Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
198-096
Re.covg) • 2-7ir 11E1011NOV 11 201° PRINT DISTRIBUTION LIST BAKER HUGHES AO®'GC Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc. BP Exploration(Alaska)Inc. Petrotechnical Data Center,LR2-1 DATA LOGGED l\/Ko/201Cv WELL NAME L2-11 900 E.Benson Blvd. M.K.BENDER Anchorage,Alaska 99508 FIELD Prudhoe Bay Unit to acknowledge receipt of this data. COUNTY North Slope Borough LOG TYPE RPM:PNC3D --- BHI DISTRICT Alaska --- LOG DATE July 11,2016 AUTHORIZED BY Paul Canizares EMAIL Paul.Canizares(c�bakerhughes.com TODAYS DATE November 8,2016 Revision STATUS Final Replacement: No Details: Rev. Requested by: --- FIELD/ CD/DVD FINAL COMPANY PRELIM FINAL (las,dlis,PDF,META, SURVEY REPORT ADDRESS(EDEX WILL NOT DELIVER TO P.O.BO* LOGS LOGS CGM,Final Surveys) (Compass) PERSON ATTENTION #OF PRINTS #OF I'KIN I S #OF COPIES #OF COPIES #OF COPIES 1 BP North Slope. 0 0 0 0 0 EOA,PBOC,PRB-20(Office 109) D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. 0 1 1 0 0 Attn:Ricky Elgarico ATO 3-344 700 G Street Anchorage,AK 99510 3 ExxonMobil,Alaska 0 I 1 1 0 0 Attn:Lynda M.Yaskell and/or Lisa Boggs 3201 C Street,Suite 505 Anchorage,AK 99503 4 State of Alaska -AOGCC 0 I 1 I 1 0 0 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas *** 0 1 I 1 0 0 Attn:James Hyun 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 • 6 BP Exploration(Alaska)Inc. 0 0 0 I 0 0 Petrotechnical Data Center,LR2-1 c 900 E.Benson Blvd. SCANNEDDECQ c Anchorage,Alaska 99508 �" +216 Attn:David Itter TOTALS FOR THIS PAGE: 0 4 4 0 0 TOTALS FOR ALL PAGES: 0 4 4 0 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COW/1010N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Pull Tubing Q Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing El Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well Q Re-enter Susp Well 0 Other:Scab Liner Q 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 198-096 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22885-00-00 7. Property Designation(Lease Number): ADL 028321 8. Well Name and Number: PBU L2-11 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 11485 feet Plugs measured None feet true vertical 8670 feet Junk measured None feet JAN 11 2016 Effective Depth: measured 11367 feet Packer measured 8171 feet true vertical 8667 feet Packer true vertical 7802 feet AO G CC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 38-118 38-118 3650 9-5/8" 38-3688 38-3685 6870 4760 Intermediate 8590 7" 36-8626 36-8210 7240 5410 Liner 4271 5-1/2" 4204-8475 4193-8075 7740 6280 Liner 3016 4-1/2" 8468-11484 8069-8670 8430 7500 Perforation Depth: Measured depth: 9760-11260 feet iCA M t.r 4 '- True vertical depth: 8711-8674 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr85 x 3-1/2"9.2#13Cr80 34-8494 34-8092 Packers and SSSV(type,measured and 3-1/2"HES TNT Packer 8171 7802 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: Tubing Cut and Pulled from 8466'.Ran 5-1/2"17#L-80 Scab Liner from 4204'-8475'.Cement Scab Liner with 60 Bbls,1.31 yield(257 sx)Class'G'.Run 4-1/2"12.6#13Cr85 x 3-1/2"9.2# 13Cr80 Tubing to 8494'. 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 500 0 Subsequent to operation: 0 0 0 PO 0 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 315-596 Contact Warren,Abigail M Email Abigail.Warren@bp.com Printed Name Joe Last t Title Drilling Technologist Signature Phone +1 907 564 4091 Date 1/1 1/15 Form 10-404 Revised 5/2015 r7-t- 1/i311 JL RBDMS JAN 1.2 2016 Submit Original Only 4t e/3/ • • L2-11 Well History (Pre-Rig Workover) ACTIVITYDATE T/I/O=SSV/500/220, Temp=SI. PPPOT-T (PASS), PPPOT-IC (PASS), pre RWO. PPPOT-T: Stung into test port(0+ psi), bled void to 0 psi. Monitored for 10 min, no change in pressure. Functioned LDS, all moved freely(1"). Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost 150 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test port(100 psi), bled void to 0 psi. Monitored for 10 min, no change in pressure. Functioned LDS, all moved freely(1"). Pumped through void, good returns. Pressured void to 3500 psi for 30 min test, lost 100 psi in 15 min, lost 0 psi in 9/26/2015 second 15 min (PASS). Bled void to 0 psi. T/I/O = SSV/500/220. Temp = SI. Cement B & C lines (pre rig). Pumped hydraulic fluid down B & C lines and confirmed injectivity. Pumped 0.5 gallons Squeeze Crete down balance line and pressure locked up @ 4000 psi with no fall off in 5 min, bled to 1000 psi. Pumped 0.5 gallons Squeeze Crete down balance line and pressure locked up @ 4000 psi with no fall off in 5 min, bled to 1000 psi. Pumped —2 ounces hydraulic fluid into both B & C lines to clear needle valves of Squeeze Crete. Job complete. 10/26/2015 SV, WV, SSV= C. MV= O. IA, OA = OTG. 14:00 hrs. ***WELL SHUT IN ON ARRIVAL***(rwo expense) ATTEMPT TO DRIFT W/3.80" CENT& 3.50" LIB, S/D @ 47'SLM(bha coated w/ paraffin) 10/27/2015 DRIFT W/3.25" CENT& 3.0" S. BAILER TO 2100' SLM(no issues, clear drift) ***WSR CONTINUED FROM 10/27/15***(rwo expense) MAKE 3 RUNS W/4-1/2" BRUSH & G. RINGS TO CLEAN UP PARAFFIN FROM 47' SLM -200' SLM(see log for details) DRIFT W/3.80" CENT & 3.50" LIB, TAG BKR STRADDLE PATCH @ 6286' SLM(impression of clean fish neck) PULL 4-1/2" BKR KB STRADDLE PATCH FROM 6298' MD(all slips &elements recovered) 10/28/2015 DRIFT W/3.80" CENT, TAG 4-1/2"XX NIP REDUCER @ 8429' SLM/8440' MD ***WSR CONTINUED FROM 10/28/15***(rwo expense) PULL 4-1/2"XX NIP REDUCER FROM X-NIP @ 8427' SLM/8440' MD MAKE 2 DRIFT RUNS W/3.80" CENT& 3.50" LIB, WORK TOOLS DOWN TO 9247' SLM(impression of ibp fish neck) RUN 4-1/2"X-LINE FOR CORRECTION, LOC X-NIP @ 8774' SLM/8790' MD(+16' correction) 10/29/2015 MAKE 2 ATTEMPTS TO PULL IBP @ 9263' MD(unable to equalize& latch) T/I/O=430/425/251 Temp= S/I Assist slickline (RWO Expense) CMIT-TxIA to 3500 psi ***FAILED***, MIT-OA to 1200 psi ***PASSED*** Pumped 50 bbls of 100*crude down the IA in attempt to achieve CMIT-TxIA test pressure. Pumped an additional 50 bbls of 100*crude to establish a LLR of 5 bbls/min @ 1800 psi (see log for details). Pumped 0.75 bbls of 100*crude to achieve test pressure for MIT-OA. First 15 min OA lost 63 psi. Second 15 min OA lost 23 psi for a total loss of 83 psi in 30 mins. Bled back — 0.5 bbls. DSO and Fullbore notified of well status. Caution tags hung on Wing, IA, OA valves, AFE sign hung on master valve. Final valve postions: SV,SSV,WV= Closed. 10/30/2015 MV= Open, IA/OA= OTG. FWHP's= 1003/625/76 Well shut in upon LRS departure. **WELL SHUT IN UPON ARRIVAL**(rwo prep) SPOT UP EQUIPMENT, STAND BY FOR RAP 10/30/2015 **CONT ONTO 10-31-15 WSR** • • L2-11 Well History (Pre-Rig Workover) T/I/O = 650/600/60. Temp = SI. T & IA FLs (EL request). No AL. T, IA&OA FLs all @ surface. 10/30/2015 SV, SSV = C. WV = LOTO. MV= 0. ***WSR CONTINUED FROM 10/29/15***(rwo expense) PULL 2-1/8" BKR IBP FROM 9263' MD(elements &stiffener ring recovered) SET 4-1/2" HES CBP @ 8499' SLM/8515' MD LRS ATTEMPT TO CMIT TxIA TO 3500 PSI(fail, see Irs log fork) 10/30/2015 ***WELL TURNED OVER TO DSO/LRS TO CONTINUE TESTING*** ***JOB CONTINUED FROM 30-OCT-2015 *** (SLB ELINE - GRAVEL PACK LOG/ TUBING CUT) INITIAL T/I/O =670/600/60 PSI STANDBY FOR RAP SHEET. RU PT. RUN 1: LOG GRAVEL PACK BASELINE (60 FPM)AND ACTIVATION (10 FPM) PASSES FROM 5500'TO 8455' RUN 2: CUT TUBING AT 8405', CCL TO MID CUTTER= 22.81', CCL STOP DEPTH = 8382.19' RUN 3: CUT TUBING AT 5986', CCL TO MID CUTTER= 22.81', CCL STOP DEPTH = 5963.19', SAW TBG PSI DECREASE AFTER CUT. LOGS CORRELATED TO 4.5"TUBING SUMMARY DATED 24-JUN-1998. 10/31/2015 ***JOB CONTINUED ON 01-NOV-2015*** ***JOB CONTINUED FROM 31-OCT-2015 *** RIG DOWN. FINAL T/I/O = 510/600/0 PSI 11/1/2015 ***JOB COMPLETE. WELL S/I UPON DEPARTURE *** T/1/O=SSV/580/0. Temp=SI. PT B&C lines to 3500 psi FAIL(Pre RWO). TBG & IA has hardline RU to circ out skid. Control line pressure= 0 psi, Balance line pressure= 0 psi. Pressured control line to 3837 psi w/enerpac pump. Lost 215 psi in 15 min (14.3 psi per min, see log for details). Pressured balance line to 3973 psi. Lost 307 psi in 15 min (24.6 psi per min, see log for details). Bled B&C lines to 0 psi. Final 11/5/2015 WHPs=SSV/580/0. T/1/0=610/573/31 Temp=S/I Load TBG & IA then FP (Pre RWO) Pump 5 bbls Meth spear down TBG followed by 145 bbls 9.8 Brine. Pumped 8 bbls Diesel for FP. Pump[ed 5 bbl Meth spear down IA followed by 154 bbls 9.8 Brine. Pumped 9 bbls diesel 11/6/2015 for FP. SV,WV,SSV=Closed MV=Open IA/OA=OTG FWHP=580/438/550 ***WELL SHUT IN ON ARRIVAL SWCP 4521***(rwo expense) RAN BRUSH & 3.75" G-RING TO SSSV NIP. SET DB-DSSSV @ 2154' SLM(2183' MD). Min id = 2.64" PRESSURE TEST CTR LINE TO 3582psi (loss of 67psi) PASS. 11/8/2015 ***CONTINUE WSR TO 11/09/15*** ***CONTINUE WSR FROM 11/08/15 SWCP 4521***(rwo expense) PRESSURE TEST BAL LINE TO 3609psi (loss of 16psi). 11/9/2015 ***WELL LEFT S/1 ON DEPARTURE*** T/I/O = 110/Vac/Vac. Temp = SI. WHPs (Pre RIG). No AL. No wellhouse. 11/11/2015 SV, SSV= C. WV = LOTO. MV= 0. IA, OA =OTG. 2150 hrs. • L2-11 Well History (Pre-Rig Workover) T/I/O= 0/0/0. Barriers = SSV x SV. LTT (passed) Attempted to build up pressure on tubing. (failed) Ordered a full-bore truck to achieve desired pressure prior to setting TWC. Installed integral flange for LRS. Torqued and PT'd t to API specs. Little Red Pumped up tubing pressure. 127psi (T) 300 psi (IA). RU CIW lubricator w/H-plug TWC#431 and stabbed onto tree. Set TWC @125". Removed upper tree and installed 4" TEMP#25. Torqued to API specs. CO with Day Shift On Site. PTed CV to 300./5000 . RU IA Piggyback Temp#95. Torqued flanges to API Specs PTed to 300/3500. RU OA PiggyBack Temp#30. Torqued to API Specs. PTed to 300/3500. Bled IA to 250 PSI RDMO ***Job Complete***SEE LOG FOR 11/20/2015 DETAILS. Final T/I/O= TWC/250/0. Please refer to Well Site Leader(Rob Bryan)for T/I/O= 0/0/0 Temp=S/I Obj: Pre RWO Pressure up IA to 300 psi using 34 bbls DSL to assist valve crew. Job cancelled, unable to catch pressure due to production casing leak. FWHP= 287/348/0 Valve positions= MV=O OA,IA=OTG SV,WV,SSV=C DSO notified 11/21/2015 of well status. Valve crew in control of well upon LRS departure T/I/O=TWC/220/100.Pull CIW "H"TWC#432. Pump Through IA To Verify 11/26/2015 Comunication.Set BPV#251 See Log For Details, Final T/I/O= BPV/258/100 • • North America-ALASKA-BP Page 1 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/me:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.1ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/27/2015 12:00 - 14:00 2.00 RIGD P PRE PREP TO SKID RIG FLOOR INTO MOVING POSITION -PJSM ON PREPPING RIG FLOOR FOR SKIDDING -CHECK WHEEL DRIP PANS FOR FLUID/LEAKS -CLEAN OUT RIG WASHER -RIG DOWN TRAILERS FOR MOVING 14:00 - 15:00 1.00 RIGD P PRE PREP RIG FOR MOVING OFF OF WELL -MOVE ROCKWASHER -MOVE ULTRA LOW DIESEL FUEL TRAILER -MOVE LUNCH TRAILER -POSITION RIG MATS FOR MOVING RIG 15:00 - 16:00 1.00 RIGD P PRE SKID RIG FLOOR INTO MOVING POSITION -PJSM -SKID RIG FLOOR INTO MOVING POSITION 16:00 - 17:30 1.50 RIGD P PRE MOVE RIG OFF OF WELL -PJSM -CHECK RADIO COMMUNICATIONS -VERIFIED STOP SIGNAL AND COMMANDS -TEST MOVING SYSTEM ESD -NOTIFIED PAD OPERATOR OF MOVING OFF OF WELL -VERIFY NO PRESSURE ON WELL TBG/IA/ OA=O/0/0 PSI 17:30 - 21:00 3.50 MOB P PRE INSTALL FRONT BOOSTERS -PJSM -INSTALL GOOSENECK AND BOOSTER ASSEMBLY -INSTALL SIDE BEAMS 21:00 - 23:30 2.50 MOB P PRE INSTALL REAR BOOSTERS -PJSM -CLEAR OUT RIG MATS FROM IN BACK OF RIG -INSTALL REAR BOOSTER ASSEMBLY 23:30 - 00:00 0.50 MOB P PRE PJSM ON RIG MOVE -REVIEW STOP SIGNALS AND COMMANDS -CHECK RADIO COMMUNICATIONS PJSM ON RIG MOVE 11/28/2015 00:00 - 06:00 6.00 MOB P PRE MOVE RIG FROM S-PAD TO DS-L2 -MOVE RIG DOWN S-PAD ACCESS ROAD -RIG ON SPINE ROAD AT 02:30 AM -RIG AT M-PAD AT 05:30 06:00 - 18:00 12.00 MOB P PRE MOVE RIG FROM S-PAD TO DS-L2 -MOVE RIG DOWN SPINE ROAD TO K-PAD ACCESS ROAD -MOVE RIG DOWN K-PAD ACCESS ROAD TO WESTDOCK ROAD 18:00 - 00:00 6.00 MOB P PRE MOVE RIG FROM S-PAD TO DS-L2 -MOVE RIG DOWN K-PAD ACCESS ROAD TO WESTDOCK ROAD -RIG TURNED ONTO WESTDOCK ROAD AT 22:00 -MOVE RIG DOWN WESTDOCK ROAD TO LISBURN ROAD -MIDNIGHT LOCATION-2 MILES WEST OF OXBOW ROAD ON WESTDOCK ROAD Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 2 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB©50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/29/2015 00:00 - 04:30 4.50 MOB P PRE MOVE RIG FROM S-PAD TO DS-L2 -MOVE RIG DOWN WESTDOCK ROAD TO LISBURN ROAD -MOVE RIG DOWN LISBURN ACCESS ROAD AT 02:30 AM -MOVE RIG DOWN LISBURN ACCESS ROAD ONTO DS-L2 04:30 - 08:00 3.50 MOB P • PRE SPOT RIG ON PAD,REMOVE BOOSTER WHEELS AND GOOSENECK FRAMEWORK -PJSM -SPOT RIG ON PAD -REMOVE SIDE BEAMS AND BOOSTER WHEELS FROM FRONT OF RIG —REMOVE REAR BOOSTER WHEELS 08:00 - 10:00 2.00 MOB P PRE SPOT RIG OVER WELL -PJSM COVERING HAZARDS AND SIGNALS -240 PSI ON IA.RECIEVED APPROVAL FROM WTL TO PULL OVER WELL WITH PRESSURE ON IA -0 PSI ON OAAND TREE ABOVE BPV -TEST RIG MOVING SYSTEM ESD BEFORE FINAL APPROACH TO WELL AND ESD BUTTON MANNED BY TOOL PUSHER WHILE SPOTTING OVER WELL -PULL RIG OVER WELLAND SPOT -SHIM UP RIG 10:00 - 11:00 1.00 RIGU P PRE SKID RIG FLOOR -PJSM -SKID RIG FLOOR *SIMOPS-SPOT ROCKWASHER 11:00 - 13:00 2.00 RIGU P PRE RIG UP RIG FLOOR AND ROCK WASHER -PJSM -HOOK UP ALL LINES TO RIG FLOOR -HOOK UP ALL LINES TO ROCK WASHER ***ACCEPT RIG AT 12:00 11/29/2015 13:00 - 13:30 0.50 RIGU P PRE PERFORM RIG EVAC DRIL WITH H2S IN CELLAR SCENARIO -TESTED RIG ESD'S DURING EVAC DRILL CONDUCT AAR WITH RIG CREWAFTER DRILL 13:30 - 16:00 2.50 RIGU P PRE RIG UP -PREP CELLAR FOR PUMPING -PREP MUD PITS TO RECIEVE FLUID -WORK ON CONVEYOR CHAIN LINKS -CHANGE OUT ROTARY LOCKS ON TABLE -SPOT CHOKE IN POSITION -HARD LINE CREW HOOK UP HARD LINE AND TEST TO 300/4200 PSI-GOOD TEST 16:00 - 18:30 2.50 RIGU P PRE PULL BPV -RIG UP AND TEST LUBRICATOR TO 300/3500 PSI-GOOD TEST -PULL BACK PRESSURE VALVE-150 PSI ON TUBING-240 ON IA -PULL LUBRICATOR TO RIG FLOOR 18:30 - 20:00 1.50 RIGU P PRE RIG UP CIRCULATE OUT FREEZE PROTECT -PJSM -RIG UP CHOKE SKID TO WELLAND IA TO RIG Printed 12/28/2015 1:48:54PM • North America-ALASKA-BP Page 3 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.1ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 21:00 1.00 RIGU P PRE PRESSURE TEST MUD LINES -PJSM -PRESSURE TEST MUD LINES FROM MUD PUMP TO FLOWBACK TANK.300 PSI LOW/ 3500 PSI HIGH-GOOD TEST 21:00 - 23:00 2.00 RIGU P PRE CIRCULATE OUT FREEZE PROTECT -PUMP DOWN TUBING TAKING RETURNS THRU IA TO FLOWBACKTANK -START PUMPING AT 5 BPM-1050 PSI ON PUMPS,125 PSI AT CHOKE,100 PSI ON OA -AFTER 70 BBLS AWAY,OA INCREASED TO 240 PSI. -BLED OA DOWN WHILE CONTINUE TO PUMP-OA BLED OFF QUICKLY TO 0 PSI -FCP AT 5 BPM 1040 PSI ON PUMPS -PUMPED 285 BBLS WITH 270 BBLS RETURNED TO FLOWBACK TANK -PERFORM 10 MINUTE FLOWCHECK ON TUBING AND IA-WELL STATIC -SHUT IN TUBING,IA AND OA -RIG DOWN AND BLOW DOWN LINES TO TREE 23:00 - 00:00 1.00 RIGU P PRE RIG UP AND LOWER LUBRICATOR WITH TWC -PJSM -LOWER LUBRICATOR AND CONNECT TO TREE -PT QUICK TEST SUB-GOOD TEST 11/30/2015 00:00 - 00:30 0.50 BOPSUR P PRE SET TWC -PJSM -SET TWC WITH TESTED LUBRICATOR 00:30 - 01:00 0.50 BOPSUR P PRE TEST TWC FROM BELOW -PERFORM ROLLING TEST ON TWC FROM BELOW-1.8 BPM FOR 5 MINUTES TO HOLD 500 PSI.NO LEAKS PAST TWC IN TREE 01:00 - 01:30 0.50 BOPSUR P PRE BLOW DOWN LINES TO CHOKE SKID AND FLOWBACK TANK 01:30 - 03:00 1.50 BOPSUR P PRE TEST TWC FROM ABOVE -IA PRESSURE 0 PSI -RIG UP AND TEST TWC FROM ABOVE 300 PSI LOW/3500 PSI HIGH FOR 5 MINUTES-GOOD TEST -RIG DOWN HYDRAULIC LUBRICATOR 03:00 - 03:30 0.50 BOPSUR P PRE PERFORM RIG EVAC DRILL WITH"A"CREW -SIMULATED H2S GAS RELEASE WITH RIG EVACUATION FOLLOWED BY AAR WITH RIG CREW 03:30 - 04:30 1.00 BOPSUR P PRE RIG UP AND FILL IA -PJSM -RIG UP LINE TO CONTINUALLY FILL AND MONITOR IA -CHECK IA FOR PRESSURE-WELL ON VAC -FILL IA WITH 9.8 BRINE-TOOK 7.5 BBLS TO FILL *SIMOPS-FREEZE PROTECT FLOWBACK SKID AND LINE TO FLOWBACK TANK 04:30 - 06:00 1.50 BOPSUR P PRE NIPPLE DOWN TREE -PJSM -NIPPLE DOWN TREE -FMC TERMINATE CONTROL LINES IN HANGER Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 4 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs j Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 08:30 2.50 BOPSUR P PRE NIPPLE UP BOPE -PJSM -NIPPLE 11"X 13-5/8"ADAPTER FLANGE -NIPPLE UP BOPE TO ADAPTER FLANGE -BOPE STACK CONFIGURED WITH 13-5/8" ANNULAR PREVENTER,3-1/2"X 6"VBRs, BLIND/SHEARS,2-7/8"X 5"VBRs. 08:30 - 11:00 2.50 BOPSUR P PRE RIG UP TO TEST BOPE -PJSM -RIG UP BOPE TESTING EQUIPMENT -FILL IA WITH 9.8 BRINE-8 BBLS TO FILL -INSPECT TOP DRIVE AND PERFORM PRE-SPUD DERRICK INSPECTION -CALIBRATE AND TEST GAS ALARMS 11:00 - 17:00 6.00 BOPSUR P PRE PRESSURE TEST ALL BOPE AS PER AOGCC REGS,SUNDRY#315-596,AND GP 10-45. -PJSM,REVIEW DDI SOP AND PRESSURE CROSSCHECK WITH CONFIRMATION OF CORRECT RESPONSES. -FILL BOPE STACK WITH FRESH WATER. -VERIFY LINE UP AND FILL STACK AND CHOKE MANIFOLD. -TEST BOPE TO 300/3500 PSI FOR 5/5 CHARTED MIN. -TEST ANNULAR TO 300/3500 PSI FOR 5/5 CHARTED MIN. -TEST BLOWOUT PREVENTERS AND ALL ASSOCIATED BOPE. -UPPER 3-1/2"X 6"VBRs TESTED WITH 4" AND 4-1/2"TEST JOINT. -LOWER 2-7/8"X 5"VBRs TESTED WITH 4" AND 4-1/2"TEST JOINT. -ANNULAR PREVENTER TESTED WITH 4" TEST JOINT. -BLIND/SHEAR RAMS TESTED. -TEST CHOKE MANIFOLD VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES. -TEST MANUAL AND HYDRAULIC IBOP'S ON TOP DRIVE. -TEST FLOOR AND DART VALVES. -TEST MAN ADJ/SUPER CHOKE=1500 PSI/ 5 MIN -PERFORM DRAW DOWN TEST OF ACCUMULATOR. -FUNCTION BOPE FROM REMOTE PANEL AND MAIN UNIT. ALL TESTS WITNESSED BY TOOLPUSHER AND WSL. *AOGCC GIVEN NOTIFICATION OF BOPE TEST 11/29/2015 @ 04:35 HRS. AOGCC INSPECTOR JEFF JONES WAIVED RIGHT TO WITNESS BOPE TEST "FLUID LOSS FROM MIDNIGHT TO NOON-16 BBLS 17:00 - 18:30 1.50 BOPSUR P PRE RIG DOWN TEST EQUIPMENT. -RIG DOWN ALL BOPE TESTING EQUIPMENT. -CLEAR LINES FREE OF FLUID. -MAKE UP SAFETY JOINT WITH 4-1/2"LIFTER. Printed 12/28/2015 1:48:54PM • North America-ALASKA-BP Page 5 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 20:30 2.00 WHSUR P DECOMP PULLTWC -PJSM -RIG UP DUTCH RISER AND LUBRICATOR -TEST DUTCH RISER AND LUBRICATOR TO 300 PSI/3500 PSI FOR 5 MINUTES EACH-GOOD LEAK TIGHT TEST -PULLTWC-WELL ON VACUUM 20:30 - 21:30 1.00 WHSUR P DECOMP RIG DOWN DUTCH RISER AND LUBRICATOR -PJSM -RIG DOWN LUBRICATOR AND DUTCH RISER 21:30 - 22:30 1.00 PULL P DECOMP RIG UP LANDING JOINT AND SCREW IN TO PULL COMPLETIONS -PJSM -MAKE UP LANDING JOINT WITH 4-1/2"NSCT CROSSOVER -CHECK IA PRESSURE-0 PSI -SCREW INTO HANGER-8 1/2 TURNS -SCREW DRILL PIPE INTO TOP DRIVE ATTEMPT TO FUNCTION IBOP WITH NO MOVEMENT -STEAMED IBOP AND FREED UP 22:30 - 00:00 1.50 PULL N RREP -0.60 DECOMP CLEAR ICE PLUG FROM KELLY HOSE/ TOPDRIVE -PJSM -UNSCREWED LANDING JOINT FROM HANGER -LINE UP HOLE FILL ON WELL TO KEEP HOLE FULL -DISCONNECT KELLY HOSE AS PER DOYON SOP -BLOWAIR THRU KELLY HOSE-HOSE CLEAR SNAKE IN STEAM LINE ON TOP DRIVE GOOSENECK -PJSM -CLEARED ICE PLUG FROM GOOSENECK ON TOPDRIVE -GOT STEAM FROM SAVER SUB *FLUID LOSS FROM NOON TO MIDNIGHT-53 BBLS 12/1/2015 00:00 - 01:00 1.00 PULL N RREP -0.60 DECOMP THAW OUT AND BLOW DOWN KELLY. -PJSM. -BLOW DOWN AS PER DOYON SOP. MAKE UP HOSE TO TOP DRIVE. -PJSM WITH MAN RIDER PERMIT. -MAKE UP HOSE TO DRIVE AS PER DOYON SOP. 01:00 - 02:00 1.00 PULL P DECOMP PULL HANGER TO RIG FLOOR -PJSM. -SCREW INTO HANGER WITH LANDING JOINT-8-1/2 TURNS. -SCREW LANDING JOINT INTO TOP DRIVE. -PULL HANGER TO RIG FLOOR-PULLED AT 75K(125 TOTAL WEIGHT ON INDICATOR) Printed 12/28/2015 1:48:54PM • North America-ALASKA-BP Page 6 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Datefine:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code 1 NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 02:45 0.75 PULL P DECOMP CIRCULATE SURFACE TO SURFACE VOLUME. -CLOSE ANNULAR ON 4.5"TUBING AND OPEN HCR ON CHOKE. -SYSTEM LINED UP TO CIRCULATE THRU MUD GAS SEPARATOR. -BREAK CIRCULATION AND RAMP UP TO 6 BPM AT 400 PSI. -SHOWING LOSSES WHILE CIRCULATING, SLOW PUMPS DOWN TO 4.5 BPM AT 250 PSI. -LOSSES SLOWED DOWN. -CIRCULATED 220 BELS THRU MUD GAS SEPARATOR. -SHUT DOWN AND FLOWCHECK WELL FOR 10 MINUTES-WELL ON VACUUM. *SIM-OPS:BRING SPOOLER AND CASING HANDLING EQUIPMENT UP TO RIG FLOOR AND RIG UP. **40 BBLS LOST DURING CIRCULATION. 02:45 - 04:00 1.25 PULL P DECOMP BLOW DOWN ALL LINES. -PJSM. -BLOW DOWN ALL LINES. -R/U CONTROL LINE SPOOLER AND 4-1/2" HANDLING EQUIPMENT. -LINE UP TO FILL HOLE FOR TRIP OUT. 04:00 - 10:00 6.00 PULL P DECOMP POOH WITH 4-1/2"12.6#L-80 TUBING F/CUT @ 5954'MD T/3798'MD -PJSM WITH DDI CASING,SLB SPOOLER AND RIG CREW. -L/D TUBING W/DUAL CONTROL LINE -50 STAINLESS STEEL BANDS RECOVERED -PUW=100KLBS,SOW=95KLBS 10:00 - 11:00 1.00 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR -REMOVE TBG HANGER,CONTROL LINE SPOOLER,AND ASSOCIATED EQUIPMENT -ALL CONTROL LINE AND TOOLS REMOVED F/WELL,NORMED(0 READING) 11:00 - 12:00 1.00 PULL P DECOMP CONTINUE T/POOH W/4-1/2"12.6#L-80 TUBING F/3798'MD T/3075'MD -PUW=85KLBS,SOW=83KLBS FLUID LOSSES @ NOON=72BBLS OA PRESSURE @ NOON=0 PSI 9.8PPG MW IN AND OUT 12:00 - 16:00 4.00 PULL P DECOMP CONTINUE T/POOH W/4-1/2"12.6#L-80 TUBING F/3075'MD T/SURFACE -RECOVERED 144 FULL JNTS,1 CUT JNT (4.34'),1 GLM,1 SSSV,3 PUP JNTS (CALCULATED TBG STUMP=5987.15'MD) -FLARE ON TUBING CUT=4.938"OD 16:00 - 17:30 1.50 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR -L/D CSG TOOLS,CLEAN PARAFFIN F/RIG FLOOR -MOBILIZE BAKER FISHING SPEAR BHA#1 T/ RIG FLOOR -SIMOPS:LOAD AND STRAP 4-3/4"DRILL COLLARS IN PIPE SHED Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 7 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 18:30 1.00 W-ISUR P DECOMP INSTALL WEAR RING -RIG UP AND PREPARE TO INSTALL WEAR RING -DRAIN STACK -OBSERVE SS BAND IN BLIND/SHEAR RAM CAVITY AND FISH OUT -FUNCTION ALL RAMS INSTALL 9 1/16"ID WEAR RING 18:30 - 21:00 2.50 PULL P DECOMP PICKUP AND RUN IN THE HOLE WITH BHA#1, SPEAR ASSEMBLY -TO 349'MD -SPEAR DRESSED W/3.947"NOMINAL CATCH GRAPPLE -PICK UP(9)4 3/4"DRILL COLLARS -STEAM AND CLEAR ICE FROM ALL 9 COLLARS TO DRIFT. 21:00 - 22:00 1.00 PULL P DECOMP PRESSURE TEST KELLY HOSE TO CONFIRM LEAK-TIGHT -PJSM WITH RIG CREW -BREAK CIRCULATION AND FLUID PACK MUD LINES -CLOSE IBOP AND PRESSURE UP ON KELLY HOSE TO 3500 PSI -VERIFY LEAK-TIGHT AT CONNECTIONS THAT WERE BROKEN -BLEED OFF PRESSURE AND BLOW DOWN TOP DRIVE. 22:00 - 00:00 2.00 PULL P DECOMP RUN IN THE HOLE WITH BHA#1,SPEAR ASSEMBLY,PICKING DRILL PIPE SINGLES FROM THE PIPE SHED -FROM 349'MD TO 1266'MD 12/2/2015 00:00 - 04:30 4.50 PULL P DECOMP CONTINUE TO RUN IN THE HOLE WITH BHA #1,SPEAR ASSEMBLY,PICKING DRILL PIPE SINGLES FROM THE PIPE SHED -FROM 1266'MD TO 5785'MD. -PU 142K;SO 132 04:30 - 07:00 2.50 PULL P DECOMP SLIP AND CUT 50'OF DRILL LINE -INSPECT SAVER SUB -CALIBRATE BLOCK HEIGHTS -SERVICE AND INSPECT TOP DRIVE 07:00 - 09:00 2.00 PULL P DECOMP ESTABLISH PARAMETERS;RUN IN THE HOLE AND ENGAGE TUBING STUB WITH SPEAR AT 5997'MD -SPR:MW 9.8 PPG IN/OUT;5785'MD -MP#1:30/40 SPM;400/700 PSI;MP#2:30/40 SPM;420/740 PSI -CIRCULATE A DRILL PIPE VOLUME:6 BPM; 1555 PSI -RUN IN THE HOLE FROM 5785'MD TO 5980' MD -PU 147K;SO 137K -ENGAGE TUBING STUB WITH SPEAR AT 5997'MD AND SET DOWN 5K TO ENGAGE SPEAR -VERIFY GOOD LATCH ON FISH:PICK UP 5K AND PRESSURE UP TO 1000 PSI -WORK FISH WITH 1000 PSI PUMP PRESSURE AND 10-40K OVERPULL 2 TIMES -FISH PULLED FREE -CIRCULATE AT 3 BM;400 PSI AND WORK STRING:PU 180K;SO 155K Printed 12/28/2015 1:48:54PM • S North America-ALASKA-BP Page 8 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisburne Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor DOYON DRILLING INC. UW:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 11:30 2.50 PULL P DECOMP CIRCULATE THE HOLE CLEAN -5 BPM;900 PSI -PUMP 40 BBL HI-VIS SWEEP -141 BBLS INTO CIRCULATION OBSERVED INCREASE OF GAS IN RETURNS CLOSED ANNULAR AND CONTINUED TO CIRCULATE THE WELL OUT THROUGH THE GAS BUSTER AS AN OPERATIONAL PRECAUTION. -4 BPM;740 PSI -INCREASED RATE TO 6 BPM;1700 PSI -MONITOR WELL;NO FLOW CIRCULATE A BOTTOMS UP -7 BPM;1900 PSI -MONITOR WELL;WELL LOSING FLUID--1-2 BPH. -BLOW DOWN TOP DRIVE AND CHOKE MANIFOLD CIRCULATED OUT 3-4 BBLS OF SAND. 11:30 - 12:00 0.50 PULL P DECOMP PULL OUT OF THE HOLE WITH FISH -FROM 5940'MD TO 5586'MD -PU 178K;SO 153K 12:00 - 12:30 0.50 PULL P DECOMP SERVICE TOP DRIVE,BLOCKS AND D RAW WORKS 12:30 - 15:00 2.50 PULL P DECOMP CONTINUE TO PULL OUT OF THE HOLE WITH BHA#1,SPEAR ASSY AND FISH -FROM 5586'MD TO 412'MD SIMOPS: -MOBILIZE TOOLS AND EQUIPMENT TO THE RIG FLOOR FOR LAYING DOWN TUBING. 15:00 - 17:00 2.00 PULL P DECOMP LAY DOWN BHA -PJSM WITH RIG CREWAND BAKER FISHING REPRESENTATIVE -MONITOR WELL FOR 10 MIN;2 BPH STATIC LOSS RATE -STAND BACK 4 3/4"DRILL COLLARS -LAY DOWN REMAINDER OF BHA#1 AND CUT JOINT WITH SPEAR ENGAGED. 17:00 - 20:00 3.00 PULL P DECOMP PULL AND LAY DOWN 4 1/2",12.6#/FT IBT TUBING -RECOVERED 57 FULL JOINTS,2 GLMS AND 2 CUT JOINTS -TOP CUT JOINT:36.36' -BOTTOM CUT JOINT:7.85' 20:00 - 21:30 1.50 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR -RIG DOWN TUBING HANDLING EQUIPMENT -ATTEMPT TO REMOVE SPEAR FROM TOP CUT JOINT 21:30 - 22:00 0.50 WHSUR P DECOMP REMOVE WEAR RING AND FLUSH STACK -PULL WEAR RING -MAKE UP STACK FLUSHER AND FLUSH STACK;9.3 BPM;50 PSI,100 RPM -BLOW DOWN TOP DRIVE Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 9 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:OOAM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.1ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 00:00 2.00 BOPSUR P DECOMP INSTALL TEST PLUG AND PRESSURE TEST ANNULAR WITH 4"TEST JOINT -INSTALL TEST PLUG AND RIG UP TEST EQUIPMENT -PRESSURE TEST ANNULAR TO 300/3500 PSI FOR 5 CHARTED MIN EACH -GOOD TEST -RIG DOWN TEST EQUIPMENT -PULL TEST PLUG AND INSTALL 9 1/16"ID WEAR RING. 12/3/2015 00:00 - 00:30 0.50 BOPSUR P DECOMP INSTALL 9 1/16"WEAR RING AND RUN IN LOCK DOWNS. 00:30 - 03:00 2.50 PULL P DECOMP PICK UP AND RUN IN THE HOLE WITH 7"HES RTTS ON DRILL PIPE STANDS OUT OF THE DERRICK -TO 4220'MD -PU 114K;SO 112K 03:00 - 03:30 0.50 PULL P DECOMP CIRCULATE A BOTTOMS UP -6 BPM;350 PSI 03:30 - 05:00 1.50 PULL P DECOMP SET RTTS AND PRESSURE TEST CASING TO 3500 PSI -SET HES RTTS; -RIG UP TEST EQUIPMENT -PRESSURE TEST CASING 300 PSI LOW FOR 5 CHARTED MIN-GOOD TEST -PRESSURE TEST CASING TO 3500 PSI HIG FOR 30 CHARTED MIN -LOST 70 PSI IN THE FIRST 15 MIN. -LOST 20 PSI OVER THE SECOND 15 MIN. -2 BBLS TO PRESSURE UP;2 BBLS BLED BACK -GOOD TEST;MEETS BP INTEGRITY REQUIREMENTS -SEE TEST CHART AND CRITERIA CALCULATOR ATTACHED -DISCUSS TEST WITH BP SUPERINTENDENT AND RECEIVE ATP -RIG DOWN AND BLOW DOWN TEST EQUIPMENT 05:00 - 07:00 2.00 PULL P DECOMP RELEASE RTTS AND PULL OUT OF THE HOLE, STANDING BACK DRILL PIPE -RELEASE RTTS PER HES PROCEDURE -MONITOR WELL;STATIC LOSS RATE—1 BPH -PULL OUT OF THE HOLE FROM 4220'MD, STANDING BACK DRILL PIPE 07:00 - 08:00 1.00 FISH P DECOMP HANDLE BHA -LAY DOWN 7"HES RTTS -PREP RIG FLOOR AND MOBILIZE BHA COMPONENTS FOR NEXT RUN TO RIG FLOOR. Printed 12/28/2015 1:48:54PM North America-ALASKA-BP Page 10 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 IEnd Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UW:500292288500 Active datum:L2-11 OKB(ii250.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 12:00 4.00 FISH P DECOMP MAKE UP AND RUN IN THE HOLE WITH BHA #2,6 1/8"PACKER MILL ASSY PCIKING UP DRILL PIPE FROM THE PIPE SHED -MAKE UP MILLING BHA PER BAKER FISHING REPRESENTATIVE TO 313'MD -RUN IN THE HOLE,PICKING UP DRILL PIPE, TO 2781'MD -PU 103K;SO 101K -CONTINUE TO RUN IN THE HOLE ON DRILL PIPE STANDS OUT OF THE DERRICK -FROM 2781'MD TO 4110'MD -PU 118K;SO 115K 12:00 - 12:30 0.50 FISH P DECOMP SERVICE TOP DRIVE,DRAWWORKS AND BLOCKS 12:30 - 14:00 1.50 FISH P DECOMP CONTINUE TO RUN IN THE HOLE WITH BHA #2,PACKER MILL ASSY -FROM 4110'MD TO 8285'MD -PU 192K;SO 160K _ 14:00 - 14:30 0.50 FISH P DECOMP ESTABLISH PARAMETERS AND WASH DOWN TO TUBING STUB AT 8405'MD -PU 192K;SO 160K;ROT 175K;20 RPM;3-4K TORQUE -40 RPM;4-5K TORQUE -5 BPM;610 PSI -WASH DOWN FROM 8285'MD AND TAG TUBING STUB AT 8405'MD WITH 3K -PICK UP AND BEGIN MILLING ON PUP JT AND PACKER 14:30 - 00:00 9.50 FISH P DECOMP MILL ON PUP JOINT AND PACKER -FROM 8405'MD TO 8409'MD -VARY PARAMETERS AND DRY MILL FOR SHORT PERIODS OF TIME -3-5 BPM;350-690 PSI -40-100 RPM;3-9K TORQUE -5-20K WOB -SMALL AMOUNTS OF RUBBER OBSERVED AT SHAKERS AT 22:00 HRS 12/4/2015 00:00 - 06:00 6.00 FISH P DECOMP CONTINUE MILLING ON PACKER FROM 8409' MD TO 8411'MD -VARY PARAMETERS AND DRY MILL FOR SHORT PERIODS OF TIME -3-5 BPM;350-690 PSI -40-100 RPM;3-9K TORQUE -5-20K WOB -PUMP 28 BBL HI-VIS SWEEP AT 04:30 -SIGNIFICANT AMOUNT OF METAL CUTTINGS RETURNED WITH SWEEP -PU 192K;SO 160K;RTW 175K -CONTINUE TO MILL,DRY MILL AND BEAT DOWN ON PACKER Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 11 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 FISH P DECOMP CONTINUE MILLING ON PACKER WITH SAME PARAMETERS -DRY MILL FOR 20 MIN ATATIME FROM 8411' MD TO 8412'MD -PICK UP AND CIRCULATE 10 BBLS BETWEEN EACH INCREMENT -WEIGHT ON MILL=1-20K -BEAT DOWN ON PACKER WITH 20K AND STACK UP TO 35K ON PACKER 5 TIMES -NO SIGNIFICANT PROGRESS MADE -DISCUSS WITH ANCHORAGE TEAM -CIRCULATE 30 BBL HI-VIS SWEEP WHILE MILLING ON PACKER -NO METAL OR RUBBER RETURNED WITH SWEEP. -DECISION MADE TO PULL OUT OF THE HOLE AND CHECK MILL 12:00 - 12:30 0.50 FISH P DECOMP MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM;WELL ON SLIGHT LOSSES-1 BPH BLOW DOWN TOP DRIVE 12:30 - 14:00 1.50 FISH P DECOMP PULL OUT OF THE HOLE WITH BHA#2, PACKER MILL ASSY FROM 8411'MD TO 6490'MD -PU 165K;SO 136K 14:00 - 14:30 0.50 FISH P DECOMP SERVICE TOP DRIVE,DRAWWORKS AND IRON ROUGHNECK 14:30 - 17:00 2.50 FISH P DECOMP CONTINUE PULLING OUT OF THE HOLE WITH BHA#2,PACKER MILL ASSY -FROM 6490'MD TO 375'MD 17:00 - 18:00 1.00 FISH P DECOMP PULL BHA#2,PACKER MILL ASSY AND LAY DOWN MILL -MONITOR WELL FOR 10 MIN PRIOR TO PULLING BHA THROUGH STACK;-1 BPH LOSS RATE -STAND BACK COLLARS AND LAY DOWN BOOT BASKETS AND MILL -MILL IS WORN OUT;EDGES ARE ROUNDED AND CUT-RIGHT IS WORN DOWN. -SEE ATTACHED PHOTOS 18:00 - 19:00 1.00 FISH P DECOMP CLEAN BOOT BASKETS -RECOVERED 25 LBS OF METAL SHAVINGS -SEVERAL SLIP DIES FROM PACKER IN BOOT BASKETS -RECOVERED SEVERAL PIECES OF A SS BAND IN BOOT BASKETS -SEE ATTACHED PHOTOS -MOBILIZE NEW MILL FOR BHA#3 TO RIG FLOOR 19:00 - 19:30 0.50 FISH P DECOMP PICK UP AND RUN IN THE HOLE WITH BHA#3, PACKER MILL ASSY TO 313' -SAME AS BHA#2 WITH NEW PACKER MILL. 19:30 - 23:00 3.50 FISH P DECOMP RUN IN THE HOLE WITH BHA#3,PACKER MILL ASSY ON STANDS OF 4"DRILL PIPE OUT OF THE DERRICK -FROM 313'MD TO 8380'MD Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 12 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 FISH P DECOMP ESTABLISH MILLING PARAMETERS,WASH DOWN AND MILL ON PACKER -SPR:9.8 PPG MW IN/OUT AT 8380'MD -MP#1:30/40 SPM;190/350 PSI -MP#2:30/40 SPM;190/350 PSI -PU 195K;SO 155K;ROT 175K;100 RPM;5-6K TORQUE -190 PSI @ 3 BPM;350 PSI @ 4 BPM -WASH DOWN AND TAG AT 8409'MD;SET DOWN 4K -PICK UP AND COME BACK DOWN;TAG AT 8410'MD WITH 4K -BEGIN MILLING ON PACKER AT 8410'MD WITH 100 RPM;7-9K TORQUE;2-5K WOM 12/5/2015 00:00 - 07:00 7.00 FISH P DECOMP CONTINUE TO MILL ON PACKER VARYING PARAMETERS -FROM 8410'MD TO 8417'MD -PU 192K;SO 160K;ROT 175K;100 RPM; 7-10K TORQUE -4 BPM;400 PSI -1-15K WOM -DRY MILLED ON PACKER FOR 40 MIN WITH 2-10K WOM FROM 8413'TO 8414' -CIRCULATED 30 BBL HI-VIS SWEEP;MILL TORQUED UP AS SWEEP ROUNDED THE MILL. -FINE METAL CUTTINGS WITH SWEEP AT SURFACE -CONTINUE MILLING ON PACKER WITH 100 RPM AND 10-15K WOM TO 8417'MD 07:00 - 08:30 1.50 FISH P DECOMP CIRCULATE ANOTHER 30 BBL HI-VIS SWEEP -8 BPM;1240 PSI;60 RPM;K TORQUE OFF BOTTOM -METAL CUTTINGS RETURNED WITH SWEEP AT SURFACE -TAG FISH WITHOUT PUMPS OR ROTATION AT 8417'MD WITH 7K DOWN PU 195K;SO 160K 08:30 - 09:00 0.50 FISH P DECOMP MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM;—1 BPH LOSS RATE BLOW DOWN TOP DRIVE 09:00 - 12:00 3.00 FISH P DECOMP PULL OUT OF THE HOLE AND LAY DOWN BHA #3,PACKER MILL ASSY -FROM 8417'MD TO SURFACE 12:00 - 13:00 1.00 FISH P DECOMP BREAK DOWN BHA#3 AND CLEAN BOOT BASKETS -RECOVERED 40 LBS OF METAL SHAVINGS 13:00 - 13:30 0.50 FISH P DECOMP MAKE BHA#4,SPEAR ASSY,AND RUN IN THE HOLE -MOBILIZE SPEAR TO RIG FLOOR -TO312'MD 13:30 - 17:00 3.50 FISH P DECOMP CONTINUE TO RUN IN THE HOLE WITH BHA #4,SPEAR ASSY,ON 4"DRILL PIPE STANDS OUT OF THE DERRICK -FROM 312'MD TO 8383'MD -PU 195K;SO 155K 17:00 - 19:30 2.50 FISH P DECOMP SLIP AND CUT 65'OF DRILL LINE -INSPECT SAVER SUB -CALIBRATE BLOCK HEIGHTS -SERVICE AND INSPECT TOP DRIVE Printed 12/28/2015 1:48:54PM • North America-ALASKA-BP Page 13 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UW:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 20:00 0.50 FISH P DECOMP ESTABLISH PARAMETERS;RUN IN THE HOLE AND ENGAGE FISH WITH SPEAR AT 8417'MD -SPR:MW 9.8 PPG IN/OUT;8383'MD -MP#1:30/40 SPM;270/490 PSI; -MP#2:30/40 SPM;280/480 PSI -RUN IN THE HOLE FROM 8383'MD TO 8410' MD -PU 195K;SO 155K -ENGAGE FISH WITH SPEAR AT 8417'MD AND SET DOWN 10K TO ENGAGE SPEAR -PICK UP 20';NEW PU 198K(3K INCREASE). -COME DOWN AND VERIFY FISH,TAG AT 4817'WITH 10K -PICK UP 25';PU=198K -MONITOR WELL FOR 10 MIN;LOSS RATE<1 BPH -BLOW DOWN TOP DRIVE. 20:00 - 00:00 4.00 FISH P DECOMP PULL OUT OF THE HOLE WITH BHA#4, SPEAR ASSY,AND FISH -FROM 8390'TO 312'MD -PU 68K;SO 68K -MONITOR WELL FOR 10 MIN PRIOR TO NON-SHEARABLES;LOSS RATE<1 BPH 12/6/2015 00:00 - 01:00 1.00 FISH P DECOMP PULL OUT OF THE HOLE,STANDING BACK DRILL COLLARS,AND LAY DOWN FISH AND SPEAR ASSY. -FROM 312'TO SURFACE -STAND BACK DRILL COLLARS IN DERRICK -LAY DOWN SPEAR ASSY -CUT AND LAY DOWN FISH -RECOVERED(2)20'PUP JTS,(1)10'PUP JT,(1)'X'NIPPLE AND(1)WLEG -TOTAL LENGTH OF FISH RECOVERED= 47.87' THE BAKER S-3 PACKER WAS COMPLETELY MILLED UP ALONG WITH 3.61'OF THE FIRST PUP JT BELOW THE PACKER THE MULE SHOE ON THE WLEG WAS GOUGED ON THE TIP WHERE IT APPEARS IT WAS SHOVED INTO THE LINER TOP AT 8468' MD. THERE ARE NO SIGNS OF ROTATION ON THE WLEG. SEE ATTACHED PHOTOS. 01:00 - 02:00 1.00 FISH P DECOMP CLEAN AND CLEAR RIG FLOOR;CLEAR FLOOR OF BHA#4 COMPONENTS AND MOBILIZE BHA#5 COMPONENTS TO RIG FLOOR BLOW DOWN CHOKE MANIFOLD ROLL HOLE-FILL ACROSS THE TOP;HOLE IS STATIC. 02:00 - 03:30 1.50 FISH P DECOMP PICK UP AND RUN IN THE HOLE WITH BHA#5, POLISH MILL ASSY,TO 343'MD -PICK UP POLISH MILL ASSY,BOOT BASKETS,MAGNETS,JARS AND COLLARS PER BAKER FISHING REP. -BHA OAL=343.43' -PU 70K;SO 70K 03:30 - 05:30 2.00 FISH P DECOMP RUN IN THE HOLE WITH BHA#5,POLISH MILL ASSY,ON 4"DRILL PIPE STANDS OUT OF THE DERRICK -FROM 343'MD TO 8410'MD PU 200K;SO 160K Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 14 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 07:00 1.50 FISH P DECOMP ESTABLISH PARAMETERS AND DRESS OFF LINER TOP AT 8465'MD -SPR:9.8 PPG MW IN/OUT;8410'MD -MP#1:30/40 SPM;140/300 PSI -MP#2:30/40 SPM;160/320 PSI -PU 200K;SO 160K;ROT 177K;30 RPM;5.5K TORQUE -5 BPM;510 PSI -WASH DOWN FROM 8410'MD AND TAG TOP OF LINER AT 8465'MD -SET DOWN 10K TO VERIFY LINER TOP -DRESS OFF LINER TOP PER BAKER FISHING REPRESENTATIVE -50 RPM;5-7K TORQUE -DRESS OFF LINER TOP UNTIL NO EXCESS TORQUE OR DRAG OBSERVED 07:00 - 08:00 1.00 FISH P DECOMP PUMP 30 BBL HI-VIS SWEEP AT 8 BPM;1290 PSI -SIGNIFICANT AMOUNT OF METAL RECOVERED WITH SWEEP. 08:00 - 08:30 0.50 FISH P DECOMP MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM;WELL STATIC BLOW DOWN TOP DRIVE DRIFT STRING FOR LINER RUN WITH 2 3/8" OD DRIFT 08:30 - 10:00 1.50 FISH P DECOMP PULL OUT OF THE HOLE WITH BHA#5, POLISH MILL ASSY,STANDING BACK DRILL PIPE IN DERRICK -FROM 8465'MD TO 4234'MD -PU 125K;SO 120K 10:00 - 12:00 2.00 FISH P DECOMP CONTINUE TO PULL OUT OF THE HOLE WITH BHA#5,POLISH MILL ASSY,LAYING DOWN DRILL PIPE -FROM 4234'MD TO 3021'MD -PU 107K;SO 104K 12:00 - 12:30 0.50 FISH P DECOMP SERVICE AND INSPECT DRAWWORKS AND _SKATE 12:30 - 15:00 2.50 FISH P DECOMP CONTINUE TO PULL OUT OF THE HOLE WITH BHA#5,POLISH MILL ASSY,LAYING DOWN DRILL PIPE -FROM 3021'MD TO 343'MD. 15:00 - 16:00 1.00 FISH P DECOMP PULL AND LAY DOWN BHA#5,POLISH MILL ASSY -MONITOR WELL FOR 10 MIN PRIOR TO PULLING BHA THROUGH STACK;STATIC -LAY DOWN DRILL COLLARS AND BHA -STRING MAGNETS HAD SIGNIFICANT AMOUNT OF METAL 16:00 - 17:00 1.00 FISH P DECOMP CLEAN AND CLEAR RIG FLOOR OF BHA COMPONENTS -CLEAN BOOT BASKETS;RECOVERED 10 LBS OF METAL 17:00 - 19:30 2.50 WHSUR P DECOMP PULL WEAR RING AND INSTALL TEST PLUG -FLUSH BOP STACK;14 BPM -DRAIN STACK -PULL WEAR RING -INSTALL TEST PLUG -RIG UP TO IA TO FILL WHILE TESTING -FILL STACK AND LINES AND PURGE AIR FROM SYSTEM -RIG UP BOPE TEST EQUIPMENT Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 15 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/me:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 00:00 4.50 BOPSUB P DECOMP PRESSURE TEST ALL BOPE AS PER AOGCC REGS,SUNDRY#315-596,AND GP 10-45. -PJSM,REVIEW DDI SOP AND PRESSURE CROSSCHECK WITH CONFIRMATION OF CORRECT RESPONSES. -TEST BOPE TO 300/3500 PSI FOR 5/5 CHARTED MIN. -TEST ANNULAR TO 300/3500 PSI FOR 5/5 CHARTED MIN. -TEST BLOWOUT PREVENTERS AND ALL ASSOCIATED BOPE. -UPPER 3-1/2"X 6"VBRs TESTED WITH 3 1/2" AND 4-1/2"TEST JOINT. -LOWER 2-7/8"X 5"VBRs TESTED WITH 2 7/8",3-1/2"AND 4 1/2"TEST JOINT. -ANNULAR PREVENTER TESTED WITH 2 7/8" TEST JOINT. -TEST CHOKE MANIFOLD VALVES,CHOKE AND KILL HCR VALVES. -TEST MANUAL AND HYDRAULIC IBOP'S ON TOP DRIVE. -PERFORM DRAW DOWN TEST OF ACCUMULATOR. -FUNCTION BOPE FROM REMOTE PANEL AND MAIN UNIT. -ALL TESTS WITNESSED BY TOOLPUSHER AND WSL. *AOGCC GIVEN NOTIFICATION OF BOPE TEST 12/05/2015 @ 22:16 HRS. *AOGCC INSPECTOR CHUCK SCHEVE WAIVED WITNESS 12/7/2015 00:00 - 02:30 2.50 BOPSUB P DECOMP CONTINUE TO PRESSURE TEST ALL BOPE AS PER AOGCC REGS,SUNDRY#315-596,AND GP 10-45. -TEST BOPE TO 300/3500 PSI FOR 5/5 CHARTED MIN. -TEST ANNULAR TO 300/3500 PSI FOR 5/5 CHARTED MIN. -TEST BLOWOUT PREVENTERS AND ALL ASSOCIATED BOPE. -UPPER 3-1/2"X 6"VBRs TESTED WITH 4" AND 5-1/2"TEST JOINT. -LOWER 2-7/8"X 5"VBRs TESTED WITH 4" TEST JOINT. -BLIND/SHEAR RAMS TESTED. -TEST CHOKE MANIFOLD VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES. -TEST FLOOR AND DART VALVES. -TEST MAN ADJ/SUPER CHOKE=1500 PSI/ 5 MIN -FUNCTION BOPE FROM REMOTE PANEL AND MAIN UNIT. -ALL TESTS WITNESSED BY TOOLPUSHER AND WSL. *AOGCC GIVEN NOTIFICATION OF BOPE TEST 12/05/2015 @ 22:16 HRS. *AOGCC INSPECTOR CHUCK SCHEVE WAIVED WITNESS Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 16 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 03:30 1.00 BOPSUB P DECOMP BLOW DOWN AND RIG DOWN BOPE TEST EQUIPMENT -DRAIN BOPE STACK -PULL TEST PLUG -INSTALL 9 1/16"ID WEAR RING 03:30 - 05:30 2.00 TIEBAC P OTHCMP RIG UP TO RUN 5 1/2",17#/FT,L80,TCII SCAB LINER -RIG UP DOUBLE STACK TONGS AND TORQUE TURN EQUIPMENT -MOBILIZE 5 1/2"HANDLING EQUIPMENT TO RIG FLOOR. 