Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
206-059
STATE OF ALASKA 1 ' s" i 3KA OIL AND GAS CONSERVATION CORAL JION • REPORT OF SUNDRY WELL OPERATIONS AUG 0 5 2.01 1 Operations Abandon LJ Repair Well LJ Plug Perforations H Perforate U Other L A G C C Performed Alter Casing ❑ Pull Tubing❑ Stimulate-Frac 0 Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat Shutdowns Stimulate-Other ❑ Re-enter Suspended Well❑ 2 Operator 4 Well Class Before Work: 5.Permit to Dnll Number Name BP Exploration(Alaska),Inc Development Exploratory ❑ 206-059-0 3 Address P 0 Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-23309-00-00 7 Property Designation(Lease Number) 8 Well Name and Number ADL0047447 PBU L-51 9 Logs(List logs and submit electronic and pnnted data per 20AAC25.071) 10 Field/Pool(s). PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary Total Depth measured 15683 feet Plugs measured None feet true vertical 8935 67 feet Junk measured None feet Effective Depth measured 15683 feet Packer measured See Attachment feet true vertical 8935 67 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 85 20"91 5#H-40 24-109 24-109 1490 470 Surface 2669 9-5/8"40#L-80 28-2697 28-2693 99 5750 3090 Intermediate None None None None None None Production 10323 7"26#L-80 26-10349 26-8721 74 7240 5410 Liner 5510 3-1/2"9 2#L-80 10173-15683 8646.37-8935 67 10160 10530 Perforation depth Measured depth 10392-13121 feet 13164-14222 feet 14265-15650 feet True Vertical depth 8735.72-8831 61 feet 8829.71-8873 22 feet 8874 56-8935 1 feet Tubing(size,grade,measured and true vertical depth) 3-1/2"9 2#L-80 24-10178 24-8648.73 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured). �NN6© 10392'-15651' } !' Treatment descnptions including volumes used and final pressure 879 BBLS YF127 FLEXD X-LINK GEL,311 BBLS WF127 FLEXD LINEAR GEL,265 BBLS 20/40 SB EXCEL,140 BBLS 20/40 CARBOBOND, 10 BBLS POWERVIS, 54 GALS L65 SCALE INHIBITOR,54 GALS F103 SURFACTANT, 116 GALS L64 CLAY STABILIZER, 114 GALS J604,250 GALS B882 GUAR POLYMER 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Pnor to well operation 2 1263 2 977 323 Subsequent to operation 746 1335 128 1357 318 14 Attachments 15.Well Class after work Copies of Logs and Surveys Run Explorators,❑ Development 0 Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil 0 Gas ❑ WDSPL❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCG 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt: N/A Contact Nita Summerhays Email Nita.Summerhaysabp.com Printed Name Nita Su ii- • --a / Title Petrotechnical Data Engineer Signa • errie 4,1A Phone 564-4035 Date 8/5/2014 rL 3ii11r,f RBCMS AUG - 6 2kt Form 10-404 Revised 10/2012 i` A0r Submit Onginal Only Daily Report of Well Operations ADL0047447 ACTIVITYDATE I SUMMARY V1 • • - • pre rac DRIFT PAST X-NIPPLE @ 10,154' MD W/2.80" CENT TO 10160' SLM W/NO ISSUES. 5/9/2014 ***CONTINUE ON 5/10/2014*** ***CONTINUE FROM 5/912014*** SET 3-1/2" PX-PLUG BODY AT 10,153' SLM (10,154' MD) RAN CHECK SET TO PX-PLUG BODY AT 10,153' SLM (10,154' MD) (sheared) SET P-PRONG IN PX-PLUG BODY AT 10,149' SLM PERFORM PASSING DRAW DOWN TEST SET 3-1/2" WHIDDON ON PRONG AT 10,144' SLM PULLED INT-OGLV FROM STA. #1 AT 10,032' SLM (10,009' MD) PULLED INT-LGLV FROM STA. #3 AT 7,790' SLM (7,774' MD) PULLED INT-LGLV FROM STA. #5 AT 5,752' SLM (5,744' MD) PULLED INT-LGLV FROM STA. #7 AT 3,630' SLM (3,631' MD) PULLED INT-LGLV FROM STA. #8 AT 2,174' SLM (2,183' MD) SET INT-DGLV IN STA. #8 AT 2,174' SLM (2,183' MD) 5/10/2014 ***CONTINUE ON 5/112014*** T/I/0=1295/1362/365 ( Circ-Out Tx IA) Rig to Tx IA. Pumped 58 bbls 60/40 McOH followed by 290 bbls 1% KCL down IA up TBG taking returns down F/L. Pumped 42 5/11/2014 BBLs 60/40 to attempt 2 failing CMIT TxIA see log***WSR continued to 5-12-14*** ***CONTINUE FROM 5)10/2014*** (fracturing) SET INT-DGLV IN STA. #7 AT 3,630' SLM (3,631' MD) SET INT-DGLV IN STA. #5 AT 5,752' SLM (5,744' MD) SET INT-DGLV IN STA. #3 AT 7,790' SLM (7,774' MD) SET INT-CIRC VALVE IN STA. # 1 @ 10,032' SLM (10,009 MD) PULLED EMPTY CATCHER FROM 10,144' SLM 5/11/2014 ***WELL LEFT S/I, PAD OP NOTIFIED ON DEPARTURE*** ***WSR continued from 5-11-14***(Obj. Circ out well boar fluids CMIT TxIA PASS to 4000 psi) Pumped 3.7 bbls 60/40 McOH down IA to achieve 4000 psi CMIT TxIA test pressure. TBG/IA lost 24/24 psi in 1st 15 min and 19/19 psi in 2nd 15 min for a total loss of 43/43 psi over the 30 min test. Circ-Out Tx IA with 350 bbls Inhibited 9.8 NaCL down IA taking returns up TBG and out FL. Pump 7 bbls diesel FP. U-Tube Tx IA. FP FL with 10 bbls 60/40 meth. RDMO. FWHP=435/395/424 wing=shut/swab=shut/ssv=shut/ 5/12/2014 master=open/ IA and OA open to gauges. Operator Notified of departure. ***WELL SHUT IN ON DEPARTURE*** SET 3-1/2'WHIDDON ON P-PRONG AT 10,144' SLM PULLED INT-CIRC VLV FROM STA. #1 AT 10,032' SLM (10,009' MD) SET INT-DGLV IN STA. #1 AT 10,032' SLM (10,009' MD) PULL 3-1/2"WHIDDON FROM 10,144' SLM PULL PRONG FROM PX-PLUG BODY @ 10,149, SLM 5/13/2014 ***CONTINUE ON 5/14/2014*** ***CONTINUE FROM 5/13/2014***(pre-frac) PULL PX-PLUG BODY FROM X NIPPLE @ 10,153' SLM (10,154' MD) 5/14/2014 ***WELL LEFT SHUT IN ON DEPARTURE, PAD OP NOTIFIED*** T/I/O= 550/300/250 Temp=S/I Injectivity Test(FRACTURING). Pumped 5 bbls meth, 5/14/2014 88 bbls 1% KCL. ****continue onto 05-15-14 WSR**** ****continue from 05-14-14 WSR**** Injectivity Test(FRACTURING). Pumped 474 bbls 5/15/2014 1% KCL, 22 bbls DSL for Freeze Protect. FWHP= 1100/0/673 Daily Report of Well Operations ADL0047447 T/I/O=(Tree Saver) NA/220/280 Temp=SI (Pre Frac) MIT-IA 3000 psi **PASSED** Pumped 2 bbls, ambient meth down IA to achieve MIT-IA to 3000 psi. 1st 15 min IA lost 22 psi. 2nd 15 min IA lost 8 psi for a total loss of 30 psi over 30 min test. Valve positions=WV, IA closed. SV, SSV, MV open. OA= OTG, FWHP=Tree saver/237/295. 6/19/2014 MIT-IA Tags= WV& IA valve. DSO notified of LRS departure. (FRAC-SUPPORT). Circulate frac-tank fluids. Temp= 100*on all Frac tanks. ***WSR 6/20/2014 continues 6/21/14*** ***WSR continued from 6/20/14****(FRAC SUPPORT).. RU to PRV Manifold skid, set PRV's © 3000 psi. Pump 6 bbls diesel to mantain 2750 psi during frac. 6/21/2014 FWHP=Frac/750/300 SLB Frac crew on well upon departure ***SLB Frac Crew***Job Scope: Fracture Treatment Targeting Sag Zone using two fiber diversions to inisiate additional fractures <<<InterAct Publishing>>> Rig up frac equipment, LRS and Stinger tree saver. Pump injection test/step up test, Scour Stage @ 20 bpm with hard shut down. Data analysis showed FG = 0.54, leak-off coef= 0.0025, Pc 890 psi. Pump Frac at 25 bpm using YF127FIexD (x-link) system . Pad stage of 200 bbls. 1 PPA Flat stage 20/40 SB Excel proppant in 50 bbls, 2 PPA Flat stage 20/40 SB Excel proppant in 50 bbls, 3 PPA Flat stage 20/40 SB Excel proppant in 50 bbls, 4 PPA Flat stage 20/40 SB Excel proppant in 55 bbls, 5 PPA Flat stage 20/40 SB Excel proppant in 60 bbls, 6 PPA Flat stage 20/40 CarboBond Lite in 65 bbls, 7 PPA Flat stage 20/40 CarboBond Lite in 76 bbls, 8 PPA Flat in 40 bbls. Pill of 12/20 mesh sand w/B361-1220 displacing with WF127 (Linear gel)At 85.2 bbls of displacement treating pressure rapidly increased giving indication well had screened off during 8 PPA stage. Diversion pill did not make it down to liner. Est net pressure build of 1200# 69,424 lbs 6/21/2014 of 20/40 sand behind pipe and 3,682 lbs in TBG & Liner. ***Job Complete*** CTU #6 - 1.75" Coil Objective: Post-frac FCO MIRU CTU and Begin BOP test 6/26/2014 ...Continued on WSR 6-27-14... CTU #6- 1.75" Coil ***Continued from WSR 6-26-14*** Objective: Post-Frac FCO Complete BOP test. Make up Reverse FCO BHA w/2" BDJSN and RIH. Tag hard at 8173', PUH and get weight back at 8169'. Able to cleanout past bridge, continue to take bites while reverse circulating down to 10272'. PUH to 10216' and pump two coil volumes. RIH cleaning and have sudden losses of 50% at 10375'. PUH and circulate coil clean and regained full returns. RBIH taking bites down to 10490'and then 10600' until stable losses of 60%. Once all solids circulated out of coil, swap to circulating down coiled tubing and launch 7/8" ball to begin jetting. Perform inj. test of 279 @ 0.5 bpm, 461 @ 0.8 bpm, and 600 @ 1 bpm. 6/27/2014 ...Continued on WSR 6-28-14... CTU #6- 1.75" Coil ***Continued from WSR 6-27-14*** Job Objective: Post-Frac FCO POOH jetting all GLM, chasing at 80%. Pump gel pill though coil to ensure solids free. FP well with 22 bbls 50/50 Meth. RDMO CTU. 6/28/2014 ***Job Complete*** Daily Report of Well Operations ADL0047447 ***WELL S/I UPON ARRIVAL*** SET 3-1/2" SLIP STOP @ 5,850' SLM PULL DGLV FROM ST#5 @ 5,752' SLM/5,744' MD. PULL DGLV FROM ST#7 @ 3,620' SLM/3,631' MD. SET INTG-LGLV IN ST#7 @ 3,620' SLM/3,631' MD. SET INTG-LGLV IN ST#5 @ 5,752' SLM/5,744' MD. PULL 3-1/2" SLIP STOP FROM 5,850' SLM. 6/29/2014 ***WELL S/I UPON DEPARTURE. PAD OP NOTIFIED*** ASRC Test Unit#2. Frac F/B Inlet L-51, Outlet L-116. MIRU. *** Continue on 7-1-14 6/30/2014 WSR *** ASRC I est Unit#2. Frac I-/B Inlet L-51, Outlet L-121. ***Continue from 6/30/14 WSR 7/1/2014 ***Cont RU, PT, SB for Ch2& Pad op. ***Continue on 7-2-14 WSR *** ASRC Test Unit#2. Frac F/B Inlet L-51, Outlet L-121. *** Continue from 7-1-14 WSR *** Cont SB for pad op/PCC, POP and flow well. 7/2/2014 ***Continue on 7-3-14 WSR *** ASRC Test Unit#2. Frac I-/B Inlet L-51, Outlet L-121. ***Continue from 7-2-14 WSR*** 7/3/2014 Flow Well, ***Continue on 7-4-14 WSR*** ASRC Test Unit#2. Frac F/B Inlet L-51, Outlet L-121. ***Continue from 7-3-14 WSR *** 7/4/2014 Flow Well,Well Test in progress ***Continue on 7-5-14 ASRC Test Unit#2. Frac F/B Inlet L-51, Outlet L-121. ***Continue from 7-4-14 WSR *** 7/5/2014 Flow Well, Well Test***Continue on 7-6-14 WSR *** ASRC Test Unit#2. Frac F/B Inlet L-51, Outlet L-121. *** Continue from 7-5-14 WSR*** 7/6/2014 Flow Well, Well Test#2, RDMO ***Job Complete *** FLUIDS PUMPED BBLS 41 DIESEL 852 1% KCL 115 60/40 METH 350 INHIBITED 9.8 NaCL 7 METH 879 YF127 FLEXD X-LINK GEL 311 WF127 FLEXD LINEAR GEL 265 20/40 SB EXCEL 140 20/40 CARBOBOND 53 50/50 METH 1004 1% SLICK KCL 10 POWERVIS 4027 TOTAL FLUIDS PUMPED GALS 54 L65 SCALE INHIBITOR 54 F103 SURFACTANT 116 L64 CLAY STABILIZER Daily Report of Well Operations ADL0047447 114 J604 250 B882 GUAR POLYMER 588 TOTAL , Packers and SSV's Attachment ADL0047447 SW Name Type MD TVD Depscription L-51 PACKER 10107 8536.79 3-1/2" Baker S-3 Packer L-51 PACKER 10173 8570.07 5-1/2" BAKER ZXP PACKER L-51 PACKER 13131 8754.83 2-7/8" Swell Packer L-51 PACKER 14232 8797.25 2-7/8" Swell Packer TIS a. 41/16"CIW SA NOTES:""W ELL ANGLE >70"@ 10374' WELLFEAD= 11"FMC L-5 1 ••, ACTUATOR= LEO OKB.ELEV= 76.3' BF l3EV= 47.9' IF i I KOP= 2600' ' Max Angle= 94"(4-1-1297'' 20"GOND 109 2131' H3-1/2"FES X MR D=2.813" Datum M)= 14315''' I Datum TVD= 8800'SS GAS UFT MANDRELS 9-5/8"CSG,40#,L-80 BTC,D=8.835" H 2697' ST MD TVD DEV TYPE VLV LATCH PORT DUE 8 2183 2180 0 KBG2 DMY NT 0 05/11/14 7 3631 3592 30 KBG2 DOME NT 16 06/29/14 T CSG,26#,L-80 TCS XO TO BTC-M —4 4027' X 6 4735 4474 39 KBG2 CNN INT 0 09/08/06 5 5744 5280 36 KBG2 SO INT 20 06/29/14 T FES ESC /lEh TBZ H 7116' I—O D 4 6747 6076 37 1(5G2 DW INT 0 06/30/06 3 7774 6888 37 KBG2 DM' SIT 0 05/11/14 3-112"SYMPHORE PLUS GUAGE CAtRt H10035' —6 2 8770 7677 38 KBG2 DMY SIT 0 06/30/06 w/I•NMRE N IA TO SURFACE ACE 10009 8557 52 KBG2 OMY INT _ 0 05113/14 I 10087' H 3-1/2"FBS X NP,D=2.813" Minimum ID =2.813" @ 2131' 3-1/2" HES X NIPPLE Z 1010T H7"X3-1/TBKR S-3 MOD PKR,D=2.870" I 10134' H3-1/2"I-ES X NP,D=2.813" ' 10154' H3-1/2"FES X NI?0=2.813" TOP OF 3-1/2"UR H 10173' 10173' 7"X 5-1/2'ZXP LNR TOP PKR w 1 11'TIEBACK SLV,D=4.420' EZ 3-1/2"TBG,9.2*,L-80 BT-M,.0087 bpf,11)=2.992" I-- 10175' �� 10178' —{4112"WLEG,D=3.958" --I t3 MD IT NOT LOGGED 1-7"XS"BKRFNACLNRFIGR D=4.400" \I 10197' H5"x4112"XO,D=3.958' \I 10199' —4-1/2"X 3-1/2" XO,D=2.97" 7"CSG,26#,L-80 BTC-M,D=6.276" H 10349' I"4 3-12"LNR,9.211,L-80 BT,.0087 bpf,D=2.992' H 10393' 7 FERFORATION SUMMARY REF LOG:SWS VISION ON 06/26/06 13131' —ITAM SWELL PKR,D=2.992" ANGLE AT TOP PERE WA I I Nate:Refer to A'oduction DB for historical perf data I SIZE SPF INTERVAL Opn/Sqz SEDT SOZ ivF1 Imo' 14232' ---ITAM SWELL PKR,D=2.992" 3-1/2" SLID 10392-15651 SLOT 07/01/06 '� I I I I ..vvvv 15681' —I PBTO 3-1/2"LW,9.2#,L-80 BT,.0087 bpf,D=2.992" —j 15683' I.•�.�. 11 10.0 DATE REV BY CONSENTS DATE REV BY COMMENTS PRUDHOE BAY LNf - 07/01/06 IMES ORIGINAL COMPLETION 05!11/14' CJPYPJC 'GLV CIO WELL: L-51 09/08/06 RCT/JPJC GLV CJO 05/13/14 CJN'PJC GLV CIO R32I.IT Na:"2060590 11/07/06 JLJ/TLH XX PLUG w/SHS(f SET 07/07/14 1143S/JM)GLV C+O(06/29/14) AR No: 50-029-23309-00 11/19/06 JCt1MPAG RESET XX PLUG @ 10091' SEC 34,T12N,R11 E,2343'FSL&1421'FWL 06/06/07 ?LH PULLED XX PLUG(02/15/07) 01/13/08 WWR/PJC DWG DRAFT 11MS ,_ BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q ~Q - ~ ~~ Well History File Identifier Organizing (done) ^ Two-sided III IIIIII II III II III ^ Rescan Needed III I~~I~I II II III III RESCAN DIGITAL DATA OVERSIZED (Scannable) ~olor Items: iskettes, No.' ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: BY: Maria Date: ~ - L `" ~ ~ ^ Other:: /s/ Project Proofing II I II II II V III I I III BY: Maria Date: $ - I "" ~ $ /s/ Scanning Preparation ~ x 30 = ~J~ + ~ =TOTAL PAGES -~ _ ~y /~ "` ~ Count does not include cover a ( ) BY: Maria Date: T~ '- ( t J lsl II V L Production, Scanning Stage ? Page Count from Scanned File: (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: ~ 1 - D g /s/ Stage 7 If NO in stage 1, page(s) discrepancies were found: YES NO 1 BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. III III~II I II II I I III ReScanned III II'lll VIII II III BY: Maria Date: /s/ Comments about this file: Quality Checked III II III) III IIII II 10/6/2005 Well History File Cover Page.doc ~' ,~+ ~... ro Y ~ yu - ~~ u. ..~ fF fi .... 1 .ui ~ --~i,;:r,. r ~~ ~~. +~le ~ MICROFILMED. 6/30/2010 DO NOT PLACE ANY N EW MATERIAL. UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc • BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 c~~:va~'~'ti~~ ~-~ `' ~~ ',l ~;_ ~~ ~ ~ ~ ~ August 14, 2009 . bp ~~~~~~~~ Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB L-Pad Dear Mr. Maunder, 0 C T 4~ 2009 ~las~Ca ~il ~ Gas Cons. Commi~~io~ Anchorag~ a~~ ~~s~ ~~ ~~ Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB L- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • . BP Exploration (Alaska ) Inc. Surface Casing by Conductor Mnulus Cement, Corrosion inhibitor, Sealant Top-off HepoR ot Sundry Operationa (10-404) nsrn L pad R/1'~M~09 Well Name PTD # API # Inftial to of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Conosion inhibitor! sealant date it bbls ft na al L-01 2010720 50029230110000 NA 6 NA 61.2 6/25/2009 L-02A 2041490 50029230480100 NA 1.4 NA 14.5 6/27/2009 L-03 2051030 50029232690000 NA 2.8 NA 24.7 6/25/2009 L-04 2061200 50029233190000 NA 1.7 NA 15.3 6/25/2009 L-100 1980550 50029228580100 NA 62 NA 57.8 6/29/2009 L-101 1980320 50029228650000 NA 3.3 NA 30.6 6/29/2009 L-102 2020360 50029230710000 37' NA Need To Job? NA L-103 2021390 50029231010000 NA 1.6 NA 102 6/26/2009 L-104 2012380 50029230600000 NA 3.5 NA 47.6 5/6/2009 L-105 2020580 50029230750000 NA 1.75 NA 24.65 5/6/2009 L-106 2012230 50029230550000 NA 2.75 NA 28.05 5/6/2009 L-107 2011510 50029230360000 NA 4.8 NA 57.8 5/6/2009 L-108 2021090 50029230900000 NA 1.2 NA 13.8 6/25/2009 L-109 2012010 50029230460000 NA 2.9 NA 32.3 6/27/2009 ~-110 2011230 50029230280000 NA 27 NA 316.2 6/29/2009 L-111 2020300 50029230690000 NA 4.7 NA 54.4 6/29/2009 L-112 2022290 50029231290000 NA 5.5 NA 51 6/27/2009 L-114A 2051120 50029230320100 NA 2.5 NA 25.5 6/29/2009 L-115 2011400 50029230350000 NA 0.5 NA 3.4 6/27/2009 L-it6 2011160 50029230250000 NA 5 NA 54.4 6/28/2009 L-117 2011670 50029230390700 NA 2.9 NA 28.9 6/27/2009 L-118 2011870 50029230430000 NA 1.4 NA 15.3 6/27/2009 L-119 2020640 50029230770000 NA 225 NA 28.9 5/6/2009 L-120 2020060 50029230640000 NA 0.75 NA 6.8 5/5/2009 L-121A 2030390 50029231380100 NA 2.2 NA 25.5 6/27/2009 L-122 2030510 50029231470000 NA 2 NA 20.4 6/27/2009 1-123 2051940 50029232900000 NA 2 NA 18.7 6127J2009 L-124 2050430 50029232550000 NA 1.8 NA 17 6/27/2009 L-200 2040010 50029231910000 NA 1.8 NA 13.5 6/26/2009 L-201 2040460 50029232020000 NA 1.75 NA 15.3 5!6/2009 L-202 2041960 50029232290000 NA 2 NA 17 6@6/2009 L-204 2060920 50029233140000 NA 1.5 NA 5.95 5/6/2009 L-205 2080530 50029233880000 NA t NA 12.75 1/10/2009 L-210 2031990 50029231870000 NA 3.25 NA 31.4 5/5/2009 L-211 2040290 50029231970000 NA 1.8 NA 17 6/27/2009 L-212 2050300 50029232520000 NA 1.8 NA 17 6/26/2009 L-213 2060530 50029233080000 NA 2 NA 17 6/25/2009 L-214A 2060270 50029232580100 NA 025 NA 10.2 5/6/2009 L-215 2051270 50029232740000 NA 1.5 NA 30.6 5/6/2009 L-216 2040650 50029232060000 NA 1.3 NA 11.9 6/26/2009 L-217 2060750 50029233120000 late blockin conductor NA NA L-218 2051190 50029232720000 NA 1.7 NA 15.3 6/27/2009 L•219 2071480 50029233760000 surface NA NA L-220 2080470 50029233870000 NA 2 NA 20.4 6/28/2009 L-221 2080310 50029233850000 NA 1.7 NA 16.2 6/25/2009 L-250 2051520 50029232810000 NA 3.4 NA 34 6/26/2009 L-50 2051360 50029232770000 NA 1.8 NA 20.4 6/27/2009 L•51 2060590 50029233090000 NA 1.8 NA 17 6/27/2009 I I DATA SUBMITTAL COM LIANCE REPORT ~~~i2oos Permit to Drill 2060590 Well Name/No. PRUDHOE BAY UNIT L-51 Operator BP EXPLORATION (ALASKA) INC MD 15683 TVD 8936 Completion Date 7/1/2006 Completion Status 1-OIL Current Status 1-OIL API No. 50-029-23309-00-00 UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: MWD ! GR, MWD / GR /RES / PWD, MWD / GR /RES /DEN / NEU / Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Type Med/Frmt Number Name Scale Media No (data taken from Logs Portion of Master Well Data Maint Interval OH / Start Stop CH Received Comments D D Asc Directional Survey 0 15683 Open pt Directional Survey 0 15683 Open 9/15/2006 og Cement Evaluation 5 Col 1 200 10100 Case 7/25/2006 USIT, CBL 28-Jun-2006 C Lis 15659 Induction/Resistivity 52 15682 Open 11/9/2007 LIS Veri, GR, ROP, FET, RPM, DRHO, NPHI w/ Graphic PDS og Induction/Resistivity 2 Blu 108 15683 Open 11/9/2007 MD Vision Service 26-Jun- 2006 ~og Induction/Resistivity 2 Blu 108 15683 Open 11/9/2007 TVD Vision Service 26-Jun- L_ - --- -- 2006 Well Cores/Samples Information: Name ADDITIONAL INFORMATION Well Cored? Y /® Chips Received? '~4TI~' Analysis ~/-Id~ Received? Sample Interval Set Start Stop Sent Received Number Comments Daily History Received? ~/ N Formation Tops ~ N L~ Comments: DATA SUBMITTAL COMPLIANCE REPORT ~i~i2oos Permit to Drill 2060590 Well NamelNo. PRUDHOE BAY UNIT L-51 MD 15683 TVD 8936 Completion Date 7/1/2006 Compliance Reviewed By: __.__._.__- Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23309-00-00 Completion Status 1-OIL Current Status 1-OIL UIC N Date: _ 11 /05/07 ~~hlumb~rer N0.4360 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 40o Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay, Niakuk, Milne Pt., Pt. Mac, Prince C Well •Inh # Inn f)ascrin4inn fla4o RI Cnlnr RIl S-400A 11855508 USIT (REVISED) C 09118/07 1 C-30 11695080 LDL 10/16/07 1 Z-228 11594525 SBHP SURVEY 10/06/07 1 14-31 11890316 LDL 10/18107 1 NK-22A 11855822 DRIFT TDILDL (- 10125107 1 • MPG-07 N/A CORRELATION/DDL ~ 09/08/07. 1 • MPG-07 11628799 MEM INJ PROFILE C, - - 10120/07 1 MPF-10 11767140 MEM INJ PROFILE _ - 09115/07 1 MPS-05 11745237 MEM PPROF SUPPLEMENT LOG -' 3"~-. 10/09/07 1 P2-19A 11649963 _ MCNL ~ ~ ~~ _ 04/22/07 1 1 OWDW-SW 11221548 RST ~ 03/05/06 1 1 W-17A 11588701 MCNL _ t •~ 12/26/06 1 1 14-30A 11485775 MCNL .-6 (00 11/22/06 1 1 L-51 40013624 OH MWD/LWD EDIT 06/26/06 2 1 YLtASt AI:KNUWLtUGt KtGEIP I t3Y SIGNING ANU KETUKNING ONE DOPY EACH TO: BP Exploration (Alaska) Inc. ~ ~.~ ~ ~~ ~' I';~ Petrotechnical Data Center LR2-1 T ~ ~~~ ~~'~'^~'^"~ 900 E. Benson Blvd. Anchorage, Alaska 99508 ~~~~~t J ~~ ~~~~ Date Delivered: " il~sl~`~.`.7SC,ItI Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~ Received by: c: 'Y ~G~G'v~...v ~G l~/~i/off ,! (; ~~ 0 4 Z00 STATE OF ALASKA LA I ND GAS CONSERVATION COM~SION Alaska Dil & ~ ~~~~ ~~LE IT ON OR RECOMPLETION REPORT AND LOG AnC~Ofage 10/03/06: Revised, Put on Production 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zoAACZS.~os zoAACZS.~~o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1 b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 7/1/2006 12. Permit to Drill Number 206-059 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 6/2/2006 13. API Number 50-029-23309-00-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 6/26/2006 14. Well Name and Number: PBU L-51 2343 FSL, 3859 FEL, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 1217' FSL, 156' FEL, SEC. 28, T12N, R11 E, UM 8. KB Elevation (ft): 76.3' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 1234' FSL, 242' FEL, SEC. 21, T12N, R11E, UM 9. Plug Back Depth (MD+TVD) 15683 + 8936 Ft Pool 4b. Location of Well (State Base Plane Coordinates): Surface: x- 583058 y- 5978063 Zone- ASP4 10. Total Depth (MD+TVD) 15683 + 8936 Ft 16. Property Designation: ADL 047447 TPI: x- 581427 y- 5982198 Zone- ASP4 Total Depth: x- 581273 y- 5987494 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD / GR, MWD / GR /RES ! PWD, MWD / GR /RES /DEN / NEU /PERISCOPE, USIT 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT SIZE WT. PER FT. GRADE TOP BOTTOM ' TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 109' Surface 109' 42" 260 sx Arctic Set A rox. 9-5/8" 40# L-80 28' 2697' 28' 2694' 12-1 /4" 485 sx AS Lite 213 sx Class 'G' 7" 2 L-80 26' 1 349' 26' 8722' 8-3/4" 420 sx LiteCrete 241 sx I s 'G' 3-1/2" 9.2# L-80 10173' 15683' 8646' 8936' 6-1/8" Uncemented Slotted Liner 23. Perforations open to Production (MD + TVD of Top and 24. TUBING. RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MO PACKER SET MD 3-1/2" Slotted Section 3-1/2", 9.2#, L-80 10178' 10107' MD TVD MD TVD 10393' - 13121' 8736' - 8832' 13165' - 14222' 8830' - 8873' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 14265' - 15651' 8875' - 8935' DEPTH INTERVAL MD AMOUNT 8c KIND OF MATERIAL USED Downsqueeze 9-5/8" x 7" Annulus with 30 Bbls (145 sx Class'G' Freeze Protect w/ 88 Bbls Diesel 26. PRODUCTION TEST Date First Production: September 8, 2006 Method of Operation (Flowing, Gas Lift, etc.): Gas Lift Date of Test 9/16/2006 Hours Tested 6 PRODUCTION FOR TEST PERIOD OIL-BBL g2 GAS-MCF 320 WATER-BBL 8 CHOKE SIZE 96 GAS-OIL RATIO 3,472 FIOW TUbing Press. 300 CeSing PreSSUre 1,500 CALCULATED 24-HOURRATE• OIL-BBL 368 GAS-MCF 1,278 WATER-BBL 30 OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". S ~~'~- a c~ ~ ~ 2oofi None r l; - __ __ Form 10-407 Revised 12/2003~~ ~~ ~ ~ ~ ~ ~ g/~ pI,ONTINUED ON REVERSE SIDE ..t° . i ~ _ ~ l . L.... 28. GEOLOGIC MARKS 29. ORMATION TESTS Include and brie ummarize test results. List intervals tested, NaMe MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Ugnu 278T 2734' None Ugnu M 4042' 3934' Schrader Bluff N 4365' 4188' Schrader Bluff O 4572' 4348' Base Schrader Bluff /Top Colville 4973' 4663' H RZ 6773' 6097' Kalubik 7049' 6314' Kuparuk D 7236' 6461' Kuparuk C 7252' 6474' Kuparuk B 7465' 6641' Kuparuk A 7662' 6797 Miluveach 7772' 6886' Kingak 8724' 7641' Sag River 10336' 8717' 30. List of Attachments: 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. l b ~ Signed Terrie Hubble Title Technical Assistant Date l ~~~p PBU L-51 206-059 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number Permit No. / A fOV81 NO. Drilling Engineer: Scott KOlstad, 564-5347 INSTRUCTIONS GeNer~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only L-51_Final_Survey.TXT SCHLUMBERGER (? v ~' ^-L2 Survey report client.... ............. BP Exploration (Alaska) Inc. Field ..................... Prudhoe Bay well.. .................. L-51 API number ................ 50-029-23309-00 Engineer .................. F.Medina/I.Hernandez Rig :...................... Nabors 9E5 STATE :.................... Alaska -- Survey calculation m Method for positions.....: Method for DLS....... ... ----- Depth reference ---- Permanent datum........... Depth reference........... GL above permanent.......: ic6 above permanent.......: DF above permanent.......: ethods------------- Minimum curvature Mason & Taylor - ----------- Mean sea Level Driller's Pipe Tally 47.80 ft NA Top Drive 76.30 ft ----- vertical section origin---------------- Latitude (+N/S-) ........ 0.00 ft Departure (+E/w-)......... 0.00 ft Platform reference point--------------- Latitude (+N/S-). ........ -999.25 ft Departure (+E/w-)......... -999.25 ft Azimuth from vsect Origin to target: 349.75 degrees [(c)2006 IDEAL ID10_2C_O1]o 26-gun-2006 15:06:15 Page 1 of 11 Spud date... ............ 2-Tun-06 Last survey date.......... 26-Tun-06 Total accepted surveys...: 279 MD of first survey........ 0.00 ft MD of last survey......... 15683.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2005 Magnetic date........ ... Ol-7un-2006 Magnetic field strength..: 57579.54 GAMA Magnetic dec (+E/w-).....: 24.21 degrees Magnetic dip .............. 80.86 degrees ----- MWD survey Reference Criteria --------- Reference G ............... 1002.68 meal Reference H ............... 57579.50 GAMA Reference Dip ............. 80.86 degrees Tolerance of G............ (+/-) 2.50 meal Tolerance of H............ (+/-)300.00 GAMA Tolerance of Dip.........: (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/w-).....: 24.21 degrees Grid convergence (+E/w-).: 0.00 degrees Total az corr (+E/w-)....: 24.21 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type ...: I=Sagg Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction SCHLUMBERGER Survey Report 26-dun-2006 15:06:15 Page 2 of 11 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy TOO1 # depth angle angle length depth section +N/S- +E/w- displ Azim (de / tool Corr g - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100 ) type (deg) Page 1 C J L-51_Final_Survey.TxT 0.00 0.00 290.00 0.00 0.00 0.00 0.00 0.00 - 0.00 --------- 0.00 ----- 0.00 ----- ------ TIP None 2 77.00 0.23 50.44 77.00 77.00 0.08 0.10 0.12 0.15 50.44 0.30 BP GYD CT DMS 3 170.00 0.25 77.71 93.00 170.00 0.17 0.26 0.46 0.53 60.55 0.12 _ BP GYD CT DMS 4 261.00 0.15 220.20 91.00 261.00 0.11 0.21 0.58 0.62 69.89 0.42 _ BP GYD CT DMS 5 359.00 0.23 82.19 98.00 359.00 0.02 0.14 0.69 0.70 78.50 0.36 _ BP_GYD CT DMS 6 451.00 .0.57 302.40 92.00 451.00 0.32 0.41 0.49 0.64 49.85 0.83 GYD CT DMS BP 7 543.00 1.94 299.46 92.00 542.97 1.62 1.42 -1.26 1.90 318.56 1.49 _ BP GYD CT DMS 8 635.00 3.46 299.31 92.00 634.87 4.39 3.55 -5.03 6.16 305.18 1.65 _ BP GYD CT DMS 9 727.00 4.26 302.95 92.00 726.66 8.49 6.76 -10.32 12.34 303.24 0.91 _ BP GYD CT DMS 10 819.00 4.17 301.29 92.00 818.41 13.05 10.36 -16.05 19.10 302.85 0.16 _ BP_GYD CT DMS 11 911.00 4.63 294.91 92.00 910.14 17.41 13.66 -22.27 26.13 301.52 0.73 BP GYD CT DMS 12 1004.00 5.04 292.48 93.00 1002.81 21.78 16.80 -29.45 33.91 299.71 0.49 _ BP GYD CT DMS 13 1097.00 5.50 287.29 93.00 1095.42 26.05 19.69 -37.48 42.34 297.72 0.71 _ BP GYD CT DMS 14 1191.00 5.33 288.96 94.00 1189.00 30.26 22.45 -45.91 51.11 296.06 0.25 _ BP GYD CT DMS 15 1284.00 4.65 284.94 93.00 1281.64 33.97 24.82 -53.64 59.11 294.83 0.82 _ BP_GYD CT DMS 16 1378.00 3.32 273.56 94.00 1375.41 36.24 25.98 -60.04 65.42 293.40 1.64 BP GYD CT DMS 17 1414.07 2.62 256.75 36.07 1411.44 36.45 25.85 -61.88 67.07 292.67 3.08 _ BP MWD+IFR+MS 18 1508.01 0.88 223.62 93.94 1505.33 35.91 24.84 -64.47 69.09 291.07 2 07 _ BP MWD+IFR+MS 19 1600.87 0.60 206.29 92.86 1598.18 35.10 23.88 -65.18 69.42 290.13 . 0.38 _ BPJ~IWD+IFR+MS 20 1693.90 0.74 206.04 93.03 1691.21 34.23 22.91 -65.66 69.54 289.23 0.15 BP_MWD+IFR+MS 21 1787.38 0.90 211.12 93.48 1784.68 33.19 21.74 -66.30 69.77 288.15 0.19 BPJ~IWD+IFR+MS 22 1881.21 1.00 205.58 93.83 1878.49 31.97 20.37 -67.04 70.06 286.90 0.14 BP MWD+IFR+MS 23 1975.48 1.07 204.46 94.27 1972.75 30.58 18.82 -67.76 70.32 285.53 0.08 _ BPJNWD+IFR+MS 24 2069.17 0.75 207.12 93.69 2066.43 29.37 17.48 -68.40 70.60 284.34 0.34 BP MWD+IFR+MS 25 2161.47 0.35 32.82 92.30 2158.73 29.10 17.18 -68.52 70.64 284.08 1.19 _ BPJNWD+IFR+MS 26 2256.14 0.69 12.25 94.67 2253.39 29.84 17.98 -68.24 70.57 284.76 0.40 BP MWD+IFR+MS 27 2349.96 0.59 14.38 .93.82 2347.21 30.80 19.00 -68.00 70.61 285.61 0.11 _ BP MWD+IFR+MS 28 2443.28 0.55 18.65 93.32 2440.52 31.63 19.89 -67.74 70.60 286.36 0.06 _ BP MWD+IFR+MS 29 2535.42 0.54 6.75 92.14 2532.66 32.43 20.74 -67.55 70.66 287.07 0.12 _ BP MWD+IFR+MS 30 2628.58 3.57 339.85 93.16 2625.75 35.71 23.90 -68.50 72.55 289.24 3.33 _ BP_MWD+.IFR+MS [(c)2006 IDEAL ID10_2C_O1]o SCHLUMBERGER Su rvey Report 26-Jun-2006 15:06:15 Page 3 of 11 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/w- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2647.82 3.95 339.58 19.24 2644.95 36.95 25.08 -68.93 73.36 290.00 1.98 BPJNWD+IFR+MS 32 2754.30 5.43 326.00 106.48 2751.07 45.17 32.70 -73.03 . 