Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-0607. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU Z-38 Acid Treatment Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 198-060 50-029-22873-00-00 17029 Conductor Surface Intermediate Production Liner 8917 80 3072 11547 5782 14180 20" 9-5/8" 7" 4-1/2" 8967 31 - 111 30 - 3102 27 - 11574 11247 - 17029 31 - 111 30 - 3075 27 - 8753 8486 - 8917 None 470 3090 5410 7500 14180, 14345 1490 5750 7240 8430 11793 - 16940 4-1/2" 12.6# 13cr80, L80 25 - 11235 8914 - 8929 Structural 4-1/2" HES TNT Packer 11024, 8304 11024, 11179 8430, 8304 Torin Roschinger Area Operations Manager Claire Mayfield Claire.Mayfield@hilcorp.com 907-564-4375 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028245 25 - 8476 Perforations from 11793 - 14155' MD Pump 15-bbls of 15% HCL with 800-psi final treating pressure 77 418 0 316 3748 5864 1714 1666 401 353 N/A 13b. Pools active after work:PRUDHOE OIL 4-1/2" Baker S3 Packer 11179, 8430 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 8:51 am, Jun 28, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.06.27 16:59:35 -08'00' Torin Roschinger (4662) DSR=-6/28/23 RBDMS JSB 063023 WCB 1-31-2024 ACTIVITY DATE SUMMARY 6/18/2023 T/I/O= 1704/1711/229. LRS 72 Acid Treatment (FILL CLEAN OUT). Pumped 5 bbls of 15% HCl acid into the F/L. Pumped 15 bbls of 15% HCl acid and 5 bbls of freshwater into the TBG. Displace the the TBG with 257 bbls of crude. Final T/I/O= 815/1782/248. Daily Report of Well Operations PBU Z-38 LRS 72 Acid Treatment (FILL CLEAN OUT). Pumped 5 bbls() of 15% HCl acid into the F/L. Pumped 15 bbls of 15% HCl acid and 5 bbls of freshwater into the TBG Displace the the TBG with 257 bbls of crude. f • STATE OF ALASKA • • ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown ❑ Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Rednll 0 Perforate New Pool ❑ Repair Well 0 Re-enter Susp Well 0 Other Jet el 9p pl 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 198-060 3. Address: P.O.Box 196612 Anchorage, Development IJ Exploratory 0 AK 99519-6612 Stratigraphic 0 Service 0 6. API Number: 50-029-22873-00-00 7. Property Designation(Lease Number): ADL 0028245 8. Well Name and Number. PBU Z-38 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 17029 feet Plugs measured 14180/14345 feet true vertical 8917 feet Junk measured feet SEP 21 2017 Effective Depth: measured 14180 feet Packer measured See Attachment feet true vertical 8968 feet Packer true vertical See Attachment feet AOGCC Casing: Length: Size: MD: TVD: Burst Collapse: Structural Conductor 77 20"91.5#H-40 30-107 30-107 1490 470 Surface 3072 9-5/8"40#L-80 29-3101 29-3075 5750 3090 Intermediate 11547 7"26#L-80 27-11574 27-8753 7240 5410 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: CANNES NOV Z817 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 426 701 7320 1663 410 Subsequent to operation: 308 644 4384 1478 345 14.Attachments:(required per 20 AAC 25.070.25.071,8 25.283) 15.Well Class after work: Daily Report of Well Operations p Exploratory 0 Development p Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil I3 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data ❑ GSTOR 0 WINJ 0 WAG ❑ GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Peru,Cale Contact Name: Peru,Cale Authorized Title: Petroleum Er•ineer ) Contact Email: Cale.Peru@bp.com Authorized Signature: /,/ Date: C/20//7 Contact Phone: +1 9075644522 Form 10-404 Revised 04/2017 V77.— i d`6/ 1 r (ogil nm,„„--,„... . L 2 iL I,,, Submit Original Only • • Alaska Oil and Gas Conservation Commission RECEIVED 333 West Seventh Avenue Anchorage, AK 99501-3572 SEP 2 1 2017 AOGCC RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary September 20, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Plug for Well Z-38, PTD # 198-060. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • • Packers and SSV's Attachment PBU Z-38 SW Name Type MD TVD Depscription Z-38 TBG PACKER 11024.09 8304.55 4-1/2" HES TNT Perm Packer Z-38 TBG PACKER 11178.72 8430.06 4-1/2" Baker S-3 Hydro Set Packer Z-38 PACKER 11254.58 8491.81 4-1/2" Baker ZAP Packer Z-38 PACKER 14348 8974.38 2-7/8"22FAB30 Packer Z-38 PACKER 14512 8980.57 2-7/8"22FAB30 Packer • d a-0000000 rn o o p CO In N• (4)(4) a � MoccoM m r �C 0o0 0 p0 CO r, O CO I' N Co O s- CO O f� O r- co co cr . co co co co co co CD 'V CO O CA h. O I", to Q) CO N N V' CA N CO CO CO CO 4.0 N In In OOtoOCo - N Cicc i i I i i I i fes.+ coQ co oC3) I� vvOin CV)) N N N N c- iao.0 CO G. o 44, O O pop O C2 co Nit C) JpoU = J O --I M w 4# O J CO Z:3'";.111 to� � � N � Onj '- V O co O ti CV N d) 4 N N . M W � Q COW 0 U W V n < ..LL a a Z Z Z w W W W m m O D ~ Z Z D o C) f/) ZJJHI— • • m co ca m Tr r- CD0346NMOI- 6 4 00 01 L) ODCOCOa) 00 U0 oC4CDCD CD CDC) QDt` N MOCoCD 11 Ti 646g01CD Eco N 66uiy- CO CU N 4 6 CO Ps 00 CD t\ d' M CD Cs f` CD CD C` M to ID 0 OOOODOD000ODOOCD p000000000 C0OCD cn OOCOOCD OOOOOOOCD ODOpCO 0. 0 I- OD O N C) O T- 0 N 0 CO CO N 00 a) 0 0 ▪ 4MCO140000yrCDCDU) M CO ONOCONCD . CD CU ') CO Ns Ns 0 0 ti CO C) - O N- 000 0) Off) CO (h U) W 0 0 0 0 0 0 0) 0 0) 0 0 0) 0 0 0 0 0 0 0) 0 C)) > 0 CO CO 00 CO 00 OO 03 O O CO O OD O O CO 00 O O CO 00 O W 0 W C] O Z LU I-- H 0 W m 55Y (-1 ° .0 00 V 0 0 C) C) LC) O O O O C1) to O O LO O a) O O --I U V W L W •+ r- ct CO CO — co .4 N CO N- CO CA c) cY) C1) Tr cp O a 4J J J Q Q (n w Lr m OCOCOCpCDcn ONT- 4 ter) V' N- COMCONO Q Q Q W CL a ? Z p y- T- r- NNNV) 014 .4 4 � cf) 6T) QD U U U J W W7.71 c) c) a¢ ¢ ¢ 0 _ = Z }- o L- 0 w w a Q 0 t.) CO 2 2 2 0 cn cn cn cn cn �.r • 0. Q N 0 C t co 4 4 0) c) M W 0a) 0a) 00000 UI a) 00 1 O M O M CD CV U) C` y- Ns T- N O C Cf) D C D O Cn N t` ch O W N N- a3OC30) 0T - NOOTr a)— 01 CD ODS V OC7 c N N N N C) 01d y 6n O C4 L 0. a d t = - = FV- O a J area. 2 2 O cn cn cn cn cn 4 CI. 0 C.) O• u_ u_ u_ u_ LL u_ u_ OC CL' Q' OC OC C/) CO C/) U) U) CO CO Cl) Raaaao- aawwwwwaaa. aaaan. a Q ¢ QQaQarLaaaammmmmmmm 0 t d a w J I- D W p C000ODOD OD CD OOIsNNs Ns Ns Ns Ns Ns 0 Ur 0 0 0 0 0 0 0 OD 00 C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W J Z Q- 0 N N N N N N N N N N N N N N N Z "- a CL < W W m ,r d' ,r d' 07 ch O O O O O td) U1 a) C1) a) U1 LO Cn O 0 W W W J N N Ca M M M ch M N N N N N CV N CV z a 0 CD U W W a N- a) a) 000D CO COODODCO00030000 p p L] J J cc a O co Q m m u. LL cn W a m m m z 3 w CO OD op 00 CO 00 CO OD 00 OD 00 00 CO w OD 00 OD OD 00 Cn M 0? c? co c..? M ci) 0? cr) 0? co C? co 0? co Ch Ch M c? C) CO a d a 0 J C7 0w a N N N N N N N NNNN N N N N N N N N N Q Q m m 11 cn cn a = • 0 ¥ m 6 a) i \ o # o In j- I c‘iCi) o .® — ® _ — _0 a o £ c 2 mca ‘•-• ® _ 0) = E o § f a 2 2 _ = = o m u a g. E• kk / � k � b � • L . 0)-0 0 ` o Q •o _ « a \ 0)2 c ._ R m CD 03 a w 2 0 0 15 % t It $ % Q / > - U : 2 33 � - 0 co / -.E. co 2 � k2 cri , ■ o # >.• / / « \ C - 0a) / § 6 � E 0 = 0 ;4. .0. t = m G » ■ — ■ 0 � _/ aa2 .� q % %/ k § y � / kk �• � d £ 0 / arc 7 cc m � « @ & 7 _ % 2 E cti $ LE / CV■ / k E a, R f > 2f �� � ,- & \ 0 � � ) o � �0 ® � %# �� � 2o� , m22 � 5 > • A - » � = ° c\ = CU � Q Li N \ d & f # \ 2 k u f 7 � m £ aq � CD. 2 = f6Ce a, SE) 0Ca 6 $ 0:12 = >,2 » wmooJk � > I0, a) o > �J/ @ ■ & Ct ¥ ■ o o @ @ 0.R Ce 4, 0_a w E • o o m @ ■ _ 0 0 _ 43 § « § � � £ R $ f 2 cu 0 k < § 0 22 _ -3 m f u > U E - cn o n / / _, / �/ « E0)/ wm0 QQ. -§ k / k _� 'it) co U / § k '2 p_ K � / E U CO / Q : m § _/ - GS k-0 C § O n 0 t 2 D � � R2u \ kf7fk0 \ / l' 2k � 2 w - Q w o 3 0 5 al a3 e, w o ■ c , f Q 3 ! Q Q a -0 o £ Q ! o w » m 2 ! 2 & I— < N. N. ¥ / / k / 2 � > � (N a = n In I-7- CO / « • • + TREE= 4-1/16'CM/ I KELLHEA D= FMC Z-38 bAll-t1 I'Nu i ei: IffeLL AINI44-t>IV'a 11 .IV"—4- 1/2"CHROME TBG'''•DEPTH DISCREPANCY BY RIG ACTUATOR= BAKER C ' TGB TALLY KtEG#11235';SHOULD BE ABOVE UR i KB.B_EV= 842 I _ ., I PKR TIEBACK SLV @ 11241',BUT NOTE ON TBG BF,ELEV= 58 61' ' KOP= at'CONDUCTOR - i , ? V TAI I Y SAYS WI FG LS IMSFIZTFO 3-.1/7"INTO TIFRACK 947' I [Max Angle= 9r @ 15224' I /" ......4 Ditum MD= H 11748' 2022' 4-12"/ /-ES X NP,ID=3.813' 'Datum TV D= 8800'SS 0 GAS LFT MANDRELS k 1 ND De/I TYPE VLV LATCH PORI DATE 9-5/8"ES CEMENT STAGE COLLA R 1— 2614' 8 ' 3212 3179J 22 CA DOME' BK 16 10/0801 9-5/8"CSG,404,L-80 BTRS,ID=8 835" i—I 3102' , Li 7 5182 45551 55 CA COME: BK 16 10/08/11 6 6003 5030 53 CA SO BK 22 10/08/11 5 6791 5492 55 CA MAY E3K I 0 06i28/11 4 7574 5949 53 CA DAY BK 0 06128/11 F Minimum ID= 2.375"@ 14508' 11 3 8478 65051 54 1 CA CMY BK , 0 06/28/11 2 9254 69611 54 1 CA ' OW BK 0 06/28/11 4-1/2"BKR PATCH SEAL ASSY i i 1., ..,.. ...,..1 1 10031 75141 37 1 CA EIi4Y BK 1 0 06/28/11 10966' 14-1/2"HES X NP,ID=3.813' 4-1/7 NOFG-C SAF-EE GAUGE '--1 10996' II %CIE SUB,D=3.958" 1 . Z 11029' _17"X 4-1/2'I-ES TNT FKR,40=3,856" 11064' —4-1/2"HES X MP,ID=3 813' 1 14-1/2'THG,12.64,13CR-85 VAM TOP. H 11121' NI I 1.0152 bpf,ID=3,958' i 1............___--i 11149' 1—7'X 4-1/2'OVERSHOT TBG GLIDE 4-1/2-TBG s-rue(evivi 1) H 11128' 1,„,,, r I g - 1 111-68' —14-1/71-IES X 11P,10=3.817 I 11179' 1,_:.7"X 4-1/713KR S-3 PKR ID=3 875' I in—T-1 7. H4 1/2"HES X MP,ID=1813=1 * 1 11223' —14-1/2"FES XN NP MILED TO 3.80'(7/25/03) ; 0 4-1/7 TBG,12.64,L-80 IBT-M, 1-- 11234' I 1, NNI __...— .0152 bpf,O=3958 / \ 11235' L,4 1/7 WLEG,ID=3.958'1 i TOP OF 4-1/2"LNR H 1124T H- 11242' —EIJ4)IT LOGGED 08/14/98 11247' I—7"X 4-1/2"BKR ZXP 4/L142 HGR,ID=') 1 !-74184' !__(-4_1/7 BOT (7)8/25/17) 1 7"CSG,264,L-80 B I hZ-M 0383 bpf,ID=6 276' H 11574' 11-41 k - _14346'ELM I—4 1/7 HES CIBP(05/20/1/) 1 PERFORATION SUMMARY 14347'-14510'1—4-1/2'BKR FAB-1 PKR 1 REF LOG BHCS ON 06/28/98 ID=2.39'(09/22/03) j ANGLE AT TOP FFRF: 51°#11793' 44% Note:Refer to Production DB for historical perf data ailimmir ' 14508' H BKR KBI-4-22 ANCHCR SPF 1 rebRvAL - ' Opn/-§gi 1 DATE ,SEAL ASSY,ID=2 375' SEE PAGE 2 FOR FERF-ORATON DATA )I(/), .11PC Atiftio 1 1 H 1 i 1 :rift atimitt ..„ •o ik; fro%* 12_7/t 180,6.44,I-SO STL.0058 bpf,ID=2.441" — 14610' ••••.,1 t,,...:;' Pr B=D --1 16941' ' 4-1/2'LNR, 12.64,L 80 IBT-M,.0152 bpf,ID,--3.958" H 17029' DATE 1 REV BY CCOANENTS DATE REV BY I COMETS FRUDFICE BAY UNIT 06/30/98i JONeS ORIGINAL COMPLETION 08/15/11 CJKJ PJC CEP/PATCH CORRECTIONS VVL.EIZ-38 06/29/11 I 0-14 121/1,0 10/12/11 SET/PJC XN PALLED(07/25/03) pewir No:'1980600 07/01/11 PJC CIRLG CRAFT CORRECTIONS 10/12/11 SET/PJC GLV C/0(10/08/11) AR ND50-029-22873-00 07/25/11 MSS/PJC1GLV C/0(07/11/11) 08/29/17 ATO/JMD SET CEP(08/25/17) - - SEC 19,1-11N,R12E 970'FNL&100T PAL 107/25/11 CD/PJC!PATCH CORRECTION ri-04/12/i1RRC/PJC MAL DRLG CORRECTIONS BP Exploration(Alaska) i ) 0 • • • + Z-3 8 I [I I I a A 111M I I -a E r I I PERFORATION S1I44ARY REF LOG: BHCS ON 06/28/98 ANGLE AT TOP PERE 5r @ 11793' r I Note:Refer to Reduction DB for leslorical pert data SIZE i SFF1 IITERVAL '01:41/Sclz4_ DAM I I 2-7/8" 6 11793-11813 0 01/04/10-1 1_ 2-7/8' 6 /1824-11844 0 01/04/10 Z Z 2-7/8' 6 11854-11869 I 0 01/04/10 2-7/8' 6 11879- 11889 0 01/04/10 I I 2-7/8' 6 11903-11933 0 01/03/10 2-7/8' 6 12415-12435 2-3/4' 4 12470- 12620 0 07/11/10 0 06/30/98 I I 2-3/4' 4 12705-12760 0 06/30/98 2-3/4' 4 12510- 13170 0 06/30/98 2-3/4' 4 13425-13480 0 06/30/98 / 2-3/4' 4 13550-14155 0 06/30/98 li il 2-3/4' 4 14190-14335 C 06/30/98 2-3/4' 4 14390-14430 C 06/30/98 2-3/4' 4 14690-14750 C 06/30/98 2-3/4' 4 14800-14545 C 06/30/98 I II. 2-3/4' 4 15155-15340 C 06/10/98 2-3/4' 4 f 15425-15805 C 06/10/98 — 2-3/4' 4 16070-16250 C 06/30/98 2-3/4' 4 16340-16940 C 06/30/98 411111111%, aftlllimp . /0( lit 411111114, , 111111% :1111. 111111111* i•IA• lloNs.• Ito rt•• 1.0 ollk ' DATE REV BY COMMENTS DATE REV BY I COMENTS PRUDHOE BAY UNIT 06130198 JONES ORIGINAL COMPLETION i 08/15/11 CJK/PJC I CEP PATCH CORRECTIONS 'AL Z-38 06/29/11 0-14 NINO 10/12/11 SET/PJC XN MILLED(07/25/03) PERMIT No 980600 07/01/11 PX DRLG DRAFT CORRECTIONS 10/12/11 SET!PJC GLV CIO(10/08/11) API No: 50-029-22873-00 07/25/11 MSSJPJC GLV(70(07/11/11) ' 08/29/17 ATO/AID SEE CEP(08/25/17) SEC 19,711N,R12E.970'FNL&1007 FV+.4_ , f 07/25/11 I CD/RIC PATCH CORRECTION L I _ ' r08/12.1111—f PJC FINIAL DRLG ODRRECDONS 1 1 -1 BP Exploration(Alaska) + Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. / (~ ~- ~C_,,~:~ File Number of Well History File PAGES TO DELETE Complete RESCAN Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original- Pages: Other -Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type 'OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by: Beverly Mildred Daretha Lowell Date: '~/.~' /si TO RE-SCAN Notes: Re-Scanned by: Beverly Mildred Daretha Nathan Lowell Date: /si Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator[AKDCWelllntegrityCoordinator©bp.com] Sent: Wednesday,August 21, 2013 6:30 PM To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr; Burton, Kaity; AK, OPS Well Pad Z; Wallace, Chris D(DOA) Cc: AK, D&C DHD Well Integrity Engineer; Walker, Greg(D&C); Holt, Ryan P;AK, D&C Well Integrity Coordinator; Regg, James B(DOA) Subject: OPERABLE: Producer Z-38(PTD#1980600) Passing TIFL Attachments: Producer Z-38(PTD#1980600)TIO Plot.docx All, Producer Z-38(PTD#1980600) passed a TIFL on 08/20/2013 after the inner annulus broke MOASP during a planned plant shutdown. The passing test confirms there are two competent barriers in the wellbore. The well is reclassified as Operable. A copy of the TIO plot is included for reference. Please call with any questions. Thank you, Jack Disbrow SCANNED BP Alaska-Well Integrity Coordinator nwit Global Wells Organization Office: 907.659.5102 WIC Email:AKDCWelllntegrityCoordinator(abp.com From: AK, D&C Well Integrity Coordinator Sent: Wednesday, August 14, 2013 12:00 AM To: AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Burton, Kaity; 'chris.wallace @alaska.gov'; AK, OPS Well Pad Z; 'jim.regg @alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; Climer, Laurie A Subject: UNDER EVALUATION: Producers on Z pad that exceeded MOASP during TAR All, The following producers were found to have sustained casing pressure on the IA over MOASP during a shut down for planned facility maintenance,and are currently classified as Under Evaluation: Z-03A(PTD#2100100) Z-27(PTD#1900310) Z-38(PTD#1980600) Plan Forward: 1. DHD to TIFL once wells are stable post maintenance 1 TIO plots and wellbore schematics have been included for reference. Please call with any questions. Thank you, Laurie Climer l:-lliernalc':Jack Disbrunri BP Alaska - Well Integrity Coordinator GW WIC Office: 907.659.5102 WIC Email: AKDCWe1IIntegrityCoordinator(&,,BP.com 2 Producer Z-38(PTD#1980600)TIO Plot Well:Z-38 4.000 ' 3000- �Tbg f IA 2.033- —.—OA I 00A OOOA On ...� 0►aN 74 052513 060113 06013 061513 06/2Z13 062S13 0770613 07/13;'13 07/2013 0727/13 030313 02,10113-08/77/13 • STATE OF ALASKA ALAS AND GAS CONSERVATION COMMIS • REPO OF SUNDRY WELL OPERA NS 1. Operations Performed: ❑ Abandon ® Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Re -Enter Suspended Well ❑ Alter Casing ® Pull Tubing ❑ Perforate New Pool ❑ Waiver ❑ Other ❑ Change Approved Program ❑ Operation Shutdown ❑ Perforate ❑ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. IS Development ❑ Exploratory ^' 198 - 060 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 ,, 50 - 029 - 22873 - 00 - 00 7. Property Designation: 8. Well Name and Number: ADL 028262 & 028245 PBU Z -38 9. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Oil Pool 10. Present well condition summary Total depth: measured 17029' feet Plugs (measured) 14338' feet true vertical 8917' feet Junk (measured) 14345' feet Effective depth: measured 16955' feet Packer: (measured) 11029 & 11179' feet true vertical 8927' feet Packer: (true vertical) 8309' & 8430' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" 110' 110' 1490 470 I Surface 3072' 9 -5/8" 3102' 3076' 5750 3090 Intermediate 11547' 7" 11574' 8753' 7240 5410 Production Liner 5782' 4 -1/2" 11247' - 17029' 8486' - 8917' 8430 7500 Atft4 JUL 2 0 ZOU Perforation Depth: Measured Depth: Above Plug: 11793' - 14335' True Vertical Depth: 8914' - 8974' Tubing (size, grade, measured and true vertical depth): 4 -1/2 ", 12.6# 13Cr85 / L - 11235' Packers and SSSV (type, measured and true vertical depth): 7" x 4 -1/2" HES 'TNT' packer; 11029' 8309' 7" x 4 - 1/2" Baker 'S packer 11179' 8430' 11. Stimulation or cement squeeze summary: . - . . a,,, L. ' L. Intervals treated (measured): Ail- 1 Treatment description including volumes used and final pressure: gg �@@ t ry 9 t�f tp /��q A4:RA ' `. h & 68:z CM14. t:t1 ;lt$1tiSSI0f 12. Representative Daily Average Production or Injection Data Oil-Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 13. Attachments: ❑ Copies of Logs and Surveys run 14. Well Class after work: :4 Daily Report of Well Operations ❑ Exploratory - Development ❑ Service ❑ Stratigraphic ® Well Schematic Diagram 15. Well Status after work: ❑ GINJ - ® Oil ❑ SUSP ❑ WDSPL ❑ Gas ❑ GSTOR ❑ SPLUG ❑ WAG ❑ WINJ 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Ryan Ciolkosz, 564 -5977 N/A Printed Name Terrie Hubble Title Drilling Technologist // / / 07/ Prepared By Name /Number: Signature ,64_ ( ' II - Phone 564-4628 Date 13 111 Terrie Hubble, 564 -4628 Form 10-404 Revised 10/2010 1 /MS JUL 14 4/27 Submit Original Only 7 -re- m4 Z -38, WeI Iist0 (Pre Rig 9 Work er) Date Summary 4/26/2011 T /I /O= SSV /850/200 Temp =SI PPPOT-T (PASS) PPPOT -IC (PASS) (Pre RWO) PPPOT -T : RU 2 HP BT onto THA 150 psi bled to 0 psi, flush void until clean returns achieved. Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 5000/ 30 minutes. Bled void to 0 psi, RD test equipment, re- installed Alemite caps. Cycle and torque LDS "ET style" all functioned with no problems. PPPOT -IC : RU 2 HP BT onto IC test void 200 psi bled to 0 psi, flush void until clean returns achieved. Pressured to 3500 psi for 30 minute test, 3500/ 15 minutes, 3500/ 30 minutes. Bled void to 0 psi, cycle and torque LDS "ET style" all functioned with no problems. 5/16/2011 WELL SHUT IN ON ARRIVAL. RIG UP SWCP LANOLINE #11. 5/17/2011 DRIFT 4 1/2" TBG WITH 3.70" CENT & 2.50" SAMPLE BAILER TO WRP @ 11,198' SLM. PULL 3.69" WFD WRP FROM 11,198' SLM (11,218' MD). DRIFT THRU 4 1/2" LNR WITH 3.70" CENT & S.BAILER, SAT DOWN IN DEVIATION @ 11,906' SLM, NO SAMPLE. RAN SLB SBHPS PER PROGRAM, GOOD DATA. (USED BF TO KB FOR 27' CORRECTION). WELL LEFT S /I, PAD OP NOTIFIED. 5/19/2011 MIRU. RIH w/ 3.7" OD drift on SWS MGR /CCL carrier to taq at 14338' (patch), Log to 14050'. POH. MU HES 4 1/2" CIBP, RIH. 5/20/2011 RIH w /HES 4 1/2" CIBP. Set (a) 14338',, 2' above patch. POOH. FP to 2500' w/50/50 McOH. JOB COMPLETE. 6/9/2011 T /I /0= 150/530/10. Temp= SI. T & IA FL. AL spool piece dropped. TBG FL near surface. IA FL @ 850' (15 bbls). 6/9/2011 WELL S/I ON ARRIVAL. UNABLE TO PASS 6,335' SLM W/ 3.75" GAUGE RING. RAN 3.70" CENT, 4- 1/2" TEL, 2.50" S- BAILER, LOC TT © 11,215' SLM (20' correction 11,235' MD). FLAGGED WIRE AT 11,186' SLM ( +6' HES)= 11,212' MD. 6/10/2011 SET 4 -1/2" HES COMPOSITE BRIDGE PLUG ON HES DPU, AT 11,192' SLM / 11,212' MD. WELL S/I ON DEPARTURE, DSO NOTIFIED, 6/11/2011 T /I /0= 180/580/0+ Temp =SI MIT TBG 3500 psi FAILED CMIT Tx IA 3500 psi PASSED MIT OA 2000 psi FAILED (RWO screen) Attempt MIT TBG pumped 6.4 bbls of 50° diesel down TBG. IA psi started climbing. Pumped 19.9 bbls of 50° diesel down TBG to reach 3500 psi for CMIT TxIA, 1st test 1st 15 min lost 60/90 psi, 2nd 15 min lost 20/40 psi for a total of 80/130 psi in 30 min . Bled TxIA psi down bled approx. 4 bbls back. MIT -OA: pumped 6.1 bbls crude down OA to attempt MIT. 1st 15 min lost 550 psi, 2nd 15 min lost 90 psi for a total of 640 psi in 30 min. Pumped 2 bbls crude down OA to establish LLR of 0.083 bpm for 10 min. Bled OAP (-1.3 bbls). 6/12/2011 Continue rigging down. Bleed back TxIAP. Tags hung. FWHP's 240/300/0 6/12/2011 WELL SHUT IN ON ARRIVAL. INITIAL T /I /0= 260/325/90 PSI. RIH AND CORRELATE DEPTH USING TUBING TALLY (6/25/98). JET CUT TUBING AT 11128'. POOH. FINAL TWO = 230/325/80 JOB COMPLETED. 6/13/2011 T /I /0= 250/340/100 Temp= SI Circ -out TxIA, CMIT -TxIA PASSED to 500 psi - -2nd attempt - -, MIT -OA PASSED to 1200 psi, MIT -OA PASSED to 2000 psi - -2nd attempt -- ( Pre RWO). Pumped 5 bbls meth, 567 bbls 1% KCL down Tbg up IA taking returns to Z -10. Pumped 80 bbls 50 °F diesel down Tbg, U- tubed TxIA for 1 hr for freeze protect. Freeze protected FL of Z -10 with 8 bbls meth, flushed HL jumper with 5 bbls diesel. CMIT -TxIA: Pressured up TxIA with 1 bbl diesel. TxIA lost 20/10 psi in 1st 15 mins and 0/0 psi in 2nd 15 mins for a total loss of 20/10 psi in 30 min test. MIT -OA to 1200 psi: Pressured up OA with 1.1 bbls diesel. OA lost 60 psi in 1st 15 mins and 10 psi in 2nd 15 mins for a total loss of 70 psi in 30 min test. MIT -OA to 2000 psi: Pressured up OA with .5 bbl diesel. OA lost 40 psi in 1st 15 mins and 0 psi in 2nd 15 mins for a total loss of 40 psi in 30 min test. Tested BPV to 1000 psi -- PASSED -- Final WHPs 0/0/0 Page 1 of 1 • • North ALASKA BP Page t Gf12 Operation Summary Report Common Well Name: Z -38 �_ F AFE No Event Type: WORKOVER (WO) I Start Date: 6/19/2011 1 End Date: 6/29/2011 X4- 00TLX -E (2,500,000.00 ) Project: Prudhoe Bay I Site: PB Z Pad Rig Name /No.: DOYON 14 I Spud Date/Time: Rig Release: 6/29/2011 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z -38 ©84.20ft (above Mean Sea Level) Date I From - To Hrs Task Code NPT 1 NPT Depth 1 Phase Description of Operations (ft) i 6/19/2011 I 12:00 - 00:00 I l i 12.00 1 MOB P I PRE MOVE RIG AWAY FROM W -221 I AND STAGE ON THE OTHER SIDE OF THE PAD. INSTALL THE BRACKETS AND BOOSTER WHEELS FOR I THE RIG MOVE. MAT THE ROAD OFF OF .W-PAD TO THE STATE PAD LOCATED ALONG THE W -PAD ACCESS ROAD. BEGIN MOVING THE RIG. 6/20/2011 00:00 - 12:00 12.00 MOB P PRE MOVE DOWN W -PAD ACCESS ROAD AND STAGE THE RIG AT THE STATE PAD WHILE MATS ARE BEING MOVED AHEAD OF THE I RIG. 12:00 16:00 4.00 MOB 1 P . I PRE I MOVE THE RIG DOWN THE W -PAD ACCESS ROAD TOWARDS THE SPINE ROAD. 1 16:00 - 16:45 1 0.75 MOB 1 P 1 PRE WAIT AT THE SPINE ROAD FOR TRAFFIC TO I I CLEAR IN ORDER TO PROCEED. 16:45 - 17:30 0.75 MOB P PRE MOVE DOWN THE SPINE ROAD, LEFT ONTO 1 THE Z -PAD ACCESS ROAD AND STAGE BESIDE Z -38. 17:30 - 19:00 ' 1.50 MOB P PRE REMOVE THE REAR BOOSTER WHEELS. 19:00 - 21:00 ' 2.00 MOB P 1 PRE INSTALL THE BOP STACK IN THE SUB. 21:00 23:00 2.00 MOB P ' PRE SPOT THE RIG OVER THE WELL, SHIM UP AS NEEDED. 23:00 - 00:00 1.00 r MOB 1 P 1 PRE SKID THE RIG FLOOR INTO POSITION. 6/21/2011 00:00 - 03:00 3.00 • MOB P ' PRE I INSTALL AND ATTACH EXHAUST STACKS, ' GRATING, STEAM LINES, AIR LINES, WATER LINES, CHOKE LINE, BLEED OFF LINE, HOLE FILL LINE, MUD BUCKET LINE, AND GAS BUSTER LINE. 03:00 - 06:00 3.00 MOB I P PRE SPOT THE ROCK WASHER, BEGIN TO TAKE ON FLUID, INSTALL DOUBLE VALVES ON THE TREE, AND FINISH PRE -SPUD CHECKLIST. 06:00 - 08:00 2.00 WHSUR P DECOMP PJSM WITH DSM AND THE RIG CREW. MOBILIZE THE LUBRICATOR TO THE RIG FLOOR AND TEST TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MINUTES EACH. GOOD TESTS. pULL THE BPV. 08:00 - 08:30 0.50 WHSUR P DECOMP RIG UP AND TEST, LINES AND CHOKE MANIFOLD TO THE BLEED TANK TO 250 PSI LOW / 3500 PSI HIGH. GOOD TESTS. 08:30 11:30 3.00 WHSUR P DECOMP PUMP 44 BBLS OF 8.6 PPG SEAWATER DOWN THE IA TAKING RETURNS OUT THE TUBING TO THE OPEN TOP TANK AT 3 BPM WITH 300 PSI CLEANING THE DIESEL OUT OF THE TUBING. SWAP OVER THE LINES AND PUMP DOWN THE TUBING TAKING RETURNS OUT THE IA TO THE OPEN TOP TANK. BEGIN WITH A 35 BBLS SAFE - SURF -O PILL FOLLOWED BY 410 BBLS OF 8.6 PPG SEAWATER AT 4 BPM WITH 400 PSI. 11:30 - 12:00 0.50 WHSUR P DECOMP CONFIRM THE WELL IS DEAD. BLOW DOWN THE LINES AND HOOK UP THE INJECTION LINE TO THE IA. RIG UP TO TEST THE LUBRICATOR AND INSTALL THE TWC. Printed 7/11/2011 10:34:33AM North America - ALASKA - BP . O Page' f 12 .. ration Summary Report ' Common Well Name: Z -38 AFE No Event Type: WORKOVER (WO) 1 Start Date: 6/19/2011 1 End Date: 6/29/2011 X4- 00TLX -E (2,500,000.00 ) 1 Project: Prudhoe Bay Site: PB Z Pad Rig Name /No.: DOYON 14 1 Spud Date/Time: 1Rig Release: 6/29/2011 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z -38 @84.20ft (above Mean Sea Level) Date 1 From - To Hrs I Task . Code NPT I NPT Depth Phase 1 Description of Operations (ft) 12:00 15:30 7 3.50 WHSUR 1 P 1 I I DECOMP TEST THE LUBRICATOR TO 250 PSI LOW / 1 3500 PSI HIGH FOR 5 MINUTES. GOOD TEST. INSTALL THE TW9 AND TEST TO 250 PSI !LOW / 1000 PSI HIGH FOR 5 MINUTES FROM I BELOW. GOOD TEST. TEST FROM ABOVE 1 TO 250 PSI LOW / 3500 PSI HIGH FOR 5 MINUTES. GOOD TEST. 15:30 16:30 1.00 DECOMP WHSUR P , BLOW DOWN THE LINES AND RIG DOWN THE 1 TEST EQUIPMENT. DRAIN THE TREE AND LAY DOWN THE LUBRICATOR. 16:30 - 18:00 1.50 1 WHSUR P DECOMP ' BLEED OFF THE CONTROL LINES AND TUBING HANGER VOID. NIPPLE DOWN THE TREE AND ADAPTER FLANGE. TEST FIT THE ' 4.5" NSCT CROSSOVER IN THE TUBING BOPSUR P -� ------ `---------- - - -�'� DECOMP HANGER. 18:00 - 00:00 ' 6.00 NIPPLE UP 11/ X 13 -5/8" ADAPTER, SPACER _ SPOOL, AND BOP STACK. 6/22/2011 00:00 - 03:00 ' 3.00 , BOPSUR P I DECOMP CONTINUE TO NIPPLE UP THE BOP STACK AND TORQUE TO SPECS. INSTALL THE RISER, FLOW LINE, BLEED OFF LINE, HOLE I FILL LINE, AND FLOW LINE COVERS. INSTALL THE MOUSE HOLE AND AIR UP THE :AIR BOOTS ON THE RISER. INSTALL AND HOOK UP THE ENVIRO -VAC. 03:00 - 03:30 0.50 BOPSUR 1 P DECOMP HOLD PJSM ON TESTING BOPE WITH THE RIG CREW. I - LUSCHE'S CREW HELD A SPILL DRILL, CRT 1_85 SEC. 03:30 12:00 8.50 BOPSUR P DECOMP BEGIN TESTING THE BOPE TO 250 PSI LOW / I I 3500 PSI HIGH WITH 2 -7/8 ", 4 ", AND 4.5" TEST JOINTS. TEST THE ANNULAR WITH 2 -7/8" TEST JOINT. FAILED. TEST THE LOWER 2 -7/8" X 5" VBR'S WITH 2-7/8" TEST JOINT TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 MINUTES EACH TEST. GOOD TESTS. TEST CHOKE j MANIFOLD, UPPER IBOP, MANUAL IBOP, MANUAL CHOKE / KILL AND UPPER 3.5" X 6" 'VBR'S WITH 4" TEST JOINT TO 250 PSI LOW / ' 3500 PSI HIGH FOR 5 MINUTES EACH TEST. GOOD TESTS EXCEPT CHOKE # 6 FAILED LOW PRESSURE AND HIGH PRESSURE TESTS. PERFORM TESTS ON ACCUMULATOR AND HCR KILL LINE GOOD TESTS. - TEST WITNESSED BY BP WSL'S CHRIS KOBUCK AND JOSEPH G. LEBLANC JR. AND ' DOYON TOURPUSHER MIKE SMITH AND TOOLPUSHER NICK MARMON. - STATES RIGHT TO WITNESS WAIVED BY ' BOB NOBLE ON 6/20/2011 @ 17:23. 12:00 - 14:00 2.00 BOPSUR P 1 DECOMP TEST CHOKE VALVE # 3, BLINDS, 4" DEMCO KILL, 4" DART VALVE, TEST WITH 4.5" TEST JT TO 250 PSI LOW / 3500 PSI HIGH FOR 5 MINUTES. CHOKE VAVLE # 6 , LOWER PIPE RAMS WOULD NOT TEST WITH 4.5" TEST JT AND ANNULAR WOULD NOT TEST WITH 2 -7/8" ' TEST JOINT. 14:00 - 14:30 0.50 BOPSUR P DECOMP RIG DOWN TEST EQUIPMENT. - WILLIAMS' CREW HELD SPILL DRILL, CRT 1 109 SEC. Printed 7/11/2011 10:34:33AM ' r'' North America - ALASKA BP - ' Page 3 of Page ' -- ' Aeration Summary Report - - ' . Common Well Name: Z-3-8 -� AFE No Event Type: WORKOVER (WO) Start Date: 6/19/2011 End Date: 6/29/2011 X4- 00TLX -E (2,500,000.00 ) Project: Prudhoe Bay ' Site: PB Z Pad Rig Name /No.: DOYON 14 Spud Date /Time: ; Rig Release: 6/29/2011 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z -38 @84.20ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase ! Description of Operations (hr) (ft) — - 14:30 - 15:30 1.00 BOPSUR ' P DECOMP 'NIPPLE DOWN THE RISER AND FLOW LINE, ' LAY DOWN THE MOUSE HOLE. 15:30 - 22:00 6.50 BOPSUR N SFAL DECOMP CHANGE OUT THE PADDLE AND SEAT ON CHOKE VALVE # 6. CHANGE OUT THE ;ANNULAR PREVENTER ELEMENT AND . I ELEMENT SEALS ON THE LOWER 2 -7/8" X 5" ' VBR'S. ! 22:00 - 00:00 2.00 BOPSUR P i DECOMP NIPPLE UP THE RISER AND FLOW LINE. 6/23/2011 00:00 - 03:00 3.00 BOPSUR P DECOMP TEST CHOKE VALVE # 6 AND 4" FOSV TO 250 PSI LOW /3500 PSI HIGH FOR 5 MINUTES I EACH. GOOD TESTS. TEST LOWER 2 -7/8" X 5" VBR'S WITH 4.5" TEST JOINT TO 250 PSI ' LOW / 3500 PSI HIGH FOR 5 MINUTES. GOOD TESTS. 03:00 - 08:30 5.50 BOPSUR N SFAL DECOMP 'iATTEMPT TO TEST THE ANNULAR ' PREVENTER WITH 2 -7/8" TEST JOINT BUT 'WHILE. WORKING IN NEW ELEMENT, ACCUMULATOR BEGAN HAVING ISSUES. • TROUBLESHOOTING ACCUMULATOR. '- TEST WITNESSED BY BP WSL'S CHRIS • - KOBUCK AND DOYON TOURPUSHER - HAROLD GOUCHENAUER AND TOOLPUSHER NICK MARMON. - STATES RIGHT TO WITNESS WAIVED BY ' BOB NOBLE ON 6/20/2011 © 17:23. 08:30 09:30 1 1.00 BOPSUR P DECOMP PERFORM DRAW DOWN TEST ON MANUAL AND SUPER CHOKES. TEST LOWER 2 -7/8" X 5" VBR'S WITH 4" TEST JOINT TO 250 PSI j LOW / 3500 PSI HIGH FOR 5 MINUTES EACH TEST. GOOD TESTS. TEST THE ANNULAR PREVENTER WITH THE 4" TEST JOINT TO 250 PSI LOW / 3500 PSI HIGH FOR 5 MINUTES. I GOOD TESTS. 09:30 10:00 0.50 BOPSUR P - DECOMP RIG DOWN TESTS EQUIPMENT AND REMOVE _ _ _ _ THE XO FROM THE TEST JOINT. 10:00 - 12:00 2.00 PULL P DECOMP INSTALL THE DUTCH RISER SYSTEM AND RUN IN THE LDS. TEST THE LUBRICATOR TO 250 PSI LOW / 3500 PSI HIGH FOR 5 MINUTES ' ' EACH TEST. GOOD TESTS. PULL TWC. 12:00 - 13:00 1.00 PULL P ' DECOMP MAKE UP XO TO A JOINT OF 4" DRILL PIPE ' AND SCREW INTO THE HANGER. BACK OUT THE LDS. - - -- - - --- - - - - -- -- - -- - - - -- - -- 13:00 - 14:00 1.00 PULL P DECOMP UNSEAT THE HANGER WITH 175K AND ' CIRCULATE A BOTTOMS UP THROUGH THE CHOKE MANIFOLD AT 5 BPM WITH 250 PSI. 14:00 - 15:00 1.00 P PULL DECOMP PULL THE HANGER TO THE FLOOR AND RIG ' UP THE CASING EQUIPMENT. 15:00 - 16:00 1.00 PULL P DECOMP BLOW DOWN ON THE SURFACE LINES AND LAY DOWN THE TUBING HANGER. CHANGE OUT THE ELEVATORS. 16:00 - 19:00 3.00 PULL P DECOMP LAY DOWN 4.5" 12.6# L -80 BTC TO 2175'. RECOVER 57 OUT OF 58 STAINLESS STEEL _ BANDS ON THE CONTROL LINE. 19:00 - 20:00 1.00 PULL P DECOMP RIG DOWN THE CONTROL LINE SPOOLER AND REMOVE FROM THE RIG FLOOR. Printed 7/11/2011 10:34:33AM North America - ALASKA - BP Page-4-Of 12 Report , (xerat�a Summary pa Common Well Name: Z -38 j AFE No - -� u - -- —� LL- Event Type: WORKOVER (WO) Start Date: 6/19/2011 I End Date: 6/29/2011 II X4- 00TLX -E (2,500,000.00 ) I Project: Prudhoe Bay -Site: PB Z Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: 6/29/2011 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z -38 @84.20ft (above Mean Sea Level) Date From - To Hrs Task I Code NPT NPT Depth I Phase Description of Operations (ft) L. (hr) , 20:00 - 00:00 4.00 PULL '- P DECOMP LAY DOWN 4 5" 17 6# L -80 BTC FROM 2175' -, 7812'. RECOVER 3 GLM'S. ONE JOINT HAD A APPROX 3' LONG AND 1/2" SPLIT IN THE !TUBE AND 1 GLM HAD A 3" X 3" HOLE IN THE !BODY OF THE GLM. I - WILLIAMS' CREW HELD KICK WHILE TRIPPING DRILL, CRT 120 SEC. 6/24/2011 '00:00 06:30 6.50 PULL P DECOMP ! CONTINUE PULLING 4.5" COMPLETION FROM . 7812'. RECOVER A TOTAL OF 266 JTS, 7 I GLM'S, 1 SSSV, AND 1 CUT JT. 10.90' LONG WITH A 4-7/8" FLARE ON IT. 06:30 - 07:30 1.00 PULL I P D ECOMP `CLEAR THE FLOOR OF ALL CASING TOOLS I I AND ANY TOOLS NOT NEEDED FOR UPCOMING OPERATIONS. 07:30 - 08:30 1.00 FISH P DECOMP µMOBILIZE BAKER TOOLS TO THE RIG FLOOR. _ - - 'I 08:30 09:00 I 0.50 I WHSUR P DECOMP INSTALL THE WEAR RING AND RILDS. 09 :00 - 11 :30 2.50 FISH DECOMP ! PJSM, MAKE UP 4.5" DRESS OFF BHA # 1 CONSISTING OF THE FOLLOWING: DRESS OFF SHOE . - (4) WASHPIPE EXT. I „- INNER DRESS OFF -MILL 4 -3/4" X 3 -7/8" - WASHOVER BOOT BASKET - DOUBLE PIN SUB � - (2) BOOT BASKETS - 7" CASING SCRAPER - BIT SUB - (2) STRING MAGNETS 1 - LUB. BUMPER SUB I - OIL JARS - PUMP OUT SUB I I 1- XO SUB 11:30 12:00 0.50 FISH . P DECOMP (6) 4 -3/4" DRILL COLLARS SINGLE IN THE HOLE ON 4" DRILL PIPE FROM THE SHED FROM 264' - 727'. 12:00 21:30 9.50 FISH P DECOMP SINGLE IN THE HOLE ON 4" DRILL PIPE FROM !THE SHED FROM 727' - 9014'. UP WT. 165K / DOWN WT. 135K 21:30 - 22:00 0.50 FISH P DECOMP ' MAKE UP 7" RTTS AND SET 34' BELOW THE ROTARY TABLE. 22:00 - 23:00 1.00 FISH P DECOMP RIG UP AND TEST 7" RTTS TO 250 PSI LOW / 1000 PSI HIGH FOR 5 MINUTES EACH TEST. GOOD TESTS. 23:00 - 00:00 1.00 L WHSUR P DECOMP ' PULL WEAR RING AND MAKE UP PACK -OFF REMOVAL TOOL. RUN IN THE HOLE AND J INTO PACK -OFF, BLEED OFF VOID AND BACK OUT LDS. PULL PACK -OFF TO THE FLOOR WITH 75K (25K OVER). 6/25/2011 00:00 01:30 1.50 WHSUR P DECOMP MAKE UP NEW PACK -OFF AND INSTALL WITH 15K DOWN. RUN IN LDS, TEST TO 250 LOW FOR 5 MINUTES AND 4300 PSI HIGH FOR 15 MINUTES. GOOD TESTS. 01:30 - 02:00 0.50 WHSUR P DECOMP INSTALL WEAR RING. 02:00 - 02:30 0.50 FISH P DECOMP MAKE UP RTTS RUNNING TOOL, SCREW INTO THE RTTS, CLOSE THE ANNULAR, UNSEAT THE RTTS AND PULL TO THE RIG ' FLOOR. 02:30 - 03:00 0.50 FISH P DECOMP I LUBRICATE RIG, SERVICE AND INSPECT THE TOP DRIVE, BLOCKS, DRAW WORKS AND I ,BRAKES. Printed 7/11/2011 10:34:33AM North 'America - ALASKA - BP Page 5 of 12 ration Summary Report , Common Well Name: Z-38 AFE No 1 Event Type: WORKOVER (WO) I Start Date: 6/19/2011 I End Date: 6/29/2011 1X4-00TLX-E (2,500,000.00 ) 1 1 I , 1 I Project: Prudhoe Bay I Site: PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release: 6/29/2011 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-38 @84.20ft (above Mean Sea Level) 1 Date , From - To Hrs Task Code I NPT I NPT Depth I Phase Description of Operations (hr) j (ft) 1 _ 03:00 - 05:30 1 2.50 FISH I P 1 I DECOMP SINGLE IN THE HOLE ON 4" DRILL PIPE FROM 1 I THE SHED 9014' - 11100'. - r 1 1 . 05:30 - 08:30 I 3.00 FISH 1 P DECOMP ESTABLISH PARAMETERS OF UP WT 200K / I DOWN WT 150K / ROT WT 175K AT 50 RPM I 1 , I 1 WITH 5K FREE TQ. BREAK CIRCULATION AT 1 : 3 BPM WITH 300 PSI. WASH DOWN AND I 1 I ' TAGGED UP ON STUB AT 11136'. PICK UP AND TURN OFF THE PUMPS AND TAG AGAIN AT 11136'. DRESS OFF THE TOP OF THE , 1 , STUB TO 11137' AND WASHOVER TO 11153'. WENT ON AND OFF THE STUB SEVERAL TIMES WITH NO ISSUES. PICK UP AND TURN , 1 IOFF ROTATION AND PUMPS AND ATTEMPT , 1 1 TO GO OVER THE STUB BUT HUNG UP. 1 1 I , DRESSED OFF THE STUB TO 11138' AND 1 , , I I , I ,WASH OVER TO 11154'. PICK UP AND TURN :OFF ROTATION AND PUMP AND SLIDE OF , . 1 THE STUB WITH NO ISSUES. PUMP HI-VIS . ' , 1 SWEEP SURFACE TO SURFACE AT 3 BPM 1 , WITH 300 PSI AND ROTATE OFF OF THE 1STUB AND INCREASE THE RATE TO 11.3 BPM ! , WITH 3700 PSI. WHILE CIRCULATING OUT 1 ; THE SWEEP SCRAPE FROM 11037' - 11100' 3 . . 'TIMES. TAG UP ON STUB AND ROTATE TO GET STUB INTO WASHPIPE THEN SLACK OFF , , 1 I WITH NO PROBLEM. 08:30 - 12:00 3.50 I FISH P DECOMP I MONITOR THE WELL FOR 10 MINUTES. I 1 I , , . PUMP A DRY JOB AND BLOW DOWN THE SURFACE EQUIPMENT. PULL OUT OF THE HOLE FROM 11100' - 3799'. • , - UNANNOUNCED KICK DRILL WITH LUSCHE'S 1 , CREW. 12:00 - 12:30 ' 0.50 I FISH 1 P , , DECOMP I LUBRICATE THE RIG. L _L 12:30 - 14:00 1.50 FISH I P • DECOMP PULL OUT OF THE HOLE FROM 3799' - 264'. -CARLOS CREW HELD KICK WHILE TRIPPING , 1 DRILL, CRT 98 SEC. 14:00 - 17:00 3.00 FISH P : DECOMP FLOW CHECK AT THE BHA FOR 10 MINUTES. LAY DOWN 4-3/4" DRILL COLLARS, BOOT BASKETS AND JARS. BOOT BASKETS HAD APPROX. 1 GALLON OF METAL SHAVINGS AND 1 STAINLESS STEEL BAND. MAGNETS HAD APPROX 1 GALLON OF METAL SHAVING AS WELL DRESS OFF MILL HAD GOOD SIGNS OF WEAR ON IT AND A PIECE OF 4.5" TUBING APPROX 3/4 OF THE CIRCUMFERENCE OF THE TUBING AND APPROX. 2 INCHES LONG STUCK INSIDE THE WASH PIPE. 17:00 - 19:00 2.00 BOPSUR , P ' DECOMP PULL THE WEAR RING, INSTALL THE UPPER I , TEST PLUG AND MAKE UP CROSS OVERS FOR 2-7/8" AND 3.5" FOSV. Printed 7/11/2011 10:34:33AM North America - ALASKA BP Page 6 of 12 It eration Summary Report Common Well Name: Z-38 _.___----- __. -._ - -- AFE No Event Type: WORKOVER (WO) Start Date: 6/19/2011 ' End Date: 6/29/2011 X4- 00TLX -E (2,500,000.00 ) Project: Prudhoe Bay Site: PB Z Pad Rig Name /No.: DOYON 14 Spud Date /Time: Rig Release: 6/29/2011 Rig Contractor: DOYON DRILLING INC. I UWI: Active Datum: Z -38 @84.20ft (above Mean Sea Level) Date From - To Hrs Task I Code NPT NPT Depth' Phase Description of Operations 19:00 22 (hr) (ft) - 3.00 BOPSUR P DECOMP TEST THE ANNULAR AND LOWER 2 -7/8" X 5" 1 1 VBR'S WITH THE 2 -7/8" TEST JOINT TO 250 PSI LOW / 3500 PSI HIGH FOR 5 MINUTES EACH TEST. GOOD TESTS. TEST THE 2 -7/8" FOSV AND DART VALVE TO 250 PSI LOW / 3500 PSI HIGH FOR 5 MINUTES EACH TEST. GOOD TESTS. TEST THE 3.5" FOSV TO 250 PSI LOW / 3500 PSI HIGH FOR 5 MINUTES ' EACH TEST. GOOD TESTS. TESTS WITNESSED BY BP WSL CHRIS KOBUCK AND ' DOYON TOURPUSHER HARRY GOUCHENAUER. AOGCC REP JEFF JONES WAIVED WITNESS OF TEST AT 18:28 ON 6/24!2011. 22:00 - 23:00 1.00 BOPSUR P DECOMP !RIG DOWN TEST EQUIPMENT AND PULL THE TEST PLUG AND INSTALL THE WEAR BUSHING. 23:00 - 00:00 1.00 FISH P DECOMP !MOBILIZE THE DOUBLE STACK TONGS TO 1 � - THE RIG FLOOR AND RIG UP TO RUN 2 -7/8" PAC HT. 6/26/2011 00:00 - 00:30 0.50 FISH P DECOMP MAKE UP COMPOSITE PLUG MILLING BHA AS FOLLOWS: 3 -5/8" CONVEX JUNK MILL ! -BITSUB 00:30 - 05:00 4.50 FISH P DECOMP PICK UP AND MAKE UP 107 JTS OF 2 -7/8" PAC I HT DRILL PIPE OUT OF THE SHED. 05:00 08:30 3.50 FISH P DECOMP MAKE UP CROSSOVER TO 4" DRILL PIPE AND I BEGIN RUNNING IN ON STANDS OUT OF THE DERRICK FROM 3387' - 11113'. 08:30 - 10:00 1.50 FISH P DECOMP CUT AND SLIP THE DRILLING LINE, INSTALL FOSV 1 JT DOWN THEN SERVICE AND INSPECT TOP DRIVE, BLOCKS AND DRAW WORKS. REMOVE THE FOSV. 10:00 - 10:30 0.50 FISH P DECOMP PICK UP 1 STAND OF 4" DRILLPIPE AND SEE MILL ENTER THE TOP OF THE 4.5" STUB. ESTABLISH PARAMETERS OF UP WT. 175K / DOWN WT. 140K / ROT WT. 160K AT 40 RPM WITH 4K FREE TQ. OBTAIN SPRS AND WASH DOWN FROM 11113' TO 11214' WHERE WE TAGGED THE PLUG. - LUSCHE'S CREW HELD KICK WHILE TRIPPING DRILL, CRT 75 SEC. 10:30 - 12:30 ' 2.00 FISH P DECOMP DISPLACE THE WELL OVER TO CLEAN 8.4 PPG SEAWATER AT 5 BPM WITH 2000 PSI. OBTAIN SPRS WITH NEW FLUID IN THE WELL. 12:30 - 13:30 1.00 FISH P DECOMP CLEAN PITS 1 AND 2 AND REPLACE WITH CLEAN 8.4 PPG SEAWATER. 13:30 14:00 0.50 FISH P DECOMP DRILL PLUG WITH 40 RPM AND 5K TQ AT 5 BPM WITH 1980 PSI. DRILLED THROUGH AT 11214 AND PUSHED DOWN TO 11238'. ONCE PLUG WAS DRILLED WELL WENT ON A ' VACUUM. 14:00 - 14:30 0.50 FISH P — — — DECOMP PULL UP HOLE TO 11206' AND CLOSE THE ANNULAR. BULLHEAD AWAY 75 BBLS OF 8.4 PPG CLEAN SEAWATER WITH 230 PSI. 14:30 - 16:30 2.00 FISH P DECOMP RUN IN THE HOLE FROM 11206' - 14345' PUSHING THE PLUG TO BOTTOM. Printed 7/11/2011 10:34:33AM B arth America - ALASKA - BP Page 7 of 12 eration Summary Report P rY ,P . Common Well Name: Z -38 AFE No Event Type: WORKOVER (WO) I Start Date: 6/19/2011 I End Date: 6/29/2011 X4- 00TLX -E (2,500,000.00 ) Project: Prudhoe Bay Site: PB Z Pad 1 Rig Name /No.: DOYON 14 Spud Date/Time: I Rig Release: 6/29/2011 Rig Contractor: DOYON DRILLING INC. ! UWI: Active Datum: Z -38 @84.20ft (above Mean Sea Level) Date I From - To Hrs Task I Code ! NPT NPT Depth Phase Description of Operations 16:30 23:00 6 50 FISH P (ft) DECOMP FLOW CHECK WELL ON BOTTOM AND WELL I IS TAKING 60 - 70 BPH. PULL OUT OF THE ' HOLE ON ELEVATORS LAYING DOWN THE 4" 1 ;DRILL PIPE FROM 14345' - 6644. 23:00 - 00:00 1.00 FISH ! P DECOMP I BEGIN RACKING BACK 4" DRILL PIPE FROM , 6644' - 4500'. ' - CARLOS CREW HELD A FIRE DRILL, CRT 68 i SEC. - HOLE STILL LOSING 60 -70 BBLS/HR. 6/27/2011 00:00 - 00:30 0.50 FISH P DECOMP ,, CONTINUE TO PULL OUT OF THE HOLE RACKING BACK 4" DRILL PIPE IN THE DERRICK. MONITOR THE WELL FOR 10 MINUTES. 00:30 06:30 6.00 FISH P 1 DECOMP I CHANGE OUT ELEVATORS, XO ON FOSV, RIG UP CASING TONGS, AND LAY DOWN 2 -7/8" I PAC HT DRILL PIPE FROM 338T TO SURFACE. I ' I- HOLE. STILL LOSING 60 -70 BBLS/HR. CREW LUSCHE'S CRAW HELD A KICK WHILE _TRIPPING DRILL, CRT 56 SEC. 06:30 - 07:00 0.50 RUNCOM 1 P ' RUNCMP , PULL THE WEAR BUSHING AND LAY DOWN THE RUNNING/PULLING TOOL. 07:00 10:30 3.50 RUNCOM P • ' RUNCMP RIG UP TO RUN 4.5" 12.6# 13CR -85 VAM TOP I : COMPLETION. CHANGE OUT THE ELEVATOR LINKS, INSTALL THE COMPENSATOR EQUIPMENT, SCHLUMBERGER I -WIRE TOOLS, 4.5" TUBING TONGS, MAKE A DUMMY RUN WITH THE HANGER. 10:30 - 12:00 ' 1.50 RUNCOM P RUNCMP I PJSM AND BEGIN RUNNING 4.5" 12.6#__ 13CR -85 VAM TOP COMPLETION AS j I I FOLLOWS: ! I - 7" 26# X 4 1/2" -180" OVERSHOT TBG GUIDE ! - 4.5" 12.6# 13CR -85 VAM TOP X TC-II PUP ' JOINT - 1 JT (A) 4.5" 12.6# 13CR -85 VAM TOP W /BAKERLOCKED CPLG I - 4.5" 12.6# 13CR -85 VAM TOP BOX X PIN PUP - 4.5" X NIPPLE 9CR 3.813" ID WITH RHC-M ' - 4.5" 12.6# 13CR -80 VAM TOP BOX X TC -II PIN PUP - 4.5" 12.6# 13CR -80 VAM TOP BOX X PIN PUP - 7" X 4.5" HES TNT PACKER - 4.5" 12.6# 13CR -80 VAM TOP BOX X PIN PUP - 4.5" 12.6# 13CR -80 TC -II BOX X VAM TOP PIN ' 'PUP - 4.5" NDPG -C SAPHIRE GUAGE SINGLE SUB - 4.5" 12.6# 13CR -80 TC -Il PIN X VAM TOP BOX PUP BAKER LOK ALL CONNECTION TO THE PACKER AND UTILIZE JET LUBE SEAL GUARD ON ALL OTHER CONNECTIONS. TORQUE TURN TO 4440 FT /LBS. INSTALL A I -WIRE CLAMP ON EVERY JOINT FOR THE FIRST 1000' AND 1 CLAMP ON EVERY OTHER JOINT THE REST OF THE WAY TO SURFACE. TEST THE I -WIRE EVERY 1000'. Printed 7/11/2011 10:34:33AM North America - ALASKA - BP Page 8 of 12 e ration Summary Re orfi . rY P Common Well Name: Z -38 AFE No Event Type: WORKOVER (WO) Start Date: 6/19/2011 End Date: 6/29/2011 TX4- 00TLX -E (2,500,000.00 ) Project: Prudhoe Bay Site: PB Z Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: 6/29/2011 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z -38 @84.20ft (above Mean Sea Level) Date From - To Hrs Task Code NPT ! NPT Depth Phase Description of Operations (hr) ( � 12:00 - 00:00 ' 12.00 I RUNCOM P : RUNCMP CONTINUE RUNNING 4.5" 12.6# 13CR -85 VAM • TOP COMPLETION AS FOLLOWS: I I - 4.5" 12.6# 13CR -85 VAM TOP BOX X PIN PUP I I I I- 4.5" X NIPPLE 9CR 3.813" ID - 4.5" 12.6# 13CR -80 VAM TOP BOX X TC -II PIN I IPUP I 1-22 JTS (1 -22) 4.5" 12.6# 13CR -80 VAM TOP I I I TBG I I - 4.5 12.6# 13CR -80 VAM TOP BOX X PIN PUP ' - GLM -1 4.5" X 1" CAMCO KBG -4 -5 W/ 1" DUMMY & BK -LATCH , 4.5" 12.6# 13CR -80 TC-Il BOX X VAM TOP PIN I PUP - 4.5" 12.6# 13CR -8Q TC-I I PIN X VAM TOP BOX Ii, PUP - 18 JTS ( #23 -40) 4.5" 12.6# 13CR -85 VAM TOP ITUBING II 4.5" 12.6# 13CR -80 VAM TOP BOX X PIN PUP - GLM -2 4.5" X 1' CAMCO KBG -4 -5 W/ 1" DUMMY & BK -LATCH - 4.5" 12.6# 13CR -80 TC -II BOX X VAM TOP PIN I ,PUP . -4.5 12.6# 13CR -80 TC -II PIN X VAM TOP BOX :PUP 18 JTS (#41 -58) 4.5" 12.6# 13CR -85 VAM TOP TUBING 4.5" 12.6# 13CR -80 VAM TOP BOX X PIN PUP GLM -3 4.5" X 1" CAMCO KBG -4 -5 W/ 1" DUMMY & BK -LATCH - 4.5" 12.6# 13CR -80 TC -II BOX X VAM TOP PIN PUP - 4.5" 12.6# 13CR -80 TC-Il PIN X VAM TOP BOX PUP I I - 21 JTS ( #59 -79) 4.5" 12.6# 13CR -85 VAM TOP ' ITUBING ' - 4.5" 12.6# 13CR -80 VAM TOP BOX X PIN PUP ' - GLM -4 4.5" X 1" CAMCO KBG -4 -5 W/ 1" DUMMY & BK -LATCH - 4.5" 12.6# 13CR -80 TC-Il BOX X VAM TOP PIN PUP ' 4.5" 12.6# 13CR -80 TC -II PIN X VAM TOP BOX ' PUP - 18 JTS ( #80 -97) 4.5" 12.6# 13CR -85 VAM TOP TUBING - 4.5" 12.6# 13CR -80 VAM TOP BOX X PIN PUP - GLM -5 4.5" X 1" CAMCO KBG -4 -5 W/ 1" DUMMY & BK -LATCH - 4.5" 12.6# 13CR -80 TC -II BOX X VAM TOP PIN PUP - 4.5" 12.6# 13CR -80 TC -II PIN X VAM TOP BOX I : PUP - 18 JTS ( #98 -115) 4.5" 12.6# 13CR -85 VAM TOP TUBING - XO PUP 4.5" 12.6# 13CR -80 TC -I I BOX X VAM TOP PIN - GLM -6 4.5" X 1" CAMCO KBG -4 -5 W/ 1" I DUMMY & BK -LATCH I - XO PUP 4.5" 12.6# 13CR -80 TC -II PIN X VAM I TOP BOX - 19 JTS ( #116 -134) 4.5" 12.6# 13CR -85 VAM TOP TUBING - XO PUP 4.5" 12.6# 13CR -80 TC -I I BOX X VAM Printed 7/11/2011 10:34:33AM North America - ALASKA - BP Page 9 of 12 eration Summary Report Common Well Name: Z -38 AFE No Event Type: WORKOVER (WO) Start Date: 6/19/2011 1 End Date: 6/29/2011 X4- 00TLX -E (2,500,000.00 ) Project: Prudhoe Bay Site: PB Z Pad 1 Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: 6/29/2011 Rig Contractor DOYON DRILLING INC. ! UWI: Active Datum: Z -38 @84.20ft (above Mean Sea Level) Date From - To Hrs I l Task Code NPT NPT Depth Phase Description of Operations ft TOP PIN - GLM -7 4.5" X 1" CAMCO KBG -4 -5 W/ DCK -2 & BEK -LATCH - XO PUP 4.5" 12.6# 13CR -80 TC -II PIN X VAM TOP BOX - 47 JTS ( #135 -181) 4.5" 12.6# 13CR -85 VAM TOP TUBING XO PUP 4.5" 12.6# 13CR -80 TC -II BOX X VAM TOP PIN - GLM -8 4.5" X 1" CAMCO KBG-4 -5 W/ 1" ' DUMMY & BK -LATCH XO PUP 4.5" 12.6# 13CR -80 TGII PIN X VAM TOP BOX 14 JTS ( #182 -195) 4.5" 12.6# 13CR -85 VAM TOP TUBING UTILIZE JET LUBE SEAL GUARD ON ALL ! OTHER CONNECTIONS. TORQUE TURN TO 14440 FT /LBS. INSTALL A I -WIRE CLAMP ON EVERY JOINT FOR THE FIRST 1000' AND 1 CLAMP ON EVERY OTHER JOINT THE REST OF THE WAY TO SURFACE. TEST THE I -WIRE EVERY 1000'. - CARLOS CREW HELD TABLE TOP KICK , WHILE DRILLING DRILL. i - 6/28/2011 00:00 - 04:30 4.50 RUNCOM P RUNCMP CONTINUE RUNNING 4.5" 12.6# 13CR -85 VAM TOP COMPLETION AS FOLLOWS: - 14 JTS ( #195 -209) 4.5" 12.6# 13CR -85 VAM TOP TUBING 4.5" 12.6# 13CR -80 TGII BOX X VAM TOP PIN PUP - 4.5" X NIPPLE 9CR W/ 3.813" ID PKG BORE TC -I ; - 4.5" 12.6# 13CR -80 VAM TOP BOX X TC-Il PIN XO PUP - 46 JTS ( #210 -255) 4.5" 12.6# 13CR -85 VAM I TOP TUBING PICK UP JT # 256, # 257, AND # 258. SEE FIRST SET OF SHEAR SCREWS 28' IN ON JT # 258 SHEAR AT 8K CONTINUE IN AND SEE SECOND SET OF SHEAR SCREWS 36' IN SHEAR AT 9K AND NO GO AT 39' IN ON JT. 258. LAY DOWN JT # 257 AND MAKE UP HANGER AND LAND IN THE HANGER. - 2 JTS ( #256 -257) 4.5" 12.6# 13CR -85 VAM TOP TUBING - PUP 4.5" 12.6# 13CR -80 TGII PIN X VAM TOP PIN 11" TUBING HANGER BODY UTILIZE JET LUBE SEAL GUARD ON ALL OTHER CONNECTIONS. TORQUE TURN TO 4440 FT /LBS. INSTALL Al-WIRE CLAMP ON EVERY JOINT FOR THE FIRST 1000' AND 1 CLAMP ON EVERY OTHER JOINT THE REST OF THE WAY TO SURFACE. TEST THE I -WIRE I EVERY 1000'. 