Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout206-082 STATE OF ALASKA "'ALASKA OIL AND GAS CONSERVATION COMMI N • REPORT OF SUNDRY WELL OPERATIONS * 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate Q Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 206-082 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory El AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21671-01-00 7. Property Designation(Lease Number): ADL 0028285 8. Well Name and Number: PBU G-24A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12382 feet Plugs measured 11490 feet RECEIVED true vertical 9033 feet Junk measured 12348 feet 3 1 i J 2015 Effective Depth: measured 11490 feet Packer measured 9124 feet DECU true vertical 9029 feet Packer true vertical 8103.53 feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"91.5#H-40 40-120 40-120 1490 470 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate 9459 9-5/8"47#L-80 36-9495 36-8394 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10500-11090 feet 11220-11250 feet 11260-11290 feet 11290-11350 feet 11550-11750 feet 11980-12200 12260-12330 feet True vertical depth: 9041 -9035 feet 9036-9034 feet 9034-9031 feet 9031-9026 feet 9031-9032 feet 9032-9031 9033-9033 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 34-10180 34-8928 Packers and SSSV(type,measured and 4-1/2"TIW HBBP Packer 9124 8103.53 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): - g n Treatment descriptions including volumes used and final pressure: HED - i 4 �/�'� 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 48 4324 9 225 189 Subsequent to operation: 999 8335 116.4 240 404 14.Attachments:(required per 20 AAC 25.070.25.071,6 25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature J3Ryl Phone +1 907 564 4424 Date 12/31/15 Form 10-404 Revised 5/2015 e VT I— 1./13/4, A ((6 Ii RBDMS JAN 0 5 2016 Submit Original Only • • I L = O) 1 v (n cfl ) m cu - N- ao N N N a 3 8 i N >. C_ O N N_ — — — cn > > >c co CI) cnpp a) (n N cn _ -O > > > " a) J CO O 13 O O N Cl) j O a) ~ > --c -c) a � +. MF- 0 E E E => c (O a) - Q M E E 3 <o 2 C[) 2 2 > cu C U co TO D 0 2 M O O O 2 "O - D "O - (co < c i ii m L0 m (n a) p a) a) Q- ❑ - ¢ a) a) .a O)>N a) N O - C N C C p I` -aL... C •c > C C aD C — C f- C O O N O O O N = +' C CO N 0 C O ' 0 CO Oo 0 Na-' (n2 0 Oa (n c O U) O (\I ii ,--c) Q .4-2 co E � o � U O o o I . o o C > C) a) > II Q � .c a)� (Ni O o 00 U tY Y -o 0 0 . . °) o a) a) � • -c 3 0 0 CA H N J O a) o N N N Q U O = d N N L o N O m ' 0 00 '' O ii _C o C � o- a)-c c o 0 O E C v 0) LLIvUv --. ter- O = > u� coo LLE _ f° La v v 6- 0 >- N - - N * N C (Ni d E a) Q E U •U 3 ❑ c N N t +.+ Cr 0 N 0 * 0 0 0 (O 4-. a) . L C)- L Q '2 ii) — U a) — .E co)N O -, co N2 — O 0 C� a * Q. C m- Z E 73=, - O) C N = ._q ac) ° 5 a)4 E co _ ° c (n C m a) E u v7 U ._ Lo - d N I- ° � ❑ HUH73H (>n a a ~.tt QQ= 0 , c c v -a 3 a) N o E ' 0 n a) a a) o a) ) a) > -0 -0 2 Y o ❑o a) a) o - � L �-DLLjm � � o Q Q mo 3 0 3 0 Qc° o � Q � � � � � CO c)` ❑ rn�? rn°° d) ami o rn c N -oi Ira; E 3 o o c ' = di c rn.o r a . us - D .c H .c L .c % J O - Q .c Q O O a) Y m 2, CO c c = ,> O = N Q H = C J 2 J 7.5 O 7 ca O C CC a) = -O = U «. - - a0 C C(7 O O tZ — c� Q � ,� c) c _c or) - E � � Y o $ v c � J c C) 3u) � bw § � -§ � ---§ U° CO � � o (� o a) ow °) c 3 c 3 0 � A j5Q — ❑ * ac) a * * co F co Nom_ �Do W ., aci Z,Q CO * -'E' 4* D 2 c ZF-= Z D E D c/ D rn rn am co c c CO I— OOzOH �I � I— > � c * c oN L N 3 a a) I- U � o ._ 0 U -0 w 0 '50 = 0 E a) * a) ; .tb o 0 - E ° ` N co * 0 0m c 2 * 2 2 a o o � E 3 0 * U U O u) o - 0 — w �� � w cB E v) E c° Oo a) E E > c•`) � * �. � �. i- U ) c F- r 1— •() w rn (NI ( = U co) w U co) -0 CC E . � o o .c (n a) uu)) o 3 m u) U •in 0 * < C = c`! = Qm < 0 < 0 .) f(� ) = co a) o E a) ,70—uoi o . QrXQ 0) co rna) . 0 N U) . L L L f-- 2 ❑ O I- 2 a c E L E •i-. U N = Q C 0 * J J - ° ,- ° - ° — a) - O — a) g U) N Ca •Q) a) -0 o O _ .N . .7 o C * J - EECm ' > ' > N � (fl vi ._ '7) a_ ❑ a >w E- >w ❑ p ❑ co ❑ u) j - eL (9 .-5' E ❑ ' E �i LC) -O >. (p - O d ❑ Q ❑ Q O (n > > (n * U * (/) . ❑ a) J Z ❑ a) ct � }, Q (o � O, N .Q a) N Z (n * U) * N JCt * ❑ * J - J - J - - 00Q * 0020 "O O" O (n "OZ N Q* _1 - _1 - L_ w 1— < < (n (n (n (n (c) (n in (n u) 0 0 0 0 0 x- x-0 0 0 0 5 Q N u COti N CV N N N > N N N N N N N N N - - x--- r- l- x- N- C- - 0 Q • • c.,) _a- u) 6 ch m O OX o o ca N N O O 't CO C C +. O_ r .- oa)EL N �O Qo co _0 7 E c) c O7•p�— U>�) U>=) Li_ a CJ > ~ r J Q1 V > > - C 0)r OU O r C O O C -O O C r a) 2 • N N E Eo ._ j a O Y a3 b J Oc I O O O U N (a LO r p V O O O 'C 3 p)M Cn u) $ r a' a 0 N -o r ._ O = a) D 4t _ -0 a) H C. }. 0 CT) = M -' © o u) E E � g0 To 0 a) 0 'p a ~ M C C U �U C o (DI- C O O 0 U _ U v) 0 a to N- a Q__ N a) �_ ON U U E. d -O N La * O ca 4) O L1J to N N (O N CD * 2 ca Q Ei E >,N N U a) _, c0 r 'u) L1J C) C) •J H E '. 2 7 Lo @ r _ J a = - T0) O O Z = z 0 0 ❑_ - 3 in 3 c of � U c c 0 = o a) 0CC 2 .`) -0 N o QS 0) g a) 2 � .E '7 a E = 0N — N J 7 +' -O M a) Es E o)O y M 3 Uco c O Y �) L 0 0 m ca to H L (0j `c a .- (1) C a) Q 3 3 ca U c N = ° a) a_ . C � � � o CO m0 crn� � � 30 0) a) 2 3 w O o X "- ! 4. � t2 -0 c x .- ._ L 4„._ 0 .0 2 co-cNifl .c a) = NLO C Qo ( a) � 7 't G. � a .c c 'Ey) Q ' _ ' it, La c u' who O y+`-, W `C O7 a) ' u) • u) N X r co U N p a) Q C a 0 0 U_ 2 X oo a) N a) N ca N o N El- m > Q a J „j e.,- H r H r tp LU O co j U N (L 51) (' -0 rnw2 , 73 (Uj C 0 O a) a) OrMX >,Q Z I+. Q .� � 0 3 Q � o ° N Q � � � m•s = � Q -0 � o = O - a) co -o o)r = 0 rn c Ln c m o f a' 0) = a),-4, �� C o .0 0 uj Zr• = U o a J .V -o O N ---1 O0 rn 2 N- _ 0 — -O p _0 0 0 — c ti �_ �° m a p E o J Y E CI- 0 m is U c ce N ca O M r ?i U ca O • -0 o m a) Lao U Cl) a) E L as a E CO C CO c 0 o o = o - a) = wa co rn aaa 2 0 0 /: -62 s N tLn > No • o � (0 o 0DUDU0) a) U a) 1: rn a) .- o � M as (n C � N p � (n C - (a O Q E * U * C..) * 6 °-i -a N a 7- * a r a) C X aa)) cEa < a) Eu) H aa) § .c _1mou) .inIinIH < 0_ - cr: 0 ti) -a Lo * U U b E („ cE w 0 c) _ E L w w w rn U m c o w U m E e Et Q Cn Q2 0 ft) � = .in � Q EP Q cln oco .g U aCn O _o c _Cp o _ _ _ _ Q E r 6• NN O -0O �- N NO > _I l •..) U — in N N u) mLO O ,- N - N O > � to N O a ' > N o a = a .c u) c u) ' > 3 L o `� -a a ' > a 3 Q o � • 0 3Q a vo Q . E � n- DQDQ (9 .U2 v � 0 m � acp V C 0 j2 O O F- E' oac0Z p .oa oo aNZC * Co * D .a?O - aj Tc 'cuzp .o T22 - * I- -c7 oOr * HBO . co cr *k � LnaLnH � Or .Q c * H � o a/ off a) * UOEinar * UOm caW Nr * JrJrUOa + QJ .E 2 * 000 _10o_ ?j ; in LU Ln Ln Ln Ln r r C) r C) r C) N N N N N N CD O O r - N r r r r r N N N N N N r r r r r r • S & A / / ' / / � / / / \ R / c -o c ? § f 0 . 0 co � k $ b $ cn 525 22 + » \ o / E 02 $ \ E 0. — g— ) « a) 2 = 6 _c R 3 / k / 03 w c 0 di f c pQ § % _ - a) § % § \ \ ± • \ - \ / to'- � / 22/ 7 c - - / fU f / 7c k $ _ < 2 2mi \ ? 7 Et \ \ / ,.°,:‘)CL r d C 00 # $ \ / & & SAF TREE= CM1/ G-24A COMPOS"" WRAP REPAIR HS E LEAK-DOO IWELLFNOT MIT-OA D= KC Ij4CTUATOR= AXELSON I I OVER 1200 PSI DUE TO DESIGNED PRESSURE RATING OF INITIAL KB.B.B. 72.1' REPAR AND DO NOT RAP METH I METH BLBND INTO OA BF.ED/= 35.91' DUE TO CHEM INCOMPATIBILITY w f EPDXXY RESIN *** KOP= 2900' Max Angle= 95"@ 11268' 2110' —14-1/2"SSSV OTIS LNDNG NP,D=3.813" [ktum Md= 10105 GAS LFT MAPDR>3S Datum TVD= 8800'SS _ ST MD TVD DEV TYPE V LV LATCH PORT U0.TE 5 2983 2983 5 MERLA DOME RM 16 10/05/13 13-3/8"CSG,72#,L-80,D=12.347" I--2692' n L 4 4986 4757 35 M1F32LA 50 RM 20 10/05/13 3 6981 6361 35 MERLA DMY RA 0 04/03/94 Minimum ID = 2.30" @ 9964' 2 8817 7863 38 NE LA DMY RA 0 04/03/94 CMT SHEATH (9964' -10556' 1 9087 8074 39 MERLA "DMY RM 0 04/17/09 ,`� �' *STA#1 =BLOCKED BY IA CENENT F. : 4-1/2"X 9-5/8"PKR SQZ(09/20/13) H»8937'-9124' x; ,A; 9116' —4-1/2"PARKER SWS NP,D=3.813" 1 4-1/2"TBG PUNCH(06/18/13) — 9109'-9112' 9124' —9-5/8"x 4-1/2"TNV FBBP-R RET TOP OF 7"LNR — 9209' PKR W/LATCH,D=4.00" • 9470' --17"MARKER JOINT 9-5/8"CSG,47#,L-80,D=8.681' }-I 9495' A ILNOTE DR&LED CMT OUT OF LNR w/2.3"MLL -POSSIBLE LNR SHEATH TOP OF CENEN T —I 9618' TOP OF CE1BJT H j 9964' 14 11•1 •1/1 9964' H 3.70"DER:DY M34T SLV,D=3.0" 1/ 11 3-1/2"LNR,9.3#,L-80 STL, 10013' /11.1 11� 9983' D 0087 bpf,D=2.992" •' 4111 10013' —13-1/2"X 33116"XO,D=2.800 1.111 1.1�. 4-1/2"TBG,12.6#,L-80 BUTT, --I —10180' 111111 111111 .0152 bpf,D=3.958" /1111 X11+. MLLOUT MOM(G-24A) 10180'- 10192' 111 1,11 WHIPSTOCK H 10181' .11, �`1 WHIPSTOCK1'1 1i RA TAG 10190' ' 1 10539' --I LSL SUB,3-3/16"X 2-7/8"XO,D=2.441" 111 = V1 , _ 11490' H2-718"WFD COP(08/01/14) r , .4.�.�.�.� 414 12348' —FISH SLB SCMT TOOL 7"LNC,26#,L-80,.0383 bpf,D=6.27 -- 10475' A�` BOW SPRING(02/06/07) 3-3/16"LW,62#,L-80 TC1, —1 10539' j `, .0076 bpf,D=2.80" PERFORATION SUMMARY REF LOG:MGR/CCIJTPWTNF OF 02/02/07 PBTD —1 12348' 1''14'1, T1E-N LOG: GEOLOGY PDC LOG ANGLE AT TOP FERE:90"@ 10500' Note:Refer to Production DB for historical perf data 2-7/8"LHR,6.4#,L-80 STL,.0058 bpf,D=2.441" H 12382' SIZE SPF INTERVAL OfIVS(V SHOT SQZ 2" 6 10500- 11090 0 02/02/07 1.56" 6 11220-11250 0 12/12/15 1.56" 6 11260-11350 0 12/12/15 2" 6 11550-11750 C 02102/07 2" 6 11980-12200 C 02/02/07 2" 6 12260-12330 C 02/02/07 DATE REV BY COP*EN S DATE REV BY CONVENTS FRUDHOE BAY INT 12/06/87 ORIGINAL COMPLETION 07/29/14 TBD/JMD PULLED DREAM CATCIFR(7/23/14) WELL: G-24A 02/13/91 FIG WORKOVER 08/13/14 GJB/JM3 SET WFD CBP(08/01/14) PERMIT No:F2060820 02/10/07 NORDIC 1 CTD SIDETRACK(G-24A) 12/16/15 TTR/,MiD ADPERFS(12/16/15) API No: 50-029-21671-01-00 10/06/09 SMYJMD DRLG DRAFT CORRECTIONS SEC 12,T11 N,R13E,2576'FSL&1974'FEL 10/07/13 BSE/JMD GLV C/O(10/05/13) 10/07/13 MSS/JM)SET DREAM CATCHER(10/05/13) BP Exploration(Alaska) Image Projecfi Well Hisfiory File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ... ~~ Well History File Identifier Organizing (done) ,,.e,ded iiiuiiiuuuuu RES AN DIGITAL DATA C for Items: Diskettes, No. Greyscale Items: ~, ~~ ^ Other, No/Type: ^ Poor Quality Originals: ^ Other: NOTES: ~, ae.~,~~eeaea uiuiiouiiiiuii OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Nan-Scannable) ^ Logs of various kinds: ^ Other:: BY: ~ Mariam Date: ~ ~ ~~~ ~ (~ /s/ Y Project Proofing ~~~ ~~~~~~ ~~~~~ ~~ ~~~ BY: Maria ~ Date: ~ / ~ ~ /s/ Scanning Preparation ~ x 30 = ~ + ~-~ =TOTAL PAGES ~J BY: h Maria y Date: ~ I /~ ~ ~ I Q c7 (Count does not include cover sheet) /s/ Production Scanning Stage 1 Page Count from Scanned File: ---C (Count does include cov .sheet) Page Count Matches Number in Scanning Preparation: ,/ YES NO BY: Maria Date: ~ ~ ~ (/~ /s/ ~ I - Stage 1 {f NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. III II ~I (I (II II I I III ReScanned ~II II~I~I IIII~ (~ ~II BY: Maria Date: /s/ Comments about this file: o~a,.~~a«ed uumiiiuimiii P 10!6/2005 Well History File Cover Page.doc IELeEIVED STATE OF ALASKA ' AKA OIL AND GAS CONSERVATION COM ION E `�7 2 j 20 13 REPORT OF SUNDRY WELL OPERATIONS (3C 1.Operations Abandon U Repair Well LI Plug Perforations L1 Perforate U Other ii Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Wei 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development 0 Exploratory ❑ 206-082-0 • 3.Address: P.O.Box 196612 Stratigraphk❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-21671-01-00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028285 . PBU G-24A • 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): LDL,CALIPER PRUDHOE BAY,PRUDHOE OIL . 11.Present Well Condition Summary: Total Depth measured 12382 feet Plugs measured None feet true vertical 9032.66 feet Junk measured 12348 feet Effective Depth measured 12348 feet Packer measured See Attachment feet true vertical 9033.11 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"91.5#H-40 36-116 36-116 1490 470 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate None None None None None None Production 9461 9-5/8"47#L-80 34-9495 34-8393.97 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10500-11090 feet 11550-11750 feet 11980-12200 feet 12260-12330 feet True Vertical depth 9041.13-9035.39 feet 9030.82-9031.57 feet 9031.51-9031.12 feet 9032.57-9033.34 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 34-10180 34-8928.3 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): 8925-9112' SlrMNNED h.1Q E y' E Treatment descriptions including volumes used and final pressure: 11 Bbls 15.8 ppg Cement,485 psi 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 540 43763 13 0 802 Subsequent to operation: 691 46558 16 0 813 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Explorator)Q Development ID • Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil 0 • Gas U WDSPI.❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLU((J 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Garry Catron Email Gar .Catron . BP.Com Printed Name Garry Catron Title PDC PE Signature li 41t1 Cl2 ----5 Phone 564-4424 Date 10/23/2013 RBDMS T 2 5 2 .1 /0/ 13 Form � Form 10-404 Revised 10/2012 Submit Original Only • • Packers and SSV's Attachment ADL0028285 SW Name Type MD ND Depscription G-24A PACKER 9124 8031.18 4-1/2"TIW HBBP Packer G-24A PACKER 10264 8911.22 4-1/2"TIW HBBP Packer Casing / Tubing Attachment ADL0028285 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 91.5# H-40 36 116 36 - 116 1490 470 LINER 971 7"26# L-80 9209 - 10180 8169.42 - 8928.3 7240 5410 LINER 49 3-1/2" 9.3# L-80 9964 - 10013 8764.36 - 8801.98 10160 10530 LINER 526 3-3/16" 6.2# L-80 10013 - 10539 8801.98 - 9040.94 LINER 1843 2-7/8"6.4# L-80 10539 - 12382 9040.94 - 9032.66 10566 11165 PRODUCTION 9461 9-5/8"47# L-80 34 - 9495 34 - 8393.97 6870 4760 SURFACE 1968 13-3/8" 72# L-80 35 - 2003 35 - 2002.99 4930 2670 • SURFACE 690 13-3/8" 72#S-95 2003 - 2693 2002.99 - 2692.98 6390 2820 TUBING 10146 4-1/2" 12.6# L-80 34 - 10180 34 - 8928.3 8430 7500 • . • • L Lo a) .E p O r N N 'V) • p a) c to N Q U Q(0 CO to • 0_ L -J u" ° , 3 , 00 N 2O ° K p 2 I in 0 I ~ *p _C C * �p O (0 Z 2 3 ,0 E E O * WC 2 O cc) 0 w -0 r * J ° 2 O � � p)CD N "c +� c) ( V7 O O _o (0 • Q a) N rn a) o © (n 0 O NH c OLL 5 OH _O Z w ci.c 7 1- Q a m O < - i- a-i — F- � c V 6) O Q m ° > N2ce) 2 0O _ YH g� -J Lr)O O Q = O a) � ,_ � .-. 1— m � cn W W O H W Q O = 0 c rn Cl) 5 O � c � 0U)1 C - L — rn rn w = 0 O a3C � a) 2 ° voa) ,n � © w u) Z o m L L to p L r aid Q —Ca LLI m H O N 0_ y co Q o m e .Q co _, E � ca 3_ 2 Q ~ 2 n ? a - 0 w o � ? � O (J), ° Q Q Ci_ n * � � .. � Zen C -J a 0 � o 0 2 v D 2 c m _ 0 ud a n X rn o Qi P flHHd !N a II M O in m J w F u_ a ) .- CU H CID 0 w.N 1- = Z X m -0 E E • E) a, -o = Z r b a " n Q 5D -a 171- O ° Ow Q aD * c w r a) - L *U * (02LL -I 1 H a) - L ,-J (1) - - u) 02 m O + wH a) x c * ' - c -022 i oS -i rn ( ov rn $ J 0 c)o r (DLLs O. Q > ' LL Z M „ a) a) O_•S _a 73 p y o LC) m 7 m m w o _ p co r ',=-1- O LL r < (6 c E .� l0 ~ p .§ .ei r O Lt' J O CD ce Q. M C'`) W 1 w E O O i LL O a_ Q 4 : CO C7 Q c c r' J V) J < = 0_ a ~ J � (o U) C) N � r P .0 C) a) ,- JZO co O ~ 0 WQ � � W >__j0_ � m� - Eo �w co o" XOZ L _ O a D CD O� JUZaO = ZZ a) cnr c\I 22 O_ aQ QaQ °O O > � aaO Z 201' 2 OlI O g o..-0 c LiO U � - ›- 1- Q ° ca. - > oo pO C °) cusp = w -0 i_ � > OwOZ OnaZZpWwwpn Zw op o C '_' p1c ¢ ° -a ~ mwJ � 1- u � WJ2 � zzwUmz � z _ o = L E c w o i = Q- 1 cZaIL JO a � p � HW m �- H c'o "' v o ,- -a oF= a E ~ cF- p � � JwawO ZZau- XDwZ NO _ c ,-. a) n.a2 m2 mzw (A •5L` JOaZ00co _I1- H_ � OU OJ rii � E a) � Uam_ ° O0J1- _, * ILQ < W < -1, * amw a * — 7:-C a) Mme * 7) CO Q* DLL * : O ( HOa' : : Jm (/) 2J : F- w _0 (7 a c u p Q> E cu O : aU) : r r r r r r r r r r O O N o N r r r r r r r r , r r r r r Daily Report of Well Operations ADL0028285 ***WELL SHUT IN ON ARRIVAL*** (E-LINE TECWELL LEAK DETECT) INITIAL T/I/O 0/0/0 RIH LOGGING AT 100 FPM. - BASELINE PASS TAGGED TD AT 9165' LRS PRESSURED UP THE TUBING TO 2500 PSI, LOGGED UP AT 30 FPM LEAK FOUND IN PKR @ 9124' - CONFIRMED LEAK BY CYCLING PRESSURE CONTINUED LOGGING TO SURFACE LOOKING FOR OTHER LEAKS 11/29/2011 ***JOB IN PROGRESS --CONTINUED 30-NOV-2011 T/I/O=0/0/0 Temp=S/I Assist E-line LDL (Eval failed MIT-IA) Pump 7.3 bbls crude down tubing. Pumped 12 bbls crude down IA to assist E-line with LDL. E-line on well upon departure. ***WSR 11/29/2011 CONTINUED TO 11-30-11*** i?I?II?I?I?I II?I***WELL SHUT IN ON ARRIVAL*** (E-LINE TECWELL LEAK DETECT) INITIAL T/I/O 0/0/0 WELL IS FLUID PACKED, IA FLUID LEVEL NEAR SURFACE. RIG UP AND DO PRESSURE TEST. RIH LOGGING AT 30 FPM. LRS PRESSURED UP THE TUBING TO 2500 PSI. POSSIBLE LEAK NOTICED AT 9124 FT. PERFORMED 2 FT STATION COUNTS TO CONFIRM THE LEAK. BLED DOWN TUBING PRESSURE = 0 PSI. THEN PRESSURED UP TO 2500 PSI TO CONFIRM SIGNATURE LEAK AT 9124 FT. BLED DOWN TUBING AND OPENED TO TANK, PRESSURED UP THE IA TO 2500. BEGIN LOG UP FROM BOTTOM TO SURFACE AT 30 FPM. 11/29/2011 ***JOB IN PROGRESS***TO BE CONTINUED 30-NOV-2011 ***JOB IN PROGRESS*** (E-LINE TECWELL LDL) KEEP LOGGING UP AT 30 FPM AT TO SURFACE. ONCE AT SURFACE, REVIEWED DATA AND CONFIRMED LEAK AT THE PACKER (9130'). NO OTHER LEAKS OBSERVED. DUE TO DISCREPANCIES BETWEEN THE OBSERVED LEAK DEPTHS WHILE PUMPING CRUDE DOWN • THE TUBING (9124')AND WHILE PUMPING CRUDE DOWN THE IA(9130') DECISION MADE TO RIH AND PERFORM STATION COUNTS TO CONFIRM LEAK SIGNATURE DEPTH. BEGAN LOGGING PASS FROM 9000'AT 30 FPM DOWN TO 9141'. PERFORMED 2' STATION COUNTS FROM 9141' TO 9125'. BLED DOWN THE IA TO 0 PSI TO NOTICE DYING LEAK SIGNATURE. PRESSURED UP THE IA BACK TO 2500 PSI AND OBSERVED LEAK SIGNATURE AT 9130'. REVIEW OF DATA CONFIRMED TWO DIFFERENT LEAKS. TUBING LEAK AT 9124'AND LEAK AT THE PACKER'S MID-ELEMENT AT 9130'. POOH. LRS BLED DOWN IA TO 0 PSI. RIG DOWN. CLOSE PERMIT AND LEAVE LOCATION. FINAL T/I/O = 0/0/0 PSI 11/30/2011 ***JOB COMPLETE. WELL LEFT SI UPON DEPARTURE*** ***WSR CONTINUED FROM 11-29-11*** Pumped an additional 8.6 bbls Crude for a total of 20.6 11/30/2011 bbls crude to assist E-line with LDL. Final WHP's 0/0/0 E-line on well at departure • Daily Report of Well Operations ADL0028285 ****WELL S/I ON ARRIVAL****(Cement Squeeze) DIRFT TAG TOP OF WRP @ 9143' SLM PULLED WRP FROM 9146' SLM RAN 3.77"WRP DRIFT, S/D @ 9893' SLM 6/4/2013 ***JOB CONTINUED ON 6/5/13*** ****JOB CONTINUED FROM 6/4/13****(Cement Squeeze) RIG DOWN 6/5/2013 ***JOB COMPLETE, WELL TURNED OVER TO DSO*** T/I/O = 80/70/0+. Temp = SI. TBG FL (EL). No AL. Functioned SSV open. TBG FL @ 260' (4 • bbls). Functioned SSV closed on departure. 6/10/2013 SV, WV, SSV=C. MV=O. IA, OA=OTG. NOVP. 11:50 T/I/O = 90/70/0+. Temp = SI. TBG FL(eline request). No AL. TBG FL© —260' (4 bbls). 6/15/2013 QC crew in control of valve positions upon departure. 21:00 ***WELL SI ON ARRIVAL*** (SLB E-LINE SET PLUG & PUNCH TUBING) INITIAL T/I/O= 0/80/0 PSI RIH:SET BOT 360 QUIK-DRILL COMPOSITE BRIDGE PLUG. ME SET @ = 9140'. TOP OF PLUG @ = 9139'. (PLUG SPECS: OAL= 2.00', OD = 3.595"). POOH RIH: TUBING PUNCHED FROM 9109'-9112'. POOH FINAL T/I/O= 80/80/0 6/18/2013 ***JOB COMPLETE -WELL SI UPON DEPARTURE - PAD OP NOTIFIED OF WELL STATUS*** T/I/0=46/94/130 Temp= SI Circ Well ( Pre Coil ) Speared into Tbg w/5 bbls neat methanol followed by 295 bbls Seawater, 580 bbls crude & 100 Inhibited 1% KCL taking returns up IA over to G-26 F/L to production. Pumped 2 bbls neat methanol & 36 bbls diesel down Tbg to freeze protect. 9/18/2013 Pumped 7 bbls diesel down hardline to freeze protect. FWHP=0/177/236. • CTU#3 1.75" Coil (CV=28.6) Job objective: Packer Squeeze MIRU, Rih w/2 stingers, 2.25" BDJSN (3/4" Ball) to 9117' E (9134' M) Tag CBP. Correct Depth to 9139' elmd. PUH 10' to 9129' celmd ( 9124' M) Flag pipe white w/blue dots. Perform 12 bbl circulation down coil backside up IA to verify 1:1 and make sure wellbore fluid packed. Good test. Stand-by for new 60/40 transport and freshwater offload. 9/19/2013 **Job in Progress** Daily Report of Well Operations ADL0028285 CTU #3 - 1.75" Coil ***Job Continued from WSR 9-18-13*** Job Objective: Packer Cement Squeeze PT Cementers. Laid in 11.0 bbls of 15.8 ppg cement from 9129'to 8403' taking 1:1 returns from the backside. Then squeezed 10.0 bbls through tubing punches behind pipe taking 1:1 returns from the IA. Expected cement is from 9112'to 8925'. Pumped 50 bbls of Powervis to comtaminate any cement left in tubing and then layed in across previous cement interval from 9139'to 8400'. Jet tubing while POOH, circulate out contam and wash any jewely. FP well with 60/40 methanol. 3/4" ball recovered. Notify Pad op of well condition. RDMO to DS2-40 ***Job Complete*** • 9/20/2013 ****Note: GLM station #1 has been cemented off in the IA*** T/I/O=3/240/0 Temp=S/I MIT-IA to 2500 psi (PASSED) (CEMENT SQUEEZE) Pumped 5.59 bbls diesel down IA to reach test pressure. 1st 15 min IA lost 101 psi. 2nd 15 min IA lost 33 psi for a total loss of 134 psi in 30 min. Bled back-5 bbls. Tags hung. SV WV SSV= closed MV IA OA= open. Pad 9/24/2013 op notified. FWHPS=5/240/0 CTU #3 - 1.75" Coil Job Objective: Mill and Fish CBP MIRU CTU 9/25/2013 ...Continued on WSR 9-26-13... CTU #3 - 1.75" Coil. Job Objective: Mill and Fish CBP MIRU CTU 9/25/2013 ...Continued on WSR 9-26-13... CTU #3 - 1.75" Coil ***Continued from WSR 9-25-13*** Job Objective: Mill and Fish CBP Continue to Rig Up CTU. Make up milling BHA with 2 7/8" motor and 3.80" mill, RIH and swap coil to • Slick 1%. Dry tag at 9074' CTMD, begin milling down to plug. 9/26/2013 ...Job in Progress... Daily Report of Well Operations ADL0028285 CTU#3- 1.75" Coil ***Continued from WSR 9-25-13*** Job Objective: Mill and Fish CBP Continue to Rig Up CTU. Make up milling BHA with 2 7/8" motor and 3.80" mill, RIH and swap coil to Slick 1%. Dry tag at 9074' CTMD, begin milling down to plug. Milled cement/stringers to 9135' ctmd, tagged CBP. CBP lost integrity and well went on a vac. PUH, then sat back down at 9137' ctmd, plug not moving. POOH to swap out milling BHA to burn-shoe BHA. RBIH with 2 7/8" motor and 3.76"od x 2.75" id burn shoe. Dry tag plug at 9140' ctmd. Burn slowly over plug to 9143' ctmd. Free to move down hole. Push plug and sat down at 9907' ctmd. PUH. RBIH with pump rolling slowly. Sat down at 9906' ctmd. PUH with 4 k#over pull. RBIH. Sat down dry again at 9906' ctmd. PUH. • Bring on pump at higher rate. RBIH slowly and hard stall at 9906' ctmd. PUH with 5 k#over pull. Dry tag one more time, same 9906' ctmd. Based on a review of previous slickline runs (11/14/11) and related SL depth corrections, indications are that SL found the liner top 55' to 60' shallow. Elect to POOH and inspect BHA. Pulled heavy to SSSV nipple at 2110' and lost-6.8k string wt. Recovered top 1/3 of CBP in burnover shoe. Assume lower 2/3 of CBP hung up and broke off at SSSV nipple. Discuss. Rerun same assy to fish/breakup lower part of CBP. Sat down at 2565'. Had clean PU. Continue RIH w/no wt loss or set downs until reaching prior depth of 9906' CTM 9/26/2013 ** In progress ** CTU #3 w/ 1.75" CT(CTV=28.5) Objective-mill out/fish CBP after packer squeeze Burn over remaining CBP at 9905' and had two hard stalls-assume this is the TOL. POH to check for recovery and had -3" of CBP. Rerun 3.80" 3 bladed junk mill to 9906'. Attempted to mill up any remaining debris and found none. Stalled after milling -5 min on TOL. POH. FP wellbore w/30 bbls McOH 9/27/2013 Job complete ***WELL S/I ON ARRIVAL***(cement squeeze) RAN 3.70" LIB TO DEPLOYMENT SLEEVE @ 9892' SLM (9964' MD)(impression of dep slv) MADE TWO ATTEMPTS TO SET 4-1/2" DREAM CATCHER IN X-NIP @ 9,116' MD 10/4/2013 ***CONT. ON 10/5/13 WSR*** ***CONT. FROM 10/4/13 WSR***(cement squeeze) SET 4-1/2" DREAM CATCHER @ 9102' SLM (9116' MD) RAN 4-1/2" CHECKSET TO 9101' SLM (sheared) SET WHIDDON CATCHER SUB @ 9,098' SLM PULLED STA.#4 RM-DGLV @ 4,970' SLM (4,986' MD) & STA.