Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout205-171~ s
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
Q2,Q~ j - 1 ~ ~ Well History File Identifier
Organizing (aone> ^ Two-sided III IIIIIIIIIII II III ^ Rescan Needed III IIII~I II II III IN
RESCAN
Color Items:
^ Greyscale Items:
^ Poor Quality Originals:
^ Other:
DIGITAL DATA
Diskettes, No. ~,
^ Other, No/Type:
OVERSIZED (Scannable)
^ Maps:
^ Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
^ Logs of various kinds:
NOTES:
BY: Maria
Date: ~
`j ^ Other::
/s/
Project Proofing (I (IIII (I II III I I III
BY: Maria Date: ~ S ~ /s/
Scanning Preparation _~ x 30 = ~Q_~ + ~ =TOTAL PAGES (o
BY: Maria _
Date: ~ l
l ~/Qg (Count does not include cover sheet)
lsl ~ `~
Production Scanning
Stage 7 Page Count from Scanned File: ~~ (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: ~ YES NO
BY: Maria Date: ~ l ~j ~ V /s/
Stage 1 If NO In stage 1, page(s) discrepancies were found: YES NO
BY: Maria Date: /s/
Scanning is complete at this point unless rescanning is required. III IIII~I III II (IIII
Rescanned II I II II II I ~ III I I III
BY: Maria Date: /s/
Comments about this file: Quality Checked
P
10/6/2005 Well History File Cover Page.doc
s ~
...
4 ~`1
~~.
~ ~
~.
~«~'.
av y
y ~
~.
IiA~ ~ r' ,,. "..
r `s ~ ~ x
~t' ; •4 ` ~
.MICROFILMED
6/3012010
DO NOT PLACE
ANY NEW MATERIAL
UNDER-THIS PAGE
C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc
1~ M~
DATA SUBMITTAL COMPLIANCE REPORT
5/12/2008
Permit to Drill 2051710 Well Name/No. PRUDHOE BAY UN GRIN V-203L3 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23285-62-00
MD 10595 TVD 4412 Completion Date 2/16/2006
REQUIRED INFORMATION
Mud Log No
DATA INFORMATION
Types Electric or Other Logs Run: MWD / GR / RES / Azimutal DEN / NEU /AIM
Well Log Information:
Log/ Electr
Data Digital Dataset
Ty MedlFrmt Number Name
D Asc ___ _ __
Directional Survey
pt Directional Survey
C Lis 15450~duction/Resistivity
Lgg
~ 15450 V
fnduction/Resistivity
~ ~
15450°' Induction/Resistivity
Well Cores/Samples Information:
Name
ADDITIONAL INFORMATION
Well Cored?
Chips Received? ~.LP1-~
Analysis Yom.
Received?
Comments:
- _ - -- --- - _II --
__ _ _ _- - --L = --
-(
Compliance Reviewed By: __ _ _ Date _ ~~(~
Completion Status 1-OIL Current Status 1-OIL UIC N
Samples No Directional Survey
(data taken from Logs Portion of Master Well Data Maint
Log Log Run Interval OH /
Scale Media No Start Stop CH Received Comments
0 10595 Open 3/20/2006
0 10595 Open 3/20/2006
94 10594 Open 9/28/2007 LIS Veri, GR, ROP, FET,
RH01, DRHO, NPHI
w/PDS and TIF graphics
2 Blu 6732 10595 Open 9/28/2007 MD Vision Service 5-Feb-
2006
!1,~ Blu 6732 10595 Open 9/28/2007 TVD Vision Service 5-Feb-
2006
Sample
Interval Set
Start Stop Sent Received Number Comments
Daily History Received? ~/ N
Formation Tops l./N
09/27107
•
Schtamherger
Schlumberger•DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503.2838
ATTN: Beth
Well Job #
Log Description
PLEASE ACKNOWLEDGE RECEIPT BY SIGNWG AND RfiTURNIf`~G`~O ~~~f5~~`En~H TO:
1 0 ~ '^...~ -.m ~~ ./ 1~ ~ tt . 1
,~
N0.4432
Company: Alaska Oi18 Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: P. Bay
Orion
Date BL Color CD
W-39 11216197 MCNL 0129106 1 1
V-215
V-203L2 40015122
40012957 OH EDIT MWD/LWD
OH EDIT MWD/LWD - 04/20/07
01/30/06 2
2 1.
1
V•203L3
V•203L4 40012957
40012957 OH EDIT MWD/LWD
OH EDIT MWD/LWD / 02105/06
02111106 2
2 1
1
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E Benson Blvd. CC'' pp (n~ (n~ "
Anchorage AK 99508-4254 ~',f"N,S~t U ~lJl~ll
Date Delivered: « r P~ t)Yt9)~)! 3;~lC283
r.
Schlumberger-DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Received by:
~'
F~ECEIVE ~~C ~/~~~`~
STATE OF ALASKA
JUL 2 ~ IL AND GAS CONSERVATION COM SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Alaska Oil & Gas Cans. Commission Revd: 07~25l06, Put on Production
1a. Well Status: ®Oil ^ lugged ^ Abandoned ^ Suspended ^ WAG
zoAACZS.~os zoAACZS.>>o
^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1b. Well Class:
®Development ^ Exploratory
^ Stratigraphic ^ Service
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.
2/16/2006 12. Permit to Drill Number
205-171
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
2/2/2006 13. API Number
50-029-23285-62-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
2/4/2006 14. Well Name and Number:
PBU V-203L3
FSL, 1920
4801
FEL, SEC. 11, T11N, R11E, UM
Top of Productive Horizon:
2280' FSL, 5215' FEL, SEC. 02, T11 N, R11 E, UM (OBa)
8. KB Elevation (ft):
81.2'
15. Field /Pool(s):
Prudhoe Bay Field / Orion
Total Depth:
616' FSL, 3944' FEL, SEC. 35, T12N, R11E, UM 9. Plug Back Depth (MD+TVD)
10595 + 4412 Ft Schrader Bluff
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 590381 y- 5970046 Zone- ASP4 10. Total Depth (MD+TVD)
10595 + 4412 Ft 16. Property Designation:
ADL 028238
TPI: x- 587051 y_ 5972765 Zone- ASP4
Total Depth: x- 588274 y- 5976396 Zone- ASP4 11. Depth where SSSV set
N/A MD 17. Land Use Permit:
18. Directional Survey I~ Yes ^ No 19. Water depth, if offshore
N/A MSL 20. Thickness of Permafrost
1900' (Approx.)
21. Logs Run:
MWD / GR / RES / Azimuthal DEN / NEU !AIM
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING' DEPTH MD SETTING DEPTN'IVD HOLE AMOUNT
SIZE WT. PER FT. GRADE TOP BOTTOM TOP: BOTTOM SIZE CEMENTING RECORD PULLED
20" x 34" 215.5# A53 Surface 110' Surface 110' 48" 260 sx Arctic Set A r x.
10-3/4" 45.5# L-80 29' 3435' 29' 2679' 13-1/2" 625 sx AS Lite 451 sx Class'G'
7-5/8" 29.7# L-80 26' 7 2' 26' 4357' 9-7/8" 300 sx Class'G' 13 sx Class'G'
4-1/2" 12.6# L-80 6671' 10576' 4332' 4412' 6-3l4" Uncemented Slotted Liner
23. Perforations open to Production (MD + TVD of Top and 24. TUBING. RECORD
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD
4-1/2" Slotted Section 4-1/2", 12.6#, L-80 6504' 6429'
MD TVD MD TVD
7246' - 10534' 4387' -4412' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED
2775' Freeze Protect w/ 115 Bbls of Diesel
26. PRODUCTION TEST
Date First Production:
Reported on V-203 Method of Operation (Flowing, Gas Lift, etc.):
See V-203 10-407 (Dated 07/25/06, PTD # 205-168) for Production & Test Data
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
FIOW TUbing
PreSS. CaSing PreSSUre CALCULATED
24-HOUR RATE OIL-BBL GAS-McF WATER-BBL OIL GRAVITY-API (CORK)
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". ~~~5 vr~ ~~~ ~ ~' 2flo~
vi~ ~~~5 ~~, .-~ ~I ~ ~ 2006
None
Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE
28 ` GEOLOGIC (MARK 29. ORMATION TESTS
Include and brie ummarize test results. List intervals tested,
NAME MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Schrader Bluff OBa 6734' 4358' None
Schrader 81uff OBb 6860' 4398'
Schrader Bouff OBb 7179' 4398'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foreg ing is true and correct to the best of my knowledge.
~~~/~
Signed Terrie Hubble Title Technical Assistant Date
PBU V-203L3 205-171 Prepared By Namemlumber. Terrie Hubble, 564-4628
Well Number Permit No. / A rOVal NO. Drilling Engineer: SCOtt Kolstad, 564-5347
INSTRUCTIONS
GeNewu: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in
other spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Irene 20: True vertical thickness.
IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
IreM 27: If no cores taken, indicate "None".
IreM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
STATE OF ALASKA
ALAS~IL AND GAS CONSERVATION CO SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status:®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG
zoAAC zs.,os zoAAC zs.,,o
^ GINJ p WINJ ^ WDSPL No. of Completions One Other 1b. Well Class:
®Development ^ Exploratory
^ Stratigraphic ^ Service
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.
2/16/2006 12. Permit to Drill Number
205-171
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
2/2/2006 13. API Number
50-029-23285-62-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
2/4/2006 14. Well Name and Number:
PBU V-203L3
4801
FSL, 1920
FEL, SEC. 11, T11 N, R11 E, UM
Top of Productive Horizon:
2280' FSL, 5215' FEL, SEC. 02, T11 N, R11 E, UM (OBa) g, KB Elevation (ft):
81.2' 15. Field /Pool(s):
Prudhoe Bay Field / Orion
Schrader Bluff
Total Depth:
616' FSL, 3944' FEL, SEC. 35, T12N, R11 E, UM 9. Plug Back Depth (MD+TVD)
10595 + 4412 Ft
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 590381 y- 5970046 Zone- ASP4 10. Total Depth (MD+TVD)
10595 + 4412 Ft 16. Property Designation:
ADL 028238
TPI: x- 587051 y- 5972765 Zone- ASP4
Total Depth: x- 588274 Y- 5976396 Zone- ASP4 11. Depth where SSSV set
N/A MD 17. Land Use Permit:
18. Directional Survey ®Yes ^ No 19. Water depth, if offshore
N/A MSL 20. Thickness of Permafrost
1900' (Approx.)
21. Logs Run:
MWD / GR / RES / Azimuthal DEN / NEU /AIM
22. ASING, LINER AND EMENTING ECORD
CASING ETTING EPTH MD ETTING EPTH TVD HOLE OUNT
SIZE WT. PER FT. GRADE Op OTTOM Op OTTOM SIZE CEMENTING RECORD PULLED
20" x 34" 215.5# A53 Surface 110' Surface 110' 48" 260 sx Arctic Set A prox.)
10-3/4" 45.5# L-80 29' 3435' 29' 2679' 13-1/2" 625 sx AS Lite, 451 sx Class 'G'
7-5/8" 29.7# L-80 26' 6732' 26' 4357' 9-718" 300 sx Class 'G', 313 sx Class 'G'
4-1/2" 12.6# L-80 6671' 10576' 4332' 4412' 6-3/4" Uncemented Slotted Liner
23. Perforations open to Production (MD +TVD of Top and
"
" 24. TUBING RECORD
Bottom Interval, Size and Number; if none, state
none
): SIZE DEPTH SET (MD) PACKER SET (MD)
4-1 /2" Slotted Section 4-1 /2", 12.6#, L-80 6504' 6429'
MD TVD MD TVD
7246' - 10534' 4387 -4412' 2~j, ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL MD AMOUNT $c KIND OF MATERIAL USED
2775' Freeze Protect w/ 115 Bbls of Diesel
26• PRODUCTION TEST
Date First Production:
Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): ~v
N/A
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CI+lt?#QE SIZE GAS-OIL RATIO
Flow Tubing
Press. Casing .Pressure CALCULATED
24-HouR RATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-A " I (GORR)
27. CORE DATA
Brief description of lithofogy, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None ~.. ~~ s ®~~- M~~: 61 ) o ~ e~~~°"`1 N~Q~7 y~ ~3~~ '~j/0
t ~~
~'.
• ~_..__
Form 10-407 'Revised 12/2003 CONTINUED ON REVERSE SIDE
?8. GEOLOGIC MARKE 29. ORMATION TESTS
Include and briefly summarize test results. List intervals tested,
NAME MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Schrader Bluff OBa 6734' 4358' None
Schrader Bluff OBb 6860' 4398'
Schrader Bouff OBb 7179' 4398'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and con'ect to the best of my knowledge. /
~
l Z'S/~`
Signed Terrie Hubble Title Technical Assistant Date v
PBU V-203L3 205-171 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. !Approval No. Drlr~ing engineer: Scott xolstad, 564-5347
INSTRUCTIONS
GeNeRa~: This form is designed for submitting a complete and correct well completion report and iog on all types of lands and leases in
Alaska.
beat 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
Irene 4b: TPI (Top of Producing Interval).
Irene 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Irene 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Irene 20: True vertical thickness.
Irene 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool
beat 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
beat 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
Irene 27: If no cores taken, indicate "None".
bear 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003 Submit Original Only
BP Page 1 of 1
Leak-Off Test Summary
Legal Name: V-203
Common Name: V-203
Test Date Test Type Tesf'bepth'(TMD) Test Depth (TVD) AMW Surface Pressure 'Leak Off Pressure (BHP) EMW
1/12/2006 LOT 3,434.0 (ft) 2,677.0 (ft) 8.80 (ppg). 640 (psi) 1,864 (psi) 13.40 (ppg)
1/17/2006 FIT 7,322.0 (ft) 4,525.0 (ft) 9.20 (ppg) 545 (psi) 2,708 (psi) ~ i1.52 (ppg)
J
i
Printed: 2/21/2006 10:57:40 AM
gp Page 1 of 23
Operations Summary Report
Legal Well Name: V-203
Common WeII Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Da#e From - To Hours Task Code NP' Phase :Description of Operations
1/6/2006 12:00 - 12:30 0.50 RIGD P PRE Rig down lines, prep rig floor to lay down derrick.
12:30 - 13:00 0.50 RIGD P PRE Unpin topdrive, rig up bridle line to blocks.
13:00 - 13:30 0.50 RIGD P PRE Rig down pipe Shute.
13:30 - 14:00 0.50 RIGD P PRE Lay down derrick.
14:00 - 15:00 1.00 MOB P PRE Move mud pits from L-pad to V-pad.
15:00 - 17:00 2.00 MOB P PRE Move rig off of L-1231 and position at pad entrance.
17:00 - 19:00 2.00 MOB P PRE Rig down diverter lines behind well with crane. Set surface
hydril on moving pedestal. Secure bridge crane to BOP stack.
19:00 - 20:30 1.50 MOB P PRE Move rig from L-pad to V-pad.
20:30 - 22:00 1.50 MOB P PRE Position rig to move over V-203.
22:00 - 22:30 0.50 MOB P PRE Set matting boards and herculite around well.
22:30 -00:00 1.50 MOB P PRE Spot rig over V-203.
1/7/2006 00:00 - 02:00 2.00 MOB P PRE PJSM with Peak. Spot mud pits.
02:00 - 02:30 0.50 RIGU P PRE Raise and pin derrick.
02:30 - 03:00 0.50 RIGU P PRE Hook up all lines at mud pit interconnect.
`Accept rig for operations on V-203 ~ 03:00 1/7/2006.
03:00 - 06:00 3.00 DIVRTR P PRE Rig up diverter tines, take on water in mud pits.
06:00 - 07:30 1.50 RIGU P PRE Bridle down, pin blocks to topdrive, hang bridle I'rnes.
07:30 - 14:00 6.50 DIVRTR P PRE Change out 16" riser air boot to 20" riser adapter. NU riser,
install 4" dump valves, berm cetlar containment, connect
ground strap, winterize cellar walls. Mix spud mud. Prep
pipeshed.
14:00 - 15:00 1,00 RIGU P PRE Clean rig.
15:00 - 20:30 5.50 RIGU P PRE Sort all drill pipe in pipeshed and on location due to difference
of weight identification grooves on drill pipe.
20:30 -00:00 3.50 RIGD P PRE Pick up 90 jts 4" i5.7# HT-40 drill pipe and stand back in
derrick.
1/8/2006 00:00 - 00:30 0,50 RIGU P PRE Continue picking up and racking drill pipe in derrick for total of
105 jts, 35 stands.
Held Pre Spud meeting during the Pre Tour Safety Meeting'
00:30 - 01:00 0.50 RIGU P PRE Pick up BHA tools up beaver slide to rig floor,
01:00 - 02:00 1.00 RIGU P PRE Pick up and stand back 24 jts 4" HT-40 HWDP and JAR/DC
stand.
02:00 - 03:30 1.50 DRILL P PRE Pick up used 13.5" bit and BHA #1 and orient MWD and motor.
03:30 -04:00 0.50 DIVRTR P PRE Perform Diverter function test and drill. Wifiess of test waived
by AOGCC rep. Chuck Scheve. Test witnessed by BP WSL
Robert French and NAD TP Brian Tiedemann.
04:00 - 05:00 1.00 RIGU P PRE Rig up Sperry Photo Gyro tools and stick line,
05:00 - 05:15 0.25 RIGU P PRE Fill surface stack, check for leaks - OK
05:15 - 05:30 0.25 DRILL P SURF Spud well V-203 ~ 05:15 hr 1/8/2006. Drill directionally from
108' to 171'. 530 gpm, 650 psi, 50 rpm, f .2K TQ
05:30 - 07:30 2.00 DRILL P SURF CBU, Gyro photo single shot survey ~ 171'.
07:30 -08:00 0.50 DRILL P SURF Drill directionally from 171' to 268'. 530 gpm, 650 psi, 50 rpm,
1.2k TQ
08:00 - 09:00 1.00 DRILL P SURF CBU, Gyro photo single shot survey ~ 268'.
09:00 - 10:30 1.50 DRILL P SURF Drill directionally from 268' to 362'. 600 gpm, 760 psi off bot,
900 psi on bottom, 50 rpm, 1.2k TO off bottom, 3.3k TO on
bottom, WOB - 20k, PU - 60k, SO - 58k, RT - 60k.
10:30 - 11:00 0.50 DRILL P SURF Circulate bottoms up for TOH. 600 gpm, 760 psi. MW - 8.8
pPg-
11:00 - 12:00 1.00 DRILL P SURF POOH from 362' to 171' for jar stand.
P~~,red: 2rzrnoos fo:s~:asaM
BP Page 2 of 23
Operations. Summary Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT' Phase Description of Operations
1/8/2006 12:00 - 13:30 1.50 DRILL N RREP SURF Change out mud pump pulsation dampener. (Non Billable NPT
Rig Repair - expendable pump parts.)
13:30 - 14:30 1.00 DRILL P SURF Pick up JAR / DC stand and TIH. Washed from 270' to 362'.
14:30 - 15:00 0.50 DRILL P SURF Gyro photo single shot survey ~ 362'.
15:00 - 16:00 1.00 DRILL P SURF Drill directionally from 362' to 454'. 600 gpm, 1260 psi off bot,
1330 psi on bottom, 60 rpm, 3.1 k TO off bottom, 4.7k TO on
bottom, WOB - 20k, PU - 72k, SO - 72k, RT - 72k.
16:00 - 17:00 1.00 DRILL N RREP SURF Change out topdrive lubricator pump pressure switch. (1 hr
Billable NPT Rig Repair)
17:00 - 17:30 0.50 DRILL P SURF Gyro photo single shot survey ~ 454'.
17:30 - 18:30 1.00 DRILL P SURF Drill directionally from 454' to 546'.
18:30 - 19:00 0.50 DRILL P SURF Gyro photo single shot survey ~ 546'.
19:00 - 23:30 4.50 DRILL P SURF Drill directionally from 546' to 914'. 600 gpm, 1375 psi off bot,
1465 psi on bottom, 60 rpm, 2.1 k TO off bottom, 3.9k TO on
bottom, WOB - 20k, PU - 75k, SO - 73k, RT - 75k.
ART - 1.73 hrs, AST - 4.38 hrs.
23:30 - 00:00 0.50 DRILL P SURF Gyro photo single shot survey C~? 914'.
1/9/2006 00:00 - 06:00 6.00 DRILL P SURF Drill directionally from 914' to 1377'. 600 gpm, 1500 psi off bot,
1800 psi on bottom, 80 rpm, 3k TO off bottom, 6k TO on
bottom, WOB - 30k, PU - 85k, SO - 80k, RT - 80k.
06:00 - 06:30 0.50 DRILL P SURF Rig down Sperry photo gyro tools and slickline while circulating.
06:30 - 09:00 2.50 DRILL P SURF Drill directionally from 1377' to 1657'. 600 gpm, 1790 psi off
bot, 2100 psi on bottom, 80 rpm, 3k TQ off bottom, 6k TO on
bottom, WOB - 30k, PU - 90k, SO - 80k, RT - 80k.
ART - .75 hrs, AST - 6.38 hrs.
09:00 - 10:30 1.50 DR-LL P SURF Circulate bottoms up X 3. 715 gpm, 2330 psi, RPM - 80, TO -
2k, MW - 9.1 PP9•
10:30 - 12:00 1.50 DRILL P SURF POH with BHA #1 from 1657' to 362'. PU - 95k, SO - 75k.
12:00 - 12:30 0.50 DRILL P SURF Stand back JAR 1 DC stand, lay down UBHO sub.
12:30 - 13:00 0.50 DRILL P SURF Change out bit, adjust motor bend from 1.83 deg to 1.5 deg.
13:00 - 13:30 0.50 DRILL P SURF RIH w/ BHA #2 to 110'. Add STAB in DC stand.
13:30 - 14:00 0.50 DRILL P SURF Service topdrive and crown.
14:00 - 16:00 2.00 DRILL P SURF RIH w/ BHA #2 from 110'. Took weight from 440' to 500',
worked pipe through OK. Set down at 708'. Ream out as
needed to 1380'. Washed down last stand to bottom.
16:00 -00:00 8.00 DRILL P SURF Drill directionally w/ BHA #2 from 1657' to 2780'. 715 gpm,
3295 psi off bot, 3335 psi on bottom, 80 rpm, 7.1 k TQ off
bottom, 8.9k TO on bottom, WOB - 35-40k, PU - 103k, SO -
70k, RT - 82k.
ART - .75 hrs, AST - 6.38 hrs.
'Encountered Hydrates ~ 2220' and diminished. Hydrates
returned at 2627' to 2667'.'
1!10/2006 00:00 -03:00 3.00 DRILL P SURF Drill directionalty w/ BHA #2 from 2780' to 3444'. 715 gpm,
3440 psi off bot, 3520 psi on bottom, 80 rpm, 4.2k TQ off
bottom, 7.2k TQ on bottom, WOB - 35-40k, PU -110k, SO -
70k, RT - 85k.
ART - 1.57 hrs, AST - 1.06 hrs.
TD 13.5" surface hole - 3,444' ~ 03:00 1/10/2006
03:00 -04:30 1.50 DRILL P SURF Circulate bottoms up X 3 ~ 700 gpm, 3,380 psi, 100 rpm, 4k
TD. MW - 9.6 ppg.
04:30 - 07:30 3.00 DRILL P SURF Monitor well - OK. POH, short trip to HWDP. PU - 110k, SO -
75k. POH from 3444'. Work through tight spot ®3417'. Tight
at 1806', pump out from 1939' to 1753' ~ 60 rpm, 4.5k TQ,
Printed: 2/21/2006 10:57:46 AM
BP, Page 3 of 23
Operations Summary Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABORS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of .Operations
1/10/2006 04:30 - 07:30 3.00 DRILL P SURF 620 gpm, 2040 psi. POH without pumping from 1753' to tight
spot ~ 1511'. Pump out from 1568' to 1475' with same
parameters. POH without pumping from 1475' to HWDP ~
1006'.
07:30 - 09:00 1.50 DRILL P SURF RIH from 1006' to 2765'. Set down and pump down from 2765
to 2873' ~ 575 gpm, 2340 psi, 60 rpm, 5k TQ. RIH without
pumping from 2873'. Wash down last stand.
09:00 - 10:30 1.50 DRILL P SURF Circulate bottoms up X 3 ~ 700 gpm, 3,300 psi, 80 rpm, 4.5k
TO. MW - 9.5 ppg.
10:30 - 13:00 2.50 DRILL P SURF Monitor well - OK. POH from 3444' to 1006'. Intermittent drag,
15-25k to 1770'.
13:00 - 13:30 0.50 DRILL P SURF POH with 8 stands HWDP, JAR, DC stand to 110'.
13:30 - 15:00 1.50 DRILL P SURF Lay down BHA #2.
15:00 - 15:30 0.50 DRILL P SURF Clear and clean rig floor.
15:30 - 17:30 2.00 CASE P SURF Rig up to run 10 3/4" casing. Make hanger dummy run.
17:30 - 18:00 0.50 CASE P SURF PJSM for running casing. Pick up shoe joint. Nose cone on
shoe broke apart as it was brought up skate.
18:00 - 20:00 2.00 CASE N SFAL SURF Wait on HOWCO float shoe.
20:00 -00:00 4.00 CASE P SURF Make up and Baker-Lok shoe and float track, check floats -
OK. RIH per running detail with 103/4" 45.5# L-80 BTC casing
to 1141'. Made up casing to 9000 fUlbs TQ, lubricated with
BOL NM 2000. Fill each joint with fill-up tool.
1/11/2006 00;00 - 10:30 10.50 CASE P SURF Continue RIH with 103/4" 45.5# L-80 BTC casing from 1141' to
3403". Work through tight hole starting ~ 1997'. Work down 3
jts to 2130' without pumping. Work casing down with pump
from 2130' to 3403'. 205 gpm, 415 psi.
d 0:30 - 11:00 0.50 CASE P SURF Rig down franks fill-up tool.
11:00 - 11:30 0.50 CASE P SURF Land casing on depth ~ 3434'. Make up cementing head.
Ran total of 83 jts 103/4" 45.5 L-80 BTC casing
Float shoe ~ 3434'
2 jts i0 3/4' 45.5 L-80 BTC casing
Float collar ~ 334T
85 jts 10314" 45.5 L-80 BTC casing to surface
11:30 - 13:00 1.50 CEMT P SURF Circulate for surface cement job. Stage up pumps to 8 bpm,
550 psi. Reciprocate casing with full retums.
13:00 - 16:00 3.00 CEMT P SURF Hold PJSM. Line up to Schlumberger and pump 5 bbls of
water ahead. Shut down and pressure test the lines to 3,500
psi. Bleed off pressure. Pump 80 bbls of 10.1 ppg Mudpush II
spacer at 5 bpm, ICP - 180 psi, FCP -130 psi Shut down, drop
bottom plug and batch 10.7 ppg ArcticSet Lite lead slurry.
Pump 475 bbls of lead cement at 6.7 bpm, ICP - 280 psi, FCP
- 330 psi. Batch up 15.8 ppg Class G tail slurry. Pump 93 bbls
of tail slurry at 5.3 bpm, ICP -350 psi, FCP -300 psi. Shut
down, drop top plug and displace with 10 bbls of fresh water.
Shut down and swap lines from Schlumberger to the rig.
Displace with mud using the rig at 7 bpm, ICP - 150 psi.
Dropped rate to 2 bpm, FCP - 500 psi and bumped the plug to
1,500 psi with 313 bbls pumped and 95% efficiency. CIP ~
16:00 hr 1111/2006. Check floats -holding. Had full retums
throughout the cement job. 180 bbls of 10.7 ppg cement
returned to surface. Reciprocate casing throughout cement job
Printed: 2/21/2006 10:57:46 AM
BP Page 4 of 23
Operations Summary Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16!2006
Rig Name: NABORS 9ES Rig Number:
-Date From - To Hours Task Code NPT Phase Description of Operations.
1/11/2006 13:00 - 16:00 3.00 CEMT P SURF until 40 bbls of tail slurry away.
16:00 - 17:00 1.00 CEMT P SURF Rig down Dowell (Schlumberger and casing equipment
17:00 - 20:00 3.00 DIVRTR P SURF Nipple down diverter system. Change out drilling nipple from
20" to 16". Clean under rotary table.
20:00 - 00:00 4.00 BOPSU P SURF Nipple up casing head and tubing spool. Test metal to metal
seal to 5000 psi - 10 min - OK. Nipple up BOPE
1/12/2006 00:00 -00:30 0.50 BOPSU P SURF Continue nipple up BOPE.
00:30 - 01:30 1.00 BOPSU P SURF Change out topdrive quill, adjust foot.
Oi :30 -06:00 4.50 BOPSU P SURF Rig up and test ROPE to 3500 psi high pressure, 250 low
pressure. Test witnessed by AOGCC rep Lou Grimaldi, BP
WSL Robert French, NAD TP Roy Hunt. Rig down ROPE test
equipment. Install wear bushing
06:00 - 07:30 1.50 BOPSU P SURF Service rig and topdrive.
07:30 - 08:00 0.50 BOPSU P SURF Bring BHA tools to rig floor.
08:00 - 12:30 4.50 BOPSU P SURF Pick up 72 jts 4" drill pipe 1 X 1 and stand back in derrick.
12:30 - 15:00 2.50 DRILL P INT1 Pick up and make up 9 718" directional BHA #3. Shallow hole
test MWD - OK.
15:00 - 16:00 1.00 DRILL P INT1 RIH with BHA #3 picking up drill pipe 1 X 1 to 2110'.
16:00 - 16:30 0.50 DRILL P INT1 Perform benchmark ECD test with Ghost reamer in and out of
casing. Incasing - 9.72 ppg, out of casing - 9.60 ppg .12 ppg
difference.
16:30 - 18:00 1.50 DRILL P INTi Continue RIH picking up drill pipe 1 X 1 to 3298'.
18:00 - 19:00 1.00 DRILL P INTi Pressure test 10 3/4" casing to 3500 psi - 30 minutes - 0 psi
loss.
19:00 - 20:15 1.25 DRILL P INT1 Wash down from 3298' to top of float collar on depth ~ 3347'.
Drill out float collar, cement ,float shoe and rat hole from 3347'
to 3444'. 600 gpm, 2400 psi on bottom, 2310 psi off bottom,
60 rpm, 6.2k TO on, 5.1 k TO off.
20:15 - 20:30 0.25 DRILL P INT1 Drill 20' of new hole from 3444' to 3464'.
20:30 - 21:30 1.00 DRILL P INTi Displace well from 9.4 ppg mud to 8.8 ppg LSND mud ~ 307
gpm, 520 psi.
21:30 - 22:00 0.50 DRILL P INT1 Circulate bottoms up for LOT ~ 700 gpm, 1580 psi.
22:00 -22:30 0.50 DRILL P INT1 Perform LOT. TVD - 2,677', MW - 8.8 ppg, PSI -640 psi,
EMW - 13.4 ppg.
22:30 - 23:30 1.00 DRILL P INT1 Obtain benchmark ECD's. Base ECD - 9.20 ppg, Max ECD -
10ppg
23:30 -00:00 0.50 DRILL P INT1 Directionally drill 9 7/8" intermediate hole from 3,464' to 3,584'.
PU - 120k, SO - 74k, RT - 90k, WOB - 10k, GPM - 700, PSI
ON - 1,750, PSI OFF - 1,530, RPM - 61, TO ON - 6k, TQ OFF -
5.2k, CECD - 9.2 ppg, AECD - 9.34 ppg, AST - 0 hrs, ART -
.38 hrs.
1/13/2006 00:00 - 22:00 22.00 DRILL P INT1 Directionally drill 9 7/8" intermediate hole from 4,620' to 6,773'.
PU - 141k, SO - 101k, RT - t 16k, WOB - iQ-20k, GPM - 7Q0,
PSI ON - 3,210, PSI OFF - 3,080, RPM - 60, TO ON - 10k, TQ
OFF - 5k, CECD - 9.61 ppg, AECD - 9.97 ppg, AST - 6.75 hrs,
ART - 5.77 hrs.
22:00 - 00:00 2.00 DRILL P INTi MadPass log per geologist from 6,773 to 6,400' due to spikes
in neutron density logs while drilling through critical OA sands
interval. FPH -400, GPM - 700, PSI - 3,030, RPM - 60, TO -
5k, CECD - 9.61 ppg, AECD - 9.92 ppg, AST - 6.75 hrs, ART -
5.77 hrs.
1/14/2006 00:00 -00:30 0.50 DRILL P INT1 RIH from 6,400' to 6,773' after MadPass. PU - 140k, SO 97k.
00:30 -04:45 4.25 DRILL P INT1 Directionally drill 9 7/8' (ntermediate hole from 6,773" to 7,300'
Printed: 2/21/2006 10:57:46 AM
BP Page 5 of 23
Operations Summary Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Oate: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours 'Task Code NPT Phase Descrjption of Operations
1/14/2006 00:30 -04:45 4.25 DRILL P INTi TD. PU - 137k, SO - 91 k, RT - 114k, WOB - 20k, GPM - 690,
PSI ON - 3,400, PSI OFF - 3,200, RPM - 60, TO ON - 7k, TO
OFF - 5k, CECD - 9.68 ppg, AECD - 10.1 ppg. TD 9 7/8"
section ~ 04:45 hr 1/14/2006. AST - 2.53 hrs, ART - .60 hrs.
Tops:
OA - 6,577'
OBa - 6,734'
OBb - 6,833'
OBc - 6,994'
OBd - 7,180'
04:45 - 06:30 1.75 DRILL P INTi Circulate high viscosity sweep around ~ 690 gpm, 3200 psi,
80 rpm, 7k TO, CECD - 9.68 ppg, initial AECD - 10.1 ppg, final
AECD - 9.93 ppg. MW - 9.2 ppg.
06:30 - 10:30 4.00 DRILL P INT1 Monitor well - OK. MadPass log from 7,300' to 6,000'. 655
gpm, 2,985 psi, 70 rpm, 5k TO, PU - 121 k.