04:30 - 05:00 0.50 RUNCOM P RUNCMP 'TERMINATE I -WIRE AND RUN IN LOCK DOWN SCREWS. Printed 7/11/2011 10:34:33AM , . ' North America - ALASKA - BP . Page 10 of 12 t eration Summary Report Common Well Name: Z-38 AFE No Event Type: WORKOVER (WO) Start Date: 6/19/2011 End Date: 6/29/2011 X4-00TLX-E (2,500,000.00 ) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release: 6/29/2011 Rig Contractor: DOYON DRILLING INC. 1UWI: Active Datum: Z-38 @84.20ft (above Mean Sea Level) Date From - To 1 Hrs 1 Task Code 1 NPT , NPT Depth Phase Description of Operations (hr) , (ft) 05:00 - 09:00 1 4.00 RUNCOM P ' RUNCMP 4 PJSM. REVERSE CIRCULATE IN COMPLETION 1 , 1 FLUID AS FOLLOWS: 170 BBLS CLEAN SEAWATER 110 BBLS CORROSION INHIBITED SEAWATER 96 BBLS CLEAN SEAWATER - 3 BPM, 700 PSI .. -i-- 09:00 - 13:30 4.50 RUNCOM P 1 RUNCMP ' INSTALL LANDING JOINT AND DROP 1 1 , , 1 BALL&ROD REMOVE LANDING JOINT AND LAY DOWN SAME 1 : • ' PRESSURE UP TUBING TO 250 PSI LOW FOR 1 , 5 MINUTES INCREASE PRESSURE TO 3,500 PSI TO SET PACKER AND HOLD FOR 30 MINUTES REDUCE TUBING PRESSURE TO 2,000 PSI PRESSURE UP ON 4-1/2" X 7" ANNULUS TO 250 PSI FOR 5 MINUTES , 1 1 , INCRESE ANNULUS PRESSURE TO 3,500 PSI , AND MONITOR 30 MINUTES , 1 , MONITOR PRESSURES FOR ADDITIONAL 90 1 , , 1 , , 1 MINUTES 13:30 - 14:00 0.50 1 RUNCOM P RUNCMP BLEED ANNULUS PRESSURE TO ZERO BLEED TUBING PRESSURE TO ZERO 14:00 - 15:00 1.00 RUNCOM P 1 RUNCMP PRESSURE UP TUBING TO 250 PSI FOR 5 MINUTES INCREASE PRESSURE TO 3,500 PSI AND HOLD FOR 30 MINUTES , . - 2.5 BBLS TO REACH TEST PRESSURE - LOST 0 PSI IN FIRST 15 MINUTES . : 1 . 1 - GAINED 15 PSI IN SECOND 15 MINUTES , , 1 REDUCE TUBING PRESSURE TO 2,000 PSI 1 , PRESSURE UP ANNULUS TO 250 PSI FOR 5 1 . , MINUTES 1 : 1 1 INCREASE ANNULUS PRESSURE TO 3,500 PSI AND HOLD FOR 30 MINUTES - 3.8 BBLS TO REACH TEST PRESSURE 1 , ! , - GAINED 5 PSI IN FIRST 15 MINUTES - GAINED 15 PSI IN SECOND 15 MINUTES - 3.8 BBLS RETURNED - TESTS WITNESSED BY DOYON TOOLPUSHER NICK MARMON AND BP WSL JOEY LEBLANC 15:00 - 16:00 1.00 RUNCOM P RUNCMP ' MONITOR TUBING AND ANNULUS PRESSURES BLEED OFF ANNULUS PRESSURE, FOLLOWED BY TUBING PRESSURE 16:00 - 16:30 0.50 RUNCOM P RUNCMP WAIT ON ORDERS FROM TOWN TUBING AND IA TEST APPROVED BY WTL MIKE SCHULTZ 16:30 - 17:00 0.50 RUNCOM 1 P RUNCMP PRESSURE UP TUBING TO 2,000 PSI PRESSURE UP ANNULUS TO 3,500 PSI 1 BLEED OFF TUBING AND SHEAR DCK VALVE - VALVE SHEARED AT 900 PSI TUBING PRESSURE CIRCULATE THROUGH SHEAR VALVE BOTH WAYS TO CONFIRM OPEN - CIRCULATING 2 BPM, 470 PSI - REVERSE CIRCULATING 2 BPM, 440 PSI Printed 7/11/2011 10:34:33AM . . , . . . North America : - ALASKA:- BP ,' - '. , ' . . :..- , , ... ,. .' ' Page 11 of 12 . . . . . - ' ' ' , ■ . . , - ' : '' ' - . eration Summ Report . . . - . ' , . . . . ■ . ,. . , - _ . . . 1 . - . . . .,■■ . - . . . ,, ' _ Common Well Name: Z-38 ! AFE No Event Type: WORKOVER (WO) Start Date: 6/19/2011 End Date: 6/29/2011 X4-00TLX-E (2,500,000.00 ) 1 ! i H Project: Prudhoe Bay ! Site: PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release: 6/29/2011 Rig Contractor: DOYON DRILLING INC. , UWI: Active Datum: Z-38 @84.20ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth ' Phase Description of Operations ! „ 1 ' (hr) 1 1 1 , , (ft) ! 17:00 - 18:00 1 1.00 - BOPSUR P „ 1 RUNCMP DRAIN BOP STACK ! . FMC FIELD TECH TO INSTALL TWC IN TUBING ! , HANGER . 1 , 1 „ . . . ' - 4-1/2” CAMERON TYPE 'I-I' TWC . . , . RIG UP TO TEST TWC . . ! 18:00 - 19:00 ' 1.00 BOPSUR P „ , RUNCMP i TEST TVVC FROM ABOVE - 250 PSI LOW, 3,500 PSI HIGH . , : . TEST TWC FROM BELOW ! , ' - 250 PSI LOW, 1,000 PSI HIGH , : 1 . --2 19:00 - 19:30 0.50 BOPSUR P 1 ! RUNCMP !BLOW DOWN CHOKE AND KILL LINES, HOLE I 1 „ 1 , 4 1 , FILL LINE AND STANDPIPE BLEEDER LINE 19:30 - 22:00 ' 2.50 ! BOPSUR ' P . , RUNCMP ' PULL RISER „DISCONNECT CHOKE LINE FROM CHOKE , . . HCR . , . : NIPPLE DOWN BOP STACK AND STAND BACK ON STUMP : . 22:00 - 22:30 . 0.50 WHSUR ! P . 1 RUNCMP lNIPPLE UP TUBING HEAD ADAPTER AND PREPARE I-WIRE FOR TERMINATION 22:30 - 23:30 ' 1.00 WHSUR 1 P ! ! RUNCMP FILL ADAPTER VOID AND PRESSURE TEST ' ! 1 1 ADAPTER FLANGE . . . , . - 250 PSI LOW FOR 5 MINUTES, 5,000 PSI , 1 : HIGH FOR 10 MINUTES . . - GOOD TEST . ' 23:30 - 00:00 I , 0.50 - - ' WHSUR . N ' HMAN -0.30 ' RUNCMP NIPPLE DOWN TUBING HEAD ADAPTER 1 - ADAPTER ORIENTED INCORRECTLY 6/29/2011 ! 00:00 - 01:30 1.50 WHSUR N HMAN , RUNCMP „ FINISH RE-ORIENTING TUBING HEAD ADAPTER . . . : . „ . 1RIO UP TEST EQUIPMENT AND TEST , . . HANGER VOID . . . ! , . 1 . - 250 PSI LOW FOR 5 MINUTES - 3,500 PSI HIGH FOR 10 MINUTES :-- , 01:30 - 02:30 1.00 ! WHSUR 1 ' P . ! RUNCMP TERMINATE I-WIRE AND PERFORM CONDUCTIVITY TEST . ! . - GOOD TEST . ! „ t" : NIPPLE UP TREE 1 . „ . „ _. . 02:30 - 04:00 ! 1.50 : WHSUR ' P ' RUNCMP !FILL TREE WITH DIESEL FUNCTION ALL TREE VALVES . . PRESSURE TEST TREE - 250 PSI LOW FOR 5 MINUTES : . - 5,000 PSI FOR 5 MINUTES . , . 04:00 - 05:00 „ 1.00 WHSUR ' P ' ' RUNCMP !RIG UP DSM LUBRICATOR PRESSURE TEST AGAINST BOTTOM MASTER . ' VALVE : . , . . . - 250 PSI LOW FOR 5 MINUTES : . . ! . , - 3,500 PSI HIGH FOR 5 MINUTES . . ., . : . . . SPOT LITTLE RED HOT OIL TRUCK WHILE . , RIGGING UP LUBRICATOR 05:00 - 05:30 ' 0.50 WHSUR P ' RUNCMP PULL TWC : . 05:30 - 06:00 ! 0.50 : WHSUR ' P , . ! RUNCMP ' RIG UP TO FREEZE PROTECT WELL Printed 7/11/2011 10:34:33AM arth America - ALASKA BP Page 12 of 12 er ation Summa ' Re ort P P . Common Well Name: Z -38 AFE No Event Type: WORKOVER (WO) Start Date: 6/19/2011 End Date: 6/29/2011 X4- 00TLX -E (2,500,000.00 ) Project: Prudhoe Bay Site: PB Z Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: 6/29/2011 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z -38 @84.20ft (above Mean Sea Level) Date 11 From - To 1 Hrs 1 Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) — - — 06:00 10:00 WHSUR 4.00 P RUNCMP 1PRESSURE TEST LITTLE RED TREATING LINES • FREEZE PROTECT WELL WITH 75 BBLS 70 DEGREE DIESEL . 1- 1.5BPM,460PSf 1- FINAL CIRCULATING PRESSURE 600 PSI 'HOOK UP JUMPER FROM IA TO TREE ALLOW DIESEL FREEZE PROTECT TO I 1U-TUBE FOR 1 HR - TUBING AND IA PRESSURES AT 100 PSI BLEED BACK 2 BBLS, ALLOW WELL TO , U -TUBE FOR 30 MINUTES, AND BLEED BACK ADDITIONAL 2 BBLS . - TUBING AND IA PRESSURES AT 95 PSI BLEED BACK 5 BBLS - 9 BBLS TOTAL BLED BACK , ' - TUBING AND IA PRESSURES AT 75 PSI 10:00 - 11:00 1.00 WHSUR P I RUNCMP HOLD RIG EVACUATION DRILL j • - DRILL TO COMPLY WITH MIRU 1 . REQUIREMENTS FOR UPCOMING Z -67 WELL PROGRAM ACTIVATE EMERGENCY SHUT -DOWN TO CONFIRM SWITCH FUNCTIONS HOLD AAR FOLLOWING DRILL 11:00 - 12:30 1.50 WHSUR ' P RUNCMP ! RIG UP DSM LUBRICATOR TO TREE AND . ' ,TEST ' - 250 PSI LOW, 3,500 PSI HIGH FOR 5 MINUTES EACH 12:30 - 13:30 1.00 WHSUR P RUNCMP INSTALL 4 -1/2" CAMERON TYPE 'H' BPV IN ,TUBING HANGER PROFILE USING DSM LUBRICATOR 13:30 - 14:30 1.00 WHSUR P RUNCMP i TESTBPV '- UTILIZE LITTLE RED TO TEST WITH DIESEL TO MAINTAIN FREEZE PROTECT FLUID I 250 PSI LOW, 1,000 PSI HIGH FOR 5 MINUTES EACH 14:30 21:00 6.50 WHSUR P RUNCMP INSTALL BLIND FLANGES, 1/4 TURN VALVES, PRESSURE GAUGES, AND NEEDLE VALVES i ON IA AND OA SIDE OUTLET VALVES TEST IA AND OA BLIND FLANGES AGAINST SIDE OUTLET VALVES PRIOR TO RELEASING RIG - IA TEST TO 3,700 PSI FOR 5 MINUTES ' - OA TEST TO 2,500 PSI FOR 5 MINUTES SECURE RIG RIG RELEASED AT 21:00 HRS 6/29/2011 Printed 7/11/2011 10:34:33AM TREE = 4 -1/16" C PJC DRAF1� 38 SAFETY N WELL ANGLE >70° @11939' * * *4 - _WELLHEAD_ = 1/2" CHROWBG * ** DEPTH DISCREPANCY BY RIG ACTUA = � FM BAKE2 C TGB TALLY WLEG @ 11235'; SHOULD BE ABOVE LNR KB. ELEV = 84.2' 1 PKR TIEBACK SLV @ 11241', BUT NOTE ON TBG BF. ELEV = _�__ 58.61' 120" CONDUCTOR H ? 1./ TALLY SAYS WLEG IS INSERTED 3 -1/2' INTO TIEBACK. KOP = -. 947' Max Angle ,= 97' @ 15224' Datum MD = 11748' 2022' I -14 -1/2" HES X NIP, ID = 3.813" 1 Datum TVD = — 8800' SS GAS LIFT MANDRELS STI MD I TVD I DEV I TYPE' VLV !LATCH PORT DATE 9-5/8" ES CEMENT STAGE COLLAR H 2614' 8 3212 3179 22 CA DMY BK 0 06/28/11 7 5182 4555 55 CA DCK BEK — 06/28/11 9 -5/8" CSG, 40 #, L -80 BTRS, ID = 8.83 3102' 14508 Minimum ID = 2.375" 6 6003 5030 53 CA DMY BK 0 06/28/11 5 6791 5492 55 CA DMY BK 0 06/28/11 ^ 4 7574 5949 53 CA DMY BK 0 06/28/11 V 3 8478 6505 54 CA DMY BK 0 06/28/11 4 -1/2" BKR PATCH SEAL ASSY 2 9254 6961 54 CA DMY BK 0 06/28/11 1 10031 7514 37 CA DMY BK 0 06/28/11 4-1/2" NDPG -C SAPHIRE GAUGE -I 10996' 1 - 10966' I-14-1/Z' HES X NIP, ID = 3.813" 1 SINGLE SUB, ID = 3.958" i�� ICA 11029' 1 1 7" X 4-1/2" HES TNT PKR, ID = 3.856" 1 I 11064' H4-1/2" HES X NIP, ID = 3.813" 1 4 -1/2" TBG,12.6 #, 13CR -85 VAM TOP, -1 11121' k. .0152 bpf, ID = 3.958" N 11149' 1--17" X 4 -1/2" OVERSHOT TBG GUIDE 1 4 -1/2" TBG STUB (6/12/11) H 11128' 11168' H 4 -1/2" HES X NIP, ID = 3.813" I = , I M 1 1 1 7 9 ' 1_1 7" X 4 -1 /2" BKR S -3 PKR, ID = 3.875" 1 • 11202' 1--14 -112" HES X NIP, ID = 3.813" 1 I 11223'_14 -'t/2" HES XN NIP, ID = 3.725" 1 4-1/2" TBG,12.6 #. L -80 IBT -M, 11234' .0152 bpf, ID = 3.953" TOP OF TIEBACK SLV 1 11241' 1- 11235' 1_F-1/2" WLEG, ID = 3.958" : 11242' 1 ELMD TT LOGGED 08/14/98 1 11247' H7" X 4-1/2" BKR ZXP PKR w / LNR HGR, ID = ? 1 7" CSG, 26 #, L -80 BTRS -M, .0383. bpf, ID = 8 11574' I-4 14338' 1-1 -112" HES CIBP (05120/11) 1 14346' - 14510' 1- 4 -1/2" BKR FAB -1 PKR, ID = 2.39" (09/22/03) ` 14508'-1 BKR KBH -22 ANCHOR PERFORATION SUMMARY , SEAL ASSY, ID = 2.375" REF LOG: BHCS ON 06128/98 i/ I ANGLE AT TOP PERF: 51° 0 11793' 11111111%, Note: Refer to Production DB for historical perf data .lit SIZE I SPF I INTERVAL 1 Opn /Sqz 1 DATE � iw, „, . SEE PAGE 2 FOR PERFORAATON DATA 2 -7/8” STL TBG, ID = 2.377" I 14510' j� PBTD H 16955' 7 4 -1/2" LNR, 12.6#, L -80 IBT-M, .0152 bpf, ID= 3.958" 1-1 17029' DATE REV BY COMMENTS T' I DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/30/98 JONES ORIGINAL COM PLETION WELL: Z -38 06/29/11 0-14 RWO PERMIT No: I 1980600 07/01/11 PJC DRLG DRAFT CORRECTIONS API No: 50- 029 - 22873 -00 SEC 19, T11 N, R12E, 970' FNL & 1007' FWL BP Exploration (Alaska) • Z-38 • • I 1 L ■ a D 1 z 1 PERFORATION SUMMARY REF LOG: BHCS ON 06/28/98 l ANGLE AT TOP PERF: 51 ° @ 11793' Note: Refer to Production DB for historical perf data 1 SIZE SPF INTERVAL Opn /Sqz DATE 2 -7/8" 6 11793 - 11813 0 01/04/10 E 2 -7/8" 6 11824 - 11844 0 01/04/10 2 -7/8" 6 11854 - 11869 0 01/04/10 , 2 -7/8" 6 11879 - 11889 0 01/04/10 2 -7/8" 6 11903 - 11933 0 01/03/10 2 -7/8" 6 12415 - 12435 0 07/11/10 1 2 -3/4" 4 12470 - 12620 0 06/30/98 i 2 -3/4" 4 12705 - 12760 0 06/30/98 \ 2 -3/4" 4 12810 - 13170 0 06/30/98 2 -3/4" 4 13425 - 13480 0 06/30/98 0 2 -3/4" 4 13550 - 14155 0 06/30/98 2 -3/4" 4 14190 - 14335 0 06/30/98 2 -3/4" 4 14390 - 14430 C 06/30/98 2 -3/4" 4 14690 - 14750 C 06/30/98 Al 1111. , 2 -3/4" 4 14800 - 14845 C 06/30/98 2 -3/4" 4 15155 - 15340 C 06/30/98 — 2-3/4" 4 15425 - 15805 C 06/30/98 2 -3/4" 4 16070 - 16250 C 06/30/98 2 -3/4" 4 16340 - 16940 C 06/30/98 I a ` a' a 1 401 I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/30/98 JONES ORIGINAL COMPLETION WELL: Z -38 06/29/11 D-14 RWO PERMIT No: 1980600 07/01/11 PJC DRLG DRAFT CORRECTIONS API No: 50- 029 - 22873 -00 SEC 19, T11 N, R12E, 970' FNL & 1007' FWL BP Exploration (Alaska) STATE OF ALASKA ALASK~ AND GAS CONSERVATION COMMISSI REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate0 Other ^ Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver^ Time Extension ^ Change Approved Program ^ Operat. Shutdown ^ Perforate ~ Re-enter Suspended Well ^ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: .Permit to Drill Number: Name: Development ^~ Exploratory ^ 198-0600 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ .API Number: Anchorage, AK 99519-6612 50-029-22873-00-00 8. Property Designation (Lease Number) : ~ 9. Well Name and Number: ADLO-028245 ~` PBU Z-38 10. Field/Pool(s): '~ PRUDHOE BAY FIELD ! PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 17029 feet Plugs (measured) None feet true vertical 8917.25 feet Junk (measured) None feet Effective Depth measured 16955 feet Packer (measured) 3626 3665 11179 true vertical 8927 feet (true vertical) 3550 3583 8430 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20"91.5# H-40 31 - 111 31 - 111 1490 470 Surface 3072 9-5/8" 40# L-80 30 - 3102 30 - 3077 5750. 3090 Intermediate Production 11547 7" 26# L-80 27 - 11574 27 - 8753 7240 5410 Liner 5782 4-1/2" 12.6# L-80 11247 - 17029 8486 - 8917 8430 7500 Liner 164 2-7/8" 6.5# L-80 14348 - 14512 8974 - 8981 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# L-80 25 - 11235 25 - 8476 2-7/8"6.5# L-80 3676-3676 3550-3593 Packers and SSSV (type, measured and true vertical depth) 2-7/8" Baker KB Packer 3626 3550 2-7/8" Baker KB Packer 3665 3583 4-1/2" Baker S-3 Hvdro Set Packer 11179 8430 4-1/2" Baker ZXP Packer 11247 8486 2-7/8" 22fab30 gkr 14348 8974 2-7/8" 22fab30 pkr 14512 12. Stimulation or cement squeeze summary: ~ ,ti>~ „ ~7 i"s ~~'; ~ ~~~ ~' ~ ~ ~~ ~~~ j Intervals treated (measured): w. a'~ ~, w~ `` '~~ ~ G;(.i~: 2 ~ 201p Treatment descriptions including volumes used and final pressure: ~~~~Ir~ ~t ~~ C+~. II~~ISSit)fl r 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: SI Subsequent to operation: 14. Attachments: .Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ^~ Service ^ Daily Report of Well Operations X .Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A ff C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preb Title Data Management Engineer Signature Phon 564-4944 Date 7/20/2010 --- - - ---- ~ 7.ZZ /d Z-38 198-060 PFRF OTTO[`HMFNT • • Sw Name Operation Date Perf Operation Code - -_ Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base Z-38 6/30/98 PER 12,470. 12,620. 8,991.91 8,978.93 Z-38 6/30/98 PER 16,070. 16,250. 8,930.5 8,951.65 Z-38 6/30/98 PER 15,425. 15,805. 8,967.69 8,935.96 Z-38 6/30/98 PER 15,155. 15,340. 8,995.25 8,975.46 Z-38 6/30/98 PER 14,800. 14,845. 8,995.88 8,998.38 Z-38 6/30/98 PER 14,690. 14,750. 8,988.02 8,992.25 Z-38 6/30/98 PER 16,340. 16,940. 8,959.99 8,928.6 Z-38 6/30/98 PER 14,190. 14,335. 8,967.9 8,973.68 Z-38 6/30/98 PER 13,550. 14,155. 8,942.88 8,966.74 Z-38 6/30/98 PER 13,425. 13,480. 8,935.39 8,939.05 Z-38 6/30/98 PER 12,810. 13,170. 8,967.52 8,943.07 Z-38 6/30/98 PER 12,705. 12,760. 8,973.09 8,969.9 Z-38 6/30/98 PER 14,390. 14,430. 8,976.26 8,977.73 Z-38 7/16/03 MLK 3,660. 3,661. 3,578.58 3,579.42 Z-38 9/22/03 STC 14,346. 14,510. 8,974.28 8,980.51 Z-38 9/11/08 BPS 11,202. 16,940. 8,448.99 8,928.6 Z-38 9/19/09 BPP 11,202. 13,640. 8,448.99 8,946.41 Z-38 1/3/10 APF 11,903. 11,913. 8,973.63 8,977.94 Z-38 1/3/10 APF 11,913. 11,933. 8,977.94 8,985.95 Z-38 1/4/10 APF 11,793. 11,813. 8,914.48 8,926.84 Z-38 1/4/10 APF 11,824. 11,844. 8,933.34 8,944.57 Z-38 1/4/10 APF 11,854. 11,869. 8,949.89 8,957.59 Z-38 1/4/10 APF 11,879. 11,889. 8,962.52 8,967.28 Z-38 7/11/10 APF 12,415. 12,435. 8,995.45 8,994.42 Z-38 7/11/10 BPS 14,175. 14,176. 8,967.44 8,967.47 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • Z-38 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 7/8/2010' CTU 8.1.75", Job Scope: Venturi Basket runs. GR/CCL, Set WRP. Add Perf. Acidize (cont from 7/7/10) RIH w / 3.125" venturi set down at 13162' POOH. At surface venturi basket was packed off. Changeout counter balance valve o- ring on injector. Well control drill. Shut down ops for training. (cont on 7/9/10) / " 7/9/2010 CTU 8.1.75 , Job Scope: Venturi Basket runs, Continue WSR from 7 8/10. RIH w / 3.125" venturi. Still unable to get past 13161' POOH .Wait for WOT to bring out saw tooth mule shoe and fishing motor. RIH with motor and venturi w /burn ' without seeing anything.POOH ~--Job in progress--- shoe made it to 14300 7/10/2010 ~ CTU 8.1.75", Job Scope: Log w / GR CCL /OOH with venturi retrieved some Marge chunks of rock. RIH with a 3.70 drift and PDS GR CCL logging tools to ~ 13160 ft. Multiple attempts to run through 13160 ft while pumping down CT and backside at various rates. POOH and lay down logging tools .RIH with 3.71" 4 bladed junk mill and 3.69" string mill. Drift dry from 13000' to 14300' with motor w s and mill. «<Continue WSR on 7/11/10»>"""Job in progress""* __ _ ~ 7/11/2010 "CTU 8.1.75", Job Scope: Log w / GR CCL & 3.70" Drift. «<Continue WSR ~~ from 7/10/10»>RIH w /PDS GR/CCL logging tools & 3.70 drift. Clean drift to 14300' log up to 11000'. POOH. RIH with WOT 3.69" WRP. Set at 14,175 ft. RIH w / 20 ft 2 7/8" HSD-PJ2906-HMX 20' Interval 6 SPF pert gun. Fire gun top shot ~ p......~. 12415' bottom shot 12435' ...,...~.... ....,..._ w..~ j 7/12/2010 CTU 8.1.75", Job Scope: Acid treatment : OOH w /gun all shots fired recovered ball. Preform injectivity test down coil 1 bpm 1006 psi 1.5 bpm 2200 psi 2 bpm 3600 psi. Pump 2 stage acid job (50 bbls 12% DAD and 50 bbls Mud acid each stage) Perform post acid injectivity test 1 bpm: 1170 psi, 1.5 bpm: 2150 psi, 2 bpm: 3650. POOH, RDMO. Job Complete. 7/12/2010 ~ASRC Test unit #2, flow back acid stimulation to tanks *"job in progress*" ""inlet well Z-38, outlet Z-10"" ` 7/13/2010 ASRC Test unit #2, flowback acid treatment to tanks **job in progress"" *"inlet well Z-38, outlet Z-10*'` 3 7/14/2010 ~ASRC Test unit #2, continue flowback acid stimulation to tanks **job in progress** **inlet well Z-38, outlet Z-10** ~~~ ~ 7/14/2010 T/I/O = 650/1300/180. Temp = SI. Eval cellar for bubbling, sample fluids. (FO~ call in). Bubbling noted from 3 to 6 O'clock position around SH and - 1' from SH ,@ 5 O'clock position. ASRC testers stated cellar has been inflowing fluid, junable to determine source. Observed blue goo that has been pushed out of all flutes and ran slightly down conductor. ASRC testers in control of well upon departure. 7/15/2010 T/I/O = 1150/1300/120. Temp = 120*. Eval bubbling in cellar (Oper call in). AL is online. Intermitant bubbling from 03:00 - 05:00 o'clock positions, 02 @ 20.5%, LEL's @ 0%, H2S @ 0%, CO @ 0%. No bubbling in conductor. Cellar is 38" deep w/ 12" of water (ASRC testers had cellar vacced out @ 08:00 A.M.). ASRC has bled OAP twice in last 24 hrs (280 psi to 0 psi & 320 psi to 0 psi, all fluid). ASRC in control of well. 7/15/2010iASRC Test unit #2, continue flow acid stimulation to tanks *'`job in progress*" "*inlet well Z-38, outlet Z-10*" **conduct PSM/well control drill*" 7/16/2010iT/I/0=450/1180/210. Temp=120°. Eval bubbling in cellar. (Oper call in). AL online. ALP=1200 psi. Bubbling @ 5 o'clock position (- 5 bubbles/min). Fluid m cellar is 6" deep. ASRC in control of well. 7/16/2010~ASRC Test unit #2, flow back acid stimulation to tanks, divert liquids to (production, open inlet choke monitoring for rocks/solids **in progress*" j **inlet well Z-38, outlet Z-10** 7/17/2010 ASRC Test unit #2, complete 6 hour piggy back test, begin rig down, NCCCO crane training **job in progress"" **inlet well Z-38, outlet Z-10** 7/18/2010~T/I/O=SSV/1720/vac. Temp=S1. Monitor bubbling in cellar (oper call in). AL casing valve open, ALP=1720 psi. Observed no bubbling in cellar or in conductor. Fluid in cellar is 11"deep. SV,WV,SSV=C. MV=O. IA,OA=OTG. NOVP. I 7/18/2010sASRC Test unit #2, complete rig down, move out "*job complete** **inlet well Z-38, outlet Z-10*" FLUIDS PUMPED BBLS 431 1 % KCL 553 NH4C1+F103 105 12% DAD ACID 100 9:1 MUD ACID (TITRATION: 8.4% HCL & 1.68% HF 100 DIESEL 1289 Total TREE = 4 a /16" CAMERON W LHEAD = FMC ACTUATOR = BAKER KB. ELEV = 83.7' BF. ELEV = 58.61' KOP = 947' Max Angle = 97 @ 12390' Datum MD = 11748' Datum TV D = 8800' SS Z-38 SA,FETY~'ES: W ELL ANGLE > 70° @ 11975' . DEPTH DISCREPANCY BY RIG TGB TALLY W LEG @ 11235'; SHOULD BE ABOVE LNR PKR TIEBACK SLV @ 11241', BUT NOTE ON TBG TALLY SAYS W LEG IS INSERTED 3-112' INTO TIEBACK. I 9-5/8" CSG, 40#, L-80, ID = 8.835" I Min im u m~"'_,_, _,..__ ID = 3.725" @ 11223' 4-1 /2" HES XN NIPPLE 2175' I-i 4-1 /2" HES SSSV NIP, ID = 3.813" ~ GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 7 3258 3221 24 KBG-2-LS DMY INT 0 09/09/08 6 3653 3573 32 KBG-2-LS** DMY INT 0 01/05/05 5 6983 5602 55 KBG-2-LS DMY INT 0 09/09/08 4 7822 6100 52 KBG-2-LS DMY INT 0 01/05/05 3 9779 7312 37 KBG-2-LS DMY INT 0 01!05/05 2 10624 7986 37 KBG-2-LS DMY INT 0 01/05!05 1 11060 8334 36 KBG-2-LS DMY INT 0 01/05/05 **STA #6 DMY HAS IXTENDm PACKING 11168' -j4-1i2" HES X NIP, ID = 3.813" 11179' 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" 11202' 4-112" HES X NIP, ID = 3.813" I4-1/2" TBG,12.6#, L-80, .0152 bpf, ID= 3.958" ~ 11234' TOP OF TIEBACK SLV 11241' 7" CSG, 26#, L-80, ID = 6.276" 11574' PERFORATION SUMMARY REF LOG: BHCS ON 06/28!98 ANGLE AT TOP PERF: 96 @ 11793' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL OpnlSgz DATE 2-7/8" 6 11793 - 11813 O 01/04/10 2-7/8" 6 11824 - 11844 O 01/04/10 2-718" 6 11854 - 11869 O 01/04/10 2-7/8" 6 11879 - 11889 O 01/04/10 2-7/8" 6 11903 - 11933 O 01!03/10 2-7/8" 6 12415 - 12435 O 07/11/10 2-3/4" 4 12470 - 12620 O 06/30/98 2-314" 4 12705 - 12760 O 06/30/98 2-3/4" 4 12810 - 13170 O 06!30/98 2-3(4" 4 13425 - 13480 O 06/30/98 2-3/4" 4 13550 - 14155 O 06130/98 2-3/4" 4 14190 - 14335 C 06/30/98 2-3/4" 4 14390 - 14430 C 06/30/98 2-3/4" 4 14690 - 14750 C 06!30/98 2-3/4" 4 14800 - 14845 C 06/30/98 2-314" 4 15155 - 15340 C 06/30198 2-3/4" 4 15425 - 15805 C 06130/98 2-3/4" 4 16070 - 16250 C 06/30/98 2-3/4" 4 16340 - 16940 C 06/30/98 4-1 /2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" I-i ,17029' PATE REV BY COMMENTS DATE REV BY COMMENTS 06/30/98 JONES ORIGINAL COMPLETION 10/02/09 DTR/PJC PULL PX PLUG (09/19/09} 07/02/01 CH/KAK CORRECTIONS 02/04/10 RRD/PJC PERFS (01/03-04/10) 09/22/03 SRB/KK SET BKR PACKER 07/13/10 LLVSV SET WRP/ADPERF (07/11/10) 10!29!03 DAVlTLH GLV C,oRRECTION (10/04!03) 01/05/05 LWB/TLP MANDREL TVD CORRECTIONS 09117/08 JRA/TLH PATCH PULLED/PLUG SET/GLVS PRUDHOE BAY UNIT WELL: Z-38 PERMTf No: 1980600 API No: 50-029-22873-00 SEC 19, T11N, R12E, 4309' NSL & 3948' WEL BP Exploration (Alaska) 11223' -'4-112" HES XN NIP, ID = 3.725" I 11235' _ 4-1/2" WLEG, ID = 3.958" 11242' ELMD TT LOGGED 08/14!98 11247' 7" X 4-1 /2" BKR ZXP PKR/TIEBACK SLV 14175' -L69"WFDWRP(07111/10}J 14348' BKR 22FA630 PKR, ID = 2.39" (09/22!08) 1~$' ~ BKR KBH-22 ANCHOR SEAL ASSY, ID = 2.375" 14512' BKR 22FA30 PKR WfTH ENTRY GUIDE, ID = 2.39" PBTD I-i 16955' 14-112" LNR PATCH, 2-7/8" STL TBG, ID = 2.377" STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATIONS ~ ~ ~~ t t t:.} ? U 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate^ r•; u ~ +3;e ~ , ~x S~Q~~I~ -~ - .: Performed: Alter Casing ^ Pull Tubing^ •.. Perforate New Pool ^ Waiver^ Time Extensi , , , Change Approved Program ^ Operat. Shutdown ^ Perforate Q Re nter Suspended W~ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: .Permit to Drill Number: Name: Development Q Exploratory ^ 198-0600 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ API Number: Anchorage, AK 99519-6612 50-029-22873-00-00 8. Property Designation (Lease lumber) : 9. Well Name and Number: \ ADLO-028245 \ ~+ PBU Z-38 10. Field/Pool(s): PRUD HOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: ` Total Depth measured 17029 feet Plugs (measured) None feet true vertical ~ 8917.25 feet Junk (measured) None feet Effective Depth measured 16955 feet Packer (measured) 3626 3665 11179 true vertical 8927 feet (true vertical) 3550 3583 8430 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 91.5# H-40 31 - 111 31 - 111 1490 470 Surface 3072 9-5/8" 40# L-80 30 - 3102 30 - 3077 5750 3090 Intermediate Production 11547 7" 26# L-80 27 - 11574 27 - 8753 7240 5410 Liner 5782 4-1/2" 12.6# L-80 11247 - 17029 8486 - 8917 8430 7500 Liner 164 2-7/8" 6.5# L-80 14348 - 14512 8974 - 8981 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# LL-80 25 - 11235 25 - 8476 2-7/8" 6.5# L-80 3676-3676 3550-3593 Packers and SSSV (type, measured and true vertical depth) 2-7/8" Baker KB Packer 3626 3550 2-7/8" Baker KB Packer 3665 3583 4-1/2" Baker S-3 Hvdro Set Packer 11179 8430 4-1/2" Baker ZXP Packer 11247 8486 2-7/8" 22fab30 akr 14348 8974 2-7l8" 22fab30 pkr 14512 8981 12. Stimulation or cement squeeze summary: ~y ct ~ °~ ~ ~ / ~ Intervals treated (measured): ~, ~~+U"L"'G~~ ~l~`~~ ~ ~Y Treatment descriptions including volumes used and final pressu re: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 0 Subsequent to operation: 0 14. Attachments: .Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ^~ Servic^ Daily Report of Well Operations X .Well Status after work: Oil ~ Gas WDSPL G TOR ^ WAG ^ GINJ ^ WINJ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preb Title Data Management Engineer Signature Phone 564-4944 Date 1/12/2010 ~rE%; 1"~tSUM~ JAN 1 ~ LUIU ~-~'~ ~ //~f./a ~~/ i~~d " Z-38 198-060 DCOC ATTA/'`LJMGAIT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base Z-38 6/30/98 PER 12,470. 12,620. 8,991.91 8,978.93 Z-38 6/30/98 PER 16,340. 16,940. 8,959.99 8,928.6 Z-38 6/30/98 PER 16,070. 16,250. 8,930.5 8,951.65 Z-38 6130198 PER 15,155. 15,340. 8,995.25 . 8,975.46 Z-38 6/30/98 PER 14,800. 14,845. 8,995.88 8,998.38 Z-38 6/30/98 PER 14,690. 14,750. 8,988.02 8,992.25 Z-38 6/30/98 PER 15,425. 15,805. 8,967.69 8,935.96 Z-38 6/30/98 PER 14,190. 14,335. 8,967.9 8,973.68 Z-38 6/30/98 PER 13,550. 14,155. 8,942.88 8,966.74 Z-38 6/30/98 PER 13,425. 13,480. 8,935.39 8,939.05 Z-38 6130/98 PER 14,390. 14,430. 8,976.26 8,977.73 Z-38 6/30/98 PER 12,810. 13,170. 8,967.52 8,943.07 Z-38 6/30/98 PER 12,705. 12,760. 8,973.09 8,969.9 Z-38 7/16/03 MLK 3,660. 3,661. 3,578.58 3,579.42 Z-38 9/22/03 STC 14,346. 14,510. 8,974.28 8,980.51 Z-38 9/11!08 BPS 11,202. 16,940. 8,448.99 8,928.6 Z-38 1/3/10 APF 11,903. 11,913. 8,973.63 8,977.94 Z-38 1/3/10 APF 11,913. 11,933. 8,977.94 8,985.95 Z-38 1/4/10 APF 11,793. 11,813. 8,914.48 8,926.84 Z-38 1/4/10 APF 11,824. 11,844. 8,933.34 8,944.57 Z-38 1/4/10 APF 11,854. 11,869. 8,949.89 8,957.59 Z-38 1/4/10 APF 11,879. 11,889. 8,962.52 8,967.28 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • C~ Z-38 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 1/3/2010j"*"ARRIVAL =WELL SHUT-IN""* (E-LINE: ADPERF 95') INITIAL T/IA/OA: 500/280/180 PSI. BALL RUNS ARE TIED INTO GR/CCL JEWELRY LOG DATED 1-JAN-2010. ;ALL GUNS ARE 2-7/8" POWER JET HSD LOADED WITH 2906 HMX .CHARGES 6 SPF / 60 DEG PHASING. f RUN 1: TOOL STRING: 28'x2.875" PERFORATED INTERVAL FROM 11913' [ TO 11933'. ;RUN 2: T STRING: 24'x2.875" PERFORATED INTERVAL FROM 11903' j RUN 3: TOOL STRING: 24'x2.875", RIH TO 12030' AND BEGIN CORRELATING. *'"*JOB IN PROGRESS AND CONTINUED ON 4-JAN-2010 WSR**" __s~_.. _ .___ ~...._.._ e. ~. _ ._. m._ ~_,.__. _~_~. ____._~_ 1/4/2010';""*JOB CONTINUED FROM 3-JAN-2010""* (E-LINE: ADPERF 95') [ALL RUNS ARE TIED INTO GR/CCL JEWELRY LOG DATED 1-JAN-2010. `ALL GUNS ARE 2-7/8" POWER JET HSD LOADED WITH 2906 HMX CCHARGES 6 SPF / 60 DEG PHASING. ;RUN 3: TOOL STRING: 24'x2.875". PERFORATED INTERVAL FROM 11879' `T0 11889'. RUN 4: TOOL STRING: 28'x2.875". PERFORATED INTERVAL FROM 11854' `TO 11869' RUN 5: TOOL STRING: 28'x2.875", PERFORATED INTERVAL FROM 11824' TO 11.844' ,RUN 6: TOOL STRING: 28'X2.875", PERFORATED INTERVAL FROM 11793' TO 11813, j DID NOT PERFORATE 12415' TO 12435' DUE TO DEVIATION > 90 DEG. 'POOH TO SURFACE AND BEGIN RIGGING DOWN. "**JOB IN PROGRESS AND CONTINUED ON 5-JAN-2009 WSR*** 1/5/2010 *"*JOB CONTINUED ON 5-JAN-2009***(E-LINE RIGGING DOWN). .RIG DOWN E-LINE UNIT. PAD OPERATOR NOTIFIED OF FINAL VALVE POSITIONS: MASTER:O, WING:C, SSV:C, GL:C, CHEM-INJ:C, SWAB:C, IA/OA:OTG FINAL T/IA/OA: 450/280/160. WELL LEFT SHUT-IN ***JOB COMPLETE*** FLUIDS PUMPED BBLS 2 METH 1 diesel 3 Total TREE= 4-1/16" CAMERON - - WELLHEAD= --- FMC 'ACTUATOR= BAKER KB. ELEV = 83.T I BF. ELEV = 58.61' ', KOP = 94T 'Max Angle = 97 @ 12390' ,Datum MD = 11748' Datum TV D = 8800' SS Z-38 ~' SAFEt~TES: WELL ANGLE> 70° @ 11975' . DEPTH DISCREPANCY BY RIG TGB TALLY W LEG @ 11235'; SHOULD BE ABOVE LNR PKR TIEBACK SLV @ 11241', BUT NOTE ON TBG TALLY SAYS WLEG IS INSERTED 3-112' INTO TIEBACK. 9-5/8" CSG, 40#, L-80, ID = 8.835" I-I 3102" Minimum ID = 3.725" @ 11223' 4-1/2'" HES XN NIPPLE 7 3258 3221 24 KBG-2-LS DMY INT 0 09/09/08 6 3653 3573 32 KBG-2-LS'* DMY INT 0 01!05/05 5 6983 5602 55 KBG-2-LS DMY INT 0 09/09/08 4 7822 6100 52 KBG-2-LS DMY INT 0 01/05/05 3 9779 7312 37 KBG-2-LS DMY INT 0 01/05(05 2 10624 7986 37 KBG-2-LS DMY INT 0 01/05/05 1 11060 8334 36 KBG-2-LS DMY INT 0 01/05/05 **STA #6 DMY FiAS IXTENDED PACKING 11168` -'4-112" HES X NIP, ID = 3.$13" „_,,,,,_,,,,.,,,,.,,., 11179" 7" X 4-112" BKR S-3 PKR, ID = 3.875" 11202' 4-112" HES X NIP, ID = 3.813 11223" 4-1/2" HES XN NIP, ID = 3.725 4-1/2" TBG,12.6#, L-$0,..0152 bpf, ID = 3.958" 11234" 11235" 4-112" WLEG, ID = 3.958" TOP OF TIEBACK SLV 11241' 11242' ELMD TT LOGGED 08/14/98 11247' 7" X 4-1/2" BKR ZXP PKRiTIEBACK SLV 7" CSG, 26#, L-80, ID = 6.276" I-I 11574' PERFORATION SUMMARY REF LOG: BRCS ON 06!28/98 ANGLE AT TOP PERF: 96 @ 12470' Nate: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-314" 4 12470 - 12620 O 06/30/98 2-3/4" 4 12705 - 12760 O 06!3019$ 2-314" 4 12810 - 13170 O 06/30/98 2-3(4" 4 13425 - 13480 O 06/30/98 2-3/4" 4 13550 - 14155 O 06/30198 2-3/4" 4 14190 - 14335 O 06130/98 2-3/4" 4 14390 - 14430 O 06130/98 2-314" 4 14690 - 14750 O 06/30/98 2-3/4" 4 14800 - 14845 O 06!30!98 2-3/4" 4 15155 - 15340 O 06/30!98 2-314" 4 15425 - 15805 O 06/30/98 2-3/4" 4 16070 - 16250 O 06/30/98 2-314" 4 16340 - 16940 O 06/30/98 4-112" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" I-I 17029' DATE REV BY COMMENTS DATE REV BY COMMENTS 06130198 JONES ORIGINAL COMPLETION 10/02/09 DTR/PJC PULL PX PLUG (09!19/09) 07/02/01 CH/KAK CORRECTIONS 09/22/03 SRB/KK SET BKR PACKER 10/29/03 DAVITLH GLV CORRECTION (10/04/03} 01105/05 LWBITLP MANDREL TVD CORRECTIONS 09117/08 JRA/TLH PATCH PULLED/PLUG SETIGLVS PRUDHOE BAY UNIT WELL: Z-38 PERMIT No: 1980600 API No: 50-029-22873-00 SEC 19, T11 N, R12E, 4309' NSL & 3948' WEL BP Explaratian (Alaska} 2175' -~4-112" HES SSSV NIP, ID = 3.813" GAS LIFT MANDRELS ¢$~--i BKR 22FA 630 PKR, ID = 2.39" (09/22/08} 1450$' BKR KBH-22 ANCHOR SEAL ASSY, ID = 2.375" 14512' ~ BKR 22FA30 PKR WITH ENTRY GUIDE, ID = 2.39" PBTD I-i 16955' 4-1/2" LNR PATCH, 2-7/8" STL TBG, ID = 2.377" ~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 ~§ } + ~i ~ J August 14, 2009 ~~ ~ ~ ~ ~ ` ~~~` ' ~~~ ~ i'~~i.3a~ L~~~ Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7ih Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB Z-Pad Dear Mr. Maunder, ~ bp ~~~~~ Y ~~ OCT a 5 20Q9 ~I~s~C~ Dil ~ Gas Cons. Ca~xrNR~iAn Anchorape ~°~~- ~6a ~.. - 3 ~ Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Z- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. !f you require any additionai information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator i ~ BP Expioration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Date Z-Pad 8/13/2009 Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al Z-01 B 2081080 50029218300200 NA 0.2 NA 3.40 7/24/2009 Z-02A 1960430 50029218140100 NA 0.4 NA 3.40 7/24/2009 Z-03 1971310 50029227870000 NA 1.3 NA 11.90 7/24/2009 Z-04A 2042300 50029219900100 NA 1.5 NA 14.50 7/24/2009 Z-05 1900780 50029220560000 NA 1 NA 8.50 7/24/2009 Z-O6 1880320 50029217980000 NA 0.1 NA 1.70 7/24/2009 Z-07A 1931100 50029220460100 NA 2 NA 17.00 7/24/2009 Z-OSA 1931280 50029217870100 NA 0.2 NA 2.55 7/24/2009 Z-O9A 2081410 50029219670100 NA 02 NA 1.70 7/24/2009 Z-10 1891160 50029219860000 NA 1.3 NA 11.10 7/24/2009 Z-11A 2050310 50029220530t00 NA 0.2 NA 1.70 7/26/2009 Z-12 1891020 50029219770000 NA 1.2 NA 8.50 7/26/2009 Z-13A 2042030 50029220690100 NA 3.6 NA 24.66 7/26/2009 Z-14B 2060990 50029218440200 NA 0.2 NA t.70 7/26/2009 Z-15 1880880 50029218490000 NA 0.2 NA 1.70 7/26/2009 Z-16 1920120 50029222450000 NA 0.3 NA 2.55 7/26/2009 Z-17 1891390 50029220010000 NA 3.7 NA 34.00 7/26/2009 Z-18 1890960 50029219710000 NA 0.2 NA 1.70 7/26/2009 Z-19A 2061050 50029222510100 NA 0.2 NA 1.70 7/26/2009 Z-20 1881000 50029218590000 NA 0.2 NA 1.70 7/26/2009 Z-21A 2001010 50029219380100 NA 0.2 NA 1.70 7/23/2009 Z-226 1960350 50029220370200 NA 0.5 NA 5.10 7/23/2009 Z-238 2041080 50029219500200 NA 0.3 NA 1.70 7/23/2009 Z-24 1890180 50029219170000 NA 0.3 NA 2.55 7/23/2009 Z-25 1881590 50029219020000 NA 0.2 NA 1.70 7/23/2009 Z-26A 2060790 50029219450100 NA 0.3 NA 3.40 7/23/2009 Z-27 1900310 50029220220000 NA 02 NA 2.55 7/25/2009 Z-28 1881270 50029218790000 NA 0.2 NA 1.70 7/25/2009 Z-29 1890650 50029219540000 NA 0.2 NA 1.70 7/25/2009 Z-30A 2032190 50029220130100 NA 0.2 NA 3.40 7/25/2009 Z-31 1881120 50029218710000 NA 0.3 NA 3.40 7/26/2009 Z-32BL1 1970350 50029219246000 NA 0.2 NA 1.70 7/25/2009 Z-33A 1890050 50029218950100 NA 0.5 NA 3.40 8/8/2009 Z-35 1980930 50029228840000 NA 1.3 NA 11.50 7/4/2009 Z-38 1980600 50029228730000 NA 1.2 NA 11.90 7/26/2009 Z-39A 2042240 50029229950100 NA 3.8 NA 39.90 7/25/2009 Z-46A 2052030 50029232800100 NA 1.7 NA 13.60 7/26/2009 Z-100 2031710 50029231820000 NA 5 NA 45.90 7/23/2009 Z-101 2001620 50029229780000 NA 1 NA 10.20 7/23/2009 Z-102 2070500 50029233530000 NA 1.5 NA 15.30 7l25/2009 Z-103 2042290 50029232350000 NA 1.5 NA 10.20 7/25/2009 Z-108 2052010 50029232920000 NA t.5 NA 11.90 7/24/2009 Z-112 2071720 50029233800000 NA surface NA Scblumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503·2838 ATTN: Beth 1 ZOOl NO. 4290 Commi$5iQ![! Company: State of Alaska Alaska Oil & Gas Cons Comm AUn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Well Job# Loa DescriDtion Date BL Color CD L5-23 11733320 PRODUCTION PROFILE 04/30/07 1 W-38A 11660532 MEM PROD PROFILE 05/02/07 1 Z-38 11660534 MEM PROD PROFILE 05/05/07 1 17-22 11745213 LDL 04/29/07 1 W-19A 11628772 MEM PROD PROFILE 05/07/07 1 Y-24 11630477 LDL 05/08/07 1 16-0BA 11686747 LDL OS/20/07 1 G-05 11773110 LDL 05/13/07 1 16-03 11686743 LDL 05/11/07 1 14-07 11637334 PRODUCTION PROFILE 05/08/07 1 V-03 11628770 MEM LDL 04/30/07 1 MPF-91 11628759 MEM TEMP SURVEY 03/09/07 1 MPF-89 11628758 MEM TEMP SURVEY 03/08/07 1 MPS-10A 11638630 INJECTION PROFILE 05/07/07 1 B-34 11594500 INJECTION PROFILE OS/22/07 1 04-10 11594498 LDL 05/19/07 1 B-07 11657125 PRODUCTION PROFILE 05/11/07 1 H-24 11745216 PPROF/GLS 05/02/07 1 04-24 11773112 PRODUCTION LOG 05/19/07 1 C-28A N/A LDL 05/09/07 1 M-07 11630476 LDL 05/07/07 1 P1-14 11745214 INJECTION PROFILE 04/30/07 1 P1-16 11594494 INJECTION PROFILE 05/01/07 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:. ., n 1 2.007 BP Exploration (Alaska) Inc.c;:,,,....A""t...\i=n JUN f,J Petrotechnical Data Center LR2-1 1i.ìI\,IV"U~ 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambe" Street, Suite 400 Anchorage. AK 99503-2838 ATTN: Beth ~ Received by: ~ --- Date Delivered: I CJt" - OcP Ò 'óß-J 06/07/07 . . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS ..'~ - -: "" 1. Operations Performed: Abandon 0 Alter Casing D Change Approved Program D 2. Operator --., ?-, SuspendD Repair WellŒ Pull TubingD Operation ShutdownD Plug PerforationsD Perforate New Pool D 4. Current Well Class: Perforate 0 WaiverD Stimulate D Time ExtensionD Re-enter Suspended Well 0 5. Permit to Drill Number: 198-0600 Name: BP Exploration (Alaska), Inc. Development Œ] StratigraphicD 9. Well Name and Number: Z-38 10. Field/Pool(s): Prudhoe Bay Field 1 Prudhoe Oil Pool 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): ExploratoryD ServiceD 84.20 8. Property Designation: ADL-0028245 11. Present Well Condition Summary: Total Depth measured 17029 feet true vertical 8917.3 feet Effective Depth measured 16955 feet true vertical 8926.8 feet Casing Conductor Liner Liner Production Surface Perforation depth: Measured depth: 12470 -12620,12705 -12760,12810 -13170,13425 -13480,13550 -14155,14190 -14335 14690 -14750,14800 -14845,15155 -15340,15425 - 15805, 16070 -16250,16340 -16940 True vertical depth: 8991.91 - 8978.93,8973.09 - 8969.9,8967.52 - 8943.07,8935.39 - 8939.05,8942.88 - 8966.74,8967.9 - 8973.68 8988.02 - 8992.25, 8995.88 - 8998.38, 8995.25 - 8975.46, 8967.69 - 8935.96, 8930.5 - 8951.65, 8959.99 - 8928.6 Tubing (size, grade, and measured depth): 4-1/2" 12.6# L-80 @ 25 11235 2-7/8" 6.5# L-80 @ 3626 3676 Packers & SSSV (type & measured depth): 2-7/8" 22FAB30 Packer @ 14348 2-7/8" 22FAB30 Packer @ 14512 2-7/8" Baker KB Packer @ 3626 2-7/8" Baker KB Packer @ 3665 4-1/2" Baker 5-3 Hydro Set Packer @ 11179 4-112"BakerZXPPacker @ 11247 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Representative Dailv Averaae Production or Injection Data Ga~MCf I W::~-:bl Casing ~ressure Length 80 5782 . 164 11547 3072 13 Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys run - Plugs (measured) Junk (measured) Size 20" 91.5# H-40 4-1/2" 12.6# L-80 2-7/8" 6.5# L-80 7" 26# L-80 9-5/8" 40# L-80 MD TVD 31 111 31.0 - 111.0 11247 - 17029 8485.6 - 8917.3 14348 - 14512 8974.4 - 8980.6 27 - 11574 27.0 - 8752.6 30 - 3102 30.0 - 3076.5 8FL ØI)MS Oil-Bbl 428 Well Shut-In 15. Well Class after proposed work: ExploratoryO OtherD 6. API Number 50-029-22873-00-00 None None Burst 1490 8430 10570 7240 5750 Collapse 470 7500 11160 5410 3090 RECEIVED MAH 3 0 2004 AI.. Oil & Gas 1'....- Cnm-:--. Anrbs;; ~v"qlllllion MAR S 1- 200~ 0 Tubing Pressure 778 0 DevelopmentŒ ServiceD Daily Report of Well Operations. ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garry Catron Printed Name Garry Catron Jj~ r~~ Form 10-404 Revised 12/2003 16. Well Status after proposed work: Operational Shutdown 0 OilŒ) GasD WAG 0 GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. SUndry Number or NIA if C.O. Exempt: . N/A Title prod~9.1~Ñ~niC~I~sistant .,-, '.., ¡ ('. ( , ~hope i 564-~W" Ð . U -'o~gO4 Signature . . 3/26/04 ~ 7"" ...,) . > ~ ~ ~ .. . Z-38 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 02/02/04 ATTEMPTED TO SET BAKER LOWER PATCH OD 3.70" X 25', UNABLE TO GET 13' BELOW SWAB VALVE, DRIFTED TO 3750' WITH 3.80" SWEDGE WITH NO PROBLEMS. WELL SHUT IN 02110/04 SET LOWER 4.5" KB BAKER PACKER WITH TIE BACK SLEEVE MID ELEMENT @3665', TOP OF TIE BACK SLEEVE @3658', BOTTOM OF ASSEMBLY AT 3681.5', 2-7/8" X-NIP AT 3676', MAX OD=3.7", OAL=23.62', MIN ID= 2.31" (X-NIP), FISH NECK IS 4" GS. WILL RETURN TO SET UPPER PACKER. ***SHUT IN*** 03/03/04 T/I/0=SINAC/360. MONITOR WHP'S. (PRE E-LlNE). ARCTIC PAC IN OA. E-LiNE WILL BE ABLE TO RIG-UP ON THE WELL RUNNING WIRE THROUGH THE MAN DOOR, RIG CAMP IN FRONT OF THE WELL PREVENTS NORMAL RIG-UP. NO SNOW REMOVAL NEEDED. 03/04/04 THE UPPER SECTION OF A 4.5" BAKER PATCH WAS SET @ 3626'. UPPER PKR IS 45 KB WITH 4 1/2" "G" FISH NECK, 30K TO RELEASEUPPER SECTION WAS LANDED INTO LOWER SECTION SET ON 10-FEB-2004. MIN.ID IS 2.31 "X" NIPPLE BELOW LOWER PACKER. WELL LEFT SHUT IN. FLUIDS PUMPED BBLS No Fluids Pumped 0 ITOT AL SCANNED MAY 0 1 2004 Page 1 -I ..... "" - '" .~ .... . TREE= 4-1/16" CAMERON We.LHEAD = FMC ACTUA. TOR = BAKER KB. ELEV = 83.7' BF. ELEV = 58.61' 'KOP = 947' Max Angle = . 97 @ 12390' OatumMO= 11748' DatumTVD = 8800' 55 I 9-518" C5G, 40#, L-80, ID = 8.835" H 3102' Minimum ID = 2.31" @ 3676' HES X NIPPLE IN TAILPIPE OF PATCH 14-1/2" TBG,12.6#, L-80, .0152 bpf, ID= 3.958" H 11234' I TOPOFTEBACKSLV H 11241' 7" CSG, 26#, L-80, 10= 6.276" H 11574' PERFORA llON SLMfv\ð.RY Rff LOG: BHCS ON 06128/98 ANGLE AT TOP PERF: 96 @ 12470' Note: Refer to Production œ for historical perf data SIZE SPF INTffiVAL Opn/Sqz DATE 2-3/4" 4 12470 - 12620 0 06/30/98 2-3/4" 4 12705 - 12760 0 06/30/98 2-3/4" 4 12810-13170 0 06/30/98 2-3/4" 4 13425-13480 0 06/30/98 2-3/4" 4 13550-14155 0 06/30/98 2-3/4" 4 14190 - 14335 0 06/30/98 2-3/4" 4 14390 - 14430 0 06/30/98 2-3/4" 4 14690 - 14750 0 06/30/98 2-3/4" 4 14800 - 14845 0 06/30/98 2-3/4" 4 15155-15340 0 06/30/98 2-3/4" 4 15425 - 15805 0 06/30/98 2-3/4" 4 16070-16250 0 06/30/98 2-3/4" 4 16340 - 16940 0 06/30/98 D6.TE 06/30/98 07 ,Q2KJ1 07,Q6,Q3 07/19,Q3 08/17,Q3 09J22,Q3 REV BY COWM8'lTS JONES ORIGINAL COMPLEfION CH'KAK CORRECTONS OlRlKK GLVClO JBMlKK GLVClO JAF/KK SET BKR 22FA30 PKR SRB/KK SET BKR 22FAB30 A<R /"""'\ Z-38 SAÆTY NOTES: WELL EXCæDS 700 @ 11975' & GOESHORIZ@ 12102', DEPTH DISCREPANCY BY RlGTGB TALLYWLEG@ 11235'; SHOULD BE ABOVELNRPKRl1EBACKSLV@ 11241', BUT NOTE ON TBG TALLY SAYS WLEG IS INSERTED 3- 1/2'INTO TlæACK. ..Jt~ 2175' H4-1/2"HESSSSVNIP,10=3.813" I ~ ~t 3626'-3665' HBKRKB PATCHw IHES 2-7/8" X I\IP, ID =2.31" I ~.~ 3676' HHES2-7/8"XNIPINPATŒlTAILPlFE,ID=2.31" I GAS LFT fv\ð.t-ÐRELS I I ST tv[) lVO DBI TYFE VLV LATCH RJRT DAlE 7 3258 3137 25 KBG-2-LS DMY INT 0 04/21/99 6 3653 3488 32 KBG-2-LS** DMY INT 07119/03 5 6983 5518 55 KBG-2-LS DMY INT 0 07/06103 L - 4 7822 6015 52 KBG-2-LS DMY INT 0 04/21/99 - 3 9779 7227 36 KBG-2-LS DMY INT 0 04/21/99 2 10624 7902 37 KBG-2-LS DMY INT 0 04/21/99 1 11060 8249 35 KBG-2-LS DMY INT 0 04/21/99 **51 A #6 DMY HAS EXTEIÐED PACI<ING l11168' H4-1/2" HESXNIP, ID=3.813" \ I 11179' U7"X4-1J2" BKRS-3PKR, D=3.875" \ I 11202' H4-1/2"HESXNIP, 10=3.813" \ I 1 I 8: Z" I I r-1 11223' 11235' 11242' 11247' H4-1/2"HESXNI\IP,10=3.725" I ...J4-1/2" WLEG, ID= 3.958" I H ELMDTT LOGGED 08/14/98 H7" X 4-112" BKRZXP PKR/TIEBAO< SLV I ~ I \ ) &. ... 0 I 14348' H BKR 22FAB3O A<R, ID = 2.39" I 14508' HBKRKBH-22' ANŒlORSEALASSY,ID= 2.375' 14512' HBKR22FA30 A<R I w/ ENlRY GUDE,ID = 2.39" 16955' \ 14-1/2" LNRPATŒI, 2-7/8" STL TBG,ID= 2.377" \4-1/2"Li'R,12,6#,L-80,.0152bpf,10=3.958" H 17029' \ DA 1E REV BY COMM::NTS 10/29/03 DAVITLH GLV OORRECTION (10,Q4/03) 02110/04 MJAA<K SET' DEPLOY SLY; TOP PATCH 03/24/04 MJAITLH SET' PA Ta-! (03,Q3/04) PRLDI-DEBAY LNIT WELL: Z-38 PERMIT I\b: 1980600 AR I\b: 50-029-22873-00 SEC 19, T11N, R12E, 4309' NSL & 3948' we. BPExploration (Alaska) SCANNED MAY 0 1 2004 REPORT OF SUNDRY WELL OPERATIONS 1. Operations Pedormed: Abanon[~] Suspendr~ Operation Shutdownr-~ Perforater'~ variancer"] Annuar Disposal['"~ After Casinqr-~ Repair Well, Plu.(] Perforationsr'~ Stimulate[--] Time Extensionr-~ OtherF-] Change Approved Programr~ Pull TubingD Perforate New Pool[~ Re-enter Suspended Well['-] LINER PATCH 2. Operator 4. Current Well Class: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc. Development · Exploratory[-'] 198-060 3. Address: P.O. Box 196612 6. APl Number Anchorage, Ak 99519-6612 Stratigraphic [-1 servicer~ 50-029-22873-00-00 7. KB Elevation (ft): 9. Well Name and Number: 84.00 Z-38 8. Property Designation: 10. Field/Pool(s): ADL 028245 Prudhoe Bay Field / Prudhoe Bay Oil Pool 11. Present Well Condition Summary: Total Depth measured 17029 feet true vertical 8917 feet Plugs (measured) Patch from 14346'-14510' (09/22/2003). Effective Depth measured 16955 feet Junk (measured) true vertical 8927 feet Casing Length Size MD TVD Burst Collapse Conductor 110' 20" 140' 140' 40K 520 Surface 3072' 9-5/8" 3102' 3076' 80K 6280 intermediate 11544' 7" 11574' 8752' 80K 7020 Liner 5782' 4-1/2" 11247'-17029' 8485'-8917' 80K Perforation depth: Measured depth: Open Perfs 12470-620, 12705-760, 12810-13170, 13425-480, 13550-14155, Open Perfs 14190-335, 14690-750, 14800-845, 15155-340, 15425-805, Open Perfs 16070-250, 16340-940. Perfs Mechanically Isolated 14390-430. True vertical depth: Open Perfs 8992-8979, 8973-8970, 8968-8943, 8935-8939, 8943-8967, Open Perfs 8968-8974, 8980-8992, 8996-8998, 8995-8976, 8968-8936, Open Perfs 8931-8952, 8960-8929. Perfs Mechanically Isolated 8976-8978. Tubing: ( size, grade, and measured depth) 4-1/2" 12.6# L-80 TBG to 11179' with 4-1/2" Tailpipe to 11235'. Packers & SSSV (type & measured depth) 7"x4-1/2" BKR S-3 PKR @ 11179'. 7"x4-1/2" BKR ZXP PKR/'T'I'EBK"S,L-V, @ ~1~.1 ;247'. 4-1/2" HES SSSV Nipple @ 2175'. 12. Stimulation or cement squeeze summary: ,~ .... ~, ....,: .... Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: SHUT-IN Subsequent to operation: SHUT-IN 14. Attachments: 15. Well Class after proposed work: Exploratory[--~ Development~ Service[--] Copies of Logs and Surveys run _ 16. Well Status after proposed work: Oil· Gasr"l WAGI-'I GINJFI WlNJFI WDSPLr-I Daily Report of Well Operations __X 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ISundry Number or N/A if C.O. Exempt: Contact DeWayne R. Schnorr I N/A Printed Name DeWayne R. Schnorr Title Techical Assistant Signature ,~,~z~.