Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout198-088•
~RAMK d~. tViURCtOWSCCl, GO!/~RiVOR
333 W T" AVENUE, SUITE t00
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-t 433
FAX 1907) 276-7542
~~BtlL~~S~I,- 9 I®9
AI)VIIYIS'I'i2A`I'I`'E APPR®~AI, iiI®. AI® 3.006
0~~
iVls.:4nna Dube, Well Integrity Coordinator
BP Exploration (Alaska) Inc. (~~
Attn: Well [ntegrity Engineer, PIZB-2=4 ~~~~~~t~~ JAN ~ ~ 20~$
P.O. Box 196612
Anchorage, AK 99~ 19-661
RE: Cancellation of Administrative Appro~~al AIO 03.006 (Well PBU R-ZOA)
Dear 'GIs. Dube:
Pursuant to BPXA's request dated October 10, 2006 AOGCC hereby cancels Administra-
tive Approval AIO 03.006, which allows water injection in well PBU R-20A. This well
exhibited a surface casing leak, and BPXA did not at the time propose repairing the well
to eliminate the problem. The Commission determined that water injection could safely
continue in the well, but subject to a number of restrictive conditions set out in the ad-
ministrative approval.
Since then, BPXA has determined that PBU R-20A's condition has deteriorated to the
point that safe operation is no longer supported. The well will remain shut in for evalua-
tion of repair options. Consequently, :administrative Approva[ AIO 03.006 no longer ap-
plies to operation of this well. Instead, injection in wet( PBU R-20A will be governed by
pro~~isions of the underiving Area Injection Order No. 3.
I)®YE at Anchorage, Alaska and dated ®ct®ber 16, 2006°
The Alaslra ®rl and C~as Conservation oen iss/on
~ ,` _,
~ , -
. _ v .. r -~s jI~/
~'••~~ J.o~n IC~~orman Cathv oerster
,;,~,
~~,~
C~iairrrian Commissioner
1J'
•
~ ~ lam, l ~ ~ __~y
~ t
~ ~ ~. I '~ ~} ~ ~~ ~ ~ ~ ~~
~ ~~~
~
~
~ ~
~ r ~ -
I
) } I I
' ~
~ .
~~ ~
'
~
~' ~J r ~
' ~
~
j ~ ~
~ '~~
~
~
~~ : ~ i 1 ~
te . a-
_.
.z, ~,.
_., ._,
7~~TT~~++ .~L~~~St~~S~~T n®u7~,~A1~cD~+~77T
ADMINISTRATIVE APPROVAL AIO 3.006
i~Ir. Steve Rossberg, Wells tilanager
BP Exploration (Alaska) Inc.
900 East Benson Blvd.
P.O. Box 196612
Anchorage, AK 99519-6612
333 W. T" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
RE: PBU R-20A (PTD 198-088) Request for Administrative Approval
Dear Mr. Rossberg:
In accordance with Rule 9 of Area Injection Order 003.000, the Alaska Oil and Gas Con-
servation Commission ("AOGCC" or "Commission") hereby grants BP Exploration
(Alaska) Inc. ("BPXA")'s request for administrative approval to inject water in the sub-
ject well. The Commission hereby denies BPXA's request for administrative approval to
inject gas in the subject well.
PBU R-20A exhibits surface casing to conductor casing communication with gas leakage
to the atmosphere. AOGCC Finds that BPXA has elected to perform no corrective action
at this time on PBU R-20A. The Commission further finds that, based upon reported re-
sults of BPXA's diagnostic procedures, PBU R-20A exhibits tw•o competent barriers to
release of well pressure. Accordingly, the Commission believes that well operation in
water injection service will not threaten the environment or human safety. However, the
Commission believes that PBU R-20A's condition does not conform to the relatively
more stringent standards of well integrity necessary to ensure safe gas injection.
AOGCC's administrative approval to inject water in PBU R-20A is conditioned upon the
following:
1. BPXA shall record wellhead pressures and injection rate daily;
2. BPXA shall submit to the AOGCC a monthly report of well pressures and injec-
tionrates;
3. BPXA shall perform an annual I/IIT - IA to 1.2 times the maximum anticipated
well pressure;
4. BPXA shall limit the well's IA pressure to 1000 psi;
FRANK H. MURKOWSKI, GOVERNOR
Mr. Steve Rossberg
January 27, 2006
Fage 2 of 2
•
~. BPXA shall immediately shut in the well and notify the AOGCC if there is any
change in the well's mechanical condition; and
6. after well shut in due to a change in the well's mechanical condition, AOGCC ap-
proval shall be required to restart injection.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such
further time as the Commission grants for good cause shown, a person affected by it may
file with the Commission an application for rehearing. A request for rehearing is consid-
ered timely if it is received by 4:30 PM on the 23rd day following the date of this letter,
or the next working day if the 23rd day falls on a holiday or wreekend. A person may not
appeal a Commission decision to Superior Court unless rehearing has been requested.
DONE at Anchorage, Alaska and dated January 27, 2006.
Cathy . Foerster
Comm ssioner
Daniel T. Seamount, Jr.
Commissioner
~~~0~~
s ~`~`- .~
~~
* ~ ~ / ~ ~ ~.
\ ( ! ~~ J y
,~ ;;
~,
:~
y ~; ~,
~' ~'
,.. -
Well R-20 (PTD #1980880) Classified as Tnl- Cancel waiver
.
All,
The waiver for well R-20 has been cancelled. The waiver process relating to wells with surface casing
leaks has been reviewed and the finding is that GPB will no longer waiver these types of wells.
«"LV A
Lead Operator: Will you please ensure any waiver related signage is removed from the wellhouse.
Please call with any questions.
Andrea Hughes
(Filling in for Joe Anders)
Well Integrity Engineer
Office: (907) 659-5102
Pager: (907) 659-5100 x1154
QP4...u.u=r~ ~r; \j; f) P
"""",na"!,;~~' ,)I;.. r 1" ;:¡
1 of I
9/25/2006 10:51 AM
· STATE OF ALASKA '\ JAN 2 6 7006
ALA~ ) OIL AND GAS CONSERVATION COMtv.BION
REPORT OF SUNDRY WELL OPERATIONS Alaska Oil & Gas Cons. Commissiol1
Stimulate D Other 0 ~ilMmdry
WaiverD Time Extension 0
Re-enter Suspended Well D
5. Permit to Drill Number:
198-0880
II~ 6. API Number:
50-029-20641-01-00
9. Well Name and Number:
1. Operations Abandon 0 Repair Well D
Performed: Alter Casing 0 Pull Tubing D
Change Approved Program 0 Ope rat. Shutdown D
2. Operator BP Exploration (Alaska), Inc.
Name:
P.O. Box 196612
Anchorage, AK 99519-6612
7. KB Elevation (ft):
3. Address:
49.77 KB
8. Property Designation:
ADL-028257
11. Present Well Condition Summary:
Total Depth
measured 16885
true vertical 8914.21
Effective Depth
measured 16864
true vertical 8914.62
Casing
Conductor
Surface
Production
Liner
Liner
Length
80
2699
11277
557
3682
Size
20" 91 .5# H-40
13-3/8" 72# L-80
9-5/8" 47# L-80
7" 26# L-80
4-1/2" 12.6# L-80
Perforation depth:
Measured depth: Open Hole
True Vertical depth: Open Hole
Tubing: (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13.
Oil-Bbl
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of Logs and Surveys Run
Daily Report of Well Operations
· ,...""..... V L. LJ
Plug Perforations D
Perforate New Pool D
Perforate 0
4. Current Well Class:
Development
Stratigraphic Ir
Exploratory
Service
R-20A
10. Field/Pool(s):
Prudhoe Bay Field/ Prudhoe Bay Oil Pool
feet
feet
Plugs (measured)
Junk (measured)
None
None
feet
feet
5'CANNED ~JAN ~1' 120Gb
MD
23 - 103
22 - 2721
21 - 11298
1 0812 - 11369
11089 - 14771
TVD
23 - 1 03
22 - 2708.79
21 - 8642.74
8277.93 - 8698.83
8481.07 - 8968.69
Burst
1490
4930
6870
7240
8440
Collapse
470
2670
4760
5410
7500
4-1/2" 12-6#
L-80
19 - 111 06
9-5/8" DV Packer
4-1/2" Baker S-3 Perm Packer
4-1/2" Baker ZXP Packer
4-1/2" Baker ECP Packer
2588
11050
11 089
14670
RBDMS 8Ft .IAN 2 6) 1006
Representative Daily Average Production or Injection Data
Gas-Mcf Water-Bbl Casing Pressure
639 40
Tubing pressure
2200
15. Well Class after proposed work:
Exploratory I Development I
16. Well Status after proposed work:
Oilr Gas I WAG I GINJ I
Service ~
WINJ p- WDSPL I
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
IJ~
ORIGINAl
Contact Anna Dube
Printed Name Anna Dube
./
Signature.... ()<.. AM...J-cL(
Form 1 0-404 Revised 04/2004
Sundry Number or N/A if C.O. Exempt:
304-243
Title Well Integrity Coordinator
Phone 659-5102
Date 1/19/2006
Submit Original Only
MEMORANDUM
TO:
Jin.,. Reoa ,-o:-ïK,· ~.~
bb . ~ ì . O(p
P.I. Supervisor tit¡, ,
FROM:
Jeff Jones
Petroleum Inspector
Well Name: PRUDHOE BAY UNIT R-20A
Insp N urn: mitJJ060 104081545
Rei Insp Num
Packer
----,--- ._,.__....,--.'_.,-_.,...,~,,-,-.... -- ~"--
Well R-20A Type Inj. TVD
P.T. 1980880 TypeTest SPT Test
.' ... ,...."'-....,,.--,--..-...-.......
_JºJ~rYªL._~_~9~~~~.,_. "..,.,J>.rf.
p
.. ·___H~.."__..,~_,·_··__·_,_._ "__~_'_'___"_..,~.,." ~ _." .".....
Depth Pretest Initial 15 ,Min. 30 Min. 45 Min. 60 Min.
..~.,~." ...,--......".-...".-.-.
8452 IA 220 2990 2960 2930 2920
2113 OA 0 0 0
Tubing 1860 1880 1900 1855 1790
)
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Wednesday, January 04,2006
SlIBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
R-20A
PRUDHOE BAY UNIT R-2OA
Src: Inspector
NON-CONFIDENTIAL
API. Well Number 50-029-20641-01-00
Permit Number: 198-088-0
Notes Sundry #304-243. 6.8 BBLS methanol pumped. 1 well house inspected; no exceptions noted.
.._____._."___.,_,,_...__ '·'4"_""'~·'..'" ,_ ,..".",.._ ."~_" .,,,,.,,.,,._...,,.,.,....__,. ..__,__.__,__,...,.,._..__.___... .._._,_.__.~ "'"'.''''.''' .".
Wedncsday, January 04, 2006
.\ ~,i'\M 1120Gb
~ç'ì~NEt· ~J!"~~~ ." ...
)
6Q;-'Oqfb
\ Reviewed By:
P.l. Suprv -'Jfl2-.
Comm
Inspector Name: Jeff Jones
Inspection Date: 1/2/2006
Page 1 of 1
"fREE :::'
WELLHEAD =
ACTUATOR =
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum Tv'D =
6" McEVOY
Mc EV OY
OTIS
48.71'
25.75'
2325'
95 @ 14119'
11573'
8800' SS
)
13-3/8" CSG, 72#, L-80, ID= 12.347" 1-1 2721'
Minimum ID = 2.20" @ 15044'
RESTRICTION LOGGED 01/10/01
TOPOF7" LNR 1-1 10812'
[ TOP OF 4-1/2" LNR l-i 11089'
4-1/2" TBG, 12.6#, L-80 BTRS, -i 11106'
0.0152 bpf, 10 = 3.958"
R-20A
SAFr . ~OTES: ***SURFACE CSG x CONDUCTOR LEAK
OPERA ('ING LIMITS: MAX lAP = 2000 PSI, MAX OAP =
100 PSI (08/28/04 WAIVER)*** RESTRICTION @15044' -
COULDN'T PASS 2.20" CT NOZZLE, 01/10/01 - OH
COM PLETION . 700 @ 11809' & 900 @ 12126'
Þ I
::)---j
"
JI
2053' 1-i4-1/2" HES X NIP, ID = 3.813" I
2588' I-{ 13-3/8" X 9-5/8" DV PKR I
I ,
GAS LIFT MANDRELS
Tv' 0 DEV TY PE V L V LATCH PORT DA TE
ST MD
11
J f I 11039' 1-14-1/2"HESXNIP,ID=3.813" 1
Z z ~ 11050' 1-17" x 4-1/2" BKR S-3 PKR, ID = 3.875" I
~ 11073' 1-14-1/2"HESXNIP,ID=3.813" I
ì
...
Z
9-5/8" CSG, 47#, L-80 BTRS, 10 = 8.681" 1-1 11298' ~
EZSV l-i 11390'
TOC l-i 11480'
7" LNR, 26#, L-80 1J4S, .0383 bpf, 10 = 6.276" 1---1 12187'
ÆRFORA TION SUMMARY
REF LOG: GR / RES ON 07/3/98
ANGLEATTOPPERF: 91 @ 14771'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
6" 14771 - 16864 OÆN HOLE 07/21/98
¡'
DATE
1981
07/21/98
04/02/02
12/13/04
REV BY COMMENTS
ORIGINAL COM PLETION
MWL SIDETRACK COMPLETION
RNITP CORRECTIONS
RDJ/TLH WANER SAFETY NOTE
DATE
1
I~
11094' 1-14-1/2" HES XN NIP, ID::: 3.725" 1
I ~ 11089' l-i BKR ZXP PKR, ID = 4.735" w /SKR HMC LNR, HGR
I 11106' 1-14-1/2" WLEG I
I 11106' 1-1 ELMD TT LOGGED 07/28/98
'"
:&
~
7" MILLOUT WINDOW
11369' - 1 '1378'
14670' l-t SKR ECP PKR, ID = 4.0" I
16864'\6" OPEN HOLE TD I
;ì
"
~_ I
---~_.I
14-1/2" LNR, 12.6#, L-80,IBT, .0152 bpf, ID = 3.958" 1---1 14771' I
REV BY
COMMENTS
PRUDHOE SA Y UNIT
WELL: R-20A
ÆRMIT No: 1980880
API No: 50-029-20641-01
SEC 32, T12N, R13E
BP Exploration (Alaska)
BP Exploration (Alaska) Inc.
Post Office Box 196612
PRB-20
Anchorage, Alaska 99519-6612
O:,.~".,"",...b.P
~!iJL- "'~I.
~ , "
','. ''I
June 18, 2004
Mr. Winton Aubert, P.E.
Alaska Oil & Gas Conservation Commission
333 W. ¡th Ave.
Anchorage, Alaska 99501
R í\"'"'" (' E ,\¡ ! [f""" ~.r')
. m---" b ¡\\ II ",".' ,I,'
t;l .~,~ ,\" ~ "I,,~
- ~ .ur4'1> ".~v.~,t \,,! ":'.I'..^-".l..:!"-,,,.J
JUN 2 3 1004
þ,~gs;k~~, o¡¡ D
Subject:
R-20A (PTD 1980880)
Application for Sundry Approval to Continue Injection with Surface Casing
Leak
Dear Mr. Aubert:
Attached is Application for Sundry Approval form 10-403 for well R-20A (PTD 1980880).
The purpose of this request is to continue water injection into R-20A with a surface
casing leak.
If you require any additional information or clarification, please contact Anna Dube or
Joe Anders at (907) 659-5102.
Sincer,. cer y, /1 J
~ Ç1~(~
Anna Dube
Well Integrity Coordinator
Attachments
Application for Sundry form 10-403
Description Summary of Proposal
Wellbore Schematic
rre.r'1 '~\ '~: I! r\ I'
ov ç(uj 1-
i ~' ~/JGA- &r¿CZl~,
, STATE OF ALASKA Ie ~,..( r:c:::. \\.,/
ALASKA OIL AND GAS CONSERVATION COMMISSION JUN 2 3 '2\)04
APPLICATION FORSUNDRY APPROVAL' - .
20 MC 25.280
1. Type of Request:
Abandon 0
Alter Casing 0
Change Approved Program D
2. Operator
Name:
Suspend 0
Repair Well 0
Pull Tubing D
BP Exploration (Alaska), Inc.
3. Address: P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
49.77 KB
8. Property Designation:
ADL-0028257
11.
Total Depth MD (ft): ¡Total Depth TVD (ft):
16885 8914.2
Casing Length
Conductor 80
Liner 558
LI ner 3682
Production 11276
Surtace 2698
I'
Perforation Depth MD (ft):
Open Hole Completion
Packers and SSSV Type:
4-1/2" Baker ECP Packer
4-1/2" Baker S-3 Perm Packer
4-1/2" Baker ZXP Packer
9-5/8" DV Packer
12. Attachments: Description Summary of Proposal 0
20" 91.5# H-40
7" 26# L-80
4-1/2" 12.6# L-80
9-5/8" 47# L-80
13-3/8" 72# L-80
Perforation Depth TVD (ft):
Open Hole Completion
Detailed Operations Program 0
BOP Sketch 0
Operation Shutdown D
Plug Perforations D
Perforate New Pool D
4. Current Well Class:
.""IL
PerforateD WaiverŒJ Annular Disposal 0
StimulateD Time ExtensionD OtherD
Re-enter Suspended WellO
5. Permit to Drill Number:
198-0880
top bottom top
23 - 103
10811 - 11369
11089 - 14771
21 - 11297
22 - 2720
Tubing Size:
4.5 " 12.6 #
Packers and SSSV MD (ft):
23.0
8277.2
8481.1
21.0
22.0
ExploratoryD
13. Well Class after proposed work:
14. Estimated Date for
Commencing Operation:
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Development D Exploratory D
StratigraphicD Service Œ]
9. Well Name and Number:
R-20A
10. Field/Pool(s):
Prudhoe Bay Field / Prudhoe Oil Pool
PRESENT WELL CONDITION SUMMARY
I Effective Depth MD (ft): I Effective Depth TVD (ft):
16864 8864.9
S~ MD WD
July 2, 2004
Date:
15. Well Status after proposed work:
Oil D GasD
WAG D GINJD
Title
/) I Phone
An Dube ~
c:I Á -lA r J". Commission Use Only
Printed Name
Signature
Contact
6. API Number
50-029-20641-01-00
Plugs (md): Junk (md):
None None
Burst Collapse
bottom
103.0
8698.8
8968.7
8642.0
2707.8
Tubing Grade:
L-80
1490
7240
8430
6870
4930
Tubing MD (ft):
19
470
5410
7500
4760
2670
11099
14700
11043
11096
2587
DevelopmentD
Service ŒJ
PluggedD AbandonedO
WINJŒ) WDSPLD
Prepared by Garry Catron 564-4657.
Joe Anders/Anna Dube
Well Integrity Coordinator
659-5102 6/18/04
I Sundry NU3~:y'. ¡;;. <f.3
Conditions of approval: Notify Commission so that a representative may witness
;""" "
30PlTestD ! Mec~anciallntegri~.y Test ~r:. L~Qatior CI~. aranc~ O.J:- . -L, . .l
-u -k, fA.,1 I ~t eA.-.J:i ~ ¡,~~/U (.(.<1 Va-v tt? t, ~ ~l !.-(/ ¿'-''ll!L ti~ '//1 .
.1 - A '€tI e-. 1.J f £,{,.t.,O vjl2C¿f <. , 11 YG if Cv ( e~¡1J )"l.ëS ~ jZß 12[!)O~ ,
Form 10-403 Revised 12/2003
8fl
~YðJ0
JUN 2 ~ '~~,h
BY ORDER OF
THE COMMISSION Date:
r.. )... D, ~ r,'. ""\ '.,' f\ í f., f
i ¡: '1~ ¡ / h. r \
SUBMIT IN DUPLICATE
R-20A
Description Summary of Proposal
06/18/04
Problem: Injector with Suñace Casing leak
Well History and Status
Well R-20A (PTD 1980880) is a water injector with a surface casing leak. Summary of
recent events:
> OS/26/04: MITOA w/ N2 Failed, leak to conductor @ 100 psi.
> OS/27/04: MITIA Passed to 2500 psi.
This sundry request is to allow for continued water injection. The following supports the
request:
- A MITIA Passed to 2500 psi on OS/27/04, demonstrating competent tubing and
production casing.
- Pressures, temperature and injection rate are monitored and recorded daily.
Proposed Action Plan
1. Allow well to continue water injection.
2. Record wellhead pressures, temperature, and injection rate daily.
3. Submit a monthly report of daily pressures, temperatures, and injection rates.
4. Perform an MITIA once every 2 years.
5. Notify the AOGCC of any indication of leaks or sustained fluids leaking from around
the well.