10:30 - 13:00 2.50 DRILL P INT1 Backream from 6,000' to 5,190'. 700 gpm, 2,730 psi, 60 rpm,
5k TO. CECD - 9.68, AECD - 10.03 ppg.
13:00 - 14:00 1.00 DRILL P INT1 POH without pumping from 5,190' to 3,298'. No drag, no
problems. PU - 125k, SO - 75k.
14:00 - 15:00 1.00 DR1LL P INT1 Circulate high viscosity sweep around ~ 700 gpm, 2730 psi,
60 rpm, 3k TO.
15:00 - 16:00 1.00 DRILL P INT1 Cut and slip drilling line 78'.
16:00 - 16:30 0.50 DRILL P INTi Service topdrive, crown and traveling blocks.
16:30 - 18:00 1.50 DRILL P INTi POH from 3,298' to 260'. PU - 100k, SO - 75k ~ shoe.
18:00 - 20:00 2.00 DRILL P INT1 PJSM with SLB MWD on nucleur source. Laydown BHA #4.
20:00 - 21:00 1.00 DRILL P INT1 Clear and clean rig floor.
21:00 - 22:00 1.00 CASE P INT1 Pull wear bushing, flush stack, install test plug.
22:00 - 23:50 1.83 CASE P INT1 Change upper pipe rams from 3.5° x 6" VBRs to 7 5/8". Test
ram door seals to 3,500 psi - OK.
23:50 - 00:00 0.17 CASE P INTi Rig up to run 7 5/8" casing. Change out bales, rig up casing
fill-up tool.
1/15/2006 00:00 -00:30 0.50 CASE P INT1 Finish rigging up to run casing.
00:30 - 09:00 8.50 CASE P INT1 PJSM on running casing. Make up shoe track, Baker-Lok
same to one joint above float collar. Checked floats - OK.
Continue RIH to 3,415' per running detail with 7 5/8' 29.7# L-80
BTC/STL casing. 10k ft/Ibs MU TO on BTC using Best O Life
2000 NM lubricant. 5.6k ft/ibs MU TQ on STL using Jet Lube
Seal Guard. Fill each jant, break circulation every 10 joints for
5 minutes in casing. RIH ~ 80 fpm in casing with correct
displacement.
09:00 -09:30 0.50 CASE P INT1 Circulate 1.5 times annulus volume by staging pumps up to 7
bpm, 480 psi. PU - 129k, SO 103k.
09:30 - 16:30 7.00 CASE P INT1 Continue RIH ~ 40 fpm with 7 5/8" casing from 3,415' to
5,579'. Break circulation every 5 joints, circulate 10 min every
15 joints.
16:30 - 18:30 2.00 CASE N RREP INT1 Circulate and reciprocate pipe while repairing casing hydraulic
power unit ~ 4.7 bpm, 390 psi.
18:30 -22:30 4.00 CASE P INT1 Continue RIH ~ 40 fpm with 7 5/8" casing from 5,579' to
landing depth of 7,29f'. Break circulation every 5 joints,
circulate 10 min every 15 joints. No mud lost during entire trip
in hole.
Printed: 2/21/2006 10:57:46 AM
BP Page 6 of 23
Operations Summary Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABORS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
1/15/2006 18:30 - 22:30 4.00 CASE P INTi Ran total of 76 jts (includes 4 RA marker joints) 7 5/8" 29.7#
L-80 BTC-M casing,
106 jts 7 5/8° 29.7# L-80 STL casing
1 X-over jt 7 5/8" STL box XBTC-M pin
2 BTC-M pup joints
1 STL pup joints.
Shoe ~ 7,291'
Tops:
OBd RA tag ~ 7,046'
FC ~ 7,208'
OBb RA tag ~ 6,784'
OBa RA tag ~ 6,68T
OA RA tag ~ 6,524'
22:30 - 23:00 0.50 CASE P INT1 Rig down casing till-up tool, rig up casing cementing head.
23:00 - 00:00 1.00 CASE P INT1 Break circulation and stage up pumps from 2 bpm, 220 psi to 7
bpm, 540 psi. Reciprocate casing with full returns. PU - 200k,
SO - 110k.
1/16/2006 00:00 - 02:00 2.00 CASE P INTi Continue circulate and reciprocate 7 518" casing. 7 bpm 560
psi PU - 200k, SO - 110k. Held cement PJSM while
circulating. Had full retums during circulation.
02:00 -04:00 2.00 CEMT P INT1 Switch to Dowell. Pump 5 bbls H2O. Shut down. Pressure
test surface cementing lines to 4,000 psi - OK. Pump 20 bbls
CW-100 followed by 40 bbls 10.5 ppg MudPush Spacer. Shut
down. Drop bottom plug and pump 64.1 bbl 15.8 ppg "G'
Durablend batched mixed lead cement ~ 5.2 bpm, 350 psi.
Switch tanks and pump 54 bbls 16.3 ppg 'G" Durastone
batched mixed tail cement ~ 5.2 bpm, 200 psi. Shut down,
drop top plug and kick out with 10 bbls H2O. Shut down,
switch to rig pumps and pump 310 bbls of seawater ~ ICP - 7
bpm, 150 psi, FCP - 7 bpm, 1,475 psi. Slow pumps down to 3
bpm, 1200 psi. Bump plug with calculated displacement of 321
bbls ~ 95% with 2,000 psi. Bleed pressure off. Check floats -
OK. Bumped dug ~ 04:00 hr 1116!2006. Had full retums
throughout job. Stopped pipe reciprocation with 293 bbls of
seawater away.
04:00 -06:00 2.00 CEMT P INT1 Blow down surface lines. Rig down Dowell and casing running
equipment. Lay down landing joint, change out bails.
06:00 - 07:00 1.00 WHSUR P INT1 Install 7 5/8` x 103/4' packoff. Test same to 5,000 psi - 10
min - OK.
07:00 - 08:00 1.00 BOPSU P INT1 Change out top pipe rams from 75/8" to 3.5" x 6" VBRs. Test
door seals to 3,500 psi - OK.
08:00 -08:30 0.50 WHSUR P INT1 Pull test plug, install wear bushing.
08:30 -09:00 0.50 DRILL P PRODi Pick up BHA toots from beaver slide.
09:00 - 10:00 1.00 EVAL P PROD1 Perform 75/8' annulus infectivity test. 2 bpm - 800 psi, 3 bpm
- 850 psi, 4 bpm -900 psi, 4 bpm -900 psi, 5 bFxn -900 psi.
Leak off pressure - 700 psi, EMW - 14.2 ppg.
10:00 - 13:00 3.00 DRILL P PROD1 PJSM on BHA and nuclear source. Make up 6.75" directional
drilling assembly. (BHA #4)
13:00 - 14:00 1.00 DRILL P PROD1 RIH with BHA #4 on drill pipe to 500'.
14:00 - 15:00 1.00 DRILL P PROD1 Inject 115 bbls 9.2 ppg mud down 7 5/8" x 103/4" annulus ~
2.5 BPM, 800 psi, SIP -640 psi.
15:00 - 16:00 1.00 DRILL P PROD1 LRHOS freeze protect 75/8" annulus with 85 bbls 70 deg dead
Printed: 2/21/2006 10:57:46 AM
gP Page 7 of 23
Operations Summary Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
1/16/2006 15:00 - 16:00 1.00 DRILL P PROD1 crude ~ 2.5 bpm, ICP - 800 psi, FCP - 1,000 psi, SIP - 960
psi.
16:00 - 19:00 3.00 DRILL P PROD1 RIH with BHA #4 picking up drill pipe 1 X 1 to 2,450'. Set down
firm on obstruction in casing at 2,450'.
19:00 - 20:00 1.00 DRILL N DPRB PROD1 Circulate air out of lines, rig up and test 7 5/8" casing 3,500 psi
- 10 minutes - OK.
20:00 - 20:30 0.50 DRILL N DPRB PRODi Attempt to work past obstruction without pumping by orienting
pipe in 90 deg increments and setting down without success.
20:30 - 22:00 1.50 DRILL N DPRB PROD1 POH with BHA #4 from 2,450' to 328'.
22:00 -00:00 2.00 DRILL N DPRB PROD1 PJSM on BHA and nuclear source. Stand back 6.75"
directional drilling assembly. (BHA #4). Break bit and laydown
motor.
1/17/2006 00:00 - 01:00 1.00 DRILL N DPRB PROD1 Pick up and make up 6 1/8" fiat bottom mill, 6.75" string mill,
bumper sub, oil jars.
01:00 - 02:00 1.00 DRILL N DPRB PROD1 RIH with milling assembly to 2,400'.
02:00 - 02:45 0.75 DRILL N DPRB PROD1 Fill pipe and wash down to 2,450 without rotating. 130 gpm,
100 psi. PU - 82k, SO - 72k. Tag up on obstruction ~ 2,450'
with 10k, pick up and start rotating down with 50 rpm 2.8k TO.
Mill on obstruction briefly with weight and Torque increase
indication then fell through. Work area several times to confirm
cleanout with 100 rpms, 76k RW, 2.8k TO.
02:45 - 03:00 0.25 DRILL N DPRB PROD1 Conduct brief casing test to confirm integrity to 3,500 psi - OK.
03:00 -04:30 1.50 DRILL N DPRB PROD1 RIH from 2,450' to 4,270' (into top of BTC-M casing). No
problems.
04:30 -06:30 2.00 DRILL N DPRB PRODi Monitor well -stable. POH standing back 4" DP and HWDP
from 4,270' to 34'.
06:30 - 07:30 1.00 DRILL N DPRB PRODi LD String Mill BHA from 34'. Clear and clean the floor.
07:30 - 10:00 2.50 DRILL N DPRB PROD1 PJSM for PU BHA and Nuclear Source Tool. PU BHA#5 and
RIH on 4" DP to 2,498'. BHA #5: 6.75" DS146H+GJUW, 4.75"
AIM motor - 4R/5S - 6 stg - 1.5 bend, bypass sub w/float, nm
stab, MWD/LWD, PWD, ADN, 2 x nm Hex dc, circ sub, xo, 1 x
4" DP, jars.
10:00 - 10:30 0.50 DRILL P PROD1 Shallow test the MWD/LWD tools -good.
10:30 - 13:00 2.50 DRILL P PROD1 RIH with BHA #5 with 4" DP and HWDP to 6,790'.
13:00 - 15:00 2.00 DRILL P PROD1 MAD pass for log correlation and tie in from 6,790' to 7,135' -
295 gpm, 1,600 psi, PU - 145k, SO - 90k.
15:00 - 15:30 0.50 CASE P INTi Pressure test the 7-518' 29.7# L-80 BTC casing to 3,500 psi -
chart and hold for 30 minutes -good.
15:30 -16:30 1.00 DRILL P PROD1 Continue MAD pass for log correlation and tie in from 7,135'
and tag up on float collar at 7,208'- 295 gpm, 1,600 psi, PU -
145k, SO - 90k.
16:30 - 17:30 1.00 DRILL P PRODi Drill shoe tract from 7,208' to 7,285' - 275 gpm, 1,560 psi, 60
rpm, 7k TQ.
17:30 - 19:00 1.50 DRILL P PROD1 Displace the well over to 9.2 ppg MOBM. Pump 55 bbl
surfactant spacer followed by MOBM - 285 gpm, 2,540 psi, 60
rpm, 6k TQ.
19:00 - 19:30 0.50 DRILL P PRODi Drill out float shoe, rat hale and 22' of new formation to 7,322' -
PU - 135k, SO - 90k, 295 gpm, 2,890 psi
19:30 - 20:00 0.50 DRILL P PRODi PuII the BHA inside the 7-5/8' casing and circulate a bottoms
up - 295 gpm, 2,660 psi, 60 rpm.
20:00 -20:30 0.50 DRILL P PROD1 Perform F1T to 11.52 ppg EMW with 545 psi surface pressure
and 4,525' ND -good.
20:30 - 21:00 0.50 DRILL P PROD1 Obtain benchmark ECD's - 10.29 ppg ROT, 10.08 w/o ROT.
Printed: 2/2112006 {0:57:46 AM
gp Page 8 of 23
Operations Summary Reporf
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
1/17/2006 21:00 -00:00 3.00 DRILL P PRODi Drill 6-3/4" directionally from 7,322' to 7,415' - PU - 135k, SO -
90k, ROT - 110k, 295 gpm, 2,670 psi off, 2,910 psi on, 60 rpm,
5k TO off, 6k TO on -taking surveys every 30'. CECD - 10.28,
AECD - 10.38, ART - 0.09, AST - 0.9
1/18/2006 00:00 - 05:00 5.00 DRILL P PROD1 Drill 6-3/4' directionally from 7,415' to 7,975' - PU - 136k, SO -
81k, ROT - 105k, 290 gpm, 2,730 psi off, 3,160 psi on, 60 rpm,
5.2k TQ off, 6.2k TO on, AST - 1.6, ART - 1.6, CECD - 10.35,
AECD - 10.7 -taking surveys every 30'.
05:00 -06:00 1.00 DRILL N DFAL PROD1 Lost communication with the AIM motor. Circulate bottoms up
prior to tripping out of the hole for new AIM motor - 290 gpm,
2,730 psi. Final AECD - 10.39 ppg EMW.
06:00 - 11:30 5.50 DRILL N DFAL PROD1 Monitor well -stable. Pump dry job and POH standing back
the 4" DP and HWDP from 7,975' to BHA#5 at 234'.
11:30 - 12:30 1.00 DRILL N DFAL PROD1 PJSM for laying down the BHA and removing nuclear source.
LD BHA#5. 6-3/4" DS146 graded 0-0-WT-A-X-I-NO-DTF
12:30 - 13:00 0.50 DRILL N DFAL PROD1 Clear and clean the rig floor.
13:00 - 13:30 0.50 DRILL P PROD1 Service/lubricate the top drive and the rig.
13:30 - 14:30 1.00 DRILL N DFAL PROD1 PJSM for MU BHA #6 and handling nuclear source. MU BHA
#6 with new AIM motor, orient and load nuclear source and RIH
to 234'. BHA #6: 6.75" DS146H+GJUW-RR, 4.75" AIM motor -
4R/SS - 6 stg - 1.5 bend, bypass sub w/float, nm stab,
MWD/LWD, PWD, ADN, 2 x nm flex dc, circ sub, xo, 1 x 4" DP,
jars.
14:30 - 18:00 3.50 DRILL N DFAL PROD1 RIH with BHA #6 on 4" DP from 234' to 1,177'. Shallow test
the MWD/LWD -good. Continue RIH with 4" DP and HWDP
from 1,177' to 7,229' filling pipe at 4,021' and 7,229'.
18:00 - 19:00 1.00 DRILL P PROD1 Cut and slip 65' of drilling line.
19:00 - 19:30 0.50 DRILL N DFAL PROD1 RIH from 7,229' to 7,884'. Precautionary wash and ream down
to 7,975'.
19:30 - 00:00 4.50 DRILL P PRODi Dri116-3/4" directionally from 7,975' to 8,255' - PU - 143k, SO -
78k, ROT - 104k, 300 gpm, 2,950 psi off, 3,155 psi on, 60 rpm,
5.6k TO off, 6.2k TO on, AST - 0.45, ART - 0.8, CECD - 10.35,
RECD - 10.78 -taking surveys every 30'.
1/19/2006 00:00 - 12:00 12.00 DRILL P PROD1 Drill 6-3/4" directionally from 8,255' to 9,375' - PU - 140k, SO -
79k, ROT - 104k, 290 gpm, 2,840 psi off, 3,100 psi on, 60 rpm,
7k TQ off, 8k TO on, AST - 1.72, ART - 3.15, CECD - 10.64,
AECD - 10.73, taking surveys every 30'.
12:00 - 23:00 11.00 DRILL P PRODi Dri116-3/4' directionally from 9,375' to 10,620' - PU - 150k, SO -
74k, ROT - 106k, 290 gpm, 2,950 psi off, 3,175 psi on, 60 rpm,
8.3k TQ off, 9k TQ on, AST - 0.16, ART - 3.38, OECD - 10.7,
AECD - 10.98, taking surveys every 30'.
23:00 -00:00 1.00 DRILL P PRODi Circulate open hole volume into the casing prior to
backream/MAD pass to the previous casing shoe. Monitor the
weH -stable.
1/20!2006 00:00 -11:00 11.00 GRILL P PRODt Backream/MAD Pass to 7,320' - 290 gpm, 600 fph max, 2,980
psi, CECD -10.7, AECD - 10.79.
11:00 -11:30 0.50 DRILL P PROD1 Service the top drive and lubricate rig components.
11:30 - 13:30 2.00 DRILL P PROD1 RIH without problems from 7,320' to 10,620'.
13:30 - 14:30 1.00 DRILL P PROD1 Circulate bottoms up and displace the well over to 9.2 ppg SF
MOBM - 290 gpm, 2,800 psi.
14:30 - 17:30 3.00 DRILL P PROD1 Monitor the well -stable, POH from 10,620' to 7,291' - PU -
154k, SO - 74k.
17:30 - 18:30 1.00 DRILL P PROD1 Drop bar and open up the circ sub. Circulate a bottoms up -
Printed: 2/21/2006 10:57:46 AM
BP Page 9 of 23
Operations Summary Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
1/20/2006 17:30 - 18:30 1.00 DRILL P PROD1 392 gpm, 2,375 psi.
18:30 - 22:00 3.50 DRILL P PROD1 Monitor the well -stable. Pump a solids free dry job and POH
from 7,291' to the top of the BHA at 235'.
22:00 - 00:00 2.00 DRILL P PRODi PJSM for removing nucclear source and laying down BHA. LD
BHA #6 from 235'. Clear and clean the floor - RU to run liner.
6-3/4" DS146 RR graded: 0-1-CT-G-X-I-NO-TD.
1/21/2006 00:00 -04:30 4.50 CASE P RUNPRD PJSM for running liner. PU and RIH with 4-1/2" 12.6# L-80
BTC Slotted - IBT Solid Liner as per program. PU a total of 58
joints of slotted, 13 joints of solid liner, 2 swell packer
assemblies (4 rigid centralizers) and Weatherford Aluminum
Billet.
04:30 - 13:00 8.50 CASE P RUNPRD XO and RIH with OBc liner on 4" DP and HWDP -filling each
stand.
13:00 - 13:30 0.50 CASE P RUNPRD Tag bottom at 10,620' - PU - 160K, SO - 68K. Establish
circulation at 1 bpm and observe returns at surface. Set down
10K and bring the rate up to 3 bpm to release the "G" spear
from the aluminum billet.
13:30 - 14:00 0.50 CASE P RUNPRD POH to the 7-5/8" casing shoe at 7,289'.
14:00 - 14:30 0.50 CASE P RUNPRD Circulate bottoms up. Monitor the well -stable. Pump solids
free dry job.
14:30 - 17:30 3.00 CASE P RUNPRD POH standing back the 4" DP and HWDP from 7,289'. Break
out and LD the "G" spear. Function the rams.
17:30 - 18:30 1.00 CASE P RUNPRD Change out the quill on the top drive.
18:30 - 20:30 2.00 DRILL P PROD2 PJSM for PU BHA and loading nuclear source. MU BHA #7 to
235'. BHA #7: 6.75" DS146H+GJUW-RR, 4.75" AIM motor -
4R/5S - 6 stg - 1.5 bend, bypass sub w/float, nm stab,
MWD/LWD, PWD, ADN, 2 x nm flex dc, circ sub, xo, 1 x 4" DP,
jars.
20:30 - 21:00 0.50 DRILL P PROD2 RIH with 4" DP to 1,300'.
21:00 - 21:30 0.50 DRILL P PROD2 Shallow test the MWD/LWD - 290 gpm, 1,850 psi -good.
21:30 -00:00 2.50 DRILL P PROD2 RIH with 4" DP and HWDP to 7,230'.
1/22/2006 00:00 - 01:00 1.00 DRILL P PROD2 Service the top drive and lubricate the rig. Cut and slip drilling
line.
01:00 - 01:30 0.50 DRILL P PROD2 RIH and tag the top of the aluminum billet at 7,690'.
01:30 - 02:30 1.00 DRILL P PROD2 Pull up above the top of the billet and circulate and condition
the 9.2 ppg SF MOBM for displacement to 9.2 ppg MOBM.
02:30 -04:00 1.50 DRILL P PROD2 Displace the well over to 9.2 ppg MOBM. Work the pipe during
displacement to dig a trench to aid in the KO of the billet.
04:00 -06:00 2.00 DRILL P PROD2 Time drill off the top of the aluminum billet from 7,690' to 7,704'
06:00 - 12:00 6.00 DRILL P PROD2 Drill 6-3/4' directionally from 7,704' to 8,348' - PU - 132k, SO -
83k, ROT - 100k, 290 gpm, 2,625 psi off, 3,000 psi on, 60 rpm,
4k TQ off, 7k TO on, AST - 3.18, ART - 1.5, CECD - 10.24,
AECD - 10.6, taking surveys every 30', backreaming each
stand.
12:00 -00:00 12.00 DRILL P PROD2 Drill6-3/4' directionally from 8,348' to 9,93T- PU -149k, SO -
56k, ROT - 96k, 290 gpm, 2,910 psi off, 3,200 psi on, 60 rpm,
6.4k TO off, 7.3k TQ on, AST - 1.76, ART - 3.52, OECD -
10.63, AECD - 11.02, taking surveys every 30', backreaming
each stand.
1/23/2006 00:00 -04:15 4.25 DRILL P PROD2 Drill 6-3/4` directionally from 9,937' to 10,621' (TD) - PU - 149k,
SO - 56k, ROT - 96k, 290 gpm, 2,910 psi off, 3,200 psi on, 60
rpm, 6.4k TQ off, 7.3k TO on, taking surveys every 30',
backreaming each stand. ART = 1.74 Hrs. AST = 0.28 Hrs
Printed: 2/21/2006 10:57:46 AM
gp Page 10 of 23
Operations Surnmary;Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Date. From - To Hours 'Task Gode NPT Phase Description of operations
1/23/2006 00:00 - 04:15 4.25 ORILL P PROD2 CECD = 10.86 AECD = 11.25
04:15 - 11:00 6.75 DRILL P PROD2 Circulate OH volume into the casing. BackreamfMAD pass out
of the hole ~ 600 FPH to 8,534'. Phase 3 called for GPB.
11:00 - 00:00 13.00 DRILL N WAIT PROD2 Crew changed w/ loader (Discussed w/ HSE rep and IMT who
approved plan) Safety Mtg w/crew. POH to shoe. Shut down
operation and wait on weather.
1/24/2006 00:00 - 05:30 5.50 DRILL N WAIT PROD2 Still in Phase 3 -Operations suspended -Wait on Weather.
Crew changed w/ loader (Discussed w/ HSE rep and IMT who
approved plan ). Circulate across the top of the hole to ensure
full.
05:30 - 08:00 2.50 DRILL N WAIT PROD2 Continue to wait on weather. Conditions changed to Phase 2
on the Spine road and Phase 3 on Access roads and pads.
Get personnel and trucks back to location with convoys.
08:00 - 08:30 0.50 DRILL N WAIT PROD2 Circulate bottoms up at the 7-5/8" shoe - 285 gpm, 2,780 psi.
08:30 - 09:30 1.00 DRILL N WAIT PROD2 Orient -90 LHS and RIH from 7,230' to 8,640'.
09:30 - 12:00 2.50 DRILL P PROD2 Backream /MAD pass from 8,640' to 7,900' - 285 gpm, 2,780
psi, 60 rpm, 5k TO, <600 fph.
12:00 - 13:00 1.00 DRILL P PROD2 POH from 7,900' to 7,230' -inside the 7-5/8" casing shoe.
13:00 - 13:30 0.50 DRILL P PROD2 Service the top drive, blocks and crown.
13:30 - 15:00 1.50 DRILL P PROD2 Orient -90 LHS and RIH from 7,230' to 10,621'.
15:00 - 17:30 2.50 DRILL P PROD2 Circulate bottoms up and displace the well over to 9.2 ppg SF
MOBM - 290 gpm, 3,000 psi, 60 rpm, 5.7k TO, CECD - 10.85,
AECD - 11.07.
17:30 - 19:30 2.00 DRILL P PROD2 Monitor the well -stable. POH to 7,292' -circ sub inside the
casing shoe, leaving the bit outside.
19:30 - 20:30 1.00 DRILL P PROD2 Drop the bar and open up the circ sub. Circulate a bottoms up
at the shoe -440 gpm, 2,800 psi, PU - 135k, SO - 83k, ROT -
96k.
20:30 - 23:00 2.50 DRILL P PROD2 Monitor the well -stable. Pump solids free dry job and POH
from 7,292' to the top of BHA#7 at 235'.
23:00 -00:00 1.00 DRILL P PROD2 PJSM to LD BHA and remove nuclear source. LO BHA#7 from
235'.
1/25/2006 00:00 - 01:00 1.00 DRILL P PROD2 Continue to LD BHA#7 from 235'. 6-3/4" DS146 RR graded:
1-1-CT-A-X-I-NO-TD
01:00 - 01:30 0.50 DRILL P PROD2 Clear and clean the floor. Service the wear ring.
01:30 - 07:00 5.50 CASE P RUNPRD PJSM for running liner. RU the rig floor. PU and RIH with the
4.5` 12.6# L-80 BTC slotted/IBT solid liner per running detail.
Utilized BOL 2000 NM thread lubricant and torqued to mark
with 4,000 ttlbs.
07:00 - 13:00 6.00 CASE P RUNPRD RIH with 4.5" liner on 4" DP and HWDP to 10,621' -filling pipe
every 3,000'.
13:00 - 14:00 1.00 CASE P RUNPRD Tag bottom at 10,621'. PU - 168k, SO - 62k. PU 2' off bottom
to 10,619'. Drop and pump ball down and allow to seat.
Pressure up to 3,500 psi to set and release from the HMC
hanger. Bleed off pressure. Set ZXP packer with 50k SO.
Pressure up the back side to 2,000 psi to test the liner top
packer for 5 minutes -good. TOL - 6,907', Shoe - 10,619'.
14:00 - 15:00 1.00 CASE P RUNPRD Circulate a bottoms up - 242 gpm, 1,000 psi. Monitor the well -
stable. Pump SF dry job.
15:00 - 18:30 3.50 CASE P RUNPRD POH standing back the 4` DP and HWDP. LD the liner running
tool.
18:30 - 19:30 1.00 I30PSU P RUNPRD Pull wear ring and install test plug. RU to test BOPS.
Printed: 2/21/2006 10:57:46 AM
BP
Operations-Summary Report
Page 11 of 23
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABORS 9ES Rig Number:
Date. from -'To Hours Task Code. NPT Phase Description`of Operations
1/25/2006 19:30 - 23:00 3.50 BOPSU P
23:00 - 00:00 I 1.001 BOPSUR P
1 /26/2006 100:00 - 02:30 I 2.501 EVAL I P
02:30 - 03:30 I 1.001 EVAL I N
03:30 -04:15 0.75 EVAL N
04:15 -04:45 0.50 EVAL N
04:45 - 07:00 2.25 EVAL P
07:00 - 08:30 1.50 EVAL P
08:30 - 09:30 1.00 STWHIP P
09:30 - 12:00 I 2.501 STWHIPI P
12:00 - 12:30 I 0.501 STWHIPI P
12:30- 16:00 3.50 STWHIP P
16:00 - 16:30 0.50 STWHIP P
16:30- 18:00 I 1.501 STWHIPIP
18:00 -00:00 6.00 STWHIP P
1/27/2006 100:00 - 01:00 I 1.001 STWHIPI P
01:00 - 05:00 I 4.001 STWHIPI P
05:30 - 07:30 I 2.00 I DR LL IPI P
RUNPRD Test the BOPE, Annular Preventer, valves and equipment to
250 psi low and 3,500 high. 1 failure noted -dart valve.
Changed it out and tested successfully. Witness of the test
was done by Chuck Schieve - AOGCC, Brian Tiedemann -
NAD Rig Supervisor, and James Franks - BP Wellsite Leader.
RUNPRD RD all testing equipment. Blow down top drive and all surface
equipment. Clear and clean the floor.
INT1 PJSM. RU SLB wireline. RIH with USIT to log the cement
quality of the 7-5/8" intermediate casing from 6,907'.
DFAL ~ INT1 USIT not working properly. Trip out of the hole to troubleshoot
problem.
DFAL INT1 Troubleshoot wireline problem -burnt wire in cable head.
DFAL INT1 RIH with USIT to 6,907'
INT1 Log up with the USIT from 6,907' to 3350. Good zonal isolation.
INTi RD SLB wireline tools and equipment.
WEXIT Bring Baker Whipstock tools to the rig floor. RU to run
Whipstock.
WEXIT PU and MU Whipstock/Milling BHA for L2 to 451'. Orient
MWD. Whipstock/Milling BHA - no go sub w/seals, unloader
sub, pup, 1 x 3.5" HWDP, double pin sub, anchor, safety
disconnect sub, unloader sub, debris sub, bit sub, whipstock,
starting mill, lower string mill, flex joint, 1 x 3.5" HWDP, float
sub, MWD, bumper sub, 9 x dc's.
WEXIT RIH with whipstock on 4" HWDP and 4" DP to 1,189'. Shallow
test the MWD -good - 290 gpm, 1,065 psi.
WEXIT Continue RIH with whipstock to 6,872'.
WEXIT Orient whipstock 8 degrees LHS. Tag the liner top and set the
whipstock with 10k SO. Test the backside to 1,500 psi -good.
Shear off of the whipstock with 50k SO. TOW - 6,832', BOW -
6,844'.
WEXIT Displace the well over to 9.2 ppg MOBM with CaC03.
WEXIT Mill window from 6,832' to 6,844' and drill new formation to
6,861' -300 gpm, 2,030 psi, 120 rpm, 5k TO off, 6 k TO on.
WEXIT Circulate a hi-visc sweep surface to surface to clean up the
hole.
WEXIT POH standing back 4"DP and HWDP. LD Milling BHA. Clear
and clean the floor.
WEXIT PU circ sub and flush the stack.
PRODS PJSM for PU BHA and loading nuclear source. MU L2 6-3/4"
BHA#9 to 234' - 6.75" DS146H+GJUW-RR8, 4.75" AIM motor -
4R/5S - 6 stg - 1.5 bend, bypass sub w/float, nm stab,
MWD/LWD, PWD, ADN, 2 x nm flex dc, circ sub, xo, 1x.4" DP,
07:30 - 10:30 3.00 DRILL P PRODS RIH with 4" DP to 1,271'. Shallow test the MWD, 290 gpm,
1,590 psi -good. Continue RIH with BHA#9 on 4' DP and
HWDP to 6,772' -filling pipe every 3,000'.
10:30 - 12:00 1.50 DRILL P PRODS Cut and slip drilling line. Service the top drive, blocks and
crown.
12:00 - 13:30 1.50 DRILL P PRODS Circulate bottoms up and obtain baseline ECD values - 290
gpm, 2,280 psi, 60 rpm, CECD - 10.18.
13:30 - 14:00 0.50 DRILL P PRODS Orient the toolface and RIH through the window to 6,861'.
14:00 - 15:30 1.50 DRILL P PRODS Drill 6-3/4" ahead directionally from 6,861' to 7,041' - PU -
125k, SO - 90k, ROT - 100k, TO - 5k, 2540 psi on, 2280 psi off,
P~~rned: v2~noos ~asras a~n
BP Page 12 of 23
Operations Summary Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Date From- To Hours Task Code NPT Phase Description of Operations
1/27/2006 14:00 - 15:30 1.50 DRILL P PROD3 AST - 1.02, CECD - 10.18, AECD - 10.3. AIM not working, but
try to troubleshoot while drilling to 7,041' -unsuccessful. MW
in - 9.2, MW out - 9.2.
15:30 - 19:00 3.50 DRILL N DFAL PROD3 Monitor the well -stable. Pump dry job and POH from 7,041' to
the top of BHA#9 at 234'.
19:00 - 20:30 1.50 DRILL N DFAL PROD3 PJSM to LD BHA#9 and remove the nuclear source. Handle
BHA#9 at surface. LD MWD and AIM motor. Clear and clean
the floor. 6-3/4" DS146 RR8 graded: 1-1-CT-A-X-I-NO-DTF
20:30 - 21:30 1.00 DRILL N DFAL PROD3 PJSM for PU BHA and loading nuclear source. MU L2 6-314"
BHA#10 to 234' with new AIM motor and MWD. BHA#10:
6.75" DS146H+GJUW-RR9, 4.75" AIM motor - 4R/5S - 6 stg -
1.5 bend, bypass sub w/float, nm stab, MWD/LW D, PW D,
ADN, 2 x nm flex dc, circ sub, xo, 1 x 4" DP, jars.
21:30 - 00:00 2.50 DRILL N DFAL PROD3 RIH with 4" DP to 1,177'. Shallow test the MWD, 290 gpm,
1,590 psi -good. Continue RIH with BHA#10 on 4" OP and
HWDP to 4,020' -filling pipe every 3,000'.
1/28/2006 00:00 - 01:30 1.50 DRILL N DFAL PROD3 Continue RIH with BHA#10 on 4" DP and HWDP from 4,020'.
Orient the tool face and slide through the window. RIH to
7,041' -filling pipe every 3,000'.
01:30 - 12:00 10.50 DRILL P PROD3 Drill 6-3/4" ahead directionally from 7,041' to 8,068' - PU -
138k, SO - 73k, ROT - 98k, 290 gpm, TO on - 5.5k, TO off
5.5k, 2,750 psi on, 2,600 psi off, CECD - 10.45, AECD - 10.95,
AST - 2.15, ART - 2.13 -taking 30' surveys and backreaming
each stand.
12:00 -00:00 12.00 DRILL P PROD3 Dri116-3/4" ahead directionally from 8,068' to 9,466' - PU -
145k, SO - 63k, ROT - 95k, 290 gpm, TQ on - 7k, TO off - 6.5k,
2,950 psi on, 2,750 psi off, CECD -10.68, AECD - 11.2, AST -
2.91,ART - 2.75 -taking 30' surveys and backreaming each
stand.