~_., ,~, ~~_~ Phone 907/564-5174 Date Sept23,2003 Form 10-404 Revised 2/2003 ORIGINAL 07/23/2003 07/24/2003 07/25/2O03 08/18/2003 08/19/2003 09/20/2003 09/21/2003 09/22/20O3 Z-38 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS PATCH TUBING PATCH TUBING PATCH TUBING PATCH TUBING PATCH TUBING PATCH TUBING PATCH TUBING PATCH TUBING / LINER: / LINER: / LINER: / LINER: / LINER: / LINER: / LINER: / LINER: DRIFT/TAG DRIFT/TAG DRIFT/TAG; MILL DRIFT/TAG; MILL DRIFT/TAG; MILL DRIFT/TAG; MILL DRIFT/TAG; MILL DRIFT/TAG; MILL O7/23/O3 O7/24/O3 O7/25/O3 EVENT SUMMARY CTU #5 - RU AND COMPLETE FULL BOP TEST. KILL WELL WITH 6 BBLS METHANOL FOLLOWED BY 220 BBLS 1% KCL SLICK FILTERED WATER WHILE RIH WITH 3-1/8" VENTURI WITH 12 FT BARREL, STARTED HOVERING AT 11M200'. WORKED DOWN TO 14550' CTMD GETTING FREQUENT PICKUP'S. SAT DOWN ONCE AT 13,647' BUT WENT RIGHT PAST AFTER PICKING UP. UP WEIGHT -26K AND PULLED SMOOTHLY. POOH. CTU #5. VENTURI BASKET/D&T. RECOVERED TWO CUPS OF ROCKS/SCALE/METAL. ALL OF IT VERY HEAVY MATERIAL. RERUN MHA#1, START VENTRI @ 11200', SETTING DOWN AT 14480', WORKED TO 14550', POOH. RECOVERED LARGE CEMENT CHUNKS, ROCKS, AND SAND (MAX DIMENSION 5"X2.25"X1"). TOTAL RECOVERY FOR THIS RUN 1 QUART. RERUN MHA#1. BULLHEAD 30 BBLS 1% KCL SLICK WATER DOWN TUBING AND START VENTURI FROM 13810' TO 14580' CTMD. PUH TO 11200'. RBIH AT MINIMUM RATE TO 14580' CTMD. POOH PUMPING 0.6 BPM. RECOVERED SMALL FIST SIZED CMT CHUNK. RIH WITH 3.70"X5.25' DRIFT & 3.50" NOZZLE. OVERALL LENGTH = 18.63'. CTU #5 RIH W/3.70" x 5.25' DRIFT & 3.5" DJN. SAT DOWN @ 14,458' CTMD, (SUSPECT LINER DAMAGE AT 14,440' ELMD). ATTEMPTED TO WASH PAST AT MAXIMUM PUMP RATES. POOH. RIH WITH WFD 3.70" STRING & 3.70" TAPERED BULLNOSE MILL. RIH TO XN AND TAG @ 11,244' CTD, START MOTOR AND FALL THROUGH WITH MINIMAL MOTOR WORK, RIH TO TAG @ 14,450'. PBUH WHILE BACK REAMING TO 14200' CMTD. TIGHT SPOTS @ 14353', 14383', 14400', 14405' RIH TO DEEPEST DEPTH OF 14591' CTMD. MULTIPLE TRIPS FROM 14300'-14590', NO SIGNIFICANT MOTOR WORK. DRY RUNS TO 14591' CTD SET WEIGHT AT VARIOUS DEPTHS BUT ABLE TO CONTINUE TO 14590' CTD, POOH. LITTLE TO NO WEAR ON MILL. MU AND RIH WITH 3.70"X5.25' DRIFT & 3.5" DJN, SAW SMALL BOBBLE @ 14467', CONTINUED TO FINAL DRIFT DEPTH OF 14590'. FREEZE PROTECT WITH 50/50 METHANOL TO 2500'. JOB COMPLETED. <<< WELL LIFT SHUT-IN >>> Page 1 08/18/03 08/19/O3 O9/2O/O3 09/21/03 09/22/03 Z-38 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS LINER PATCH. MIRU DS CTU #9. PERFORM WEEKLY BOP TEST. MU BAKER 2-1/4" COIL CONNECTOR. LINER PATCH. MU AND RIH WITH PDS MEMORY GR/CCL IN 2.4" CARRIER AND 3.68" X 5.91' LONG DRIFT. RIH TO 14,600' CTMD. LOGGED BR/CCL UP 14,100'. FLAGGED PIPE @ 14500' CTMD. POOH. LOG DATA IS GOOD (-10 FT CORRECTION). RIH WITH BAKER 22FA30 RETAINER PRODUCTION PACKER WITH ENTRY GUIDE BOTTOM. CORRECTED TO CENTER OF ELEMENT AT FLAG. SET PACKER @ 14510'. POOH. DID NOT DISTURB FREEZE PROTECT. LEAVE WELL SHUT-IN. NOTIFY PAD OPERATOR. BLOW REEL DOWN WITH N2 FOR PIPE SWAP. 737,000 RUNNING FT ON REEL. RDMO. <<< JOB COMPLETE >>> LINER PATCH. MIRU DS CTU #9. MATE CTU WITH WWP. PERFORM BOP TEST - PASSED. RIH WITH PDS MEMORY CCL/GR IN CARRIER. LOG FROM 14450' TO 14100' CTM. FLAG PIPE @ 14250' CTM. BEGIN KILLING WELL WITH 9 PPG SLICK BRINE. LINER PATCH / CTU #9. FINISHED WELL KILL WITH 9 PPG SLICK BRINE AND LAY IN 45 BBLS OF FLOPRO (3% LUBTEX) FROM 14450' TO 11550'. POOH. MONITOR HOLE, LOSSES AT 12 BBLS/HOUR. MU AND RIH WITH 4-1/2" LINER PATCH ASSY. SET DOWN EARLY AT 14430' CORRECTED. PUH WITH SLIGHT OVERPULL. SET DOWN SAME, ELECT TO POOH. APPEARS 3.70" PBR ASSEMBLY WILL NOT PASS THROUGH BAD SPOT IN LINER. BREAK OUT LINER PATCH ASSY. PBR SHOWED EXTENSIVE VERTICAL SCARRING. MU AND RIH WITH 4-1/2" LINER PATCH ASSY, LESS PBR. LINER PATCH / CTU #9. RIH WITH 4-1/2" LINER PATCH ASSY. SET DOWN HIGH AT 14430' (7K). POPPED THROUGH AND CONTINUED RIH. LATCHED INTO LOWER PACKER @ 14501'. PULLED 10K OVER TO CONFIRM LATCH. SLACKED OFF WEIGHT. LAUNCH 1/2" ALUM BALL AND SET UPPER 4-1/2" BAKER FAB-1 PACKER. TOP ELEMENT OF OF PATCH @ 14346', BOTTOM ELEMENT @ 14510'. POOH. RECOVERED BAKER SETTING TOOL AND 1/2" BALL. RIH WITH 2.25" JSN TO 15400' CTMD (MAXIMUM COIL). PUH JETTING LINER TAKING RETURNS. CLEANED OUT TO BOTTOM OF PATCH AND LOST RETURNS. MOMENTARILY DETAINED. BULLHEADED INTO WELL. PULLED NOZZLE ABOVE PATCH AND RESUMED CIRCULATING WITH PARTIAL RETURNS. ELECT NOT TO RBIH THROUGH PATCH. BULLHEAD 40 BBLS BLEACH TO PERFS BELOW PATCH. OPEN CHOKE AND RESUMED CIRCULATING. LAY IN BLEACH ACROSS PERFS ABOVE PATCH. POOH CIRCULATING 1% KCL WATER, PARTIAL RETURNS (EST. 50%). FP IA AND TUBING TO 2500' WITH 60/40 METHANOL. RD DS CTU #9. <<< JOB COMPLETED >>> Page 2 Z-38 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS FLUIDS PUMPED BBLS DIESEL 9 50/50 METHANOL WATER 388 60/40 METHANOL WATER 1465 1% KCL SLICK WATER 61 1% KCL EXTRA SLICK WATER 300 8.9 PPG BRINE 719 9.0 PPG SLICK BRINE 45 FLOPRO WITH 3% LUBTEX 79 LITHIUM HYROCHLORITE 9 380 GAL N2 3O75 ,TOTAL Page 3 07/22/O3 Schlumberger NO. 2946 Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Endicott Well Job # Log Description Date Blueline Color Prints CD Z-39 c,,~-~' PROD LOG W/DEFT 07/19/03 D.S. 2-14 ---~c,_~) ~.,~ \ ~ RST GRAVEL PACK 07117103 Z--3~- \ (~ ~<~ "(~ ~2 ~ LDL 07116103 N-lIB '~Q~ - ~ SBHP SURVEY 07/16103 D.S. 15-08B ~ q ~- ~ ~ RST G~VEL PACK 07/14103 D-03A ~~ I, ~ ~ MEM PROD PROFILE 061~9/03 K-317B ~[ ~T~'( ~ PROD PROFILE W/DEFT 06109103 D.S. 5-04A ~ ~0%~ MEM PROD PROFILE 06114103 D-13A ~~( MEM PROD PROFILE 06123103 DSS.02n~- ~ ' ' ' ~ ~ ~ / ~ MEM PROD PROFILE 06/~0/03 .. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A'I-I-N: Beth ,~, RbL;biVbL) STATE OF ALASKA " ALASKA OIL AND GAS CONSERVATION COMMISSION JUN REPORT OF SUNDRY WELL OPERATIONSAi=k oil & Gas Cons. Commissi0r~ 1. Operations performed: Production Log Operation shutdown_ Stimulate _ Plugging _ Pedorate ~nohor~ Pull tubing _ Alter casing _ Repair well _ Other _X 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 970' FNL, 1007' FWL, Sec. 19, T11N, R12E, UM At top of productive interval 606' FSL, 73' FEL, Sec. 14, T11N, R11E, UM At effective depth 1477' FNL, 1291' FWL, Sec. 14, T11N, R11E, UM At total depth 1414' FNL, 1254' FWL, Sec. 14, T11N, R11E, UM 5. Type of Well: Development __X Exploratow__ Stratigraph Service__ (asp's 598731, 5959100) (asp's n/a) (asp's 588395, 5963744) (asp's 588357, 5963806) 6. Datum elevation (DF or KB feet) RKB 84 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Z-38 9. Permit number / approval number 198-060 10. APl number 50-029-22873 11. Field / Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 17029 8985 feet Plugs (measured) feet Effective depth: measured 16955 feet Junk (measured) true vertical 8927 feet Casing' Length Size Cemented Measured Depth Conductor 1 10' 20" 260 sx ArcticSet (Approx.) 140' Surface 3072' 9-5/8" 205 sx 'G', 1078 sx CSIII, 21z 3102' sx 'G' Production 11544' 7" 120 sx Class 'G' 11574' Liner 5782' 4-1/2" 620 sx Class 'G' 11247' - 17029' True VerticalDepth 140' 3076' 8752' 8485'-8917' Perforation depth: measured Open Peris 12470 - 620, 12705 - 760, 12810 - 13170, 13425 - 480, 13550 - 14155, 14190 - 335, 14390 - 430, 14690 - 750, 14800 - 845, 15155 - 340, 15425 - 805, 16070 - 250, 16340 - 940 true vertical Open Peris 8992 - 8979, 8973 - 8970, 8968 - 8943, 8935 - 8939, 8943 - 8967, 8968 - 8974, 8976 - 8978, 8980 - 8992, 8996 - 8998, 8995 - 8976, 8968 -8936, 8931 - 8952, 8960 - 8929 Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 TBG @ 11179' MD. Tubing Tail @ 11179'. ~ackers&SSSV(type&measureddepth) 7"x4-1/2" BakerS-3 PKR @ 11179', 7"x4-1/2" ZXP PKR &HMCHanger @ 11247. 4-1/2" HES HXO SSSLN @ 2175'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see atfached) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Oil-ELl Representative Daily Avera.qe Production or Iniection Data Gas-Mci Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ,~ ~-~~_~~~ Title: Technical Assistant DeWayne R. Schnorr ORIGINAL Date June 25 2001 Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLICATE ~ Form 10-404 Rev 06/15/88 · O2/11/2001 02/25/2001 Z-38 Description of Work Completed NRWO OPERATIONS PPROF W/DEFT: FSPL W/DEFT & TRACTOR PPROF W/DEFT: FSPL-DEFT- WELLTEC TRACTOR SUMMARY 02/11/01 UNABLE TO TRACTOR DOWNHOLE DUE TO BOARD IN TRACTOR BEING BURNT, SECOND TOOL WOULD NOT SWITCH BECAUSE OF ADAPTOR BELOW TRACTOR IS NOT OPERATIONAL AFTER THE FIRST TRACTOR FAILED, CAUSE AT PRESENT UNKNOWN, WILL TROUBLE SHOOT AT SWS SHOP. 02/25/01 PPROF WITH TRACTOR - ONLY ONE SUCCESFUL DESCENT COULD BE MADE WITH TRACTOR OVER HORIZONTAL INTERVAL. ONE PASS MADE AT 40 FPM FROM 13550' TO 12400'. ***LEFT WELL ON PROD AND TURNED OVER TO PAD OP*** Fluids Pumped BBLS. Description DIESEL FOR PRESSURE TEST 2 TOTAL MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser, Commissioner THRU: Tom Maunder, P. I. Supervisor DATE: April 21, 2001 FROM: Lou Gdmaldi, SUBJECT: Petroleum Inspector SVS Tests BPX Z-pad Prudhoe Bay Field Saturday, April 21, 2001; I witnessed the three-month SVS retests on BPX Z pad in the Western Operating Area of the Prudhoe Bay Field. Merv Liddelow performed the SVS tests today. The test results (one SSV Failure) are noted on the accompanied SVS test spreadsheet. All well houses were in "OK" condition. This was the first experience I have had with the new SV control system on Z pad and found it to operate quite well. The temperatures today were somewhat mild (+15) and it remains to be seen how:they.will hold:up: dudng next winter's cold season. Wells Z-5 and Z-8 had slow closing SSV's (+ 2 minutes), Merv called the Automation crew and these were being worked on before I left the pad. The pad is being used as a staging area for some pipeline fabrication and has some equipment and material stored on it. This was kept for the most part neat and orderly. SUMMARY: I witnessed the three-month SVS retests on Z pad in the Prudhoe Bay Field. 20 wells, 40 components, Onefailure, 2;4% 34 Wellhouse inspections, no problems. Attachments: SVS PBU Z pad 4-21-01 LG.XLS NON-CONFIDENTIAL SVS PBU Z pad 4-21-01 LG Ala~;ka Oil and Gas Conservation Commissi--~on Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Lou Grimaldi Submitted By: Lou G. Date: Field/Unit~ad: Prudhoe Bay Field, Z.pad Separator psi: LPS 159 HPS 21-A..pr Well Permit Separ Set L/P Test Test Test Date oi~ WAG, GINJ, Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE Z-~I 188066~ 159 '125 12~ p P I Z-02A 1960430 Z-03 1971310 159 125 115 P P Z-04 1891230 , , ,, Z-05 ~960780 159 '125 155 P e Z-06 1880320 159 125 125 .P P Z-07A 1931100 Z-08A 1931280 '159 '125 126 P e 'Z209 1890850 Z-10 1891160 Z-II 1900720 159 125 125 P P Z-12 1891020 Z-13 1900940 159! 125 '125 ' P' P ' '" ' , Z-14A 1980510 ~ ,, z-15 88o88o Z-16' 1920120 159' ' 125 '"125 " e e Z-17 1891390 159: 125 125 P P Z. 18 '" 18309~0 .......... ,, Z-19 1920230 z_5o .... 18,siooo.... z221 18b0420 159' 12'5 125 P e ........ Z~22B ' i~0350 "'159 ' 125 115 e e Z-23A i950430 ~ "159 1~5 125 P P '' Z-24 1890180 1591 125 125 P ~4:: ~,_[,~' ~ ~ ~,.~\~ &? ~-2~' 1881'590 159. 125 '"i25 e e Z-26" 1890520 ..... 159 125 12~ e ' e '' Z-25' 190'0310 159~" 125 125 ~ V ' Z~28. 1881270 '" , , , ,, , , , Z-29 1890650 159! 125 120 P P Z-30 1900230 159 '125 '12'0''P P .... z-31 1881120 z-35~ 19~0340 1'59 125 125 P e Z-33A 1890050 Z-35 1980930 Z-38 ' ' 1980600' 159 125 .... 120: P P RJF 1/16/01 Page 1 of 2 SVS PBU Z pad 4-21-~l~ ~_G Well Permit / Separ Set L/P I TestI TestTest [ Date Number Number / PSI PSI Trip ! Code I C°det C°del Passed [Yells: 20 Components: 40 Failures: ! Failure Rate: I Oil, WAG, GINJ, I GAS or CYCLE I 2.50% E] 90 Day Remarks: Z-5 & 8 Long closure times on SSV. RJF 1/16/01 Page 2 of 2 SVS PBU Z pad 4-21-01 LG MEMORANDUM State of Alaska -Alaska Oil and Gas Conservation Commission TO: Julie Heusser ~""~. ~'~ Commissioner DATE: January 23, 2001 THRU: FROM: Tom Maunder, P. I. Supervisor Jeff Jones, SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit Z,Pad Friday, January 19. 2001: I traveled to BPX's Z Pad in the Prudhoe Bay Field and witnessed surface safety valve system'testing. Merv Liddelow was the BPX representative in charge of testing. As the attached AOGC. C Safety Val~e System Test Report indicates I witnessed the testing of 21 wells and 43 components with 6 failures. The pilot on well Z-03 failed to trip and the pilot on well Z-08 was frozen and once thawed it passed a retest but the SSV on this well had an unacceptable closure time (12-min.). The SSV on well Z-18 also had an unacceptable closure time (15-min.) and the SSV's on wells Z-22B and Z-24 failed to pressure test. The high failure rate on Z Pad requires it be placed on a 90- day test interval. Mr. Liddlow indicated to me today that all failures have been repaired exCept the slow SSV closure of wells Z-08A and Z-18. The hydraulic lines on these wells need to be flushed and he has arranged for the maintenanCe crew to perform the wOrk. Weilhouse inspections were conducted on the 21 wells tested with no exceptions noted. Summarv: I witnessed SVS testing at BPX's PBU Z Pad. 21 wells, 43 components, 6 failures. 13.9% failure rate. 2t wellhouse inspections conducted. Affachment: SVS PBU Z Pad 1-19-01 JJ Alaska Oil and Gas Conservation CommiSSiOn Safety Valve System Test Report Operator: BPX Submitted By: Jeff Jones Date: 1/19/01 Operator Rep: Merv Lidd¢low Field/Unit/Pad: PBF/PBU/Z Pad AOCK2C Rep: _ J¢ffJon¢s _. Separator psi: LPS 159 HPS ' Well Permit Separ' Set L/P Test Test Test Date Oil, WAG, GINJ, Number. Number PSI PSI Trip Code Code Code Passed GAS or CYCLI~ i i i i i i~l i i ii ii i i z-o~ ~880660 ~$6 ~251 ~25 Z-02A 1960430 Z-03 19~L1~10 "i5S3 " 1251 0 1 .... P ....... Z-on ' ' 1891~0 ' Z-65 "1'~00780' 159 ' 125 '120 P ..... P ........ OIL' ~;-~)6 "' 1'88032'0 ...... Z-07A 1931100 Z-08A ' i'931280 1'5'~ 125! ''0 2 43 ' ' 1~-~/0i '' ' 0IL Z-09 1890850 , '~,-10 1891160 . Z-11 1900720 159 125! 125 P P OIL Z-12 1891020 ~;-13 1900940 i59 " 1'25 12~ 'V V ~ ' ' OIL , , Z-14A 1.,980510 .................. I ., , zh5 ~88o88o Z-16 '1920120! '159 1'25; .... .' 125 " ~ '" "P ......... (~IL Z-17 ' '1891'3'90: "- 159 '125 125 P ' P ....... OIL Z-'lB 1890960! i59 125; 12'6 P '43 ...... OIL z_i9 - 1920230 - , , ' .. i · z.:o ".i ,' ' " i ..... " ", ........ 'i ', .... z,2~ ~83o42o , Z-2~B 1960350' 1'59 i2'5 125 P 4 ' - ' ' oIL Z-23A 1950430 ., ., Z~-24" 1890180' 'i59 125: 130 .... P' 4 i3IL Z-25 1881590 159 'i25' 125 ..... P .... p oIL Z-26 1890520 159 125: 125 P P OIL Z-27 '1900310 159 125 " 125 'P P....... OILi ...... , ,, , , , , , Z-28 1881270. Z-29 1890650 ' 159 'i25 " 120' i:'" ' P ....... OIL Z-30 1906230 '159 " 125 115: ' P' P ...... 6iL Z'31 ...... 1881120 ...... · ~'52B .... 1970340 '- 159 ' "i25i "125' P "P .... ." OIL Z-33A 1890050 2750 2600 2500: P P P GINJ Z'~5 .... 1980930 15~ 125'! "'~20" 'P' ' ' P ..... ' OIL 1/24/01 Page 1 of 2 SVS PBU Z Pad 1-19-01 JJ.xls i i i i i I i ~ _ i~ ij ~ ii i W~I Pe~it Separ Set ~ Test ~ T~t T~t Date Number Number PSI PSI Trip Code Code Code Pass~ Z-38 ........ 1980600 159 '125 120 'P ............... , P O~ , , , , , ~ , ,,, , ~, , .. ,, , ,,, , Wells: 21 Components: , 43, Failures:,,, 6, ' Failure Rate: ! 3:9,°/d~i 90 m.¥ . Remarks: Z-08A SSV failed: 12 minute close. Z-18 SSV fafl._'_ed; 15 .minute c!ose,.fr0z, en pilot t ,hawed & passed re,te,~; ..................... 1/24/01 Page 2 of 2 SVS PBU Z Pad 1-19-01 JJ.xls GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 AI'EN: Sherrie NO. 12240 Company Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL Sepia Tape Z-38 ¢I~ t~'~f~ 2- 98434 IMPULSE/GR MD (PDC) 980620 1 1 1 Z-38 98434 IMPULSE/GRTVD (PDC) 980620 i 1 R-20A ~lC. ~ ~'~ ~ i 98623 IMPULSE/GR/RES MD 980715 1 1 1 R-20A 98623 IMPULSE/GR/RES TVD 980715 1 1 R-23A ~ ~ ~1' ~ ¢_~ 99006 IMPULSE/GR/RES MD 971120 1 1 1 R-23A 99006 I MPULSE/GR/RES TVD 971120 ! 1 R-23A 99006 IMPULSE/BOREHOLE PROF 971120 1 ! PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: 1/18/99 BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: R OEIVE JAN 21 1999 Alaska Oil & Gas Cons. Commission Schlumberger GeoQuest 3940 Arctic BIvd AAn?JOrs~ger~i?K 99~3~ qH · o"-I GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 AI'fN: Sherrie NO. 12251 Company Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Cased Hole) Color Well Job # Log Description Date Print Blueline Sepia LIS Tape X-03A 99021 USIT 980617 1 E-04A CBT 990112 1 1 H-31 EX.I ~-~ CBL 990110 1 I Z-38 ~ '~ (~ ~ 98607 MCNL BORAX 981015 1 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: 1/20/99 BP Exploration (Alaska)Inc, Petrotectnical Data Center MB3-3 900 E, Benson Blvd, Anchorage, Alaska 99519-6612 RECEIVED Date Delivered: Oil & Gas Cons. Commission Schlumberger GeoQuest 3940 Arctic Blvd Anchorage, AK ~503 ATI'N: Sh~~~,,~ ~. STATE OF ALASKA '-" 1~1[~ h ~'~/ ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification (~tl~iee.Well [] Oil [] Gas [] Suspended [] Abandoned [] Service- '~'~' ' '~8'~'Co!~_-_..~,.u.~ 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 98-60 398-12B"u~ 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22873 4. Location of well at surface ~"'-:':'~ ........ i~~ 9. Unit or Lease Name J' 'r ~'~ .... ~' ~ ~' '':: i! ~~q, Prudhoe Bay Unit 4310' NSL, 3947' WEb, SEC. 19, T11N, R12E, UM ~ ~,,-~ ~,- At t.o,p of productive interval - ~_~'.~ / l?~'~)ql 10. Well Number 606 NSL, 73' WEb, SEC. 14, T11 N, R11 E, UM~- .~ ,., ~. , ['~'~'~ Z-38 At total depth ;~11. Field and Pool 3872' NSL, 4025' WEb, SEC. 14, T11N, R11E, UM Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = 84.20'I ADL 028245 12. Date Spudded 113. Date T.D. Reached I 14. Date Comp., Su'sp., or Aband.115. Water depth, if offshore 116. No. of Completions 4/14/98I 6/19/98I 6/30/98t N/A MSLI One 17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 17029 8985 FTI 16955 8927 FTI []Yes [] No (Nipple) 2175' MD 1900' (Approx.) 22. Type Electric or Other Logs Run n A t.. ,, MWD, DIP, GR, RES, RFT, DILL, GR, DEN/NEU, CAL, SONIC ! ~,.~ii\j 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP Be'FI-OM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 110' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 30' 3102' 12-1/4" 205 sx 'G', 1078 sx CS III, 214 sx 'G' 7" 26# L-80 27' 11574' 8-1/2" 1120 sx Class 'G' 4-1/2" 12.6# L-80 11247' 17029' 6" ',620 sx Class 'G' 7" 26# L-80 3400' 10978' 8-1/2" ~37 sx Class 'G'; Cut & Abandoned, PR1 24. Perforations open to Production (MD+TVD of Top and i25. TUBING RECORD Bottom and interval, size and number) ,.. SIZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" Gun Diameter, 4 spf 2-3/4" Gun Diameter, 4 spf 4-1/2", 12.6#, L-80 11235' 11179' MD TVD MD TVD 12470' - 12620' 8992' - 8979' 15155' - 15340' 8995' - 8976' 12705' - 12760' 8973' - 8970' 15425' - 15805' 8968' - 8936' ~)6. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. 12810' - 13170' 8968' - 8943' 16070' - 16250' 8931' - 8952' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 13425' - 13480' 8935' - 8939' 16340' - 16940' 8960' - 8929' 13550'- 14155' 8943'- 8967' 11170' Abandonment Plug, 26 Bbls Class 'G' 14190' - 14335' 8968' - 8974' 4000' Set EZSV, 14390' - 14430' 8976' - 8978' 3285' Kick-off Plug, 25 Bbls Class 'G' 14690' - 14750' 8980' - 8992' 14800' - 14845' 8996' - 8998' Freeze Protect with 80 Bbls of Diesel 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) July 19, 1998I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBb GAS-MCF WATER-BBb CHOKE SIZE IGAs-OIL RATIO TEST PERIOD Press.Flew Tubing Casing Pressure 24-HouRCALCULATEDRATE OIL-BBb GAS-MCF WATER-BBb OIL GRAVITY-APl (CORR) 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 11567' 8747' Shublik 11603' 8776' Sadlerochit 11809' 8924' '4/~?$/¢80//~,~?$,,, 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify tha~t the fore~ and correct to the best of my knowledge Signed ~-_~-~ ~ ~. ~ ~ Dan Stone Title Engineering Supervisor Date Z-38 98-60 398-126 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERA'-' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM ,5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 2?: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Well Compliance Report - File on Left side of folder 198-060-0 MD 17029 TVD 08985 PRUDHOE BAY UNIT Completion Date: Z-38 50- 029-22873-00 ~" Completed Status: 1-OIL BP EXPLORATION Current: Name L BHCS L CDR-MD L CDR-TVD .~H'~A L L DIFL/GR ~AL L IMP-GR-MD t~AL L IMP-GR-TVD t~NAL L MCNL CX~AL L PEX-AIT /_...FINAL L PEX-ARRAY SONIC J.~NAL L PEX-ARRAY.SONIC L...~AL L PEX-CN/GR t.~NAL L PEX-IL/MICRO ~"F~AL L PEX-NDT C4~AL L RFT-RAW ,-~NAL L ZDL/CN/GR c~FINAL R SRVY RPT R SRVY RPT T 8391 j T 8617 t~ Interval 11350-17010 ~ 100-1 '770 PB1 100-8850 PB1 11350-17010 ~la_thO 3200-1300 12060-15175 3102-9028 PB1 3102-9028 PB1 3102-9028 PBI 3102-9028 PB1 3102-9028 PB1 3102-9028 PB1 3102-9028 PB1 ~UM 0-11822. PB1 ~UM 3204.84-16968. SCHLUM PEX-~T PBI SCHLUM CD~MP PB1 T 8931 SCHLUM DIFL/ZDL/BHC/CN T 8962 ~ SCHLUM IMP-GR Sent Received OH 6/24/98 OH 8/18/98 OH 8/18/98 OH 6/24/98 OH 1 / 18/99 OH 1 / 18/99 CH 2 1/20/99 OH 6/1/98 OH 6/1/98 OH 6/1/98 OH 6/1/98 OH 6/1/98 OH 6/1/98 OH 6/1/98 OH 6/24/98 OH 8/19/98 OH 8/19/98 OH 6/1/98 OH 8/18/98 OH 12/23/98 OH 1/18/99 CH 1/20/99 T 8963 ~ SCHLUM MCNL Daily Well Ops '~/[//~/~'~/'~ O../3~/~t~ Are Dry Ditch Samples Required? yes~-~And Received? y~s no --- Was the well cored? yes ~. Analysis Description ~ yes no ~ample SetUP- Comments: T/C/D 8/20/98 T 8/20/98 T 1/21/99 1/21/99 1/21/99 6/11/98 6/11/98 6/11/98 6/11/98 6/11/98 6/11/98 6/11/98 6~ 8/21/98 8/21/98 6/11/98 8/20/98 1/5/99 1/21/99 1/21/99 Tuesday, May 30, 2000 Page 1 of 1 Operator BP Exploration Performance Enquiry Report Date 16:27, 31 Jul 98 Formation Integrity Test Page The analysis is from - 16:30, 17 Apr 98 - to - 12:00, 01 May 98 , Programs in Result Table: Z-38 Drill and Complete Well Type Time From Z-38 Event 16:30, 17 Apr 98 Z-38 Event 17:30, 29 Apr 98 Z-38 Event 12:00, 01 May 98 Time TO Duration DescriDtion E.M.W.(equivalent mud weight) 16:30, 17 ADr 98 0 hr 0 min Obtained leak off 13.6 17:30, 29 ADr 98 0 hr 0 min Obtained required level of integrity 12.5 12:00, 01 May 98 0 hr 0 min Obtained required level of integrity 9.5 Depth MDR 4409.0 11605.0 11617.0 Hole Size MDR 8-1/2 6 6 Facility PB Z Pad Progress Report Well Z-38 Rig (null) Page Date 1 21 July 98 Date/Time 12 Apr 98 13 Apr 98 14 Apr 98 15 Apr 98 16 Apr 98 17 Apr 98 18 Apr 98 19 Apr 98 19:00-06:00 06:00-07:00 07:00-20:30 20:30-21:00 21:00-22:00 22:00-01:00 01:00-06:00 06:00-14:00 14:00-14:30 14:30-15:00 15:00-03:30 03:30-04:00 04:00-04:30 04:30-05:00 05:00-06:00 06:00-15:00 15:00-15:30 15:30-16:30 16:30-17:30 17:30-19:00 19:00-20:00 20:00-22:00 22:00-23:00 23:00-00:00 00:00-06:00 06:00-07:00 07:00-08:30 08:30-11:30 11:30-13:30 13:30-17:30 17:30-03:30 03:30-04:30 04:30-06:00 06:00-09:00 09:00-09:30 09:30-10:30 10:30-11:00 11:00-12:00 12:00-12:30 12:30-13:30 13:30-15:30 15:30-16:00 16:00-16:30 16:30-06:00 06:00-07:00 07:00-08:15 08:15-09:00 09:00-06:00 06:00-11:30 11:30-12:00 12:00-12:30 12:30-13:45 13:45-14:30 14:30-06:00 Duration llhr 1 hr 13-1/2 hr 1/2 hr 1 hr 3 hr 5 hr 8hr 1/2 hr 1/2 hr 12-1/2 hr 1/2 hr 1/2 hr 1/2 hr lhr 9 hr 1/2 hr 1 hr 1 hr 1-1/2 hr 1 hr 2hr 1 hr 1 hr 6hr lhr 1-1/2 hr 3 hr 2 hr 4 hr 10hr lhr 1-1/2 hr 3 hr 1/2 hr 1 hr 1/2 hr 1 hr 1/2 hr 1 hr 2hr 1/2 hr 1/2 hr 13-1/2 hr 1 hr 1-1/4 hr 3/4 hr 21hr 5-1/2 hr 1/2 hr 1/2hr 1-1/4 hr 3/4 hr 15-1/2 hr Activity Rig moved 95.00 % Rig moved 100.00 % (cont...) Rigged up Drillfloor / Derrick Held safety meeting Functioned Divertor Made up BHA no. 1 Drilled to 450.0 ft Drilled to 1008.0 ft (cont...) Pulled out of hole to 160.0 ft R.I.H. to 1008.0 ft Drilled to 2185.0 ft Circulated at 2185.0 ft Pulled out of hole to 1008.0 ft R.I.H. to 2185.0 ft Drilled to 2275.0 ft Drilled to 3112.0 ft Circulated at 3112.0 ft Pulled out of hole to 812.0 ft R.I.H. to 3112.0 ft Circulated at 3112.0 ft Pulled out of hole to 208.0 ft Pulled BHA Installed Casing handling equipment Held safety meeting Ran Casing to 3102.0 ft (9-5/8in OD) Circulated at 3102.0 ft Mixed and pumped slurry - 41.000 bbl Circulated at 2611.0 ft Mixed and pumped slurry - 420.000 bbl Installed Casing head Installed BOP stack Made up BHA no. 2 Tested BOP stack Tested BOP stack R.I.H. to 2614.0 ft Circulated at 2614.0 ft Drilled cement to 2615.0 ft R.I.H. to 3017.0 ft Circulated at 3017.0 ft Tested Casing - Via annulus and string Drilled to 3132.0 ft Circulated at 3132.0 ft Performed formation integrity test Drilled to 4409.0 ft Drilled to 4595.0 ft Pulled out of hole to 3102.0 ft R.I.H. to 4595.0 ft Drilled to 6277.0 ft Drilled to 6652.0 ft Circulated at 6652.0 ft Held drill (Kick while tripping) Pulled out of hole to 4500.0 ft R.I.H. to 6652.0 ft Drilled to 7600.0 ft Progress Report Facility PB Z Pad Well Z-38 Rig (null) Page 2 Date 21 July 98 Date/Time 20 Apr 98 06:00-12:00 12:00-00:00 21 Apr 98 00:00-06:00 06:00-08:30 08:30-09:30 09:30-11:00 11:00-11:15 11:15-12:00 12:00-14:00 14:00-17:00 17:00-18:30 18:30-18:45 18:45-05:15 22 Apr 98 05:15-06:00 06:00-07:15 07:15-11:00 11:00-13:00 13:00-16:00 16:00-17:00 17:00-06:00 23 Apr 98 06:00-16:30 16:30-17:00 17:00-17:45 17:45-18:30 18:30-06:00 24 Apr 98 06:00-14:30 14:30-16:00 16:00-17:00 17:00-00:30 25 Apr 98 00:30-02:30 02:30-06:00 06:00-07:00 07:00-10:00 10:00-10:30 10:30-11:00 11:00-15:15 15:15-16:00 16:00-00:00 26 Apr 98 00:00-01:30 01:30-03:30 03:30-05:30 05:30-06:00 06:00-00:00 27 Apr 98 00:00-01:30 01:30-06:00 06:00-09:00 09:00-09:30 09:30-11:00 11:00-20:30 20:30-22:30 22:30-00:00 28 Apr 98 00:00-04:00 04:00-06:00 06:00-14:30 Duration 6 hr 12hr 6 hr 2-1/2 hr 1 hr 1-1/2 hr 1/4 hr 3/4 hr 2 hr 3 hr 1-1/2 hr 1/4 hr 10-1/2 hr 3/4 hr 1-1/4 hr 3-3/4 hr 2 hr 3hr 1 hr 13hr 10-1/2 hr 1/2 hr 3/4 hr 3/4 hr 11-1/2 hr 8-1/2 hr 1-1/2 hr 1 hr 7-1/2 hr 2hr 3-1/2 hr lhr 3 hr 1/2 hr 1/2 hr 4-1/4 hr 3/4 hr 8 hr 1-1/2 hr 2 hr 2hr 1/2 hr 18hr 1-1/2 hr 4-1/2 hr 3 hr 1/2 hr 1-1/2 hr 9-1/2 hr 2hr 1-1/2 hr 4hr 2 hr 8-1/2 hr Activity Drilled to 7970.0 ft Drilled to 8623.0 ft Drilled to 8813.0 ft Drilled to 9033.0 ft Circulated at 9033.0 ft Pulled out of hole to 6250.0 ft Flow check R.I.H. to 9033.0 ft Circulated at 9033.0 ft Pulled out of hole to 840.0 fl Pulled BHA Held safety meeting Conducted electric cable operations Serviced Drillfloor / Derrick Flow check Conducted electric cable operations Made up BHA no. 3 R.I.H. to 9033.0 ft Circulated at 9033.0 ft Drilled to 9800.0 ft Drilled to 10389.0 fl Circulated at 10389.0 ft Pulled out of hole to 8900.0 fl R.I.H. to 10389.0 ft Drilled to 11046.0 ft Drilled to 11605.0 ft Circulated at 11605.0 ft Circulated at 11605.0 ft Circulated at 11605.0 ft Circulated at 11605.0 ft Pulled out of hole to 6925.0 ft Pulled out of hole to 3050.0 fl R.I.H. to 11575.0 ft Circulated at 11565.0 ft Reamed to 11603.0 ft Circulated at 11605.0 ft Pulled out of hole to 11100.0 ft Pulled out of hole to 820.0 fl Pulled BHA Installed BOP stack Installed Casing handling equipment Ran Casing to 90.0 ft (7in OD) Ran Casing to 10978.0 ft (7in OD) Circulated at 10978.0 ft Worked stuck pipe at 10978.0 fl Circulated at 10978.0 fl Mixed and pumped slurry - 64.000 bbl Displaced slurry - 406.830 bbl Installed Casing hanger Rigged up BOP stack Rigged down Casing handling equipment Tested BOP stack Repaired Rotary table Repaired Rotary table Progress Report Facility PB Z Pad Well Z-38 Rig (null) Page 3 Date 21 July 98 Date/Time 14:30-16:30 16:30-03:30 29 Apr 98 03:30-04:30 04:30-06:00 06:00-11:00 11:00-12:00 12:00-12:30 12:30-13:00 13:00-16:00 16:00-17:00 17:00-17:30 17:30-21:00 21:00-04:00 30 Apr 98 04:00-05:00 05:00-06:00 06:00-08:00 08:00-09:00 09:00-17:00 17:00-18:30 18:30-19:00 19:00-19:30 19:30-20:00 20:00-21:30 21:30-22:00 22:00-01:30 01 May 98 01:30-03:00 03:00-06:00 06:00-06:30 06:30-07:00 07:00-07:30 07:30-09:00 09:00-09:30 09:30-11:00 11:00-11:30 11:30-12:00 12:00-15:30 15:30-16:00 16:00-18:00 18:00-18:30 18:30-19:00 19:00-20:30 20:30-01:30 02 May 98 01:30-03:30 03:30-04:30 04:30-06:00 06:00-07:00 07:00-07:30 07:30-14:30 14:30-15:00 15:00-16:00 16:00-18:00 18:00-00:00 03 May 98 00:00-01:00 01:00-02:00 Duration 2hr llhr 1 hr 1-1/2 hr 5 hr 1 hr 1/2 hr 1/2 hr 3 hr 1 hr 1/2 hr 3-1/2 hr 7 hr lhr 1 hr 2 hr 1 hr 8hr 1-1/2 hr 1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 3-1/2 hr 1-1/2 hr 3hr 1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 2hr 1/2 hr 1/2 hr 1-1/2 hr 5hr 2 hr 1 hr 1-1/2 hr 1 hr 1/2 hr 7hr 1/2 hr lhr 2hr 6 hr 1 hr 1 hr Activity Installed Kelly R.I.H. to 10515.0 ft Serviced Block line Serviced Kelly Drilled cement to 10891.0 ft Circulated at 10691.0 ft Tested Casing Held drill (Kick (well kill)) Drilled installed equipment - Float collar Circulated at 10998.0 ft Performed formation integrity test Circulated at 10998.0 ft Reamed to 11181.0 ft Circulated at 11181.0 ft Reamed to 11210.0 ft Reamed to 11255.0 ft (cont...) Circulated at 11255.0 ft Reamed to 11595.0 ft Circulated at 11595.0 ft Pulled out of hole to 10901.0 ft Held safety meeting R.I.H. to 11595.0 ft Circulated at 11595.0 ft Pulled out of hole to 10901.0 ft Serviced Fluid system Circulated at 10901.0 ft Rest hole at 10901.0 ft R.I.H. to 11284.0 ft Circulated at 11284.0 ft R.I.H. to 11540.0 ft Washed to 11595.0 ft Drilled to 11617.0 ft Circulated at 11617.0 ft Pulled out of hole to 10901.0 ft Performed formation integrity test Pulled out of hole to 724.0 ft Pulled BHA Made up BHA no. 5 R.I.H. to 1470.0 ft Pulled out of hole to 0.0 ft Serviced Steerable motor R.I.H. to 11005.0 ft Washed to 11368.0 ft Jarred stuck pipe at 11368.0 ft Circulated at 11335.0 ft Circulated at 11335.0 ft (cont...) Pulled out of hole to 10901.0 ft Circulated at 10901.0 ft R.I.H. to 11337.0 ft Reamed to 11400.0 ft Worked stuck pipe at 11385.0 ft Reamed to 11617.0 ft Circulated at 11617.0 ft Functioned downhole tools at 11617.0 ft Progress Report Facility PB Z Pad Well Z-38 Rig (null) Page 4 Date 21 July 98 Date/Time 02:00-06:00 06:00-03:30 04 May 98 03:30-05:00 05:00-06:00 06:00-09:00 09:00-09:15 09:15-10:00 10:00-11:30 11:30-12:00 12:00-16:30 16:30-22:00 22:00-22:30 22:30-00:00 05 May 98 00:00-03:30 03:30-04:30 04:30-05:30 05:30-06:00 06:00-08:00 08:30-09:30 09:30-13:00 13:00-15:00 15:00-15:30 '15:30-15:45 15:45-16:00 16:00-17:00 17:00-18:00 18:00-18:30 18:30-00:00 06 May 98 00:00-00:30 00:30-01:30 01:30-02:30 02:30-03:30 03:30-05:00 05:00-06:00 06:00-06:30 06:30-07:30 07:30-08:00 08:00-08:30 08:30-10:30 10:30-12:00 12:00-13:00 13:00-21:00 21:00-22:00 22:00-23:00 23:00-23:30 23:30-01:00 07 May 98 01:00-02:00 02:00-02:15 02:15-02:30 02:30-02:45 02:45-03:15 03:15-03:30 03:30-06:00 06:00-07:30 Duration 4hr 21-1/2 hr 1-1/2 hr 1 hr 3 hr 1/4 hr 3/4 hr 1-1/2 hr 1/2 hr 4-1/2 hr 5-1/2 hr 1/2hr 1-1/2 hr 3-1/2 hr lhr 1 hr 1/2 hr 2hr lhr 3-1/2 hr 2hr 1/2 hr 1/4 hr 1/4 hr 1 hr 1 hr 1/2 hr 5-1/2 hr 1/2 hr lhr lhr lhr 1-1/2 hr lhr 1/2 hr lhr 1/2 hr 1/2 hr 2hr 1-1/2 hr 1 hr 8hr lhr 1 hr 1/2 hr 1-1/2 hr lhr 1/4 hr 1/4 hr 1/4 hr 1/2 hr 1/4 hr 2-1/2 hr 1-1/2 hr Activity Drilled to 11665.0 ft Drilled to 11822.0 ft (cont...) Circulated at 11822.0 ft Pulled out of hole to 10882.0 ft Pulled out of hole to 233.0 ft (cont...) Pulled BHA Downloaded MWD tool Made up BHA no. 6 Functioned downhole tools at 233.0 ft R.I.H. to 11356.0 ft Worked toolstring at 11415.0 ft Pulled out of hole to 10978.0 ft Circulated at 10978.0 ft Pulled out of hole to 233.0 ft Pulled BHA Retrieved Wear bushing Tested BOP stack Tested BOP stack (cont...) Serviced Block line Ran Drillpipe in stands to 10976.0 ft Rig waited: Equipment Ran Drillpipe in stands to 11170.0 ft Mixed and pumped slurry - 25.500 bbl Displaced slurry - 61.860 bbl Pulled Drillpipe in stands to 10600.0 ft Reverse circulated at 10600.0 ft Circulated at 10600.0 ft Laid down 6653.0 ft of 3-1/2in OD drill pipe Circulated at 4037.0 ft Pulled Drillpipe in stands to 0.0 ft Rigged up Logging/braided cable equipment Installed Bridge plug Rig waited: Production facilities Installed Bridge plug Tested Casing - Via annulus and string Conducted electric cable operations Rigged down Logging/braided cable equipment Retrieved Seal assembly Pulled Casing on retrieval string to 3400.0 ft Retrieved Slip & seal assembly Pulled Casing on retrieval string to 3400.0 ft Laid down 3400.0 ft of Casing Rigged down Casing handling equipment Tested BOP stack Installed Wear bushing Ran Drillpipe in stands to 3600.0 ft Circulated at 3600.0 ft Mixed and pumped slurry - 25.000 bbl Displaced slurry - 22.000 bbl Pulled Drillpipe in stands to 3036.0 ft Reverse circulated at 3036.0 ft Circulated at 3036.0 ft Laid down 3036.0 ft of 3-1/2in OD drill pipe Laid down 3036.0 ft of 3-1/2in OD drill pipe (cont...) Progress Report Facility PB Z Pad Well Z-38 Rig (null) Page 5 Date 21 July 98 Date/Time 07:30-09:30 09:30-10:00 10:00-13:00 13:00-14:15 14:15-14:30 14:30-15:00 15:00-15:30 15:30-16:00 16:00-17:00 17:00-19:30 19:30-21:00 21:00-06:00 08 May 98 06:00-18:30 18:30-20:30 20:30-22:00 22:00-00:00 09 May 98 00:00-01:00 01:00-02:30 02:30-06:00 06:00-10:30 10:30-11:00 11:00-14:00 14:00-14:30 14:30-20:30 20:30-21:30 21:30-22:00 22:00-22:30 22:30-06:00 10 May 98 06:00-07:30 07:30-08:00 08:00-20:00 20:00-21:00 21:00-06:00 11 May 98 06:00-09:00 09:00-09:30 09:30-10:15 10:15-11:00 11:00-06:00 12 May 98 06:00-17:30 17:30-20:30 20:30-21:00 21:00-01:00 13 May 98 01:00-02:00 02:00-02:30 02:30-03:00 03:00-03:30 03:30-05:30 05:30-06:00 06:00-09:30 09:30-10:30 10:30-13:30 13:30-14:30 14:30-06:00 14 May 98 06:00-09:30 Duration 2hr 1/2hr 3hr 1-1/4 hr 1/4 hr 1/2 hr 1/2 hr 1/2 hr 1 hr 2-1/2 hr 1-1/2 hr 9 hr 12-1/2 hr 2 hr 1-1/2 hr 2hr lhr 1-1/2 hr 3-1/2 hr 4-1/2 hr 1/2 hr 3hr 1/2 hr 6 hr lhr 1/2 hr 1/2 hr 7-1/2 hr 1-1/2 hr 1/2 hr 12hr 1 hr 9 hr 3hr 1/2 hr 3/4 hr 3/4 hr 19hr 11-1/2 hr 3 hr 1/2 hr 4hr 1 hr 1/2 hr 1/2 hr 1/2 hr 2 hr 1/2 hr 3-1/2 hr lhr 3hr 1 hr 15-1/2 hr 3-1/2 hr Activity Made up BHA no. 7 Rigged up Top ram R.I.H. to 3000.0 ft Singled in drill pipe to 3278.0 ft Drilled cement to 3285.0 ft Circulated at 3285.0 ft Circulated at 3285.0 ft Pulled out of hole to 800.0 ft Pulled BHA Made up BHA no. 8 R.I.H. to 3285.0 ft Drilled to 3370.0 ft Drilled to 4220.0 ft (cont...) Circulated at 4220.0 ft Pulled out of hole to 803.0 ft Pulled BHA Made up BHA no. 9 R.I.H. to 4220.0 ft Drilled to 4524.0 ft Drilled to 4750.0 ft (cont...) Held drill (Abandonment) Drilled to 5109.0 ft Circulated at 5109.0 ft Drilled to 5512.0 ft Circulated at 5512.0 ft Pulled out of hole to 4220.0 ft R.I.H. to 5512.0 ft Drilled to 6160.0 ft Drilled to 6291.0 ft (cont...) Circulated at 6291.0 ft Drilled to 7196.0 ft Circulated at 7196.0 ft Drilled to 7850.0 ft Drilled to 8103.0 ft (cont...) Circulated at 8103.0 ft Pulled out of hole to 5512.0 ft R.I.H. to 8103.0 ft Drilled to 9257.0 ft Drilled to 9850.0 ft (cont...) Circulated at 9850.0 ft Flow check Pulled out of hole to 823.0 ft Pulled BHA Retrieved Wear bushing Installed BOP test plug assembly Tested Choke manifold Tested BOP stack Installed Wear bushing Made up BHA no. 10 Serviced Block line R.I.H. to 9800.0 ft Circulated at 9850.0 ft Drilled to 10665.0 ft Drilled to 10809.0 ft Progress Report Facility PB Z Pad Well Z-38 Rig (null) Page 6 Date 21 July 98 Date/Time 09:30-12:15 12:15-13:30 13:30-14:45 14:45-06:00 15 May 98 06:00-06:30 06:30-10:30 10:30-12:00 12:00-13:00 13:00-14:30 14:30-16:00 16:00-20:15 20:15-20:30 20:30-03:00 16 May 98 03:00-03:30 03:30-06:00 06:00-06:30 06:30-08:30 08:30-10:00 10:00-23:30 23:30-00:45 17 May 98 00:45-04:00 06:00-08:30 08:30-12:00 12:00-20:30 20:30-22:00 18 May 98 06:00-07:30 07:30-09:30 09:30-13:00 13:00-13:30 13:30-14:30 14:30-16:30 16:30-18:00 18:00-20:30 20:30-00:00 19 May 98 00:00-00:45 06:00-08:30 08:30-12:00 12:00-15:30 15:30-18:30 18:30-19:00 19:00-00:00 20 May 98 00:00-00:30 00:30-04:00 04:00-05:30 05:30-06:00 06:00-10:15 10:15-10:45 10:45-11:00 11:00-13:15 13:15-18:15 18:15-20:30 20:30-20:45 20:45-23:30 23:30-03:00 Duration 2-3/4 hr 1-1/4 hr 1-1/4 hr 15-1/4 hr 1/2 hr 4 hr 1-1/2 hr 1 hr 1-1/2 hr 1-1/2 hr 4-1/4 hr 1/4 hr 6-1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 2hr 1-1/2 hr 13-1/2 hr 1-1/4 hr 3-1/4 hr 2-1/2 hr 3-1/2 hr 8-1/2 hr 1-1/2 hr 1-1/2 hr 2 hr 3-1/2 hr 1/2 hr 1 hr 2hr 1-1/2 hr 2-1/2 hr 3-1/2 hr 3/4 hr 2-1/2 hr 3-1/2 hr 3~1/2 hr 3 hr 1/2 hr 5hr 1/2 hr 3-1/2 hr 1-1/2 hr 1/2 hr 4-1/4 hr 1/2 hr 1/4 hr 2-1/4 hr 5 hr 2-1/4 hr 1/4 hr 2-3/4 hr 3-1/2 hr Activity Pulled out of hole to 8890.0 ft R.I.H. to 10809.0 ft Drilled to 10822.0 ft Drilled to 11527.0 ft Drilled to 11552.0 ft Drilled to 11574.0 ft Circulated at 11574.0 ft Circulated at 11574.0 ft Pulled out of hole to 8900.0 ft R.I.H. to 11574.0 ft Circulated at 11555.0 ft Circulated at 11555.0 ft Laid down 8455.0 ft of 5in OD drill pipe Held drill (Kick while tripping) Pulled BHA Removed Drillstring handling equipment Installed BOP stack Installed Casing handling equipment Ran Casing to 15534.0 ft (7in OD) Circulated at 15574.0 ft Circulated at 15574.0 ft Removed BOP stack Installed Casing hanger Installed BOP stack Installed Kelly R.I.H. to 5000.0 ft Tested Kelly/top drive hose R.I.H. to 11586.0 ft Circulated at 11586.0 ft Tested Casing - Via string Drilled cement to 11574.0 ft Drilled to 11595.0 ft Circulated at 11595.0 ft Drilled to 11689.0 ft Flow check Circulated at 111652.0 ft Monitor wellbore pressures Circulated closed in well at 11689.0 ft Monitor wellbore pressures Held safety meeting Circulated closed in well at 11689.0 ft Monitor wellbore pressures Circulated closed in well at 11689.0 ft Monitor wellbore pressures Circulated closed in well at 11689.0 ft Circulated closed in well at 11689.0 ft Circulated closed in well at 11689.0 ft Monitor wellbore pressures Circulated closed in well at 11689.0 ft Circulated at 11689.0 ft Circulated at 11689.0 ft Circulated at 11689.0 ft Circulated at 11689.0 ft Circulated at 11689.0 ft Progress Report Facility PB Z Pad Well Z-38 Rig (null) Page 7 Date 21 July 98 Date/Time 21 May 98 03:00-06:00 06:00-11:45 11:45-12:30 12:30-15:45 15:45-18:30 18:30-19:00 19:00-19:30 19:30-00:00 22 May 98 00:00-01:30 01:30-02:00 02:00-03:00 03:00-06:00 06:00-09:00 09:00-15:00 15:00-19:00 19:00-20:00 20:00-21:00 21:00-00:30 23 May 98 00:30-03:45 03:45-04:00 04:00-04:15 04:15-06:00 06:00-08:00 08:00-12:30 12:30-15:30 15:30-15:45 15:45-17:00 17:00-19:00 19:00-19:15 19:15-21:45 21:45-22:00 22:00-00:30 24 May 98 00:30-02:00 02:00-05:15 05:15-06:00 06:00-22:45 22:45-01:00 25 May 98 01:00-02:00 02:00-06:00 06:00-11:00 11:00-13:30 13:30-16:00 16:00-17:00 17:00-19:00 19:00-20:00 20:00-21:00 21:00-22:00 22:00-23:00 23:00-00:30 26 May 98 00:30-01:00 01:00-03:00 03:00-06:00 06:00-07:30 07:30-10:30 Duration 3hr 5-3/4 hr 3/4 hr 3-1/4 hr 2-3/4 hr 1/2 hr 1/2 hr 4-1/2 hr 1-1/2 hr 1/2 hr 1 hr 3 hr 3 hr 6hr 4hr 1 hr 1 hr 3-1/2 hr 3-1/4 hr 1/4 hr 1/4 hr 1-3/4 hr 2hr 4-1/2 hr 3hr 1/4 hr 1-1/4 hr 2 hr 1/4 hr 2-1/2 hr 1/4 hr 2-1/2 hr 1-1/2 hr 3-1/4 hr 3/4 hr 16-3/4 hr 2-1/4 hr 1 hr 4hr 5 hr 2-1/2 hr 2-1/2 hr 1 hr 2hr 1 hr 1 hr 1 hr lhr 1-1/2 hr 1/2 hr 2 hr 3 hr 1-1/2 hr 3 hr Activity Circulated closed in well at 11689.0 ft Circulated at 11689.0 ft Flow check Circulated at 11663.0 ft Flow check Strip out of well from 11663.0 ft to 11580.0 ft Circulated at 1930.0 ft Circulated closed in well at 11580.0 ft Circulated at 11580.0 ft Bullhead well Circulated at 11572.0 ft Monitor wellbore pressures Monitor wellbore pressures (cont...) Conducted electric cable operations Perforated Circulated at 11304.0 ft Monitor wellbore pressures Circulated at 11304.0 ft Circulated at 10304.0 ft Flow check Monitor wellbore pressures Circulated closed in well at 11304.0 ft Circulated at 11304.0 ft Flow check Flow check Held safety meeting Flow check Flow check Held safety meeting Circulated at 11572.0 ft Flow check Circulated at 11572.0 ft Flow check Pulled out of hole to 9682.0 ft Flow check Pulled out of hole to 319.0 ft Pulled BHA Made up BHA no. 12 R.I.H. to 3850.0 ft R.I.H. to 11300.0 ft Circulated at 11300.0 ft Washed to 11574.0 ft Circulated at 11574.0 ft Washed to 11689.0 ft Circulated at 11689.0 ft Drilled to 11709.0 ft Circulated at 11709.0 ft Drilled to 11719.0 ft Circulated at 11719.0 ft Drilled to 11729.0 ft Circulated at 11729.0 ft Flow check Flow check Circulated at 11729.0 ft Progress Report Facility PB Z Pad Well Z-38 Rig (null) Page 8 Date 21 July 98 Date/Time 10:30-12:15 12:15-13:30 13:30-16:30 16:30-20:15 20:15-02:00 27 May 98 02:00-04:30 04:30-06:00 06:00-08:30 08:30-09:30 09:30-16:00 16:00-18:00 18:00-22:00 22:00-02:30 28 May 98 02:30-03:30 03:30-04:30 04:30-06:00 06:00-08:00 08:00-10:00 10:00-15:00 15:00-21:00 21:00-22:30 22:30-23:00 23:00-23:45 23:45-00:30 29 May 98 00:30-00:45 00:45-06:00 06:00-06:05 06:05-07:00 07:00-09:00 09:00-13:30 13:30-15:30 15:30-20:30 20:30-21:45 21:45-06:00 30 May 98 06:00-15:00 15:00-16:00 16:00-17:00 17:00-17:15 17:15-18:45 18:45-19:00 19:00-19:45 19:45-06:00 31 May 98 06:00-06:05 06:05-07:00 07:00-09:30 09:30-10:00 10:00-11:00 11:00-13:30 13:30-03:00 01 Jun 98 03:00-06:00 06:00-10:00 10:00-10:30 10:30-11:00 11:00-12:00 Duration 1-3/4 hr 1-1/4 hr 3 hr 3-3/4 hr 5-3/4 hr 2-1/2 hr 1-1/2 hr 2-1/2 hr lhr 6-1/2 hr 2 hr 4 hr 4-1/2 hr lhr lhr 1-1/2 hr 2hr 2 hr 5 hr 6hr 1-1/2 hr 1/2 hr 3/4 hr 3/4 hr 1/4 hr 5-1/4 hr 0hr 3/4 hr 2hr 4-1/2 hr 2 hr 5 hr 1-1/4 hr 8-1/4 hr 9 hr 1 hr lhr 1/4 hr 1-1/2 hr 1/4 hr 3/4 hr 10-1/4 hr 0 hr 3/4 hr 2-1/2 hr 1/2 hr 1 hr 2-1/2 hr 13-1/2 hr 3 hr 4 hr 1/2 hr 1/2 hr lhr Activity Flow check Pulled out of hole to 11550.0 ft Circulated at 11550.0 ft Flow check Circulated at 11550.0 ft Circulated at 11550.0 ft Circulated at 11550.0 ft Circulated at 11551.0 ft Rest hole at 11551.0 ft Circulated at 11551.0 ft Rest hole at 11551.0 ft Circulated at 11551.0 ft Rest hole at 11551.0 ft Pulled out of hole to 11168.0 ft R.I.H. to 11729.0 ft Circulated at 11729.0 ft Circulated at 11729.0 ft (cont...) Rest hole at 11729.0 ft Pumped out of hole to 10753.0 ft Rest hole at 10753.0 ft Pulled out of hole to 10570.0 ft R.I.H. to 10753.0 ft Pumped out of hole to 10570.0 ft Rigged up High pressure lines Held safety meeting Pumped out of hole to 8950.0 ft Pumped out of hole to 8950.0 ft (cont...) Rest hole at 8950.0 ft Pumped out of hole to 8170.0 ft Circulated at 8170.0 ft Rest hole at 8170.0 ft Pumped out of hole to 6239.0 ft Rest hole at 6259.0 ft Pumped out of hole to 3307.0 ft Pumped out of hole to 3307.0 ft (cont...) Pulled BHA Rigged up Top ram Held safety meeting Made up DST tools - DST downhole equipment Tested DST tools - DST downhole equipment Made up DST tools - DST downhole equipment Ran Tubing to 4-1/2in (5000.0 ft OD) Ran Tubing to 5000.0 ft (4-1/2in OD) (cont...) Installed DST downhole equipment Tested All functions Retrieved BOP test plug assembly Removed DST downhole equipment Circulated at 5000.0 ft Ran Tubing to 11163.0 ft (4-1/2in OD) Circulated at 11250.0 ft Circulated at 11250.0 ft (cont...) Rigged up Surface test tree Functioned Retrievable packer Tested High pressure lines Progress Report Facility PB Z Pad Well Z-38 Page 9 Rig (null) Date 21 July 98 Date/Time 02 Jun 98 03 Jun 98 04 Jun 98 05 Jun 98 12:00-12:15 12:15-12:30 12:30-13:00 13:00-14:00 14:00-15:30 15:30-16:00 16:00-16:50 16:50-17:00 17:00-18:00 18:00-18:10 18:10-18:30 18:30-18:45 18:45-19:00 19:00-20:00 20:00-21:45 21:45-22:05 22:05-22:10 22:10-23:10 23:10-00:15 00:15-02:15 02:15-02:30 02:30-06:00 06:00-00:00 00:00-06:00 06:00-04:00 04:00-04:15 04:15-04:40 04:40-04:45 04:45-06:00 06:00-06:15 06:15-07:15 07:15-09:00 09:00-10:00 10:00-17:00 17:00-18:00 18:00-19:00 19:00-20:30 20:30-20:45 20:45-22:00 22:00-23:00 23:00-01:30 01:30-05:00 05:00-05:45 05:45-06:00 06:00-10:30 10:30-10:45 10:45-11:00 11:00-12:15 12:15-13:00 13:00-13:30 13:30-15:00 15:00-16:00 16:00-18:15 Duration 1/4 hr 1/4 hr 1/2 hr 1 hr 1-1/2 hr 1/2 hr 3/4 hr 0hr lhr 0 hr 1/4 hr 1/4 hr 1/4 hr lhr 1-3/4 hr 1/4 hr 0 hr 1 hr 1 hr 2 hr 1/4 hr 3-1/2 hr 18hr 6hr 22 hr 1/4 hr 1/4 hr 0 hr 1-1/4 hr 1/4 hr lhr I-3/4 hr 1 hr 7hr 1 hr 1 hr 1-1/2 hr 1/4hr 1-1/4 hr 1 hr 2-1/2 hr 3-1/2 hr 3/4 hr 1/4 hr 4-1/2 hr 1/4 hr 1/4 hr 1-1/4 hr 3/4 hr 1/2 hr 1-1/2 hr lhr 2-1/4 hr Activity Tested Retrievable packer - Via annulus Tested Tubing - Via string Held safety meeting Circulated at 11159.0 ft Repaired Additional services Circulated at 11159.0 ft Functioned DST equipment Flowed well - oil 8 USgal/min, water 0.00 bbl/min, gas 0.00000 