Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout216-1137. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU V-08 Pull IBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 216-113 50-029-23568-00-00 13457 Conductor Surface Intermediate Production Liner 8962 135 2850 10096 3785 13357 20" 9-5/8" 7" 4-1/2" 8966 48 - 183 47 - 2897 45 - 10141 9964 - 13449 48 - 183 47 - 2727 45 - 8720 8308 - 8962 Unknown 1500 3090 5410 8540 None 3060 5750 7240 9020 10379 - 13357 4-1/2" 12.6# 13cr85 43 - 9971 8908 - 8966 Structural 4-1/2" HES TNT Perm Packer 9849, 8468 Stan Golis Sr. Area Operations Manager John Condio - (C) John.Condio@hilcorp.com 907 564 4696 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final 13.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028240, 0028241 No SSSV Installed 43 - 8573 N/A N/A 45 100 298 0 2745 640 1385 1619 320 299 N/A STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2021 Submit Within 30 days or Operations Sr Res Eng: 9849 8468 By Samantha Carlisle at 1:48 pm, Nov 03, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.11.03 13:33:43 -08'00' Stan Golis (880) RBDMS HEW 11/5/2021 SFD 11/4/2021MGR03NOV2021 DSR-11/3/21 ACTIVITY DATE SUMMARY 10/25/2021 CTU 9 1.75" CT Job Scope: Pull IBP MIRU. Make up and RIH with BOT's IBP retrieval BHA. Latch IBP at 12260ft. POH. LD fish - missing 3 stiffner rings. ***Job in Progress*** 10/26/2021 CTU 9 1.75" CT Job Scope: Pull IBP RDMO. Move to V-07 ***Job Completed*** 10/26/2021 T/I/O = SSV/1290/340. Temp = SI. IA FL (Ops request). ALP = 1600 psi, SI @ CV. IA FL @ 3680' (3682' above sta # 4 SO). SV, WV, SSV = C. MV = O. IA, OA = OTG. 23:30 10/29/2021 ***WELL S/I ON ARRIVAL***(profile modification) RAN 4-1/2" BRUSH, 3 PRONG WIRE GRAB TO 10,587' SLM. (no recovery) SET 4-1/2" DREAM CATCHER IN X-NIP @ 9,883' MD. (85" OAL) ***JOB COMPLETE, WELL LEFT S/I*** Daily Report of Well Operations PBU V-08 Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:216-113 6.50-029-23568-00-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 13457 12293 8958 9849 None 12293 8468 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 135 20" 48 - 183 48 - 183 3060 1500 Surface 2850 9-5/8" 47 - 2897 47 - 2727 5750 3090 Intermediate 10096 7" 45 - 10141 45 - 8720 7240 5410 Production Perforation Depth: Measured depth: 10379 - 13357 feet True vertical depth:8908 - 8966 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13cr85 43 - 9971 43 - 8753 9849 8468Packers and SSSV (type, measured and true vertical depth) 4-1/2" HES TNT Perm Packer Liner 3785 4-1/2" 9964 - 13449 8308 - 8962 9020 8540 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 33112862241203 3007378 1242 383 124 163 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: John Condio John.Condio@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907 564 4696 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon …Plug Perforations 5 Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8962 Sundry Number or N/A if C.O. Exempt: 321-108 No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Operations shutdown … Change Approved Program … N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend …Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 028240 & 028241 PBU V-08 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 2:38 pm, Apr 12, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.04.12 14:30:22 -08'00' Stan Golis (880) DSR-4/12/21 RBDMS HEW 4/12/2021 SFD 4/15/2021MGR24JUN21 ACTIVITY DATE SUMMARY 3/27/2021 T/I/O=xx/1375/290 Temp=90* Bullhead 1% SKL down tbg (Pre CTU) AL Shut in and flagged. Pumped 8 bbls 60/40 down FL to freeze protect. Pumped 290 bbls of 120* 1% SKL and 2 bbls 60/40 to freeze protect surface lines. Monitored pressures for 30 min. TBG pressure after 30 min= vac. Freeze protected TBG with 38 bbls of 60* diesel. Tags hung. SV WV SSV = close MV IA OA= open. Final Whp's=vac/1250/237 3/29/2021 CTU#9 2.0" CT. Job Scope: Mill XN-Nip / NCS Isolation Pkr / Cont Plug / Adperf. MIRU CTU. RIH w/ Baker 3.79" Parabolic Mill & 3.80" String Reamer. Displace well to 1% KCL w/ Safelube. Tag XN-Nipple. Get weight back & Flag Pipe. Corrected EOP @ Flag = 9931.25'. Mill thru XN-Nipple. Reciprocate across several times. Pick up to 9900' and perform a dry drift. Tag high at 10588', then 10767', then 10796'. Repeated Tags at 10796'. Fluff/Stuff down to 10832'. Puh above Perfs and re-attempt Dry Drift from 10320'. Tag at 10756'. ***In Progress*** 3/30/2021 CTU#9 2.0" CT. Job Scope: Mill XN-Nip / NCS Isolation Pkr / Cont Plug / Adperf Re-tag at 10756'. Appears we have Fill in the Liner. Discuss job OE. Decide not to cleanout with the fullbore BHA on and stabilizer. Pooh to pick up cleanout nozzle. Freeze Protect Coil with Diesel. MU & RIH w/ 2.0" JSN. Dry Tag PBTD at13316'. Clean out pumping gel sweeps. Chase ooh. Freeze Protect Coil and Tbg with Diesel. Perform Weekly BOP Test. ***In Progress*** 3/31/2021 CTU#9 2.0" CT. Job Scope: Mill XN-Nip / NCS Isolation Pkr / Cont Plug / Adperf Finish Weekly BOP Test. RIH w/ Read 2.375" Logging Carrier & Baker 3.79" Nozzle Drift. Tag in Liner at multiple depths. Tag at 11460' and unable to get deeper. Attempt to get past by pumping down backside and down Coil with no success. Log from compression off the obstruction up to 9950'. Flagged pipe at 11352'. Pooh. Receive good data ( + 35' Correction). Corrected Obstruction Tag Depth = 11492.66'. Discuss job with OE. RIH 3.80" Parabolic Milling BHA. Tag obstruction at 11461' CTMD and attempt to mill through. Appears to be steel/liner damage. ...Continued on WSR 4-1-21...*** 4/1/2021 CTU #9 - 2.0" Coil ***Cont. from WSR 3-31-21*** Job Objective: Well Test with NCS packer, cont. CIBP and AddPerf POOH with 3.80" milling BHA. Discuss with OE. RIH w/ Read 1.69" x 24-Arm Caliper w/ GR/CCL. Log from 13275' ( ~ 50' off TD) up to 9100'. Flag Pipe at 12250' and 11300'. Pooh. Receive good data ( + 26' Correction). Correlate to PDCL 19- April-2018. Min IDs inconclusive due to accurate reading from only 10 of 24 arms, however liner damage detected from 11488'-11520', 11646'-11656', 12682'-12701', and 13130'-13140'. Make up 2.80" DJN for IBP drift and RIH. Drift clean down to 12800' through most of liner damage, POOH. ...Continued on WSR 4-2-21...*** Daily Report of Well Operations PBU V-08 Daily Report of Well Operations PBU V-08 4/2/2021 CTU #9 - 2.0" Coil ***Cont. from WSR 4-1-21*** Job Objective: Set IBP POOH with 2.80" DJN drift BHA. RIH w/ Baker 2.50" IBP. Pass thru liner restriction at ~ 11460' with no issues. Correct Depth at Flag. Set IBP Middle Element @ 12300'. Top of IBP @ 12293'. Pooh. ***IBP rated for 6300 psi differential with 1-3/8" Extenal FN. 11.08' OAL. Note damaged liner sections when retrieving. Run smaller bell guide & hyd centralizer when retrieving*** ***Job Complete for Now / Turn over to Pad-Op to POP*** Operator Name:2. Exploratory Development Service… …5 … Permit to Drill Number:216-113 6.API Number:50-029-23568-00-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 028240 & 028241 Property Designation (Lease Number):10. 341H 8. PBU V-08 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon …Plug Perforations 5 Fracture Stimulate …Repair Well … Operations shutdown … Op Shutdown GAS … GSTOR…WAG … SPLUG … … Abandoned Oil 5 WINJ … Exploratory …Development 5Stratigraphic……Service WDSPL … 12. Attachments: PRESENT WELL CONDITION SUMMARY 13457 Effective Depth MD: 13cr85 11. 4/1/2021 Commission Representative: 15. Suspended … Contact Name: John Condio Contact Email:john.condio@hilcorp.com Authorized Name: Stan Golis Authorized Title:Operations Manager Authorized Signature: Plug Integrity …BOP Test …Mechanical Integrity Test …Location Clearance … Other: Yes …No …Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: …OtherAlter Casing Pull Tubing … Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: No SSSV Installed Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 8962 Effective Depth TVD:Plugs (MD):Junk (MD): …Other Stimulate Re-enter Susp Well Suspend … …Plug for Redrill 5Perforate …Perforate New Pool 9849, 8468 No SSSV Installed Date: Liner 3785 4-1/2"9964 - 13449 8308 - 8962 9020 8540 Well Status after proposed work: 16. Verbal Approval: 5 … …Change Approved Program 47 - 2897 47 - 2727 14. Estimated Date for Commencing Operations: BOP Sketch 48 - 183 Structural 7240 Proposal Summary 13. Well Class after proposed work: 4-1/2" HES TNT Perm Packer 10379 - 13357 8908 - 8966 4-1/2" 12.6#43 - 9971 Production 13357 8966 None None 48 - 183 1500 9-5/8" 7" Contact Phone:602) 373-0659 Date: 5410 135 306020"Conductor 3090 …GINJ 5 Post Initial Injection MIT Req'd? Yes No … 5 …… … Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Surface 2850 5750 Intermediate 10096 45 - 10141 45 - 8720 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. …No 5Yes Casing Length MD TVD Burst Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic … 2470 Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. By Samantha Carlisle at 2:00 pm, Mar 04, 2021 321-108 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.03.04 13:47:12 -09'00' Stan Golis (880) MGR05MAR21 DLB03/04/2021 10-404X DSR-3/4/21 Yesion Required? Comm. 3/8/21 dts 3/8/2021 JLC 3/8/2021 RBDMS HEW 3/8/2021 Add Perf Procedure V-08 PTD:216-113 Well Name:V-08 Add Perf API Number:50-029-23568-00 Current Status:Producing (PAL)Rig:CTU Estimated Start Date:04/1/2021 Estimated Duration:6days Regulatory Contact:Abbie Barker Permit to Drill Number:216-113 First Call Engineer:John Condio (602) 373-0659 (c) Second Call Engineer:Brodie Wages (713) 380-9836 (c) AFE Number:212-00268 IOR 100 bopd Current Bottom Hole Pressure:3800 psi @ 8,800’ TVD (8.4 PPGE pattern estimate) Max. Anticipated Surface Pressure:2470psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:2050 psi (8/10/2019 DHD – cold TIFL) Min ID:3.725” ID, XN Nip @ 9953’ MD Max Angle:103 Deg @ 11,116’ Reference Log: Brief Well Summary: V-08 is a horizontal Ivishak producer drilled in 2017. It is currently producing ~ 2300 bfpd @ 90% WC. Historical productivity for this well shows approximately 1 bfpd/ft perfs, and as such, the liquid rate is expected to increase 500 bfpd @ 80-85% WC, or 75-100 bopd increase in production. Initial productivity may be higher. Objective: The objective of this job is to locate and shut off high WC intervals by running a NCS isolation test packer on CT and test two intervals for a short duration (~6 hours each). If the toe is determined to be the source of high WC, a CIBP will be set, then add 500’ of bypassed pay. If the toe is not the source of high WC, the plan would be to RDMO to determine a path forward to isolate the middle and/or heel section. Sundry Procedure (Approval Required to Proceed): Note: The well will be killed and monitored before making up the initial perf guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Pre-Coil/FB Well Kill Test 1. RU pump truck, load and kill well with 1.5x tubing volume of SW, record rates and pressures, monitor 2. Hand over to ops to BOL, RDMO Coil Tubing 3. MIRU Coiled Tubing Unit and support equipment. 4. Run GR/CCL logging tools, make tie-in pass, paint coil flag 5. Run NCS treating packer with well flowing, tie-in to coil flag 6. Pull up, set packer to test two perforated intervals: Table 1: Perf Intervals to be tested by difference Packer Depth Perforations Tested BU Volume Test Duration ~12,500’10,379’ to 12,120’150 ~6 hours, or OE discretion ~11,700’10379’ to 10,443’150 ~6 hours, or OE discretion * Add Perf Procedure V-08 PTD:216-113 7. POOH and laydown test packer 8. Consult OE if CIBP will be set. If a future cement squeeze is required to isolate high WC zones RDMO. A new program and sundry will be required to isolate high WC perforations. 9. Bullhead 305 bbls of KWF (8.4 ppg 1% KCl w/ SAFE LUBE down the tubing to the formation, freeze protect well. 10. Run standard CIBP for 4-1/2”, 12.6#, 13CR-85 liner, tie-in using painted coil flag. 11. Set CIBP at 12,500’ MD. POOH 12. Confirm well is dead. Bleed any pressure off to return tank. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 13.Pickup safety joint and TIW valve and space out before MU guns. “Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary” 14. Break lubricator connection at QTS, makeup TCP guns and blanks per schedule below. *Use 2.875” Maxforce, 6 spf, 60° phasing (or equivalent) V-08 Add Perf Schedule Perf Interval Perf Length Gun Length Weight of Gun (lbs) at 5.6 ppf Run 1 12120-12370 217 250 1400 Run 2 11045-11545 258 500 2800 15. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above, note any change in tubing pressure in WSR. 16. POOH. Stop at surface for flow check, reconfirm well dead and hole full. 17. Review well control steps with crew prior to breakinglubricator connection and commencing breakdown of TCP gun string. Ensure well is freeze protected while POOH on final run. 18. RDMO CTU. 19. Hand well over to operations for POP. Attachments: 1. Current Wellbore Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Mini Log 7. V-08 PDC Tie-In Log Header Standing orders flow chart included with this sundry request. *See note above regarding kill methods if pressure observed at surface after perforating. Add Perf Procedure V-08 PTD:216-113 Current Wellbore Schematic Add Perf Procedure V-08 PTD:216-113 Proposed Schematic Add Perf Procedure V-08 PTD:216-113 Coiled Tubing BOPs Add Perf Procedure V-08 PTD:216-113 Equipment Layout Diagram Add Perf Procedure V-08 PTD:216-113 Standing Orders for Open Hole Well Control during Perf Gun Deployment Add Perf Procedure V-08 PTD:216-113 V-08 Mini Log Add Perf Procedure V-08 PTD:216-113 V-08 PDC Tie-In Log Header Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: March 4, 2021Subject: Changes to Approved Sundry Procedure for Well V-08Sundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (RWO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate M Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Dflll Number: 216-113 3. Address P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-23568-00-00 7 Property Designation (Lease Number): ADL 028240 & 028241 6. Well Name and Number: PBU V-08 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL RECE 11, Present Well Condition Summary: Total Depth: measured 13457 feet Plugs 9 measured None feet true vertical 8962 feet Junk measured None feet OC°rr ry 23 201 Effective Depth: measured 13357 feet Packer measured 9849 feet true vertical 8966 feet Packer true vertical 8468 feet A®G C Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 135 20" 48-183 48-183 3060 1500 Surface 2850 9-5/8" 47-2697 47-2727 5750 3090 Intermediate 10096 T 45-10141 45-8720 7240 5410 Production Liner 3785 4-1/2" 9664-13449 8308-8962 9020 8540 Perforation Depth: Measured depth: 10379 - 13357 feet True vertical depth: 8908-8966 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr85 43-9971 43-8573 Packers and SSSV (type, measured and 4-1/2" HES TNT Perm Packer 9849 8468 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13_ Representative Daily Average Production or Injection Data Oil -Bbl Gas -Md Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 278 343 1180 1498 314 Subsequent to operation: 289 432 1414 1193 317 14. Attachments: (required per20 MC 25.07025.071, &25.2V) 15. Well Class after work: Daily Report of Well Operations IZ Exploratory ❑ Development p Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work, Oil m Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA if C.O. Exempt: NIA Authorized Name: Peru, Cale Contact Name: Peru, Cale Authorized Title: Petroleum En a er Contact Email: Cale.Peru@bp.com Authorized Signature: Date: Contact Phone: +1 9075644522 Form 10404 Revised 04/2017 It ti// /7J RBDMS-W^�OCT 2 5 2019 Submit Original Ony E Daily Report of Well Operations PBU V-08 ACTT V ITYnATF &I ueRA w My ***WELL FLOWING ON ARRIVAL*** (Perforating/GL Redesign) HES RELAY UNIT #46 INITIAL T/I/O = 1000/1675/150. MIRU & PT. DRIFT W/ 30'x 2-7/8" DUMMY GUNS, DEVIATE OUT @ 10457' SLM SET 4-1/2" WHIDDON C -SUB @ 9,924' SLIM / 9,953' MD PULLED DMY-GLV STA# 2 @ 8,728' SLM / 8756' MD 2/6/2019 ***JOB CONTINUED ON 07 -FEB -2019*** ***JOB CONTINUED FROM 06 -FEB -2019*** (Perforating/GL Redesign) HES RELAY UNIT #46 MADE 5 FAILED ATTEMPTS TO PULL ST. #3 @ 7,908' SLIM / 7,934' MD. R/U LRS & PUMP 150 BBL'S CRUDE DOWN TBG. RAN DOUBLE 4-1/2" BLB, 3" GAUGE RING & BRUSH GLM 2 @ 8756' MD & GLM #3 @ 7934' MD. 2/7/2019 ***JOB CONTINUED ON 08 -FEB -2019*** ***JOB CONTINUED FROM 07 -FEB -2019*** (Perforating/GL Redesign) HES RELAY UNIT #46 MADE 2 FAILED ATTEMPTS TO PULL ST #3 @ 7,934' MD w/ ML PULLING TOOL. SET BK-OGLV IN ST #2 @ 8,756' MD PULLED EMPTY 4-1/2" WCS FROM 9,953' MD. JOB POSTPONED DUE TO RIG JOB. ***WELL S/I ON DEPARTURE*** ***NEW BK-OGLV SET IN ST #2 @ 8,756' MD. BK-OGLV IN ST #3 @ 7,934' MD HAS STRIPPED 2/8/2019 FISHING NECK*** ***WELL FLOWING ON ARRIVAL***(perforating) SET 4 1/2" WCS IN XN NIPPLE AT 9953' MD. 4/17/2019 ***CONT ON 4-18-19 WSR*** ***CONT FROM 4-17-19 WSR***(GL for rate) PULLED S/O FROM STA #3 AT 7934' MD. SET DOME GLV IN STA #3 AT 7934' MD. PULLED 4-1/2" WHIDDON CATCHER SUB FROM 9920' SLM.(empty) DRIFTED TBG W/ 20'x 3.70" DUMMY WHIPSTOCK TO 3000' SLM.(no issues) ***WELL S/I ON DEPARTURE, PAD -OP NOTIFIED OF WELL STATUS*** ***DRIFTED TO 3000' SLM W/ 3.70" x 20' DUMMY WHIPSTOCK FOR SUBSIDENCE 4/18/2019 SURVEILLANCE*** ***WELL FLOWING ON ARRIVAL*** RIH W/ HES 2-7/8" X 32' MAXFORCE HMX PERF GUNS, 60* PHASING AND 6 SPF. 9/23/2019 ***JOB CONTINUES ON 24 -SEP -19 WSR*** ***CONT FROM 9-23-19 WSR***(ADPERF) CONTINUE TO RIH W/ HES 2-7/8" X 32' MAXFORCE HMX PERF GUNS, 60* PHASING AND 6 SPF. PERFORATE 10,411'-10,443' ELMD. PERFORATE 10,379'-10,411' ELMD. 9/24/2019 WELL S/I ON DEPARTURE. PAD -OP NOTIFIED OF WELL STATUS*** TREE= 4-1/16" CNV WELLHEAD= FMC SAFETY NOTES: WELL ANGLE >700@10568'. ACTUATOR= V=08 "` MAX DOGLEG:16.80 @ 10413'**- OKB. ELEV = 97.95' "" 4-1/2" CHROME TBG & LNR REF ELEV = 97.95'' BF _BEV = 53.37' ATT 2024' 4-1/2" HES X NIP. K) = 3.813" K 30" CONDUCTOR, 129#, 18.770" 40#, L-80 HYD 563, ® =I 1 —3030' 1 IT' B1 C WFT H MDL754 STAGE TOOL, ID = 6.19- 17", 26#, L-80 VAM TOP HC WFT ACP, O = 6.25" Minimum ID = 3.725" @ 9953' 4-1/2" HES XN NIPPLE 4-1/2" TBG, 12.6#, 13CR-85 VAM TOP, .0152 bpf, ID = 3.958" 7" GSG, 26#, L-80 VA M TOP HC, ID = 6.276" 10141' PERFORATION SUMMARY REF LOG: MWD -GR LOG ON 03/14/17 ANGLE AT TOP PERF: 46'@ 10379' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL O n/S z SHOT SOZ 2-7/8" 6 10379 -10411 O 0924/19 5113 2-7/8" 6 10411-10443 O 0924/19 7 2-7/8" 6 10384 - 10389 O 11/17/18 0523/17 2-314" 6 11778-12120 O 03/18/17 16 2-3/4" 6 12623 -12655 0 03/18/17 KBG2 DMY BK 2-3/4" 6 12700 -13286 0 03/18/17 37 2-3/4" 6 13316 -13357 O 03/18/17 6789 PBTD 13357' VAM HTTC, 13449' ID = 3.958" rns i KT nnenrnnn e ST MD ND DEV TWE VLV LATCH PORT DATE 9 3252 3017 36 KBG2 DOME BK 16 10/14/19 8 5113 4517 37 KBG2 DOME BK 16 10/14/19 7 5934 5176 37 KBG2 DMY BK 0 0523/17 6 6340 5501 37 KBG2 DOME BK 16 10/14/19 5 6747 5826 37 KBG2 DMY BK 0 10/14/19 4 7362 6320 37 KBG2 SO BK 22 10/14/19 3 7934 6789 30 KBG2 DMY BK 0 10/14/19 2 8756 7509 29 KBG2 DMY BK 0 10/14/19 1 r9621 8270 27 KBG-21 DMY BK 0 03/19/17 14-12" HES X NIP, ID = 3.813" 1 X 4-1/2" HES TNT F /2" HES X NIP. D = 9964' 7" X 5" H521 WFT WTSP4R3 LTP& H521 WFTWPHR(WPHS HGR w /WFT TIEBACK SLEEVE 1)=4.310" 9971' 4-1/2" WLEG, ID=3.958" 9985'5" X 4-1/2' XOR) = 3.890" DATE REV BY COMMENTS DATE REV BY COMMENTS 0320/17 P-272 NEW WELL 10/17/19 JMG/JMD GLVC/O 10/14/19 04/17/17 NS/JMD FINAL ODE APPROVAL 1126/18 KFWJMD ADPERFS 11/17/18 02/13/19 MS/JMD GLV C/O (02108/19) 0421/19 JPK/JMD+ GLV C/O 04/18/19 0925/19 EPD/JMD IADPERFS (09)24/19) PRUDHOE BAY UNIT WELL: V-08 PERMfT No:11161130 API No: 50-029-23568-00 SP EcpbreBon (Alaska) STATE OF ALASKA C' IV E D ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ �^a Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Change App s gr`Oi \„-, w� Plug for Retlrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Operator Name: BP Exploration (Alaska), Inc 14. Well Class Before Work Development ® Exploratory ❑ 15. Permit to Drill Number: 216-113 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-23568-00-00 7. Property Designation (Lease Number): ADL 028240 8 028241 8. Well Name and Number: PBU V-08 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 13457 feet Plugs measured None feet true vertical 8962 feet Junk measured None feet Effective Depth: measured 13357 feet Packer measured 9849 feet true vertical 8966 feet Packer true vertical 8468 feet Casing. Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 135 20" 48-183 48-183 3060 1500 Surface 2850 9-5/8" 47-2897 47-2727 5750 3090 Intermediate 10096 7" 45-10141 45-8720 7240 5410 Production Liner 3785 4-1/2" 9664-13449 8308 - 8962 9020 8540 Perforation Depth: Measured depth: 10384 -13357 feet True vertical depth: 8912-8966 feel Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr85 43-9971 43-8573 Packers and SSSV (type, measured and 4-1/2" HES TNT Penn Packer 9849 8468 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Md Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 202 498 638 1216 299 Subsequent to operation: No Test Available 1250 360 14.Attachments: (required per 20MC 25m025.071,&25.289) 15. Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development ® Service ❑ Stratigraphic ❑ 16. Well Status after work: Oil ® Gas ❑ WDSPL ❑ Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Authorized Name: Peru, Cale Contact Name: Peru, Cale Authorized Title: Petroleum En er Contact Email: Cale.Peru@bp.00m Authorized Signature: Date: Contact Phone: +1 9075644522 Form 10.404 Revised 04/2017 R,'Sft /!,% RBDMS`%VEC 17 2018 Submit Original Only ***WELL FLOWING ON ARRIVAL*** (pre eline perfs) DEVIATE OUT @ 10,454' SLM w/ 30'x 2-7/8" DUMMY GUNS, 2-1/2" SAMPLE BAILER. (no sample) DRIFT TO X-NIPPLE @ 2,024' MD w/ 3.70" x 20' DMY WHIPSTOCK. ***WELL S/I ON DEPARTURE, PAD OP NOTIFIED'* ***DRIFTED TO 2,024' MD w/ 3.70" x 20' DMY WHIPSTOCK FOR SUBSIDENCE 7/1/2018 SURVEILLANCE*** ***WELL FLOWING ON ARRIVAL*** (SLB ELINE: PERFORATE) INITIA T/I/O = 550/1200/150. S/I WELL & R/U. R/U LRS & FP FLOWLINE AND TBG. RUN 1: PERFORATE 10384'- 10389'W/ 2.875" POWERJET, 6 SPF, 60 DEG PHASED GUN. PERFO M JEWELRY ALL LOGS CORRELATED TO BPXA PDCL LOG DATED 19-APR-2018 WELL S/I ON DEPARTURE. FINAL TWO = 800/1275/150. 11/17/2018 1�?ROMO. ***JOB COMPLETE ON 17-NOV-2018*** TR✓£= 4-1116' CNV WELLHEAP- FMC ACTUATOR =___ Tiff LOG: AMVD-GR LOG ON 03/14/17 OKB. Tif V = 97.95 R!FELEV = 97.95 BF. ELEV_= 53.3T KOP= 300 Max Angle = 103" @ 11116' Datum AD= Datum TVD= 10364' 8600'SS 20' X 30' CODA D = 18.770' 35/8" CSG, 408, L-80 I ESTMATEi) TOP OF 7' BTC (03/17/17) 1-1 -3030- ) VAM TOP HC WFT ACP, 0=6.25- 1--4$5! HATED TOP OF CEIVEW(03/17/17) -666 Minimum ID = 3.725" @ 9953' 4-1/2" HES XN NIPPLE ITOP OF 41/2' LNR I .0152 bpf, D = 3.958' TOP HC, D = 6276' 1-1 10141' 4-112" LNR 12.6#, 13CR-85 VAM HTTC, 13449' .0152 bpf, D = 3.956" SAFETY NOTES: W ELL ANGLE> 70° @ 10568'. V_08 •'•MAX DOGLM--16.8'@10413'••' •••' 4-12' CHROM E TBG & LNR TER-Ft 2027& 4-1/2" HES X NP D = 3 813" W:F187ti5412 r:: e169 ST PERFORATION SUAr WRY TVD Tiff LOG: AMVD-GR LOG ON 03/14/17 TYPE ANGLEAT TOP PEW: 46" Q 10384' Note: Teter to Production OB for historical perf data SIZE SPF INTERVAL Opn/Sgz SHOT SOZ 2-7/8" 6 10384 - 10389 O 11/17/18 5113 2-3/4" 6 11778-12120 O 03/18/17 16 2-3/4' 6 12623- 12655 O 03/18117 KBG-2 2-3/4" 6 12700- 13286 O 03/18/17 6340 2-3/4" 6 13316 - 13357 O 03/18/17 0 4-112" LNR 12.6#, 13CR-85 VAM HTTC, 13449' .0152 bpf, D = 3.956" SAFETY NOTES: W ELL ANGLE> 70° @ 10568'. V_08 •'•MAX DOGLM--16.8'@10413'••' •••' 4-12' CHROM E TBG & LNR TER-Ft 2027& 4-1/2" HES X NP D = 3 813" W:F187ti5412 r:: e169 ST MD TVD DEV TYPE VLV LATCH PORT DATE 9 3252 3017 36 KBG-2 DOME BK 16 05/23/17 8 5113 4517 37 KBG-2 DOME BK 16 0523/17 7 5934 5176 37 KBG-2 DMY BK 0 05/23/17 6 6340 5501 37 KBG-2 DMt' BK 0 03119/17 5 6747 5826 37 KBG-2 DOBE BK 16 0523/17 4 7362 6320 37 KBG-2 OM2" BK 0 03119/17 3 7934 6789 30 KBG-2 SO BK 22 0523117 2 8756 7509 29 KBG-2 DMY BK 0 03119/17 1 9621 r8270 27 KBG-2 DW BK 0 03119/17 9820' 9963' 9964' 1 9986' 1 DATE REV BY COA&8dT'S DATE REV BY COKOA34TS 0=0117 P-272 NEIN WELL 05/10/17 JNJ.MtD ADD® Tiff ELEV 0327/17 JAD DR -G HD CORRECTIONS 0524/17 C"AU GLV C/O (0523/17) 0328/17 LG/JkD GLV C/O (0324/17) 1126/18 KFMUMD ADFEtFS (11/17/18) 04117117 JNJJbU EDITS TO COND & LNR INFO 04117/17 NS/JMD FINAL ODEAFPROVAL 04/17/17 NSIJMD CORY= LNR CMT DEPTH hESX NP. D=3.813' X 4-1/2" HB TNT PKR D = 3.865- 112- .865"1/2- HES X NP, D = 3.813' 1/2' HES XN NP, D = 3.725' X 5' H521 WFT 1NTSP1R3 LTP & F1521 FTVVPHRIVO+S HGR w lWFT TRACK .EEVF ID=4.310' 1/2'%M- D=3.958' X 4-12' XO, D = 3.890" PRIDHOE BAY LUT WELL V-08 PEMT No: '2161130 AH No: 50-029-23568-00 SEC 11, T71 N1 R11 E, 4689 FSL & 1634' FEL BP Exploration (Alaska) • • • o r o o o ( M M M . O O N co co j >I (NI>.I >I 0_ M CO‘- cv CO 0 c Z Z Z ci I- 1- n N •fp 3 7 7 •- 0 0Q 0Q T U 1 NI 2 > > J CO E J la la N al o 5 >- m .I �I �I C •C c p o Et W a_W m b o m m CO CO LLL CLL LLo 0 > d a o. 0 IC) 0 a a a . _,e . CO m=1p M= C aID g > f6@i @ i a� ai 6a ui a) aai Z a>0 Co ui U N Z 3 mti� mtiN mLL< �I �I �I co a mHID (a I� a a) NMg _0 oQ 0Cc)- O O O pQ •> Q 0JN 0J Q J _ _ C N it NI-• LL CV LL NI C•_ >� �I �Iv CL « m LLQ 3 LLCO LL' o aa)0 ' 0N- " aTiY D D o 0 co W - I I - I I J w CD >co a) > co a) Zc0 m co 03 SR CD o 0 0I- 0I_ � O y 3v 7v 7J CL CL CL� > > _ U)(n 2 'n CO c C• p o '" (0(0Q « Q «( o .. id .. 3 id id 0 « I 0 o c m c m c c ns c w o m Ip m IU Z r d 0•0 0 0•0 0 0 •g c iL a iL'� It—Iit I.L W 0 n 0 0� I Y N d E UCL �p UCL (p UCL Co 3.)N .0n V NI U U CL,,,,U) UO C UO W 3 E •C Y C- *EY C C C C .0 OCL 'CN p •GN v� a7 0co � 0 . a) I Uo caWI o Si(1)1 ON oN oN o o ME 2QUI OQI 6I. J aUico0 NOIo -0010 N N N N N N N N Ow NN-N 75 � N WON W0N WON W LL W LL LI LL W W N= W CO W M O p O p c a�r� r N- N- N- N- I. a 0 Y >Io 0 E. 0 0 0 0 0 0 N- ‘ -- CL « N N N N N N N N N N oc dc-- 1 @ •� CO CO CO O (O CO CO CO CO W r r r r r ,,- c-ii N N J M M M M M M M C7 a 'W W — Or J V I = _ m Q1 1 1 O V Z CV co r O co N M M CL o O O ti . c .c• r O z� ,,co 1 «,tn o O CO 01 0 • N n p F E n U Z-1 p U o c o J p o -- Q > � z t op O to > a > 1 w Ca H N Z c o y °� J 2 = o E 5 G N N COCD 1 dl Q N 0 J N CO M Ili W ♦'M^ 0 a) 1 Z 1 V/ I 0 I LULU � II—Qft Cll ' O. -0-- � - a Z 0 Z U E ° o C z 7 CO g 1 co « « « « « « « to « « m ar o as Co as m as as as v m m � E E a 0 0 0 0 0 0 0 0 0 0 0 Z z m w° :a q w m m m 2 m m m •m •2' .a .2' .2 .0) .5) m .E .a O) _ 0 0 0 0 0 0 0 0 J 0 0 o 0 z p 1 , co > O J ` d a1 7 V V V V V vt N- N ! V. I- - N d I N- n r N- N- N- N- N- h V .4- :13 a) p � E 'O o O O O O O O O j CO < z -c C d co 7 Co co co co Co a0 co co CO CO CO ✓ O o W G z N N N N N N N N N N N N O Q p ca LL E € , ,0 L. z v C wa p v 0 0 a c v Z y� C 0 M 0 0 0 0 0 0 0 0 0 0 0 0 E 0 O I I- o. J 2G. 0 0 0 p 0 0 0 0 0 0 0 OQ a 0 I-- -1 0' 31'-' w w w w w LU W w J w w • • r n CD • o rn cr N N _ N C COin UD LU-173 LU O c J CI 01 N °D I I Ia I 'kill a c > ca 0 1 1 = 2 m1.0 2N =N- =o d -0 0 0 , O N Z 0 - 0 0-o UN 0-p ON o 0 ti N 0 Ulw UIW U)1 U)� U)1 a U)10 U)I a U)10 N LL O O UI Z_1 co a d N h I- h h I h h I ii = co co Q b N 5 ...JCL >< W m J J J N Ja- J•O J� �' 0 a d a 0 N y U) U) In No (!) 21 co > > n- I 'n m =IN m=ID 01 01.0 01J1 01 I 01 JI 01 1 0 I h F m = g 6C.) m oUN 1= h a H'5 -0 t_ �. - 0 I J Z Z o0 Z E U) a E U)O U)N U)n (/)ce U)c U)ce U)c J E U) c h1� c hlJl o I O I o } } c h o to I m IU I IU I ,--)N 1rJo n 0- nJ n n 1 n o n 1 Q>� >QQF- co Q a�J W c)O L L 0 LL 1 N h- N 01 N g N@ N O N ' X h 1 X I W co CO L L 01 15 F- N hlo d'0 E'd' Q 0 d' � W 0 d'� U) -i U)650 N�c <4 —11Q 1 Q01 <4 c) Qo1 <01 0301 mNl 2 DC O O U) jj O m0W X00 0 M � 2 20 Mao Min MLo n O 0 0 B00 N �") m 101 m IU 2n0 2nU 2nN �nN ono �n0 �_� �Nt D D m I. Z • 0 h-U 0 N1 LL'1 WI LE "-I o LL'1 p W 'I p LL.1 o LL '-1 o it(S4° W U d a co Q U) D n a N Uo c O0 U� 0 o.-0 v_�0 Uro U<-C _U.-O U O U . CC pL - •. t�o� `sS 0'' O V O N O ZOO *EC) UI TI O U)M O UI M O UI O UI O , O cP _M w mW 2W= y ct IEEE .e cn "m sI v m SI a)X U v X X h1 8 X h1 a X h1 v X h1 8�I a v�I-61 c_O a co a v m 01 Lj�t a ono _nO od 1 2d 1 oa< _a< _a < _a< oco.. eco- w w _1... ,- ,- n , N w.-U) cu,- co w m Z w m Z w m w w m w w m W W m w w o L W o D NM N= Ula- 0 O ZOn n n n n n is. n n n n a F= U o 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N _ W co O W OD W a0 W CO M CO aD ON N N N N N N N N N N oe - v v v - v v v v v v a w W Sor J C.) m P • Z w _ CD o ci o � o in t o. as - 0 N CL r ° co C co o o C N 0 O f IL E (..) 5=-1 U 0 0 —I N < m coo. — > •I— ~ n � o CO2 • N m N m CO O N 0 m 0 Q W 1- • . Q ° Z U N N E c c m U) N co Z l mm m m m m m m m m y h-) m N m m m m m m CO CO CO CO N m p Iii N 0 0 0 0 0 0 0 0 0 0 0 0ca ma m To m m To CO CO To To CO I I m 0 (] 0 J J 0 M > n n n n n n n n n n n CO 0 • F_ V V V V V Tr Tr V mr V mr mr U) cO CO CO cO co CO cO CO CO cO CO co U) N N N N N N N N N N N N N N D• 10 •1 M • U SU 0 0 0 0 0 0 0 0 0 0 0 0 0 C7 E O 0 m CD0 Q O 0 0 0 0 0 0 0 0 0 0 0 0 d 2 W W W W W W W LU W W J J W • • 9 O E E �' - .• N CO COco vO 6, 0 O) a 0 o) �O o 42 O ` T M J E E E E O JO J O -a XV0 ) a) aJ Oal V1O �Jc21 2 2c > Ro) U I c1c I I _ I U _ aai a) a) ❑ Q 0 — 0 _ W ❑ ❑ o bo o ❑ 0 ❑ O O > > >d 03 1 > N 2 NI t Q u) uu) u > =N m2F N I 2` I a. E 2 I 2' F F C m U z a)• O F O F F O F O C_ C_ C_ C_ C_ Z 1 E E J J J _11 -11 LL LL LL LL LL ❑ , RIF 1 a I I I I I } Q a) J Q N 2 2 1 2 2 I S 1 2 I 2 2 2 m m u) m u) CO !0 CO u) CO u) CO CO CO CO CO Oa0 ''LL O N LL I V) I u) I— I u) 1 to I I IIG)FId 0 a�2l o j o co co o 0 0 0 0 o p 0 O5J 2 co u.1 > > F > > I— > (6 > > F > > F > > > > > i • ❑ co2 E N E to ❑ N ❑ U 03 1 a) o) a) I a) CM a) I a) a)o a) I a)o a) I a) a) a) a) a) D Z ❑ �I OI Ce LLV) ❑F LL LL � LL m LLF LL N LL m LE LL LL � LL LL EEE aU Q U o 4 U J U O 0_1 U O U J U u O O J U O U J O V 0t 0 0 0 = .E N o O n .E I H .E J -E _1 .E J •c I --E0 .E _, .E I •E J •c I E a tat E E o w Oma' M W E I (0 c":” 0 2 O m 0 2 O m 2 m 2I 2 m 2M 2 •E 2 -E 2 2 2 m— (4 W Q u) Oa 7I < < )my ) 'C )m UC Um UC UC Um U C .)m U 0. o 0. ) t U Q e J 0„.0 _o W a)wI cp a) „ a)01 a) a)CI a) a) a)wI a)= a)w1 a) o a) 0 a) a) a) W LL a 0 W , C N2 WOO W ❑ WO W ❑ Wo 0 W❑ WO W❑ WO LTJ cc LI f: W W W N2 rz 0 ZO 3 n n N- N- .- n r-- .- r-- .- n r-- ‘- r-- .- n n n n n I,- ,,. T- CL - 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N LU CO COIX 0 _ CO_ _M M CO CO CO CO M M CO CO CO CO CO O. W W o m o Z 8 r-- 4:( 0 Qrs o o v o a),_ = '� J a EL O u) N. — , V O O c N o `o O 1 E V ti V o J M N Q CO 9 to to G > r Z n 5 Z 0 /y2� ' N a W com M co LLJ • a) v+ I O m ❑ Q a ° a) Q o a ZCIO E 0 us (gyp cn m (6 f0 U Z u) V) (o N (0 (0 N (6 ( co co co (0 ( co co CO ( CO a) (0 V (0 (0 (0 c0 (0 co CO CO (0 (0 (0 (0 CO CO (6 0 CV !❑ (0 0 0 0 0 0 0 0 0 0 0 0 0 ❑ ❑ ❑ 0 C) (6 2 (0 co (0 co co co (0 co (0 co co (O CO (0 f0 2 rn o rn o) o) _o) v) _m o) _m _m a) co o) En _I rn o O ❑ O J O ❑ ❑ ❑ ❑ ❑ ❑ ❑ O ❑ ❑ ❑ ❑ ❑ ❑ J co > O) O) co co co co co co co co co co co co M M M M ' v v n n n N- n N- N- N- N- n n n N- n n n C‘17, F M M M M M M M M M M M M CO CO CO CO t0 CO 00 CO CO CO CO CO CO CO CO CO CO CO CO OD CO CO CO N N N N N N N N N N N N N N N N N N N r. r- 0 0 1D O .�M- U U 0 0 0 0 0 0 0 0 0 0 0 0 0 U U 0 U V O d ❑ ❑ o 0 0 0 0 0 0 0 0 0 0 0 0 ❑ ❑ ❑ O Q d 2 W J W W W W W W W W W W W W W LU W J • • o - • O •.. cV > N Q) Q) • , d O_ U X r-. to O O7 0 o m O O T T T >, >' M Z C J = J = C J = J = Z _ co N _U Q Q 0 Q 0 Q (n (n U (n `° ._ as ._ a. ._ Z. ._ Z. 'O C 0 o 0 o a) 0 o 0 o c c c c z in > o Z+ o - o a O o O o it LL LL LL � O O _ _ _ _ O -.: 6.E E �1 E �I E E �I E u)1 2 = 2 2 Z mmmmcU U U) l l l l Q N 1 I I DjQ0 QI0 I0m 22Qm m m LLw g H w 2 Hg H a a a s (I) > YI > YI jYI > YI jYI > YI > YI > YI > YI > > > > • H H F- rn H H H i- 0 Z J NH NHN J N J N J N J N J N J O J 6 N O N = Bm I 7. 17f I aI ILL=ILLN Q = @ LL = LL = LL = LL = LLLLLL == z = = LL LL LL it C Q rn Pm N Um Pm Um PCD Pm co Pm VCO Pm Pm U c..) -5R, U U d Y m E la E 1 E 1E E 1 E 1 E E I Q E I C E I E I co- c c -c E o o 0 ,- m O 0,- m o o Oe- -p o 0 ,- -0 O-� O - 0 0 to B .6m= m '..7. E00 m m o .6m = m m o- m m a O O /'�/ J O W O O 11 W N co O O W a' W O N oao O N coaa) W O N co N co O N O O O O N V IX Q E WOQ WO WOJ WO WOJ WOQ WO WOJ WO WOJ Ea Ea W W o0o Z t` r-- ,- r- r f` r r- f� r r N- r` N Q. P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 EE N N N N N N N N N N N N N N CO W M CO CO CO M CO CO M M CO M CO CO M Z roe 0 d n r; �. ar W w a J d Co) CO P U Z O W Q 0 a N O. @ co C C a)N O 0 O N O N a E U � c- (...) J Q 00o. I- > a F- 0 _ N Z0 0 _ N > O N Q N c Ca m M r /_, 0 N co V/ QO Q co _ Q W ° i— Q o a Z E 0 E m z m co co ca co ca co co co m m mm m m m co m m m m m coco m m m m m N ,0 0 0 0 0 0 0 0 0 0 0 0 0 0 c o) i- O o) i� m m m m m m m m � � m m co 1.En> :� :.5) rn 'o rn m o o m oa 'co o O 0 D D 0 0 0 0 0 0 0 E C"> v v v v v v v v v v v v v - w r N- r` N- N- N- I` N- r r• N- r r N C r ~ M M M M M M M M M M M M co co CG c0 CO co of co co co op [O CO 0) co W W Cl) N N N N N N N N N N N N N N N N a a) (0 0 o a z o C U 0 0 U U U 0 0 0 0 0 0 0 0 O 0 - E 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 d d 2 W W W w w W w W W W W W W W 3 , i • • G I n C 1o N rz co z } } } N O j a n 2 c H o) Q o a o s F. v a I Q m a) 2 O 0 m O 0 J -J 1 t• O z (1) I i >-.. } >- (0 < u) m p Ce _ @ 0 2 a 67 O 0Ts ca a • 0 'm 0 LU d IX O °' us a LE E W K a) u; w UJ0)J a) rn a V m q - J E Z V ,- (A w co a ° 0) 0 0) �, _ 0J a c J d E 0CL m 2 0 0 L7 O `V -a ti E Qco V N U c Is- m o 0 } OE w ICC co co Eo °' V ez 03 a. CO n E z O co 5 cI G N f0 Ca Q N c aNi E m M O1- E UJ w O 'AII O a) c 0 a) V+ p p • a) 0 0 • C O re a 0 a °• iI I CI E o 2 o coz d til c. m • CO Z N N jl, W p L M (� N N M�7\� �C.J O �J M j W m ~ ce 47, W E a O 1 m N W C N m r c z N (o N = N a) p 7 F' C Z C CO O N V O co Q O CO 2 O O C C U w J r) a) .- m U ,E O a O a H E .a O W O O` a) O 0 T. d i O O d a 2 3 0 n. C9 0 0 p 0 0 RECEIlIiID • 21 66 1 1 3 JUL 13 2017 2 8 3 7 3 BA ER c PRINT DISTRIBUTION LIST UGH a GE company Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc. BP Exploration(Alaska)Inc. Petrotechnical Data Center,LR2-1 DATA LOGGED T its/201 Z WELL NAME V-08 900 E.Benson Blvd. M.K.BENDER Anchorage,Alaska 99508 FIELD Prudhoe Bay Unit to acknowledge receipt of this data. COUNTY PRUDHOE BAY LOG TYPE GR-RES-DEN-NEU BHI DISTRICT Alaska --- LOG DATE March 14,2017 AUTHORIZED BY Paul Canizares EMAIL Paul.Canizares(a7bakerhuohes.com TODAYS DATE July 11,2017 Revision STATUS Final Replacement: No Details: Rev. Requested by: --- COMPANY FIELD/ FINAL CD/DVD FINAL P ELIM LOGS (las,dlis,PDF,META, SURVEY REPORT ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) CGM,Final Surveys) PERSON ATTENTION #OF PRINTS #Ur I'KIN I S #OF COPIES #OF COPIES #OF COPIES v 4 4 4 4 1 BP North Slope. Q I 1 1 1 0 EOA,PBOC,PRB-20(Office 109) D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. 0 I 0 1 1 0 Attn:Ricky Elgarico ATO 3-344 700 G Street Anchorage,AK 99510 3 ExxonMobii,Alaska 0 I 0 1 1 0 Attn:Lynda M.Yaskell and/or Lisa Boggs 3201 C Street,Suite 505 Anchorage,AK 99503 4 State of Alaska -AOGCC 0 1 1 1 0 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas *** 0 1 0 1 1 I 1 0 Attn:James Hyun 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 ***Stamp"confidential"on all material deliver to DNR 6 BP Exploration(Alaska)Inc. I I I I I Petrotechnical Data Center,LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 Attn:Dodie Stinson TOTALS FOR THIS PAGE: 0 2 5 4 0 M � 0 • r LO co r N CV IP 1® W gal `M0 Q= m Z 0 a 0 - o mca Q 0 Q JO Q Q I W RS Ce •— >% L E Qc aoooo = 0... co ID t 2 0- ail OZ `` Lo �' C coCC aa » o LL o N ' 1 • • H m ia 8 o i(ig igx. Z . Z . O 5 m M0 O 1.6 O O N N O Z N NLc) N N M 0to oh Cn m ,Yico O o) C/) f6 l0 O 6) r , QQc a -- Q. ^ C = U p > > U Lo N Q O O 0)) m O a O oCL a w CO 00 N U N Y Y m Y N A K a N w J J ? „,a) ) N ,U a s z < J a a) > > U 0 0 0 E N N N a)) > > Q Q E 3- co 5 co ui J c 0) rn u o ti • 0 0 j .c Q N . J SS d D D a0) a c O 0 W J J a 0 > W 3 O V ii; .�. Of s • -a E L J J C7 t f.,....-., w N a m 2 c c F o O N CV U 2 2N 7 Ti co s. d U A v it O O w ` m U ci p > > c W c N-UE N fl O mT R r _ o.. 0) LI) p C Z « > co m m N m0p to O co pJ z co p N OO t OO O O O O O r O O W Q VI CD O O N a as 0- a ce O to Q U) L. a CO a m o U) 3 $ o Co o •,11 W V o0 ii I- c + y > n ,., c y co Ill c O) A t C 6 •O c r y c C y O o a, L . Z w CO y — 1-A;m 0 z w 5 0 9 O d N O a 1- U cii Q co 0 n o Q *�, N N 0 m N R N`s L .1.1 a pp> 0 v N d Io V 2 o. N F A CC C to N y CL O` co t` Q. O — A as a N i- N N w N N .r. m 0 RI Zi_. Q N ' N O O O i"B N N Q Q O O O O CD 0p H CO m N h N -p 00 N N J O = p a A CD Q 7 0 CJ m 0 O d 03 CO U cti >. a Z *O a a 1 ; o co co N E d N Y T N N 2 2 < o a A O O z W O 7 m o co o Q Z Z + z a a > > > c c Q. E Q. L E N O O cc Oc d Od o o >) m E 6 a n • > N .ci r o. yC.L NOO • yO y C Z C N OA OC .15 T N y• •O• OrdyOr d O n .3() ` d ` A A O r T d N0. O )g R 4 • • IF y -- _-- 0 n N- 0) 0) N n v v) n 0 M M v) x- n V CO m W 0 0 M N (0 O 0 CO V (0 O n O CO () CO O O O O M O M 0) co M V aO M CD (0 0) U At 101 r N N N M V (() N O O IN CO I % NEi2 N N � 2- O 41 N N Ca Y Y COCO0 M N ()) n N n O 0) a) M N V O 0 CA a a 0 d O CO V n 0 CO W N V CO n V 0) u') U) N 0) CO U o O O O r N O O O o o O O N M V O y N z e 0 7 < up up co N 0) O) d 3 N: r 0 0 0 0) 0) 0 Ca CO a Y Y 7 Y Ce (0 N0 N N 00 0) V N 03 (0 0 M N 03 CO 0) CO J J 2 0) W V M n V U) V N N 0) CO N CO N 0 N 0) Q Q 3 Q 0) 0 U) 0) N- n N n n — M V 03 (() (() u) V s- D n 0 ' 00 0) 0) 0i 0i N 0) M O M ui n V n N M O3 F- I- Y (0 (0 (0 (O (O CO; N U) N V V CO N N N O 0 0 0 E 0) Er, (0 (0 (O (0 (O (OV CO CO (O (0 (0 CO (0 (O CO CO (0 CO j Q < 3 D x 0 0 0 0 0 0='- 0 0 0 0 0 0 0 0 0 0 o O E .N 0) 0) a) o 0) 0) rn rn 0) 0) 0) m 61 0) 0) 0) a1 6) N O co O 3 C 2 (p 3 u) u) (O (() L CD N (O Cn N N v) (n N N (n V) N) H W W O Cn N- V c- (n CO 0 CO CO N V V 0 N N 0 c- CO CO IN CO CO CO CD 0) N- N- N n CO N 0) IN IN CO IN V CO N V 0) N 0 (O ct 0) IN IN N hi n n n CO O M: O N M O O n V M (O N M M M M M N uO N- n V 4 V N) ) CDO CO 0) 0 0 v0 C W 0) O 0) 0) O) 0) 0) 0) 0) 0) 0) 0) 0) 01 0) 0) 0 d t (0 l0 A lQ l0 L 0) 0) 0) 0),w:'0) 0) 0) 0) 0) O) 0) 0) 0) 0) 0) O) O) O d CD CD (D ffi O O (O (O co O (o (O (O co (O co co n w G) h N N N N 3 W 0) O 0) 01 0) 0) 0) 0) m W 0) 6) 0) 0) 0) O 0) cuE 2 2 2 2 2 Z v vi 0 to- (ri vi vi to- to- vi vi to- vi vi vi vi (n to- ui d c () 0 0 0 0 0 0 v 'm - > > f =▪ U d C 3 O O > > 0 0) U) u) r 3. 0 n IN N N n CO 0 0 0 O L C AV N C N C C C C O O ,O O O O O N 0) N (O 0 0 (0 M N n 0) 0) 0) 0) 0 O 0 0 0 O M 0) tri n N V) M O M O O N N pdyY w m Rm , , Rt N N M V V V n Cn (O U Qd l d r 9 C co C (n CO CO (n N I. N 0 y J 1 2 CO c c ^2 2 2 2 W • + = + + + + C v LY v a' 2' W 2' 0 d (L d LL u_ LL LL 1' 3 + 3 + + + + O ,— ,— n M co U) 0) V 0 00 n CD N CO V 0) a_ �d p 0 0 0 0 0 0 O O N O n IN (D 0) V n 0) n 7 N CO (O n M > > > > 0 0 0 r N 6o V O O N 6) n V 0) N co d T T > > > - N N N CO V V V N CO CL m > Z 7, 2, n . ❑ < Q Q Q Q 0 U U U U C 0 M U) CD CO (O N (N CO W (N a0 O N 1 N (� (n (n N N CO N O V n O 0 Cr O CO V N n CO n (n 2 (i) 2 2 2 2 . o ri N- ri 6 v (Ni (D 6 6 vi N- 6 (0 co op 4) 6> + + + + + C) (0 Cn C( V V M 6) N N Cn 0) V 00 u1 C) E } W LL LL LL W _ N M V CO N CD tD n tb 00 OD W 41 O a en 0 r} Z I° 0 2 0 2 2 2 2 r2 N N (00O n n CO V N- CO u) (D (O n N (0 m m d LL n n r (C) -.00 ''Cr (0 O) 0) V. CO co r) s- co N s- CO d 0_ a3 m0 co (O N- u) n (N O M n N- ((i N- 7 of O CO CO O d m V 00 CO (n u) V V O M O) N N N 0) M OO N O O OD d I— N M V N O (D CD n 03 O 0) 0) O 0 Z c3 v v v 92 7 - o U 8 - v o N O > (D C3 ❑ ❑ ❑ ❑ 2 ❑ 0 c- N 0) n n N- n N CO V N n CO CO n n (O 0 N c- M N CO 01 N CD ti N (n N CD (O N CO 0 YO O (Ni N n n n n n 0) N co O O O O co " CO (D `NM -4. M C9) O O M M N MN N MN Mii WHN 3 o0 o O z Q , E ^a WI d T 2 T S 2 2 H `. ... a n oc0003mma m N N T m m m m m m m Q d a a a a a d N 2 co O W CD (O O 00 N CO 3 0 0 0 0 0 0 0 CO0)CO CO O) 0) n CO O 0 Cr CO n N- 0) (q 0> > > 0 N Cn n V 0) n CO O u) Cn N CO n CO u) � O n Q d. co CO O CO N M N O O O O M ui ui (D (O (O (O (O (O n O6 M co CO N 00 CO 0) CO (p q 0 N N L V O O U T 0 V0 V Cn CO N V l6 E U) W O ' W N V C E d N H N N O O , .,- < o 0_ ) -c o 2 m 0 0 0 Z d d > > > N N ,. 7 to M n al N O N LO (0 N (0 O M n c- O u) u) W Z /�� n n n N 0) Cn 00 0) CO V N- N 0 0 U) (n 11. lirfl� E Ona o CO (p COON. 6 N: (n N- ri O 7 OD W M OD o OD 6 O r p ` 0) co 0) 00 M Cr CO O u) N Cr V M 6) N N CO 0) 0 0) 10 E 0) N N O O N (0 N CO V (n CO CD CO n co O O) 0) O O O� in 2 O N ❑ ,'� h C - lL IL E v n co G V O C d >, ^O E Y d N o 3 3\ 0.1 O • 2 0 O. V) 0 L 0) -- 0)) M • • (0 M O) O N- N M U) U) a0 M U) O O N M V N N- V co N O) 0 M CO WO 0) — — O CO n a- CO a- 0) 0 O CV 0 o CO N- v n o n U) a0 CO co Z UO a v (h M (V U) co O N W U7 R of OD OD N- (D U) u7 O N o Oi U) O) a O 0C) M N f0 U) a0 O N V OD (0 0) M N� (O N- a0 O N M N N N M M co co V V V U) U) (O co co co N- N- N- r -S Wu; 0) d M N y N.- r > V O MQ N N 0 W Y Y co O CO (0 U) 0 O M (O (0 M O 60 V V n M CO N- N N CO O U) U) N CO U) a 0 O d V U) U) V CO CO (D O) (o M N- N- U) U) CO O) V O U) CO a- a0 V N- O N- c c) (0 (O N ,- N ,- O 6 N6 6 6 N6 0 .- 6 Ni U) U) U) V M v O Z to N Q 01(0 U O O m z N: N- 0 J O O CpD\ 0 O O V V a CO CO m . Y x w f6 N J J Z N C) V O O (D O 0 M U) a0 ' 22 U) N) V V 2 00 w O n a0 N U) M M N (0 (O (O O) N O N- O) N U) aD M M M o O N N N Q Q 7 Q O V O ao � CO O O co � V O �{ co N O V) V n O .- N O U) co co co D 0 U 0 N O O) M O) W N. (h N- N N- N U) j Or D 0 M O O O U'— Ni o O O H H Y OOco - - N co .- O (0 U) V co O U V E UtaU) UUU) U) U) UUV VV Vds N-M -: MN N N O eO D r O U) r QQ 3 _ 0, ,,00, .g qo 0 0 0 0 0 0 0 0 0 0 0 o - 0 0 0 0 0 0 0 0 0 0 0 0) O OOOOO OOOOO 0 CO O O O O O O O O O CD UN N N N UU) N UUU) ((R U) to U) U) U) U) U) N. N V O) O CO O) N U) 0 0 N. M O M N. U) 0 CO CO CO V O N M N CO UD M UO N- W now 00 vs!:k n UO U) O) N O co UO M M O N� V V CO CO U) 0) O N V V M � 0) 0) N 'R U) N O CO U) V UO UD O) •a 0O0 UO NO 0 O0 NO 0 O .o'- U.- Nr Vr ,- ON � ,-- N ( W 0 n °4- 853t0'O OO NMMU) W OMOOONV `"N M Log M VVUV VUU) UN 0 OL LO OO OO O O 00000 E so 00000 00000 d W C O C) C) O^1 O0n.) 0)) 0) O O Q) 0 0)) 00)) 0)) m C) C) W 0( W 0( O T O) OC) C) 0)) Z U) U) U) U) U) U) U) U) U) U) 6- U) N U) N U) U) U) N U) N N U) U) U) U) U) C d O A N . U N 0 N 7 N M 0 O M UO 0) N- CO V N O) N. V M V CO N CO N C U V U) (D 0) O (O N CO O N U) U) CO N O CO CO N- V CO N CO V V 0) M V co O i: w A O) N a0 V CD O) M 00 M M CO M O) r (O U) N0 UO (O UO UO 0) M N O w N U h UO t; aD a0 0 N V r CO N CO (O O C) 0 N U) CO r CO 0) 0 U d O T co ( ( ( ( N N N N N M M M V V V V V 1 'V N V7 � .0 L d .O J Z N - z=_ o00 n N CO 0 CO M 0 N U) N- V N ':N- 0 0 CO O (O M N UO CO 0. U) N- N r O CO CO N CO O M a U) N O N N n O O U) CO CO N u) co (O M N O V N 0 O N- O (O O U) U) v v v (D O M UO N O 0 CC IL.- N- CO 0) 0 s- V N. 0 N V U) N. 0 CO UO O N U) CO CO V U) N- N- 0) s- a- N N N N N CO CO CO CO V V V U) U) U) U) U) U) U) CG E m j Z 7 ---1-pc n U) C l.L N. N (O V N CO CO U) 0 CO V O U) r 0 co co U) W M UO U) O co CO U) N N .- UO CO M O N r O N M CO N. CO Cr, .- .- N V V CO CO (O O Ni M N M00 - V ,- M O m V 0 V O) 4 0 U) UA r V O M O V N- 0 UO V CO N CO O V M N 0 CO N- O V N U) CO V U) N. 0) O N N CO V U) CO CO (O ` CO CO D O N CO V V V UU) U) U) a . a— N - N NNN NCiN aO N N- O N- M M O U) M O V O UO (O N U) L.-. O M UO M O U) V CO M V N O CO CO CO O N O O N N N-"''ice N O U) M V N O U) U O O s (O Vi O (0 (O co" 00 N r N UO M N- U) N O O a0 t` V O U) V M N O (O O V O UO N- U) V N Uo a0 O M V N- - N N N N M M V MCONNN W C3) 0 .- .- N M V U1 U) U) O O O O 0 �^. .- a- e- .- .- a-, N N N N N N N N N N N N N 1 N N. M CO CO CO M CO N N N N M V 0 0 CO U) 0 V V O N UO V N U) (D O O O M O N N N 0) O M N U) O O M V V U) O O N V O O O O N Ni N O O O) O) 0 iO�•,U) 4 O O) O O 0 N N M LM M M M PM M M N. NNN NNNNN MM MMMMM MMMMM7 E . co WI Q u O O co N. co co O O n 0 U) CO V V N- U) 0 U) CO V V CC) N. V (0 N M r U) M N O O O N. '- V O V N CO UD N- CO O N V .-- U V CO ▪ ,- m W N N N N NN CO NN M M CO MQ N N NN NNNN CO CO O >. O �. CD (0 C :. (0 Q• O 0 r V CO CO 00 O ` to 0 0 0 Z d Nl > > > N_ CO N O CO O O V O M 00 U) O n UD U) O O N. ,- M CO O CO Z CO CO V O CO IL. n O CO O V N. O N M V O CO a- CO. CO O N O M � L. Ui 0 o v 0 0) c (o v o v ao r) n (0 o tri oN v r) o 0 ao U) aO n O O U) UI UO O O O ao a0 M. L UD UO CO N Ul C) O M 0 '- `-N r r r r r r CO OD CO O O O r N M a U) CO CO n n r CO.. CO O N N N NICNINNN NNININN CO. () 0 N 22 y0.. N. (a O C: T D• w .. a NO) a o O .O N N 0 =oo_ corm co p O) r • 0 Ca . N 0 N r-- 0 CO M Cr CO 0 f0 0 0 N 0) Co 00 CO n N N Cr 7 co N U) U) CO 0 n N 0 0 U) 7 CO O UI e- OD (0 0 N 0) 0 7 7 U) 7. N ,. _ (o ri ri (o w o (n Di CD r o N ci ca n of 7 co o N0 U) 7 a 7 n n 0 O U) O 0 n N CO M CO M CO 7 CO O U) O U) N- N n n CO 0 0 O O N N CO co 7 7 ( co (O n co_ co m `W; u C• N O i v O N N U) N. n Q is-1 N Y Y 1 0 N (0 N U) 7 n 0 0 O N 0 0 N CO 0 N CO 7 Cr 7 OD 0 CO a a 0- U U 0 OD LO 0 e- O 0 UOD 7 N 0 CO n N7 •OOO O OO OOOOO 6666 0 ) O N CO Z U 3 3 Q ul w LAI 0) a) 0 t.: r; o o 0 0 0 0 _ m m a Y Y = Y d' cc N N (0 N- O) O 00 M CO 0 N- OO 0 n M 0 CO U) n (D M U) CO CO n 7 J J Z CO e- N- CO N n (D 7 00 O 0 M 0 7 7 0) U) CO n CO 00 N U) 0 Q Q 3 Q a- 0 00 N M O n e- 7 O N U) N 0 r- (D O M M O O CO e- D D 0 Ui (p OD N CD O) O) O O O N (O 0 7 O) N (O O) N OD O CO co o F- F- Y O 7 N N 7 n M 0 U) N CO 7 :0 OD N 0 LO CO ,Cr 0 n M O (O N O O 0 O) O) co co (0 N- n O CO (O U) U) 0 7 7 7 co co > Q Q 3 E x O O O ci W O O O) O) W o) 0) 0) OA a) O. of O) a) W of a) O) O) ai a) w 0) 0) 0 0 0 ao coCo coco "..co a) (0 a) co ao co co a:, co co ao co co — W co (U N 3 U) U) (O cocococococoU) 'N N U) U) U) U) U) U) N U) U) U) U) N N O O ` F- �W W U) .,. N CO U) O N M U) n n n e- 0) N 7 U) O0 M 0 0 7 N N- N Cr CO 0 7 0 0 U) CO 0 O_ OO CO O n C) N 00 O n n 'V' U) N 0 CO U) OD 0 CO CO N CO CO I- N n n O M e- U) CO. N V U) N Cr y n O O 6 O N M M M M N 7 N 0 N U) N O) o N U) n O N Ui O ii O N U) U) 0 U) 0 CO n U) 0 CO N- N CO O 7 0 CO n U) O 7 C O p _ co U) U) U) CO Oa O n n CO CO CO 0 CO 0 O _ _ _ N N M CO 7 7 i t L S.' O o o O O O O o o O O O o CO N- n N- CD n n n n N n N- n ' 'NN N N- N n n N- n n N- N n n w d .3...0 co 0 0 0 O CO CO 0) CO a) O 0 0 0 CO CO CO 0 0 0 a) 0) 0 O Z to U) U) 10 co- U) U) U) co- co- U) O. O. U) co- U) U) U) U) U) co- U) co- U) co' O OU p CU O) C 3 0 co M CO 0 0 N N N U) O n N U) 0 N CO o CO OO Co n 0 0 'O C U d 0 CO (0 n CO 0) M OO n O N n CO e- n CO n n M O V N N O CO O k. i N A O 7 O U) 0 0) DD O co OO 7 O U) o U) n 7 O O W 7 O a) () N M CO co a0 N 0 CO M n U) O CO o O CO n O 7 co U) OD N (J 0) w K • (( N U) N N CO CO 0 1- f� CO AO CO CO 0) 0 O O _ _ N N N M J• -, Z co U W - 11 �.4u U U) O Q nM 7 IM� 7D 0 O 0 n7 N nO r.#` I. n0 O N U 'n o M 2 '0 0 0 a) Ui a) 0 co 0 N 7 7 4 U) 7 n O M (0 0) N4 (O O) N4 n O M CC 0) co coc0 N 0 CO N OO U) CO CO (O CO N O U) CO CO O N co (O 0 (0 (D n n co 00 CO O 0 O O O N N CO : : : : :COCO 0- a) co giisMarif:6 ITi CO O N OOnNN WNe- MN (O i. 0Na07O (D LO CO N N (O 7 N O n U) N O (O (D M U) 0 0 7 N 0 n U) N O n N U) O OD (O n a0 0 0 O r N N M V., U) N 0 n 00 ::)566 0 0 O e- N N CO N N N N N N N N M M M O) M M.., M C) (') M M M M 7 7 7 7 Q 0 co .r 0 0M N 0 CO N n Co CO co U) O c0 O U) N o N- N OD N o CI) 0 M ch U) o N (D OD N 00 cr. 0 f0 n 7 ' M N n O 7 7 N• n n n U) 0N 0 7 o n N N 7 O O N 67 N W 7 0 OO OD N N co 7 N 0 n U) N O a0 (O M 7 0 O 7 7 0 n 4- Nor- CO NOn(O n N n CO0 0 o N M M 70 O O n co 0 co O e- N CO CO N N N N N N N M coM coM cocococoCOCO' M M 7 7 7 7 7 a p gl 7 U) U) o U) CD N OD CON- 7 COO 0 00 0 0 n O 0 U) N 7 0 0 N.; co CO co e- 0 CO 7 O NCD Oo N CO n n N O O n M O 0 O U) U) (0 U) N N.: O 0 ` O 0 06 0 0 O0 o 0 L N N N N N N N N N N N co co M M M M co co co co M M M M CO COM M M M M M M M M E 'N ='V a A IM � CO 'N Q 0 N M CO n CO N- o OO N- U) U) 7 N- CO 7 N 00 U) N N N 7 7 7 N e- e- O 7 7 (0 Cr Cr 7 CO O O o ,- 7 O o 7 7 7 O e- CO CO Ci M M Mui (D (O (D (D (O (D (D (O (O (O co (O OD (D OO (D (0 (D to (D {Q co co co CO CO CO CO co co co co co CO M CO CO co co co co co co co co co U N V 41 m C c Q 0 Q_ z L .0 0 E m 0 0 0 Q Z d 0. > > > OD O e- 0 7 U) o N OO N- N 7 7 N o 7 Cr U) M N 7 7 N N CO Cr Q a N- N W 7 M O 0 n N U) r O e- O M n n O CO0 n coM 0 0 n COaD co \i fly N n n O N 0 7 O) Ci 00 Oei (O OD Ci co M co O 600 (7 0 M n N n 0 7 o _ o 4 7 M M N N O O O 0 CO CO 00 n CO (D U) U) 7 7 M U) CO LL 0 0 7 N M cr U) (O n CO CO 0 O e- N M 7 U) U) n o 0 O U N N a N = N M M M M M CO C') COCO M COCr7 7 7 7 Cr- 7 Cr7 Cr 0 0 C R G U ip C.. T 01 Cl)d dNO ✓ d v oin o L j O) N, N. N • • coO CON O U) CO 0 CO0 N- CO CO0 M sr CO e- U) m co co N W N e- v CO O CO CO M e- U) v, N U) N CO v CO N CO CO CO O co co N N CO Op O oi O ^ ^ N O M 'pZ CO N N CO C) OO O O O r e- N N 7 M c N U) O 4 h N6 N aN0 N OM O r 0) N M 6 WO Mco N N - N N N N N N N N N N N N N N N N N N N M M M M M ch O Z N N � �"' O Q NN U) Cill YY co co U CO N CO CD M GD C) M (O M N N CO V 0 0 CO N 0 N CD CD a s d CO U) N v N 0 N N M CO N V0 N N N M N N N M N O N N U O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r O 0 0 0 O o Z a 3 Q U Lc) 0 m o J 00)) 00)) 0 ❑ C m m N ru d EN CO co N V CD N 0 U) V0 U) N N CO U) R U) 0 M N V U) U) J J Z < N CO N U)U) CO O N N 0) CO N 0) O N U) V V- U) N CO UD 0 N CO 0 V ( D CO M N U)CO CO U) CO O M O O CO N U) U) M N N e- e- U) e- sr D D U . co 0 e- N N U7 V 7 U) CO 0) V 0 U) 0) N O 0 M (O UO 0 N N cc; co F F Y UO U) N M 0) U) N CO CO (D N..,..(O .U) N V ON- M C) U) N W Cr 0 O U 0 E U) < 0O0 .- .- O O O 0 O CO CO CO N '- CO CO CD U) U) a v v M co co Q Q 2 C) •— NC 00 o) of of 0) 6i 6) co- co' co- aom co-a6N-4o Co co- 6Co Co CO0CD CO- Co Co E U N (O O UO 00 UO CO 00UO UO UO C003 UO co W t0 co co co CO CO co to co UO co UO 7 co co U) U) co N N U) U) U) L. U) U) N 6 U) U) U) U) U) U) U) U) N U) U) U)oo � w w " co M V N M c- N 0 CO M CO U) V N U) CO U) 0 CO CO N M M V O) C0 N- CV O CO CO 7 O N V CO 0) CO M CO M, 0 N 0) M 0) V N M 0) N V CO 0) M M N V 0)`.4' N N N co CND (p N CO U) 0 0) O U N 0) O N N N N a N W 0 W 6 p) N U) co O N 4 O UD 0 C 'O co co N N U) O) M N U) 0) M 00 N _M U) C) C N UD N M N 0) CO C p C V U) N co CO (O N N co co_ co m co O O e- e- r- N N co co V `7 a co U) l L L e `" ,- N N N N N N N N N N N N N N U .t 0 N N N N N N N N N N N N N N- N N N N NN N N N N N NN d 0 6) 6) 0) 0) C) a) 0) a) a) a) O 6) 6) a) a) O 0) 0) C) C) 0) C) 6) 0) 0) M a) wC Z N N U) U) N U) U) U) U) U) U) U) U) U) U) U) U) N N N U) U) U) U) U) U) U) C) 0 O L fy O O 00 UN C) 7 UN N N 0 CO V U 0) N N W CO V 0) UN O CO V O N e- O N M V N N V O O e- CO N M V CO V UV' 00 ` O6NCUMnOO 0 6 U) N M 6 V O O M 0 co UN DO w wC) U N (0 ) M co V CO ;U) 0) N CO 0) M N 0 7 CO co ONU dT CO M M V C UN UO D N N N CDS00 CO.. 0) 0) 0) O O N N N MNLN N N N N N N N N Nm ) ) C ) ) ) ) C re t:3 00 co J 1-2 Z N ❑ W O V CN V O W UN N N 'i') N' 6O.,"."`�O7 N N M ON N N O 0 M 70.N O UUC0 N O DO a CO 0) CC CO 0 U) 6) M N U) 0) M N N (O 0 O) 7 CO N N U) 0 VCO N N U) CD CO CO N N CO CO CO 0) 0) 0 0 N N M M V V' U) U) N CO CO Q. > N = e- 77 7 7 7 7 7 7 7 7 N N N N N N N CV N N N N N CV CV N I CO Tts C Li= CO U) M 7 M U) U) O N CO N V NN 0) N O CO O M M CO 0 V N CO CO M V O a N O CO N CO CO N CO CO 0) O V N O O CO CO U) CO M O V 01 N N W4 O (O N r) a) U) O CD M W4 0 O N M W O N 6 O UO U) M O OD O MO O 0) m O 0) NN D) N 7 N N 0 M V 6 N CO N co co 0) O ,- e- N M V vt 0 CO N` N 00 0) O O e- N M O) V V 0 V 0 a a R U) U) U) U) U) U) U) U7 (0 U) U) U) U) O (O N CO (0 Q 0 0 1 M 0 UO 0) CO 0 0 U) CO N CO N 0) N CD N 0 N NU) CO 7 0 0) U) CO U) N M 0) V CO 0) U) N N CO .CO M 'N 0) O co _ O CO U) CO U) O N N N 0 C) U) O CO N N 7 0) U) N M OD 7 CO N CI() M 0) U) N N U) N O N U) M O N M O aO CO M aD CD 7 C) O 0 0) N 7 N 0 U) (O CO N- 00 CO 0) 0 r N N M V U) N (O N W CO 0) 0 N M 0 E V V V V V 4 a R N U) U) co- N N U) U) N U) U) U) N (O co. (O t0 CO (O FS 0 N U) O) CO 0 . CO CO UD 0 N 0) O CO N N U) 0) OD N M N CO O) N CO U) N CO O U) CO O CD (O N CO U) O N CO 0) M N O V V = 0 N (o a; co Co 0 u) N N aD 6) O O ,— O O O O 6) N ro co 6) 0) C) M M �°3u -N N N N CV -.0. MMMMM M RMMMM (N M M M M M (717/ E N CL os.. :'?#hep ' m .N Q a Cl) ON M U) 0 0 CO (IM (O O N N 0) UO U) UO O a) UD 0 M M C0 Q CO CO CO CO CO (O O CO CO CO N CO CO CO N CO CO N CO N N (0 (O (O CO CO (0 Q (O N CO (O CO (O (O O (D CO O O (O O 6O O co (O CO (o O O O O O 0 co co M co co 111010-30101 00101001 01001001 M M M M M MCI CO U >. V O C E m Q o a € -L6 > co CO co 0 co o 9 0 Z O O > > > U) M 0- (O (O O 0. N 0) U) CO M 0) O N N N M N CO COCO N V 0 Z 7 N e- CO V U) CO N U) O O U) V N CO 6) O e- e- CO e- N O co 1- N Ma N O N O 0 M N 0 tD 0 U) C) U) 0 4 6 M N. N (O C) p M N N O 0) C) W 00 N N (O CO U) 7 V V M N N 7 0 O 'CO) UD O 7 N M V U) U) CO N CO Cr) O e- N CO 7 U) CO N CO CO O e- N M M V' U) E U) U) U) U) N U) U) U) U) U) U) (O (O (O (O (O O O (O CO (O N N N N N N C N r2 j co U O C >. N O G p r d a) y 0 CV O CIC) CO • • IA I CO _ m 0 n a 0 N M n Co n (O OO 0) N (O N N. n 0 O (O CO u) N M O V O co N N CO CO V V CO CO N CO n n O u) M M CO ,. Z CO N CO 00 R n O N N O M CO O M 0 CO 0 n (D O (D 0 'p O CO co O (0 O co n CO 0 O M n N CO O Co N co (O O V V V v) 0 0 (0 0 n n O 0) 0)CO CO) O) O O 7 7 N N N N M CO C ((1 0 • `Ell.w M coM M cocococo M M M M M co V V V m v N q 0 iz N N 0 41 IN N m 0 .C._1 < N C) V N M 0 el'N 0 N 0 O CO CO CO 0 O) 0 0 n co 0 O) N O V M a a s d CO N C. N O N O O ,- O N O M CO N )- M CO n co V v O M v N 0 7 7 N M O O O O O O O O O O O O 0 O 0 N O N M O O O o ren 0 Z U (n (n Q 0C 7 O 0) m 0) m 0 0 0 M a E co co 7 Y (0 N O (0 O CD CO 0) CO 0 Co n O 0) M u) 0 CO 0 0 CO U) O CO N M 0) CD J J Z N CO O N M V n M CD Co R CO 0 CO IN O (O IN M CO CO 0 0 0 CO Q Q 7 Q 0 0 CO LO CO (O O N x- n CO V 0) u) u) O CO V O CO M N 0 CO D D U ( 7 M NM 7 N N CO M 7 u) CO CO n n CO CO Co n 00 N N O n CO co F I- Y O n co O CD CO 0 n V CO N N 0 CO CO 0 n V CO 0 CO CD OD NY 03 V O U 0 E u) C N N . " " ' 0 0 0 O 0) O 0 0 CO CO n n N CO CO CD > < < E .�• 0 coOcoOco0coO000 coo coOcoo coOconW co connm oo n0 concoo conco co conco co conconcoo 0 OO C) R 7 N (() K) u) N u) u) u) u) K) N u) u) u) co co co v) u) co U) co co co N co co N o o ` C > > F W W U) N 0) O co CO M U) N 0 0 N V (O M 7 0 CO 0 CO 0) 0 0 0 V• V 0) 0) 0 N M CO CO N 03 u) LO 0) 0) V 0 0 CO 0 Co 0 0 (0 N O 0 N O CO N n N CO CD CO 0 O N CO N n N- C (O CO C 0) O (n CO .- N Qi N M N O (O v- ui O (O O (O O u) O 7 (o M N N aD M n n M O u) N CD 0 V n V 00 u) CO N u) CO N CO 0) N CD O CO CD 0 CO n O NY C 'O C (O CO IN n IN CO CO CO O CO 0) 0 O C) .- .- N N N M M NY R NY 0 U) N 0 L S' N N N N N N N N N N N CO. M 'M...::M M CO. CO- CO. CO- CO- M CO- CO. CO- M M 0 t Co a) O m 0) 0 0 0 O o)n n n n n n n n n n n n n n n n n n n n n n n n n n n a) O 0) O a) O a) a) m a) 0) a) o) O 0 0 0 0 iv E re Z vi ui ui vi Lo- ui vi to- vi Lo- vi vi (n co- co- co- vi vi vi vi vi ui ui vi ui vi O. C 0 A W O 'sly E rm C C) iii V co 0 0 C 7 n CO N CO CO CO CO 0 V Co 0 CD CO N u) 7 0 N n V 0) (O N C C if V (0 'V N 0 •- a- 0 CO 0 0 N CD CO Co O x- n CO 0) (() CO CO CO 0 N O i C) w CO N N oO N M N 0) O CO (D u) V M O M M N � O (n O N ((1 n CO O O 4 - Q' U Ol CO 7 7 V VO) (f) (00 CO co ((OO conn n CO n co 01 NcoN003 O 00)) 00) 00) 0 0 O OCO� -- m C1 L 0 a N N N N N N N N N N N N Ni N N N Nvs" N N N N N M C) M M (? O ❑ J I- E 2 20 ❑ Wgl t n) n0 N V Vn Lc?-1 Co nn O VN M 0 (V*; ..,:-?0002 N 0 n(O O CO 0 O V O (7 M (1) ai V a M ai 47 ai 4 O u) O N (D O N O (n O co N co - n M O CO CL n vn) IT M CO O OM On O V 0 (n 0 N (N O N M OM M COV O N CO O V a N N y N N N N N N N N M M CO. M CO. CO- CO- CO co- M co- M co- co- M co- co- co- M m Z z N d C V 0 0 O (0 CO 0) C) CO 0 0 O •U) N 0 N V 0 CO 0 CO Li: 0 O co Co O N .— u) Co N '- 7 n u) n N n CO '- O Co N V 0 O O (n M N N NO N co O '- V I- a) N CO co O M n u) CO N M U n 0) N 0 CO O CO (D '7 N CO IN (O V N 0 0) IN N NY N 0 0) IN 0 CO 0) M V 0 CO IN n CO O O N N M N' 0,,X O n n Co O N COV u O .- N ) m N ^ (D (O (D CO CO (O CO CO ri N N C- N n ...N Nr N h: r OD CO OO CO CO 0 0 a O N 0 (D NY 0 CO V 0 0 CO (0 N 0 N CO 00) CD N 0 CO CI 0 0 0 CO n 0 co. n O co O (0 ,- n .- O co- nIN n M O M u') CD O 7 (O a) N u> n O cc?; 0 0 u) DO M O O 0 M O n v) M O n CO V N O O n u) V O 04s; o n v) M N O CO n L.7., M (O CO n CO 0 Cr, O N M M R u) CO n CO OD 0) O N M CO et N CO re CO CO (D CO (O CO CO n n n n n N, n Nn n n n CO co- 0 OO 0 Oo 0 0 cc V a t. O u) CO 0) M 0 0 R N CO CO 0 O (O V CO 0) 0) N 0 N CO n O V O V CO O (0 0 (O Cr. (0 N 0 CO ,- CO 0 N CO C) co r 0 (0 n CO Co O 0 (O 0O O O O O O O O O O O O O O N co 7 CO cc; a) O M M M M M M M M M c M M c M (+) ,(h M M M CN') M M CN') M M M M m .N Q CO N 0) n CO e�{{ 0 CO CO n IN (D CO N CO (O O V CO N co co ,- O Q co V O co Co n co co co a) co co 0 Co co O O O O V N- VN n 7m v) Q M M M M N N N N cci N N a; cci N N N cO N N N N oi N N N N N N M N M M CO 9 T V E co C 2 < o 0 fL co 0 3 m 0 0 0 Z 0 d > > > of co n O N (0 0) 0) n < M N (0 DO 0 N n O O Co n 03 0 Z CO CO0 Qf •p (0 n N (0 CD OO 0) CO N n CO 7 (0 CO 0 CO CO CO CO N OO N V C. No Ii 1� M n (D (O a a) M n N n �_ 0(0 U) O V O4 CO Nn CO O p Co n n CO CO u) V 7 M CO N N O 0) 0 0 n n CO V a 9 0 CO r co O O N M ' 0 CO N 0 O O O - N co cr (0 co r CO O O O N-- n n n n co- Co CO CO Co Co 0 Co co- CO O O O O O O O. O co O O O 6 ❑ r C d rL 7 n 0) U O E T O 3r;) O « d d .y 0 vain33 o U) co N • • . V V O V V V N 0) M 0 N LO Ln N .- 0) N N V CO N V 0) V 0 LO CO 0 W N 0 N m W 0) () Q 0 M r W O CO O r CO M d) N O M O 0 CO O CO N v CO ,.�M N V V N- W N M V co n M 6i U) W W a) O) O a W a) 0 N M c() N 6) CO U) CO 0 CO W a) N cc) W CO W L!) CO W CO W W W N. N N r CO CO CO CO 6) W of O 0 N 0- s- N. %a 1110 rn H v ..4- v v v v v v v V v v m IMMO Na0 r V 6. O �� N N c0 Y L O c6 V 0 0 CO N V W 0 M M N. CO 0 W LO a) 0) CO W V CO a) 6) CO csi 0)COaa s CD W W CO CO N. LC) - O - - N. O - OU)d O ohOKVUNn .- nU O> Z y — — — U> a Lo rn ^ p J oO O0 ❑ ,_ ©U a d Y Y =Y co W IY Ti N J J co V O N V I� CO CO CO N CO N 0 Ln N a) CO V CO 0 a) N. s- N Q CO V 0 N W 0) 0 N CO O N M W co j ? CO N O O N M L0 M CO CO L0 N W s- M N V. COWW N- CO CO CO N CO co D F V . •W N U) M O n M 6) V 00 N_ N W co 00 N 6'i N- OD r N- N- W N V M N O a) N- W V M a) R. N a) - V s- co c0 N a) W N O D U E U) C V V V V V V CO CO CO CO CO M,. N N N - - .- s- O O O 6) 0) 0) > Q Q 0 w c' N. ri N- N ri n r ri ri h ri R N- N- ' - h N- ri N- R. N- N. NZ U) CD- CD W W d £ m co W W W W W W W W W W W W W : co W W W W W CO W W W W .) O O ` C ❑ R .2. co N co U) cD LO N lO )t) N L0 N LO )0 I.0 LO cO l() N LO N N L0 cf) LO co in ill an N W 0 N h W N M c0 0 6) V 0 O 0 W 0 W V N. V CO CO CO 0) CO a) N M V a) N r OW 0 CO CO W N LO V N- CO CO N V N W N CO N O CO N N CO W O M N LO CO 41 CO N U) LO N- 0) V d V M M u'i 0) N W W m CO (V: 0 N M c0 N c0 N a0 N- W W O O N- W a) O N V cO n W O M 2 1` W O M V LO W N- CO W O G 0 C N cO N co W W W 4) W CO N- I` N- - N- N. CO W CO CO W CO CO CO co a) t `� co M co- co" co" co- co- co- co" co- co- M 0)" M M M M co- M M M M M co- co- co- , 61/ dl t' 7 °' o N 0) m Or) 0)) ON. ff) Off) 0)) N. 0)..0)) 0)) 0)) 0)) ate) N 0 Oni Or) Off 0 On) Off) 0)) ce Z N N tO cO N N LO N cfi L0 LO N LI) LO N cL) L0 LO LA LI) 1.0 LO N LO 10 LO a) O ra O C U 'O 0) 0M V 6N CO cO CO 0 h W CO a) L0 N M 0 N- W 0) 0 0 G gw O M M N co nW CO W W CO <O CO O m LO N .- CO M CO CO N LO O CO 6) N N- O V 6N O O O V W V 0W V M M M M M Maw d U W N. naO M V N n CD cg)) N-M M) N V V O U)M W ON N WW NNNNNNN VdN aT r -0 U, O t^. M M U) c?..M MM M M ch M C 6 M M T. M M M T. ch M M M U) M O >❑ Q t :{; LU O x' c')ngc J F- g 2 N ❑ w = > O N CO N CO W a) r 0 N N. a) CO M M CO N 0) h cO CO 0) N- CO N N Cl. V 0) 0) CO V CO N M L0 N U) N- N N a) LO 0) a- L0 0 a- N e- CO U) CO (I) CO V N NN O V W M 6 V 0i 6ch O N M N M V V M M N- Ct N` W O) O co V 6 N W O N M cO N W O N M Ln W N` W O) O O W CO c0 n IN n N- N N- CO W CO 00 CO CO a) a) 6) a) O) 0) 6) 0) O O a Nn NC CO- M M M M M M CO- CO- CO- of M M M M M M pi M M M co- co- M V V v cn 5 cc l.L 1 CO LI) N V N CO 0 a) 0 CO a) CO N W 0) 0 LC) CO CO V CO V CO r N N- 0 CO a) N W V s'- M O) M N- M V N N W ,- W O N N LO O W O Cr; N- N� M co O M M N O V 00 00 6 N 6 N N N t N O N M cD W V W W co*" cO N- W a) O N N M M M N N 0) r r W W W W W co co co W 00. 00 c0 W O co co O co co O W W 01 N CO CW co- co- co- co- co- co- co- co- co- m eo co- co- ao co- co' co- co- co- co' co- co- CO-aeo R CI Ch ON N N W =W 0 M O NNOM V N" O CO M W W' M WV CO)O 0O co O N Ni 0) UV CO r MO CO N W co W M - O O 6 N ON Om c0 M Ws. W CV W W 6) n W W W O O N N M M N N O O O r00 co- co- co co- CO co- co- co- co- co- W co- co- co. ai aI 0) 6) 6 6 6 a) 6 O 6 1 »rte. U) co an Lf A LO N V N rN O) 0) N N O CO s- N W CO 0) LO M M N LO N O N N V CO W 0V) CO M CDD VI M n Co an U) V N V U) V N .- Q W N- V N a) N- M N W W CO OD O 7 - .' CO+) M M N N N N N N N N N M M M M M M M M M M M M' ,.« Ti as r �� a m .N .. Q Y Q CO N V N CO CO 0 CO a) V N- CO LO 0 a) CO N V W a) _ M 6) U) N CO O) N V W CO N N CO CO O 0) CO CO V V CO CO CO N N CO Na. O O6 M 6 c0 01) O M6 O d' ai NN O6 ai M n O 4 6) N N M M M M M M M V V V Ln N c0 W W N- N- N CO CO 0) W 0) 0 0 0 a- CO 07 > 0 CN m C U <• o a a > co co co O 2 ro 0 >0 0 Z Z a a > > co co N N LO N CD a) n a) VN CO V 0 LI) 0 CO W W 0 CO N CO N CO COCla W N co V 0) W W CO N 0 h LO 0 0 V 0 N CO CO CO CO W CO 0- cfi O V V W W CO O N _N 6 r O 0) W d) M V N) W 0) O N4 W co V W a) N N CO LO CO V N- 0 CO W 0 M CO 6) N LO 6) N cO CO .,- s- s- N N N M CO CO V V V LO N W CO W W co n N N CO CO W O O O O O O O O O O O O O O O O O O O O O O O O O O O r A r r r cc) N. A O G >, O 1 0 c O O` r d d y = U a co ❑ co M • • . N CO N O O N O V O IN O e- O r O M 7 01 CO N u) O m m 00 N V CO CO M M V O r O co r N N M O CO. CO N t` n- 6 6. O 1* t` O O r O u) O O O N M O O r V M N O O O 00 N 'O u) co 0) N 7 n 0 M co CO m CO CO u) N O (0 m 0 r M 0 0 N N M M 7 V 7 u) u) co u) co O co co n co CO 0) O x- .