Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-097 STATE OF ALASKA H EL.e,I V eD \SKA OIL AND GAS CONSERVATION ( (MISSION APR 2 3 2015 REPORT OF SUNDRY WELL OPERATIONS AUGGO 1. Operations Performed: 0 Abandon ®Repair Well 0 Plug Perforations 0 Perforate 0 Re-Enter Suspended Well ®Alter Casing ®Pull Tubing 0 Stimulate-Frac 0 Waiver ®Other 0 Change Approved Program 0 Operation Shutdown 0 Stimulate-Other 0 Time Extension Scab Liner 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration(Alaska)Inc. 0 Exploratory 0 Stratigraphic 198497 3. Address: ®Development 0 Service 6. API Numbe P.O. Box 196612,Anchorage,Alaska 99519-6612 50-029-22886-00-00 7. Property Designation(Lease Number): 8. Well Name and Number: ADL 365548 PBU P2-10 9. Logs(list logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): Prudhoe Bay/Pt McIntyre 11. Present well condition summary: Total depth: measured 10250' feet Plugs:(measured) None feet true vertical 9288' feet Junk:(measured) None feet Effective depth: measured 10154' feet Packer: (measured) 9201',9681' feet true vertical 9192' feet Packer: (true vertical) 8248',8721' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 78' 20" 39'- 117' 39'-117' Surface 5375' 9-5/8" 38'-5413' 38'-4944' 5750 3090 Intermediate Production 10198' 7" 36'-10234' 36'-9272' 7240/8160 5410/7020 Liner Scab Liner 3860' 5-1/2"x 3-1/2" 5888'-9748' 5356'-8787' 7740/10160 6280/10530 Perforation Depth: Measured Depth: 9850'-10020' feet True Vertical Depth: 8889'-9058' feet Tubing(size,grade,measured and true vertical depth): 4-1/2", 12.6#x 3-1/2",9.2"; 13Cr85; 9669=9653' 9506'-8693' 4-1/2",12.6# 13Cr80 9678'-9736' 8718'-8775' Packers and SSSV(type,measured and true vertical depth): 5-1/2"x 3-1/2"HES TNT Packer; 9201'; 8248'; 7"x 4-1/2"Baker S-3 Permanent Packer 9681' 8721' 12.Stimulation or cement squeeze summary: 54q bP�14148) MAY 1 8 2U15 Intervals treated(measured): Treatment description including volumes used and final pressure: Cut 4-1/2", 12.6#13Cr80 Tubing at 9678'.Cut and Pull Tubing at—9465'. Run 5-1/2", 17#, L-80 x 3-1/2",9.2"13Cr80 Scab Liner. Cement Scab Liner with 42 Bbls(180 sx)Class'G'. Run 4-1/2", 12.6#x 3-1/2",9.2#13Cr85 Tubing to 9412'. 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 1220 0 Subsequent to operation: 0 0 0 420 0 14.Attachments: ❑Copies of Logs and Surveys run 15.Well Class after work: 0 Exploratory 0 Stratigraphic 0 Development 0 Service ®Daily Report of Well Operations 16. Well Status after work: ®Oil 0 Gas 0 WDSPL 0 Well Schematic Diagram 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP ❑SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact: Abby Warren,564-5720 Email:Abigail.Warren@bp.com 314-674 Printed Name: Joe Last a Title: Drilling Technologist Signature: A. ne: 564-4091 Date: 4/2,2/16 Form 10-404 Revised 10/2012 vri. 670 fly RBDMBJC' APR 2 8 9010 Submit Original Only •Oe F2"47(/ice P2-10, Well History (Pre-Rig Workover) Date Summary 12/26/14 T/I/O=SSV/1232/45.Temp=SI. MIT-OA to 1200 psi PASSED. (Pre-RWO). OA FL= Near surface. Used 4.6 bbl of diesel to achieve test pressure of 1200 psi. OAP lost 64 psi in the first 15 minutes&6 psi in the second 15 minutes for a total loss of 70 psi in 30 minutes. 12/27/14 T/I/O=SSV/1232/1130.Temp=SI. MIT-OA to 1200 psi PASSED. (Pre-RWO). OA FL= Near surface. Used 4.6 bbl of diesel to achieve test pressure of 1200 psi. OAP lost 64 psi in the first 15 minutes&6 psi in the second 15 minutes for a total loss of 70 psi in 30 minutes. Bled OAP from 1130 psi to 45 psi in 20 minutes, 1 bbl of fluid returned, IAP decreased 6 psi during OAP bleed. Rig down &monitor for 60 minutes. No change in WHP's during rig down& 1 hour monitor. Final WHP's=SSV/1226/45. SV,WV& SSV=C. MV=0. IA&OA=OTG. NOVP. 01:40. 01/05/15 T/I/O= 1320/1240/80.Temp= SI. T& IA FLs(EL).AL SI @ casing valve(1340 psi). Opened SSV for TP &TBG FL. TBG FL @ 1270' (20 bbls). IA FL @ 4215'(above sta#1, DMY)(74 bbls). Closed SSV on departure. SV, WV, SSV=C. MV=O. IA, OA=OTG. NOVP. 13:15. 01/05/15 T/I/O=SSV/1,240/80, Temp:SI PPPOT-T(PASS), PPPOT-IC(PASS) Pre RWO. PPPOT-T: Stung into test void, ( 1,050 psi) bled void to 0 psi. Functioned LDS,all moved freely.Torqued to 350 ft/lbs. Pumped through void, good returns. Pressured test void to 5,000 psi for 30 minute test. Lost 50 psi in 15 minutes, lost 0 psi in second 15 minutes. (PASS) Bled void to 0 psi. PPPOT-IC: Stung into test void, (750 psi) bled void to 0 psi. Functioned LDS,all moved freely.Torqued to 350 ft/lbs. Pumped through void, good returns. Pressured test void to 3,500 psi for 30 minute test. Lost 0 psi in 30 minute test. (PASS) Bled void to 0 psi. 01/08/15 ***WELL SHUT-IN ON ARRIVAL***(SLB ELINE-DRIFT/JET CUT). INITIAL T/I/O= 1300/1260/50 RUN 1: DRIFT TO 9690'WITH 3.68"GAUGE RING AND JUNK BASKET. RUN 2: CUT TUBING AT 9677'WITH 3.65"CUTTER. CCL TO MID CUTTER=22.52'. CCL STOP DEPTH =9654.48'. GOOD INDICATION OF SHOT. POOH. FINAL T/I/O= 1300/1280/80.WELL SHUT-IN ON DEPARTURE. 01/10/15 T/I/0=1380/1240/65 Temp=S/I Circ out(PRE RWO) Pumped 5 bbls of meth followed by 450 bbls of 90*F 9.8 brine down Tbg taking returns up IA and down P2-04's flowline to circ out well. Pumped 8 bbls of diesel down Tbg for freeze protect. Pumped 9 bbls of meth tailed with 1 bbl of diesel to freeze protect surface hardline and P2-04's flowline. Pumped 130 bbls of 90*F 9.8 brine down IA. Pumped 9 bbls of diesel down IA for freeze protect. Hardline valves=closed SV,WV,SSV,AL=closed MV=open IA,OA=otg. FWHP=vac/vac/0. Tags hung on MV and IA. Fluid packed annulus sign on tree. DSO notified of well status on departure. 01/11/15 T/I/O=SSV/340/20.Temp=SI. Cement control lines(Pre RWO).AL SI @ casing valve,ALP= 1200 psi. Pumped 1 gallon cement down control line. Pumped 1 gallon cement down balance line. Job complete. Final WHPs=SSV/340/20. SV,WV, SSV=C. MV=0. IA, OA=OTG. 17:00. 01/16/15 T/I/O=SSV/390/25.Temp=SI. P.T. control lines to 3000 psi*PASSED*. (pre RWO).AL SI @ casing valve,ALP= 1200 psi. Pressured control line @ 12 o'clock position to 3000 psi, lost 105 psi in 5 min, PASSED. Pressured control line @ 6 o'clock postion to 3000 psi, lost 115 psi in 5 min, PASSED. Bled both lines to 0 psi. SV,WV, SSV=C. MV= 0. IA, OA=OTG. 10:30 hrs. 02/18/15 T/I/O= 150/759/5, Conduct PJSM w/crew, install temp#73 and#92 annulus piggy back valves, RDMO Job Ongoing. Final T/I/O= 119/800/5. Page 1 of 2 P2-10, Well History (Pre-Rig Workover) Date Summary 02/18/15 T/I/O = SSV/784/37.Temp= SI. IA&OA FLs, Bleed OAP to 0 psi. (Pre Rig). Wellhouse,flowline&AL line removed. IA FL @ 1020' (20 bbls). OA FL near surface. Bled OAP from 37 psi to 0 psi in < 1 minute. Monitored for 30 min. OAP increased 7 psi. Bled OAP to 0 psi in < 1 min and help open bleed for 1 hour. Monitored for 30 min. OAP increased 2 psi. Final WHPs= SSV/784/2. SV, WV, SSV= C. MV= 0. IA& OA=OTG. 13:45. 