#5 RA-DGLV @ 2,963' SLM (2.983' MD) SET GENERIC DESIGN PULLED EMPTY WHIDDON CATCHER SUB @ 9,098' SLM 10/5/2013 ***WELL S/I ON DEPARTURE *** Daily Report of Well Operations ADL0028285 T/I/0=10/10/0 Temp=SI Assist Slickline (Cement Squeeze) Pump 55 bbls crude down TBG to assist slickline pull a valve. 10/5/2013 FWHP=0/0/0 Slickline on well upon departure CV's=OTG T/I/O = 680/1580/10. Temp = 50°. WHP's (Post Squeeze). Poor Boy Gas Lift rigged up from G-25 T to G-24 IA. AL open @ casing valve. ALP= 1580 psi. 10/17/2013 SV= C. WV, SSV, MV= 0. IA, OA= OTG. NOVP. 1010 T/I/O= 650/790/40. Temp= 62°. WHPs (Post Squeeze). Temp. gas lift hardlined from G-21 @ 2000 psi, SI @ casing valve. TP decreased 30 psi, IAP decreased 790 psi (AL SI) & OAP increased 30 psi overnight. 10/18/2013 SV=C. WV, SSV& MV=0. IA& OA=OTG. NOVP. 1415 hrs. • T/I/0 = 620/840/100. Temp = 66°, WHP's (Post Squeeze). TP decreased 30 psi, IAP increased 50 psi, OAP increased 60 psi overnight. 10/19/2013 SV= C. WV, SSV, MV= 0. IA, OA= OTG. NOVP. 1230 T/I/0 = 670/880/180. Temp= 68*. WHP's (Post Squeeze). No AL. TP increased 50 psi, IAP increased 40 psi and the OAP increased 80 psi in —15 hours. 10/20/2013 SV= C. WV, SSV, MV= 0. IA, OA= OTG. NOVP. 0315 hours. T/I/0= 700/870/220. Temp.= 68*. WHPs (Post Squeeze). No AL. TP increased 30 psi, IAP decreased 10 psi, OAP increased 40 psi. since 10/20/13. 10/21/2013 SV= C. WV,SSV,MV= O. IA& OA= OTG. NOVP. 1700 hrs • WELLHEAD= Mc EV • G_2 4 A COMPOSTE WRAP BAR SH LEAK-DO NOT MAT-OA ACTUATOR= AXELSON OVER 1200 PSI DUE TO DESK PRESSURE RATING OF INMAL KB.EL& 721' 1 REPAR AND DO NOT PUMP METH/METH BLEND INTO OA BF ELEV= 35.91' DUE TO CHEM NCOMAATBUITY w I EPDXXY RESIN '^' KOP= 2900 Max Angle.= 95 11268' 2110' 4-1/2"SSSV OTIS LACING NP,D=3.813" Datum MD= 10105' GAS LIFT MANDRELS Datum TV D= 8800'SS ST MD TV F7 DEV TYPE VLV LATCH PORT DATE 5 2983 2983 5 MERLA DOME MI 16 10/05/13 13-3/8"CSG,72#,L-80,D=12.347" H 2692' 4 4986 4757 35 WE RLA SO RM 20 10/05/13 3 6981 6361 35 MERLA DAN RA 0 04/03/94 Minimum $D = 2.30" @ 9964' 2 8817 7863 38 1,1133tA DMY RA 0 04/03/94 CMT SHEATH (9964' -10666') ',\';'1 1 1 9087 8074 39 MERLA 'DMY MI 0 04/17/09 'STA#1=BLOCKED BY IA CEMENT 4-1/2"X 9-5/8"PKR SQZ(09/20/13) —893T-9124' .' OA L 9116' —j4-1/2"PARKER SWS MP,D=3.813" l 4-1/2'TBG PINCH(06118/13) —I 9109'-9112' :'`' Wli 9116' I-14-1/2"DREAM CATCHER(10/05/13) ►mot ►.t 9124' 1—9-5/8"x 4-1/2°17W HBBP-R RET TOP OF 7"LNR 9209' PKR WA ATCH,D=4.00" 9470' H7"MARKER JOINT 9-5/8"CSG,47#,L-80,D=8.681" H 9495' NOTE DRILLED CMT OUT OF LNR w/2.3"MIL -POSSIBLE LNR SHEATH TOP OF CE3MENT H 9618' 11 • .• TOP OF CEPU 1T 1 9964' 14 '. ...e 9964' -1 3.70"D�l_OY MEW SLV,D=3.0" I /1 1 /14 111 AV 3-1/2"LNR,9.3#,L-80 STL, 10013' t.0 ►T1!� P,9983' H3-1/2"FES x N D=2.813' I 1.1.0087 bpf,D=2.992' :���1 ►�1�1� 111.* ►"111• 10013' —I 3-1/2"x 33/18^xo,D=2.600" 4-1/2"TBG,12.6#,L-80 BUTT, —I —10180' It* �•�1.• .0152 bpf,ID=3.958' 11/11 1111111 11.* • ■• MLOUT WINDOW G-24A) 10180'-10192' WI-*STOCK —{ 10181' `l...., 1.0, P 1 ,.4... 11/,• '••4 ■∎ RA TAG -1 10190' /�1 , !X11 I 10539'-1 LSL SUB,3-3/16"X 2-7/8"XO,D=2.441" OA--- - -Av4 tzisf.•, '''' kl 12348' —F ISFt SLB SCMT TOOL• 7"LM 26#,L-80,.0383 bpf,13=6.276" H 10475' , BOW Sf*3(02/06/07) 3-3/16'EAR 6.2#,L-80 TCI, 10539' ` .0076 bpf,D=2.80" ■ PERFORATION SUMMARY e4�*.*/p REF LOG:MGR/CCLJTNWTIF OF 02/02/07 PBTD H 12348' TE-N LOG: GEOLOGY PDC LOG ANGLE AT TOP PELRF:90° 10500' 12-7/8"LNR,6.4#,L-80 STL,.0058 bpf,13=2.441" —1 12382' Note:Refer to Aoduction CB for historical pert data SIZE SEF INTERVAL OPN+SQZ SHOT SC)Z 2' 6 10500-11090 0 02/02/07 2" 6 11550-11750 0 02/02/07 2" 6 11980-12200 0 02/02/07 2" 6 12260-12330 0 02/02/07 DATE REV BY COMMENTS DATE REV BY COMMENTS FPRUDHOE BAY UNIT 12/06/87 ORIGINAL COMPLETION 10/07/13 JRP/JMD SET PKR SQZ(09/20/13) WELL: G-24A 02/13/91 PIG WORKOVBR 10/07/13 CJS/JMD REMOVE CBPMSC CORRECTIONS FERMI Nit:"1060820 02/10/07 NORDIC 1 CTD SIDETRACK(G-24A) 10/07/13 BSE/JM 3 GLV GO(10/05/13) AA No: 50-029-21671-01-00 10/06/09 SMJM3 DRLG DRAFT CORRECTIONS 10/07/13 MSS/JMD SET DREAM CATCHER(10/05/13) SEC 12,T11 N,R13E,2576'FSL&1974'FE.. 10/27/09 TTw/SV SAFETY NOTE 06/20/13 ATO/JMD SET CBPITBG PUNCH(06/18/13) BP Exploration(Alaska) • . bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 18, 2012 i1t 0AUG t 2012 Mr. Jim Regg Alaska Oil and Gas Conservation Commission / °12" 333 West 7 Avenue aD b " Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB G -Pad Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad G that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator . I, BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10-404) G -Pad Date: 03/05/2012 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na qal G -01A 1931710 50029202140100 3.0 NA 3.0 NA 10.2 5/10/2010 G -02B 2081580 50029202170200 0.5 NA 0.5 NA 2.6 5/10/2010 G -03A 1970700 50029202210100 0.7 NA 0.7 NA 6.0 5/27/2010 G-04B 2061400 50029202250200 0.1 NA 0.1 NA 1.7 5/10/2010 G -05 1780970 50029203510000 0.0 NA 0.0 NA 0.0 5/10/2010 G-06A 2060120 50029203580100 0.6 NA 0.6 NA 5.1 5/12/2010 G -07 1790180 50029203590000 0.5 NA 0.5 NA 3.4 5/11/2010 G -08A 2061830 50029205810100 0.1 NA 0.1 NA 0.9 5/27/2010 G -09B 2071100 50029205820200 9.0 NA 9.0 NA 69.7 5/20/2010 G -10C 2060090 50029205530300 0.9 NA 0.9 NA 8.5 3/5/2012 G -11B 2080270 50029205830200 0.0 NA 0.0 NA 0.0 5/21/2010 G -128 2031410 50029205970200 0.5 NA 0.5 NA 2.6 5/13/2010 G -13A 2001630 50029206000100 0.0 NA 0.0 NA Trace 5/12/2010 G -148 2090680 50029206460200 0.7 NA 0.7 NA 5.1 5/22/2010 G -158 2080650 50029206470200 26.0 4.0 0.5 7/16/2011 3.4 7/19/2011 G -16A 2090560 50029206430100 0.0 NA 0.0 NA Trace 5/22/2010 G -17A 2060760 50029206190100 21.4 4.0 0.6 7/16/2011 . 3.4 7/19/2011 G -18A 1990320 50029206200100 71.7 14.0 1.0 7/16/2011 8.5 7/19/2011 G -19B 2071240 50029215990200 0.0 NA 0.0 NA Trace 5/22/2010 G -21 1951540 50029226040000 0.5 NA 0.5 NA 3.4 5/12/2010 G -23B 2091440 50029216800200 0.5 NA 0.5 NA 4.3 5/11/2010 - G -24A 2060820 50029216710100 0.1 NA 0.1 NA 0.9 5/11/2010 G -258 2070860 50029216520200 5.3 NA 5.3 NA 23.8 5/28/2010 G -26B 2050480 50029216610200 2.0 NA 2.0 NA 6.8 5/11/2010 G -27A 2070310 50029216460100 0.5 NA 0.5 NA 2.6 5/30/2010 G -29B 2101410 50029216500200 2.8 NA 3.0 NA 17.0 5/13/2010 G -30C 2091510 50029216130300 1.0 NA 1.1 NA 5.1 5/30/2010 G -318 2090310 50029216160200 0.8 NA 0.8 NA 6.0 5/21/2010 G -32A 1970010 50029216360100 0.8 NA 0.8 NA 3.4 5/21/2010 1 i ! .y ~. ~ -ter 'M, ~ 'rA.Ys:. u''~... ~ :w i MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMISSI~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ^ Repair Well ^ Plug Pertorations ^ Stimulate^ Other Q WH REPAIR Pertormed: Alter Casing ^ Pull Tubing^ Pertorate New Pool ^ Waiver^ Time Extension ^ FURMANITE Change Approved Program ^ Operat. Shutdown ^ Pertorate ^ Re-enter Suspended Well ^ WRAP 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development Q Exploratory ^ 206-0820 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ 6. API Number: Anchorage, AK 99519-6612 50-029-21671-01-00 8. Property Designation (Lease Number) : 9. Well Name and Number: ADLO-028285 PBU G-24A 10. Field/Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: 1 MAR ~ O 2010 Total Depth measured 12382 feet Plugs (measured) None feet true vertical 9032.66 feet Junk (measured) 12348' 2/6/f~~a~pt,.'&~~~ llJJtl ~~Q~ Effective Depth measured 12348 feet Packer (measured) 9124 true vertical 9033.11 feet (true vertical) 8103 Casing Length Size MD TVD Burst Collapse Structural Conductor 110 20" SURFACE - 110 SURFACE - 110 Surtace 2693 13-3/8" 72# L-80 SURFACE - 2693 SURFACE - 2693 5380 2670 Intermediate 9495 9-5/8" 47# L-80 SURFACE - 9495 SURFACE - 8394 6870 4760 Production Liner 972 7"26# L-80 9209 - 10181 8169 - 8929 7240 5410 Liner 2418 3-1/2"X3-3/16X2-7/8 9964 - 12382 8764 - 9033 9.3#/6.2#/6.4# Perforation depth: Measured depth: O 10500 - 11090 O 11550 - 11750 O 11980 - 12200 O 12260 - 12330 True Vertical depth: 9041.13 - 9035.39 9030.82 - 9031.57 9031.51 - 9031.12 9032.57 - 9033.34 _ Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# L-80 SURFACE - 10181' SURFACE - 8929 Packers and SSSV (type, measured and true vertical depth) 9-5/8"X4-1/2" TIW HBBP-R-RET PKR 9124 8103 12. Stimulation or cement squeeze summary: Intervals treated (measured): /~ p ; ~ ~t1~~ ~FIC~ ~ t ~~~ ~' ' i . l r;J f~ - Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: SI Subsequent to operation: 1197 38667 21 735 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ^~ Service ^ Daily Report of Well Operations X 16. Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: X44 ~ ~' Contact Gary Preble 3 •I Printed Name Gary Prebl Title Data Management Engineer Signature Phone 564-4944 Date 3/9/2010 Form 1 - I•(O ~ ~ G-24A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY ? 3/8/2009 T/I/0= 25/0/0. Temp= SI. Assist Furmanite Composite Wrap SH repair. (WH 'REPAIR). Continued open bleed on OA during curing of Furmanite composite wrap to maintain 0 psi on OA. Final WHPs= 25/0+/0. Cellar temp was 92 deg F. Night shift continued to miantain open bleed. Furmanite Techs applied final f layers of carbon fiber wrap. Allow to cure overnight. SV,WV= C. SSV,MV= O. IA,OA= OTG. NOVP. 3/8/2009~T/I/O = 30/0/0. Temp SI. Assist with open bleed for Furmanite Composite °Wrap SH repair. No AL. Maintained open bleed on IA & OA. Cellar temp=103.5° @ 6:30 am. SV, WV=Shut. SSV, MV=Open. IA & OA=OTG. NOVP. 3/9/2009 ~.........._.~...,....,,.~~.~~ m _..~...... ...... ~~~..,.~.....~.~.....~ . ~~~.~ T/I/0= 25/8/0+ Temp= SI. Assist with open bleed for Furmanite Composite Wrap SH repair. Shut-in OA bleed @ 1:20 pm. WHPs=25/10/0+. Started 3 hour monitoring, IAP increased 2 psi, OAP went to 0 psi. Final WHPs=25/12/0. Furmanite Techs applied final epoxy resin coat to the composite wrap. Composite Wrap application complete. Allow to cure with heater for 7 days... SV,WV= shut. SSV,MV= open. IA,OA= open to gauge. NOVP. 3/10/2009T/I/O = 25/17/0+. Temp = SI. Bleed OAP to 0 psi x2 per shift. No AL. Heaters operating smoothly. TP unchanged, IAP increased 5 psi, OAP is <1 psi. SV, WV=Shut. SSV, MV=Open. IA & OA=OTG. NOVP. 3/10/2009~T/I/0=25/19/0. Temp=S1. WHPs (post Furmanite). No AL. TP unchanged, IAP :increased 2 psi, OA has no positive pressure. =SV,WV=Closed. SSV,MV=Open. IA & OA=OTG. NOVP. 3/11/2009~T/I/0= 25/30/0. Temp= SI. WHPs (post Furmanite). TP unchanged, IAP increased 11 psi, OAP unchanged overnight. [SV,WV= C. SSV,MV= O. IA,OA= OTG. NOVP. ~ ~ a T/I/0= 30/30/0. Temp= SI. WHP's (post- Furmanite). Two heaters on location heating cellar. TP increased 5 psi, IAP unchanged, OAP unchanged overnight. SV,WV=C. SSV,MV=O. IA,OA=OTG. NOVP. 3/13/2009 T/I/0= 30/30/0. Temp= SI. WHPs (post Furmanite). One heater on location heating cellar. No change in WHPs. SV,WV= C. SSV,MV= O. IA,OA= OTG. NOVP. 3/14/2009 T/I/0=30/30/0+. Temp=S1. WHP's (post Furmarnte). One Heater in well house. WHP's unchanged overnight. `SV,WV=closed.SSV,MV=open.lA,OA=OTG.NOVP. 3/15/2009~T/I/0=50/40/O+.~Temp=S1. WHPs (post~Furmanite). No AL. TP increased 20 !psi, IAP increased 10 psi & OAP increased from 0 psi to 0+ psi since 03113/09. ASV=Closed. WV, MV, SSV=Open. IA & OA=OTG. NOVP. 3/16/2009 ~ T/I/0=50/40/0+. overn fight. ASV, WV=Closed e~_ , .n~~ Temp=S1. WHPs (post Furmanite). WHPs unchanged SSFV, MV=Open. IA&OA=OTG. NOVP. r i 3/17/2009~T/I/O= 50/23/0. Temp SI. WHPs (post-Furmarnte). No AL. TBGP unchanged, IAP decreased 17 psi, OAP unchanged. SV, WV,= C. SSV, MV= O. IA, OA= OTG. NOVP. _e _.. e._ . ~ _~. _ _ ~ _ ___. ~ _ ___ _ .. ~ ~ ..~_ ~ __.. ~ _____ 4/5/2009jT/I/O=50/40/10 Temp=S1 MIT OA 700 psi FAILED (Repair starting head) Pumped 4.7 bbls of 45* crude down OA for MIT OA 1st test 1st 15 min lost 390 'psi .Pumped 30 bbls of 40* crude down OA before establishing OA LLR @ 0.44 bpm @ 725 psi for 9 bbls Pumped 30 bbls @ 3.6 bpm @ 1000 psi, Pumped 39 bbls @ 5 bpm 1100 PSI. Furmanite & flutes look good, no leaks. FWHP's=75/40/700 DSO notified of following upon departure WV,SWV=S/I SSV,MV,IAV,OAV=Open Tags hung EE= cM~ WELLHEAD = ACTUATOR = McEVOY AXELSON KB. ELEV = 72.06' BF. ELEV = 35.91' KOP = 2900' Max Angle = 95° @ 11268' Datum MD = 10105' Datum TV D = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" Minimum ID = 2.30" @ 9964' CMT SHEATH (9964' -10556') TOP OF 7" LNR ~ G-24A 9-518" CSG, 47#, L-80, ID = 8.681" ~ 9495' TOP OF CEMENT 9618' TOP OF CEMENT - 3-112" LNR, 9.3#, L-80 STL, I 10013' .0087 bpf, ID = 2.992" WHIPSTOCK 10181' RA TAG 10190' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" ~-j 10475' PERFORATION SUMMARY REF LOG: MGR/CCL/TNNiTNF OF 02/02/07 TIE-IN LOG: GEOLOGY PDC LOG ANGLE AT TOP PERF: 90° @ 10500' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OPWSOZ DATE 2" 6 10500 - 11090 O 02/02/07 2" 6 11550 - 11750 O 02102107 2" 6 11980 - 12200 O 02(02/07 2" 6 12260 - 12330 O 02/02/07 ~. 3-3116" LNR, 6.2#, L-80 TCII, .0076 bpf, ID= 2.80" SAFELY **COMPOSITE WRAP REPAIR SH LEAK- DO NOT METH OR METH BLEND INTO OA DUE TO CHEM INCOMPATIBILITY W/EPOXY RESIN IN WRAP**WELL ANGLE> 70° @ 10376'. 2110' 4-1/2" SSSV OTIS LNDNG NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 2983 2983 5 MERLA DMY RA 0 04!03194 4 4986 4757 35 MERLA DMY RM 0 04/17/09 3 6981 6361 35 MERLA DMY RA 0 04/03/94 2 8817 7863 38 MERLA DMY RA 0 04(03/94 1 9087 8075 39 MERLA DMY RM 0 04(17109 9116, I-j4-1/2" PARKER SWS NIP, ID = 3.813" ( 9124' 9-5/8" x 4-112" TM/ HBBP-R RET PKR W/LATCH, ID = 4.00" 9470' 7" MARKERJOINT~ NOTE: DRILLED CMT OUT OF LNR w /2.3" MILL POSSIBLE LNR SHEATH -~ 9964' 3.70" DEPLOYMENT SLV, ID = 3.0" 9983' 3-1/2" HES X NIP, ID 2.813" 10013' 3-1/2" X 3-3/16" XO, ID = 2.800" MILLOUT WINDOW (G-24A) 10180' - 10192' 10539' LSL SUB, 3-3/16" X 2-718" XO, ID = 2.441" I 10539' [ PBTD -~ 1234$' ~ 2-7/8" LNR, 6.4#, L-80 STL, .005$ bpf, ID = 2.441" 12382' DATE REV BY COMMENTS DATE REV BY COMMENTS 12106/87 ORIGINAL COMPLETION 08/22/08 KJB/SV SET PLUG/GLV GO (08/04!08) 02!13/91 RIG WORKOVER 05/31/09 SEW/TLH GLV GO (04/17/09} 02/10/07 NORDIC 1 CTD SIDETRACK (G-24A) 10!05!09 lJMD XX PLUG PULLED (04117/09} 02/12/07 /PAG DRAFT CORRECTIONS 10!06/09 SM/JMD DRLG DRAFT CORRECTONS 02/13/07 SMM/PAG DRAFTCORRECTIONS 2 10/27/09 TNVlSV SAFETY NOTE 03/01!07 KSB/TLH GLV GO FISH: SLB SCMT TOOL BOW SPRING (02/06107} PRUDHOE BAY UNIT WELL: G-24A PERMIT No: ®2060820 API No: 50-029-21671-01-00 SEC 12, T11 N, R13E, 2576' FSL & 1974' FEL BP Exploration (Alaska) DATA SUBMITTAL COMPLIANCE REPORT 11 /18/2008 Permit to Drill 2060820 Well Name/No. PRUDHOE BAY UNIT G-24A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-21671-01-00 MD 12348 TVD 9033 Completion Date 2/10/2007 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATI ON Types Electric or Other Logs Run: MWD DIR / GR / RES, CNL / GR /CCL, CBL (data ta ken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments D D Asc Directional Survey 36 12382 Open 3/6/2007 R~~pt Directional Survey 36 12382 Open 3/6/2007 4'ED D Asc Directional Survey 36 12205 Open 3/6/2007 PB 1 ~t Directional Survey 36 12205 Open 3/6/2007 PB 1 "', Log Cement Evaluation 5 Col 1 9602 12208_ Case 7/3/2007 MCBL, PSP, GR, CCL, VDL 5-Feb-2007 ~D C Las 15627~'Induction/Resistivity 9476 12379 Case 10/26/2007 LAS ATR, RPM, GR, ROP w.PDF graphics frED C Las 15628 `eduction/Resistivity 9476 12204 Case 1 012 6/2 0 0 7 P61 LAS ATR, RPM, GR, I/ ROP w.PDF graphics ;,/Log Neutron 5 Blu 8912 12242 Case 4/28/2008 MCNL, GR, CCL, TNN, II D C Lis 16163 ~eutron 8886 12246 Case 4/28/2008 TNF 2-Feb-2008 LIS Veri, GR, CNT pt LIS Verification 9476 12380 Open 11/7/2008 LIS Veri, GR, ROP, RAD, ' RAS, RPD, RPS ~ ~ ~ r'ED C Lis 17112 eduction/Resistivity 9476 12380 Open 11/7/2008 LIS Veri, GR, ROP, RAD, ', RAS, RPD, RPS ~pt LIS Verification 9476 12206 Open 11/7/2008 PB1 LIS Veri, GR, ROP, ~ ~~ ~ RAD, RAS, RPD, RPS j, D C Lis 17113 nduction/Resistivity 9476 12206 Open 11/7/2008 P61 LIS Veri, GR, ROP, //~~ f RAD, RAS, RPD, RPS ~~ 'Log Induction/Resistivity 25 Col 10180 12380 Open 11/7/2008 MD MPR, GR 28-Jan-2007 I~Log Induction/Resistivity 25 Col 10180 12380 Open 11/7/2008 ND MPR, GR 28-Jan-2007 ,, /Log Gamma Ray 25 Col 10180 12380 Open 11/7/2008 MD GR 28-Jan-2007 ! ~! Log See Notes 2 Col 9460 12380 Open 11/7/2008 Depth Shift Monitor Plot C~ DATA SUBMITTAL COMPLIANCE REPORT 11 /18/2008 Permit to Drill 2060820 Well Name/No. PRUDHOE BAY UNIT G-24A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-21671-01-00 MD 12348 TVD 9033 Completion Date 2/10/2007 ~og Induction/Resistivity -Log Induction/Resistivity •~o Gamma Ray Log See Notes Well Cores/Samples Information: Name ADDITIONAL INFORMATION C ? Y /~ Well ored Chips Received? `Y7lQ- Analysis ~`f N` Received? Comments: Compliance Reviewed By: Completion Status 1-OIL Current Status 1-OIL UIC N 25 Col 10180 12205 Open 11/7/2008 PB1 MD MPR, GR 27-Jan- 2007 25 Col 10180 12205 Open 11/7/2008 PB1 TVD MPR, GR 27-Jan- 2007 25 Col 10180 12205 Open 11/7/2008 P61 MD GR 27-Jan-2007 2 Col 9460 12210 Open 11/7/2008 P61 Depth Shift Monitor Plot Sample Interval Set Start Stop Sent Received Number Comments Daily History Received? Y / N Formation Tops Date: __ ~_ I ° ~v-~~ v CUMYAN Y WELL NAME FIELD ~_ "~ ~ -~ BAKER F~Y6ME5 Baker Atlas PRINT DISTRIBUTION LIST BY EXYLUKA'1'lUN (ALASKA) 1NC CUUN'1'Y NUK'1'H SLUPE BUKUUGH G-24A STATE ALASKA PRUDHOE BAY UNIT DATE 10/15/2008 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 1292115 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKAI INC 1 Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 802 ANCHORAGE, AK 99508 ANCHORAGE. AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE, AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated Bv: BAKER ATLAS-PDC 17015 Aldine Westfield. Houston, Texas 77073 This Distribution List Completed Bv: C. ~- 2°~` Page 1 of 1 ®>/ ®® BAKER NVGHES Baker Atlas PRINT DISTRIBUTION LIST CUMYAN Y BY EXYLUKA'1'lUN (ALASKA) 1NC CUUN"1'Y NUK'1'H SLUYE BUKUUGH WELL NAME G-24APB1 STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 10/15/2008 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO#: 1292115 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS Address LR2-I Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 802 ANCHORAGE AK 99508 ANCHORAGE, AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE, AK 9901 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated Bv" BAKER ATLAS-PDC 17015 Aldine Westfield Houston, Texas 77073 This Distribution List Comoleted Bv: l~ ~ J~ V / D~~ (o' ~6 Page 1 of 1 • i INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: G-24A Contains the following: 1 LDWG Compact Disc ;¢ (Includes Graphic Image files) s~ 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - MPR/Directional TVD Log (to follow) 1 color print - MPR/Directional Measured Depth Log (to follow) 1 color print - MadPass MPR/Directional Measured Depth Log (to Follow) LAC Job#: 1292115 ~o~ -db a f~ r - 3 Sent by: Catrina Gu'dry Date: 10/15/08 Received by: Date: /0~3/ ~~ .~ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ 7260 Homer Drive ~ Anchorage, Alaska 99518 Direct: (907) 267-6612 INTEQ FAX: (907) 267-6623 i • INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: G-24APB1 Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - MPR/Directional TVD Log (to follow) 1 color print - MPR/Directional Measured Depth Log (to follow) LAC Job#: 1292115 ao~-ova 1 ~-rr3 Sent by: Catrina Guidry Date: 10%15%08 Received by: Date: ._. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING `& RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 r~,. _ Baker Hughes INTEQ ~t 7260 Homer Drive B~ ~ Anchorage, Alaska 99518 Direct: (907) 267-6612 INTEQ FAX: (907) 267-6623 04/25/08 ~~illlUmll~i~~~i~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well .Inh !k NO.4673 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 _ 1 nn rlncr ..N.... n_a_ 2-52/S-14 11846807 PRODUCTION PROFILE (REDO) 08/18/07 1 1 F-22 12005209 MEM TEMP SURVEY 04/08/08 1 1 MPB-09 11963093 MEM PROD PFOFILE - ~ 04/13/08 1 1 MPL-33 11963090 MEM INJECTION PROFILE 04/11/08 1 1 MPF-89 11963092 MEM TEMP SURVEY 04/i2/08 1 1 L5-29 11963087 MEM TEMP SURVEY Q 04/04/08 1 1 S-26 12071843 SBHP SURVEY ~ 04/03/08 1 1 06-15 11962594 LDL ~ _ (0 04/09/08 1 1 W-30 12034892 PROD PROFILE f~Fi4f-13~ 1(„/•(~ 04/11/08 1 1 L-221 11962592 USIT/CBL ~a~ ~D~ .- ( ~~/ 04/07/08 1 1 4-14A/S-37 11970818 CH EDIT PDC GR JEWELRY ~_ ~ 03/24/08 1 18-32B 11978442 MCNL - fit. 02/26/08 1 1 G-24A 11660525 MCNL 'tb 02/02/07 1 1 BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. ~ - Anchorage, Alaska 99508 Date Delivered: +~ fist ~ ~ j~~p r 1 ~J Alaska Data & Consulting Service 2525 Gambell Street, Suite 40 Anchorage, AK 99503-2838 ATTN: Beth ~-~" 1 Received by: ~~ ~a Date 10-12-2007 Transmittal Number:92914 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) If you have anv questions, vlease contact Douglas Dortch at the PDC at 564-4973 slivery Contents __ CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: ?-126 ab~=~c_.'~_~5"bl~.__._ ?-1_~GC_ap~_C~ ~`1s~~___,___-_ _ ?-16CPB1a0 ~--OPl~--~-tS6f9 - __ ~. ~ , -J- _ _ _ __ _ .. 15-166_x(, - v~3__.__c~6a1__ 15-16BP61 _ ~j~~~-3 ~,5-~ ___ 15-166P62~=^~~ tysG,a3 _ 18-27D~Q~-L33 ~4~~~----._._._ . 18-27DP61 _ _aa_~_t~~__~_Sl~S=- ___.__. __-.__._-_ A-42A___v~Xa.-t3.C~ tS~a~._.....__ .. _.__.- G-24AP61 aUlo_-Dc`~.a..-.!~`~c______._....v____-_ P2-11 APB1 . a(acc.-o.o'l_fo_-,._l~z~._Q_,..._._____ ....._ P2-37A aOS=-OS~~-__..l. __~~Gr_3a P2-37APBt .. ~:Q,S'._OS ~-_~.~f©-33.,-.~ .-._.- 102 '`--- ------ 102PB Please Sign and Return one copy of this transmittal. Thank You, Douglas Dortch - Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 - .:= --:_ ~r ~~`~~r . K r:... Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 995 1 9-66 1 2 06/29/07 r ~ ~J Alaska Data 8 Consulting Services 2525 Gambeli Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth wQu .Inh it r ~u~ 0 3 zaaz ~~ Qis ~ ~a~5 . , 1 .,., ne~~.l.,rl,,., N0.4324 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay n~~e nl C..1.., cn H-13 11676950 GAS ENTRY SURVEY 06/20/07 C-41 11801077 LDL 06/19/07 A-30A 11661159 MEM PROD PROFILE 06/23/07 1 W-21A 11661140 MEM PROD PROFILE 04/21/07 1 E-216 11661157 MEM PROD PROFILE 06/19/07 1 M-23 11626107 PRODUCTION PROFILE 06/23/07 1 01-21 11824330 PRODUCTION PROFILE 06/22/07 1 J-25A 11767130 MEM PROD PROFILE 06/18/07 1 Z-08A 11630483 GLS/PROD LOG 06/22/07 1 M-34 11824330 PRODUCTION PROFILE 06/22/07 1 02-306 11594512 LDL 06/23/07 1 Z-29 11686758 PRODUCTION PROFILE 06/15/07 1 5-38 11801078 LDL 06/20/07 1 H-37A 11594506 PPROF/IPROF (REVISED) 06/05/07 1 N-15 11637129 PROD PROFILE (REVISEb) 06/13/07 1 Z-13A 11649962 MEM PROD PROF (REVISED) 04/21/07 1 P2-15A 11594511 SCMT 06/15/07 1 12-05 11676951 USIT (CEMENT) 06/24/07 1 12-05 11676951 USIT (CORROSION) 06/24/07 1 B-15 11626097 USIT 06/14/07 1 G-24A 11628750 SCMT 02/05/07 1 r'LCNJC MVr\nIVYYLCUl7C RCtrClt'1 6t All7NINl7 ANU Kt1UKNINt9 VNt (:VYr tAt;rt IU: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. '~~( y^ Anchorage, Alaska 99508 ~~ ^ ~ O pC Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received bv: ~~ RECEIVES STATE OF ALASKA • ~;PH Q ~L~I~A OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Alaska Oil & G aS COI1S, CQf-1Rt~SSI0t1 Revised 04!05/07: Put on Production 1 a. Well Status: ®Oil as lugged ^ Abandoned ^ Suspended ^ WAG 1 b. Well Class: zoAACZS.~os zoAACZS.