05:30 - 23:00 17.50 TIEBAC P OTHCMP PICK UP AND RUN IN THE HOLE WITH 5-1/2", 17#/FT,L80,TCII SCAB LINER TO 4245'MD -PICK UP AND BAKER-LOK BAKER SEAL ASSY,PORTED FLOAT AND LANDING COLLAR ASSEMBLIES -JET LUBE SEAL GUARD ON ALL OTHER CONNECTIONS -TORQUE-TURN ALL CONNECTIONS -MAKE UP TORQUE FOR 5 1/2"TCII CONNECTIONS:6500 FT-LBS-MAX -90 FPM MAX RUNNING SPEED -RECORD PU AND SO WEIGHTS EVERY 10 JTS -FILL LINER EVERY 5 JOINTS -RUN 100 JTS PLUS SHOE TRACK ASSEMBLIES -BACK OUT AND LAY DOWN 6 JOINTS;BAD THREADS. -MAKE UP BAKER 5 1/2"x 7"HMC LINER HANGER AND HRD-E ZXPN LINER TOP PACKER ASSEMBLY(W/11.13'TBR) -VERIFY HMC LINER HANGER PINNED WITH 4 SHEAR SCREWS:—2966 PSI -FILL LINER TOP PACKER TBR WITH PAL MIX -PU 115K;SO 117K *OA OPEN TO BLEED TANK FOR PACK-OFF CHANGE OUT MONITORING AT 12:00 HRS. 23:00 - 00:00 1.00 TIEBAC P OTHCMP RUN IN THE HOLE WITH 5 1/2",17#/FT,L80, TCII SCAB LINER ON DRILL PIPE STANDS -FROM 4245'MD TO 5225'MD -MAKE UP FIRST STAND OF DRILL PIPE AND BREAK CIRCULATION -110 PSI @1 BPM;210 PSI @2 BPM;370 PSI @ 3 BPM -CONTINUE RUNNING IN THE HOLE ON STANDS OF DRILL PIPE FROM THE DERRICK -90 FPM MAX RUNNING SPEED -RECORD PU AND SO WEIGHTS EVERY 10 JTS -FILL DRILL PIPE EVERY 10 STANDS -PU 127K;SO 125KAT 5225'MD Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 17 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. F UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/8/2015 00:00 - 02:30 2.50 TIEBAC P OTHCMP CONTINUE TO RUN IN THE HOLE WITH 5 1/2", 17#/FT,L80,TCII SCAB LINER ON DRILL PIPE STANDS -FROM 5225'MD TO 8450'MD -90 FPM MAX RUNNING SPEED -RECORD PU AND SO WEIGHTS EVERY 10 JTS -FILL DRILL PIPE EVERY 10 STANDS -PU 183K;SO 160K 02:30 - 03:30 1.00 TIEBAC P OTHCMP PICKUP AND MAKE UP TD CEMENT SWIVEL AND PLUG DROPPING HEAD -PICK UP 25'PUP JOINT TO SPACE OUT -MAKE UP CEMENT HEAD AND SWIVEL TO 25'PUP JOINT -RIG UP CEMENT LINES AND CEMENT MANIFOLD ON RIG FLOOR 03:30 - 04:00 0.50 TIEBAC P OTHCMP ESTABLISH PARAMETERS AND RUN SEAL ASSEMBLY INTO TIE-BACK RECEPTACLE AT 8465'MD -PU 183K;SO 160K -1 BPM;110 PSI -TAG LINER TOP WITH SEAL ASSEMBLY AT 8465'MD WITH 10K -PICK UP 15'AND COME BACK DOWN -TAG LINER TOP WITH SEAL ASSEMBLY AT 8465'MD WITH 8K AND EASE SEAL ASSEMBLY INTO TIE-BACK RECEPTACLE -OBSERVE PRESSURE INCREASE TO 180 PSI AND SHUT OFF PUMPS -NO-GO WITH SEAL ASSEMBLY IN TIE-BACK RECEPTACLE AND SET DOWN 25K;MARK PIPE. -PICK UP TO UP WEIGHT+4'TO EXPOSE PORTS ON SEAL ASSEMBLY -ESTABLISH CIRCULATION THROUGH PORTS -110 PSI @ 1 BPM;500 PSI AT 3 BPM. 04:00 - 06:00 2.00 TIEBAC P OTHCMP CEMENT 5 1/2",17#/FT,L80,TCII LINER PER CADE -PJSM WITH RIG CREW,SLB CEMENTERS, BAKER,AND CH2 LEAD -REVIEWAND VERIFY PRESSURE CROSSCHECK CHECKLIST WITH CEMENTERS PRIOR TO PRESSURE TESTING LINES -PRESSURE TEST LINES 250/4500 PSI FOR 5 CHARTED MIN EACH. -BATCH UP 10.0 PPG MUDPUSH AND 15.3 PPG CEMENT -CEMENT LINER PER CADE 06:00 - 06:30 0.50 TIEBAC P OTHCMP CEMENT 5.5"SCAB LINER AS FOLLOWS: -15 BBLS OF 10 PPG MUDPUSH.AT 5 BPM -60 BBLS OF 15.3 PPG CEMENT. -PUMP 60 BBLS OF 15.3 PPG CLASS G 5.0 BPM,EXCESS VOLUME 20 BBLS (YIELD 1.31 CU.FT/SK) -DROP DART KICK OUT WITH 10 BBLS OF H20. -NO PIPE RECIPROCATION Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 18 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UW:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:30 - 07:00 0.50 TIEBAC P OTHCMP DISPLACE W/RIG PUMPS -DISPLACE WITH 9.8 PPG BRINE -REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP:FINAL CIRCULATING PRESSURE 1940 PSI -1253 STROKES TO BUMP PLUG @ 1940 PSI. -CHECK FLOATS,FLOATS HELD,CEMENT IN PLACE.AT 07:00 -ZERO LOSSES DURING CEMENT JOB 07:00 - 07:30 0.50 TIEBAC P OTHCMP SET LINER HANGER, -SET HANGER AS DIRECTED BY BAKER OIL TOOL REP -SET DOWN 25K ON SEAL UNTIL NO GO -PRESSURE UP T/3600 PSI. -S/O 40K SETTING HANGER. -PRESSURE UP T/4700 PSI. -P/U STRING WEIGHT TO RELEASE FROM HANGER. 07:30 - 08:00 0.50 TIEBAC P OTHCMP RIG DOWN CEMENT HOSES FROM CEMENT HEAD -LINE UP TO PUMP THROUGH TOP DRIVE. 08:00 - 09:00 1.00 TIEBAC P OTHCMP SET LINER TOP PACKER -SET PACKER AS DIRECTED BY BAKER REP P/U TO STRING WEIGHT -P/U 5'5/0 TAG. -L/T ROTATE 15 RPM. -S/O 50K SETTING PACKER -P/U STRING WEIGHT PRESSURE UP T/500 PSI. -UNSTING RUNNING TOOLS. -CIRC 50 BBLS @ 6 BPM,300 PSI. -P/U 30'AND CIRC CEMENT T/SURFACE. -18 BBLS CEMENT BACK TO SURFACE -PUW=110K,SOW=107K 09:00 - 09:30 0.50 TIEBAC P OTHCMP CIRCULATE BOTTOMS UP -8 BPM,500 PSI -9.8 PPG BRINE 09:30 - 10:00 0.50 TIEBAC P OTHCMP MONITOR WELL -WELL STATIC. -BREAK OUT OF TOP DRIVE. -P/U SINGLE ON TOP OS STAND#44. 10:00 - 11:30 1.50 TIEBAC P OTHCMP POOH F/4172'MD,T/SURFACE -MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. 11:30 - 12:00 0.50 TIEBAC P OTHCMP L/D RUNNING TOOL AS PER BOT REP -BAKER REP INSPECTED LINER RUNNING TOOL FOR WEAR OR MISSING SEGMENTS -CLEAN AND CLEAR RIG FLOOR. 12:00 - 14:00 2.00 TIEBAC P OTHCMP REMOVE WEAR RING -PJSM. -FLUSH STACK 14 BPM. -REMOVE CASING EQUIPMENT FROM RIG FLOOR. -MOBILIZE PACK OFF RUNNING TOOL AND PACK TO RIG RIG FLOOR. Printed 12/28/2015 1:48:54PM • North America-ALASKA-BP Page 19 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UW:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 17:00 3.00 TIEBAC P OTHCMP CHANGE OUT 7"MANDREL PACK OFF -REVIEW DOYON AND FMC PROCEDURE ON C/O PACK OFF -PULL PACK OFF THROUGH THE STACK -INSTALL NEW PACK OFF AND RILDS -PRESSURE TEST PACK OFF -300 PSI LOW-5 MIN CHARTED,3500 PSI HIGH-15 MIN CHARTED-TEST PASSED BP PRESSURE TEST CRITERIA(100218) CRITERIA 1B&3B -INSTALL WEAR RING-9-1/16"ID 17:00 - 00:00 7.00 TIEBAC P OTHCMP MAKE UP BHA#6,5.5"SHOE TRACK DRILL OUT BHA -PJSM FOR PICKING UP BHA -RU RONGS -MAKE UP BHAAS DIRECTED BY BOT REP TO 207' -4-3/4"INSERT BIT,4-3/4"STRING MILL, 3-1/8"OIL JARS,PUMP OUT SUB,2-7/8"PAC COLLARS,130 JNTS OF 2-7/8"PAC DP -TOTAL BHA LENGTH-4302.04' -SINGLE IN THE HOLE WITH 2-7/8"PAC FROM THE PIPE SHED F/ 207'TO 2,900' -PUW-80K,SOW-85K -MONITOR TRIP ON TRIP SHEET-CORRECT DISPLACEMENT OBSERVED. 12/9/2015 00:00 - 04:30 4.50 TIEBAC P OTHCMP SINGLE IN THE HOLE WITH 2-7/8"PAC FROM THE PIPE SHED F/ 2,900'TO 4,174'MD -PUW-98K,SOW-96K -MU XO FROM 2-7/8"PAC TO 4"DP -CIRCULATE AT 3 BPM,900 PSI,BD TOP DRIVE -9.8 PPG BRINE IN/OUT -RIH WITH BHA ON 4"DP FROM 4,174'TO 8,193'MD MONITOR TRIP ON TRIP SHEET-CORRECT DISPLACEMENT OBSERVED. - WASH DOWN FROM 8,193'TO 8,232'MD, TAG CEMENT WITH 5K DOWN 04:30 - 05:00 0.50 TIEBAC P OTHCMP CIRCULATE BOTTOMS UP -CIRCULATE BOTTOMS UP WITH 5 BPM,2320 PSI,OBSERVED CEMENT BACK AT BOTTOMS UP. -9.8 PPG BRINE IN/OUT 05:00 - 06:30 1.50 TIEBAC P OTHCMP PRESSURE TEST THE 7"BY 5-1/2"CASING STRING -PJSM FOR RIG UP AND PRESSURE TESTING OF THE CASING -PRESSURE TEST 7"X 5-1/2"CASING:BP PRESSURE TEST CRITERIA(100218)PASS FAIL CRITERIA 1 B AND 3B -300 PSI LOW 5 MIN,CHARTED-GOOD TEST -3500 PSI HIGH FOR 30 MIN,CHARTED- GOOD TEST -PRESSURE TEST VERIFIED BY WTL PRIOR TO PROCEEDING -SEE TEST CHART AND CRITERIA CALCULATOR UPLOAD 06:30 - 07:00 0.50 TIEBAC P OTHCMP BLOW DOWN CHOKE AND KILL LINES -TAKE SPR'S Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 20 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/me:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date NPT NPT Depth Phase Description of Operations (usft) 07:00 - 18:30 11.50 TIEBAC OTHCMP DRILL OUT CEMENT SHOE TRACK AND FLOAT EQUIPMENT WASH AND REAM CEMENT FROM 8,232'MD TO 8,352'MD -3 BPM W 880 PSI,1-4 K WOB,30-40 RPM, 2-4K TQ,1-2K FREE TQ, -9.8 PPG BRINE IN/OUT ZERO LOSSES -HARDER CEMENT ENCOUNTERED FROM 8,290'TO 8,352'MD -TAGGED UP ON THE TOP CEMENT PLUG AT 8,353' -MILLED CEMENT PLUGS FROM 8,353'TO 8,356'MD AT SAME PARAMETERS AS ABOVE. -TAGGED UP ON THE LANDING COLLAR AT 8,359'-ON DEPTH WITH TALLY -MILLED LANDING COLLAR FROM 8,359'TO 8,360'WITH: -3-8K WOB,40-60 K WOB,3-4K TQ 1 BPM,W/ 215 PSI -PUMPED 3 HIGH VIS SWEEPS WHILE DRILLING CEMENT AND FLOAT EQUIPMENT. OBSERVED RUBBER AND CEMENT BACK WITH BOTTOMS UP. -WORK STRING MILL PAST LANDING COLLAR DEPTH SEVERAL TIMES 18:30 - 22:00 3.50 TIEBACP OTHCMP DRILLED OUT CEMENT FROM 8,360'TO 8,441'MD,TAG FLOAT COLLAR AT 8,441'ON DEPTH TO TALLY. -3-5K WOB,40 RPM,3-4K TQ 4BPM,W/1400 PSI -9.8 PPG BRINE -PUMP 15 BBL HIGH VIS SWEEP -INCREASED CEMENT CUTTINGS OBSERVED AT BOTTOMS UP. 22:00 - 00:00 2.00 TIEBACP OTHCMP DRILL OUT FLOAT COLLAR FROM 8,441'MD TO 8,442'MD -2-7K WOB,40-50 RPM,3-5K TQ,2 BPM,600 PSI,3 BPM,1160 PSI,4 BPM,1860 PSI -PU W-163K,SOW-137K,ROT-150K -9.8 PPG BRINE 12/10/2015 00:00 P OTHCMP DRILL OUT FLOAT COLLAR AND CLEAN OUT TO ABOVE THE 5.5"SCAB LINER SEAL STEM ASSEMBLY -FROM 8,442'MD TO 8,460'(5'ABOVE TOP OF SEAL STEM ASSY) -2-7K WOB,40-50 RPM,3-5KTQ,2 BPM,600 PSI,3 BPM,1160 PSI,4 BPM,1860 PSI -PU W-163K,SOW-137K,ROT-150K -9.8 PPG BRINE -PUMP 25 BBL HIGH VIS SWEEP 0 . i TIEBACP OTHCMP CIRCULATE 1.5 BOTTOMS UP -CIRCULATE BOTTOMS UP AT 3-3/4 BPM WITH 1850 PSI,35 RPM ROTATE AND RECIPROCATE STRING 50' :40%INCREASE IN CEMENT CUTTINGS AND SMALL AMOUNTS OF FLOAT EQUIPMENT AT BOTTOMS UP -MONITOR WELL 10 MIN-WELL STATIC -9.8 PPG BRINE IN/OUT Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 21 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisburne Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UW:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 10:00 6.00 TIEBAC P OTHCMP POOH WITH CEMENT DRILL OUT ASSEMBLY# 5 -PJSM FOR POOH -PULL ONE STAND,BLOW DOWN TOP DRIVE -POOH FROM 8,360'MD TO 207'MD, -MONITOR TRIP ON TRIP TANK-HOLE TAKING CORRECT DISPLACEMENT. 10:00 - 11:00 1.00 TIEBAC P OTHCMP LAY DOWN BHA#6 -MONITOR WELL PRIOR TO PULLING BHA THRU THE STACK-WELL STATIC -PJSM FOR LAYING DOWN BHA: -LAY DOWN BHA AS DIRECTED BY BAKER REP. -BREAK&LD BIT- 11:00 - 20:00 9.00 CLEAN P OTHCMP PICKUP&MAKE UP BHA#7,JUNK MILL ASSEMBLY -PJSM FOR PICKING UP BHA. -MAKE UP BHA AS DIRECTED BY BOT REP TO 207' -3.70"JUNK MILL,STABILIZER,3.70"STRING MILL,PUMP OUT SUB,JARS, (6) 2-7/8"PAC COLLARS,222 JNTS OF 2-7/8"PAC DP,XO TO 4"DP -TOTAL BHA LENGTH-7201.35' -RIH W/BHA ON 2-7/8"PAC PIPE FROM THE DERRICK FROM 207'TO 4302'MD -SINGLE IN THE HOLE WITH 2-7/8"PAC FROM THE PIPE SHED F/ 4,302'MD TO 7,200' -PUMP STRING VOLUME TO ENSURE PAC PIPE IS FREE OF DEBRIS -2 BPM,1530 PSI,WITH 9.8 PPG BRINE -RIH ON 4"DP FROM DERRICK FROM 7,200' MD TO 8,339'MD -PUW-147K,SOW-120K -MONITOR TRIP ON TRIP SHEET-CORRECT DISPLACEMENT OBSERVED. 20:00 - 23:00 3.00 CLEAN P OTHCMP SLIP&CUT DRILLING LINE -PJSM FOR SLIP&CUT -INSPECT SAVER SUB AND TOP DRIVE -CALIBRATE BLOCK HEIGHT 23:00 - 00:00 1.00 CLEAN P OTHCMP CLEAN OUT TIE BACK SLEEVE -OBTAIN PARAMETERS:TAKE SPRS -WASH DOWN FROM 8,339'TO 8,460'TAG CEMENT W/5 K DOWN. -WASH&REAM CEMENT FROM 8,460'TO 8,475' -1-2K WOB,2 BPM,950 PSI,35 RPM,2-3K TQ. -SHUT DOWN ROTARY, - WASH DOWN FROM 8,475'&TAG CIBP AT 8,526' -PUW-153K,SOW-125K 12/11/2015 00:00 - 02:00 2.00 CLEAN P OTHCMP CIRCULATE SURFACE TO SURFACE. -WITH MILL TAGGED UP ON CIBP AT 8,526' MD -PUMP 25 BBL HIGH VIS SWEEP& CIRCULATE SURFACE TO SURFACE -ROTATE&RECIPROCATE PIPE 50' WHILE CIRCULATING -3 BPM,2100 PSI,35 RPM, -OBSERVED 20%INCREASE IN CEMENT& SAND AT BOTTOMS UP -9.8 PPG BRINE IN/OUT Printed 12/28/2015 1:48:54PM • North America-ALASKA-BP Page 22 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UN:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 06:30 4.50 CLEAN P OTHCMP MILLING OPERATIONS ON DEBRIS& CAST IRON BRIDGE PLUG AT 8,526'MD -MILL CIBP AT 8,526'WITH 1-2 K WOB,1.5-2 BPM,400-800 PSI,40-60 K RPM, -9.8 PPG BRINE. -DEBRIS ALONG SIDE OF MILL STALLING OUT THE ROTARY,WORK PIPE,ABLE TO WORK PIPE FREE WITH 25K OVERPULL -WORK DRILLSTRING UP AND DOWN IN ATTEMPT TO PUSH DEBRIS DOWN TO BE MILLED ON. -CONTINUE MILLING DEBRIS AND CIBP WITH SAME PARAMETERS AS ABOVE.FROM 8,526' MD TO 8,527'MD -OBSERVED LOSSES WITH CIBP PARTIALLY MILLED UP; -LINE UP FOR BULLHEAD OPERATIONS 06:30 - 08:30 2.00 CLEAN P OTHCMP BULL HEAD FLUID BELOW THE CIBP AT 8,527' -VERIFY CORRECT LINE UP FOR BULLHEAD OPERATIONS -PUMP DOWN DRILL STRING AND IA WITH 8.5 PPG SEAWATER,BULL HEADING 9.8 PPG BRINE -8 BPM TO CATCH FLUID,BULLHEAD AT 3.5 BPM WITH 2,960 PSI FINAL INJECTION PRESSURE -SHUT DOWN WITH 100 BBLS BULLHEADED AWAY -DISPLACE REMAINDER OF WELL TO 8.5 PPG SEAWATER -CIRCULATE SURFACE TO SURFACE UNTIL 8.5 PPG SEAWATER IN/OUT 08:30 - 15:30 7.00 CLEAN P OTHCMP CONTINUE MILLING CAST IRON BRIDGE PLUG AT 8,527'MD -TAKE NEW SPR'S WITH 8.5 PPG SEAWATER AT 8,527' -MILL CIBP WITH 2-3K WOB, 2 BPM,720 PSI, 40 RPM,2-3K TQ, -PUW-152K,SOW-125K,ROT-140K, -CHASE PLUG DOWN THE HOLE FROM 8,527' MD TO 11,347' -SET DOWN 5K,PU AND SET DOWN 10K,IN SAME SPOT. -PU OFF BOTTOM.—30' 15:30 - 18:00 2.50 CLEAN P OTHCMP CIRCULATE BOTTOMS UP WITH ANNULAR CLOSED THROUGH MUD GAS SEPARATOR -3 BPM,1640 PSI WITH 8.5 PPG SEAWATER THROUGH THE CHOKE AND MGS -8.5 PPG SEAWATER -SHUT DOWN&MONITOR WELL 10 MIN- STATIC LOSS RATE 2-3 BPH. -OBSERVED SOME BUBBLING IN THE BOP STACK AS FLUID LEVEL DROPPED Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 23 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UW:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To I lira Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 21:00 3.00 CLEAN P OTHCMP PULL OUT OF THE HOLE FROM 11,314'MD TO ^9,700' -OBSERVED 0.5 BBL LOSS IN THE FIRST 10 STANDS PULLED WITH NO BUBBLING -LINE UP AND BULL HEAD 4-1/2"TUBING VOLUME FROM THE MILL AT 9,700 TO THE BOTTOM OF PERF AT 11,260'MD -BULL HEAD 30 BBLS WITH 1 BPM-150 PSI,2 BPM-900 PSI,3 BPM-1450 PSI, 4 BPM,2000 PSI,FINAL BULL HEAD PRESSURE OF 1850 WITH 3.5 BPM -CIRCULATE BOTTOMS UP FROM 9,700' THROUGH THE CHOKE AND MUD GAS SEPARATOR -3 BPM,1600 PSI -SHUT DOWN VERIFY NO PRESSURE AND OPEN ANNULAR TO MONITOR THE WELL.- STATIC LOSS RATE AT 2-3 BPH. -SECURE WELL WITH TIW INSTALLED AND LINED UP ON THE TRIP TANK TO BE MONITORED 21:00 - 00:00 3.00 CLEAN N WAIT OTHCMP SAFETY STAND DOWN CALLED BY INCIDENT MANAGEMENT TEAM IN PRUDHOE -SAFETY STAND DOWN IMPLIMENTED DUE TO FAILED COMMUNICATIONS FIELD WIDE. -WELL SECURE AND BEING MONITORED ON TRIP TANK&CONTINUOUS HOLE FILL *AVG STATIC LOSS RATE AT 3 BBLS PER HOUR 12/12/2015 00:00 - 05:00 5.00 CLEAN N WAIT OTHCMP SAFETY STAND DOWN CALLED BY INCIDENT MANAGEMENT TEAM IN PRUDHOE -SAFETY STAND DOWN IMPLIMENTED DUE TO FAILED COMMUNICATIONS FIELD WIDE. -WELL SECURE AND BEING MONITORED ON TRIP TANK&CONTINUOUS HOLE FILL *AVG STATIC LOSS RATE AT 2-3 BBLS PER HOUR *RECIEVED APPROVAL FROM IMT TO RETURN TO WORK AT 05:00 05:00 - 17:00 12.00 CLEAN P OTHCMP POOH WITH JUNK MILL BHA#7 FROM 9,700' MD -PJSM FOR LD DP AND BHA -SHUT DOWN HOLE FILL&MONITOR WELL PRIOR TO PULLING OUT OF THE HOLE- STATIC LOSS RATE STILLAT2.5 BPH. -POOH LAYING DOWN DP SINGLES F/9700' T/7,232'TO THE PIPE SHED. -RU 2-7/8"HANDLING EQUIP. -LD 2-7/8"F/7,232'MD T/210.35'SINGLES TO THE PIPE SHED. -FLOW CHECK WELL PRIOR PULLING NON SHEARABLES THROUGH STACK-WELL IS STABLE -LD 3-1/8"DRILL COLLARS AND BHA -MONITOR TRIP ON TRIP TANK.-WELL LOOSING 2-3 BPH Printed 12/28/2015 1:48:54PM r North America-ALASKA-BP Page 24 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 18:00 1.00 CLEAN P OTHCMP CLEAN&CLEAR RIG FLOOR -PJSM -BEAVER SLIDE OPS -CLEAR RIG FLOOR OF BOT BHA&2-7/8" HANDLING EQUIPMENT 18:00 - 20:00 2.00 CLEAN P OTHCMP RIH WITH 4" DP STANDS FROM DERRICK (PIPE MANAGEMENT) -PJSM -RIH WITH DP FROM DERRICK T/1800'MD -POOH LAYING DOWN DP SINGLES TO THE PIPE SHED -MONITOR TRIP VOLUMES ON THE TRIP TAN K 20:00 - 22:00 2.00 CLEAN P OTHCMP CLEAR RIG FLOOR OF ALL 4-1/2"HANDLING EQUIPMENT -PJSM -BEAVER SLIDE OPS -REMOVE WEAR RING -MOBILIZE 3-1/2"AND 4-1/2"HANDLING EQUIPMENT TO RIG FLOOR FOR COMPLETION TUBING RUN -MAKE UP 3-1/2"TUBING XO TO TIW -ALIGN JEWLERY IN PIPE SHED 22:00 - 00:00 2.00 RUNCOM P RUNCMP RUN 4-1/2"12.6#,13CR-85 VAMTOP TUBING BY 3-1/2",9.2#13CR VAMTOP TUBING WITH A 5-1/2"X 3-1/2 HES TNT PACKER&TAIL PIPE ASSEMBLY. -PJSM:TOOL PUSHER,DRILLER,THIRD PARTY COMPLETION REP AND WSL VERIFIED PIPE COUNT&JEWLERY ALIGNMENT IN PIPE SHED DRILLER AND LEAD FLOOR HAND VERIFY CORRECT LIFTING EQUIPMENT SIZES -RUN 3-1/2",9.2#,13CR-85 VAMTOP COMPLETION FROM SURF TO 270' -TORQUE TURN ALL CONNECTIONS. -USE JET LUBE SEAL GUARD ON ALL SEALING AREAS. -BAKER LOCK ALL CONNECTIONS BELOW THE PACKER. -MAKE-UP TORQUE FOR 3-1/2"VAMTOP CONNECTIONS-2900FT-LBS. -90 FPM MAX RUNNING SPEED. -MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED WITH LOSSES STILL AT 2-3 BPH. Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 25 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 1X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:OOAM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 12/13/2015 00:00 - 05:30 5.50 RUNCOM P RUNCMP RUN 4-1/2"12.6#,13CR-85 VAMTOP TUBING BY 3-1/2",9.2#13CR VAMTOP TUBING WITH A 5-1/2"X 3-1/2 HES TNT PACKER&TAIL PIPE ASSEMBLY. -RUN 3-1/2",9.2#/FT,13CR-85 VAMTOP COMPLETION. -F/270 T/4,351' -PUW=87K SOW=86K -TORQUE TURN ALL CONNECTIONS. -USE JET LUBE SEAL GUARD ON ALL SEALING AREAS. -BAKER LOCK ALL CONNECTIONS BELOW THE PACKER. -MAKE-UP TORQUE FOR 3-1/2"VAMTOP CONNECTIONS-2900 FT/LBS. -90 FPM MAX RUNNING SPEED. -MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED -CHANGE OUT ELEVATORS TO 4-1/2"- VERIFIED BY DRILLER AND LEAD FLOOR HAND -DRESS POWER TONGS FOR 4-1/2" -MU 4-1/2"VT XO TO FOSV -MU 3-1/2"VT X 4-1/2'VT XO 05:30 - 11:00 5.50 RUNCOM P RUNCMP CONT RUN 4-1/2"12.6#,13CR-85 VAMTOP TUBING BY 3-1/2",9.2#13CR VAMTOP TUBING WITH A 5-1/2"X 3-1/2 HES TNT PACKER&TAIL PIPE ASSEMBLY. -RUN 4-1/2"12.6#,13 CR 85 VAMTOP COMPLETION -RUN IN F/4351' T/8456' -PUW=136K SOW=121K -TORQUE TURN ALL CONNECTIONS. -USE JET LUBE SEAL GUARD ON ALL SEALING AREAS. -BAKER LOCK ALL CONNECTIONS BELOW THE PACKER. -MAKE-UP TORQUE FOR 3-1/2"VAMTOP CONNECTIONS-4440 FT-LBS. -90 FPM MAX RUNNING SPEED. -MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED 11:00 - 12:00 1.00 RUNCOM P RUNCMP MU LANDING JOINT AND HANGER -CHANGED TO 4"DRILL PIPE ELEVATORS- VERIFIED BY DRILLER AND LEAD FLOOR HAND -PULL STRIPPING RUBBER/CATCHER -RIG DOWN XO FROM FOSV -MU LANDING JOINT AND HANGER 12:00 - 13:00 1.00 RUNCOM P RUNCMP LAND HANGER IN WELLHEAD -RUN IN AND LAND HANGER-VERIFIED BY FMC- -RIGGED UP ALL CIRCULATING LINES FOR CIRCULATING COMPLETION FLUIDS - PU 30'TO ALLOW FOR BETTER CIRCULATION. -PUW=136K FINAL SOW=121K Printed 12/28/2015 1:48:54PM • S North America-ALASKA-BP Page 26 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 15:00 2.00 RUNCOM P RUNCMP REVERSE CIRCULATE CORROSION INHIBITED SEAWATER PJSM FOR PUMPING CORROSION INHIBITED 8.6 PPG SEAWATER&DIESEL FREEZE PROTECT -PJSM WITH DDI FOR PUMPING OPERATIONS AND SETTING OF THE PACKER. -LINE UP PUMP 162 BBLS OF 110 DEG CORROSION INHIBITED 8.6 PPG SEAWATER DOWN IA -1 BPM-100 PSI -2 BPM-350 PSI -OPEN ANNULAR,CIRC 5 BBLS DOWN THE TUBING TAKING RETURNS UP THE ANNULUS -2BPM=160 PSI 15:00 - 17:30 2.50 RUNCOM P RUNCMP SET&TEST 5-1/2"X 3-1/2"HALLIBURTON TNT PACKER RUN HANGER BACK IN AND LAND AND PRESSURE TEST TUBING AND PACKER -LAND HANGER;FMC REPS RILDS AND TORQUE TO 500 FT-LBS,TORQUE GLAND NUTS TO 450 FT-LBS -FINAL PUW=136K FINAL SOW=121K -HES TNT PACKER AT 8177'MD -XN NIPPLE AT 8444'MD HAS RHC-M PLUG INSTALLED -NOTE: BAKER-LOK ALL CONNECTIONS BELOW THE PACKER -WITH LANDING JOINT INSTALLED-DROP BALL AND ROD 1-5/16"-PRESSURE UP AND SET PACKER PER HALLIBURTON PROCEDURE -PT TUBING 5 CHARTED MIN 300 PSI LOW/ 3500 PSI-30 CHARTED MINUTES HIGH PER THE RWO PROGRAM -GOOD TEST -BLEED PRESSURE TO 2000 PSI -PT PACKER 300 PSI LOW FOR 5 CHARTED MINUTES AND 3500 PSI HIGH FOR 30 CHARTED MINUTES-GOOD TEST -VERIFY TEST PASSES FOR BP CRITERIA (100218)PASS/FAIL CRITERIA 1B AND 2B -VERIFY COMPETENCY OF TEST WITH WTL PRIOR TO PROCEEDING -BLEED OFF PRESSURE SHEARING DCK VALVE,PUMP BOTH WAYS TO CONFIRM SHEAR Printed 12/28/2015 1:48:54PM • • North America-ALASKA-BP Page 27 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisburne Site:Lis DS 02 Rig Name/No.:DOYON 14 ( Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 21:30 4.00 RUNCOM P RUNCMP FREEZE PROTECT WITH 85 BBLS OF 80 DEG DIESEL -PJSM WITH DDI AND LRS-REVIEW PROCEDURES -REVIEW PRESSURE CROSS CHECK, CHECK LIST -PT LRS FREEZE PROTECT LINES 300 PSI LOW/4200 PSI HIGH FOR 5 MINUTES -PUMP 85 BBLS 80 DEGREE FREEZE PROTECT DOWN THE IA -2 BPM ICP=1000 PSI FCP=2 BPM @ 1500 PSI -SHUT IN LINE UP AND ALLOW DIESEL TO U-TUBE FOR 1 HOUR -DIESEL FREEZE PROTECT DOWN 2500'IN THE TUBING AND IA 21:30 - 23:00 1.50 RUNCOM P RUNCMP SET AND TEST TWC -RD LRS CIRCULATING LINES&LANDING JOINT -DRAIN THE STACK AND READY T-BAR FOR DRY ROD TWC -INSTALL TWC: -FMC REP TO DRY ROD IN THE 4"H TYPE TWC -PRESSURE TEST TWC FROM BELOW 300 LOW/3500 PSI HIGH FOR 5 MINUTES EACH WITH LITTLE RED SERVICE PUMP -TOOK 2.6 BBLS TO REACH MAX PRESSURE, BLEED OFF PRESSURE -PRESSURE TEST MEETS BP PRESSURE TEST CRITERIA(100218)NO FLOW PAST TWC AND PASSES CRITERIA 1B&28 23:00 - 00:00 1.00 RUNCOM P RUNCMP CLEAR RIG FLOOR -PJSM -CLEAR RIG FLOOR OF TOOLS NOT NEEDED FOR OPERATIONS -RIG DOWN LRS IN THE CELLAR 12/14/2015 00:00 - 06:00 6.00 BOPSUR P RUNCMP CHANGE OUT AND INSPECT PIPE RAM CAVITIES FOR RESIDUAL CEMENT -PJSM:BARRIERS FOR ND AND BOP RAM INSPECTION,RHC BALL&ROD ON SEAT WITH 8.5 PPG KWF,TESTED TWC -BLOW DOWN CHOKE AND KILL LINES -SUCK OUT FLUID FROM STACK -POWER DOWN THE ACCUMULATOR -OPEN UPPER PIPE RAMS/BLIND/SHEAR DOORS,CLEAN/INSPECT SEALS,TOP PLATES -CHANGE OUT LOWER PIPE RAMS FROM 2-7/8"X 5" TO 3-1/2"X 6"VBR'S -PJSM FOR RAM CHANGE:REVIEW DDI PROCEDURE AND DISCUSS RISKS& MITIGATION S FOR TASK Printed 12/28/2015 1:48:54PM • I North America-ALASKA-BP Page 28 of 28 Operation Summary Report Common Well Name:L2-11 AFE No Event Type:WORKOVER(WO) Start Date:11/27/2015 End Date:12/14/2015 X4-01215-E:(4,056,000.00) Project:Lisbume Site:Lis DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:12/14/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288500 Active datum:L2-11 OKB @50.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 BOPSUR P RUNCMP NIPPLE DOWN 13-5/8"BOP AND NIPPLE UP 4-1/16"TREE -SECURE BOPE TO STUMP FOR MOVE -CLEAR RIG FLOOR OF TUBULAR HANDLING EQUIPMENT -NIPPLE UP TREE&ADAPTER FLANGE -FMC REP TO PRESSURE TEST HANGER VOID AND SEALS TO 5000 PSI FOR 15 CHARTED MIN TEST MEETS PASSING CRITERIA FROM BP PRESSURE TESTING GP(100218) 18 AND 3A -FILL TREE WITH DIESEL AND 2 BOTTLES OF HEET -PRESSURE TEST TREE TO 250 LOW,5000 PSI HIGH PRESSURE TEST-5 MIN FOR A VISUAL LEAK TIGHT PASSING CRITERIA -RIG DOWN TESTING EQUIPMENT -SECURE TREE AND CELLAR PRESSURES ON TBG/IA/OA=0/0/0 PSI **RIG RELEASE AT 1200 HRS ON 12/14/2015 SWITCH TO P1-14 REPORTS RIG DOWN MOVE OFF WELL AND MOBILIZE RIG AND OTHER COMPONENTS TO PM1-14. Printed 12/28/2015 1:48:54PM • • co w Et 1 ± 0 0 2 § / - u = 2I \ o / \ \ \ § 0 § \ / 2 0 0 0 _ ) / 2 / 2 ( \ \ • / § » 0 / / ) / \ } ) CO 0 F5') > e o = _ O. CO 0 cn O E ) k \ \ co'15) \ ) ƒ 2 Kin 0 s 0 ) j \ . \ \ O 0 Z N .. E Emu . 0 ® J ƒ $ $ • ( f a ) » ) $ ) m ) I f ! / 2 _ - • 53 $ ° / \ \ _ y § 7 \ 5 i ' � � � « 4 t ] } \ , , ( ( w 0 ' wi ) ) \ \ 2 c • ■ ;-_- 3m \ \ E R. @ | 0 2 0 ) / e [ in •q / 2 / ms ms E iii E F, / ■ st - A 2 & # < 0 _ ° _ o0 0 03 � » \ 0 \ co G \ 0. N : J f CL § E f ® / \ 0 \ \ ! E 0 ( 00O ij / to) \ 0 \ m _ < § ( E / e / / { \ . \ & & m 0 § 0 12 0 0 < < m o } W 0 j w k \ \ < WI < _ = 0 0 M 2 & ( IX § ± / § § > e < o k % - _I ( ix \ . } ) \ \ Lu ( / / m \ o a a ; 0 0 CO 3 R ) CV - = | ( \ / ( •/ / / a CV 2 k % [ \ ~ O. ® E ƒ 0) — E u .. o 2 § \ e | k ) \ / / / � � \ , ( k ® � � % \ a \ � � � ° z 0 0_ ± 0 = ) 0 3 ƒ } ) k % ` a) 7 ` s o o o o o • a 2 r G 0 2 3 3 6 6 3 3 • II . c.4 ,_� � / / o / L <cm _ co / \ \ = 0 CO N co 4 $ / — 42y k \ � — oD - zz J � � � / Ji © ) ) / -- - o- E _ g ® z _ — Eo - LL / - = zpE e\toz ƒ \ck $ $ 22 / { \ E e ee E - z z \ / : ) ] \ CO \ ff / z \ CL 1. 1 ) / Ico! { _ § . . 5 & t } k _ / J ] E I / / 7 \ } / / { / / -02 o ) ; . / « ) ± 2 - _ - n ' \ / E _ .E o H _ ( | •£ - 7 ( - { - z a % _ = z E o o 2 \ 6 § o r ƒ E a. \ a, k \ ) ] ) k ■ , § E / 0 E oz 2z \ eE 3 ° % j } I2 )) \ LO § , = E a e .: c. g § = ,F- co - E{ k / \ , # t = ! k ( 2 § A a z s £ .. ma) - 0. P. ; ) 3 -- / 3f §H \ .1.- --- ,S3 ] Jf / ) - \« / `• \0 7 ) 3 \ _ x = - o C3 j — } ) \ ) o /» o ƒ/) k ° z Ui 4- - \ /{ ° | Cri > — rc- z \ _to z \ z z m al \ / ( .11 i / \ u u a N > k ( 2 > \ 0 a u = J Z o | \ \ \ \ 0 ) i 2 f = 7 = # [ \ § / } \ == ) . { ) } ) \ -0 $ » a. o 21 I ± G D « ° / ) ■ a = 2 2 E % e r 3 3 3 3 \ 3 $ ± TREE= ? SAFETY NOTES:WELL ANGLE>70°@ 9236'. VVELLHEAD= FMC GEN 5 L2-1 1 MAX DLS:18.7°@ 10527'.CHROME TBG ACTUATOR= BAKER OKB ELEV= 50.1' I LL BF BEV= KOP= 4022 a H9-5/8"FES ES CEMENTER Max Angle= 97°@ 9684' Datum PA)= NA H4-1/2"HES X NP,I)=3.813' Dratum TVD= 8800'SS 9-5/8"CSG,47#,L-80 BTRS,ID=8.68r --{ 3688' A —4-1/2"X 3-1/2'XO,D=2.992' 4-1/2"TBG, 12.6#,13CR-85 VAM TOP, 4121 ���---^^^���''' 4204' —7"X 5-1/2'BKR HRI3 E ZXFN LTP w/WC 0152 bpf,D=3.958" lL r HGR D=4.840" GAS LFT MANDRELS ST PA) I J DEV TYPE VLV LATCH PORT [GATE Minimum ID = 2.750" @ 8437' 4 4016 4011 10 KBG-2 DOME BK 16 12/22/15 3 6412 6192 26 KBG-2-9 DOME NT 16 12/22/15 3-1/2" HES XN NIPPLE 2 7611 7284 24 KBG-2-9 DMY INT 0 12/12/15 1 8073 7711 22 KBG-2-9 DAY NT 0 12/12/15 ' 8140' H3-1/2"HES XNIP,D=2.813' 21-4 8171' —{5-1/2"X 3-1/2"HES TNT PKR,D=2.88" 8208' 1-13-1/2"HES X NP,D=2.813" I I 843T —3-1/2"HES XN NP,ID=2.750" 5-1/2'SCAB LNR 17#,L-80 TCI,D=4.892" H 8475' TOP OF 4-1/2"LNR H 8468' --{ 8468' —7"X 5"ZXP LTP AND HMC LNR HGR w/BKR 3-1/2"TBG,9.2#,13-CR VAM TOP, — 8494' SEAL STEM STUNG N,ID=4283' .0087 bpf,D=2.992" .1....,..„._ J1 L 8488' —15"X 4-1/2'XO,D=3.938" I 7"CSG,26#,L-80 MOD,D=6.276" —j 8623` ` 8494' H3-1/2"HALF MULESHOE ID=2.992" —IELMD NOT LOGGED PERFORATION SUMMARY I 8790' —14-1/2"HES X NP,D=3.813" REF LOG:SPERRY-SUN DGR ON 06/24/97 ANGLE AT TOP PERF:94'@ 9760' ' I 9262' 1H4-112'HES X NP,D=3.813 J Note:Refer to Production DB for historical perf data 9377' A-1TOPOF CEMENT SIZE SPF NTERVAL Opn/Sqz SHOT SQZ ii 2-7/8" 4 9760-9930 O 06/27/982-7/8" 4 9950-10070 O 06/27/98 ` SIDETRACKWINDOW 9453'-9475' 2-7/8" 4 10240-10546 O 06/27/981 2-7/8" 4 10566-10790 0 06/27/98 414. 144 4. ` 2-7l8" 4 11000- 11260 0 06/27/98 *. .1. 4141411♦ 4.444 444111• ' 1444444414141114 1441444144444411114 r. ( 11367' -T�TD1 1444444444444444444 rri►�i�. OPEN HOLE -{ 11041' 1.�.l�.l41441.A raaaaaa. raaaaaaaa, raaaaa aaa�. aaaaaaZaaav `aaaaaaaaa• 4-1/2"LNR,12.6#,L-80,.0152 bpf,ID=3.953" - 11484' sis aaaav aaaaV 'aaa* TD 1-- 11485' ! `` DATE REV BY COMMENTS DATE REV BY COMMENTS LISBURNE INT 06/28/98 ORIGINAL COMPLETION WELL L2-11 12/14/15 1-14 RWO PEFRIVIT No: 1980960 12/17/15 JIVE/ DRLG HO CORRECTIONSAPI No: 50-029-22885-00 12121/15 AW/JMD FINAL ODE APPROVAL SEC 18,T11N,R15E, 1432'FSL 8 1119'FML 01/11/16 SWC/JME GLV GO(12122115) BP Exploration(Alaska) ti OF Ty • • s� THE STATE Alaska Oil and Gas ,- A of Acc Conservati®n Commissi®n _ LAV 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 Op. ALA`aT Fax: 907.276.7542 CAMEO J c Ii:s www.aogcc.alaska.gov David Bjork Engineering Team Lead BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU L2-11 Sundry Number: 315-596 Dear Mr. Bjork: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster , ,, Chair DATED this h day of October, 2015 Encl. RBDMS )(i 'Ut,i 6 6 2015 STATE OF ALASKA , ',ALASKA OIL AND GAS CONSERVATION COMMI N APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing Q - Operations shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing Il - Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ •Repair Well p Re-enter Susp Well ❑ Other Scab Liner EI - 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 198-096 3. Address: P.O.Box 196612 Anchorage,AK Exploratory ❑ Development Q 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-22885-00-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? g Will planned perforations require a spacing exception? Yes III No El PBU L2-11 !.e ' 0 9. Property Designation(Lease Number): 10. Field/Pools: A; 3 2015 ADL 028321 - PRUDHOE BAY,PRUDHOE OIL ' 077 S !Q(SI I. 11. PRESENT WELL CONDITION SUMMARY lr,( Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 11485 8670 - 9263 8659 9263 None Casing Length Size MD TVD Burst collapse Structural Conductor 80 20" 38-118 38-118 Surface 3650 9-5/8" 38-3688 38-3688 6870 4760 Intermediate 8590 7" 36-8626 36-8210 7240 5410 Production Liner 3016 4-1/2" 8468-11484 6069-8670 Perforation Depth TVD(ft): TubingSize: Tubing Grade: Tubing MD(ft): Perforation Depth MD(ft): 9760-11260 8711 -8674 4-1/2",12.6# L-80 8466 Packers and SSSV Type: 4-1/2"Baker S-3 Packer Packers and SSSV MD(ft)and TVD(ft): 8410/8017 No SSSV Instated No SSSV Installed 12.Attachments: Description Summary of Proposal II 13.Well Class after proposed work: BOP Sketch II Detailed Operations Program ❑ Exploratory ❑ Stratigraphic LI Development El Service 0 14.Estimated Date for Commencing Operations: November 10,2015 15. Well Status after proposed work: Oil 0 ' Gas ❑ WDSPL ❑ Suspended 0 16.Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: Op Shutdown ❑ GSTOR 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Warren,Abigail M Email Abigail.Warren@bp.com Printed Name Dave Bjork Title Engineering Team Lead /f Signature �/ p — Phone +1 907 564 5683 Date Ug/t13//J COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: 315 - 5C to Plug Integrity ❑ BOP Test V Mechanical Integrity Test 0 Location Clearance ❑ Other: [3DP r - t to 3_FaC71,5-j (A417513 /3 32 ZO p 51 S ) �v1+,70,c,r prt✓ekt-Fe-,--,11-r-5 1 td 25-00 p5tj Spacing Exception Required? Yes 0 No Lel Subsequent Form Required: `v-4-e7 4- ‘./vAPPROVED BYTHE Approved by: COMMISSIONER COMMISSION Date:/fl ,s- /S-- V` L /0/71/5--- ORIGINAL RBDMSL UL 1 0 6 2015AI. Q Submit Form and Attachments in Duplicate Form 10-403 Revised 5/2015 Approved application is valid for 12 months from the date of approval. 2-9 _:l t) 04#10 • • Sundry Request for a casing repair Well: L2-11 Date: 9/22/2015 Engineer: Abby Warren MASP: 3220 psi _ ., Well Type: Producer Estimated Start date: November 10th, 2015 History: L2-11 is a 1998 horizontal sidetrack completed as a 4-1/2" monobore targeting Zone 1 in the up structure are of DS18. A tubing caliper was run in 2004 and showed the tuing to be in good condition with only one joint with an excess fo 20% penetration. A LDL in 2005 was run at found a leak at GLM#2. A 20'tubing patch was set in 2006 to restore intecgrity. A well test in 2008 then showed an increased water cut. A sample was taken and showed the possible presence of cretaceous water. An IBP was set at 9263' MD in 2008. The MIT-T passed to 3000 psi. In 2009 a CMIT-TxIA failed with a LLR 5 bpm @2200 psi. A LDL was then run and located the leak in the production ir- casing at 5650'-5700'. Scope of Work: The primary objective of the RWO is to fix the PC leak by running a 5-1/2" scab - liner. Pre Rig Prep Work: W 1 PPPOT-IC to 3500 psi, PPPOT-T to 5000 psi, Check all LDS for movement. S 2 Pull the tubing patch at 6298' MD. Pull the nipple reducer at 8440' MD, pull the 2-1/8" Baker IBP. Set a composite plug at 8515' MD (— mid joint in the first full joint below the LTP See attached 4.5" liner tally dated 6/23/98) F 3 CMIT-TxIA to 3500 psi (to compare leak rate before and after cut) MIT-OA to 1200 psi F 4 Cement control lines E 5 Perform power jet cut at 8409' MD. This depth corresponds to 2' above the bottom collar of the pup joint directly above the packer. The top of the packer according to the 6/24/98 tally is at 8407' MD (see attached tally) F 6 Circulate the wellbore at a max rate with 9.8 ppg brine (total volume of brine should be —430 bbls which is 1.5 of wellbore volume). FP well with diesel to 500'. Perform a post cut CMIT-TxIA to 3500 psi (to compare leak rate before and after the cut) ✓ 7 Set a BPV, ND the tree, NU the dry hole tree, PB IA and upper OA Valves O 8 Remove the well house&flow line. Level the pad as needed for the rig. Proposed RWO Procedure: • MIRU Doyon 14. • ND tree. NU and test BOPE with four preventers configured top down (annular, 3-1/2" x 6", blind shears, mud cross and 2-7/8" x 5"VBR's). Test the blind and VBR's to 3,500 psi and the annular to 3,500-psi. Pull TWC. • Pull the 4-1/2" tubing from the cut at—8409' MD • Mill and Retrieve the old production packer. • Perform a cleanout run and polish the tieback sleeve • Run 5-1/2" scab liner and fully cement with 40 bbls of 15.8 ppg Class G cement. • Change out IC packoff • Test wellbore to 3500 psi. • Drill up shoe trac and composite plug, push to PBTD • Run new 4.5" x 3.5" tubing 13Cr with 5-1/2" x 3-1/2" production packer • Set packer and MIT-T& MIT-IA to 3500 psi • Set a TWC and RDMO. Post ri Work ✓ 1 Pull the TWC S 2 Pull Ball and rod, and RHC. Set GLM design DWF - DirSurvey • • Page 1 of 5 Well Bore API/UWI Survey Type Company Name Survey Date MDT(ft) MDB (ft) Approved? L2-11 500292288500 COMP 0 11,485 Y L2-11PB1 500292288570 COMP 0 11,041 Y L2-11P82 500292288571 COMP 0 11,026 Y Any dogleg over 6 degrees/100 feet and angles over 70 degrees inclination are highlighted in red. Export To Excel MD(ft) TVD (ft) SS (ft) Inclination Azimuth Dog Leg OffsetX OffsetY GeoX GeoY 0 0.00 -50.10 0.00 0.00 0.0 0.0 0.0 692,817.7 5,963,328.4 155 155.24 105.14 0.04 18.82 0.0 0.0 0.0 692,817.7 5,963,328.5 239 238.51 188.41 0.56 127.61 0.7 0.4 -0.2 692,818.1 5,963,328.2 328 328.38 278.28 0.73 110.31 0.3 1.3 -0.6 692,819.0 5,963,327.8 418 417.77 367.67 0.95 98.81 0.3 2.5 -0.9 692,820.2 5,963,327.5 507 506.90 456.80 1.40 108.34 0.6 4.3 -1.3 692,822.0 5,963,327.1 596 595.50 545.40 1.02 109.76 0.4 6.1 -1.9 692,823.8 5,963,326.6 680 679.45 629.35 1.16 111.07 0.2 7.6 -2.4 692,825.3 5,963,326.0 711 710.53 660.43 1.24 100.75 0.7 8.2 -2.5 692,825.9 5,963,325.9 772 771.99 721.89 1.82 114.96 1.1 9.8 -3.0 692,827.5 5,963,325.4 802 801.84 751.74 2.09 102.98 1.6 10.7 -3.4 692,828.4 5,963,325.1 831 830.51 780.41 2.29 104.88 0.7 11.8 -3.6 692,829.5 5,963,324.8 860 859.96 809.86 2.27 105.35 0.1 12.9 -3.9 692,830.6 5,963,324.5 890 889.35 839.25 2.40 102.98 0.6 14.1 -4.1 692,831.8 5,963,324.3 921 920.73 870.63 2.72 102.91 1.0 15.5 -4.4 692,833.2 5,963,324.0 950 949.66 899.56 2.93 100.39 0.8 16.9 -4.7 692,834.6 5,963,323.8 980 979.51 929.41 3.52 105.29 2.2 18.6 -5.0 692,836.3 5,963,323.4 1,070 1,069.00 1,018.90 3.87 106.10 0.4 24.1 -6.4 692,841.8 5,963,322.0 1,166 1,165.54 1,115.44 4.30 109.24 0.5 30.8 -8.3 692,848.5 5,963,320.1 1,262 1,260.64 1,210.54 4.36 113.32 0.3 37.5 -10.8 692,855.2 5,963,317.6 1,357 1,355.87 1,305.77 4.57 111.23 0.3 44.5 -13.4 692,862.2 5,963,315.0 1,452 1,450.26 1,400.16 4.56 110.45 0.1 51.6 -15.9 692,869.3 5,963,312.5 1,484 1,481.95 1,431.85 4.35 114.54 1.2 53.9 -16.8 692,871.6 5,963,311.6 1,515 1,513.66 1,463.56 4.17 110.73 1.1 56.1 -17.7 692,873.8 5,963,310.7 1,547 1,545.08 1,494.98 3.99 112.45 0.7 58.2 -18.4 692,875.9 5,963,310.0 1,579 1,576.78 1,526.68 3.28 117.29 2.4 60.0 -19.2 692,877.7 5,963,309.2 1,611 1,608.51 1,558.41 2.90 114.82 1.3 61.6 -20.0 692,879.3 5,963,308.5 1,642 1,640.24 1,590.14 2.76 115.04 0.4 63.0 -20.6 692,880.7 5,963,307.8 1,673 1,670.96 1,620.86 2.40 117.50 1.2 64.3 -21.1 692,882.0 5,963,307.3 1,705 1,702.67 1,652.57 1.78 116.61 2.0 65.3 -21.6 692,883.0 5,963,306.8 1,738 1,735.65 1,685.55 1.58 127.15 1.1 66.2 -22.1 692,883.9 5,963,306.3 1,769 1,767.19 1,717.09 1.41 123.61 0.6 66.8 -22.6 692,884.5 5,963,305.9 1,801 1,798.91 1,748.81 1.08 131.72 1.2 67.4 -23.0 692,885.1 5,963,305.4 1,833 1,830.62 1,780.52 0.14 152.45 3.0 67.7 -23.2 692,885.4 5,963,305.2 1,928 1,925.59 1,875.49 0.51 314.38 0.7 67.4 -23.0 692,885.1 5,963,305.4 http://digitalwellfile.bpweb.bp.com/DirSurvey2/Home/Default.aspx 8/31/2015 DWF - DirSurvey • . Page 2 of 5 2,023 2,021.18 1,971.08 0.77 309.70 0.3 66.6 -22.3 692,884.3 5,963,306.1 2,121 2,119.07 2,068.97 0.87 306.91 0.1 65.5 -21.5 692,883.2 5,963,306.9 2,216 2,214.02 2,163.92 1.02 313.05 0.2 64.2 -20.5 692,881.9 5,963,307.9 2,248 2,245.37 2,195.27 0.52 307.68 1.6 63.9 -20.3 692,881.6 5,963,308.2 2,343 2,340.45 2,290.35 1.41 145.89 2.0 64.2 -20.9 692,881.9 5,963,307.5 2,438 2,435.47 2,385.37 0.48 209.89 1.3 64.7 -22.2 692,882.4 5,963,306.2 2,533 2,530.76 2,480.66 1.08 274.99 1.0 63.7 -22.5 692,881.4 5,963,305.9 2,628 2,626.00 2,575.90 1.29 258.46 0.4 61.7 -22.7 692,879.4 5,963,305.7 2,724 2,721.51 2,671.41 1.18 257.52 0.1 59.7 -23.2 692,877.4 5,963,305.2 2,819 2,816.65 2,766.55 0.70 74.74 2.0 59.3 -23.3 692,877.0 5,963,305.2 2,914 2,911.72 2,861.62 0.74 95.02 0.3 60.5 -23.1 692,878.2 5,963,305.3 3,009 3,007.02 2,956.92 0.79 99.75 0.1 61.7 -23.3 692,879.4 5,963,305.1 3,104 3,102.11 3,052.01 0.92 92.13 0.2 63.2 -23.4 692,880.9 5,963,305.0 3,200 3,197.48 3,147.38 1.28 105.03 0.5 65.0 -23.6 692,882.7 5,963,304.8 3,295 3,292.25 3,242.15 0.92 97.83 0.4 66.8 -24.0 692,884.5 5,963,304.5 3,390 3,387.77 3,337.67 1.16 113.32 0.4 68.4 -24.4 692,886.1 5,963,304.0 3,485 3,483.09 3,432.99 1.24 111.14 0.1 70.3 -25.1 692,888.0 5,963,303.3 3,581 3,578.36 3,528.26 0.29 254.10 1.6 71.0 -25.5 692,888.7 5,963,302.9 3,650 3,647.89 3,597.79 0.58 279.64 0.5 70.5 -25.5 692,888.2 5,963,302.9 3,706 3,703.65 3,653.55 0.38 273.89 0.4 70.0 -25.5 692,887.7 5,963,302.9 3,738 3,735.35 3,685.25 0.37 314.61 0.8 69.9 -25.4 692,887.6 5,963,303.0 3,769 3,766.72 3,716.62 2.80 340.23 7.9 69.5 -24.6 692,887.2 5,963,303.8 3,833 3,829.84 3,779.74 8.76 345.63 9.4 67.6 -18.6 692,885.3 5,963,309.9 3,928 3,923.65 3,873.55 9.69 348.17 1.1 63.8 -3.8 692,881.5 5,963,324.6 4,023 4,017.48 3,967.38 9.99 335.75 2.3 58.4 11.5 692,876.1 5,963,339.9 4,118 4,110.56 4,060.46 14.06 336.69 4.3 49.9 29.4 692,867.6 5,963,357.8 4,182 4,172.18 4,122.08 16.74 338.44 4.3 43.1 44.9 692,860.8 5,963,373.4 4,245 4,232.45 4,182.35 19.87 336.36 5.0 34.9 63.1 692,852.6 5,963,391.5 4,308 4,291.13 4,241.03 22.74 335.32 4.6 25.0 83.7 692,842.7 5,963,412.1 4,403 4,377.16 4,327.06 27.08 334.77 4.6 7.2 119.5 692,824.9 5,963,447.9 4,497 4,460.38 4,410.28 26.84 333.33 0.7 -12.3 157.1 692,805.4 5,963,485.5 4,593 4,546.70 4,496.60 26.67 335.49 1.0 -32.1 195.8 692,785.6 5,963,524.2 4,655 4,601.57 4,551.47 27.13 337.85 1.9 -43.8 221.1 692,773.9 5,963,549.5 4,720 4,659.75 4,609.65 27.02 344.60 4.7 -54.0 249.0 692,763.7 5,963,577.4 4,816 4,745.34 4,695.24 26.65 346.06 0.8 -66.1 290.5 692,751.6 5,963,618.9 4,911 4,830.70 4,780.60 25.86 346.66 0.9 -77.1 331.2 692,740.6 5,963,659.6 5,006 4,915.84 4,865.74 26.75 344.65 1.3 -88.6 371.7 692,729.2 5,963,700.1 5,101 5,000.88 4,950.78 26.60 344.13 0.3 -101.1 412.5 692,716.6 5,963,740.9 5,197 5,086.20 5,036.10 26.37 343.52 0.4 -114.0 453.0 692,703.7 5,963,781.4 5,292 5,172.32 5,122.22 24.78 342.28 1.8 -127.1 492.1 692,690.6 5,963,820.5 5,387 5,259.53 5,209.43 22.30 338.49 3.1 -140.7 527.6 692,677.0 5,963,856.0 5,483 5,347.93 5,297.83 22.43 336.41 0.8 -155.5 560.8 692,662.2 5,963,889.2 5,545 http://digitalwellfile.bpweb.bp.com/DirSurvey2/Home/Default.aspx 8/31/2015 DWF -DirSurvey • III Page 3 of 5 5,405.73 5,355.63 22.31 336.19 0.2 -165.6 582.3 I 692,652.1 5,963,910.7 5,641 5,494.40 5,444.30 22.39 335.88 0.2 -181.3 615.2 692,636.4 5,963,943.6 5,737 5,582.11 5,532.01 23.54 340.06 2.1 -196.1 649.3 692,621.6 5,963,977.7 5,768 5,611.01 5,560.91 23.92 340.12 1.2 -200.7 661.1 692,617.0 5,963,989.5 5,863 5,697.89 5,647.79 24.33 340.08 0.4 -214.9 697.3 692,602.8 5,964,025.7 5,958 5,784.22 5,734.12 25.46 339.74 1.2 -229.6 734.6 692,588.1 5,964,063.0 6,006 5,827.29 5,777.19 26.01 340.56 1.4 -237.1 754.0 692,580.6 5,964,082.4 6,149 5,955.47 5,905.37 26.04 339.81 0.2 -259.9 812.3 692,557.8 5,964,140.7 6,244 6,040.75 5,990.65 26.25 338.78 0.5 -275.7 851.1 692,542.0 5,964,179.5 6,339 6,125.96 6,075.86 26.41 339.61 0.4 -291.7 890.1 692,526.1 5,964,218.5 6,434 6,211.64 6,161.54 25.70 341.05 1.0 -306.8 929.1 692,510.9 5,964,257.5 6,530 6,297.89 6,247.79 26.04 340.52 0.4 -321.6 968.3 692,496.2 5,964,296.7 6,625 6,383.10 6,333.00 24.77 342.74 1.7 -335.3 1,006.3 692,482.4 5,964,334.7 6,720 6,469.89 6,419.79 24.53 343.03 0.3 -348.0 1,044.1 692,469.7 5,964,372.5 6,815 6,556.40 6,506.30 24.40 343.25 0.2 -360.4 1,081.4 692,457.3 5,964,409.8 6,910 6,643.25 6,593.15 23.87 342.66 0.6 -372.7 1,118.3 692,445.0 5,964,446.7 7,005 6,730.34 6,680.24 23.53 342.43 0.4 -385.1 1,154.5 692,432.6 5,964,482.9 7,101 6,817.86 6,767.76 23.18 342.01 0.4 -397.6 1,190.2 692,420.1 5,964,518.6 7,196 6,904.99 6,854.89 24.15 341.14 1.1 -410.6 1,226.1 692,407.1 5,964,554.5 7,291 6,991.92 6,941.82 24.30 340.36 0.4 -424.4 1,262.6 692,393.3 5,964,591.0 7,386 7,079.02 7,028.92 23.34 337.99 1.4 -439.0 1,298.2 692,378.7 5,964,626.6 7,482 7,166.23 7,116.13 24.26 337.00 1.1 -454.6 1,333.4 692,363.1 5,964,661.8 7,577 7,253.43 7,203.33 23.37 336.80 0.9 -470.6 1,368.4 692,347.1 5,964,696.8 7,672 7,340.79 7,290.69 24.02 339.69 1.4 -485.7 1,403.6 692,332.0 5,964,732.0 7,767 7,428.02 7,377.92 22.84 339.28 1.3 -499.9 1,438.6 692,317.8 5,964,767.1 7,862 7,515.55 7,465.45 21.61 340.31 1.4 -513.1 1,471.9 692,304.6 5,964,800.3 7,957 7,603.94 7,553.84 21.42 341.33 0.4 -525.4 1,504.5 692,292.3 5,964,832.9 8,051 7,691.16 7,641.06 21.78 339.43 0.8 -537.8 1,536.7 692,279.9 5,964,865.1 8,146 7,778.97 7,728.87 24.18 338.43 2.6 -552.1 1,571.1 692,265.6 5,964,899.5 8,242 7,865.95 7,815.85 24.28 340.03 0.7 -566.9 1,607.3 692,250.8 5,964,935.7 8,337 7,952.13 7,902.03 26.16 341.82 2.1 -581.1 1,645.3 692,236.6 5,964,973.7 8,432 8,036.94 7,986.84 28.05 343.32 2.1 -595.2 1,686.4 692,222.5 5,965,014.8 8,496 8,093.18 8,043.08 27.35 343.17 1.1 -604.4 1,714.4 692,213.3 5,965,042.8 8,589 8,176.91 8,126.81 26.14 344.33 1.4 -617.3 1,754.6 692,200.4 5,965,083.0 8,628 8,211.93 8,161.83 25.98 346.00 1.9 -622.1 1,771.0 692,195.6 5,965,099.5 8,661 8,241.00 8,190.90 25.88 350.90 6.6 -625.3 1,784.8 692,192.5 5,965,113.2 8,693 8,269.75 8,219.65 26.59 359.90 12.6 -626.7 1,798.9 692,191.0 5,965,127.3 8,725 8,298.35 8,248.25 28.01 8.33 12.8 -626.0 1,813.6 692,191.7 5,965,142.0 8,757 8,326.53 8,276.43 29.09 16.62 12.8 -623.1 1,828.6 692,194.6 5,965,157.0 8,789 8,354.50 8,304.40 30.45 25.37 14.1 -617.7 1,843.6 692,200.0 5,965,172.0 8,822 8,382.19 8,332.09 32.14 33.64 14.2 -609.8 