02/19/15 T/I/0=120/800/0. Set 4" CIW H-TWC#260. Removed upper tree and installed Temp valve#83 (dry hole tree conversion).Torqued and Pt'd. RDMO. Final T/I/O=TWC/600/0. 02/20/15 T/I/O=TWC/410/10. Temp=SI. WHP's (post bleed). IA&OA have integral installed. No wellhouse, flowline, &scaffolding. IAP increased 25 psi, OAP increased 10 psi since 04:30. SV, MV= C. No SSV. IA, OA=OTG. NOVP. 15:45. 02/20/15 T/I/O=SSV/525/10. Temp = SI. Bleed IAP & OAP to 0 psi. (Pre-Rig). IA FL @ 1020' (20 bbl) &OA FL= Near surface. Well house, flow line&WH scaffold removed, unable to access tree cap for TP. Double casing valves installed on IA&OA, integral flanges installed on IA&OA=inspection not current. See Log for Details. Bled OAP to 0 psi in 10 minutes. Bled IAP from 525 psi to 375 psi in 10 minutes, fluid to surface. IAP increased to 388 psi in 15 minutes, bled gas cap, fluid to surface. See log for details of bleed attempts. 1.8 bbl of fluid returned from IA. Well has PC leak @ 6500'w/LLR of 4.5 bbl per minute @ 808 psi. Final WHP's=SSV/385/0. SV& MV= CLOSED. NO SSV. IA&OA= OTG. NOVP. 04:30. 02/21/15 T/I/O = BPV/415/10. Temp= SI. Bleed IAP&OAP to 0 psi. (Pre Rig). No wellhouse, flowline,AL line or wellhead scaffolding. IA FL @ 420' (8 bbls). OA FL near surface. Double valves installed on IA& OA w/ integrals. IAP increased 5 psi &OAP unchanged overnight. Bled OAP from 10 psi to 0 psi in < 1 min. Bled IAP from 415 psi to 325 psi in 40 min (FTS/-5 gallons). During IA bleed the OAP increased 2 psi. Monitored for 30 min. IAP increased 20 psi & IA FL dropped 110'. Final WHPs= BPV/345/2. SV, MV= C (flagged & BPV tag on MV). IA&OA= OTG. 12:00. Page 2 of 2 North America-ALASKA-BP . Page 1 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/22/2015 08:00 - 18:00 10.00 MOB P PRE MOVE WELL OFF OF P2-59A OVER P2-10, SPOT IN POSITION,AND RIG UP. -MOVE CREW TRAILER AND BULK FUEL OVER TO P2-10. PULL OFF OF P2-59A,PAD OPERATOR WAIVED WITNESS FOR WATCHING RIG PULL OFF WELL. MOVE RIG AROUND TO NORTH WEST SIDE OF PAD,PJSM,SPOT SHIMS AND PULL OVER WELL.OA=0 PSI,IA=36OPSI -RECONFIGURE CELLAR WALLS TO FIT OVER 15'WELL CENTERS,LOWER CELLAR ,DOORS,SPOT CIRCULATION MANIFOLD, CREW TRAILER,BULK FUEL TRAILER, FLOWBACK TANK. -DSM RIG UP HARDLINE TO FLOWBACK TANK TAKE ON 296BBLS OF 9.7PPG BRINE AND HEAT TO 100 DEG. -RIG ACCEPTED @ 15:00 HRS,02/22/2015. 18:00 - 21:00 3.00 KILLW P DECOMP CREW PERFORM H2S RIG EVAC DRILL W/ AAR WALK CREWS THROUGH PRE-SPUD HIGHLIGHTS AND CONCERNS -COMPLETE HAZARD RECOGNITION WORKSHEET/PROCEEDURE FOR CIRCULATION LINEUP FOR UP COMING KWF CIRCULATION.(RECEIVE APPROVAL THROUGH DOYON SUPERINTENDENT TO PROCEED WITH PROCEDURE) 21:00 - 00:00 3.00 KILLW P DECOMP FILL AND TEST CIRCULATION LINES -PJMS,CREWS GO THROUGH PRESSURE CROSSCHECK LIST AND ANSWER ASSOCIATED CHALLENGE QUESTIONS. -WSL WALK LINES WITH DRILLER AND DERRICK HAND. -TEST LINES 250/3500PSI 5 MINUTES EACH (PASSING TEST). -BLOW DOWN LINES TO FLOW BACK TANK IN PREPARATION FOR DSM TO LUBRICATE OUT BPV. 2/23/2015 00:00 - 01:00 1.00 RIGU P DECOMP INSPECT KWF CIRCULATION RIG UP W/NEW CREW IN THE CELLAR AND OUT TO THE FLOW BACK TANK,VERIFY LINE UP. 01:00 - 03:30 2.50 WHSUR P DECOMP RIG UP DSM TO PULL BPV -PJSM,W/DRILL CREW AND DSM. MOBILIZE LUBRICATOR AND TOOLS TO THE FLOOR. -PRESSURE TEST LUBRICATOR T/ 250PSI/3500PSI F/5 MINUTES EACH. -PULL BPV(TBG=640PSI,IA=420PSI). -R/D LUBRICATOR. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 2 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 09:30 6.00 RIGU P DECOMP PJSM.REEVALUATE OPERATION,DEEMED A WELL KILL,NOTA CIRC OUT. JOB STOPPED DUE TO UNCOMFORT WITH THE CIRC OUT SET UP. DECISION MADE TO SWAP MANIFOLDS FROM DUAL CHOKE CIRC OUT MANIFOLD TO STANDARD CIRC OUT CHOKE SKID. -MAKE UP LINES AND PRESSURE TEST @ 250/3500 PSI,5 MIN EACH. 09:30 - 11:30 2.00 KILLW P DECOMP CIRCULATE WELL WITH 9.8 PPG BRINE KWF W/H2S SCAVENGER START JOB W/TBG=640PSI,IA 400PSI -CIRCULATE 290BBLS OF 9.8 PPG BRINE @ 7BPM/ICP=640 PSI,FCP=0 PSI. -110 BBLS RECOVERED FROM FLOW BACK TANK,180 BBLS LOST DURING CIRCULATION. -SLOW PUMP RATES ACQUIRED:30 SPM/90 PSI,40 SPM/160 PSI. -LOSSES TO WELL BORE LAST(12)HOURS= 180 BBLS 9.8 PPG BRINE. 11:30 - 12:00 0.50 KILLW P DECOMP MONITOR WELL -BLOW DOWN LINES TO FLOWBACK TANK -VAC OUT FLOWBACK TANK IA PRESSURE BUILT TO 200PSI,TBG PRESSURE=OPSI 12:00 - 12:30 0.50 KILLW P DECOMP PJSM AND INSPECT LINES/MANIFOLD. -CONTINUE TO EMPTY FLOW BACK TANK INSPECT RIG AND EQUIPMENT. 12:30 - 20:30 8.00 KILLW P DECOMP DISCUSS LOSSES WITH ODE,DECISION MADE TO VISCOSIFY MUD SYSTEM -MIX 1 LB/BBL DUO VIS TO 9.7+PPG BRINE IN PITS TO BRING UP TO A 40 FUNNEL VISCOSITY. ORDER OUT ADDITONAL TRUCK W/290BBLS OF 9.8PPG VISCOSIFIED BRINE FOR WELL CIRCULATION. -HOUSEKEEPING/CON'T T/LOAD AND STRAP 320 JNTS 4"DP,COMPLETE TOP DRIVE/CROWN/DERRICK/INSPECTION AND WORK ORDERS. 20:30 - 22:30 2.00 KILLW P DECOMP CIRCULATE VISCOSIFIED 9.8PPG BRINE KWF INTO WELLBORE CIRC @ 5BPM(250PSI)DOWN THE TUBING TAKING RETURNS OUT THE IA THROUGH CHOKE MANIFOLD BACK TO THE FLOWBACK TANK. -PUMPED 49OBBLS BEFORE SEEING RETURNS OF 9.8PPG FLUID WITH A 40 FUNNEL VISC AT THE IA,ESTABLISHED RETURNS AFTER 118BLS PUMPED AWAY AS INDICATED BY PRESSURE ON THE TUBING AND,161BBLS RETURNED TO FLOWBACK TANK AT THE END OF THE 490BBL CIRCULATION INDICATING 211BBLS OF FLUID LOST DURING CIRCULATION. -SLOW PUMP RATES ACQUIRED:30 SPM @ 90 PSI&40 SPM©160 PSI W/9.8 PPG BRINE. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP • Page 3 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 23:00 0.50 KILLW P DECOMP MONITOR WELLBORE FOR STATIC LOSS RATE AND ANY PRESSURE BUILDUP. -STATIC LOSS RATE=38 BBLS/HR,NO PRESSURE SEEN ON THE TUBING OR IA. 23:00 - 00:00 1.00 KILLW 1 P 1 DECOMP BLOW DOWN LINES AND MANIFOLD BACK TO FLOWBACK TANK. -RIG UP SECOND KILL LINE TO FILL DOWN THE IA MW=9.8PPG BRINE OA=220PSI @ 2330HRS LOSSES FOR 24HRS=637BBLS 9.8 PPG BRINE. 