1/29/2006 00:00 - 09:00 9.00 DRILL P PROD3 Drill 6-3/4" ahead directionally from 9,466' to 10,605' (TO) - PU
- 147k, SO - 60k, ROT - 97k, 290 gpm, TQ on - 8k, TQ off - 7k,
3,160 psi on, 2,980 psi off, AST - 1.97, ART - 2.53, CECD -
10.8, AECD - 11.3, taking 30' surveys and backreaming each
stand.
09:00 -22:00 13.00 DRILL P PROD3 Circulate up surveys and prepare to MAD pass to the window.
MAD Pass / Backream from 10,605' to 6,945' -600 fph max,
270 gpm, 60 rpm, 2,980 psi, 7k TO. Orient the BHA to 15 LHS
and pull through the window into the 7-5/8' intermediate casing
to 6,761'.
22:00 - 22:30 0.50 DRILL P PROD3 Service the top drive, blocks and the crown.
22:30 -00:00 1.50 DRILL P PROD3 RIH from 6,761' to 7,970'.
1/30/2006 00:00 - 01:00 1.00 DRILL P PROD3 Continue RIH from 7,970' to 10,605'.
01:00 - 02:30 1.50 DRILL P PROD3 Circulate a bottoms up to ensure hole clean. Displace the well
over to 9.2 ppg SF MOBM - 290 gpm, 2900 psi.
02:30 -04:30 2.00 DRILL P PROD3 POH from 10,605' to 7,134'.
04:30 -06:00 1.50 DRILL P PROD3 Orient the motor to -20 LHS. Drop the bar and open the circ
sub. Wash across the face of the whipstock without rotary
through the circ sub. Pull up above the whipstock to 6,761' and
circulate a bottoms up - 290 gpm, 1,150 psi. Monitor the well -
stable. Pump SF dry job.
06:00 -09:00 3.00 DRILL P PROD3 POH standing back the 4" DP and HWDP to the top of the BHA
at 234'.
09:00 - 10:30 1.50 DRILL P PROD3 PJSM to LD BHA#10 and remove the nuclear source. Handle
Printed: 2/21/2006 10:57:46 AM
g p Page 13 of 23
Operations Summary Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Mours Task Code NPT' Phase Description of Operations
1/30/2006 09:00 - 10:30 1.50 DRILL P PROD3 BHA#10 at surface. 6-3/4" DS146 RR9 graded:
1-2-CT-G-X-I-NO-TD
10:30 - 12:00 1.50 DRILL P PROD3 Clean and clear the floor. Bring Whipstock retrieval tools to the
floor. Hold PJSM with crew coming on tour on MU BHA #11
12:00 - 15:00 3.00 WHIP P RUNPRD PU Whipstock retrieval BHA #11. Orient hook with MWD, PU
4.75" dc's and RIH to 377'. Test MWD -good. Continue to
RIH to retrieve whipstock from 377' to 6,812' with 4" HWDP
and DP from the derrick. BHA#11: Hook, 1 x 3.5" HWDP, float
sub, MWD, bumper sub, jars, 9 x 4.75" dc's, xo
15:00 - 15:30 0.50 WHIP P RUNPRD Orient the hook to 15 LHS - PU - 130k, SO - 90k. RIH to
6,836', hook whipstock and SO 10k. PU to 150k and allow the
jars to bleed off. PU to 170k and the whipstock pulled free.
POH to 6,821'.
15:30 - 16:30 1.00 WHIP P RUNPRD Circulate bottoms up - 200 gpm, 830 psi.
16:30 - 20:30 4.00 WHIP P RUNPRD POH standing back the 4" DP and HWDP as well as the 4.75"
DC's.
20:30 - 21:00 0.50 WHIP P RUNPRD LD the Whipstock and associated tools down to the safety
disconnect. Left in the hole -safety disconnect w/ 3.5" fishing
neck, anchor, double pin sub, 1 x 3.5" hwdp, pup, unloader
sub, and nogo sub w/seals.
21:00 - 22:30 1.50 WHIP N DFAL RUNPRD MU Overshot BHA#12 and RIH - oveshot with 3.5" grapple,
bumper sub, jars, float sub. R1H with 9 x 4.75" DC's from the
derrick.
22:30 - 00:00 1.50 WHIP N DFAL RUNPRD RIH with Overshot BHA#12 to 3,134' on 4" DP and HWDP from
the derrick.
1/31/2006 00:00 - 01:30 1.50 WHIP N DFAL RUNPRD Continue RIH with Overshot BHA from 3,134' to 6,821' on 4"
DP and HWDP from the derrick.
01:30 - 02:30 1.00 WHIP P RUNPRD Cut and slip drilling line. Service the top drive, blocks and
crown.
02:30 - 03:00 0.50 WHIP N DFAL RUNPRD Engage and wash over the fish at 6,860' - PU - 125k, SO - 80k.
SO 5k, then PU to 175k and let the jars fire -not free. SO
and set the jars. PU to 180k and fire the jars -not free. Set
the jars, then PU to 190k and fire the jars -not free. Set the
jars, then PU to 205k and fire the jars -free.
03:00 -04:00 1.00 WHIP N DFAL RUNPRD Circulate a bottoms up - 200 gpm, 2,000 psi.
04:00 - 08:30 4.50 WHIP N DFAL RUNPRD POH, standing back the 4' DP, HWDP and 4.75' DC's, with the
remaining sections of the Whipstock Setting BHA.
08:30 - 10:00 1.50 WHIP N DFAL RUNPRD Lay down fishing assembly and fish.
Recovered: safety disconnect, Anchor, ported bit sub, 1 jt.
hwdp, spacer sub, unloader, no go, liner top seal assembly.
Clear floor of all excess vendors equipment.
10:00 - 18:30 8.50 CASE P RUNPRD P/U casing equipment and all needed jewelry to run slotted
liner in Lat # 2 wellbore. P/U solid bent joint with shoe, cross
over, 92 joints of 4 1/2, L80 12.5 # BTC slotted liner, X0, swell
packer assembly, XO and Hook wall hanger assembly.
RIH w/ 4' DP to 6,800'.
18:30 - 19:00 0.50 CASE P RUNPRD M/ U Top Drive and Established Parameters, Up Wt 110K, Dn
Wt 77K, Rty Wt 95K, Rotary 10 rpm at 3,000 ffnbs torque,
Pump 3 bpm at 220 psi. RIH to 6,854' (10' past btm of window)
P/U to 6,838', rotated 6 turns to right, let out string torque, got
1/2 tum back. Slacked off and exited window from 6,832' to
6,844'.
19:00 - 21:30 2.50 CASE P RUNPRD RIH w/ L2 4-1/2" Slotted Liner on 4" DP (utilising 4' HWDP and
Printed: ?121/2006 10:57:48 AM
gp Page 14 of 23
Operations Summary Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours -'Task 'Code NPT Phase Description of Operations
1/31/2006 19:00 - 21:30 2.50 CASE P RUNPRD 4-3/4" DG for weight) to 10,597' 4-112" Shoe Depth. Up Wt
154K, Dn Wt 75K
21:30 - 22:00 0.50 CASE P RUNPRD P/U to 6,822' HooK Depth, Apply 1-1/2 turns to right, held
torque in place. S/O and latched Hook at 6,827' w/ 35K Dn Wt.
P/U to free point, S/O and rehookd to verify. P/U to 6,882 and
applied 1-1/2 turns to right, S/O to 6,834' to verify Hook
unlatched. P/U to 6,822', and 3/4 turn to right, S/O and rehook
w/ 35K Dn Wt. P/U and rehooked to verify hooked depth of
6,827'. 4-1/2" Shoe Depth 10,590'
22:00 - 22:30 0.50 CASE P RUNPRD B/O Top Drive and drop 29/32" ball and pump on seat at 3
bpm, 630 psi. Pressure up to 3,100 psi to release HR setting
tool. P/U string with 125K Up Wt to verify toot released.
Pressure up to 4,200 to shear the ball seat. POH w/ running
tool to 6,775'.
22:30 - 00:00 1.50 CASE P RUNPRD Circulated B/U with 9.2 ppg mud at 209 gpm, 752 psi.
Monitored Well-Static, Pumped Dry Job, Blew Dn Top Drive.
Up Wt 128K, Dn Wt 73K.
2/1/2006 00:00 - 03:00 3.00 CASE P RUNPRD POH w/ HR Setting Tool, Standing Back in derrick HWDP and
DC to be reused for the LEM #1 Run
03:00 - 03:30 0.50 CASE P RUNPRD Make service breaks on HR Setting Tool and L/D same
03:30 -04:00 0.50 CASE P RUNPRD Clear and clean rig floor, P/U LEM Running Equipment
04:00 -04:30 0.50 CASE P RUNPRD R/U Power tongs and C/O Elevators to 4-1/2"
04:30 - 05:30 1.00 CASE P RUNPRD Held PJSM, P/U Non Locating Seal Assy, 1 ea. 4.5" 12.6# L-80
XO joint, 1 Jt 4.5" 12.6# L-80 IBT, 1 ea 4.5" 12.6# L-80 IBT pup
jt, LEM Hanger, 1 ea 4.5" 12.6# L-80 i8T-M pup jt, Casing
Swivel, 5-1/2" HYD 563 x 4-1/2" IBT XO Bushing, Baker 190-47
Seal Bore Extension., Baker ZXP Liner top Packer.
05:30 - 06:30 1.00 CASE P RUNPRD R/U 2-7/8" false bowl on top of SBR. C/O Elevators. PU 5 jts
2-38" inner string.
06:30 - 11:00 4.50 CASE P RUNPRD RIH with LEM #1 on 4' drill pipe from 187' to 6,837' ~ 60 fpm.
11:00 - 12:00 1.00 CASE P RUNPRD Set down ~ 6,837'. Pick up and rotate string 3/4 turn and work
non-locating seal assembly through hook hanger assembly.
PU - 137k, SO - 85k.
12:00 - 13:00 1.00 CASE P RUNPRD Make up topdrive and wash down to 6,945'. Set LEM in hook
hanger and engage same with 30k down weight. Pick up 15k
over string weight verifying LEM engagement. Drop 1.75" ball
and circulate ball down ~ 4 bpm, 750 psi. Decrease rate to 2
bpm prior to ball seat. Pressure up to 2800 psi, wait 1 minute
and set ZXP packer with 4,000 psi. Release liner running tool
from packer. Test ZXP liner top packer to 1,500 psi - 5
minutes - OK. Pick up string above LEM, pump dry job. Blow
down kill line and top drive.
Top of liner ~ 6,769.52
13:00 - 16:00 3.00 CASE P RUNPRD POH from 6,769' to 197'.
16:00 - 17:30 1.50 CASE P RUNPRD Lay down liner running tools and 2-7/8' inner string. Clear
floor.
17:30 - 18:30 1.00 WHIP P WEXIT Pick up Whipstock tools to rig floor, steam same.
18:30 - 19:30 1.00 WHIP P WEXIT Make up Whipstock assembly #2. Orient MWD and
Whipstock.
19:30 - 20:30 1.00 WHIP P WEXIT RIH with drill collars and HWDP to 1,340'. Test MWD - OK.
20:30 - 23:30 ~ 3.00 WHIP P WEXIT Continue RIH with Whipstock #2 on 4" drill pipe from 1,340' to
6,662'
Printed: 2/21/2006 10:57:46 AM
..~.
BP
Operations Summary Report
Legal Well Name: V-203
Common Well Name: V-203
Event Name: DRILL+COMPLETE Start: 1/6/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Page 15 of 23
Spud Date: 1/8/2006
End: 2/16/2006
Date From - To Hours Task Gode NPT Phase Description of Operations
2/1/2006 23:30 - 00:00 0.50 WHIP P WEXIT Orient Whipstock to 10 deg left of high side.
2/2/2006 00:00 - 00:30 0.50 WHIP P WEXIT RIH from 6,669' to top of liner ~ 6,769'. PU - 137k, SO - 85k.
Set 15k down and set anchor. Pick up to 18k over string
weight to verify anchor set. Set down 35k to shear lug.
Pressure test backside to 1,500 psi - 5 min - OK.
Top of window 6,732', bottom of window 6,744'.
00:30 - 01:30 1.00 WHIP P WEXIT Displace well from 9.2 ppg SFMOBM to 9.2 ppg MOBM ~ 300
9Pm, 2,120 psi.
01:30 -04:30 3.00 STWHIP P WEXIT Mill window from 6,732' to 6,744'. 350 gpm 2,690 psi, 50 rpm,
5-7k TO.
04:30 - 07:00 2.50 STWHIP P WEXIT Drill L3 new hole from 6,744' to 6,761'. 350 gpm, 2,690 psi, 50
rpm, 4-5k TO, 3-5k WOB.
07:00 - 09:00 2.00 STWHIP P WEXIT Ream and wipe window clean. 1st attempt pulled 15k over at
6,739'. Pull up free to 6,725'. Go back down to 6,740' taking
35k. Pick up and ream window ~ 280 gpm, 1,920 psi, 75 rpm,
5.2k TO. Work through window without rotating with same
results as 1st attempt. Time ream window from 6,739' to
6,759' ~ 290 gpm 1,920 psi, 75 rpm, 5.2k TO. Wipe window -
OK.
09:00 - 10:30 1.50 STWHIP P WEXIT Pump 50 bbl 11.2 ppg safe carb weighted high-vis sweep
surface to surface. 280 gpm, 1,950 psi. Monitor well - OK.
MW - 9.2 PP9•
10:30 - 13:00 2.50 STWHIP P WEXIT POH with window milling assembly from 6,713' to 175'.
13:00 - 14:30 1.50 STWHIP P WEXIT Lay down window milling assembly, lay down tools from rig
floor.
14:30 - 15:00 0.50 STWHIP P WEXIT Clean MOBM off of rig floor.
15:00 - 16:00 1.00 STWHIP P WEXIT Make up BOP stack cleaning tools. Flush BOPE. Blow down
surface equipment.
16:00 - 16:30 0.50 STWHIP P WEXIT Service rig and topdrive. Adjust disc brake, inspect brake
linkage.
16:30 - 18:00 1.50 DRILL P WEXIT Hold PJSM on nuclear source. Pick up directional drilling BHA
#14: Bit - 1.5 deg PDM AIM -bypass - NMSTB - MWO/LWD -
ADN. Load nuclear source. Continue picking up BHA:
NMFLEX DC's - circ sub - XO - 1 jt DP -Jar = 234'.
'PWD not run due to damaged tool face. No backup available.
18:00 - 21:00 3.00 DRILL P WEXIT RIH from 234' to 1,164'. Test MWD - OK. RIH from 1,164' to
6,651.
21:00 - 22:00 1.00 DRILL P WEXIT Cut and slip drilling line 65'. Inspect brakes.
22:00 - 23:00 1.00 DRILL P WEXIT Establish slow pump rates. Orient 15 degrees left of high side.
RIH 1 stand through window without problem to 6,761'.
23:00 -00:00 1.00 DRILL P PROD4 Directional drill from 6,761' to 6,805'. GPM - 290, PSI ON -
2,425, PSI OFF - 2,320, RPM - 0, PU - 134k, SO - 85k. AST -
.39 hrs.
00:00 -00:00 24.00 DRILL P PROD4 Directional drill OBa L3 with BHA #14 from 6,805' to 8,743'.
GPM - 290, PSI ON - 2,750, PSI OFF - 2,620, RPM - 60, TQ
ON - 7k, TQ OFF - 6.8k, PU - 130k, SO - 74k, ROT - 99k,
WOB - 5-15k. AST - 10.35 hrs, ART - 2.65 hrs. Backream
each stand, survey every 30'.
00:00 - 16:30 16.50 DRILL P PROD4 Directional drill OBa L3 with BHA #14 from 8,743' to TD ~
10,585' MD, 4,410' TVD. GPM -290, PSI ON - 3,000, PSI OFF
- 2,810, RPM - 60, TO ON - 7.8k, TO OFF - 6.4k, PU - 129k,
SO - 72k, ROT - 96k, WOB - 10-15k. AST - 4.1.9 hrs, ART -
Printed: 2/27!2006 10:57:46 AM
BP Page 16 of 23
Operations Summary Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABORS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
2/4/2006 00:00 - 16:30 16.50 DRILL P PROD4 4.22 hrs. Backream each stand, survey every 30'.
16:30 - 17:00 0:50 DRILL P PROD4 Circulate 1 open hole volume Cd1 300 gpm, 3,000 psi. Monitor
well - OK. 9.2 ppg mud weight.
17:00 - 00:00 7.00 DRILL P PROD4 MadPass log from 10,595' to 8,611'. 600 fph, 300 gpm, 2,850
psi, 60 rpm, 6-7k TO.
2/5/2006 00:00 - 05:30 5.50 DRILL P PROD4 Continue MadPass log from 8,611' to 6,837'. 600 fph, 300
gpm, 2,850 psi, 60 rpm, 6-7k TQ. Pull up from 6,839' to 6,725'
(above window) without rotating. PU - 135k, SO - 90k ~
window. Monitor well - OK.
05:30 -06:00 0.50 DRILL P PROD4 Service Topdrive.
06:00 - 08:00 2.00 DRILL P PROD4 RIH from 6,725' to 10,585'. Washed last stand down.
08:00 - 09:00 1.00 DRILL P PROD4 Circulate bottoms up ~ 300 gpm, 2,960 psi, 60 rpm, 7k tq,
100k RW.
09:00 - 10:00 1.00 DRILL P PROD4 Displace well from 9.2 ppg LSMOBM to 9.2 ppg SFMOBM ~
300 gpm, 2,960 psi, 60 rpm, 7k tq, 100k RW.
10:00 - 13:00 3.00 DRILL P PROD4 Monitor well - OK. POH from 10,585' to 6,646'. PU - 150k, SO
- 80k. Obtain PU / SO weights every 1,000'.
13:00 - 14:00 1.00 DRILL P PROD4 Monitor well - OK. Drop 1-7/8" ball, shear out circ sub ~ 2,360
psi. Circulate bottoms up t~ 330 gpm, 2,430 psi, 60 rpm, 6k
tq. Pump dry job.
14:00 - 16:00 2.00 DRILL P PROD4 POH from 6,646' to 313'.
16:00 - 17:30 1.50 DRILL P PROD4 PJSM on nuclear source. Lay down BHA #14. Change out
circ sub, stand back DC's. Lay down MWD, motor and bit. Bit
#RR10 grade: O-O-WT-A, X-I-NO-TD
17:30 - 18:00 0.50 DRILL P RUNPRD Clear and clean rig floor. Pick up Baker tools to rig floor.
18:00 - 18:30 0.50 WHIP P RUNPRD Make up Baker Whipstock retreival tools per Baker rep.
18:30 - 19:30 1.00 W H1P P RUNPRD Pick up 9 4-3J4" DC's from pipe shed from 99' to 378'.
19:30 - 20:00 0.50 WHIP P RUNPRD RIH with whipstock fishing assembly on 4" HWDP from 378' to
1,037'. Shallow hole test MWD - OK. 290 gpm, 950 psi.
20:00 - 22:00 2.00 WHIP P RUNPRD RIH on 4' drill pipe from 1,037' to 6,620'. Fill pipe and break
circulation ~ 4,068'.
22:00 - 23:00 1.00 WHIP N DPRB RUNPRD Attempt to break circulation without success by pressuring up
and bleeding off, back and forth and by shaking drill string.
Drill string plugged. Checked surface equipment - OK.
23:00 -00:00 1.00 WHIP N DPRB RUNPRD POH with wet siring from 6,620' to 6,047'. 'Slow due to air
breaking out of drill string.
2/6/2006 00:00 -03:00 3.00 WHIP N DPRB RUNPRD Continue POH wet from 6,047' to 99' with plugged whipstock
fishing assembly. Slow due to air breaking out of drill string up
until 3,050'
03:00 -04:00 1.00 WHIP N DPRB RUNPRD Lay down fishing assembly looking for obstruction. The
circulating port in the retriever hook assembly was plugged.
Obstruction was shiny metal shavings that filled approximately
1J4 of a 5 gal bucket from the retriever hook assembly up into
the joint of 3-112" HWDP about 6 feet. The float valve was
missing one of the exterior seals. (not recovered) Clean out
retriever hook assembly and joint of HWDP. Rabbit joint - OK.
04:00 -04:30 0.50 WHIP N DPRB RUNPRD Gear MOBM from rig floor.
04:30 - 05:00 0.50 WHIP N DPRB RUNPRD Make up Baker fishing assembly, change out MWD and orient
same. RIH with 3 stands DC's to 376'.
05:00 -06:00 i.00 WHIP N DPRB RUNPRD RIH with fishing assembly on drill pipe from 376' to 1,035'.
06:00 -06:30 0.50 WHIP N DPRB RUNPRD Shallow hole test MWD. 300 gpm, 960 psi - OK.
06:30 -09:30 3.00 WHIP N DPRB RUNPRD Continue RIH from 1,035' to 6,237'. Fill pipe and break
circulation starling ~ 4,067' and continue every 5 stands.
Printed: 2/21/2006 10:57:46 AM
BP
Legal Well Name: V-203
Common Well Name: V-203
Event Name: DRILL+COMPLETE
Contractor Name: NABORS ALASKA DRILLING I
Rig Name: NABORS 9ES
Start: 1/6/2006
Rig Release: 2116!2006
Rig Number:
Page 17 of 23
Spud Date: 1 /812006
End: 2/16!2006
Date Frorn = To Hours Task Code NPT Phase Description' of Operations
2/6/2006 09:30 - 10:30 1.00 WHIP N DPRB RUNPRD Cut and slip drilling line 79'.
10:30 - 11:00 0.50 WHIP N DPRB RUNPRD Continue RIH from 6,237' to 6,600' breaking circulation every
stand. Orient 10 deg left of high side. PU - 130k, SO - 80k
(pumps on)
11:00 - 12:00 1.00 WHIP P RUNPRD Shut down pumps. PU - 135k, SO - 90k. Latch up on
whipstock on depth ~ 6,734'. Pick up 20k over. Slack back
down 5k to verify in slot. Pull 85k over string weight to release
trip anchor. Pick up to 6,716' to clear dummy seals from L2
liner top.
12:00 - 13:00 1.00 WHIP P RUNPRD Circulate bottoms up ~ 255 gpm, 1,425 psi. Lost 13 bbls
initially, lost 17 bbls total. Monitor well -static. 9.2 ppg MW.
13:00 - 16:00 3.00 WHIP P RUNPRD POH with L3 whipstock form 6,716' to 377'. PU - 140k.
16:00 - 17:30 1.50 WHIP P RUNPRD Stand back DC's and laydown fishing assembly and fish.
Recovered a0 of fish.
17:30 - 18:00 0.50 WHIP P RUNPRD Clean and clear rig floor. Lay down vendor tools.
18:00 - 19:00 1.00 CASE P RUNPRD Rig up to run L3 slotted liner.
19:00 - 00:00 5.00 CASE P RUNPRD Pick up, make up and RIH with 4.5" 12.6# L-80 BTC slotted
liner assembly as per running detail. Made up BTC joints to
3,800 fUlbs and IBT joints to 3,000 fUlbs using BOL 2000 NM.
Liner weight - PU - 73k, SO - 63k.
Ran total of:
1 bent solid xo joint with float shoe,
78 joints 4.5" 12.6# L-80 BTC slotted liner,
Swell packer,
9 joints 4.5" 12.6# L-80 IBT solid liner,
Swell packer,
Hook hanger assembly
4 4.5" 12.6# L-80 IBT space out pups.
3,855'
2/7!2006 ~ 00:00 - 05:30 I 5.501 CASE I P
05:30 - 06:00 I 0.501 CASE 1 P
Operations Surnrnary Report
RUNPRD Continue RIH with L3 slotted liner assembly on 4' drill pipe, 3
stands 4-3/4" drill collars, 8 stands 4' HWDP from 3,857' to
10,445' ~ 60 fpm. Worked through window ~ 6,732' and had
success on 4th try. PU - 110k, SO - 75k ~ window.
RUNPRD Hang L3 finer ~ 6,744'. PU - 150k, SO - 75k. Ran in hole 8'
past hanger hook to total depth of 10,584'. Pick up above
hanger hook, tum pipe 1/4 tum and land hanger ®6,744'.
Pick up, slack off to verify hanger set. Pick up above hook,
tum pipe 180 deg. Slack off and RIH 8' past hanger hook.
Pick up and tum pipe 180 deg, slack back down and re-hang
liner with 35k. Pick up, slack off to verify hook. Drop 29/32"
ball and pump down to seat same. Pressure up to 2,500 psi to
release HR setting tool, hold 1 minute, pressure up to 4,400 psi
to shear ball seat. Pick up 50' to 6,690'. PU - i35k. Shoe
Printed: 2/21/2006 70:57:46 AM
BP Page 1$ of 23
Operations Summary Report
Legal Wel(Name: V-203
Common Well Name: V-203 Spud Date: 1/8!2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16!2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
2R/2006 05:30 - 06:00 0.50 CASE P RUNPRD depth - 10,576'
Tops:
' Float shoe, PBTMD - 10,575'
1 bent solid xo joint - 10,534'
78 joints 4.5" 12.6# L-80 BTC slotted liner - 7,246'
Swell packer - 7,211' to 7,222'
9 joints 4.5° 12.6# L-801ST solid liner - 6,810'
Swell packer - 6,785' to 6,796'
Hook hanger assembly - 6,727'
06:00 - 07:00 1.00 CASE P RUNPRD Circulate bottoms up ~ 295 gpm, 1,460 psi. 9.2 ppg MW.
07:00 - 12:00 5.00 CASE P RUNPRD Monitor well - OK. POH from 6,690' to surface. PU - 135k, SO
- 90k. Lay down liner running toot.
12:00 - 12:30 0.50 CASE P RUNPRD. Clean and clear rig floor.
12:30 - 13:00 0.50 CASE P RUNPRD Rig up to run LEM #2.
13:00 - 13:30 0.50 CASE P RUNPRD Service topdrive and crown.
13:30 - 15:30 2.00 CASE P RUNPRD Held PJSM, P/U Non Locating Seal Assy, 1 ea. 4.5" 12.6# L-80
XO joint, 1 ea 4.5" 12.6# L-80 IBT pup jt, LEM Hanger, 1 ea
4.5" 12.6# L-80 IBT-M pup jt, Casing Swivel, 5-1/2" HYD 563 x
4-1/2" IBT XO Bushing, Baker 190-47 Seal Bore Extension,
Baker ZXP Liner top Packer.
15:30 - 16:00 0.50 CASE P RUNPRD Rig down Nabors Casing Service
f 6:00 - 20:30 4.50 CASE P RUNPRD RIH with LEM #2 on 4" drill pipe, 3 stands 4-3/4" drill collars, 8
stands 4" HWDP from 141' to 6,663'. PU - 138k, SO - 88k.
20:30 - 22:00 1.50 CASE P RUNPRD Wash down from 6,663' with seal assembly through top of LEM
#1 on depth to 11' inside of Seal Bore Extension with hanger ~
6,727'. Up weight in tie back - 155k. Pick up to 170k to verify
hook, stack of to 105k.
22:00 -22:30 0.50 CASE P RUNPRD Drop 1-314" ball-and pump down to seat same. Stage up pump
and pressure up to 4,000 psi to set packer and release packer
running toot. Bleed off pressure. Test packer to 1,500 psi - 5
min - OK.
Top of LEM #2 ~ 6,671'.
22:30 - 23:30 1.00 CASE P RUNPRD Pick up drill string to clear inner string out of liner top to 6,659'.
Monitor well - OK. Blow down surface lines, pump dry job for
POH. 9.2 ppg MW. PU - 130k.
23:30 - 00:00 0.50 CASE P RUNPRD POH from 6,659' to 5,800' with LEM running tool.
2/8/2006 00:00 - 03:00 3.00 CASE P RUNPRD Continue POH from 5800' to 125'
03:00 - 03:30 0.50 CASE RUNPRD Lay down LEM running tool, lay down 2-3/8" inner string.
03:30 -04:00 0.50 CASE P RUNPRD Clean and clear rig floor of vendor and liner running equipment.
04:00 -05:00 1.00 80PSU P WEXIT Pull wear bushing, set BOP test plug. Rig up to test BOPS.
05:00 - 09:00 4.00 BOPSU P WEXIT Test BOPE and surface equipment per skate requirements.
Witnessing of test waived by AOGCC rep. John Crisp. Test
witnessed by BP WSL's R. French, L. Vaughan and NAD TP's
B. Tiedemann, B. Bixby.
09:00 - 10:00 1.00 BOPSU P WEXIT Rig down BOP test equipment, blow down surface lines. Install
wear bushing.
10:00 - 10:30 0.50 WHIP P WEXIT Pick up Whipstock toots to rig floor.
10:30 - 12:30 2.00 WHIP P WEXIT Make up Whipstock - Mitl assembly per Baker rep to 501'
12:30 - 15:30 3.00 WHIP P WEXIT RIH with BHA on 4" drill pipe from 501' to 6,553' ~ 60 fpm.
Shallow hole tested MWD ~ 1,154' - OK.
Printed: 2/21/2006 70:57:46 AM
.~
gp Page 19 of 23-
Operat-ions Summary Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1!6!2006 End: 2/16/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/16!2006
Rig Name: NABORS 9ES Rig Number:
Date ~ From - To Hours Task Code ~ NFT Phase_ Description of Operations
2(8!2006 15:30 - 16:00 0.50 WHIP P WEXIT Orient 10 deg left of high side. 250 gpm, 1830 psi. PU - 138k,
SO - 90k.
16:00 - 18:00 2.00 WHIP P WEXIT RIH and tag LEM #2 liner top on depth @ 6,671'. Set down
20k to set anchor, pick up 10k over to verify anchor. Set down
35k to shear whipstock mills. Pick up to displace well. PU -
140k.
18:00 - 19:00 1.00 WHIP P WEXIT Displace well from 9.2 ppg SFMOBM to 9.2 ppg ppg LSMOBM
~ 260 gpm, 1,520 psi.
19:00 - 00:00 5.00 STWHIP P WEXIT Sidetrack L4 window by milling from 6,548' to 6,560'. 300 gpm,
2,030 psi, 90 rpm, 4.9k TO. WOB - 3-5k.
*Top of L4 window C~3 6,548'
Bottom of window ~ 6,560'.
2/9!2006 00:00 - 01:30 1.50 STWHIP P WEXIT Drill new hole from 6,560' to 6,577' with whipstock milling
assembly. 290 gpm, 1,970 psi, 90 rpm, 4.5k TO, 5k WOB.
01:30 - 02:00 0.50 STWHIP P WEXIT Pick up and work window several times by rotating up and
down throughwindow. 1st 2 attempts pulled 35k coming back
up. Work until no drag present in window. PU - 125k, SO -
90k without pump.
02:00 - 03:00 1.00 STWHIP P WEXIT Circulate high viscosity /weighted sweep surface to surface ~
290 gpm, 1,960 psi, Continue work pipe through window while
circulating sweep with no problems. No extra cuttings returned
with sweep.
03:00 - 05:30 2.50 STWHIP P WEXIT POH from 6,577' to 307'
05:30 - 06:30 1.00 STWHIP P WEXIT Laydown 4-3/4" drill collars and whipstock mills. Both mills "in
gauge".
06:30 - 07:30 1.00 STWHIP P WEXIT Clean and clear rig floor of vendor tools.
07:30 - 08:30 1.00 BOPSU P WEXIT Make up BOP stack cleanout sub and flush BOP's. Bfowdown
choke and kill lines.
08:30 - 11:00 2.50 DRILL P WEXIT Pick up, make up directional drilling BHA #18. Adjust motor
housing from 1.50 deg to 1.83 deg. Hold PJSM on loading
nuclear source. RIH to 237'
11:00 - 12:00 1.00 DRILL P WEXIT HSE review with Anchorage team.
12:00 - 14:30 2.50 DRILL P WEXIT RIH with BHA #18 on 4' drill pipe from 237' to 6,480'. Shallow
hole tested MWD ~ 1,145' - OK.
14:30 - 15:30 1.00 DRILL P WEXI7 Cut and slip drilling tine 76'. Clean out from under brake drum
area.
15:30 - 16:00 0.50 DRILL P WEXIT Obtain benchmark ECD's and sbw pump rates. CECD - 10.35
PPg•
16:00 - 20:30 4.50 DRILL P PRODS Directionally drill OA L4 from 6,577' to 6,982'. 100% sliding, no
backreaming. GPM - 290, PSI ON - 2,635, PSI OFF - 2,480,
WOB - 5-15k.
'Drilled out of OA shale into OBa sand (7' high to projected topj
~ 6,837' MD, 4,355 TVD. Drilled back up into OA shale f~
6,979' MD, 4,354 TVD.
20:30 -00:00 3.50 DRILL P PROD5 Directionally drill OA L4 from 6,982' to 7,240'. Survey every
30', backream each stand. GPM - 290, PSI ON - 2,780, PSI
OFF - 2,680, PU - 128k, SO - 74k, ROT - 95k, WOB - 5-10k,
RPM - 6D, TO ON - 5.5k, TQ OFF - 4.6k. AST - 2.56 hrs, ART
- .49 hrs, CECD - 10.42 ppg, AECD - 10.82 ppg.
2/10/2006 00:00 -00:00 24.00 DRILL P PRODS Directionally drill OA L4 from, 7,240' to 9,751'. Survey every
30', backream each stand. GPM - 290, PSI ON - 3,100, PSI
I OFF - 2,900, PU - 128k, SO - 97k, ROT - 98k, WOB - 5-15k,
Printed: 2/21/2006 10:57:46 AM
gp Page 20 of 23
Operations Summary Report
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6!2006 End: 2/16/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description-of Operations
2/10/2006 00:00 - 00:00 24.00 DRILL P i PRODS RPM - 60, TO ON - 7.4k, TO OFF - 6.7k. CECD - 10.86 ppg,
I AECD - 11.31 ppg. AST - 4.01 hrs, ART - 7.57 hrs.