80.02 294.12 1.73 BP MWD+IFR+MS 33 2849.67 7.27 315.68 95.37 2845.85 54.30 40.76 -79.77 89.58 297.06 2.26 _ BP MWD+IFR+MS 34 2945.81 8.13 323.10 96.14 2941.13 65.42 50.55 -88.10 101.57 299.84 1.37 _ BP MWD+IFR+MS 35 3041.89 9.52 328.54 96.08 3036.07 78.90 62.76 -96.33 114.97 303.08 1.69 _ BPJNWD+IFR+MS • C~ Page 2 36 3136.76 37 3232.05 38 3327.86 39 3423.80 40 3519.82 41 3614.96 42 3711.35 43 3805.93 44 3907.89 45 4004.07 46 4099.66 47 4195.34 48 4290.73 49 4386.58 50 4482.49 51 4577.50 52 4673.86 53 4769.66 54 4864.91 55 4960.33 56 5056.08 57 5151.62 58 5246.90 59 5343.58 60 5438.72 11.28 13.81 16.94 20.20 25.28 29.29 30.77 33.10 36.34 37.04 37.07 37.45 39.30 39.86 39.24 39.03 39.57 38.52 36.88 37.13 37.17 37.38 37.73 37.32 36.19 329.86 327.43 330.37 335.66 334.47 331.35 327.31 325.21 326.67 328.00 328.41 328.05 327.20 327.19 325.60 325.24 325.54 323.56 322.81 322.70 322.75 325.68 326.59 329.94 334.68 [(c)2006 IDEAL ID10_2C_O1]o 94.87 95.29 95.81 95.94 96.02 95.14 96.39 94.58 101.96 96.18 95.59 95.68 95.39 95.85 95.91 95.01 96.36 95.80 95.25 95.42 95.75 95.54 95.28 96.68 95.14 3129.38 3222.39 3314.76 3405.70 3494.22 3578.76 3662.22 3742.48 3826.28 3903.41 3979.69 4055.84 4130.62 4204.50 4278.45 4352.15 4426.72 4501.12 4576.48 4652.68 4729.00 4805.03 4880.57 4957.25 5033.49 L-51_Final_Survey. 94.94 77.48 114.23 95.12 137.98 116.90 167.24 144.15 203.12 177.78 244.82 216.55 289.99 258.00 335.85 299.57 388.98 347.69 442.10 396.07 495.68 445.03 549.57 494.27 604.42 544.28 660.82 595.61 716.88 646.47 771.52 695.85 827.12 746.08 881.73 795.24 933.83 841.87 985.00 887.59 1036.51 933.60 1088.71 980.53 1141.92 1028.76 1196.70 1078.82 1250.96 1129.18 TXT -105.08 -115.89 -128.95 -142.69 -158.37 -178.29 -202.92 -230.72 -263.21 -294.22 -324.57 -355.07 -386.79 -419.87 -453.67 -487.70 -522.37 -557.35 -592.25 -627.01 -662.03 -695.85 -728.21 -759.18 -785.65 130.56 149.93 174.05 202.83 238.08 280.50 328.23 378.12 436.09 493.40 550.81 608.59 667.72 728.73 789.77 849.74 910.77 971.11 1029.33 1086.72 1144.51 1202.36 1260.41 1319.17 1375.61 306.40 309.38 312.19 315.29 318.30 320.53 321.81 322.40 322.87 323.39 323.90 324.31 324.60 324.82 324.94 324.97 325.00 324.97 324.87 324.76 324.66 324.64 324.71 324.87 325.17 1.87 2.71 3.37 3.82 5.31 4.47 2.60 2.73 3.28 1.10 0.26 0.46 2.02 0.58 1.24 0.33 0.59 1.70 1.79 0.27 0.05 1.87 0.69 2.15 3.21 BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BPJ~IWD+IFR+MS BP_MWD+IFR+MS BPJNWD+IFR+MS BPJNWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BPJNWD+IFR+MS BPJNWD+IFR+MS BP_MWD+IFR+MS BPJ~IWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BPJNWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS SCHLUMBERGER Survey Report 26-7un-2006 15:06:15 Page 4 of 11 Seq # Measured de th Intl an le Azimuth an l Course l th TVD d h vertical i Displ Displ Total At DLS Srvy Tool p g g e eng ept sect on +N/5- +E/w- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 5534.05 36.46 334.58 95.33 5110.30 1305.48 1180.21 -809.85 1431.34 325.54 0.29 BPJNWD+IFR+MS 62 5629.75 36.00 337.32 95.70 5187.50 1360.39 1231.84 -832.90 1487.00 325.94 1.76 BP MWD+IFR+MS 63 5726.13 35.40 337.08 96.38 5265.77 1415.29 1283.69 -854.69 1542.19 326.34 0.64 _ BP MWD+IFR+MS 64 5821.61 36.88 335.81 95.48 5342.87 1470.08 1335.30 -877.20 1597.66 326.70 1.74 _ BP MWD+IFR+MS 65 5916.99 37.99 336.01 95.38 5418.61 1526.38 1388.23 -900.87 1654.91 327.02 1.17 _ BP_MWD+IFR+MS 66 6012.86 38.22 336.21 95.87 5494.04 1583.87 1442.32 -924.83 1713.36 327.33 0.27 BPJNWD+IFR+MS 67 6108.66 36.86 337.31 95.80 5570.01 1640.75 1495.95 -947.86 1770.97 327.64 1.58 BP MWD+IFR+MS 68 6201.50 36.28 337.87 92.84 5644.57 1694.82 1547.09 -968.95 1825.47 327.94 0.72 _ BP J~iWD+IFR+MS 69 6295.10 36.15 338.94 93.60 5720.09 1749.04 1598.51 -989.31 1879.88 328.25 0.69 . BP MWD+IFR+MS 70 6388.59 36.64 339.54 93.49 5795.34 1803.58 1650.38 -1008.97 1934.36 328.56 0.65 _ BP_MWD+IFR+MS 71 6482.79 39.35 338.79 94.20 5869.57 1860.57 1704.56 -1029.60 1991.38 328.87 2.92 BP_MWD+IFR+MS Page 3 I ~ L J • 72 6575.68 39.14 339.00 73 6668.12 38.20 338.52 74 6761.72 37.25 338.90 75 6856.04 37.84 337.42 76 6949.25 38.95 338.53 77 7042.53 37.56 338.11 78 7134.29 38.04 338.46 79 7227.59 38.33 340.43 80 7321.34 38.23 340.57 81 7415.40 38.80 340.72 82 7507.4.5 38.18 338.66 83 7600.96 36.66 335.46 84 7694.05 36.14 336.19 85 7787.78 36.72 335.39 86 7880.73 37.53 335.58 87 7974.44 36.90 335.12 88 8068.71 37.52 334.45 89 8160.53 38.26 335.55 90 8250.12 38.03 336.25 [(c)2006 IDEAL ID10_2~01]0 SCHLUMBERGER Survey Report seq Measured Incl Azimuth # depth angle angle - __(ft) (deg) (deg) 91 8342.51 38.02 336.11 92 8437.08 37.57 335.59 93 8530.64 37.42 335.60 94 8623.34 37.24 338.32 95 8717.75 37.10 344.99 96 8810.85 39.22 350.65 97 8904.45 40.16 354.58 9$ 8998.49 42.11 356.78 99 9093.15 45.03 357.53 100 9187.40 45.50 358.81 101 9280.96 45.34 359.06 102 9374.13 44.37 0.05 103 9467.11 44.95 0.39 104 9560.64 46.65 1.78 105 9653.55 46.25 2.26 106 9748.43 45.75 1.83 107 9841.95 45.39 0.46 92.89 92.44 93.60 94.32 93.21 93.28 91.76 93.30 93.75 94.06 92.05 93.51 93.09 93.73 92.95 93.71 94.27 91.82 89.59 course length (ft) 92.39 94.57 93.56 92.70 94.41 93.10 93.60 94.04 94.66 94.25 93.56 93.17 92.98 93.53 92.91 94.88 93.52 5941.51 6013.68 6087.71 6162.50 6235.55 6308.80 6381.31 6454.64 6528.24 6601.83 6673.88 6748.16 6823.08 6898.50 6972.61 7047.23 7122.31 7194.78 7265.24 TVD depth (ft) 7338 02 7412.75 7486.98 7560.69 7635.95 7709.18 7781.21 7852.04 7920.62 7986.96 8052.63 8118.67 8184.81 8250.01 8314.03 8379.94 8445.41 L-51_Final_Survey.TXT 1918.28 1759.39 -1050.76 2049.28 329.15 1974.98 1813.22 -1071.68 2106.25 329.42 2031.19 1866.58 -1092.48 2162.79 329.66 2087.49 1919.93 -1113.87 2219.65 329.88 2144.17 1973.60 -1135.57 2276.97 330.08 2200.77 2027.26 -1156.90 2334.14 330.29 2255.89 2079.51 -1177.71 2389.85 330.48 2312.64 2133.52 -1197.95 2446.83 330.69 2369.96 2188.26 -1217.34 2504.08 330.91 2427.79 2243.53 -1236.75 2561.83 331.13 2484.20 2297.25 -1256.63 2618.49 331.32 2539.62 2349.57 -1278.74 2675.01 331.44 2593.23 2399.97 -1301.37 2730.09 331.53 2647.25 2450.73 -1324.20 2785.60 331.62 2701.62 2501.77 -1347.47 2841.57 331.69 2756.52 2553.28 -1371.11 2898.14 331.76 2811.59 2604.86 -1395.40 2955.07 331.82 2866.12 2655.97 -1419.22 3011.37 331.88 2919.85 2706.48 -1441.82 3066.57 331.95 26-]un-2006 15:06:15 Page vertical Displ Displ Total At section +N/s- +E/w- displ Azim (ft) (ft) <ft) (ft) (deg) ________ ________________ _______________ 2975.17 2758.54 -1464.80 3123.33 332.03 3031.43 2811.43 -1488.51 3181.16 332.10 3086.65 2863.29 -1512.04 3238.01 332.16 3141.46 2915.00 -1534.04 3294.01 332.24 3197.86 2969.07 -1551.98 3350.23 332.40 3255.29 3025.26 -1564.04 3405.65 332.66 3314.97 3084.52 -1571.70 3461.86 333.00 3376.48 3146.20 -1576.33 3519.00 333.39 3441.17 3211.35 -1579.56 3578.80 333.81 3507.40 3278.27 -1581.69 3639.89 334.24 3573.19 3344.90 -1582.93 3700.54 334.67 3637.94 3410.61 -1583.45 3760.26 335.10 3702.21 3475.96 -1583.20 3819.53 335.51 3767.94 3542.99 -1581.92 3880.11 335.94 3833.74 361b.29 -1579.54 3940.70 336.37 3900.43 3678.50 -1577.11 4002.33 336.79 3965.89 3745.26 -1575.77 4063.26 337.1$ Page 4 0.27 BPJNWD+IFR+MS 1.07 BP_MWD+IFR+MS 1.04 BPJNWD+IFR+MS 1.14 BP_MWD+IFR+MS 1.40 BP_MWD+IFR+MS 1.52 BP_MWD+IFR+MS 0.57 BP_MWD+IFR+MS 1.34 BPJMWD+IFR+MS 0.14 BP_MWD+IFR+MS 0.61 BPJNWD+IFR+MS 1.55 BP_MWD+IFR+MS 2.64 BPJNWD+IFR+MS 0.73 BP_MWD+IFR+MS • 0.80 BPJNWD+IFR+MS 0.88 BPJNWD+IFR+MS 0.73 BPJNWD+IFR+MS 0.79 BP_MWD+IFR+MS 1.09 BPJ~1wD+IFR+MS 0.55 BP_MWD+IFR+MS 5of11 DLggS Srvy TOO1 100fj tool C(de ) Yp 9 0.09 BP_MWD+IFR+MS 0.58 BP_MWD+IFR+MS 0.16 BP_MWD+IFR+MS 1.79 BP_MWD+IFR+MS 4.27 BPJNWD+IFR+MS 4.39 BP_MWD+IFR+MS 2.86 BPJNWD+IFR+MS 2.58 BP_MWD+IFR+MS 3.13 BPJNWD+IFR+MS 1.09 BP_MWD+IFR+MS 0.26 BP_MWD+IFR+MS 1.28 BP_MWD+IFR+MS 0.67 BP_MWD+IFR+MS 2.11 BP_MWD+IFR+MS 0.57 BP_MWD+IFR+MS 0.62 BP_MWD+IFR+MS 1.11 BP_MWD+IFR+MS 108 9886.85 46.50 359.52 109 9936.28 48.02 359.85 110 10028.15 53.22 1.59 111 10121.87 58.67 358.54 112 10215.23 64.04 356.81 113 10241.17 64.99 356.58 114 10291.44 65.15 356.05 115 10342.15 65.91 354.97 116 10373.61 71.27 353.84 117 10407.47 79.40 353.83 118 10438.40 86.66 353.90 119 10469.92 89.40 355.71 120 10501.38 89.40 355.71 [(c)2006 IDEAL ID10_2C_O1]a SCHLUMBERGER Survey Report Seq Measured Incl Azimuth # depth angle angle - __(ft) (deg) (deg) 121 10534.22 89.40 356 35 122 10570.26 89.49 354.25 123 10616.31 89.70 352.35 124 10665.25 88.74 351.02 125 10711.11 85.96 353.77 126 10761.33 84.41 353.53 127 10806.83 85.17 351.74 128 10856.90 85.13 351.74 129 10903.46 85.03 351.54 130 10952.57 85.13 352.34 131 11000.36 85.03 353.28 132 11048.36 85.00 352.24 133 11094.80 85.61 352.06 134 11144.06 86.75 351.28 135 11171.08 87.64 348.78 136 11202.46 88.77 349.45 137 11237.06 90.79 346.12 138 11264.30 92.98 348.04 139 11296.83 93.71 347.61 140 11327.15 93.44 346.77 141 11357.43 92.99 349.32 142 11388.47 91.62 349.19 143 11420.17 89.97 350.44 44.90 49.43 91.87 93.72 93.36 25.94 50.27 50.71 31.46 33.86 30.93 31.52 31.46 Course length (ft) 32.84 36.04 46.05 48.94 45.86 50.22 45.50 50.07 46.56 49.11 47.79 48.00 46.44 49.26 27.02 31.38 34.60 27.24 32.53 30.32 30.28 31.04 31.70 8476.63 8510.17 8568.44 8620.91 8665.66 8676.82 8698.01 8719.01 8730.49 8739.06 8742.81 8743.89 8744.22 ---ND - depth (ft) 8744.56 8744.91 8745.24 8745.90 8748.02 8752.24 8756.37 8760.60 8764.60 8768.81 8772.91 8777.08 8780.88 8784.16 8785.48 8786.47 8786.60 8785.70 8783.81 8781.92 8780.22 8778.97 8778.53 L-51_Final_SUrvey.TxT 3997.64 3777.53 -1575.78 4093.02 4033.40 3813.83 -1575.98 4126.62 4103.08 3884.81 -1575.04 4191.96 4179.44 3962.41 -1575.02 4263.97 4260.56 4044.24 -1578.38 4341.33 4283.81 4067.62 -1579.73 4363.61 4329.09 4113.11 -1582.66 4407.09 4375.01 4159.12 -1586.27 4451.35 4404.20 4188.26 -1589.13 4479.61 4436.84 4220.80 -1592.65 4511.28 4467.44 4251.31 -1595.92 4540.99 4498.82 4282.67 -1598.78 4571.36 4530.11 4314.04 -1601.13 4601.58 26-7un-2006 15:06:15 vertical Displ Displ Total section +N/5- +E/w- displ (ft) (ft) (ft) (ft) 4562.75 4346.80 -1603.40 4633.10 4598.61 4382.72 -1606.36 4667.83 4644.57 4428.45 -1611.73 4712.63 4693.48 4476.87 -1618.80 4760.56 4739.23. 4522.27 -1624.87 4805.32 4789.16 4572.00 -1630.40 4854.01 4834.41 4616.94 -1636.21 4898.30 4884.27 4666.31 -1643.38 4947.24 4930.63 4712.21 -1650.12 4992.78 4979.53 4760.65 -1656.98 5040.77 5027.07 4807.89 -1662.94 5087.36 5074.82 4855.33 -1668.97 5134.17 5121.07 4901.18 -1675.29 5179.59 5170.19 4949.81 -1682.41 5227.92 5197.17 4976.39 -1687,08 5254.59 5228.54 5007.19 -1693.01 5285.66 5263.11 5041.00 -1700.32 5320.03 5290.30 5067.53 -1706.41 5347.12 5322.76 5099.27 -1713.26 5379.39 5352.99 5128.78 -1719.97 5409.50 5383.20 5158.35 -1726.23 5439.53 5414.22 5188.82 -1732.01 5470.26 5445.91 5220.02 -1737.62 5501.63 Page 5 337.36 2.89 BP_MWD+IFR+MS 337.55 3.11 BP_MWD+IFR+MS 337.93 5.85 BPJNWD+IFR+MS 338.32 6.41 BP_MWD+IFR+MS 338.68 5.98 BP_MWD+IFR+MS 338.78 3.75 BPJNWD+IFR+MS 338.95 1.01 BP_MWD+IFR+MS 339.12 2.45 BP_INC+TREND 339.22 17.36 BP_MWD+IFR+MS 339.33 24.01 BP_MWD+IFR+MS 339.42 23.47 BPJNWD+IFR+MS 339.53 10.42 BP~IWD+IFR+MS 339.64 0.00 BP_MWD+IFR+MS Page 6 of 11 At DLS Srvy Tool Azim (deg/ tool Corr (deg) 100f) type (deg) 339 75 1.95 BP_MWD+IFR+MS 339.87 5.83 BPJNWD+IFR+MS 340.00 4.15 BP_MWD+IFR+MS 340.12 3.35 BPJNWD+IFR+MS 340.24 8.52 BP_MWD+IFR+MS 340.37 3.12 BP_MWD+IFR+MS 340.49 4.26 BP_MWD+IFR+MS 340.60 0.08 BPJNWD+IFR+MS 340.70 0.48 BP_MWD+IFR+MS 340.81 1.64 BP_MWD+IFR+MS 340.92 1.97 BP_MWD+IFR+MS 341.03 2.16 BP_MWD+IFR+MS 341.13 1.37 BPJNWD+IFR+MS 341.23 2.80 BPJ~IWD+IFR+MS 341.27 9.81 BP_MWD+IFR+MS 341.32 4.19 BP_MWD+IFR+MS 341.36 11.26 BP_MWD+IFR+MS 341.39 10.69. BP_MWD+IFR+MS 341.43 2.60 BP_MWD+IFR+MS 341.46 2.90 BPJNWD+IFR+MS 341.50 8.54 BP_MWD+IFR+MS 341.54 4.43 BPJNWD+IFR+MS 341.59 6.53 BP_MWD+IFR+MS • C J 144 11451.34 88.15 350.77 31.17 8779.04 L-51_Final 5477.07 _Survey.TXT 5250.77 -1742.71 5532.41 341 64 5 93 145 11483.10 86.71 351.51 31.76 8780.46 5508.79 5282.11 -1747.59 5563.71 . 341.69 . 5.10 146 11514.86 86.54 351.86 31.76 8782.33 5540.48 5313.49 -1752.18 5594.93 341 75 1 22 147 11545.42 86.78 351.74 30.56 8784.12 5570.96 5343.68 -1756.53 5624.97 . 341 80 . 0 88 148 11576.77 87.02 351.56 31.35 8785.81 5602.25 5374.65 -1761.07 5655.82 . 341 86 . 0 96 149 11607.55 87.43 350.94 30.78 8787.30 5632.98 5405.04 -1765.75 5686.15 . 341 91 . 2 41 150 11637.86 87.64 349.79 30.31 8788.60 5663.27 5434.90 -1770.82 5716.11 . 341.95 . 3.85 [(c)2006 IDEAL ID10_2C`O1]0 SCHLUMBERGER Survey Report Seq 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 Measured Incl depth angle __(ft)__ _(deg) 11669.67 87.95 11701.19 86.57 11731.01 85.89 11763.20 86.03 11794.55 85.79 11825.35 86.65 11856.92 87.13 11889.16 86.99 11918.58 87.74 11950.04 87.85 11981.21 12012.29 12043.54 12074.43 12104.16 12134.97 12166.24 12197.03 12227.79 12259.33 12289.30 12320.91 12351.95 12382.85 12414.38 88.33 88.29 88.29 89.90 90.35 90.14 90.18 89.83 88.80 88.25 89.45 88.80 89.59 90.00 90.07 176 12447.16 88.53 177 12476.97 87.70 178 12508.78 87.43 179 12539.74 87.22 Azimuth angle _(deg)_ 349.67 350.38 352.75 352.30 352.21 352.68 352.63 353.04 352.10 350.62 349.78 349.86 350.61 349.98 349.58 351.70 352.77 354.98 358.40 359.21 2.50 5.47 7.05 8.24 8.44 10.72 10.41 9.73 8.91 Course TVD length depth _(ft)_ __(ft)_ 31.81 8789.83 31.52 8791.33 29.82 8793.30 32.19 8795.56 31.35 8797.80 30.80 8799.83 31.57 8801.54 32.24 8803.20 29.42 8804.55 31.46 8805.76 31.17 8806.80 31.08 8807.72 31.25 8808.65 30.89 8809.14 29.73 8809.07 30.81 8808.94 31.27 8808.85 30.79 8808.85 30.76 8809.22 31.54 8810.03 29.97 8810.63 31.61 8811.11 31.04 8811.55 30.90 8811.66 31.53 8811.64 32.78 8812.04 29.81 8813.02 31.81 8814.37 30.96 8815.82 26-7un-2006 15:06:15 Page vertical Displ Displ Total At section +N/5- +E/W- displ Azim (ft) (ft) (ft) (ft) (deg) 5695.05 5466.17 -1776.49 5747 60 342 00 5726.53 5497.18 -1781.94 5778.78 342.04 5756.27 5526.61 -1786.31 5808.12 342.09 5788.34 5558.45 -1790.48 5839.71 342.15 5819.58 5589.43 -1794.70 5870.49 342.20 5850.28 5619.90 -1798.74 5900.74 342.25 5881.77 5651.16 -1802.77 5931.75 342.31 5913.92 5683.11 -1806.78 5963.40 342.36 5943.27 5712.25 -1810.58 5992.33 342.41 5974.69 5743.33 -1815.31 6023.39 342.46 6005.84 5774.03 -1820.61 6054.26 342.50 6036.91 5804.61 -1826.10 6085.07 342.54 6068.15 5835.39 -1831.40 6116.03 342.58 6099.03 5865.83 -1836.60 6146.63 342.61 6128.76 5895.09 -1841.88 6176.13 342.65 6159.56 5925.49 -1846.89 6206.64 342.69 6190.80 5956.47 -1851.11 6237.48 342.74 6221.51 5987.08 -1854.40 6267.69 342.79 6252.04 6017.78 -1856.17 6297.55 342.86 6283.18 6049.31 -1856.83 6327.87 342.94 6312.57 6079.26 -1856.39 6356.38 343.02 6343.21 6110.79 -1854.19 6385.90 343.12 6372.96 6141.64 -1850.80 6414.45 343.23 6402.37 6172.26 -1846.69 6442.60 343.34 6432.25 6203.46 -1842.12 6471.19 343.46 6463.08 6235.78 -1836.67 6500.64 343.59 6490.93 6265.07 -1831.20 6527.20 343.71 6520.73 6296.36 -1825.65 6555.69 343.83 6549.87 6326.88 -1820.64 6583.62 343.95 Page 6 BP_MWD+IFR+MS BP_MWD+IFR+MS BPJNWD+IFR+MS BPJNWD+IFR+MS BP_MWD+IFR+MS BPJNWD+IFR+MS BP_MWD+IFR+MS 7of11 DLS Srvy TOO1 3.10 BP_MWD+IFR+MS 0.29 BPJNWD+IFR+MS 2.40 BP_MWD+IFR+MS 5.60 BPJNWD+IFR+MS 2.03 BP_MWD+IFR+MS 6.91 BP_MWD+IFR+MS 3.42 BPJNWD+IFR+MS 7.27 BP_MWD+IFR+MS 11.61 BPJNWD+IFR+MS 3.10 BP_MWD+IFR+MS (deg/ too Corr 100f) type (deg) 1 04 BP_MWD+IFR+MS 4.92 BPJNWD+IFR+MS 8.25 BP_MWD+IFR+MS 1.46 BP_MWD+IFR+MS 0.82 BP_MWD+IFR+MS 3.18 BP_MWD+IFR+MS 1.53 BPJNWD+IFR+MS 1.34 BP_MWD+IFR+MS 4.08 BP_MWD+IFR+MS 4.71 BP_MWD+IFR+MS 11.68 BP_MWD+IFR+MS 9.62 BP~IWD+IFR+MS 5.69 BP_MWD+IFR+MS 4.07 BP_MWD+IFR+MS 0.67 BP_MWD+IFR+MS 8.39 BP_MWD+IFR+MS 2.97 BPJNWD+IFR+MS 2.30 BP_MWD+IFR+MS 2.73 BPJ~IWD+IFR+MS • L-51_Final_SUrvey.TXT 180 12570.08 86.88 8.69 30.34 8817.38 6578.51 6356.82 -1816.00 6611.13 344.06 1.33 BP_MWD+IFR+MS [(c)2006 IDEAL ID10_2C_O1]o SCHLUMBERGER Survey Report 26-Jun-2006 15:06:15 Page 8 of 11 Seq Measured Incl Azimuth # depth angle angle - __(ft) (deg) (deg) 181 12601.90 86.12 +8 95 182 12633.14 86.60 8.96 183 12664.12 86.53 9.01 184 12694.70 86.23 9.17 185 12726.58 86.26 8.74 186 12756.17 85.95 8.53 187 12788.99 86.71 8.45 188 12820.15 88.18 8.29 189 12851.43 88.66 8.96 190 12882.74 89.31 9.13 191 12913.27 89.73 9.05 192 12943.46 89.52 8.57 193 12974.60 89.86 8.78 194 13006.92 90.34 8.87 195 13038.25 90.72 9.00 196 13069.55 91.58 8.63 197 13100.90 92.71 8.81 198 13131.65 92.78 8.65 199 13162.92 92.16 8.89 200 13192.56 90.62 9.95 201 13223.66 88.35 10.40 202 13255.27 86.81 11.25 203 13285.97 86.67 10.87 204 13316.27 86.74 10.80 205 13347.08 86.50 10.81 206 13378.53 85.85 9.11 207 13408.75 86.16 9.33 208 13441.42 86.19 9.00 209 13472.90 85.19 6.88 210 13503.64 85.16 5.92 Course length (ft) 31.82 31.24 30.98 30.58 31.88 29.59 32.82 31.16 31.28 31.31 30.53 30.19 31.14 32.32 31.33 31.30 31.35 30.75 31.27 29.64 31.10 31.61 30.70 30.30 30.81 31.45 30.22 32.67 31.48 30.74 TVD depth (ft) 8819.32 8821.31 8823.16 8825.09 8827.18 8829.19 8831.29 8832.68 8833.54 8834.10 8834.35 8834.55 8834.72 8834.66 8834.37 8833.75 8832.57 8831.10 8829.75 8829.03 8829.31 8830.65 8832.39 8834.13 8835.95 8838.05 8840.15 8842.33 8844.70 8847.29 vertical Displ Displ Total section +N/S- +E/W- displ (ft) (ft) (ft) (ft) 6608.53 6388.20 -1811.13 6639.98 6637.97 6419.00 -1806.28 6668.30 6667.17 6449.54 -1801.45 6696.41 6695.97 6479.68 -1796.63 6724.15 6726.01 6511.10 -1791.68 6753.12 6753.94 6540.29 -1787.24 6780.09 6784.96 6572.69 -1782.41 6810.08 6814.46 6603.48 -1777.88 6838.63 6844.04 6634.40 -1773.19 6867.27 6873.59 6665.31 -1768.27 6895.88 6902.40 6695.46 -1763.44 6923.79 6930.93 6725.29 -1758.82 6951.47 6960.39 6756.07 -1754.12 6980.08 6990.93 6788.01 -1749.17 7009.75 7020.52 6818.96 -1744.30 7038.52 7050.10 6849.88 -1739.50 7067.30 7079.72 6880.85 -1734.76 7096.16 7108.77 6911.21 -1730.09 7124.46 7138.30 6942.08 -1725.33 7153.27 7166.20 6971.31 -1720.48 7180.48 7195.34 7001.92 -1714.99 7208.89 7224.81 7032.94 -1709.06 7237.62 7253.37 7063.02 -1703.18 7265.47 7281.59 7092.73 -1697.49 7293.03 7310.29 7122.94 -1691.72 7321.08 7339.74 7153.85 -1686.30 7349.91 7368.16 7183.60 -1681.47 7377.77 7398.91 7215.78 -1676.27 7407.93 7428.73 7246.87 -1671.94 7437.24 7458.07 7277.31 -1668.52 7466.14 At Azim (deg) 344 17 344.28 344.39 344.50 344.61 344.72 344.83 344.93 345.04 345.14 345.24 345.34 345.45 345.55 345.65 345.75 345.85 345.95 346.04 346.14 346.24 346.34 346.44 346.54 346.64 346.74 346.83 346.92 347.01 347.09 DLS Srvy Tool (deg/ tool Corr 100f) type (deg) 2.52 BPJNWD+IFR+MS 1.54 BP_MWD+IFR+MS 0.28 BPJ~IWD+IFR+MS 1.11 BP_MWD+IFR+MS 1.35 BPJNWD+IFR+MS 1.26 BP_MWD+IFR+MS 2.33 BP_MWD+IFR+MS 4.75 BPJNWD+IFR+MS 2.63 BP_MWD+IFR+MS 2.15 BP_MWD+IFR+MS 1.40 BP_MWD+IFR+MS 1.74 BP_MWD+IFR+MS 1.28 BPJNWD+IFR+MS 1.51 BP_MWD+IFR+MS 1.28 BPJNWD+IFR+MS 2.99 BP_MWD+IFR+MS 3.65 BP_MWD+IFR+MS 0.57 BP_MWD+IFR+MS 2.13 BPJNWD+IFR+MS 6.31 BP_MWD+IFR+MS 7.44 BPJNWD+IFR+MS 5.56 BP_MWD+IFR+MS 1.32 BP_MWD+IFR+MS 0.33 BP_MWD+IFR+MS 0.78 BPJ~IWD+IFR+MS 5.78 BP_MWD+IFR+MS 1.26 BPJNWD+IFR+MS 1.01 BPJ~IWD+IFR+MS 7.43 BP_MWD+IFR+MS 3.11 BP_MWD+IFR+MS [(c)2006 IDEAL ID10_2C_O1]a SCHLUMBERGER Survey Report 26-Jun-2006 15:06:15 Page 9 of 11 Page 7 • L L-51_Final_Survey.TXT seq Measured # depth - (ft) 211 13535.14 212 13567.19 213 13597.39 214 13629.42 215 13660.36 216 13691.32 217 13722.69 218 13754.17 219 13784.50 220 13816.20 221 13847.07 222 13877.77 223 13909.35 224 13940.57 225 13970.90 226 14004.14 227 14034.68 228 14064.54 229 14097.41 230 14129.57 231 14160.38 232 14192.14 233 14223.95 234 14254.36 235 14285.63 236 14316.98 237 14347.69 238 14378.99 239 14410.43 240 14441.58 Incl Azimuth angle angle (deg) (deg) 85 74 6 03 86.33 7.13 86.57 5.80 87.15 5.75 87.53 5.34 87.33 3.51 87.63 2.91 88.39 4.44 88.56 4.59 88.46 4.57 88.56 4.70 88.56 4.92 88.11 3.92 88.42 3.77 89.07 3.42 89.28 3.43 89.38 4.02 88.35 3'.66 87.63 1.72 87.98 1.80 88.22 1.61 88.63 1.24 88.04 0.43 88.35 1.40 88.11 1.05 87.53 359.51 87.63 359.51 87.74 358.63 87.36 357.48 87.46 356.62 [(c)2006 IDEAL ID10_2C_O1]o course length (ft) 31.50 32.05 30.20 32.03 30.94 30.96 31.37 31.48 30.33 31.70 30.87 30.70 31.58 31.22 30.33 33.24 30.54 29.86 32.87 32.16 30.81 31.76 31.81 30.41 31.27 31.35 30.71 31.30 31.44 31.15 TVD depth (ft) 8849.79 8852.00 8853.87 8855.63 8857.06 8858.45 8859.83 8860.92 8861.73 8862.55 8863.36 8864.13 8865.05 8865.99 8866.66 8867.13 8867.49 8868.08 8869.24 8870.47 8871.49 8872.36 8873.29 8874.24 8875.21 8876.40 8877.70 8878.96 8880.31 8881.71 vertical Displ Displ Total section +N/s- +E/w- displ (ft) (ft) (ft) (ft) 7488.22 7308.54 -1665.25 7495.86 7518.83 7340.30 -1661.59 7526.02 7547.69 7370.25 -1658.20 7554.49 7578.43 7402.07 -1654.98 7584.83 7608.17 7432.83 -1651.99 7614.21 7638.09 7463.67 -1649.61 7643.79 7668.57 7494.96 -1647.85 7673.97 7699.11 7526.36 -1645.83 7704.21 7728.42 7556.58 -1643.45 7733.23 7759.06 7588.17 -1640.92 7763.56 7788.88 7618.93 -1638.42 7793.11 7818.52 7649.51 -1635.85 7822.47 7849.05 7680.98 -1633.42 7852.74 7879.32 7712.12 -1631.33 7882.76 7908.76 7742.38 -1629.42 7911.98 7941.06 7775.56 -1627.44 7944.04 7970.69 7806.03 -1625.45 7973.47 7999.65 7835.82 -1623.46 8002.23 8031.66 7868.63 -1621.91 8034.05 8063.09 7900.75 -1620.93 8065.31 8093.22 7931.53 -1620.01 8095.28 8124.31 7963.27 -1619.22 8126.22 8155.51 7995.06 -1618.76 8157.29 8185.33 8025.45 -1618.27 8186.98 8215.96 8056.70 -1617.60 8217.48 8246.76 8088.03 -1617.45 8248.17 8277.00 8118.71 -1617.71 8278.31 8307.86 8149.98 -1618.22 8309.08 8338.94 8181.37 -1619.29 8340.08 8369.81 8212.45 -1620.89 8370.88 At Azim (deg) 347.16 347.25 347.32 347.40 347.47 347.54 347.60 347.66 347.73 347.80 347.86 347.93 347.99 348.06 348.12 348.18 348.24 348.29 348.35 348.41 348.46 348.51 348.55 348.60 348.65 348.69 348.73 348.77 348.80 348.84 DLS Srvy TOO1 (deg/ tool Corr 100f) type (deg) 1.87 BP_MWD+IFR+MS 3.89 BPJNWD+IFR+MS 4.47 BP_MWD+IFR+MS 1.82 BP_MWD+IFR+MS 1.81 BPJNWD+IFR+MS 5.94 BPJNWD+IFR+MS 2.14 BP_MWD+IFR+MS 5.42 BP_MWD+IFR+MS 0.75 BP_MWD+IFR+MS 0.32 BPJ~IWD+IFR+MS 0.53 BPJNWD+IFR+MS 0.72 BPJNWD+IFR+MS 3.47 BP_MWD+IFR+MS 1.10 BP_MWD+IFR+MS 2.43 BPJNWD+IFR+MS 0.63 BP_MWD+IFR+MS 1.96 BPJNWD+IFR+MS 3.65 BP_MWD+IFR+MS 6.29 BP_MWD+IFR+MS 1.12 BP_MWD+IFR+MS 0.99 BP_MWD+IFR+MS 1.74 BP_MWD+IFR+MS 3.15 BPJ~IWD+IFR+MS 3.35 BP_MWD+IFR+MS 1.36 BP_MWD+IFR+MS 5.25 BP_MWD+IFR+MS 0.33 BP_MWD+IFR+MS 2.83 BP_MWD+IFR+MS 3.85 BPJNWD+IFR+MS 2.78 BP_MWD+IFR+MS SCHLUMBERGER Survey Report 26-7un-2006 15:06:15 Page 10 of 11 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvyr Tool # depth angle angle length depth section +N/5- +E/w- displ Azim (de g/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 241 14472.57 87.67 355.69 30.99 8883.03 8400.58 8243.34 -1622.96 8401.59 348.86 3.07 BP~IWD+IFR+MS Page 8 242 14503.43 243 14533.06 244 14565.69 245 14597.23 246 14627.78 247 14658.91 248 14690.89 249 14720.92 250 14752.52 251 14784.58 252 14815.67 253 14847.42 254 14878.53 255 14909.19 256 14940.66 257 14971.77 258 15002.44 259 15034.33 260 15065.26 261 15096.58 262 15128.31 263 15159.32 264 15190.20 265 15221.61 266 15252.44 267 15282.69 268 15313.47 269 15344.61 270 15375.32 88.11 88.25 88.32 88.42 87.56 87.32 87.15 87.22 86.12 86.26 86.33 86.50 86.50 87.05 87.26 87.63 87.74 88.04 87.43 86.19 86.02 86.36 86.74 86.88 86:84 86.98 87.32 87.39 87.67 355.46 355.66 354.32 355.05 355.40 355.39 356.82 356.62 356.24 356.43 355.75 355.50 355.90 356.80 356.09 356.20 355.69 355.82 355.92 357.08 357.29 357.17 357.56 357.15 357.17 357.54 358.34 358.17 358.51 [(c)2006 IDEAL ID10_2C`O1]0 SCHLUMBERGER Survey Report 30.86 29.63 32.63 31.54 30.55 31.13 31.98 30.03 31.60 32.06 31.09 31.75 31.11 30.66 31.47 31.11 30.67 31.89 30.93 31.32 31.73 31.01 30.88 31.41 30.83 30.25 30.78 31.14 30.71 8884.17 8885.11 8886.08 8886.98 8888.05 8889.44 8890.99 8892.46 8$94.30 8896.43 8898,44 8900.42 8902.32 8904.05 8905.61 8906.99 8908.23 8909.41 8910.63 8912.37 8914.53 8916.59 8918.45 8920.20 8921.88 8923.51 8925.04 8926.48 8927.81 1_Survey.TXT 8274.08 -1625.34 8303.61 -1627.64 8336.10 -1630.48 8367.49 -1633.40 8397.92 -1635.95 8428.92 -1638.44 8460.78 -1640.61 8490.73 -1642.33 8522.21 -1644.29 8554.14 -1646.34 8585.09 -1648.45 8616.69 -1650.87 8647.65 -1653.20 8678.20 -1655.15 8709.57 -1657.10 8740.58 -1659.19 8771.15 -1661.35 8802.93 -1663.71 8833.75 -1665.94 8864.96 -1667.85 8896.58 -1669.40 8927.49 -1670.90 8958.28 -1672.31 8989.61 -1673.76 9020.35 -1675.29 9050.53 -1676.68 9081.25 -1677.79 9112.34 -1678.73 9143.01 -1679.62 26-7un-2006 15:06:15 8432.21 8461.63 8494.06 8525.43 8555.78 8586.68 8618.38 8648.11 8679.39 8711.13 8741.92 8773.41 8804.26 8834.63 8865.81 8896.66 8927.10 8958.76 8989.47 9020.49 9051.85 9082.51 9113.04 9144.10 9174.60 9204.53 9234.94 9265.68 9296.01 348.89 348.91 348.93 348.95 348.98 349.00 349.03 349.05 349.08 349.11 349.13 349.15 349.1$ 349.20 349.23 349.25 349.27 349.30 349.32 349.35 349.37 349.40 349.43 349.45 349.48 349.50 349.53 349.56 349.59 1.61 BP_MWD+IFR+MS 0.82 BP_MWD+IFR+MS 4.11 BP_MWD+IFR+MS 2.34 BP_MWD+TFR+MS 3.04 BP_MWD+IFR+MS 0.77 BPJNWD+IFR+MS 4.50 BP_MWD+IFR+MS 0.70 BPJNWD+IFR+MS 3.68 BPJNWD+IFR+MS 0.74 BPJ~IWD+IFR+MS 2.19 BPJ~IWD+IFR+MS 0.95 BP_MWD+IFR+MS 1.28 BPJNWD+IFR+MS 3.44 BP_MWD+IFR+MS 2.35 BP_MWD+IFR+MS 1.24 BPJNWD+IFR+MS 1.70 BP_MWD+IFR+MS 1.03 BPJNWD+IFR+MS 2.00 BP_MWD+IFR+MS 5.42 BP_MWD+IFR+MS 0.85 BPJ~iWD+IFR+MS 1.16 BP_MWD+IFR+MS 1.76 BP_MWD+IFR+MS 1.38 BP_MWD+IFR+MS 0.15 BP_MWD+IFR+MS 1.31 BPJNWD+IFR+MS 2.82 BPJNWD+IFR+MS 0.59 BP~IWD+IFR+MS 1.43 BP_MWD+IFR+MS Page 11 of 11 seq Measured Incl Azimuth Course TvD vertical Displ Displ Total At # depth angle angle length depth section +N/5- +E/w- displ Azim - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 271 15406.63 87.63 358.49 31.31 8929.09 9326.89 9174.28 -1680.44 9326.92 349.62 272 15438.06 87.87 358.99 31.43 8930.32 9357.91 9205.68 -1681.13 9357.92 349.65 273 15469.68 88.18 0.02 31.62 8931.41 9389.05 9237.28 -1681.40 9389.06 349.68 274 15501.39 88.59 0.19 31.71 8932.31 9420.24 9268.98 -1681.35 9420.24 349.72 275 15532.44 89.01 0.27 31.05 8932.96 9450.76 9300.02 -1681.22 9450.76 349.75 276 15561.86 88.94 359.82 29.42 8933.48 9479.70 9329.44 -1681.20 9479.70 349.78 277 15593.69 88.87 358.92 31.83 8934.09 9511.08 9361.26 -1681.55 9511.09 349.82 Page 9 L-51_Fina 8431.26 8460.72 8493.20 8524.61 8555.00 8585.95 8617.69 8647.46 8678.80 8710.58 8741.41 8772.93 8803.82 8834.22 8865.44 8896.33 8926.79 8958.49 8989.21 9020.27 9051.66 9082.34 9112.89 9143.97 9174.50 9204.44 9234.87 9265.63 9295.97 DLS Srvy TOO1 1.55 BP_MWD+IFR+MS 2.84 BP_MWD+IFR+MS (deg/ too Corr 100f) type (deg) 0 14 BP_MWD+IFR+MS 1.76 BP_MWD+IFR+MS 3.40 BP_MWD+IFR+MS 1.40 BPJ~IWD+IFR+MS 1.38 BP_MWD+IFR+MS • L-SLFina1_Survey.TXT 278 15625.76 89.01 359.12 32.07 8934.69 9542.72 9393.32 -1682.10 9542.74 349.85 0.76 BPJNWD+IFR+MS 279 15683.00 89.01 359.12 57.24 8935.68 9599.19 9450.54 -1682.98 9599.23 349.90 0.00 Proj. to TD [(c)2006 IDEAL iD10_2C_01] • • Page 10 • • Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Christine Mahnken (AOGCC) Well No L-51 Date Dispatched: 29-Jun-06 Installation/Rig Nabors 9ES Dispatched By: Nate Rose LWD Log Delivery V1.1, 10-02-03 Data No Of Prints No of Floppies Surveys 2 1 Please sign and return to: James H. Johnson R2CeiVed By: BP Exploration (Alaska) Inc. Petrotechnical Data Center (LR2-1) C1 900 E. Benson Blvd. , / . Anchorage, Alaska 99508 " Fax:907-564-4005 e-mail address: johnsojhC~bp.com ~ti~-o,~ STATE OF ALASKA ALAS~IL AND GAS CONSERVATION CO SSION ~E~EIVED AUG 0 1 2006 WELL COMPLETION OR RECOMPLETION REPORT AND~~~~ Qrl ~ Gas Cons. Commission e.,.,~___-- 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zoAAC zs.,os zoaa,c zs.,,o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 7/1/2006 12. Permit to Drill Number 206-059 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 6/2/2006 13. API Number 50-029-23309-00-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 6/26/2006 14. Well Name and Number: PBU L-51 FSL, 3859 FEL, SEC. 34, T12N, R11 E, UM 2343 Top of Productive Horizon: 1217' FSL, 156' FEL, SEC. 28, T12N, R11 E, UM 8. KB Elevation (ft): 76.3' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 1234' FSL, 242' FEL, SEC. 21, T12N, R11E, UM 9. Plug Back Depth (MD+TVD) 15683 + 8936 Ft Pool 4b. Location of Well (State Base Plane Coordinates): Surface: x- 583058 y- 5978063 Zone- ASP4 10. Total Depth (MD+TVD) 15683 + 8936 Ft 16. Property Designation: ADL 047447 TPI: x- 581427 y- 5982198 Zone- ASP4 Total Depth: x- 581273 y- 5987494 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N!A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD / GR, MWD / GR /RES / PWD, MWD / GR /RES /DEN / NEU /PERISCOPE, USIT 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD .SETTING DEPTH TVD HOLE AMOUNT SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 109' Surface 109' 42" 260 sx Arctic Set A rox. 9-5/8" 40# L-80 28' 2697' 28' 2694' 12-1/4" 485 sxAS Lite 213 sx Class'G' 7" 26# L-80 26' 10349' 26' 8722' 8-3/4" 420 sx LiteCrete 241 sx Class'G' 3-1/2" 9.2# L-80 10173' 15683' 8646' 8936' 6-1/8" Uncemented Slotted Liner 23. Perforations open to Production (MD + TVD of Top and '24_ TUBING RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD 3-112" Slotted Section 3-1 /2", 9.2#, L-80 10178' 10107' MD TVD MD TVD 10393' - 13121' 8736' - 8832' 13165' - 14222' 8830' - 8873' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 14265' - 15651' 8875' - 8935' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED Downsqueeze 9-5/8" x 7" Annulus with 30 Bbls (145 sx Class'G' Freeze Protect w/ 88 Bbls Diesel 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test Hours Tested PRODUCTION FOR TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing PreSS. Casing Pressure CALCULAreD 24-HOUR RATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submi -° none, state "none". None D T' y~ FED_.. Form 10-407 /2003 CONTINUED ON REVERSE SIDE S BFL au~ o s Zoos ~RIGINA~. 