2/24/2015 00:00 - 01:00 1.00 EVAL P DECOMP PJSM.CONTINUE TO RIG UP SECONDARY KILL LINE. '-INSPECT LINES AND VALVE ALIGNMENT IN CELLAR AREA. -ESTABLISH LOSS RATE.31 BPH. 01:00 03:30 2.50 WHSUR r P [ DECOMP PJSM W/DRILL SITE MAINTENANCE CREW. -RIG UP LUBRICATOR.PRESSURE TEST @ 250/3500 PSI/5 MIN/CHARTED. -SET TWO WAY CHECK VALVE.TEST FROM •ABOVE @ 250/3500 PSI/5 MIN EACH/ CHARTED. -PERFORM ROLLING TEST FROM BELOW. 500 PSI,32 BBLS PUMPED AWAY,NO FLOW CONFIRMED,GOOD TEST. RIG DOWN LUBRICATOR AND LAY DOWN SAME. 03:30 - 06:00 2.50 WHSUR P DECOMP PJSM W/FMC AND RIG CREW. -EMPTY TREE OF FLUID,NIPPLE DOWN TREE AND ADAPTER FLANGE. -CHECK THREADS ON HANGER,4 1/2"NSCT, 7 3/4 TURNS,GOOD THREADS. -LOCK DOWN SCREWS.... 4 3/4"OUT&3 3/4"IN.(1)INCH OF TRAVEL. -CONTINUOUS HOLE FILL THROUGHOUT ALL OPERATIONS. 06:00 - 10:00 4.00 BOPSUR P DECOMP PJSM.N/U 11"X 13 5/8"SPACER SPOOL. -N/U 13 5/8"X 5M BOPE.INSTALL RISER IN 'MOUSE HOLE. -SECURE ALL TURN BUCKLES,KOOMEY LINES AND FUNCTION TEST RAMS. -CONTINUOUS HOLE FILL,LOSS RATE=26 BPH. 10:00 - 11:00 1.00 BOPSUR P DECOMP PJSM FOR TESTING BOPE,BODY TEST STACK T/250/3500PSI. 11:00 - 18:30 7.50 BOPSUR P DECOMP TEST BOPE T/250/3500PSI F/5MIN EACH -ANNULAR TESTED W/2-7/8"JNT,UPPER RAMS W/2-7/8"AND 4-1/2"JNT,LOWER RAMS W/4"AND 5-1/2"JNTS. -MAINTAINING FULL WELLBORE BY FILLING DOWN THE IA @ 13-18BPH OF 9.8PPG 40 FUNNEL VISC BRINE. -TEST GOOD,SEE ATTACHED TEST CHART -AOGCC REPRESENTATIVE BOB NOBLE WAIVED WITNESS FEBRUARY 21ST 2015 @ 9:27AM -LOSSES AT NOON=265BBLS -MW=9.8PPG 40 FUNNEL VISCOSITY BRINE Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 4 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 19:00 0.50 BOPSUR P DECOMP BLOW DOWN ALL LINES AND RIG DOWN TEST EQUIPMENT. 19:00 - 21:00 2.00 BOPSUR P DECOMP RIG UP DUTCH RISER SYSTEM,PULL TWC AND VERIFY WELL IS ON A VACCUM RIG UP DSM LUBRICATOR AND PRESSURE TEST T/ 250/3500PSI 5MIN EACH. -PULL TWC. DRAIN STACK,RIG DOWN DSM LUBRICATOR AND PULL DUTCH RISER. 21:00 - 22:30 1.50 BOPSUR N STUC DECOMP ATTEMPT TO PULL TUBING HANGER F/ WELLHEAD -PJSM,P/U AND M/U NSCT LANDING JNT TO HANGER W/7-3/4"TURNS VERIFY WELL IS ON A VACCUM. -FMC BACK OUT LDS FROM 3-3/4"T/4-3/4" INDICATING THE LDS'S ARE IN THE PROPER POSTITION TO PULL THE HANGER. -P/U 100K ON WEIGHT INDICATOR AND SEE INSTANT RESPONSE INDICATING HANGER WAS IN TIGHT,PULL 150K AND SEE HANGER PULL LOOSE BUT THE WEIGHT INDICATOR DOES NOT BREAK OVER. CONTINUE TO WORK OVERPULLS INTO THE SYSTEM,WALKING UP FROM 150KLBS,TO 175KLBS,200KLBS,225KLBS,250KLBS, FINALLY 270KLBS,(80%OF MAX TENSILE FOR THE TUBING)WITHOUT SEEING THE WEIGHT INDICATOR BREAKOVER TO INDICATE FREE PIPE.PIPE STRETCH=8'. 22:30 - 00:00 1.50 BOPSUR N STUC DECOMP CALL ODE,SUPERINTENDENT,AND DISCUSS OPTIONS. -LOSSES AT MIDNIGHT=121 BBLS -MW=9.8PPG 40 FUNNEL VISCOSITY BRINE 2/25/2015 00:00 - 01:30 1.50 FISH N STUC DECOMP CONTINUE MONITORING WELLBORE -WAIT ON E-LINE SERVICES TO ARRIVE FOR JET CUT. -HOUSEKEEPING ON RIG. 01:30 - 03:00 1.50 FISH N STUC DECOMP RE-LAND HANGER,FMC RUN IN LOCK DOWN SCREWS,PJSM,L/D LANDING JNT,FMC INSTALL TWC. -RIG UP TO TEST TWC F/ABOVE T/ 250/3500PSI F/5 MIN EACH. 03:00 - 06:00 3.00 FISH N STUC DECOMP WAIT ON SLB E-LINE UNIT -PREP RIG AND LOCATION FOR E-LINE ARRIVAL. -9BBUHR STATIC LOSSES -MW=9.8PPG BRINE W/40 FUNNEL VISC Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 5 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 16:00 10.00 FISH N STUC DECOMP RIG UP ELINE UNIT W/FULL PRESSURE CONTROL SYSTEM ON RIG FLOOR PJSM,BACK E-LINE UNIT INTO PLACE, STRING E-LINE UP TO FLOOR. STRING E-LINE THROUGH LUBRICATOR AND REMOVE LUBRICATOR GREASE HEAD,BUILD E-LINE HEAD. RIG UP DUTCH RISER SYSTEM AND RILDS. -PRESSURE TEST FULL PRESSURE CONTROL SYSTEM T/250/3500PSI FOR 10MIN. I-BREAK LOOSE SYSTEM AT QUICK TEST SUB AND HANG TO THE SIDE OF RIG FLOOR. LOSSES FOR TOUR=87BBLS OA PRESSURE=OPSI @ 12:00 MW=9.8PPG BRINE 16:00 - 17:30 1.50 FISH N STUC DECOMP PULL TWC -PICK UP DSM LUBRICATOR AND TEST TO 250/3500PSI FOR 5MIN.PULL TWC,RIG DOWN DSM LUBRICATOR,SEND OUT TO TRUCK 17:30 - 22:30 5.00 FISH N STUC DECOMP RIH W/3.65"JET CUTTTER E-LINE ASSEMBLY, LOCATE CUT DEPTH,FIRE CUTTER,POOH M/U 3.65"JET CUTTER TO WEIGHT BARS AND CENTRALIZERS. -PULL FULL PRESSURE CONTROL SYSTEM BACK OVER WELLBORE AND TEST AT QUICK TEST SUB CONNECTION. RIH @ 1820HRS @ 250FPM,LOCATE COLLARS AND ORIGINAL JET CUT W/CCL, MAKE DEPTH SHIFT CORRECTIONS. -SET JET CUTTER ON DEPTH AT 9677'MD AND FIRE CUTTER. -POOH,R/D JET CUTTER AND HANG BACK FULL PRESSURE CONTROL SYSTEM OUT OF THE WAY. 22:30 - 00:00 I 1.50 I FISH N STUC DECOMP PULL TUBING IN WEIGHT INCREMENTS OF 10K OVER CALCULATED STRING WEIGHT UP TO 275KLBS -DRAIN STACK,P/U LANDING JNTAND M/U TO TUBING HANGER. -FMC BACK OUT LDS ON TUBING HANGER. -PULL STRING T/152KLBS(HANGER COMES OFF SEAT). -STAGE OVER PULLS IN 10K INCREMENTS UP TO 275KLBS. -CONTINUE TO OVERPULL PIPE W/NO SUCCESS. LOSSES FOR TOUR=62BBLS OA PRESSURE=OPSI @ 00:00 MW=9.8PPG BRINE 2/26/2015 00:00 - 01:00 1.00 FISH N STUC DECOMP DISCUSS OPTIONS W/BP FIELD SUPERINTENDENT -WORK OVERPULL UP TO 270KLBS SEVERAL TIMES -LAND HANGER,FMC RILDS,L/D LANDING JOINT Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 6 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated©50.13usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 07:30 6.50 FISH N STUC DECOMP !RUN IN HOLE WITH JET CUTTER#2 TO CUT •MID JOINT @ 6353'MD 4TH JOINT BELOW GLM #2 -PULL BACK FULL PRESSURE CONTROL OVER WELL CENTER,RILDS ON DUTCH RISER. RIH W/3.65"JET CUTTER DOWN T/6353'MD, I LOCATING MID JOINT W/CCL LOG,SHIFT LOG ACCORDING TO TALLY. -FIRE JET CUTTER#2,(GOOD INDICATION OF FIRE) POOH W/JET CUTTER#2. 07:30 - 09:00 1.50 FISH P DECOMP I PULL HANGER OFF SEAT,CHECK TO SEE IF TUBING CUT WAS SUCCESSFUL -P/U AND M/U LANDING JOINT INTO TUBING HANGER,FMC BACK OUT LOCK DOWN SCREWS. I-PULL HANGER 20'OFF SEAT W/110K PUW, 100K SOW. . -RE-LAND HANGER,RUN IN LOCK DOWN SCREWS,L/D LANDING JOINT. PJSM,DEMOBILIZE SLB E-LINE EQUIPMENT. 09:00 - 12:00 3.00 FISH P DECOMP [P/U HANGER AND CIRUCULATE A SURFACE TO SURFACE FLUID VOLUME -MN LANDING JOINT,FMC BACK OUT LOCK DOWN SCREWS,P/U HANGER 4',CLOSE ANNULAR PREVENTER. 1-FILL MGS(16BBLS TO FILL)CIRCULATE SURFACE TO SURFACE VOLUME Ca 7BPM 300PSI. -SIMOPS:MOBILIZE SLB SPOOLER TO !FLOOR. LOSSES FOR TOUR=76BBLS MW=9.8PPG BRINE,FUNNEL VISC=40 OA PRESSURE=0 01 12:00PM 12:00 - 12:30 0.50 FISH P DECOMP OBTAIN SPR'S ON PUMP#1 AND#2. 