2(1112006 00:00 - 09:30 9.50 DRILL P PRODS Directionally drill OA L4 from, 9,751' to TD ~ 10,593` MD,
4,358' TVD. Survey every 30', backream each stand. GPM -
~ 290, PSI ON - 2,995, PSI OFF - 2,800, PU - 128k, SO - 72k,
ROT - 94k, WOB - 10-15k, RPM - 60, TO ON - 7k, TO OFF -
~ 6k. CECD - 10.96 ppg, AECD - 11.04 ppg. AST - 1.63 hrs,
ART - 2.47 hrs.
I
TD OA Lateral 4 - 10,593' ~ 09:30 hr, 2/11/2006
09:30 - 10:00 0.50 DRILL P PROD5 Circulate open hole volume ~ 290 gpm, 2,800 psi, 60 rpm, 6k
TO. 9.2 PP9 MW.
10:00 - 00:00 14.00 DRILL P PRODS Monitor well - OK. MadPass log by backreaming ~ 600 fph
from 10,593' to 7,044'. GPM - 300, PSI -2,450, RPM - 60, TO
4.7k. CECD - 10.89 ppg, AECD - 11.26 ppg. Experienced
minor packing off in lower OA shales from 7,435' to 7,068'.
100-150 psi increase with 5% decrease in flow rate, (0 bbl pit
loss) with no increase in drag or torque. Slowed MadPass rate
and work up and down as necessary through trouble spots.
2/12!2006 00:00 - 01:00 1.00 DRILL P PROD5 Continue MadPass log by backreaming ~ 600 fph from 7,044'
to 6,671' without problem. Pull last stand through window
without rotation. No drag at window. GPM - 300, PSI -2,450,
RPM - 60, TO 4.7k. CECD - 10.85 ppg, AECD - 10.95 ppg.
01:00 - 02:00 1.00 DRILL P PROD5 Circulate bottoms up ~ 255 gpm, 1,780 psi, 40 rpm, 4.3k TO,
PU - 100k, SO - 89k. Monitor well - OK
02:00 - 02:30 0.50 DRILL P PRODS Service topdrive, blocks and crown.
02:30 - 05:00 2.50 DRILL P PROD5 Orient bit and go down through window ~ 6,548'. RIH from
6,548' to TD ~ 10,593'.
05:00 -06:00 1.00 DRILL P PRODS Circulate bottoms up ~ 290 gpm, 2,880 psi, 60 rpm, 6k TO.
PU - 129k, SO - 71 k, ROT - 95k. CECD - 10.84 ppg, AECD -
10.96 ppg. No change in AECD after bottoms up.
06:00 - 07:00 1.00 DRILL P PRODS Displace well from 9.2 ppg LSMOBM to 9.2 ppg SFMOBM ~
290 gpm, 2,880 psi, 60 rpm, 6k TQ. PU - 129k, SO - 71 k, ROT
- 95k.
07:00 - 09:30 2.50 DRILL P PRODS Monitor well - OK. POH from 10,593' to 6,540'. No drag
through window
09:30 - 10:30 1.00 DRILL P PROD5 Monitor well - OK. Drop i-7l8" ball, shear out circ sub.
Circulate bottoms up while backreaming from 6,540' to 6,194'
~ 420 gpm, 2,180 psi, 40 rpm, 4.5k tq. Pump dry job.
10:30 - 14:00 3.50 DRILL P PROD5 POH from 6,194' to 207'.
14:00 - 15:30 1.50 DRILL P PROD5 PJSM on nuclear source. Lay down BHA #18. Stand back
DC's. Lay down MWD, motor and bit. Bit #RR11 grade:
1-3-CT-A, X-1/16-BT-TD
15:30 - 16:00 0.50 DRILL P PRODS Clear and clean rig floor.
16:00 - 17:00 1.00 WHIP P RUNPRD Make up Baker Whipstock retrieval tools per Baker rep.
17:00 - 17:30 0.50 WHIP P RUNPRD Pick up 9 43/4" DC's from pipe shed from 99' to 378'.
17:30 - 18:30 1.00 WHIP P RUNPRD RIH with whipstock fishing assembly on 4' HWDP from 378' to
1,038'. Shallow hole test MWD - OK. 295 gpm, 1,020 psi.
18:30 - 22:00 3.50 WHIP P RUNPRD Continue RIH from 1,035' to 6,140'. Fill pipe and break
circulation starting ~ 4,164' and continue every 5 stands.
22:00 - 22:30 0.50 WHiP P RUNPRD Continue RIH from 6,043' to 6,500' washing down last 5
stands. Orient 10 deg left of high side. PU - 130k, SO - 85k
(pumps on)
Printed: ?l2tl2006 10:57:46 AM
BP
Operations Sulmmary Report
Page 21 of 23
Legal Well Name: V-203
Common Well Name: V-203 Spud Date: 1/8/2006
Event Name: DRILL+COMPLETE Start: 1/6/2006 End: 2/16/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2!16/2006
Rig Name: NABORS 9ES Rig Number:
'Date From - To Hours Task Code NPT Phase Description of-Operations
2/12/2006 22:30 - 23:00 0.50 WHIP P RUNPRD Shut down pumps. PU - 135k, SO - 90k. Latch into whipstock
on depth @ 6,554'. Pick up 20k over. Slack back down 5k to
verify in slot. Pull 45k over string weight to release trip anchor.
Slack off and set 10k back on whipstock, pick up easy to 90k
over and attempt to shear unloader valve. Slack off and set
10k back on whipstock, pick up faster to 70k over to jar and
shear unloader valve. Pick up to 6,526' to clear dummy seals
from L3 liner top. 6 bbls initial loss after unstinging from liner
top.
23:00 - 00:00 1.00 WHIP P RUNPRD Circulate bottoms up ~ 290 gpm, 2,020 psi. Lost 14 bbls while
circulating, lost 20 bbls total. Monitor well -static. 9.2 ppg
MW. Pump dry job.
2/13/2006 00:00 - 02:30 2.50 WHIP P RUNPRD POH with L4 whipstock from 6,526' to 377'. PU - 140k.
02:30 - 03:00 0.50 WHIP P RUNPRD Stand back 4 314" DC's.
03:00 - 05:00 2.00 WHIP P RUNPRD Lay down fishing assembly and fish. Recovered all of fish.
05:00 - 05:30 0.50 WHIP P RUNPRD Clean and clear rig floor. Lay down vendor tools.
05:30 - 06:30 1.00 CASE P RUNPRD Rig up to run L4 slotted liner.
06:30 - 12:00 5.50 CASE P RUNPRD PJSM on running liner. Pick up, make up Lateral 4 4.5" slotted
liner assembly per running detail to 4,038'. Made up
connections to mark for average of 3,600 ftJlbs make up torque
using Best-O-Life 2000 NM. Recorded up and down weights
every 10 jts.
12:00 - 16:30 I 4.50) CASE ) P
16:30 - 18:00) 1.50 ~ CASE ) P
Ran 4,038' total of:
1- 4.5" 12.6# L-80 BTC X-over bent joint with float shoe.
74 jts 4.5" 12.6# L-80 BTC slotted liner.
2 6.4" OD Swell packers.
17 jts 4.5" 12.6# L-801BT solid liner.
Baker flanged hook hanger assembly.
94 ea 4-5/8" x 5-3/4" x 8" centralizers, 90 ea free floating on
slotted joints 2-74, solid joints 1-17, 4 ea fixed on Swell packers
2 ea on each side of element
String weight: PU - 75k, SO - 60k
RUNPRD RIH with 4.5" slotted liner assembly on 4" drill pipe, 4" HWDP,
4-3/4' drill collars from 4,038' to 10,565" ~ 60 fpm. Worked
through window by rotating 10 rpms, 3k torque. Torque
increased to 3.4k torque, stopped rotating and go through
window on 1st attempt. PU - 105k, SO - 75k ~ window.
RUNPRD Hang flanged hook liner hanger ~ 6,560'. PU - 150k, SO -
75k. Made several attempts before successfully hanging liner
off by fuming and working torque down and going past window
10'. Hang liner with 35k set down weight. Pick up, slack off to
verify. Pick up and tum 180 deg., slack off and run past
window. Pick up and turn 180 deg, slack off and re-hang liner.
Pick up and slack off to verify. Hang liner with 35k set down
weight. Break off topdrive, drop 29/32" ball and pump down to
ball seat. Pressure up to 2,300 psi and release HR running
tool. Hold pressure i minute, pick up and verify tool release,
PU - 135k. Pressure up to shear ball seat ~ 4,500 psi. Pick
up to 6,525'.
Shoe ~ 10,576'.
Tops:
PBTMD - 10,574'.
Printed: 2/25/2006 10:57:46 AM
BP
Operatiolns Summary Report
Legal Well Name: V-203
Common Well Name: V-203
Event Name: DRILL+COMPLETE Start: 1/6/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 2/16/2006
Rig Name: NABOBS 9ES Rig Number:
Date I From - To. I Hours ~ Task I Code ~ NPT Phase
2/13/2006 116:30 - 18:00 I 1.501 CASE I P
18:00 - 19:00 I 1.001 CASE I P
19:00 - 23:00 4.00 CASE P
23:00 - 23:30 0.50 CASE P
23:30 -00:00 0.50 CASE P
2/14/2006 00:00 - 00:30 0.50 CASE P
00:30 - 02:30 2.00 CASE P
02:30 - 06:00
06:00 - 07:30
3.501 CASE I P
1.501 CASE I P
07;30 - 08:30 I 1.00 I CASE I P
08:30 - 11:00 2.50 CASE P
11:00 - 15:00 I 4.001 CASE i P
15:00 - 21:00 6.00 CASE P
21:00 - 22:00 1.00 CASE P
22:00 - 22:30 0.50 CASE P
22:30 -00:00 1.50 CASE P
00:00 - 01:30 1.50 CASE P
01:30 - 02:00 0.50 CASE P
02:00 - 02:10 0.17 CASE P
02:10 - 05:30 3.33 CASE P
05:30 - 06:00 ~ 0.501 BUNCO
06:00 - 08:00 2.00 BUNCO
08:00 - 08:15 I 0.25
08:15 - 19:30 I 11.25
19:30 - 22:00 i 2.50
Page 22 of 23
Spud Date: 1/8/2006
End: 2/16/2006
Description of Operations
RUNPRD Sofid XO jt - 10,534'.
Slotted liner - 7,395.
Bottom Swell Pkr - 7,338'.
Top Swel{ Pkr - 6,598'
Liner top - 6,543'
RUNPRD Monitor well - OK. Circulate bottoms up ~ 300 gpm, 1,500 psi.
9.2 PP9 MW.
RUNPRD POH from 6,525' to liner running tool.
RUNPRD Service break liner running tool, lay down same.
RUNPRD Clean and clear rig floor.
RUNPRD Rig up to run LEM #3.
RUNPRD Held PJSM, P/U Non Locating Seal Assy, 1 ea. 4.5" 12.6# L-80
XO joint, 2 ea 4.5" 12.6# L-80 IBT liner jt, LEM Hanger, 1 ea
4.5" 12.6# L-80 IBT-M pup jt, Casing Swivel, 5-1/2" HYD 563 x
4-1/2" IBT XO Bushing, Baker ZXP Liner top Packer. 214' total
length. Pick up 2 3/8" inner string 180'.
RUNPRD RIH with LEM #3 assembly on 4" drill pipe, HWDP, and drill
collars from 214' to 6,644'. PU - 136k, SO - 89k.
RUNPRD Break circulation and wash down ~ 2 bpm, 580 psi through
LEM #2 Liner Top Tie-back Sleeve and Seal Bore Extension on
depth. Hang off LEM #3 on L4 hook hanger with seal
assembly positioned 11 ft into LEM #2 Seal Bore Extension.
Drop ball and circulate to ball seat. Stage pressure up to 4,000
psi to set LEM #3 Liner Top Packer ~ 6,498'. Bleed off
pressure. Pressure up to 1,500 psi on annulus to test packer
for 5 min - OK.
LEM # 3 Tie Back - 11'L x 5.75" ID ~ 6,498'
RUNPRD Pull up to 6,511'. Circulate bottoms up ~ 353 gpm, 2,120 psi.
RUNPRD Displace well from 9.2 ppg SFMOBM to 9.2 ppg brine ~ 327
9Pm, 1,170 psi.
RUNPRD Blow down surface tines. Clean trip tank, mud troughs,
possum belly, shakers and rig floor.
RUNPRD Lay down drill pipe, HWDP, and drill collars from 6,511' to 200'.
RUNPRD Cut & slip drilling line 90'.
RUNPRD Service topdrive, crown, and blocks.
RUNPRD Lay down LEM running tools and 2 3/8' inner string.
RUNPRD RIH with 4"15.7ppf drill pipe to 4,581'.
RUNPRD CBU at 140 SPM, 348 GPM, 490 psi.
RUNPRD Flow check, wellbore stable.
RUNPRD POH lay down 4"15.7ppf drill pipe from 4,581' to surface.
RUNCMP Pull wear ring, make dummy run with FMC tubing hanger, OK.
RUNCMP Rig up Nabors tubing tongs and 4-1/2" handling tools. Rig up
Schlumberger I-Wire spool and sheave.
RUNCMP Hold PJSM with rig crew and service hands on 4-1/2'
completion running procedure.
RUNCMP RIH with 4-1/2" 12.6ppf L-80 IBT production string and
completion equipment. M/U and test I-Wire. Cont. R1H, check
I-Wire intergrity every 1,000'. Ran total 150 jts of tubing- 87
cable clamps, 3 SS bands.
RUNCMP Space out WLEG inside Tie-back sleeve. Install 12 blast rings
and 2 stop rings on tbg hgr. M/U space out pup jt. and tbg hgr.
Hook up 1-Wire and test to 5,000 psi for 10 min.,OK. Slack off
Printed: 2/21/2006 70:57:46 AM
g p Page 23 of 23
Operations Summary Report
Legal Well Name: V-203
Common Well Name: V-203
Event-Name: DRILL+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING I
Rig Name: NABOBS 9ES
Date From = To f Hours ~ 'Task Code ` NPT
Start: 1/6/2006
Rig Release: 2/16/2006
Rig Number:
Spud Date: 1/8/2006
End: 2/16/2006
5/2006 119:30 - 22:00 I 2.50
22:00 - 23:00 I 1.00 I R
23:00 - 00:00 I 1.00
6/2006 100:00 - 01:30 1 1.50
01:30 - 02:30 1.00 BOPSUF{ P
02:30 - 05:00 2.50 WHSUR I P
05:00 - 06:30 } 1.50 WHSUR P
06:30 - 07:00 I 0.50 WHSUR P
07:00 - 08:00 1.00 RIGU P
08:00 - 12:00 4.00 CLEAN P
12:00 - 15:00 I 3.001 DHEOP ~ P
15:00-19:00 ~ 4.OO~WHSUR~P
19:00 - 20:00 1 1.001 WHSUR 1 P
20:00-21:00 I 1.OOf WHSUR~P
21:00 - 00:00 3.00 RIGD P
Phase ~ Description of Operations
RUNCMP and land tbg. Up Wt 95K, Dn Wt 75K. RILDS, Set TWC in tbg
hgr.
RUNCMP Rig down Nabors tubing tongs and 4-1/2" handling tools. Rig
down Schlumberger t-Wire spool and sheave.
RUNCMP Clear rig floor. Clean out catch pans under rig floor and pipe
racks.
RUNCMP Clean out mud and cuttings from catch pans and pipe racks
under rig floor.
RUNCMP N/D BOPE, set stack on stump in cellar.
RUNCMP Move adapter flange into well cellar. N/U adapter flange with
I-Wire. PT to 5,000 psi, OK
RUNCMP Move Tree into well cellar. N/U tree. PT to 5,000 psi, OK
RUNCMP R/U DSM high pressure lubricator on top of tree. Pull TW C,
R/D lubricator.
RUNCMP R/U circulating lines on tree. PT to 3,500 psi.OK
CLEAN Reverse circulate 100 bbls clean 9.2ppg brine followed by 100
bbls clean 9.2ppg brine treated with corrosion inhibitor. Pump
at 56 spm, 127 gpm, 200 psi.
OTHCMP Drop 1.875° OD ball & rod down the tubing string to set packer.
Pressure up to 4,200 psi to set packer and test tubing. Hold for
30 min. OK. Bleed off tubing pressure to 2,300 psi. Pressure
up on the tubing x casing annulus to 3,500 psi. Hold for 30 min.
OK, Bleed tubing pressure to 0. Pressure up on tubing x casing
annulus to 3,500 psi to shear DCK valve. Pump on well to
verify shear valve open. OK.
OTHCMP PJSM, R/U Little Red Services to freeze protect well. PT
surface tines to 3,500 psi, OK. Pump 115 bbis diesel down the
tubing x casing annulus ~ 2 bpm ICP 500 psi, FCP 900
psi.U-tube diesel to tubing. SIAP = 150 psi, SITP= 125 psi.
Clear diesel from surface lines. R/D Little Red Services.
OTHCMP R/U DSM high pressure lubricator. Set BPV. R/D
lubricator.lnstall VR plugs in well head annulus valves.
OTHCMP Secure well head and tree for rig move.
PRE PJSM. Prepare for rig move. Blow down lines with air. Un-pin
blocks. Bridle up. Lower down cattle chute. Prepare to lower
derrick. Release rig from operations on well V-203 at 00:00 hrs
02/16/2006.
Printed: 2/21/2006 10:57:46 AM
V-203 L3 S u
Report Date: 5-Feb-06
Client: BP Exploration Alaska
Field: Prudhoe Bay Unit - WOA
Structure /Slot: V-Pad /Plan V-203 (N-A)
Well: V-203
Borehole: V-203L3
UWVAPI#: 500292328562
Survey Name I Date: V-203L3 /February 5, 2006
Tort I AHD ! DDI / ERD ratio: 321.753° / 8346.65 ft / 6.809 / 1.891
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet
Location Lat/Long: N 7019 40.471, W 149161.221
Location Grid WE Y/X: N 5970046.490 ftUS, E 590380.870 ftUS
Grid Convergence Angle: +0.69021689°
Grid Scale Factor: 0.99990928
Report Schlumherg~r
Survey /DLS Computation Method: Minimum Curvature / Lubinski
Vertical Section Azimuth: 20.000°
Vertical Section Origin: N 0.000 ft, E 0.000 ft
ND Reference Datum: Rotary Table
ND Reference Elevation: 81.20 ft relative to MSL
Sea Bed /Ground Level Elevation: 52.70 ft relative to MSL
Magnetic Declination: 24.352°
Total Field Strength: 57579.732 nT
Magnetic Dip: 80.843°
Declination Date: February 04, 2006 •
Magnetic Declination Model: BGGM 2005
North Reference: True North
Total Corr Mag North •> True North: +24.352°
Local Coordinates Referenced To: Well Head
Measured Vertical Along Nole
Comments Inclination Azimuth Sub-Sea TVD TVD Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft tt h ft h it de 10011 ftUS ftUS
H I t U.UU U.VU U.UV -PSI.LU U.UU U.UU U.UU V.UU U.UV U.UU U.W bylW4ti.4y byV:it5V.t3/ N /U ly 4U.4/l W 14y lti 1.ZLl
CB GYRO SS 54.00 0.25 326.00 -27.20 54.00 0.07 0.12 0.12 0.10 -0.07 0.46 5970046.59 590380.80 N 7019 40.472 W 14916 1.223
162.00 0.50 115.00 80.80 162.00 0.17 0.56 0.25 0.09 0.23 0.67 5970046.59 590381.10 N 70 19 40.472 W 149 161.215
256.00 3.00 137.00 174.75 255.95 -0.99 3.41 2.95 -1.88 2.28 2.71 5970044.64 590383.17 N 70 19 40.452 W 149 16 1.155
349.00 3.50 143.00 267,60 348.80 -3.64 8.67 8.19 -5.93 5.65 0.65 5970040.63 590386.59 N 70 19 40.412 W 149 16 1.056
441.00 3.25 150.00 359.44 440.64 -6.84 14.08 13.54 -10.43 8.64 0.52 5970036.17 590389.64 N 70 19 40.368 W 149 16 0.969
Last CB GYRO SS 532.00 2.75 179.00 450.32 531.52 -10.54 18.75 17.88 -14.84 9.97 1.73 5970031.77 590391.02 N 70 19 40.325 W 149 16 0.930
First MWD+IFR+MS 572.65 2.65 201.89 490.93 572.13 -12.39 20.64 19.27 -16.69 9.64 2.65 5970029.92 590390.71 N 7019 40.306 W 149 i6 0.940
665.37 3.57 243.08 583.52 664.72 -16.64 25.46 20.95 -19.99 6.26 2.54 5970026.58 590387.37 N 70 19 40.274 W 14916 1.038
757.12 3.64 275.25 675.10 756.30 -19.47 31.08 21.03 -21.01 0.81 2.18 5970025.49 590381.94 N 70 19 40.264 W 149 16 1.198
808.00 4.00 273.50 725.86 807.06 -20.38 34.47 20.92 -20.76 -2.57 0.74 5970025.70 590378.56 N 70 19 40.266 W 149 1
880.93 4.70 284.35 798.58 879.78 -21.40 39.98 21.41 -19.86 -8.00 1.48 5970026.53 590373.11 N 70 19 40.275 W 149 1
942.02 5.34 292.23 859.44 940.64 -21.54 45.32 22.37 -18.17 -13.06 1.54 5970028.17 590368.04 N 70 19 40.292 W 149 16 1.602
1035.95 8.34 301.48 952.69 1033.89 -20.01 56.48 26.32 -12.95 -22.91 3.39 5970033.26 590358.12 N 70 i 9 40.343 W 149 16 1.890
1129.14 11.32 305.21 1044.51 1125.71 -16.26 72.38 36.39 -4.15 -36.15 3.27 5970041.91 590344.77 N 7019 40.430 W 149 16 2.277
1220.42 15.05 306.44 1133.36 1214.56 -10.56 93.20 53.62 8.06 -53.01 4.10 5970053.91 590327.77 N 70 19 40.550 W 149 16 2.769
1312.85 19.18 304.31 1221.68 1302.88 -3.41 120.39 78.88 23.75 -75.22 4.52 5970069.33 590305.38 N 70 19 40.704 W 149 16 3.417
1406.18 22.33 303.92 1308.95 1390.15 4.65 153.46 110.98 A2.29 -102.60 3.38 5970087.54 590277.78 N 70 19 40.887 W 149 16 4.216
1499.98 28.05 305.47 1393.79 1474.99 14.83 193.37 150.20 65.05 -i 35.38 6.i 4 5970109.90 590244.73 N 70 19 41,110 W 149 16 5.173
1593.47 31.72 301.62 1474.84 1556.04 25.65 239.93 196.42 90.71 -174.22 4.43 5970135.08 590205.58 N 70 19 41.363 W 14916 6.307
1689.37 31.97 302.09 1556.31 1637.51 36.04 290.53 246.90 117.41 -217.20 0.37 5970161.26 590162.29 N 70 19 41.625 W 149 16 7.562
1782.55 33.40 301.71 1634.73 1715.93 46.42 340.84 297.14 144.00 -259.92 1.55 5970187.33 590119.26 N 70 19 41,887 W 149 16 8.809
1875.33 34.45 304.35 1711.72 1792.92 58.10 392.62 348.80 172.23 -303.32 1.95 5970215.04 590075.53 N 70 19 42.164 W 149 16 10.076
SurveyEditor Ver SP 1.0 Bld( doc40x_56) Plan. V-203 (N-A)\V-203\V-203L3\V-203L3 Generated 3/24/2006 2:56 PM Page 1 of 6
Measured Vertical Along Hole
Comments
Depth Inclination Azimuth Sub-Sea ND ND
Section
Departure Closure NS EW DLS Northing Easting Latitude Longitude
ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS
19tiy.24 37,y4 3U4.tt"L 17t37,4y ltifitt.(i9 7'L.UI 44t3.V7 4U4.U/ 'LU3./1 -;i4tS.yEi :i./3 Sy/UZ45.`3ti SyUUZy.b1 N /U ly 4'L.4/4 W 14y 1(i 11.4Uy
2061.85 42.21 305.46 1858.34 1939.54 87.66 507.67 463.49 238.03 -397.69 4.63 5970279.69 589980.37 N 70 19 42.811 W 149 16 12.831
2155.32 47.01 305.75 1924.87 2006.07 105.32 573.30 528.92 276.24 -451.04 5.14 5970317.25 589926.57 N 70 19 43.187 W 149 16 14.389
2248.06 51.56 305.07 1985.35 2066.55 123.98 643.57 599.04 316.95 -508.33 4.94 5970357.26 589868.81 N 70 19 43.588 W 149 16 16.061
2341.42 56.07 304.38 2040.45 2121.65 143.11 718.90 674.30 359.85 -570.25 4.87 5970399.41 589806.38 N 70 19 44.009 W 149 1617.869
2435.00 59.07 304.54 2090.63 2171.83 162.83 797.88 753.22 404.54 -635.37 3.21 5970443.31 589740.73 N 70 19 44.449 W 149 16 19.770
2529.21 59.08 304.99 2139.04 2220.24 183.43 878.70 833.98 450.62 -701.76 0.41 5970488.59 589673.80 N 70 19 44.902 W 149 16 21.709
2623.51 58.33 305.29 218$.03 2269.23 204.48 959.28 914.49 497.00 -767.65 0.84 5970534.16 589607.36 N 70 19 45.358 W 149 16 23.633
2716.98 59.27 305.21 2236.45 2317.65 225.50 1039.23 994.38 543.14 -832.94 1.01 5970579.51 589541.52 N 70 19 45.812 W 149 16 25.539
2809.27 59.23 305.86 2283.64 2364.84 246.75 1118.54 1073,63 589.24 -897.49 0.61 5970624.82 589476.43 N 70 19 46.265 W 149 16 27.423
2903.69 60.37 304.93 2331.13 2412.33 268.41 1200.14 1155.18 636.50 -964.01 1.48 5970671.28 589409.35 N 70 i 9 46.730 W 1491
6
2997.80 60.19 304.36 2377.79 2458.99 289.07 1281.87 1236.90 682.97 -1031.25 0.56 5970716.92 589341.57 ~
N 70 19 47.187 W 149 1 9
3090.94 60.53 302.57 2423.85 2505.05 307.92 1362.83 1317.84 727.60 -1098.78 1.71 5970760.74 589273.51 N 70 19 47.626 W 149 16 33.301
3184.76 59.75 303.25 2470.56 2551.76 326.09 1444.19 1399.20 771.81 -1167,08 1.04 5970804.11 589204.68 N 70 19 48.060 W 14916 35.295
3277.97 59.38 301.47 2517.78 2598.98 343.30 1524.55 1479.55 814.82 -1234.96 1.69 5970846.30 589136.30 N 70 19 48.483 W 149 16 37.277
3370.51 59.75 300.94 2564.66 2645.86 358.$0 1604.34 1559.28 856.16 -1303.21 0.64 5970886.81 589067.56 N 70 19 48.890 W 149 16 39.270
3478.73 58.70 300.75 2620.03 2701.23 376.30 1697.32 1652.18 903.83 -1383.04 0.98 5970933.51 588987.18 N 70 19 49.358 W 149 16 41.601
3510.56 58.60 301.04 2636.59 2717.79 381.43 1724.50 1679.34 917.79 -1406.36 0.84 5970947.19 588963.69 N 70 19 49.496 W 149 16 42.282
3606.00 58.42 300.44 2686.45 2767.65 396.60 1805.89 1760.66 959.39 -1476.31 0.57 5970987.94 588893.25 N 70 19 49.905 W 149 16 44.324
3701.64 59.05 300.75 2736.08 2817.28 411.63 1887.64 1842.34 1001.00 -1546.68 0.71 5971028.69 588822.39 N 70 19 50.314 W 149 16 46.379
3797.08 58.65 301.14 2785.45 2866.65 427.14 1969.32 1923.97 1043.00 -1616.73 0.55 5971069.84 588751.84 N 70 19 50.727 W 149 16 48.425
3892.71 58.77 300.79 2835.12 2916.32 442.68 2051.04 2005.65 1085.04 -1686.81 0.34 5971111.03 588681.27 N 70 19 51.140 W 149 16 50.471
3987.85 58.28 301.49 2884,79 2965.99 458.36 2132.18 2086.76 1127.00 -175626 0.81 5971152.15 58861 i .33 N 7019 51.553 W 149 16 52.499
4083.32 59.05 302.98 2934.44 3015.64 475.64 2213.72 2168.30 1170.50 -1825.23 1.56 5971194.81 588541.85 N 70 19 51.980 W 149 1654.513
4179.27 58.77 302.83 2983.99 3065.19 494.00 2295.59 2250.47 1215.14 -1894.21 0.32 5971238.61 588472.33 N 70 19 52.419 W 149 16 56.527
4275,30 59.57 303.12 3033.21 3114.41 512.51 2378.35 2332.92 1260.02 -1963.39 0.87 5971282.65 588402.63 N 70 19 52.860 W 149 16 58.547
4367.74 59.02 302.44 3080.41 3161.61 530.09 2457.83 2412.40 1303.05 -2030.21 0.87 5971324.87 5$8335.30 N 70 19 53.283 W 149 i7 0.499
4460.44 59.45 302.67 3127.82 3209.02 547.41 2537.48 2492.06 1345.91 -2097.35 0.51 5971366.92 588267.66 N 70 19 53.705 W 149 1 9
4553.88 59.69 301.71 3175.15 3256.35 564.42 2618.05 2572.62 1388.83 -2165.53 0.92 5971409.01 588198.97 N 70 19 54.127 W 149 1 1
4647.31 59.55 301.12 3222.40 3303.60 580.37 2698.65 2653.20 1430.84 -2234.32 0.57 5971450.18 588129.69 N 7019 54.540 W 149 1 9
4741.41 59.20 301.17 3270.34 3351.54 596.02 2779.63 2734.15 1472.72 -2303.62 0.37 5971491.22 588059.89 N 70 19 54.951 W 149 17 8.483
4834.50 58.61 302.36 3318.42 3399.62 612.27 2859.34 2813.85 1514.69 -2371.39 1.26 5971532.36 587991.62 N 70 19 55.364 W 149 17 10.462
4928.48 59.37 301.78 3366.83 3448.03 629.12 2939.89 2894.40 1557.45 -2439.65 0.97 5971574.30 587922.86 N 70 19 55.784 W 14917 12.456
5021.57 59.92 302.05 3413.88 3495.08 645.70 3020.22 2974.72 1599.92 -2507.83 0.64 5971615.94 587854.18 N 70 19 56.201 W 149 1714.447
5115.51 59.04 302.45 3461.58 3542.78 662.87 3101.14 3055.64 1643.10 -2576.27 1.01 5971658.29 587785.23 N 70 19 56.626 W 149 1716.446
5208.87 58.57 302.45 3509.94 3591.14 680.09 3181.00 3135.51 i 685.95 -2643.87 0.50 5971700.32 587717.33 N 7019 57.047 W 149 17 18.414
5302.94 58.31 303.02 3559.18 3640.38 697.76 3261.16 3215.66 1729.29 -2711.09 0.59 5971742.84 587649.40 N 70 19 57.473 W 149 17 20.383
5396.30 57.47 304.77 3608.80 3690.00 716.74 3340.23 3294.71 1773.39 -2776.73 1.82 5971786.14 587583.24 N 70 19 57.907 W 149 17 22.300
5489.49 57.42 309.34 3658.97 3740.17 739.77 3418.77 3372.99 1820.70 -2839.39 4.13 5971832.68 587520.02 N 70 19 58.372 W 149 17 24.131
5581.52 57.23 313.54 3708.67 3789.87 768.07 3496.22 3449.54 1871.95 -2897.44 3.85 5971883.23 587461.36 N 70 19 58.875 W 149 17 25.826
5675.08 59.29 315.98 3757.89 3839.09 801.40 3575.78 3527.42 1927.98 -2953.92 3.13 5971938.57 587404.22 N 70 19 59.426 W 149 17 27.476
SurveyEditor Ver SP 1.0 Bld( doc40x_56) Plan V-203 (N-A)\V-203\V-203L3\V-203L3 Generated 3/24/2006 2:56 PM Page 2 of 6
r
Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS
5767.56 59.11 318.54 3805."L5 3886.45 831.18 3fi55.Z'L 36U4.5U 1986.31 -3UU/.82 'L.39 59719911.24 58/349.tSr N /U LU U.000 W 149 1 / 19.p51