Monitor wellbore pressures Flowed well - oil 0 USgal/min, water 0.00 bbl/min, gas 0.00000 Monitor pressures Bullhead well Flowed well - oil 0 USgal/min, water 0.00 bbl/min, gas 0.00000 Monitor pressures Functioned DST equipment Monitor pressures Flowed well - oil 0 USgal/min, water 0.00 bbl/min, gas 0.00000 Monitor pressures Flowed well - oil 0 USgal/min, water 0.00 bbl/min, gas 0.00000 Monitor pressures Monitor wellbore pressures Flowed well - oil 47 USgal/min, water 0.00 bbl/min, gas 0.00000 mmsc Flowed well - oil 0 USgal/min, water 0.00 bbl/min, gas 0.00000 (cont...) Monitor pressures Monitor pressures (cont...) Tested Lubricator Rigged up Slickline unit Functioned DST equipment Conducted slickline operations on Slickline equipment - Tool run Conducted slickline operations on Slickline equipment - Tool run (cont... Monitor pressures Retrieved Toolstring Rigged down Slickline unit Flowed well - oil 0 USgal/min, water 0.00 bbl/min, gas 0.00000 Functioned DST equipment Bleed down well Bullhead well Tested High pressure lines Monitor pressures Functioned DST equipment Serviced Sand traps Bullhead well Monitor pressures Flow check Flow check (cont...) Held safety meeting Bullhead well Bullhead well Bleed down well Flow check Circulated at 11250.0 ft Flow check Circulated at 11250.0 ft Facility Date/Time 06 Jun 98 07 Jun 98 08 Jun 98 09 Jun 98 PB Z Pad Progress Report Well Z-38 Page 10 Rig (null) Date 21 July 98 Duration Activity 18:15-19:15 19:15-19:45 19:45-21:30 21:30-22:15 22:15-22:30 22:30-23:45 23:45-00:00 00:00-00:15 00:15-06:00 06:00-13:00 13:00-13:30 13:30-14:00 14:00-15:00 15:00-16:30 16:30-18:00 18:00-18:30 18:30-18:45 18:45-19:00 19:00-22:00 22:00-22:15 22:15-22:30 22:30-22:45 22:45-23:00 23:00-23:15 23:15-01:15 01:15-01:30 01:30-01:45 01:45-02:00 02:00-03:00 03:00-03:15 03:15-03:30 03:30-03:40 03:40-03:50 03:50-04:00 04:00-04:15 04:15-06:00 06:00-11:45 11:45-12:00 12:00-13:45 13:45-14:00 14:00-15:00 15:00-18:00 18:00-19:00 19:00-20:30 20:30-21:30 21:30-21:45 21:45-22:00 22:00-23:00 23:00-00:15 00:15-06:00 06:00-17:30 17:30-18:30 18:30-06:00 06:00-14:00 lhr 1/2 hr 1-3/4 hr 3/4 hr 1/4 hr 1-1/4 hr 1/4 hr 1/4 hr 5-3/4 hr 7 hr 1/2 hr 1/2 hr 1 hr 1-1/2 hr 1-1/2 hr 1/2 hr 1/4 hr 1/4 hr 3hr 1/4 hr 1/4hr 1/4 hr 1/4 hr 1/4 hr 2 hr 1/4 hr 1/4 hr 1/4 hr lhr 1/4 hr 1/4hr 0hr 0hr 0 hr 1/4 hr 1-3/4 hr 5-3/4 hr 1/4 hr 1-3/4 hr 1/4 hr 1 hr 3hr 1 hr 1-1/2 hr lhr 1/4 hr 1/4 hr 1 hr 1-1/4 hr 5-3/4 hr 11-1/2 hr 1 hr 11-1/2 hr 8hr Flow check Laid down 0.0 ft of Tubing Circulated at 11250.0 ft Flow check Circulated at 11250.0 ft Laid down 492.0 ft of Tubing Held safety meeting Serviced Tubing handling equipment Laid down Tubing of 5300.0 ft Laid down 5300.0 ft of Tubing (cont...) Laid down DST tools - DST downhole equipment Laid down 120.0 ft of Drill collar Rigged up Top ram Made up BHA no. 14 R.I.H. to 3700.0 ft Installed DST downhole equipment Installed BOP test plug assembly Tested BOP stack Tested BOP stack Retrieved BOP test plug assembly Tested Packer assembly Installed BOP test plug assembly Tested Top ram Tested Blind ram Tested BOP stack Tested Annular preventor Tested Bottom ram Tested Top ram Serviced Top ram Tested Top ram Retrieved BOP test plug assembly Tested Top ram Tested Bottom ram Tested Annular preventor Tested Top ram Serviced Top ram Serviced Top ram (cont...) Tested BOP stack Tested All functions Retrieved BOP test plug assembly Removed DST downhole equipment R.I.H. to 10900.0 ft Singled in drill pipe to 11580.0 ft Circulated at 11580.0 ft Washed to 11661.0 ft Reamed to 11685.0 ft Washed to 11729.0 ft Circulated at 11729.0 ft Took Cluster shot survey at 11686.0 ft Drilled to 11850.0 ft Drilled to 13280.0 ft (cont...) Took Cluster shot survey at 12231.0 ft Drilled to 12900.0 ft Drilled to 13263.0 ft (cont...) Progress Report Facility PB Z Pad Well Z-38 Rig (null) Page 11 Date 21 July 98 Date/Time 10 Jun 98 11 Jun 98 12 Jun 98 13 Jun 98 14 Jun 98 14:00-15:45 15:45-16:15 16:15-16:30 16:30-18:30 18:30-18:45 18:45-21:00 21:00-21:50 21:50-22:05 22:05-23:00 23:00-03:00 03:00-03:40 03:40-04:30 04:30-05:30 05:30-06:00 06:00-11:00 11:00-12:00 12:00-14:30 14:30-20:00 20:00-20:30 20:30-21:30 21:30-23:00 23:00-02:00 02:00-06:00 06:00-06:30 06:30-07:00 07:00-13:30 13:30-14:00 14:00-16:00 16:00-16:30 16:30-17:00 17:00-20:30 20:30-21:00 21:00-00:30 00:30-01:30 01:30-04:00 04:00-06:00 06:00-17:00 17:00-17:30 17:30-19:00 19:00-06:00 06:00-00:00 00:00-00:15 00:15-03:30 03:30-06:00 06:00-07:30 07:30-08:30 08:30-09:30 09:30-10:30 10:30-13:30 13:30-14:30 14:30-16:00 16:00-16:30 16:30-20:00 20:00-20:30 Duration 1-3/4 hr 1/2 hr 1/4hr 2 hr 1/4 hr 2-1/4 hr 3/4 hr 1/4 hr 3/4 hr 4 hr 1/2 hr 3/4 hr 1 hr 1/2 hr 5 hr 1 hr 2-1/2 hr 5-1/2 hr 1/2 hr lhr 1-1/2 hr 3 hr 4hr 1/2 hr 1/2hr 6-1/2 hr 1/2 hr 2 hr 1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 3-1/2 hr 1 hr 2-1/2 hr 2 hr llhr 1/2 hr 1-1/2 hr llhr 18hr 1/4 hr 3-1/4 hr 2-1/2 hr 1-1/2 hr 1 hr lhr 1 hr 3 hr 1 hr 1-1/2 hr 1/2 hr 3-1/2 hr 1/2 hr Activity Functioned Circulating sub Circulated at 13066.0 ft Circulated at 13066.0 ft Circulated at 13066.0 ft Rest hole at 13066.0 ft Circulated at 13066.0 ft Circulated at 13066.0 ft Rest hole at 13066.0 ft Pulled out o£ hole to 12285.0 £t Circulated at 12116.0 ft Pulled out of hole to 11645.0 ft Circulated at 11476.0 ft R.I.H. to 13263.0 ft Circulated at 13263.0 ft Drilled to 13398.0 ft Circulated at 13398.0 ft Pulled out of hole to 11549.0 ft Circulated at 11500.0 ft Flow check R.I.H. to 13398.0 ft Circulated at 13398.0 ft Pulled out of hole to 10995.0 ft Circulated at 10995.0 ft Circulated at 10995.0 ft Flow check Pulled out of hole to 3834.0 ft Circulated at 3834.0 ft Pulled out of hole to 169.0 ft Pulled BHA Made up BHA no. 15 R.I.H. to 6000.0 ft Serviced Block hne R.I.H. to 13267.0 ft Reamed to 13398.0 ft Circulated at 13398.0 ft Drilled to 13467.0 ft Drilled to 13881.0 ft Flow check Circulated at 13881.0 ft Drilled to 14375.0 ft Drilled to 15121.0 ft Flow check Drilled to 15311.0 ft Circulated at 15311.0 ft Circulated at 15311.0 ft Rest hole at 15311.0 ft Pulled out of hole to 12884.0 ft R.I.H. to 15311.0 ft Circulated at 15311.0 ft Rest hole at 15311.0 ft Pulled out of hole to 11574.0 ft Rest hole at 11574.0 ft Pulled out of hole to 0.0 ft Installed BOP test plug assembly Progress Report Facility PB Z Pad Well Z-38 Page 12 Rig (null) Date 21 July 98 Date/Time 20:30-22:30 22:30-23:00 23:00-00:30 15 Jun 98 00:30-06:00 06:00-08:00 08:00-09:00 09:00-10:00 10:00-11:00 11:00-06:00 16 Jun 98 06:00-18:30 18:30-21:30 21:30-22:00 22:00-05:00 17 Jun 98 05:00-06:00 06:00-08:00 08:00-08:30 08:30-09:30 09:30-12:00 12:00-13:00 13:00-15:00 15:00-15:30 15:30-18:00 18:00-19:15 19:15-20:30 20:30-02:30 18 Jun 98 02:30-04:30 04:30-05:00 05:00-06:00 06:00-06:00 19 Jun 98 06:00-07:00 07:00-07:30 07:30-22:00 22:00-00:00 20 Jun 98 00:00~01:00 01:00-01:30 01:30-02:15 02:15-04:15 04:15-04:30 06:00-07:00 07:00-07:30 07:30-11:00 11:00-12:30 12:30-21:00 21:00-22:00 22:00-22:30 22:30-00:00 21 Jun 98 00:00-00:15 00:15-06:00 06:00-06:30 06:30-09:00 09:00-13:30 13:30-15:30 15:30-18:30 18:30-20:00 Duration 2 hr 1/2 hr 1-1/2 hr 5-1/2 hr 2 hr 1 hr 1 hr 1 hr 19hr 12-1/2 hr 3 hr 1/2 hr 7 hr lhr 2 hr 1/2 hr 1 hr 2-1/2 hr 1 hr 2 hr 1/2 hr 2-1/2 hr 1-1/4 hr 1-1/4 hr 6 hr 2 hr 1/2 hr 1 hr 24 hr 1 hr 1/2 hr 14-1/2 hr 2hr 1 hr 1/2 hr 3/4 hr 2hr 1/4 hr lhr 1/2 hr 3-1/2 hr 1-1/2 hr 8-1/2 hr lhr 1/2 hr 1-1/2 hr 1/4 hr 5-3/4 hr 1/2 hr 2-1/2 hr 4-1/2 hr 2 hr 3hr 1-1/2 hr Activity Tested BOP stack Installed Wear bushing Made up BHA no. 16 R.I.H. to 11574.0 ft R.I.H. to 15238.0 ft Reamed to 15311.0 ft Drilled to 15331.0 ft Circulated at 15331.0 ft Drilled to 15865.0 ft Drilled to 15.0 ft Circulated at 15933.0 ft Pulled out of hole to 15758.0 ft Drilled to 15790.0 ft Circulated at 15740.0 ft Circulated at 15800.0 ft Flow check Pulled out of hole to 13300.0 ft Circulated at 13400.0 ft Pulled out of hole to 11500.0 ft Pulled out of hole to 9009.0 ft Flow check Pulled out of hole to 175.0 ft Pulled BHA Made up BHA no. 17 R.I.H. to 15758.0 ft Washed to 15933.0 ft Logged hole with LWD: DIR/FE from 15840.0 ft to 15933.0 ft Circulated at 15933.0 ft Drilled to 16493.0 ft Drilled to 16521.0 ft Installed High pressure lines Drilled to 17029.0 ft Circulated at 17029.0 ft Flow check Circulated at 17029.0 ft Flow check Pulled out of hole to 11500.0 ft Flow check R.I.H. to 16985.0 ft Washed to 17029.0 ft Circulated at 17029.0 ft Flow check Pulled out of hole to 243.0 ft Pulled BHA Held safety meeting Test Logging/braided cable equipment unit Held safety meeting R.I.H. to 10230.0 ft R.I.H. to 11289.0 ft Rigged up sub-surface equipment - Cable Conducted electric cable operations Conducted electric cable operations Pulled out of hole to 11317.0 ft Test Logging/braided cable equipment unit Facility Date/Time 22 Jun 98 23 Jun 98 24 Jun 98 25 Jun 98 26 Jun 98 27 Jun 98 PB Z Pad Progress Report Well Z-38 Rig (null) Page Date Duration Activity 20:00-01:00 01:00-04:30 04:30-06:00 06:00-08:30 08:30-13:00 13:00-15:00 15:00-15:30 15:30-19:00 19:00-19:30 19:30-20:30 20:30-21:30 21:30-04:30 04:30-05:30 05:30-06:00 06:00-09:30 09:30-10:30 10:30-14:00 14:00-18:00 18:00-18:30 18:30-20:15 20:15-20:30 20:30-00:00 00:00-00:30 00:30-04:00 04:00-04:30 04:30-06:00 06:00-10:30 10:30-11:00 11:00-15:00 15:00-15:30 15:30-23:00 23:00-23:30 23:30-00:00 00:00-00:30 00:30-03:00 03:00-05:00 05:00-05:30 05:30-06:00 06:00-07:00 07:00-08:00 08:00-13:00 13:00-23:30 23:30-00:00 00:00-06:00 06:00-07:00 07:00-07:30 07:30-12:00 12:00-12:30 12:30-17:00 17:00-01:00 01:00-02:00 02:00-02:30 02:30-03:30 03:30-04:00 5 hr 3-1/2 hr 1-1/2 hr 2-1/2 hr 4-1/2 hr 2 hr 1/2 hr 3-1/2 hr 1/2 hr lhr 1 hr 7 hr lhr 1/2 hr 3-1/2 hr lhr 3-1/2 hr 4hr 1/2 hr 1-3/4 hr 1/4 hr 3-1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 1-1/2 hr 4-1/2 hr 1/2 hr 4hr 1/2 hr 7-1/2 hr 1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 2 hr 1/2 hr 1/2 hr lhr 1 hr 5 hr 10-1/2 hr 1/2 hr 6hr 1 hr 1/2 hr 4-1/2 hr 1/2 hr 4-1/2 hr 8 hr 1 hr 1/2 hr 1 hr 1/2 hr R.I.H. to 17013.0 ft Conducted electric cable operations Pulled out of hole to 11317.0 ft Conducted electric cable operations Pulled out of hole to 105.0 ft Functioned Formation logs Installed BOP test plug assembly Tested BOP stack Installed Wear bushing Serviced Block line Rigged up Casing handling equipment Ran Liner to 5756.0 ft (4-1/2in OD) Installed Liner hanger Circulated at 5756.0 ft Ran Drillpipe in stands to 11574.0 ft Circulated at 11574.0 ft Ran Drillpipe in stands to 17029.0 ft Circulated at 17029.0 ft Rigged up Cement pump Mixed and pumped slurry - 167.000 bbl Functioned Liner hanger Circulated at 11247.0 ft Rigged down High pressure lines Pulled Drillpipe in stands to 0.0 ft Installed Drillstring handling equipment R.I.H. to 1400.0 ft Singled in drill pipe to 5795.1 ft Circulated at 5795.0 ft Pulled out of hole to 5795.0 ft Made up BHA no. 18 R.I.H. to 11000.0 ft Held drill (Kick (well kill)) R.I.H. to 11237.0 ft Held drill (Kick (well kill)) R.I.H. to 16732.0 ft Circulated at 16732.0 ft Tested Liner Washed to 16830.0 ft Washed to 16935.0 ft (cont...) Drilled installed equipment - Landing collar Circulated at 16955.0 ft Pulled out of hole to 20.0 ft Pulled BHA Serviced Gun assembly Rigged up sub-surface equipment - Gun assembly Held safety meeting Installed Gun assembly Held safety meeting Installed Gun assembly Ran Drillpipe in stands to 11165.0 ft Space out tubulars Functioned Retrievable packer Serviced High pressure lines Perforated 13 21 July 98 Progress Report Facility PB Z Pad Well Z-38 Page 14 Rig (null) Date 21 July 98 Date/Time 28 Jun 98 29 Jun 98 30 Jun 98 04:00-05:00 05:00-05:15 05:15-06:00 06:00-07:00 07:00-10:00 10:00-10:30 10:30-13:30 13:30-14:00 14:00-21:00 21:00-22:00 22:00-00:30 00:30-01:00 01:00-06:00 06:00-13:00 13:00-14:00 14:00-18:00 18:00-19:00 19:00-20:00 20:00-21:00 21:00-21:30 21:30-22:00 22:00-05:00 05:00-06:00 06:00-09:00 09:00-10:30 10:30-11:00 11:00-12:00 12:00-13:00 13:00-17:00 17:00-18:00 18:00-19:30 19:30-22:00 22:00-00:00 00:00-01:30 01:30-03:00 03:00-06:00 06:00-08:00 08:00-09:30 Duration 1 hr 1/4 hr 3/4 hr 1 hr 3hr 1/2 hr 3 hr 1/2 hr 7hr 1 hr 2-1/2 hr 1/2 hr 5hr 7 hr 1 hr 4 hr lhr 1 hr 1 hr 1/2 hr 1/2 hr 7 hr 1 hr 3 hr 1-1/2 hr 1/2 hr 1 hr 1 hr 4 hr 1 hr 1-1/2 hr 2-1/2 hr 2 hr 1-1/2 hr 1-1/2 hr 3 hr 2 hr 1-1/2 hr Activity Reverse circulated at 11156.0 ft Packer worked at 11156.0 ft Circulated at 11156.0 ft Laid down 472.0 ft of 3-1/2in OD drill pipe Circulated at 10716.0 ft Flow check Circulated at 10716.0 ft Flow check Laid down 11149.0 ft of 3-1/2in OD drill pipe Rigged down sub-surface equipment - Retrievable packer Laid down 1287.0 ft of Tubing Held safety meeting Rigged down sub-surface equipment - Gun assembly Rigged down sub-surface equipment - Gun assembly (cont...) Ran Drillpipe in stands to 4982.0 ft Laid down 4982.0 ft of 3-1/2in OD drill pipe Rigged up Top ram Tested Top ram Serviced Block line Held safety meeting Rigged up sub-surface equipment - Production packer Ran Tubing to 9060.0 ft (4-1/2in OD) Rigged up sub-surface equipment - SCSSSV control line Ran Tubing to 11235.0 ft (4-1/2in OD) Space out tubulars Tested Dual control line Circulated at 11235.0 ft Set packer at 11179.0 ft with 3500.0 psi Investigated pressure change Tested Tubing Tested Casing Installed BOP stack Removed BOP stack Installed Tubing on landing string Freeze protect well - 80.000 bbl of Diesel Freeze protect well - Diesel of 80.000 bbl Freeze protect well - 80.000 bbl of Diesel (cont...) Installed Lubricator ANADRILL SCHLUMBERGER Survey report Client ................... : BP Exploration Field .................... : Prudhoe Bay Well ..................... : Z-38 API number ............... : 50-029-22873 Engineer ................. : Mark St Amour I'~IG: ..................... : NABORS 18-E STATE: ................... : Alaska Survey calculation methods Method for positions ..... : Minimum curvature Method for DLS ........... : Mason & Taylor Depth reference - Permanent datum .......... : MSL Depth reference .......... : Driller's GL above permanent ....... : 54.80 ft KB above permanent ....... : 84.20 ft DF above permanent ....... : 83.70 ft Vertical section origin Latitude (+N/S-) ......... : Departure (+E/W-) ........ : 0.00 ft 0.00 ft Platform reference point-- 'Latitude (+N/S-) ......... : -999.25 ft Departure (+E/W-) ........ : -999.25 ft Azimuth from rotary table to target: 285.00 degrees RECEIVED 3 UL 0 t 1998 BPXA PDC 20-Jun-98 04:56:47 Page 1 of 10 Spud date ................ : 14-APR-98 Last survey date ......... .. Total accepted surveys...: 259 MD of first survey ....... : 3204.84 f MD of last survey ........ : 16968.65 ft Geomagnetic data Magnetic model ........... : BGGM version 1997 Magnetic date ............ : 17-Jun-1998 Magnetic field strength.,: 1145.93 HCNT Magnetic dec (+E/W-) ..... : 27.85 degrees Magnetic dip ............. : 80.66 degrees MWD survey Reference Criteria Reference G .............. : 1002.68 mGal Reference H .............. : 1145.00 HCNT Reference Dip ............ : 80.66 degrees Tolerance of G ........... : (+/-) 3.00 mGal Tolerance of H ........... : (+/-) 7.00 HCNT Tolerance of Dip ......... : (+/-) 0.30 degrees Corrections Magnetic dec (+E/W-) ..... : 27.88 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-) .... : 27.88 degrees (Total az corr= magnetic dec - grid cony) Sag applied (Y/N) ........ : No degree: 0.00 L [(c) 1998 Anadrill IDEAL ID5 iA 12R] ANADRILL SCHLUMBERGER Survey Report 20-Jun-98 04:56:47 Page 2 of 10 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 1 3204.84 22.06 281.7 2 3229.39 23.35 282.6 3 3260.01 24.38 282.9 4 3291.78 24.23 280.4 5 3323.51 24.20 276.0 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 " 22 23 24 25 0.00 24.60 30.60 31.80 31.70 3385.72 25.91 271.3 62.20 3478.77 26.77 266.5 93.10 3511.00 27.19 269.0 32.20 3604.36 30.32 272.0 93.40 3697.12 33.43 275.9 92.70 3791.27 36.79 278.8 94.20 3884.59 42.01 280.7 93.30 3977.39 46.72 281.0 92.80 4070.01 49.44 285.9 92.60 4161.50 53.84 286.7 91.50 4232.47 54.31 286.2 71.00 4320.24 51.82 287.2 87.70 4414.43 52.16 285.7 94.20 4506.67 52.91 283.9 92.30 4600.80 51.90 285.0 94.10 4695.68 52.75 284.2 94.90 4789.54 54.25 286.4 93.80 4882.16 54.05 286.3 92.70 4973.54 53.53 287.7 91.30 5068.21 53.75 288.1 94.70 26 5160.34 54.52 286.9 27 5251.84 54.78 286.9 28 5344.96 55.07 284.8 29 5435.38 54.78 284.4 30 5470.30 55.10 283.7 92.10 91.50 93.20 90.40 34.90 TVD depth (ft) 3172.19 3194.88 3222.87 3251.85 3280.76 3337.11 3420.56 3449.25 3531.13 3609.85 3686.90 3758.98 3825.30 3887.18 3943.95 3985.61 4038.31 4096.32 4152.46 4209.87 4267.87 4323.67 4377.96 4431.90 4488.04 4542.00 4594.94 4648.50 4700.45 4720.50 Vertical Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) 100f) type type 298.10 77.55 307.59 79.55 319.96 82.28 333.02 84.93 345.92 86.78 371.72 88.42 411.37 87.60 425.32 87.03 468.82 87.48 516.85 90.92 570.53 97.91 629.48 107.99 694.18 120.21 763.01 136.28 834.72 156.43 892.20 172 962.26 192 1036.46 213 1109.71 232 1184.26 251 1259.37 1334.76 1409.88 1483.50 1559.66 1634.23 1708.82 1785.08 1859.06 1887.62 -287.84 -297.12 -309.20 -322.01 -334.87 -361.14 -402.41 -417.01 -461.92 -510.72 298.10 285.08 0.00 TIP 307.59 284.99 5.43 MWD M -- 319.96 284.90 3.39 MWD M -- 333.02 284.77 3.27 MWD M 345.93 284.53 5.69 MWD M -- 371.81 411.84 425.99 470.13 518.75 283.76 4.22 MWD M -- 282.28 2.47 MWD M -- 281.79 3.76 MWD M -- 280.72 3.69 MWD M 280.09 4.02 MWD M -564.42 572.85 279.84 3.98 MWD M -- -622.75 632.05 279.84 5.74 MWD M -686.46 696.91 279.93 5.08 MWD M -753.41 765.64 280.25 4.91 MWD M -- -822.25 837.00 280.77 4.86 MWD M -- .71 -877.40 .84 -944.54 .86 -1015.72 .56 -1086.54 .16 -1158.74 270.09 -1231.43 290.00 -1304.14 311.15 -1376.24 332.69 -1446.69 356.13 -1519.26 378.57 -1590.44 400.26 -1661.85 421.09 -1735.22 439.74 -1806.81 446.67 -1834.52 894.23 964.02 1037.98 1111.15 1185.65 281.14 0.87 MWD M 281.54 2.98 MWD M -- 281.89 1.31 MWD M -- 282 · 08 1.75 MWD M -- 282.23 1.42 MWD M -- 1260.70 282.37 1.12 MWD M -- 1336.00 282.54 2.47 MWD M -- 1410.98 282.74 0.23 MWD M -- 1484.45 282.95 1.36 MWD M -- 1560.44 283.19 0.41 MWD M -- 1634.87 1709.37 1785.58 1859.55 1888.12 283.39 1.35 283.54 0.28 283.64 1.87 283.68 0.48 283.68 1.88 MWD M [ (c)1998 Anadrill IDEAL ID5 IA 12R] -- -- ANADRILL SCHLUMBERGER Survey Report 20-Jun-98 04:56:47 Page 3 of 10 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 31 5564,26 54,88 283,4 32 5655,98 55,15 283,5 33 5749,54 54,61 282,5 34 5842,45 54,12 282,7 35 5936,02 53,70 281,8 36 6030,95 53,30 280,9 '~. 37 6124,64 53,06 280,0 38 6217,72 52,80 279,9 39 6311,88 54,01 280,7 40 6403,67 54,12 280,7 41 6498,63 55,16 283,3 42 6591,51 55,00 282,9 43 6685,29 54,68 281,9 44 6780,95 55,08 282,5 45 6875,65 55,10 281,9 46 6970.25 54.79 282.0 47 7063.21 54.76 282.9 48 7154.78 54.41 283.6 49 7247.92 54.30 285.0 50 7342.57 53.87 285.5 51 7437,52 53.62 286.3 52 7530.33 53,26 285,8 53 7624,94 52,84 285,1 54 7719,49 52,33 285.1 55 7811,63 51.96 284,6 56 7905.00 51.60 284.5 57 7998.97 50.79 284.4 58 8091.75 50.20 283.4 59 8185.32 51.15 283.2 60 8277.69 52.27 283.9 TVD Vertical Displ Displ Total At DLS depth section +N/S- +E/W- displ Azim (deg/ (ft) (ft) (ft) (ft) (ft) (deg) 100f) 94,00 4774,43 1964,59 464,71 91,70 4827,00 2039,69 482,19 93,50 4880,79 2116,12 499,39 93,00 4934,98 2191,64 515,88 93,50 4990,06 2267,10 531,91 95,00 5046,56 2343,31 546,94 93,60 5102,66 2418,01 560,53 93,10 5158,78 2492,00 573,37 94,20 5214,94 2567,38 586,90 91,80 5268,81 2641,50 600,70 94,90 5323,74 2718,77 616,80 92,90 5376,92 2794,90 634,06 93,80 5430,93 2871,51 650,53 95,70 5485,99 2949,69 667,07 94,60 5540,13 3027,18 683,47 94,70 5594,52 3104.59 699.52 92,90 5648,10 3180,40 715,88 91,60 5701,19 3255,02 732,99 93,10 5755,44 3330.67 751,67 94,70 5810,99 3407,36 771,85 94,90 5867,11 3483,88 792,81 92,80 5922,39 3558,40 813.42 94,60 5979,26 3634,00 833,56 94,60 6036,74 3709,14 853,13 92,10 6093.25 3781.86 871.77 93,40 6151,04 3855,23 890,2 94.00 6209.95 3928.48 908,4 92,80 6268,98 4000,07 925,6 93,50 6328,23 4072,36 942,3 92.40 6385,49 4144,86 959,3 -1909,37 -1982,44 -2056,95 -2130,72 -2204,55 -2279,42 -2353,11 -2426,28 -2500,68 -2573,72 -2649.41 -2723.60 -2798.50 -2875.01 -2950.83 -3026,67 -3100,77 -3173,44 -3246,75 -3320,74 -3394,34 -3465,98 -3538,84 -3611,39 -3681.67 1 -3752.70 8 -3823,63 9 -3893,14 3 -3963,52 2 -4034,03 1965,11 2040,24 2116,71 2192,28 2267,82 Srvy tool type 283,68 0,35 MWD M 283,67 0,31 MWD M -- 283,65 1,05 MWD M 283,61 0,56 MWD M 283,57 0,90 MWD M -- 2344.13 283.49 0.87 MWD M 2418.95 283.40 0.81 MWD M -- 2493.10 283.30 0.29 MWD M 2568.63 283.21 1.45 MWD M -- 2642.89 283.14 0.12 MWD M -- 2720,26 283.11 2,49 2796,43 283,11 0,39 2873,11 283,09 0,94 2951,38 283,06 0,66 3028.95 283.04 0,52 MWD M 3106,45 3182,34 3256,99 3332,62 3409,26 283,01 0,34 MWD M -- 283,00 0.79 MWD M -- 283,01 0,73 MWD M -- 283,04 1,23 MWD M 283,09 0,62 MWD M -- 3485,70 283,15 0,73 3560,15 283,21 0.58 3635,69 283,25 0,74 3710,79 283,29 0,54 3783,48 283.32 0,59 3856,84 3930,08 4001,68 4074,00 4146,52 MWD M 283.34 0,39 MWD M 283,37 0.87 MWD M -- 283,38 1,05 MWD M -- 283,37 1,03 MWD M -- 283,38 1.35 MWD M Tool qual type [(c)1998 Anadrill IDEAL ID5 iA 12R] -- -- ANADRILL SCHLUMBERGER Survey Report 20-Jun-98 04:56:47 Page 4 of 10 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 61 8369.03 53.56 283.8 62 8461.74 53,73 284.2 63 8558.01 53.39 284.6 64 8651.30 52.81 284.1 65 8745.76 53.70 283.9 66 8838.91 53.88 285.2 67 8934.20 54.90 286.7 68 9030.00 55.30 286.3 69 9123.07 54.23 286.2 70 9217.02 54.30 286.2 71 9311.40 53.09 286.5 72 9373.42 52.46 286.1 73 9437.17 50.56 285.5 74 9498.66 48.90 285.6 75 9561.08 47.55 285.5 76 9623.70 45.70 286.2 77 9686.36 43.37 285.4 78 9776.69 37.50 285.3 79 9870.28 35.83 284.4 80 9964.35 37.05 285.1 81 10059.43 37.40 285.3 82 10153.65 37.16 286.0 83 10246.92 37.47 284.5 84 10341.30 37.76 284.3 85 10434.24 36.86 284.9 86 10527.56 36.59 284.5 87 10622.25 37.11 283.7 88 10716.41 37.76 283.2 89 10809.20 37.67 283.1 90 10902.04 37.12 282.6 91.30 92.70 96.30 93.30 94.50 93.10 95.30 95.80 93.10 93.90 94.40 62.00 63.80 61.50 62.40 62.60 62.70 90.30 93.60 94.00 95.10 94.30 93.20 94.40 92.90 93.40 94.60 94.20 92.80 92.80 TVD depth (ft) 6440.54 6495.49 6552.69 6608.71 6665.25 6720.25 6775.74 6830.55 6884.26 6939.10 6994.99 7032.50 7072.21 7111.96 7153.53 7196.52 7241.21 7309.91 7384.99 7460.61 7536.33 7611.37 7685.49 7760.27 7834.16 7909.02 7984.72 8059.52 8132.93 8206.66 Vertical Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) 100f) type type 4217.68 976.75 4292.32 994.82 4369.79 1014.08 4444.40 1032.57 4520.11 1050.89 4595.22 1069.76 4672.68 1091.06 4751.23 1113.37 4827.25 1134.65 4903.46 1155.92 4979.51 1177.33 5028.86 1191.19 5078.79 1204.79 5125.71 1217.37 5172.25 1229.84 5217.74 1242.27 5261.71 1254.24 5320.25 1269.74 5376.14 1284.08 5431.97 1298.30 5489.50 1313.38 5546.61 1328.79 5603.11 1343.64 5660.72 1357.97 5717.03 1372.16 5772.88 1386.34 5829.60 1400.16 5886.84 1413.47 5943.58 1426.39 5999.90 1438.92 -4104.74 -4177.18 -4252.22 -4324.50 -4397.97 -4470.68 -4545.17 -4620.50 -4693.51 -4766.70 -4839.70 -4887.08 -4935.13 -4980.34 -5025.17 -5068.94 -5111.25 -5167.70 -5221.72 -5275.71 -5331.23 -5386.23 -5440.73 -5496.54 -5551.03 -5605.05 -5660.08 -5715.77 -5771.05 -5825.99 4219.35 4294.01 4371.47 4446.07 4521.79 4596.89 4674.29 4752.75 4828.71 4904.86 283.39 1.42 283.40 0.39 283.41 0.49 283.43 0.76 283.44 0.96 MWD M 283.46 1.14 MWD M 283.50 1.67 MWD M -- 283.55 0.54 MWD M -- 283.59 1.15 MWD M -- 283.63 0.07 MWD M 4980.84 283.67 1.31 MWD M -- 5030.16 283.70 1.14 MWD M 5080.06 283.72 3.07 MWD M -- 5126.96 283.74 2.70 MWD M -- 5173.47 283.75 2.17 MWD M -- 5218.94 283.77 3.06 MWD M -- 5262.89 283.79 3.82 MWD M 5321.41 283.80 6.50 MWD M 5377.29 283.82 1.87 MWD M -- 5433.11 283.83 1.37 MWD M -- 283.84 0.39 MWD M 283.86 0.52 MWD M -- 283.87 1.03 MWD M 283.88 0.33 MWD M -- 283.88 1.04 MWD M 5490.62 5547.71 5604.19 5661.81 5718.11 5773.95 283.89 0.39 MWD M -- 5830.69 283.89 0.75 MWD M -- 5887.94 283.89 0.76 MWD M -- 5944.71 283.88 0.12 MWD M 6001.06 283.87 0.68 MWD M -- [ (c) 1998 Anadrill IDEAL ID5 iA 12R] -- ANADRILL SCHLUMBERGER Survey Report 20-Jun-98 04:56:47 Page 5 of 10 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) TVD depth (ft) 91 10995.54 36.36 284.0 93.50 8281.58 92 11088.46 35.65 284.5 93.00 8356.82 93 11183.09 35.61 284.2 94.60 8433.71 94 11278.52 35.33 283.6 95.40 8511.40 95 11370.38 35.46 283.6 91.90 8586.32 96 11463.97 34.95 284.0 93.60 8662.80 "~ 97 11559.53 35.33 284.2 95.50 8740.89 98 11624.37 38.05 284.3 64.90 8792.93 99 11657.73 41.48 284.4 33.30 8818.52 100 11688.06 43.86 287.2 30.40 8840.88 101 11720.00 42.52 287.1 31.90 102 11751.71 45.41 285.6 31.70 103 11783.38 49.40 285.3 31.70 104 11815.44 53.36 285.8 32.00 105 11847.11 57.64 286.1 31.70 106 11879.20 60.99 288.1 32.10 107 11911.06 64.84 288.5 31.90 108 11942.73 68.94 288.8 31.60 109 11974.52 73.11 289.0 31.80 110 12006.95 77.32 287.4 32.40 111 12038 · 64 81.64 288 · 0 31.70 112 12070.02 85.95 288.5 31.40 113 12102.38 89.86 290.2 32.40 114 12134.05 92.26 294.7 31.70 115 12166.31 94 · 15 300.1 32 · 20 116 12197.93 93.94 301.6 31.60 117 12230.43 93.53 302.0 32.50 118 12261,56 92.74 302.8 31.20 119 12293.43 92.81 305.1 31.80 120 12325.62 93.63 305.9 32.20 8864.13 8886.95 8908.40 8928.37 8946.32 8962.70 8977.22 8989.62 8999.96 9008.22 9014.01 9017.40 9018.59 9018.00 9016.20 9013.97 9011.85 9010.15 9008.61 9006.80 Vertical Displ section +N/S- (ft) (ft) 6055.80 1451 6110.46 1465 6165.57 1478 6220.92 1492 6274.13 1504 6328.08 1517 6383.04 1530 6421.81 1540 6443.11 1545 6463.70 1551 6485.52 1557 6507.52 1564 6530.85 1570 6555.84 1576 6581.96 1584 6609.54 6637.89 6666.89 6696.88 6728.15 6759.28 6790.44 6822.71 6854.13 6885.52 6915.84 6946.88 6976.61 7006.65 7036.76 Displ Total At DLS Srvy Tool +E/W- displ Azim (deg/ tool qual (ft) (ft) (deg) 100f) type type .78 -5880.42 .24 -5933.41 .90 -5986.80 .20 -6040.54 .71 -6092.27 .58 -6144.68 .97 -6197.99 .52 -6235.57 .80 -6256.20 .42 -6276.02 .85 -6296.88 .04 -6317.99 .26 -6340.48 .96 -6364.56 .14 -6389.67 6056.98 283.87 1.21 6111.65 283.87 0.83 6166.76 283.88 0.19 6222.11 283.88 0.47 6275.34 283.87 0.14 6329.30 283.87 0.60 MWD M 6384.27 283.87 0.42 MWD M -- 6423.04 283.88 4.19 MWD M -- 6444.34 283.88 10.30 MWD M -- 6464.93 283.89 10.01 MWD M 6486.72 283.90 4.21 MWD M 6508.71 283.90 9.69 MWD M -- 6532.03 283.91 12.61 MWD M -- 6557.02 283.92 12.43 MWD M 6583.12 283.92 13.52 MC 1592.26 -6416.05 6610.67 283.94 11.73 1601.18 -6443.01 6638.99 283.96 12.12 1610.47 -6470.54 6667.95 283.98 13.00 1620.21 -6498.99 6697.90 284.00 13.13 1629.99 -6528.74 6729.14 284.02 13.84 1639.46 -6558.42 6760.23 284.04 13.75 1649.24 -6588.06 6791.36 284.05 13.82 1659.97 -6618.61 6823.59 284.08 13.16 1672.06 -6647.89 6854.94 284.12 16.09 1686.85 -6676.42 6886.22 284.18 17.74 6916.42 6947.35 6976.98 7006.92 7036.94 284.25 4.78 284.34 1.76 284.41 3.60 284.50 7.23 284.60 3.56 1703.02 -6703.48 1720.11 -6731.04 1736.80 -6757.35 1754.53 -6783.69 1773.20 -6809.86 MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor [ (c)1998 Anadrill IDEAL ID5 IA 12R] ANADRILL SCHLUMBERGER Survey Report Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 121 12357.14 95.84 307.1 31.50 122 12389.12 96.91 309.6 32.00 123 12420.96 96.18 308.7 31.90 124 12452.41 95,77 309.2 31.40 125 12484.45 95.60 309.3 32.10 126 12515.76 95.39 309.7 31.30 127 12547.23 95.08 310.7 31.40 128 12579.38 94.39 310.0 32.20 129 12610.73 94.22 309.9 31.30 130 12642.96 94.12 309.7 32.30 131 12674.84 93.87 310.0 31.80 132 12706.14 93.57 310.4 31.30 133 12738.19 93.29 310.4 32.10 134 12769.26 92.88 310.4 31.10 135 12800.78 92.57 310.8 31.50 136 12832.60 92.60 311.2 31.80 137 12864.84 91.99 310.4 32.20 138 12896.66 93.05 310.4 31.90 139 12928.62 93.29 310.0 31.90 140 12960.84 93.09 309.9 32.20 141 12992.72 93.67 309.8 31.90 ,142 13025.26 95.01 310.7 32.60 143 13057.11 94.98 310.4 31.80 144 13121.21 95.29 311.1 64.10 145 13153.29 94.98 311.7 32.10 146 13185.34 95.01 310.9 32.00 147 13213.71 95.16 311.2 28.40 148 13245.28 94.56 310.6 31.60 149 13277.39 94.81 309.5 32.10 150 13309.09 93.36 310.0 31.70 TVD depth (ft) 9004.20 9000.64 8997.01 8993.74 8990.56 8987.56 8984.70 8982.04 8979.69 8977.34 8975.13 8973.10 8971.17 8969.50 8968.00 8966.57 8965.28 8963.88 8962.11 8960.32 8958.44 8955.97 8953.21 8947.47 8944.59 8941.81 8939.29 8936.61 8933.99 8931.73 20-Jun-98 04:56:47 Page 6 of 10 Vertical Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) 100f) type type 7065.97 1791.87 7095.16 1811.60 7124.08 1831.61 7152.62 1851.24 7181.75 1871.45 7210.10 1891.27 7238.39 1911.46 7267.39 1932.23 7295.69 1952.27 7324.93 1972.89 7353.72 1993.22 7381.98 2013.38 7410.92 2034.15 7438.98 2054.28 7467.35 2074.75 7495.90 2095.59 7524.87 2116.62 7553.66 2137.27 7582.48 2157.83 7611.63 2178.47 7640.52 2198.88 7669.92 2219.88 7698.51 2240.48 7756.01 2282.15 7784.65 2303.29 -6835.10 -6860.04 -6884.61 -6908.90 -6933.64 -6957.68 -6981.56 -7006.02 -7029.94 -7054.69 -7079.05 -7102.90 -7127.30 -7150.95 -7174.84 -7198.82 -7223.17 -7247.44 -7271.77 -7296.42 -7320.87 -7345.67 -7369.75 -7418.11 -7442.09 -7466.04 -7487.37 -7511.17 -7535.66 -7559.97 7813.22 2324.33 7838.64 2342.91 7866.96 2363.53 7895.94 2384.11 7924.66 2404.33 7066.07 7095.21 7124.09 7152.62 7181.76 284.69 7.98 284.79 8.45 284.90 3.62 285.00 2.05 285.10 0.61 7210.14 285.21 1.44 7238.50 285.31 3.32 7267.58 285.42 3.05 7295.99 285.52 0.63 7325.37 285.62 0.69 7354.31 285.73 1.23 7382.75 285.83 1.60 7411.90 285.93 0.87 7440.17 286.03 1.32 7468.80 286.13 1.61 7497.63 7526.91 7556.02 7585.18 7614.69 286.23 1.26 286.33 3.12 286.43 3.32 286.53 1.46 286.62 0.69 7643.96 7673.77 7702.78 7761.22 7790.37 286.72 1.84 286.81 4.95 286.91 0.94 287.10 1.19 287.20 2.10 7819.48 287.29 2.49 7845.38 287.38 1.18 7874.26 287.47 2.68 7903.81 287.56 3.50 7933.09 287.64 4.84 MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC MC magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor magcor [(c) 1998 Anadrill IDEAL ID5 IA 12R] -- -- ANADRILL SCHLUMBERGER Survey Report 20-Jun-98 04:56:47 Page 7 of 10 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 151 13344.31 88.35 310.7 152 13378.52 86.70 311.2 153 13410.33 86.53 311.4 154 13442.37 86.26 310.6 155 13474.08 86.02 310.4 156 13506.00 86.40 310.9 ~157 13538 47 87 70 309 0 158 13569.04 87.84 309.4 159 13600.80 87.74 309.6 160 13633.29 87.67 308.7 161 13664.62 87.60 311.2 162 13696.22 87.19 309.9 163 13728.37 88.25 308.9 164 13760.26 88.46 305.7 165 13792.16 88.25 305.4 166 13824.05 87.98 304.1 167 13856.03 87.98 304.4 168 13887.88 87.91 304.2 169 13919.80 87.74 306.7 170 13951.54 87.26 306.2 171 13983.22 87.02 305.2 ~172 14015.27 86.60 304.8 "173 14047.79 87.43 305.1 174 14079.96 88.46 304.7 175 14111.79 88.15 304.5 176 14143.78 87.46 304.5 177 14175.67 88.25 305.1 178 14207.27 88.22 306.5 179 14240.33 87.87 305.6 180 14271.26 88.01 306.3 35.20 34.20 31.80 32.10 31.70 31.90 32.50 30.50 31.80 32.50 31.30 31.60 32.20 31.90 31.90 31.80 32.00 31.90 31.90 31.70 31.70 32.10 32.50 32.20 31.80 32.00 31.90 31.60 33.00 31.00 TVD Vertical Displ Displ Total At depth section +N/S- +E/W- displ Azim (ft) (ft) (ft) (ft) (ft) (deg) 8931.21 8932.69 8934.56 8936.58 8938.72 8940.82 8942.50 8943.68 8944.91 8946.21 8947.50 8948.94 8950.22 8951.14 8952.05 8953.10 8954.23 8955.37 8956.58 8957.96 8959.55 8961.33 8963.03 8964.18 8965.12 7956.46 2427.11 -7586.79 7965.56 287.74 7987.18 2449.50 -7612.59 7996.98 287.84 8015.64 2470.45 -7636.44 8026.11 287.93 8044.43 2491.47 -7660.62 8055.59 288.02 8072.98 2512.01 -7684.67 8084.82 288.10 8101.67 2532.75 -7708.82 8114.23 288.19 8131.10 2553.59 -7733.70 8144.38 288.27 8158.89 2572.85 -7757.32 8172.85 288.35 8187.81 2593.06 -7781.83 8202.50 288.43 8217.44 2613.56 -7807.02 8232.88 288.51 8245.79 2633.64 -7830.99 8261.99 288.59 8274.27 2654.17 -7854.98 8291.28 288.67 8303.57 2674.59 -7879.84 8321.37 288.75 8333.07 2693.91 -7905.20 8351.61 288.82 8362~93 2712.45 -7931.14 8382.15 288.88 8392.84 2730.56 -7957.26 8412.72 288.94 8423.03 2748.56 -7983.69 8443.57 289.00 8453.12 2766.53 -8010.03 8474.33 289.05 8482.99 2785.01 -8035.99 8504.91 289.11 8512.46 2803.83 -8061.47 8535.15 289.18 8542.08 2822.30 8572.20 2840.69 8602.70 2859.28 8632.96 2877.69 8662.91 2895.74 8966.35 8693.05 2913.85 8967.54 8723.04 2932.04 8968.51 8752.57 2950.52 8969.64 8783.35 2969.93 8970.75 8812.28 2988.12 -8087.18 -8113.43 -8140.03 -8166.42 -8192.59 -8218.94 -8245.12 -8270.73 -8297.40 -8322.48 8565.50 8596.35 8627.61 8658.61 8689.29 289.24 289.30 289.35 289.41 289.47 8720.18 8750.93 8781.26 8812.91 8842.65 289.52 289.58 289.63 289.69 289.75 DLS (deg/ 100f) 14.37 5.04 0.82 2.63 0.98 1.97 7.08 1.39 0.70 2.78 7.98 4.31 4.52 10.05 1.15 4.17 0.94 0.66 7.85 2.19 3.24 1.81 2.72 3,43 1,16 2.16 3.11 4.43 2.92 2.30 S rvy tool type MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD Tool qual type 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis [(c)1998 Anadrill IDEAL ID5 iA 12R] -- -- ANADRILL SCHLUMBERGER Survey Report 20-Jun-98 04:56:47 Page 8 of 10 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 181 14303.55 87.19 306.1 182 14335.37 86.78 306.2 183 14366.62 87.36 303.5 184 14398.23 88.11 305.9 185 14430.70 87.60 303.1 186 14463.21 88.05 306.8 187 14494.56 88.15 304.8 188 14526.20 88.56 305.5 189 14556.35 88.83 306.0 190 14588.43 88.18 304.2 191 14620.01 86.84 304.1 192 14652.03 86.60 304.5 193 14684.34 86.36 302.3 194 14748.03 85.64 302.5 195 14779.93 85.68 304.2 196 14811.80 87.02 304.4 197 14843.43 86.64 305.1 198 14875.27 86.60 306.7 199 14907.20 87.29 304.6 200 14939.25 88.97 306.2 201 14971.02 88.80 306.2 202 15001.26 90.55 308.7 203 15033.62 93.53 309.6 204 15065.56 93.64 310.2 205 15097.22 93.33 308.7 206 15129.46 93.02 307.7 207 15160.91 94.43 307.5 208 15192.99 96.18 307.2 209 15223.89 96.53 307.8 210 15253.91 96.49 307.8 32.20 31.90 31.20 31.60 32.50 32.50 31.40 31.60 30.20 32.00 31.60 32.00 32.30 63.70 31.90 31.90 31.60 31.90 31.90 32.00 31.80 30.30 32.30 32.00 31.60 32.30 31.40 32.10 30.90 30.00 TVD depth (ft) 8972.10 8973.78 8975.38 8976.62 8977.84 8979.07 8980.12 8981.02 8981.71 8982.54 8983.92 8985.75 8987.73 8992.18 8994.59 8996.62 8998.37 9000.25 9001.95 9002.99 9003.61 9003.78 9002.63 9000.63 8998.71 8996.92 8994.88 8991.92 8988.50 8985.09 Vertical Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) 100f) type type 8842.27 3007.12 8871.98 3025.91 8901.29 3043,71 8931.01 3061.69 8961.62 3080.08 8992.14 3098.68 9021.48 3117.04 9051.13 3135.22 9079.37 3152.86 9109.41 3171.25 9139.23 3188.98 9169.38 3206.98 9199.97 3224.73 9260.61 3258.77 9290.80 3276.26 9320.84 3294.20 9350.54 3312.18 9380.29 3330.86 9410.09 3349.42 9440.07 3367.95 9469.71 3386.73 9497.71 3405.15 9527.16 3425.52 9556.13 3446.01 9584.84 3466.05 9614.48 3485.99 9643.41 3505.11 9672.97 3524.50 9701.34 3543.20 9728.82 3561.47 -8348.44 -8374.16 -8399.73 -8425.69 -8452.45 -8479.06 -8504.52 -8530.34 -8554.85 -8581.02 -8607.14 -8633.53 -8660.45 -8714.10 -8740.67 -8766.97 -8792.89 -8818.69 -8844.57 -8870.64 -8896.29 -8920.35 -8945.38 -8969.88 -8994.23 -9019.58 -9044.40 -9069.81 -9094.17 -9117.72 8873.51 289.81 2.62 8904.08 289.87 1.32 8934.18 289.92 8.84 8964.72 289.97 7.95 8996.16 290.02 8.75 9027 9057 9088 9117 9148 .53 290.07 11.46 .74 290.13 6.37 .25 290.18 2.57 .34 290.23 1.88 .26 290.28 5.98 9178 9209 9241 9303 9334 .92 .92 .33 .50 .52 MWD MWD MWD MWD MWD 9365 9396 9426 9457 9488 MWD MWD MWD MWD MWD 9519 9548 9578 9609 9638 290.33 4.25 MWD 290.38 1.46 MWD 290.42 6.84 MWD 290.50 1.17 MWD 290.55 5.32 MWD .44 290.59 4.25 .04 290.64 2.52 .76 290.69 5.01 .54 290.74 6.92 .48 290.79 7.25 .14 290.84 0.53 .17 290.89 10.07 .83 290.95 9.64 .04 291.02 1.90 .97 291.07 4.84 9669.79 291.13 3.24 9699.85 291.18 4.54 9730.55 291.24 5.53 9760.03 291.29 2.24 9788.61 291.34 0.13 MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis [ (c)1998 Anadrill IDEAL ID5 IA 12R] -- -- ANADRILL SCHLUMBERGER Survey Report 20-Jun-98 04:56:47 Page 9 of 10 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 211 15283.41 96.28 307.8 212 15317.36 96.43 309.2 213 15349.50 96.29 307.4 214 15377.13 95.22 305.4 215 15414.44 94.43 305.1 216 15446.62 94.46 307.1 217 15478.82 94.22 307.9 218 15543.26 93.09 306.6 219 15574.91 93.02 307.6 220 15607.17 92.57 308.2 221 15638.92 93.60 309.1 222 15670.52 95.43 309.6 223 15701.90 97.08 311.5 224 15734.30 97.12 309.9 225 15765.81 97.12 310.5 226 15797.39 96.81 311.1 227 15829.49 96.39 312.3 228 15861.78 95.94 310.7 229 15892.12 93.88 315.4 230 15923.16 92.23 314.1 231 15953.51 90.17 314.2 232 16017.59 86.29 313.9 233 16049.54 86.29 313.0 234 16081.60 83.47 314.9 235 16113.78 83.02 315.5 236 16145.70 83.33 317.1 237 16177.69 83.27 314.0 238 16209.55 83.16 313.8 239 16242.25 83.02 314.5 240 16274.02 84,16 314.3 29.50 34.00 32.10 27.60 37.30 32.20 32.20 64.50 31.60 32.30 31.70 31.60 31.40 32.40 31.50 31.60 32.10 32.30 30.30 31.10 30.30 64.10 31.90 32.10 32.20 31.90 32.00 31.90 32.70 31.70 TVD Vertical Displ Displ Total At DLS depth section +N/S- +E/W- displ Azim (deg/ (ft) (ft) (ft) (ft) (ft) (deg) 100f) 8981.81 8978.05 8974.49 8971.73 8968.59 8966.09 8963.66 8959.54 8957.86 8956.28 8954.58 8952.09 8948.67 8944.67 8940.76 8936.93 8933.24 8929.77 8927.18 8925.52 8924.88 8926.86 8928.93 8931.79 8935.58 8939.37 8943.10 8946.87 8950.81 8954.35 9755.85 3579 9786.83 3600 9816.13 3620 9841.70 3636 9876.57 3657 9906.52 3676 9936.18 3696 9995.76 3735 10024.99 3754 10054.71 3774 10083.71 3794 10112.41 3814 10140.57 3834 10169.53 3855 10197.82 3875 10226.06 3895 10254.54 3917 10283.28 3938 10309.92 3959 10336.88 3980 10363.33 4001 10419.33 4046 10447.32 4068 10475.29 4090 10502.93 4113 10529.99 4136 10557.36 4158 10585.09 4180 10613.44 4203 10640.88 4225 .44 -9140.89 9816.73 .47 -9167.33 9849.03 .24 -9192.37 9879.56 .54 -9214.47 9906.10 .99 -9244.82 9942.21 S rvy tool type .90 -9270.76 9973.29 .45 -9296.23 10004.18 .41 -9347.47 10066.20 .44 -9372.64 10096.64 .26 -9398.10 10127.65 291.38 0.71 MWD 291.44 4.12 MWD 291.50 5.59 MWD 291.54 8.19 MWD 291.59 2.26 MWD .03 -9422.82 10157.96 .00 -9447.17 10188.02 .29 -9470.89 10217.61 .26 -9495.26 10248.08 .43 -9519.14 10277.79 291.63 6.19 MWD 291.68 2.59 MWD 291.78 2.67 MWD 291.83 3.17 MWD 291.88 2.32 MWD .93 -9542.88 10307.52 .14 -9566.69 10337.58 .42 -9590.74 10367.91 .02 -9612.79 10396.14 .88 -9634.85 10424.86 291.93 4.31 MWD 291.98 6.00 MWD 292.04 7.99 MWD 292.10 4~90 MWD 292.15 1.89 MWD M .98 -9656.58 10453.01 .52 -9702.62 10512.62 .41 -9725.73 10542.38 .60 -9748.75 10572.18 .29 -9771.28 10601.75 292.21 2.12 292.27 3.94 292.33 5.12 292.38 16.88 292.45 6.75 .18 -9793.16 10630.81 .87 -9815.42 10660.14 .83 -9838.24 10689.73 .44 -9861.53 10720.02 .49 -9884.04 10749.37 MWD M 292.51 6.81 MWD 292.64 6.07 MWD 292.70 2.82 MWD 292.76 10.58 MWD 292.83 2.32 MWD 292.90 5.07 MWD 292.96 9.62 MWD 293.02 0.71 MWD 293.09 2 . 