1,858.4 692,207.9 5,965,186.8 8,852 8,407.82 8,357.72 34.64 39.36 13.1 -600.1 1,872.2 692,217.6 5,965,200.6 8,885 http://digitalwellfile.bpweb.bp.com/DirSurvey2/Home/Default.aspx 8/31/2015 DWF - DirSurvey • • Page 4 of 5 8,434.12 8,384.02 36.85 42.69 9.1 -588.1 1,886.8 692,229.7 5,965,215.2 8,917 8,459.68 8,409.58 38.66 46.16 8.6 -574.6 1,901.3 692,243.1 5,965,229.7 8,947 8,482.65 8,432.55 40.43 50.03 10.2 -560.8 1,914.3 692,256.9 5,965,242.7 8,979 8,506.60 8,456.50 43.12 54.27 12.1 -544.2 1,927.8 692,273.5 5,965,256.2 9,011 8,529.44 8,479.34 46.17 57.81 12.3 -525.8 1,940.8 692,291.9 5,965,269.2 9,043 8,551.09 8,500.99 49.03 61.68 12.6 -505.7 1,953.3 692,312.0 5,965,281.7 9,076 8,571.73 8,521.63 51.73 65.34 12.1 -483.7 1,964.9 692,334.1 5,965,293.4 9,108 8,590.76 8,540.66 55.30 67.90 12.9 -460.3 1,975.8 692,357.4 5,965,304.2 9,140 8,608.25 8,558.15 58.98 71.29 14.4 -435.2 1,985.9 692,382.5 5,965,314.3 9,172 8,623.81 8,573.71 62.88 74.00 14.2 -408.7 1,994.9 692,409.0 5,965,323.3 9,204 8,637.52 8,587.42 67.37 76.36 15.3 -380.3 2,003.1 692,437.4 5,965,331.6 9,236 8,649.28 8,599.18 69.56 79.62 11.7 -351.3 2,010.1 692,466.4 5,965,338.5 9,269 8,660.55 8,610.45 69.68 81.92 6.7 -321.5 2,015.7 692,496.2 5,965,344.1 9,301 8,671.19 8,621.09 71.69 83.94 8.6 -291.5 2,020.2 692,526.2 5,965,348.6 9,333 8,680.45 8,630.35 74.65 85.18 10.0 -261.2 2,023.9 692,556.6 5,965,352.3 9,365 8,688.20 8,638.10 77.56 86.11 9.4 -230.0 2,027.1 692,587.7 5,965,355.5 9,397 8,694.52 8,644.42 79.75 87.41 7.9 -198.6 2,029.7 692,619.1 5,965,358.1 9,430 8,699.47 8,649.37 82.59 88.48 9.4 -166.8 2,031.6 692,650.9 5,965,360.0 9,459 8,702.21 8,652.11 86.79 89.64 14.7 -137.3 2,032.9 692,680.4 5,965,361.3 9,491 8,704.86 8,654.76 83.74 89.00 9.7 -105.3 2,034.0 692,712.4 5,965,362.4 9,522 8,708.90 8,658.80 81.12 93.43 16.7 -74.9 2,034.2 692,742.8 5,965,362.6 9,554 8,714.02 8,663.92 80.47 95.93 8.0 -43.4 2,032.4 692,774.3 5,965,360.9 9,586 8,718.61 8,668.51 83.11 97.58 9.7 -11.7 2,029.5 692,806.0 5,965,357.9 9,618 8,721.29 8,671.19 87.35 99.54 14.5 20.1 2,025.5 692,837.8 5,965,354.0 9,652 8,721.34 8,671.24 92.47 101.64 16.5 53.3 2,020.2 692,871.0 5,965,348.6 9,684 8,718.75 8,668.65 96.87 101.41 13.9 84.5 2,014.7 692,902.2 5,965,343.1 9,716 8,714.90 8,664.80 96.85 100.67 2.3 116.0 2,009.4 692,933.7 5,965,337.8 9,748 8,711.82 8,661.72 94.25 101.71 8.8 147.3 2,004.0 692,965.0 5,965,332.4 9,779 8,709.71 8,659.61 93.48 101.75 2.5 178.0 1,998.5 692,995.7 5,965,326.9 9,811 8,708.70 8,658.60 90.09 101.64 10.5 209.8 1,992.7 693,027.5 5,965,321.1 9,844 8,708.64 8,658.54 90.12 101.84 0.6 241.6 1,987.0 693,059.3 5,965,315.4 9,876 8,708.36 8,658.26 90.89 103.34 5.3 273.1 1,980.7 693,090.8 5,965,309.2 9,908 8,707.57 8,657.47 91.91 102.73 3.7 304.7 1,974.3 693,122.4 5,965,302.7 9,940 8,706.11 8,656.01 93.26 103.49 4.8 336.3 1,967.8 693,154.0 5,965,296.2 9,973 8,704.57 8,654.47 92.22 102.70 4.1 367.9 1,961.3 693,185.6 5,965,289.7 10,005 8,704.03 8,653.93 89.72 102.87 7.8 399.3 1,955.0 693,217.0 5,965,283.4 10,037 8,704.25 8,654.15 89.51 103.49 2.0 431.0 1,948.4 693,248.7 5,965,276.8 10,069 8,704.64 8,654.54 89.07 103.34 1.5 462.1 1,941.8 693,279.8 5,965,270.2 10,101 8,704.56 8,654.46 91.23 103.13 6.8 493.5 1,935.3 693,311.2 5,965,263.7 10,133 8,703.58 8,653.48 92.25 102.94 3.2 525.2 1,928.8 693,342.9 5,965,257.2 10,167 8,702.25 8,652.15 92.31 103.20 0.8 558.0 1,922.1 693,375.7 5,965,250.5 10,198 8,701.08 8,650.98 92.00 102.44 2.6 588.5 1,916.0 693,406.2 5,965,244.4 10,231 http://digitalwellfile.bpweb.bp.com/DirSurvey2/Home/Default.aspx 8/31/2015 DWF - DirSurvey • • Page 5 of 5 8,699.79 8,649.69 92.50 103.00 2.3 620.8 1,909.5 693,438.5 5,965,237.9 10,262 8,698.73 8,648.63 91.36 102.29 4.3 651.6 1,903.5 693,469.3 5,965,231.9 10,295 8,698.14 8,648.04 90.74 102.59 2.1 683.3 1,897.3 693,501.0 5,965,225.7 10,327 8,697.81 8,647.71 90.43 102.77 1.1 714.8 1,891.1 693,532.5 5,965,219.5 10,359 8,697.71 8,647.61 89.91 102.86 1.6 746.5 1,884.7 693,564.2 5,965,213.1 10,391 8,697.80 8,647.70 89.78 103.17 1.0 778.0 1,878.3 693,595.7 5,965,206.7 10,424 8,698.01 8,647.91 89.48 102.66 1.8 809.7 1,871.9 693,627.4 5,965,200.3 10,456 8,698.39 8,648.29 89.17 102.36 1.3 841.3 1,865.7 693,659.0 5,965,194.1 10,488 8,698.92 8,648.82 88.95 102.33 0.7 872.9 1,859.6 693,690.6 5,965,188.0 10,520 8,699.56 8,649.46 88.77 102.70 1.3 904.4 1,853.5 693,722.1 5,965,181.9 10,522 8,699.60 8,649.50 88.78 102.68 1.1 906.3 1,853.1 693,724.0 5,965,181.5 10,527 8,699.71 8,649.61 88.74 103.64 18.7 911.3 1,852.1 693,729.0 5,965,180.5 10,559 8,700.01 8,649.91 90.18 102.14 6.5 942.9 1,845.7 693,760.6 5,965,174.1 10,591 8,699.19 8,649.09 92.77 100.98 8.9 974.4 1,840.1 693,792.1 5,965,168.5 10,626 8,697.16 8,647.06 93.94 98.78 7.2 1,008.7 1,835.0 693,826.4 5,965,163.4 10,657 8,694.97 8,644.87 94.19 95.33 11.2 1,039.3 1,832.0 693,857.0 5,965,160.4 10,689 8,692.82 8,642.72 93.57 95.20 2.0 1,071.0 1,829.9 693,888.7 5,965,158.3 10,720 8,691.06 8,640.96 92.80 93.88 4.8 1,102.6 1,828.2 693,920.3 5,965,156.6 10,753 8,689.70 8,639.60 92.07 95.58 5.8 1,134.6 1,826.4 693,952.3 5,965,154.8 10,785 8,688.95 8,638.85 90.58 95.79 4.6 1,166.9 1,824.0 693,984.6 5,965,152.4 10,816 8,688.82 8,638.72 89.91 94.43 4.9 1,198.0 1,822.0 694,015.7 5,965,150.4 10,848 8,689.06 8,638.96 89.20 94.90 2.7 1,229.3 1,820.3 694,047.0 5,965,148.7 10,881 8,688.85 8,638.75 91.51 94.81 7.0 1,262.5 1,818.3 694,080.2 5,965,146.7 10,913 8,687.22 8,637.12 94.28 93.25 9.8 1,294.7 1,816.9 694,112.4 5,965,145.3 10,945 8,684.25 8,634.15 96.38 94.18 7.2 1,326.5 1,815.6 694,144.2 5,965,144.0 10,977 8,680.58 8,630.48 96.57 94.18 0.6 1,358.8 1,814.1 694,176.5 5,965,142.5 11,010 8,676.87 8,626.77 96.72 94.29 0.6 1,390.6 1,812.6 694,208.3 5,965,141.0 11,041 8,674.01 8,623.91 93.69 95.26 10.1 1,421.9 1,810.8 694,239.6 5,965,139.2 11,074 8,672.77 8,622.67 90.59 96.28 9.8 1,454.9 1,808.3 694,272.6 5,965,136.7 11,106 8,673.36 8,623.26 87.29 96.29 10.3 1,486.8 1,805.6 694,304.5 5,965,134.0 11,138 8,675.06 8,624.96 86.67 96.50 2.0 1,518.8 1,802.8 694,336.5 5,965,131.2 11,171 8,676.95 8,626.85 86.61 97.49 3.1 1,550.7 1,799.7 694,368.4 5,965,128.2 11,203 8,677.34 8,627.24 92.00 97.79 16.8 1,582.6 1,796.3 694,400.3 5,965,124.7 11,235 8,675.87 8,625.77 93.23 97.44 4.0 1,614.5 1,792.9 694,432.2 5,965,121.3 11,267 8,673.63 8,623.53 94.83 97.29 5.1 1,646.1 1,789.6 694,463.8 5,965,118.0 11,299 8,670.88 8,620.78 95.02 97.07 0.9 1,677.8 1,786.4 694,495.5 5,965,114.9 11,330 8,668.20 8,618.10 94.63 96.85 1.4 1,709.4 1,783.4 694,527.1 5,965,111.8 11,362 8,666.67 8,616.57 90.86 97.19 11.9 1,741.1 1,780.3 694,558.8 5,965,108.7 11,394 8,666.75 8,616.65 88.86 97.47 6.3 1,772.9 1,777.0 694,590.6 5,965,105.5 11,425 8,667.71 8,617.61 87.63 97.68 4.0 1,803.9 1,773.8 694,621.6 5,965,102.2 11,485 8,670.17 8,620.07 87.63 97.68 0.0 1,863.1 1,767.3 694,680.8 5,965,095.7 http://digitalwellfile.bpweb.bp.com/DirSurvey2/Home/Default.aspx 8/31/2015 TREE_ ? VVELHEAD= FMC GEN 5 • S NOTES:WELL ANGLE>70°@ 9236'. ACTUATOR= BAKE2CI'fOpUS2q KVVU MAX DLS:18.7°@ 10527'. 'OKE.ELEV= 50.1' BF.REV= I f KOP= 4022 _Max Angle= 97"@ 9684' Datum MD= - -NA a 0 2188' H 9-5/8"HES ES CEMENTER Datum TVD= 8800'SS I I •— ^2,200' -14-1/2"I-ES'X',ID 3.813" 4-1/2",12 6,13Cr-85 VamTop,ID 4,100' 3.89s - 4,100' -I4-112"X 3-1/2"crossover 9-5/8"CSG,47#,L-80 BTRS,ID=8.681" - 3688' , 5-1/2",17#,L-80 TC-II,ID=4.892" H - 4,188' LI - ^8,271' -{3-1/2"I-ES'X',D=2.813" 1 -8,302' H5-1/2"X 3-1/2"HES'TNT PKR D 2.88" 13-1/2"9.2#13Cr VamTop, ID=2.997H -8,400' I-- U - — -8,336' -�3-1/2"I-ES'X'ID=2.813" I I — -8,398' H3-1/2"I-ES'XN ID=2.750" TOP OF4-1/2"LNR H 8468' L ^8,431' -13-1/2"WLEG 0 8468" --]7"X 5"ZXP LTP A AND FMC LNR HGR w/BKR ( ITEBACK SLV,D=4.063" 7"CSG,26#,L-80 MOD,D=6.276" -i 8623' 8488' H 5"X 4-1/2"XO,ID=3.938" 1— 8790' -14-1/2"HES X NP,D=3.813" PERFORATION SUMMARY REF LOG:SPERRY-SUN DGR ON 06/24/97 ANGLE AT TOP PERF:94'@ 9760' 1----19262' -14-1/2"HES X NP,ID=3.813" Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SOZ 2-7/8" 4 9760-9930 C 06/27/98 • . 9377' -I TOP OF CEMENT 2-7/8" 4 9950-10070 C 06/27/98 1 • 2-7/8" 4 10240-10546 C 06/27/98 ,A • 2-7/8" 4 10566-10790 C 06/27/98 1 SIDETRACK WINDOW 9453'-9475' 2-7/8" 4 11000-11260 C 06/27/98 111.1 1111. ►1111 . 111111♦ 1111111 ♦ 111111111, ►111111111 1111111111111111114 /11111111111111111• 11367' -PBTD .11111111111111111 .tii_ OPEN HOLE - 11041' :1�����1�� :=======` 4-1/2"LNR, 12.6#,L-80, .0152 bpf,ID=3.953" - 11484' "1/4WILIIIIIIMXV TD -I 11485' DATE REV BY COMMENTS DATE REV BY COMMENTS LISBURNE UNIT 06/28/98 ORIGINAL COMPLETION 12/08/14 JMD ®ITS TO WBS FROM TALLIES WELL: L2-11 08/11/01 RNITP CORRECTIONS PERMIT No:9980960 • 04/17/06 KSB/PAG XX PLUG FULLED(12/29/05) AIR No: 50-029-22885-00 05/31/06 CO/DTM TRII CORRECTION(6/13/04) SEC 18,T11 N,R15E, 1432'FSL 8 1119'FWL 06/08/07 RCT/PAG GLV C/O 12/04/08 TAF/PJC SET I BP(11/25/08) BP Exploration(Alaska) TREE_ ? III L2 11 S NOTES:WELL ANGLE>70*@ 9236'. WELLHEAD= FMC GEN 5 .ACTUATOR= BAKER C MAX DLS:18.T 10527'. OKB.ELEV= 50.1' I BF.ELEV= ROP= 4022' 2183' H 4-1/2"CA MCOFT D=3.813" Max Angle= 97°Q 9684' 0 Datum MD= NA 2188' H9-5/8"HES ES CEMENTER Datum ND= 8800'SS GAS LFT MANDREL S 9-5/8"CSG,47#,L-80 BTRS,ID=8.681" H 3688' ST MD DEV TYPE VLV LATCH PORT DATE I 1 3518 3516 1 KBG2-LS DOME INT 16 06/08/07 2 6318 6107 26 KBG2-LS *"DMY M 0 07/17/05 3 8339 7954 26 KBG2-LS DMY M 0 04/07/04 k; i= *"NOTE BKR KB STRADDLE OVER;CANT BE USED FOR GL 6298'-6333' 14-1/2"BKR KB STRADDLE PATCH,D=2.37" Minimum ID =2.313" @ 8440' 4-1/2" XX NIP REDUCER X- 8407' —17"X 4-1/2"BKR S-3 PKR,D=?? I 8440' -1 4-1/2"HES X NP,D=3.813" 8440' —I4-112"XX NP REDUCER,D=2.313" 4-1/2"TBG,12.6#,L-80,.0152 bpf,ID=3.958" —I 8462' I N 8462' H4-1/2"WLEG ELMD NOT LOGGED TOP OF 4-1/2"LNR 8468' CI kT\ 8468' 7"X 5'ZXP LW AND HMC LNR HGR w/BKR I 1 TIEBACK SLV,ID=4.063" 7"CSG,26#,L-80 MOD,ID=6.276" —I 8623' ' 8488' —15"X 4-1/2"XO,D=3.938" 8790' —14-1/2"HES X NP,D=3.813" PERFORATION SUNSAARY REF LOG:SPERRI'-SUV DGR ON 06/24/97 ANGLE AT TOP PERE:94°@ 9760' 9262' H4-1/2"HES X NP,ID=3.813" Note:Refer to Roduction DB for historical perf data 9263' —I2-1/8"BKR BP(11/25/08) SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 2-7/8" 4 9760-9930 C 06/27/98N ►4 9377' —I TOP OF CEMENT 2-7/8" 4 9950-10070 C 06/27/98 ►� 1. 2-7/8" 4 10240-10546 C 06/27/98 14 2-7/8" 4 10566-10790 C 06/27/98 11l %4SIDETRACK WINDOW 9453'-9475' 2-7/8" 4 11000-11260 C 06/27/98 11*1 t 'N1111. 111111. 1111111111 11.i1i..i1i0 ►111111111111111114 11367' —I PBTD 11111111/1111111i1 tom. ..1.444 .�� ga .. ... OPEN HOLE 11041' ���i��ini. 4-1/2"LNR,12.6#,L-80,.0152 bpf,ID=3.953" H 11484' 'ik-i►�k Nv ' V TD —I 11485' DATE REV BY COMMENTS DATE REV BY COMMENTS LISBURNE UNIT 06/28/98 ORIGINAL COMPLETION 12/08/14 JMD EDITS TO WBS FROM TALLES WELL L2-11 08/11/01 RN/TP CORRECTIONS PERMT No_ 1980960 04/17/06 KSB/PAG XX PLUG FULLED(12/29/05) AR No: 50-029-22885-00 05/31/06 CO/DTM TREE CORRECTION(6/13/04) SEC 18,T11 N,R15E,1432'FSL&1119'FWL 06/08/07 RCT/PAG GLV C/O 12/04/08 TAF/PJC SET I BP(11/25/08) BP Exploration(Alaska) • • • 8 41 ag :: ... ; 1 R 0 is ci i 5 a [nT IQ m in O K NU gil w le m w w o § J_ �g�g�(( GF J En w 0 d O :•? :•• :• :•• •u Q Q¢ S > o_ J x O Z O Z wa IIII Q m Y 0 m m F- Q F- �... m > CJ M7 N m n 0 1 •$ €LY ig i ix 1 11111 OgQ � 11111 o❑ In 6 333 § 3 w 6-- -0 o — a a N - �� w -0 2 0 & - x>_ a rn�z 0 K ` zv^i_ g� f } nJ a 41 Z aha 1 1 kb M24W Ins to 0 -N 3 7,1 21 R '„ rill Ike__!-- 1 II i i N. _:, 11 j A, Z PO II I I 11111011B ' cc 41 1 ( 1 1.llII mil 1 _. 0 J ♦ a a ! m8 ! 0 II II Ai II I �r • i N I - i 1! u ii " i Si i Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. / ~'2'- D ~¢ File Number of Well History File PAGES TO DELETE Complete RESCAN Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: .~ Poor Quality Original'- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED Logs of various kinds [] Other COMMENTS: Scanned by:~Mildred Daretha Nathan Lowell [] TO RE-SCAN Notes: Re-Scanned by: Bevedy Mildred Daretha Nathan Lowell Date: Is/ • • by BP Exploration (Alaska) Inc. � Attn: Well Integrity Coordinator, PRB -20 C :C4 Post Office Box 196612 Alaska 99519- 66120 S WWI° August 22, 2011 Mr. Tom Maunder D ® Alaska Oil and Gas Conservation Commission l� 1 333 West 7 Avenue C` Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPMA L2 ANINW ;i : E Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA L2 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Lisburne 02 Date: 7/7/2011 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft gal L2 -03A 1980620 500292146501 Top Plate NA NA NA NA NA L2 -06 1830470 500292093000 2" NA 2" NA 0.90 7/7/2011 L2 -07A 2040530 500292291001 14" NA 14" NA 8.50 6/30/2011 L2 -08A 1981400 500292176101 Top Plate NA NA NA NA NA L2 -10 1870850 500292174600 Top Plate NA NA NA NA NA L2 -11 1980960 500292288500 14" NA 14" NA 6.80 6/30/2011 L2 -13A 1980780 500292144001 Top Plate NA NA NA NA NA L2 -14B 2040950 500292175802 Top Plate NA NA NA NA NA L2 -16 1870970 500292175400 Top Plate NA NA NA NA NA L2 -18A 1981060 500292176601 Top Plate NA NA NA NA NA L2 -20 1851340 500292137600 Top Plate NA NA NA NA NA L2 -21A 2041040 500292148501 Top Plate NA NA NA NA NA L2 -24 1850900 500292134600 Top Plate NA NA NA NA NA L2 -25 1860060 500292152500 Top Plate NA NA NA NA NA L2 -26 1851040 500292135900 Top Plate NA NA NA NA NA 12 -28 1850350 500292129800 62" NA 62" NA 35.70 7/5/2011 L2 -29 1852970 500292150500 Top Plate NA NA NA NA NA L2 -30 1850090 500292127200 Top Plate NA NA NA NA NA L2 -32 1871370 500292177800 Top Plate NA NA NA NA NA L2 -33 1860220 500292153400 Top Plate NA NA NA NA NA Schlu~berger Alaska Data & Consulting Services 2525 Gambe115ireet, Suite 400 Mchorage, AK 99503-2838 ATTN: Beth Well ~~~~-~ ~ ~1 ~~ Job R Log Description Date BL NO. 5353 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Mchorage, AK 99501 Color CD osii i ios .. S y~r 4 a t; V-02 82WY-00018 MEM PRODUCTION PROFILE ' 07/27/09 1 ~ W-26A H•32 P2-29 B1JJ-00033 ANHY-00102 AYTU-00052 MEM PRODUCTION PROFILE ~ PRODUCTION PROFILE ~ L- INJECTION PROFILE ~'? -' 07/26lpg 07/25/09 08/02/09 1 1 1 7 1 1 L2-11 L2-06 P2-28 L-213 V-221 L-220 ANHY-00106 B69K-00007 AYTU•00051 82WY-00019 AXBo-00037 B1JJ-00035 LDL CROSS FL W CHECK - INJECTION PROPIIE C, -~ MEMINJECTIONPROFI E' MEM INJECTION PROFILE' - MEM INJECTION PROFILE ~ 08/04/09 07/31/09 08/01/09 07/29/08 07/28/09 07l30/09 1 1 1 1 7 1 1 1 1 1 1 1 07-22 AZCM-00036 PRODUCTION PROPILE 08/09109 1 1 04•02A AYS4A0091 USIT ~ 08/11/09 1 1 J-11A L1-09 X-28 AWLB-00029 AYS4-00089 A%BD-00026 USIT _ PRODU TION PROFILE _~ MEM INJECTION PROFILE U' 08/05/09 OB/08/09 OS/1~/09 7 1 1 1 1 ~ L2-O6 3-29/J-32 06-04A B3S~-00020 AP3~-00055 BSJN-00009 PRODUCTION PROFILE IBP SET RECORD W/CROSSGLOW ~ RST - 08/14/09 08/08/09 08@3/09 1 1 1~ 1 ~ ~ 15-498 B2NJ-00013 MCNL 07/15/09 1 1 03-328 08AKA0030 OH MWD/LWD EDIT 02/28/09 2 ~ G-148 AWJI-00043 MCNL 07/24/09 1 1 L2-13A AWJI•00036 MCNL O6/17/09 ~ 18•02B AWJI•00045 MCNL Q~ OB/77/09 1 ~ P7-OS AWLB-00032 RST 08/08l09 1 1 B-16A B2WV-00020 MCNL '~ 0 08/03/09 1 1 J-2D8 AXBD-00020 MCNL (REVISED) ~ - . ~ ;"L ' 04/12/09 ~ o~ cncc nrrunw~ enr_c ocn cu~r oo c~n.~~.~ .- ..~....~~~..,....~......~ ........ _"_" __ BP Exploralion (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. <~( ,~ ~ i J Y r{ I 1~„ ; .' „ n ,..... . . . ~ Alaska Oata 8 Consulting Services 2525 Gambell Slrest, Suue 400 Mchorage, AK 99503-2838 • ~ '~~! 01 /23/09 ~chtumberge Alaska Data & Consulting Services a(~ 2525 Gambell Street, Suite 400 ~as.~ Anchorage, AK 99503-2838 ~ (~ ATTN: Beth ~lJ ~Q G w/ PII l ~ .i„n ~e N0.5047 ~ dc:.~ - F".y ~ Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ~ .,., nne i.,finn n..,., o~ r..~..- nn H-35 11970840 PRODUCTION PROFILE 08/12/08 1 1 -11 12111927 IBP & CROSS-FLOW STP j 11/24/08 1 1 MPS-41 11966291 SCMT - '~ f 1/24/08 1 1 K-05C AWJB-00016 MEM PROD PROFILE CJ _ ~.5 12/29/08 1 1 14-17A AXOY-00010 MEM INJECTION PROFILE Q -~() t 01/15/09 1 1 F-33 ALYF-00010 CEMENT IMAGE LOG (p- '~'" 12!30/08 1 1 K-16AL2 AXIA-00009 MEM PROD PROFILE 0 - b J 01/10/09 1 1 01-29 AP3O-00011 USIT - ~ j 01/04/09 1 1 09-30 AY1M-00007 STATIC SPINNER &IBP --• L( 01/15/09 1 1 N-18A AZCM-00005 JEWELRY LOG/PRESS/TEMP 01/06/09 1 1 R-24 AY3J-00004 USIT 01/16/09 1 1 N-18A AWLB-00002 USIT 12/26/08 1 1 V-212 AXED-00010 MEM INJECTION PROFILE ~ 01/16/09 1 1 V-222 ALYF-00011 INJ PROFILElWFL .~ l~-~ 01/08/09 1 1 07-0$A AYOO-00009 USIT L 01/22/09 1 1 N-12 12014053 RST ) - 09/30/08 1 1 E-32B AXOY-00005 MCNL 11/18/08 1 1 P2-15A 11594511 SCMT (PDC) (REVISION 2) t )~,L? 06/15/07 1 B-27A 11999059 RST ®DI ~'35 + _ 11/07/08 1 1 12-37 40018138 OHM D/LWD EDIT _~C ~~' 11/07/08 2 1 N-18A OSAKA0037 OH MWD/LWD EDIT ~Q~ -- -~ 12/24/08 2 1 H-38 08AKA0031 OH MWD/LWD EDIT C 12/07/08 2 1 .- L 5- ~ -~-~ r~ewe ew~~w vr~wue ne~.or ~ o r a~aa17117~7 l117Y nG1 YI11Y117V VIVO \.Vr'T CAVI7 I V: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99505 n Date Delivered Alaska Data & Consulting Services 2525 Gambell Street, SUItA 400 Anchorage, AK 9 ~~3, ~ ~'~ ATTN: Beth t NF, ,fit Received by: <,~ w9 ~ ._.- ~ .;~ i 07/23/08 ~C~f~~~er~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well _Inh 8 N0.4786 ~~;~`~~~~ ~~~+ ~ .~ ~~UU Company: State of Alaska t7 Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ~ .... n.. ..~:.. WB-05 12021166 MEM SBHPS / 06/13/08 1 G-16 11982438 PRODUCTION P OFILE /_ a~ a 06/21/08 1 R-12 12034908 PRODUCTION PROFILE (may'' 07/14/08 1 1 01-03A 12017505 PRODUCTION PROFILE ~j " `(p 07/15/08 1 1 J-158 11970838 SCMT 07/17/08 1 1 01-23 12057631 PRODUCTION PROFILE - 07/16/08 1 1 B-18 12071875 LDL ~ U G 07/20/08 1 1 4-04/T-26 11999025 LDL ~ 07/12/08 1 1 J-14A 12066524 MCNL O (~ 05/25/08 1 1 G-15B 11963096 MCNL ~-(~(p ' 05/30/08 1 1 L3-19 11968944 RST ~~ - 06/07/08 1 1 L2-11 12014019 RST t 06/05/08 1 1 o~ CACG Arvw~n~u~ Cn~r n BP Exploration (Alaska) Inc. _ -~ .. v...".-M v,-~ vvr , ~^v„ , v. Petrotechnical Data Center LR2-1 900 E. Benson Bivd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Service 2525 Gambell Street, Suite 40 Anchorage, AK 99 3-2838 ~ ATTN: Beth J~`,_~_ Received by: • 10/30!07 ~~~~~~b~~~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth WPII _Inh ~! rvo~ ~ ~ zo~7 ~' ° `~ ~~ ~ I nn nacrrintinn -~'`"""""-'""""~' °""''' r)afp RI NO. 4349 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay, Endicott, Aurora, Milne Pt., Pt. Mac Cnlnr Cr1 L2-11 11686750 RST (y ~ 05/24/07 1 1 3-41/K-39 11813054 RST - 06/09/07 1 05-22A 11285946 MCNL >!t 10/19/06 1 1 P2-22 11649964 MCNL ~ 04I25I07 1 1 OWDW-SW 11211392 RST ($(o$ 04/20/06 1 1 W-213 40015198 OH MWD/LWD EDIT ~ 05129/07 2 1 YLtAJt AGKNVWLtU(at Ktla1Y1 f3Y SIGNING AND Kt1UKN1NCi UNE GUPY tAGFt U: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 - ~'' 900 E. Benson Blvd. Anchorage, Alaska 99508 q~ ~, , ~r Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-28 8 ATTN: Beth Received by: J • DIVISION OF OIL & GAS . SARAH PALIN, GOVERNOR ~~&~~ @, &߯~~ DEPARTMENT OF NATURAL RESOURCES 550 WEST 7TH AVENUE. SUITE BOO ANCHORAGE. ALASKA 99501-3560 PHONE: (907) 269-8800 FAX: (907) 269-8938 CERTIFIED MAIL RETURN RECEIPT REQUESTED April 12, 2007 &GANNED NOV 012007 Mark C. Weggeland GPMA Resource Manager BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, AK 99519-6612 Re: Request to Commingle Production from the Initial Participating Area with Lisburne Participating Area Production ~<ê:.~ ~\~a C.OSCoa-~.~C~ SE:.<t ~\~O <..a ~'-\ \ E . o \)"3> Dear Mr. Weggeland: By letter dated April 2, 2007, BP Exploration (Alaska) Inc. (BPXA), as Operator of the Initial Participating Area (lP A) within the Prudhoe Bay Unit (PBU), requested authorization to commingle a portion of the production from the IPA of the PBU with production from the Lisburne Participating Area (LP A) that is processed through the Lisburne Production Center (LPC). r-t" \~~-aC;~ Six IPA wells (L2-03A, L2-07A, L2-08A, L2-11, L2-13A, and L2-18A) located on the Lisburne L2 pad are currently connected to DS-18 by a pipeline and processed at FS-l. These six wells are currently cycled on and off, depending on whether their marginal gas oil ratio (GOR) is competitive with lower GOR production at the FS-I processing facility. Because the LPC is not currently gas- constrained, BPXA proposes to re-route this partially shut-in production through the L2 pad to the LPC processing facility and maintain full-time production from these wells. The Division of Oil and Gas (Division) approves BPXA's request to commingle production from the IPA with production from the LPA with the following conditions: (a) BPXA shall report production from the six IPA wells at the LPC as IPA production and include it on the IPA production reports; (b) BPXA shall report these volumes to the Division using selIing arrangement number 207002FOOO on the PRUD and PGAS accounting unit oil operator reports (01); (c) production from PBU IPA wells to the LPC shall be determined and allocated in accordance with the GPMA metering and allocation procedures; (d) NGLs removed from gas produced by these PBU IPA wells at the LPC shall be accounted for and reported as ¡PA NGLs; (e) BPXA shall provide the Division the appropriate NGL yield for IP A NGLs produced at the LPC within 10 days of the determination and provide the Division with the annual GPMA NGL allocation update; and (t) the updated Lisburne POD, due in June 2007, shall incorporate a description of operations associated with these six wells. "Develop, COllserve, alld ElIlzallce Natural Resources for Presellt alld Future Alaskalts. " . . Division of Oil & Gas 4113/07 ~age 2 of2 A person affected by this decision may appeal it, in accordance with 11 MC 02. Ally appeal must be received within 20 calendar days after the date of "issuance" of this decision, as defined in 11 AAC 02.040 (c) and (d), and may be mailed or delivered to Tom Irwin, Commissioner, DNR, 550 W. ih avenue, Suite 1400, Anchorage, Alaska 99501; faxed to 1 -907-269-8918, or sent by electronic mail to dnrapoeals@dnr.state.ak.us . This decision takes effect immediately. An eligible person must first appeal this decision in accordance with 11 AAC 02 before appealing this decision to Superior Court. A copy of 11 AAC 02 may be obtained fÌ"om any regional infonnation office of the Department of Natural Resources. If you have any questions regarding this decision, contact Cammy Taylor with the Division at 907- 269-8817. Sincerely, ,/ ~ Kevin R. Banks Acting Director cc: Sherri Gould, BPXA Sam French, BPXA Gary Benson, BPXA Ted Cahalane, BPXA Tim Verseput, BPXA Eric Reinbold, ConocoPhillips Gary Forsthoff, Chevron Hank Bensmiller, ExxonMobil John Norman, AOGCC Dave Roby, AOGCC Tom Maunder, AOGCC John Iversen, DOR Cammy Taylor, DNR Jim Stouffer, DNR Jeff Landry, DOL Schlumbepgøp Alaska Data & Consulting Services 2525 Gambe" Street, Suite 400 Anchorage, AK 99503·2838 ATTN: Beth Well MPL-09 S-400A 12-12A G-17A S-400A G-26B C-32C E-04A 07 -o7B L2-11 E-32A L-04 E-19B 2-16/M-16 1-39A1N-16 Job# 11767141 40015442 40015307 40013619 11855508 10942213 11628756 11801079 11216202 11209603 11767130 11603118 11767134 11846803 11628769 S1:;P",~NED OCT 3 1 2007 LOI:! Description MEM INJECTION PROFILE uTt' ¡D,n-I(jl OH MWDILWD EDIT )f'~ - (1-:+ '-I · tf){;.;')""x OH MWD/LWD EDIT ,('.., ~~ mrj--;¡" OH MWD/LWD EDIT ð 'CJ..o - A'?~"It I""\f_~ CH EDIT PDC GR (USIT) ,;:11'1 -:+ - () --:J.U 'l-l/::;-t..,~ MCNL Rt'J5 -n'-r~ -it /t'\fr>I/ MCNL ,:)t-,(ð - L~Ä #1"!\D,{() RST Io,<,r-/~ ¡t I~{J< MCNL .¢éCo -(')~I 1:1 1~(,,/)7-. MCNL tc,-sr _("',1 {",.. 1 Ç~()(..{ MCNL C'1('I - ¡~"X ~ 15'~Og.. MCNL ::::J()G::, - I~ì '11 ¡ J~ MCNL ':)--:¡... - Ò-;¡..~ .... 1S0 U ( RST Uï(1 )-4(7( - (2...q µ 1-<\ G()Ò MCNL .!}Q~ -/"'í<:--:t:S%: .....:"\....., PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ~JCT ,'~ lOG? c- ~....; " ,'< ;;::;>~(\..; '_. ;":;,-'3è~..·'-.~ ,." Date 09/16/07 09/14/07 06/18/07 06/18/07 09/18/07 05/23/05 02/18107 06/23/07 06/28/06 04/30106 06/19/07 12/30106 07/21/07 08/13/07 04115107 NO. 4449 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay BL 1 2 3 3 Color CD 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 r1ì ~ '1..+"Rt1. 'n -- 1 1 1 Alaska Data & Consulting Services 2525 Gambe" Street, Suite 4 0 Anchorage, AK 99503- 3 ¡ ATTN: Beth Received by: 10/19/07 . . . . STATE OF ALASKA . ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS ,,~:;:'r," E'·./V··· 'E'.'·· "".',.J 0 2 0 2006 '¿¡ ¡hi ¡~;¡ [j". (',.... n 1. Operations Perfonned: '-. I ., AbandonD Repair WellŒ PluQ PerforatìonsD Stimulate 0 I~~ge ."" Alter CasingD Pull TubingD Perforate New PoolO WaiverD Time ExtensionD Change Approved ProgramD Operation ShutdownD Perforate 0 Re-enter Suspended WellD 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development ŒJ ExploratoryD 19R.n96n 3. Address: P.O. Box 196612 6. API Number Anchorage, Ak 99519-6612 StratigraphicO ServiceD 50-029-22885-00·00 7. KB Elevation (ft): 9. Well Name and Number: 50.10 L2-11 8. Property Designation: 10. Field/Pool(s): ADL-028321 Prudhoe Bay Field J Lisburne Oil Pool 11. Present Well Condition Summary: Total Depth measured 11485 feet true vertical 8670.0 feet Plugs (measured) None Effective Depth measured 11367 feet Junk (measured) None true vertical 8667.0 feet Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" x 30" 33 - 113 33.0 - 113.0 SURFACE 3656 9·5J8" 47# L-80 32 . 3688 32.0 - 3686.0 6870 4760 PRODUCTION 8592 7" 26# L·80 31 . 8623 31.0 - 8207.0 7240 5410 LINER 3023 4-1J2" 12.6# L-80 8461 - 11485 8062.0 . 8670.0 8430 7500 Perforation depth: 'CANNEr orT 2 If 2"~R ~ " ~'" ,..J~"",,;c .;.),tJU,,,-, Measured depth: 9760-9930,9950-10070,10240-10546, 10566-10790, 11000-11260 True vertical depth: 8711-8707,8706-8705,8699·8700,8700-8689,8678-8674 TubinQ (size. Qrade. and measured depth): 4-1/2" 12.6# L-80 @ 31 . 8462 4-1J2" Tubing Patch @ 6298 - 6333 KB Straddle Patch Packers & SSSV (type & measured depth): 4-1/2" BKR KB Straddle PKR @ 6298 - 6333 KB Straddle Patch 7" Baker S-3 Packer @ 8407 4·1/2" Cameo BAL-O @ 2183 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 Representative Dailv Averaae Production or Iniection Data Oil-Bbl Gas-Mef Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: SI ... --. --. 489 Subsequent to operation: 1329 17,986 0 .-- 621 14. Attachments: 15. Well Class after proposed work: ExploratoryO DevelopmentOO ServiceD Copies of Logs and Surveys run _ 16. Well Status after proposed work: Daily Report of Well Operations_ ~ mOO GasD WAG 0 GINJD WINJD WDSPLD Prepared by DeWayne R. Schnorr (907) 564-5174 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUndry Number or N/A if C.O. Exempt: Contact DeWayne R. Schnorr NJA Printed Name DeWaxne R. Schnorr Title Petroleum Engineer Signature ~~ ~ J;.j/ Phone 564-5174 Date 10/19/06 Fonn 10-404 Revised 4/2004 () RIG I ~l A I RBDMS BFl 2 3 2006 . . L2-11 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 03/17/2005 TII/0=0/100/0 MIT IA to 3000 psi, FAILED (Restore tubing integrity) - Pressure IA to 3000 psi w/ 7.3 bbls crude, 1 st test lost 980 psi in 15 min TP increased 75 psi, 2nd test lost 840 psi in 15 min, TP increased 375 psi, 3rd test lost 640 psi in 15 min, TP increased 550 psi IA to tbg LLR = 1.7 gpm Final WHP's=400/200/0 04/02/2005 TI0=SSV/300/0+, temp=SI. OA FL at 50' (OA FL survey). 04/11/2005 ASRC on well unable to monitor Tubing or IA fluid levels. 05/15/2005 T/I/0=130/140/0+. Temp=SI. T & IA FL's. (For EL LDL.) TBG & IA FL's near surface. 07/02/2005 TIO = 425/340/0. SI. T & IA FL (E-Line LDL). T FL @ 66'. IA FL near surface. 07/08/2005 **Leak Detection Log - PBMS-GMS-CFS-PFCS - Logged static baseline PL data from 100- 8440 ft at 120 FPM down. Ref. Log - Primary Depth Control 02-Dec-1998. No clear/large anomolies observed on baseline pass. 07/09/2005 **Leak Detection Log - PBMS-GMS-CFS-PFCS - Logged dynamic pass from 100 - 8420 ft at 120 FPM down. Ref. Log - Primary Depth Control 02-Dec-1998. Diesel pumped down IA- tubing out to surface tanker (IAlT 2700/250 psi - LLR was approximately 2.5 gallmin). Leak observed at 2nd gas lift mandrel 6316 ft MD (large temperature & spinner anomaly). Extra passes and stop counts taken over leak interval. 07/09/2005 T/I/0=420/350/2. Temp=SI. LLR with Triplex. (LDL, 3000 psi max). IA FL @ Surface. 23.5" (523.3 gal) in diesel trlr to start test. Pumped 56 gal to pressure up lAP to 2700 psi. Pumped 259 gal @ 2700 psi in 135 minutes for an average leak rate of 1.91 gal per minute. Monitor for 1 hour during rig down. Final WHP's=150/350/2. 07/17/2005 ***WELL SHUT-IN UPON ARRIVAL*** (ANNCOMM) PULL DMY GLV FROM STA #2 @ 6297' SLM. SET DMY GL V W/ EXTENDED PKG. IN STA #2 @ 6301' SLM. PULL CATCHER SUB. ***TURN WELL OVER TO DSO** ***WELL LEFT SII*** 07/21/2005 TII/O=SSVNAC/O+. Temp=SI. IA FL (pre MIT-IA). IA FL @ 30'. 07/31/2005 TII/0=380/0/0 M/T fA to 3000 psi. FAIL (Restore TBG Integrity) Pumped 21.6 bbls crude to pressure up to 3000 psi., IA lost 1060 psi in 15 min, Fail, bumped up w. 1 bbl of crude. IA Lost 100 psi in 3 min., FAIL, Pumped 2 bbls crude over 30 min. for a CfT fA. Bled WHP's. Final WHP's= 400/010 08/21/2005 *** WELL SHUT IN ON ARRIVAL *** (Pre tbg patch) PULLED PRONG (21/8" BODY, 1 3/4" FN, 96" OAL) @ 8411' SLM PULLED 4.5" X-LOCK FROM 8414' SLM RAN 3.700" X 20' LONG DUMMY PATCH TO 6500' SLM. 08/22/2005 (Pre tbg patch) SET 4.5" X -LOCK W/2.313" X NIPPLE REDUCER @ 8414' SLM SET 2.313" XX PLUG IN NIPPLE REDUCER @ 8414' SLM BLED DOWN TBG FROM 510 PSI TO 60 PSI ***WELL LEFT SI, TURNED OVER TO DSO*** Page 1 ~ _ t. .. . . L2-11 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 09/10/2005 Raw materials and machining charge for KB one-run patch system. 10/08/2005 TII/0=340/40/0+. Temp=SJ. TBG FL. (for E-Line). TBG FL @ 924' (15 bbl). 12/29/2005 ***WELL SI ON ARRIVAL*** PULLED 2.313" XX PLUG FROM NIPPLE REDUCER @ 8427' SLM RAN 1 1/2" ROLLER STEM W/2" CENT. W/ SB TO 9356' SLM. 12/30/2005 RAN 3.70" X 20' PATCH DUMMY TO 2500' SLM PULLED OUT OFF HOLE DUE TO WEATHER CHANGE SHUT DOWN DUE TO HIGH WINDS. 12/31/2005 RAN 3.70" X 20' PATCH DUMMY TO 6500' SLM ***WELL LEFT SI, TURNED OVER TO DSO*** 01/08/2006 TII/0=430/150/5. Temp=SJ. WHP's. (for E-line, set patch). SSV was closed, opened for TP and closed again. 01/10/2006 SET 35' x 4-1/2" BAKER KB STRADDLE PATCH. ELEMENTS 6298'-6333', TOP OF PATCH 6296.4', WLEG 6338.05'. UPPER KB STRADDLE PACKER HAS 4" GS FISHING NECK WITH 30K SHEAR RELEASE. MIN ID OF PATCH = 2.37" THRU UPPER & LOWER KB PACKERS. 01/16/2006 T/IIO = 700/670/870.80 deg. TIFL PASSED (Post TBG Patch). Shut-in well at wing. IA FL @ 30', TBG FL near surface. TBGP increased to 1850 psi and lAP decreased to 550 psi in 30 min, perform a Self-TIFL. Monitor 1 hr. IA FL @ 48', OA FL @ Surface, Final WHPs = 1990/420/530. Put well back on line. 01/19/2006 ***WELL FLOWING ON ARRIVAL *** (set sssv) CLEARED UP PLUGGED BALANCE LINE, BOTH LINES PURGED OK BRUSHED SVLN, RECEIVED CALL TO GO TO WGI-08, HOT JOB RETURNED WELL TO DSO, OK TO POP THE WELL *** WELL FLOWING UPON DEPARTURE *** 01/25/2006 **** WELL FLOWING ON ARRIVAL *** SET 4 1/2 WRDP-2 @ 2161 (SLM) ( SER. # HJS-20 OP 2100 PSI CP 1100 PSI). 01/26/2006 RIG DOWN. ***WELL LEFT S/I*** TURNED OVER TO DSO TO POP 01/28/2006 TII/0=1260/900/320 Temp=HOT TIFL PASSED (post tubing patch) Well was flowing naturally upon arrival. Shut in wing to do a selfTIFL. Initial TBG FI @ 1272'. IA FL @ 48'. OA FL @ surface. Monitor pressures and fluid levels for 1 hour for self TIFL. TBGP increased 860 psi to 2120 psi, the lAP decreased 270 psi to 630 psi and the OAP decreased 280 psi to 40 psi. IA FL inflowed 18' to 30', Bled IA pressure from 630 psi to 150 psi to bleed trailer in 5 minutes post TIFL (all gas, prep for MIT). Returned well to DSO to POP. Final WHP's=2120/150/40 01/29/2006 TII/0=2200/600/300. Temp=HOT. WHP's post-IA bleed (post TBG patch). **Note** took sample of glaciation. TBGP decreased 80 psi, lAP increased 450 psi & OAP incresed 260 psi since 1/28/06 Page 2 . . L2-11 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 04/16/2006 *** WELL FLOWING UPON ARRIVAL*** {pre cnl} TAGGED WRDP W/3.833" GAUGE RING. PULLED 41/2" WRDP-2 (S/N- HJS-20) FROM 2159' SLM. DRIFTED W/2' STEM, 2.25" CENT, SAMPLE BAILER TO 9346' SLM (75 DEGREES) SAMPLE BAILER CAME BACK EMPTY. ** TURNED WELL OVER TO DSO TO POp** 04/30/2006 Drift! MCNL / CTU#9. / MIRU. RIH with 2.25" JSN. Tag TD at 11361' ctmd. Flag pipe at 11,311' ctmd. POOH. RIH with MCNL logging tools, tag at 8462', could not work past, POOH with MCNL and RU to run MCNL with 2.20" carrier. 05/01/2006 RIH with SLB MCNL inside a 2.20" 00 carrier (22' OAL) to coil flag depth of 11311 '. No problems getting past previous tag at 8462'. Perform 2 logging passes from flag depth of 11311' up to 8750' while pumping 1 % KCL down backside at 2 bpm. POOH with SLB MCNL tools, displacing well bore with diesel to perfs.Tag at surface, break down logging tools, good data collected and fog corrected. RD CTU #9. *** JOB COMPLETE *** 05/02/2006 ***WELL SII ON ARR*** DRIFT TO AND BRUSH SSSVN @ 2157' SLM. RAN 4 1/2 Z~6 W/ 41/2 WRDP-2 (SER. HPS-385) SET @ 2155 SLM. DID NOT SET RIGHT, RAN 41/2 PRS W/119" PRONG,SAT DOWN @ 2155 SLM.PULLED VALVE. RAN 41/2 Z-6 W/119" PRONG, W/41/2 WRDP-2 (SER. HKS-44) SAT DOWN @ 2155 SLM.SET. PERFORMED GOOD CLOSURE TEST ***WELL LEFT SII, NOTIFIED DSO OF ST A TUS*** OS/26/2006 *** WELL SII ON ARRIVAL *** (pre ctu N2lift) DRIFT W/3.80 G.R. TO SSSVN @ 2155' SLM. OS/27/2006 MAKE SEVERAL TRIPS W/3.5" SLIM LINE W/120" PRONG TO 2155' SLM RECOVER WRDP-2 ( SER# HKS-44 ) DRIFT DOWN TO DEV W/2.25" CENT, SAMPLE BAILER STOP @ 9323' SLM ***WELL SII ON DEPARTURE**** ( NOTIFIED DSO ) OS/28/2006 TII/O= 340/120Nac. Temp= SI. Tbg FL (Pre N2Iift). Tbg FL @ 300' (4.6 bbls). 05/31/2006 CTU #5, N2 Lift; MIRU CTU #5. RU N2 unit. RIH with 2.0 " JSN assy. Begin lifting with N2 at 500 scflm. RIH to max. depth of 8580' ctmd. Increase rate to 750 scflm. PUH to above patch at 6200' ctmd. Shut down and monitor. FWHP stable at 1100 psig. FWHT stable at 73 deg F. POOH. RD CTU #5. *** Job Complete *** 06/04/2006 ***WELL FLOWING ON ARR*** RU SWCP 4515. 06/05/2006 DRIFTED W/ 3.855" GR TO 2154' SLM, BRUSHED NIPPLE W/ 4.5" BLB, 3.75" GR, SET 4.5" Z-6, 4.5" WRDP-2 (SER# HKS-44) TWO SETS PACKING, VALVE WILL NOT PRESSURE UP MAKE UP TOOLS TO PULL VALVE. VALVE NOT EQUALIZED. POOH. RIG DOWN UNIT DIVERTED TO WELL KILL JOB ON D-11 ***WELL LEFT SHUT IN*** 06/06/2006 *** WELL SHUT IN UPON ARRIVAL *** REGAIN CONTROL LINE INTEGRITY, PERFORM SUCCESSFUL CLOSURE TEST ***WELL LEFT S/I, NOTIFIED DSO OF STATUS*** 10/08/2006 BOPD: 632 BWPD: 9 MCFPD: 17,688 AL Rate: Page 3 . . L2-11 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS FLUIDS PUMPED BBLS 4 PT Surface Equipment 4 50/50 Methanol Water 148.3 60/40 Methanol Water 130 Diesel 34 Crude 772 1 % KCL Water 2800 Gallons N2 1092.3 TOTAL Page 4 TREE = WRLHEAD = ACTUA TOR = KB. 8.EV = BF. REV = KOP= Max Angle = Datum MD = Datum lVD = ? FMC GEN 5 BAKER C 50.1' 4022' 97 @ 9684' NA 8800' SS 19-5/8" CSG, 47#, L-80, ID = 8,681" I Minimum 10 = 2.313" @ 8440' 4-1/2" XX PLUG REDUCER 14<1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" H TOPOF 4-1/2" LNR H 8461' 8461' 7" CSG, 26#, L-80, ID = 6.276" I 8623' PERFORA TION SUMMARY REF LOG: SPERRY -SUN DGR ON 06/24/97 ANGLEA T TOP PERF: 94 @ 9760' Note: Refer to A'oduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 4 9760 - 9930 0 06/27/98 2-7/8" 4 9950 - 10070 0 06/27/98 2-7/8" 4 10240 - 10546 0 06/27/98 2-7/8" 4 10566 - 10790 0 06127/98 2-7/8" 4 11000-11260 0 06/27/98 10ÆN HOLE I 11041' L2-11 I SAFETY NOTES: PRUDHOE B Y . 2183' -14-112" CAMCO BAL-O, ID = 3.813" I ST MD lVD 1 3518 3516 2 6318 6107 3 8339 7954 GAS LIFT MANDRELS DEV TYÆ VLV LATCH 20 KBG2LS DMY !NT 39 KBG2LS DMY INT 32 KBG2LS DMY INT PORT DATE o 04/07104 o 12/28/04 o 04/07/04 6298' ·6333' 4-112" BKR KB STRADDLE PATCH, 10 = 2.37" 8407' -f 7" X 4-1/2" BAKER S-3 PKR I -f4-1/2"HESXNIP,ID=3.813" I -f4-1/2" XX PLUG REDUCER, 10= 2.313" -f4-1/2" WLEG H ELMD NOT LOGGED I ~ 8790' 9262' 9377' -f4-1/2" HES X NIP, ID = 3.813" I -f4-1/2" HES X NIP, ID= 3.813" -f TOP OF CEMENT I SIDETRACK WINDOW 9453' - 9475' I 11367' HPBTD I 14-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.953" H I TD I DATE 06/28/98 08/11/01 04/07/04 12/28/04 08/22/05 09/23/05 REV BY COMMENTS ORIGINAL COMPLETION RN/TP CORRECTIONS JLJ/KK GL V C/O RWLlTLP GL V C/O lWSITLH XX PLUG REDUCER SET WTSITLH XX PLUG SET (08/22/05) DATE REV BY COMMENTS 12/13/05 ASITLH CORRECTION (PRUDHOE WELL) 01/10/06 DFRlPJC PATCH 04/17/06 KSB/PAG XX PLUG PUlLED (12/29/05) 05/31/06 CO/DTM TREE CORRECTION (6/13/04) LISBURNE UNIT WELL: L2-11 ÆRMIT No: "1980960 API No: 50-029-22885-00 SEC 18. T11N, R15E, 1908.48' FEL & 2126.26' FNL BP Exploration (Alaska) _ STATE OF ALASKA . AlA~ Oil AND GAS CONSERVATION COM SION REPORT OF SUNDRY WELL OPERATION o o o Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure SHUT-IN 21304 0 15. Well Class after proposed work: Exploratory Development ;?¡ 16. Well Status after proposed work: Oil ;?¡ Gas WAG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. .. 1. Operations Abandon 0 Repair Well [] Performed: Alter Casing 0 Pull Tubing 0 Change Approved Program 0 Opera!. Shutdown 0 2. Operator BP Exploration (Alaska), Inc. Name: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 3. Address: 50.1 KB 8. Property Designation: ADL-028321 11. Present Well Condition Summary: Total Depth measured 11485 true vertical 8670.17 Effective Depth measured 11367 true vertical 8666.61 Casing Conductor Surface Production Liner Length 80 3656 8592 3023 Size 20" x 30" 9-5/8" 47# L-80 7" 26# L-80 4-1/2" 12.6# L-80 Perforation depth: Measured depth: 9760 - 9930 True Vertical depth: 8710.95 - 8706.67 Tubing: (size, grade, and measured depth) Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Oil-Bbl Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations 1346 x Contact Sharmaine Vestal Printed Name Sharmaine Vestal k Signatu~~ Form 10-404 Revised 04/2004 RECEIVED FEB 1 6 ¿OUS Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development ;?¡ Stratigraphic Stimulate 0 WaiverD Time 8Etension Re-enter Suspended Well 0 5. Permit to Drill Number: Exploratory Service 198-0960 6. API Number: 50-029-22885-00-00 9. Well Name and Number: L2-11 10. Field/Pool(s): Prudhoe Bay Field/ Prudhoe Bay Oil Pool feet feet Plugs (measured) Junk (measured) 8440 PXN None feet feet ,¡(..I'> "\Mer '. F F ~'(. ~I/'tu~;r'~[";;:·/ j !,_.~ __ 't:$, TVD 33 - 113 32 - 3685.66 31 - 8207.05 8062.42 - 8670.13 4760 5410 7500 MD 33 - 113 32 - 3688 31 - 8623 8461 - 11484 Burst Collapse 6870 7240 8430 9950 - 10070 8705.59 - 8704.66 10240 - 10546 10566 - 10790 11000 - 11260 8677.98 - 8674.17 8699.42 - 8699.99 8699.96 - 8688.9 4-1/2" 12.6# 3-1/2 KB Straddle Patch L-80 31 - 8462 6298 - 6333 4-1/2" Baker S-3 Perm Packer KB Straddle Pkr KB Straddle Pkr 8407 6298 6333 RBDMS 8Ft FfB 1 1 2006 Tubing pressure 870 700 Service WDSPL Title Data Mgmt Engr Date 2/16/2006 Submit Original Only .. e e ,. L2-11 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDA TE. SUMß(fSY.~!s.1 1/8/2006 T/I/O=430/150/5. Temp=SI. WHP's. (for E-line, set patch). SSV was closed, opened for TP and closed again. 1/10/2006 SET 35' x 4-1/2" BAKER KB STRADDLE PATCH. ELEMENTS 6298'-6333', TOP OF PATCH 6296.4', WLEG 6338.05'. UPPER KB STRADDLE PACKER HAS 4" GS FISHING NECK WITH 30K SHEAR RELEASE. MIN ID OF PATCH = 2.37" THRU UPPER & LOWER KB PACKERS. 1/16/2006 T/I/O = 700/670/870. 