{
TREE =
WB..LHEAD =
A CfU6. TOR =
KB. aEV =
BF. aEV =
KOP=
Max Ange =
Datum MD =
Datum TVD =
6" M::EVOY
M::EVOY
OTIS
48.71'
25.75
2325
95@14119'
11573'
8800' SS
13-3/8" CSG, 72#, L-BO,ID = 12.347' H 2721'
Minimum 10 = 2.20" @ 15044'
RESTRICTON LOGGE D 01/1 % 1
(
R-20A
~
SAÆTY NOTES: RESTRICTION NOTED AT 15044' -
COl1.DN'T PASS A 2.20" CT NOZZLE, 0111 0101 . OPEN
OOLE COMPLETION -7f1J @ 11809' & 90° @ 12126'
-
-
1 2053' H 4-1/2" HES X NIP, ID = 3.81 3" 1
=>----i 2588' H 13-3/8" X 9-518" OJ R<R 1
~
~
Gð. S LIFT MA. f\DRELS
ST fvD lVD œv TYPE VLV LATCH FORT DATE
ITOPOF7" LNR H 10812' r--.
I TOP OF 4-1/2" LNR 1-1 11089'
\4-112" lBG. 12.6#, L-80 BTRS, H 11106'
0.0152 bpf, ID = 3.958" I '
I 9-5/8" CSG, 47#, L-BO BTRS, ID = 8.681" 1-1 11298' ---ÂI
1 EZSV H 11390'
I TOC 1-1 11480'
1 7" LNR, 26#, L-80 I.14S, 0.0383 bpf, ID = 6.276" 1-1 12187'
PERFORATION SUMv1ARY
REF LOG: GR / RES ON 07/3/98
ANGLE AT TOP ÆRF: 91 @ 14771'
Note: Refer to Production DB for historcal perf data
SIZE SIT INTERVAL OpnlSqz DATE
6" 14771 - 16864 OÆN HOLE 07/21/98
DATE
1981
07/21/98
01/23/01
01/31/01
04/02/02
00 Mv1ENfS
ORIGINAL OOrvPLEIlON
MWL SIDErRACK COMA-EllON
SIS-QAA OONVERTED TO 0\ NVAS
SIS-LG REVISION
RN'TP OORRECTIONS
REV BY
)l\ TE RBI BY
..
~ 1 11039' H4-1/2"I-ESX NIP, D =3.813" 1
8' 8' I 11050' H7' X 4-1/2" BKRS-3 R<R, ID =3.875' I
~ 1 11073' H4-1/2" I-ESX NIP, D =3.813" I
t 11094' 1.,4-1/2" I-ESXNNIP, ID= 3.725" 1
1
g
J
g
I 11089' HBKRZXP R<R,ID = 4.735" w/BKR Hv1C LNR, l-GR I
1 11106' 1-I4-1I2"WLEGI
1 11106' 1-iB..fvDTTLOGGED07/28/98 I
~
.7" MLLOUT WINDOW
11369' - 11378'
I 14670' H BKR ECY R<R, ID = 4.0" I
14-1/2" LNR, 12.6#, L-80,IBT, .0152 bpf, ID = 3.958" H 14771' 1
COMv1ENTS
ffilDHOE SA Y UNIT
WB..L: R-20A
PERMIT No: 198-0880
A PI No: 50-029-20641-01
SEC 32, T12N, R13E
BP exploration (Alaska)
MIT PBU R-20A 05-27-04
'ftb 11ß-03ß
Subject:MIT PBU R-20A 05-27-04
From: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com>
Date: Sun, 30 May 200408:23:17 -0800
T{):"'f\:()QC@.,.,'~:'Wil1t()nA;øbert(E~tnaiI1"<Wirîton~aubert@adtp.in~stilte;~~11S;>;'A.Ø6€(3'B()b' " " ' 'j',
F!éc1fé*st~~n':,(FJ:-ma~l),'t~bQb---f1~cK~iist~i1t@~âiiiiri.state.'å.k.us?~..'",nÃ.<?,~,C"',~.'.Jìni;'R.egg.",(Ê"11Îåil)"". ,~<~:'"
<è~,~~~.øns~!~, ' "," ìsôr<"'.:<]Ñ'S"{JAi) f, "..,".:.: ¡, rà.ûoRSS "', 'sèr' '. . ]3jR~èomt """"l "'. . ¡æ . " , .
~~n' ," "
~(Bå:~ø11. ,."""' '~Ð
Hello Jim, Winton & Bob.
Attached is an MIT form for R-20A, the MITIA passed. The well has a surface casing
leak and is being evaluated for a sundry.
Please call if you have any questions.
Joe Anders, P.E.
Well Integrity Coordinator, BP Exploration, (Alaska) Inc.
Work: (907) 659-5102
Mobile : ( 907 ) 943 - 1154
Pager: (907) 659-5100, xl154
Email: NSUADWWellInte~lr:ì.tyEn9ineer@bp.com
«MIT PBU R-20 05-27-04.xls»
MIT PBU R-20
Content-Description: MIT PBU R-20 05-27-04.xls
Content-Type: applicationlvnd.ms-excel
Content-Encoding: base64
SCANNED JUN 0 9 2004.
1 of 1
6/1/2004 9:50 AM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
Email to:Winton_Aubert@admin.state.ak.us;Bob_Fleckenstein@admin.state.ak.us;Jim_Regg@admin.state.ak.us
OPERATOR:
FIELD I UNIT I PAD:
DATE:
OPERATOR REP:
AOGCC REP:
BP Exploration (Alaska) Inc.
Prudhoe Bay / PBU / R Pad
OS/27/04
Donald Reeves
Packer Depth Pretest Initial 15 Min. 30 Min.
Well I R-20A I Type Inj. Is TVD I 8,452' TUbingl 1,1201 1,1201 1,1201 1,12011nterval 0
P.T.D. 1980880 Type test P Test psi 2,500 Casing 0 2,500 2,500 2,500 P/F P
Notes: MITIA to 2500 psi to eval production casing integrity for surface casing leak sundry.
weill I Type Inj. I I TVD I I TUb~ngl I I I Ilnterval
P.T.D. Type test Test psi Casing P/F
Notes:
weill I Type Inj'l I TVD I I TUb~ngl I I I I Interval I
P.T.D. Type test Test psi Casing P/F
Notes:
weill I Type Inj'l I TVD I I TUb~ngl I I I I Interval I
P.T.D. Type test Test psi Casing P/F
Notes:
weill I Type Inj'l I TVD I I TUb~ngl I I I Ilnterval
P.T.D. Type test Test psi Casing P/F
Notes:
Test Details:
TYPE INJ Codes
F = Fresh Water Inj
G = Gas Inj
S = Salt Water Inj
N = Not Injecting
TYPE TEST Codes
M = Annulus Monitoring
P = Standard Pressure Test
R = Internal Radioactive Tracer Survey
A = Temperature Anomaly Survey
D = Differential Temperature Test
INTERVAL Codes
I = Initial Test
4 = Four Year Cycle
V = Required by Variance
T = Test during Workover
0 = Other (describe in notes)
SCANNED JUN 0 9 2004
MIT Report Form
Revised: 06/19/02
MIT PBU R-20 05-27-04-1.xls
i' STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
,1. Operations Performed:
Abanon["'] Suspend['"] Operation Shutdown[-] Perforate[~ Variancer-'] Annuar Disposal[--]
After Casin~lr-I Repair Well[--] Plu~ Perforations[-] Stimulate[] Time Extensionl-'] Other[]
Change Approved ProgramJ~ Pull mubing[~ Perforate New Poolr-] Re-enter Suspended Well[--] FCO / SBG
2. Operator 4. Current Well Class: 5. Permit to Drill Number:
Name: BP Exploration (Alaska), Inc. Developement ['"] Exploratory[-~ 198-088
3. Address: P.O. Box 196612 6. APl Number
Anchorage, Ak 99519-6612 Stratigraphicr'-~ Service[] 50-029-20641-01-00
7. KB Elevation (ft): 9. Well Name and Number:
49.00 R-20A
8. Property Designation: 10. Field/Pool(s):
ADL 028257 Prudhoe Bay Field / Prudhoe Bay Oil Pool
11. Present Well Condition Summary:
Total Depth measured 16885 feet
true vertical 8914 feet Plugs (measured)
Effective Depth measured 15027 feet Junk (measured) Tagged TD @ 15027' (05/06/2003)
true vertical 8959 feet
Casing Length Size MD TVD Burst Collapse
Conductor 110' 20" 133' 133' 40K 520
Surface 2698' 13-3/8" 2721' 2721' 80K 2670
Intermediate 11275' 9-5/8" 11298' 8643' 80K 4760
Liner 540' 7" 10829'-11369' 8290'-8699' 80K_
Sidetrack Liner 3682' 4-1/2" 11089'-14771' 8481'-8969' 8(~EC
Perforation depth: Measured depth: 6" Open Hole Completion 14771'-16864'.JUN 1, $ 2003
. ·
True vertical depth: 6" Open Hole Completion 8969'-8915'. A~chora~e
Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 TBG @ 11050'. 4-1/2" L-80 TBG Tail @ 11106'.
Packers & SSSV (type & measured depth) 7" x 4-1/2" BKR S-3 PKR @ 11050', 7" x 4-1/2" BKR ZXP PKR w/HMC
LNR HNGR @ 11089'. 4-1/2" HES 'X' NIP @ 2053'.
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13 Representative Daily Ave.raRe. Production or Inie. ction Data
OiI-Bbl Gas-Mcf Water-Bbl .,Casing Pressure Tubing Pressure
Prior to well operation: 23 2026
Subsequent to operation: 1000 1725
14. Attachments: 15. Well Class after proposed work:
Exploratory[--] Development[~ Service~
Copies of Logs and Surveys run _ 16. Well Status after proposed work:
oilr--~ Gas["'~ WAG~I GINJE~ WINJE-~ WDSPL[--~
Daily Report of Well Operations _X
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ISundry Number or N/A if C.O. Exempt:
Contact DeWayne R. Schnorr I N/A
Printed Name DeWayne R. Schnorr Title Techical Assistant
Signature ~~~ ~~~ I~hxe~ 907) 564-5174 Date .May 30, 2003
¢, ........ t ........ ' ,.~;~,r~ I r-I k '
Form 10-404 Revised 2/2003
R-20A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
11/26/2002
O5/O6/2O03
O5/28/2OO3
DR]~FT/TAG (RATE)' DR]:FT/TAG
F]:LL CLEAN OUT.' F]:LL CLEAN OUT
ANN-COMM (AC-EVAL AND REPA]:R)' AC-FLUTD LEVEL
EVENT SUMMARY
11/26/02
DRIFT W/3.50 CENT & SAMPLE BAILER TO 11,938'SLM. NO ELM FOR
CORRECTION. BAILER EMPTY. TURN WELL OVER TO DSO, WELL TO BE PUT
BACK ON INJECTION.
05/06/O3
CTU #5 FCO. RIH WITH 2 1/8" DJN. JET GOING IN HOLE TAKING RETURNS TO
r-19. DID NOT SEE ANY FILL. AT 14,700' CUT RATE TO 0.5 BPM. RAN INTO
THE OPEN HOLE SECTION GETTING FREQUENT WEIGHT CHECKS AND
TAGGED UP 15,035' CTMD. PUH WHILE PUMPING GET AT SURFACE.
PULLED TO 14,750' NOT SEEING ANY OVER PULLS. START RUNNING BACK
IN THE HOLE AND TAGGED UP AT 14,850'. PUH WITH UP TO 5K OVER PULLS
AND STUCK AT 14,470'. HAD TO PUMP DOWN BACKSIDE TO GET FREE. NOT
ABLE TO GET BELOW 14,760' AGAIN. PUMPED 20 BBLS GEL SWEEP AT
CIRCULATE BOTTOMS UP. RBIH INJECTING AT 1 BPM, 1580 PSI. ABLE TO
GET BACK DOWN TO 15,027', APPEARED TO BE PUSHING SOMETHING
AHEAD OF US FOR THE LAST 50'. PUH TO END OF LINER AND CIRCULATE
SCHMOO BE GONE TO THE NOZZLE. JET SBG TO 15,027'. START PUMPING
@ 1.3 BPM @ 2K AND REDUCE PUMP RATE TO 0.5 BPM ON THE UP PASS.
POOH. NOTIFY OPERATOR TO WAIT ON SBG AND POI. <<< JOB
COMPLETED >>>
05/28/03 T/I/O=1700/0/100. TBG FL For FO. TBG FL@ 1062'. FO NOTIFIED OF FL.
FLUIDS PUMPED
BBLS
2 METHANOL
47 50/50 METHANOL WATER
678 SLICK 1% KCL WATER
47 GEL
130 SCHMOO-B-GONE
9O4 TOTAL
Page I
._
TREE= 6'' McEVOY SAFETY NOTES: RESTRICTION NOTEDAT 15044' -
R 20A
~A~T~ ~ ......... O~iS' w COLLDN'T PASS A 2.20" CT NOZZLE, 01/10/01 - OPEN
'~§i"~ ~' ....................... ~'§~'~' HOLE COMPLETION - 70' @ 11809' & 90° @ 12126'
25.75'
KOP= 2325, I I t 208*'
M~Angb= 95@14119'
m -~J 2,~88' 13-3/8" X 9-5/8" DV PKR
I
,
I 13'3/8" CSG' 72#' L-80' ID = 12'347" H 2721' GAS LIFT MANDRELS
I
ST IVE) ' '[VD DEV TYPE ~VLV LATCHI PORT DATE I
~ I
Minimum ID = 2.20" @ 15044' ,
;
' i
RESTRICTION LOGGED 01/10/01
I
I
I~-o~o~..,-~,~H .~o8.~. I--,~
I
,
I I----t .o,~' I-I~-~".~x~,~.~=~.~"l
~ g- ----~ 11o~o'
I ,
I
I
0.0152bpf, ID=3.958" ~ I' J 11106' J--IELMDTrLOGGED07/28/98 J
I
i
I
i
, .7" MILLOUT WINDOW
I 9-SIS"CSG, 47#,L-80BT~S, ID=8.681" I'--[ 11208' . ~1, · 113~9'-1'1378'
15,_ "" '"
I TOC 1148O'
7" L~R, 2e#, L-a0 U4S, 0.0383 ~p~, ~D = e. 27e" H 12187'
REFPERFORATIONLog: GR / REsSUMMARYoN 07/3/98 i '
ANGLE AT TOP PEP, F: 91 @ 14771'
Note: i~fer to Production DB for histork:al perf data
i SIZE I S~ ~NT~VAL Opn~S~. DATE 14-1/2"L~R ~2.e#, t.-80,1BT,.0152bpf,,ID= 3.958" I'~ 14771'
~" 14771 - ~864 OPENHOLE 07121198
~ DAlE REV BY COMMEIX~I'S IN~'I'E REV BY ' ~OMMI~TS PRUDHOE B~¥ UNrI'
I 1981 ORIGINAL CO~vPLETION WB_L: R~20A
07/21/98 MWL SIDETRACK COMFLETION PERMIT No: 198-0880
01/23/01 SIS-QAA CONVERTED TO CANVAS APINo: 50-029~20641-01
01/31/01 SIS-LG REVISION SEC 32,T12N, R13E
,
04/02/02 RN/TP CORRECTIONS BP Exploration (Alas k a)
,
ST rv~ 3VD DEV TYPE ~VLV LATCHI PORT DATE
SIZE SPF INTERVAL Op rVScF. DATE
6" 14771 - 16864 OPENHOLE 07/21/98
DATE REV BY COMMENTS DATE REV BY I ~O~
1981 ORIGINAL COM:)LETION
07/21/98 MWL SIDETRACK COMFL ETLON
01/23/01 SIS-QAA CONVERTED TO CANVAS
01/31/01 SIS-LG REVISION
04/02/02 RN/TP CORRECTIONS
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
THRU: Tom MaUnder ~/'~ ,~
P.,. Supe~v~o~-~ ~(~
TO: Cammy O Taylor tr)~ DATE: July 24, 2002
Chairman
SUBJECT: Mechanical Integrity Tests
BPX
R Pad :~ ~
PBU
FROM: Chuck Scheve Prudhoe Bay
Petroleum Inspector
NON- CONFIDENTIAL
~ WellI
P.T.D.I
Notes:
WellI
., P-T.D.I
Notes:
WellI
P.T.D.I
Notes:
WellI
P.T.D,I
Notes:
Notes:
R-05A
197-250
Packer Depth Pretest Initial 15 Min. 30 Min.
I~,nj.I ~ I T,v.~.I~ I T~,~I ~0~0 I~o~0 I~0~0 I~0~0 I,~,~,1 4
TypetestI P 'lTestpsiI 2033 I Casi,gl 0 I 2340 I 2340 I 23401 P/F I P
R-~OA I'~¥,~,.~.1 ~ I ¥.V.~. I ,~.,,~ I~'~,,~,., I ~.,00 I ~',00 11400 I ~',00 I,,~te,'va, I 4
198-088 ITypetestl P ITestpsi[ 21t3 I CasingI 0 I 2250 I 2250 I 2250 .[ P/F I 13
183-128 ITypetestl P ITestpsiJ 1800 I Casin91 140 I 2t80 }215o I 2140, I .P,'F I 13
197-230 ITypetestl P ITestpsiJ 2096 }CasingJ 60 I 2280 J 2280 I 2280 J P/F J __P
Type Inj. !
Type INJ. Fluid Codes
F = FRESH WATER INJ.
G = GAS IN J.
S = SALT WATER INJ.
N = NOT INJECTING
Type Test
M= Annulus Monitoring
P= Standard Pressure Test
R= Internal Radioactive Tracer Survey
A= Temperature Anomaly Survey
D= Differential Temperature Test
Interval
I= Initial Test
4= Four Year Cycle
V= Required by Variance
W-- Test during Workover
O= Other (describe in notes)
Test's Details
I traveled to BPXs R Pad and witnessed the 4-year MIT on wells R-05A, R-20A, R-22 and R-25A. The pretest tubing
and casing pressures were observed and found to be stable. The standard annulus pressure test was then performed with
all 4 wells demonstrating good mechanical integrity.
M.I.T.'s performed: _4
Attachments:
Number of Failures: _0
Total Time during tests: 4
cc__.~:
MIT report form
5/12/00 L.G. MIT PBU R Pad 7-24-02 CS.xls 7/31/2002
'-,, .~l STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _X Plugging_ Perforate_
SCMOO-B-GONE Pull tubing _ Alter casing _ Repair well _ Other_
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet)
BP Exploration (Alaska), Inc. Development__ RKB 49 feet
3. Address Explorato~__ 7. Unit or Property name
P. O. Box 196612 Stratigraphic__
Anchorage, AK 99519-6612 Service__X Prudhoe Bay Unit
4. Location of well at surface 8. Well number
3189' FNL, 3657' FEL, Sec. 32, T12N, R13E, UM (asp's 635243, 5978570) R-20Ai
At top of productive interval 9. Permit number / approval number
1118' FNL, 4159' FEL, Sec. 31, T12N, R13E, UM (asp's 629418, 5980539) 198-088
At effective depth 10. APl number
4522' FNL, 2344' FEL, Sec. 25, T12N, R12E, UM (asp's 626335, 5982362) 50-029-20641-01
At total depth 11. Field / Pool
2870' FNL, 3132' FEL, Sec. 25, T12N, R12E, UM (asp's 625519, 5984001) Prudhoe Bay Field / Prudhoe Bay Pool
12. Present well condition summary
Total depth: measured 16885 feet Plugs (measured)
true vertical 8914 feet
Effective depth: measured 15044 feet Junk (measured) TD Tag @ 15044' OH (01/10/2001)
true vertical 8959 feet
Casing Length Size Cemented Measured Depth True Vertical Depth
Conductor 110' 20" x 30" 72 c.f. concrete 133' 133'
Surface 2698' 13-3/8" 3720 c.f. Arcticset II 2721' 2721'
Intermediate 11275' 9-5/8" 1665 c.f. G, 130 c.f. AS I 11298' 8643'
Liner 540' 7" 402 c.f. Class 'G' 10829' - 11369' 8290' - 8699'
Sidetrack Liner 3682' 4-1/2" 453 c.f. Class 'G' 11089' - 14771' 8481' - 8969'
RECEIVED
Perforation depth: measured 6" Open Hole Completion 14771' - 16864'
APR 1
true vertical 6" Open Hole Completion 8969' - 8915'
Tubing (size, grade, and measured depth) 4-1/2" 12.6#, L-80 TBG to 11050' MD. 4-1/2" L-80 TBG Tai~ @ 11106'.
Packers & SSSV (b/pe & measured depth) 7" x 4-1/2" BKR S-3 PKR @ 11050', 7" x 4-1/2" BKR ZXP PKR w/HMO LNR HNGR @ 11089'
4-1/2" HES 'X' NIP @ 2053' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14. Representative Dailv Averaqe Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 03/15/2002 2214 1794
Subsequent to operation 03/25/2002 2183 1993
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run __
Daily Report of Well Operations __ Oil __ Gas __ Suspended __ Service WAG Iniector
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
DeWayne R. Schnorr Prepared by DeWayne R. Schnorr 564-517~;r
Form 10-404 Rev 06/15/88 ·
SUBMIT IN DUPLICATE
R-20A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
03/17/2002 SCMOO-B-GONE--SBG: SCMOO-B-GONE
EVENT SUMMARY
03/17/02
PUMPED 232 BBLS OF SCHMOO-B-GONE AND 5 BBLS OF MEOH DOWN
TUBING @ WELLHEAD. TURN OVER TO DSO FOR 3 HR SOAK.