17 MWD 293.15 3.65 MWD Tool qual type 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis -- 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis 6-axis [(c) 1998 Anadrill IDEAL ID5 iA 12R] ANADRILL SCHLUMBERGER Survey Report 20-Jun-98 04:56:47 Page 10 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool qual - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type 241 16305.88 84.78 314.9 31.90 8957.42 10668.49 4247.78 -9906.65 10778.93 293.21 2.70 MWD 6-axis 242 16337.60 86.23 317.8 31.70 8959.91 10695.48 4270,64 -9928.46 10807.99 293.27 10.20 MWD 6-axis 243 16370.45 86.37 317.9 32.80 8962.02 10722.97 4294,91 -9950.42 10837.77 293.35 0.52 MWD 6-axis 244 16401.51 87.67 319.3 31.10 8963.64 10748.84 4318,21 -9970.96 10865.86 293.42 6.14 MWD 6-axis 245 16433.92 89.38 320.1 32.40 8964.47 10775.47 4342,91 -9991.91 10894.91 293.49 5.83 MWD 6-axis 246 16497.76 92.16 !247 16526.68 91.89 248 16562.13 92.85 249 16625.83 93.98 250 16689.65 94.22 327.1 63.90 8963.61 10825.37 4394,30 -10029.80 10950.19 293.66 11.78 MWD 6-axis 327.7 28.90 8962.59 10846.70 4418,63 -10045.36 10974.22 293.74 2.28 MWD 6-axis 327.7 35.40 8961.13 10872.69 4448.53 -10064.26 11003.58 293.85 2.71 MWD M - -- 330.0 63.70 8957.33 10918.54 4502,94 -10097.15 11055.72 294.04 4,02 MWD 6-axis 329.5 63.90 8952.77 10963.81 4558.00 -10129.26 11107.53 294.23 0.87 MWD 6-axis 251 16721.14 94.43 252 16753.35 94.91 253 16785.02 95.18 254 16817.01 95.60 255 16848.60 95.98 328.4 31.40 8950.40 10986.35 4584.82 -10145.41 11133.28 294.32 3,56 327.8 32.20 8947.78 11009.78 4612.07 -10162.37 11159.97 294.41 2.38 326.0 31.70 8944.99 11033.28 4638.52 -10179.61 11186.61 294.50 5.72 325.9 32.00 8941.98 11057.35 4664.92 -10197.45 11213.80 294.58 1.35 326.0 31.60 8938.79 11081.09 4690,96 -10215.05 11240.66 294.67 1.24 MWD 6-axis MWD 6-axis MWD 6-axis MWD 6-axis MWD 6-axis 256 16880.23 96.18 257 16912,08 96.46 258 16940.81 96.98 259 16968.65 97.39 326.0 31.60 8935.45 11104.80 4717.01 -10232,62 11267.51 294.75 0.63 MWD 6-axis 325.6 31.90 8931.94 11128.81 4743.24 -10250.44 11294.68 294.83 1.52 MWD 6-axis 327.4 28.70 8928.58 11150.15 4767.00 -10266.17 11318.95 294.91 6.49 MWD 6-axis 329.5 27.90 8925.09 11170.25 4790.59 -10280.66 11342.03 294.98 7.61 MWD 6-axis ,! (c)1998 Anadrill IDEAL ID5 IA 12R] -- -- Anadrill Client: Field: Well Name: APl number: Job number: Rig: County: State: BP Exploration (Alaska) Inc. Prudhoe Bay Z-38 ~'?J~ / 50-029-22873 40002413 Nabors 18E North Slope Alaska Survey Calculations Calc method for positions: Calc method for DLS: Minimum Curvature Mason & Taylor Depth references Permanent datum MSL, Depth ref. Drill Floor, GL above Permanent KB above Permanent DF above Permanent 0.0 FT 83.7 FT 54.8 FT 85.2 FT 83.7 FT Vertical section ori~lin Latidude (+N/S-): 0 Departure (+E/W-): 0 Azim totarget: 295.75 degrees Schlumberger ANADRILL Survey Report SURVEY REPORT Spud Date: Last survey date: Total accepted surveys: MD of first survey: MD of last survey: RECEIVED JUL 0 1998 BPXA PDC ORIGINAL 14-Apr-98 4-May-98 132 0.00 FT 11822.00 FT Geomagnetic data Magnetic Model: Magnetic Date: Magnetic field strength: Magnetic dec (+E/W-): Magnetic Dip: BGGM 1997 Version 13-Apr-98 1145.94 HCNT 27.88 degrees 80.66 degrees MWD Survey Reference Criteda Reference G: 1002.68 mGal Reference H: 1145.94 HCNT Reference Dip: 80.66 degrees Tolerance G: 4 regal Tolerance H: 6 HCNT Tolerance Dip: 0.3 degrees Correction Magnetic dec (+E/W-): Grid convergence (+E/W-): Total az corr (+E/W-): 27.88 degrees 0.00 degrees 27.88 degrees Seq Measured Incl Azimuth Course # Depth angle angle length (fi) (de~l) (de~l) I 0.00 0.00 0.0 0.0 2 206.00 0.24 78.7 206.0 3 311.18 0.23 104.2 105.2 4 398.63 0.34 149.4 87.4 5 488.96 0.41 142.5 90.4 6 579.57 0.44 118.5 90.6 7 670.71 0.26 224.7 91.1 8 762.30 0.57 222.0 91.6 9 853.92 0.96 247.3 91.6 10 948.12 1.12 256.3 94.2 11 1038.74 1.89 278.0 90.6 12 1133.84 3.12 292.5 95.1 13 1225.00 4.41 296.6 91.2 14 1318.62 4.67 298.7 93.6 15 1411.92 4.30 298.2 93.3 16 1504.96 4.25 298.6 93.1 17 1599.40 4.46 297.0 94.4 TVD Vertical Displacement depth section +N/S- +ENV- ¢) ¢) (fg (~) 0.00 0.00 0.00 0.00 206.00 -0.34 0.08 0.42 311.20 -0.73 0.08 0.84 398.60 -1.11 -0.19 1.15 489.00 -1.63 -0.68 1.48 Total displacement 0.00 0.43 0.85 1.16 1.63 at Azm (deg) 0.00 78.70 84.86 99.43 114.62 579.59 -2.26 -1.t0 1.98 2.27 119.05 670.69 -2.55 -1.41 2.14 2.57 123.42 762.29 -2.35 -1.90 1.69 2.55 138.31 853.88 -1.71 -2.54 0.68 2.63 164.98 948.07 -0.48 -3.06 -0.94 3.20 197.12 DLS (deg/ 10Of) 0.00 0.12 0.10 0.28 0.09 0.20 0.63 0.34 0.55 0.24 1038.63 1.63 -3.06 -3.28 4.49 227.00 1.04 1133.64 5.70 -1.85 -7.23 7.46 255.63 1.44 1224.64 11.69 0.67 -12.65 12.67 273.02 1.44 1317.95 19.09 4.11 -19.21 19.65 282.07 0.33 1410.96 26.38 7.59 -25.63 26.73 286.49 0.40 1503.81 33.31 10.89 -31.73 33.55 288.94 0.06 1597.93 40.47 14.23 -38.07 40.65 290.49 0.26 Page I Schlumberger ANADRILL Survey Report Seq Measured Incl Azimuth Course # Depth angle angle length (fi) (de~l) (de~l) (fl:) 18 1691.69 4.03 285.3 92.3 19 1783.75 3.94 284.5 92.0 20 1877.73 3.80 283.1 94.0 21 1971.29 2.48 289.9 93.6 22 2062.53 2.41 287.9 91.2 23 2154.53 2.35 292.2 92.0 24 2248.69 3.81 291.8 94.2 25 2341.79 5.64 291.0 93.1 26 2434.46 7.64 287.8 92.7 27 2527.43 9.70 286.3 92.9 28 2621.65 11.88 282.6 94.3 29 2715.81 14.08 281.5 94.1 30 2808.19 14.27 282.3 92.4 31 2902.65 16.36 282.2 94.5 32 2996.05 18.97 283.2 93.3 33 3049.98 19.51 282.6 54.0 34 3112.50 21.04 283.7 62.5 35 3204.84 22.06 281.7 92.3 36 3297.04 24.74 282.9 92.2 37 3389.48 26.42 285.1 92.5 38 3480.00 26.72 286.8 90.5 39 3573.25 27.80 287.3 93.3 40 3666.13 30.76 286.4 92.8 41 3757.91 34.36 284.2 91.8 42 3850.63 37.80 282.8 92.7 43 3944.16 40.65 283.1 93.6 44 4037.31 43.84 281.5 93.1 45 4129.28 46.92 280.5 92.0 46 4221.85 47.45 282.4 92.6 47 4315.32 47.55 281.6 93.4 48 4408.55 48.50 282.4 93.3 49 4501.29 49.54 282.1 92.7 50 4593.25 51.43 283.7 92.0 51 4687.50 52.60 284.5 94.2 52 4782.35 52.16 285.6 94.9 53 4876.21 52.40 285.7 93.8 54 4968.63 52.40 285.5 92.4 55 5062.86 52.69 285.9 94.3 56 5154.60 51.24 286.0 91.7 57 5246.92 51.28 286.4 92.3 58 5341.19 49.80 285.5 94.3 59 5434.15 50.10 285.8 92.9 60 5529.36 51.04 285.5 95.3 61 5622.45 51.60 285.3 93.0 TVD Vertical Displacement depth section +N/S- +ENV- 1689.98 47.25 16.71 -44.40 1781.76 53.53 18.36 -50.58 1875.54 59.74 19.87 -56.74 1969.00 2060.12 2152.04 2246.10 2338.88 Total displacement (f~) 47.44 53.81 60.12 atAzm (deg) 290.63 289.95 289.30 DLS (deg/ 1000 1.05 0.11 0.18 64.78 21.26 -61.66 65.23 289.03 1.46 68.64 22.53 -65.34 69.12 289.02 0.12 72.44 23.83 -68.93 72.94 289.07 0.20 77.49 25.72 -73.63 77.99 289.26 1.55 85.14 28.51 -80.77 85.65 289.44 1.97 2430.95 95.78 32.03 -90.89 96.37 289.41 2.19 2522.79 109.62 36.11 -104.28 110.36 289.10 2.23 2615.42 126.91 40.46 -121.38 127.95 288.44 2.42 2707.11 147.44 44.86 -142.05 148.97 287.52 2.35 2796.69 169.41 49.52 -164.20 171.50 286.78 0.30 193.67 54.82 -188.59 196.39 286.21 2.21 221.26 61.06 -216.20 224.65 285.77 2.82 238.60 65.03 -233.54 242.43 285.56 1.06 259.74 69.96 -254.63 264.07 285.36 2.52 292.76 77.40 -287.70 297.93 285.06 1.36 2887.83 2976.73 3027.71 3086.33 3172.18 3256.79 328.37 85.22 -323.47 334.51 284.76 3340.23 367.47 94.91 -362.21 374.43 284.68 3421.17 407.36 t06.03 -401.12 414.90 284.81 3504.11 449.60 118.57 -441.98 457.61 285.02 3585.04 494.43 131.70 -485.41 502.96 285.18 3662.40 542.99 144.69 -533.07 552.35 285.19 3737.31 596.32 157.41 -586.15 606.9t 285.03 3809.81 654.04 170.67 -643.82 666.06 284.85 3878.73 714.90 183.98 -704.97 728.58 284.63 3943.34 778.21 196.46 -769.25 793.94 284.33 4006.28 844.03 209.94 -835.81 861.78 284.10 4069.38 910.91 224.26 -903.17 930.60 283.94 4131.78 978.29 238.69 -971.01 999.92 283.8I 4192.57 1046.33 253.53 -1039.40 1069.88 283.71 4251.11 1115.53 269.39 -1108.57 1140.84 283.66 4309.08 1188.24 287.48 -1180.58 1215.08 283.69 4367.01 1262.10 307.00 -1253.17 1290.22 283.77 4424.40 1335.15 327.01 -1324.61 1364.38 283.87 4480.78 1407.21 346.70 -1395.13 1437.56 283.96 4538.12 1480.92 366.96 -1467.19 1512.38 284.04 4594.62 1552.09 386.80 -1536.63 1584.57 284.13 4652.38 1623.08 406.89 -1605.77 1656.52 284.22 47t2.31 1694.82 426.90 -1675.77 1729.29 284.29 4772.09 1764.84 446.08 -1744.24 1800.38 284.35 4832.62 1837.30 465.94 -1815.12 1873.97 284.40 4890.74 1908.72 485.22 -1885.12 1946.56 284.43 2.95 2.09 0.90 1.18 3.22 4.13 3.82 3.05 3.62 3.44 1.61 0.64 1.20 1.15 2.45 1.41 1.03 0.27 0.17 0.46 1.58 0.34 1.73 0.41 1.02 Page 2 Schlumberger ANADRILL Survey Report Seq Measured Incl Azimuth Course Cf Depth angle angle length 62 5714.54 50.99 284.3 92.1 63 5808.69 49.21 283.6 94.2 64 5902.23 49.29 282.8 93.5 65 5994.94 49.13 282.1 92.7 66 6088.33 48.90 281.3 93.4 67 6183.04 48.93 280.5 94.7 68 6276.57 48.95 280.5 93.6 69 6371.51 49.31 280.4 94.9 70 6465.57 49.81 281.6 94.1 71 6557.43 50.14 283.1 91.8 72 6652.33 50.36 283.0 94.9 73 6749.02 49.00 285.0 96.7 74 6841.86 48.48 284.0 92.9 75 6935.86 47.83 283.3 94.0 76 7028.76 49.28 286.2 92.9 77 7125.26 48.86 286.0 96.5 78 7217.62 48.70 286.1 92.3 79 7312.37 48.06 286.0 94.8 80 7404.90 47.45 284.8 92.5 81 7498.92 47.62 284.8 94.0 82 7593.16 48.53 285.1 94.3 83 7686.35 48.11 285.1 93.2 84 7780.59 49.37 284.9 94.2 85 7868.95 52.03 285.4 88.4 86 7969.04 51.26 284.0 100.0 87 8062.55 50.95 283.4 93.6 88 8155.24 51.72 284.0 92.6 89 8249.77 51.65 283.8 94.6 90 8344.38 50.89 283.5 94.6 91 8435.37 50.90 284.2 91.0 92 8528.99 49.66 287.2 93.6 93 8623.80 50.03 287.6 94.8 94 8716.99 51.59 287.8 93.2 95 8812.19 52.13 288.6 95.2 96 8907.29 52.09 287.9 95.1 97 8997.48 52.38 286.9 90.2 98 9091.61 53.20 285.5 94.1 99 9193.06 51.93 286.0 101.5 100 9288.68 50.36 285.5 95.6 101 9381.45 49.95 285.4 92.8 102 9476.63 49.78 285.1 95.1 103 9569.10 49.91 285.8 92.5 TVD depth 4948.33 5008.76 5069.79 5130.35 5191.61 5253.84 5315.32 5377.42 5438.46 5497.50 5558,18 5620.76 5682.02 5744.73 5806.23 5869.45 5930.27 5993.23 6055.42 6118.88 6181.89 6243.87 6305.99 6361.97 6424.03 6482.80 6540.65 6599.3O 6658.49 6715.89 6775.71 6836.84 6895.73 6954.53 7012.93 7068.17 7125.08 7186.78 7246.75 7306.21 7367.51 7427.16 Vertical section 1979.29 2050.02 2119.16 2187.46 2255.86 2324.85 2392.94 2462.16 2531.42 2599.80 2670.98 2743.15 2811.64 2880.11 2948.46 3020.33 3088.76 3158.62 3225.98 3294.06 3362.98 3431.39 3500.95 3568.19 3645.15 3716.39 3787.10 3859.75 3931.90 4001.00 4071.87 4143.56 42t5.08 4289.31 4363.71 4434.26 4508.16 4587.53 4660.85 4730.95 4802.44 4871.99 Displacement +N/S- 503.58 521.01 537.18 552.31 ¢) -1954.60 -2024.73 -2093.69 -2162.23 566.61 580.11 592.97 605.98 619.65 -2231.27 -2301.36 -2370.75 -2441.32 -2511.62 634.69 651.16 668.99 686.47 703.00 -2580.29 -2651.37 -2722.90 -2790.51 -2858.55 720.74 740.96 760.16 779.75 797.94 -2925.88 -2995.92 -3062.64 -3130.75 -3196.76 815.65 833.75 851.89 870.21 888.09 -3263.80 -3331.59 -3398.79 -3467.19 -3533.22 908.00 925.25 942.38 960.21 977.62 -3609.06 -3679.84 -3750.08 -3822.13 -3893.85 994.53 1013.99 1035.66 1057.62 1081.01 -3962.41 --4031.70 -4100.84 -4169.66 -4240.78 1104.51 1125.83 1146.73 1t68.61 1188.82 -4312.06 -4380.10 -4452.07 .4529.63 -4601.28 1207.80 1226.92 1245.76 -4669.96 -4740.10 -4808.25 Total displacement 2018.43 2090.69 2161.51 2231.65 2302.08 2373.34 2443.78 2515.41 2586.93 2657.20 2730.16 2803.88 2873.70 2943.73 3013.34 3086.19 3155.57 3226.39 3294.84 3364.18 3434.33 3503.93 3574.73 3643.12 3721.53 3794.38 3866.68 3940.90 4014.70 4085.31 4157.26 4229.60 4301.70 4376.39 4451.27 4522.48 4597.38 4677.95 4752.38 4823.62 4896_32 4967.01 at Azm (de~l) 284_45 284.43 284.39 284.33 284.25 284.15 284.04 283.94 283.86 283.82 283.80 283.80 283.82 283.82 283.84 283.89 283.94 283.99 284.02 284.03 284.05 284.07 284.09 284.11 284. I2 284.11 284.11 284.10 284.09 284.09 284.12 284.17 284.23 284.30 284.37 284.41 284.44 284.47 284.49 284.50 284.51 284.53 DLS (deg/ lOO 1.08 1.97 0.65 0.60 0.69 0.64 0.02 0.39 1.11 1.30 0.25 2.11 0.98 0.89 2.81 0.46 0.19 0.68 1.16 0.18 0.99 0.45 1.35 3.04 1.34 0,60 0.97 0.18 0.84 0.60 2.80 0.51 1.68 0.87 0.58 0.93 1.47 t.31 1.69 0.45 0.30 0.60 Page 3 Schlumberger ANADRILL Survey Report Seq Measur~ Incl Azimuth Course # Depth angle angle length (fl:) (de~l) (de~l) (fi:) 104 9662.49 49.66 286.2 93.4 105 9755.44 49.35 286.3 92.9 106 9850.46 49.39 286.3 95.1 107 9944.34 49.65 286.6 93.8 108 10037.96 50.22 285.8 93.7 109 10132.19 50.77 287.3 94.2 110 10224.35 50.57 287.0 92.1 111 10318.54 50.13 287.6 94.2 112 10413.04 50.35 288.6 94.5 113 10506.06 50.27 288.5 93.1 114 10599.20 49.91 289.2 93.1 115 10693.48 49.44 288.8 94.3 116 10786.77 49.03 288.8 93.3 117 10882.32 48.48 289.4 95.5 118 10978.58 49.67 288.9 96.3 119 11069.96 49.36 288.4 91.4 120 11164.33 48.81 287.9 94.3 121 11257.07 48.37 287.7 92.8 122 11351.95 48.58 288.3 94.8 123 11446.85 47.62 289.2 95.0 124 11534.44 49.35 288.6 87.5 125 11576.80 51.07 289.2 42.4 126 11608.98 49.49 289.0 32.2 127 11632.77 49.16 287.1 23.8 128 11664.24 48.90 288.3 31.4 129 11694.96 48.59 287.5 30.8 130 11734.96 49.60 286.6 40.0 131 11762.52 49.38 287.8 27.5 132 11822.00 49.38 287.8 59.5 TVD Vertical Displacement depth section +N/S- +ENV- (ft) (.ri) 7487.46 4942.29 1265.42 -4876.81 7547.79 5011.96 1285.19 -4944.63 Total' displacement (ft) 5038.31 5t08.92 at Azm (deg) 284.55 284.57 7609.72 5083.16 1305.44 -5013.90 5181.06 284.59 7670.61 5t53.57 1325.65 -5082.33 5252.37 284.62 7730.92 5224.28 1345.65 -5151.19 5324_06 284.64 7790.85 5296.03 1366.36 -5220.86 5396.69 284.67 7849.22 5366.47 1387.36 -5288.93 5467.87 284.70 7909.33 5438.21 1408.93 -5358.18 5540.32 284.73 7969.77 5510.20 1431.50 -5427.23 5612.84 284.78 8029.23 5581.28 1454.29 -5495.15 5684.33 284.82 8088.96 5652.17 1477.36 -5562.73 5755.57 284.87 8149.98 5723.57 1500.77 -5630.70 5827.28 284.92 8210.90 5793.71 1523.54 -5697.60 5897.78 284.97 8273.86 5865.04 1547.04 -5765.45 5969.40 285.02 8336.94 5937.31 1570.90 -5834.19 6041.97 285.07 8396.29 6006.30 1593.13 -5900.05 6111.36 285.11 8458.05 6076.93 1615.33 -5967.77 6182.52 285.15 8519.43 6145.86 1636.61 -6034.03 6252.04 285.18 8582.28 6216.19 1658.54 -6101.53 6322.93 285.21 8645.72 6286.37 1681.27 -6168.49 6393.50 285.25 8703.72 6351.41 1702.48 -6230.47 6458.89 285.28 8730.85 6383.76 1713.04 -6261.29 6491.40 285.30 8751.43 6408.36 1721.14 -6284.70 6516.11 285.32 8766.94 6426.25 1726.74 -6301.86 6534.14 285.32 8787.53 6449.72 1733.94 -6324.44 6557.83 285.33 8807.84 6472.66 1741.06 -6346.48 6580.96 285.34 8834.03 6502.54 1749.92 -6375.38 6611.18 285.35 8851.89 6523.22 1756.10 -6395.35 6632.08 285.35 8890.63 6567.94 1769.91 -6438.35 6677.20 285.37 DLS (degl lOO0 0.42 0.34 0.04 0.37 0.89 1.36 0.33 0.68 0.85 0.12 0.69 0.59 0.44 0.74 1.30 0.54 0.71 0.50 0.52 1.23 2.04 4.20 4.93 6.21 3.00 2.20 3.04 3.41 0.00 Page 4 STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Drlg Contractor: Operator: Well Name: Casing Size: 9 5/8 Test: Initial Workover: Nabors BPX Z-38 Set @ Weekly Rig No. 18E PTD# Rep.: Rig Rep.: 3,075 Location: Sec. X Other 98-0060 DATE: 5/13/98 Rig Ph.# 659-4608 Peter Eastwood Dave Hanson 19 T. 11N R. 12E Meridian Umiat MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gert) PTD On Location Yes Standing Order Posted Yes Well Sign OK Drl. Rig OK Hazard Sec. Yes FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Quan. 1 Test Pressure P/F 250~5,000 P 1 250/5,000 P 1 25O~5,OOO P 1 250/5,000 P BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. P/F 1 250/3500 P 1 250~5,000 P 1 250/5,000 P 1 250/5,000 P 1 250/5,000 P 2 250/5,000 P I 250~5,000 F N/A N/A N/AI CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes Test Pressure P/F 16 250/5,000 P/F 32 25O/5,0OO P Functioned Functioned ACCUMULATOR SYSTEM: System Pressure 3000 Pressure After Closure 1600 MUD SYSTEM: Visual Alarm 200 psi Attained After Closure minutes 25 sec. Tdp Tank OK OK System Pressure Attained 1 minutes 50 sec. Pit Level Indicators OK OK Blind Switch Covers: Master: OK Remote: OK Flow Indicator OK OK Nitgn. Btl's: 8 (~ 2100 Meth Gas Detector OK OK Psig. H2S Gas Detector OK OK Number of Failures: 2 ,Test Time: 3.0 Hours. Number of valves tested 24 Repair or Replacement of Failed Equipment will be made within see remarks days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supewisor at 279-1433 REMARKS: Manual kill line valve and #10 valve on choke manifold had slow leaks. Both valves to be repaired and retested after casin~l run on this well. Distribution: orig-Well File c - Oper./Rig c- Database c - Trip Rpt File c -Inspector F1-021L (Rev.12/94) STATE WITNESS REQUIRED? YES x NO 24 HOUR NOTICE GIVEN YES x NO Waived By: Witnessed By: ainkemfe Chuck Scheve MEMORANDUM State of Alaska TO: David JohnstO~ Chairman Alaska Oil and Gas Conservation Commission DATE: May 13, 1998 THRU' Blair Wondzeil. ~ FILE NO' P. I. Supervisor ainkemfe.doc FROM: Chuck Scheve, ~ .¢ SUBJECT: Petroleum Inspector BOPE Test Nabors 18E PBU Z-38 PTD # 98-0060 Wednesday, May 13, 1997: I traveled to BPXs Z-38 Well being drilled by Nabors Rig 18E and witnessed the weekly BOPE test. As the attached AOGCC BOPE test report shows the test lasted 3 hours with two failures. Very minor leaks were detected on the manual kill line valve and the #10 valve on the choke manifold. Both valves will be repaired after casing is run (aprox. 3days) and cemented. The test went well with good test procedures being employed by the Nabors crews. The rig was clean and all related equipment appeared to be in good working order. The location was spacious and well organized. Summary: I witnessed the weekly BOPE test on Well Z-38 being drilled by Nabors Rig 18E. Nabors 18E, 5113/98, Test Time 3 hours, 2 failures Attachment: ainkemfe.xis X Unclassified Confidential (Unclassified if doc. removed ) Confidential STATE OF ALASKA ALASKA b~L AND GAS CONSERVATION corv~qSSlON APPLICATION FOR SUNDRY APPROVAL Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 4310' NSL, 3947' WEL, SEC. 19, T11N, R12E, UM At top of productive interval 774' NSL, 322' WEL, SEC. 14, T11N, R11E, UM At effective depth At total depth 3927' NSL, 3882' WEL, SEC. 14, T11 N, R11 E, UM (As Planned) (As Planned) 5. Type of well: [] Development [] Exploratory [] Stratigraphic E-lService Datum Elevation (DF or KB) Plan RKB = 84.70' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number Z-38 9. Permit Number 98-60 10. APl Number 50-029-22873 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 11822 feet true vertical 8892 feet Effective depth: measured 11415 feet true vertical 8624 feet Casing Length Size Structural Conductor Surface Intermediate Production Liner 80' 20" 3072' 9-5/8" 10948' 7" Plugs (measured) Junk (measured) Cemented 260 sx Arctic Set (Approx.) 205 sx 'G', 1078 sx CS III, 214 sx 'G' 237 sx Class 'H' MD TVD 110' 110' 3102' 3000' 1 O978' 8337' Perforation depth: measured None true vertical Tubing (size, grade, and measured depth) None Packers and SSSV (type and measured depth) None ORIgilIA A~ch0rage 13. Attachments 14. Estimated date for commencing operation May 5, 1998 16. If proposal was verbally approved Description summary of proposal 15. Status of well classifications as: ~.~ [] Oil [] Gas [] Suspended 5/5/98 Service Date approved Prepared By Name/Number: Blair Wondzell Name of approver Contact Engineer Name/Number: W.B. Lloyd, 564-4016 Detailed operations program [] BOP sketch Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed DanStone ~--'~__ ~¢*,-~. ~ Title Engineering Supervisor Commission Use Only Conditions of Approval: Notify Commission so representative may witness Date Z/~- / q i% I Approval No.,.~,~::;' --/,,;;;~ j Plug integrity ,-~ BOP Test Mechanical Integrity Test Subsequent form required 10- · ...'.~ ~.~ ~.o¢. o,m~ 0o9'~ 0Jly,l,~l Signed By e~.~r~e~ Approved by order of the Commission David W. -Johnston_ "IA '~ .... ~,/~ommissioner Form 10-403 Rev. 06/15/88 Submit In Triplicate Z-38 REMEDIAL PLAN Nabors 18-E Current Well Status: 7" 26#/ft set @ 10,978' 6" Wellbore to 11822' Drilled 6" wellbore to 11,822'. Could not get required build through interval and TOOH for bit and motor angle change. RIH with 6" STR09 bit and 2° build assembly but could not get past 11415' (Kingak 'B'). Attempted numerous times to wash and ream through section only to have packoff, high torque and intermittently stuck pipe. Decision was made to plug open hole/cased hole, cut 7" casing at -3400' MD. Set kickoff plug and re- drill new 8-1/2" wellbore. Procedure: 1. TIH with 3-1/2" open ended drill pipe to 11,178' (200' outside of the 7" shoe). Mix and pump 125 sacks of Class 'G' cement and displace as balanced plug. POOH to 10600' and reverse out to clear DP. 2. POOH to 4000' and LD 3-1/2" DP. Displace wellbore to 10.6 ppg LSND fluid to balance 7" x 8-1/2" annulus when casing is cut in Step 4. POOH standing back 3- 1/2" 3. RU SWS and PU 7" CIBP on wireline and RIH to -4000'. Set CIBP for secondary containment. POOH with wireline. Close rams and pressure test plug to 3500 psi for 15 minutes. 4. Run Atlas jet cutter and cut 7" casing at -3400'. RD SWS. 5. PU 7" Baker spear and spear 7" casing. Pull up until first collar dislodges slips. ND BOP and tubing spool and lift same to remove emergency slips. NU BOP and spool. 6. Pull and LD 7" casing. 7. RIH with open ended 3-1/2" DP to -3500'. Set balanced plug of Class G @ 15.8 ppg and(1.15 ft3/sx yield) 200' in and 250' out of 7" casing stub. Cement volume to be based upon 7" capacity x 8-1/2" hole plus 50% excess for open hole volume. Pull to 3150' and reverse circulate to clear drill pipe. LD remainder of 3-1/2" DP. 8. Test BOP's where nippled up on casing flange. PU 8-1/2" milled tooth bit and directional assembly. WOC a minimum of 12 hours prior to drilling. Dress plug and kick off to new directional plan. Drill until bit quits them POOH for PDC bit. RIH with 8-1/2" PDC and directional assembly and drill 8-1/2" section. At -8000', enhance the exisitng LSND with 1 ppb xanvis. Prior to drilling Kingak, additional fluid enhancements will be provided. 9. 8-1/2" TD will be established based upon pending directional plan. Previous bottom hole location will not change. Alaska hared ervices rilling RECEIVED MAY 05 1998 To: Blair Wondzell, AOGCC From: Jim Smilh, SSD Program Chanqes, Well Z-38 Date: May 5, 1998 Attached is a summary of the proposed program changes necessary for well Z-38 in Prudhoe Bay. Inability to prevent hole deterioration (sloughing Kingak) has forced us to plan abandonment of the existing hole in favor of redrilling the entire intermediate section to place the intermediate casing fully across the Kingak. Full details will follow with the appropriate 403 forms tomorrow when Bill Lloyd (Operations Drilling Engineer) has returned from the field. If you have any questions, please feel free to contact Jim Smith at 564-5026. Regard~ ~mith PBU Senior Drilling Engineer FROH~ NRBOR5 tSE ~ HO.= 90? 659 4615 z-3,s Nabors MAY 05 1998 .0~! .& 5as Cons..~_0~nlm'is~ Anchorage Curreng Well Status: 7" 26#/ft set ~ 10978' md. 6" Wellborn to 11822' Drilled 6" wcilbore to 11,822'. Could not get required build through interval and TOOH for bit and motor angle chef, ge. RIH with 6" STR09 bit and 20 build assembly but could not get past 11415' (Kingak 'B'). Attempted numerous times to wash and ream through section only to have paekoff, high torque and intermittently stuck pipe. Decision was made to plug open hole/cased hole, cut 7" casing at -3400' MD, set kickoff plug and redrill new 8-ll2" wellbore. I. TIH with 3-I/2" open ended drill pipe to 11,178' (200' outside of the 7" shoe). Mix and pump 125 sacks of class 'O' cement and displace as balanced plug to end of drill pipe, POOH to 10600' and reverse out to clear DP, 2, POOH to 4000' and LD 3-1/2" DP, Displace wellbore to 10.6 ppg LSND fluid to balance 7" x 8-l/2" annulus when easing is cut in step 4, POOH standing back 3-1/2" 3. RU SW$ and PU 7" CIBP on wireline and RIH to ~4000'. Set CIBP for secondary containment. POOH with wireline, Close rams and pressure test plug to 3500 psi for 15 minutes. 4. Run SWS chemical cutter and cut Y' casing at -3400', RD SWS. 5, pLI 7" Baker spear and spear 7" easing, Pull up until first 7" collar dislodges slips. ND BOP and tbg, spool and lift same to remove emergency slips, NU BOP and spool. 6. Pull and LD 7" casing, Test BOP 7. RHt with ol~n ended 3-1t2" DP to ~3500'. Set 93 sk balanced plug of Class G @ 15.8 ppg (1,15 ft~lsk yield), 1130' in aod 150' out (est. top of plug at 3250') of 7" stub. Volume based upon 7" capacity x 8-1/2" hole plus 50% excess for open h01e volume. Pull to 3000: and reverse out to clear drill pipe. LD remainder of 3-1/2" DP. 8. biD BOP .and NU tubing spool and test same. PU 8-1/2" millect tooth bit and directional assembly. WOC minimum of 12 hours prior to drilling, Dress plug and kick off to new directional plan.. Drill -200' on plan and POOH for PDC bit. RI.FI with 15-112" PDC a~d directional assembly and drill-8-1/2" section. At - 8000', enhance the existing LSND system with I ppb xanthim gum. Prior to drilling Kingak, additional fluid enhancements will be provided. 9. 8-1t2" TD will be established based upon pending directional program. STATE OF ALASKA ALASKA GT~_ AND GAS CONSERVATION COM;'~rlSSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: i~Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 t5. Type of well: [] Development [] Exploratory [] Stratigraphic r-lService 4. Location of well at surface 4310' NSL, 3947' WEL, SEC. 19, T11N, R12E, UM At top of productive interval 774' NSL, 322' WEL, SEC. 14, T11N, R11E, UM At effective depth (As Planned) At total depth 3927' NSL, 3882' WEL, SEC. 14, T11 N, R11 E, UM (As Planned) 6. Datum Elevation (DF or KB) Plan RKB = 84.70' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number Z-38 9. Permit Number 98-60 10. APl Number 50-029-22873 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 11605 feet Plugs (measured) 8751 feet feet Junk (measured) feet Length Size 80' 20" 3072' 9-5/8" 10948' 7" Cemented 260 sx Arctic Set (Approx.) 205 sx 'G', 1078 sx CS Ill, 214 sx 'G' 237 sx Class 'H' MD TVD 110' 110' 3102' 3077' 10978' 8337' Perforation depth: measured None true vertical Tubing (size, grade, and measured depth) None Packers and SSSV (type and measured depth) None ECEIVED ,,-r'~ ~ 1998 Alaska 0il & Gas Cons. 00mmissi0ri Anchorage O ISINA£ 13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch 4. Estimated date for commencing operation April 29, 1998 16. If proposal was verbally approved Name of approver Contact Engineer Name/Numbec W.B. Lloyd, 564-4016 Date approved 15. Status of well classifications as: [] Oil [] Gas [] Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Dan Stone ~--------~----~.~.....¢~, ~ Title Engineering Supervisor Commission Use Only Date Conditions of Approval: Notify Commission so representative may witness Plug integrity_ BOP Test __ Location clearance Mechanical Integrity Test__ Subsequent form required 10- ~..~,~.~e6 OOP¥ Approved by order of the Commission .~.,,~i ~ig,qed By - :.~ ~ '~ ~/~ommissioner Form 10-403 Rev. 06/15/88 ,iavid W. Johnston I Approval NoL~x~-~/' ( ~ Submit In Triplicate (~ALASKA4~ eared rvices rilling BP Exploration / Arco To: Alaska Oil & Gas Conservation Commission Date: April 29, 1998 From; Subject: W. B. Lloyd Operations Drilling Engineer, Nabors Rig 18E Permit #98-60, Z-38 The present status of the Z-38 well is that the 7" casing has become stuck with the casing shoe at 10978'. Circulation is not possible due to packed off annulus. TD of the 8-1/2" hole interval is 11605'. The originally permitted 7" casing setting depth was to have been 11556' MD. This casing was cemented in place with a single stage cement job consisting of 237 sacks of Class G + 30% silica flour. The plug was bumped with 3000 psi. No shallow hydrocarbon potential was identified with the intermediate logging program, therefore a two stage cementing job was not required. The plan forward is to drill a 6" wellbore from 10978' to permitted TD of 16925' and run 4-1/2" liner from TD to 10828' MD. This will be cemented with 678 sacks of Class G cement. GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 AI'rN: Sherrie NO. 12191 Company Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL Sepia Tape Z-38 ~ ~E.~ I 98647 DIFL/ZDL/BHC/CN 980622 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: 12/23/98 BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Bivd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 3940 Arctic Blvd sta~e of Alaska Alaska Oil & Gas Conservation Comm. Atten: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 25-Nov-98 Transmittal of Final Prints. Please sign and return copy to the following: Western Atlas Logging Services Pouch 340013 Prudhoe Bay, AK 99734-0013 and BP Exploration (Alaska) Inc. Petrotechnical Data Center MB 3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 (] :~Well Name :Services i Bluelines Rolled Sepi Film Z-38 DIFL/GR I 1 Z-38 :' ZDL/CN/GR I 1 Z-38 i BHC-AC/GR 1 1 ',! I! NOTE: CORRECTED COPIES - REPLACE PREVIOUS DISTRIBUTION . REC !VED t lOV 5 0 1998 D~e .~ ¢ommiss~ · aas ~ns. Anchorage Contact Rebecca Lange if you have a question concerning this transmittal at (907) 659-2816 or Fax (907) 659-2602. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11441 Company: Alaska OII & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL RF Sepia Tape Z-38 PB1 "~,--~(ol"/ 98375 CDR&IMPULSE 980425 1 Z-38 PB1 98375 CDR 980425 I 1 Z-38 PB1 98375 ~CDR'B/D 980425 1 1 ,, , ,, ,, , PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: 8/18/98 BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: RECEIVED AUG 2 0 1998 Alsska Oit & Gas Cons. Commission Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 State of Alaska Alaska Oil & Gas Conservation Comm. Atten: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Transmittal of Final Prints. Please sign and return copy to the following' Western Altas Logging Services Pouch 340013 Prudhoe Bay, AK 99734-0013 and BP Exploration (Alaska) Inc. Petrotechnical Data Center'MB 3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 24-Jun-98 Well Name Services Bluelines R/F Sepia Film ~'~. oGO Z-38 DIFL/GR 1 1 Z-38 BHC-AC/GR 1 1 Z-38 ZDL/CN/GR 1 1 'i Contact Rebecca Lange if you have a question concerning this transmittal at (907) 659-2816 or Fax (907) 659-2602. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11212 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL RF Sepia Tape Z-38 PB1 ~ -~'-'t ~ 98247 PEX,AITTOOLS 980421 1 Z-38 PB1 98247 PEX-AIT 980421 I 1 Z-38 PB1 98247 PEX-INDUCTION MICROLOG 980421 I 1 Z-38 PB1 98247 PEX-CNL 980421 I 1 Z-38 PB1 98247 PEX-DENSITY/NEUTRON 980421 I 1 ,-- _ Z-38 PB1 98247 PEX-ARRAY SONIC 980421 I 1 Z-38 PB1 98247 PEX-ARRAY SONIC SSTVD 980421 I 1 Z-38 PB1 98247 RFT RAW DATA 980421 I 1 ..... .... 6/1/98 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received by~:~~ TONY KNOWLES, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE. ALASKA 99501-3192 PHONE: (907) 279-14-33 FAX: (907) 276-7542 March 25. 1998 Dan Stone Enginccring Supcn'isor BP Exploration (Alaska). Inc. POBox 196612 Anchoragc. AK 99519-6612 Re: Pmdhoc Bay Unit Z-38 BP Exploration (Alaska). Inc. Permit No 98-60 Sur. Loc.: 4309'NSL. 3948'WEL. SEC. 19. TI 1N. RI2E. UM Btmholc Loc: 3927'NSL. 3882'WEL. SEC. 14. TI IN. R11E. UM Dear Mr. Stone: Encloscd is thc approved application for permit to drill thc abovc referenced xx'cll. Thc permit to drill docs not exempt you from obtaining additional permits required by lax,,' from other govcrnmcntai agcncics, and docs not authorize conducting drilling operations until all other required pcrmitting dctcrminations arc made. Bloxvout prevention cquipmcnt (BOPE) must bc tcstcd in accordancc with 20 AAC 25.035. Sufficicnt notice (approximatcly 24 hours) of thc BOPE tcst pcrformcd before drilling below thc surface casing shoc must be given so that a rcprcscntativc of thc Commission mav witness thc tcst. Notice may bc given by contacting thc Commission petroleum field inspector on thc North Slope pagcr at 659-3607. Chairman BY ORDER OF THE COMMISSION dlf, encl,~sures cc: Department oI' Fish & (;amc. llabitat Section w o encl. l)cpartmcnt o1' l';nvironmcnt Conscn'ation w o cncl. STATE OF ALASKA ALAStO:...)IL AND GAS CONSERVATION CC, .,¢IlSSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] Deepenl [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RKB = 84.70' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028245 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 4309' NSL, 3948' WEL, SEC. 19, T11N, R12E, UM (As Planned) Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 774' NSL, 322' WEL, SEC. 14, T11N, R11E, UM Z-38 At total depth 9. Approximate spud date Amount $200,000.00 3927' NSL, 3882' WEL, SEC. 14, T11N, R11E, UM 03/25/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028240, 1353'I No Close Approach 2560 16925' MD / 8826 TVDss 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 800' Maximum Hole Angle 98-6° Maximum surface 2982 psig, At total depth (TVD) 6764' / 3657 psig i18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' Surface Surface 80' 80' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC 3170' Surface Surface 3107' 3000' 335 sx 'G', 1305 sx PF, 214 sx 'G' 8-1/2" 7" 26# L-80 BTC 11556' Surface Surface 11556' 8655' 319 sx Class 'G' 6" 4-1/2" 12.6# L-80 NSCT 5521' 10169' 6430' 11405' 8670' 850 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet ORIGINAL Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented M D TVD Structural Conductor Surface Intermediate Production P, ECEIVED Liner MAR 2 $1998 Perforation depth: measured Alaska 0il & Gas Cons. commission Anchorage true vertical 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Confact Engineer Name/Number: W.B. Lloyd, 564-4016 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Dan Stone ~--------"~-- .¢,,,~ Title Engineering Supervisor Date 3(/213/~ ~ Commission Use Only Permit Number I APl Number I ApprovalDate I See cover letter ~'~.-~'¢ 50- O,~..¢- 2.,Z.. ~'~ ~1. ~---'~c':.,J('q .~ for other requirements Conditions of Approval: Samples Required []Yes j~No Mud Log Req~reclTM []Yes '~No Hydrogen Sulfide Measures []Yes [] No Directional Survey Required ~'Yes [] No Required Working Pressure for BOPE 1--12M; I-I3M; J~5M; F-I10M; FI15M Other: Original Signed By , by order of IApproved By Commissioner the commission David W, J0t~nst0n Form 10-401 Rev. 12-01-85 subm~ In T~'il~li;ate IWell Name: IZ_38 Weft Plan Summary Type of Well (producer or injector): I Ultraslimhole High Angle Producer Surface Location: 4309' FSL, 3948' FEL, Sec. 19, T11 N, R12E X = 598730, Y = 5959100 Target Start Location: 774' FSL, 322' FEL, Sec. 14, T11 N-R11E X = 592100 Y = 5960760 Target 2: 1232' FSL, 976' FEL, Sec. 14, T11N-R11E X = 591440 Y = 5961210 Target 3: 1679' FSL, 1631' FEL, Sec. 14, T11 N-R11E Target 4: X = 590780 Y = 5961650 2280' FSL, 2473' FEL, Sec. 14, T11 N-R11E Target 5: X = 589930 Y = 5962240 2941' FSL, 3444' FEL, Sec. 14, T11 N-R11E X = 588500 Y = 5962890 Bottom Hole Location' 3927' FSL, 3882' FEL, Sec. 14, T11 N, R11 E X = 588500 Y = 5963870 I AFE Number: I 4P0996 I Estimated Start Date: 13/25/98 I Rig: I Nabors18E Operating days to complete: I 33 MD: 16925' TVD: 8,826'ss RKB/ Surface Elevation (a.m.s.I) TBA/ 45.4' I Well Design (conventional, slimhole, etc.): I Conventional ultra-slimhole high angle producer IObjective: I Selectively geo-steer well to optimally drain two separate zone 4 fault blocks, determine I POWC, and assess cross-fault fluid movements Formation Markers Formation Tops MD TVD (SS) 800' 800 Begin build of 1o/100' ~'7~ ~ ;; '~. ! ~, / ?-..? ¢ 1300 1299 Drop 1°/100' '~ '~ ~-' ''''~'' ~ ~ TM ~ 1800 1714 End 1°/100' drop Base Permafrost 1886 1800 ~"'; ~ ;'~ ;~: TM,,..- ¢~ 2000 1914 KOP - Build l°/100, 2200 2114 Build 1.5°/100' ~aS~ $J] & .... 2400 2314 Build 2°/100' .~;,~s, =~ 2600 2512 Build 2.5°/100' 3107 3000 End 2.5°/100' Sudace casing point in shale, 9-5/8" 47¢ L-80 Sudace casing below the hydrate zone and above the potential hydrocarbon zone - Ugnu 3207 3092 Begin 2.5°/100 build UG4 3269 315O 4353 4010 End 2.5°/100 build CM3 / K-12 5746 4900 TKUP 8535 6680 LCU 8628 6740 TJ F 9897 7550 TJE 10289 7800 TJ D 10641 8025 TJC 11010 8261 TJB 11410 8516 TSAG R 11628 8655 11636 8660 Intermediate Casing Point, 7" 26# L-80 Sh ublik 11675 8685 11732 8721 Begin 14°/100' curve CGOC 11804 8763 11998 8827 End 14°/100' curve; Start Target THOT 12724 8919 OOWC 12803 8929 Begin 10°/100' curve; Target 2 12963 8927 End 10°/100' curve 13605 8831 Begin 10°/100' curve; Target 3 13726 8826 End 10°/100 curve 14642 8880 Begin 10°/100 curve; Target 4 14658 8881 End 10°/100' curve 15819 8929 Begin 10°/100' curve; Target 5 16218 8912 End 10°/100' curve 16925 8826 4-1/2" liner TD 16925 8826 Casin¢/Tubing Proc ram Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. M D/TVD M D/TVDss 30" 20" 91.5# H40 WELD 80' surface 80'/80' 12-1/4" 9-5/8" 40# L-80 BTC 3170' surface 3107'/3000' 8-1/2" 7" 26# L-80 BTC 11556' surface 11556'/8655' 6" 4-1/2" 12.6# L-80 NSCT 5521' 10169'/6430' 11405'/8670' tubing 3-1/2" 12.6# L-80 EUE 11355' surface 11355'/8518' General Mud Program Surface Mud Properties: Fresh water bentonite I 12-1/4" hole section spud mud I Density Marsh Yield 10 sec 10 min pH APl (PPG) Viscosity Point gel gel Filtrate 8.6 300 15 8 10 9 8-15 to 10.2 <150 35 15 30 10 8-15 Intermediate Mud Properties: Fresh Water LSND Density I ViscosityI Yield (PPG) Point 8-1/2" hole section 10sec I 10min APl gel I gel Filtrate HTHP Filtrate Initial LSND 9.3 3-6 Final LSND 10.5 35-40 I 6-8 40-45 10-20 6-10 4-6 <10 Production Mud Properties: Quik Driln 8-1/2" hole section Density Viscosity Yield 10 sec 10 min pH APl HTHP (PPG) Point gel gel Filtrate Filtrate 9.0 32-35 8-12 3-8 5-15 8-9 4-6 10-12 Directional KOP: Maximum Hole Angle: Close Approach Well: +800' MD (estimated) 98.6© None Cement First Stage Second Stage Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments 9-5/8" surface Class "G" tail: Permafrost Lead: Two Stage Job: 335/15.8/1.15 1305/12.2/1.92 First stage calculated as Class "G" tail from TD to the ES cementer at 2611 'md @50% excess Class "G" tail: Second stage calculated as a class "G" 214/15.8/1.15 tail tack from 2611 '-2000'md @30% excess and then Permafrost cement circulated to surface assuming 300% excess. First Stage Second Stage Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments 7" Intermediate Premium Tail: 139 / 11.0 / 3.31 Two Stage Job w/ES Cementer @ 5900' 180 / 15.8 / 1.16 First Stage brings cement 100' above shoe Second Stage brings cement above upper hydrocarbon intervals. 4-1/2" Liner 650 / 15.8/1.16 150' liner lap, TOC 200' above TOL, Class "G" cement, 50% excess Logging Program LWD Logging: 12-1/4" Hole 8-1/2" Hole 6" Hole Open Hole Logs (eline): 12-1/4" Hole 8-1/2" Hole 6" Hole Cased Hole Logs (eline): MWD directional MWD/G R directional MWD directional / GR / Res, Mud Logging Possible Quad combo, possible RFT's & SWC's 1) Platform Express (G R/RES/LDT/NUE) None Well Control Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and will be capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics will be provided when determining rig (rig will be in the current fleet of north slope rigs and the schematics should therefore be on file with AOGCC). The Kuparuk interval will be drilled under the assumption that it is at the abnormal pore pressure of 10.4 ppg EMW pore pressure. Maximum anticipated bottom hole pressure is 3657 psi at 6764'TVDss. Maximum anticipated surface pressure assuming gas in entire annulus (0.1 ppg) is 2982 psi. Hazards · Ugnu may be slightly overpressure due to water disposal at GC-2 which is ,-,10 miles to the east. Estimated mud weight requirement is 9.3 - 9.5 ppg. · Hydrates in the surface interval are anticipated to require mud weights in the range of 10.2-10.5 ppg · One 80' fault is present within the planned wellbore (reservoir) projection. This fault will be discussed within the well plan and measures will be taken to control lost circulation or other problems associated with drilling across the fault. · Based on offset well data, there are known accumulations of frozen gas hydrates within the 200' - 2300' interval. _. The Kuparuk interval is potentially overpressured due to gas injection in the Kuparuk Operating Unit. Recent well data suggests that a pore pressure of 0.54 psi/ft (,-,10.4 ppg EMW) is possible. _. Low reservoir pressure and lost circulation due to Iow pore pressure within the reservoir interval. Disposal Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: Haul all drilling and completion fluids and other class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal. Z-38 Short Well Summary Rig 1. 2. Work: MIRU. NU diverter and function test same. Directionally Drill 12-1/4" hole with MWD Directional to ,-,3107'MD/3000'TVDss. Run and cement 9- 5/8" 40 L-80 casing to surface with Halliburton ES cementer (two stage surface cement job). 3. ND diverter, Install Blow out prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Function test BOPE to 250/5000 psi. 4. RIH with PDC bit, Test 9-5/8" casing to 3000 psi for 30 minutes. Drill out float equipment and shoe and 20' of new formation; perform a formation leak-off test using the BJ cement unit as per the SSD Leak off Test Procedure - expect ,-,13.5 ppg EMW test. 5. Drill 8-1/2" well bore with MWD/GR building @ 2.5°/100' from the surface casing shoe to ,-,4350'. Drill ,,,50o tangent interval to 7" casing setting depth of ,-,11636' MD (8660' TVDss). Run discretional logging program if required. 6. Run and cement 7" 26# L-80 casing to surface and 2 stage cement with Class "G" cement to 1000' above the casing shoe and from ,-,5900' to 3100' for shallow hydrocarbon protection. Bump the plug(s) with 3500 psig, check the floats. 7. RIH with 6" bit, drill the 7" shoe and 20' of new formation and perform a leak-off test. 8. Drill 6" hole with MWD/GR/RES to TD of 16,925'md (8826' TVDss) to the top of the Sadlerochit. 9. Run platform express logs on eline (GR/RES/LDT/NEU). 10. Make a clean out bit run to TD and prepare hole for running casing. 11. Run and cement 4-1/2" 12.6# L-80 solid drilling liner (150' of lap inside 7" casing). Test Casing. 12. Run DPC perforating guns and perforate per post drilling Icg evaluation. 13. Run 3-1/2" L-80 tubing completion and set a 4-1/2" x 7" production packer with tubing tail stung into liner tie-back sleeve. 14. Test tubing and annulus. Set TWC. 15. ND BOP, NU and test tree. 16. Pull TWC, freeze protect, set BPV, RDMO. 17. Well will be tested by PE group following rig release. ~ Commissioi~ Gas Cons. Anchorage PROPOSED DRILLING PROGRAM WELL: Z-38 Drilling Operations: (All depths are approximate) The conductor hole will be pre-drilled and the 20" conductor set and cemented before the rig's arrival and while the camp is set up. Move in, rig up. Accept rig for operations. Nipple up diverter and function test same. The well will be drilled as a horizontal "sinusoidal" profile through the reservoir interval. The 12-1/4" hole section will be directionally drilled from 800'md and with multiple "nudge" intervals in the surface section. 9-5/8" 40# casing will be set at ,--22° and cemented to surface with two stage cementing equipment. Install blowout prevention equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and 5,000psi annular preventer. Test B©P's. Maximum anticipated bottom hole pressure is 3658 psi (10.4 ppg EMW) at 6765' TVD. Maximum possible surface pressure is 2982 psi based on a gas column to surface from 6765' TVD. Formation leak-off tests will be performed 20' below the 9-5/8" and 7" casing shoes. The primary drilling in the 8-1/2" interval is a tangent to 7" setting depth. The 7" will be set with a angle of ,-,50° tangent 11636' MD. In the event shallow hydrocarbons are encountered while drilling the intermediate interval, a platform express logging suite along with RFT's and Side Wall Cores will be run. 7", 26# L-80 casing will be run with a 2 stage cement job planned to cover 100' above the casing shoe and also to cover shallow hydrocarbon intervals. A 6" well bore with a sinusoidal profile will be drilled to tpa two reservoir targets on opposite sides of a bisecting fault. The maximum angle will be 98° through the reservoir section, dropping back to 86.5° then building to 97° at the TD of 16925' MD (8826' TVDss). Platform express will be DPC conveyed. Clean out hole. Run and cement 4-1/2" liner. Drill pipe convey the perforating guns and run 3-1/2" completion string. The well is planned to be tested by the PEs after the drilling rig is moved off of the well. The well is planned to be suspended with the completion string left in the wellbore. If the well is abandoned, the appropriate plugs and markers according to AOGCC regulations will be met. The pad will be cleaned up of any surface debris. W 0_ ._J ~]~ Z 00"0 O0'D O0-OABE965 O0'OOSBB~ 00'0 00'0L8£96S O0'OOSBSS 00'0~ ~H 09'GG~EgGS L6'D[L98S ~ 8E'9S66 ~ ~ gL'9~GG ~ ED'8~II O0'9~BB 06'0~6B f~-gB[[E 00'9588 0L'0~68 ~D'~B~ 00'9E88 OA'0169 ~E'OTSO~ 8£'EE6R 80'6669 L6'~E 6~'6660~ L~'~Z68 66'8668 8I'~EL0] E6'E~6~ E9'9006 O0'L6 O0'L6 O0'L6 O0'L6 99'96 T~'D6 EO'SE69t £0'SE69% O0'O0~9T O0'OOT9I ~A~nD 00I/0I ORE O0'OI ~9£ O0'OI E9£ O0'D ~gL 00'0 ~9£ DO'O 00-0 O0'DI OO'O OOI /~a ~oo~ 09'~IOE965 9S'9IBB85 OO'Q6B[965 OO'OSGBBS 00'068E965 00'0S689~ 9~'6~965 LE'9~66~$ M 80'E986 N 9B'[DOD EL'SfgoI 9S'6E69 95'~06 ~ ~0'~666 N 8£'~96E 99'S~0T 86'0E69 99'S~06 6~'~[£ ~ ~'0£L6 N ~S'SI6E £f'99¥0~ 00'6~68 OL'£[D6 OE'~0E ~ D~'O£L6 ~ ~§'916£ LE'9900~ 00'6E68 0L'£[06 O£'DOE M 8E'ZLLB ~ L0'99EE 59'6IE6 [8'0889 E5'5969 E0'7~6 09'69 ~.9'L8 59 ' LB 59' LB 00'0~g~96S O0'OE66BB ~ 9L'Bgt8 R E9'5§EC 6£'EOE6 00'09Q8 0£'096B 65'90E 69'98 D0'0955965 00'0E668§ ~ ~£'85L8 N E9'55~E 6E'EOE6 00'0~B 0£'0968 6S'SOE 65'98 £6'£~LI965 0~'089065 ~ ~'S[O8 N 9S'£ELZ ~S'~O~B ~5'~EBB 55'0168 6S'50£ GS'9~ Ll'EOLI96S g~'[DL06S M SE'DG6L N 99'80LE ~5'LLEB L~'~EBS LE'6068 £E'S0£ D~'6B 00'059~96~ 00'08£06~ M ES'916L N 99'~g9~ 6S'EB~8 00'IC88 0L'5%69 BE'DOC I9-86 I~OIJ. DES $}[3. dEO- q¥DI &EEA 1~0 I.I. OMBI(I T~ aUC>Z XDISh~/~I 00'0009[ 00'006§I 0L'8185~ 09'I~9~ O0'OOL£~ £8'D09£I ~k~ 00~/0~ ~ oos/o~ ~.%.3 ~A%IBD 00I/0t ~ 8661 ~?[~ OE (96) BE-Z il iiii S ARED 48( 0 800 i§O0 S'ERV"TCES DRIlJl]TN6 .... I a .-...: i ANADR~LL ...... :.' 2400 3200 4000 AnadrYl] i i i i II z-38 (ps) VERTTCAL SE6TION I II Ii . I Section at'. 295,75 TVD Shale · 1 inch = 1600 feet 9ep Scale ' ~ inch = 1600 feet Drawn ' 20 Mar 1998 Schlumberger I I II M~rker Ide~bificat~on MD BKB SECTN A) KB 0 0 0 8] NUDGE B~LD 1/t00 BOO 800 -O C1 DRD;P I/t00 i380 i299 2~ D) END 1/~OO DRO~ tBO0 1799 43 E) KOP 8~JILD ~/100 2000 ~999 43 F) BUILD 1.5/~00 2200 2199 46 G) BUILD 2/100 2400 2398 58 H) BUILD 2.5/~00 2600 2597 82 I) 9-5/8" CS6 PT <l I> 3~07 3085 2t3 J) EIZ] 2.5/~00 BUILD 3~07 3085 2~3 K] g~VE 2.5/100 3207 3178 249 1_) END 2.5/100 CURVE 4353 4095 903 R1 7' CS6 PT <1 ] > i1636 8745 6399 N} CURVE 14/~0O ~1732 8886 5472 O) END 14/~00 CI2RVE ~998 8912 67~1 P) fARGEI SIART ~,~-~-x- 11998 8912 67:11 Q) CURVE 10/t00 12804 9014 7499 R) TGT 2 ~~ 12804 90~4 7499 S) ENO 10/~00 CURVE 12963 90~2 7656 T) CL~VE 10/100 13605 89)6 8284 U] IGT 3 ~*~**~,*~* 13F:>05 89]6 8284 V) END 10/100 CURVE ~3726 69J0 8403 I~] CURVE t0/~00 ~4642 8955 9303 X} TGI 4 ~*~*~*~ :)4642 8955 9303 ~) END 10/t00 ClYFIVE ~4658 8966 9320 Z) CURVE ~0/~00 ~5819 9014 104116 a) fGT 5 ~*~*~**~ 15819 90t4 t0465 b) END 10/~00 CURVE ~6216 8997 10610 c) 4-]/2' LNR PT <J I> 16925 8911 1t288 d) Ti] / lGf ENO ~,~ i5925 8911 }1288 VIEW 4800 5600 6400 7200 8000 Section Departure ii _ i · i ii 6BO0 9600 10400 I NCLN 0.00 0.00 5.00 0 O0 0 O0 2 O0 5 O0 9 O0 21 67 21 67 21 67 50 33 50 33 50 33 82 72 82 7~ 82 7~ 82 72 98 61 98.6t 98.61 86.59 86.59 86.59 87 87.62 87.6~ 97.00 97.00 ~7.00 1~200 ]2000 12600 13600 Ld (d I~1 8~ :~ 32'£ I~BEZ I~ IO) [[TJP~ l, ,,, _ . I '-- 1'''' I ___. II I! II II111~ _. IIII , ' '1'' O0~I I OOI I [ OOeO[ O0~OI O0~OI 0066 009~ 0~6 O00fi OOL9 00~8 00;8 00SZ 00~ O0~L ¢069 0099 OOE9 0009 -0099 -0089 0009 gL'g6R :~ uo[.~aS '),:LC.'"v'.-.'~:' ~11~O'¥NV ~' N3IA N01133S ]¥9IZW3A .................................................................... (Sd) 8 -z , ,. j ..... ~ ..... ('":0'" ~ ~ ~ ...... .~ _~r-~ _'2_:23? -- u- _ .... C)'ZB OTGOT Z66B cJT~g[, 3A~no OO~/OT aN3 (d .~_ .~,~ ................. J 9'LiB 991;'0T I, T06 6T8§~ x~x~-~)~-~ § /gl (O B'LB 991~0T HO6 6TSG~ OOT/O[ ~a3 (N ........ 9'L8 O~E6 9968 9ggb~ ]A~G300T/O; aNB (N ~_~ ........................ I J ~'g9 ~OVB 6T68 9~LE~ ']A~300T/O~ ~3 (P 9'86 ~8~B 9~69 gag~ **~***~**~ S 1Di (I B'B6 Vg~B 9J6~ gag~ oor/o; BABn3 (H ~ i A , L'~B 66~L V~06 VOB~ OOJ/O; 3A~3 (B L'~B TTL9 ~6B 865~T x~,~ [~YJ5 /39U~J (a .. E'og ~LVg 9088 ~LJ[ OOJ/V~ ~A~3 [B ~' DG 66E9 g~LB gEgH ( I1> Ld BS3 ..L IV J .... I fl~fi~ ~ ~ ...... u~fl , ..~'X ~¢k/' __ ~aaj 009 = qou~ ~ aI e3B daa . ~::~. ~aa~ 009 = q~uc ; "aI~aS gAL _ ' ..... . ........ - , .,= V I ~ __ 42 3O0 24( ~BO __ SHARED SERVICES DRILLING ilmlm .. iiiim . . ,, .......... i i mil m i ii iiiii 4nadrj l ] S£/ ]um/2erger Z-38 (P8) PLAN VIEW ii · n mil imlmll CLOSURE _11288 feet at Azimuth 295.75 ]i:" . SCALE ....... : 1 inch = 1200 feet ANADI ',ILL """"--"" ' ' ._ ,~ ~ ~, .:. ¢;] '! : ...... "t,¢4'~ ~ %'~r~'- ~ "-.: ' ~ ~arkerAlKB Ident if ica(ion MDo ~/SoN OE ; - : ~ ~ ~ ~., -:~ BI NUDGE BUILO ~/t00 800 0 N O ~ ...... ~'- ....... : .............. -=. CJ DROP 1/~00 t~00 5 N ; ..~ .................... '-' ................... D) END t/~00 OROP 1800 ti N 42  ................ E) KOP 8UZLD t/~OO 2000 F) BUZLD J.5/100 2200 6) BUILD 2/t00 2400 J4 - ~ R) BUILD 2.5/100 2600 20 N 81 let 5 (P[int) ~) 9-5/B' CSB ¢T <11> 3107 5~ N = J) END 2.5/,OO BUILD 3t07 53, 2,1 N ........