>>o ®Development ^ Exploratory ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other ^ Stratigraphic ^ Service 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 2/10/2007 206-082 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 1!22/2007 50-029-21671-01-00 ~ 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: ' ' 1/28/2007 PBU G-24A- 2703 FNL, 1974 FEL, SEC. 12, T11 N, R13E, UM Top of Productive Horizon: 8. KB Elevation (ft): 15. Field /Pool(s): 941' FNL, 71' FWL, SEC. 18, T11 N, R14E, UM 72.1 ~ Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD+TVD) ~ Pool 2137' FNL, 1348' FEL, SEC. 13, T11N, R13E, UM 12348' + 9033 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 658255 y- 5968946 Zone- ASP4 12382 ~+ 9033 ~ Ft ADL 028285 TPI: x- 660375 y- 5965473 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 658982 y- 5964247 Zone- ASP4 None MD 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey ®Yes ^ No N/A MSL 1900' (Approx.) 21. Logs Run: MWD DIR / GR / RES, CNL / GR / CCL, CBL 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" Surface 110' Surface 110' 9 cu ds Concrete 13-3/8" 72# L-80 Surface 2693' Surface 2693' 17-1/2" 3258 cu ft PF'E' 465 cu ft PF -5/8" 47# L-80 Surface 949 ' Surface 8394' 12-1/4" 575 cu ft Class'G' 7" 26# L-80 9209' 10181' 8169' 8929' 8-1/2" 383 cu ft Class'G' a-vz° X s-s» s° x zare° .3# ~ 6.2# ~ 6.4# L-80 9964' 12382' 8764' 9033' 4-1 /8" 174 cu ft Cla s 'G' & 39 cu ft 'G' 23. Perforations open to Production (MD + TVD of Top and 24. Tuellvc RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD 2" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 10181' 9124' MD TVD MD TVD (TOW) 10500' - 11090' 9041'- 9035' FRACTURE 25. ACID CEMENTSOUEEZE ETC 11550' - 11750' 9031' - 9032' , , , . 11980' - 12200' 9032' - 903i' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 12260' - 12330' 9033' - 9033' Freeze Protect w/ 26 Bbts McOH 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): March 17, 2007 Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO 4/1/2007 6 TEST PERIOD 811 2,000 -0- 96 2,465 Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK) Press. 700 820 24-HOUR RATE• 3,244 7.998 -0- 27. CORE DATA ~ ~ ~ ~ Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separates t, if..aosry). Submit core chips; if none, state "none". l ~ ~ ~`°' ~ ~' ~ ' •- $:Adj. ~~ , ~ Y ~~ 20Q7 None fJ 'y" ~ Form 10-407 Revised 12/20041 t ~ ~ ~ ~ 1~ I,~'CONTINUED ON REVERSE SIOE ~,{ r ~~ ~-- V , ` ~ lYl L \ t ~ ~~ GEOLOGIC MARKE 29. ORMATION TESTS Include and briefly summarize test results. List intervals tested, NaMe MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sadlerochit /Zone 1 B / 14N 10288' 8996' None TDF /Zone 1A / 13N 10430' 9039' TDF /Zone 1A / 13N 10490' 9041' Top Zone 1 B /Base Zone 2A 11213' 9036' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. j~ ~ , 71 Signed TerrieHubble Title Technical Assistant Date ~/ V PBU G-24A 206-082 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number Permit No. / A royal NO. Drilling Engineer: Sean McLaughlin, 564-4387 INSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only ~~ EIVED STATE OF ALASKA ~ ~'~O? ALASKA OIL AND GAS CONSERVATION COMMISSION ~~.~ MAR 0 9 2007 WELL COMPLETION OR RECOMPLETION REPORT AND L(~~slta Dil $ bas Cons. COrnmission ~nehnrona 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zoAACZS.,os zoAACZS.,,o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1 b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Ab 2/10/2007 ~ 12. Permit to Drill Number 206-082 ~ 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 1/22/2007 13. API Number 50-029-21871-01-00 ~ 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 1/28/2007 14. Well Name and Number: PBU G-24A1 2703 FNL, 1974 FEL, SEC. 12, T11 N, R13E, UM - Top of Productive Horizon: 941' FNL, 71' FWL, SEC. 18, T11N, R14E, UM 8. KB Elevation (ft): 72.1 ~ 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay ~ Total Depth: 2137' FNL, 1348' FEL, SEC. 13, T11 N, R13E, UM 9. Plug Back Depth (MD+TVD} 12348 + 9033 Ft Pool 4b. Location of Well (State Base Plane Coordinates): Surface: x- 658255 y- 5968946 Zone- ASP4 10. Total Depth (MD+TVD) 12382 ~ + 9033 Ft 16. Property Designation: _ ADL 028285 TPI: x- 660375 y- 5965473 Zone- ASP4 Total Depth: x- 658982 y- 5964247 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: ~a~.fl~'~y,~S 9Q3.~'TYd MWD DIR / GR / RES, CNL / GR / CCL, CBL ~'~~ 22. CASING, LINER AND CEMENTING RECORD ' CASING SETTING DEPTH MD SETTING DEPTH''TVD HOLE AMOUNT SIZE WT. PER FT. GRADE TOP BOTTOM TOP: BOTTOM SIZE CEMENTING RECORD PULLED 20" Surface 110' Surface 110' 9 cu ds Concrete 13-3/8" 72# L-80 Surface 2693' Surface 2693' 17-1/2" 3258 cu ft PP'E' 465 cu ft PF 9-5/ " 47# L-80 Surface 9495' rface 83 4' 12-1/4" 575 cu ft Class'G' 7" 26# L-80 9209' 1 1 1' 8169' 8929' 8-1/2" 383 cu ft Class'G' 3-1/z" x 3-3116" x zaia~~ .3# / 6.2# ~ 6.4# L-80 9964' 12382' 8764' 9033' 4-1 /8" 174 cu ft Class 'G' & 39 cu ft 'G' 23. Perforations open to Production (MD + TVD of Top and 24. TU81NG RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD 2" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 10181' 9124' MD TVD MD TVD (TOW) 10500' - 11090'' 9041' - 9035' 11550' - 11750' 9031' - 903$' $ 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11980' - 12200' ~ 9032' - 9031' DEPTH INTERVAL MD AMOUNT Se KIND OF MATERIAL USED 12260' - 12330' - 9033' - 9033' Freeze Protect w/ 26 Bbls McOH 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A __--=-- Date of Test Hours Tested PRODUCTION FOR TEST PERIOD OIL-BBL GAS-MCP WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing Press. Casing Pressure CALCULATED 24-HOUR RATE• OIL-BBL GAS-MCP WATER-BBL OIL GRAVITY-API (CORK} 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet,. if necessary). Submit core chips; if none, state "none". None ~~' ~~~ ~ S- Form 10-407 ReVISed 12/20p3 ., CONTINUED ON REVERSE SIDE ry "~' ~ ~~~ "`~~ ~ 3 L~~l 28. GEOLOGIC MARKE 29. ORMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sadlerochit7 Zone 1 B / 14N 10288' 8996' None TDF /Zone 1 A / 13N 10430' 9039' TDF /Zone 1A / 13N 10490' 9041' Top Zone 1 B /Base Zone 2A 11213' 9036' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. ~ Signed Terrie Hubble Title Technical Assistant Date ~~ PBU G-24A 206-082 Prepared By NameMumber. Terrie Hubble, 564-4628 Well Number Permit No. / A r val No. Drruing Engineer: Sean McLaughlin, 564-4387 INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Irene 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Irea~ 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22; Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Irene 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". Irene 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only BP EXPLORATION Operations Summary Report Legal Well Name: G-24 ~,. ~ ~~ ~ ~`.~ Common Well Name: G-24 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date i From - To Hours ~ Task I~Code NPT 1/20/2007 100:00 - 18:00 18.00 ~ RIGU I P 18:00 - 19:00 I 1.001 RIGU I P 19:00 - 20:00 1.00 STWHIP P 20:00 - 20:30 0.50 STWHIP P 20:30 - 00:00 I 3.501 STWHIPI P 1/21/2007 100:00 - 02:30 I 2.501 STWHIPI P 02:30 - 03:30 I 1.001 STWHIPI N Start: 1 /20/2007 Rig Release: 2/10/2007 Rig Number: N1 Page 1 of 16 ~ Spud Date: 12/5/1986 End: 2/10/2007 Phase Description of Operations PRE PRE WEXIT WEXIT WEXIT WEXIT WEXIT 03:30-05:00 1.50 STWHIP P WEXIT 05:00 - 06:00 1.00 STWHIP P WEXIT 06:00 - 07:00 1.00 STWHIP N SFAL WEXIT 07:00 - 07:15 0.25 STWHIP P WEXIT 07:15-11:00 3.75 STWHIP P WEXIT 11:00 - 16:30 5.50 STWHIP N SFAL WEXIT 16:30 - 17:45 1.25 STWHIP N SFAL WEXIT 17:45 - 18:00 0.25 STWHIP N SFAL WEXIT 18:00 - 19:30 1.50 STWHIP N WEXIT 19:30 - 21:20 ~ 1.831 STWHIP N WEXIT 21:20-21:40 I 0.331STWHIPIP I (WEXIT Continue with modifications on rig. Change out breaker in SCR room. Seal penetration into Ops cab. General prep for rig operations. SAFETY SHUTDOWN. Held meeting with both crews and all personnel involved with Nordic 1 CTD. We discussed past operations and a safe plan forward. Talked to all personnel about Safety first and slow progress forward with new tools and procedures. Check on BHI tools. Load Baker motor and mills onto floor. SAFETY MEETING. Review procedure, hazards and mitigation for cutting coil, M/U BHI CTC and M/U BHI BHA. Used Nordic 2 BHA Makeup procedure and modified it as needed. Pick up injecter and cut off 8' of coil. Meg E-Line, 2000 Ohms, good test. M/U SW S CTC. M/U SW S CTC and pull test with 35K. M/U BHI upper quick connect with Eline connection. Torque connection. Pump 4 bbl, 2# Biozan water. Found leak in SWS swivel on Reel stand. Install new reel swivel. Pressure test with 4000 psi. . Fill coil with 2# Biozan at 2.2 bpm. Note. In Micromotion is not working. Pull injecter to side. Very tight. Open up well. Well is dead. M/U window milling BHA #1 with a 3.80" HC DP0261 DWM, 3.80" diamond string reamer, BOT Xtreme straight motor, & BHI Coiltrack BHA (OAL - 55.42'). M/U injector. Found short in BHI surface equipment. Repair high voltage power supply box. Circ. at min rate. Prep to RIH with BHA. RIH with milling BHA #1 circ @ min rate & synchronizing depths with BHI. BHI damaged SIU unit for communications b/w dowhole tools & suface computers. Replace SIU unit with spare one & attempt to communicate with downhole tools -not successful. Park BHA @ 6191'. Fetch replacement comms unit from Nordic-2 & attempt to communicate with downhole tools - no luck. Observe faulty hi-voltage power supply unit. W.O. another BHI replacement hi-voltage power supply &comms units to be shipped up from ANC on 15:18 Alaska Airlines Commercial flight. POOH to function test BHA#1. OOH. S/B injector & suspend BHA in slips. Function test BHI spare colitrack BHA & BHA in hole -all tested OK. Double check rig grounding, good ground. RIH with same BHt Coiltrac BHA. Tools OK. RIH at 90 fpm. Circ. at 0.6 bpm. 1000 psi. Reel working well. Up wt at 8500' = 35K. RIH to 9500'. Log down with GR tie-in at 9500'. Log at 150 fph. Added 2.5' to CTD. Printed: 2/12/2007 10:13:51 AM BP EXPLORATION Operations Summary Report Page 2 of 16 ~ Legal Well Name: G-24 Common Well Name: G-24 D~ Spud Date: 12/5/1986 Event Name: REENTER+COMPLETE Start: 1/20/2007 End: 2/10/2007 Contractor Name: NORDIC CALISTA Rig Release: 2/10/2007 Rig Name: NORDIC 1 Rig Number: N1 Date :From - To Hours Task ~ Code NPT Phase Description of Operations __ ~_ _ ___ __ 1 _ _ _ _ _ _ _ _ -__ _ __ _ -- 1/21/2007 21:40 - 22:00 0.33 STWHIP P WEXIT RIH. Tag top of whipstock on depth at 10,180'. 22:00 - 00:00 2.00 STWHIP P WEXIT Mill 3.8" window thru 4-1/2" and 7" liner, 2.6 bpm, 2500 psi, 1 fph, 1-3K WOB. Top of window at 10,180'. Steady milling. Milled to 10,182'. 1/22/2007 00:00 - 03:00 3.00 STWHIP P WEXIT Mill 3.8" window thru 4-1/2" and 7" liner, 2.6 bpm, 2500 psi, 1 fph, 2-3K WOB. Top of window at 10,180'. Milled to 10,185'. 03:00 - 05:00 2.00 STWHIP P WEXIT Mill 3.8" window thru 4-1/2" and 7" liner, 2.6 bpm, 2600 psi, 1 fph, 2-3K WOB. Milled to 10,188'. Load 1-1/4" CSH workstring into pipeshed. 05:00 - 06:30 1.50 STWHIP P WEXIT Mill 3.8" window thru 4-1/2" and 7" liner, 2.6 bpm, 2700 psi, 1 fph, 2-4K WOB. Milled to 10,189'. Pick up clean to 10170'. Free spin = 2400 psi, Up wt = 37K, Down wt = 21 K. Ream back to bottom clean. 06:30 - 08:30 2.00 STWHIP P WEXIT Control mill 3.8" window thru 4-1/2" & 7" liner to 10190' with 2.6/2700psi, 4-5k DWOB & 0.5fph ave ROP. 08:30 - 09:30 1.00 STWHIP P WEXIT Control mill 3.8" window thru 4-1/2" & 7" liner to 10191' with 2.6/2700psi, 4-5k DWOB & 0.5fph ave ROP. Seems Tike we're in formation now. 09:30 - 11:45 2.25 STWHIP P WEXIT Mill 10' formation to 10201' with 2.5/2550psi, 4.5fph ave ROP & 2k DWOB. Geo confirmed Z-2A -pebbly sandstone in samples. 11:45 - 15:15 3.50 STWHIP P WEXIT Swap wellbore to new 8.6 ppg flopro mud with 8ppb K-G & 2% L-T. Meanwhile backream/dress window/rat hole 3x & drift 2x. Window looks clean. Tentative window depths are: TOWS/TOW = 10180', RA PIP Tag = 10188.6'. BOW = 10191'. 15:15 - 16:30 1.25 STWHIP P WEXIT POOH window milling BHA#1 to 6000'. Observe problem with injector -not pulling OK. 16:30 - 17:30 1.00 STWHIP N SFAL WEXIT POOH slowly ~ 3fpm while W.O. SLB Mechanic. SLB Mecahnic adjust injector counterbalance & injector started pulling fine. 17:30 - 18:30 1.00 STWHIP P WEXIT Continue POOH to surface. 18:30 - 19:30 1.00 STWHIP P WEXIT Lay out milling BHA. Window mill and string reamer gauged at 3.79" Go / 3.78" NoGo. 19:30 - 19:45 0.25 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for M/U BHI drilling BHA. Reviewed rig alarms. 19:45 - 21:00 1.25 DRILL P PROD1 M/U BHI build BHA #2 with HCC BiCenter Bit, 2.2 deg Extreme motor and Coiltrac BHA with orienter and RES tool. OAL = 78.92'. Test all tools at surface, OK. 21:00 - 23:00 2.00 DRILL P PROD1 RIH with Build BHA #2. Circ. at 0.2 BPM. RIH at tag bottom at 10,199'. Added 2 ft to CTD. 23:00 - 00:00 1.00 DRILL P PROD1 Drill build section, 2.7 bpm, 2800-3200 psi, 30 fph, 5R TF, 2K WOB. Drilled to 10,220'. 1/23/2007 00:00 - 02:00 2.00 DRILL P PROD1 Drill build section, 2.7 bpm, 2800-3200 psi, 60 R, 2K WOB, 60 fph, Drilled to 10,300'. 02:00 - 02:15 0.25 DRILL P PROD1 Wiper trip up to window. Clean hole. Pull up to 9500' for RA Printed: 2/12/2007 10:13:51 AM BP EXPLORATION Operations Summary Report Page 3 of 16 ~ Legal Well Name: G-24 Q '',Common Well Name: G-24 ,~ Spud Date: 12/5/1986 Event Name: REENTER+COMPLETE Start: 1/20/2007 End: 2/10/2007 Contractor Name: NORDIC CALISTA Rig Release: 2/10/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code ~ NPT Phase Description of Operations 1/23/2007 02:00 - 02:15 0.25 DRILL P PROD1 tie-in to original hole. 02:15 - 04:30 2.25 DRILL P PROD1 Log down at 150 fph from 9515'. Log down across RA. Added 1 tt to CTD and RA tag depth. RA tied-in depth is 10,190'. Top of Whipstock and window are at 10,181'. Bottom of window at 10,192. Held spill drill with crew. 04:30 - 06:30 2.00 DRILL P PROD1 Drill build section, 2.6 bpm, 2800-3300 psi, 55-75 R, 3K WOB, 30 fph, Drilled to 10,350'. 06:30 - 06:45 .17.50 DRILL P PROD1 Drill to 10362' with 65R TF, 2.79/2.79bpm, 2850/3100psi, 1.5k DWOB & 40fph ave ROP. 06:45 - 08:45 2.00 DRILL P PROD1 Drill to 10391' with 30R TF, 2.79/2.79bpm, 2850/3050psi, 2k DWOB & 15fph ave ROP. 08:45 - 10:15 1.50 DRILL P PROD1 Drill to 10418' with 60R TF, 2.75/2.75bpm, 2850/3000psi, 1.5k DWOB & 5ph ave ROP. Observe temp drilling break @ 10418'. Up wt = 38k, Down wt = 25k, IAP = 670psi, OAP = 280psi, PVT = 318bb1s. 10:15 - 11:40 1.42 DRILL P PROD1 Drill to 10445' with 60-65R TF, 2.80/2.80bpm, 2850/3050psi, 1.5k DWOB & 20fph ave ROP. 11:40 - 11:55 0.25 DRILL P PROD1 Drill to 10455' with 75R TF, 2.80/2.80bpm, 2850/3250psi, 2.5k DWOB & 35fph ave ROP. 11:55 - 12:30 0.58 DRILL P PROD1 Drill to 10490' with 65-85R TF, 2.80/2.80bpm, 2950/3150psi, 1.5k DWOB & 25fph ave ROP. 12:30 - 02:00 13.50 DRILL P PROD1 Wiper trip to window while circ bottoms up. Looking for HOT indicator. No HOT. RIH. NOTE: Had fire drill at 1300 hrs. Smoke was seen on first floor of rig camp in restroom. Determined that sewer tank heater had not shut off after the sewer tank was emptied. No fire, just smoke. Heater shut off control switch had failed, so tank heater got too hot when empty. Will fix switch ASAP. The toolpusher will ensure the heater is shut down when tank is emptied again. 02:00 - 02:40 0.67 DRILL P PROD1 Drill to 10,515' with 140R TF to drop inclination to 88 deg, 2.80/2.80bpm, 2950/3150psi, 1.5k DWOB & 30fph ave ROP. 02:40 - 17:30 14.83 DRILL P PROD1 POH while circ bottoms up for GEO sample. Pull above window. Drop pump to zero. Open EDC. POH while circ thru open circ sub. Close EDC at surface. 17:30 - 19:30 2.00 DRILL P PRODi Lay out motor and adjust it to 1.2 deg bend. Checked SWS CTC set screws, found 1 loose screw, tightened it. Check MW D. 19:30 - 21:00 1.50 DRILL P PROD1 RIH to window C~ 10181. 21:00 - 21:20 0.33 DRILL P PROD1 Tie-in correction +3.5'. 21:20 - 22:00 0.67 DRILL P PROD1 Repair Hydraulic leak on HCR and BOP. 22:00 - 22:15 0.25 DRILL P PROD1 RIH tag TD G 10512. 22:15 - 00:00 1.75 DRILL P PROD1 Drill 2.72 bpm 46 ROP, ECD 9.99, 2966 psi surface, 5101 psi DH wellbore,4650 DH annular. 1/24/2007 00:00 - 03:00 3.00 DRILL P PROD1 Drill to 10660. 03:00 - 03:40 0.67 DRILL P PROD1 150' W iper. Clean trip. 03:40 - 05:45 2.08 DRILL P PROD1 Drill lateral 2.6 bpm 3149 psi. ROP 90,ECD 10.10.DH annular pressure 4700 psi, DH tubing pressure 5420 psi. Drill to 10800. Printed: 2/12/2007 10:73:51 AM '~ BP EXPLORATION Operations Summary Report Page 4 of 16 Legal Well Common W Event Nam Contractor Rig Name: Date Name: ell Name: e: Name: From - To G-24 Q G-24 ~ REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task PLET A Code E NPT Start Rig Rig Phase ~ Spud Date: 12/5/1986 : 1/20/2007 End: 2/10/2007 Release: 2/10/2007 Number: N1 Description of Operations 1/24/2007 03:40 - 05:45 2.08 DRILL P PROD1 Stacking and stalling. 05:45 - 06:30 0.75 DRILL P PROD1 Wiper trip no problems. 06:30 - 10:00 3.50 DRILL P PROD1 Drill lateral, 2.8 bpm, 3100-3800 psi, 70L, 1 K WOB, 25 fph, many stalls. Drilled to 10850'. 10:00 - 12:30 2.50 DRILL P PROD1 Drill lateral, 2.8 bpm, 3100-3800 psi, 70L, 1K WOB, 25 fph, many stalls. Add 1 % Friction reduce. ROP increased to 80 fph at 10870'. Drilled to 10,910'. 12:30 - 13:15 0.75 DRILL P PROD1 Drill lateral, 2.8 bpm, 3100-3800 psi, 40L, 1-2K WOB, 80 fph, Stacking weight. Drilled to 10,942'. 13:15 - 13:45 0.50 DRILL P PROD1 Wiper trip to window. Clean hole. 13:45 - 14:30 0.75 DRILL P PROD1 Log GR tie-in at RA tag. Add 1 ft to CTD. RIH to bottom. 14:30 - 20:00 5.50 DRILL P PROD1 Drill lateral, 2.8 bpm, 3100-3800 psi, 80L, 1-2K WOB, 70 fph, 20:00 - 21:00 1.00 DRILL P PROD1 Wiper to window. 21:00 - 22:30 1.50 DRILL P PROD1 Drilling lateral 2.6 bpm @ 3250 psi. 2800 psi FS, WOB 4200#, ROP 75, ECD 10.09, PT 291 bbls. TF 45R Inc 91.83. 22:30 - 23:15 0.75 DRILL P PROD1 Wiper to window. 2.55 bpm 2933 psi Up wt 36K 23:15 - 23:30 0.25 DRILL P PROD1 Tie-in. Correction -9.16'. 23:30 - 00:00 0.50 DRILL P PROD1 RIH .1/25/2007 00:00 - 01:30 1.50 DRILL P PROD1 Drilling lateral 2.57 bpm ~ 3215 psi. 3100 psi FS,WOB 2300 , ROP 108, TF 100E Inc 91.83. 01:30 - 02:50 1.33 DRILL P PROD1 Wiper to window. During Mud Swap. 02:50 - 06:15 3.42 DRILL P PRODi Drilling lateral 2.5 bpm ~ 3120 psi. 2700 psi FS, WOB 900#, ROP 150, ECD 10.78, PT bbls. TF 270E Inc 83, DH annular pressure 4630 psi, DH welbore pressure 5646 psi. PT= 270 bbls. Drill to 11650. 06:15 - 07:30 1.25 DRILL P PROD1 Wiper to window. Clean hole. RIH clean to bottom. 07:30 - 09:30 2.00 DRILL P PROD1 Drilling lateral 2.8 bpm ~ 3100 psi. 2900 psi FS, WOB 4-6K, ROP 40, ECD 10.1, PT 265 bbls. TF 80L Inc 91, DH annular pressure 4800 psi, DH welbore pressure 5500 psi. PT= 268 bbls. Drill to 11,735'. 09:30 - 11:20 1.83 DRILL P PROD1 Drilling lateral 2.8 bpm Ca? 3400 psi. 2900 psi FS, WOB 4-6K, ROP 100, ECD 10.1, PT 265 bbls. TF 90L, 89 incl, DH ann press 4700, DH inner press 5820, PT = 265, Drilled to 11,799'. !I 11:20 - 12:00 0.67 DRILL P PROD1 Wiper trip to window. Clean hole. 12:00 - 12:20 0.33 DRILL P PROD1 Log GR tie-in at RA tag. Add 3 ft. 12:20 - 13:40 1.33 DRILL P PROD1 RIH to bottom. Clean hole. 13:40 - 15:15 1.58 DRILL P PROD1 Drilling lateral 2.8 bpm ~ 3400 psi. 3000 psi FS, WOB 5K, ROP 30, ECD 10.3, PT 255 bbls. TF 70R, 90 incl, DH ann press 4810, DH inn press 5550 psi Drilled to 11,868'. 15:15 - 15:45 0.50 DRILL P PROD1 Drilling lateral 2.8 bpm ~ 3400 psi. 3000 psi FS, WOB 5K, ROP 30, ECD 10.3, PT 255 bbls. ', TF 95R, 92 incl, DH ann press 4800, DH inn press 5120. Overpull and stuck pipe at 11,903'. Work pipe. 15:45 - 17:30 1.75 DRILL N STUC PROD1 Work pipe. No luck. Stop pump, wait 20 min. DH Ann press fell to 3920 psi. Pull max, still stuck. Order crude. Work pipe, circ at 3 bpm, relax pressure. No Printed: 2/12/2007 10:13:51 AM i • BP EXPLORATION Page 5 of 16 Operations Summary Report Legal Well Name: G-24 ~. Common Well Name: G-24 p. Spud Date: 12/5/1986 Event Name: REENTER+COMPLETE Start: 1/20/2007 End: 2/10/2007 Contractor Name: NORDIC CALISTA Rig Release: 2/10/2007 Rig Name: NORDIC 1 Rig Number: N1 Date ' From - To ! Hours Task Code j NPT Phase Description of Operations 1/25/2007 15:45 - 17:30 1.75 DRILL N STUC PROD1 luck. 17:30 - 19:30 2.00 DRILL N STUC PROD1 Wait on crude. 19:30 - 20:06 0.60 DRILL N STUC PROD1 Circulate 20 bbl crude to bit. Spot 5 bbl out side BHA. Reel , 58.8 bbl capacity. Pull to max while pumping last 5 bbl. 20:06 - 20:21 0.25 DRILL N STUC PROD1 Allow crude to soak. Limiting soak time to 15 min due to -40 temp . 20:21 - 20:26 0.08 DRILL N STUC PROD1 Pull to max twice.Stackout. No Go. 20:26 - 20:27 0.02 DRILL N STUC PROD1 Pump 5 additional bbls. Allow crude to soak. Limiting soak time to 15 min due to -40 temp . 20:27 - 20:45 0.30 DRILL N STUC PRODi Allow crude to soak. Limiting soak time to 15 min due to -40 ~ temp .Static DH pressures 4201 annular/4338 annular. ECD 9.02. WOB 2.55 20:45 - 20:47 0.03 DRILL N STUC PROD1 Pull max. Stackout. Pull 83000 No Go 20:47 - 21:00 0.22 DRILL N STUC PROD1 Pump 5 additional bbls. 21:00 - 21:06 0.10 DRILL N STUC PROD1 Pull max. Stack out . Pull 83000 No Go 21:06 - 22:30 1.40 DRILL N STUC PROD1 Circulate crude pill out. 22:30 - 22:55 0.42 DRILL N STUC PROD1 Circulate 32 bbl crude to bit. Spot 10 bbl out side BHA. Reel 58.8 bbl capacity. 22:55 - 23:10 0.25 DRILL N STUC PROD1 Allow crude to soak. Limiting soak time to 15 min due to -40 ', temp. 23:10 - 23:13 0.05 DRILL N STUC PRODi Pull 92000. Stack out .Pull 9200 . Hold 86000# while circualting balance of crude 2.6bpm 2600 psi. Work pipe, stack out. No Go. 23:13 - 23:30 0.28 DRILL N STUC PROD1 Allow crude to soak. Limiting soak time to 15 min due to -40 temp. 23:30 - 00:00 0.50 DRILL N STUC PROD1 Pull 91000 Stack5000, Puli 90000, Hold 84000, Stack out and circulate 2.67 bpm 3200 psi. No Go Stack out and circulate. WOB 7.0 diminished to 4.4. 1/26/2007 00:00 - 01:00 1.00 DRILL N STUC PROD1 Continue to circulate with weight stacked out. Seeing 1 K variations in WOB sub. No Go. 01:00 - 01:30 0.50 DRILL N STUC PROD1 Thaw kill line. ', 01:30 - 01:40 0.17 DRILL N STUC PROD1 Pressure backside to 1500psi and rapidly bleed off thru super choke while pulling to max 93000 #. No Results. 01:40 - 03:15 1.58 DRILL N STUC PROD1 Circulating while waiting on crude oil. 03:15 - 04:00 0.75 DRILL N STUC PROD1 Thaw suction line. 04:00 - 04:30 0.50 DRILL N STUC PROD1 Pump 68 bbl crude. 58 coil vol + 10 outside. 04:30 - 05:00 0.50 DRILL N STUC PROD1 Allow crude to soak. DH tubing pressure 4020 psi, annular pressure 3959 psi. 05:00 - 05:10 0.17 DRILL N STUC PROD1 Pull to 91 K ,Stack out. Re-pull. No Go. 05:10 - 06:30 1.33 DRILL N STUC PROD1 Wait on Mud for swap. No Vac trucks available. 06:30 - 07:30 1.00 DRILL P PROD1 Pull 85K. Set brake. Pulled free after a few seconds. Wiper j trip to window. Normal up wt. I~ All tools working. Circ. out crude. Send crude returns to tiger tank. 07:30 - 08:00 0.50 DRILL P PROD1 Log GR tie-in at RA tag, -4 ft CTD. 08:00 - 10:30 2.50 DRILL P PROD1 RIH clean to 11,100'. Ream shales from 11,100-11,200'. Ream up and down several times at 10 fpm. 10:30 - 13:30 3.00 DRILL P PROD1 RIH and ream shales from 1 1 550-1 1 850'. Back ream up to 11550'. Ream down. Swap well to new FloPro while reaming down the last time. New FloPro has 4% LoTorq and 12 # KlayGard. 