12:30 - 15:00 2.50 FISH P DECOMP PULL HANGER T/RIG FLOOR AND PREP FOR PULLING 4-1/2"13CR TUBING. -BREAK OUT AND L/D LANDING JOINT,BLOW DOWN TOP DRIVE,C/O ELEVATORS,R/U TUBING TONGS,M/U FLOOR VALVE AND SAFETY JOINT. 15:00 - 17:00 2.00 FISH P DECOMP POOH W/12.6#13CR 4-1/2"COMPLETION F/ CUT @ 6353'MD T/5578'MD -SPOOL UP DUAL CAPILLARY CONTROL LINES -PUW=110K,SOW=100K. 17:00 - 18:00 1.00 FISH P DECOMP @ 5578'MD PIT WATCHER/DRILLER NOTICED DISPLACEMENT WAS OFF,INDICATING THAT LOSSES HAD STOPPED.FLOW CHECK WELL, VERIFY FLUID LEVEL STILL DROPPING(WELL ON A VACUUM) -WELL SWABBING DUE TO ANNULAR OBSTRUCTION,CIRCULATE 1 SURFACE TO SURFACE VOLUME @ 5-6BPM 320PSI -SUBSTANTIAL VOLUME OF PARAFFIN COMING BACK ACROSS THE SHAKERS. 18:00 - 18:30 0.50 FISH P DECOMP MONITOR WELL,VERIFY LOSSES©5-6BHP Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 7 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date 3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated©50.13usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 22:30 4.00 FISH P DECOMP .CONTINUE LAYING DOWN 12.6#13CR 4-1/2" COMPLETION W/DUAL CONTROL LINES F/ 5578'MD T/4124'MD -R/D SLB SPOOLER ADN TOOLS,CLEAN AND CLEAR RIG FLOOR,INSTALL STRIPPING RUBBER 22:30 - 00:00 1.50 FISH P DECOMP CONTINUE PULLING 12.6#13CR 4-1/2" COMPLETION W/DUAL CONTROL LINES F/4124'MD T/2583'MD -PUW=70KLBS,SOW=70KLBS LOSSES FOR TOUR=216BBLS MW=9.8PPG BRINE,FUNNEL VISC=40 OA PRESSURE=OPSI 2/27/2015 00:00 - 00:30 0.50 FISH P DECOMP GREASE AND SERVICE RIG EQUIPMENT 00:30 - 04:00 3.50 FISH P DECOMP CONTINUE LAYING DOWN 4-1/2"13CR TUBING F/2583'MD T/SURFACE •-154 FULL JOINTS/1 SSSV/2 GLM'S&20.19' CUT JOINT WITH 4-11/16"OD FLARE. '04:00 - 05:00 1.00 FISH P DECOMP DRAIN STACK AND CLEAN OUT ANY DEBRIS STUCK IN BOP STACK. -RECOVER 4SS BANDS AND MULTIPLE PIECES OF CONTROL LINE. INSTALL 7.25"ID WEAR RING. 05:00 - 08:00 3.00 FISH P DECOMP M/U BAKER FISHING BHA#1(OVERSHOT W/ DRESS OFF SHOE) -PJSM,BUILD BHA,P/U 4.75"HYBRID COLLARS 08:00 - 12:00 4.00 FISH P DECOMP PICK UP 4"DP 1X1 OUT OF PIPE BARN F/ 405'MD T/3089'MD. -PUW=86K,SOW=85K FLUID LOSSES @ 12:00=66BBL MW=9.8PPG BRINE W/40 FUNNEL VISCOSITY OA PRESSRE=OPSI 12:00 - 17:00 5.00 FISH P DECOMP i CONTINUE IN HOLE W/4"DP 1X1 OUT OF I PIPE BARN F/3089'MD T/6279'MD -PUW=135K,SOW=120K,ROT WT=124K© 50RPM FREE TQ=4K 17:00 - 18:00 1.00 FISH P DECOMP LOCATE STUMP,DRESS OFF W/DRESS OFF SHOE,AND ENGAGE OVERSHOT -STUMP LOCATED @ 6341'MD,DRESSED STUMP W/50RPM,3-5K TORQUE,1-3K WOB, 4BPM,310PSI. -PERFORM PRE-JARRING INSPECTION. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 8 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:OOAM Rig Release:3/27/2015 Rig Contractor DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 23:30 5.50 FISH P DECOMP ATTEMPT TO FREE REMAINING 3324'MD OF TUBING FROM JET CUTS @ 9677'MD. -STRETCH PIPE W/50KLBS OVER NEUTRAL WEIGHT AND ATTEMPT TO CIRCULATE @ 4BPM=2700PSI.(LOSSES 5-10BBL/HR W/ CIRCULATING) -CONTINUE T/WORK PIPE AND CIRCULATE, I OVERPULLING IN 10K INCREMENTS UP T/ 150K OVER STRING WEIGHT,(OCCASIONAL PIECES OF PARAFFIN SEEN COMING ACROSS SHAKERS) -BEGIN JARRING PIPE @ 90KLBS OVER NEUTRAL WEIGHT(225KLBS)THEN OVER PULLING T/140K OVER NEUTRAL WEIGHT (225KLBS)FOR 15 LICKS.NO MOVEMENT SEEN WHEN MARKING PIPE.CONTINUE PUMPING @ 4BPM=2700PSI(MARGINAL LOSSES) -INCREASE OVER PULL T/250KLBS T/HIT JARS,THEN OVERPULL 300KLBS AND HOLD F/15 LICKS.NO MOVEMENT SEEN WHEN MARKING PIPE.CONTINUE PUMPING,PUMP PRESSURE FELL OFF T/1700PSI BUT NO MAJOR INCREASE IN PARAFFIN SEEN, 'INCREASE PUMP RATE T/6BPM,BRINE RUNNING OVER SHAKERS,BY-PASS SHAKERS AND PUMP AT 7BPM=2800PSI. -INCRESE OVERPULL T/260KLBS T/HIT JARS,THEN OVERPULL 350KLBS AND HOLD F/15 LICKS.NO MOVEMENT SEEN WHEN MARKING PIPE.CONTINUE T/PUMP AT 7BPM =3000PSI CONTINUE JARRING @ 260KLBS, INCREASING TO MAX OVERPULL OF 365KLBS WHILE CIRCULATING©7BPM=3000PSI F/60 LICKS.NO MOVEMENT SEEN. CALL ODE AND DISCUSS PLAN FORWARD 23:30 - 00:00 0.50 FISH P DECOMP RELEASE BAKER FISHING BHA#1 FROM 4.5" TUBING,BLOW DOWN TOP DRIVE AND MONITOR WELL. FLUID LOSSES @ 00:00=114BBL MW=9.8PPG BRINE W/40 FUNNEL VISCOSITY OA PRESSRE=155PSI 2/28/2015 00:00 - 00:30 0.50 FISH P DECOMP SERVICE RIG. -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. 00:30 - 05:00 4.50 FISH P DECOMP POOH F/6353'MD T/SURFACE W/BAKER FISHING BHA#1 -MONITOR WELL PRIOR TO PULLING BHA THROUGH STACK. 05:00 - 06:30 1.50 FISH P DECOMP L/D BAKER FISHING BHA#1T/PIPE SHED STAND BACK 4 HYBRID DRILL COLLARS 06:30 - 07:30 1.00 FISH P DECOMP CLEAN AND CLEAR RIG FLOOR IN PREPARATION FOR PICKING UP BAKER FISHING BHA#2(INSIDE CUTTER) Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 9 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UW:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:30 - 09:00 1.50 FISH P DECOMP M/U INSIDE CUTTER BHA#2,W/BAKER FISHING. -LOAD AND R/U 2-7/8"EQUIPMENT. 09:00 - 12:00 3.00 FISH P DECOMP RIH W/2-7/8"PAC HT DRILL PIPE 1X1 F/PIPE SHED T/1735'MD -M/U 2-7/8"PAC HT CONNECTIONS TO 4700FT/LBS FLUID LOSSES @ 12:00=34BBLS MW=9.8PPG BRINE,40 FUNNEL VISC OA=155PSI 12:00 - 12:30 0.50 FISH P DECOMP SERVICE RIG. -PJSM W/"A"CREW F/TRIP IN HOLE -LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. -INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. 12:30 - 17:30 5.00 FISH P DECOMP CONTINUE T/RIH W/2-7/8"PAC HT DRILL PIPE 1X1 F/PIPE SHED T/1960'MD X-OVER T/ 4"DRILL PIPE OUT OF DERRICK T/8268'MD -PUW=153KLBS,SOW=124KLBS -MN 2-7/8"PAC HT CONNECTIONS TO ..4700FT/LBS 17:30 - 00:00 6.50 FISH N WAIT DECOMP SHUT DOWN RIG OPERATIONS DUE TO INCLEMENT WEATHER,PHASE 3 CONDITIONS ACROSS THE SLOPE FLUID LOSSES @ MIDNIGHT=27BBLS MW=9.8PPG BRINE,40 FUNNEL VISC OA=155PSI 3/1/2015 ,00:00 - 12:00 12.00 FISH N WAIT DECOMP WAIT ON INCLEMENT WEATHER,PHASE 3 CONDITIONS. -LOSSES TO THE WELL=26BBLS -MW=9.8PPG BRINE,40 FUNNEL VISCOSITY -OA PRESSURE=20PSI 12:00 - 16:30 4.50 FISH N WAIT DECOMP CONTINUE WAITING ON INCLEMENT FWEATHER,PHASE 3 CONDITIONS. 