428. GEOLOGIC MARK 29. ORMATION TESTS Include and brie y summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Ugnu 2787' 2734' None Ugnu M 4042' 3934' Schrader Bluff N 4365' 4188' Schrader Bluff O 4572' 4348' Base Schrader Bluff /Top Colville 4973' 4663' H RZ 6773' 6097' Kalubik 7049' 6314' Kuparuk D 7236' 6461' Kuparuk C 7252' 6474' Kuparuk B 7465' 6641' Kuparuk A 7662' 6797' Miluveach 7772' 6886' Kingak 8724' 7641' Sag River 10336' 8717' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore ing is true and correct to the best of my knowledge. `.~~ /~1~ (J / e ~ Signed Terrie Hubbl Title Technical Assistant Date / PBU L-51 206-059 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number Permit No. / A royal NO. Drilling Engineer: Scott Kolstad, 564-5347 INSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multipie completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken. indicate "None". ITeM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only BP EXPLORATION Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date ~ From - To ;Hours Task Code ~ NPT Start: 5/31 /2006 Rig Release: 7/1/2006 Rig Number: Phase -- - - - - 5/31/2006 107:00 - 21:00 ~ 14.00 ~ MOB ~ P ~ ~ PRE 6/1/2006 6/2/2006 6/3/2006 21:00 - 00:00 3.00 RIGU P 00:00 - 07:00 7.00 RIGU P 07:00 - 09:30 2.50 RIGU P 09:30 - 14:30 5.00 RIGU P 14:30 - 15:30 1.00 RIGU P 15:30 - 18:30 3.00 RIGU P 18:30 - 19:00 0.50 RIGU P 19:00 - 19:30 0.50 DIVRTR P 19:30 - 20:30 1.00 DRILL P 20:30 - 23:00 2.50 DRILL P 23:00 - 00:00 1.00 DRILL P 00:00 - 00:30 0.50 DRILL P 00:30 - 12:00 11.50 DRILL P 12:00 - 22:00 10.00 DRILL P 22:00 - 00:00 2.00 DRILL P 00:00 - 01:30 1.50 DRILL P 01:30 - 02:15 I 0.751 DRILL I P 02:15 - 02:45 02:45 - 04:30 04:30 - 05:00 05:00 - 07:00 0.501 DRILL I P 1.751 DRILL I P 0.50 DRILL P 2.00 CASE P PRE PRE PRE PRE PRE PRE PRE PRE PRE SURF SURF SURF SURF SURF SURF SURF SURF SURF SURF SURF SURF Page 1 of 19 Spud Date: 6/1/2006 End: 7/1 /2006 Description of Operations RD the rig floor and lower the derrick. Move the pits away from the sub and mob to L pad. Move the sub off of S-121 and mob to L pad. Move the camp and the shops to L pad. Install diverter system. Move rig into position. Spot mats and herculite. Move the camp and the shop from S pad to L pad. Spot camp, shop and pits. RU interconnect and take on fluid into the pits. Raise the derrick and the cattle chute. Rig accepted ~ 0700 Bridle down and prepare the rig floor. Changeout the 16" air boot to 20" adapter. Finish rigging op the diverter line. Install the surface riser and Dresser sleeve. Secure the secondary containment around the cellar area and the pits. Change out the top drive quill. PU 66 joints of 4" HT40 DP and stand back in the derrick. PU and stand back 4" HWDP and stand back in the derrick. Hold pre-spud meeting with all personnel. Function test the diverter. Witness of the test was waived by Chuck Shieve of the AOGCC. MU jar stand and collar stand and rack back in the derrick PU BHA#1 and RIH. BHA#1: 12-1/4" EP5098 w/3-18's & C-16, 9-5/8" motor w/float at 1.5 with 3/4 R/S & 4.5 stg, NM Lead Collar, NM stab, MW D, NM stab, NM xo, UBHO sub. PJSM. RU Halliburton E-line and Gyrodata gyro. Install blower hose. Spud well and drill 12-1/4" ahead directionally to 1,095', taking gyro surveys every stand, PU - 75k, SO - 72k, ROT - 73k, 710 gpm, 2,300 psi on, 2,050 psi off, 4k tq on, 1 k tq of, 80 rpm, ART - 3.03, AST - 1.08 Spud well and drill 12-1/4" ahead directionally to 2,707' (TD), taking gyro surveys every stand to 1,567', PU - 105k, SO - 95k, ROT - 100k, 710 gpm, 3,060 psi on, 2,800 psi off, 4.5k tq on, 1.2 k tq of, 80 rpm, ART - 5.67, AST - 0.78. Observe considerable hydrates circulated to the surface from 1,940' to 2,707. Circulate and condition the mud at 710 gpm, 2,700 psi, 85 rpm, ROT - 100k. POH without pumps standing back the 4" DP from 2,707' to 1,550'. Worked an -25k tight spot from 1,550' to 1,460'. POH without pumps from 1,460' to 1,250'. Work pipe up to 1,190' where the hole started to swab and saw -25k overpull. RIH to 1,280'. Backream out of the hole from 1,280' to 900' - 600 gpm, 1,900 psi, 80 rpm, 2,000 tq. POH from 900' standing back 4" HWDP to the top of the jar stand at 269'. LD BHA#1. LD 1 x 5" HWDP, jars, 1 x 5" HWDP, saver sub, 2 x NM DC's, NM stab, NM DC, UBHO, NM xo, NM stab, MWD, NM stab, NM lead collar, motor, 12-1/4" bit. Hughes EP5098 graded: 1-3-WT-A-E-1-BT-TD Clear and clean the floor. RU to run 9-5/8" 40# L-80 BTC casing. Make dummy run with casing hanger. MU fillup tool. Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Event Name: DRILL+COMPLETE Start: 5/31/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/1/2006 Rig Name: NABOBS 9ES Rig Number: Date ;From - To ', Hours ! Task Code NPT I Phase I ~ 6/3/2006 ~ 07:00 - 12:30 ~ 5.50 ~ CASE P ~ SURF 12:30 - 13:00 0.50 ~ CEMT P I SURF 13:00 - 16:00 ~ 3.00 ~ CEMT ~ P ~ ~ SURF 16:00 - 18:00 I 2.001 CEMT I P I I SURF 18:00 - 20:00 I 2.001 CEMT I P I I SURF 20:00 - 22:30 2.50 BOPSUFj P SURF 22:30 - 00:00 1.50 WHSUR I P SURF 6/4/2006 00:00 - 03:15 3.25 BOPSU~ P SURF 03:15 - 06:30 3.25 BOPSU P SURF 06:30 - 07:00 I 0.501 BOPSUF# P I I SURF 07:00 - 09:00 2.00 DRILL P INT1 09:00 - 10:00 1.00 DRILL P INT1 10:00 - 11:00 1.00 DRILL P INT1 11:00 - 11:30 0.50 DRILL P INTi 11:30 - 13:30 2.00 DRILL P INT1 13:30 - 14:30 1.00 DRILL P INT1 14:30 - 16:30 2.00 DRILL P INT1 16:30 - 17:30 1.00 DRILL P INT1 17:30 - 18:30 1.00 DRILL P INT1 18:30 - 19:00 0.50 DRILL P INT1 19:00 - 20:30 1.50 DRILL P INT1 20:30 - 21:00 I 0.501 DRILL I P I I INT1 21:00 - 22:00 ~ 1.00 ~ DRILL ~ P ~ ~ INT1 Page 2 of 19 Spud Date: 6/1/2006 End: 7/1 /2006 Description of Operations PJSM. PU and MU 9-5/8" 40# L-80 BTC shoe tract and RIH. All connections below float collar have been Bakerloc'd. Check floats -holding. Continue to PU and RIH with 9-5/8" 40# L-80 BTC surface casing, filling each joint -all connections utilized BOL2000NM thread lubricant and were torqued to mark with 7,500 ftlbs. Circulate the last joint down - 4.5 bpm, 500 psi. RD the casing handling equipment and the fillup tool. Land the casing on the ring and MU the cement head. Circulate and condition the mud prior to pumping cement. Stage up the pumps to 10 bpm, 650 psi. PJSM. Pump 5 bbls H2O, shut down, test lines to 3,500 psi - OK. Pump 80 bbls 10.1 ppg MUDPUSH II spacer @ 5.3 bpm, FCP - 100 psi. Shut down. Drop bottom plug. Pump 388 bbls ArcticSET Lite Class "G" 10.7ppg Lead cement slurry @ 6 bpm, FCP - 380 psi. Pump 44 bbls class "G" 15.8 ppg Tail cement slurry ~ 3.5 bpm, FCP - 510 psi. Shut down. Drop top plug, kick out with 10 bbls H2O. Pump with rig pumps and displace cement ~ 7 bpm, FCP - 800 psi. Slow pumps to 2.5 bpm prior to plug bump, land casing. FCP - 600 psi Bump plug with 189 bbls calculated volume (95% efficiency) with 1,300 psi. Bleed of pressure, check floats - OK. Reciprocated casing throughout cement job until displacing last 20 bbls prior to plug bump. Returned 75 bbls cement to surface. CIP ~ 18:00 hr. RD the cement head, flush the lines and the diverter stack. LD the landing joint. Clean underneath the rotary table. ND the diverter system and secure the Hydril in the cellar. NU the casing head and the tubing spool. Test to 1,000 psi - good. NU BOPE. Pressure test the BOPE and associated equipment to 250 psi / 3,500 psi. Witness of the test was done by James Franks - BP, Roy Hunt - NAD. Witness of the test was waived by Chuck Shieve of the AOGCC. Blow down and RD all testing lines and equipment. Install wear ring. PU and RIH with 60 joints of 4" HT40 DP. Stand back 20 stands of 4" DP in the derrick. PU and RIH with 24 joints of 4" HT40 DP. Stand back 8 stands of 4" DP in the derrick. PU and RIH with 60 joints of 4" HT40 DP. Stand back 20 stands of 4" DP in the derrick. PU and RIH with 60 joints of 4" HT40 DP. Stand back 20 stands of 4" DP in the derrick. Service the rig, crown and top drive. Bring the GR tool, NM stabilizers and saver sub to the rig floor MU and RIH with BHA#2 to 1,010'. BHA #2: 8-3/4" DS70, 6-3/4" motor - 1.5 degree - 4/5 R/S - 7 stg, xo w/float, NM stab, LWD/ARC, MWD, NM dc, NM stab, 2 x NM dc, 5" HWDP, jars, 5" HWDP, xo, 24 x 4" HWDP. Shallow test the MWD -good. Circulate a bottoms up -saw some dehydrated gel balls in the mud - 530 gpm, 1,100 psi. RIH with BHA#2 picking up single joints of 4" DP from the pipe Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To _;- _ __ 6/4/2006 21:00 - 22:00 22:00 - 22:30 22:30 - 23:30 23:30 - 00:00 6/5/2006 00:00 - 01:00 01:00 - 02:15 02:15 - 02:45 02:45 - 03:45 03:45 - 12:00 L-51 L-51 DRILL+COMPLETE NABOBS ALASKA DRILLING I NABOBS 9ES Start: 5/31 /2006 Rig Release: 7/1 /2006 Rig Number: Hours ~ Task I, Code's NPT I Phase L ~ i 1.00 DRILL P INT1 0.50 DRILL P INT1 1.00 DRILL P INT1 0.50 DRILL P INT1 1.00 CASE P INT1 1.25 DRILL P INT1 0.50 DRILL P INT1 1.00 DRILL P INT1 8.251 DRILL I P I I INT1 12:00 - 00:00 I 12.00) DRILL I P 6/6/2006 100:00 - 12:00 I 12.00 I DRILL P 12:00 - 00:00 I 12.001 DRILL I P INT1 INT1 INTi 6/7/2006 100:00 - 06:00 I 6.001 DRILL I P I I INTi 06:00 - 09:00 I 3.001 DRILL I N I DPRB I INT1 09:00 - 12:00 I 3.001 DRILL I N I DPRB I INT1 Page 3 of 19 Spud Date: 6/1 /2006 End: 7/1 /2006 Description of Operations shed to 1,800'. Circulate a bottoms up -saw some dehydrated gel balls in the mud - 530 gpm, 1,480 psi. Continue to RIH with BHA#2 picking up singles from the pipe shed to 2,349'. RIH with BHA#2 on 4" DP from the derrick to 2,540'. Circulate a bottoms up prior to pressure testing the casing - saw some dehydrated gel balls in the mud - 530 gpm, 1,700 psi. RU and pressure test the 9-5/8" 40# L-80 BTC surface casing to 3,500 psi -chart and hold for 30 minutes -good. RIH and drill out the shoe tract, rat hole and 24' of new hole to 2,731'. Displace the hole over to 8.8 ppg LSND fluid. Pull the bit up into the surface casing and perform an LOT to 1,005 psi with 8.8 ppg fluid at a TVD of 2,694' fora 15.99 ppg EMW. Take ECD baselines and drill 8-3/4" hole directionally ahead from 2,731' to 3,688', PU - 117k, SO - 105k, ROT - 113k, 585 gpm, 80 rpm, TO on - 3.2k, TO off - 2.2k, 1,610 psi on, 1,410 psi off, ART - 2.93, AST - 0.97, CECD - 9.67, AECD - 9.67. Drill 8-3/4" hole directionally ahead from 3,688' to 5,380', PU - 135k, SO - 115k, ROT - 125k, 585 gpm, 80 rpm, TO on - 5.9k, TO off - 3k, 2,400 psi on, 1,960 psi off, ART - 3.48, AST - 3.31, CECD - 9.8, AECD - 10.15. Pumped a 30 bbl hi-visc sweep at 3,858' - -5% increase in cuttings over the shakers. Pumped a 30 bbl 2 ppg over MW weighted sweep - -50% increase in cuttings w/small clay balls across the shakers. Drill 8-3/4" hole directionally ahead from 5,380' to 6,555', PU - 159k, SO - 129k, ROT - 146k, 585 gpm, 80 rpm, TQ on - 6.9k, TO off - 4.1 k, 2,945 psi on, 2,375 psi off, ART - 5.23, AST - 3.28, CECD - 9.75, AECD - 10.14. Pumped a 30 bbl 2 ppg over MW weighted sweep ~ 5,756' - -25% increase in cuttings across the shakers. Drill 8-3/4" hole directionally ahead from 6,555' to 7,766', PU - 175k, SO - 137k, ROT - 155k, 550 gpm, 80 rpm, TO on - 8k, TO off - 6k, 3,760 psi on, 3,160 psi off, ART - 4.83, AST - 2.87, CECD - 11.21, AECD - 11.47. Increased MW to 10.4 ppg C~ 6,647'. Pumped a 30 bbl 2 ppg over MW weighted sweep 7,674' - -10% increase in cuttings across the shakers. Drill 8-3/4" hole directionally ahead from 7,766' to 8,326', PU - 191 k, SO - 143k, ROT - 162k, 550 gpm, 80 rpm, TO on - 8.5k, TO off - 6k, 3,920 psi on, 3,445 psi off, CECD - 11.21, AECD - 11.35. AST - 2.46, ART - 3.13. Started weight up of mud system to 11.8 ppg C~3 8,200'. Lost total circulation with 58 bbls short of having 11.8 ppg back to surface. Static losses - 69 bph. No returns while pumping. Pump 40 bbl, 40 ppb LCM pill consisting of 40 ppb MIX II Course, ~ 62 gpm, 500 psi, PU - 180k, SO - 152k, ROT - 166k, 15 rpm, 3.8k TO. No circulation while pumping pill. No static losses. Slight trickle of mud down flowline while pumping pill when pipe is being picked up. Cut mud weight to 11.4 ppg. Pump 40 bbl, 45 ppg LCM pill Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Page 4 of 19 Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Spud Date: 6/1/2006 Event Name: DRILL+COMPLETE Start: 5/31/2006 End: 7/1/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 7/1/2006 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT ~ Phase ~ Description of Operations 6/7/2006 ~ 09:00 - 12:00 ~ 3.00 ~ DRILL ~ N ~ DPRB ~ INT1 ~ consisting of 30 ppb MIX II Course, 10 ppb MI Seal Med, 5 ppb 12:00 - 13:00 I 1.001 DRILL I N I DPRB I INT1 13:00 - 14:30 I 1.501 DRILL I N I DPRB I INT1 14:30 - 15:30 I 1.001 DRILL I N I DPRB I INT1 15:30 - 18:30 I 3.001 DRILL I N I DPRB I INT1 18:30 - 00:00 I 5.501 DRILL I N I DPRB I INT1 6/8/2006 100:00 - 05:00 I 5.001 DRILL I N I DPRB I INT1 05:00 - 09:00 I 4.001 DRILL I N I DPRB I INTi 09:00 - 12:30 I 3.501 DRILL I N I DPRB I INT1 12:30 - 14:30 I 2.001 DRILL I N I DPRB I INT1 14:30 - 16:30 I 2.001 DRILL I N I DPRB I INT1 16:30 - 17:30 1.00 DRILL N DPRB INT1 17:30 - 19:00 1.50 DRILL N DPRB INT1 19:00 - 19:30 0.50 DRILL P INT1 19:30 - 20:00 0.50 DRILL N DPRB INT1 20:00 - 22:30 2.50 DRILL N DPRB INT1 22:30 - 00:00 1.50 DRILL N DPRB INT1 G-SEAL. 62 gpm, 500 psi, PU - 180k, SO - 152k, ROT - 166k, 15 rpm, 3.8k TO. No circulation while pumping pill. No static losses. 458 bbls mud lost for tour. Work pipe and prepare pits for trip out of hole. Cut surface mud weight to 11.1 ppg. PU - 185k, SO - 140k. No static losses. Backream from 8,326' to 7,767'. 65 gpm, 450 psi, 50 rpm, 5-8k TO, ROT - 150k. Loss rate equal to pump rate. No static losses. Work pipe while mixing 100 bbl 60 ppb LCM pill. PU - 180k, SO - 130k. No static losses. Backream from 7,767' to 7,310' working through tight spots, packing off and stalling out rotary. 90 gpm, 500 psi, 50 rpm, 5-14k TO. Pump out from 7,310 to 6,460'. 67 gpm 450 psi. No returns while backreaming and pumping out. No static tosses. Pump 100 bbl 60 ppg LCM pill consisting of 15 ppb G-SEAL, 10 ppb MIX II Med, 10 ppb MI Seal Med, 10 ppb Safe Carb 250, 15 ppb Nut Plug Fine. 67 gpm, 450 psi, 15 rpm, 3k TO, ROT - 135k. Cleared pipe with 11.1 ppg mud plus extra 100 bbls to place pill at base of Kuparuk. No circulation while pumping. No static losses. 495 bbls mud lost for tour. 953 bbls total lost for day. Observe well -well static, 11.1 ppg MW. POH from 6,460' to 4,690' pumping out with no retums. Not able to pull dry due to swabbing and overpull. 62 gpm, 450 psi, PU - 175k, SO - 125k. Backream through tight hole from 4,690' to 4,565' with no returns. 62 gpm, 400 psi, 40 rpm,14-17k TO. POH from 4,565' to 3,305' OK, pumping out with no returns until ghost reamer at surface (bit depth 3,885'). Reamer was balled with no flow path. 86 gpm, 420 psi, PU - 160k, SO - 85k. Lost 506 bbls from 00:00 hr to 12:00 hr. Circulate bottoms up 4 times C~2 shoe without losses. Stage pumps up to 490 gpm, 1,380 psi, 40 rpm, 5k TO. Returned moderate amount of LCM and clay balls to surface with bottoms up. Gained 172 bbls while circulating. Shut down pump. Well flowing back. Monitor well and record volume increases in 5 minute increments. Initial flowback - 10 bbls - 5 minutes, final flowback - 1 bbl - 5 minutes. Well determined to be breathing. Gained total of 96 bbls. POH from 2,635 to 340'. Monitor well @ BHA. Breathed back 8 bbls in 10 min. Stand back jar and DC stands. Break bit, laydown MW D and motor. Foowback reduced to trickle. Service rig and topdrive. Make up dumb iron BHA. Bit - NB STAB -Float Sub - (4) 5" HWDP -Jar - (4) 5" HWDP - XO - (24) 4" HWDP. Run in hole from 1,023' with BHA #3 to 2,648' C~ 50 fpm. Circulate bottoms up 2 times by staging pumps to 410 gpm, 540 psi for 1st circulation and increasing to 520 gpm, 820 psi for second bottoms up. Full returns and no mud gain throughout circulation. 100 rpm, 800 fUlbs TO, PU, SO, ROT - Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Page 5 of 19 Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Spud Date: 6/1/2006 Event Name: DRILL+COMPLETE Start: 5/31/2006 End: 7/1/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/1 /2006 Rig Name: NABOBS 9ES Rig Number: Date From - To ~; Hours Task 1 Code NPT Phase ~~~ Description of Operations 6/8/2006 122:30 - 00:00 ~ 1.50 ~ DRILL N 6/9/2006 ~ 00:00 - 00:30 0.50 ~ DRILL N 00:30 - 01:00 I 0.501 DRILL I N 01:00 - 01:30 0.50 DRILL N 01:30 - 02:30 1.00 DRILL N 02:30 --03:00 0.50 DRILL N 03:00 - 04:00 1.00 DRILL N 04:00 - 04:30 I 0.501 DRILL I N 04:30 - 06:00 I 1.501 DRILL I N 06:00 - 06:30 0.50 DRILL N 06:30 - 07:30 1.00 DRILL N 07:30 - 08:00 0.50 DRILL N 08:00 - 11:00 3.00 DRILL N 11:00 - 12:00 1.00 DRILL N 12:00 - 16:00 4.00 DRILL N 16:00 - 17:30 1.50 DRILL N 17:30 - 18:30 1.00 DRILL N 18:30 - 19:00 0.50 DRILL N 19:00 - 19:30 0.50 DRILL N DPRB INT1 90k. Returned moderate amount of LCM and cuttings back to surface with 1st bottoms up. 0 losses for tour, gained 298 bbls from breathing (for tour), 1,161 bbls total loss for well. DPRB INT1 RIH from 2,648' to 3,605' without problems. PU - 94k, SO - 90k. DPRB INT1 Circulate bottoms up 2 times by staging pumps to 500 gpm, 540 psi for 1st circulation and increasing to 550 gpm, 1,135 psi for second bottoms up. Full returns and no mud gain throughout circulation. 100 rpm, 1.1 k TO, ROT - 101 k. Returned small amount of LCM and clay balls back to surface with 1st bottoms up. DPRB INT1 RIH from 3,605' to 4,562' without problems. PU - 123k, SO - 109k. DPRB INT1 Circulate bottoms up after staging pumps to 550 gpm, 1,385 psi. Full returns and no mud gain throughout circulation. 100 rpm, 2k TO, ROT - 113k. Returned small amount of LCM back to surface with bottoms up. DPRB INT1 RIH from 4,562' to 5,518' without problems. PU - 143k, SO - 116k. DPRB INT1 Circulate bottoms up after staging pumps to 550 gpm, 1,685 psi. Full returns and no mud gain throughout circulation. 100 rpm, 2.9k TO, ROT - 124k. Returned small amount of LCM back to surface with bottoms up. DPRB INTi RIH from 5,518' to 6,467'. Set down ~ 5,560'. Pick up to 5,518' and wash from 5,518' to 5,702', 300 gpm, 820 psi. Ran in hole OK from 5,702' to 6,467'. DPRB INTi Circulate bottoms up after staging pumps to 550 gpm, 1,890 psi. Full returns and no mud gain throughout circulation. 100 rpm, 3.7k TO, ROT - 136k. Returned large amount of LCM back to surface with bottoms up. DPRB INTi RIH from 6,467' to 7,400'. Tight ~ 7,045', work through without problem. DPRB INT1 Circulate bottoms up after staging pumps to 550 gpm, 2,140 psi. Full retums and no mud gain throughout circulation. 100 rpm, 4.8k TQ, ROT - 144k. Returned light to moderate amount of LCM back to surface with bottoms up. DPRB INT1 RIH from 7,400' to 8,146' - OK. Wash last stand down to bottom ~ 8,326'. Took 10k weight ~ 8,252' then fell through. DPRB INTi Circulate bottoms up after staging pumps to 558 gpm, 2,400 psi. Full returns and no mud gain throughout circulation. 100 rpm, 6k TO, ROT - 160k. Returned moderate amount of LCM back to surface with bottoms up. Slow pumps after bottoms up to 497 gpm, 2,080 psi. DPRB INT1 Monitor well. 4 bbls breathe back. 93 bbls total back during tripping in hole from midnight. DPRB INT1 POH from 8,326' to BHA without problem and had proper pipe displacement. DPRB INT1 PJSM. Laydown dumb iron BHA (#3). DPRB INT1 PJSM. Pick up and make up directional drilling assembly BHA #4. DPRB INT1 Run in hole with BHA #4 on 4" drill pipe from 274' to 1,010'. DPRB 1NT1 Shallow hole test MWD, 509 gpm, 1,130 psi - OK. Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date From - To i Hours ~ Task ~~, Code ~ NPT Start: 5/31 /2006 Rig Release: 7/1/2006 Rig Number: Page 6 of 19 Spud Date: 6/1 /2006 End: 7/1 /2006 Phase Description of Operations 6/9/2006 19:30 - 20:00 0.50 DRILL N DPRB INT1 20:00 - 21:00 1.00 DRILL N DPRB INT1 21:00 - 21:30 I 0.501 DRILL I N I DPRB I INT1 21:30 - 00:00 2.501 DRILL N ~ DPRB INT1 6/10/2006 100:00 - 01:30 I 1.501 DRILL I P I I INT1 01:30 - 04:30 I 3.001 DRILL I P I I INT1 04:30 - 06:00 1.50 DRILL N RREP INT1 06:00 - 11:00 5.00 DRILL P INT1 11:00 - 12:00 1.00 DRILL N RREP INT1 12:00 - 15:30 3.50 DRILL P INT1 15:30 - 16:30 1.00 DRILL N RREP INT1 16:30 - 17:30 1.00 DRILL P INT1 17:30 - 18:30 1.00 DRILL N RREP INT1 18:30 - 00:00 5.50 DRILL P INT1 6/11/2006 100:00 - 12:00 I 12.001 DRILL I P I I INT1 Continue running in hole from 1,010' to 2,635'. Slip and cut 60' drilling line. Service topdrive, crown, and traveling blocks. Circulate bottoms up after staging pumps to 525 gpm, 1,495 psi. Full returns throughout circulation. 80 rpm, 1 k TO, PU - 100k, SO - 90k, ROT - 90k. Continue running in hole from 2,635' to 8,220' without problem. Washed last stand down to 8,326'. Filled pipe every 2,000' and had proper pipe displacement on trip . No mud losses for day. Breathed back total of 93 bbls for day, none after 12:00 hr. 1,068 bbls total lost to well. Circulate bottoms up staging pumps to 550 gpm, 3,030 psi. Full returns throughout circulation. 80 rpm, 7.1 k TO, PU - 191 k, SO - 143k, ROT - 160k. Acquire slow pump rates. Drill 8-3/4" hole directionally ahead from 8,326' to 8,561', PU - 191 k, SO - 143k, ROT - 162k, 550 gpm, 3,420 psi on, 3,000 psi off, 80 rpm, TO on - 8.5k, TO off - 7k, CECD - 11.71, AECD - 11.60. Circulate ~ 257 gpm, 900 psi while changing valves and seat on #1 mud pump. 50 rpm, 7k TO. Drill 8-3/4" hole directionally ahead from 8,561' to 8,805', PU - 208k, SO - 136k, ROT - 168k, 550 gpm, 3,640 psi on, 3,325 psi off, 80 rpm, TO on - 8.3k, TO off - 7.3k, CECD - 11.81, AECD - 11.87. Circulate @ 273 gpm, 1,125 psi while changing swab and liner on #1 mud pump. 50 rpm, 7.1 k TO. Drill 8-3/4" hole directionally ahead from 8,805' to 8,908', PU - 204k, SO - 135k, ROT - 171 k, 550 gpm, 4,005 psi on, 3,450 psi off, 80 rpm, TO on - 9.6k, TO off - 7k, CECD - 11.91, AECD - 11.98. Circulate ~ 252 gpm, 1,010 psi while changing swab, liner, valve and seat on #2 mud pump. 50 rpm, 6.6k TO. Drill 8-3/4" hole directionally ahead from 8,908' to 8,942', PU - 204k, SO - 135k, ROT - 171 k, 550 gpm, 4,005 psi on, 3,450 psi off, 80 rpm, TO on - 9.6k, TO off - 7k, CECD - 11.91, AECD - 11.98. Circulate ~ 252 gpm, 1,015 psi while changing valve and seat on #1 mud pump. 50 rpm, 6.7k TO. Drill 8-3/4" hole directionally ahead from 8,942' to 9,069', PU - 213k, SO - 144k, ROT - 174k, 540 gpm, 4,030 psi on, 3,560 psi off, 80 rpm, TO on - 9.9k, TO off - 7k, CECD - 12.25, AECD - 12.00. AST - 6.55 hrs., ART - 4.2 hrs. *Started 10 bph loss rate @ 8,920 to 8,975' for 1.25 hrs, then gained the loss back. No losses for day. 1,068 bbls total loss for well. Drill 8-3/4" hole directionally ahead from 9,069' to 9,850', PU - 225k, SO - 140k, ROT - 175k, 500 gpm, 3,810 psi on, 3,385 psi off, 80 rpm, TO on - 10.1 k, TO off - 6.6k, CECD - 12.04, AECD - 12.21. AST - 7.01 hrs., ART - 3.79 hrs. *~ 9,090' started losing appx 60 bph. Increased mix rate of LCM from 4 sacks / hr to 10 sacks / hr. Slowed pump rate to Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Date ~ From - To ~ Hours ~ Task Code j NPT i - - -- 6/11/2006 ~ 00:00 - 12:00 ~ 12.00 ~ DRILL P 12:00 - 22:30 I 10.501 DRILL I P Start: 5/31 /2006 Rig Release: 7/1/2006 Rig Number: Phase INT1 INT1 22:30 - 23:00. I 0.501 DRILL I N I RREP I INT1 23:00 - 00:00 I 1.001 DRILL I P I I INT1 6/12/2006 100:00 - 01:00 I 1.001 DRILL I N I RREP I INTi 01:00 - 03:30 I 2.501 DRILL I P I I INT1 03:30 - 05:30 I 2.001 DRILL I P I I INT1 05:30 - 12:00 I 6.501 DRILL I P I I INT1 12:00 - 12:30 0.50 DRILL P INT1 12:30 - 13:00 0.50 DRILL P INT1 13:00 - 14:00 1.00 DRILL P INT1 14:00 - 14:30 0.50 DRILL P INT1 14:30 - 16:00 ~ 1.50 ~ DRILL P INT1 16:00 - 17:00 I 1.001 DRILL I P I I INT1 17:00 - 18:00 1.00 DRILL P INT1 18:00 - 19:30 1.50 DRILL P INT1 19:30 - 21:30 I 2.001 DRILL I P I I INT1 Page 7 of 19 Spud Date: 6/1 /2006 End: 7/1 /2006 Description of Operations 500 gpm. Losses evened out (d 16 bph until sliding from 9,800', then started gaining back lost mud. Lost net total of 327 bbls from midnight. Drill 8-3/4" hole directionally ahead from 9,850' to 9,952', PU - 234k, SO - 141 k, ROT - 177k, 500 gpm, 4,000 psi on, 3,520 psi off, 80 rpm, TO on - 9.9k, TO off - 7k, CECD - 12.04, AECD - 12.04 Circulate while changing swab and liner in #1 mud pump. 255 gpm, 1,160 psi, 60 rpm, 8.3k TO. Drill 8-3/4" hole directionally ahead from 9,952' to 9,954', PU - 234k, SO - 141 k, ROT - 177k, 500 gpm, 4,000 psi on, 3,520 psi off, 80 rpm, TO on - 9.9k, TO off - 7k, CECD - 12.04, AECD - 12.04. AST - 3.25 hrs, ART - 0.0 hrs. Gained 182 bbls for tour for a net loss of 145 bbls for the day, 1,213 bbls total for well. Circulate while changing all valves, seats, liners, and swabs on #2 mud pump. 250 gpm, 1,120 psi, 80 rpm, 8.5k TO. Drill 8-3/4" hole directionally ahead from 9,954' to 10,006', PU - 234k, SO - 141 k, ROT - 177k, 500 gpm, 4,000 psi on, 3,520 psi off, 80 rpm, TQ on - 9.9k, TO off - 7k, CECD - 12.04, AECD - 12.04. No loss, no gain while drilling. Not getting necessary doglegs to reach target. Need 6 deg doglegs, getting 3 deg doglegs. Circulate for trip for bit and motor. Circulate 1st bottoms up ~ 500 gpm, 3,600 psi, 80 rpm, 8.5 k TO, no mud losses. No increase in cuttings back to surface on bottoms up. Pump 30 bbl high vis sweep surface to surface ~ 550 gpm, 4,100 psi, 80 rpm, 8.3k TO, CECD - 12.04. AECD - 11.97. No mud losses. No increase in cuttings back to surface when sweep returned to surface. 11.6 ppg mud weight. Pumped 25 bbl 1.5 Ib over MW dry job. Monitor well -breathed back 37 bbls total. POH from 10,006' to 8,227'. Monitor well -static. Pump 25 bbl 1.5 Ib over MW dry job. Continue POH from 8,227' to 398'. Lost 23 bbls from midnight. Laydown BHA #4. No visible wear or damage to bit and motor. Clear and clean rig floor. PJSM. Make up BHA #5. Pick up and make up new MXL-1 bit and 1.83 ABH motor, drop bottom STAB. Run in hole from 262' to 1,100'. Shallow hole test MWD - OK. 492 gpm, 1,405 psi. Continue running in hole from 1,100'to 3,867'. Started pushing mud away. Circulate bottoms up staging pumps to 529 gpm, 2,365 psi. PU - 115k, SO - 100k. Returned clayballs and pieces of coal with bottoms up. Minimal losses. Continue running in hole from 3,867' to 6,536' without problems. Circulate bottoms up staging pumps to 529 gpm, 3,185 psi. PU - 150k, SO - 115k. Returned clayballs with bottoms up. Lost 48 bbls prior to getting bottoms up. No losses after bottoms up. Continue running in hole from 6,536' to 8,240' with tight spots at 7,275', 7,445', 7,700'. Set down at 8,240' and attempt to Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Page 8 of 19 Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Spud Date: 6/1/2006 Event Name: DRILL+COMPLETE Start: 5/31/2006 End: 7/1/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/1/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To ' Hours ~ Task Code NPT ( Phase 6/12/2006 19:30 - 21:30 2.00 DRILL P INT1 21:30 - 22:30 1.00 DRILL P INT1 22:30 - 00:00 I 1.501 DRILL I P 6/13/2006 00:00 - 01:30 1.50 DRILL N 01:30 - 04:00 2.50 DRILL N 04:00 - 10:00 I 6.001 DRILL I N 10:00 - 12:00 I 2.001 DRILL I N 12:00 - 12:30 0.50 DRILL N 12:30 - 13:00 0.50 DRILL N 13:00 - 13:30 0.50 DRILL N 13:30 - 14:30 1.00 DRILL N 14:30 - 15:00 0.50 DRILL N 15:00 - 17:00 2.00 DRILL N 17:00 - 18:00 1.00 DRILL P 18:00 - 00:00 6.00 DRILL P 6/14/2006 100:00 - 06:00 l 6.001 DRILL I P 06:00 - 07:30 I 1.501 DRILL I P 07:30 - 07:45 l 0.251 DRILL I P 07:45 - 09:00 I 1.251 DRILL I P INT1 DPRB INT1 DPRB INT1 DPRB INT1 DPRB INT1 DPRB INT1 DPRB INT1 DPRB INT1 DPRB INT1 DPRB INT1 DPRB INT1 INT1 INT1 INT1 INT1 INT1 INT1 Description of Operations work through without pumping. Wash from 8,240' to 8,400'. Run in hole dry from 8,400' to 8,970'. Wash through partial blockages at 8,970' and 9,150'. Continue running in hole from 9,150' to 9,994' with partial pipe displacement. Circulate with partial returns staging pumps to 400 gpm with no improvement. 2,820 psi, 40 rpm, 9k TO, 177k ROT. Back down on pumps to 200 gpm with no improvement, then to 60 gpm with same results. Lost 503 bbls from noon. Lost 526 bbls for day, 1,739 total bbls for well. Work pipe without pumping while mixing LCM pill. Pump 45 bbls, 45 ppb LCM pill consisting of 30 ppb MIX II course, 10 ppb MI SEAL medium, 5 ppb G-SEAL @ 60 gpm, 430 psi. No returns while pumping pill down drill pipe. Gained partial returns (10%) with pill in annulus. Monitor well -static after breathing back 26 bbls. POH from 9,994' to 6,442'. Hole swabbing when pulling dry. Pump out of hole without rotating ~ 60 gpm, 320 psi. No drag. Returns slightly increasing as trip progressed. Circulate, staging pumps up to 360 gpm, 1,750 psi with 95% returns. *Lost total of 138 bbls from midnight. Run in hole from 6,442' to 7,376'.. 