90 4455.49 4784.22 -2661.39 0.00 0.00 0.00 0.00 8896.35 90.00 21.00 4456.20 4875.89 -2622.57 4.00 0.82 -3.92 -78.19 V-203 L2 T4 8936.51 91.22 19.95 4455.77 4913.51 -2608.52 4.00 3.03 -2.61 -40.77 9607.78 91.22 19.95 4441.52 5544.35 -2379.53 0.00 0.00 0.00 0.00 9638.21 90.00 20.00 4441.20 5572.96 -2369.13 4.00 -4.00 0.16 177.69 V-203 L2 T5 9648.62 89.67 19.75 4441.23 5582.74 -2365.59 4.00 -3.17 -2.44 -142.47 10511.15 89.67 19.75 4446.20 6394.54 -2074.19 0.00 0.00 0.00 0.00 V-203 L2 T6 Survey MD Incl Azim TVD Sys TVD N/S E/W DLS MapN MapE TooUComme t ft deg deg ft ft ft ft deg/100ft ft ft 6802.10 68.66 1.31 4406.21 4325.01 2908.98 -3284.55 0.00 5972915.43 587061.81 MWD+IFR+MS 6822.10 70.80 2.46 4413.13 4331.93 2927.73 -3283.93 12.00 5972934.18 587062.21 MWD+IFR+MS 6900.00 77.74 6.16 4434.25 4353.05 3002.43 -3278.26 10.00 5973008.94 587066.98 MWD+IFR+MS 7000.00 86.70 10.63 4447.78 4366.58 3100.32 -3263.77 10.00 5973106.99 587080.28 MWD+IFR+MS 7069.41 92.94 13.68 4448.00 4366.80 3168.13 -3249.16 10.00 5973174.97 587094.07 MWD+IFR+MS 7100.00 92.94 13.68 4446.43 4365.23 3197.81 -3241.94 0.00 5973204.73 587100.94 MWD+IFR+MS 7200.00 92.94 13.68 4441.30 4360.10 3294.85 -3218.32 0.00 5973302.03 587123.39 MWD+IFR+MS 7300.00 92.94 13.68 4436.18 4354.98 3391.88 -3194.70 0.00 5973399.34 587145.84 MWD+IFR+MS 7400.00 92.94 13.68 4431.05 4349.85 3488.92 -3171.08 0.00 5973496.64 587168.29 MWD+IFR+MS 7500.00 92.94 13.68 4425.92 4344.72 3585.95 -3147.45 0.00 5973593.94 587190.74 MWD+IFR+MS 7575.40 92.94 13.68 4422.06 4340.86 3659.12 -3129.64 0.00 5973667.32 587207.66 MWD+IFR+MS 7600.00 90.78 13.18 4421.26 4340.06 3683.03 -3123.93 9.00 5973691.29 587213.08 MWD+IFR+MS 7608.92 90.00 13.00 4421.20 4340.00 3691.72 -3121.91 9.00 5973700.00 587215.00 V-203 L2 T1 7700.00 84.86 19.39 4425.29 4344.09 3779.02 -3096.56 9.00 5973787.60 587239.29 MWD+IFR+MS 7709.02 84.35 20.03 4426.14 4344.94 3787.47 -3093.54 9.00 5973796.08 587242.22 MWD+IFR+MS 7790.18 84.35 20.03 4434.13 4352.93 3863.36 -3065.87 0.00 5973872.29 587268.96 MWD+IFR+MS 7800.00 83.65 19.49 4435.15 4353.95 3872.55 -3062.57 9.00 5973881.52 587272.15 MWD+IFR+MS 7809.01 83.00 19.00 4436.20 4355.00 3881.00 -3059.62 9.00 5973890.00 587275.00 V-203 L2 T2 7885.66 89.00 22.41 4441.54 4360.34 3952.48 -3032.60 9.00 5973961.79 587301.16 MWD+IFR+MS 7900.00 89.00 22.41 4441.79 4360.59 3965.73 -3027.13 0.00 5973975.11 587306.47 MWD+IFR+MS 8000.00 89.00 22.41 4443.54 4362.34 4058.16 -2989.01 0.00 5974067.99 587343.47 MWD+IFR+MS 8100.00 89.00 22.41 4445.28 4364.08 4150.60 -2950.89 0.00 5974160.86 587380.46 MWD+IFR+MS 8142.61 89.00 22.41 4446.02 4364.82 4189.98 -2934.65 0.00 5974200.44 587396.23 MWD+IFR+MS 8152.89 89.00 22.00 4446.20 4365.00 4199.50 -2930.76 4.00 5974210.00 587400.00 V-203 L2 T3 8200.00 89.12 23.88 4446.97 4365.77 4242.87 -2912.41 4.00 5974253.59 587417.83 MWD+IFR+MS 8225.49 89.18 24.90 4447.35 4366.15 4266.09 -2901.88 4.00 5974276.93 587428.08 MWD+IFR+MS 8300.00 89.18 24.90 4448.41 4367.21 4333.66 -2870.51 0.00 5974344.87 587458.62 MWD+fFR+MS 8400.00 89.18 24.90 4449.84 4368.64 4424.36 -2828.42 0.00 5974436.06 587499.62 