- N M CO CO W0V u) u) u) u) u) u) u) u) u) u) u) u) u) u) N N u) u) (D u) (O (O (O O w CO v O MI Mr > 41 r O ? o co M 1 2 o co (0 (6 00a_CO M CO V CO 7 CO u) 0 CO CO O. M IN u) 0) N CO O M. M 0 0 0 a d — (O u) n I- N CO N O 00 .- O N- CO N O) e- M CO a CO 7 CO 0 N g U o O M N .— 6 N 7 ^ (O u) O) CO (O N M O N O O O .- M O O CO m z .- .- U U co u) Q 0) 7 Orn a o 0 J 00)) 00)) 0 0 O m m a Y Y = Y ce K m N W N 0 CO M N 0) CO CO CO CO u) 7 u) N M m NCO u) CO J J Z N O N CON CO I` O 0 0) M_ N co co CO 0 N u) 7 COO CO (0 u) Q Q = Q CO v V. N CO m o m (� CO 0 CD (n in (n CO O o A- (n n m (D m 0 ( 7 C` (O N- O N N U) 7 M N O O N- O u) N 0) N. u) N N 7 CO H H Y N O u) N 0) O M 0 n 7 CO ere.N N "M V (O CD (D N- CO O O 0 O Q () £ co O co N t` n CD (D CO (O u) u) N 7 7; 7 CO N a- O O CO N CO u) V) u) > Q Q g tY = <0 (o ro (0 (m (o co (0 co- (0 ro (0 (0 (0 m 0 co- (o ui co- ui ui ui U) ui — O CO a - 2 » 7 (OO (OO (OO u) (OO (OO (OO (OO (OO (OO (OO (OO LO (MO N N (OO N (OO (OO N N (0300 OO (OO ) O O L C p W > > H . w u) O N co N n 0 N- 0) h V 0 CO N 0 N M CO (O 0 O N O (O 7 IN O co N- O u) CO CO CO CO u) 0) — N 7 (O (O CO CO N- 7 N O 0) O CO N- N co 7 7 N CO m CO O CO. O O O N O N CO O 7 7 co y O O O u) O m 7 m O O 7 O CO CO N- N O n (O M O u) (D O V0) N CO N. IN CO O 0) O 0) O O CO CO IN U) M CO O 7 N 0) N N u) C a0 C O O O O O O O O O O O O O O O) O O CO CO CO CO N r n n Ii.! m t 0 co N ti N- N- co- N- N- r N- N- N r r- N N r r N r N co- N- n N- 4.12 O O O co a) rn rn O 0) 0) a) 0 0 0 0) O 0) O co a) 0) 0) 0) O 0) a E Z co- co- u) u) u) u) N 6 u) u) u) u) u) co- u) u) co- u] of co- N u) u) co- u) re a C U O C U C A iS:W.. a3 O C V d 3 CO u) O (O N 0) m 7 CO 0 N N u) N0 C0 O 0 U) 0 N a C V [O CO CO O N f� O 7 O N r O N O 7 u) u) O O O N O � w C7 u) N m N O N N r N O u) O O O N 7 u) co O N V (0 O O O 0 a Q N 7 M CO O N u) CO 7 IN 0 M Imo.«0) O 00 N- (O (O (O 7 M CO co r f� co CO CO co O O O O O y.- N CO O. V7 CO IN CO O O 0 re 'DL N . M M M M M M (�) V 7 7 7 7' 7 7 7 7 V V V 7 (n u) (n To tr J 2 Z (n p I W 711 t 0 0 :.3L, O uO) m .O CO m O N M O 1Ns ,0 O 7 M (O M N N N u) Q N 7 (IO O O 0 u) 7 u) V M O r 7 O M N O O O u) 7 N O O co IN CO O O 0 0 0 0 0 0 0) 0) 0) IN IO N 0 CO CO 7 N 0 0 co 0 0 0 0 O 0 0 0 0 0 0 0 0) O 0) O 0) O CO >. 7 7 7 7 7 7 7 7 7 7 7 7 .0 7 7 7 7 7 M co- M C'i M M co- a. d rn w ,%r m Z NN (n TtsC l.L O V O O u) v- N M CO (O M CO 7 CO (O u) IN 01 CO 7 O O 0 0 0 N.. N 00 CO M CO u) (O CO 7 O u) (O (O (0 O 7 O co M O u) O O O) N N 7 n m n N n V N6 O u) O ..4- O M O N r O O6 ) O N O u) u) V M M N N N N N N N N CO M 7 7 u) u) N u) u) CO CO CO CO O CO CO CO CO CO CO CO 00.,,:CO 00 „U) CO CO CO CO C7 CO CO 03 CO 0 ca I Co Co 6 ooo 6 6 6.Cco- Oo co- Co co Co co ca ro co- co- co- o 6 U) w co-O 11 1 7 0) O co r CO .- CO CO CO O 0 N 0 M 0) V M u) u) u) n CO O M N Cr u) CO 7 0) 7 u) ,UT 'CO CO O. 0 co N O N N. N 0 O O N u) Ou7 O N O CO O O N N N r O O u) r I` r` O I1 co co 7 7 co M N N N N N CO 0) V 0) u) N 0) 0) 0 00000) 0) 0) 000 00000 000) 00) 00101 0) 0) �^,�. CO CO- CO- CO- 00 00 CO CO- 00 CO 00 OO 00 CO of co- co- CO OD co- CD co- OJ OJ 00 0 7 O N N 7 V O CO N CO u) co N N O CO co O u) 00 O CD ,- co V u) N IN u) IN O M 7 r CO 0) CO M M O O O O 7 r 7 O n u) u) 7 N uN n N N N- N WL O O O CO 00 N. IN IN CO CD CO CD CO � �u) uN U) U) ( NNNNN NNNNN NNN3NNNNN N N N N N7 N V 2N CO/ 71 Y Q CO O N N- 0) CD CO u) N u) CO (O O N O CO N O O CD O CD 0 0 O J 7 co CO O O N u) CO O u) O 0) CO CO u) N m .- x- .- .- N I- x- IN N N N M m N O O h u) V O O N N N n r N N n N O O O Q O O O O O O O O 0) 0) co 0) co CO CO CO CO CO CO CO CO CO CO 0) O V >. V .. E U m Q o a 0. L L co co o 2 m 0 0 0 > Z 0 0 > > > O O O N O 7 0 m CO IN N CO M 0) m M CO u) ro m u) N- N CO y N Z pcm O O CO CO (O CO 7 m (D (O IN CO M O CO u) O s- n O CO 0) O V N K O O 0 N M N O O O N O O uO 7 O O .... O d Q. 0 u 0 0 CO N N a- O O O 0) CO CO 0-- n n O O) o N N N MCOM W 7 cou) coO N CD O O O N _ N F m 00 ` .— .- NN4coco 0 03 c E 2 1 'Cr > 0 U C 0 > O C.,- 0 0 m an d 3 0 k:...' • • . -1 O x- 0M CO W CO O CO CA f0 O 7 co n N N n O n 7 N N CO CO O .- u) M CO (O e- N r 0) CO O O CO N (O .- N O n O h N N CO OJ ,. O) V O u) n to CO O 0) O n 6W 0) O r 0) n CO O l0 O CO a 0) N <{ n 0 N u) CO CO (0 0) N u) CO N u) CO CO CD u) CO N M V V V U) N N U) (0 (0 CO CO n n n CO W CO 0) O Of 0 N CO M 3 -- E co- O co co co co- (D (O O co- O t0 o c6 coN O o O (O t0 n R n n n CO \-\ N co CO m nN > c.2; N to O Y Y 0) (O CU n N 0) n 0 0 W N (O CO 7 0 n CO u) CO 0 (0 n 0) CO 0) u) M n cL d d 7 V CO M 7 Co O) e- M n CO n CO (0 M e- n n (O .- n M N V CO p U ,- O H a0 N ,- V (O O O UD O O) n O (O O) 66 4 O . N H N CO u) a, z 0 Q 0) 0) y N- r: ❑ J o 0) 0) 0 ❑ o d CO CO 1:2 Y c Y to W co L0 e- (0 N- UO CO CO M CO O (0 0) CO N U0 O CD N N- 0 CO V J J Q N CO 0 CO N N 00 LO CO CO N- CO CO (0 CO CO u) CD CO O 0 CO O) Q Q 7 O 0) .— 7 u) t0 d) V .- UD (D 0) V N M (0 V O O O CO U) V 0) CD 0 M N n D n V CO M O 6' d" C 6 0) n n D N V M Oln O co H F Y o U U E N co_ nV V a M 7M CO N N N0) uN 0) o M 8 n) V 0aOD uo) n O L0n na CO 3 = (n (n (n (n (pv) 6L0U) nv) (n (nt. 1. a V V a V v a a a 4- _ <cQN N co oscoc000co cocoasooco co 3 N N (0 N (0 u) u) N u) u) u) u) (0 N N u) (p (0 (0 u) (0 N L0 u) N > > H a to v 0) N 0) CD V' M N- CO 0) N n M (0 n 0) V n 0 0) 0) 0) CO 0) CO N N O N CO N- CD O _ 0) CO N M n 0 (0 0) CD V V V CO CO O M M C0 U0 u) O O N 7 6) CO CO N O O) V CO M L0 CO O CC uudCOO uO i6 p) L0 7 V M CO CO CO CO CO M V V uCO n UO ) coO) O O O N CO CO MV p c n n n r` n n n 1` n r n n I- n n co co co ro CO a0 m co 2 t L `V M CO M M co- co- co- CO co- M CO M CO-.-'::`M' M CO CO- M CO CO- CO- CO- CO- CO M CO 6) N �' = 0) 0) co O) W On) On) On) conOn) 0n) On) On) O) 0) 0) On) coOn) On) On) On) 0)) On) On) con N N N u) u) u) N u) u) u) L() u) L0 (t) t0 N u) u) 1.6 N L0 u) u) L0 Ln (() L0 C Z a! m 2 p weiomma a V V N O) O) N LO 0 N- CO N a 7 N N- N- 0 N CO 0 0) 0 CO '7 V 0 0) p ` C w UV N O O O O. (D CO) N) n O) M V) O et CD 7 0 ) Oi 7 CO N) V) O CO 0) Or N W DD V OMUOC0OON CO MVMM 707nO co ,' O O O n U 0w Lm r N N N M M MM O O N, uuO CO (No- nO M nO aO ON O) ) )R ,2 d � ^• VVN UL;) uuIli uV) uu00 u0n uui U) VV ) 0 O CO co 6 ❑ ❑ lw ii0AR:Ca. I- OJ E Z CO 13 t o O CD N 0 N 0 UD Co 0) u) nCO CO CD n 0 u) 0 V n O) C0 O) 0 - CO N UO N CO N c0 V (O V 7 CO..o 0 V' M N O) n V N N O CO u) O) CO CO N CO 6 n 6 V 4 V' N 6 CO n O O) n CO CO Ct n (0 CO CO CO CD CO CO O O n N- 00 0) 0 N N CO M of u) u) CD n 0- 03 OD O CO CO CO CO CO CO CO CO UO 00 CO CID 0) 0) 0) 0) 0) 0) O) O) O) 0) CO 0) CI- N (/) CO. cO CO' COCO co- co- co- co- co- M M M co- co- co- M co- co- M co- co- M co- M M C (f) a^. CO C I..L u) n co N 7 O7 CO CO M LO M W t0 co co H N N N co n N n L0 n o V CO n CO .- M n CO O 7 N t0 t0 o CD CO CO CD CO CO 0) N CO N p W 0) O N CO (D W H N M V V N 7 V R V V V V V N (NI 6 6 Cto u) CO O CO CO CO N- n n n n N- n n N- n n n n n N- n O CO CO N co co co co co CO QD CO CO CO CO CO CO CO W CO' CO CO CO CO CO fA CO (O CD ap p) Nao U0 CO c0 CO a) CO CO 00 03 a) a0 CO CO CO CO CO CO UO CO a0 aD aO a) CO COa G N V d d )Z On N W nu) D R _ 2 O O aV NOTI w . nunuo n tO0 N OnD N 0 O CD n W O N V n W ON N N N N N n n n n arn rna, Ern a, co mrna) m a) a) m a) 0) a) co a) m ^ E 0 ao ao 0 a0 a6 co- co- 6 co- co co- co CO CO co- co aD oO aD aD co- co- co- co- CO `rT z UO O (3) u) 0) 0 CO CO 0 N 7 V CO CO 0 (0 V 0 L0 CO L0 CO 0) 0) (O V N O) (0 _ 0) V O O) V M M N CO n R _N CO V 0 L L(O C (V (nO On CCO O N Mn nn COO aN O O,. 0I CO O (nO n(O n LnA V nN Nn NNNNN NNNNN NNN ')'N N N N N NNNNN N E a 1J Q C/) N CO 0 V 0 CO 0 0) CD CO 0 CO CO 0) CD 0) N 0) 0) O) CD CD CD V (D V 7 e O O O O O CO .- 7 CO 01 0) 0) 0) O) O 0) O O O) .- N e- N Q O a0 CO N O o O O CO 0) co 0) 6) O 0) 0) 0) O 0) O) O) O) N N N N co a0 co co CO co CO co CO co co co co Uo CO CO co 0) CO CO UO UO 0) 0) 0) 0) CO 0 NN V �. CO aE Q 0 a C a > CO CO CO O 2 m o 0 0 Z a a > > > O CD 0 v v 0 a CO CD CO CO 0 0) 0 N 0 0 n Y) 0) 0) CO N n N Z u) O N 7 .- N 0) V co co n O V O V 4 CD CD O) — 7 .- u) M co 0) CO Ll) 0 03 O) O N V V n CO 0) 17 N CO (O n n O N N n 1H CO .- O cop o n 70 4M 4C0 70) uN (D u)0) CON O COO n nR nCb W ao7 mn 0)O M0) n OO OM N NN M N rN N N N N N N N N N N N N N N N N N N CO" M M M M M CO O C) C 0 - — 0) . C. p C >. O a) d W d 7 OnO U lL N ❑ CD n N M • • • N m iii O a ON poi Mimefn . Lo m �� , 00 a1 N N L0 02 N N (n Y Y d d O d O Qv 0 n Q y 0 ca rn 0) y C 0) rn 0 c J O ©@ nom. F.:- CO CO d Y Y j co CC a N N 0 J J Q Q = Q co > > U ' o 0 0 0 E (Yn a) v j = cc c E vtc > > r` Lw w '" Lo 1)) -c � 0) z 4 _ ca a � d d ,1 v .a co co C O C co co E L L N r m w cc Z N_ O) .. +O' C N (111 N (O c C• N U N O E C_ N ` w 0 > O .d `yam d U iy o) O O m K 0 L w a ,7,-,- .,.., 71 o>> r N O 0 J F r2 Z N 0 W v O)r -a .3':;. t'' . c N :,!- I's E v c N z 0 .i O r 0) CC n rn Er d a> v> +k "' - z v C ( 0°" To > o ,. 22 it — c m of d a_ o -O 0 E F t a� m m CZto co Enco- E o .o m fa U)o U > a N d d E o rN R Z Oi m rn m E 0 N W ` N V W cc O N f- %' .4 O J O V L NN (`M M j N + Z v .N a - co m N To Q O r ems-' O 01 (n CO Z. 7 COTo g (� > 0 �0rx (0 (o N .t d y W O 3 CO 00 CO 0 U N o -. (-1.1 O O CO a C V ` L N Q O V N a N - .co 0))al O d 7 L O f� L a 0 co (n • 'O > coW oo coOo I- o d 7 O.�' O ` oo 0 0 0 * N d M N -4- z Z d. d > > > 0 r C d 0 ► c tiz co V o ry �' Oo D O C ,.o c a - Q r, aricO . O) = HflhI (n U 0 N M I RE Ell ® 216 1110 1 1 3 JUL132017 28374 BA ER A S' C PRINT DISTRIBUTION LIST 1lUGHES a GE company Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc. BP Exploration(Alaska)Inc. Petrotechnical Data Center,LR2-1 DATA LOGGED 37 WELL NAME V-08 PB1 900 E.Benson Blvd. 20 M. K.B ENDE M.K.BER Anchorage,Alaska 99508 FIELD Prudhoe Bay Unit to acknowledge receipt of this data. COUNTY PRUDHOE BAY LOG TYPE GR-RES-DEN-NEU BHI DISTRICT Alaska --- LOG DATE March 7,2017 AUTHORIZED BY Paul Canizares EMAIL Paul.Canizaresftakerhucihes.com TODAYS DATE July 11,2017 Revision STATUS Final Replacement: No Details: Rev. Requested by: --- COMPANY FIELD/ FINAL CD/DVD FINAL PRELIM LOGS (las,dlis,PDF,META, SURVEY REPORT ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS CGM,Final Surveys) (Compass) PERSON ATTENTION #OF PRINTS #01-PHIN I b #OF COPIES #OF COPIES #OF COPIES 1 BP North Slope. 0 1 1 1 0 EOA,PBOC,PRB-20(Office 109) D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. 0 0 1 1 I 0 Attn:Ricky Elgarico ATO 3-344 700 G Street Anchorage,AK 99510 3 ExxonMobil,Alaska 0 0 1 1 I 0 Attn:Lynda M.Yaskell and/or Lisa Boggs 3201 C Street,Suite 505 Anchorage,AK 99503 4 State of Alaska -AOGCC 0 1 1 1 0 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas *** 0 I 0 1 1 0 Attn:James Hyun 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 ***Stamp"confidential"on all material deliver to DNR 6 BP Exploration(Alaska)Inc. I I I I Petrotechnical Data Center,LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 Attn: Dodie Stinson TOTALS FOR THIS PAGE: 0 2 5 4 0 ./ M • 0 e-- r CO t4 c- CO N N • 12 1z Mine `MO 4iiii= ® _ a W CO N 0 W -- C3 1 w � Q Cl) CC ..1 a J C a O. I W RS oc •- >+ 6. CD CDE 0-3 CON. co co O Cas co t0 N t c a m N s 00 00 in13- N O i i m 0 0 0 'U) ■_ Z a a » n o LL N a r p • 0 • W • co W; Zne O m m M co O WO CO O O (V N O N N 0 0 [O CO 0 N N M0 N N Lo O m Y Y o (I) ca CO o 0n .- Q d a n v x x 0 O ) >U to Q O m rn• rn❑ o 0 ��`` Et O V d U a CO CO co d R Y Y . - - m N N N y J J L ) N U 2 2 0 ' JCC al co 0 0 E U) a a' aa) > U U > Q Q w UJ � w ui J c of 0) h; m a n rl — 0° 13 N o 'c N a m e H y y 7 Cr) 7 C O y -1• J 0 d O C .0 7 0 .0) U tis o .a `a'' c :4 U d L J J I9 L N. a) d 0 a) 2 c K .O al o y c V A L • C C U A LL a ` ' m O a V y w K Z'..3) y E ' N- O N. K > as m m a Cr) 0 0 CO c0i r 2 CO CO o Vh V) V) ,.,.. v g " o 0 0 J I- 2zcnn0 �' CO � � > > > M CO D o o a) o (D O n CO CO t CO CO O o 0CD CD m Q O O lllCC u) N O. n. ND L m a Ci) G c > $ o 0 LL I- W N j N N 72 CO C R W n.; ;; N m m 'c 5 Ce 6 a c d C ii 2 O RZ. .0 C .0 O Z W N) Y y — a7 r. Z W u (O F O • y O D � Z o Q 2 I- 0 0 co Q CO In n `v o F.. CO a N CO 0 03 0 O v S2 N ar I R N C y C o c N N u) 4. 2 N d o n 0 V N f- y 0 CO V Q N h O O O .: .. N f3 a a Y Y CC 3 0 0 0 �.., 0 m o Q < H o (0 m , N c0 -a 00 y N y y Q p N a CO E 2 m ¢ 'O N d d co 0o z C7 ao 2 ❑ c� of c� m O O N m 0 ra U d Q 0 0 d > > V > (>6. Z . .N. N O E a) Y N N 22 • m N W m y ❑ ❑ N t> co m m Q Z Z ? W Z. Z• d d > > > c• c Q Q. d -2 E d s C O • V Nto N E r n r o n y . a/ ap d «0 c as• V OCu ›. N O O. y .. d 6/ N q N 0 c O O rd O N p � dy Ada :: : oy y aCAwd ° dd ° O ai330 a 2 0 2 y iLLaaC Z c R 6f C O d 7 o ¢ ON�.- CO r • • i . _! • o r n O W N •V LO t` O CO CO N N. V CO CO O O CO N CO C0 0 O W V CO O n a) co co ,.�� O O O O r M O M Q) co M OD M 00 o W la N N N M V CD u1 O CO U) CO 0) Mule (di m x a o llama= n n o a N N co m ) coY Y co co O co N CD N. N N� CO 0) CO CO CO V CO 0 CO a a d a O CO V N.- N d O o O ; CO N` V n O) u) 0 0) CO g U O O O O N0 O O o o O o .- N M4 0 CO N Q 17) N U 6) 0) d C 0) 0) ❑0 J 0 e- d Y Y . Y a' a. f0 N -9. O N N c0V N CO 0) 0 CO N (V CO 0) CD J J a N 6) CO V CO n V 0 Cn V N N 0) M N CO (V 0 N o Q Q > Q CO O u) CO r N- N h N� ‘- M V CO N 0 u) V e- D D 0 OO Oi Oi 6 0) ui O) vi (o M vi N: V N- N Ch CO F- F- Y (0 CO O CO CD CO CD u) u) V V CO N N N O O 0 0 E co O1.� O CO CO CD CO CO CO CO CD CD CO (O (D CO CD CD co to j Q Q ? 0= c,x 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 o O E w O6) 0)(D CO6) 0) COO) 0) 6) ) 6) O) 0) 0) 0) 6) 0) 0) 0) N• O co 7 C 0 R 3 u) VN t) N D u 7 ) (f) C ) u) N uN) CD u) N OD LO 1- ici 0 co n V co co O co (O N V V O N N O CO CO N CO CO CO CO CO N. N- N r CO C) 0) N- N. 0) r V M N V 6) N O CO V 0) IN r N (C r N- N- CO 0 co CO N M CO O r V CO (o N M U iiC M M M M OV) 'Cl-) 'Cl-O) O N N O O dN-) r W 00) O 0 .z l6 76 (6 To = 0) 6) 6) 0) ,.6) 6) 6) O) 0) O) 6) O) O) 0) O) O) O W NN CO CO G .co O co OO O (0 .0) O) O)CD CO CO (D CD (0 (O CO CD CO CO c0 n ) 0) O) co 6) 0) 6) 0) 0) 0) 6) 6) T d1 co 2 E 2 2 E N N CD (f) CD co C0 N N co- CD coco Cf) u) If) coCD d 0 0 0 0 0 Z ii2 O> 0> 0> 0 f, -' K C NN > U N C O 7 OO O O CD N r 0 N- r (Cl N N- M 0 0 0 O O2y , < O O O O O h Oi ui � N u) M O M (O o ui N C co U N 6 �O) co C CNNM cV CACnOU m m co C CO CO U) ms Coa U m t IS m 3 m 3 7 7 -‘4.; :_ J 2 z (7) o E c 2 2 2 W O• N a N a u_ a 0 Q3 + 3 + + + O O N n NM'._•iZaD V v O P. r (Clm u (O NV- ML]. V o 0 o ❑ ❑ ❑ O o O . CO V (0 V N r V O N COy TTN (Cl M V v N COa 0 0 O W i Z 7 o o o o ¥ C 0 M CO CC CO N N CO 0) N CO 0 N LE (/) (n (/) U) (n U) N (Cl CO 0 0) V t` 0 0 V 0) CO V N N` CO n N M U) o ri r ri rn v c.i (0 6i Oi (h r; 6i co C(i vi co + + + + N co co 4) V .- co co N N Cn 0) V CO u) 0) AL• CL (UL CUL CUl _ C N M u) u) u) CO W CO Co 0) 6) o C + + + + cn 'E 1- ;- 0 � 0 H 0 0 2 2 2 g ?_ L ft a n r n N ,z N co V N. co co co CO r (Cl co CO m a 6O y 'C}`'x[[2K 0) O) 7 CO CO M 1- OO (V ).- (O a s CO CO O m co r CD N- N O (+i r h U r.: V Oi (O coco O CO0 a V n CD V V CO CO C0 M O) (Cl (Cl N 0) M CO N 0 > O ,- N (0 V CD CO C0 CD N- CO 0) 0) 0) 0 0 0k O V Cr N 7 (o CO N M Ob ❑ ❑ ❑ ❑ g ❑ O N s- CO N- N- N� N. (Cl CO V N N- M CO n N. O N ,- ' M N 0) O N CD N. uu) N CO 0 N (o o0 O N NirnnN- 0) NCOO O O O CO ` NNF „ ) MoMOMMMM() M M M F A. il Ai a 0 _O O _O Z Q E - Ti T S T 2 = _ a NO3 _- O CO O 00 CO CO d.°� OT m m m m m CO Q Q N d 0_ a a 0_ 0_ 0- Y O CO CO CO CO CO CO 010 O O O O O O 0 m M 0) 0) CO 0) N- O 0 0 V CO r n 0) V 0 Q M CO > > > > > > O N CD N- V 0) N- 0) O Cn 'Al N CD h CO CD V I”- _1 "-J O O O O M CD N m CD (O c0 CD co N- W O M Q 0 CO co co CO N 0 N CO CO N CO o Oi N N u) V co co T V O V co i1 • co i' co CO O ,- m O C C CO CO .0 H C s- (Cl N 0 o Cl' E• (O (6 _ _ m m E -0 > 0030 • 2 m O o 0 Z a a > > > (N N a CD N N CO N CD co N (0 0 M N- 0 N u) c0 Z E coo O M N CD I,- N- N N 0) to .- CO 6) CO Cl N- N 0 0 CD U) Q V CO CO co ri ui r M O V f0 Q) co a0 O co M O ,--- ID Cl CO CO CD u) V Cl M 0) N N CO O) V 0) 01 E N N O O N M V u) CO O m CO 0 6) d) O O L:0 2 O 0 — — 0 E CA 4# T .. ii;o .. a lL 3 2r 7 N� + £ O• ` a.Wd 0 N 0 0 01 o 0 N 0 0- Cl)V) CO • • 1 . -1 0 �CI) 01 4.-- N M 0 N CO co) N O) 4) N M �N N- 4- 7 CO N 0) O M m W o 0) r o CO n CO0) rn N o o m v 1.-- 0 n CO 03ao MI MI O O m v M M N M o 6M v m W 00 CO ui o ui o 6 ai a ,- N M 0 aD 0 0 N 7 03 N CO M I` 0 1.-- CO 0 N M N N N M M M M 7 7 7 0 LO CO CO 0 CO r N. N N. `I(' m co 3. O N N > .11 'LI N W 0 (O (Q 0 N O O) M CO 0 M 0) W 7 7 N- M O r N N (O M N) 0 N CO 0 a a s7 (0 al 7 (O O) CD 0) (0 M N- n 0 )0 M 0) 7 CO0) 1() M 7 a0 V tr. N� U N M N .- N .- O O N O O O O O N O O O ,- O N (0 6 0 7 M 7 o 7 3 z E () Lo .41 Q V OI O) y 7 N- L 0 J O D) mmp'' o 0 I ❑ V V . ... m m N a Y Y m cc a' Co rn N N. 7 0 M CO 0 0 M N M M 0 0 h- 7 7 0) CO CO m n OD 0 r J J Z Q C) M N CO 0 CO (0 N 0 N- O N aD a0 M M M N 0 N (0 N Q Q 7 CO 7 0 CO 4- Cb 0) 0 M 4--- 7 0) 7 M N CO 0 7 n 0) N O 0 CO CO CO D D 0 O N 0 O M 6 0 N- M N- N N- Ni N 0 r tb O M CO CO CO (n N CO CA co H H YO) 6) co N- N. N M CD CD N 7 N 0 N- 7 CO CO M 0 Cr) CO r CO 0 7 0 0 0 E (0 c N (0 1n N 0 N (0 M 7 7 7 '(t 7 7 M M M N N N N 4- 4- 4- 4- 4- 4- Q Q 7 = 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E N w a) 6) a) a) a) a) corn rn rn a) co a) 0) C) :rn Co 0) CO O) Q) 6) 0) O 0) CO CO CT- O O ` C 0) 7 0l0 N t0 N (0 (0 N t0 to N N N 0 0 N (0 N N N (0 N N 10 (0 N N H 2 W w I-- N` 7 0) (D a0 CO N 0 O O N. M 0) M n 0 0 CO CO 0 7 O) N M N O CD M CD N CD N- 0 0 O 0 7 N.. CD 0 0) N CO M W M M CO N. 7 7 0) M N 0) O N 7 7 M "N-r:_Q 0) CO N 7 t0 ("N! O CO t0 7 CD (D Gi co N N O CO N O 0 (D 6 N 7 ,- O 6-',. .,6 N- n n aD M N O 7 W ✓ .a 0) ON M M N 00 O MCD CO 0) 'C N (0 CO N 0 N- CO O O N 7 0 C O O O O O O O .- ,- .- .- N N.y .'N M M M 7 7 7 7 7 N N N E' L L N O O O N- N- N. r r N- r o n n N. r r N.CD a) = 0) 0) Of 0) 0) 0) O 0) O7 a1 O 0) co 0) co 0) 0) 6) W W W 0) 0) 0) 0) 6) Q) N 2 ON N N N N N N N N t0 N N N N LLi N 1n 1(i 10 t0 10 10 1(i N (0 .. tri tY O Z d O 4.0 D d C 'p O OO U y O N N M 0 (( O( C() W N M 0 M N� O W 7 r_ 7-1 N it:, COCO M 7 0 N M N Ww E w A D N D 7 n CO O M W M M 0 M O - co (n N O) O 0 0 D M M N wC0N DI- aDa0 °) ON 7 N. QN N O (NO W M 'RM NM 7 N 7 7 4 V 7 N 70 d ((- K mL ( J F- r2 Z (A ❑ W g t o co N- N M 0 0 M 0 N 0 N.. 7 N r C) O a0 O) CD M N- CO CD 0.. (0 N- N N. 0 O a0 N (D CO M 7 N N 0) 0 N N. O O 0 CO CO N (7) 0 CD M N aO 7 N O O N- 0) (D CD N (n 7 7 7 CO O) M CO N O O R. n W O O — 7 r O N N N N- O M CD O N N aD M 7 to N- t` O) N N N N N CO CO M CO 7 N N N N 10 N N ds CO ,,,A `"' c i.L N- N CO 7 N a0 CO 0 C) OD 7 CD N 4- 4- r 0 CO 0 10 aD M W 10 C) C) M (0 N N 4- CD O M O N CO N M OD r M 0) c" 4.- 0 7 M 0) 0 V 0 (V CO (V M co N- 7 .- co co co 7 O V CD V' O to O) r 7 O M Nb 7 N` 0 CD 7 M N CD 0) 7 M N 0 0 N- CD 7 N 0 CO 7 0 N. ) to 0 4- 4- C N at 7 (0 CO (D (D N>: aO 0) 0 0 4- N M 7 7 7 N N 10 K) N la- CI H N r N N N N N N N N N N N N N N- O N- CO M O 10 M 0) 7 C) CO (D N 0 0 CO CO CO O t0 7 CO M 7 N O 0 Co M 05 N 0 CD N N N. "r _NN a, t0 CO 7 N 0) 10 aD O CJ O) co 0 O) CO CO N CO N r N 6 M n N N 6 6 O • N N N M M 7 1M CDh- ON- r r W co O O- co N M et N U) (M0 c0D CO CCO COD _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ^ .-- N N N N N N N N N N N N w ) N 0 O 03 O) O 01 c0 O M O N N N ON) 0 M 100 100 00) CI) M V V 1e(N1 CD Co N (� 0 M O) 0 CD N N N O) CA 0) CD O O (D N 7 co D) O O O N N M L N N N N N N N. N T- ‘i,-.) c N N N c,71 c,71 N N N 45 M M co co co co co co M M M M O co M..: M M M CO CO M CO M M M M E IJ ccs — A Qa_ :130.0MyA m 'N Q N O 0) co_ r (0 0 0) CO N- O 0 7 M 7 7 N- (0 O (0 0) 7 7 CO n 7 CO Q N M 10 M N O 0) O N- 7 O) 7 N CO CD N- CO C) r 7 CO 7 co J N N- CO m 6 O 7 M 7 7 7 M h CD 1() h 6 10 CD O M 7 7 M Q .- .- .- .- N N NNNNN NNNNN NNNNN M M M M M (0 U N VC N m E• N a3 m m L 'LO > co W aa0 o CO` 0 0 0 Za a a > > > N_ c- O N CO CO 0) 0) 7 0) M aD t0 0) h N 1C) CD CO n M CO CO CO Z CO CO 7 0 M N.- I- 0) M 7 O 7 N- 0) N CO 7 0) M 0) CO O) Cl O M V; N 00 O 7 CD 6) 7 W 7 ,- O 7 a0 M n (D O 6 C] M 7 M 6 si C co N N al ^ CD C`O CD N- C U)GO 0 0) O Cb CO N` N` m 0 0) N 0 0) O M N N N M M 7 N 0 n W d) O) O N M 7 CD 0 co N r co co CO Q N N N N N N N N N N N N N V) C. v O c ›.• O 0 c� ao `• m33 ❑ (n C)) P. 0 1110 . y ... O s- LO N O CO C CO O O O O N 6) •• M N N N C CO N U) m N CO O N N O O U) C 0) O Cil CO CO 6? N CO O C C N 7 Cb 1.�� c0 M N CO W O U) O) M N O O M CO N 6) C CD O N C N e- -O C N 4) O N O (D N NM a0 M 0) CO C O U) U) � N N- N- N- CO O) W O O N N M CO C C U) LO CD n I,- OD W 1/411.W0m cn �/ ?• o i �N N O a Lo Mil Y Y 0) N C NU) C N U) W O N O CD N a0 O N M C C C CO O) co a a a d +? U) CD N O O U) •r CO v N O CO N o N •- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o u) 0 Z C () L N Q a, C) m c rn rn 0 O 0 W CO CO m CL Y Y 7 Y cC W W 0) 6 N O) o co co CO U) N CO O) N co o co U) N ID CO U) CO CO N C J J ZC6 N co N N- f0 CO 0 O) M U) C C Cr) U) co N co co U) U) O Q Q 7 a e- O) oa U) co O N e- C CO. N U) N e- Co e- CD O M M O O M e- D n () C 0 O CD U) 6 W C) O O O N O O C 6 N O d) N CO O C+) CO CO F- F Y6i O 0)C N N 7 N M o CO N CO C O CO N' CO U) a0 C0 N M0 CO N O () 0 E o C e- e- e- ,- O O W O) CA O co a0 N N O CO CO CO CO N C CNI- C CO M > Q Q 0 0 0 0 0 of 6i of 0f 0 Cr O) of 6. 6icp.' 6i Oi Oi ai cc of w rn rn cu0". m m co co co co co co co CO co co co ro co co co co co ao co 7 U) U) U7 LO U) CO Cn U) U) U) LO U) U) U) U) U) N U) U) U) CO N U) U) U) > > I w w N CO U) O N CO N N N N 6) N U) CO M O O) C N N N C M _- O C co CO N CO O O CO CO CD N- O N OD O_ N N C U) N 0) co U) CD CO CO CO N CO CO N N N N o co U) CD N C U) N o- 4; y N O OO) O N C'•) M M M N4 N 0) N U) N O) 0 NCO N- CA N U) C) '6 o N U) U) O CO CA M N U) 0) M NN O O C O) M N U) O C C O t co to U) N CO O CO N N CO CO CO 6) 0) O O N N CO CO C C 2 L t V O O O O O O O C7 O O O �3'. O O co t .(fl rn N N n N N N N N N n ti n n y Q) 6) C O) W Co 0) CO O) CO Q) 6) CO 0) W CD 0) 0) O) W CO 0) 6) O) K z Nn vi Ui vi 6- Ui U) Ui N 6 Ui vi U) Ui ui Ui to- ui U) vi U) U) uS vi Ui c v 0 C ii U co Mitts_...>.... v cu c Cco co co co O N N N U O N N UCo N CO O M CO a0 N O Cr,i i V i cCD CD ,171 M Co CO CD N O N N CO N CO N N CO O C N r O CO O w w A CC DrM CM O C) O ) 6 D ) O C O UO UL. N C O O 6 C Uco NOQ) MN rUMMO OMN Oct 00 UaDN O ydTA LO. 0 CC) Cn 9 CD CO CO I- 1� 9 N OD CA 9 O O O N N N M L' w1s e J 6 Z N o W 7 15 O co COM CO O) co CO N O W C N CD N U) N CO OD W O CO 0 N M C1. N C N O O V N N CO U) C CO CO M U) Cr O O CO C CD a) LI i O. O) 0i O N C C C U) C N O M CO CA N C (O 6) N C N O M coCC ON O CMO CCD N. 0- W 000 a0 N OD 00) O O O •e- CO N N M M M C C U) e- e- e- e- e- •,- s- e- e- e- c _ O W o C N N co M CO O U) U) O CD N o N N N U) C O C UI C U) N N N CO CO N O N N N e- CO N CO O U) C N OD Ni CO Oi N I,: C CO N Oi Ci V Ci 6) CO N 00 V 0 CD C o CO N tb r) CO N N CD C N O N- U) N O 00 CO M .- 6) CO C N CO N U) N O N co (O O CD N CO 0) 0) O e- N N M C U) N O N CO ODCO 0) 0 e- N N C COco N N N N N N N N CO' CO' M co. M CO M CO' M M M M M C C C C (L 0 N CO O N co O W N N a0 OO M U) C CO O U) N O N N CO N O C Cr, M .4.. C CO O No.; CO CO N co. -C'"O 'N N M N N O ;I: 1*;': N N 6.1. ) CO N C) C O N N N C O CO N to N o d' O N co N N O C N O N CO N O a0 CO M 6) CO O) N C N O N � CD N- N N CD 0) 0) 0 N CO CO C U) CO CD N- CO CO W 0 N M CO Q F N N N N N N Ni- M M M M M CO- M M M M M M CO- C C C C C 14C U) U) O CO 00 U) CD o0 N- C CO CO CO CO O M N- O CO U) N C Cr) O N e- CO CO CO ' O) co C O Na0 CA N CO r N N O O N r- M 0 6 6N 6 Co vi vi N 0 0 .- 6 6a 6i m of 0 0 0 6i I L N N N N N N N N N N N 3 CO CO M M M M M M M M M M' M C!), M M M M M M M M M M M N — CD N Q Cn N CO_ CO_ N CO N O CO N U) U) N CO _ N a0 U) N_ N_ N_ C C C Q N O C C U) C C C CO O O O O o O CO CO J M M M M U) CO CO N CO O Co CO CO O O O O CO O CD tO O O CO CD Q co M co co co co co co co co co co co co co co co co co co co co co co co co U >. V CD CO C N (13 In CO 0o a 2 L L CO d O 2 CO CO CO o co z d O. > > > CO o 0 .4- U) O N CO N N C co o C C CO co N C N N Oo C Z Om N OW C M O 0) N N N e- O e- O M N N O Co N CO CO O) N 03 Q ("Si N N 0 (V O C O C) CO C) CO N M a0 C) (O O U) a0 C) O C`) N N N - O Q C CO MN N O O O d) O CO CO N O O U) U) C C M 0 CO LL O O e- N M C U) CD N O CO W O e- N CO CC N CO N CO 6) 0 an co co O E N N CO N j N M M M M Ni M co- M M O) CM C C C C C C C C C C, CO C .. V Of CO N. ada a) Z O E •- « m d d � � '1! va• ` CO33 o CO • • . . M CO o 0 n o U CO 0 Co 0 N- 0 CO e- et CO et 0 ro N et 0 O 0 CO M e- U) e( N U) n 0 et CO N a0 (O (O O U) M n N 0 0 eg W ( GO N CO 4 0O M 0) U0 ,_ 7 n O C7 n O) N C') CO N CO O1 0 U) a MI .v_Tw a, n N a0 M CO V 0) et 0 N (O n N n N CO M CO M 0) 0 U) O O O r N N M M et U) N 0 0 n n CO CO O O O O e- .- N Cr) co U N N N N N N N N N N N N N N N N N N N COCOM M M M M m 'W2 N wci Y= N N O a N Y 0) CC CO N- CO Cn et M 0 0) M (DM N n 0 et et 0 0 (O N- 0 U) CO CO 0 0 d 0 U) N et N O 0 N n M 00 n et O N N N M N U) N M <- N 0 N N 0 O O O O O O O O O O O O O O O O O O O O O e- O O O O O 7 Z V 0 co Q N O CO m o 0 J G Co rn 0 ❑ co co a N n (O M N et et CO n 0 0 of 0) U) N n 0 0 et et U) 0 M n et U) U) J J Z7 n CO n U) 0 O n N O) CO N 0) O n N et et N N CO 000 0 et U) N 0 et Q Q = , U) 0 (O M CO 0 U) n C.C. U) 0 M CO 0 0 N- s- e- r C ) 0 . cO O r- N N M V 4 Ui co a) H er W H Ui a) N (c; O M (o 0o O CV CC) cO co H F Y 0N n M CO U) n CO O (O N 0 U) n et O n M O U) N 00 et 0 00 0 E U) En N N N r- .- 0 0 0 O O OO 0 0 n n n 0 (O 0 U) U) 4 et et co co co E y = W co 000 GOO 0p OOO U, U, 000 co 000 000 coo co oo co 000 000 a0O UOO co'0 CO CO COO 003 000 000 — 0 0 0 .0 Q a) N U) 0 U) U) U) N CO 0 U) N U) U) U) N 0 U) U) U) U) U) U) U) U) U) U) U) d 0 0 = W co M et N M n 0 0 CO CO 0 et. n U) 0 U) 0 0 CO n M M et O 0 n N 0 O 0 et CO n et 0 0) 0 M (O M N- U) N n CO CO U) 0 O (O 0) et r` co. O N et 0 0) M CO N et O et n U) N CO 0 CO n N U) M CC n a) O r- NN N N et U) 0 et 06'' H N O N U) 0 O N et 0 co O U -a O 0 N n U) O M n U) Cr, M 00 N (00 U) Co et 0 N n U) O CO aO O o et U) U) CO CO 0 n n CO CO0 O O 0 0 e- e- N N M M et et et U) U) « L ` 00 N (V N N N N N N N N N N N w '' . n n n N n n n n n n n n nx-n n n n n n n n n n n n n n �. °) O O 0) 0 a) a) a) a) 0) a) O a) a) a) 0 a) a) O a) a) a) a) a) a) am a) c Z U) U) U) U) U) U, U) U) U) U) U) U) U) U) U) U) U) U) U) N N U) U) U) U) U) U) _ W O a U ` U W = _ •O = U d O co V co n co et U) N N N 0 0 Cr U) O N N 00 0 et O U) G y ` n 0 0 et et O n ,- 0 N M et N- n et O O <- CO N M et 0) et N et 0 On CO U) et N N O O 0 Ma; U) n M O C O 0 M O 0 N N 0 O w CC U h co O co n U) 0) M n 0 et 0 0 O .,N O N 0 O CO n 0 et CO N U) O N O a) K T N COM COM et t eN U) U) 0 n n n oo 0 0 O O O 0 O N N M 76 CY L N L N N N N N N N N N tf O W Ono r CO0c. 00 0 1.0 M N- 1, COet 0"w0�a '`'° 0) 0 N (0•) n co M 0 03 N 0 CO CO el- 0_ r •� N 0 a0 O N M V U) U) n O (V (D O M ...Corn: 0 O M 0 m C) 0 O Ct 0 O U) O M n U) O M n N 0 _ U, et 0 N n U) O et 0 N n U) 0 0 CO n n CO 0 CO CO C3 0 0 N N CO CO et et U) U) U) 0 CO CL co •-• e- e- e- e- e- e- e- e- e- e- ,- N N N N N N N N N N N N N N N N 03 — Ta C I..L CO U) CO et CO 0 N 0 N 0 N- et n N- O N 0 0 0 M O CO U) et U) CO 0 M et O et N- 0 CO Cl CO CO n M CO CO 0 et N O O 0 0 U) 0 M ✓ Oi Ui H n N cc; et O CO e- n M O U) O (O C`7 cc; et O 0 H n M a) et 0 U) N 0 0 U) CO 0 CO 0 CO 0 0 CO co O 0 et O n et N O n et N N M et C0 N 0 n 0 0 O 0 (�C-N U) 0 n n 0 O 0 0 e- N M co et of V .4- of et 4 of of U) U) U1 U) U) co U) U) U) U) Ui co- U) co co" co (p (p a_ ❑ 0 l 6,1 UM O 0 O 0 O 'O 0 O nN N 0 N0 x T}n ON O nM N O CO 0 et ,`,7, O N N n M O U) O 0 N n et O U) H n M co 40 N 0 M O N n N U) N 0 n U) M O 0 U) M_ 0 0 co M CO 0 7 O 0 et _ O n et N et U) 0 0 n 0 O 0) O N N M et U) U) 0 n 0 CO 0) O N CO et et et et .0 et et et et U) U) U) N U) U) U) „U) N 0 U) N CO co- co" co" 0 0 co 0 0 N U) O 0 et er co 0 co et N- e- O 0 O n N U) CO CO N M T- N. CO O N 0 N N 0 0 U) CO 0) CO (O 0 n CO U) O n 0 O M r 0 et et s Oo n co (O c0 (O (O U) n n N O) O O 0 0 O O a) n W co O) a) O co co co co co co co M M co M M M M M M M M (N+) (N+) co M co M co M M 7, e.. ' f a Cl) 0N M U) et et CO CO M CO 0 n N O 0 U) CO 0 O et 0 et M CO CO 5 co co co co CO 0 (O 0 0 CO n CO CO CO n ao 0 n co n 0 CO 0 0 0 (0 CO Q (O (O CO CO (o (o (O (O (o CO (O (O (O (o co co co (O (o (o (O (o co (o (o O (O ( M M CO M M M M M CO M M M M M CO CO M M M CO M M M M M CO CO RN U > U N m C �. CU al m m C 'O > 0 0 0 O ` m 0 0 0 Z 0 0 > > > U) co et co 0 O 7 N O U) 0 co CO O n U) N M n 0 0 CO N et et el- e-N e- 0 et N CO n 0 0 0 U) et N CO Cr, 0 e- e- 0 e- n O CO et N M Q N 0 U) O et 0 C') n M CO co U) ai U) O et 00 (") n N 0 co O M N N 0 O O CO CO n n CO 03 U) et et et CO N N 0 0 O CO O — N CO et U) U) 0 n CO CO O e- N M et N co n CO CO O N M M et ❑ C U) U) 0 U) 0 U) N U) U) U) U) 0 0 0 0 0 0 0 0 0 0 n n n n n n LaN C . N m y n 0 O Gi m d 3 N 0 0- 0 0 C0 N CO 0 m 10 NA .. M N ! V O 0- CO N- CO M N- CO Co 0) CO N V N- CO 0 CO CO () LO CO O) V O r CO N CO CO V. V CO M N M 0.- N- O N O s M CO CO (Ni O CO V O N V r O M CO N C CO CO CO O CO O41".;to .�Z O co nCO O V O M N CO O V O M CO N CO 0 V CO N CO O CC sr sr (O (p co CO n n 00 CO O CO O O O N N N M M V V N CO m ViV-_ O co y N alZ N N Lo iii Y Y 0) CO N V N M O V CO N 0 V CO M CO 0 0) CO .- 0 N- CO CO 0) N 0 V M 0 0 d CO N (O N O N O O s- O s- N O M CO N s- CO O N� CO V: V O CO V N c Z O - N M O O O O O 6 O O O O O O 6 O O N O N M6 O O CO W N F 7 3 CO CO Q m 3 O O ' d 0) O p ❑ o m on Y Y = Y d' Q' CO (NO O CO O CO CO O CO CO CO N- Cr) O M CO 0 CO O O M CO O CO N CO 0) CO -I -I 2N M 0) N CO V N. M CO CO V CO 0 CO N- CO CO N M M CO Cn CO 0 M < < 3 Q O CO CO s- CO s- CO CO CO CO V s- N- CO V CO CO CO O CO V 0) CO M N CO CO D D 0 ' M N- M N N M M V vi CO CO N- N- CO CO CO N- CO N n Oi N- CO CO F- F- Y N. M O CO co 0 N- V = CO CO N 0) (0,, M O N- V CO CO MCO Nt c7 CO O 0 U E CO O N N s ,- s ,- O O O 0) 0) 0) W - N Cha CO CO N. NCO CO CO CO CO CO if) V • Q Q g ce C c• CO CO CD CO CO co- CO CO CO ri N- ri Nom... Nom; ri r N- N r N. ti r N- N- N- N- r N CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO N 3 CO CO CO CO (O CO CO CO CO CO CO CO CO tO (O Cn CO CO CO CO CO CO CO CO CO CO CO woo 3 C W � > > H � oW N N CO 0) CO 0) CO CO N h 0 CO V u1 M V CO CO 0 CO CO 0 0 0 V ✓ 0) CO 0 N CO CO CO N CO CO CO O 0) V 0 0 M 0 CO CO CO CO N 0) 0 N O CO N- N- N O CO CO CO O N CO N n V CO CO V 0) O LC) M s V QI N CO N O CO s- N O O O M O N O V ':m M N- N CO co r r M O CO '• e- a- u) CO N CO CO CO CO 0) N CO 0) M CO O M N. 0 V C o C co CO n n N- CO CO co O O CO O O O (- e- s- N N N CO CO V V V CO N IL' L L NN N N N N N N N N N M CO :C' M M M C) C') CO COCOCOM M M CO- . wN� NN N. N- r N N N. r N- N- N- N- n N- N- r N h N- n n N. r N- N N 0 c0 0 V O O O O O 0) co O 0) co co co O co O co O O O O O co O O 0 co co C 2 lD vi N N N (O lO CO N (D Ln N (l) 6 (O lD Ln (C) N Ln N (() (O LD N CO U') ce C N O I C y V '.3 O V O C = N CO N CO CO CO CO CO V CO 0 CO CO NCO V 0 N- N` V0) CO N La C V V CO V N O co. CO O O N- co CO CD O _ N- CO O Cn CD CO CO O N Q E ` w C) N N CO N M N O O CO CO N V M M M M Ni O N O U) N N- CO O O w t, d U O I co O M N- 0 M CO CO V N` 0 M« CO O N U) CO CO CO CO V N- 0 CO r O T R M V V V h CO CO N co co CO f� r n co co co O O co O O O O Ta R' ce t C) ,O E N N N N N N N N N N N N C.C3 N N N N N N c;i. N N M Ch M M C? J• r2 2 N ❑ v t O Cf CCOO ON) U) N- N CO N- M V M U) s—' CSO`ef.0' V O (n0 CO ' O M N M CO N D. N M 4 VN N O M n O ON CO OOOU) O C - - IT CO CO O O O O V OTL' O N N N N M M VM COCV O N CN CO V CO- CL > y - N N N N N N N N COM CO- CO CO' CO- COCO' CO. CO- COCO- M CO- CO' M M M CO a ':.t CO � z a (0 C lL V 0 N n CO0) C 0) O CO 0 O O 1- CO 0 N V _0 CO O CO CO 0) M CO 0 CO s- Lo ,- CO N .- V N- CO N. CO N- CO ,- 0 CO N CO 0) 1- 0 O u') M N N_ N- O N (O CO r V r O N CO CO O M h CO CO .- N6 6 CO .. 0) N- CO CO O CO CO VN CO N OO V N 0 O 1` CO VN 0 CO N. h M COM V CO CO N- N. CO O O r N N CO V: (O (O I"- I,- CO O O r N N CO V CO C CO • CO CO CO CO CO CO CO CO r N` N- N- r r r n r ri r N CO CO CO CO CO CO CO Q- 2 0) CO 0 CO V 0 CO N- CO M N O O O aV O COr O O 2.11011-'04-W. N COO N-O O ON O O M M O M NO NU) ,s7., O M O rO O V CN O N un O co CO co CO CO co co O O U) r N V N O CO r CO M N O CO n an M V CO co N- CO CO co O N CO M V N CO N- CO O O 0 .- NU) M V CO CO O e CO CO co- CO CO CO CO n N.: N. h I- N- N- N- I- NS N- N. CO CO CO CO CO CO CO co- g O an co O M 0 0 V N co CO O 0) CO V CO e- O CO N CO N CO N` 0) ✓ O V CO O CO CO CO V CO CO CO CO M O N COCON- coN CO C 0- CO CO O L CO CO CO CO O O 6 O O O O O O O O 0) O OI N6 V COO COI O N PI) N N N N N N N N e�•,. N N N N N N E M M M M M M M M M M M M M -�'C') NS;::zM M M M M M M M M M M M m 'N Q 1 CQ N 0) r CO V N V CO CO n r CO CO N CO N 0) co V O (DCOnCOCO COCO (OCOCO COCOOOO O 4 Iz V NN NM CV CO O COMM CO CO N CO CO CO M MQ MN N NNNN NNNN N NN MM CO U >U) V m C r--- E „E °0 16 m •- < L d d O o 2 m o 0 co z d C > > > V CO 1` O N CO 0) 0) n v M N Cn CO CO N N. 0) CO CO N- CO N Z 1 V C(7 N O O CO O M r N- M V kr1. O O O CO CO CO N CO N V CO r sr.M nn N- CO CD O O M 0Mi M NN N N- n N m V OV CO N N- CO 0 t JD CO CO r CO O O r N CO V CO (O N- CO O O O COr CO Cr; n N (CO O LOCO' V VUS ❑ Er - r N. r O CO Co CO CO CO CO CO CO CO O O co- OOco co- m O O O O O CO 0 c .. to V O C T Cl y .. d it m N p •O w N m 0 j ✓ d y ❑ N • • . O O N N N '- a) N N CO N 7 O �} O h M O m N O r m W 7 4 O N C) co O 7 O 00 O O M O N O M N 2 (O O W N 7 ,.�Z N 7 r (D N M 7 co r M O 7 7 O 7 N fo DO O M O 'p co O) O N CO N r co co N CO O CO CO T N CD CO 7 r O CO r 00 N Ct) CD CO CO CO CO CO r r r r OD CO CO CO 0) C) O O O O .- a- 3 `WWu1 coy 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 CD l() Cn N N N CD m S1 N LV m YY (I) N CO 7 0 0 M U 7 O 0 MM N- CO 0 CD N 0) C) CO 0) 7 M 0) 0) O a Cl Q 4. (D CO CO c- CO CO r r 7 co IN O CO CO '- CO co h. r r CO I"- O C` O co 0 O N N O 7 M O CD o] N- 6 7 M 7 N C) 7 (C 6 'C N6 N O (n Q co co Q y 0 m � J• O 0) 0) Q ©@ a Z...- CO m 2 Y Y z Y Q' W co N co 7 O N 7 r M CO CO N (O N 0 N r C) co 7 (D 0 C) r .- N J J Z CO 7 0 N CO C) 0 N CO 0) N CO CO 00 7 0 r O CO r CO N- CO O Q Q 3 Q O N O C) N CO LO CO M CO CO N C) - CO N 7 (O - N CO CO IN N CO 0 N (n M O r C) 6 7 OD N N OD O W N 6 r aD r r r M N- Co H H Y UO (D M N O O) r (O 7 M 0) r N m r 7 CD (D N ()) O N O D U E U) C 7 7 7 7 7 M M M M M M N N N - - - ;" O O O C) O) C) Q Q 0 - = r I` r N N ri ri h r ri ri r r r 'F N ri N N N- I� ri � co- co- co- , .) O O co 3 C 0 (yE 3 co CO 0 00 CC CC CC CD Cn N 6 6 CC C 00 CO CO 03 CO CO 00 OD CO 6D N N OD 6 CO c6 N N 00 1 Cf) CC N CC N cococ000N H w w O co N CO 0 N CC CD CD CO CD 0 O) 7 0 C) 7 0 CO 0 CD 7 IN 7 CO CO a) 0) CO C) r CO 7 C) N r (C 00 0 CO CO CD N N 7 r C) CO N 7 N (O N CO r O CO N IN CO CO O CO N (D CD N CO IN V) N IN 0) V U 7 03 M (Ci Q) N 0 O W (D N O 6 M co N N r 6 r O co O CA r aD C) O N 7 an IN OD O CO 0 N- co 0 M 7 (D CO N. CO 0) 0 C C C co_ N co CD (D (O CO (D CO (0 r r r r I,- IN- CO CO CO CO CO CO CO CO CO 0) L« L `e M M M M M M M M M M M M +M' M M M M M M M M M M M M M w d 7 °' O 0) 0) m 0 00i 0) CO Or) Cn) CD 0)) OIN IN 0) T 0 OD COff0) 0)00)) 0) 0)) 0) a)i 0)) Off) • X 2 ID N CIO CC (n CO CD CD (D N) (f) N CD lD N CD CC) O N) (D (D N I!) co- co- cD C) o N a; U i0 -AN CU C C 'C C U L 0 CO 7 M N 00 CD CO 0 N. CO CO 0) CD 0 N r CO 0 r CO O 0 0 C O) CO 0 r CD .- W (O (D CO CO CO 0) 0) N N .- CD CO CD 7 CO CD CD O CO 9 ' w` , ()A M N Ci M r O 7 0) Ct) O O O 7 O 7 0) N 7 M M C) M M M o , mCD CO IN r O 0 CO 7 0 IN O) NN,., ) 0O O) LO CO d IX T A - - N N N N N N N et COM M co N r N 7 N- COM N M co 7 7 70 N h LO CO CD CO N L C) .O M M M C') M M M M M M M C M M M M M M M M M M M M M M J 2 2 CC O W — t O Q 7 NI m O M 7 000 CD M COD N N UO O N O lD r O N M U) 7 N 6 r O 7 CD M 6 7 C) 6 C) 0) r M r U) 7 7 C) M r N. CO O CO C 0 NM 7 N r CO 0 N CO M r W 0 N M n O r CO O 0 0 (D IN C` n IN IN CO CO CO CO 00 OD O 0) COC) CD C) 0 0 › CO- CO. CO- CO- COCO M M M Cco- co- M co- Cco- M co- co- M M CCO- C) [T sr- CI- o c MCO IN 7 N CO 0 C) 0 CO O CO r (D O 0 LII CO CO • an r O CO 0) N CO 7 CO O M IN CO 7 CD N CD CO O N CO LO CO O O) r r M O O C) C) N O s} a0 co 6 N C) N N C 7 N co O N co co co 7 co C) co N r Co 0) 0 N N CO M CO N N C) CO CD co co co r r r r co Co 0¢ 5 '' C) m co co co co C) co O rn o) 0, co toto co co- Co co- m co co" ao Oo co- co- co Co co co co co- co- Co co co- co- co- Co co co a O o 1 ii a U 0 N O) N CD CD 7 CD 00O D-,.se`N 7 CC O OD M M O M O) OO 0 N IN 0) h CO O CO O N TO`'M 7 N (O 0 CD O N 7 C) CO D7 N 7 C) 1.6 < 7 CC) O W N O O (O M r O O (O u) M N M O M 0) QO 7O O M N CD W W 0 N N CO M N N 0 CO IN IN N. r co co W co O C) 0) 0) C) C) 0 0 0 0 0 0 0 0 0 0 0 ^ e co- co co- Co CO co- co- co- co- CO co- co- co- OD CO C) co- O C) O) C) O) O) O) O) O) N CO (O LO r N N 7 N IN IN O 0) N N _ 7 CO CO Cal - 0) CO N O M O 4) M M O CD N O CC N 7 M O O) CO CO CD CD L C) r O 6 CO 7 CA 7 U) 7 N U,,,,,,,CO N- 7 N O) I- C) N CO (O 6 CO O M M M M M M M M M M M M- M O O C) 0) C) CO a0 CD ?:1 M N N N O N N N N C)N m co 'Cd Y Q CO CD N `Cr OD 03 CO 0 M M 7 r O CC 0 0) CD N O M M O) J N r CO 0) N 7 (O (O N CD CO CO O C) CO CO 7 7 CD CO OO .- N N M Q 6 6 O M 6 O 6 O C) 6 O 7 C) N r O CD O) C) r O 7 W N N N (� co co M M M M M 7 7 7 CD 66CO Co r r r O Co C) C) m O O O U V ^ r r r E m c C d 73 CO CO t L a 0 0 O 20:1 ° ° D aZ . CO CO r r N N 0) CD r C) 7 r CO 7 0 A 0 W C) (o 0 CO N CO N O CO t-- LO CD O C) Ns- CD 7 CCO U) CO N 0 IN V) 0 0 7 0 h CO M OD CO CO M O7 7N N W CO O N N N r m 0) D M MNhNONO0 Q 7 OO N N aN0 M N M 7 7 r O M O O M D (COi r C- r) Co W W OOOOOOOOO0OOO0OOOOOOOO0 <0 R• u O C >, 0 0 01 a E d — a' 8 0 p N N y = U O. y O Cs) 0 0 . yal •• N O 0 N 0 V 0 r 0 V) r O M V 0 CO N 6r O CO CO CO N V Co CO CO ,- CO V O r O co r N N CO (0 CO W N r CO 0 CO N ,'�� r m O r CO O a O r M (O m r a M N O 0) a0 0 N r 'O 07 N 0 N V N- 0 O M 0 CO CO (O CO 10 N 0) CO CO O N-- M 0 r (p N N M M 7 7 7 an an N N N 0 CO CO r O W 0 0 '- N CO CO V N m `IMO V N U) 0 N U) (() (O (n N N (A N to (p N N N 6 (O (O co" (O (O (0 (0 (0 IMO p yCV CV 0) O > 7. O 41 U) CO (6 N 00 a0 M M V (O 7 0 N 0 CO O C CO N- (O 0) N 00 0) sr CO 00 O N,- a a Q. d .- (0 N N- r N CO N O 00 0 r co N 0) ,- M (0 a CO CO N e- CO N) O O M N ON 40 6 0) 6 (O N6 O N O O O W— M a M O O N N z r r r r It (..) 7 3 Q 0 1.00) 0 d 7 J ea m 0) 0 0 O d m m N Y Y = Y w rt CO n (6 co O N 0) 0 N ) 0) CO CO 0 D) CO0 Sr (O co co (O (O N N J J Z N 0) N (O r r 0) 0 0) CO N CO0 N V CO a0 CO CO N Nr Q Q 7 Q 0 V V N CO M O 0 CO CO O 0 N to M lO CO 0 O r N r CO V CO V D D U ( 7 N- (O r O) N- r 6 7 M N 0) O r (O N N O) N- N N O 00 LN co F- F- YN- 00 0 N 0) 0 CO 0 r a 00 V' N N CO 7 N (O CO r 00 0) 0 0 O 00 E (O 0 co r r N- CO CO (D co N N (O 7 V V co N 0 0) 0 N- N (O N V CO > Q Q 7 • (0 (000 (0 <0 (0 N (o (0 (0 (D (O (0 (o co (0 (o (o U) N N N N () N N E_ q CO COao ao ao OD m ao a0 C0O0 aD m a0 m c0 0o COao COOD Co m m m CO m N 0 O 7 C (6 7 co N (n (O N co to N N h (O (O to 6 N (O (O U) (O (O N N N (n N (O > > l- W 17 (O 0 N M N r 0 N- 0) (O 7 0 M N. 0 N CO CO (O 0 0) N 01 0 (0 0 r 0 CO N- 0) (O OD CO CO 0) N 0) s- N- V (O (0 00 00 N- C N 0 0 0 V CO N- N CO V V N0 O CO CO 00 O) CO 0) N- O N CO 0) V N M CO CV ,- r C)•• 0) O r• 0 (O CJ M V M O Oo V O (D W .r (N co N- V N 0) (0 l 7 V M -a Q) N CD N- r CO 0) 0 0) 0 0 CO CO CO r (17 M 0O ... 0 0 0 0) 0) 0) 0 0 0) 0) 0) 0) 0) 0 _0. 0 0 CO CO CO CO r N- r N. N- EE _ (0 t t ig M M M N N M M co" M M co" co" M ) co" M N M M M M M M M M N y N L+ CO r r r N- N- r r r r r r 0) N. N. 0) r N- r r r r r r 0) r N- .- K E Z.V 0 0 0 0 as 0 0 0 0 0 0 0 0 co rn O O as co m os 0 0 0 0 0 N N N Y') (O N N N (O N V7 N 0) V7 N N N (O N U) (O N N N (O LO- W d O N d LL. K,... b.f. k V C) C 7 co (O 0 N r N CO R 0 0 r N UO 0 N- CO 0 N- 0 M V CO 'O p v 0 co0) M 0) N r 0 V R 0 N N. 0) N (D V N I"- (O CO 0 7 f- r T. C hi wi (0 O N w < 0 N 7 M (MO 00)) N (N 00) s- V N 0 M Or 00) 0) 0303 r ((00 (00 ((1 V M N N V 0 () r CO CO CO 0) 0) 0) O O 0 s- e- 1- .- N M V 4) (0 N- co 0) O .- N CO N CL C4 t >,. ,a a (7 M C M M M M V V i 7 V V 1 V V V V 7 V V N N N (A w UO O 0 0 7 CS W v .. J Z y 0 1 t 0 0 00 0) 00 M 0) OD M 0) N M W r 0 00 0 0 V (O N CO N N 7 0 0- T.. 0 CO (O CO M 0 0 0) co N O r 0) 0) CO CO 0 N N M N d' Q) O0 0 O 0 N V cfi V M O r V O M N O) (O (O N V N 0 N 0) N co N- co 00 0 O O O O O O 0 0 0 N- (O N 0 CO 0 tF N 0 CO (0 (O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0) 0 0 CO CO CO CL N Cl) 7 4. 4V V 4 7 7 7 V• V V V V V V V .0 M M co- M M 0') M M M Z a 1 7 C 0: 0 V 0 CO N N CO CO CO CO M M CO 0 N- (p CO R 0 00 0 00 N-0 (0 r N 0 CO M W (O CO OD O N COO V) O 0 �} O 0 M 0 N CO 0 O CO O) N N a N- M r N r 0 N O o (n O) V 0) M a0 N r 0 r M co N 0 N- CO N (O V CO CO N N N N N N N N co co a 4 to an an N h a co 00 0 00 00 CO CD CO CO CO Co 00 CO CO 11 00 CO OD CO CO CO CO CO CO CO CO IT CI) CO CO CO 00 CO 00 CO CO CO 00 CO 00 Co CO co 00 00 co 00 00 oo00 00 00 CO 00 a O to » (0 0 O (0 4 00 CO 00 0 CO ,:f-4N O M 0 V M N co N 0 r aD 00 M N- 117 DD 7 0 V (O N aD " O (D N 0 (O N- 0 O u) O O N N 0 N O N N 0 00 c0 0 M N- N r (O O N N- u) V 0 N- 00 N V M M N N N N M M V h (O (O (O CO V 0 0 0 0 0) 0 0 0 0 0 0 0 0 0) 0) 0 0 0 0 0 0 0 0 0 0 0 cg 00 O CO co' (0 (0 (0 (0 (6 OD au W W OD 00 OD 0 0 0 co" a0 0 W O W 7.. {: $' O V 00 N h V 0 CD 1- CO NCO N N O (0 CO 0 (0 M N CO CO. CO. .— 0 R CO N r _N 11,... — 0 CO 7 r r' N 0 CO CO W 0 7 O 0 00 0 N- V O r O N( V N 0 (n 6 N- r r CO N r O M N L 0 CO 00 CO CO N.. N- N- CO (0 CO CO CO 0 CO (O N N (O N N N (O (D CO CD 3 N N N N N N N N N N N N N N N N N N N N N N N N N N E .. co 'N Q (n (0 N N- 0 CO OD CO N (O CO (0 OO N 0 M 0/ 0) 0 (O 0 (O 0 s- N N V N 00 0 0 r N) 0 0 ..0 0 0 CO 0 N N M .— .— ,— N .— 0 0 JQ O O O O O O O 00) Or) 0a) 6a) m co0corcorCO CO OOD COOCO CO 003 00) 00)) 00)) 00)) 0 N m C- C E d 10 min r 0 > CO 00 OD O E999 Z a a > > > 0) 0) 0 N 0 Sr 0 M OD N- r (0 CO 0) M CO CO N 00 CO 47 r N 0 r CO a O 0 (D CO 0 CO V M (O (0 r OD CO 0 CO 0 CO e- r 0 OD 0 ' (0 (O V tf) <0 0 DO N M N (O W 00 N (O .1-7- (O (O 0 (00 h a0 N N 0 0 ` .- O CV CV O CD (el m ^ (0 N- O O 0 0 00 0 _ r CO 0 O O N N N M M M M '7 N 0 n CO 0 0 0 r N M L'19 6 0 �' O r r r N 01 CV r h C d 2 7 a r 1.01) a) O p C 0) 0< 0 > 0 0 m m y c� am33o rn ZS0.4 • 0 . y - ... _. u) V 0 (0 CO V) N 0) N CO 0) CO CO u) 0) V u) CO 0 0) N m N. 00 (C7 CO CO O CO CO u) CO cr. (O (O M r N CO V: O V o CO 1.� CO co N- N K) N r O CO CO 4 CO co OO n CO CO M N N N 1C7 (O r O N u) O N 0 1` O N 0 00 O M CD CO cr N O CO CO 0) N N LO u) O O O co 1` R r OD CO CO OD 0) O 0) O O O O e- N- •- N N s W.w a CO CO (o (O co- CO CO N CO (O CO (o CD CO CO CO CO OD t` N- n r r R 1` r Nco m ,gv, -2- 0 N N 00 Q P- -1 0 CO YY u) CU CO V C. V CO N 0) CO N V N V V N V N 0 CO N 0 0 n n CO 0) a s a N. n N CO N- M CO VN CO CO 0 V ,- r N (O V CO O CO CO N V CO N CC U N- O r V O N r Ch O V N N- O - u) c0 O O N (O n 1` M 1` CO O o to j j Z = U 0 LOQ N 0) 0) y r N 0 J o 0)1 0�)\ 0 ❑ o 0 V V M ii- m CO N a Y Y a Y re w n J J N u) O CO N CO V CO 0) 0) 0 C CO CD 0) CO CO CO u) V 1e CO 1` 0 CO V0 CO Nco C,I) O CO CO 0 CO 0) uV COn CO ) O 0) N CO - CO O 0)COQ Q j N CD O O ,- M h O N CO CO s{ V N N I,- O) N ,- O O 0) N M Cr s- V Cr D D 0 ( N O N 0) CO 0) V CO V N OO N- co 4 CO CO O CO -C (O V V N ('1 CO 1- I- Y CO N) N CO u) N 0) CO CO 0 re V 0 N- Cr < CO u) N CO c0 N 0) CO CO O N- 0 0 0 E 0 O N N N N- ,- O O O O 0) 0) 0) m co 'CO R. r n CO co co uN uu) ) ) V > < < g E. co- tri cc; co- vi N ((i co- co- c v v v v v v v v v V v v v v v v - CO CO cl) C 'y COCO0) CO CO CCO CO CO CO CO CO CO CO CO O 0) CO CO CO CO CO CO CO CO CO CO CO CO N N N N N u) c0 u) (O u) (O u) CO c0 CO LO N N N u) N c0 u) u) 0 10 c0 CD 0 O ` C ❑ 1- W w CO N CO V N 0 N 0 V 0) CO V V O n 0 CO CO 0) t` t` CO CO 0 CO 0 V 0) re N 0) u) 0 N CO re CO CO 0) ,(O WCD Cr CO 0) N N N- N 0 CO CO O CO N CO V 0) CO N- u) (0 N. CO CO CO 7 O N Cr CD N CO M O N O) (1) O CO CO CO N- CO 0) (O V N O ;O N CO CO D) �' O N CO .c73() .i 0) N N O O 0) 0) CO CO r r N- r r r r N- h n r r CO CO 0) O 0 0 C n n n N- N. n CO CO CO (O CO CO CO CO CD CO CO CO CO CO CO CO CO CO CO n n E' ' M co- co- co CO CO co- co- co- co- CO co- M...co- co- M co- co- M co- co- co- co- M co- co- M y a) 0 C..RI 0) N. Oa) O^) 0) Q) 0) 0)) 0)) 0)) W 00)) 0) 0) coa)0) co a, 0) O) a> W o) a)N. co N. 00) a) 5 z u) u) N co- (O ui 4) u) CO c0 co- co- u) co- co- CO N N (0 4) c0 4) u) u) co- co- CO N O L. _ U O C 7 0) V CO (0 CO h N s- V N 0) N N . O CO CO 0 u) 0) r ,- N V0 CO a C C) N-N- CO CO CO V CO V 0) O 0) V V re N O CO CO CO CO 0) CO V0 u) 0 O ' i w CO O N CO u) 0 CO O CO N u) O N- 0) O O CO u) N CO 0) W N 0 w , C) U N V N- O CO CO D1 N CO CO N u) CO -,V h O V h O CO CO O N N O N N V 0) Q' T A co co V V u) u) u) co CO co N. n co co co co O) 0) o o O O O ❑ Ce d N "re- N cri ".e- '9- N N In In u) u1 CO (fC) N xN 4) co co- u7 cn cn CO co- co- co- CO J 1- r2 Z N ❑ lY O V h CO N V V 0) CO CO N CO 1z O� CO O c0 O) V CO n V n N- V CO V N N CO 0) O N- CO CO,dam``,..( Low n CO u) N 0) V V O Los- CI. a) M O V 0) c0 CD r v O co; 6 v M (4 V c0 r O u) 0) u) N O N- coCC V V CO COM N NO O O 0 0 0 0 0 O N CO V V CO CO CO CO CO CO CO CO 00 OJ o CO CO CO CO CO CO CO CO CO CO o CO CO CO CO CO Cy� > H.C CO- COM CO- CO- CO- co- co- co- co- co- co- co- co- M co- co- co- co- CO CO co- co- co- co- co- CO C lL ‘- V CO 0 CO CO N. V CO 0 n V Cr CO CO CO 0 0) u) c() CO CO 0 0) N CO N n V Cr V u) CO O CO n u) M N O O) n CO V CO ..- 0 CO n N u) c0 CO O) N (0 N CO O) O N M V c0 CO COR O O) O N N CO V `- V V V V co co u) c0 N CO CO CO CO c0.^ .co, CO CO CO CO CO CO n CR ti r n N- CO Q) CO CO CO CO CO CO CO CO CO CO CO CO-DI?` .^='.. COCOCO CO CO CO CO CO CO CO CO HE CO CO CID CD CO CO CID CO CIO CO CO CO CO CD u..CO.. CO CO CD CO 00000 000 0 N co 0) co CO co N 0) co N 0)'- `n O,.O""O CO CCO r (00 c CO CO ON) CVO Ie, LO O CO CO CO .7 V u) N c- 0) CO (O CO CO V r O CO u) CO r CO co 0) O N CO V V c0 CO n CO 0) 0) O N V V V V N 0 0 0 N c0 u) 0 CO CO CO CO CO CO CO CO CD CD CO CD re n N 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) O) O) 0) 0) 0) 0) m co 0) 0) 0 CO 06 COCO CO co- CO co- CO co- co- co- co- co- co- CO co- CO co- CO CO CO- CO CO CO CO CO CO 4 x V N 1e CO r CO u) r V V CO CO V O CO N CO r re 1- 0 CO N 0) n u) N- 0) u) N- M N CD CO u) N. CO CO O u) M u) CO 0 '7 U) N V N N N CO V CO CO CO O N CO N M c) r C) CO V V .0 CO CD CO CO CO CO CO CO CO CO CO CO O 44N-''''': - N- CO CO N n n N N Co CO CO CO O N N N N N N N N N N N N N -N N N N N N N N N N N N ApE m N Q co co N V V N u) 0) N CO N V CO Y) 0 0 0 CO CO N u) U) 0 N CO J CO s- O CO u) CO c0 V N (0 M V c0 c0 Cr Cr V' Cr cr V V VV Cr V Cr Cr Q CO CO c' V V N- CO CO CO CO CD CO CO CO CO CO CO CO CO CO CO CO co CO CO CO 0) CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO RI O T 0 a m m L V> CO Oa) W o ` m o 0 0 c z a a > > > 0) CO N CO n V0 CO 0 0) u) CO CO CO N 0 CO V r 0 u) N C O 1` n O O) N V CO N O) M V O O V O) co 7 co n CO O CO O V V Cr) CO Q N NN r D) CO CO CO 0) O V u) u) r 0) O) N V u) t` O O N C") CO 0) N c0 CO N u) R. V N- V a) O CO CO O) (0,i CO 0) N cC) CO c0 CO u) CO CO CO n n r CD CO CO 0) O) O) O O O O CO CO CO M M M V N N N CO- CO- N N N N N N N N CO- M M M CO- M CO CD CD M C) co- co- CO ❑ cO ' - r r r r r - - - CO 0 i 0 C T G C y '� = N U d N ❑ c/) '2:3-4 M • • , • fi m111 IIII O M n CD M CO O O CO O 7 M O> CO CO 01 N OD M n M CfM M M C O M U) M O V N O M Ma.�I co V n 0 CO CD 0) O n 0 C CD O N M n co c N CO M CO 7 V 7 V N N N CD M (O <O n n n `ueC co N r n r: n r n r n r r r m i ? 0 a: N N MI Y Y 0) CC c0 cc O M O M V O N O COM O M V M N n0) O N O a s d V n NiCD U ,- R CO 6 n 6M M O O ,- 7 O Cr) O o N u3> Q p)N U 0) 0) ) d o J 0) 0) O 0 o m d a co co 3 Y W W Ca N N M n CD M IN V' 0) CO CD CO CD CO V CO M N J J 0 N N N V' CO 0) 01 N CO N CO N 0) V O co Q Q 3 Q V- 0 CO 00 CD CD N O O N LO 0) CO CO V' 0) CO 0 0) 7 D D 0 O 6) D] n CD N V V V 0) O CD CD r M M V n CO co I- F- Y V O CO V co CO N 0) 0 N O CO CO C) -n V n V o U U E 10 61V V CO CO CO N N N N- .- ,- 0 0 0 6) 0) 0) M co j Q Q 3 E v v v v v v v v v v v v V v v ri co- oi ri a) eo cococoCO co co cococo cooo coao coeo - M co a) c 2 m a M CO co co co M CD 3 a> a> 0 0 LO LO N u) N CO u) 0 Cr) u) )D 0 N U1 U) ZOO ` W > > w I- CO M O N M N O) O O 00 r M D N) M CD O M O M 0) N CO CO W 00) M CO O O) N CO O n N n CO CO n C r N CN O 6 0) M n O N n u) O) C')..::CD 0) N M O C) LO N M V V V N N CD CD CD n N- n CO M CO 0) 0) 0 0 0 0 N- n N. r n n n n N- n n n n r n N- n CO i .0 Z g M M M M M M M M M M M M C> M" M co- co- M co- M a) t 0 N- N- n n n n n n n N- N- n n n n n N- n n n K Z „ co 0 o-, co a) a) o) m 0) 0) o) 0) 0) 0) 0) 0) 0) o) a) o) N co- CO CO Cr) i!I N 6 N N N N N co- N Cr) 6 N co- CO C co O V 'R gat 47:,-,7 O (O c U O i 3 r O M CD N M CO 0 CO O) V 0 0 0 0 n 0) G N n CD N 7 r CO CO )0 N 00 0) CO N CD n )0 CO 0) 0 o m C A coci ' v v CO 0) cc;N ao C) )O) v7 ui N C. C m O ,d 0) U CO CD cl.N N.N 0 M CO 0) N CO 0) N CO CO C C O N. I,- 0 U f0 � .-- N N N CO M M CO V V V CO h M CD CD n n n 2 CC L CC CO CO CO CO CD CD CD CO CD CD CO CO CO CD CD CO CD CD CO CD is �" ?,,,..,,T,,,TJ?=.i O O D r � r � Ca '$�`z O > O O A W 3 3 J F- rL Z N � '- t 0 O OD N O CO 0) n f:', OD M P+t. M CO M OD Q (O (O 7 r M N M D) Ct}^ '°` ' M M CO a) N M ` 0) N 0) M n CD O) N n N 0) M M Cn CC N CO n n CO CD 0) 0) O O O N N N M M V' V CD co co co CO co co co W 0) 0) 0) 0) 0) W 0) 0) 0) 0) 0) >. H co- M M M M co- M co- M M M M M co- M M co- co- M co- CL W 3'`N (I) 4-44 ,. C i.l_ CD V 0) M 0 CO CO CO CD CO 0 r V CD 6) N x- CO V _0 0) OD CO Cr N V 0) V 7 N V n O M O) O 10 N CD n n CID 0) O M M N- CO 6) N V CO n n n n n n 00 CO CO 00 CO CO CO N CO 0) 6) C) 0) O '. 0, CO CO CO CD co co co co CO co co co CO co co co CO CO CO C) c) co CK Co CO co- co- co- co- co- OD CO CO co- OD co-....co CO CO co- CA CO CO N ci N 3• V 0) O V nM N M O M M V O C0 N 0O V 0n D N M R Cn CO CO n co 0) 0) 0) M N CO n 0) O N O 0) N. n n n n n n n n n OD CO co co co co 0) o) 0) 0) 0 0 0) 0) 0) M 0) Cr) 0) 0) 0) 0 0) 0) 0) 0) 0) 0) E CO- CO- CO- CO- COro co" ao co- co" co" co. co- m w Co co- CD co- M M Mco V N 0 N CCMQ) N. N VO) V CO 00 CO CO N C• N- OD CD .. V M O 8 N r n nn n nn n n nn nna r nCO nO Nnn nn 3 NN NNNNN NNNNN , NN NN E Y f5 v # a A 1 a co N 0) Nr CO CD CO 0 O) On V 0) CO CD V CO an 7 V CO V N CD n u7 CO CD CO an V N O N N MMOMoo D MMOCCDCCCCW0Q ODD CDOD OOD OD0ODCDCCDODODOD CO0CO l0 C1o.V '. m C ..- N Ca m m r -0-c co co M O E m O O O w Z O O. > > > CO Cp 0 CO n 0) n N O n N M M V O CO M O OO CO CO CO e- n M CO CO N CD CO CO N CD CO O O Q li fl�� C CID n N N N n n n N CO CO CO CO 0) 0) CD 0) ID V n O V n O M CD O) M CD 0) N N OD 7 n V V CO V v co co M co co co co n n n co co co Cr; O) O O O N o) Q �'^. co- co- co- co- co". co- co- M co- CO- CO- CO- M co- co- M co- M 'Q CO - L 2 V a r. C a o a m a) o E •,,-- :0 m m CD 3 IFN4a'► 0a` 'rn � 30 M Z..\-1 0 • OD y • ro W a IV ig31 s W01; i N N o 0 azN N m Y Y CO ° d a a a U 0 N rn Z U 7 7 Q U) 0) rn n n 0 0) CD 0 m m a Y Y 7 Y ct a 115 m ' J J Q < < 7 D > 0 ' CO 600 Eu, j 7 w - co co N 2 Too Ego H 2 W N u. 0) 0 klb L. ftitkp, 4.1 CU m t m m * o o I.0 o N Ce lf) L10 N L0 C d N r N 0 y N w m N 0 c ci 'a' 2 O E c :«tt :- v U c2i : = co c o d ` d U m (0 U m L d a R• > R' Lo O o Li-, x:amu: o- F 0 Z 7 D CCOO o vo) co m of N. v of .r01. E v 0 A Cp h U 3 L. Q mre co n. CC CYa cn >- To o 4 c O T LL t c m m O -o N m E I-5,, m m o 2 a. U a 4) 0 0) E o co Z _ rh W N 3 y + co C (0 ? p Z O rn o Q U To co :; 0 ' � W C vi 0 - _9 ) m } 4,. l co O u) u) a co u) N V .$ m _ CA I0 C` N u) N CO a v p_'f..—., n CO IA N `� t' C) N CO-'COO CA- CD 0) CR.1 L coM J '' N 3 O N 0 CO N U N L O r A n o o n E C) N 7 ' r' CO N CO •0 0 M m N S N O C N ` t _ CA L• 'O > CO CO CO 0) `� 7 �' O 2 (0999 a a m a O Z a a > > > C a) 0) ^ o 2 Q ^ 2 C C n O C co C 5 d Q n 0 A V am O a y c E .o _ Nw vY33vaino C wo o N M r • • 1 41 CT) • i v rte, r- r M r ~ T p v 0 lfl m a v p ` Q wrw v p `- h Up R ) N CO c70 ro � T m CV 0 11! • Z. r r 4.4N r N U N 48 > •• QY U C. C +-' LO (0 ate-+ ,` 4 i5 s ¢ -J in -c u E Q CU 0 a m < L O O v) C V) O O) N OD O O 00 R7 u v G VI Z ¢. co 4-- N N N CO 0 73 03 O +' Z < s a N ` O C ,0,.!.¢ F- 7 v OHroN + 73 v, ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ tQ pL w 0 T•"' a.WW W W W W W W W W N v L>_ CO 0 F- LL LL LL LL LL LL LL LL LL 4 v v a > O QJ O ¢ J J J J J J J J J C +-' 1-(NI ro Z Z Z Z Z Z Z Z Z vU Ca s v 0 v LL LL LL LL LL LL LL LL LL Ct -0 c > E ((C > CO O 0 Ui a o @ L v �C U R7 V' M N > eG H F- >a) a Q v fl n C Q • Lr O O LL' Z LL LL > h N b Nn O m2rezmLL E to a m \ z = a s E ° ° o ` WcoU n W w fA u ro '7' > 0J' Cl.) W U o 0 • x • iv 44i0 t0 W o' >, ` ` , RSMts if.- EE EE ��IIrrJJ���� LW' R ¢ ¢ ¢ ¢ ¢ ¢ >-}m m m m m m ~ Y Z Z7 _O® 2 = 22xzSE <0000000 v 7 7 7 7 7 7 Z Z H ti a a a a a a 0 C Q. N U cc UJ x T) 0 CO CrTr r LU oo �R 0 0 O O M p p — Q V O O O ,...9 O O O C Y N O o 0 0 0 o o E 0I o 0 0 0 0 0 0 0 v Q 0 W U ❑ N ❑ Q N N O A v W Q w ❑ ❑ ❑ Ne p O ❑ ❑ ❑ ❑ ra N O. m p CC 1 0 r L.) M 0 0 0 0 0 N }' C O O O O O O O O O c r N O O N M tt CC I. C) t0 f0 N �O O o0 t0 !O ate+ > [T) MS S C7 00 h 7f U) M M M f0 C N N N N N N N N N N C m V C O) T O) 6 O) O rn O) O) C O N N N N N N N N N (p N 0 0 0 0 0 0 0 0 0 c O 0 0 0 0 0 0 0 0 + " v L v) U) U) U) U) N N U) In 11 - CO o r, tun prl C 01 y W E d 04 O 0 w Z ...Z Oo < N N co03 N r N a 70 N E 4! cc • =i. a co 1V > a Y co w u J Z 0 u U i ¢ W.. Z C _ in a '� .0 r1 V n s C CO u O CM a0a � E= as ° m STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIA?N WEL OMPLETION OR RECOMPLETION REPO��AND LOG la. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 0 lb.Well Class: 20AAC 25.105 20AAC 25.110 Development 0Exploratory 0 • GINJ 0 WINJ 0 WAG.0 WDSPL 0 No.of Completions: One Service 0 Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 3/20/2017 0 216-113' 3. Address: 7. Date Spudded: 15. API Number: P.O.Box 196612 Anchorage,AK 99519-6612 2/8/2017 50-029-23568-00-00' 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 3/14/2017 • PBU V-08 - Surface: 4689'FSL,1634'FEL,Sec.11,T11N,R11E,UM 9 Ref Elevations KB 97 95 ' 17. Field/Pool(s): Top of Productive Interval: 3191'FSL,4897'FEL,Sec.02,T11N,R11E,UM GL 51.2- BF 53.37_ PRUDHOE BAY,PRUDHOE OIL ' Total Depth: 3383'FSL,2538'FEL,Sec.03,T11N,R11E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: • 13357'/8966' ' ADL 028240& 028241 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 590669- y- 5969937- Zone - ASP 4 '13457'/8962'• 00-001 TPI: x- 587357 y- 5973681 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 584434 y- 5973839 Zone - ASP 4 None 1805'/1751' 5. Directional or Inclination Survey: Yes 0.(attached) No 0 13. Water Depth,if Offshore: 21. Re-drill/Lateral Top Window MD/ND: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) N/A 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD/GR/RES,MWD/GR/RES,MWD/GR/RES/DEN/NEU,Cement Evaluation 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH ND HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 129# x-56 48' 183' 48' 183' 24"/Driven 8 cu yds Concrete 9-5/8" 40# L-80 47' 2897' 47' 2727' 12-1/4" 1470 sx LiteCrete,231 sx Class'G' 7" 26# L-50 45' 10141' 45' 8720' 8-3/4" 356 sx LiteCrete,88 sx Class'G',109 sx LiteCrete 4-1/2" 12.6# 13Cr85 9664' 13449' 8308' 8962' 6-1/8" 337 sx BiModal • 24. Open to production or injection? Yes 0 No 0 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#13Cr85 9971' 9849'/8468' 2-3/4"Gun Diameter,6 spf 11778'-12120' 8936'-8952' - 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 12623'-12655' 8969'-8971' R 12700'-13286' 8972'-8968' HECEIVED Was hydraulic fracturing used during completion? Yes 0 No 0 13316'-13357' 8967'-8966' Per 20 AAC 25.283(i)(2)attach electronic and printed n�� 81 �} information � C H' MPI._ i 101v1 201/] DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 3/1,e7 In ASC" t...z 2500' Freeze Protect w/78 Bbls Diesel fERIFIED �c Lv 27. PRODUCTION TEST Date First Production: March 26,2017 Method of Operation(Flowing,gas lift,etc.):Gas Lift Date of Test: 3/28/2017 Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: 12 Test Period *"."► 438 450 203 176 1027 Flow Tubing 360 Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(con-1: Press 1160 24 Hour Rate '""40' 876 900 406 . 31.2 Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only VTI 6/�/17 � /���7 RBDMS O,. APR 1 9 2017 .,4:. ,(5'47 cl 28. CORE DATA Conventional Core(sl Yes 0 No ® • Sidewall Cores Yes 0 No El If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top 51' 51' Well Tested? Yes 0 No I1 Permafrost-Base 1856' 1802' If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 10370' ggp2 separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Ugnu 3160' 2943' Colville Mudstone 5772' 5045' HRZ 7309' 6278' Kalubik 7550' 6471' LCU 7857' 6723' Miluveach 8083' 6920' Kingak 8823' 7568' Sag River 10138' 8717' Shublik 10175' 8749' Eileen 10334' 8876' SADLEROCHIT-ZONE 4 10370' 8902' Eileen(Invert) 13428' 8963' Formation at total depth: Eileen(From Base) 13428' 8963' 31. List of Attachments: LOT/FIT Summary,Summary of Daily Drilling Reports,Survey,Cement Report,Property Plat,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sperry,Nathan Email: Nathan.Sperry@bp.com Printed Name: Joe Lastu Title: Drilling Technologist Signature: hone: +1 907 564 4091 Date: 4-/I INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only TIS= 4-1/16"GW VVELLFEAD= FMC • V-08 NOTES: W IIIDOGLEG:16.8°@ GL1413'*** 10568'. ACTUATOR= OKB.REV= 97.95' ****4-1/2"CHROME TBG&LNR*** BF.ELEV= 53.37' N I KOP= 300 !► ' ■ 2024' —14 112"FSS X tom,D=3.813' Max Angle= 103"@ 11116' Datum MD= 10364' 7► Datum TVD= 8800'SS N N 20'X 30'CON[XJCTOR 129#,X-56, —120' * GAS LFT MANDRELS D=18.770' ST MD ND DEV TYPE VLV LATCH FORT DATE 9 3252 3017 36 KBG-2 DOME BK 16 03/24/17 I9 518'CSG,40#,L-80 HYD 563,ID=8.835" H 2897' 8 5113 4517 37 KBG-2 DMY BK 0 03/19/17 "'777 7 5934 5176 37 KBG-2 SO BK 20 03/24/17 ESSTIvMTED TOP OF CEMENT(03/17/17) H --3030'AIii.1%iii 6 6340 5501 37 KBG-2 DMY BK 0 03/19/17 14.11 5 6747 5826 37 KBG-2 DMY BK 0 03/19/17 7'BTC FT H MDL754 STAGE TOOL,D=6.19' —1 4832' 4 7362 6320 37 KBG-2 DMY BK 0 03/19/17 W 4404/ 3 '7934 r6789 30 KBG-2 DMY BK 0 03/19/17 7',26#,L-80 VAM TOP HC WFT ACP,D=6.25' I 4859' \J I,- 2x8756 x7509 29 KBG-2 DMY BK 0 03119!17 0.:11 1 x9621 '8270 27 KBG-2 DMY BK 0 03/19/17 ESTIMATED TOP OF CEMENT(03/17/17) —I —6660' 4 V ' I 9820' —14-1/2-t-ES X NP.D=3.813" 104 Minimum ID = 3.725" a@ 9953' y te kit 4-1/2" HES XN NIPPLE blibroe: _E4 9i 9849' —17*X 4-1/2"HES TNT PKR,D=3.865' b ' , 9883' —14-1/2.HES X NP,D=3.813" 4 Is Ili 44(616‘ 1104 V I I 9963' —{4-1/2"FES XN M',D=3.725' TOP OF 4-1/2'LNR H 9964' V ►► k� 9964' H r X 5"H521 WFT VVTSP4R3 LIP&H521 it* tie; WFIVVR-RANPHS HGR w NWT TIEBACK 4-1/2'TBG,12.6#,13CR-85 VAM TOP, — 9971' rA�4 ►t SLEEVE D=4.310" .0152 bpf,U=3.958' I' 0r 0 9971' H4-1/2"WLEG,D=3.958' V 1.11 9986' —{5"X 4-1/2'XO,D=3.890" k Ai h► 7'CSG,26#,L-80 VAM TOP HC,13=6.276" — 10141' 4-1/2'TOC —{ -10660' PERFORAN SUMMARY I TISUMMARYMI I. REF LOG:MIND-GR LOG ON 03/14/17 i 4° Iry ANGLE AT TOP PERF:87"@ 11778' Note:Refer to Production DB for historical perf data USIZE SPF INTERVAL Opn/Sqz SHOT SO2 I 2-3/4" 6 11778-12120 0 03/18/17 I 2-3/4" 6 12623-12655 0 03/18/17 I I 2-3/4" 6 12700-13286 0 03/18/17 I 2-3/4' 6 13316-13357 0 03/18/17 I sd I P03TD —I 13367' t 4-1/2'LNR,12.6#,13CR-85 VA IA HTTC, H 13449' .0152 bpf,0=3.958' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/20/17 P-272 NBN WELL WELL: V-08 03/27/17 JMD DRLG HO CORRECTIONS PffiMT No:'2161130 03/28/17 LG/JMD GLV C/O(03/24/17) API No: 50-029-23568-00 04/17/17 JNUJMD EDITS TO COND&LNR INFO SEC 11,T11 N R11 E 4689'FSL&1634'FEL 04/17/17 NS/JMD FINAL ODEAPPROVAL 04/17/17 NS/JMD CORRECTLCliff DEPTH BP Exploration(Alaska) GR0 • 1500'00" I o N PLANT Z - s .� 0 _-N e : 9� �2 1 7 I e011 12 9,V PAD "'�- o V-2201 • !' IHB PROJECT 'o V-207 • • V-2241 I , V-227i ■ ■ V-2191 9 V-120 ■ • V-115 't tib V-03 ■ • V-2131 0 po 0 V-218i ■ IIV-100 Q O p V-111 • ■ V-122i ° V-103V-2161 • ■ V-117 a V-212 • ■ V-121 V-106 ■ ■ V-211 V-1231 ■ ■ V-205 V-04 ■ V-08 V-105i ■ • V-01 V-221i • • V-223i V-07 • V • V- 2l• • • V-229 VICINITY MAP V-201 ■ N.T.S. V-107 • ■ SLOT S-J V-02 ■ • V-215i V-104i • • V-204 V-210i ■ IN V-114 LEGEND: V-202 ■ IN V-119 V-2141 ■ ■ V-109 V-101 ■ ■ V-225i + AS-BUILT CONDUCTOR V-211i • IN V-113 ■ EXISTING CONDUCTOR V-108 • ■ V-05 V-203 ■ IN V-112 ‘‘‘lan" I'l N. *a°49� /\ a* V PADvir .10 _ % Timothy F. Barnhart: ��110200 ��� tit/---tssiorg- GRAPHIC SCALE %IMO -- 0 75 150 300 / ( IN FEET ) SURVEYOR'S CERTIFICATE NOTES: 1 inch = 150 ft. I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN 1. ALASKA STATE PLANE COORDINATES ARE NAD27, ALASKA ZONE 4. THE STATE OF ALASKA AND THAT GEODETIC COORDINATES ARE NAD27. THIS AS-BUILT REPRESENTS A SURVEY 2. HORIZONTAL AND VERTICAL CONTROL ARE BASED ON V PAD MADE BY ME OR UNDER MY DIRECT OPERATOR MONUMENTS. SUPERVISION AND THAT ALL 3. ELEVATIONS ARE BP EXPLORATION MEAN SEA LEVEL DATUM. DIMENSIONS AND OTHER DETAILS ARE 4. MEAN PAD SCALE FACTOR IS: 0.999909334. CORRECT AS OF DECEMBER 29, 2016 5. DATE OF SURVEY: DECEMBER 29, 2016 & MARCH 4, 2017. 6. REFERENCE FIELD BOOK: NS16-59, PGS. 23-33 & NS17-13, 24. LOCATED WITHIN PROTRACTED SECTION 11, T. 11 N., R. 11 E., UMI AT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION BASE FLANGE NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS ELEV. V-08 Y=5,969,937.70 N=10,000.38 70'19'39.366" 70.3276017' 51 2 4689' FSL 53.37 X= 590,668.99 E= 4880.00 14915'52.849" 149.2646803' 1634' FEL DRAWN: KLEIN bell CHECKED: ØbpJACO85 DATE: DRAW72/30/N16 : SCALE: FR816 WOV 01 JOB NO: WOA — V PAD AS—BUILT CONDUCTOR LOCATION SHEET: 00 12/30/16 ISSUED FOR INFORNA110N DK JJ 1"=150• WELL V-08 1 OF 1 NO. DATE REVISION BY CHK • • BP AMERICA y LOT/ FIT Summary ,, Well Name: V-08 Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 02/13/17 LOT 2,926.00 2,752.00 9.20 900.00 2,203.30 15.55 02/27/17 FIT 10,165.00 8,740.00 8.60 634.00 4,538.60 10.00 Page 1 of 1 • • North America-ALASKA-BP Page 1 of 76 Operation Summary Report Common Well Name:V-08 I AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/6/2017 00:00 - 04:00 4.00 RIGD P PRE BEGIN EVENT AT 00:01 ON 2/6/17 WITH PARKER RIG 272 RIG DOWN OPERATIONS ON L-200: -PREP MODULES FOR SEPARATION -BREAK MODULES AND STAGE FOR MOBILIZATION MOVE UTILITY MODULE AND STAGE ON FAR END OF PAD. -PU SURFACE DIVERTER SYSTEM 04:00 - 07:30 3.50 MOB P PRE MOBILIZE RIG MODULES FROM L-PAD TO V-PAD I-HOIST AND PIN 25'SECTION OF THE DIVERTER,HOIST SECTION OF THE 21-1/4" HIGH PRESSURE RISER INTO THE BOP DECK. 07:30 - 10:00 2.50 MOB P PRE SPOT DRILL MODULE,MUD MODULE AND i UTILITY MODULE OVER V-08 AND SHIM TO LEVEL. 