80 bbls mud breathed back. Circulate, staging pumps up to 490 gpm, 2,960 psi. Lost apex 60 bbls before getting bottoms up. Full returns after bottoms up. PU - 177k, SO - 128k, RT - 150k. Run in hole from 7,376' to 8,308'. 50 bbls mud breathed back. Circulate, staging pumps up to 490 gpm, 3,170 psi. Lost appx 55 bbls before getting bottoms up. Full returns after bottoms up. PU - 204k, SO - 134k, RT - 160k. Run in hole from 8,308' to 8,800'. 46 bbls mud breathed back. Wash from 8,800' to 9,994' with minimal losses, appx.l0 bbls. 328 gpm, 1,850 psi, 40 rpm, 6.5k TO Circulate bottoms up, staging pumps up to 500 gpm, 3,710 psi. Lost appx 10 bbls before getting bottoms up. Full returns after bottoms up. 40 rpm, 8.8k TO, PU - 240k, SO - 140k, RT - 175k, CECD - 11.94, AECD - 11.88. Drill 8-3/4" hole directionally ahead from 10,006' to 10,088', PU - 251 k, SO - 135k, ROT - 176k, 500 gpm, 3,845 psi on, 3,670 psi off, 45 rpm, TO on - 8.9k, TO off - 7k, CECD - 11.94, AECD - 11.81. AST - 1.02 hrs, ART - 0.92 hrs. Gained 159 bbls for tour for a net gain of 21 bbls for the day. Total lost for well - 1,718 bbls. Drill 8-3/4" hole directionally ahead from 10,088' to 10,300', PU - 235k, SO - 140k, ROT - 175k, 500 gpm, 3,810 psi on, 3,670 psi off, 45 rpm, TO on - 8.7k, TO off - 8.3k, CECD - 11.94, AECD - 11.91. 'No mud losses. Circulate bottoms up for samples C~3 500 gpm, 3,735 psi, 45 rpm, 8.3 TO, CECD - 11.90, AECD - 11.88. Drill 8-3/4" hole from 10,300' to 10,305'. PU - 235k, SO - 140k, ROT - 175k, 500 gpm, 3,760 psi on, 3,735 psi off, 45 rpm, TQ on - 9.1 k, TO off - 8.3k, CECD - 11.94, AECD - 11.82. Circulate bottoms up for samples C«? 500 gpm, 3,735 psi, 45 Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Page 9 of 19 Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Spud Date: 6/1/2006 Event Name: DRILL+COMPLETE Start: 5/31/2006 End: 7/1/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/1/2006 Rig Name: NABOBS 9ES Rig Number: Date ~i From - To Hours Task I! Code NPT Phase ~~~ Description of Operations ----__! - -- I- ---__ - 6/14/2006 07:45 - 09:00 1.25 DRILL P INT1 rpm, 8.3 TO, CECD - 11.90, AECD - 11.88. 09:00 - 09:15 0.25 DRILL P INT1 Drill 8-3/4" hole from 10,305' to 10,315'. PU - 235k, SO - 140k, 09:15 - 10:45 1.50 (DRILL ! P 10:45 - 11:00 ( 0.251 DRILL I P 11:00 - 12:30 1 1.501 DRILL I P 12:30 - 12:45 0.25 DRILL P 12:45 - 14:15 1.50 DRILL P 14:15 - 14:30 0.25 DRILL P 14:30 - 16:00 1.50 DRILL P 16:00 - 16:15 0.25 DRILL P 16:15 - 18:30 2.25 DRILL P 18:30 - 18:45 ! 0.25! DRILL ! P 18:45 - 21:00 I 2.251 DRILL I P 21:00 - 00:00 I 3.001 DRILL I P 6/15/2006 ~ 00:00 - 01:00 1.00! DRILL P 01:00 - 02:30 I 1.501 DRILL I P 02:30 - 04:00 I 1.501 DRILL I P 04:00 - 05:00 1.00 DRILL P 05:00 - 07:00 2.00 DRILL P 07:00 - 07:30 0.50 BOPSU P 07:30 - 08:30 1.00 BOPSU P 08:30 - 09:30 1.00 BOPSU P 09:30 - 12:00 2.50 CASE P 12:00 - 17:30 5.50 CASE P ROT - 175k, 500 gpm, 3,760 psi on, 3,735 psi off, 45 rpm, TO on - 9.1 k, TO off - 8.3k, CECD - 11.94, AECD - 11.82. INT1 Circulate bottoms up for samples ~ 500 gpm, 3,665 psi, 45 rpm, 8.3 TO, CECD - 11.90, AECD - 11.80. INT1 Drill 8-3/4" hole from 10,315' to 10,325'. PU - 235k, SO - 140k, ROT - 175k, 500 gpm, 3,780 psi on, 3,635 psi off, 45 rpm, TO on - 9.Ok, TO off - 8.3k, CECD - 11.94, AECD - 11.82. INT1 Circulate bottoms up for samples C~ 500 gpm, 3,645 psi, 45 rpm, 9k TO, CECD - 11.94, AECD - 11.80. INT1 Drill 8-3/4" hole from 10,325' to 10,335'. INT1 Circulate bottoms up for samples ~ 500 gpm, 3,670 psi, 45 rpm, 9k TO. CECD - 11.94, AECD - 11.80. INT1 Drill 8-3/4" hole from 10,335' to 10,340'. INT1 Circulate bottoms up for samples ~ 500 gpm, 3,670 psi, 45 rpm, 9k TO. CECD - 11.94, AECD - 11.80. INT1 Drill 8-3/4" hole from 10,340' to 10,345'. INT1 Circulate bottoms up for samples ~ 500 gpm, 3,670 psi, 45 rpm, 9k TO. CECD - 11.94, AECD - 11.80. Trace of Sag River sand in samples INTi Drill 8-3/4" hole from 10,345' to 10,350' MD, 8722.6' TVD. TD C~3 18:45 hr, 6/14/2006. INT1 Circulate bottoms up for samples ~ 500 gpm, 3,670 psi, 45 rpm, 9k TO. CECD - 11.94, AECD - 11.80. Trace of Sag River sand in samples. ~ Estimated top of Sag River @ 10,344' MD, 8720' TVD INTi Monitor well -static. POH to run 7" from 10,350' to 6,723' with proper pipe displacement and no drag. *No losses or gains for day. Total loss for well - 1,718 bbls. INT1 Spot 300 bbl 10 ppb G-Seal LCM pill in annulus @ 350 gpm, 1,640 psi. Pump 17 bbl 1.5 ppg over MW dry job. INT1 Continue POH to run 7" casing from 6,723' to 2,527' with correct pipe displacement and without problems. INT1 Cut and slip drilling line. Service topdrive, crown and drawworks. INT1 POH from 2,527' to 262'. INT1 Laydown BHA #5. *No mud losses or gains. *Jars came out of the hole in the cocked position* INT1 Pull wear bushing. INT1 Change out top pipe rams from 3.5" x 6" VBR's to 7". INT1 Test ram door seals to 250 psi low pressure, 3,500 psi high pressure - OK. INT1 Make dummy run with 7" fluted hanger. Rig up to run 7" casing. INT1 PJSM. Pick up, make up 7" shoe track with Baker Lok. Rig up casing fill-up tool. Check floats - OK. Continue RIH with 65 jts 7" 26# L-80 BTC-M casing to 2,686'. BTC-M make up torque - 8,600 fUlbs, lubricated with Best-O-Life 2000 NM. Fill every joint with casing fill-up tool, circulate down every 5 joints for 3 minutes ~ 4 bpm, 200 psi, 1-1/2 minute per joint running speed, slowing down to 2 minutes per joint when pipe started Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Operations Summary Report Legal Well Name: L-51 Page 10 of 19 Common Well Name: L-51 Spud Date: 6/1/2006 Event Name: DRILL+COMPLETE Start: 5/31/2006 End: 7/1/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/1/2006 Rig Name: NABOBS 9ES Rig Number: Date j From - To Hours Task Code NPT Phase ~ Description of Operations 6/15/2006 12:00 - 17:30 5.50 CASE P INT1 pushing mud away. Hole taking pipe displacement 17:30 - 18:00 0.50 CASE P INT1 Circulate 1-1/2 bottoms up by staging pump to 174 gpm, 240 psi with full returns. PU - 104k, SO - 100k. Returned trace of G-Seal back to surface. 18:00 - 21:00 3.00 CASE P INT1 Continue run in hole with 7" casing from 2,676' to 3,940'. Fill every joint, circulate down every 5 joints for 3 minutes, 30 fpm running speed. Returns diminishing gradually. Slowed running speed to 20 fpm @ 3,734' and circulated down every 5 joints for 5 minutes with returns continuing to diminish. 21:00 - 21:30 0.50 CASE P INT1 Circulate 1-1/2 bottoms up by staging pump to 4 bpm, 250 psi. Started pumping without returns then had gradually increasing returns until bottoms up. Fulf returns were achieved with bottoms up. Circulated G-Seal to shakers throughout circulation until bottoms up. Circulated until shakers cleaned up. Well breathing back after pumps are shut down. 21:30 - 22:30 1.00 CASE P INT1 Continue RIH with 7" casing from 3,940' to 4,350' filling every joint and circulating down every 5 joints for 5 minutes. Good returns starting out then decreasing by the joint. 22:30 - 23:30 1.00 CASE P INT1 Circulate 2-1/2 bottoms up by strokes, staging pump to 4 bpm, 250 psi. Started pumping with low returns. Full returns not achieved until) 2 bottoms up by calculated strokes. Circulated G-Seal to shakers. Circulated until shakers cleaned up. Well breathing back after pumps are shut down. 23:30 - 00:00 0.50 CASE P INTi Start washing down each joint from 4,350. to 4,432'. 4 bpm, 290 psi. Lost net total of 20 bbls for the day. Total losses for well - 1,738 bbls. 'Keeping mud heated in pits with steam (100 deg) and adding barite as necessary to maintain 11.6 ppg. *Mud losses: 370 bbls for tour, 608 bbls for day, 628 bbls for casing run, 2,346 bbls for well. 6/16/2006 00:00 - 01:00 1.00 CASE P INT1 Continue running in hole with 7" 26# BTC-M casing, washing down each joint from 4,432. to 4,637'. 4 bpm, 290 psi, f 0 fpm running speed. Attempted to wash 10 joints down but washed 7 joints with diminishing returns. 01:00 - 02:30 1.50 CASE P INT1 Circulate staging pump to 4 bpm, 265 psi. Started pumping with low returns with returns gradually increasing to 80% after G-Seal out of hole and shakers cleaned up. Well breathing back after pumps are shut down. 02:30 - 03:30 1.00 CASE P INT1 Continue running in hole with 5 joints 7" casing, washing down each joint from 4,637. to 4,842'. 4 bpm, 270 psi, 10 fpm running speed. 03:30 - 04:00 0.50 CASE P INT1 Circulate staging pump to 4 bpm, 265 psi. Started pumping with low returns with returns gradually increasing to 80% after G-Seal out of hole and shakers cleaned up. Well breathing back after pumps are shut down. 04:00 - 05:00 1.00 CASE P INT1 Continue running in hole with 5 joints 7" casing, washing down each joint from 4,842, to 5,048. 4 bpm, 270 psi, 10 fpm running speed. 'Lost total of 119 bbls from midnight. 05:00 - 06:00 1.00 CASE P INT1 Circulate staging pump to 4 bpm, 295 psi. Started pumping with low returns with returns gradually increasing to 80% after G-Seal out of hole and shakers cleaned up. Well breathing back after pumps are shut down. 06:00 - 12:30 6.50 CASE P INT1 Continue running in hole with 7" casing from 5,048' to 5,960'. Filling every joint, circulating down every other joint and Printed: 715!2006 10:13:06 AM BP EXPLORATION Page 11 of 19 Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Spud Date: 6/1/2006 Event Name: DRILL+COMPLETE Start: 5/31/2006 End: 7/1!2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/1/2006 Rig Name: NABOBS 9ES Rig Number: Date ~'~ From - To ~', Hours ~ Task 'Code NPT Phase 6/16/2006 06:00 - 12:30 6.50 CASE P INT1 12:30 - 14:30 2.00 CASE P INT1 14:30 - 15:00 0.50 CASE P INT1 15:00 - 16:00 1.00 CASE P INT1 16:00 - 16:30 0.50 CASE P 1NT1 16:30 - 00:00 I 7.501 CASE I P I I INTi 6/17/2006 100:00 - 00:30 0.501 CASE P I ~ INT1 00:30 - 03:00 I 2.501 CASE I P I I INT1 03:00 - 04:30 1.501 CASE P INT1 04:30 - 04:45 I 0.251 CASE I P I I INT1 04:45 - 05:00 I 0.251 CASE I P I I INT1 Description of Operations circulating bottoms up every 6th joint @ 4 bpm, 305 psi. PU - 188k, SO - 144k Circulate staging pump to 4 bpm, 300 psi. Started pumping with low returns and with returns not increasing. Well breathing back after pumps are shut down. Continue running in hole with 7" casing from 5,960' to 6,165'. Circulating down every joint ~ 4 bpm, 305 psi. Circulate staging pump to 4 bpm, 330 psi. with minimal returns. PU - 204k, SO - 147k. Well breathing back after pumps are shut down. Continue running hole with remainder of 7" 26# BTC-M casing from 6,165' to 6,350'. Circulating down every joint C~3 4 bpm 350 psi with minimal returns and losing appx 2 bbls per joint. Well still breathing back after pumps are shut down. Change over to TCII equipment and run in hole with 7" 26# L-80 TCII casing from 6,350' to 9,100'. Circulating down every joint C~3 4 bpm 490 psi with minimal returns and with losses increasing to 4 bbls per joint. Well still breathing back after pumps are shut down. 'Mud losses: 370 bbls for tour, 608 bbls for day, 628 bbls for casing run, 2,346 bbls for well. Set down @ 9,100' while washing down casing. Packed off. Work pipe several times pumping ~ 1-1/2 bpm to clear up obstruction. Work down to 9,139' and picking up several times past pack off point until able to pump without packing off. Well quit breathing back when pumps are shut down. No further retums. Continue running in hole with 7" 26# BTC-M x TCII casing from 9,139' to 10,000 washing every joint ~ 1-1/2 bpm, 650 psi. No returns. Set down ~ 10,000'. Minor packing off. Work through tight hole from 10,000 to 10,141'. Wiping through tight spots until able to go through without packing off. Continue running in hole with 7" casing from 10,141' to 10,300' without problem. (No returns) Make up 20' space out pup, hanger and landing joint. Land casing on depth C~3 10,348.7'. Ran total of: 153 Jts 7" 26# L-80 BTC-M, 6,316' 99 Jts 7" 26# L-80 TCII, 3,950' 'Shoe @ 10,349' Tops: Float Collar @ 10,306' Baffle Collar ~ 10,264' ES Cementer C~ 7,116' BTC-M x TCII X-Over Jt C 3,998' 7 1/8" x 8 1/4" Rigid Straight Blade Centralizers: Jts. # 1 - 2 cent. locked down next to shoe. Jts. # 2 thru 61 - No centralization Jts. # 62 thru # 153 - 2 ea. Per joint separated by stop ring TCII Jts. # 1 thru # 12: Odd #'s - 2 ea. Per joint separated by stop ring Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Page 12 of 19 Operations Summary Report Legal Well Name: L -51 Common W ell Name: L -51 Spud Date: 6/1/2006 Event Nam e: DRILL+C OMPLE TE Start : 5/31/2006 End: 7/1/2006 Contractor Name: NABOBS ALASK A DRI LLING I Rig Release: 7/1/2006 Rig Name: NABOBS 9ES Rig Number: Date i From - To Hours ! Task Code ~ NPT ~ Phase ~ Description of Operations 6/17/2006 04:45 - 05:00 0.25 CASE P INT1 Even #'s - 1 ea full floating entire joint Total of 204 centralizers, 98 stop rings. '217 bbls lost from midnight for total of 845 bbls lost on casing run. 05:00 - 05:30 0.50 CEMT P INT1 Lay down casing fill up tool, rig up cementing head and cement lines. 05:30 - 07:00 1.50 CEMT P INT7 Attempt to regain circulation by staging up pump from 1/2 bpm to 5 bpm, 700 psi. Pumped away 100 bbls @ 5 bpm then slowed pump to 1-1/2 bpm while batch mixing cement. No returns while pumping. Held PJSM while pumping mud. Reciprocated pipe 2' past pickup weight throughout pumping. PU - 310k, SO - 165k. 07:00 - 10:00 3.00 CEMT P INT7 Switch to Dowell: Pump 5 bbls. Water. Test lines to 4000 psi. Pump 5 bbls of mudpush and kick out bottom bypass plug. Loaded the top closing plug in the head. Pumped remaining 35 bbls Dowell MudPush II viscosified spacer weighted to 11.0 ppg. Pump 94 bbls Dowell lead cement ~ 12.0 ppg. followed by 23 bbls of Dowell Premium G Cement ~ 15.8 ppg. Kick out closing plug with 5 bbls of water from Dowell. Switch to rig and displace cement with 388 bbls of 10.4 ppg mud. Pumped first 275 bbls at 5 bpm, 440 psi ICP, 575 FCP. Reduced the rate to 3 bpm while lead cement going around shoe, 515 psi ICP, 865 psi, FCP. Reduced the rate to 1 bpm when tail cement going around shoe, 770 psi ICP, 780 psi FCP. Bumped plug to 1250 psi ~ calculated displacement of 95.2%. Bleed pressure and check for flow back - OK. CIP ~ 09:50 hr. Reciprocated pipe throughout cement job until 298 bbls were away on the displacement, then set casing on head. 10:00 - 12:00 2.00 CEMT P INTi Load 2nd stage closing plug. Pressured up to 3,657 psi to shear and open ES Cementer. Attempt to circulate C~1 2 bpm, 500 psi. No returns. Pump 1 annulus volume (120 bbls) at same rate without returns. 12:00 - 16:00 4.00 CEMT P INT1 Wait on cement compressive strength of 100 Bc. Prep pits for 2nd stage displacement. 16:00 - 20:00 4.00 CEMT P INT1 Switch to Dowell: Pump 5 bbls water, test lines to 4,000 psi, pump 25 bbls CW 100 followed with 40 bbls MudPush II spacer weighted to 11 ppg. Batch mix & pump 99 bbls Dowell lead cement ~ 12.5 ppg. Followed by 27 bbls 15.8 ppg Class G cement Drop 2nd. Stage Closing Plug. Kick out plug with 5 bbls. of water. Switch to rig and displace cement with 268 bbls of 10.4 ppg mud. Pumped the first 60 bbls at 4.8 bpm, 255 psi. Reduced the rate to 3 bpm for the next 93 bbls, 120 psi ICP, 430 FCP. Reduced the rate to 1.5 bpm for remaining 100 bbls until the plug bumped, 360 psi ICP, 645 psi FCP. Bumped plug and continue pressuring up to 2,400 psi. Cementer closed @ 1,900 psi. Bleed pressure and check for flow back - OK. CIP ~ 19:25 hr. 20:00 - 21:00 1.00 CEMT P INT1 Rig down cement head and landing joint. Rig down casing tools. Change out bails. 21:00 - 22:30 1.50 DHB P INT1 Install 9 5/8' x 7" pack-off. Test same to 5,000 psi - 15 minutes - OK. Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Page 13 of 19 Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Spud Date: 6/1/2006 Event Name: DRILL+COMPLETE Start: 5/31/2006 End: 7/1/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/1/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To ;Hours Task I Code NPT Phase Description of Operations I- - --1- - - - _ ----__ 6/17/2006 22:30 - 23:00 0.50 EVAL P INT1 Perform LOT and infectivity test on the 7" annulus. TVD - 2,694', MW - 11.6 ppg, Surf Pressure - 150 psi, EMW - 12.67 ppg. Injected 5 bbls C~3 3 bpm, 340 psi. 23:00 - 00:00 1.00 BOPSU P INT1 Change out top pipe rams from 7" to 3.5" x 6" VBR's. 6/18/2006 100:00 - 02:30 I 2.501 BOPSUR P I I INT1 02:30 - 04:30 2.00 BOPSU N SFAL INT1 04:30 - 06:00 1.50 BOPSU P INT1 06:00 - 07:00 I 1.001 BOPSUR P 07:00 - 08:30 I 1.501 CLEAN I P 08:30 - 12:00 ~ 3.501 CLEAN P 12:00 - 14:30 ~ 2.50 ~ CLEAN ~ P 14:30 - 15:00 I 0.501 CLEAN I P 15:00 - 16:00 1.00 CLEAN P 16:00 - 16:30 0.50 CLEAN P 16:30 - 17:00 0.50 CLEAN P 17:00 - 19:30 2.50 CLEAN P 19:30 - 21:00 I 1.501 CLEAN I P 21:00 - 22:00 1 1.001 CLEAN I P 22:00 - 00:00 I 2.001 CLEAN I P 6/19/2006 00:00 - 03:00 3.00 CLEAN P 03:00 - 03:30 0.50 CLEAN P 03:30 - 04:00 0.501 CLEAN P 04:00 - 05:00 1.00 DRILL P INT1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 *Lost total of 1,285 bbls for the day, 1,913 bbls for casing and cement job, 3,651 bbls total for well. Test BOPE to 250 psi low pressure, 3,500 psi high pressure. Perform accumulator test. Witnessing of test waived by AOGCC rep John Spaulding. Test witnessed by BP WSL Robert French and NAD TP Brian Tiedemann. Wash pipe on topdrive failed during upper kelly cock valve test. Replace wash pipe and packing. Complete remainder of BOPE test. VBR's were tested with 4" and 3.5" test joints. Rig down test equipment, pull test plug, install wear bushing. Blow down surface lines. Pick up and make up dumb iron cleanout assembly. (BHA #6) 6-1/8" ATJ-4, NB STAB, 3 ea NM Flex DC's, 9 ea jts 4" DP, JAR. Run in hole picking up 4" drill pipe out of pipe shed from 417' to 2,889'. Injected. 85 bbls 10.4 ppg ~ 3 bpm, 350 psi ICP, 550 psi, FCP out of critical path. Continue running in hole with pipe out of derrick from 2,889' to top of cement C~ 7,085'. Drill cement from 7,085' to top of cementer @ 7,116'. Drill out cementer from 7,116' to 7,118'. 247 gpm, 840 psi, 60 rpm, 5k TO, 15k WOB. Pass through cementer several times to confirm clean drill out. Run in hole from 7,118' to top of cement ~ 10,128'. Circulate air out of pipe for casing test. Pressure test 7" casing to 3,500 psi - 30 min- 0 psi loss. Drill cement from 10,128' to Baffle collar fps 10,258' (6 ft high) Float collar @ 10,301'. Drill out shoe track to 10,334', 7 ft above shoe by DPM. 249 gpm, 965 psi, 60 rpm, 10.8k TO, WOB - 15k, PU - 220k, SO - 135k, ROT - 165k Displace well from 10.4 ppg LSND mud to 9.6 ppg FLO-PRO mud. Pump 50 bbl water spacer and 50 bbls STEEL LUBE EP pill followed by 9.6 ppg FLO-PRO mud.328 gpm, 1,710 psi, 60 rpm, 10.6k TO, PU - 220k, SO - 135k, ROT - 165k. After new mud in hole parameters changed to: 60 rpm, 4.5k TO - PU - 185k, SO - 148k, ROT - 160k. Clean possum belly and mud troughs in preparation for trip out of hole. POH, steal line measurement, from 10,334 to 7.969'. *Freeze protected 7" annulus with 70 bbls dead crude @ 3 bpm, 500 psi ICP, 1,000 psi FCP, 900 psi SIP. Out of critical path. Continue POH with BHA #6 from 7,969' to 417'. Laydown BHA #6. Break out bit and NB STAB, stand back Jar and Flex DC's Service topdrive, crown, and blocks. PJSM. Pick up and make up directional build assembly (BHA Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Page 1a of 19 Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Spud Date: 6/1/2006 Event Name: DRILL+COMPLETE Start: 5/31/2006 End: 7/1/2006 Contractor Name: NABOBS ALASKA DR ILLING I Rig Release: 7/1/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT ~ Phase ~ Description of Operations 6/19/2006 04:00 - 05:00 1.00 DRILL P __ _ __ PROD1 #7) MX-09DX bit, 2 deg PDM, Slimpulse MWD, Sea Flex DC's, Circ Sub, Sea 4" DP, Jar. 05:00 - 06:00 1.00 DRILL P PROD1 Run in hole with BHA #7 fro 467' to 1,137'. Shallow hole test MWD - OK. 06:00 - 09:30 3.50 DRILL P PROD1 Continue running in hole from 1,137' to 10,200'. PU - 200k, SO - 163k. 09:30 - 11:00 1.50 DRILL P PROD1 MadPass log from 10,200' to 10,334' for gamma ray tie in. 200 gpm, 1,445 psi. 150 fpm 11:00 - 12:00 1.00 DRILL P PROD1 Drill cement from 10,334' to shoe on depth ~ 10,347'. Drill out shoe. 250 gpm 1,980 psi, no rotation, WOB - 5-7k. 12:00 - 12:30 0.50 DRILL P PROD1 Drill 6-1/8" hole directionally from 10,350' to 10,385. 250 gpm, 1,980 psi. AST - 0.5 hr 12:30 - 13:30 1.00 DRILL P PRODi Circulate bottoms up for FIT. 274 gpm, 2,150 psi. Perform FIT 13:30 - 18:00 I 4.501 DRILL I P I I PROD1 18:00 - 18:30 I 0.501 DRILL I P I I PROD1 18:30 - 19:00 0.50 DRILL P PROD1 19:00 - 19:30 0.50 DRILL P PROD1 19:30 - 20:30 1.00 DRILL P PROD1 20:30 - 00:00 3.50 DRILL P PROD1 6/20/2006 00:00 - 01:00 1.00 DRILL P PROD1 01:00 - 01:30 0.50 DRILL P PROD1 01:30 - 04:00 2.50 DRILL P PROD1 04:00 - 04:30 0.50 DRILL P PROD1 04:30 - 08:00 3.50 DRILL P PROD1 08:00 - 09:00 1.00 DRILL P PROD1 09:00 - 13:00 4.00 DRILL P PROD1 13:00 - 13:30 0.50 DRILL P PROD1 13:30 - 00:00 10.50 DRILL P PROD1 6/21/2006 100:00 - 00:30 I 0.501 DRILL I P I (PROD1 00:30 - 02:00 I 1.501 DRILL i N I DFAL I PROD1 02:00 - 03:15 I 1.251 DRILL I N I DFAL I PROD1 to EMW of 11.5 ppg. MD - 10,348', TVD - 8,722', Test Pressure - 870 psi, MW - 9.6 ppg. Drill 6-1/8" hole directionally from 10,385' to 10,576 to land horizontal. 279 gpm, 2,470 psi. on, 2,270 psi off, 30 rpm, 5k TO on, 3.9k TO off. PU - 190k, SO - 160k, RT - 175k, W OB - 20k. AST - 0.81 hrs, ART - 1.76 hrs. Circulate bottoms up. 279 gpm 2,205 psi, 30 rpm, 4.1k TO. 9.6 ppg mud weight. Monitor well - OK. POH from 10,576' to 10, 285'. Shear out Circ sub with 2,000 psi. Pump dry job. PU - 190k, SO - 160k. Cut and slip drilling line 76'. Inspect brake linkage. POH from 10,285' to 2,484'. Continue POH with BHA #7 from 2,484 to 467' Laydown BHA #7. PU and MU BHA#8 - 4-3/4" Rotary Steerable w/Periscope. Pump through and test same - OK. BHA#8: 6-1/8" Hycalog RSX513M w/4 x 10's, 4-3/4" PowerDrive Bias Unit, 4-3/4" PowerDrive, nm flex sub, receiver sub, Periscope, Impulse MWD, ADN, 2 x nm flex dc, Circ sub, xo, 1 x 4" DP, jars. RIH with BHA #8 from 233' to 998' on 4" DP. Shallow hole test MWD - OK. Continue running in hole from 998' to 10,246'. Obtain torque and drag parameters. Without pumps: PU - 188k, SO - 160k. With Pumps: PU - 184k, SO - 153k, ROT - 166k. RPMlTO(ftlbs): 30/3250, 60/3500, 100/3500, 140/3750. RIH from 10,246' to 10,576'. MAD Pass from 10,576' to 10,320 @ 80 -100 fph, 250 gpm, 1,815 psi. RIH from 10,320' to 10,576'. Drill 6-1/8" hole directionally from 10,576 to 11,107'. 283 gpm, 2,340 psi. on, 2,220 psi off, 130 rpm, 7.3k TO on, 5.1 k TO off. PU - 185k, SO - 150k, RT - 165k, WOB - 10k. ART - 4.53 hrs. Drill 6-1/8" hole directionally from 11,107' to 11,206'. 283 gpm, 2,340 psi. on, 2,220 psi off, 130 rpm, 7.3k TO on, 5.1 k TO off. PU - 185k, SO - 150k, RT - 165k, WOB - 10k. Trouble getting azmuthal data from the MWD. Troubleshoot the tool from surface while circulating -unsuccessful - 290 gpm, 2,645 psi, 130 rpm. MW in - 9.6 ppg, MW out - 9.6 ppg. POH standing back 4" DP from 11,206' to 10,341'. Drop ball Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Page 15 of 19 Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Spud Date: 6/1/2006 Event Name: DRILL+COMPL ETE Start: 5/31/2006 End: 7/1/2006 Contractor Name: NABOBS ALAS KA DRI LLING I Rig Release: 7/1/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To ~ Hours Task Code NPT Phase Description of Operations 6/21/2006 02:00 - 03:15 1.25 DRILL N DFAL PROD1 and open circ sub. Monitor the well -stable. Pump dry job. 03:15 - 07:00 3.75 DRILL N DFAL PROD? POH standing back 4" DP and 4" HWDP from 10,341' to 233'. 07:00 - 09:00 2.00 DRILL N DFAL PROD1 Stand back the jar stand and the drill collars. PJSM for 09:00 - 11:00 2.00 DRILL N DFAL PROD1 11:00 - 12:00 1.00 DRILL N DFAL PRODi 12:00 - 14:30 2.50 DRILL N DFAL PROD1 14:30 - 16:00 1.50 DRILL P PROD1 16:00 - 17:30 1.50 DRILL N DFAL PROD1 17:30 - 00:00 6.50 DRILL P PROD1 6/22/2006 00:00 - 09:00 9.00 DRILL P PROD1 09:00 - 12:00 3.00 DRILL N RREP PROD1 12:00 - 19:00 7.00 DRILL N RREP PROD1 19:00 - 20:00 1.00 DRILL N RREP PROD1 20:00 - 00:00 4.00 DRILL N RREP PROD1 6/23/2006 00:00 - 09:30 9.50 DRILL N RREP PROD1 09:30 - 10:00 0.50 DRILL N RREP PROD1 handling nuclear source. LD nuclear source and ADN. LD MWD, Periscope, nm flex sub, Receiver sub, PowerDrive, Power Drive Bias Unit. Break out and check the 6-1/8" Hycalog RSX513M -graded 0-0-NO-A-X-I-NO-DTF PJSM to MU BHA and handle nuclear source. PU and MU BHA#9 - 4-3/4" Rotary Steerable w/Periscope. Pump through and test same - OK. BHA#9: 6-1/8" Hycalog RSX513M-RR w/4 x 10's, 4-3/4" PowerDrive Bias Unit, 4-3/4" PowerDrive, nm flex sub, receiver sub, Periscope, Impulse MWD, ADN, 2 x nm flex dc, circ sub, xo, 1 x 4" DP, jars. Changed out the MWD and the PowerDrive components from BHA#8 to BHA#9. RIH with BHA#9 on 4" DP to 1,094'. Shallow test the MWD - good. RIH with BHA#9 on 4" DP and 4" HWDP to 10,341'. Service the top drive. Cut and slip 84' of drilling line. Inspect the brakes. RIH with BHA#9 on 4" DP and 4" HWDP from 10,341' to 10,628'. RIH from 10,628' to 11,206 resurveying every 45'. Drill 6-1/8" hole directionally from 11,206' to 11,628' - 289 gpm, 2,600 psi. on, 2,470 psi off, 130 rpm, 7.7k TO on, 4.2k TO off. PU - 185k, SO - 143k, RT - 165k, WOB - 10k. ART - 3.42 hrs. Pumped a weighted sweep around at 11,390' - 20 bbls at 1.5 ppg over mudweight -saw -30% additional cuttings returned to surface. Drill 6-1/8" hole directionally from i 1,628' to 12,228' - 289 gpm, 2,825 psi. on, 2,760 psi off, 130 rpm, 7.7k TO on, 5.2k TO off. PU - 178k, SO - 137k, RT - 160k, WOB - 10k, ART - 2.45 While going to retrieve another stand to continue drilling, the rig tong line got caught on the top drive electrical service loop. The top drive picked up the tongs causing the snub line to tighten before it could be stopped. At that point, 2 pins that secure the electrical loop to the top drive broke allowing them and one side of the pad eye to fall to the floor, -85'. The area was secured and an investigation undertaken. The top drive was inspected to ensure safe to move. Lowered the top drive -10', picked up the rig tongs with the air tugger and freed the cable caught around the service loop yoke. Lowered the top drive to the rig floor and the electrician inspected the service loop. Secured the service loop with 2 new bolts and re-verified safe travel through the derrick. Stood back 1 stand and positioned the top drive at the rig floor for repairs. Attempt repair of the electrical service loop on the top drive. Test out the system -repair failed. Decide to changeout the service loop. POH standing back 4" DP from 12,135' to 10,341' -inside the 7" casing shoe at 10,348'. PJSM. changeout the electrical service loop on the top drive. Continue to changeout the electrical service loop on the top drive. RIH from 10,341' to 12,228'. Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Page 16 of 19 Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Start: 5/31 /2006 Rig Release: 7/1/2006 Rig Number: Spud Date: 6/1/2006 End: 7/1 /2006 Date From - To Hours Task !Code'! NPT 6/23/2006 10:00 - 11:30 1.501 DRILL ~ P Description of Operations Phase Drill 6-1/8" ahead directionally from 12,228' to 12,245', PU - 185K, SO - 135K, ROT - 175K, 280 gpm, 2,835 psi on, 2,750 psi off, 5.7k TO on, 4.8k TO off, ART - 0.16. Downhole Periscope tool failure. MW in - 9.6 ppg, MW out - 9.6 ppg. Monitor well -stable. POH from 12,245' to 10,341' Drop dart and open the circ sub. Monitor the well -stable. Pump dry job and POH to the top of the jar stand of BHA#9 at 264'. PJSM for LD BHA #9 and nuclear source. Stand back the jar stand. LD the nuclear source and stand back the ADN and the flex collars. LD the MW D and the Periscope tool. Break out the bit and LD the PowerDrive components. 