FLUIDS PUMPED
BBLS
5 METHANOL
232 SCMOO-B-GONE
237 TOTAL
Page 1
Well Compliance Report
File on Left side of folder
198-088-0
MD 16885
Microfilm Roll
PRUDHOE BAY UNIT ./R-20A 50- 029-20641-01 BP EXPLORATION (ALASK
TVD 08914 Completion Dat 1/98 Completed Status: WAGJN Current:
/ Roll 2
--
Name
L CCL h~l~AL
L CHEM CTTR ~PINAL
L IMP-GR-MD tf..I-N~L
L IMP-GR-TVD /~AL
Interval Sent Received T/C/D
11240-1
1454
10400-10610 O/2'~lq~ CH 5 8/20/98 8/27/98
11400-16800'~/~/~. 7/1~/~j ~ OH 1/18/99 1/21/99
8700-9000 M~' OH 1/18/99 1/21/99
L RFT FINAL
L SCMT 6F4~AL
Daily Well Ops ~/~J~ --
Was the well cored? yes
Comments:
11572-12000 OH 3/31/98 3/25/98
BL(C) 11050-12019 10/25/99 CH 5 11/16/99 11/23/99
SCHLUM 11325.56-16885.
OH 9/2/98 9/3/98
Are Dry Ditch Samples Required? yes ~________ And Receiv~-?-yes'-rm-:~
Analysis Description Reg~-~kg--3.~o~- Samp~/r~t~#-~-~'
Tuesday, August 01, 2000 Page 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate_ Plugging _ Perforate _
EGO Pull tubing _ Alter casing _ Repair well _ Other_X FCO
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at surface
2089' FSL, 1666' FWL, Sec. 32, T12N, R13E, UM
At top of productive interval
1118' FNL, 4159' FEL, Sec. 31, T12N, R13E, UM
At effective depth
757' FSL, 2344' FEL, Sec. 25, T12N, R12E, UM
At total depth
2409' FSL, 2147' FWL, Sec. 25, T12N, R12E, UM
5. Type of Well:
Development __
Exploratow__
Stratigraphic__
Service__X
(asp's 635243, 5978570)
(asp's n/a)
(asp's 626335, 5982362)
(asp's 625519, 5984001)
6. Datum elevation (DF or KB feet)
RKB 49 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
R-20Ai
9. Permit number / approval number
198-088
10. APl number
50-029-20641-01
11. Field / Pool
Prudhoe Bay Field / Prudhoe Bay Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Conductor 110'
Surface 2698'
Intermediate 11275'
Liner 540'
Sidetrack Liner 3682'
16885 feet Plugs (measured)
8914 feet
15044 feet Junk (measured)
8959 feet
Size Cemented
20" x 30" 72 c.f. concrete
13-3/8" 3720 c.f. Arcticset II
9-5/8" 1665 c.f. G, 130 c.f. AS I
7" 402 c.f. Class 'G'
4-1/2" 453 c.f. Class 'G'
R'ECEIVED
Measured Depth AP'ClJ~'~l'ticalDepth
133' 133'
2721' 2721'
11298' 8643'
10829'-11369' 8290'-8699'
11089'-14771' 8481' -8969'
Perforation depth:
measured 6" Open Hole Completion 14771'- 16864'
true vertical 6" Open Hole Completion 8969' - 8915'
Tubing (size, grade, and measured depth) 4-1/2" 12.6#, L-80 TBG to 11050' MD. 4-1/2" L-80 TBG Tail @ 11106'.
Packers & SSSV (type & measured depth) 7"x4-1/2"BKRS-3PKR @ 11050',7"x4-1/2"BKRZXPPKRw/HMCLNRHNGR@ 11089'
4-1/2" HES 'X' NIP @ 2053' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
OiI-Bbl
Representative Daily Averaqe Production or Injection Data
Gas-Mcf Water-Bbl
Casing Pressure Tubing Pressure
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations __
16. Status of well classification as:
Oil __ Gas __ Suspended __
Service _Water & Gas Injector
17.~~e foregoing is tru/%and/jcorrect
Form 10-404 Rev 06/15/88 ·
to the best of my knowledge.
Title: Technical Assistant
ORIGINAL
Date July 30, 2001
Prepared by DeWayne R. Schnorr 564-51
SUBMIT IN DUPLICATE --~'~
R-20Ai
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
11/14/2ooo
12/12/2000
01/04/2001
01/05/2001
01/06/2001
01/07/2001
01/08/2001
01/09/2001
01/10/2001
11/14/00
12/12/00
01/04/01
01/05/01
FCO.:
FCO.:
FCO.:
FCO.:
FCO.:
FCO.:
FCO.:
FCO.:
FCO.:
DRIFT W/3.625 CENT
STATIC SURVEY
FILL CLEAN OUT - DAY 1
FILL CLEAN OUT - DAY 2
FILL CLEAN OUT - DAY 3
FILL CLEAN OUT - DAY 4
WAITING ON WEATHER
INJECTIVITY TEST, FCO - DAY 5
FILL CLEAN OUT - DAY 6
EVENT SUMMARY
DRIFTED WITH 3.625" CENTRALIZER. OVERCOME BY DEVIATION @ 11883'
WLM.
PERFORMED STATIC BHP SURVEY. 8800 TVD = 5224 PSI, 147 DEG. F.
MIRU DS CTU #5 AND APC TEST UNIT. WEEKLY BOP TEST. PU 2.5" DOWN JET
NOZZLE. RIH. TAG HARD AT 15048'. COULD NOT JET DEEPER. POH TO PU
MOTOR AND MILL.
CON'T FROM 4 JAN' POOH. LD BHA #1. MU BHA #2 - 2-3/8" MOTOR AND 3.55"
MILL. RIH. TAG AT 15039'. WORK THROUGH 15039 TO 15048' WITH SEVERAL
STALLS. RIH TO 15100, SHORT TRIP AND TAG AGAIN AT 15039'. WORK
THROUGH 15039' TO 15150'. SHORT TRIP TO 15050'. CLEAN OUT TO 15800'
MAKING A 50 FT SHORT TRIP EVERY 100 FT CLEANED OUT. POOH TO MAKE
SHORT TRIP TO SHOE. PULL HEAVY AT 15160'. AT 15120' STUCK. WORK PIPE
WHILE CIRCULATING. PUMP 20 BBL BIOZAN PILL WHILE WORKING PIPE.
CON'T TO PUMP AND WORK PIPE. PUMP 50 BBL DIESEL PILL.
01/06/01
01/07/01
01/08/01
01/09/01
CON'T FROM 5 JAN' DISPLACE DIESEL W/KCL. PUMP 70 BBL BIOZAN PILL.
DISPLLACE BIOZAN W/43 BBL DIESEL. DIESEL DISPLACED W/CRUDE. ONCE
BIOZAN AT BIT, CIRCULATION RATE DROPPED TO ABOUT 0.5 BPM. BOTTOMS
UP VOLUME CONTAINED DIESEL. CONTINUE TO WORK PIPE. CIRCULATE
CRUDE AND CONTINUE TO WORK PIPE. SI AND BUILD BACKSIDE PRESSURE
THEN SURGE WELL WHILE WORKING PIPE.
'CON'T FROM JAN 6' LAY DOWN MILL AND MOTOR. UNIT REPAIRS. SHUT
DOWN DUE TO WEATHER. (WIND CHILL BELOW MINIMUM)
WAIT ON WEATHER
DIG OUT FROM STORM. PU 2.25" JSN AND MHA. START RIH.
Page I
01/1 O/2OO 1
CON'T FROM 8 JAN. CON'T RIH TO 14750'. CIRCULATE ANNULUS W/2% KCL.
PUMP 150 BBL 2% KCL (DOUBLE SLICK) DOWN BACKSIDE FOR INJECTIVITY
TEST AT 3.0 BPM. WHP INCREASED FROM 1350 PSI TO 2040 PSI. FINAL
PRESSURE WAS STILL INCREASING AT 20 PSI/10 BBL PUMPED. RIH TO JET
WITH DIESEL/XYLENE. TAGGED AT 15044'. PULL BACK TO 15000'. RIH AND
TAG AGAIN AT 15044'. POOH TO SHOE. WHILE PULLING TO SHOE, STUCK AT
14812'. PUMP DOWN BACKSIDE AND GET FREE. PULL TO SHOE. BULLHEAD
FROM SHOE WITH DIESEL/XYLENE. POH. FREEZE PROTECT COIL & WELL
WITH MEOH. RD CTU #5 AND APC TEST UNIT. **NOTIFY PAD OPERATOR AND
GC 2 THAT WELL IS READY TO BE RETURNED TO INJECTION.**
FLUIDS PUMPED
2 PRESSURE TEST LUBRICATOR W/DIESEL (2 TEST).
93 DIESEL
4O5 CRUDE
939 2% KCL WATER W/J313
70 2% KCL WATER (NONSLICK)
215 60/40 METHANOL WATER
110 BIOZAN (2.0# / BBL)
1834 TOTAL
Page 2
1/26/99
GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
ANN: Sherrie
NO. 12274
Company Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay (Open Hole)
LIS
Well Job # Log Description Date BL Sepia Tape
R-40 ~j~ ~??~ 99026 IMPULSR GR 981113 1 i 1
R-40 99026 IMPULSR GR TVD 981113 1 I
W-19A ::~ ~'~ 99022 IMPULSE-ADN 981215 1 1 1
W-19A 99022 IMPULSE-ADN TVD 981215 1 1
W-19A 99022 DENSITY/NEUTRON 981215 1 !
W-19A 99022 DENSITY/NEUTRON TVD 981215 1 1
R-20A U,~ ~ ~1~l 98623 IMPULSE 980715 i
*REDO-TO ADD A&H CURVES TO EDITED FILE. PRINTS ARE CORRECT.
R-23A ~ ~~:~1 99006 IIMPULSE 971120 1
*REDO-TO ADD A&H CURVES TO EDITED FILE. PRINTS ARE CORRECT.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska)Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Bivd.
Anchorage, Alaska 99519-6612
Date Delivered:
1999
/ laska Oil & Gas Cons. Commission
Schlumberger GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
ATTN: Sherri~-,~--~ ....
Received ~'~'~d~%
1 / 18/99
GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
ANN: Sherrie
NO. 12240
Company Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay (Open Hole)
LIS
Well Job # Log Description Date BL Sepia Tape
q~-o~o
Z-38 ~ ~ ~. 98434 IMPULSE/GR MD (PDC) 980620 1 1 1
Z-38 98434 IMPULSE/GRTVD (PDC) 980620 1 !
R-2OA Lk~(.- %~ ~'~ ~! 98623 IMPULSE/GR/RES MD 980715 1 ! 1
R-20A 98623 I MPULSE/GR/RES TVD 980715 1 I
R-23A -j~. ~ ~ ~ ~ 99006 IMPULSE/GR/RES MD 971120 1 1 1
R-23A 99006 IMPULSE/GR/RES TVD 971120 1 1
R-23A 99006 IMPULSE/BOREHOLE PROF 971120 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc,
Petrotectnical Data Center M83-3
900 E. Benson Bivd,
Anchorage, Alaska 99519-6612
Date Delivered:
RECEIVED
JAi~I '"' 3 1999
A~asi~,a CAi & Gas Cons. Commission
Schlumberger GeoQuest
3940 Arctic BIvd
AA~CNh: o rs~ge r~;eA K 99~
Received ~':~'~~
STATE OF ALASKA . .~
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
I--I Oil I~ Gas ~--I Suspended E~]Abandoned ~]Service Water & Gas Injector
2. Name of Operator 7. Permit Number
BP Exploration (Alaska)Inc. 98-088
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20641-01
4. Location of well at surface ;i' ii,,~?~' ii,.:i~.,::.,ili , _ . . ~ 9. Unit or Lease Name
3190' SNL, 3658' WEL, SEC. 32, T12N, R13E, UM ; , .... ~ '!,, !!.1¢;~,~ "t~::)H~.!' Prudhoe Bay Unit
1118' SNL, 4159' WEL, SEC. 31, T12N, R13E, UM R-20Ai
At total depth ~__~- i~ ~'.U:j~:-, ~ ir~.~~' ' 11. Field and Pool
2409' NSL, 3131' WEL, SEC. 25, T12N, R12E, UM ............... 7t~7.~ ! Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool
KBE = 49.77'I ADL 028257
12. Date Spudded7/3/98 113' Date T' D' Reached I 14' Date C°mp" Susp" °r Aband't15' Water depth' if °fish°re 16' N°' °f C°mpleti°ns7/15/98 7/21/98 N/A MSL One
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)119. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost
16885 8914 FTI 16864 8915 FTI [~Yes l--INoI (Nipple) 2053' MDt 1900'.(Approx.)
22. Type Electric or Other Logs Run
MWD, DIP, 4-Phase RES
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20"x 30" Insulated Conductor Surface 110' 36" 8 cu yds concrete
13-3/8" 72# L-80 Surface 2721' 17-1/2" 3720 cuft Arcticset II
9-5/8" 47# L-80 Surface 11298' 12-1/4" 1665 cu ft Class 'G', 130 cu ft Arcticset I
7" 26# L-80 10829' 11369' 8-1/2" 402 cuft Class 'G'
4-1/2" 12.6# L-80 11089' 14771' 6" 453 cuft Class
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None- 6" Open Hole 4-1/2", 12.6#, L-80 11106' 11050'
MD TVD MD TVD
14771' - 16864' 8969' - 8915' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 150 Bbls of Diesel
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
July 27, 1998I Water & Gas Injection
Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL iCHOKE SIZE IGAs-OIL RATIO
iTEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-DEL O~L GRAWTY-API (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
; 9,98
Alaska 0il & Gas Cons, C0mmiss~u
Anchorage
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
Sag River 11300' 8644'
Shublik 11374' 8702'
Shublik B 11438' 8752'
Shublik C 11457' 8767'
Top of Sadlerochit 11487' 8789'
Zone 3 11733' 8941'
Zone 2 11883' 8995'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is tr~e and correct to the best of my knowledge
Signed ~--~-.. -~.'"~, ~~ 4) ~jq%
Dan Stone Title Engineering Supervisor Date
R-20Ai 98-088 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERA': This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1-' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM ,5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21-' Indicate whether from ground level (GL)or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 2?: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Facility
Date/Time
25 Jun 98
26 Jun 98
27 Jun 98
28 Jun 98
29 Jun 98
Progress Report
PB R Pad
Well R-20A
Rig Nabors 2ES
Page 1
Date 27 August 98
06:00-12:00
12:00-00:00
00:00-03:00
03:00-05:00
05:00-05:30
05:30-06:00
06:00-09:00
09:00-10:00
10:00-12:00
12:00-12:30
12:30-14:30
14:30-15:00
15:00-15:15
15:15-19:30
19:30-21:00
21:00-00:00
00:00-00:30
00:30-02:30
02:30-06:00
06:00-07:30
07:30-08:30
08:30-09:00
09:00-10:30
10:30-11:30
11:30-12:00
12:00-12:30
12:30-14:00
14:00-15:30
15:30-16:30
16:30-17:30
17:30-00:00
00:00-00:30
00:30-03:30
03:30-04:30
04:30-06:00
06:00-08:00
08:00-11:30
11:30-12:00
12:00-12:30
12:30-14:30
14:30-16:00
16:00-16:30
16:30-17:30
17:30-21:30
21:30-22:30
22:30-00:00
00:00-00:30
00:30-03:00
03:00-06:00
06:00-12:00
12:00-12:30
12:30-14:30
14:30-18:30
18:30-20:30
Duration
6hr
12hr
3hr
2hr
1/2 hr
1/2 hr
3 hr
lhr
2 hr
1/2 hr
2 hr
1/2 hr
1/4 hr
4-1/4 hr
1-1/2 hr
3hr
1/2 hr
2 hr
3-1/2 hr
1-1/2 hr
lhr
1/2 hr
1-1/2 hr
lhr
1/2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
lhr
lhr
6-1/2 hr
1/2 hr
3hr
lhr
1-1/2 hr
2 hr
3-1/2 hr
1/2 hr
1/2 hr
2hr
1-1/2 hr
1/2 hr
1 hr
4hr
lhr
1-1/2 hr
1/2 hr
2-1/2 hr
3hr
6hr
1/2 hr
2hr
4hr
2hr
Activity
Rig moved 50.00 %
Rig moved 80.00 %
Rigged up Fluid system
Fill pits with Seawater
Retrieved Accessories
Circulated at 10627.0 ft
Circulated at 10627.0 ft (cont...)
Rigged down Surface tree
Removed Surface tree
Held safety meeting
Rigged up BOP stack
Tested BOP stack
Held drill (Accumulator)
Tested BOP stack
Installed Drillpipe retrieval string
Conducted electric cable operations
Held safety meeting
Rigged up Logging/braided cable equipment
Conducted electric cable operations
Conducted electric cable operations (cont...)
Rigged down Logging/braided cable equipment
Worked stuck pipe at 10600.0 ft
Circulated at 10600.0 ft
Retrieved Tubing hanger
Set Retrievable packer at 30.0 ft with 0.0 psi
Held safety meeting
Retrieved Accessories
Installed Accessories
Retrieved Drillpipe landing string
Circulated at 10600.0 ft
Retrieved Tubing
Held safety meeting
Retrieved Tubing
Installed Wear bushing
Made up BHA no. 1
Made up BHA no. 1 (cont...)
R.I.H. to 7000.0 ft
Held drill (Kick while tripping)
Held safety meeting
R.I.H. to 10700.0 ft
Serviced Block line
Fished at 10750.0 ft
Circulated at 10770.0 ft
Pulled out of hole to 370.0 ft
Laid down fish
Made up BHA no. 2
Held safety meeting
R.I.H. to 10733.0 ft
Milled Production packer at 10733.0 ft
Repaired Rotary table
Held safety meeting
Repaired Rotary table
Milled Production packer at 10733.0 ft
Repaired Rotary table
Progress Report
Facility PB R Pad
Well R-20A
Rig Nabors 2ES
Page 2
Date 27 August 98
Date/Time
20:30-22:00
22:00-23:30
23:30-00:00
30 Jun 98 00:00-00:30
00:30-05:00
05:00-06:00
06:00-09:00
09:00-13:30
13:30-17:00
17:00-18:00
18:00-20:00
20:00-23:30
23:30-00:00
01 Jul 98 00:00-00:30
00:30-02:30
02:30-03:00
03:00-03:30
03:30-06:00
06:00-08:00
08:00-12:00
12:00-12:30
12:30-15:00
15:00-19:30
19:30-20:30
20:30-00:00
02 Jul 98 00:00-00:30
00:30-03:30
03:30-05:30
05:30-06:00
06:00-10:30
10:30-12:00
12:00-12:30
12:30-13:00
13:00-13:15
13:15-13:30
13:30-16:30
16:30-16:45
16:45-17:00
17:00-19:00
19:00-21:00
21:00-21:15
21:15-23:00
23:00-00:00
03 Jul 98 00:00-00:30
00:30-01:00
01:00-01:30
01:30-06:00
06:00-12:00
12:00-12:30
12:30-00:00
04 Jul 98 00:00-00:15
00:15-00:30
00:30-06:00
06:00-07:00
Duration
1-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
4-1/2 hr
lhr
3hr
4-1/2 hr
3-1/2 hr
1 hr
2hr
3-1/2 hr
1/2 hr
1/2 hr
2hr
1/2 hr
1/2 hr
2-1/2 hr
2 hr
4hr
1/2 hr
2-1/2 hr
4-1/2 hr
1 hr
3-1/2 hr
1/2 hr
3hr
2 hr
1/2 hr
4-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
1/4 hr
1/4 hr
3hr
1/4 hr
1/4 hr
2 hr
2hr
1/4 hr
1-3/4 hr
lhr
1/2 hr
1/2 hr
1/2 hr
4-1/2 hr
6 hr
1/2 hr
11-1/2 hr
1/4 hr
1/4 hr
5-1/2 hr
lhr
Activity
Milled Production packer at 10733.0 ft
Circulated at 10733.0 ft
Fished at 10812.0 ft
Held safety meeting
Pulled out of hole to 360.0 ft
Pulled BHA
Laid down fish
Conducted electric cable operations
Repaired Rotary table
Laid down 340.0 ft of Drill collar
Made up BHA no. 3
R.I.H. to 11450.0 ft
Tested Casing - Via annulus
Held safety meeting
Circulated at 11463.0 ft
Pulled out of hole to 9500.0 ft
Serviced Block line
Pulled out of hole to 574.0 ft
Pulled BHA
Conducted electric cable operations
Held safety meeting
Made up BHA no. 4
R.I.H. to 11390.0 ft
Circulated at 11390.0 ft
Milled Liner at 11369.0 ft
Held safety meeting
Milled Liner at 11378.0 ft
Circulated at 11397.0 ft
Pulled out of hole to 11000.0 ft
Pulled out of hole to 150.0 ft (cont...)