16:30 - 17:30 1.00 FISH P DECOMP !PERFORM INSIDE CUT W/BAKER FISHING BHA#2 @ 8263'MD -PUW=153KLBS,SOW=124KLBS,ROT WT= 136KLBS,FREE TQ @ 90 RPM=7K FT-LBS. -CUT 4.5"TUBING @ 8263'MD,PUMPING 5.5BPM(4)2480PSI,(SAW 200PSI DROP IN PRESSURE INDICATING CUT,CONTINUE l CUTTING FOR 5MINS TO ENSURE PIPE CUT _ IS COMPLETELY THROUGH) 17:30 - 19:30 2.00 FISH P DECOMP LAY DOWN 2 JOINTS,BLOW DOWN TOP DRIVE,RIG UP BELLY BOARD AND MOVE 4-3/4"DRILL COLLARS TO OFF DRILLERS SIDE 19:30 - 21:30 2.00 FISH P DECOMP CUT AND SLIP 60'OF DRILL LINE,INSPECT DRAIMNORKS Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 10 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre j Site:Pt Mac 2 Rig Name/No.:DOYON 16 I Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 21:30 - 00:00 ~ 2.50 FISH P DECOMP POOH WITH BAKER FISHING BHA#2 F/ 8214'MD T/5718'MD -@ 8214'MD PUW=153KLBS,SOW= 124KLBS,@ 5718'MD PUW=110KLBS,SOW= 103KLBS FLUID LOSSES @ 12:00=34BBLS MW=9.8PPG BRINE,40 FUNNEL VISC OA=50PSI 3/2/2015 00:00 - 00:30 0.50 FISH P DECOMP SERVICE RIG. ,-LUBRICATE TOP DRIVE,ST-80 AND BLOCKS. I-INSPECT AND SERVICE PIPE SKATE RIG FLOOR EQUIPMENT. -CROWN-O-MATIC AND SPCC CHECKS- GOOD. 00:30 - 03:00 2.50 FISH P DECOMPCONTINUE T/POOH W/BAKER FISHING BHA #2 ON 4"DP F/5718'MD T/1960'MD. 03:00 - 06:00 3.00 FISH - ,DECOMP CHANGE OUT SLIPS,ELEVATORS,T/2-7/8" PAC HT HANDLING GEAR,CONTINUE POOH, UD BAKER BHA#2. 06:00 - 06:30 0.50 FISH DECOMP M/U BAKER FISHING OVERSHOT BHA#3 06:30 - 10:00 3.50 FISH P DECOMP RIH F/400'T/5611'MD ON 4"DRILL PIPE STANDS OUT OF THE DERRICK 10:00 - 10:30 0.50 FISH P DECOMP KICK WHILE TRIPPING DRILL -SIMULATE A SUPERCHOKE FAILURE,LINE UP CHOKE MANIFOLD ON MANUAL. -PERFORM AAR. 10:30 - 11:30 1.00 FISH P DECOMP CONTINUE T/RIH ON 4"DRILL PIPE STANDS OUT OF THE DERRICK F/5611'MD T/6274'MD, ENGAGE FISH AND PULL FREE -M/U TOP DRIVE ON STAND#63 AND ESTABLISH PARAMETERS. -PUW=138KLBS,SOW=120KLBS,ROT WT= 126KLBS,FREE TQ=3K,RPM=20 -TAG TOP OF STUMP @ 6341'MD,ENGAGE AS PER BAKER REP. -PULL UP TO 138KLBS AND THEN WORK UP IN 20K INCREMENTS.PIPE PULLS FREE @ 210KLBS - 11:30 - 13:00 1.50 FISH P DECOMP !CIRCULATE BOTTOMS UP @ 3BPM=260PSI I THROUGH 4-1/2"TUBING CUT @ 8263'MD -MONITOR WELL,VERIFY LOSSES=1-2 BPH. FLUID LOSSES @ 12:00=36BBLS MW=9.8PPG BRINE,40 FUNNEL VISC OA=50PSI i 13:00 - 13:30 0.50 FISH P DECOMP I MOBILIZE TUBING TONGS T/RIG FLOOR, BLOW DOWN TOP DRIVE,PJSM FOR POOH 13:30 - 18:00 4.50 - FISH P DECOMP POOH W/4.5"TUBING FISH ON 4"DP F/ 8263'MD -PUW=167KLBS. 18:00 - 22:00 4.00 FISH P DECOMP CROSS OVER TO USING 4-1/2"TUBING HANDLING EQUIPMENT AND POOH W/FISH -L/D 46 JOINTS OF 12.6#4-1/2"NSCT TUBING, 1 GLM,TOP CUT JOINT=24.28'MD,BOTTOM CUT=5.35'MD. Printed 4/6/2015 9•59 39AM North America-ALASKA-BP Page 11 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. I UWI:500292288600 Active datum:P2-10 Updated©50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 22:00 - 00:00 2.00 FISH P DECOMP LAY DOWN BAKER FISHING BHA#3 AND RELEASE 4.5"TUBING FISH,R/D TUBING HANDLING EQUIPMENT CLEAR RIG FLOOR,MOBILIZE 2-7/8"TUBING TONGS/ELEVATORS. -BREAK DOWN 4.5"FLOOR VALVE AND M/U 2-7/8"FLOOR VALVE. FLUID LOSSES ©12:00=72BBLS 1 MW=9.8PPG BRINE,40 FUNNEL VISC OA=40PSI 3/3/2015 '00:00 - 00:30 0.50 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. 00:30 - 01:00 0.50 FISH P DECOMP PJSM.M/U BAKER MULTISTRING CUTTER BHA#4. 01:00 - 08:30 7.50 FISH P DECOMP RIH VITH BAKER MULTISTRING CUTTER BHA #4. -RIH WITH 2-7/8"PAC FROM DERRICK FROM SURFACE TO 1,143'MD.(12 STANDS) -R/U 4"DRILL PIPE RUNNING EQUIPMENT. -RIH WITH 4"DRILL PIPE FROM DERRICK FROM 1,143'MD TO 7,397'MD. -CONTINUE RIH ON 4"DP FROM SHED,FROM _ 7,397'MD TO 9,354'MD. 08:30 - 09:30 1.00 FISH P DECOMP CUT 4-1/2"TUBING AS PER BAKER REPRESENTATIVE. -ACQUIRE SLOW CIRCULATING RATES. -ESTABLISH PARAMETERS AT 9,354'MD: 1 PUW=175 KLBS,SOW=137 KLBS,ROT.WT. =153 KLBS,FREE TORQUE=7 FT-KLBS,RPM =60,PUMP AT 4.5 BPM=1,800 PSI. -PERFORM CUT AT 9,354'MD. 09:30 - 11:00 1.50 FISH P DECOMP CIRCULATE BOTTOMS UP. -PUMP AT 5 BPM=2,000 PSI. -SHUT DOWN PUMPS AND MONITOR WELL FOR(10)MINUTES.WELL STABLE. -BLOW DOWN TOP DRIVE. 11:00 - 12:00 1.00 FISH P DECOMP POOH WITH BAKER MULTISTRING CUTTER BHA#4. -POOH WITH 4"DRILL PIPE FROM 9,354'MD TO 7,966'MD,STANDING BACK IN DERRICK PUW=152 KLBS,SOW=123 KLBS. FLUID LOSS PAST(12)HOURS=36 BBLS 9.8 PPG BRINE. OA=40 PSI. 12:00 - 12:30 0.50 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. 12'30 - 20:00 7.50 FISH P DECOMP POOH WITH BAKER MULTISTRING CUTTER BHA#4. -POOH WITH 4"DRILL PIPE FROM 7,966'MD TO 1,143'MD,STANDING BACK IN DERRICK R/U 2-7/8"PAC PIPE EQUIPMENT. -POOH WITH 2-7/8"PAC FROM 1,143'MD TO SURFACE,STANDING BACK IN DERRICK -UD BAKER MULTISTRING CUTTER BHA#4. 20 00 - 20:30 0.50 BOPSUR P DECOMP DRAIN BOPE STACK AND PULL WEAR RING. • Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 12 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 ' Spud Date/Time:5/19/1998 12:00:OOAM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 22:00 1.50 BOPSUR P DECOMP 'PJSM.R/U TO TEST 13-5/8"BOPE AND RELATED EQUIPMENT. -R/U 2-7/8",4",4-1/2"AND 5-1/2"TEST JOINTS. -INSTALL TEST PLUG. -FILL BOPE WITH FRESH WATER AND . PERFORM BODY TEST. 22:00 - 00:00 2.00 BOPSUR P DECOMP PJSM.TEST FOUR PREVENTER 13-5/8"5M BOPE AND RELATED EQUIPMENT. -TEST BOPE ACCORDING TO AOGCC REGULATIONS,DOYON AND BP PROCEDURES. -TEST ANNULAR WITH 2-7/8"TEST JOINT TO 250 PSI LOW,3,500 PSI HIGH FOR 5 CHARTED MINUTES. FLUID LOSS PAST(24)HOURS=69 BBLS 9.8 ' PPG BRINE. OA=40 PSI. , 3/4/2015 00:00 - 04:00 4.00 BOPSUR P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. CROWN-O-MATIC AND SPCC CHECKS GOOD. PJSM.TEST FOUR PREVENTER 13-5/8"5M BOPE AND RELATED EQUIPMENT. -TEST UPPER 2-7/8"X 5"VARIABLE RAMS WITH 2-7/8"AND 4-1/2"TEST JOINTS TO 250 PSI,3,500 PSI HIGH FOR 5 CHARTED MINUTES. ; -TEST LOWER 3-1/2"X 6"VARIABLE RAMS WITH 4"AND 5-1/2"TEST JOINTS TO 250 PSI, 3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST BLIND RAMS,FLOOR VALVES,AND CHOKE MANIFOLD TO 250 PSI,3,500 PSI HIGH I FOR 5 CHARTED MINUTES. -PERFORM ACCUMULATOR DRAW DOWN TEST WITH WSL PRESENT. -MPL TEST ALL RAMS. -NO FAILURES. ' -LOUIS GRIMALDI OF AOGCC WAIVED WITNESS OF BOPE TEST ON 03/03/2015 AT 06:51 HRS VIA EMAIL. 04:00 - 05:00 1.00 BOPSUR P DECOMP BLOW DOWN AND RIG DOWN TEST EQUIPMENT. -PULL TEST PLUG. 05:00 - 05:30 0.50 BOPSUR P DECOMP INSTALL WEAR RING,ID=7.25". -FMC RILDS. -M/U SAFETY JOINT. 05:30 - 07:00 1.50 FISH P DECOMP PJSM.M/U BAKER OVERSHOT BHA#5. I -P/U(4)STAND 4-3/4"DRILL COLLARS. -RIH FROM SURFACE TO 416'MD. 07:00 - 11:00 4.00 FISH P DECOMP RIH WITH BAKER OVERSHOT BHA#5. -RIH FROM 416'MD TO 8,249'MD. -ACQUIRE SLOW CIRCULATING RATES. I -ESTABLISH PARAMETERS:PUW=175 KLBS, SOW=128 KLBS,ROT.WT.=152 KLBS,FREE TORQUE=7 FT-KLBS. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 13 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated©50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:00 1.00 FISH P DECOMP RIH AND ENGAGE FISH AT 8,263'MD. -PULL 50 KLBS OVER. -JAR(1)TIME TO FREE FISH.PUW=180 . KLBS. FLUID LOSS PAST(12)HOURS=31 BBLS 9.8 PPG BRINE. OA=30 PSI. 12:00 - 14:00 2.00 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. PJSM.PUMP 40 BBL DEEP CLEAN PILL. -PUMP AT 3 BPM=1,640 PSI. -MONITOR WELL FOR(10)MINUTES.WELL STABLE.LOSS RATE=3 BPH. 14:00 - 17:30 3.50 FISH P DECOMP POOH WITH BAKER OVERSHOT BHA#5. -PUMP OUT OF HOLE AT 2-4 BPM=400-600 PSI. ACQUIRE SLOW CIRCULATING RATES. 1-POOH FROM 8,249'MD TO 7,017'MD.PUW= 200-210 KLBS. 17:30 - 18:00 0.50 FISH P DECOMP POOH WITH BAKER OVERSHOT BHA#5 ON ELEVATORS. -BLOW DOWN TOP DRIVE. I-LINE UP FOR CONTINUOUS HOLE FILL. 1-POOH FROM 7,017'MD TO 6,710'MD. '18:00 - 18:30 0.50 FISH i P DECOMP D-1 KICK WHILE TRIPPING DRILL. -GOOD RESPONSE TIME BY CREW TO SECURE WELL. 18:30 - 21:00 2.50 FISH N RREP DECOMP REPLACE LINK TILT STUD AND LINK TILT HYDRAULIC HOSES. 21:00 - 00:00 ' 3.00 i FISH P DECOMP PJSM.POOH WITH BAKER OVERSHOT BHA ; #5. -POOH FROM 6,710'MD TO 1,038'MD.PUW= 71 KLBS,SOW=75 KLBS. FLUID LOSS PAST(24)HOURS=129 BBLS 9.8 PPG BRINE. I OA=40 PSI. 3/5/201500:00 00:30 0.50 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS I AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. 00:30 - 01:00 0.50 FISH P DECOMP PJSM.POOH WITH BAKER OVERSHOT BHA #5. -POOH FROM 1,038'MD TO 416'MD. -MONITOR WELL FOR(10)MINUTES. 01:00 - 02:00 1.00 FISH P DECOMP STAND BACK HYBRID DRILL COLLARS. -L/D BAKER OVERSHOT BHA#5. 02:00 - 03:30 ' 1.50 FISH P DECOMP PJSM.POOH WITH 4-1/2"12.6#13-CR NSCT TUBING. -R/U 4-1/2"EQUIPMENT ON RIG FLOOR. -MAKE UP FOSV CROSS OVER TO 4-1/2" 12.6#13-CR NSCT TUBING. -RECOVERED:(25)FULL JOINTS,(1)GLM, BOTTOM CUT JOINT=29.83'. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 14 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor.DOYON DRILLING INC. U1M:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To I Hrs Task I Code I NPT NPT Depth Phase Description of Operations 03:30 05:30 2.(r) usft) 00 FISH P DECOMP PJSM.M/U BAKER OVERSHOT BHA#6. -DISENGAGE FISH AND UD TOP CUT JOINT= 34.42'. CHANGE OUT GRAPPLE. -RIH FROM SURFACE TO 420'MD. 05:30 - 12:00 6.50 FISH P DECOMP RIH WITH BAKER OVERSHOT BHA#6. -RIH FROM 420'MD TO 8,380'MD.PUW=180 KLBS,SOW=133 KLBS. 12:00 - 12:30 0.50 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. -VACUUM OUT DRAWORKS SUMP. 12:30 - 16:00 3.50 FISH P DECOMP RIH WITH'BAKER OVERSHOT BHA#6. -WASH DOWN FROM 8,380'MD TO 9,327'MD. -PUMP AT 7 BPM=730 PSI,ROT AT 70 RPM= 5 FT-KLBS,PUW=193 KLBS,SOW=140 KLBS,ROT.WT.=155 KLBS. 16:00 - 17:00 1.00 FISH P DECOMP CIRCULATE 2X BOTTOMS UP AT 7 BPM= 880-900 PSI. -HOLE UNLOADED APPROXIMATELY 4 TONS OF SAND. 17:00 - 18:30 1.50 FISH P DECOMP .SLIP AND CUT 72'OF DRILLING LINE. 18:30 - 19:30 1.00 FISH P DECOMP WASH DOWN AT 6 BPM=750 PSI. -TAG TOP OF 4-1/2"FISH AT 9,354'MD. -P/U 3'AND CIRCULATE 1.5 BOTTOMS UP UNTIL RETURNS CLEAN OF SAND AT 7 BPM= 820 PSI. 19:30 - 00:00 4.50 FISH P DECOMP PJSM.ENGAGE AND JAR 4-1/2"FISH. -WASH DOWN OVER TOP OF 4-1/2"TUBING STUB AT 3 BPM=1,180 PSI. -ENGAGE FISH WITH 25 KLBS DOWN THEN j P/U TO 10 KLBS OVER STRING WEIGHT TO VERIFY ENGAGEMENT. -REDUCE PUMPS DOWN TO 1 BPM=2,020 PSI. -STAGE PUMPS UP SLOWLY FROM 1 BPM= i 2,020 PSI TO 6 BPM=2,350 PSI AND WORK PIPE UP AND DOWN. -PERFORM PRE-JARRING INSPECTION. i-BEGIN JARRING 4-1/2"FISH AT 250-300 KLBS,THEN STRAIGHT PULL TO 350-375 KLBS. -PERFORMING DERRICK INSPECTIONS EVERY 15 HITS. FLUID LOSS PAST(24)HOURS=225 BBLS 9.8 PPG BRINE. OA=230 PSI. 3/6/2015 00:00 - 00:30 0.50 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. 00:30 - 07:00 6.50 FISH P DECOMP PJSM.JAR 4-1/2"12.6#13-CR TUBING FISH. -JAR 4-1/2"FISH AT 250-300 KLBS,THEN STRAIGHT PULL TO 350-375 KLBS. -CIRCULATE DURING JARRING OPERATIONS AT 7 BPM=700-2,000 PSI. -PERFORMING DERRICK INSPECTIONS EVERY 15 HITS. -TOTAL HITS=145 HITS. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 15 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 07:30 0.50 FISH P DECOMP DECISION MADE TO RELEASE OVERSHOT AND POOH. -RELEASE OVERSHOT,BLOW DOWN TOP DRIVE. TOP OF FISH AT 9,329'MD. -ACQUIRE SLOW CIRCULATING RATES. -MONITOR WELL FOR(10)MINUTES.WELL STABLE. 07:30 - 12:00 4.50 FISH P DECOMP PJSM.POOH WITH BAKER OVERSHOT BHA #6. -POOH FROM 9,327'MD TO 420'MD. -MONITOR WELL FOR(10)MINUTES.WELL ;STABLE. FLUID LOSS PAST(12)HOURS=107 BBLS 9.8 PPG BRINE. OA=460 PSI. 12:00 - 14:00 2.00 FISH P ' DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. CROWN-O-MATIC AND SPCC CHECKS GOOD. PSJM.IJD BAKER OVERSHOT BHA#6. STAND BACK HYBRID DRILL COLLARS. 14:00 - 14:30 0.50 FISH P DECOMP -R/D 4-1/2"POWER TONGS AND EQUIPMENT. -R/U 2-7/8"POWER TONGS AND EQUIPMENT. 14:30 16:00 1.50 FISH I P DECOMP PJSM.M/U BAKER CUTTER BHA#7. RIH FROM SURFACE TO 230'MD. 16:00 - 00:00 8.00 FISH P DECOMP RIH WITH BAKER CUTTER BHA#7. -RIH FROM 230'MD TO 9,388'MD AND TAG FILL.(TOP OF STUMP AT 9,329'MD BUT DID NOT SEE WEIGHT INCREASE.) -WASH DOWN FROM 9,388'MD AT 1 BPM= 330 PSI TO 9,456'MD.PUW=293 KLBS,SOW =135 KLBS. ACQUIRE SLOW CIRCULATING RATES. -ATTEMPT TO KEEP WASHING DOWN, UNSUCCESSFUL. -DISCUSS WITH ODE,DECISION MADE TO MAKE CUT ON 4-1/2"CASING AT 9,454'MD. THIS DEPTH IS 9'IN ON 3RD JOINT BELOW GLM#5. FLUID LOSS PAST(24)HOURS=134 BBLS 9.8 PPG BRINE. OA=230 PSI. 3/7/2015 00:00 - 01:30 1.50 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. CIRCULATE UNTIL RETURNS ARE CLEAN OF SAND. -PUMP AT 4.5 BPM=1,450 PSI. 01:30 - 02:30 1.00 FISH P DECOMP PJSM.CUT 4-1/2"12.6#13-CR TUBING. -OBTAIN PARAMETERS:PUW=195 KLBS, SOW=135 KLBS,ROT.WT.=158 KLBS,FREE TORQUE=7-8 FT-KLBS,RPM=60. ACQUIRE SLOW CIRCULATING RATES. -CUT 4-1/2"TUBING AT 9,454'MD AS PER BAKER REPRESENTATIVE. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 16 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:OOAM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 08:00 5.50 FISH P DECOMP PJSM.POOH WITH BAKER CUTTER BHA#7. -POOH FROM 9,454'MD TO 229'MD. -MONITOR WELL FOR(10)MINUTES.WELL STABLE. 08:00 - 09:00 1.00 FISH P DECOMP PJSM.UD BAKER CUTTER BHA#7. -CHANGE OUT TO 2-7/8"RIG FLOOR EQUIPMENT. -STAND BACK 2-7/8"PAC. -L/D BAKER CUTTER BHA#7. CLEAR AND CLEAN RIG FLOOR. 