MWD+IFR+MS 8495.64 89.18 24.90 4451.20 4370.00 4511.11 -2788.15 0.00 5974523.27 587538.83 OBc 8500.00 89.18 24.90 4451.26 4370.06 4515.06 -2786.32 0.00 5974527.25 587540.62 MWD+IFR+MS 8600.00 89.18 24.90 4452.69 4371.49 4605.75 -2744.22 0.00 5974618.44 587581.62 MWD+IFR+MS 8700.00 89.18 24.90 4454.11 4372.91 4696.45 -2702.12 0.00 5974709.62 587622.62 MWD+IFR+MS 8796.77 89.18 24.90 4455.49 4374.29 4784.22 -2661.39 0.00 5974797.87 587662.29 MWD+IFR+MS 8800.00 89.21 24.77 4455.54 4374.34 4787.15 -2660.03 4.00 5974800.81 587663.61 MWD+IFR+MS 8896.35 90.00 21.00 4456.20 4375.00 4875.89 -2622.57 4.00 5974890.00 587700.00 V-203 L2 T4 8900.00 90.11 20.90 4456.20 4375.00 4879.30 -2621.26 4.00 5974893.42 587701.26 MWD+IFR+MS *. • S err -Sun P Y BP Planning Report Company; BP Amoco Date: 9/12/2005 Time: 14;33:25 Page: 3 Field: Prudhoe Bay Co-ordinate(NE) Reference: W eI1: Plan V-203 (N-A), True North Site: PB V Pad Vertical (TVD) Reference: 28.5+52.7 81.2- Well: Plan V-203 (N-A) Section (VS) Reference: Well (O.OON,O.OOE,342.03Azi) Wellpath: Plan V-203 L2 Survey Calculation Method: Minimum Curvature. Db: Oracle Survey MD Incl Azim TVD Sys TVD N/S E/W DLS MapN MapE TooUComme t ft deg deg ft ft ft ft deg/100ft ft ft 8936.51 91.22 19.95 4455.77 4374.57 4913.51 -2608.52 4.00 5974927.78 587713.59 MWD+IFR+MS 9000.00 91.22 19.95 4454.43 4373.23 4973.18 -2586.86 0.00 5974987.70 587734.53 MWD+IFR+MS 9100.00 91.22 19.95 4452.30 4371.10 5067.16 -2552.75 0.00 5975082.07 587767.50 MWD+IFR+MS 9200.00 91.22 19.95 4450.18 4368.98 5161.13 -2518.63 0.00 5975176.44 587800.48 MWD+IFR+MS 9300.00 91.22 19.95 4448.06 4366.86 5255.11 -2484.52 0.00 5975270.82 587833.45 MWD+IFR+MS 9400.00 91.22 19.95 4445.93 4364.73 5349.09 -2450.41 0.00 5975365.19 587866.43 MWD+IFR+MS 9500.00 91.22 19.95 4443.81 4362.61 5443.07 -2416.29 0.00 5975459.56 587899.41 MWD+IFR+MS 9600.00 91.22 19.95 4441.69 4360.49 5537.04 -2382.18 0.00 5975553.93 587932.38 MWD+IFR+MS 9607.78 91.22 19.95 4441.52 4360.32 5544.35 -2379.53 0.00 5975561.28 587934.95 MWD+IFR+MS 9638.21 90.00 20.00 4441.20 4360.00 5572.96 -2369.13 4.00 5975590.00 587945.00 V-203 L2 T5 9648.62 89.67 19.75 4441.23 4360.03 5582.74 -2365.59 4.00 5975599.83 587948.42 MWD+IFR+MS 9700.00 89.67 19.75 4441.53 4360.33 5631.10 -2348.23 0.00 5975648.38 587965.19 MWD+IFR+MS 9800.00 89.67 19.75 4442.10 4360.90 5725.22 -2314.45 0.00 5975742.89 587997.84 MWD+iFR+MS 9900.00 89.67 19.75 4442.68 4361.48 5819.34 -2280.66 0.00 5975837.40 588030.48 MWD+IFR+MS 10000.00 89.67 19.75 4443.25 4362.05 5913.45 -2246.88 0.00 5975931.91 588063.13 MWD+IFR+MS 10100.00 89.67 19.75 4443.83 4362.63 6007.57 -2213.09 0.00 5976026.42 588095.78 MWD+IFR+MS 10200.00 89.67 19.75 4444.41 4363.21 6101.69 -2179.31 0.00 5976120.93 588128.42 MWD+IFR+MS 10300.00 89.67 19.75 4444.98 4363.78 6195.81 -2145.52 0.00 5976215.44 588161.07 MWD+IFR+MS 10400.00 89.67 19.75 4445.56 4364.36 6289.93 -2111.74 0.00 5976309.95 588193.71 MWD+IFR+MS 10500.00 89.67 19.75 4446.14 4364.94 6384.04 -2077.95 0.00 5976404.46 588226.36 MWD+IFR+MS 10511.00 89.67 19.75 4446.20 4365.00 6394.40 -2074.24 0.00 5976414.86 588229.95 