6-1/8" RSX513M-RR graded: 0-0-NO-A-X-I-NO-DTF Clear the clean the floor. Hold PJSM for picking up BHA #10 and handling nuclear source. MU BHA #10 and RIH on 4" DP to 1,185'. Shallow test the MWD -good. BHA #10: 6-1/8" Hycalog DSX613M-B4 w/3 x 10's & 1 x 9, 4-3/4" AIM motor w/ 1.5 deg - 7/8 R/S - 2 stg, bypass sub w/float, nm stab, nm flew dc, Impulse MWD, ADN, 2 x nm flex dc, circ sub, xo, 1 x 4" DP, jars. RIH with BHA #10 on 4" DP from 1,185' to 7,018' -filling pipe every 3,000'. RIH with BHA #10 on 4" DP from 7,018' to 10333' -filling pipe every 3,000' Service the top drive, lubricate the rig and the crown, check the brakes. SIMOPS: Changeout the line for the rig tongs that was damaged in the accident with the top drive. RIH from 10,333' to 12,130'. Wash, ream and log to bottom at 100 fph from 12,130' to 12,245' - 280 gpm, 55 rpm, 2,750 psi, 5k TO. Drill 6-1/8" hole ahead directionally from 12,245' to 12,504', PU - 195K, SO - 145K, ROT - 167K, 290 gpm, 2,840 psi on, 2,620 psi off, 60 rpm, 6.8k TO on, 5k TO off, ART - 0.8, AST - 3.4. Drill 6-1/8" hole ahead directionally from 12,504' to 13,250', PU - 186K, SO - 135K, ROT - 158K, 290 gpm, 2,910 psi on, 2,665 psi off, 110 rpm, 8.2k TO on, 6.1 k TO off, ART - 4.78, AST - 4.0. Pumped a 1.5 ppg over mud weight sweep of 13 bbls at 12,733' - no appreciable difference in cuttings returned to surface. Drill 6-1/8" hole ahead directionally from 13,250' to 14,027', PU - 192K, SO - 140K, ROT - 168K, 290 gpm, 3,100 psi on, 2,980 psi off, 110 rpm, 7.2k TO on, 5k TO off, AST - 3.2, ART - 5.47. Drill 6-1/8" hole ahead directionally from 14,027' to 14,935', PU - 184K, SO - 132K, ROT - 154K, 290 gpm, 3,250 psi on, 3,100 psi off, 110 rpm, 7.3k TO on, 6k TO off, AST - 2.03, ART - 5.96. Lost 50 bbls of 9.6 ppg FloPro at -10 bph. Drill 6-1/8" hole ahead directionally from 14,935' to 15,683' (TD), PU - 195K, SO - 135K, ROT - 165K, 290 gpm, 3,250 psi off, 3,380 psi on, 110 rpm, 7.8k TO on, 5.3k TO off, ART - 5.3, AST - 0.8, MW in - 9.6 ppg, MW out - 9.6 ppg. Circulate a 1.5 ppg over MW weighted sweep across the open hole - 290 gpm, 3,250 psi. MAD pass from 15,683' to 14,560' <600'/hr -ROT - 162, 110 rpm, 5.6k TO, 280 gpm, 2,930 psi. Saw no difference in the PROD1 11:30 - 17:30 I 6.001 DRILL I N I DFAL I PROD1 17:30 - 19:00 I 1.501 DRILL I N I DFAL I PROD1 19:00 - 19:30 I 0.501 DRILL I N I DFAL I PRODi 19:30 - 21:00 I 1.501 DRILL I N I DFAL I PROD1 21:00 - 00:00 3.00 DRILL N DFAL PRODi 6/24/2006 00:00 - 01:30 1.50 DRILL N DFAL PROD1 01:30 - 02:30 I 1.001 DRILL I P I I PROD1 02:30 - 03:30 1.00 DRILL N DFAL PRODi 03:30 - 05:00 1.50 DRILL N DFAL PROD1 05:00 - 12:00 I 7.00) DRILL I P I I PROD1 12:00 - 00:00 12.001 DRILL P I I PROD1 6/25/2006 100:00 - 12:00 12.00 DRILL P PROD1 12:00 - 00:00 I 12.001 DRILL I P I I PRODi 6/26/2006 100:00 - 07:30 I 7.501 DRILL I P I I PROD1 07:30 - 08:00 0.501 DRILL P PROD1 08:00 - 12:00 I 4.001 DRILL I P I I PROD1 Printed: 7/5/2006 10:13:06 AM BP EXPLORATION Page 17 of 19 Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Spud Date: 6/1/2006 Event Name: DRILL+COMPLETE Start: 5/31/2006 End: 7/1/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/1/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task ~ Code ~ NPT Phase Description of Operations 6/26/2006 08:00 - 12:00 4.00 DRILL P PROD1 cuttings volume returned to the surface when the sweep came back. 12:00 - 19:30 19:30 - 20:30 20:30 - 22:30 22:30 - 00:00 6/27/2006 00:00 - 04:00 04:00 - 06:00 Lost 22 bbls of 9.6 ppg F1oPro from 0000 to 1200. 7.50 DRILL P PROD1 Continue MAD pass from 14,560' to 12,223' <600'/hr -ROT - 162, 110 rpm, 5.4k TO, 290 gpm, 2,660 psi. 1.00 DRILL P PROD1 POH standing back 4" DP from 12,223' to 10,337' without pumping and without problems - PU - 196k, SO - 152k. 2.00 DRILL P PROD1 Monitor well at the shoe -stable. Drop ball and open the circ sub. Circulate a bottoms up at 320 gpm, 1,510 psi. Pump a dry job and spot in drill pipe. 1.50 DRILL P PROD1 Cut and slip 75' of drilling line. Inspect the drum area. Service the top drive and the crown. 4.00 DRILL P 2.00 DRILL P 06:00 - 06:30 0.50 DRILL P 06:30 - 07:30 1.00 CASE P 07:30 - 14:00 6.50 CASE P 14:00 - 00:00 10.00 CASE P 6/28/2006 100:00 - 00:30 I 0.501 CASE I P 00:30 - 01:00 I 0.501 CASE I P 01:00 - 02:30 1.50 CASE P 02:30 - 04:00 1.50 CASE P 04:00 - 05:30 1.50 CASE P 05:30 - 06:30 1.00 CASE P 06:30 - 07:00 0.50 CASE P 07:00 - 11:30 4.50 CASE P 11:30 - 12:00 0.50 CASE P Lost 20 bbls of 9.6 ppg FloPro from 1200 to 0000, for a total of 42 bbls lost for the day. PROD1 POH standing back 4" DP and HWDP from 10,337' to the top of the BHA at 264'. PROD1 PJSM to LD BHA and handle nuclear source. LD BHA #10. Hycalog 6-1/8" DSX613M-64 graded 0-0-NO-A-X-I-NO-TD PROD1 Clean and clear the floor RUNPRD RU to run 3-1/2" 9.2# L-80 IBT-m slotted/solid liner. RUNPRD PJSM. PU and RIH with the float shoe on a 3-1/2" solid joint. PU and RIH with 47 joints of slotted, TAM Swell Packer assy, 36 joints of slotted, TAM Swell Packer assy, 93 joints of slotted, 6 joints of solid, 3-1/2" pup, 4.5" x 3.5" XO, 5" x 4.5" XO, 7" x 5" HMC Liner hanger, 7" x 5" ZXP liner top packer w/11.29' tieback, Baker C2 running tool and handling xo pup to 5,521'. All connections torqued to the mark with 2,500 ftlbs and utilized BOL2000NM thread lubricant. RUNPRD RIH with 3-1/2" liner on 4" DP and HWDP to 15,683' without problems. PU - 205k, SO - 153k. PU to up weight and spot liner on depth at midnight. Lost 38 bbls 9.6 ppg FloPro while picking up liner. RUNPRD Pump 10 bbls of fluid to ensure pipe is full. Drop 29/32" ball and pump on seat. RUNPRD Increase pressure to 2,400 psi to set the hanger. Slack off to 110k. Increase pressure to 3,500 psi to set the ZXP packer - hold for 1 minute. Increase pressure to 4,200 psi and observe the ball-seat shear and pressure drop off. PU to 150k. Line up and pressure test the liner top to 1,000 psi for 5 minutes -good test. Bleed off pressure. Slack off to 110k and rotate 15 turns to the right to release the running tool, PU - 185k. PU 10' to expose the dogs. Slack off to 135k with rotation on top of the ZXP packer for good measure. RUNPRD Displace the well over to 9.6 ppg brine - 270 gpm, 1,000 psi. RUNPRD Clean the possum bellies, drip pans, rig floor and trip tank. RUNPRD MWin - 9.6 ppg, MWout - 9.6 ppg. POH standing back 28 stands of 4" DP. RUNPRD LD 24 joints of 4" HWDP. RUNPRD POH with 22 stands of 4" DP -leaving 10,219' in the derrick. RUNPRD LD 150 joints of 4" DP. RUNPRD Make service breaks on the liner running tools and LD same. Printed: 7/5/2006 70:13:06 AM BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date I From - To L-51 L-51 DRILL+COMPLETE NABOBS ALASKA DRILLING I NABORS9ES Hours i Task II, Code' NPT Start: 5/31 /2006 Rig Release: 7/1/2006 Rig Number: Phase r - --- --- 6l28/2006 112:00 - 12:30 0.50 ~ CASE ~ P ~ RUNPRD 12:30 - 00:00 I 11.501 EVAL I P I I OTHCMP 6/29/2006 00:00 - 00:30 0.50 EVAL P OTHCMP 00:30 - 02:00 1.50 CASE P RUNPRD 02:00 - 06:00 4.00 CASE P RUNPRD 06:00 - 07:00 1.00 CASE P RUNPRD 07:00 - 10:00 3.00 CASE P RUNPRD 10:00 - 11:30 1.50 CASE P RUNPRD 11:30 - 12:30 1.00 CASE P RUNPRD 12:30 - 17:00 4.50 CASE P RUNPRD 17:00 - 19:30 2.50 CEMT P I NT1 19:30 - 20:30 1.00 CEMT P INT1 20:30 - 00:00 3.50 BUNCO RUNCMP 6/30/2006 00:00 - 19:30 I 19.50 19:30 - 22:00 I 2.50 RUNCMP RUNCMP Page 18 of 19 Spud Date: 6/1 /2006 End: 7/1 /2006 Description of Operations Meeting with DUS, NAD, and BP on camp conditions and concerns. PJSM with SLB and rig team. PU and RU the wireling tools and logging equipment. RIH with USIT and log from 10,100' to surface. RIH to 5,100' and run a correlation log. POH and LD wireline tools. RD SLB. Total losses for the day - 13 bbls of 9.6 ppg NaCI brine. Continue to RD SLB E-line. MU mule shoe and RIH with 49 stands of 4" DP. LD 147 joints of 4" DP. Service and lubricate the top drive and rig components. MU mule shoe and RIH with 59 stands of 4" DP. LD 42 joints of 4" DP. Cut and slip 72' of drilling line. LD 135 joints of 4" DP. Clear the rig floor. RU Dowell and LRHOS to perform a downsqueeze of the 9-5/8" x 7" annulus. Perform LOT with 9.6 ppg brine - wellbore full of dead crude, ICP - 280 psi, LOT - 550 psi. Slowly bring the injection rate up to 5 bpm, 950 psi. Pumped a total of 128 bbls of 120 degF 9.6 ppg brine, FCP - 600 psi. Hold PJSM with Dowell and LRHOS. Pump 5 bbls of fresh water ahead and test lines to 4,000 psi. Batch up and pump 30 bbls of 15.8 ppg Class G cement + adds at 4.5 bpm, ICP - 600 psi, FCP - 500 psi. Shut in Dowell and line up to LRHOS. Displace the cement with 78 bbls of dead crude at 4 bpm, ICP - 300 psi, FCP - 1,000 psi. CIP at 1930. Change out the stabbing guide on the top drive. SIMOPS: Blow down Dowell and LRHOS lines and RD circulating lines in the cellar. RD Dowell and LRHOS. Pull the wear ring and make a dummy run with the hanger - mark the landing joint. Hang the I-wire sheave in the derrick and spot the I-wire spooler. RU the 3-1/2" completion running tools. PU and RIH with 311 joints of 3-1/2" 9.2# L-80 IBT-m completion string and tag up on the bottom of the tieback sleeve on depth at 10,184'. All connections below the Premier Packer have been Bakerloc'd. All other connections utilized BOL2000NM thread lubricant and were torqued to the mark with 2,500 ftlbs. Spaceout the 3-1/2" completion, terminate and test the I wire, land the tubing on the hanger. Run in the lock down screws and torque to 450 ftlbs. PU - 118k, SO - 100k. 3.5" HES 'X' Nipple: 2.813" ID - 2130' GLM #8 - 3.5" X 1" KBG-2 w/Dummy &INT Latch - 2183' GLM #7 - 3.5" X 1" KBG-2 w/DCK-3 Shear &INT Latch - 3630' GLM #6 - 3.5" X 1" KBG-2 w/Dummy &INT Latch - 4735' GLM #5 - 3.5" X 1" KBG-2 w/Dummy &INT Latch - 5743' GLM #4 - 3.5" X 1" KBG-2 w/Dummy &INT Latch - 6746' GLM #3 - 3.5" X 1" KBG-2 w/Dummy &INT Latch - 7774' GLM #2 - 3.5" X 1" KBG-2 w/Dummy &INT Latch - 8769' GLM #1 - 3.5" X 1" KBG-2 w/Dummy &INT Latch - 10009' Printed: 7/5/2006 10:13:06 AM C BP EXPLORATION Page 19 of 19 Operations Summary Report Legal Well Name: L-51 Common Well Name: L-51 Spud Date: 6/1/2006 Event Name: DRILL+COMPLETE Start: 5/31/2006 End: 7/1/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/1/2006 Rig Name: NABOBS 9ES Rig Number: Date ;From - To Hours Task Code' NPT Phase Description of Operations 6/30/2006 19:30 - 22:00 2.50 BUNCO RUNCMP 3.5" HES Symphony Plus Gauge Carrier - 10035' 3.5" HES 'X' Nipple: 2.813" ID - 10086' 7" X 3.5" Baker 'Premier' Hyd. Set Packer - 10107' 3.5" HES 'X' Nipple: 2.813" ID w/RHC-M plug - 10133' 3.5" HES 'X' Nipple: 2.813" ID - 10154' 4.5" WLEG: 3.958" ID - 10178' Ran 321 'over the collar' and 17 'mid joint' cannon clamp 22:00 - 00:00 2.00 BUNCO RUNCMP RU circulation lines and reverse circulate 357 bbls of clean 9.6 ppg brine, followed by 171 bbls corrosion inhibited 9.6 ppg brine, followed by 96 bbls of clean 9.6 ppg brine to place the corrosion inhibited fluid between the packer at 10,107' and GLM #7 with the DCK-3 shear valve located at 3,360' - 3 bpm, 450 psi. Lost a total of 19 bbls of 9.6 ppg brine over the last 24 hours. 7/1/2006 00:00 - 01:30 1.50 BUNCO RUNCMP Continue to reverse circulate 357 bbls of clean 9.6 ppg brine, followed by 171 bbls corrosion inhibited 9.6 ppg brine, followed by 96 bbls of clean 9.6 ppg brine to place the corrosion inhibited fluid between the packer at 10,107' and GLM #7 with the DCK-3 shear valve located at 3,360' - 3 bpm, 450 psi. 01:30 - 02:00 0.50 BUNCO RUNCMP Drop ball and rod and allow to fall into RHC-m plug at 10,333'. LD the landing joint and RU to set the packer and pressure test the tubing. 02:00 - 04:00 2.00 BUNCO RUNCMP Pressure up on the tubing to 4,100 psi to set the Premier Packer. Chart and hold pressure for 30 minutes -good. Bleed off tubing pressure to 2,500 psi. Pressure up on the annulus to 3,500 psi -chart and hold for 30 minutes -good. Bleed of the annulus and then the tubing pressures to zero. Pressure up on the annulus to 2,000 psi for DCK-3 shear. Pump across the shear valve in both directions -good returns. 04:00 - 04:30 0.50 BUNCO P RUNCMP Install TWC and test from below to 1,000 psi. Blow down the surface lines. 04:30 - 06:30 2.00 BOPSU P RUNCMP ND the BOPE. Pull riser and mouse hole. 06:30 - 07:00 0.50 WHSUR P RUNCMP Bring the tree and adapter flange into the cellar. 07:00 - 09:00 2.00 WHSUR P RUNCMP NU adapter flange. Install control line. Attempt to NU tree - controt line installed 180 degrees out. 09:00 - 10:30 1.50 WHSUR N HMAN RUNCMP Wait on Halliburton to return to location. 10:30 - 12:00 1.50 W HSUR N HMAN RUNCMP ND the adapter flange. 12:00 - 14:30 2.50 W HSUR N HMAN RUNCMP NU the adapter flange and tree -terminate the I-wire. Test adapter and tree to 5,000 psi -good. 14:30 - 15:30 1.00 WHSUR P RUNCMP Pull TWC with DSM lubricator. 15:30 - 18:00 2.50 W HSUR P RUNCMP RU circulation lines. Hold PJSM with LRHOS. Test lines to 3,500 psi -good. Pump 88 bbls of diesel down the annulus, taking returns up the tubing. Shut in and allow fluid to U-tube. Pump 6 bbls down the 9-5/8" x 7" annulus to verify open, ICP - 400 psi, FCP - 1,050 psi -annulus appears to be open. 18:00 - 20:00 2.00 WHSUR P RUNCMP Install BPV with DSM lubricator and test from below to 1,000 psi. Install VR plugs and secure the cellar.OA - 800 psi, IA - 100 psi, Tubing - 0 psi. Release the rig to L-217i at 2000 hours. Printed: 7/5/2006 10:13:06 AM i i ~.,. L-51 S u Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure /Slot: L-PAD / L-51 Well: L-51 Borehole: L-51 UWVAPI#: 500292330900 Survey Name /Date: L-51 /June 26, 2006 Tort /AHD / DDI / ERD ratio: 327.786° / 9925.82 ft / 6.757 / 1.111 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LaULong: N 70.35004019, W 149.32567166 location Grid NIE Y/X: N 5978062.750 ftUS, E 583057.660 ftUS Grid Convergence Angle: +0.63506187° Report Schlamherger Vertical Section Azimuth: 349.750° Vertical Section Origin: N 0.000 ft, E 0.000 ft ND Reference Datum: Rotary Table ND Reference Elevation: 76.3 ft relative to MSL Sea Bed /Ground Level Elevation: 47.90 ft relative to MSL Magnetic Declination: 24.209° Total Field Strength: 57579.172 nT Magnetic Dip: 80.856° Declination Date: June 04, 2006 . Magnetic Declination Model: BGGM 2006 North Reference: True North Total Corr Mag North -> True North: +24.209° Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de ft tt tt ft tt tt ft de 00 ft ttUS ttUS Hlt U.UU U.UO 0.00 -76.30 U.UU U.UU U.UV U.UU U.UU U.UU U.UU b`J/iSU6Z. /5 b63Ub/.ti6 N /U.3bUU4Uly W 14y. 3Lb6/lt)O GYD GC SS 77.00 0.23 50.44 0.70 77.00 0.08 0.15 0.15 0.10 0.12 0.30 5978062. 85 583057.78 N 70.35004046 W 149. 32567070 170.00 0.25 77.71 93.70 170.00 0.17 0.54 0.53 0.26 0.46 0.12 5978063. 02 583058.12 N 70.35004090 W 149. 32566792 261.00 0.15 220.20 184.70 261.00 0.11 0.73 0.62 0.21 0.58 0.42 5978062. 97 583058.24 N 70.35004077 W 149. 32566697 359.00 0.23 82.19 282.70 359.00 0.02 0.94 0.70 0.14 0.69 0.36 5978062. 90 583058.35 N 70.35004057 W 149. 32566606 451.00 0.57 302.40 374.70 451.00 0.32 1.37 0.64 0.41 0.49 0.83 5978063. 17 583058.14 N 70.35004131 W 149. 32566771 543.00 1.94 299.46 466.67 542.97 1.62 3.39 1.90 1.42 -1.26 1.49 5978064. 16 583056.39 N 70.35004407 W 149. 32568185 635.00 3.46 299.31 558.57 634.87 4.39 7.72 6.16 3.55 -5.03 1.65 5978066. 24 583052.59 N 70.35004988 W 149. 32571251 727.00 4.26 302.95 650.36 726.66 8.49 13.91 12.34 6.76 -10.32 0.91 5978069. 40 583047.27 N 70.35005867 W 149. 32575544 819.00 4,17 301.29 742.11 818.41 13.05 20.67 19.10 10.36 -16.05 0.16 5978072. 93 583041.50 N 70.35006849 W 149. 32580192 911.00 4.63 294.91 833.84 910.14 17.41 27.72 26.13 13.66 -22.27 0.73 5978076. 16 583035.24 N 70.35007751 W 149. 32 7 1004.00 5.04 292.48 926.51 1002.81 21.78 35.56 33.91 16.80 -29.45 0.49 5978079. 23 583028.03 N 70.35008610 W 149. 32 1097.00 5.50 287.29 1019.12. 1095.42 26.05 44.10 42.34 19.69 -37.48 0.71 5978082. 02 583019.97 N 70.35009398 W 149. 3259 93 1191.00 5.33 288.96 1112.70 1189.00 30.26 52.97 51.11 22.45 -45.91 0.25 5978084. 69 583011.51 N 70.35010151 W 149. 32604437 1284.00 4.65 284.94 1205.34 1281.64 33.97 61.05 59.11 24.82 -53.64 0.82 5978086. 98 583003.75 N 70.35010800 W 149. 32610710 Last GYD GC SS 1378.00 3.32 273.56 1299.12 1375.42 36.24 67.57 65.42 25.98 -60.04 1.64 5978088. 06 582997.34 N 70.35011115 W 149. 32615904 First MWD+IFR+MS 1414.07 2.62 256.75 1335.14 1411.44 36.45 69.42 67.07 25.85 -61.88 3.08 5978087. 91 582995.50 N 70.35011081 W 149. 32617402 1508.01 0.88 223.62 1429.03 1505.33 35.91 72.23 69.09 24.84 -64.47 2.07 5978086. 87 582992.92 N 70.35010804 W 149. 32619503 1600.87 0.60 206.29 1521.88 1598.18 35.10 73.42 69.42 23.88 -65.18 0.38 5978085. 91 582992.23 N 70.35010544 W 149. 32620077 1693.90 0.74 206.04 1614.91 1691.21 34.23 74.51 69.54 22.91 -65.66 0.15 5978084. 93 582991.76 N 70.35010277 W 149. 32620466 1787.38 0.90 211.12 1708.38 1784.68 33.19 75.84 69.77 21.74 -66.30 0.19 5978083. 75 582991.13 N 70.35009957 W 149. 32620989 1881.21 1.00 205.58 1802.19 1878.49 31.97 77.40 70.06 20.37 -67.04 0. i 4 5978082. 37 582990.41 N 70.35009583 W 149. 32621585 1975.48 1.07 204.46 1896.45 1972.75 30.58 79.10 70.32 18.82 -67.76 0.08 5978080. 82 582989.71 N 70.35009161 W 149. 32622170 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) L-51\L-51\L-51\L-51 Generated 7/26/2006 10:10 AM Page 1 of 8 Comments Measured Inclination Azimuth Sulrfiea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft n n n n ft de 00 ft ftUS ftUS 1089.17 0.75 ZU/.12 1990.13 1088.43 29.37 80.59 7U.SU 1 /.48 -68.40 0.34 59/SU/9. 4/ 5131989.08 N 70.35UU8/95 W 149.31822890 2161 .47 0.35 32.82 2082.43 2158.73 29.10 81.09 70. 64 17. 18 -68.52 1.19 5978079. 17 582988.96 N 70.35008713 W 149.32622790 2256 .14 0.69 12.25 2177.09 2253.39 29.84 81.94 70. 57 17. 98 -68.24 0.40 5978079. 97 582989.23 N 70.35008931 W 149.32622565 2349 .96 0.59 14.38 2270.91 2347.21 30.80 82.99 70. 61 19. 00 -68.00 0.11 5978081. 00 582989.46 N 70.35009210 W 149.32622370 2443 .28 0.55 18.65 2364.22 2440.52 31.63 83.92 70. 60 19. 89 -67.74 0.06 5978081. 89 582989.71 N 70.35009453 W 149.32622157 2535 .42 0.54 6.75 2456.36 2532.66 32.43 84.79 70. 66 20. 74 -67.55 0.12 5978082. 74 582989.89 N 70.35009685 W 149.32622001 2628 .58 3.57 339.85 2549.45 2625.75 35.71 88.10 72. 55 23. 90 -68.50 3.33 5978085. 89 582988.91 N 70.35010548 W 149.32622770 2647 .82 3.95 339.58 2568.65 2644.95 36.95 89.36 73. 36 25. 08 -68.93 1.98 5978087. 07 582988.46 N 70.35010872 W 149.32623125 2754 .30 5.43 326.00 2674.77 2751.07 45.17 98.03 80. 02 32. 70 -73.03 1.73 5978094. 63 582984.28 N 70.35012952 W 149.32626451 2849 .67 7.27 315.68 2769.55 2845.85 54.30 108.55 89. 58 40. 76 -79.77 2.26 5978102. 62 582977.45 N 70.35015153 W 149.32631923 2945. 8 i 8.13 323.10 2864.83 2941.13 65.42 121.41 101. 57 50. 55 -88.10 1.37 5978112. 31 582969.01 N 70.35017828 W 149.326 7 3041. 89 9.52 328.54 2959.77 3036.07 78.90 136.14 114. 97 62. 76 -96.33 1.69 5978124. 43 582960.65 N 70.35021164 W 149.32( 3136 .76 11.28 329.86 3053.08 3129.38 94.94 153.27 130. 56 77. 48 -105.08 1.87 5978139. 05 582951.73 N 70.35025184 W 149.32652472 3232 .05 13.81 327.43 3146.09 3222.39 114.23 173.96 149. 93 95. 12 -115.89 2.71 5978156. 57 582940.74 N 70.35030005 W 149.32661242 3327 .86 16.94 330.37 3238.46 3314.76 137.98 199.35 174. 05 116. 90 -128.95 3.37 5978178. 20 582927.44 N 70.35035954 W 149.32671845 3423 .80 20.20 335.66 3329.40 3405.70 167.24 229.88 202. 83 144. 15 -142.69 3.82 5978205. 29 582913.40 N 70.35043398 W 149.32683001 3519 .82 25.28 334.47 3417.92 3494.22 203.12 266.99 238. 08 177. 78 -158.37 5.31 5978238. 74 582897.35 N 70.35052585 W 149.32695729 3614 .96 29.29 331.35 3502.47 3578.77 244.82 310.58 280. 50 216. 55 -178.29 4.47 5978277. 29 582877.00 N 70.35063177 W 149.32711903 3711 .35 30.77 327.31 3585.92 3662.22 289.99 358.81 328. 23 258. 00 -202.92 2.60 5978318. 46 582851.92 N 70.35074500 W 149.32731895 3805 .93 33.10 325.21 3666.18 3742.48 335.85 408.83 378. 12 299. 57 -230.72 2.73 5978359. 72 582823.65 N 70.35085858 W 149.32754470 3907 .89 36.34 326.67 3749.98 3826.28 388.98 466.89 436. 09 347. 69 -263.21 3.28 5978407. 47 582790.63 N 70.35099004 W 149.32780849 4004 .07 37.04 328.00 3827.11 3903.41 442.10 524.35 493. 40 396. 07 -294.22 1.10 5978455. 50 582759.09 N 70.35112220 W 149.32806025 4099 .66 37.07 328.41 3903.39 3979.69 495.68 581.95 550. 81 445. 03 -324.57 0.26 5978504. 11 582728.21 N 70.35125594 W 149.32830665 4195 .34 37.45 328.05 3979.54 4055.84 549.57 639.88 608. 59 494. 27 -355.07 0.46 5978553. 01 582697.16 N 70.35139047 W 149.32855427 4290 .73 39.30 327.20 4054.32 4130.62 604.42 699.10 667. 72 544. 28 -386.79 2.02 5978602. 66 582664.90 N 70.35152708 W 149.32881177 4386 .58 39.86 327.19 4128.20 4204.50 660.82 760.17 728. 73 595. 61 -419.88 0.58 5978653. 61 582631.25 N 70.35166731 W 149.32908041 4482 .49 39.24 325.60 4202.15 4278.45 716.88 821.24 789. 77 646. 47 -453.67 1.24 5978704. 10 582596.90 N 70.35180626 W 149.32935478 4577. 50 39.03 325.24 4275.85 4352.15 771.52 881.20 849. 74 695. 85 -487.70 0.33 5978753. 08 582562.32 N 70.35194113 W 149.32963111 4673 .86 39.57 325.54 4350.42 4426.72 827.12 942.23 910. 77 746. 08 -522.37 0.59 5978802. 92 582527.11 N 70.35207835 W 149.32 4769 .66 38.52 323.56 4424.82 4501.12 881.73 1002.58 971. 11 795. 24 -557.35 1.70 5978851. 69 582491.58 N 70.35221265 W 149.33 4864 .91 36.88 322.81 4500.18 4576.48 933.82 1060.82 1029: 33 841. 87 -592.25 1.79 5978897. 93 582456.17 N 70.35234004 W 149.33047999 4960 .33 37.13 322.70 4576.38 4652.68 985.00 1118.25 1086. 72 887. 59 -627.01 0.27 5978943. 25 582420.91 N 70.35246493 W 149.33076222 5056 .08 37.17 322.75 4652.70 4729.00 1036.51 1176.08 1144. 51 933. 60 -662.03 0.05 5978988. 87 582385.39 N 70.35259063 W 149.33104658 5151 .62 37.38 325.68 4728.73 4805.03 1088.71 1233.93 1202. 36 980. 53 -695.85 1.87 5979035. 42 582351.05 N 70.35271883 W 149.33132122 5246 .90 37.73 326.59 4804.27 4880.57 1141.92 1292.01 1260. 41 1028. 76 -728.21 0.69 5979083. 28 582318.16 N 70.35285056 W 149.33158398 5343 .58 37.32 329.94 4880.95 4957.25 1196.70 1350.89 1319. 17 1078. 82 -759.18 2.15 5979132. 99 582286.64 N 70.35298732 W 149.33183548 5438 .72 36.19 334.68 4957.19 5033.49 1250.96 1407.80 1375. 61 1129. 18 -785.65 3.21 5979183. 05 582259.62 N 70.35312490 W 149.33205039 5534 .05 36.46 334.58 5034.00 5110.30 1305.48 1464.27 1431. 34 1180. 21 -809.85 0.29 5979233. 80 582234.86 N 70.35326429 W 149.33224688 5629 .75 36.00 337.32 5111.20 5187.50 1360.39 1520.82 1487. 00 1231. 84 -832.90 1.76 5979285. 17 582211.24 N 70.35340535 W 149.33243409 5726 .13 35.40 337.08 5189.47 5265.77 1415.29 1577.06 1542. 19 1283. 69 -854.69 0.64 5979336. 77 582188.87 N 70.35354698 W 149.33261109 5821 .61 36.88 335.81 5266.57 5342.87 1470.08 1633.37 1597. 66 1335. 30 -877.20 1.74 5979388. 12 582165.79 N 70.35368797 W 149.33279391 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-51\L-51\L-51\L-51 Generated 7/26/2006 10:10 AM Page 2 of 8 Measured Vertical Along Nole Comments Depth Inclination Azimuth SulrSea ND ND Section Departure Closure NS EW DLS Northing Easting Latitude Longitude ft de de ft ft N ft ft ft it de 00 ft ftUS ftUS byl(i.yy ;i/.yy ;iili.Ul S:i4L.:il 541tS.Ei1 151fi.;itf 1(iyl.:i5 1(154.91 l:ittti.L;i -9UU.t3/ 1.1/ b9/944U./tf 6012.86 38.22 336.21 5417.75 5494.05 1583.87 1750.51 1713.36 1442. 32 -924. 83 0.27 5979494 .60 6108.66 36.86 337.31 5493.71 5570.01 1640.74 1808.88 1770.97 1495 .95 -947. 86 1.58 5979547 .97 6201.50 36.28 337.87 5568.27 5644.57 1694.82 1864.19 1825.47 1547. 09 -968. 95 0.72 5979598 .86 6295.10 36.15 338.94 5643.79 5720.09 1749.03 1919.49 1879.88 1598. 51 -989. 31 0.69 5979650 .04 6388.59 36.64 339.54 5719.04 5795.34 1803.58 1974.96 1934.36 1650. 38 -1008. 97 0.65 5979701 .69 6482.79 39.35 338.79 5793.27 5869.57 1860.57 2032.94 1991.38 1704. 56 -1029. 60 2.92 5979755 .64 6575.68 39.14 339.00 5865.21 5941.51 1918.28 2091.71 2049.28 1759. 39 -1050. 76 0.27 5979810. 22 6668.12 38.20 338.52 5937.38 6013.68 1974.98 2149.47 2106.25 1813. 22 -1071. 68 1.07 5979863 .81 6761.72 37.25 338.90 6011.42 6087.72 2031.19 2206.74 2162.79 1866. 58 -1092. 48 1.04 5979916 .94 6856.04 37.84 337.42 6086.20 6162.50 2087.49 2264.21 2219.65 1919. 93 -1113. 87 1.14 5979970 .04 6949.25 38.95 338.53 6159.25 6235.55 2144.17 2322.10 2276.97 1973. 60 -1135. 57 1.40 5980023 .45 7042.53 37.56 338.11 6232.50 6308.80 2200.77 2379.86 2334.14 2027. 26 -1156. 90 1.52 5980076 .88 7134.29 38.04 338.46 6305.01 6381.31 2255.89 2436.10 2389.85 2079. 51 -1177. 71 0.57 5980128. 89 7227.59 38.33 340.43 6378.34 6454.64 2312.63 2493.77 2446.83 2133. 52 -1197. 95 1.34 5980182. 66 7321.34 38.23 340.57 6451.94 6528.24 2369.96 2551.85 2504.08 2188. 26 -1217. 34 0.14 5980237 .18 7415.40 38.80 340.72 6525.53 6601.83 2427.79 2610.42 2561.83 2243. 53 -1236. 75 0.61 5980292 .22 7507.45 38.18 338.66 6597.59 6673.89 2484.20 2667.71 2618.49 2297. 25 -1256. 63 1.55 5980345 .72 7600.96 36.66 335.46 6671.86 6748.16 2539.62 2724.52 2675.01 2349. 57 -1278. 74 2.64 5980397. 78 7694.05 36.14 336.19 6746.78 6823.08 2593.23 2779.76 2730.09 2399. 97 -1301. 37 0.73 5980447. 92 7787.78 36.72 335.39 6822.20 6898.50 2647.25 2835.42 2785.60 2450. 73 -1324. 20 0.80 5980498. 42 7880.73 37.53 335.58 6896.31 6972.61 2701.62 2891.52 2841.57 2501. 77 -1347. 47 0.88 5980549 .20 7974.44 36.90 335.12 6970.94 7047.24 2756.51 2948.20 2898.14 2553. 28 -1371. 11 0.73 5980600 .44 8068.71 37.52 334.45 7046.01 7122.31 2811.59 3005.20 2955.07 2604. 86 -1395. 40 0.79 5980651. 74 8160.53 38.26 335.55 7118.48 7194.78 2866.12 3061.59 3011.37 2655. 97 -1419. 22 1.09 5980702. 57 8250.12 38.03 336.25 7188.94 7265.24 2919.85 3116.93 3066.57 2706. 48 -1441. 82 0.55 5980752. 83 8342.51 38.02 336.11 7261.72 7338.02 2975.17 3173.84 3123.33 2758. 54 -1464. 80 0.09 5980804. 63 8437.08 37.57 335.59 7336.45 7412.75 3031.43 3231.80 3181.16 2811. 43 -1488. 51 0.58 5980857. 24 8530.64 37.42 335.60 7410.68 7486.98 3086.65 3288.75 3238.01 2863. 29 -1512. 04 0.16 5980908 .83 8623.34 37.24 338.32 7484.39 7560.69 3141.46 3344.95 3294.01 2915. 00 -1534. 04 1.79 5980960 .30 8717.75 37.10 344.99 7559.65 7635.95 3197.85 3401.95 3350.23 2969. 07 -1551. 98 4.27 5981014 .16 8810.85 39.22 350.65 7632.88 7709.18 3255.29 3459.44 3405.65 3025. 26 -1564. 04 4.39 5981070. 21 8904.45 40.18 354.58 7704.91 7781.21 3314.97 3519.21 3461.86 3084. 52 -1571. 70 2.86 5981129. 37 8998.49 42.11 356.78 7775.74 7852.04 3376.48 3581.06 3519.00 3146. 20 -1578. 33 2.58 5981190. 99 9093.15 45.03 357.53 7844.32 7920.62 3441.17 3646.30 3578.80 3211. 35 -1579. 56 3.13 5981256. 10 9187.40 45.50 358.81 7910.66 7986.96 3507.40 3713.25 3639.89 3278. 27 -1581. 69 1.09 5981322 .98 9280.96 45.34 359.06 7976.33 8052.63 3573.19 3779.89 3700.54 3344. 90 -1582. 93 0.26 5981389 .58 9374.13 44.37 0.05 8042.37 8118.67 3637.94 3845.60 3760.26 3410. 61 -1583. 45 1.28 5981455 .28 9467.11 44.95 0.39 8108.51 8184.81 3702.21 3910.96 3819.53 3475. 96 -1583. 20 0.67 5981520 .62 9560.64 46.65 1.78 8173.71 8250.01 3767.94 3978.00 3880.11 3542. 99 -1581. 92 2.11 5981587. 66 9653.55 46.25 2.26 8237.73 8314.03 3833.74 4045.34 3940.71 3610. 29 -1579. 54 0.57 5981654. 97 bt31141.55 N /U.:i5:tt3:i2b(3 W 149.:i:319t36U9 582116.99 N 70.35398032 W 149.33318068 582093.36 N 70.35412683 W 149.33336780 582071.71 N 70.35426652 W 149.33353908 582050.79 N 70.35440698 W 149.33370440 582030.56 N 70.35454867 W 149.33386409 582009.33 581987.56 581966.05 581944.66 581922.69 581900.40 581878.47 581857.09 581836.25 581816.26 N 70.35469670 W 149.33403169 N 70.35484647 W 149.33420356 N 70.35499353 W 149.33437351 N 70.35513930 W 149.33454243 N 70.35528503 W 149.334 N 70.35543163 W 149.334 3 N 70.35557824 W 149.33506572 N 70.35572098 W 149.33523474 N 70.35586849 W 149.33539921 N 70.35601805 W 149.33555671 581796.24 N 70.35616901 W 149.33571441 581775.77 N 70.35631577 W 149.33587588 581753.08 N 70.35645870 W 149.33605553 581729.90 N 70.35659636 W 149.33623932 581706.51 N 70.35673503 W 149.33642476 581682.67 N 70.35687446 W 149.33661385 581658.47 N 70.35701518 W 149.33680587 581633.61 N 70.35715606 W 149.33700319 581609.22 N 70.35729567 W 149.33719675 581586.07 N 70.35743365 W 149.33738033 581562.51 N 70.35757588 W 149.33756706 581538.22 N 70.35772034 W 149.337 581514.12 N 70.35786200 W 149.33 581491.55 N 70.35800328 W 149.33 581473.02 N 70.35815098 W 149.33827534 581460.34 N 70.35830448 W 149.33837337 581452.02 N 70.35846636 W 149.33843568 581446.70 N 70.35863485 W 149.33847343 581442.76 N 70.35881285 W 149.33849974 581439.88 N 70.35899565 W 149.33851720 581437.90 N 70.35917768 W 149.33852737 581436.66 N 70.35935719 W 149.33853167 581436.19 N 70.35953573 W 149.33852973 581436.72 N 70.35971886 W 149.33851944 581438.35 N 70.35990271 W 149.33850029 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-51\L-51\L-51\L-51 Generated 7/26/2006 10:10 AM Page 3 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS 9748.43 45.75 1.83 8303.64 8379.94 3900.43 4113.59 4002.33 3678.50 -1577.11 0.62 5981723 .20 581440.03 N 70 .36008905 W 149 .33848062 9841 .95 45.39 0.46 8369.11 8445.41 3965.89 4180.37 4063. 26 3745.26 -1575. 77 1.11 5981789 .97 581440.63 N 70 .36027145 W 149 .33846987 9886 .85 46.50 359.52 8400.33 8476.63 3997.64 4212.64 4093. 02 3777.53 -1575. 78 2.89 5981822 .23 581440.26 N 70 .36035960 W 149 .33846999 9936 .28 48.02 359.85 8433.87 8510.17 4033.40 4248.94 4126. 62 3813.83 -1575. 98 3.11 5981858 .52 581439.66 N 70 .36045877 W 149 .33847166 10028 .15 53.22 1.59 8492.14 8568.44 4103.08 4319.93 4191. 96 3884.81 -1575. 04 5.85 5981929 .50 581439.81 N 70 .36065267 W 149 .33846421 10121 .87 58.67 358.54 8544.61 8620.91 4179.44 4397.54 4263. 97 3962.41 -1575. 02 6.41 5982007. 09 581438.97 N 70 .36086468 W 149. 33846417 10215 .23 64.04 356.81 8589.36 8665.66 4260.56 4479.44 4341. 33 4044.24 -1578. 38 5.98 5982088. 87 581434.71 N 70 .36108823 W 149. 33849155 10241 .17 64.99 356.58 8600.52 8676.82 4283.80 4502.86 4363. 61 4067.62 -1579. 