5861.46 58.95 322.80 3853.59 3934.79 878.84 3735.72 3681.45 2048.56 -3058.84 3.89 5972057.87 587297.86 N 70 20 0.612 W 149 17 30.541
5953.39 59.00 325.43 3900.97 3982.17 923.01 3814.50 3755.43 2112.38 -3105.01 2.45 5972121.12 587250.93 N 70 20 1.239 W 149 17 31.890
6046.33 60.44 330.23 3947.86 4029.06 972.24 3894.74 3829.06 2180.30 -3147.70 4.72 5972188.52 587207.43 N 70 20 1.907 W 149 17 33.138
6139.37 62.62 334.67 3992.22 4073.42 1027.44 3976.52 3901.59 2252.80 -3185.48 4.80 5972260.55 587168.78 N 70 20 2.620 W 149 17 34.242
6233.23 60.79 339.10 4036.73 4117.93 1087.73 4059.15 3972.19 2328.77 -3217.94 4.59 5972336.11 587135.41 N 70 20 3.367 W 149 17 35.191
6326.47 59.19 341.69 4083.37 4164.57 1149.91 4139.88 4038.99 2404.81 -3245.04 2.95 5972411.82 587107.40 N 70 20 4.115 W 149 17 35.983
6419.24 58.90 346.89 4131.11 4212.31 1214.47 4219.43 4102.15 2481.35 -3266.58 4.82 5972488.09 587084.95 N 70 20 4.867 W 149 17 36.613
6512.05 60.93 350.24 4177.64 4258.84 1282.99 4299.72 4162.75 2560.05 -3282.47 3.81 5972566.58 587068.1.1 N 70 20 5.641 W 149 17 37.078
6604.80 62.91 355.08 4221.32 4302.52 1355.66 4381.54 4221.25 2641.18 -3292.89 5.07 5972647.57 587056.71 N 70 20 6.439 W 149 17 37.383
Tie-In Survey 6698.56 65.73 357.97 4261.95 4343.15 1433.16 4466.03 4278.44 2725.50 -3297.98 4.09 5972731.82 587050.60 N 70 20 7.268 W 149 173
Top Window (Blind) 6732.00 66.20 359.19 4275.57 4356.77 1461.59 4496.57 4298.53 2756.03 -3298.74 3.62 5972762.33 587049.48 N 70 20 7.569 W 149 17 56
Base Window (Blind) 6744.00 68.10 358.89 4280.23 4361.43 1471.91 4507.63 4305.77 2767.09 -3298.92 16.00 5972773.38 587049.16 N 70 20 7.677 W 149 17 37.561
Inc+Trend 6760.12 67.88 359.85 4286.27 4367.47 1485.90 4522.57 4315.52 2782.03 -3299.09 5.69 5972788.32 587048.82 N 70 20 7.824 W 149 17 37.566
6791.28 69.88 1.66 4297.50 4378.70 1513.34 4551.64 4334.02 2811.09 -3298.70 8.40 5972817.39 587048.85 N 70 20 8.110 W 149 17 37.555
6820.99 72.77 3.34 4307.01 4388.21 1540.18 4579.78 4351.37 2839.21 -3297.47 11.10 5972845.51 587049.74 N 70 20 8.387 W 14917 37.520
6852.71 76.03 5.10 4315.54 4396.74 1569.58 4610.33 4369.61 2869.67 -3295.22 11.58 5972876.00 587051.63 N 70 20 8.686 W 149 17 37.454
6884.37 79.06 6.81 4322.37 4403.57 1599.56 4641.24 4387.45 2900.41 -3292.01 10.93 5972906.77 587054.47 N 70 20 8.989 W 14917 37.361
6914.09 82.82 8.34 4327.05 4408.25 1628.22 4670.58 4403.84 2929.50 -3288.14 13.63 5972935.90 587057.99 N 70 20 9.275 W 149 17 37.248
6945.34 85.46 10.03 4330.24 4411.44 1658.75 4701.66 4420.63 2960.18 -3283.18 10.02 5972966.64 587062.58 N 70 20 9.577 W 149 17 37.104
Last Inc_Trend 6976.97 88.81 11.67 4331.82 4413.02 1689.93 4733.25 4437.07 2991.21 -3277.23 11.79 5972997.73 587068.15 N 70 20 9.882 W 149 17 36.930
MWD+IFR+MS 7008.28 89.85 13.30 4332.19 4413.39 1720.97 4764.56 4452.76 3021.77 -3270.46 6.18 5973028.37 587074.55 N 70 2010.182 W 14917 36.733
7040.30 92.45 12.88 4331.54 4412.74 1752.75 4796.57 4468.68 3052.95 -326321 8.23 5973059.63 587081.42 N 70 2010.489 W 149 17 36.522
7071.63 95.49 14.45 4329.37 4410.57 1783.81 4827.82 4484.11 3083.32 -3255.83 10.91 5973090.08 587088.44 N 70 20 10.788 W 149 17 36.307
7103.21 96.70 15.21 4326.02 4407.22 1815.08 485922 4499.24 3113.67 -3247.80 4.52 5973120.53 587096.11 N 70 20 11.086 W 149 17 36.072
7135.28 96.56 16.26 4322.32 4403.52 1846.85 4891.08 4514.31 3144.33 -3239.16 3.28 5973151.29 587104.37 N 70 20 11.388 W 149 17 35.820
7166.93 96.98 17.38 4318.59 4399.79 1878.23 4922.51 4528.82 3174.42 -3230.06 3.76 5973181.47 587113.10 N 70 20 11.684 W 149 17 35.555
7198.30 98.71 15.96 4314.30 4395.50 1909.25 4953.58 4543.41 3204.18 -3221.15 7.11 5973211.35 587121.66 N 70 20 11.977 W 149 17 95
7228.92 100.40 12.57 4309.22 4390.42 1939.29 4983.77 4558.84 3233.44 -3213.71 12.23 5973240.69 587128.75 N 70 20 12.264 W 149 178
7257.84 100.08 13.25 4304.08 4385.28 1967.53 5012.23 4574.10 3261.18 -3207.35 2.56 5973268.50 587134.77 N 70 20 12.537 W 149 17 3
7288.57 98.69 10.27 4299.07 4380.27 1997.53 5042.55 4591.00 3290.86 -3201.17 10.58 5973298.25 587140.59 N 70 20 12.829 W 149 17 34.713
7320.21 98.93 11.42 4294.22 4375.42 2028.40 5073.82 4608.98 3321.57 -3195.29 3.67 5973329.02 587146.10 N 70 20 13.131 W 149 17 34.541
7352.74 96.74 10.12 4289.79 4370.99 2060.21 5106.04 4627.69 3353.22 -3189.27 7.81 5973360.75 587151.74 N 70 2013.443 W 14917 34.366
7384.41 95.06 9.48 4286.53 4367.73 2091.21 5137.54 4646.56 3384.27 -3183.91 5.67 5973391.85 587156.73 N 70 20 13.748 W 14917 34.210
7415.51 92.96 8.84 4284.36 4365.56 2121.68 5168.57 4665.55 3414.89 -3178.97 7.06 5973422.53 587161.29 N 70 20 14.049 W 149 17 34.066
7446.61 90.14 8.81 4283.52 4364.72 2152.17 5199.65 4684.84 3445.61 -3174.20 9.07 5973453.30 587165.69 N 70 20 14.351 W 149 17 33.927
7477.85 88.12 9.78 4283.99 4365.19 2182.86 5230.$9 4704.16 3476.43 -3169.15 7.17 5973484.18 587170.36 N 70 20 14.654 W 149 17 33.780
7509.53 88.79 11.85 4284.84 4366.04 2214.12 5262.55 4723.21 3507.54 -3163.21 6.87 5973515.35 587175.93 N 70 20 14.960 W 149 17 33.607
7540.15 89.84 12.52 4285.21 4366.41 2244.46 5293.17 4741.17 3537.47 -3156.75 4.07 5973545.35 587182.03 N 70 20 15.255 W 149 17 33.419
7571.02 90.91 11.11 4285.01 4366.21 2275.01 5324.04 4759.57 3567.68 -3150.43 5.73 5973575.63 587187.99 N 70 20 15.552 W 149 17 33.234
7602.25 90.13 12.76 4284.72 4365.92 2305.93 5355.27 4778.27 3598.23 -3143.97 5.84 5973606.26 587194.08 N 70 20 15.852 W 149 17 33.046
SurveyEditor Ver SP 1.0 Bld( doc4Ox_56) Plan V-203 (N-A)\V-203\V-2O3L3\V-2O3L3 Generated 3/24/2006 2:56 PM Page 3 of 6
Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft ft ft tt ft ft de /100 ft ftUS ftUS
7633.20 88.69 13.77 4285.04 4366.24 2336.66 5386.22 4796.34 3628.35 -3136.87 5.68 5973636.46 587200.81 N 70 20 16.149 W 149 17 32.839
7665.22 87.99 16.60 4285.97 4367.17 2368.55 5418.22 4814.30 3659.24 -3128.49 9.10 5973667.44 587208.82 N 70 20 16.452 W 149 17 32.595
7696.42 88.56 18.20 4286.91 4368.11 2399.71 5449.41 4830.93 3689.00 -3119.16 5.44 5973697.31 587217.79 N 70 20 16.745 W 149 17 32.323
7728.05 89.21 19.49 4287.53 4368.73 2431.32 5481.03 4847.26 3718.92 -3108.95 4.57 5973727.35 587227.64 N 70 20 17.039 W 149 17 32.025
7758.01 89.88 19.25 4287.76 4368.96 2461.28 5510.99 4862.64 3747.19 -3099.01 2.38 5973755.73 587237.23 N 70 2017.317 W 149 17 31.735
7789.54 89.53 19.95 4287.93 4369.13 2492.81 5542.52 4878.87 3776.89 -3088.44 2.48 5973785.56 587247.45 N 70 20 17.610 W 149 17 31.426
7820.36 87.74 20.73 4288.66 4369.86 2523.62 5573.33 4894.52 3805.78 -3077.73 6.34 5973814.57 587257.81 N 70 20 17.894 W 149 17 31.114
7851.72 87.35 22.33 4290.00 4371.20 2554.94 5604.66 4910.03 3834.92 -3066.23 5.25 5973843.85 587268.96 N 70 20 18.180 W 149 17 30.778
7882.56 88.22 23.33 4291.20 4372.40 2585.72 5635.48 4924.82 3863.33 -3054.27 4.30 5973872.39 587280.57 N 70 20 18.460 W 149 17 30.429
7911.96 88.98 23.86 4291.91 4373.11 2615.05 5664,87 4938.72 3890.26 -3042.51 3.15 5973899.46 587292.01 N 70 20 18.725 W 149 17 30.086
7943.41 89.46 23.91 4292.34 4373.54 2646.42 5696,32 4953.60 3919.01 -3029.77 1.53 5973928.36 587304.39 N 70 20 19.008 W 149 175
7974.32 90.73 23.65 4292.29 4373.49 2677.27 5727.23 4968.43 3947.30 -3017.31 4.19 5973956.79 587316.51 N 70 20 19.286 W 149 17 51
8006.05 88.63 23.04 4292.47 4373.67 2708.94 5758.95 4984.02 3976.43 -3004,74 6.89 5973986.07 587328.73 N 70 20 19.572 W 149 17 28.984
8036.55 87.19 21.98 4293.58 4374.78 2739.39 5789.43 4999.52 4004.58 -2993.07 5.86 5974014.36 587340.06 N 70 20 19.849 W 149 17 28.643
8066.73 87.16 21.07 4295.07 4376.27 2769.52 5819.58 5015.42 4032.63 -2982.01 3.01 5974042.53 587350.78 N 70 20 20.125 W 149 17 28.321
8097.91 88.08 21.64 4296.36 4377.56 2$00.66 5850.73 5032.07 4061.64 -2970.67 3.47 5974071.68 587361.77 N 70 20 20.411 W i 49 17 27.990
8128.94 88.39 22.41 4297.32 4378.52 2831.66 5881.74 5048.48 4090.39 -2959.04 2.67 5974100.56 587373.05 N 70 20 20.693 W 149 17 27.650
8159.33 88.72 23.13 4298.09 4379.29 2862.00 5912.12 5064.35 4118.40 -2947.28 2.61 5974128.71 587384.47 N 70 20 20.969 W 14917 27.307
8190.95 87.62 21.82 4299.09 4380.29 2893.55 5943.73 5081.14 4147.61 -2935.20 5.41 5974158.06 587396.20 N 70 20 21.256 W 149 17 26.955
8221.67 88.22 21.67 4300.21 4381.41 2924.26 5974.43 5097.91 4176.12 -2923.82 2.01 5974186.70 587407.23 N 70 20 21.537 W 14917 26.623
8252.58 88.54 22.17 4301.08 4382.28 2955.14 6005.33 5114.84 4204.78 -2912.29 1.92 5974215.50 587418.42 N 70 20 21.819 W 14917 26.286
8283.97 88.71 21.69 4301.84 4383.04 2986.51 6036.71 5132.17 4233.89 -2900.57 1.62 5974244.75 587429.78 N 70 20 22.105 W 149 17 25.944
8314.90 87.43 21.31 4302.88 4384.08 3017.41 6067.62 5149.56 4262.66 -2889.24 4.32 5974273.64 587440.76 N 70 20 22.388 W 149 17 25.614
8345.68 85.46 20.90 4304.79 4385.99 3048.12 6098.34 5167.13 4291.31 -2878.18 6.54 5974302.43 587451.48 N 70 20 22.670 W 149 17 25.291
8376.19 85. t 0 21.55 4307.30 4388.50 3078.52 6128.74 5184.60 4319.66 -2867.17 2.43 5974330.90 587462.14 N 70 20 22.949 W 149 17 24.970
8406.87 84.84 21.23 4309.99 4391.19 3109.07 6159.31 5202.21 4348.11 -2856.02 1.34 5974359.48 587472.95 N 70 20 23.228 W 149 17 24.644
8438.66 86.80 24.04 4312.31 4393.51 3140.74 6191.01 5220.03 4377.37 -2843.82 10.76 5974388.89 587484.79 N 70 20 23.516 W 149 17 24.288
8469.72 87.74 24.11 4313.78 4394.98 3171,69 6222.03 5236.95 4405.70 -2831.17 3.03 5974417.36 587497.10 N 70 20 23.795 W 149 17
8500.86 87.13 23.59 4315.18 4396.38 3202.73 6253.14 5254.15 4434.15 -2818.59 2.57 5974445.96 587509.34 N 70 20 24.075 W 149 17
8531.60
86.00
22.76
4317.02
4398.22
3233.36
6283.83
5271.54
4462.36
-2806.51
4.56
5974474.31
587521.07
N 70 20 24.352 W 149 17 9
Z~9
8562.74 87.90 23.05 4318.68 4399.88 3264.42 6314.92 5289.41 4491.00 -2794.41 6.17 5974503.09 587532.83 N 70 20 24.634 W 149 17 22.846
8593.67 89.49 .23.00 4319.38 4400.58 3295.29 6345.84 5307.24 4519.46 -2782.32 5.14 5974531.69 587544.58 N 70 20 24.914 W 149 17 22.493
8624.89 89.07 23.20 4319.77 4400.97 3326.47 6377.06 5325.33 4548.17 -2770.07 1.49 5974560.55 587556.48 N 70 20 25.196 W 149 17 22.136
8656.50 88.26 22.42 4320.51 4401.71 3358.03 6408.66 5343.90 4577.30 -2757.82 3.56 5974589.82 587568.37 N 70 20 25.483 W 149 17 21.778
8687.28 88.09 21.99 4321.49 4402.69 3388.77 6439.43 5362.35 4605.79 -2746.19 i .50 5974618.44 587579.66 N 70 20 25.763 W 149 17 21.439
8718.88 88.22 21.75 4322.51 4403.71 3420.34 6471.01 5381.56 4635.10 -2734.43 0.86 5974647.88 587591.07 N 70 20 26.051 W 149 17 21.096
8749.04 88.10 21.33 4323.48 4404.68 3450.47 6501.15 5400.14 4663.14 -2723.36 1.45 5974676.05 587601.79 N 70 20 26.327 W 149 17 20.773
8780.35 89.54 21.60 4324.12 4405.32 3481.76 6532.46 5419.57 4692.27 -2711.90 4.68 5974705.32 587612.90 N 70 20 26.614 W 149 17 20.438
8811.47 90.80 21.34 4324.03 4405.23 3512.87 6563.57 5439.00 4721,23 -2700.51 4.13 5974734.41 587623.94 N 70 20 26.899 W 149 17 20.106
8841.85 90.14 21.42 4323.78 4404.98 3543.24 6593,95 5458.11 4749.51 -2689.44 2.19 5974762.82 587634.67 N 70 20 27.177 W 149 17 19.783
SurveyEditor Ver SP 1.0 Bld( doc40x_56) Plan V-203 (N-A)\V-203\V-203L3\V-203L3 Generated 3/24/2006 2:56 PM Page 4 of 6
t+
Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS
8872.86 91.66 23 .14 4323.29 4404 .49 3574.22 66'L4 .96 5477.34 4778. 20 -2677.68
8904.13 89.42 22 .53 4323.00 4404 .20 3605.45 6656 .23 5496.60 4807. 02 -2665.55
8934.82 88.83 22 .58 4323.47 4404 .67 3636.11 6686 .91 5515.73 4835. 36 -2653.78
8966.07 89.74 23 .48 4323.86 4405 .06 3667.31 6718 .16 5535.11 4864. 12 -2641.56
8997.52 88.85 22 .39 4324.24 4405 .44 3698.71 6749 .61 5554.77 4893. 08 -2629.30
9028.54 89.32 22 .83 4324.74 4405 .94 3729.70 6780 .62 5574.39 4921. 71 -2617.38
9059.43 89.10 21. 96 4325.16 4406 .36 3760.56 6811 .51 5594.13 4950. 27 -2605.61
9090.79 88.61 21 .53 4325.79 4406 .99 3791.90 6842. 86 5614.54 4979. 39 -2593.99
9122.38 88.78 21 .18 4326.51 4407 .71 3823.47 6874 .44 5635.37 5008. 80 -2582.49
9153.39 89.08 21 .59 4327.09 4408. 29 3854.46 6905 .45 5655.89 5037. 67 -2571.19
9184.14 89.80 21. 82 4327.39 4408. 59 3885.20 6936. 20 5676.22 5066. 24 -2559.82
9215.89 89.59 21 .46 4327.56 4408 .76 3916.94 6967 .95 5697.33 5095. 75 -2548.11
9247.45 89.07 20. 80 4327.93 4409. 13 394$.49 6999 .51 5718.62 5125. 19 -2536.73
9278.41 89.82 20 .53 4328.23 4409 .43 3979.44 7030 .46 5739.77 5154. 15 -2525.81
9309.90 89.22 21 .65 4328.49 4409 .69 4010.93 7061 .95 576122 5183. 53 -2514.48
9341.07 88.83 22 .89 4329.02 4410 .22 4042.07 7093 .12 5782.06 5212. 37 -2502.67
9371.79 89.60 23. 09 4329.44 4410. 64 4072.74 7123. 83 5802.40 5240. 65 -2490.67
9403.82 90.27 23. 47 4329.48 4410. 68 4104.72 7155. 86 5823.59 5270. 07 -2478.01
9434.70 89.51 22. 59 4329.54 4410. 74 4135.56 7186. 74 5844.21 5298. 49 -2465.93
9466.16 89.26 22. 39 4329.88 4411. 08 4166.98 7218. 20 5865.53 5327. 56 -2453.90
9496.70 89.85 22. 16 4330.11 4411. 31 4197.50 7248. 74 5886.40 5355. 82 -2442.32
9527.98 89.84 22. 03 4330.20 4411. 40 4228.76 7280. 02 5907.93 5384. 80 -2430.55
9559.08 90.38 20. 63 4330.14 4411. 34 4259.85 7311. 12 5929.72 5413. 77 -2419.24
9590.59 89.77 20. 53 4330.10 4411. 30 4291.36 7342. 63 5952.18 5443. 27 -2408.17
9621.36 90.75 21. 39 4329.96 4411. 16 4322.12 7373. 40 5974.04 5472. 00 -2397.16
7.4U 5974791.65 587ti46.07 N 70 20 27.459 W 149 17 19.440
7.42 5974820.61 587657.86 N 70 20 27.742 W 149 17 19.085
1.93 5974849.09 587669.29 N 70 20 28.021 W 149 17 18.742
4.10 5974877.98 587681.16 N 70 20 28.304 W 149 17 18.385
4.47 5974907.09 587693.07 N 70 20 28.589 W 149 17 18.027
2.08 5974935.86
2.90 5974964.55
2.08 5974993.81
1.23 5975023.36
1.64 5975052.36
2.46 5975081.06
1.31 5975110.71
2.66 5975140.28
2.57 5975169.37
4.03 5975198.88
4.17 5975227.86
2.59 5975256.27
2.40 5975285.84
3.77 5975314.40
1.02 5975343.61
2.07 5975372.00
0.42 5975401.12
4.82 5975430.22
1.96 5975459.85
4.24 5975488.71
587704.64
587716.06
587727.33
587738.47
587749.43
587760.45
587771.80
587782.82
587793.40
587804.37
587815.83
587827.49
587839.79
587851.53
587863.21
587874.44
587885.86
587896.82
587907.54
587918.20
587929.21
587940.41
587951.39
587962.48
587973.91
587985.58
587997.31
588008.88
588020.44
588032.05
588043.26
588054.65
588065.99
588077.47
588088.23
N 70 20 28.871 W 149 1717.679
N 70 20 29.151 W 149 17 17.336
N 70 20 29.438 W 149 17 16.997
N 70 20 29.727 W 149 1716.661
N 70 20 30.011 W 149 17 16.331
N 70 20 30.292 W 149 1 ~9
N 70 20 30.582 W 149 1 8
N 70 20 30.872 W 149 17 15.326
N 70 20 31.157 W 149 17 15.007
N 70 20 31.446 W 149 17 14.676
N 70 20 31.730 W 149 17 14.331
N 70 20 32.008 W 149 17 13.981
N 70 20 32.297 W 149 17 13.612
N 70 20 32.577 W 14917 13.259
N 70 20 32.863 W 149 17 12.908
N 70 20 33.141 W 149 17 12.570
N 70 20 33.426 W 149 17 12.226
N 70 20 33.711 W 149 17 11.896
N 70 20 34.001 W 149 17 11.573
N 70 20 34.283 W 149 17 11.252
N 70 20 34.567 W 149 17 10.920
N 70 20 34.855 W 149 17 10.583
N 70 20 35.140 W 149 17 10.252
N 70 20 35.425 W 149 ~8
N 70 20 35.714 W 149 4
N 70 20 35.998 W 149 17 9.223
N 70 20 36.281 W 14917 8.870
N 70 20 36.564 W 149 17 8.522
N 70 20 36.847 W 149 17 8.175
N 70 20 37.127 W 149 17 7.826
N 70 20 37.406 W 14917 7.489
N 70 20 37.693 W 149 17 7.146
N 70 20 37.975 W 14917 6.804
N 70 20 38.263 W 149 17 6.459
N 70 20 38.545 W 149 17 6.135
9652.34 92.12 21.68 4329.18 4410.38 4353.08 7404.37 5995. 91 5500.81 -2385.79 4.52 5975517.65
9683.85 93.15 21.36 4327.73 4408.93 4384.54 7435.85 6018. 22 5530. 09 -2374, 25 3.42 5975547.07
9715.03 94.17 21.37 4325.74 4406.94 4415.65 7466.96 6040. 41 5559. 07 -2362. 91 3.27 5975576.18
9746.27 92.47 21.67 4323.93 4405.13 4446.83 7498.15 6062. 68 5588. 08 -2351. 47 5.53 5975605.32
9777.91 91.66 22.11 4322.79 4403.99 4478,43 7529.77 6085. 19 5617. 42 -2339. 68 2.91 5975634.80
9809.21 90.61 23.04 4322.17 4403.37 4509.69 7561.06 6107. 28 5646. 31 -2327. 67 4.48 5975663.83
9840.44 89.74 22.50 4322.08 4403.28 4540.88 7592.29 6129. 34 5675. 11 -2315. 58 3.28 5975692.77
9871.60 89.67 22.46 4322.24 4403.44 4572.01 7623.45 6151. 53 5703. 90 -2303. 67 0.26 5975721.70
9902.67 90.62 22.63 4322.16 4403.36 4603.05 7654.52 6173. 72 5732. 60 -2291. 75 3.11 5975750.53
9933.62 89.63 22.79 4322.09 4403.29 4633.97 7685.47 6195. 83 5761. 15 -2279. 81 3.24 5975779.22
9964.17 88.10 21.66 4322.70 4403.90 4664.49 7716.01 6217. 91 5789. 42 -2268. 25 6.23 5975807.63
9995.72 88.59 22.09 4323.61 4404.81 4696.01 7747.55 6240. 91 5818. 69. -2256. 50 2.07 5975837.03
10026.63 89.21 22.35 4324.20 4405.40 4726.89 7778.45 6263. 39 5847. 30 -2244. 82 2.17 5975865.78
10058.21 87.55 21.69 4325.09 4406.29 4758.43 7810.02 6286. 51 5876. 56 -2232. 98 5.66 5975895.18
10088.98 86.83 20.65 4326.60 4407.80 4789.16 7840.75 6309. 39 5905. 22 -2221. 88 4. i i 5975923.97
10120.27 87.73 21.12 4328.09 4409.29 4820.41 7872.01 6332. 83 5934. 42 -2210. 74 3.24 5975953.30
588099.01 N 70 20 38.832 W 149 17 5.810
SurveyEditor Ver SP 1.0 Bld( doc40x_56) Plan V-203 (N-A)\V-203\V-203L3\V-203L3 Generated 3/24/2006 2:56 PM Page 5 of 6
r
Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de h ft ft it ft h ft de 100 it ftUS ftUS
lU1bG.U:i 2525.U/ LL.17 43Ly.Lb 441 V.4b 425bL.14 /yV:S./5 b3bb.4;3 byb3.yL -Ll yy.Vb
10183.27 89.06 22.60 4330.03 4411.23 4883.34 7934.97 6379.46 5992.81 -2187.17
10214.06 90.27 24.02 4330.21 4411.41 4914.08 7965.76 6401.87 6021.08 -2174.99
10245.85 89.23 22.91 4330.35 4411.55 4945.81 7997.55 6425.04 6050.24 -2162.33
10276.13 88.12 21.92 4331.05 4412.25 4976.05 8027.82 6447.54 6078.23 -2150.79
10307.42 88.70 22.51 4331.92 4413.12 5007,31 8059.10 6470.92 6107.18 -2138.96
10339.41 89.17 23.06 4332.52 4413.72 5039.25 8091.09 6494.69 6136.67 -2126.57
10370.58 89.74 23.30 4332.81 4414.01 5070.37 8122.26 6517.78 6165.32 -2114.31
10401.59 90.14 22.41 4332.85 4414.05 5101.34 8153.27 6540.94 6193.90 •2102.26
10431.89 91.05 23.23 4332.53 44i 3.73 5131.60 8183.56 6563.64 6221.82 -2090.51
10463.04 91.69 23.00 4331.79 4412.99 5162.70 8214.70 6586.93 6250.46 -2078.29
10494.41 91.32 21.92 4330.96 4412.16 5194.03 8246.06 6610.68 6279.45 -2066.31
10524.85 90.28 19.83 4330.54 4411.74 5224.46 8276.50 6634.33 6307.88 -2055.46
Last MWD+IFR+MS 10548.74 89.65 19.81 4330.55 4411.75 5248.35 8300.39 6653.20 6330.36 -2047.36
TD (Projected) 10595.00 89.65 19.81 4330.83 4412.03 5294.61 8346.65 6689.85 6373.88 -2031.68
Survey Type: Definitive Survey
NOTES: CB GYRO SS - (Camera-based gyro single shots -- Traditional surface referenced gyro tool run on wireline
-including "level rotor" gyros and Sperry-Sun SU3. Replaces ex-BP "PGSS" model.
INC+TREND - (Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of
drift to be predicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant)" model. )
MWD+IFR-MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing.
Assumes a BHA sag correction is applied to enhance inclination accuracy. )
Legal Description: Northing (Y) [ftUS] Easting (X) [ftUS]
Surface : 4801 FSL 1921 FEL S11 T11N R11E UM 5970046.49 590380.87
BHL : 651 FSL 4032 FEL S35 T12N R11 E UM 5976430.54 588186.01
:i.Ly 5y/by25L.y4 525251 I V.3b IV /V LV 3y.1LL VV 14y 1 / b.4bif
3.54 5976011.96 588121.88 N 70 20 39.406 W 14917 5.121
6.06 5976040.38 588133.72 N 70 20 39.684 W 149 17 4.766
4.78 5976069.69 588146.02 N 70 20 39.971 W 149 174.396
4.91 5976097.80 588157.23 N 70 20 40.246 W 149 17 4.059
2.64 5976126.90 588168.70 N 70 20 40.531 W 149 17 3.714
2.26 5976156.53 588180.73 N 70 20 40.821 W 149 17 3.352
1.98 5976185.33 588192.65 N 70 20 41.103 W 149 17 2.994
3.15 5976214.04 588204.35 N 70 20 41.384 W 149 17 2.642
4.04 5976242.10 588215.76 N 70 20 41.659 W 149 17 2.299
2.18 5976270.89 588227.64 N 70 20 41.940 W 149 1 2
3.64 5976300.01 588239.27 N 70 20 42.225 W 149 1 3
7.67 5976328.57 588249.77 N 70 20 42.505 W 149 17 276
2.64 5976351.14 588257.60 N 70 20 42.726 W 149 17 1.039
0.00 5976394.84 588272.75 N 70 20 43.154 W 149 17 0.582
SurveyEditor Ver SP 1.0 Bld( doc40x_56) Plan V-203 (N-A)\V-203\V-203L3\V-203L3 Generated 3/24/2006 2:56 PM Page 6 of 6
TRl6== FMC 4-1/8" 5M V-'Z
Wt3LHEA0 = FMC G9V 5 ~
V-203
ACTUATOR =
KB. ELEV = s,.2' V-203 L2
BF. atv = 52.7' V-203 L3
KOP = 700
Max Angle=L191.8 Q 7988' V-203 L4
Datum MD = xxxx'
Oatum ND = xxxx' SS
09'
110-314" CSG. 45.5 L-80. ~ = 9.95"
~ Finaf Compietior~ ~
DRLG DRAFT
2491' I-14-1/2" HES X NP, ~ = 3.81
GAS LNT MANDRELS
= 3.948" 1-1 6371'
14.5" PHNIX MULT~PRESS SENSOR, ID = 3.994" 1
~RA TAG I-j 6524' ~
7-5/8" x 5.5" BKR ZXP PACKER, O = 4.82" 6498'
Seal Assemby from LEM1#3 6698-6701
L4 BKR HUGHES HOOK HGR, ID = 5.62" 6543'
Minimum ID = 3.688" @ 6543',
6727' & 6827' - LEM's
RA TAG 6687'
7-5/8" x 5.5" BKR ZXP PACKER, O = 4.82" 6671'
Seal Assemby from LEM#2 6796-6799
L3 BKR HUGHES HOOK HGR, ID = 5.62" 6744'
I 6784' I
7-518" x 5.5" BKR ZXP PACKER, fD = 4.82" 6769'
Seal Assemby from LEM#1 6942-6945
L2 8KR HUGHES HOOK HGR, O = 5.62" 6$44"
7-518" x 5.5" BKR ZXP PACKER. ID = 4.82" 6907'
RA TAG 7005'
7-5l8" 29.7# L-80 BTGM!STL(6.875"ID)-MB 7291'
4.5" 12.6# L-80 BTC Slotted (3.958° ~) 7286-7717'
4" x 6.4" Sw eA Packer 3.9" ~ 7777'-7787'
4.5" 12.6# L-80 BTC Slotted (3.958" ~) 7842-1061T
4.5" 12.6# L-80 BTGIBT Sbtted/Solid Liner
Shoe - L1 - Olxt 10619'
~ ~
~ ~`
f"
~ ~
i
~ ~
~ ~
U
ST MD ND DEV TYPE VLV LATCH PORT DATE
4 3054 2487 57 KBG-2 DMY BK 1" 02/18/06
3 5148 3559 58 KBG-2 OMY BK 1" 02/18!06
2 6072 4041 61 KBG-2 DMY BK 1" 02/18/06
1 6264 4133 60 KBG-2 DCK2 BEK 1" 02/18/06
6382' 4.5" Baker CMD-BX Sliding Sbeve, 3.812" ~
6428' 7.625" x 4.5" Premier Packer 3.87" D
6455' 4.5" HES X nipple W/ RHGM Plug, ~ 3.813"
6476' 4.5" HES X nipple, ID 3.813"
6504' 4.5" Guide Shoe
6560'-6566' Hookw all Hanger below window - 3.99" ID - L4
6598'-6608' 4" x 6.4" Sw eA Packer 3.9" ID - L4
6622'-7320' 4.5" L-80 12.6# BTC Slotted Liner 3.958" ~ - L4
7337'-7349' 4" x 6.4" Swell Packer 3.9" ~ - L4
7395'-10533' 4.5" L-8012.6# BTC Slotted Liner 3.958" ID - L4
10575' 4.5" 12.6# L-$0 ~T-M shoe (10,574' PBTD) - L4
~
.~---s ^-------
6744'-6750' Hookw all Hanger below window - 3.99" ID - L3
6784'-6796' 4" x 6.4" Swell Packer 3.9" ID - L3
6810'-7183' 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID - L3
7211-7222 4" x 6.4" Swell Packer 3.9" ID - L3
7246-10534 4.5" L-80 12.6# BTC Slotted Liner 3.958° ID - L3
10576' 4.5" 12.6# L-80 PT-M shoe (10,574' PBTD) - L3
6844-6850 Hookw all Hanger below window - 3.99" D - L2
6881-6891 4" x 6.4" Swell Packer 3.9" ~ - L2
6921-10544 4.5" L-80 12.6# BTC Slotted Liner 3.958° ~ - L2
10590' 4.5" 12.6# L-80 BT-M shoe (10,588' PBTD) - L2
aar -~-
7690'
7732'-7745'
7757'-8289'
8306'-8316'
8333'-10616
10620'
Weatherford Fbw Through Aluminum BiNet
(partialy milled w hte drilling L1) - MB OBc
4" x 6.4" Swell Packer 3.9" ~ - M8 OBc
4.5" 12.6# L-80 BT soNd (3.958" ID) - MB OBc
4" x 6.4" Swell Packer 3.9" ID - MB OBc
4.5" 12.6# L-80 BTC sbtted (3.958" D) - MB OBc
4.5" 12.6# L-80 BT shoe (10617' PBTD) -MB-Obc
ORION LRJ(T
WELL: V-203, Lt, L2, L3, L4
PERMIT No: 205-168 (169) (170) (171) (172)
API No: 50-029-23285-00 (60) (61) (62) (63)
SCE 11, T11N, R11E, 4801' NSL & 1920' Wa
BP Exploration (Alaska)
GATE REV BY COMMENTS DATE REV BY C,OMINB~lTS
02/18/O6 jdf ORIGINAL COMPLETION 02/16(06
~'
~~
SCHLUMBERGER
Survey report
Client ...................: BP Exploration (Alaska) Inc.