13:30 - 14:15 0.75 DRILL P PROD1 Drill Z2A Lateral, 2.6 bpm, 2800-3200 psi, 80R TF, 92 deg incl, 9.9 ECD, 5160 inner press, 4580 Ann press. Printed: 2/12/2007 10:13:51 AM • ~ BP EXPLORATION Page 6 of 16 Operations Summary Report Legal Well Name: G-24 ~ Common Well Name: G-24 ~ Spud Date: 12/5/1986 'Event Name: REENTER+COMPLETE Start: 1/20/2007 End: 2/10/2007 ,Contractor Name: NORDIC CALISTA Rig Release: 2/10/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase tion of Operations Descri p 1/26/2007 13:30 - 14:15 0.75 DRILL P PROD1 Drilled to 11989' 14:15 - 14:30 0.25 DRILL P PROD1 Wiper trip up to 11,850'. Clean hole. RIH clean to bottom. ', 14:30 - 15:00 0.50 DRILL P PROD1 Drill Z2A Lateral, 2.6 bpm, 2800-3200 psi, 80R TF, 92 deg 15:00 - 16:00 I 1.001 DRILL I P I (PROD1 16:00 - 16:15 0.25 DRILL P PROD1 16:15 - 18:15 2.00 DRILL P PROD1 18:15 - 20:00 I 1.751 DRILL I P I I PROD1 20:00 - 21:45 I 1.751 DRILL I P I I PROD1 21:45 - 22:50 I 1.081 DRILL I P I I PROD1 22:50 - 23:15 0.42 DRILL P PROD1 23:15 - 00:00 0.75 DRILL P PROD1 11/27/2007 (00:00 - 05:15 I 5.251 DRILL I P I I PROD1 05:15 - 07:00 I 1.751 DRILL I P I I PROD1 07:00 - 07:15 I 0.251 DRILL I N I DPRB I PROD1 07:15 - 07:45 0.501 DRILL N DPRB PRODi 07:45 - 08:00 0.25 DRILL N DPRB PROD1 08:00 - 10:00 2.00 DRILL N DPRB PROD1 10:00 - 11:40 I 1.671 DRILL I N I DPRB I PROD1 11:40 - 12:00 I 0.331 DRILL I N I DPRB I PROD1 12:00 - 13:30 ~ 1.50 ~ DRILL ~ N ~ DPRB ~ PROD1 incl, 9.9 ECD, 5160 inner press, 4580 Ann press. Drilled to 12,050'. Wiper trip to window. 20-30K overpulls in shales from 11,200-1 1 1 00', Lower shales at 11500-800' were OK. Log GR tie-in. Add 2 ft CTD. RIH and ream shales from 11,100-11,200' at 5 fpm. RIH and ream shales from 11,500-11800' at 5 fpm. Drill Z2A Lateral, 2.7 bpm, 3100 psi,2930 psi FS, 100E TF, 270 deg incl, 10.07 ECD, 5100 inner press, 4680 Ann press. Wiper to window Back ream @ 11560 motor work and over pull. Continue to 11200 . UP Wt 37K, 1 1 269-1 1 250 work thru,Wt 11150- 11140 - 11100. POH to 10150'. Pull thru window pull heavy 48K. Return rate increasing look like cutting bed moving Up hole. Pulled above to function test EDC. During the stuck pipe incident the EDC seen 22K which exceed recommended operating limit of 14K. OPEN EDC and circulate at 3 bpm @ 2760 psi. bottom up from window.After 155 bbl cleaned up annular vol 118 bbl. Lots of cow pies. Close EDC OK. Log tie-in. correction + 2.2' Continue with wiper. RIH to 2.63 bpm @ 2900 psi. Dn Wt 21 K set down at 11161. Adjust tool face. work to 11169. Continue to work to bottom .Set down at 11,162. Work thru. 11,179. FS 2900 psi. Reaming at 3780 psi holding TF as origionally drilled. Work to 11215 Back ream to 11.100. ,Over pull 11,169 RIH to 11,215. Pressure up losing returns. Continue to work thru. Ream with same TF as hole was drilled. Tried to RIH with minimum pump. Stacking wt. Reamed down to 11320', appear to be sidetracked, fast drilling at 220 fph, clean sand. Ordered 9.5 PPG FloPro to help fight shales. MI plant is busy making FloPro for Nordic 2. Slow delivery for Nordic 1. Drilled to 11,350'. Not reaming. We are sidetracked. Best guess for sidetrack depth is 11,160' in 14N shale. Started stacking wt at that depth while reaming 14N shale. Wiper trip to window. Pulled thru 14N shale with just 1 overpull. Clean trip to window. Log GR tie-in. Add 1.5' CTD. RIH. Went thru 14N shale clean. Log down at 150 fph to get directional surveys while RIH. Clean hole to bottom. Drill Z2A lateral. 2.7 bpm, 2900-3400 psi, 110L, 1K WOB, 110 fph, 10.1 ECD, 5200 inn press, 4720 ann press. Drilled to 11460 ft. Drill Z2A lateral. 2.7 bpm, 2900-3400 psi, 110L, 1 K WOB, 90 fph, 10.1 ECD, 5200 inn press, 4720 ann press. Drilled to 11,500'. Wiper trip to window. Clean hole to window. RIH. Clean trip to Printed: 2/12/2007 10:13:51 AM ~ ~ BP EXPLORATION Operations Summary Report Page 7 of 16 ~ Legal Well Name: G-24 ~ Common Well Name: G-24 ~ Spud Date: 12/5/1986 Event Name: REENTER+COMPLETE Start: 1/20/2007 End: 2/10/2007 Contractor Name: NORDIC CALISTA Rig Release: 2/10/2007 Rig Name: NORDIC 1 Rig Number: N1 Date 'From - To Hours Task Code NPT Phase Description of Operations 1/27/2007 12:00 - 13:30 1.50 DRILL N DPRB PROD1 bottom. 13:30 - 14:20 0.83 DRILL N DPRB PROD1 Drill Z2A lateral. 2.7 bpm, 3000-3400 psi, 70L, 88.3 deg incl, 14:20 - 15:00 0.671 DRILL N DPRB PROD1 15:00 - 16:30 I 1.501 DRILL I N I DPRB I PROD1 16:30 - 17:30 1.001 DRILL N DPRB PROD1 17:30 - 18:00 0.50 DRILL N DPRB PROD1 18:00 - 19:00 1.00 DRILL N DPRB PROD1 19:00 - 19:15 0.25 DRILL N DPRB PROD1 19:15 - 20:00 0.75 DRILL N DPRB PROD1 20:00 - 21:45 1.751 DRILL I N I DPRB I PROD1 21:45 - 22:45 1.00 DRILL N DPRB PROD1 22:45 - 23:15 0.50 DRILL N DPRB PROD1 23:15 - 00:00 0.75 DRILL N DPRB PROD1 1/28/2007 00:00 - 01:30 1.50 DRILL N DPRB PROD1 01:30 - 03:15 1.75 DRILL N DPRB PROD1 03:15 - 04:25 1.17 DRILL N DPRB PROD1 04:25 - 04:40 0.251 DRILL I N I DPRB I PROD1 04:40 - 05:50 I 1.171 DRILL I P I I PRODi 05:50 - 07:10 1.33 DRILL P PROD1 07:10 - 07:30 0.33 DRILL P PROD1 07:30 - 08:30 1.00 DRILL P PROD1 08:30 - 10:00 1.50 DRILL P PROD1 10:00 - 11:10 I 1.171 DRILL I P 11:10 - 11:30 I 0.331 DRILL I P PROD1 PROD1 1 K W OB, 120 fph, 10.1 ECD, 5400 inn press, 4750 ann press. Drilled to 11,590'. Drill Z2A lateral. 2.7 bpm, 3100-3800 psi, 90L, 90 deg incl, 1K WOB, 120 fph, 10.2 ECD, 5200 inn press, 4750 ann press. Drilled to 11650'. Wiper trip to window. Clean hole to window. RIH. Clean trip to bottom. 14N shale is looking good so far. Drill Z2A lateral. 2.7 bpm, 3100-3800 psi, 80L, 90 deg incl, 1 K WOB, 120 fph, 10.2 ECD, 5780 inner press, 4770 ann press. Drilled to 11,750'. Drill Z2A lateral. 2.7 bpm, 3100-3800 psi, 90R, 91 deg incl, 1K WOB, 110 fph, 10.4 ECD, 5580 DH inner press, 4850 ann press. Drilled to 11,800' Wiper trip to window. Log tie-in. Correction +2.6'. Wiper RIH to 11167 set down Pop thru. backream 11180 - 11150. RIH tag at 11794. PT 181bb1s. Directionally drill 2.55/2.50 bpm @ 3370 psi, FS 3050 psi,ROP 108, W06.9K, EDC 10.3 Inc 88.7, Swap to 10.0 ppg new mud will blend back to 9.5 ppg. New mud to surface. New ECD 11.6 Wiper trip to 10200. Seen motor work 11202 and 11180. Wiper back to bottom. Clean trip. Directionally drill 2.3 bpm 4300 psi, FS 3950 psi, ROP - 104,WOB 1.5K,ECD 11.8,TF 90L, Directionally drill 2.3 bpm 4300 psi, FS 3950 psi, ROP - 104,WOB 1.5K,ECD 11.8,TF 90L. W iper to window. Clean trip. Directionally drill 2.3 bpm 3850 psi, FS 3450 psi, ROP 113,W06 1.7K,ECD 11.6,TF 90L, 100' wiper. Now back to depth of previous original hole (12205' md), so stop NPT in DIMS. Directionally drill 2.3 bpm 3850 psi, FS 3450 psi, ROP - 113,W0B 1.7K,ECD 11.6,TF 90L, Ratty drilling suspected .~ fault at 11200' Wiper clean trip out of the hole Log tie-in. add 2.2 tt. RIH: 14N shale was clean. RIH clean to bottom. Drill lateral, slow drilling, hard to get wt to bit, BHA is not sliding, BHA may be across fault, stack wt and then stall motor. 2.5 bpm, 3900-4500 psi, 80L, 90 deg incl, 11.1 ECD, 5730 inner press, 5170 ann press. Drilled to 12,266'. Drill Z2A lateral, better drilling, 2.4 bpm, 3800-4300 psi, 90 deg inc1, 60L TF. 100 fph, 3 K WOB 11.6 ECD, 6100 Inner press, 5240 ann press. Drilled to 12329'. Stacking wt. 300' wiper trip. RIH clean to bottom. 15K down wt. 36K up wt. Printed: 2712/2007 10:13:51 AM BP EXPLORATION Page 8 of 16 ~ Operations Summary Report Legal Well Name: G-24 Q Common Well Name: G-24 ~ Spud Date: 12/5/1986 Event Name: REENTER+COMPLETE Start: 1/20/2007 End: 2/10/2007 Contractor Name: NORDIC CALISTA Rig Release: 2/10/2007 Rig Name: NORDIC 1 Rig Number: N1 Date ~ From - To Hours', Task ~ Code ~ NPT~ Phase Description of Operations I ~ _ -- --- - -- _ _ _ - -- -- - - 1/28/2007 11:10 - 11:30 0.33 DRILL P PROD1 11:30 - 12:30 1.00 DRILL P PROD1 Drill Z2A lateral, better drilling, 2.4 bpm, 3800-4300 psi, 90 deg incl, 80L TF. 90 fph, 3 K WOB. 11.5 ECD, 5750 inner press, 5370 ann press. Stacking wt. Drilled to 12,376'. 12:30 - 15:00 2.50 DRILL P PROD1 Wiper trip to window. Clean hole. RIH clean to bottom. 15:00 - 15:20 0.33 DRILL P PROD1 Try to drill, bit looks worn out, stacking wt. very little motor work. 2.5 bpm, 3800-4100 psi, 2-3K WOB. Slow drilling. 15:20 - 18:30 I 3.171 DRILL I P I I PROD1 18:30 - 18:50 0.33 DRILL P PROD1 18:50 - 20:30 1.67 DRILL P PROD1 20:30 - 23:15 2.75 DRILL P PROD1 23:15 - 00:00 0.75 DRILL P PROD1 ,1/29/2007 00:00 - 01:00 1.00 DRILL P PROD1 01:00 - 03:00 2.00 CASE N SFAL PRODi 03:00 - 06:30 3.50 CASE N SFAL PROD1 06:30 - 07:30 1.00 CASE N SFAL PROD1 07:30 - 09:30 2.00 CASE N SFAL PROD1 09:30 - 13:00 3.50 CASE N SFAL PROD1 13:00 - 15:00 2.00 CASE N SFAL PROD1 15:00 - 16:00 1.00 CASE N SFAL PROD1 16:00 - 16:15 0.25 CASE N SFAL PROD1 16:15 - 21:00 4.75 CASE N SFAL PROD1 21:00 - 00:00 3.00 CASE N SFAL PROD1 1/30/2007 00:00 - 04:00 4.00 CASE N SFAL PROD1 ~I 04:00 - 06:30 2.50 CASE P PROD1 06:30 - 06:45 0.25 CASE P PROD1 06:45 - 08:30 ~ 1.75 ~ CASE ~ P ~ ~ PROD1 08:30 - 10:30 I 2.001 CASE I P I I PROD1 10:30 - 11:30 1.00 CASE P PROD1 11:30 - 14:30 3.00 CASE P PROD1 GEO called well at TD. We have plenty of good sand to perforate. Not worth risk of bit trip to drill last 150'. ~ Log RES/GR from TD to window. 750 FPH. 2,5 bpm, 3850 psi, clean hole. Log GR tie-in, added 3.7 ft to CTD. RIH to tag TD. 12382. POH lay in 100 bbl liner running pill. Stand back injector. Blow down BHA. LD BHA. Bit 3-8. Wear pad on motor wore away. PJSM for running liner. We have two green hands and new tong. Discussed risks. PU first joint MU float shoe MU with little jerks. Attempt to MU second joint with Eckles. Criushed top joint #1. Regrouped held secong PJSM. discussed risk and proper use of tongs. Discussed "Line of fire" with new hand and latching techniques for latching elevators. PU liner. M/U 40 jts of 2-7/8" STL Liner. PJSM for running liner. Review how to us new Eckle power tongs, discuss hazards and mitigation for running liner. RIH with 2-7/8" liner. Over torqued one connection. Check operation of power tongs. Lay out 2 joints. R/U bowl and hand slips to run 1-1/4" CSH to drift 2-7/8" liner with 2.30" drift. Move liner in pipe shed to access the 1-1/4" liner. RIH with 1-1/4" CSH .Stack out at jt 20. POH with CSH. PJSM for POH with 2-7-8 STL liner POH with 2-7-8 STL liner to landing collar. RU Farr tongs. Drift pin end of liner laid down and clear 2-7/8 from pipe shed. Load pipe shed. Drift and tally pipe. Continue to load pipe shed. Drift and tally pipe. Run liner drifting each connection with 2.35" drift on 1-1/4 CSH. SAFETY MEETING. Review procedure, hazards and mitigation for make up and run liner. Run 2-7/8", STL liner. Torque each connection to 1500 ft-Ibs and drift each connection with 2.35" drift. All joints of 2-7/8" liner drifted OK with 2.375" drift. Run LSL XO sub and 3-3/16" liner, XO, 3-1/2" Liner, X nipple and BOT Deployment Sleeve with Pump off GS spear. M/U BHI BHA to run liner. BHA OAL = 2452.15'. RIH with liner, circ. at 0.5 bpm to fill coil. Run thru window ~ 13:30hrs. Set down 11144. Pop thru. Set down 12216. PU and run bounce thru. Set down ~ 12248,12280,12328,12342X3 Tag correct to 12383. PU wt 38K. Stack 13K on Liner. Circulate at 1.6 bpm at 3360 psi. PU Wt 30K Printed: 2/12/2007 10:13:51 AM • s BP EXPLORATION Page 9 of 16 ~ Operations Summary Report Legal Well Name: G-24 Common Well Name: G-24 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA 'Rig Name: NORDIC 1 Date From - To Hours ~ Task Code ~ NPT - -- ~ 1/30/2007 14:30 - 16:30 2.00 CASE P 16:30 - 18:00 1.50 CASE P 18:00 - 20:00 2.00 CASE P 20:00 - 22:30 I 2.501 CASE I P 22:30 - 00:00 1.50 CASE P 1/31/2007 00:00 - 02:00 2.00 CASE P 02:00 - 03:30 0.00 CASE P 03:30 - 04:30 1.00 CASE P 04:30 - 06:00 1.50 CASE P 06:00 - 09:00 I 3.001 CASE I P 09:00 - 11:15 I 2.251 CASE I P 11:15 - 12:30 1.25 CASE P 12:30 - 13:30 1.00 CASE P Spud Date: 12/5/1986 Start: 1 /20/2007 End: 2/10/2007 Rig Release: 2/10/2007 Rig Number: N1 Phase Description of Operations PROD1 POH. PROD1 LD BHA. PROD1 Circ while r/d bad micro motion from reel house manifold, r/u N2 unit PROD1 PJSM. P/T Lines to 2500 psi, Pump 5 bbl McOH in coil. Displace with N2 to tiger tank, 1500 CFM for 12 min. Bleed down coil press. RD hardline PROD1 PJSM, M/U internal CTC. Pull test. Pull coil stub to reel. PROD1 Secure coil on reel with chains and crossbar. PROD1 PJSM, Load out E-coil reel, moved to C-pad PROD1 Cleared snow drifts to establish path for CT reel trailer PROD1 PJSM, Move in, spot reel, PU CT reel, PJSM, M/U internal CTC PROD1 PJSM, M/U internal CTC, Pull test, Pull coil to reel. Install coil connector. Pull test 35K. PROD1 Fill coil. Pump volume dart. 2.11 bpm @ 100 psi. initial ,2.27 bpm .Dart volume 60.5 bbl stroke counter 57.1 Micro motion. PROD1 RIH pumping min rate. PROD1 Continue to RIH. Postpone planned cementing operation wait weather. Drifting snow and poor visiblity preventing spot Vac trucks safely. Continue to RIH to window. 13:30 - 00:00 10.50 CASE N WAIT PROD1 Circulate at 9512'..33 bpm C~? 1350 psi. Wait on weather. GPB is in Phase 2 on main roads, level 3 on access roads and pads, G-pad is drifted in w/ 2 to 3' of snow through out pad and surrounding rig and equipment 2/1/2007 00:00 - 02:30 2.50 CASE N WAIT PROD1 Circulate at 9512' w/ .39 bpm @ 1325 psi. Wait on weather. 02:30 - 08:15 5.75 CASE N WAIT PROD? 08:15 - 08:20 0.08 CASE N WAIT PROD1 08:20 - 09:30 1.17 CASE P PROD1 09:30 - 13:00 3.50 CASE P PROD1 13:00 - 15:20 2.33 CEMT P PROD1 15:20 - 17:45 2.42 CEMT P PROD1 17:45 - 18:30 0.75 CEMT P PROD1 18:30 - 19:30 1.00 EVAL P LOWERI GPB is in Phase 2 on main roads, level 3 on access roads and pads, G-pad is drifted in w/ 2 to 3' of snow through out pad and surrounding rig and equipment Circulate at 9512' w/ .39 bpm @ 1325 psi. Wait on weather. GPB is in Level 2 on main roads, level 3 on access roads and pads, Waiting on roads and pads, place call to roads and pads to have snow removed from access roads and pad leading into location ASAP, we are on the list, forklift clearing location Received IMT approval to proceed with operations via Alan Graft RIH stab into tie back sleeve. Seen 400 psi pressure increase and lost 9K wt. PU and to neutral wt and reland. Clean suck down pit level. Swap to KCL.2.74 bpm at 3300 psi. Mix Bio pill. Batch mix 33 bbls cement. Cement at wt @ 25 PT to 4000 psi, Pump 31 bbl @ 2.3 bpm C~ 2500 psi. Close inner reel valve. Install dart and launch with 1500 psi. Confirm that dart Iaunched.14:30hrs Displace with 28 bbls Bio. Followed by KCL. Zero out Mirco as cement hits shoe. PU liner wiper plug with 62.2 bbls. ~ 3400psi. Bumped plug 78.9 bbl. This was 1.7 bbl late due to micro motion calibration issue. Check floats. OK. Pressure to 1000 psi and unsting from liner. Contaminate with bio . Cement in returns. No loss observed. POH LD BHA. clear and clean floor R/U floor for running loging/cleanout BHA. Initialize & test logging tools. P/U tools to rig floor. Printed: 2/12/2007 10:13:51 AM ~ ~ BP EXPLORATION Page 10 of 16 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date 'I Name: ell Name: e: Name: From - To II G-24 G-24 {~ REENTE NORDIC NORDIC Hours . R+COM CALIST 1 Task ; i PLET A Code ~ E NPT j Start Rig Rig Phase ~ Spud Date: 12/5/1986 : 1/20!2007 End: 2/10/2007 Release: 2/10/2007 Number: N1 Description of Operations ___ 2/1/2007 19:30 - 19:45 0.25 EVAL _ _ _ P _ - LOWERI _ - _ _ PJSM on P/U &RIH MCNL tools & 1-1/4" CHS tbg. 19:45 - 00:00 4.25 EVAL P LOWERI P/U logging/cleanout BHA #5 with 2.30" D331 mill, 2-1/8" straight motor, XO, 2jts of 1-1/4" CSH tbg, X-O, MCNUCCUGR logging tool carrier, lower MHA, 78jts of 1-1/4" CSH tbg, XO & upper MHA. M/U Injector. Confirmed UCA cement test of 500 psi compressive strength. 2/2/2007 00:00 - 01:30 1.50 EVAL P LOW ER1 RIH w/ logging/cleanout BHA #5 to 9000' 01:30 - 03:30 2.00 EVAL P LOW ER1 Cleanout wellbore ~ 1 bpm, 970 psi, log down MCNUCCUGR C~3 30fpm from 9000'. Reciprocate 2x across LSL sub C2 1.5bpm. Log down to 12338', tagged 2x @ 12338', correct depth to 12348' PBTD. 03:30 - 04:45 1.25 EVAL P LOWERI Log up ~ 60fpm from PBTD to 9000' while laying-in 150kcps perf pill in liner, flag EOP at 9727, 100' from PBTD, found existing flag at 234' from PBTD or EOP of 9592' ~ 04:45 - 06:00 1.25 EVAL P LOWERI POH to BHA 06:00 - 06:15 0.25 EVAL P LOWERI PJSM on handling MCNL BHA,RU, POH w/ BHA, std back 1- 1/4" CSH, LD logging tools 06:15 - 09:00 2.75 EVAL P LOW ER1 Stand back hydril tubing and LD logging tools. Injury SLB employee fractured RH Pinky finger. He released the elevators prematurely joint bounced off cat walk. His finger got caught between elevator and box end of tubing. 09:00 - 10:30 1.50 EVAL P LOW ER1 PU injector and swizel stick and flush stack. 10:30 - 11:00 0.50 EVAL P LOWERI PJSM on RU Little Red to fluid pack IA and PT liner and lap 11:00 - 12:00 1.00 EVAL P LOWERI PT Little Red. Fill back side with 7 bbl dead crude. Pressure IA to 1000 psi. 12:00 - 12:15 0.25 EVAL P LOWERI Attempt to test finer lap to 2000 psi. Bleed down to 1500 psi in 5min. Test Failed. Re pressure bleed off look ike may stabalize 1400 - 1300 psi. 12:15 - 13:30 1.25 EVAL P LOWERI RD Little Red 13:30 - 13:40 0.17 PERFO P LOWERI PJSM for PU guns. 13:40 - 17:40 4.00 PERFO P LOW ER1 PU 88 2" 6SPF 2006PJ Perf Guns and 2" blank guns, Perf Gun's OAL 1855' 17:40 - 19:00 1.33 PERFO P LOW ER1 PU 10 stands of CSH tubing, MU MHA, PU injector, fax CNL log to ANC Geo. ANC Geo OKs preliminary perf picks. PBTD = 12348' & TOL = 9963'. 19:00 - 21:30 2.50 PERFO P LOWERI RIH with perforating BHA #6, circ 15bbls of perf pill ahead min rate. Correct -38' @ the flag. Wt check @ 12150' - Up wt = 41.5k & Run-in wt = 22.7k. Tag PBTD 3x ~ 12330'. P( BTD as per MCNL12338'l. R/U sonogram detector to choke manifold for shot detection. 21:30 - 22:10 0.67 PERFO P LOW ER1 Load & launch 5/8" AL ball. Pull to P/U wt, Pump 15bbls of perf pill behind & chase ball C 2.02bpm/2000psi. Slow to 1.09bpm/875psi ~ 40bbls. Ball on seat after 61.4bbls away. Pressured up to 2800psi, guns fired w/ good surface indication and sonogram detection. PPrforat d intarval~ 7n~nn~ - i1 oAn, 115 0' - 117.rn'. Z19$n,~.~?OQ' & 12260' -,],2,,30'_ 22:10 - 23:15 1.08 PERFO P LOW ER1 POOH with perf gun BHA ~ 50fpm, Circ ~ 1.4bpm & 875psi. Lost a total of 2bbls while POOH to TOL. 23:15 - 23:30 0.25 PERFO P LOW ER1 S/D pump &flowcheck well for 15 mins -well stable. 23:30 - 00:00 0.50 PERFO P LOW ER1 POOH with perf gun BHA @ 50fpm, circ C 1.46bpm & 1020psi 2/3/2007 00:00 - 00:45 0.75 PERFO P LOWERI POOH to BHA @ 93fpm, circ @ 1.46bpm & 1020psi 00:45 - 01:15 0.50 PERFO P LOW ER1 S/D pump &flowcheck well for 30 mins -well stable. PJSM for R/B 1-1/4" CSH. Printed: 2/122007 70:13:51 AM BP EXPLORATION Page 11 of 16 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: ate - ~ Name: ell Name: e: Name: rom - To , ___ ~ _' G-24 G-24 Q REENTE NORDIC NORDIC ours I .- R+COM CALIST 1 Task ~ PLET A Code E PT ( i I Start Rig Rig Phase _ Spud Date: 12/5/1986 : 1/20/2007 End: 2/10/2007 Release: 2/10/2007 Number: N1 Description of Operations ___ _ __ 2/3/2007 01:15 - 02:15 1.00 - PERFO _ P - _ __ _ _ LOWERI S/B injector. UD MHAs & R/B 10 stands of 1-1/4" CSH. 02:15 - 02:45 0.50 PERFO P LOWERI R/U to UD perf guns, PJSM for LD perf guns. 02:45 - 09:00 6.25 PERFO P LOW ER1 UD 88 jts of perf guns & blanks. ASF 09:00 - 10:30 1.50 PERFO P LOW ER1 Clear floor. Bundle and load out spent guns. 10:30 - 15:30 5.00 PERFO N WAIT LOW ER1 Wait on reshippment of 2 jts of 2-3/8 PH6. First order incorrect. 15:30 - 00:00 8.50 BOPSU P LOW ER1 Unlikely to complete well before BOP deadline 24:OOhr due to equipment delay. Decide to test BOP to avoid possible violation. greased and tested choke manifold valves and BOPs as per AOGCC Regulations. AOGCC Jeff Jones waived witnessing test. 2/4/2007 00:00 - 01:00 1.00 BOPSU P LOW ER1 Finished testing BOPs as per AOGCC Regulations 01:00 - 01:45 0.75 EVAL P LOW ER1 R/U to run LTP. P/U tools into rig floor, Held PJSM for M/U & RIH LTP, M/U BHA #7 with Bkr seal assy, KB Packer, GH R/Tool, 2 jts of PH6 tbg & MHA. M/U injector. 01:45 - 05:00 3.25 EVAL P LOWERI RIH w/ LTP Assy to 9900', est Up Wt 37.3k, Dn Wt 24.5k, slow circ rate to .61 bpm, 117 psi, RIH tagged deployment sleeve, ', pump pressure increased to 200psi, shut down pumps, bled off pressure continued to slack off w/ 10k down wt, top of LTP at 9958' 05:00 - 06:15 1.25 EVAL P LOW ER1 Drop 5/8" steel ball, Poh, unstung from deployment sleeve, Displace ball with 8.5 ppg brine at 1.7bpm, 586psi, slowed pumps to .58 bpm, 103psi, after pumping 30 bbls, stung in to deployment sleeve, pressure increased to 200 psi, shut down pumps, bled pressure off to 0 psi, continued S/O with 6' of seal with 10k down wt, PU to Up Wt, allowed ball to free fall, Pressure Up on IA w/ 1000 psi w/ pump truck, attempt to pressure up on ball, not on seat, circ ball down getting full returns at surface 06:15 - 06:25 0.17 EVAL P LOWERI Shut down pumps, PUH 200', UP Wt at 34.8k, 2.5k difference ', from original Up Wt, ~I 06:25 - 06:35 0.17 EVAL P LOW ERi RIH w/ pumps at .57bpm, 100psi, pressure increased to 200psi, shut down pumps, bled off pressure, continue slacking off 6' then set down 10k 06:35 - 06:50 0.25 EVAL P LOW ER1 Circ at .50 bpm , 95psi, full returns at surface, s/o additional 5k with full returns at surface, PU to PU wt, surged pumps several times with no success. 06:50 - 08:55 2.08 EVAL P LOW ER1 Circ second CT volume at 1.75 - 2.04bpm w/ 1025 - 1388psi, ball on seat w/ 90.7 bbls pumped, pressure up to 2090psi, no returns at surface, stack down 10k C~2 9924.8. PU 35K to 9920.2 Side down 9925 OK. Set 10K. Pu to 9919. Pressue coil to 2000. RIH stack 10k @ 9924. Isolate CT with 1640 psi. Pump down ct annulus 2000 psi 2 3.2 bbl. SD and presure bleed of to 300 psi in 2min, Injecting 1.75 bpm C~? 2000 psi. PT 194 bbl. TRY again. PU 32K to 9918. Pump in ct at 2250 psi. 29K string wt. RIH so 10K ~ 9924. Inject down ct annulus 2 bpm. Bleed off. PU to 9917 , PT 177 bbl, Pumped down ct 2500 psi. SO 10K, ~ 9924.4, Bleed down, PU 9924.4 with 37k to 9918.6, Pu to 9916. Pump down CT 2700 psi. RIH SO 10K at 9924.3. PU to 9917. Pump down ct 3600 psi shear release packer. Set down 9925.7 Circulate coil. Pump down backside injecting into annulus. 