Pulled BHA
Held safety meeting
Pulled BHA
Retrieved Wear bushing
Installed BOP test plug assembly
Tested BOP stack
Retrieved BOP test plug assembly
Installed Wear bushing
Made up BHA no. 5
Singled in drill pipe to 3300.0 ft
Tested M.W.D. tool - Via string
R.I.H. to 9900.0 ft
Serviced Block line
Held safety meeting
R.I.H. to 11377.0 ft
Reamed to 11397.0 ft
Drilled to 11430.0 ft
Drilled to 11584.0 ft (cont...)
Held safety meeting
Drilled to 11927.0 ft
Held safety meeting
Held drill (Kick while drilling)
Drilled to 12200.0 ft
Drilled to 12245.0 ft (cont...)
Progress Report
Facility PB R Pad
Well R-20A
Rig Nabors 2ES
Page 3
Date 27 August 98
Date/Time
07:00-08:00
08:00-08:30
08:30-09:00
09:00-12:00
12:00-12:30
12:30-21:30
21:30-21:45
21:45-00:00
05 Jul 98 00:00-00:30
00:30-01:30
01:30-05:00
05:00-06:00
06:00-08:00
08:00-10:30
10:30-12:00
12:00-12:30
12:30-13:00
13:00-16:00
16:00-17:30
17:30-18:00
18:00-18:30
18:30-19:00
19:00-21:30
21:30-22:30
22:30-00:00
06 Jul 98 00:00-00:30
00:30-02:00
02:00-04:00
04:00-06:00
06:00-06:30
06:30-08:30
08:30-11:00
11:00-12:00
12:00-12:30
12:30-00:00
07 Jul 98 00:00-00:30
00:30-06:00
06:00-07:00
07:00-10:30
10:30-12:00
12:00-12:30
12:30-13:00
13:00-15:00
15:00-17:30
17:30-19:00
19:00-20:30
20:30-23:00
23:00-00:00
08 Jul 98 00:00-00:30
00:30-02:00
02:00-02:15
02:15-03:00
03:00-06:00
06:00-12:00
Duration
1 hr
1/2 hr
1/2 hr
3 hr
1/2 hr
9 hr
1/4 hr
2-1/4 hr
1/2 hr
lhr
3-1/2 hr
lhr
2hr
2-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
3 hr
1-1/2 hr
1/2 hr
1/2 hr
1/2 hr
2-1/2 hr
1 hr
1-1/2 hr
1/2 hr
1-1/2 hr
2hr
2 hr
1/2 hr
2 hr
2-1/2 hr
lhr
1/2 hr
11-1/2 hr
1/2 hr
5-1/2 hr
lhr
3-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
2hr
2-1/2 hr
1-1/2 hr
1-1/2 hr
2-1/2 hr
1 hr
1/2 hr
1-1/2 hr
1/4 hr
3/4 hr
3hr
6 hr
Activity
Circulated at 12245.0 ft
Pulled out of hole to 11380.0 ft
R.I.H. to 12245.0 ft
Drilled to 12349.0 ft
Held safety meeting
Drilled to 12650.0 ft
Held drill (Kick while drilling)
Drilled to 12775.0 ft
Held safety meeting
Circulated at 12775.0 ft
Pulled out of hole to 6000.0 ft
Laid down 500.0 ft of 5in OD drill pipe
Pulled out of hole to 300.0 ft
Pulled BHA
Made up BHA no. 6
Held safety meeting
Made up BHA no. 6
R.I.H. to 6900.0 ft
R.I.H. to 11275.0 ft
Serviced Block line
R.I.H. to 12710.0 ft
Washed to 12775.0 ft
Drilled to 12826.0 ft
Circulated at 12826.0 ft
Pulled out of hole to 9000.0 ft
Held safety meeting
Pulled out of hole to 6900.0 ft
Pulled out of hole to 300.0 ft
Pulled BHA
Made up BHA no. 7
R.I.H. to 6900.0 ft
R.I.H. to 12676.0 ft
Washed to 12826.0 ft
Held safety meeting
Drilled to 13284.0 ft
Held safety meeting
Drilled to 13476.0 ft
Drilled to 13545.0 ft (cont...)
Circulated at 13545.0 ft
Pulled out of hole to 11000.0 ft
Held safety meeting
Serviced Block line
Pulled out of hole to 6900.0 ft
Pulled out of hole to 220.0 ft
Pulled BHA
Made up BHA no. 8
R.I.H. to 6900.0 ft
R.I.H. to 8000.0 ft
Held safety meeting
R.I.H. to 13500.0 ft
Held drill (Kick while tripping)
Washed to 13545.0 ft
Drilled to 13666.0 ft
Drilled to 13857.0 ft
Progress Report
Facility PB R Pad
Well R-20A
Rig Nabors 2ES
Page 4
Date 27 August 98
Date/Time
12:00-00:00
09 Jul 98 00:00-06:00
06:00-06:30
06:30-08:30
08:30-12:00
12:00-00:00
10 Jul 98 00:00-04:30
04:30-06:00
06:00-07:30
07:30-13:00
13:00-15:30
15:30-16:30
16:30-17:30
17:30-21:00
21:00-22:30
22:30-01:30
11 Jul 98 01:30-03:00
03:00-03:30
03:30-06:00
06:00-06:30
06:30-10:30
10:30-12:00
12:00-19:00
19:00-20:30
20:30-01:30
12 Jul 98 01:30-02:00
02:00-05:30
05:30-06:00
06:00-07:00
07:00-09:30
09:30-06:00
13 Jul 98 06:00-06:00
14 Jul 98 06:00-00:30
15 Jul 98 00:30-03:00
03:00-06:00
06:00-07:00
07:00-08:00
08:00-11:30
11:30-17:00
17:00-19:00
19:00-20:00
20:00-20:30
20:30-21:30
21:30-02:30
16 Jul 98 02:30-03:00
03:00-03:30
03:30-06:00
06:00-08:30
08:30-09:00
09:00-10:30
10:30-11:00
11:00-12:00
12:00-13:30
13:30-15:30
Duration
12hr
6hr
1/2 hr
2hr
3-1/2 hr
12hr
4-1/2 hr
1-1/2 hr
1-1/2 hr
5-1/2 hr
2-1/2 hr
lhr
1 hr
3-1/2 hr
1-1/2 hr
3hr
1-1/2 hr
1/2 hr
2-1/2 hr
1/2 hr
4hr
1-1/2 hr
7 hr
1-1/2 hr
5hr
1/2 hr
3-1/2 hr
1/2 hr
1 hr
2-1/2 hr
20-1/2 hr
24 hr
18-1/2 hr
2-1/2 hr
3hr
lhr
1 hr
3-1/2 hr
5-1/2 hr
2 hr
1 hr
1/2 hr
lhr
5hr
1/2 hr
1/2 hr
2-1/2 hr
2-1/2 hr
1/2 hr
1-1/2 hr
1/2 hr
1 hr
1-1/2 hr
2hr
Activity
Drilled to 14030.0 ft
Drilled to 14130.0 ft
Drilled to 14144.0 ft
Circulated at 14144.0 ft
Drilled to 14335.0 ft
Drilled to 14883.0 ft
Drilled to 15063.0 ft
Circulated at 15063.0 ft
Circulated at 15063.0 ft
Pulled out of hole to 6880.0 ft
Pulled out of hole to 200.0 ft
Pulled BHA
Installed BOP test plug assembly
Tested BOP stack
Made up BHA no. 9
R.I.H. to 6900.0 ft
R.I.H. to 11305.0 ft
Serviced Block line
R.I.H. to 11820.0 ft
Reamed to 11820.0 ft
Underreamed to 12300.0 ft
Underreamed to 12255.0 ft
Underreamed to 13254.0 ft
Laid down 837.0 ft of 5in OD drill pipe
Underreamed to 13780.0 ft
R.I.H. to 13910.0 ft
Underreamed to 14300.0 ft
Laid down 744.0 ft of 5in OD drill pipe
Laid down 744.0 ft of 5in OD drill pipe
Underreamed to 15063.0 ft
Drilled to 15710.0 ft
Drilled to 16425.0 ft
Drilled to 16885.0 ft
Circulated at 16885.0 ft
Pulled out of hole to 13167.0 ft
Pulled out of hole to 11285.0 ft
Serviced Block line
Pulled out of hole to 6900.0 ft
Pulled out of hole to 200.0 ft
Pulled BHA
Rigged up Casing handling equipment
Held safety meeting
Ran Liner to 80.0 ft (4-1/2in OD)
Ran Liner to 3800.0 ft (4-1/2in OD)
Installed Liner hanger
Circulated at 3650.0 ft
Ran Liner on landing string to 8000.0 ft
Pulled Liner in stands to 11300.0 ft
Circulated at 11300.0 ft
Pulled Liner in stands to 14771.0 ft
Circulated at 14771.0 ft
Functioned Inflatable packer
Held safety meeting
Mixed and pumped slurry - 80.000 bbl
Progress Report
Facility PB R Pad
Well R-20A
Rig Nabors 2ES
Page 5
Date 27 August 98
Date/Time
15:30-16:30
16:30-17:30
17:30-23:00
23:00-00:00
17 Jul 98 00:00-03:30
03:30-06:00
06:00-11:30
11:30-16:30
16:30-17:30
17:30-05:30
18 Jul 98 05:30-06:00
06:00-10:00
10:00-10:30
10:30-15:30
15:30-17:00
17:00-18:30
18:30-03:00
19 Jul 98 03:00-04:00
04:00-06:00
06:00-06:30
06:30-09:15
09:15-10:30
10:30-17:00
17:00-18:00
18:00-04:00
20 Jul 98 06:00-06:30
06:30-08:00
08:00-08:30
08:30-09:00
09:00-20:30
20:30-21:30
21:30-22:00
22:00-22:30
22:30-04:00
21 Jul 98 04:00-05:30
05:30-06:00
06:00-06:30
06:30-08:30
08:30-13:30
13:30-06:00
22 Jul 98 06:00-06:15
Duration
1 hr
1 hr
5-1/2 hr
1 hr
3-1/2 hr
2-1/2 hr
5-1/2 hr
5 hr
1 hr
12hr
1/2 hr
4hr
1/2 hr
5 hr
1-1/2 hr
1-1/2 hr
8-1/2 hr
lhr
2 hr
1/2 hr
2-3/4 hr
1-1/4 hr
6-1/2 hr
lhr
10hr
1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
11-1/2 hr
1 hr
1/2 hr
1/2 hr
5-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
2hr
5 hr
16-1/2 hr
1/4 hr
Activity
Circulated at 11089.0 ft
Laid down 210.0 ft of Drillpipe
Pulled Drillpipe in stands to 0.0 ft
Retrieved B ore protector
Tested BOP stack
Made up BHA no. 10
Made up BHA no. 10
R.I.H. to 14622.0 ft
Tested Casing - Via annulus and string
Drilled cement to 14622.0 ft
Pulled out of hole to 14000.0 ft
Pulled out of hole to 5.0 ft
Circulated at 11000.0 ft
Pulled out of hole to 250.0 ft
Pulled BHA
Made up BHA no. 11
R.I.H. to 14725.0 ft
Drilled installed equipment - Landing collar
R.I.H. to 16800.0 ft
Reamed to 16864.0 ft
Jarred stuck pipe at 16864.0 ft
Pulled out of hole to 16330.0 ft
Circulated at 16330.0 ft
Serviced Block line
Laid down 9900.0 ft of 5in OD drill pipe
Laid down 2000.0 ft of 2~3/8in OD drill pipe
Pulled BHA
Removed Wear bushing
Rigged up Tubing handling equipment
Ran Tubing to 11050.0 ft (4-1/2in OD)
Space out tubulars
Rigged down Tubing handling equipment
Installed Tubing hanger
Circulated at 11093.0 ft
Set packer at 11036.0 ft with 4000.0 psi
Installed Hanger plug
Installed Hanger plug
Rigged down BOP stack
Installed Tubing bonnet
Serviced BOP stack
Held safety meeting
Client:
Field:
SU
Anaddll
S EP 0:5 1998
BP Exploration (Alaska), J~ska 0ii & 6as Cons, Commission
Prudhoe Bay Anchorage
Well Name: R-20Ai
APl number: 50-029-20641-01
Job number: 40002645
Rig: Nabors 2ES
County: NSB
State: AK
Survey Calculations
Calc method for positions: Minimum Curvature
Calc method for DLS: Mason & Taylor
Depth references
Permanent datum MSL 0 ff
Depth reference KB 49.77 It
GLabove Permanent 21.81 It
KB above Permanent 49.77 It
DF above Permanent 48.37 It
Vertical section odgin
Latidude (+N/S-): 2077.8 ff
Departure (+E/W-): -5795.2 ff
REC- IVED. 19-91]
, /',gRIG!NAL
Spud Date:
Last survey date:
Total accepted surveys:
MD of first survey:
MD of last survey:
26-Jun-98
15-Jul-98
174
11325.56 It
16885.00 It
Geomagnetic data
Magnetic Model: BGGM 1997 Version
Magnetic Date: ~ 15-Jun-98
Magnetic field strength: 1146.35 HCNT
Magnetic dec (+E/VV-): 28.05 degrees
Magnetic Dip: 80.73 degrees
MWD Survey Reference Criteda
Reference G:
Reference H:
Reference Dip:
Tolerance G:
Tolerance H:
Tolerance Dip:
1002.68 milliG
1146.35 HCNT
80.73 degrees
3 milliG
6 HCNT
0.3 degrees
Azim from RTto target: 317.11 degrees
Schlumberger ANADRILL Survey Report
Seq Measured Incl Azimuth Course
# Depth angle angle length
(fi) (deg) (deg) (fi)
1 11325.56 38.25 299.0 0.00
2 11395.85 38.35 298.5 70.20
3 11428.08 39.94 298.3 32.30
4 11460.30 39.94 298.1 32.20
5 11492.40 41.75 297.9 32.10
TVD
depth
(it)
8664.48
8719.55
8744.60
8769.29
8793.57
Correcton
Magnetic dec (+E/W-):
Gdd convergence (+E/W-):
Total az corr (+E/W-):
28.05 degrees
0 degrees
28.05 degrees
Vertical Displacement
section +N/S- +E/VV-
(it) (ft) (it)
5466.99 2077.80 -5795.20
5508.31 2098.74 -5833.37
5527.63 2108.44 -5851.30
5547.18 2118.20 -5869.52
5567.01 2128.04 -5888.07
Total at Azm DLS
displacement (deg/
(fl) (deg) 100f)
6156.43 289.72 0.00
6199.42 289.79 0.45
6219.58 289.82 4.94
6240.04 289.84 0.40
6260.82 289.87 5.67
6 11524.28 44.54 297.6 31.90 8816.85 5587.59
7 11556.55 47.41 297.4 32.30 8839.29 5609.46
8 11586.57 49.70 297.9 30.00 8859.15 5630.67
9 11618.37 52.39 297.0 31.80 8879.14 5653.95
'10 11650.15 55.20 296.9 31.70 8897.86 5677.96
2138.18 -5907.38
2148.90 -5927.98
2159.34 -5947.90
2170.74 -5969.84
2182.33 -5992.64
6282.43 289.90
6305.45 289.93
6327.73 289.95
6352.25 289.98
6377.64 290.01
8.76
8.90
7.73
8.74
8.87
11 11682.03 57.93 297.0 31.90 8915.44 5702.95
12 11713.50 60.54 297.9 31.50 8931.55 5728.44
13 11745.16 63.18 299.0 31.70 8946.50 5754.93
2194.39 -6016.37
6404.06 290.04
6430.90 290.07
6458.55 290.11
8.56
8.64
8.87
Page 1
Alaska 0il & Gas Cons. Commiss,
Anchorage
Schlumberger ANADRILL Survey Report
Seq Measured Incl Azimuth Course TVD Vertical Displacement
(deg/
lOO0
10.60
9.22
Total ' at Azm
# Depth angle angle length depth section +N/S- +E/W- displacement
(fi) (deg) (deg,) (fi) (fi) (fi) (fi) (fi) (fi)
14 11777.05 66.18 300.7 31.80 8960.10 5782.38 2234.50 -6089.88 6486.88
15 11809.12 68.99 301.7 32.10 8972.34 5810.91 2249.87 -6115.26 6516.00
16 11840.66 71.84 302.7 31.60 8982.93 5839.68 2265.73 -6140.45 6545.12
17 11872.92 73.95 302.8 32.20 8992.40 5869.50 2282.38 -6166.33 6575.17
18 11904.53 76.61 301.5 31.60 9000.43 5899.02 2298.64 -6192.20 6605.08
19 11936.07 79.21 300.1 31.60 9007.05 5928.67 2314.46 -6218.74 6635.47
20 11967.61 81.26 298.8 31.50 9012.39 5958.25 2329.72 -6245.77 6666.13
21 11999.04 83.72 297.0 31.40 9016.49 5987.65 2344.29 -6273.28 6697.00
22 12030.23 86.77 296.3 31.20 9019.08 6016.78 2358.23 -6301.07 6727.91
23 12062.17 88.90 297.1 32.00 9020.29 6046.75 2372.60 -6329.63 6759.70
24 12094.24 89.73 298.2 32.00 9020.67 6076.92 2387.45 '-6357.98 6791.45
25 12125.88 90.03 299.5 31.70 9020.74 6107.02 2402.74 -6385.74 6822.82
26 12157.82 90.48 300.8 31.90 9020.60 6137.53 2418.76 -6413.33 6854.28
27 12187.85 90.34 300.2 30.10 9020.38 6166.38 2434.04 -6439.26 6883.94
28 12221.65 90.00 299.3 33.80 9020.28 6198.64 2450.81 -6468.60 6917.32
29 12253.90 89.35 299.5 32.20 9020.46 6229.32 2466.62 -6496.66 6949.15
30 12284.22 89.66 299.2 30.30 9020.72 ' 6258.17 2481.47 -6523.07 6979.12
31 12316.37 91.23 301.8 32.20 9020.47 6289.03 2497.81 -6550.81 7010.86
32 12348.54 90.93 301.2 32.10 9019.87 6319.94 2514.58 -6578.17 7042.40
33 12381.37 91.17 302.3 32.90 9019.27 6351.66 2531.89 -6606.14 7074.71
-34 12412.33 91.27 304.4 30.90 9018.61 6381.66 2548.87 -6631.95 7104.89
35 12444.57 90.41 302.6 32.30 9018.13 6413.05 2566.69 -6658.88 7136.42
36 12476.25 90.24 301.1 31.60 9017.95 6443.54 2583.37 -6685.72 7167.47
37 12506.69 90.17 299.4 30.50 9017.84 6472.73 2598.73 -6712.06 7197.58
38 12538.91 90.21 297.8 32.20 9017.74 6503.26 2614.15 -6740.33 7229.51
39 12571.06 89.90 298.0 32.20 9017.71 6533.67 2629.21 -6768.79 7261.49
40 12602.61 89.45 298.8 31.50 9017.89 6563.51 2644.20 -6796.50 7292.75
41 12634.99 88.70 300.1 32.40 9018.41 6594.38 2660.12 -6824.71 7324.81
42 12664.80 88.35 299.9 29.80 9019.18 6622.85 2675.02 -6850.51 7354.26
43 12696.88 88.08 299.8 32.10 9020.18 6653.49 2690.99 -6878.33 7385.99
44 12719.42 89.21 298.6 22.50 9020.71 6674.90 2701.96 -6897.97 7408.28
45 12756.08 90.03 296.0 36.70 9020.95 6709.42 2718.79 -6930.58 7444.78
46 12783.02 90.00 295.6 26.90 9020.94 6734.49 2730.50 -6954.80 7471.60
47 12818.78 90.07 295.8 35.80 9020.92 6767.82 2746.02 -6987.05 7507.30
48 12849.72 90.89 297.5 30.90 9020.66 6796.77 2759.88 -7014.67 7538.07
49 12881.72 91.51 297.5 32.00 9019.99 6826.91 2774.66 -7043.05 7569.89
50 12913.48 91.71 298.1 31.80 9019.10 6856.91 2789.48 -7071.17 7601.49
51 12945.97 91.65 298.3 32.50 9018.15 . 6887.64 2804.83 -7099.80 7633.75
52 12976.39 90.65 297.6 30.40 9017.54 6916.35 2819.08 -7126.64 7663.96
53 13007.37 91.06 298.3 31.00 9017.07 6945.63 2833.61 -7154.03 7694.76
54 13037.85 91.51 297.8 30.50 9016.39 6974.46 2847.94 -7180.94 7725.06
(deg)
290.15
290.20
290.25
290.31
290.37
290.41
290.46
290.49
290.52
290.55
290.58
290.62
290.66
290.71
290.75
290.79
290.83
290.87
290.92
290.97
291.02
291.08
291.13
291.17
291.20
291.23
291.26
291.29
291.33
291.37
291.39
291.42
291.44
291.46
291.48
291.50
291.53
291.56
291.58
291.61
291.63
9.50
6.56
9.31
9.30
7.67
· .