Field ....................: Orion
Well .....................: V-203L3
API number ...............: 50-029-2328-62
Engineer .................: St. Amour
Rig :...................... Nabors 9ES
STATE :...................: Alaska
----- Survey calculation methods-------------
Method for positions.....: Minimum curvature
Method for DLS...........: Mason & Taylor
----- Depth reference -----------------------
Permanent datum..........: Mean Sea Level
Depth reference..........: Driller's Pipe Tally
GL above permanent.......: 52.70 ft
KB above permanent.......: N/A (TopDrive)
DF above permanent.......: 81.20 ft
----- Vertical section origin----------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: -999.25 ft
Departure (+E/W-)........: -999.25 ft
Azimuth from Vsect Origin to target: 20.00 degrees
5-Feb-2006 09:20:14 Page 1 of 8
Spud date ................: 8-Jan-06
Last survey date.........: 05-Feb-06
Total accepted surveys...: 201
MD of first survey.......: 0.00 ft
MD of last survey........: 10595.00 ft
----- Geomagnetic data ----------------------
Magnetic model...........: BGGM version 2005
Magnetic date ............: 21-Jan-2006
Magnetic field strength..: 1151.60 HCNT
Magnetic dec (+E/W-)...... 24.37 degrees
Magnetic dip .............: 80.84 degrees
----- MWD survey Reference
Reference G ..............:
Reference H ..............:
Reference Dip .............
Tolerance of G...........:
Tolerance of H...........:
Tolerance of Dip.........:
Criteria ---------
1002.68 meal
1151.60 HCNT
80.84 degrees
(+/-) 2.50 meal
(+/-) 6.00 HCNT
(+/-) 0.45 degrees
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: 24.37 degrees
Grid convergence (+E/w-).: 0.00 degrees
Total az corr (+E/W-)....: 24.37 degrees
(Total az corr = magnetic dec - grid conv)
Survey Correction Type ....
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
i
•
SCHLUMBERGER Survey Report
5-Feb-2006 09:20:14
Page 2 of 8
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None
2 54.00 0.25 326.00 54.00 54.00 0.07 0.10 -0.07 0.12 326.00 0.46 BP_CB GYRO SS
3 162.00 0.50 115.00 108.00 162.00 0.17 0.09 0.23 0.25 67.75 0.67 BP_CB GYRO SS
4 256.00 3.00 137.00 94.00 255.95 -0.99 -1.88 2.28 2.95 129.50 2.71 BP_CB GYRO SS
5 349.00 3.50 143.00 93.00 348.80 -3.64 -5.93 5.65 8.19 136.38 0.65 BP CB GYRO SS
6 441.00 3.25 150.00 92.00 440.64 -6.84 -10.43 8.64 13.54 140.35 0.52 BP_CB GYRO SS
7 532.00 2.75 179.00 91.00 531.52 -10.54 -14.84 9.97 17.88 146.11 1.73 BP_CB GYRO SS
8 572.65 2.65 201.89 40.65 572.13 -12.39 -16.69 9.64 19.27 150.00 2.65 BP_MWD+IFR+MS
9 665.37 3.57 243.08 92.72 664.72 -16.64 -19.99 6.26 20.95 162.60 2.54 BP_MWD+IFR+MS
10 757.12 3.64 275.25 91.75 756.30 -19.47 -21.01 0.81 21.03 177.78 2.18 BP MWD+IFR+MS
11 808.00 4.00 273.50 50.88 807.06 -20.38 -20.76 -2.57
12 880.93 4.70 284.35 72.93 879.78 -21.40 -19.86 -8.00
13 942.02 5.34 292.23 61.09 940.64 -21.54 -18.17 -13.06
14 1035.95 8.34 301.48 93.93 1033.89 -20.01 -12.95 -22.91
15 1129.14 11.32 305.21 93.19 1125.71 -16.26 -4.15 -36.15
16 1220.42 15.05 306.44 91.28 1214.56 -10.56
17 1312.85 19.18 304.31 92.43 1302.88 -3.41
18 1406.18 22.33 303.92 93.33 1390.15 4.65
19 1499.98 28.05 305.47 93.80 1474.99 14.83
20 1593.47 31.72 301.62 93.49 1556.04 25.65
21 1689.37 31.97 302.09 95.90 1637.51 36.04
22 1782.55 33.40 301.71 93.18 1715.93 46.42
23 1875.33 34.45 304.35 92.78 1792.92 58.10
24 1969.24 37.94 304.82 93.91 1868.69 72.07
25 2061.85 42.21 305.46 92.61 1939.54 87.66
26 2155.32 47.01 305.75 93.47 2006.07 105.32
27 2248.06 51.56 305.07 92.74 2066.54 123.98
28 2341.42 56.07 304.38 93.36 2121.65 143.11
29 2435.00 59.07 304.54 93.58 2171.83 162.83
30 2529.21 59.08 304.99 94.21 2220.24 183.43
8.06 -53.01
23.75 -75.22
42.29 -102.60
65.05 -135.38
90.71 -174.22
117.41 -217.20
144.00 -259.92
172.23 -303.32
203.71 -348.96
238.03 -397.69
276.24 -451.04
316.95 -508.33
359.85 -570.25
404.54 -635.37
450.62 -701.76
20.92 187.04
21.41 201.94
22.37 215.70
26.32 240.52
36.39 263.45
53.62 278.64
78.88 287.53
110.98 292.40
150.20 295.67
196.42 297.50
246.90 298.39
297.14 298.99
348.80 299.59
404.07 300.28
463.49 300.90
528.92 301.49
599.04 301.94
674.30 302.25
753.22 .302.49
833.98 302.71
0.74 BP_CB GYRO SS
1.48 BP_MWD+IFR+MS
1.54 BP_MWD+IFR+MS
3.39 BP_MWD+IFR+MS
3.27 BP_MWD+IFR+MS
4.10 BP_MWD+IFR+MS
4.52 BP_MWD+IFR+MS
3.38 BP_MWD+IFR+MS
6.14 BP_MWD+IFR+MS
4.43 BP_MWD+IFR+MS
0.37 BP_MWD+IFR+MS
1.55 BP_MWD+IFR+MS
1.95 BP_MWD+IFR+MS
3.73 BP_MWD+IFR+MS
4.63 BP MWD+IFR+MS
5.14 BP_MWD+IFR+MS
4.94 BP_MWD+IFR+MS
4.87 BP_MWD+IFR+MS
3.21 BP_MWD+IFR+MS
0.41 BP MWD+IFR+MS
•
SCHLUMBERGER Survey Report
5-Feb-2006 09:20:14
Page 3 of 8
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
---
31 --------
2623.51 ------
58.33 -------
305.29 ------
94.30 --------
2269.23 --------
204.48 -------
497.00 ---------
-767.65 -------
914.49 --------
302.92 -----
0.84 -
BP ---- ------
_MWD+IFR+MS
32 2716.98 59.27 305.21 93.47 2317.65 225.50 543.14 -832.94 994.38 303.11 1.01 BP _MWD+IFR+MS
33 2809.27 59.23 305.86 92.29 2364.84 246.75 589.24 -897.49 1073.63 303.29 0.61 BP _MWD+IFR+MS
34 2903.69 60.37 304.93 94.42 2412.33 268.41 636.50 -964.01 1155.18 303.44 1.48 BP _MWD+IFR+MS
35 2997.80 60.19 304.36 94.11 2458.99 289.07 682.97 -1031.25 1236.90 303.52 0.56 BP MWD+IFR+MS
36 3090.94 60.53 302.57 93.14 2505.05 307.92 727.60 -1098.78 1317.84 303.51 1.71 BP _MWD+IFR+MS
37 3184.76 59.75 303.25 93.82 2551.76 326.09 771.81 -1167.08 1399.20 303.48 1.04 BP _MWD+IFR+MS
38 3277.97 59.38 301.47 93.21 2598.98 343.30 814.82 -1234.96 1479.55 303.42 1.69 BP _MWD+IFR+MS
39 3370.51 59.75 300.94 92.54 2645.86 358.80 856.16 -1303.21 1559.28 303.30 0.64 BP _MWD+IFR+MS
40 3478.73 58.70 300.75 108.22 2701.23 376.30 903.83 -1383.04 1652.18 303.17 0.98 BP MWD+IFR+MS
41 3510.56 58.60 301.04 31.83 2717.79 381.43 917.79 -1406.36 1679.34 303.13 0.84 BP _MWD+IFR+MS
42 3606.00 58.42 300.44 95.44 2767.65 396.60 959.39 -1476.31 1760.66 303.02 0.57 BP _MWD+IFR+MS
43 3701.64 59.05 300.75 95.64 2817.28 411.63 1001.00 -1546.68 1842.34 302.91 0.71 BP _MWD+IFR+MS
44 3797.08 58.65 301.14 95.44 2866.65 427.14 1043.00 -1616.73 1923.97 302.83 0.55 BP _MWD+IFR+MS
45 3892.71 58.77 300.79 95.63 2916.32 442.68 1085.04 -1686.81 2005.65 302.75 0.34 BP MWD+IFR+MS
46 3987.85 58.28 301.49 95.14 2965.99 458.36 1127.00 -1756.26 2086.76 302.69 0.81 BP _MWD+IFR+MS
47 4083.32 59.05 302.98 95.47 3015.64 475.64 1170.50 -1825.23 2168.30 302.67 1.56 BP _MWD+IFR+MS
48 4179.27 58.77 302.83 95.95 3065.19 494.00 1215.14 -1894.21 2250.47 302.68 0.32 BP _MWD+IFR+MS
49 4275.30 59.57 303.12 96.03 3114.41 512.51 1260.02 -1963.39 2332.92 302.69 0.'87 BP _MWD+IFR+MS
50 4367.74 59.02 302.44 92.44 3161.61 530.09 1303.05 -2030.21 2412.40 302.69 0.87 BP MWD+IFR+MS
51 4460.44 59.45 302.67 92.70 3209.02 547.41 1345.91 -2097.35 2492.06 302.69 0.51 BP _MWD+IFR+MS
52 4553.88 59.69 301.71 93.44 3256.35 564.42 1388.83 -2165.53 2572.62 302.67 0.92 BP _MWD+IFR+MS
53 4647.31 59.55 301.12 93.43 3303.60 580.37 1430.84 -2234.32 2653.20 302.64 0.57 BP _MWD+IFR+MS
54 4741.41 59.20 301.17 94.10 3351.54 596.02 1472.72 -2303.62 2734.15 302.59 0.37 BP _MWD+IFR+MS
55 4834.50 58.61 302.36 93.09 3399.62 612.27 1514.69 -2371.39 2813.85 302.57 1.26 BP MWD+IFR+MS
56 4928.48 59.37 301.78 93.98 3448.03 629.12 1557.45 -2439.65 2894.40 302.55 0.97 BP _MWD+IFR+MS
57 5021.57 59.92 302.05 93.09 3495.08 645.70 1599.92 -2507.83 2974.72 302.54 0.64 BP _MWD+IFR+MS
58 5115.51 59.04 302.45 93.94 3542.78 662.87 1643.10 -2576.27 3055.64 302.53 1.01 BP _MWD+IFR+MS
59 5208.87 58.57 302.45 93.36 3591.14 680.09 1685.95 -2643.67 3135.51 302.53 0.50 BP _MWD+IFR+MS
60 5302.94 58.31 303.02 94.07 3640.38 697.76 1729.29 -2711.09 3215.66 302.53 0.59 BP MWD+IFR+MS
f
•
SCHLUMBERGER Survey Report
5-Feb-2006 09:20:14
Page 4 of 8
---
---
Seq --------
--------
Measured ------
------
Incl -------
-------
Azimuth ------
------
Course --------
--------
TVD --------
--------
Vertical -------
-------
Displ ---------
---------
Displ -------
-------
Total --------
--------
At -----
-----
DLS ----- ------
----- ------
Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
-
--- (ft)
-------- (deg)
------ (deg)
------- (ft)
------ (ft)
-------- (ft)
-------- (ft)
------- (ft)
--------- (ft)
------- (deg)
-------- 100f)
-----
- type (deg)
---- ------
---
61 --------
5396.30 ------
57.47 -------
304.77 ------
93.36 --------
3690.00 --------
716.74 -------
1773.38 ---------
-2776.73 -------
3294.71 --------
302.56 -----
1.82 -
BP ---- ------
_MWD+IFR+MS
62 5489.49 57.42 .309.34 93.19 3740.17 739.77 1820.70 -2839.39 3372.99 302.67 4.13 BP _MWD+IFR+MS
63 5581.52 57.23 313.54 92.03 3789.87 768.07 1871.95 -2897.44 3449.54 302.87 3.85 BP _MWD+IFR+MS
64 5675.08 59.29 315.98 93.56 3839.09 801.40 1927.98 -2953.92 3527.42 303.13 3.13 BP _MWD+IFR+MS
65 5767.56 59.11 318.54 92.48 3886.45 837.78 1986.31 -3007.82 3604.50 303.44 2.39 BP MWD+IFR+MS
66 5861.46 58.95 322.80 93.90 3934.79 878.84 2048.56 -3058.84 3681.45 303.81 3.89 BP _MWD+IFR+MS
67 5953.39 59.00 325.43 91.93 3982.17 923.01 2112.38 -3105.01 3755.43 304.23 2.45 BP _MWD+IFR+MS
68 6046.33 60.44 330.23 92.94 4029.06 972.24 2180.30 -3147.70 3829.06 304.71 4.72 BP _MWD+IFR+MS
69 6139.37 62.62 334.67 93.04 4073.42 1027.44 2252.80 -3185.48 3901.59 305.27 4.80 BP _MWD+IFR+MS
70 6233.23 60.79 339.10 93.86 4117.93 1087.73 2328.77 -3217.94 3972.19 305.89 4.59 BP MWD+IFR+MS
71 6326.47 59.19 341.69 93.24 4164.57 1149.91 2404.81 -3245.04 4038.99 306.54 2.95 BP _MWD+IFR+MS
72 6419.24 58.90 346.89 92.77 4212.31 1214.47 2481.35 -3266.58 4102.15 307.22 4.82 BP _MWD+IFR+MS
73 6512.05 60.93 350.24 92.81 4258.84 1282.99 2560.05 -3282.47 4162.75 307.95 3.81 BP _MWD+IFR+MS
74 6604.80 62.91 355.08 92.75 4302.52 1355.66 2641.18 -3292.89 4221.25 308.73 5.07 BP _MWD+IFR+MS
75 6698.56 65.73 357.97 93.76 4343.15 1433.16 2725.50 -3297.98 4278.44 309.57 4.09 BP MWD+IFR+MS
76 6732.00 66.20 359.19 33.44 4356.77 1461.59 2756.03 -3298.74 4298.53 309.88 3.62 BP _BLIND
77 6744.00 68.10 358.89 12.00 4361.43 1471.91 2767.09 -3298.92 4305.77 309.99 16.00 BP _BLIND
78 6760.12 67.88 359.85 16.12 4367.47 1485.90 2782.03 -3299.09 4315.52 310.14 5.69 BP _BLIND
79 6791.28 69.88 1.66 31.16 4378.70 1513.34 2811.09 -3298.70 4334.01 310.44 8.40 BP _BLIND
80 6820.99 72.77 3.34 29.71 4388.21 1540.18 2839.21 -3297.47 4351.37 310.73 11.10 BP BLIND
81 6852.71 76.03 5.10 31.72 4396.74 1569.58 2869.67 -3295.22 4369.61 311.05 11.58 BP _BLIND
82 6884.37 79.06 6.81 31.66 4403.57 1599.56 2900.41 -3292.01 4387.45 311.38 10.93 BP _BLIND
83 6914.09 82.82 8.34 29.72 4408.25 1628.22 2929.50 -3288.14 4403.84 311.70 13.63 BP _BLIND
84 6945.34 85.46 10.03 31.25 4411.44 1658.75 2960.18 -3283.18 4420.63 312.04 10.02 BP _BLIND
85 6976.97 88.81 11.67 31.63 4413.02 1689.93 2991.20 -3277.23 4437.07 312.39 11.79 BP BLIND
86 7008.28 89.85 13.30 31.31 4413.38 1720.97 3021.77 -3270.46 4452.76 312.74 6.18 BP _MWD+IFR+MS
87 7040.30 92.45 12.88 32.02 4412.74 1752.75 3052.95 -3263.21 4468.68 313.09 8.23 BP _MWD+IFR+MS
88 7071.63 95.49 14.45 31.33 4410.57 1783.81 3083.32 -3255.83 4484.11 313.44 10.91 BP _BLIND
89 7103.21 96.70 15.21 31.58 4407.22 1815.08 3113.67 -3247.80 4499.23 313.79 4.52 BP _MWD+IFR+MS
90 7135.28 96.56 16.26 32.07 4403.52 1846.85 3144.33 -3239.16 4514.31 314.15 3.28 BP MWD+IFR+MS
f
•
~ s
SCHLUMBERGER Survey Report
5-Feb-2006 09:20:14
Page 5 of 8
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
91 7166.93 96.98 17.38 31.65 4399.79 1878.23 3174.42 -3230.06 4528.82 314.50 3.76 BP _MWD+IFR+MS
92 7198.30 98.71 15.96 31.37 4395.50 1909.25 3204.18 -3221.15 4543.41 314.85 7.11 BP _MWD+IFR+MS
93 7228.92 100.40 12.57 30.62 4390.42 1939.29 3233.44 -3213.71 4558.84 315.18 12.23 BP _MWD+IFR+MS
94 7257.84 100.08 13.25 28.92 4385.28 1967.53 3261.18 -3207.35 4574.10 315.48 2.56 BP MWD+IFR+MS
95 7258.57 98.69 10.27 30.73 4380.27 1997.53 3290.86 -3201.17 4591.00 315.79 10.58 BP _
MWD+IFR+MS
96 7320.21 98.93 11.42 31.64 4375.42 2028.40 3321.57 -3195.29 4608.98 316.11 3.67 BP _MWD+IFR+MS
97 7352.74 96.74 10.12 32.53 4370.99 2060.21 3353.22 -3189.27 46.27.69 316.44 7.81 BP _MWD+IFR+MS
98 7384.41 95.06 9.48 31.67 4367.73 2091.21 3384.26 -3183.91 4646.56 316.75 5.67 BP _MWD+IFR+MS
99 7415.51 92.96 8.84 31.10 4365.56 2121.68 3414.89 -3178.97 4665.55 317.05 7.06 BP _MWD+IFR+MS
100 7446.61 90.14 8.81 31.10 4364.71 2152.17 3445.61 -3174.20 4684.84 317.35 9.07 BP MWD+IFR+MS
101 7477.85 88.12 9.78 31.24 4365.19 2182.86 3476.43 -3169.15 4704.16 317.65 7.17 BP _MWD+IFR+MS
102 7509.53 88.79 11.85 31.68 4366.04 2214.12 3507.54 -3163.21 4723.21 317.95 6.87 BP MWD+IFR+MS
103 7540.15 89.84 12.52 30.62 4366.41 2244.46 3537.46 -3156.75 4741.17 318.26 4.07 BP _
_MWD+IFR+MS
104 7571.02 90.91 11.11 30.87 4366.21 2275.01 3567.68 -3150.43 4759.57 318.55 5.73 BP _MWD+IFR+MS
105 7602.25 90.13 12.76 31.23 4365.92 2305.93 3598.23 -3143.97 4778.27 318.85 5.84 BP MWD+IFR+MS
106 7633.20 88.69 13.77 30.95 4366.24 2336.66 3628.35 -3136.87 4796:34 319.16 5.68 BP _MWD+IFR+MS
107 7665.22 87.99 16.60 32.02 4367.17 2368.55 3659.24 -3128.49 4814.30 319.47 9.10 BP MWD+IFR+MS
108 7696.42 88.56 18.20 31.20 4365.11 2399.71 3689.00 -3119.16 4830.93 319.78 5.44 BP _
MWD+IFR+MS
109 7728.05 89.21 19.49 31.63 4368.73 2431.32 3718.92 -3108.95 4847.26 320.11 4.57 BP _
MWD+IFR+MS
110 7758.01 89.88 19.25 29.96 4368.96 2461.28 3747.19 -3099.01 4862.64 320.41 2.38 BP _
MWD+IFR+MS
111 7789.54 89.53 19.95 31.53 4369.13 2492.81 3776.89 -3088.43 4878.86 320.73 2.48 BP _MWD+IFR+MS
112 7820.36 87.74 20.73 30.82 4369.86 2523.62 3805.78 -3077.73 4894.52 321.04 6.34 BP MWD+IFR+MS
113 7851.72 87.35 22.33 31.36 4371.20 2554.94 3834.92 -3066.23 4910.03 321.36 5.25 BP _
MWD+IFR+MS
114 7882.56 88.22 23.33 30.84 4372.40 2585.71 3863.32 -3054.27 4924.82 321.67 4.30 BP _
_MWD+IFR+MS
115 7911.96 88.98 23.86 29.40 4373.11 2615.05 3890.26 -3042.51 4938.72 321.97 3.15 BP MWD+IFR+MS
116 7943.41 89.46 23.91 31.45 4373.54 2646.42 3919.01 -3029.77 4953.60 322.29 1.53 BP MWD+IFR+MS
117 7974.32 90.73 23.65 30.91 4373.49 2677.26 3947.30 -3017.31 4968.43 322.61 4.19 BP _
MWD+IFR+MS
118 8006.05 88.63 23.04 31.73 4373.67 2708.94 3976.43 -3004.74 4984.02 322.92 6.89 BP _
_MWD+IFR+MS
119 8036.55 87.19 21.98 30.50 4374.78 2739.39 4004.58 -2993.07 4999.51 323.23 5.86 BP MWD+IFR+MS
120 8066.73 87.16 21.07 30.18 4376.27 2769.52 4032.62 -2982.01 5015.42 323.52 3.01 BP _
MWD+IFR+MS
•
•
SCHLUMBERGER Survey Report
5-Feb-2006 09:20:14
Page 6 of 8
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (f t) (deg) 100f) type (deg)
121 8097.91 88.08 21.64 31.18 4377.56 2800.66 4061.64 -2970.67 5032.07 323.82 3.47 BP _MWD+IFR+MS
122 8128.94 88.39 22.41 31.03 4378.52 2831.66 4090.39 -2959.03 5048.48 324.12 2.67 BP _MWD+IFR+MS
123 8159.33 88.72 23.13 30.39 4379.28 2862.00 4118.40 -2947.28 5064.35 324.41 2.61 BP _MWD+IFR+MS
124 8190.95 87.62 21.82 31.62 4380.29 2893.58 4147.60 -2935.19 5081.14 324.71 5.41 BP MWD+IFR+MS
125 8221.67 88.22 21.67 30.72 4381.41 2924.26 4176.12 -2923.82 5097.91 325.00 2.01 BP _
MWD+IFR+MS
126 8252.58 88.54 22.17 30.91 4382.28 2955.14 4204.78 -2912.29 5114.84 325.29 1.92 BP MWD+IFR+MS
127 8283.97 88.71 21.69 31.39 4383.04 2986.51 4233.89 -2900.57 5132.17 325.59 1.62 BP _
MWD+IFR+MS
128 8314.90 87.43 21.31 30.93 4384.08 3017.41 4262.65 -2889.24 5149.55 325.87 4.32 BP _
MWD+IFR+MS
129. 8345.68 85.46 20.90 30.78 4385.99 3048.12 4291.31 -2878.18 5167.13 326.15 6.54 BP _
MWD+IFR+MS
130 8376.19 85.10 21.55 30.51 4388.50 3078.52 4319.66 -2867.17 5184.60 326.43 2.43 BP _
MWD+IFR+MS
131 8406.87 84.84 21.23 30.68 4391.19 3109.07 4348.11 -2856.02 5202.21 326.70 1.34 BP MWD+IFR+MS
132 8438.66 86.80 24.04 31.79 4393.50 3140.74 4377.37 -2843.82 5220.03 326.99 10.76 BP _
MWD+IFR+MS
133 8469.72 87.74 24.11 31.06 4394.98 3171.69 4405.70 -2831.17 5236.95 327.27 3.03 BP _
MWD+IFR+MS
134 8500.86 87.13 23.59 31.14 4396.38 3202.72 4434.15 -2818.59 5254.15 327.56 2.57 BP _
MWD+IFR+MS
135 8531.60 86.00 22.76 30.74 4398.22 3233.36 4462.36 -2806.51 5271.54 327.83 4.56 BP _
MWD+IFR+MS
136 8562.74 87.90 23.05 31.14 4399.88 3264.42 4491.00 -2794.41 5289.40 328.11 6.17 BP MWD+IFR+MS
137 8593.67 89.49 23.00 30.93 4400.58 3295.29 4519.46 -2782.31 5307.24 328.38 5.14 BP ^MWD+IFR+MS
138 8624.89 89.07 23.20 31.22 4400.97 3326.46 4548.17 -2770.07 5325.33 328.66 1.49 BP MWD+IFR+MS
139 8656.50 88.26 22.42 31.61 4401.71 3358.03 4577.30 -2757.82 5343.90 328.93 3.56 BP ^MWD+IFR+MS
140 8687.28 88.09 21.99 30.78 4402.69 3388.77 4605.78 -2746.19 5362.35 329.19 1.50 BP _
MWD+IFR+MS
141 8718.88 88.22 21.75 31.60 4403.71 3420.34 4635.09 -2734.42 5381.56 329.46 0.86 BP MWD+IFR+MS
142 8749.04 88.10 21.33 30.16 4404.67 3450.47 4663.13 -2723.36 5400.14 329.71 1.45 BP _
MWD+IFR+MS
143 8780.35 89.54 21.60 31.31 4405.32 3481.76 4692.26 -2711.90 5419.57 329.97 4.68 BP _
MWD+IFR+MS
144 8811.47 90.80 21.34 31.12 4405.23 3512.87 4721.22 -2700.51 5439.00 330.23 4.13 BP _
MWD+IFR+MS
145 8841.85 90.14 21.42 30.38 .4404.98 3543.24 4749.51 -2689.44 5458.11 330.48 2.19 BP _
MWD+IFR+MS
146 8872.86 91.66 23.14 31.01 4404.49 3574.22 4778.20 -2677.68 5477.33 330.73 7.40 BP MWD+IFR+MS
147 8904.13 89.42 22.53 31.27 4404.20 3605.45 4807.02 -2665.55 5496.60 330.99 7.42 BP _
MWD+IFR+MS
148 8934.82 88.83 22.58 30.69 4404.66 3636.10 4835.36 -2653.78 5515.72 331.24 1.93 BP ~MWD+IFR+MS
149 8966.07 89.74 23.48 31.25 4405.05 3667.31 4864.11 -2641.55 5535.11 331.50 4.10 BP MWD+IFR+MS
150 8997.52 88.85 22.39 31.45 4405.44 3698.71 4893.07 -2629.30 5554.76 331.75 4.47 _
BP MWD+IFR+MS
•
•
. .
SCHLUMBERGER Survey Report
5-Feb-2006 09:20:14
Page 7 of 8
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
151 9028.54 89.32 22.83 31.02 4405.94 3729.70 4921.71 -2617.38 5574.39 332.00 2.08 BP MWD+IFR+MS
152 9059.43 89.10 21.96 30.89 4406.36 3760.55 4950.26 -2605.61 5594.13 332.24 2.90 BP _
MWD+IFR+MS
153 9090.79 88.61 21.53 31.36 4406.99 3791.89 4979.39 -2593.99 5614.54 332.48 2.08 BP _
_MWD+IFR+MS
154 9122.38 88.78 21.18 31.59 4407.71 3823.47 5008.80 -2582.49 5635.36 332.72 1.23 BP MWD+IFR+MS
155 9153.39 89.08 21.59 31.01 4408.29 3854.46 5037.67 -2571.19 5655.89 332.96 1.64 BP _
MWD+IFR+MS
156 9184.14 89.80 21.82 30.75 4408.59 3885.20 5066.24 -2559.82 5676.21 333.19 2.46 BP MWD+IFR+MS
157 9215.89 89.59 21.46 31.75 4408.76 3916.93 5095.75 -2548.11 5697.32 333.43 1.31 BP _
MWD+IFR+MS
158 9247.45 89.07 20.80 31.56 4409.13 3948.49 5125.19 -2536.73 5718.61 333.67 2.66 BP _
_MWD+IFR+MS
159 9278.41 89.82 20.53 30.96 4409.43 3979.44 5154.15 -2525.81 5739.77 333.89 2.57 BP MWD+IFR+MS
160 9309.90 89.22 21.65 31.49 4409.69 4010.92 5183.53 -2514.47 5761.21 334.12 4.03 BP _
MWD+IFR+MS
161 9341.07 88.83 22.89 31.17 4'41U.2L 4042.07 5212.37 -2502.66 5782.05 334.35 4.17 BP _MWD+IFR+MS
162 9371.79 89.60 23.09 30.72 4410.64 4072.74 5240.65 -2490.67 5802.40 334.58 2.59 BP MWD+IFR+MS
163 9403.82 90.27 23.47 32.03 4410.68 4104.72 5270.07 -2478.01 5823.59 334.82 2.40 BP _
MWD+IFR+MS
164 9434.70 89.51 22.59 30.88 4410.74 4135.55 5298.49 -2465.93 5844.21 335.04 3.77 BP _
MWD+IFR+MS
165 9466.16 89.26 22.39 31.46 4411.07 4166.98 5327.55 -2453.89 5865.53 335.27 1.02 BP _
MWD+IFR+MS
166 9496.70 89.85 22.16 30.54 4411.31 4197.50 5355.81 -2442.32 5886.40 335.49 2.07 BP MWD+IFR+MS
167 9527.98 89.84 22.03 31.28 4411.40 4228.76 5384.80 -2430.55 5907.93 335.71 0.42 BP _
MWD+IFR+MS
168 9559.08 90.38 20.63 31.10 4411.34 4259.85 5413.77 -2419.24 5929.72 335.92 4.82 BP _
_MWD+IFR+MS
169 9590.59 89.77 20.53 31.51 4411.30 4291.35 5443.26 -2408.16 5952.17 336.13 1.96 BP MWD+IFR+MS
170 9621.36 90.75 21.39 30.77 4411.16 4322.12 5472.00 -2397.16 5974.04 336.34 4.24 BP _
MWD+IFR+MS
171 9652.34 92.12 21.68 30.98 4410.38 4353.08 5500.80 -2385.79 5995.90 336.55 4.52 BP MWD+IFR+MS
172 9683.85 93.15 21.36 31.51 4408.93 4384.54 5530.09 -2374.24 6018.21 336.76 3.42 BP _
MWD+IFR+MS
173 9715.03 94.17 21.37 31.18 4406.94 4415.65 5559.06 -2362.91 6040.41 336.97 3.27 BP _
MWD+IFR+MS
174 9746.27 92.47 21.67 31.24 4405.13 4446.82 5588.08 -2351.47 6062.67 337.18 5.53 BP _
MWD+IFR+MS
175 9777.91 91.66 22.11 31.64 4403.99 4478.43 5617.42 -2339.68 6085.18 337.39 2.91 BP _
MWD+IFR+MS
176 9809.21 90.61 23.04 31.30 4403.37 4509.69 5646.31 -2327.67 6107.28 337.60 4.48 BP MWD+IFR+MS
177 9840.44 89.74 22.50 31.23 4403.28 4540.88 5675.11 -2315.58 6129.33 337.80 3.28 BP _
MWD+IFR+MS
178 9871.60 89.67 22.46 31.16 4403.44 4572.01 5703.90 -2303.67 6151.53 338.01 0.26 BP _
MWD+IFR+MS
179 9902.67 90.62 22.63 31.07 4403.36 4603.05 5732.59 -2291.75 6173.72 338.21 3.11 BP _
MWD+IFR+MS
180 9933.62 89.63 22.79 30.95 4403.29 4633.97 5761.14 -2279.80 6195.83 338.41 3.24 BP _
MWD+IFR+MS
•
•
r ~
SCHLUMBERGER Survey Report 5-Feb-2006 09:20:14 Page 8 of 8
---
---
Seq --------
--------
Measured ------
------
Incl -------
-------
Azimuth ------
------
Course --------
--------
TVD --------
--------
Vertical -------
-------
Displ ---------
---------
Displ -------
-------
Total --------
--------
At -----
-----
DLS -
- ---- ------
---- ------
Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
181 9964.17 88.10 21.66 30.55 4403.90 4664.48 5789.42 -2268.25 6217.90 338.61 6.23 BP _MWD+IFR+MS
182 9995.72 88.59 22.09 31.55 4404.81 4696.00 5818.68 -2256.50 6240.90 338.80 2.07 BP _MWD+IFR+MS
183 10026.63 89.21 22.35 30.91 4405.40 4726.89 5847.29 -2244.82 6263.39 339.00 2.17 BP _MWD+IFR+MS
184 10058.21 87.55 21.69 31.58 4406.29 4758.43 5876.56 -2232.98 6286.50 339.19 5.66 BP _MWD+IFR+MS
185 10088.98 86.83 20.65 30.77 4407.80 4789.16 5905.21 -2221.88 6309.38 339.38 4.11 BP MWD+IFR+MS
186 10120.27 87.73 21.12 31.29 4409.29 4820.41 5934.41 -2210.74 6332.82 339.57 3.24 BP _MWD+IFR+MS
187 10152.03 88.07 22.11 31.76 4410.45 4852.13 5963.92 -21.99.05 6356.43 339.76 3.29 BP _MWD+IFR+MS
188 10183.27 89.06 22.60 31.24 4411.23 4883.34 5992.80 -2187.17 6379.45 339.95 3.54 BP _MWD+IFR+MS
189 10214.06 90.27 24.02 30.79 4411.41 4914.07 6021.08 -2174.99 6401.87 340.14 6.06 BP _MWD+IFR+MS
190 10245.85 89.23 22.91 31.79 4411.55 4945.80 6050.24 -2162.33 6425.03 340.33 4.78 BP MWD+IFR+MS
191 10276.13 88.12 21.92 30.28 4412.25 4976.05 6078.22 -2150.79 6447.53 340.51 4.91 BP _MWD+IFR+MS
192 10307.42 88.70 22.51 31.29 4413.12 5007.30 6107.18 -2138.96 6470.92 340.70 2.64 BP _MWD+IFR+MS
193 10339.41 89.17 23.06 31.99 4413.71 5039.25 6136.67 -2126.57 6494.69 340.89 2.26 BP _MWD+IFR+MS
194 10370.58 89.74 23.30 31.17 4414.01 5070.37 6165.32 -2114.31 6517.78 341.07 1.98 BP _MWD+IFR+MS
195 10401.59 90.14 22.41 31.01 4414.04 5101.34 6193.89 -2102.26 6540.94 341.25 3.15 BP MWD+IFR+MS
196 10431.89 91.05 23.23 30.30 4413.73 5131.60 6221.82 -2090.51 6563.63 341.43 4.04 BP _MWD+IFR+MS
197 10463.04 91.69 23.00 31.15 4412.98 5162.70 6250.46 -2078.29 6586.92 341.61 2.18 BP _MWD+IFR+MS
198 10494.41 91.32 21.92 31.37 4412.16 5194.03 6279.44 -2066.31 6610.67 341.79 3.64 BP _MWD+IFR+MS
199 10524.85 90.28 19.83 30.44 4411.74 5224.46 6307.88 -2055.46 6634.32 341.95 7.67 BP _MWD+IFR+MS
200 10548.74 89.65 19.81 23.89 4411.75 5248.35 6330.35 -2047.36 6653.20 342.08 2.64 BP MWD+IFR+MS
201 10595.00 89.65 19.81 46.26 4412.03 5294.61 6373.88 -2031.68 6689.84 342.32 0.00 Pr ojected to TD
• ~
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: AOGCC -Librarian
Well No V-203L3 Date Dispatched: 6-Mar-06
Installation/Rig Nabors 9ES Dispatched By: Mauricio Perdomo
LWD Log Delivery V1.1,10-02-03
Data No Of Prints No of Floppies
Surveys 2 1
Received By: Please sign and return to:
Drilling & Measurements LWD Division
2525 Gambell Street, Suite 400
Anchorage, Alaska 99501
nroselC~slb.com
Fax:907-561-8317
~ ~ ~ ~ ~ ~
~ ~ s
~"°~ ~ FRANK H. MURKOWSKI, GOVERNOR
~~ OI~ ~ ~ 333 W. 7"' AVENUE, SUITE 700
C011TSIriRQA'rI011T CO1rII-IISSIOI~T ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-7433
Dave Wesley FAx (907) 276-7542
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Re: PBU V-203L3
BP Exploration (Alaska), Inc.