09:00 - 12:00 3.00 FISH P DECOMP PJSM.M/U BAKER OVERSHOT BHA#8. -L/D HWDP AND REPLACE WITH DRILL COLLARS. RIH FROM SURFACE TO 326'MD. FLUID LOSS PAST(12)HOURS=32 BBLS 9.8 PPG BRINE. OA=130 PSI. 12:00 - 13:00 1.00 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. 13:00 - 18:30 5.50 FISH P DECOMP PJSM.RIH WITH BAKER OVERSHOT BHA#8. -RIH FROM 326'MD TO 9,230'MD. -WASH DOWN AT 7 BPM=1,050 PSI FROM 9,230'MD TO 9,332'MD. -TAG TOP OF STUMP AT 9,332'MD.PUW= 195 KLBS,SOW=135 KLBS. 18:30 - 19:00 0.50 FISH P DECOMP ENGAGE FISH AND SWALLOW 10'TO NO-GO AT 9,342'MD. -SET DOWN 25 KLBS AND P/U WITH 6 KLBS OVER PULL,PUW=201 KLBS. 19:00 - 20:00 1.00 FISH P DECOMP CIRCULATE BOTTOMS UPAT7.5 BPM=1,170 PSI UNTIL RETURNS CLEAR OF SAND. -ACQUIRE SLOW CIRCULATING RATES. '-NOTED SOME SAND AT BOTTOMS UP. -SHUT DOWN AND MONITOR WELL FOR(10) MINUTES.WELL STABLE. 20:00 - 00:00 4.00 FISH P DECOMP PJSM.POOH WITH BAKER OVERSHOT BHA #8 AND FISH. -POOH FROM 9,342'MD TO 1,463'MD. FLUID LOSS PAST(24)HOURS=44 BBLS 9.8 PPG BRINE. OA=230 PSI. 3/8/2015 00:00 - 00:30 0.50 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. 00:30 - 01:00 0.50 FISH P DECOMP PJSM.POOH WITH BAKER OVERSHOT BHA #8 AND FISH. -POOH FROM 1,463'MD 327'MD. -MONITOR WELL FOR(10)MINUTES.WELL STABLE. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 17 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500.000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 1 (usft) 01:00 - 04:30 2.50 FISH P DECOMP PJSM.L/D BAKER OVERSHOT BHA#8 AND FISH. I-STAND BACK DRILL COLLARS. -UD OVERSHOT BHA#8. -M/U X-O FOR FOSV TO 4-1/2"NSCT TUBING. -UD 4-1/2"12.6#13-CR TUBING.RECOVERED: (1)#5 GLM,(2)FULL JOINTS,LOWER CUT JOINT=6.46',UPPER CUT JOINT=7.80'. -CLEAR AND CLEAN RIG FLOOR. 04:30 - 06:30 2.00 FISH P DECOMP PJSM.M/U BAKER WASHOVER BHA#9. -RIH FROM SURFACE TO 478'MD. 06:30 - 12:00 5.50 FISH P DECOMP RIH WITH BAKER WASHOVER BHA#9. -CIRCULATE DRILL PIPE VOLUME EVERY 2,000'. RIH FROM 478'MD TO 8,059'MD.PUW=170 KLBS,SOW=125 KLBS. -ACQUIRE SLOW CIRCULATING RATES. FLUID LOSS PAST(12)HOURS=5 BBLS 9.8 PPG BRINE.'" OA=65 PSI. 12:00 - 12:30 0.50 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS !GOOD. 12:30 - 14:30 2.00 FISH P DECOMP PJSM.RIH WITH BAKER WASHOVER BHA#9. RIH FROM 8,059'MD TO 9,477'MD. -WASH DOWN FROM 9,477'MD TO 9,579'MD, PUMP AT 7 BPM=1,170 PSI.PUW=185 KLBS, I SOW=130 KLBS. 14:30 - 17:00 2.50 FISH P DECOMP CIRCULATE 40 BBL HI-VIS SWEEPAT ICR 4 BPM=600 PSI,FCR 7 BPM=1,400 PSI. -CIRCULATE UNTIL NO SAND OVER SHAKERS. -MONITOR WELL FOR(10)MINUTES.WELL STABLE. 17:00 - 17:30 i 0.50 FISH P DECOMP PJSM.POOH WITH BAKER WASHOVER BHA #9. -POOH FROM 9,579'MD TO 9,101'MD. 17:30 - 19:30 2.00 FISH P DECOMP SLIP AND CUT 68'OF DRILLING LINE. I-CHECK AND ADJUST BRAKES. -CLEAR AND CLEAN RIG FLOOR. 19:30 - 00:00 4.50 FISH P DECOMP PJSM.POOH WITH BAKER WASHOVER BHA #9. -POOH FROM 9,101'MD TO 573'MD. -MONITOR WELL FOR(10)MINUTES.WELL STABLE. FLUID LOSS PAST(24)HOURS=17 BBLS 9.8 PPG BRINE. OA=70 PSI. 3/9/2015 00:00 - 00:30 0.50 FISH P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. PJSM.POOH FROM 573'MD TO 478'MD. -MONITOR WELL FOR(10)MINUTES.WELL STABLE. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 18 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) _ Date From-To Hrs Task Code j NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 02:00 1.50 FISH P DECOMP PJSM.UD BAKER WASHOVER BHA#9. -STAND BACK DRILL COLLARS. -UD WASHPIPE AND BHA#9. 02:00 - 02:30 0.50 FISH P DECOMP CLEAR AND CLEAN RIG FLOOR. 02:30 - 03:30 1.00 FISH P DECOMP PJSM.M/U BAKER OVERSHOT BHA#10. -RIH FROM SURFACE TO 327'MD. 03:30 - 09:00 5.50 FISH P DECOMP RIH WITH BAKER OVERSHOT BHA#10. -RIH FROM 327'MD TO 9,457'MD.TAG TOP OF FISH AT 9,457'MD. -ACQUIRE SLOW CIRCULATING RATES. ,-ESTABLISH PARAMETERS:PUW=204 KLBS, SOW=134 KLBS,ROT.WT.=160 KLBS,FREE TORQUE=8 FT-KLBS,RPM=60. 09:00 - 12:00 3.00 FISH P DECOMP ENGAGE FISH AND JAR AS PER BAKER REPRESENTATIVE. -ATTEMPT TO CIRCULATE ONCE ENGAGE, UNSUCCESSFUL. -BEGIN JARRING AT 235 KLBS AND WORK UP TO 295 KLBS.STRAIGHT PULL TO 375 KLBS. I FLUID LOSS PAST(12)HOURS=12 BBLS 9.8 PPG BRINE. OA=75 PSI. 12:00 - 12:30 0.50 FISH P DECOMP "PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. 12:30 - 14:30 2.00 FISH, P DECOMP PJSM.JAR FISH AS PER BAKER REPRESENTATIVE. -WORK AND JAR DOWN ON FISH. -JARRING AT 295 KLBS.STRAIGHT PULL TO 375 KLBS. 14.30 - 15:30 1.00 FISH N WAIT DECOMP CONTACT ODE TO DISCUSS PLAN FORWARD. 15:30 - 17:00 1.50 FISH P DECOMP PJSM.RELEASE FROM FISH AS PER BAKER REPRESENTATIVE. -CIRCULATE BOTTOMS UP AT 8 BPM=1,280 PSI. -MONITOR WELL FOR(10)MINUTES.WELL STABLE. 17.00 - 21:00 4.00 FISH P DECOMP POOH WITH BAKER OVERSHOT BHA#10. -POOH FROM 9,457'MD TO 428'MD. -MONITOR WELL FOR(10)MINUTES.WELL STABLE. 21:00 - 23:00 2.00 FISH P DECOMP PJSM.UD BAKER OVERSHOT BHA#10. -CLEAR AND CLEAN RIG FLOOR. 23.00 - 00:00 1.00 FISH P DECOMP PJSM.M/U BAKER CLEANOUT BHA#11. FLUID LOSS PAST(24)HOURS=24 BBLS 9.8 PPG BRINE. OA=30 PSI. 3/10/2015 00:00 - 00:30 0.50 FISH P DECOMP 'PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. 00:30 - 06:00 5.50 FISH P DECOMP PJSM.RIH WITH BAKER CLEANOUT BHA#11. -RIH FROM SURFACE TO 614'MD 9,426'MD. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 19 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. I UWI:500292288600 Active datum:P2-10 Updated©50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 FISH P DECOMP -ESTABLISH PARAMETERS:PUW=200 KLBS, SOW=136 KLBS,ROT.WT.=160 KLBS,FREE TORQUE=9 FT-KLBS,RPM=40. -ACQUIRE SLOW CIRCULATING RATES. -WASH DOWN FROM 9,426'MD TO 9,660'MD. PUMP AT 6 BPM=1,250 PSI. -PUMP(3)40 BBL HI-VIS SWEEPS. -TAG HARD BOTTOM AT 9,660'MD AND SET DOWN 10 KLBS. -P/U AND ATTEMPT TO ROTATE PAST 9,660' MD(2)TIMES HARD TAG.ROTATE AT 9,660' I MD FOR(5)MINUTES. FLUID LOSS PAST(12)HOURS=33 BBLS 9.8 PPG BRINE. OA=20 PSI. 12:00 - 13:00 1.00 FISH P DECOMP PJSM.CIRCULATE UNTIL RETURNS ARE CLEAN AT 6 BPM=1,230 PSI. -MONITOR WELL FOR(10)MINUTES.WELL STABLE. 13:00 - 14:00 1.00 FISH P DECOMP I BLOW DOWN TOP DRIVE. -POOH FROM 9,655'MD TO 9,550'MD. -WAIT ONE HOUR AND MONITOR WELL. WELL STABLE. - 16:30 2.50 FISH --. RIH A 14:00 P DECOMP � WITH BAKER CLEAN OUT BHA#11. -HARD TAG AT 9,660'MD.PUW=200 KLBS, SOW=140 KLBS. -ROTATE AT 20 RPM,6 BPM=1,230 PSI WITH WOB=3 KLBS.ROTATE FOR(5)MINUTES. -ROTATING TORQUE OFF BOTTOM=7K FT/LBS,ROTATING WT=165K LBS. -CONTINUE RIH TO 9,697'MD. -ATTEMPT TO POOH,HAD TO JAR OUT OF HOLE TO 9,668'MD. -30-50K OVERPULLING. -POOH TO 9,644'MD AND CIRCULATE. -RIH TO 9,690'MD,NO ROTATION,DID NOT TAKE ANY WEIGHT. 