9.68
10.03
7.11
4.31
4.21
4.31
2.05
2.85
2.11
1.42
9.43
2.09
3.42
6.80
6.18
4.78
5.58
4.97
1.15
2.91
4.63
1.35
0.90
7.32
7.43
1.49
0.59
6.11
1.94
1.99
0.64
4.01
2.62
2.21
Page 2
Schlumberger ANADRILL Survey Report
Seq Measured Incl Azimuth Course TVD
# Depth angle angle length depth
(fi) (deg;) (deg) (fi) (fi:)
55 13070,02 91,30 299,3 32,10 9015,60
Vertical Displacement
section +N/S- +E/W-
(fi:) (fi:) (it)
7004.88 2863.28 -7209.12
56 13101,90 91.06 298,4 31,90 9014,95 7035,17 2878,67-7237,06
57 13134,14 91,65 296,9 32,20 9014,18 7065.52 2893.61 -7265,57
58 13165,01 92,33 296,4 30,90 9013,11 7094,46 2907,46 -7293,17
59 13197,10 91,92 296,5 32,10 9011,92 7124,47 2921,75-7321,89
60 13229,27 90,62 '295,4 32,20 9011,21 7154,49 2935,83 -7350,84
61 13260,67 90,86 295,8 31,40 9010,80 7183,71 2949.40-7379,15
62 13292,79 90,96 296,0 32,10 9010,29 7213,63 2963,42 -7408,02
63 13325,03 90,93 296,9 32,20 9009,76 7243,76 2977,76 -7436,85
64 13357,28 89,86 297,5 32,30 9009,54 7274,13 2992,52 -7465,58
65 13389,49 90,14 297,4 32,20 9009,54 7304,45 3007,37 '-7494,15
66 13421,42 90,72 298,3 31,90 9009,30 7334,57 3022,27 -7522,35
67 13451,78 90,82 297,5 30,40 9008,89 7363,27 3036,49 -7549,22
68 13483,54 90,31 297,3 31,70 9008,58 7393,12 3051,08 -7577,36
69 13514,19 90,24 298,3 30,70 9008,43 7422,09 3065,40 -7604,52
70 13545,87 90,58 299,3 31,70 9008,20 7452,19 3080,67 -7632,29
71 13577,45 91,37 298,4 31,60 9007,67 7482,19 3095,91 -7659,97
72 13609,01 93,09 300,4 31,50 9006,44 7512,18 3111,36 -7687,39
73 13640,96 93,33 300,8 32,00 9004,65 7542,81 3127,63 -7714.89
74 13672,91 93,64 300,8 31,90 9002,71 7573,37 3143,93 -7742,24
-75 13705,43 93,77 302,7 32,50 9000,61 7604,65 3161,00 -7769,82
76 13738,38 93,63 303,5 33,00 8998,48 7636,60 3178,98 -7797,40
77 13767,00 93,46 302,8 28,60 8996,71 7664,30 3194,59 -7821,30
78 13798,70 93,57 301,4 31,70 8994,77 7694,86 3211,40 -7848,11
79 13831,12 93,67 301,8 32,40 8992,72 7726,02 3228,35 -7875,65
80 13862,94 93,94 301,6 31,80 8990,61 7756,61 3245,02 -7902,64
81 13895,00 94,11 301,5 32,10 8988,36 7787,46
82 13927,49 93,84 300,6 32,50 8986,10 7818,62
83 13959,66 93,94 301,6 32,20 8983,92 7849,50
84 13992,25 93,94 301,3 32,60 8981,68 7880,82
85 14024,34 94,08 301,9 32,00 8979,44 7911,58
86 14056,36 94,19 302,6 32,10 8977,13 7942,52
87 14087,14 94,36 301,9 30,70 8974,84 7972,11
88 14118,60 94,77 301,9 31,50 8972,33 8002,42
89 14150,96 92,74 301,5 32,40 8970,21 8033,58
90 14182,57 91,40 301,1 31,60 8969,07 8063,97
91 14214,34 90,24 301,6 31,70 8968,61 8094,48
92 14246,43 89,59 301,7 32,10 8968,66. 8125,42
93 14277,62 89,31 302,3 31,20 8968,96 8155,54
94 14309,17 89,38 303,2 31,60 8969,32 8186.15
95 14341,05 89,66 303,6 31,90 8969,59 8217,14
3261,77 -7929,93
3278,50 -7957,71
3295,09 -7985,21
3312,06 -8012,96
3328,78 -8040,15
3345,87 -8067,22
3362,21 -8093,12
3378,80 -8119,77
3395,79 -8147,28
3412,19 -8174,26
3428,68 -8201,33
3445,53 -8228,66
3462,06 -8255,11
3479,15 -8281,69
3496,71 -8308,32
Total ' at Azm DLS
displacement (deg/
(fi:) (deg) lOOf)
7756.92 291.66 4.72
7788,56 291,69 2,92
7820.58 291.72 5,00
7851,35 291,73 2,73
7883,32 291,75 1,31
7915,42 291,77 5,29
7946,75 291,79 -1,49
7978,76 291,80 0,70
8010,85 291,82 2,80
8043,01 291,84 3,80
8075,06 291,87 0,92
8106,78 291,89 3,36
8137,01 291,91 2,65
8168,57 291,93 1,73
8199,11 291,95 3,27
8230,58 291,98 3,33
8261,95 292,01 3,79
8293,16 292,03 8,37
8324,76 292,07 1,46
8356,23 292,10 0,97
8388,20 292,14 5,85
8420,54 292,18 2,46
8448,56 292,22 2,51
8479,73 292,25 4,42
8511,64 292,29 1,27
8542,95 292,32 1,06
8574,55 292,36 0,61
8606,60 292,39 2,88
8638,36 292,42 3,11
8670,48 292,46 0,92
8702,00 292,49 1,92
8733,55 292,53 2,20
8763,73 292,56 2,34
8794,71 292,59 1,30
8826,64 292,63 6,39
8857,86 292,66 4,43
8889,19 292,69 3198
8920,90 292,72 2,05
8951,69 292,75 2,12
8982,81 292,79 2,86
9014,16 292,82 1,53
Page 3
Schlumberger ANADRILL Survey Report
Seq Measured Incl Azimuth Course
# Depth angle angle length
(fi) (;deg,) (degt (fi)
TVD
depth
(ft)
96 14372.20 89.97 303.6 31.10 8969.69
97 14403.94 89.90 304.5 31.70 8969.73
98 14435.75 89.93 304.0 31.90 8969.77
99 14467.75 90.17 304.9 31.90 8969.75
100 14499.61 88.94 305.1 31.90 8969.99
Vertical Displacement
section +N/S- +E/W-
(ft)
8247.38
8278.26
8309.36
8340.49
8371.68
101 14531.38 89.01 305.0 31.80 8970.56 8402.77
102 14563.45 89.01 305.1 32.10 8971.12 8434.16
103 14595.28 89.28 305.7 31.80 8971.59 8465.29
104 14626.12 89.69 306.1 30.80 8971.87 8495.51
105 14657.81 91.06 307.7 31.70 8971.66 8526.71
106 14689.83 91.44 309.3 32.00 8970.96 8558.34
107 14721.30 91.54 309.7 31.50 8970.14 8589.55
108 14752.88 91.71 308.6 31.60 8969.25 8620.83
109 14785.00 91.40 312.0 32.10 8968.38 8652.69
110 14816.15 91.71 313.9 31.20 8967.53 8683.80
111 14847.96 92.54 315.8 31.80 8966.35 8715.55
112 14880.17 92.50 317.9 32.20 8964.93 8747.71
113 14911.12 92.64 319.7 30.90 8963.55 8778.57
114 14942.79 92.43 321.4 31.70 8962.15 8810.18
115 14974.66 92.19 320.0 31.90 8960.86 8841.99
116 15005.30 91.78 321.6 30.60 8959.80 8872.51
117 15036.93 90.72 321.0 31.60 8959.11 8904.01
118 15068.78 90.99 322.0 31.90 8958.64 8935.81
119 15100.60 90.65 321.6 31.80 8958.18 8967.50
120 15132.58 91.51 324.5 32.00 8957.58 8999.32
121 15164.72 92.26 327.8 32.10 8956.52 9031.00
122 15195.60 91.85 329.6 30.90 8955.41 9061.25
123 15227.39 91.13 328.8 31.80 8954.58 9092.33
124 15259.19 92.50 328.1 31.80 8953.58 9123.49
125 15290.47 92.26 329.4 31.30 8952.28 9154.12
126 15322.98 91.58 329.7 32.50 8951.19 9185.84
127 15354.49 91.61 328.1 31.50 8950.31 9216.66
128 15386.61 92.98 329.3 32.10 8949.03 9248.08
129 15418.73 91.92 328.3 32.10 8947.66 9279.48
130 15450.20 91.58 327.3 31.50 8946.69 9310.42
3513.92 -8334.22
3531.67 -8360.49
3549.62 -8386.85
3567.67 -8413.16
3585.97 -8439.29
3604.23 -8465.32
3622.66 -8491.59
3641.08 -8517.51
3659.14 -8542.46
3678.17 -8567.81
3698.08 -8592.84
3718.11 -8617.14
3738.06 -8641.64
3758.81 -8666.11
3780.06 -8688.93
3802.47 -8711.46
3825.93 -8733.46
3849.16 -8753.79
3873.61 -8773.92
3898.28 -8794.11
3921.98 -8813.43
3946.63 -8833.19
3971.59 -8853.04
3996.58 -8872.70
4022.15 -8891.93
4048.79 -8909.80
4075.17 -8925.84
4102.48 -8942.12
4129.56 -8958.75
4156.30 -8974.97
4184.30 -8991.44
4211.26 -9007.70
4238.66 -9024.36
4266.10 -9040.97
4292.74 -9057.75
131 15482.40 91.23 326.6 32.20 8945.90 9342.13 4319.72 -9075.31
132 15513.75 92.95 326.9 31.30 8944.76 9372.97 4345.88 -9092.46
133 15545.71 93.29 325.8 32.00 8943.02. 9404.51 4372.48 -9110.16
134 15577.57 93.02 325.9 31.90 8941.26 9435.99 4398.83 -9128.04
135 15609.51 93.29 326.5 31.90 8939.51 9467.44 4425.30 -9145.76
Total ' at Azm DLS
displacement (deg/
(fi) Ideg) 100~
9044.72 292.86 1.00
9075.82 292.90 2.85
9107.09 292.94 1.57
9138.36 292.98 2.92
9169.56 293.02 3.91
9200.66 293.06 0.38
9232.05 293.10 -0.31
9263.12 293.15 2.07
9293.16 293.19 1.86
9323.96 293.23 6.64
9354.83 293.29 5.14
9385.07 293.34 1.31
9415.46 293.39 3.52
9446.17 293.45 10.63
9475.57 293.51 6.17
9505.17 293.58 6.52
9534.73 293.66 6.52
9562.69 293.74 5.84
9590.96 293.82 5.40
9619.40 293.91 4.45
9646.68 293.99 5.39
9674.76 294.07 3.85
9703.09 294.16 3.25
9731.27 294.25 1.65
9759.31 294.34 9.45
9786.59 294.44 10.54
9812.12 294.54 5.97
9838.29 294.64 3.38
9864.71 294.75 4.84
9890.65 294.85 4.22
9917.37 294.96 2.29
9943.51 295.06 5.08
9970.22 295.16 5.67
9996.94 295.26 4.54
10023.50 295.36 3.35
10050.93 295.45 2.43
10077.67 295.55 5.58
10105.13 295.64 3.59
10132.67 295.73 0.90
10160.13 295.82 2.06
Page 4
Schlumberger ANADRILL Survey Report
Seq Measured Incl Azimuth Course 'I'VD Verlical Displacement Total' at Azm DLS
# Depth angle angle length depth section +N/S- +ENV- displacement (deg/
(fi) (deg) (deg) (fi) (fi) (fi) (fi) (fi) (fi) (deg) 100f)
136 15641.45 93.39 328.6 32.00 8937.64 9498.85 4452.26 -9162.90 10187.31 295.92 6.56
137 15672.60 92.40 331.5 31.10 8936.07 9529.12 4479.17-9178.40 10213.03 296.01 9.84
138 15703.59 91.95 332.6 31.00 8934.90 9559.05 4506.53 -9192.92 10238.10 296.11 3.83
139 15735.24 91.61 333.2 31.60 8933.92 9589.44 4534.65 -9207.31 10263.41 296.22 2.18
140 15767.40 91.54 333.4 32.20 8933.03 9620.35 4563.40 -9221.77 10289.11 296.33 0.66
141 15799.45 91.89 '335.8 32.00 8932.07 9650.85' 4592.30 -9235.49 10314.24 296.44 7.58
142 15831.33 92.23 338.8 31.90 8930.93 9680.76 4621.70 -9247.79 10338.37 296.55 9.46
143 15862.70 92.02 339.6 31.40 8929.76 9709.84 4651.04 -9258.94 10361.47 296.67 -2.63
144 15894.13 91.68 339.7 31.40 8928.75 ' 9738.82 4680.46 -9269.85 10384.45 296.79 1.13
145 15926.31 91.34 339.1 32.20 8927.90 9768.60 4710.59-9281.17 10408.16 296.91 2.14
146 15958.13 90.72 337.1 31.80 8927.33 9798.28 4740.09'-9293.03 10432.11 297.02 6.58
147 15988.68 90.34 337.3 30.60 8927.04 9827.02 4768.30 -9304.89 10455.51 297.13 1.40
148 16020.63 90.51 337.1 31.90 8926.81 9856.98 4797.70 -9317.25 10479.94 297.25 0.82
149 16052.53 91.10 341.0 31.90 8926.36 9886.55 4827.49 -9328.65 10503.73 297.36 12.36
150 16084.22 91.03 342.0 31.70 8925.77 9915.42 4857.54 -9338.71 10526.50 297.48 3.16
151 16116.41 90.75 340.6 32.20 8925.27 9944.78 4888.04 -9349.03 10549.76 297.60 4.43
152 16148.04 90.79 339.7 31.60 8924.85 9973.86 4917.76 -9359.76 10573.05 297.72 2.85
153 16179.61 91.03 338.7 31.60 8924.34 10003.13 4947.29 -9370.98 10596.75 297.83 3.25
154 16211.71 91.30 341.1 32.10 8923.69 10032.72 4977.43 -9382.01 10620.59 297.95 7.52
155 16244.31 91.20 341.0 32.60 8922.98 10062.50 5008.26 -9392.59 10644.41 298.07 0.43
156 16275.26 90.69 338.7 31.00 8922.47 10091.08 5037.35 -9403.27 10667.54 298.18 7.60
157 16306.85 90.55 340.3 31.60 8922.13 10120.30 5066.95 -9414.34 10691.29 298.29 5.08
158 16336.71 90.75 340.0 29.80 8921.79 10147.72 5094.98 -9424.45 10713.50 298.40 1.21
159 16368.89 90.48 339.8 32.20 8921.44 10177.40 5125.22 -9435.52 10737.64 298.51 1.04
160 16400.93 90.21 339.9 32.00 8921.25 10206.91 5155.26 -9446.54 10761.68 298.62 0.90
161 16432.61 90.24 339.8 31.70 8921.13 10236.14 5185.02 -9457.46 10785.54 298.73 0.33
162 16464.68 90.45 340.7 32.10 8920.93 10265.66 5215.23 -9468.31 10809.60 298.85 2.88
163 16496.87 90.79 339.4 32.20 8920.59 10295.31 ' 5245.49 -9479.30 10833.85 298.96 4.17
164 16528.69 90.62 338.8 31.80 8920.19 10324.79 5275.20 -9490.64 10858.17 299.07 1.96
165 16560.91 90.55 339.6 32.20 8919.87 10354.62 5305.30 -9502.07 10882.81 299.18 2.49
166 16592.89 90.69 339.5 32.00 8919.52 10384.19 5335.28 -9513.25 10907.21 299.28 0.54
167 16624.94 90.75 338.2 32.00 8919.12 10413.91 5365.12 -9524.80 10931.89 299.39 4.07
168 16657.01 90.72 339.4 32.10 8918.70 10443.73 5395.04 -9536.40 10956.71 299.50 3.74
169 16688.84 90.96 338.9 31.80 8918.24 10473.20 5424.76 -9547.72 10981.21 299.60 1.74
170 16720.78 91.23 338.1 32.00 8917.63 10502.99 5454.53 -9559.45 11006.13 299.71 2.64
171 16752.08 91.23 337.8 31.30 8916.96 10532.24 5483.53 -9571.19 11030.72 299.81 0.96
172 16783.87 91.27 336.7 31.80 8916.26 10562.08 5512.85 -9583.49 11055.98 299.91 3.46
173 16825.15 91.10 336.4 41.30 8915.41 10601.02 5550.73 -9599.92 11089.14 300.04 0.83
174 16885.00 91.10 336.4 59.80 8914.26. 10657.46 5605.50 -9623.91 11137.38 300.22 0.17
Page 5
Alaska 0il & Gas C,~
Anch0:
State of Alaska
Alaska Oil & Gas Conservation Comm.
Atten: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Transmittal of Final Prints. Please sign and return copy to the following'
Western Altas Logging Services
Pouch 340013
Prudhoe Bay, AK 99734-0013
and
BP Exploration (Alaska)Inc.
Petrotechnical Data Center MB 3-3
900 E. Benson Blvd.
Anchorage, AK 99519-6612
08-Jul-98
Well Name
Services Bluelines R/F Sepia Film
CCL SETTING SERVICE 1 1
_
Date
:
Contact Rebecca Lange if you have a question concerning this transmittal
at (907) 659-2816 or Fax (907) 659-2602.
TONY KNOWLE$, GOVERNOB
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
May 14, 1998
Dan Stone
Engineering Supervisor
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
ae~
Prudhoe Bav Unit R-20Ai
BP Exploration (Alaska) Inc.
Permit No. 98-088
Sur. Loc. 3190'SNL, 3658'WEL, Sec. 32, T12N, R13E, UM
Btmnhole Loc. 2916'NSL, 3070"vVEL, Sec. 25, T12N, R12E. UM
Dear Mr. Stone:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and docs not authorize conducting drilling operations until all other
required permitting determinations arc made.
The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035;
and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC
25.412 and 20 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before
operation, and of the BOPE test performed before drilling below the surface casing shoe, must be
given so that a representative of the Commission max, witness thc tests. Notice may be given by
tor on the North Slope pager at 659-3607.
David W. I,ohnston \ ~
Chairman ~
BY ORDER OF THE COMMISSION
dlffEnclosures
cc~
Department of Fish & Game, Habitat Section w/o cncl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA"~L AND GAS CONSERVATION COIV~,.,IISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepen [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan KBE = 49.21' Prudhoe Bay Field / Prudhoe
13. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028257
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
3190' SNL, 3658' WEL, SEC. 32, T12N, R13E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number Number 2S100302630-277
455' NSL, 2182' WEL, SEC. 25, T12N, R12E, UM R-20Ai
At total depth 9. Approximate spud date Amount $200,000.00
2916' NSL, 3070' WEL, SEC. 25, T12N, R12E, UM 05/29/98
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 047448, 2364'I R-25A, 220' at 11569' 2560 17429' MD /8900 TVDss
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
KickOff Depth 11445' Maximum HoleAn,qle 98° Maximum surface 3300 psig, At total depth (TVD) 8800'/4390 psig
18. Casing Program Setting Depth
Size Specifications Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
6" 4-1/2" 12.6# L-80 IBT 3654' 11100' 8440' 14754' 8920' 401 sx Class 'G'
6" 4-1/2" 12.6# L-80 IBT 2675' 14754' 8920' 17429' 8900' Uncemented Slotted Liner
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 12187 feet Plugs (measured) ,Ala$~-~a
true vertical 9401 feet A,~chorage
Effective depth: measured 11908 feet Junk (measured) fill at 11908' (05/90)
true vertical 9158 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20" x 30" 8 cu yds concrete 137' 137'
Surface 2694' 13-3/8" 3720 cuft Arcticset II 2721' 2708'
Intermediate 11271' 9-5/8" 1665 cuft 'G', 130 cuft Arcticset I 11298' 8641'
Production
Liner 1375' 7" 402 cuft Class 'G' 10812' - 12187' 8276' - 9401' .~.,
0RIG NAL
Perforation depth: measured Open: 11308' - 11350', 11461' - 11494', 11504' - 11548', 11558' - 11596'
11652' - 11667', 11725' - 11758'
true vertical subsea: 8602' - 8978' (gross interval)
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer NarnelNumben Chris Brown, 564-5582 Prepared By NamelNumber: Terrie Hubble, 564-4628
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
Dan Stone <~ '-"' '"~. ~ Title Engineering Supervisor Date
Commission Use Only
Permit ~up!ber I APINumber I XpprovaIDate I See cover letter
('¢ f~ / ¢ ~> ~ 50-029-20641-01 ...~*'-"/,'/-/-'/~ for other requirements
Conditions of Approval: Samples Required []Yes '[~No Mud Log Required []Yes [~No
Hydrogen Sulfide Measures J~Yes ~ No Directional Survey Required .[~Yes [-'lNo
Required Working Pressure for BOPE []2M; [] 3M; J~,5M; [] 10M; [] 15M
Other:
Origina! $~_~: ,, -., by order of
Approved By David W, Johnstor, Commissioner the commission Date~
Form 10-401 Rev. 12-01-85
Submit In Triplicate
I wen Name:
[ R-20ai
HST Sidetrack Summary
I Type of Well:
Injector
Surface Location: 2089' FSL, 3657' FEL, S32, T12N, R13E, UM
Target Location: 455' FSL, 2182' FEL, S25, T12N, R12E, UM
Bottom Hole Location: 2916' FSL, 3070' FEL, S25, T12N, R12E, UM
I AFE Number: 14P0989
I Estimated Start Date: [ 5/29/98
[Rig: ]Nabors 2ES
I Operating days to complete: I 35
IUD: I17,429' I I TVD: 18,900' ss I I KB Elev. 149.21'
I wen Design: I HST Sidetrack I
Objective:
R-20ai is proposed as a horizontal sidetrack, injection well. Target is to provide injection
support for R-19a, S-43, and S-41 and to expand from solution gas drive to waterflood.