10:00 - 13:30 3.50 RIGU P PRE GENERAL RIG UP -RIG UP PIPE SHED -INSTALL HARD LINES BETWEEN MODULES. CONNECT STEAM LINES. -CONNECT ALL INTERCONNECTS BETWEEN MODULES. -PRE SPUD MEETING WITH CREW ON TOUR. I-PERFORM PRE-RAISE DERRICK CHECKLIST. 13:30 - 14:00 0.50 RIGU P PRE RAISE DERRICK -PERFORM CHECKLIST AND PJSM -523 KLBS PU WEIGHT OFF STAND 14:00 - 18:00 2.00 RIGU P PRE RIG UP RIG FLOOR -SKID FLOOR AND SLIDE CATTLE CHUTE INTO POSITION -SET MAN RIDERS IN PLACE -INSTALL MOUSE HOLES -CLEAN AND CLEAR FLOOR SIMOPS: 1-INSTALL CUTTINGS BOX -COMPLETE INTERCONNECT WORK 16:00 18:00 2.00 RIGU P PRE BRIDLE DOWN -HANG BACK BRIDLE LINES&SECURE -RIG UP TOP DRIVE AND BLOCKS -FUNCTION TEST RIG ESD -QUADCO TECH CALIBRATE PVT SENSORS. WITH WATER. -TAKE ON 8.7PPG MAXI-DRILL SPUD MUD. Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 2 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 BOPSUR P PRE NU SURFACE DIVERTER SYSTEM PER THE AOGCC APPROVED PLAN -INSTALL RISERS,KNIFE VALVE,AND ANNULAR. -RIG UP AND CONNECT TWO 4'PIECES OF DIVERTER LINE TO 22°SPOOL PIECE. SIM OPS:BUILT 23 STANDS OF 4"DP OFFLINE. RtG ACCEPTED AT 18:00 2/7/2017 00:00 - 04:00 4.00 RIGU P PRE GENERAL RIG UP OPERATIONS -CONTINUE SURFACE DIVERT SYSTEM RIG UP AND ADJUSTMENTS -PIPE MANAGEMENT:MAKE UP 4"DP&5" HWDP STANDS WITH OFFLINE STAND BUILDER -TAKE ON REMAINDER OF 8.7 PPG SPUD MUD 04:00 - 06:00 2.00 RIGU P PRE RIG UP SURFACE DIVERTER SYSTEM. -INSTALL TURN BUCKLES,INSTALL BELL NIPPLE -INSTALL ACCUMULATOR HOSES TO SURFACE ANNULAR AND KNIFE VALVE, INSTALL HOLE FILL LINES 06:00 - 07:00 1.00 BOPSUR P PRE PERFORM PRE-FUNCTION TEST ON DIVERTER SYSTEM 07:00 - 08:30 1.50 RIGU P PRE GENERAL SPUD PREPARATION -PERFORM RIG EVACUATION DRILL AND AAR -(D3)DIVERTER DRILL AND AAR WITH FISCHER'S CREW -HOLD PRE-SPUD MEETING WITH CREW 08:30 - 11:00 2.50 BOPSUR P_ PRE FUNCTION TEST DIVERTER ANNULAR AND KNIFE VALVE -KNIFE VALVE OPENED IN 23 SECONDS -DIVERTER ANNULAR CLOSED IN 32 SECONDS -PERFORM DRAWDOWN TEST ON ACCUMULATOR -TEST WITNESSED BY AOGCC REP BOB NOBLE -FAIL PASS ON ANNULAR DUE TO LEAKING HYD FITTING. 11:00 - 12:30 1.50 BOPSUR P PRE LOAD AND STRAP TOOLS IN THE SHED -ORGANIZE PIPE SHED FOR DRILLING OPERATIONS 12:30 - 13:30 1.00 BOPSUR P PRE CONDUCT PRE-SPUD AND D3 DRILL WITH YEAROUTS CREW -PERFORM RIG EVACUATION DRILL AND AAR _ 13:30 - 14:00 0.50 BOPSUR P PRE RIG SERVICE -SERVICE TOP DRIVE -TAKE MEASEUREMENTS FOR WELDER PROJECT FOR MOUSE HOLE -UNABLE TO INSTALL MOUSEHOLE DUE TO NEW LIFTING RING ON ANNULAR. 14:00 - 15:00 1.00 BOPSUR P PRE GENERAL PREPARATION FOR SPUD -BLOCK CALIBRATION WITH BAKER PER THE MWD Printed 4/3/2017 9:51:51AM `AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 3 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:00 - 16:00 1.00 DRILL P SURF MAKE UP BOT 12-1/4"DRILLING BHA FROM SURFACE TO HARD TAG AT 64' -NEW 12-1/4"HUGHES VMD-3 MILL TOOTH TRICONE BIT,BIT SUB AND STABILIZER TO DRILL COLLAR -LAY DOWN DRILL COLLAR AND PICK UP STAND OF 4"DP 16:00 - 17:30 1.50 BOPSUR P SURF "FILL ALL LINES AND CONDUCTOR,INSPECT FOR LEAKS AND PRESSURE TEST SURFACE LINES. -PRESSURE TEST SURFACE LINES TO 4000 PSI;GOOD TEST -CHANGE OUT ALL UPPER AIR BOOTS ON THE FLOW BOX 17:30 - 18:30 1.00 BOPSUR N WAIT 63.80 SURF WAIT ON RISK ASSESSMENT FOR SURFACE DIVERTER LAYOUT. • 18:30 - 20:30 2.00 DRILL P SURF CLEAN OUT CONDUCTOR FROM 64'MD TO 145'MD WITH 12-1/4"BASIC DRILLING BHA -WORK PIPE SEVERAL TIMES TO ENSURE I FULL CLEAN OUT AND NO FILL ISSUES -400-450 GPM,200-250 PSI PSI,100 RPM, 1KFT-LBS TORQUE PU 42K,SO 38K,ROT 41K MUD WEIGHT IN/OUT:8.7 PPG 20:30 - 21:30 1.00 DRILL P SURF PULL OUT OF HOLE WITH BASIC 12-1/4" DRILLING ASSEMBLY FROM 145'MD TO SURFACE AND LAY DOWN BHA PER BAKER DD -RACK BACK(1)STAND OF 4"DP -BREAK OFF BIT,LAY DOWN BIT SUB AND STABLIZER,LAY DOWN(1)DRILL COLLAR 21:30 - 22:00 0.50 DRILL P SURF CLEAN AND CLEAR RIG FLOOR 22:00 - 00:00 2.00 DRILL P SURF MAKE UP BHA#2 FROM SURFACE TO 130'MD PER BAKER DD -NEW 12-1/4"HUGHES VMD-3 MILLTOOTH !TRICONE BIT(SAME BIT AS CLEAN OUT BHA) -BAKER 8"MOTOR 1.5°AKO WITH NON-PORTED FLOAT i-DIRECTIONAUGRNSS/GYRO WHILE DRILLING(GWD) -GYRO DATA REP FUNCTION TESTING 2/8/2017 00:00 - 01:00 1.00 DRILL P SURF CONTINUE MAKING UP REMAINDER OF THE BHA TO THE FLEX COLLAR AT-130'MD -PU ONE STAND OF 4"DP AND RUN IN HOLE TO 145' -TAKE INITIAL GYRO SURVEY IN CONDUCTOR 87'SURVERY DEPTH:GOOD SURVEY 01:00 - 02:00 1.00 i DRILL P SURF RUN IN HOLE WITH 12-1/4"DRILLING ASSEMBLY FROM BHAAT 130'MD TO BASE OF CONDUCTOR AT 192'MD -NO SIGNS OF FILL OR ICE IN CONDUCTOR -TAG UP SOLID AT 192'MD,7'BELOW BASE OF CONDUCTOR -CIRCULATE CONDUCTOR CLEAN PRIOR TO DRILLING NEW FORMATION -400-450 GPM,525 PSI Printed 4/3/2017 9:51:51AM `AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 4 of 78 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 04:00 2.00 DRILL P SURF SPUD V-08 AT 02:00 ON 02/08/17 DIRECTIONAL DRILL 12-1/4"SURFACE HOLE FROM BASE OF 20"CONDUCTOR AT 185'MD TO 228'MD -100-200 FPH INSTANTANEOUS ROP -350-450 GPM,420-650 PSI ON BOTTOM,400 !PSI OFF BOTTOM,40 RPM,117 BIT RPM,1 KFT-LBS TORQUE ON BOTTOM,1 KFT-LBS ' OFF BOTTOM,1-6 KLBS WOB '-LOSSES:50 TO 100%LOSSES OBSERVED IN ZONE DIRECTLY BELOW CONDUCTOR. TOTAL LOSSES=157 BBLS. -RIG CREW CHECKING ALL THE WELLHOUSES ON V-PAD FOR SURFACE BROACHING.NONE OBSERVED. -WIPED STAND WITH KELLY DOWN,LOSSES STOPPED WITH DRILLSTRING OFF BOTTOM. i -PULL FIRST STAND WITH FULL PUMP RATE: 350 GPM,420 PSI j '-PULLED UP INTO THE CONDUCTOR AND CIRCULATED CONDUCTOR CLEAN DUE TO HEAVY RETURNS PACKING OFF THE FLOW I LINE. -400-450 GPM,550 PSI,40 RPM,1 KFT-LBS TQ ' -RIH WITH PUMPS OFF AND TAGGED 7'OF FILL,WASHED TO BOTTOM AND CIRCULATED BOTTOMS UP U NTI LL CLEAN. -400-450 GPM,550 PSI,40 RPM,1 KFT-LBS TQ -POOH TO PICK UP FLEX COLLAR STAND, RIH TO BOTTOM OBSERVE 4'OF FILL ON BOTTOM. , -TAKE GWD GYRO SURVEY,SURVEY DEPTH 161'MD MUD WEIGHT IN/OUT=8.7 PPG 04:00 - 04:30 0.50 DRILL P SURF RACK BACK 4"DP STAND i -PU 3 JOINTS OF 8"FLEX COLLARS ' PU=63 KLBS,SO=61 KLBS ,04:30 - 12:00 7.50 DRILL P SURF DIRECTIONAL DRILL 12-1/4"SURFACE HOLE !FROM 228'MD TO 699'MD(471'IN 7.5 HRS= 62.8 FPH WITH CONNECTIONS). -100-150 FPH INSTANTANEOUS ROP SLIDING, 150 FPH INSTANTANEOUS ROP ROTATING -500 GPM,1010 PSI ON BOTTOM,900 PSI OFF BOTTOM,50 RPM WHEN ROTATING,160 BIT , RPM,5-6 KFT-LBS TORQUE ON BOTTOM,2-3 KFT-LBS TORQUE OFF BOTTOM,25-30 KLBS WOB , -WIPE 30'WITH PUMPS ON AFTER DRILLING STAND DOWN,RUN BACK DOWN ON ELEVATORS WITH PUMPS OFF -CYCLE PUMPS AFTER WIPE TO INTITATE GYRO SURVEY -MINIMAL LOSSES TO FORMATION WHILE DRILLING AHEAD=SEEPAGE -MW IN/OUT=8.8 PPG -MWD SURVEYS CLEANED UP AT 234',(STILL USING GWD SURVEYS PER THE SERVEY PROGRAM) Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 5 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 16:00 4.00 DRILL P SURF DIRECTIONAL DRILL 12-1/4"SURFACE HOLE FROM 699'MD TO 1024'MD (325'IN 3.0 HRS= 81.25 FPH WITH CONNECTIONS). -100-150 FPH INSTANTANEOUS ROP SLIDING, 150 FPH INSTANTANEOUS ROP ROTATING -550 GPM,1230 PSI ON BOTTOM,1100 PSI OFF BOTTOM,50 RPM,3K TQ ON 1K TQ OFF WHEN ROTATING,-25-30 KLBS WOB, PUW-71 K,SOW-70K,ROT-71 K WIPE 30'WITH PUMPS ON AFTER DRILLING STAND DOWN,RUN BACK DOWN ON ELEVATORS WITH PUMPS OFF -CYCLE PUMPS AFTER WIPE TO INTITATE GYRO SURVEY MINIMAL LOSSES TO FORMATION WHILE DRILLING AHEAD=SEEPAGE -MW IN/OUT=8.8 PPG DIFFICULTYACHEIVING BUILD RATES BEGINS AT 1024'MD 16:00 - 17:00 1.00 DRILL P SURF POOH ON ELEVATORS FROM 1,024'MD TO 224'MD TO PU ADDITIONAL BHA MONITOR WELL 10 MIN PRIOR TO PULLING OFF BOTTOM-STATIC PUW-69K,SOW-68K MONITOR TRIP BY LOOKING DOWN THE HOLE AS THE STAND IS PULLED. 17:00 - 17:30 0.50 DRILL P 1 SURF RIH ON ELEVATORS WITH 5"HWDP FROM 224'TO 968'MD -PU ONE STAND OF 4"DP&RIH FROM 968' MD TO 1,024'MD-NO FILL ON BOTTOM -PUW-91K,SOW-90K 17:30 - 00:00 1 6.50 DRILL P SURF DIRECTIONAL DRILL 12-1/4"SURFACE HOLE FROM 699'MD TO 1374'MD (676'IN 6.5 HRS= I 104 FPH WITH CONNECTIONS). -100-150 FPH INSTANTANEOUS ROP SLIDING, 150 FPH INSTANTANEOUS ROP ROTATING -550 GPM,1230PSI ON BOTTOM,1100 PSI OFF BOTTOM,50 RPM,3K TQ ON 1K TQ OFF WHEN ROTATING,- 25-30 KLBS WOB, PUW-71K,SOW-70K,ROT-71K -WIPE 30'WITH PUMPS ON AFTER DRILLING STAND DOWN,RUN BACK DOWN ON ELEVATORS WITH PUMPS OFF -CYCLE PUMPS AFTER WIPE TO INTITATE GYRO SURVEY -MINIMAL LOSSES TO FORMATION WHILE DRILLING AHEAD=SEEPAGE -MW IN/OUT=8.8 PPG,70 DEG MUD TEMP. OBSERVEDA GYRO SURVEY POINT AT 1157' MD WITH 5.02 DEG/100'DLS.PROCEEDED TO TAKE SURVEYS IN 30'INCREMENTS AND DETERMINED THAT SURVEYS AT THE FOLLOWING DEPTHS EXCEEDED THE 4 DEG/100'DLS LIMIT FROM WELL PROGRAM. WSL NOTIFIED ODE,AND RECIEVED APPROVAL TO DRILL AHEAD. -AT 1158'MD:4.88 DEG/100' -AT 1185'MD:5.46 DEG/100' -AT 1219'MD:6.55 DEG/100' Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 6 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/9/2017 00:00 - 04:30 4.50 DRILL P SURF DIRECTIONAL DRILL 12-1/4"SURFACE HOLE TO BASE OF PERMAFROST.FROM 1375'- 1844'MD (469'IN 5 HRS=94 FPH WITH CONNECTIONS. -100-150 FPH INSTANTANEOUS ROP SLIDING, 150 FPH INSTANTANEOUS ROP ROTATING -550 GPM,1550 PSI ON BOTTOM,1630 PSI OFF BOTTOM,50 RPM,5 KFT-LBS TQ ON 3 KFT-LBS TQ OFF WHEN ROTATING -25-30 KLBS WOB -PU=102 KLBS SO=95 KLBS ROT=99 KLBS WIPE 30'WITH PUMPS ON AFTER DRILLING STAND DOWN,RUN BACK DOWN ON ELEVATORS WITH PUMPS OFF -CYCLE PUMPS AFTER WIPE TO INTITATE GYRO SURVEY -MINIMAL LOSSES TO FORMATION WHILE DRILLING AHEAD -MUD WEIGHT:8.9 PPG IN,9 PPG OUT -FLOW LINE TEMP=70 DEGF 104:30 - 06.00 1.50 DRILL P SURF LCIRCULATE 2X BOTTOMS UP IN PREPARATION FOR PLANNED SHORT TRIP (12'ABOVE BPERM AT 1856'MD)AT 550 GPM TO CONDITION HOLE AND MUD -RACK BACK STAND EVERY 20 MINUTES -550 GPM,1400 PSI -OBSERVE NO INCREASE OR CHANGE IN RETURNS OVER SHAKERS AT BOTTOMS UP -MUD WEIGHT IN/OUT=8.9 PPG -MONITOR WELL FOR 10 MINUTES:STATIC 06:00 - 07:00 1.00 DRILL P SURF PLANNED WIPER TRIP:PULL OUT OF HOLE ON ELEVATORS FROM BASE OF 'PERMAFROST AT 1844'MD TO TOP OF DRILL COLLARS AT 216'MD WITH NO ISSUES -FOLLOW TRIPPING SPEEDS AS OUTLINED IN WELL PROGRAM -PU=102 KLBS,SO=95 KLBS AT 1830'MD -MONITOR WELL ON TRIP TANK:GOOD DISPLACEMENT 07:00 - 08:30 1.50 DRILL P SURF PLANNED WIPER TRIP:RUN IN HOLE ON ELEVATORS FROM 216'MD TO 1844'MD -ENCOUNTER TIGHT HOLE AT 565'-575'MD, ABLE TO WORK THROUGH WITH 20-30 KLBS DOWN,NO ORIENTATION NEEDED -FOLLOW TRIPPING SPEEDS AS OUTLINED IN WELL PROGRAM -PU=102 KLBS,SO=95 KLBS AT 1830'MD -MONITOR WELL VIA TRIP TANK:GOOD DISPLACEMENT Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* North America-ALASKA-BP • Page 7 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 12:00 3.50 DRILL P SURF DIRECTIONAL DRILL 12-1/4"SURFACE HOLE FROM 1844'MD TO 2170'MD PER BAKER DD (326'IN 3.5 HOURS=93 FPH WITH CONNECTIONS AND SURVEYS) -TAKE SURVEYS AT 3 POINTS WITH BOTH MWD AND GYRO TO CONFIRM MWD SURVEYS ARE CLEAR.SURVEY EVERY STAND WITH MWD ONLY FROM THIS POINT ON. 100-150 FPH INSTANTANEOUS ROP SLIDING, 150 FPH INSTANTANEOUS ROP ROTATING -550 GPM,1923 PSI ON BOTTOM,1815 PSI OFF BOTTOM,50 RPM,5 KFT-LBS TQ ON,3 KFT-LBS TQ OFF WHEN ROTATING -25-30 KLBS WOB -PU=113 KLBS,SO=96 KLBS,ROT=102 KLBS -WIPE 30'WITH PUMPS ON AFTER DIRLLING STAND DOWN,RUN BACK DOWN ON ELEVATORS WITH PUMPS OFF -MINIMAL LOSSES TO FORMATION WHILE DRILLING AHEAD(140 BBLS TOTAL LOSSES ON NIGHT TOUR) MUD WEIGHT:9.0 PPG IN,9.1 PPG OUT -FLOW LINE TEMP=73 DEGF,DOWNHOLE TEMP=83 DEGF -FLOW CHECK EVERY CONNECTION:BEGIN TO OBSERVE HYDRATE BREAK OUT AT-2100' MD -MAINTAIN HYDRATE AWARENESS,REVIEW HOLD POINTS WITH CREWS HYDRATE BREAK OUT OBSERVED BELOW ROTARY TABLE DURING FLOW CHECK: -MAX LEL NOTICED IN SHAKER HOUSE WAS 5%FOR A VERY SHORT TIME,THEN READING WENT BACK TO 0% -MAXIMUM DIFFERENCE BETWEEN PRESSURIZED/NONPRESSURIZED MW WAS 0.3 PPG -MUD WEIGHT IN WAS ALWAYS WEIGHTED UP TO PLAN PROPER NOTIFICATIONS WERE MADE PER THE HYDRATE MONITORING PLAN -ESTIMATED INTERVALS OF HYDRATE BREAK OUT LISTED IN REMARKS SECTION Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page s of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 19:00 7.00 DRILL P + SURF DIRECTIONAL DRILL 12-1/4"SURFACE HOLE FROM 2170'MD TO SECTION TD AT 2906'MD/ 2735'TVD(736'IN 7 HRS=105 FPH WITH CONNECTIONS AND SURVEYS) -100-150 FPH INSTANTANEOUS ROP SLIDING, 150 FPH INSTANTANEOUS ROP ROTATING • -650 GPM,2790 PSI ON BOTTOM,2720 PSI OFF BOTTOM,50 RPM,5 KFT-LBS TQ ON,4 KFT-LBS TO OFF -10-20 KLBS WOB -PU=121 KLBS,SO=103 KLBS,ROT=108 KLBS • -WIPE 30'WITH PUMPS ON AFTER DIRLLING STAND DOWN,RUN BACK DOWN ON ELEVATORS WITH PUMPS OFF SURVEY WITH MWD EVERY STAND -MUD WEIGHT:9.2 PPG IN,9.3 PPG OUT -FLOW LINE TEMP=76 DEGF,DOWNHOLE TEMP=95 DEGF -FLOW CHECK EVERY CONNECTION: OBSERVE SOME HYDRATE BREAK OUT BELOW ROTARY TABLE TD PICKED IN LOWER SV1 SHALE: -DRILLED 12'INTO SHALE,LEAVING 22'OF SHALE BELOW RATHOLE -PLANNED CASING SET DEPTH AT 2897'MD 19:00 - 20:30 1.50 DRILL P i SURF CIRCULATE 3X BOTTOMS UP AT SECTION TD (2906'MD)IN PREPARATION FOR WIPER TRIP TO BASE OF PERMAFROST • -650 GPM,2750 PSI -50 RPM,4 KFT-LBS TORQUE -RACK BACK ONE STAND WHILE CIRCULATING NO SIGNIFICANT CHANGE IN RETURNS OVER SHAKERS AT BOTTOMS UP FLOW CHECK WELL BEFORE PULLING OFF BOTTOM:OBSERVE HYDRATE BREAK OUT, FLUID LEVEL STABLE,NOT RISING 20:30 - 22:30 2.00 DRILL P SURF PLANNED WIPER TRIP:PULL OUT OF HOLE ON ELEVATORS FROM 2764'MD TO 1630'MD -MONITOR WELL FOR 10 MINUTES:STATIC -PU=122 KLBS,SO=102 KLBS AT 2764'MD -FOLLOW TRIPPING SPEEDS AS OUTLINED IN WELL PROGRAM -ENCOUNTER TIGHT HOLE AT 2220-2210'MD. • ABLE TO WIPE THROUGH WITH 2O-30 KLBS OVERPULL. 22:30 - 23:30 1.00 DRILL P SURF PLANNED WIPER TRIP:RUN IN HOLE ON ELEVATORS FROM 1630'MD TO 2906'MD -PU=108 KLBS,SO=80 KLBS AT 1630'MD -FOLLOW TRIPPING SPEEDS AS OUTLINED IN WELL PROGRAM -ENCOUNTER TIGHT HOLE AT 2135'MD.SET DOWN 30 KLBS,ABLE TO WIPE THROUGH. • 23:30 - 00:00 0.50 DRILL P SURF SERVICE TOP DRIVE,GREASE WASH PIPE. Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths' • North America-ALASKA-BP • Page 9 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/10/2017 00:00 - 02:00 2.00 DRILL P SURF CIRCULATE 3X BOTTOMS UP AT SECTION TD (2906'MD) -650 GPM,2600 PSI -50 RPM,5-7 KFT-LBS TORQUE -RACK BACK STAND EVERY 20 MINUTES -PU=122 KLBS,SO=102 KLBS,ROT=108 KLBS AT 2900'MD 02:00 - 05:00 3.00 DRILL P SURF PULL OUT OF HOLE ON ELEVATORS FROM 2900'MD TO 968'MD WITH NO ISSUES -FLOW CHECK WELL BEFORE PULLING OFF BOTTOM AND AT BHA:STATIC -FOLLOW TRIP SPEEDS AS OUTLINED IN !WELL PROGRAM:NO INDICATIONS OF SWABBING -MONITOR WELL VIA TRIP TANK:GOOD HOLE FILL -MUD WEIGHT:IN=9.2 PPG,OUT=9.2 PPG -PU=92 KLBS,SO=90 KLBS AT 960'MD 05:00 - 07:00 2.00 DRILL P SURF LAY DOWN 12-1/4"DRILLING BHA PER BAKER MWD/DD -MONITOR WELL VIA TRIP TANK:GOOD HOLE FILL } -BIT GRADE 1-1 07:00 08:00 1.00 CASING l P SURF CLEAN AND CLEAR RIG FLOOR,RIG UP CASING RUNNING EQUIPMENT. 08:00 - 09:00 1.00 CASING P SURF RIG UP TO RUN 9-5/8"HYDRIL 563 SURFACE CASING -MAKE UP VOLANT TOOL -INSTALL 8'BAIL EXTENSIONS AND 2507 SIDEDOOR ELEVATORS -RIG UP DOUBLE STACK POWER TONGS AND FILL UP HOSE 09:00 - 18:00 9.00 CASING P SURF RUN 9-5/8",40#,L-80,HYD 563 SURFACE CASING TO 2897'MD WITH NO ISSUES MAKE UP AND BAKER LOCK SHOE TRACK AND CHECK FLOATS -USE JET LUBE SEAL GUARD PIPE DOPE -TORQUE CONNECTIONS TO 15,500 FT-LBS PER HYDRIL REP -RUN FREE FLOATING CENTRALIZERS WITH STOP RING 5'FROM PIN ON JOINTS 1-63 OBTAIN PU/SO WEIGHTS EVERY 400': -PU=61 KLBS,SO=61 KLBS AT 900'MD -PU=145 KLBS,SO=115 KLBS AT 2897'MD RUN IN HOLE AT 90 FT/MIN PER TRIPPING SPEEDS IN WELL PROGRAM FROM SURFACE TO 2897'MD: -60 FT/MIN FROM SURFACE-910'MD -30 FT/MIN FROM 910'-1309'MD -20 FT/MIN FROM 1309'-2897'MD CIRCULATE DOWN EVERY 10TH JOINT WITH FULL BOTTOMS UP AT 571',910',1950'AT 7 BPM -MONITOR DISPLACEMENT WITH TRIP SHEET GOOD DISPLACEMENT -MUD WEIGHT:IN=9.2 PPG,OUT=9.2 PPG NO HYDRATES ISSUES ON RUN Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* North America-ALASKA-BP . Page 10 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 22:30 4.50 CASING P SURF CONDITION MUD AND STAGE UP TO CEMENTING RATE IN 1 BPM INCREMENTS TO 9.2 PPG,19 YP AND FINAL CIRCULATING RATE OF 10 BPM. -@ 2 BPM,205 PSI,3%RETURN FLOW -@ 3 BPM,220 PSI,4%RETURN FLOW @ 4 BPM,213 PSI,5%RETURN FLOW @ 5 BPM,220 PSI,9%RETURN FLOW @ 6 BPM,225 PSI,11%RETURN FLOW I-@ 7 BPM,250 PSI,12%RETURN FLOW -@ 8 BPM,265 PSI,12%RETURN FLOW -@ 9 BPM,262 PSI,13%RETURN FLOW -@ 10 BPM,260 PSI 14%RETURN FLOW -INITIAL CIRCULATING PRESSURE AT CEMENTING RATE OF 10 BPM=260 PSI 1-FINAL CIRCULATING PRESSURE AT CEMENTING RATE OF 10 BPM AFTER HOLE CONDITIONED=150 PSI -CIRCULATE A TOTAL OF-15X BOTTOMS UP RECIPROCATE PIPE 15 FT AT SURFACE AT 16 FT/MIN NO LOSSES DURING CIRCULATION 22:30 - 00:00 1.50 CASING P SURF CEMENT 9-5/8"SURFACE CASING AS •FOLLOWS:(CONTINUED ON 2/11/2017) -FILL LINES WITH WATER AND PRESSURE TEST TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH -PUMP 100 BBLS OF 10 PPG MUDPUSH II - !T SPACER @ 7 BPM,212 PSI Printed 4/3/2017 9.51:51AM `AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 11 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/11/2017 00:00 - 03:00 3.00 CASING P SURF CEMENT 9-5/8",40#,L-80,HYD 563 SURFACE CASING AS FOLLOWS(CONTINUED FROM I 102/10/2017): I PUMP 100 BBLS OF 10 PPG MUDPUSH II I SPACER @ 7 BPM,212 PSI :-DISENGAGE VOLANT TOOLAND RELEASE BOTTOM PLUG.VISUALLY INSPECT BURST DISC AFTER PUSHING DOWN WITH PLUG LAUNCHING TOOL(INTACT) PUMP 500 BBLS 1470 SACKS OF 11 PPG LITECRETE LEAD CEMENT©7 BPM,EXCESS I VOLUME 350%ABOVE THE PERMAFROST AND 40%EXCESS BELOW THE PERMAFROST j (YIELD 1.91 CU.FT/SK) -OBSERVE BOTTOM PLUG LAND AT 220 BBLS AWAY INTO LEAD(-7 BBLS LATE).BURST DISC WITH 350 PSI DIFFERENTIAL I RECIPROCATE PIPE WITH 10'STROKES WHILE PUMPING LEAD.STOP RECIPROCATION AND LAND ON RING WHEN MUD PUSH ROUNDS CORNER AND WHEN I LEAD CEMENT TURNS THE CORNER ! � -PUMP 48 BBLS 231 SACKS OF 15.8 PPG CLASS G TAIL @ 7 BPM(YIELD 1.17 CU.FT/SK) I I 1 1 '-DISENGAGE VOLANT TOOLAND RELEASE TOP PLUG -SCHLUMBERGER KICK OUT WITH 15 BBLS FRESH WATER I I I ,-PERFORM DISPLACEMENT WITH RIG I PUMPS AND 9.2 PPG MUD PER SLB CEMENTICS PROGRAM -75 BBLS DISPLACED AT 10 BPM:ICP 470 PSI 11%RETURN FLOW,FCP 545 PSI 11% I RETURN FLOW -185 BBLS DISPLACED AT 7 BPM:ICP 375 PSI 8%RETURN FLOW,FCP 795 PSI 8%RETURN FLOW -REDUCE RATE TO 2 BPM PRIOR TO PLUG I BUMP:FINAL CIRCULATING PRESSURE 580 PSI -BUMP PLUG ON CALCULATED STROKES AND INCREASE PRESSURE TO 1200 PSI. HOLD 1200 PSI FOR 5 MINUTES.BLEED OFF PRESSURE TO CHECK FLOATS-FLOATS GOOD TOTAL DISPLACEMENT VOLUME 198 BBLS (MEASURED BY STROKES©96%PUMP EFFICIENCY) RECIPROCATE PIPE 10 FT AT SURFACE DURING DISPLACEMENT,LAND ON RING AS CEMENT NEARS SURFACE,HOLE GETTING STICKY -167 BBLS OF CEMENT RETURNED TO SURFACE(CORRELATES TO 170%EXCESS IN PERMAFROST) -TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE:49 BBLS -CEMENT IN PLACE AT 02:00 Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths* North America-ALASKA-BP S Page 12 of 76 i "" Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date 3/15/2017 X3-017QH-C:(8,545,943 00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM I Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 03:00 - 06:00 3.00 CASING P SURF RIG DOWN CASING AND CEMENTING EQUIPMENT,CLEAN AND CLEAR RIG FLOOR -FLUSH STACK WITH BLACK WATER -BACK OUT AND LAY DOWN LANDING JOINT -RIG DOWN DOYON POWER TONGS AND VOLANT TOOL -RIG DOWN BAIL EXTENSIONS AND ELEVATORS -WASH SURFACE STACK AND KNIFE VALVE, FUNCTION ANNULAR MULTIPLE TIMES 06:00 - 09:00 3.00 BOPSUR P SURF NIPPLE DOWN DIVERTER SYSTEM -REMOVE FLOW RISER,RIG DOWN 16" OUTLET LINE,BREAK BOLTS ON ANNULAR AND KNIFE VALVE Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 13 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 22:00 13.00 BOPSUR N WAIT 2,906.00 SURF WAIT ON CEMENT TO BEGIN TO BUILD COMPRESSIVE STRENGTH PRIOR TO NIPPLING DOWN DIVERTER SYSTEM. I DURING WEEKEND MORNING CALL AT 08:00 WITH ANCHORAGE TEAM,CONCERNS WERE I RAISED ABOUT COMPLIANCE WITH FOLLOWING REQUIREMENT IN BP PRACTICE 100222;"ALL WELLS SHALL HAVE A PRIMARY WELL BARRIER PRIOR TO INSTALLING BOPS." CEMENT DURING TRANSITION PERIOD FROM LIQUID STATE TO SOLID STATE DOES NOT CONSTITUTE A BARRIER IN THE 9-5/8"ANNULUS TO PREVENT POSSIBLE SHALLOW WATER FLOW OR GAS FLOW I FROM DISASSOCIATED NATURAL GAS HYDRATES(BOTH IN SV FORMATIONS BELOW PERMAFROST). -09:00-11:30: RE-RIG UP DIVERTER OUTLET LINE,RE-INSTALL FLOW RISER AND AND RE-TIGHTEN BOLTS ON ANNULAR DIVERTER. RUN ONE STAND OF 4"DRILLPIPE IN THE HOLE AND MAKEUP TOP DRIVE. ESTABLISH I CONSTANT CIRCULATION OVER THE TOP OF THE WELL WITH THE TRIP TANK(NO GAINS/LOSSES THROUGHOUT DAY). : DIVERTER SYSTEM IS NOTA BARRIER, THOUGH IT IS A MITIGATION FOR THE HAZARD OF UNPLANNED WELL FLOW FROM I L 9-5/8"ANNULUS DURING THE CEMENT TRANSITION PERIOD. -11:30-22:00: CONSULT WITH ANCHORAGE TEAM AND HOUSTON TECHNICAL AUTHORITIES ON CEMENTING AND WELL I BARRIERS TO OBTAIN CLARITY ON INTENT OF BP 100221 (10-60)AND 100222(10-65) PRACTICES. DEVELOP AND OBTAIN APPROPRIATE APPROVALS FOR RISK ASSESSMENT THAT COVERS NIPPLING DOWN DIVERTER SYSTEM ONCE LEAD CEMENT BEGINS TO DEVELOP 'COMPRESSIVE STRENGTH(19 HOURS AFTER CEMENT IN PLACE). RECEIVE AUTHORIZATION TO PROCEED FROM WELLS OPERATIONS MANAGER(SEE ATTACHED RISK ASSESSMENT). SIMOPS WORKAROUND THE RIG: -PICK UP 4"DRILLPIPE STANDS WITH OFFLINE EQUIPMENT -LOAD AND WORK 7"CASING IN PIPE BARN -PERFORM ANNUAL MAINTENANCE/INSPECTION ON BOP STACK WITH THIRD PARTY QUAIL INSPECTORS -PERFORM WELDING REPAIRS ON LINES IN PUMP ROOM -CLEAN PITS AND LOAD NEW 9.2 PPG LSND -GENERAL RIG MAINTENANCE AND I CLEANING -COMPLETE 6 MONTH TORQUE CHECK ON ALL BOP STACK FLANGES Printed 4/3/2017 9:51:51AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP S Page 14 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 00:00 2.00 BOPSUR P SURF NIPPLE DOWN DIVERTER SYSTEM -DRAIN STACK BLOW DOWN HOLE FILL LINES,REMOVE FLOW RISER 2/12/2017 00:00 - 05:30 5.50 BOPSUR P SURF CONTINUE TO NIPPLE DOWN DIVERTER -ND 8'DIVERTER SECTION IN BOP DECK AND LAY DOWN -ND ANNULAR AND KNIFE VALVE,ND 20" RISERS -PREPARE WELLHEAD FOR CASING/TUBING _SPOOLS 05:30 - 08:00 2.50 WHSUR P SURF NIPPLE UP CASING SPOOL AND TUBING SPOOL PER FMC REP -NIPPLE UP DSAAND TORQUE ALL BOLTS TO SPEC -PRESSURE TEST WELL HEAD PER FMC TO 1000 PSI FOR 15 MINUTES:GOOD TEST(SEE ATTACHED CHART) 08:00 - 15:30 7.50 BOPSUR P SURF NIPPLE UP BOPE -PICK UP AND NIPPLE UP RISER AND BOPE STACK,HOOK UP CHOKE AND KILL LINES, TORQUE ALL BOLTS TO SPEC AND OBTAIN RKB'S RIG UP TURN BUCKLES AND HOLE FILL LINES -LOWER FLOW RISER AND PUT AIR IN AIR BOOTS -QUAIL INSPECTORS COMPLETE ANNUAL INSPECTION OF CAMERON BOP STACK SIMOPS:PRESSURE TEST CHOKE MANIFOLD OFFLINE(GOOD TEST) 15:30 - 19:30 4.00 BOPSUR P SURF PRESSURE TEST BOPE TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH FOLLOWING AOGCC REGULATIONS AND BP STANDARDS -AOGCC REP GUY COOK WAIVES WITNESS -TEST WITH 4"TEST JOINTS -PERFORM BLACKOUT TEST ON CONTROL PANELS -TEST ALARMS,PVT AND FLOW SHOW -PRESSURE TEST ALL OPENING AND CLOSING CHAMBERS TO 3000 PSI -TEST RAM LOCKS ON INITIAL TEST ALL TESTS PASS,SEE ATTACHED TEST CHARTS. 19:30 - 20:30 1.00 BOPSUR P SURF PULL TEST PLUG AND INSTALL 9-1/16"WEAR RING.RIG DOWN TEST JOINT AND RIG UP TO TEST 9-5/8"CASING. 20:30 - 21:00 0.50 BOPSUR P SURF SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT 21:00 - 22:30 1.50 CASING P SURF PRESSURE TEST 9-5/8"SURFACE CASING AGAINST THE BLIND RAMS FOR 250 PSI LOW FOR 5 MINUTES,3500 PSI HIGH FOR 30 MINUTES EACH.PASSING TEST.RECIEVED APPROVAL FROM SUPERINTENDENT CARLOS SCHIAVENATO TO PROCEED.SEE ATTACHED TEST CHART. -LOST 9 PSI IN FIRST 15 MINUTES -LOST 4 PSI IN SECOND 15 MINUTES -3.1 BBLS PUMPED/3.1 BBLS BLED BACK Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths` INorth America-ALASKA-BP I Page 15 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 00:00 1.50 CASING P SURF MAKE UP 8-3/4"RSS INTERMEDIATE DRILLING BHA PER BAKER MWD AND DD. -MAKE UP ROTARY STEERABLE,ONTRAK MWD,BCPM -8-3/4"T606X HUGHES BIT,RSS,ONTRAK (GR/RES/PWD/VSS/DIR),PULSER,(15)HWDP, JARS,(5)HWDP,WFD GHOST REAMER 3551' BACK FROM THE BIT,HT-38 TO SURFACE 2/13/2017 00:00 - 01:00 1.00 CASING P SURF CONTINUE MAKING UP 8-3/4"DRILLING BHA PER BAKER DD FROM SURFACE TO 804'MD -MONITOR WELL VIA TRIP TANK:GOOD DISPLACEMENT -PU=76 KLBS,SO=76 KLBS AT 800'MD 01:00 - 01:30 0.50 CASING P SURF RUN IN HOLE ON ELEVATORS FROM 804'TO 1100'MD AND STOP TO TAKE SURVEYS -MONITOR WELL VIA TRIP TANK:GOOD DISPLACEMENT 01:30 - 03:30 2.00 CASING N DPRB 2,906.00 SURF OBTAIN INCLINATION SURVEYS WITH INC AT BIT TOOL AT(1100'-1275'MD)AND(2650'- 2800'MD)PER BAKER MWD FOR DRILLSTRING SIDE FORCE MODELING. -SHALLOW HOLE TEST AT 1090'MD:GOOD TEST 03:30 - 04:30 1.00 CASING P SURF RUN IN HOLE ON ELEVATORS FROM 1100'MD TO 2650'MD AND TAG CEMENT -WASH DOWN FINAL 200'AND TAG TOP OF CEMENT AT 2772'MD(35'ABOVE PLUGS) -MONITOR WELL VIA TRIP TANK GOOD DISPLACEMENT -FILL PIPE EVERY 2000' AT 03:45 PERFORM(D1)KICK WHILE TRIPPING,STRIPPING AND WELL KILL DRILLS -REACTION TIME=2 MINUTES, CONTINGENCY FAILURE CASE#6 -HOLD AAR IN THE LER AFTER DRILLS 04:30 - 05:30 1.00 DRILL N DPRB 2,906.00 INTI OBTAIN INCLINATION SURVEYS WITH INC AT BIT TOOL AT(2650'-2800'MD)PER BAKER MWD FOR DRILLSTRING SIDE FORCE MODELING. -MONITOR WELL VIA TRIP TANK:GOOD DISPLACEMENT 05:30 - 07:30 2.00 CASING P SURF DRILL OUT SHOE TRACK AND PLUGS FROM 2772'MD TO 2887'MD -TAG TOP PLUG AT 2807'MD -400 GPM,1050 PSI,60 RPM,4-5 KFT-LBS TORQUE,5 KLBS WOB -OBSERVE HARD CEMENT RETURNS OVER THE SHAKERS 1-OBTAIN SLOW PUMP RATES MUD WEIGHT IN/OUT=9.2 PPG 07:30 - 08:30 1.00 CASING P SURF DISPLACE WELL FROM 9.2 PPG MAXDRIL-N SURFACE DRILLING FLUID WITH 9.2 PPG LSND INTERMEDIATE DRILLING FLUID -DISPLACE AT 550 GPM,1250 PSI,60 RPM -RECIPROCATE PIPE IN 50'STROKES -FOLLOW DISPLACEMENT SCHEDULE AND MONITOR PRESSURES PER BAROID DISPLACEMENT PROCEDURE -NO OVERDISPLACEMENT REQUIRED -OBTAIN NEW SLOW PUMP RATES Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths" • North America-ALASKA-BP S Page 16 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 09:30 1.00 CASING P SURF DRILL OUT REMAINDER OF SHOE TRACK+9' RAT HOLE+20'OF NEW FORMATION TO 2926' MD -550 GPM,1280 PSI,60 RPM,4-6 KFT-LBS TORQUE,5-10 KLBS WOB -CIRCULATE AND CONDITION MUD PRIOR TO LEAK OFF TEST -PULL BACK INTO SHOE AND FLOW CHECK WELL FOR 10 MINUTES:STATIC -MUD WEIGHT IN/OUT=9.2 PPG 09:30 - 10:30 1.00 DRILL P INTI PERFORM LEAK OFF TEST TO 15.5 PPG EQUIVALENT MUD WEIGHT -MUD WEIGHT=9.2 PPG,TVD=2727'MD -PUMP 2.2 BBLS TO 900 PSI,BLEED BACK 1.6 BBLS -CONSULT WITH ODE AND RECIEVE APPROVAL TO PROCEED(SEE ATTACHED LOT CHART) 10:30 18:00 7.50 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 2926' MD TO 3603'MD/3299'TVD IN SV1 AND UG4 I FORMATIONS -DRILL 680'IN 7.5 HRS=91 FT/HR WITH SURVEYS AND CONNECTIONS 175 FT/HR INSTANTANEOUS ROP 600 GPM,1760 PSI ON BOTTOM,1730 PSI OFF BOTTOM -180 RPM,4 KFT-LBS TORQUE ON,3 KFT-LBS TORQUE OFF,WOB=2-10 KLBS -NO BACKREAMING AT CONNECTIONS -PU=118 KLBS,SO=91 KLBS,ROT=100 KLBS -ECD ACTUAL=10.12 PPG,ECD HARD LINE= 11.3 PPG,CALCULATED ECD=9.59 PPG -SURVEY EVERY-90 FT -NO LOSSES OBSERVED WHILE DRILLING -MUD WEIGHT IN/OUT=9.2 PPG/9.0 PPG -OBTAIN NEW SPR'S AT 3072'MD/2858'TVD -OBSERVE SUSPECTED BIT BALLING AT 3230'MD IN UGNU.SUCCESSFULLY ALLEVIATE ISSUES WITH HIGH VIS,NUT PLUG,DRILL-N-SLIDE SWEEP. HYDRATE BREAK OUT OBSERVED AT SURFACE FROM 3141'-3362'MD IDENTIFIED HYDRATE ZONE ON RESISITIVITY LOG -OBSERVED BUBBLING AT BELL NIPPLE, FLUID LEVEL STATIC -PRESSURIZED/NONPRESSURZED MUD WEIGHT=9.2 PPG Printed 4/3/2017 9:51:51AM 'All depths reported in Drillers Depths* • North America-ALASKA-BP 410 Page 17 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task ' Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 3603' MD TO 4045'MD/3642'TVD DRILL 442'FT IN 5.5 HRS=80 FT/HR WITH SURVEYS AND CONNECTIONS 175 FT/HR INSTANTANEOUS ROP -600 GPM,1950 PSI ON BOTTOM,1870 PSI OFF BOTTOM -180 RPM,5 KFT-LBS TORQUE ON BOTTOM, 3-5 KFT-LBS TORQUE OFF BOTTOM,WOB=2 -10 KLBS -PU=125 KLBS,SO=99 KLBS, ROT=104 KLBS -ECD ACTUAL=10.12 PPG,ECD HARD LINE= 11.3 PPG,CALCULATED ECD=9.59 PPG -SURVEY EVERY-90 FT NO LOSSES OBSERVED WHILE DRILLING -MUD WEIGHT IN/OUT=9.2 PPG/9.0 PPG -OBTAIN NEW SPR'S AT 4023'MD/3638'TVD -PUMP HIGH VIS SWEEP AT 3750'MD AND OBSERVE MINOR INCREASE IN CUTTINGS OVER SHAKERS PUMP WEIGHTED SWEEP AT 4300'MD AND OBSERVE MINOR INCREASE IN CUTTINGS OVER SHAKERS OBSERVED TWO WASHOUTS AT SURFACE: -WASHOUT#1:AFTER MAKING A CONNECTION,PICKED UP BEGAIN ROTATING AND CIRCULATING,MUD BEGAN LEAKING/SPRAYING FROM TOOL JOINT. SHUT DOWN THE PUMPS AND OBSERVED PITTING ON PIN END OF DP JOINT AFTER INVESTIGATING SOURCE OF LEAK. WASHOUT#2 FOUND ON BOX END OF DIFFERENT JOINT IN THE SAME STAND -WASHOUT LOCATION#1 AND#2 WERE PREVIOUSLY MATED UP -CREWS ON HIGH ALERT FOR WASHOUTS, INSPECTING EACH CONNECTION PRIOR TO RUNNING IN THE HOLE -IF ANY PRESSURE ANOMOLIES ARE OBSERVED,CREW WILL EXECUTE WASHOUT DETECTION PLAN TO DIAGNOSE ANY POTENTIAL WASHOUTS Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* North America ALASKA-BP Page 18 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 'X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/14/2017 00:00 - 04:30 4.50 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 4045' MD TO 4547'MD/4024'TVD -DRILL 455 FT IN 4.5 HRS=101 FT/HR WITH SURVEYS AND CONNECTIONS -175 FT/HR INSTANTANEOUS ROP -600 GPM,2100 PSI ON BOTTOM,2050 PSI OFF BOTTOM -180 RPM,5 KFT-LBS TORQUE ON BOTTOM,4 KFT-LBS TORQUE OFF BOTTOM,WOB=10 KLBS -PU=132 KLBS,SO=108 KLBS,ROT=109 KLBS -ECD ACTUAL=10.15 PPG,ECD HARD LINE= 11.3 PPG,CALCULATED ECD=9.59 PPG 1-SURVEY EVERY-90 FT j-NO LOSSES OBSERVED WHILE DRILLING -MUD WEIGHT IN/OUT=9.2 PPG I-MUD WEIGHT PRESSURIZED/NONPRESSURIZED=9.2 PPG/ 8.9 PPG PUMP WEIGHTED SWEEPAT4214'MD, OBSERVE 10%INCREASE IN CUTTINGS AT 'BOTTOMS UP 04:30 - 05:00 0.50 DRILL P INT1 SERVICE RIG FLOOR EQUIPMENT,TOPE 1 DRIVE,BLOCKS,WASHPIPE. 105:00 - 05:30 0.50 DRILL P INTI MAN DOWN DRILL:PIT WATCHER FELL INTO PIT,ALERT EMERGENCY RESPONSE,HOLD AAR AND DISCUSS CORRECT CREW RESPONSE FOR THIS SCENARIO. 05:30 12:00 6.50 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 4500' MD TO 5253'MD/4552'TVD -DRILL 753 FT IN 6.5 HRS=116 FT/HR WITH SURVEYS AND CONNECTIONS -125-175 FT/HR INSTANTANEOUS ROP -600 GPM,2080 PSI ON BOTTOM,2060 PSI OFF BOTTOM -180 RPM,8 KFT-LBS TORQUE ON BOTOM,5 KFT-LBS TORQUE OFF BOTTOM,WOB=10 KLBS -PU=136 KLBS,SO=108 KLBS,ROT=116 KLBS -ECD ACTUAL=10.28 PPG,ECD HARD LINE= 11.3 PPG,CALCULATED ECD=9.59 PPG -SURVEY EVERY-90 FT -NO LOSSES OBSERVED WHILE DRILLING -PUMP HIGH VIS SWEEPS AT 4780'MD AND 5720'MD AND OBSERVE 0%AND 50% INCREASE IN CUTTINGS,RESPECTIVELY -MUD WEIGHT IN/OUT=9.2 PPG -NO SIGNS OF HYDRATES -MUD WEIGHT PRESSURIZED/NONPRESSUREIZED=9.2 PPG/8.9PPG -TAKE SLOW PUMP RATES AT 4969'MD/ 4400'MD Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* North America-ALASKA-BP • Page 19 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 18:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 5253' MD TO 5820'MD/5084'TVD -DRILL 567 FT IN 6 HRS=95 FT/HR WITH SURVEYS AND CONNECTIONS 125 FT/HR INSTANTANEOUS ROP -600 GPM,2800 PSI ON BOTTOM,2780 PSI OFF BOTTOM -180 RPM,8 KFT-LBS TORQUE ON BOTTOM, 5-7 KFT-LBS TORQUE OFF BOTTOM,WOB= 10 KLBS -PU=146 KLBS,SO=112 KLBS,ROT=120 IKLBS ECD ACTUAL=11 PPG,ECD HARD LINE= 11.3 PPG,CALCULATED ECD=10.2 PPG SURVEY EVERY-90 FT -AT-5300'BEGIN TO WEIGHT UP MUD FROM 9.2 PPG TO 9.8 PPG WITH A 290 BBL DILUTION WITH NEW 11.8 PPG WEIGHTED SPIKE FLUID PER BAROID MUD ENGINEER -NO LOSSES OBSERVED WHILE DRILLING -MUD WEIGHT IN/OUT=9.8 PPG 1-MUD WEIGHT PRESSURIZED/NON-PRESSUREIZED=9.8 PPG/9.4 PPG -TAKE SLOW PUMP RATES AT 5630'MD/ 4930'MD -PUMP HIGH VIS SWEEP AT 5725'MD AND DUMP RETURNS TO CUTTINGS BOX,75% INCREASE IN CUTTINGS. 18:00 00:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 5820' MD TO 6198'MD/5385'TVD -DRILL 378 FT IN 6 HRS=63 FT/HR WITH SURVEYS AND CONNECTIONS OBSERVE ECD INCREASE TO 11.2 PPG, DECREASE INSTANTANEOUS ROP TO 75 FT/HR -600 GPM,2915 PSI ON BOTTOM,2900 PSI OFF BOTTOM -180 RPM,6 KFT-LBS TORQUE ON BOTTOM,5 KFT-LBS TORQUE OFF BOTTOM,5-12 KLBS WOB -PU=148 KLBS,SO=115 KLBS,ROTATE= 124 KLBS -ECDACTUALAFTER DECREASING ROP= 10.81 PPG,ECD HARD LINE=11.3 PPG, CALCULATED ECD=10.2 -SURVEY EVERY-90 FT -MUD WEIGHT IN/OUT=9.8 PPG MUD WEIGHT PRESSURIZED/NON-PRESSURIZED=9.85 PPG/9.6 PPG -PUMPED HIGH VIS SWEEP AT 6009'MD AND DUMP RETURNS TO CUTTINGS BOX,75% INCREASE IN CUTTINGS. Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* 0 North America-ALASKA-BP • page 200f 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay ' Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/15/2017 00:00 - 06:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 6198' MD TO 6630'MD/5665'TVD IN THE CM2 -DRILL 432 FT IN 6 HRS=72 FT/HR WITH . SURVEYS AND CONNECTIONS INSTANTANEOUS ROP AT 100 FT/HR FOR ECD MANAGEMENT -600 GPM,3215 PSI ON BOTTOM,3117 PSI 1 OFF BOTTOM -180 RPM,6 KFT-LBS TORQUE ON BOTTOM,5 KFT-LBS TORQUE OFF BOTTOM,5-10 KLBS ' WOB -PU=152 KLBS,SO=121 KLBS,ROTATE= ,128 KLBS -ECD ACTUAL AFTER DECREASING ROP=11 PPG,ECD HARD LINE=11.3 PPG, CALCULATED ECD=10.2 PPG -SURVEY EVERY-90 FT -MUD WEIGHT IN/OUT=9.8 PPG -MUD WEIGHT PRESSURIZED/NON-PRESSURIZED=9.8 PPG /9.6 PPG PUMPED DRILL-N-SLIDE SWEEP AT 6200'MD TO MITIGATE POTENTIAL BIT BALLING NO INDICATIONS OF LOSSES OR BREATHING NO SIGNS OF HYDRATES,NO LEL I READINGS IN THE POSSUM BELLY !GHOST REAMER LEFT THE 9-5/8"SHOE INTO ' OPEN HOLE AT 6450'MD , -OBSERVE SOFTSPEED VARYING RPM AND OBSERVED TORQUE TREND SMOOTH OUT -GHOST REAMER IS-36 HOURS BEHIND THE BIT Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP . Page 21 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 6630' MD TO 6858'MD/5916'TVD IN THE CM1 -DRILL 228 FT IN 6 HRS=38 FT/HR WITH SURVEYS AND CONNECTIONS -INSTANTANEOUS ROP AT 50-75 FT/HR FOR ECD MANAGEMENT ' -600 GPM,3350 PSI ON BOTTOM,3280 PSI I OFF BOTTOM -180 RPM,6-8 KFT-LBS TORQUE ON BOTTOM,6 KLBS TORQUE OFF BOTTOM,12 KLBS WOB I-PU=156 KLBS,SO=125 KLBS,ROTATE= 130 KLBS -ECD ACTUAL=10.97 PPG,ECD HARD LINE= 11.3 PPG,CALCULATED ECD=10.2 PPG i ;-PRIOR TO INITIATING WEIGHT UP:MUD WEIGHT IN/OUT=9.8 PPG,MUD WEIGHT I PRESSURIZED/NONPRESSURIZED=9.8 PPG/ 9.6 PPG -NO SIGNS OF HYDRATES,NO LEL READINGS IN THE POSSUM BELLY NO SIGNS OF LOSSES OR BREATHING GRADUALLY BEGIN WEIGHT UP FROM 9.8 PPG TO 10.5 PPG WITH BLACK PRODUCTS: -BLEND 455 BBLS OF 12.1 PPG LSND SPIKE FLUID WITH BLACK PRODUCTS INTO THE CIRCULATING SYSTEM OVER—8 HOURS. -OBSERVE ECD BEGIN TO INCREASE FROM 11 PPG TO 11.2 PPG EMW -VARY PARAMETERS TO KEEP ECD'S DOWN: -DECREASE ROP FROM 75 FT/HR TO 50 FT/HR -DECREASE FLOW FROM 600 GPM TO 575 GPM Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* North America-ALASKA-BP • Page 22 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 18:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 6858' MD TO 6998'MD/6028'TVD IN THE CM1 DRILL 140 FT IN 6 HRS=23 FT/HR WITH SURVEYS AND CONNECTIONS -INSTANTANEOUS ROP=25-50 FT/HR FOR ECD MANAGEMENT -180 RPM,7 KFT-LBS TORQUE ON BOTTOM,6 KFT-LBS TORQUE OFF,2-6 KLBS WOB -PU=155 KLBS,126 KLBS,ROTATE=130 KLBS -ECD ACTUAL=11.2 PPG,REACH ECD HARD LINE OF 11.3 PPG AT 6998'MD 1-NO SIGNS OF HYDRATES,NO LEL READINGS IN POSSUM BELLY -NO SIGNS OF LOSSES OR BREATHING -REACH ECD HARD LINE AT 11.3 PPG EMW, PICK UP OFF BOTTOM AND DOWN LINK RSS RIBS CLOSED CONTINUING TO WEIGHT UP FROM 9.8 PPG TO 10.5 PPG -MONITOR MUD WEIGHT IN/OUT DURING WEIGHT UP:GOOD DURING WEIGHT UP ECD'S MAINTAINING AT 11.2 PPG EMW,VARY PARAMETERS TO MANAGE ECD -DECREASE FLOW RATE FROM 575 GPM TO 550 GPM -DECREASE ROP FROM 50 FT/HR TO 25 FT/HR -OBSERVE ECD INCREASE TO 11.3 PPG EMW,NOTIFIED ODE TO DEVELOP PLAN FORWARD -AT 10.5 PPG AND 500 GPM,CALCULATED ECD=10.71 PPG EMW -AT 10.5 PPG AND 600 GPM,CALCULATED ECD=10.87 PPG EMW 18:00 - 19:00 1.00 DRILL P INTI CIRCULATE BOTTOMS UP 1.5X 1-REDUCE FLOW RATE TO 500 GPM,2645 PSI -180 RPM,5 KFT-LBS TORQUE RECIPROCATED PIPE 45 FT WHILE CIRCULATING -OBSERVE ECD DECREASE FROM 11.3 PPG TO 11.15 PPG OVER CIRCULATION -PUMPED HIGH VIS SWEEP WITH NO INCREASE IN CUTTINGS Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 23 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 20:30 1.50 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 6998' MD TO 7047'MD/6067'TVD -DRILL 49 FT IN 1.5 HRS=32 FT/HR WITH SURVEYS AND CONNECTIONS -INSTANTANEOUS ROP 25-75 FT/HR -180 RPM, 6 KFT-LBS TORQUE ON BOTTOM, 5 KFT-LBS TORQUE,6 KLBS WOB -PU=156 KLBS,SO=125 KLBS,ROT=135 KLBS SURVEY EVERY 90 FT -MUD WEIGHT IN/OUT=10.5 PPG -MUD WEIGHT PRESSURIZED/NONPRESSURIZED=10.5 PPG -OBTAINED SLOW PUMP RATES AT 6998'MD ECD ACTUAL=11.3 PPG,ECD HARD LINE= 11.3,CALCULATED ECD=10.71 PPG,PICK UP OFF BOTTOM,AND DOWNLINK RIBS CLOSED ON RSS 20:30 - 00:00 3.50 DRILL P INTI CIRCULATE BOTTOMS UP 4.5X -525 GPM,2700 PSI -180 RPM,5 KFT-LBS TORQUE RECIPROCATE PIPE 90 FT DURING CIRCULATION,RACK BACK 3 STANDS DURING BOTTOMS UP -PUMP 25 BBL HIGH VIS SWEEP,NO INCREASE IN CUTTINGS RETURN RUN 3 STANDS BACK IN THE HOLE OBSERVE NO CHANGE IN ECD AFTER CIRCULATION,CONTACT ODE AND DISCUSS PLAN FORWARD,DECREASE RPM FROM 180 TO 150 TO MANAGE ECD'S 2/16/2017 00:00 - 06:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 7047' MD TO 7270'MD/6240'TVD IN THE CM1 -DRILL 223 FT IN 6 HRS=35 FT/HR WITH SURVEYS AND CONNECTIONS -INSTANTANEOUS ROP=30-50 FT/HR FOR ECD MANAGEMENT -500 GPM,2800 PSI ON BOTTOM,2790 PSI OFF BOTTOM -150 RPM,6 KFT-LBS TORQUE ON BOTTOM,5 KFT-LBS TORQUE OFF BOTTOM,5-10 KLBS WOB -PU=152 KLBS,SO=121 KLBS,ROTATE= 128 KLBS -ECD ACTUAL 11.3 PPG,ECD HARD LINE= 11.4 PPG(PER OCN#4),CALCULATED ECD AT 500 GPM=10.71 PPG -SURVEY EVERY-90 FT -MUD WEIGHT IN/OUT=10.5 PPG -MUD WEIGHT PRESSURIZED/NON-PRESSURIZED=10.5 PPG/10.2 PPG -PUMPED LOW VIS/HIGH VIS SWEEP AT 7150'MD,OBSERVE NO INCREASE IN RETURNS -NO INDICATIONS OF LOSSES OR BREATHING -NO SIGNS OF HYDRATES,NO LEL READINGS IN THE POSSUM BELLY Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* 410 North America ALASKA-BP Page 24 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 7270' 'MDTO7519'MD/6446'TVD INTHE HRZ -DRILL 249 FT IN 6 HRS=41.5 FT/HR WITH SURVEYS AND CONNECTIONS -INSTANTANEOUS ROP=30-60 FT/HR FOR ECD MANAGEMENT -500 GPM,2800 PSI ON BOTTOM,2790 PSI OFF BOTTOM -150 RPM,6 KFT-LBS TORQUE ON BOTTOM,5 KFT-LBS TORQUE OFF BOTTOM,5-10 KLBS WOB -PU=152 KLBS,SO=121 KLBS,ROTATE= 128 KLBS -ECD ACTUAL 11.3 PPG,ECD HARD LINE= 11.4 PPG(PER OCN#4),CALCULATED ECD AT 500 GPM=10.74 PPG -SURVEY EVERY-90 FT -TAKE NEW SLOW PUMP RATES AT 7339'MD -MUD WEIGHT IN/OUT=10.5 PPG -MUD WEIGHT PRESSURIZED/NON-PRESSURIZED=10.5 PPG/10.2 PPG -NO INDICATIONS OF LOSSES OR BREATHING -NO SIGNS OF HYDRATES,NO LEL READINGS IN THE POSSUM BELLY 12:00 - 18:00 6.00 I DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 7519' MD-7709'MD/6599'TVD IN THE HRZ DRILL 190 FT IN 6 HRS=32 FT/HR WITH SURVEYS AND CONNECTIONS INSTANTANEOUS ROP=30-60 FT/HR FOR ECD MANAGEMENT -500 GPM,2920 PSI ON BOTTOM,2900 PSI OFF BOTTOM -120 RPM,7 KFT-LBS TORQUE ON BOTTOM,4 -5 KFT-LBS TORQUE OFF BOTTOM,9 KLBS WOB -PU=165 KLBS,SO=130 KLBS,ROTATE= 141 KLBS -ECD ACTUAL 11.37 PPG,ECD HARD LINE= 11.4 PPG(PER OCN#4),CALCULATED ECD AT 500 GPM=10.74 PPG -SURVEY EVERY-90 FT -TAKE NEW SLOW PUMP RATES AT 7339'MD -MUD WEIGHT IN/OUT=10.5 PPG -MUD WEIGHT PRESSURIZED/NON-PRESSURIZED=10.5 PPG/10.2 PPG -NO INDICATIONS OF LOSSES OR BREATHING -NO SIGNS OF HYDRATES,NO LEL READINGS IN THE POSSUM BELLY -TAKE NEW SLOW PUMP RATES AT 7521'MD Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP 5 Page 25 ores Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 23:30 5.50 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 7709' MD-7965'/6815'TVD IN THE HRZ -DRILL 256 FT IN 5.5 HRS=47 FT/HR WITH SURVEYS AND CONNECTIONS -INSTANTANEOUS ROP=30-60 FT/HR FOR ECD MANAGEMENT -500 GPM,2990 PSI ON BOTTOM,2920 PSI OFF BOTTOM -120 RPM,7 KFT-LBS TORQUE ON BOTTOM,6 KFT-LBS TORQUE OFF BOTTOM,8 KLBS WOB -PU=169 KLBS,SO=133 KLBS,ROTATE= 1144 KLBS ECD ACTUAL 11.37 PPG,ECD HARD LINE= 11.4 PPG(PER OCN#4),CALCULATED ECD AT 500 GPM=10.74 PPG -SURVEY EVERY-90 FT -TAKE NEW SLOW PUMP RATES AT 7339'MD -MUD WEIGHT IN/OUT=10.5 PPG -MUD WEIGHT PRESSURIZED/NON-PRESSURIZED=10.5 'PPG/10.4 PPG -NO INDICATIONS OF LOSSES OR BREATHING NO SIGNS OF HYDRATES,NO LEL READINGS IN THE POSSUM BELLY -PUMP 35 BBL HIGH VIS SWEEP,MINIMAL TO NO INCREASE IN CUTTINGS RETURNS 23:30 - 00:00 0.50 DRILL P INTI SERVICE TOP DRIVE,GREASE WASH PIPE AND CHECK OIL LEVELS. 2/17/2017 00:00 - 06:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 7965' -8200'MD/7007'TVD IN THE KUD -DRILL 235 FT IN 6 HRS=32 FT/HR WITH SURVEYS AND CONNECTIONS INSTANTANEOUS ROP=30-60 FT/HR FOR ECD MANAGEMENT -500 GPM,3042 PSI ON BOTTOM,3020 PSI OFF BOTTOM -120 RPM,7 KFT-LBS TORQUE ON BOTTOM,6 KFT-LBS TORQUE OFF BOTTOM,8 KLBS WOB -PU=175 KLBS,SO=140 KLBS,ROTATE= 154 KLBS -ECD ACTUAL 11.33 PPG,ECD HARD LINE= 11.4 PPG(PER OCN#4),CALCULATED ECD AT 500 GPM=10.73 PPG -SURVEY EVERY-90 FT -MUD WEIGHT IN/OUT=10.5 PPG -MUD WEIGHT PRESSURIZED/NON-PRESSURIZED=10.5 PPG/10.4 PPG -NO INDICATIONS OF LOSSES OR BREATHING -NO SIGNS OF HYDRATES,NO LEL READINGS IN THE POSSUM BELLY -TAKE SLOW PUMP RATES Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 26 of 76 Operation Summary Report Common Wet Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) .-...-.-_-._._.. .. . __ _ Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations 4 (hr) (usft) 06:00 - 12:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 8200' MD-8495'MD/7280'TVD IN THE TMLV DRILL 295 FT IN 6 HRS=50 FT/HR WITH SURVEYS AND CONNECTIONS -INSTANTANEOUS ROP=30-60 FT/HR FOR ECD MANAGEMENT -500 GPM,3185 PSI ON BOTTOM,3150 PSI OFF BOTTOM -120 RPM,8 KFT-LBS TORQUE ON BOTTOM,6 KFT-LBS TORQUE OFF BOTTOM,8 KLBS WOB -PU=180 KLBS,SO=139 KLBS,ROTATE= 153 KLBS -ECD ACTUAL 11.3 PPG,ECD HARD LINE= 11.4 PPG(PER OCN#4),CALCULATED ECD AT 500 GPM=10.73 PPG -SURVEY EVERY-90 FT ' -MUD WEIGHT IN/OUT=10.55 PPG -MUD WEIGHT PRESSURIZED/NON-PRESSURIZED=10.55 PPG/10.4 PPG -NO INDICATIONS OF LOSSES OR BREATHING -NO SIGNS OF HYDRATES,NO LEL ' READINGS IN THE POSSUM BELLY -OBSERVE FAULT AT 8381'MD/7181'TVD, TKNG OBSERVED 139'HIGH OF PROGNOSED TOP 12:00 - 18:00 6.00 DRILL P 1 1 INTI 'DRILL 8-3/4"INTERMEDIATE HOLE FROM 8495'MD-8765/7519'TVD IN THE TMLV -DRILL 270 FT IN 6 HRS=45 FT/HR WITH SURVEYS AND CONNECTIONS -INSTANTANEOUS ROP=30-60 FT/HR FOR ECD MANAGEMENT -500 GPM,3250 PSI ON BOTTOM,3165 PSI OFF BOTTOM -120 RPM,8 KFT-LBS TORQUE ON BOTTOM,5 KFT-LBS TORQUE OFF BOTTOM,7 KLBS WOB -PU=194 KLBS,SO=144 KLBS,ROTATE= ' 157 KLBS -ECD ACTUAL 11.3 PPG,ECD HARD LINE= 11.4 PPG(PER OCN#4),CALCULATED ECD AT 500 GPM=10.74 PPG -SURVEY EVERY-90 FT -MUD WEIGHT IN/OUT=10.5 PPG -MUD WEIGHT PRESSURIZED/NON-PRESSURIZED=10.5 PPG/10.25 PPG NO INDICATIONS OF LOSSES OR BREATHING -NO SIGNS OF HYDRATES,NO LEL READINGS IN THE POSSUM BELLY Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths" III North America-ALASKA-BP • Page 27 of 76 Operation Summary Report Common Well Name:V-O8 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM IRig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date 1 From-To Hrs Task 1 Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 23:30 5.50 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 8765'MD-8970'MD/7696'TVD IN THE KINGAK SHALE -DRILL 205 FT IN 5.5 HRS=37 FT/HR WITH I SURVEYS AND CONNECTIONS 1-INSTANTANEOUS ROP=30-60 FT/HR FOR ECD MANAGEMENT 500 GPM,3250 PSI ON BOTTOM,3165 PSI OFF BOTTOM I-120 RPM,7 KFT-LBS TORQUE ON BOTTOM,7 KFT-LBS TORQUE OFF BOTTOM,5-8 KLBS WOB -PU=194 KLBS,SO=144 KLBS,ROTATE= 157 KLBS ECD ACTUAL 11.33 PPG,ECD HARD LINE= 11.4 PPG(PER OCN#4),CALCULATED ECD AT 500 GPM=10.73 PPG -SURVEY EVERY-90 FT -MUD WEIGHT IN/OUT=10.5 PPG -MUD WEIGHT I PRESSURIZED/NON-PRESSURIZED=10.5 PPG/10.25 PPG NO INDICATIONS OF LOSSES OR (BREATHING I I-NO SIGNS OF HYDRATES,NO LEL READINGS IN THE POSSUM BELLY -PERFORM 290 BBL MUD DILUTION 23:30 - 00:00 0.50 DRILL P i INTI 1SERVICE TOP DRIVE 2/18/2017 00:00 - 06:00 6.00 DRILL 1 P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 8970'MD- 9240'MD/7895'TVD IN THE KINGAK SHALE -DRILL 270 FT IN 6 HRS=45 FT/HR WITH SURVEYS AND CONNECTIONS -INSTANTANEOUS ROP=50-65 FT/HR FOR ECD MANAGEMENT '-500 GPM,3250 PSI ON BOTTOM,3165 PSI OFF BOTTOM -120 RPM,7 KFT-LBS TORQUE ON BOTTOM,7 KFT-LBS TORQUE OFF BOTTOM,5-8 KLBS WOB -PU=194 KLBS,SO=144 KLBS,ROTATE= 157 KLBS -ECD ACTUAL 11.33 PPG,ECD HARD LINE= 11.4 PPG(PER OCN#4),CALCULATED ECD AT 500 GPM=10.73 PPG -SURVEY EVERY-90 FT MUD WEIGHT IN/OUT=10.5 PPG MUD WEIGHT PRESSURIZED/NON-PRESSURIZED=10.5 PPG/10.20 PPG -NO INDICATIONS OF LOSSES OR BREATHING -NO SIGNS OF HYDRATES,NO LEL READINGS IN THE POSSUM BELLY -PUMP HI VIS SWEEP AT 9033'MD WITH NO INCREASE IN CUTTINGS Printed 4/3/2017 9.51:51AM 'All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 28 of zs Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. 'BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 9240'MD-9504'MD/8164'TVD IN THE KINGAK SHALE -DRILL 264 FT IN 6 HRS=44 FT/HR WITH SURVEYS AND CONNECTIONS -INSTANTANEOUS ROP=50-70 FT/HR FOR ECD MANAGEMENT -500 GPM,3200 PSI ON BOTTOM,3150 PSI OFF BOTTOM -120 RPM,9 KFT-LBS TORQUE ON BOTTOM,7 KFT-LBS TORQUE OFF BOTTOM,12 KLBS WOB PU=204 KLBS,SO=149 KLBS,ROTATE= 164 KLBS ECD ACTUAL 11.27 PPG,ECD HARD LINE= 11.4 PPG(PER OCN#4),CALCULATED ECD AT 500 GPM=10.74 PPG -SURVEY EVERY-90 FT -MUD WEIGHT IN/OUT=10.5 PPG MUD WEIGHT PRESSURIZED/NON-PRESSURIZED=10.5 PPG/10.25 PPG NO INDICATIONS OF LOSSES OR BREATHING NO SIGNS OF HYDRATES,NO LEL READINGS IN THE POSSUM BELLY PUMP HI VIS SWEEP AT 9412'MD WITH 50% INCREASE IN CUTTINGS 12:00 - 18:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 9504'MD-9787'MD/8414'TVD IN THE KINGAK SHALE -DRILL 283 FT IN 6 HRS=47 FT/HR WITH SURVEYS AND CONNECTIONS INSTANTANEOUS ROP=50-70 FT/HR FOR ECD MANAGEMENT -500 GPM,3260 PSI ON BOTTOM,3220 PSI OFF BOTTOM -120 RPM,10 KFT-LBS TORQUE ON BOTTOM, 7 KFT-LBS TORQUE OFF BOTTOM,13 KLBS WOB -PU=212 KLBS,SO=155 KLBS,ROTATE= 170 KLBS -ECD ACTUAL 11.24 PPG,ECD HARD LINE= 11.4 PPG(PER OCN#4),CALCULATED ECD AT 500 GPM=10.74 PPG -SURVEY EVERY-90 FT -MUD WEIGHT IN/OUT=10.5 PPG -MUD WEIGHT PRESSURIZED/NON-PRESSURIZED=10.5 PPG/10.25 PPG NO INDICATIONS OF LOSSES OR BREATHING -NO SIGNS OF HYDRATES,NO LEL READINGS IN THE POSSUM BELLY -TAKE SLOW PUMP RATES AT 9598'MD -STOP THE JOB DRILL:OFFLINE STAND BUILDING,LATCH KEEPER PIN CAME OUT WHILE PICKING UP JOINT Printed 4/3/2017 9:51:51AM *AII depths reported in Drillers Depths* •0 North America-ALASKA-BP Page 29 of 76 Operation Summary Report 1 Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 9787'MD-10078'MD/8665'TVD IN THE KINGAK SHALE I DRILL 291 FT IN 6 HRS=49 FT/HR WITH SURVEYS AND CONNECTIONS -INSTANTANEOUS ROP=50-70 FT/HR FOR ECD MANAGEMENT -500 GPM,3270 PSI ON BOTTOM,3250 PSI OFF BOTTOM 120 RPM,10 KFT-LBS TORQUE ON BOTTOM, 8 KFT-LBS TORQUE OFF BOTTOM,8-10 KLBS WOB -PU=219 KLBS,SO=154 KLBS,ROTATE= 170 KLBS ECD ACTUAL 11.23 PPG,ECD HARD LINE= 111.4 PPG(PER OCN#4),CALCULATED ECD AT 500 GPM=10.74 PPG '-SURVEY EVERY-90 FT MUD WEIGHT IN/OUT=10.5 PPG MUD WEIGHT ' PRESSURIZED/NON-PRESSURIZED=10.5 PPG/10.25 PPG '-NO INDICATIONS OF LOSSES OR BREATHING NO SIGNS OF HYDRATES,NO LEL — READINGS IN THE POSSUM BELLY Printed 4/3/2017 9:51:51AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 30 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/19/2017 00:00 - 06:00 6.00 DRILL P INTI DIRECTIONAL DRILL AHEAD IN 8-3/4"INT HOLE FROM 10078'MD TO 10145'MD,8723' -60-70 FPH INSTANTANEOUS RATE -500 GPM,3080 PSI,120 RPM,10 KFT-LBS 1 TRQ ON/OFF BOTTOM,10-12 KLBS WOB -MW IN/OUT=10.5 PPG -ECD CLEANHOLE=10.74 PPG,ACTUAL= 11.2 PPG,LIMIT=11.4 PPG -SURVEY EVERY STAND AND NO BACKREAMING AT CONNECTIONS NO LOSSES WHILE DRILLING AHEAD -TAKE SPR ON BOTTOM 7"CASING POINT PICK: ENCOUNTER REVERSE DRILLING BREAK AT TJB MARKER(9957'MD).TSGR EXPECTED AT 10143'MD(186'MD FROM TJB MARKER). -FIX WOB AT 6 KLBS AND KEEP ALL OTHER DRILLING PARAMETERS CONSTANT FROM TOP TJB MARKER -ENCOUNTER SECOND REVERSE DRILLING BREAK AT 10135'MD.DRILLADDITIONAL 5' MD PER CASING PICK PROCEDURE TO 10140' MD AND CIRCULATE BOTTOMS UP TO CHECK 'SAMPLES.NO PRESENCE OF SAG RIVER IN FIRST SAMPLE,CONTINUE DRILLING AHEAD. -FIX WOB AT 12 KLBS AND KEEP ALL OTHER PARAMETERS CONSTANT.DRILL AHEAD ADDITIONAL 5'MD PER CASING PICK PROCEDURE TO 10145'MD AND CIRCULATE BOTTOMS UP TO CHECK SAMPLES -CIRCULATE BOTTOMS UP AND OBSERVE SAG RIVER SAND WITH GLAUCONITE IN SAMPLES. -TOP OF SAG RIVER PICKED AT 10140'MD.7" CASING PLANNED FOR 10141'MD(1'INTO SAG RIVER,4'RATHOLE) 06:00 - 08.30 2.50 DRILL P INTI CIRCULATE HOLE CLEAN,3X BOTTOMS UP -500 GPM,3070 PSI,120 RPM,8.5 KFT-LBS TRQ -MW IN/OUT 10.5 PPG -PUMP(2)30 BBL HIGH-VIS SWEEPS;50% INCREASE AND 25%INCREASE OBSERVED AT SHAKERS 08:30 - 09:00 0.50 BOPSUR P INTI PERFORM WEEKLY BOPE FUNCTION TEST ANNULAR;28 SECONDS TO CLOSE -UPPER AND LOWER 2-7/8"x 5"VBR;7 SECONDS EACH TO CLOSE -CHOKE AND KILL HCR;1 SECOND TO CLOSE -ALL FUNCTIONED ON 4"DRILL PIPE BLIND/SHEAR RAMS WILL BE FUNCTIONED AS SOON AS DRILLSTRING IS PULLED OUT OF THE HOLE Printed 4/3/2017 9.51:51AM 'All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 31 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-OS ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 14:00 5.00 DRILL P INTI PUMP OUT OF THE HOLE FROM 10145'MD TO 6419'MD -MONITOR WELL FOR 10 MINUTES PRIOR TO r PULLING OFF BOTTOM;STATIC -PU 230K,SO 148KAT 10145'MD -PUMP AT 2 BPM WHILE PULLING AT 50 FT/MIN MW IN/OUT 10.5 PPG -PULLED TIGHT WITH 30K OVER AT 8700'MD, WIPED SECTION AND PULLED THROUGH WITH NO DRAG NOTED. 14:00 - 15:30 1.50 DRILL N I DPRB 10,145.00 INTI CIRCULATE HOLE CLEAN AT 6419'MD,GHOST REAMER AT CASING SHOE 550 GPM,2800 PSI,150 RPM,7 KFT-LBS RECIPROCATE ONE STAND WHILE CIRCULATING -OBSERVE 50%INCREASE IN CLAY(UGNU) OVER THE SHAKERS 15:30 - 18:00 2.50 DRILL P INTI RUN IN HOLE ON ELEVATORS FROM 6419'MD TO 9850'MD PU=162 KLBS,SO=111 KLBSAT6419'MD MW IN/OUT=10.5 PPG -FILL PIPE EVERY 2000'MD 1-TAG UP AT 9850'MD,AND ATTEMPT TO BREAK CIRCULATION.UNABLE TO PUMP DUE TO PLUGGED JETS. 18:00 - 21:00 3.00 DRILL P INTI TROUBLESHOOT PLUGGED JETS AT 9850'MD -WORK PIPE WITH AND WITHOUT PUMPS, USING THE BLEEDER TO CLEAR PLUGGED JETS -STAGE UP PUMPS TO 500 GPM,3200 PSI -CIRCULATE BOTTOMS UP OBSERVE UGNU CLAY OVER THE SHAKERS 21:00 - 22:00 1.00 DRILL P INTI WASH DOWN FROM 9850'MD TO 10145'MD -500 GPM,3300 PSI -TAG 30'OF FILL ON BOTTOM ROTATE DOWN AT5RPM 22:00 - 22:30 0.50 DRILL P INTI SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT 22:30 - 00:00 1.50 DRILL P INTI CIRCULATE AT 10145 AND CONDITION MUD FOR FINAL TRIP OUT OF THE HOLE -500 GPM,3252,120 RPM,8 KFT-LBS TORQUE -WORK PIPE IN 70'STROKES -OBSERVE SHALE OVER THE SHAKERS, CLEANED UP AFTER 3X BOTTOMS UP Printed 4/3/2017 9:51:51AM 'All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 32 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/20/2017 00:00 - 03:30 3.50 DRILL P INTI STAGE UP PUMPS TO CIRCULATE 4-5X !BOTTOMS UP AND CONDITION MUD AT TD BEFORE FINAL TRIP OUT OF THE HOLE INITIALLY PUMP AT 500 GPM,3200 PSI AND 11.34 PPG ECD 1-CONTINUE TO PUMP AT 500 GPM AND OBSERVE PRESURE DECREASE TO 2970 AND ECD DECREASE TO 11.04 PPG EMW -ROTATE AT 120 GPM,8-9 KFT-LBS TORQUE -MUD WEIGHT IN/OUT=10.5 PPG -RECIPROCATE 90'STANDS -PUMP HI-VIS SWEEP -PERFORM 290 BBL MUD DILUTION -OBSERVE NO SIGNIFICANT INCREASE IN CUTTINGS OVER THE SHAKERS WITH "SWEEP 03:30 - 11:00 7.50 DRILL P INTI PUMP OUT OF THE HOLE FROM 10,145'MD TO 4000'MD -MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM;STATIC -2 BPM,350 PSI,PU 230K,SO 138KAT 10145' MD -MW IN/OUT 10.5 PPG PULL AT 50 FT/MIN TO 6000'MD,70 FT/MIN FROM 6000'MD TO 4000'MD -NO TIGHT SPOTS OR ISSUES OBSERVED 11:00 - 12:30 1.50 DRILL P INTI PULL OUT OF THE HOLE ON ELEVATORS FROM 4000'MD TO 2889'MD-INSIDE 9-5/8" CASING SHOE -PU 112K,SO 89K AT 3459'MD -MW IN/OUT=10.5 PPG -MONITOR WELL FOR 10 MINUTES AT CASING SHOE,STATIC 12:30 - 13:00 0.50 DRILL P INTI CIRCULATE BOTTOMS UP AT 9-5/8"CASING SHOE -550 GPM,1750 PSI,80 RPM,4K FT-LBS TRQ 13:00 - 15:00 2.00 DRILL P INTI CONTINUE TO PULL OUT OF THE HOLE ON ELEVATORS FROM 2889'MD TO 804'MD -MONITOR WELL FOR 10 MINUTES AT CASING SHOE,STATIC PU 96K,SO 88KAT 2889'MD -MW IN/OUT=10.5 PPG 15:00 - 17:00 2.00 DRILL P INTI PULL AND LAY DOWN 8-3/4"INTERMEDIATE DRILLING ASSEMBLY -MONITOR WELL FOR 10 MINS PRIOR TO PULLING BHA,STATIC LAY DOWN 20 JTS OF 5"HWDP AND JARS -LAY DOWN NON-MAG COLLARS,FLOAT AND FILTER SUB -LAY DOWN BCPM,ONTRAK AND AUTOTRAK ROTARY STEERABLE -BIT GRADE:1-1-CT-T-X-I-NO-TD -GHOST REAMER 5/16"UNDER GAUGE AND SHOWED SIGNIFICANT SIGNS OF WEAR ON LEADING EDGE. 17:00 - 17:30 0.50 BOPSUR P INTI I CLEAN AND CLEAR RIG FLOOR Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP S Page 33 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM ,Rig Release:3/20/2017 Rig Contractor.PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 19:00 1.50 BOPSUR P INTI CHANGE UPPER PIPE RAMS TO 7"FBR FOR 7"CASING RUN -CLOSE BLIND/SHEAR RAMS AND LINE UP TO MONITOR WELL UTILIZING CHARGE PUMP 'THROUGH MUD CROSS TO THE MUD/GAS SEPARATOR -CHANGE UPPER RAMS FROM 2-7/8"x 5"VBR TO 7"FBR -WELL STATIC DURING RAM CHANGE OPERATION -PULL WEAR RING AND INSTALL TEST PLUG SIMOPS: -RIG UP DOYON CASING TONGS,BAIL EXTENSIONS AND ELEVATORS FOR 7" CASING MAKE UP XO AND FOSV FOR 7"VAMTOP HC 19:00 - 19:30 0.50 BOPSUR P INTI PRESSURE TEST 7"UPPER PIPE RAMS,250 PSI LOW 3500 PSI HIGH FOR 5 CHARTED MIN EACH -TEST WITH 7"TEST JOINT;GOOD TEST -SEE ATTACHED TEST CHART -COMPLETE WEEKLY FUNCTION TEST BY FUNCTION TESTING BLIND/SHEAR RAMS 19:30 - 20:00 0.50 BOPSUR P INTI RIG DOWN FROM TESTING UPPER PIPE RAMS -PULL TEST PLUG -LAY DOWN 7"TEST JOINT 20:00 - 20:30 0.50 CASING P INTI RIG UP TO RUN 7",26#/FT VAMTOP HC INTERMEDIATE CASING STRING RIG UP FILL UP HOSE -STAGE EQUIPMENT ON RIG FLOOR SIMOPS: WEATHERFORD RE-PINNEDACPTO SHEAR AT 2400 PSI AFTER DISCUSSION AND APPROVAL FROM ODE. 20:30 - 23:30 3.00 CASING P INTI RUN 7",26#/FT VAMTOP HC CASING TO 1574' MD -PICK UP SHOE JOINT AND RIG UP VOLANT TOOL -BAKERLOK SHOE TRACK JOINTS AND MAKE UP TO THE MARK -CHECK FLOATS,HOLDING -USE JET LUBE SEAL GUARD PIPE DOPE ON ALL VAMTOP HC CONNECTIONS -TORQUE TURN ALL VAMTOP HC CONNECTIONS TO 11,950 FT-LBS -RUN IN THE HOLE AT 90 FT/MIN FROM SURFACE TO 1574'MD -FILL CASING EVERY JOINT WITH FILL UP HOSE -BREAK CIRCULATION EVERY 10 JOINTS AT 5 BPM FOR 15 BBLS -OBTAIN PU/SO WEIGHTS EVERY 10 JOINTS -MUD WEIGHT IN/OUT=10.5 PPG 23:30 - 00:00 0.50 CASING P INTI SERVICE PIPE CAT Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* • North America-ALASKA BP Page 34 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM Rig Release:3/20/2017 Rig Contractor PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/21/2017 00:00 - 23:30 23.50 CASING P INTI CONTINUE TO RUN 7",26#,VAMTOP HC CASING FROM 1574'TO 10141'MD -USE JET LUBE SEAL GUARD PIPE DOPE ON ALL VAMTOP HC CONNECTIONS TORQUE TURN ALL VAMTOP HC CONNECTIONS TO 11,950 FT-LBS ' RUN 1 FLOATING CENTRALIZER WITH STOP RING 5'FROM PIN ON JOINTS 1-165 I -TRIPPING SPEEDS:90 FPM FROM 1574'TO 3523'MD,80 FPM FROM 3523'TO 4670'MD,60 FPM FROM 4670'TO 5261'MD,30 FPM FROM 5261'TO 10141'MD 1-OBTAIN PU/SO WEIGHTS EVERY 10 JOINTS FILL CASING EVERY JOINT WITH FILL UP HOSE -BREAK CIRCULATION EVERY 10 JOINTS AT 5 BPM FOR 15 BBLS FROM SURFACE TO 9-5/8" I 'CASING SHOE -CIRCULATE BOTTOMS UP AT THE 9-5/8" CASING SHOE ' i-CIRCULATE DOWN EVERY FIFTH JOINT(5 BBLS AT 2 BPM)THROUGH THE UGNU(3160' 'TO 4712'MD) I-CIRCULATE DOWN EVERT TENTH JOINT(5 ' BBLS AT 2 BPM)FROM BASE UGNU TO TOP ' HRZ(4712'TO 7309'MD) CIRCULATE CONSECUTIVE JOINTS DOWN ' I I AT 5 BPM TO GET BOTTOMS UP BY THRZ ' , -NO CIRCULATION WHILE RUNNING ' THROUGH HRZ,KLB,KUP,MLVAND KNG ,-MUD WEIGHT IN/OUT=10.5 PPG MUD LOSSES WHILE RUNNING IN THE ' HOLE:43 BBLS ENCOUNTER TIGHT HOLE FROM 9320'TO 9815'MD(TJE AND TJD IN KNG FORMATION) WITH 10K LBS DRAG -PICK UP CASING HANGER AND LANDING JOINT,BREAK CIRCULATION AND ATTEMPT TO WASH FINAL JOINT DOWN.ENCOUNTER COMPLETE PACKOFF AT 10,115'MD. -SHUT DOWN PUMPS AND WORK PIPE DOWN TO 10,133'MD(HANGER 8'ABOVE LANDING RING) -SLOWLY ROLL PUMP AT 1-2 SPM AND PUT I 300 PSI INSIDE CASING,WORK PIPE IN ATTEMPT TO GET PRESSURE TO BLEED OFF AND BREAK PACKOFF -CIRCULATION RE-ESTABLISHED WITH , 10-15K LBS OF TENSION IN STRING AND 1-2 SPM FLOW RATE -STAGE UP PUMPS TO 2.5 BPM AND WORK CASING DOWN,ENCOUNTER ANOTHER PACKOFFAND SHUT DOWN PUMPS -BRING PUMPS BACK ONLINE AND RE-ESTABLISH CIRCULATION,ABLE TO WORK DOWN AND LAND CASING HANGER ON RING -UGNU CLAY AND FINE,GROUND UP SHALES COMING BACK OVER SHAKERS WHILE CIRCULATING(NO SHALE SPLINTERS) Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* 0 North America-ALASKA-BP • Page 35 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay 1 Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 123:30 - 00:00 0.50 CEMT P j INTICIRCULATE TO CONDITION HOLE -STAGE UP PUMPS SLOWLY TO 2.5 BPM,530 PSI AT MIDNIGHT 2/22/2017 100:00 - 07:30 7.50 CEMT P INTI STAGE UP PUMPS IN 1 BPM INCREMENTS TO 4.5 BPM OVER 1 HOUR. CONTINUE TO CIRCULATE HOLE CLEAN AND CONDITION I MUD WITH TOTAL OF 4 BOTTOMS UP. -1 BPM,290 PSI -2 BPM,360 PSI -3 BPM,435 PSI -4 BPM,560 PSI -4.5 BPM,590 PSI ICP,570 PSI FCP ' 1-CONDITION MUD TO 10.5 PPG,18 YP NO LOSSES WHILE CIRCULATING AFTER TWO BOTTOMS UP,PICK UP AND , 'MAKE UP VOLANT PLUG LAUNCHER AND RIG IUP CEMENT HOSE(CIRCULATING PRESSURES GIVEN ABOVE ARE WITH PLUG LAUNCHER RIGGED UP) Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths* 0 North America-ALASKA-BP ill Page 36 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:30 - 11:30 4.00 CEMT P INTI CEMENT 7"INTERMEDIATE LINER AS FOLLOWS: -FILL LINES WITH WATER AND PRESSURE TEST TO 250 PSI LOW AND 4000 PSI HIGH FOR 5 MIN EACH TO LEAKTIGHT CRITERIA (PASSING TESTS) -PUMP 60 BBLS OF 11 PPG MUDPUSH II SPACER AT 5.5 BPM NO BOTTOM PLUG FOR THIS CEMENT JOB DUE TO PRESENCE OF WEATHERFORD ACP AND STAGE COLLAR -PUMP 111 BBLS OF 11.5 PPG LITECRETE LEAD CEMENT AT 5.5 BPM,ICP 740 PSI,FCP 530 PSI -PUMP 24 BBLS OF 15.8 PPG TAIL CEMENT AT 4 BPM '-RELEASE TOP PLUG -SLB KICK OUT PLUG WITH 10 BBLS 8.4 PPG FRESH WATER PERFORM DISPLACEMENT WITH RIG PUMPS AND 10.5 PPG LSND MUD PER SLB CADE '-300 BBLS DISPLACED AT 5 BPM:ICP 370 PSI, FCP 1010 PSI i -60 BBLS DISPLACED AT 4 BPM:ICP 900 PSI, FCP 1260 PSI -REDUCE RATE TO 2 BPM FOR FINAL 15 ' BBLS PRIOR TO PLUG BUMP:FINAL CIRCULATING PRESSURE 1000 PSI(740 PSI , I PREDICTED BY CEMCADE) -BUMP PLUG AT 4055 STROKES(375 BBLS AT 96%PUMP EFFICIENCY)AND INCREASE ! PRESSURE TO 1500 PSI NO LOSSES FROM TIME CEMENT ROUNDED THE SHOE -NO RECIPROCATION THROUGHOUT CEMENT JOB DUE TO RISK OF MOVING SHOE . OUT OF SAG RIVER FORMATION AND ! POTENTIAL OF DAMAGING WEATHERFORD ACP CIPAT 11:05(500 PSI COMPRESSIVE WILL BE REACHED AT 19:27 ON 2/22/17 FOR TAIL AND 06:41 ON 2/23/17 FOR LEAD) -BLEED OFF PRESSURE AND CHECK FLOATS,FLOATS ARE HOLDING 111:30 - 13:00 1.50 CEMT P INTI ATTEMPT TO SET WEATHERFORD ACP PRESSURE UP IN 250 PSI INCREMENTS FROM 1500 PSI TO 2500 PSI -AT 2500 PSI,PRESSURE BLED OFF RAPIDLY TO 1615 PSI.PRESSURE BACK UP TO 2000 PSI AND OBSERVE BLEED OFF TO 1000 PSI ONCE PUMPS WERE SHUT OFF.BLEED OFF I ALL PRESSURE. PRESSURE UP TO 1500 PSI,PRESSURE BLED OFF TO 950 PSI.BLEED OFF ALL PRESSURE. -PRESSURE UP TO 500 PSI,PRESSURE BLED OFF TO 170 PSI OVER 30 MINUTES (PRESSURE HELD STEADY AT 170 PSI) Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* North America-ALASKA-BP S Page 37 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type.DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site.PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 20:30 7.50 CEMT N DFAL 4,832.00 INTI DISCUSS PLAN FORWARD WITH ANCHORAGE TEAM.LEAK POINT BELIEVED TO BE AT OPENING/INFLATION VALVE IN WEATHERFORDACP.DECISION MADE TO WAIT ON 500 PSI COMPRESSIVE STRENGTH FOR TAIL CEMENT TO RULE OUT SHOE TRACK AS LEAK POINT. SIMOPS:CLEAN AROUND RIG,INCLUDING PITS AND TROUGHS.SERVICE HCR AND GREASE AND FUNCTION MANUAL VALVES. 20:30 - 00:00 3.50 CEMT N DFAL 4,832.00 h INTI ATTEMPT TO SHUT WEATHERFORD ACP INFLATION VALVE BY BUILDING 100-200 PSI DIFFERENTIAL PRESSURE ON BACK SIDE PER OCN#6.VALVE MUST BE CLOSED TO RE-ESTABLISH 7"CASING INTEGRITY. FLUID PACK LINES AND CLOSE ANNULAR IPREVENTER -PUMP DOWN 7"CASING AND PRESSURE UP TO 500 PSI.OBSERVE NO PRESSURE RESPONSE ON ANNULUS.BLEED OFF PRESSURE ON 7"CASING,VERIFY NO PRESSURE ON ANNULUS,OPEN ANNULAR PREVENTER. PRESSURE UP TO 500 PSI ON 7"CASING IAND WATCH FOR RETURNS.PRESSURE WAS STABLE FOR 9 MINUTES,AND THEN BEGAN TO BLEED OFF WITH RETURNS SEEN AT SURFACE.PRESSURE STABLIZED AT 275 PSI AND RETURNS STOPPED. -CLOSE ANNULAR PREVENTER AND PRESSURE UP TO 500 PSI ON 7"CASING. PRESSURE BLED OFF TO 275 PSI WITH 0 PSI SEEN ON ANNULUS SIDE.VERIFY NO PRESSURE ON ANNULUS,OPEN ANNULAR PREVENTER. Printed 4/3/2017 9.51:51AM `AII depths reported in Drillers Depths* • North America-ALASKA-BP S Page 38 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/23/2017 00:00 - 04:00 4.00 CEMT N DFAL 4,832.00 INTI CONTINUE TO ATTEMPT TO SHUT WEATHERFORD ACP INFLATION VALVE BY BUILDING 100-200 PSI DIFFERENTIAL PRESSURE ON BACK SIDE PER OCN#6. -PRESSURE UP TO 500 PSI ON 7"CASING AND WATCH FOR RETURNS.PRESSURE BLED OFF,SO PUMPS WERE ROLLED TO MAINTAIN PRESSURE.CLOSE ANNULAR AND CONTINUE TO MAINTAIN 500 PSI INSIDE CASING.ANNULUS PRESSURE SLOWLY BUILT TO 150 PSI,TOTAL OF 4 BBLS PUMPED AWAY INTO FORMATION PER OPERATIONAL LIMITS PROVIDED BY WSUP. -DUMP PRESSURE FROM 7"CASING(2 BBLS !BLED BACK),OBSERVE ANNULUS PRESSURE FALLING FROM 150 PSI TO 110 PSI,AND THEN BUILDING TO 130 PSI AND STABILIZING. BLEED PRESSURE OFF ANNULUS SIDE, SMALL AMOUNT OF RETURNS SEEN AT POSSUM BELLY BUT NO MEASUREABLE VOLUME -OPEN ANNULAR PREVENTER AND PERFORM DIAGNOSTIC PRESSURE TEST 7" CASING TO 500 PSI FOR 15 MIN(PASS) '-BLEED OFF PRESSURE AND REPEAT TEST (PASS) -DISCUSS PLAN FORWARD WITH ANCHORAGE TEAM.IT APPEARED THAT ACP VALVE HAD CLOSED,SO DECISION WAS MADE TO PRESSURE UP TO 3500 PSI IN ATTEMPT TO OPEN STAGE COLLAR. PRESSURE UP TO 1200 PSI,PRESSURE BLED OFF RAPIDLY TO 300 PSI -SHUT ANNULAR PREVENTER WITH 300 PSI REMAINING ON 7"CASING.PRESSURE UP TO 200 PSI ON ANNULUS,THEN DUMP CASING SIDE PRESSURE.OA PRESSURE BLED DOWN TO 100 PSI.PUMP DOWN OA TO INCREASE AND MAINTAIN PRESSURE AT 200 PSI FOR 2 MINUTES. -BLEED OFF PRESSURE AND REPEAT 7" CASING TEST TO 1200 PSI,SAME RESULT AS FIRST TEST PREVIOUS BELIEF THAT ACP INFLATION VALVE HAD CLOSED WAS NOT CORRECT 04:00 - 04:30 0.50 CEMT N DFAL 4,832 00 INTI DISCUSS RESULTS OF PRESSURE TESTING WITH ANCHORAGE TEAM.DECISION MADE TO RIG UP E-LINE TO PERFORM LEAK-DETECT LOG TO CONFIRM LEAK POINT IS ACP(OTHER POTENTIAL LEAK POINT IS CASING SHOE). 