08:55-10:45 1.83 FISH N DFAL LOWERi POH 10:45 - 12:00 1.25 FISH N DFAL LOW ER1 LD running tool. PT coil connector. Printed: 2/12/2007 10:13:51 AM BP EXPLORATION Page 12 of 16 ~ Operations Summary Report Legal Well Name: G-24 Common Well Name: G-24 Spud Date: 12/5/1986 Event Name: REENT R+COMPLETE Start: 1/20/2007 End: 2/10/2007 Contractor Name: NORDIC CALISTA Rig Release: 2/10/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From - To i Hours Task !Code NPT Phase Description of Operations 2/4/2007 12:00 - 12:15 0.25 FISH 12:15 - 14:00 1.75 FISH 14:00 - 14:15 0.25 FISH 14:15 - 16:30 2.25 FISH 16:30 - 16:45 0.25 FISH 16:45 - 19:30 2.75 EVAL 19:30 - 20:00 0.50 EVAL 20:00 - 22:15 2.25 EVAL 22:15 - 23:00 0.75 EVAL 23:00 - 00:00 1.00 EVAL 2/5/2007 00:00 - 02:00 2.00 EVAL 02:00 - 04:15 2.25 EVAL 04:15 - 04:30 0.25 EVAL 04:30 - 05:00 0.50 EVAL 12/6/2007 05:00 - 08:00 08:00 - 14:00 14:00 - 17:00 17:00 - 17:30 17:30 - 17:45 17:45 - 18:30 18:30 - 20:00 20:00 - 20:30 20:30 - 22:45 22:45 - 00:00 00:00 - 00:15 00:15 - 01:00 01:00 - 01:15 01:15 - 02:00 02:00 - 03:45 03:45 - 05:30 05:30 - 07:30 07:30 - 10:00 3.001 EVAL 6.00 EVAL 3.00 EVAL 0.50 EVAL 0.25 EVAL 0.75 EVAL 1.50 EVAL 0.50 EVAL 2.25 EVAL 1.25 EVAL 0.25 EVAL 0.75 EVAL 0.25 EVAL 0.75 EVAL 1.75 EVAL 1.75 EVAL 2.00 EVAL 2.50 EVAL N DFAL LOWERI MU fishing BHA. N DFAL LOWERi RIH at min rate. N DFAL LOW ER1 Latch packer. PU no over pull. Stab back into liner and saw 300 psi pressure increase. N DFAL LOWERI POH N DFAL LOW ER1 LD KB Packer. shear screws sheared and packer started to set. Thick black goo evident maybe the cause of failure will sent to Baker shop for tear down. N DFAL LOWERI Consult with slope PE's on plan forward, recommend 60 bbl hot deisel flush to combat pariffin/ asphaltine in wellbore, Waiting on pump truck N DFAL LOWERI MU Cleanout BHA # 9 with nozzle, x-o, hyd disconnect, ck valve, x-o, 2 jts of 2 3/8" PH6, CTC, stab inj. OAL 72.23' N DFAL LOW ER1 RIH w/ BHA tag at 9912', flag EOP at 9840' and 9820', up wt 38k, do wt 23k, 2.76bpm, 1743psi N DFAL LOW ER1 Circ at 2.6bpm, 1450 psi reciprocate CT from 9912' to 9800' while waiting on pump truck N DFAL LOW ER1 PJSM w/ Hot Oil Crew, Spot and RU pump truck N DFAL LOW ER1 Pressure test lines to 2000 psi, Pump 60 bbls of diesel heated to 160 degree on the fly at .5 - 1.5bpm, 850 - 1200psi, switch to rig pump, pump KCL water at 2.4bpm, 2150psi N DFAL LOWERI POH to BHA, circ hole clean N DFAL LOWERI POH , LD cleanout BHA #9 N DFAL LOWERI R/U to run LTP. P/U tools into rig floor, Held PJSM for M/U & RIH LTP, M/U BHA #7 with Bkr seal assy, KB Packer, GH R/Tool, 2 jts of PH6 tbg &MHA. M/U injector. N DFAL LOWERI RIH w/ LTP Assy. Sting into liner with 200 psi circulation prssure witnessed pressure increase X9917' .Set down and 9924 stack 10K to 9924.3. PU to neutral weight and PU 3'. Circuate with returns ~ 1 bpm with 400 psi thru top perforations. N DFAL LOW ER1 Wait on orders. N DFAL LOWERi POH to LTP BHA per instruction from Anchorage. N DFAL LOWERI POH, LD LTP BHA N DFAL LOWERI PJSM on handling logging tools, PU, MU SCMT logging BHA N DFAL LOWERI Wait on Ported X-O Sub - 3/4' SR box x 1.5" MT box ported N DFAL LOWERI MU ported X-O sub, lower MHA, 40 stds of 1 1/4" CS Hyd, upper MHA, CTC, stab inj N DFAL LOWERI SLB logging encoder not working, changed out with replacement N DFAL LOWERI RIH w/ SCMT Logging Tool Assy, tagged up at 9942', RIH to 12300', no other problems N DFAL LOW ER1 Log up at 30 fpm from 12300' to 10000' / N DFAL LOW ER1 Finished Logging up to 9600' N DFAL LOW ER1 RIH to 10538', set down, unable to work pass after several attempts N DFAL LOW ER1 POH above liner at 9963' to 9800', no problems N DFAL LOW ER1 RIH to 12300', no problems going through liner top at 9963' and 10538', ok, had additional down drag at 10700' and 11770' N DFAL LOW ER1 Log up at 30fpm f/ 12300' to 9600' i N DFAL LOWERI POH to SCMT BHA N DFAL LOWERI POH w/ BHA, LD SCMT Logging Assy Missing one bow spring N DFAL LOW ER1 Review plan with Anchorage Office, Wait on Baker Tools Printed: 2/12/2007 10:13:51 AM ~ ~ BP EXPLORATION Page 13 of 16 Operations Summary Report Legal Well Name: G-24 Common Well Name: G-24 }~, Spud Date: 12/5/1986 Event Name: REENTER+COMPLETE Start: 1/20/2007 End: 2/10/2007 Contractor Name: NORDIC CALISTA Rig Release: 2/10/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code ~ NPT Phase Description of Operations 2/6/2007 10:00 - 10:15 0.25 EVAL N DFAL LOW ER1 PJSM on handling and PU tools for cleanout run 10:15 - 12:45 2.50 EVAL N DFAL LOW ER1 MU cleanout BHA #12 w/ 2.63" OD Venturi Basket, Circ Sub, Lower MHA, 22 Jts of 1 /14" CSH, upper MHA, NRJ, CTC, stab inj - OAL = 707.10' note: discrepency on the number of stands of 1 1/4" CSH RIH, POH and reran 11 stds. 12:45 - 14:30 1.75 EVAL N DFAL LOW ER1 RIH to 9938', tag top of liner, attempt to work pass several times, failed. 14:30 - 17:15 2.75 EVAL N DFAL LOWERI POH to BHA #12, stand back inj 17:15 - 18:00 0.75 EVAL N DFAL LOW ERi PJSM on handling BHA and LD Baker tools, POH w/ BHA #12, Std back CSH, LD Baker tools 18:00 - 18:15 0.25 EVAL N DFAL LOW ER1 R/U floor for running motor & mill drifting BHA. 18:15 - 18:30 0.25 EVAL N DFAL LOWERI PJSM on P/U &RIH motor/mill & 1-1/4" CHS tbg. 18:30 - 20:00 1.50 EVAL N DFAL LOWERI P/U drifting BHA #13 with 2.30" D331 mill, 2-1/8" straight motor, lower MHA, up jar, 80jts of 1-1/4" CSH tbg, XO & upper MHA. M/U Injector. 20:00 - 21:45 1.75 EVAL N DFAL LOWERI RIH with drifting BHA #13 to 9900'. Wt check = Up - 37k, Down - 25k. 21:45 - 22:20 0.58 EVAL N DFAL LOWERI Ease in hole & tag C~3 9915' (suspect @ the TOL). P/U & wash down & up 4x to 9995'. Cont RIH with minor drag like we're pushing down some junk ahead of us. 22:20 - 00:00 1.67 EVAL N DFAL LOWERI Continue washing in hole ~ 1.5bpm/2000psi & P/U @ frequent intervals. Tag & stall @ 10340'. P/U & reduce pump to min rate. Continue pushing junk in hole. 2/7/2007 00:00 - 00:35 0.58 EVAL N DFAL LOW ER1 Tag & stall ~ 10496' (suspect C~ the LSL sub). P!U & wash down & up several times & manage to work junk past the LSL sub. 00:35 - 01:30 0.92 EVAL N DFAL LOW ER1 Continue washing & pushing junk thru 2-7/8" Lnr C~2 ~ 1.5bpm/2150psi. Tag PBTD @ 12334'. 01:30 - 02:40 1.17 EVAL N DFAL LOW ER1 POOH drifting BHA#13 from PBTD to 9800' (above TOL) without any drag or O/pull. 02:40 - 03:45 1.08 EVAL N DFAL LOWERI RIH & drift clean without pumps to 10700' below LSL sub without problems. Continue RIH to PBTD. Meanwhile pump down 150kcps flopro pill. 03:45 - 04:25 0.67 EVAL N DFAL LOWERI Pump out 2bbls of hi-vis flopro pill ahead. POOH & lay-in 11 bbls of 150kcps flopro pill 1:1 in liner to 10400'. 04:25 - 04:45 0.33 REMCM N DFAL RUNPRD Shut in wellbore & squeeze-in hivis flopro pill into open perfs C~? min rate. Achieve 800psi WHP after 1.5bbls pumped & was able to hold static for 15mins. 04:45 - 05:45 1.00 REMCM N DFAL RUNPRD Circ out excess hivis flopro pill. ', 05:45 - 08:30 2.75 REMCM N DFAL RUNPRD POOH to BHA #13 chasing excess flopro pill to surface, break ~ out Inj and CTC, drop 1/2" steel ball, MU CTC and inj, pumped 1.5 bbls of KCL, sheared circ sub at 3100psi, std back inj 08:30 - 09:30 1.00 REMCM N DFAL RUNPRD POH w/ BHA #13, std back 1 1/4" CSH 09:30 - 11:00 1.50 REMCM N DPRB RUNPRD Conference call between rig team and Anchorage team, discussing line item remedial liner cementing plan, SLB staged re-enactment of SLB employee, Joe Nielsen smashed finger injury on Nordic 1 2/02/2007, took pictures to describe incident. See IR 214228 11:00 - 11:15 0.25 REMCM N DPRB RUNPRD Finished POH, LD Baker drifting BHA #13 11:15 - 11:45 0.50 REMCM N DPRB RUNPRD PU Baker cementing tools, held PJSM, MU cementing BHA #14 11:45 - 12:45 1.00 REMCM N DPRB RUNPRD PJSM, Install volume dart, RU dart catcher, Pump volume dart at 2.51 bpm @ 1530psi, Calculated 2 3/8" CT Volume for Printed: 2/12/2007 10:13:51 AM ~ ~ BP EXPLORATION Page 14 of 16 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: ell Name: e: Name: From - To __ - G-24 G-24 ~ REENTE NORDIC NORDIC Hours ~ - --t R+COM CALIST 1 Task PLET A Code E NPT ~ ~ Start Rig Rig Phase Spud Date: 12/5/1986 : 1/20/2007 End: 2/10/2007 Release: 2/10/2007 Number: N1 Description of Operations ', 2/7/2007 11:45 - 12:45 1.00 --- REMCM --- N --- DPRB RUNPRD 15467 - 59.8bbls, Actual Dart volume 61.6bbls micro motion, RD dart catcher 12:45 - 15:15 2.50 REMCM N DPRB RUNPRD MU CTC, stab inj, TIH w/ cementing BHA #14 to 9906' 15:15 - 15:45 0.50 REMCM N DPRB RUNPRD Establish Circ w/ 2 %KCL at .5 bpm, 95 psi 15:45 - 16:00 0.25 REMCM N DPRB RUNPRD Stung into deployment sleeve at 9922', s/o w/ 10k down, sheared solid seat w/ 1200psi, Circ at 3 bpm, 3000 psi, 16:00 - 17:00 1.00 REMCM N SFAL RUNPRD Lost rig power w/ Gen #2, switched to Gen #1, troubleshooting Gen #2, Circ 157 bbls at 2.5bpm, 2500psi, Held PJSM w/ crews and cmtr's on cement plan, Lost power to Gen #1 briefly, over heated when louver shut, was able to bring back on line ~~ quickly. ', 17:00 - 18:00 1.00 REMCM N SFAL RUNPRD Circ at 1.5 bpm, 1000psi, while troubleshooting Gen #2 power ~ failure, unable to bring back on line. 18:00 - 20:00 2.00 REMCM N SFAL RUNPRD Fetch replacement parts from Nordic-2. Changeout PWM, power module, diode bridge & bring Gen#2 back online. 20:00 - 20:15 0.25 REMCM N DPRB RUNPRD PJSM with all personnel concerning cementing operations. Continue circulating 2% KCL @ 1.5bpm & 1000psi. 20:15 - 22:20 2.08 REMCM N DPRB RUNPRD Batch mix 16bbls 15.8ppg 'G' latex cmt with additives. Cmt to wt ~ 20:45hrs. Flush/PT lines to 4k. Pump 7bbls cmt slurry ~ 1.55/1.55bpm & 1400psi. Zero MM in-total and out-total. Pump 4.4bbls of 15.8ppg mud behind cement. Nordic In Micro-motion was reading double the SLB Cementers reading while pumping cement & heavy mud while the Out Micro-motion was ca. 2 tenths off. Close inner reel valve & clean lines. Load/launch CTWP with 500psi. Chase with 30bbls bio-KCL C°2 1.85/1.80bpm & 1790psi. Reduce pumps to 1.20bpm/750psi with cement @ the pert after 58.7bbls. Zero MM out-total. Slow down pumps to 0.5bpm/520psi ~ lbbl before landing plug. Land CT wiper plug C~3 65bbls & shut down pumps. 7bbls cmt pumped into the lap. CIP C 22:20hrs. 22:20 - 22:30 0.17 REMCM N DPRB RUNPRD P/U cementing BHA 10' out of deploy sleeve. Bring on pumps & shear CT wiper plug ~ 1700psi. Establish Circ 0.3bpm/350psi. RBIH 6' slowly pumping ~ min rate 0.3bpm/350psi & contaminate TOL. 22:30 - 00:00 1.50 REMCM N DPRB RUNPRD Circ lbbl of bio-KCL at 0.3bpm on TOL. POOH cementing BHA @ 100fpm pumping at 0.55bpm to replace CT voidage only. 2/8/2007 00:00 - 00:45 0.75 REMCM N DPRB RUNPRD Continue POOH cementing BHA @ 100fpm pumping at 0.55bpm to replace CT voidage only. 00:45 - 01:15 0.50 REMCM N DPRB RUNPRD OOH. S/B injector. UD cementing BHA#14. 01:15 - 01:30 0.25 REMCM N DPRB RUNPRD PJSM on P/U &RIH motor/mill & 1-1/4" CHS tbg. 01:30 - 02:00 0.50 REMCM N DPRB RUNPRD P/U cleanout BHA #15 with 2.74" D331 mill, 2-1/8" straight motor, lower MHA, 24jts of 1-1/4" CSH tbg, XO & upper MHA. 02:00 - 02:15 0.25 REMCM N DPRB RUNPRD Pull test Baker CTC to 35k & P/test to 3500 psi - OK. M/U Injector. 02:15 - 02:45 0.50 REMCM N DPRB RUNPRD RIH with cleanout BHA #15 to 4000'. 02:45 - 10:15 7.50 REMCM N DPRB RUNPRD W.O.C. to achieve 2000psi compressive strength 10:15 - 11:30 1.25 REMCM N DPRB RUNPRD RIH with cleanout BHA #15, tagged up at 9940', noticed a slight bobble at 9910', Up Wt 37k, Dn Wt21.5k at 9850' w/ .21 bpm 223 psi 11:30 - 12:35 1.08 REMCM N DPRB RUNPRD Drill past 9940' (stalled out 7x before working past), circ at 1.35 bpm 1800 psi 12:35 - 14:00 1.42 REMCM N DPRB RUNPRD RIH to 9970', attempt to drill past 9970', stalled out mtr several times, circ at 1.75 bpm, pumped 77 bbls, returns showed Printed: 2/12/2007 70:13:51 AM +~ BP EXPLORATION Page 15 of 16 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date , Name: ell Name: e: Name: From - To G-24 G-24 A REENTE NORDIC NORDIC Hours ~~ R+COM CALIST 1 Task ~ PLET A Code I E NPT Start Rig Rig Phase Spud Date: 12/5/1986 : 1/20/2007 End: 2/10/2007 Release: 2/10/2007 Number: N1 Description of Operations 2/8/2007 12:35 - 14:00 1.42 REMCM N DPRB RUNPRD biozan mud (white milky returns MW at 8.5ppg) followed by cement contaminated mud weighing 10.2ppg with a PH of 12, contaminated fluid was strung out over 50 bbls 14:00 - 16:00 2.00 REMCM N DPRB RUNPRD POH to BHA, std back inj 16:00 - 17:00 1.00 REMCM N DPRB RUNPRD POH w/ BHA, std back CSH, LD 2.74" mill and mtr. no visual damage to rerun mill, water courses were blocked w/ cmt, noticed a few metal shavings embedded with cmt debris 17:00 - 17:15 0.25 REMCM N DPRB RUNPRD PJSM on cutting CT 17:15 - 18:00 0.75 REMCM N DPRB RUNPRD RU, Cut 25' of CT, rehead CTC, Pull and PT CTC 18:00 - 20:00 2.00 REMCM N DPRB RUNPRD Take on new KCL fluid into pits. Meanwhile review forward plan with ANC & decide to RBIH with a 2.30" D331 mill. Fetch new mill from HCC & new up jar from BOT. 20:00 - 20:15 0.25 REMCM N DPRB RUNPRD PJSM on P/U &RIH motor/mill & 1-1/4" CHS tbg. 20:15 - 22:30 2.25 REMCM N DPRB RUNPRD P/U cleanout BHA #16 with 2.30" D331 mill, 2-1/8" straight motor, lower MHA, up jar, 80jts of 1-1/4" CSH tbg, XO & upper MHA. M/U Injector. 22:30 - 23:45 1.25 REMCM N DPRB RUNPRD RIH with cleanout BHA #16 to 9900'. Wt check = Up - 36k, Down - 21 k. establish freespin ~ 1.55bpm/2350psi. 23:45 - 00:00 0.25 REMCM N DPRB RUNPRD Ease in hole & tag ~ 9969.1'. 2/9/2007 00:00 - 01:15 1.25 REMCM N DPRB RUNPRD P/U & wash down to 10200' with 1.55/1.55bpm, 2350/2400psi, 3k W OB & 75-275fph. 01:15 - 02:00 0.75 REMCM N DPRB RUNPRD Tag & stall ~ 10200'. P/U & mill down to 10217' with 1.55/1.55bpm, 2350/2550psi, 3k WOB & 15fph. Observe milling break ~ 10217'. 02:00 - 04:50 2.83 REMCM N DPRB RUNPRD Mill down with 1.55/1.55bpm, 2350/2550psi, 3k WOB & 85-175fph. Sweep well with 5bbls of hivis flopro pill. Wt checking every 150' _> Up - 35k, Down - 20k. Observe hard milling ~ 10433'. Getting cement contaminated fluids back. 04:50 - 05:30 0.67 REMCM N DPRB RUNPRD Mill down to 10452' with 1.55/1.55bpm, 2350/2550psi, 3k WOB & 15-25fph. 05:30 - 06:00 0.50 REMCM N DPRB RUNPRD Conduct 100' wiper. RBIH & stack out 3x (~ 10317'. PUH to 9900' above TOL. RBIH to 10452' & sweep well with 10bbls of hivis flopro pill. 06:00 - 07:15 1.25 REMCM N DPRB RUNPRD Mill down to 10452' to 10475 with 1.55/1.55bpm, _ 2400/2650psi, 3k WOB & 15-30fph. 07:15 - 08:00 0.75 REMCM N DPRB RUNPRD Circ hole clean w/ 15 bbl Hi-Vis Flo-Pro sweep, reciprocating CT f/ 10475' to 10400', on btm when sweep exited mill 08:00 - 09:45 1.75 REMCM N DPRB RUNPRD POH to 9788', circ at 1.6bpm, 2575 psi, btms up showed trace of cmt in returns, IA -650psi 09:45 - 10:30 0.75 REMCM N DPRB RUNPRD Pressure test Liner lap and cmt plug inside liner at 10475' back to surface to 500 - 2096 psi, stage up in 500psi increments with 8.5ppg brine, IA 688 psi, OA 0 psi, Chart 30 min test, lost 54 psi in first 15 min, lost 18 psi in last 15 min, Lost 72 psi over 30 minutes, Passed, released pressure, open well Monitor pressure test for 30 mins ISIP = 2075 psi 05 min = 2035 psi 10 min = 2025 psi 15 min = 2021 psi 20 min = 2014 psi 25 min = 2007 psi Printed: 2/12/2007 10:13:51 AM • • BP EXPLORATION Page 16 of 16 Operations Summary Report Legal Well Name: G-24 Common Well Name: G-24 p- Spud Dater 12/5/1986 Event Name: REENTER+COMPLETE Start: 1/20/2007 End: 2/10/2007 Contractor Name: NORDIC CALISTA Rig Release: 2/10/2007 Rig Name: NORDIC 1 Rig Number: N1 Date : From - To Hours ~ Task Code I NPT Phase Description of Operations 2/9/2007 09:45 - 10:30 0.75 REMCM N DPRB RUNPRD 30 min = 2003 psi 10:30 - 11:00 0.50 REMCM N DPRB RUNPRD RIH f/ 9788' - 10475', circ at 1.5 bpm, 2150psi, Dn Wt 19k, no problems with trip in hole 11:00 - 11:30 0.50 REMCM N DPRB RUNPRD Mill down from 10475' to 10504' with 1.50/1.48bpm, 2168/2080psi, Up Wt 36.3k, 1 - 3k WOB & 99fph. Hole started packing off, getting sticky w/ 10k overpull, worked CT up hole with 2-3 k intermittent drag f/ 10504' to 9800' 11:30 - 12:15 0.75 REMCM N DPRB RUNPRD Work pipe up and down interval, circ affected hole clean 12:15 - 12:30 0.25 REMCM N DPRB RUNPRD Mill down from 10504' to 10533' with 1.56/1.58bpm, 2200/2100psi, 3k WOB & 210fph. Stacking weight, mtr work of j 50 to 150psi ~I 12:30 - 12:45 0.25 REMCM N DPRB RUNPRD Wiper trip to 10400', no problems 12:45 - 13:05 0.33 REMCM N DPRB RUNPRD Mill down from 10533' to 10556' with 1.50/1.45bpm, 2340/2250psi, 3k WOB, 30 - 97fph. hard milling at 10539', mtr work 13:05 - 13:30 0.42 REMCM N DPRB RUNPRD RIH from 10556' to 10615', 1.51/1.49bpm, 2201/2109psi, 225fpm, up wt 38k, do wt 19.7k at 10575', no mtr work 13:30 - 13:40 0.17 REMCM N DPRB RUNPRD Wiper trip to 10450', no problems 13:40 - 15:00 1.33 REMCM N DPRB RUNPRD RIH from 10615' to 12300', 1.52/1.50bpm, 2208/2113psi, 598 - 1980fpm, do wt 18.5k, no mtr work, up wt 41.3k at 12300' 15:00 - 17:00 2.00 REMCM N DPRB RUNPRD POH to 9800' with 1.52bpm, 1945psi, no problems, waiting on vac trk w/ new 2% KCL water, returns showed 17:00 - 18:00 1.00 REMCM N DPRB RUNPRD RBIH to 12300', 50' from PBTD, circ down 25bb1 perf pill sweep followed by new KCL water at 1.5bpm, 2850psi 18:00 - 20:10 2.17 REMCM N DPRB RUNPRD POH to BHA, sweeping hole with 25bb1 perf pill, displace well to new 2% KCL water 20:10 - 20:30 0.33 REMCM N DPRB RUNPRD OOH. S/B injector. VD upper MHA. Drop 1/2" ball & open up circ sub. B/D CSH with air. RU for R/B 1-1/4" CSH. 20:30 - 20:45 0.25 REMCM N DPRB RUNPRD PJSM for R/B CSH. 20:45 - 22:00 1.25 REMCM N DPRB RUNPRD R/B 40 stands of 1-1/4" CSH. Meanwhile move Nordic-1 camp from G-pad to C-pad. 22:00 - 22:15 0.25 REMCM N DPRB RUNPRD VD jar, lower MHA, motor & mill. 22:15 - 00:00 1.75 RIGD P POST RIH nozzle BHA to 2500'. Pump down 26bbls of McOH to nozzle. POOH freeze protecting with 60/40 McOH. FP from 300' with 100% McOH. SI master valve. 2/10/2007 00:00 - 00:15 0.25 RIGD P POST PJSM for B/D CT with N2. 00:15 - 00:30 0.25 RIGD P POST P/T N2 lines - OK. 00:30 - 02:00 1.50 RIGD P POST Blow down CT with N2. Meanwhile clean out pits & tanks. 02:00 - 02:15 0.25 RIGD P POST PJSM for installing BPV. 02:15 - 02:45 0.50 RIGD P POST S/B injector. Open up master valve. R/U dry rod & install BPV in THS. R/D dry rod. SI master & swab valves (23-1/2 turns each). Install SSV fuseable cap. 02:45 - 03:00 0.25 RIGD P POST PJSM for stripping off & pulling back CT to the reel. 03:00 - 05:30 2.50 RIGD P POST P/U injector & cut off CTC. Slip connector into CT & pull test. Strip-off CT from injector & spool back CT stub to reel. Secure CT with crossbar and chains & prep reel for shipment. S/B injector. 05:30 - 09:30 4.00 RIGD P POST Prep to N/D BOPE. Meanwhile continue cleaning out outside tanks., ND BOP, Install and PT tree cap to 1000psi, secured well, Released Rig at 09:30 Hrs on 2/10/07 - Printed: 2/12/2007 10:13:51 AM • • by BP Alaska $ Baker Hughes INTEQ Survey Report 1NTE Q Company: BP Amoco Date: 2/15/2007 .Time: 08:31`.46 Page: 1 .Field: Prudhoe Bay.'. Co-ordiaate(NE) Reference: Well: G-24, True North Site: PB G Pad Vertical (1'VD) Reference: 30 ; 2412/5/1986.00:00 72.1 Well: G 24 Section (VS) Reference: Well {O.OONO,OOE,172.42AZi) Wellpath: G-24A Survey Cakalation Method: ... Minimum`Curvature Db: Grade Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2006 Site: PB G Pad TR-11-13 UNITED STATES :North Slope Site Position: Northing: 5966832.87 ft Latitude: 70 18 58.211 N From: Map Fasting: 656301.39 ft Longitude: 148 43 59.013 W Positron Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.19 deg Well: G-24 Sbt Name: G-24 Well Position: +N/-S 2072.15 ft Northing: 5968946.00 ft Latitude: 70 19 18.588 N +E!-W 1997.32 ft Fasting : 658255.00 ft Longitude: 148 43 0.723 W Position Uncertainty: 0.00 ft Wellpath: G-24A Drilled From: G-24AP61 Tie-on Depth: 11239.04 ft Current Datum: 30:2412/5/1986 00:00 Height 72.10 ft Above System Datum: Mean Sea Level Magnetic Data: 1/29/2007 Declination: 24.06 deg Field Strength: 57656 nT Mag Dip Angle: 80.94 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 36.19 0.00 0.00 172.42 Survey Program for Definitive Wellpath Date: 1/29/2007 Validated: Yes Version: 2 Actual From To Sarvey Toolcode Tool Name ft ft 46.40 10161.85 1 : Schlumberger GCT multishot GCT-MS Schlumberger GCT multishot 10181.00 11239.04 MWD (10181.00-12205.00) (1) MWD MWD -Standard 11245.00 12382.00 MWD (11245.00-12382.00) MWD MWD -Standard Annotation MD TVD ft ft 11239.04 9035.05 TIP 11245.00 9034.76 KOP 12382.00 9032.66 TD Survey: MWD Start Date: 1/29/2007 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path • • by BP Alaska ~ti~$ Baker Hughes INTEQ Survey Report 1NTE Q CompAny: BP Amoco Date: 2/15/2007 Time: 08:31:48 Page: 2 Field: Prudhoe Bay. Co•ordioate(NE) Reference: Well: G-24, True NOrth Site:. PB G Pad Vertical (TVD) Reference: 30:24 12/5/1986.00:00 72.1 Well: G-24 Section (VS) Retereace: WeIF (O.OON,O.OOE,172.42Az~ Wellpatb: G-24A Sarvey Cakalatio a Method: Minimum Curvature Db: OraGe Sorvey MD Intl Airm TVD SysTVD N/S E/W MapN MapE YS DLS Tool ft deg deg ft tt ft ft ft ft ' ft degM 00ft 11239.04 92.59 235.28 9035.05 8962.95 -4018.39 1506.72 5964960.56 659846.00 4181.98 0.00 MWD 11245.00 92.98 236.32 9034.76 8962.66 -4021.73 1501.79 5964957.11 659841.15 4184.64 18.62 MWD 11268.04 94.99 239.54 9033.16 8961.06 -4033.94 1482.32 5964944.50 659821.94 4194.17 16.45 MWD 11297.28 94.96 243.58 9030.63 8958.53 -4047.81 1456.71 5964930.10 659796.63 4204.54 13.76 MWD 11330.54 94.64 245.20 9027.84 8955.74 -4062.13 1426.83 5964915.15 659767.06 4214.80 4.95 MWD 11361.25 93.27 242.08 9025.72 8953.62 -4075.73 1399.38 5964900.97 659739.90 4224.67 11.07 MWD 11391.51 90.51 240.52 9024.73 8952.63 -4090.26 1372.86 5964885.89 659713.69 4235.56 10.48 MWD 11423.26 87.04 238.01 9025.41 8953.31 -4106.47 1345.58 5964869.10 659686.76 4248.04 13.49 MWD 11454.81 86.98 235.36 9027.05 8954.95 -4123.78 1319.25 5964851.25 659660.81 4261.73 8.39 MWD 11486.34 87.50 232.19 9028.57 8956.47 -4142.39 1293.85 5964832.11 659635.81 4276.82 10.18 MWD 11515.74 87.96 230.11 9029.73 8957.63 -4160.81 1270.97 5964813.21 659613.33 4292.07 7.24 MWD 11545.25 88.33 227.08 9030.69 8958.59 -4180.32 1248.85 5964793.24 659591.62 4308.49 10.34 MWD 11576.29 88.82 222.92 9031.46 8959.36 -4202.25 1226.91 5964770.85 659570.16 4327.34 13.49 MWD 11606.17 89.68 218.79 9031.85 8959.75 -4224.85 1207.37 5964747.85 659551.10 4347.16 14.12 MWD 11636.68 89.62 214.71 9032.04 8959.94 -4249.29 1189.12 5964723.03 659533.37 4368.98 13.37 MWD 11663.59 90.45 211.33 9032.02 8959.92 -4271.85 1174.46 5964700.17 659519.19 4389.41 12.93 MWD 11696.60 91.13 210.46 9031.57 8959.47 -4300.17 1157.51 5964671.50 659502.84 4415.25 3.34 MWD 11725.82 89.89 213.44 9031.31 8959.21 -4324.96 1142.05 5964646.39 659487.91 4437.79 11.05 MWD 11752.31 88.76 216.58 9031.62 8959.52 -4346.65 1126.86 5964624.38 659473.18 4457.29 12.60 MWD 11789.45 88.73 220.37 9032.43 8960.33 -4375.72 1103.76 5964594.84 659450.70 4483.05 10.20 MWD 11818.68 89.80 224.53 9032.81 8960.71 -4397.28 1084.04 5964572.87 659431.44 4501.82 14.69 MWD 11847.41 89.80 227.44 9032.91 8960.81 -4417.24 1063.38 5964552.48 659411.20 4518.89 10.13 MWD 11876.53 90.78 231.92 9032.76 8960.66 -4436.08 1041.18 5964533.18 659389.41 4534.63 15.75 MWD 11908.15 90.84 235.87 9032.31 8960.21 -4454.70 1015.64 5964514.02 659364.27 4549.73 12.49 MWD 11946.66 90.48 240.95 9031.87 8959.77 -4474.87 982.85 5964493.17 659331.92 4565.39 13.22 MWD 11978.05 90.75 245.00 9031.53 8959.43 -4489.13 954.90 5964478.33 659304.27 4575.84 12.93 MWD 12021.29 89.89 249.99 9031.29 8959.19 -4505.67 914.97 5964460.95 659264.70 4586.98 11.71 MWD 12049.75 90.38 250.37 9031.23 8959.13 -4515.32 888.19 5964450.73 659238.13 4593.01 2.18 MWD 12079.57 90.75 246.65 9030.93 8958.83 -4526.24 860.45 5964439.23 659210.63 4600.18 12.54 MWD 12111.14 90.41 243.07 9030.61 8958.51 -4539.65 831.88 5964425.22 659182.35 4609.70 11.39 MWD 12141.08 89.31 239.16 9030.68 8958.58 -4554.11 805.67 5964410.21 659156.45 4620.58 13.57 MWD 12174.50 89.80 236.02 9030.94 8958.84 -4572.02 777.46 5964391.72 659128.63 4634.62 9.51 MWD 12205.22 89.31 232.33 9031.18 8959.08 -4590.00 752.56 5964373.22 659104.11 4649.15 12.12 MWD 12237.07 88.36 228.58 9031.83 8959.73 -4610.27 728.00 5964352.44 659080.00 4666.01 12.14 MWD 12265.65 87.80 227.09 9032.79 8960.69 -4629.44 706.83 5964332.82 659059.24 4682.22 5.57 MWD 12295.25 89.56 224.61 9033.47 8961.37 -4650.05 685.60 5964311.77 659038.45 4699.85 10.27 MWD 12327.00 90.75 221.96 9033.38 8961.28 -4673.16 663.84 5964288.21 659017.17 4719.89 9.15 MWD 12382.00 90.75 221.96 9032.66 8960.56 -4714.06 627.07 5964246.55 658981.28 4755.58 0.00 MWD • • by BP Alaska S Baker Hughes INTEQ Survey Report INTE Q Companyt BP Amoco Dates 2/15/2007. Time: 08:30:28 Page: t FieM; Prudhoe Bay Co-ordinate(NE) Reference: Well: G-24, True North Site: PB G Pad Vertical ('PVD) Reference: 30 : 24 12!5/1986 00:00 72.1 Well: G-24 Section (VS) Reference: Well (O.OON,O.OOE,170.28Azij Wellpath: G-24AP61 Survey Calcnlatioc Method: Minimum Curvature Db:. Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2006 Site: PB G Pad TR-11-13 UNITED STATES :North Slope Site Position: Northing: 5966832.87 ft Latitude: 70 18 58.211 N From: Map Easting: 656301.39 ft Longitude: 148 43 59.013 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.19 deg Weil: G-24 Sbt Name: G-24 Well Position: +N/-S 2072.15 ft Northing: 5968946.00 ft Latitude: 70 19 18.588 N +E/-W 1997.32 ft Easting : 658255.00 ft Lougitude: 148 43 0.723 W Position Uncertainty: 0.00 ft Wellpath: G-24AP61 Drilled From: G-24 Tie-on Depth: 10161.85 ft Current Datum: 30:24 12/5/1986 00:00 Height 72.10 ft Above System Datum: Mean Sea Level Magnetic Data: 12/31/2006 Declination: 24.09 deg Field Strength: 57654 nT Mag Dip Angle: 80.94 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 36.19 0.00 0.00 170.28 Survey Program for Definitive Wellpath Date: 4/29/2006 Validated: Yes Version: 3 Actual From To Survey Toolcode Tool Name ft ft 46.40 10161.85 1 : Schlumberger GCT multishot GCT-MS Schlumberger GCT multishot 10181.00 12205.00 MWD (10181.00-12205.00) MWD MWD -Standard Annotation MD TVD ft ft 10161.85 8914.64 TIP 10181.00 8929.06 KOP 12205.00 9033.65 TD Survey: MWD Start Date: 1/24/2007 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path Survey MD Inc! Azim TVD Sys TVD N/S E/VV MapN MapE VS DLS Tool ft deg deg ft ft ft ft ft ft ft deg/100ft 10161.85 41.12 163.56 8914.64 8842.54 -3244.17 2083.19 5965746.71 660405.98 3549.18 0.00 MWD 10181.00 41.22 163.54 8929.06 8856.96 -3256.26 2086.76 5965734.70 660409.81 3561.70 0.53 MWD 10210.74 46.28 163.55 8950.53 8878.43 -3275.97 2092.59 5965715.11 660416.04 3582.12 17.01 MWD 10240.30 52.98 167.55 8969.67 8897.57 -3297.77 2098.16 5965693.44 660422.08 3604.55 24.89 MWD 10270.11 57.73 174.25 8986.63 8914.53 -3321.97 2102.00 5965669.33 660426.42 3629.04 24.40 MWD 10311.76 65.01 178.91 9006.58 8934.48 -3358.42 2104.12 5965632.93 660429.32 3665.33 20.04 MWD 10345.95 69.08 190.55 9019.95 8947.85 -3389.72 2101.49 5965601.59 660427.34 3695.73 33.52 MWD 10375.83 74.64 194.94 9029.25 8957.15 -3417.39 2095.21 5965573.79 660421.65 3721.95 23.26 MWD 10403.94 79.80 199.53 9035.47 8963.37 -3443.55 2087.08 5965547.47 660414.07 3746.36 24.30 MWD 10433.58 84.82 206.17 9039.44 8967.34 -3470.59 2075.68 5965520.19 660403.24 3771.09 27.92 MWD 10472.32 90.02 215.12 9041.19 8969.09 -3503.84 2055.97 5965486.54 660384.24 3800.54 26.69 MWD • • by BP Alaska sus Baker Hughes INTEQ Survey Report INTE Q Company: BP Amoco Date: 2/15!2007 Time: 08130:28 Page: 2 Field: Prudhoe Bay Co-ordinnte(NE) Reference: ' Well: G24, True North Site: PB G Pad Vertical (TVD) Reference; 30:2412/5/1986 00:00 72.1 Well: G-24 Section (VS) Reference: WeU (l).OON,O.OOE,170.28Azi) Wellpath: G-24AP61 Survey Calculation Method:. Minimum Curvature Db: OraGe Survey MD Inc! Azim TVD Sys TVD N/S E/W MapN MapE VS DLS Tool ft deg deg ft ft ft ft ft ft ft deg/100ft 10494. 23 ^ 90.23 222.68 9041.14. 8969.04 -3520.88 2042.22 5965469.22 660370.86 3815.01 34.52 MWD 10517. 99 89.25 225.97 9041.25 8969.15 -3537.87 2025.62 5965451.88 660354.62 3828.96 14.45 MWD 10546. 74 93.58 230.74 9040.54 8968.44 -3556.96 2004.16 5965432.34 660333.57 3844.16 22.40 MWD 10575. 61 94.63 236.01 9038.47 8966.37 -3574.14 1981.06 5965414.69 660310.83 3857.18 18.57 MWD 10606. 06 93.39 239.61 9036.34 8964.24 -3590.31 1955.35 5965397.97 660285.48 3868.79 12.48 MWD 10637.45 91.43 243.06 9035.02 8962.92 -3605.35 1927.84 5965382.35 660258.29 3878.97 12.63 MWD 10662. 32 90.87 246.15 9034.52 8962.42 -3616.02 1905.38 5965371.22 660236.06 3885.69 12.62 MWD 10693. 41 91.77 243.05 9033.81 8961.71 -3629.35 1877.31 5965357.30 660208.28 3894.10 10.38 MWD 10723. 99 89.43 239.25 9033.48 8961.38 -3644.10 1850.53 5965341.99 660181.82 3904.12 14.59 MWD 10753. 75 87.50 236.77 9034.28 8962.18 -3659.86 1825.30 5965325.71 660156.93 3915.39 10.56 MWD 10784. 77 86.75 232.87 9035.84 8963.74 -3677.70 1799.99 5965307.33 660132.00 3928.71 12.79 MWD 10815. 43 87.84 230.11 9037.29 8965.19 -3696.77 1776.02 5965287.77 660108.45 3943.46 9.67 MWD 10852. 71 88.91 226.78 9038.34 8966.24 -3721.48 1748.14 5965262.47 660081.09 3963.11 9.38 MWD 10896. 13 88.04 221.97 9039.50 8967.40 -3752.50 1717.80 5965230.82 660051.41 3988.56 11.25 MWD 10923. 36 89.25 220.50 9040.14 8968.04 -3772.97 1699.85 5965209.98 660033.91 4005.71 6.99 MWD 10954. 02 90.29 217.58 9040.27 8968.17 -3796.78 1680.54 5965185.77 660015.10 4025.92 10.11 MWD 10991. 76 92.99 212.30 9039.19 8967.09 -3827.69 1658.95 5965154.41 659994.17 4052.75 15.71 MWD 11027. 89 93.74 206.98 9037.06 8964.96 -3859.03 1641.12 5965122.71 659977.00 4080.62 14.84 MWD 11056. 24 91.67 209.01 9035.73 8963.63 -3884.03 1627.83 5965097.44 659964.24 4103.02 10.22 MWD 11088. 02 89.59 212.53 9035.38 ~ 8963.28 -3911.33 1611.57 5965069.80 659948.57 4127.19 12.86 MWD 11116. 11 88.66 216.39 9035.81 8963.71 -3934.48 1595.68 5965046.32 659933.17 4147.33 14.13 MWD 11146. 27 89.55 221.54 9036.28 8964.18 -3957.92 1576.72 5965022.49 659914.71 4167.23 17.33 MWD 11175. 60 89.16 226.76 9036.61 8964.51 -3978.96 1556.30 5965001.03 659894.74 4184.52 17.85 MWD 11205. 48 91.83 231.75 9036.35 8964.25 -3998.45 1533.68 5964981.06 659872.53 4199.92 18.94 MWD 11239. 04 92.59 235.28 9035.05 8962.95 -4018.39 1506.72 5964960.56 659846.00 4215.02 10.75 MWD 11267. 60 94.47 240.27 9033.29 8961.19 -4033.58 1482.61 5964944.86 659822.22 4225.93 18.64 MWD 11296. 43 94.41 244.34 9031.06 8958.96 -4046.94 1457.17 5964930.97 659797.07 4234.80 14.08 MWD 11328. 13 92.41 247.39 9029.18 8957.08 -4059.88 1428.29 5964917.43 659768.48 4242.68 11.49 MWD 11354. 92 92.19 246.09 9028.10 8956.00 -4070.45 1403.70 5964906.35 659744.11 4248.95 4.92 MWD 11387. 88 89.92 244.77 9027.49 8955.39 -4084.15 1373.73 5964892.02 659714.44 4257.40 7.97 MWD 11415. 47 88.84 243.71 9027.79 8955.69 -4096.14 1348.89 5964879.51 659689.86 4265.02 5.48 MWD 11446. 40 87.16 239.74 9028.87 8956.77 -4110.78 1321.67 5964864.30 659662.96 4274.86 13.93 MWD 11475. 84 86.39 237.77 9030.53 8958.43 -4126.02 1296.54 5964848.53 659638.16 4285.64 7.17 MWD 11505. 56 85.72 234.88 9032.57 8960.47 -4142.46 1271.87 5964831.58 659613.84 4297.68 9.96 MWD 11534. 96 86.05 231.41 9034.68 _ 8962.58 -4160.05 1248.41 5964813.50 659590.76 4311.06 11.83 MWD 11565. 39 87.43 228.33 9036.42 ~' 8964.32 -4179.62 1225.19 5964793.44 659567.95 4326.44 11.08 MWD 11594. 51 90.84 226.23 9036.85 8964.75 -4199.37 1203.80 5964773.24 659546.99 4342.29 13.75 MWD 11624. 29 90.75 224.36 9036.44 8964.34 -4220.32 1182.64 5964751.86 659526.27 4359.37 6.29 MWD 11657. 21 91.15 222.39 9035.90 8963.80 -4244.24 1160.03 5964727.46 659504.18 4379.13 6.11 MWD 11687. 83 88.94 219.73 9035.87 8963.77 -4267.33 1139.92 5964703.96 659484.56 4398.49 11.29 MWD 11717. 84 88.79 214.77 9036.47 8964.37 -4291.20 1121.77 5964679.71 659466.92 4418.96 16.53 MWD 11752. 22 89.46 209.38 9036.99 8964.89 -4320.32 1103.52 5964650.22 659449.29 4444.58 15.80 MWD 11786. 89 90.54 211.04 9036.99 8964.89 -4350.28 1086.08 5964619.90 659432.48 4471.17 5.71 MWD 11818. 52 92.04 215.77 9036.28 8964.18 -4376.67 1068.67 5964593.15 659415.64 4494.24 15.68 MWD 11848. 34 93.15 219.85 9034.93 8962.83 -4400.20 1050.41 5964569.24 659397.88 4514.36 14.17 MWD 11876. 05 91.86 223.94 9033.72 8961.62 -4420.80 1031.93 5964548.25 659379.84 4531.54 15.46 MWD 11906. 90 89.71 227.74 9033.29 8961.19 -4442.29 1009.81 5964526.31 659358.17 4548.99 14.15 MWD 11935. 93 89.92 230.10 9033.39 8961.29 -4461.36 987.93 5964506.78 659336.70 4564.10 8.16 MWD 11966. 06 90.11 233.16 9033.38 8961.28 -4480.06 964.31 5964487.59 659313.48 4578.54 10.18 MWD 11991 .26 90.23 235.18 9033.31 ! 8961.21 -4494.81 943.88 5964472.41 659293.37 4589.63 8.03 MWD 12022 .64 90.44 231.30 9033.12 8961.02 -4513.59 918.74 5964453.11 659268.64 4603.90 12.38 MWD 12052 .55 91.18 227.46 9032.70 8960.60 -4533.06 896.05 5964433.17 659246.36 4619.26 13.07 MWD 12082. 93 90.87 224.47 9032.16 8960.06 -4554.17 874.21 5964411.60 659224.98 4636.38 9.89 MWD • • by BP Alaska $ Baker Hughes INTEQ Survey Report 1NTE Q Company: BP Amoco Date:. 2/15/2007 Time:' 08:30:28 Page: 3 k3eld: Prudhoe Bay Co-ordiaate(NE) Reference: Well: G-24, True North Site: PB G Pad Vertical (TVD) Refer~ce: 30:24 12/5/1986 00:00 72.1 Weli: G-24 Section (VS) Retereece: Well (O.OON,O.OOE 170.28Azi) Welipath: G-24APB1 Survey Cakolatioq Method: Minimum Curvature Db: OraGe Survey MD Intl Azim TVD Sys TVD N/S E/W MapN MapE VS DLS Tool' ft deg deg ft ft ft ft ft ft ft- deg/100ft 12117.1 5 89.22 221.10 9032.13 8960.03 -4579.28 850.97 5964386.01 659202.27 4657.21 10.96 MWD 12143.40 88.97 218.64 9032.54 8960.44 -4599.42 834.15 5964365.52 659185.88 4674.22 9.42 MWD 12205.00 88.97 218.64 9033.65 8961.55 -4647.53 795.69 5964316.62 659148.45 4715.15 0.00 MWD • TREE = 4"CA MFRCIN WELLHEAD = ~ McEVOY ACTUATOR= OTIS KB. ELEV = 72.06' BF. ELEV = 35.91' KOP = 2900' Max Angle = 94.99° @ 1 1268' Datum MD = 10105' Datum TV D = 8800' SS I 13-3l8" CSG, 72#, L-80, ID = 12.347" I G -2 4A SAFETY NOTES: FROM CTD/DRLG -DRAFT 2110' 4-1/2" SSSV OTIS LNDNG NIP. ID = 3.813" Minimum ID = 2.30" @ 9964' CMT SHEATH (9~~' ' GAS 1 IFT MANI~RFI S ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 2983 2983 5 MERLA DMY RA 0 04/03/94 4 4986 4757 35 MERLA SO RM 20 03/01/07 3 6981 6361 35 MERLA DMY RA 0 04/03/94 2 8817 7863 38 MERLA DMY RA 0 04/03/94 1 9087 8075 39 MERLA DMY RA 0 04/03/94 9116' ~--~ 4-1/2" PARKER SWS NIP, ID = 3.813" TOP OF 7" LNR ~-j 9209' f s-5/8° csG, a7#, L-80, ID = 8.x81" 9495' TOP OF CMT 9168' TOP OF 3-1/2" X 3-3/16" X 2-7/8" LNR 9964' [CNL: 9926'] EST TOP OF LINER CEMENT 9964' 3-112" X 3-3/16" X-OVER 10013' MECHANICAL WHIPSTOCK 10181' WINDOW 10181' - 10192' PIP TAG 10190' CEMENT RETAINER 10200' CIBP I~ 10227' PERFORATION SUMMARY REF LOG. MGR/CCL/TNNITNF OF 2/212007 TIE-IN LOG: GEOLOGY PDC LOG ANGLEATTOPPERF: 90° @ 10,500' Note: Refer to Production DB for historical pert c- SIZE SPF INTERVAL Opn/Sqz DAB' 2" 6 10.500' - 11,090' Opn 02/02 2" 6 11.550' - 11,750' Opn 02/02 2" 6 11,980'-12,200' Opn 02/02 2" 6 12.260' - 12,330' Opn 02`0 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~ 10282' PBTD 10397' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 10475' 9124' ~ 9-5l8" x 4-112" TM/ HBBP-R RET PKR W/LATCH, ID = 4.00" 9470' 7" MARKER JOINT NOTE: DRILLED CMT OUT OF LNR w/2.3" MILL -POSSIBLE LNR SHEATH 9964' BOT DEPLOY SLEEVE, 6' LONG. 3" ID 9983' 3-112" X NIP. ID = 2.813" 10539' LSL SUB, 3-3/16" x 2-7/8" X-OVER MISSING SLB SCMT TOOL BOW SPRING 12348' 12348' [CNL: 12330') ~ PBTD 3-1 2" X 3-3/16" X 2-7/8" CMTED & PERFED 12382' O O 10216' 4-1/2" OTIS XA SLIDING SLV, ID = 3.813" 10230' TOP OF BLAST JOINTS 10264' BTM OF BLAST JOINTS 10265' 7" x 4-1/2" TMJ HBBP PERM PKR, ID = 3.875" 10273' 4-1/2" PARKER SWS NIP, ID = 3.813" 10278' 4-1/2" PARKER SWN NIP, ID = 3.725" 10282' 4-1l2" TTL WLEG 10288' ELMD TT LOGGED 02/25/91 10323' FISH -BOW SPRING LOST 02/11 /93 25" X 0.05" X 0.1875" DATE REV BY COMMENTS DATE REV BY COMMENTS 12/06/87 ORIGINAL COMPLETION 02/13!07 SMM/PAG DRAFT CORRECTIONS 2 02/13/91 RIG WORKOVER 03/01/07 KSB/TLH GLV GO 07/17/01 RN/TP CORRECTIONS 11/05/05 ???/TLH CSG CORRECTIONS 02/10/07 JUE NORDtC-1 CTD SIDETRACK 02/12/07 /PAG DRAFT CORRECTIONS ~ PRUDHOE BAY UNfT WELL: G-24A PERMIT No: 206-082 API No: 50-029-21671-01 SEC 12, T11N, R13E BP Exploration (Alaska) ~ ~ ~ ; !! ;; ~ + , ', a ;~ ~. y FRANK H. MURKOWSK/ GOVERNOR f ~~~~ ~~~~++ ~t~~ ~ ~~+ a OLt~-7~ OII/ oisi/ Vrv-7 1~ 333 W. 7"' AVENUE, SUITE 100 COI~TSL'' RQA7`IO1~T CO1rI11TISSIOIQ `i ANCHORAGE, ALASKA 99501-3539 i~ PHONE (907) 279-1433 Sean McLaughlin FAx (so7) 27s-75x2 CT Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU G-24A BP Exploration (Alaska) Inc. Permit No: 206-082 Surface Location: 2703' FNL, 1974' FEL, SEC. 12, Tl 1N, R13E, UM Bottomhole Location: 2287' FNL, 1431' FEL, SEC. 13, Tl 1N, R13E, UM Dear Mr. McLaughlin: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) x,59-3607 (pager). DATED this~day of June, 2006 cc: Department of Fish 8v Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~i~~~~ STATE OF ALASKA b A~ OIL AND GAS CONSERVATION COMI~ION ~`~,y~ ~ ~ PERMIT TO DRILL 20 AAC 25.005 JUN 1 ~ 2006 Alaska Oil & Gas Cons. Commission 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class O Exploratory Q Development Gas Q Service ^ Multiple Zone Q Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is pro Q Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Numbe sleL~oL PBU G-24A 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12535 TVD 8958ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 2703' FNL 1974' FEL SEC 12 T11 N R13E UM 7. Property Designation: ADL 028285 Pool , , . , , , Top of Productive Horizon: ~ ~y~ ~ 354' FNL, 28' FWL, SEC. 18, T11 N, R~dE, UM g. Land Use Permit: 13. Approximate Spu ate: August 20, 006 Total Depth: 2287' FNL, 1431' FEL, SEC. 13, T11 N, R13E, UM 9. Acres in Property: 2560 14. Distance to Ne est Property: 15,000' 4b. Location of Well (State Base Pfane Coordinates): Surface: x- 658255 Y-5968946 Zone-ASP4 10. KB Elevation (Height above GL): 72.1 feet 15. Distance to Nearest Well Within Pool: 950' 16. Deviated Wells: Kickoff Depth: 10170 feet Maximum Hole Angle: 94 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3220 Surface: 2340 18. Casing Program: S ecifieatons To - Settin Depth -Bottom Quanti of Cement, c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 4-1 /8" 3-3116• x z-~ra° 6.2# / 6.16# L-80 TCI I / ST 2564' 9970' 8697' 12534 8958 157 cu ft Class 'G' 19. PRESENT WELL CONDITION SUMMARY (Ta be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 10475 Total Depth TVD (ft): 9147 Plugs (measured): None Effective Depth MD (ft): 10397 Effective Depth TVD {ft): 9090 Junk (measured): 10323 "Casing Length Size Cement Volume MD TVD Conductor /Structural 110' 20" 9 cu ds Concrete 110' 110' Surface 2693' 13-3/8" 3258 cu ft PF 'E', 465 cu ft PF 2693' 2693' Intermediate 9495' 9-5/8" 575 cu ft Class 'G' 9495' 8394' Production Liner 1264' 7" 383 cu ft Class 'G' 9209' - 10473' 8169' - 9146' Perforation Depth MD (ft): 10242' - 10360' Perforation Depth TVD (ft): 8975' - 9062' 20. Attachments ®Filing Fee, $100 ®BOP Sketch ®Drilling Program Q Time vs Depth Plot Q Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch Q Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Sean McLaughlin, 564-4387 Printed Name~n McLaughlin Title CT Drilling Engineer f~ j Prepared By NamelNumber: Si nature +~ v Phone 564-4387 Date b r~ ®6~ Terrie Hubble, 564-4628 -Commission Use`Only Permit To Drill Number: ~ ~ API Number: Permit Approv 50-029-21671-01-00 Date: • See cover letter for other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrat r gas contained shales Samples Req'd: ^ Yes ' ,No ud Log Req'd: ^ Yes No p , HZS Measures: ~Ye fl N recf al Survey Req'd: Yes ^ No Other: TeS-f' a0 ~~ ~ 3500 r ~'l. _ ~~./~~ PPROVED BY THE COMMISSIO Date I~ ,COMMISSIONER Form 10-401 Revised 12/2005 (1 C1 ~ ("~ l [~ i /~ ~ ~ ~ Submit In Duplicate BP • Prudhoe Bay G-24A CTD Sidetrack CTD Sidetrack Summary Pre-Rig Work: 1. O AC-LDS; AC-PPPOT-IC, T 2. E Set CIBP at 10270' 3. S Open sliding sleeve 4. S Run dummy whipstock drift 5. O Establish an injection rate 6. E Set cement retainer 7. C Pump 35 bbl or 15.8 ppg cement into IA and perforations 8. O MIT-IA 9. E Set WS at 10170' 10. O Bleed gas lift and production flowlines down to zero and blind flange 11. O Remove wellhouse, level pad The pre CTD work is slated to begin on June 1, 2006. Rig Work: 1. MIlZU and test BOPE to 250 psi low and 3500 psi high. ~ 2. Mi113.8" window at 10170'and of rathole. Swap the well to Flo-Pro. 3. Drill Build: 4.125" OH, 330' S eg/100 planned) .., ; 4. Drill Lateral: 4.125" OH, 2034 (12 deg/100 planned), with resistivity d 5. MAD pass with resistivity tools in memory mode 6. Run 3-3/16" 2-7/8" solid liner leaving TOL at 9970' ~ ~.. 7. Pump primary cement leaving TOC at 9970' ~- ~- 8. Cleanout liner and MCNL/GR/CCL log 9. Test liner lap to 2000 psi. O`er 10. Perforate liner per asset instructions (800') i 11. Freeze protect well, RDMO 0 Post-Rig Work: `~ 1. Move wellhouse, Install production flowline 2. Run GLVs 3. Flowback well to separator Mud Program: • Well kill: 8.6 ppg 'ne • Milling/drilling: ppg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4-1/8" Casing Program: fully cemented liner • 3-3/16", L-80 6.2# TCII 9970' and - 10550' and • 2-7/8", L-80 6. STL 10550'md - 12534'md • A minimum of 8 bls 15.8 ppg cement will be used for liner cementing. • TOC planned a 70' • • Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 90 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 15,000 ft. • Distance to nearest well within pool - 950 ft. (G-18A) Logging • MWD directional, Gamma Ray, and resistivity will be run over all of the open hole section. • A cased hole CNL/GR/CCL log will be run. Hazards • The maximum recorded H2S level on G pad is 20 ppm • Lost circulation risk is average, 2 fault crossings expected. Reservoir Pressure • The max res. press. is estimated to be 3220 psi at 8800's ppg EMW). • Max. surface pressure with gas (0.10 psi/ft) to surface 's 234 psi. E= 4"CAMERON WELLHEAD = McEVOY ACTUATOR = OT1S KB ELEV = 72.06' BF. ELEV = 35.91' KOP = 2900' Max Angle= 43 @ 10346' Datum MD = 10105' Datum TVD = 8800' SS • G -2 4 SA NOTES: 2110' 4-1/2" SSSV OTIS LNDNG NIP, ID = 3.813" 13-3/8" CSG, 72#, L-80, ID = 12.347" ~-~ 2692' Minimum ID = 3.725" @ 10278' 4-1/2" PARKER SWN NIPPLE TOP OF 7" LNR 9-5/8" CSG, 47#, L-80, ID = 8.681" ~ 9~ GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 2983 2911 5 MERLA DMY RA 0 04/03/94 4 4986 4685 35 MERLA DMY RA 0 04/03/94 3 6981 6288 35 MERLA DMY RA 0 04/03/94 2 8817 7791 38 MERLA DMY RA 0 04/03/94 1 9087 8002 39 MERLA DMY RA 0 04/03/94 9116' --i 4-1/2" PARKER SWS NIP, ID = 3.813" 9124' 9-5/8" x 4-1/2" TMI HBBP-R RET PKR W/LATCH, ID = 4.00" 9470' ~ 7" MARKER JOINT I I I 10216' 4-1/2" OTIS XA SLIDING SLV, ID = 3.813" 10230' TOP OF BLAST JOINTS 10264' BTM OF BLAST JOINTS 10265' 7" x 4-1/2" TNV HBBP PERM PKR, ID = 3.875" 10273' 4-1/2" PARKER SWS NIP, ID = 3.813" 10278' 4-1/2" PARKER SWN NIP, ID = 3.725" 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 10282' 10282' 4-1/2" TTL WLEG 10288' ELMD TT LOGGED 02/25/91 PERFORATION SUMMARY REF LOG: BHCS ON 12/16/86 ANGLE AT TOP PERF: 42 @ 10242' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OPWSOZ DATE 3-3/8" 4 10242 - 10268 O 02/06/87 3-3/8" 8 10284 - 10332 O 02/06/87 3-3/8" 4 10340 - 10360 O 02/25/91 PBTD ~ 10397' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 10475' 10323' I~ FISH -BOW SPRING LOST 02/11 /93 25" X 0.05" X 0.1875" DATE REV BY COMMENTS DATE REV BY COMMENTS 12/06/87 ORIGINAL COMPLETION 11/05/05 ???/TLH CSG CORRECTIONS 02/13/91 RIG WORKOV ER 07/17/01 RN/TP CORRECTIONS 11!01/01 WB/TP SURF LOC CORRECTION 02/26/03 CMO/KK MAX ANGLE CORRECTION 10/08/05 JPK/TLH GLV CORRECTION PRUDHOE BAY UNff WELL: G-24 PERMff No: 186-1830 API No: 50-029-21671-00 SEC 12, T11 N, R13E BP Exploration (Alaska) TREE= 4"CAMERON WELLHEAD= McEVOY ACTUATOR = OTIS KB. ELEV = 72.06' BF. ELEV = 35.91' KOP = 2900' Max Angle = 43 ~ 10346' Datum MD = 10105' Datum ND = 8800' SS ~ 13-3/8" CSG, 72#, L-80, ID = 12.347" ~ TOP OF CMT ~ 91 24' TOP OF 7" LNR 9209 9-5/8" CSG, 47#, L-80, ID = 8.681" 9495 Mechanical Whipstock ~ 10170' Cement Retainer 10200' PERFORATION SUMMARY REF LOG: BRCS ON 12/16/86 ANGLE AT TOP PERF: 42 Q 10242' Note: Refer to Production DB for historical pert data S¢E SPF INTERVAL OPWSOZ DATE 3-3/8" 4 10242- 10268 is~-~~,a'ed oroi~:- 3-3/8" 8 10284 - 10332 isoiair~d pros: 3-3/8" 4 10340 - 10360 isolated props ID = 3.958" ~~ 10282' PBTD 10397' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 10475' GAS LIFT MANDRELS ST MD ND DEV NPE VLV LATCH PORT DATE 5 2983 2911 5 MERLA DMY RA 0 04/03/94 4 4986 4685 35 MERLA DMY RA 0 04/03/94 3 6981 6288 35 MERLA DMY RA 0 04/03/94 2 8817 7791 38 MERLA DMY RA 0 04/03/94 1 9087 8002 39 MERLA DMY RA 0 04/03/94 16~~ 4-1/2" PARKER SWS NP, ID = 3.813" 24' 9-5/8" x 4-1 /2" TNV HBBP-R RET PKR W/LATCH, ID = 4.00" 7~ 7" MARKER JOINT 9960' Liner Top Packer 9970' Top o' 3-t%2" Liner. TOC 9980' ~- 1 /2" XN NIP.. ID = 2.75" 3-3/16 x 2-718 X-over i''i ~ 3~3: ~ . ,ted X '~?~8 N-a ,iiezi ~ 12534' O O 10216' 4-1 /2" OTIS XA SLIDING SLV, ID = 3.813" 10230' TOP OF BLAST JOINTS 10265' ~ 7" x 4-1 /2" TNV HBBP PERM PKR, ID = 3.875" 10270' CIBP 10273' 4-1/2" PARKER SWS NP, ID = 3.813" 102 4-1/2" PARKER SWN NP. ID= 3.725" 10282' ~ a-v2° rn wLEG ~ 10288' ELMD TT LOGGED 02/25/91 10323' FISH -BOW SPRING LOST 02/11 /93 25" X 0.05" X 0.1875" DATE REV BY CONfTAENTS DATE REV BY COMMENTS 12/06187 06i61NAL COMPLETION 11/05/05 ???/TLH CSG CORRECTIONS 02/13191 iiG WORKOVER 07/17/01 RNITP CORRECTIONS 11/01/01 WB/Ti= SURF LOC CORRECTION 02/26/03 CMOIKK X A NGLE CORRECTION 10/08/05 JPKlrLFF GLV CORRECTION PRUDHOE BAY UNfr WELL: G-24 PERMR No: 186-1830 AR No: 50-029-21671-00 SEC 12, T11 N, R13E BP Exploration (Alaska) G -2 4 A SAFELY NOTES: Proposed CTD Sidetrack 2110' 4-1/2" SSSV OTIS LNDNG NP, ID= 3.813" '~1~ "N Hughes INTEQ Planning ewvesea u.,~~ Company: BP Amato Date: d/29/200ti Time: 19:40:06. Page: ' 1 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: G-24, True North Site: PB G Pad. Vertical (TVD) Reference:. 30 ' 24 1 2/511 988.00:00 72.1 Well: G-24 Sectioq(VS) Reference: Well (O.OON;O.OOE,21 O.OOAzi) Wellpath: PIan2, G-24A Survey Calculation Methods Minimum Curvature ' Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map Systero:US State Plane Coordinate System 1927 Map Zooe: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Site: PB G Pad TR-11-13 UNITED STATES :North Slope Site Position: Northing: 5966832.87 ft Latitude: 70 18 58.211 N From: Map Easting: 656301.39 ft Longitude: 148 43 59.013 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.19 deg Well: G-24 Slot Name: G-24 Well Position: +N!-S 2072.15 ft Northing: 5968946.00 ft Latitude: 70 19 18.588 N +E/-W 1997.32 ft Easting : 658255.00 ft Longitude: 148 43 0.723 W Position Uncertainty: 0.00 ft Wellpath: PIan2, G-24A Drilled From: G-24 Tie-on Depth: 10161.85 ft Current Datum: 30:24 12/5/1986 00 :00 Height 72.10 ft Above System Datum: Mean Sea Level Magnetic Data: 4/29/2006 Declination: 24.53 deg Field Strength: 57605 nT Mag Dip Angle: 80.90 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 36.19 0.00 0.00 210.00 Ptan: Plan #2 Date Composed: 4/29/2006 Copy Lamar's plant Version: 3 Principal: Yes Tied-to: From: Definitive Path Targets Name Description Dip.. Dir. TVD ft +NI: S ft +E/-W ft Map Northing: ft Map Fasting ft <~- Latitude - Deg Min. Sec --> <- Longitude --> Deg: Miu -Sec G-24A Polygon 72.10 -3670.27 2048.22 5965320.00 660380.00 70 18 42.489 N 148 42 0.977 W -Polygon i 72.10 -3670.27 2048.22 5965320.00 660380.00 70 18 42.489 N 148 42 0.977 W -Polygon 2 72.10 -3858.34 1954.22 5965130.00 660290.00 70 18 40.639 N t48 42 3.720 W -Polygon 3 72.10 -4460.85 1116.27 5964510.00 659465.00 70 18 34.715 N 148 42 28.164 W -Polygon 4 72.10 -5052.58 478.61 5963905.00 658840.00 70 18 28.896 N 148 42 46.764 W -Polygon 5 72.10 -4914.12 316.48 5964040.00 658675.00 70 18 30.258 N 148 42 51.492 W -Polygon 6 72.10 -4251.03 890.63 5964715.00 659235.00 70 18 36.779 N 148 42 34.745 W -Polygon 7 72.10 -3577.90 1700.06 5965405.00 660030.00 70 18 43.398 N 148 42 11.132 W -Polygon 8 72.10 -3670.27 2048.22 5965320.00 660380.00 70 18 42.489 N 148 42 0.977 W G-24A Fauttl 72.10 -4193.83 786.81 5964770.00 659130.00 70 18 37.342 N 148 42 37.773 W -Polygon 1 72.10 -4193.83 786.81 5964770.00 659130.00 70 18 37.342 N 148 42 37.773 W -Polygon 2 72.10 -4365.87 1118.28 5964605.00 659465.00 70 18 35.649 N 148 42 28.106 W -Polygon 3 72.10 -4396.70 1157.64 5964575.00 659505.00 70 18 35.346 N 148 42 26.958 W -Polygon 4 72.10 -4365.87 1118.28 5964605.00 659465.00 70 18 35.649 N 148 42 28.106 W G-24A Fault3 72.10 -3242.74 1697.13 5965740.00 660020.00 70 18 46.694 N 148 42 11.215 W -Polygon 1 72.10 -3242.74 1697.13 5965740.00 660020.00 70 18 46.694 N 148 42 11.215 W -Polygon 2 72.10 -3307.79 1935.83 5965680.00 660260.00 70 18 46.054 N 148 42 4.252 W G-24A Fault2 72.10 -4582.29 708.59 5964380.00 659060.00 70 18 33.521 N 148 42 40.056 W -Polygon 1 72.10 -4582.29 708.59 5964380.00 659060.00 70 18 33.521 N 148 42 40.056 W -Polygon 2 72.10 -4766.84 684.69 5964195.00 659040.00 70 18 31.706 N 148 42 40.753 W -Polygon 3 72.10 -5505.47 609.10 5963455.00 658980.00 70 18 24.442 N 148 42 42.959 W -Polygon 4 72.10 -4766.84 684.69 5964195.00 659040.00 70 18 31.706 N 148 42 40.753 W G-24A Fault4 72.10 -4203,33 1711.88 5964780.00 660055.00 70 18 37.247 N 148 42 10.791 W -Polygon 1 72.10 -4203.33 1711.88 5964780.00 660055.00 70 18 37.247 N 148 42 10.791 W -Polygon 2 72.10 -4745.42 2040.54 5964245.00 660395.00 70 18 31.915 N 148 42 1.209 W G-24A Fault6 72.10 -4197.33 241.57 5964755.00 658585.00 70 18 37.308 N 148 42 53.676 W -Polygon 1 72.10 -4197.33 241.57 5964755.00 658585.00 70 18 37.308 N 148 42 53.676 W -Polygon 2 72.10 -4572.34 473.73 5964385.00 658825.00 70 18 33.620 N 148 42 46.905 W N ~er Hughes INTEQ Planning ~ort INTEQ Company:: BP Amoco Date: 4/29/2006 Time: 19:40:06 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference:. Well: G24, True North Site: PB G Pad VertieaL(TVD) References 30:2412/5/1986 00:00 72.1 Well: G24 Section (VS) Reference:. Well (O.OON`,O.OOE,210.OOAzi) Wellpath; Plant, G-24A Survey. Calculation Method:. Minimum. Curvature I)b: Oracle Targets Map Map ~-- Latitude --> <--- Longitude -> Name Description TVD +N/-S +E/ W Northing : Easting Deg Mia ` Sec Deg Min See Dip.. Dir. ft ft ft ft ft G-24A Faults 72.10 -4547.10 1174.47 5964425.00 659525.00 70 18 33.867 N 148 42 26. 