} L) END 2.5/~00 CURVE 4353 227 ~ 893 N) CURVE 14/tOD 1t732 1642 N 6393 / j O) END i4/100 CURVE ti~8 1747 N 6608 _~ P) lARGE1 START ~*~ 11998 1747 M ~08 ..... ~) CURVE lO/tO0 12904 8206 N 7262  3 JP~ in(] R) fGT 2 ~R~x~xx~ ~2804 2~6 N 7262 S) END lO/lO0 CUR~E i2969 2~6 N 7393 ....... , ..... , T) CURVE tO/~O0 JSB05 2~4 N 7BJ7  ~ ~ ,~'"~ U) TGT 3 ~*~~ ~3605 2654 N 7917  V) ENB tO/&O0 CURVE ~3725 272~ CURVE tO/~O0 ~454~ 3~56 N 9759 'ge( Stent [~adlu; 150 ~em t I ~ TGT 4 ~*~*~*~ ~4542 3~6 N 8759 ....,,mm,,%' Y) END lO/tO0 CURVE ~4659 3265 N 9772 %~ Z) CURVE tO/~O0 ~5Btg 3919 N 9730 a) TGT 5 ~~*~ ~58t9 3919 N 9730 ~ ~ D) END JO/tO0 CURVE ~6216 42.tl N 9~ ~ c) 4-1/2" LNR PT <1[> ~6925 4904 N ~0167 ~ ~¢~ ~:'~-~ ~) TO /TBl END ~ ~6925 4904 N ~0~67 ~ ,~, ("~*.,,; ......... ~ ..... I ~ I - ]0200 9600 gO00 8400 7800 7200 5500 6000 5400 4800 4200 3600 3000 2400 1900 t200 600 0 600 <- WE.qf ' EAST -> W C~ O_ DO ° 1 "IgL O0'I q9L 00'I q9t £8'~016S6S ~I'I0£$69 M 9£'8g IO'SE £9' EI 9£'~ECI 90'66£I 86'PII% 89'66[I 80'PBE O0'E O0°OOSE £O'PBE 00'~ 00'00~ LO'}Sg DD'S O0'DO£I LO'~8~ O0'P DO'goal 00t/t 60~0 00"] ~gL O0'O 00'0 OOl /~o ~ooz' OB'OOIGS6S 09'9~L86S M 6£'E 0~'00Z6S65 5['6~86S ~ 58'0 O0'OO[6g6S O0'OEL86S M 00'0 O0"DO~6S~S 00'0£L86S ~ 00'0 R ES'O R 00'0 K 00'0 69'/_. S8'0 O0 '0- 00'0 ~IOS~DSS 9I'SIDI 98'660I 9~'SI6 96'666 6~'S~8 66'668 OE'SI£ OO'OO8 Ob'~9- OO'O LD'~ O0'E O0'OOI~ LO'DB~ OO'~ O0'O00E &O'PB~ O0'I O0'OD6 £O~B~ OO'O OO'ODB O0'O OO'O O0'O B/3114IZ~ HqDbT~ ==~====== 00'0Pgg96S O0'OE66BS ~ HI~M ~II~ PiS ~ 00'0I~I96S O0'O~I6S ~ ~IIH RII~ ¥IS ~H~ '00'09&096S O0'DOIZ6S ~ SIEH ~TI£ }~S q~& p~ooo-i p~ooo-x uoT~dT~OZaQ 8P6~ ~$S 6OEP r ...... :auoz ¥~b~"1~ - SROl$¥'JOq b 6gBgDOOg'6~g :'f:~o~I aDel~nS ~n~zCCnD mn~u!~ :'-uo~namoD 09[~-~E x~M 11S%-GgE (LOG) 8TS66 M~ 8H 5Z'55~6565 09'080865 60'59£C LL'889£ IL'609£ OS'ID 00'OO0~ 00'6C 00'006£ 05'9E 00'008C 05'E SH LO'~T56565 66'9~E868 ~ ?S'69D 05'5 S~ L9'£816~65 ~S'09E865 ~ OE'BDf ~ O]'TB OE'9E£ 80"69E£ 8L'£SEE ~ L9'0£ 5~'~B~ ~9'BtI£ 9£'&9~E O0'~E OD'OOL£ OS'~E 00'009£ 00'65 O0'O0~E 05'95 O0'O0~E 00'~ O0'OOEE O~'~ S~ 8£'EE~696~ LE'~E9865 M 00'~ S~ 8E'6]I6gG~ 6~'8D9865 ~ 9I'I8 68'19 LI'6~E E6'E60E ED'LLI£ 60'98~ 6~'E~ O0'ET~ O0'O00E OL'DSO£ LO'%EE 68'~ O0'EIE O0'OOOE 06'D80£ LO'DBE 9~'E5 ~D'DIE 05'EG6E 05'SLOE LO'DEE N $B'£~ 65'9£I N DO'OE 69'668~ 6f'DB65 9~'0~9E 9T'569E 90'5~$~ 96'965E L0'~S5 L0'DBE LO'DBE 66'905£ 66'90I£ 66'90]C O0'O0~E 00'6[ O0'GOOE 05'9[ OQ-OO6E DO'~S GO'OOBE 05'%~ O0'OOL~ 00'6 00'009~ O0~/5'Z (1/Ins OO'~ 5q{ 6G'9%I6~65 EI'E99865 ~ 99'L9 O5'~ ~DL 99'ETI656~ 0£'EL986S ~ E~'LS 05'I ~DL 96'II[656~ ~5'66996~ M DE'O~ 00'I ~9L SB'0[I6S6§ 9~'~99B6~ M 89'~D 00'~ q9L SE'0~]6665 ~L'989865 ~ ~I'ED K 96'9~ IE'B9 N ~D'DT 80'85 N 59']% E5'9~ N E~'0I 9S'C~ OO'O qDL O0'O O0'I 00'1 q9L OO'T 00~ /~e .... g0'0]T6§69 LS'£8996~ ~ DE'~ SO'DI~6~6S £5'L8986~ 5D'0[~6565 LS'L~9$6~ 58'6016565 5~'88986~ ~5'601656~ £6'D69865 ========= 6N'£IEE EO'9~OZ [L'B60E LO'D85 £O'DB~ O0'L 00'00~ 00'5 O0'O0~E 05'£ O0'OOEE O0'OOIE LO'DBE 00'0 LD'DSE 00'0 L0'P~E O0'O L0'~B5 00'5 LO'~Bg 00'5 ~OIZLDE'~I~ N~DNI -= H"IIEC~cI ~IrI.q~! CI'~]6'OrTO~I~ O0'O00E O0'OOB~ OO'OOLI 00'009[ OOI/S"[ Q~In8 NOI~k"'DI&I£NSOI Z ~6~a B66I a~ O~ (~E) W 0_ 00' O O'D ' 0 '~ 00' 8'~ "I'~ O0 ~ 0S9'[96q OO'OB£O6q £5'96~'~965 ~S"B0£'[65 "1[9' E'B~'E96S 9~" D9£'[6S ~ ~S'9~6£ ~ 9~'~595 65'£S~8 00'I£88 O&'S~68 8£'~0£ B 19'E6££ N ~D'965E 66'SS9L S1'L~69 58'I~06 BE'~0E B II'~£L N ~9'0DE~ £E'~6DL ~I'E£69 ~8'LTO6 I9'96 £8'~09E[ 00Z/0I [kh.~hO I9'86 I8'E96~% ~A~f[2) 0OI/0I ~ ~6'~6 O0'O06~I ,;.3 l. DO'O DO'O 00'0 O0'O G~ 00'0IE[96S 00'09~T65 q5 O0'DEE[96S q~ 00'0~I96S 00'0~I65 SI{ 88'S9II96~ ~L'~OSI65 SH OO'09L096~ O0 ' pi S~ 00' 9~ ~BE 00'0 ~q£ 00'09L096S O0'OOI56~ ~9'O~L096S EL'IOI56~ 66'~&9096S OL'OgSE6S 9S'[89096~ 9L'£8Z~6~ 6~'8~096~ 8~'9IE~65 O0'O 00'0 00'0 00"0' 00'0 SB CE'L~9096S 50'65£565 SH IE'0~9096S ~£'88£E6S S~ 8L'9~9096§ LI'~6~6. g SH 9I'665096S 66'9SS~6~ M B£'59~L N 6£'SO~ lb'66~L O0'G&6B 0L'E~O6 ~0'SOE M 0£'59ZL N 6L'SO~E I~'66~L D0'6~68 0L'ETO6 ~O'SOE ~ 0~'~8EL ~ 6L'~OE5 I~'66~L D0'6~68 0L'£ID6 ~O'~DE ~ ~B6IL ~ ~B'09~5 ~I'EE~L 00'6168 OL'EOD6 ~O'SOT ~ I~'8099 ~ I['LDLI DO'~IL9 00'L~88 OL'TI69 DO'~0~ ~ I~'8099 ~ I~'L~LI 0O'~IL9 00'£E8~ D£'~]69 ~O'SOC ~ £I'L5~9 N 89'969I 90'9199 ~r'9089 E6'8998 5S'86~ ~ BS'S~9 ~ 58'~9t 9I'9E59 OD'~8LB OL'E~8B 98'0~5 ~ 99'DSE9 ~ M L¥'I~£9 N ES'£~8I ~ E9'SI£9 N E0'5~9I B ~£'£S~9 N L~'OBST 09'8E~9 00'9898 O&'69L8 ~0'66E9 00'0999 OL'~L9 ~I'g6E9 00'5599 OL'6£L9 ~8'9E~9 OO'9I~9 0&'0099 9E'L565 OD'~9~B 0L'g~[B 58'E8 9L'tO~SI D~OO ~b'E8 9L'EOE~I OOI/OI 2A~qD L~'DL 00'006~] St'OB £8'£09YI 6~'BS 00'008~% CE'OS 60'SL8IT MIq~n_BS dOA 66'0~ OI'B~8I~ ~AZH ~S [E'OS ~6'0[0[I DE& 00'0 OO'0 OD'O DO'O 00'0 SH I~'6S~0965 II'E£IC6S SB 80'S6~O96S 99'S6£E6S SB ~8'£~E096S 6~'889£65 SH 96'~60096S LS'L£9~6S ~ 9E'LIES R LI'S9£I ~ g~'~0S R 90'06~I ~ 0&'6£0~ N ~ ~9'600~ N O0'O OS'E OS'Z~ OS'E /~ ~ L~'89S6~6~ SH E6'9t~696S ~'~E8£6S SH 8£'~066S65 ~L'ELSL6§ SH 69'L8~6~6S SH ~%'ILE6S6~ 99'~%0865 _-- ~% 9L-E6B ~t 69'9E~ B 68'Y8£ N 6['~6] LE'8~8S D0'SE08 OL'6018 £~'~8~ 6E'EO£S 00-O08L OL'~BBL £%'~8~ S8'980S O0'OSSL O&'~gL 0£'6~I~ 00'0769 DL'~589 E~'~8~ L~'gSO~ 00'0S99 OL'D9L9 ZT'¥S6[ 00'006~ 0L'~$65 £~'~8~ 8~'~06 6~'0~O~ 6~'S60~ ~6'~9~ ~I-9£6£ ~B'0909 ~'~8~ 59'06L I6'B06£ I9'£66£ .... ==:= =_ EE'OS SE'I~90I fI2~ GE'OS S~'L696 2D& EE'OS 6~'8Z98 ~ CE'OS IS'~ESB (lfl~l CE'OS CC'OS L0'£S£~ 00'6~ 00'00£~ 05'99 00'00[~ 00'~ 00'OOI~ ====== =======.~ 866I aeN 0E (8d) 8£-Z TREE: 4 1/16" CAMERON KB. ELEV = 84.70' ACTUATOR: BAKER KOP: 800' I Single Ot. 10' x 4.5 inch 12.6# x 3.5 inch MAX ANG = o! i crossover so as to use 4.5 wellhead and 4 98.61 1/16 tree. 13.5" SSSV LANDING NIPPLE ~ '~ ~-- 'I(HES"HXO" 3.813" ID) ! ICAMCO GAS MANDRELS. I #6- 3.5"X1.5" 7" 26# L-80 BTC CSG L ~ 6.276" ID. ~ ~. ~ CAP: .0383 BBLS/FT. i 9 5/8" 40# L-80 BTC ---~ 3106' I SHOE '~-~ I 3.5" 12.6# L-80 BTC TBG. I 7"X3,5" BAKER I I ~t~ 3.5""ESX NIPPLE. PACKER 111385'1 ~ ffi I I 3.5" RESX N'PPLE. 111253' I 4.5"X 7" hanger · · ~. 3.5" HES XN NIPPLE ~ 4.5" 12.6# L80 NSOT LINER '1 3.958" ID/CAP: .0152 BBLS/FT'1 -- '~'~ ~ ~ TD ~ 116925'1 PERFORATION SUMMARY i ~ SIZE SPF INTERVALS £~PEN/SQZ , 4.5 SHOE @ 110925'I'"-" NOTE: 4.5" 12.6# L-80 LINER DATE REV. BY COMMENTS PRUDHOE BAY 2/26/98 B.W.Smith COMPLETION ! RIG 18E 3/20/98 W.B. Lloyd SEC 19. T11N, R12E, DM. BP Exploration (Alaska) #6- 3.5"Xl .5" PERFORATION SUMMARY SIZE SPF INTERVALS £~PEN/SQZ ! I °~/'~°;~'1 I °°~'~:~1 VENDOR ALASKgST 14 O0 DAT~ INVOICE / CRED~ MEMO DESCRIPTION GROSS DISCOUNT NET 02~ CKO2~BD 100.00 100.00 HANDLINO INST: s/h te~eie bubble x ......... n ~".CK IS IN PAYUEm FOR ~MS DE~RIBEO A~VE, mKe]lil~ I 100. O0 100. O0 · WELL PERMIT CHECKLIST COMPANY FIELD & POOL ~ ./-"/O] ~ ,'"'~ INIT CLASS Z~"~.../ WELL NAME,~'- _ Z~, - J~ ~ PROGRAM: exp [] dev~redrll [] serv [] wellbore seg ~ ann. disposal para req' GEOL AREA ~'~¢"~ UNIT# ///~:2,~'© ON/OFF SHORE ~ ADMINISTRATION 1. Permit fee attached ....................... N .2._ Lease number appropriate ................... N 3. Unique well name and number .................. N 4. Well located in a defined pool .................. N 5. Well located proper distance from drilling unit boundary .... N 6. Well located proper distance from other wells .......... N 7. Sufficient acreage available in drilling unit ............ N 8. If deviated, is wellbore plat included ............... N 9. Operator only affected party ................... N 10. Operator has appropriate bond in force ............. N 11. Permit can be issued without conservation order ........ N 12. Permit can be issued without administrative approval ...... N 13. Can permit be approved before 15-day wait ........... N ENGINEERING . APPR D/~TE 14. Conductor string provided ................... f,~ N 15. Surface casing protects all known USDWs ........... (-Y-) N 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ -y 18. CDT will cover all known productive horizons .......... ~ N 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved....,~ N 22. Adequate wellbore separation proposed ............. ~ N 23. If diverter required, does it meet regulations .......... N i1~,..,,~ /,'"/" 24. Drilling fluid program schematic & equip list adequate ..... ~ N 25. DOPEs, do they meet regulation ...... N 26. DOPE press rating appropriate; test to ~'"o-g¢'~ ' ' I~sigl N 27. Choke manifold complies w/APl RP-53 (May 84) ........ N 28. Work will occur without operation shutdown ........... ~ N 29. Is presence of H2S gas probable ................. ~ N 30. Permit can be issued w/o hydrogen sulfide measures ..... 31. Data presented on potential overpressure zones ....... Y/,KI /L,/~/~ 32. Seismic analysis of shallow gas zones ............. /N -33. Seabed condition survey (if off-shore) ............ //' Y N 34. Contact name/phone for weeklyproc~ress reports .... /K.. Y N [exploratory only] GEOLOGY ~R DATEJ REMARKS GEOLOGY: ENGINEERING: COMMISSION: DEW ~'~/~,,'¢' DWJ~ JDH ~ RNC~ CO Lo ~/z~' Comments/Instructions: HOW/Ijt - A:\FORMS\cheklist rev 09~97 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-DEC-1998 13:~ PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/12/23 ORIGIN : FLIC REEL NAME : 98434 CONTINUATION # : PREVIOUS REEL : COMMENT : BP EXPLORATION, PRUDHOE BAY, Z-38, API #50-029-22873-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/12/23 ORIGIN : FLIC TAPE NAME : 98434 CONTINUATION # : 1 PREVIOUS TAPE COMFIENT : BP EXPLORATION, PRUDHOE BAY, Z-38, API #50-029-22873-00 TAPE HEADER PRUDHOE BAY MWD/MAD LOGS WELL NAM~: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT PROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2NDSTRING Z-38 500292287300 BP EXPLORATION SCHLUMiBERGER WELL SERVICES 23-DEC-98 BIT RUN 1 98434 M ST. AMOUR STAFFORD BIT RUN 2 BIT RUN 3 19 llN 12E 84.20 83.70 54.80 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.675 3102.0 8.500 7.000 11574.0 LIS Tape Veri-tY~ation Listing Schlumberger Alaska Computing Center 23-DEC-1998 3RD STRING 6,000 PRODUCTION STRING REMARKS: THIS TAPE CONTAINS THE LDWG FORMATTED LWD IMPULSE DATA AQUIRED ON BP EXPLORATION'S Z-38 WELL. THIS LOG IS THE PRIMARY DEPTH CONTROL. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SUM~L%RY LDWG TOOL CODE $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 17035.4 3268.4 BASELINE DEPTH 88888,0 16875,5 16864.5 16808, 0 16789.5 16768.5 16758.5 16749 0 16742 0 16702 5 16675 5 16664 5 16638 0 16611 5 16541 0 16514 5 16482 5 16405.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... MWD 88897.5 16885.0 16873.5 16819.0 16798.5 16778.0 16768.0 16760.5 16752.0 16711.0 16682.0 16672.0 16646.0 16618.0 16547.0 16522.0 16487.0 16409.0 LIS Tape Veri~t~cation Listing Schlumberger Alaska Computing Center 16396.5 16333.0 16328.0 16317.0 16307.0 16284.5 16276.5 16273.5 16266.0 16263.5 16260.0 16255.0 16233.5 16184.0 16164.0 16158.0 16151.5 16147.5 16144.0 16119.0 16078.0 16070.0 16061.5 16050.5 16042.0 16038.5 16035.5 16032.5 16024.0 16011.5 15991.5 15925.5 15902 5 15871 0 15861 5 15849 5 15838 0 15825 5 15818 5 15813 5 15803 0 15798 5 15795 0 15770 0 15726 5 15716.0 15700.0 15688.5 15673.5 15659.0 15655.5 15646.0 15631.0 15623.5 15597.5 16400.5 16338 5 16334 0 16320 0 16303 0 16274 5 16265 5 16262 0 16255 0 16250 0 16243 5 16234 5 16209 5 16187.5 16173.5 16166.0 16159.0 16155.5 16151.5 16127.5 16083.5 16077.5 16069.0 16058.5 16049.5 16045.0 16043.0 16038.5 16026.0 16010.5 15991.0 15936.0 15910.5 15881 . 5 15868.5 15857.0 15845.0 15835.0 15831.5 15825.5 15809.0 15802.0 15797.5 15773.0 15728.5 15717.5 15702.5 15690.0 15675.0 15661.5 15659.0 15645.0 15631.0 15622.5 15597.5 23-DEC-1998 13:~-l~ PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 15591.5 15574.5 15560.5 15557.0 15553.0 15547.5 15539.5 15512.0 15487.5 15477.5 15451.0 15447.5 15441.5 15439.0 15436.0 15428.5 15424.0 15411.0 15409.0 15398.0 15384.0 15365.0 15346.5 15332.0 15311.0 15305.0 15252.5 15232.5 15230.0 15205.5 15202.0 15199.5 15173.0 15168.0 15163.5 15160.0 15154.0 15150.0 15131.0 15106.5 15032.5 15012.5 14995.5 14973.5 14947.5 14900.0 14875.5 14870.5 14865.5 14849.5 14840.5 14829.5 14827.5 14808.5 14803.0 15590.5 15576.0 15562.5 15559.5 15553.5 15549.5 15543.5 15515.0 15490.5 15477.5 15452.0 15450.0 15445.0 15441.0 15438.0 15428.5 15424.5 15408.5 15406.5 15399.5 15386.0 15366.5 15349.0 15334.0 15310.5 15305.0 15253.0 15233.0 15228.5 15207.5 15204.5 15200.5 15172.0 15168 0 15164 5 15162 5 15153 0 15150 0 15130 0 15106.5 15035 0 15015 5 15000 0 14977 0 14948 5 14895 0 14870 0 14866.0 14861 0 14847 5 14839 5 14827 5 14825 0 14807 5 14802 0 23-DEC-1998 13:-~/ PAGE: LIS Tape Veri~fi~cation Listing Schlumberger Alaska Computing Center 14800.5 14798.0 14788.0 14784.5 14772.0 14765.5 14763.5 14758.5 14752.5 14721.0 14699.5 14688.5 14682.0 14679.5 14673.5 14668.0 14656.0 14643.5 14620.0 14607.0 14595.0 14587.0 14575.0 14573.0 14555.5 14516.5 14485.5 14470.0 14461.5 14451.0 14442.5 14409.5 14365.0 14336.5 14332.5 14316.0 14293.5 14248 5 14245 0 14205 5 14189 0 14183 5 14174 5 14169 0 14159 0 14112 0 14092 5 14066 5 14023 5 14017 5 14010 5 13997 5 13992 0 13982 5 13976 0 14800 5 14799 0 14787 5 14783 5 14769 5 14767 0 14763 5 14760 0 14751 5 14719 5 14693.5 14685.0 14682.0 14680.0 14673.0 14666.5 14655.5 14640.5 14614.5 14602.5 14590.0 14583.0 14572.0 14570.0 14553.0 14512.5 14480.0 14466.5 14459.5 14450.0 14441.5 14408.0 14359.0 14332.5 14329.0 14304.0 14287.5 14245.5 14241.5 14201.0 14183.5 14177.5 14165.5 14158.0 14149.0 14103.5 14086.0 14060.0 14017.5 14008.5 13998.5 13987.5 13981.5 13974.5 13967.0 23-DEC-1998 13:49 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 13967.0 13916.5 13887.5 13839.5 13832.0 13825.0 13813.5 13802.5 13792.5 13782.0 13773.5 13756.5 13715.5 13713.0 13698.5 13692.0 13680.0 13669.5 13627.0 13615.0 13556.0 13540.5 13526.5 13523.5 13517.5 13488.0 13479.5 13446.5 13410.5 13375.0 13327.0 13318.0 13316.5 13306.5 13276.0 13268.0 13234.0 13228. $ 13222.0 13220.0 13183.0 13178.0 13157.0 13136.5 13126.0 13118.5 13116.5 13108.0 13084.5 13075.0 13037.0 13027.5 13009.0 13002.5 12990.0 13956.5 13901.5 13872.5 13830.0 13825.0 13818.5 13805.5 13794.5 13783.5 13774.5 13766.5 13748.5 13707.0 13703.0 13686.5 13680.5 13669.5 13657.0 13615.0 13603.5 13545.0 13528.0 13518.5 13513.5 13505.0 13475.5 13468.5 13436 0 13398 5 13363 5 13318 5 13310 5 13308 5 13301 0 13275 0 13265 0 13221 5 13216 0 13211 0 13206 0 13170 5 13163 0 13141 5 13120 5 13108 5 13103 0 13101 0 13093 5 13069 0 13059 0 13025 5 13013 5 12993 5 12987 5 12974 5 23-DEC-1998 13:49 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 12954.0 12909.5 12848.0 12846.0 12824.0 12810.0 12791.5 12789.5 12778.5 12777.5 12771.0 12767.0 12763.0 12759.0 12734.0 12724.0 12710.0 12707.0 12705.0 12700.5 12689.5 12676.0 12665.0 12647.5 12620.5 12604.5 12585.5 12580.0 12562.5 12557.0 12545.5 12529.5 12517.5 12494.5 12464.0 12386.5 12336.0 12270 5 12267 0 12264 0 12257 0 12252 0 12237 5 12231 0 12218 5 12209 5 12173 5 12050.0 12046.5 12018.5 12001.0 11983.0 11963.0 11935.5 11922.0 12937 0 12893 5 12835 5 12833 0 12807 0 12794 5 12777.5 12775.5 12763.0 12761.0 12756.5 12751.0 12747.5 12742.5 12715.5 12706.5 12692.5 12690.0 12688.5 12681.5 12671.5 12656.0 12645.0 12628.0 12604.0 12587.0 12564.5 12560.5 12543.5 12537.0 12529.5 12514.5 12500.5 12476.5 12447.0 12369.5 12317.0 12252.0 12248.5 12246.0 12238.5 12233.5 12219.0 12211.5 12199.5 12189.5 12156.0 12027.5 12025.5 11998.5 11983.5 11963.5 11942.0 11915.5 11901.5 PAGE: LIS Tape Veri'f~ation Listing Schlumberger Alaska Computing Center 23-DEC-1998 13 :~4~-j PAGE: 11918.5 11910.0 11895.0 11892.0 11880.0 11877.0 11873.5 11864.0 11579.0 100.0 $ MERGED DATA SOURCE LDWG TOOL CODE $ REMARKS: 11898.0 11888.0 11876.0 11872.0 11861.0 11858.5 11853.5 11844.5 11560.0 81.0 BIT RUN NO. MERGE TOP MERGE BASE 1 4210.0 11505.0 2 11505.0 13348.0 3 13348.0 15255.0 4 15255.0 15838.0 5 15838.0 16972.0 THIS FILE CONTAINS THE EDITEDMWDDATA. IT HASBEEN MERGED AT THE DEPTHS SHOWN ABOVE. GRANDROPARE INTERPOLATED FROM 4210 - 11505'. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN THE MWD GR AND THEEDITEDBCS GR AQUIRED BY WESTERNATLAS ON 22-JUN-98. ALL IMPULSE CURVES ARE CARRIED WITH THE GR SHIFTS. THE SHIFTED MWD GR IS NOW THE PDC FOR THIS WELL AS PER AN E-MAIL FROM DAVE DOUGLAS. THE IMPULSE DATA HAS IS INTE~CTIVELY DESPIKEDAT THE TOOL FAILURE POINTS BETWEEN 16540 - 15880'. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 36 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 28 LIS Tape Verif~ication Listing Schlumberger Alaska Computing Center 23-DEC-1998 13:49 PAGE: 9 TYPE REPR CODE VALUE 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 4000241 O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI 4000241 O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD F/HR 4000241 O0 000 O0 0 1 1 1 4 68 0000000000 FET MWD HR 4000241 O0 000 O0 0 1 1 1 4 68 0000000000 RPXXMWD Otff4M4000241 O0 000 O0 0 1 1 1 4 68 0000000000 RPX MWD OHMlVI4000241 O0 000 O0 0 1 1 1 4 68 0000000000 RPS MWD 0HF1~4000241 O0 000 O0 0 1 1 1 4 68 0000000000 RPM MWD OHMM4000241 O0 000 O0 0 1 1 1 4 68 0000000000 RPD MWD 0HP1~4000241 O0 000 O0 0 1 t 1 4 68 0000000000 ** DATA ** DEPT. 17035.402 GR.MWD -999.250 ROP.MWD 17.375 FET.MWD 1.833 RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM. MWD -999.250 RPD.MWD -999.250 DEPT. 3268.400 GR.MWD -999.250 ROP.MWD 3.528 FET.MWD -999.250 RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM. MWD -999.250 RPD.MWD -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-DEC-1998 13:~~ PAGE: 10 **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LOG HEADER DATA DATE LOGGED: FILE HEADER FILE NUMBER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: O . 5000 FILE SUMFLARY VENDOR TOOL CODE START DEPTH STOP DEPTH 3286.5 11574.5 SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIM~) : TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY IMP IMPULSE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: 20-JUN-98 VS.0 69 _ V4 .1 REAL- TIME 17028.0 3286.5 17028.0 22.1 55.3 TOOL NTJFZBER ........... MiO IMPULSE- 475 8.500 3102.0 LSND 9.20 LIS Tape Veri'f~ication Listing Schlumberger Alaska Computing Center 23-DEC-1998 13:49 PAGE: 11 MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHF~4) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REFiARKS: ************ RUN1 ************* 8.5 inch hole section. Powerpulse # 151 CDR # 7027 Downhole software: V4.1 Calibrated: 23-April-98 IDEAL software: VS.0 69 _ Realtime Data ************ RUN2 ************* 8.5 inch hole section. Powerpulse # 344 Downhole software: 4.OB Calibrated: 08-May-98 IDEAL software: VS.0 69 _ Realtime Data ************ RUN3 ************* 6.0 inch hole section. IMPulse #052 Down_hole software: 5.0 53IAB _ Calibrated: 12-May-98 IAB # 003 Downhole software: VI.10 IDEAL software: V5.1 12 IDEAL software: V5.0 69 _ Data from tool memory ************ RUNg 6.0 inch hole section. IMPulse #052 Downhole software: 5.0 53IAB Calibrated: 12-May-98 IAB # 003 Downhole software: VI.10 IDEAL software: VS.1 12 _ Data from tool memory 6.0 inch hole section. IMPulse #052 Downhole software: 5.0 53IAB Calibrated: 12-May-98 800.0 20000 LIS Tape Veri-f'ication Listing Schlumberger Alaska Computing Center 23-DEC-1998 13:49 PAGE: 12 Resistivity failure 15890 - 16530' IAB # 0O3 Down_hole software: Vl.lO IDEAL software: V5.1 12 _ Data from tool memory EDITOR'S NOTE: THIS FILE CONTAINS THE RAW DATA FROM BIT RUN#1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NI]FiB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 4000241 O0 000 O0 0 2 1 1 4 68 0000000000 GR GRRW GAPI 4000241 O0 000 O0 0 2 1 1 4 68 0000000000 GR INT GAPI 4000241 O0 000 O0 0 2 1 1 4 68 0000000000 ROP5 LW1 F/HR 4000241 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-DEC-1998 PAGE: 13 DEPT. 11574.500 GR.GRRW -999.250 GR.INT DEPT. 3286.500 GR.GRRW -999.250 GR.INT -999. 250 ROPS. LW1 -999. 250 ROPS. LW1 28.990 1.270 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 98/12/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SUN~IARY VENDOR TOOL CODE START DEPTH MWD 13362.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TI~E) : TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) STOP DEPTH 11392.0 20-JUN-98 VS.0 69 _ V4.1 REAL- TIM~ 17028.0 3286.5 17028.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-DEC-1998 PAGE: 14 MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY IMP IMPULSE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (Ot~4M) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REM~LgKS: ************ RUN1 *******e***** 8.5 inch hole section. Powerpulse # 151 CDR # 7027 Downhole software: V4.1 Calibrated: 23-April-98 IDEAL software: VS.0 69 _ Realtime Data ************ RUN2 ************* 8.5 inch hole section. Powerpulse # 344 Downhole software: 4.OB Calibrated: 08~May-98 IDEAL software: VS.0 69 _ Realtime Data ************ RUN 3 ************* 6.0 inch hole section. IMPulse #052 Downhole software: 5.0 53IAB Calibrated: 12-May-98 22.1 55.3 TOOL NUMBER ........... MiO IMPULSE- 475 8.500 3102.0 QUI CKDRL 8.90 35000.0 20000 LIS Tape Veri'f'ication Listing Schlumberger Alaska Computing Center 23-DEC-1998 13:~-~ PAGE: 15 IAB # 003 Downhole software: VI.10 IDEAL software: V5.1 12 _ IDEAL software: V5.0 69 _ Data from tool memory **********~* ~UN4 6.0 inch hole section. IMPulse #052 Dow~lhole software: 5.0 53IAB _ Calibrated: 12-May-98 IAB # 003 Downhole software: Vi.10 IDEAL software: VS.1 12 Data from tool memory ************ RU~5 6.0 inch hole section. IMPulse #052 Downhole software: 5,0 53IAB _ Calibrated: 12-May-98 Resistivity failure 15890 - 16530' IAB # 003 Downhole software: Vi.10 IDEAL software: VS.1 12 Data from tool memory EDITOR'S NOTE: THIS FILE CONTAINS THE RAW DATA FROM BIT RUN#2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 20 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Veri~ication Listing Schlumberger Alaska Computing Center 23-DEC-1998 13:49 PAGE: 16 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 4000241 O0 000 O0 0 3 1 1 4 68 0000000000 TABR LW2 4000241 O0 000 O0 0 3 1 1 4 68 0000000000 TE~P LW2 DEGF 4000241 O0 000 O0 0 3 1 1 4 68 0000000000 GR LW2 GAPI 4000241 O0 000 O0 0 3 1 1 4 68 0000000000 ROP5 LW2 F/HR 4000241 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 13362.000 TABR.LW2 8270.000 TEMP.LW2 140.000 GR.LW2 ROP$.LW2 64.290 DEPT. 11392. 000 TABR.LW2 O. 000 TEMP.LW2 156.200 GR.LW2 ROPS . LW2 2722. 950 24.500 62. 760 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION : O01CO1 DATE : 98/12/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 LIS Tape Veri~ication Listing Schlumberger Alaska Computing Center 23-DEC-1998 13:~-~l~ PAGE: 17 DEPTH INCREM~ENT: 0.5000 FILE SUM~L~RY VENDOR TOOL CODE START DEPTH 13342.5 LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 15311.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~ RAY IMP IMPULSE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: ************ RUN1 ************* 20-JUN-98 VS.1 12 VS. 0 53IAB M~4OR Y 17028.0 3286.5 17028.0 22.1 55.3 TOOL NUMBER MiO IMPULSE- 475 6.000 11574.0 QUI CKDRL 8.50 28000.0 20000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-DEC-1998 13:~ PAGE: 18 8.5 inch hole section. Powerpulse # 151 CDR # 7027 Downhole software: V4.1 Calibrated: 23-April-98 IDEAL software: VS.0 69 _ Realtime Data ************ RUN 2 ************* 8.5 inch hole section. Powerpulse # 344 Downhole software: 4.OB Calibrated: 08-May-98 IDEAL software: VS.0 69 Realtime Data ************ RUN3 ************* 6.0 inch hole section. IMPulse #052 Downhole software: 5.0 53IAB _ Calibrated: 12-May-98 IAB # 003 Downhole software: VI.10 IDEAL software: VS.1 12 IDEAL software: VS.0 69 Data from tool memory ************ RUN4 *************** 6.0 inch hole section. IMPulse #052 Downhole software: 5.0 53IAB Calibrated: 12-May-98 IAB # 003 Downhole software: VI.10 IDEAL software: VS.1 12 _ Data from tool memory ************ RUN5 ***************** 6.0 inch hole section. IMPulse #052 Downhole software: 5.0 53IAB _ Calibrated: 12-May-98 Resistivity failure 15890 - 16530' IAB # 003 Downhole software: VI.10 IDEAL software: V5.1 12 _ Data from tool memory EDITOR'S NOTE: THIS FILE CONTAINS THE RAW DATA FROM BIT RUN #3. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-DEC-1998 13:4~ PAGE: 19 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 255 5 66 6 73 7 65 8 68 O.5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUmB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NLC4B SAMP ELEM CODE (HEX) DEPT FT 4000241 O0 000 O0 0 4 1 1 4 68 0000000000 TVDE LW3 FT 4000241 O0 000 O0 0 4 1 1 4 68 0000000000 ROP5 LW3 F/HR 4000241 O0 000 O0 0 4 1 1 4 68 0000000000 TAB LW3 HR 4000241 O0 000 O0 0 4 1 1 4 68 0000000000 TABR LW3 4000241 O0 000 O0 0 4 1 1 4 68 0000000000 AIOH LW3 OH~ff44000241 O0 000 O0 0 4 1 1 4 68 0000000000 A16H LW3 OH~M4000241 O0 000 O0 0 4 1 1 4 68 0000000000 A22H LW3 0tflv~f4000241 O0 000 O0 0 4 1 1 4 68 0000000000 A28H LW3 0I~4PI4000241 O0 000 O0 0 4 1 1 4 68 0000000000 A34H LW3 0t{MM4000241 O0 000 O0 0 4 1 1 4 68 0000000000 PIOH LW3 0HM~4000241 O0 000 O0 0 4 1 1 4 68 0000000000 P16H LW3 0H~I4000241 O0 000 O0 0 4 1 1 4 68 0000000000 P22H LW3 0~4000241 O0 000 O0 0 4 1 1 4 68 0000000000 P28H LW3 OH~ff~4000241 O0 000 O0 0 4 1 1 4 68 0000000000 P34H LW3 Otflvff44000241 O0 000 O0 0 4 1 1 4 68 0000000000 GR LW3 GAPI 4000241 O0 000 O0 0 4 1 I 4 68 0000000000 ** DATA ** DEPT. 13342.500 TVDE.LW3 8933.867 ROPS.LW3 -999.250 TAB.LW3 TABR.LW3 O. 000 AIOH.LW3 3. 671 A16H.LW3 3. 994 A22H. LW3 A28H. LW3 4.985 A34H. LW3 5.280 PIOH. LW3 3.882 P16H. LW3 P22H.LW3 4. 640 P28H. LW3 5. 006 P34H. LW3 5. 364 GR.LW3 O. 000 4. 492 4. 269 22.836 LIS Tape Verif~ication Listing Schlumberger Alaska Computing Center 23-DEC-1998 13:~ PAGE: 20 DEPT. 15311.500 TVDE.LW3 TABR.LW3 3065.094 AiOH.LW3 A28H. LW3 10.581 A34H. LW3 P22H. LW3 8.089 P28H.LW3 8978. 533 ROPS. LW3 8. 674 A16H. LW3 10. 624 P1 OH. LW3 8. 556 P34H. LW3 46. 875 TAB. LW3 9.565 A22H. LW3 7.161 P16H. LW3 9. 001 GR. LW3 0.901 10.195 7.633 24.409 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH MWD 15254.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIM~) : TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : STOP DEPTH 15885.0 20-JUN-98 VS.1 12 _ VS. 0 53IAB _ ~ORY 17028.0 3286.5 17028.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-DEC-1998 13:~'~ PAGE: 21 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMF~ RAY IMP IMPULSE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~ff) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): E~ FREQUENCY (HZ): REMARKS: ************ RUral ************* 8.5 inch hole section. Powerpulse # 151 CDR # 7027 Downhole software: V4.1 Calibrated: 23-April-98 IDEAL software: VS.0 69 _ Realtime Data ************ RUN2 ************* 8.5 inch hole section. Powerpulse # 344 Downhole software: 4.OB Calibrated: 08-May-98 IDEAL software: VS.0 69 _ Realtime Data ************ RUN 3 ************* 6.0 inch hole section. IMPulse #052 22. i 55.3 TOOL NUMBER MiO IMPULSE- 475 6.000 11574.0 QUI CKDRL 8.80 9000.0 20000 LIS Tape Veri[ication Listing Schlumberger Alaska Computing Center 23-DEC-1998 13 :'~4~' PAGE: 22 Downhole software: 5.0 53IAB _ Calibrated: 12-May-98 IAB # 003 Downhole software: Vi.10 IDEAL software: VS.1 12 _ IDEAL software: VS.0 69 _ Data from tool memory ************ RUN 4 *************** 6.0 inch hole section. IMPulse #052 Downhole software: 5.0 53IAB _ Calibrated: 12-May-98 IAB # 003 Downhole software: Vi.10 IDEAL software: VS.1 12 _ Data from tool memory ************ RUNS ***************** 6.0 inch hole section. IMPulse #052 Downhole software: 5.0 53IAB _ Calibrated: 12-May-98 Resistivity failure 15890 - 16530' IAB # 003 Downhole software: Vi.10 IDEAL software: V5.1 12 -- Data from tool memory EDITOR'S NOTE: THIS FILE CONTAINS THE RAW DATA FROM BIT RUN #4. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-DEC-1998 13:~J PAGE: 23 TYPE REPR CODE VALUE 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFiB SAMP ELEM CODE (HEX) DEPT FT 4000241 O0 000 O0 0 5 1 1 4 68 0000000000 TVDE LW4 FT 4000241 O0 000 O0 0 5 1 1 4 68 0000000000 ROP5 LW4 F/HR 4000241 O0 000 O0 0 5 1 1 4 68 0000000000 TAB LW4 HR 4000241 O0 000 O0 0 5 1 1 4 68 0000000000 TABR LW4 4000241 O0 000 O0 0 5 1 1 4 68 0000000000 AIOH LW4 0H~44000241 O0 000 O0 0 5 1 1 4 68 0000000000 A16H LW4 0HI~44000241 O0 000 O0 0 5 1 1 4 68 0000000000 A22H LW4 OH~k44000241 O0 000 O0 0 5 1 1 4 68 0000000000 A28H LW4 0H~44000241 O0 000 O0 0 5 1 1 4 68 0000000000 A34H LW4 0HF~44000241 O0 000 O0 0 5 1 1 4 68 0000000000 PIOH LW4 OHMM4000241 O0 000 O0 0 5 1 1 4 68 0000000000 Pl6H LW4 0H~44000241 O0 000 O0 0 5 1 1 4 68 0000000000 P22H LW4 OHMM4000241 O0 000 O0 0 5 1 1 4 68 0000000000 P28H LW4 OH~4 4000241 O0 000 O0 0 5 1 1 4 68 0000000000 P34H LW4 0H~I4000241 O0 000 O0 0 5 1 1 4 68 0000000000 GR LW4 GAPI 4000241 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 15254. 000 TVDE.LW4 8978. 760 ROPS.LW4 -999.250 TAB.LW4 TABR.LW4 0.000 AIOH. LW4 6.431 A16H. LW4 7.390 A22H.LW4 A28H.LW4 8.402 A34H.LW4 8.593 PiOH. LW4 3.500 P16H.LW4 P22H. LW4 5. 454 P28H. LW4 6. 337 P34H. LW4 7. 082 GR. LW4 DEPT. 15885. 000 TVDE.LW4 8925. 975 ROP5.LW4 7.216 TAB.LW4 TABR.LW4 25570. 000 AIOH.LW4 5. 944 A16H. LW4 6. 653 A22H. LW4 A28H. LW4 7.737 A34H. LW4 8.140 Pl OH. LW4 4.937 P16H. LW4 P22H. LW4 5. 032 P28H. LW4 5. 154 P34H. LW4 5. 359 GR. LW4 O. 000 8. 047 4. 426 19. 030 7.489 7.193 4.988 128.560 ** END OF DATA ** · n~~ LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 24 **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: O. 5000 FILE SUA94ARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 15793.0 17028. O0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAjv~w~A RAY IMP IMPULSE $ 20-JOqV-98 VS.1 12 _ VS. 0 53IAB _ MEMORY 17028. 3286. 17028. 22.1 55.3 TOOL NUMBER MiO IMPULSE- 475 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-DEC-1998 13 :~_~l PAGE 25 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH : MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHN~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) TOOL STANDOFF (IN) EWR FREQUENCY (HZ) RE~IAR~S: ************ RUN 1 ************* 8.5 inch hole section. Powerpulse # 151 CDR # 7027 Downhole software: V4.1 Calibrated: 23 -April - 98 IDEAL software: VS. 0 69 _ Realtime Data 8.5 inch hole section. Powerpulse # 344 Downhole software: 4. OB Calibrated: 08-May-98 IDEAL software: VS. 0 69 Real time Data ************ RUN 3 ************* 6.0 inch hole section. IMPulse #052 Do~thole software: 5.0 53IAB _ Calibrated: 12-May-98 IAB # 003 Down_hole software: Vl. 10 IDEAL software: VS. 1 12 IDEAL software: VS. 0 69 Data from tool memory ************ RUN 4 *************** 6.0 inch hole section. IMPulse #052 Downhole software: 5.0 53IAB _ 6.000 11574.0 QUI CKDRL 8.80 38000.0 20000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-DEC-1998 13 ~-4~~ PAGE: 26 Calibrated: 12-May-98 IAB # 003 Downhole software: Vl. 10 IDEAL software: V5.1 12 Data from tool memory ************ RUN 5 ***************** 6.0 inch hole section. IMPulse #052 Downhole software: 5.0 53IAB _ Calibrated: 12-May-98 Resistivity failure 15890 - 16530' IAB # 003 Downhole software: Vi. 10 IDEAL software: VS. 1 12 _ Data from tool memory EDITOR'S NOTE: THIS FILE CONTAINS THE RAW DATA FROM BIT RUN #5. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 255 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 i ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX) DEPT FT 4000241 O0 000 O0 0 6 1 1 4 68 0000000000 TVDE LW5 FT 4000241 O0 000 O0 0 6 1 1 4 68 0000000000 * ALASKA COMPUTING CENTER . * ....... SCHLUMBERGER ....... . COMPANY NAME : BP EXPLORATION (ALASKA) WELL NAME : Z-38 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292287300 REFERENCE NO : 98607 RECEIVED LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11:0~-~-j PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 99/01/15 ORIGIN : FLIC REEL NAME : 98607 CONTINUATION # : PREVIOUS REEL : CONk4ENT : BP EXPLORATION, PRUDHOE BAY, Z-38, API #50-029-22873-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 99/01/15 ORIGIN : FLIC TAPE NAME : 98607 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : BP EXPLORATION, PRUDHOE BAY, Z-38, API #50-029-22873-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: Z-38 API NTJMBER: 500292287300 OPERATOR: BP EXPLORATION (ALASKA) LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 14-JAN-99 JOB NUMBER: 98607 LOGGING ENGINEER: J SPENCER OPERATOR WITNESS: QUESENBURY SURFACE LOCATION SECTION: 19 TOWNSHIP: liN RANGE: 12E FNL: FSL: 4309 FEL: 3948 FWL : ELEVATION(FT FROM MSL O) KELLY BUSHING: 83.70 DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 7. 000 11574.0 26. O0 2ND STRING 4. 500 16955.0 12.60 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11: O~~/ BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: MWD LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: 20-JUN-98 LOGGING COMPANY: SCHLUMBERGER WELL SERVICES BASELINE DEPTH .............. 88888.0 15146.0 15140.5 15127.0 15092.5 15086.5 15071.0 15066.5 15054.0 15036.0 15028.5 15025.5 15010.5 15009.0 14996.5 14996.0 14989.0 14988.0 14979.5 14975.0 14971.5 14951.5 14918.0 14868.0 14861.5 14855.0 14849.0 14843.5 14836.5 14823.5 14807.0 14796.5 14795.5 14784 5 14782 5 14781 0 14770 0 14768 0 14765 5 14765 0 14752 0 14750 5 14747 5 14746 0 14743.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH ....... 88892.0 15150.0 15144.0 15130.5 15098.0 15091.0 15071.0 15039-.5 15031.0 15015.5 15000.5 14992.5 14870.5 14847.5 14798.5 14787.5 14783.5 14769.5 14766.5 14755.0 14751.5 14746.0 CNT 88892.0 15150.0 15078.0 15060.5 15034.5 15015.5 15000.0 14990.5 14980.5 14977.0 14971.5 14949.0 14916.0 14861.0 14854.0 14847.5 14834.0 14825.0 14810.0 14800.5 14787.5 14777.0 14770.0 14755.0 14751.5 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 14742.5 14731.5 14731.0 14716.5 14716.0 14691.5 14680.5 14680.0 14677.5 14676.0 14675.5 14673.5 14663.0 14662.5 14653.0 14652.0 14645.5 14644.5 14637.5 14621.0 14614.5 14601 0 14590 5 14585 0 14573 5 14572 5 14562 5 14561 5 14529 0 14528 0 14503 5 14502 5 14484.0 14470.0 14469.5 14460.0 14459.0 14449.5 14447.5 14421.5 14415.5 14406.0 14405.0 14393.0 14391.5 14390.0 14389.5 14372.5 14360.0 14357.0 14331.0 14329.5 14324.5 14316.5 14304.5 14301.5 14735.0 14721.0 14684.0 14681.5 14680.0 14665.0 14655.5 14645.0 14613.0 14602.5 14590.0 14584.0 14572.0 14561.0 14527.0 14502.0 14480.5 14467.5 14460.0 14450.5 14424.0 14417.5 14408.0 14391.5 14388.5 14359.0 14332.5 14324.5 14315.0 14300.5 14746.0 14735.0 14721.5 14697.0 14685.5 14681.5 14680.0 14666.5 14655.5 14648.0 14637.5 14622.5 14590.0 14584.0 14572.0 14561.0 14527.0 14502.5 14480.5 14467.5 14459.5 14450.0 14417.5 14408.0 14391.5 14389.5 14371.5 14359.0 14332.5 14324.5 14305.0 14300.5 15-JAN-1999 11:0~--~ PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 14287.5 14288.0 14288.0 14273.5 14272.5 14271.5 14272.5 14250.5 14252.5 14252.5 14240.5 14242.0 14242.0 14202.5 14201.0 14201.0 14189.5 14188.5 14188.5 14187.0 14178.5 14177.5 14178.0 14177.5 14176.0 14174.5 14174.0 14174.5 14167.0 14165.0 14166.5 14165.0 14161.5 14157.0 14161.0 14157.0 14153.5 14149.5 14149.5 14141.5 14137.5 14137.5 14135.0 14133.0 14133.0 14111.5 14110.0 14111.0 14110.0 14102.0 14098.0 14100.5 14098.0 14095.5 14090.5 14090.5 14063.0 14058.0 14050.0 14047.0 14044.0 14043.5 14039.0 14035.0 14031.0 14027.5 14026.5 14023.5 14023.5 14019.5 14020.0 14017.0 14012.5 14008.5 14012.0 14008.5 14006.0 14000.5 13998.5 13993.5 13988.0 13986.5 13981.5 13981.5 13981.0 13976.0 13974.5 13973.0 13972.0 13969.0 13971.0 13969.0 13963.5 13956.0 13962.5 13956.0 13960.0 13953.0 13958.5 13953.0 13937.0 13929.0 13929.0 13918.5 13908.0 13914.0 13908.0 13912.0 13901.5 13905.5 13901.5 13890.0 13887.5 13883.0 13877.0 13879.5 13874.5 13878.5 13876.0 13874.5 13872.5 13837.0 13832.0 15-JAN-1999 11: O'b PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 13834.5 13832.0 13829.5 13833.0 13829.5 13829.5 13824.5 13828.0 13824.5 13823.0 13819.0 13822.0 13819.0 13815.0 13812.0 13814.0 13810.5 13810.0 13805.5 13809.0 13805.5 13799.0 13794.5 13795.0 13788.5 13783.5 13785.0 13780.0 13781.5 13779.0 13778.0 13774.0 13766.0 13761.0 13761.0 13758.0 13759.0 13754.5 13750.5 13744.5 13744.0 13738.5 13734.5 13730.5 13729.0 13725.0 13727.5 13722.5 13726.5 13724.5 13725.0 13719.0 13712.0 13710.5 13704.5 13700.0 13703.5 13700.0 13701.0 13695.0 13700.0 13695.0 13689.5 13685.5 13687.0 13683.0 13680.5 13676.5 13669.5 13667.5 13657.0 13665.5 13657.0 13623.0 13616.5 13622.0 13616.5 13617.0 13611.0 13616.0 13611.0 13602.0 13594.0 13597.5 13591.0 13594.5 13587.5 13587.5 13575.0 13566.0 13566.0 13553.5 13544.5 13553.0 13545.0 13534.5 13529.0 13533.0 13528.5 13527.0 13518.0 13525.5 13518.0 13513.0 13505.5 13505.5 13499.0 13491.5 13491.5 13485.0 13475.5 13480.5 13473.0 13479.0 13473.5 13471.0 13465.5 13469.0 13465.5 15-JAN-1999 11: Ob -~ -' PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 13464.0 13431.0 13419.0 13402.5 13399.5 13379.5 13379.0 13370.5 13347.0 13344 5 13331 5 13330 5 13325 0 13314 0 13279 5 13277 5 13237 5 13232 5 13231 5 13222 5 13217.5 13215.0 13212.0 13207.5 13206.5 13193.0 13174.5 13165.0 13153.5 13151.0 13142.0 13124.5 13121.0 13111.0 13109.5 13108.0 13066.0 13048.5 13028.5 13022 5 13015 0 12999 5 12984 0 12968 0 12904 5 12861 5 12836 0 12834 5 12826 0 12820 0 12809.0 12808.0 12805.5 12804.0 12790.0 12789.5 13460.0 13425.0 13396.5 13372.5 13339.0 13322.0 13307.0 13270.5 13232.0 13225.5 13207.0 13198.5 13184.0 13154.5 13113.5 13108.5 13101.0 13097.5 13041.5 13022.0 13014.0 13008.0 12990.0 12974.5 12956.5 12893.5 12822.0 12796.0 12795.0 12780.0 13460.0 13425.0 13414.5 13396.5 13372.5 13363.5 13335.0 13322.0 13318.5 13307.0 13270.5 13232.0 13225.5 13216.0 13211.0 13205.5 13198.5 13184.0 13170.5 13143.5 13141.5 13134.0 13101.0 13059.0 13041.5 13022.0 13014.0 13008.0 12990.0 12974.5 12956.5 12893.5 12849.0 12822.0 12811.0 12807.5 12796.5 12795.0 12780.0 15-JAN-1999 11:0~~ PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 12786.5 12776.5 12772.5 12771.5 12770.5 12761.0 12757.0 12751.0 12743.5 12724.0 12717.5 12704.0 12702.0 12699.5 12691.5 12690.5 12674.0 12671.5 12656.0 12651.5 12641.0 12636.0 12620 0 12598 5 12595 0 12590 0 12586 0 12563 5 12545 0 12529 5 12520 5 12515.0 12513.0 12507.0 12504.5 12497.5 12487.5 12460.5 12460.0 12453.5 12451.0 12439.5 12432.0 12430.5 12422.0 12420.5 12413.5 12379.5 12375.0 12362.0 12325.5 12311.0 12277.0 12271.5 12253.0 12247.0 12777.5 12777.5 12766.0 12766.0 12763.0 12761.0 12761.0 12751.0 12751.0 12747.5 12747.5 1274~.5 12741.5 12732.0 12711.5 12692.5 12690.5 12678.0 12656.5 12706.5 12690.5 12680.0 12656.5 12643.0 12643.0 12637.0 12637.0 12628.5 12628.5 12622.0 12622.0 12607.0 12607.0 12587.0 12587.0 12582.0 12582.0 12576.5 12576.5 12570.5 12570.5 12550.5 12550.5 12533.5 12533.5 12516.5 12516.5 12507.5 12507.5 12501.0 12501.0 12494.0 12493.5 12487.0 12487.0 12476.5 12476.5 12447.5 12447.0 12443.0 12445.0 12439.5 12439.5 12426.0 12418.5 12418.5 12411.0 12411.0 12404.0 12404.0 12369.5 12369.5 12363.5 12363.5 12350.5 12350.5 12313.0 12313.0 12298.0 12298.0 12265.0 12265.0 12258.5 12258.5 12238.5 12233.5 15-JAN-1999 11:0~~.-t PAGE: 7 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11: 08 ..... 12237.5 12224.5 12224.5 100.0 85.5 85.5 $ REMARKS: CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE MCNL DATA AQUIRED ON BP EXPLORATION'S Z-38 WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND THE MWD GAF~A RAY, ALSO PASS #1 NRAT AND THE MWD GAFk4A RAY, CARRYING ALL MCNL CURVES WITH THE i~RAT SHIFTS. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE AHJMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SOFR4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 15156.0 12055.5 CNT 15154.0 12055.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NTJMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNT .............. REMARKS: THIS FILE CONTAINS CASED HOLE MCNL PASS #1. NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA THERE ARE LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11:0~ PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 t 1 1 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNT V O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 15156. 000 GRCH. CNT 18.164 NRAT. CNT - 999. 250 CCL. CNT - 999. 250 DEPT. 12055. 500 GRCH. CNT 29. 820 NRAT. CNT 13 . 080 CCL. CNT 85. 000 NCNT. CNT -999.250 FCNT. CNT -999.250 NCNT. CNT 4498.500 FCNT. CNT 272.813 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 10 **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION . O01CO1 DATE · 99/01/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SOWk4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 15154.5 12061.0 CNT 15153.0 12062.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GRCH CNT 88888.0 88892.0 88892.0 15146.0 15150.0 15150.0 15140.5 15144.0 15127.0 15130.5 15092.5 15098.0 15086.5 15091.0 15071.0 15078.0 15066.5 15071.0 15054.0 15060.5 15036.0 15039.5 15028.5 15034.5 LIS Tape Veri'f-i~ation Listing Schlumberger Alaska Computing Center 15-JAN-1999 11 :~-.l PAGE: 11 15025 5 15010 5 15009 0 14996 5 14996 0 14989 0 14988 0 14979 5 14975 0 14971 5 14951 5 14918 0 14868 0 14861 5 14855 0 14849 0 14843 5 14836 5 14823 5 14807 0 14796 5 14795 5 14784 5 14782 5 14781 0 14770 0 14768 0 14765 5 14765 0 14752 0 14750.5 14747.5 14746.0 14743.0 14742.5 14731.5 14731.0 14716.5 14716.0 14691.5 14680.5 14680.0 14677.5 14676.0 14675.5 14673.5 14663.0 14662.5 14653.0 14652.0 14645.5 14644.5 14637.5 14621.0 14614.5 15031.0 15015.5 15000.5 14992.5 14870.5 14847.5 14798.5 14787.5 14783.5 14769.5 14766.5 14755.0 14751.5 14746.0 14735.0 14721.0 14684.0 14681.5 14680.0 14665.0 14655.5 14645.0 14613.0 15015.5 15000.0 14990.5 14980.5 14977.0 14971.5 14949.0 14916.0 14861.0 14854.0 14847.5 14834.0 14825.0 14810.0 14800.5 14787.5 14777.0 14770.0 14755.0 14751.5 14746.0 14735.0 14721.5 14697.0 14685.5 14681.5 14680.0 14666.5 14655.5 14648.0 14637.5 14622.5 LIS Tape Veri~'~cation Listing Schlumberger Alaska Computing Center 15-JAN-1999 11:~~ PAGE: 12 14601.0 14590.5 14585.0 14573.5 14572.5 14562.5 14561 . 5 14529.0 14528.0 14503.5 14502.5 14484.0 14470.0 14469.5 14460.0 14459.0 14449.5 14447.5 14421.5 14415.5 14406.0 14405 0 14393 0 14391 5 14390 0 14389 5 14372 5 14360 0 14357 0 14331 0 14329 5 14324 5 14316 5 14304.5 14301.5 14287.5 14273.5 14271.5 14250.5 14240.5 14202.5 14189.5 14188.5 14178.5 14178.0 14176.0 14174.0 14167.0 14166.5 141 61.5 14161.0 14153.5 14141.5 14135.0 14111.5 14602.5 14590.0 14584.0 14572.0 14561.0 14527.0 14502.0 14480.5 14467.5 14460.0 14450.5 14424.0 14417.5 14408.0 14391.5 14388.5 14359.0 14332.5 14324.5 14315.0 14300.5 14288.0 14272.5 14252.5 14242.0 14201.0 14187.0 14177.5 14174.5 14165.0 14157.0 14149.5 14137.5 14133.0 14590.0 14584.0 14572.0 14561.0 14527.0 14502.5 14480.5 14467.5 14459.5 14450.0 14417.5 14408.0 14391.5 14389.5 14371.5 14359.0 14332.5 14324.5 14305.0 14300.5 14288.0 14272.5 14252.5 14242.0 14201.0 14188.5 14177.5 14174.5 14165.0 14157.0 14149.5 14137.5 14133.0 14110.0 LIS Tape Veri~i~cation Listing Schlumberger Alaska Computing Center 15-JAN-1999 11 PAGE: 13 14111.0 14102.0 14100.5 14095.5 14063.0 14050.0 14044.0 14039.0 14031.0 14026.5 14023.5 14020.0 14012.5 14012.0 14006.0 13993.5 13986.5 13981.0 13974.5 13972.0 13971 0 13963 5 13962 5 13960 0 13958 5 13937 0 13918 5 13914 0 13912 0 13905 5 13890 0 13883 0 13879.5 13878.5 13874.5 13837.0 13834.5 13833.0 13829.5 13828.0 13823.0 13822.0 13815.0 13814.0 13810.0 13809.0 13799.0 13788.5 13785.0 13781.5 13778.0 13766.0 13761.0 13759.0 13750.5 14110.0 14098.0 14090.5 14058.0 14047.0 14035.0 14027.5 14023.5 14019.5 14008.5 14000.5 13988.0 13981.5 13976.0 13969.0 13956.0 13953.0 13929.0 13908.0 13901.5 13877.0 13874.5 13832.0 13829.5 13824.5 13819.0 13812.0 13810.5 13805.5 13794.5 13783.5 13780.0 13774.0 13761.0 13754.5 13744.5 14098.0 14090.5 14043.5 14017.0 14008.5 13998.5 13981.5 13973.0 13969.0 13956.0 13953.0 13929.0 13908.0 13901.5 13887.5 13876.0 13872.5 13832.0 13829.5 13824.5 13819.0 13805.5 13795.0 13779.0 13758.0 LIS Tape Verl~cation Listing Schlumberger Alaska Computing Center PAGE: 14 13744.0 13734.5 13729.0 13727.5 13726.5 13725.0 13712.0 13704.5 13703.5 13701.0 13700.0 13689.5 13683.0 13676.5 13667.5 13665.5 13623.0 13622.0 13617.0 13616.0 13602.0 13597.5 13594.5 13575.0 13553.5 13553.0 13534 5 13533 0 13527 0 13525 5 13513 0 13499 0 13485 0 13480 5 13479 0 13471 0 13469.0 13464.0 13431.0 13419.0 13402.5 13399.5 13379.5 13379.0 13370.5 13347.0 13344.5 13331.5 13330.5 13325.0 13314.0 13279.5 13277.5 13237.5 13232.5 13738.5 13730.5 13725.0 13722.5 13719.0 13700.0 13695.0 13685.5 13669.5 13657.0 13616.5 13611.0 13587.5 13566.0 13544.5 13529.0 13518.0 13505.5 13491.5 13475.5 13473.0 13465.5 13460.0 13425.0 13396.5 13372.5 13339.0 13322.0 13307.0 13270.5 13232.0 13225.5 13724.5 13710.5 13700.0 13695.0 13687.0 13680.5 13657.0 13616.5 13611.0 13594.0 13591.0 13587.5 13566.0 13545.0 13528.5 13518.0 13505.5 13491.5 13473.5 13465.5 13460.0 13425.0 13414.5 13396.5 13372.5 13363.5 13335.0 13322.0 13318.5 13307.0 13270.5 13232.0 LIS Tape Veri£~cation Listing Schlumberger Alaska Computing Center 15-JAN-1999 11 ?