Permit No: 205-171
Surface Location: 4801' FSL, 1920' FEL, SEC. 11, T 11 N, R 11 E, UM
Bottomhole Location: 636' FSL, 3988' FEL, SEC. 35, T12N, R11E, UM
Dear Mr. Wesley:
Enclosed is the approved. application for permit to redrill the above development well.
The permit is for a new well branch of existing well PBU V-203L3, Permit No. 205-171
API No. 50-029-23285-62. Production should continue to be reported as a function of
the original API number stated above.
This permit to redrill does not exempt you from obtaining additional permits or
approvals required by law from other governmental agencies, and does not authorize
conducting drilling operations until all other required permits and approvals have
been issued. In addition, the Commission reserves the right to' withdraw the permit in
the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25
of the Alaska Administrative Code unless the Commission spec~cally authorizes a
variance. Failure to comply with an applicable provision of AS 31.05, Title 20,
Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms
and conditions of this permit may result in the revocation or suspension of the permit.
Please provide at least twenty-four (24) hours notice for a representative of the
Commission to witness any required test. Contact tY~Commission's petroleum field
inspector at (907) 659-3607 (pager). ~ J
DATEL) this~J day of November, 2005
cc: :Department of Fish 8v Game, Habitat Section w/ o encl.
]Department of Environmental Conservation w/o encl..
STATE OF ALASKA
' ALASKA OIL AND GAS CONSERVATION OMISSION
PERMIT TO DRILL
20 AAC 25.005
~~~ 1~114P~~
1 a. Type of work ®Drill ^ Redrill
^ Re-Entry 1 b. Current Well Class ^ Exploratory ®Development Oil ^ Multiple Zone
^ Stratigraphic Test ^ Service ^Development Gas ^ Single Zone
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well
Bond No. 6194193 11. Well Name and Number:
PBU V-203L3
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth:
MD 10507 TVD 4411 12. Field /Pool(s):
Prudhoe Bay Field / Orion
4a. Location of Well (Governmental Section):
Surface:
1920' FEL
4801' FSL
SEC
11
Ti 1 N
R11 E
UM 7. Property Designation: RPC. // ~
ADL 028238/,2'$,2 y0 Schrader Bluff
,
,
.
,
,
,
Top of Productive Horizon:
2944' FSL, 5122' FEL, SEC. 02, T11 N, R11 E, UM (OBa) 8. Land Use Permit: 13. Approximate Spud Date:
November 23, 2005
Total Depth:
636' FSL, 3988' FEL, SEC. 35, T12N, R11 E, UM 9. Acres in Property:
2560 14. Distance to Nearest Property:
9010'
4b. Location of Well (State Base Plane Coordinates):
Surtace: x- 590381 - 5970046 Zone- ASP4 10. KB Elevation Plan
(Height above GL): 78.2 feet 15. Distance to Nearest Well Within Pool
1005' from V-211
16. Deviated Wells: Kickoff Depth: 6675 feet
Maximum Hole Angle: 98 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 1970 Surtace: 1528
ts. as ng mgram:
Size..:
Specifications Setting Depth
To Bottom uantity o ement
c.f. or sacks
Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data
6-314" 4-1/2" 12.6# L-80 1BT 3906' 6600' 4353' 10506' 4411' Uncemented Slotted Liner
19. PRESENT WELL CONDITION SUMMARY (To be completed for Rednll AND Re-e ntry Operations)
Total Depth MD (ft):
10530 Total Depth TVD (ft):
4501 Plugs (measured):
None Effective Depth MD (ft):
10530 Effective Depth TVD (ft):
4501 Junk (measured):
None
Casin Len h Size Cement Volume MD TVD
r
r 110' 20"x34" 60 sx Arctic Set A rox. 110' 110'
3388' 10-3/4" 3 sx AS Lite, 441 sx Class 'G' 3388' 2681'
7328' 7-518" 725 sx Class 'G' 7328' 4526'
Pr i
'n 2845' 4-1/2" Uncemented Slotted Liner 7685' - 10530' 4544' - 4501'
Liner OBd 3605' 4-1/2" Uncemented Slotted Liner 6920' - 10525' 4445' - 4561'
Liner OBb 3761' 4-1/2" Uncemented Slotted Liner 6750' - 10511' 4388' -4446'
Perforation Depth MD (ft): Slotted Liner Perforation Depth TVD (ft): Slotted Liner
20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis
® Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Scott Kolstad, 564-5347
Printed Name Dave Wesley Title Senior Drilling Engineer randon elder, 564-5912
_ Prepared By Name/NUmber.
Si nature Phone 564-5153 Date // l~~03 Terrie Hubble, 564-4628
Commission Use Only
Permit To Drill
Number: ,Zo - API Number:
50- 02. - ,2 3 Z s.. G ~ Permit Ap royal
Date: ~ See cover letter for
other requirements
Conditions of Approval: Samples Required ~; Yes ~No Mud Log Required ^ Yes ~ No
Hydro en Sulfide Measures ^ Yes ~ No Directional Survey Required 'Yes ^ No
__. .~
t ,
Other: ~ ~z ~ , _" ~~CI - f- ti ~.~ ~C~t~? ~ ~t
- - t - _.. `7 -_ -.
APPROVED BY
A roved B ~* ~ r t THE COMMISSION Date ~~
Form 10-401 Revised 06~ ! Submit In Duplicate
} .~,.
u
Well Name: V-203, V-203L1, V-203L2, V-203L3, &
V-203L4
Drill and Complete Plan Summary
Type of Well (producer or injector): ~ Schrader Bluff OA, OBa, OBb, OBc, and OBd Multi-Lat
Surface Location: X = 590,380.87 Y = 5,970,046.49
As Built Sec 11, T 11 N, R 11 E, 4801' FSL & 1920' FEL
V-203 OBc Target Start: X = 587,130 Y = 5,973,420 Z = -4445 TVDSS
Sec 2N, T 11 N, R11 E, 5127' FEL 2934' FSL
V-203 OBc Target End: X = 588,230 Y = 5,976,415 Z = -4420 TVDSS
Sec 35, T 12N, R11 E, 3988' FEL & 636' FSL
V-203L1 OBd Target Start: X = 587,130 Y = 5,973,420 Z = -4445 TVDSS
Sec 2N, T 11 N, R11 E, 5127' FEL & 2934' FSL
V-203L1 OBd Target End: X = 588,230 Y = 5,976,415 Z = -4480 TVDSS
Sec 35, T 12N, R11 E, 3988' FEL & 636' FSL
V-203L2 OBb Target Start: X = 587,215 Y = 5,973,700 Z = -4340 TVDSS
Sec 2N, T 11 N, R11 E, 5038' FEL & 3213' FSL
V-203L2 OBb Target End: X =588,230 Y = 5,976,415 Z = -4365 TVDSS
Sec 35, T 12N, R11 E, 3988' FEL & 636' FSL
V-203L3 OBa Target Start: X = 587,135 Y = 5,973,430 Z = -4285 TVDSS
Sec 2N, T 11 N, R11 E, 5122' FEL & 2944' FSL
V-203L3 OBa Target End: X = 588,230 Y = 5,976, 415 Z = -4330 TVDSS
Sec 35, T 12N, R11 E, 3988' FEL & 636' FSL
V-203L4 OA Target Start: X = 587,070 Y = 5,972,655 Z = -4200 TVDSS
Sec 2N, T 11 N, R11 E, 5197' FEL & 2169' FSL
V-203L4 OA Target End: X = 588,230 Y = 5,976,415 Z = -4265 TVDSS
Sec 35, T 12N, R11 E, 3988' FEL & 636' FSL
AFE Number: ORD5M3559 Ri Nabors 9ES GL: 52.7 RT: 28.5 RTE: 81.2
Estimated Start Date: November 23, 2005 O eratin da s to com lete: 41
Well Information
Distance to Nearest Property: 9010' from Top Nato PBU boundary
Distance to Nearest Well in Pool: 1005' from V-211 i at top OBd
Well Type: Schrader O-sand Penta-lateral Producer
Current Status: New well, conductor is set
Conductor: 20"X34", 215.5 ppf, A53, ERW set at 110' KB
H2S: 0 ppm from produced fluids (approximated to be around 10 ppm due to
contaminated gas lift gas)
BHT: 90 °F ~ 4526' TVD
BHP: 8.3 - 8.6 EMW ppg in Schrader OBd sands
Permit to Drill 10/27/05
•
Formation Markers:
Commercial
Est. Formation Hydrocarbon Est. Pore Est. Pore
To s Uncertaint Bearin Press. Press.
Formation TVDss feet Yes/No Psi EMW
G1 -245 +1-50' No 110 8.7
SV6 -875 +/-50' IVo 394 8.7
SV5 -1530 +/-50' No 689 8.7
SV4 -1650 +/-50' Gas H orates 743 8.7
Base
Permafrost
-1700
+/-50'
Gas H orates
765
8.7
SV3 -2030 +/-50' Gas H orates 914 8.7
SV2 -2200 +/-50' Gas H orates 990 8.7
SV1 -2500 +/-50' Gas H orates 1125 8.7
UG4 -2785 +/-50' Thin coal 1253 8.7
UG4A
-2810
+I-50' Heavy Oil between -2815
and -2950' SS
1265
8.7
UG3 -3145 +/-50' Thin coals 1415 8.7
UG1
-3610
+/-50' Heavy Oil from -3895 to -
s~oo' ss
1625
8.7
Ma -3895 +/-50' -Vo 1753 8.7
Mb1 -3940 +/-50' No 1773 8.7
Mb2 -4010 +/-50' 1805 8.7
Mc -4085 +/-50' 1838 8.7
Fault #1
-4115 +/- 150' MD -
see fault section
for details
Na faulted out n/a
Nb faulted out n/a
Nc -4120 +/-50' Yes 1854 8.7
OA -4215 +/-50' Yes 1840-1880 8.4-8.6
OBa -4275 +/-50' Yes 1880-1920 8.4-8.6
OBb -4315 +/-50' Yes 1942 8.7
OBc -4375 +/-50' Yes 1969 8.7
OBd -4425 +/-50' Yes 1900 -1970 8.3 - 8.6
OBe not reached +/-50' Yes
NOTE: All formation tops are required from surface to TD for all new wells
Mud Program:
13-1/2" Surface Hole Mud Pro rties: S ud -Freshwater Mud
Interval Densi Funnel vis YP PH FL
Initial 8.5 - 9.1 250-300 50-70 8.5-9.0 NC-8.0
Base Perm 9.0 - 9.5 200-250 30-45 8.5-9.0 8.0
Interval TD 9.6 max 200-250 30-40 8.5-9.0 5.0-7.0
9-7/8" Intermediate Hole Mud Pro rties: Freshwater Mud LSND)
Interval Densi YP PV API Filtrate MBT H Chlorides
Surface shoe to interval TD 8.8 - 9.3 22-30 12-18 4-6 < 20 9.0-9.5 <600
6-3/4" Production Hole Mud Pro erties: LVT-200 MOBM Versa-Pro
Interval Densi Stabili Oi1:Water Ratio YP PV API Filtrate MBT
All five Laterals 9.2 650-900 80:20, initial 15-19 <20 4-5.5 < 6
Permit to Drill 10/27/05
•
Survev and Loaaina Program:
13-1/2" Hole Section: Surface G ro ma be needed
O en Hole: MWD / GR
Cased hole: None
9-7/8" Intermediate Hole: Surve s will be IIFR corrected real time and multi-station
O en hole: MWD / GR / Res / Azimuthal Den / Neu / PW D
Cased Hole: None
6-3/4" Produciton Holes: Surveys will be IIFR corrected real time and multi-station
O en hole: MWD / GR / Res / Azimuthal Den / Neu /AIM / PWD
Cased Hole: N/A
Casina/Tubina Program
Hole Size Csg /
Tb O.D. Wt/Ft Grade Conn Burst
si Collapse
si Length Top
MD /TVD Bottom
MD /TVD
48" 20" X 34" 215.5# A53 Weld GL 110'/110'
13-%i" 10-3/a" 45.5# K-55 BTC 3,580 2,090 3388' GL 3388' / 2681'
9-%e" 7-5/e" 29.7# L-80 BTC-M 6,890 4,790 7328' GL 7328' / 4526'
6-3/a" OBc 4-'/z" slotted 12.6# L-80 IBT N/A N/A 2845' 7685' / 4544' 10530' / 4501'
6-3/a" OBd 4-'!z" slotted 12.6# L-80 IBT N/A N/A 3605' 6920' /4445' 10525' / 4561'
6-3/a" OBb 4-'/2" slotted 12.6# L-80 IBT N/A N/A 3761' 6750' / 4388' 10511' / 4446'
6-3/a" OBa 4-'/z" slotted 12.6# L-80 IBT N/A N/A 3906' 6600' / 4353' 10506' /4411'
6-3/a" OA 4-'/2" slotted 12.6# L-80 IBT N/A N/A 4093' 6400' / 4240' 10493' / 4346'
Tubin 4-'/2" 12.6# L-80 IBT-M 8,430 7,500 6300' GL 6300' / 4195'
Surface and Anti-Collision Issues
Surface Shut-in Wells:
V-108 will require surface shut-in and well house removal in order to move over well V-203. No other wells should
require well house removal and surface shut-in.
Close Approach Shut-in Wells: There are NO wells requiring subsurface isolation for this profile. V-108 will
remain shut in until V-203 is drilled past 800'.
Close An~roach Well List:
Well Name Ctr-Ctr Distance Reference MD Allowable Deviation Precautions Comment
V-108 10.75' 599.23 7.01 Use Travelin C tinder G o
Cement Calculations
Casin Size: 10-3/a -in 45.5-Ib/ft K-55 BTC surface casi
Basis: lead: 250% excess over gauge hole in permafro;
Lead TOC: Surface
Tail: 1,000' of open hole with 30% excess, plus 8~
Tail TOC: 2,388' MD 1,000' MD above shoe
Total Cement Volume: Spacer 75 bbls of Viscosified S
Tail 92 bbls, 516 cuff, 441 sks
Temp BHST -55° F, BHCT -60°
30% excess over gauge hole below permafrost
weighted to 10.10 ppg (Mud Push)
10.7 Ib/gal ASL (G + adds) - 4.44 cuff/:
5.8 Ib/gal Class G + adds -1.17 cuft/sk
estimated by Schlumberaer
In the event that cement is not circulated to surface during the initial surface casing cement job, notify the
AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Open TAM Port
Collar and perform second cement job.
Casin Size: 7-5/8", 29.7-Ib/ft L-80 BTC-M intermediate
Basis: Lead: None
Lead TOC: N/A
3 Permit to Drill 10/27/05
•
Tail: 2940' of open hole with 30% excess, plus 80' shoe track
Tail TOC: 4388' MD 1492' MD above the Ma, 1000' MD below Surface Shoe
Total Cement Volume: Wash 20 bbls CW 100
S acer 50 bbls of Viscosified S acer Mud ush Wei hted to 10.3
Tail 150 bbls, 842 cult, 725 sks 15.8 Ib! al G + Gasblok -1.16 cuft/sk
Temo BHST ~ 90° F from SOR
Centralizer Recommendations
10-'/." Casing Centralizer Placement
a) Run (25) 10-3/4" Bow-spring centralizers attached over the collar of each joint of casing from the
casing shoe up to 2,388' MD (1,000' MD above the shoe).
b) This centralizer program is subject to change pending actual hole conditions.
7-'/e" Casing Space Out
a) Spaceout the 7 5/a" casing to place a full joint in the window area of the OBb, OBa and OA sands.
These KOP's may be altered to enhance reservoir contact depending on the angle of
intersection of each zone.
b) Place 1 RA tag above each window exit. RA tags to be spaced out -40 - 80' above window
depth except on the OBd lateral. The RA tag for the OBd lateral will need to be placed 1125'
above the casing shoe.
4 Permit to Drill 10/27/05
C~
Well Control
•
Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular
preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon
calculations below, BOP equipment will be tested to 3,500 psi. Due to test pressures not exceeding
5,000psi it will not be necessary to have two sets of pipe rams installed at all times.
BOP regular test frequency~witl be 14 days.
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Surtace Hole
A diverter will be nippled up and function tested prior to drilling surface hole
Intermediate Section
• Maximum anticipated BHP:
• Maximum surface pressure:
• Planned BOP test pressure:
• 10-3/4" Casing Test:
• Integrity Test - 9-7/8" hole:
• Kick Tolerance:
Production Section
• Maximum anticipated BHP:
• Maximum surface pressure:
• Planned BOP test pressure:
• 7-518" Casing Test:
• Integrity Test -6-3/4" hole:
• Kick Tolerance:
• Planned completion fluid:
1970 psi -Schrader OBd (8.6 ppg C~3 4,425' TVDss)
1,528 psi -Based on a full column of gas C~1 0.10 psi/ft
3,500 psil250 psi Rams
2,500 psi/250 psi Annular '
3,500 psi
LOT 20' from -10-3/4° shoe
130 bbls with an 12 ppg EMW LOT at Ma with 8.7 pore pressure
1970 psi -Base of Schrader OBd (8.6 ppg C~3 4,425' TVDss)
1,528 psi -Based on a full column of gas C~1 0.10 psi/ft
3,500 psi/250 psi Rams
2,500 psi/250 psi Annular
3,500 psi
FIT to 11.5ppg EMW 20' from 7-5/8" shoe (FIT test for OBc lateral only)
Infinite at OBc, OBd, OBb, OBa, and OA with an 11.5 ppg EMW FIT
9.2 ppg SF OBM in Laterals, 9.2 ppg Brine, 6.8 ppg diesel in mother bore
Disposal
• No annular injection in this well.
• Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-
04. Any metal cuttings will be sent to the North Slope Borough.
+ Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection.
Haul all Class 1 waste to Pad 3 for disposal.
5 - Permit to Drill 10/27/05
•
•
Drilling Hazards and Contingencies
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control
A. The Schrader in the target fault block is expected to be normal pressured at 8.3-8.6 ppg EMW. This
pressure is estimated based on offset well pressures and material balance.
II. Hydrates and Shallow gas
A. Gas Hydrates are expected at V-pad from the SV5 thru the SV1 sands below the base of the permafrost.
Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole.
Recommended practices and precautions for drilling hydrates should be followed in the surface hole.
Occasionally hydrates are encountered below the SV1.
III. Lost Circulation/Breathing
A. Lost circulation is not expected at fault #1. This fault has been penetrated by most wells drilled from V
Pad.
B. Breathing is not expected on this well.
IV. Kick Tolerance/Integrity Testing
A. The 10-3/4" casing will be cemented to surface.
B. The 10-3/4" casing test pressure is 3500 psi.
C. The Kick Tolerance for the surface casing is 130 bbls with 9.1 ppg mud, 12 ppg LOT, and an 8.7 ppg pore
pressure.
D. 9-7/8" Open hole Integrity Testing -LOT to a minimum of 12 ppg EMW 20' from the shoe.
E. The 7-5/8" intermediate casing will be cemented with 15.8 Ib/gal tail cement to 1492' MD above the Ma
sand C~ 4388' MD.
F. The 7-5/8" casing test pressure is 3500 psi.
G. The Kick Tolerance for the intermediate casing is infinite (at OBc, OBd, OBb, OBa, and OA) with 9.3 ppg
mud, 11.5 ppg FIT, and an 8.3-8.7 ppg pore pressure.
H. 6-3/4" Open hole Integrity Testing (at OBc, OBd, OBb, OBa, and OA) -FIT to a minimum of 11.5 ppg
EMW 20' from the shoe.
V. Hydrogen Sulfide
V Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should
be followed at all times. No measurable H2S is being produced from the formation at this time. However 10
ppm is measured regularly at V pad as a result of the use of Ivishak gas lift gas. All V Pad gas lift wells will
likely have H2S in this concentration. Note that all injection has been with produced water not seawater. H2S
levels are expected to remain low until the waterflood matures. Recent H2S data from the pad is as follows:
Adjacent producers at Surface: ~ Adjacent producers at TD:
V-101 10 ppm V-102 25 ppm
V-108 20 ppm
VI. Faults
A. One fault is expected to be crossed at V-203. No losses are expected to be associated with this fault.
Details are listed below for reference:
Fault Location MD TVDss Throw Direction Uncertainty
Fault #1 - UG Mc 6304' 4115' -100' South +/- 150' MD
CONSULT THE V PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
6 Permit to Drill 10/27/05
•
V-203, V-203 L1, V-203 L2, V-203 L3 & V-203 L4
DRILL AND COMPLETE PROCEDURE SUMMARY
Pre-Rig Work:
1. A 34" x 20" insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC
Gen 5 Wellhead on the conductor.
2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and
production simops.
Drillin4 Rig Operations:
1. MIRU Nabors 9ES. Nipple up diverter spool and riser. Function test diverter. PU 4" DP and stand back in
derrick.
2. MU 13-'/2" drilling assembly with MWD/GR and directionally drill su~#ace hole to approximately 3388' MD. The
actual surface hole TD will be +/-100' TVD below the top of the SV1 sand.
3. Run and cement the 10-3/a", 45.5#, L-80 BTC surface casing back to surface. ND drilling spool and riser and
NU casing /tubing head. NU BOPE and test to 3,500 psi.
4. MU 9-%e" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Ghost reamer t1,000'and
12,000' from the bit. RIH to float collar. Test the 10-3/a" casing to 3,500 psi for 30 minutes.
5. Drill out shoe track. Circulate and condition mud. Displace well to new 8.8 LSND drilling fluid. Drill 20' of new
formation below rathole and perform a LOT. Directionally drill ahead to TD (-120' MD below Top OBd) as per
directional profile to 7328' MD.
6. Make short trip as needed, work tight spots as seen. Circulate and condition mud at TD. Make sure hole is
clean prior to POOH. POOH for casing.
7. MU and run 7-S/e" 29.7# L-80 BTC-M long string casing to TD. Cement in one stage to 1492' MD (1000' from
the surface casing shoe) above the Schrader Ma sand. Bump plug with seawater.
8. Clean pits for displacement. Freeze protect 7 5/e" x 10-3/a" annulus to 2,200' TVD.
:• V-203 OBc Lateral
9. PU 6-3/a" conventional assembly with MWD/GR/Res/Den /Neu/AIM/PWD and RIH to the float collar. Test the
7 5/8" casing to 3,500 psi for 30 minutes.
10. Displace well over to 9.2 ppg Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of
new formation below rat hole and perform FIT to 11.5 ppg EMW.
11. Directionally drill ahead to TD geo-steering through the OBc to TD at --10530' MD. Back ream out of the hole
to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM.
12. POOH to near OBb window depth, log into top OBb (RA marker) with GR, log across the OBa and OA windows
as well. POOH.
13. MU and run 4-'/2" 12.6# L-80 BTC-M slotted liner with swell packer and Aluminum billet liner top. Position billet
at 7,685'. POOH.
• V-203L1, OBd Lateral
14. RIH with 6-3/a" sidetracking /drilling assembly with MWD/GR/Res/Den/Neu/AIM/PW D to AI billet. Displace well
over to 9.2 ppg Versapro MOBM. Time mill off billet to sidetrack. Directionally drill to the planned TD in the
OBd. Back ream out of hole to shoe, circulate and condition mud. RIH to TD and displace well bore to SF
MOBM. POOH.
15. MU and run 4-'/z" 12.6# L-80 BTC-M slotted liner with liner hanger and liner top packer. Position TOL for OBb
whipstock. POOH.
:• V-203L2, OBb Lateral
16. PU the 7 5/8" whipstock assembly. Set the whipsock on the OBd liner top packer such that the top of the
window is near the top of the OBb sand. Orient and set whipstock. Shear off Whipstock. Displace well over to
9.2 ppg Versapro MOBM. Mill window. POOH.
17. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock.
Directionally drill to the planned TD of OBb lateral. Back ream of of hole to KOP, circulate and condition mud.
RIH to TD and displace well bore to SF MOBM. POOH.
18. Pull whipstock #1. Run and set 4-'/2" slotted liner and hook hanger. POOH and LD liner running string. Run
Baker Hook Hanger Lateral Entry Module #1 with ZXP liner top packer, POOH.
• V-203L3, OBa Lateral
7 - Permit to Drill 10/27/05
19. PU the 7-S/8" whipstock assembly. Set the whipsock on the OBb liner top packer such that the top of the
window is near the top of the OBa sand. Orient and set whipstock. Shear off Whipstock. Displace well over to
9.2 ppg Versapro MOBM. Mitl window. POOH.
20. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock.
Directionally drill to the planned TD of the OBa lateral. Back ream out of hole to KOP, circulate and condition
mud. RIH to TD and displace well bore to SF MOBM. POOH.
21. Pull whipstock #2. Run and'set 4-~/2" slotted liner and hook hanger, POOH and LD liner running string. Run
Baker Hook Hanger Lateral Entry Module #2 with ZXP liner top packer, POOH.
• V-203L4, OA Lateral
22. PU the 7 5/e" whipstock assembly. Set the whipsOCk on the OBa liner top packer such that the top of the
window is near the top of the OA sand. Orient and set whipstock. Shear off of Whipstock. Displace well over
to 9.2 ppg Versapro MOBM. Mill window. POOH.
23. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock.
Directionally drill to the planned TD of the OA lateral. Back ream out of hole to KOP, circulate and condition
mud. RIH to TD and displace well bore to SF MOBM. POOH.
24. Pull whipstock #3. Run 4-Yz" slotted liner and hook hanger, POOH and LD liner running string. Run Baker
Hook Hanger Lateral Entry Module #3 with ZXP liner top packer. Clean pits for displacement. Displace mother
bore over to 9.2 ppg KCL brine. POOH.
25. MU 4-~/2" 12.6# IBT-M, L-80 completion assembly and RIH. See completion schematic for details. Land tubing
hanger and run in lockdown screws.
26. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus
to 3,500 psi. Shear DCK valve.
27. Install two-way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test the tree to
5,000 psi.
28. Pull two-way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze protect the well
to 2,200' TVD. Install VR plug in 7-5/e" casing annulus valves.
29. Install BPV. Secure the well and rig down /move off Nabors 9ES.
Post-Riot Work:
1. MIRU slickline. Pull the ball and rod /RHC plug.
2. Pull out DCK shear valve, install GLV in all of the other mandrels as per the PE.
8 Permit to Drill 10/27/05
! ~
Variance Request
Issue
Compliance with AOGCC testing requirements for BOP rams after they have been used in the
normal coarse of operations.
Re uest
The AOGCC is in the process of developing a guideline document clarifing the intent of the
regulations pertaining to function pressure testing ram type BOP's.
BPXA requests a variance to the provisions of 20 AAC 25.035 (e)(10)C regarding the function
pressure test requirement after the use of BOP ram type equipment for other than well control
or equivalent purposes, except when the routine use of BOP ram typo equipment may have
compromised their effectiveness. (Example would be when pipe rams are inadvertently closed
on a tool joint during routine operations.) The activities associated with this request will not
compromise the integrity of the BOP equipment.
Background
AOGCC regulations require rams that have been used in the course of primary drilling &
completion, workover and through tubing drilling operations be function pressure tested before
the next wellbore entry. This is not a new regulation. The intent of this regulation is to ensure
that ram type equipment has integrity after it has been utilized in a wellbore...for example; to
ensure integrity if a ram was closed on a tool joint. The exact regulation language. is:
uif BOP sealing ram type equipment has been used, it must be function pressure-tested, before
the next wellbore entry, to the required working pressure specified in the approved Permit to
Drill, using anon-compressible fluid, except that an annular type preventer need not be tested
to more than 50 percent of its rated working pressure;"
The pertinent sections are: 20 AAC 25.035 (e)(10)C PRIMARY DRILLING AND
COMPLETION; 20 AAC 25.036 (d)(4) THROUGH TUBING DRILLING AND COMPLETION;
20 AAC 25.285 (f)(2) TUBING WORKOVERS: 20 AAC 25.286(e)(1) WORKSTRING
SERVICE OPERATIONS
This issue has been discussed with Winton Aubert at the AOGCC. The test requirement in the
regulation is intended to apply to ram type equipment only. The AOGCC understands that ram
type BOP's are utilized for purposes other than well control in the normal coarse of operations.
The regulations allowing a variance are at 20 AAC 25.035(h) PRIMARY DRILLING AND
COMPLETION; 20 AAC 25.036(f) THROUGH TUBING DRILLING AND COMPLETION; 20
AAC 25.285(h) TUBING WORKOVERS; 20 AAC 25.286(g) WORKSTRING SERVICE
OPERATIONS...which says generally:
20 AAC 25.035(h)... Upon request of the operator, the commission will, in its discretion,
approve a variance
(1) from the ROPE requirements in (e) of this section if the variance provides at least an
equally effective means of well control;
_~ - .- - _
- - - - - - l-PAD ~.:.
~_- E 5.172 --- --------- I 34. 35 36
GRID I t12N
i
15'00'00 ~Z
T11N'
I I ~
_
~ PLANT
~
WEST
%'
,
I
K
K
~~
I I
2
1
I
~ ~
3
I -
PROJECT'
I ^ v-t 18 ^ v-115 I AREA
I ^ V-03 ^ V-2131 I
^ V-110 ^ V-100 I
~
I
^ V-111 I
rvp
I ^ V-117
^ V-103
"
/
,
^ SLOT S-R I
, ~ ~.`' 411
12
e ,.: ,,.
^ V-106 I NF
I
0
I
I
I ^ V-105i ^ V-01 I `~" ,
^ SLOT N-M
~ VICINITY M A P
I I N.T.S.
I ,°,~ ^ V-102 ^ V-SPARE (s~or s-~) I ~
"' ^ V-201
Z : V-027 ^ SLOT S-J o f
LEGEN D
I v-1o4i ^ v-2o4 m l
I V-2101 ^ V-114 ~ I ~ AS-BUILT CONDUCTOR
V-202 ^ V-119 ZI
I
V-SPARE (SEDT N-E) ^ V-109
^ EXISTING CONDUCTOR
I
I V-101
V--2111 ^ V-113 I
I V-108 I
I V-203 I
I
I
I I OF q
I
I °
q
°°°° °
I I ,`Q,°°°
°
s~r
~ o °
I \
°,9
I ~ ~0 49~ °e~
I °°°°°°°°°°°°°°°°°°°°°°°°°°°°°
I V-PAD ~-
I ROAD ~~
TO SPINE °°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°
_ _ - - - - - '~ °o Richard F. Allison
_ _
~
O`(~AE,PAD '-~ ~-" i ° 10608 °°
T
NOTES
1. DATE OF SURVEY: JULY 17 & 18, 2004. ,
SURVEYORS CERTIFICATE
2. REFERENCE FIELD BOOK: W004-11 Pcs. 1s-2s.
3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, I HEREBY CERTIFY THAT I AM
NAD 27. GEODETIC POSITIONS ARE NAD-27. PROPERLY REGISTERED AND LICENSED
TO PRACTICE LAND SURVEYING IN
4. BASIS OF HORIZONTAL CONTROL IS V-PAD
THE STATE OF ALASKA AND THAT
OPERATOR MONUMENTATION. THIS PLAT REPRESENTS A SURVEY
5. BASIS OF ELEVATION IS KUPARUK PIPELINE CONTROL. MADE BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT ALL
ELEVATIONS ARE BP MEAN SEA LEVEL DATUM.
DIMENSIONS AND OTHER DETAILS ARE
~
6. THE MEAN SCALE FACTOR FOR V-PAD IS 0.999909334.
CORRECT AS OF JULY 18, 2004.