04:30 - 06:30 2.00 CEMT N DFAL 4,832.00 INTI RIG DOWN CEMENTING EQUIPMENT IN PREPERATION FOR LEAK-DETECT LOG ON E-LINE -BLOW DOWN SURFACE LINES AND EQUIPMENT -BREAK OUT AND LAY DOWN VOLANT PLUG LAUNCHER -CLEAN AND CLEAR RIG FLOOR 106:30 - 10:30 4.00 CEMT N DFAL 4,832 00 INTI WAIT ON E-LINE Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP Page 39 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 12:00 1.50 EVAL N DFAL 4,832.00 INTI RIG UP E-LINE FOR LEAK-DETECT LOG -MAKE UP SIDE ENTRY PUMP-IN SUB AND FOSV TO CROSSOVERS -E-LINE RIGGED UP WITH INTEGRAL LINE CUTTER AND PACKOFF 12:00 - 21:30 9.50 EVAL N DFAL 4,832.00 INTI PERFORM LEAK-DETECT LOG ON E-LINE -RUN IN HOLE WITH LOGGING TOOL STRING TO 4930'MD(54'MD BELOW BOTTOM OF ACP) I-PICK UP AND ENCOUNTER OVERPULLAT ,14855'MD(DEPTH PUTS E-LINE HEAD AT ABRUPT LEDGE INSIDE STAGE TOOL).MAKE SEVERAL ATTEMPTS TO PULL THROUGH STAGE TOOL WITH NO PROGRESS. '-PRESSURE UP TO 1500 PSI ON CASING AND ESTABLISH INJECTION RATE.LOG FROM 4930'TO 4855'MD. -LOG CONFIRMED LEAK-POINT IS AT THE TOP OF THE ACP(LOCATION OF INFLATION VALVE) -DUMP PRESSURE,PRESSURE BACK UP TO 1500 PSI AND MAKE REPEAT PASS ACROSS SAME INTERVAL WITH SAME RESULT -DUMP PRESSURE,PRESSURE BACK UP TO 1500 PSI AND OBSERVE PRESSURE HOLDING STEADY -LEAK-DETECT LOG INDICATES LEAK HAS STOPPED -PERFORM DIAGNOSTIC PRESSURE TEST TO 2500 PSI THREE TIMES AS FOLLOWS: PRESSURE UP TO 2500 PSI,SHUT OFF PUMP AND ISOLATE,RECORD PRESSURE FOR AT LEAST 10 MINUTES,DUMP PRESSURE -IN EACH CASE,LEAK-DETECT LOG SIGNATURE WAS IDENTICAL(MINOR NOISE ONLY,INDICATING THERE WAS NO LEAK). APPROXIMATELY 5 PSI LOST IN 10 MIN FOR ALL TESTS. -PRESSURE UP TO 1500 PSI INSIDE 7" CASING AND 200 PSI ON ANNULUS.DUMP PRESSURE INSIDE CASING.REPEAT THIS CYCLE ONCE MORE. -REPEATABILITY OF PRESSURE TESTS INDICATES THAT ACP INFLATION VALVE HAS BEEN CLOSED AND CASING INTEGRITY RE-ESTABLISHED. 21:30 - 22:30 1.00 EVAL N DFAL 4,832.00 INTI RIG UP AND PERFORM CASING INTEGRITY TEST TO 250 PSI LOW FOR 5 MIN/2400 PSI HIGH FOR 45 MIN(PASS) 8 PSI LOST IN FIRST 15 MIN,6 PSI LOST IN SECOND 15 MIN,4 PSI LOST IN THIRD 15 MIN -PASSING TEST CHARTED AND APPROVED BY WSUP(SEE ATTACHED PRESSURE TEST CHART AND CALCULATOR) 22:30 - 23:30 1.00 EVAL N DFAL 4,832.00 INTI WORK E-LINE IN ATTEMPT TO GET PAST LEDGE ON STAGE TOOL,ABLE TO GET FREE BY VARYING PICKUP SPEED 23:30 - 00:00 0.50 EVAL N DFAL 4,832.00 INTI PULL OUT OF HOLE WITH E-LINE 2/24/2017 00:00 - 00:30 0.50 EVAL N DFAL 4,832.00 INTI CONTINUE PULLING OUT OF HOLE WITH E-LINE 00:30 - 02:00 1.50 EVAL N DFAL 4,832.00 INTI RIG DOWN E-LINE EQUIPMENT Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths* North America-ALASKA-BP Page 40 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 02:30 0.50 CEMT P INTI OPEN STAGE TOOL PER WEATHERFORD REPRESENTATIVE -PRESSURE UP TO 2500 PSI AT 10 SPM, THEN INCREASE RATE TO 30 SPM AND PRESSURE UP TO 3950 PSI.NO INDICATION OF SHEAR,HOLD PRESSURE FOR 1 MINUTE SAND BLEED OFF. -PRESSURE UP TO 2500 PSI AT 20 SPM, THEN INCREASE RATE TO 30 SPM AND PRESSURE UP TO 3950 PSI.CLEAR INDICATION OF SHEAR AND PRESSURE BLED OFF RAPIDLY. 02:30 - 07:30 5.00 CEMT P INTI I CIRCULATE THROUGH STAGE TOOL TO CONDITION MUD PRIOR TO SECOND STAGE INTERMEDIATE CEMENT JOB:STAGE UP PUMPS IN 0.5 BPM INCREMENTS TO 4 BPM OVER 5 HOURS -1 BPM,390 PSI -2 BPM,390 PSI -3 BPM,390 PSI -4 BPM,390 PSI !-MAINTAIN CIRCULATING PRESSURE BELOW 400 PSI(MW 10.5 PPG)/520 PSI(MW 10.0 PPG)PER OCN#8 -CONDITION MUD TO 10.0 PPG,18 YP(MUD WEIGHT REDUCED IN ORDER TO LIMIT PRESSURE ON SCHRADER FORMATION DURING CEMENT JOB) NO LOSSES WHILE CIRCULATING SIGNIFICANT INCREASE IN CUTTINGS SEEN AT SHAKERS 07:30 - 08:00 0.50 CEMT P INTI PICKUP AND MAKE UP VOLANT PLUG LAUNCHER TO STUMP 08:00 - 13:00 5.00 CEMT N DFAL 4,832.00 INTI CIRCULATE THROUGH STAGE TOOL TO CONDITION MUD PRIOR TO SECOND STAGE INTERMEDIATE CEMENT JOB -5 BPM,ICP 480 PSI,FCP 430 PSI MAINTAIN CIRCULATING PRESSURE BELOW 400 PSI(MW 10.5 PPG)/520 PSI(MW 10.0 PPG)PER OCN#8 -CONDITION MUD TO 10.0 PPG,18 YP(MUD WEIGHT REDUCED IN ORDER TO LIMIT PRESSURE ON SCHRADER FORMATION DURING CEMENT JOB) -NO LOSSES WHILE CIRCULATING Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP S Page 41 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations _ (hr) (usft) 13:00 - 14:30 1.50 CEMT P INTI 'PUMP 7"INTERMEDIATE SECOND STAGE CEMENT JOB THROUGH STAGE TOOL AS FOLLOWS: -FILL LINES WITH WATER AND PRESSURE TEST TO 250 PSI LOW AND 4000 PSI HIGH FOR 5 MIN EACH TO LEAKTIGHT CRITERIA (PASSING TESTS) -PUMP 30 BBLS OF 11 PPG MUDPUSH II SPACER AT 5 BPM,411 PSI -NO BOTTOM PLUG FOR THIS CEMENT JOB -PUMP 34 BBLS OF 11.5 PPG LITECRETE LEAD CEMENT AT 5 BPM,ICP 660 PSI,FCP 800 PSI -RELEASE TOP PLUG -SLB KICK OUT PLUG WITH 10 BBLS 11.0 PPG MUDPUSH -PERFORM DISPLACEMENT WITH RIG PUMPS AND 10.0 PPG LSND MUD PER SLB CADE -123 BBLS DISPLACED AT 4 BPM:ICP 230 PSI, FCP 520 PSI -REDUCE RATE TO 3.5 BPM FOR FINAL 52 BBLS PRIOR TO PLUG BUMP:FINAL CIRCULATING PRESSURE 840 PSI -BUMP PLUG AT 1890 STROKES(175 BBLS AT 96%PUMP EFFICIENCY)AND INCREASE PRESSURE TO 2500 PSI -4 BBLS LOST FROM TIME CEMENT ROUNDED THE SHOE TO CIP -CIP AT 14:00(50 PSI COMPRESSIVE WILL BE REACHED AT 03:33 ON 2/25/17 AND 200 PSI COMPRESSIVE WILL BE REACHED AT 08:00 ON 2/25/17) BLEED OFF PRESSURE AND MONITOR WELL,STATIC -REFER TO USIT CEMENT EVALUATION LOG RUN ON 3/17 FOR DETAILS ON SECOND STAGE CEMENT QUALITY 14:30 - 16:00 1.50 CEMT P INTI I RIG DOWN CEMENTING EQUIPMENT AND DOYON CASING -RIG DOWN VOLANT PLUG LAUNCHER, VOLANT TOOL AND CEMENT LINE BLOW DOWN LINES -REMOVE BAIL EXTENSIONS,LAY DOWN LANDING JOING AND RIG DOWN POWER TONGS 16:00 - 17:00 1.00 CEMT P INTI ESTABLISH INJECTIVITY DOWN OUTER ANNULUS WITH 10.0 PPG LSND -HIGHER THAN EXPECTED LIFT PRESSURES INDICATED THAT THERE WAS A RISK THAT CEMENT HAD BEEN BROUGHT INTO 9-5/8" CASING SHOE.BECAUSE OF THIS,DECISION WAS MADE TO ESTABLISH INJECTIVITY IMMEDIATELY. -FLUID PACK LINES AND CLOSE BLIND/SHEAR RAMS -COME ONLINE WITH PUMPS AND PRESSURE UP AT 0.5 BPM.BREAKOVER OCCURED AT 905 PSI.INJECT 2 BBLS AFTER BREAKOVER. Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP 5 Page 42 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 19:30 2.50 CEMT P INTI RUN AND TEST 7"PACKOFF TO 250 PSI LOW (5 MIN)/5000 PSI HIGH(15 MIN)PER FMC REPRESENTATIVE -TEST MET CRITERIA PER BP PRACTICE 100222:LOW PRESSURE TEST DECLINE OF LESS THAN 10 PSI/MIN,HIGH PRESSURE TEST DECLINE OF LESS THAN 5 PSI/MIN --TEST APPROVED BY WSUP 19:30 - 00:00 4.50 BOPSUR P INTI PRESSURE TEST BOPE TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH FOLLOWING AOGCC REGULATIONS AND BP STANDARDS -AOGCC REP CHUCK SCHEIVE WAIVED WITNESS TEST WITH 2-7/8"AND 4-1/2"TEST JOINTS -TEST ALARMS,PVT AND FLOW SHOW -ALL TESTS PASS,SEE ATTACHED TEST CHARTS SIMOPS:PERFORM INJECTIVITY DOWN OUTER ANNULUS WITH 10.0 PPG LSND -INJECT THREE TIMES AT 20:00,21:00 AND 22:00 --PUMP AT 0.5 BPM.BREAKOVER OCCURED AT 275 PSI FOR ALL TESTS.INJECT 1 BBL AFTER BREAKOVER FOR ALL TESTS. 2/25/2017 00:00 - 02:30 2.50 BOPSUR P INTI CONTINUE PRESSURE TESTING BOPE TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH FOLLOWING AOGCC REGULATIONS AND BP STANDARDS -AOGCC REP CHUCK SCHEIVE WAIVED WITNESS -TEST WITH 2-7/8"AND 4-1/2"TEST JOINTS -TEST ALARMS,PVT AND FLOW SHOW ALL TESTS PASS,SEE ATTACHED TEST CHARTS SIMOPS:PERFORM INJECTIVITY DOWN OUTER ANNULUS WITH 10.0 PPG LSND INJECT ONE TIME AT 02:00 -PUMP AT 0.5 BPM.BREAKOVER OCCURED AT 275 PSI,INJECT 1 BBL AFTER BREAKOVER. 02:30 - 04:00 1.50 CEMT P INTI MAKE UP 6-1/8"DUMB IRON CLEANOUT BHA FROM SURFACE TO 568'MD -MONITOR WELL VIA TRIP TANK WHILE RUNNING IN HOLE 04:00 - 04:30 0.50 CEMT P INTI RUN IN HOLE WITH 6-1/8"DUMB IRON CLEANOUT ASSEMBLY FROM 568'TO 1985' MD ON ELEVATORS -MONITOR WELL VIA TRIP TANK WHILE RUNNING IN HOLE -MW 10.0 PPG IN/OUT 04:30 - 05:30 1.00 CEMT P INTI FREEZE PROTECT OUTER ANNULUS WITH 51 BBLS 9.8 PPG BRINE AND 5 BBLS DIESEL -INITIATE INJECTION AT 0.5 BPM, BREAKOVER SEEN AT 960 PSI WITH STEADY INJECTION PRESSURE OF 550 PSI -SLOWLY STAGE UP RATE TO 2 BPM,900 PSI ALLOWING PRESSURE TO STABILIZE AT EACH 0.5 BPM INCREMENT Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths` • North America-ALASKA-BP • Page 43 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 07:00 1.50 CEMT P INTI RUN IN HOLE WITH 6-1/8"DUMB IRON CLEANOUT ASSEMBLY FROM 1985'TO 4728' MD ON ELEVATORS -MONITOR WELL VIA TRIP TANK WHILE 'RUNNING IN HOLE ' -MW 10.0 PPG IN/OUT 07:00 08:00 1.00 CEMT PINTI I DRILL OUT WEATHERFORD STAGE TOOL I-WASH DOWN AT 2 BPM,220 PSI FROM 4728' MD AND TAG CEMENT AT 4834'MD -60 RPM,4K FT-LBS TORQUE,250 GPM,350 PSI,2-5K LBS WOB PLUG DRILLED VERY QUICKLY WITH ' !MINIMAL WOB 08:00 - 09:00 1.00 CEMT P INTI CIRCULATE HI-VIS SWEEP SURFACE TO ,SURFACE ' -400 GPM,1660 PSI -MINIMAL RUBBER SEEN OVER SHAKERS 09:00 - 13:00 4.00 CEMT P INTI RUN IN HOLE WITH 6-1/8"DUMB IRON CLEANOUT ASSEMBLY FROM 4734'TO 8990' MD ON ELEVATORS -MONITOR WELL VIA TRIP TANK WHILE RUNNING IN HOLE -MW 10.0 PPG IN/OUT -ENCOUNTER INTERMITTENT 5-10K LBS DRAG WHILE RUNNING IN HOLE ' -CIRCULATE BOTTOMS UP AT AT 6800'MD IN ATTEMPT TO ALLEVIATE DRAG.DRAG IMPROVED FOR 3-4 STANDS BUT THEN !RETURNED. -AT 8890'MD,DISCREPANCY NOTICED ON TRIP SHEET.WSL WAS NOTIFIED AND PERFORMED 10 MIN FLOW CHECK.WELL ' STATIC. I -RUN IN HOLE ONE MORE STAND,AND NOTICE ANOTHER TRIP SHEET 1 DISCREPANCY.PERFORM ANOTHER FLOW ' I CHECK-WELL FLOWING. -SPACE OUT,STAB FULL OPENING SAFETY VALVE AND SECURE WELL WITH ANNULAR PREVENTER -BEGIN RECORDING DRILL PIPE AND CASING PRESSURES FROM REMOTE CHOKE -TOTAL OF 5 BBLS GAINED,SIDPP=0 PSI, SICP=0 PSI -MAKE TIER 3 NOTIFICATIONS AND NOTIFY CENTRAL WELL CONTROL TEAM Printed 4/3/2017 9:51:51AM `AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 44 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 19:00 6.00 CEMT N FLUD 8,990.00 INTI CIRCULATE WELL USING DRILLERS METHOD FILL MUD GAS SEPERATOR OFFLINE WHILE MONITORING PRESSURES(13 BBLS TO FILL) -OBTAIN APPROVAL TO FILL DRILL PIPE AND OPEN FLOAT -SCREW INTO STUMP WITH TOP DRIVE AND FILL PIPE,OPEN FLOAT WITH 700 PSI (HIGHER THAN ANTICIPATED) : -SHUT DOWN PUMPS,SIDPP=235 PSI,SICP =0 PSI MONITOR PRESSURES FOR 10 MIN,SIDPP= 235 PSI,SICP=30 PSI I-DISCUSS PLAN FORWARD WITH ANCHORAGE TEAM,RECEIVE APPROVAL TO CIRCULATE WELL OUT WITH DRILLERS METHOD HOLDING 100 PSI CASING PRESSURE i DRILLERS METHOD FIRST CIRCULATION -BRING PUMPS UP SLOWLY TO KILL RATE OF i 26 SPM HOLDING SICP=100 PSI -ICP=637 PSI -DPP=600-760 PSI,CP=96-110 PSI THROUGHOUT CIRCULATION(70-200 PSI I OVERBALANCE ON WELL) -SHUT DOWN PUMPS AND SHUT IN WELL IN CONTROLLED MANNER,FINAL SIDPP=235 PSI,SICP=100 PSI -TOTAL OF 250 BBLS PUMPED(1 BOTTOMS UP+45 BBLS) -ZERO BBLS LOST/GAINED THROUGHOUT ' CIRCULATION -NO HYDROCARBONS OBSERVED , i THROUGHOUT CIRCULATION -OA PRESSURE 460 PSI THROUGHOUT CIRCULATION ' -CONTINUE MONITORING PRESSURES FROM 16:20 TO 19:00,DRILL PIPE PRESSURE REMAINED CONSTANT AT 235 PSI,CASING PRESSURE INCREASED TO 230 PSI Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths" • North America-ALASKA-BP • Page 45 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-0S ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 21:30 2.50 CEMT N FLUD 8,990.00 INT1 PERFORM DIAGNOSTIC PRESSURE TEST OF 17"CASING TO 3500 PSI HIGH FOR 45 MIN PER I OCN#12 I DISCUSS RESULTS OF CIRCULATION WITH ANCHORAGE AND CENTRAL WELL CONTROL TEAM -LINE UP DOWN DRILL PIPE AND KILL LINE '-INCREASE PRESSURE IN 250 PSI INCREMENTS,HOLDING EACH INCREMENT j FOR 5 MIN(ALL PASS) , INCREASE PRESSURE TO FINAL TEST PRESSURE OF 3500 PSI AND HOLD FOR 45 MIN(PASS) j -30 PSI LOST IN FIRST 15 MIN,10 PSI LOST IN SECOND 15 MIN,5 PSI LOST IN FINAL 15 MIN -4.35 BBLS TO PRESSURE UP,4.2 BBLS BLED j !BACK BLEED PRESSURE DOWN TO 377 PSI TO PROVIDE MINIMUM OF 100 PSI SAFETY j 1 FACTOR OVER 230 SICP PRIOR TO PRESSURE TESTING -OA PRESSURE 330 PSI THROUGHOUT CIRCULATION I 1-TEST REVIEWED BY WSUPAND DEEMED i ACCEPTABLE HIGH TEST.TEST WILL BE I REPEATED WITH PROPER LOW TEST ONCE ! ON BOTTOM. SEE ATTACHED CHART AND CALCULATOR 21:30 - 00:00 ' 2.50 i CEMT N FLUD 8,990.00 1 INTI MONITOR WELLAND RECORD CASING AND DRILL PIPE PRESSURE EVERY 5 MIN 1 I-CASING PRESSURE INCREASED FROM 377 TO 413 PSI,DRILL PIPE PRESSURE INCREASED FROM 360 PSI TO 382 PSI IN 2.5 HOURS i DISCUSS RESULTS OF CASING TEST WITH ANCHORAGE.DUE TO PASSING TEST ALONG WITH POOR UNDERSTANDING OF FLUID DENSITIES IN WELLBORE,CAUSE OF PRESSURE DISCREPANCIES BELIEVED TO I BE OUT OF BALANCE MUD.SURFACE VOLUME OF MUD IS SMALL RELATIVE TO WELLBORE VOLUME(100 BBLS ON SURFACE, 300 BBLS IN WELLBORE)SO IT WILL BE VERY CHALLENGING TO OBTAIN CONSISTENT FLUID PROPERTIES IN THE WELL.DECISION MADE TO ORDER 350 BBLS NEW 10.3 PPG LSND.WHILE WAITING ON FLUID, AGREEMENT MADE TO CIRCULATION WITH CURRENT MUD TO ENSURE LINES DO NOT FREEZE. 2/26/2017 00:00 - 01:00 1.00 CEMT , N FLUD 8,990.00 INTI MONITOR WELLAND RECORD CASING AND DRILL PIPE PRESSURE EVERY 5 MIN -CASING PRESSURE INCREASED FROM 413 TO 419 PSI,DRILL PIPE PRESSURE ,INCREASED FROM 382 PSI TO 387 PSI IN 1 HOUR Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP Page 46 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 06:00 5.00 CEMT N FLUD 8,990.00 INTI CIRCULATE THROUGH CHOKE AND MUD GAS SEPERATOR WHILE WAITING ON NEW MUD -2 BPM,DPP=1000 PSI,CP=495 PSI -CIRCULATE TO ENSURE LINES DO NOT FREEZE -AFTER 4 HOURS OF CIRCULATING,MW 10.1 PPG IN/OUT 06:00 - 08:00 2.00 CEMT N FLUD 8,990.00 INTI `PERFORM EXHALE TEST DISCUSS CIRCULATION WITH WSUP AND WOM AND RECEIVE APPROVAL TO PERFORM EXHALE TEST(BOUNDARY CONDITION: MAXIMUM OF 5 BBLS BLED BACK) -OPEN CHOKE,BLEED DRILL PIPE/CASING PRESSURE TO 0/0 PSI,0.4 BBLS BLED BACK -MONITOR WELL THROUGH OPEN CHOKE FOR 30 MIN,STATIC -DISCUSS RESULTS OF EXHALE TEST WITH WSUP AND WOM AND RECEIVE APPROVAL TO OPEN ANNULAR PREVENTER -OPEN WELL AND MONITOR FOR 30 MIN, STATIC 08:00 - 09:00 1.00 CEMT N FLUD 8,990.00 INTI CIRCULATE AND CONDITION MUD -2 BPM,700 PSI,120 RPM,8K FT-LBS I TORQUE 09:00 - 10:00 1.00 CEMT P INTI RUN IN HOLE WITH 6-1/8"DUMB IRON CLEANOUT ASSEMBLY FROM 8981'TO 10,020' MD ON ELEVATORS -MONITOR WELL VIA TRIP TANK WHILE RUNNING IN HOLE MW 10.1 PPG IN/OUT 10:00 - 11:00 1.00 CEMT P 1 INTI CIRCULATE AND CONDITION MUD -3 BPM,780 PSI,120 RPM,10K FT-LBS TORQUE 11:00 - 13:00 2.00 CEMT N FLUD 8,990.00 INTI DISPLACE TO NEW 10.3 PPG LSND -4 BPM,800 PSI,120 RPM,10K FT-LBS TORQUE -RECIPROCATE FULL STAND WHILE DISPLACING -PERFORM 10 MIN FLOW CHECK AFTER DISPLACEMENT,STATIC Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* North America-ALASKA-BP S Page 47 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM Rig Release.3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 19:30 6.50 CEMT N FLUD 8,990.00 INTI ATTEMPT TO PRESSURE TEST 7"CASING TO 250 PSI LOW(5 MIN)/3500 PSI HIGH(30 MIN) -FIRST TEST SHOWED 30 PSI LOST IN FIRST 15 MIN,30 PSI GAINED IN SECOND 15 MIN(4.4 BBL TO PRESSURE UP,4.4 BBL BLED BACK). TEST NOT ACCEPTED DUE TO PRESSURE GAIN. 1 FAILURE BELIEVED TO BE FROM THERMAL EFFECTS ON COLD MUD IN WELLBORE -CIRCULATE AND CONDITION MUD IN ATTEMPT TO WARM UP:300 GPM,1130 PSI, 100 RPM,10K FT-LBS TORQUE -MONITOR WELL FOR 10 MIN AFTER CIRCULATION,STATIC -SECOND TEST SHOWED 20 PSI GAINED IN FIRST 15 MIN,30 PSI GAINED IN SECOND 15 MIN(4.5 BBL TO PRESSURE UP,4.5 BBL BLED BACK).TEST NOT ACCEPTED DUE TO PRESSURE GAIN. CIRCULATE AND CONDITION MUD IN ATTEMPT TO WARM UP:400-450 GPM, 1700-2000 PSI,100 RPM,10K FT-LBS TORQUE, 'FINAL MUD TEMP=94°F 19:30 - 21:30 2.00 CEMT P INTI PRESSURE TEST 7"INTERMEDIATE CASING TO 250 PSI LOW(5 MIN)/3500 PSI HIGH(30 MIN),TEST PASSED 60 PSI LOST IN FIRST 15 MIN,10 PSI LOST IN SECOND 15 MIN -6.7 BBLS TO PRESSURE UP,6.6 BBLS BLED BACK TEST APPROVED BY WSUP -SEE ATTACHED CHART AND CALCULATOR 21:30 - 00:00 2.50 CEMT P INTI DRILL OUT SHOE TRACK AND PLUGS FROM 10,040'TO 10,051'MD -TAG DEBRIS AND CEMENT AT 10,040'MD AND BEGIN TO DRILL -250 GPM,930-940 PSI,80 RPM,10 KFT-LBS TORQUE,8 KLBS WOB,ROP LESS THAN 1 FPH -RUBBER SEEN COMING OVER SHAKERS AT BOTTOMS UP -AFTER 30 MIN OF DRILLING WOB DECREASED TO 5K LBS AND ROP INCREASED TO 30-40 FPH -TAG PLUG AND LANDING COLLAR AT 10,051' MD -DRILL AT 10,051'MD WITH 250 GPM,930-950 PSI,80 RPM,10K FT-LBS TORQUE,4-6K WOB, ROP LESS THAN 1 FPH -RUBBER,METAL SHAVINGS AND CEMENT SEEN ON BOTTOMS UP FROM TAG AT 10,051' MD Printed 4/3/2017 9:51:51AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 48 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB(897.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/27/2017 00:00 02:30 2.50 CEMT P INTI CONTINUE DRILLING OUT SHOE TRACK AND PLUGS FROM 10,051'TO 10,131'MD -250 GPM,930-950 PSI,80 RPM,10 KFT-LBS TORQUE,8-15 KLBS WOB,ROP LESS THAN 1 FPH -AFTER 3 HOURS OF DRILLING FROM TAG AT 10,051'MD,OBSERVED RAPID DROP IN WOB AND INCREASE IN ROP -250 GPM,940-960 PSI,80 RPM,10K FT-LBS TORQUE,<1K LB WOB,ROP 80-250 FPH -DRILL ALL BUT 10'OF SHOE TRACK TO 10,131'MD -HOLE UNLOADED HARD,UNCONSOLIDATED CEMENT AT BOTTOMS UP FROM WOB DROPOFFAND THEN CLEANED UP 02:30 - 04:00 1.50 CEMT P INTI CIRCULATE HI-VIS SWEEP SURFACE TO SURFACE -250 GPM,ICP 1050 PSI,FCP 950 PSI,100 RPM,10K FT-LBS TORQUE -NO SIGNIFICANT CUTTINGS RETURNS NOTED WHEN SWEEP RETURNED TO SURFACE 04:00 - 05:30 1.50 CEMT P INTI DISPLACE WELL FROM 10.3 PPG LSND TO NEW 8.6 PPG QUICKDRIL-N MUD -MONITOR BBL IN VS BBL OUT AND OBSERVE NO DISCREPANCIES OUTSIDE+/-5 BBLS -FOLLOW PRESSURE SCHEDULE PER BAROID TAKE SPRS AFTER DISPLACING FLUID,10131' MD,MW 8.6 PPG -MP1:30/40 SPM 375/465 PSI -MP2:30/40 SPM 370/465 PSI 05:30 - 07:00 1.50 CEMT P INTI CIRCULATE 1 BOTTOMS UP TO CONDITION MUD AFTER DISPLACEMENT -250 GPM,780 PSI -PERFORM 30 MIN FLOW CHECK,STATIC 07:00 - 07:30 0.50 CEMT P INTI ATTEMPT PERFORM ASSURANCE PRESSURE TEST ON 7"CASING AND REMAINDER OF CEMENT IN SHOE TRACK TO 250 PSI LOW(5 MIN)/3500 PSI HIGH(5 MIN),TEST FAILED -PER OCN#10,FIT WILL BE PERFORMED WITH CURRENT BHA DUE TO FAILURE OF ASSURANCE TEST 07:30 - 08:30 1.00 CEMT P INTI CIRCULATE BOTTOMS UP PRIOR TO DRILLING REMAINDER OF SHOE TRACK -300 GPM,1350 PSI 08:30 - 10:00 1.50 CEMT P INTI DRILL OUT REMAINDER OF SHOE TRACK AND 20'OF NEW FORMATION FROM 10,131'TO 10,165'MD -250-300 GPM,750-950 PSI,80-100 RPM, 9-10K FT-LBS TORQUE,5-12K LBS WOB -INSTANTANEOUS ROP=20-40 FPH 10:00 - 11:00 1.00 CEMT P INTI CIRCULATE BOTTOMS UP PRIOR TO PERFORMING FIT -300 GPM,950 PSI MW IN/OUT 8.6 PPG Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 49 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:00 1.00 CEMT P INTI PERFORM FIT TO 10.0 PPG EMW -8724'TVD 8.6 PPG MW,634 PSI SURFACE PRESSURE -DISCUSS RESULTS WITH ODE AND RECEIVE APPROVAL TO PROCEED 12:00 - 19:00 7.00 CLEAN P PROD1 PUMP OUT OF HOLE WITH 6-1/8"CLEANOUT ASSEMBLY AT 2 BPM FROM 10,165'TO 4000' IMD -PUMPING OUT OF HOLE TO AVOID SWABBING FROM 8.3 PPG SAG RIVER -TRIPPING SPEEDS:80 FPM FROM 10,165'TO 6000'MD,90 FPM FROM 6000'TO 5000'MD, 100 FPM FROM 5000'TO 4000'MD -PUMP AT 2 BPM 19:00 - 20:30 1.50 CLEAN P PROD1 PULL OUT OF HOLE WITH 6-1/8"CLEANOUT ASSEMBLY FROM 4000'TO SURFACE ON ELEVATORS -TRIPPING SPEEDS:50 FPM FROM 4000'TO 3000'MD,140 FPM FROM 3000'MD TO SURFACE -MONITOR WELL VIA TRIP TANK,GOOD DISPLACEMENT 20:30 - 22:00 1.50 CLEAN P PROD1 LAY DOWN 6-1/8"CLEANOUT ASSEMBLY PER ,BAKER REPRESENTATIVE -LAY DOWN 4-3/4"COLLARS TO PIPE SHED -CLEAN AND CLEAR RIG FLOOR 22:00 - 00:00 2.00 BOPSUR N FLUD 8,990.00 PROD1 TEST ANNULAR PREVENTER WITH 2-7/8" TEST JOINT TO 250 PSI LOW/3500 PSI HIGH FOR 5 MIN EACH(PASS) 2/28/2017 00:00 - 02:00 2.00 DRILL P PROW MAKE UP 6-1/8"MOTOR DRILLING BHA FROM SURFACE TO 172'MD 1-6-1/8"SMITH WR-20 TRI-CONE INSERT BIT, BAKER X-TREME LS MOTOR(2.V°BEND)AND NAVIGAMMA -SHALLOW HOLE TEST TOOLS AT 172'MD (PASS) 02:00 - 05:00 3.00 DRILL P PROD1 RUN IN HOLE WITH 6-1/8"MOTOR DRILLING ASSEMBLY FROM 172'TO 5084'MD ON ELEVATORS -FILL PIPE EVERY 20 STANDS -MONITOR WELL VIA TRIP TANK,GOOD DISPLACEMENT -NO ISSUES PASSING THROUGH STAGE I COLLAR AT 4832'MD -MW 8.6 PPG IN/OUT 05:00 - 06:00 1.00 DRILL P PROD1 SLIP AND CUT 64'OF DRILLING LINE AND CALIBRATE BLOCKS 06:00 - 08:30 2.50 DRILL P PROD1 RUN IN HOLE WITH 6-1/8"MOTOR DRILLING ASSEMBLY FROM 5084'TO 10165'MD ON ELEVATORS -FILL PIPE EVERY 20 STANDS -MONITOR WELL VIA TRIP TANK,GOOD DISPLACEMENT -MW 8.6 PPG IN/OUT Printed 4/3/2017 9:51:51AM •AII depths reported in Drillers Depths* • North America-ALASKA-BP Page 50 of 76 Operation Summary Report Common Well Name V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 12:00 3.50 DRILL P PROD1 DIRECTIONAL DRILL6-1/8"PROD HOLE FROM 10165 MD TO 10208'MD INSAG RIVER AND SHUBLIK FORMATION(43'IN 3.5 HRS=12.3 FPH WITH CONNECTIONS) -8-25 FPH INSTANTANEOUS ROP -270 GPM,1450-1700 PSI,40 RPM ROTATING, 9-10/8-9 KFT-LBS TRQ ON/OFF BTM,5-15 KLBS WOB -MW IN/OUT=8.6 PPG -NO LOSSES WHILE DRILLING AHEAD -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS SLOW CIRCULATION RATES,10143'MD,8.6 PPG MW: MP#1: 30 SPM-502 PSI,40 SPM-670 PSI MP#2: 30 SPM 505 PSI,40 SPM-730 PSI 12:00 - 18:00 6.00 DRILL P PROD1 1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 10208'MD TO 10311'MD IN SHUBLIK 1 FORMATION(103'IN 6 HRS=17.2 FPH WITH CONNECTIONS) 10-30 FPH INSTANTANEOUS ROP 270 GPM,1550-1700 PSI,40 RPM ROTATING, 9-11/8-9 KFT-LBS TRQ ON/OFF BTM,7-15 KLBS WOB -MW IN/OUT=8.6 PPG -NO LOSSES WHILE DRILLING AHEAD -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD 1-NO BACKREAMING AT CONNECTIONS 18:00 - 00.00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 10311'MD TO 10468'MD IN SHUBLIKAND TSAD FORMATIONS(266'IN 6 HRS=26.2 FPH WITH CONNECTIONS) -20-40 FPH INSTANTANEOUS ROP THROUGH SHUBLIK AND 40-100 FPH INSTANTANEOUS ROP THROUGH IVISHAK -270 GPM,1550-1800 PSI,40 RPM ROTATING, 9-11/8-9 KFT-LBS TRQ ON/OFF BTM,10-25 KLBS WOB 1-MW IN/OUT=8.6 PPG -NO LOSSES WHILE DRILLING AHEAD -SURVEY EVERY JOINT(-30')FOR PLANNED 1 DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS TOTAL DRILLING TIME FOR PAST 24 HOUR REPORTING PERIOD=8 HRS(52%) SLOW CIRCULATION RATES,10468'MD,8.6 PPG MW: MP#1: 30 SPM-650 PSI,40 SPM-770 PSI MP#2: 30 SPM-575 PSI,40 SPM-640 PSI Printed 4/3/2017 9.51.51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP Page 51 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/1/2017 00:00 - 06:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 10468'MD TO 10620'MD IN IVISHAK FORMATION(152'IN 6 HRS=25.3 FPH WITH CONNECTIONS) -40-90 FPH INSTANTANEOUS ROP -300 GPM,1700-1950 PSI,40 RPM ROTATING, 9-12/9-10 KFT-LBS TRQ ON/OFF BTM,5-25 KLBS WOB -MW IN/OUT=8.6 PPG -NO LOSSES WHILE DRILLING AHEAD -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS 06:00 - 12:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 10,620'MD TO 10,815'MD,9,021'TVD IN IVISHAK FORMATION(195'IN 6 HRS=32.5 FPH WITH CONNECTIONS) -40-90 FPH INSTANTANEOUS ROP -300 GPM,1850-1920 PSI,40 RPM ROTATING, 9-12/9-10 KFT-LBS TRQ ON/OFF BTM,5-25 KLBS WOB -PU-195K,SOW-135K,ROT-160K -MW IN/OUT=8.6 PPG NO LOSSES WHILE DRILLING AHEAD -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS SLOW CIRCULATION RATES,10,751'MD,8.6 PPG MW: MP#1: 30 SPM-610 PSI,40 SPM-790 PSI MP#2: 30 SPM-630 PSI,40 SPM-790 PSI 12:00 - 14:30 2.50 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 10,815'MD,TO 10,913',END OF PRODUCTION HOLE BUILD SECTION 300 GPM,1880-1960 PSI,40 RPM ROTATING, 9-12/9-10 KFT-LBS TRQ ON/OFF BTM,5-25 KLBS WOB -PU-210K,SOW-133K,ROT-160K -MW IN/OUT=8.6 PPG -NO LOSSES WHILE DRILLING AHEAD -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS -TOTAL DRILLING TIME FOR PAST 24 HOUR REPORTING PERIOD=8.1 HRS -TOTAL JAR HOURS-18.8 14:30 - 16:30 2.00 DRILL P PROD1 CIRCULATE 2 BOTTOMS UP -300 GPM,W/1820 PSI,40 RPM,8-9K TQ PUMP HIGH VIS SWEEP SLOW CIRCULATION RATES,10,913'MD, 9,000'TVD, 8.6 PPG MW: MP#1: 30 SPM-570 PSI,40 SPM-795 PSI MP#2: 30 SPM-570 PSI,40 SPM-735 PSI -MONITOR WELL 10 MIN PRIOR TO PULLING OFF BOTTOM-WELL STATIC Printed 4/3/2017 9:51:51AM 'All depths reported in Drillers Depths` • North America-ALASKA-BP • Page 52 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) ' Start Date:2/6/2017 End Date:3/15/2017 rX3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. i BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 17:30 1.00 DRILL P PROD1 PUMP AND PULL OUT OF THE HOLE FROM 10,913'MD TO 10,140'MD -PU-195K,SO-188K,AT10,140'MD !-2 BPM,AT 80 FPM FROM 10,913'MD TO 10,140'MD -MONITOR WELL 10 MIN PRIOR TO PULLING INTO THE 7"SHOE AT 10,141' 17:30 - 23:30 6.00 DRILL P PROD1 PUMP AND PULL OUT OF THE HOLE FROM 10,140'MD TO 3,949'MD -PU-195K,SO-188 K,AT 10,140'MD -2 BPM,AT 80 FPM FROM 10,140'MD TO 6,000'MD -2 BPM,AT 90 FPM FROM 6,000'MD TO 5,000' 'MD '-2 BPM,AT 100 FPM FROM 5,000'MD TO 4,000'MD TRIP SPEEDS MAINTAIN ECD'S ABOVE THE 8.36 PPG MOST LIKELY PORE IN THE SAG 23:30 - 00:00 0.50 DRILL P PROD1 KICK WHILE TRIPPING DRILL(D1)1:45 -SPILL DRILL:2 MIN -AAR FOR D1 DRILL 3/2/2017 00:00 - 02:00 2.00 DRILL P PROD1 ,POOH WITH 6-1/8"PRODUCTION BUILD BHA ON ELEVATORS FROM 3,949'MD TO 171' PU-88K,SO-85K -PULLAT 50 FPM FROM 3,949'TO 3,000'MD -PULL AT 190 FPM FROM 3,000'MD TO SURFACE LAY DOWN/STAND BACK 6-1/8"DRILLING ASSEMBLY -FLOW CHECK 10 MIN @ BHA(STATIC) !-MW-8.6 PPG IN/OUT D1 KICK WHILE TRIPPING DRILL WITH AAR. 02:00 - 03:30 1.50 DRILL P PROD1 PULL AND LAY DOWN PRODUCTION HOLE BUILD BHA#5 FROM 171'MD BIT GRADE:3-3-WT-A-E-O-BT-BHA. CLEAN AND CLEAR RIG FLOOR CLEAR RIG FLOOR OF TRIP HAZARDS. -INSPECT SAVER SUB. 03:30 - 06:30 3.00 DRILL P PROD1 MAKE UP 6-1/8"RSS DRILLING BHA#6 FROM SURFACE TO 220'MD -INCLUDE 6-1/8"HCC PDC,AUTOTRAK RSS, ONTRAK MWD(UPLOAD TOOL),SDN(LOAD NUKES) -PLUG IN AND SURFACE TEST DIRECTIONAL TOOLS PER BAKER(PASS) '-FLOW CHECK WELL 10 MIN PRIOR TO RIH (STATIC) 06:30 - 12:30 6.00 DRILL ' P PROD1 RIH WITH 6-1/8"RSS DRILLING BHA ON ELEVATORS FROM 220'MD TO 10,913'MD -PU-194K,SO-141K !-180 FPM TRIP IN HOLE SPEED,MAINTAINS ECD'S UNDER 9.8 PPG FILL PIPE EVERY 1880'MD -MONITORING DISPLACEMENT ON TRIP TANK-CORRECT DISPLACEMENT. -MW 8.6 PPG IN/OUT -SHALLOW HOLE TEST MWD TOOLS AT 1,440' 1 MD-GOOD TEST Printed 4/3/2017 9:51:51AM *AII depths reported in Drillers Depths* North America-ALASKA-BP Page 53 of 78 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) • 12:30 17:30 5.00 DRILL P PROD1 MAD PASS FOR CALIPER FROM 10,913 MD TO 10,140'MD AT 300 FPH -300 GPM,1750 PSI I-NO ROTATION -FLOW CHECK WELL 10 MIN AT THE SHOE- WELL STATIC 17:30 - 18:00 0.50 DRILL P PROD1 IRIH WITH 6-1/8"RSS DRILLING BHA ON ELEVATORS FROM 10,141'MD TO 10,913'MD -RIH AT 180 FPM MONITORING DISPLACEMENT ON TRIP TANK-CORRECT DISPLACEMENT. 18:00 - 20:00 2.00 DRILL N I DFAL 10,913.00 PROD1 I SEND DOWN LINK TO MWD TOOLS TO SET FOR DRILL MODE -MWD UNABLE TO GET SIGNAL FROM THE NEAR BIT INCLINATION AND STEERING HEAD TOOL.. - RUNNING BAKER STANDARD HARD RESET PROCEDURE. -ATTEMPTED TO RE-ESTABLISH CONNECTION WITH MULTIPLE DOWNLINKS -UNABLE TO RE-ESTABLISH CONNECTION -INFORM ODE AND WSUP OF TRIP MONITOR WELL 10 MIN PRIOR TO PULLING OFF BOTTOM-WELL STATIC 20:00 - 21.30 1.50 DRILL N DFAL 10,913.00 PROD1 PUMP AND PULL OUT OF THE HOLE FROM 10,913'MD TO 10,140'MD FOR FAILED MWD STEERING HEAD -PU-201K,SO-135 K,AT 10,140'MD -2 BPM,AT 80 FPM FROM 10,913'MD TO 10,140'MD -MONITOR WELL 10 MIN PRIOR TO PULLING INTO THE 7"SHOE AT 10,141' 21:30 - 00:00 2.50 DRILL N DFAL 10,913.00 PROD1 PUMP AND PULL OUT OF THE HOLE FROM 10,141'MD TO 7,600'MD PU-160K,SO-155K,AT10,140'MD -2 BPM,W/230 PSI AT 80 FPM FROM 10,140' MD TO 6,000'MD TRIP SPEEDS MAINTAIN ECD'S ABOVE THE 8.36 PPG MOST LIKELY PORE IN THE SAG. 3/3/2017 00:00 - 05:00 5.00 DRILL N DFAL 10 913.00 PROD1 PUMP AND PULL OUT OF THE HOLE FROM 7,600'MD TO 220'MD PU-160K,SO-155K,AT10,140'MD -2 BPM,W/230PSI AT 80 FPM FROM 10,140' MD TO 6,000'MD -2 BPM,AT 90 FPM FROM 6,000'MD TO 5,000' MD -2 BPM,AT 100 FPM FROM 5,000'MD TO 4,000'MD -PULLED ON ELEVATORS AT 50 FPM FROM 4,000'MD TO 3,000'MD -190 FPM FROM 3,000'MD TO SURFACE. MONITORING ON THE TRIP TANK. TRIP SPEEDS MAINTAIN ECD'S ABOVE THE 8.36 PPG MOST LIKELY PORE IN THE SAG FLOW CHECK WELL 1OMIN PROIOR TO PULLING BHATRHOUGH THE STACK. • 05:00 - 07:30 2.50 DRILL N DFAL 10,913.00 PROD1 BREAK AND LAY DOWN RSS BHA#6 FROM 220' REMOVE SOURCE PER BAKER PROCEDURE -RACK BACK COLLARS -PLUG IN&DOWN LOAD TOOL Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths` • North America-ALASKA-BP S Page 54 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 'X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:30 - 08:30 1.00 DRILL N DFAL 10,913.00 PROD1 CHANGE OUT SAVER SUB 08:30 - 10:30 2.00 DRILL N DFAL 10,913.00 PROD1 MAKE UP&RIH WITH 6-1/8"RSS BHA#7 FROM SURFACE TO 220'MD -SAME BHAAS BHA#6,HOWEVER WITHA NEW STEERING HEAD ASSEMBLY 10:30 - 12:00 1.50 DRILL N DFAL 10,913.00 PROD1 TRIP IN THE HOLE WITH 6-1/8"DRILLING ASSEMBLY ON ELEVATORS FROM BHA AT 220"MD TO 1,919'MD. 180 FPM RUNNING SPEED PER THE THE PROGRAM TO MAINTAIN ECD UNDER 9.8 PPG - MONITOR DISPLACEMENT W/TRIP TANK- CORRECT DISPLACEMENT OBSERVED MW 8.6 PPG IN/OUT 12:00 - 16:00 4.00 DRILL N DFAL 10,913.00 PROD1 TRIP IN THE HOLE WITH 6-1/8"DRILLING ASSEMBLY ON ELEVATORS FROM 1,919'MD TO 10,140' -PU-188K,SO-1-41K - MONITOR DISPLACEMENT W/TRIP TANK- CORRECT DISPLACEMENT OBSERVED -180 FPM RUNNING SPEED PER THE THE PROGRAM TO MAINTAIN ECD UNDER 9.8 PPG 16:00 - 16:30 0.50 DRILL N DFAL 10,913.00 PROD1 FUNCTION TEST DOWN HOLE TOOLS AT THE 7" SHOE ESTABLISH CIRCULATION.300 GPM WITH 1850 PSI,30 RPM W/7K TW FUNNCTION TEST MWD-GOOD TEST 16:30 - 17:00 0.50 DRILL N DFAL 10,913.00 PROD1 TRIP IN THE HOLE WITH 6-1/8"DRILLING ASSEMBLY ON ELEVATORS FROM 10,140'MD TO 10,913'MD -PU-210K,SO-135K - MONITOR DISPLACEMENT W/TRIP TANK- CORRECT DISPLACEMENT OBSERVED 17:00 - 23:30 6.50 DRILL P 10,913.00 PROD1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 10,913'MD TO 11,181'MD,8,943'TVD (268'IN 6.5 HRS=41 FPH WITH CONNECTIONS) -40-100 FPH INSTANTANEOUS ROP -300 GPM,1850-1650 PSI,120-14 RPM ROTATING,9-12/9-10 KFT-LBS TRQ ON/OFF BTM,5-25 KLBS WOB -PU-195K,SOW-135K,ROT-160K -MW IN/OUT=8.6 PPG -NO LOSSES WHILE DRILLING AHEAD -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS SLOW CIRCULATION RATES,10,915'MD,8.6 PPG MW: MP#1: 30 SPM-550 PSI,40 SPM-745 PSI MP#2: 30 SPM-545 PSI,40 SPM-740 PSI 23:30 - 00:00 0.50 DRILL P 10,913.00 PROD1 RIG SERVICE -SERVICE TOP DRIVE,WASH PIPE AND RIG FLOOR EQUIPMENT • Printed 4/3/2017 9:51:51AM `AII depths reported in Drillers Depths* IIINorth America-ALASKA-BP • Page 55 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) 1 Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943 00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/4/2017 00:00 - 06:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 11,181'MD,TO 11,475'MD -40-100 FPH INSTANTANEOUS ROP 1-300 GPM,1850-1650 PSI,120-140 RPM ROTATING,14K TQ ON,10K TQ OFF, 5-15 ' KLBS WOB -PU-195K,SOW-135K,ROT-160K '-MW IN/OUT=8.6 PPG -NO LOSSES WHILE DRILLING AHEAD -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS SLOW CIRCULATION RATES,10,915'MD,8.6 PPG MW: MP#1: 30 SPM-550 PSI,40 SPM-745 PSI MP#2: 30 SPM-545 PSI,40 SPM-740 PSI 06:00 - 12:00 6.00 DRILL P 1 PROD1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 11,475'MD TO 11,793'MD.318' DRILLED AVG 153 FPH WITH CONNECTIONS. 40-100 FPH INSTANTANEOUS ROP -300 GPM,1900-1850 PSI,120-140 RPM ROTATING,14KTQ ON,11KTQ OFF, 5-15 KLBS WOB -PU-203K,SOW-133K,ROT-156K -MW IN/OUT=8.7 PPG MINIMAL LOSSES OBSERVED WHILE DRILLING AHEAD- AVG 40-50 BPH LOSSES STARTED AROUND-11,600'MD 1-SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS 1 SLOW CIRCULATION RATES,11,650'MD,8.7 PPG MW: MP#1: 30 SPM-550 PSI,40 SPM-745 PSI MP#2: 30 SPM-545 PSI,40 SPM-740 PSI Printed 4/3/2017 9.51:51AM °All depths reported in Drillers Depths° • North America-ALASKA-BP • Page 56 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM !Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 12:00 - 00:00 12.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 11,793'MD TO 12,500'MD.707 FT DRILLED AVG 59 FPH W/CONNECTIONS-50-100 FPH INSTANTANEOUS ROP -300 GPM,1950-1900 PSI,120-140 RPM ROTATING,13K TQ ON,10K TQ OFF, 5-15 KLBS WOB • PU-198K,SOW-137K,ROT-158K -MW IN/OUT=8.7 PPG -SLIGHT LOSSES WHILE DRILLING AHEAD -AVGE 30-50 BPH LOSS RATE -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS -FAULT#7 CALLED AT 12,205'MD.NO ADDITIONAL LOSSES OBSERVED.FUALT THROW ESTIMATED AT 70'FAULTING US FROM THE 44P MARKER UP TO THE TSAD OR 46P MARKER. SLOW CIRCULATION RATES,12,405'MD,8.7 PPG MW: MP#1: 30 SPM-575 PSI,40 SPM-760 PSI MP#2: 30 SPM-590 PSI,40 SPM-770 PSI TOTAL LOSSES FOR 24 HRS-508 BBLS 3/5/2017 00:00 - 02:00 2.00 DRILL P PROD1 1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 12,500'MD TO 12,587'MD. 50-100 FPH INSTANTANEOUS ROP -300 GPM,1950-1900 PSI,120-140 RPM ROTATING,13K TO ON,10K TQ OFF, 5-15 KLBS WOB -PU-191K,SOW-137K,ROT-158K -MW IN/OUT=8.7 PPG MINIMAL LOSSES WHILE DRILLING AHEAD -AVGE 30-50 BPH LOSS RATE -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS -TROUBLE SHOOTING PULSER TOOL. PULSER TOOL NOT STAYING ON,RUNNING BAKER RESET PROTOCOL. 02:00 03:00 1.00 DRILL P PROD1 CIRCULATE HIGH VIS SWEEP -PUMPED 35 BBL HIGH VIS SWEEP AT 12,585' MD.DIDNT SEE MUCH INCREASE IN CUTTINGS AT BOTTOMS UP.SWEEEP CAME BACK 300 STROKES LATE. OBSERVED 6K LESS DRAG ON THE PICK UP WEIGHT. -320 GPM WITH 2108 PSI -WORKING PIPE 75'WHILE ROTATING 140 RPM WITH 11KTQ Printed 4/3/2017 9:51:51AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 57 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 06:30 3.50 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 12,587'MD TO 12,654'MD. 50-100 FPH INSTANTANEOUS ROP -300 GPM,1950-1900 PSI,120-140 RPM ROTATING,13K TQ ON,10K TQ OFF, 5-15 KLBS WOB -PU-185K,SOW-137K,ROT-137K -MW IN/OUT=8.7 PPG ' -STILL TROUBLE SHOOTING PULSER TOOL. PULSER TOOL NOT STAYING ON,MWD RUNNING DIAGNOSTIC TESTS. -MINIMAL LOSSES WHILE DRILLING AHEAD -AVGE 30-50 BPH LOSS RATE '-SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD 1-NO BACKREAMING AT CONNECTIONS 06:30 - 10:00 3.50 DRILL N DFAL 12,654.00 PROD1 PUMP&PULL OUT OF THE HOLE FROM 12,654'MD TO 10,120'MD.FOR FAILED MWD PULSER TOOL(BCPM) -80 FPM,-2 BPM WITH 320 PSI. -FOLLOWING TRIP SPEEDS OUTLINED IN WELL PROGRAM TO MAINTAIN ECD'S OVER 8.36 PPG -MONITOR WELL 10 MIN-WELL STATIC -PU-185K,SO-138K,AT 12,654'MD MW 8.7 PPG IN/OUT -TIGHT HOLE AT 11,485'MD WITH 20K OVER I PULL -BACK REAM TIGHT SPOT AT 4 BPM,AND 40 RPM. 10:00 - 11:00 1.00 DRILL N DFAL 12,654.00 PROD1 CIRCULATE BOTTOMS INSIDE THE 7"SHOE AT 10,120'MD 300 GPM,WITH 1450 PSI.NO ROTATION --MONITOR WELL 10 MIN-WELL STATIC -RAN MWD DIAGNOSTIC TEST-TOOL STILL FAILING TO PULSE CONSISTENTLY. 11:00 - 17:00 6.00 DRILL N DFAL 12,654.00 PROD1 CONT:PUMP&PULL OUT OF THE HOLE FROM 10,120'MD TO 4000'MD -80 FPM,F/10,120'MD TO 6,000-2 BPM WITH 320 PSI. -90 FPM F/6000'MD TO 5,000'MD -100 FPM F/5,000'MD TO 4,000'MD -FOLLOWING TRIP SPEEDS TO MAINTAIN ECD'S OVER 8.36 PPG -PU-178K,SO-130K,AT 12,120'MD MW 8.7 PPG IN/OUT D1 DRILL CONDUCTED WITH AAR 17:00 - 19:30 2.50 DRILL N DFAL 12,654.00 PROD1 POOH ON ELEVATORS FROM 4,000'MD TO 300' -PU-95K,SO-90K - MONITOR WELL ON TRIP TANK-WELL ON LOSSES. '-POOH AT 50 FPM TO 3000',140 FPM TO 300' -FLOW CHECK WELL 10 MIN PROIOR TO PULLING BHA TRHOUGH THE STACK. Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 58 of 76 ra Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 21:30 2.00 DRILL N DFAL 12,654.00 PROD1 BREAK AND LAY DOWN RSS BHA#6 FROM 220' -REMOVE SOURCE PER BAKER PROCEDURE -RACK BACK COLLARS -PLUG IN&DOWN LOAD TOOL,FUNCTION TEST MWD TOOLS FOR VERIFICATION OF INTEGRITY. _ 21:30 - 22:00 0.50 DRILL P PROD1 RIG SERVICE GREASE TOP DRIVE AND BLOCKS. 22:00 - 00:00 2.00 DRILL N DFAL 12,654.00• PROD1 MAKE UP&RIH WITH 6-1/8"RSS BHA#8 '-MAKE UP NEW BHA WITH NEW BCPM OR PULSE TOOL. -BIT CONDITION INSPECTED FOR RE-RUN. -BIT IN GUAGE AND GRADED A 1-1 AND WILL BE RUN BACK IN THE HOLE. -BAKER MWD VERIFYING THE TOOL INTEGRITY ON SURFACE BEFORE RUNNING • IN THE HOLE. TOTAL LOSSES FOR PREVIOUS 24 HRS-436 BBLS 3/6/2017 00:00 - 01:00 1.00 DRILL N DFAL 12,654.00 i PROD1 CONTINUE TO MAKE UP 6-1/8"RSS BHA#8 FROM SURFACE TO 220'MD CHANGE OUT BCPM PULSER TOOL,RUN ALL OTHER TOOLS BACK IN HOLE -PERFORM EXTENSIVE SHALLOW HOLE TEST AT SURFACE(PASS) 01:00 - 06:00 5.00 DRILL N DFAL 12,654.00 PROD1 RUN IN HOLE WITH 6-1/8"RSS ASSEMBLY FROM 220'TO 12654'MD ON ELEVATORS '-TRIPPING SPEED=180 FPM(MAINTAIN ECD BELOW 9.8 PPG) -TIGHT HOLE ENCOUNTERED AT 11485'MD (DISCONTINUOUS SHALE),11620'MD(45N SHALE)AND 12210'MD(FAULT CROSSING) WITH 10K DOWN,ABLE TO WIPE CLEAN WITH NO ISSUE -MONITOR WELL VIA TRIP TANK,GOOD DISPLACEMENT -FILL PIPE EVERY 20 STANDS -MW 8.7 PPG IN/OUT -TOTAL LOSSES WHILE RUNNING IN HOLE= 60 BBLS -TEST MWD TOOLS AND PULSER AT 7" CASING SHOE(10141'MD)PRIOR TO RUNNING INTO OPEN HOLE,NO ISSUE Printed 4/3/2017 9:51:51AM *AII depths reported in Drillers Depths" IIINorth America-ALASKA-BP • Page 59 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 12654'TO 12805'MD IN EILEEN AND 46P(SAD) FORMATIONS(151'IN 6 HRS=25 FPH WITH CONNECTIONS) INTERMITTENT PULSER ISSUES ONCE ON BOTTOM,TOOL SHUTTING OFF PERIODICALLY(IDENTICAL ISSUE TO 'YESTERDAY'S FAILURE) VARY RPM,CYCLE TOOL AND TURN SOFTSPEED ON/OFF IN ATTEMPT TO GET TOOL FUNCTIONING CORRECTLY-NO ISSUES AT 80 RPM j -DROP ANGLE TO 84.5°TO GET OUT OF EILEEN,DRILL INTO TSAD AT 12753'MD (TOTAL OF 237'MD PRODUCTIVE FOOTAGE LOST IN EILEEN FORMATION) -25 FPH INSTANTANEOUS ROP IN EILEEN, 80-100 FPH INSTANTANEOUS ROP IN IVISHAK -300 GPM,1820-1880 PSI,80 RPM,10-12/9-10 KFT-LBS TRQ ON/OFF BTM,8-15 KLBS WOB -MW IN/OUT=8.7 PPG LOSSES:30-50 BPH WHILE DRILLING AHEAD -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD : -NO BACKREAMING AT CONNECTIONS SLOW CIRCULATION RATES,12654'MD,8.7 PPG MW: MP#1: 30 SPM-695 PSI,40 SPM-960 PSI MP#2: 30 SPM-695 PSI,40 SPM-950 PSI 12:00 - 18:00 I 6.00 DRILL 1 P PROD1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 12805'TO 13164'MD IN 46P(SAD)FORMATION ' (359'IN 6 HRS=60 FPH WITH CONNECTIONS) -SLOWLY INCREMENT UP TO 120-130 RPM, PULSER TOOL FUNCTIONING CORRECTLY -50-120 FPH INSTANTANEOUS ROP -300 GPM,1880-1900 PSI,80-130 RPM, 11-12/9-10 KFT-LBS TRQ ON/OFF BTM,15 KLBS WOB -MW IN/OUT=8.7 PPG -LOSSES:20-30 BPH WHILE DRILLING AHEAD -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* North America-ALASKA-BP S Page 60 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 13164'TO 13480'MD(8974'TVD)IN 46P(SAD) FORMATION(316'IN 6 HRS=53 FPH WITH CONNECTIONS) PULSER FUNCTIONING CORRECTLY -50-120 FPH INSTANTANEOUS ROP -300 GPM,1880-1950 PSI,120-140 RPM, 11-12/9-10 KFT-LBS TRQ ON/OFF BTM,12-15 KLBS WOB -MW IN/OUT=8.7 PPG LOSSES:20-30 BPH WHILE DRILLING AHEAD -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS -PERFORM RIG SERVICE DURING LONG CONNECTION -TOTAL DRILLING TIME FOR PAST 24 HOUR REPORTING PERIOD=10.2 HRS(57%) SLOW CIRCULATION RATES,13447'MD,8.7 'PPG MW: MP#1: 30 SPM-630 PSI,40 SPM-810 PSI MP#2: 30 SPM-630 PSI,40 SPM-820 PSI 3/7/2017 00:00 - 13:30 I 13.50 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PROD HOLE FROM 13480'TO 14049'MD IN 46P(SAD)FORMATION (596'IN 13.5 HRS=42 FPH WITH CONNECTIONS) -40-120 FPH INSTANTANEOUS ROP -300 GPM,1950-2000 PSI,120-150 RPM, 11-12/9-10 KFT-LBS TRQ ON/OFF BTM,14 KLBS WOB -MW IN/OUT=8.7 PPG -LOSSES:20-30 BPH WHILE DRILLING AHEAD I -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS -CROSS FAULT#8 AT 13,538'MD (PRELIMINARY PICK),NO INCREASE IN LOSSES CROSS ADDITIONAL FAULT/FRACTURE AT 13,720' -100%LOST RETURNS -CONTINUE DRILLING AHEAD FROM 13720' MD TO 13984'MD WHILE PUMPING DRILL AHEAD PILLS AS DIRECTED IN THE BAROID LOST CIRCULATION DECISION TREE -PUMPED(3)40 BBL,40 PPB DRILL AHEAD PILLS AND(1)80 BBL,40 PPB PILL -NO CHANGE IN LOSS RATE FROM DRILL AHEAD PILLS CONSULT WITH ODE,WSUP,ENGINEERING TL FOR PLAN FORWARD -DECISION WAS MADE TO FUNCTION OPEN THE NOV(MOCS)CIRCULATION SUB TO PUMP HIGHER CONCENTRATION LCM PILLS Printed 4/3/2017 9:51:51AM `AII depths reported in Drillers Depths* 4 North America-ALASKA-BP S Page 61 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 15:30 2.00 DRILL N DPRB 14,049.00 PROD1 ACTIVATE NOV MOCS TOOL FOR BYPASS OPERATION REVIEW NOV PROCEDURE FOR ACTIVATION AND CONSULT WITH NOV REP IN ANCHORAGE FOR PUMPING PARAMETERS -DROP 1-5/8"ACTIVATION BALL,VERIFIED CORRECT SIZE BALL PRIOR TO DROP -PUMP BALL DOWN AT 225 GPM,800 PSI -HALFWAY DOWN REDUCE RATE BELOW 200 I GPM PER NOV MOCS PROCEDURE. -PUMP BALL DOWN AT 156 BPM,560 PSI UNTIL BALL ON SEAT -STAGE UP PUMPS TO 300 GPM,1700 PSI -OBSERVE PRESSURE DROP TO 1000 PSI -CONFIRM CIRC SUB OPEN FROM LOSS OF COMMUNICATION WITH MWD -CIRCULATE AT 225 GPM WITH 880 PSI - LOSS RATE-300 BPH SIMOPS:BUILDING 100 BBLS OF 80 PPB SUPER PILL 15:30 - 17:30 2.00 DRILL N DPRB 14,049.00 PROD1 PUMP 100 BBLS OF 80 PPB SUPER PILL PER BAROID LOST CIRCULATION DECISION TREE -PUMP PILL DOWN AND OUT THE MOCS CIRCULATION SUB 220'BEHIND THE BIT AT 13829'MD AND-109'AHEAD OF THE FAULT AT 13720'MD -225 GPM,750 PSI,120 RPM,9 KFT-LBS TQ -LOWER RATE TO 175 GPM,475 PSI WHEN PILL EXITING CIRC SUB -WITH 24 BBLS OF PILL OUT OF THE CIRC SUB,BEGIN TO SEE PRESSURE INCREASE FROM 475 TO 1235 PSI CONTINUE TO PUMP AT 175 GPM AND OBSERVE PRESSURE INCREASE FROM 1235 TO-1600 PSI -OBSERVE RETURNS AT SURFACE -LOSS RATE DECREASED FROM-300 BPH TO-30 BPH FOR 30 MIN -OBSERVED 89%FLOW,-107 BBLS RETURNED TO SURFACE -175 GPM,ICP=1602,FCP=1542 -ATTEMPT TO INCREASE FLOW RATE TO 225 GPM AND INITIALLY OBSERVE PRESSURE INCREASE TO 1835 PSI -OBSERVE PRESSURE DECREASE TO 800 PSI,AND LOST 100%RETURNS,-300 BPH LOSS RATE -CIRCULATE AT 175 GPM,800 PSI TO PUMP REMAINDER OF SUPER PILL OUT OF THE CIRCULATION SUB CONSULT WITH ODE,WSUP,ENGINEERING TL FOR PLAN FORWARD Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 62 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 21:00 3.50 DRILL N DPRB 14,049.00 PROD1 PUMP 80 PPB BARAFLAKE SUPER PILL -BARAFLAKE PILLS ARE CONTINGENCY PILLS FROM BAROID MUD PROGRAM IN THE EVENT THAT DRILL AHEAD PILLS ARE NOT EFFECTIVE -PUMP 120 BBLS OF 80 PPB BARAFLAKE PILL MIXTURE#2 FROM PAGE 56 OF THE BAROID MUD PROGRAM ,-175 GPM,800 PSI,RECIPROCATING PIPE 30' WHILE PUMPING -SLOW FLOW RATE TO 150 GPM WHEN PILL EXITS THE CIRC SUB -NO IMPROVEMENT IN LOSS RATE **150 GPM IS MIN FLOW RATE RECOMENDED BY NOV TO BE PUMPED THROUGH THE MOCS TOOL IN ORDER TO MAINTAIN TOOL IN BYPASS MODE. 21:00 22:00 1.00 DRILL N DFAL 14,049.00 PROD1 PUMP 100 BBLS OF 80 PPB SUPER PILL PER THE BAROID LOST CIRCULATION DECISION TREE '-PUMP PILL DOWN AND OUT THE MOCS CIRCULATION SUB 220'BEHIND THE BIT AT 13829'MD AND 109'AHEAD OF THE FAULT AT 13720'MD. 175 GPM,800 PSI,RECIPROCATE PIPE WITH 40'STROKES -PU=195K,SO=195K -SLOW PUMPS TO 150 GPM,630 PSI FOR PILL EXITING CIRC SUB -OBSERVED PRESSURE SPIKE FROM 650 PSI TO 1600 PSI,SIMILAR TO PRESSURE TREND SEEN PREVIOUSLY WHEN CIRCULATION WAS REESTABLISHED AT 17:00 HRS -OBSERVE PRESSURE CONTINUE TO INCREASE TO 2800 PSI,SHUT DOWN PUMPS FOR PACKED OFF DRILL STRING 22:00 - 23:30 1.50 DRILL N DFAL 14,049.00 PROD1 TROUBLESHOOT PACKED OFF DRILL STRING -MADE SEVERAL ATTEMPTS TO FREE PACKED OFF DRILL PIPE -MADE SEVERAL ATTEMPTS CYCLING AND SURGING PRESSURE TO 1900 PSI,THEN BLEEDING OFF PRESSURE QUICKLY WITH AND WITHOUT ROTATION -UNABLE TO FREE PACKED OFF PIPE -FOLLOWING PACK OFF,STATIC LOSS RATE DECREASED AND STABALIZED AT 5 BBLS/HR CONSULT WITH ODE,WSUP,ENGINEERING TL FOR PLAN FORWARD -DECISION WAS MADE TO PULL OUT OF THE HOLE ON ELEVATORS SLOWLY PER BAROID SWAB MODELING TRIPPING SCHEDULE WITH MOST CONSERVATIVE FLUID PROPERTIES Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 63 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2.00:OOAM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 DRILL N DFAL 14,049.00 PROD1 PULL OUT OF HOLE ON ELEVATORS FROM 14049'MD TO 13545'MD PU=195K,SO=133K -MONITOR WELL PRIOR TO PULLING OFF I BOTTOM,STATIC LOSS RATE=5-6 BPH -MONITOR FIRST TWO STANDS,OBSERVE FLUID LEVEL DROPPING IN STACK -LINE UP TO TRIP TANK WITH CONTINUOUS HOLE FILLAND CONTINUE TO PULL OUT OF HOLE -PULLING SPEEDS ACCORDING TO BAROID SWAB SURGE MODEL AND GUIDANCE FROM ANCHORAGE TEAM TO MAINTAIN ECD'S OVER THE 8.36 PPG MOST LIKELY PORE 'PRESSURE IN THE SAG. PULLING AT 10 FT/MIN -FIRST 10 STANDS:ACTUAL HOLE FILL=9.7 BBLS,CALCULATED HOLE FILL=5.4 BBLS, INDICATING A LOSS OF 4.3 BBLS IN THE FIRST 10 STANDS 3/8/2017 00:00 - 12:00 12.00 DRILL N DFAL 14,049.00 PROD1 I PULL OUT OF HOLE ON ELEVATORS WITH 6-1/8"DRILLING ASSEMBLY FROM 13545'MD TO 7950'MD -PU=195K,SO=133KAT 13545'MD -STATIC LOSS RATE=5-6 BPH -TRIPPING SPEEDS PER BAROID SWAB MODELING:PULLING AT 10 FT/MIN -OBSERVE NO INDICATIONS OF SWABBING WHILE PULLING OUT OF THE HOLE MONITOR HOLE FILL WITH TRIP TANK: GOOD HOLE FILL -OBSERVE TIGHT SPOT AT 12775'MD,ABLE TO PULL THROUGH WITH 20-35 KLBS OVERPULL AND NO ROTATION,WIPED BACK THROUGH WITH NO ISSUES FLOW CHECK WELL FOR 10 MINUTES:5 BPH STATIC LOSS RATE -ATTEMPT TO CLEAR PLUGGED DRILL PIPE AT THE 7"SHOE AT 10140'MD BY PRESSURING UP TO 2000 PSI,WITH NO SUCCESS -OBSERVE FIBROUS LCM IN FLUID DRAINING FROM DRILL PIPE AT 8300'MD AFTER BREAKING OFF A STAND FIRST SIGNS OF LCM IN DRILL PIPE INDICATE 57 BBLS OF 80 PPB SUPER PILL REMAINING IN DRILL PIPE,42 BBLS OF SUPER PILL WERE PUMPED OUTSIDE THE CIRC SUB Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths* • • North America-ALASKA-BP • Page 64 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM 'Rig Release:3/20/2017 Rig Contractor PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 23:30 11.50 DRILL N DFAL 14,049.00 PROD1 PULL OUT OF HOLE ON ELEVATORS WITH 6-1/8"DRILLING ASSEMBLY FROM 7950'MD TO 700'MD PU=150K,S0=140KAT7950' MD -STATIC LOSS RATE=5-6 BPH -OBSERVE NO INDICATIONS OF SWABBING WHILE PULLING OUT OF THE HOLE MONITOR HOLE FILL WITH TRIP TANK: GOOD HOLE FILL CONTINUE TO OBSERVE LCM AND FIBROUS MATERIAL INSIDE OF THE DRILL PIPE -UNABLE TO DRAIN FULL STANDS BECAUSE OF PLUGGING FROM LCM,BREAKING OFF SINGLES ON SEVERAL STANDS TO UNPLUG DRILLPIPE IN SMALLER SECTIONS STARTING AT THE HWDP(-2490'MD) TRIPPING SPEEDS PER BAROID SWAB MODELING '-8000'-7000'MD=15 FT/MIN 7000'-6000'MD=20 FT/MIN -6000'-5000'MD=25 FT/MIN -5000'-4000'MD=40 FT/MIN -4000'-3500'MD=70 FT/MIN '-3500'-SURFACE=100 FT/MIN 23:30 - 00:00 0.50 DRILL P PROD1 SERVICE TOP DRIVE AND RIG FLOOR EQUPIMENT 3/9/2017 I 00:00 - 01:30 1.50 DRILL N DFAL 14,049.00 PROD1 PULL OUT OF HOLE ON ELEVATORS FROM 700'MD TO 220'MD(TOP OF CIRCULATION SUB) -PU=50K,SO=50K AT 700'MD -STATIC LOSS RATE=5-6 BPH MONITOR HOLE FILL WITH TRIP TANK: GOOD HOLE FILL -CONTINUE TO OBSERVE LCM AND FIBROUS MATERIAL INSIDE OF THE DRILL PIPE -UNABLE TO DRAIN FULL STANDS BECAUSE OF PLUGGING FROM LCM,BREAKING OFF SINGLES ON SEVERAL STANDS TO UNPLUG DRILLPIPE IN SMALLER SECTIONS 01:30 03:30 2.00 DRILL N DFAL 14,049 00 PROD1 LAY DOWN BHA PER BAKER DD AND MWD FROM 220'MD TO SURFACE -INSPECT NOV MOCS TOOL AND OBSERVE TOOL IN CLOSED POSITION -BHA COMPONENTS BELOW MOCS TOOL COMPLETELY PLUGGED OFF WITH LARGE AMOUNTS OF LCM AND FIBROUS MATERIAL -UNLOAD NUCLEAR SOURCE PER BAKER DD/MWD -BIT GRADE:1-1 -STATIC LOSS RATE=-1 BPH 03:30 - 04:00 0.50 DRILL N DFAL 14,049.00 PROD1 CLEAN AND CLEAR RIG FLOOR 04:00 - 04:30 0.50 CLEAN N DFAL 14,049.00 PROD1 MAKE UP DUMB IRON CLEANOUT BHA PER BAKER DD AND MWD FROM SURFACE TO 102' MD PER OCN#16 -MILL TOOTH BIT(WITH NO JETS),BIT SUB WITH PORTED FLOAT,STRING STABALIZER, (3)DRILL COLLARS,(5242')DRILL PIPE, CROSSOVER,(3)HWDP,JARS,(3)HWDP -NO STATIC LOSSES WHILE MAKING UP BHA Printed 4/3/2017 9:51:51AM *AII depths reported in Drillers Depths* •• North America-ALASKA-BP Page 65 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 11:00 6.50 CLEAN N DFAL 14,049.00 PROD1 TRIP IN HOLE WITH 6-1/8"DUMB IRON CLEANOUT BHA FROM BHAAT 102'MD TO HARD TAG AT 12735 MD. -CASED HOLD TRIPPING SPEEDS=180 FPM,OPENHOLE SPEEDS=40-75 FPM DEPENDENT ON PUSHING AWAY FLUID FILL PIPE EVERY 20 STANDS. CIRCULATE ADDITIONAL VOLUMES TO FLUSH DRILLSTRING OF LCM -NO HOLE ISSUES UNTIL HARD TAG AT 12735' MD IN EILEEN FORMATION NEAR TRANSITION BACK INTO IVISHAKAT 12753'MD(-120'PAST REVERT POINT#2) 11:00 - 16:00 5.00 CLEAN N DPRB 14,049.00 PROD1 WORK CLEANOUT ASSEMBLY DOWN FROM 12735'MD TO 12749'MD OVER 5 HOURS AS FOLLOWS. -STAGE UP PUMPS FROM 1 BPM TO 5 BPM. CIRCULATE MAJORITY OF TROUBLE TIME AT 5 BPM,500-650 PSI, -STAGE UP SET DOWN WEIGHTS FROM 30-50 KLBS,ATTEMPTING RUNNING SPEEDS 10-100 FPM. PU/SO WEIGHTS=195/140 KLBS BRIEFLY ATTEMPT TO ROTATE AT 10 AND 30 RPM,4-6 KFT-LBS TRQ FOR 3 MIN INTERVALS EACH WITH VERY LIMITED WOB. NO MAJOR GAINS. -CONTINUE TO STAGE UP SET DOWN !WEIGHTS TO 40-70 KLBS WITH VERYING RUNNING SPEEDS. -DISCUSS RESULTS WITH ANCHORAGE TEAM AND ELECT TO TRY MORE AGGRESIVE ROTATION WITH POSSIBLE CONSEQUENCE OF SIDETRACK. -MW IN/OUT=8.6 PPG KCL. DYNAMIC LOSS RATES VARY FROM 0-150 BPH. 16:00 - 18:00 2.00 CLEAN N DPRB 14,049.00 PROD1 UNSUCCESSFULLY ATTEMPT TO REGAIN ACCESS TO OLD WELLBORE AT 12749'MD. -5 BPM,600-650 PSI,80 RPM,6-10 KFT-LBS 'TRQ -WORK PIPE DOWN IN INTERVALS TO 12664' MD,REGULARLY PICKING UP AND ATTEMPTING TO WORK PIPE INTO OLD WELLBORE. -SEE SIGNS OF DRILLING NEW FORMATION AT 5-15 KLBS WOB,20-40 KLBS WOB DRILL/REAM PIPE DOWN TO 12775'MD -STRONG SUSPICION OF INADVERTENTLY SIDETRACKING WELLAT 12749'MD. SIGNS OF VERY TROUBLSEOME HOLE 12740-12775'MD WITH 30 KLBS OVERPULLS TO PULL OUT. -LOSS RATES INCREASE DRAMATICALLY AFTER BEGINNING TO AGRESSIVELY REAM PIPE DOWN. NEW DYNAMIC/STATIC LOSS RATES WITH 8.6 PPG KCL MW IN/OUT= 150/100 BPH. -DISCUSS RESULTS WITH ANCHORAGE TEAM AND BEGIN TO DEVLOP PLANS FOR PLANNED OPENHOLE SIDETRACK AT 12350' MD Printed 4/3/2017 9.51:51AM `All depths reported in Drillers Depths" • North America-ALASKA-BP Page 66 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 20:00 2.00 CLEAN N DPRB 14,049.00 PROD1 RECIPROCATE PIPE 50'WITH NO PUMPS OR ROTATION WHILE DEVELOPING PLAN FORWARD -PU=190 KLBS,SO=140 KLBS -STATIC LOSS RATE=100 BBUHR 20:00 - 22:30 2.50 CLEAN N DPRB 14,049.00 PROD1 PUMP(2)130 BBL 80 PPG LCM SUPER PILLS IN TANDEM WHILE RECIPROCATING PIPE IN I50'STROKES -5 BPM,ICP=600 PSI -4 BPM,FCP=490 PSI -PU=190 KLBS,SO=140 KLBS -OBSERVE DYNAMIC LOSS RATE DECREASE TO 50 BBLS/HR WHILE PUMPING SUPER PILLS -AFTER PUMPING KCL CHASE,OBSERVE LOSS RATE INCREASE TO-150 BBLS/HR DYNAMIC 22:30 - 23:30 1.00 CLEAN N DPRB 14,049.00 PROD1 RECIPROCATE PIPE 50'WITH NO PUMPS OR ROTATION -PU=190 KLBS,SO=140 KLBS -40-50 BBLS/HR STATIC LOSS RATE -CLEAN AND PREPARE PITS TO TAKE ON DRILLING MUD 23:30 - 00:00 0.50 CLEAN P PROD1 LUBRICATE RIG 3/10/2017 00:00 - 03:00 3.00 CLEAN N DPRB 14,049.00 PROD1 RECIPROCATE 50'STROKES WITHOUT PUMPS OR ROTATION AND PREPARE TO TREAT LOSSES -CLEAN PITS AND PREP TO RECIEVE MUD -MIXING LCM PILLS -STATIC LOSS RATE=40-50 BBL/HR -PU=195 KLBS,SO=136 KLBS -RUNNING CONSTANT HOLE FILL 03:00 - 04:30 1.50 CLEAN N DPRB I 14,049.00 PROD1 PUMP 20 BBL,80 PPB SUPER PILLABOVE PROBLEM ZONE AT 12735'MD PER OCN#17 -PUMP 60 BBLS OF NEW MUD AT 4 BPM,330 PSI,OBSERVE GOOD RETURNS(4-5%FLOW OUT) -PUMP 20 BBLS OF 80 PPB SUPER PILL AT 4 BPM,330 PSI -PUMP 60 BBLS OF NEW MUD AT 4 BPM,330 PSI -CHASE MUD AND SWEEP WITH 35 BBLS OF KCL AT 4 BPM,75-85 BPH DYNAMIC LOSS RATE.DISPLACE LCM OUTSIDE BIT,LEAVING 60 BBLS OF MUD IN THE PIPE. -SHUT DOWN PUMPS AND ESTABLISH STATIC LOSS RATE AT 20 BPH 04:30 - 05:30 1.00 CLEAN N DPRB 14,049 00 PROD1 PUMP AND PULL OUT OF THE HOLE AT 2 BPM, 80 FT/MIN TO ABOVE THE TOP OF THE PILL AT 11630'MD PER THE TRIPPING SCHEDULE IN THE WELL PROGRAM AND OCN#17 -PUMP AT 2 BPM,130 PSI,PULLAT 50 FT/MIN OBSERVE IMPROVEMENT IN STATIC LOSS RATE=18 BPH MONITOR HOLE FILL WITH TRIP TANK: GOOD HOLE FILL Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* North America-ALASKA-BP Page 67 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 06:30 1.00 CLEAN N DPRB 14,049.00 PROD1 WASH DOWN FROM 11630'MD TO PLANNED KICK OFF POINT AT 12350'MD TO ASSESS LOSS RATE AND CLEAR AREA OF LCM AND FIBROUS MATERIAL -PUMP AT 2 BPM,140 PSI -RUN IN HOLE AT 50 FT/MIN -OBSERVE INCREASE IN LOSS RATE WITH PUMPS ON 06:30 - 07:00 0.50 CLEAN N DPRB 14,049 00 PROD1 CIRCULATE 1/2 X BOTTOMS UP AT 12350'MD 1 -STAGE UP PUMPS SLOWLY IN 1/2 BBL INCREMENTS TO 4 BPM,331 PSI -RECIPROCATE PIPE 30'WITH NO ROTATION -INITIAL DYNAMIC LOSS RATE=70 BBLS/HR -OBSERVE DYNAMIC LOSS RATE INCREASE TO 150 BBLS/HR THROUGHOUT CIRCULATION -MW IN/OUT=8.5 PPG(3%KCL) 07:00 - 09:30 2.50 CLEAN N DPRB 14,049.00 PROD1 SHUT DOWN PUMPS,RECIPROCATE PIPE 30' WITH NO PUMPS OR ROTATION WHILE WAITING ON PLAN FORWARD. -STATIC LOSS RATE=90 BBLS/HR -OBSERVE NO IMPROVEMENT IN STATIC LOSS RATE -KEEPING HOLE FULL WITH 8.5 PPG 3%KCL 09:30 - 10:00 0.50 CLEAN N DPRB 14,049.00 PROD1 RUN IN HOLE TO 12700'MD,35'ABOVE BRIDGE OBSTRUCTION ZONE IN PREPARATION TO LAY 40 BBL LCM SUPER PILL TO ATTEMPT TO TREAT LOSSES -RUN IN HOLE AT 50 FT/MIN 10:00 - 11:30 1.50 CLEAN N DPRB 14,049.00 PROD1 1 RECIPROCATE PIPE 30'WITH NO PUMPS OR ROTATION WHILE MIXING 40 BBL,80 PPB SUPER PILL -PU=190 KLBS,SO=140 KLBS AT 12700'MD -KEEPING HOLE FULL WITH 8.5 PPG 3%KCL -OBSERVE STATIC LOSS RATE INCREASE TO 150 BBLS/HR 11:30 - 12:30 1.00 CLEAN N DPRB 14,049.00 PROD1 LAY IN LCM SUPER PILL AT 12700'MD AS FOLLOWS:PUMP 60 BBLS OF DUMBED-DOWN 8.6 PPG MUD,FOLLOWED BY 40 BBLS 80 PPB SUPER PILL,DISPLACE PILL FROM DRILL STRING WITH 140 BBLS OF DUMBED-DOWN 8.6 PPG MUD. -STAGE UP PUMPS IN 1/2 BBL INCREMENTS TO 4 BPM,325 PSI WATCH FOR PUMP EFFICIENCY DISCREPANCIES WHILE PUMPING 80 PPB PILL,NO DECREASE IN EFFICIENCY WHILE PUMPING PILL -FLOW CHECK WELL FOR 10 MINUTES TO ESTABLISH STATIC LOSS RATE=40 BBLS/HR MW IN/OUT=8.5 PPG(3%KCL) Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* North America-ALASKA-BP . Page 68 of 76 Operation Summary Report Common Well Name:V-08 ,AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. I BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To 1 Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) • (usft) 12:30 - 16:00 3.50 CLEAN N DPRB 14,049.00 PROD1 PUMP OUT OF THE HOLE AT 2 BPM FROM 12700'MD TO 9961'MD -PU=185 KLBS,SO=145 KLBS -PUMPING AT 2 BPM WITH 220 PSIAT 12700' MD -PUMPING AT 2 BPM WITH 175 PSI AT 10100' MD -CONSISTENT 45 BBUHR LOSSES WHILE PUMPING OUT OF THE HOLE -PU=185 KLBS,SO-145 KLBS SIMOPS:TEST CHOKE MANIFOLD VALVES#5, 6,8,3,4 AND 12 OFFLINE 16:00 - 16:30 0.50 CLEAN N DPRB 14,049.00 PROD1 FLOW CHECK INSIDE THE SHOE AT 9961'MD FOR 10 MINUTES.STATIC LOSS RATE=45 BBLS/HR.THIS STATIC LOSS RATE TO BE USED AS A BASELINE TO MONITOR HOLE FILL WHILE RIGGED UP TO THE IA VALVE AND WHEN TEST PLUG IS INSTALLED PER AGREED UPON PLAN FORWARD FOR WELL MONITORING DURING BOPE TEST WHILE ON LOSSES. 16:30 - 17:00 0.50 CLEAN P PROD1 ,RIG SERVICE SERVICE TOP DRIVE,BLOCKS AND RIG FLOOR EQUIPMENT 17:00 - 20:00 3.00 BOPSUR P PROD1 HANG OFF DRILLSTRING ESTABLISH WELL MONITORING PLAN FOR BOPE TEST PER BP RP"TESTING BOPE WHILE HANGING DRILL STRING WITH AN RHOT': -MAKE UP RHOT(7"HES RTTS WITH INTERNAL VALVE REMOVED)WITH PORTED SUB BELOW.RUN IN ONE STAND TO-50' BELOW WELLHEAD. -WITH RHOT ON DEPTH,BREAK CIRCULATION PE3R RP TO ENSURE CLEAR PORTS IN PORTED SUB. SET RHOT,DISENGAGE RUNNING TOOL, POOH AND LAYDOWN RUNNING TOOL. -PU=175 KLBS,SO=148 KLBS PRIOR TO SETTING RHOT -RIG UP PER AGREED UPON WELL MONITORING RIG UPAS FOLLOWS:2"HOSE WITH TEE,DUAL HIGH PRESSURE CHECK VALVES AND GAUGE TO DOUBLE IA ISOLATION VALVES WITH BLEEDER NEEDLE VALVE BELOW THE PRESSURE GAUGE. RIG UP SECONDARY KILL TO IA VALVE TO MAINTAIN HOLE FILL BELOW THE TEST PLUG &PIT WATCHER TO MONITOR HOLE FILL EVERY HALF HOUR RECORDING ON TREND SHEET -SIMOPS: RIG UP FOR BOPE TESTING- I MAKE UP TEST JOINT AND SURFACE TEST ASSEMBLIES 20:00 - 20:30 0.50 WHSUR P PROD1 PULL WEAR BUSHING 20:30 - 21:30 1.00 BOPSUR N HMAN 14,049.00 I PROD1 PREPARE FOR BOPE TESTING -SET TEST PLUG AND RELIZE INABILITY TO RUN IN LOCKDOWN SCREWS ON PLUG TYPE. PULL TEST PLUG. ELECT TO CALLOUT NEW HANG OFF SOLID BODY TEST PLUG. Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP I Page 69 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay ! Site:PB V Pad Rig Name/No.:PARKER 272 'Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 00:00 2.50 BOPSUR P 14,049.00 PROD1 CONTINUE TO PREPARE FOR BOPE TEST PER HANGOFF RP FLUSH STACK AND FUNCTION ELEMENTS WITH STACK WASHING TOOL MAKEUP AND RUN NEW TEST PLUG. RUN IN LOCKDOWN SCREWS PER FMC REP. ' -RUN IN HOLE WITH TEST JOINT. SIMOPS: CLEAN MUD PUMP#2(USED FOR LCM PUMPING). CLEAN PITS OF LCM AND IN PREPARATION FOR MUD NOTE: OBSERVE STATIC LOSS RATE I DECREASE FROM 45-50 BBLS/HR TO 30 BBLS/HR IN TREND BEFORE MIDNIGHT. SUSPECT RHOT MAY BE PARTIALLY PLUGGED OFF DOWNHOLE FROM POTENTIAL LCM DEBRIS REMAINING IN ' CIRCULATING SYSTEM 3/11/2017 00:00 02:30 2.50 BOPSUR N DPRB 14,049.00 PROD1 PULL TEST PLUG AND RUN IN HOLE AND RETRIEVE RHOT PER HALLIBURTON REP TO INSPECT PORTED SUB AND FLOW THROUGH ABILITY OF TOOL -DUE TO DECREASE IN STATIC LOSS RATE FROM 45-50 BBLS/HR TO 30 BBLS/HR, SUSPECT RHOT MAY BE PARTIALLY PLUGGED OFF RETRIEVE RHOT AND INSPECT PORTED SUB,NO APPARENT PLUGGING ISSUES I ! -PERFORM 10 MINUTE FLOW CHECK TO ESTABLISH NEW BASELINE STATIC LOSS RATE=30 BBLS/HR -MAKE UP RHOT,RUN IN HOLE ONE STAND AND RE-SET PER HALLIBURTON REP 02:30 - 03:30 1.00 BOPSUR N ' DPRB 14,049.00 PROD1 INSTALL NEW SOLID BODY STYLE FMC TEST PLUG PER FMC REP AND RUN IN LOCK DOWN SCREWS TO SECURE. 103:30 - 08:30 ! 5.00 BOPSUR P PROD1 PRESSURE TEST BOPE TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH FOLLOWING AOGCC REGULATIONS AND BP STANDARDS -AOGCC REP GUY COOK ON LOCATION TO ' WITNESS TEST -TEST WITH 2-7/8"AND 4-1/2"TEST JOINTS -TEST GAS ALARMS,PVT AND FLOW SHOW -ONE FAILURE: ACCUMULATOR AIR PUMP REGULATOR VALVE(CONTROLS SHUT-OFF)- CHANGE OUT AND RE-TEST(PASS) -FAIUPASS ON H2S SENSOR IN PIT ROOM -MAINTAIN CONTINUOUS MONITORING ON IA DURING TEST(25-30 BPH STATIC LOSS RATE, ' O PSI ON PRESSURE ON IA GAUGE) 08:30 - 09:00 1 0.50 BOPSUR P PROD1 RIG DOWN AFTER BOPE TESTING 09:00 - 09:30 I 0.50 WHSUR P PROD1 PULL TEST PLUG AND SET WEAR RING(ID= 7-1/8") -RUN IN LOCKDOWN SCREWS AND TORQUE GLAND NUTS 09:30 - 10:00 0.50 BOPSUR P PROD1 'SERVICE AND LUBRICATE RIG. Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 70 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. I BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 11:00 1.00 CLEAN P PROD1 PREPARE FOR UPCOMING OPERATIONS -CLEAN AND CLEAR RIG FLOOR -BREAK CROSSOVERS OFF OLD MOCS TOOL TO PREPARE FOR RUNNING NEW MOCS CIRC SUB -BREAKDOWN BAKER MWD TOOLS 11:00 - 11:30 0.50 BOPSUR P PROD1 PULL 7"HES RTTS HANG-OFF TOOL RUN IN HOLE WITH STAND OF DRILLPIPE AND RUNNING TOOL. MAKEUP TO RTTS AND RELEASE PACKER. PULL TO SURFACE. LAYDOWN PACKER AND RUNNING TOOL. 11:30 - 20:00 8.50 CLEAN N DPRB 14,049.00 PROD1 PULL OUT OF THE HOLE WITH 6-1/8" CLEANOUT ASSEMBLY FROM 7"SHOE AT 10141'MD TO BHAAT 102'MD FLOWCHECK WELLAT SHOE PRIOR TO PULLING=STATIC LOSS RATE=25-30 BPH -PUMP OUT AT 2 BPM,100-150 PSI,80 FPM FROM 7"SHOE TO 6000'MD -2 BPM,100-150 PSI,90 FPM FROM 6000'TO 5000'MD -2 BPM,100-150 PSI,100 FPM FROM 5000'TO 4000'MD -PULL ON ELEVATORS AT 50 FPM FROM 4000' 'TO 3000'MD -PULL ON ELEVATORS AT 100 FPM FROM 3000'MD TO SURFACE -OVERALL STATIC LOSS RATE FOR TRIP=37 BPH -RACK BACK 21 STANDS 4"DRILLPIPE IN SEGREGATED DERRICK LOCATION TO LAYDOWN OFFLINE FOR HARDBANDING. WILL NEED TO SINGLE IN WITH REPLACMENT JOINTS. ,20:00 - 20:30 0.50 CLEAN N DPRB 14,049.00 PROD1 LAYDOWN 6-1/8"CLEANOUT BHA FROM 102' MD TO SURFACE. -GRADE BIT=3-3 -FLOW CHECK WELL FOR 10 MINUTES AT 102'MD -STATIC LOSS RATE=45 BBLS/HR -CLEAN AND CLEAR RIG FLOOR 20:30 - 21:00 0.50 CLEAN N DPRB 14,049.00 PROD1 LUBRICATE RIG 21:00 - 00:00 3.00 STKOH N DPRB 14,049.00 PROD1 MAKE UP 6-1/8"RSS DRILLING ASSEMBLY !PER BAKER MWD/DD TO 220'MD i-T406FSX HCC PDC BIT,RSS,FLEX SUB, ONTRAK,BCPM,SDN,FILTER SUB,FLOAT SUB,CROSSOVER,MOCS CIRCULATION SUB, DRILL PIPE(5000'),JARS,DRILL PIPE TO SURFACE -REPLACED ALL SMART TOOLS WITH NEW TOOLS NEW NOV MOCS CIRCULATION SUB -OBSERVE INCREASE IN STATIC LOSS RATE =55 BBLS/HR 3/12/2017 00:00 - 00:30 0.50 STKOH N DPRB 14,049.00 PROD1 BEGIN NEW WELLBORE CONTINUE TO MAKE UP 6-1/8"RSS DRILLING ASSEMBLY PER BAKER MWD/DD TO 220'MD -PDC BIT,RSS,FLEX SUB,ONTRAK,BCPM, SDN,FILTER SUB,FLOAT SUB,CROSSOVER, MOCS CIRCULATION SUB,DRILL PIPE(5000'), JARS,DRILL PIPE TO SURFACE Printed 4/3/2017 9:51:51AM `AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 71 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) , Start Date:2/6/2017 End Date:3/15/2017 'X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM 'Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 04:00 2.50 STKOH N DPRB 14,049.00 PROD1 RUN IN HOLE ON ELEVATORS WITH 6-1/8" DRILLING BHA FROM 220'TO 2483'MD -PICK UP SINGLES FROM PIPE SHED TO REPLACE JOINTS LAID DOWN FOR HARDBANDING -FILL PIPE EVERY 2000'MD -SHALLOW HOLE TEST TOOLS AT 2483'MD: GOOD TEST -MUD WEIGHT IN/OUT=8.6 PPG(DUMBED DOWN MUD) STATIC LOSS RATE=25-35 BBLS/HR -NOTE:DAYLIGHT SAVINGS TIME,CLOCKS SHIFT ONE HOUR FORWARD 04:00 - 09:30 5.50 STKOH N DPRB 14,049.00 PROD1 'RUN IN HOLE ON ELEVATORS WITH 6-1/8" DRILLING BHA FROM 2483'MD TO 9950'MD I-FILL PIPE EVERY 2000'MD -MUD WEIGHT IN/OUT=8.6 PPG(DUMBED DOWN MUD) -STATIC LOSS RATE=25-35 BBLS/HR 09:30 - 11:00 1.50 STKOH P PROD1 SLIP AND CUT DRILLING LINE -CALIBRATE BLOCKS,AMPHION AND BAKER DEPTH TRACKER 11:00 - 11:30 0.50 STKOH N DPRB 14,049.00 PROD1 CIRCULATE AT THE SHOE BEFORE ENTERING OPEN HOLE -STAGE UP PUMPS SLOWLY TO 7 BPM IN 1/2 BBL INCREMENTS,1425 PSI -ROTATE 30 RPM WITH 4-5 KFT-LBS TORQUE TO CHECK MWD(FIRST SIGNS OF LITHOTRAK NOT COMMUNICATING WITH THE REST OF THE BHA COMPONENTS) -OBSERVE LOSS RATE INCREASE TO 270 BBLS/HR 11:30 - 12:30 1.00 STKOH N DPRB 14,049.00 PROD1 RUN IN HOLE ON ELEVATORS IN OPEN HOLE WITH 6-1/8"DRILLING BHA FROM 10140'MD TO 12313'MD -PU=200 KLBS,SO=130 KLBS -MONITOR DISPLACEMENT WITH TRIP TANK -STATIC LOSS RATE=25-35 BBLS/HR -RUN IN HOLE PER TRIPPING SCHEDULE IN I WELL PROGRAM 12:30 - 19:00 6.50 STKOH N DPRB 14,049.00 • PROD1 TRENCH HOLE PER BAKER DD FROM 12320' MD TO 12350'MD TO INITIATE OPEN HOLE SIDETRACK PER OCN#19 -220 GPM,1230 PSI -100 RPM,7 KFT-LBS TORQUE 1-DYNAMIC LOSS RATE=250-300 BBLS/HR (RUNNING WATER AT 40 BBLS/HR) -TAKE SLOW PUMP RATES AT 12350'MD (8856'TVD) -PUMP ONE DRILL AHEAD PILL WITH NO MAJOR IMPROVEMENT IN RETURNS -BAKER LITHOTRAK(SDN,DENSITY NEUTRON)TOOL NOT COMMUNICATING WITH OTHER COMPONENTS OF BHA. DISCUSSION WITH GEOLOGY RESULTED IN DECISION TO DRILL REMAINDER OF SECTION WITHOUT LOGS. -OBSERVE RIB PRESSURE INCREASE AND SLEEVE ROTATION INCREASE INDICATING GOOD KICK OFF FROM ORIGINAL WELLBORE -INITIAL INCLINATION=91.32°,FINAL INCLINATION=90.92° Printed 4/3/2017 9:51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 72 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 00:00 5.00 STKOH N DPRB 14,049.00 PROD1 TIME DRILL PER OPEN HOLE SIDETRACK PROCEDURE FROM OCN#19 AND PER BAKER DD FROM 12350'MD TO 12353'MD -PU=200 KLBS,SO=130 KLBS,ROT=160 KLBS -220 GPM,1060 PSI -100 RPM,6.5 KFT-LBS TORQUE -INITIAL DYNAMIC LOSS RATE=230 BBLS/HR -OBSERVE DYNAMIC LOSS RATE DECREASE TO 170 BBLS/HR TIME DRILL PER THE FOLLOWING SCHEDULE FROM OCN#19: 1900-2100 HRS:0.5 FT/HR 2100-2400 HRS:1 FT/HR INCLINATION CHANGES: @12350'MD:ORIGNAL=91.32°,SIDETRACK= 90.92° @12352'MD:ORIGINAL=91.32°,SIDETRACK =90.83° 3/13/2017 00:00 - 07:00 7.00 STKOH N DPRB 12,365 00 PROD1 TIME DRILL PER OPEN HOLE SIDETRACK PROCEDURE FROM OCN#19 AND PER BAKER DD FROM 12353'MD TO 12380'MD -PU=200 KLBS,SO=130 KLBS,ROT=160 KLBS -220 GPM,1060 PSI -100 RPM,6.5 KFT-LBS TORQUE -INITIAL DYNAMIC LOSS RATE=230 BBLS/HR -OBSERVE DYNAMIC LOSS RATE DECREASE TO 170 BBLS/HR -GOOD INDICATIONS OF SUCCESSFUL SIDETRACK PUMP(4)DRILLAHEAD PILLS AS DRILLING AHEAD,AND OBSERVE SOME RELIEF WITH DYNAMIC LOSS RATE TIME DRILL PER THE FOLLOWING SCHEDULE FROM OCN#19: 00:00-03:00 HRS:2 FT/HR 03:00-06:00 HRS:4 FT/HR 06:00-07:00 HRS:8 FT/HR INCLINATION CHANGES: @12350'MD:ORIGNAL=91.32°,SIDETRACK= 90.92° @12352'MD:ORIGINAL=91.32°,SIDETRACK =90.83° @12356'MD:ORIGINAL=91.49°,SIDETRACK =90.86° @12358'MD:ORIGINAL=91.58°,SIDETRACK =90.88° @12363'MD:ORIGINAL=91.67°,SIDETRACK 90.97° Printed 4/3/2017 9:51:51AM •All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 73 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 17:30 ' 10.50 STKOH N DPRB 12,365.00 PROD1 DIRECTIONAL DRILL DRILL 6-1/8" PRODUCTION HOLE FROM 12380'MD TO 12593'MD(8967'TVD)PER BAKER DO -240 GPM,1241 PSI ON BOTTOM,1230 PSI OFF BOTTOM i-120 RPM,8-11 KFT-LBS TORQUE ON BOTTOM,7-8 KFT-LBS TORQUE OFF 'BOTTOM,3-15 KLBS WOB -PU=200 KLBS,SO=130 KLBS,ROT=160 KLBS -MUD WEIGHT=8.6 PPG IN/OUT(DUMBED DOWN MUD) -TAKE SLOW PUMP RATES AT 12380'MD PUMP(5)40 PPB DRILLAHEAD PILLS 1-INCREASE FLOW RATE FROM 220-240 GPM AND OBSERVE INCREASE IN LOSS RATE -DYNAMIC LOSS RATE=150-175 BBLS/HR GOOD INDICATIONS OF SUCCESSFUL SIDETRACK CENTER TO CENTER SEPARATION: @ 12371'MD=2 FT @ 12435'MD=5 FT @ 12498'MD=12 FT @ 12592'MD=25 FT '17:30 - 18:00 0.50 STKOH N DPRB 12,365.00 PROD1 PUMP OUT OF THE HOLE FROM 12593'MD TO 12300'MD TO TEST THE SIDETRACK JUNCTION.SHUT DOWN PUMPS AND RUN IN HOLE ON ELEVATORS AND DRY DRIFT THROUGH SIDETRACK JUNCTION TO SIMULATE LINER RUN.SUCCESSFULLY RE-ENTER SIDETRACK WITH NO ISSUES OR DRAG NOTED. -PUMP AT 2 BBLS/MIN,440 PSI,PULLAT 60 FT/MIN -PU=190 KLBS,SO=140 KLBS -SET DOWN AND TAG BOTTOM ON DEPTH AT 12593'MD AFTER DRIFT 18:00 - 00:00 6.00 STKOH N DPRB 12,365.00 PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 12593'TO 12691'MD(8973'TVD) PER BAKER DD(98 FT IN 5.5 HRS=18 FT/HR WITH CONNECTIONS) -240 GPM,1290 PSI ON BOTTOM,1275 PSI OFF BOTTOM,120 RPM,11 KFT-LBS TORQUE ON BOTTOM,8.5 KFT-LBS TORQUE OFF BOTTOM,14 KLBS WOB -PU=195 KLBS,SO=135 KLBS,ROT=160 KLBS -MUD WEIGHT=8.6 PPG IN/OUT(DUMBED DOWN MUD) -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -DYNAMIC LOSS RATE=200 BBLS/HR -CENTER TO CENTER SEPARATION AT 12687' MD=36 FT Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths° • North America-ALASKA-BP 41111 Page 74 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/14/2017 00:00 - 12:00 12.00 STKOH N DPRB 12,365.00 PROD1 DIRECTIONAL DRILL6-1/8"PROD HOLE FROM 12691'TO 13384'MD IN 46P(SAD)FORMATION (693'IN 12 HRS=58 FPH WITH CONNECTIONS) -240 GPM,1380 PSI ON BOTTOM,1345 PSI OFF BOTTOM -120 RPM,13 KFT-LBS TORQUE ON BOTTOM, 10 KFT-LBS TORQUE OFF BOTTOM,12 KLBS WOB -PU=197 KLBS,SO=133 KLBS,ROT=161 KLBS -MW IN/OUT=8.6 PPG LOSSES:175-200 BPH WHILE DRILLING AHEAD -SURVEY EVERY JOINT(-30')FOR PLANNED DOGLEGS>5°/100'MD -NO BACKREAMING AT CONNECTIONS -TAKE SLOW PUMP RATES AT 12688'MD, 8973'TVD 1 -CENTER TO CENTER SEPARATION AT 12676' MD=100 FT 1-PUMP(5)40 BBL LCM DRILL AHEAD PILLLS AT:12980',13166',13258',13326',13368'MD 12:00 - 14:30 2.50 STKOH N DPRB 12,365.00 PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 13384'TO INTERVAL TD AT 13457' MD(8961'TVD)IN 46P(SAD)FORMATION(73' IN 2.5 HRS=30 FT/HR WITH CONNECTIONS) -240 GPM,1380 PSI ON BOTTOM,1360 PSI OFF BOTTOM -120 RPM,12 KFT-LBS TORQUE ON BOTTOM, 9 KFT-LBS TORQUE OFF BOTTOM,12 KLBS WOB -PU=195 KLBS,SO=135 KLBS,ROT=160 I KLBS -SURVEY EVERY 90 FT -MW IN/OUT=8.6 PPG -DYNAMIC LOSS RATE ON BOTTOM=200 BBLS/HR -STATIC LOSS RATE ON BOTTOM=5 BBLS/HR -TAKE SLOW PUMP RATES AT 13457'MD, 8961'TVD -NO BACKREAMING AT CONNECTIONS -TD WELL IN EILEEN. RE-ENTER UNINTENTIONALLY DUE TO UNEXPECTED FAULT(29'OPEN) -ACTUAL DRILLING TIME SINCE MIDNIGHT= 11 HOURS(70 FPH ON BOTTOM ROP) 14:30 - 18:30 4.00 STKOH P 12,365.00 PROD1 PERFORM WIPER TRIP FROM TD AT 13457' MD TO THE 7"SHOE AT 10141'MD -PUMP OUT OF THE HOLE WITH 6-1/8" DRILLING ASSEMBLY AT BPM 320 PSI,PULL AT 60 FT/MIN -PU=200 KLBS,SO=135 KLBS AT 13457'MD -PU=185 KLBS,SO=145 KLBS AT 10141'MD OBSERVE 30K OVERPULLAT 11640 FT MD. ABLE TO WIPE THROUGH WITH NO ISSUE. Printed 4/3/2017 9:51:51AM °AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 75 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 20:00 1.50 STKOH P 12,365.00 PROD1 CIRCULATE 1XBU(ACCOUNTING FOR LOSS RATE)AT THE 7"SHOE,10141'MD -FLOW CHECK FOR 10 MINUTES AND ESTABLISH STATIC LOSS RATE=10 BBLS/HR -STAGE UP PUMPS TO 240 GPM IN 1/2 BBL INCREMENTS,1230 PSI -DYNAMIC LOSS RATE AT THE SHOE=200 BBLS/HR,40%RETURNS 20:00 - 20:30 0.50 STKOH P PROD1 LUBRICATE RIG,SERVICE TOP DRIVE, CROWN AND RIG FLOOR EQUIPMENT 20:30 - 22:30 2.00 STKOH P 12,365.00 PROD1 RUN IN HOLE WITH 6-1/8"DRILLING ASSEMBLY ON ELEVATORS FROM THE SHOE AT 10140'MD TO TD AT 13457'MD -PULL AT 75 FT/MIN PU=200 KLBS,SO=135 KLBS AT 13457'MD -MONITOR DISPLACEMENT WITH TRIP TANK GOOD DISPLACEMENT -FILL PIPE EVERY 20 STANDS -20 KLBS DRAG ABOUT 200'ABOVE THE JUNCTION AT 12150'MD.ABLE TO SET WIPE THROUGH SECOND TIME WITH NO DRAG. -NO OTHER DRAG OR ISSUES RUNNING IN THE HOLE 22:30 - 23:30 1.00 STKOH P 12,365.00 PROD1 CIRCULATE AND CONDITION MUD AT 13457' MD FOR FINAL TRIP OUT OF THE HOLE -FLOW CHECK WELL ON BOTTOM FOR 10 MINUTES AND ESTABLISH STATIC LOSS RATE =0 BBLS/HR -STAGE UP PUMPS TO 6 BPM,1445 PSI -100 RPM,7 KFT-LBS TORQUE -DYNAMIC LOSS RATE=240 BBLS/HR,35% RETURNS 23:30 - 00.00 0.50 STKOH P 12,365.00 PROD1 PUMP OUT OF THE HOLE WITH 6-1/8" DRILLING ASSEMBLY FROM TD AT 13457'MD TO 12973'MD AT MIDNIGHT FOR FINAL TRIP OUT OF THE HOLE -PUMP AT 2 BPM 320 PSI,PULL AT 60 FT/MIN -PU=200 KLBS,SO=135 KLBS OFF BOTTOM -NO TIGHT SPOTS OR ISSUES IN OPENHOLE -MINIMAL STATIC LOSSES 3/15/2017 00:00 - 02:00 2.00 DRILL P PROD1 PUMP OUT OF THE HOLE FROM 12973'TO THE SHOE AT 10141'MD FOR FINAL TRIP OUT OF THE HOLE -PUMP AT 2 BPM 225 PSI,PULL AT 80 FT/MIN -PU=190 KLBS,SO=145 KLBS AT 10141'MD -NO TIGHT SPOTS OR ISSUES ON FINAL TRIP OUT OF THE HOLE -MINIMAL STATIC LOSSES 02:00 - 04:00 2.00 DRILL P PROD1 CIRCULATE 1XBU(ACCOUNTING FOR LOSS RATE)AT THE 7"SHOE(10141'MD) -FLOW CHECK FOR 10 MINUTES TO ESTABLISH STATIC LOSS RATE=5 BBLS/HR -PUMP AT 240 GPM,1145 PSI -120 RPM,6.5 KFT-LBS TORQUE -DYNAMIC LOSS RATE=200 BBLS/HR,40% RETURNS Printed 4/3/2017 9.51:51AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 76 of 76 Operation Summary Report Common Well Name:V-08 AFE No Event Type:DRL-ONSHORE(DON) Start Date:2/6/2017 End Date:3/15/2017 X3-017QH-C:(8,545,943.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:OOAM 'Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 09:00 5.00 DRILL P PROD1 PUMP OUT OF THE HOLE FROM THE SHOE AT 10141'MD -PUMP AT2 BPM 130 PSI,PULL AT 80 FT/MIN TO 6000'MD -PUMP AT2 BPM 115 PSI,PULL AT 90 FT/MIN TO 5000'MD 1 -PUMP AT 2 BPM 100 PSI,PULLAT 100 FT/MIN TO 4000'MD -PU=99 KLBS,SO=95 KLBS AT 5000'MD UNANNOUNCED KICK WHILE TRIPPING DRILL WITH FISCHER CREW+AAR 09:00 - 11:00 2.00 DRILL P PROD1 I PULL OUT OF THE HOLE ON ELEVATORS FROM 4000'MD TO SURFACE -PULL AT 50 FT/MIN FROM 4000'-3500'MD -PULL AT 100 FT/MIN FROM 3500'-SURFACE -MONITOR HOLE FILL WITH TRIP TANK: GOOD HOLE FILL -MONITOR WELL FOR 10 MINUTES:STATIC LOSS RATE=35 BBLS/HR 11:00 - 14:00 3.00 DRILL P PROD1 LAY DOWN 6-1/8"RSS DRILLING ASSEMBLY #10 PER BAKER MWD AND DD FROM 220'TO SURFACE -REMOVE SOURCE PER BAKER PROCEDURE RACK BACK HEAVY WEIGHT AND JARS -PLUG IN&DOWN LOAD TOOL,FUNCTION TEST MWD TOOLS FOR VERIFICATION OF ' INTEGRITY i -BIT GRADE:1-1 IN GAUGE i ' END DON EVENT AT 14:00 ON 3/15/17. BEGIN ' ! 'CON EVENT FOR RUNNING LINER, CEMENTING,PERFORATING AND RUNNING ' COMPLETION. I-13272'DRILLED IN 35.5 DAYS=26.7 DAYS PER 10K 37.6 DAYS(13.85 DAYS OVER 23.75 DAY AFE) -287.5 HOURS NPT(12 DAYS)-7"ACP ISSUES,PRODUCTION HOLE TOOL FAILURES PRODUCTION HOLE LOSSES,PRODUCTION HOLE REDRILL -$11.6MM(-$3.1MM OVER 8.55MM AFE) Printed 4/3/2017 9.51:51AM *AII depths reported in Drillers Depths* • • North America-ALASKA-BP Page 1 of 10 Operation Summary Report Common Well Name:V-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/15/2017 End Date:3/20/2017 X3-017QH-C:(2,876,865.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. ,BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/15/2017 14:00 - 15:00 1.00 CASING P RUNPRD RIG UP TO RUN 4-1/2"VAM HTTC LINER RIG UP DOYON CASING,POWER TONGS AND TORQUE TURN EQUIPMENT -CHANGE OUT ELEVATORS TO SLIP TYPE ELEVATORS -RIG UP FILL UP HOSE AND INSTALL AIR SLIPS -MAKE UP CROSSOVER TO SAFETY VALVE 15:00 - 18:00 3.00 CASING N HMAN 13,457.00 RUNPRD ADD SECOND CENTRALIZER TO JOINTS 1-75 -WAIT FOR CENTRALIZERS TO BE DELIVERED TO RIG FROM STORES 18:00 - 18:30 0.50 CASING P RUNPRD LUBRICATE RIG 18:30 - 00:00 5.50 CASING P RUNPRD RUN 70 JOINTS 4-1/2",12.6#,13CR,VAM HTTC LINER TO 3033'MD -BAKERLOK SHOE TRACK,CHECK FLOATS: GOOD -USE BEST-O-LIFE 4010 PIPE DOPE -TORQUE TURN CONNECTIONS TO 7830 FT-LBS RUN(2)FLOATING CENTRALIZERS ON JOINTS 1-75 -FILL CASING AND BREAK CIRCULATION - EVERY 10 JOINTS PU=70 KLBS,SO=70 KLBS AT 3033'MD -MONITOR DISPLACEMENT WITH TRIP TANK: GOOD DISPLACEMENT 3/16/2017 00:00 - 05:00 5.00 CASING P RUNPRD CONTINUE TO RUN 80 JOINTS 4-1/2",12.6#, 13CR,VAM HTTC LINER TO THE SHOE AT 10140'MD -PU=73 KLBS,SO=73 KLBS BEFORE MAKING UP LINER HANGER ASSEMBLY -MAKE UP LINER HANGER/PACKER :ASSEMBLY PER WEATHERFORD REP AND CONFIRM NUMBER OF SHEAR PINS IN LINER HANGER ASSEMBLY -CROSS OVER TO DRILL PIPE AT 3514'MD -USE BEST-O-LIFE 4010 PIPE DOPE ON VAM HTTC CONNECTIONS -TORQUE TURN HTTC CONNECTIONS TO 7830 FT-LBS -VAM AND SUMITOMO REPS ON LOCATION TO WITNESS LINER RUN -RUN(2)FLOATING CENTRALIZERS ON JOINTS 1-75 -FILL CASING AND BREAK CIRCULATION EVERY 10 JOINTS -PU=161 KLBS,SO=134 KLBS AT 10140'MD -MONITOR DISPLACEMENT WITH TRIP TANK: GOOD DISPLACEMENT Printed 4/3/2017 9:55:20AM `AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page2of10 Operation Summary Report Common Well Name.V-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/15/2017 End Date:3/20/2017 X3-017QH-C:(2,876,865.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 105:00 - 06:00 1.00 CASING P RUNPRD CIRCULATE 1.5X BOTTOMS UP AT THE SHOE I (10140'MD) -STAGE UP PUMPS SLOWLY IN 1 BBL INCREMENTS TO 5 BPM: -3 BPM=240 PSI 1-4 BPM=315 PSI 5 BPM=515 PSI I-OBTAIN BASELINE TORQUE VALUES: -10 RPM=4 KFT-LBS TORQUE 1 I -20 RPM=4-5 KFT-LBS TORQUE -DYNAMIC LOSS RATE=250 BBLS/HR,15% RETURNS 06:00 - 08:30 2.50 CASING P RUNPRD RUN 4-1/2"VAM HTTC LINER ON DRILLPIPE INTO OPEN HOLE FROM THE SHOE AT 10140' MD TO 13449'MD(6 FT OFF BOTTOM) j-RUN IN HOLE AT 70 FT/MIN,NO INDICATIONS 1 OF PUSHING FLUID AWAY -FILL CASING AND BREAK CIRCULATION EVERY 10 JOINTS OBTAIN PU/SO WEIGHTS EVERY 10 JOINTS -OBSERVED-20K DRAG ON LAST 3 STANDS IN THE HOLE;ABLE TO WIPE THROUGH WITH NO ISSUE I -PU=195 KLBS,135 KLBS AT 13425'MD I-MUD WEIGHT IN/OUT=8.6 PPG,STATIC ,LOSSES=MINIMAL I-MONITOR DISPLACEMENT WITH TRIP TANK GOOD DISPLACEMENT I -RIG UP WEATHERFORD TOP DRIVE CEMENTING HEAD AND MAKE UP TO SINGLE , IN MOUSE HOLE -ATTEMPT TO WASH DOWN TO BOTTOM AT 2 BPM AFTER BRINGING PUMPS ON SLOWLY , -TAG AT13553'MDAND ATTEMPT TOWORK DOWN TO TD WITH 45 KLBS DOWN,UNABLE TO WORK THROUGH Printed 4/3/2017 9:55:20AM *All depths reported in Drillers Depths* • North,America-ALASKA-BP • Page 3 of 10 Operation Summary Report Common Well Name:V-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/15/2017 End Date:3/20/2017 X3-017QH-C:(2,876,865.00) Project:Prudhoe Bay I Site:PB V Pad Rig Name/No.:PARKER 272 I Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 08:30 - 16:30 8.00 CASING P RUNPRD STAGE UP TO CEMENTING RATE IN 1/2 BBL INCREMENTS TO FINAL CIRCULATING RATE ' OF 5 BPM: INITIALLY ATTEMPT TO STAGE UP PUMPS OFF BOTTOM AND OBSERVE ERRATIC PRESSURE,INDICATING OBSTRUCTION ON THE BACKSIDE CAUSING PACKOFF: I 1-WORK PIPE 10'-30'TO ATTEMPT TO CLEAR ANNULUS OF OBSTRUCTION WHILE PUMPING AT VARIOUS RATES FROM 1-3 ' BBLS/MIN WITH NO RETURN FLOW VISIBLE ' AT THIS POINT IN THE POSSUM BELLY ' , -PIPE MOVEMENT WHILE CIRCULATING CAUSES PRESSURE TO INCREASE QUICKLY AND PACKOFF.NO OVERPULL OR EXCESSIVE DRAG WHILE WORKING PIPE, I FREE MOVEMENT. I ATTEMPT TO STAGE UP SLOWLY IN 1/2 BBL ' ' 'INCREMENTS TO 4 BPM WITH NO PIPE MOVEMENT.OBSERVE SOME ERRATIC I PRESSURE BEHAVIOR WHILE INITIALLY , STAGING UP TO NEW FLOW RATES.WAIT FOR PRESSURE TO STABALIZE BEFORE MOVING TO NEXT INCREMENTAL PRESSURE. ! CIRCULATING RATES AFTER STABLE HIGHER I THAN ANTICIPATED,INDICATING FLOW RESTRICTION STILL EXISTS UPHOLE.NO I I VISIBLE RETURN FLOW IN THE POSSUM BELLY DURING STAGE UP,HOLE STAYING FULL: -@1 BPM=210 PSI ' I -@ 1.5 BPM=260 PSI -@ 2 BPM=335 PSI -@2.5BPM=400PSI @ 3 BPM=525 PSI '-@ 3.5 BPM=575 PSI -@ 4 BPM=660 PSI AFTER PRESSURE STABLE,ATTEMPT TO ADD PIPE MOVEMENT WITH CIRCULATION. OBSERVE SAME PRESSURE BEHAVIOR, , BACKSIDE PACKING OFF WITH ANY TYPE OF I PIPE MOVEMENT.AFTER DISCUSSING WITH , TOWN,DECIDE TO STAGE UP SLOWLY TO 'FULL CIRCULATING RATE OF 5 BPM WITHOUT PIPE MOVEMENT IN PREPARATION FOR CEMENT JOB: -@ 2 BPM=340 PSI,160 BBL/HR DLR,0% RETURN FLOW -@ 3 BPM=530 PSI,180 BBL/HR DLR,0% RETURN FLOW -@ 4 BPM=740 PSI,200 BBL/HR DLR,15% RETURN FLOW -@ 5 BPM=975 PSI,240 BBL/HR DLR,20% RETURN FLOW Printed 4/3/2017 9:55:20AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 4 of 10 Operation Summary Report Common Well Name:V-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/15/2017 End Date:3/20/2017 X3-017QH-C:(2,876,865.00) Project:Prudhoe Bay i Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 18:30 2.00 CASING P RUNPRD RIG UP SCHLUMBERGER CEMENTERS,TEST LINES AND BATCH UP CEMENT ' BEGIN TO BATCH UP CEMENT,CONTINUE CIRCULATING WITH RIG PUMPS WHILE I I BATCH MIXING -CONFIRM CEMENTING DETAILS WITH 1 ANCHORAGE TEAM HOLD PREJOB SAFETY MEETING WITH RIG ' TEAM AND CEMENTERS.COMPLETE PRESSURE CROSSCHECK -PRESSURE TEST LINES WITH WATER TO 350 PSI LOW AND 4500 PSI HIGH FOR FIVE MIN EACH(PASSING TESTS PER LEAKTIGHT I CRITERIA) -MW IN/OUT=8.6 PPG 18:30 - 20:30 2.00 CASING P RUNPRD PERFORM 4-1/2"PRODUCTION HOLE LINER CEMENT JOB AS FOLLOWS: -PUMP 20 BBLS MUDPUSH II SPACER @ 5 BPM,780 PSI ICP,832 PSI FCP PUMP 200 BBLS(338 SACKS)OF 8.6 PPG I BIMODAL CEMENT(YIELD 3.33 CU.FT/SK). '-PUMP FIRST 95 BBLS @ 5 BPM,835 PSI ICP, i 1470 PSI FCP -REDUCE RATE FROM 5.1 BPM TO 4.4 BPM TO PUMP LAST 105 BBLS,MAINTAINING PRESSURE BELOW 1500 PSI TO PREVENT EARLY SET OF HANGER.1470 PSI ICP,1475 PSI FCP. 1 -152 BBLS LOST AFTER CEMENT ROUNDED ' SCORNER 1 -140 BBLS LOST AFTER CEMENT PAST JUNCTION ' -22%RETURNS,40 BBLS BACK AFTER I CEMENT PAST JUNCTION -FLUSH LINES TO ENSURE NO CEMENT ON TOP OF DART LAUNCH DART,GOOD INDICATION OF 'LAUNCHED DART FROM TATTLE TALE ON WEATHERFORD CEMENT HEAD PERFORM DISPLACEMENT WITH SCHLUMBERGER PUMPS: -SLB KICK OUT DART WITH 25 BBLS OF 8.6 PPG PERF PILL AT 5 BPM -PUMP 69.7 BBLS OF 8.6 PPG QUIKDRIL-N AT 5 BPM -REDUCE RATE TO 3 BPM PRIOR TO DART LATCH.OBSERVE LATCH AT 101.5 BBLS ' PUMPED AND 1430 PSI. -PUMP 42.5 BBLS OF 8.6 QUIKDRIL-N AT 5 , BPM -SLOW PUMPS TO 2 BPM AT 144 BBLS.PLUG BUMP AT 153.7 BBLS PUMPED.680 FCP. -TOTAL CALCULATED DISPLACEMENT VOLUME=152 BBLS -PRESSURE UP TO 1200 PSI,PRESSURE HOLDING.BLEED PRESSURE TO 0 PSI. MONITOR FOR 10 MIN(FLOATS HOLDING) -NO PIPE RECIPROCATION DURING JOB -CEMENT IN PLACE AT 20:30 3/16/2017 -FIELD PICK TOC WITH 40%HOLE WASHOUT =10650'MD Printed 4/3/2017 9:55:20AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 5 of 10 Operation Summary Report Common Well Name:V-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/15/2017 End Date:3/20/2017 X3-017QH-C:(2,876,865.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 21:30 1.00 CASING P RUNPRD SET LINER HANGER AND PACKER PER WEATHERFORD REP -PICK UP TO ENSURE THE LINER AND RUNNING STRING IS IN TENSION -INCREASE PRESSURE TO 2500 PSI TO SET HANGER -SET DOWN 50 KLBS TO CONFIRM HANGER `SETAND TO ENSURE RUNNING TOOL IS IN COMPRESSION -PRESSURE UP TO 3400 PSI TO SHEAR OUT RUNNING TOOL COLLET AND HOLD FOR 2 MINUTES THEN BLEED OFF -NEW PICK UP WEIGHT=177 KLBS, RUNNING TOOL RELEASED -PICK UP TO EXPOSE DOG SUB AND SET DOWN ON LINER TOP 55 KLBS TO SET PACKER 21:30 - 22:30 1.00 CASING P RUNPRD PICK UP TO REMOVE RSM PACKOFF AND CIRCULATE FLUIDS FROM LINER TOP -PRESSURE-UP TO 1500 PSI AND HOLD AS PULLING PACKOFF -CIRCULATE WELL CLEAN WITH 1X BU AT 10 BPM,1250 PSI PUMP NUT PLUG SWEEP -NO CEMENT OBSERVED OVER THE SHAKERS DURING CIRCULATION -OBSERVE-10 BBLS OF MUD PUSH OVER THE SHAKERS 22:30 - 23:00 0.50 CASING P RUNPRD LUBRICATE RIG 23:00 - 00:00 1.00 CASING P RUNPRD DISPLACE WELL TO 8.6 PPG BRINE -12 BBUMIN,2130 PSI 3/17/2017 00:00 - 01:00 1.00 CASING P RUNPRD DISPLACE FROM 8.5 PPG QUIKDRILL-N TO 8.5 PPG BRINE PER BAROID -12 BPM,2135 PSI 01:00 - 03:30 2.50 CASING P RUNPRD PULL OUT OF HOLE ON ELEVATORS FROM 9950'MD TO SURFACE AND LAY DOWN LINER RUNNING TOOL PER WEATHERFORD REP -MONITOR WELL FOR 10 MINUTES:STATIC -PU=175 KLBS,SO=140 KLBS AT 9950'MD 03:30 - 04:30 1.00 EVAL N DPRB 13,443.00 RUNPRD RIG UP DUTCH RISER AND QUICK TEST SUB -CLEAN AND CLEAR RIG FLOOR -RIG UP FOR PRESSURE CONTROL IF NEEDED DURING USIT LOG OPERATIONS 04:30 - 19:00 14.50 EVAL N DPRB 13,443.00 RUNPRD RIG UP SCHLUMBERGER E-LINE AND RUN USIT LOG TO EVALUATE QUALITY OF SECOND STAGE 7"CASING CEMENT JOB FOR ZONAL ISOLATION REQUIREMENTS RUN IN HOLE WITH USIT/MSIP/CCUGR TO 15400'MD -LOG FROM 5400'MD TO 9-5/8"SHOE -RIG DOWN E-LINE,RIG DOWN DUTCH RISER SYSTEM,CLEAN AND CLEAR RIG FLOOR 1-NO MICROANNULUS OBSERVED FROM LOGS,NO NEED TO APPLY PRESSURE TO RE-EVALUATE CEMENT QUALITY -SEE ATTACHED USIT CEMENT EVALUATION LOG SIMOPS:LAY DOWN STANDS OF 4"DP OFFLINE Printed 4/3/2017 9:55:20AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 6 of so Operation Summary Report Common Well Name:V-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/15/2017 End Date:3/20/2017 ,X3-017QH-C:(2,876,865.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 20:00 1.00 CASING P RUNPRD PRESSURE TEST 4-1/2"LINER AND LINER TOP PACKER TO 250 PSI LOW FOR 5 MINUTES,3500 PSI HIGH FOR 30 MINUTES -RECORD PRESSURE TEST WITH CHART RECORDER:PASSING TEST -25 PSI LOST IN FIRST 15 MINUTES,10 PSI LOST IN SECOND 15 MINUTES '-6 BBLS PUMPED TO PRESSURE UP,6 BBLS BLED BACK I BLOW DOWN CHOKE AND KILL LINE 20:00 - 20:30 0.50 CASING P RUNPRD 1 LUBRICATE RIG 20:30 - 22:00 1.50 PERF P OTHCMP RIG UP TO RUN 2-3/4"MILLENIUM PERF GUNS AND 2-7/8"PAC PIPE WITH HALLIBURTON —__ AND DOYON CASING 22:00 - 00:00 2.00 PERF P OTHCMP PICK UP 2-3/4"MILLENIUM PERF GUNS WITH MAXFIRE E-FIRING HEAD PER HALLIBURTON REP AND RUN IN HOLE TO 1620'MD I-2-3/4"BULL PLUG,1600'MILLENIUM GUNS AND SPACERS,SHROUD AND E-FIRING HEAD,DEBRIS SUB,XO TO 2-7/8"PAC,BAKER HYDRAULIC DISCONNECT -MONITOR DISPLACEMENT WITH TRIP TANK -- __ - GOOD DISPLACEMENT 3/18/2017 00:00 - 06:30 6.50 PERF I P OTHCMP I RUN IN THE HOLE WITH PERFORATING ASSEMBLY ON PAC PIPE FROM 1621'MD TO 3447'MD,AND ON DRILLPIPE FROM 3447'MD TO PBTD AT 13358'MD. -PU=61 KLBS,SO=61 KLBS AT 3447'MD RIG DOWN DOYON CASING AND RIG UP FOR RUNNING ON 4"DP -PU=182 KLBS,SO=135 KLBS AT 13358'MD -TAG LANDING COLLAR AT 13357'MD WITH 5 KLBS,PICK UP AND POSITION GUNS 1'OFF BOTTOM MONITOR DISPLACEMENT WITH TRIP TANK: GOOD DISPLACEMENT 06:30 - 07:30 1.00 PERF P OTHCMP PERFORATE WELLBORE PER HALLIBURTON ,REP -COMPLETE PRESSURE SEQUENCE TO FIRE GUNS -OBSERVE GOOD INDICATION OF GUNS FIRING,6 BBLS LOST TO FORMATION AFTER FIRING -INITIAL LOSS RATE=5 BPH PERF INTERVALS: 11778'-12120'MD 12623'-12655'MD 12700'-13286'MD 13316'-13357'MD Printed 4/3/2017 9:55:20AM `AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 7 of 10 ii'� .. Operation Summary Report Common Wet Name:V-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/15/2017 End Date:3/20/2017 X3-017QH-C:(2,876,865.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:30 - 15:00 7.50 PERF P OTHCMP PULL OUT OF THE HOLE WITH PERFORATION ASSEMBLY WITH 4"DRILLPIPE FROM 13358' MD TO 3450'MD(TOP OF PAC PIPE) -PUMP OUT OF THE HOLE FROM 13358'MD- 9970'MD(TOP OF LINER)AT 3 BPM 655 PSI, PULLING AT 90 FT/MIN -MONITOR WELL FOR 10 MINUTES AND MEASURE STATIC LOSS RATE=0 BPH -MONITOR HOLE FILL WITH TRIP TANK: GOOD HOLE FILL -PU=182 KLBS,SO=135 KLBS AT 13358'MD SIMOPS:LAYING DOWN STANDS OF DRILLPIPE OFFLINE WHILE PULLING OUT OF THE HOLE WITH PERF ASSEMBLY 15:00 - 15.30 0.50 PERF P OTHCMP RIG UP TO LAY DOWN 2-7/8"PAC PIPE AND SPENT PERF GUNS 15:30 - 17.30 2.00 PERF P OTHCMP LAY DOWN 2-7/8"PAC PIPE SINGLES FROM 3450'MD TO 1620'MD PU=60 KLBS,SO=60 KLBS -MONITOR HOLE FILL WITH TRIP TANK: GOOD HOLE FILL 17:30 - 21:30 4.00 PERF P OTHCMP .LAY DOWN SPENT 2-3/4"MILLENIUM PERF GUNS FROM 1620'MD TO SURFACE -LAY DOWN HYDRAULIC DISCONNECT AND MAXFIRE FIRING HEAD -GOOD INDICATIONS OF ALL GUNS FIRING -LAY DOWN PERF GUNS AS SINGLES TO THE PIPE SHED -MONITOR HOLE FILL WITH TRIP TANK: GOOD HOLE FILL 21:30 - 22:00 0.50 PERF P OTHCMP RIG DOWN PERFORATING TOOLS AND EQUIPMENT,CLEAN AND CLEAR RIG FLOOR 22:00 - 22:30 0.50 BOPSUR P RUNCMP PERFORM WEEKLY BOPE FUNCTION TEST: GOOD TEST 22:30 - 23:00 0.50 RUNCOM P RUNCMP LUBRICATE RIG 23:00 - 00:00 1.00 WHSUR P RUNCMP FLUSH BOPE STACK.PULL WEAR RING AND RIG UP TO RUN 4-1/2"COMPLETION STRING. RIG UP DOYON CASING. -MINOR DIFFICULTY ENGAGING WEAR RING DUE TO LOCK DOWN SCREWS BEING RUN IN TOO TIGHTLY DURING INSTALLATION 3/19/2017 00:00 - 01:30 1.50 WHSUR P RUNCMP PULL WEAR RING -COMPLETE RIGGING UP TO RUN COMPLETION Printed 4/3/2017 9.55.20AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 8 of 10 Operation Summary Report Common Well Name:V-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/15/2017 End Date:3/20/2017 X3-017QH-C:(2,876,865.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 15:00 13.50 RUNCOM P RUNCMP RUN 4-1/2"VAM TOP,12.6#COMPLETION TUBING FROM SURFACE TO TAG BASE OF 4-1/2"LINER TIEBACK RECEPTACLE AT 28'IN ON JOINT 229(9976'MD CALCULATED DEPTH) I-BAKERLOK ALL CONNECTIONS BELOW TNT PACKER -USE JET LUBE SEAL GUARD PIPE DOPE ON ALL OTHER CONNECTIONS -TORQUE CONNECTIONS TO 4440 FT-LBS INSPECT ALL THREADS PER ONSITE VAM THREAD REP MONITOR DISPLACEMENT WITH TRIP TANK: GOOD DISPLACEMENT,0-5 BPH LOSSES -RUNNING SPEED=90 FT/MIN NO SIGN OF TOP OF LINER WHILE RUNNING IN THE HOLE SIMOPS:LAYING DOWN STANDS OF 4" DRILLPIPE OFFLINE. ALL PIPE LAID DOWN OFFLINE PRIOR TO LANDING TUBING. 15:00 - 16:30 1.50 RUNCOM P 1 RUNCMP SPACE OUT AND LAND 4-1/2"VAM TOP COMPLETION AS FOLLOWS: -LAY DOWN JOINTS 229,228 AND 227 -RUN 9.44'AND 8.21'SPACEOUT PUPS+ JOINT 227+3.43'HANGER ASSEMBLY+42.55' RKB TO LAND COMPLETION AT 9970.63'MD -WLEG LANDED 6'INSIDE TIEBACK RECEPTACLE,5'UP FROM BASE OF RECEPTACLE -FINAL PU=142 KLBS,SO=120 KLBS -FMC REP ON LOCATION TO RUN IN AND TORQUE LOCK DOWN SCREWS AND GLAND NUTS 16:30 - 18:30 2.00 RUNCOM P RUNCMP DISPLACE WELL OVER TO NEW 120 DEGF 9.1 PPG NACL COMPLETION FLUID AS FOLLOWS: -REVERSE IN 175 BBLS BRINE AT 4 BPM,520 PSI REVERSE IN 123 BBLS CORROSION-INHIBITED BRINE AT 4 BPM,610 PSI TO PLACE BETWEEN UPPER GLM AT 3251'MD AND PACKER AT 9848'MD -REVERSE IN 61 BBLS BRINE AT 4 BPM,690 PSI -REVERSE IN EXTRA 5 BBLS,SWAP OVER TO TUBING AND CIRCULATE 5 BBLS TO WASH OFF RHC PROFILE AND MOVE FLUIDS BACK INTO PLACE 18:30 - 19:00 0.50 RUNCOM P RUNCMP MAKE UP LANDING JOINT AND DROP BALL AND ROD.ALLOW TO DROP-15 MINUTES. PULL AND LAY DOWN LANDING JOINT Printed 4/3/2017 9:55:20AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 9 of Yo Operation Summary Report Common Well Name:V-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/15/2017 End Date:3/20/2017 X3-017QH-C:(2,876,865.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB @97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 21:00 2.00 RUNCOM P RUNCMP PRESSURE TEST TUBING AND IA TO 250 PSI LOW FOR FIVE MINUTES AND 3500 PSI FOR '30 MINUTES AS FOLLOWS: -SET PRODUCTION PACKER DURING TUBING PRESSURE UP -TUBING TEST RESULT=LOSE 65 PSI IN FIRST 15 MINUTES,15 PSI IN SECOND 15 MINUTES -BLEED TUBING PRESSURE BACK TO 2000 PSI FOR IA TEST -IA TEST RESULT=LOSE 5 PSI IN FIRST 15 MINUTES,0 PSI IN SECOND 15 MINUTES I-BLEED IA TO 0 PSI,BLEED TUBING TO 0 PSI. OBTAIN APPROVAL TO PROCEED FROM ACTING WSUP -PRESSURE UP TUBING TO 2000 PSI,IA TO 3500 PSI -SEE ATTACHED DOCUMENTATION 21:00 - 21:30 0.50 RUNCOM ` P RUNCMP BLEED OFF TUBING SIDE FROM 2000 PSI TO 0 PSI QUICKLY TO SHEAR GLV IN GLM#9 AT 3251'MD -CIRCULATE 2 BBLS DOWN TUBING;2.5 BPM =660 PSI CIRCULATE 2 BBLS DOWN IA;2.5 BPM=540 PSI 21:30 - 22:00 0.50 RUNCOM P RUNCMP SERVICE PIPE CAT AND RIG FLOOR EQUIPMENT 22:00 - 00:00 2.00 RUNCOM P RUNCMP RIG UP AND REVERSE IN 78 BBLS 90 DEGF 6.8 PPG DIESEL WITH FREEZE PROTECT PUMP;2.5 BPM,1300 PSI ICP,900 PSI FCP -LINE UP AND ALLOW DIESEL TO U-TUBE TO TUBING SIDE TO FREEZE PROTECT TUBING AND IA TO 2296'MD,2200'TVD,35 BBLS IN TUBING,43 BBLS IN IA --110 PSI OVERBALANCED WITH DIESEL IN WELL TO IVISHAKAT 8961'TVD(8.3 PPG EMW) 3/20/2017 00:00 - 01:00 1.00 WHSUR P RUNCMP INSTALL TWC WITH T-BAR PER FMC 01:00 - 02:00 1.00 WHSUR P RUNCMP PRESSURE TEST TWC FROM ABOVE AND BELOW TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES EACH:GOOD D TE ST 02:00 - 05:00 3.00 BOPSUB P RUNCMP NIPPLE DOWN BOPE -DRAIN STACK,BLOW DOWN MUD LINES AND SERVICE LINES -REMOVE TURN BUCKLES AND HOLE FILL LINES.REMOVE BELL NIPPLE,BREAK BOLTS ON STACK AND RACK BACK ON STUMP. BREAK BOLTS ON RISER AND LAY DOWN INTO PIPE SHED. Printed 4/3/2017 9:55:20AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 10 of 10 Operation Summary Report Common Well Name:V-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/15/2017 End Date:3/20/2017 X3-017QH-C:(2,876,865.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/8/2017 2:00:00AM Rig Release:3/20/2017 Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:V-08 ACTUAL RKB©97.95usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 09:00 4.00 WHSUR P RUNCMP NIPPLE UP FMC 11"X 4"TUBING HEAD ADAPTER AND DOUBLE MASTER 4-1/8"GATE VALVE DRY HOLE TREE -NIPPLE UP ADAPTER FLANGE AND TREE ON WELLHEAD -TEST ADAPTER TO 250 PSI LOW FOR FIVE MIN AND 4500 PSI HIGH FOR 15 MIN;GOOD TEST APPROVED BY WSUP. SEE ATTACHED CHART. SIMOPS: -GENERAL RIG DOWN OPERATIONS PREP MUD MODULE FOR RIG MOVE I-CHECK TIRES AND MOVING SYSTEM -BRIDLE UP TO LAY MAST OVER 09:00 - 10:00 1.00 WHSUR P RUNCMP FILL TREE WITH DIESEL AND PRESSURE TEST 250/4500 PSI FOR 5 MIN;VISUAL LEAK TIGHT. GOOD TEST. 10:00 - 12:00 2.00 WHSUR P RUNCMP CLEAN AND SECURE CELLAR AND TREE AND PREP FOR RIG MOVE -CLEAN OUT CELLAR BOX AND WIPE DOWN TREE PRIOR TO RDMO TO NK-14B BLEED OFF GAS FROM OA IN 3 MIN DOWN TO 0 PSI. FINAL T/I/O=0/0/0 PSI SIMOPS: -CONTINUE WITH GENERAL RIG DOWN OPERATIONS -SECURE PIPE IN PIPE SHED -SKID RIG FLOOR TO MOVING POSITION -COMPLETE WORK ON DERRICK HOUSE HEATER RELEASE FROM V-08 AT 12:00 HRS ON 3/20/2017 Printed 4/3/2017 9:55:20AM `AII depths reported in Drillers Depths" • • IPlin ,.ao W g Wt's MZ mQ= a m Q t J 0 Q a I w I.) W U L C) El 0-, Q03 a m co C Cl) N 0.0 t s a a m a, 0 'a 00 CO N N �•_ co Zaa » � o LL N _ • CO ■ I 1 ►� Z �W0 z o m m ill�0 r co m O O CO ajj O • mco N O N N • W n Y CDU) O NA W V) ao � asa � � z O cZa (0 ( N r ❑ .0 `O 0) rn 0 d t @ @aa J J Z a) jCC CY 75 U 0 a -J a� I O co D U E co a`) , a) > Q Q g a to 5 rn d 3 1I ro co a )_ g c m 0) a a) 0 0 ` C a1 C C N r 'O I I m y J J .. '.. N > 6 7O 1 U U 'O ._ C o L J J Q L Lo w a) O) N Ec re c F d c O N C 2'• . V _N E L V O .- W . m O u) w LL O w Fy a) 0 y .E )n c U a a, re a a) m rn o o n C io m L d .0 a1 N O O U o J F• Z (A OHO) O O N- O O' 7 Q M O O O T D) aJ O ^ O O t co (0 M Co Q m CD N Q. m O t0 Q CL o Q COEl 2 Z D as (I) 0 �o I p 3 o C E 0 a) W y O O H CO N cocm) 1 O A C c d O Z W co t' H L at o e d c Z W c) (R .. O N -y O 0 J ? 7 O Q F- /- 0 U co Q co Lo I I Nr p Q � m N ' CO co .... o W N 0 N O v m NJ m x v d o m _ ❑ m m p E CL c N 4p a O ') tom/) N N ' .0 ...0.. V N o L a CO- m m > CO 0 0 : Q N al O O O N >-, a Y Y o 0 o co 0 as o Q Q ~ 0 0 m m N N y O N N J o � > > a m E m go 0 Q U N a a > CO CO Z a co 2 O O 00 O 9 m m o , - m a < 0 O a n > s Z m.o _ _ m m y 2 Q O 0_ 03 CO ❑ Z m m W 21:0 ° Q °OQ Z CO + + 0/�� Z a a > > > . . C C..).L. L c a) O �o ii E o c o c in LO 5.. .. m N 7 C r .N ❑ ` U O u) N N C C cm a o) ai ori ao �° a° ° ao ? o OE 'o d d d o A d ro °) o g )T d c d a d r f Ua 6g o a 202 u) u) u_ a 3 3 a 3 2 0 a > > N • ON-N- m O CO O CO co l0 V (0 O1:0 IIIO O CO N M CO l0 C) 0) V N O 0) M co co ,.� O O O O N M O M 0) M M V lD M (D O O N N N CO V l0 l0 CO CD N- CO � W d CO o C) a Ci.. N CO D3 Ncn Y Y 0) ( 6 CU O M N CO N- N C. CO 0) CO CO CO V 0) O CO Q CL CL CL .- O CO V C. O CO O V ( C. V N D 0) l0 LO C. O) CO U O O O O ,- Ni <- O O O O O O O .- Ni M V o > >Z x U m 0) Q 7 d O J O 001 V r.--0) 0 O V it CO CO Y Y 7 Y CC CC m w J J N O N N CO 0) VN CD CO O CO N OD CO (D CD 0) CO V CO N- V CO V N N 0 CO N M N O N 0) Q Q Z Q 7 _0) O CO CO N C. N- CO V O V CO CO CO C co F H O Y 00 Di 0i of of CD of ri (0 ri vi N v N- Ni ri CO CO CD CD CO Cfl CO CD CO V V M N N N a- O O 0 0 E CD 0) (o co CD 00 (O CO (D (0 (D CD CO (0 CO (D CD (O CO (O Q Q •E0 arnrnCDrn0) 0) CCmCDCD0) 0) 0) 0) 0) CD0) 0)N f07C000COCnCO (OCOCOCDCO CnCOCOCOCO CnCOCON O O 7 Cr j C 1 W W O CO C- V CO co O M (O N V V O N N O CO CO N- CO CO CD CD O N- n N N- CD CO 01 N C- CO N- V CO N V m N O CO V CA C. N N U C- C` N- OD O M CD N M CO O N- V CD .- O N M C 'C p) M M CO CO V V CD u-) coCD CD N- C- CO OD 00 O d p C 0) 0) W W 0) O W W W 01 0) 0) CA 0) 01 0) O E. N To To -0 L cg C) 0) W W CA 0) 0) 0) 0) 0) D) CA CA 0) 0) 0) 0) O w N Iii W N L' .N7.. CD CD co O CD CD CO CO CO co CO CD co CD CO co co CD N- d _ _ _ = O W 0) 0) W W W 0) 0) 0) W O) 0) O 0) W W 0) y C 0 0 0 0 1 Z N CO CO CD N CO CO CO CO CO LO- CO N CO CO CD N If) m - co O_ O_ O O 'i CC7 oy o O 0) CO CO N- O N- CO _ N N. M O O C)pO ddw -cc -cc WONOOO OONAN (OO 0 (0 MN W (C) O) d) O O O CO O O M O . C)oNU _ .a' .� .�0 � Ol . N N CO V V V LO CO CD CY w > d C co C U) CO co Lf '' m J 2 UO 2 • E 2 2 2 W c + C + + + Cv cc 13 cc CZ' cc1 O 1.12 CL N CL U CL I Q O. 3 + C + + + Oa- .- N- r) aD (D O) V0 CO N- CO CD aD V 0) Q U ❑ ❑ ❑ ❑ O O N O N. N (D 0) V C. W r---. V N CO CD N CO 4) N O ` OO O O NiCD O CU co O N CA C- CU O CD CD 0 >� .- .- N N N M V V V CD CD CL o N H m z 7 D _U) < U U U C LL O M CO CO CD N N CO 0) N m O a- .- N co CO (/) 6 6 6N N N CD 0) V C. O O V 0) co V N N- M N Cr) 2 co 2 2 2 O ri C- ri 0i V N CCJ Cn Oi ri N- Oi CCJ CCi ri M N ❑❑ CL' a + + CO (O CD N V V M W N N CO W V OD CD 1) E > CL > CL CL CL to N M O O O O (O a0 (O D d) O D R ❑ N Q. Z , o c ❑ ❑ ❑ I 7 $> > — 020222 1 CD N CD CO N. C. CO V C� CO CD (D CO C. N CO CO CO IL CL r C. C. CD CO V CD CO 0) V CO CD M CO N CD CL CL CD CO O CO H CO CO C- N O CO r f- CD N V D) CO CO CD O CL CCL IL V CO CD CO CD V V O M 0) NO/ .- CO C)) M CD CD 00 . CD > a- N CO V CO CD O CO N- CO 0) 0) O CO O v "6-2 Si v v . I v (o 0o N N N M ❑ O 000 ❑ Y O N a- CO N- C. C. N- N M V N C. CO co C. N- O N M N 0) 0) N CD N CO CO N O CD N CO O O N N N- N- N- N- N- O) N CD O O O O CD N N Y co Y j L CD CO N O 0000 C) ,- ,.-- NN NN jp f- N . co co M M M M CO CO CO M M M CO M M a O O o O Z Q i E _ T 2 T Z S = CO (L r 5 O m 0 m co co ;° co - O >, (0 (0 (0 (0 (0 (0 Q N d CL CL CL CL CL CL O ?. N N CD N N N I U) N 7 0 0 0 0 0 0 O CD M 0) 0) CD 0) C) (O O O V CD C- C) V C)0) • Q co co > > > > > > O N CD V 0) C` N.- M CD O CD 0 N CD CD V N QS CO00 OD C. CO CD M O O O O M CD CO (D O CD co co co r N O M (C A W N N CO V (O '. U T 0 V O C ,- CO U C(0 ,' CO CO CO CO 0 1-) CO .O F N a- N N C) C O O E• d N Cil m t U > CO CO CO O ` Cn 0 0 0 Z CL [L Ln N W CO N CO N LO CD N CO C) M C. a- a- O CD CD CD Q Q E N. N. CD 0) CO .- CON CD CO V N- ,- N O O CO CO co r--: v o OD CO N- ((i N- CO o V co O) ri (o o CD r o is /�� ` D) co W a- CO V CO CD CD CO V V .- CO W N N CD CD V 0) CD i[ f} i37 E N N O O N M V CO (O CO (O C- co C71 p1 0) O O 2 L O w O 41 6D ,� .. 0.T u = T f = N. 413 �a d U O C 0 YI E• O r d d d 7 ✓ a in33a w t = co . y O CO O O N- N CO1n U) COCO CD O O N coV' N N- CO N 0) O CO m W 0 0) O 0 0) m N o oa O D CO OD CO IIV(O V' CO CO N M (D O I- N CO O O a0 N- CD CD CD O 6 O O CD W O O N co CD CO CD OD O N V OD CD O CO N- LO r OD O N CO N N N CO CO CO CO V' V' V' co CD CD CD CD CD IN N. IN N - `W; m N H 7 = N N O a N N � Me CD CD Y Y � CU CO (D COO D) M CD CD COO O V' V N- CO CO I-- N N (D O Cn CD N (O CD d a d V' CD CD V' CO O CO O CD M r N- Cn CD CO 01 V' O CD M .- CO V' IN (D N L U CD (O N N O O N6 O O O O NO O O r O N CD C[) 66 V' O o co> Z i' C) m 6 Q y 7 J 0 rn rn 0 G V CO CO m a Y Y n co CC CC o n _ J J N N CU CD O CD CO O 0 CO CD CO CO CD CD N- V cl. O CO CO CO L CO CD Z Q co co N CD CO CD 0) N O N 'C O CO CO CO CO COM CO V' CV CD O N CD N Q Q � m V- o aD .- o O o M � .4- 0) v CO in O0 v r` rn s- N o in m tom D ) 0 ' CO N CD O M O W N- CO I- N N. N CD (O r o O M CD (O (O (D N O O co H H Y O O CO N- N. CD CO O CD CD V- (N O N. V' CD CO CO O 0) CO IN (D CD V• O U Q E 6 C CD co (D CD co (D CD co V V V' V V: V' CO CO CO N N N N .- .- s- > Q Q e 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - E. N C7 0 0 0) 01 0) 0) 0) 0 01 0 0 0 0 CD0 0) 01 0 0 0 0 0 CCC) 0 0 co _ (D co (D co co co co 66666 (D ID iD (D (D 66666 66666 > > ` � ww N- N. V' O CO CO O) (N Cf) O O V CO O CO N- CD O CO CO CD V 0) N CO N CO co co CD N- CO N- O CO O O d' N- CO LC) 01 LO - CO CO CO CO CO CO I- V' V' O co co s- co O N V' V' CO IN O O 0) N V' CD N O CO CD V CD CD G) O LO N O OD lD O OD (D CD N 'C O O M N- I- N. M CO in 6 V' O (.) L O) O N co co co co O co CO CO 0) V N- 01 N CD OCD CD r CO O O N C O C: 00 00000 .- ,- ,- .- - N N N N CO COCOV V' V' V. V' ID CD CD a)) L L e O O O O O O O O o O O O O O O O O O O O O O O O O O O r N 3 0) 0) O 0) 0) O O) O 01 0) O 01 O O O CD O O 0) O 0) N. O O CC CCC) zZ CD lD CD CD lD tD CD lD CD CD CD CD CD CD CD CD lD CD CD CD CD CD N CA tD CD CD li N O d r O U N co O O CO CO O 1--- O V' CD O N IN CD CO V' CO CO CO CD▪ CC :1_, V CD D co O (D N. co O N CD CD CO N O co co 1--- V CO N CO V 7 O CO .1. CD ` R O D O 0 O O CO D CO CO O CO O I- D N O O D O O CO N� N 0 N CO CO CO 0) O N V = O N CO CO CO N- O N to CD N- CO O o( a) w a) CN NNNNMCOMd• V N na) .c a o C 2 2 J m z N o o a) .- N- N CO O CO CO O N CD N- v N N- O O CO O (D CO N- CD CD 0. CD N. N IN O N CO N CD O CO V CD N O CD N N. O O CD CO CO N N CO CO CO N O V' N O O N- O (O (D CD lD V' V' V (D O CO (D N OD O I N. IN CO O CO V' N- O N V' LO N- O CO CD O N CD (O M V' CD N. I- O s- .- N N N N N CO CO CO CO V' V' V' LO LO CD Cn CD CD (D CL N u) v m 2 2 CO C L.L N- N CD V' N CO a0 CD O co V O CDr O CD CO CD CO CO O OD CD O CO CD N N .- CO O CO O N CO N CO CO IN CO O .- .- CD V' V' co O CO O N CO N CO CO N- 'C r CO CD CO 4 O V O V' O (D O N- 'C .- O CO OD V' N- O CO V' CO N .- CO O V' CO N O CO IN CD V' N CD OD in O _ _ N N CO V (D_ CO (O CD I. CO 0) O O .- N CO V' (D (I ((j (j W M N N N N N N N N N N N N a D N r r r r r 2. N N- O N- CO CO O LO co O V' O CO CD N CD .- _ O CO CO CO O LO V' CO CO V' N O (D O COO N CO CD N N N- n N O L001 .7 N O CD N O O O (D in O (D CO N CO N r N OD M I- CD N O O CO I� .- V' N O CD V' CO N O CD OcOV' N CD coo co V' N- N N N CO CO V CO CD IN N- I- co O O - N M Cr CD N co co co co CO , C_' — — ,- — — .- ,- — .- — — .- — — N N N N N N N N N N N N N 7 N N- CON COCOCO COCVNICNCV COVO O CD ,- LOCD V. V. - O CD CD V NUI CD O O O CO O N N NO) O COCD CD O O M V' V- CD O O N V• O O O O N N N O O O O O O CD CD 4 CO O O O O N N M L ,- N N N N N N .- .- .- CV CO CO CO CO CO CO CO CO CO CO CO CO 01 CO M CO CO CO CO M CO CO M CO CO M co E __ Ti C)co - Cl -. m .N 1 a 0) o O co N- M N O CO N- o CD V' CO V' V' N- CD O CD O Cr V' CO N- V' CO Q N CO .- CD CO CD 0 O O N. V' O 7 N CD CD N- CO O N- 'C CO V. CO QCD IN CO OD O O V' CO 'C 4 V CO CD (D CD CD CD CD N O r M V d• M r- .- .- = N N NNICNOJCV N N N N N CNN N N N co co co co CO 3T „ _ CD Cn E N N m m = L d d d r -0 CO co co O ` in O O O Z d I1 > > > N O N CO CO O O V' O CO CO CD O N CD CD CD O V •,- CO CO CO CO a = up GOV 001N- O M O O N M V. O M ,- O COCDCV OM CD OD O = 7 CO O V O 'C O V' OD CO N. (O O CD O CO V M O D W CV CCU CV CO CO CO CO CD C coco O O O CO OD CO I' CO (D O N CD O O M CD (y.'G) N N N M M (0 in co N. co O O O .- N CO V' lD co co f� I- I� CO co CD N CNN N N N N N N N N N N LO e � ; N ♦ CO0. g V 0 C >. E 2 a) m y 3 ‘-- 1r044421' ♦ U d a) 0 Cl) N CO f_ • m . -1 O N CO COCrCD N. O CD O O N 0) CO CO CO x- N. N N V' Cr CO N CO W .- CO CO CD O N N O O CO v 0) O CO CD CD O N O) O V V CO x- 03 (O M M CO CO O CO O) M N O (O M CD N. O �t coO N V n V a NM f� N- D) 7 O CO O (O I- N CO COM CO M O V O V O CO O CO I- N. (O O O O O N N M M 7 V CO CO (O n !n (O O m V 1ill 110,I, <n N r r r r r r r r r 7 O 41 N N LO CO - C/) N N N .- - CO V N. CO O) O N O CD N CO O N CO V V V CO O CO 0. Il D. CO Cn CO CO CO O .- 0 CO x- CO = CO V x- N O M ,- N r r U ,- ,- ,- •- N ,- O O O O ,- •- O O O O O O O O O O O O o D o) Z Com' U LO LO QN CD O y 7 J 0 �C (0)�,00 ❑ G V V cc m m Y Y 7 Y _I• J N CO I� O O W M CO Cn N CO O CO M O M CO r [O M CO C1D CO N V J J @ N- coN (D CO O O M CO V V O CO M N- M OD CO CO O Q Q ¢ • O co CO co O N V CD r CO N O CD O CO M O O M = N 0 ' CO CO CC) Lc)CC) 47 6i (U O O DCCNCDDC V O N CO O Ni CO O Mai V N N IN CO CD CO N CO V O CD N O) CO CO V O N M O CO N O Q Q E In > 7 x- ` O O CO C) O CO CO W N. IN CO CD CO N CO CO Cr 7 V M CO Q Q D C NW0mOO 7 QDi 0 0 ODA O) A A O O Oco- O O co- ODiD0 N Qi Q) rn Ommro (D mmC0CDm maomCnao maommm CO CO CO COO COCnCOOCO COCOCOCOO COCOCOCOO COCOCOCONN O co C •> > I- 2 W w .� N CO CO O CO CO CO N N N. DO N CO CO CO O O nCONWM CO Y CO O CO CD O O CD OCO N O N CO O IN V 01 7 Cr Cr) CD CO M CD N x- CO CO N .N N- I. O CO .- CO CD N 7 CO N V a) IN O O O O N M M M M N V N O) N CO (` O O N CO N O N CO C) -. () N CO CO CD CO C7) M N CO CD CO N. N CO O V CA CO N CO O V C 0 C _ CO CO CO N CD CD CD N IN CO CO CO C) CA O_ O N N CO_ CO Cr V d t L e O o O O O O O O O O O O O O w d Y 7 CO pCO N �j 0)N D7 CD CO D) CO C) N. W W CO O) m 0)) ON. ff) CD CO W Off) On) 0)) 0 0) CD Z CO CO CO In CO CO Cn N lO CO to Cn tO CO tO CO CO Cn Cn in CO CO Cn In N O C O R d ' V U Vy 7 D) CO •- OO M O) O N N N CO O I. N. CO CD N CO O CO CO CO N O CO C O CD CD N- M O) N (O N O N N M N M N N- W O V N r-- O CO 9 , a) w C0 CO V V CJ CO (7 D) OD CO CO CO 7 C7 CO C7 CO N V [7 6 •- N V 00 N M co CO CO N O O M N CO CO CO CD O M N- O V CO CO CO N T CO In CO LC) CO CD CO CO I. I. CO CO CO O O O O O N N N M cu 0- CeN L N J F rL Z (/) ❑ W 7 -t O CO CO .- M CO CO W O) N O CO 4 IN CD N CO r r- CO CO CO O CO O_ N. CO V N- V N O O Cr N N- CO CO V CO CO CO CO 7 O 0 CO V O) N CO D) O CO O N V V V CO V N O M CO O N 4 CD O N V N- O M CC O r 0 M CO N CO O V CO N CO CO D) M CO N CD O CO 01 CO CO N CO CD O CO CO N N CO CO CO D) O O O O N N M CO CO d' V CO CLI CO 0 m C ll O CD CO 'Cr Ie. N CO MN. COCO O CO0 x- CO O CD O N IN CO a N O Cr CO V 0 x- N N. I. CO CO CO O r N N CO N CO O CO V IN CO ✓ O O N N V (O N O CO V CO CO CD N O 7 O CO 7 O CD N co in CO N N CD R N O N CO N O CO CD M O CO 7 N CO N 0 N O N CO In CD (O CO I. CO O CO O ,- N N CO V In LO (O N CO CO O O N N co N - N N N N N N N N M M M M M M M (`'i C) M Ci M C') a ❑ N CO CD CO COO CDNINCOCO CO CO 0 CO O CO N O I- N CO N O O O CO V Cr CO O N CD CD N CO er O (D N _ CO N I- O V V N N - N IN 0 CO N O V O N N I- C O CO N Oai CD N N CO V N O I� CO N O CO CO M O CO x- 01 N CD N O N CD IN N N. CO O O O N CO CO V' 0 CD (O r-- co co m O (`07 ❑ N N N N N N N M M M co- M M co- co- M co.- M M co V V V V V 7 V CO CO O CO co u) _ CD CO N- V CO CO CD CO O CO N. O CD CO N 7 CO O N- CO CO CO O CO V O N CO CO N CO N. IN N O O N- L N N N N O CD Lc) (6 M ui ui N O O O6 O O O6 O O O O M CO M CO CO CO CO CO M CO CO CO M co co co co co co co co coNcoNM CO E N7 to d m WN a Cn N CO CO NO) N O CO N- CO CO N (O N CD CO NN N V 7 V J N x- 7 O V V CO V V V CO O O O O _O O CO CO Q CO CO M CO CO CD CO CO CO (O CO CO CO CD CD CD CD co CO (D CO CO CO CO CD co co co co CO CO CO CO CO CO CO CO CO CO M CO M CO M M CO CO CO CO CO (p U T U N m C E (b m m m o a -c- > co aa) co () o 2 m O o 0 Z IL a > > > co O U V o O N CO N N V CO O V V C M N V N N CD Cr Z N- OW V CO O O I. N CO .- 0 N- O CO N. I- O O N CO O O N CD Q N N I- O N O4 O M CD M CD (O M CO M (O O CO CO M6 M I- NN V OO Q 4 co co N N O O O CO O CO CO N CD CO CO CO V V M (O CD _ CO IL O O r N M V to O r 00 CO O O r N CO CO (O co O CO mr) ❑ -7 N N N K N C') co- co- M M M M co- M M M V 7 R V V V V V V V o .44.0 C .. .. 7 to Ca O C >. E o a1 d 'w 2 a •00'► U O v) O Cl) N •_ 0 coco co N- CO o CO I` o coU) (D CD CD 0) N. CO M O M _ V CO V CO N. .- V (D O c0 co co s. Lo N U) N. CD 7 OD (N CO (O CD O LO M t` N CO O 1'�� OD N (O r- V 0D M N- O V O M r 0) N C N D O)( M U) 'O (O N M 7 U)N. CO CO 0) (O O CO N I-- 1- N MV CO CO00 0) O (f) Cr) O O s- N N M M V U) U) CO CD N- N. c0 CO O) 0) O O ,- ,- N co M 0- `Ing <A N N N N N N N N N N N N N N N N N N N N M M M M M M M CO `g 7 O N N ] O a (LI N (0) Nal Y Y CO CCC CO N. CD 0) v. co co 0) co CO .- .- co U) N. CO V V O O CO I-- c- O U) (O CD a 4. (L d CO U) C V (N O .- N N- M CO r V O N N ,- (N M N U) N M .- N O - - U cil V) Z O O O O O O O O O O O O O O O O O O O O O ,- O O O O O o 0 0 Q N 0 a) C 0 0C C a)c O V G d CO CO Y Y � Y r m J - N r (O co N CO C O N. O (0 R Cr) 0 N N- CO U) V V (O O M CU 0 U) o '7( CU CO CO (O CO O co N O) CO N O C (O V V U) (Na) CO O V U) CO(O O Cr Q Q � U) CO co co CO co co r CO U) O co co O CO N. U) i0 co f- N U) sr D ) 0 ' CO O _� N N6 V V U) O 6 V CO U) 6) N (O O M (O CO O N U) cD co H H Y CO co N- M 0) U) r M CD CO (N CO U) N. V O N- M Cn N N CO V 0 O 0 U E co N N N ,- ,- O O 0 CD CT N CO CO N- n n CO CO CD U) U) V' V V co co M ,E N 0) CO co co co CO co CO CO CO CO CO co CO CO co- co CO CO CO cco CO co CO CO- co COo co N o o 3 C p C6 U) U) U) U) (n CU U) U) U) CC) (n N (n U) (n in (n U) (n U) (n U) U) CC) CU U) U) > > 4' w w O M N N CO r O CD M CO U) 7 I� U) CO U) O () N N- M M V (A CO n N O 0) CO V CO N- V CO 0) CO M (O M r U) N N. co c- CO CO O 0) (O 0) V r co CA N V CO (A M M N V O V- N- CO N M CO CO N- N CO CO N r 6 O , r N N N N V CO CO .- V CO CO 0) N Cn O O N 7 (O O O V p) CO N N `- CO 0) M N- (O C M CO N CO U) CP V CO N N. CO 0) M CO C C C 7 U) U) (O (O (O N- r N O co (n C O O ,- ,- ,- N N M M V V 7 U) U) `1 .c L cg •- N N N N N N• N N N• N• cC• N• N N w d t U) r n n N. N- N- r r n N- r N- r n N- r r N- N- r r N- r r N- h o, W O 0) O CA CA O) C C a) C O) CP O) 60) O CA C (A CA CA co co CA (A C) rZ co- co- U) U) U) U) co- co- co- U) U) L.6 U) U) (n CO (n (O N co- (O CO U) co- U) U) CO N O d C NV A 'D C U 0 0 O coU) I` O) 4 co N N N O CO V (O O) CO (N CO CO V O) Ln C y I- O (0 V VN.r c- CO N M V N- r V O O s- CD (N M V C V CO V- 9 CO C N- (D U) V N N O 6 CO M C 6 N- M 0) V O CO M O 6 CO N CO 3 d w c2 U N (O C M r U) CD CO r O V CO s. CO O N CO C M I-- O V CO (O C N >+ co M 7 V co U_ co (O_ CO N- N. N- CO CO CO CD O)_ O)_ O O .- ,- N N N M U o r e a , ' i i i N• N N N• N• N• N• N N O J O Z co' O W — 0 Q C c0 N CO CO (0 CLO NS) N- (0 (OO V O O 00)) n N O CO CO CO ON7 N CO((0 O O N U) (D CO O r- N M V CU CO N- 6 N (O O M N- CD 6 M M 0) M CO C CC co O CU C M N U) CA co r N (D U) 0) VCO N N. CO O R CO N n U) CO (D (0 h N- CO CO CID O) O) O O _ N N M M R V CO U) U) (0 CD CL N - c- c- s- N N N N N N N N• N N N• N• N• N• N N m Z 7 z cn (0 C Li CO CO CO V co U) N O N CO N- Q r r O) N O (O O co O CD U) V U) CO (D M V 0) C N- O CO N CO CO r M CO CA O V N O O CO (0 (O CO M ✓ 6 U) N- N CO V O (O .-- I- M 6 U) O (O M cO V O (D n M 0) 4 co CO N O CO CC) M O CO (O M s- CO (0 M CA CO V .- 0) N- V N CP N. V N co M V CO IO CO I` co co CA O ,- ,- N M sr V CO CD N- N- CO O) O O = N M 0) gl N Com' V V V V V V V' V V co- U) co- U) U) co co- CUCUCUco- U) U) CO (D CO (0 (D CO N CO O CO C CO O O U) CO r (D N O N CD N 'Q N. U) CO co O co co co U) N M O V CD CD U) N N- CO CO M N. O C) M O O) U) CO CO (D N N r M 0) U) O CO N r V 6 U) I` M CO V (D N CO M O) U) N- N U) N O 1- U) M O CO U) M O CO CO M CO (D 7 c- CA (0 V _ 0) r V N V U) (O CD r CO Cr) CP O N N M V U) U) CO N CO CO O O N M sr Q - V V V V V V V V U) co- co- U) U) U) U) co- co- co- CO U) U) CO CO CO CO O co 2 N U) •- (A (O V V CO CO CO V N. v- W O CA I-- N U) CD r- CO N M I` CO CP N OO U) N CO O U) CO O CO CO N. CO U) O n CO Cn M N- O V V CO N- CO CD (O O CO U) N- n N O) O O O O O O O) r N CO C 6 O) .0 .- (N N N N N N (N N '- c- co M M M M M M M CO M CO M co M CO M M M M co M M M M co co M E CO 0_ Qm N Y Q cn O N M U) V V CO CO M (0 O N- N 0) = CO U) CO O 0) V CO ? M CO CO Q CO CO CO CO CO CO CD O (.O CO N. CO CO CO I� CO CO N. CD r U) CO CD CO CO CD CD Q (O (O (O (0 (O (O (O (O CO (O (O (O CD CO (D (D (D (O CO CO CO (O (O CO CO CO CO co co co co co co co co co co co co CO M M co co co co co co co co co co co co C� UT V .i.-_ m C — E (U m m CO EL EL L -O c0 CO 00 0 `D , 000 Z [1 a_ > U) co V (0 (D O V N C U) (D M CD O N. U) (N M n CO (O cO N V Z aV N ,- CO V U) CO N- U) O O U) V N CO C O .- CO c- O CO 7 N M N CO U) O V CO M (` M CO CO U) O) U) O V O M r N (D co O) M N N ,- O C 0) CO CO N. N- CD (D U) CC V V co N N c-O O O O CO N M V U) U) CD N- CO CA 0 s- N M CC U) CO(O r CO 0) CD N M M sr CD (O Cn U) N U) U) U) U) U) U) N O O o (O O O O O O O r i. m O N m c M U i1 / as cc >, Er0 U a 6 3 a 0 cv IIIf�CO OD V O N- CO N- CD CO f- M m 0) 0) CD N V fN.- m O CO CO OD Y) )0 M 0) O a- COm N COm m V V COm COM N COM t` r- O U) N coM C) CO ,' m N m m V CO N V O M6 O M m m m m O m co a O m .- CO O V QM N- .- m O V CO CO N. N m O V CO N CO )0 O VV V )f 0 co co co r- N- co co O) O O O 0 .- .- N N N CO M V V VU \110 UH M M M h 6 M M M 6 M CM C) ) 4 V R V V 7 V VV V V V V CO - N N • ?> 0 41U N- (..1.. CO 03 CD Y Y N N V N M .- O V m N O V m CO m O O U) O N- CO )0 CO N O V M Q. d d CD N CD U) O N O O .- O .- N C) CO CO N ,- CO O N. CO V V O CO V N U) r U O ,- ,- N M O O O O O O O O O O O O O O O Ni O N M O O O 0 0 Z E 0 Q N O O y r` n 0 J CO 0) 0 8 _8 ©© w m m Y Y � co a- m n J J N O m O m m O M m m m r) O O M )0 O m O O M U O m N M O m 2 N M O N M V N.C.) M m V m O M r O 0 r C7 M M [ m O M < < 3 Q O m M LO .- CO m CO 0 V .- r co V Q) u) N O )0 V CO CO M N CO M D = 0 • M r` Ci N N Ci M V )f) m m N- N- m m m r m Ni N- .- O r` m m H H Y r- M O m CO O N- V .- CO 0 N O CO CO O r� V CO m M ,- CO NS NS n r O D U E 6 C N N .- .- .- .- O O O O O O m m m m N- N- N m m m m )0 )U) )0 V Q Q a E E x co- co- co co co co- co co- m N. r..-- N- r--- r` N r r n r` N N m co (t) .E .N CD co co m co co co co m m m m m m m m m m m m m m m m co m co m N 0 )0 )n N O )0 0 N )n N )0 )0 0 )0 V) l0 0 0 0 0 )A 0 )n )0 • It L.0 w X) N CO O CO O M )0 N O O U) V )0 CO V m m O m O O O O V V O O O N M m m N m )0 )0 O O V O C) OIOUDCOCO CONO) 17. N O m N- r N O m CO m O N CO N r- V CO CO V CO O )0 M V V Nihi M Ni O m i0 O )0 O )l) O )0 O 7 Co CO r- N 0 CO n N.: C) Oi U) C O) N m O V r-- V CO )0 m N )0 CO N )n O N m O CO m O M N- O V C O C CO m N- N- r- CO CO CO O CO O O O O .- .- .- N N N CO M V V V 0 )0 a.c E V N N N N N N N N N N N CO. M M M M CO- CO- M CO- C) (h C) M M M C) "O' N �, O O O N- N- O O O m O O m O O O m N- O O O m O O O N- m O rZ )17 l0 )0 )0 )f) t0 N )0 M N to )0 l0 )0 )0 10 )0 )0 , y .O U p L C t0) E 3 IN m N CO O CO M CO V m O m m N O V O N- h- V O U) N.y MV N C) a- .- C) m O O N. m m CO O a- .- N- m O )0 m CO CO O N M N co N M N O O m m )0 V M M M M N O )f) O )0 )0 r m O O ).d. ``y d U W m O CO N. 0 M O m V IN O CO m O N )0 CO CO CO m V r O CO U a) 6 a' T O M V V V 6 )0 )0 6 m m m N- N- N- 1-- m m m O O O O O O O a L 0 d C)) N N N N N N N N N N N N N N N N N N N N N N M M M M M 0 t 2 m H J > w7 z 2 Z to D r 0 N. N- N V V O m N. O N CO 0 N _ N.. O N CO N. CO m CO O V O V M Q U) CO O CO r )0 CD N. CO V CO )0 CO m V O m m O CO N M CO N (1) M V V M O V O V O 6 O )0 m O 6 O 6 O m N m N- M O m CC ,- )0 O M m O M N .- V m U) CO N )0 O N m O M m O CO IN O V IN r- N- CO CO CO 0) O O O O ,- N N (V CO CO CO V V 0 N 0 m m CL y N N N N N N N N M M M M M M M M M M M M M M M M M M M M Z Z ; co m c I. VV O )0 .- O )0 CO O )0 CO C) O O 0 O N V O .- CO )0 CO CO CO CO CO O 0 - U .- CO N a- V N. 0 N. )0 r- m .- O CO N V m O O U) CO N 0 r- O Ni m m V N. O N 0 m O M r- u) m Ni M N ON- u) CO a- O m m V N O N. )0 V N O O N- 0 V N O O N- 0 CO 4) M V ) co N- N- co O O a- N N CO V )0 m N. N. CO O O .- N N CO V )0 0) N x co m co- co co U) co- c0 r- r- r- r N- r N- N- f� r- r- r- co cU co co- co co- co a. O N = O )0 O m V O CO V O CO CD )0 U) V m O i0 N- m O m m )0 CO CO O M N- CO C) IN O )0 O M N- O CO N- V n V m N- O O 0 V M m O N- M O M N m O V m O N O r- O M m m )0 m M m O O M O N- 0 M .- O N- m V N O O N. 0 V N O CO h. )0 M N O m IN )0 CO V N m N- CO m O C) .- N CO CO V )0 CD N. CO CO O O N CO CO V )0 CD U = O )0 CO O M O O V 0 CO CO O O _ V O V CO O )0 m CO V 0 )0 CO CO CO O N m )0 )0 r O 0 N. m CO O m m m m O O O O O O O O O O O O O O Ni )0 V 6 N O O L - ,- .- N N N N N N N N N N .- N N N N N .- N COMM 0101010101 COCOCOCOCO M M M M M M M M M M M M M M E N ° 0._ U — CO .N Q CO N O N. CO V 0 V CO CO N. N. m M N CO )0 Cr) V .- CO N M CD O J m V O m CO N- CO m m CO m CO CO CO CO O O O O V N V N N- V U) 0 Jm 0 CO m m m m m m m m m m m O O m m6 m m6 O O6 O co co co M N N N N N N N N N N N N N N N N N N N CO CO CO M �p U T U N CO C E • N al CO CO CL CL L ) > m m m O 2 m O O O Z a a > > > V M N O N N O O N V M )0 )0 m m u) N- ChM = m N m U a V )0 N- N )0 m CO O CO N. N- CO V )0 O O m m m m N CO N V m .- V MN m if) O M O M N- N r )0 l0 O OD N- N. c0 m )0 V V CO CO N N .- O O O m OD N r COO CID )0)f )0 m 1 CD N. CO O O r N M V )0 m N- CO CO O C) N CO V �] m N- meci 0 r m co ao eo m m m ao 0) O O) 0) O O 0) 0) O of 0) o OD 1 N CO0 OC T O E• o „ d 0 a) 2 ✓ a in 3 30 Cl)' n . y CO M O U) U) U) N O N N V a) N V O V O U) CO O CO N O N W U) CO U) CO co .- co V O co O ,- co co O) N O CO U) U7 m O CO N v CO ,.�Z N V 4 r-: m U) M 4 m N. CO O 4 4 O V V V U) CO m O O6 co O O N CO U) IN O CO U) CO O CO CO CO N U) CO U) U) m CO m m m m I� IN IN n CO m N m O O O O O O O- [.- N. S 11/4,44 W; d E v v v e v a v v v v v v v v v a v v v n Ui L.6n vi m Illi co co O N N Z O IIN N U) Y Y C0) CCC CU N. V O O ) V 0 s COO M coM CO O CO U) O O m O V M O O m CO m m CO CO N- N. V U) O M CO M CO f� n CO r O n O U) W N C) O N N O V M CO (O m I- CO V P') V U) C) V U) U) U) 6 U) U) O r U) O 3 z .- .- C) LO 0 Q co O y Z CO0 0Q C- / CO m Cta Y Y O Y CC CC CO N J J l6 M V C) N V N. CO m CO N CO N C) U) 0 O V CO O O I1 x- N Q m V 0 N C) CON CO O N CO O N CO CO CO V O CU CO O IN m M CO Q Q � m N O O N CO U) M CO CO U] N O � CO N V m � N m COm N. N M D D 0 .- N U) CO ON: C) O V N N N .- CD m N N U) N- m N- N- r m co I- I- Y m U) V CO N O O N. co V co O I' V N O N- V co U) N O m C) O CJD UQ E L C_ V V V V V V co co M M CO M N N N N s- .- .- x- O O O O O O N- N- N- N- N- N- N- n N- N- N- N- I. r N- N- N- N- I` N-- N-- N r m co- CO ,E y (n co co m mmm m m m m m CO m m m m m m m m OD m m m m m U) U) U) U) U) U) U) U) U) U) U) U) U) U) 0 0 U) 0 0 U) U) U) U) 0 ., ▪ > > H 2 LE I" m U) N CO O N U) CO U) CO CO C) O V C) 0) O CO O m V IN V CO CO CO CO CO O I- CO V O N IN U) m O m CO m N U) N m U) m IN O m N IN CO CO 0 CO N U) m U) m N. a U) N- O V .V- N V CO CO U) O N m co m m Ni O U) M m N U) N- m I- m CO O C) ii C) I� CO CO O x- N V U) I- CO C) •- M U) N- CO C) M V U) CO N. CO O 0 CV-' C U) U) U) m m m CO CO CO (O N- N N- N I- CO CO CO CO CO CO CO CO CO 0) N L = M M w M M M M M M M M M M M M M M M M M M M M M M M M (U O O O O O O O O CO Off) O N. 0)O Cts- IN C) O O O O C) O O C)) O O COn O U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) N U) U) U) c Z NO is d '_ V R 'O C VN M V O N m U) m O N- m M O U) O N I- M O r m O O O C U O M m N. m .- m CO m M m CO O O U) N x- m CO m V CO U) U) C) CO w NCO N O M I` O V O U) O O O V co V O m V M M M M M C) Cg d w a) U CU m N. N. O O x- CO V U) IN O CO U) N- O N V N- C) CO m O N N CO d 0' A A x- x- N N N N N N N M M CO CO M V V V U) U) U) U) CO CO CO t m a --• 01 -01 _J - Z CO W = t O N CO N m m O N- O N N O CO CO CO m U) CO I� U) m O N- m N N-- CI V CO 0) CO V CO U) M U) N U) N. N IN O U) O U) C) U) m U) M CI) 0mV N O N. CC)V m M O V O U) M O h..: CO I` M V V M M I- m m m N- N- N. r N- IN CO CO CO CO CO CO O O O O co O O O O O CO- CL N 0 CM M M M M M M M M M M M M M M M M M M M M M M M V m Z i 2 z (0 c Li MU) IN V N M O O O CO x- O co N- m O O U) CO m V m V CO r (17 N- O m O N (0 V - CO CO CO N- CO V U) N m r- CO O N N U) O C) N (N N O N- M m O M M Ni O V m co m U) O N6 I- V N co V CO O M U) I� CO O O N N CO M M N NU) m CO CO (O m I- IN r r CO CO CO CO CO CO CA O CO O O O O O CO 0) O W ao co a(i (o ao ao 0o ao m ao m ao m m ao ao m ao ao ao m m ao 0. O N 2 CO C) N O I- CO U 0 U) N- O U) m (VO N O CO 0) N (m0 M V N 1- COO CO (MO CO x- 01 N CO CD m O N- V O U) V m O m N m m m M N. O O m 6 O N O O .- co co co V CO m ' CO U) CO CO O O .- N N CO CO N N C) CO I� N N- N CO CO CD CO CO CO O O O O O O O O O O O O O O O O CC CD m m m m m m m m m m m m m m O O O O O O O O O O O z 3 U) .- co U) U) N- x- U) N V N I� r- N- O O N N x- _ V CO CO U) O CO N m CO CO U) M CO U) U) N 0 U) N V M CO CO CO M CO U) O N. m U) 0 V U) V U) V N O m I- V Ni O I- M N m m m m O L .- `- 0 O O O O O O O co co co co O CO M M M M co M M co co co M CO M M CO M N N N N N N N N N E N ° coa- m •N 1 a J(n CO N V CO m CO O co O V N- CO U) O O CO N V m O _ M O U) N- CO O N V m CO N U) M CO O O CO CO V V CO CO m N N CO Q O O O C) U) CC (D O C) U) O V 6 N I` O U) CA M N.: O V O N N N co M co co M co co V V V U) U) U) m m I� N. n m m O O O O O O (D• m C E • U _ m m t ----O m m m O ` m O O O a z a- a > > > co m N- IN U) N O O r O V N. CO V C) U) C) CO O m O m N CO N CO COI- O N x- m V CO CO CO CO N O I- U) O C) V O U) CO CO CO CO m M CU U) O V V m m m6 N N U) N- m O6 M M4 U) m O O N V CO x- V_ m O N U) CO U) CO V N. O M m O CO m O N U) O N U) m ri,L7 N N N CO M M V V V U) U) U) m m m m IN N- N. CO CO m UO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m • o c > _ NE N Q r d d ON O a vU) N 01 1111 • N 0 CO0 CCO CO0V co0N- 0 CO 1�• 01 CO V 0 CO N CO 1- CD CO m W V ,- CD N- 0 CO N- N N M CO 00 CO N 1` CO 0) CO CO IICCD O)) 0) N V CC O M CO0CO O_ CI M CO CO N- V M CO O 0 co 0 N N- C so ZN CO CO V V V CO CO CO CO M CO 0 LC) N O) CO CO 0 N- CO 0 1` LO N O CO CO (D N- (O CO 0) 0 r N CO CO V CD C Lo- CO CO o N o CO CO O CO CO CO Cn O CO 1O O CO CO 1O O co-O co-O co-O O O O O `i�/2 N N 0. — 0 mii4gZ CLI r N CLO ibi CD CD Y Y Co CO CO CO CO CO M V (O = V OO CO 0 CO CO V M N- 0 0) N CO 0 V CO CO 0 N. 0_ D- a CO CO N- 1` N CO N 0 CO 0) N- CO N 0 CO CD V CD CO N CO U O O M N O N V CO CC) m CD ca N M6 N O O O r CO 4 C+) O fn O < CA H m 0 C) 7 ✓ n 0 J c �0 0) 0 O c V d L. m m Y Y D Y CC X m w so J J N co 0 0 CO CO N CO '- 0 CO co CO tO V CD CO CO CO CCCO N N N 0 N CD N- N- CO O CO 0 CO N CO M CO CD 0 O V CO CO 0 CO Q Q � a O V V' N COCD CO o CD CO CO o 0 LO Cn � CO O 0 = � � L V CO V 0 H H V Y• N 1..: 0 N 0 CO M O N- V = 0 ,4- CNN 0 V N N COOV CO CD CO N CO 0) 0 0 O 0 0 0 E o 0 CO N- n C- CO CO CO CO CO CO CO V V V co N = O 0) CO 1- CO CO CO V CO j Q < 0C Zg CO CO CO (O CO- CO CO CO- CO CO OO CO- (O q) CO CD CO CO ..0 Cn On CO Ln- .E N CO CO .N CC) CC CO Co L L L L L L CO L CD 10 L Co CO L Co CD CO L L L CO L m • o CO CO o CO CO o 10 CO CO LO CO 0 CO CO CO CO CO 0 CO CO CC 10 L L L D 2 CLIuW W CO 0 CO CO N N- 0 N- 0 CO V 0 CO N- CD N CO CO O 0 0 N 0 0) CO 0 1- 0) M N- 0 Cn C0 N CO0 Cn 0 .- )- V CO CO L CO N V NM O 0 CO N- N CO V V N CO CO CO 0 CO 0) 0 0 N- O N CO CO V CO M OV+) CC) O) O ,- 0 N O M V M O CO V O CO Oil 1- N CO 1- CO M 0 OO N- M O C.) iiCT N CD n C� CO CO 0 0) CO 0) CO CO CO r CO CO = CO CO V N 0) N- CO V CO CO C CO 0) 0 0) 0 0) 0) 0 0) 0 0) 0 0 0 0) 0) 0 CO CO CO CO N- V N- N- n 0 t L `= M M M M M M M M M M M M M M M M M M co- co- co- M co- ..:E) M M M w N 3 C) 0 0 m C) 0 C) 0N- 0 m O)N- 0N- C) 0N- 0N- C) 0 0 C) 0 0 o oN- N. 0 m N EO CO CO CO CO CO N CO CO CO CO O CO CO CA CO CO O CO CO CO CO CO Lo- ca CO L N Q' c z O U sC C 0 2 C 'O C U ` O CO CO 0 CO N- CO M V CO 0 CU N CO O C- CO N 1C 0 0 CO V 00 C CO 0 0 0 N N- 0 V V .- O N 0 N CO V O CO O O V 1` I.-- 0' ` 'O 22 w a, N CO N M N O N N .- LO O CO 0) O 0 N V CO co O N V CO O N V I- O w d U N V M co 0 N CO CO V N- 0 CO h. 0) 0) CO N- CO CO CO V CO CO N 4 0 V N y X T N N 0 0 CO 0 0 0 0 0 0 .-- ,- '- .- N COV Cn CD n CO 0) 0 s- N CO L C) Cab % M M M M C? M M V V 7 V N CO CO Cn > N J F 2Z U) O W J 0 0 00 0) CO M 0 CO CO 0 N CO CO r 0) CO 0 0 V CO CO CO N N Q 0 CO CO CO '- CO CO 0 0) CO N 0 N- C) 0 CO CD CO CO N COVN V 4) 0 O O 0 O V CO V M O 1- V O M N 0 CO CO O V N O N O) r.: CC M N CO CO 01 0 0 0 0 O 0 0) 0 0) N CO N 0 0 CO V N O 0 O ,- ,- ,- ,- 0 0 CO[ CO lO 0 0 s- .- 0 0 O 0 0 0 0 O) 0) 0) CO CO 03 0 CL w fn N V V V V V V V V V V V V V V V V V V M M M M M M M M CO Z Z 2 c co is c Q 0) V CO CC CO '- N CO CO CD M CO V CO CO CO N- CO 0CO S CD N N CO CO M CO CO CO CO V O CO CO CO CO 0 V O CO M 0 CLO 000 01 0 N N V M 1- Ni n V Ni O O CO 0) V 0 M CO N N- 0 n M CD 03 0 N- CO iO CO V CO CONN CNINCNCVN N M M V V CO CO CO CO CO V N CO CO CO CO co 0 CO CO co 0 CO L CD c co 0 0 CO CO CO 0 co co CO 00 CO coce co V) VDD 0 (71 CO N N DD L ID CO CD CO lO CO OD [O 0 pp m a0 co- CO Co N Q.— V 0 0 (01--- CO .- '- 0 CO 0 CO O N O M 0 N- CO CO M N- V CO CO V CD4 CO CO CO 0 V 0 CO N C) CCC N- CO 0 COCO O O N CO 0 CO O CO Ni 0 CO CO 0 M 1- Ni C- CO O CO 1` CO 0 N- CD CO V V M CO N N s- N N CO CO V V CO CO CO CO O 0 0 0) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 >� CD N 0 L N N CO CCl CD L N CO CD Cb CC CO CC) 0 L CO CO CO CO L CO CCi 3 O V CO N CO '- V 0 CD N- CO CO CON N O CD s- M = 0 CD CO CO CO CO 0 0 V OO N N- CO N- 0 M V N- _ CO 0 CO M CO 0 V CJ d) CO V N- V 0 r CO Cn V N Oi Cn CO r N- C 6 Cn N- CJ M N L 0 CO CO CO CO N- r N- CO CO CD CO CD CO CO CO CO CO O co 7 N N N N N N N N N N N N N N N N N N N N N N N N N N E __ N — a_ m Ti a Q CO N n 0 CO CO CO N CO M CO CO N 0 CO N 0 0 CO 0 N s-0 W W J V CO CO 0 0 N- CO 0 0 CO 0 0 CDCO CO NCO Q N N N6 M N O CO C- 6 V O CO 1` N- n )` N- N- N- N- C O N M C") 1p 0 0 0 0 0 00 0 0 0 0 0 CO CO CO CO CO CO CO CO 00 CO 0 0 0 0) CO CO C E • C) l0 m m co O m 0 co 0 z a C1 > > > 0 0 0 N 0 V0 CO CO N- r CD CO 0 M M CO CO L CO CO N- N 0 N- CO a O O CO CO CD M V COM CD CO N CO M O 0 N O N O CO 0 V V (/�) (O .- V Cn V (O 0 N N C•) N CO f0 0 N co .- CO CO O viii CO 0 co Lo '- � .- 0 CV CN CO CO CO V- N co N- 0 0 0 0 Ni N- _ N- O4O CNO 0 O_ O 0 N N CO0 CO CO CO V CO co ^ co 0 0 O CC N COM V CO CO p ,- N N N ,- N ►�I/ C .. .. = a t- r��'%Z W o C T �' p Q .0+ m N y m N I.4� 0 d U) U) N M • . y IA O) N. V (0(O O LO N CD N s- CO CD CO V (O M U) O) In m O 0) N COW nco t n Vco co CDco cococo Vco co co N CO O v (O fO MIM 00 N- N U) N N- O M O4 O M M O N- O M C7 N N N '0 no 1 (n N- C) N N N- O N In N. O N (n CO O CO (O CO s- V M CD IN 0 CI) N (n (n U) (O (O (O (O N- N- IN N.- CO CO CO CO CD CD O CD O O 0 1- s- a- N N 3 \\W� d co- co- co- co (O co- co- co- co- co- (D co- (o co- co- co- co- co- 1� R.- N: r R. N: N: N- N: CO log (n w �� N N O ? p r v_ O N N h m Y Y 0) CC V N- V '- CO N CO CO N V N a- V V N V N O CO N O C) N- a- n CO CD 0 0 a N- I,- N M N- co OO '- V N CO CO CO V s- N- N 0 V CO O CO CO N- V CO N N U N O N- V O N N- M O V N N- O r N M co O .- N CO N- N- M N- M O O n z a a 0 O) CD N.: N. y 07 0 0 0 J co• m Y 7 Y X X N w J J (D N CD N N M V M O) O) 0 NO C (D M W O In V Nl CO 0) N co V O Z M CD N-0 N CD ' N N (O O ON-D COW CO N C) N (O CD V M N CD N N- CO CO Q Q 3 Q (n CD O (O CO � N- N CO CO N V � N N- CD N s- O O (D N CO V .- V NI- D J 0 ' N O N (D (O 6 V C7 V N 00 N- O V M M O N n N V V N N co H I- Y co 1n N O N N CD (O M O I- V O N- V c- 00 N N OO N N CD (O MON O 0 0 E (n co N N N c- .- ,- O O O O (D CD (D CO N CO N. N- IN M (O (O 0 (n (O 0 V E N In 000 co co co co coco co co co m m m (C co co co co co co cco m m oo co Vm co In V) N N (n (n (n 0 N LO (n N (n In co n N 4lO (n (n 0 In 0 In In (n H 2 W w > > CO N CO V N O N C) V CD (O V V C) N- O CO CO CD N. N- (O CO (n CO 0 V O) N. N (D (n O N M IN M CO CD (f) (D CO V CO CD N- N N- N O CO N N CO N N V CD (n IN V) () N. M M CO V O N Cr (O N CO = CO CD = N d 0 O (O co M I- M CD O V N O O N M V M CD V CD (n M O U - O) N N OCD CO - N- N- O N- N- CO CO O C O c N- r n NC) CD CON N- r N- r N. r N-N- I- O (O M (O O O (O (O O (O O O (O O O (O M O (O N- N- .. LC C) C) C) M M U) C) M (h (") M M M C C) CO C) CO M CO CO M CO M (h C) U) w = rn N. rn N- rn rn rn N- rn rn rn rn N- rn rn N- IN rn N- N- N- N- N. N- IN N. N. iZ (n (n (n (n (n (n (n (n (n N (n (n (n u) (n (n (n (n (n (n (n (n (n mc u o c d U N V c O V - OVWn OD N. n N O) N V n (O CO O (n CN- N V O s- 00NC () VNV CD OCDV VN NOOOODOD OCD (OV CO 0 O O w m 0 N V N O N cri CO W N COCO N (n CO .