~ PAGE: 15 13231.5 13222.5 13217.5 13215.0 13212.0 13207.5 13206.5 13193.0 13174.5 13165.0 13153.5 13151.0 13142.0 13124.5 13121.0 13111.0 13109.5 13108.0 13066.0 13048 5 13028 5 13022 5 13015 0 12999 5 12984 0 12968 0 12904 5 12861 5 12836 0 12834 5 12826.0 12820.0 12809.0 12808.0 12805.5 12804.0 12790.0 12789.5 12786.5 12776.5 12772.5 12771.5 12770.5 12761.0 12757.0 12751.0 12743.5 12724.0 12717.5 12704.0 12702.0 12699.5 12691.5 12690.5 12674.0 13207.0 13198.5 13184.0 13154.5 13113.5 13108.5 13101.0 13097.5 13041.5 13022.0 13014.0 13008.0 12990.0 12974.5 12956.5 12893.5 12822.0 12796.0 12795.0 12780.0 12777.5 12766.0 12763.0 12761.0 12751.0 12747.5 12741.5 12711.5 12692.5 12690.5 12678.0 13225.5 13216.0 13211.0 13205.5 13198.5 13184.0 13170.5 13143.5 13141.5 13134.0 13101.0 13059.0 13041.5 13022.0 13014.0 13008.0 12990.0 12974.5 12956.5 12893.5 12849.0 12822.0 12811.0 12807.5 12796.5 12795.0 12780.0 12777.5 12766.0 12761.0 12751.0 12747.5 12741.5 12732.0 12706.5 12690.5 12680.0 12656.5 LIS Tape Veri'f~cation Listing Schlumberger Alaska Computing Center PAGE: 16 12671.5 12656.0 12651.5 12641.0 12636.0 12620.0 12598.5 12595.0 12590.0 12586.0 12563.5 12545.0 12529.5 12520.5 12515.0 12513.0 12507.0 12504.5 12497.5 12487.5 12460.5 12460.0 12453 5 12451 0 12439 5 12432 0 12430 5 12422 0 12420 5 12413 5 12379 5 12375 0 12362 0 12325 5 12311 0 12277 0 12271 5 12253 0 12247 0 12237 5 12225 5 12215 5 12173 5 12172 5 12171 0 12170 0 12164 5 12151.0 12097.5 100.0 $ REMARKS: 12656.5 12643 0 12637 0 12628 5 12622 0 12607 0 12587 0 12582 0 12576 5 12570 5 12550.5 12533.5 12516.5 12507.5 12501.0 12494.0 12487.0 12476.5 12447.0 12443.0 12439.5 12426.0 12418.5 12411.0 12404.0 12369.5 12363.5 12350.5 12313.0 12298.0 12265.0 12258.5 12238.5 12233.5 12224.5 12211.5 12158.5 12643.0 12637.0 12628.5 12622.0 12607.0 12587.0 12582.0 12576.5 12570.5 12550.5 12533.5 12516.5 12507.5 12501.0 12493.5 12487.0 12476.5 12447.5 12445.0 12439.5 12418.5 12411.0 12404.0 12369.5 12363.5 12350.5 12313.0 12298.0 12265.0 12258.5 12224.5 12211.5 12201.0 12160.0 12157.0 12156.5 12151.0 12151.0 12137.0 12083.0 12083.0 85.5 85.5 THIS FILE CONTAINS CASED HOLE MCNL BORAX PASS #1. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH BORAX PASS #1 AND GRCH BASE PASS #1, ALSO NRAT LIS Tape Veri-~cation Listing Schlumberger Alaska Computing Center 15-JAN-1999 11: ~J ~ PAGE: 17 BORAX PASS #1 AND NRAT BASE PASS #i, CARRYING ALL MCNL CURVES WITH THEN RAT SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN * * NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNT V O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 15154.500 GRCH. CNT 18.688 NRAT. CNT -999.250 CCL.CNT -999.250 NCNT. CNT -999.250 FCNT. CNT -999.250 LIS Tape Ver~-f~'cation Listing Schlumberger Alaska Computing Center 15-JAN-1999 11 :'~'o PAGE: 18 DEPT. 12061 . 000 GRCH. CNT NRAT. CNT - 999. 250 CCL. CNT 27.438 NCNT. CNT -999.250 -999.250 FCNT. CNT -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE · 99/01/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION : O01CO1 DATE · 99/01/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 15156.0 12060.5 CNT 15156.5 12063.0 CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GRCH CNT 88888.0 88892.0 88894.5 15146.0 15150.0 15135.0 15141.5 LIS Tape Veri~f~i~cation Listing Schlumberger Alaska Computing Center 15-JAN-1999 11: ~" PAGE: 19 15109.5 15096.5 15094.0 15082.0 15074.0 15068.5 15062.0 15048.5 15042.0 15031.5 15030.0 15010.5 15005 0 15000 0 14963 0 14951 5 14940 0 14913 0 14911 0 14908 5 14903 0 14885 0 14867.5 14863.0 14844.0 14843.0 14801.0 14791.0 14788.5 14786.0 14784.5 14783.5 14782.0 14780.0 14753.5 14752.0 14707.0 14702.0 14694 5 14678 5 14677 5 14673 5 14671 0 14664 0 14662 0 14658 0 14654.0 14652.0 14645.5 14641.5 14624.5 14616.0 14595.5 14595.0 14584.0 15098.5 15083.0 15071.0 15053.0 15036.5 15015.5 15004.5 14954.5 14914.5 14906.5 14866.0 14847.5 14791.5 14787.0 14784. 0 14781. 0 14755.0 14710.5 14705.0 14681.5 14676.5 14673. 0 14665.5 14659.5 14655.5 14643.5 14625.5 14617.5 14595.0 14582.0 15116.5 15100.0 15078.5 15063.5 15046.5 15034.5 15008.5 14963.5 14952.5 14940.5 14915.5 14910.5 14887.5 14872.5 14848.0 14804.5 14793.0 14787.5 14783.5 14755.0 14697.0 14681.5 14666.0 14655.0 14648.5 14597.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11: o~-~ PAGE: 20 14580.0 14579.0 14564.0 14559.0 14557.5 14554.0 14550.0 14545.0 14540.0 14529.5 14499.5 14470.0 14465.5 14455.0 14454.5 14450.0 14448.5 14445.0 14436.5 14436.0 14434.0 14428.5 14424.5 14418.0 14416.0 14414.0 14407.0 14391.5 14387.5 14381.0 14376.0 14372.5 14371.0 14360.5 14358.5 14345.5 14335.0 14325.5 14317.0 14315.5 14308.0 14298.5 14294.5 14284.5 14282.5 14271.0 14250.5 14245.5 14245.0 14230 0 14220 0 14210 5 14198 0 14190 5 14180 0 14577.0 14556.5 14554.0 14552.0 14547.0 14499.0 14455.0 14451.0 14438.0 14435.5 14428.0 14426.0 14419.5 14408.0 14374.5 14370.5 14359.5 14342.5 14334.5 14315.0 14312.0 14307.0 14293.0 14281.0 14252.5 14245.5 14177.5 14580.5 14568.0 14544.5 14539.5 14529.5 14499.5 14470.5 14468.0 14457.0 14450.5 14446.5 14436.0 14419.5 14417.5 14389.5 14386.5 14380.0 14371.0 14359.0 14337.0 14325.0 14298.5 14284.5 14270.0 14243.0 14225.5 14216.5 14207.0 14196.0 14189.0 LIS Tape Veri'~ication Listing Schlumberger Alaska Computing Center 15-JAN-1999 11 '.~ PAGE: 21 14179.5 14177.5 14175.5 14174.5 14167.5 14165.0 14160.0 14157.0 14151.5 14147.5 14150.5 14148.0 14140.5 14136.0 14123.5 14121.5 14110.0 14106.0 14089.5 14084.0 14082.5 14079.5 14032.0 14029.5 14007.0 14001.0 14006.0 14002.5 13996.5 13991.0 13994.0 13991.0 13987.5 13981.5 13981.5 13979.5 13971.0 13969.0 13964.5 13957.0 13962.5 13954.5 13945.5 13944.5 13922.5 13913.5 13922.0 13920.5 13912.5 13901.5 13905.0 13894.0 13898.5 13887.0 13895.5 13894.0 13875.0 13872.5 13831.0 13829.5 13829.5 13824.0 13811.5 13808.0 13811.0 13805.5 13788.0 13784.0 13767.0 13761.0 13759.5 13759.0 13746.0 13739.0 13744.0 13709.0 13703.5 13706.5 13700.5 13699.0 13695.0 13697.5 13692.0 13687.0 13682.5 13684.0 13681.0 13648.0 13644.0 13622.0 13617.0 13621.0 13614.5 13616.0 13609.5 13601.5 13595.5 13598.5 13592.0 13592.5 13588.0 13586.0 13582.0 13581.0 13572.0 13575.0 13565.5 13559.0 13550.0 13545.5 13538.0 LIS Tape Veri'fication Listing Schlumberger Alaska Computing Center 15-JAN-1999 11 :~_l PAGE: 22 13542.5 13531.5 13528.0 13525.0 13524.0 13508.5 13490.0 13488.5 13470.5 13476.5 13476.0 13474 5 13470 0 13469 0 13439 5 13439 0 13404 0 13400 5 13370 0 13368.0 13349.5 13344.5 13332.0 13325.0 13322.5 13304.0 13295.5 13289.5 13281.5 13277.5 13274.0 13257.0 13246.5 13237.5 13236.0 13224 0 13217 0 13214 0 13207 5 13207 0 13191 5 13169.0 13153.5 13141.0 13140.0 13120.5 13113.0 13111.5 13091.0 13067.5 13063.0 13048.5 13028.5 13028.0 13023.5 13518.5 13482.0 13471.5 13462.5 13434.0 13363.5 13339.0 13289.5 13271.0 13232.0 13216.0 13207.0 13202.0 13142.0 13128.0 13108.5 13101.0 13022.0 13016.5 13535.5 13528.5 13518.5 13516.0 13500.0 13483.0 13473.5 13472.5 13469.0 13465.5 13432.5 13401.5 13396.0 13363.5 13345.0 13327.5 13322.5 13319.0 13299.5 13283.5 13274.5 13268.5 13251.5 13240.0 13231.0 13210.5 13199.0 13184.5 13163.0 13130.5 13105.0 13083.5 13059.5 13055.0 13039.5 13020.0 13014.0 LIS Tape Ver~'~ication Listing Schlumberger Alaska Computing Center 15-JAN-1999 11 :~cPw~ PAGE: 23 13017.0 13016.0 12992.0 12989.0 12983.5 12972.0 12949.5 12919.0 12891.5 12878.0 12861.5 12860.5 12831.0 12825.5 12820.0 12817.0 12812.0 12800.5 12776.5 12775.0 12772.0 12762.5 12757.5 12751 5 12750 5 12744 0 12737 5 12731 0 12722 5 12702 0 12700 5 12695 0 12681 0 12680 5 12656.5 12651.0 12650.0 12642.0 12640.0 12632.0 12601.5 12595.0 12575.5 12566.5 12564.5 12557.0 12549.0 12545.5 12520.5 12487.0 12482.5 12471.0 12459.0 12449.0 12444.0 13008.0 12974.5 12879.0 12849.5 12818.5 12807.5 12800.5 12766.0 12761.0 12751.0 12747.5 12738.5 12726.5 12690.5 12666.0 12637.0 12628.0 12586.5 12551.0 12535.0 12533.5 12477.0 12447.0 13010.0 12984.0 12982.0 12963.5 12938.5 12908.0 12867.5 12849.0 12818.0 1281 O. 5 12791.5 12766.5 12741.0 12732.0 12726.0 12718.0 12709.5 12691.0 12684.0 12668.5 12643.5 12636.0 12629.0 12619.0 12580.5 12562.5 12552.5 12543.5 12507.0 12472.0 12460.5 12447.5 12437.0 12430.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11 :,~,.l PAGE: 24 12442.5 12420.5 12404.0 12385.0 12376.5 12374.5 12366.5 12353.5 12324 0 12315 0 12312 0 12292 5 12281 5 12247 5 12235 0 12232 5 12225.5 12216.0 12208.5 12204.0 12179.0 12175.5 12171.0 12165.5 12156.0 12142.0 12117.0 12114.0 12110.5 12102.0 12099.5 12092.0 100.0 $ 12429.0 12364.0 12298.0 12212.0 12195.5 12192.0 12156.5 12142.0 12096.0 12078.5 86.5 12411.0 12395.0 12372.5 12360.5 12353.0 12340.5 12312.0 12302.5 12281.0 12269.0 12236.0 12223.0 12219.5 12202.5 12165.0 12160.0 12152.0 12131.0 12105.5 12103.5 12092.0 12088.5 89.0 REMARKS: THIS FILE CONTAINS CASED HOLE MCNL BORAX PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH BORAX PASS #2 AND GRCH BASE PASS #1, ALSONRAT BORAX PASS #2 ANDNRAT BASE PASS #1, CARRYING ALL MCNL CURVES WITH THE NRAT SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11 :~o~ ' PAGE: 25 TYPE REPR CODE VALUE 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN** NAME SERV UNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNT V O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 15156.500 GRCH. CNT -999.250 NRAT. CNT 14.485 CCL.CNT 84.754 DEPT. 12060.500 GRCH. CNT 25.467 NRAT. CNT -999.250 CCL.CNT -999.250 NCNT. CNT 5918. 375 FCNT. CNT NCNT. CNT -999.250 FCNT. CNT 346.313 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Veri'fication Listing Schlumberger Alaska Computing Center 15-JAN-1999 11 :"u~o~ PAGE: 26 **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.1000 FILE S~Y VENDOR TOOL CODE START DEPTH MCNL 15175.4 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO) : STOP DEPTH 12057.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAI~IA RAY MCNL MEMORY COMP NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : 15-0CT-98 RELOO35D 12070.0 15152.0 TOOL NUMBER GR MCNL 16955.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11 :'0~ ~ PAGE: 27 FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): THERMAL BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): -20 FAR COUNT RATE HIGH SCALE (CPS): 1080 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS) : 22000 TOOL STANDOFF (IN): REMARKS: Depth correlated to PDS production log dated Aug. 31, 1998 Baseline pass depth offset = 20 feet. Borax pass #1 depth offset = 24 feet. Borax pass #2 depth offset = 29 feet. 2. Ran spinner, temperature, and pressure sonde only to gather dynamic injection data during CNL passses. Pressure data was suppressed - inconsistent, spikey. 3. Descended to 16018 ft RiD initially. The only difficulty was encountered at GLM #7 at 3258'. Had to pump to gee tool centralized to pass. 4. All pumping was down the backside. Pass #1: Total pumped = 267 bbls KCL water and 135 bbls Borax. Pass #2: Total pumped = 325 bbls KCL water and 135 bbls Borax. Pass #3: Total pumped = 355 bbls KCL water and 135 bbls Borax. 5. The neutron count rates are lower on the baseline pass than on the Borax passes in upper portion of logging interval. This may be due to the early arrival of Borax on the Baseline pass. 6. Ail perforations are open. THIS FILE CONTAINS THE RAW DATA FOR BASE PASS #1. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11: 09 PAGE: 28 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT O0 000 O0 0 4 1 1 4 68 0000000000 CVEL PS1 F/HR O0 000 O0 0 4 1 1 4 68 0000000000 GR PSi GAPI O0 000 O0 0 4 1 1 4 68 0000000000 NCNT PSI CPS O0 000 O0 0 4 1 1 4 68 0000000000 FCNT PS1 CPS O0 000 O0 0 4 1 1 4 68 0000000000 NRAT PSi O0 000 O0 0 4 1 1 4 68 0000000000 CCLD PSI V O0 000 O0 0 4 1 1 4 68 0000000000 WTEP PSi DEGF O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. FCNT. PS1 15175.393 CVEL.PS1 0.000 GR.PS1 -999.250 ~T. PS1 -999.250 CCLD. PS1 -999.250 NCN~f. PS1 -999.250 -999.250 WTEP.PS! -999.250 DEPT. FCNT. PS1 12057.191 CVEL.PS1 -999.250 GR.PS1 -999.250 NCNT.PS1 -999.250 -999.250 AH~AT. PS1 -999.250 CCLD. PS1 85.000 WTEP.PS1 -999.250 * * END OF DA TA * * LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11: O~-J- PA GE: 29 **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION : O01CO1 DATE : 99/01/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.1000 FILE SUMMARY VENDOR TOOL CODE START DEPTH MCNL 15182.0 $ LOG HEADER DATA STOP DEPTH 12061.1 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR G~ RAY MCNL MEMORY COMP NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 15-0CT-98 RELOO35D 12070.0 15152.0 TOOL NUMBER GR MCNL LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11: O~-J PAGE: 3O DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 16955.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : -20 FAR COUNT RATE HIGH SCALE (CPS) : 1080 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS) : 22000 TOOL STANDOFF (IN): REMARKS Depth correlated to PDS production log dated Aug. 31, 1998 Baseline pass depth offset = 20 feet. Borax pass #1 depth offset = 24 feet. Borax pass #2 depth offset = 29 feet. 2. Ran spinner, temperature, and pressure sonde only to gather dynamic injection data during CNL passses. Pressure data was suppressed - inconsistent, spikey. 3. Descended to 16018 ftI~D initially. The only difficulty was encountered at GLM #7 at 3258'. Had to pump to get tool centralized to pass. 4. All pumping was down the backside. Pass #1: Total pumped = 267 bbls KCL water and 135 bbls Borax. Pass #2: Total pumped = 325 bbls KCL water and 135 bbls Borax. Pass #3: Total pumped = 355 bbls KCL water and 135 bbls Borax. 5. The neutron count rates are lower on the baseline pass than on the Borax passes in upper portion of logging interval. This may be due to the early arrival of Borax on the Baseline pass. 6. All perforations are open. THIS FILE CONTAINS THERAW DATA FOR BORAX PASS #1. LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11: O~~' PAGE: 31 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 5 1 1 4 68 0000000000 CVEL BX1 F/HR O0 000 O0 0 5 ! 1 4 68 0000000000 GR BX1 GAPI O0 000 O0 0 5 1 1 4 68 0000000000 NCNT BX1 CPS O0 000 O0 0 5 ! 1 4 68 0000000000 FCNT BX1 CPS O0 000 O0 0 5 1 1 4 68 0000000000 NRAT BX1 O0 000 O0 0 5 1 1 4 68 0000000000 CCLD BX1 V O0 000 O0 0 5 1 i 4 68 0000000000 WTEP BX1 DEGF O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 15182.033 CVEL.BX1 0.000 GR.BX1 -999.250 NCl~f. BX1 FCNT. BX1 -999.250 ~T.BX1 -999.250 CCLD.BX1 -999.250 WTEP.BX1 -999.250 -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11 :~-" PAGE: 32 DEPT. 12061.234 CVEL.BX1 -999.250 GR.BX1 FCNT. BX1 -999.250 ArRAT. BX1 -999.250 CCLD.BX1 -999.250 NCNT. BX1 85.000 WTEP.BX1 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION ' O01CO1 DATE · 99/01/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE ~AME : EDIT .006 SERVICE : FLIC VERSION · O01CO1 DATE · 99/01/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: 0.1000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 15186.7 12059.9 MCNL $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) 15-0CT-98 RELOO35D 12070.0 15152.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11 :t~~' PAGE: 33 VENDOR TOOL CODE TOOL TYPE GR GAbff4A RAY MCNL MEMORY COMP NEUTRON $ TOOL NUMBER GR MCNL BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : 16955.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): -20 FAR COUNT RATE HIGH SCALE (CPS): 1080 NEAR COUNT RATE LOW SCALE (CPS) : 0 NEAR COUNT RATE HICH SCALE (CPS): 22000 TOOL STANDOFF (IN): REMARKS: Depth correlated to PDS production log dated Aug. 31, 1998 Baseline pass depth offset = 20 feet. Borax pass #1 depth offset = 24 feet. Borax pass #2 depth offset = 29 feet. 2. Ran spirnqer, temperature, and pressure sonde only to gather dynamic injection data during CNL passses. Pressure data was suppressed - inconsistent, spikey. 3. Descended to 16018 ftND initially. The only difficulty was encountered at GLM #7 at 3258'. Had to pump to get tool centralized to pass. 4. Ail pumping was down the backside. Pass #1: Total pumped = 267 bbls KCL water and 135 bbls Borax. Pass #2: Total pumped = 325 bbls KCL water and 135 bbls Borax. LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-JAN-1999 11: 0~' PAGE: 34 Pass #3: Total pumped = 355 bbls KCL water and 135 bbls Borax. 5. The neutron count rates are lower on the baseline pass than on the Borax passes in upper portion of logging interval. This may be due to the early arrival of Borax on the Baseline pass. 6. All perforations are open. THIS FILE CONTAINS THE RAW DATA FOR BORAX PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 6 1 1 4 68 0000000000 CVEL BX2 F/HR O0 000 O0 0 6 i 1 4 68 0000000000 GR BX2 GAPI O0 000 O0 0 6 1 1 4 68 0000000000 NCNT BX2 CPS O0 000 O0 0 6 1 1 4 68 0000000000 FCNT BX2 CPS O0 000 O0 0 6 1 1 4 68 0000000000 NRAT BX2 O0 000 O0 0 6 1 1 4 68 0000000000 CCLD BX2 V O0 000 O0 0 6 1 1 4 68 0000000000 WTEP BX2 DEGF O0 000 O0 0 6 1 1 4 68 0000000000 * ALASKA COMPUTING CENTER * ..... WESTERN ATI.~S LOG .... * ....... £ROCESSED BY ....... ....... SCH~Ul~ERGER COMPANY NAME : BP EXPLORATION (ALASKA) WELL NAIVE : Z-38 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292287300 REFERENCE NO : 98647 LIS Tape Veri~cation Listing Schlumberger Alaska Computing Center 22-DEC-1998 10:~~ PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/12/22 ORIGIN : FLIC REEL NAME : 98647 CONTINUATION # PREVIOUS REEL : COMMENT : BP EXPLORATION, PRUDHOE BAY, Z-38, API #50-029-22873-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/12/22 ORIGIN : FLIC TAPE NAME : 98647 CONTINUATION # : 1 PREVIOUS TAPE : COF~4ENT : BP EXPLORATION, PRUDHOE BAY, Z-38, API #50-029-22873-00 TAPE HEADER PRUDHOE BAY OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: RUN1 98647 D CAIN C GODDARD TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING Z-38 500292287300 BP EXPLORATION (ALASKA) WESTERN ATLAS 21-DEC-98 RUN 2 RUN 3 .......... 19 lin 12E 4309 3948 85.20 83.70 54.80 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6. 000 7. 000 11574.0 LIS Tape Veri'~Z~ation Listing Schlumberger Alaska Computing Center 22-DEC-1998 10.~ 3RDSTRING PRODUCTION STRING REMARKS: CONTAINED HEREIN IS THE LDWG FORMATTED OPEN HOLE DIFL, BHC, ZDL, AND CN DATA AQUIRED BY WESTERN ATLAS ON BP EXPLORATION'S Z-38 WELL AND PROCESSED BY SCHLUMBERGER. THIS LOG IS THE PRIMARY DEPTH CONTROL FOR THIS WELL UNTIL THE MWD LOG IS SHIFTED TO THIS LOG. DUE TO TOOL FAILURE IN THE FIELD, THIS DATA HAS BEEN EXTENSIVELY SPLICED AND PLAYED BACK AS DESCRIBED BY COMF~VTS IN THE APPROPRIATE FILES. $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLEMAIN PASS Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data. DEPTH INCREMENT: 0.5000 FILE SO74MARY LDWG TOOL CODE BCS SDN CNT DIL $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (FIEASUREDDEPTH) START DEPTH STOP DEPTH 16982.0 11574.0 16950.0 11574.0 16950.0 11574.0 15268.0 11913.0 BASELINE DEPTH $ MERGED DATA SOURCE LDWG TOOL CODE RUN NO. SDN 1 SDN 1 CNT 1 CNT 1 BCS 1 BCS 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BCS SDN CNT DIL PASS NO. MERGE TOP MERGE BASE 1 11860.0 16950.0 2 11420.0 11680.0 1 11848.0 16950.0 2 11420.0 11705.0 1 11886.0 16982.0 2 11410.0 11703.0 LIS Tape VerifiCation Listing Schlumberger Alaska Computing Center 22-DEC-1998 10 :bLj PAGE: REMARKS: THIS FILE CONTAINS THE EDITED OPEN HOLE DATA. THE DATA HAS BEEN CLIPPED AT FIRST READING AND AT LAST READING. THE DIL, BCS, SDN, AND CNT TOOLS HAVE BEEN MERGED. PER COMP~VTS ON THE BLUELINE, THE INTERVAL 11700' TO 11810' WAS NOT LOGGED DUE TO TOOL FAILURE. DIL DATA FROM 13445' UP AND 16296' DOWN WAS REPLACED WITH RUN 2 DOWN LOG DATA DUE TO TOOL FAILURE. SDN DATA WAS REPLACED FROM 13432' UP WITH THE SAM~ RUN. BCS DATA IS FROM THE DOWN PASS 2. AS PER A CONVERSATION WITH DAVE DOUGLAS, CURVE "GRW" IS THE ORIGINAL, UNCORRECTED GR, AND "GRC" IS THE CORRECTED. FOR THE PURPOSES OF THIS EDIT, PASS 1 DATA IS ALL COUNTS BELOW 11830' AND PASS 2 IS ALL DATA ABOVE 11710'. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 19 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE ~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 194633 O0 000 O0 0 1 1 1 4 68 0000000000 GRC BCS GAPI 194633 O0 000 O0 0 1 1 1 4 68 0000000000 RHOB SDN G/C3 194633 O0 000 O0 0 1 1 1 4 68 0000000000 DRHO SDN G/C3 194633 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Veri~i~cation Listing Schlumberger Alaska Computing Center 22~DEC-1998 10:~~-~ PAGE: 4 NAME SERV UNIT SERVICE API API API API FILE NUM~ NUFi~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) NPHI CNT PU 194633 O0 000 O0 0 1 1 1 4 68 0000000000 PEF SDN 194633 O0 000 O0 0 1 1 1 4 68 0000000000 DT BCS US/F 194633 O0 000 O0 0 1 1 1 4 68 0000000000 SP SDN MV 194633 O0 000 O0 0 1 1 i 4 68 0000000000 ILD DIL OH~M194633 O0 000 O0 0 1 1 1 4 68 0000000000 ILM DIL OH~M 194633 O0 000 O0 0 1 1 1 4 68 0000000000 LL8 DIL 0H~94194633 O0 000 O0 0 1 1 1 4 68 0000000000 GRW BCS GAPI 194633 O0 000 O0 0 1 t 1 4 68 0000000000 CALl BCS IN 194633 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 16982.000 GRC. BCS -999.250 RHOB.SDN -999.250 DRHO. SDN -999.250 NPHI.CN~f -999.250 PEF. SDN -999.250 DT.BCS 60.020 SP. SDN -999.250 ILD.DIL -999.250 ILM. DIL -999.250 LL8.DIL -999.250 GRW. BCS -999.250 CAL1.BCS -999.250 DEPT. 11574.000 GRC.BCS 33.084 RHOB.SDN 2.499 DRHO. SDN 0.389 NPHI.CN~f 24.192 PEF. SDN 4.590 DT.BCS 86.896 SP.SDN -999.250 ILD.DIL -999.250 ILM. DIL -999.250 LL8.DIL -999.250 GRW. BCS -999.250 CAL1.BCS -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Veri~i~cation Listing Schlumberger Alaska Computing Center 22-DEC-1998 lO:~J~ PAGE: FILE HEADER FILE NIJMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUP~fARY LDWG TOOL CODE .............. BCS CNT $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (M~ASUREDDEPTH) START DEPTH STOP DEPTH 11574.0 11390.0 11574.0 11420.0 BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... BCS CNT REMARKS: THIS FILE CONTAINS THE EDITED CASED HOLE DATA. THE DATA HAS BEEN CLIPPED AT CASING AND AT LAST READING. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 12 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 85 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 LIS Tape Veri'2'~cation Listing Schlumberger Alaska Computing Center 22-DEC-1998 10 :~ PAGE: ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NTJMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 194633 O0 000 O0 0 2 1 1 4 68 0000000000 GRC BCS GAPI 194633 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNT PU 194633 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 11574. 000 GRC. BCS 33. 084 NPHI. CNT 24. 192 DEPT. 11400.000 GRC.BCS 29.936 NPHI. CArT -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION ' O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed byfiles for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 LIS Tape Verl~fcation Listing Schlumberger Alaska Computing Center 22-DEC-1998 10:~-j PAGE: FILE SUMFLARY VENDOR TOOL CODE START DEPTH DIFL 17052.0 BHC 17052.0 ZDL 17052.0 CNT 17052.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIM~ CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 11835.0 11835.0 11835.0 17052.0 22-JUN-98 2.0 17029.0 17015.0 11390.0 16960.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GR GAFk4A RAY 1309 GR CNT COMPENSATED NUETRON 2435 CN ZDL DENSITY 2222 ZLEC BHC COMPENSATED SONIC 1609 ELEC DIFL DUAL INDUCTION 1503 DIFL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (0H~24) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 6.000 11574.0 11574.0 SEA WATER 8.80 30.0 8.4 .. LIS Tape Ver~i"cation Listing Schlumberger Alaska Computing Center 22-DEC-1998 lO:b~~i PAGE: TOOL STANDOFF (IN): REMARKS: DIFL TOOL WAS VERIFIED ON SURFACE AFTER LOG WAS RUN, DUE TO TOOLSTRING FAILURE DOWNHOLE. FOCUS WAS DAMAGED AND IS OUT OF TOLERANCE. CALIPER WAS VERIFIED IN CASING. INTERVAL BETWEEN 11700' AND 11810' WAS NOT LOGGED DUE TO FAILURE. DIFL DATA FROM 13445' UP, AND 16296' DOWN WAS REPLACED WITH DOWN LOG DATA FROM RUN #2. ZDEN LOG DATA FROM 13432' UP WAS REPLACED WITH DOWN LOG DATA, LASO DUE TO FAILURE. BHC-AL DATA IS FROM THE SECOND DOWN PASS. TOOL STRING WAS RUN RUN ON THE BOTTOM OF DRILL PIPE. GANflVA RAY ON ORIGINAL LOGGING PASSES WAS UNREADABLE, DUE TO EXTENDED EXPOSURE TO RA SOURCES AND DOWN HOLE TEMPERATURE. GAMMA RAY PRESENTED HAS BEEN MATHEMATICALLY ALTERED BY SHIFTING AND GAINING ORIGINAL VALUE. TO BE USED FOR CORRELATION PURPOSES ONLY. THIS FILE CONTAINS THE RAW OPEN HOLE DATA FROM MAIN PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 19 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-DEC-1998 10:~ PAGE: ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB BI]MB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMiB SAMP ELEM CODE (HEX) DEPT FT 194633 O0 000 O0 0 3 1 1 4 68 0000000000 GRC BHC GAPI 194633 O0 000 O0 0 3 1 1 4 68 0000000000 ZDEN ZDL G/C3 194633 O0 000 O0 0 3 1 1 4 68 0000000000 ZCOR ZDL G/C3 194633 O0 000 O0 0 3 1 1 4 68 0000000000 CNC CN PU 194633 O0 000 O0 0 3 1 1 4 68 0000000000 PE ZDL 194633 O0 000 O0 0 3 1 1 4 68 0000000000 AC BHC US/F 194633 O0 000 O0 0 3 1 1 4 68 0000000000 SP DIFL MV 194633 O0 000 O0 0 3 1 1 4 68 0000000000 RILD DIFL OH~E4194633 O0 000 O0 0 3 1 1 4 68 0000000000 RILMDIFL 0H~4~194633 O0 000 O0 0 3 1 1 4 68 0000000000 RFOC DIFL OHT4M194633 O0 000 O0 0 3 1 1 4 68 0000000000 GRW BHC GAPI 194633 O0 000 O0 0 3 1 1 4 68 0000000000 CAL BHC IN 194633 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 17052.000 GRC. BHC -9999.000 ZDEN. ZDL -9999.000 ZCOR~ZDL CNC. CN -9999.000 PE.ZDL -9999.000 AC.BHC -9999.000 SP.DIFL RILD.DIFL -9999.000 RILM. DIFL -9999.000 RFOC.DIFL -9999.000 GRW. BHC CAL.BHC -9999.000 DEPT. 11835.000 GRC.BHC 60.180 ZDEN. ZDL 1.650 ZCOR.ZDL CNC. CN 0.000 PE.ZDL 0.000 AC.BHC 50.000 SP.DIFL RILD.DIFL 0.200 RILM. DIFL 0.200 RFOC.DIFL 0.200 GRW. BHC CAL.BHC -9999.000 -9999.000 -9999.000 -999.250 -1.500 -80.000 154.309 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Ver~'cation Listing Schlumberger Alaska Computing Center 22-DEC-1998 10:~~ PAGE: 10 **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER 4 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 2 0.5000 VENDOR TOOL CODE START DEPTH STOP DEPTH DIFL 17052.0 11835.0 BHC 17052.0 11835.0 ZDL 17052.0 11835.0 CNT 17052.0 17052.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR CNT ZDL BHC DIFL $ GAMI~A RAY COMPENSATED NUETRON DENSITY COMPENSATED SONIC DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 22-JUN-98 2.0 17029.0 17015.0 11390.0 16960.0 TOOL NUMBER 1309 GR 2435 CN 2222 ZLEC 1609 ELEC 1503 DIFL 6.000 LIS Tape Veri-~ication Listing Schlumberger Alaska Computing Center 22-DEC-1998 10 :~bs PAGE: 11 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) .. RESISTIVITY (OH~) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : 11574.0 11574.0 SEA WATER 8.80 30.0 8.4 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: DIFL TOOL WAS VERIFIED ON SURFACE AFTER LOG WAS RUN, DUE TO TOOL STRING FAILURE DOWNHOLE. FOCUS WAS DAMAGED AND IS OUT OF TOLERANCE. CALIPER WAS VERIFIED IN CASING. INTERVAL BETWEEN 11700' AND 11810' WAS NOT LOGGED DUE TO FAILURE. DIFL DATA FROM 13445' UP, AND 16296' DOWN WAS REPLACED WITH DOWN LOG DATA FROM RUN #2. ZDEN LOG DATA FROM 13432' UP WAS REPLACED WITH DOWN LOG DATA, LASO DUE TO FAILURE. BHC-AL DATA IS FROM THE SECOND DOWN PASS. TOOL STRING WAS RUN RUN ON THE BOTTOM OF DRILL PIPE. GAM~zA RAY ON ORIGINAL LOGGING PASSES WAS UNREADABLE, DUE TO EXTENDED EXPOSURE TO RA SOURCES AND DOWN HOLE TEMPERATURE. GAM~A RAY PRESENTED HAS BEEN MATHEMATICALLY ALTERED BY SHIFTING AND GAINING ORIGINAL VALUE. TO BE USED FOR CORRELATION PURPOSES ONLY. THIS FILE CONTAINS THE RAW OPEN HOLE DATA FROM MAIN PASS #2. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-DEC-1998 10 :~-~- ~ PAGE: 12 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 O. $ 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMiB SAMP ELEM CODE (HEX) DEPT FT 194633 O0 000 O0 0 4 1 1 4 68 0000000000 GRW BHC GAPI 194633 O0 000 O0 0 4 1 1 4 68 0000000000 ZDEN ZDL G/C3 194633 O0 000 O0 0 4 1 1 4 68 0000000000 ZCOR ZDL G/C3 194633 O0 000 O0 0 4 1 1 4 68 0000000000 CNC CN PU 194633 O0 000 O0 0 4 1 1 4 68 0000000000 PE ZDL 194633 O0 000 O0 0 4 1 1 4 68 0000000000 AC BHC US/F 194633 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 11711.000 GRW. BHC 99.466 ZDEN. ZDL 2.722 ZCOR.ZDL CNC. CN 8.766 PE.ZDL 6.779 AC.BHC 58.414 DEPT. 11574.000 GRW. BHC 33.084 ZDEN. ZDL 2.499 ZCOR.ZDL CNC. CN 24.192 PE. ZDL 4.590 AC.BHC 86.896 O. 047 0.389 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-DEC-1998 10:~5~' PAGE: 13 **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : DIFL $ LOG HEADER DATA FILE HEADER FILE NUMBER 5 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 15270.0 15070.0 DATE LOGGED: 22-JUN- 98 SOFTWARE VERSION: 2.0 TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : 17029.0 TD LOGGER (FT) : 17015.0 TOP LOG INTERVAL (FT) : 11390.0 BOTTOM LOG INTERVAL (FT) : 16960.0 LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GR GAi~4A RAY 1309 GR CNT COMPENSATED NUETRON 2435 CN ZDL DENSITY 2222 ZLEC BHC COMPENSATED SONIC 1609 ELEC LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE .. 14 DIFL $ DUAL INDUCTION 1503 DIFL BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6.000 11574.0 11574.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT)'. MUD CAKE AT (BHT) : SEA WATER 8.80 30.0 8.4 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STA~D, OFF (IN): REMARKS: DIFL TOOL WAS VERIFIED ON SURFACE AFTER LOG WAS RUN, DUE TO TOOL STRING FAILURE DOWNHOLE. FOCUS WAS DAMAGED AND IS OUT OF TOLERANCE. CALIPER WAS VERIFIED IN CASING. INTERVAL BETWEEN 11700' AND 11810' WAS NOT LOGGED DUE TO FAILURE. DIFL DATA FROM 13445' UP, AND 16296' DOWN WAS REPLACED WITH DOWN LOG DATA FROM RUN #2. ZDEN LOG DATA FROM 13432' UP WAS REPLACED WITH DOWN LOG DATA, LASO DUE TO FAILURE. BHC-AL DATA IS FROM THE SECOND DOWN PASS. TOOL STRING WAS RUN RUN ON THE BOTTOM OF DRILL PIPE. GAI~MA RAY ON ORIGINAL LOGGING PASSES WAS ~ABLE, DUE TO EXTENDED EXPOSURE TO RA SOURCES AND DOWN HOLE TEMPERATURE. GAM~A RAY PRESENTED HAS BEEN MATHE~b%TICALLY ALTERED BY SHIFTING AND GAINING ORIGINAL VALUE. TO BE USED FOR CORRELATION PURPOSES ONLY. LOG EDITORS NOTE: THE REPEAT PASS FOR EACH TOOL COVERS A DIFFERENT INTERVAL. THIS FILE CONTAINS THE RAW OPEN HOLE DATA FROM REPEAT PASS #1, DIFL TOOL. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-DEC-1998 10~5i PAGE: 15 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUA~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 194633 O0 000 O0 0 5 1 1 4 68 0000000000 GR DIFL GAPI 194633 O0 000 O0 0 5 1 i 4 68 0000000000 SP DIFL MV 194633 O0 000 O0 0 5 1 1 4 68 0000000000 RILD DIFL O~ 194633 O0 000 O0 0 5 1 1 4 68 0000000000 RILMDIFL 0H~194633 O0 000 O0 0 5 1 1 4 68 0000000000 RFOC DIFL 0H~4~194633 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 15270.000 GR.DIFL 45.116 SP.DIFL -999.250 RILD.DIFL -999.250 RILM. DIFL -999.250 RFOC.DIFL -999.250 DEPT. 15067.000 GR.DIFL -999.250 SP.DIFL -34.864 RILD.DIFL -999.250 RILM. DIFL -999.250 RFOC.DIFL -999.250 ** END OF DATA ** LIS Tape Verikication Listing Schlumberger Alaska Computing Center 22-DEC-1998 10 PAGE: 16 **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN AU3?~BER: 1 TOOL STRING NUMBER: 1 PASS NU~BER: 4 DEPTH INCREMENT: 0.5000 FILE SUM24ARY VENDOR TOOL CODE START DEPTH BHC $ LOG HEADER DATA DATE LOGGED: 14000.0 SOFTWARE VERSION: TIME CIRCULATION EArDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): STOP DEPTH 13800.0 22-JUN-98 2.0 17029.0 17015.0 11390.0 16960.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GR GAM~A RAY 1309 GR CNT COMPENSATED NUETRON 2435 CN ZDL DENSITY 2222 ZLEC BHC COMPENSATED SONIC 1609 ELEC LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-DEC-1998 PAGE: 17 DIFL $ DUAL INDUCTION 1503 DIFL BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : 6.000 11574.0 11574.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHF~4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : SEA WATER 8.80 30.0 8.4 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: DIFL TOOL WAS VERIFIED ON SURFACE AFTER LOG WAS RUN, DUE TO TOOL STRING FAILURE DO~VHOLE. FOCUS WAS DAMAGED AND IS OUT OF TOLERANCE. CALIPER WAS VERIFIED IN CASING. INTERVAL BETWEEN 11700' AND 11810' WAS NOT LOGGED DUE TO FAILURE. DIFL DATA FROM 13445' UP, AND 16296' DOWN WAS REPLACED WITH DOWN LOG DATA FROM RUN #2. ZDEN LOG DATA FROM 13432' UP WAS REPLACED WITH DOWN LOG DATA, LASO DUE TO FAILURE. BHC-AL DATA IS FROM THE SECOND DOWN PASS. TOOL STRING WAS RUN RUN ON THE BOTTOM OF DRILL PIPE. GAMMA RAY ON ORIGINAL LOGGING PASSES WAS UNREADABLE, DUE TO EXTENDED EXPOSURE TO RA SOURCES AND DOWN HOLE TEMPERATURE. GAM~A RAY PRESENTED HAS BEEN MATHEMATICALLY ALTERED BY SHIFTING AND GAINING ORIGINAL VALUE. TO BE USED FOR CORRELATION PURPOSES ONLY. LOG EDITORS NOTE: THE REPEAT PASS FOR EACH TOOL COVERS A DIFFERENT INTERVAL. THIS FILE CONTAINS THE RAW OPEN HOLE DATA FROM REPEAT PASS #2, BHC TOOL. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-DEC-1998 10:~''~ PAGE: 18 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 12 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 85 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 194633 O0 000 O0 0 6 1 1 4 68 0000000000 GR BHC GAPI 194633 O0 000 O0 0 6 1 1 4 68 0000000000 AC BHC US/F 194633 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 14000.000 GR.BHC 59.135 AC.BHC 75.856 DEPT. 13800.000 GR.BHC 40.467 AC. BHC 82.057 ** BArD OF DATA ** · LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-DEC-1998 10:'5~ .... PAGE: 19 **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 5 DEPTH INCR~4ENT: O. 5000 FILE SUM~zA~Y VENDOR TOOL CODE START DEPTH ZDL 13800.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 13600.0 22 -JUN-98 2.0 17029.0 17015.0 11390.0 16960.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GR GAi~LARAY 1309 GR CNT COMPENSATED NUETRON 2435 CN ZDL DENSITY 2222 ZLEC BHC COMPENSATED SONIC 1609 ELEC LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-DEC-1998 10~'~ PAGE: 2O DIFL $ DUAL INDUCTION 1503 DIFL BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6.000 11574.0 11574.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OH~) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : SEA WATER 8.80 30.0 8.4 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: DIFL TOOL WAS VERIFIED ON SURFACE AFTER LOG WAS RUN, DUE TO TOOL STRING FAILURE DOWNHOLE. FOCUS WAS DAMAGED AND IS OUT OF TOLERANCE. CALIPER WAS VERIFIED IN CASING. INTERVAL BETWEEN 11700' AND 11810' WAS NOT LOGGED DUE TO FAILURE. DIFL DATA FROM 13445' UP, AND 16296' DOWN WAS REPLACED WITH DOWN LOG DATA FROM RUN #2. ZDEN LOG DATA FROM 13432' UP WAS REPLACED WITH DOWN LOG DATA, LASO DUE TO FAILURE. BHC-AL DATA IS FROM THE SECOND DOWN PASS. TOOL STRING WAS RUN RUN ON THE BOTTOM OF DRILL PIPE. GAMMA RAY ON ORIGINAL LOGGING PASSES WAS UNREADABLE, DUE TO EXTENDED EXPOSURE TO RA SOURCES AND DOWN HOLE TEMPERA TURE. GAMMA RAY PRESENTED HAS BEEN MATHEMATICALLY ALTERED BY SHIFTING AND GAINING ORIGINAL VALUE. TO BE USED FOR CORRELATION PURPOSES ONLY. LOG EDITORS NOTE: THE REPEAT PASS FOR EACH TOOL COVERS A DIFFERENT INTERVAL. THIS FILE CONTAINS THE RAW OPEN HOLE DATA FROM REPEAT PASS #3, ZDL AND CN TOOL. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-DEC-1998 PAGE: 21 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 ? 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HEX) DEPT FT 194633 O0 000 O0 0 7 1 1 4 68 0000000000 GR ZDL GAPI 194633 O0 000 O0 0 7 1 1 4 68 0000000000 ZDEN ZDL G/C3 194633 O0 000 O0 0 7 1 1 4 68 0000000000 CNC CN PU 194633 O0 000 O0 0 7 1 1 4 68 0000000000 PE ZDL 194633 O0 000 O0 0 7 1 1 4 68 0000000000 ZCOR ZDL G/C3 194633 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 13800.000 GR.ZDL 40.467 ZDEN. ZDL PE. ZDL 2.995 ZCOR.ZDL 0.115 DEPT. 13600.000 GR.ZDL 58.698 ZDEN. ZDL PE. ZDL 2.918 ZCOR.ZDL 0.092 2.458 CNC. CN 2.455 CNC. CN 22.449 18.067 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-DEC-1998 lO:'B~b'~ PAGE: 22 **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 98/12/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 8 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE S~Y VENDOR TOOL CODE START DEPTH STOP DEPTH ZDL 11574.0 11400.0 CN 11574.0 11400.0 BHC 11574.0 11400.0 $ LOG HEADER DATA DATE LOGGED: 22-JUN-98 SOFTWARE VERSION: 2.0 TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : 17029.0 TD LOGGER (FT) : 17015.0 TOP LOG INTERVAL (FT) : 11390.0 BOTTOM LOG INTERVAL (FT) : 16960.0 LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GR GAMMA RAY 1309 GR CNT COMPENSATED NUETRON 2435 CN ZDL DENSITY 2222 ZLEC BHC COMPENSATED SONIC 1609 ELEC LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 23 DIFL $ DUAL INDUCTION 1503 DIFL BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6.000 11574.0 11574.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATtrRE (MT) MUD AT BOTTOM HOLE TEMPERATURE (BHT) MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : SEA WATER 8.80 30.0 8.4 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: DIFL TOOL WAS VERIFIED ON SURFACE AFTER LOG WAS RUN, DUE TO TOOL STRING FAILURE DOWNHOLE. FOCUS WAS DAMAGED AND IS OUT OF TOLERANCE. CALIPER WAS VERIFIED IN CASING. INTERVAL BETWEEN 11700' AND 11810' WAS NOT LOGGED DUE TO FAILURE. DIFL DATA FROM 13445' UP, AND 16296' DOWN WAS REPLACED WITH DOWN LOG DATA FROM RUN #2. ZDEN LOG DATA FROM 13432' UP WAS REPLACED WITH DOWN LOG DATA, LASO DUE TO FAILURE. BHC-AL DATA IS FROM THE SECOND DOWN PASS. TOOL STRING WAS RUN RUN ON THE BOTTOM OF DRILL PIPE. GAMMA RAY ON ORIGINAL LOGGING PASSES WAS UNREAi~ABLE, DUE TO EXTENDED EXPOSURE TO RA SOURCES AND DOWN HOLE TEMPERATURE. GAM~fA RAY PRESENTED HAS BEEN MATHEMATICALLY ALTERED BY SHIFTING AND GAINING ORIGINAL VALUE. TO BE USED FOR CORRELATION PURPOSES ONLY. THIS FILE CONTAINS THE RAW CASED HOLE DATA FROM PASS #2. $ LIS FORMAT DATA * ALASKA COMPUTING CENTER * . ............................ . ........ SC=L~ERGER ........ AUG 2 0 1998 * ............................ * · _ .............................. ~*~,~ u~ ~ G~S~0~8,' ~t8810~~ ' ' COMPANY NAME : BP EXPLORATION (ALASKA) WELL NAME : Z-38PB1 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292287370 REFERENCE NO : 98375 LIS Tape Verifiu~tion Listing Schlumberger Alaska Computing Center 13-AUG-1998 15:lb~=~j PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/07/27 ORIGIN : FLIC REEL NAME : 98375 CONTINUATION # : PREVIOUS REEL : COiV~4ENT : BP EXPLORATION, Z-38PB1, PRUDHOE BAY, API #50~029-22873-70 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/07/27 ORIGIN : FLIC TAPE NAME : 98375 CONTIArUATION # : 1 PREVIOUS TAPE : COMI4ENT · BP EXPLORATION, Z-38PB1, PRUDHOE BAY, API #50-029-22873-70 TAPE HEADER PRUDHOE BAY MWD LOG WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA SURFACE LOCATION SEC TI ON: Z-38PB1 500292287370 BP EXPLORATION (AI=ASKA) SCHLUIVi~ERGER WELL SERVICES 27-JUL-98 TOWNSHIP: RANGE: FNL: FSL: FEL: FWL : ELEVATION(FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING BIT RUN 1 BIT RUN 2 BIT RUN 3 19 liN 12E 85.20 83.70 54.80 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 9.675 3112.0 8.500 7.000 10978.0 6.000 LIS Tape Verlk~'~ation Listing Schlumberger Alaska Computing Center 13-AUG-1998 15: '-i= ..... RE~IARKS : THIS FILE CONTAINS THE LDWG FORMATTED MWD DATA AQUIRED ON BP EXPLORATION'S Z-38PB1 WELL. FOUR RUNS HAVE BEEN MERGED AND DEPTH SHIFTED. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SUN~4A~Y LDWG TOOL CODE GR $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 75.0 11769.5 75.0 11769.5 BASELINE DEPTH 88888.0 8989.5 8985.5 8972.0 8959.0 8948.5 8940.0 8935.0 8921.0 8901.0 8882.0 8866.0 8852.0 8842.0 8834.5 8815.5 8812.0 8800.0 8794.5 8790.0 .......... EQUIVALENT UNSHIFTEDDEPTH GR MWD 88893.5 8995.0 8991.5 8975.5 8962.0 8953.0 8943.5 8939.5 8925.0 8905.5 8887.5 8871.5 8857.0 8847.0 8839.0 8819.0 8816.0 8804.0 8798.0 8794.5 LIS Tape Verii.~cation Listing Schlumberger Alaska Computing Center 8787.5 8791.5 8771.5 8777.0 8768.0 8772.0 8761.5 8765.5 8739.0 8743.5 8711.0 8716.0 8703.5 8708.0 8696.0 8701.5 8689.5 8695.5 8680.5 8685.5 8675.5 8681.0 8668.5 8674.0 8663.5 8668.5 8654.5 8659.5 8641.0 8646.5 8627.5 8634.0 8625.0 863 O. 5 8622.0 8628.0 8608.0 8612.5 8599.5 8605.0 8593.5 8600.5 8583.0 8588.0 8579.5 8583.5 8578.0 8581.5 8575.0 8580.0 8571.5 8576.5 8569.0 8574.5 8567.0 8572.0 8559.5 8564.5 8556.5 8561.5 8546.0 8549.0 8536.0 8539.5 8519.5 8522.5 8509.5 8513.0 8493.0 8496.0 8483.5 8487.0 8481.5 8484.0 8475.0 8478.0 8463.0 8466.5 8454.5 8457.5 8448.0 8451.5 8438.0 8441.5 8433.0 8436.0 8427.5 8430.5 8421.5 8424.0 8418.0 8420.0 8413.0 8416.0 8408.5 8411.0 8405.0 8408.0 8397.5 8401.0 8392.0 8394.5 8387.0 8390.5 8380.0 8383.0 8373.5 8376.5 8366.5 8370.0 13-AUG-1998 15:1~ PAGE: LIS Tape Veri£~cation Listing Schlumberger Alaska Computing Center 8362.5 8360.0 8349.0 8346.0 8341.5 8330.0 8326.0 8315.0 8303.0 8297.0 8292.5 8287.0 8281.5 8276.5 8273.0 8266.0 8262.5 8250.0 8246.5 8244.0 8241.0 8235.5 8232.5 8229.5 8225.0 8219.5 8214.5 8211.5 8208.5 8202.0 8196.0 8194.0 8187.0 8182.5 8178.5 8174.5 8170.5 8166.5 8163.0 8161.0 8159.0 8153.5 8151.5 8149.0 8137.0 8135.0 8126.0 8123.5 8117.5 8112.0 8100.5 8098.5 8091.0 8085.0 8080.5 8365 0 8363 0 8352 0 8349 5 8344 5 8332 5 8329 5 8318 0 8305 5 8299.5 8295.5 8290.0 8284.0 8280.5 8276.5 8269.0 8266.0 8253.5 8249.5 8247.0 8243.5 8238.5 8234.5 8232.0 8228.0 8222.5 8218.0 8214.0 821 O . 