73 3.75 5982112. 23 581433.10 N 70 .36115209 W 149. 33850256 10291 .44 65.15 356.05 8621.71 8698.01 4329.09 4548.45 4407. 09 4113.11 -1582. 66 1.01 5982157. 68 581429.67 N 70 .36127637 W 149. 33852644 10342 .15 65.91 354.97 8642.71 8719.01 4375.01 4594.60 4451. 36 4159.12 -1586. 27 2.45 5982203. 65 581425.54 N 70 .36140207 W 149. 33855587 10373 .61 71.27 353.84 8654.19 8730.49 4404.19 4623.88 4479. 61 4188.26 -1589. 13 17.36 5982232. 75 581422.36 N 70 .36148167 W 149. 33 10407 .47 79.40 353.83 8662.76 8739.06 4436.84 4656.61 4511. 28 4220.80 -1592. 65 24.01 5982265. 24 581418.48 N 70 .36157056 W 149. 338 10438 .40 86.66 353.90 8666.51 8742.81 4467.44 4687.29 4540. 99 4251.31 -1595. 92 23.47 5982295. 71 581414.87 N 70 .36165390 W 149. 33863444 10469 .92 89.40 355.71 8667.59 8743.89 4498.82 4718.79 4571. 37 4282.67 -1598. 78 10.42 5982327. 04 581411.67 N 70 .36173959 W 149. 33865765 10501 .38 89.40 355.71 8667.92 8744.22 4530.11 4750.24 4601. 59 4314.04 -1601. 13 0.00 5982358. 38 581408.97 N 70 .36182529 W 149. 33867682 10534 .22 89.40 356.35 8668.26 8744.56 4562.75 4783.08 4633. 10 4346.80 -1603. 40 1.95 5982391. 11 581406.33 N 70 .36191478 W 149. 33869535 10570 .26 89.49 354.25 8668.61 8744.91 4598.61 4819.12 4667. 83 4382.72 -1606. 36 5.83 5982426. 98 581402.98 N 70 .36201289 W 149. 33871939 10616 .31 89.70 352.35 8668.94 8745.24 4644.57 4865.17 4712. 63 4428.45 -1611. 73 4.15 5982472. 65 581397.10 N 70 .36213783 W 149. 33876311 10665 .25 88.74 351.02 8669.61 8745.91 4693.48 4914.10 4760. 56 4476.87 -1618. 80 3.35 5982520. 98 581389.49 N 70 .36227010 W 149. 33882067 10711 .11 85.96 353.77 8671.73 8748.03 4739.23 4959.91 4805. 32 4522.27 -1624. 87 8.52 5982566. 31 581382.93 N 70 .36239412 W 149. 33887000 10761 .33 84.41 353.53 8675.94 8752.24 4789.16 5009.95 4854. 01 4572.00 -1630. 40 3.12 5982615. 97 581376.84 N 70 .36252999 W 149. 33891504 10806 .83 85.17 351.74 8680.07 8756.37 4834.41 5055.26 4898. 30 4616.94 -1636. 21 4.26 5982660. 84 581370.54 N 70 .36265275 W 149. 33896231 10856 .90 85.13 351.74 8684.31 8760.61 4884.27 5105.16 4947. 24 4666.31 -1643. 38 0.08 5982710. 12 581362.82 N 70 .36278763 W 149. 33902061 10903 .46 85.03 351.54 8688.30 8764.60 4930.63 5151.54 4992. 78 4712.21 -1650. 12 0.48 5982755. 94 581355.57 N 70 .36291300 W 149. 33907548 10952 .57 85.13 352.34 8692.51 8768.81 4979.53 5200.47 5040. 77 4760.65 -1656. 98 1.64 5982804. 30 581348.17 N 70 .36304535 W 149. 33913129 11000 .36 85.03 353.28 8696.61 8772.91 5027.07 5248.09 5087. 36 4807.89 -1662. 94 1.97 5982851. 46 581341.69 N 70 .36317440 W 149. 33917979 11048 .36 85.00 352.24 8700.78 8777.08 5074.82 5295.91 5134. 17 4855.33 -1668. 97 2.16 5982898. 83 581335.14 N 70 .36330398 W 149. 33922882 11094 .80 85.61 352.06 8704.58 8780.88 5121.07 5342.19 5179. 59 4901.18 -1675. 29 1.37 5982944. 60 581328.31 N 70 .36342924 W 149. 33928025 11144 .06 86.75 351.28 8707.86 8784.16 5170.19 5391.34 5227. 92 4949.81 -1682. 41 2.80 5982993. 14 581320.65 N 70 .36356209 W 149. 3 11171 .08 87.64 348.78 8709.19 8785.49 5197.17 5418.33 5254. 59 4976.39 -1687. 08 9.81 5983019. 67 581315.69 N 70 .36363469 W 149. 3 33 11202 .46 88.77 349.45 8710.17 8786.47 5228.53 5449.69 5285. 66 5007.19 -1693. 01 4.19 5983050. 39 581309.43 N 70 .36371883 W 149. 33942436 11237 .06 90.79 346.12 8710.30 8786.60 5263.11 5484.29 5320. 03 5041.00 -1700. 32 11.26 5983084. 12 581301.73 N 70 .36381119 W 149. 33948387 11264 .30 92.98 348.04 8709.41 8785.71 5290.30 5511.51 5347. 12 5067.53 -1706. 41 10.69 5983110. 58 581295.35 N 70 .36388367 W 149. 33953337 11296 .83 93.71 347.61 8707.51 8783.81 5322.76 5543.99 5379. 39 5099.27 -1713. 26 2.60 5983142. 24 581288.15 N 70 .36397039 W 149. 33958906 11327 .15 93.44 346.77 8705.62 8781.92 5352.99 5574.25 5409. 50 5128.78 -1719. 97 2.90 5983171. 67 581281.12 N 70 .36405100 W 149. 33964362 11357 .43 92.99 349.32 8703.92 8780.22 5383.20 5604.48 5439. 53 5158.35 -1726. 23 8.54 5983201. 17 581274.53 N 70 .36413179 W 149. 33969454 11388 .47 91.62 349.19 8702.67 8778.97 5414.22 5635.49 5470. 26 5188.83 -1732. 01 4.43 5983231. 57 581268.41 N 70 .36421503 W 149. 33974157 11420 .17 89.97 350.44 8702.23 8778.53 5445.91 5667.19 5501. 63 5220.02 -1737. 62 6.53 5983262. 70 581262.46 N 70 .36430025 W 149. 33978716 11451 .34 88.15 350.77 8702.74 8779.04 5477.07 5698.35 5532. 41 5250.77 -1742. 71 5.93 5983293. 39 581257.03 N 70 .36438424 W 149. 33982854 11483 .10 86.71 351.51 8704.17 8780.47 5508.79 5730.08 5563. 71 5282.12 -1747. 59 5.10 5983324. 68 581251.80 N 70 .36446988 W 149. 33986830 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-51\L-51\L-51\L-51 Generated 7/26/2006 10:10 AM Page 4 of 8 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de ft tt tt ft it ft ft de 100 ft ttUS ftUS 17514 .tfb t5t7.b4 :i51.25b tl/Vb .U4 ii/CL.:54 bb4U.4i5 5/bl./y bb`J4.yJ Sail J. 4y -1 /bL.I PS 11545 .42 86.78 351.74 8707 ,82 8784.12 5570.97 5792.29 5624.98 5343. 68 -1756.53 11576 .77 87.02 351.56 8709 .51 8785.81 5602.25 5823.60 5655.82 5374. 66 -1761.07 11607 .55 87.43 350.94 8711 .00 8787.30 5632.99 5854.34 5686.15 5405. 04 -1765.75 11637 .86 87.64 349.79 8712 .31 8788.61 5663.27 5884.62 5716.11 5434. 90 -1770.82 11669 .67 87.95 349.67 8713 .53 8789.83 5695.05 5916.41 5747.60 5466. 17 -1776.49 11701 .19 86.57 350.38 8715 .04 8791.34 5726.53 5947.89 5778.78 5497. 18 -1781.94 11731 .01 85.89 352.75 8717 .00 8793.30 5756.27 5977.65 5808.13 5526. 61 -1786.30 11763 .20 86.03 352.30 8719 .27 8795.57 5788.34 6009.76 5839.71 5558. 45 -1790.48 11794 .55 85.79 352.21 8721 .50 8797.80 5819.58 6041.03 5870.49 5589. 43 -1794.70 11825 .35 86.65 352.68 8723 .53 8799.83 5850.28 6071.76 5900.74 5619. 90 -1798.74 11856 .92 87.13 352.63 8725 .24 8801.54 5881.77 6103.28 5931.75 5651. 16 -1802.77 11889 .16 86.99 353.04 8726 .90 8803.20 5913.92 6135.48 5963.41 5683. 11 -1806.78 11918 .58 87.74 352.10 8728 .25 8804.55 5943.27 6164.87 5992.33 5712. 25 -1610.58 11950 .04 87.85 350.62 8729 .46 8805.76 5974.69 6196.31 6023.39 5743. 33 -1815.31 11981 .21 88.33 349.78 8730 .50 8806.80 6005.84 6227.46 6054.26 5774. 03 -1820.61 12012 .29 88.29 349.86 8731 .42 8807.72 6036.91 6258.53 6085.07 5804. 61 -1826.10 12043 .54 88.29 350.61 8732 .35 8808.65 6068.15 6289.76 6116.03 5835. 39 -1831.40 12074 .43 89.90 349.98 8732 .84 8809.14 6099.03 6320.65 6146.63 5865. 83 -1836.60 12104 .16 90.35 349.58 8732 .77 8809.07 6128.76 6350.38 6176.13 5895. 09 -1841.88 12134. 97 90.14 351.70 8732 .64 8808.94 6159.56 6381.19 6206.64 5925. 49 -1846.89 12166 .24 90.18 352.77 8732 .55 8808.85 6190.80 6412.46 6237.48 5956. 47 -1851.11 12197 .03 89.83 354.98 8732 .55 8808.85 6221.51 6443.25 6267.69 5987. 08 -1854.40 12227 .79 88.80 358.40 8732 .92 8809.22 6252.04 6474.00 6297.55 6017. 78 -1856.17 12259. 33 88.25 359.21 8733 .73 8810.03 6283.18 6505.53 6327.87 6049. 31 -1856.83 12289 .30 89.45 2.50 8734 .33 8810.63 6312.57 6535.50 6356.38 6079. 26 -1856.38 12320 .91 88.80 5.47 8734 .82 8811.12 6343.21 6567.10 6385.90 6110. 79 -1854.19 12351 .95 89.59 7.05 8735 .25 8811.55 6372.96 6598.14 6414.45 6141. 64 -1850.80 12382 .85 90.00 8.24 8735 .36 8811.66 6402.37 6629.04 6442.60 6172. 26 -1846.69 12414. 38 90.07 8.44 8735 .34 8811.64 6432.25 6660.57 6471.19 6203. 46 -1842.12 12447 .16 88.53 10.72 8735 .74 8812.04 6463.08 6693.35 6500.64 6235. 78 -1836.67 12476 .97 87.70 10.41 8736 .72 8813.02 6490.93 6723.14 6527.20 6265. 07 -1831.20 12508 .78 87.43 9.73 8738 .08 8814.38 6520.74 6754.92 6555,69 6296. 36 -1825.65 12539. 74 87.22 8.91 8739 .52 8815.82 6549.87 6785.85 6583.62 6326. 88 -1820.64 12570 .08 86.88 8.69 8741 .08 8817.38 6578.51 6816.15 6611.13 6356. 82 -1816.00 12601 .90 86.12 8.95 8743 .02 8819.32 6608.53 6847.91 6639.98 6388. 20 -1811.13 12633 .14 86.60 8.96 8745 .01 8821.31 6637.97 6879.08 6668.30 6419. 00 -1806.28 12664 .12 86.53 9.01 8746 .86 8823.16 6667.17 6910.01 6696.41 6449. 55 -1801.45 12694 .70 86.23 9.17 8748 .79 8825.09 6695.97 6940.53 6724.15 6479. 68 -1796.63 12726 .58 86.26 8.74 8750 .88 8827.18 6726.01 6972.34 6753.12 6511. 11 -1791.68 12756.17 85.95 8.53 8752.89 8829.19 6753.94 7001.86 6780.09 6540.29 -1787.24 I.LL Jyt53Jbb.yy St51 L4b.t5/ IV /V..Sb4bbbbt5 YY 14`J.33`J`JUSbV 0.88 5983386. 14 581242.18 N 70.36463807 W 149. 33994101 0.96 5983417. 05 581237.29 N 70.36472268 W 149. 33997800 2.41 5983447. 38 581232.28 N 70.36480569 W 149. 34001605 3.85 5983477. 1$ 581226.88 N 70.36488724 W 149. 34005728 1.04 5983508. 38 581220.87 N 70.36497269 W 149. 34010338 4.92 5983539. 33 581215.07 N 70.36505739 W 149. 34014774 8.25 5983568. 70 581210.38 N 70.36513779 W 149. 34018325 1.46 5983600. 49 581205.85 N 70.36522477 W 149. 34021725 0.82 5983631. 42 581201.30 N 70.36530941 W 149. 34025155 3.18 5983661. 84 581196.92 N 70.36539264 W 149. 340 1.53 5983693. 06 581192.54 N 70.36547805 W 149. 34a~ 1.34 5983724. 95 581188.17 N 70.36556532 W 149. 340 4.08 5983754. 05 581184.05 N 70.36564493 W 149. 34038085 4.71 5983785. 07 581178.99 N 70.36572983 W 149. 34041928 3.10 5983815. 70 581173.34 N 70.36581369 W 149. 34046241 0.29 5983846. 22 581167.51 N 70.36589722 W 149. 34050708 2.40 5983876. 93 581161.88 N 70.36598131 W 149. 34055018 5.60 5983907. 32 581156.33 N 70.36606448 W 149. 34059254 2.03 5983936. 51 581150.74 N 70.36614440 W 149. 34063546 6.91 5983966. 85 581145.39 N 70.36622744 W 149. 34067622 3.42 5983997. 78 581140.82 N 70.36631208 W 149. 34071061 7.27 5984028. 35 581137.20 N 70.36639571 W 149. 34073736 11.61 5984059. 03 581135.08 N 70.36647958 W 149. 34075185 3.10 5984090. 54 581134.07 N 70.36656570 W 149. 34075725 11.68 5984120. 49 581134.19 N 70.36664753 W 149. 34075368 9.62 5984152. 04 581136.04 N 70.36673366 W 149. 34073590 5.69 5984182. 92 581139.08 N 70.36681795 W 149. 34070846 4.07 5984213. 59 581142.85 N 70.36690161 W 149. 34067513 0.67 5984244. 83 581147.08 N 70.36698684 W 149. 34 8.39 5984277. 20 581152.17 N 70.36707513 W 149. 34059378 2.97 5984306. 55 581157.31 N 70.36715515 W 149. 34054946 2.30 5984337. 90 581162.52 N 70.36724064 W 149. 34050437 2.73 5984368. 46 581167.19 N 70.36732401 W 149. 34046374 1.33 5984398. 45 581171.49 N 70.36740582 W 149. 34042614 2.52 5984429. 89 581176.01 N 70.36749156 W 149. 34038663 1.54 5984460. 73 581180.52 N 70.36757570 W 149. 34034727 0.28 5984491. 33 581185.01 N 70.36765915 W 149. 34030809 1.11 5984521. 51 581189.50 N 70.36774148 W 149. 34026897 1.35 5984552. 99 581194.10 N 70.36782733 W 149. 34022880 1.26 5984582.22 581198.21 N 70.36790707 W 149.34019284 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-51\L-51\L-51\L-51 Generated 7/26/2006 10:10 AM Page 5 of 8 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de ft ft n n ft tt ft de 00 ft ftUS ttUS 1L/88.99 136./1 13.45 8754.99 12820.15 88.18 8.29 8756.38 12851.43 88.66 8.96 8757.24 12882.74 89.31 9.13 8757.80 12913.27 89.73 9.05 12943.46 89.52 8.57 12974.60 89.86 8.78 13006.92 90.34 8.87 13038.25 90.72 9.00 13069.55 91.58 8.63 13100.90 92.71 8.81 13131.65 92.78 8.65 13162.92 92.16 8.89 13192.56 90.62 9.95 13223.66 88.35 10.40 13255.27 86.81 11.25 13285.97 86.67 10.87 13316.27 86.74 10.80 13347.08 86.50 10.81 13378.53 13408.75 13441..42 13472.90 13503.64 13535.14 13567.19 13597.39 13629.42 13660.36 13691.32 13722.69 13754.17 13784.50 13816.20 13847.07 13877.77 13909.35 13940.57 13970.90 85.85 86.16 86.19 85.19 85.16 85.74 86.33 86.57 87.15 87.53 87.33 87.63 88.39 88.56 88.46 9.11 9.33 9.00 6.88 5.92 6.03 7.13 5.80 5.75 5.34 3.51 2.91 4.44 4.59 4.57 14004.14 14034.68 8758.05 8758.25 8758.42 8758.36 8758.07 8757.45 8756.27 8754.80 8753.45 8752.73 8753.01 8754.35 8756.09 8757.84 8759.65 8761.75 8763.86 8766.03 8768.40 8770.99 8773.49 8775.70 8777.57 8779.33 8780.76 8782.15 8783.53 8784.62 8785.43 8786.25 88.56 4.70 8787.06 88.56 4.92 8787.83 88.11 3.92 8788.75 88.42 3.77 8789.69 89.07 3.42 8790.36 89.28 3.43 8790.83 89.38 4.02 8791.19 88:11.L9 8/84.98 /U:i4.81 881U. U8 6572.69 -1782.41 2.:i;i 5984(114.88 581LVL .89 N /U.:iB/9955/ W 149.:i4U15;iEi2 8832.68 6814.46 7065.74 6838. 63 6603. 48 -1777.88 4.75 5984645.50 581206 .87 N 70 .36807970 W 149.34011686 8833.54 6844.04 7097.01 6867. 27 6634. 40 -1773.19 2.63 5984676.46 581211 .22 N 70 .36816416 W 149.34007882 8834.10 6873.59 7128.32 6895. 88 6665. 31 -1768.27 2.15 5984707.43 581215 .80 N 70 .36824862 W 149.34003889 8834.35 6902.40 7158.84 6923. 79 6695. 46 -1763.44 1.40 5984737.62 581220 .29 N 70 .36833098 W 149.33999976 8834.55 6930.93 7189.03 6951. 47 6725. 29 -1758.82 1.74 5984767.50 581224 .58 N 70 .36841248 W 149.33996225 8834.72 6960.39 7220.17 6980. 08 6756. 07 -1754.12 1.28 5984798.33 581228 .93 N 70 .36849658 W 149.33992415 8834.66 6990.93 7252.49 7009. 76 6788. 01 -1749.17 1.51 5984830.32 581233 .54 N 70 .36858384 W 149.33988392 8834.37 7020.52 7283.82 7038. 52 6818. 96 -1744.30 1.28 5984861.32 581238 .06 N 70 .36866839 W 149.33984444 8833.75 7050.10 7315.11 7067. 30 6849. 88 -1739.50 2.99 5984892.29 581242 .51 N 70 .36875287 W 149.33980554 8832.57 7079.72 7346.44 7096. 16 6880. 85 -1734.75 3.65 5984923.30 581246 .92 N 70 .36883747 W 149.33 8831.10 7108.77 7377.16 7124. 47 6911. 21 -1730.09 0.57 5984953.71 581251 .24 N 70 9 .36892041 W 149.33 8829.75 7138.30 7408.40 7153. 27 6942. 08 -1725.33 2.13 5984984.63 581255 .66 N 70 .36900476 W 149.339 8829.03 7166.20 7438.03 7180. 48 6971. 31 -1720.48 6.31 5985013.91 581260 .19 N 70 .36908462 W 149.33965119 8829.31 7195.35 7469.12 7208. 89 7001. 92 -1714.99 7.44 5985044.58 581265 .34 N 70 .36916824 W 149.33960661 8830.65 7224.81 7500.70 7237. 62 7032. 94 -1709.06 5.56 5985075.65 581270 .93 N 70 .36925298 W 149.33955847 8832.39 7253.37 7531.36 7265. 47 7063. 02 -1703.18 1.32 5985105.80 581276 .47 N 70 .36933516 W 149.33951075 8834.14 7281.59 7561.61 7293. 03 7092. 73 -1697:49 0.33 5985135.56 581281 .83 N 70 .36941633 W 149.33946460 8835.95 7310.30 7592.36 7321. 08 7122. 94 -1691.72 0.78 5985165.84 581287. 26 N 70 .36949887 W 149.33941780 8838.05 7339.74 7623.74 7349. 91 7153. 85 -1686.30 5.78 5985196.80 581292. 34 N 70 .36958331 W 149.33937376 8840.16 7368.17 7653.89 7377. 77 7183. 60 -1681.47 1.26 5985226.60 581296. 84 N 70 .36966460 W 149.33933457 8842.33 7398.91 7686.49 7407. 93 7215. 79 -1676.27 1.01 5985258.84 581301. 68 N 70 .36975252 W 149.33929244 8844.70 7428.73 7717.88 7437. 24 7246. 87 -1671.94 7.43 5985289.97 581305. 67 N 70 .36983745 W 149.33925726 8847.29 7458.08 7748.51 7466. 14 7277. 31 -1668.52 3.11 5985320.44 581308. 74 N 70 .36992061 W 149.33922957 8849.79 7488.23 7779.91 7495. 86 7308. 54 -1665.25 1.87 5985351.70 581311. 67 N 70. 37000593 W 149.33920306 8852.00 7518.83 7811.88 7526. 02 7340. 31 -1661.59 3.89 5985383.50 581314. 98 N 70 .37009271 W 149.33917335 8853.87 7547.70 7842.02 7554. 49 7370. 25 -1658.20 4.47 5985413.48 581318. 04 N 70. 37017453 W 149.33914582 8855.63 7578.44 7874.00 7584. 83 7402. 07 -1654.98 1.82 5985445.33 581320. 90 N 70. 37026146 W 149.33911973 8857.06 7608.18 7904.91 7614. 21 7432. 84 -1651.99 1.81 5985476.12 581323. 55 N 70. 37034550 W 149.33909552 8858.45 7638.09 7935.84 7643. 80 7463. 67 -1649.61 5.94 5985506.98 581325 .59 N 70 .37042974 W 149.33 8859.83 7668.57 7967.18 7673. 97 7494. 96 -1647.85 2.14 5985538.28 581327 .00 N 70 .37051522 W 149.3390 198 8860.92 7699.11 7998.64 7704. 21 7526. 36 -1645.83 5.42 5985569.70 581328 .67 N 70 .37060099 W 149.33904565 8861.73 7728.43 8028.96 7733. 23 7556. 58 -1643.45 0.75 5985599.94 581330 .72 N 70 .37068356 W 149.33902631 8862.55 7759.06 8060.65 7763. 57 7588. 17 -1640.92 0.32 5985631.55 581332 .90 N 70 .37076986 W 149.33900580 8863.36 7788.88 8091.51 7793. 11 7618. 93 -1638.42 0.53 5985662.34 581335 .05 N 70 .37085389 W 149.33898559 8864.13 7818.52 8122.20 7822. 47 7649. 51 -1635.85 0.72 5985692.94 581337 .29 N 70 .37093744 W 149.33896473 8865.05 7849.06 8153.77 7852. 74 7680. 98 -1633.42 3.47 5985724.44 581339 .37 N 70 .37102342 W 149.33894502 8865.99 7879.32 8184.97 7882. 77 7712. 12 -1631.32 1.10 5985755.59 581341 .12 N 70 .37110848 W 149.33892807 8866.66 7908.76 8215.29 7911. 99 7742. 38 -1629.42 2.43 5985785.87 581342 .68 N 70 .37119116 W 149.33891267 8867.13 7941.06 8248.53 7944. 05 7775. 56 -1627.44 0.63 5985819.06 581344. 30 N 70 .37128180 W 149.33889660 8867.49 7970.69 8279.07 7973. 47 7806. 03 -1625.45 1.96 5985849.55 581345 .95 N 70 .37136505 W 149.33888053 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-51\L-51\L-51\L-51 Generated 7/26/2006 10:10 AM Page 6 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de n n ft ft ft ft ft de 100 n ftUS ftUS 14U(i4.b4 2ft3 .:iS :i .(ifi t3/y1.7tf tititit3.Uti /yyy .(ib t3:iUtf.SL t3UUZ. 1:t /ti:ib.t3L -1fi13.4b :i.tiS byt3btf/y.;i(i 14097 .41 87 .63 1 .72 8792.94 8869 .24 8031 .66 8341.77 8034. 05 7868.63 -1621.91 6.29 5985912.18 14129 .57 87 .98 1 .80 8794.17 8870 .47 8063 .10 8373.91 8065. 31 7900.75 -1620.93 1.12 5985944.31 14160 .38 88 .22 1 .61 8795.19 8871 .49 8093 .22 8404.70 8095. 28 7931.53 -1620.01 0.99 5985975.09 14192 .14 88 .63 1 .24 8796.06 8872 .36 8124 .31 8436.45 8126. 22 7963.27 -1619.22 1.74 5986006.84 14223 .95 88 .04 0 .43 8796.99 8873 .29 8155 .51 8468.25 8157. 29 7995.06 -1618.76 3.15 5986038.63 14254 .36 88 .35 1 .40 8797.94 8874 .24 8185 .33 8498.64 8186. 98 8025.45 -1618.27 3.35 5986069.02 14285 .63 88 .11 1 .05 8798.91 8875 .21 8215 .96 8529.90 8217. 49 8056.70 -1617.60 1.36 5986100.27 14316 .98 87 .53 359 .51 8800.10 8876 .40 8246 .76 8561.22 8248. 17 8088.03 -1617.45 5.25 5986131.59 14347 .69 87 .63 359 .51 8801.40 8877 .70 8277 .00 8591.91 8278. 31 8118.71 -1617.71 0.33 5986162.27 14378 .99 87 .74 358 .63 8802.66 8878 .96 8307 .86 8623.18 8309. 08 8149.98 -1618.22 2.83 5986193.53 14410 .43 87 .36 357 .48 8804.01 8880 .31 8338. 94 8654.59 8340. 08 8181.37 -1619.29 3.85 5986224.90 14441 .58 87 .46 356 .62 8805.42 8881 .72 8369 .81 8685.71 8370. 88 8212.45 -1620.89 2.78 5986255.96 14472 .57 87 .67 355 .69 8806.73 8883 .03 8400 .58 8716.67 8401. 59 8243.34 -1622.96 3.07 5986286.82 14503 .43 88 .11 355 .46 8807.87 8884 .17 8431 .26 8747.51 8432. 21 8274.09 -1625.34 1.61 5986317.54 14533 .06 88 .25 355 .66 8808.81 8885 .11 8460 .72 8777.12 8461. 63 8303.61 -1627.64 0.82 5986347.03 14565. 69 88 .32 354 .32 8809.79 8886 .09 8493. 20 8809.74 8494. 06 8336.10 -1630.48 4.11 5986379.49 14597 .23 88 .42 355 .05 8810.68 8886 .98 8524 .61 8841.27 8525. 43 8367.49 -1633.40 2.34 5986410.84 14627. 78 87 .56 355 .40 8811.75 8888 .05 8555. 00 8871.80 8555. 78 8397.92 -1635.95 3.04 5986441.23 14658. 91 87 .32 355 .39 8813.15 8889 .45 8585. 95 8902.90 8586. 68 8428.92 -1638.44 0.77 5986472.20 14690. 89 87 .15 356 .82 8814.69 8890 .99 8617. 69 8934.84 8618. 38 8460.79 -1640.61 4.50 5986504.04 14720. 92 87. 22 356 .62 8816.16 8892 .46 8647. 47 8964.83 8648. 11 8490.73 -1642.33 0.70 5986533.96 14752 .52 86 .12 356 .24 8818.00 8894 .30 8678 .80 8996.38 8679. 39 8522.21 -1644.29 3.68 5986565.42 14784. 58 86 .26 356 .43 8820.13 8896 .43 8710. 58 9028.37 8711. 13 8554.14 -1646.34 0.74 5986597.31 14815. 67 86 .33 355 .75 8822.14 8898 .44 8741. 41 9059.39 8741. 92 8585.09 -1648.45 2.19 5986628.24 14847. 42 86 .50 355 .50 8824.12 8900 .42 8772. 93. 9091.08 8773. 41 8616.69 -1650.87 0.95 5986659.80 14878 .53 66 .50 355 .90 8826.02 8902 .32 8803 .82 9122.13 8804. 26 8647.65 -1653.20 1.28 5986690.73 14909 .19 87 .05 356 .80 8827.75 8904 .05 8834 .23 9152.75 8834. 63 8678.20 -1655.15 3.44 5986721.26 14940. 66 87.26 356 .09 8829.31 8905 .61 8865. 44 9184. 18 8865.81 8709. 57 -1657.10 2.35 5986752. 60 14971. 77 87.63 356 .20 8830.70 8907 .00 8896. 33 9215. 25 8896.66 8740. 58 -1659.19 1.24 5986783. 58 15002. 44 87.74 355 .69 8831.93 8908 .23 8926. 79 9245. 90 8927.10 8771. 15 -1661.35 1.70 5986814. 12 15034 .33 88.04 355 .82 8833.11 8909 .41 8958 .49 9277. 77 8958.77 8802. 93 -1663.71 1.03 5986845. 87 15065 .26 87.43 355 .92 8834.33 8910 .63 8989 .22 9308. 67 8989.47 8833. 75 -1665.94 2.00 5986876. 67 15096.58 86.19 357.08 15128.31 86.02 357.29 15159.32 86.36 357.17 15190.20 86.74 357.56 15221.61 86.88 357.15 15252.44 86.84 357.17 15282.69 86.98 357.54 15313.47 87.32 358.34 bt11;i4/.(i1 N /U.:i/144ti42 W 14y.:i;itStS(i4:3:i 581348.79 N 70.37153606 W 149.33885186 581349.43 N 70.37162382 W 149.33884390 581350.00 N 70.37170790 W 149.33883650 581350.44 N 70.37179461 W 149.33883014 581350.55 N 70.37188146 W 149.33882643 581350.70 N 70.37196449 W 149.33882254 581351.02 N 70.37204985 W 149.33881717 581350.82 N 70.37213543 W 149.33881598 581350.22 N 70.37221925 W 149.33881816 581349.37 N 70.37230468 W 149.338 581347.95 N 70.37239044 W 149.33 581346.01 N 70.37247534 W 149.338 581343.59 N 70.37255973 W 149.33886106 581340.87 N 70.37264372 W 149.33888045 581338.25 N 70.37272439 W 149.33889913 581335.04 N 70.37281315 W 149.33892234 581331.78 N 70.37289890 W 149.33894612 581328.90 N 70.37298202 W 149.33896683 581326.06 N 70.37306670 W 149.33898718 581323.53 N 70.37315376 W 149.33900487 581321.49 N 70.37323556 W 149.33901887 581319.17 N 70.37332158 W 149.33903489 581316.78 N 70.37340879 W 149.33905156 581314.32 N 70.37349335 W 149.33906881 581311.55 N 70.37357966 W 149.33908851 581308.88 N 70.37366425 W 149.33910749 581306.59 N 70.37374771 W 149.33912338 581304.30 N 70.37383341 W 149.33 581301.86 N 70.37391812 W 149.33 581299.36 N 70.37400163 W 149.33917398 581296.65 N 70.37408845 W 149.33919321 581294.08 N 70.37417266 W 149.33921136 8836.07 8912 .37 9020. 27 9339.95 9020.50 8864.97 -1667.85 5.42 5986907. 85 581291. 83 N 70.37425793 W 149.33922693 8838.23 8914 .53 9051. 66 9371.60 9051.86 8896.58 -1669.40 0.85 5986939. 45 581289. 92 N 70.37434430 W 149.33923962 8840.29 8916 .59 9082. 34 9402.54 9082.51 8927.49 -1670.90 1.16 5986970. 33 581288 .08 N 70.37442873 W 149.33925183 8842.15 8918 .45 9112 .89 9433.37 9113.04 8958.28 -1672.31 1.76 5987001. 10 581286 .32 N 70.37451285 W 149.33926340 8843.90 8920 .20 9143 .98 9464.73 9144.10 8989.61 -1673.76 1.38 5987032. 41 581284. 53 N 70.37459843 W 149.33927522 8845.58 8921 .88 9174. 50 9495.51 9174.61 9020.36 -1675.29 0.15 5987063. 14 581282. 66 N 70.37468243 W 149.33928767 8847.22 8923 .52 9204. 44 9525.72 9204.53 9050.53 -1676.68 1.31 5987093. 29 581280. 94 N 70.37476486 W 149.33929906 8848.75 8925 .05 9234 .87 9556.46 9234.94 9081.25 -1677.79 2.82 5987123. 99 581279 .49 N 70.37484879 W 149,33930809 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-51\L-51\L-51\L-51 Generated 7/26/2006 10:10 AM Page 7 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft h ft de 00 ft ftUS ftUS lb:i44.(il tl/.:iy 3btS.1/ M2i5U.1t3 Sy1Ei.4i5 y2FiS.(i4 yStS/.5/ yltib.(i9 yllL.:i4 -1(i/ti./3 U.Sy 5yti/155. U/ btS11/t3.1U N /U.:3/4y:i:i/:i W 14y.3:iy:i1b2S5 15375.32 87.67 358.51 8851.51 8927.81 9295.97 9618.25 9296.01 9143.01 -1679.62 1.43 5987185. 72 581276.97 N 70.37501751 W 149.33932313 15406.63 87.63 358.49 8852.79 8929.09 9326.89 9649.53 9326.92 9174.28 -1680.44 0.14 5987216 .98 581275.81 N 70.37510294 W 149.33932984 15438.06 87.87 358.99 8854.02 8930.32 9357.91 9680.94 9357.93 9205.68 -1681.13 1.76 5987248 .37 581274.77 N 70.37518872 W 149.33933551 15469.68 88.18 0.02 8855.11 8931.41 9389.06 9712.54 9389.06 9237.28 -1681.40 3.40 5987279. 96 581274.14 N 70.37527505 W 149.33933779 15501.39 88.59 0.19 8856.01 8932.31 9420.24 9744.24 9420.24 9268.98 -1681.35 1.40 5987311. 65 581273.85 N 70.37536164 W 149.33933737 15532.44 89.01 0.27 8856.66 8932.96 9450.76 9775.28 9450.76 9300.02 -1681.22 1.38 5987342. 69 581273.63 N 70.37544645 W 149.33933642 15561.86 88.94 359.82 8857.18 8933.48 9479.70 9804.70 9479.71 9329.44 -1681.20 1.55 5987372. 10 581273.33 N 70.37552681 W 149.33933628 15593.69 88.87 358.92 8857.79 8934.09 9511.08 9836.52 9511.09 9361.26 -1681.55 2.84 5987403. 92 581272.63 N 70.37561374 W 149.33933918 Last MWD+IFR+MS 15625.76 89.01 359.12 8858.39 8934.69 9542.73 9868.58 9542.74 9393.32 -1682.10 0.76 5987435. 97 581271.72 N 70.37570132 W 149.33934370 TD (Projected) 15683.00 89.01 359.12 8859.37 8935.67 9599.19 9925.82 9599.23 9450.54 -1682.98 0.00 5987493. 17 581270.21 N 70.37585766 W 149.33 Survey Type: Definitive Survey 9 NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gy ro orientation surveys. Not to be run above 70 degrees inclination. ) MWD +IFR + MS - (In-field referenced MWD with mull-stat ion analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Descriation: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 2342 FSL 3860 FEL S34 T12N R11 E UM 5978062.75 583057.66 BHL : 1233 FSL 244 FEL S21 T12N R11 E UM 5987493.17 581270.21 • SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-51\L-51\L-51\L-51 Generated 7/26/2006 10:10 AM Page 8 of 8 ' TREE = 4-1/16" 5K CIW --~-- WELLHEAD= FMC ACTUATOR = KB. ELEV = LEO ___ 76.4 BF. ELEV = 47.9 KOP - Max Angle = 2600' 94° @ 11297 Datum MD = xxxxx' Datum TVD = xxxxx' ~~ 9-5/8" CSG, 40#, L-80, ID= 8.835" ~ ~ L -51 SA OTES: ~~dM D~~ '° [3'ZA,FT 3.5" L-80, 9.2 IbJft, IBT-M Tubing, ID= 2.992" ~~ 10178' Minimum I= 2.813" 21313' HES x N~PPL 9-5/8" HOWCO CEMENTER, ID= 6.276" 7116' 4.5" WLEG, ID= 3.95s" ~ 10178' 10107' I Baker Premier Packer, 7" x 3-112" 10133' 3-112" X Nipple (2.813" ID) w/RHC-m Plug 10154' 3-1/2" X Nipple (2.813" ID) ~ 7" x 5" ZXP Liner Top Pkr wl 11' Tieback ~ 7" CSG, 26#, L-80, .0383 bpf, ID=6.276" 10348' SLOTTED LINER SUMMARY REF LOG: SWS'ViSK~N' LOG 0612612006 ANGLE AT TOP SLOT: 75° Note: Refer to Prc~d~_~rtic~n DB for historical r}erf data SIZE SPF INTERVAL dpnlStlz DATE 3.5" SLOT 10392 - 15650 OPEN 711/2006 2130' ~-I3-1 /2" HES X Nioole . ID= 2.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 8 2183 2180 0 KBG-2 DMY INT 0 06180106 7 3631 3592 30 KBG-2 DCK iNr 06130/06 6 4735 4474 39 KBG-2 DMY iNT 0 06/30/06 5 5744 5280 36 KBG-2 DMY iNT 0 06t30t06 4 6747 6076 37 KBG-2 DMY (NT 0 06!30106 3 7774 6888 37 KBG-2 DMY INT 0 06130106 2 8770 7677 38 KBG-2 DMY INT 0 06130(06 1 10009 8557 52 KBG-2 DMY INT 0 06!30/06 10035' (--IHES Symhony Plus Gauge Carrier 10086' 3-1 /2" X Nipple (2.813" ID) I I I i 13131' TAM Swell Packer 14232' TAM Swell Packer .` ,`~ ,`~ ,`\ 15681' DATE REV BY COMMENTS DATE REV BY COMMENTS 07/01/06 9ES As built PRUDHOE BAY UNIT WELL: L-51 PERMIT No: 206-059 API No: 50-029-23309-00 SEC 34, T12N, R11E, 2343' FSL & 3859' FEL BP Exploration (Alaska) 07/19/06 Scd~~erg~ NO. 3880 Alaska Data 8 Consulting Services Company: State of Alaska 2525 Gambeil Street, Suite a00 1,,~ Alaska Oil 8 Gas Cons Comm Anchorage, AK 99503-2838 y~~~,"~! = s C-~ Attn: Christine Mahnken ATTN: Beth ~ .~ 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Well Job # Log Description Date BL Color CD 15-12A 2 2 V A / 0 1 7 12115 9 J IL 06/24 06 1 P2-11A 11221564 JEWELRY/STATIC SURVEY 04/27/06 1 13-06A 11217266 INJECTION PROFILE 07/12106 1 P2-01 11223106 STATIC PRESSURE/JEWELRY 03/25/06 1 L5-08 11217256 PROD PROFILE W/GHOST 8: DEFT 06/06/06 1 16-04A 11217245 PROD PROFILE W/DEFT 05/08/06 1 05-40 11223123 LDL 07/07/06 1 17-09 11211412 PROD PROFILE W/DEFT & GHOST 06/26!06 1 MPC-07 N/A SENSA/MEMORY GLS 04/22/06 1 04-18 1121584 USIT 06/27/06 1 L-51 11212873 USIT 06/28/06 1 04-31 11217264 USIT 07!07/06 1 D-14A 11217265 USIT 07/09/06 1 PSt-07 10703937 MDT 10/13/03 1 02-166 11209601 MCNL 04/25/06 1 1 L2.18A 11217234 MCNL 04/O6/O6 1 1 L5-09 11212847 MCNL 04/25/06 1 1 Z-26A 11216205 MCNL 07/05!06 1 1 12-01 11072866 RST 07/06/05 1 1 E-17A 10928602 MCNL (Prints sent 1/24105) 10!30/04 1 Alaska Data & Consulting Services Petrotechnical Data Center LR2-1 2525 Gambeil Street, Suite aoo 900 E. Benson Blvd. Anchorage, AK 99503-2838 Anchorage, Alaska 99508 ATTN: Beth C7 • Re: L.