LOCATED WITHIN PROTRACTED SEC. 11, T. 11 N., R. 11 E., UMIAT MERIDIAN, ALASKA
WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION
N0. COORDINATES COORDINATES POSITION DMS POSITION D.DD) BOX ELEV. OFFSETS
V-203 Y=5,970,046.49 N=10,180.05 70'19'40.471"
"
' 70.32799086'
52
7' 4,801' FSL
'
X= 590,380.87 E= 4,629.84 149'16
01.221 149.2670058' ' 1,920
FEL
V-210i Y=5,970,069.62 N=10,179.79 70'19'40.688"
'
" 70.3279689' S2 6' 4,823' FSL
'
X= 590,468.21 E= 4,720.20 149'15
58.663 149.2662953' 1,833
FEL
V-211 i Y=5,970,054.32 N=10,180.08 70'19'40.544"
'
" 70.3279289' S2 4' 4,809' FSL
'
X= 590,410.00 E= 4,660.00 149'16
00.368 149.2667689' 1,891
FEL
V-SPARE Y= 5,970,061.76 N=10,179.73 70'19'40.614" 70.3279483' 53 1' 4 816' FSL
'
SLOT N-E X= 590,439.13 E= 4,690.07 149'15'59.515" 149.2665319' 1,862
FEL
r'. xo°err. °,."°~.. HACI(LEMAN
CHECKED: ONEI~ l~p
0 DATE: F'
7 22 04
F°Rrieo `~wov o~-oo GREATER PRUDHOE BAY V-PAD ~"~T°
108 NOo AS-BUILT WELL CONDUCTORS
° scAEE: V-203, V-210i, V-211 i 1 0~ 1
~.~~
.,°, ~ ~ ~ FOR "`0R1A70" ~„~„ 'e"" "',~° wi.or ~_~ t"=t50' and V-SPARE (SLOT N-E)
wlil.Ix:-rAa., ANTI-COLlIS10N SETTINGS fUMPANY INilAl1.S urttvliv YRixa
11~e .W8 .PI-W WXIh®y PerugS IAlinde I..wlliaXk Rk% HP AInX>~ IkryN F'm IkpN I'o %urvey~Pkn
Interpolation MetlwdMD Interval: 25.00
Pk4 V-Mt (N-A) R6.TI -.i1pI.N ,t97W16,d9 SWiNUA7 70°19011.471N 14Y°IbVI.221W WA Depth Range From: 28.50 To: 10530.14 (-ahuklkarMA%d: Minenw CunwuY 2%.511 IIXM),gl Pkmak V•2113 xp110 V32
Maximum Range: 12.50.16 Reference: Plan: V-207 wg704 cm. syalXlo: IvwRn a%a.q1 urno.la rklaXk v-zu3 npla vzz
%.an M.•IMNI: Tnv ('3linkr WXV1
lime MXlS.e: IiNgnXxl • ['aXioB
WaminB MetlNal: RukN Hxal
~ tan V-203 L4)
From Colour To MD
S 29 500
33 Y/~ -_ _ ~ t F :~ 'A (P~~ V 2p3 ~3) 1000 1500
1500 2000
~' ~ / 2000 2500
3 ~ - - _ ~ . _ ~~ P 2500 3000
~ , _- ~:'~~~ ~ (, 3000 3500
~"~ f - ~~3~/ 3500 4000
' S _ _ _ - ~ .~ 4000 4500
~ _ ~ ~z'' 4500 5000
~ ~~ l _ ~~ \~ 5000 5500
i~% ~, ~ ~ ~ \ 56000 7000
30 ~' ~ ~ ~ooo sooo
8 ~/ , \~~\~\~ ~~~\~~,~~\ 8~ ------ 900
j - - _ \ ~ \ ~ ~~. ~ . , \ 11000 12000
_ _ ~ 2000 13000
/%~ - - - ~ ~~~ ~~~~~~~ ~~~~ 000 14000
S /~~%'' __ _ .. \\ ~. ~ ~ ,.~`. ~~\~~\~ 00 (5000
- \ ~~\;~
\ \~ 1 1~
~~ ~~ ~ - _ ~
~~. ~ ~\~~ ~ {~~.I I
~~~~~ /
0 270 _ c~v~ ~ ~I ~~ ~~~ Ili ~~~~~~~~
`/ II
\~~~\~\ ~~ i11 / ~~' J~ III l'l ~~ l
C A~ _ / ~~, ~ tl ~~~~~ ~l
8 o A JJ~~ ~ ~ '~~i
w 240 - -- ~ j
r.., ~ ~ -~ _ _-- j,
~~%
a' i
~ ~ --
- _ ~~ ,~
i3 - ~~ - - _ -~, ~' /i
`1- _ ~ ~ Y
`_` _ _ `/'i`5~ F /
2 ~ _-~_ _ - /- / SO
lO V v
T ling ylind Azim ( ) [ ] vs C r ~ f _
tre tc~ 1 ~ritre~Se~aration~ 5 W
~,
J
~ry
~~~\
20
Tcwl
crux ~..
M WU• N''R-M%
10e4 v-2o3
RI8 uy„N 16
Rcl. lklnml Mc~q.i X12Utl
~.k riYn (XiBk (]r~io BuuUat
A1yJe 'N• •F-W YnXn IVU
772.111" 11.1X1 U.IXI 2M.511
I -n,11.413
1.100 (L•1
Ykn 1: 213
Plan V-112
rkn v u2
Yk0 V-112
1'kn V-203
Pkn V-207
~~ Pkn V-207
~• Plan V•2U3
Yk0 v-2o3
Yknv-z l4
~ V4121V412
vaol rv-I
v-uuly-I
v-lo4rv-I
V-Ia5 (v-I
V-IU7 rv-I
V-INN (V-I
~ V•IIIY IV-I
V-IW IV•1
- V.IWIV-1
- ~-u7rv-I
- v-n01v-1
v-Ildrv-1
v 1urv.l
- v-u4rv-I
V•I IY IV-I
- v-2ol rv-z
'- v.29z rv-z
vaox rv-z
- v-zuz rv-z
- v-201 rv•2
~aa 1~,-2
V3U4IV-2
V-2W lV-2
V•201IV-2
- v-za rv-2
- v-2w rv-z
~ V-'.IM IV-2
V-21111V-2
V•211 rv-2
V-2211V-2
vk> a-211n3
Rek
Rkk
Risk
Rixk
Rink
11q/
Rek
~ Rec MU Lw M TVU •NI-% .F/-W Ul.q TFue VSa lal%el
I 2N Cll II1X1 O.IXI $8_W UW UW O.W U.W U.W
2 i1NIW IIW V.ql iW.W UW U.W U.W U.W O.W
d3J 1} 2,1X1 702.1X1 433.11 113 •1.97 1.50 302.W 1.78
d Ril.i'1 INgI 302.1X1 RW.N 2737 -i7..t0 2.W O.W 3)77
5 1566 b7 32W 702.1X) 151112 1617% -25891 3.W OW 277.77
h 1410W 37.W 302.1X1 I7%CM 261AU •018.97 ISO O.W 378.30
7 21102.94 77 W 3U2.W IgN).W 30779 <9192 U.W U.W 44117
A 3<WI NA 5%<I 302.6N 2259 c3 <I94Y 4126`0 O.W 157 749.01
9 572171 <%cl 302.[41 1691,12 17%132 -2X3-< U.W V.W z556.J5
IU 851720 fi5.lp 3<7.g1 4291.211 2648.40 -327Y.50 4.W 46.53 7531.10 V-203 Top OA
II 655623 R3.7J 15x50 7307.17 26A7.W -32x11.41 4.q1 61.81 3<6<25
L 6711d_cfi 65,74 }5870 416%AI 2%19.Uft •3$N4A3 O.W II.W 3690.Y3
13 772X11 %<,W IS.W 7526.20 UI2.70 -321029 I.W 72.11 1236.75 V-203 TI
14 7037.81 X7.19 IR.cN 0531.37 3516.63 J17R.Yd d.W <526 4325.W
15 76%O.YY tl7.d9 IR.S% 4<N20 3751.0% -31W.W OW O.W 45X.93 V-2W 1J
Ifi 7411 SY 11X1.116 37 <4 1c29.RY 3961.7fl -3W5,7U 9.W 4Y.61 4679.71
17 7YiNIAN IW.W 33.V 4516.111 NXM2.53 -2962.7Y O.Iq U.W 472A.W
IN %IN11.5h 4).IN) 3$.(X1 4506111 411k.13 -2A11.91 9.1X1 -17127 d7991fi V-203 Td
IY 8$.01.12 'NI.IXI IN.%I d51M.211 1216.21 -2N1Y.17 9.1X1 -41.W /W5t
211 %%57117 41.1X1 IM.%I J51M $U 4X21119 -260112M1 11.1X1 Uql <7Y9.6<
21 %%7Y,IIY 41.1X1 IY.h4 4cIM.20 4X41 UI -2632.99 4.1X1 YgIXI YI722 V-211.7 I'4
~] 22 %xY7A5 41.71 IY.69 d(IM Iq Ox<Nb -2626.%u O.W O.W 54J1.7t
27 Y65Y 1% 40.73 19.6Y 404632 557561 -2370.117 O.W O.W bW1A3
2i 9677.N 41.81 19.69 4196.20 5592.W -2763.89 O.W -179AI 6019JA V-20316
25 Y6R7.32 X9.66 19.87 0496.27 <60191 -2)60.65 O,q1 151.93 6056.96
2fi IIISlO.Id M).fifi 19.87 4501.211 6791.54 -2071.IY O.W U.W 6722 <3 V-2V3 T7
~
V-203, L1, L2, L3, & L4 PROPOSED COMPLETION
TREE: FMC 4-1/16" 5M
r WELLHEAD: FMC Gen 5 System
20"X34" 215.5 iblR, A53 ERW Insulated @ 109' 11 ", SM csg.head w/ 7" mandrel hanger & packoft
11" x 17", 5M, Ibg spool wl
Halliburton X-Nipple (3.813" ID) @ 2200' TVD 11" x 4-1l2" tubing hanger with control line ports
17" X 4-1/16" Adaptor Flange
4-1/2", 12.6 Ib/ft, L-80, BTC-M Orig KB elev (N-9ES) _'
Coupling OD: 5.2"
Drift/ID : 3.833"/3.958"
10-3l4", 45.5# L-80 BTC Csg @ 3,388' MD
~l
I~j ~_'" 4.5" Baker sliding sleeve with 3.813" ID @
1 GLM Design:
7-5/8" X 5-1/2" Baker PRM Packer @ #4 -TBD' TVD - 4-1/2" X 1" KBG-2 - SV
#3 -TBD' TVD - 4-1/2" X 1"KBG-2 - DV
Halliburton X-Nipples (3.813" ID) #2 - 4 jts above sliding sleeve - 4-1/2" X 1"KBG-2 - DV
a.5" WLEG @ 6,764' MD #1 - 2 jts above sliding sleeve - 4-1 /2" X 1"KBG-2 - DV
Phoenix
Pressure
Gauge Versapro SFMOBM in each Lateral and in mother bore from tbg tad down.
with control "a-°
lines to surface
/ `. 6 314" OA Lateral 6,400'-10,493'
RA Tag TBD ~~ ®° m ®-_ o-_~-`-o-_~°- - - - ,-~`'.
~,I Swell packer placement TBD
Junction Sp~Ificationa: /
Junction ID through LEM
Module without diverter: 3.68" RA Tag TBD
LEM run with internal sealbores
to allow the use of isolation
sleeve across window.
Baker Hughes Hookwall Hanger
Window in 7-518" casing
Well Inclination @ Window = °
Baker Hughes Hookwall Hanger
W ndow in 7-5/8" casing
Well Inclination @ Window =
Baker Hughes Hookwall Hanger
Window in 7-518" casing
Well Inclination @ Window
6-314" Oea Lateral ';,6,600'_10,506`
RA Tag TBD
Swell packer placement TBD
~' ~ 6-314" OBb Lateral 6,750'-10,511'
Solid Liner
_ \ 17,685'- 10,530'
Swell packer placement TBD Aluminum OBc Lateral
RA Tag TBD ~ Billet ~ ° °o
° °,
_ ~:
_ --
4.7°: ~ 000 - m ~ ~ _ _ ..--'Z_~
29.7#, L-80, BTC-M @ 7328'.
Casing Drift: 6.75"
Casing ID: 6.875"
DATE REV. BY COMMENTS GP
B
/
df
P
p
~
r
~
1011412005 SRK level 3 MuklAateral, 4-112" GL Completion rrr
ir~l
ad
Pr
`-rrf
~
-0
API NO: 50
29-
ORION 50-029-
50-029-
WELL: V-203 ML
50-029-
6-3l4" OBd Lateral 6,920'- 10,525'
•
•
•
Sperry-Sun
BP Planning Report
Company: BP Amoco Date: 9/12/2005 Time: 14:34:48 Page; 1
Field: Prudhoe Bay , Co-ordinate(NE) References Well: Plan V-203 (N-A), True North
Site: PB V Pad Vertical (TVD) Reference: 28.5+52.7 8L2
Well: Plan V-203. (N-A) Section tVS) Reference: Well (Q.OON,t).OOE,342.03Azi)
Wellpathc Plan V-203 L3 SurveyCakulation Method:... Minimum Curvature Db: 'Oracle
Plan: V-203 L3 wp03 Date Composed: 8/25/2005
~~ a /~t>TPrq ~ Version: 18
Principal: Yes Tied-to: From: Definitive Path
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005
Site: PB V Pad
TR-12-12
UNITED STATES :North Slope
Site Position: Northing: 5969964.50 ft Latitude: 70 19 39.618 N
From: Map Easting: 590770.65 ft Longitude: 149 15 49.871 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 0.69 deg
Well: Plan V-203 (N-A) Slot Name:
As-Built ASP 08-23-05
Well Position: +N!-S 86.71 ft Northing: 5970046.49 ft Latitude: 70 19 40.471 N
+E/-W -388.79 ft Easting : 590380.87 ft Longitude: 149 16 1.221 W
Position Uncertainty: 0.00 ft
Casing Points
MD TVD Diameter Hole Size Name
ft ft in in
10506.00 4411.20 4.500 6.750 4 1 /2"
Formations
MD TVD Formations Lithology Dip Angle. Dip'Direction
ft ft deg deg
0.00 NC 0.00 0.00
0.00 OA 0.00 0.00
0.00 OBa 0.00 0.00
6784.16 4391.20 OBb 0.00 0.00
0.00 OBc 0.00 0.00
0.00 OBd 0.00 0.00
Targets
Map Map <--- Latitude --> <-- .Longitude ->
Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec ` `
Dip. Dir. ft ft ft ft ft
V-203 L3 T1 4366.20 3422.68 -3205.17 5973430.00 587135.00 70 20 14.126 N 149 17 34.831 W
V-203 L3 T2 4406.20 4188.89 -2880.88 5974200.00 587450.00 70 20 21.663 N 149 17 25.369 W
V-203 L3 T5 4406.20 5582.90 -2364.01 5975600.00 587950.00 70 20 35.374 N 149 17 10.284 W
V-203 L3 T6 4411.20 6394.54 -2074.19 5976415.00 588230.00 70 20 43.357 N 149 17 1.824 W
V-203 L3 T4 4421.20 5319.04 -2462.20 5975335.00 587855.00 70 20 32.779 N 149 17 13.151 W
V-203 L3 T3 4426.20 4402.81 -2788.29 5974415.00 587540.00 70 20 23.767 N 149 17 22.667 W
Plan Section Information
MD Inel Azim TVD +N/-S +E/-W DLS `Build Turo TFO Target
ft deg deg ft ft ft deg/100ft degl1UOft deg/100ft deg
6675.00 65.74 358.50 4356.26 2792.14 -3283.73 0.00 0.00 0.00 0.00
6695.00 68.12 358.82 4364.10 2810.53 -3284.16 12.00 11.91 1.58 7.00
7013.52 98.03 10.00 4402.19 3121.65 -3259.16 10.00 9.39 3.51 21.35
7220.62 98.03 10.00 4373.27 3323.60 -3223.54 0.00 0.00 0.00 0.00
~ i
Sperry-Sun
BP Planning Report
Company: BP AmoCO - bate: 9/12/2005 Time: 14:34:48 Page; 2
Field: Pnxthoe Bay Go-ordinate(NE) Reference: WeIF. Rlan V-203 (N-A), True North
Site: PB V Pad Vertical (TVD) Reference: 28.5+52.7 81.2 <
Well: Plan V-203 (N-A) Section (VS) Reference: Well (O.OON,O;OOE,342.03Azi)
Wellpath: Plan V-203 L3 Survey Calculation Method: Minimum Curvature Db: Oracle
Plan Section Information
MD Incl Azim TVD +NJ-S +E/-W DLS Build Turn TFO Target
ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft ,deg
7321.71 90.00 11.00 4366.20 3422.68 -3205.17 8.00 -7.94 0.98 172.90 V-203 L3 T1
7492.00 86.95 24.28 4370.75 3584.52 -3153.71 8.00 -1.79 7.80 103.04
8136.19 86.95 24.28 4404.98 4170.88 -2889.15 0.00 0.00 0.00 0.00
8156.05 86.00 25.00 4406.20 4188.89 -2880.88 6.00 -4.80 3.60 143.20 V-203 L3 T2
8214.88 82.93 23.25 4411.87 4242.33 -2856.95 6.00 -5.22 -2.98 -150.44
8272.30 82.93 23.25 4418.94 4294.68 -2834.46 0.00 0.00 0.00 0.00
8390.18 90.00 23.00 4426.20 4402.81 -2788.29 6.00 6.00 -0.21 -2.00 V-203 L3 T3
8449.07 90.30 19.48 4426.05 4457.70 -2766.96 6.00 0.50 -5.98 -85.20
9340.83 90.30 19.48 4421.45 5298.41 -2469.60 0.00 0.00 0.00 0.00
9362.75 91.00 20.00 4421.20 5319.04 -2462.20 4.00 3.21 2.38 36.51 V-203 L3 T4
9452.45 94.53 20.65 4416.87 5403.05 -2431.09 4.00 3.93 0.72 10.36
9530.38 94.53 20.65 4410.72 5475.74 -2403.70 0.00 0.00 0.00 0.00
9644.77 90.00 20.00 4406.20 5582.90 -2364.01 4.00 -3.96 -0.57 -171.86 V-203 L3 T5
9656.91 89.67 19.65 4406.24 5594.31 -2359.89 4.00 -2.76 -2.90 -133.59
10506.62 89.67 19.65 4411.20 6394.54 -2074.19 0.00 0.00 0.00 0.00 V-203 L3 T6
Survey
MD Incl Azim TVD Sys TVD N/S E/W DLS MapN MapE TooUComme t
ft deg_ deg ft ft ft ft deg/100ft ft fY
8875.00 65.74 358.50 4356.26 4275.06 2792.14 -3283.73 0.00 5972798.62 587064.05 MWD+IFR+MS
6895.00 68.12 358.82 4364.10 4282.90 2810.53 -3284.16 12.00 5972817.00 587063.40 MWD+IFR+MS
6700.00 68.59 359.01 4365.94 4284.74 2815.18 -3284.24 10.00 5972821.65 587063.25 MWD+IFR+MS
6784.16 76.46 2.14 4391.20 4310.00 2895.37 -3283.39 10.00 5972901.84 587063.14 OBb
6800.00 77.94 2.71 4394.71 4313.51 2910.81 -3282.73 10.00 5972917.28 587063.61 MWD+IFR+MS
6900.00 87.35 6.15 4407.50 4326.30 3009.56 -3275.05 10.00 5973016.11 587070.10 MWD+IFR+MS
7000.00 96.76 9.54 4403.93 4322.73 3108.44 -3261.44 10.00 5973115.13 587082.52 MWD+IFR+MS
7013.52 98.03 10.00 4402.19 4320.99 3121.65 -3259.16 10.00 5973128.37 587084.64 MWD+IFR+MS
7100.00 98.03 10.00 4390.11 4308.91 3205.98 -3244.29 0.00 5973212.87 587098.50 MWD+IFR+MS
7200.00 98.03 10.00 4376.15 4294.95 3303.49 -3227.08 0.00 5973310.57 587114.52 MWD+IFR+MS
7220.62 98.03 10.00 4373.27 4292.07 3323.60 -3223.54 0.00 5973330.72 587117.83 MWD+IFR+MS
7300.00 91.72 10.79 4366.53 4285.33 3401.36 -3209.27 8.00 5973408.63 587131.15 MWD+IFR+MS
7321.71 90.00 11.00 4366.20 4285.00 3422.68 -3205.17 8.00 5973430.00 587135.00 V-203 L3 T1
7400.00 88.59 17.10 4367.16 4285.96 3498.58 -3186.17 8.00 5973506.12 587153.08 MWD+IFR+MS
7492.00 86.95 24.28 4370.75 4289.55 3584.52 -3153.71 8.00 5973592.44 587184.50 MWD+IFR+MS
7500.00 86.95 24.28 4371.17 4289.97 3591.80 -3150.43 0.00 5973599.75 587187.69 MWD+IFR+MS
7600.00 86.95 24.28 4376.49 4295.29 3682.82 -3109.36 0.00 5973691.26 587227.66 MWD+IFR+MS
7700.00 86.95 24.28 4381.80 4300.60 3773.84 -3068.29 0.00 5973782.76 587267.63 MWD+IFR+MS
7800.00 86.95 24.28 4387.11 4305.91 3864.87 -3027.22 0.00 5973874.26 587307.59 MWD+IFR+MS
7900.00 86.95 24.28 4392.43 4311.23 3955.89 -2986.15 0.00 5973965.76 587347.56 MWD+-FR+MS
8000.00 86.95 24.28 4397.74 4316.54 4046.91 -2945.08 0.00 5974057.27 587387.52 MWD+IFR+MS
8100.00 86.95 24.28 4403.06 4321.86 4137.93 -2904.01 0.00 5974148.77 587427.49 MWD+IFR+MS
8136.19 86.95 24.28 4404.98 4323.78 4170.88 -2889.15 0.00 5974181.89 587441.95 MWD+IFR+MS
8156.05 86.00 25.00 4406.20 4325.00 4188.89 -2880.88 6.00 5974200.00 587450.00 V-203 L3 T2
8200.00 83.71 23.69 4410.14 4328.94 4228.77 -2862.84 6.00 5974240.08 587467.56 MWD+IFR+MS
8214.88 82.93 23.25 4411.87 4330.67 4242.33 -2856.95 6.00 5974253.71 587473.28 MWD+IFR+MS
8272.30 82.93 23.25 4418.94 4337.74 4294.68 -2834.46 0.00 5974306.33 587495.14 MWD+IFR+MS
8300.00 84.59 23.19 4421.95 4340.75 4319.99 -2823.61 6.00 5974331.76 587505.68 MWD+IFR+MS
8390.18 90.00 23.00 4426.20 4345.00 4402.81 -2788.29 6.00 5974415.00 587540.00 V-203 L3 T3
8400.00 90.05 22.41 4426.20 4345.00 4411.88 -2784.50 6.00 5974424.11 587543.68 MWD+IFR+MS
8449.07 90.30 19.48 4426.05 4344.85 4457.70 -2766.96 6.00 5974470.14 587560.67 MWD+IFR+MS
8500.00 90.30 19.48 4425.79 4344.59 4505.71 -2749.98 0.00 5974518.34 587577.07 MWD+IFR+MS
8600.00 90.30 19.48 4425.27 4344.07 4599.99 -2716.63 0.00 5974613.00 587609.27 MWD+IFR+MS
8700.00 90.30 19.48 4424.75 4343.55 4694.26 -2683.29 0.00 5974707.67 587641.48 MWD+IFR+MS
8800.00 90.30 19.48 4424.24 4343.04 4788.54 -2649.94 0.00 5974802.33 587673.68 MWD+IFR+MS
8900.00 90.30 19.48 4423.72 4342.52 4882.81 -2616.60 0.00 5974896.99 587705.88 MWD+IFR+MS
~~~ ~ s
Sperry-Sun
BP Planning Report
Company: BP Amoco Date: 9/12/2005 Time: 14:34:48 Paget 3
Field: Prudhoe Bay Co-ordinate(NE) Reference; Welt: Plan V-203 (N-A); True North
Site: PB V Pad Vertical. (TVD) Reference: 28.5+52.7 81.2
Welk Pla n V-203 (N-A) Section (VS) Refe rence: Welf (O.OON;O.OOE,342:03Azi)
Wellpath: Plan V203 L3 Survey Calculation Method: Minimum Curvature Dbs Oracle'
Survey
MD Incl. Azim TVD Sys TVD N/S E/W DLS MapN MapE ' 'Tool/Comme' t
ft deg deg ft ft ft ft deg/100ft ft ft
9000.00 90.30 19.48 4423.21 4342.01 4977.09 -2583.25 0.00 5974991.65 587738.09 MWD+IFR+MS
9100.00 90.30 19.48 4422.69 4341.49 5071.37 -2549.91 0.00 5975086.31 587770.29 MWD+IFR+MS
9200.00 90.30 19.48 4422.17 4340.97 5165.64 -2516.56 0.00 5975180.97 587802.49 MWD+IFR+MS
9300.00 90.30 19.48 4421.66 4340.46 5259.92 -2483.22 0.00 5975275.64 587834.70 MWD+IFR+MS
9340.83 90.30 19.48 4421.45 4340.25 5298.41 -2469.60 0.00 5975314.29 587847.85 MWD+IFR+MS
9362.75 91.00 20.00 4421.20 4340.00 5319.04 -2462.20 4.00 5975335.00 587855.00 V-203 L3 T4
9400.00 92.47 20.27 4420.07 4338.87 5354.00 -2449.39 4.00 5975370.11 587867.39 MWD+IFR+MS
9452.45 94.53 20.65 4416.87 4335.67 5403.05 -2431.09 4.00 5975419.37 587885.10 MWD+IFR+MS
9500.00 94.53 20.65 4413.12 4331.92 5447.40 -2414.37 0.00 5975463.92 587901.27 MWD+IFR+MS
9530.38 94.53 20.65 4410.72 4329.52 5475.74 -2403.70 0.00 5975492.38 587911.61 MWD+IFR+MS
9600.00 91.77 20.25 4406.89 4325.69 5540.87 -2379.41 4.00 5975557.79 587935.11 MWD+IFR+MS
9644.77 90.00 20.00 4406.20 4325.00 5582.90 -2364.01 4.00 5975600.00 587950.00 V-203 L3 T5
9656.91 89.67 19.65 4406.24 4325.04 5594.31 -2359.89 4.00 5975611.47 587953.98 MWD+IFR+MS
9700.00 89.67 19.65 4406.49 4325.29 5634.90 -2345.40 0.00 5975652.22 587967.98 MWD+IFR+MS
9800.00 89.67 19.65 4407.07 4325.87 5729.07 -2311.78 0.00 5975746.78 588000.46 MWD+IFR+MS
9900.00 89.67 19.65 4407.66 4326.46 5823.25 -2278.15 0.00 5975841.35 588032.94 MWD+IFR+MS
10000.00 89.67 19.65 4408.24 4327.04 5917.43 -2244.53 0.00 5975935.91 588065.43 MWD+IFR+MS
10100.00 89.67 19.65 4408.82 4327.62 6011.60 -2210.91 0.00 5976030.48 588097.91 MWD+IFR+MS
10200.00 89.67 19.65 4409.41 4328.21 6105.78 -2177.28 0.00 5976125.04 588130.40 MWD+IFR+MS
10300.00 89.67 19.65 4409.99 4328.79 6199.95 -2143.66 0.00 5976219.61 588162.88 MWD+IFR+MS
10400.00 89.67 19.65 4410.58 4329.38 6294.13 -2110.03 0.00 5976314.18 588195.36 MWD+IFR+MS
10500.00 89.67 19.65 4411.16 4329.96 6388.30 -2076.41 0.00 5976408.74 588227.85 MWD+IFR+MS
10506.00. 89.67 19.65 4411.20 4330.00 6393.96 -2074.39 0.00 5976414.41 588229.80 41/2"
105Q6.B2 89.67 19.65 4411.20 4330.00 6394.54 -2074.19 0.00 5976415.00 588230.00 V-203 L3 T6
•
TRANSMITAL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PAR4GRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME ,~f1-' ~.D.~ G-- J?
PTD# ~. D S^ ~~
CHECK WHAT ADD-ONS "CLUE"
APPLIES (OPTIONS)
it is for a new wellbore segment of
Th
MULTI e perm
LATERAL existing well ,
Permit No, API No.
(If API number Production should continue to be reported as
' last two (2) digits a function of .the original API number stated
are between 60-69) above.
PILOT HOLE In accordance with 20 AAC 25.005(f), all
(per records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50 -
70/80) from records, data and Logs acquired
for well (name on permit).
SPACING The permit is approved subject to full
,EXCEPTION compliance with 20 AAC 25.055. Approval to
ent ~i
t is contin
/i
f
~ g
ec
n
perforate and produce
upon issuance of a conservation order
approving a spacing exception.
(Company Name) assumes
the liability of any protest to the spacing
exception that may occur.
DRY DITCH All dry ditch sample sets submitted to the
SAMPLE Commission must be in no greater than 30'
sample intervals from below the permafrost I,
or from where samples are first caught and
i 10' sample intervals through target zones.
Rev: 04/01/05
C\jody\transmittal_checklist
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, ORION SCHR BL OIL -640135 Well Name: PRUDHOE BAY UN GRIN V-203L3 Program DEV ~__ Well bore seg ^~
PTD#:2051710 Company BP EXPLORATION (ALASKA) INC Initial Classffype DEV! 1_OIL GeoArea Unit On/Off Shore On Annular Disposal ^
Administration 1 Permit fee attached __ ______________________________________ __ Yes _
2 Lease numberappropriate_____________________ ___________ Yes_ _______
- ~ -
3 Unique well-name and number - --~--- ------ - - - - - -- Yes- - -- - - ---- - - ------ -
----------------------------------
4 Well located in a-definedpool------------------- _--- Yes- ..-_____ __
5 Well located proper distance from drilling unitboundary_ . _ - _ - - - _ - - . Yes - -
- - -
6 Well located properdistance_fromotherwells________________________ ___ Yes_ -....--...______--___.
- -
7 Sufficientacreageayailablein-drillinqunit________________________________ Yes_ ____
8 If deviated, is-wellboreplat-included---- --..__._____._____-_--_---- Yes_ _______
- - -
9 Operator only affected party - - Yes - - -
10 Operator has appropriate_bondinforce_________________________________ Yes_ .____.__.._.____.____.___.___.______._
11 Permit_canbeissuedwithoutconseryationorder--------------------_.-____ Yes_ _____ -_------_-.________--_---____________--__---_____ ___.__-.--____..--
Appr Date i 12 Permit_canbeissuedwithoutadministrativ_e-approval_________ ______________ Yes- ..---.--________.___--___ __----_____-..-_--
RPC 11/1012005 ! 13 Can permit be approved before 15-daywait Yes
i 14 Well located within area and_sfrata authorized by Injection Order # (put1O# in_comments)_(For_ NA- - - - - - - - - - - - - - -
---- ------------------------------
15 All wells within 114-mile area of [eyiew jdentified (For service well only)- - - - - - - - - - - - - - - NA_ _ - . - - .. - - - - - . - - _ - _ . _ . - , - - _ -
16 Pre-produced injector; duration of pre production less than 3 months-(For_service well only) N_A- - - - _ - . -
17 ACMP-Finding of Consistency-hasbeenissued_for_thisproject___________________ NA__ _____ ______-----___,_____,-------.-_-_____-__-------__- --.__---_- __--_
Engineering ' 18 Canductorstring-provided_____________________ ___________________ NA._ _____ _______---.-_____ __ -----_--_-.
19 Surface casing_proteclsall_knownUSDWs__ NA_ ___.-.....-____--...._________--------- --------------------
20 CMT v_ol_ adeguate_to circulate_on conductor & surf-csg . - - _ - - .... - NA_ - - - - . - . - - - .
21 CMT_u_ol_adegu_ate_totie-in long string to surfcsg__________________________ NA__ ___-.-.-.------_______-------_____--___
22 CMT.willcoyerallknown.productiyehorizons______________________________ No-. ______Slotted,___.:--_-,______-__.__----__-_
- -
23 Casing designs adequate for C,T,B&_permafrost--------------------- --.- Yes- ------,---------------------------- _-- -_ -- ----
24 Adequate tankage or reserve pit - - Yes Nabors_9ES, _ . - - - - - -
25 If_a_re-drill,has_a_10-4.03 for abandonment been approved----------------- --_ NA- --.-..Lateral,_________.----______________.---___._______--.-.-_._______ .--_
26 AdequatewellboreseparationpCOposed-____________________________ Yes- _.------_--_--.-.-
27 If_diverterrequired,doesitmeetregulations--------------------_.-.--_--- NA__ _ ---.Sidetrack.________.__---,.___
Appr Date 28 Drillingfluid_programschematic&equiplistadequate-__-----..-_----_---_--_ Yes_ -_._.MaxMW9,tippg,__.__--_____.__.-._---------- --------------------
WGA 11114!2005 29 BOPEs,_dothe meet reulatign.-
- y g Yes_ _________ ________________________________ _--_---_- --- -_------- _-_--
30 _B_OPE_press rating appropriate; test to_(put prig in comments)- . - - - - . - Yes . .. - Test to 3500 psi. _M$P 1528 psi._
31 Choke_manifoldcompliesw/APtRP-53(May84)______________________-.--. Yes_ -_,______
- ---
32 Work will occur. without operation shutdown______________________---_--. Yes_ _______--__---------_______---------_ _____----__--__--____--.- ------
33 Is pre&ence_ofH2S gas probable--.-------------------------------- No_ ___NotanH2Spad._____---_--______------------- --.-----
34 Mechanical condition of wells within AORyerified(Forservicewellgnly)______________ NA-- --______-_____---_--________------.----_______---_-
Geology 35 Permitcanbeissuedwlohyd[ogen-sulfidemeasures_________________________ Yes_ ___________--.---..__________-----_,._________-----_-___- __------ -----
3fi Data-presented on_potential oye_rpressure zones . . .. . .. . . . .. . . . . .. . . . NA_
----------------------------------------------------------------
Appr Date 37 Seismic analysis of shallow gaszones--.--..-----_______________ _____ NA-_ ,-______-___-----..-.__._
- -
RPC 11114!2005
38
Seabed conditionsuruey_(ifoff-share)-----------------------___---- NA- - -
___...____
39 _Contactnamelphone_for_weeklyprogress_reports[exploratoryonlyj-------------- -- NA__ __--_.--------__-.__ -----_-______----_-_.---._____------.--,-__-_------_
Geologic Engineering Pub
Commissioner: Date: Commissioner: Date om r Date
~rt~ ~ 1 ~ ~~ls G~~s~ // /s-~s ~~'~~" `~
I