41/2" 1flffitt.15 89.67 19.75 4446.20 4365.00 6394.54 -2074.19 0.00 5976415.00 588230.00 V-203 L2 T6 • • TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO SE INCLUDED IN TRANSMITTAL LET/TER WELL NAME / ~ CSI //-' -~ D~~-~ ~.. PTD# ~.. ~ ~ w ~ 7D " " CHECK WHAT ADD-ONS CLUE APPLIES (OPTIONS) ment of se llb MiJLTI g ore The permit is for a new we ' LATERAL (If API number last two (2) digits existing well , Permit No, API No. Production should continue to be reported as a function of .the original API number stated i are between 60-69) above. all 005(f C 25 PILOT HOLE (p)~ ), . In accordance with 20 AA records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 - 70/80} from records, data and logs acquired for well (name on permit). t to full b SPACING EXCEPTION jec The permit is approved su compliance with 20 AAC 25.055. Approval to perforate and groduce/infect is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. d to the itt b DRY DITCH ° SAMPLE e m All dry ditch sample sets su Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Rev: 04/01/05 Cljody\transmittal_checklist WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, ORION SCHR BLOIL-640135 _ Well Name: PRUDHOE BAY UN ORIN V-203L2 __Program DEV Well bore seg [~( PTD#: 205170 Company BP EXPLORATION (ALASKA) INC _ Initial Classlfype DEV 11-OIL GeoArea _ Unit OnlOff Share On Annular Disposal Administration 1 Permit fee attached - Yes - - - 2 Lease number appropriate______ _______________________ ___-__---.Yes- -.____-_ 3 Unique well-name and number -- --- ------ - -- -~ -- -Yes- - - - --- --- ~- -- -- -- - - - -- - - -- -- --- -- - 4 Well locatedin_a_defined-pool__________-------- --------- ------ Yes_ - ___ i 5 Well located proper distance from drilling unit_boundary- - - - - - Yes - ... - - 6 Well located proper distancefrom other wells- - - - - - - - , Yes 7 Sufficientacreageavailablein-drilling unit______________________ __________Yes_ _.-_---___________________---_-_---__ __________.- 8 If deviated,is_vrellboreplat.included_________.------_-_--_ -- -_...-Yes_ _---__________________ 9 Operatotonlyaffectedparty._--_____--------,------- ---- Yes- ----------------- --------------------------------------------------- 10 Operatothas_appropriate-bond in force- - -- -- -- ----- ---- - Yes- -- -- - ----- -- ...-- ----- - - - - ---- --- - -- - ._ 11 Permit-can be issued withoutconseryati°n°rder_______-_-_--_-- ____ __-__Yes- ----------------------------------------- ---------------_--__-___-__---- Appr Date 12 Permit_c_an be issued with°utodministrative-approval - _ - . - - - - -Yes - RPC 11!10!2005 13 Can permit be approved before 15-day wait Yes 14 Welll°catedwithinareaandstrataauth°rizedbylnjecti°n Order#(put10#in-comments)_(For_ NA-- -----------------------_--_--_--___-..---.-------__.---.---.---_--__-_- 15 All wells within 114.mile area of review identified (For service well only}_ _ _ _ _ _ _ _ __ _ _ _ _ _ NA- - _ _ - _ _ _ - - _ - - _ _ _ _ _ _ _ . - 16 Pre-produced inject°r duration of preproduction less than3months_(Forservicewell°nly)__ NA__ __________________-.--_-_-_________----_----_______-_-.