- O NCO O M (n In CO N (D D N N V N- C) V N. O M CO O) N 0 0 N W V co N = T o co M V V V V (n (n cc CO M O IN IN CO CO W O Cr) co 0) C) O O L d L (n N (n N (n N (n In u7 (n (n u7 In (n (n (n co- (n (n co- N co- co- co- (D (.13- CO 0 o 0 C o `co J I- 2 Z co O W 7 t 0 V O N� V Cr (D CO (O N OD M CO CO O 0 CD V CO N- V N- Q N- V co V N N CO CD C) N- M CO IN (O (n U) N- M M N W V V O N U) N V n coCD ( i•-• V O N CO V M M V O N- 6 r (n6 (n N O N- V V M M M N N a- O O O 00000 O a- N 01 .4- .4- CO CO CO CO CO N CO CO CO CO CO CO CO CO CO CO CO CO 00 CO CO CO CO CO CO CO CO CL N N = Ca 2 2 m en (0 C u_ — V M - O O M N. Cr CO O N. V V (O CO CO O CD (n (n CO CO O CD (n (O O N N• V Cr V ( COC)e- n ,- O Q) N- N M N (D N- M O CON CO V N (O (n (O CD N (n N- N CD O N M V (n (O (O N- N CD O N N M V V V V (n (n N (n N CO O O CO O O O M (O CO M CO N- N- N- N- N- r- W co co co co co co m co co c0 co co OD co co co co co co co co co co CO O CO OD CO 00 O OD CO OD CO OD CO- OD CO- CO CO- N O CO W CO- CO OD CO 00OD CO- CO- a O N M j NCONO 0, c0 M V ( N CD (O V COM s- O CO n 0 V N CO- N 03 CO V N O M (n M N- Cb N (T O N M V V (n CO N- N CD O) O N V V V V N (n (n Ln M (n (n (n CD W O W W O CO W O CD (O O N- N- r O co CD 0 CD W (D CD CD m rn CD C rn rn CD W CD 0) W CD (D CD CD CD 0) 0) >0 au co ao co 0o ao ao ao co ao m eo aD m a0 aD m ro aD co m m m F 2 V N N- CO N- CO (n N- V s- V CO OD V CD M '- N M N- N. N- C) CO N 0) N- (n N- (D (n N- CO N CO M N N- N- CO CO C) N CO (n CO O V (n N N N N N M V (O O N- N O N M N M (n N- CD 6 V V L CO (O CO (O (O (.O CO O CO CO CO O M CO CO N- IN N- N. N- IN N- IN CO CO CO CO NNNN NNNNN NNNNN NNNNN NNNNN NNN E N ° 0 ;° Qm N Q co co (n V V N (n CD N CO N V M (n N (n (n CO OD (n (n (n (n N CO J CO .- O OO (n CO (n V (n (n CO V N (n V V V V V V V V V VV V V Q (O M V V V N. OD CO N CO (D 00 Co N 00 N (O N CO N co O co OD CO co CD co co co co OD co co co O 0O co coco co N OD co co co co co co co co OD co S T V O) m C E L▪ -0 > co co co O 7 ,0000 Z o o' > > > W N N OO .- N- .- .- V O (O O (D 0 V - (O M M N O (O V N- O (n N z a. N. N. O CD IN V CO N CD CO V O O V (D CO V (O N- CO O CO O V V CD CO Q N I- N- CD (O OD O CD O V in (n r O) O N V (n N- CD CD N M M co N (n N N (n (D V N- V N- O CO (O CD N O CD N Ln CO Ln CO (n CO CD CO N- N- NN NOO ON CNO ND NO CND OM OM OCh OM s- .M- N) N MN M M M V o N 60 h a _N, mR N o. ar2 ' E •o _ com Z4 - mm C.) 0. in33o m co y • O m O O O V' m N- M O) O • O N m viM r O m m O O m CO 7 M 0) m 0) N m M r m ,. CO CO CO CO N O m O m V m O O CO - 'p co CO V' CO O CO CO 0) 0 O 0 O co (0 m 0) N CO CO d- • CN CO M CO R V' V V CO LO 0 (0 m (0 (0 r N. N- CO CO rn ' o N N • n r•-• O Q N N CO m Y Y V) (a (6 .- M O M V' .- 0) 0) CO O CO V' CO N CC) 0) O N O a a s d O CO a- N O O N O CO V' CO (0 N CO 0) f` a- CO CO O V c' V' N f- O O N , m f- m M M O O V' O O O O J Z • U QN 0) 0) 1 d J C 0)) 00)) O 1o _- @© a z,.:_ m m Y Y D Y CC a' (0 (p CO N- CO CO N V 0) co CO CO CO CO V' CO M N J J ZV' O CO CO N V' CO O) 0) N CO N CO N0) V' a- O CO Q Q o Q CO CO CO CO CO N O O N O CO CO CO V' 0) CO O 0) V' D D U ' O 0) r- m N- m O V' V V' O) O m m N. m M 4 f.: O ' co l- I- Y V' O co V co CO N 0) CO N C) CO CO O r d• a- N- V' O D U E CO n ix Ca' 7 •V' CO CO CO N N N a- a- c- a- C) C) O 0) 0) 0) CO CO » H COco dccm M mQmQd cE COCO COmm co COmmm co CO co co Cco- m • oo _ Ld _ O O co O CO CO CO CO CO CO CO CO co O CO O O CO CO CO CO F- 2w - co O N CO CO 0) 0) O N. CO CO 0) CO CO CO CO 0) CO CO M N- r N- O O C) CO O CO V CO N CO CO CO CO CO .. 0) CO CO CO 0) 0) 0) CO CO O 0) N M O r N N- CO CO f-- d ,- O N O O 0) M O O O N N (O CO 0) 0) O U ii 0) N CO V' V' CONCON. N N CO CO CO N- r N- CO CO CO 0) 0) O C O C r-- r-- f- N- N.- N.- N. N- N- N- r-- N.. CO d L L = co- M M M co- M M M M cocoM co- M co- M M M coM •rd• N t �, W o) 0) 01 0) Q) a) a) 0) 0) 0) TN- 0) 0) m a) m 0) 0) 0) O Z O O O O O O O O O O O O O O O O O O O O C dO 0 N r C d U CO 'O U U U d C 0 N- O M CO N a- CO CO 'O CO(O 0) O O a- C) O N- 0) (N N- CO N V V- N- CO CO CO N CO 0) CO N CO f- CO CO 0) O d 'a-) M M CO VCO CO CO CO M CO CO CO O N m VCO 6 w ct dN CO (N dl• N- O CO CO 0) N CO 0) N CO CO V' CO N V' r J d 15 C‘ > d .-- N (N N M CO CO CO V' V dl• CO CO CO CO CO CO N- r-- r Ld a x (O 0 O c0 O (D (O (D co- O co- c0 (O (DO (OO c0 (O Oc3 > z 0 > o 0 5 J F 2 Z m O w2 O O CO N O CO 0) N- N CO CO O CO CO CO CO Q m (0 V' f- CO (N CO 0) CO CO CO CO V CO CO CO CO CO CO 0) CO O) M r CO 0) N N CO 0) M CO CO CC CO co f- N- CO CO 0) 0) O O O .- N N N CO CO V V m CO CO CO CO COCOCO0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) Q. a) cn = M M M M M M M M M M M M M M M M M M M M CO Z 2 m z U) co c LL co V' _ 0) M O CO CO CO CO CO o N- V' CO 0) N M V' M 0) CO CO V' N V 0) V V' N d• N- o CO 0) O CO O (O r N- m 0) O M O r m O N V' m N- f� N- N- r r co co co co co co co co CO 0) 0) 0) 0) O d fn co co co co co co co co co co co co co co co co co co co O) 0) ro ao ao ao eo ao m m m ao ro ao m co m m ao ao (occ 0 (fin _ - O) CO d• CO CO M o CO CO O O (V 0) O V' N. CO CO V' N o 0) N- CO V N M 0) Cr V' V' CO O CO CO 0) (V CO V' O O m N- m m 0) 0) O m N- 0) O (N (00)O) N. N- N- N- N- f- N- N- N. N- ' CO CO CO CO CO CO 0) 0) 0) 0) 0) Cr) 0) 0) 0) 0) W W O) m 0) 0) 0) CD 0) rn CI rn ° 0) • m ao m m m m m m m m m m m m m m m m m '. CO CO 0) CO N- O CO O N 0) N- I CO 0) CO N. CO m (0 0) V' CO V' N CO C) CO _ N CO CO CO O V' CO V' V' CO CO V N 0) f- r CO r r r N- N. I. N- N- (O (O N N- L co co co co f- N- f- f- N- N. N- n N- N- r N N- N- N- N- ."7 N N N N N N N N N N N N N N N N N N N N E .E _ 1 (5 eaa co N • • Q (/) N 0) V. CO CO CO O 0) O N V' 0) CO CO Q V CO CO V' R CO V' r CO n CO CO CO CO CO V' N o N N Q CO Co CO CO CO CO CO CO Or... CO (O r f` f` r CO CO V' V' (p co co co co co co co co 0) co co co CO CO CO CO CO CO CO CO U >` U f0 C cCD CO U • E• 0 10 m CO CL CL U > CO CO m Q O `m O O O r Z a a > > > co co o CO f- 0) N- N 0) N- (N M M d• .- O CO M O 0 o CO CO CO a- N- a- M CO CO (N CO CO CO N CO CO a-- O C N.: Co N N N CO f- N I` N O CO O (O 0) O) CO O) O 0 (h (h V' N- C) V' N- O CO CO 0) CO CO 0) N CO CO d• N V' a V' 7 CO O (O m CO CO m r r r CO m m 0) 0) m o o m •� ad cb . ci 2 7 a f. a .. c > a m d o 0 c.) a. cn c3 cn E o of N CV 2 (7 • • 11ZTOm 1�egI �We CO Ell M 21- II ! O Nil ©© a m m Y Y Y Q Q N N J J - < < CO O 0 0 U U E — co N O O 3 c > > w I L ❑ 2 L hi N c c m d L CO w L r LO N U N c N N r .- N (� Ci d y !p O Z 'C gC2cu O E ✓ d caA 2 1a O y a m CI a U wcew mUen d d a O ❑❑ O7R NOON CO J ❑ z N ❑ m <O 1N c m r` v m j � ul E = •-. m t0 -c U � COL CC Ct Cl. a ca m I Z o cn II >- as o c LLo m C 2 d 1 E t 92 E °' m o, O 2 ❑_ U 0 N md E rn ea 0 Z r` N W !C c I O a Z O a 0 Q U U w i W0 co U _I cci [) r D + 2 rn r` v CO c0 O 1O 10 d M N V co N U) N Q V p,'- N- r- cof. N CD N 0 .NO.. N CO- CO- fV V L m Cn- .__i UO p N. T E N N a a)• c0L '� co .- co ( o �.. CO C0 O. 111 'O O L d o N O O N L W O � N _ t U > cO c0 00 N ❑ 7 c, F O O E CO O O O E N d co z d d > > > c d ❑ = a g a c :° O c c n do 0 c " ao =o f iiio N tll p 0 r d d y 1a , N U d in ❑ U ❑ Z:\-1 M • • Urn oil 1 iY IMS0 `um m4Z 0 m Q 0 Q t 0 Q 0- ^+ 1 W ca GC .v L. a) Eo Qascoo 00 N. ♦^ m � C v/ N t t a Lo cl m E L ID 0 -a > 00 0o a N __ a° 0 O �M Z a` a » S o L1. N • • CO m icliz v a Z w 0 coMI Mg co'tO 00 bli�2 O 6 W O N N O rn o ch O N N ) Y (I) O Q. II U Q U rn CO CD• s p o f D U d 00 00 YY 3 Y b3 - Q Q Q CC 'y D D 0 .. co U U E ami d d > ',. Q Q a_ co W y d d m d '2 c 0) v )9 J O O ` CN c C ' Y a, > d 0 E 0 ✓ ii c v I o d L CaO C7 1 L m a) d m To c a:' LLd ~c I d• U ' VU � 7 Vd co.° y C d U N V O)o O w d, w A OE > > C • • cN0 QL N a a, 00 N r- Gt OC RCl) O) O V o O omNN / o J QZ fn O 0 o0 0 0 D o c`' m o 0 co 0) a) (o CO ° o 0 o) co CD a rn 0 d a) °)_ Et I � ' a Ci LL aa)) 1 o r m I I a 7 d ci) 0 To co c 0 a o ii ° F W �, o N > r N O) 'O W d tc rn a c 2 c o) R o 2 p d O Z W N L' y m C oI _ Z W v N d y O 0 J Z = O Q D I- U Co Q a, r rr o CDN m N .... N 0.1 W 0 p U V d C,1 d > = V d °' N 0 w m o I E . C ,n N I I u) Qr O N ',..2 N I0 MI a_ m d W :, N 3 3 3 . COo (5 CD V 7 <5O o o > d Q Q ' O O O co I 0 O (i) co r6 co co V p d N J d0 W = = d R Q cN 0 U m co co Z m co U >. d Q U 0 a > > •o > • m z « m O d m .° y E d m N N ? _Q Q Q +L-O co co co zz O ` m O o 0 z d a > > > C , C Sc Q r rco C O ID d c d 0lo I m E y : ° o m a m o 0 C .. .. N O c N c •y c E U ° C h O. N . a a) y to O N d 0p d r a C O) ? ° V O C •o « d d d ° W d A « « O O m d •O N CO d d d O Va` m33o a mc9m in maa 3 3 a 3 0 a > > N N. n O W • V 10 N. O CO CO r fN (D m 1111O O O M N (O (O CD O m V (O O N. W M l0 CO 0 O O 0 - CD M 0 M W M M V CO M Cb CO 6) 13 LIII N N N CO V CO CD CO CO N- co �W0 U) CO 0 m ,bg_ �^ > = 0 a N N 6 M Y Y CC) W 0) O O 0 CO N CO h N C- CO 0) CO M CO V O) v- O CCa. Q Ll 0 a 1 O CD V IN 0 O 6) N V CD r- V O) CD LO r- O) co y N U O 0 O O N O 0 O O 0 0 O V M C 7 O > z S.' 0 LO CC) ¢ m N 0 CO d 7 0) W 0 0 C O o U(3 Ua 1 = CO co a Y Y 7 Y CL Ct O' N _ J J N 0 N N C- 0) Cr N CO CO 0 CO N CO 0 W CD Q 0) V CO .- CrV LO V N N 0) CO N M N 0 N CO Q Q 3 0) 0 O N 0) .- N- N h- � r CO v co l0 CO CD V ,- I- I- 0 Y CO CO a) O) O) CD 6) M r CD M LO r V N- N6 COco CO CO CO CD CO CD N CO V V CO N N N 0 O 0 0 E CD O (D CD CO CO CO 0 C CD CD CD CO CD CD CO CO CD O CO > Q Q CD co a, !' r y 66066 0 0 0 6 0 66606 60 0 a) a) a) a, CO a) a) a) a) a, 6) 6) 6) a) a) a) a) c.)Q CC Lc, CO CD CCO CD CO Cr) CC) CO CD CD CD Cn CD CD 10 10 in .) .0 E 2 o o _ > H S w 1 w O CD Ns V .- CO M .- 0 CO CO N V V O N N 0 .- CO CO N. CD CO CO CO 0) N- r� N N. O CD CD N. N- co r V M N V 0) N 0 CD V 0) r- N- N Nrs N- r CD 0 M a0 N6 CD O N. 'Cr CD CO N6 O p) CO M CO M V V V CO CO CD CD CO N- N- CO CO 0) 0 C p c CO a) O) O W CO CO CO a) CO O) 0 CO 6) O) 0) 6) 0 2 .c CO Y6 N N l0 L = O) a) O) O) O) 6) O) W a) 6) O) W O) 6) O) W 6) O w N NCA w N N C 7 CO CD CD CO CO CD CD CO CO CD CD CD CD CD CD CO CD N- fU ` O O ` I, O 0) a) a) 6) O) a) O) O) a) O) 6) O) a) O) O) co O) W_ CD CO CD CD CO CO CD CD Cn CO CD CO ) CD CD CO CD CO o ., c O 0600 Z m •- O O_ O_ O_ O_ C pc C° ' t0i o oOC O 0U = L N O N >O >O >O O O a) Cn CO ,- r• 0 0 C .- N _ N N. CO O 0 0 O 0 CO 0) N .- CO 0 0 CD M N IN 0) 6) 0) 0) 0 O• dNN rCD N a 0 O 0 0 O M 6) CO - N La M O M O O ) O N (N Co V V V CO UCON w N ( N1p c UC CO CO CO CO To CL L p 0> 0 O 7 CO O) O m 7 > > J F 2 z y o c 2 .� 2 2 2 2 Crw + Cr + + + + C v 2 U cctY 2' Q' 4 a) w m L. w w t. 0 a 3 + 3 + + + + 0 .- r` co ro In CO V o CO n CD CD CO V CD C2 •5 ❑❑> 00000 0 0 N O N- N- CD O) V' n CO N- V (V CO CO N- M ON) T > T> > > 0 0 O , N i0 0 V CD 0 N W r� V W CO (O C:) (' N N N M V V V CO co m Z z ; (/)_ < 0 0 0 0 C c L.L O M (O CO CD N N M CD N OD 0 N CO 6 co 6 05 � N N CDCO 0) 7 N- 0 O V O) CD V N IN M N. M + ++ + + O M r- M 6) V N CO O) a) M N- O) O CD M N 0 2' O re a' Q' + CO CO CO CO V 'Cr Lo M a) N N CO CO O) 7 CO U) O E >j w »j � u_ u_ w N M. V CO CO (n CO N. CO CD CO 0) 0) 0co z p + O + + + + O w a 7) ❑ ❑ ❑ ❑ O 12 o 2 o 2 2 2 2 CO N CO CO IN N- CO V r M CD CO CD r N CO Ca CO O f- r-- t` 0) CO V (O Q) CO V CO (D M (D N O 0- d. CO CO O m CD N. Cn N- N 6) M N. r- N r V 6) CO ,- co co O Q a. V co CO CD CD VV 0 M 0) N N .- U) 0) M CO CO 0 0 > CO > o N- N M v In CO CO (D N- CO 6) 0) 0) 00 NCD m D N c- M ❑ ----- -, N 0c1002o Y > O a- x- CO N- N. r N. N M V N N-DI CO M CV CO 0 Ur 2 C7 (0 �> N CO N 0 0) N CO N- CD CD CD CD N CO O Y p Y .0 O co O N N 0 0 0 O 0 O .N- CO N N N N 6 O F- O I- O F- E CO CO — M M CO M M M M CO co CO M CO M CO O O Z i. = T 2 2 = H r� m N o m m CO CO CO (TQ ) m Q N N d a_ (1 D.d d O 2('� CO N CO N CD CO CO N o 0 0 0 0 0 0 0 0 CD CO C) D) CD CO N CD O 0 'Cr CO N IN O) 'Cr 0 .¢J CO > > > > > > > 0 ND r V C 0) N- 6) 0 CCD N CO r CO LO V N Q y co co CD CD N CO N 0 O 0 0 .- M C) i0 O co (O CD CO (O r- 0 0 M CO CO CD CO CD M CO 1p co O) N N CD V O O CJ >. o V O V ' CD CO N O CO O x CO CO CD ,- CO N V E CO U I- NO •- N N 0 0 N C < O d -co > co co co O 2 CD 9 0 0 Z Ll. (L > > N CD V r O CD N CD N CO CD N CO 0 CO N. a- a- 0 CO CD CO C CD N x- V 07 M N. N. N- CD O) CO fD O) CO V N. N 0 O CD CO (i.fj�a coOBD o N V (O COO N. Co(O ^ f� C) O_ V CD O) M CO O (O (h O n /ny W Q) co 0) OO M V CO CD N CO V C01 CO CO CD I� CONO) W co O 0) ,- CD �( C.) E N N o o 2 Q : y CCi l�4. a LL c .. lir.... cr. cy,u O C aC p E Q « N d N j N .4). 0 tL CT) zi 0 Cl) U) NI CO W O 0) O NM Ca CO 0 CO M CO 0) W •O CON- V n V CD N 0) O M m . r' 3- 0 3- 0) O) 0) N O 3- O N- 0 CO CO co I.�� CD V V M M N M CD O N- (D M V 0) O (D r:. CD t0 CO O l0 O 0) 6D) P O O N M C0 OD C0 CD O N V a0 6 0) M N- 3- 30N- COO ,- N01 U 3- N N N M M M M V V V C0 l0 CD CD CD CD IN N N n j �'U d m V7 N `V N N O 5 O S1 N N Mil Y 0 CD CO CD 30 O 0) M CD 30 M CD 0) V V N M CO r N N CD 0) 30 Cn N CO 0 CL aa V C0 C0 V CD D) CD 0) 10 M N- n 0 C0 M 0) V 0) Cn co 3- CD V N.- CD NQ. - L U C0 CD N .- N 3- O O N O O O O O N6 O O = O N C0 CO 0 V Ch 4 o D D Q N U 0) 0) 3y O7 rn 0) Ua 0 a co m 2 Y Y 3 Y CC a W N J J l[I N N. V O 0) CD O C0 M CO 0) M CO C0 N- V V CD Cb CO CO N- CD C0 N 3- Z Q M M N CO CO CD C0 N O N 1` 0) N CO M M M V C0 O N C0 N Q < CO V O CO .- CO CD O M N- V 0) V co CO coO) CO V CD •- N O 0 OD CD M 0 co H 1- Y CA CA co N n C0 CO 1` CD CD C0 V N O N- V = m CD CD COM O 0) n CO CO V O D U E Co (O C0 C0 C0 CO C0 V V a V COM M V V N N N N 3- 3- 3- .- 3- 3- C CO C0 W (D O E y N 0) a> 00) co D) 00) 0) 00) 00) D) coOco 00) 00) 00) 0) 0) 00) 00) 0) co m 0) 0) 00) 0) 00) 7 6 C0 6 CO CO 6 6) C0 C0 C0 C0 C0 C0 0 i0 C0 C0 CO C0 C0 C0 C0 6 6 6 6 6 > > H 2 w w N- n V CA CO CO 0) N 0 O O N- M 0) M N- 0 O CO CO CD V 0) N M N CO CD M CD N- OD N- O CD O O V N- CO 30 0) 0 CO M CO M M CD N. V V O CO CO .- 0) O N V V M N. O 0) CD N V 30 N O M 30 V CO co CV CD 6 N O OD 6 O CD CO 6 N V O O CO r r N- N M 0 CD V 0) C) OO CCM OOO V N D) N 0M .- 30CD N CD O O NC C O O O O O NN N N CO CO M V V V V V C0 CA NO L L O O O O O O O O O O O O O O O O O O O O O O O O O O O w Ut to co0) 0) D) a) 0) D) O) 0) 0) 0) 0) C) 0) 0) D) O) 0) 0) O) 0) O) 0) O) 0) 0) 0) l Z Cn 30- 0- 0- Cn 0- 0- Cn 0- 0 Cn 30- 0 0 0- 0- Cn 0- 30- Cn 36 311- 0- Cn 0- C0 CO a) O hi C N U l0 'O C V y O N M O - - 0) co CD O) N 3- 0) V C0 O) N N- V M V M N M N O i y IC) 0 CD 0) O CD 1- M DC N 30 C0 CO N O M CO N- V CD N 0 V V N M V CD O C0 CO V r OJ 0) M W M M co M O) N- CO C0 N O) CD CO CO CO 0) M (Si O w y a) U N CD I� CO 03 0) O N V 1� 0) .- N M CO OD V N- O N 30 CD N- CO D) O U cD y cc T R N N N N N M M 01 V V V V V V V C0 C0 J F rL 2 Cn O w 7 O CO - N- N M O CO 3- M O N 0 N V N r 3- O O CO 0) CD M ,- C- CD CO Q, Cn N- N 1` O co CO N CD 0) M V C0 N 0) 30 N N O O C0 CO CO N N co CD M N CO V N O 0) N- O CD CD 6 6 V V V CD 0) M CD N N O l N- N- CO W O 3- V N- O N V C0 I- O M CD W N C0 CO .- M V C0 I,- r 0) .- N N N N N M M M M V V V C0 C0 C0 C0 C0 C0 C0 a N x M Z 'z 7 0D 03 0 �..L r N CO V N CO CO 0 O N V 0) 0 N- O CD CD C0 CO M CD 30 O W M 30 N N 3- (O 0) M O N 3- CD N M CO N- co D) ,- 6 V V M CD CO O N M N M CO N- V M OD OD V O V 0) V O 6 D) N V CJ M Q a0 V 1- O CD V M N 3- CD O V M N O CO N- CD V N 30 N13 to O N N M V C0 (O (p O 1*--. 00 0 O O N M V V V t0 C C0 1, O) N N• N N• N N N N N N N N a • — N N- 0) N- M M O 0 M 0) V O CO CO N 0 O M CO M O 30 V CD CO V N O CD 0) M 0) N O CD N N N- n N O _ 0 M V N 0) 30 CD O O 0) CO 6 W CD CO N N N N- N OD M N- 6 N O m ca N- c- V N- O C0 V M N O CD O) VD CD O O 3- V N C0 M V n N N N CO M V C0 CD N- N- N O 0) O - N M V C0 C0 C0 CD CO CD CD U i 3- 3- " 3- 3- 3- •' 3- 3- c- 3- 3- 3- 3- N N N• N N• N N N 01- N- 04- 01- 0,1 O NC- 0100010101 M N N N N M V O O 0 3- C0 O N C0 CD 0) CD CD M O N N N 0) O M C0 30 CD 0) M V V N 0) 0)0 N f0 V. d) 0) O O N N .- N 0) O) 0) O) O O CO 6 V 6 0) O O O -- N N M L .- N N N N N N .- N N 3- .- N N N N N N N N M M M M M M M M M M M M M M M M M Ch M M M M 010101010 E N — a- mN Q CO O 0) CO N- CO CO 0) (O N. O C0 V CO V V N- C0 O C0 O) V V CO N- V CD J N M 3- 30 M 30 Oa) O N- 3- 3- V 0) V N CD CD r N O N- V OD V M Q 0 n O CD 0) O V M V V V M CO CO C0 (0 6 6 N D)i M V V M .- .- .- 3- N N NNNNN N N N N N NNNNN M M M M M T U -� N CO C E0 • O -°d LD > co CD N O ` co 0 0 0 z a a > > > N O) N CO N 0) 0) V CD CO CO (0 0) N- CD (0 CD 0) N s- M CO ,- CO CD z a ._ CD OD V CD CO N- r 0) CO ,- O V N- O) N CO V O) CO ,- O CO 0) N O CO C0 OD O V O O V D V O V O M N- O O 0 O M CO Pis 0) W CO CO a CD CO N O n N N N Ca M V C0 CO(D r COa0 m D) O N M V 30 O CO N. N- (O CO CO NN• NN• NN NU 6 2e�Z �CO .. � .. � � E - 6 ==73 Za 4.1t g f_ • _� . _7 ON r CO CO V CO O (0 O O N O) CO CO CO I` N N Cr Cr CO N CO W r f n O O r N O O O V O O [) (O O O N O O V V O ..-- co ,. O M CO CO t0 O O M f� O (O M (O O V (D O N V n to V N) N) co V O CO O co r N N CO CO CO CO V CA V O CO O (O O N- N- f` N- N CO co O O_ O A-A- NNCOCO CO CO sr 4- 6 N co N- N- co. CO m m `W� N ^ NN 7 — 0 N- U AO attZ N N N N (I) Ni Y Y 0) CO CD N CO V N- CO O O N O CO N CO CA N CO V V V (O O A- CO a. d O_ a U) UC) CO (O CO O .- O to .- CO .- CO V ,- N O CO A- N A VV U A- A- A- A N '- . O O O O .- r O O O O O O O O O O O O O CU co Z V' C) Q N O a y 7 J E,m mm� ``Q O ©© d 0 m Y Y DY C --I -1 LON- N O N CO CO CO CO (O CO CO CO O CO 0) r CO CO CO CO CO A- V Z CO N- CO N CO N- CO O O) CO U V V O CO CO C CO CO CO CO 0) O < < 3 a C CO(O ll') COON- V (O f� � N O (O O M M O O M D = 0 iA O O CO N O 6 O O O N O O V O N co O N (O O CI 6 CO H H Y V N N A- N- COODLONCO V O (O N O CO A- CO V O I- M O (O N O O () E co > > > Crn A- A- O O CD 0) O CO co m N. N- D CD (o N (O (O vV VCO M QQ 2 yWmCO0) CD0) 0000mC0C0p co- ommCO _ m 'E N (0 CC0 co- (0 aCOC0U) 7C0 O O Cn O CO O 0 CO CO O 0 0 O CO CO CO O N 0 N O CO CO COCCwr- 2 w — NCO CO O CO OD CO r N- r A- Cn N CO CO CO O O V N N- N Cr M • O) V co O CO CO O O (O CO CO N- O N 00 O N- N- V (O N CD CO _ V CO OM M (O N M M N N r N- O M CO CO NIVON V CU r O O O O N M M M M N V N- 0) N 6 N- 6 O N CO N- C) N N 0 ii O) NO CO (O CO O M N- LO O M N- N (O O V O) M I- CO O V 0 c ...... ..0 CO CO CO CO CO (O N N CD CO COMMO 0 N N OIV V N L e O p O O O O O O O O O O O O w d L' C co0) N- r r r N- r N r I- N- N- N N- N- N N- r r N- N- n N- n Z O 0) O M O O) (A O)O O O O D) O CCC) O O O O 0) O O re CO Cn CO CO CO CO CO CO CO CO ac i() CO CO CO CO (O (O (O CO CO CO CO CO C J O y ._ C N 0 'O C U d C (V C O CO .- COCO O O r N N (O O N N Cn O N M O M O CO N- O O C.) 00 I- co O CO (O N O N N M r M r N- CO O V N I- O O 9 )- ` w W 6 V V O CO O O CO W CO (O V O CO O CO N V O CO m V O w a) U N .- M co N CO N CO O M N- CO O M CO O M N- O V CO '- CO CD N 0LI 7 N Ce T CO CO CO N Cn (O (O (O N N O O C0 O O O O O _ _ _ N N N M L d ?? O CO O M CO O O O r A- O CD N- CO N CO N- M CO CD O O Q N M V N V N O O VN N- N U V m (O M CO V O O co V O (I) CO O O m O N V V V CO V N O M (O O N V CO O N V I- O M CC Oa) M CO N CO O V CD N (O A- CO O COOD N CO O CO O M CON CO (O (O CO O Is- N- OD CO CO O O O O O N N M M M V V N Q. N N m Z 2 is C O CO Cn V N- N CO M CO O 1O M O (O N- CO N N- N- IO V O V CO CFO A- N t\ Is- CO CO CO O N N N A- M N CO O CO V N- 0) ✓ O O I. N V �' CO N O M V M O CO N U) V O CO V O (O N 00 OON N (Oct NON- ON O O (O M ,- O CO V N O N CO N O N Cl) LOCO 00 ON- CO O O O ,- N N M V CO CO CO N CD CO O O A- N N A C.ON N N N N N N N N M M M M M M M M M M M M M V V V V CI N CO CO CO COO O N N CO (0 M N O CO O CO _ N O N- N CO N O O O M Cr Cr CC) O N CO O N CO Cr 0 CO N- CO N N- O V V N- N - N.- N- CO CO N O V O r N - N- V O O N CO V N 6 V O CO CO N N CO V N O N CO N O CD CO M O CO V O N V N O I` co N- I` r CO O O O N M M V LOW CON- CO O O O N M M CC CV- 0V N N N N M M M M M M M M M M M M M V V V V V O ✓ CO CO CDO CO CO _ CO CO r V M CO (O OD O O N- 00 CO n V O O I- M (O CO O CO V O N N O N M N N N O O N C) .- O O CO CO CO M CO Cn N- O O O O O O O O O O O O L NN N NA- N N N N A- A- A- N N N 7 M M M COM COCOVICOM M M M M M COCOCICOM M M M M M E ,_ N co IZ co 'N 1 NCO CO N- O N O CO N U) lO Is- N N OD CO N N NV Cr V J Ns- 7 O V V CO V V V M O O O A- O O A- A- A- O _ M CD JM M CO COO CO O (O O CO CO (O O (O (O (O co CO (O CO (O CO CO (O CO co co co co co co co co co co co co co co co co co co M co co co co M co 8 V N co E C) m 0 -‹ 0a. Z CO CO OCO O▪ ` m 0 0 0 Q Z Q. 0_ > > > (O O ,- () CFO O N (O N N Cr U ) O V V CO M N V N N CO V Z an O W V M O O N N CO A- O ,- O M 1--- N- O O N M O O N- 00 N f� N- O N O V O M CO M CO CO M N M (O O CO O M O M r N N cop V O _ O < V M ['INCA- O O O O O CD CD r (O (O CO CO V Cr CO 0000 LLO O N M V CO O r CO N O O r N M V CO O N- N O (n AL) Q N N N,g iii ? N CO- CO- CO- CO- CO- CO- CO- CO- CO- CO- COCr- Cr- V V V V V V V V h C 8 111 .. 6 z = a,N a rn a, o £ o' m d .y °o2 ZrN,`v camOo 33 (I) N M 4111 All_ . M CI N- N 0 CO 7 N- CD CC) (0 (O CO 0) N- CO CO 0 CO V CO V (C ' m IN V (O O CO (b CO (O V N Cf) N- (O V co N CO CO CO O In CO N- N CO N VCO N CO V CO M C- V O r- V N O M r O) N 1n O) N (O O) M Ip 0] II (O s- N- N CO CO CO V m (n 0 N 7 (D 7 N- N N. N CO M CO V O) V O (O ,� m O O r r N N M CO V u7 (O (D (p IN f- co co m m O O r N CO CO CO lb CO N N N N N N N N N N N N N N N N N N N M M CO- CI M CO- M CO 7 N N O O N NI h MA Y Y (I) CO CO r (O O) V co co O) M co co (O N- (D V Cr O 0 CO N. 7 0 (O (D CD d d. (D (O (O V N O 7 N r-- M (D r V O N N 7 N CO N (O N M 7 N O a O O O O6 O O0 O O O O6 O O6 O 0 0 O O r O O O O O 7 3 z (F Q y 0Lo CD wJ o aa) m 0 s- m m a Y Y 3 Y cC cc to y • J J (6 N N- O r--O CO N V V CO r O V O N O ( O) ( IN CD m V V (O O CO N- V (O N Z Q IN (C) CO O r N CO CO N O V V O) O N. ( (O N CD CO O V (O (O 0 I- < Q (D COcon CD (O (O CO LC) M (D 0 0 CO M N IN 7 (O (O IN 7 7 CO r • : : 0 ' (D 0 N N M V V (O (O O) CO (D M m N (O O M CD N O N C) (D co H H Y co (O 1- M (3) (O 7 IN M m (O N CO N 7 N V O N M (3) (O N CO Cr 0 O D U E (O C N N N 7 .- O O O m O) CO CO N t` n N-- co CO (O LO (O 'Cr V V CO CO M > < Q 7 x m T m CP a) of Di co- 6 CD co- co- N co- co- co- CD O co- co- co- CD co-aD co- CO 6 6fD co CO E n y W CD O N m CD CD O (D aD N (n CD CD CD CO (D CD CO N CD (D CO CD CO CO CD N O H` i CO 7 m (O (f) N (O (O (O N (O (O (O (O (O (O CO (O (O (O (O (O (O (O (O (O (O (O (O > > W w co M V N CO N- 0 (O M OD (O V N- N CO (O 0 CD CO N. M CO V m CO N- N 0 m CO V CD r V co m N M (O CO 7 N- (O N 7 N- co r- (D to O m CD m V N- M CA N V CD CO CO M N V m V N- (O N M CO (D N- 7 7 N (O M CO N- m O �_ N N N N4 (O m .- V (C) _ (O m N (O (O O N V (D CO O U ii a) co N N- (O CD CO C- (O CD M CO N (O (O m V (D N N- .- (O m M CO C O C V (O_ (O (O_ (O CO N. N- co CO co C) O)_ O O ,- )- N N CO M V V V (O (O - L = .- N N N N N N N N N• N• N• N N N CO N C co N- N- N- N- r n N- N- N` N- N- N N` IN N- C` N- N- N- N- N- N- N- N- N- N- h m m m m m m m m D) a) m a1 m m m m m m m m m Orn m m a) D) 0) K z ui (n N (ri U (n ui (n (( (ri (n co- ui (n (n LS (n (n U (n (n (n (n (n (n (n U) a) o u - C N U CO U U C 7 O co V ,r) N- CO V N N N N 0 CO V (O m (O N CO CO V m LO N. O O V V O IN (N CO N M V N- N. `Cr 0 CD C (O N M V CO V O V fO O ` CCOUN 64NO m O M m O 0) (\ M m V O O M 0 O O N co a) co co m CO N- 0 V CO c (O N CO m M N- O V CO (O m CV dQT CC Mco V V CO (O (OCO CO N. N- N-- OD CD CO CO m m O O 7 7 7 N N N CO Com) Q L' CO 2 IK ' i ' ' ( ( i N N N N• N• N• N N N > W 3 J F Z N O O V N� V 0 V (O N N- (O CO 7 N m 7 N N V (O CO CO CO N (O CO m M NI- Q. m CO N- N CO (O M 7 N- (O 7 V 0 0 m N. m 0 (O M N- M N CO 7 0 N Q) (O co O N M V (O (O N m N (O 0 M N CO m M (O m M (O m CC co O (O m CO N- 7 (O m M N- N (O _ (C) m V N N N (O 0 V O N N (O O (D CD n N- CO CO (O m m O O N N CO M V V CO (O (O (D CD Q. N to '•-• 7— 7— 7 7 7 7 7 7— 7 7 N N N N N N N N N N N• N• N• N N N COcg Z ; m is c LL co iO M V CO (O (O 0 ,- N CD 7 N� V N� .- IN m N 0 (O 0 CO m (D (O Cr (O (O CD CO Cr m V N- 0 CO N CO CO N- M CO m 0 V N 0 O CO (O (O (D M CO ✓ m (O n N (D V O CO r M6 (O O (O M6 V O (O N- CO m V (O N 0 OD (O CO 0 CO (O M 7 O (O CO 7 m CO V '7 m N� V N 0) IN V N 0) ^ M `Cr (O N CO r--- CD m m O s- .-- N M a V (O (O r N-- CO CO O O .- N M o to Vv v V v v v v v v (n (C (n (n (n (n (- 6 CC) (n (n (n 6 co- co m m (C Q. 0 y M O co m co O 0 (O CO IN 7 CO N m N CO N V N. (O 7 (O N Cr '- 0 0) (O CO (O N M m V (D m CO N N- CO (D CO N. m 0 CO 7 O m (O (0 (O CO N N N- M m (O 0 (O N r V m (O N- C) m V (O N m M a) (O N- N (O N 0 N (O CO 0 CO (O CO 0 CO (O M 7 CO (O V 7 m (O V ‘.- m N- V N V (O m (O N. CO m m O N N CO V m (O CO N. CO CO m O N CO Cr Q V 2 N (O 7 m 0 V V co co m V N- 7 CO 0 CO N. N c- (O m 7 CO N M C- co m N (O (O N CO C) (O CO m (D (O - N CO (O 0 N- (D m COa Cr IN 0 O N- (D CO (O (O (DLO N- N- CO m O 0 s. O 0 O O m n m W m m m t ,- N N N N N N N N j M co co M co co co co M M M M M M M co CO CO CO M M CO M M CO el co E m _ a El N 4 U) 0 N M (O V V co co co (O O N- 7 N m 7 (D (O OD O m V CO Cl. M CO CO Q N CO (D (O (O (O (O (O CO (O N- (O ODCO N CO (D N- (O N- (O (O (O (O (O (O CO Q (O CO (O (O (D CD CO (O (O (O (O CO (O (O co (O CO (D (D (O (O (O (O CO (O (O CO �Q co co co co co co co co M CO M CO CO CO CO CO CO M M CO M M M M co co co Y �` U N m C Q• o a r > CO CO m O E co 0 0 0 Z Nl a_ > > > (O — M Cr (D (O O V N m N (D CO CO O N- (O N CO N- CO (O CO N Cr Cl. z a N 7 CO V (O CO N- (O 0 O (O V N (O m 0 7 7 (D 7 N- 0 CO V N MQ. N (O (O O V CD M N- CO CD 7 to (O m (O O V m M C- N (O (O m cop CO N N 7 7 0 m m CO N N. N. (O CO (f) V Cr V M N N 7 7 0 0 m OD N M V COmCri O N- (O (O CO N- O .- N CO V (O CO N- CO m O N M M V (4'1 C .. • 7 (O CO (O co- co- (O (O (O (O u) CO (O co- co- (O co- co- co- O (O (O N- NS N- N- N- N- 0 ii 0 p C T E 2 ad+ C) d y 7 0f "r� U d too CI) • N CO • f_ - CO ill -1 CO CO n C O n M n CO M N- O CO 0) 0) CO N C n CO O .-- CO 111 CO U) U7 t- Cl 0) C O t- CO N CO CO C C CO M N CO N- n O CO CO t- M M CO ,.gig I O N CO CO C n O N C n O M O O CD CO co can CD O CO O13 O CO (N CO O C O M n CO O C O CO N- N CD O C co N CD CO O C C C CO CO CO CO CO N- IN CO CO 0) 0) 0) O O N N N M M C C C) O J `W.w d $ M M M co M M M M M M M coco M C C C C C C C C C C C C C m N N �� to to 0 O a N N O CO COm Y Y CO (0 CCC C N CO t- O C CO N O C CO M CO 0 O U) t- O .- n CO CO O N O C M CC Cl COa N CD CO O N O O t- O t- N O CO M N t- CO O n CO C C O M C N U O a- t- N CO O O O O O O O O O O O O O O O N O N M O O O > Z = O LO LO Q y O O ,ST 3 n n 0 J O O O O 0 O O aU i m m a Y Y n T. y ccO CO CO CO CO CO M CO CO N- O O M CO O CD O O CO CO O CO N M O CD J J Q N M O N CO C n M CO CO C CO O CO n O CO n CO CO CO CC) CO O M Q Q D O CO CO CO CO CO O CO C n CO C O CO CC) O CO C O CO M N CO M • D 0 ' M n MN N M M C CO CO CO n n CD CO CO n CO N n �_ O n O co H H Y n CO O CO C') O N- C t- CO CO N O CO M O n C .- CO CO M CO C s- CO O (3 0 E CO C N N t- .- t- .- O O O O O O CO CO CO CO n n n co co co O CO CO CO C > Q Q 3 ro ro CO ao ao ao ao ao CO n n n n n n n n n n n n n n O O E •jp y CO CO CO CO CO CO CO CO co CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO N O O ` C 0CO C) CO 3 CO CO CO CO CO CO CCO CO CO CO CO CO CO CO CO CO CC) CO CO CO CO .C) CO C) O I- � w w CO N O CO CO CO CO CO N CC) O CO C CO M C CO CO O CO O O O O Cr 'Cr O O O N CO CO CO N CO C) CO 0) O C O O CO O CO CO CO CO N O 0 N O O N- N- N O CD CO CO C) N CO N IN C CO M C O O CO CO Cr N N CO N O (C) CO O CO O CC) O CC) O d' CO M n N CO M n n M O C) U V C) N CO O C N- � C CO CO CO N CO CO N CO O N CO O CO CO O M N- O Cr C G C CO CO N- N- N- CO CO CO O O O O O O x- .- r- N N N M M C Cr CLO CO 112 t Lr N N N N N N N N N N N M CO- M M M M M M M M M Cl- M M M M w . t. C0 n N- n n n n n n n n n n n n n n n n N- n n n n n n n n O, O O O CCC) O O O CCC) O O O CCC) O O O O O O O O CCC) O O ZZ CO N CO N CO CO CO CO CO N CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO N O C d O R O d C3 n CO N CO O CO CO CO C CO O CO .- CO N CO CCD n n C O CO n C O O CC) C N 0 O CO O O N- CO O CD 0 n CO 0) CC) CD CO CO O N N6 co N M N O O6 CO CO C M M m C7 N O CO O CO CO n CO O O lU N U H CO O co n O co co CO CO C n O co co co N CO CO M CO CO C n O co <2N Q' co C C C CO CO CO CO O O O n n n n O O O O O O O O O O t- W L N N N N N N N N N N N N N N N N N N N N N N N M M C? co- ( 0 0> 0 J 0 Z M D 3 CCU CO O � t O N- n N C C O CO n O N M CO N ..... n O N CO n O CO CO O C O C CO CZ CO CO O CO n CO CO n M C CO CO CO O C O CO CO O CO N CO CO N co M C C M O C O C O CO O 6 CO O CO O CO O CO N CO n M O O CC) co co co O co n C co _ CO co_ N CO O N CO O M CO O M n O C N- n N- CO CO CO CO O O O O N N N CO CO co C C O CO CO co co CL N g N N N N N N N N M M M M M M M M M M M M M M M M M M M M Z 2 m c_ LI CTOCO 00 COV0N. ON1- OC CO CI COO O N t- CO N — 1. O CO CO O CO CO C CO 0) CO O CO M N CO n O N O CO C n O N O O O M n CO CO N CC N. N O n CO M N- O CO CO C N O n CO C N O O N- CO C N O O n CO M M C CO CO N- n CO O O N N N M C O CO n n CO CO O r N N M C CO 0) CO • CC (O CC CD CO CO CO CO n n n n- n n n r� r` O (D O CO CO CO Q. 0 0) O CO O CO C O CO C O CO CO CO CO C CO O CO n CO O CO CO CO CO CO O CO Ns CO CO N- O CO O CO n O M N- C N- C CO IN O O LO C M CO O n M O M CO CO O C CO O N CO n O M CO O CO CO M O O O M O n CO CO O IN CO C N O O N- CO C N O CO N- CO M N O CO N- CO M C CO CO n CO CO O O N M CO C CO CD n CO CO O O N CO CO C CO CO • 2 O CO M O CO O O C CO CO CO O CO _ CC) C CO CO O N CO N CO N- O C0 C CO O CO CO CO C CO CO CO CO M 0 N CO CO CO n O CO N- CO CD 0 CO CO CO CO O O O O O O O O O O CA (A O O) Ni CO C CO CO O O .0 .- .- -- = N N N N N N N N N N N N N N N N ▪ COMM COMM MCI COCICICICI CO COCICICO M M M M M COVICICI E _ N L. 1 = CO 74 Q Cl) N O N- CO C CO C M CO N- N- CO M N CO CO CO C t- CO N CO CO 0 Q CO C O CO CO n CO CO CO CO CO CO CO CO CO O O O O C N- C N N- C CO CO J CO CO M co co CO CO CO CO CO CO co CO CO O O co CO CO CO CO CO O O O O Qco co co CO N N N N N N N N N N N N N N N N N N N CO CO CO M 8T0 C O — N CO E Q O d C is > co co co O 7 , 000 Z 0- a > > > C M IN CO N .- CO O O n C M CO CO CO CO CC) N- O CO O IN CO 0 Z Com C CO n N CO CO O O M n n M C C) O 0 O O CO O N O N C O .- 7 co M n O CO O M O M n N n _ CO CO O C O C O N r.: O O O CO N- n CO CO CO C C CO CO N N 3- O O O CO CO n IN CO CO CO CO C Cr O CO IN CO CO O t- N CO C U) co n co co O O N CO C CO CO n co O O 6O in • n n n r� CO CO O O CO CO CO CO Di CC m O Di m Di Di m m m o U) 1I ,i45,11 .. N. 0E g a m C o 2 NE d_ d y 14 0 O N 0 co ___ M CO III _. N N CO N V A- O V O U) CO O CO N O N.O COM O COU) U) U) N .- Ill V LO O CO O CO O V O CO O r CO CO 0) N O CO LO N CD O N N v 00 MIN V V ro CO N. M V (O CD M O4 CD O V V V U) CO N O O O OD so I O Lo 6 O N M U) COCD CD 0 CD O M U) N. O M (O O N U) OD V r` O M f� co ca 00 WINO N N O MaZ Ns Ns N N LO O W - CO CO• N V OO CO CO V CD O CO CO N. CO O CD U) O O CD O V M •- O O CD a a. d d CO CD (D A- CO CO N. h V CD r. O CO -- COCOCO AN. r. N. co N. O N. O CD 4 Q O Ni N6 CO (D OD r- CO V M V (D M4 U) U) U) Ni (D U) O - xi Q CO O) Z Nc- r r c- r r r U OLC) O d N.: r 0 J O �O\oa)` Q D O V V a CD Q] N Y Y Y CC l0 N J JM V O N V CD CO CO CO N CD N O CD r 0) CO V CD O O Ns A- N Q CD V O N A- CO O O N (D CD N M CO N V O r` CO O r CO rD M CO < Q 3 CO N O 0) N CO CD M CO CO IA N O M N V O N 0 co r- N M D D 0 ' A- N U) M O r M Oi V O Ni Ni 6 CO N Ni xi r- N N. r. r-. (D co F- F- Y CD U) V CO N O O N. 0 V CO O Ns V N O N. V .- Co U) N O co 1) 0 0 0 E U) 4 V V V V V (h M M M M M N N N N A- A- A- A- O O O O O O > Q QE CO cor; N. N. N. r` N. N- r` r` r- r— N. r- r� r` r; r� N NS Ns ( ro ( W tD d .� a CO O co co co co co co co co O co co CD co CO co co co co co co co co co co N O O 3 C CC m U) 40 U) U) CO U) n N CO U) U) U) (D CO U) (D U) U) 6N Lo U) CD Cl) CO 6F- 2 W LU co U) N CD O (N LD CO U) CO CD O O V O O O CO O CD V N. V CO CO 0) O CD O N. M V O N N. U) CO O - CO CO CO N CD V N O CO N 4- CN CO CO CD Ns O CD N N- CO CO O M N CO CO U) CO N. CO U) N. O V A- 6 V M M CO O N O (O CD O Ni O U) M OD N U) r- OD N. CD (O O U 'O 0) N- CD O O N V CD N. CO O M U) N- CO O CO V LO CD N. CO O 0 C OC U) CO U) CO CD (D CD CD CD CO N. N- N. N. N. N. CD OD CO CO CID OD CO OD CO 0) d L L C" M M M M M M M M M M M M M M M M M M M M M M M M M M w N 7 O O O O O0) 0) O O 0) N. O O 0)) Off) O O O 0)) Off) 0) O 0)) 0)) 0 0 ✓ Z U) U) U) N U) U) U) U) CO U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) d O d '- 0 0 0 d N EC 3 M CO O N COLO COO ,- (D M O C0 O N f� M O N. CDO O O C U O M CO N. CD .- CO CD CD (N M CO CO O 0) U) N CD CO 0 V CO U) U) O CO d w N M N O M r. O V O U) .- O O6 V CO OM M M M M M O w d U N (O N. N. O O CO V U) Ns O CO U) N. O N V N. O M CO O N U) CO U ad, d C a W A- A- A- A- N N N N N N N M CO CO M CO V V V U) U) U) U) CD CD CO L d D (`' (h C? C) M (h M CJ t' M C) C7 M C? Me?.- C`7 M C) C? CI (h Ch C? C7 u >o o r t !9 J F 2 Z U) O W t O N CO N CD CO O N. O (N N. O CO M M CO U) O h U) CO 0) N. N N N- 0_ V 0) O CO VCO U) CO U) N U) N. N N. O U) O U) O N CD U) CO U) U) V N U) N O V OD M O V O U) M O N M N. M V V M M N- CC CO CO O O .- CO V4) N. CO O N M U) N. CO O N M U) CD N. CD O O 0 CO CD CO N N- N. N- N- N- N. (IO N N CD CID CD O O O O O O O O O 0 a O N C_'' M M M M M M M M M M M M M M M M M M M M M M M M V V m Z Z 2 m co c M U) N. V N CO O O O CO O CO N. CD O O U) CO CO V CO V CO .- CO N. O CD O N CD V A- CO 0) CO r CO V U) N CO A- CD O N N C0 O O 0) N r` M Ui O M M Ni O V m CO 6 xi Oi N Ni N. V N co O N M CD O .- V CD O s- COM U) N. CON O O N N COM M M N N 4) CD CD CO (O CO r N. N. N. CD CO CO CO CO CO O CO 0) O O 0) 0) O O O 0) to cn co y j" m N N CD W a0 N CO O OD O O DD a0 O O O W fD fO O a0 CD a0 a0 OD 0 2. CD O N O N. CO CD V U) CO CO V CD CO N V U) O CD CO 0) CO CO 0) CO O U) r O U) CO CO M O N O N CD M V U) CD O CO O N V 0) CO O r V O xi V U) O CD N (O O CO M N O O CD CO O N O O co (O CO r- V CD CO A- CO CD CD CO O O - N N CO CO N N0 CO Ns Ns n N. CD CO CO CO O O O O O O O 00000 O O 0 0 0 G E co m ao ao ao aD ao ao o m m aD m O O O m O O O rn O Di O 7 U) = CO U) U) N. A- U) N V N r N. O O N N .- _ V A- M CO U) O CO N CD M O U) M CO U) U) N O U) (N V CO CO O CO M CO U) O N CD U) 6 V 6 V 6 V N . O N N V N O r- M Ni O CO CD O O L O O O O O co O O co co co co O co co co co co co co co co M co co co co co co co N N N (N N N N N N E _ d co N Q co co N V CO N CO O M O V N. CD .- C0 O O CD N V CD O _ M O J U) N. CO O N V CO CD N U) CO OD O 0) N CO V V CD N CO N N CO Q O 6 O M U) ((i C(i O M U) 6 V W N N. O CO O Ci N- N NiN 6 C O ((pp co co co co co co co Cr V V U) U) U) CO O N. N. r CO CD 0) O O O O 0 >. U .--. r r r d co C `" E d C6 < 0 d C U > CO CO CO O ` co 0 0 0 Z D a > > > (O CO N. N. U) N O O N. 0) V r CO V O U) O CO 0) CO O CD N CO N CO Z CO6 O N A- CD V O CO CD CO N O N. U) O O V O U) CO M CO CO CO CA) Ui O V V CO CD CO O N Ni U) N. CO O CO M M4 CD O O6 Ni V CO O co A- V CO O N U) CO U) CO V N. O CO CO O CO CD O N U) O N U) CO N N N CO CO M V V V U) U) U) CD CD CD CO N. N. N. N N O CO O O a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . -� c .. • U o c O ) >,d c)E -o dd7. a) 7) 0 o 11, . 0. 0 0 co CV M y _ • N O CO 11) C V Cr, IN C) m N. CO M V C) m N U) m CO CO 111m N V m m M .- M V e- O I- O M Ie- N N M m m m N N- N- m m ,. iii r O O r m m O m O N. M m m N- V M N O m U) a m m N CO Mco m CO U) N m m M O M O O N- `�� V COm CO m m N- CO m O gig O N M M M y m u) m u) m m m m m m m m m m CO > N • 7 O N N O QM h N O N a) CO W CO CO ` CO CO CO m m M M V co .- V m U) O M m V M I� LOO N m O V CO O O Q. a s d .- m co N- IN N CO N O m .- O N- M N CO .- M m V CO M 0 N U O O M N O N V m 6 C OD m N M O N O O O M O o (' (U Z r r Q N C C ry o7 C C) O o 0 d — m C• O Y Y Y = a' a' N N J J m O to M CO N .- 0) m m m el V 0 (N M M CO u) m m Q N O N m I) N- O O O M N M U) M CO O N Cn V CO m Cn Q Q � m V V N m M o m (o C m o m m ,� ,n M m o � m � m CO m m D 0 . V I- m N- O I` N. m V M N O O N. m 6 N O N.: 6 N N V co F F Y N- CO ND N CO CO CO O I� V CO V N N CO Cr In m m IN CO CO O O O O O E )n C co N- N- n m m m m In u) C V V V M N .- O C m N- m U a) In > Q Q E a y co- omo m u co m m mm comco m mm CO. CO. CO- ro comomo ro m m m o a000 co co co N 2 N 7 In In In In In IA L U) In In In U U) 1n to In In In u) In In N L N In > > Ow w Cn O In M N N- O N- O N V O M N. O N M CO In O O N C CO V N- CO CO N- m Cn CO CO CO O N CN. V U) co co co N- V N O Co CO co N- (N co V V N CO CO CO 01 CO C O O N- O N CO CO V V co hi V O O .- C N O M V C) O m V O m m I- N m r C M O m m m O) N CO N. r m O CO C C C m m m I- U) CO m m V N O I- n U) C 0 C CO m CO C C C C CO CO Co C O C O 0) m m m CO m CO N. n N- N L L = co- C) C) M M C) (h C) C) Ch C) C) co. C) C) C) C) C) co- M co- co- co- co- co" w m N- C C rn rn N.- N. N- C C C rn N- (-- M rn N.- r-- r-- N- C O M rn r-- a) c Z vi vi vi (n m U) u) N vi m u) m U) dO 0 C U N C N 'O C U N C m a, m (n IN ..0M V CO O IN N O I) m O IN O n G N ` CO CO CO O N I� CO V V O N f� C)O N m V CO r-- m O O N NM N O Ni N .- Cn m .6 (Ad O Ni V Cn m O Ni V m O O m O w d U N V M m O N Cn m V I- O CO N- O O CO N- m CO Cn V CO CO M V a) 8 d' A N I- CO CO CO O C co O O O .- .- .- .- N M V V) m N. m CO O O •- c10) IX = 0) 0 CO- C) ei r) C) C) r) v v v v g v v v v v v v v q v vi 6 .. w 7 J 1- z Z co t 0 O co C CO CO CO CO CO C N CO CO N. 0) CO CO O V In (n CO N N N N !Z 0 m Cn m M m O 0) CO N O IN C C CO CO CO C N N NI- (1) (1) CO O O O In V (n V M O N- V O M N C m m (n V N O O CC CON- COMM 00000 O O C C N- ONO MUD V NO O CO O O O O O O O O O O O O C O C m O Cr) m CO- CL M M Z Z z m C Li C V co co N N M m m M M V M m In N (n m V C m O O O N- N m m M m N m m V O Cn m m m O V O m M C O m CO C N N V N- M N Ni r4 Ni O O (n C4 O M m Ni I- m C C C IN m Cn if) V CO CO N (11 N N N N N N CO M V V U) In In X) L a) COCOODCOCO COCOCOODCO COCOCOCOOD m m m m m m m m CO CO 01 N m m m m m m m m m m m m m m m m m m m m m m m m COa CC O N ✓ m CO CO M N- V N CO V COV In U) CO a) V O () N C)) .0 N- N- O O O N (n m N O 6 N m m m C M I. N I. m O In n r N- C N. m In V V M M N N .- .-- N N CO CO V V In In (n (n N m O O C C CC COCOC C COCOC C C C COO C C C C O O _ _ 0 m m m m m m m m m m m m m m m m m m m m m m m m m g O V co N O .- V O m r m N M N .- N O _ m .- M .- m U) m m m m V m N N. U) N- O M V N- In C CO M M co O C m V r N V O N- N U) V N m m 6 N. N- n m N Nr m L C m m m m I- r N- m m m m m m U) Cn (n In Cn )n Un (n )n In N N N N N N N N N N N N N N N N N N N N N N N N N N E N a co m N 1 ca m N IN C CO CO In N Cn M m CO N O CO N CO O CO CO m O O C J V ..11m O O I- U) O O Cn O O m N N N CO N I,- Q N N N6 M N O m I� 6V O m N.: N- N n N- r N- N.: r O O O O O O O O Com (p C O C C m m m m m co m m m m C O C S T U • (0 C o_ N m '� E v Q) a a L L co t -o > co co co 9 0 U) 999 > Z a a > > > C C O N O V O M CO I- N. CO M C M M m Cn CO M U) I� N M y N O C) m m m M V M m m N. m M O m In m .- N.- O m C C CO V U V m m m N M N m m m N m m (f) O V Oa) co o if) co 1� O CO (N O M CO C N N O O C C CO CO _ m 0. o C O O N N N CO M M CO V N co I- co C C O U) N N F M h T Q N O .- r r r r r N N N O CO r «) /14.01C 4.; , o r2 7 V n CO i0. ) O C U) 2a) 0 N Zo `10,'41 U• G. in 0 V) (NI N. _i CO _ . I 0 N.- CD COCO C) CO O C) CD CD O V CON. N N N- CD h V CON CO m CO .- U) CO CD CD N r 0) CD 0) CO CO CO CD = N 0) Ns OD U) N N C) CO ,.�� O O) V W 6 OD O a) 6CO (O O ,— O) ro M a) O ODto N N- N u) t0 ) CD O N C) co(O O) N LO N CO CO CO co CO N CO V V V u) u) LO u) CO (O O CD r-- r N- CO CO CD D) D) 0) O N 07 CO WNs- 0 N -z- (0 CD CD CD (O coCD CD CD coCO CD O CO CD (O (O (O CD (O (O r` r` NS r` r` , m MI M �� N N CO CO o N N O CO Y CO CO" CO N- N CA N. O O N N CD CO V OD N- .- CO N OD O CD N- Cn CD 0) Cl) C) N. 4 CL (L d V V O CO V CO 0) ,- CO N CO N- CO CO C) .- N- r- CO .- N- CO N V CO U = O = CD N .- V CO O O CO O O r- O CD CA N OD V O .- N ,- N .- O CU fo CU Z V r .- Q N 0 O) y J G 0)) 0) 0 O G Ce (n in IP Y Y a Y (Y IL' ili N N 00 00 CO N- CD N COCOCO CD CO CD C) u) CO (O CD N r CO O J J Z N c0 O C) N N CD U) CO CD N CO cO CD C) C) u) CO C) N O C) CU < < 3 < SII O 0) .- (O U) CO V s- 0D CO a) V N C) CD V O O O CD CO V CO CD C D 0 C) N O CO r V C) C) O a) a) co D) O) N 1. W CD V C) O C() r- U) CO CO H H Y N. V N V CD u) N CD U) N CA CD CO O r V CO 0 u) CO N- Ns CD > > IO 0 U E UV V V CO co co N N N .- ,- s- O O O C) O) O CO OD CO N. O uV 4 QQ E ENxuL6 (D 6 U CO uIn n Cl) 6 Cl) u) Cl) ui ui v v v v v v v V v N. OCDCOODCOOD CDOCOCOCO COCOCDODCO !0CDCDCOCD COODCOCOW Q O W jC 0 W O u) Cl) u) .n COuCO CO uCD vCl) uCl) n u-) ) D ) Cl) uco Lo uuu > H ... CO N 0) CO V C) r� CD O N N- M 0 N- CO V n O 0) CO CO CO CD CD CD • N O N CD N- CO O CA CO N C) N O N CD CO V V V ,- C) CO O CO M Cf) CO LO CO O N _ V = O CD CD N O 0) V V CO CO u) CO O d O V O N. U) V C) V Cf) 6 N N Cl) V V C) '— N. '- CO Cb cO V '— Cl) co C) ii 0) u) V V co co co co co co 6 V V u) CO N OD a) O O O O N CO C) co c D c N- r- N- N- N- N- N- N- N. N. r- N- r- N- n N- N- r� CO CO CO OD CO W co co a) L L e C) co- C) Ci co- C) C) C) co Ci CO- CO- CO- C7 C) 07 C) CO CO- C) CO- C) C) co C) C) w m a N- rn rn rn o) 0) N- a) O) D) N- N- O) rn a) 0) N- N. D) 0) N. aa)) N- N- aa)) 0) ✓ Z _ (n ui ui ui ui ui uD u) u) ui u) (n u) u) vi ui ui ui (n In In (n In N d ci -o C V � V m 'OCd2 d 7 CO N Cn D CD CO N V V N N- r' CD N CO CO CCl) O V V D CO CO 0 O 0 CO CD N N O C) V 0 V CD V CO O V CO V V CO CO CO O N OC w i U 1 W W V V Cl) N aO N CCV CCV uV N- O O N O O O Cl) V co V N. O C) O O C) CO CO N UCO V r O C) CD CD Cn u) V n ,, d 4,j, Q' T CO s- ,- N N N CO CO CO V V V V CO Cn N co co co N. N- N- CO CA O CD a Cn N CO Lo- N L. co- 6Cn Lo- in 6 u) 6 Lo CD L6 Lo- C(D co- N 6 L co- co- co - Z7.) >> o O C 2 J F r2 Z (A D W O CO CO N LO N Cn CO OD a) N N. CO CO CO N. O Cf) O V cu CO Cn Of Q CO N N CO CO N CO V CO V V CO CO CO V CO 0 CO W N- V N Cn O C) Cl) Cn CA (D C) N C) (D r- CO V V V N 6 C) N- O a) r C) c+) rt N. CO (O CD CD CO CO CO CD CD N. N. CO CD O .- N N C) C) V 0 Cn CD N- N. CD CD OD ODOD OD OD CD CD CD O CO CO CD CD O CO CA CA O a) a) O CA 0) CO CI- d C) co- C) co- C) C) C) C) co- Co- C) C) C) C) C) C) C) C) C) C) C) M co- co- co- C) I M Z Z 2 U) (0 C -.L Cl) N. CO N V 0) CO C) CO Cl) C) CO 0 C CO N N N CO h N N. .- LO Ns o V CD Ns OD C) r C) C) V U) Cn u) CO CO CO CO CD CD CD O N CD N Co O CP O N V CO a) N C) V V V V V V V V V V V V N 0) Cl) N Cl) CD CD CD CO CO CO N- N- r N- N- N- N. N. N- N- N- r� N- N- N- N- CO CO CD CU CO CO CO CO CO CO CO CO CO CO CO CO CO CO OD CO CO CO CO CO CO CO CO CO CO CO Cr, tb tO tb tb m a0 OD (O a0 CO N (D (O O fD 00 m O 00 OD (O aD N N CD CD 0 N O N CD r- CO V N COCO O CO V O CO N Ns CO N N- N CD 0 N-- O _C) CO CD (D N CD CO CO V u) u) U) N- CO LO CO Cl) Cl) u) Cn CD CO N u) N CO r- CO O N V r m O N N N N N N N N N N N O N. C) C) Cl) CO Cl) CO CO CD CO CO N- r N- N- N. N- N- N- N- r N- r r N- N- CD CD CO a) CP a) CA CP CP CP CT O CP m O) a) CP co CA O O T CA CP m O O 0) o) 0 = aD m m m m a0 a0 m (D m (D m a0 aD aD m m m a0 a0 m o m m CO 7 03 O a) 00 a) Cn CO C) O N V V CO CO O CO V CO N ,-- C) CO C) 0) CO CD V N CD CO _ O V O CD V CO C) N CD N- V N = CD V O O 7 N- N- CO CJ N C) r- O N CD m O CD C) O r. O CD Cn N V N N L CCD CO CO co CO cor-- N- n N- CD CID c N co N CO CO r N N. N- N- N- Ns N • NNNNN NNNNN NNNNIN NNNNN NNNNN N E -_ (L co N Q CO N C) O V CO CO O CO CD CO u) CO CO CT CO CD N O O 0) (D CD CD V CD J 4- 4 V O O O O O CO V CID a) a) a) a) 0) O CA CA W O .- N N- N Q O OD CO CO CO CO CO CO OD (n W CA 0) a) a) a) 0) O6 D) 6 O) N N N (N 1 (p 0) CO CO CO O CO CO CO CD CO CO CO CO CO CD N CO CA CO CO CO CO 0) 0) O O) U T U -. d (n C E d 0 < o D > co co (o o a (n o 0 0 a z ci 0_ > > > O CO CO V V 0 V O CD CO CO 0CD O N O O r CO a) CO CO N r- N Cn O N V v- N 0) V 00 CO r- O V O V V CD CD CA N- V .- Cl) C) CD 0) CO u) Cn CO T O N V V N- aD O N C) CD r r- O N N N. (O '- O cop coCO aCOO ) N CD CO N N V CO r- C) N-VC) O CO N N `- N SD V V V V CO Cn Cl) CD CD CD N- r Ns CD CO CD O 0) CO O O ,- N 0D V V CriO 0 o ,40y C .. — 0 7 r� s D c > E• y .. QI co co /ry E Q (O a) d a) CO vD_ m3 3 0 O o 0) • ill CO ,.dig Zo a co Ns m �W 0 cn y MI tg> > = a= NN. N O ga Y Y vI CL d a O Z V V 0 o 00 N c 7 J LO LO W W Q N J G 0) 0))© 0 D © '.. CO CO N !0 • Y Y Y CC CC m J J ? Q LO < < CD O CO c) ~ N m cn. > a a ce U U E 7 c x v co °'- o o 2 c_ Ca > > F- W W (1) 0) Z Cr = 0) L ui o o Y C N O EmN L L M a) a) 0 - O4) re Z W OB y . m m C0 0 c 5 v is O E 'O U U d 7 N X .co GN d r`.. ., M U m w ) U N CC y . a) 0 • >0> r Z t- o V) - F 2 Z fn O W CO y • 'C a .E CO m U O .L O n 0) Q N as Ct n f rn a a)H `" -- co m Z is o Cl) I CO > 0 T1-3 1 > o CO O >. Li: CO �. c c0 a 0 CO E ~ TS U a N so E o o N m o 0) o > d N _ oo M d E Z CO F o W _ N W CO W + @ f0 c ��j 'O 7 O U a N s- 0 N N. eA J L N Z N M M } 7 N V E .N CO co Q V a N O Ul CO N... CO CD d Q �. co.co N t (O J N ' N 8 7 O O III 8 ›.. - O • 9 U O O N. A V d L u M o N l6 7 0_N V "O CO 0 Q o d W a) 7 � I I. d L O n ,0 -0 > o o o 0 N y G y N V_ Z > > > O M Oc d ,- s- 2 O c N.. G 1I O E O o o O O - O •O c # C 1. N C c T O Oj N h N O + N N y R m O . 0 am a fn U C N • • stiv W Northing(250 usft/in) 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 § 8 8 8 8 8 88 ►t re_ F. ' 8 " 8 `0 - m - - 0 8 0- 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 M 8 ICI�� I� ` 7`,": .N 1j19-,i� : • O •� o N t7 4= 592250 'q ��= N • - � N 592250 N N �O co� � N O �.J N \\o �N N � • �� MO ssz000 >• 2 o q > m �I ssz000 O N N N Z N N �� N _ ' .V. C;l j 591750;` > .• ..-7 a>- •0,4 > 591750 i. :011 7 1 `> /7 591500 o o> o , 00 r y 591500 A N �0,� ;1 I 591250 �-wN o o N \\ \ 591250 _o ._�o apo ..o `���Z. - N'14144:..\111111111111\1*,,, \ ` 1 591000 C•, �• - o =\i`� \ �� 591000 t` \� OLL 590750 ee:av - _ �_Y'444590750 8 g a 5 Z 590500�cy-rf,. = o "";� 1 590500 < O pN���./ 7 -44 3>.>.a 590250 �� ��% /�, ,-'111(0,11 590250 m N s I a T o f 590000 o `\`.'� - 0.9' S v40$ aAdV q v 590000 o 4 589750 ' m v��` °00- , ;000 Z 589750 ma9$� N > 00 N � Nr 1 589500;'7 m N o ���• --- - 589500 589250;.:'.$ N N N d' O %. /'� b. 589250 589000' v , N 00Q 0g,. 000 589000 N o o S N o 588750 S' 588750 . j p° y o N 588500:.. - 588500 F g >V O ° 00° 0i..,01 a > c O 588250 '. No 2 °p` S 588250 C w = �' o g CD O 8 d y 588000 '' > ''.".1 - - , 588000 y m H J O o 0p°S > 00 Q lir CT V17 587750 f > - o - - 9 - ,587750 N L/ N Q L bL \_ 00,• k 587500 b� rq l�,$Sg C 587500 ci 9€ $� 'rr 00 0 �°O` OOd 0 IC F o /�/�� O 587250 CI m- J J 000 .4. > OOg -... X587250 CI 0 F 6 A V/ o O.m N `_'� W � 0 587000 Z N - 000787000 O 586750 '.o o N mo 0009 586750 4� N N N N 586500 ; 5 >5 --. °°oma 586500 1 m 586250 __._i_. _ ® 586250 0 ? I 586000 --_.. i _:. __ __ 0Q9 ® 586000 I 585750 : —___-. 1 _.. _. J. Lc) 585750 >m 585500 OOOL Q .000 a m 4 4, - o 585500 a a>>m I __- --. -IZ �_}�-* _-___ - 0009 585250 -6 4 585000 ---- o V 000Z .0 8 � 4 585250 r '-- 585000 m =. o co d 3 i 584750 __ __.. _r ® —_t o 584750 co III 584500 > I r 584500 1 co584250 —�-- ! _: Q 1. . .584250 584000 --- --.__ _� �.. -._ _ { -_ +--_ .584000 583750 - ___7__. +__ __- ® 583750 Z I a 583500 o 583500 0 C\ 583250 �.-t --- _.--Y . 583250 Pil 583000 On n g 583000 0 t.- O1 N ., _ „ _ n NN nRO , 8 NoNOOON m Ymf r N :O :ml N N N Nn im ,6:3, :43, LT LT, N N N (uyIJsn OSZ)SuPytroH • • 0 bp North America - ALASKA - BP Prudhoe Bay PB V Pad V-08 V-08 V-08 500292356800 AOGCC Post Drilling Offset Report 20 March, 2017 r' I BAKER HUGHES AOGCC Report 04.0,0 • BP • ZM.) bp Anticollision Report BHKGFIES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well V-08 Project: Prudhoe Bay TVD Reference: V-08 ACTUAL RKB @ 97.95usft(Parker272) Reference Site: PB V Pad MD Reference: V-08 ACTUAL RKB @ 97.95usft(Parker272) Site Error: 0.00usft North Reference: True Reference Well: V-08 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore V-08 Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: V-08 Offset TVD Reference: Offset Datum Reference V-08 Filter type: NO GLOBAL FILTER:Using user defined selection&filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,816.38usft Error Surface: Elliptical Conic Survey Program Date 3/20/2017 From To (usft) (usft) Survey(Wellbore) Tool Name Description 87.52 1,849.88 V-08PB1 Gyrodata GWD 12-1/4"(V-08PB GYRO-WD-SS Gyro while drilling single shots 1,904.25 2,802.86 V-08PB1 BHI OTK MWD 12-1/4"(V-08PB MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 2,830.11 2,842.56 V-O8PB1 Gyrodata GWD2 12-1/4"(V-08P GYRO-WD-SS Gyro while drilling single shots 2,942.44 10,115.86 V-08PB1 BHI OTK MWD 8-3/4"(V-08PB1 MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 10,161.97 10,854.62 V-O8PB1 BHI Navitrak MWD 6-1/8"(V-08P MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 10,866.36 12,280.93 V-08PB1 BHI ATK MWD 6-1/8"(V-08PB1) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 12,371.17 13,420.92 V-0S BHI ATK MWD 6-1/8"(V-08) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 3/20/2017 5:01:32PM Page 2 COMPASS 5000.1 Build 1318 AOGCC Report h • BP • rP�U 0 by Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well V-08 Project: Prudhoe Bay ND Reference: V-08 ACTUAL RKB @ 97.95usft(Parker272) Reference Site: PB V Pad MD Reference: V-08 ACTUAL RKB @ 97.95usft(Parker272) Site Error: 0.00usft North Reference: True Reference Well: V-08 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore V-08 Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: V-08 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB V Pad Plan V-137-Plan V-137-V-137 wp08 346.39 350.00 60.12 5.91 54.21 Pass-Major Risk Plan V-206(slot V-229)-Plan V-206-Plan#2 V-2 338.91 325.00 179.09 5.74 173.35 Pass-Major Risk Plan V-226(SL)-Plan V-226-Plan#4 V-226 829.20 825.00 84.75 12.38 72.41 Pass-Major Risk V-01-V-01-V-01 365.49 350.00 16.88 6.35 10.55 Pass-Major Risk V-02-V-02-V-02 1,378.87 1,350.00 83.54 22.13 61.43 Pass-Major Risk V-03-V-03-V-03 1,196.07 1,175.00 204.32 18.21 186.12 Pass-Major Risk V-04-V-04-V-04 756.72 725.00 161.86 12.74 149.16 Pass-Major Risk V-05-V-05-V-05 2,904.47 2,850.00 108.75 54.62 65.88 Pass-Major Risk V-07-V-07-V-07 710.44 675.00 179.11 11.60 167.59 Pass-Major Risk V-08-V-08PB1-V-08PB1 12,597.84 12,600.00 26.04 10.70 19.80 Pass-Major Risk V-100-V-100-V-100 362.78 350.00 103.95 5.58 98.38 Pass-Major Risk V-101-V-101-V-101 1,670.78 1,575.00 199.57 28.43 172.70 Pass-Major Risk V-102-V-102-V-102 785.99 750.00 179.74 13.74 166.24 Pass-Major Risk V-103-V-103-V-103 525.32 500.00 191.47 8.24 183.24 Pass-Major Risk V-104-V-104-V-104 1,828.41 1,750.00 105.42 32.77 75.11 Pass-Major Risk V-105-V-105-V-105 1,280.25 1,250.00 64.23 19.09 45.23 Pass-Major Risk V-106-V-106-V-106 753.02 725.00 170.95 11.33 159.65 Pass-Major Risk V-106-V-106A-V-106A 140.67 125,00 182.38 2.59 179.79 Pass-Major Risk V-106-V-106APB1-V-106APB1 140.67 125.00 182.38 2.59 179.79 Pass-Major Risk V-106-V-106APB2-V-106APB2 140.67 125.00 182.38 2.59 179.79 Pass-Major Risk V-106-V-106APB3-V-106APB3 140.67 125.00 182.38 2.59 179.79 Pass-Major Risk V-107-V-107-V-107 1,487.09 1,450.00 44.58 23.40 21.18 Pass-Major Risk V-108-V-108-V-108 771.26 725.00 287.88 12.42 275.57 Pass-Major Risk V-109-V-109-V-109 1,222.39 1,200.00 149.74 17.87 131.90 Pass-Major Risk V-109-V-109PB1-V-109PB1 1,222.39 1,200.00 149.74 17.87 131.90 Pass-Major Risk V-109-V-109PB2-V-109PB2 1,222.39 1,200.00 149.74 17.87 131.90 Pass-Major Risk V-111-V-111 -V-111 1,368.04 1,350.00 168.41 21.80 146.69 Pass-Major Risk V-111-V-111 PB1-V-111 PB1 1,368.04 1,350.00 168.41 21.80 146.69 Pass-Major Risk V-111-V-111 PB2-V-111 PB2 1,368.04 1,350.00 168.41 21.80 146.69 Pass-Major Risk V-111 -V-111 PB3-V-111 PB3 1,368.04 1,350.00 168.41 21.80 146.69 Pass-Major Risk V-112-V-112-V-112 504.30 475.00 253.89 9.92 243.98 Pass-Major Risk V-113-V-113-V-113 876.91 850.00 212.08 13.16 198.98 Pass-Major Risk V-114-V-114-V-114 498.61 475.00 163.06 7.79 155.32 Pass-Major Risk V-114-V-114A-V-114A 498.61 475.00 163.06 7.79 155.32 Pass-Major Risk V-114-V-114APB1-V-114APB1 498.61 475.00 163.06 7.79 155.32 Pass-Major Risk V-114-V-114APB2-V-114APB2 498.61 475.00 163.06 7.79 155.32 Pass-Major Risk V-115-V-115-V-115 290.27 275.00 135.60 4.54 131.06 Pass-Major Risk V-115-V-115L1-V-115L1 290.27 275.00 135.60 4.54 131.06 Pass-Major Risk V-115-V-115L2-V-115L2 290.27 275.00 135.60 4.54 131.06 Pass-Major Risk V-115-V-115L2PB1-V-115L2PB1 290.27 275.00 135.60 4.54 131.06 Pass-Major Risk V-115-V-115PB1-V-115PB1 290.27 275.00 135.60 4.54 131.06 Pass-Major Risk V-117-V-117-V-117 338.47 325.00 73.32 5.40 67.92 Pass-Major Risk V-117-V-117PB1-V-117PB1 338,47 325.00 73.32 5.40 67.92 Pass-Major Risk V-117-V-117PB2-V-117PB2 338.47 325.00 73.32 5.40 67.92 Pass-Major Risk V-119-V-119-V-119 994.33 975.00 149.44 15.37 134.07 Pass-Major Risk V-120-V-120-V-120 318.77 300.00 224.73 6.50 218.24 Pass-Major Risk V-121-V-121-V-121 388.18 375.00 43.03 7.51 35.52 Pass-Major Risk V-122-V-122-V-122 289.98 275.00 90.10 4.69 85.42 Pass-Major Risk V-122-V-122PB1-V-122PB1 289.98 275.00 90.10 4.69 85.41 Pass-Major Risk V-122-V-122PB2-V-122PB2 289.98 275.00 90.10 4.69 85.42 Pass-Major Risk V-123-V-123-V-123 757.13 725.00 179.59 12.03 167.64 Pass-Major Risk V-201-V-201-V-201 3,806.01 3,725.00 93.93 68.64 27.35 Pass-Major Risk V-202-V-202-V-202 1,745.27 1,700.00 38.83 31.31 7.95 Pass-Major Risk 3/20/2017 5::01:32PM Page 3 COMPASS 5000.1 Build 818 AOGCC Report • 4.0 j hh • BP legal Anticollision Report BAKER 'N HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well V-08 Project: Prudhoe Bay TVD Reference: V-08 ACTUAL RKB @ 97.95usft(Parker272) Reference Site: PB V Pad MD Reference: V-08 ACTUAL RKB @ 97.95usft(Parker272) Site Error: 0.00usft North Reference: True Reference Well: V-08 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore V-08 Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: V-08 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB V Pad V-202-V-202L1-V-202L1 1,745.27 1,700.00 38.83 31.31 7.95 Pass-Major Risk V-202-V-202L2-V-202L2 1,745.27 1,700.00 38.83 31.31 7.95 Pass-Major Risk V-203-V-203-V-203 1,360.09 1,275.00 255.74 22.88 233.54 Pass-Major Risk V-203-V-203L1-V-203L1 1,360.09 1,275.00 255.74 22.88 233.54 Pass-Major Risk V-203-V-203L2-V-203L2 1,360.09 1,275.00 255.74 22.88 233.54 Pass-Major Risk V-203-V-203L3-V-203L3 1,360.09 1,275.00 255.74 22.88 233.54 Pass-Major Risk V-203-V-203L4-V-203L4 1,360.09 1,275.00 255.74 22.88 233.54 Pass-Major Risk V-204-V-204-V-204 799.23 775.00 125.09 13.14 111.98 Pass-Major Risk V-204-V-204L1-V-204L1 799.23 775.00 125.09 13.14 111.98 Pass-Major Risk V-204-V-204L1 PB1-V-204L1 PB1 799.23 775.00 125.09 13.10 112.03 Pass-Major Risk V-204-V-204L2-V-204L2 799.23 775.00 125.09 13.10 112.03 Pass-Major Risk V-204-V-204L2PB1-V-204L2PB1 799.23 775.00 125.09 13.10 112.03 Pass-Major Risk V-204-V-204L3-V-204L3 799.23 775.00 125.09 13.10 112.03 Pass-Major Risk V-204-V-204PB1-V-204PB1 799.23 775.00 125.09 13.10 112.03 Pass-Major Risk V-204-V-204PB2-V-204PB2 799.23 775.00 125.09 13.10 112.03 Pass-Major Risk V-205-V-205-V-205 339.91 325.00 13.93 5.58 8.35 Pass-Major Risk V-205-V-205L1-V-205L1 339.91 325.00 13.93 5.58 8.35 Pass-Major Risk V-205-V-205L2-V-205L2 339.91 325.00 13.93 5.58 8.35 Pass-Major Risk V-207-V-207-V-207 518.28 500.00 241.45 7.93 233.66 Pass-Major Risk V-207-V-207L1-V-207L1 518.28 500.00 241.45 7.93 233.66 Pass-Major Risk V-207-V-207L2-V-207L2 518.28 500.00 241.45 7.93 233.66 Pass-Major Risk V-207-V-207L3-V-207L3 518.28 500.00 241.45 7.93 233.66 Pass-Major Risk V-207-V-207L4-V-207L4 518.28 500.00 241.45 7.93 233.66 Pass-Major Risk V-207-V-207L4PB1-V-207L4PB1 518.28 500.00 241.45 7.93 233.66 Pass-Major Risk V-207-V-207L4PB2-V-207L4PB2 518.28 500.00 241.45 7,93 233.66 Pass-Major Risk V-207-V-207PB1-V-207PB1 518.28 500.00 241.45 7.93 233.66 Pass-Major Risk V-210-V-210-V-210 718.03 675.00 245.89 12.04 233.97 Pass-Major Risk V-211-V-211-V-211 295.68 275.00 285.78 4.65 281.14 Pass-Major Risk V-212-V-212-V-212 628.38 600.00 178.38 9.83 168.61 Pass-Major Risk V-213-V-213-V-213 289.98 275.00 120.35 4.89 115.46 Pass-Major Risk V-213-V-213PB1-V-213PB1 289.98 275.00 120.35 4.89 115.46 Pass-Major Risk V-214-V-214-V-214 816.13 775.00 243.51 13.51 230.15 Pass-Major Risk V-214-V-214PB1-V-214PB1 1,059.71 1,006.00 220.07 21.22 199.08 Pass-Major Risk V-214-V-214PB2-V-214PB2 818.86 775.00 243.55 13.55 230.15 Pass-Major Risk V-214-V-214PB3-V-214PB3 818.86 775.00 243.55 13.55 230.15 Pass-Major Risk V-214-V-214PB4-V-214PB4 818.86 775.00 243.55 13.55 230.15 Pass-Major Risk V-215-V-215-V-215 744.36 725.00 110.66 14.33 96.33 Pass-Major Risk V-216-V-216-V-216 269.10 250.00 196.25 4.54 191.71 Pass-Major Risk V-217-V-217-V-217 364.67 350.00 28.67 6.82 21.85 Pass-Major Risk V-218-V-218-V-218 344.09 325.00 205.86 6.13 199.72 Pass-Major Risk V-219-V-219-V-219 266.27 250.00 148.98 4.21 144.78 Pass-Major Risk V-220-V-220-V-220 269.85 250.00 255.51 5.38 250.14 Pass-Major Risk V-221-V-221-V-221 656.87 625.00 179.72 11.39 168.39 Pass-Major Risk V-222-V-222-V-222 635.21 600.00 192.44 10.79 181.73 Pass-Major Risk V-223-V-223-V-223 541.89 525.00 29.26 10.74 18.53 Pass-Major Risk V-224-V-224-V-224 217.13 200.00 165.21 3.78 161.43 Pass-Major Risk V-224-V-224PB1-V-224PB1 217.13 200.00 165.21 3.78 161.43 Pass-Major Risk V-225-V-225-V-225 950.12 925.00 192.07 15,16 176.94 Pass-Major Risk V-227-V-227-V-227 469.92 450.00 233.82 7.45 226.40 Pass-Major Risk V-229-V-229-V-229 1,237.53 1,225.00 51.70 20.36 32.31 Pass-Major Risk 3/20/2017 5:01:32PM Page 4 COMPASS 5000.1 Build 81B AOGCC Repot m a Ii Q F o O O J F^ O W O Ca Q v QO a W O .I 2 W N OfO Z p F- Zoog JO ,/,,,,;;,,a , oi • /4 j N O E E .: . O7 O 1 � T w o ^ / o CC N! Nw d LL 0 -a ILL O of O O O W p U Na a -OU O n vaQ O m y > ,/iN O Oo > 3 -1 I th X N N N _ QI U T N II N N ///,N 4,r E t 2 t 2 5Qo U, v / n. U_6 ai N O ^ C x C C O I7H O eo O 5 O W O 5 o W v , . Y a) 0 0 2 N 3 O O /�; ;%; C QI O O ® . / .„...,,K.' / a o w o ' 'f E ❑ 12 �o/.S / N O. W (h E l c� p p i••In Q co Q g U aO � a- 1.0pE m a 2 rd % y . % • /I a o a a fioOu) a } Q o >-' a 0O r` 5 o 0-I 1 r� N N co N6 �,,ff C CO C E E l'' Q) 3 > o c2 3 (I) cT) TD AD W d c C Q vi N > a i.1 N > fr N ;10 N b 3 , N U U Cl) N U U 3 a `�C CD5 it '"i' °' € ! co O ` 0 o W w w a , :, o W w (0 a r-.. ' N rn ' o. -17; sia i s + : * a a o + o E E , E i d o N £N- Q " / C W U v oo r/ ` oo t; Yso 0 0 /i W a a Z j C (n N O / I- CO. M N O ,/7 "'+ / > tea N (6 a) O, O --"° N W u7 I N m r O O /i` a) a7 N ( N iI- . a E C a- E c > o�111. 0 o U t S H 0 0 4/..", y U S S 12 oo (D .0' Q . W fel x F H Z W Q O 2 ce C7 C7 Y v Q' Q Q co n N Z O m w O O . ,Ti.ti O N O 0/ 2 O Z �I1 D < U .. W w fill coo d a o o Q O —a, 1 CO O) <n O) N O a ,- ,- 1... c-i co n . r> 0) 0 ' Z 2c m W 2 E o d a. W Z a c rn .. u) _E H :U v L a' Q O. C 4E' -o a s m m rn 2 Q a E a E E S ai o E o y -o iii E 0 C a F>. .. a) U d O Ol O E T N O O_ E 65 >. N O a U) N E (i .6:' O a c C c a ..Z I- m a > �T o .Z I- of w > I.>. o c a) cm a� ' E 2 > o a a E E co La .2 'o Z' a -o Y a`, -o N b Z o_ a Y 2 CO cm N.- a O a w U m o a) a) a o a' a 3 3 m m L = a) a 2 > d a L 3 a O -, 0 0 a = a rt W a Y v) O 2 0 u. co a t Ca O 2 O 0 0 0 rn O � L N cy A L N a7 Cf N O) a) - LL a1 4L 1 a) :J " .0 W f� Q Q y D F Q Q E E a o c E E N U H J }- O O O H ) W W o @ "U N Q I - Q w 0 c = O co co F' Z c a Z w O O)N O ❑ 0 U U U L_ C a, O O O X O)N v) N n E c] CO m < r N 'n Q 92 o 2 .N 0 0 0 0 Qo " O a U o 0 0 0 0 a O 0 y N a) o o O Lo U In o O 3 -- N CO V o o v o O o O -a i N m p a3 'IC a p E v, 2 'Fa N E a) co- Q I- C x C c0 Q I- IF U I o m N 'ff ❑ 2 0 LU ` E -c N .0 I I O C oo U CO C c 1m'o (3 --- a)a) r ❑ 2 U) .o to a13 W o G a) ,QLL cro 'to Q X 4C) n L r 2 Q ,.%' E m `° u ? E mmii o d a) n o 4) S'_)U Q U) E U) a U E H -) c } N- > H 7 ,- NJ O O N Q O� N ., .. Q L N N N co E C y w a) C 01 -- ,/?'°, (7 Cc c o N N d E _ ,. O c h Q i m a� > ,- 4 ❑ 4 X -0c - o_ o ,- c P. II� w __ 2 (7) o I-0 a = Qc) a) .c a w H > Q� = a o E E e1 w 8 co; E 4 o C E E - In) U H v Q a) X X 3 > la i3 O 1 �. N: ;O U) ❑ W W U) a 5 �dj F- -Sin E al 13 D it w 5 Q c o W tt i co W o r 00 N _ O N E p m O I l'"- a) W Q W N 1„ N j D a Q -O N Q 7 Q Ci Fr' Y < Y o N. ce co N in- d 1 0 W d I 0 m > � g - a o 0 A a a Z o o. U '" `- o o M _ CO N O O Q Oi LC) > Z LL U) U) a' < O O o_ - O rn E co O p N y' 2 0 E c H -° co U J C . , > o �` 0 �' .O w 5 - �p C w Z U) 0 • Li x O O c.) 251200 o Q p o0 Lai co O i -J L a) ao 1 co J @ O Q LL • W ❑ W E E oP.-20- - 0 3 Li Z co J U IIIa) °- LL 2 _ O c o < 0. O U O YT o a) a) p N a7cv Z o w 0 3o isi O U m " I- c, = a) a) ` I= o O LL Z m w r• co o IO i I„., U a N N a) n > w ❑ Y Q Z E T Z U LL :LI) a) V Q LL N E m O W I H o W 2 ) aEi •Z o K (t t) I" d rg ❑ a n3 2Lo ai N. a T a E ,i d ai oE 0 E co co a E a) C O U 2 N N = > T coo Y v C N U Ll o 2 > O 1 a L 'II ' ' O. Y N -o ,- Cl- a7 (O W L U a W U CO ~ > > 7 y N L N O O H I LL O a } U) 0 2 0 000 ❑ M I O M 2 O = h ., Q O] CL f .1 O ^ y' N' O U a) CO O > j > a) U co E (n " Nj - z z n 0 0 Ce N i6 6O a) 2E6; n ` a T U ~ H 44 T) v E a 0 > 0j m o Ii F o a ; //.- i-§ 0 = C a z r S8 a 1 _ r 0 z I 0 c WO r J E co < co X to tJ w m i f c o a a) E m o > • a o rn E o z z I` O J 32 n N v n o. d -E., E t o o csi a) T I c z y N N N fi,,. a C O a • .NU N 0 . Um m ;' j. a« > , m ` Z pr a. "Ota2 O a = N ~ C c1 0 . 2VE n . �. C Oy OlvG : m0. C a (6 ti N U Cr W a =N G @ jC a. am • (n N G* OS S. 0 to ++ c9 E m E !m c p co E c N E 'rti 4) Doo is' U a z i U o E a, w U E E m a 2 c d 3 c C)i m m ;V N Q rn (/O) N O 0 a0 0 N O a F 3 U S F- a S 0 Y 0 2 a a ao w o < O m 0EN eL = a a O 'E U a .N z'r3 Z > d m m c n a U a s w ^ m CO E a 2 F n z a o z I; n o 92 .3 rn!t) 0 _ H 0 H(/) (%) -a 1)) E z'2 N (n • CD n 5 H ?. t 0 CO 4 (1) m - a) J 1 E o o. C N O W _ _ O o d 0 c m o W 0 e Do 3 OD N a' a _J .. a) N N ~ O d O tj v L.T. H 0 S o �o °'un ° `° Q D a a z w a E o-.7:,= o inN z Ea al N Z o `. 12 c Z O iJ 0 0 O > a 0 > z o. z z -E I a O � o c W W z al Z J F O O J I-. z 61 O O O = a) W M M n > CO 0 O) 2 a of to OI co m c O E CO W U a 0 JCO E _ z O a' ar' d N t o Q ' a , O 7 d Q I a' W = 3 N � ' N J a o .. F' a w i a��i m m Z ° ami E -62.(' c `� O E' a c7 = c7 V) .`g c E o a m a ai E a a o o o`: a` 1 0 a W 0 CO N v c H c E y 1 12 U 0 0 CO° c0i CO° H x • i a) as I a. Tti if 0 Niv> w O w O C F } u) / O ,N O) Lu V a u_ w a' ` p I y I a i O a z O a) •r g w o t o0 U Z o f- CO C.)i a ao U c ., ¢ w Z w Uo0. .. M g ao a- CO ❑ a- O ❑ 0 U J X X I o o o oN w LO0 N a .) 0 LL 0 O O nN p Q) 2 "O N a U U O uu) uO N N > aaN N a0 O OO �: O O O OM X N 0 co 'O aa W ClN) � aN7 N /„' 0) E o t u) @ w 2 m ai N 2 w m a) co oR • a C x C U C x C 0 -4-- /. E E v 0 x '= a) d x = /rt N H UO � C32 ❑ w 00 ❑ 2 ❑ w 0 `, 2 O Vii.. 2 .