Estimated reserves benefit derived from the injection are 3.0 MMBO.
Formation Tops
TSgr (upthrown)
TSHU (upthrown)
TZ4 (upthrown)
TJB
TZ3 (upthrown)
TZ2 (upthrown)
TSHU (downthrown)
TZ4 (downthrown)
Formation Markers
11214'
11265'
11432'
11493'
11645'
11752'
11834'
17429'
TVD (ss)
8575'
8615'
8700'
8750'
8855'
8910'
8940'
8900'
Directional
I KOP: I11445' MD [
Maximum Hole Angle: 98° through targets
Rig Move Close Approaches: None
Drilling Close Approaches: M-16, 462' separation at 13,269'
R-25a, 220' separation at 11,569'
Casing/Tubing Program
Hole Size Tubular WffFt Grade Conn Length Top Btm
O.D. MD/TVDss MDfrVDss
6" 4-1/2" 12.6# L-80 IBT 3654' 11100'/8440' 14754'/8920'
6" 4-1/2" 12.6# L-80 Slotted IBT 2675' 14754'/8920' 17429'/8900'
Note that this will be a Banzai liner completion, with solid up to 14754', and slotted pipe thereafter,
Production Tubing I I I
NA. 4-1/2" 12.6# L-SO IBT 11050' 26'/-23' 11050'/8402'
Mud Program
Milling Interval: 6% KC1 Milling fluid
Density'PPg I FunnelVis'sec I LSRYP I LSRV [ Pa I APIFL
8.6-8.9 45 - 65 10-18 >35,000 8.5 - 9.0 NC
Hazards/Concerns Maintain YP 45 ~ 65 to insure adequate removal of metal cuttings.
Insure adequate preparation to eliminate metal entering motor and MWD
from mud bypassing solids control equipment.
Production (6" hole) Section: 6 % Quickdriln (viscosified SW)
Density, ppg I FunnelVis, sec I LSRYP I LSRVI pH ] APIFL
8.6 - 8.9 I 45 - 65 10-18 >35,000 8.5 - 9.0 NC
Hazards/Concerns Section will have high torque and require lubricant use. Employ Lubetex
Maximize solids control to keep fluid as clean as possible.
Max mud weight 8.9 ppg.
Cement Calculations
Lead Cement Tail Cement
Casing/Liner Sk / Wt / Yield Sk / Wt / Yield Comments
4-1/2" N/A 401 / 15.7 / 1.19 Class G: 40% excess; Pump time = 4 hr.;
TOC 200' above TOL. Bonzai cement job at 14754'
Volume assumptions: Gauge hole + designated excess; 80' shoe joints; TOC as designated.
Open Hole Logs:
6" Hole
Cased Hole Logs:
Logging Program
MWD Dir/4 phase resistivity
DPC platform Express if MWD unusable
CBL if required
Well Control
Well control equipment consisting of 5000 psi w.p. pipe rams, blind rams, and annular preventer will be
installed and is capable of handling maximum potential surface pressures. Dive,er, BOPE and mud
fluid system schematics on file with AOGCC.
Hazards
The main injection target for this well is the Sag River, although the Ivishak will be penetrated. The
main hazard for this well is the crossing of the Boundary Mapped Fault at the northern boundary of the
field. This is a 300' fault which may cause severe lost circulation and may induce tight hole or other
problems (this fault has been drilled once before and significant lost circulation did not appear). Prepa-
rations should be made to pump LCM when the well is about to cross this major fault.
Sag River
The Sag River can sometimes have very low reservoir pressure in this area (as low as 6. lppg or 2700-
2900psi). Despite this, the pad data sheet indicates that only one well (R-36i) has experienced major lost
circulation in this production interval, most other drilling wells experiencing only minor losses. The area
does have some faults which, if present, are likely to be conductive, and this well does cross to 10-20'
faults while in the target polygon, hence losses should be expected. Productive zone LCM will be em-
ployed to combat this. On the R-36i well, returns were also not obtained while cementing the casing in
place. Losses should be cured before attempting to run casing. Risk of differential sticking is expected
based on offset wells, but should be mitigated by the use of Quikdriln drilling fluid which is solids free.
Ivishak
Differential sticking has occurred frequently in the Ivishak at 9183' TVD. Once the sticking occurs it is
very strong and has created difficulty in fleeing up the drillstring. On R-35A, the sticking was success-
fully alleviated by pumping a 20bbl pill of Liquid Casing, OM Seal, and Barafibre and reducing pump
rate to 5bpm (to reduce ECD). Note however that these wells were drilled using LSND mud; since this
well will employ solids free Quikdriln, this should mitigate the risk of sticking. High torque has been re-
ported on several wells in the production hole, hence some open hole lubrication may be required. The
pad data sheet incorporates wells from R, F and J pad as the bottom hole location of these wells are all in
the same area. Wells from all three pads have experienced problems with bridges, tight hole, differential
sticking, and packing off while in the production interval. This has caused numerous incidents of stuck
logs, casing, and drillstring. This is a high potential stuck pipe area - be alert while driling this interval
and employ frequent reaming if any sign of unstable hole is seen.
Disposal
All cuttings should be hauled to the ball mill at CC-2A for disposal. Haul all drilling and completion
fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal.
Operations Summary
Pre-Rig Procedure ?~i~a~::a n~! ;~,. (-':-a~ '~'~ ~,~,;.,ss~.,,,.~
~nchora~a
NOTE: If any problems with the 9-5/8" packoff are observed during pre-rig work, contact the well-
head manufacturer to initiate repairs and inform the Operations Drilling Engineer.
1. R/U wireline and retrieve SSSV. POOH. If tubing and annulus have not recently (<1 month) been
tested, and tubing has integrity, perform MIT on annulus to 3,000psi.
2. R/U coiled tubing unit. RIH and tag PBTD at 12142'. Spot a balanced cement plug from 12142' (or
~,, PBTD) to -11200'. Attempt to squeeze at least 5bbls of cement to perforations before RIH to
f.Jvg ~-~"~11,480' and circulate out excess cement with contaminant to obtain the required TOC. Highest ac-
~. c, ceptable TOC is 11480 in order to leave room to set whipstock at required depth for kick-off. Cir-
culate the well bottoms up to clean seawater prior to POOH. RD coiled tubing. Let the plug set up,
then tag with slickline.
o
R/U wireline unit. RIH with shifting tool and open Baker sliding sleeve. R/D wireline unit. If sliding
sleeve cannot be opened, RU electric line unit, and RIH with tubing punch assembly. Punch tubing at
+/- 10,627'. RD electric line unit.
.
Circulate seawater through the sleeve or tubing punch until clean returns are obtained. Freeze protect
tubing and annulus to 2,200ft with diesel. Bleed pressures on tubing/annulus. Zero psi on all annuli
required.
5. Set and test BPV. Remove wellhouse and flowlines, level pad, dig out cellar.
Drilling Rig Procedure
.
Prior to rig move, test 9-5/8" packoff to 5,000psi, and function lock down screws (FMC wellhead
representative to do this). If any problems with the 9-5/8" packoff are observed, contact the well-
head manufacturer to initiate repairs.
2. MIRU. Pull BPV and set/test TWCV. ND tree, NU BOP's and test same. Pull TWCV.
.
Circulate out freeze protection and attempt to pull 5-1/2" tubing from PBR. If seals come free from
PBR, retrieve tubing and skip to step 4. If tubing parts, R/H with fishing assembly and retrieve
tubing stub and seals from PBR.
4. RIH with milling assembly and mill/retrieve the remainder of the existing 5-1/2" completion.
.
R/U wireline unit and set EZSV at +/- 11470' (placed for window kick off at 11445'). R/D electric
line unit. RIH with bottom trip whipstock and set on EZSV. Shear off and mill window in 7" at
11445'. POOH.
6. RIH with 6" drilling assembly with 4 phase resistivity LWD and tag TD of new hole. Displace well
to drilling fluid, and drill section to TD of 17429' as per directional plan.
7. If required after review of MWD data, RIH with DPC conveyed Platform Express logging string
and log well from kick off point to TD.
M/U and run -3654' of 4-1/2" solid L80 IBT liner with 2675' of 4-1/2" slotted L80 IBT liner to
hang off depth in 7" of +200' above existing (squeezed) Sag River perforations. Cement liner in
place with the Banzai cementing technique, and set liner hanger/packer.
9. RIH with DPC CBL log and make logging pass over the 4.5" liner to determine condition of ce-
ment job. POOH
10. R/U and run 4.5" L80 completion with SSSV and 7"x4-1/2" production packer, set at _+11,100',
standard WOA tailpipe, and WLEG. Circulate freeze protection to _+2,200'MD. Land completion
and set packer.
Set and test TWCV, ND BOP, NU tree. Pull TWCV and set/test BPV. RDMO.
TREE: 6~
WELLHEAD: McEvoy
R-20ai HST (Proposed Status)
DV packer, 2588'
L-80, BTRS @ 2721'
KB ELEV = 4921'
CB ELEV=1981'
BF ELEV=21 81'
68PPG DIESEL
SSSV LANDING NIPPLE @ 2000'
( SAL-O)¢O = 3 813" ID)
DIESEL FREEZE PROTECTION AT
+/- 2200' MD
7" LINER TOP @
10812'
L-80, BTRS @ 11298'
WHIPSTOCK SET ON EZSV
FOR WINDOW KICK OFF @
11445'
BRIDGE PLUG SET @ 11470'
TOP OF CEMENT @ -11480'
7" BAKER PACKER @
X/XiXN NIPPLES AND
WLEG
4-t/2", 12 6# L80 IBT SOLID
SLOTTED LINER
6" TD @ 17429'
~BANZAI" CEMENT
ISOLATION PACKER
Squeezed perforations from 11308'-
PBTD @ 12142' --
TD @ 1218T
DATE REV BY COMMENTS
osed Status
PRUDHOE BAY LlNIT
WELL: R-2Oai
APl NO: 50-029-20641-01
BP Exploration (Alaska)
TREE:6" DIW R-20ai HST (Pre-rig Status) .B ELEV=467~'
WELLHEAD:McEvoy BF ELEV=21 91'
DV packer, 2588'
L-80, BTRS @ 2721'
- 68PPG DIESEL
SSSV LANCING NIPPLE @ 2082'
( OTIS}(ID = 4562" ID)
DIESEL FREEZE PROTECTION AT
+E 2200' MD
5 1/2", 17#/~ IJ4Sr L-80,
TUBING ID: 4892
CAPACITY: 0232 BBL/FT
__ SLIDING SLEEVE AT-~/-
~ 0(;64' (OT IS XA)
OIL/GAS FLUIDS, 7 34PPG
BAKER PBR ASSY
9 5/8" BOT 3H PACKER,
-- 5 1/2' X NIPPLE, 4562" ID @ 10652'
4.455" ID @ 10693'
T' LINER TOP @ 10812' --
COMMENTS
Pre-riq Status
WELL: R-20i
APl NO: 50-029-20641-00
BP Exploration (Alaska)
I'TREE: 6" McEVOY R 20 KB. ELEV =48.71'
WELLHEAD: McEVOY
BF. ELEV = 21.81'
ACTUATOR: OTIS
'~1- - - Sssv LANDING NIPPLE ] 2082' ]
13-3/8", 72#/ff, (OTIS) (4.562" ID)
L-80, BTRS DV 2588' -
MAX ANGLE: 53°/8200'
5-1/2", 17#/ff, L-80,
IJ4S TUBING (IPC)
TUBING ID: 4.892" i
i CAPAClTY: .0232 BBL/FT
9-5/8" BOT PACKER
( 3H )(3.958" ID) 110,747'1
4 1/2" 12,6 #/ft, L-80 TAILPIPE
TOP OF I I ~ 4 1/2" "X" NIPPLE
7" LINER I 10,8121
I I41/2" "XN" NIPPLE
(OTIS )
9-5/8", 47#/ff, ~ '~ I ~' (BOT SOS)
L-80, BTRS ~ ' (ELMD)110,870'
PERFORATION SUMMARY
REF LOG: SWS - BHCS - 10-22-
sIZE SPF INTERVAL OI~EN/SQZ'D ~ MARKER JOINT I 11,299'
33/8" 6 11,308-11,350' SQZD/4-19-90
2 7/8" 4 11,461 - 11,494' " "
.... 11,501 - 11,549' " "
.... 11,554 - 11,596'
" " 11,604- 11,610' " "
" " 11,616 - 11,626'
" " 11,700 - 11,758' " "
3 3/8" 4 11,308 - 11,350' OPEN/4-24-90
" " 11,461 - 11,480' " "
" 2 11,480 - 11,494' " "
" 4 11,504 - 11,532' " "
I
" I 11,532 - 11,548' "
" 4 11,558- 11,596'
" 2 11,652 - 11,667' " "
II
PBTD ~--
7" , 26 #/ft, L-80, 112.187'1
IJ4S
DATE REV. BY COMMENTS PRUDHOE BAY UNIT
lO-26-81 INITIAL COMPLETION WELL: R-20 (11-31-12-13)
8-6-90 A. TEEL PUT ON MAC APl NO: 50-029- 20641
8/19/91 REVISED, REV. (1/19/94,MPC) SEC 32; TN 12N; RGE 13E
BP Exploration (Alaska)
Anadrill Schlumberger
Alaska District
1111 East 80th' Avenue
Anchorage, AK 99518
(907) 349-4511 Fax 344-2160
DIP, ECTIONAL WELL PLAN for SHARED SERVICES DRILLING
A, I",i'/'. P 2il_L A I( A-DPC
I ! LITY P LAN
NOT APP,'qOVED FOR
EXF_CUTION
PLAN
Well ......... : R-20A (PS)
Field ........ : Prudhoe Bay, R-Pad
Computation..: Minimum Curvature
Units ........ : FEET
Surface Lat..: 70.34934920 N
Surface Long.: 148.90199411 W
Legal Description
Surface ...... : 2089 FSL 3657 FEL
Tie-in survey: 4193 FSL 4218 FEL
BSL/Bonsai Pt: 455 FSL 2182 FEL
BHL .......... : 2916 FSL 3070 FEL
LOCATIONS - ALASKA Zone: 4
X-Coord Y-Coord
S32 T12N R13E UM 635243.00 5978570.00
S31 T12N R13E UM 629358.56 5980569.81
S25 T12N R12E UM ~626503.01 5982063.00
S25 T12N R12E L~4 625573.00 5984509.00
Prepared ..... : 02 Apr 1998
Vert sect az.: 320.00
KB elevation.: 49.51 ft
Magnetic Dcln: +28.000 (E)
Scale Factor.: 0.99992078
Convergence..: +1.03407296
PROPOSED WELL PROFILE
STATION MEASURED INCLN
IDENTIFICATION DEPTH A/gGLE
TSGR (UP THROWN)
TSHU (UP THROWN)
TIE-IN SURVEY 11424.80 35.00
TSAD (UPTHROWN) 11431.55 34.78
DIRECTION VERTICAL-DEPTHS
AZIMUTH TVD SUB-SEA
8349.51 8300.00
8624.51 8575.00
8664.51 8615.00
297.00 8743.99 8694.46
297.00 8~49.51 8700.00
SECTION COORDINATES-FROM
DEPART WELLHEAD
5372.10 2105.85 N 5847.86 W
5375.66 2107.60 N 5851.30 W
A/~ASKA Zone 4 TOOL DL/
X Y FACE 100
629358.56 5980569.81 LS
629355.09 5980571.50 LS
3.25
TOP OF WINDOW
KOP/CURVE 10.00/100
TJB
11445.00 34.34 297.00 8760.58 8711.07 5382.68 2111.07 N 5858.10 W 629348.23 5980574.84 LS 3.25
11450.00 34.18 297.00 8764.72 8715.21 5385.27 2112.34 N 5860.60 W 629345.70 5980576.07 HS 3.25
11493.21 38.50 297.00 8799.51 8750.00 5408.84 2123.97 N 5883.41 W 629322.69 5980587.28 HS 10.00
11500.00 39.18 297.01 8804.80 8755.29 5412.76 2125.90 N 5887.21 W 629318.86 5980589.14 HS 10.00
11600.00 49.18 297.01 8876.42 8826.91 5476.83 2157,51 N 5949.22 W 629256.29 5980619.63 HS 10.00
TZ3 (UP THROWN) 11645.06 53.69 297.02 8904.51 8855.00 5509.26 2173.51 N 5980.60 W 629224,63 5980635.06 HS 10.00
(Anadrill (c)98 R20AP5 3.2C 12:19 PM P)
R-20A (P5) 02 Apr 1998 Pa~e 2 .
PROPOSED WELL PROFILE
m~mmmmm~m~m~mmmmmmm mmmmmmmm mmmmmm
STATION MEASURED INCLN
IDENTIFICATION DEPTH A/gGLE
11700.00 59.18
TZ2 (UP THROWN) 11752.13 64.39
11800.00 69.18
TSHU (DOWN THROWN) 11834.02 72.58
11900.00 79.18
ENMD 10.00/100 CURVE
12000.00 89.18
12007.22 89,90
14189.79 89.90
14200.00 89.93
14226.94 90.00
14300.00 95.26
14337.61 97.96
14530.24 97.96
14600.00 95.52
14700.00 91.95
14754.31 90.00
14800.00 90.17
14900.00 90.55
15000.00 90.93
15100.00 91.31
DIRECTION VERTICAL-DEPTHS
AZIMUTH TVD SUB-SEA
297.02 8934.87 8885.36
297.02 8959.51 8910.00
297.02 8978.37 8928.86
297.02 8989.51 8940.00
297.03 9005.60 8956.09
SECTION
DEPART
5551.39
5593.67
5634.16
5663.74
5722.62
297.03 9015.72 8966.21 5814.10
297.03 9015.78 8966.27 5820.75
297.03 9019.48 8969.97 7830.27
297.85 9019.49 8969,98 7839.69
300.00 9019.51 8970.00 7864.83
302.56 9016.16
303.89 9011.83
303.89 8985.15
308.94 8976.96
316.12 8970.44
320.00 8969.51
321.36 8969.44
324.34 8968.81
327.31 8967.51
330.29 8965.56
8966.65
8962.32
8935.64
8927.45
8920.93
8920.00
8919.93
8919.30
8918.00
8916.05
8913.44
8911.49
8872.00
8870.44
8868.49
15200.00 91.68 333.27 8962.95
15262.3!, 91.91 335.12 8961.00
16447.76 91.91 335.12 8921.51
16500.00 91.51 337.17 8919.95
16600.00 90.73 341.10 8918.00
7933.92
7969.68
8152.97
8220.28
8319.14
8373.39
8419.08
8518.94
8618,41
8717.20
8815.05
8875.43
10019.19
10069.34
10163.78
COORDINATES-FROM ALASKA Zone 4 TOOL DL/
WELLHEAD X Y FACE 100
2194.30 N 6021.37 W 629183.50 5980655.10 HS 10.00
2215.16 N 6062.28 W 629142.22 5980675.22 HS 10.00
2235.14 N 6101.46 W 629102.69 5980694.49 HS 10.00
2249.74 N 6130.08 W 629073.81 5980708.57 HS 10.00
2278.80 N 6187.06 W 629016.32 5980736.60 HS 10.00
2323.95 N 6275.56 W ~28927.02 5980780.14 HS 10.00
2327.23 N 6281.99 W 628920.54 5980783.30 HS 10.00
3319.12 N 8226.16 W 626958.95 5981739.86 88R 0.00
3323.82 N 8235.22 W 626949.81 5981744,40 88R 8.00
3336.85 N 8258.79 W 626926,00 5981757.00 26R 8.00
3374.72 N 8321,14 W 626862.98 5981793.74 26R 8.00
3395.19 N 8352.39 W 626831.37 5981813.63 HS 8.00
3501.56 N 8510.77 W 626671.12 5981917.12 l16R 0.00
3542,67 N 8566.49 W 626614.67 5981957.22 l16R 8.00
3610.08 N 8639.95 W 626540.00 5982023.28 l17R 8,00
3685.81 N 8705.19 W 62~33.42~5982097.82 83R 3.00
3765.50 N 8765.57 W 626411.61 5982176.40 83R 3.00
3848.22 N 8821.74 W 626353.97 5982258.08 83R 3.00
3933.73 N 8873.52 W 626300.65 5982342.64 83R 3.00
4021.80 N 8920.79 W 626251.80 5982429.83 83R 3.00
4077.86 N 8947.90 W 626223.69 5982485.40 MS 3.00
5152.73 N 9446.31 WI625706.00 5983551.00 101R 0.00
5200.48 N 9467.43 W 625684.03 5983598.36 101R 4.00
5293.88 N 9503.03 W 625646,75 5983691.10 101R 4.00
Z_
./'k '--'~'
Z r-i"l-~ '.;~.