-___-__------__ 17 ACMP-Finding of Gonsist_ency_hasbeenissued_forthispro]ect------____ __ N_A_- -__-----_-______________-_-_------------------------------------------- Engineering 18 Conductorstring_provided---- -------------------------- ---- NA.- _--..-.____ ____-.------------------------_ -------------------- 19 Surface casing_protectsall-kn°wn. USDWs - - - - - - - - - - - - NA - - - - 20 CMT_vol-adequate-to circulate_on conductor-& surf_csg _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ _ _ _ _ - _ _ _ _ _ - - - _ - 21 CMT-voladeguate_t°tie-in long string to surfcsg_____.------- _____ NA_ ___ .....--_-.-,_ ____------------------------------ _-- 22 CMT-willcoverallknown-productiyehoriz°ns___________________ _____ ____ No-- __----Slotfed,______________-___-_--________-_-__--_.---____________-_--_---- 23 Casing designs adequatef°[G,T,B&_permafrost__----------- ---- Yes- ---.----------------------------.--.--------------------------------- 24 Adequatetan_kageorresenrepit_______________ __-..---.Yes_ -_--Nabors_9ES,__-_-_-------_- 25 If_a_re-drill, has-a-1.D-403 for abandonment been aRpr°ved _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ _ _ _ _ _ _ Lateral.- - - - - _ . -_.. -- 26 Adequatewellboreseparationproposed----- - - ------- -~-- ~ Yes. ------ -- ----------- -- - -- ----- -- - --- -- -------------- 27 If_diverterrequired,d°esitmeetregulations_____________________ ___-____-NA__ __ __-Sidetrack.-.__--..-.-_-.________-_---..-.----__________.-_-___-___-_____ Appr Date 28 Drillingfluid.pr°gramschematic_&equiplistadequate------ -------- ----------Yes_ ______MaxMW 9.6ppg,---.-----________--.----_--__--_- -_--__..--__-_- WGA 11/14120D5 29 BOPEs,dolhe meet_reulation._- y 9 Yes_ __________ _______________________________________________________________ 30 BOPE_pressratingappropriate;testto-(putpsiginc°mments)---------- ----------Yes_ __Testto3500_psi.-fvISP1528 psi.--_-_________-_--_--- _.--__-----_------_...-..-- 31 Choke_manif°IdcomplieswlAPI-RP-53~M_ay84)-----.----------- ----------Yes- ---------------------------------------------..----------------.------ 32 Work will°ccurwithout operationshutdow_n___---______________ __________Yes- __--------_____-____________--_-___-__________-..-__.-_-_______ --_.__ 33 Is presence-of H2S gas probable - NO - - Notan H2S pad. - - - 34 Mechanical condition of wells within AQR verified (For service well on_lya - _ _ - - NA. - _ _ - - Geology 35 Permit_canbeissuedwlohyd[ogen_&ul_fidemeasu[es_____ ________ __________Yes- _.--__ ----_-____-__ - - 36 Data-presented °n_ potential oyerpressur_e z°nes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ _ - _ _ - - _ - - . _ - - Appr Date 37 Seismic analysis °f shall°w gas_zones_ - - - - - - - . NA- _ _ - - - --- .. RPC 11110!2005 38 Seabed conditionsurye_y_(ifoff-shore)__----------- --------- ---- -----NA__ _-_______ 39 C°ntact namelph°ne_forweekly progress reports [exploratory only]_ - - - - - NA_ Geologic Engineering P sioner: Com mi s Date: sioner: Date Co ssio Comm i s Date / ~ p ~ { ~ 7 I `1 jl~ l~/ur' C~~~'c'`'/~fij /l`J ~ ~r ~~'~t~''~J •