-51 cementing • Zug-oS~t • ubject: Re: L-51 cementing Prom: Winton Aubert <wnton_aubert@admin.state.ak.us> Date: Thu, 29 Jun 2006 14:38:53 -0800 To: "Kalstad, Scott R" <Scotf.Kolstad@bp:com> Scott, rOc;CC hereby approves remedial cementing operations for weN PBU L-51 (PTD 206-059), as described below. All other permit stipulations apply. Winton Aubert AOGCC 793-1231 Kolstad, Scott R wrote Winton, As discussed, for well L-51 the primary cement job for the 7" intermediate casing string was performed in 2 stages with losses during the entire cement job. From a USIT -og we determined the TOC to be 5,400'. The planned TnG to satisfy the AOGCC 20 AAC 25.030 d.5 regulation was 3,500' (this is 500' above the sl-;a.liowist hydrocarbon zone, the Ma formation). The log shows cement channeling up to 2,800' and it may € got be possible to pump cement below 2,800'. In an attempt to gain cement isolation between the Ma and surface we are planning an OA down squeeze consisting of 25 bbls of 15.8 ppg class G cement. This volume may be adjusted based on infectivity ability. `~`Je request approval for this to satisfy the regulation noted above. There is currently one Kuparuk injector w/i 1/4 mile of L-51, L-115. L-51 cement job did achieve isolation above and below the Kuparuk reservoir. ~:,r the Schrader 131uff interval, there are currently no wells injecting w/i 1/4 mile of the L-51 penetration. rteyart~s, ~^cat H:olstad 1 of 1 6/29/2006 2:39 PM } ~ ~ ~,~ { ~ ~ i ~ ~ ~~ ~ ~ ' 1 ~ ~ \~ ~ ~ ~ ~~ ~, , , ~ ~ ! ~ , 1 , ; ~ FRANK H. MURKOWSKI, GOVERNOR J I 7 ~~ ~ ~+g Di/0-70~ OiJI! ~ ~ ~ 333 W. 7TM AVENUE, SUITE 100 ~+ CO1~5ER~ATIO1~ CO1rIIrIISSIOI~T ~ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 27&7542 Dave Wesley Senior Drilling Engineer BP Exploration (Alaska) Inc. PO Box 1966.12 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU L-51 BP Exploration (Alaska) Inc. Permit No: 206-059 Surface Location: 2343' FSL, 3859' FEL, SEC. 34, T12N, R11E, UM Bottomhole Location: 1230' FSL, 270' FEL, SEC. 21, T12N, R11E, UM Dear Mr. Wesley: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 6~-3607 (pager). DATED this day of May, 2006 cc: Department of Fish 8v Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALA~OIL AND GAS CONSERVATION COMMON PERMIT TO DRILL 20 AAC 25.005 4JGh- 5/~~ Zoo ~ (. ` ~ ., , _j '~'" ~ ~~ 1 a. Type of work 1 b. Current Well Class p Exploratory p Development Gas 1 c. Spe a~ E is=,propo$~d foE;; : ~~.; ® Drill ^Redrill ^ Service ~ ^ Multiple Zone ^ Coalbed Methane Q Gas. Hydrates ^ Re-Entry ^ Stratigraphic Test ®Development Oil ^ Single Zone ~ Shale Gas - 2. Operator Name: 5. Bond: ®Blanket ^ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU L-51 ~ 3. Address: 6. Proposed Depth: 12. Field /Pool(s): P.O. Box 196612, Anchorage, Alaska 99519-6612 MD 15686 TVD 8896 Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): 7. Property Designation: Pool Surface: ADL 047447 2343' FSL 3859' FEL R11E SEC. 34 T12N LIM(ASStaked) , , , , , Top of Productive Horizon: 8. Land Use Permit: 13. Approximate ud;Date: 1211' FSL, 196' FEL, SEC. 28, T12N, R11 E, UM Ma ,15 006 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 1230' FSL, 270' FEL, SEC. 21, T12N, R11 E, UM 2560 9400' 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation Plan 15. Distance to Nearest well Within Pool: Surface: x-583058 y-5978063 Zone-ASP4 (Height above GL): 76.4 feet 5650 16. Deviated Wells: Kickoff Depth: 2778 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 94 de rees Downhole: 4135 Surface: 3271 18. Casin Pro ram: S ecifications To - Settin Depth -Bottom Quanti of Cement, c.f. or sacks Hole Casin Wei ht Grade ou lin Len th MD TVD MD TVD includin sta a data 42" 20" 91.5# H-40 Weld 80' Surface Surface 110' 110' 260 sx Arctic Set A rox. 12-1/4" 9-5/8" 40# L-80 BTC 2599' Surface Surface 2599' 2596' 465 sx AS Lite, 207 sx Class 'G' 8-3/4" 7" 26# L-80 7CII /BTC-M 10343' Surface Surface 10343' 8716' 321 sx LiteCrete, 183 sx'G', 178 sx LiteCrete / 6-1/8" 3-1/2" 9.3# L-80 IBT 5386' 48366'' 8542' 15686' 8896' Uncemented Slotted Liner la ZZo' W6~{-" 1'9. PRESENT WELL CONDITION SUMMARY (To be com~rieted for Redrill and Re-entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft) Junk (measured): :Casing Length Size Cement Volume MD TVD Conductor /Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ®Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ® Property Plat p Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Scott Kolstad, 564-5347 Printed Name Dave Wesley Title Senior Drilling Engineer Prepared By Name/Number: Si natur ,e.~f ~ ,[~ sue- Phone 564-5153 Date L/ ~ ~*~,, Terrie Hubble, 564-4628 Commission Use Only Permit To Drill API Number: Permit A proval See cover letter for Number: ,Z8 .- (j 50- d Z - Z. 3 O Date: other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales Samples Req'd: ^ Yes ~No Mud Log Req'd: ^ Yes ~, No LL ->- /I HZS Measures: Yes ^ No Directional Survey Req'd: Yes ^ No ~ SST- ~o I t T~ ~SDD S t~ . Oth er: I ~.~,, 20 ~-c. is . 0 3 S C ~ ~ C t) ~ ~,1~-~-~,~,f ~ I~ PE fes t v~ .due 's p~ ~e d . ~~~, ~~~ ~ ~ ~, APPROVED BY THE COMMISSIO °~ ~~D6 D MMI ~ ~ ~ ~ SSIONER ate ,CO Form 10-401. Revised 12/2005 Submit In Duplicate Variance Request Issue Compliance with AOGCC testing requirements for BOP rams after they have been used in the normal coarse of operations. Re uest The AOGCC is in the process of developing a guideline document clarifing the intent of the regulations pertaining to function pressure testing ram type BOP's. BPXA requests a variance #o the provisions of 20 AAC 25.035 (e)(10}C regarding the function pressure test requirement after the use of BOP ram type equipment for other than well control or equivalent purposes, except when the routine use of BOP ram type equipment may have compromised their effectiveness. (Example would be when pipe rams are inadverten#ly closed on a tool joint during routine operations.} The activities associated with this request will not compromise the integrity of the BOP equipment. Background AOGCC regulations require rams that have been used in the course of primary drilling & completion, workover and through tubing drilling operations be function pressure tested before the next wellbore entry. This is not a new regulation. The intent of this regulation is to ensure that ram type equipment has integrity after i# has been utilized in a wellbore...for example; to ensure integrity if a ram was closed on a tool joint. The exact reguiatian language is: "if BOP sealing ram type equipment has been used, it must be function pressure-tested, before the next wellbore entry, to the required working pressure specified in the approved Permit #o Drill, using anon-compressible fluid, except that an annular type preventer need not be tested to more than 50 percent of its rated working pressure;" The pertinent sections are: 20 AAC 25.035 (e)(10)C PRIMARY DRILLING AND COMPLETION; 20 AAC 25.036 (d}(4) THROUGH TUBING DRILLING AND COMPLETION; 20 AAC 25.285 (f)(2} TUBING WORKOVERS• 20 AAC 25.286(e){1) WORKSTRING SERVICE OPERATIONS This issue has been discussed with Winton Aubert at the AOGCC. The test requirement in the regulation is intended to apply to ram tyt~e eauipment only. The AOGCC understands that ram type BOP's are utilized for purposes other than well control in the normal coarse of operations. The regulations allowing a variance are at 20 AAC 25.035(h) PRIMARY DRILLING AND COMPLETION; 20 AAC 25.036{f) THROUGH TUBING DRILLING AND COMPLETION; 20 AAC 25.285(h} TUBING WORKOVERS; 20 AAC 25.286(g} WORKSTRING SERVICE OPERATIONS...which says generally: 20 AAC 25.035(h)... Upon request of the operator, the commission will, in its discretion, approve a variance (1) from the ROPE requirements in (e) of this section if the variance provides at least an equally effective means of well control; • • Well Name: L-51 Drill and Complete Plan Summary T e of Well service / roducer / in'ector : Producer Surface Location: X = 583,057.9' Y = 5,978,062.76' As-Staked 2342.5' FSL, 1420.6' FWL ,Sec. 34, T12N, R11 E Target Locations: X = 581,387' Y = 5,982,192' TO Sa River: 1210.7' FSL, 196.5' FEL ,Sec. 28, T12N, R11 E Bottom Hole Location: X = 581,245' Y = 5,987,490' 1230.4' FSL, 269.5' FEL ,Sec. 21, T12N, R11 E ~' AFE Number: PBDxxx Ri Nabors 7ES - Estimated Start Date: 5/15/06 MD: 15,686' TVD: 8,896' O eratin da s to com lete: 29 RT/GL: 28.5' RKB: 76.4'; Well Design Conventional, slimhole, etc.): Ultra Slimhole Horizontal ~ ,~ Ob'ective: Producer in the Sa River formation. Directional: Ver. Anadrill P6 KOP: 2778' Maximum Hole An le: 94.0 deg at 10,522' MD Close Approach Wells: All wells pass major risk criteria. The nearest well is: L-114 - 16' ctr-ctr ~ 540' None IFR-MS corrected surve s will be used for surve validation. Distance to Nearest Property 9,400' to the Southwest Line: Logging Program: Surface Drilling: MWD / GR Open Hole: None Cased Hole: None Intermediate Hole Drilling: MWD/GR/RES/PWD Open Hole: None Cased Hole: Production Hole Drilling: MWD/GR/RES/DEN/NEU/PERISCOPE Open Hole: None Cased Hole: L-51 Permit application Page 1 • Mud Program: 12 ~/a" Surface Hole (0-2.599'): • Fresh Water Surface Hole Mud Density Viscosity seconds Yield Point Ib/1~_ API FL mis/30min PH Initial 8.5 - 9.2 250-300 50 - 70 15 - 20 8.5 - 9.5 Base PF to to SV 9.0 - 9.5 250-300 30 - 45 < 10 ~ 8.5 - 9.5 SV toTD 9.5 max 250-300 20 - 40 < 10 8.5 - 9.5 8 3/a "Intermediate Hole (2.599' -10.343'1: LSND Interval Density Tau o YP PV pH API 10' Gel (ppg) Filtrate Upper 9.5 4-7 25-30 10-15 8.5-9.5 6-10 10 Interval Top of HRZ 1 3-7 20-25 10-15 8.5-9.5 4-6 10 to TD 6 1/8" Production Hole (10.343' - TD'1: FloProNT Interval Density YP PV LSRV HTHP FL pH To TD 9.6 20 - 24 10 - 20 20 - 30K 4-6 9 Hydrau ics: Surface Hole: 12-1/4" Interval Pump GPM Drill Pie AV (fpm) Pump PSI ECD ppg-emw Motor Jet ("/32) Nozzles TFA (in2) 0-1760' 550 4" 15.7# 90 1800 10.0 N/A 18,18,18,16 .942 1760'-2599' 650 4" 15.7# 110 2400 10.2 N/A 18,18,18,16 .942 Intermediate Hole: 8 3/a" Interval Pump Drill Pipe AV Pump PSI ECD Motor Jet Nozzles TFA GPM (fpm) ppg-emw ("/32) (in2) 2599' - 600 4" 15.7# 240 3400 13.0 N/A 3x14, 3x15 .969 10,343' Production Hole: 6-1/8" Interval Pump GPM Drill Pipe AV (fpm) Pump PSI ECD ppg-emw Motor Jet ("/32) Nozzles TFA (in2} 10,343' - TD' 285 4" 15.7# 250 3400 11.2 N/A 6x11 .552 L-51 Permit application Page 2 • • Casing/Tubing Program: Hole Size Csg/ Tb O.D. Wt/~ Grade ~ Conn ~ Length Top MD/TVD Btm MD/TVD bkb 42" Insulated 20" 91.5# H-40 WLD 80' GL 110'/110' 12 ~/a" 9 5/8" 40# L-80 BTC 2599' G L 2599' / 2596' 8 3/a" 7" 26# L-80 TC-II 4000' GL 4,000`/ 3910' 8 3/a" 7" 26# L-80 BTC-m 6343' 4000' / 3910' 10343' / 8716' 6 1 /8" 3 '/2" 9.3# L-80 I BT 5386' 10300'/8698' 15686' / 8896' Tubin 3'h" 9.3# L-80 IBT-M 10300' GL 10300' / 8698' Integrity Testing: Test Point Depth Test Type EMW Surface Casing Shoe 20' - 50' from surface shoe LOT Expected >13.5 Intermediate Casing Shoe 20' - 50' from intermediate FIT 11.5 ppg shoe Cement Calculations: The following surface cement calculations are based upon a single stage job using a port collar as a contin enc if cement is not circulated to surface. Casing Size 9-5/8" Surface, String Basis: Lead: Based on conductor set at 110', 1650' of annulus in the permafrost @ 250% excess and 341' of open hole from top of tail slurry to base permafrost @ 30% excess. Lead TOC: To surface Tail: Based on 500' TVD above the casing shoe + 30% excess + 80' shoe track volume. Tail TOC: At 2099' MD -; Total Cement Volume: Lead 343 bbl / 2066 ft / sks of Schlumberger Arctic SET Lite 10.7 and Tail 42 bbl / 238 ft /~ 15.8 ppCl and 11 ~ cf/sk. ks of Schlumberger Neat "G" at cf/sk. Intermediate Casing: A two stage cement job is required to cement the intermediate casing. The tail TOC will be 1000' MD above the 7" casing shoe, and the second stage cement top will be 500' MD above the top of the Ma sands. Casing Size 7" Intermediate String -Two Sta e Basis: Stage 1: lead TOC at 5,464' MD (100' MD below the top of the CM2), tail to 1000' above shoe + 30% excess + 80' shoe Sta e2: ES Cementer at 5,464' MD, TOC at 50 MD (500' above Ma sands) + 30% excess Total Cement Volume: Lead: 135 bbl / ft / 321 sks of Schlumberger Lite Crete 12.5 ppg Stage 1 and 2.36 cf/sk. Tail: 37.9 bbl/212.6 ft3./ 183. sks of class "G" cement 15.8 and 1.16 cf/sk Total Cement Volume: Lead: 74.7 bbl / 419.4 ft3 / 17 sks of Schlumberger Lite Crete Stage 2 12.5 ppg and 2.36 cf/sk. - L-51 Permit application Page 3 • • Casin Size 3 ~/z" Production Liner -Slotted L-51 Permit application Page 4 • • Formation To s(TVDss) and Estimated Pore Pressures Est. Formation To s Uncertain Commercial Hydrocarbon Bearin Est. Pore Press. Est. Pore Press. Formation (TVDss) (eet) (Yes/No) (Psi) ( EMW) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells G1 -260 +/-30' 117 8.7 SV6 -890 +/-30' 401 8.7 SV5 -1545 +/-30' 695 8.7 SV4 -1680 +/-30' Poss. Gas H dr. 756 8.7 Base-Permafrost -1680 +/-30' 756 8.7 Fault 1 -1900 +/-100' M.D. - see fault section below 855 8.7 SV3 -1935 +/-30' Poss. Gas H dr. 871 8.7 $V2 -2100 +/-30' Poss. Gas H dr. 945 8.7 SVl -2420 +/-30' Poss. Gas H dr. 1089 8.7 UG4 -2700 +/-30' No -Coal 1215 8.7 UG4A -2740 +/-30' Heavy Oil: 2740 - 2810' SS 1260 8.8 UG3 -3070. +/-30' No 1390 8.7 UG1 -3540 +/-30' Heavy Oil: 3685' - 3855' ss 1593 8.7 Ma -3855 +/-30' Yes - Heav Oil 1735 8.7 Mb1 -3895 +/-30' Heavy 0113895' - 3940' SS 1753 8.7 Mb2 -3960 +/-30' :Heavy 0113895' - 3940' SS 1782 8.7 Mc -4065 +/-30' :Heavy Oil: 4065' - 4.100' SS 1829 8.7 Na -4110 +/-30' No 1850 8.7 Nb -4140 +/-30' Yes 1863 8.7 Nc -4175 +/-30' Yes 1879 8.7 OA -4265 +/-30' Yes 1898 8.6 OBa -4330 +/-30' Yes 1927 8.6 OBb -4375 +/-30' Yes 1947 8.6 OBC -4425 +/-30' Yes 1969 8.6 OBd -4475 +/-30' Yes 1991 8.6 OBe -4555 +/-30' Yes 2027 8.6 OBf -4585 +/-30' Yes 2040 8.6 Fault 2 -4590 +/-100' M.D. - see fault section below OBf_Base -4595 +/-30' No 2045 8.6 CM-2 -4910 +/-30' n/a jo L-51 Permit application Page 5 i • GM-1 -5545 +/-30' n/a Fault 3 =5670 THRZ -6065 +/-30' n/a TKLB -6265 K-1 -6325 +/-30' No; TKD -6405 +/-30' No TKC4 -6425 +/-30' Yes 3200 9.6 TKC1 A -6525 TKB/LCU -6540 +/-30' n/a TKA6 -6700 TMLV -6840 +/-30' n/a TKNG -7590 +/-30' n/a TJF -7690 +/-30' n/a Fault 4 -7700 TJE -7975 +/-30' TJD -8080 +/-30' TJC -8280 +/-30' .Fault 5 -8390 TJB absent- faulted +/-30' n/a TJA -8530 +/-30' TSGR -8640 +/-20' Yes 413'5 9.2 Fault 6 - horiz section -8670 fault 7 - horiz section -8700 Fault 8 - horiz section -8740 Fault 9 -'horiz section -8780 Formation tops below target interval: TSHA -8685 +/-30' TSHB -8770 +/-30' TSHC -8785 +/-30' TSHD -8815 +/-30' TEIL -8830 +/-30' TSAD -8870 +/-30' Well TD Criteria (ie ??ft TVD, ??ft Rathole, etc.) Drill per well plan, do not exceed planned TD, approx. 5300' horizontal footage. Minimum horizontal footage for success case is approx. 3700'. Well may be TD'ed early if structural dip is lower than expected in last 1500' of well. 1. Well L-50 11/12/05 static pressure survey indicated 3842 psi, 224 F at 8500TVDss 2. Estimated Sag River pressure of 4135 psi based on 9/98 NW Eileen #2-01 RFT data indicating 4135 psi, 207 F at 8640 MD. ~•~ L-51 Permit application Page 6 • • Well Control: Surface hole will be drilled with diverter. The intermediate an oduction hole well control equipment consisting of 5000 psi working pressure pipe ra s( ,blind/shear rams, and annular preventer will be installed and is capable of handling maxim~r~otential surface pressures. BOP equipment will be tested to 3500 psi. The BOP test frequency will be conducted on ~.., a 14 day frequency, with a function test every 7 days. Except for significant operational issues that may effect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate Interval- Maximum anticipated BHP: Maximum surface pressure: Production Interval- 3200 psi C 6501' TVD - Kuparuk River Sand 2550 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) • Maximum anticipated BHP: 41 psi @ 8640' TVD -Sag. River Sand • Maximum surface pressure: 2 psi @ surface _sed on BHP and a full column of gas from TD @ 0.10 psi/ft) • Planned BOP test pressure: 3500 psi • Planned completion fluid: 9.6 ppg brine / 6.8 ppg diesel (2,200' TVD) Disposal: • No annular disposal in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS- 04 for disposal. Haul all Class I wastes to Pad 3 for disposal. L-51 Permit application Page 7 • • DRILL AND COMPLETE PROCEDURE SUMMARY Pre-Rig Work: The 20" insulated conductor is installed. 1. Weld an FMC landing ring for the FMC Ultra slimhole wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. Rig Operations: 1. MIRU Nabors 7ES. /` 2. Nipple up and function test diverter. PU 4" DP as required and stand back in derrick. 3. MU 12'/a" drilling assembly with MWD/GR/Dir and drill surface hole to approximately 100' TVD below the SV1 Sand top. 4. Run and cement the 9-5/8", 40# surface casing back to surface. 5. ND diverter and NU casing /tubing head. NU BOPE and test. 6. MU 8-3/4" drilling assembly with MWD/GR/DIR/RES/PWD and RIH to float collar. Test the 9-5/8" casing to 3500 psi for 30 minutes. 7. Drill out shoe joints and displace well to LSND drilling fluid. Drill 20' - 50' of new formation and perform Leak Off Test. 8. Drill to +/-100' above the HRZ, ensure mud is in condition and up to required weight and perform short trips as needed. Ensure Pre-Reservoir meeting is held highlighting kick tolerance and detection prior to entering the Kuparuk. 9. Drill ahead to TD at the top of the Sag River. 10. Condition hole for running 7" 26# intermediate casing. 11. Run and cement the 7" intermediate casing. Displace the cement with drilling mud.,: 12. MU 6-1l8" cleanout drilling assembly. RIH and drill out ES cementer. RIH to float collar Test the 7" casing to 3500 psi for 30 minutes. Drill out the float collar, and shoe track (nof the#loat shoe). 13. Displace the well to drilling fluid. POOH. 14. MU 6-1/8" build drilling assembly. RIH to float shoe. Drill out float shoe. 15. Drill 20' - 50' of new formation and perform Formation Integrity Test. Drill the build section of 25°/100' DLS. ,i 16. MU 6-1/8" drilling assembly with MWD/GR/DIR/RES/DEN/NEU w/ Periscope. / 17. Drill horizontally to TD with the assistance of the on-site Geologist: 18. Run 3'/z", L-80, slotted liner with liner hanger and packer. / 19. Freeze protect the 7" x 9-5/8" annulus as required. Record formation breakdown pressure on the Morning Report. 20. Run the 3-1/2", 9.3#, L-80, IBT-M completion assembly. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes. Shear the GLM shear valve and install TWC. Test below to 1000 psi. 21. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Remove TWC. 22. RU hot oil truck and freeze protect well to 2,200' TVD with diesel. 23. Rig down and move off. Post-Rig Work• 1. MIRU slickline. Pull the ball and rod / RHC plug. 2. Pull DCR shear valve, install GLV in all of the other mandrels as per the PE. L-51 Permit application Page 8 Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control /Reservoir Pressures: Interval Psi (EMW) TVDss Schrader, OA 1898 (8.6) 4,265 Ku aruk 3,200 (9.6) 6,425 Sa .River 4135 (9.2) 8640 II. Hydrates and Shallow gas: A. Gas Hydrates are expected at L-pad near the base of the permafrost. Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole. Recommended practices for drilling hydrates should be followed in the surface hole. Occasionally hydrates are encountered below the SV1. III. Lost Circulation /Breathing: A. Lost circulation risk is considered moderate to high within the horizontal section and throughout the uphole intervals. B. The Shublik in not planned to be penetrated, but well bore breathing could occur if it is. IV. Kick Tolerance /Integrity Testing: A. The 9 5/a" casing will be cemented to surface. The 7" casing will be cemented to 500' MD above the Ma sand. B. Integrity Testing: NOTE: If the LOT /FIT is less then the minimum notify the ODE immediately Kick Tolerance / Inte ri Testin Summa Table Casin /Interval Maximum Influx Volume Mud Wei ht Ex Pore Press Min LOTI FIT Surface / 8-3/a" 41 10.4 9.6 Ku aruk 12.5 LOT Intermediate / 6- Infinite 9.6 9.2 (Sag. River) 11.5 (FIT) 1/8" NOTE: All LOT /FIT will be taken with a minimum of 20-ft and a maximum of 50-ft of new hole drilled outside of the previous casing string L-Pad development wells may have "kick tolerances" in th 25 I range. A heightened awareness of kick detection, pre-job planning and trip tank c ' ~ ation will be essential while drillin tri in the intermediate/ roduction intervals. V. Stuck Pipe A. There could be differential sticking across the Schrader Bluff while running the 7" casing. Keep the casing moving as much as possible and follow the centralizer program to help with standoff. VI. Hydrogen Sulfide A. L Pad is nQ,designated as an HZS site, however Standard Operating Procedures for HZS precautions should be followed at all times. No measurable HZS is being produced from the formation at this time. However 10 ppm is measured regularly at L pad as a result of the use of Ivishak gas lift gas. All L pad gas lift wells will likely have HZS in this concentration. Note that all injection has been with produced water not seawater. HZS levels are expected to remain low until the water flood matures. [IZS Summan~ Table ~~~ell Name II2S Level Date of Readin~~ #1 Closest SHL Well H2S Level L-114 15 m 11/2005 #2 Closest SHL Well H2S Level L-50 5 m 11/2005 L-51 Permit application Page 9 • i VII. Faults Fault Location 1~iD TVDss Throw Uncertainty Fault #1 - SVS Z Pad' Fault 1,878 -1800 95 +/- 100' MD Fault #2 -Lower Schrader Bluff (OBf) 4960 -4590 40 +/- 100' MD Fault #3 -Below CM-1 6330 -5670 130 +/- 100' MD Fault #4 -Kin ak TJF 8910 -7700 40 +/- 100' MD Fault #5 -Kin ak TJB 9880 -8390 80 +/- 100' MD Fault #6 - Sa River 11100 -8680 20 +/- 100' MD Fault #7 - Sa River 11700 -8715 25 +/- 100' MD Fault #8 - Sa River 13200 -8750 25 +/- 100' MD Fault #9 - Sa River 14200 -8775 20 +/- 100' MD CONSULT THE L PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION L-51 Permit application Page 10 k1~7 L-51 (P6) Proposal Report Date: Mamh 21, 2006 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 349.750° Field: Prudhoe Bay Unit - WOA Structure 1 Slot: L-PAD / S-B Vertical Section Origin: N 0.000 ft, E 0.000 ft TVD Reference Datum: Rotary Table ~ Well: Plan L-51 (S-B) ~~~~~ Borehole: Plan L-51 ~~ ~~ TVD Reference Elevation: 76.40 ft relative to MSL Sea Bed 1 Ground Level Elevation: 47.90 ft relative to MSL UWI/API#: 50029 Magnetic Declination: 24.212° Survey Name 1 Date: L-51 (P6) N /March 20, 2006 Total Field Strength: 57579.155 nT Tort /AHD 1 DDI 1 ERD ratio: 152.301 ° / 9889.09 ft / 6.424 / 1.11 ~ Magnetic Dip: 80.856° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feel Declination Date: June 01, 2006 Location LatlLong: N 70.35004004, W 149.32566972 Magnetic Declination Model: BGGM 2005 Location Grid WE YIX: N 5978062.700 ftUS, E 583057.900 ftUS North Reference: True North Grid Convergence Angle: +0.63506370° Total Corr Mag North a True North: +24.212° Grid Scale Factor. 0.99990784 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth SulrSea TVD TVD Vertical NS EW DLS Tool Face Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section ft d d ft ft ft ft ft de 100 ft de de 100 ft d 100 ft ftUS ftUS Kit V.VV V.VU L`JU.UU -/b.4U U.VV U.UU U.UU V.UU U.VV -/V.UUM V.VV U.UU b`J/tSUbL./U G 1 336.40 0.00 290.00 260.00 336.40 0.00 0.00 0.00 0.00 -70.OOM 0.00 0.00 5978062.70 Ndg 1.5/100 500.00 0.00 290.00 423.60 500.00 0.00 0.00 0.00 0.00 -70.OOM 0.00 0.00 5978062.70 600.00 1.50 290.00 523.59 599.99 0.66 0.45 -1.23 1.50 -70.OOM 1.50 0.00 5978063.13 700.00 3.00 290.00 623.51 699.91 2.64 1.79 -4.92 1.50 -70.OOM 1.50 0.00 5978064.44 End Bld 800.00 4.50 290.00 723.29 799.69 5.93 4.03 -11.06 1.50 -70.OOM 1.50 0.00 5978066.60 SV6 967.22 4.50 290.00 890.00 966.40 12.54 8.51 -23.39 0.00 -70.OOM 0.00 0.00 5978070.95 Drp 1.5/100 1300.00 4.50 290.00 1221.75 1298.15 25.69 17.44 -47.93 0.00 -70.OOM 0.00 0.00 5978079.61 1400.00 3.00 290.00 1321.53 1397.93 28.99 19.68 -54.07 1.50 -70.OOM -1.50 0.00 5978081.78 1500.00 1.50 290.00 1421.45 1497.85 30.97 21.02 -57.76 1.50 -70.OOM -1.50 0.00 5978083.08 End Drp 1600.00 0.00 290.00 1521.44 1597.84 31.63 21.47 -58.99 1.50 -32.36M -1.50 0.00 5978083.51 ', SV5 1623.56 0.00 327.64 1545.00 1621.40 31.63 21.47 -58.99 0.00 -32.36M 0.00 0.00 5978083.51 S V4 /Base Perm 1758.56 0.00 327.64 1680.00 1756.40 31.63 21.47 -58.99 0.00 -32.36M 0.00 0.00 5978083.51 Fault 1 Crossing I 1978.56 0.00 327.64 1900.00 1976.40 31.63 21.47 -58.99 0.00 -32.3fiM 0.00 0.00 5978083.51 II SV3 2013.56 0.00 327.64 1935.00 2011.40 31.63 21.47 -58.99 0.00 -32.36M 0.00 0.00 5978083.51 SV2 2178.56 0.00 327.64 2100.00 2176.40 31.63 21.47 -58.99 0.00 -32.36M 0.00 0.00 5978083.51 SV1 2498.56 0.00 327.64 2420.00 2496.40 31.63 21.47 -58.99 0.00 -32.36M 0.00 0.00 5978083.51 9-5/8" Csg Pt 2598.56 0.00 327.64 2520.00 2596.40 31.63 21.47 -58.99 0.00 -32.36M 0.00 0.00 5978083.51 KOP Crv 1.5!100 2700.00 0.00 327.64 2621.44 2697.84 31.63 21.47 -58.99 0.00 -32.36M 0.00 0.00 5978083.51 UG4 2778.56 1.18 327.64 2700.00 2776.40 32.38 22.15 -59.43 1.50 -32.36M 1.50 0.00 5978084.19 Crv 3/100 2800.00 1.50 327.64 2721.43 2797.83 32.84 22.58 -59.69 1.50 -32.36M 1.50 0.00 5978084.61 UG4A 2818.58 2.06 327.64 2740.00 2816.40 33.37 23.06 -60.00 3.00 -32.36M 3.00 0.00 5978085.10 2900.00 4.50 327.64 2821.28 2897.68 37.69 27.00 -62.50 3.00 -32.36M 3.00 0.00 5978089.00 btS3Ub/.`JU N /V.3DVU4VU4 VV -14`J.3LJbb`J/L 583057.90 N 70.35004004 W 149.32566972 583057.90 N 70.35004004 W 149.32566972 583056.67 N 70.35004127 W 149.32567970 583052.96 N 70.35004493 W 149.32570965 583046.79 N 70.35005105 W 149.32575954 583034.42 N 70.35006330 W 149.32585963 583009.79 N 70.35008770 W 149.32605880 583003.62 N 70.35009381 W 149.32610869 582999.91 N 70.35009748 W 149.32613863 582998.68 N 70.35009870 W 149.32 2 582998.68 N 70.35009870 W 149.32 582998.68 N 70.35009870 W 149.32 2 582998.68 N 70.35009870 W 149.32614862 582998.68 N 70.35009870 W 149.32614862 582998.68 N 70.35009870 W 149.32614862 582998.68 N 70.35009870 W 149.32614862 582998.68 N 70.35009870 W 149.32614862 582998.68 N 70.35009870 W 149.32614862 582998.24 N 70.35010057 W 149.32615213 582997.97 N 70.35010172 W 149.32615431 582997.65 N 70.35010305 W 149.32615681 582995.12 N 70.35011380 W 149.32617705 WeIlDesign Ver SP 1.0 Bld( doc40x_56) S-B\Plan L-51 (S-B)\Plan L-51\L-51 (P6) N Generated 3/21/2006 9:11 AM Page 1 of 4 Comments Measured inclination Azimuth SulrSea TVD TVD Vert~ai NS EW DLS 7001 Face Build Rate Walk Rate Northing Fasting Latitude LongiWde Depth Section ft de d ft ft ft ft ft d 100 ft de de 100 ft d 100 ft ftUS ftUS 3000 .UU /.5U 31/.64 ZyZU ./Z Z9y/.1Z 4/.3/ 3b.t33 -6tf.U9 3.UU U.UUG 3.UU U.UU by/iSUy/.// btSZytSy .4Z N /U .39U13/yZ VV 14y. 316ZZZ46 3100 .00 10.50 327.64 3019 .48 3095.88 61.86 49.04 -76.46 3.00 O.OOG 3.00 0.00 5978110.88 582980 .91 N 70 .35017401 W 149. 32629043 3151. 51 12.05 327.64 3070. 00 3146.40 71.19 57.54 -81.85 3.00 O.OOG 3.00 0.00 5978119.33 582975. 42 N 70. 35019725 W 149. 32633419 3200 .00 13.50 327.64 3117 .28 3193.68 81.12 66.60 -87.59 3.00 O.OOG 3.00 0.00 5978128.32 582969 .59 N 70 .35022198 W 149. 32638077 3300 .00 16.50 327.64 3213 .87 3290.27 105.10 88:46 -101.44 3.00 O.OOG 3.00 0.00 5978150.02 582955 .49 N 70 .35028170 W 149. 32649322 3400 .00 19.50 327.64 3308 .96 3385.36 133.72 114.56 -117.98 3.00 O.OOG 3.00 0.00 5978175.93 582938 .67 N 70 .35035300 W 149. 32662749 3500 .00 22.50 327.64 3402 .31 3478.71 166.92 144.82 -137.16 3.00 O.OOG 3.00 0.00 5978205.98 582919 .15 N 70 .35043568 W 149. 32678319 3600 .00 25.50 327.64 3493 .65 3570.05 204.60 179.18 -158.93 3.00 O.OOG 3.00 0.00 5978240.09 582897 .01 N 70 .35052953 W 149. 32695992 3651. 69 27.05 327.64 3540. 00 3616.40 225.80 198.50 -171.18 3.00 O.OOG 3.00 0.00 5978259.28 582884. 55 N 70. 35058233 W 149. 32705935 3700 .00 28.50 327.64 3582 .74 3659.14 246.65 217.52 -183.23 3.00 O.OOG 3.00 0.00 5978278.15 582872 .29 N 70 .35063428 W 149. 32715718 3800 .00 31.50 327.64 3669 .34 3745.74 292.97 259.75 -209.99 3.00 O.OOG 3.00 0.00 5978320.08 582845 .06 N 70 .35074964 W 149. 32 3900 .00 34.50 327.64 3753 .19 3829.59 343.42 305.75 -239.14 3.00 O.OOG 3.00 0.00 5978365.75 582815 .41 N 70 .35087531 W 149. 32 4000 .00 37.50 327.64 3834 .08 3910.48 397.87 355.39 -270.60 3.00 O.OOG 3.00 0.00 5978415.04 582783 .41 N 70 .35101092 W 149. 32786649 4014 .83 37.94 327.64 3845 .81 3922.21 406.28 363.05 -275.45 3.00 O.OOG 3.00 0.00 5978422.64 582778 .46 N 70 .35103186 W 149. 32790592 4026. 48 37.94 327.64 3855. 00 3931.40 412.91 369.10 -279.29 0.00 O.OOG 0.00 0.00 5978428.65 582774. 56 N 70. 35104839 W 149. 32793705 4077. 20 37.94 327.64 3895. 00 3971.40 441.81 395.45 -295.98 0.00 O.OOG 0.00 0.00 5978454.81 582757. 58 N 70. 35112036 W 149. 32807259 4159. 62 37.94 327.64 3960. 00 4036.40 488.76 438.26 -323.11 0.00 O.OOG 0.00 0.00 5978497.31 582729. 98 N 70. 35123731 W 149. 32829284 4349. 83 37.94 327.64 4110. 00 4186.40 597.12 537.05 -385.72 0.00 O.OOG 0.00 0.00 5978595.40 582666. 29 N 70. 35150720 W 149. 32880114 4387. 88 37.94 327.64 4140. 00 4216.40 618.79 556.81 -398.24 0.00 O.OOG 0.00 0.00 5978615.01 582653. 55 N 70. 35156118 W 149. 32890280 4432. 26 37.94 327.64 4175. 00 4251.40 644.07 579.86 -412.85 0.00 O.OOG 0.00 0.00 5978637.90 582638. 69 N 70. 35162415 W 149. 32902140 4546. 38 37.94 327.64 4265. 00 4341.40 709.09 639.14 -450.41 0.00 O.OOG 0.00 0.00 5978696.75 582600. 48 N 70. 35178608 W 149. 32932639 4628. 81 37.94 327.64 4330. 00 4406.40 756.04 681.95 -477.54 0.00 O.OOG 0.00 0.00 5978739.25 582572. 88 N 70. 35190303 W 149. 32954666 4685. 87 37.94 327.64 4375. 00 4451.40 788.55 711.59 -496.32 0.00 O.OOG 0.00 0.00 5978768.68 582553. 77 N 70. 35198400 W 149. 32969916 4749. 27 37.94 327.64 4425. 00 4501.40 824.67 744.52 -517.19 0.00 O.OOG 0.00 0.00 5978801.37 582532. 54 N 70. 35207396 W 149. 32986860 4812. 68 37.94 327.64 4475. 00 4551.40 860.79 777.45 -538.06 0.00 O.OOG 0.00 0.00 5978834.07 582511. 31 N 70. 35216392 W 149. 33003804 4914. 12 37.94 327.64 4555. 00 4631.40 918.58 830.14 -571.45 0.00 O.OOG 0.00 0.00 5978886.38 582477. 34 N 70. 35230786 W 149. 33030916 4952. 16 37.94 327.64 4585. 00 4661.40 940.25 849.90 -583.97 0.00 O.OOG 0.00 0.00 5978906.00 582464. 60 N 70. 35236183 W 143. 33041083 4958. 50 37.94 327.64 4590. 00 4666.40 943.86 853.19 -586.06 0.00 O.OOG 0.00 0.00 5978909.27 582462. 48 N 70. 35237083 W 149. 33042777 4964. 85 37.94 327.64 4595. 00 4671.40 947.48 856.49 -588.14 0.00 O.OOG 0.00 0.00 5978912.54 582460. 36 N 70. 35237983 W 149. 33 5304 .69 37.94 327.64 4863 .00 4939.40 1141.07 1033.00 -700.00 0.00 93.66G 0.00 0.00 5979087.78 582346 .56 N 70 .35286201 W 149. 