80 deg. TIFL PASSED (Post TBG Patch). Shut-in well at wing. IA FL @ 30', TBG FL near surface. TBGP increased to 1850 psi and lAP decreased to 550 psi in 30 min, perform a Self-TIFL. Monitor 1 hr. IA FL @ 48', OA FL @ Surface, Final WHPs = 1990/420/530. Put well back on line. 1/19/2006 ***WELL FLOWING ON ARRIVAL*** (set sssv) CLEARED UP PLUGGED BALANCE LINE, BOTH LINES PURGED OK BRUSHED SVLN, RECEIVED CALL TO GO TO WGI-08, HOT JOB RETURNED WELL TO DSO, OK TO POP THE WELL *** WELL FLOWING UPON DEPARTURE *** 1/25/2006 **** WELL FLOWING ON ARRIVAL*** SET 41/2 WRDP-2 @ 2161 (SLM) (BAL. OPERATED SER. # HJS-20 OP 2100 PSI CP 1100 PSI). *** CONTINUE TO 01/26/06 **** 1/26/2006 *** CONTINUE FROM 01/25/06 *** RIG DOWN. ***WELL LEFT S/I*** TURNED OVER TO DSO TO POP 1/28/2006 T/I/O=1260/900/320 Temp=HOT TIFL PASSED (post tubing patch) Well was flowing naturally upon arrival. Shut in wing to do a self TIFL. Initial TBG FI @ 1272'. IA FL @ 48'. OA FL @ surface. Monitor pressures and fluid levels for 1 hour for self TIFL. TBGP increased 860 psi to 2120 psi, the lAP decreased 270 psi to 630 psi and the OAP decreased 280 psi to 40 psi. IA FL inflowed 18' to 30'. Bled IA pressure from 630 psi to 150 psi to bleed trailer in 5 minutes post TIFL (all gas, prep for MIT). Returned well to DSO to POP. Final WHP's=2120/150/40 1/29/2006 T/I/O=2200/600/300. Temp=HOT. WHP's post-IA bleed (post TBG patch). **Note** took sample of glaciation. TBGP decreased 80 psi, lAP increased 450 psi & OAP incresed 260 psi since 1/28/06 FLUIDS PUMPED BBLS 1 I ::::L 1 Problem Well Notice: L2-11 (PTD 1980960) ) ~ h')e- Subject: Problem Well Notice: L2-11 (PTD 1980960) From: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com> Date: Thu, 16 Dec 2004 15 :47 :44 -0900 . . TC):: . "RQssberg, R Steven" <RossbeRS@BP~com>, "GPB, Wells OptEng" . .. <GPBWellsOptEng@BP.com>, "GPB; Ops.Mgr"<GPBOpsMgr@BP.èom>,.ItNSU,.ADWWL & . Completion Supervisor" <NSUADWWL&CoinpletionSupervisor@BP..coIil>' ."AOGCÇ .~ Jim 'Regg : (E--.mailY~<jim_¡'egg@admin.state.ak.us>, "AOGCC ~ Winton Aubert.(E~ll1ail)". ..~.. . . . <winton:-aubert@admin.state.ak:.us>,. "NSU, ADW WellOperatiòns Supervisor" ~: . <NSUADWW ellOperationsSupervisor@BP.com>, f'GPB;FS l/SIP/STp. Area Mgr" : <qPBFSITL@BP.com>,."GPB, LPC DS ops'Lead" <GPBLPCDSQpsLead@BP.com>, "GPB, FSl DSlS Operator" <GPBFSIDS180perator@:BP.com>, "GPB, FSI DS QpsLead".. .. . . <GPBFSIDSOpsLead@BP.com>, "Schriloyer, AI" <SchmoyAL@BP.com>,-"Heusser,Julie M (ORBIS)" <heusjm@BP.com> '.:.. '.....", .'.. '.' .". .. . CC: "Reeves, Donald F" <ReevesDf@BP.col11>, tiNSU, ADW WellIntegrity Engineer" <NSUADWWellIntegrityEngineer@BP.com>. . . ". . . .. .'. . . . ) AlII Well L2-11 has IA pressure above 2000 psi and has been classified as a Problem Well. It failed a TIFL and the wellhead pressures on 12/15/04 are TIO = 2380/2380/vac. Note this well is processed at the Flow Station #1 facility. The plan forward is to: 1) SL: Replace the DGLV at GLM #2 2) DHD: Re-TIFL Attached is a wellbore schematic. Please call if you have any questions. Joe Anders, P.E. Well Integrity Coordinator I BP Explorationl (Alaska) Inc. Work: 1-907-659-5102 Mobile: 943-1154 Pager: 659-51001 xl154 Email: ~.§.:Q?:.Q.~!.!.~..~..~..~.!!:.~..~.9E..~..~.y..~.g.9...~.P.:.~.~..~~.Ì.?,P"..:....S?g,~ «L2-11.pdf» Content-Description: L2-11.pdf Content-Type: application/octet-stream Content-Encoding: base64 SCANNE~,) J,t\N 11 2005 1 of 1 12/20/2004 8:49 AM ') TREE = _? WELLHEAD = FMC GEN 5 "Þ;'CTÛÄ.tÓR';"""" ,uBA"kER''; ï<Ë3.""ELEV = --"~õ~'f BF:ELEV ;"'u",,, .u......."""'U_~. ~_.... KOP = 4022' ~~."."... ~"_.~.- -- ~ -,_._..~--_..'''_.,.__.._-_..._. Max Ang Ie = 97 @ 9684' DatumMD= 11725' 'öatü m'ïVö;"""'''''saõöö''S"s I 9-5/8" CSG, 47#, L-80,ID = 8.681" I~ 3688' Minimum ID = 3.813" @ 2183' CAMCO BAL-O SSSV NIPPLE 14-1/2" TBG, 12,6#, L-80, 0,0152 bpf, ID = 3,958" 1-1 8461' TOPOF 4-1/2" LNR I~ 8461' 1 7" CSG, 26#, L-80, ID = 6.276" 1-1 8623' I~ ÆRFORA llON SUMMA.RY REF LOG: SPERRY-SUN DGR ON 06(24/97 ANGLEA TTOPPERF: 94 @ 9760' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-718" 4 9760-9930 0 06/27/98 2-718" 4 9950-10070 0 06/27/98 2-718" 4 10240-10546 0 06/27/98 2-718" 4 10566-10790 0 06/27/98 2-718" 4 11000-11260 0 06/27/98 IOPEN HOLE H 11041' 1 ) L2-11 I SAFETY NOTES e 2183' 1--14-1/2" CAMCO BAL-O, ID =3.813" 1 ~ ~ GAS LIFT MANDRELS DE.\! TYPE VLV LATCH 20 KBG2LS DMY INT 39 KBG2LS DMY INT 32 KBG2LS DMY INT PORT DATE 0 04/07/04 0 04/07/04 0 04/07/04 ST MD lVD 1 3518 3516 2 6318 6107 3 8339 7954 L :g: ~ 8407' 1--17" X 4-1f2" BAKERS-3 PKR 1 I 8440' 1--14-1/2" HES X NIP, ID= 3.813" 1 WI 'II 8462' 1-14-1(2" WLEG 1 HELMD NOT LOGGED 1 ~ ~ ~ 8790' 1-14-1/Z' HES X NIP, ID = 3,813" 1 9262' 1-I4-1/Z'HESXNP,ID=3.813" 1 9377' I-ITOPOFC8v1ENT 1 SIDEfRACK WINDOW 9453' - 9475' 11367 I-1PBlD I 14-1/2" LNR, 12.6#, L-80, 0.0152 bpf, ID= 3.953" l-i 1 TD H DATE REV BY COMWENlS 06/28/98 ORIGINAL COMPLETION 08/11/01 RNlTP CORRECTIONS 04/07/04 JU'KK GL V C/O DATE REV BY COMVIENTS LISBURNE UNIT WELL: L2-11 ÆRMT No: 98-096 API r-b: 50-029-22885-00 Sec. 18, T11 N, R15E, 1908.48 FEL 2126,26 FNL BP Exploration (Alaska) 'Well Compliance R¢~°rt File on Left side of folder 198-096-0 PRUDHOE BAY UN PBU L2-11 50- 029-22885-00 ARCO MD 11485~ TVDqJ8670_ Completion Date: /~2~8 Completed Status: 1-OIL Current: Name Interval Sent Received T/C/I) . 8717 OH SPERRY MPT/GR/EWR4 9/16/98 9/16/98 D 8718 D 8719 D 8891 L DEPTH-TEM/PRES L DGR/EWR4-MD L DGR/EWR4-MD ~5(-7 SPERRY MPT/GR/EWR4 PB 1 OH ~0 SPERRY MPT/GR/EWR4 PB2 OH t..l./''- SCHLUM GR/CCL/PDC CH .~"F~AL 5000-9322 ,q,{"I. lq'~ CH 5 ,. ~o~.w~4_=~ .,~;~ 3,00.,14,,~/,,lw. 6l~q, L DG~EWR4-TVD ~ 3698-8700 ~ OH ~ ~o~o,,~w.~_.~ ~= 3~9.694 """.l.~l**~ ~3oh~ o. ~ ~,,~w~4_.~ 369.6.9 L PEX-~T ~AL 9618-9480 ~[~[~ OH L PEX-CN ~NAL 9618-9480 ~1~1~ OH ./ L PEX-NDT/GR ~ 9618-9480 ~/~lqa o~ L PEX-SSTVD ~AL 9618-9480 ~l{[~ OH cc~STAT PRESSURE 1 ~ ........ W e~ CH 2/5 R SRVY RPT ~RRY 0-11041. PB1 OH R SRVY RPT ~ERRY 9429.58-11026. PB2 OH R SRVY RPT ~RRY 10520.04-11485. OH 9/9/98 9/9/98 9/16/98 9/16/98 3/4/99 3/11/99 12/18/98 1/5/99 9/9/98 9/9/98 9/16/98 9/16/98 9/23/98 9/23/98 9/23/98 9/23/98 9/9/98 9/9/98 9/16/98 9/16/98 8/11/98 8/20/98 8/11/98 8/20/98 8/11/98 8/20/98 8/11/98 8/20/98 7/17/95 7/24/95 7/13/98 7/22/98 7/13/98 7/22/98 7/13/98 7/22/98 T 8625 4/ ~S~2HLUM PEX-AiT/PDC OH 8/11/98 8/20/98 Was the well cored? yes ~")..~_~__ Analysis Description Receivec[-'~J~~ample Set~ Comments: Tuesday, May 30, 2000 Page 1 of 1 3/4/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 AI'I'N: Sherrie NO. 12395 Compan~ Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy LIS Well Job # Log Description Date BL Sepia Disk Tape D.S. 7-08A ~ 99093 MCNL "~ ~ <~ °t O 990204 I I 1 D.S. 14-04A 99068 MCNL ~-.-~'~ c~ <~ 990102 1 I ] D.S. 15-11A j;~~ 99092 MCNL -'l:r,:- ~O"3. O 990206 I I 1 L2-11 99091 GR/CCL (PDC)J~ ~ i 981202 1 D.S. 13-02B MEMORY GR/CCL/JEWELRY 990227 1 1 D.S. 13-02B MEMORY GR/CCL/DDL 990228 1 I SlG DATE: .... :. :') 'i 't "~ :'~., ~':). Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 562-652¥.C~ you. 1/4/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATTN: Sherrie NO. 12196 Compan~ Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole] LIS Well Job # Log Description Date BL Sepia Tape L2-07 98640 PEX-AIT/BHC ~.~.~ 981128 1 L2-07 98640 PEX-AIT 981128 1 1 L2-07 98640 PEX-MCFL 981128 1 1 r.2-o7 98640 PEX-CNL 981128 1 1 L2-07 98640 PEX-3 DET.DEN. CNL 981128 1 1 L2-07 98640 BHC 981128 1 1 L2-07 98640 SSTVD 981128 I 1 'L2-O~ 98640 e~ VOL~ ~O~ ~S~2S 1 1 D.S. 6"!0A 98626 DLL/DAS/CNT/SDN 981030 1 *REDO -TO CORRECT GR ~ ~~ I .L2-11 [ 98400 PEX-AIT 980604 API~ IS INCORRECT ON TAPE & PRINTS SHIPPED OUT 8/11/98.PLEASE MAKE CORRECTION TO REFLECT CORRECT API~ AS 50-029-22885-00. SIG DATE: !' "'~ U,~ ,.,../ ^nch0rage Ploaso sign and fotura on~t:op¥ o! INs trcmsmittal to Shorrio at tho abovo addross. Thank ¥ou.' 12/18/98 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 AI'I'N: Sherrie NO. 12178 Companl Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy LIS Well Job # Log Description Date BL Sepia Disk Tape GNI #2 PRESS & TEMP SURVEY 981102 1 1 L2-11 DEPTH DETERMINATION LOG 981202 1 1 D.S. 6-10A CBL/SLIM-CMT 981114 1 1 D.S. 7-8 PRODUCTION PROFILE 981127 1 1 D.S. 7-34 GR/CCL 981122 1 1 D.S. 7-34 GR/CCL 981124 1 1 D.S. 12-11 PRODUCTION PROFILE 981102 1 1 D.S. 12-27 ~ ~ c INJECTION PROFILE 981117 1 1 D.S. 12-30 PRODUCTION PROFILE/GLS 981121 1 1 D.S. 12-30 DIG.ENTRY&FLUID IMAGER 981121 1 1 D.S. 16-24 INJECTION PROFILE 981105 1 1 D.S. 17-01 PROD.PROFILE W/DEFT 981202 1 1 D.S. 17-06 u,.~ (~ INJECTION PROFILE 981103 1 1 i ii SIG DATE: CO ~,~ ~.~ i..~ , Please sign and return on py of this transmittal to Sherrie at the above address or fax to (9u7) 562-6521~:,' nfl I I_1_1 ~ G SEFI~JICE S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 September 23, 1998 RE: MWD Formation Evaluation Logs D.S. L2-11, AK-MM-80238 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention off Ali Turker, Sperry-Sun Drilling Services, 5631 Sitverado Way, #G, Anchorage, AK 99518 D.S. L2-11: 2"x 5" MD ResistMty & Gamma Ray Logs: 50-029-22885-00 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-029-22885-00 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518. (907) 273-3500 · Fax (907) 273-3535 A Dresser Industries, Inc. Company State of A/aska A/aska 0//and Gas Conservation Attn.: Lo5 Taylor Comm. 3001 Porcupine Dr. / September 16, 1998 Anchorage, A/asks 99501 RE.. MWDFormationEvaluationLogs.D.S. L2.11, ' 'wmq'80238 The tec/m/cal data listed below is being submitted herewith. P/ease s~gned Copy oftl~s transmittal letter to the attent/on of.' acknowledge receipt by returning a Ali Turker, Sperry-Sun Dr////ng Services., 5631 Silverado Way, #G, Anchorage, AK 99518 LDWG formatted Disc with v rification APIS: 50-029.22885.00e listing. '~a,~. ~ Gi & G~ Cons. ~nc, Jlo~ge 503-1 Silverado Way, SUite G · Anchorage, Alaska 99518. (@07) 273-3500. Fax (007) 273-3535 A Dresser Industries, Inc. Company WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 September 16, 1998 RE: MWD Formation Evaluation Logs D.S. L2-11 PB2, AK-MM-80238 The technical data listed below is being submitted herewith. Please address any problems or concerns _ to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 D.S. L2-11 PB2: 2"x 5"MD Resistivity & Cranuna Ray Logs: 50-029-22885-71 2" x 5" TVD Resistivity & Garmna Ray Logs: 50-029-22885-71 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Dresser Industries, Inc. Company WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - D.S. L2-11 PB2, September 16, 1998 AK-MM-80238 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a _ signed copy of this transmittal letter to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-22885-71. ,'~!a~,a C4.i & Ga Cons. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs D.S. L2-11 PB 1, September 9, 1998 AK-MM-80238 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of. Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 I).S. L2-11 PB1: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-22885-70 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-029-22885-70 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, inc. Company WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Loft Tavlor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - D.S. L2-11 PB 1, September 9, 1998 AK-MM-80238 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a _ signed copy of this transmittal letter to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-22885-70. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11470 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 8/25/98 Field: Prudhoe Bay (Open Hole) Floppy Well Job # Log Description Date BL RF Sepia Disk L2-11 I 98400 IPEX&AIT *REDO- TO CORRECT APl # (50-029-22885-00)- PLEASE CORRECT YOUR PRINTS TO REFLECT T tE CHANGE. / · ' / · /5) ~ ~,,.~.,~ / ~. ',, SlGNED:~k . DATE: Please sign and return one to Sherrie at the above address. Thank you. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO, 11419 Company: Alaska Oil & Gas Cons Corem Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 8/11/98 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL RF Sepia Tape L2-11.~:~-,~Z~'- 98400 IPEX&AIT 980604 1 L2-11 98400 'PEX-Aff 980604 I 1 L2-11 98400 PE~CNL 980604 I 1 L2-11 98400 PEX-NEUTRON/DENSITY 980604 I 1 L2-11 98400 PEX-SSTVD 980604 I 1 ,' SIGNED: ~___~ DATE: Please sign and return one copy of this transmittal to Sherrle at the above address. Thank you. RECEIVED AUG 2_ 0 ]998 Alaska Oil & Gas Cons. Commissiorl Anchorage · . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND 1. Status of Well Classification of~.el~.,i~;~h~a$ Cons. [~ Oil [] Gas I~ Suspended [] Abandoned [] Service i2. Name'of Operator 7. Permit Number ARCO Alaska Inc. 98-96 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22885 4. Location ofwellatsurface ~ '.',~,,'.:':_:~::u~, i 9. Unit orLeaseName 1432' NSL' 1119' EWL' SEC' 18' T11N' R15E' UM i~/~Z~ii ~'~.~ ~ ~~!'.~~i~"~"'"']i Prudhoe Bay Unit At top of productive interval , ~ .~ 10. Well Number 3462' NSL, 4034' WEL, SEC. 18, T11 N, R15E, UM ,~ ........ r Ar',;J ~ L2-11 At total depth ;,. ......... ~ · 11. Field and Pool 3151' NSL, 1917' WEL, SEC. 18, T11N, R15E, UM'':--~: ~'''' ................... Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc~).~,.: lC. Lease Designation and Serial No. Pool KBE = 50.10' "":'I ADL 028321 12. Date Spudded5/19/98 113' Date I'D' Re'tahoe I 14' Date C°mp" Susp~°r Aband'115' water depth' if' °ffsh°re 116' NO' °f c°mpleti°ns6/23/9'8 6/28/98 / - N/A MSL, One 17. Total Depth (MD+TVD)I18. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV ~set 12.1. Thickness of Permafrost 11485 8670 FTI 11399 8667 FTI [~Yes E~No (Nipple) 2183' MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, DIR, GR, RES, RES/AlT, DT/BHC, CNL, LDL, GR, Caliper, SP, MRES 0_~ i {'~.i ~\~AL 23. CASING, LINER AND CEMENTING RECORD CASING SE'FrING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO-FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20" Insulated Cond. Surface 110' 30" 260 sx Arctic Set (Approx.) 9-5/8" 47¢ L-80 38' 3688' 12-1/4" 155 sx PF 'E', 295 sx 'G', 1304 sx PF 'E' 7" 26# L-80 33' 8623' 8-1/2" 385 sx Class 'G' 4-1/2" 12.6# L-80 8468' 11484' 6" 380 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" Gun Diameter, 4 spf 4-1/2", 12.6#, 1-80 8462' 8407' MD TVD MD TVD 9760' - 9930' 8711' - 8707' 9950' - 10070' 8706' - 87O5' 26. AcID,FRACTURE, CEMENT SQUEEZE, ETC. 10240' - 10790' 8700' - 8689' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11000' - 11260' 8678' - 8674' Freeze Protect with 85 Bbls of Diesel 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) July 4, 1998 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-EEL GAS-MCF WATER-EEL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE ~28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. , Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 8632' 8215' , Shublik 8682' 8260' Sadlerochit / Zone 4 8749' 8320' Zone 3 8842' 8399' Zone 2 8930' 8470' Zone 1B 9216' 8642' Zone lA 9333' 8680' Base of Sadlerochit 9548' 8713' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~'~--~-~ -"'- ~ ~ '? t/3 ~ { q ~, Dan Stone ' Title Engineering Supervisor Date L2-11 98-96 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No, / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 2?: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Performance Enquiry Report Operator ARCO Date 16:19, 31 Jul 98 Formation Integrity Test, L2-11 Page The analysis is from - 20:30, 24 May 98 - to - 20:30, 24 May 98 Programs in Result Table: L2-11 Well Type Time From Time To Duration Description E.M.W.(equivalent mud weight) L2-11 Event 20:30, 24 May 98 20:30, 24 May 98 0 hr 0 min Obtained leak off 13.3 Depth MDR 4305.0 Hole Size MDR 8-1/2 Progress Report Facility Lis DS 02 Well L2-11 Rig (null) Page 1 Date 21 July 98 Date/Time 19 May 98 20 May 98 21 May 98 22 May 98 23 May 98 02:00-06:00 06:00-11:00 11:00-11:15 11:15-14:00 14:00-14:30 14:30-14:45 14:45-15:30 15:30-16:00 16:00-17:00 17:00-18:30 18:30-19:30 19:30-00:00 00:00-00:15 00:15-06:00 06:00-12:00 12:00-12:15 12:15-00:00 00:00-00:15 00:15-00:45 00:45-02:00 02:00-02:45 02:45-03:45 03:45-04:30 04:30-05:00 05:00-06:00 06:00-08:30 08:30-12:00 12:00-12:30 12:30-00:30 00:30-02:00 02:00-04:00 04:00-05:30 05:30-06:00 06:00-08:00 08:00-10:00 10:00-12:00 12:00-12:30 12:30-21:00 21:00-23:30 23:30-00:00 00:00-01:45 01:45-02:00 02:00-04:00 04:00-04:15 04:15-05:45 05:45-06:00 06:00-08:00 08:00-09:30 09:30-12:00 12:00-12:30 12:30-16:00 16:00-16:30 16:30-20:00 20:00-22:00 Duration 4hr 5 hr 1/4 hr 2-3/4 hr 1/2 hr 1/4 hr 3/4 hr 1/2 hr lhr 1-1/2 hr lhr 4-1/2 hr 1/4 hr 5-3/4 hr 6hr 1/4 hr 11-3/4 hr 1/4 hr 1/2 hr 1-1/4 hr 3/4 hr lhr 3/4 hr 1/2 hr lhr 2-1/2 hr 3-1/2 hr 1/2 hr 12hr 1-1/2 hr 2 hr 1-1/2 hr 1/2 hr 2hr 2hr 2hr 1/2 hr 8-1/2 hr 2-1/2 hr 1/2 hr 1-3/4 hr 1/4 hr 2hr 1/4 hr 1-1/2 hr 1/4 hr 2 hr 1-1/2 hr 2-1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 3-1/2 hr 2 hr Activity Rig moved 30.00 % Rig moved 100.00 % (cont...) Held safety meeting Installed Divertor Tested Divertor Held safety meeting Made up BHA no. 1 Held safety meeting Made up BHA no. 1 Drilled to 111.0 ft Made up BHA no. 1 Drilled to 411.0 ft Held safety meeting Drilled to 826.0 ft Drilled to 1124.0 ft (cont...) Held safety meeting Drilled to 2013.0 ft Held safety meeting Drilled to 2108.0 ft Circulated at 2108.0 ft Pulled out of hole to 188.0 ft Pulled BHA Downloaded MWD tool Pulled BHA Made up BHA no. 1 R.I.H. to 2108.0 ft Drilled to 2393.0 ft Held safety meeting Drilled to 3700.0 ft Circulated at 3700.0 ft Pulled out of hole to 1080.0 ft R.I.H. to 3700.0 ft Circulated at 3700.0 ft Circulated at 3700.0 ft (cont...) Pulled out of hole to 188.0 ft Pulled BHA Held safety meeting Ran Casing on landing string to 3687.7 ft Circulated at 3687.7 ft Held safety meeting Mixed and pumped slurry - 120.000 bbl Functioned DV collar Circulated at 2188.3 ft Held safety meeting Mixed and pumped slurry - 504.000 bbl Functioned DV collar Rigged down Cement head Removed Divertor Installed Casing head Held safety meeting Rigged up All rams Rigged up BOP test plug assembly Tested All rams Rigged up Flowline Progress Report Facility Lis DS 02 Well L2-11 Rig (null) Page 2 Date 21 July 98 Date/Time 22:00-00:00 24 May 98 00:00-00:30 00:30-01:30 01:30-02:30 02:30-03:30 03:30-04:00 04:00-06:00 06:00-07:30 07:30-08:30 08:30-09:00 09:00-10:30 10:30-10:45 10:45-12:00 12:00-12:30 12:30-15:30 15:30-16:30 16:30-18:15 18:15-18:30 18:30-19:30 19:30-20:30 20:30-00:00 25 May 98 00:00-00:30 00:30-06:00 06:00-11:00 11:00-12:00 12:00-12:30 12:30-13:00 13:00-00:00 26 May 98 00:00-01:30 O1:30-02:00 02:00-03:30 03:30-05:30 05:30-06:00 06:00-10:00 10:00-12:00 12:00-12:30 12:30-14:30 14:30-18:30 18:30-19:30 19:30-21:00 21:00-21:30 21:30-00:00 27 May 98 00:00-00:30 00:30-03:30 03:30-06:00 06:00-06:30 06:30-07:00 07:00-07:30 07:30-09:00 09:00-10:00 10:00-10:15 10:15-12:00 12:00-12:30 12:30-15:30 Duration 2hr 1/2 hr 1 hr lhr lhr 1/2 hr 2hr 1-1/2 hr lhr 1/2 hr 1-1/2 hr 1/4hr 1-1/4 hr 1/2 hr 3hr lhr 1-3/4 hr 1/4 hr lhr lhr 3-1/2 hr 1/2 hr 5-1/2 hr 5hr lhr 1/2 hr 1/2 hr llhr 1-1/2 hr 1/2 hr 1-1/2 hr 2hr 1/2 hr 4hr 2hr 1/2 hr 2hr 4 hr 1 hr 1-1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 3 hr 2-1/2 hr 1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 1 hr 1/4 hr 1-3/4 hr 1/2 hr 3 hr Activity Made up BHA no. 2 Held safety meeting Made up BHA no. 2 R.I.H. to 2149.0 ft Serviced Block line Tested Kelly cocks Drilled installed equipment - DV collar Drilled installed equipment - DV collar (cont...) R.I.H. to 3561.0 ft Washed to 3601.0 ft Circulated at 3601.0 ft Tested Casing Investigated pressure change Held safety meeting Investigated pressure change Tested Casing Drilled cement to 3700.0 ft Drilled to 3720.0 ft Circulated at 3720.0 ft Performed formation integrity test Drilled to 3971.0 ft Held safety meeting Drilled to 4305.0 ft Drilled to 4701.0 ft (cont...) Circulated at 4701.0 ft Pulled out of hole to 3687.0 ft R.I.H. to 4657.0 ft Drilled to 5584.0 ft Pulled out of hole to 3687.0 ft Held safety meeting Pulled out of hole to 179.0 ft Pulled BHA Made up BHA no. 3 Made up BHA no. 3 (cont...) R.I.H. to 1833.0 ft Held safety meeting R.I.H. to 5584.0 ft Drilled to 5791.0 ft Circulated at 5791.0 ft Pulled out of hole to 3453.0 ft Flow check Rigged down Tubing head spool Held safety meeting Repaired Tubing head spool Repaired Tubing head spool Installed BOP test plug assembly Tested Casing spool Retrieved BOP test plug assembly Removed DST downhole equipment R.I.H. to 3687.0 ft Circulated at 3687.0 ft R.I.H. to 5791.0 ft Held safety meeting Drilled to 6035.0 ft Progress Report Facility Lis DS 02 Well L2-11 Rig (null) Page 3 Date 21 July 98 Date/Time 15:30-18:00 18:00-20:30 20:30-23:15 23:15-23:30 23:30-00:00 28 May 98 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-16:30 16:30-17:00 17:00-17:30 17:30-23:00 23:00-00:00 29 May 98 00:00-00:30 00:30-01:30 01:30-02:30 02:30-04:00 04:00-06:00 06:00-12:00 12:00-12:30 12:30-00:00 30 May 98 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-16:30 16:30-18:00 18:00-21:30 21:30-00:00 31 May 98 00:00-00:30 00:30-01:00 01:00-02:30 02:30-06:00 06:00-07:00 07:00-07:30 07:30-10:30 10:30-12:00 12:00-12:30 12:30-13:30 13:30-14:00 14:00-15:00 15:00-15:30 15:30-16:30 16:30-22:00 22:00-22:30 22:30-00:00 01 Jun 98 00:00-00:30 00:30-04:30 04:30-05:00 05:00-06:00 06:00-07:15 07:15-07:30 07:30-07:45 Duration 2-1/2 hr 2-1/2 hr 2-3/4 hr 1/4hr 1/2 hr 1/2 hr 5-1/2 hr 6hr 1/2 hr 4 hr 1/2 hr 1/2 hr 5-1/2 hr 1 hr 1/2 hr lhr 1 hr 1-1/2 hr 2hr 6hr 1/2 hr 11-1/2 hr 1/2 hr 5-1/2 hr 6hr 1/2 hr 4 hr 1-1/2 hr 3-1/2 hr 2-1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 3-1/2 hr lhr 1/2 hr 3 hr 1-1/2 hr 1/2 hr 1 hr 1/2 hr 1 hr 1/2 hr lhr 5-1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 4hr 1/2 hr 1 hr 1-1/4 hr 1/4 hr 1/4 hr Activity Circulated closed in well at 6035.0 ft Monitor wellbore pressures Circulated closed in well at 6035.0 ft Monitor wellbore pressures Drilled to 6067.0 ft Held safety meeting Drilled to 6400.0 ft Drilled to 6638.0 ft (cont...) Held safety meeting Drilled to 6955.0 ft Monitor wellbore pressures Circulated closed in well at 6955.0 ft Drilled to 7209.0 ft Circulated at 7209.0 ft Held safety meeting Pulled out of hole to 6022.0 ft R.I.H. to 7209.0 ft Circulated at 7209.0 ft Drilled to 7330.0 ft Drilled to 7590.0 ft (cont...) Held safety meeting Drilled to 8002.0 ft Held safety meeting Drilled to 8250.0 ft Drilled to 8414.0 ft (cont...) Held safety meeting Drilled to 8636.0 ft Circulated at 8636.0 ft Pulled out of hole to 3687.0 ft R.I.H. to 7830.0 ft Held safety meeting R.I.H. to 8636.0 ft Circulated at 8636.0 ft Laid down 3500.0 ft of 5in OD drill pipe Laid down 370.0 ft of 5in OD drill pipe (cont...) Flow check Laid down 2615.0 ft of 5in OD drill pipe Pulled BHA Held safety meeting Serviced M.W.D. tool Removed Wear bushing Rigged up Top ram Tested Top ram Rigged up Casing handling equipment Ran Casing to 3687.0 ft (7in OD) Circulated at 3687.0 ft Ran Casing to 4600.0 ft (7in OD) Held safety meeting Ran Casing to 8623.0 ft (7in OD) Rigged up Cement head Circulated at 8623.0 ft Circulated at 8623.0 ft (cont...) Held safety meeting Pumped Fresh water spacers - volume 60.000 bbl Facility Date/Time 02 Jun 98 03 Jun 98 04 Jun 98 05 Jun 98 Progress Report Lis DS 02 Well L2-11 Page 4 Rig (null) Date 21 July 98 07:45-08:00 08:00-09:00 09:00-09:30 09:30-10:00 10:00-10:30 10:30-11:00 11:00-11:30 11:30-12:00 12:00-12:30 12:30-13:30 13:30-15:00 15:00-18:30 18:30-19:00 19:00-19:30 19:30-20:00 20:00-22:30 22:30-00:00 00:00-00:30 00:30-04:00 04:00-05:00 05:00-06:00 06:00-09:00 09:00-12:00 12:00-12:30 12:30-13:00 13:00-14:00 14:00-00:00 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-21:00 21:00-22:00 22:00-00:00 00:00-00:30 00:30-03:00 03:00-04:00 04:00-04:30 04:30-05:30 05:30-06:00 06:00-08:30 08:30-12:00 12:00-12:30 12:30-14:00 14:00-14:30 14:30-18:00 18:00-23:30 23:30-00:00 00:00-00:30 00:30-06:00 06:00-06:30 06:30-10:30 10:30-11:30 11:30-12:00 Duration 1/4 hr 1 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1 hr 1-1/2 hr 3-1/2 hr 1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 1-1/2 hr 1/2 hr 3-1/2 hr lhr lhr 3hr 3 hr 1/2 hr 1/2 hr 1 hr 10 hr 1/2 hr 5-1/2 hr 6 hr 1/2 hr 8-1/2 hr 1 hr 2hr 1/2 hr 2-1/2 hr 1 hr 1/2 hr 1 hr 1/2 hr 2-1/2 hr 3-1/2 hr 1/2hr 1-1/2 hr 1/2hr 3-1/2 hr 5-1/2 hr 1/2 hr 1/2 hr 5-1/2 hr 1/2 hr 4 hr 1 hr 1/2 hr Activity Mixed and pumped slurry - 83.100 bbl Displaced slurry - 331.300 bbl Flow check Rigged down Cement head Rigged up Seal assembly running tool Installed Seal assembly Tested Seal assembly Rigged up High pressure lines Held safety meeting Rigged up Top ram Freeze protect well - 65.000 bbl of Diesel Tested BOP stack Installed Wear bushing Tested Kelly cocks Tested Casing Made up BHA no. 4 Singled in drill pipe to 1055.0 ft Held safety meeting Singled in drill pipe to 4939.0 ft Circulated at 4939.0 ft Singled in drill pipe to 5800.0 ft Singled in drill pipe to 8480.0 ft Drilled cement to 8611.0 ft Held safety meeting Drilled cement to 8636.0 ft Circulated at 8636.0 ft Drilled to 8900.0 ft Held safety meeting Drilled to 9040.0 ft Drilled to 9221.0 ft (cont...) Held safety meeting Drilled to 9509.0 ft Circulated at 9509.0 ft Pulled out of hole to 5500.0 ft Held safety meeting Pulled out of hole to 189.0 ft Pulled BHA Rigged up Logging/braided cable equipment Serviced Block line Held safety meeting Rigged up sub-surface equipment - Drilling tool / logs R.I.H. to 2960.0 ft Held safety meeting R.I.H. to 8328.0 ft Circulated at 8328.0 ft Installed Logging/braided cable equipment Repaired Cable head R.I.H. to 8456.0 ft Held safety meeting Ran logs on tubulars Rigged down Logging/braided cable equipment Pulled out of hole to 0.0 ft Rigged down sub-surface equipment - Drilling tool / logs Made up BHA no. 5 Facility Lis DS 02 Progress Report Well L2-11 Page 5 Rig (null) Date 21 July 98 Date/Time 06 Jun 98 07 Jun 98 08 Jun 98 09 Jun 98 10 Jun 98 11 Jun 98 12:00-12:30 12:30-13:30 13:30-15:00 15:00-19:30 19:30-20:30 20:30-21:00 21:00-00:00 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-00:00 00:00-00:30 00:30-03:30 03:30-06:00 06:00-10:00 10:00-12:00 12:00-12:30 12:30-16:30 16:30-20:00 20:00-23:30 23:30-00:00 00:00-00:30 00:30-02:00 02:00-06:00 06:00-12:00 12:00-12:30 12:30-00:00 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-14:30 14:30-16:00 16:00-22:30 22:30-23:00 23:00-01:00 01:00-06:00 06:00-07:30 07:30-12:00 12:00-12:30 12:30-14:00 14:00-15:30 15:30-21:00 21:00-22:00 22:00-00:00 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-16:30 16:30-17:30 17:30-18:30 Duration 1/2 hr 1 hr 1-1/2 hr 4-1/2 hr 1 hr 1/2 hr 3 hr 1/2 hr 5-1/2 hr 6 hr 1/2 hr 11-1/2 hr 1/2 hr 3 hr 2-1/2 hr 4 hr 2hr 1/2hr 4hr 3-1/2 hr 3-1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 4hr 6hr 1/2 hr 11-1/2 hr 1/2 hr 5-1/2 hr 6hr 1/2 hr 2hr 1-1/2 hr 6-1/2 hr 1/2 hr 2 hr 5 hr 1-1/2 hr 4-1/2 hr 1/2 hr 1-1/2 hr 1-1/2 hr 5-1/2 hr lhr 2hr 1/2 hr 5-1/2 hr 6hr 1/2 hr 4hr lhr 1 hr Activity Held safety meeting Made up BHA no. 5 Functioned Survey instruments R.I.H. to 9256.0 ft Reamed to 9509.0 ft Took MWD survey at 9490.7 ft Drilled to 9605.0 ft Held safety meeting Drilled to 9800.0 ft Drilled to 9974.0 ft (cont...) Held safety meeting Drilled to 10294.0 ft Held safety meeting Drilled to 10418.0 ft Circulated at 10418.0 ft Pulled out of hole to 165.0 ft Downloaded MWD tool Held safety meeting Tested BOP stack Made up BHA no. 6 R.I.H. to 4256.0 ft Tested Kelly cocks Held safety meeting R.I.H. to 10418.0 ft Drilled to 10481.0 ft Drilled to 10545.0 ft (cont...) Held safety meeting Drilled to 10742.0 ft Held safety meeting Drilled to 10890.0 ft Drilled to 10990.0 ft (cont...) Held safety meeting Drilled to 11041.0 ft Circulated at 11041.0 ft Logged hole with LWD: Formation evaluation (FE) from 11041.0 ft to 9 ft R.I.H. to 9648.0 ft Worked toolstring at 9648.0 ft Drilled to 9699.0 ft Drilled to 9712.0 ft (cont...) Pumped out of hole to 197.0 ft Held safety meeting Pulled BHA Made up BHA no. 7 R.I.H. to 9692.0 ft Reamed to 9692.0 ft Drilled to 9711.0 ft Held safety meeting Drilled to 9725.0 ft Drilled to 9725.0 ft (cont...) Held safety meeting Pumped out of hole to 197.0 ft Pulled BHA Downloaded MWD tool i50.0 Progress Report Facility Lis DS 02 Well L2-11 Page 6 Rig (null) Date 21 July 98 Date/Time 18:30-23:00 23:00-00:00 12 Jun 98 00:00-00:30 00:30-01:00 01:00-02:30 02:30-03:00 03:00-03:15 03:15-03:45 03:45-03:50 03:50-04:00 04:00-04:30 04:30-06:00 06:00-10:30 10:30-12:00 12:00-12:30 12:30-15:00 15:00-17:00 17:00-20:00 20:00-21:00 21:00-21:30 21:30-22:30 22:30-00:00 13 Jun 98 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-00:00 14 Jun 98 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-22:30 22:30-00:00 15 Jun 98 00:00-00:30 00:30-02:30 02:30-03:15 03:15-06:00 06:00-06:15 06:15-06:30 06:30-07:30 07:30-08:30 08:30-12:00 12:00-12:15 12:15-12:30 12:30-13:00 13:00-00:00 16 Jun 98 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-00:00 17 Jun 98 00:00-00:30 00:30-01:30 01:30-03:30 Duration 4-1/2 hr lhr 1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 1/4 hr 1/2 hr 0hr 0hr 1/2 hr 1-1/2 hr 4-1/2 hr 1-1/2 hr 1/2 hr 2-1/2 hr 2hr 3hr 1 hr 1/2 hr 1 hr 1-1/2 hr 1/2 hr 5-1/2 hr 6 hr 1/2 hr 11-1/2 hr 1/2 hr 5-1/2 hr 6hr 1/2 hr 10hr 1-1/2 hr 1/2 hr 2 hr 3/4 hr 2-3/4 hr 1/4 hr 1/4 hr lhr lhr 3-1/2 hr 1/4 hr 1/4 hr 1/2 hr llhr 1/2 hr 5-1/2 hr 6hr 1/2 hr 11-1/2 hr 1/2 hr lhr 2 hr Activity Ran Drillpipe in stands to 8606.0 ft Serviced Block line Held safety meeting Ran Drillpipe in stands to 10488.0 ft Circulated at 10467.0 ft Circulated at 10467.0 ft Held safety meeting Pulled Drillpipe in stands to 9930.0 ft Mixed and pumped slurry - 22.000 bbl Displaced slurry - 52.000 bbl Pulled Drillpipe in stands to 9430.0 ft Circulated at 9430.0 ft Pulled Drillpipe in stands to 0.0 ft Tested BOP stack Held safety meeting Tested BOP stack Made up BHA no. 8 R.I.H. to 8607.0 ft Tested Kelly cocks R.I.H. to 9377.0 ft Washed to 9453.0 ft Drilled to 9453.0 ft Held safety meeting Drilled to 9475.0 ft Drilled to 9497.0 ft (cont...) Held safety meeting Drilled to 9690.0 ft Held safety meeting Drilled to 9806.0 ft Drilled to 9945.0 ft (cont...) Held safety meeting Drilled to 10224.0 ft Circulated at 10224.0 ft Held safety meeting Logged hole with LWD: DIR/FE from 10224.0 ft to 9200.0 ft Pulled out of hole to 8600.0 ft Pulled out of hole to 1302.0 ft Pulled out of hole to 190.0 ft (cont...) Pulled BHA Downloaded MWD tool Made up BHA no. 9 R.I.H. to 9390.0 ft Held safety meeting R.I.H. to 10180.0 ft Reamed to 10224.0 ft Drilled to 10633.0 ft Held safety meeting Drilled to 10796.0 ft Drilled to 10866.0 ft (cont...) Held safety meeting Drilled to 11000.0 ft Held safety meeting Drilled to 11026.0 ft Logged hole with LWD: DIR/FE from 11026.0 ft to 10147.0 ft Facility Lis DS 02 Progress Report Well L2-11 Rig (null) Page Date 7 21 July 98 Date/Time 18 Jun 98 19 Jun 98 20 Jun 98 03:30-06:00 06:00-07:30 07:30-08:30 08:30-10:30 10:30-12:00 12:00-12:30 12:30-13:30 13:30-17:30 17:30-22:00 22:00-22:30 22:30-23:00 23:00-00:00 00:00-00:30 00:30-02:30 02:30-03:30 03:30-06:00 06:00-07:00 07:00-10:00 10:00-10:30 10:30-11:00 11:00-12:00 12:00-12:30 12:30-15:30 15:30-20:30 20:30-00:00 00:00-00:30 00:30-02:30 02:30-03:30 03:30-04:00 04:00-05:00 05:00-05:30 05:30-06:00 06:00-10:30 10:30-12:00 12:00-12:30 12:30-14:30 14:30-18:30 18:30-19:30 19:30-20:30 20:30-22:00 22:00-00:00 00:00-00:30 00:30-01:30 01:30-02:00 02:00-03:00 03:00-04:00 04:00-05:15 05:15-05:30 05:30-05:45 05:45-06:00 06:00-07:00 07:00-11:00 11:00-12:00 12:00-12:30 Duration 2-1/2 hr 1-1/2 hr lhr 2 hr 1-1/2 hr 1/2 hr lhr 4hr 4-1/2 hr 1/2 hr 1/2 hr 1 hr 1/2 hr 2hr 1 hr 2-1/2 hr 1 hr 3 hr 1/2 hr 1/2 hr lhr 1/2 hr 3hr 5 hr 3-1/2 hr 1/2 hr 2hr 1 hr 1/2 hr lhr 1/2 hr 1/2 hr 4-1/2 hr 1-1/2 hr 1/2 hr 2hr 4hr 1 hr lhr 1-1/2 hr 2hr 1/2 hr lhr 1/2 hr lhr lhr 1-1/4 hr 1/4 hr 1/4 hr 1/4 hr lhr 4 hr 1 hr 1/2 hr Activity Pulled out of hole to 3346.0 ft Pulled out of hole to 222.0 ft (cont...) Pulled BHA Serviced Block line Rig waited · Equipment Held safety meeting Made up BHA no. 10 R.I.H. to 8862.0 ft Pulled out of hole to 28.0 fl Pulled BHA Made up BHA no. 11 R.I.H. to 2428.0 ft Held safety meeting R.I.H. to 8600.0 ft Circulated at 8600.0 ft R.I.H. to 8862.0 ft Circulated at 8578.0 ft Pulled out of hole to 28.0 ft Pulled BHA Made up BHA no. 12 R.I.H. to 2722.0 ft Held safety meeting R.I.H. to 10785.0 ft Washed to 10863.0 fl Pulled out of hole to 6517.0 ft Held safety meeting Pulled out of hole to 28.0 ft Pulled BHA Serviced Draw works Rig waited · Equipment Made up BHA no. 13 R.I.H. to 1021.0 fl R.I.H. to 10849.0 ft (cont...) Washed to 10862.0 fl Held safety meeting Fished at 10862.0 ft Pulled out of hole to 25.0 fl Pulled BHA Serviced Block line Ran Drillpipe to 965.0 fl (3-1/2in OD) Ran Drillpipe in stands to 5202.0 fl Held safety meeting Ran Drillpipe in stands to 8623.0 fl Circulated at 8623.0 ft Ran Drillpipe in stands to 10850.0 ft Circulated at 10850.0 ft Batch mixed slurry - 17.000 bbl Mixed and pumped slurry - 16.000 bbl Displaced slurry - 59.000 bbl Pulled Drillpipe in stands to 10475.0 ft Circulated at 10475.0 ft Pulled Drillpipe in stands to 965.0 ft Laid down 965.0 ft of 3-1/2in OD drill pipe Held safety meeting Progress Report Facility Lis DS 02 Well L2-11 Page 8 Rig (null) Date 21 July 98 Date/Time 12:30-15:30 15:30-17:30 17:30-21:30 21:30-22:30 22:30-23:30 23:30-00:00 21 Jun 98 00:00-00:30 00:30-01:00 01:00-01:30 01:30-02:30 02:30-05:00 05:00-06:00 06:00-12:00 12:00-12:30 12:30-00:00 22 Jun 98 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-00:00 23 Jun 98 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-13:30 13:30-14:30 14:30-18:00 18:00-18:30 18:30-20:00 20:00-22:00 22:00-00:00 24 Jun 98 00:00-00:30 00:30-05:00 05:00-06:00 06:00-06:30 06:30-07:30 07:30-11:30 11:30-12:00 12:00-12:30 12:30-17:30 17:30-20:30 20:30-21:30 21:30-23:00 23:00-03:00 25 Jun 98 03:00-04:30 04:30-06:00 06:00-09:30 09:30-11:00 11:00-12:00 12:00-12:30 12:30-15:00 15:00-17:30 17:30-18:00 18:00-18:30 Duration 3hr 2 hr 4 hr 1 hr 1 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1 hr 2-1/2 hr 1 hr 6 hr 1/2 hr 11-1/2 hr 1/2 hr 5-1/2 hr 6 hr 1/2 hr 11-1/2 hr 1/2 hr 5-1/2 hr 6 hr 1/2 hr lhr 1 hr 3-1/2 hr 1/2 hr 1-1/2 hr 2 hr 2 hr 1/2 hr 4-1/2 hr lhr 1/2 hr 1 hr 4 hr 1/2 hr 1/2 hr 5 hr 3 hr 1 hr 1-1/2 hr 4 hr 1-1/2 hr 1-1/2 hr 3-1/2 hr 1-1/2 hr lhr 1/2 hr 2-1/2 hr 2-1/2 hr 1/2 hr 1/2 hr Activity Tested BOP stack Made up BHA no. 14 R.I.H. to 8623.0 ft Circulated at 8623.0 ft R.I.H. to 10475.0 ft Washed to 10485.0 ft Held safety meeting Washed to 10522.0 ft Circulated at 10522.0 ft Pulled out of hole to 8623.0 ft Circulated at 8623.0 ft R.I.H. to 10478.0 ft Drilled to 10526.0 ft Held safety meeting Drilled to 10550.0 ft Held safety meeting Drilled to 10640.0 ft Drilled to 10789.0 ft (cont...) Held safety meeting Drilled to 11055.0 ft Held safety meeting Drilled to 11200.0 ft Drilled to 11389.0 ft (cont...) Held safety meeting Drilled to 11485.0 ft Circulated at 11485.0 ft Logged hole with LWD: DIR/FE from 11485.0 ft to 10189.0 ft Pulled out of hole to 8623.0 ft R.I.H. to 11485.0 ft Circulated at 11485.0 ft Pulled out of hole to 8424.0 ft Held safety meeting Pulled out of hole to 200.0 ft Pulled BHA Downloaded MWD tool Rigged up Handling equipment Ran Liner to 2994.0 ft (4-1/2in OD) Installed Tubing handling equipment Held safety meeting Ran Tubing to 2874.0 ft (2-7/8in OD) Ran Drillpipe to 8611.0 ft (3-1/2in OD) Circulated at 8611.0 ft Ran Drillpipe in stands to 11484.0 ft Circulated at 11484.0 ft Rigged up Cement unit Circulated at 11350.0 ft Circulated at 11350.0 ft Pulled Drillpipe in stands to 8458.0 ft Commissioned Block line Held safety meeting Commissioned Block line Pulled Drillpipe in stands to 2865.0 ft Installed Tubing handling equipment Pulled Tubing in stands to 2299.0 ft Progress Report Facility Lis DS 02 Well L2-11 Rig (null) Page 9 Date 21 July 98 Date/Time 26 Jun 98 27 Jun 98 28 Jun 98 18:30-19:30 19:30-21:30 21:30-22:30 22:30-23:00 23:00-06:00 06:00-10:30 10:30-11:00 11:00-11:30 11:30-12:30 12:30-13:00 13:00-20:30 20:30-21:00 21:00-23:00 23:00-00:00 00:00-06:00 06:00-08:00 08:00-10:00 10:00-12:00 12:00-12:30 12:30-21:30 21:30-23:30 23:30-02:30 02:30-04:00 04:00-06:00 06:00-08:30 08:30-12:00 12:00-12:30 12:30-13:30 13:30-16:00 16:00-19:00 Duration lhr 2hr lhr 1/2 hr 7hr 4-1/2 hr 1/2 hr 1/2 hr lhr 1/2 hr 7-1/2 hr 1/2 hr 2hr 1 hr 6hr 2hr 2 hr 2hr 1/2 hr 9hr 2 hr 3 hr 1-1/2 hr 2hr 2-1/2 hr 3-1/2 hr 1/2 hr 1 hr 2-1/2 hr 3 hr Activity Serviced Block line Pulled Tubing in stands to 0.0 ft Tested Liner Rigged up Handling equipment Ran Tubing to 3221.0 ft (2-7/8in OD) Ran Drillpipe in stands to 11260.0 ft Held safety meeting Functioned Gun assembly Reverse circulated at 8039.0 ft Held safety meeting Laid down 8006.0 ft of Drillpipe Installed Tubing handling equipment Laid down 1700.0 ft of Tubing Held safety meeting Laid down 1500.0 ft of Tubing Commissioned Kelly Installed BOP stack Rigged up Completion string handling equipment Held safety meeting Ran Tubing to 8463.0 ft (4-1/2in OD) Space out tubulars Reverse circulated at 8463.0 ft Set packer at 8407.0 ft with 4000.0 psi Removed Completion string handling equipment Removed BOP stack Rigged up Xmas tree Held safety meeting Tested Permanent packer Freeze protect well - 85.000 bbl of Diesel Rigged down Rig services 13-Jul-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re' Distribution of Survey Data for Well L2-11 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: 10,520.04' MD Window / Kickoff Survey: 10,522.00' MD Projected Survey: 11,485.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns.('h Regards, William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company Prudhoe Bay Unit Alaska State Plane Zone 4 Lisburne DS 02 L2-11 S UR VEY REPORT 7 July, 1998 Your Reft API-500292288500 Last Survey Date 23-June-98 Job# AKMMS0238 KBE- 50.10' DRILLING C;ERVIr'E5 ORIGINAL. RECEIVED JUN 22 199'8 AJaska Oil & Gas Cons. Commission AqchorBge Survey Ref: svy3494 Prudhoe Bay Unit Measured Depth fit) 10520.04 10522.00 10527.13 10559.34 10591.34 10626.10 10656.93 10688.74 10720.48 10752.54 10784.98 10816.14 10847.51 10880.68 10913.00 10944.96 10977,48 11009.56 11041.04 11074.22 11106.15 11138.33 11170.50 11202.56 11234.72 11266.55 11298.53 11330.38 11362,27 11394.21 88.770 88.779 88.740 90.180 92.770 93.940 94.190 93.570 92.800 92.070 90.580 89.910 89.200 91.510 94.280 96.380 96.570 96.720 93.690 90.590 87.290 86.670 86.610 92.000 93.230 94.830 95.020 94.630 90.860 88.860 102.700 102.683 103.640 102.140 100.980 98.780 95.330 95.200 93.88O 95.580 95.790 94.430 94.900 94.810 93.250 94.180 94.180 94.290 95.260 96.280 96.290 96.500 97.49O 97.790 97.44O 97.290 97.070 96.850 97.190 97.470 Sub-Sea Depth (ft) 8649.48 8649.52 8649.63 8649.93 8649.11 8647.08 8644.89 8642.74 8640.97 8639.61 8638.86 8638.73 8638.97 8638.77 8637.13 8634.17 8630.50 8626.79 8623,93 8622.69 8623.28 8624.98 8626.86 8627.25 8625.79 8623.55 8620.80 8618.12 8616.60 8616.67 Vertical Depth (ft) 8699.58 8699.62 8699.73 8700.03 8699.21 8697.18 8694.99 8692.84 8691.07 8689.71 8688.96 8688.83 8689.07 8688.87 8687.23 8684.27 8680.60 8676.89 8674.O3 8672.79 8673.38 8675.08 8676.96 8677.35 8675.89 8673.65 8670.90 8668.22 8666.7O 8666.77 Sperry-Sun Drilling Services Survey Report for L2-11 Your Ref: API-500292288500 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 1829.66 N 951.68 E 5965182.03 N 693721.56 E 2044.96 1829.23 N 953.59 E 5965181.65 N 693723.48 E 0.981 2045.70 1828.06 N 958.58 E 5965180.61N 693728.51E 18.666 2047.60 1820.88 N 989.98 E 5965174.24 N 693760.08 E 6.455 2059.69 1814.47 N 1021.31E 5965168.63 N 693791.57 E 8.868 2072.37 1808.51 N 1055.50 E 5965163.56 N 693825.89 E 7.159 2087.07 1804.74 N 1086.01 E 5965160.57 N 693856.49 E 11.192 2101.44 1801.82 N 1117.62 E 5965158.47 N 693888.16 E 1.991 2117.15 1799.32 N 1149.21E 5965156.77 N 693919.81E 4.809 2133.18 1796.67 N 1181.13 E 5965154.95 N 693951.78 E 5.766 2149.29 1793.46 N 1213.40 E 5965152.56 N 693984.13 E 4.638 2165.14 1790.69 N 1244.43 E 5965150.59 N 694015.22 E 4.865 2180.63 1788.14 N 1275.70 E 5965148.84 N 694046.54 E 2.714 2196.44 1785.33 N 1308.75 E 5965146.88 N 694079.65 E 6.969 2213.06 1783.06 N 1340.94 E 5965145.44 N 694111.89 E 9.833 2229.63 1781,00 N 1372.69 E 5965144.19 N 694143.69 E 7.181 2246.13 1778.64N 1404.92 E 5965142.67 N 694175.97 E 0.584 2262.65 1776.29 N 1436.70 E 5965141.13 N 694207.79 E 0.578 2278.91 1773.68 N 1467.93 E 5965139.32 N 694239.09 E 10.102 2294.66 1770.35 N 1500.92 E 5965136.84 N 694272.15 E 9.835 2310.81 1766.85 N 1532.65 E 5965134.16 N 694303.95 E 10.335 2326.11 1763.27 N 1564.58 E 5965131.40 N 694335.97 E 2.034 2341.46 1759.36 N 1596.46 E 5965128.31 N 694367.94 E 3.078 2356.51 1755.10 N 1628.22 E 5965124.86 N 694399.80 E 16.838 2371.20 1750.84 N 1660.06 E 5965121.43 N 694431.74 E 3.976 2385.94 1746.77 N 1691.55 E 5965118.16 N 694463.32 E 5.049 2400.64 1742.79 N 1723.16 E 5965115.00 N 694495.02 E 0.907 2415.47 1738.95 N 1754.66 E 5965111.96 N 694526.61 E 1.405 2430.36 1735.05 N 1786.27 E 5965108.88 N 694558.31 E 11.870 2445.26 1730.98 N 1817.95 E 5965105.62 N 694590.08 E 6.323 2460.06 Comment Tie-on Survey Window Point Alaska State Plane Zone 4 Lisburne DS 02 Continued... 