467 W -Polygon 1 72.10 -4547.10 1174.47 5964425.00 659525.00 70 18 33.867 N 148 42 26. 467 W -Polygon 2 72.10 -5226.75 1385.20 5963750.00 659750.00 70 18 27.182 N 148 42 20. 325 W G-24A Target3 9031.10 -4863.90 543.61 5964095.00 658901.00 70 18 30.752 N . 148 42 44. 868 W G-24A Target2 9038.10 -3651.71 1879.56 5965335.00 660211.00 70 18 42.672 N 148 42 5. 896 W G-24A Targetl 9044.10 -3503.19 2046.74 5965487.00 660375.00 70 18 44.132 N 148 42 1. 018 W Annotation MD TVD ft ft 10161.85 8914.64 TIP 10170.00 8920.78 KOP 10190.00 8935.63 End of 9 Deg/100' DLS 10230.00 8962.38 4 10474.84 9044.04 End of 25 Deg/100' DLS 10549.84 9041.10 6 10624.84 9037.92 7 10734.84 9037.22 8 11034.84 9035.45 9 11334.84 9034.03 10 11634.84 9032.87 11 11775.00 9032.41 Faultl 11934.84 9031.94 12 12234.84 9031.19 13 12375.00 9030.88 Faultl 12534.84 9030.57 TD Plan Section Information MD Incl Azim TVD +N/-S +E/-W DLS Build Turn. TFO Target ft deg deg ft ft ft . deg/100ft deg/f 00ft deg/100ft deg. 10161.85 41.12 163.56 8914.64 -3244.17 2083.19 0.00 0.00 0.00 0.00 10170.00 41.16 163.55 8920.78 -3249.31 2084.71 0.50 0.49 -0.12 350.65 .10190.00 42.96 163.55 8935.63 -3262.16 2088.51 9.00 9.00 0.00 0.00 10230.00 52.96 163.55 8962.38 -3290.61 2096.91 25.00 25.00 0.00 0.00 10474.84 90.00 216.44 9044.04 -3503.46 2047.03 25.00 15.13 21.60 65.50 10549.84 94.49 224.25 9041.10 -3560.52 1998.56 12.00 5.98 10.41 60.00 10624.84 90.37 232.26 9037.92 -3610.35 1942.71 12.00 -5.49 10.68 117.00 10734.84 90.36 245.46 9037.22 -3667.10 1848.76 12.00 -0.01 12.00 90.00 11034.84 90.29 209.46 9035.45 -3866.60 1631.33 12.00 -0.02 -12.00 270.00 11334.84 90.24 245.46 9034.03 -4066.10 1413.90 12.00 -0.02 12.00 90.00 11634.84 90.19 209.46 9032.87 -4265.59 1196.47 12.00 -0.01 -12.00 270.00 1.1934.84 90.15 245.46 9031.94 -4465.09 979.03 12.00 -0.01 12.00 90.00 12234.84 90.12 209.46 9031.19 -4664.59 761.60 12.00 -0.01 -12.00 270.00 12534.84 90.10 245.46 9030.57 -4864.09 544.17 12.00 -0.01 12.00 90.00 Survey MD Inel ` Azim Sys TVD N/S E/W MapN MapE l)LS VS TFO Toole , ft deg. deg ft ft ft ft ft deg1t00ft ft deg 10161.85 41.12 163.56 8842.54 -3244.17 2083.19 5965746.71 660405.98 0.00 1767.93 0.00 MWD 10170.00 41.16 163.55 8848.68 -3249.31 2084.71 5965741.60 660407.61 0.50 1771.63 350.65 MWD 10190.00 42.96 163.55 8863.53 -3262.16 2088.51 5965728.84 660411.67 9.00 1780.86 0.00 MWD 10200.00 45.46 163.55 8870.70 -3268.85 2090.48 5965722.19 660413.79 25.00 1785.66 0.00 MWD 10220.00 50.46 163.55 8884.08 -3283.09 2094.68 5965708.04 660418.29 25.00 1795.89 0.00 MWD 10230.00 52.96 163.55 8890.28 -3290.61 2096.91 5965700.57 660420.67 25.00 1801.30 0.00 MWD 10240.00 54.03 166.36 8896.23 -3298.38 2098.99 5965692.85 660422.92 25.00 1806.98 65.50 MWD 10260.00 56.36 171.75 8907.65 -3314.49 2102.10 5965676.81 660426.36 25.00 1819.38 63.83 MWD 10280.00 58.91 176.85 8918.36 -3331.29 2103.76 5965660.05 660428.38 25.00 1833.10 60.75 MWD 10300.00 61.64 181.67 8928.28 -3348.65 2103.98 5965642.70 660428.96 25.00 1848.02 58.02 MWD 10320.00 64.54 186.24 8937.34 -3366.43 2102.74 5965624.90 660428.10 25.00 1864.04 55.63 MWD N ~er Hughes INTEQ Planning ~ort iNTEQ ~~ Company: BP Amoco Date: 4/29/2006: Time: 19:40:06 Page: 3 Field:: Prudhoe Bay Co-ordinate(NE) Reference: Well: G-24, True North Site: PB G Pad Vertical ('I'VD) Reference::. 30:2412/5/1986.00:00 72.1 Well: G-24 Section (VS) Reference: Wetl (O.OON, O.OOE,210.OOAzi) Wellpath: PIa n2, G-24A Survey Calculation Method: Minimum Curvature 1)b: Oracle Survey MD Iact Azim Sys TVD N/S E/W MapN MapE DLS VS TFO Tool ft deg deg: ft ft ft ft ft deg/100ft ft deg 10340.00 67.58 190.59 8945.45 -3384.50 2100.06 5965606.77 660425.80 25.00 1881.04 53.56 MWD 10360.00 70.72 194.75 8952.58 -3402.73 2095.96 5965588.46 660422.09 25.00 1898.87 51.79 MWD 10380.00 73.96 198.75 8958.64 -3420.97 2090.46 5965570.11 660416.98 25.00 1917.42 50.31 MIND 10381.29 74.17 199.00 8959.00 -3422.15 2090.06 5965568.93 660416.60 25.00 1918.64 49.09 G-24A T 10400.00 77.26 202.62 8963.62 -3439.09 2083.62 5965551.86 660410.52 25.00 1936.53 49.02 MWD 10411.69 79.22 204.84 8966.00 -3449.57 2079.01 5965541.28 660406.13 25.00 1947.91 48.13 G-24A T 10420.00 80.62 206.39 8967.45 -3456.94 2075.47 5965533.84 660402.75 25.00 1956.06 47.68 MWD 10440.00 84.03 210.09 8970.12 -3474.39 2066.10 5965516.19 660393.75 25.00 1975.87 47.41 MWD 10460.00 87.45 213.74 8971.61 -3491.32 2055.55 5965499.05 660383.56 25.00 1995.79 46.91 MWD 10474.84 90.00 216.44 8971.94 -3503.46 2047.03 5965486.74 660375.29 25.00 2010.57 46.64 MWD 10500.00 91.51 219.06 8971.61 -3523.34 2031.63 5965466.53 660360.32 12.00 2035.49 60.00 MWD 10525.00 93.01 221.66 8970.63 -3542.38 2015.45 5965447.16 660344.55 12.00 2060.06 60.03 MWD 10549.84 94.49 224.25 8969.00 -3560.52 1998.56 5965428.67 660328.05 12.00 2084.22 60.14 MWD 10575.00 93.11 226.94 8967.34 -3578.08 1980.63 5965410.73 660310.49 12.00 2108.39 117.00 MWD 10600.00 91.74 229.61 8966.28 -3594.70 1961.99 5965393.72 660292.21 12.00 2132.11 117.18 MWD 10624.84 90.37 232.26 8965.82 -3610.35 1942.71 5965377.67 660273.26 12.00 2155.30 117.29 MWD 10650.00 90.37 235.28 8965.66 -3625.22 1922.41 5965362.38 660253.28 12.00 2178.32 90.00 MWD 10675.00 90.37 238.28 8965.50 -3638.91 1901.50 5965348.25 660232.67 12.00 2200.64 90.02 MWD 10700.00 90.37 241.28 8965.34 -3651.49 1879.90 5965335.22 660211.34 12.00 2222.33 90.04 MWD 10725.00 90.36 244.28 8965.18 -3662.92 1857.67 5965323.32 660189.36 12.00 2243.35 90.06 MWD 10734.84 90.36 245.46 8965.12 -3667.10 1848.76 5965318.96 660180.54 12.00 2251.42 90.08 MWD 10750.00 90.36 243.64 8965.02 -3673.62 1835.08 5965312.16 660166.99 12.00 2263.91 270.00 MWD 10775.00 90.36 240.64 8964.87 -3685.30 1812.98 5965300.01 660145.15 1.2.00 2285.07 269.99 MWD 10800.00 90.36 237.64 8964.71 -3698.12 1791.52 5965286.75 660123.96 12.00 2306.90 269.97 MWD 10825.00 90.35 234.64 8964.55 -3712.04 1770.76 5965272.39 660103.50 12.00 2329.34 269.95 MWD 10850.00 90.35 231.64 8964.40 -3727.03 1750.76 5965256.98 660083.83 12.00 2352.33 269.93 MWD 10875.00 90.34 228.64 8964.25 -3743.05 1731.57 5965240.56 660064.98 12.00 2375.80 269.91 MWD 10900.00 90.34 225.64 8964.10 -3760.06 1713.24 5965223.17 660047.02 12.00 2399.68 269.90 MWD 10925.00 90.33 222.64 8963.95 -3777.99 1695.84 5965204.87 660029.99 12.00 2423.92 269.88 MWD 10950.00 90.32 219.64 8963.81 -3796.82 1679.39 5965185.71 660013.95 12.00 2448.45 269.86 MWD 10975.00 90.32 216.64 8963.67 -3816.48 1663.95 5965165.73 659998.93 12.00 2473.19 269.84 MWD 11000.00 90.31 213.64 8963.54 -3836.92 1649.56 5965144.99 659984.97 12.00 2498.09 269.83 MWD 11025.00 90.30 210.64 8963.40 -3858.08 1636.26 5965123.55 659972.13 12.00 2523.07 269.81 MWD 11034.84 90.29 209.46 8963.35 -3866.60 1631.33 5965114.93 659967.38 12.00 2532.91 269.79 MWD 11050.00 90.29 211.28 8963.28 -3879.68 1623.67 5965101.70 659959.99 12.00 2548.06 90.00 MWD 11075.00 90.29 214.28 8963.15 -3900.69 1610.13 5965080.40 659946.90 12.00 2573.03 80.01 MWD 11100.00 90.29 217.28 8963.02 -3920.97 1595.52 5965059.82 659932.72 12.00 2597.90 90.02 MWD 11125.00 90.29 220.28 8962.90 -3940.46 1579.86 5965040.01 659917.48 12.00 2622.61 90.04 MWD 11150.00 90.28 223.28 8962.77 -3959.10 1563.21 5965021.03 659901.22 12.00 2647.08 90.05 MWD 11175.00 90.28 226.28 8962.65 -3976.84 1545.60 5965002.92 659883.99 12.00 2671.25 90.07 MWD 11200.00 90.27 229.28 8962.53 -3993.64 1527.09 5964985.74 659865.84 12.00 2695.05 90.08 MWD 11225.00 90.27 232.28 8962.41 -4009.44 1507.72 5964969.53 659846.81 12.00 2718.42 90.10 MWD 11250.00 90.26 235.28 8962.30 -4024.21 1487.55 5964954.34 659826.96 12.00 2741.29 90.11 MV11D 11275.00 90.26 238.28 8962.18 -4037.90 1466.64 5964940.21 659806.35 12.00 2763.61 90.13 MWD 11300.00 90.25 241.28 8962.08 -4050.48 1445.04 5964927.17 659785.02 12.00 2785.30 90.14 MWD 11325.00 90.24 244.28 8961.97 -4061.92 1422.81 5964915.28 659763.04 12.00 2806.32 90.15 MWD 11334.84 90.24 245.46 8961.93 -4066.10 1413.90 5964910.91 659754.22 12.00 2814.39 90.17 MWD 11350.00 90.24 243.64 8961.87 -4072.61 1400.21 5964904.11 659740.67 12.00 2826.88 270.00 MWD 11375.00 90.23 240.64 8961.76 -4084.29 1378.11 5964891.97 659718.82 12.00 2848.04 269.99 MWD 11400.00 90.23 237.64 8961.66 -4097.11 1356.65 5964878.70 659697.64 12.00 2869.87 269.98 MWD 11425.00 90.23 234.64 8961.56 -4111.04 1335.90 5964864.34 659677.18 12.00 2892.31 269.97 MWD 11450.00 90.23 231.64 8961.46 -4126.03 1315.89 5964848.93 659657.50 12.00 2915.30 269.96 MWD 11475.00 90.23 228.64 8961.36 -4142.05 1296.70 5964832.51 659638.66 12.00 2938.77 269.94 MWD 11500.00 90.22 225.64 8961.26 -4159.05 1278.38 5964815.13 659620.70 12.00 2962.65 269.93 MWD 11525.00 90.22 222.64 8961.17 -4176.99 1260.97 5964796.83 659603.67 12.00 2986.89 269.92 MWD 11550.00 90.21 219.64 8961.07 -4195.81 1244.52 5964777.66 659587.62 12.00 3011.42 269.91 MWD 11575.00 90.21 216.64 8960.98 -4215.47 1229.08 5964757.68 659572.60 12.00 3036.16 269.90 MWD 11600.00 90.20 213.64 8960.89 -4235.91 1214.70 5964736.95 659558.65 12.00 3061.06 269.89 MWD .~N ~er Hughes INTEQ Planning ~ort I.1\,TE ~a Company: BP Amoco Dste: 4/29/2006 Time: ' 19:40:06 - Page: 4 Field:. Prudhoe Bay Co-ordiuate(NE) Refereuce' WE±II: G-24, True iVorth Site: PB G Pad Vertical (TVD) Reference; 30 :.2412/5/1986 00:00 72.1 Well: G-24 Section (VS) Reference: Weil (O.OOfV, 0.0UE,210.00Azi) Wellpath: PIa n2, G-24A Survey Calculation Method: Minimum Curvature bb: Oracle Survey MD Iucl Azim Sys TVD N/S E/W MapN MapE DLS VS TFQ Tool ft deg deg ft ff R ft ft deg/100ft ft deg 11625.00 90.19 210.64 8960.81 -4257.08 1201.40 5964715.51 659545.80 12.00 3086.04 269.88 MWD 11634.84 90.19 209.46 8960.77 -4265.59 1196.47 5964706.89 659541.05 12.00 3095.88 269.87 MWD 11650.00 90.19 211.28 8960.72 -4278.67 1188.80 5964693.65 659533.67 12.00 3111.04 90.00 MWD 11675.00 90.19 214.28 8960.64 -4299.69 1175.27 5964672.36 659520.58 12.00 3136.00 90.01 MWD 11700.00 90.19 217.28 8960.56 -0319.97 1160.65 5964651.78 659506.40 12.00 3160.87 90.02 MWD 11725.00 90.19 220.28 8960.48 -4339.45 1145.00 5964631.97 659491.15 12.00 3185.58 90.03 MWD 11750.00 90.19 223.28 8960.40 -4358.09 1128.34 5964612.98 659474.90 12.00 3210.05 90.04 MWD 11775.00 90.18 226.28 8960.31 -4375.84 1110.73 5964594.87 659457.67 12.00 3234.22 90.05 MWD 11800.00 90.18 229.28 8960.24 -4392.63 1092.22 5964577.69 659439.52 12.00 3258.02 90.06 MWD 11825.00 90.18 232.28 8960.16 -4408.44 1072.85 5964561.48 659420.49 12.00 3281.39 90.06 MWD 11850.00 90.17 235.28 8960.08 -4423.21 1052.69 5964546.29 659400.64 12.00 3304.27 90.07 MWD 11875.00 90.17 238.28 8960.01 -4436.90 1031.77 5964532.16 659380.02 12.00 3326.58 90.08 MWD 11900.00 90.16 241.28 8959.94 -4449.48 1010.17 5964519.13 659358.69 12.00 3348.28 90.09 MWD 11925.00 90.16 244.28 8959.87 -4460.91 987.94 5964507.23 659336.71 12.00 3369.29 90.10 MWD 11934.84 90.15 245.46 8959.84 -4465.09 979.03 5964502.86 659327.89 12.00 3377.37 90.11 MWD 11950.00 90.15 243.64 8959.80 -4471.61 965.35 5964496.06 659314.34 12.00 3389.85 270.00 MWD 11975.00 90.15 240.64 8959.73 -4483.29 943.25 5964483.92 659292.50 12.00 3411.02 270.00 MWD 12000.00 90.15 237.64 8959.67 -4496.11 921.79 5964470.65 659271.31 12.00 3432.85 269.99 MWD 12025.00 90.15 234.64 8959.60 -4510.03 901.03 5964456.29 659250.86 12.00 3455.29 269.98 MWD 12050.00 90.15 231.64 8959.53 -4525.03 881.03 5964440.88 659231.18 12.00 3478.27 269.97 MWD 12075.00 90.15 228.64 8959.47 -4541.05 861.84 5964424.46 659212.33 12.00 3501.74 269.96 MWD 12100.00 90.15 225.64 8959.41 -4558.05 843.51 5964407.08 659194.37 12.00 3525.63 269.96 MWD 12125.00 90.14 222.64 8959.34 -4575.98 826.10 5964388.78 659177.34 12.00 3549.87 269.95 MWD 12150.00 90.14 219.64 8959.28 -4594.81 809.66 5964369.61 659161.30 12.00 3574.39 269.94 MWD 12175.00 90.14 216.64 8959.22 -4614.47 794.22 5964349.63 659146.28 12.00 3599.14 269.93 MWD 12200.00 90.13 213.64 8959.16 -4634.91 779.83 5964328.90 659132.32 12.00 3624.03 269.93 MWD 12225.00 90.13 210.64 8959.11 -4656.07 766.53 5964307.46 659119.47 12.00 3649.01 269.92 MWD 12234.84 90.12 209.46 8959.09 -4664.59 761.60 5964298.84 659114.73 12.00 3658.86 269.91 MWD 12250.00 90.12 211.28 8959.05. -4677.67 753.94 5964285.60 659107.34 12.00 3674.01 90.00 MWD 12275.00 90.12 214.28 8959.00 -4698.69 740.40 5964264.31 659094.25 12.00 3698.98 90.00 MWD 12300.00 90.12 217.28 8958.94 -4718.96 725.79 5964243.73 659080.07 12.00 3723.85 90.01 MWD 12325.00 90.12 220.28 8958.89 -4738.45 710.13 5964223.92 659064.83 12.00 3748.55 90.02 MWD 12350.00 90.12 223.28 8958.84 -4757.09 693.47 5964204.93 659048.57 12.00 3773.02 90.02 MWD 12375.00 90.12 226.28 8958.78 -4774.83 675.86 5964186.82 659031.34 12.00 3797.19 90.03 MWD 12400.00 90.12 229.28 8958.73 -4791.63 657.35 5964169.64 659013.19 12.00 3821.00 90.04 MWD 12425.00 90.11 232.28 8958.68 -4807.43 637.99 5964153.43 658994.16 12.00 3844.37 90.04 MWD 12450.00 90.11 235.28 8958.63 -4822.20 617.82 5964138.24 658974.31 12.00 3867.24 90.05 MWD 12475.00 90.11 238.28 8958.58 -4835.90 596.91 5964124.11 658953.69 12.00 3889.56 90.05 MWD 12500.00 90.11 241.28 8958.54 -4848.48 575.31 5964111.08 658932.36 12.00 3911.25 90.06 MWD 12525.00 90.10 244.28 8958.49 -4859.91 553.08 5964099.18 658910.38 12.00 3932.27 90.07 MWD 12534.84 90.10 245.46 8958.47 -4864.09 544.17 5964094.81 658901.56 12.00 3940.34 90.07 3.50" • a 3aaa '+~~:r { ~F Fs ~~--~ ~~ ~ Q ~~ ~~e~ ~R ~~ a W r~ t 4- [~ ~$ ~~ 1 ,..,. , , ,.._ ,_.T_r.~ (ulp~pp l) )')4UON/)')47no$ 1 `~~ Y a ~~ ~ !~€~g9 ~ s N '~ ; 8 ~~~~9 < u~ Q g . u= ~R _.. o 3n. ~ ~ ~~gr~ e e a b I ~ aaa~~ Q m ae ~~ ~~' ~ e~~~~ 34 ~ > ~s 8' ~ ~ .. ~~;/. /~ ~~ ;~ '~ i.: I • • ents are i N ~_ ~ G-24A bag BAG 7 1/16" 5000 psi. bttm of bag slips of pipes cross of blind/shears Blind/Shears TOTs ~ 2 3/8" combi ram/slips ~ ~ x/16" 5ooopsi Mud Cross I I Mud Cross 7 1/16" 5000psi variable bore pipe 3 1/2"-2 3/8" _ TOTs 2 3/8" combi ram/slips ~ ~ 1/16" 5ooopsi Flow Tee • • TERRIE L 1-~UBBEE ss-snz5z 277 BP EXPLORATION AK IN£ ., PO BOX 196612 MB 7-5 Mastercard Check ANCHORAGE, AK 99519-661:2. ®~~ ~3 DATE PAY TO THE ; ~ /'1~ .ORDER OF (J t First Natioria ank Alaska. Anchorage, AK 99u501 MEMO' ~ L~ ~ , ~. ~: L 2 5 2 0 0 0 6 0 ~: 9 9 L 4 ~~~ 6 2 2 7 ~~~ 1 5 5 6 ~~• 0 2 7 7 • TRANSMITTAL LETTER CHECKLIST WELL NAME ~ ~ ,~ ~~~ PTD# ~C3~ ~~ ~' 2 Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS ! TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing i wel l (If last two digits in permit No. API No. 50- - - API number are , ~ between 60-69) ;Production should continue to be reported as a function of the original API number stated above. j PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH} and API number (50- - -) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for (name of welly until after (Com~an NameZhas designed and implemented a water well testing program to provide baseline data on water quality and quantity. _(Company Name) must contact the Commission to obtain advance approval of such water well testing rogram. Rev: 1 /25106 C:\jody\transmittal_checklist -z ___ ~ s .... ~ ~ s.____a_ _.__~_ __-_ WELL PERMIT c:HECKi~IST Field & Pool PRUDHOE BAY PRUDHOE OIL 640150 _ Well Name: PRUDHOE BAY UNIT G-24A_ _ Program DEV _ _ _ Well bore seg PTD#:2060820 Company BP EXPLORATION (FL4SItAj_INC Initial Class/Type DEV / 1-01L GeoArea 890 Unit 11650 On(Off Shore On Annular Disposal Administration 1 Permit fee attached Yes - '2 Lease number appropdate Yes 3 Unique well name and number Yes ~4 Well located in a-defined pool_ Yes '5 Well located proper distance-from. drillingunii.boundary- Yes '6 Well located proper distance from-other wells- Yes ',7 Sufficient acreage available in drilling unit. _ - - _ .. _ - - Yes 8 If deviated, is wellbore platincluded Yes - ',9 Operator only affected party- - - - Yes - ',10 Operator has appr_opriate_bond in force - - _ Yes - '11 Permit can be issued without conservatign order. . - - - _ - Yes - 112 Permit can be issued without administrative approya_I _ _ . - Yes - Appr Date 1,13 -Can permit be approved before 15-daywait_ - - _ . - Yes - - RPC 6!1512006 ' 14 Well located within area and strata authorized by-Injection Order # (put 10# in.comments)_(For- NA- - - - ,15 All wells within 114 mile area_of review dented (For service well only) NA_ - 16 -Pre-produced injector; duration of pre production less than 3 months (For_senri_ce well. only) - NA- - j17 Nonconven,gas.conformstoAS31,05:030O.1,A),Q,2.A-Dj - - - _ . NA- - - 18 Canductorstring_provided NA . . __ Engineering ,,19 Surface casing protects all known USDWs - NA . 20 CMT vot adeguate_to circulate on conductor_$ surf cs9 NA- 1,21 CMTvotadequatetotie-m_longstringtosurfcsg_ _ NA- - 22 CMT will coverall known productive horizons- . - . - Yes . . Adequate excess. ',23 Casing designs adequate for C, T B &. permafrost Yes . I24 Adequate tankage_or reserve pit - - - - Yes . . CTDU., !25 If a-re-drill, has a 10-403 for abandonment been approved Yes - - - - 5116!2006. 126 Adequate wellbore separationproposed- . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes 27 If diverter required, does it meet regulations- - , .. - - . - - - - - _NA- Sidetrack. ',28 Drilling fluid program schematic & equip list adequate. , Yes - - - ..Max MW 8.6 ppg. Appr Date 1129 BOPEs, do they meet regulation _ _ Yes _ WGA 6119!200 !,30 BOPE_press rating appropriate; test to_(put psig in comments). Yes - - Test to 3500-psi. _MSP 2340 psi, 1131 Choke-manifgld complieswlAPI_RP-53 (May 84) . . . . . . . . . . . . .. . . .. . . . . . . . Yes _ ',32 Work will occur without operation shutdown. _ - - _ _ - _ _ - - - - -- - - - - - - - - _ _ Yes _ _ _ _ _ _ _ - _ - 133 Is presence-of H2S gas probable - No_ _ 20 ppm-max-on pad.. 34 Mechanical-condition of wells within AOR yerifed (Forservlce well only) - - - - .. - NA_ - - __ - -- I-- I35 -- -. _---- --- ---- - - -- - ---- Permit can be issued wlq hydrogen sulfide measures - No. -_- _ - - -- -- - --- - --- Geology I36 .Data presented on-potential overpressure zones IJA. - - - ~37 Seismic analy&is of shallow gas zones - . - _ _ - . _ _ NA- - - _ - Appr Date 1,38 1 Seabed condition survey-(ifoff-shore) . _ - _ ... - _ . -------------- NA_ _ RPC 611512006 1, 39 .Contact namelphone for weekly_progress reports_(exploratoryon1y] , , - - _ . - . _ _ - NA_ - Geologic Engineering.. Date: Date Date ~~ issioner: ~~ ~ ~~ ~ ~oner: ~ ~ ! ~~j i i r ~^l ~ ~ D~ Well I-iistory File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Wetl History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. • • **** REEL HEADER **** MWD 08/08/06 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 07/01/28 1292115 01 3.0" CTK *** LIS COMMENT RECORD *** !'!!!!!!!! !!!!!!!~! Remark File Version 1.000 !!!!!!!!!! !!!!!!!!! Extract File: ldwg.las Version I nformation VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20 WRAP. N0: One line per frame Well Information Block #MNEM.UNIT Data Type Information STRT.FT 9476.0000: Starting Depth STOP.FT 12380.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: G-24A FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 19' 18.588"N 148 deg 43' 0.723"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 28 Jan 2007 API API NUMBER: 500292167101 Parameter Information Block #MNEM.UNIT Value Description SECT. 12 Section TOWN.N T11N Township RANG. R13E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF DF Log Measured from FAPD.F 72.1 Feet Above Perm. Datum DMF DF Drilling Measured From EKB .F 0 Elevation of Kelly Bushing EDF .F 72.1 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level CASE.F N/A Casing Depth OS1 DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. ~~-o~~ t~-i~a ~ ~ (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log provided by Schlumberger GR CNL dated 02 Jan 2007 per Mike McTeague with BP Exploration (Alaska), Inc. (8) Tied to G-24A at 110162 feet MD (8842.54 feet TVDSS). (9) The sidetrack was drilled from G-24 through a milled window in a 7 inch liner. Top of window 10181 ft.MD (8857 ft.TVDSS) Bottom of window 10192 ft.MD (8865 ft.TVDSS) (10) Open hole sidetrack from G-24APB1 at 11245 feet MD (8963 feet TVDSS). (11) The interval from 12340 feet to 12380 feet MD (8961 feet to 8961 feet TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP_AVG -> Rate of Penetration, feet/hour RACHX -> Resistivity (AT)(LS) 2MHz-Compensated Borehole Corrected, ohm.m RACLX -> Resistivity (AT)(LS) 400kHz-Compensated Borehole Corrected, ohm.m RPCLX -> Resistivity (PD)(LS) 400kHz-Compensated Borehole Corrected, ohm.m RPCHX -> Resistivity (PD)(LS) 2MHz-Compensated Borehole Corrected, ohm.m TVD -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9480.16, 9479.13, ! -1.03613 9485.35, 9485.76, ! 0.414062 9490.94, 9490.32, ! -0.62207 9496.13, 9498.61, ! 2.4873 9504, 9502.76, ! -1.24316 9507.73, 9509.19, ! 1.45117 9512.5, 9513.54, ! 1.03711 9520.53, 9520.53, ! 0 9529.03, 9528.41, ! -0.62207 9534.21, 9532.76, ! -1.45117 9546.65, 9545.82, ! -0.829102 9551.42, 9551.21, ! -0.207031 9553.7, 9553.28, ! -0.414062 9556.6, 9556.18, ! -0.415039 9563.44, 9563.65, ! 0.207031 10168.4, 10168.2, ! -0.207031 10188.3, 10187.9, ! -0.414062 10189.8, 10189.8, ! 0 10191, 10191.8, ! 0.829102 10203.2, 10204.3, ! 1.03613 10213.6, 10213.4, ! -0.207031 10220.5, 10220.9, ! 0.414062 10223.6, 10223.4, ! -0.207031 10234, 10233.5, ! -0.414062 10238.9, 10238.5, ! -0.415039 10241.6, 10241, ! -0.621094 10248.5, 10247.4, ! -1.03613 10250.7, 10250.3, ! -0.414062 10256.7, 10255.9, ! -0.829102 10260.5, 10259.9, ! -0.62207 10263.8, 10262.8, ! -1.03613 10281.2, 10280.8, ! -0.415039 10286.8, 10286.2, ! -0.62207 10290.1, 10289.7, ! -0.415039 10294.9, 10294.9, ! 0 10298.4, 10297, ! -1.45117 10301.5, 10306.9, ! -0.621094 10303.6, 10304.2, ! 0.62207 10306.9, 10306.7, ! -0.207031 10310.6, 10309.2, ! -1.45117 10313.5, 10312.9, ! -0.62207 10315.4, 10315.4, ! 