- /;: .# c W L /e �' ❑ Z Q f g a) 0 a a ,: 1a c) ❑ 0' o 00 / tr ;/,, o a -0 aa U ) ❑ o o a � '4 a o } Q o Y7 O , Z."-- 2'' a �/; /% N O J N N U) JF a) ! '_ N) N N f �: 2 n. 2 ' `'// z :_-.., 7i:;,/ , / O O p ` n O• E O ;j f% " 44 .s C 7 0 0 p ] N l C 0) a) N U O V) O i s� /y W 2 0 �„ 0_ N N > 0_ W u1 > a/ T (e / 3 N m C N U a) o Z Ca'. U 0 a) > K[ Lr) : N E o 0 aai x x > p aa) x x > % ',. e, C ` W N ^ C O. �. ❑ w W U) a W ❑ W W U) a U� 2 D g o CO a 0 IL N J '� D_ N ,///�'' UJ U '0 O m O '� Y Q o Y O l%/✓ ;;; U cri a m o d 0 N d "Q 0) d N > r°_Ca a `g .63 0 E -- uUi O w m co U) O /// :r ,£ Z c ,,,•N o ° I— o o O o /,,%l ', > - N N 0) cd . J u) u) a0 j/ / Im a) E -O 2 C �i • a ❑ m 0 a) , vi a) 1 Z > 0 iii ) v) ) • M E C m E %/% T j,r.; `m 0 " a) p ' 2 Z • N 3 > > Z' o > > O •i w a) ,* v a) N m m z co il-. Q 2 co a) X /,�� U 2 5 H 00 U 2 5 H ❑ 0 Q U) O w fl'I r/, LL w ❑ a 1 m 5F U 2 r w U Z Y ul Q N _ . O O U IIIa a c, = rn ;i Z J .. W w Z Q O O '0 w z I w w c a s Oo Ill _ 0 O• o m Cr J O Z a' w a a O w E N O O U) U) aJ 0 a .— M ao a) N- `s> Q.) ❑ 2' c m W 2 E O m oce w a m Z Z o ct Q Cl- ca c) c y u) 0 v y a E m E a) o) a) a) a p_ o p a a) m ai E ami ai E CI) o H p .. a)• U .a) 0 0) U O a W o a) u) E d y ' a) U) N E api c m O y ac) ac) c a Z H u°)) ❑ > T O z i ' N ❑ > a o c 2 0 > o a a E E a) '� o Z n a Y a) ur ? Z a o a) v N- N. �_ a 0 a w 0 m ' U CJ a 'X u. v) a r to O 2 C7 u. f) a r cs) O (� 0 ❑ ❑ ❑ (o i L N L N NO) a) Qi C /y O1 N CL IT: w CT „,,,/ N L% 0 E E cc = C 1 of o C E E E E j Lu i;1.- _ (i U Hol LL w oNi o n a WO Q a) - d 2 0 a) O , /j caa ao Z H Z W Cl) c r: o f � 0 U r U U U U ; LOa, EmN O O O 0 X , ) N to tll o. E � CO m m m Q , ,u N a r, ” O. N T O` y o 0 0 0 O c_ ,) fEfFE E 0_ L LL o '*;./1-"/ U aa N o a 0 N O O 0 IO] OO OO) ON OO /Y/7U / no1N '''',W.." W 0 L 2 2 • Q7 aD X U fl_ a~ — N N X f ,'2 • F- U O p)Ni ❑ 2 C3 w O � . L N ❑ o O a Z in c ./ un o ,a W o o s/ ao Q X o / E �)' umE c LL coCC 6 oa� _I s f o a)a ea o o a Ua %f O) EE / HF N> V (o I ^ f a ., N- O J J. //,' r ) 'NU % E c w m ai 'n O 6C 5 U a) a a E J/ o CS w o 0. ai � a o/ U m Ctf ? ° � � a> _ % O Lt. • c o) m -�1�, _ 0 Cl) o 4 w D_ n d 6 W > // a.15, v „ E c a) w w E c a� .a_ �, � ' o E E � w v v 0 o a) _E E � H " a) x x Cm $ H B. a+ o . a a m % o o 4 •c 3" o +� F I N < OA 'O 0" Q s.a Q i.ii c Q. 7 O_ ,: w U ¢ LL x o = LL co • NaJ d.. >ob o �q CO O) a _ o 5 0 4 0 /f co n y / p Z E o dN 1.0 c0 U > a 3 N a E °.LL_. 0 ca �O O r'J m -p E u_ i 0 E -o 0 o d 0 Z a) - LL i.LL d ') rnI'- ,, �:u),CO C < 0 0 E o a o f „, .. •a (\7ct m C C HT 4.f:.a .6 LL `. a) O /,LL .UU.. Z n /47',,. 0 O U O a) aC7) - Qw n O w 4,4; 0Om wY 00 CO Ci. ,..< L' %' a EQ CO LL ZJ 'aa) - J N j ca $2 `-' , LL (/) < ❑ LL cC / r. 112 •-. a � o r 'i O N a) O U / d O N o30 0 3 -...1-0- iv• 2O v m a mO U a a WCD= OZ , LL < 0 LL U w iN O of ,+ ct JJ w 2 al, 0 o ;m O Q - �,.' U d co CO s a) H izA>i Ito 0 Y ¢�. Z E :mac n� o al T Z 0_ ° E LL W Z /.,.. U LL (\! j E m 0 w H 2 2 L a. co "2;a7 21 Y iti 0 •- L ❑ a) 7� d co a) a) a) a v p�ilL %._ a 0 E y 0 N (O .E 4 a E - m O , L. 2 H w > > T o Y c E i., m e n _ a, o Y H co CO u) N- N 0 a :.o 2 D o d d 'O N a W I� V' CO (o L It in a i- (n O 2 0 00000 in 0 /# • (0 cr /AO ti i '42) Loi- 0_ N- E 0 W ° W 0 c " 4:0° ° F- ui I- LO cs. a UJ V 'IT'D W v 172. ',.. c\1 1 o. 5 a. 5 "'"C /2 J2: Ioji.'..L Io iig 1(2 2 00 co . a, a, ,._ z . ,,:, cl LA < W 0 a •- CO 0 0 $-t xoox Pc. (I) co .21 E . E .. a a w e) 0_ -0 u- o x:. LI_ 0 _ E 0_ -0/;. v 0 -0 .0 53 U) U) > 0 0 0 0 0 U) 0,4 0 0 0 D. ,;) ;') 5 cu c0 0 0 , 0 '5 5- • • • - co o c) o N- ..) 0 0 0 1 .a• w p w P w p U3 a) 'U Zoi 5 F) al 44, mi. c „ c 8 - a x a 0 - 0_= E' 0 - a) x " U) .- w x '• E -c o, 2 0 M 0 III o 0 M 0 La 0 c.,0, E 4.-- ‘- :.---- 0 c 02 ...,-, .. o o . , = ce 2 ce — a. E 2 2 fr: CI. .0 .0 •• CO .0 .. - a. 0 -a ii /, 0 - o >- o >- / 713 M 0 el cn t.- > Cs1 .I-n. , / .-c. a, 0 0. ' 'ai ai .E E ED a . 1-,2 ,/,A c.° g2 = — -5 o -/ 0 4.) > aic. /,...' > ,isr‘; ‘`4 •• '.= E csi 8 0 g 2 ,- ,ek 5 2 s- . -- ca o 40-/ -- u) o 4,4; ..'... 0 5 44) u) • cn s E c ° •c '5 0 a) as < 0 o - a) x .0 Lu w c7) ..-- ., ii Z l' g 'n ' , w , ',„.•..,,, E ,,„, ;:.1,0 2 ' ,=• C's/ cs.i .."7" .".,'..'...; •:,'" -0 S2 °- Et 1-- Nr i''''' ' 0 4' _7, 4.6 <-• ,- U) 0 co , IA Li. 411 Co co -6 ,.. it 0 , •ci T, 6 T, . , gi -g ci2, .. 1 ! >7)-...' , ..= ,,11 ':::',//,/,.,,'','-z; .. i -.°! .i :1• : .D , 1 ‘ o< ixt ,,, ! : "). , a-/- . - ,-,5- g 0 5120004 o t 12 0 o .r-,, .a2 w< 0 c; , , , .. :."'":, . / _1 1.11 'CB CO LL w o w 3 °- : '- . • z -co _. c..) -- , ‘ . 4 a o r,.__.^ /,t'., •, , .... O 6i 0 ',,, 111.3) CV .`,..,.'4 s2. ' 8 '- ' 64 •-.7. '. ' a, 9-- 0 0 in 1 - 9 1 WW ..,.. u_ - 0 0 ...=..-Q4 ,,if.,, wZi- <I ,:' 0t) 8 2 2 q o oc7 . . I-- 9 = ee re u) 0 Ca 1_, 0 1:1- ,- .- co a) E > CO 0 Wz a) . •6 ›, z cc 0 z E ET, 9 Wis ClELF E. ,_ 2. — .f.-4) . ;if- Z 0 cc CC 1 73 --g 0 if as w to 6 .- ;,; -i6 E 0 iii' •• 0 E 0 a) ..r) C cr- R-, ..° E i° a) o •- a) E 0 a) = -• a) E ..-4 13 I0 •• I- 01- a j1- W 73 l' (I) el ' w 7 -• ) 0) Cl) .,-, ..- n > 0 z g‘ 33 > g,- . o - •c E •s°'. g 'E D 0 •• a) •-• I° '''' o - a) .- I- ‘-'- n 1.0 r•- (0 Cl. C.) 0_ W 0 CO 7 7 5 T.) WI -.2 ' a) 0 = '= $2 CO ....C. = a) F- 1 171- CT) a_ 5- COO 2 0 IL (7) a. - COO m O 0000 C ° ao I m 3 '- � E — O E C'n 113- v C O v L Q ilL — C LL Q o a3 d N o N 'O '3 O O a V E = H �. _ 2 -.N 2 m2 m .a co U ul co F�..'o Em a, - Em mD '/ a0. l U CD 0 0 l as4 ^ a� —° o ^ a� L p 0 U a V — -- H- n O a3 CO 5. m 0 0 O V ;, N O) fyr `3 v E n co co 0 ,...0,".04Via) aLL LL IE N j- U '-c o 2 n0 p a 1 w o r r N a LL A CO CO US. ¢ X U30) � m cmgE a0 a 2 m E a ' az Nf 1 a E m co c E %/ f N o (a LL d a LL _ a s U, M C t7a) N m m : m o ,i m N y d > a a% m g ' z, a n E Lv m a v) E E lU 2 V m a '�O Y Ll m m �... Y a < /,, a m a m 8 ` 0, y m E . E ft. E 1 I N J ma E r ma t£ t ;F; , / Y U CD c6 H d H 11 Q N w ao • N d ' Lb N p m N ao > � � �, a,1._ � N � a- � a > 2i = a Fh 0 Cl_ CO m a3 E 1-0 2 a a) z > a a c,1,-- ca a HH a H — a m a lr w CO 2 Cl) ii c _ E o fl- c E o fl- O N 03 � O c' N a1 'C o o m , a o f m y _ x �' 2 m N aJ x a' n � l" O (a a 7 N — Fc' N `. O g 1-4 v i G; w w r 00 C O C �% / a a o O a a 2 . F, 12F o co upQ � Q' .o Hr m QOLY � 1 w `� W L1 N O N ^ a) N ^ l0 E a- E of N m E � E . �' 2 O I > d — > Ll N O U H F"�_ w Z as a a W co 0 J H Z H� UJ O ,TW w H. 1> 1 us_ csc 0 co co U O E ai m Z in U n in c - <o 0 TT) -IS Cl a I g a O a CL o i LL w LT- a C T U Ll CO a) H g ti:... O c a 0 0. III 0 CO co CO < • • \ § }0 \ . zz ',, ce o ) o _ ) \ H 03 _ . - _ - / 0 I- { k ) / . O. co < j ) . \ — 133 En 2 .w z z ] £ z J (si� 4 a) a �§ 03 - ; 2 : _ ) ƒ / t ƒ $ I J / \ ¥ t - \ f ( ) \ k . > a ± 2 ƒ _ _ t ƒ . - m 7 2 | ) ) f ƒ 0 b- 2 k § 3 E § } % _ \ t 3 m ` _ ) \ ^ E ! o " | « [ \ a)0 11- - } J I 0 < 0 7kzg § § \ / kkz \ f 644 G / Z ) © S i } jf 0 1C Ca § ) 0 I I z\ to - gi e . . _ - 0 0i 0 > z z z f ol = E 0 \ — _ ° ce SI k % - 0 ! > \ 0 - w , 2 ƒ /E ) 1 j \ - z0 a � VIst o § CI ? a & @ : ) > > ( Io a .. a ! / E \ $ P. O_ o a cn » } o § % * 0 2 0 r . o\ 3 G t \ ƒ o E 0 a o a a ± N Q D, f,; I5 e w v W v N. • 0 0 'c CC i o 2 0 0 0 o c N w • F W O - Gr.. O M - C o. < O_ Q C �',/� :, ., n U O 0 a Cl)O0 U 'f/� i,,..-yip d No H W CD Z UJ CD /.. O 'C CO [o N CO m ❑ W ao 0 W 0 U U U co i//;; X O O O X Y a o f, m m m o N E E Q Q 49"V N O` a) o. _ 0 0 0 G CO o .0 lL 0 .O W 0 =f'Ff/" O U U -O U / O O O O C O cn I a) co N_ a) – „ 0 O O D N f O O' ' ' co. o b" NN ;;NN O N O VisE v a. a)E .N,. ,, W '`� c x c U c x c �. %.. M j _, 0 2 ❑ W c, a) x d x a O ❑ 2 ❑ W O P d 2 o o lee O O , /� / O,.hg w o ga ,/,/, a) 'aQM Z, E uO' `RX ' a -rr ,44 a 15 o a W ;j % c In CC <n j7 � 1j CUE , a n O .0 a /a `'... 0 -6 ci_ D o n o 2 0 1. g U1 ai E p ../nO J N m /rwN N a) a N M C E M aN 2 QO U � NN 2O CO O" > — > %,} i o Q0 ; ❑ ct I o m N. c c O. t%0 Cl) O 0 N o' 0, m` � a o > a iii m >U? d w o v N ix , ,. rn a 4.1). o * a) x x > a.. a) x x2 > ;r" � �� i . '' v ❑ .a ❑ w W in a ❑ W w 0) a a a : a m m "3 5 Y I ai O.CL ❑ W C.: ,r,,, a 'L" V ! N = N � K �/. 1- co .0 o / o Q o @ m TI) a -2,3. rt; N d N ,,, O. .n e- O > O N Q O O p O j 4 d M Z o C .(/) n 4') O N O a O , J/, > .a..) N 16 a) l CD O) • 444 Z I> 0 In r A.';; tiO N O N ,//' a) d 75 .N o N , ;% W> O ' i > O ` o r7> Z > .arCm m im a) � Q x sc x c T) ' TS 2 1-- W Ua S 8 0Io a) 9i = O ¢ LLO0 •- Ho / CD a O 0 mLL 0 W '%l Z J cn (aQ /r/ < W ❑ > 0 / W O_ r� W ? Z U N 0 Z W a) N c O 2 uJ O z p w 0 w a N o `/ N O) / C— C7 ❑ .. W W Z O O ,fr i o 2 0 O €. Q Q o CO N o ' iao O U W' z w a CI- o w co o /� ,f O 2 O_' C' d .. `f U) O) N. , 0 c, M N "'j/r, N I- > ❑ Z ns Z E o �, Z as W fn ,111 Z N m Y a .. o w c rn E '': U v 2 O O < a) c C U ': a) v U a a aa)) a) a ri, 5 2 0 .. o in E E _ -o E ° a+ -o E c a R,- ',,.. .. U d o rn o 3 a N o iu In -E o_ U iu iA . E a°i c m O a aci aci .5 c 2 ,2 ~ N = > T o 2 IT o = > a o C7 E 1> o 'a z-. E E a) wo 'a 'a Ts c• 0 -o Y a`) a u) 'a Z 0 a Y CO`a) a w CO m co 0 O °- W O m ' U ci a c ce 'M N a Y u) O 2 C7 LL 2 a } w O 2 c� 0 0 0 0 CO N . 6 • a N / .L.. N ! N E q1 f oc L- ) N c C LL Q t co 4 j To_- Li. U d " m �,', n r, E E T° 3 � ` a o O o a .nom E N U = M /' . o zA z zmD —t.„ '”; -°rn En U 0 Q. � d N „r m �N, o al `s v ^ N 4,4 0 N f Eoa 2a � a m 0 o ' ,.,/;/ ~ HN N aD ' E ..0 F _ N >%/ m (O /! N H wWV E Om � a f �NN ...4.44..; a zE , c,_ tN C °") r U o -6 E j FO = ' 0 N aw.. Cs/ c al • 55 -.- 5.' .i os ii3 W O C J 4444 -c 5 ;4 2� (n Q �_I X o Cl)t a m o 2 `u444 U O_v ' so E ' a °� m E c 2 i H z o f N > " x rn rn 0. E Z Z '%44,,,,,',.//7/ O J r .Q N F v 0_ O. .t... 7 o f N �+ U E u', .-c-7; ' LL a o .'f O (h c s F' O N 0 d o d . a Zm '12 UL i9 a o o-, 2 iE a y Po Uo- • 44 UE h: HI y c m m o r $ r a /0 N IP_ c$ w E m mE r V 14 d H H o oaEE U > >UP vumu N N mN03 c E co E o ° d N.- Qp', -a m o_ CO ; E 3 U - D ua 3 W ''''//,41.• n o °' } U j U z OH -, ^ s H w m co N o ❑atcE o d0 o ZU tg 'QO •• o * r° a)) a aa M E a in '%,, n.> a v °' "E- - Z ,4 ' E ami -o 2 rn s C o E 2 in h J N LL N E H o m Z �n ❑ m O = ` /. O m ( .0 J O N 7 it) in LuO ii LL 1-- O 2 r 3 2 C O N N n O 6 N N E LL o a Z N o W v a o 130 In o N C N a`) o E o O� Ea ^ R CON r' H a, o > d d O N O. --,z• N ' 2 O U W Z z Z W o c in c >. a H o E m m L° o wo c t in m'p w I-- a) LL- in U V m rNi E i , Z oO C 0. 'CB v ,�€ U CO Q 'O - N 0) i 2 ui .. o u? 2 _= c 10 4' a -= c a >. `o E °° a �` co LI- E °' c °ii 2 a°i E U l0 O o .t... N 3 d0 3 O C O .O > O d L O r d IA Ncu x N 'O "O d d d .,.i .-U d W U ¢7 H (n C H H U U CO O CO F� S • • Davies, Stephen F (DOA) From: Lastufka,Joseph N <Joseph.Lastufka©bp.com> Sent: Tuesday,April 18, 2017 9:06 AM To: Davies, Stephen F (DOA) Subject: PTD#216-113 Surface location correction Steve, I just noticed on the Permit to Drill for V-08 (PTD#216-113),that the surface location offset 591' FSL should have been labeled as FNL.The correction on the Completion Report will be 4689' FSL which matches the As-Built offset. Please let me know if you have any questions or concerns. I appreciate your help. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 vv BP Exploration Alaskal900 E. Benson Blvd.IRoom: 788DIAnchorage, AK 11, • 21 61 13 28074 WELL LOG Ti4ANSM/77AL RECEWED DATA LOGGED PROACTIVE DIAGNOSTIC SERVICES, INC. 3 /1.O/2017 k BENDER MAR 162017 To: AOGCC AOGCC Makana Bender 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Merion Kendall LR2— 1 900 Benson Blvd. Anchorage, AK 99508 gancpdca.bp.com and ProActive Diagnostic Services, Inc. Attn: Ryan C. Rupe 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 1) LeakPointTM Survey 23-Feb-17 V-08 BL /CD 50-029-23568-00 2) Signed : v Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGE f MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D\Achives\MasterTemplateFiles\Templates\Distribution\TransmittalSheets\BP_Transmit.docx Loepp, Victoria T (DOA) From: Sperry, Nathan <Nathan.Sperry@bp.com> Sent: Monday, March 06,2017 9:26 AM To: Loepp,Victoria T(DOA) Cc: Lastufka,Joseph N Subject: PTD 216-113 V-08 Follow Up Flag: Follow up Flag Status: Flagged Hi Victoria, I'm writing to request approval to switch our production liner cement blend from 15.8ppg Class G to 8.6ppg BiModal cement. The original plan was to pump 99.6 bbls, 559 cuft,482 sacks of 15.8ppg class G to fully cement the liner. The proposed plan is to pump a minimum of 99.6 bbls, 559 cuft, 169 sacks of 8.6ppg BiModal (yield 3.32 cuft/sk)cement to fully cement the liner. We are proposing switching to lightweight cement to lower our ECD's which in turn will reduce the risk of lost circulation after cement exits the shoe. Please let me know if this is approved. Regards, Nathan Sperry Drilling Engineer C: (907)268-8416 0: (907)564-4258 Nti�� f 1Ssa G h ; i 1 1110 pro ai6 1,3 Loepp, Victoria T (DOA) From: Sperry, Nathan <Nathan.Sperry@bp.com> Sent: Friday, February 24, 2017 10:30 AM To: Loepp,Victoria T(DOA) Cc: Lastufka,Joseph N;Tambe,Abhijeet;Allen, Kenneth W Subject: RE:20 AAC 25.030.Casing and Cementing Question, PTD 216-113 well V-08 Follow Up Flag: Follow up Flag Status: Flagged Thank you. Regards, Nathan Sperry Drilling EngineerSCANNED "°' I ` `I C: (907)268-8416 0: (907)564-4258 From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent: Friday, February 24,2017 10:28 AM To:Sperry, Nathan<Nathan.Sperry@bp.com> Cc:Lastufka,Joseph N<Joseph.Lastufka@bp.com>;Tambe,Abhijeet<ABHIJEET.TAMBE@bp.com>;Allen, Kenneth W <Kenneth.Allen@bp.com> Subject: RE: 20 MC 25.030. Casing and Cementing Question, PTD 216-113 well V-08 Please update your approved PTD with this approved change. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp a(.alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loeco@alaska.gov From: Loepp,Victoria T(DOA) Sent: Friday, February 24,2017 10:27 AM To:Sperry, Nathan<Nathan.Sperry@bp.com> Cc: Lastufka,Joseph N<Joseph.Lastufka@bp.com>;Tambe,Abhijeet<ABHIJEET.TAMBE@bp.com>;Allen, Kenneth W 1 • r <Kenneth.Allen@bp.com> Subject: RE:20 MC 25.030. Casing and Cementing Question, PTD 216-113 well V-08 Nathan, This 2"d stage cement plan as described below is acceptable. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp@alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,Including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victorialoem@alaska.gov From:Sperry, Nathan Finailto:Nathan.Sperry@bp.comj Sent: Friday, February 24,2017 10:14 AM To: Loepp,Victoria T(DOA)<victoria.Ioepp(a@alaska.gov> Cc: Lastufka,Joseph N<Joseph.Lastufka@bp.com>;Tambe,Abhijeet<ABHIJEET.TAMBE@bp.com>;Allen, Kenneth W <Kenneth.Allen@bp.com> Subject: RE: 20 MC 25.030. Casing and Cementing Question, PTD 216-113 well V-08 Victoria, The purpose of this e-mail is to clarify that the e-mail communication below is for well V-08(PTD 216-113). Parker 272 is currently on V-08. Our original plan per the approved PTD was to pump a single stage cement job and to bring TOC to 500' below the surface casing shoe. We have a weak zone in the Schrader Bluff(11.52 predicted fracture gradient in the Schrader OA interval). After Abhijeet Tambe's communication below,we altered our plan to pump a 2-stage cement job and to bring TOC of stage two no less than 500'above the Schrader Bluff. We pumped our first stage and brought our TOC 1000'above the Kuparuk as planned. We are getting ready to pump the second stage.We plan to bring the top of cement to 3,962' MD. This would increase the 500'(previously approved length)to 750'above the Schrader Bluff. The bottom of cement will be at 4,832' MD.The column length is planned to be 870' MD. The plan is to pump 34 bbls of 11.5ppg LiteCrete(~188.9 cubic feet,^'109 sacks). Please see the attached schematic for a description of the cement columns relative to the reservoirs. We will call you shortly to discuss. Regards, 2 Nathan Sperry Drilling Engineer C: (907)268-8416 0: (907)564-4258 From:Tambe,Abhijeet Sent:Tuesday,January 10, 2017 2:52 PM To:Sperry, Nathan<Nathan.Sperry@bp.com> Cc: Lastufka,Joseph N<Joseph.Lastufka@bp.com> Subject: FW:20 MC 25.030.Casing and Cementing Question Nate, No need to fill entire annulus. Here is the confirmation from Victoria. Abhijeet From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent: Tuesday,January 10, 2017 2:46 PM To:Tambe, Abhijeet Subject: RE: 20 MC 25.030. Casing and Cementing Question Abhijeet, Your proposal is acceptable without filling the entire annular space from the casing shoe. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loeppalaska.qov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loem@alaska.gov From:Tambe,Abhijeet (mailto:ABHIJEET.TAMBE@bp.com] Sent:Tuesday,January 10,2017 2:41 PM To: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov> Cc: Lastufka,Joseph N<Joseph.Lastufka@bp.com> Subject:20 MC 25.030.Casing and Cementing Question Hi Victoria, 3 41. 4111 Code 20 MC 25.030(5)states: (5) intermediate and production casing must be cemented with sufficient cement to fill the annular space from the casing shoe to a minimum of 500 feet above all significant hydrocarbon zones and abnormally geo-pressured strata or, if zonal coverage is not required under(a)of this section,from the casing shoe to a minimum of 500 feet above the casing shoe;if indications of improper cementing exist,such as lost returns,or if the formation integrity test shows an inadequate cement job, remedial action must be taken. On an upcoming well we have Schrader Bluff(SB)and Kuparuk.To comply with the regs above,we are planning to bring TOC at least 500 ft above Schrader. However, based on recent static pressure survey we realized we cannot lift cement above SB due to lower than anticipated frac pressure.So that is driving us to plan for a two stage cement job. During the first stage job we will bring cement min. 1000 ft above Kuparuk.And we were thinking of setting the stage tool just above the low frac pressure zone and circulate cement above SB to be compliant. Is this acceptable?Or per the requirement we need to fill the entire annular space from the casing shoe?? Thanks in advance. Abhijeet Tambe GWO Alaska BP America 900 E. Benson Blvd. I Anchorage,AK 99508 direct: +1 907 564 4993 I cell: +1 907 331 9184 � Abhijeet.TambePbp.com 4 . . VVELLHEAD= ID V-0 8 IIKNOTES: GLEG: °@ '****4-1/2"CHROME ACTUATOR= PROPC)SAL TBG&LNR*** OKB.REV= BF.ELEV= 11/1 A KOP= V 411 1,4 ....% M 1 Max Angle= *© ' !VV 40 94.4 —2,200 --.1('.;1/7"HFS X NP,ID,-3 813" I l i Datum RD= 401 V' '%4 GAS LIFT IANDRELS — '40 Ole IlitumTVD= 8800'SS Ii,'' — V'4, irj STI MD 'IVO DEV TYPE VLV LATCH PORT DATE , 20'X 30'CONDUCTOR,133#,X-56, H —120' !0, e N 1 Et=18.750' 9-5/8"CSG,40#,L-80 HYD 563,ID=8.835" H —2,914' WI . 11,11 4i14. '11 ESTIMATED TOP OF CEMENT(STAGE 2) - 3,962' to" ‘11i 41, 4.ik kill 4IP 411° VIII At al .it. DPZ 1 - Schrader - 4712'-5772' MD I .t; MATED TOP OF CEMENT(STAGE 1) H —6,660' e- i 24 SHALE (HRZ & KLB) 7309 -7660' MD 41 bilk kinili 4, 4, Olik 1 IA „lil ti* .91i It% 4, 41.1 DPZ 2 - Kuparuk - 7660'-8083' MD ip ik ii. SHALE (MLV & KNG) 8083'-10140' MD 4r, IIII 1014 40' b• 'Ili ft ; : ,.; :(:''I,'' cH 401. I lb. 41" a dic ' Cl;,(:,:'('' 1 11/2" NI I 11'11 1 Ofri ...:01 I.04 ,',;(•(,' (' '',A. 111;'"t It 1 10 i I'l Y(I14E1 )11 AP 4 I -% , -;H, ,j--r.ii, 1 1 x‘N mr,II, firii /i.•1112" iri.(:. r(,:r.:,.im1,.m vAm ic,i . H , H:1 ,1 ' be 'V ' 1111111111111111111K" .01152 bpi,11) 3 05 1` C :7 0-14 %AI tpilli,"- 1i' N') ',," 021<<I NI). /21.1 it 1 ,.' , I/''1 ki. -1 -.1() ).4•1' 4/P.-•'.III biti ti 4,6tili , 1,.;,i::;r, —11 1 f?.•w i 1(,-;.ill :', W,t el%#' Illfirik li,-,4 Ilk 16. I.ik 4,4'41, 41,411/1P 4 I.%111, Ilk %A 411.4'1, 41,411h-4,1 4q b•'41*4! 'Th illi 4'al• 41,411.41,4 b•Ilk !IlkAllk lio N.Ilk ' lir 4,40 • Ili de I 4,4 DPZ 3 - Sag/Ivishak - 10140' MD-(TD) r C4..tt.,,;-teW,I:ito VANI 4441'I IC. --I ,10,ri; 4014 4,4 -'1 Ai itNt3 bpi.II): Ci.21G,' 49' 4,4 14. 4t 4'4 % ilk 14 FERFORATION SUMMARY II3 I I CE ()IN>001/(YIY). 4, "ille 4, A INK A A.11.11(.4'II ft: '44t if. Note:Refer to Production 06 for historical peri data 4iP‘ 'kb II)11 1A/1‘,1 c'1 ,1:,,, :.1 I( /I ',()', 4* 4, 4* 4*4 ak 4# if,if .." 4# 4,4 .0 if % 14. 4* 4*4 1. 4* 4.4 4, 4,4 hIP — , ,,' , o,' ..........4 4' +.114*Se 4-1/2"LM,12.6#,13CR-80 HYD 563, —I ^14,067 .0152 bpf,13=3.958" DATE REV BY COWA3NITS DATE REV BY COMENTS PRUDHOE BAY UNIT 1?/(i/111!: JL BOLD PROPOSAL WELL.: V-08 PERMT Ib: AR No: 50-029 00 l(: I. NI,; I„ IN' ,' ' IIVVI BP Exploration(Alaska) • • prD Loepp, Victoria T (DOA) From: Sperry, Nathan <Nathan.Sperry@bp.com> Sent: Saturday, February 04, 2017 3:01 PM To: Loepp,Victoria T (DOA) Cc: Lastufka,Joseph N Subject: PTD#216-113 V-08 Follow Up Flag: Follow up Flag Status: Flagged Hi Victoria, I am writing to let you know that we have updated the MASP calculation for V-08. The PPFG was recently updated by our subsurface team. We now expect the pore pressure in the Sag River to 8.36ppg. We expect the PP in the Ivishak to be 8.28. The MASP in the intermediate interval is 2,931 psi considering an 8.36ppg pore pressure in the Sag River. The MASP in the production interval is 2,956 psi considering an 8.28ppg pore pressure in the Ivishak. Please let me know if you need any additional information from us. Regards, Nathan Sperry Drilling Engineer C: (907)268-8416 0: (907) 564-4258 1 OF 771� • • 44,A1/ �s.), THE STATE Alaska Oil and Gas of ® KA Conservation Commission _ 333 West Seventh Avenue 1' GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 `*+'' Main: 907.279.1433 ®F A 61iFax: 907.276.7542 www.aogcc.alaska.gov Ken Allen Drilling Supervisor BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU V-08 BP Exploration(Alaska), Inc. Permit to Drill Number: 216-113 Surface Location: 591' FSL, 3646' FWL, SEC. 11, Ti IN, R11E, UM Bottomhole Location: 3335' FSL, 3110' FEL, SEC. 03, T11N, R11E, UM Dear Mr. Allen: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20,Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20,Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy P. Foerster Chair DATED this day of October, 2016. lcVCIVCLI STATE OF ALASKA SEP 0 7 2016 •LASKA OIL AND GAS CONSERVATION COMMIS PERMIT TO DRILL 20 AAC 25.005 A OGCC 1 a. Type of Work: 1 b. Proposed Well Class: Exploratory-Gas 0 Service-WAG ❑ Service-Disp 0 1 c.Specify if well is proposed for: Drill RI Lateral 0 Stratigraphic Test ❑ Development-Oil p ' Service-Winj ❑ Single Zone Q ' Coalbed Gas ❑ Gas Hydrates 0 Redrill ❑ Reentry 0 Exploratory-Oil 0 Development-Gas El Service-Supply El Multiple Zone❑ Geothermal ❑ Shale Gas 0 2. Operator Name: 5. Bond Blanket I1 Single Well ❑ 11. Well Name and Number: BP Exploration(Alaska),Inc Bond No. 29S105380 - PBU V-08 - 3 Address: 12. Field/Pool(s): 6. Proposed Depth: (s) P.O.Box 196612 Anchorage,AK 99519-6612 MD: 14067' TVD: 8951' ' PRUDHOE BAY,PRUDHOE 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): OIL ADL 028240&028241 Surface: 591'FSL,3646'FWL,Sec.11,T11N,R11E,UM 8. Land Use Permit: 13. Approximate spud date: Top of Productive Horizon: 3199'FSL,371'FWL,Sec.02,T11N,R11E,UM 00-001 November 10,2016 Total Depth: 3335'FSL,3110'FEL,Sec.03,T11N,R11E,UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 7300 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10. KB Elevation above MSL: 100.95 "feet 15. Distance to Nearest Well Open Surface:x- 590669 ' y- 5969937 " Zone - ASP 4 GL Elevation above MSL: 54'feet t1 00me Pool: 1400 16. Deviated wells: Kickoff Depth: 300 feet 17. Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 106 degrees Downhole: 3541 • Surface: 2672 ' 18. Casing Program: Specifications Top-Setting Depth-Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42., 20" 129# A-53 80' Surface Surface 80' 80' 260 sx Arctic Set(Approx.) 12-1/4" 9-5/8" 40# L-80 Hvdril 563 2914' Surface Surface 2914' • 2751' 1197 sx DeepCrete,219 sx Class'G' 8-3/4" 7" 26# L-80 VamTop HC 10187' Surface Surface 10187' 8759' 793 sx LiteCrete,106 sx Class'G' 6-1/8" 4-1/2" 12.6# 13Cr85 Hydril 563 4030' 10041' 8632' 14067' " 8951' 482 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effect.Depth MD(ft): Effect.Depth TVD(ft): Junk(measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Parfnratinn Depth Mf](ft)• IPerfnratinn flepth TV1 (ft). 20.Attachments Property Plat ❑ BOP Sketch IRI Drilling Program IRE Time v.Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program I1 20 AAC 25.050 requirements O 21. Verbal Approval: Commission Representative: Date 22.I hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Sperry,Nathan from without prior written approval. Email Nathan.Sperry@bp.com Printed Name Ken Allen Title Drilling Supervisor Signature -. CT'------ - Phone +1 907 564 4366 Date r7 /Z//4„, Commission Use Only Permit to Drill / //•2 rt pproval See cover letter for other Number: �/ - ( / API Number: 50-C_.Zf Z3S( ' ` te: \p-',Lrj_`(e... requirements: Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shales: Other: 130P 6 t D (9 1 -1- Samples req'd: Yes 0 No rid/ Mud log req'd: Yes 0 No E f--ylY 1JIe 0"-- Kt-✓e' -17tr- ��5" H2S measures Yes I No 0 Directional svy req'd: Yes PZ No El 25-0c)19 -f-" / Spacing exception req'd: Yes 0 No M Inclination-only svy req'd: Yes ❑ No [it F<o CA, J c,--cl oL 1 C Il aL r i, a t�C C Gc J >r r.2 e"'0il < ((]U Ci r J /' Post initial injection MIT req'd: Yes ❑ No 0 , cdr� J/Ivl7a0„I c2,577033 APPROVED BY Approved by 4. COMMISSIONER THE COMMISSION Date/b _ZS-/ V71- /6/2+/Ho "s Form 10-401 Revised 11/2015 This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit Form and ORIGINAL df ���� Attach....- mentin Du bp • • To: Alaska Oil &Gas Conservation Commission From: Nathan Sperry, ODE Date: September 7, 2016 RE: V-08 Permit to Drill The V-08 well is scheduled to be drilled by Parker 272 in January 2017. This grassroots well is a horizontal producer targeting the Ivishak Zone 4 sands. The planned well is a three string, ultra- slimhole design using a 9-5/8"surface casing, 7" intermediate casing, and 4-1/2" production liner. The surface casing will be set in the SV1 shale. The intermediate casing will be set at the top of the Sag - River, and the production interval will be completed with a cemented and perforated liner. The maximum anticipated surface pressure from the Ivishak Zone 4 with a full column of gas from TD to surface is 2,657 psi (assumes 7.7 ppg EMW most likely pore pressure and a 0.1 psi/ft gas - gradient). The well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack(3 rams and an annular). The BOP rams and annular will be tested to 3,500 psi. A detailed operations summary is included with the permit application. If there are any questions concerning information on V-08, please do not hesitate to use the contact information below. Nathan Sperry Office: (907) 564-4258 Cell: (907) 268-8416 Email: Nathan.Sperry@bp.com Attachments: Well Bore Schematic Diverter Line Layout Diagram Proposed Completion As-Staked Survey Directional Package Well Head Schematic BOPE Schematic 272 Tree Schematic 4-1/16" V-08 PTD 1 9/7/2016 • • Planned Well Summary Wet Well V-08 • Type Producer ' Object ve lvishak Current Status Grass Roots Well Estimated Start Date: 11/10/2016 Time to Complete: 28.6 Days Northing Easting Offsets TRS Surface Location 5,969,937 590,669 591.4' FWL 3645.8' 11N 11E Sec 11 • Northing Easting TVDss Offsets TRS Tgt 3 5,973,688 587,345 8,645 2080.4' FNL/ 370.9' 11N 11 E Sec 2 TSAD FWL Tgt 6 5,973,785 583,863 8,850 1944.0' FNL/2170.0' 11N 11 E Sec 3 BHL FWL Planned KOP: 300' MD , Planned TD: 14,067' MD/8,850' TVDss Rig: Parker 272 • GL-RT: 47.1 RTE (ref MSL): 100.95 ' Directional - Baker WPO9b KOP: 300' MD -33.7° in the surface hole Maximum Hole Angle: -36.7° in the intermediate section 105.6° in the production section Close Approach Wells: All offset wells pass BP Anti-collision Scan Criteria. Survey Program: Surface to 2000' MD = GYRO - 2000' MD to TD = MWD+IFR+MS Nearest Property Line: -7,300' Nearest Well within Pool: -1,400' V-08 PTD 2 9/7/2016 0 • Formation Tops and Pore Pressure Estimate (SOR) Estimated Most Likely Fluid Pore Formation Formation Pressure Type (TVDss) (EMW ppg) (for sands) G1 242 8.45 SV6 886 8.45 EOCU 1445 8.45 SV5 1543 8.45 Hydrates SV4 1674 8.45 Hydrates BPRF 1705 8.6 Hydrates SV3 2062 8.6 Hydrates SV2 2233 8.6 Hydrates SV1 2553 9 Hydrates UG4 2847 9 Hydrates/Free Gas UG4A 2877 8.9 Free Gas/HO/ Water UG3 3220 8.8 HO/Water UG1 3659 8.75 HO/Water UG Ma 3895 8.75 HO/Water UG_Mb1 3936 8.71 HO/Water UG- 4070 8.68 HO/Water Na 4132 8.76 Viscous Oil/Water Nb 4155 8.75 Viscous Oil/Water OA 4294 8.0 Viscous Oil/Water OBa 4366 7.4 Viscous Oil/Water OBb 4403 7.5 Viscous Oil/Water OBc 4456 7.5 Viscous Oil/Water OBd 4500 7.3 Viscous Oil/Water OBe 4554 8.6 Viscous Oil/Water OBf 4604 8.6 Viscous Oil/Water CM3/Base_OBf 4653 8.6 Viscous Oil/Water CM2 4952 9.4 C M 1 5642 9.6 HRZ 6211 10 TKLB 6393 10 TKC4 6479 9.67 Light Oil/MI LCU/TKB/TKA 6640 9.78 Light Oil/MI TKA5 6767 9.78 Light Oil/MI TMLV 6830 10 TKNG 7589 10 TJF 7717 10 TJE 7973 10 TJD 8144 10 TJC 8416 10.2 TJB 8489 10.2 TJA 8548 10.2 TSGR 8654 7.86 Free Gas TSHU 8690 7.83 Free Gas PGOC 8765 7.83 TEIL 8818 7.7 Oil/Water TSAD 8845 7.7 Oil/Water 45N 8859 7.7 Oil/Water 41N 9014 7.7 Oil/Water , V-08 PTD 3 9/7/2016 . • Casing/Tubing Program Hole Size Liner/ Wt/Ft Grade Conn Length Top Bottom Tbg O.D. MD/TVDss MD/TVDss 42" 20"x 34" 129# A-53 - 80' Surface 80'/80' 12-1/4" 9-5/8" 40# L-80 HYD 563 2,914' Surface 2,914'/2,650' 8-3/4" 7" 26# L-80 VamTop HC 10,187' Surface 10,187'/8,658' 6-1/8" 4%" 12.6# 13Cr-85 Vam HTTC 4,030' 10,041'/8,531' 14,067'/8,850' (150' lap) Tubing 4'/2' 12.6# 13Cr-85 VamTop 10,036' Surface 10,046'/8,535' (-5' into liner TBS) Mud Program Surface Mud Properties: MaxDril-N 12-1/4" Hole Section LSR-YP Depth Interval Density PV(cp) (lb/1 Oft2) API FL (2x3-6) pH rpm Surface -2,914' MD 8.6-9.4 6-20 35-80 <15 25-60 10- 11 Intermediate Mud Properties: LSND 8-3/4" Hole Section Depth Interval Density PV(cpYP ) (Ib/1 0ft2) API FL HTHP FL MBT pH 2,914' MD-5,410' MD 9.1 -9.3 - 10-15 18-25 <8 NA� <15 9-10 (TCM3) 5,410' MD-7,153' MD 9.3-10.4" 10-15 20-30 <8 NA <15 9-10 (THRZ) 7,153' MD-10,191' MD 10.4-11.0 10-15 20-30 <5 <10 <20 9-10 (TSGR) Production Mud Properties:Water Based Polymer Fluid (QuickDril) 6-1/8" Hole Section YP Depth Interval Density PV(cp) (Ib/1 0ft2) API FL HTHP FL ! MBT pH 10,191' MD-TD 8.5-9.0 ' <8 12-20 <12 NA ---III <4 8.5-9.5 Logging Program 12-1/4"Surface Sample Catchers-not required for surface hole Drilling: Dir/GR Open Hole: None Cased Hole: None 8-3/4"Intermediate Sample Catchers-as required by Geology Drilling: Dir/GR/GRAB/RES Open Hole: None Cased Hole: None 6-1/8"Production Sample Catchers-as required by Geology Drilling: Dir/GR/RES/NEU/DEN • Open Hole: None Cased Hole: None V-08 PTD 4 9/7/2016 I • Cement Program Lead Open hole volume+350%excess in permafrost and 40%excess below permafrost Basis Lead TOC Target surface Tail Open hole volume+40%excess+80 ft shoe track Tail TOC 500 ft MD above casing shoe Spacer -100 bbls of Viscosified Spacer weighted to-10.0 ppg (Mud Push II) Total Cement Lead 407.1 bbls, 2286 cult, 1197 sks of 11.0 ppg DeepCRETE,Yield: 1.91 cuft/sk Volume Tail 45.1 bbls,253 cuft, 219 sks 15.8 lb/gal Class G-1.16 cuft/sk Temp BHST 69° F Lead Open hole volume+40%excess Basis Lead TOC Target 500 ft MD from surface casing shoe Tail Open hole volume+40%excess+80 ft shoe track Tail TOC 500 ft MD above casing shoe Spacer -30 bbls of Viscosified Spacer weighted to-11.0 ppg (Mud Push II) Total Cement Lead 245.5 bbls, 1378 cult, 793 sks of 11.5 ppg LiteCRETE,Yield: 1.74 cuft/sk Volume Tail 21.8 bbls,267 cuft, 106 sks 15.8 lb/gal Class G-1.16 cuft/sk Temp BHST 231° F h# 5 Lead N/A Basis Lead TOC N/A Tail Open hole volume+40%excess+80 ft shoe track+ 150' liner lap+200' DP x 7"annulus Tail TOC TOL Spacer -30 bbls of Viscosified Spacer weighted to-11.0 ppg (Mud Push II) Total Cement Lead N/A Volume Tail 99.6 bbls, 559 cult, 482 sks 15.8 lb/gal Class G-1.16 cuft/sk Temp BHST 235° F Surface and Anti-Collision Issues Surface Close Proximity: No wells will be affected by the Parker 272 rig shadow. Sub-Surface Pressure Management: Jurassic/Cretaceous: Check pressure estimates and verify that injection rates have not changed prior to spud in the closest injection wells. The closest injection wells are V-104 and V-105. Schrader Interval: Shut-in V-202 and V-222 while drilling the intermediate section. Kuparuk Interval: Shut-in V-104 while drilling the intermediate section. . Anti-Collision: None. All offset wells pass BP Anti-collision Scan Criteria. Two wells fail major risk and have been minor risked 1 in 200. WKUPST-01 has been abandoned via cement and collision with this well would not present an HSSE risk. V-201 has been P&A'd with a cement plug to 4,500' MD and collision with this well would not present an HSSE risk. Offset well ownership information All offset wells identified within 200 ft of the proposed wellbore are operated by BP. • V-08 PTD 5 9/7/2016 0 0 Hydrogen Sulfide , V-Pad is considered an H2S site. Recent H2S data from the pad is as follows: Well Name H2S Level = Date of Reading #1 Closest SHL Well H2S Level V-01 58 ppm 2/15/12 #2 Closest SHL Well H2S Level V-205 20 ppm 6/17/15 #1 Closest BHL Well H2S Level V-02 22 ppm 1/10/15 #2 Closest BHL Well H2S Level V-04 18 ppm 1/4/15 #3 Closest BHL Well H2S Level V-07 18 ppm 1/16/15 #4 Closest BHL Well H2S Level V-05 30 ppm 10/26/09 Max Recorded H2S on Pad/Facility V-103 170 ppm 1/22/15 Faults Formation Where MD TVDss Throw Direction Uncertainty Lost Circ Fault Encountered Intersect Intersect and Magnitude Potential UG1 4,285 3,751 40' DTSW 200'SW/100' NE Low KUP 8,087 6,822 40' DTSW 175'SW/75' NE Low MLV 8,829 7,471 90' DTN 275'S/300' N Low SAG NA 8658 60' DTE 225'W/225' E NA SAG NA 8658 45' DTN +/-100' N/S NA 4B NA 8880 150' DTN 125'S/300' N NA 4B 12,579 8,871 30' DTW 120'W/100' E High • 4B 13,472 8,896 45' DTW 200'W/125' E High • 4B NA 8,850 40' DTW 150'W/100' E High 4B NA 8,850 170' DTW 250'W/75'E NA Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal. Contact the GPB Environmental Advisors (659-5893)for guidance. V-08 PTD 6 9/7/2016 • s Well Control The 12-1/4" surface hole will be drilled with a diverter (see attached diverter layout). The 8-3/4" intermediate hole and 6-1/8" production hole will be drilled with well control equipment consisting of 5,000 psi working pressure rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP test frequency for V-08 will be 14 days with function test every 7 days. Except in the event of a significant operational issue that may affect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. 8-3/4" Intermediate Interval Maximum anticipated BHP 3,537 psi at the TSGR at 8,654'TVDss(7.86 ppg EMW) Maximum surface pressure 2,672 psi at the TSGR (0.10 psi/ft gas gradient to surface) 25 bbls with 13.1 ppg frac gradient. Kick tolerance Assumes 7.9 ppg pore pressure in the SGR+ 0.5 ppg kick intensity and 10.6 ppg MW. Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 3,500 psi/250 psi Integrity Test—12-1/4" hole LOT after drilling 20'-50' of new hole 9-5/8" Casing Test 3,500 psi surface pressure 6-1/8" Production Interval Maximum anticipated BHP 3,541 psi in the TSAD at 8,845'TVDss(7.7 ppg EMW) - Maximum surface pressure 2,657 psi (0.10 psi/ft gas gradient to surface) Infinite with >8.9 ppg frac gradient. Kick tolerance Assumes a 7.7 ppg max pore pressure in the TSAD + 0.5 ppg kick intensity and 8.5 ppg MW. Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 3,500 psi/250 psi Integrity Test—6-1/8" hole FIT after drilling 20'-50' of new hole 4-1/2" Liner Top Packer 3,500 psi surface pressure Planned completion fluids 8.5 ppg seawater/6.8ppg diesel Variance Requests 1. To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line (<1000 ft). This is a variance from 20 AAC 25.033. Procedures/Safeguards with paddle removed: • Fluid levels will be monitored in the pits for both gains and losses while drilling. Alarms will be set to indicate if gain or loss of more than 10 bbls has occurred. • The well will be monitored for flow when the pumps are off at each connection. • The planned 8.6—9.4 ppg fluid will provide over balance to formation fluid. V-08 PTD 7 9/7/2016 • Drill and Complete Operations Summary Current Condition and Well History 1. Install and survey 20"conductor and cellar box. 2. Weld on landing ring. 3. Level pad and prepare location. 4. Confirm cretaceous injection pressures. 5. Validate injection/production in area per SOR. Rig Operations 1. MIRU Parker 272: a. Survey conductor with rig over it to ensure rig is centered over the hole. b. RU diverter system and test. Notify AOGCC 24 hours in advance of test. 2. Drill 12-1/4" Surface Hole Section: a. Take on 8.6 ppg MaxDril-N. b. Make-up 12-1/4"directional drilling assembly with MWD/GR/UBHO tool string. c. Clean out 20"conductor, spud well and drill enough to bury BHA#2. d. Pick up BHA #2 and directionally drill surface hole to the base of the permafrost. (Gyro until clean MWD surveys). e. Drill ahead per directional plan. Ensure minimum mud weight is increased to 9.3 ppg at least 200' before reaching the base of the permafrost. f. At the base of the permafrost circulate hole clean and condition mud as required. g. Perform wiper trip to the top of the HWDP. h. Drill remainder of surface hole to planned casing point at the base of the SV1. i. Circulate hole clean and condition mud as required. j. Perform wiper trip to base of permafrost. k. Trip back to TD, circulate hole clean and condition mud for running 9-5/8" casing. I. POOH and LD BHA. 3. Run&Cement 9-5/8" Surface Casing:- a. asing:-a. Run 9-5/8", 40 ppf, L-80, HYD563 surface casing and torque turn each connection. b. Cement with 15.8 ppg Class G tail cement and non-freezing cement to surface. c. Pressure test casing to 3,500 psi for 30 minutes on plug bump. d. RD cementing equipment and flush and RD diverter system. e. NU FMC 13-5/8" 5M New Standard Big Bore wellhead system and test as required. f. NU and pressure test 13-5/8" 5M BOPE. (Configured from top to bottom: 13-5/8" annular preventer, 2-7/8" x 5" VBRs in the upper cavity, blind/shear rams, mud cross and 2-7/8" x 5" VBRs in the lower cavity). ➢ Test rams to 250 psi/3,500 psi with 4"test joints. ➢ Test annular to 250 psi/3,500 psi with 4"test joint. 4. Drill 8-3/4" Intermediate Hole Section: a. MU 8-3/4"drilling assembly with MWD/GR/RES tool string. b. RIH and tag float collar or TOC. Drill out all but 10 ft of shoe track and then displace to 9.4 ppg LSND mud. Drill out remainder of shoe track. V-08 PTD 8 9/7/2016 i • c. Drill at least 20' but no more than 50'of new formation and CBU. d. Pull inside casing and perform LOT. - 1 3. / --, e. Drill ahead per directional plan. Ensure mud weight is increased to a minimum of 10.0 ppg before the CM2. Mud weight should be 10.6 ppg prior to drilling the shales. f. Continue drilling to the 7" intermediate casing point which is at TSAG. CBU as needed for cutting samples to properly identify TSAG. g. At casing point, circulate hole clean and condition mud as needed. h. Perform wiper trip, bringing ghost reamer up to the previous casing shoe. i. Run back to bottom, circulate hole clean and condition mud for running 7"casing. j. POOH and LD BHA. If backreaming is necessary, trip back to TD and POOH on elevators for final trip out. 5. Run and Cement 7" Intermediate Casing: a. Change rams to 7" FBRs in upper cavity. Test to 250 psi/3,500 psi. b. Run 7", 26 ppf, L-80, VamTop HC Intermediate Casing. c. Stage pumps up and condition mud for cement job. Cement with 15.8 ppg Class G Tail and 11.5 ppg cement. d. Pressure test casing to 3,500 psi for 30 minutes on plug bump. e. Immediately following the casing pressure test, initiate injection down the OA by pumping 5 bbls of drilling fluid to ensure annulus remains open for freeze protection. Continue to pump 3 - 5 bbls of drilling fluid down the OA every hour until the lead cement reaches 500 psi compressive strength. f. Install casing pack-off and test per FMC representative's procedures/instructions. g. RD cementing equipment and flush stack. h. Change rams to 2-7/8"x 5"VBR in upper cavity. Test to 250 psi/3,500 psi. i. Freeze-protect the 9-5/8" x 7" annulus once the cement has reached 500 psi compressive strength. 6. Drill 6-1/8" Production Hole Section: a. Make-up 6-1/8" motor drilling assembly with MWD/GR/RES with insert bit. b. RIH and tag landing collar or TOC. Drill out all but 10 ft of shoe track and then displace to 8.6 ppg Flo-Pro SF fluid. Drill out remainder of the shoe track. c. Drill at least 20' but no more than 50' of new formation and CBU. d. Pull inside casing and perform the FIT. e. Drill ahead to end of build section. POOH to pick up RSS BHA f. Make-up 6-1/8" drilling assembly with MWD/GR/RES/DEN/NEU with PDC bit. g. Drill ahead to TD per directional plan and rig site geologist as bit performance allows. h. At casing point, circulate hole clean and condition the mud as needed. i. Perform wiper trip to the previous casing shoe. j. Run back to bottom, circulate hole clean and condition mud for running casing. k. POOH, LD excess 4" drill pipe and BHA. 7. Run and Cement 4-1/2" Production Liner: a. Run 4-1/2", 12.6 ppf, 13Cr-85, Vam HTTC production liner with 150 ft lap into the 7" casing shoe. b. Fully cement the liner to TOL with 15.8 ppg Class G Cement. c. Set liner top packer and displace well to clean seawater above the liner top. V-08 PTD 9 9/7/2016 • • d. Pressure test 7" casing x 4-1/2" liner to 3,500 psi for 30 minutes. e. POOH, LD liner running tool. 8. Perforate 4-1/2" Production Liner: a. Run in hole with of 2-3/4" Millennium 60 deg phasing, random orientation, 6 shots per foot as per perf memo. i. Contingency:Perforating may be done post-rig by BP's Klondike Work Platform. b. Pull out of hole and LD perf guns. 9. Run 4-1/2"Completion: a. RU and run a 4-1/2", 12.6 ppf, 13Cr-85, VamTop completion. Space out and land the tubing with the tubing tail inserted into the liner tie back sleeve. Run in lock down screws. b. Displace well to seawater completion fluid through the IA. c. Drop ball and rod to RHC plug. d. Test tubing to 250 psi for 5 minutes and then set production packer with 3,500 psi. e. Hold 3,500 psi for 30 minutes for tubing pressure test. f. Bleed tubing pressure down to 2,000 psi. g. Pressure test IA to 250 psi for 5 minutes /3,500 psi for 30 minutes. Bleed down tubing to 0 psi and shear DCK shear valve. Pump both ways to confirm shear. h. Pump enough diesel freeze protect fluid into the IA to protect to 2,000 ft TVD on both tubing and IA. i. RU jumper line between tubing and IA to allow diesel to U-tube into tubing. 10. Nipple Down BOPE/Nipple Up Production Tree and Freeze Protect: a. Install TWC and test. Nipple down BOPE. b. N/U the tubing head adapter flange and dry hole tree. c. Test tubing head adapter flange and tree to 250 psi for 5 minutes/5,000 psi d. Install VR plugs in the annulus valves as needed and secure the well. Ensure that both IA and OA are protected by two barriers. 11. Release Rig: I.Rig down and move off location. Post-Rig Operations 1. Change out from dry hole tree to 5,000 psi tree. 2. DSM Pull TWC. 3. MIRU slick line. Pull ball and rod/RHC plug from landing nipple below production packer. a. If the well was not perforated as part of the rig operations, the well will be perforated post-rig using BP's Klondike Work Platform. 4. Install GLVs. 5. ASRC Flow Back. 6. Install the well house, instrumentation, s-riser. V-08 PTD 10 9/7/2016 • • V-08 Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control/Reservoir Pressures A. Surface Hole: Normal PP expected to the top of the SV1. The most likely PP in the SV1 is 9.0ppg (planned surface hole TD). Hydrates could be encountered starting in the SV5 starting at 1543'TVDss. B. Intermediate Hole: SV1 and UG4 PP's are expected to be 9.0ppg. The PP is expected to be 9.4 ppg in the CM2. The lvishak is expected to be at a 7.8 ppg EMW. Reservoir pressures will be controlled with the 10.4— 11.0 ppg mud needed to drill the HRZ, MLV, and KNG. C. Production Hole: The Ivishak is expected to be at a 7.8 ppg EMW. Reservoir pressures will be controlled by using 8.5—9.0 ppg water based mud. II. Lost Circulation/Breathing A. Surface hole: Lost circulation is considered a low probability." B. Intermediate Hole: There are three expected fault crossings in the intermediate hole. The risk of losses across each of these faults is low. Breathing has been known to occur in the Colville on other Drill Sites in Prudhoe Bay as a result of high ECD's. C. Production Hole: There are 2 expected fault crossings in the production hole. Past wells have experienced moderate lost circulation. Ill. Fault Locations Formation Where MD TVDss Throw Direction and Lost Circ Fault Encountered Intersect Intersect Magnitude Uncertainty Potential dips SW(40 ft), plan 200 ft lateral Fault 1 —UG1 4,285 3,751 crosses low to high &MD Low side dips SW(40ft), plan 175 ft lateral Fault 2—KUP 8,087 6,822 crosses low to high &MD Low side dips N (90 ft), plan 275 ft lateral Fault 3—MLV 8,829 7,471 crosses high side to &MD Low . low side dips W(30 ft), plan 120 ft lateral Fault 7-Zone 4 12,579 8,871 crosses high to low &MD High side dips W(45ft), plan 200 ft lateral Fault 8-Zone 4 13,472 8,896 crosses high side to &MD High low side IV. Integrity Testing Test Point Test Depth Test type EMW(lb/gal) 9-5/8" Shoe 20'-50'from the 9-5/8" shoe LOT 13.1 ppg 7" shoe 20'-50'from the 7"shoe FIT 8.9 ppg V-08 PTD 11 9/7/2016 • 0 V. Hydrogen Sulfide V-Pad is considered an H2S site. Recent H2S data from the pad is as follows: Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level V-01 58 ppm 2/15/12 #2 Closest SHL Well H2S Level V-205 20 ppm 6/17/15 #1 Closest BHL Well H2S Level V-02 22 ppm 1/10/15 #2 Closest BHL Well H2S Level V-04 18 ppm 1/4/15 #3 Closest BHL Well H2S Level V-07 18 ppm 1/16/15 #4 Closest BHL Well H2S Level V-05 30 ppm 10/26/09 Max Recorded H2S on Pad/Facility V-103 170 ppm 1/22/15 VI. Anti-Collision Issues > None. All offset wells pass BP Anti-collision Scan Criteria. . CONSULT THE V-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. 1t.68.K.MPPLL 1005 Cr®r n VSE Sr.DOLL 33•Or.MR SA.et=3,roe'Dm,or TM[ROMP 3o-vr SIC Ol&4W MLtr9E ill SAL 843 i ( 9H.MORE: Bono.W MOWN OOP ( -- - e•or OMR.Pr eeo . RA rGr FL.m0LL?(Orr O 22 r— - r.. 1r 3) w5R-0A51 Y f (,DO 7 5•.S16 a11.ET c f owa Loa 854 RAMS ' ' ANe11M1 aoP. r� 'R •=sl i' $ _NI 1rs/r 3.SAWS La .3-s/r i sNOofo TO ' =• , 13-SX su FUMED IMOD $4 BOP 31 ise. 53 Sir 3.ru. Er 1105E V COAL 8005 - Ji 13$R'sr r401 3'!03 r 061x1 cex MANN Is b/tl'SP IVKCJ eonoll E _ .>=. •ser eeo v.An wMs soar Bo1.rtn i ) e:Iwo..ocmot.taw.GAMY I J �e — ! 01111.1.1*53$1 cross J i 1111.2) 3$i'b rssz53$IC MI' / a sir$r mrao.oral .tzt s i/r w s�aE at1E3s ..E U[. - _ 2-1/1r 5.itEs Mk Ai 2-1/1r 3.f 3_1/r S.o.SA .3— 2-1/r f.RMB0 505854 4.4.w2 :II 3 5/3 sM n..1E®PrrB.eulc(A8C,MtK 1 $81505080. .. — .4 13 sT 3.1 FLOM o1 TR V SwOtE KIP I r t3 Sir S.RAM=TOP = . 3 Sir so fVM,1p=TOP .+ ___ rWPIE LP c i J 3 Sj SPOOL I . u sir w RNax TCP 13 3/r 511 nom=80110• acre M 3-1/r 5.fL o ..PM4 ON.1u[ �r� r,we sPmL ]-.ry•S,riAM•'9 wroPM.1C ON POSE 13 3/r 5.RACE 1! 3-vr w REs POSE Ls s/r w RACED!MOD C W ST•OK3 AO.P2! 13 S/r 54.RAM TOP 11.5.rtAYI30 MO x1• 13.11AO MQ Ku 4.4 aOPX.O.. f..SP.E SPoM MSE.S3 DEMON,Pa wertko4. 3.tr•met (48410>4C'PEroPP's 11•SY rum='OV Re.141.1, 11.5.Py1YR0 n2P01. CO%$48$SSEM110 11.564 supra 50. f'eFME311•L mo nie err•.r enls xi. 0.1. t ,1cmn.,, ..r;,v,x a r ..M.........._..._.Y_..M.:_ ^ I ' '.,s PMI E ITECIRIOLOBV.INC. ....1...Y►........rr...M.Y. _.._. ..__ ....._._- wsM..�1YY...17. i=ik. ^ ..Mwc 110.014 13 3/r S•80 _w 1...a..�.+..�..,.....A.NAM•••••••••••l M1Y. A I 35 TX%-UY tArAR iSM..YC Yf..r YII.Y. V , e ..,..- V-08 PTD 12 9/7/2016 TREE= VVELLHEAD= • V-0 8 sAfor NOTES: WELL ANGLE>70°@ '*** ACTt1ATOR= -_ MAX DOGLEG: °@ '****4-112"CHROME _._ __ PROPOSAL TBG&LNR*** OKB.ELEv= ,, BF.ELEV=ffi -- — ii' KOP= 4' Max Angie= _`@ ' Datum )-= % -2,200 4-112"HES X NP,D=3.813" !� 4Datum TV D= __._ 8800'SS 20"X 30"CONDUCTOR,133#,X-56, -120' D=18.750" GAS LFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 9-5/8"CSG,40#,L-80 HYD 563,D=8.835" H -2,914' 4 3 Minimum ID =3.725" c@ ' 2 4-1/2" HES XN NIPPLE ESTIMATED TOP OF CB/ENT(XX/XX/15) -3,414' kli 01 tot, a ro$ e ...„,, 4-,--ii! iii ^9,936' H4-1/2"HES X NP,D=3.813" C'1i w blib rifiFes, F=, f -9,966' H 7"X 4-1/2"HES TNT PKR,D=3.865" ,�i V NI ► -9,996' 4-1/2"HES X NP,D=3.813" in; 0 24 -10,026' -14-1/2"FES XN NP,D=3125" ..,,,......, 4-1/2'TBG,12.6#,13CR-85 VAM TOP, H -10,036' "SC tip. G -10,031' H7"X 5"BKR TIEBACK SLV,ID= " _i .0152 bpf,D=3.958" -10,041' 7"X 5"BKR HRD-E ZXP LTP,ID=5.250" 'ail I TOP OF 4-1/2"LNR -i -10,041' lb,14 40A4it! Me -10,036' —14-1/2"WLEG,ID=3.958- OeV 7'CSG,26#,L-80 VAM TOP HC, -10,191de ,t' .0383 bpf,D=6.276' I* 04 PERFORATION SUMti4ARY 441 if. F2EL LOG: ON XX/XX/XX ;p ,k4 it ANGLE ATTOP PERF: "@ ' Note:Refer to Ptoduction DB for historical perf data SIZE SPF H 1TERVAL Opn/Sqz SHOT SQZ CV Fli A, PBTD -13,978' 64 r�e��• l fed 010 4-1/2"LNR,12.6#,13CR-80 HYD 563, H -14,067 ' t�' 1,0,4,4.1.1 .0152 bpf,ID=1958" DATE REV BY COMMENTS DATE REV BY COMMENTS PRLUHOE BAY MIT 12/07/15 JCL BOLD PROPOSAL WELL: V-08 PERMFf No: AR No: 50-029- -00 SEC ,T N,R E, 'FSL& 'RC BP Exploration(Alaska) • • • mW �_ Mia 0 Q= m a. m i I o Q 0 co OC J C) Q I = co CO L0 3 = mco o '� o0 00 o N twmoo s .°c a > L -a > c c E a a Z a` aaa a m la 0 • • III iA zi all W= Z Zcr) CO Moc ^ 3 � o Ilium D m djN • O OO oCO W in O 0. c c o� 6, ▪ a g`, m m a a a U 0 01 el Z Q N N as o c o fn , O d u 3 7 0_ N CD rn d m cc To O O 7 Y N U O O (0 a, Ili N O W 0 ZT > D U 0_3 O1 c c c Y (o l9 N (n > a o-cL ai - — co co N . 2 C o) o) N z J N O D ` Cl0_ • f) t% u -0 Y 2 I y J▪ J 0 N > N 7 O - a- U Un �= c ai ° 's o to I.) c a .0 o c o J J u' L i j y 8) a, 2 c C d F d O ,7) c c ei u m E 'a a u U w , m Ow c a w m O N m o w d m U w E .. = 3 .S \ Sorn N- U dre > a :t 0) o o S. O .c CD V G 't r u) V o O yN N cO N o O GJ 2 VO LO 0 c0 ✓ o 0 v o N ‘.- u-)i of m Cr coel m y coo N 0) LO c i LO. a d = a Ca c L o. m o Ct- c p 3 .. O C . O O NW▪ 7 O H 7 os co> CO i CO C O7 {Dp W W C t c 6 N Z W b) L C L A O A To .2 r-. z W u y F o ) 2 N6 + a O Z co r o Q N N m , to o r W O ), d : = c O. w o Oc D 3 E La ox 2 O C6 1--5 !,_ N a, L _ V ZD = J = m 0 > O ,_ N > N O O O 0LLJ U O O O O UNN Z H Oo O co U) 0 o O N dN O O o>Q € C Q O >l6 Z 0 co rO E ? C in N (ou Co O U > N N N d O. d a C > co rn (o Em -O co co to 2 N E N 0(o O O Y € II > C C co o Z Q ? W ` 9 99 z a co a a > c c 0 E 4 ° co a p c o c iri u , E m u) d N >:. .. 0 3 CN C •a C U O f/) tV OE. a u o c u ( o n°i ° o a° o o ..... c ? o m co y a m y a a_ c rn u o ° .d. m m y •o w m m 07 0 o m w p d m ayi ZS Ua m33o a` � c7 � in ma` a 3 3 a 3 2 0 ¢ > > • • to 0 0 0 0 O 0 0 0 O O O W o 0 0 0 0 0 0 0 0 0 o a O N N No O O O O O O N N N N 3 CO CO CO CO m Mille0 o O I— MOh 0) C C O O O O 0 0 0 O O O 0 CO d O O 0 0 0 O O 0 0 0 0 d d oO O O O ,- ,- ,- ,- N N N 0 Z E N-N. < n N N CL 11a J 0 = = 0 0 o U). N d O) O O O O 3 .. O O (O W Op (0 co OD co co I0 co (O 0 0 (O N. O Z Q CO O (D (O CO N CO 0 0 ( CID (D > ©© 3 O O O O O) to co co N �D c U Di Di Di of ao ao (o V Di ri V c c c Y O CO O 0 co co U) CD LD LD V (6 l0 l6 E LD O) (D CO (D (0 O (D O CO (D co co a n 3 c E 0 0 0 0 d 0 0 0 0 0 0 - m co co ,E 2 -y a 0) D) Cs) CO a, a, 0) 0) 0) m rn go .2. N (n LD Cr) N N LD N N LD Ln • > > 2 a w LD u7 Ln Ln O D) M N� V (O CO V V "Cl" V U)) a- a- (D 0 a- 0 Ci N- IN N.: ri ti 00 0 0 CO r CO u •i 0) M M co CO CO CO V V LD (D CSo = 0) a) o) m rn rn rn rn 0) rn 0 L N N N N L = O) m O) O) O) O) O] O) O) W W w d N N N W . j O (D (D O O O (D CO O (D O m a) CO 03rn rn rn CD CO rn CO °/ 2 2 2 2 2 ° n D c r f n n D ri D ri Z c 0 0 U 0 Z R 6 •- Y O_ D _O � O O_ C Cl d c - > C C 'O c u N O L > N C C 0 O 0 O O 7 LD co co co M .-- 1.?) D/ ''al O co O ~ O O O O O O O LD � co (D O O O O O O N V oi u) V U d w V N N N YO c° 1-u- 0 C Y6 N �' N t N co c c U) c _ _ u >• - O 7 co OI c 3 c > > -- N J 2 VJ O c Y E g Y v o W 7 U + + 0 + + '06 + '00 + 0 C N m CC N N CC N N 2 N 2' a) _ ,N � - U) - CO - G 3 ' + EO , + 20000E r + ) + O 0 0 0 M 0) N 0) CO N D) > u 000 c ❑ ❑ > O O O O 7 (D N. (O co co v N ]. U U > o O O O O o N O O o ate, u) x La , 'z 2 m < < < < a 0 0 0 0 0 O 0 0 (n O cn 0O O 0 O O 0) 0 a- N M 0_ co 2 a T. ❑ 2 2 v o Di Di ()i ci of 0 0 au Ln CD CD V 0) CO 0) 0) O] D7 v CO ❑ w W 1,1 d'LL y N N CO V lD co 0 Z >Q + 1- + 1- + T O N caa -1- 00 + 0000 LD O O O LD O) (O 0 a- (D CO 0) 0 O O O) co W co co o O O O O O N O) O) O) O) O) W ✓ O O O V co CO 0) D) O) O) N CO CO CO V LD (D I� O O OD OD OD OO OD m o CO 00 00 OD O O 0 0 Oo 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 O O O O O O O 5 5 5555 5 » 5 O N N N N N N N N N N C C C C c c C C C C C L N N N N N N N N N N co O O O O CO O CO CO CO CO ..... M M co co co co co co co co .00 d d 0- d a O_ D_ D_ a d d E m a -0 .0 .0 .0 .0 .0 .0 .0 .D0 Pi m co O) W O) 01 0] O) O) O) O) O) W E. Tio O O O o O o o O o 0 a n n n n n n d a n n N 4 3 3 3 3 3 3 3 3 3 3 3 a ,p_. OD CO CO OD 0 COo CO 0 M = 00000000000 0 0 O 0 0 0 0 O O O 0 Cl, > > > > > > > > > > > 0 0 0 o v 0 0 0 0 0 0 Q y O CJ C. 0 0 0 0 0 0 0 0) O O C] O O - N co LD I� O) O O O O O 0 0 0 0 0 CO N 0 0 0 0 0 0 0 0 0 0 0 V u . O o 0 0 CD v 0 0 CO (D u m .2 m a O y o CO D) o 0 CO 1- (D O c C vi E -O W OD CD F 7 N N N CO V' O O a- a- N V N LU O O n O o a > > 3 F L L c c co O O O 2 co 0 0 0 E O Oco r. Z d d O d > ` Ln 0 0 0 0 0 0 0 C. 0 0 00000000000 LD O 0 0 .0 N O 0 0 (Ni 0 O O N co 6 0 0 0 0 0 0 0 0 0 6 a) o 0 o a) o 0 0 -00 O o to `2 7 O O (O CO D) V V LD LD T (D O O O j N O O 6 Q. O. O O O) O O co co W V o O O m V O 0 0 m 0 O O co O- a N N N CO CO- O O O a- a- N CO M V' LD co I� co O) . N S1 G O co N p S CO m N 0 C .. i 1- u_ a M ` W 0 q1 N O c T C p a y a m c E Mi - c o O o w m d m C.) a u) 0 m a C 0 • 11111 .--V V V COu)M co co a0 0 O 0 0 O 0 0 O 0 0 O O _._ 0 C) CO W CO 0) an N O O 0 0 O 0 0 CD 0 0 O O O O a ,.�� u) V V M N N N O O O O O O O O O O O O O O '� , ... d Ca M. . oo , i/ �- O u) 0 cn uu) u ) ) u) u) u) u) O O O O O O O O O O O O O O a C m a r` N r` N- N. r-- r` 0 0 0 0 0 0 0 0 0 0 0 0 O O a s U N N N N N N N O O O O O O O O O O O O O O O z a U co co < N CV CV CL 0_ j p r 0 p o N N W 7 3 0 In an d CP O) a O O Oco O O a N o a O V s- co CO N- 0) CD N CO N M 0 V V V 0) N O Q W co co (O 00 V (O M (O r 0 0 O CO O (O CO(O u) > /.�)/,�) M V V N a0 O M N c- co u) O) O) N (O O 1- • an V O G G C� V M aO O W V O) CO (O N- an CO O1 an OD N N- UA a0 C C 0 Y co co ' O N- u) V N 0 0 N- N- V CO N C) CO V N CO a a a E an = CO CO CO CO In u) sr) u) V7 an d- o- V V V V co co co M M N d d d O O O O O O O O O O O O O O co- O O O O O co- - a0 co d E 2 .N 3 O) CO C) CA co C) C) (P (P (P C) CO 0) (P (P 0) CA (P (A (P O) N o o C p a u) N N an an Nan an N (n an an an an in u) u) F= w w " co M V O N r- c- V O) N V 0 M � CO 0 M CO 0 n) N M M CO an M N 4- r� O) O) 01 N V N CD C) M M an CO V C) r` (n CO O a0 V an co M V co N V N a 0 ai D) ri O N. Oi V C) ui a) r.: r n CO ui ui V ri a ' T co co co V N.. N- a) CV uCOO) c- V N- O N CO COC co co co O OO co O CV an N N N M M M Ma) co C cg A OCAi. O O O O O O O O O O O O O O O• O• O- O w rd 7 OO) N- CO^i co Dl C) Dr) WN- N- N- COCO N- CO CO al O^) N iz — an u1 an u) in an an u) an u) u] u) u) an u) 1.6 u) an• an• u) 6 dO it y . C V W C N 'O C U d CO O O V an CA O N- N N r-- 0 � au M N O V O (O O N C U V CD (O u) u) N an O u) N u) O • O M N fA CO O 4 d w N V u) Oi r aD N lD O O u) a0 r N- f0 C') O O N O O an O w « d U a M co V (O OD co CO co a0 W N V C) N M V N U d It a CO N N N N N M M M M L d . - 0 >G Cr C Z J a z m O W - O a a) N u) V N O N M N CO (O N N- (D CO 0 an N CO V T V a) co .a- N O 4- N N- CO V 0 CO I"- M 0 CO co N O) a.3M V N M N: V au M O M C7 N N N N .- n r O ` V V co a0 O M V CD CO O) N N an CD N V N- a0 0 M N- s- N N N N N M M M M V V 03 C z —. a m O a1 r) CD M CO M M 0 V1 0 00O 0 M u) O 0 N u) O V O O CO CP N CO O (O O V M O O N- (O O V N ci an 'a(D an N O) M (O N- a) an O M r M W 0) co a0 N. C) O V O V V CO') N (NO 0 0) d m y co co COO .- NN M V V u) u) (O (O N- co D) O 0 CD In .t' r r .- .- .- .- ,- '- .- N N N- N 4 O 7 Cn V N 00 00 00 an 0 u) M u) an CO 0 M an an N- O C) V CO O N C) 4- n m CO 0) V N a) O O) N- an C) CO N (O CO M O V N- O O u) s- M ri ui V r- m O N N V ai CO co CD C) CO N- CD CO V CD V u) V N- M N N CO O C) C) O) O N M M V N N _CD (D N- N- CO C) O N N O Er r r r r ,- ,- '- -- N N N• N- N- 2 N. N- V N. an M N- N- n r- N- r- N- IN N. N. N- r� r� r- N- N CO CD N CO u) V V V V V V V V V V V V V V V O O ai O) 5 aD CO CO O CO m CO a0 CO CO 5 CO CO CO O CO L N N 4- r - c- . . . . . M M co M M M co M co co M M M M M M M co M M co E .-. N .2... 0_ .a mN a upa r- V co co co N M a M M M M co M M co M M CO M M CO V V N C) I,- M M M M co M M M M M M M M M M Q V N- C) N M M M M M M M M M M M M M M M N N N N N N N N N N N N N N N N N a N U• co L Le a C o ) 0 O o N Q o a o o a v r > > 3 .t U c C co L O 2 co a a O N z !L CL a a > O 0 0 0 0 M 'Q O O O CO 0 COaO O 0 0 0 0 0) 0 C) O O O O O O CO 0 O) O CD 0 0 M 0 0 0 0 CO 0 0 Ow O O O O O O N is O N O C) O O N O O O O V O O 0. Q ` C) 00 O N M OV NV r (O N O a) O O M O O O O u7 O co 7 (O (D N- O CO a) O .- N N M V O O �^,� CD 4- c- 4- 4- 4- c- t c- U c- c- u7 c r V N N N N• Ch N N N 0 C d .. a a 7 N y W to N y N R a ' a s a d E .o :' d d d m a U a m 3 3 o a C M I • • y O O N N CO m O O m m m O O O O O O O O CO O O a a N M co co N N N O O O O O O O O a O O O O O O O O O O O O O O O O O W; to CO m o MOM bg o sz cou) o o 0 o co o 0 co 0 0 0 0 0 o O o co 0 co 0 O. C C d O N O O Ln Ln v) u) Lco Ln Lo co O o 0 o O O O O O O. _ U o O N N N N N N N N N N6 O O O O O O O U co co Z E N. r < 0 N N N g a a J O 0 in O N N U 3 d rn 0) N( 0 O O 3 Y > O O 0 N co m co W N O N W Q) N- CD N W CO N- O V(OO <— a- LO Cr a) C) O N a) a- CO N CO CO a- m m N LO G » (7 O)r CON N N r 1f N V M N r M N O )f) O O N.: V CO T N.: 4 mOCO T O N M N- N- U) CO aD C C C N- co co M O m N- N. 01 0) CO co co LO N N N N N O O O O O O 00)) 00)) CO CO d O_ L1 7 C Cr O O O O O O O O Cl- O O O co- O O O m W O) C) — CO CO .E N c 0) a) co, a1 a) o) co rn a) CD CD 0) CD 0) m rn m CO CO CO to co Lo N co 6 co N Lo co Lo an co co L[) LO 6 co co N N O O ` C a W 3 > > N= Lw r LO LO CO LO CO N M N N r m W CO a CO CO 01 Ul N- .0 m O 00 Cr a1 CO N CO 0) N 0 N CO M 0 ) N CD O M r 7 m M a) 7 O LO O Ln d N N M M r V' a V- rn CO O CO N co 6 a a) M V .3 p) N- a) a) N LO CO a) a) CO CO r a) N a CO CO O LO a) Cr CO C CO_ M M V of )f) to LO LO CO CD CO m r r r m L ,C Oa)O O O O O O O co- O O O O O O O O O O O K m Z ` r N- a) r r r r r r r N- M r N- r r r r r r N- r 4) T W d) Q) Q7 O) 0) O) o a) a) W a) a) 0) a) to Lo L!') Lo Ln Lo 6 l() to Lo Lo N to LD Lo N N LD to LI) C . O C N V LR 'OCy m N N O a) O O LO LO M V. N CO O N CD a) N LO CO m a) co a) a) O N UN co O N- C LO m M Cl- r Cr r4 CU O NWCD COMo Vmo `al 0 W CO O LO W a) M CO N N C COm N CD VUN co a V' a V aV V' ANLn Ln m (O (D (O CO N N- N. il L N (6 N W j O 0> 0 0 7 7 J F r2 2 u) 0 t0 0 N CC M M a1 O M O a) O O m CD a CD m m O N V' T 7 7 LO m O O r N N O a) O m N V CO m a) 0) 0) M O O m O N C) M m If) r O m M In O (D O LO ` 7 co CD O) N N co CD O O a CD W co co m N r .- a V a a U1 LO LO LO CD CO CO CD CO N- N- r N- m CO O) CO C Z (7 a. 0 O CLO O r a) m co O NJ O O O) m O O O N- M O r CO O m O Q) O) O O a) m O m N O O M LO rm O a CO LO r r m Ti M M m O O m a-- r r N M CO m N- CO N to LO co LO N Cr O Cr r m CO R N O to CCI N N N CO a LID LO Lo m m r r CO CO CO CO 01 O a- N O CI) N N N N N N N N N N N N N N N N N M M M Q 0 N 2. N O N CO CO O LO CO )O Ln V M Lo )o LO Na) )o N CO co CD O 0) O) O a) m Lo a) CO O) a) co a co co a) M m m m r Ln CO 4 0) O O) N r r N N N N N co m co r m N LO N M LO N Cr O V r m CO V' N O M CO M Cr LO m m CO r N CO CO a) 0) 0) W O NCO O N N N N N N N N N N N N N N N N CO CO- M M 2 r N- N- M O M V LO CO m m CO CO CD CD CD CD V V' Cr CO r CO CO CO m m m CO CO CO m m CO CO CO CO m m m CO CO m CO m m CO m m m m m m m m m m L .- .- ,_ .- .- •-- 7 co co co co M co co co co a) co co co co co co co co co co E N C 0 i0 co •N a coco M r r r o v r r r J co co co m M O m CO M N- CO N. r r N. r N- r N- CO CO CO Ln m 6 O o M 6 6 (O m ro (O 6 (D 6 m (D (D Q N N N N N CO CO M M CO M CO g M CO CO M CO M M M M (6 M U T U N O CO C C .°... .,- ('1 co N co co O a CO 03 0 RI E N (0 O O < O O_ 3 Oat. OLL a = 'O C C m I- I- L O E on 2 2 o N N Z CL CL a a > LO N O O O r N V' O O CO O co N 0 co co O O O O O V y coN cococoO o O O a) O O O O O '- o O O O a a- a) J O O O N J dD O O (') O oD m 0 r V O O O O O a co C) a a) a O O O CO 0 a) C) O a- O M O LO O) O O O O O ` V V' LO CO N- N- N- a) a) a) - O O ,- ,- <- Q N co V LO CD N N N N N N N N N N N m M M r C CO- a (+J a [h CO- CO- CO- M O v) c Lu .. 9 ri 7 y N (% • • II O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a ,.�W o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 _= m `�� ma o v, O 0 0 0 0 0 0 0 0 0 0 . . 0 . . 0 0 o. . 0 . o O n a U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 06 0 o U Z E co co < ta 2 N 0 Q J o yr O p O- 0 7d u) N O co m 0) O O 3 Y CD O to = N N- O UO N N CO O Co CO N. 0) r 01 O co C) OO — O N U) O N O .- 0) N CO UV U) CffO 3 V O CO- CO - N 0) O LO M O N CO V co> ©p 0 W) D od ) O) 01 OO) CO OCo 0ONO oCOnC C C N- co 0co N- CO nO O (0 O > mmm E 0 cn co CO N- r- o CD m Cr)( Un uv v v v vv co co co ET_ O.D 3cK c x A aof C) OOai O) a) W CO- CO- oQW O_ O) QT OE .Na o CO CO OD CO aO ao ao ao co 03 0 m o CO CO ao CO CO mm CO , 7 a U) u) U) U) U) U) LO N U) UO 0 U) L[) LO N U) U) U) Ln U) > > L 1` 2 w w O co .- CO CD CO U) 0 CO U) O CO CO CO O U) CO O CO U) Ln LD CO N CO U) o CO n N. v CO Ln 0) 0 v N 0 .