7 July, 1998 - 11:16 - 2 - DrillQuest Sperry-Sun Drilling Services Survey Report for L2-11 Your Ref: API-500292288500 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Dogleg 'Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 11425.44 87.630 97.680 8617.63 8667.73 11485.00 87.630 97.680 8620.09 8670.19 1726.86 N 1848.89 E 5965102.30 N 694621.12 E 3.995 2474.40 1718.91 N 1907.87 E 5965095.86 N 694680.28 E 0.000 2501.65 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 34.930° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11485.00ft., The Bottom Hole Displacement is 2568.00ft., in the Direction of 47.982° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 10520.04 8699.58 1829.66 N 951.68 E Tie-on Survey 10522.00 8699.62 1829.23 N 953.59 E Window Point 11485.00 8670.19 1718.91 N 1907.87 E Projected Survey Comment Projected Survey Alaska State Plane Zone 4 Lisburne DS 02 7 July, 1998 - 11:16 - 3 - DrillQuest 13-Jul-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well L2-11PB1 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 'MD 11,041.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, ~"' William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, AJaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company Prudhoe Bay Unit Alaska State Plane Zone 4 Lisburne DS 02 L2-11PB1 SURVEY REPORT ORIG1NAL 7 July, 1998 Your Ref: API-500292288570 Last Survey Date og-June-g8 Job# AKMMS0238 KBE- 50.10' DRILLING SERVICES A DI~'3,.~ION OF DR~£R I~OtJ~"r~lE~,, I,~C RECEIVED JUN 27 1998 {)ii & Gas Cons, Commission A.nchora[le Survey Ref: svy3434 Prudhoe Bay Unit Measured Depth (ft) Incl. 0.00 155.24 238.51 328.39 417.79 5O6.94 595.56 679.53 710.62 772.10 801.97 830.66 860.13 889.54 920.95 949.92 979.82 1069.50 1166.29 1261.66 1357.18 1451.87 1483.66 1515.46 1546.96 1578.72 1610.50 1642.27 1673.02 1704.75 0.000 0.040 0.560 0.730 0.950 1.400 1.020 1.160 1.240 1.820 2.090 2.290 2.270 2.400 2.720 2.930 3.520 3.870 4.300 4.360 4.570 4.560 4.350 4.170 3.990 3.280 2.900 2.760 2.400 1.780 0.000 18.820 127.610 110.310 98.810 108.340 109.760 111.070 100.750 114.960 102.980 104.880 105.350 102.980 102.910 100.390 105.290 106.100 109.240 113.320 111 230 110.450 114.540 110.730 112.450 117.290 114.820 115.040 117.500 116.610 Sub-Sea Depth (ft) -50.10 105.14 188.41 278.28 367.67 456.80 545.40 629.36 660.44 721.90 751.75 780.42 809.87 839.25 870.63 899.57 929.42 1018.91 1115.46 1210.56 1305.79 1400.18 1431.87 1463.58 1495.00 1526.70 1558.43 1590.16 1620.88 1652.59 Vertical Depth (ft) Sperry-Sun Drilling Services Survey Report for L2-11PB1 Your Ref: API-500292288570 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (fi) (fi) (fi) (fi) (°/'~OOft) (fi) 0.00 0.00 N 0.00 E 5963328.55 N 692817.16 E 0.00 155.24 0.05 N 0.02 E 5963328.60 N 692817.18 E 0.026 0.05 238.51 0.17 S 0.35 E 5963328.39 N 692817.51 E 0.689 0.06 328.38 0.64 S 1.23 E 5963327.95 N 692818.41 E 0.286 0.18 417.77 0.95 S 2.50 E 5963327.67 N 692819.68 E 0.309 0.65 506.90 1.40 S 4.26 E 5963327.26 N 692821.46 E 0.549 1.29 595.50 2.01 S 6.03 E 5963326.69 N 692823.24 E 0.430 1.81 679.46 2.57 S 7.53 E 5963326.18 N 692824.75 E 0.169 2.21 710.54 2.74 S 8.16 E 5963326.02 N 692825.38 E 0.740 2.42 772.00 3.28 S 9.69 E 5963325.52 N 692826.94 E 1.120 2.86 801.85 3.60 S 10.65 E 5963325.22 N 692827.90 E 1.635 3.15 830.52 3.87 S 11.72 E 5963324.98 N 692828.97 E 0.742 3.54 859.97 4.17 S 12.85 E 5963324.71 N 692830.11 E 0.093 3.94 889.35 4.47 S 14.01 E 5963324.44 N 692831.28 E 0.551 4.36 920.73 4.78 S 15.38 E 5963324.17 N 692832.66 E 1.019 4.89 949.67 5.07 S 16.78 E 5963323.91 N 692834.06 E 0.842 5.45 979.52 5.45 S 18.41 E 5963323.58 N 692835.71 E 2.176 6.08 1069.01 7.01S 23.98 E 5963322.15 N 692841.31E 0.395 7.98 1165.56 9.11S 30.54 E 5963320.22 N 692847.93 E 0.501 10.02 1260.66 11.73 S 37.25 E 5963317.78 N 692854.70 E 0.329 11.71 1355.89 14.54S 44.13 E 5963315.14 N 692861.65 E 0.278 13.34 1450.28 17.22 S 51.17 E 5963312.65 N 692868.76 E 0.066 15.18 1481.97 18.17 S 53.45 E 5963311.76 N 692871.06 E 1.198 15.71 1513.68 19.08 S 55.63 E 5963310.91N 692873.26 E 1.054 16.21 1545.10 19.90 S 57.71 E 5963310.14 N 692875.37 E 0.691 16.73 1576.80 20.74 S 59.54 E 5963309.35 N 692877.22 E 2.433 17.09 1608.53 21.49 S 61.08 E 5963308.63 N 692878.77 E 1.267 17.35 1640.26 22.15 S 62.50 E 5963308.01 N 692880.21 E 0.442 17.62 1670.98 22.76 S 63.75 E 5963307.43 N 692881.47 E 1.225 17.84 1702.69 23.29 S 64.78 E 5963306.93 N 692882.51 E 1.957 17.99 Comment Alaska State Plane Zone 4 Lisburne DS 02 Continued... 7 July, 1998 - 11:18 - 2 - DrillQuest Prudhoe Bay Unit Measured Depth (ft) 1737.74 1769.29 1801.02 1832.73 1927.70 2023.30 2121.20 2216.16 2247.51 2342.60 2437.63 2532.93 2628.19 2723.72 2818.87 2913.95 3009.26 3104.36 3199.75 3294.54 3390.08 3485.42 3580.70 3650.23 3705.99 3737.69 3769.07 3832.54 3927.58 4O22.80 1,.580 1,410 1.080 0.140 0.510 0.770 0.870 1.020 0.520 1.410 0.480 1.080 1.290 1.180 0.700 0.740 O.79O 0,920 1.280 0,920 1.160 1.24O 0.290 0.580 0.380 0.370 2.800 8.760 9.690 9.990 127.150 123.610 131.720 152.450 314.380 309,700 306.910 313,050 307.680 145.890 209.890 274,990 258.460 257.520 74.740 95.020 99.750 92.130 105.030 97,830 113.320 111,140 254.100 279.640 273.890 314.610 340.230 345,630 348.170 335.750 Sub-Sea Depth (ft) 1685.57 1717.11 1748.83 1780.54 1875.51 1971.10 2068.99 2163.94 2195.28 2290.37 2385.38 2480.68 2575.92 2671.42 2766.57 2861.64 2956,94 3052.03 3147.40 3242.18 3337.70 3433.02 3528.29 3597.82 3653.58 3685.28 3716.64 3779.76 3873.57 3967.40 Vertical Depth (ft) 1735.67 1767.21 1798.93 1830.64 1925.61 2021.20 2119.09 2214.04 2245.38 2340.47 2435.48 253O.78 2626.02 2721.52 2816.67 2911.74 3007.04 3102.13 3197.50 3292.28 3387.80 3483.12 3578.39 3647.92 3703.68 3735.38 3766.74 3829.86 3923.67 4017.50 Sperry-Sun Drilling Services Survey Report for L2-11PB1 Your Ref: API-500292288570 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 23.80 S 65.60 E 5963306,44 N 692883.34 E 1.113 18.05 24.27 S 66.27 E 5963305.98 N 692884.03 E 0.613 18.04 24.69 S 66.81E 5963305.58 N 692884.59 E 1.176 18.01 24.92 S 67.06 E 5963305.36 N 692884.83 E 2.997 17.96 24,73 S 66.81 E 5963305.54 N 692884.58 E 0.679 17.98 24.02 S 66.01E 5963306.23 N 692883.76 E 0.277 18.10 23.16 S 64.91 E 5963307.07 N 692882.64 E 0.110 18.18 22.15 S 63.71 E 5963308.05 N 692881.42 E 0.190 18.33 21.87 S 63.40 E 5963308.32 N 692881.10 E 1.610 18.37 22.57 S 63.71 E 5963307.62 N 692881.43 E 2.010 17.97 23.89 S 64.17 E 5963306.32 N 692881.92 E 1,341 17.16 24.15 S 63.08 E 5963306.02 N 692880.83 E 1.028 16.31 24.29 S 61.13 E 5963305.84 N 692878.89 E 0,419 15.09 24.72 S 59.12 E 5963305.36 N 692876.89 E 0,117 13.58 24.78 S 58.72 E 5963305.29 N 692876.50 E 1.975 13.31 24.68 S 59.89 E 5963305.42 N 692877.67 E 0.270 14.06 24.84 S 61.15 E 5963305.28 N 692878.93 E 0.084 14.65 24.98 S 62.56 E 5963305.18 N 692880.34 E 0.181 15.34 25.29 S 64.36 E 5963304.92 N 692882.14 E 0.456 16.12 25.67 S 66.13 E 5963304.59 N 692883.93 E 0.406 16.82 26.15 S 67.78 E 5963304.15 N 692885.59 E 0.385 17.37 26.91 S 69.63 E 5963303.44N 692887.46 E 0.097 17.81 27.34S 70.36 E 5963303.02 N 692888.20 E 1,555 17.87 27.33 S 69.84E 5963303.02 N 692887.68 E 0.492 17.58 27.27 S 69.38 E 5963303.07 N 692887.22 E 0.368 17.36 27.19 S 69.20 E 5963303.14 N 692887.04 E 0,824 17.33 26.40 S 68.87 E 5963303.92 N 692886.69 E 7.876 17.79 20.26 S 67.15 E 5963310.02 N 692884.80 E 9.419 21.84 5.42 S 63.71 E 5963324.77 N 692880.99 E 1.068 32.04 9.96 N 58.67 E 5963340.01 N 692875.56 E 2.247 41.76 Comment Alaska State Plane Zone 4 Lisburne DS 02 Continued... 7 July, 1998 - 11:18 - 3 - DrillQuest Prudhoe Bay Unit Measured Depth (ft) 4117.99 4181.91 4245.40 4308.39 4403.27 4496.64 4593.31 4654.64 4720.17 4816.09 4911.27 5006.24 5101.41 5196.73 5292.21 5387.34 5482.93 5545.43 5641.30 5736.55 5768.12 5863.32 5958.49 6006.30 6148.94 6243.94 6339.01 6434.38 6530.24 6624.57 14.060 16.740 19.870 22.740 27.080 26.840 26.670 27.130 27.020 26.650 25.860 26.750 26.600 26.370 24.780 22.300 22.430 22.310 22.390 23.540 23.92O 24.330 25.460 26.010 26.040 26.250 26.410 25.700 26.040 24.770 336.690 338.44O 336.360 335.320 334.770 333.330 335.490 337.850 344.600 346.060 346.660 344.650 344.130 343.52O 342.280 338.49O 336.410 336.190 335.880 340.060 340.120 340.080 339.740 340.560 339.810 338.780 339.610 341.050 340.520 342.740 Sub-Sea Depth (ft) 4060.49 4122.11 4182.38 4241.06 4327.O9 4410.31 4496.63 4551.51 4609.69 4695.28 4780.64 4865.78 4950.82 5036.14 5122.26 5209.47 5297.87 5355.67 5444.34 5532.04 5560.94 5647.83 5734.15 5777.22 5905.40 5990.68 6075.89 6161.56 6247.82 6333.03 Vertical Depth (ft) 4110.59 4172.21 4232.48 4291.16 4377.19 4460.41 4546.73 4601.61 4659,79 4745.38 4830.74 4915.88 5000.92 5086.24 5172.36 5259.57 5347.97 5405.77 5494.44 5582.14 5611.04 5697.93 5784.25 5827.32 5955.5O 6O40.78 6125.99 6211.66 6297.92 6383.13 Sperry-Sun Drilling Services Survey Report for L2-11PB1 Your Ref: API-500292288570 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 28.11 N 50.70 E 5963357.96 N 692867.13 E 4.280 52.08 43.81 N 44.25 E 5963373.48 N 692860.27 E 4.255 61.25 62.20 N 36.56 E 5963391.67 N 692852.11E 5.035 71.93 83.07 N 27.18 E 5963412.29 N 692842.20 E 4.595 83.67 119.29 N 10.31 E 5963448.07 N 692824.41 E 4.581 103.70 157.35 N 8.21W 5963485.64 N 692804.91 E 0.745 124.30 196,59 N 27.01W 5963524.39 N 692785.12 E 1.021 145.72 222.15 N 38.02W 5963549.66 N 692773.45 E 1.889 160.36 250.26 N 47.58VV 5963577.51 N 692763.17 E 4.704 177.93 292.15 N 58.55W 5963619.10 N 692751.13 E 0.788 205.99 333.06 N 68.48W 5963659.75 N 692740.15 E 0.876 233.85 373.83 N 78.92W 5963700.23 N 692728.67 E 1.326 261.30 414.98 N 90.42W 5963741.07 N 692716.12 E 0.292 288.45 455.80 N 102.26W 5963781.58 N 692703.24 E 0.374 315.14 495.20 N 114.36W 5963820.65 N 692690.12 E 1.757 340.51 530.99 N 127.05W 5963856.10 N 692676.52 E 3.053 362.59 564.58 N 141.00W 5963889.32 N 692661.72 E 0.839 382.14 586.36 N 150.56W 5963910.85 N 692651.60 E 0.234 394.52 619.67 N 165.37W 5963943.77 N 692635.94 E 0.149 413.35 654.11N 179.27W 5963977.84 N 692621.16 E 2.094 433.63 666.06 N 183.60W 5963989.67 N 692616.53 E 1.206 440.94 702.64N 196.84W 5964025.91 N 692602.35 E 0.431 463.36 740.27 N 210.60W 5964063.17 N 692587.62 E 1.197 486,32 759.79 N 217.65W 5964082.51N 692580.08 E 1.370 498.30 818.67 N 238.87W 5964140.82 N 692557.36 E 0.232 534.42 857.83 N 253.67W 5964179.58 N 692541.56 E 0.526 558.05 897.24 N 268.65W 5964218.60 N 692525,57 E 0.422 581.79 936.68 N 282.75W 5964257.67 N 692510.46 E 0.997 606.05 976.18 N 296.52W 5964296.80 N 692495.69 E 0.429 630.54 1014.57 N 309.29W 5964334.85 N 692481.94 E 1.683 654.71 Comment Alaska State Plane Zone 4 Lisburne DS 02 Continued... 7 July, 1998 - 11:18 - 4 - DrillQuest Prudhoe Bay Unit Measured Depth (ft) Incl. 6720.06 6815.10 6910.27 7005.38 7100.71 7195.84 7291.16 7386.37 7481.69 7577.01 7672.41 7767.48 7862.04 7957.05 8050.86 8146.25 8241.63 8336.89 8432.17 8495.69 8589.45 8628.43 8660.75 8692.79 8724.96 8757.03 8789.24 8821.63 8852:32 8884.72 24,530 24,400 23.870 23,530 23.180 24.150 24.30o 23.340 24.260 23,370 24.020 22,840 21.610 21.420 21,780 24.180 24.280 26.160 28.050 27.350 26.140 25,980 25.880 26,590 28.010 29.090 30.450 32.140 34.64o 36,850 343.o3o 343.250 342.660 342.430 342.010 341.14o 340.360 337.990 337.000 336,800 339.690 339.280 340.310 341.330 339.430 338.430 340.030 341.820 343,320 343.170 344.330 346,000 350.900 359,900 8.330 16.620 25.370 33.640 39.360 42.690 Sub-Sea Depth (ft) 6419.81 6506.32 6593.17 6680.26 6767.78 6854.91 6941.84 7028.94 7116.15 7203.35 7290.71 7377.94 7465.48 7553.87 7641.09 7728.90 7815.88 7902.06 7986.87 8043.11 8126.84 8161.86 8190.93 8219.68 8248.27 8276.46 8304.43 8332.12 8357.75 8364.04 Vertical Depth (ft) 6469.91 6556.42 6643.27 6730.36 6817.88 6905.01 6991.94 7079.04 7166.25 7253.45 7340.81 7428.04 7515.58 7603.97 7691.19 7779.00 7865.98 7952.16 8036.97 8093.21 8176.94 8211.96 8241.03 8269.78 8298.37 8326.56 8354.53 8382.22 8407.85 8434.14 Sperry-Sun Drilling Services Survey Report for L2-11PB1 Your Ref: API-500292288570 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 1052.64 N 321.01W 5964372.60 N 692469.24 E 0.281 679.21 1090.30 N 332.42W 5964409.96 N 692456.86 E 0.167 703.55 1127.51 N 343.83W 5964446.86 N 692444.51 E 0.612 727.52 1163.98 N 355.29W 5964483.02 N 692432.11E 0.370 750.86 1199.96 N 366.83W 5964518.70 N 692419.65 E 0,407 773.75 1236.19 N 378.91W 5964554.61N 692406.65 E 1.084 796.54 1273.11N 391.80W 5964591.19 N 692392.81E 0.371 819.43 1309.05 N 405.45W 5964626.76 N 692378.24 E 1,424 841.07 1344.58 N 420.18W 5964661.90 N 692362.60 E 1.052 861.77 1379.98 N 435.28W 5964696.91 N 692346.60 E 0.938 882.15 1415.59 N 449.48W 5964732.13 N 692331.50 E 1.395 903.21 1450.99 N 462.72W 5964767.19 N 692317.35 E 1,253 924.66 1484.55 N 475.08W 5964800.42 N 692304.13 E 1.364 945.09 1517.46 N 486.53W 5964833.02 N 692291.84 E 0.442 965.52 1549.99 N 498,13W 5964865.24 N 692279.41 E 0.839 985.54 1584.73 N 511.53W 5964899.63 N 692265.12 E 2.549 1006.35 1621.32 N 525.41W 5964935.85 N 692250.31 E 0.696 1028.41 1659.69 N 538.65W 5964973.86 N 692236.09 E 2.130 1052.28 1701.11 N 551.64W 5965014.94 N 692222.04 E 2,109 1078.80 1729.38 N 560.15W 5965042.98 N 692212.81E 1.107 1097.11 1769.88 N 571.96W 5965083.17 N 692199.96 E 1.405 1123.55 1786.43 N 576.35W 5965099.60 N 692195.15 E 1.926 1134.61 1800.27 N 579.18W 5965113.36 N 692191.97 E 6,635 1144.33 1814.35 N 580.29W 5965127.41 N 692190.49 E 12.602 1155.24 1829.03 N 579.21W 5965142.11 N 692191.19 E 12.792 1167.89 1843.96 N 575.89W 5965157.12 N 692194.13 E 12,795 1182.03 1858.84N 570.15W 5965172.15 N 692199.49 E 14,121 1197.52 1873.44 N 561.86W 5965186.95 N 692207.40 E 14,240 1214,24 1886.99 N 551.80W 5965200.75 N 692217.11 E 13.091 1231.10 1901.25 N 539.37W 5965215.33 N 692229.17 E 9,085 1249.91 Comment Alaska State Plane Zone 4 Lisburne DS 02 Continued... 7 July, 1998 - 11:18 - 5 - DrillQuest Prudhoe Bay Unit Measured Depth (ft) Incl. 8917.04 8946.83 8978.94 9011.04 9043.15 9075.51 9107.52 9139.75 9171.78 9204.38 9236.41 9268.76 9300.92 9332.89 9365.18 9397.32 9429.58 9459.22 9490.74 9522.94 9554.90 9587.00 9619.17 9651.31 9683.54 9715.70 9747.75 9779.97 9812.27 9843.69 38.660 4O.43O 43.120 46.170 49.030 51.730 55.300 58.980 62.880 67.370 69.560 69.680 71.690 74.650 77.560 79.750 82.590 86.790 89.410 89.690 89.97O 89.660 86.O6O 84.790 85.310 89.260 92.590 93.080 94.070 92.430 46.160 50.030 54.270 57.810 61.680 65.340 67.900 71.290 74.O00 76.360 79.620 81.920 83.940 85.180 86.110 87.410 88.480 89.640 89.120 88.980 88.880 87.990 87.970 88.730 88.390 91.050 92.270 92.570 92.720 89.830 Sub-Sea Depth (ft) 8409.60 8432.57 8456.52 8479.36 8501.02 8521.65 8540.69 8558.17 8573.74 8587.45 8599.21 8610.47 8621.11 8630.37 8638.12 8644.44 8649.39 8652.14 8653.18 8653.43 8653.53 8653.63 8654.83 8657.40 8660.18 8661.70 8661.18 8659.59 8657.58 8655.80 Vertical Depth (ft) 8459.70 8482.67 8506.62 8529.46 8551.12 8571.75 859O.79 8608.27 8623.84 8637.55 8649.31 8660.57 8671.21 8680.47 8688.22 8694.54 8699.49 8702.24 8703.28 8703.53 8703.63 8703.73 8704.93 8707.50 8710.28 8711.80 8711.28 8709.69 8707.68 8705.90 Sperry-Sun Drilling Services Survey Report for L2-11PB1 Your Ref: API-500292288570 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 1915.37 N 525.51W 5965229.80 N 692242.66 E 8.634 1269.42 1928.02 N 511.40W 5965242.81N 692256.45 E 10.182 1287.88 1941.12 N 494.50W 5965256.34 N 692273.00 E 12.144 1308.30 1953.70 N 475.79W 5965269.40 N 692291.38 E 12.258 1329.32 1965.63 N 455.31W 5965281.85 N 692311.55 E 12.589 1350.83 1976.73 N 433,00W 5965293.51N 692333.57 E 12.061 1372.70 1986,93 N 409.38W 5965304.31N 692356,92 E 12,872 1394.59 1996.35 N 384.01W 5965314.38 N 692382.04 E 14.435 1416.84 2004.68 N 357.29W 5965323.40 N 692408.53 E 14,244 1438.97 2012.23 N 328.71W 5965331.68 N 692436.91 E 15.258 1461.52 2018.43 N 299.57W 5965338.62 N 692465.88 E 11.677 1483.28 2023.29 N 269.64W 5965344.25 N 692495.68 E 6.675 1504.41 2027.02 N 239.53W 5965348.76 N 692525.69 E 8.614 1524.71 2029.92 N 209.07W 5965352.43 N 692556.06 E 9.975 1544.53 2032.30 N 177.82W 5965355.61 N 692587.24 E 9.436 1564.37 2034.08 N 146.36W 5965358.20 N 692618.64 E 7.884 1583.84 2035.22 N 114.50W 5965360.16 N 692650.46 E 9.394 1603.02 2035.70 N 85.00W 5965361.40 N 692679.94 E 14.696 1620.30 2036.04 N 53.50W 5965362.55 N 692711.42 E 8.474 1638.62 2036.58 N 21.31W 5965363.91 N 692743.59 E 0.972 1657.49 2037.17 N 10.64E 5965365.33 N 692775.51 E 0.930 1676.28 2038.05 N 42.73 E 5965367.03 N 692807.57 E 2.936 1695.37 2039.18 N 74.85 E 5965368.98 N 692839.65 E 11.191 1714.69 2040.11 N 106.88 E 5965370.73 N 692871,64E 4,601 1733.78 2040.91N 138.98 E 5965372.36 N 692903.71E 1.926 1752.82 2041.07 N 171.09 E 5965373.34N 692935.81 E 14.802 1771.34 2040.14 N 203.12 E 5965373.23 N 692967.85 E 11.065 1788.91 2038.78 N 235.27 E 5965372.70 N 693000.03 E 1.783 1806.21 2037.29 N 267.47 E 5965372.04 N 693032.26 E 3.100 1823.43 2036.60 N 298.83 E 5965372.15 N 693063.62 E 10.563 1840.81 Comment Alaska State Plane Zone 4 Lisburne DS 02 Continued... 7 July, 1998- 11:18 - 6- DrillQuest Prudhoe Bay Unit Measured Depth (ft) Incl. 9875.88 9907.92 9939.96 9971.91 10004.62 10036.15 10068.15 10100.21 10132.23 10164.40 10196.33 10228.48 10260.90 10292.95 10324.91 10351.41 10389.42 10421.59 10453.85 1 0485.80 10518.03 10550.17 10581.73 10613.93 10646.02 10679.31 10710.43 10742.34 10774.55 10807.05 89.720 88.280 88.400 90.060 90.120 87.780 88.210 88.710 89.780 90.250 90.400 87,200 85.620 86.490 87.470 88.000 88.370 88.270 88.490 88,950 90.590 93,030 92.740 92.720 92.070 89.140 90,370 91.760 94,540 94.990 91.060 91.540 91.630 93.330 92,960 93.420 93.220 93.200 93.770 93.680 94.190 93.450 93.520 93.720 94.160 94.140 94.720 95,450 94.690 95.570 95.660 96.650 96.010 95.610 95.730 96,710 96.280 97.860 99.000 98,830 Sub-Sea Depth (ft) 8655.19 8655.75 8656.68 8657.11 8657.06 8657.63 8658.75 8659.62 8660.04 8660.03 8659.85 8660.52 8662.55 8664.76 8666.44 8667.49 8668.69 8669.63 8670.55 8671.26 8671.39 8670.37 8668.79 8667.25 8665.91 8665.56 8665.69 8665.10 8663.33 8660,63 Vertical Depth (ft) 8705.29 8705.85 8706.78 8707.21 8707.16 8707.73 8708.85 8709.72 8710.14 8710.13 8709.95 8710.62 8712.65 87!4.86 8716.54 8717.59 8718.79 8719.73 8720.65 8721.36 8721.49 8720.47 8718.89 8717.35 8716.01 8715.66 8715.79 8715.20 8713.43 8710.73 Sperry-Sun Drilling Services Survey Report for L2-11PB1 Your Ref: API-500292288570 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 2036.35 N 331.01E 5965372.72 N 693095.80 E 9.245 1859.03 2035.62 N 363.04 E 5965372.82 N 693127.83 E 4.737 1876.77 2034.73 N 395.05 E 5965372.75 N 693159.86 E 0.468 1894.38 2033.35 N 426.97 E 5965372.19 N 693191.80 E 7.436 1911.52 2031.56 N 459.63 E 5965371.23 N 693224.49 E 1.146 1928.75 2029.80 N 491.10 E 5965370.29 N 693256.00 E 7.563 1945.33 2027.95 N 523.03 E 5965369.26 N 693287.96 E 1.482 1962.09 2026.16 N 555.02 E 5965368.28 N 693320.00 E 1.561 1978.94 2024.21 N 586.98 E 5965367.16 N 693351.99 E 3.786 1995.64 2022.12 N 619.08 E 5965365.89 N 693384.14 E 1.488 2012.31 2019.93 N 650.94 E 5965364.52 N 693416,04 E 1.665 2028.75 2017.79 N 683.00 E 5965363.20 N 693448.15 E 10.216 2045.36 2015.82 N 715.30 E 5965362.07 N 693480.49 E 4.878 2062.24 2013.80 N 747,21 E 5965360.87 N 693512.44 E 2.785 2078.85 2011.61 N 779.05 E 5965359.49 N 693544.32 E 3.360 2095.29 2009.69 N 805.46 E 5965358.25 N 693570.77 E 2.001 2108.64 2006.76 N 843.34 E 5965356.29 N 693608.71 E 1.809 2128.12 2003.91 N 875.37 E 5965354.27 N 693640.81 E 2.289 2144.12 2001.06 N 907.49 E 5965352.24 N 693672.99 E 2.452 2160.18 1998.20 N 939.30 E 5965350.20 N 693704.86 E 3.107 2176.05 1995.05 N 971.37 E 5965347.87 N 693737.01 E 5.096 2191.83 1991.61 N 1003.31 E 5965345.25 N 693769.02 E 8.192 2207.29 1988.13 N 1034.64E 5965342.58 N 693800.43 E 2.224 2222.38 1984.87 N 1066.64E 5965340.15 N 693832.50 E 1.242 2238.03 1981.71N 1098.54E 5965337.80 N 693864.48 E 2.060 2253.70 1978.10 N 1131.63 E 5965335.04N 693897.65 E 9.281 2269.69 1974.58 N 1162.55 E 5965332.32 N 693928.65 E 4.187 2284.51 1970.65 N 1194.21 E 5965329.21 N 693960.40 E 6.594 2299.42 1965.94N 1226.02 E 5965325.31 N 693992.32 E 9.326 2313.77 1960.92 N 1258.02 E 5965321.11 N 694024,43 E 1.479 2327.97 Comment Alaska State Plane Zone 4 Lisburne DS 02 Continued... 7 July, 1998- 11:18 - 7- DrillQuest Sperry-Sun Drilling Services Survey Report for L2-11PB1 Your Ref: API-500292288570 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 10839.77 93.300 98.390 8658.27 8708.37 10873.16 92.830 98.390 8656.48 ' 8706.58 10903.08 95.370 99.950 8654.34 8704.44 10936.30 95.180 100.410 8651.29 8701.39 10966.98 93.640 100.340 8648.93 8699.03 11041.00 93.640 100.340 8644.23 8694.33 1956.04 N 1290.28 E 5965317.06 N 694056.81 E 5.336 2342.44 1951.17 N 1323.27 E 5965313.04 N 694089.91E 1.408 2357.34 1946.42 N 1352.73 E 5965309.04 N 694119.48 E 9.955 2370.31 1940.57 N 1385.28 E 5965304.03 N 694152.18 E 1.493 2384.16 1935.06 N 1415.37 E 5965299.30 N 694182.40 E 5.025 2396.87 1921.80 N 1488.04 E 5965287.91N 694255.39 E 0.000 2427.61 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 34.930° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11041.00ft., The Bottom Hole Displacement is 2430.55ft., in the Direction of 37.750° (True). Comments Measured Depth (ft) 0.00 11041.00 Station Coordinates TVD Northings Eastings Comment (ft) (ft) (ft) 0.00 0.00 N 0.00 E Tie-in Survey at Surface 8694.33 1921.80 N 1488.04 E Projected Survey Comment Projected Survey Alaska State Plane Zone 4 Lisburne DS 02 7 July, 1998 - 11:18 - 8 - DrillQuest 0 Ft I I--I-I N 13 SEFt~JICE S 13-Jul-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well L2-11PB2 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 9,429.58' MD 9,459.22' MD 11,026.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ! Naska Oit & Gas Cons. Commission knct,,oracje 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company Prudhoe Bay Unit Alaska State Plane Zone 4 Lisburne DS 02 L2-11PB2 S UR VEY REPORT 7 July, 1998 Your Reft API-500292288571 Last Survey Date 16-June-98 Job # AKMMS0238 KBE- 50.10' DRILLING SERVICE:: .,,. o1~."131o:,1 o~ ol~za=i:l~ l,wousq'allcs, ORIGINAL RECEIVED JUN 22 1998 AJaska 0ii & Gas Cons. Commission A~]chomge Survey Reft svy3482 Prudhoe Bay Unit Measured Depth (ft) Incl. 9429.58 9459.22 · 9491.33 9521.97 9553.95 9586.10 9618.34 9651.92 9683.71 9715.95 9747.77 9779.03 9811.40 9843.74 9875.79 9908.11 9940.40 9972.65 10004.68 10037.06 10068.90 10100.92 10133.34 1 Ol 66.87 lol 98.00 10230.96 10262.35 10294.64 10326.71 10359.03 82,590 86.790 83.740 81.120 80.470 83.110 87.350 92,470 96.870 96.850 94.250 93.480 90.090 90.120 90,890 91.910 93.260 92.220 89.720 89.510 89.070 91.230 92.250 92.310 92.000 92,500 91,360 90.740 90.430 89.910 88.48O 89.640 89.000 93,430 95.930 97.580 99.540 101,640 101.410 100.670 101.710 101.750 101.640 101.840 103.340 102.730 103,490 102.700 102.870 103,490 103,340 103.130 102,940 103.200 102.440 103.o0o 102.290 lO2.59o lO2.770 102.86o Sub-Sea Depth (ft) 8649.39 8652.14 8654.79 8658.83 8663.94 8668.53 8671.21 8671.27 8668.68 8664.83 8661.75 8659.64 8658.63 8658.58 8658.29 8657.50 8656.05 8654.51 8653.96 8654.18 8654.58 8654.49 8653.51 8652.17 8651.00 8649.71 8648.65 8648.06 8647.73 8647.64 Vertical Depth (ft) 8699.49 8702.24 8704.89 8708.93 8714.04 8718.63 8721.31 8721.37 8718.78 8714.93 8711.85 8709.74 8708.73 8708.68 8708.39 8707.60 8706.15 8704.61 8704.06 8704.28 8704.68 8704.59 8703.61 8702.27 8701.10 8699.81 8698.75 8698.16 8697.83 8697.74 Sperry-Sun Drilling Services Survey Report for L2-11PB2 Your Ref: API-500292288571 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 2035.22 N 114.50W 5965360.16 N 692650.46 E 1603.24 2035.70 N 85.00W 5965361.40 N 692679.94 E 14.696 1620.52 2036.08 N 53.01W 5965362.60 N 692711.91E 9.704 1639.15 2035.44 N 22.65W 5965362.74 N 692742.27 E 16.688 1656.00 2032.87 N 8,81 E 5965360.97 N 692773.79 E 7.980 1671.90 2029.12 N 40.40 E 5965358.04 N 692805.47 E 9.656 1686.91 2024.34 N 72.16 E 5965354.08 N 692837.34 E 14.479 1701.17 2018.17 N 105.16 E 5965348.76 N 692870.49 E 16.479 1715.00 2011.84 N 136.20 E 5965343.22 N 692901.68 E 13.860 1727.58 2005.71 N 167.61 E 5965337.90 N 692933.24 E 2.280 1740.54 1999.57 N 198.68 E 5965332.56 N 692964.45 E 8.795 1753.28 1993.23 N 229.22 E 5965327.00 N 692995.14 E 2.466 1765.56 1986.67 N 260.90 E 5965321.26 N 693026.98 E 10.478 1778.32 1980.09 N 292.56 E 5965315.49 N 693058.80 E 0.625 1791.05 1973.10 N 323.84 E 5965309.31 N 693090.25 E 5.261 1803.22 1965.81 N 355.31 E 5965302.84 N 693121.90 E 3.677 1815.27 1958.50 N 386.73 E 5965296.33 N 693153.49 E 4.797 1827.25 1951.20 N 418.10 E 5965289.84 N 693185.05 E 4.048 1839.23 1944.11 N 449.33 E 5965283.56 N 693216.45 E 7.823 1851.29 1936.73 N 480.86 E 5965276.99 N 693248.15 E 2.022 1863.29 1929.34 N 511.83 E 5965270,40 N 693279.30 E 1,460 1874.96 1922.01N 542.99 E 5965263.87 N 693310.65 E 6.778 1886.79 1914.71 N 574.56 E 5965257.37 N 693342.39 E 3.200 1898.87 1907.13 N 607.20 E 5965250.64 N 693375.21 E 0.795 1911.34 1900.23 N 637.53 E 5965244.51 N 693405.71 E 2,635 1923.04 1892.98 N 669.66 E 5965238.09 N 693438.01E 2,277 1935.48 1886.11 N 700.27 E 5965232.01 N 693468.79 E 4.278 1947.37 1879.15 N 731.79 E 5965225.87 N 693500.48 E 2,133 1959.72 1872.11 N 763.08 E 5965219.63 N 693531.94E 1.118 1971.86 1864.95 N 794.60 E 5965213.28 N 693563.63 E 1.633 1984.02 Comment Tie-on Survey Window Point Alaska State Plane Zone 4 Lisburne DS 02 Continued... 7 July, 1998 - 11:11 - 2 - DrillQuest Sperry-Sun Drilling Services Survey Report for L2-11PB2 Your Ref: API-500292288571 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (rt) (ft) (ft) (°/looff) (ft) 10391.27 89.780 103.170 8647.72 8697.82 10423.53 89.480 102.660 8647.93 8698.03 10455.78 89.170 102.360 8648.31 8698.41 10487.96 88,950 102.330 8648.84 8698.94 10520.04 88.770 102,700 8649.48 8699.58 10551.91 88.920 102.420 8650.12 8700.22 10582.87 88.890 103.040 8650.71 8700.81 10615.56 88.650 103.330 8651.41 8701.51 10647.57 90.220 104.600 8651.73 8701.83 10679.49 91.540 104.990 8651.24 8701.34 10711.74 91.600 106.070 8650.36 8700.46 10743.79 90.120 105,480 8649.87 8699.97 10775.45 89.380 105.510 8650.01 8700.11 10807.38 90.090 106.500 8650.16 8700.26 10839.63 92.590 106.500 8649.41 8699.51 10871.57 94.190 107.110 8647.52 8697.62 10903.66 94.570 106.970 8645.07 8695.17 10935.81 93.800 105.770 8642.72 8692.82 11026.00 93.800 105.770 8636.74 8686.84 1857.68 N 826.01E 5965206.82 N 693595.22 E 1.043 1996.05 1850.47 N 857.45 E 5965200.42 N 693626.83 E 1.834 2008.13 1843,49 N 888.93 E 5965194.25 N 693658.49 E 1.338 2020.43 1836.61 N 920.36 E 5965188.18 N 693690.08 E 0.690 2032.78 1829.66 N 951.68 E 5965182.03 N 693721.56 E 1.282 2045.00 1822.73 N 982.78 E 5965175.90 N 693752.83 E 0,997 2057.13 1815.91N 1012.97 E 5965169.86 N ' 693783.19 E 2.005 2068.82 1808.46 N 1044.79 E 5965163.23 N 693815.19 E 1.151 2080.92 1800.73 N 1075.85 E 5965156.30 N 693846.44 E 6.308 2092.37 1792.58 N 1106.71 E 5965148,95 N 693877.50 E 4.312 2103.35 1783.95 N 1137.77 E 5965141.11 N 693908.77 E 3.353 2114.05 1775.24 N 1168.61E 5965133.20 N 693939.82 E 4,971 2124.56 1766.78 N 1199.12 E 5965125.52 N 693970.54 E 2.339 2135.09 1757.98 N 1229.81 E 5965117.51 N 694001.44 E 3,815 2145.44 1748.82 N 1260.72 E 5965109.15 N 694032.58 E 7.752 2155.63 1739.60 N 1291.24 E 5965100.72 N 694063.33 E 5.360 2165.54 1730.23 N 1321.83 E 5965092.13 N 694094.15 E 1,262 2175.36 1721.19 N 1352.60 E 5965083.89 N 694125.13 E 4.427 2185.56 1696.73 N 1439.20 E 5965061.66 N 694212.34E 0,000 2215.08 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 34.920° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11026.00ft., The Bottom Hole Displacement is 2224.90ft., in the Direction of 40.305° (True). Comment Projected Survey Alaska State Plane Zone 4 Lisburne DS 02 Continued... 7 July, 1998 - 11:11 - 3 - DrillQuest Prudhoe Bay Unit Sperry-Sun Drilling Services Survey Report for L2-11PB2 Your Ref: API-500292288571 Alaska State Plane Zone 4 Lisburne DS 02 Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 9429.58 8699.49 2035.22 N 114.50 W 9459.22 8702.24 2035.70 N 85.00 W 11026.00 8686.84 1696.73 N 1439.20 E Comment Tie-on Survey Window Point Projected Survey 7 July, 1998 - 11:11 - 4 - DrillQuest 06/23/~8 11:43 FAX ~07 $64 $1~3 BP EXPLORATION ~ A0~CC ~001 d rv!ces rill ng To: From: Subject: Permit #: Blair Wondzell Allen Sherritt, ODE, SSD MB 8-1 Extendinq L2-11 TD by -570' MD. 98-96 Date: June 23, 1998 Casing depths; 9 5/8"at 3,688' MD, 7" at 8,623' MD, 6" Open hole to 10,910' MD. Well L2-11 will be drilled as an Ultra-SlimHole horizontal producer targeting Zone lB. The conductor has been pre- installed and the 9 5/8" surface easing was set @ -3688'MD/3686'TVD. The 8-1/2" well bore buiIt and held a tangent angle of -24 degrees to 7" easing point, 10 ft into the Sag River @ 8623'MDI8207'TVD. The 6" hole was landed at horizontal in Zone 1 @ 9490'MDf8703~. The horizontal section was drilled to 11041'.M_D/$693'TVD were the decision was made to plug back and re-drill the horizontal section at a higher TVD, This was based on the poor quality of sands drilled along the ~ansition of Zone 1 and Kavik formation (8710' to 8721"TVD). The rig is currently drilling ahead in Zone I @ iO,910'MD/8687'TVD. The plan forward is to extend the proposed TD Eom 10,S78'MD to ~ll,450'MD. The objective is to accumulate approximately 800' of producible sand. Target formation will remain Zone 1. Mr. Blair Wondzel] verbally approved the adjustment to L2-11 on 6/22/98, / I~nlhng Enganecr Approved by: ~/ Sr. DVri{l-ing Engineer 06/09/98 15:18 FAX 907 564 5193 BP EXPLORATION ~ AOGCC ~001 BP EXPLORATION To: Blair Wondzell From: Allen Sherritt, ODE, SSD Subject: Gt~ologic Plugback #1 L2-11 Permit#' 98-96 MB 8-1 Date: June 9,1998 Casing depths: 9 5/8"at 3,688' MD, 7" at 8,623' MD, 6" Open hole to 11,041' MD. Well L2-11 will be drilled as an Ultra-SlimHole horizontal producer targeting Zone lB. The conductor has been pre-installed and the 9 5/8" surface casing was set @ ~3688'MD/3686"TVD. The 8-1/2" well bore built and held a tangent angle of -24 degrees to 7" casing point, 10 ft into the Sag River @ 8623'MD/8207'TVD. The 6" hole was landed at horizontal in Zone 1 @ 9490'MD/8703q'VD. The horizontal section was drilled to 11041'MD/8693q'VD were the decision was made to plug back and re-drill the horizontal section at a higher TVD. This was based on the poor quality of sands drilled along the transition of Zone 1 and Kavik formation (8710' to 8721 'TVD). The plan forward is, pull back to 9680'MD/8710'TVD and perform an open hole sidetrack in 6' hole. The well be re-drilled ~5' to 10' higher TVD (8705'TVD) along the full wellbore in Zone 1. The final bottom hole location will not change. Planned TD for the Ultra-SlimHole horizontal producer is 10,878'. Mr. Blair Wondzell verbally approved the adjustment to L2-11 on 6/9/98. Approved by: Hole ST. ~ @ 9680' MD/8710'TVD Planed 6" ST. @ 8705'TVD. Previous 6" hole TD ,,,10,878'MD ,r MEMORANDUM TO' .,. David Johnst~, Chairman State of Alaska Alaska Oil and Gas Conservation Commission DATE- May 23, 1998 THRU: Blair Wondzell, P. I. Supervisor d;~ ~" FROM' Lou Grimaldi,~¢~"~ SUBJECT: Petroleum Inspector FILE NO' ADFJEWFE.DOC BOPE Test Doyon 9 PBU #DS L2-11 PTD #98-96 Saturday, May 23, 1998: I witnessed the weekly BOPE test on Doyon rig #9 which was drilling Arco well #DS L2-11 in the Lisburne field. I had been waiting on Nabors 22E to get ready to test and managed to fit this rig in. The rig was ready to test when I arrived and the test was started immediately. All BOPE equipment was tested and passed with the exception of the #3 valve inside the hydraulic choke on the choke manifold, which leaked, was greased, cycled and retested "OK". The rig and its surrounding area were well kept and provided good access. Tim Krupa (Doyon Toolpusher) was on hand and provides for a good test of this rigs BOP equipment. SUMMARY' I witnessed the weekly test of the BOPE on Doyon rig #9 drilling Arco well #L2-11 in the Lisburne field. There was one failure observed. Test time 3 1/2 hours. Attachments: ADFJEWFE.XLS CC: (Shared Services Drilling) NON-CONFIDENTIAL STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: Test: Initial X Workover: DATE: Doyon Rig No. 9 PTD # 98-96 Rig Ph.# ARCO Rep.' Phil Smith DS L2-11 Rig Rep.' Tim Krupa Set @ Location' Sec. 18 T. 11N R. 15E Meridian Umiat Weekly X Other 5/23/98 659-4831 TEST DATA: MISC. INSPECTIONS: Location Gen.: P Housekeeping: P (Gen) PTD On Location P Standing Order Posted P BOP STACK: Quan Annular Preventer Pipe Rams 1 Lower Pipe Rams 1 Blind Rams 1 Choke Ln. Valves HCR Valves 2 Kill Line Valves Check Valve Visual P P P P P MUD SYSTEM: Trip Tank Pit Level Indicators Flow Indicator Meth Gas Detector H2S Gas Detector Well Sign P Drl. Rig P Hazard Sec. P Test Press. P/F 250/3000 P 500/5, 000 500/5,000 P P 500/5,000 500/5,000 500/5,000 P 5OO/5, OOO P N/A Alarm P FLOOR SAFETY VALVES: Upper Kelly / IB©P Lower Kelly / IBOP Ball Type Inside BOP Test Quan. Pressure P/F 1 500/5,000 P 500/5,000 P 500/5,000 P 500/5,000 P CHOKE MANIFOLD: No. Valves 15 No. Flanges Manual Chokes Hydraulic Chokes ~ Test Pressure P/F 500/5,000 P 38 500/5,000 P 1 P Functioned Functioned ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure 0 System Pressure Attained 2 Blind Switch Covers: Master: Nitgn. Btl's: Five Bottles 2150 Average 3,000 P 1,750 P minutes 45 sec. minutes 35 sec. P Remote: P Psig. TEST RESULTS Number of Failures: '~ ,Test Time: 3,5 Hours. Number of valves tested 2'~ Repair or Replacement of Failed Equipment will be made within N/A days. otify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Inside hydraufic choke valve (#3) leaked, repair and retest. Distri buti o n: orig-Well File c - Oper./Rig c - Database c - Trip Rpt File c -Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Louis R. Grimaldi F1-021 L (Rev. 12/94) Adf]ewfe.xls TONY KNOWLES, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Y, lav 14. 1998 Tim A. Bums Senior Drilling Engineer BP Exploration (Alaska) Inc. POBox196612 Anchorage, AK 99519-6612 Prudhoe Bay Unit 18L2-11 BP Exploration (Alaska) Inc. Permit No. 98-096 Sur. Loc. 1432'NSL. 1119'EWL Sec. 18. T11N. R15E. UM Btmnhole Loc. 3339'NSL. 2485~,VEL. Sec. 18. T1 IN. R15E. kTvl Dear Mr. Bums' Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a rcpresentative of the Commission max' witness the test. Notice mav be given bx' contacting the.?9...mmission petroleum field inspector on the North Chairman ~ - BY ORDER OF THE COMMISSION 32' enclosures cc: Department offish & Game. tlabitat Section w,,o encl. Department of Environmental Conservation w.'o encl. STATE OF ALASKA ALASKA Old AND GAS CONSERVATION COMN~SSION PERMIT TO DRILL 20 AAC 25.005 la. Typeofwork [~;i~Drill FIRedrill Ilb. Typeofwell FI Exploratory FI Stratigraphic Test [~ Development Oil [] Re-Entry [] Deepenl [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska Inc. Plan KBE -- 50.7' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool~~-'~ P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028321 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 1432' NSL, 1119' EWL, SEC. 18, T11N, R15E, UM Prudhoe Bay Unit Number Number U-630610 At top of productive interval 8. Well .1¢L2-1 1 3429' NSL, 3612' WEL, SEC. 18, T11N, R15E, UM At total depth 9. App~ximate spud date Amount $200,000.00 3339' NSL, 2485' WEL, SEC. 18, T11N, R15E, UM 05/22/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028307, 2450'I L2-13, 57' at 798' MD 2560 10870' MD / 8635' TVDss 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 3900' MD Maximum Hole Angle 90'6° Maximum surface 2595 psig, At total depth (TVD) 8800' / 3450 psig 118. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" Insulated Cond. Weld 110' Surface Surface 110' 110' _60 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 47# L-80 BTC 3675' Surface Surface 3675' 3675' ~889 sx Cold Set, 281 sx Class 'G' 8-1/2" 7" 26# L-80 IBT-Mod 8611' Surface Surface 8611' 8145' !481 sx Class 'G' 6'" 4-1/2" 12.6# L-80 IBT-Mod 2429' 8450' 7998' 10879' 8635' 309 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented M D TVD Structural Conductor Surface Intermediate Production :-::<~ i!~ ~"~ ~'" !~' ;? Liner ~"':~'. ;" * ...... " Perforation depth: measured :,, true vertical 20. Attachments [] Rling Pee [] Pmper~y Plat [] BOP Sketch [] Diver~er Sketch [] Drilling Program [] Drilling Ruid P~ogram [] Tin~e~,s Depth Pict [] 8efraction Analysis [] Seabed ~epor~ [] 20 AAC 25.050 gequiremen~s Contact Engineer Name/Number: J. Allen SlCerritt, 564_5~/04 /I Preston Evans, 564-5540 Prepared By Name/Number: Terrie Hubble, 564-4628 - / / / / 21.1 hereby certify that the.fore'lng is~ru¢' ar~ correct to the best of my knowledge Signed '"' ! c) Tim A. Burns ~k/~ ~/~ Title Senior Drilling Engineer Date O"'// ~' Commission Use Only Permit Number APl Number Approval Date I See cover letter ~:'~ - ~' 50- O ~_ ~'--- ~ ~, ~' ~',,~- ~,.~""~/,~,z/~_ ~ ~), for other requirements Conditions of Approval: Samples Required []Yes ~'No Mud Log Required ~.Yes []No Hydrogen Sulfide Measures :~]Yes [] No Directional Survey Required~Yes ~ No Required Working Pressure for BOPE [] 2M; []3M; '~5M; [] 10M; [] 15M Other: dng~nat 5~gn~a ~By by order of Approved By I:)~vid W. Johnston Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate 05/11/98 13:40 FAX 907 564 5193 BP EXPLORATION ~ AOGCC ~003 _ hare, d _' ery[ces To: Blair Wondzell From: Preston Fvans Date: 5-11-98 Well: L2-11 Re: Hazard Section of Permit to Drill, Cement Plan Blair, Attached is the addendum to the Permit to Ddll submitted ,5-1-98, Hazards section. Also attached is the cement plan for the surface casing where we do plan on using a Type H ES cement tool below the permafrost to ensure an adequate cement job, Thank you for your time, . Sincerely, Preston Evans ODE, Doyon 9 05/11/98 13'40 FAX 907 564 5193 BP EXPLORATION ~ AOGCC ~oo4 Addendum to L2-11 Permit to Drill, Addendum submitted 5-11-98 HAZARDS Cretaceous overpressure expected from LPC-02 water injection. Pore pressure predicted from 9.6-9.7 ppg EMW. Mud weight will be at least 9.8 ppg before entedng these zones. Put River also expected to overpressured with a pore pressure of 10.1 ppg EMW. Mud weight will be 10.4 ppg prior to ddlling into this interval. With higher mud weights, awareness of differential sticking needs to be heightened. Pad is a known H2S pad. Possible shallow gas exists in the W, Sak sands (6416' MD), Seabee shales (7813' MD) and the Put River formation (8507' MD) No significant faults are expected to be encountered by the well bore. However, the production zones accessed by DS-18 are known to be highly faulted and severe cases of loss circulation have been experienced. 05/11/98 13'40 FAX 907 564 5193 BP EXPLORATION ~ AOGCC ~005 HAL Li-B [,)RTO N HA L L IBURTON ENERGY SER VICES 0900 Arctic l~oulev~rd / Anchor.~ge, Alaska 99516 / Tel: 907-344-2929 / Fax' 907-344-6746 To: Allen Sherritt From: Larry Wilger Date: April 27, 1998 Re: DS L2-11 Cementing Surface Casing Cemenfi..n.g Design Assumptions I, Bottom holeeireulating_~_emperature is +/- SOO F. : 2. The hole will be washed out to 900% excess over gauge hole through the base. of the Permafrost ~ TI- 2,000' MD. 3. The excess factor below the permafrost is 30% over gauge hole. ~//~. Two-stage operation will be utilized to ensure compliance with State of Alas~l~ re ulations The two-stage collar will be placed in the casing string ~ ~0~~ g ' I ' 5. 750' Mil of tail cement is required for structaral and pressure integrity. Cement and _Spacer Design S~ p~lc~ 75 bbls. of fresh water prior to the cement on each stage. First Stage l~ad Cement Permafrost Type E Cement Approx. Volume 155sx Density 12.0 ppg Yield 2.17 cult/sack Water 11.63 gal/sack Thickening Time 4 hrs.