33 8 5364. 25 37.87 330.54 4910. 00 4986.40 1175.31 1064.39 -718.79 3.00 91.36G -0.13 4.88 5979118.96 582327. 42 N 70. 35294776 W 149. 3315 559 5400 .00 37.85 332.29 4938 .23 5014.63 1196.13 1083.65 -729.29 3.00 89.98G -0.04 4.89 5979138.10 582316 .71 N 70 .35300039 W 149. 33159082 5495 .57 37.95 336.96 5013 .65 5090.05 1252.77 1136.66 -754.43 3.00 O.OOG 0.10 4.88 5979190.83 582290 .99 N 70 .35314520 W 149. 33179499 6169. 37 37.95 336.96 5545. 00 5621.40 1656.83 1517.95 -916.62 0.00 O.OOG 0.00 0.00 5979570.25 582124. 60 N 70. 35418678 W 149. 33311218 6327. 88 37.95 336.96 5670. 00 5746.40 1751.88 1607.64 -954.77 0.00 O.OOG 0.00 0.00 5979659.51 582085. 46 N 70. 35443181 W 149. 33342207 6828. 78 37.95 336.96 6065. 00 6141.40 2052.25 1891.08 -1075.34 0.00 O.OOG 0.00 0.00 5979941.57 581961. 77 N 70. 35520610 W 149. 33440136 7082. 40 37.95 336.96 6265. 00 6341.40 2204.34 2034.60 -1136.39 0.00 O.OOG 0.00 0.00 5980084.39 581899. 14 N 70. 35559814 W 149. 33489724 7158. 49 37.95 336.96 6325. 00 6401.40 2249.97 2077.65 -1154.70 0.00 O.OOG 0.00 0.00 5980127.23 581880. 35 N 70. 35571576 W 149. 33504600 7259. 94 37.95 336.96 6405. 00 6481.40 2310.80 2135.06 -1179.12 0.00 O.OOG 0.00 0.00 5980184.36 581855. 30 N 70. 35587257 W 149. 33524436 7285. 30 37.95 336.96 6425. 00 6501.40 2326.01 2149.41 -1185.23 0.00 O.OOG 0.00 0.00 5980198.64 581849. 03 N 70. 35591178 W 149. 33529395 7412. 11 37.95 336.96 6525. 00 6601.40 2402.06 2221.17 -1215.75 0.00 O.OOG 0.00 0.00 5980270.05 581817. 72 N 70. 35610780 W 149. 33554190 WeIlDesign Ver SP 1.0 Bld( doc40x_56) S-B\Plan L-51 (S-B)\Plan L-51\L-51 (P6) N Generated 3/21/2006 9:11 AM Page 2 of 4 Measured Vertical Comments Inclination Azimuth Sub-Sea TVD TVD NS EW DLS Tool Face Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section ft d de ft ft ft ft ft d 100 ft d de 100 ft d 100 ft ftUS ftUS IKtl/LGU /4J7. 7J 3/.y0 J30.'J0 004V.VU 0070.40 Z47 J.40 ZY37.'JJ -7 ZZU. JJ U.UU U.UVCi TKA6 7634. 03 37.95 336.96 6700. 00 6776.40 2535.13 2346.74 -1269. 17 0.00 O.OOG TMLV 7811. 56 37.95 336.96 6840. 00 6916.40 2641.59 2447.20 -1311. 90 0.00 O.OOG Crv 4/100 8684 .44 37.95 336.96 7528 .34 7604.74 3165.03 2941.14 -1522 .01 0.00 69.83G 8700 .00 38.17 337.90 7540 .59 7616.99 3174.40 2949.99 -1525 .69 4.00 69.09G Top Kingak 8763. 26 39.13 341.65 7590. 00 7666.40 3213.30 2987.05 -1539. 33 4.00 66.16G 8800 .00 39.74 343.75 7618 .38 7694.78 3236.45 3009.33 -1546 .26 4.00 64.54G TJF 8894. 33 41.48 348.90 7690. 00 7766.40 3297.70 3068.96 -1560. 72 4.00 60.63G 8900 .00 41.59 349.20 7694 .25 7770.65 3301.46 3072.65 -1561 .44 4.00 60.41 G Fault 4 Crossing 8907. 70 41.75 349.60 7700. 00 7776.40 3306.58 3077.68 -1562. 38 4.00 60.10G 9000. 00 43.68 354.23 7767 .83 7844.23 3369.11 3139.64 -1571 .13 4.00 56.70G End Crv 9058 .50 45.00 357.00 7809 .67 7886.07 3409.77 3180.40 -1574 .24 4.00 O.OOG TJE 9292. 31 45.00 357.00 7975. 00 8051.40 3573.77 3345.50 -1582. 90 0.00 O.OOG TJD 9440. 80 45.00 357.00 8080. 00 8156.40 3677.93 3450.36 -1588. 39 0.00 O.OOG TJC 9723. 64 45.00 357.00 8280. 00 8356.40 3876.34 3650.08 -1598. 86 0.00 O.OOG Crv 4/100 9808 .50 45.00 357.00 8340 .00 8416.40 3935.86 3710.00 -1602 .00 0.00 O.OOG Fault 5 Crossing 9881. 08 47.90 357.00 8390. 00 8466.40 3988.04 3762.53 -1604. 75 4.00 O.OOG 9900. 00 48.66 357.00 8402 .59 8478.99 4002.05 3776.63 -1605 .49 4.00 O.OOG 10000 .00 52.66 357.00 8465 .97 8542.37 4078.75 3853.85 -1609 .54 4.00 O.OOG 10100 .00 56.66 357.00 8523 .80 8600.20 4159.66 3935.30 -1613 .81 4.00 O.OOG TJA 10111. 35 57.11 357.00 8530. 00 8606.40 4169.08 3944.79 -1614. 30 4.00 O.OOG 10200 .00 60.66 357.00 8575 .80 8652.20 4244.37 4020.57 -1618 .28 4.00 O.OOG 10300 .00 64.66 357.00 8621 .72 8698.12 4332.47 4109.26 -1622 .92 4.00 O.OOG End Crv 10308 .50 65.00 357.00 8625 .33 8701.73 4340.10 4116.94 -1623 .33 4.00 O.OOG Top Sag River 10343. 17 65.00 357.00 8639. 99 8716.39 4371.27 4148.33 -1624. 97 0.00 O.OOG 10343 .20 65.00 357.00 8640 .00 8716.40 4371.30 4148.35 -1624 .97 0.00 O.OOG 7" Csg Pt 10343. 22 65.00 357.00 8640. 01 8716.41 4371.32 4148.37 -1624. 97 0.00 O.OOG Crv 25/100 10358 .20 65.00 357.00 8646 .34 8722.74 4384.78 4161.92 -1625 .68 0.00 O.OOG 10400 .00 75.45 357.00 8660 .46 8736.86 4423.75 4201.15 -1627 .74 25.00 O.OOG Crv 6/100 10458 .20 90.00 357.00 8667 .81 8744.21 4480.87 4258.65 -1630 .75 25.00 -18.10G 10500 .00 92.38 356.22 8666 .94 8743.34 4522.36 4300.36 -1633 .22 6.00 -18.12G End Crv 10521 .80 93.63 355.81 8665 .80 8742.20 4544.00 4322.09 -1634 .74 6.00 O.OOG Crv 6/100 10579 .67 93.63 355.81 8662 .14 8738.54 4601.43 4379.68 -1638 .95 0.00 -153.42G 10600 .00 92.54 355.27 8661 .05 8737.45 4621.62 4399.92 -1640 .53 6.00 -153.45G L-51 Tgt 2-1 10647 .24 90.00 354.00 8660 .00 8736.40 4668.68 4446.94 -1644 .95 6.00 -151.12G 10700 .00 87.23 352.47 8661 .28 8737.68 4721.32 4499.31 -1651 .16 6.00 -151.08G End Crv 10706 .23 86.90 352.29 8661 .60 8738.00 4727.53 4505.48 -1651 .99 6.00 O.OOG Fault 6 Crossing 11100. 00 86.90 352.29 8682. 88 8759.28 5120.34 4895.11 -1704. 75 0.00 O.OOG Crv 6/100 11679 .82 86.90 352.29 8714 .22 8790.62 5698.74 5468.85 -1782 .44 0.00 82.07G Fault 7 Crossing 11700. 00 87.07 353.49 8715. 28 8791.68 5718.86 5488.85 -1784. 93 6.00 82.OOG 11800 .00 87.92 359.43 8719 .66 8796.06 5818.04 5588.51 -1791 .09 6.00 81.74G U.VU U.UU OytlULOU./0 5tl707;J.VC IV /U.Jb07J/LU W 74y.JJ00/`J7U 0.00 0.00 5980395.01 581762.92 N 70.35645084 W 149.33597583 0.00 0.00 5980494.98 581719.08 N 70.35672526 W 149.33632298 0.00 0.00 5980986.51 581503.53 N 70.35807453 W 149.33802996 1.40 6.08 5980995.32 581499.75 N 70.35809872 W 149.33805986 1.52 5.92 5981032.23 581485.71 N 70.35819997 W 149.33817070 1.67 5.72 5981054.43 581478.52 N 70.35826083 W 149.33822706 1.84 5.46 5981113.88 581463.41 N 70.35842371 W 149.33834458 1.97 5.25 5981117.57 581462.65 N 70.35843380 W 149.33835039 1.98 5.22 5981122.59 581461.65 N 70.35844755 W 149.33835805 2.10 5.02 5981184.44 581452.22 N 70.35861680 W 149.33t~ 2.25 4.73 5981225.15 581448.65 N 70.35872814 W 149.3384 458 0.00 0.00 5981390.14 581438.17 N 70.35917918 W 149.33852513 0.00 0.00 5981494.92 581431.52 N 70.35946564 W 149.33856994 0.00 0.00 5981694.49 581418.84 N 70.36001126 W 149.33865530 0.00 0.00 5981754.37 581415.03 N 70.36017495 W 149.33868091 4.00 0.00 5981806.86 581411.70 N 70.36031845 W 149.33870336 4.00 0.00 5981820.95 581410.80 N 70.36035698 W 149.33870938 4.00 0.00 5981898.11 581405.90 N 70.36056793 W 149.33874239 4.00 0.00 5981979.50 581400.73 N 70.36079043 W 149.33877720 4.00 0.00 5981988.98 581400.13 N 70.36081636 W 149.33878125 4.00 0.00 5982064.71 581395.32 N 70.36102339 W 149.33881364 4.00 0.00 5982153.34 581389.69 N 70.36126568 W 149.33885155 4.00 0.00 5982161.01 581389.20 N 70.36128666 W 149.33885483 0.00 0.00 5982192.37 581387.21 N 70.36137240 W 149.33886825 0.00 0.00 5982192.39 581387.21 N 70.36137246 W 149.33886826 0.00 0.00 5982192.42 581387.20 N 70.36137252 W 149.33886827 0.00 0.00 5982205.96 581386.34 N 70.36140955 W 149.33887406 25.00 0.00 5982245.16 581383.85 N 70.36151672 W 149.3 3 25.00 0.00 5982302.61 581380.20 3 N 70.36167379 W 149.33 1 5.70 -1.87 5982344.29 581377.27 N 70.36178775 W 149.338 55 5.70 -1.87 5982366.00 581375.52 N 70.36184709 W 149.33894787 0.00 0.00 5982423.54 581370.66 N 70.36200444 W 149.33898223 -5.37 -2.69 5982443.75 581368.86 N 70.36205972 W 149.33899509 -5.37 -2.68 5982490.72 581363.92 N 70.36218818 W 149.33903105 -5.25 -2.90 5982543.01 581357.13 N 70.36233123 W 149.33908160 -5.25 -2.91 5982549.17 581356.24 N 70.36234809 W 149.33908832 0.00 0.00 5982938.16 581299.17 N 70.36341250 W 149.33951759 0.00 0.00 5983510.94 581215.13 N 70.36497985 W 149.34014977 0.83 5.95 5983530.91 581212.42 N 70.36503448 W 149.34017007 0.85 5.95 5983630.49 581205.15 N 70.36530676 W 149.34022031 WeIlDesign Ver SP 1.0 Bld( doc40x_56) S-B\Plan L-51 (S-B)\Plan L-51\L-51 (P6) N Generated 3/21/2006 9:11 AM Page 3 of 4 Measured vertical Comments Inclination Azimuth Sub-Sea TVD Tvp NS EW DLS Tool Face Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section ft de d ft ft ft ft ft d 100 ft de de 100 ft de 100 ft ftUS ftUS L-51 Tgt 3-2 11809 .51 88.00 0.00 8720 .00 8796. 40 5827 .40 5598.02 -1791. 14 6.00 83.79G 0.86 5.94 5983640. 00 581205.00 N 70 .36533273 W 149. 34022071 11900 .00 88.60 5.40 8722 .69 8799. 09 5915 .52 5688.33 -1786. 88 6.00 83.63G 0.66 5.97 5983730. 35 581208 .26 N 70 .36557946 W 149. 34018628 End Crv 11925 .56 88.77 6.92 8723 .28 8799. 68 5940 .03 5713.74 -1784. 14 6.00 O.OOG 0.67 5.96 5983755. 78 581210 .72 N 70 .36564887 W 149. 34016405 Fault 8 Crossing 13200. 00 88.77 6.92 8750. 72 8827. 12 7157. 36 6978.59 -1630. 54 0.00 O.OOG 0.00 0.00 5985022. 14 581350. 27 N 70. 36910441 W 149. 33891850 Crv 6/100 13967 .54 88.77 6.92 8767 .24 8843. 64 7890 .51 7740.36 -1538. 04 0.00 -92.28G 0.00 0.00 5985784. 81 581434 .31 N 70 .37118554 W 149. 33816815 14000 .00 88.69 4.98 8767 .96 8844. 36 7921 .67 7772.63 -1534. 68 6.00 -92.24G -0.24 -6.00 5985817. 12 581437 .32 N 70 .37127371 W 149. 33814087 L-51 Tgt 3-3 14082 .99 88.50 0.00 8770 .00 8846. 40 8002. 57 7855.49 -1531. 08 6.00 -92.68G -0.23 -6.00 5985900. 00 581440 .00 N 70 .37150007 W 149. 33811174 14100 .00 88.45 358.98 8770 .45 8846. 85 8019. 33 7872.50 -1531. 23 6.00 -92.65G -0.28 -6.00 5985917. 00 581439 .66 N 70 .37154653 W 149. 33811300 End Crv 14192 .75 88.20 353.42 8773 .16 8849. 56 8111 .42 7964.97 -1537. 37 6.00 O.OOG -0.27 -6.00 5986009. 39 581432 .49 N 70 .37179916 W 149. 33816308 Fault 9 Crossing 14200. 00 88.20 353.42 8773. 39 8849. 79 8118. 65 7972.17 -1538. 20 0.00 O.OOG 0.00 0.00 5986016. 58 581431. 58 N 70. 37181882 W 149. 33816984 TD / 4-1/2" Lnr 15686 .06 88.20 353.42 8820 .00 8896. 40 9600. 93 9447.70 -1708. 46 0.00 O.OOG 0.00 0.00 5987490. 00 581245 .00 N 70 .37584974 W 149. 33 WeIlDesign Ver SP 1.0 Bld(doc40x_56) S-B\Plan L-51 (S-B)\Plan L-51\L-51 (P6) N Generated 3/21/2006 9:11 AM Page 4 of 4 ~~l • • ~~~ WELL FIELD Si RUGTURE L-51 P6) Prudhoe Bay Unit - WOA L-PAD MagneM1r, Paramalen Su,lace Loralion NAD2r AIasM Stale Planes. Zane W. US Feel Miscelbneous Mnrbl BGFM 2W5 Dip 60656' Dale ne 01.2006 Lar. Nr02t0 tA4 NoMnrg 59iB06210 XUS Grtl (:mv •U 66506J]0' Sld. S~D ND Rel. Rotary iaLle lI6 AO0 atuvn MSLI agDx. •LA 212' FS' S]5]92 nT Lon: W1A91992 Alt F.axlnq 5190 flU5 Srvle Fa] 099990,666P Plan: L-51 IP61N Sny Dale Martl~20-}006 0 1600 3200 4800 6400 8000 9600 0 1600 3200 RTE .._.._.. .. _.._.._.._. g ._..~.._.._.._.._.._.._.._.._.:~.._.._.._.._.._.._.._.._ _.._.._.._.._.._.._.._. _ _.._.._.._.._.._.._.._. _.._.._.._.._.._.._.._ Gi Nd 1.51100 End Bld _ .. SV6._.._.._.._.._.._.._ _.. _.._.._.._.._.._.._ ._.._.._.._.._.._.._.._ _.._.._.._.._.._.._.._. _.._.._.._.._.._.._.._. _.._.._.._.._.._.._.._ Drp 1.5/100 .. End Drp ~ ~ 111 „r,.r., SvS~-',r„r„r,.r:,r:w,..,,,r:,r.w..r,.r,.r,.r.w>ir,.r..r,.rotor„r,w..rnr..r.w,w.w,w..r.w,wi.r,w.w..r.w..r.w.,r..r..r.,r.w.w..r..r,.r..r„i.wl _.._ .. $V4•/Base •~errn .._.._.._.._ _.. _.._.._.._.._.._.._ ._.._.._.._.._.._.._.._ _.._.._.._.._.._.._.._. _.._.._.._.._.._.._.._.._. ~. _' _ _ _' _ _'_ .._.. _. Fault 1 CrgssLnA~.._.._.._.._.._.._.._.._.:_.._.._.._.._.._.._.._.._ _.._.._.._.._.._.._.._. _ _.._.._.._.._.._.._.._. _.._.._.._.._.._.._.._..t..- .._.. .: SV3 : r .._.._.. SV2._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.:_.._.._.._.._.._.._.._.._ _.._.._.._.._.._.._.._. _ _.._.._.._.._.._.._.._. _ _.._.._.._.._.._.._.._ - - 9-S18" Csg Pt ... .. ~_.._.._.._ RtS~Crv t3n3b._.._.._.._.._.._.._.._.: Crv ~,~ .._.._.._.._..-.-----.._._.._.._.._.._.._.._.._.._~_.._.._.._.._.._.._.._.._._.._.._..--.-..-.---.--- t --.._.._.._.._.._.._.._....-1 EndCrv - ~.._. _-.L._.._.._.._.._.._.._. _.._______.._.._.._.._.._.._..___.._.._..______ _.._.._.__..._.._.._.._.._.._.._.._.._..__._.._.._.._.._.._.._.._.._..___. 1600 3200 0 0 (D C 4800 N f0 U 3 Crossing 4800 6400 8000 9600 crvatog .._.._..~.._.._.._.._.._.._.._.._..~.._.._. FaukEndrCrv ing .. _.._ _.._.._.._.._.._.._.._..t.._.._.:litYilfiNal~.._.._ - _ ~ _.._::_::_:: _::_ _::_::_: _::_::_::_::_:. _::.::.::_::_::_::_::_: - ~: _ _::_.:_::_::. ~ . i .. ; TJF crv atoo .._.._..~.._.._.._.._.._.._.._.._..~.._.._.._.._.._.._.._TJE.:_.._.. _ ._.._.._.._. _ - - _ - _.._.._.._ TJD [ T 3- Fault 8 Crossin Crv BI100 : L-5 ~ .._.._..~.._.._.._.._.._.._.._.._..~.._.._.._.._.._.. _.._. _. ti.._.._.. ._.._. _ ._ _.._.._.._ _.._.._.._ _ _ . ~ .._.._.._.._.._ .._.. _.._{~ad f-ni 7JC ~ f=ault 6 Crossing 5j End Crv .._.._..~.._.._.._.._.._.._.._.._..~.._.._.._.._.._.._.._.._.i_.._.. ._.._. .a.dt_.. .:_..~. .51.tg0.._:._.._.._.._. _.._.._.._ - _.._.._.._.._.._.._ - .._.._..~.._.._.._.._.._.._.._.._..~.._.._.._.._.._.._.._.. T:_.._..7rlA-.._. .. _ - _ _ _ _. _ _.._.._.._ _.._.._.._ _.._.._.._.._.._.._ _ ~ Sag Rl ;{~ .. I :End Crv ~ • 51 P6' 7" Csg Pt L-51 Tgt 2-t EndEnd Cl ry 1F :Crv 251100 Crv 61100 L-57 Tgt 3.2 Fauk 9 Crossing TD I itl2" Lnr Crv 6/100 End Crv: Fauk 7 Crossing 3400 3000 N 3600 0 1600 3200 4800 6400 8000 961 Vertical Section (ft) Azim = 349.75°, Scale = 1(in):1600(ft) Origin = 0 N/-S, 0 E/-V `~ ` i WELL FIELD STRUCTURE L-51 (P6) Prudhoe Bay Unit - WOA L-PAD Surlace Loralwn NAp2] AlasFa Stela Pkgs. Zone Od. US Feel M14sceYarleais Modell Nr;GM 2005 pID. 60.656° pate June 01. 2006 tal N]02101d1 Naltlsig e062.]OINS ~fM Conv •0635063]0" 5-R TW ReI. Rokry ia0le l]6 dOfl a0ove M5l) Ma9 pec: ~2d.212` F5: 5]5]92nT Lon: W1091B 32.d l1 Easlinq: SB305].9pflU5 Scala Fad OB9990]X366 Plan: L-511PPIN Srvy Oale: MarcM1 20. 2006 -3600 -2400 -1200 0 1200 9600 8400 7200 6000 n n n Z 0 0 N .. 4800 c m U ~ 3600 v 2400 1200 0 9600 8400 7200 6000 4800 3600 2400 1200 0 -3600 -2400 -1200 0 1200 c« W Scale = 1(in):1200(ft) E »> ! • by BP Alaska Anticollision Report Company: BP Amoco Date: 312.1/2006 'f ime: 09:27:45 Page: 1 Field: Prudhoe Bay Reference Site: PB L Pad Co-ordinate(NF.) Reference: Well: Plan L-51 (S-B), True North Reference Welt: Plan L-51 (S-B) Vertical (TVD) Refere nce: L-51 Plan S-B 76.4 Reference Wellpath: _ Plan L-51 _ _ Db: Oracle _ ~ NO GLOBAL SCAN: Using user defined selection & scan criteria Reference: Principal Plan & PLANNED PROGRAM Interpolation Method: MD + Stations Interval: 5.00 ft Erro r Model: ISCWSA Ellipse Depth Range: 28.50 to 15686.06 ft Scan Method: Trav Cylinder North Maximum Radius:10000.00 ft Erro r Surface: Ellipse + Casing Survey Program for Definitive Wellpath - Date: 8/30/2005 Validated: No Version: 3 Planned From To Survey Toolcode Tool N ame ft ft C i F- - - -- - - - ---- - -_ - _----- _ -_ ----- - _ - _ -- - -_ - -~ I 28.50 800.00 ~ Planned: Plan #6 V1 CB GYRO-SS ~ gY g Camera based ro sn le shots , 800.00 2200.00 Planned: Plan #6 V1 MWD MWD -Standard I, 800.00 15686.06 Planned: Plan #6 V1 MWD+IFR+MS MWD +IFR + Multi Station i Casing Points - - -- - Mll TVD Diameter - Hole Site Name - ft ft in in 2598.56 2596.40 9.625 12.250 9 5/8" -- 10343.20 8716.40 7.000 8.750 7" 15686.06 8896.40 4.500 6.125 4 1 /2" Summary ~ <_~_____-_~~ Offset Wellpath -- --------> Reference OfTset Ctr-Ctr No-Go Allowable Site Well V1'ellpath MD MD Distance Area Deviation W"arning ft ft ft ft ft ~ PB L Pad L-01 L-01 V14 542.66 545.00 207.09 10.63 196.46 Pass: Major Risk PB L Pad L-02 L-02 V1 1262.25 1265.00 180.86 20.29 160.56 Pass: Major Risk i PB L Pad L-02 L-02A V5 1263.05 1260.00 180.87 20.41 160.45 Pass: Major Risk PB L Pad L-02 L-02AP61 V2 1263.05 1260.00 180.87 20.41 160.45 Pass: Major Risk PB L Pad L-02 L-02P61 V21 1262.25 1265.00 180.86 20.40 160.45 Pass: Major Risk '. PB L Pad L-03 L-03 V5 531.22 535.00 235.19 11.39 223.81 Pass: Major Risk !, PB L Pad L-101 L-101 V4 648.15 645.00 185.13 13.06 172.07 Pass: Major Risk PB L Pad L-102 L-102 V2 282.40 285.00 370.74 5.65 365.08 Pass: Major Risk j PB L Pad L-102 L-102P61 V10 282.40 285.00 370.74 5.75 364.99 Pass: Major Risk ', PB L Pad L-102 L-102P62 V2 282.40 285.00 370.74 5.75 364.99 Pass: Major Risk PB L Pad L-103 L-103 V23 526.96 530.00 345.92 9.92 336.00 Pass: Major Risk PB L Pad L-104 L-104 V7 442.28 445.00 339.00 8.49 330.50 Pass: Major Risk PB L Pad L-105 L-105 V4 477.57 480.00 298.57 10.03 288.54 Pass: Major Risk PB L Pad L-106 L-106 V14 577.00 585.00 308.61 11.09 297.51 Pass: Major Risk PB L Pad L-107 L-107 V14 199.08 200.00 222.18 5.31 216.86 Pass: Major Risk PB L Pad L-108 L-108 V18 625.43 635.00 276.49 12.91 263.58 Pass: Major Risk '~ PB L Pad L-109 L-109 V12 601.54 605.00 136.45 13.48 122.97 Pass: Major Risk 'I PB L Pad L-110 L-110 V11 606.58 610.00 89.89 12.10 77.79 Pass: Major Risk PB L Pad L-111 L-111 V24 300.19 300.00 16.72 6.52 10.20 Pass: Major Risk PB L Pad L-112 L-112 V8 1019.39 1020.00 157.62 19.26 138.36 Pass: Major Risk PB L Pad L-114 L-114 V15 539.97 540.00 15.79 10.00 5.80 Pass: Major Risk PB L Pad L-114 L-114A V4 539.97 540.00 15.79 10.00 5.80 Pass: Major Risk PB L Pad L-115 L-115 V7 957.80 960.00 196.46 16.84 179.61 Pass: Major Risk PB L Pad L-116 L-116 V10 5204.90 5055.00 149.75 75.91 73.84 Pass: Major Risk PB L Pad L-117 L-117 V11 674.46 675.00 218.51 12.42 206.09 Pass: Major Risk PB L Pad L-118 L-118 V9 199.49 200.00 227.00 4.63 222.37 Pass: Major Risk PB L Pad L-119 L-119 V9 477.47 480.00 388.65 9.44 379.20 Pass: Major Risk PB L Pad L-120 L-120 V8 282.28 285.00 413.80 5.99 407.81 Pass: Major Risk PB L Pad L-121 L-121 V14 454.38 455.00 60.99 9.64 51.35 Pass: Major Risk PB L Pad L-121 L-121A V1 454.38 455.00 60..99 9.64 51.35 Pass: Major Risk PB L Pad L-122 L-122 V5 600.43 600.00 197.01 11.84 185.18 Pass: Major Risk PB L Pad L-123 L-123 V5 200.39 200.00 190.96 4.68 186.28 Pass: Major Risk PB L Pad L-123 L-123P61 V3 200.39 200.00 190.96 4.68 186.28 Pass: Major Risk PB L Pad L-124 L-124 V13 264.59 265.00 181.68 5.56 176.13 Pass: Major Risk PB L Pad L-124 L-124P61 V5 264.59 265.00 181.68 5.56 176.13 Pass: Major Risk PB L Pad L-124 L-124P82 V4 264.59 265.00 181.68 5.56 176.13 Pass: Major Risk PB L Pad L-200 L-200 V7 258.78 260.00 274.40 5.65 268.75 Pass: Major Risk PB L Pad L-200 L-200L1 V3 258.78 260.00 274.40 5.65 268.75 Pass: Major Risk PB L Pad L-200 L-200L2 V6 258.78 260.00 274.40 5.65 268.75 Pass: Major Risk PB L Pad L-201 L-201 V6 272.69 275.00 372.11 5.85 366.26 Pass: Major Risk PB L Pad L-201 L-201 L1 V9 272.69 275.00 372.11 5.85 366.26 Pass: Major Risk ap BP Alaska Anticollision Report Company: BP Amooo Date: 3(21/2006 Time: 09:27:45 Page: 2 Field: Prudhoe Bay Reference Site: PB L Pad Co-ordinate (NE) Reference: Well: Pla n L-51 (S-B) , True North Reference Well: Plan L-51 (S-B) Vertical (TV D) Refere nce: L-51 Plan S-B 76.4 Reference Wellpath: Plan L-51 Db: OraCle Summary ~-------- - OffseC WeBpath - ---------> Reference Offset Ctr-Ctr No-Go Allowable Site Well WcNpath MD MD Distance Arca Deviation Warning ft ft ft ft ft ~- ~ PB L Pad L-201 L-201 L1 PB1 V10 _. 272.69 275.00 372.11 5.85 366.26 Pass: Major Risk PB L Pad L-201 L-201 L2 V5 272.69 275.00 372.11 5.85 366.26 Pass: Major Risk I~ i~ PB L Pad L-201 L-201 L3 V2 272.69 275.00 372.11 5.85 366.26 Pass: Major Risk ' ~ PB L Pad L-201 L-201 L3P61 V6 272.69 275.00 372.11 5.85 366.26 Pass: Major Risk ~ PB L Pad L-201 L-201 P61 V12 272.69 275.00 372.11 5.85 366.26 Pass: Major Risk PB L Pad L-201 L-201 P62 V3 272.69 275.00 372.11 5.85 366.26 Pass: Major Risk PB L Pad L-202 L-202 V5 611.72 615.00 287.46 11.80 275.66 Pass: Major Risk PB L Pad L-202 L-202L1 V7 611.72 615.00 287.46 11.80 275.66 Pass: Major Risk ' PB L Pad L-202 L-202L2 V6 611.72 615.00 287.46 11.80 275.66 Pass: Major Risk PB L Pad L-202 L-202L3 V6 611.72 615.00 287.46 11.80 275.66 Pass: Major Risk ~I PB L Pad L-210 L-210 V6 282.06 285.00 398.72 5.84 392.87 Pass: Major Risk PB L Pad L-210 L-210P61 V8 282.06 285.00 398.72 5.84 392.87 Pass: Major Risk ', PB L Pad L-211 L-211 V6 720.22 720.00 210.08 13.98 196.10 Pass: Major Risk 'I PB L Pad L-211 L-211 PB1 V6 720.22 720.00 210.08 13.98 196.10 Pass: Major Risk PB L Pad L-212 L-212 V11 398.57 400.00 298.26 8.03 290.23 Pass: Major Risk PB L Pad L-212 L-212P61 V9 398.57 400.00 298.26 8.03 290.23 Pass: Major Risk PB L Pad L-212 L-212P82 V2 398.57 400.00 298.26 8.03 290.23 Pass: Major Risk ~~ PB L Pad L-214 L-214 V9 337.47 340.00 354.47 7.49 346.98 Pass: Major Risk ', PB L Pad L-214 L-214A V3 Plan: Plan # 337.47 340.00 354.47 7.49 346.98 Pass: Major Risk ~ PB L Pad L-215 L-215 V7 388.06 390.00 358.63 8.41 350.22 Pass: Major Risk PB L Pad L-215 L-215PB1 V4 388.06 390.00 358.63 8.41 350.22 Pass: Major Risk ', PB L Pad L-215 L-215PB2 V2 388.06 390.00 358.63 8.41 350.22 Pass: Major Risk PB L Pad L-216 L-216 V6 243.00 245.00 333.05 5.31 327.74 Pass: Major Risk ~~ PB L Pad L-218 L-218 V4 905.94 900.00 150.96 16.51 134.45 Pass: Major Risk PB L Pad L-250 L-250 V4 513.89 515.00 262.30 10.68 251.61 Pass: Major Risk ~I PB L Pad L-250 L-250L1 V14 513.89 515.00 262.30 10.68 251.61 Pass: Major Risk PB L Pad L-250 L-250L2 V10 513.89 515.00 262.30 10.68 251.61 Pass: Major Risk ' PB L Pad L-250 L-250P61 V3 513.89 515.00 262.30 10.74 251.55 Pass: Major Risk ~, PB L Pad L-250 L-250P61 005 V4 Plan: 695.82 700.00 279.10 53.86 225.24 Pass: Major Risk PB L Pad L-50 L-50 V1 589.52 590.00 28.03 11.38 16.65 Pass: Major Risk ' PB L Pad L-50 L-SOPB1 V4 589.52 590.00 28.03 11.38 16.65 Pass: Major Risk PB L Pad NWE1-01 L-100 V2 707.64 700.00 177.08 14.35 162.73 Pass: Major Risk PB L Pad NWE1-01 NWE1-01 V5 707.64 700.00 177.08 14.35 162.73 Pass: Major Risk '~ PB L Pad Plan L-203 (N-Q) Plan L-203 V6 Plan: PI 709.57 720.00 320.57 15.07 305.50 Pass: Major Risk PB L Pad ~PB L Pad Plan L-213 (S-Q) Plan L-52 (S-E) Plan L-213 V6 Plan: PI Plan L-52 V1 Plan: Pla 428.27 504.86 430.00 505.00 266.37 46.73 10.69 10.99 255.68 35.74 Pass: Major Risk Pass: Major Risk • ~ Field: Prudhoe Bay Site: PB L Pad Well: Plan L-51 (S-B) i Wellpath: i Plan L-51 100 100 tav Travelling Cylinder Azimuth (TFO+AZ1) [deg] vs Centre to Centre Separation [IOOR/in] L-51 Proposed Completion TREE: FMC 4-1/16" 5M W/ LEO WELLHEAD: FMC Gen 5 System Cellar Elevation = 11", 5M csg.head w/ 7" mandrel hanger & packoff 11" x 11", 5M, tbg spool w/ Rig 7ES RKB = 28.5' 11" x 4-1/2" tubing hanger (XO to 3-1/2") 11" X 4-1/16" Adaptor Flange 3-1/2" 'X' Landing Nipple 2,200' 9-5/8", 40#/ft, L-80, BTC 2,578` 7", 26 #/ft, L80, TC-Ilfrom surface to 4,000' HES Down hole ~ pressure gauge w I-Wire to surface BAKER 3-1/2" x 7" Baker Liner Tie Back Sleeve ZXP Liner Top Packer `HMC' Hydraulic Liner Hanger 10,220' 10,373` 7", 26 #/ft, L80, BTC-Mod 3-1/2"x 1" Camco KBG2 Gas Lift Mandrels with handling pups installed . GAS LIFT MANDRELS # TVD Size Valve T e 7 TBD 1" DV 6 1" DCK Shear 5 1" DV 4 1" DV 3 1" DV 2 1 `° DV 1 1" DV PRODUCTION TUBING DETAILS 3-1 /2",9.3 Ib/ft,L-80,TC-I ID : 2.992" 3-1/2" 'X' Landing Nipple @ ` 7" x 3-1/2" Baker 'S-3' Production Packer @ 10,200' 3-1/2" `X' Landing Nipple @ ` 3-1/2" `X' Landing Nipple @ -' 3-1/2" Mule-Shoe stabbed into 3-1/2" liner tie-back sleeve@` Date Rev By Comments 4/21/06 SRK Proposed Completion 3-1/2" 9.3 #/ft, L-80, slotted liner 15 685` 1, ~ ~.,,, ~ ~Y i.1r"_ _ .t.tL /~ ~~. WELL: L-51 API NO: 50-029- .. ~ ~ t N PLANT 34 - ~ ~~ ~ ~ I 15'00'00~ u, . ` - D GRI L-PAD = ~~~~. ----------- ~ ----------- ---------- ----- PROJECT ~ I AREA T12N I I T11 N j I , ~ w ~ ~ ~ I w_ a~ y; ti> - L-PAD > ~ r -' I I ~~ 3 2 ~ ~ I I ` ` r I I ~ ~ "V - I I I ~ N-L (NWE-1) i ~' i VICINITY MAP I ~a ~a N.T.S. I L-111 i ~ ' N-A (NWE-2) [• I I I ® ~-51 L-2181 I I L-114 ~ ~ L-124 I I L-50 ~ ~ L-1121 I I L-02 I I L-121 ~ ~ L-1231 I I I ~ L-122 I L-110 ~ ~ L-2111 I L-SI ~ ~ L-115( I L-116 ~ ~ L-117 I L-109 ~ ~ L-118 I L-SL ~ I I ~ L-250 I L-01 ~ ~ L-200 I L-107 ~ L 03 ~1D ~ ~ L-202 L 21 I I - ~ I ~ - 21 ~ L-SPARE I L-213i ~ ~ ~ L-203 I L-1061 _ 6 ~ (• L-2161 ~ L-1051 ~ ~ ~ L-1031 I L-106 ~ ~ ~ L-21St ~ I SLOT L-SU ~ ~ L-201 I I L-104 ~ ~ L-119( I I L-214i~ ~ L-2101 I I L-102 ~ I a~ ~ L-120 I I I I I I I I I I ~ sao ses solo sis I I I / //_ // // / ~ / / LEGEND NOTES AS-STAKED CONDUCTOR 1. DATE OF SURVEY: MARCH 15, 2006. 2. REFERENCE FIELD BOOK: W006-03 PAGES 23-26. ~ EXISTING CO NDUCTOR 3. ALASKA STATE PLANE COORD]NATES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD 27. 4. BASIS OF HORIZONTAL LOCATION [S OPERATOR MONUMENTS, WOA L-PAD MONUMENTATION. 5. BASIS OF ELEVATION IS OPERATOR MONUMENTS PER F.R. BELL & ASSOCIATES. ELEVATIONS ARE BPX MEAN SEA LEVEL DATUM. 6. MEAN PAD SCALE FACTOR IS 0.999907827. LOCATED WITHIN PROTRACTED SEC. 34, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC PAD SECTION NO. COORDINATES COORDINATE POSITION DMS POSITION D.DD ELEV. OFFSETS L-51 Y=5,978,062.76 N 9,820.00 70'2100.145° 70.3500403' 47 6' 2,343 FSL ' X= 583,057.90 E 5,015.00 149'19'32.411" 149.3256697' . 3,859 FEL by LuJUUU ~a0s ~L a,-00 WOA L-PAD ~ a44OO ~o doa Ho: AS-STAKED CONDUCTOR ,~ ~ vw~s SCALE: WELL L-51 sn scar mxrEm uxe 1 "= 150' .~w=~. w..~. ~.s SHEET: 1 OF 1 • ~D co N ` ,v u' ( V e ~~ Oe U V a ~~ ~~ 2 ~ Y ~ vo m, mti ~rn J Q,~Q R v0~~~ Q~ ~Q ~ ~~ ~<v o ° ~ m`~~ l tv m v pro ~ Q ~ma = ~~~ m ~ aQ~ ?. .y ~ o Q ~~ cp N ti z s ... 0 ~o o° 0 z ti f~ 0 ~ • TRANSMITTAL LETTER CHECKLIST WELL NAME _ ~~~~ •~~ PTD# ,2 p ~'- d, f9 Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well , (If last two digits in permit No. API No. 50- - - API number are , between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for (name of well) until after (Company NameZhas designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company NameZmust contact the Commission to obtain advance approval of such water well testing ro ram. Rev: 1/25/06 C : \j ody\transmittal_checkl ist WELD PERMIT CHECKLIST Field 8 Pool PRUDHOE BAY, PRUDHOE OIL - 640150 _ _ _ _ _ Well Name: PRUDHOE BAY UNIT L-51 __ ___ __Program DEV _____ ______ Well bore seg i. j PTD# 2060590 Company BP EXPLORATI.ON_(ALASKA~INC___-___ _ _ __ _____ Initial Classlfype _._DEV t 1-OIL _- GeoArea ____ _ __ _ Unit __ - _ On/Off Shore On Annular Disposal fL J Administration .1 Pe[mit_fee attached_ - Yes i2 Lease number appropriate - Yes !,3 UniqueWelLnameandnumbe[ Yes ~':4 Well located in a_definedpool _ _ _ - . _ - _ _ _ _ _ _ _ - - _ _ _ . - _ _ _ . _ Yes I5 Well located proper distance-from drilling unit-boundary_ Yes ~6 Well located proper distance f[om other wells_ Yes ~,7 Sufficient acreage available in drilling unit _ - - - - - - - - - - - - - -- - - - - - - - - - - Yes _ IS If_deviated, is_wellbore plat_included . - _ _ _ _ _ _ _ _ Yes I~9 Operator only affected party . - .. - - - - - - - - - - - - - - - - - - - - - - Yes . 10 Operator has-appropriate-bond in force - - - - - - - - - - - - - - - - - - - _ - _ _ _ _ _ - - . Yes 11 Pe[mitcan be issued without conservation order_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes 12 Permitcan be issued without administ[alive-approval _ _ . - - - - - _ _ _ _ _ _ - ... _ Yes pp A r Date I'I13 Can permit be approved before 15•day wait_ - - - - - .. - Yes _ RPC 51112006 114 Wetl located within area and-strata authorized by-Injection Order # (put_ 10# in_comments) (For NA- ',15 Allwells-within 114_mile area of review identified (Forservice-well only) . - - N_A ~i,16 Pre-produced injector; duration of pre production less than_ 3 months_(For service well only) NA ~I ACMP_Findng of Consistency-has been issued-focthis pr_oject_ - - - - NA %18 Conductor sting-provided - - - - - - - - - - - - - - - - - - - - - - - - - Yes ... .. 20" @110', _ _ Engineering 19 Surface casing-protects all known. USDWs Yes '120 CMT_vo(adequateto circulate on conductor& su_rf_csg Yes Ade_ uate excess. q i21 CMT vol_ adequate_to tie-in-long string tosurf csg- - - - - - - - - - - - - - - - - - - - - - No_ 22 CMT_will coyer ah known productive horizons_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes ~1i23 Casing designs adequate foc C, T, 6 &_permafrost_ _ _ _ _ _ _ _ _ _ _ __ _ _ _ __ _ _ _ _ Yes 124 Adequate tankage_or reserve pit _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ ___ _ _ Yes _ Nabors 7E$, _ _ '25 If a_re-drill, has_a_ 10.4.03 for abandonment been approved - - NA_ New well, x,26 Adequate wellboreseporation-proposed Yes 127 If_diverter required, does it meet regu_lations_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes 128 .Drilling fluid-program schematic.& equip list adequate Yes Max. MW-11,8_ppg. Appr Date '~29 BOPEs,.dothey meetregulation - - - - - - - - - - - - - - - - Yes - WGA 51112006 30 BOPE_press rating appropriate; test to_{put prig in comments)_ Yes Test to 3500-psi. ,MSP 3271 psi. i31 Choke-manifold complieswlAPI_RP-53 (May 84)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ x'32 Work will occur without operation shutdown- _ - _ - . Yes _ 133 Is presence of H2S gas probable . No- Not an H2S pad. '~ Mechanical-condition of wells within AOR verified (Forservice well only) . _ - - - - NA_ ,35 Permit_can be rssued wlo hydrogen sulfide measures No- . - Geology ~36 Data presented on-potential overpressur_ezones- .. - _ _ _ _ _ .. _ - - _ - _ _ tJA- _ '.37 Seismic analysis_ of shallow gas zones NA _ Appr Date X38 Seabed condition suruey_(ifoff-shore) _ _ _ .. - - _ _ _ _ _ NA _ _ _ _ 1,39 Contact namelphone for weekly_progress reports_[exploratory onty] - - _ NA_ Geologic Engineering Commissioner: Date: Commissioner: Date ~~ 5~~~~ ~~>~~~~ ~1 fp Date ~' ~ ~ tJ~ •