·
["23 ~
16700.00 89.95
16800.00 89.17
16900.00 88.39
345.02 8917.41 8867.90 10255.77
348.95 8918.18 8868.67 10344.86
352.87 8920.31 8870.80 10430.62
5389.52 N 9532.16 W
5486.93 N 9554.67 W
5585.63 N 9570.47 W
625615.90 5983786.19 101R 4.00
625591.63 5983883.17 101R 4.00
625574.06 5983981.56 101R 4.00
(Anadrill (c)98 R20AP5 3.2C 12:19 PM P)
R-20A (PS) 02 Apr %998 Pa~e 3
PROPOSED WELL PROFILE
STATION MEASURED INCLN
IDENTIFICATION DEPTH /iNGLE
17000.00 87.62
17100.00 86.87
17177.45 86,29
4-1/2" CASING POINT 17429.34 86.29
TD 17429.34 86.29
TSGR (DOWN THROWN)
TSAD (DOWN THROWN)
TZ3 (DOWN THROWN)
TZ2 (DOWN THROWN)
17429.34 86.29
DIRECTION VERTICAL-DEPTHS
AZIMUTH TVD SUB-SEA
~56.80 8923.78 8874.27
0.73 8928,59 8879.08
3.78 8933.21 8883.70
3,78 8949.51 8900.00
3.78 8949.51 8900.00
3.78
8949.51 8900.00
9074.51 9025.00
9229.51 9180.00
9284.51 9235.00
SECTION
DEPART
10590.51
10647.72
108~9.21
10829.21
10829.21
COORDINATES-FROM
WELLHEAD
5685.15 N 9579.47 W
5784.99 N 9581.62 W
5862.23 N 9578.58 W
6113.05' N 9562.01 W
6113.05 N 9562.01 W
6113.05 N 9562.01 W
ALASKA Zone 4
X Y
625563.27 5984080.89
625559.31 5984180.67
625560.96 5984257.95
625573,00 5984509.00
625573.00 5984509.00
TOOL DL/
FACE 100
101R 4.00
HS 4.00
0.00
0.00
625573.00 5984509.00 0.00
A'r'< A D R i L L A i.'.'.. ",.. >r-' C
NO]- AP?P, OVED FOR
Ex/U-i-I O'N
PLAN 5-
(Anadrill (c)98 R20AP5 3.2C 12:19 PM P)
SHARED SERVICES DRILLING
Harker Identification ND 8KB SECTN INCLN
A) TIE-IN SURVEY 11425 8744 5372 35 O0
B) TOP OF WINDOW 1~445 B761 5383 34 34
C) KOP/CURVE lO.O0/lO0 11450 8765 5385 34 ~8
D) END 10.00/100 CURVE ~2007 90~6 5821 89 90
E) 4-~/2" CASING POINT 17429 8950 10829 86 29
F) TD 17429 8950 ~0829 86 29
Anadri ] ] Schlumberger
R-20A (P5)
VERTICAL SECTION VIEW
Section at: 320.00
TVD Scale · 1 inch = 800 feet
Dep Sca]e.' 1 inch = 800 feet
Drawn · 02 Apr ~998
4800 5200 5600 6000 6400 6800 7200 7600 8000 8400 8800 9200 9600 JO000 10400 JO800 J J200 ~600 ~2000
Section Departure
'~)1 (c)98 R2OAP5 3.26 ~2:20 PN P)
604
35(
24~
6O(
SHARED
SERVTCES
DRTLETNG
Anadr J ] ] Sch ] umberger
, i ! ,
R-eOA (PS)
PLAN VIEW
CLOSURE · ~1349 feet at Azimuth 302.59
.... IDECLINATION.: +28.000 (E)
ISCALE ....... : 1 inch = 1200 feet
.... I DRAWN ....... : 02 Apr 1998
Marker. Identif 1cation MD N/S E/W
A) TIE-IN SURVEY 11425 2106 N 5848 W
TOP OF WINDOW 11445 2111 N 585B W
KOP/CURVE ,0.00/100 1,450 21,2 N 5861 W
D) END 10.00/100 CURVE 12007 2327 N 6282 W
E) 4-,/2" CASING POINT ,7429 6113 N 9562 W
F) TO t7429 6,13 N 9562W
_ ~x,, N<)-F/', P*Ft: 3\/E ) FO 2 1
E).rCL-FI C~q
KB
10200 9600 9000 8400 7800 7200 6600 6000 5400 4800 4200 3600 3000 2400 1800 1200 600 0 600
<- WEST' EAST ->
r'~]! {c}98 fl2oAP5 3.2c 12;21 PM p) ......
Alaska
hared
ervices
rilling
The attached work cannot commence without AOGCC approval!
Application (check one)
"~~------~ Drilling / Sidetrack Permit
~'] Sundw Application
Reason for Sundry (check all that apply)
Change to submitted Drilling Permit
__ Change to approved Drilling Permit
Abandon Wellbore
Workover of Injection Well
Reenter Suspended Well
Suspend Wellbore
Change Well Type (Injector, Producer)
Extending Expired Permit
Other
Brief Summary of Changes (if any):
Application Submittal
Documentation Prepared by:
Permit Application Attached:
Reviewed by:
Submitted to AOGCC:
Approval to Proceed
IApproYed AOGCC Permits Received:
IApproval to Commence Oporations:
Op~X~,ons Drilling Engineer
Technical Assistant
/~ling. Engir~e/er //
Technical Assistant
Technical Assistant
Date
Date
Dat2 t~' g)
Date
Date
Sr. Drilling Engineer Date
STATE OF ALASKA
AI_~SKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
Type of Request: ~ Abandon ~ Suspend ;~ Plugging ~_~ Time Extension [--] Perforate
~ Alter Casing ~ Repair Well ~ Pui; T, ,bing ~ Variance I~ Other
~ Change Approved Program ~ Operation Shutdown ~ Re-Enter busper~ded Well ~ Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3190' SNL, 3658' WEL, SEC. 32, T12N, R13E, UM
At top of productive interval
N/A - Water & Gas Injection Well
At effective depth
975' SNL, 4450' WEL, SEC. 31, T12N, R13E, UM
At total depth
901' SNL, 4563' WEL, SEC. 31, T12N, R13E, UM
Type of well:
~ Development
~ Exploratory
i~ Stratigraphic
j~;~] Service
.
Datum Elevation (DF or KB)
KBE = 48.71' AMSL
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
R-20i
9. Permit Number
81-120
10. APl Number
50-029-20641
1. Field and Pool
Prudhoe Bay Field / Prudhoe Bay
Pool
12. Present well condition summary
Total depth: measured 12187 feet
true vertical 9401 feet
Effective depth: measured 11908 feet
true vertical 9158 feet
Casing Length
Structural
Conductor 110'
Surface 2694'
Intermediate 11271'
Production
Liner 1375'
Size
Plugs (measured)
Junk (measured)
fill at 11908' (05/90)
Cemented MD TVD
20" x 30"
13-3/8"
9-5/8"
8 cu yds concrete 137'
3720 cu ft Arcticset II 2721'
1665 cu ft 'G', 130 cuft Arcticset I 11298'
7" 402 cu ft Class 'G' 10812' - 12187'
137'
2708'
8641'
8276'-9401'
Perforation depth:
measured Open: 11308'- 11350', 11461'-11494', 11504'- 11548', 11558'- 11596'
11652' - 11667', 11725' - 11758'
subsea: 8602' - 8978' (gross interval)
true vertical
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 to 10727' with 4-1/2" tailpipe to 10892'
Packers and SSSV (type and measured depth) 9-5/8" packer at 10747'; 5-1/2" ISSSV at 2072'
13. Attachments [~ Description summary of proposal [] Detailed operations program [] BOP sketch
14. Estimated date for commencing operation
May 5, 1998
16. If proposal was verbally approved
Name of approver
Date approved
Contact Engineer Name/Number: Chris Brown, 564-5582
15. Status of well classifications as:
~ Oil ~ Gas F-i Suspended
Service Water & Gas Injector
Prepared By Name/Number: Terrie Hubble, 564°4628
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
Dan Stone · Title Engineering Supervisor
Commission Use Only
Date
Conditions of Approval: Notify Commission so representative may witness
Plug integrity __ BOP Test __ Location clearance __
Mechanical Integrity Test__ Subsequent form required 10-
I Approval No. ~?,~////~
Approved by order of the Commission
Form 10-403 Rev. 06/15/88
Commissioner
Date 07: ~,,~.~./3.
Submit In Triplicate
DATE ICHECK NO. I
H 13 G 0 7 9 o~/~7/~ oo_~3~o7,
VENDOR Ai A.~I,(.A.~Ti zl. (lQ
DATE INVOICE ! CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
032498 CKO32498A 100. O0 i.00. O0
HANDL[NQ INST' S/H TERRI HUBBLE X 46~8
THE ATTACHED CHECK IS IN PAYMENT FOR iY~:MS DESCRIBED ABOVE.m[l]~_,1~ i ~ ~ ,~r, ~ ~ ~r,
· WELL PERMIT CHECKLIST COMPANY
oo,_ ......
ADMINI STR AT_.!._O..N_
ENGINEERING
WELL NAME F I~L.,L \¢x,-20 J/'~ PROGRAM: exp [] dev [] redrll ,l~serv,~'wellbore segl ann disposal para
GEOL AREA . ~ C/O tINIT# // ~ ~-('~ ON/OFF St'tORE ___ ~.?~
APPR DA,fi!:
I l't'fr]~il tee altached
2 l ease lu.,nff:~el appropriate. ~2 N
3 Unique well name and nurnbel. (~N
4 Well Iocaled in a defined pool ........ (~ N
5 Well Iocaled proper distance from drilling unil boundary ~-~ N
6 Well Iocaled proper dislance from other wells . . _~ N
7 Sufficient acreage available in drilling unit C___'t~ N
8 If dewated, is wellbore plat ir~cltJded i~ N
90peralor orfly affected pady. ~i' I,,I
10 ()peralor has appropriate bond in force. N
11 F-'errrlil can be issued wilhout conservation order ~ N
12 Permit can be issued wilhout administrative apploval ~ N
1:~ (:a~ l)(:~r]~d be approved before 15-day wait N
14 C(u~ductol sh'mg provided
15 St~rface casing protects all known USDWs. . .
16 CKI'[' vol adequate Io circulate on conductor & sulf csg
17 CMl vol adequale Io tie-in long string Io surf csg ....
18 CM'I will cover' all known produclive horizons...
19 Casing designs adequate for C, T. B & permafrost
20 Adequate tankage or reserve pit ..............
2'1 II a re.drill, has a 10-403 for abandonrnenl been approved.
22 Adeqt~ale wellbore sepalalion proposed . .
23 If d/verier required, does il rneet regulations
24 l)~ilhng fhmt program ,~;ct~enlatic & eq~ip Imf arleqt~ate (~N
25 [.¢f )i 'i! r,. do they rnee. t re.clulatioll
20 BC)PE p~ess rating appropriate: lesl Io ~¢;x,,'~ .... psig
27 Choke manifold complies w/APl RP-53 (May 84)
28 Work will occur without operation shutdown (~.)N
29 I.,; pleserl(:e of tt:.S gas probable.
t~EMARKS
GEOLOGY
30 F'ernlit can be issued w/o hydrogen sulfide m~ Y N
31 Data presenled on potenlial ove~es Y N
32 Sels~nic analysis or--ones Y N
33 ~ifoff-shore). . Y N
II ARPR DA"IE ..... 3,1 acl ~a~]~e/phone for weeklyprogress reports Y N
I~__ .......... .... ',,)'u.(~/:'if~, . :
ENGINEERING C_;_OM___ ~r~_s_s_ I ON
,.IDt'I..-¢ ' -- RNC~
co coq
Commentslln~,tructions
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
* ALASKA COMPUTING CENTER
.
....... SCHLUMBERGER .......
. ............................
COMPANY NAME : BP EXPLORATION (ALASKA)
WELL NAME : R-20A
FIELD NAME : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 500292064101
REFERENCE NO : 98623
R, CE VED
F~B 04 ~999
Alaska Oil & Gas Co~,~.
LIS T~-p~&/Verification Listing
Schlumberger Alaska Computing Center
25-JAN-19~9 14: 09
PAGE:
**** REEL H~ER ****
SERVICE NAME : EDIT
DATE : 99/01/25
ORIGIN · FLIC
REEL NAME : 98623
CONTINUATION # :
PREVIOUS REEL
CO~E4ENT · BP EXPLORATION, R-2OA, PRUDHOE BAY, API #50-029-20641-01
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 99/01/25
ORIGIN . FLIC
TAPE NAME . 98623
CONTINUATION # : 1
PREVIOUS TAPE :
COGENT : BP EXPLORATION, R-2OA, PRUDHOE BAY, API #50-029-20641-01
TAPE HEADER
PR UDHOE BAY
MWD/MAD LOGS
NELL NAME:
API NUMBER:
OPERA TOR :
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DA TA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
BIT RUN 1
.........
98623
NUTTER
WHIPP
SECTION:
TO~NSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
R-20A
500292064101
BP Exploration (Alaska)
SCHLUMBERGER W~LL SERVICES
25-JAN-99
BIT RUN 2 BIT RUN 3
32
12N
13E
49.77
48.37
21.81
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
13.375 2721.0
12.250 9.675 11298.0
LIS Tape~IVerification Listing
Schlumberger Alaska Computing Center
PAGE:
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 52
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 19
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 4000264 O0 000 O0 0 1 1 1 4 68 0000000000
FET MWD HR 4000264 O0 000 O0 0 1 1 1 4 68 0000000000
ROP MWD FPHR 4000264 O0 000 O0 0 1 1 1 4 68 0000000000
GR MWD GAPI 4000264 O0 000 O0 0 1 1 1 4 68 0000000000
RPD MWD OH~k4 4000264 O0 000 O0 0 1 1 i 4 68 0000000000
RPM MWD 0I~4~ 4000264 O0 000 O0 0 1 1 1 4 68 0000000000
RPS MWD OH2V~ 4000264 O0 000 O0 0 1 1 1 4 68 0000000000
RPX MWD 0H~4~4000264 O0 000 O0 0 1 ! 1 4 68 0000000000
RPXXMWD OP~4~ 4000264 O0 000 O0 0 1 1 1 4 68 0000000000
RAD MWD OHI~ 4000264 O0 000 O0 0 1 1 1 4 68 0000000000
RAM MWD OP~4~ 4000264 O0 000 O0 0 1 1 1 4 68 0000000000
RAS MWD OH~g~ 4000264 O0 000 O0 0 1 ! i 4 68 0000000000
RAX MWD OPEV~l4000264 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
LIS TapS'verification Listing
Schlumberger Alaska Computing Center
DEPT. 16884.500 FET.MWD -999.250 ROP.MWD
RPD.MWD -999.250 RPM. MWD -999.250 RPS.MWD
RPXX.MWD -999.250 RAD.MWD -999.250 ~.MWD
RAX.MWD -999.250
12.640
-999.250
-999.250
GR.MWD
RPX.MWD
RAS.MWD
DEPT. 11346.000 FET.MWD -999.250 ROP.MWD -999.250 GR.MWD
RPD.MWD -999.250 RPM. MWD -999.250 RPS.MWD -999.250 RPX.MWD
RPXX.MWD -999.250 R_AD.MWD -999.250 RAM. MWD -999.250 RAS.MWD
RAX.MWD -999.250
PAGE:
-999.250
-999.250
-999.250
58.352
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION · O01CO1
DATE : 99/01/25
~REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE · FLIC
VERSION · O01CO1
DATE : 99/01/25
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NIIMBER 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: O. 5000
FILE S~Y
VENDOR TOOL CODE START DEPTH STOP DEPTH
iBGD 11343.5 12776.0
$
LOG HEADER DATA
DA TE LOGGED: 15 -JUL - 98
SOFT~gARE :
SURFACE SOFTWARE VERSION: 5 iA 12
DOWNHOLE SOFTWARE VERSION: 5.0 53
_
LIS Tape'verification Listing
Schlumberger Alaska Computing Center
25-JA~19~14:09
PAGE:
DATA TYPE (MEMORY or REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
MEMORY
16885.0
11346.0
16885.0
38.3
94.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAMMA RAY
IMP IMPULSE RESISTIVITY
$
TOOL NUMBER
GR
IMPULE-475 15
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
6.000
12187.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
QUIKDRILN
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
AJaR FREQUENCY (HZ):
20000
REMARKS:
************ 6 inch Hole Section *************
Depth interval 11397 to 12776 ft.
MWD s/n 015 software ver 5.0 53 _
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 51.49 ft
Gamma Ray - 53.66 ft
Resistivity - 46.29 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
Data corresponding to bit depth of 12214 to
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-JAN-199~ 14:09
PAGE:
12240 ft is washed down, not from drilling.
********** 6 inch Hole Section *************
**************** RUN2 *********************
Depth interval 12776 to 12826 ft.
MWD s/n 052 software vet 5.0 53 _
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.07 ft
Gamma Ray - 56.24 ft
Resistivity - 48.87 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
**************** RUN 3 *********************
Depth interval 12826 to 13544 ft.
MWD s/n 052 software vet 5.0 53
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.41 ft
Gamma Ray - 53.58 ft
Resistivity - 46.21 ft
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
**************** RUN4 *********************
Depth interval 13544 to 15063 ft.
MWD s/n 015 software ver 5.0 53
_
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 53.29 ft
Gamma Ray - 55.64 ft
Resistivity - 48.09 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
Depth interval 15063 to 16885 ft.
MWD s/n 015 software ver 5.0 53
_
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.91 ft
Gamma Ray - 57.08 ft
Resistivity- 49.71 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
Thank you for using Schlumberger.
THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #1.
$
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-JAN-1999 14:09
PAGE:
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
* * SET TYPE - 64EB * *
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NTJMB SAMP ELEM CODE (HEX)
DEPT FT 4000264 O0 000 O0 0 2 1 1 4 68 0000000000
TVDE LW1 FT 4000264 O0 000 O0 0 2 1 1 4 68 0000000000
ROP5 LW1 F/HR 4000264 O0 000 O0 0 2 1 1 4 68 0000000000
MTEMLW1 DEGF 4000264 O0 000 O0 0 2 1 1 4 68 0000000000
TABR LW1 SEC 4000264 O0 000 O0 0 2 1 1 4 68 0000000000
AIOH LW1 OH~4M4000264 O0 000 O0 0 2 1 1 4 68 0000000000
A16H LW1 OtflviM 4000264 O0 000 O0 0 2 1 1 4 68 0000000000
A22H LW1 OtflviM 4000264 O0 000 O0 0 2 1 1 4 68 0000000000
A28H LW1 OI~V~44000264 O0 000 O0 0 2 1 1 4 68 0000000000
A31H LW1 OI4ffff4 4000264 O0 000 O0 0 2 1 1 4 68 0000000000
A34H LW1 0tfl~44000264 O0 000 O0 0 2 1 1 4 68 0000000000
PiOH LW1 OHY~I 4000264 O0 000 O0 0 2 1 1 4 68 0000000000
P16H LW1 OHF~4 4000264 O0 000 O0 0 2 1 1 4 68 0000000000
P22H LW1 OHfivk4 4000264 O0 000 O0 0 2 1 1 4 68 0000000000
P28H LW1 OH~k4 4000264 O0 000 O0 0 2 1 1 4 68 0000000000
P31H LW1 OH~4M4000264 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
LIS Tape"Verification Listing
Schlumberger Alaska Computing Center
25-JAN-1999 14:09
PAGE
DEPT. 11343 . 500 TVDE. LW1
TABR.LW1 O. 000 AIOH.LW1
A28H. LW1 O. 169 A3 IH. LW1
P16H. LW1 O. 180 P22H. LW1
DEPT. 12776. 000 TVDE.LW1
TABR. LWl 6100. 000 A1 OH. LW1
A28H. LW1 4 . 732 A31H. LW1
P16H. LW1 4.217 P22H. LW1
8717. 734 ROP$.LW1
0.100 A16H. LW1
300. 000 A34H.LW1
O. 249 P28H. LW1
12775. 992 ROP$. LW1
4. 446 A16H. LW1
4. 725 A34H. LW1
4. 383 P28H. LW1
-999. 250 MTEM. LW1
O. 100 A22H. LW1
300. 000 PiOH. LW1
O. 218 P3 iH. LW1
24. 658 MTEM. LW1
4. 575 A22H. LW1
4 . 720 P1 OH. LW1
4. 450 P31H. LW1
119. 012
0.100
O. 158
0.153
130.000
4.682
3.964
4.470
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE ·FLIC
VERSION ·O01CO1
DATE : 99/01/25
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE · FLIC
VERSION · O01CO1
DATE · 99/01/25
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
FILE HEADER
FILE NUMBER 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: O. 5000
FILE SUM2VARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
~D 12688.5 12826.5
$
LOG HEADER DATA
DATE LOGGED: 15-JUL-98
SOF~gARE:
SURFACE SOFTWARE VERSION: 5 iA 12
LIS Ta~e JVerification Listing
Schlumberger Alaska Computing Center
25-JAN-19~ 14: 09
PAGE:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME)
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) ~
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
5.0 53
_
MEMORY
16885.0
11346.0
16885.0
38.3
94.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
GR GAF~iA RAY
IMP IMPULSE RESISTIVITY
$
TOOL NUMBER
...........