- CO N- N V CD CO CO LO 7 co (o a) N V N O CO U) CO m N N- CO C- O U) O) O] U iO c) N aO co N- N CO O LO C) N V U) COO CCO N CO CO I- N- CO C a) O 0) 0) O O O _ N N N N N CO CO CO CO CO -c 'L � O O O O w W U ^ N. ^ a) W O) 01 O 0) NN n N O) 0) O 0) N- N- O CO N- a) N. N- O O N- N- O 0) N- ce O N-a).Z N UU) U) uU] U) N N U) Ln U] U) U) U) U) U) U) U) 0 O C a E P.O u m g t, Ci) a 7 6) CO (O CO N N- U) CO 0 N' CO O (O O CO N O N Q C d d V U) I� O C O N. O O CO ai ai O (O CO O CoDi 0 f� CO () d 42 w 0 N ea GOLD CO N- CO m O co N-0 0 7 N CO LO CO CO N el 0 N N CO N • W _c d _11- 2Z00 O• I3 0 = fu w = 0 0 a) 'Cr N- 0) co N co N. 0) CO4 co U) a) N- N a) O o) a) O O O U) O O _ ap co N (D O U) (D N O O N r o0 r (D M .- • • aO .- (O N CO O U) 0) V- N- CO CO N O N N CO CO O CO Ln U) O) a) OO O N N M M M CO CO V V Q m c Z _ m CL (u O O C CO O (O O N 0) U) O N O O fa O N CD O O N M U) (D O O O M O U) O O (D O O O O O CL O N N N N N O CO CO CO U) CO (O (0 CO O CO N U) N O co V N O U) a) co V O N CO O O N- W CO U) co a) m N N M V N CO (O CD N- Cb CO 0) O co O O O ,- .- co cn N = CO M M M M M M CO co- co- co- co- CO CO sr- V' V Q' V C Q O 7 U) N ,- 0 V ,- U) N- V CD U7 N- U) U) CO U) O U) U) CO O co V CO CO CO 0) M O) V 0) a) (O O) co a) O O O M M M M M O CO 7 V U) V CO (O V O V N U) V N 03 CD V N O U) 07 CO R 0) N CO 0) O N- CO CO U) CO Co CO V UO (O r N N- CO CO CO 0 0 0 N N N 0 M M M M M M M M M M M V 7 V V V R V V V I- 7 CD CO CO CO CD (O CO CO CO CO CO CD CO CO CO CO CO (O CO CO CO CO CO CO CO m CO CO CO CO CO CO CO aO CO O CO CO 03 CO 0) CO (O a0 a0 W 00 a0 aO 0 0 M CO O a0 aO 0 a0 0 od L CO CO C co co co co COM co co CO M co co CO M CO CO CO M CO CO CO CO CO CO E .-. N °... a =° co •N N. N � N- N N- N. N- NN N. N- N. N- N. NN. N. N. N O CO O CO O CO CO O CO CO CO 0 CO CO O CO CO O CO OQ co co co co co co co co co co co co co co co co co co co co CO U N 17 V C m a CO CO 0 • a) a) O o a -e 13-C LO > c C0 O 2 m a, m 9 z a a a a > N 0 o O O O V CD O O Co O C\ N O Co C) N. CO 0 v o 0 0 0 0 0 0 0 0 v 0 U) v o n o 0 N- o a T N C) O O O O CJ O o O V O U) O N p N6 O a) O co a) N o O O O O N- O O O CO CO O .- .0 CO d 0- 0 N ao CO O N CO v v M 0 Ln 2 LO a CDD 0 2 r` CO C CO -0 7 0 c CO-- el o) CO CO- v v v v v v v I v - I v 1 0t v I v v v V N C7 C7 C7 (9 (7 a 07 C .. — o '2 �. 7 7 7 7 Z Z0 N ma a a) c co COo 04 • • o 0 0 0 a o 0 a o 0 D CD W o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 u0 � IL co 0) 0 0 00 O O O 0 O O O O0 O O O O O O Q CC 4. O O O O O O O O O O O O O O O O O O O O_ O d U O O O O O O O O O O O O O O O O O O O U co co Z< ti N N O dd 0 J O 0 0 o N NcK 3 = d Ln Ln ) O) 0) o O O O y 0 0 LO N pO to N- co N m V N 0) 0) M 0 CD 0 CO V O Q co co O) O) ,- N 0 O 0 1n Ln O) I. N Ln CD CO W (N N CD a) In O O CD co (NU) M I. V co CD I- IN m O V 0 . m M O m rn O Q) .- O 4 O N O O m O C C CY m m V CO 0 N- co CD co N CO CD V CO 0 m N Lo Lo to E Ln • M co co co M co N N N N N N r- r- •- O 0 a n a CC3 _ 0)o co 0)co of of00 co ofco co co of o) rnco of ofco 00 of o) 000 co ) of CO of of m of COCO CO CO 03 CO m N . 0CO CO 2 N 3 in In N in Ln Ln in in N Ln LO N N Ln Ln 4) Ln Ln LA 1 2 �w W O) co N CO CO 0 V 0 I- Ln Ln 0 N 0 0 M N V N 0 CO Ln V 0 V O CO V N- 0) N- Ln CO m N CD O O) 113 CO N N CO (DN m N- V N m N- CO CO N CO m N m O I- O OO m V O N Ln CO W4 m L) .ei p) co O) N N Ln CD 0) ' V Ln CD 0 N V V CO CO N- C C O C M CO V V V V V Ln LOLn N Ln CO_ CO CD CD CD N- N at r C 7 77 N- N = ti n 0) 0) r N- N- 01 n N- N. 0) 0N.) r N-0) n N- N- CO 0) N- n Z T O) O O O lA O) U) O lD O) O) O) W T O) W O) O) co"ce Ln co- co- co- I1') Ll') LA co- co- Ln Ln to In L)) N Ln co. co - c li d 2. � C yu U u O C 7 m 0 Ln 0 co co N N- N- V CO N- CO CO N N Ln m C V L) 0) V O V V M co O) N- W O co M Ln m m O M CD Oi w LQ V m r V Ln O O m O) V W m m N- N- N- co Ln O w a) O N co co - M Ln N CO CO N M m CO 0 ,- V m N O dTy IXT CO N N CO co M CO M M M V V V V Ln Ln co Ln CD L d d _ (Zj > 0 t t r N i r i i r i i i i i i r r r r i J F 2 2 = O W 7 r 0 0_ (I) Ce V N- V O) M N 0 Ln CO I� IN 0) CO 0 M Ln N- T M N N O 7 N CD V N .- N CO N N M co M co M Ln r N lT m O) O - O m V .- M m O m 3.. N N- O O N V 0 O) W N CO V CO 0 N CO I. t- m V Ln Ln Ll) N to Ln Ln CO m m m I- N- N- N- CO CO CL My r m c Z o m Ci_ (1) O 0 m 0 O V 0 0 0 r 0 V 0 0 0 N CO O O 0 O 0 M O 0 N O m O m O O O .- co co m4 V V CO CO V m V O V V to M In N Ln D) O) V co O1 N CD 0 o Ln co O CD 0 V N N O CO 7 N N N M CO V V V sr co N m m CO N m CO CO N NC < V V 4 V V V V V V V a V a 0 in Ln N M Ln Ln O) in N LO Ln N Ln CO Ln co Ln N m Ln W O) O O) N W W V O) m O) I- O) W O) N V m Ln V Ln CO M Ln m N O Ln V N M CO m m co O) V co O> N m 0 O Ln CO 0 CD 0 V Ln N 0 CO N N CO (.1 M V V co co co co CO CD IN N- N CO CO 0) O E v v V CIV v v V NICIv v v v V v V V V 2 co co m CD m CO m CD m CD CD CD m m m m CD CD CD CO CO CO CO m co co co co co co co m m co co co co co m m m m m m m m m m m co m m m m m m m L = co co co co co co co co co co co co co co co co co co co E N °_ 0 m Ti a g N N. N. N- N N. N- N- N- N N- N- N. N- N- N N Q (D LD (D LO CO co LD LD lD LD LD CO LD co LD LD LD LD (D co co co co co co co M co co co co co co co co co co M co u C.00 -o co CO mC o N co O O O. = D > C C CO O 2 m 2 O Oi Z W d W a > N- O O Lf) 0 N- N 0 CO O N O Ln 0 m W 0 0 0 CD V O Ln 7 O W 7 0 N O .- O CO 0 O) (/) 0 0 0 Q M N O m m T m O N O O V O O O O) < O O oo y co V CD 0 co O co O) O (0 O O V 0 0 M 0 0 0 Q ` CO m 0) 0) O) O O 0 - N N M CO V V 1 Ln CO N. N NV V V V V Ln Ln Q co- CO co- co- 0 co- co- O co- co- LL Ln Ln LL Ln Ln Ln N c .. .. 10 22 =. Z Z Z 0 0 0 0 0 0 0 `" O. V O C C co E " m c o • • . y - 0 O 0 O 0 O 0 O 0..... CD O 0O O 0....0 O O0__--- 0 0 0__. 0 (0 ill o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O o a al no 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W.�� CD u ,_ a7 o p u) 0 C C O O O O O O O O O O O O O O 00000 O O O O CO CO d O 000 00000 00 O O O O O O O O O O O O O.2 U O O O O O O O O O O O O O O O O O o O O O O O 0 Z g r n < 2 N d N co J o 0 r O 0 o O )C) Q D = D U1 U) a) 0) 0) m O O = Y O o (a n _ CO N W 0) 0) (0 0) O CO CD CD 0 in O — CO C0)N N (0 0) CO 0 0 CO (0D 0) 0) ( 0 CO 0 0 CO M (^O CO 0 ©@ 3 O N V LO (O N O) O N M W V (O I� COW O ri CO O) Nt LO V G U pp N N N V N N N N M c') C') CD C') C') N- C') CC C Y co co O CD N 0 d' 0 0 d' N CO d' 0 0 N CO CO d' 0 N- CD (O N lQ E N 0 W O) 0) 0) CO CO (- N- N- (0 CO (D U) U) U) d' d' CO CO CO CO N N d d d C C co- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OD- _ 03 03 E a a) co 0 00 co co 0 co co co co co m co ao 0 co co co 0 co m 0 co N O O 3 c N 3 U) N U) U) N U) U) N U) U) U) U) U) V) U) U) U) U) U) U) N U) U) H 2 W w O) a) N- d' a- 0) (O d' a- 0) M CD CO a- CO (D CO s- CO CO U) N- M 0 0) M N- (- d' co N CO 0) U) CO N- co M 0 d' 0 U) 0 (D 0 N N CO CCO CO0W CD N- 0 CO N O a) 0 M N. � N- 0 O U) W6 d' 0 M .- ci O la 0) N CD U) 0 d' a) co N- a) N 0 N 0 d' 0) N (N') CO O N d O C CO CO CO a) O) O O O a- .- a- N N CO M d' d' d' U) U) U) (D co .0 .E .- •' N N N N N N N N N N N N N N N N N N w a) t+ .ON.. n n N- N- N- N- N- N- N- N- n N- N- N- n N- r e-- N- N- N- N- n Q) O) O) 0) 07 O) a) 0) O) 0) O) O) O) W 0) a) 0) O) O) 01 0) 0) O) Z Z U) co" U) U) Ui U) U) Ui Ui Cn Ui U) U) U) N 6 U) U) U) V7 U) Uj Ui • o is d " 0 V 0 C 10 'O C V a) 7 ." d' N- 0 N U) 0 .- d' N N- CD M U) CO rN- 0 CD a) C U M O M 0 O M CO W M 0 0 O) M 0 O) N 0 00)) O N CD N CO O) CO 0 O w y d U .1; 6 Nc) CO O d'0 N CD O d' N- 0)) O U) M N- 00) CO CO NU 0) 4- r4 a) (D 0 N- N- N- CO 0 O) a) 0) a) O O 0 4- )- N N N N CO M co .c 0 ) ( (NC N N ci. N N N N N N O >OCI e c co co J z a z co 0 W 7 0 0 N 0) M U) N- 0) a- CO U) N- 0) CO N N- 0) CD M N- U) T N- M d' d' d' d' d' UU) UN- N n ) U) U) N ) CD CO CD 0 0 N- 0) Cl) CO 0 a- (O (O .- (O (D (O .- (O .-- 0 .- 0 .- N Q) O N a) d' co co N- N 0 0 N 0 d' 0) CO 0 O CO N- 0 0 0 0) 0) 0) O O N N N CO M d' 4 d' co U) co CO CO NN. - M g — ,_ — N N N N N N N N N N N N N N N N N N N m = Z m a _l 0 (O M 0) CD N 01 U) N 00 0 U) CO d' N- d' 0 0 N- 0 COJ 0 0 CO 0) �- CO d' CO W 0) 0 r CO d' (0 CO 0) r O M d' 0 CO a N U) U) Ui (D (O (O 0 (O (D N f� f� f� N- t` f� 0 CO _ 0 0 t7 0 (n y ^ W 00) o N 0 N CO CO OV U) 0 ((0 CO CO 000 W O CO CO CN N ON CO CD m d' d' U) U] U) N U) N U) U) U] U) co" U] U) 0 0 0 0 0 0 0 0 0 a) = 0 a- 0 d' N- d' 0 N` M U) 0 (O CO 0) CO N a) co N _ O) (D N- 0) N d' (D N- O) 0) N d' 0 N- a) co a) N d' 0) co N 0 (O 0 N- N- N N- N. N. N (U 0 0 6 m 0 0) 6 Oi C) O) U) co d' N 0 0 (D d' N 0 d' 0 0 d' N 0 CO CO ',- 0 O N M CO d' N CO N N- N. CO 0) O .- a- N CO CO 'd 0) (nO 0 $ U) N N Ul U) U) U) N U) U) U) U) U] Cn 0 0 0 0 0 0 0 0 co- = CD (D CD 0 (O (O (O (O CD CD CO CD CO CD 0 CD (O (O (O CO (O CD CO CO 00 0 0 CO CO CO CO 00 CO CO CO 0 CO 00 CO CO 0 CO CO CO CO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 • M M M M M CO M CO M M CO M CO M CO CO CO M M CO CO CO CO E _ N °... 0 A Qm Ti Q N- N- n N- N- N N N. N- N N- N N N- N- N N N. N N N- N N. Q (O (O (O CO (O CO (D (D 0 (O CO (O CO (D CO CO (D CO CO (D 0 6 (D CO CO CO CO CO CO M CO CO CO CO CO M M CO CO CO CO M CO M M M CO U N 0 U C co 0 U 0 CO co (0 O O p_ L t > > 3 a >> c c CO O 2 m IR 2 9 Z d D_ d D_ > (0 0 0 0 0 0 0 0 0 0 CO 0 0 0 0 0 0 0 N- 0 0 0 0 0) O O 0 00000 OCD O CD 0 0 0 0 0 d' O 0 U) 0 Q U)) UN0 O 0 0 0 0 0 0 0 o V 0 0 0 0 0 0 0 UM) 0 0 m 0 m a ` N- co a) o .- N CO d' N 0 CO N- CO 0) O a- N CO M N d' U) U) 0 to O F co- C N Ui co (D (0 (0 co- 0 (D (D (0 0 co- N n N� N- N� R' N. N. N` m N- N C .. = 'O 0 0 F F (0 41:4) a y a m c ° E• o d d d A N U 0. cn 3 3 0 F. • • OO W co O V V0 0 0 O 0 00000 0 0 O 0 IO W N- N- CD O o 0 0 0 0 0 0 0 0 0 0 0 a Z o ui ui ui Vi ui ui o o o 0 0 0 0 0 0 0 0 0 0111 sw, _ 44 d m c. v, 0 0 0 0 0 0 0 0 0 o O 0 0 0 0 o O O O O a C m a 0 V) LO N In N N o 0 0 0 0 0 0 0 0 0000 Z d d U O N N N N N N O O O o 0 o O O o O O O O 0 co 2 N, co a N NN 03 7 0_ 0_ J O = = 0 O N O) a' DD o u) u) N 0) 0) (0 O O O Y O CD Z N CO (0 0) N (0 co co N N V) N CO V) O N u) W N (O 0) N (O O Q D) fD (D m (D V a) M V fO W OD C O (D N V V !�\/:N 3 V u) D? O O N OO O 00 (O O V COW N (O O V 03C") V© 0 , CO 0) V 1. 4 M N V N: r- o Oi N- u) V N 0) N- c C C Y 6) u) N N O CD u) V N O 0) 0) N N 0) CD CO O CD co _ N N N .- �-- r r r O O O O d) O) W D) CO CO �.d O E co" OD OO CO CO O O Oo CO CO CO- CO 00 CO- r` r` N- N- N- n d CO CO E .y c0 co co co co m co co co 03 co ro ro 00 0o m m C0 m 00 m N O O 3 c a IL u) V) V) u) u) N V) u) u) V) u) u) N V) u) u) u) co V) u) > > w CO u) V u) CO CO 00 V 0) 0) N- CO O) V) N CO 0) u) N N 0) V CO O) V V) N- (NI 0) V) O (O N n CO CO V O V 0) CO N CO 0) N 0) CD 0) r� u) N O N- u) N O W (D M OD O O) CD u) M N 0) co M O (D M O N-: c.) .a ca M (D CD V V CD OD O O N N V) 0) CO N- O V O c G C co_ CD CD N.- N.- N.. N- n N CO 00 CO 03 CO 0) 0) O O 0 a- El r ,C N N N N N N N N N N CV- 2 N N N N N M M M M y �+Z = t` N- N- N. n n N. N- 0) C ce 0D N- N. N- N- N. N. n N- N m 0) 0) 0 O 0) 0 0) O) O) 0) 0) 0) CD CD 0) 0) 0) 0) V) u) u) u) u) u) V) u) u) u) V) u) u) u) N V) u) u) V) u) 0) O O C 2 0) u ei c = d p U C 0) 7 O N M M co r-- co a) V M O) N aD V O n M (D u) ` w (D N- u) O O CO CO W V CO V) h CO O N CO V) ID CO N (D �_ V N O (N N M V V) CD 0) O CD N O w a) U N co O V N. a- O) r r N V V N.- O CO CD 0) CO CD 0 U W . R' a O1 V3 V V V V V V u) VI N u) u) V) CD O (D CD f� r rt d L d d N N N Nr. N N N N N N CiN N N N N N N N N J Z N O W 0 Q 4) W N O N- CO (O CO CO CO CO V) OD CD 0 V OD N (O O CO n TCO u) 0 0) a- CO (D (D V) CO N- 0) O CO V (D N CO N- V! N V N u) Q) 0 r- ui (O M OD N N W O M a- ?- N V! CD O M V V) N- CO 0) a- a- N 0) N CD O CO r- N- N- r CO CO CO CO Co OD CO 0) 0) 0) 0) 0 0 N a I fn a N N N N N N N N N N N N N N M M M M M C) m Z N u) O M M O u) m O O O CD N OD V O n CO W V) Mo ul CO O V N. O O O N 1` a- CD a- V) O V 0) a do T 0) N6 6 OD ui r� OD o C') O OD u) 6 o Co V) N N N- co n V V) OO V OD OD CO CO N O 01 CO N- V) V CO 0) OD V V V u) CD O CD N. N. N O co W O O ,- N CO V N co) ci) (D (D (D co- cD (D CO CO (D (D CD (O (D 1� r n N- N- N- N 3 0 (n O u) Co Co V) O CD V u) u) N N- CO CD V) N m V O co 0) V N 0) V 0 1� 0) 0) CO N (D V) O u) 0) V 0) Cr; 0) O M O 0) CO O t` au O V W (D V CO OD M N N. 0) N- V u) CO V (D 03 CO CO N O 0) CO N- u) V M LO V) V) CD t` r` C CO W Co O) 0) O N CO V V) (D O ._' CD co- (D CD (D u) (D CD co- co- (D co- N- r- N- n NZ r� r- n 2 co N O u) CD V) 0 O 0 O O O O O O O O O O O co o v r` co 0 0 0 0 0 0 0 0 o O 0 0 0 0 CO Oi 0 0 m O) o 0 0 0 0 0 0 0 0 0 0 0 0 0 N - s- N N N N N N N N N N N N N N M COM CO CO M co M M CO CO CO M CO CO M CO CO co co CO E 2.. N ° a m N 1 a u) M V ODN O 2 O O O O O O O O O O O O O g N- m CO CO a0 O O O O O O O O O O O O O O (D N V N o T D1 o O) T O 0) T 6 D) Q) of 0) 0) 0) QMO M co co CO N N N N N N N N N N N N N N N V (0 a0 m U N - C r— r- � E CD as O D O O Q 0 L L> > H O O -a m c c O co Oin L 0) 01 o o Z 0 CL D CL > CD N u) O C) N- O V ° O N CD CO 00 O O O 0000 LOU.) r O O (D O 0 O O N N N 00000 0000 T V J N- O o aV O V N o 4 OD (O o 0 0 0 0 0 o O Oco CCI N a OD O O N- O CO N O N V CD 00000 0000 Q ` CO (D Q N. CO CO 0) 0) 0 0 V) O V O > — N CO V u) (D N- CO 0) N0 e N r N- E N r- N- V N- N- R co co Q OD Q OD -I co OD co- co- co- co- co- co- co- N .. .O rL Cl) F J fn H F 1- . N G V . d O C c O 0• D m 3 3 o D C (ti • • 1111 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o (0 W 0 O O O o 0 0 0 O O 0 0 0 0 0 0 0 0 0 0 a 11111.0i0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 `W; y m Immo a) a) o O LL O O 4 ca ca ca so =C O O O O O O O O O O O O O 0 O O O O O O a. m a) c"' o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Z n n O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o OU Z co N. N. < w N N a sa J o = O p O- (U U) Q' 3 3 R U) U) O m 2 co O O = O O Ti N CO N 0) N U) m W CO M m f� 41 CO U) CO CO CO CO N m m O m N N N O O U 0) C) CO CO I. m N V co N U) > l.�\Fil Q 0 N m el 0 V' CO CO ,— O 0 m M N I- M N— O In N, @© 0 , N- CO V M .— O) m m N.: m <T M .— m N O ‘- m N c c c Y in N 0 l6 l6 E co co'- .F. o 0 n co^ co m (O vmi U) a CO CO o E N.- ... = m m co� co^ m m m m co� co� m NS m m m CCO m _ U) U) 0 In 0 U7 to to 0 In to U) U) U) 0 U) 0 U) 0 N > > H LW W 0 x— N- •-- CO CI) V CO O m m N m K N- U) O O m m W O U) O) CO N N. m CO M 0) U) m U) CO M O CO a) U) CO M 0 CCO (00 .' 00 (m+)( u) o G o v Na N- v o I� Ci v . n v 6 6 c. U ao U aO) V CO coa ) N m O O CO N- N- cr CO CO N U U) CO C 0 C c- N N CO M CO CO co V V 4- d' co (n U) U) U) I" L+ L ✓�' M M M M M M co- C] M M co- co- co- M M M M C) M C) w m N- m N- rn rn rn N- N. N. CO 0) N. N- 01 N- a) m m rn N- O) N 2 ON In U) U) U) U) U) La U] U) U7 U) Lo U) U7 N tU) N U) U) Le z a N .� O U R C V y 3 N N m CO V N- U) M I,- O m N CO a) O U) N W 'O y C U m 0 ,— Cr M U) m m CO N 0 (— M V V co co co CO N 9 N w (i.1 a) N V U) m m m OO) O N M R N M U4 V y m T N CO N U) U CO CO CO m � teWm W a) N- O O O O U. N- . — co L a) .O ri - N N N ( N N N N N C) () M M C] C7 M J F zd 2 fn p W a 0 a- N CC N- ,— U) co w CO I- CO O V V m N- N N m V V0 0) T V N I— M COm O) COCOcr m a) ((0 m O O N I� x— O] N U) N O) O m M C') O aD Ln m a) N V a) W co co co a) N m O) O M N- N- ,— V co co .— N V U) CO N N N N CO CO CO 'U V 7 V U) U) U) N (0 co U) m m OrCO m x. co" M M M M M M M M M M M M M M M M M M M W C Z 7 m m Oo Vn O CO O � CD NO coU) 1f) (p U) O 0 0O °) O V o 0 W O I� U) N O M f` U) N O I. m O) U) m N 7 co N O W CO N. IN U) R M N O co co CO U) a) m N U) m I- N. N CO Cr) W o c- N— N CO Cr Cr V V U) 0 CO r.: I': N- N- N- N- n N- eD m eD aD c0 m m CO- a0 m m m S C a U) co N 0 0) 0 (— U) N- U) M O m N U) (0 CO U) V U) a) Mm co NN. N 0) m a) m O U) a) C) T Q) V0) T CO N- m M M m 7 m M m m a) U) m M 7 CO N O 0) CO I— N- 01 V Cr CO N O '— m 0)N. CO CO CO W O O N N CO <t0 U) U) U) ((a (ma N m o E N- C- h N- N- N- m m m m m m m m m 03- 2 N O O O O O O O 0 O O O O O O O 0 O O O O O 0 O 0 0 0 O O O O O O O O 0 O O O O O O O O O O O O O O O O O O O O O O O O O L N N N N N N N N N N N N N N N N N N N N M M co co co co co co co co co co co co co co co co co co E •N ° coa- co Ti Q u) o O O O O O O O o O O O O O O O O O O O o 0 0 0 0 0 0 0 C. 0 0 0 0 0 0 0 0 0 O o Q 0 o) o) of rn o) o) of 6 o) o) o) a) a) o) 6 rn o) 6 o) N N N N N N N N N N N NNNN N N N N N a) U T U a) C 0 U m m p a)) m O O d L o a > > 3 € 'o > c c co O 2m m L. 9 Z O_ d d 0_ > m O O M O O O M O N O o o O V O O m O m Z 0 0 O V O O O ,— 0 CO 0 0 0 O CO 7 O U) O N T V O O O O O O M O m O o O O o1 co O O O (aa) co O O - O O O O O co O o o O O a) OO a m 0 0 — N co V V UUm CO a) O) a) com N o Yo) o) o) rn om oW oop m m U om o Q o g Np c ' coNd yH F F F F F F.. 0 co '5rn E 6 _ W ` .. co O0t . ONU an D co a • • O O O O O O O O 0 r 00 .- co V N N O O O O O O O O O V CO V f� N N a Z O O O O O O O O O N (+j ▪ r- 6 ^ CD p co k A. N N N N N N d m Mil� R o O O O gLO O O O O O O O O O O O O O O O O O O L.L. C C d O O O O O O O O O O O O O O O O O O Z d d U O O O O 0 0 6 0 0 vi N) N] 0 u7 CO l(] M co Z r r .- r r I- n Q al U) N N O_ d J p V r O a O N N CC 3 D N N7 d O a) 0 O C7 3 O O (U V Co N co O O N (0 C- V M CO CLIIO 0 O /�� Q O co 0) N-0 0 (0 0 N N CO a) N CooCOD COO CO^ N W ©G O CO O (O 0) (0 CO (0 CO CO CO O) co N 0 CO N V O co CO (p N ,j N In CO CO N (0 (O CN 0) Cn CO N O C C C Y O co N N N O CO CC) l0 06 E CO C O. 7 V 7 O. M CO CO CONM M M coj 0) N V 0 N N O m d ,E .N Cl) W a) m m CO^ m m W U) m m N: m m CO m COCU) It 2 w w �. (0 (D N) N) N) U) N7 N) N) in N) U) In N) N N7 U) N7 I- U) N 0 0 co CO O (D U) N N a) M (p CO O 0 N- N) U) (0 N O O (D Co M R CON a) OO) Co 0 C00 O) o CC 0 V Co M 7 N O Co . co N- .- C'i N O n C G C 0 U) N U) co (D (0O CD CD (0 CO N. N. N- (-- CCO CO W ad. L L C co M cocoM M M M M M M M M M M M M (7)- 4! w CO... v .2.. 0)) 0) 0)) Cr) cohON. ff) N- 0) 0)) 0)) 0)) 00) N- O 0)) 0) 0) 0) a> r2 Z O. _ _ _ O 0) Cl O N) Lo (O 0. (O N) N N7 co N7 N) (O N7 N N7 (0 co. Lo d C O Cd G CU _ N- y V d V O N O N N f` (O V M o co N 0 M M 0 0 CO N C CO oo O O 0 N 4 d w 16 47 M N7 N- 0 U) r N n N- Co 0) M N M 0) o 4-,,, d () N 0 0 0 0 O M M (D Co N- N- 0 0 N 0) C` O Co CUCC d' T W N N N N N N N N N M M V N) N) L d d co 0 Cl- C? M (? (? (? (? M M COCO- c0 CO- COM 0 u > 0 0 Z 1.4 U H J 1- m 2 (p o W 0 0 N 2 N) 0 N- CD U) 0Ln r (D CO O V Co 0 a n V co co O) (0O M CCO 7 CO '- V n a) N N O 0 N 0 O Cl) (() M 0 M O CCtD ,- N) N- M N. 00i CO (0 O CO 1� C- r- � COn CO CO m 0) 0) 0) � - C) M M C' M M M M M M M C' M M M M Mrn M -IO (0 a O a) Co 0 O O O O M O O O CO V v M O M 0 O 0 O O O O O O O N M M cO CI' CCo Co (o t` CO Cto (` ai N M N) 0 O (D O CD CO N Co Co CD 0 Co UN-) 17- Co 0 CO c0 CO CON. Co 0)o 0) 0 a) 0 Co CD m o au au CO- ao o au co- o CO- CO- au COau COCO- CO- 4 O a N) N .- V co 0) N N N 0 N) (f) U) Co 00 0) 0 0 co M 0 V 0) Co O 0 0) Co 0) 0) 0) N O N c{ CD M O 4 o N) O 0 N V (O U) N- O N 0) co CO N- N- O) U) 1� .- N M V N- N O R I,- N. co (` N- 0 N- aO Co 0) O O co 0 0) o O o O O G F 0 co co- coO CD co- co- co. CD co. coco- 0 0 0 0 a) g 0 0 0 CD C) 0 o O o O o O co O O O O O n N. N N N. n O Co O O O o o O O O O O N� V V Co O M MM 01 NM O O a)coC') coC') C) () coM M M coM coM M M M N= E N :� a m 'N a Cl) o cl o O o V Co Co O Cl) 0 0 N) Co O N- O Ni. O rj O O O a0 N N V V7 Co 7 co 0 0 O N) 0) 0) O) a) O N) 0) O M m 0) N) Ci (+) C) N) Q N O N N N co co M M U) Co 0 0 N 0) CO NF V U• (TD _o V L.' O O v.." O d CO -Q O ro O C p 6 E d 6 0 0 0 tl 0it u. 0 0 r 73 J > c c c0 0 0 o 0 (U (U 0 0 0 Cl Cl Z O_ CL O_ 0_ > 7 L O Cco o V CO No U) N V . O .- N O o O N- 7- O M O O fn O O r co to O O u7 0 O O O 0 O 4 >, co• N 0 O O O N O ori O 0 1� 0 0 O ci N (C) N) o O O V 0 O ,- a N N N n M CO 61 M M V V Q V N) co n Co CO 0 ?= N o o o o o 2 0 0 0 o W o « O o a o Z o d o 0 0 o a o T « r _ rYe- ( craa r r N` m CO 1,- CD I- d I- CO F V.0 C .V. D d o C E .O yd C cooN 0 la a 01 • • Ln O 0 O O UON-Um O o O O O O O O O N N V U) O O O O N O CO 0) a) 0 0 0 p O O O O O m m aIIW 6 o O O O NO M o O O O o O O O o .- -'��1 co CO V V V m 101.WIlimg; d 0 d _ Ro 0 � � o g_ co O O O O O O O O O O 000 00000 O O O O a NN `- O O Co O O O O O O O 000 00000 O O O O O a.a a ui o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o v v v U N-co ( < >a CV CV N 0_ 0Q J D O 0 CIN N J = 0- ..11 ui u) d 0) o (0 O o 3 Y O O (0 N O0 (Q co co co N. N- V CO W CO V U) CD CD 0N.) CO O CO CO 0) m p 2 - 0) co co N U) 0) CO 0) 0) CO V CO O CO CD 0) N 0 N N-0 CO U) > !�\/,l) m m .- N V U) 0) r O) CO O M CO C 0) [Y 0) u7 O r U) 0) all V G 0 ( N- m X- m m O N V N V V m 0) V m 0) N m C C C Y al co m N- N- N m CO CO m N CO m CO 0) 0) 0) 0) O .- O 00)) co (0 l6 l6 E co L 0) d) m f� N- m In U) M N .- O 0) CO I� n m m Ln N Li.' d d m m m m m m m 0 m m m m m m In co- co- U) U) U) U) — CO CO d g N m m CO CO m CO CO CO CO m co- co co co co co co co co m m m m Ln U) In In L[) In In Ln U) U) Ln lf) U) N U) In N U) U) N U) In I- 2 W W N- co Ln 0) m N N- N- 0) 0) N- 0 V N O 0) N V 0 U) CO U) m N V O CO O N 7 V 0 CD I,- CO 0) 0) O U) O co co N CO 0 V 0) O O m I� V CO U) N W m U) 7 0 W O U) m N N N m N- m m V r- O) N V N M O 0) V -0 a) .- .- co co N- m 0) 0) CO I- m V N O N- U) CO 0) 0) m N- L O L 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) CO 0) 0) CO CO CO CO N- N- N- N- a) L L U) co M M M M M M M co- co- M M M M M M M M M M M M w • �, W m 0)) W 0) 0)) W N- N- 0)) W 00)) 0) 0) 0)) N. 00)) 0) m 00)) 0)) 0)) m cZ Ln Ln U) U) U) U) U) V7 Ln N In Ill U) In Ln Il') U) U) Ln U) U) In d C O R dd ._ d 2 'O C (.) y 7 N O 0) CO .- r U) N 0) N. m N m O V m N m CO a- N .- O d N w C .) .- 0) V O co co 0) ,- N- N O CO U) M 0 (- co N R O CO CO M4 0) 7 .- of N- U) h co co M of N V N6 7 m 4 m O y d 0 N co L[) V V 0) co co co co 0) co co M N N N N (V O N 0 T N co CD t` CO CO O O O .- a- N co R N CO N. m I 0) O O O L d a ,..) r) r) C. 0 v I v 1" v v Y v v v v U U) In In To O ZIC J 0> 0 to U W 7 -t0 a' N Ce U) co — O o co U) o U) U) U) V N 0) m I- N N- 0) N co m .- W N N 0) W m N• N O o CO m U) V co N 0) I� M 6o N N M .- .- Ci N O 0) ao n m U) I� V N co ` O O O N O CO O O 0) 0) CO m V r- 0) N. U) CO a- .- O O O O o 0) 0) 0 0 0) 0 0) CO a N wr V 7 7 R V 7 R d' V' V V V 7 M M M M M CO- CO M a3 G Z CO Cl. �cll l CO O M m M CO 0.... O CO_ N- co m W O N M O W O M �l N N O 0) M N O co 0) 0) 0) O O O o O 0) 0) O I- N U) a- O) N. Ln m U) V' In m m o O r .- U) U) N O 0) co N. N- N- n N- CO m OND CON000 CO COOd CC 0) 0) 0) CO CO m CO m CO CO m CO CO CO CO CO CO CO CO CO CO CO Cil m m CO. CO CO- m m m CO. m m m m m m m m m m m m CO- CO Ln CO a- CO CO N N m N M CO V Ln CO m I� CO U) V U) CO N a- O o CO N N 0) O N 0) 0) 0) W W 0) 0) W CO 0) 0) m N- N CJ m m h: m 4 In U) Ui m N- ca 0i O .- N ai M vi U) co co O 0) m N- N- N- N- N- N- N- N- N- CO CO CO CO CO CO m O O O O 0) 0) 0) 0) 0) 0) 0) 0) 0) W 0) 0) 0) 0) 0) W 0) 0) ❑ x—, d) CO CO 0) CO- c0 Lb m m m m o0 m m ao eD m m m m a0 CO- 2 2 M N- O M 03 a- v- .- a- a- r N U) O h m CO CO CO CO CO CO CO CO CO N V CO L 4 m co4 4 o N O) ai N- N N n n n N- n N- N- m m O co N. LO m U) U) U) N N U) In N In U) U) U) m 7 N N N N N N N N N N N N N N N N N N N N N N E I. _ 0_ Qm N Q U) 2 U) N In U) O) W OM N O N N N N N N N N N a- 0 0) N N N N N- U) o O f` V V V V V 7 V V vt V m O N- N N N N (Ni N m M o 0) 6 n a) W O) Q) a) Q) m Q) W O) O N Q O O O O O N 0) W O) n m m _.r.- m m m co co m co co co m co 0) TN. O) O) co >. d ^ co r lo N 0oi 1 t0 h m a c _ o vi E d (a6 0 0 d N 0 m 0 0 a L d > > 3 -O F F- -O LL LL -0 -- 0 C m O O O 0 0 O 7 m L0 0 O t O O L O O O O Z d d 0 d > N- 0o 0 o co - O O M O- O N V 0 0 0 O O O 0 O 7 0 Ln O o 0) '. co O O V (no O N NON1ON U O O O 00000 a- o N. O 6 oO C)N- NOC) OU) 0OV 0O U) 0, 0O OoOO CO 0OO 0Oco Q ` co 01 0 0 N CO CO V V U) 0 N- CO 0) O a- N N CO CO � fn O0.' al a- .- A ,- .- y m .- r .- .- ,- N N N .N- 0) .-N N 0 C .. ` . 2 v N N N N y N N (0 V L W a d a m L o O :: d d y R co 0 O a` cn330 a C 0 0 y O 0 0 0 O u7 0 N N N V M O O CO O) O] .0- 0 0co (O O O O O V7 W CD V V CO M O O W V .- (D (17 O a 0 0 0 o N- r; N: 0 0 v v v o 0 0 k. V N N N N N 0) 0) O) 0 O 3 CO o Jou iF 0 CD 0, O O O O O O O O O O O O O O O O O O O O N N d O O O O O O O O O O O O O O O O O O O O Z d d U V O O O O V V V V V V V O O V V V V V O 0 Z U co co E N N < N N N >T 7 CL 0 Jp t t 0 0 p N N a 7 0 0_ — (D U) N m Un 0) O O 7 Y O O N W 0p l0 h O C) O r 0 CO W NN.- M 0 N N- CO M O) N. N- (0 Oi a W 0 W N. V CON (>) CO V CO M r 0 O) CO 0 O) W > /tel/,alV N- CO V O `- CO N. N- 0 CO m V V U CO 0 T N N Ol M 0 W N V M T 4 U) W I� I. c c C Y rn 0 0 rn o N- U) W U) U rn (p (O (O E co co C M N 0 O O Q) O) W co N- W a' !1 E_ G� N ccoo COWco- 0 UUo 0) COWm co- COCCOCU) m OD 00 W(C m COCCCO 000 .) O co j •C a (6 3 U) U) N U) U) U) U) U) U) N 0 0 U) N U) (0 U) U') U) In CO W W V O) N W CO V U) V co O O) M W N� co V V N. O) W CO V 0 CO 0 O) N W _ W N- 0 0) N N- W V N O V W N O CO V0 O N. N M O CO W O) d 04 N. 6 V M N u1 N V N N N0 N V W o N) W N CO N 0 O O O) O) CO CO W W CO W W O) O O C t 0 C coN- co- C]N- N. N-N n N- N. W (O W W W W W to co W N. N- E V M M M M M M M co- M co- M M M M M co- M w W t" 2 N- N N. N. N- N- N- (� N- r N- n N- N- N. N- CO Z rn m CD CD 0) N.- a) a) rn CO a) 0) rn a) O CD 0) rn a) 0 CC N U) U] U) V7 U) U) M) U) In U) N U) U) U) U) co- N U) U) c 11.3 O d C ii; ,,• L V c C () d 0 W CO N. O) N- O) O) V W N. 0 V CO W 0 y C U W O) W N O W V N. M O V W W W O W N W Q d w N M V M N O NN. O O n r O) O O) O) N n W 0 O w d U N N r W <- M O U) O V O O W 0 N O U N cc T N N M V V N (O W CO n N N.. W W O) O O ' ,- N m t m a (0 (n (n (r v) U� v) u? � u) ui U? 0 0U? ‘9.- (o (o (o (o T. N J I- m 2 NA O W — O CL N Qt N 0 CO W V CO O V CO W CO N-. N- W f� co co V V T a) W •- W W V U] co co U] M CO W V co co TM - W W N W V CO COW (D V COM N N co co co co co CO N CO CO V (O co co co co co co co co co co co co co co CO W CO W CO CO aNR M M M M M M M M M M M M M 0 M M M M CO- M co O Z (D a. V V W W 0 0 N 0 N N W W O M W '- CO V N O) N W O O W O 0 O O V 0 (n M (.) O N O V O) T W W O M W V W W [O ^ co N- W W (O N N (O W W W W W N- W W W CD T q) XI y W co co co co co co co co W co co co co co co co co co co W W W W W W W co- W W W co- co- co- co- co- co- W W co- CO tg Ct. 0 N CO N W O) .- (n (O CO N. 0 0 0 _ W M V7 W CO W N V CO N W O O) O) N O) 0 O O) V W V N W .. N N O O W 0 ,-: 4 0 0 4 N W O N O) co CN-D N) CO W W0 CD W CO W W W co W CO W W a) d) W m 01 O) W W O) W W W O) W a)O) co T co co co W 0 F eo 0 UD au eo co- 0 co au W ao (o ao W co- co co m ao co- 2 0N co CO W W W V M O C) 0 N (n N N 0 0 0 CO M CO O O O O O O N- O N N V V V V N N (f) W O) N N 0 N 0D 0 O) O) O) N0 CO O O O co (D W W (D (O W W CO W W W CO CO N. N- N- W CO CO 3 N N N N N N N N N N N N N N N N N N N N EN 0....-. a 0 co •.1 Q 00o LO o CO mv rno o M 0 M M M M CO N O rn ON- W o o o W W W co N N fo m (r7 4 (O Q O) n W co co O) Y) O) O) CD N CO CO W CO a CO CO W W CO V W OD CVO n V U) to p o >. ii �.. V r V p V 0) m a) C ,- ,- co co V E N c co co O 0 < 0 C. j j 3 a O O m u.O O r > C coo O I— ~ F- ~ O O E NY7 N l0 O t O O O O O t Z a_ d a. d > (O o O O O W V O N W V O O W N to . O O co V O W O co O O O N cn O co V y o O V V y o O 0 O M y 0 CD O a T r N m o 0 o rn J o of J o o N.: o m ooupoco N O M O 0 0 CO 0 O N W CO O O 0 O _ 0 a ` V (0 W N. N. CO W CO O) O O C) Ce c. r N CO M V V V) = N tN N N N a N N N t N CO- CO- M t M M t M M M t M M t M N T co ON r r r rr CO .- a- .- NU) ` N` rU) N a Cl) a N Cl)N C .. 0 a y o c . .o 2) E _ coo gc Om a Do 0au) 3o C (o • • N O O O O M N O O O OCO W O O O T 00 0) O M O O O a • 0 0 0 0 0co 660 0 N N j M. d co WO I- O 4_ o 0 OO o O O O O O O O O N N d O O O O O O O O O O O 11 o O O O CD (D CD CD CD (O O O 0 z U N- r < N CV CV O_ D_ J a p = 0 p o CO N CC 3 3 0- 0 LD CD CD f2 co O O 3 Y O O co N CO (0 M O O N r N N- r CO (.�. Q CO 0 CO LC) CO CO > !a\G 3 N 0) 0 Sr. W CO O CMD (N CO0CO �/ �..� ( d) of O N V W N r N C C C Y N O N N CV N N IC) N CO lQ (0 (0 E N M M M N N O 4) Q1 Q) co 0_ D- O_ 3 C '�' V V V V V V M M M M W _E 'y CU tO 0 CO CO CO aD OD CO 007 CO CO _ Ln lD LD u7 0 0 In LO In LO LO > > H 2 W W CO LO N O 0 a- CD M N- CD CO N- CO O aD O) N V a) O V (D N C) O r- N r O CU (O CD N N M u) 0 O O N U .a p) co co M LO LD (D r N- pD CO CO C O c r r N N. r` N- N- r r r r t ;C = C) C) w d _ rn rn C) N- 0 C rn C) 0) N- a) cZ N ()7 (C7 LO 117 N l!7 u7 N N N LD 0 N y C N r- W C d y (N Ca (D C_ d U N C 12 C O U O CO CD (D CO 7 N. ' N V O R d 4c. w N CU N M M a- N O (O M p O y m U N O O O O O Q) CO O N 0 d K aj A CO CO CO 7 V N 0 CD CD CD 1,- 70 Q E2 .0 a) d •N• CD (D (D Si- CD (D (D (O CD (D (O r �' LO Cl O p N O O J 2 2 Cn p W v C y 0 O LO y m v O O n C2 R N o C CC co co a) co CO N CO M C O a) N-- O al V LD (C) N V O CD CO N O r M M Is cc; M M N a) a) r r r 0) m O N N N N CO CO CO CO CO 0) CD O 0) O) CD CO- LL O y c. M M M M M M M M M M Ca c Z 2 Co a- N O CV M O O N- V O 0) d) O O O O O 0 N O O W O 4 d r r 0 (N r N r V r O 1.- a) CO to 00) 00) 00) a) 0) O CO COrCO CO COCC co"u) g O ao O oD m O M 0 M O (0 o Q m E CO Z CC) H. co 6 LD HI rn V No rn a) a) co m a)O (O N N LC) O OO O O O co m m p k' a) W O a) 0) T O O W tO M 3 co M M .- O (D CO N- N N N a) a) a) O O N o) CO cD co o O O a) W N. N M Cl M M Co- N .0 co co co r N- N- N- N- r N- N- .. a- l- 7 N N N N N N N N N N N _ E O C N C O Ca (C1 N LD m O M CO0 Q o Ci o v r u7 o v) d N r r a) W 3 N CO CO- LO N 07 0 N- O cD CO CO O p 0 Op a) 0) a) O O CD CO -- CO 2 CO CD Q v4 v of o U) 6 U) �° 6 6co CO CO CO C) a) O O O O O (n (4 co O) OI a co M 0) U▪ N U C� 0) co M co CD CO -O tO co CD C •°�• N CC y L M co E N as O O co_ 0 0 1 7 p,S' of W co L L a > > 3 F H co N j N 0 .= C C CO 7 fU p O 2 co (D N 9 O O L OD r2 z O_ O_ O_ (L > CD O co CO O N- CO O O a) O O O) CO o M u) 0 V y 0 O CO ^ O CO O Q �. CO 0 o J O O J o o CD cr o Co m rn o p o o p o 0 CD r N O (D co a CC) p CD CO r CO 0) 0) a) O O C O p a- Q a- M •F,, M a- y co- a- a- J M r a- 4. (6 .O N c .. - N 7 F (I) y H N - d cV a� O c c co co a rn c c E o °) y -y a) A m o U a t%1 3 o a 0 C • • iA _Z �= a a SA CL c c a a 0 a 0 CJ Z r co < N N a a o x = O N N a' 3 a Ln in - LA 0)W L6 OO 3 Y O O > Ln co Q O aa''pp`� Q © > C U C m m E U)) a• o_o. = Q' E Zoo co co Co �•c Oa 5 > > H W ui u -o c G N L w d w 2 cc C 2o N .r C C V O =o d u u 10 d a w O _ O w `« a`+ N C) U Lu L CD a O >T.1 0 0 0 . A J i- E z N G a..., t O O a. N 1Y T N a T m "' N C N J U) a_ m N C Ca a to E to z N co D v m CC > a a t a 0 V W d < 2Q u D W-, J CO0 LL N (D O J < d , D I < J O N I i s D CO V I--, co I- O J H F- O H O CO H O H O H V Z V H 7 H H Z d 0 D D U) a m Ln Ln Ln Ln Ln Ln LO U) N lf) Ln Ln Ln to Ln 111 Ln Ln N Ln Ln N Ln N Ln Ln L0 Ln Ln Ln Ln Ln Ln LT QY LA LA LA n Ln T A Ln 0) COn 0) W CO O) W LA Ln 0) n O n T a) 0) ) 0) 0) (n 0) 0) C a jpL N. W W W O W V O I.M M) O I. W M LL LW O T fO LIN O fOI)) N LnV W W O LN W W) N7- C _ Q. m W W W N. CO I"- O Cr CO CO CO CO h LO O N O O) N fA N T /T O) N CO O O O N. Q 7 N M U >. QS _ CD _ N CO 'O W W p Te, 6 CO M V LWn O N CO W CO 0 CV el LO LO Cr V r-- CI 00 N N O W W O W LO V O N CO V W L] V CV M E y I[) 0 0 �- L. O N. O M W W W M O N O N , r V W O W W O .- N. V Ln O) CO W N LO O N L 0 a. > > 3 7 L" ;7 LO 0) O W N V V N. O CO N W V CO CD 0) N. LD N W N CO CO N. CO .- co O) M 'Q > C C W Lp a s .- O) O O N O M CO Cr Ln CO a- LA V .- a- O a- U] 7 L` CO W V V CO CO CO I� LO Ln W o ` m l0 a O � O M M O O co- Ln N. W N CO- O) V N O N W V M O V N N. V O O V O LO V V -,- zd a. o_ a > 4 W C N T dCR .. Colf. a y O C co •. a °' E o — mov0 LL boNc..) a. f) N CO • S Mimeu= 11. 0 o o a U CJ M r) Z N N� a N N 0- 0CL Cc CO O 7 d C) C) C OO = CA O O Q N C C c n d a) O O = C a ai U G m = w m 2 r c m c ai A U ai c a c Um f)m � w � Oua'. y a1 U a' U d a' d Chi O t' ZLa J > z to O 0 Q N a "'CO c EL CO o) a CO w U vQQ) a (7 ml N m > > , w u Y CO w 0 (-) w Y 0 m > m m = O CC U) H z O O Z H 1= I 7 lL Z D O ct l COO O H a LO U) U) U) U) U) U) U) U) U) LO U) U) U) N U) U) U) U) U) U) U) U) C) m O) CD 0) W 0) C) 0) 0) 0) C) C) 0) o) 0) O) 0) C) W C) C) 0) a OY c'i Pi (O ao:; N N L• O) f� I� ui Ln O) O Ci N O Ln V W R V Lc) U7 co N- N- V' LO aD N- Ln N- V CD O 0 L- U) U7 CO CD U) N N- C) co co U) O) co U) N (D h O) N N V C) Q N CO V N C CD CO- CO N vi CO CO N V .0 (O CO T N C) N R co V O O U) U) O W U) CD CD CO C) CU L- LI) C) N N- EN 1 O O c) O) CD CD 7 O C) U) N C') U) CA 1"-- O N- O) U) CO 00 .- O) 7 a O a W CO Cn ai N c'7 N Lc V CC CD V N CD V N Oi N aC) V cc; T M > > 3 W co O V V V O N CA N co co co co cO co LO co U) W N U) > C C dV N CD CA CO CD CO O) O O W v- U) I,- W CO V U) N O O 01 O m (0 CO O U) N co- V (O Z d LL d [L > Cb 0 Q 7N C .. CC a O c a a) 0 •0 m a) v cC • • Ill I IL • MICO logo o0 Q= 0 c6 a a a 0 U U z N. N- Q N N CL a ❑ z = 0 CO 3 CC U) 111 m a CO O) - m O O O Y co OO a a > UU U c m m E a a a E m ' aa- co co 2 > > 1- w ui c O 2 .0 w m a) 2 a' 0 a) uco) aci E o O c N w Ti O w m U N U mCe - K W L aa)) J 2 Z U) 0 t 0 Q N 0 0 0 0 0 0 0 v) N co 0) co 2 N O co O V O N O N N (O U) O CO L N 0• sf O OV O[) O O O) N R ON Uu') sr 00 (a0 m al M V N N to coM • co co co U) O CO N N U) (D U) O O O O V Cl. ',,, ,o 7 M M .- W co O N OO . O "I- N 01 Q v O M N ^ On) D- .,. C al 0 -mo U 0 -mo 0 ,� o U Oa u_ m Oa a0 m 0 O m 0 0 "" 0 O m U 0 a a s a m a N- H F- F- a s LL a m LL a a s zO CL F- O H F O h O U I- O O O O F- F- F- E- a F- F F- F- .O O O U) .0 0 O L 0 - O O O O O O O 0 0 O 0 0 O 0 O 0 O O QJ O O N- N U) U) V- U) 0 L O U) U) L O O L O O O O L O 0 L 0 0 0 - N N N N n N • O O .- C ,- co V• •sr O_ st• •a co V •C OO CD M (OO C a '6 ID n CO U) •U, (n IN O - fn - N-• /n - (p co co Cj fn -' 0) U !n (7 - r O d. N 3 '3 J O J J LD J N 0 J J J P J J N J J (O J J 0) J J ,- J J nj V "' CD E m m ❑ r- ❑ ❑ R ❑ N N ❑ ❑ ❑ N ❑ ❑ CO ❑ ❑ M O ❑ CO ❑ ❑ s- ❑ ❑ O `- a) r t C t r -c 'C r -=C -c C C C C t r r r C r r C C C 'C -cr -e r a) !D a' E m m m m m m m m m m m m (� m m m m m m m m m m m m m (( m ❑ . O In (n In V) (n (I) (n CO (n (n (n (n (n (n Cl) (n In In (n (n (n V) (n 0) (n (n (n (n co' F- O M M 0) N 0 N_ 0 CO 0 CO s- M N_ U) N- CO IN CD 0) 0) O 0 CO U) CO aD 0) 0 O CO N CO O (D CO. O N CO CO. N V OD CO O n s. 00 N- N V O U) n O V d' O O O I N 0) 0) r 0) M U) f0 g V M M O U) (D 0) N O O N 1 O 00 Is. c0 O) O O (D O M O aD O O N N O O U) CO f0 N O n U) � � � In co � � r N N O CO O r O O r � O n CO O r- M � (O n y W 3 N N (7 M M O`i 0.) (`� f sr to 'o N 1() " Li" LA OD OD (D (Q (Q 9 a) + — a 0 O 0 U O O 0) N CO 0 CD N M LD CO O U) OO U - Cl) NLD 0D 0 M n CO V CO CD V' CO To O .- 0o O ,- O O 0o .- h .- M N LD n (D N� 0) O CO O n CO sf CO. 0) U) O 00 I CJ J N O COO O O N- U) O m 0) n N- N sf h N d' OD 0) (O N n M 6M o COCD U) OD (Na) O CO N- CO CO O CO 0) M N CO V N- 0) N N st LD OD CO CO CO f� O O O s- O CO O CO CO CO CO CO CO OD CO CO O O -2+ N N N M M M M V stsr- CO CO M CO M M M M M M M M M + ". a m O (D CO 03 0 0 M 0 (O U) LD 0) M 00 U) N LD U) 0) U) 0 ^ N M 03 U) 0) CD O CO O s- O O .- CO O O O N N CO CO U) CO O N N O O 0) ,- CO CO CO 0) res _c O O 00 00 CO N O O O (O a n N N. tD U U) M M N OD 4 O CO NN- D N U, co ()co O O O O O N V N 03 LD n N n LD CO N- h CO OO 03 CD U) (O N- CO O O N- U1 i-. ' G N co U) co M M co co co N- n O O O O 0) O O O coO 0) O coO O coO coO O O O O Q 0 O a .- N N N CD CO CO CO CO CO 0) 00 CO CO CO CO CO CO 00 CO 0D CO CO CO 0) CO CO m U N _to CD m U CO co p 0 0 0 CO U) n LD 0) sT 7 V V N- N.. O CO N- LD CO (O (0 U) s- O CD 03 N- CD O a) m 0 0 Q '0 O O O O C CO CO LD O O O CO CO. 0) V N N ' n CO n '7 V O co 0) co V '- co < O a 2 ,L O O O Ni aD LD M V V 4 V O O O N- O O (O N- O C7 n CD O co R O CEL > > a) O O O N 0) CO M N CO CO O O V 1- N_ V U) 0O O 0 co O sr CO co O I.- co 0 m C O.S2 IR CO N m y< co (o O V' sr r O co_ O N CO n CO CO N CO. h 0o O M V' co n O O z a a s a > y CI .- N N M N- N- O O O O O <- ,- N N N N N CO M CO CO M M co V c a. O o N o'}4, c d c N )' ac A. m .. • _ ;ya" O O d d m a) 0 N U a. in a a ,I C� III • • ►rte= _- - - _ -o -- _ •- - -- -- Ingo . g2 , a. smso LL�oosg%�oog7oa,• �000;oo-00;`;,000- z C N.E ¢ PNN 8 gLdo g8▪66.. . .2 . . . . • o. ' -' :o 0 .g31co Amm 6m COCOmJJ `nwN CO U10 00 CO F CO iJ >�Jo�J gyp, --_._ - - _. -.--w, z -dmmo=oo o Ri000Nooidoo153oaS'ooc"oom— o ce3 ¢ G=Gm`mh �m k k-AN S-g-SAg -S-S.�e.Ne"ra'.�.�`ppc �� :8F1 ¢m m m m m m m m m m m m m m m m m m m m m m m m m l!m m m P //// ' N �888OWm�d335ooOr*38f9i�i<S>� .. o8�-�N N�N�3m 2,: 3 if (( MY 0888m88VFii3�?S�3f4g880 Rin88:=$983989 AllEdhignil c_. --0. I 85 ALO" m fig` -..___ -..__ mono m i 3 _ gao=l . a do Alz O O o o >@Jo�J' ) Y m e a-� 3 0 3l ill 1 �z �� LI d m m u v o, _I�l, ---- z m ---- -- _ PPE I W tz 2 m = II n 0m +00- AAs 0-7. mo��m ,�j Y ti�3Z� 3 Q ;_. m 0' L f�� Id m 3 3 ------ 17,E110 �`m m o 00 Oo o VAS MM' :t!--- g1 80-P1/80- ue o s li ������5�”�� �g 1i .� -, ___ - i -_ --_-- __ - .... i > g aS�SSSSSSSS 1 _� J - • 9 -- nl o o o 8 o o o -o,. --N q o _.P m > o O o 0 o 8 _ LI N , o - co m N , . O m �m rnp imp rnn'¢aS Qaa nP mppp ` '7 ii ii g 5 3 3 3 3 3 5 3 3 3 - N _O n F m (u1/+Jsn OSS) (+)uuoN/(-)u�nos m ri 4 4 4 4 4 4 8 - .Y °� c 2 9 288g8Og9gg8g888SS8 ._ s -g ' p w 3rn __ _ o-74 A oRi£�L'Ri s3"�a fr343S`.� 1-- . `4 g , .ZSOOg ��ci 33 c o w mo zv moo § o OMI 52 CC ' �o ym�� L 8 SS F- +- i W — -4 m o� - NNN o 30 i o 0 J Cmi�� . w m 0 00SII 3 z. e S Ti O r O a c w .. 5 4 14 �Y oI am o m - .„ - 20:4,--d No' c ,m - o pg G ac. c m li w Nroro -_ o. - -- o o O m O m m o� o � ii a3 m __-... -_- ._. I -- , - 8 N m .. O N > C / nO O V> C C 1 O N b ----__ ...m sz 6a >' 88RIA3<`S,�m�m83�o�mm�"a��°°Riu3',�o�,$�S�SB�a' o 1 51 ofE _ r-v .a 3 m n c a i 00��3 ��,' x, igOV l i`g�P,N�`��" ,,^o ig�`�I^`S 9a I1 1 _t - ' • °Ds a o a 88888<oS8S88Wa8 NS 5S8�38888898 j m n �oppovjo� .of000N0o0o,oQvo^goggai q o C J -ti--\y r -- ...-O F m 2888sK,as 38�saassss8gsssasssssasss O N N _ -� J OOO.,NN6SN6NiOocti,, ooc vvov vc dvd<Bcdo O 9 O. w 1 Wo wSSNm&8 �f�3m��fmw � w �' }I + �.- ,s g w i ` LV q • O� m o o 8.- A to�ig'a <§P3 Iii M R[�3 A3 a1 t�3 P3 R3 -�1 ; 'J\- N �_ z 888'899888 9 A3� 8 8853" W__I803aI33 v �8vn Ngo g`n�N N 0 .^ rte 4 I w N6111iiiiiMilligg21 o Nie o��a� �� m 82 o8 8888 m 88 ��889 s Zm 3Nmm Q :88884'482B888s8� -8095888882 8�� 3g �8888588�Z888585«888888 88888 _, P _ 66• 00 099 {A3A3O�0SsoosSiB$ �SSg�mB � U Om888S�MMMS881 WP���8P2* ,882 :22 > o > > c7 v m m a, 8 :0 o o I C7_. sa W z z _7 X O t, .a P =6 ai No � §�< � o � 84-smost �_ o s....m o _ o Q 0 0 0 za o INNNN �yA3� $ ,:''so 0p vi vi $.. N 8c N-Nm<a.Ol--mm.,.-C .l mm�m� .N CI M et h b P Rr���2� �4€i; u� ( ./a3sn OSL)q;daQ leohaaA anal • • North America - ALASKA - BP Prudhoe Bay PB V Pad Plan V-08 Plan V-08 V-08 wp09b Anticollision Summary Report 07 September, 2016 410 4 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan V-08 Project: Prudhoe Bay TVD Reference: V-08 plan©100.95usft(P273 plan) Reference Site: PB V Pad MD Reference: V-08 plan©100.95usft(P273 plan) Site Error: 0.00usft North Reference: True Reference Well: Plan V-08 Survey Calculation Method: Minimum Curvature Well Error: O.00usft Output errors are at 1.00 sigma Reference Wellbore Plan V-08 Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: V-08 wp09b Offset TVD Reference: Offset Datum Reference V-08 wp09b Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.O0usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,601.99usft Error Surface: Elliptical Conic Survey Tool Program Date 6/6/2016 From To (usft) (usft) Survey(Wellbore) Tool Name Description 46.95 2,000.00 V-08 wp09b(Plan V-08) GYRO-WD-SS Gyro while drilling single shots 2,000.00 2,910.00 V-08 wp09b(Plan V-08) MWD MWD-Standard 2,000.00 2,910.00 V-08 wp09b(Plan V-08) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 2,910.00 3,060.00 V-08 wp09b(Plan V-08) INC+TREND Inclinometer+known azi trend 3,060.00 4,560.00 V-08 wp09b(Plan V-08) MWD MWD-Standard 3,060.00 10,190.00 V-08 wp09b(Plan V-08) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 10,190.00 10,340.00 V-08 wp09b(Plan V-08) INC+TREND Inclinometer+known azi trend 10,340.00 11,150.00 V-O8 wp09b(Plan V-08) MWD MWD-Standard 10,340.00 11,150.00 V-08 wp09b(Plan V-08) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 11,150.00 12,650.00 V-08 wp09b(Plan V-08) MWD MWD-Standard 11,150.00 14,066.89 V-08 wp09b(Plan V-08) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 9/7/2016 10:27:11AM Page 2 of 5 COMPASS 5000.1 Build 618 1110• BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan V-08 Project: Prudhoe Bay TVD Reference: V-08 plan @ 100.95usft(P273 plan) Reference Site: PB V Pad MD Reference: V-08 plan @ 100.95usft(P273 plan) Site Error: O.00usft North Reference: True Reference Well: Plan V-0S Survey Calculation Method: Minimum Curvature Well Error: 0.O0usft Output errors are at 1.00 sigma Reference Wellbore Plan V-08 Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: V-O8 wp09b Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) EX WKUPST-01 WKUPST-01-WKUPST-01-WKUPST-01 12,635.07 8,950.00 1,089.12 11.43 1,088.57 Pass-Minor 1/200 PB V Pad Plan V-206(slot V-229)-Plan V-206-Plan#2 V-2 367.59 350.00 180.38 6.51 173.87 Pass-Major Risk Plan V-226(SL)-Plan V-226-Plan#4 V-226 855.60 850.00 90.63 13.79 76.97 Pass-Major Risk Plan V-228(S-S)-Plan V-228-Plan#2 V-228 393.03 375.00 60.59 6.11 54.48 Pass-Major Risk V-01-V-01-V-01 393.41 375.00 15.44 7.17 8.28 Pass-Major Risk V-02-V-02-V-02 1,361.70 1,325.00 89.75 22.89 66.87 Pass-Major Risk V-03-V-03-V-03 1,176.68 1,150.00 195.19 19.03 176.16 Pass-Major Risk V-04-V-04-V-04 1,506.62 1,425.00 164.48 27.77 138.35 Pass-Major Risk V-05-V-05-V-05 3,096.12 3,050.00 159.57 128.19 61.68 Pass-Major Risk V-07-V-07-V-07 527.55 500.00 188.84 8.85 179.99 Pass-Major Risk V-100-V-100-V-100 515.52 500.00 106.15 8.32 97.84 Pass-Major Risk V-101-V-101-V-101 1,648.61 1,550.00 189.77 29.05 162.12 Pass-Major Risk V-102-V-102-V-102 1,199.43 1,124.94 194.19 21.80 173.42 Pass-Major Risk V-103-V-103-V-103 293.44 275.00 191.51 4.84 186.66 Pass-Major Risk V-104-V-104-V-104 1,805.96 1,725.00 93.42 33.51 62.01 Pass-Major Risk V-105-V-105-V-105 1,259.86 1,225.00 54.50 19.94 34.69 Pass-Major Risk V-106-V-106-V-106 1,127.00 1,075.00 178.49 18.75 159.97 Pass-Major Risk V-106-V-106A-V-106A 143.15 125.00 182.74 2.67 180.07 Pass-Major Risk V-106-V-106APB1-V-106APB1 143.15 125.00 182.74 2.67 180.07 Pass-Major Risk V-106-V-106APB2-V-106APB2 143.15 125.00 182.74 2.67 180.07 Pass-Major Risk V-106-V-106APB3-V-106APB3 143.15 125.00 182.74 2.67 180.07 Pass-Major Risk V-107-V-107-V-107 1,467.93 1,425.00 49.12 24.16 24.98 Pass-Major Risk V-108-V-108-V-108 690.33 650.00 303.50 11.73 291.83 Pass-Major Risk V-109-V-109-V-109 1,227.12 1,200.00 158.79 19.10 139.76 Pass-Major Risk V-109-V-109PB1-V-109PB1 1,227.12 1,200.00 158.79 19.10 139.76 Pass-Major Risk V-109-V-109PB2-V-109PB2 1,227.12 1,200.00 158.79 19.10 139.76 Pass-Major Risk V-111-V-111 -V-111 1,298.08 1,275.00 161.81 22.09 139.75 Pass-Major Risk V-111-V-111 PB1-V-111 PB1 1,298.08 1,275.00 161.81 22.09 139.75 Pass-Major Risk V-111-V-111 PB2-V-111 PB2 1,298.08 1,275.00 161.81 22.09 139.75 Pass-Major Risk V-111-V-111 PB3-V-111 PB3 1,298.08 1,275.00 161.81 22.09 139.75 Pass-Major Risk V-113-V-113-V-113 1,037.35 1,000.00 226.49 17.05 209.54 Pass-Major Risk V-114-V-114-V-114 369.88 350.00 161.13 6.06 155.07 Pass-Major Risk V-114-V-114A-V-114A 369.88 350.00 161.13 6.06 155.07 Pass-Major Risk V-114-V-114APB1-V-114APB1 369.88 350.00 161.13 6.06 155.07 Pass-Major Risk V-114-V-114APB2-V-114APB2 369.88 350.00 161.13 6.06 155.07 Pass-Major Risk V-115-V-115-V-115 318.26 300.00 137.11 5.14 131.97 Pass-Major Risk V-115-V-115L1-V-115L1 318.26 300.00 137.11 5.14 131.97 Pass-Major Risk V-115-V-115L2-V-115L2 318.26 300.00 137.11 5.14 131.97 Pass-Major Risk V-115-V-115L2PB1-V-115L2PB1 318.26 300.00 137.11 5.14 131.97 Pass-Major Risk V-115-V-115PB1-V-115PB1 318.26 300.00 137.11 5.14 131.97 Pass-Major Risk V-117-V-117-V-117 391.62 375.00 74.78 6.55 68.24 Pass-Major Risk V-117-V-117PB1-V-117PB1 391.62 375.00 74.78 6.55 68.24 Pass-Major Risk V-117-V-117PB2-V-117PB2 391.62 375.00 74.78 6.55 68.24 Pass-Major Risk V-119-V-119-V-119 1,023.13 1,000.00 158.92 16.96 142.01 Pass-Major Risk V-120-V-120-V-120 268.84 250.00 225.82 5.36 220.46 Pass-Major Risk V-121-V-121-V-121 516.50 500.00 44.05 10.08 33.97 Pass-Major Risk V-122-V-122-V-122 317.98 300.00 91.75 5.35 86.40 Pass-Major Risk V-122-V-122PB1-V-122PB1 317.98 300.00 91.75 5.35 86.40 Pass-Major Risk V-122-V-122PB2-V-122PB2 317.98 300.00 91.75 5.35 86.40 Pass-Major Risk V-123-V-123-V-123 1,160.49 1,100.00 182.62 20.03 162.90 Pass-Major Risk V-201-V-201-V-201 3,830.39 3,750.00 91.81 49.13 46.23 Pass-Minor 1/200 9/7/2016 10:27:11AM Page 3 of 5 COMPASS 5000.1 Build 818 e • BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan V-08 Project: Prudhoe Bay TVD Reference: V-08 plan @ 100.95usft(P273 plan) Reference Site: PB V Pad MD Reference: V-08 plan @ 100.95usft(P273 plan) Site Error: 0.00usft North Reference: True Reference Well: Plan V-08 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan V-08 Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: V-08 wp09b Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB V Pad V-202-V-202-V-202 1,725.09 1,675.00 47.57 31.99 16.15 Pass-Major Risk V-202-V-202L1-V-202L1 1,725.09 1,675.00 47.57 31.99 16.15 Pass-Major Risk V-202-V-202L2-V-202L2 1,725.09 1,675.00 47.57 31.99 16.15 Pass-Major Risk V-203-V-203-V-203 1,452.17 1,350.00 255.64 25.91 230.59 Pass-Major Risk V-203-V-203L1-V-203L1 1,452.17 1,350.00 255.64 25.91 230.59 Pass-Major Risk V-203-V-203L2-V-203L2 1,452.17 1,350.00 255.64 25.91 230.59 Pass-Major Risk V-203-V-203L3-V-203L3 1,452.17 1,350.00 255.64 25.91 230.59 Pass-Major Risk V-203-V-203L4-V-203L4 1,452.17 1,350.00 255.64 25.91 230.59 Pass-Major Risk V-204-V-204-V-204 750.67 725.00 139.41 13.11 126.31 Pass-Major Risk V-204-V-204L1-V-204L1 750.67 725.00 139.41 13.11 126.31 Pass-Major Risk V-204-V-204L1 PB1-V-204L1 PB1 750.67 725.00 139.41 13.06 126.36 Pass-Major Risk V-204-V-204L2-V-204L2 750.67 725.00 139.41 13.06 126.36 Pass-Major Risk V-204-V-204L2PB1-V-204L2PB1 750.67 725.00 139.41 13.06 126.36 Pass-Major Risk V-204-V-204L3-V-204L3 750.67 725.00 139.41 13.06 126.36 Pass-Major Risk V-204-V-204PB1-V-204PB1 750.67 725.00 139.41 13.06 126.36 Pass-Major Risk V-204-V-204PB2-V-204PB2 750.67 725.00 139.41 13.06 126.36 Pass-Major Risk V-205-V-205-V-205 492.81 475.00 15.93 8.30 7.63 Pass-Major Risk V-205-V-205L1-V-205L1 492.81 475.00 15.93 8.30 7.63 Pass-Major Risk V-205-V-205L2-V-205L2 492.81 475.00 15.93 8.30 7.63 Pass-Major Risk V-207-V-207-V-207 547.70 525.00 244.17 8.94 235.29 Pass-Major Risk V-207-V-207L1-V-207L1 547.70 525.00 244.17 8.94 235.29 Pass-Major Risk V-207-V-207L2-V-207L2 547.70 525.00 244.17 8.94 235.29 Pass-Major Risk V-207-V-207L3-V-207L3 547.70 525.00 244.17 8.94 235.29 Pass-Major Risk V-207-V-207L4-V-207L4 547.70 525.00 244.17 8.94 235.29 Pass-Major Risk V-207-V-207L4PB1-V-207L4PB1 547.70 525.00 244.17 8.94 235.29 Pass-Major Risk V-207-V-207L4PB2-V-207L4PB2 547.70 525.00 244.17 8.94 235.29 Pass-Major Risk V-207-V-207PB1-V-207PB1 547.70 525.00 244.17 8.94 235.29 Pass-Major Risk V-210-V-210-V-210 244.84 225.00 241.26 4.06 237.21 Pass-Major Risk V-212-V-212-V-212 629.76 600.00 186.23 10.44 175.82 Pass-Major Risk V-213-V-213-V-213 293.05 275.00 121.63 5.13 116.50 Pass-Major Risk V-213-V-213PB1-V-213PB1 293.05 275.00 121.63 5.13 116.50 Pass-Major Risk V-214-V-214-V-214 906.27 850.00 260.72 15.82 245.06 Pass-Major Risk V-214-V-214PB1-V-214PB1 1,082.57 1,006.00 223.26 22.66 200.91 Pass-Major Risk V-214-V-214PB2-V-214PB2 909.43 850.00 260.77 15.87 245.06 Pass-Major Risk V-214-V-214PB3-V-214PB3 909.43 850.00 260.77 15.87 245.06 Pass-Major Risk V-214-V-214PB4-V-214PB4 909.43 850.00 260.77 15.87 245.06 Pass-Major Risk V-215-V-215-V-215 769.89 750.00 117.31 15.40 101.92 Pass-Major Risk V-216-V-216-V-216 219.34 200.00 196.73 3.80 192.93 Pass-Major Risk V-217-V-217-V-217 417.76 400.00 29.93 7.90 22.03 Pass-Major Risk V-218-V-218-V-218 344.90 325.00 208.52 6.46 202.06 Pass-Major Risk V-219-V-219-V-219 293.94 275.00 150.51 4.77 145.75 Pass-Major Risk V-221-V-221-V-221 371.49 350.00 183.35 6.43 176.92 Pass-Major Risk V-222-V-222-V-222 346.51 325.00 194.69 6.09 188.60 Pass-Major Risk V-223-V-223-V-223 594.44 575.00 29.74 12.43 17.30 Pass-Major Risk V-224-V-224-V-224 219.14 200.00 166.20 3.88 162.32 Pass-Major Risk V-224-V-224PB1-V-224PB1 219.14 200.00 166.20 3.88 162.32 Pass-Major Risk V-225-V-225-V-225 1,108.33 1,075.00 204.56 19.18 185.40 Pass-Major Risk V-227-V-227-V-227 472.74 450.00 236.86 7.98 228.88 Pass-Major Risk V-229-V-229-V-229 1,292.07 1,275.00 44.22 22.61 22.78 Pass-Major Risk 9/7/2016 10:27:11AM Page 4 of 5 COMPASS 5000.1 Build 81B • • BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan V-08 Project: Prudhoe Bay TVD Reference: V-08 plan©100.95usft(P273 plan) Reference Site: PB V Pad MD Reference: V-08 plan @ 100.95usft(P273 plan) Site Error: 0.00usft North Reference: True Reference Well: Plan V-08 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan V-08 Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: V-08 wp09b Offset TVD Reference: Offset Datum Reference Depths are relative to V-08 plan©100 95usft(P273 plan) Coordinates are relative to:Plan V-08 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.000 W° Grid Convergence at Surface is:0.69° Ladder Plot I I I I I 1600- gi I T ' T�,�� l e iI {'►H1//' ,11.1-!UWiI/I �, t - 1 Al 1 j1 I+j�, j F, �!! 1/ , ' Ii° 1200- ' '!/ �`�/ ► 1 o 11,‘ of I will/ ' ��� u I , o V .ni If I/ ' 1 1 I IR r,1111 r IV" 1� A =.. J J JIlj It 11 IC piff4 1 p � 800- _A1:14# �l11i , ' `�' 1 i 11 j -_ 1 f.1 LE-G-END I } I I f 1 ea I I -29,V 29,V-229`/0 If ' I/r jf/'� ,' V-114 V 114APB1 V-114APB1 V4 --4- V-205,V-205,V-205 V14 c r 'r/1 ', U ° j'/ a ,,k0 ii 1 V 114 V 114A 132 V 114APB2 V2 I -Or V-205 V 205L1 V-205L1 V9 IK JPS 1�AJFST 01 / I V 1 la n V-206(slotV 2 15 V 115,V-115 V5 -9- V-205 V 205L2 V-205L2 V8 lanV-226(SL),Pla .A _ I 15,V-115L1,V-115L1 V2 $ V-207,V-207,V-207V5 -0 I,V-01,V-01 V1 --LAW/X.", g V 115 V 115L2 V 115L2 V4 V-207 V-207L1 V 207L1 V2 Ian V-228(S-S)PI 1 V 1 "� 5 V 115L2PB1,V-115L2PB1 V5 ' V-207 V-207L2 V-207L2V3 -0_,V-02,V-02 d1 cam' I$- V-1 5 V-115PL3'Lfi V-115Pg1 V4 I r' V-207 V17071 3V-2071 3V2 I -03,V-03,V-03 V70 2500 $ \ V-11177,V-11v7 V9z7P5B00v& 10000 'e' V-207j, ' L4,V-207L4 V21 5000 -e- V-207,V-207L4PB1,V-207L4PB1 V6 -06,V-05,V-05V13 $- V-117,V-117PBz V--1177PB2tV62500 usft/in)s -6, V-207,V-207L4PB2,V-207L4PB2 V2 -0 ,v-u/,V-u/vlb -* v-Tly,v-113,V-IItV1b JE- V-Lu/,V-LU(I' 1,V-Lu/1-'1:51 VS -190,v-100,v-wow -9- V-120,V-120,V-120 V6 -4- V-210,V-210,V-210 V9 -101,V-101,V-101 V7 -4- V-121,V-121,V-121 V5 -4- V-212,V-212,V-212 W -102,V-102,V-102 V5 $- V-122,V-122,V-122 V10 $- V-213,V-213,V-213 V5 -103,V-103,V-103 V6 -)E- V-122,V-122PB1,V-122PB1 V10 -E- V-213,V-213PB1,V-213PB1 V5 -104,V-104,V-104V13 -4- V-122,V-122PB2,V-122PB2 V7 -9- V-214,V-214,V-214 V3 -1 t15,V-105,V-105V13 -I- V-123,V-123,V-123 V0 -8- V-214,V-214PB1,V-214PB1 V2 -106,V-106,V-106 V10 -9- V-201,V-201,V-201 V10 -A- V-214,V-214PB2,V-214PB2 V3 -106,V-106A,V-106A V9 -4• V-202,V-202,V-202 V10 - - V-214,V-214PB3,V-214PB3 V5 -106,V-106APB1,V-106APB1 V7 -X-- V-202,V-202L1,V-202L1 V5 -3E- V-214,V-214PB4,V-214PB4V2 -1 Q6,V-106APB2,V-106APB2 V2 -Ar V-202,V-202L2,V-202L2 V5 -a- V-215.V-215,V-215 V7 9/7/2016 10:27:11AM Page 5 of 5 COMPASS 5000,1 Build 81B ■ W • • awl l`WO Northing(750 usft/in) b in 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 m le m 2 2 p_ M r_ p 0 g 2 n a g 2 v2 n 63 r 888888888 m rn rn rn rn rn rn rn w rn rn rn SIJ LO U7 LC) N LO 117 LO l{7 In InlY In In to In to to LO 47 47 47 CV c- 03 CO 599000 N v- csi 0 N 599000 1— N NCNI N cnN N N r N Z j /C > 598500 598500 y/ _ N N W d 598000 > m j 7 N co > I 598000 0_ Q > j N tq 'n j M a 597500 0 N j a_ 597500 €2 E' N LO Q a m o ur 597000 0 r c ■ 0_ o 597000 z t fn t000= o mono '° - r J co m o >@) ,&,.., o 1 > o_ v- 596500 596500 Z - - N o Op a tE c'l } sg z 3> > 596000 7 j M ri .. a ? 1-$_ 596000 8 cy NLO . J co E, 595500 N > > ->'--- 1- - > 595500 aao V 'U) CO N z Z?°3 595000 N o _-_off j N o N 595000 m Z3 o > j r g> g 594500 CN N .c.1 a t t d 594500 0 594000 5k1i N N ca 593500 > •••, Z 593500 -1 .2 593000 \ t ; = • N' o > 593000 N o ur z v 592500 o j N � > n \ 592500 O > p , i Q: tp •" > u p ' m P EEl Ill y 591500 N * \ vI O > -� N c `i �'O 591000 t '�� �� z m s :1590500 0 o�i�i�� > 590500 C o W 590000 0 3 Al �AV.s_ _ Z�/�/ -- 590000 W 589500 > _v v ry 7 . i, 589500 N /, It 5asooa o • M ,j a �1/41 / 1111 I 589000 N O _ O . N 588500 Z r , j N N Q 588500 588000 j N '; o 588000 z J o 587500 - gip \ >' - Z -- - .587500 a. 587000 '�„ �■ ■- n 587000 cv CO 4 586500 2 N 586500 v>1:1->`��0> > o 586000 0 a. > o 2 m__ ■�N=■ 586000 aaaa2 0 a , m 585500 v j ■�■■E■ '` r 585500 3a� o N ,T2 1111 i„ 3 585000 0 0 585000 N 1111111111..111111 _i - R 584500 o .■ �■ 584500 > j 584000 cri ch ■■E 584000 -I a 583500 00 —■■ ■■ 583500 583000 @ — 583000 0_ 582500 582500 a 8 8 8 h 8 N 8 o 8 cq 8 0 8 8 a 8 CV CV //�� U7 Y] 0 In to In 4'1 0 In to In n r n ncncno, r r r r r ,7 n r 8 8 2 2 8 8 S S 8 (u!/usn osk)2u!yloN • • la1 04. 0 A IAS .1 X t18 311 , g � • Oj � hd i 2. aA -g i A . �x ME m I J J , 3r • W a it r_ g w ill ga; gAA lalpq K O m u 6 t .. A !i! ' ,IP i l� a -sfa = a iiiE a ;l ww Ih $gi11111 Y1as= i at 1 d011 I!iflIitiiIi q Ian i63 , (JJ.)Ii33o tlWP33 Stn "'y`" ::;'"7- —../s s-.f ../s i-,z .Ut oI-.0 io' C & $ ,u,s-.z. $ ()eawant I° • 4 08� 1,- E m 0 I En a e LJ I z V } U a L O O u) m _O o O co 0 _ O1E •C Eil � i 0 V-220 0 0O •— /' r D V-2 a�- o .> • lit I- V-227 a. V-1: • V03 (13 01 • w V-2' C V-111 Lo 0) = Cn • V-2 O .� 06 V-117• N- Z m - v U • ' � V-103 r V-212 V-121 • N N V-106 ■ V-217• Nap w V-123 1 V-205• Q V-04 ■ / D' —TD-- 0 V-105i I 4*-- -'..- — • o N V-221 1 • o V-07 • � � � V-223 a. o Q W E1.0 1 • I� U V 222 V-102 ■ V-229 • 07' Q 1 CO 1 V-201 - - I V SK a� V-107 ■ V-SJ - i E V02 ■ • V215 Oi n V-104i - • V-204 o T m O� V-210i / V-114 a , W - LU V-202 • V-119i p' Q CIS V-214 ' --- - ---/ ■ V-109 V-101 • , V-225 —11 V211iA / ■ V-113 -11 - V-108 • I V-05 p3 m V-20� ■� V-112 Q 11 05� I a) 0 051. "I I L 0 O 1 �® I J W y� O coi z co W H I— r ,, d 12 w m W 1 "�� C �G�// i //// ti1b�N' LLI U ■ 8 L _ _ • • 6 a) of) CD 2 ...- 2 D -CI 0 D - O 42 Ci) (I) .E o ib •- C r3) 4-j 0 o co +a E _ 4-1 0 C .1.— O D (1) .> a) a) w• 2r 73 a) 0 P— P— ca- O)N-- 4E' CO 1 C u) a) (N '4= w -c) a) ._ OD ) 4ro o 5 f 1 r— Z c0 ,..J_. c 0 \ S.- I a) -- 4-- V-207 IIII --.,_ 1-1-7 i CU ___ CD 0 .-& I_(3) > a) - -I V-120 .4 - --, 111 ---i i / V-218 4 - - 1 • 41 V-216 11 ' 1,_., V-117 ,. 111111"" • „,..,,„-...„...,, _ :3:, ,- - V-212 4 ---, 1 V-121 o , (N II ' V-21 • r-- cNj co V-123 4 0) 1 k 0) 1 • , _ V-1051 44 CD 44 CC) • V-07 • 4,5 p \ 1 V-223 (ti c 0- o Z C42 , 'I ' 1 V-222 4 > 0 .,- --.= V-102 II LI t...) CO ' V-2-29 • V-SK 'II V-107 111 4 ' aW l'1 C (L) V-SJ -0 4 V-215 V.1041 44I V-204 = 2 1 44 V-114 < , V-202 • , 1 4 v-ligi m , , Parker Elk 272/273 • New Diverter Layout Showing Distance to Ignition Sources in Red . JGS 1-2-2016 20' Exclusion Zone Loader Parking Prohibited Air ___ '1/7 // / .///://4 : 0 : .0. ..... ...., ...,,,Nil ♦ Heaters .0 + ` Utility Modul E:;;I*$: / \ JWJ' (ifi) . sin, /./e,,,/,/. • { • Drill Mo ule ii • I 0' Rig Cellar 75' (Dummy /Well House Y i Rig Floc Cantilever RigN/; ' , New Boilers / ,/ //' ` , r'%i;fr 11 Diverter 1 ./7 -;{; // / ,'/'', ' } Vent Line 7/1// Cellar, BOP Deck { ' �50'-* Rig Floor Are All Classified Areas 0 (No Ignition Sources) . // 7'/ 4 // ud Module ` '' " - '.' ' „/"..07;;3 ,,,,,,//,,,,,,' Air Heater Vac Trucks Note 1 -All ignition sources are outside the 75' radius from the end of the diverter vent line. Boilers are located on a deck 2 levels below the air heaters on the rig. Note 2 -An exclusion zone will be used to keep the loader from parking in the 75' radius around the diverter vent. • Bridge Crane • Permanent � Bracing Rig Drill �C and Saddle Module Rider (Sub Base) Rigs +t 12.1' > < 19.8' 1 6.0' BOP I Knife Valve Deck 20"diverter I 1. Flow T' 1, 4'Spacer 4'Spacer ( 20'Spacer 22.5 deg Angle '' Spool Spool Spool Section 1'Spacer `' I Spool I I s I Dummy I Well House 20"Riser II Conductor / // / / ./. : 18.4' N 4 26.0' > ,--'\------'--------\-----,\— / t 39.0' 0F 11.0' 4 50.0' > Notes Diverter Plan for Well V-08 1 -This diverter vent line configuration is identical in length to previous designs. The only design change is the replacement of the last 6'of vent line with a 22.5 degree angled section. The angle section will be oriented to the left of the rig. (Away in this view)to divert potential flow away from a production manifold building. 2-There is no change in distances to ignition sources. All dimensions remain the same. 3-The production manifold building behind the rig has an electrical classification of Class 1 Div1. There are no ignition sources in the manifold building. • it • P ifi " ow. .' I CD O l() 1s{i RIN (NI .t I O 0 4) U J C � � U Q � jil ' 1 > N a .2 0- z ,, U) J i O U) U) > = O 2 < o••1,-� I • . '40,41-1 PritifiK; tits Alfaikr4411L44. Ofte4004604104 iiiilialgOitia1411 , /16-5coo I 71 : rrTi 7 0, 50CC MOD I VC DV \\AID ow- -/ ) LUJUJI , - 00C VOD ,20 CV MOD 20 ,Dv ,AD D \C+ r717-1 1771[171 PP" III— _• •C$ \ - /16 DOCC MOD CV PRI RATE AND CONFIDENTIAL RE4,10, Sr,l, 0 .444,4 AND 4 4t VU,6.1104[arYTA4E9 1,91,J.4E1,54444 .k V4IXER°R4i'0 MAR3a/ DB DI-. " REE OR,T,REviEvo +1111Clitchnologles o 000 I\ID, .S.CN -41,14_"ON DB 01 GE, =RT c.Fs,rt 494'4,1tOF SH4. 64414 JFELD • — • - .1 'I,16-5000 G2-391 SC'SS '. r--- MI IMI NUM �4q I r T— ._� �olr M. y-- - - --- -�- - " _ ./—ia=1 - 0 _C'._EDOW'N SCRFsvS ,) 0 09 SCSS, -x.' 101 1®i •'� l��� � • %L i7Q,OiI_ 7j' 1S.� 37.78o r.3iz`5 o AS 1"16 (' _2SCr FOR -- — - T L ' 1 —Ltm ID OCK DOW N SCR'F 1,'S 15- t- 5000 'R 588 1 Ip�>f -----lel ,6-5000 VCD 120 CV Ii P 11 :0 : I .. --, 1. ll G i .. 110 I!fI 'll = ' - n i m I T 1y�, O . . � �r7 87 s 1111,, 111 ds If I. V 2A 1 N N,BLI2 1 E,L121�r On _ 13 300 C.30 RT-r 4\D NC 7 N JI a 322 00,92919 S'8 CAS,IMC IANC,,R 3 !F' O7C, r SI °- N nll::INI; .-2\C IPi6 q CASING IAD ASST-.V5:Y II'3 98 - 'J N -+.EAD ASSEMBL, e ,c91 2 7E i96 vv 2SR -- 20'OD CACI 0C, 7 lit ''co ' PAL,<OH r A»EVdL d " 963 � 'RING A CER ASSD V13 ' 9 502 OF. 6 5 L13,NC ,EAG ADAPT=R AS _\IBL, // 'IG 093 7.7 9 .5,B I ;AS v ,ANGER 9 CrB 07 CAS NG PI 31E cii 1 E. 112 3 `I CA J AN'„ 2 :2•_:!12 — JI', LA', NC; G f-- __ ---__ __.a CAS IVG Fri _i 1\'.i\ l\'. - 221391 080(398 y;l _ PRIVATE AND CONFIDENTIAL .1911.7S,.ii E 7999,99 079 SIONS 97.9,-.....90 111J A 1 C E 8IE za o 2R24o fMC r. NOOSE 0 -l. 9999 JO ;CI. .N 5. oMMoti ; MUST d �— 09 �N EIs Well: PBU V-08 <==Data Input g' a Name: V Loepp <==Data Input )' Mud Weight(ppg) 10.60 <==Data Input Weak point or LOT-Measured depth(ft) 2,914' <==Data Input Weak point or LOT True vertical depth(ft) 2,751' <==Data Input Weak point or LOT-Hole angle(deg) 34.0° <_=Data Input Weak point or LOT-Hole size(in) 9.625" <==Data Input Weak point pressure or LOT-EMW(ppg) 13.10 <==Data Input Zone of interest-Measured depth(ft) 10,187' <==Data Input Zone of interest-True vertical depth (ft) 8,759' <==Data Input Zone of interest-Hole angle(deg) 30.0° <==Data Input Zone of interest-Hole size(in) 8.750" <_=Data Input Zone of interest-Pore pressure EMW(ppg) 7.90 <_=Data Input Ilfr Gas gradient(psi/ft) 0.10 <_=Data Input MI ,, Bottom hole assembly OD(in) 8.0" <==Data Input Bottom hole assembly length(ft) 200' <==Data Input Drill pipe OD(in) 5.500" <==Data Input BHA annular vol.@ zone of interest(bbl/ft) 0.0122 DP annular vol. a@ zone of interest (bbl/ft) 0.0450 DP annular vol. weak ••int bbl/ft 0.0606 Additional safety margin(psi) 0.00 <==Data Input Weak point pressure(psi): Pio 1,874 psi Weak point pressure-Safety margin: Pmax 1,874 psi Pmax EMW 13.10 ppg Max anticipated formation pressure(psi): Pf 3,598 ps, Weak Pt to Zone of Interest distance(TVD ft): OH {TVD} 6,008' Weak Pt to Zone of Interest distance(MD ft): OH MD) 7,273' Maximum influx height at the bit (ND ft): H {TVD) 3,518' Maximum influx height at the bit (MD ft): H {MD} 4,062' Calc.volume of{H}around BHA: V1bha 2.4 bbl Calc.volume of{H}around drill pipe: Vldp 173.8 bbl Calc.volume that H equals @ initial shut in: V1 176.2 bbl Calc.vol.that H equals®weak point(MD ft): Vwp 257.2 bbl • Calc.volume of Vwp @ initial shut in: V2 134.0 bbl IMMONIMMENIIIIIIIIIIIIIIIIIIIIIIIS ,, Kick Tolerance: V2 134.0 bbl ii, al ir NOTE: • — • • OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. • • TRANSMITTAL LETTER CHECKLIST WELL NAME: L" PTD: Z76 ' 7/3 v Development Service Exploratory Stratigraphic Test Non-Conventional FIELD: v-4-44: Ltr3 .-- . POOL: 11:-2,14.,e_ �!/ Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: . production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are • also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 • • El,� To 0) a , a) C 0 a) o so To C 0 2 • 'CY om cf a c C 4 •R, C y, - M, 3, c0, 4 'o 0 O x 3 ami a a), =' N , , 4 0-3 , air U, � o o 0 Y tj (n O � -0 N pi 0. O O n ca LL, o, ay co 8 m 0) . Cry y -O y �' Vco IS a aj CY N C O y' N d o', O CO o CO -p 3, u o ami' 0 '0 °, o, o E, > E -�, • U, O E, 6 0 NO �� CO, CO, t0 •C ' Q' LOU).( 0 C, p , 0 co, • 0 0 oY; � oo N ). C 9 , co � , M c COCN ,� o o , , 3 co4 , w oE, N, _, , Z aCv a Y o .o � . I)" 2N, CCO, p, lac:7 O, a• J� J N ,AA �>' dP Q QOoZ. p �� C ) N 0' ,72,-C, W, ,, C O. M y p? OCOO N Cad , 0, ,W ° O. CO 7ya) ca uO . 2, „, r, _E- . o , c , . c. 0.• t9 d. N, �, 0` N G f0 N CA �, a), a) O E) a Q' a) a), 4 p �, o, �. E. N U) �� R Th, 3, 4 0E U ' �' ' 0 LL c, 5, 3, m, v, v, �, N, y, o, N, CO co' °, E, t re' m O ' 0'' �, p, 0' " oM. t0t ' E. aO •.. c 2, co, a LL. 0. 0, U , , °) x' ndC Za ' o, rn - OO �, >, md N. .�x p°). CL, -' ' ce' O o. ' W • C) • Q.• Uo co coN H- LL Q Q 0 2 2 I > 2 a 0 co W , , t D U(1)? N N N N ',Pi 41', '4).), CA N q)' N, CA N 0, 0 U) tl) V) CO N N U) tl) CO CA CO Q a) a), a), a), a), a), a), a), m, a), a), a), Q. Q, Q, Q a), a), a), 0, a), a), a), Q, a), a) a), a), a), a), a), a), Q, o, a), Q, Q, Q a z; >-', >- >- >- >- >- >- >- >- >- }. }, Z, Z' z, Z >- >', >-, Z, >- >- >- Z, >- >- >- >-, >, >- >- >' Z, z >- Z, Z, z >. F w iii asN C. 6N, E E, ; 3 , ,8 °� , I a), U•O . . O. o. co7 E. 0 3 E 3, ° m ; O a),' 07 , , , a°i Z, a co O c >, , C, O, N, a f0, w 2 7 O, c y, f6, p c, 7 LL 3. " o >' f0 0, a o M N, U, y, N a) �, o. N n .. 3' 2' 1. 2 m Qc, a) a, co 'm' `,' >: w' 4 0' o ° o' ers E' ate)' •a •o o M' --00 O' 3' . o ' �' �� CD Zca ' c •oyL,, ay v', e' 3, 711 , Oa>) ` ' (I), o�, , - C, oa°3, p0v),, c' .a. 9a t, QW', N , N Di' Op ' , . 0a , • , fa, Na c am, 0 , 0) a' , c C 0 L: W - NtO 2_ . EE =