+~50°F 05/11/98 13'40 FAX 907 564 5193 BP EXPLORATION ~ AOGCC ~006 SURFACE CASING, cont. Tail Cement Premium Cement + 2:% Calcium Chloride Second Stage Approx. Volume 295sx Density 15.8 ppg. Yield 1.15 cuff/sack Water 5.0 gal/saCk Thickening Time 4 hrs. + ® 50 o F ,~..,. . Permafrost Type E Cement Approx. Volume 3000sx Density 12.0 ppg Yield 2.17 cuff/sack Water 11.63 gal/sack Thickening Time 4 hrs. + ~ 50 0 F Cement Volumes First Stage Tail Cement 750' open hole +30% Excess + 80' Shoe Joint Lead Cement ~asl~ OiJ & Gas Co~s. Comr~ Open hole volume from 750' above the shoe to the stage collar + 30% Excess Second Stage Open hole volume from the stage collar to surface + 900% Excess capacity from surface to the stage collar. I Well Name: IL2-11 Well Summary I Type of Well: I Horizontal Producer I Surface Location: Target Location: BHL: X=692,817.16 Y=5,963,328.55 1432' FSL, 1119' FWL, S18, TllN, R15E, UM X=692,970 Y=5,965,330 3429' FSL, 3612' FEL, SEC. 18, T11 N, R15E X=694,100 Y=5,965,270 3339' FSL, 2485' FEL, SEC. 18, T11 N, R15E ]AFENumber: ]4J0351,0 I I Estimated StartDate: 15/22/98 I [MD: [ 10,870' ling: I Doyon 9 I Operating days to complete: 125.6 TVI): 18635' ss I I~ ~ev. Well Design: I Horizontal Well Objective: L2-11 is planned as a Zone lB producer, horizontal well targeting a DS 18 BHL. This grassroots well will consist of drilling a 12 ~A" surface hole with 9 5/8" casing. The intermediate hole will be 8 ½" with 7" intermediate casing. The production interval will be 6" to TD. This well will be completed with a 4-1/2" L-80 solid ce- mented liner and 4-1/2" L-80 tubing. The proposed horizontal well will improve the drainage pattern and maximise standoff from the GOC. The installation of MLAS's may be requested for future coil tubing sidetracks. Formation Markers Formation Tops Base Permafrost MD TVD (ss) 1913' 1911' BSAD SV5 3423' 3370' SV3 / T5 3733' 3680' SV1 / T3 4337' 4260' UG4 / K15-C1 5019' 4880' WS 2 6416 6150' WS1 / W. Sak 6603 6320 CM3 / K12 6801' 6500 K 10 7296' 6950 K 5 7813' 7420 K 2 8303' 7865 Put River 8507' 8050 LCU / Kingak 8545' 8085 Sag River 8606' 8140 Shublik 8650' 8180 TSAD 8715' 8240 Zone 3 8837' 8350 Zone 2 8895' 8400 Zone 1 /Romeo 9133' 8570 8650 Casing/Tubing Program Hole Size Tubular Wt/Ft Grade Conn Length' Top Btm O.D. MDrFVD MDFrVD 30" 20" Ins. Cond. Weld 110' Surface 110'/110' 12-1/4" 9-5/8" 47# L-80 BTC 3675' Surface 3675'/3675' 8-1/2" 7" 26# L-80 IBT-MOD 8611' Surface 8611'/8145' 6" 4-1/2" 12.6# L-80 IBT-MO D 2429' 8450/7998' 10879'/8635' Production Tubin9 NA I 4-1/2" 12..6# L-80 I BT- MO D 4214' Surface 8450'/7998' Open Hole Logs: 12-1/4" Hole Logging Program MWD Directional only 8-1/2" Hole MWD Dir/GR 6" Hole MWD Dir/GR/RES DPC logs(Platform Express) @ horizontal Directional I KOP: 13900' MD Maximum Hole Angle: Rig Move Close Approaches: Drilling Close Approaches: 90.6° None No Shut-ins required. L2-03 2502'MD 217' separation L2-06 3801'MD 151' L2-08 2109'MD 140' L2-10 2808'MD 118' L2-13 798'MD 57' L2-13 2901'MD 102' L2-14 4219'MD 136' L2-16 2408'MD 223' L2-18 ll07'MD 271' L2-20 2501'MD 319' L2-21 2600'MD 338' L2-24 4689'MD 256' L2-29 5116'MD 195' Cement Calculations Lead Cement Tail Cement Casing/Liner Sk / Wt / Yield Sk / Wt / Yield Comments Cold Set Lead to surface (900% excess through perma- 9-5/8" 2889 / 12.0 / 2.17 281 / 15.8 / 1.15 frost, 30% excess to TD); Class G Tail; Pump time=4+ hr.; TOC = Surface CI G; Tail FW=0; 7" N/A 481 / 15.8 / 1.15 30% excess; Pump time=4+ hr.; TOC = __.5039' MD Solid Cemented Liner, Class "G", TOC to 200' above 4-1/2" 309/15.8/1.15 liner top @ 8450'MD 50% excess open hole. Volume assumptions: Gauge hole + designated excess; 80' shoe joints; TOC as designated. Mud Program Surface (12-1/4" hole) Section: Spud Mud I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Initial 8.6 - 9.6 ___300 to 200 50-70 20-30 30-40 9-10 NC Hazards/Concerns Gravel beds, bridging, lost circulation. Frequent sweeps to aid hole cleaning. Intermediate (8-1/2" hole) Section: LSND I Density, ppg Funnel Vis, sec LSR YP Gels pH HPHT FL, cc 9.0 - 9.8 40 - 55 3 - 6 4 - 10/15 - 25 8.5 - 9.5 <18cc 9.8 - 10.4 40 - 60 3 - 6 4 - 10/15 - 25 8.5 - 9.0 <10cc Hazards/Concerns I Potential high torque could require lubricant use. I Be alert for lost circulation, differential sticking due to higher MW. Intermediate (6" hole) Section' 4% QUICKDRILn Density, pp~ I FunnelVis, secI LSRYP 8.6 - 8.8 50 -65 12 - 25 LSRV I pH HPHT FL, cc 35000-55000 8.5 - 9.0 NC Well Control Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular pre- venter will be installed and will be capable of handling maximum potential surface pressures. Will drill with extra mud weight for the Cretaceous interval (9.8 ppg) and the Put River (10.4 PPg.) Bottom hole pressure is expected to be 3450 psi @ 8800' tvdss. Maximum expected surface pressure at 8800' tvdss is 2595 psi (assuming gas column of 0.1 psi/fi) Diverter, BOPE and mud fluid system schematics on file with AOGCC. .Operations Summary Drillin~ Ri~ Procedure -- -- 1. The rig will MIRU. 2_ NU and function test diverter. 3_ Drill 12 ¼" hole to __.3,675' MD (_+3,675' TVD) per directional plan. Hold diverter drill while drilling surface hole. 4_ Run and cement 9-5/8", 47 #/ft, L-80 casing to TD. Ensure that cement reaches surface. 5_ Test 9-5/8" casing to 3,000 psi for 30 minutes. NU BOP. Test BOP. 6_ Drill shoe joint and 20' of new formation. Perform and record LOT. 7_ Drill 8 Y2" hole directionally to _+8,611' MD (8,196' TVD). 8_ Run and cement 7" casing to TD. TOC @ 5,039'MD (4,931' TVD) to cover Ugnu 4. 9_ Test 7" casing to 3000 psi for 30 minutes. 10. Displace to 4% KCI Quikdriln mud. 11. PU build section BHA w/MWD/GR/RES drill build & turn to horizontal -9,372' MD. 12. RIH w/DPC logs (Platform Express), log from horizontal to 7" shoe. 13. PU BHA for horizontal section w/MWD/GR/RES and drill to TD -10,879'MD. 14. Run 4-1/2" L-80 liner and set 7"x 4 ¼" hanger/packer TOL @ -8,450' MD with 1-2 MLAS (Place as per direction). 2 X nipples. 15. Cement via inner string. Place T©C ~200' above 4-1/2" Liner Top @ ~8,450'MD. Perf as per asset direction. 16. Complete with 3 GLMs, an X nipple and a SSSV on 4-1/2" tubing and set w/7"x4-1/2" packer @ ~8,350' MD. !'7. Freeze protect well. RDMO L2'11 PROPOSED COMPLETION DESIGN 9-5/8" 47# L~ : 80 BTC 3,675' MD ! : .4-1/2" L-80, 12.6#, IBT-MOD Tubing 2200' SSSV Landing Nipple Gas Lift Mandrels set @; 3500', 6100', 7913' TVD 3502', 6305', 8299' MD Wellhead 4 1/2" Completion: 4" Tubing Hanger 4" FMC Gen IV 7", 26# L-80 Liner 8,611' MD 7"x 4 1/2" Production packer @ + 8,350' MD "X" nipple only completion (future CT sidetrack) Top of 4-1/2" L-80, 12.6#, IBT-MOD Liner @ + 8,450' MD and one 50' below TSAD Sohd ceme ted her to TD @ 10,879 MD Date Revised by _ Comments 4/21/98 JAS PRUDHOE BAY UNIT _ WELL: L2-11 APl #: 50-029- -00 Shared Services Drilling Well · L2-11 Wp4 DrillQuest'" Proposal Data for L2-11 WP4 Verlr. al Origin: Well Hori:,ontal Origin: Well MoasurernenlUnlts: l1 Norlh Reference: T;ue Nodh Dogleg severity: Degrees per 100fl Vertical Seclion Azimuth: 34.928° Vedk:al Seclion De~criplion: Well Verlical Section Odgln: 0.00 N,0.00 E Measured Incl. Azlm. Vertical Northlnge Depth Depth ..... 0 oo o.(xx) 1.471 o.(x) o.oo 5tx).(x) 0 000 1.471 500.00 0.00 9(x).(x) 4(x)o I I o.o(xI899.68 4.77 150~) oo 4.(xx) I I0.000 1498.21 19.0~ 1900 (10 o.olx) 1.471 1897.1t9 23.86 /,800.(x) 0.000 1.471 379? .89 ...3.86 4210.69 24.642 340.616 4196.1M 58.17 8605.51t 24 642 340.616 8190.'/0 1786.71 8650.58 24 642 )40.616 8231.60 1804.40 81t36.21 29.04.1 .t9.617 840~.00 1876.86 8895.88 31.000 47.000 8451.69 1898.51 9171.86 88806 89.657 8687.89 19~4.62 9746.89 88.806 89.657 8695.'/0 1996.87 9813.10 90.558 94.656 8696.07 19~4.38 10878.61 90.558 94.656 8685.70 1907.88 Eastlngs Vertical Dogleg Section Rate 0.00 E 0.00 E 0.00 13.12E 3.59 1.000 52.45 E 14.38 0.000 65.56 E 17.97 1 65.56 E 17.97 0.000 36.70 E 68.70 6.000 571.49 W 1137.72 0.0130 577.72 W 1148.66 0.000 561.55 W 1217.33 14.000 541.07W 1246.80 7.000 170.78 W 1537,60 14.000 21M.16 E 1754.10 0.000 270.30 E 1789.93 8.000 1332.25 E 2327.00 0.000 PROPOSAL TARGET SUMMARY Target Name: TVDSS TVDRKB: Walthead Otlsets: Glc~ai Co.ordinales :! L2-11 Sag Int Pt 8140.00 8190.70t 786.71 N, 571.49 W 5965100.00 N. 692200.00 1.2-11 T1 8645.00 8695.701996.87 N. 204.t6 E 5965330.00 N, 692970.00 L2-11 T2 8635.00 8685.701907.88 N, 1332.25 E 5965270.00 N. 694100.00 SURFACE LOCATION PLOT DATE: 28-APR-98 RKB Elevation: 38.00 fl Rig (EST) ] 12.701t Well (CBE), 50.70 fl RKS- AMS~ Checked By: -~'~-,~'_~.~''~-'~'_ ,__. Coordinate System: NAD27 Alaska State Planes, Zooe 4, US Fool 4?0 2000 -- 1600 -- 1~200 -- O 800 - 400 - 8100: 8688.47 £2- l l ~ lnl Pl 8190.701}/~ 1780.71 ff. ~71.40 Fl 7" Casing 8611.08 MD 8195.70 TVD 5600.0~ L2- I I 1'1 8~9& 70 TI/O t998.$T tV. 204.16 E 4 1/2" Liner 10878.61 MD 8685.70 TVD~ L2-11 L2'- I1T~ 8fl$~. 70 TYD 1907.$$lV. 1332.25£ - 2000 - 1600 -- 1200 -- 8OO - 4OO I -400 Scale: linch = 40Oft I 40O Eastings 800 I 1200 Reference is True North fff~TC~--I-Iq-C~ Si~VlCGS Shared Services Drilling Well: L2-11 Wp4 I DrillQuestTM lOOO 2000 3000 ~000 0 5OOO II ~00.00 1100,00 700.00 !300.00 9 5/8' Casing 3677.81 MD 3675.70 TVD 1600.00 Vertical Origin: Well Horizontal Origin:Well MoasurementUnits: ft North Reference: True North Dogleg severity: Degrees per 100It Vertical Section Azimuth: 34,926° Vertical Section DescriptionWell Vertical Section Origin: 0.00 N,0.00 E Measured Incl. Azlm. Vertical Northlngs Eastlngs Vertical Dogleg Depth Depth Section Rate 0.00 0.000 1.471 0.00 0.00 N 0.00 E 0.00 500.00 0.000 1.471 500.00 0.00 N 0.00 E 0.(X) 0.L~J 900.00 4.000 110.000 899.68 4.77 S 13.12 E 3.59 1500.00 4.000 110.000 1498.21 19.09 S 52.45 E 14.38 0.000 1900.00 0.000 1.471 1897.89 23.86 S 65.56 E 17.97 1.0130 3800.00 0.000 1.471 3797.89 23.86 S 65.56 E 17.97 o.ocJo 4210.69 24.642 340.616 4196.04 58.17 N 36.70 E 68.70 6.00.) 8605.58 24.642 340.616 8190.70 1786.71 N 571.49 W 1137.72 0.000 8650.58 24.642 340.616 8231.60 1804.40 N 577.72 W 1148.66 0.0OO 8836.21 29.043 39.617 8400.00 1876.86 N 561.55 W 1217.33 14.000 8895.88 31.000 47.0(IO 8451.69 1898.51 N 541.07 W 1246.80 7.003 9371.86 88.806 89.657 8687.89 1994.62 N 170.78 W 1537.60 14.000 9746.89 88.806 89.657 8695.70 1~96.87 N 204.16 E 1754.10 0.000 9813.10 90.558 94.656 8696.07 1994.38 N 270.30 E 1789.93 8.000 10878.61 90.558 94.656 8685.70 1907.88 N 1332.25 E 2327.00 0.000 Base Permafrost: 1910.70 TVD PROPOSAL TARGET SUMMARY Target Name: *I'VDSSTVORKB: Wellhead Offsets: Global Coordnates L2-11 Sag Iht Pt 8140.008190.701786.71 N, 571.49 W 5965100.00 N. 692200.00 E I..2-11 T1 8645.008695.701996.87 N, 204.16 E 5965330.00 N, 692970.00 E 1_2-11 T2 8635.008685.701907.88 N, 1332.25 E5965270.00 N. 694100.00 E SV5: 3420.70 7'VD SV3: $730.70 TVD SURFACE LOCATION PLOT DATE: 28-APR-98 RKB Elevation: 38.00 il Rig (EST) 12.7011 WelI(CBE) I 50.70 ti RKB - AMSL I Checked By: . ='.~..~-~- "~ ~-- Coordinale Syslem: NAD27 Ataska State Planes, Zone 4, US Foot I SVI: 4510.70 7VD --UG4: 49.t0.70 TVD 1800.00 6O00 ).00 '000.00 WS2: 6200.70 '/'vi) WSI: 6570.70 TVD CM3/KI2: 6550.70 TVD 7000 K/O: 7000.70 TVD '600.00 KS: 7470. 70 TVD ~'6000 0 L~- l l &~ lnt PI 81~0.70 FYI} Scale: linch = lO00ft 7" Casing ,MD 8195.7O TVD -- K2: 7915.70 IVD Put River: 8100. 70 7'VD Kin~ok: 8136. 70~TVD -- Sag'River: 8190.70 T'VD Shublik: 8250.70 TVD TSAD: 8290.70 TVD -- TZ3:8400.70 TVD WP4 8620. 70 1'vD BXAD: 8700.70 TVD 8098. 70 rFO ooo mt~,.,z x. zo~.t a ~ 2000 L2-11 I2 8083. 70 TYD 1007.881V. 1332.2~ B Vertical Section 4 1/2' Liner 10878.61 MD 8685.70 TVD Section Azimuth: 34.926' (True North) Sperry Sun Drilling Serwices Proposal Report for L2-11 WP4 Prudhoe Bay Unit Alaska State Plane Zone 4 Lisburne DS 02 Measured Vertical Depth Incl. Azim, Depth Northings Eastings (ft) (ft) (ft) (ft) Vertical Dogleg Section Rate (ft) (°/100ft) 0,00 0,000 0,000 0.00 0.00 N 0.00 E 0.00 500.00 0.000 0,000 500.00 0.00 N 0.00 E 0.00 0.000 900.00 4,000 110,000 899.68 4.77 S 13.12 E 3.59 1.000 1500.00 4,000 110.000 1498.21 19.09 S 52.45 E 14.38 0.000 1900.00 0.000 0.000 1897.89 23,86 S 65.56 E 17.97 1.000 3800.00 0.000 0.000 3797.89 23.86 S 65.56 E 17.97 0.000 4210.69 24.642 340,616 4196.04 58.17 N 36.70 E 68.70 6.000 8605.58 24,642 340,616 8190.70 1786.71 N 571.49 W 1137.72 0.000 8650.58 24.642 340,616 8231,60 1804.40 N 577.72 W 1148.66 0.000 8836.21 29.043 39.617 8400.00 1876.86 N 561,55 W 1217.33 14.000 8895.88 31.000 47.000 8451.69 1898.51 N 541.07 W 1246.80 7.000 9371.86 88.806 89.657 8687.89 1994.62 N 170.78 W 1537.60 14.000 9746.89 88,806 89.657 8695.70 1996.87 N 204.16 E 1754.10 0.000 9813.10 90.558 94.656 8696,07 1994.38 N 270.30 E 1789.93 8.000 10878.61 90,558 94,656 8685.70 1907.88 N 1332.25 E 2327.00 0.000 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 34.926° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 10878.61ft., The Bottom Hole Displacement is 2327.00ft., in the Direction of 34.926° (True). Formation Tops Measured Vertical Sub-Sea Depth Depth Depth Northings Eastings Formation Name (ft) (ft) (ft) (ft) (ft) 1912.81 1910.70 1860.00 23.86 S 65.56 E Base Permafrost 3422.81 3420.70 3370,00 23.86 S 65.56 E SV5 3732,81 3730.70 3680.00 23.86 S 65.56 E SV3 4336.84 4310.70 4260.00 107.79 N 19.24 E SV1 5018.96 4930.70 4880.00 376.07 N 75.16 W UG4 6416.20 6200.70 6150.00 925.61 N 268.51 W WS2 6603.24 6370.70 6320.00 999.17 1'4 294.40 W WS1 6801.27 6550,70 6500.00 1077.06 N 321.80 W CM3/K12 7296.36 7000.70 6950.00 1271.78 N 390.31 W K10 7813.45 7470.70 7420.00 1475,15 N 461.87 W K5 8303,03 7915,70 7865.00 1667.71 N 529.62 W K2 8506.57 8100,70 8050,00 1747.76 N 557.79 W Put River 8545.07 8135.70 8085.00 1762.91 N 563.12 W Kingak 8605.58 8190,70 8140.00 1786.71 N 571.49 W Sag River 8649.59 8230.70 8180.00 1804.02 N 577.58 W Shublik 8715,14 8290,70 8240.00 1829.93 N 581.58 W TSAD 8837,01 8400,70 8350.00 1877.16 N 561.30 W TZ3 8894,73 8450,70 8400.00 1898.11 N 541.50 W TZ2 9133.31 8620,70 8570.00 1967,59 N 394.54 W TZ1 Casing details From To Measured Vertical Measured Vertical Depth Depth Depth Depth Casing Detail (ft) (ft) (ft) (ft) <Surface> <Surface> 3677.81 3675.70 9 5/8" Casing <Surface> <Surface> 8611.08 8195.70 7" Casing <Surface> <Sudace> 10878.61 8685.70 4 1/2" Liner Continued... 28 April, 1998- 15:45 - I - Dr#/Quest Sperry Sun Drilling SerVices Proposal Report for L2-11 WP4 Prudhoe Bay Unit Alaska State Plane Zone 4 Lisburne DS 02 Targets associated with this wellpath Target Name L2-11 Sag Iht Pt L2-11 T1 L2-11 T2 Target Entry Coordinates TVD Northings Eastings (ft) (ft) (fi) 8190.70 1786.71N 571.49W 8695.70 1996.87 N 204.16 E 8685.70 1907.88 N 1332.25 E Target Target Shape Type Point Geological Point Geological Point Geological 28 April, 1998 - 15:46 - 2 - DrillQuest Prudhoe Bay Unit Measured Depth (ft) Incl, 0.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00 900.00 1000.00 1100.00 1200.00 1300.00 1400.00 1500.00 1600.00 1700.00 1800.00 1900.00 1912.81 2000.00 2100.00 2200.00 2300.00 240O.OO 2500.00 2600.00 27O0.00 2800.00 0.000 0.000 0.000 0.000 0.000 0.000 1.000 2.000 3.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.000 2.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Azim, 0.000 0.000 0.000 0.000 0.000 0.000 110.000 110.000 110.000 110.000 110.000 110.000 110.000 110.000 110.000 110.000 110.000 110.000 110.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Sub-Sea Depth (ft) -50.70 49.30 149.30 249.30 349.30 449.30 549.29 649.26 749.16 848.98 948.73 1048.49 1148.24 1248.00 1347.76 1447.51 1547.33 1647.23 1747.19 1847.19 1860.00 1947.19 2047.19 2147.19 2247.19 2347.19 2447.19 2547.19 2647.19 2747.19 Sperry-Sun Drilling Services Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 0.00 0.00 N 0.00 100.00 0.00 N 0.00 200.00 0.00 N 0.00 300.00 0.00 N 0.00 400.00 0.00 N 0.00 500.00 0.00 N 0.00 599.99 0.30 S 0.82 699.96 1.19 S 3.28 799.86 2.69 S 7.38 899.68 4.77 S 13.12 999.43 7.16 S 19.67 1099.19 9.55 S 26.23 1198.94 11.93 S 32.78 1298.70 14.32 S 39.34 1398.46 16.70 S 45.89 1498.21 19.09 S 52.45 1598.03 21.18 S 58.18 1697.93 22.67 S 62.28 1797.89 23.56 S 64.74 1897.89 23.86 S 65.56 1910.70 23.86 S 65.56 1997.89 23.86 S 65.56 2097.89 23.86 S 65.56 2197.89 23.86 $ 65.56 2297.89 23.86 S 65.56 2397.89 23.86 S 65.56 2497.89 23.86 S 65.56 2597.89 23.86 S 65.56 2697.89 23.86 S 65.56 2797.89 23.86 S 65.56 Proposal Report for L2-11 WP4 Global Coordinates Dogleg Northings Eastings Rate (fi) (ft) (°/lOOff) 5963328.55 N 692817.16 E 5963328.55 N 692817.16 E 0.000 5963328.55 N 692817.16 E 0.000 5963328.55 N 692817.16 E 0.000 5963328.55 N 692817.16 E 0.000 5963328.55 N 692817.16 E 0.000 5963328.27 N 692817.99 E 1.000 5963327.44 N 692820.47 E 1.000 5963326.05 N 692824.61 E 1.000 5963324.11N 692830.39 E 1.000 5963321.90 N 692837.01 E 0.000 5963319.68 N 692843.62 E 0.000 5963317.46 N 692850.24 E 0.000 5963315.25 N 692856.85 E 0.000 5963313.03 N 692863.46 E 0.000 5963310.81N 692870.08 E 0.000 5963308.87 N 692875.87 E 1.000 5963307.49 N 692880.00 E 1.000 5963306.66 N 692882.48 E 1.000 5963306.38 N 692883.31E 1.000 5963306.38 N 692883.31 E 0.000 5963306.38 N 692883.31 E 0.000 5963306.38 N 692883.31 E 0.000 5963306.38 N 692883.31 E 0.000 5963306.38 N 692883.31E 0.000 5963306.38 N 692883.31 E 0.000 5963306.38 N 692883.31 E 0.000 5963306.38 N 692883.31 E 0.000 5963306.38 N 692883.31E 0.000 5963306.38 N 692883.31 E 0.000 Vertical Section (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.22 0.90 2.02 3.59 5.39 7.19 8.99 10.78 12.58 14.38 15.95 17.07 17.75 17.97 17.97 17.97 17.97 17.97 17.97 17.97 17.97 17.97 17.97 17.97 Comment Base Permafrost Alaska State Plane Zone 4 Lisburne DS 02 Continued... 28 April, 1998- 15:45 - I - DrillQuest Prudhoe Bay Unit Measured Depth (ft) 2900.00 3000.00 3100.00 3200.00 3300.00 3400.00 3422.81 3500.00 3600.00 3677.81 3700.00 3732.81 3800.00 3900.00 4000.00 4100.00 4200.00 4210.69 43O0.0O 4336.84 4400.00 4500.00 4600.0O 4700.00 4800.00 4900.00 5000.00 5018.96 5100.00 5200.00 Incl. 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.000 12.000 18.000 24.000 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 Azim. 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 Sub-Sea Depth (ft) 2847.19 2947.19 3047.19 3147.19 3247.19 3347.19 3370.00 3447.19 3547.19 3625.00 3647.19 3680.00 3747.19 3847.01 3945.73 4042.28 4135.59 4145.34 4226.51 4260.00 4317.41 4408.30 4499.19 4590.09 4680.98 4771.87 4862.77 4880.00 4953.66 5044.55 Sperry-Sun Drilling Services Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 2897.89 2997.89 3O97.89 3197.89 3297.89 3397.89 3420.70 3497.89 3597.89 3675.70 3697.89 3730.70 3797.89 3897.71 3996.43 4092.98 4186.29 4196.04 4277.21 4310.70 4368.11 4459.00 4549.89 4640.79 4731.68 4822.57 4913.47 4930.70 5004.36 5095.25 Proposal Report for L2-11 WP4 23.86 S 65.56 E 23.86 S 65.56 E 23.86 S 65.56 E 23.86 S 65.56 E 23.86 S 65.56 E 23.86 S 65.56 E 23.86 S 65.56 E 23.86 S 65.56 E 23.86 S 65.56 E 23.86 S 65.56 E 23.86 S 65.56 E 23.86 S 65.56 E 23.86 S 65.56 E 18.93 S 63.82 E 4.18 S 58.63 E 20.23 N 50.05 E 54.02 N 38.16 E 58.17 N 36.70 E 93.30 N 24.34 E 107.79 N 19.24 E 132.63 N 10.50 E 171.96 N 3.34W 211.29 N 17.18W 250.62 N 31.02W 289.95 N 44.85W 329.28 N 58.69W 368.61 N 72.53W '376.07 N 75.16W 407.94 N 86.37W 447.27 N 100.21W Global Coordinates Dogleg Northings Eastings Rate (ft) (fi) (°/100.) 5963306.38 N 692883.31E 0.000 5963306.38 N 692883.31E 0.000 5963306.38 N 692883.31E 0.000 5963306.38 N 692883.31 E 0.000 5963306.38 N 692883.31E 0.000 5963306.38 N 692883.31E 0.000 5963306.38 N 692883.31E 0.000 5963306.38 N 692883.31E 0.000 5963306.38 N 692883.31E 0.000 5963306.38 N 692883.31 E 0.000 5963306.38 N 692883.31E 0.000 5963306.38 N 692883.31 E 0.000 5963306.38 N 692883.31E 0.000 5963311.27 N 692881.45 E 6.000 5963325.88 N 692875.88 E 6.000 5963350.05 N 692866.67 E 6.000 5963383.53 N 692853.92 E 6.000 5963387.64 N 692852.35 E 6.000 5963422.44 N 692839.10 E 0.000 5963436.79 N 692833.63 E 0.000 5963461.40 N 692824.25 E 0.000 5963500.36 N 692809.41 E 0.000 5963539.33 N 692794.57 E 0.000 5963578.29 N 692779.72 E 0.000 5963617.25 N 692764.88 E 0.000 5963656.21 N 692750.04 E 0.000 5963695.18 N 692735.19 E 0.000 5963702.56 N 692732.38 E 0.000 5963734.14 N 692720.35 E 0.000 5963773.10 N 692705.51 E 0.000 Vertical Section (ft) 17.97 17.97 17.97 17.97 17.97 17.97 17.97 17.97 17.97 17.97 17.97 17.97 17.97 21.02 30.14 45.24 66.13 68.70 90.43 99.39 114.75 139.07 163.40 187.72 212.05 236.37 260.69 265.31 285.02 309.34 Comment SV5 9 5/8" Casing SV3 SV1 UG4 Alaska State Plane Zone 4 Lisburne DS 02 Continued... 28 Ap, ril, 1998 - 15:45 - 2 - DrillQuest Prudhoe Bay Unit Measured Depth (ft) 5300.00 5400.00 5500.00 5600.00 5700.00 5800.00 5900.00 6000.00 6100.00 6200.00 6300.00 6400.O0 6416.20 6500.00 6600.00 6603.24 6700.00 6800.00 6801.27 6900.00 7000.00 7100.00 7200.00 7296.36 7300.00 7400.00 7500.00 7600.00 7700.00 7800.00 Incl. 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 24.642 Azim. 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 340.616 Sub-Sea Depth (ft) 5135.45 5226.34 5317.23 5408.13 5499.02 5589.91 5680.81 5771.70 5862.59 5953.49 6044.38 6135.27 6150.00 6226.17 6317.06 6320.00 6407.95 6498.85 6500.00 6589.74 6680.63 6771.53 6862.42 6950.00 6953.31 7044.21 7135.10 7225.99 7316.89 7407.78 Vertical Depth (ft) 5186.15 5277.04 5367.93 5458.83 5549.72 5640.61 5731.51 5822.40 5913.29 6004.19 6095.08 6185.97 6200.70 6276.87 6367.76 6370.70 6458.65 6549.55 6550.70 6640.44 6731.33 6822.23 6913.12 7000.70 7004.01 7094.91 7185.80 7276.69 7367.59 7458.48 Sperry-Sun Drifting Services Proposal Report for L2-11 WP4 Local Coordinates Northings Eastings (ft) (ft) 486.60 N 114.05W 525.93 N 127.89W 565,26 N 141.72W 604.59 N 155.56W 643.92 N 169.40W 683.25 N 183.24W 722.58 N 197.08W 761.92 N 210.92W 801.25 N 224.75W 840.58 N 238.59W 879.91 N 252.43W 919.24 N 266.27W 925.61N 268.51W 958.57 N 280.11W 997.90 N 293.95W 999.17 N 294.40W 1037.23 N 307.79W 1076.56 N 321.62W 1077.06 N 321.80W 1115.89 N 335.46W 1155.22 N 349.30W 1194.55 N 363.14W 1233.88 N 376.98W 1271.78 N 390.31W 1273.21 N 390.82W 1312.54 N 404.66W 1351.87 N 418.49W '1391.20 N 432.33W 1430.54 N 446.17W 1469.87 N 460.01W :! Global Coordinates Dogleg Northings Eastings Rate (ft) (fi) (°/lOOff) 5963812.06 N 692690.66 E 0.000 5963851.03 N 692675.82 E 0.000 5963889.99 N 692660.97 E 0.000 5963928.95 N 692646.13 E 0.000 5963967.91N 692631.29 E 0.000 5964006.88 N 692616.44 E 0.000 5964045.84 N 692601.60 E 0.000 5964084.80 N 692586.76 E 0.000 5964123.76 N 692571.91 E 0.000 5964162.73 N 692557.07 E 0.000 5964201.69 N 692542.23 E 0.000 5964240.65 N 692527.38 E 0.000 5964246.96 N 692524.98 E 0.000 5964279.61 N 692512.54 E 0.000 5964318.58 N 692497.70 E 0.000 5964319.84 N 692497.22 E 0.000 5964357.54 N 692482.85 E 0.000 5964396.50 N 692468.01E 0.000 5964397.00 N 692467.82 E 0.000 5964435.46 N 692453.17 E 0.000 5964474.43 N 692438.32 E 0.000 5964513.39 N 692423.48 E 0.000 5964552.35 N 692408.64 E 0.000 5964589.89 N 692394.33 E 0.000 5964591.31 N 692393.79 E 0.000 5964630.28 N 692378.95 E 0.000 5964669.24 N 692364.11 E 0.000 5964708.20 N 692349.26 E 0.000 5964747.16 N 692334.42 E 0.000 5964786.13 N 692319.58 E 0.000 Vertical Section (ft) 333.67 357.99 382.31 406.64 430.96 455.29 479.61 503.93 528.26 552.58 576.91 601.23 605.17 625.56 649.88 650.67 674.20 698.53 698.84 722.85 747.18 771.50 795.82 819.26 820.15 844.47 868.80 893.12 917.44 941.77 Comment WS2 WS1 CM3/K12 K10 Alaska State Plane Zone 4 Lisburne DS 02 Continued... 28 April, 1998 - 15:45 - 3 - DrillQuest Sperry-Sun Drilling Services Proposal Report for L2-11 WP4 Prudhoe Bay Unit Alaska State Plane Zone 4 Lisburne DS 02 Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Local Coordinates Depth Northings Eastings (fi) (ft) (ft) 7813.45 24.642 340.616 7420.00 7470.70 1475.15 N 461.87 W 7900.00 24.642 340.616 7498.67 7549.37 1509.20 N 473.85 W 8000.00 24.642 340.616 7589.57 7640.27 1548.53 N 487.69 W 8100.00 24.642 340.616 7680.46 7731.16 1587.86 N 501.53 W 8200,00 24.642 340.616 7771.35 7822.05 1627.19 N 515.36 W 8300.00 24.642 340.616 7862.25 7912.95 1666.52 N 529.20 W 8303.03 24.642 340.616 7865.00 7915.70 1667.71 N 529.62 W 8400.00 24.642 340.616 7953.14 8003.84 1705,85 N 543.04 W 8500.00 24.642 340.616 8044.03 8094.73 1745.18 N 556.88 W 8506,57 24.642 340.616 8050.00 8100.70 1747.76 N 557.79 W 8545.07 24.642 340.616 8085.00 8135.70 1762.91 N 563.12 W 8600.00 24.642 340.616 8134.93 8185.63 1784.51 N 570.72 W 8605.58 24.642 340.616 8140.00 8190.70 1786.71 N 571.49 W 8611.08 24.642 340.616 8145.00 8195.70 1788.87 N 572.25 W 8649.59 24.642 340.616 8180.00 8230.70 1804.02 N 577.58 W 8650.58 24.642 340.616 8180.90 8231.60 1804.40 N 577.72 W 8700.00 23.358 357.386 8226.10 8276.80 1823.93 N 581.59 W 8715.14 23.341 2.736 8240.00 8290.70 1829.93 N 581.58 W 8800.00 26.407 30.292 8317.24 8367.94 1863.13 N 571.22 W 8836.21 29.043 39.617 8349.30 8400.00 1876.86 N 561.55 W 8837.01 29.066 39,721 8350.00 8400.70 1877.16 N 561.30 W 8894.73 30.959 46.866 8400.00 8450.70 1898.11 N 541.50 W 8895.88 31.000 47.000 8400.99 8451.69 1898.51 N 541.07 W 8900.00 31.392 47.817 8404.51 8455.21 1899.96 N 539.50 W 9000.00 42.089 63.086 8484.69 8535.39 1932.78 N 490.07 W 9100.00 54.091 72.837 8551.46 8602.16 1960.03 N 421.15 W 9133.31 58.237 75.408 8570.00 8620.70 1967.59 N 394.54 W 9200.00 66.669 79.939 8600.83 8651.53 1980.11 N 336.83 W 9300.00 79.510 85.784 8629.88 8680.58 1991.80 N 242.12 W 9371.86 88.806 89.657 8637.19 8687.89 1994.62 N 170.78 W Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°/lOOff) (ft) 5964791.36 N 692317.58 E 0.000 945.04 5964825.09 N 692304.73 E 0.000 966.09 5964864.05 N 692289.89 E 0.000 990.42 5964903.01N 692275.05 E 0.000 1014.74 5964941.97 N 692260.20 E 0.000 1039.06 5964980.94 N 692245.36 E 0.000 1063.39 5964982.12 N 692244.91 E 0.000 1064.12 5965019.90 N 692230.52 E 0.000 1087.71 5965058.86 N 692215.67 E 0.000 1112.04 5965061.42 N 692214.70 E 0.000 1113.63 5965076.42 N 692208.98 E 0.000 1123.00 5965097.82 N 692200.83 E 0.000 1136.36 5965100.00 N 692200.00 E 0.000 1137.72 5965102.14 N 692199.18 E 0.000 1139.06 5965117.15 N 692193.47 E 0.000 1148.42 5965117.53 N 692193.32 E 0.000 1148.66 5965136.96 N 692188.95 E 14.000 1162.46 5965142.95 N 692188.80 E 14.000 1167.38 5965176.41 N 692198.30 E 14.000 1200.53 5965190.38 N 692207.62 E 14.000 1217.33 5965190.69 N 692207.86 E 7.000 1217.71 5965212.13 N 692227.12 E 7.000 1246.22 5965212.55 N 692227.54 E 7.000 1246.80 5965214.03 N 692229.08 E 14.000 1248.89 5965248.11 N 692277.65 E 14.000 1304.10 5965277.13 N 692345.85 E 14.000 1365.90 5965285.36 N 692372.25 E 14.000 1387.33 5965299.36 N 692429.62 E 14.000 1430.63 5965313.48 N 692524.00 E 14.000 1494.44 5965318.13 N 692595.25 E 14.000 1537.60 Comment K5 K2 Put River Kingak Sa(3 River TaFget: L2-11 Sag Int Pt, Geological 7' Casing Shublik TSAD TZ3 TZ2 TZ1 Continued... 28 April, 1998 - 15:45 - 4 - DrillQuest Prudhoe Bay Unit Sperry-Sun Drilling Services Proposal Report for L2-11 WP4 Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) 9400.00 88.806 89.657 8637.77 8688.47 1994.79 N 142.65 W 9500.00 88.806 89.657 8639.86 8690.56 1995.39 N 42.67 W 9600.00 88.806 89.657 8641.94 8692.64 1995.99 N 57.31 E 9700.00 88.806 89.657 8644.02 8694.72 1996.59 N 157.28 E 9746.89 88.806 89.657 8645.00 8695.70 1996.87 N 204.16 E 9800.00 90.211 93.667 8645.46 8696.16 1995.33 N 257.24 E 9813.10 90.558 94.656 8645.37 8696.07 1994.38 N 270.30 E 9900.00 90.558 94.656 8644.52 8695.22 1987.32 N 356.91 E 10000.00 90.558 94.656 8643.55 8694.25 1979.21 N 456.57 E 10100.00 90.558 94.656 8642.58 8693.28 1971.09 N 556.24 E 10200.00 90.558 94.656 8641.60 8692.30 1962.97 N 655.91 E 10300.00 90.558 94.656 8640.63 8691.33 1954.85 N 755.57 E 10400.00 90.558 94.656 8639.66 8690.36 1946.74 N 855.24 E 10500.00 90.558 94.656 8638.68 8689.38 1938.62 N 954.90 E 10600.00 90.558 94.656 8637.71 8688.41 1930.50 N 1054.57 E 10700.00 90.558 94.656 8636.74 8687.44 1922.38 N 1154.23 E 10800.00 90.558 94.656 8635.76 8686.46 1914.27 N 1253.90 E .... 10878.61 90.558 94.656 8635.00 8685.70 1907.88 N 1332.25 E Global Coordinates Dogleg Northings Eastings Rate (ft) (ft) (°/100ft) 5965319.02 N 692623.36 E 0.000 5965322.19 N 692723.29 E 0.000 5965325.35 N 692823.22 E 0.000 5965328.52 N 692923.15 E 0.000 5965330.00 N 692970.00 E 0.000 5965329.82 N 693023.10 E 8.000 5965329.21N 693036.19 E 8.000 5965324.38 N 693122.95 E 0.000 5965318.82 N 693222.79 E 0.000 5965313.27 N 693322.63 E 0.000 5965307.71 N 693422.47 E 0.000 5965302.15 N 693522.31E 0.000 5965296.60 N 693622.15 E 0.000 5965291.04 N 693721.99 E 0.000 5965285.48 N 693821.83 E 0.000 5965279.93 N 693921.67 E 0.000 5965274.37 N 694021.51E 0.000 5965270.00 N 694100.00 E 0.000 Vertical Section (ft) 1553.84 1611.57 1669.30 1727.03 1754.10 1783.23 1789.93 1833.73 1884.13 1934.54 1984.94 2035.35 2085.75 2136.16 2186.56 2236.97 2287.37 2327.00 Comment Target: L2-11 T1, Geological 4 1/2' Liner Target: L2-11 T2, Geological All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 34.926° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 10878.61ft., The Bottom Hole Displacement is 2327.00ft., in the Direction of 34.926° (True). Alaska State Plane Zone 4 Lisburne DS 02 28 April, 1998 - 15:45 -5- DrillQuest Sperry-Sun Drilling Services Proposal Data - L2-11 - L2-11 WP4 7 MD (ft) 0.00 500.00 900.00 1500.00 1900.00 3800.00 :74210 ~ 69 · ':!:913:7.1 ~ 86 llO.O00i E:ast:ingS o.oo o.oo 819o.7o .71 N 571.49 w 0.000 1.000 0.000 . :1~ , ,: , 0.000 6.000 14.000 7.000 14.000 8695.70:! !1996.87 N 204.16 E![?!:i.' 8.000 8685.70 !::.::}ii~i~i~i[~!:i~:iTi 1907.88 N 1332.25 5631 Silverado Way #G Anchorage, Alaska 99518 (907) 563-3256 Fax (907) 563-7252 Shared Services Ddlling ...... ... Allen Sherdtt Approved Well Close Approach Review PBU / L2-11 Wp4 Allen, 'Ibc above mentioned well has been scanned using standard anti-collision methcxls via DEAP. 'lite scan was performed with the following parameters: Start Scan Inspection Zone End Scan h~spection Zone Starting Scan Radius Rate of Radius Increase (per 1000~ 38.00' 10,878.61 ' 200.00 ' 100.00' Anti-Collision Scan summary: At the planned KOP the Starting Scan Radius is 98.1' larger than DEAP's default settings of 100' Start Scan Radius increasing at 50' per 1000 'MD for a new-drill well scan, thus DE/iFs defaults would be equal to 101.9' at the Start Scan Inspection Zone as stated above. 'II~ese numbers are used to produce a final scan radius of 1284.061' which is 640.1305' larger than DEAP's default value of 643.9305' Scan Parameters Comments: At this enlarged radius the following wells were detected during the scan (Based on closest 'Allowable Deviation from Plan'): Note: this list may not include all the wells detected, only those of which are of concern or may effect Tolerance Line drawing! Comparison, Sublect Well Plalmed Well ]Relative pJlowab, le, We~l: De~th ~eratlon 4z, lmuth Deviation, ~ ('~WellPlanMD} (Point~oPoint} (TCDir~ction! OIm~rox-TLDbt} 216.79 186.00 ° 165.90 ' 1.2-03 2501.66 'MD 1.2-06 3800.87 'MD 150.67 L2-08 2108.75 'MD 139.72 1.2-10 2807.69 'MD 117.46 L2-13 798.38 'MD 57.67 L2-13 2901.24 'MD 102.46 L2-14 4219.39 'MD 136.02 1.2-16 2407.68 'MD 223.25 L2-18 1107.53 'MD 271.36 L2-20 2500.68 'MD 319.01 L2-21 2600.28 'MD 338.46 L2-24 4689.39 'MD 255.97 L2-29 5115.83 'MD 194,55 111.10 ° 47.22 100.10 o 95.50 77.60 ° 61.54 340.40 ° 41.52 306.30 o 43.79 72.20 o 62.05 23.90 ° 175.13 23.20 o 249.65 8.70 ° 268.55 336.50 o 286.35 49.90 ° 178.40 282.60 o 115.10 Shut-in Required? (Separation notes) Status aa Tested NO No No No No No No No No No No No No Maior Major Major Major Major Major Maior Major Major Major Major Major Major Tolerance Plot required: Yes Close Approach Comments: Close Approach Scan Performed by: Checked by: Approvcxl by: Date: Date: Date: Shared Services Approval: Date: L2-11 Wp4 AWD Proximity Review 4/29/98 Alaska hared ervices rilling WELL NAME DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET IThe attached work cannot commence without obtaining the required signatures in I the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. I "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet).~ DRILLING PERMIT Permit Documenm~on, Pz~pared: - ODE: ~~/~ Date: Permit~t~pJ'l'j~tion~7~i{wed: // Pe~t~ pplica¢. ~ n Sub~tted'. TA:,~~¢ ~~~ Date: ~q PRE-RIG WORK Pre-Rig Memo Reviewed: SDE/ES: Date: Pre-Rig Memo Sent to Slope: ODE: Date: Pre-Rig Sundry Documentation Prepared: ODE: Date: Pre-Rig Sundry Application Reviewed: SDE/ES: Date: Pre-Rig Sundry Application Submitted: TA: Date: SUNDRY NOTICE [2 Sundry Documentation Prepared: ODE: Date: r--]Sundry Application Reviewed: SDE/ES: Date: D Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK, USE PRE-RIG WORK SECTION AT BELOW LEFT Reason for Sundry (Check all that apply) Change to sumitted Drilling Permit Change to approved Drilling Permit Abandon Wellbore Workover of Injection Well Reenter Suspended Well Suspend Wellbore Change Well Type (Injector, Producer) Extending Expired Permit Other (Explain): APPROVAL TO PROCEED Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES' H13g083 DATE HANDL INVOICE / CREDIT MEMO CKO32498E [NG' TNST: S/H HE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVF DESCRIPTION TERRI HUBBL[ GROSS -.-..._=.___.~___. I00.00 X ~6~8 L O^TE ] [ OHEC,<NO. ] I 03/27/98J J 001360831 DISCOUNT NET .----____.___._. 1 OO. OO · WELL PERMIT CHECKLIST COMPANY WELL NAME ,~~~--//~ PROGRAM: exp [] dev~redrll [] serv [] wellbore segll ann. disposal para reqll FIELD & POOL ADMINISTRATION GEOL AREA ~"_~' ~ UNIT# ///~'~ ON/OFF SHORE REMARKS , 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. D ,TE 12. Permit fee attached ....................... N Lease number appropriate ................... N Unique well name and number .................. N Well located in a defined pool .................. N Well located proper distance from drilling unit boundary .... N Well located proper distance from other wells .......... N Sufficient acreage available in drilling unit ............ N If deviated, is wellbore plat included ............... N Operator only affected party ................... N Operator has appropriate bond in force ............. N Permit can be issued without conservation order ........ N Permit can be issued without administrative approval ...... N Can permit be approved before 15-day wait ........... N ENGINEERING 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CDT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit. 21. If a re-drill, has a 10-403 for abandonment been approved. 22. Adequate we,bore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ..... 26. BOPE press rating appropriate; test to ~~' ' ' I~sigl 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures ..... .Y. 31. Data presented on potential overpressure zones ....... 32. Seismic analysis of shallow gas zones ............ ./,/Y N 33. Seabed condition survey (if off-shore) .......... ~ Y N 34. Contact name/phone for weekly.progress repo. rts . . .,,¢/... Y N lexp~ora~ory on~y] GEO.: A:\GEN, Misc\FORMS\cheklist rev 09/97 dl[: C:\msoffico\wordiarl\dia~n\chr~f:klist ENGINEERING: COMMISSION: JDH ~ co Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history_ file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER COMPANY NAME : ARCO ALASKA, INC. WELL NAME : L2-11 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API N-UMBER : 500292288500 REFERENCE NO : 99091 REOEIVED iv!AR LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-MAR-1999 15:43 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 99/03/ 1 ORIGIN : FLIC REEL NAME : 99091 CONTINUATION # PREVIOUS REEL : COMMENT : ARCO ALASKA, PRUDHOE BAY, L2-11, API #50-029-22885-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 99/03/ 1 ORIGIN : FLIC TAPE NAME : 99091 CONTINUATION # : 1 PREVIOUS TAPE : CO~k4ENT : ARCO ALASKA, PRUDHOE BAY, L2-11, API #50-029-22885-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: L2-11 API NUMBER: 500292288500 OPERATOR: ARCO ALASKA, INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 1-MAR-99 JOB NUMBER: 99091 LOGGING ENGINEER: V LOMAX OPERATOR WITNESS: S RENNIE SURFACE LOCATION SECTION: 18 TOWNSHIP: 1 IN RANGE: 15E FNL: FSL: 1432 FEL: FWL: 1119 ELEVATION (FT FROM MSL 0 ) KELLY BUSHING: 50.10 DERRICK FLOOR: 47.40 GROUND LEVEL: 12.70 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 4. 500 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-MAR-1999 15:43 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: EQUIVALENT UNSHIFTEDDEPTH .......... BASELINE DEPTH $ REMARKS: THIS FILE CONTAINS THE LDWG FORMATTED DEPTH DETERMINATION DATA AQUIRED ON ARCOALASKA'S L2-11 WELL. THIS LOG IS THE PDC. IT OVERRIDES THE PREVIOUS OPEN HOLE PDC PER CAROLINA TORRES. $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION : O01CO1 DATE : 99/03/ 1 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE SU~E4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9346.0 3626.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH GRCH ....... REgULRKS: THIS FILE CONTAINS THE EDITED DATA. THE CURVES ARE CLIPPED AT FIRST AND LAST VALID READING. LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-MAR-1999 15:43 PAGE $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUIVfl3NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1197108 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CCL GAPI 1197108 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CCL V 1197108 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CCL LB 1197108 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 9346.000 GRCH. CCL -999.250 CCL.CCL -999.250 TENS.CCL 407.000 DEPT. 3626.000 GRCH. CCL 32.352 CCL.CCL 0.073 TENS.CCL 331.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-MAR-1999 15:43 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 99/03/ 1 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 99/03/ 1 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 2 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 9347.5 3623.0 GR LOG HEADER DATA DATE LOGGED: 02-DEC- 98 SOFTWARE VERSION: 8Cl-205 TIME LOGGER ON BOTTOM: 1632 02-DEC-98 TD DRILLER (FT) : 11485.0 TD LOGGER (FT) : 11485.0 TOP LOG INTERVAL (FT) : 3 62 6.0 BOTTOM LOG INTERVAL (FT) : 9322.0 LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAIVk4A RAY CCL COLLAR LOCATOR $ BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE (IN): TOOL NUMBER GR CCL LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-MAR-1999 15:43 PAGE: DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): FAR COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE (CPS): NEAR COUNT RATE HIGH SCALE (CPS): TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. JOB RUN OFF SCHLUMBERGER C~E. LOG RUN AS PRIMARY DEPTH - NO CORRECTION. TOLL ZEROED AT GROUND LEVEL. THIS FILE CONTAINS THE RAW DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 LIS Tape Verification Listing Schlumberger Alaska Computing Center PAGE: TYPE REPR CODE VALUE 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1197108 O0 000 O0 0 2 1 1 4 68 0000000000 GR PS1 GAPI 1197108 O0 000 O0 0 2 1 1 4 68 0000000000 CCL PS1 V 1197108 O0 000 O0 0 2 1 1 4 68 0000000000 TENS PS1 LB 1197108 O0 000 O0 0 2 1 1 4 68 0000000000 WTEP PS1 DEGC 1197108 O0 000 O0 0 2 1 1 4 68 0000000000 WPRE PS1 PSI 1197108 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 9347.500 GR.PS1 36.589 WTEP. PS1 77.429 WPRE. PS1 1448.196 DEPT. 3623.000 GR.PS1 31.062 WTEP. PSI 57.343 WPRE. PS1 920.777 CCL.PS1 -0.038 TENS.PSi 406.000 CCL.PS1 -999.250 TENS. PSI 338.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE : 99/03/ 1 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 1-MAR-1999 15:43 PAGE: **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 99/03/ 1 ORIGIN · FLIC TAPE NAME : 99091 CONTINUATION # : 1 PREVIOUS TAPE : COGENT : ARCO ALASKA, PRUDHOE BAY, L2-11, API #50-029-22885-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 99/03/ 1 ORIGIN · FLIC REEL NAME : 99091 CONTINUATION # : PREVIOUS REEL CO~E4ENT · ARCO ALASKA, PRUDHOE BAY, L2-11, API #50-029-22885-00 * ALASKA COMPUTING CENTER . ****************************** , ............................ ....... SCHLUMBERGER ....... , ............................ ****************************** COMPANY NAM~ : ARCO ALASKA, INC. WELL NAlViE : L2-11 FIELD NAlVlE : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292147700 REFERENCE NO : 98400 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 ~_ PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/08/ 5 ORIGIN · FLIC REEL NAME : 98400 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA INC, L2-ll, PRUDHOE BAY, API #50-029-21477-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/08/ 5 ORIGIN : FLIC TAPE NAME : 98400 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA INC, L2-11, PRUDHOE BAY, API #50-029-21477-00 TAPE HEADER PRUDHOE BAY OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION RUN 1 98400 V LOMAX J HOLMAN SECTION: TOWNSHIP: RANGE: FNL : FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD lST STRING 2ND STRING L2-11 500292147700 ARCO ALASKA, INC. SCHLU~iBERGER WELL SERVICES 5-AUG-98 RUN 2 RUN 3 .......... 18 llN 1SE 1432 1119 50.10 47.40 12.70 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 5.600 7.000 8623.0 LIS Tape Veri£ication Listing Schlumberger Alaska Computing Center 5-AUG-1998 11: ~.' 3RD STRING PRODUCTION STRING CONTAINED HEREIN IS THE LDWG FORMATTED OPEN HOLE AIT, CNT, AND SDN DATA AQUIRED ON ARCOALASKA'S L2-11 WELL. THIS IS THE PRIMARY DEPTH CONTROL LOG FOR THIS WELL. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLEMAIN PASS Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data. DEPTH INCRE~fENT: 0.5000 FILE SUF~4ARY LDWG TOOL CODE AIT CNT SDN $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (f4EASURED DEPTH) START DEPTH STOP DEPTH 9472.0 8618.0 9448.0 8618.0 9462.0 8618.0 BASELINE DEPTH $ MERGED DATA SOURCE LDWG TOOL CODE $ REM_ARKS: THIS FILE CONTAINS THE EDITED MAIN PASS OPEN HOLE DATA. THE COUNTS HAVE BEEN DECIMATED AND CLIPPED AT FIRST READING AND AT CASING. $ .......... EQUIVALENT UNSHIFTED DEPTH .......... A I T CNT S DN RUN NO. PASS NO. ............... MERGE TOP MERGE BASE LIS FORMAT DATA LIS Tape Ver~'~ication Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 :..~, PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 112 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 9 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFIB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000 GR AIT GAPI O0 000 O0 0 1 1 1 4 68 0000000000 SP AIT MV O0 000 O0 0 1 1 1 4 68 0000000000 TENS AIT LB O0 000 O0 0 1 1 1 4 68 0000000000 TEND AIT LB O0 000 O0 0 1 t 1 4 68 0000000000 MRES AIT OHM~ O0 000 O0 0 1 1 1 4 68 0000000000 MTEMAIT DEGF O0 000 O0 0 1 1 1 4 68 0000000000 DEV AIT DEG O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNT PU-S O0 000 O0 0 1 1 1 4 68 0000000000 TNPH CNT PU-S O0 000 O0 0 1 1 1 4 68 0000000000 CALI SDN IN O0 000 O0 0 1 1 1 4 68 0000000000 DRHO SDN G/C3 O0 000 O0 0 1 1 1 4 68 0000000000 PEF SDN BN/E O0 000 O0 0 1 1 1 4 68 0000000000 RHOB SDN G/C3 O0 000 O0 0 1 1 1 4 68 0000000000 MSFL SDN OH~4M O0 000 O0 0 1 1 1 4 68 0000000000 MINVSDN OHFff~ O0 000 O0 0 1 1 1 4 68 0000000000 14NOR SDN OHF~4 O0 000 O0 0 1 1 1 4 68 0000000000 AFiO AIT OHM~ O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verl~-~cat~on Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 :_.. PAGE: NAME SERV UNIT SERVICE API API API API FILE NUM~ AU3MB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUF~ SAMP ELEM CODE (HEX) AF20 AIT OPiM~f O0 000 O0 0 1 1 1 4 68 0000000000 AF30 AIT OH~M O0 000 O0 0 1 1 1 4 68 0000000000 AF60 AIT 0H~94 O0 000 O0 0 1 1 1 4 68 0000000000 AFgO AIT OH~ff4 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 9479.000 GR.AIT -999.250 SP.AIT -30.750 TENS.AIT 2558.000 TEND.AIT 334.022 MRES.AIT -999.250 MTEM. AIT -999.250 DEV. AIT -999.250 CNTC. CNT -999.250 CFTC. CNT -999.250 FCNT. CNT -999.250 NCNT. CNT -999.250 CRAT. CNT -999.250 NRAT. CNT -999.250 NPHI.CNT -999.250 TNPH. CNT -999.250 CALI.SDN -999.250 DRHO.SDN -999.250 PEF. SDN -999.250 RHOB.SDN -999.250 MSFL.SDN -999.250 MINV. SDN -999.250 MNOR.SDN -999.250 AFIO.AIT -999.250 AF20.AIT -999.250 AF30.AIT -999.250 AF60.AIT -999.250 AF90.AIT -999.250 DEPT. 8618.000 GR.AIT 123.195 SP.AIT 2.500 TENS.AIT 1732.000 TEND.AIT 907.403 MRES.AIT 0.183 MTEM. AIT 143.284 DEV. AIT 25.871 CNTC. CNT 1624.257 CFTC. CNT 527.792 FCNT. CNT 445.995 NCNT. CNT 1477.118 CRAT. CNT 3.105 NRAT. CNT 3.281 NPHI.CNT 36.839 TNPH. CNT 38.312 CALI.SDN 6.123 DRHO.SDN 0.168 PEF.SDN 6.509 RHOB.SDN 2.588 MSFL.SDN 2.275 MINV. SDN 0.611 I4NOR.SDN 0.808 AFiO.AIT 5.154 AF20.AIT 5.501 AF30.AIT 2.860 AF60.AIT 3.175 AF90.AIT 3.227 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .002 SERVICE ' FLIC VERSION · O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Ver~£~ication Listing Schlumberger Alaska Computing Center 5-AUG-1998 11: PAGE: FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCRI~4ENT: 0.5000 FILE S~Y LDWG TOOL CODE AIT CNT $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 8618.0 8500.0 8618.0 8500.0 BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... AIT CNT REM~ARKS: THIS FILE CONTAINS THE EDITED CASED HOLE DATA. COUNTS HAVE BEEN DECIMATED AND CLIPED AT CASING AND AT LAST READING. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 19 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verl~'ication Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 :.~ PAGE: ** SET TYPE - CHAN ** NAM~ SERV UNIT SERVICE API API API API FILE NUMB ND?4B SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000 TENS AIT LB O0 000 O0 0 2 1 1 4 68 0000000000 HTENAIT LB O0 000 O0 0 2 1 1 4 68 0000000000 DEV AIT DEG O0 000 O0 0 2 1 1 4 68 0000000000 GRCH AIT GAPI O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CArT CPS O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 RCFT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 RCNTCNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNT O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNT PU-S O0 000 O0 0 2 1 1 4 68 0000000000 TNPH CNT PU-S O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 8618.000 TENS.AIT 1732.000 HTEN. AIT 907.403 DEV. AIT GRCH.AIT 123.195 CNTC. CNT 1624.257 CFTC. CArT 527.792 RCFT. CNT RCNT. CNT 1477.118 CRAT. CNT 3.105 NRAT. CNT 3.281 NPHI.CNT TNPH. CNT 38.312 DEPT. 8500.000 TENS.AIT 1711.000 HTEN. AIT 882.806 DEV.AIT GRCH.AIT 202.858 CNTC. CNT 1491.941 CFTC. CNT 485.227 RCFT. CNT RCNT. CNT 1353.734 CRAT. CNT 3.184 NRAT. CNT 3.184 NPHI.CNT TNPH. CNT 38.270 25. 871 445. 995 36. 839 27. 252 372. 661 36. 896 ** END OF DATA ** **** FILE TRAILER **** FILE NAM~ : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Veri'll'cation Listing Schlumberger Alaska Computing Center 5-AUG-1998 11:_~ PAGE: **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 3 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SU~i~ARY VENDOR TOOL CODE START DEPTH AIT 8868.0 PEX 8868.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH .......... 8618.0 8618.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMFIA RAY CNL COMPENSATED NEUTRON AIT ARRAY INDUCTION PEX DENSITY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 04-JUN-98 8C1-205 2300 03-JUN-98 159 05-JUN-98 9509.0 9509.0 8500.0 9479.0 TOOL NUMBER HGR HCNT AIT-H HILT-DTB 5. 600 8623.0 8618.0 LIS Tape Ve~,f~ication Listing Schlumberger Alaska Computing Center 5-AUG-1998 11.~=~: PAGE: BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S) : 47.0 MUD PH: 8.9 FLUID LOSS (C3): 8.2 MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OH~4M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): O. 210 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: DOYON 9. DID NOT TAG BOTTOM TO AVOID DAMAGING LOGGING TOOLS. THIS FILE CONTAINS THE RAW OPEN HOLE MAIN PASS DATA AT O . 5 ' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 5 66 6 73 7 65 8 68 O. $ 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 ~ PAGE: TYPE REPR CODE VALUE 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUAiB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX) DEPT FT O0 000 O0 0 3 1 1 4 68 0000000000 GR AIT GAPI O0 000 O0 0 3 1 1 4 68 0000000000 SP AIT MV O0 000 O0 0 3 1 1 4 68 0000000000 TENS AIT LB O0 000 O0 0 3 1 1 4 68 0000000000 HTEN AIT LB O0 000 O0 0 3 1 1 4 68 0000000000 MRES AIT OHMI~I O0 000 O0 0 3 1 1 4 68 0000000000 MTEMAIT DEGF O0 000 O0 0 3 1 1 4 68 0000000000 GDEVAIT DEG O0 000 O0 0 3 1 1 4 68 0000000000 CNTC PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000 CFTC PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000 RCFT PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000 RCNT PEX CPS O0 000 O0 0 3 1 1 4 68 0000000000 TNRA PEX O0 000 O0 0 3 1 1 4 68 0000000000 RTNR PEX O0 000 O0 0 3 1 1 4 68 0000000000 TNPH PEX PU O0 000 O0 0 3 1 1 4 68 0000000000 NPHI PEX PU O0 000 O0 0 3 1 1 4 68 0000000000 NPOR PEX PU O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 8868.000 GR.AIT 23.973 SP.AIT -45.313 TENS.AIT HTEN. AIT 1010.763 f4RES.AIT 0.236 MTEM. AIT 150.301 GDEV. AIT CNTC.PEX 6485.579 CFTC. PEX 5493.181 RCFT.PEX 4259.683 RCNT. PEX TNRA.PEX 1.219 RTNR.PEX 1.287 TNPH. PEX 9.611 NPHI.PEX NPOR.PEX 9.145 DEPT. 8618.000 GR.AIT 123.195 SP.AIT 2.500 TENS.AIT HTEN. AIT 907.403 lVIRES.AIT 0.183 MTEM.AIT 143.284 GDEV. AIT CNTC. PEX 1624.257 CFTC. PEX 527.792 RCFT. PEX 445.995 RCNT. PEX TNRA.PEX 3.105 RTNR.PEX 3.281 TNPH. PEX 38.312 NPHI.PEX NPOR.PEX 36.839 1381.000 36.352 5832.892 10.047 1732.000 25.871 1477.118 39.456 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 PAGE: 10 **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUM~ER: PASS NUMBER: DEPTH INCREFiENT: FILE SUMmarY FILE HEADER FILE NUM~ER 4 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 1 0.2500 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 8868.0 8618.0 PEX 8868.0 8618.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... GR GAM~A RAY 04-JUN-98 8Cl-205 2300 03-JUN-98 159 05-JUN-98 9509.0 9509.0 8500.0 9479.0 TOOL NUMBER ........... HGR LIS Tape Veri~cation Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 :~r~ PAGE: 11 CNL AIT PEX $ COMPENSATED NEUTRON ARRAY INDUCTION DENSITY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): HCNT AIT-H HILT-DTB 5. 600 8623.0 8618. o BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S) : 47.0 MUD PH: 8.9 FLUID LOSS (C3): 8.2 MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OPff4M) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): O. 210 MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: DOYON 9. DID NOT TAG BOTTOM TO AVOID DAMAGING LOGGING TOOLS. THIS FILE CONTAINS THE RAW OPEN HOLE MAIN PASS DATA AT 0.25' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 LIS Tape Verffication Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 PAGE: 12 TYPE REPR CODE VALUE 4 66 1 5 66 6 73 7 65 8 68 0.25 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUmB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 4 1 1 4 68 0000000000 AFiO AIT OH~ O0 000 O0 0 4 1 1 4 68 0000000000 AF20 AIT OH~ O0 000 O0 0 4 1 1 4 68 0000000000 AF30 AIT OH~f O0 000 O0 0 4 1 1 4 68 0000000000 AF60 AIT OH~4~ O0 000 O0 0 4 1 1 4 68 0000000000 AFgO AIT OH~ O0 000 O0 0 4 1 1 4 68 0000000000 ATiO AIT 0H~414 O0 000 O0 0 4 1 1 4 68 0000000000 AT20 AIT OH~4~ O0 000 O0 0 4 1 1 4 68 0000000000 AT30 AIT OHM~ O0 000 O0 0 4 1 1 4 68 0000000000 AT60 AIT OH~4~ O0 000 O0 0 4 1 1 4 68 0000000000 AT90 AIT OP~4~ O0 000 O0 0 4 1 1 4 68 0000000000 AOIO AIT OH~ O0 000 O0 0 4 1 1 4 68 0000000000 A020 AIT OPE~M O0 000 O0 0 4 1 1 4 68 0000000000 A030 AIT OH~ O0 000 O0 0 4 1 1 4 68 0000000000 A060 AIT OH~ O0 000 O0 0 4 1 1 4 68 0000000000 A090 AIT OH~J~ O0 000 O0 0 4 1 1 4 68 0000000000 CALI AIT IN O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 8868. 000 AFIO.AIT 47. 353 AF20.AIT 54. 358 AF30.AIT AF60 .AIT 198. 982 AF90.AIT 285.164 ATiO .AIT 48. 315 AT20 .AIT AT30.AIT 65. 531 AT60 .AIT 148. 657 AT90.AIT 175. 895 AOIO.AIT A020 .AIT 56. 623 A030 .AIT 79.175 AO60.AIT 60. 311 A090 .AIT CALI. AIT 5.600 87.169 58.734 43.099 62.942 ** END OF DATA ** LIS Tape Ver~'~ication Listing Schlumberger Alaska Computing Center 5-AUG-1998 11:'~%~' PAGE: 13 **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMFIARY FILE HEADER FILE NUM~ER 5 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 1 0.1667 VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... AIT 8868.0 8618.0 PEX 8868.0 8618.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY 04-J[IN-98 8Cl-205 2300 03-JUN-98 159 05-JUN-98 9509.0 9509.0 8500.0 9479.0 TOOL NUMBER HGR LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 PAGE: 14 CNL AIT PEX $ COMPENSATED NEUTRON ARRAY INDUCTION DENSITY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): HCNT AIT-H HILT-DTB 5.600 8623.0 8618.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S) : 47.0 MUD PH: 8.9 FLUID LOSS (C3): 8.2 MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 0.210 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) '. THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: DOYON 9. DID NOT TAG BOTTOM TO AVOID DAMAGING LOGGING TOOLS. THIS FILE CONTAINS THE RAW OPEN HOLE MAIN PASS DATA AT O. 1667 ' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 :~=~ PAGE: 15 TYPE REPR CODE VALUE 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 14 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 5 1 1 4 68 0000000000 HDRA PEX G/C3 O0 000 O0 0 5 1 1 4 68 0000000000 PEFZ PEX O0 000 O0 0 5 1 1 4 68 0000000000 PEF8 PEX O0 000 O0 0 5 1 1 4 68 0000000000 RHOZ PEX G/C3 O0 000 O0 0 5 1 1 4 68 0000000000 RH08 PEX G/C3 O0 000 O0 0 5 1 1 4 68 0000000000 H~IN PEX OHFi~ O0 000 O0 0 5 1 1 4 68 0000000000 PiFiNO PEX OHFI~ O0 000 O0 0 5 1 1 4 68 0000000000 RXOZ PEX OHlV~I O0 000 O0 0 5 1 1 4 68 0000000000 RX08 PEX OPiMPI O0 000 O0 0 5 1 1 4 68 0000000000 HCNT PEX CPS O0 000 O0 0 5 1 1 4 68 0000000000 HCFT PEX CPS O0 000 O0 0 5 1 1 4 68 0000000000 HGR PEX GAPI O0 000 O0 0 5 1 1 4 68 0000000000 RHFT PEX CPS O0 000 O0 0 5 1 1 4 68 0000000000 RHNT PEX CPS O0 000 O0 0 5 1 1 4 68 0000000000 DPHZ PEX PU O0 000 O0 0 5 1 1 4 68 0000000000 HTNP PEX PU O0 000 O0 0 5 1 1 4 68 0000000000 HNPO PEX PU O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 8868.000 HDRA. PEX 0.023 PEFZ.PEX 2.088 PEF8.PEX RHOZ.PEX 2.437 RHO8.PEX 2.426 HMIN. PEX 1.502 HblNO. P~ RXOZ.PEX 8.713 RXO8.PEX 8.867 HCNT. PEX 6492.723 HCFT. PEX HGR.PEX 17.786 RHFT. PEX 4125.883 RI{NT.PEX 5874.877 DPHZ.PEX HTNP.PEX 9.653 HNPO. PEX 9.060 2.004 1.648 5486.084 12.925 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 PAGE: 16 **** FILE TRAILER **** FILE NAM~ : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE · FLIC VERSION · O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE AU3M~ER 6 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 1 0.0833 RUN NUMBER: TOOL STRING N73MBER: PASS NUMBER: DEPTH INCREMENT: FILE SUFk4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 8868.0 8618.0 PEX 8868.0 8618.0 $ LOG HEADER DATA DATE LOGGED: 04-JUN-98 SOFTWARE VERSION: 8C1-205 TIME CIRCULATION ENDED: 2300 03-JUN-98 TIME LOGGER ON BOTTOM: 159 05-JUN-98 TD DRILLER (FT): 9509.0 TD LOGGER(FT): 9509.0 TOP LOG INTERVAL (FT): 8500.0 BOTTOM LOG INTERVAL (FT): 9479.0 LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAF~A RAY TOOL NUFiBER ........... HGR LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 PAGE: 17 CNL AIT PEX $ COMPENSATED NEUTRON ARRAY INDUCTION DENSITY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): HCNT AIT-H HILT-DTB 5. 600 8623.0 8618.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S) : 47.0 MUD PH: 8.9 FLUID LOSS (C3): 8.2 MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OH~) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): 0.210 MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: DOYON 9. DID NOT TAG BOTTOM TO AVOID DAMAGING LOGGING TOOLS. THIS FILE CONTAINS THE RAW OPEN HOLE MAIN PASS DATA AT O. 0883 ' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 LIS Tape Verikication Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 PAGE: 18 TYPE REPR CODE VALUE 4 66 1 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 6 1 1 4 68 0000000000 HCAL PEX IN O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 8868.000 HCAL. PEX 5.642 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 :'i~ PAGE: 19 **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCRE~_~T: FILE SUMFIARY FILE HEADER FILE N-OMBER 7 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. 1 1 2 0.5000 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 8868.0 8618.0 PEX 8868.0 8618.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... GR CNL AIT PEX $ GAM~A RAY COMPENSATED NEUTRON ARRAY INDUCTION DENSITY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (?T) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS MUD TYPE: 04-JUN-98 8Cl-205 2300 03-JUN-98 159 05-JUN-98 9509.0 9509.0 8500.0 9479.0 TOOL NUMBER HGR HCNT AIT-H HILT-DTB 5. 600 8623.0 8618.0 LSND LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11:1%J.' PAGE: 2O MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S) : 47.0 MUD PH: 8.9 FLUID LOSS (C3): 8.3 MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): 0.210 MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERk4AL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: DOYON 9. DID NOT TAG BOTTOM TO AVOID DAMAGING LOGGING TOOLS. THIS FILE CONTAINS THE RAW OPEN HOLE REPEAT PASS DATA AT 0.5' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 $ 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center S-AUG-1998 11 :i~-' PAGE: 21 TYPE REPR CODE VALUE 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUPI~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX) DEPT FT O0 000 O0 0 7 1 1 4 68 0000000000 SP AIT MV O0 000 O0 0 7 1 1 4 68 0000000000 GR AIT GAPI O0 000 O0 0 7 1 1 4 68 0000000000 TENS AIT LB O0 000 O0 0 7 1 1 4 68 0000000000 HTENAIT LB O0 000 O0 0 7 1 1 4 68 0000000000 FIRES AIT OH~ O0 000 O0 0 7 1 1 4 68 0000000000 MTE~AIT DEGF O0 000 O0 0 7 1 1 4 68 0000000000 DEVI AIT DEG O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000 RCNT PEX CPS O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PEX O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PEX O0 000 O0 0 7 1 1 4 68 0000000000 TNPH PEX PU O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PEX PU O0 000 O0 0 7 1 1 4 68 0000000000 NPOR PEX PU O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 8868.000 SP.AIT 0.000 GR.AIT 51.425 TENS.AIT HTEN. AIT 1007.967 FiRES.AIT 0.172 MTE~.AIT 144.924 DEVI.AIT CNTC. PEX 3707.098 CFTC.PEX 1394.851 RCFT. PEX 1137.538 RCNT. PEX TNRA.PEX 2.669 RTNR.PEX 2.878 TNPH.PEX 31.464 NPHI.PEX NPOR.PEX 31.116 1454.000 -999.250 3289.588 31.894 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION · O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 i1 PAGE: 22 **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER 8 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. 1 1 2 0.2500 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 8868.0 8618.0 PEX 8868.0 8618.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY CNL COMPENSATED NEUTRON AIT ARRAY INDUCTION PEX DENSITY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: 04-JUN-98 8Cl-205 2300 03-JUN-98 159 05-JUN-98 9509.0 9509.0 8500.0 9479.0 TOOL NUFiBER HGR HCNT AIT-H HILT-DTB 5. 600 8623.0 8618.0 LSND .. · LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG~1998 11 ~.i~-' PAGE: 23 MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S) : 47.0 MUD PH: 8.9 FLUID LOSS (C3): 8.3 MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OH~) AT TEMPERATURE (DEGF) : MUD AT M~ASURE2~ TEMPERATURE (MT): 0.210 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): REM3LgJfS: THANK YOU FOR USING SCHLUMBERGER. RIG: DOYON 9. DID NOT TAG BOTTOM TO AVOID DAMAGING LOGGING TOOLS. THIS FILE CONTAINS THE RAW OPEN HOLE REPEAT PASS DATA AT 0.25' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 5 66 6 73 7 65 8 68 0.25 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 PAGE: 24 TYPE REPR CODE VALUE 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUPIB SAMP ELE~ CODE (HEX) DEPT FT O0 000 O0 0 8 1 1 4 68 0000000000 AFIO AIT OH~ O0 000 O0 0 8 1 1 4 68 0000000000 AF20 AIT OH~4 O0 000 O0 0 8 1 1 4 68 0000000000 AF30 AIT OH~4 O0 000 O0 0 8 1 1 4 68 0000000000 AF60 AIT OH~4~ O0 000 O0 0 8 1 1 4 68 0000000000 AF90 AIT OHMM O0 000 O0 0 8 1 1 4 68 0000000000 ATiO AIT 0H~94 O0 000 O0 0 8 1 1 4 68 0000000000 AT20 AIT OH~4 O0 000 O0 0 8 1 1 4 68 0000000000 AT30 AIT OH~4~ O0 000 O0 0 8 1 1 4 68 0000000000 AT60 AIT OPk4~ O0 000 O0 0 8 1 1 4 68 0000000000 AT90 AIT OHF~ O0 000 O0 0 8 1 1 4 68 0000000000 AOiO AIT 0H~94 O0 000 O0 0 8 1 1 4 68 0000000000 A020 AIT OH~4~ O0 000 O0 0 8 1 1 4 68 0000000000 A030 AIT OHF~q O0 000 O0 0 8 1 1 4 68 0000000000 A060 AIT OH~4~ O0 000 O0 0 8 1 1 4 68 0000000000 A090 AIT OH~4~ O0 000 O0 0 8 1 1 4 68 0000000000 CALI AIT IN O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** DEPT. 8868.000 AFiO.AIT 13.891 AF20.AIT 14.821 AF30.AIT AF60.AIT 1950.000 AF90.AIT 644.268 ATiO.AIT 6.321 AT20.AIT AT30.AIT 24.121 AT60.AIT 1950.000 AT90.AIT 207.965 AOiO.AIT AO20.AIT 10.193 AO30.AIT 22.628 AO60.AIT 1950.000 AO90.AIT CALI.AIT 5.497 88.904 10.190 6.323 481.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE · 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 PAGE: 25 **** FILE HEADER **** FILE NAM~ : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 9 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUFiBER: 1 PASS NUMBER: 2 DEPTH INCREMENT: 0. 1667 FILE SO?~4ARY VENDOR TOOL CODE START DEPTH AIT 8868.0 PEX 8868.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR CNL AIT PEX $ STOP DEPTH 8618.0 8618.0 04 -JUN-98 8Cl -205 2300 03-JUN-98 159 05-JUN-98 9509.0 9509.0 8500.0 9479.0 GAFk4A RAY COMPENSATED NEUTRON ARRAY INDUCTION DENSITY TOOL NUFIBER HGR HCNT AIT-H HILT-DTB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) .. LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: 5. 600 8623.0 8618.0 LSND LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 :i~ PAGE: 26 MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S) : 47.0 MUD PH: 8.9 FLUID LOSS (C3): 8.3 MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~k4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): O. 210 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: DOYON 9. DID NOT TAG BOTTOM TO AVOID DAMAGING LOGGING TOOLS. THIS FILE CONTAINS THE RAW OPEN HOLE REPEAT PASS DATA AT 0.1667' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 14 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11:1~7' PAGE: 27 TYPE REPR CODE VALUE 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE ND?4~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) ....................................................................................... DEPT FT O0 000 O0 0 9 1 1 4 68 0000000000 HDRA PEX G/C3 O0 000 O0 0 9 1 1 4 68 0000000000 PEFZ PEX O0 000 O0 0 9 1 1 4 68 0000000000 PEF8 PEX O0 000 O0 0 9 1 1 4 68 0000000000 RHOZ PEX G/C3 O0 000 O0 0 9 1 1 4 68 0000000000 RH08 PEX G/C3 O0 000 O0 0 9 1 1 4 68 0000000000 H~IN PEX OH~ O0 000 O0 0 9 1 1 4 68 0000000000 HFiNO PEX OHI~q O0 000 O0 0 9 1 1 4 68 0000000000 RXOZ PEX OH~M O0 000 O0 0 9 1 1 4 68 0000000000 RX08 PEX OH~M O0 000 O0 0 9 1 1 4 68 0000000000 HCNT PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000 HCFT PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000 HGR PEX GAPI O0 000 O0 0 9 1 1 4 68 0000000000 RHFT PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000 RHNT PEX CPS O0 000 O0 0 9 1 1 4 68 0000000000 DPHZ PEX PU O0 000 O0 0 9 1 1 4 68 0000000000 HTNP PEX PU O0 000 O0 0 9 1 1 4 68 0000000000 HNPO PEX PU O0 000 O0 0 9 1 1 4 68 0000000000 ** DATA ** DEPT. 8868.000 H~RA.PEX -999.250 PEFZ.PEX -999.250 PEF8.PEX RHOZ.PEX -999.250 RHO8.PEX -999.250 HMIN. PEX 6.044 H~NO.PEX RXOZ.PEX 7.410 RXO8.PEX 7.410 HCNT. PEX 3707.098 HCFT. PEX HGR.PEX 51.425 RHFT. PEX 1137.538 RHNT. PEX 3289.588 DPHZ.PEX HTNP. PEX 31.464 PfNPO.PEX 31.116 -999.250 4.504 1394.851 60721.211 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 :i~='~ PAGE: 28 **** FILE HEADER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMEAYP: FILE SUFk~tRY FILE HEADER FILE NUMBER 10 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. 1 1 2 0.0833 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 8868.0 8618.0 PEX 8868.0 8618.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR CNL AIT PEX $ GAMMA RAY COMPENSATED NEUTRON ARRAY INDUCTION DENSITY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: 04-JUN-98 8Cl-205 2300 03-JUN-98 159 05-JUN-98 9509.0 9509.0 8500.0 9479.0 TOOL NUFiBER HGR HCNT AIT-H HILT-DTB 5.600 8623.0 8618.0 LSND LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11:1-~~ PAGE: 29 MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S) : 47.0 MUD PH: 8.9 FLUID LOSS (C3): 8.3 MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) : MUD AT MEAS~ TEMPERATURE (MT): O. 210 MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAF~E AT (BHT): 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN) REMARKS: THANK YOU FOR USING SCHLUPIBERGER. RIG: DOYON 9. DID NOT TAG BOTTOM TO AVOID DAMAGING LOGGING TOOLS. THIS FILE CONTAINS THE RAW OPEN HOLE REPEAT PASS DATA AT 0.0833' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 :~'e- PAGE: 30 TYPE REPR CODE VALUE 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 10 1 1 4 68 0000000000 HCAL PEX IN O0 000 O0 0 10 1 1 4 68 0000000000 ** DATA ** DEPT. 8868.000 HCAL.PEX 5.497 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 11 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 1 DEPTH INC~: 0.5000 FILE SUMMARY LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 :~-~" PAGE: 31 VENDOR TOOL CODE START DEPTH AIT 8618.0 PEX 8618.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH .......... 8487.0 8487.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAlV~4A RAY CNL COMPENSATED NEUTRON AIT ARRAY INDUCTION P EX DENSITY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH : FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHN~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. 04-JUN-98 8Cl-205 2300 03-JUN-98 159 05-JUN-98 9509.0 9509.0 8500.0 9479.0 TOOL NON.ER HGR HCNT AIT-H HILT-DTB 5. 600 8623.0 8618.0 LSND 8.60 47.0 8.9 8.3 0.210 70.0 THERMAL SANDSTONE 2.65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 PAGE: 32 RIG: DOYON 9. DID NOT TAG BOTTOM TO AVOID DAMAGING LOGGING TOOLS. THIS FILE CONTAINS THE RAW CASED HOLE MAIN PASS DATA AT 0.5' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 60 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 17 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUPIB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 11 1 1 4 68 0000000000 TENS AIT LB O0 000 O0 0 11 1 1 4 68 0000000000 HTENAIT LB O0 000 O0 0 11 1 1 4 68 0000000000 MRES AIT OHFk~ O0 000 O0 0 11 1 1 4 68 0000000000 MTE~AIT DEGF O0 000 O0 0 11 1 1 4 68 0000000000 DEVI AIT DEG O0 000 O0 0 11 1 1 4 68 0000000000 GRCH AIT GAPI O0 000 O0 0 11 1 1 4 68 0000000000 CNTC PEX CPS O0 000 O0 0 11 1 1 4 68 0000000000 CFTC PEX CPS O0 000 O0 0 11 1 1 4 68 0000000000 RCFT PEX CPS O0 000 O0 0 11 1 1 4 68 0000000000 RCNT PEX CPS O0 000 O0 0 11 1 1 4 68 0000000000 CRAT PEX O0 000 O0 0 11 1 1 4 68 0000000000 NRAT PEX O0 000 O0 0 11 1 1 4 68 0000000000 NPHI PEX PU O0 000 O0 0 11 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 ll:i%- PAGE: 33 NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFiB SAMP ELE~ CODE (HEX) TNPH PEX PU O0 000 O0 0 11 1 1 4 68 0000000000 ** DATA ** DEPT. 8618.000 TENS.AIT 1732.000 HTEN. AIT 907.403 MRES.AIT MTEM.AIT 143.284 DEVI.AIT 25.871 GRCH.AIT 123.195 CNTC. PEX CFTC.PEX 527.792 RCFT. PEX 445.995 RCNT. PEX 1477.118 CRAT. PEX NRAT. PEX 3.281 NPHI.PEX 36.839 TNPH. PEX 38.312 DEPT. 8487.500 TENS.AIT 1566.000 HTEN.AIT 898.207 ~iRES.AIT MTE~.AIT 139.548 DEVI.AIT 27.364 GRCH.AIT 168.117 CNTC. PEX CFTC. PEX 475.012 RCFT. PEX 383.341 RCNT. PFJf 1247.651 CRAT. PEX NRAT. PEX 3.562 NPHI.PEX 42.674 TNPH. PEX 41.046 O. 183 1624. 257 3.105 0.174 1545.030 3.259 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUAfBER 12 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: 0.1667 FILE SUFm~Y LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11:1~" PAGE: 34 VENDOR TOOL CODE START DEPTH AIT PEX $ LOG HEADER DATA DATE LOGGED: 8618.0 8618.0 SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 8487.0 8487.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY CNL COMPENSATED NEUTRON AIT ARRAY INDUCTION PEX DENSITY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~I~) AT TEPIPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUFiBERGER. 04-JUN-98 8Cl-205 2300 03-JUN-98 159 05-JUN-98 9509.0 9509.0 8500.0 9479.0 TOOL NUMBER HGR HCNT AIT-H HILT-DTB 5. 600 8623.0 8618.0 LSND 8.60 47.0 8.9 8.3 0.210 70.0 THERMAL SANDSTONE 2.65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-i998 11: i~-" PAGE: 35 RIG: DOYON 9. DID NOT TAG BOTTOM TO AVOID DAMAGING LOGGING TOOLS. THIS FILE CONTAINS THE RAW CASED HOLE MAIN PASS DATA AT O. 1667 ' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUM~ ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 12 1 1 4 68 0000000000 HCNT PEX CPS O0 000 O0 0 12 1 1 4 68 0000000000 HCFT PEX CPS O0 000 O0 0 12 1 1 4 68 0000000000 HGR PEX GAPI O0 000 O0 0 12 1 1 4 68 0000000000 RHFT PEX CPS O0 000 O0 0 12 1 1 4 68 0000000000 RHNT PEX CPS O0 000 O0 0 12 1 1 4 68 0000000000 HTNP PEX PU O0 000 O0 0 12 1 1 4 68 0000000000 HNPO PEX PU O0 000 O0 0 12 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11 :i~~' PAGE: 36 DEPT. 8618.000 HCNT. PEX RH F T . P EX 416.624 PJ{NT . P EX DEPT. 8487. 834 HCNT. PEX RHFT. PEX 377. 758 ~. PEX 1626. 309 HCFT. PEX 1461. 525 HTlVP. PBX 1567. 260 HCFT. PBX 1188. 950 HTNP. PBX 526. 280 HGR. PEX 38. 511 I{NPO. PEX 495. 846 HGR. PEX 39. 611 HNPO . PBX 127.169 37. 552 162. 011 38. 666 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAI~E : EDIT .013 SERVICE : FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUM~ER 13 RAW CASED HOLE REPEAT PASSES Curves and log header data for each pass in separate files. PASS NUMBER: 2 DEPTH INCRE~J~T: 0.5000 FILE SUM~U~gY VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 8618.0 8488.0 PBX 8618.0 8488.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT): 04-JUN-98 8C1-205 2300 03-JUN-98 159 05-JUN-98 9509.0 9509.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11:~~ PAGE: 37 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY CNL COMPENSATED NEUTRON AIT ARRAY INDUCTION PEX DENSITY $ 8500.0 9479.0 TOOL NUMBER HGR HCl~f AIT-H HILT-DTB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 5. 600 8623.0 8618.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S) : 47.0 MUD PH: 8.9 FLUID LOSS (C3): 8.3 MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OH~9~) AT TEMPERATURE (DEGF): MUD AT f4EASURED TEMPERATURE (MT): 0.210 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: DOYON 9. DID NOT TAG BOTTOM TO AVOID DAMAGING LOGGING TOOLS. THIS FILE CONTAINS THE RAW REPEAT CASED HOLE DATA AT 0.5' SAMPLE RATE. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11:1~~' PAGE: 38 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 $ 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUFiB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 13 1 1 4 68 0000000000 TENS AIT LB O0 000 00 0 13 1 1 4 68 0000000000 CNTC PEX CPS O0 000 O0 0 13 1 1 4 68 0000000000 CFTC PEX CPS O0 000 O0 0 13 i 1 4 68 0000000000 TNRA PEX O0 000 O0 0 13 1 1 4 68 0000000000 GR AIT GAPI O0 000 O0 0 13 1 1 4 68 0000000000 RTNR PEX O0 000 O0 0 13 i 1 4 68 0000000000 RCFT PEX CPS O0 000 O0 0 13 1 1 4 68 0000000000 RCNT PEX CPS O0 000 O0 0 13 1 1 4 68 0000000000 DEVI AIT DEG O0 000 O0 0 13 1 1 4 68 0000000000 HTENAIT LB O0 000 O0 0 13 1 1 4 68 0000000000 MRES AIT OH~4 O0 000 O0 0 13 1 1 4 68 0000000000 MTE~AIT DEGF O0 000 O0 0 13 1 1 4 68 0000000000 NPHI PEX PU O0 000 O0 0 13 1 1 4 68 0000000000 TNPH PEX PU O0 000 O0 0 13 1 1 4 68 0000000000 NPOR PEX PU O0 000 O0 0 13 1 1 4 68 0000000000 SP AIT MV O0 000 O0 0 13 1 1 4 68 0000000000 ** DATA ** DEPT. 8618.000 TENS.AIT 1732.000 CNTC. PEX 1574.600 CFTC. PEX TNRA.PEX 3.570 GR.AIT 130.328 RTNR.PEX 3.413 RCFT. PEX RCNT. PEX 1331.317 DEVI.AIT 25.843 HTEN. AIT 931.296 AIRES.AIT MTEM. AIT 142.030 NPHI.PEX 47.457 TNPH. PEX 40.338 NPOR.PEX 487.259 366.940 0.156 42.190 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11:1~~ PAGE 39 SP. AIT 47. 313 DEPT. 8488. 000 TENS.AIT TNRA. PEX 4.187 GR. AIT RCNT. PEX 1262.927 DEVI.AIT MTE~.AIT 139.205 NPHI.PEX SP.AIT 36. 938 1067. 000 CNTC. PEX 245. 031 RTNR. PEX 27. 333 HTEN. AIT 58. 768 TNPH. PEX 1382.561 CFTC. PEX 3.776 RCFT. PEX 882.966 lqRES.AIT 48.712 NPOR.PEX 367.682 342.767 0.149 48.010 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .013 SERVICE · FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .014 SERVICE · FLIC VERSION : O01CO1 DATE : 98/08/ 5 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 14 RAW CASED HOLEREPEAT PASSES Curves and log header data for each pass in separate files. PASS NUMBER: 2 DEPTH INCRENiF2Fr: 0.1667 FILE SUAg~ARY VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 8618.0 8488.0 PEX 8618.0 8488.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : 04-JUN-98 8Cl-205 2300 03-JUN-98 159 05-JUN-98 9509.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 5-AUG-1998 11:1~-~ PAGE: 4O TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CNL COMPENSATED NEUTRON AIT ARRAY INDUCTION PEX DENSITY $ 9509.0 8500.0 9479.0 TOOL NUMBER HGR H CNT AIT-H HILT-DTB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 5. 600 8623.0 8618.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S) : 47.0 MUD PH: 8.9 FLUID LOSS (C3): 8.3 MAXIMUM RECORDED Ti~4PERATURE (DEGF) : RESISTIVITY (OHFIM) AT TEMPERATURE (DEGF): MUD AT FiEASURED TEMPERATURE (MT): 0.210 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : 70.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): REMARKS: THANK YOU FOR USING SCHLUMBERGER. RIG: DOYON 9. DID NOT TAG BOTTOM TO AVOID DAMAGING LOGGING TOOLS. THIS FILE CONTAINS THE RAW REPEAT CASED HOLE DATA AT O. 1667 · SAMPLE RATE. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Compu ting Center 5~AUG-1998 11 :~ PAGE: 41 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE ~ 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE ~ CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFiB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 14 1 1 4 68 0000000000 HCNT PEX CPS O0 000 O0 0 14 1 1 4 68 0000000000 HCFT PEX CPS O0 000 O0 0 14 1 1 4 68 0000000000 HGR PEX GAPI O0 000 O0 0 14 1 1 4 68 0000000000 RHFT PEX CPS O0 000 O0 0 14 1 1 4 68 0000000000 RHNT PEX CPS O0 000 O0 0 14 1 1 4 68 0000000000 HTNP PEX PU O0 000 O0 0 14 1 1 4 68 0000000000 HNPO PEX PU O0 000 O0 0 14 1 1 4 68 0000000000 ** DATA ** DEPT. 8618.000 HCNT.PEX 1574.000 HCFT. PEX 489.500 HGR.PEX 139.094 RHFT. PEX 373.250 RI{NT. PEX 1345.500 HTNP. PEX 40.088 HNPO. PEX 41.406 DEPT. 8488.334 HCNT.PEX 1365.641 HCFT. PEX 377.815 HGR.PEX 202.229 RHFT. PEX 328.879 Rt{NT. PEX 1191.211 HTNP.PEX 48.328 t{NPO.PEX 47.288 ** END OF DATA ** Sperry-Sun Drilling Services LIS Scan Utility Fri Sep 04 15:17:16 1998 Reel Header Service na~ ............. LISTPE Date ..................... 98/09/04 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/09/04 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: RECEIVED SEP 0 9 1990 Alaska Oil & Gas Cons. Commission, L2-11 PB1 500292288570 ~l~,uraye ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 04-SEP-98 MWD RUN 3 MWD RUN 4 MWD RUN 5 AK-MM-80238 AK-MM-80238 AK-MM-80238 R. MCNEILL J. FOLEY J. FOLEY P. SMITH P. SMITH J. HOLMAN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: MWD RUN 6 AK-MM-80238 J. FOLEY J. HOLMAN MWD RUN 7 AK-MM-80238 M. HANIK J. HOLMAN 18 liN 015 1432 MWD RUN 7 AK-MM-80238 M. HANIK J. HOLMAN FWL: 1119 ELEVATION (FT FROM MSL 0) KELLY BUSHING: 50.10 DERRICK FLOOR: 47.40 GROUND LEVEL: 12.70 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 12.250 9.625 3687.0 3RD STRING 8. 500 7.000 8623.0 PRODUCTION STRING 6.000 11041.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1, 2 ARE DIRECTIONAL ONLY AND ARE NOT PRESENTED. 3. MWD RUNS 3, 4 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS. 4. MWD RUN 5 IS DIRECTIONAL WITH NATURAL GAMMA PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. THE CHANGE FROM DGR TO NGP DETECTORS OCCURS AT 8605'MD, 8191'TVD. 5. MWD RUNS 6, 7 ARE DIRECTIONAL, DGR, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). THE CHANGE FROM NGP TO DGR DETECTORS OCCURS AT 9457'MD, 8702'TVD. 6. MWD DATA IN THE INTERVALS 9494'MD, 8703'TVD TO 10417'MD, 8720'TVD AND 10780'MD, 8713'TVD TO ll041'MD, 8694'TVD WAS ACQUIRED ON A MEASUREMENT AFTER DRILLING (MAD) PASS WHILE PULLING OUT OF THE HOLE AFTER MWD RUN 7. 7. MWD RUNS 1 THROUGH 7 REPRESENT WELL L2-11 PB1 WITH API#:50-029-22885-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF ll041'MD, 8694'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SGRD = SMOOTHED GAMMA RAY. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME . SRAT = SMOOTHED TOOL SPEED WHEN NOT DRILLING. CURVES WITH THE EXTENSION "M" REPRESENT MAD PASS DATA. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 3595.0 10979.0 ROP 3701.5 11038.5 FET 9445.5 10986.0 RPD 9445.5 10986.0 RPM 9445.5 10986.0 RPS 9445.5 10986.0 RPX 9445.5 10986.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 3595 8507 8510 8513 8519 8521 8529 8533 8534 8537 8538 8540 8541 8546 8548 8550 8553 8579 8608 8610 8612 8616 8618 8620 8628 8631 8632 8634 8636 8640 8642 .0 .5 .5 .5 .5 .0 .0 .0 .5 .0 .5 .0 .5 .0 5 5 5 5 5 0 0 5 0 5 5 0 0 0 0 0 5 8645.0 GR 3593.5 8506.0 8509.0 8512.5 8519.0 8520.0 8527.5 8531.5 8534.0 8536.0 8537.0 8539.0 8540.5 8546.0 8548.5 8550.0 8552.0 8577.5 8611.5 8612.5 8615 0 8619 5 8621 0 8624 5 8632 0 8635 5 8636 5 8638 5 8642.0 8644.5 8646.0 8647.5 EQUIVALENT UNSHIFTED DEPTH 8647. 8649. 8651. 8652. 8654. 8657. 8658. 8663 8666 8674 8679 8687 8687 8689 8692 8694 8696 8700 8701 8715. 8716. 8717. 8719. 8720. 8721. 8723. 8725. 8729. 8730. 8733. 8735. 8736. 8738. 8740. 8744. 8747. 8748. 8750. 8752. 8753. 8756. 8758 8779 8781 8785 8792 8802 8805 8807 8809 8812 8814 8814 8816 8818 8819 8821 8822 8824 8828 8650.5 8652.5 8654.0 8656.0 8657.5 8659.5 8662.0 8665.5 8668.5 8678.0 8683.0 8689.0 8690.0 8692.0 8695.5 8697.0 8700.0 8703.0 8704.5 8717.5 8719.5 8720.5 8722.0 8723.5 8724.5 8726.0 8727.5 8732.0 8733.0 8735.5 8738.5 8739.5 8740.5 8743.0 8747.5 8750.0 8751.5 8754.0 8755.0 8756.0 8759.0 8760.0 8782.0 8784.0 8787.0 8794.5 8804.0 8807.0 8809.0 8811.5 8815.5 8816.0 8817.0 8818.5 8820.0 8821.5 8823.0 8824.5 8826.0 8830.5 8830.0 8831.5 8834.0 8836.0 8837.5 8840.0 8842.5 8846.0 8848.0 8850.5 8852.5 8853.5 8858.0 8858.5 8888.0 8889.5 8890.0 8891.5 8893.0 8902.0 8904.5 8908.0 8911.0 8915.0 8918.0 8920.5 8921.5 8923.0 8931.0 8932.5 8934.5 8937.5 8939.5 8942.5 8954.0 8955.5 8957.5 8989.0 8991.5 9012.0 9016.5 9019 5 9022 5 9025 5 9027 0 9028 5 9042 5 9045.0 9045.5 9049.0 9049.5 9054.5 9057.5 9059 5 9068 5 9070 5 9073 0 9080 0 9082 5 9085 0 8832.0 8833.5 8836.0 8839.0 8840.0 8841.5 8844.0 8848.0 8850.0 8851.5 8853.5 8856.0 8860.0 8861.0 8889.5 8891.0 8892.0 8892.5 8894.0 8902.5 8906.0 8909.5 8913.0 8917.0 8920.0 8921.5 8922.5 8924.5 8931.5 8932.5 8935.5 8938.0 8940.5 8943.0 8954.5 8955.5 8957.5 8990.5 8993.5 9013.5 9017.5 9020.0 9023.5 9026.0 9028.0 9029.5 9043.5 9045.5 9047.0 9050.5 9051.0 9055.5 9058.5 9060.0 9069.5 9071.5 9073.0 9081.5 9084.0 9086.0 9087.0 9089.0 9092.0 9094.0 9094.5 9096.0 9098.5 9101.0 9103 0 9105 0 9112 0 9114 5 9116 0 9118 0 9147 0 9151 5 9154.5 9159.0 9161.0 9162.5 9165.5 9169.5 9174.0 9178.5 9180.0 9184.0 9186.0 9187.5 9190.5 9195.0 9202.0 9205.0 9220.0 9223.0 9226.0 9240.0 9252.0 9254.0 9256.5 9262.0 9266.5 9269.5 9274.5 9276.5 9280.5 9282.0 9288.0 9328.5 9333.0 9339.5 9342.5 9349.5 9356.5 9368.0 9370.0 9375.5 9411.5 9419.5 11037.5 $ 9088.0 9090.0 9093.5 9095.0 9096.0 9098.0 9099.5 9102.5 9104.0 9105.0 9113.5 9116.0 9118.5 9120.0 9148.5 9153.0 9156.0 9160 0 9163 0 9164 5 9166 5 9169 5 9175 0 9178.5 9181.0 9186.5 9188.0 9189.5 9192.0 9196.0 9202.0 9204.5 9223.0 9225.5 9228.0 9240.5 9253.5 9256.0 9258.5 9262.0 9267.5 9270.5 9275.0 9276.0 9281.0 9283.5 9290.5 9330.5 9334 5 9340 0 9343 0 9352 5 9358 5 9369 5 9370.0 9379.0 9414.5 9423.0 11041.0 MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD $ REMARKS: BIT RUN NO MERGE TOP MERGE BASE 3 3700.0 5583.0 4 5583.0 8636.0 5 8636.0 9509.0 6 9509.0 10418.0 7 10418.0 11041.