0 10318.1, 10317.3, ! -0.829102 10324.3, 10321.6, ! -2.69531 10328.3, 10324.3, ! -3.93848 10332.8, 10331.4, ! -1.45117 10334.7, 10334.1, ! -0.621094 10339, 10338.2, ! -0.829102 10342.4, 10341.5, ! -0.830078 10345.8, 10345.4, ! -0.415039 10350.6, 10348.7, ! -1.86523 10371.1, 10370.3, ! -0.829102 10383.1, 10381.7, ! -1.45117 10392.3, 10390.6, ! -1.65918 10429.6, 10428.8, ! -0.829102 10432.1, 10432.3, ! 0.207031 10447.8, 10447.6, ! -0.208008 10457.6, 10457.6, ! 0 10473.8, 10470.4, ! -3.31641 10485.6, 10482.5, ! -3.11035 10489.3, 10489.3, ! 0 10547.8, 10546.7, ! -1.03613 10555.9, 10554, ! -1.86621 10566.4, 10566.2, ! -0.208008 10572, 10570, ! -2.07324 10576.4, 10573.5, ! -2.90234 10582, 10582.2, ! 0.207031 10593.2, 10592.6, ! -0.62207 10604.2, 10604.4, ! 0.207031 10610.4, 10608.6, ! -1.86621 10635.7, 10633.9, ! -1.86621 10656.1, 10654.4, ! -1.6582 10666.4, 10662.5, ! -3.93945 10717.7, 10717.3, ! -0.414062 10719.6, 10721.2, ! 1.6582 10723.9, 10724.1, ! 0.208008 10787.5, 10782.6, ! -4.97559 10791.1, 10786.3, ! -4.76855 10797.1, 10791.9, ! -5.18164 10805.1, 10801.2, ! -3.93848 10854.8, 10849.9, ! -4.97461 10858.8, 10854.6, ! -4.14648 10865.4, 10861.9, ! -3.52344 10873.1, 10868.5, ! -4.56055 10877.4, 10873.7, ! -3.73145 10882, 10879.1, ! -2.90234 10890.5, 10884.7, ! -5.80469 10989.2, 10983.2, ! -6.01172 10991.5, 10985.5, ! -6.01172 11006,. 11 002.1, ! -3.93848 11036.1, 11027.4, ! -8.70605 11038.2, 11030.5, ! -7.66992 11052.4, 11047, ! -5.38965 11098.6, 11094.7, ! -3.93848 • 11103.8, 11097.6, ! -6.21875 11107.7, 11101.5, ! -6.21875 11110.4, 11104.6, ! -5.80469 11118.5, 11111.1, ! -7.46191 11121.4, 11115, ! -6.42578 11151, 11149.6, ! -1.45117 11214.6, 11213.3, ! -1.24316 11258.2, 11250.9, ! -7.25586 11262.3, 11254.9, ! -7.46191 11267.3, 11260.5, ! -6.84082 11274.4, 11268.1, ! -6.21875 11360.4, 11352.1, ! -8.29199 11365.6, 11355.8, ! -9.74316 11369.5, 11359.8, ! -9.74316 11374.1, 11362.7, ! -11.4014 11403.8, 11397.4, ! -6.42578 11414.4, 11407.2, ! -7.25488 11427.3, 11417.3, ! -9.9502 11430.4, 11421.3, ! -9.12109 11434.5, 11426.6, ! -7.87695 11478.9, 11470.2, ! -8.70605 11533.6, 11523.1, ! -10.5713 11538.4, 11526.6, ! -11.8164 11543, 11532, ! -10.9873 11561.1, 11550.5, ! -10.5723 11563.2, 11552.8, ! -10.3652 11567.7, 11556.9, ! -10.7803 11621.5, 11611.5, ! -9.9502 11625.4, 11614.4, ! -10.9873 11628.5, 11617.7, ! -10.7793 11632.4, 11621.2, ! -11.1943 11704.2, 11691.1, ! -13.0596 11715.8, 11703, ! -12.8525 11717.9, 11705.9, ! -12.0234 11795.4, 11780.7, ! -14.7188 12189.8, 12171.5, ! -18.2422 12196.2, 12178.4, ! -17.8271 12199.5, 12181.5, ! -18.0342 12226.3, 12205.3, ! -20.9365 12228.5, 12209.7, ! -18.8633 12235.6, 12215.3, ! -20.3154 12240.4, 12218.2., ! -22.1807 12245.3, 12223.6, ! -21.7656 12248.9, 12226.9, ! -21.9736 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 213 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN G-24A 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN G-24A APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** ~!!!!!!~!!!!!!!!~!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDCL from Schlumberger GR CNL dated 02 Jan 2007 per Mike McTeague with BP Exploration (Alaska), Inc. *** INFORMATION TABLE: CIFO MNEM ----- CHAN DIMT -------------- CNAM ---- ODEP GR ---- GR ------ -- GRAX ----------------- 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Total Data Records: 162 Tape File Start Depth = 9476.000000 Tape File End Depth = 12380.000000 Tape File Level Spacing = 0.500000 • Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 175 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN Madpass_5.xtf LCC 150 CN BP Exploration (Alaska) WN G-24A APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDCL from Schlumberger GR CNL dated 02 Jan 2007 per Mike McTeague with BP Exploration (Alaska), Inc. *** INFORMATION TABLE: CIFO MNEM ----- CHAN DIMT ----------------- CNAM --- ODEP RAD - RAD ---- ----- RACLX ----------------- 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 20 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 50 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units Size Length 1 RAD MWD 68 1 OHMM 4 4 2 RAS MWD 68 1 OHMM 4 4 3 RPD MWD 68 1 OHMM 4 4 4 RPS MWD 68 1 OHMM 4 4 16 Total Data Records: 87 Tape File Start Depth = 10182.000000 Tape File End Depth = 12346.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 98 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .003 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN Madpass.xtf LCC 150 CN BP Exploration (Alaska) WN G-24A APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field MADPass data. *** INFORMATION TABLE: LIFO MNEM CHAN DIMT CNAM ODEP RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 20 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 50 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units 1 RAD MWD 68 1 OHMM 2 RAS MWD 68 1 OHMM 3 RPD MWD 68 1 OHMM 4 RPS MWD 68 1 OHMM Total Data Records: 174 1 Size Length 4 4 4 4 4 4 4 4 16 Tape File Start Depth = 10182.250000 Tape File End Depth = 12346.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 4 185 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .004 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN G-24A.xtf LCC 150 CN BP Exploration (Alaska) WN G-24A APIN FN Prudhoe Bay Unit • ~ ~ COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!'!'!!!!! " '!! Remark File Version 1.000 This file contains the raw-unedited field MWD data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR GR GRAX 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 323 Tape File Start Depth = 9476.000000 Tape File End Depth = 12379.750000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 5 336 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 07/01/28 1292115 01 **** REEL TRAILER **** MWD 08/08/06 BHI O1 Tape Subfile: 6 2 records... • Minimum record length: 132 bytes Maximum record length: 132 bytes • • Tape Subfile 1 is type: LIS • Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9476.0000 49.7839 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9476.5000 48.6406 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9500.0000 59.8530 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10200.0000 22.4007 -999.2500 2.5774 2.7929 3.8589 1.9635 10300.0000 101.6072 40.9031 12.9921 10.4113 8.5761 10.5027 10400.0000 54.4188 3594.9277 24.8884 16.0130 12.7694 11.0894 10500.0000 47.1280 51.8295 15.1082 10.7376 8.4741 7.0719 10600.0000 43.0489 74.9388 25.1792 21.9358 16.3810 14.4819 10700.0000 62.9191 104.4011 32.7183 21.6110 16.3867 14.1332 10800.0000 51.8283 82.3583 17.7620 14.7416 12.0381 10.7540 10900.0000 37.4633 100.6791 14.1652 13.7675 11.4214 10.8620 11000.0000 46.8698 126.9311 21.9539 19.5005 13.9383 11.5888 11100.0000 180.9431 103.2885 24.8361 19.4082 18.4400 14.9918 11200.0000 204.8462 84.7681 9.2715 28.8474 5.7554 8.8085 11300.0000 30.8517 -999.2500 16.5030 14.1509 11.7643 10.9150 11400.0000 33.0671 121.6671 7.1087 5.6104 11500.0000 24.9859 134.0991 12.9885 14.8563 11600.0000 27.2534 126.9365 14.7708 17.6296 11700.0000 35.4219 148.0741 13.2316 13.2058 11800.0000 42.4637 114.6251 11.3746 12.2790 11900.0000 36.5794 140.9187 11.1415 9.6495 12000.0000 42.7806 98.3522 11.9014 11.1700 12100.0000 49.3305 87.6802 9.7956 9.3541 12200.0000 72.3639 34.1050 9.1150 9.0827 12300.0000 59.3000 129.7000 7.5800 7.1010 12380.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9476.000000 Tape File End Depth = 12380.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet 11.3030 11.1136 11.7547 14.7544 11.5854 18.6259 16.6615 11.7618 10.6811 10.2300 -999.2500 8.6787 13.9719 14.9819 13.7700 12.1161 16.2117 13.4106 11.2433 9.5135 8.5550 -999.2500 Tape Subfile 3 is type: LIS DEPTH RAD RAS RPD RPS 10182.0000 -999.2500 -999.2500 -999.2500 -999.2500 10182.5000 0.2367 3032.6978 19635.0820 53821.6797 10200.0000 2.6328 3.2105 3.7481 2.9166 10300.0000 15.3001 9.2402 12.2588 7.3717 10400.0000 25.1195 16.6448 13.4650 11.5166 10500.0000 15.0981 10.3275 8.3641 6.8811 10600.0000 25.2630 22.2645 16.4768 14.5080 10700.0000 32.5332 21.6312 16.3610 14.1102 10800.0000 17.7570 14.7550 12.0331 10.7539 10900.0000 13.8459 13.2584 10.8224 10.7646 11000.0000 22.3356 21.1136 15.0006 13.5110 11100.0000 22.5942 19.2670 15.3193 13.0770 11200.0000 18.0511 16.4071 10.5019 11.2432 11300.0000 16.1154 14.6033 11.1994 10.1668 11400.0000 11.5121 8.8263 7.3477 5.8596 11500.0000 11.1245 13.8976 12.9228 14.8856 11600.0000 11.7775 14.8976 14.6827 17.3964 11700.0000 14.7739 13.8459 13.2835 13.2013 11800.0000 11.6780 12.0058 11.4600 12.2788 11900.0000 18.3956 15.8085 11.2676 8.8854 12000.0000 16.5769 13.1136 12.0775 11.2216 12100.0000 11.8892 11.3016 9.7530 9.0850 12200.0000 10.6232 9.3481 9.0963 9.0909 12300.0000 10.2042 9.6131 10.0289 10.8618 12.346.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 10182.000000 Tape File End Depth = 12346.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet • • Tape Subfile 4 is type: LIS DEPTH RAD RAS RPD RPS 10182.2500 -999.2500 -999.2500 -999.2500 -999.2500 10182.5000 0.2367 3032.6978 19635.0820 53821.6797 10200.0000 2.5854 3.2592 3.7776 2.9636 10300.0000 15.4675 9.1553 12.5258 7.1453 10400.0000 24.3990 15.4932 12.6269 11.0238 10500.0000 15.0791 10.7784 8.4992 7.1556 10600.0000 25.2630 22.1977 16.3171 14.7468 10700.0000 31.5727 21.6587 16.1262 13.8190 10800.0000 17.6563 13.5968 11.7529 10.9199 10900.0000 14.2379 13.0676 11.4797 11.1709 11000.0000 20.1899 19.4844 14.8600 13.4858 11100.0000 23.2479 16.0738 15.4106 13.2475 11200.0000 9.1688 11.5848 5.8544 7.1839 11300.0000 16.8912 14.2828 11.2810 10.0272 11400.0000 10.9757 8.8882 7.3437 6.1919 11500.0000 10.2083 12.7148 11.6254 13.4365 11600.0000 11.7297 15.4574 15.2349 19.5017 11700.0000 14.6726 14.2099 11.8873 11.1163 11800.0000 11.9831 11.5918 10.6637 10.7443 11900.0000 19.4829 18.7977 16.1767 15.3925 12000.0000 17.2210 13.5082 11.4325 9.9186 12100.0000 12.3354 11.9055 10.9042 11.4480 12200.0000 14.0065 12.0696 10.5561 9.7194 12300.0000 10.3260 9.2819 8.1568 8.1661 12346.0000 11.2766 9.2524 8.0396 6.4552 Tape File Start Depth = 10182.250000 Tape File End Depth = 12346.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet • Tape Subfile 5 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9476.0000 48.2000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9476.2500 48.4000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9500.0000 68.2000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10200.0000 20.7000 -999.2500 2.6340 2.9950 3.7130 2.8460 10300.0000 115.6000 29.8000 15.4800 9.1480 12.5490 7.1130 10400.0000 49.7000 38.3000 24.4510 15.5270 12.6290 11.0480 10500.0000 46.8000 57.2000 15.0840 10.7720 8.4950 7.1420 10600.0000 43.6000 76.1000 25.1910 22.0240 16.3810 14.5240 10700.0000 63.2000 111.6000 31.5420 21.6580 16.1190 13.8190 10800.0000 53.2000 110.4000 17.6700 13.6310 11.8130 10.9530 10900.0000 31.4000 78.6000 14.2170 13.0730 11.4400 11.1800 11000.0000 46.7000 127.5000 20.1900 19.4970 14.8250 13.4570 11100.0000 56.6000 122.1000 23.4350 16.0770 15.5500 13.2290 11200.0000 214.0000 79.7000 9.4950 17.9930 5.6160 8.2660 11300.0000 31.5000 -999.2500 16.9000 14.2540 11.2790 10.0110 11400.0000 26.6000 147.2000 7.3410 6.1970 11500.0000 24.5000 141.000C 11.6220 13.4150 11600.0000 27.4000 99.2000 15.2350 19.5170 11700.0000 24.7000 106.3000 12.1280 11.7810 11800.0000 33.6000 135.1000 10.6840 10.7540 11900.0000 27.5000 143.1000 15.5160 13.3960 12000.0000 41.9000 97.3000 11.4250 9.9120 12100.0000 49.0000 122.1000 10.8710 11.4230 12200.0000 81.1000 113.7000 10.5630 9.7090 12300.0000 47.3000 111.1000 8.1570 7.6470 12379.7500 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9476.000000 Tape File End Depth = 12379.750000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet • 10.9690 10.2100 11.7360 14.2230 11.9830 19.5510 17.2210 12.3170 14.0100 10.2200 -999.2500 8.8890 12.7250 15.4830 14.7280 11.5960 17.9610 13.5060 11.8900 12.0150 9.4030 -999.2500 • • Tape Subfile 6 is type: LIS • **** REEL HEADER **** MWD 08/08/06 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 07/01/27 1643649 O1 3" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Information Block #MNEM.UNIT Data Type Information STRT.FT 9476.0000: Starting Depth STOP.FT 12206.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: G-24APB1 FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 19' 18.588"N 148 deg 43' 0.723"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 27 Jan 2007 API API NUMBER: 500292167170 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 12 TOWN.N T11N RANG. R13E PDAT. MSL EPD .F 0 LMF DF FAPD.F 72.1 DMF DF EKB .F 0 EDF .F 72.1 . EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. ~cX.~sa- i~- i ~3 (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, .Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log from well G-24A per Mike McTeague with BP Exploration (Alaska), Inc. (8) Tied to G-24A at 10162 feet MD (8842.54 feet TVDSS). (9) The sidetrack was drilled from G-24 through a milled window in a 7 inch liner. Top of window 10181 ft.MD (8857 ft.TVDSS) Bottom of window 10192 ft.MD (8865 ft.TVDS5) (10) The interval from 12165 feet to 12205 feet MD (8961 feet to 8962 feet TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD~ (MWD-API units) ROP_AVG -> Rate of Penetration, feet/hour RACHX -> Resistivity (AT)(LS) 2MHz-Compensated Borehole Corrected, ohm.m RACLX -> Resistivity (AT)(LS) 400kHz-Compensated Borehole Corrected, ohm.m RPCLX -> Resistivity (PD)(LS) 400kHz-Compensated Borehole Corrected, ohm.m RPCHX -> Resistivity (PD)(LS) 2MHz-Compensated Borehole Corrected, ohm.m TVD -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9480.19, 9479.15, ! -1.03711 9485.16, 9484.96, ! -0.207031 9490.97, 9490.55, ! -0.415039 9494.49, 9495.74, ! 1.24414 9497.6, 9499.05, ! 1.45117 9500.5, 9500.71, ! 0.207031 9504.03, 9502.99, ! -1.03711 95Q7.34, 9508.38, ! 1.03711 9510.66, 9511.49, ! 0.829102 9511.7, 9512.32, ! 0.62207 9512.73, 9513.56, ! 0.829102 9514.6, 9515.43, ! 0.829102 9519.99, 9520.4, ! 0.414062 9529.11, 9528.49, ! -0.62207 9534.29, 9532.43, ! -1.86523 9536.99, 9535.54, ! -1.45117 9539.48, 9538.65, ! -0.829102 9546.94, 9545.9, ! -1.03613 9551.71, 9550.88, ! -0.829102 9553.57, 9553.16, ! -0.415039 9556.89, 9556.47, ! -0.415039 9563.52, 9563.94, ! 0.414062 9567.05, 9567.05, ! 0 10168.4, 10168.2, ! -0.208008 10186.9, 10186.3, ! -0.62207 10190.2, 10190.2, ! 0 10191.4, 10192.5, ! 1.03613 10193.9, 10195, ! 1.03613 10203.3, 10204.5, ! 1.24414 10205.5, 10206.4, ! 0.829102 10209.1, 10209.7, 10212.2, 10212.4, 10213.8, 10214, 10220.5, 10220.9, 10223.4, 10223.4, 10226.5, 10226.1, 10233.7, 10233.3, 10239.1, 10238.3, 10241.4, 10240.8, 10243.3, 10242.4, 10248.1, 10247, 10250.3, 10249.3, 10256.8, 10255.7, 10260.3, 10259.9, 10263.6, 10262.6, 10266.7, 10265.7, 10275.6, 10275, 10281.1, 10280.7, 10287.1, 10286.5, 10290.2, 10289.8, 10294.6, 10294.6, 10298.3, 10296.9, 10301.4, 10300.4, 10303.7, 10303.9, 10307.2, 10307.2, 10310.8, 10309.5, 10313.7, 10312.8, 10317.7, 10316.9, 10324.8, 10321.9, 10328.3, 10324.8, 10333.3, 10332, 10334.9, 10334.1, 10337.4, 10336.4, 10339.3, 10338.6, 10342.2, 10341.1, 10346.1, 10345.3, 10350.9, 10349.2, 10366.1, 10365, 10370.8, 10369.8, 10378.9, 10377, 10383.5, 10381.6, 10386.8, 10385.3, 10391.5, 10389.7, 10401.7, 10399.8, 10431.9, 10432.1, 10438.5, 10438.5, 10444.1, 10444.1, 10449.5, 10449.3, 10457.2, 10457.2, 10464.2, 10462.6, 10470.5, 10467.8, 10478.5, 10475.4, 10480.8, 10477.3, 10485.6, 10482.3, 10486.8, 10484.4, 10492.9, 10493.1, 10497.1, 10496.9, 10506.7, 10506.3, 10518.9, 10518.3, 10521.4, 10520.4, 10533, 10532, 10543.8, 10542.7, 10547.9, 10546.7, 10555.6, 10553.7, 10560.6, 10559.7, 10564.7, 10563.5, 10568.4, 10567.2, 0.621094 0.207031 0.207031 0.414062 0 -0.414062 -0.415039 -0.829102 -0.62207 -0.829102 -1.03613 -1.03613 -1.03613 -0.415039 -1.03613 -1.03613 -0.62207 -0.415039 -0.62207 -0.415039 0 -1.45117 -1.03711 0.207031 0 -1.24414 -0.829102 -0.829102 -2.90234 -3.52441 -1.24414 -0.829102 -1.03613 -0.62207 -1.03711 -0.829102 -1.6582 -1.03711 -1.03711 -1.86523 -1.86523 -1.45117 -1.86621 -1.86523 0.207031 0 0 -0.207031 0 -1.6582 -2.69531 -3.10938 -3.52344 -3.31641 -2.4873 0.207031 -0.207031 -0.414062 -0.621094 -1.03711 -1.03711 -1.03613 -1.24316 -1.86523 -0.829102 -1.24316 -1.24414 10571.5, 10569.9, ! -1.65918 10577.6, 10575.3, ! -2.28027 10582.1, 10582.1, ! 0 10584.8, 10584.6, ! -0.207031 10589.8, 10589.2, ! -0.621094 10599.9, 10599.7, ! -0.208008 10604.1, 10603.9, ! -0.207031 10610.5, 10608.9, ! -1.65918 10617.4, 10615.7, ! -1.65918 10622.5, 10620.9, ! -1.6582 10634.6, 10632.7, ! -1.86523 10654.6, 10652.7, ! -1.86621 10657.5, 10655.8, ! -1.6582 10659.8, 10657.5, ! -2.28027 10666, 10662.3, ! -3.73145 10670.8, 10667.5, ! -3.31738 10673.5, 10670.1, ! -3.31641 10679.3, 10676.4, ! -2.90234 10683.8, 10680.9, ! -2.90234 10687.4, 10684.7, ! -2.69531 10693.6, 10691.5, ! -2.07324 10704.7, 10703.2, ! -1.45117 10718.2, 10718, ! -0.207031 10719.6, 10720.9, ! 1.24414 10724, 10724.6, ! 0.62207 10730.2, 10730.2, ! 0 10733.3, 10732.7, ! -0.62207 10749.5, 10747.2, ! -2.28027 10755.9, 10753.6, ! -2.28027 10761.5, 10758.6, ! -2.90234 10765.6, 10762.1, ! -3.52441 10787.6, 10782.6, ! -4.97559 10791.1, 10786.4, ! -4.76758 10794.2, 10788.6, ! -5.59668 10796.9, 10791.5, ! -5.38965 10805.1, 10800.9, ! -4.14551 10815.4, 10811.3, ! -4.14648 10818.7, 10814.4, ! -4.35352 10848.2, 10843.2, ! -4.97559 10854.2, 10849.5, ! -4.76758 10858.8, 10854.4, ! -4.35352 10865.4, 10861.7, ! -3.73145 10873.1, 10868.7, ! -4.35352 10878.1, 10874.1, ! -3.93848 10886.4, 10882.2, ! -4.14551 10890.7, 10885.1, ! -5.59668 10894.5, 10888.4, ! -6.01172 10899.9, 10894.1, ! -5.80371 10910.9, 10904.9, ! -6.01172 10978.7, 10972.5, ! -6.21875 10987.2, 10980.8, ! -6.42578 10990.1, 10984.3, ! -5.80469 11003.6, 10999, ! -4.56055 11006.1, 11001.9, ! -4.14648 11011, 11006.3, ! -4.76758 11013.3, 11008.1, ! -5.18262 11022.2, 11016, ! -6.21875 11028, 11020.4, ! -7.66992 11032.8, 11024.5, ! -8.29199 11035.5, 11027, ! -8.49902 11038, 11030.1, ! -7.87695 11052.5, 11046.7, ! -5.80469 11057.5, 11051.9, ! -5.59668 11066.5, 11061.5, ! -4.97461 11094.9, 11090.8, ! -4.14551 11096.2, 11091.8, ! -4.35352 11098.2, 11094.3, ! -3.93945 ,~ 11105.1, 11099.1, ! -6.01172 11107.6, 11101.3, ! -6.21875 11110.5, 11104.7, ! -5.80469 11118.8, 11111.3, ! -7.46191 11121.7, 11115, ! -6.63281 11122.9, 11117.1, ! -5.80469 11135.9, 11132, ! -3.93848 11146.5, 11144.4, ! -2.07324 11151.2, 11149.4, ! -1.86523 11153.9, 11152.3, ! -1.6582 11163.5, 11162, ! -1.45117 11170.9, 11169.3, ! -1.6582 11173.4, 11171.8, ! -1.6582 11185.6, 11184, ! -1.6582 11200, 11198.5, ! -1.45117 11203.7, 11202.5, ! -1.24414 11209.9, 11208.7, ! -1.24414 11214.3, 11212.6, ! -1.6582 11219.1, 11217.2, ! -1.86621 11229.8, 11226.3, ! -3.52344 11237.7, 11232.7, ! -4.97559 11240.4, 11235.6, ! -4.76758 11242.8, 11237.7, ! -5.18262 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 261 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN G-24APB1 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN G-24APB1 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 Data presented here is final and has been depth adjusted to a PDC (Primary Depth log from well G-24A per Mike McTeague with BP Exploration (Alaska), Inc. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP GR GR GRAX 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 152 Tape File Start Depth = 9476.000000 Tape File End Depth = 12206.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 165 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 ~~ *** INFORMATION TABLE: CONS MNEM VALU WDFN G-24APB1.xtf LCC 150 CN BP Exploration (Alaska) WN G-24APB1 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP GR GR GRAX 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Total Data Records: 304 • Tape File Start Depth = 9476.000000 Tape File End Depth = 12204.750000 L` Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 317 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 07/01/27 1643649 O1 **** REEL TRAILER **** MWD 08/08/06 BHI O1 Tape Subfile: 4 2 records... • Minimum record length: 132 bytes Maximum record length: 132 bytes Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9476.0000 49.7788 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9476.5000 48.6219 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9500.0000 63.5292 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10200.0000 22.7661 -999.2500 3.3485 7.7064 8.3883 6.0402 10300.0000 97.7538 45.4188 14.6283 11.6582 10.4177 10.0970 10400.0000 54.4225 1485.2722 24.8380 18.5785 15.9370 14.6970 10500.0000 47.2249 50.2424 15.6178 11.7384 9.5950 8.0884 10600.0000 42.4793 73.7385 26.5990 23.5252 19.9741 19.1563 10700.0000 63.4904 104.4328 33.5339 24.4748 19.8580 18.4160 10800.0000 52.6685 71.5350 18.4616 16.3589 13.9376 12.9534 10900.0000 37.5735 99.1993 14.3955 14.7033 13.8360 14.6997 11000.0000 45.5691 127.8770 22.2261 21.4652 18.1162 17.6272 11100.0000 179.6876 99.9247 21.3062 16.7484 14.8868 19.0906 11200.0000 206.0213 87.4254 16.2421 12.5424 11.7269 11.3122 11300.0000 33.8398 157.8371 17.8235 15.9857 14.4415 14.1556 11400.0000 36.0129 153.0797 13.9462 14.8912 11500.0000 32.5586 91.8043 10.2188 11.4700 11600.0000 177.3406 47.1680 11.5027 9.2013 11700.0000 165.8402 50.3211 14.4883 14.5415 11800.0000 127.1402 39.7812 6.8650 7.5060 11900.0000 26.5000 89.9414 14.6913 13.4120 12000.0000 43.5996 91.5176 13.0845 11.5893 12100.0000 29.0199 123.9195 13.0178 12.6539 12200.0000 -999.2500 -999.2500 -999.2500 -999.2500 12206.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9476.000000 Tape File End Depth = 12206.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet • 14.1462 9.0644 10.2439 17.0336 8.2826 18.9519 19.0295 15.9133 -999.2500 -999.2500 14.4843 11.2032 35.2006 15.9263 7.0696 17.7550 16.4910 14.3248 -999.2500 -999.2500 Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9476.0000 48.2000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9476.2500 48.4000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9500.0000 68.2000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10200.0000 20.7000 -999.2500 3.8060 8.2590 8.1440 5.7590 10300.0000 115.6000 29.8000 14.0600 10.9110 9.9240 9.6150 10400.0000 49.7000 38.3000 25.4780 19.0050 15.8840 14.3210 10500.0000 46.8000 57.2000 15.6210 11.7140 9.5950 8.1150 10600.0000 43.6000 76.1000 26.2340 23.5640 20.0930 19.3780 10700.0000 63.2000 111.6000 32.7640 24.0120 19.8580 18.1860 10800.0000 53.2000 110.4000 18.3200 15.9250 13.8360 13.0050 10900.0000 31.4000 78.6000 14.1870 14.7140 13.7030 14.5170 11000.0000 46.7000 127.5000 21.2110 20.7200 17.3410 16.8940 11100.0000 56.6000 122.1000 24.7620 18.9640 16.2630 14.8500 11200.0000 214.0000 79.7000 17.0020 12.9110 11.2870 10.3790 11300.0000 29.8000 158.9000 18.1260 16.1850 14.2480 13.8840 11400.0000 33.1000 151.4000 13.1880 13.2890 11500.0000 43.7000 130.9000 10.4370 11.4700 11600.0000 169.1000 27.9000 9.4770 8.9960 11700.0000 159.7000 123.0000 16.7680 18.8490 11800.0000 149.2000 29.9000 7.0180 7.5720 11900,0000 24.8000 146.8000 15.5810 14.7580 12000.0000 40.4000 107.1000 14.2320 13.4120 12100.0000 27.4000 126.2000 13.1790 13.0870 12200.0000 -999.2500 78.6000 -999.2500 -999.2500 12204.7500 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9476.000000 Tape File End Depth = 12204.750000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet 14.3970 9.4070 8.3500 16.7050 8.4890 18.5780 18.5020 15.9430 -999.2500 -999.2500 14.3220 11.2120 18.9720 16.4270 7.2330 18.6640 15.8080 14.1040 -999.2500 -999,2500 ~ ~ Tape Subfile 4 is type: LIS