GR
IMPULE-475 15
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN) '.
DRILLERS CASING DEPTH (FT) :
6. 000
12187.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHF~4) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
QUIKDRILN
NEUTRON TOOL
MATRIX '.
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
REMARKS:
************ 6 inch Hole Section *************
******************** RUN i *******************
Depth interval 11397 to 12776 ft.
MWD s/n 015 software ver 5.0_53
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 51.49 ft
Gamma Ray - 53.66 ft
Resistivity - 46.29 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-JAN-1999 14:09
PAGE:
10
Data corresponding to bit depth of 12214 to
12240 ft is washed down, not from drilling.
********** 6 inch Hole Section *************
**************** RUN 2 *********************
Depth interval 12776 to 12826 ft.
MWD s/n 052 software ver 5.0 53 _
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.07 ft
Gamma Ray - 56.24 ft
Resistivity - 48.87 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
**************** RUN 3 *********************
Depth interval 12826 to 13544 ft.
MWD s/n 052 software vet 5.0 53 _
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.41 ft
Gamma Ray - 53.58 ft
Resistivity - 46.21 ft
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
**************** RUN4 *********************
Depth interval 13544 to 15063 ft.
MP~ s/n 015 software vet 5.0 53 _
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 53.29 ft
Gamma Ray - 55.64 ft
Resistivity - 48.09 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
Depth interval 15063 to 16885 ft.
MWD s/n 015 software vet 5.0 53
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.91 ft
Gamma Ray - 57.08 ft
Resistivity - 49.71 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
Thank you for using Schlumberger.
THIS FILE CONTAINS THE RAW DATA FOR BIT RUN#2.
$
LIS Ta~Verification Listing
Schlumberger Alaska Computing Center
25-JAN-1999 14: 09
PAGE:
11
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
* * SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 4000264 O0 000 O0 0 3 1 1 4 68 0000000000
TVDE LW2 FT 4000264 O0 000 O0 0 3 1 1 4 68 0000000000
ROP$ LW2 F/HR 4000264 O0 000 O0 0 3 1 1 4 68 0000000000
MTEMLW2 DEGF 4000264 O0 000 O0 0 3 1 1 4 68 0000000000
TABR LW2 SEC 4000264 O0 000 O0 0 3 1 1 4 68 0000000000
AIOH LW2 Otff4M4000264 O0 000 O0 0 3 1 1 4 68 0000000000
A16H LW2 0P~4~4000264 O0 000 O0 0 3 1 1 4 68 0000000000
A22H LW2 0t~4M4000264 O0 000 O0 0 3 1 1 4 68 0000000000
A28H LW2 0H~4~i4000264 O0 000 O0 0 3 1 1 4 68 0000000000
A31H LW2 OHNk44000264 O0 000 O0 0 3 1 1 4 68 0000000000
A34H LW2 0I~4M4000264 O0 000 O0 0 3 1 1 4 68 0000000000
PIOH LW2 0H~4000264 O0 000 O0 0 3 1 1 4 68 0000000000
P16H LW2 Otk4M4000264 O0 000 O0 0 3 1 1 4 68 0000000000
P22H LW2 Otflv~l 4000264 O0 000 O0 0 3 1 1 4 68 0000000000
P28H LW2 OH~4M 4000264 O0 000 O0 0 3 1 1 4 68 0000000000
P31H LW2 OH~4~ 4000264 O0 000 O0 0 3 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
PAGE: 12
** DATA **
DEPT. 12688. 500 TVDE. LW2
TABR. LW2 O. 000 AiOH.LW2
A28H. LW2 3. 432 A31H. LW2
P16H. LW2 3. 029 P22H. LW2
DEPT. 12826. 500 TVDE. LW2
TABR. LW2 7930. 000 A1 OH. LW2
A28H. LW2 3 . 851 A31H. LW2
P16H. LW2 4. 068 P22H. LW2
9020. 926 ROPS. LW2
3 . 198 A16H. LW2
3 . 531 A34H. LW2
3. 051 P28H. LW2
9020 . 900 ROPS. LW2
3.850 A16H. LW2
3 . 849 A34H. LW2
4.172 P28H. LW2
-999. 250 MTEM. LW2
3. 274 A22H. LW2
3. 623 P1 OH. LW2
3 . 181 P31H. LW2
8. 314 ~FfEM. LW2
3. 831 A22H. LW2
3 . 848 PiOH. LW2
4. 217 P31H. LW2
128.949
3.313
2.959
3.330
130.004
3.840
3.920
4.225
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/01/25
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE · FLIC
VERSION · O01CO1
DATE · 99/01/25
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: O. 5000
FILE SU~k4ARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
~4~D 12769.5 13544.5
$
LOG HEADER DATA
DATE LOGGED: 15-JUL- 98
SOF~FARE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-JAN-1999 14:09
PAGE: 13
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
5 iA 12
5.0 53
_
MEMORY
16885.0
11346.0
16885.0
38.3
94.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAi~MA RAY
IMP IMPULSE RESISTIVITY
$
TOOL NUMBER
...........
GR
IMPULE-475 15
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
6.000
12187.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OH~4) .AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
QUIKDRILN
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
REMARKS:
************ 6 inch Hole Section *************
******************** RUN1 *******************
Depth interval 11397 to 12776 ft.
MWD s/n 015 software ver 5.0_53
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 51.49 ft
Gamma Ray - 53.66 ft
Resistivity - 46.29 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
LIS T~p~t Verification Listing
Schlumberger Alaska Computing Center
25-JAN-1999 14: 09
PAGE:
14
mud weight.
Data corresponding to bit depth of 12214 to
12240 ft is washed down, not from drilling.
********** 6 inch Hole Section *************
Depth interval 12776 to 12826 ft.
MWD s/n 052 software vet 5.0 53 _
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.07 ft
Gamma Ray - 56.24 ft
Resistivity - 48.87 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
Depth interval 12826 to 13544 ft.
MWD s/n 052 software ver 5.0 53
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.41 ft
Gamma Ray - 53.58 ft
Resistivity- 46.21 ft
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
Depth interval 13544 to 15063 ft.
MWD s/n 015 software ver 5.0 53
IAB s/n ENPO02 software version !.lOc
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 53.29 ft
Gamma Ray- 55.64 ft
Resistivity - 48.09 ft
IAB - 1 f t
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
Depth interval 15063 to 16885 ft.
MWD s/n 015 software ver 5.0 53
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.91 ft
Gamma Ray - 57.08 ft
Resistivity- 49.71 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
Thank you for using Schlumberger.
THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #3.
LIS Tsp~Verification Listing
Schlumberger Alaska Computing Center
PAGE:
15
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NLrMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 4000264 O0 000 O0 0 4 1 1 4 68 0000000000
TVDE LW3 FT 4000264 O0 000 O0 0 4 1 1 4 68 0000000000
ROP5 LW3 F/HR 4000264 O0 000 O0 0 4 1 t 4 68 0000000000
MTEM LW3 DEGF 4000264 O0 000 O0 0 4 1 1 4 68 0000000000
TABR LW3 SEC 4000264 O0 000 O0 0 4 1 1 4 68 0000000000
AiOH LW3 OHIZ~I4000264 O0 000 O0 0 4 1 1 4 68 0000000000
A16H LW3 OH~k~ 4000264 O0 000 O0 0 4 1 ! 4 68 0000000000
A22H LW3 0H~94 4000264 O0 000 O0 0 4 1 1 4 68 0000000000
A28H LW3 OPiNk44000264 O0 000 O0 0 4 1 1 4 68 0000000000
A31H LW3 OH~k4 4000264 O0 000 O0 0 4 1 1 4 68 0000000000
A34H LW3 OH~4~ 4000264 O0 000 O0 0 4 1 1 4 68 0000000000
PiOH LW3 OHI~I 4000264 O0 000 O0 0 4 1 1 4 68 0000000000
P16H LW3 OHNfl~4000264 O0 000 O0 0 4 1 1 4 68 0000000000
P22H LW3 OHIO4 4000264 O0 000 O0 0 4 1 1 4 68 0000000000
P28H LW3 OHI~4 4000264 O0 000 O0 0 4 1 1 4 68 0000000000
P31H LW3 OHNk4 4000264 O0 000 O0 0 4 1 1 4 68 0000000000
LIS Ta~e Verification Listing
Schlumberger Alaska Computing Center
25-JAN-19~ 14: 09
PAGE:
16
** DATA **
DEPT. 12769. 500 TVDE. LW3
TABR.LW3 O. 000 Ai OH.LW3
A28H. LW3 4. 059 A31H. LW3
P16H. LW3 3 . 756 P22H. LW3
DEPT. 13544. 500 TVDE. LW3
TABR. LW3 5740. 000 A1 OH. LW3
A28H. LW3 3 . 523 A31H. LW3
P16H. LW3 3. 554 P22H. LW3
9020. 934 ROP5. LW3
3.975 A16H.LW3
4. 050 A34H.LW3
3. 942 P28H. LW3
9008. 268 ROPS. LW3
3. 658 A16H. LW3
3.509 A34H.LW3
3. 603 P28H. LW3
-999. 250 MTEM. LW3
4. O17 A22H. LW3
4. 042 P1 OH. LW3
4. 048 P31H. LW3
46. 997 MTEM. LW3
3. 560 A22H. LW3
3 . 496 PiOH.LW3
3 . 623 P31H. LW3
216. 422
4. 051
3. 471
4. 106
225. 006
3. 535
3. 481
3. 627
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE · 99/01/25
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE · FLIC
VERSION : O01CO1
DATE · 99/01/25
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
FILE HEADER
FILE NUMBER 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: O. 5000
FILE S~Y
VENDOR TOOL CODE START DEPTH STOP DEPTH
..........
MWD 13442.0 15063 . 5
$
LOG HEADER DATA
DATE LOGGED: 15-JUL-98
SOF~ARE :
LIS Ta~ ~Verification Listing
Schlumberger Alaska Computing Center
PAGE:
17
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
5 IA 12
5.0 53
_
MEMORY
16885.0
11346.0
16885.0
38.3
94.7
TOOL STRING (TOP TO BOTTOM)
VE~NDOR TOOL CODE TOOL TYPE
GR GAMMA RAY
IMP IMPULSE RESISTIVITY
$
TOOL NUMBER
GR
IMPULE-475 15
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
6. 000
12187.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OH~4M) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
QUIKDRILN
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN)
EWR FREQUENCY (HZ)
20000
REMARKS:
************ 6 inch Hole Section *************
******************** RUN1 *******************
Depth interval 11397 to 12776 ft.
M~ s/n 015 software ver 5.0 53 _
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 51.49 ft
Gamma Ray - 53.66 ft
Resistivity - 46.29 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
LIS T~p~"Verification Listing
Schlumberger Alaska Computing Center
PAGE:
18
mud weight.
Data corresponding to bit depth of 12214 to
12240 ft is washed down, not from drilling.
********** 6 inch Hole Section *************
**************** RUN 2 *********************
Depth interval 12776 to 12826 ft.
MWD s/n 052 software ver 5.0 53 _
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.07 ft
Gamma Ray - 56.24 ft
Resistivity - 48.87 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
**************** RUN 3 *********************
Depth interval 12826 to 13544 ft.
MWD s/n 052 software ver 5.0 53 _
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.41 ft
Gamma Ray - 53.58 ft
Resistivity - 46.21 ft
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
**************** RUN4 *********************
Depth interval 13544 to 15063 ft.
MWD s/n 015 software ver 5.0 53 _
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 53.29 ft
Gamma Ray - 55.64 ft
Resistivity - 48.09 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
Depth interval 15063 to 16885 ft.
MWD s/n 015 software ver 5.0 53 _
IAB s/n ENPO02 software version !.!Oc
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.91 ft
Gamma Ray - 57.08 ft
Resistivity - 49.71 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
Thank you for using Schlumberger.
THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #4.
LIS TaP~ 'Verification Listing
Schlumberger Alaska Computing Center
25-J~iN-193~'14:09
PAGE:
19
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
* * SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NtrM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 4000264 O0 000 O0 0 5 1 1 4 68 0000000000
TVDE LW4 FT 4000264 O0 000 O0 0 5 1 1 4 68 0000000000
ROP5 LW4 F/HR 4000264 O0 000 O0 0 5 ! 1 4 68 0000000000
MTEM LW4 DEGF 4000264 O0 000 O0 0 5 1 1 4 68 0000000000
TABR LW4 SEC 4000264 O0 000 O0 0 5 t 1 4 68 0000000000
AiOH LW4 OH~49f4000264 O0 000 O0 0 5 1 1 4 68 0000000000
A16H LW4 OH~IM 4000264 O0 000 O0 0 5 ! 1 4 68 0000000000
A22H LW4 OP~4M 4000264 O0 000 O0 0 5 1 1 4 68 0000000000
A28H LW4 OHMM 4000264 O0 000 O0 0 5 1 1 4 68 0000000000
A31H LW4 OH~4M 4000264 O0 000 O0 0 5 1 1 4 68 0000000000
A34H LW4 OPff~M4000264 O0 000 O0 0 5 1 1 4 68 0000000000
PIOH LW4 OI~4M 4000264 O0 000 O0 0 5 1 1 4 68 0000000000
P16H LW4 OH~4~ 4000264 O0 000 O0 0 5 1 1 4 68 0000000000
P22H LW4 Otk4M 4000264 O0 000 O0 0 5 i 1 4 68 0000000000
P28H LW4 OHNfl~4000264 O0 000 O0 0 5 ! 1 4 68 0000000000
P31H LW4 OH~4M 4000264 O0 000 O0 0 5 1 1 4 68 0000000000
LIS Ta'p~ ~Verification Listing
Schlumberger Alaska Computing Center
PAGE:
2O
* * DATA * *
DEPT. 13442. 000 TVDE. LW4
TABR. LW4 O. 000 A1 OH. LW4
A28H. LW4 O. 890 A31H. LW4
P16H. LW4 2.047 P22H. LW4
DEPT. 15063. 500 TVDE. LW4
TABR. LW4 4193 . 281 A1 OH. LW4
A28H. LW4 5. 767 A31H. LW4
P16H. LW4 5. 655 P22H. LW4
9008. 525 ROPS. LW4
0.139 A16H. LW4
1 . 887 A34H. LW4
1.919 P28H.LW4
8958. 025 ROPS. LW4
5.571 A16H.LW4
5.762 A34H. LW4
5. 685 P28H. LW4
- 999. 250 MTE~. LW4
O. 197 A22H. LW4
7.315 P1 OH. LW4
O. 933 P31H. LW4
61. 027 MTEM. LW4
5. 606 A22H. LW4
5. 758 P1 OH. LW4
5. 644 P31H. LW4
208. 858
O. 341
O. 871
O. 758
225.005
5.703
5.553
5.616
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE · 99/01/25
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 99/01/25
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: O. 5000
FILE SUN, VARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
MWD 14974.5 16884 . 5
LOG HEADER DATA
DATE LOGGED: 15-JUL-98
SOF~'IARE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
25-JAN-1999 14: 09
PAGE
21
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
5 IA 12
5.0 53
MEMORY
16885.0
11346.0
16885.0
38.3
94.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAFgW~ RAY
IMP IMPULSE RESISTIVITY
$
TOOL AvUMBER
...........
GR
IMPULE-475 15
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
6. 000
12187.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
QUIKDRILN
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20000
REMARKS:
************ 6 inch Hole Section *************
******************** RUN1 *******************
Depth interval 11397 to 12776 ft.
MWD s/n 015 software ver 5.0 53 _
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 51.49 ft
Gamma Ray - 53.66 ft
Resistivity - 46.29 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
LIS Tape-verification Listing
Schlumberger Alaska Computing Center
PAGE:
22
mud weight.
Data corresponding to bit depth of 12214 to
12240 ft is washed down, not from drilling.
********** 6 inch Hole Section *************
**************** RUN 2 *********************
Depth interval 12776 to 12826 ft.
MWD s/n 052 software vet 5.0 53
_
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.07 ft
Gamma Ray- 56.24 ft
Resistivity - 48.87 ft
IAB - 1 f t
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
Depth interval 12826 to 13544 ft.
MWD s/n 052 software ver 5.0 53 _
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey- 54.41 ft
Gamma Ray - 53.58 ft
Resistivity- 46.21 ft
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
Depth interval 13544 to 15063 ft.
M~ s/n 015 software ver 5.0 53
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 53.29 ft
Gamma Ray- 55.64 ft
Resistivity - 48.09 ft
IAB - 1 f t
Gamma Ray corrected for bit size and
mud weight.
********** 6 inch Hole Section *************
Depth interval 15063 to 16885 ft.
MWD s/n 015 software ver 5.0 53
IAB s/n ENPO02 software version 1.10c
IDEAL software version 5 la 12
Sensor to bit lengths are as follows:
Survey - 54.91 ft
Gamma Ray - 57.08 ft
Resistivity- 49.71 ft
IAB - 1 ft
Gamma Ray corrected for bit size and
mud weight.
Thank you for using Schlumberger.
THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #5.
LIS Ta~e~Verification Listing
Schlumberger Alaska Computing Center
PAGE:
23
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 4000264 O0 000 O0 0 6 1 1 4 68
TVDE LW5 FT 4000264 O0 000 O0 0 6 1 1 4 68
ROP5 LW$ F/HR 4000264 O0 000 O0 0 6 1 1 4 68
MTEMLW5 DEGF 4000264 O0 000 O0 0 6 1 1 4 68
TABR LW$ SEC 4000264 O0 000 O0 0 6 1 1 4 68
AiOH LW5 OPi~4~4000264 O0 000 O0 0 6 1 1 4 68
A16H LW5 OHN~I 4000264 O0 000 O0 0 6 1 1 4 68
A22H LW5 OH~4~ 4000264 O0 000 O0 0 6 1 1 4 68
A28H LW5 0H~4~4000264 O0 000 O0 0 6 1 1 4 68
A31H LW5 0~4000264 O0 000 O0 0 6 1 1 4 68
A34H LW5 OPH~4 4000264 O0 000 O0 0 6 1 1 4 68
PiOH LW5 OHNfl~4000264 O0 000 O0 0 6 1 1 4 68
P16H LW5 0~4000264 O0 000 O0 0 6 1 1 4 68
P22H LW5 0H~4~4000264 O0 000 O0 0 6 1 1 4 68
P28H LW$ OH~Tff4000264 O0 000 O0 0 6 1 1' 4 68
P31H LW5 0HN~I4000264 O0 000 O0 0 6 1 ! 4 68
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
LIS Ta~'/Verification Listing
Schlumberger Alaska Computing Center
PAGE:
24
** DATA **
DEPT. 14974. 500 TVDE. LW5
TABR. LW5 - O. 016 A1 OH. LW5
A28H. LW5 5. 960 A31H. LW5
P16H.LW5 4. 809 P22H. LW5
DEPT. 16884.500 TVDE.LW5
TABR . LW5 14606.563 Ai OH. LW5
A28H. LW5 6. 889 A31H. LW5
P16H. LW5 6. 672 P22H. LW5
8959.191 ROP5.LW5
5.410 A16H. LW5
5.936 A34H. LW5
5.177 P28H. LW5
8914.268 ROPS.LW5
5.192 A16H. LW5
7.103 A34H. LW5
7.831 P28H. LW5
11. 804 MTEM. LW5
5. 661 A22H. LW5
5.914 P1 OH. LW5
5. 331 P31H. LW5
12.640 MTE~I. LW5
5.866 A22H. LW5
7.324 PiOH. LW5
9.049 P31H. LW5
208. 028
5. 874
4.280
5.377
224.996
6.400
5.510
9.732
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .006
SERVICE · FLIC
VERSION · O01CO1
DATE · 99/01/25
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 99/01/25
ORIGIN : FLIC
TAPE NAME · 98623
CONTINUATION # : 1
PREVIOUS TAPE :
COGENT · BP EXPLORATION, R-2OA, PRUDHOE BAY, API #50-029-20641-01
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 99/01/25
ORIGIN : FLIC
REEL NAME : 98623
CONTINUATION # :
PREVIOUS REEL :
CORfffENT · BP EXPLORATION, R-2OA, PRUDHOE BAY, API #50-029-20641-01