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD FT/H 4 1 68 GR MWD API 4 1 68 RPX MWD OHMS4 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean Nsam DEPT 3595 11038.5 7316.75 14888 ROP 4.7729 2408.2 120.692 14675 GR 13.0689 597.52 88.6753 14769 RPX 2.9103 2000 30.4226 3082 RPS 4.0045 2000 45.9417 3082 RPM 3.849 2000 69.2322 3082 RPD 0.7717 2000 74.1035 3082 FET 0.7506 49.6433 4.67004 3082 First Reading 3595 3701.5 3595 9445.5 9445.5 9445.5 9445.5 9445.5 Last Reading 11038.5 11038.5 10979 10986 10986 10986 10986 10986 First Reading For Entire File .......... 3595 Last Reading For Entire File ........... 11038.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FI LE SUMMARY PBU TOOL CODE GR FET RPD RPM RPS RPX RAT $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: START DEPTH STOP DEPTH 9493.0 10974.0 9500.0 10981.5 9500.0 10981.5 9500.0 10981.5 9500.0 10981.5 9500.0 10981.5 9553.0 11034.0 MAD RUN NO. MAD PASS NO. MERGE TOP 7 9494.O MERGED MAD PASS. $ MERGE BASE 11041.0 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RAT MAD FT/H 4 1 68 4 2 GR MAD API 4 1 68 8 3 RPX MAD OHMM 4 1 68 12 4 RPS MAD OHMM 4 1 68 16 5 RPM MAD OHMM 4 1 68 20 6 RPD MAD OHMM 4 1 68 FET MAD HOUR 4 1 68 24 28 Name Min Max Mean DEPT 9493 11034 10263.5 RAT 59.1652 6314.06 392.436 GR 32.2376 158.077 73.4041 RPX 3.0168 2000 26.0465 RPS 3.7553 2000 36.5286 RPM 3.5357 2000 59.1396 RPD 3.7394 2000 69.3066 FET 4.6062 145.797 68.5356 Nsam 3083 2197 2133 2132 2132 2132 2132 2132 First Reading 9493 9553 9493 9500 9500 9500 9500 9500 Last Reading 11034 11034 10974 10981.5 10981.5 10981.5 10981.5 10981.5 First Reading For Entire File .......... 9493 Last Reading For Entire File ........... 11034 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE GR ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE START DEPTH STOP DEPTH 3593.5 5553.0 3700.0 5583.5 25-MAY-98 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMS) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 ISC 5.07 MEMORY 5583.0 3700.0 5583.0 .4 27.1 TOOL NUMBER P1024CG6 8.500 8.5 LSND 9.20 42.0 10.3 1800 13.6 .000 .000 .000 .000 32.8 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 API 4 1 68 4 2 ROP MWD 3 FT/H 4 1 68 8 3 Name Min Max Mean Nsam DEPT 3593.5 5583.5 4588.5 3981 GR 13.0689 138.357 71.0534 3920 ROP 8.0859 801.141 208.481 3768 First Reading 3593.5 3593.5 3700 Last Reading 5583.5 5553 5583.5 First Reading For Entire File .......... 3593.5 Last Reading For Entire File ........... 5583.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 5553.5 8604.5 ROP 5585.0 8636.0 $ LOG HEADER DATA DATE LOGGED: 30-MAY-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNH©LE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): 8636.0 TOP LOG INTERVAL (FT) : 5583.0 BOTTOM LOG INTERVAL (FT): 8636.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .4 27.1 TOOL NUMBER P0983CG6 8.500 8.5 LSND 10.50 49.0 7.8 4800 6.6 .000 .000 .000 .000 47.8 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 4 API 4 1 68 4 2 ROP MWD 4 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 5553.5 8636 7094.75 6166 5553.5 GR 15.5727 472.459 110.824 6103 5553.5 Last Reading 8636 8604,5 ROP 5.0413 857.125 98.981 6103 5585 8636 First Reading For Entire File .......... 5553.5 Last Reading For Entire File ........... 8636 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 8605.0 9456.5 ROP 8636.5 9509.0 $ LOG HEADER DATA DATE LOGGED: 03-JUN-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT) : 9509.0 TOP LOG INTERVAL (FT): 8636.0 BOTTOM LOG INTERVAL (FT): 9509.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 26.0 MAXIMUM ANGLE: 86.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE TOOL NUMBER NGP SPC 279 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 6.000 6.0 QU I KDRI L-N 8.60 50.0 8.5 19000 10.0 .000 .000 .000 .000 .5 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 5 API 4 1 68 4 2 ROP MWD 5 FT/H 4 1 68 8 3 46.9 First Name Min Max Mean Nsam Reading DEPT 8605 9509 9057 1809 8605 GR 19.1914 597.52 56.5796 1704 8605 ROP 7.8626 2408.2 76.544 1746 8636.5 Last Reading 9509 9456.5 9509 First Reading For Entire File .......... 8605 Last Reading For Entire File ........... 9509 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name.., Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Con~ment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 9449.0 10372.5 RPD 9449.0 10372.5 RPM 9449.0 10372.5 RPS 9449.0 10372.5 RPX 9449.0 10372.5 GR 9457.0 10365.5 ROP 9509.5 10418.0 $ LOG HEADER DATA DATE LOGGED: 05-JUN-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): 10418.0 TOP LOG INTERVAL (FT): 9509.0 BOTTOM LOG INTERVAL (FT): 10418.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 84.8 MAXIMUM ANGLE: 94.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY P0980SP4 EWR4 ELECTROMAG. RESIS. 4 P0980SP4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 6.000 6.0 QUIKDRIL-N 8.70 51.0 9.1 18500 7.1 ·250 · 123 .190 .380 .5 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 6 API 4 1 68 4 2 RPX MWD 6 OHMM 4 1 68 8 3 RPS MWD 6 OHMS4 4 1 68 12 4 RPM MWD 6 OHMS4 4 1 68 16 5 RPD MWD 6 OHMM 4 1 68 20 6 ROP MWD 6 FT/H 4 1 68 24 7 FET MWD 6 HOUR 4 1 68 28 8 53.9 First Name Min Max Mean Nsam Reading DEPT 9449 10418 9933.5 1939 9449 GR 38.9323 166.132 73.9052 1818 9457 RPX 3.9235 176.763 36.7004 1848 9449 RPS 4.0045 2000 43.5004 1848 9449 RPM 3.849 2000 61.1118 1848 9449 Last Reading 10418 10365.5 10372.5 10372.5 10372.5 RPD 0.7717 2000 64.034 ROP 9.9626 949.219 82.8004 FET 0.7506 49.6433 4.65526 1848 1818 1848 9449 9509.5 9449 10372.5 10418 10372.5 First Reading For Entire File .......... 9449 Last Reading For Entire File ........... 10418 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10366.0 10982.5 FET 10373.0 10989.5 RPD 10373.0 10989.5 RPM 10373.0 10989.5 RPS 10373.0 10989.5 RPX 10373.0 10989.5 ROP 10419.0 11042.0 $ LOG HEADER DATA DATE LOGGED: 09-JUN-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT) : 11041.0 TOP LOG INTERVAL (FT): 10418.0 BOTTOM LOG INTERVAL (FT): 11041.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60..lIN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 88.3 95.4 TOOL NUMBER P0980SP4 P0980SP4 6.000 6.0 QUI KDRI L-N 8.70 58.0 9.0 18500 6.8 .220 .120 .160 .280 56.1 .5 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 7 API 4 1 68 4 2 RPX MWD 7 OHMM 4 1 68 8 3 RPS MWD 7 OHM}4 4 1 68 12 4 RPM MWD 7 OHMM 4 1 68 16 5 RPD MWD 7 OHMS4 4 1 68 20 6 ROP MWD 7 FT/H 4 1 68 24 7 FET MWD 7 HOUR 4 1 68 28 8 Name Min Max Mean DEPT 10366 11042 10704 GR 37.9468 159.509 101.407 RPX 2.9103 2000 21.0211 RPS 5.1481 2000 49.5978 RPM 5.8318 2000 81.393 RPD 7.4783 2000 89.1834 ROP 4.7729 1621.8 76.247 FET 1.1022 27.2782 4.69219 Nsam 1353' 1234 1234 1234 1234 1234 1247 1234 First Reading 10366 10366 10373 10373 10373 10373 10419 10373 Last Reading 11042 10982.5 10989.5 10989.5 10989.5 10989.5 11042 10989.5 First Reading For Entire File .......... 10366 Last Reading For Entire File ........... 11042 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Previous File.Name ....... STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 7 MAD PASS NUMBER: FILE SUI~4ARY VENDOR TOOL CODE START DEPTH GR 9496.5 FET 9503.5 RPD 9503.5 RPM 9503.5 RPS 9503.5 RPX 9503.5 RAT 9556.5 $ STOP DEPTH 10977.5 10984.0 10984.0 10984.0 10984.0 10984.0 11038.0 LOG HEADER DATA DATE LOGGED: S O FTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAlVmtA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 09-JUN-98 ISC 5.07 MEMORY 11041.0 10418.0 11041.0 88.3 95.4 TOOL NUMBER P0980SP4 ?0980SP4 6.000 6.0 Qu I KD RI L- N 8.70 58.0 9.0 18500 6.8 .220 .120 .160 .280 56.1 .5 Name Service Order Units Size Nsam DEPT FT 4 1 GR MAD 7 API 4 1 RPX MAD 7 OHMM 4 1 RPS MAD 7 OHM~ 4 1 RPM MAD 7 OHM~ 4 1 RPD MAD 7 OHMM 4 1 RAT MAD 7 FT/H 4 1 FET MAD 7 HOUR 4 1 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name Min Max DEPT 9496.5 11038 GR 32.2376 158.077 RPX 3.0168 2000 RPS 3.7553 2000 RPM 3.5357 2000 RPD 3.7394 2000 RAT 59.1652 6314.06 FET 4.6062 145.797 First Last Mean Nsam Reading Reading 10267.2 3084 9496.5 11038 73.4041 2133 9496.5 10977.5 26.0465 2132 9503.5 10985 36.5286 2132 9503.5 10985 59.1396 2132 9503.5 10985 69.3066 2132 9503.5 10985 392.363 2198 9556.5 11038 68.5356 2132 9503.5 10985 First Reading For Entire File .......... 9496.5 Last Reading For Entire File ........... 11038 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/04 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/09/04 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Reel Trailer Service name ............. LISTPE Date ..................... 98/09/04 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Technical Scientific Technical Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Wed Sep 09 11:04:19 1998 Reel Header Service name ............. LISTPE Date ..................... 98/09/09 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/09/09 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ..... '..UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: L2-11 PB2 500292288571 ARCO ALASKA, INC. R. ECE 'VED SEP 1 6 t998 Gas Cons. Commission Anchcrage SPERRY-SUN DRILLING SERVICES 09-SEP-98 MWD RUN 3 MWD RUN 4 MWD RUN 5 AK-MM-80238 AK-MM-80238 AK-MM-80238 R. MCNEILL J. FOLEY J. FOLEY P. SMITH P. SMITH J. HOLMAN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: MWD RUN 9 AK-MM-80238 M. HANIK R. BORDES MWD RUN 9 AK-MM-80238 M. HANIK R. BORDES 18 liN 015 1432 MWD RUN 10 AK-M~4-80238 M. HANIK R. BORDES FWL: 1119 ELEVATION (FT FROM MSL 0) KELLY BUSHING: 50.10 DERRICK FLOOR: 47.40 GROUND LEVEL: 12.70 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 12.250 9. 625 3687.0 3RD STRING 8.500 7.000 8623.0 PRODUCTION STRING 6.000 11026.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1, 2 ARE DIRECTIONAL ONLY AND ARE NOT PRESENTED. 3. MWD RUNS 3, 4 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS. 4. MWD RUN 5 IS DIRECTIONAL WITH NATURAL GAMMA RAY PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. THE CHANGE FROM DGR TO NGP PROBE OCCURS AT 8605'MD, 8190'TVD. 5. MWD RUNS 9 AND 10 ARE DIRECTIONAL, DGR AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). THE CHANGE FROM NGP TO DGR DETECTOR OCCURS AT 9475'MD, 8703'TVD. 6. A MEASUREMENT AFTER DRILLING (MAD) PASS WAS PERFORMED IN THE INTERVAL 9150 MD, 8613'TVD TO 10230'MD, 8700'TVD WHILE PULLING OUT OF THE HOLE AFTER MWD RUN 9. 7. ALL MWD RUN 10 DATA IS REAL TIME OWING TO LOSS OF THE TOOL STRING. 8. MWD RUNS 1-5 AND 9-10 REPRESENT WELL L2-11 PB2 WITH API#:50-029-22885-71. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11026'MD, 8686'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SGRD = SMOOTHED GAMMA RAY. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP =~ SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. SRAT = SMOOTHED TOOL SPEED WHEN NOT DRILLING. CURVES WITH EXTENSION OF 'M' DENOTE DATA ACQUIRED ON A MAD PASS. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. .5000 DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR ROP FET RPD RPM RPS RPX $ START DEPTH STOP DEPTH 3595.0 10976.5 3701.5 11022.5 9471.5 10984.0 9471.5 10984.0 9471.5 10183.5 9471.5 10984.0 9471.5 10183.5 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 359 850 851 851 851 852 852 853 853 853 853 854 854 854 854 855 8553 8579 8608 8610 8612 8616 8618 8620 8628 8631 8632 8634 8636 8640 5.0 7.5 0.5 3.5 9.5 1.0 9.0 3.0 4.5 7.0 8.5 0.0 1 5 6 0 8 5 0 5 5 5 5 0 0 5 0 5 5 0 0 0 0 0 GR 3593 8506 8509 8512 8519 8520 8527 8531 8534 8536 8537 8539 8540 8546 8548 8550 8552 8577 8611 8612 8615 8619 8621 8624 8632 8635 8636 8638 8642 8644 .5 .0 .0 .5 .0 .0 .5 .5 .0 .0 .0 .0 .5 .0 .5 .0 .0 .5 .5 .5 .0 5 0 5 0 5 5 5 0 5 EQUIVALENT UNSHIFTED DEPTH 8642.5 8645.0 8647.5 8649.5 8651.0 8652.5 8654.0 8657.0 8658.5 8663 0 8666 5 8674 5 8679 5 8687 0 8687 5 8689 5 8692 5 8694 0 8696.5 8700.5 8701.5 8715.0 8716 5 8717 5 8719 0 8720 5 8721 5 8723 5 8725 0 8729 0 8730.5 8733.5 8735.5 8736.5 8738.0 8740.5 8744.5 8747.0 8748.5 8750.5 8752.0 8753.5 8756.5 8758.0 8779.5 8781.5 8785.0 8792.0 88O2 0 8805 0 8807 0 8809 0 8812 5 8814 0 8814 5 8816 5 8818 0 8819 5 8821 0 8822 5 8646.0 8647.5 8650.5 8652.5 8654.0 8656.0 8657.5 8659.5 8662.0 8665.5 8668.5 8678.0 8683.0 8689.0 8690.0 8692.0 8695.5 8697.0 8700.0 8703.0 8704.5 8717.5 8719.5 8720.5 8722.0 8723.5 8724.5 8726.0 8727.5 8732.0 8733.0 8735.5 8738.5 8739.5 8740.5 8743.0 8747.5 8750.0 8751.5 8754.0 8755.0 8756.0 8759.0 8760.0 8782.0 8784.0 8787.0 8794.5 8804.0 8807 0 8809 0 8811 5 8815 5 8816 0 8817 0 8818 5 8820 0 8821 5 8823.0 8824.5 8824.0 8828.5 8830.0 8831.5 8834.0 8836.0 8837.5 8840.0 8842.5 8846.0 8848.0 8850.5 8852.5 8853.5 8858.0 8858 5 8888 0 8889 5 8890 0 8891 5 8893 0 8902 0 8904 5 8908.0 8911 0 8915 0 8918 0 8920 5 8921 5 8923 0 8931 0 8932 5 8934 5 8937 5 8939 5 8942 5 8954 0 8955.5 8957.5 8989.0 8991.5 9012 0 9016 5 9019 5 9022 5 9025 5 9027 0 9028 5 9042 5 9045 0 9045 5 9049 0 9049 5 9054 5 9057 5 9059 5 9068 5 9070 5 9073 0 9080 0 8826.0 8830.5 8832.0 8833.5 8836.0 8839.0 8840.0 8841.5 8844.0 8848.0 8850.0 8851.5 8853.5 8856.0 8860.0 8861.0 8889.5 8891.0 8892.0 8892.5 8894.0 8902.5 8906.0 8909.5 8913.0 8917.0 8920.0 8921.5 8922.5 8924.5 8931.5 8932.5 8935.5 8938.0 8940.5 8943.0 8954.5 8955.5 8957.5 8990.5 8993.5 9013.5 9017.5 9020.0 9023.5 9026.0 9028.0 9029.5 9043.5 9045.5 9047.0 9050.5 9051.0 9055.5 9O58 5 9060 0 9069 5 9071 5 9073 0 9081 5 9082. 9085. 9087. 9089. 9092. 9094. 9094 9096 9098 9101 9103 9105 9112. 9114. 9116. 9118. 9147. 9151. 9154 9159 9161 9162 9165 9169 9174 9178 9180 9184 9186 9187 9190 9195 9202 9205 9220 9223 9226 9240 9252 9254. 9256. 9262. 9266. 9269. 9274. 9276. 9280 9282 9288 9328 9333 9339 9342 9349 9356 9368 9370 9375 9411 9419 9084.0 9086.0 9088.0 9090.0 9093.5 9095.0 9096.0 9098.0 9099.5 9102.5 9104.0 9105.0 9113.5 9116.0 9118.5 9120.0 9148.5 9153.0 9156.0 9160.0 9163.0 9164.5 9166.5 9169.5 9175.0 9178.5 9181.0 9186.5 9188.0 9189.5 9192.0 9196.0 9202.0 9204.5 9223.0 9225.5 9228.0 9240.5 9253.5 9256.0 9258.5 9262.0 9267.5 9270.5 9275.0 9276.0 9281.0 9283.5 9290.5 9330.5 9334.5 9340.0 9343 0 9352 5 9358 5 9369 5 9370 0 9379 0 9414.5 9423.0 11022.5 11026.0 $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MWD 3 MWD 4 MWD 5 MWD 9 MWD 10 $ REMARKS: MERGED MAIN PASS. $ MERGE TOP MERGE BASE 3700.0 5583.0 5583.0 8636.0 8636.0 9509.0 9475.0 10225.0 10225.0 11026.0 Data Format Specification Record~ Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam DEPT FT 4 1 ROP MWD FT/H 4 1 GR MWD API 4 1 RPX MWD OHMM 4 1 RPS MWD OHMM 4 1 RPM MWD OHMM 4 1 RPD MWD OHMM 4 1 FET MWD HOUR 4 1 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name DEPT ROP GR RPX RPS RPM RPD FET Min 3595 3 3451 13 0689 4 0827 4 3234 4 4185 4 0274 0 6894 First Max Mean Nsam Reading 11022.5 7308.75 14856 3595 2408.2 117.604 14618 3701.5 597.52 88.1908 14690 3595 173.061 20.5057 1425 9471.5 751.476 39.9172 2916 9471.5 2000 34.2828 1425 9471.5 2000 72.2162 2951 9471.5 49.2008 2.10422 2916 9471.5 Last Reading 11022.5 11022.5 10976.5 10183.5 10984 10183.5 10984 10984 First Reading For Entire File .......... 3595 Last Reading For Entire File ........... 11022.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FI LE SUMMARY PBU TOOL CODE FET RPD RPM RPS RPX GR RAT $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: all MAD runs merged using earliest passes. START DEPTH STOP DEPTH 9144.0 10184.5 9144.0 10184.5 9144.0 10184.5 9144.0 10184.5 9144.0 10184.5 9144.0 10177.0 9182.0 10221.5 MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE 9 9146.0 10225.0 MERGED MAD PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MAD API 4 1 68 4 2 RAT MAD FT/H 4 1 68 8 3 RPX MAD OHMM 4 1 68 12 4 RP S MAD OHMM 4 1 68 RPM MAD OHMM 4 1 68 RPD MAD OHMM 4 1 68 FET MAD HOUR 4 1 68 16 20 24 28 Name Min Max Mean Nsam DEPT 9144 10221.5 9682.75 2156 GR 8.0802 172.66 77.3132 2067 RAT 68.7497 625.67 503.402 2080 RPX 1.166 64.8947 19.4316 2082 RPS 1.7247 124.391 25.6788 2082 RPM 2.1442 607.159 38.3124 2082 RPD 3.4888 2000 59.5638 2082 FET 2.6684 281.578 101.183 2082 First Reading 9144 9144 9182 9144 9144 9144 9144 9144 Last Reading 10221.5 10177 10221.5 10184.5 10184.5 10184.5 10184.5 10184.5 First Reading For Entire File .......... 9144 Last Reading For Entire File ........... 10221.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE GR ROP $ LOG HEADER DATA START DEPTH STOP DEPTH 3593.5 5553.0 3700.0 5583.5 DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 25-MAY-98 ISC 5.07 MEMORY 5583.0 3700.0 5583.0 .4 27.1 TOOL NUMBER P1024CG6 8.500 8.5 LSND 9.20 42.0 10.3 1800 13.6 .000 .000 .000 .000 32.8 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 API 4 1 68 ROP MWD 3 FT/H 4 1 68 Name Min Max Mean Nsam DEPT 3593.5 5583.5 4588.5 3981 GR 13.0689 138.357 71.0534 3920 ROP 8.0859 801.141 208.481 3768 First Reading 3593.5 3593.5 3700 Last Reading 5583.5 5553 5583.5 First Reading For Entire File .......... 3593.5 Last Reading For Entire File ........... 5583.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 5553.5 8604.5 ROP 5585.0 8636.0 $ LOG HEADER DATA DATE LOGGED: 30-MAY-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): 8636.0 TOP LOG INTERVAL (FT) : 5583.0 BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 8636.0 .4 27.1 TOOL NUMBER P0983CG6 8.500 8.5 LSND 10.50 49.0 7.8 4800 6.6 .000 .000 .000 .000 47.8 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 4 API 4 1 68 4 2 ROP MWD 4 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading Last Reading DEPT 5553.5 8636 7094.75 6166 GR 15.5727 472.459 110.824 6103 ROP 5.0413 857.125 98.981 6103 5553.5 5553.5 5585 8636 8604.5 8636 First Reading For Entire File .......... 5553.5 Last Reading For Entire File ........... 8636 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 8605.0 9456.5 ROP 8636.5 9475.0 $ LOG HEADER DATA DATE LOGGED: 03-JUN-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): 9509.0 TOP LOG INTERVAL (FT): 8636.0 BOTTOM LOG INTERVAL (FT): 9509.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 26.0 MAXIMUM ~GLE: 86.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NUMBER NGP SPC 279 6.000 6.0 QU I KDRI L-N 8.60 50.0 8.5 19000 10.0 .000 .000 .000 .000 46.9 .5 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 5 API 4 1 68 4 2 ROP MWD 5 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 8605 9475 9040 1741 8605 GR 19.1914 597.52 56.5796 1704 8605 ROP 7.8626 2408.2 77.4678 1678 8636.5 Last Reading 9475 9456.5 9475 First Reading For Entire File .......... 8605 Last Reading For Entire File ........... 9475 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comraent Record FILE HF~ADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9457.0 10180.0 FET 9475.0 10187.0 RPM 9475.0 10187.0 RPS 9475.0 10187.0 RPX 9475.0 10187.0 RPD 9475.5 10187.0 ROP 9475.5 10225.0 $ LOG HEADER DATA DATE LOGGED: 14-JUN-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): 10225.0 TOP LOG INTERVAL (FT) : 9475.0 BOTTOM LOG INTERVAL (FT): 10225.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 80.5 MAXIMUM ANGLE: 96.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY TOOL NUMBER P0980SP4 EWR4 $ ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMS) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 P0980SP4 6.000 6.0 QUIKDRIL-N 8.60 55.0 9.3 18500 6.1 .500 .283 .180 .414 .5 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 9 API 4 1 68 4 2 RPX MWD 9 OHMM 4 1 68 8 3 RPS MWD 9 OHMM 4 1 68 12 4 RPM MWD 9 OHMM 4 1 68 16 5 RPD MWD 9 OHMM 4 1 68 20 6 ROP MWD 9 FT/H 4 1 68 24 7 FET MWD 9 HOUR 4 1 68 28 8 53.9 First Name Min Max Mean Nsam Reading DEPT 9457 10225 9841 1537 9457 GR 40.2806 161.315 90.2076 1447 9457 RPX 4.0827 173.061 20.5057 1425 9475 Last Reading 10225 10180 10187 RPS 4.3234 751.476 24.0167 RPM 4.4185 2000 34.2828 RPD 4.0274 2000 58.7864 ROP 3.3451 1972.27 59.4323 FET 0.8584 49.2008 1.90498 1425 1425 1424 1500 1425 9475 9475 9475.5 9475.5 9475 10187 10187 10187 10225 10187 First Reading For Entire File .......... 9457 Last Reading For Entire File ........... 10225 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FI LE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10181.0 10980.0 FET 10188.0 10988.0 RPD 10188.0 10988.0 RPS 10188.0 10988.0 ROP 10225.5 11026.0 $ LOG HEADER DATA DATE LOGGED: t7-JUN-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): 11026.0 TOP LOG INTERVAL (FT) : 10225.0 BOTTOM LOG INTERVAL (FT): 11026.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION MINIMUM ANGLE: MAXIMUM ANGLE: DEG TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 88.7 94.6 TOOL NUMBER P0980SP4 P0980SP4 6.000 6.0 QUI KDRI L-N 8.80 57.0 8.9 18000 6.0 .210 .112 .100 .190 56.1 .5 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 10 API 4 1 68 4 2 RPS MWD 10 OHMS4 4 1 68 8 3 RPD MWD 10 OHMM 4 1 68 12 4 ROP MWD 10 FT/H 4 1 68 16 5 FET MWD 10 HOUR 4 1 68 20 6 Name Min Max Mean Nsam DEPT 10181 11026 10603.5 1691 GR 32.2581 448.387 75.2404 1525 RPS 6.9724 188.813 55.1031 1491 RPD 8.2443 2000 84.4226 1526 ROP 8.0514 1951.17 68.588 1577 FET 0.6894 16.0673 2.2906 1491 First Reading 10181 10181 10188 10188 10225.5 10188 Last Reading 11026 10980 10988 10988 11026 10988 First Reading For Entire File .......... 10181 Last Reading For Entire File ........... 11026 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FI LE HEADER FILE NUMBER: 8 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 9 MAD PASS NUMBER: FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 9146.0 10188.0 RPD 9146.0 10188.0 RPM 9146.0 10188.0 RPS 9146.0 10188.0 RPX 9146.0 10188.0 GR 9146.0 10180.5 RAT 9184.0 10225.0 $ LOG HEADER DATA DATE LOGGED: 14-JUN-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMS) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MEMORY 10225.0 9475.0 10225.0 80.5 96.9 TOOL NUMBER P0980SP4 P0980SP4 6.000 6.0 QUI KDRI L-N 8.60 55.0 9.3 18500 6.1 .5O0 .283 .180 .414 53.9 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MAD 9 API 4 1 68 4 2 RPX MAD 9 OHMM 4 1 68 8 3 RPS MAD 9 OHlV~ 4 1 68 RPM MAD 9 OHlV~ 4 1 68 RPD MAD 9 OH1MM 4 1 68 R~T M~D 9 FT/H 4 1 68 FET MAD 9 HOUR 4 1 68 12 16 20 24 28 Name Min Max Mean DEPT 9146 10225 9685.5 GR 8.0802 172.66 77.4971 RPX 1.166 64.8947 19.4465 RPS 1.7247 124.391 25.7113 RPM 2.1442 607.159 38.4673 RPD 3.4888 2000 59.8136 RAT 68.7497 625.67 503.398 FET 2.6684 281.578 101.429 Nsam 2159 2070 2085 2085 2085 2085 2083 2085 First Reading 9146 9146 9146 9146 9146 9146 9184 9146 Last Reading 10225 10180.5 10188 10188 10188 10188 10225 10188 First Reading For Entire File .......... 9146 Last Reading For Entire File ........... 10225 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/09 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/09/09 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Reel Trailer Service name ............. LISTPE Date ..................... 98/09/09 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Technical Scientific Technical Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Tue Sep 15 08:47:43 1998 Reel Header Service name ............. LISTPE Date ..................... 98/09/15 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/09/15 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: L2-11 500292288500 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 14-SEP-98 MWD RUN 3 MWD RUN 4 MWD RUN 5 AK-MM-80238 AK-MM-80238 AK-MM-80238 R. MCNEILL J. FOLEY J. FOLEY P. SMITH P. SMITH J. HOLMAN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 9 AK-MM-80238 M. HANIK R. BORDES MWD RUN 9 AK-MM-80238 M. HANIK R. BORDES MWD RUN 10 AK-MM-80238 M. HANIK R. BORDES JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION MWD RUN 11 AK-MM-80238 B. HENNINGSE R. BORDES MWD RUN 11 AK-M~4-80238 B. HENNINGSE R. BORDES SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 18 liN 015 1432 1119 50.10 47.40 12.70 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 9.625 3687.0 8.500 7.000 8623.0 6.000 11485.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1, 2 ARE DIRECTIONAL ONLY AND A_RE NOT PRESENTED. 3. MWD RUNS 3, 4 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS. 4. MWD RUN 5 IS DIRECTIONAL WITH NATURAL GAMMA PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. THE CHANGE FROM DGR TO NGP PROBE OCCURS AT 8605'MD, 8190'TVD, 5. MWD RUNS 9-11 ARE DIRECTIONAL, DGR, ELECTROMAGNETIC WAVE RESISTIVITY PHASE- 4 (EWR4). THE CHANGE FROM NGP TO DGR DETECTOR OCCURS AT 9475'MD, 8703'TVI). 6. ALL MWD RUN 10 DATA IS REAL TIME DATA OWING TO LOSS OF THE TOOL IN HOLE. 7. MEASUREMENT AFTER DRILLING (MAD) PASSES WERE PERFORMED AFTER RUNS 9 AND 11. OVER THE INTERVALS 9150'MD, 8613'TVD TO 10230'MD, 8700'TVD AND 10161'MD, 8703'TVD TO 11484'MD, 8671'TVD. A MERGED VERSION OF THESE INTERVALS IS PRESENTED AS A TAIL TO THIS LOG. 8. MWD RUNS 1-5 AND 9-11 REPRESENT WELL L2-11 WITH API#:50-029-22885-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11485'MD, 8671'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SGRD = SMOOTHED GA_M/W_A RAY. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA-SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. SRAT = SMOOTHED TOOL SPEED WHEN NOT DRILLING. CURVES WITH THE EXTENSION "M" DENOTE MAD DATA. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. .5000 DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR ROP FET RPM RPX RPD RPS $ START DEPTH STOP DEPTH 3595.0 11437.0 3701.5 11482.0 9471.5 11444.0 9471.5 11444.0 9471.5 11444.0 9472.0 11444.0 9472.0 11444.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 3595.0 8507.5 8510 5 8513 8519 8521 8529 8533 8534 8537 8538 8540 8541 8546 8548 8550 8553 8579 8608 8610 8612 8616 8618 8620 GR 3593.5 8506.0 8509.0 8512.5 8519.0 8520.0 8527.5 8531.5 8534.0 8536.0 8537.0 8539.0 8540 5 8546 0 8548 5 8550 0 8552 0 8577 5 8611 5 8612 5 8615 0 8619 5 8621 0 8624.5 EQUIVALENT UNSHIFTED DEPTH 8628.5 8631.0 8632.0 8634.0 8636.0 8640.0 8642.5 8645 0 8647 5 8649 5 8651 0 8652 5 8654 0 8657 0 8658.5 8663.0 8666.5 8674.5 8679.5 8687 0 8687 5 8689 5 8692 5 8694 0 8696 5 8700 5 8701 5 8715 0 8716 5 8717 5 8719 0 8720 5 8721 5 8723.5 8725.0 8729.0 8730.5 8733.5 8735 5 8736 5 8738 0 8740 5 8744 5 8747 0 8748 5 875O 5 8752 0 8753 5 8756 5 8758 0 8779 5 8781 5 8785 0 8792 0 8802 0 8805 0 8807 0 8809 0 8812 5 8814 0 8632.0 8635.5 8636.5 8638.5 8642.0 8644.5 8646.0 8647.5 8650.5 8652.5 8654.0 8656.0 8657.5 8659.5 8662.0 8665.5 8668.5 8678.0 8683.0 8689.0 8690.0 8692.0 8695.5 8697.0 8700.0 8703.0 8704.5 8717.5 8719.5 8720.5 8722.0 8723.5 8724.5 8726.0 8727.5 8732.0 8733.0 8735.5 8738.5 8739.5 8740.5 8743.0 8747 5 8750 0 8751 5 8754 0 8755 0 8756 0 8759 0 8760 0 8782 0 8784 0 8787 0 8794 5 8804 0 8807 0 8809 0 8811 5 8815 5 8816 0 8814.5 8816.5 8818.0 8819.5 8821.0 8822.5 8824.0 8828.5 8830.0 8831.5 8834.0 8836.0 8837.5 8840.0 8842.5 8846.0 8848.0 8850.5 8852 5 8853 5 8858 0 8858 5 8888 0 8889 5 8890 0 8891.5 8893.0 8902 0 8904 5 8908 0 8911 0 8915 0 8918 0 8920 5 8921 5 8923.0 8931.0 8932.5 8934.5 8937.5 8939.5 8942.5 8954.0 8955.5 8957.5 8989 0 8991 5 9012 0 9016 5 9019 5 9022 5 9025 5 9027 0 9028 5 9042 5 9045 0 9045 5 9049 0 9049 5 9054 5 8817.0 8818.5 8820.0 8821.5 8823.0 8824.5 8826.0 8830.5 8832.0 8833.5 8836 0 8839 0 8840 0 8841 5 8844 0 8848 0 8850 0 8851.5 8853.5 8856.0 8860.0 8861.0 8889.5 8891.0 8892.0 8892.5 8894.0 8902.5 8906.0 8909.5 8913.0 8917.0 8920.0 8921.5 8922 5 8924 5 8931 5 8932 5 8935 5 8938 0 8940 5 8943 0 8954 5 8955 5 8957 5 8990 5 8993 5 9013 5 9017 5 9020 0 9023 5 9026.0 9028 0 9029 5 9043 5 9045 5 9047 0 9050 5 9051 0 9055 5 9057 9059 9068 9070 9073 9080 9082 9085 9087 9089 9092 9094 9094 9096 9098 9101 9103 9105 9112 9114 9116 9118 9147 9151 9154 9159 9161 9162 9165 9169 9174 9178 9180 9184 9186 9187 9190 9195 9202 9205 9220 9223 9226 9240 9252 9254 9256 9262 9266 9269 9274 9276 9280 9282 9288 9328 9333 9339 9342 9349 .5 .5 .5 .5 .0 .0 .5 .0 .0 .0 .0 .0 .5 .0 .5 .0 .0 .0 .0 5 0 0 0 5 5 0 0 5 .5 .5 .0 .5 .0 .0 .0 .5 .5 .0 .0 .0 .0 .0 0 0 0 0 5 0 5 5 5 5 5 0 0 5 0 5 5 5 9058.5 9060.0 9069.5 9071.5 9073.0 9081.5 9084.0 9086.0 9088.0 9090.0 9093.5 9095.0 9096.0 9098.0 9099.5 9102.5 9104.0 9105.0 9113.5 9116 0 9118 5 9120 0 9148 5 9153 0 9156 0 9160 0 9163 0 9164 5 9166.5 9169.5 9175.0 9178.5 9181.0 9186.5 9188.0 9189.5 9192.0 9196.0 9202.0 9204.5 9223.0 9225.5 9228.0 9240.5 9253.5 9256.0 9258.5 9262 0 9267 5 9270 5 9275 0 9276 0 9281 0 9283 5 9290 5 9330 5 9334 5 9340 0 9343 0 9352 5 9356.5 9368.0 9370.0 9375.5 9411.5 9419.5 11482.0 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD $ REMARKS: 9358 5 9369 5 9370 0 9379 0 9414 5 9423 0 11485 5 BIT RUN NO MERGE TOP MERGE BASE 3 3700.0 5583.0 4 5583.0 8636.0 5 8636.0 9509.0 9 9475.0 10225.0 10 10225.0 10522.0 11 10522.0 11485.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD API 4 1 68 4 2 RPX MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPM MWD OHMM 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 ROP MWD FT/H 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 Name Min Max Mean Nsam DEPT 3595 11482 7538.5 15775 GR 13.0689 597.52 85.418 15685 RPX 4.0827 2000 47.4597 3276 RPS 4.3234 2000 76.6493 3945 RPM 4.4185 2000 143.38 3276 RPD 4.0274 2000 160.467 3945 ROP 1.021 2408.2 117.908 15562 FET 0.6851 49.2008 1.95408 3946 First Reading 3595 3595 9471.5 9472 9471.5 9472 -3701.5 9471.5 Last Reading 11482 11437 11444 11444 11444 11444 11482 11444 First Reading For Entire File .......... 3595 Last Reading For Entire File ........... 11482 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE FET RPD RPM RPS RPX GR RAT $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: START DEPTH STOP DEPTH 9144.0 11442.5 9144.0 11442.5 9144.0 11442.5 9144.0 11442.5 9144.0 11442.5 9144.0 11436.0 9183.5 11481.0 MAD RUN NO. MAD PASS NO. 9 11 MERGED MAD PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 MERGE TOP 9146.0 10196.0 MERGE BASE 10196.0 11484.5 Depth Units ....................... Datum Specification Block sub-type...0 Name DEPT GR RPX RPS RPM RPD RAT FET Service Order Units Size Nsam FT 4 1 68 MAD API 4 1 68 MAD OHMM 4 1 68 MAD OHM~ 4 1 68 MAD OHMM 4 1 68 MAD OHMM 4 1 68 MAD FT/H 4 1 68 MAD HOUR 4 1 68 Rep Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean DEPT 9144 11481 10312.5 GR 8.0802 172.66 69.0444 RPX 1.166 2000 29.0489 RPS 1.7247 2000 57.0582 RPM 2.1442 2000 97.3459 RPD 3.4888 2000 143.157 RAT 68.7497 642.444 493.089 FET 2.0494 281.578 85.3925 Nsam 4675 4585 4598 4598 4598 4598 4596 4598 First Reading 9144 9144 9144 9144 9144 9144 9183.5 9144 Last Reading 11481 11436 11442.5 11442.5 11442.5 11442.5 11481 11442.5 First Reading For Entire File .......... 9144 Last Reading For Entire File ........... 11481 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 3593.5 ROP 3700.0 $ LOG HEADER DATA DATE LOGGED: S O FTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 5553.0 5583.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined 25-MAY-98 ISC 5.07 MEMORY 5583.0 3700.0 5583.0 .4 27.1 TOOL NUMBER P1024CG6 8.500 8.5 LSND 9.20 42.0 10.3 1800 13.6 .000 .000 .000 .000 32.8 Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 API 4 1 68 4 2 ROP MWD 3 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 3593.5 5583.5 4588.5 3981 3593.5 GR 13.0689 138.357 71.0534 3920 3593.5 ROP 8.0859 801.141 208.481 3768 3700 Last Reading 5583.5 5553 5583.5 First Reading For Entire File .......... 3593.5 Last Reading For Entire File ........... 5583.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUM]WARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 5553.5 8604.5 ROP 5585.0 8636.0 $ LOG HEADER DATA DATE LOGGED: S O FTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Fzame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 30-MAY-98 ISC 5.07 MEMORY 8636.0 5583.0 8636.0 .4 27.1 TOOL NUMBER P0983CG6 8.500 8.5 LSND 10.50 49.0 7.8 4800 6.6 .000 .000 .000 .000 47.8 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 GR MWD 4 API 4 1 68 ROP MWD 4 FT/H 4 1 68 Name Min Max Mean Nsam DEPT 5553.5 8636 7094.75 6166 GR 15.5727 472.459 110.824 6103 ROP 5.0413 857.125 98.981 6103 First Reading 5553.5 5553.5 5585 Last Reading 8636 8604.5 8636 First Reading For Entire File .......... 5553.5 Last Reading For Entire File ........... 8636 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 ~Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 8605.0 9456.5 ROP 8636.5 9475.0 $ LOG HEADER DATA DATE LOGGED: 03-JUN-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT) : 9509.0 TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL G~ PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 8636.0 9509.0 26.0 86.8 TOOL NUMBER NGP SPC 279 6.000 6.0 QUI KDRI L-N 8.60 50.0 8.5 19000 10.0 .000 .000 .000 .000 46.9 .5 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 5 API 4 1 68 4 2 ROP MWD 5 FT/H 4 1 68 8 3 First Last Name Min Max Mean DEPT 8605 9475 9040 GR 19.1914 597.52 56.5796 ROP 7.8626 2408.2 77.4678 Nsam 1741 1704 1678 Reading 8605 8605 8636.5 Reading 9475 9456.5 9475 First Reading For Entire File .......... 8605 Last Reading For Entire File ........... 9475 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9457.0 10180.0 FET 9475.0 10187.0 RPM 9475.0 10187.0 RPX 9475.0 10187.0 RPD 9475.5 10187.0 RPS 9475.5 10187.0 ROP 9475.5 10225.0 $ LOG HEADER DATA DATE LOGGED: 14-JUN-98 SOFTWARE SURFACE SOFTWARE VERSION: ISC 5.07 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT): 10225.0 TOP LOG INTERVAL (FT) : 9475.0 BOTTOM LOG INTERVAL (FT) : 10225.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM TkNGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAb94A RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined 7kbsent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 80.5 96.9 TOOL NUMBER P0980SP4 P0980SP4 6.000 6.0 QUIKDRIL-N 8.60 55.0 9.3 18500 6.1 .500 .283 .180 .414 53.9 .5 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 9 API 4 1 68 4 2 RPX MWD 9 OHMM 4 1 68 8 3 RPS MWD 9 OHMS4 4 1 68 12 4 RPM MWD 9 OHb94 4 1 68 16 5 RPD MWD 9 OHN/~ 4 1 68 20 6 ROP I~D 9 FT/H 4 1 68 24 7 FET MWD 9 HOUR 4 1 68 28 8 Name Min Max Mean DEPT 9457 10225 9841 GR 40.2806 161.315 90.2076 RPX 4.0827 173.061 20.5057 RPS 4.3234 751.476 23.9887 RPM 4.4185 2000 34.2828 RPD 4.0274 2000 58.7864 ROP 3.3451 1972.27 59.4323 FET 0.8584 49.2008 1.90498 Nsam 1537 1447 1425 1424 1425 1424 1500 1425 First Reading 9457 9457 9475 9475.5 9475 9475.5 9475.5 9475 Last Reading 10225 10180 10187 10187 10187 10187 10225 10187 First Reading For Entire File .......... 9457 Last Reading For Entire File ........... 10225 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE GR FET RPD RPS ROP $ LOG HEADER DATA DATE LOGGED: START DEPTH STOP DEPTH 10181.0 10522.0 10188.0 10522.0 10188.0 10522.0 10188.0 10522.0 10225.5 10522.0 17-JUN-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 ISC 5.07 MEMORY 11026.0 10225.0 11026.0 88.7 94.6 TOOL NUMBER P0980SP4 P0980SP4 6.000 6.0 QUIKDRIL-N 8.80 57.0 8.9 18000 6.0 .210 .112 .100 .190 56.1 .5 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 10 API 4 1 68 RPS MWD 10 OHMM 4 1 68 RPD MWD 10 OHM~ 4 1 68 ROP MWD 10 FT/H 4 1 68 FET MWD 10 HOUR 4 1 68 4 8 12 16 20 Name Min Max Mean DEPT 10181 10522 10351.5 GR 32.2581 125.807 59.7487 RPS 13.1223 188.813 79.1703 RPD 35.3469 245.857 104.406 ROP 15.5788 1951.17 77.9166 FET 0.6894 16.0673 2.59188 Nsam 683 683 669 669 594 669 First Reading 10181 10181 10188 10188 10225.5 10188 Last Reading 10522 10522 10522 10522 10522 10522 First Reading For Entire File .......... 10181 Last Reading For Entire File ........... 10522 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET 10522.5 ROP 10522.5 RPD 10522.5 RPM 10522.5 RPS 10522.5 RPX 10522.5 STOP DEPTH 11447.5 11485.5 11447.5 11447.5 11447.5 11447.5 GR 10522 . 5 11440.5 $ LOG HEADER DATA DATE LOGGED: S O FTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY S): MUD PH: MUD CHLORIDES PPM): FLUID LOSS (C3 : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 23-JUN-98 ISC 5.07 MEMORY 11485.0 10522.0 11485.0 85.3 96.7 TOOL NU~4BER P0997GR4 P0997GR4 6.000 6.0 QUIKDRIL-N 9.00 50.0 9.0 17000 5.3 .520 .250 .200 .280 58.6 .5 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Chan~el DEPT FT 4 1 68 0 1 GR MWD 11 API 4 1 68 4 2 RPX MWD 11 OHMM 4 1 68 8 3 RPS MWD 11 OHM~ 4 1 68 12 4 RPM MWD 11 OHMM 4 1 68 16 5 RPD M-WD 11 OHMM 4 1 68 20 6 ROP MWD 11 FT/H 4 1 68 24 7 FET MWD 11 HOUR 4 1 68 28 8 Name Min Max Mean Nsam DEPT 10522.5 11485.5 11004 1927 GR 34.5879 126.668 64.3396 1837 RPX 5.6635 2000 68.2104 1851 RPS 6.2905 2000 116.274 1851 RPM 6.2062 2000 227.369 1851 RPD 7.2403 2000 258.933 1851 ROP 1.021 1501.52 76.9405 1927 FET 0.6851 22.7782 1.75771 1851 First Reading 10522.5 10522.5 10522.5 10522.5 10522.5 10522.5 10522.5 10522.5 Last Reading 11485.5 11440.5 11447.5 11447.5 11447.5 11447.5 11485.5 11447.5 First Reading For Entire File .......... 10522.5 Last Reading For Entire File ........... 11485.5 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF File Header Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 9 MAD PASS NUMBER: FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 9146.0 10190.5 RPD 9146.0 10190.5 RPM 9146.0 10190.5 RPS 9146.0 10190.5 RPX 9146.0 10190.5 GR 9146.0 10183.0 RAT 9186.0 10228.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: 14-JUN-98 ISC 5.07 MEMORY 10225.0 9475.0 10225.0 80.5 96.9 TOOL NUMBER P0980SP4 P0980SP4 6.000 6.0 QUIKDRIL-N 8.60 55.0 9.3 18500 6.1 .5OO .283 .180 .414 53.9 .5 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order DEPT FT 4 1 68 GR MAD 9 API 4 1 68 RPX MAD 9 OHMM 4 1 68 RPS MAD 9 OHMM 4 1 68 RPM MAD 9 OHMM 4 1 68 RPD MAD 9 OHMM 4 1 68 RAT MAD 9 FT/H 4 1 68 FET MAD 9 HOUR 4 1 68 Units Size Nsam Rep Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean Nsam DEPT 9146 10228.5 9687.25 2166 GR 8.0802 172.66 77.6148 2075 RPX 1.166 64.8947 19.2949 2090 RPS 1.7247 124.391 25.4966 2090 RPM 2.1442 607.159 38.1672 2090 RPD 3.4888 2000 60.0657 2090 RAT 68.7497 625.67 503.187 2086 FET 2.6684 281.578 101.49 2090 First Reading 9146 9146 9146 9146 9146 9146 9186 9146 Last Reading 10228.5 10183 10190.5 10190.5 10190.5 10190.5 10228.5 10190.5 First Reading For Entire File .......... 9146 Last Reading For Entire File ........... 10228.5 File Trailer Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.010 Physical EOF File Header Service name ............. STSLIB.010 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.009 Corament Record FILE HEADER FILE NUMBER: 10 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: MAD RUN NUMBER: MAD PASS NUMBER: FILE SUMMARY .5000 11 VENDOR TOOL CODE START DEPTH STOP DEPTH FET 10156.0 11446.0 RPD 10156.0 11446.0 RPM 10156.0 11446.0 RPS 10156.0 11446.0 RPX 10156.0 11446.0 GR 10156.0 11439.5 RAT 10196.0 11484.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MTJD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 23-JUN-98 ISC 5.07 MEMORY 11485.0 10522.0 11485.0 85.3 96.7 TOOL NUMBER P0997GR4 P0997GR4 6.000 6.0 QUIKDRIL-N 9.00 50.0 9.0 17000 5.3 .520 .250 .200 .280 58.6 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .5 Name Service Order Units Size Nsam DEPT FT 4 1 GR MAD 11 API 4 1 RPX MAD 11 OHMM 4 1 RPS MAD 11 OHMM 4 1 RPM MAD 11 OHMM 4 1 RPD MAD 11 OHMM 4 1 RAT MAD 11 FT/H 4 1 FET MAD 11 HOUR 4 1 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name Min Max Mean DEPT 10156 11484.5 10820.2 GR 23.9368 137.978 62.9067 RPX 2.8488 2000 36.4135 R?S 5.8279 2000 81.3598 RPM 6.5934 2000 143.441 RPD 7.3362 2000 211.02 RAT 79.6864 642.444 484.955 FET 2.0494 213.835 70.3531 First Last Nsam Reading Reading 2658 10156 11484.5 2568 10156 11439.5 2581 10156 11446 2581 10156 11446 2581 10156 11446 2581 10156 11446 2578 10196 11484.5 2581 10156 11446 First Reading For Entire File .......... 10156 Last Reading For Entire File ........... 11484.5 File Trailer Service name ............. STSLIB.010 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/09/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.011 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/09/15 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Services Library. Reel Trailer Service name ............. LISTPE Date ..................... 98/09/15 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Technical Scientific Technical Physical EOF Physical EOF End Of LIS File