0 8204.0 8199.0 8196.5 8189.5 8184.0 8180.0 8177.0 8172.5 8169.0 8165.5 8163.0 8161.0 8156.0 8153.5 8151.5 8139.5 8138.0 8128.5 8126.0 8121.5 8115.5 8104.5 8102.0 8093.5 8087.5 8082.5 13-AUG-1998 15:~ PAGE: 4 LIS Tape Verif~6ation Listing Schlumberger Alaska Computing Center 8072.0 8069.0 8067.5 8054.5 8049.5 8046.5 8043.5 8038.0 8035.5 8033.0 8023.0 8018.0 8016.0 8006.5 7996 5 7994 0 7982 0 7969 $ 7965 5 7952 5 7941 0 7937 0 7933.0 7930.0 7928.0 7919.0 7911.5 7899.5 7897.0 7894.5 7890.5 7885.0 7869.5 7861.5 7850.0 7848.0 7840.5 7834.5 7832.0 7828.0 7820.5 7815.5 7804.0 7795.5 7790.0 7779.0 7768 5 7764 0 7747 5 7733 5 7725 0 7722 5 7711 5 7709 0 7705.5 8074.5 8071.5 8069.5 8057.5 8051.5 8048.0 8045.5 8040.0 8037.5 8035.5 8025.0 8019.5 8017.5 8009.0 7998.5 7997.0 7985.0 7972.0 7968.0 7954.0 7942.5 7939.0 7934.5 7932.5 7930.0 7921.0 7914.0 7901 5 7898 5 7896 5 7892 5 7886 5 7872 5 7863 5 7852 5 7850 0 7843.0 7836.5 7834.0 7830.0 7823.0 7817.0 7807.0 7798.0 7793.0 7781.0 7769.5 7766.0 7749.0 7736.5 7728.0 7726.0 7714.0 7712.5 7706.5 13-AUG-1998 15:i~ PAGE: LIS Tape Veri~atiom Listing Schlumberger Alaska Computing Center 7700.0 7696.0 7692.0 7683.0 7679.5 7669.0 7666.5 7663.0 7657.0 7652.5 7648.5 7630.5 7618.5 7613.0 7609.0 7606.0 7599 5 7593 5 7582 5 7567 0 7564 5 7552 5 7548 0 7542 5 7538 5 7532.0 7530.5 7524.0 7522.0 7515.0 7510.5 7505.5 7501.5 7496.0 7492.0 7489.0 7483.0 7477.0 7473.0 7467.0 7457.0 7449.0 7442.5 7438.5 7435.5 7428.5 7426.5 7423.5 7419.5 7415.0 7411.5 7408.0 7404.5 7400.5 7398.5 7702.0 7698 5 7694 5 7685 5 7682 0 7670 5 7667 5 7663 5 7658 5 7653 5 7649.5 763 O. 5 7620.0 7614.5 7610.5 7608.5 7601.5 7594.0 7583.0 7568.5 7566.0 7554.0 7549.0 7544.0 7540.0 7533.5 7532.0 7526.0 7523.0 7516.5 7513.0 7506.5 7502.5 7497 5 7493 5 7489 5 7484 0 7477 5 7473 5 7468 0 7457 5 7449.5 7443.0 7438.0 7436.0 7429.0 7426.0 7422.5 7419.5 7415.0 7410.5 7407.5 7404.5 7400.0 7397.0 13-AUG-1998 15.'lb PAGE: LIS Tape Veri~ation Listing Schlumberger Alaska Computing Center 7392.5 7383.5 73 71.5 73 65.0 7357.5 7351.0 7338.5 7332.5 7327.0 7322.0 7313.5 7309.5 7301.0 7295.5 7293.0 7287.5 7285.0 7279.0 7274.0 7266.0 7259. $ 7254.0 7249.5 7243.5 7232.5 7222.5 7203. $ 7172.0 7167.5 7164.0 7159.5 7146.5 7141.0 7128.5 7122.0 7117.0 7112.0 7103.0 7087.5 7077.5 7072.5 7061.0 7054.5 7049.5 7031 5 7012 0 7007 5 7001 0 6990 0 6981 5 6975 5 6974 0 6966 5 6958 0 6952 5 7391.5 7383.0 7372.0 73 64.5 7357.5 7351.0 7338 5 7331 0 7324 5 7321 0 7313 5 7310 0 7301 0 7295 0 7292.0 7287 5 7284 5 7277 5 7274 5 72 65 5 7258 5 7253 5 7248 5 7242 5 7232 0 7224 0 7203 0 7172 0 7167 0 7165 0 7160 5 7146.5 7140 0 7128 0 7121 5 7116 0 7110 0 7102 5 7087 0 7078 0 7071 0 7061 0 7056.0 7050 5 7030 0 7011 5 7005 5 7000 5 6990 5 6979 5 6975 5 6973.0 6966.0 6957.0 6952.0 13-AUG-t998 15:~~' PAGE: LIS Tape Verik~cation Listing Schlumberger Alaska Computing Center 6941.5 6934.5 6920.0 6913.5 6893.5 6882.0 6870.0 6854.5 6843.5 6814.5 6808.0 6801.0 6791.0 6770.0 6722.5 6718.0 6708.0 6704 0 6691 5 6684 5 6673 0 6662 0 6653 0 6632 5 6624 5 6615 0 6604 5 6591 0 6569 0 6547 0 6535 0 6529 5 6521 0 6488 0 6473.5 64 61.5 6453.5 6446.5 6425.0 6422.0 6415.5 6408.5 6400.0 6396.0 6382.0 6374.5 6367.5 6359.0 6356.0 6352.0 6346.5 6322.5 6312.0 6308.5 6302.5 6941.0 6933.5 6919.5 6913.5 6894.0 6882.0 6870.0 6855.0 6843.5 6813.5 6806.0 6800.0 6790.5 6770.0 6726.5 6720.5 6711.0 6704.0 6692.0 6686.5 6673.0 6663.5 6653.5 6634.5 6626.0 6617.5 6604.5 6591.0 6572.5 6548.0 653 6.5 6529.5 6522.5 6489.5 6474.5 6462.5 6454.0 6447.5 6425.5 6423.5 6416.5 6410.0 6401 0 6397 0 6383 5 6375 0 63 69 0 63 60 0 6357 0 6353 5 6349 0 6324 0 6312 5 6310 0 6303.0 13-AUG-1998 15:1~--~ PAGE: LIS Tape Veri~f~C~tion Listing Schlumberger Alaska Computing Center 13-AUG-1998 15:i~~ PAGE: 6292.5 6268.5 6257.0 6250.5 6244.5 6226.5 6218.0 6191.0 6167.5 6164.0 6151 5 6142 5 6133 5 6131 0 6124 0 6110 5 6097 5 6082 0 6070 5 6064 0 6056 5 6050 0 6036 5 6015 5 5998 5 5984 0 5976.5 5965.5 5958.0 5943.0 5924.0 5907.0 5902.0 5899.5 5892.5 5875.0 6294.0 62 69.5 6260.0 6251.0 6246.0 6228.5 6219.0 6192.5 6168.5 6163.5 6150.0 6143.0 6134.5 6131.5 6125.5 6111.5 6098.0 6083.0 6069.5 6064.0 6057.0 6050.0 603 7.5 6014.5 5999.0 5984.5 5976.5 5966.0 5958.5 5942.5 5924.0 5908.0 5903.0 5901.0 5893.0 5876.0 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT LIS Tape Veri'ri~ation Listing Schlumberger Alaska Computing Center 13-AUG-1998 15:i'm-~ PAGE: 10 TYPE REPR CODE VALUE 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000 RP ~D OH~4~ O0 000 O0 0 1 1 1 4 68 0000000000 RA MWD 0H~94 O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD F/HR O0 000 O0 0 1 1 1 4 68 0000000000 FET MWD HR O0 000 O0 0 1 1 1 4 68 0000000000 GR MWD GAPI O0 000 O0 0 1 1 1 4 68 0000000000 RPXXMWD OHM~ O0 000 O0 0 1 1 1 4 68 0000000000 RPX MWD OPHV~l O0 000 O0 0 1 1 1 4 68 0000000000 RPS MWD OH~4~ O0 000 O0 0 1 1 1 4 68 0000000000 RPM MWD OH~f O0 000 O0 0 1 1 1 4 68 0000000000 RPD MWD OH~4~ O0 000 O0 0 1 1 1 4 68 0000000000 MTEMMWD DEGF O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 11769.500 RP.MWD -999.250 RA.MWD -999.250 ROP.MWD FET.MWD 22440.000 GR.MWD 77.750 RPXX. MWD 143.480 RPX.MWD RPS.MWD 128.440 RPM. MWD 117.120 RPD.MWD 109.390 MTEM.MWD DEPT. 75.000 RP.MWD -999.250 RA.MWD -999.250 ROP.MWD FET.MWD -999.250 GR.MWD 17.140 RPXX.MWD -999.250 RPX.MWD RPS.MWD -999.250 RPM. MWD -999.250 RPD.MWD -999.250 MTE~.MWD 19.330 138.170 148.100 -999.250 -999.250 -999.250 ** END OF DATA ** LIS Tape VerifiCation Listing Schlumberger Alaska Computing Center 13-AUG-1998 15:i~-~' PAGE: 11 **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NO?4BER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN ~BER: 1 DEPTH INCREMENT: O. 5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 75.0 3059.5 GR LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOF~¢ARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME) TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY $ 25-A-PR-98 IDS OB 69R MlOS/N368 REAL-TIME 11822.0 78.0 11822.0 TOOL NUMBER MiOS/N 752 LIS Tape Veri~Sation Listing Schlumberger Alaska Computing Center 13-AUG-1998 15:~'~t PAGE: 12 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 12.250 3112.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (mg/L) : FLUID LOSS (C3): RESISTIVITY (OH~) AT TEMPERATURE (DEGF) : MIID AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): SPUD MUD 30O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) '. TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REFiARKS: Ail data from downhole tool memory CDR Gamma Ray corrected for bit size and mud weight. Thank you for using Schlumberger LWD services. THIS FILE CONTAINS THE RAW DATA FOR RUN #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT LIS Tape Veri"ri~ation Listing Schlumberger Alaska Computing Center 13-AUG-i998 15:~ PAGE: 13 TYPE REPR CODE VALUE 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000 GR LW1 GAPI O0 000 O0 0 2 1 1 4 68 0000000000 ROPE LW1 F/HR O0 000 O0 0 2 1 1 4 68 0000000000 VDEP LW1 FT O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 3059.500 GR.LW1 -999.250 ROPE.LW1 72.780 VDEP.LW1 DEPT. 73.500 GR.LW1 18.150 ROPE.LW1 -999.250 VDEP.LW1 3036. 700 73. 500 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · 001C01 DATE : 98/07/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER LIS Tape Veri'k~ation Listing Schlumberger Alaska Computing Center 13-AUG-1998 15:iu-~ PAGE: 14 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SUMFL%RY VENDOR TOOL CODE START DEPTH CDR 9033.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNTIOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 294 O. 5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~fA RAY CDR COMP. P~ES. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (rog~L): FLUID LOSS (C3): RESISTIVITY (OH~k4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MIlD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): 25-APR-98 ID5 OB 69R MlOS/N368 REJLL-TIME 11822.0 78.0 11822.0 TOOL NUMBER MiOS/N 752 CDR S/N 752 8.500 11605.0 LSND 400 LIS Tape Veri~ation Listing Schlumberger Alaska Computing Center 13-AUG-1998 15:1-~ PAGE: 15 FREQUENCY (HZ): REMARKS: Ail data from downhole tool memory CDR Gamma Ray corrected for bit size and mud weight. Thank you for using Schlumberger LWD services. THIS FILE CONTAINS THE RAW DATA FOR RUN #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 3 1 1 4 68 0000000000 VDEP LW2 FT O0 000 O0 0 3 1 1 4 68 0000000000 GR LW2 GAPI O0 000 O0 0 3 1 1 4 68 0000000000 PSR LW2 OHFk~ O0 000 O0 0 3 1 1 4 68 0000000000 ATR LW2 OH~ff4 O0 000 O0 0 3 1 1 4 68 0000000000 TABR LW2 HR O0 000 O0 0 3 1 1 4 68 0000000000 TEMP LW2 DEGF O0 000 O0 0 3 1 1 4 68 0000000000 ROPE LW2 F/HR O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** LIS Tape VerifiCation Listing Schlumberger Alaska Computing Center 13-AUG-1998 15 :~- PAGE: 16 DEPT. 11605.000 VDEP.LW2 -999.250 GR.LW2 -999.250 ATR.LW2 -999.250 TABR.LW2 -999.250 TEMP.LW2 -999.250 DEPT. 2941. 000 VDEP. LW2 ATR. LW2 O. 210 TABR. LW2 2941. 000 GR. LW2 O . 000 TEMP. LW2 45.590 73. 400 PSR . LW2 ROPE. LW2 PSR. LW2 ROPE. LW2 -999.250 -999.250 5.020 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE . FLIC VERSION : O01CO1 DATE · 98/07/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE : 98/07/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMEN~f: O. 5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH CDR 11605.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): STOP DEPTH 9033.0 25-APR-98 ID5 OB 69R MlOS/N368 REAL-TIME 11822.0 78.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-AUG-1998 15:~~ PAGE: 17 BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 11822.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CDR COMP. RES. $ TOOL NUMBER MiOS/N 752 CDR S/N 752 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 8.500 11605.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (mg/L) : FLUID LOSS (C3): RESISTIVITY (OHF~f) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE-: MUD FILTRATE AT (MT): MUD CAKE AT (MT): LSND 400 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Ail data from downhole tool memory CDR Gamma Ray corrected for bit size and mud weight. Thank you for using Schlumberger LWD services. THIS FILE CONTAINS THERAW DATA FOR RUN #3. $ LIS FORMAT DATA LIS Tape Veri~'f~ation Listing Schlumberger Alaska Computing Center 13-AUG-1998 15:iL~' PAGE: 18 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HEX) DEPT FT O0 000 O0 0 4 1 1 4 68 0000000000 VDEP LW3 FT O0 000 O0 0 4 1 1 4 68 0000000000 GR LW3 GAPI O0 000 O0 0 4 1 1 4 68 0000000000 PSR LW3 OH~M O0 000 O0 0 4 1 1 4 68 0000000000 ATR LW3 OH~M O0 000 O0 0 4 1 1 4 68 0000000000 TABR LW3 HR O0 000 O0 0 4 1 1 4 68 0000000000 TEMP LW3 DEGF O0 000 O0 0 4 1 1 4 68 0000000000 ROPE LW3 F/HR O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. ATR.LW3 11605.000 VDEP.LW3 8749.711 GR.LW3 -999.250 PSR.LW3 -999.250 -999.250 TABR.LW3 -999.250 TEMP.LW3 -999.250 ROPE.LW3 78.260 ** END OF DATA ** LIS Tape Verl~-~ation Listing Schlumberger Alaska Computing Center 13-AUG-1998 15 :l-~J" PAGE: 19 **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/07/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION ' O01CO1 DATE : 98/07/27 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEAl,ER FILE Nt~4BER 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: O. 5000 FILE SUlV~4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 11821.5 11550.0 CDR $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWN~OLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GA14MA RAY IMP IMPULSE $ 25-APR-98 ID5 OB 69R Mi OS/N3 68 REAL - TIME 11822.0 78.0 11822.0 TOOL NTJlViBER MiOS/N 752 IMPULSE-475 LIS Tape Verification Listing Schlumberger Alaska Computing Center 13-AUG-1998 15:i-~--~ PAGE: 2O BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): 8.500 11605.0 BOREHOLE CO~ITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (rog~L): FLUID LOSS (C3): RESISTIVITY (OH~) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): 6% KCL 39000 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Ail data from downhole tool memory CDR Gamma Ray corrected for bit size and mud weight. Thank you for using Schlumberger LWD services. THIS FILE CONTAINS THE RAW DATA FOR RUN #4. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 16 12 68 13 66 0 LIS Tape Veri~-£~ation Listing Schlumberger Alaska Computing Center 13-AUG-1998 PAGE: 21 TYPE REPR CODE VALUE 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 5 1 1 4 68 0000000000 VDEP LW4 FT O0 000 O0 0 5 1 1 4 68 0000000000 GR LW4 GAPI O0 000 O0 0 5 1 1 4 68 0000000000 PlOH LW4 Otflv~4 O0 000 O0 0 5 1 1 4 68 0000000000 P16H LW4 OH~ff4 O0 000 O0 0 5 1 1 4 68 0000000000 P22H LW4 Otff4M O0 000 O0 0 5 1 1 4 68 0000000000 P28H LW4 OH~M O0 000 O0 0 5 1 1 4 68 0000000000 P34H LW4 Ot{~ff4 O0 000 O0 0 5 1 1 4 68 0000000000 AiOH LW4 0I~4~I O0 000 O0 0 5 1 1 4 68 0000000000 A16H LW4 OH~ff4 O0 000 O0 0 5 1 1 4 68 0000000000 A22H LW4 OH~ff4 O0 000 O0 0 5 1 1 4 68 0000000000 A28H LW4 OH~IM O0 000 O0 0 5 1 1 4 68 0000000000 A34H LW4 OH~k4 O0 000 O0 0 5 1 1 4 68 0000000000 TABR LW4 HR O0 000 O0 0 5 1 1 4 68 0000000000 TEMP LW4 DEGF O0 000 O0 0 5 1 1 4 68 0000000000 ROPE LW4 F/HR O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 11821. 500 VDEP. LW4 8890. 301 GR. LW4 -999. 250 PIOH. LW4 P16H. LW4 -999. 250 P22H. LW4 -999. 250 P28H. LW4 -999. 250 P34H. LW4 AiOH. LW4 -999.250 A16H. LW4 -999.250 A22H. LW4 -999.250 A28H. LW4 A34H. LW4 -999.250 TABR.LW4 -999.250 TEMP.LW4 -999.250 ROPE. LW4 DEPT. 11550. 000 VDEP.LW4 8713. 811 GR.LW4 113. 120 P!OH.LW4 P16H. LW4 O. 280 P22H. LW4 O. 420 P28H. LW4 O. 670 P34H. LW4 AiOH. LW4 0.300 A16H.LW4 0.490 A22H. LW4 0.720 A28H. LW4 A34H. LW4 1 . 090 TABR. LW4 -999. 250 TEMP. LW4 148.1 O0 ROPE. LW4 -999.250 -999.250 -999.250 5.570 0.210 1.190 0.900 -999.250 ** END OF DATA ** * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... COMPANY NAME WELL NAME FIELD NAME BOROUGH STATE API NUMBER REFERENCE NO BP EXPLORATION (ALASKA), INC. Z-38 PB1 PRUDHOE BAY NORTH SLOPE ALASKA 500292287370 98247 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:~-" PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/05/26 ORIGIN : FLIC REEL NAME : 98247 CONTINUATION # : PREVIOUS REEL : COGENT : BP EXPLORATION, Z-38 PB1, PRUDHOE BAY, API #50-029-22873-70 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/05/26 ORIGIN : FLIC TAPE NAME : 98247 CONTINUATION # : 1 PREVIOUS TAPE COf4~ENT '. BP EXPLORATION, Z-38 PB1, PRUDHOE BAY, API #50-029-22873-70 TAPE HEADER PRUDHOE BAY OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL '. FSL: FEL: FWL : ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING Z-38 PB1 500292287370 BP EXPLORATION (ALASKA), INC. SCHLUMBERGER WELL SERVICES 26-MAY-98 RUN1 98247 V. LOMAX W. STAFFORD RUN 2 RUN 3 .......... 19 liN 12E 4309 3948 83.70 54.80 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8. 500 9. 625 3101.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:~.~ '~ 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: THIS TAPE CONTAINS THE LDWG FORMATTED OPEN HOLE DATA AQUIRED ON BP EXPLORATION'S Z-38 PB1 WELL. THIS GR IS THE PRIMARY DEPTH CONTROL. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE ArUMBER: 1 EDITED OPEN HOLE MAIN PASS Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data. DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE AIT CNT SDN $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 9028.0 3108.0 9004.0 3101.0 9018.0 3101.0 BASELINE DEPTH $ MERGED DATA SOURCE LDWG TOOL CODE $ REMARKS: THIS FILE CONTAINS THE EDITED OPEN HOLE DATA. IT HAS BEEN DECIMATED TO .5' SAMPLE RATE AND CLIPPED AT FIRST READING ANDAT CASING. $ .......... EQUIVALENT UNSHIFTED DEPTH .......... A I T CNT S DN RUN NO. PASS NO. MERGE TOP MERGE BASE LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:.~~ PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 112 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 9 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 GR AIT GAPI 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 SP AIT MV 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 TENS AIT LB 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 TEND AIT LB 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 MRES AIT OPHCk41197045 O0 000 O0 0 1 1 1 4 68 0000000000 MTEMAIT DEGF 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 DEV AIT DEG 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNT CPS 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNT CPS 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNT CPS 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNT CPS 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNT 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNT PU-S 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 CPHI CNT PU-S 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 CALI SDN IN 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 DRHO SDN G/C3 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 PEF SDN BN/E 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 RHOB SDN G/C3 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 MSFL SDN 0H~941197045 O0 000 O0 0 1 1 1 4 68 0000000000 MINVSDN 0B74~Ii197045 O0 000 O0 0 1 1 1 4 68 0000000000 ~4NORSDN 0H~94 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 AFiO AIT OH~4Ml197045 O0 000 O0 0 1 1 1 4 68 0000000000 AF20 AIT 0PH~41197045 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) AF30 AIT 0H~1197045 O0 000 O0 0 1 1 1 4 68 0000000000 AF60 AIT 0H~1197045 O0 000 O0 0 1 I 1 4 68 0000000000 AF90 AIT 0H~4~1197045 O0 000 O0 0 1 1 1 4 68 0000000000 DT DAS US/F 1197045 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 9036.000 GR.AIT -999.250 SP.AIT -45.188 TENS.AIT TEND.AIT 654.407 ~ES.AIT -999.250 MTEM. AIT -999.250 DEV. AIT CNTC. CNT -999.250 CFTC. CNT -999.250 FCNT. CNT -999.250 NCNT~CNT NRAT. CNT -999.250 NPHI.CNT -999.250 CPHI.CNT -999.250 CALI.SDN DRHO.SDN -999.250 PEF. SDN -999.250 RHOB.SDN -999.250 MSFL.SDN MINV. SDN -999.250 ~INOR.SDN -999.250 AFiO.AIT -999.250 AF20.AIT AF30.AIT -999.250 AF60.AIT -999.250 AF90.AIT -999.250 DT.DAS DEPT. 3101.000 GR.AIT TEND.AIT 765.186 M~ES.AIT CNTC. CNT 1527.533 CFTC. CNT NRAT. CNT 4.880 NPHI.CNT DRHO.SDN 0.781 PEF. SDN MINV. SDN 0.667 ~NOR.SDN AF30.AIT -999.250 AF60.AIT 60. 301 1 712 385 339 51 102 8 869 0 403 -999 250 SP.AIT -61.250 TENS.AIT MTEM. AIT 83.955 DEV. AIT FCNT. CNT 377.432 NCNT. CNT CPHI. CNT 50.166 CALI.SDN RHOB.SDN 3.707 MSFL.SDN AFiO.AIT -999.250 AF20.AIT AF90.AIT -999.250 DT. DAS 4730.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 2519.000 20.828 1429.659 8.752 0.561 -999.250 141.100 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION . O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08{~-~ PAGE: FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE .............. AIT CNT $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 3101.0 2948.0 3101.0 2948. 0 BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... AIT CNT REMARKS: THIS FILE CONTAINS THE EDITED CASED HOLE DATA. THE DATA HAS BEEN DECIMATED TO 0.5' SAMPLE RATE AND CLIPPED AT CASING AND AT LAST READING. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 19 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:'~ .... PAGE .. 6 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1197045 O0 000 O0 0 2 1 1 4 68 0000000000 TENS AIT LB 1197045 O0 000 O0 0 2 1 1 4 68 0000000000 TEND AIT LB 1197045 O0 000 O0 0 2 1 1 4 68 0000000000 MTEMAIT DEGF 1197045 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH AIT GAPI 1197045 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNT CPS 1197045 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNT CPS 1197045 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNT CPS 1197045 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNT CPS 1197045 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNT 1197045 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNT 1197045 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNT PU-S 1197045 O0 000 O0 0 2 1 1 4 68 0000000000 CPHI CNT PU-S 1197045 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 3101.000 TENS.AIT 2519.000 TEND.AIT GRCH.AIT 60.301 CNTC. CNT 1527.533 CFTC. CNT NCNT. CNT 1429.659 CRAT. CNT 4.153 NRAT. CNT CPHI.CNT 50.166 DEPT. 2948.000 TENS.AIT 2442.000 TEND.AIT GRCH.AIT 44.163 CNTC. CNT 1362.954 CFTC. CNT NCNT. CNT 1316.685 CRAT. CNT 4.172 NRAT. CNT CPHI.CNT 50.156 765.186 MTEM. AIT 385.339 FCNT. CNT 4.880 NPHI.CNT 775.316 MTEM.AIT 343.901 FCNT. CNT 4.387 NPHI.CNT 83.955 377.432 51.102 82. 698 343. 403 49. 369 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:L%-.- PAGE: **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SDT~4ARY VENDOR TOOL CODE START DEPTH AIT 9046.0 PEX 9046.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION EArDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH .......... 3101.0 3101.0 21 -APR-98 8Cl -205 1300 21 -APR-98 2251 21 -APR-98 9033.0 9036.0 2948.0 9028.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GA~ff~A RAY CNT COMPENSATED NEUTRON AIT ARRAY INDUCTION $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): TOOL NUMBER HGR HCNT AIT-H 8.500 3101.0 3102.0 BOREHOLE CONDITIONS LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:b=.~ PAGE: MUD TYPE: LSND MUD DENSITY (LB/G): 10.30 MUD VISCOSITY (S) : 4 6.0 MUD PH: 9.1 FLUID LOSS (C3): 5.2 MAXIMUM RECORDED TEMPERATURE (DEGF) : 212.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): 1.710 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 1. 910 MUD CAKE AT (BHT) : 62.0 62.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: NABORS 18E. PULLED TIGHT REPEATEDLY BELOW AND UP TO 6000'. THIS FILE CONTAINS THE RAW OPEN HOLE DATA AQUIRED AT 0.5 SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 14 12 68 13 66 0 14 65 FT 15 66 68 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08: t~= ~ PAGE: TYPE REPR CODE VALUE 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CI~SS MOD lVTjlVlB SAMP ELE~ CODE (HEX) DEPT FT 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 GR AIT GAPI 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 SP AIT MV 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 TENS AIT LB 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 HTEN AIT LB 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 MRES AIT 0H~II197045 O0 000 O0 0 3 1 1 4 68 0000000000 MTEMAIT DEGF 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 GDEV AIT DEG 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC PEX CPS 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC PEX CPS 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 RCFT PEX CPS 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 RCNT PEX CPS 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 TNRA PEX 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 RTNR PEX 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 TNPH PEX PU 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI PEX PU 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 NPOR PEX PU 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 DT BCS US/F 1197045 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 9046.000 GR.AIT 132.168 SP.AIT -45.000 TENS.AIT HTEN. AIT 25.766 MRES.AIT 0.944 MTEM. AIT 139.244 GDEV. AIT CNTC.PEX 2247.915 CFTC.PEX 591.105 RCFT. PEX 547.934 RCNT. PEX TNRA.PEX 3.848 RTNR.PEX 4.040 TNPH. PEX 47.680 NPHI.PEX NPOR.PEX 46.915 DT. BCS 86.300 DEPT. 3101.000 GR.AIT 60.301 SP.AIT -61.250 TENS.AIT HTEN. AIT 765.186 ~ES.AIT 1.712 MTEM. AIT 83.955 GDEV. AIT CNTC. PEX 1527.533 CFTC. PEX 385.339 RCFT. PEX 377.432 RCNT. PEX TNRA.PEX 4.153 RTNR.PEX 4.880 TNPH. PEX 50.166 NPHI.PEX NPOR.PEX 51.102 DT. BCS 141.100 2800.000 -999.250 2171.919 51.521 2519.000 20.828 1429.659 54.800 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08 :'~- PAGE: 10 **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE RUN N[~4BER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SOTf4ARY FILE HEADER FILE ~FUMBER 4 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 1 0.2500 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 9046.0 3101.0 PEX 9046.0 3101.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GANff4A RAY 21 -APR-98 8Cl -205 1300 21 -APR-98 2251 21 -APR-98 9033.0 9036.0 2948.0 9028.0 TOOL NUMBER HGR LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:b~~- PAGE: 11 CNT AIT $ COMPENSATED NEUTRON ARRAY INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) '. LOGGERS CASING DEPTH (FT) : HCNT AIT-H 8.500 3101.0 3102.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10. 30 MUD VISCOSITY (S) : 46.0 MUD PH: 9.1 FLUID LOSS (C3): 5.2 MAXIMUM RECORDED TEMPERATURE (DEGF) : 212.0 RESISTIVITY (OH~ff~) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): 1. 710 MUD FILTRATE AT (BHT) : MUD CAF~E AT (MT): 1. 910 MUD CAKE AT (BHT): 62.0 62.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) .. THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN) '. REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: NABORS 18E. PULLED TIGHT REPEATEDLY BELOW AND UP TO 6000'. THIS FILE CONTAINS THE RAW OPEN HOLE DATA AQUIRED AT 0.25 SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 PAGE: 12 TYPE REPR CODE VALUE 5 66 6 73 7 65 8 68 0.25 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE AU3M~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1197045 O0 000 O0 0 4 1 1 4 68 0000000000 AFiO AIT OHlV~Il197045 O0 000 O0 0 4 1 1 4 68 0000000000 AF20 AIT OHFk41197045 O0 000 O0 0 4 1 1 4 68 0000000000 AF30 AIT 0HM~II197045 O0 000 O0 0 4 1 1 4 68 0000000000 AF60 AIT 0H~941197045 O0 000 O0 0 4 1 1 4 68 0000000000 AF90 AIT 0H~941197045 O0 000 O0 0 4 1 1 4 68 0000000000 ATiO AIT OH~ff41197045 O0 000 O0 0 4 1 1 4 68 0000000000 AT20 AIT 0H~941197045 O0 000 O0 0 4 1 1 4 68 0000000000 AT30 AIT 0HF~Ii197045 O0 000 O0 0 4 1 1 4 68 0000000000 AT60 AIT 014P941197045 O0 000 O0 0 4 1 1 4 68 0000000000 AT90 AIT 0HN~41197045 O0 000 O0 0 4 1 1 4 68 0000000000 AOIO AIT OHYk41197045 O0 000 O0 0 4 1 1 4 68 0000000000 A020 AIT 0PH~Ii197045 O0 000 O0 0 4 1 1 4 68 0000000000 A030 AIT 0H1~Ii197045 O0 000 O0 0 4 1 1 4 68 0000000000 A060 AIT 0H~941197045 O0 000 O0 0 4 1 1 4 68 0000000000 A090 AIT 0H~4~1197045 O0 000 O0 0 4 1 1 4 68 0000000000 AIBD AIT IN 1197045 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 9046.000 AFiO.AIT 3.117 A~20.AIT 3.543 AF30.AIT AF60.AIT 3.382 AF90.AIT 3.255 ATiO.AIT 3.117 AT20.AIT AT30.AIT 3.464 AT60.AIT 3.392 AT90.AIT 3.252 AOiO.AIT AO20.AIT 3.544 AO30.AIT 3.442 AO60.AIT 3.373 AO90.AIT AIBD.AIT 7.000 DEPT. 3108.000 AFiO.AIT 6.115 AF20.AIT 7.736 AF30.AIT AF60.AIT 9.026 AF90.AIT 9.359 ATiO.AIT 6.373 AT20.AIT AT30.AIT 8.213 AT60.AIT 9.540 AT90.AIT 9.902 AOiO.AIT AO20.AIT 8.070 AO30.AIT 8.304 AO60.AIT 9.068 AO90.AIT AIBD.AIT 11.876 3.469 3.543 3.117 3.274 8.304 8.484 6.645 9.426 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:"~,? PAGE: 13 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE AUJMBER 5 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 1 0.1667 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 9046.0 3101 . 0 PEX 9046.0 3101.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : 21 -APR-98 8Cl -205 1300 21-APR-98 2251 21 -APR-98 9033.0 9036.0 2948.0 9028.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:~~ PAGE: 14 LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CNT COMPENSATED NEUTRON AIT ARRAY INDUCTION $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~ff~) AT TEMPERATURE (DEGF) : MUD AT MEASURED T~PERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) '. MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): TOOL NUMBER HGR HCNT AIT-H 8.500 3101.0 3102.0 LSND 10.30 46.0 9.1 5.2 212.0 1. 710 62.0 1. 910 62.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: NABORS 18E. PULLED TIGHT REPEATEDLY BELOW AND UP TO 6000'. THIS FILE CONTAINS THERAW OPEN HOLE DATA AQUIRED AT 0.1667 SAMPLERATE. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:'~~ PAGE: 15 ** DATA FORJVL~T SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) O0 000 O0 0 5 1 1 4 68 0000000000 DEPT FT 1197045 TT3 PEX US 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 TT4 PEX US 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 TT1 PEX US 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 TT2 PEX US 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 HDRA PEX G/C3 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 PEFZ PEX 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 PEF8 PEX 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 RHOZ PEX G/C3 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 RH08 PEX G/C3 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 HMIN PEX OP~4M 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 H~NO PEX OP~4Ml197045 O0 000 O0 0 5 1 1 4 68 0000000000 RXOZ PEX OPi~M 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 RX08 PEX OHMM 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 HCNT PEX CPS 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 HCFT PEX CPS 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 HGR PEX GAPI 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 RHFT PEX CPS 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 RHNT PEX CPS 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 DPHZ PEX PU 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 HTNP PEX PU 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 HNPO PEX PU 1197045 O0 000 O0 0 5 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:"0~3-' PAGE: 16 ** DATA ** DEPT. 9046. 000 TT3. PEX TT2 . PEX 417.600 HDRA. PEX RHOZ.PEX -999.250 RHO8.PEX RXOZ. PEX 1.803 RXO8 . PEX HGR.PEX 132.168 RHFT. PEX HTNP. PEX 47. 680 HNPO. PEX DEPT. TT2.PEX RHOZ.PEX RXOZ.PEX HGR.PEX HTNP.PEX 3101 000 531 200 3 707 0 561 58 606 50 161 TT3 . PEX HDRA. PEX RH08 . PEX RX08. PEX RHFT. PEX HNPO. PEX 762.800 TT4.PEX -999.250 PEFZ.PEX -999.250 Iff4IN. PEX 1.819 HCNT.PEX 547.934 RHNT. PEX 46.915 1060.000 TT4.P~ 0.781 PEFZ.PEX 3.648 P~4IN. PEX 0.450 HCNT. PEX 358.069 RHNT.PEX 48.622 568.000 TT1.PEX -999.250 PEF8.PEX 1.493 H~iNO. PEX 2247.915 HCFT. PEX 2171.919 DPHZ.PEX 795.600 TT1.PEX 8.869 PEF8.PEX 0.667 HMNO.PEX 1527.151 HCFT. PEX 1496.256 DPHZ.PEX 612.400 -999.250 1.467 591.105 60721.211 806.000 9.431 0.403 385.267 -64.052 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION · O01CO1 DATE · 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NTJMBER 6 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed byfiles for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.0833 FILE SO?4~zARY LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:'~0~' PAGE: 17 VENDOR TOOL CODE START DEPTH AIT 9046.0 PEX 9046.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 3101.0 3101.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CNT COMPENSATED NEUTRON AIT ARRAY INDUCTION $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (Otff4M) AT TEMPERATURE (DEGF) '. MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: NABORS 18E. 21 -APR-98 8Cl -205 1300 21 -APR-98 2251 21 -APR-98 9033.0 9036.0 2948.0 9028.0 TOOL NUMBER ........... HGR HCNT AIT-H 8.500 3101.0 3102.0 LSND 10.30 46.0 9.1 5.2 212.0 1.710 62.0 1. 910 62.0 THERMAL SANDSTONE 2.65 -. LIS Tape Verification Listing Schlumberger Alaska Computing Center ~ e 27-MAY-1998 08:03 PAGE: 18 PULLED TIGHT REPEATEDLY BELOW AND UP TO 6000'. THIS FILE CONTAINS THE RAW OPEN HOLE DATA AQUIRED AT O. 0833 SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NO-MB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1197045 O0 000 O0 0 6 1 1 4 68 0000000000 HCAL PEX IN 1197045 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 9046.000 HCAL.PEX 7.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:03 PAGE: 19 **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE · FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE StC4MARY VENDOR TOOL CODE START DEPTH AIT 9146.0 PEX 9146.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 8682.0 8682.0 21 -APR-98 8C1-205 1300 21 -APR-98 2251 21 -APR-98 9033.0 9036.0 2948.0 9028.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GA~k4A RAY CNT COMPENSATED NEUTRON AIT ARRAY INDUCTION TOOL NUMBER HGR HCNT AIT-H LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:03 PAGE: 20 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 8.500 3101.0 3102.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10. 30 MUD VISCOSITY (S) : 46.0 MUD PH: 9.1 FLUID LOSS (C3): 5.2 MAXIMUM RECORDED TEMPERATURE (DEGF): 212.0 RESISTIVITY (OH~4M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): 1. 710 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 1.910 MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN) REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: NABORS 18E. PULLED TIGHT REPEATEDLY BELOW AND UP TO 6000 '. THIS FILE CONTAINS THE REPEAT DATA AQUIRED AT O . 5 ' SAMPLE RATE. $ LIS FORMAT DATA 62.0 62. 0 ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 4 66 1 5 66 6 73 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08: 03 PAGE: 21 TYPE REPR CODE VALUE 7 65 8 68 0.5 9 65 FT 11 66 14 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE ~ ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1197045 O0 000 O0 0 7 1 1 4 68 TENS AIT LB 1197045 O0 000 O0 0 7 1 1 4 68 HTEN AIT LB 1197045 O0 000 O0 0 7 1 1 4 68 MTEMAIT DEGF 1197045 O0 000 O0 0 7 1 1 4 68 MRES AIT 0tfl~Ii197045 O0 000 O0 0 7 1 1 4 68 DEVI AIT DEG 1197045 O0 000 O0 0 7 1 1 4 68 GR AIT GAPI 1197045 O0 000 O0 0 7 1 1 4 68 SP AIT MV 1197045 O0 000 O0 0 7 1 1 4 68 DT PEX US/F 1197045 O0 000 O0 0 7 1 1 4 68 NPOR PEX PU 1197045 O0 000 O0 0 7 1 1 4 68 NPHI PEX PU 1197045 O0 000 O0 0 7 1 1 4 68 TNPH PEX PU 1197045 O0 000 O0 0 7 1 1 4 68 TNRA PEX 1197045 O0 000 O0 0 7 1 1 4 68 RTNR PEX 1197045 O0 000 O0 0 7 1 1 4 68 CNTC PEX CPS 1197045 O0 000 O0 0 7 1 1 4 68 CFTC PEX CPS 1197045 O0 000 O0 0 7 1 1 4 68 RCNT PEX CPS 1197045 O0 000 O0 0 7 1 1 4 68 RCFT PEX CPS 1197045 O0 000 O0 0 7 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ** DATA ** DEPT, 9146.000 TENS.AIT 1456.000 HTEN. AIT -450.494 MTEM. AIT MRES,AIT 1.007 DEVI.AIT -999.250 GR.AIT 110.140 SP.AIT DT, PEX 79.600 NPOR.PEX 45.945 NPHI.PEX 50.799 TNPH. PEX TNRA,PEX 3.793 RTNR.PEX 3.983 CNTC.PEX 2150.532 CFTC. PEX RCNT, PEX 2079.203 RCFT. PEX 533.024 DEPT. 8682.000 TENS.AIT 4218.000 HTEN. AIT 564.128 MTE~.AIT MRES.AIT 0.994 DEVI,AIT 50.706 GR.AIT 71.006 SP.AIT DT. PEX 79.200 NPOR.PEX 28.833 NPHI.PEX 31.509 TNPH. PEX TNRA.PEX 2.779 RTNR.PEX 3.200 CNTC.PEX 2648.203 CFTC. PEX RCNT. PEX 2389.169 RCFT. PEX 715,148 135.122 -45.000 46.732 574.252 138.952 -145.375 32.533 923.904 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:~' PAGE: 22 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE · FLIC VERSION · O01CO1 DATE · 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE · FLIC VERSION · O01CO1 DATE · 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUNk~Y FILE HEADER FILE NUMBER 8 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. 1 1 2 O. 2500 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 9146.0 8682.0 PEX 9146.0 8682.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : 21 -APR-98 8Cl -205 1300 21 -APR-98 2251 21 -APR-98 9033.0 9036.0 2948.0 9028.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:03 PAGE: 23 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GA~94A RAY CNT COMPENSATED NEUTRON AIT ARRAY INDUCTION $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : TOOL NUMBER HGR HCNT AIT-H 8.500 3101.0 3102.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10.30 MUD VISCOSITY (S) : 46.0 MUD PH: 9.1 FLUID LOSS (C3): 5.2 MAXIMUM RECORDED TEMPERATURE (DECF): 212.0 RESISTIVITY (Ot~4M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): 1.710 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 1. 910 MUD CAKE AT (BHT): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : THERMAL MA TRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: NABORS 18E. PULLED TIGHT REPEATEDLY BELOW AND UP TO 6000'. THIS FILE CONTAINS THE REPEAT DATA AQUIRED AT 0.25' SAMPLE RATE. $ LIS FORMAT DATA 62.0 62.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:~~ PAGE: 24 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 5 66 6 73 7 65 8 68 0.25 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1197045 O0 000 O0 0 8 1 1 4 68 0000000000 AFiO AIT 0H~4~1197045 O0 000 O0 0 8 1 1 4 68 0000000000 AF20 AIT OH~4Ml197045 O0 000 O0 0 8 1 1 4 68 0000000000 AF30 AIT 0H~11197045 O0 000 O0 0 8 1 1 4 68 0000000000 AF60 AIT OHI~Ml197045 O0 000 O0 0 8 1 1 4 68 0000000000 AF90 AIT OH~k41197045 O0 000 O0 0 8 1 1 4 68 0000000000 AFiO AIT OH~k41197045 O0 000 O0 0 8 1 1 4 68 0000000000 AF20 AIT 0Ifl~41197045 O0 000 O0 0 8 1 1 4 68 0000000000 AF30 AIT OPffvfl~l197045 O0 000 O0 0 8 1 1 4 68 0000000000 AF60 AIT Otflvfl~ll9704$ O0 000 O0 0 8 1 1 4 68 0000000000 AF90 AIT OH~4Ml197045 O0 000 O0 0 8 1 1 4 68 0000000000 AFiO AIT OHMMl197045 O0 000 O0 0 8 1 1 4 68 0000000000 AF20 AIT 0H~4~1197045 O0 000 O0 0 8 1 1 4 68 0000000000 AF30 AIT 0H~41197045 O0 000 O0 0 8 1 1 4 68 0000000000 AF60 AIT OHMMl197045 O0 000 O0 0 8 1 1 4 68 0000000000 AF90 AIT OHMMl197045 O0 000 O0 0 8 1 1 4 68 0000000000 AIBD AIT IN 1197045 O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** DEPT. 9146.000 AFiO.AIT 2.994 AF20.AIT 3.448 AF30.AIT AF60.AIT 3.412 AF90.AIT 3.276 AFiO.AIT 2.994 AF20.AIT AF30.AIT 3.421 AF60.AIT 3.427 AF90.AIT 3.272 AFiO.AIT AF20.AIT 3.448 AF30.AIT 3.397 AF60.AIT 3.409 AF90.AIT 3.441 3.447 2.994 3.293 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:~ PAGE: 25 AIBD.AIT 6.744 DEPT. 8682.250 AFiO.AIT AF60.AIT 4.639 AF90.AIT AF30.AIT 5.087 AF60.AIT AF20.AIT 5.288 AF30.AIT AIBD.AIT 7.535 4.513 AF20.AIT 4.443 AFiO.AIT 4.891 AF90.AIT 4.975 AF60.AIT 4.861 AF30.AIT 4.807 AF20.AIT 4.650 AFiO.AIT 4.455 AF90.AIT 4. 748 5.291 4. 767 4.313 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE . FLIC VERSION . O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE StC~4ARY FILE HEADER FILE NUMBER 9 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. 1 1 2 0.1667 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 9146.0 8682.0 PEX 9146.0 8682.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: 21 -APR-98 8Cl -205 1300 21-APR-98 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:~ PAGE: 26 TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAb~IA RAY CNT COMPENSATED NEUTRON AIT ARRAY INDUCTION $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (OH~) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) MUD AT BOTTOM HOLE TEMPERATURE (BHT) MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): 2251 21 -APR-98 9033.0 9036.0 2948.0 9028.0 TOOL NUMBER HGR HCNT AIT-H 8. 500 3101.0 3102.0 LSND 10.30 46.0 9.1 5.2 212.0 1. 710 62.0 1. 910 62.0 REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG'. NABORS 18E. PULLED TIGHT REPEATEDLY BELOW AND UP TO 6000 '. THIS FILE CONTAINS THE REPEAT DATA AQUIRED AT O. 1667' SAMPLE RATE. $ LIS FORMAT DATA TOOL STANDOFF (IN): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-~Y-1998 08:~' PACE: 27 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOC TYPE CLASS MOD NUMB SAMP ELM CODE (HEX) DEPT FT 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 TT3 PEX US 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 TT4 PEX US 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 TT1 PEX US 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 TT2 PEX US 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 HDRA PEX G/C3 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 PEFZ PEX 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 PEF8 PEX 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 RHOZ PEX G/C3 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 RH08 PEX G/C3 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 HMIN PEX OH~4M 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 H~NO PEX OHMMl197045 O0 000 O0 0 9 1 1 4 68 0000000000 RXOZ PEX OH~ff41197045 O0 000 O0 0 9 1 1 4 68 0000000000 RX08 PEX OH~k4 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 HCNT PEX CPS 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 HCFT PEX CPS 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 HGR PEX GAPI 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 RHFT PEX CPS 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 RHNT PEX CPS 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 DPHZ PEX PU 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 HTNP PEX PU 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 HNPO PEX PU 1197045 O0 000 O0 0 9 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:03 PACE: 28 ** DATA ** DEPT. 9146.000 TT3.PEX TT2.PEX 418.800 HDRA.PEX RHOZ.PEX -999.250 RHO8.PEX RXOZ.PEX 1.772 RXO8.PEX HGR.PEX 110.140 RHFT. PEX HTNP. PEX 46.732 HNPO.PEX DEPT. TT2.PEX RHOZ.PEX RXOZ.PEX HGR.PEX HTNP. PEX 8682 334 306 000 2 295 8 973 79 944 33 167 TT3 . PEX HDRA. PEX RH08. PEX RX08. PEX RHFT. PEX H_NPO. PEX 736.400 TT4.PEX -999.250 PEFZ.PEX -999.250 P~4IN. PEX 1.813 HCNT. PEX 533.024 RHNT. PEX 45.945 769.600 TT4.PEX 0.100 PEFZ.PEX 2.195 H~IN. PEX 14.388 HCNT.PEX 707.456 RHNT. PEX 29.927 545.200 TT1.PEX -999.250 PEF8.PEX 1.678 HFiNO.PEX 2150.532 HCFT. PEX 2079.203 DPHZ.PEX 540.000 TT1.PEX 7.794 PEF8.PEX 2.621 H~NO.PEX 2650.218 HCFT. PEX 2411.875 DPHZ.PEX 610. 800 -999. 250 1. 581 574. 252 60721. 211 463.200 7.886 4.016 906.032 21.486 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION · O01CO1 DATE · 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION · O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 10 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 2 DEPTH INCREMENT: 0.0833 FILE SUA94ARY VENDOR TOOL CODE START DEPTH STOP DEPTH LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:03 PAGE: 29 AIT PEX $ LOG HEADER DATA 9146.0 9146.0 DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : 8682.0 8682.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GARR4A RAY CNT COMPENSATED NEUTRON AIT ARRAY INDUCTION $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) MUD AT BOTTOM HOLE TEMPERATURE (BHT) MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: 21 -APR-98 8Cl -205 1300 21 -APR-98 2251 21 -APR-98 9033.0 9036.0 2948.0 9028.0 TOOL ~ER HGR HCNT AIT-H 8.500 3101.0 3102.0 LSND 10.30 46.0 9.1 5.2 212.0 THANK YOU FOR USING SCHLUMBERGER. RIG: NABORS 18E. PULLED TIGHT REPEATEDLY BELOW AND UP TO 6000'. 1. 710 62.0 1. 910 62.0 THERMAL SANDSTONE 2.65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08:03 PAGE: 3O THIS FILE CONTAINS THE REPEAT DATA AQUIRED AT 0.0833' SAMPLE RATE. $ LIS FORMAT DATA * * DATA FORMAT SPECIFICATION RECORD * * * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 $ 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NOWB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1197045 O0 000 O0 0 10 1 1 4 68 0000000000 HCAL PEX IN 1197045 O0 000 O0 0 10 1 1 4 68 0000000000 ** DATA ** DEPT. 9146.000 HCAL.PEX 6.744 DEPT. 8682.084 HCAL.PEX 7.860 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 31 **** FILE TRAILER **** FILE NAME : EDIT .010 SERVICE · FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 11 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SU~VARY VENDOR TOOL CODE START DEPTH PEX 3101.0 $ LOG HEADER DATA STOP DEPTH 2943.0 DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) '. LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAlV~A RAY CNT COMPENSATED NEUTRON AIT ARRAY INDUCTION $ BOREHOLE AND CASING DATA 21 -APR-98 8Cl -205 1300 21 -APR-98 2251 21 -APR-98 9033.0 9036.0 2948.0 9028.0 TOOL NUMBER HGR HCNT AIT-H LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08~'~2~ PAGE: 32 OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 8.500 3101.0 3102.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10.30 MUD VISCOSITY (S) : 46.0 MUD PH: 9.1 FLUID LOSS (C3): 5.2 MAXIMUM RECORDED TEMPERATURE (DEGF) : 165.0 RESISTIVITY (Otff4M) AT TEMPERATURE (DEGF)'. MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): 1. 710 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 1.910 MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : THERMAL MATRIX: SANDSTONUE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: NABORS 18E. PULLED TIGHT REPEATEDLY BELOW AND UP TO 6000'. THIS FILE CONTAINS THE RAW CASED HOLE DATA AQUIRED IN CASING AT 0.5' SAMPLE RATE. $ LIS FORMAT DATA 62.0 62.0 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: 33 TYPE REPR CODE VALUE 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 TENS PEX LB 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 HTEN PEX LB 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 MTEM PEX DEGF 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 GR PEX GAPI 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 NPOR PEX PU 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 NPHI PEX PU 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 TNPH PEX PU 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 NRAT PEX 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 RTNR PEX 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 CNTC PEX CPS 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 CFTC PEX CPS 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 RCNT PEX CPS 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 RCFT PEX CPS 1197045 O0 000 O0 0 11 1 1 4 68 0000000000 ** DATA ** DEPT. 3101.000 TENS. PEX 2519.000 HTEN. PEX 765.186 MTEM. PEX GR.PEX 60.301 NPOR.PEX 51.102 NPHI.PEX 54.800 TNPH. PEX NRAT. PEX 4.153 RTNR.PEX 4.880 CNTC. PEX 1527.533 CFTC. PEX RCNT. PEX 1429.659 RCFT. PEX 377.432 DEPT. 2943.000 TENS. PEX 2451.000 HTEN. PEX 782.917 MTEM. PEX GR.PEX 48.447 NPOR.PEX 47.775 NPHI.PEX 50.728 TNPH. PEX NRAT. PEX 3.931 RTNR.PEX 5.073 CNTC. PEX 1349.794 CFTC. PEX RCNT. PEX 1326.880 RCFT. PEX 277.462 83.955 50.166 385.339 82.673 47.863 344.535 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 27-MAY-1998 08~-u~~ PAGE: 34 **** FILE TRAILER **** FILE NAME : EDIT .011 SERVICE · FLIC VERSION · O01CO1 DATE : 98/05/26 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/05/26 ORIGIN : FLIC TAPE NAME · 98247 CONTINUATION # : 1 PREVIOUS TAPE : CO~4~ENT : BP EXPLORATION, Z-38 PB1, PRUDHOE BAY, API #50-029-22873-70 **** REEL TRAILER **** SERVICE NAME : EDIT DATE '. 98/05/26 ORIGIN : FLIC REEL NAME : 98247 CONTINUATION # : PREVIOUS REEL : CO~k4ENT ; BP EXPLORATION, Z-38 PB1, PRUDHOE BAY, API #50-029-22873-70