16:30 - 18:00 1.50 FISH P DECOMP POOH TO 9,644'MD AND CIRCULATE UNTIL RETURNS ARE CLEAN. -PUMP AT 6 BPM=1,170 PSI. -MONITOR WELL FOR(10)MINUTES.WELL STABLE. 18:00 - 23:00 5.00 FISH P DECOMP PJSM.POOH WITH BAKER CLEANOUT BHA #11. -POOH FROM 9,644'MD TO 9,457'MD.NOTE 20-30 KLBS OVERPULL. -POOH FROM 9,457'MD TO 600'MD. -MONITOR WELL FOR(10)MINUTES.WELL STABLE. 23:00 - 00:00 1.00 FISH P DECOMP PJSM.L/D BAKER CLEANOUTBHA#11. -FLUID LOSS PAST(24)HOURS=47 BBLS 9.8 PPG BRINE. OA=40 PSI. 3/11/2015 00:00 - 02:00 2.00 FISH P DECOMP PJSM.CONTINUE TO LAY DOWN BHA. -LAY DOWN DRILL COLLARS. -CLEAR/CLEAN RIG FLOOR. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 20 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 04:00 2.00 FISH P DECOMP PJSM.PICK UP BHA TO CUT 4 1/2"TUBING. -MAKE UP CUTTER,X/OS AND(8)STANDS, (24 JTS),2 7/8"HT PAC PIPE. -X/O BACK TO DRILL PIPE. 04:00 - 07:30 3.50 FISH P DECOMP 'PJSM.RIH W/TUBING CUTTER ASSEMBLY ON 4"DRILL PIPE. -LOSS RATE WHILE RUNNING IN THE HOLE= 1-2 BPH OF 9.8 PPG BRINE. -RIH TO 9450'.ACQUIRE UP AND DOWN WT, UP WT=192K,DOWN WT=129K. -ACQUIRE SLOW CIRCULATING RATES. 07:30 - 13:00 5.50 FISH P DECOMP SET DOWN HARD @ 9636',5K DOWN.CLEAN PICK UP. -UP WT=195K,DOWN WT=130K,ROTATING WT=160K,7K FT/LBS OF FREE SPIN TORQUE. NOTIFY TOWN AFTER ATTEMPTING SEVERAL TIMES.AGREE TO CONTINUE WORKING. -BRING ON PUMP @ 1/4 BBL/MIN @ 190 PSI AND SET DOWN AND GET THRU OK. -WORK ON DOWN 5-10 FT AT ATA TIME AND OBSERVE CLEAN PICKUPS. TAG UP AGAIN AT TOP OF 4 1/2"TUBING STUB WHERE CUT(S)WERE MADE @ 9663'. ATTEMPT TO WORK THRU USING VARIOUS TECHNIQUES.CONSULT TOWN. -UNABLE TO WORK THRU,(JUNK IN THE TOP OF THE TUBING CAUSING SOME OVERPULLS WHEN PULLING UP). -CONSULT TOWN AND AGREE TO POOH, STAND BACK DRILL PIPE AND TEST BOPE. 13:00 - 18:00 5.00 FISH P DECOMP POOH WITH TUBING CUTTER ASSEMBLY. -POOH FROM 9,661'MD TO 810'MD. -MONITOR WELL FOR(10)MINUTES.WELL STABLE.LOSS RATE=2.5 BPH. 18:00 - 20:30 2.50 FISH P DECOMP PJSM.L/D BAKER CUTTER BHA#12. -STAND BACK 2-7/8"PAC IN DERRICK. -L/D CUTTER BHA. -CUTTER BLADES WERE FLAT,AND BULLNOSE WARN.NO OTHER SIGNIFICANT WEAR. 20:30 - 21:30 1.00 BOPSUR P DECOMP PULL WEAR RING. -CLEAN AND CLEAR RIG FLOOR. -DRAIN OUT BOPE STACK. -FUNCTION TEST ALL RAMS. -P/U RUNNING TOOL,BOLDS AND PULL WEAR RING. 21:30 - 22:30 1.00 BOPSUR P DECOMP SET TEST PLUG. -R/U SECONDARY KILL AND CEMENT LINES FOR FILLING IA DURING BOPE TEST. -R/U BOPE TEST EQUIPMENT. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 21 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UW1:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 00:00 1.50 BOPSUR P DECOMP PJSM.TEST FOUR PREVENTER 13-5/8"BOPE AND RELATED EQUIPMENT. -TEST BOPE ACCORDING TO AOGCC REGULATIONS,DOYON AND BP PROCEDURES. -TEST ANNULAR WITH 2-7/8"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST UPPER 2-7/8"X 5"FIXED RAMS WITH 2-7/8",4"AND 4-1/2"TEST JOINT TO 250 PSI, 3,500 PSI HIGH FOR 5 CHARTED MINUTES. 1-FLUID LOSS PAST(24)HOURS=26 BBLS 9.8 PPG BRINE. OA=40 PSI. 3/12/2015 00:00 - 04:00 4.00 BOPSUR P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. CROWN-O-MATIC AND SPCC CHECKS GOOD. PJSM.TEST FOUR PREVENTER 13-5/8"BOPE AND RELATED EQUIPMENT. TEST LOWER 3-1/2"X 6"VARIABLE RAMS WITH 3-1/2"AND 5-1/2"TEST JOINT TO 250 PSI,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST BLIND RAMS,FLOOR VALVES,AND CHOKE MANIFOLD TO 250 PSI,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -PERFORM ACCUMULATOR DRAW DOWN TEST WITH WSL PRESENT. -MPL TEST ALL RAMS. -NO FAILURES. -JOHNNIE HILL WAIVED STATES RIGHT TO WITNESSED TEST. 04:00 - 06:00 2.00 BOPSUR P DECOMP PJSM.BLOW DOWN AND RIG DOWN TEST EQUIPMENT. -PULL TEST PLUG,SET WEAR RING. -7 1/4"ID.RILDS ON WEAR RING,3 3/4"IN,1" OF TRAVEL. -MAKE UP SAFETY JT. 06:00 - 08:00 2.00 CLEAN P DECOMP PJSM.PICK UP AND MAKE UP CLEANOUT BHA#13. -PICK UP(9)JTS 4 3/4"DRILL COLLARS. -3 3/4"CONVEX MILL AND 3 3/4"STRING MILL. -JARS,BUMPER SUB AND PUMP OUT SUB. 08:00 - 11:00 3.00 CLEAN P DECOMP PJSM.RIH W/CLEANOUT BHA#13 ON 4" HT-38 DRILL PIPE. -RIH F/591'-5200'.LOSING APPROXIMATELY 1/2-1 BPH W/RUNNING IN HOLE. 11:00 - 11:30 0.50 CLEAN P DECOMP KICK DRILL W/RIH. -SIMULATE AIR NOT WORKING ON REMOTE CHOKE PANEL. -UTILIZE MANUAL HYDRAULIC BACK UP SYSTEM TO OPERATE CHOKE. -GOOD AFTER ACTION REVIEW WITH CREW. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 22 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:OOAM Rig Release:3/27/2015 Rig Contractor DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:30 - 12:00 0.50 CLEAN P DECOMP CONTINUE TO RIH W/CLEAN OUT ASSEMBLY ON 4"DRILL PIPE. -RIH TO 6276'.UP WT=137K,DOWN WT= 110K. -LOSSES TO WELL LAST(12)HRS=5 BBLS OF 9.8 PPG BRINE. -O/A=10 PSI.NO PUMPING OPERATIONS THIS TOUR. 12:00 - 12:30 0.50 CLEAN P DECOMP SERVICE AND INSPECT RIG EQUIPMENT. -PERFROM SPCC CHECKS,CROWN 0 MATIC, OK. 12:30 - 14:30 2.00 CLEAN P DECOMP 1PJSM.CONTINUE TO RIH W/CLEAN OUT BHA ON 4 1/2"DRILL PIPE. -RIH TO 9400'.(93 STANDS). • 14:30 - 15:30 1.00 CLEAN P DECOMP PJSM.SLIP AND CUT DRILLING LINE. -INSPECT BRAKES,CHECK CROWN O MATIC. 15:30 - 19:30 4.00 CLEAN P DECOMP CONTINUE RIH WITH CLEANOUT BHA#13. -RIH FROM 9,400'MD TO 9,450'MD. ,-TAG FILL AT 9,450'MD,ATTEMPT TO CIRCULATE,MILL PLUGGED AND DID NOT COME FREE UNTIL PUMP PRESSURE=2,000 PSI. -ACQUIRE SLOW CIRCULATING RATES. -ROTATE AND WASH DOWN FROM 9,450'MD TO 9,457'MD,TAG TOP OF FISH.PUMP AT 3 BPM=670 PSI.PUW=196 KLBS,SOW=136 I KLBS,FREE TORQUE=8 FT-KLBS. ROTATE AND WASH DOWN FROM 9,457'MD TO 9,660'MD,HARD TAG.PUMP AT 3 BPM= 800 PSI.PUW=201 KLBS,SOW=135 KLBS. -ROTATE AND MILL DOWN FROM 9,660'MD TO 9,670'MD. -ROTATE AND WASH DOWN FROM 9,670'MD TO 9,696'MD.HARD TAG,SET DOWN 1-2 KLBS. -BACK REAM AND ROTATE DOWN FROM 9,696'MD TO 9,655'MD(3)TIMES. 19:30 - 21:00 1.50 CLEAN P DECOMP PUMP 40 BBL 9.8 PPG VISCOSIFIED BRINE AT 7 BPM=1,470 PSI UNTIL RETURNS ARE CLEAN OF SAND. 21:00 - 00:00 3.00 CLEAN P DECOMP CONTINUE TO BACK REAM AND ROTATE FROM 9,670'MD TO 9,680'MD. -PUMP AT 7 BPM=1,400 PSI. -LOST CIRCULATION AT 21:25 HRS.NOTIFY DAY WSL,ODE AND SUPERINTENDENT. -POOH FROM 9,670'MD TO 9,625'MD,ABOVE TROUBLE AREA OF 9,660'MD. -CLOSE ANNULAR AND BULLHEAD 40 BBLS 9.8 PPG 40 VIS BRINE.PUMP AT ICR 7 BPM= 1,250 PSI,FCR 7 BPM=1,420 PSI. -SHUT DOWN AND MONITOR WELL.LOSS RATE=62 BPH. -CIRCULATE THROUGH CHOKE A DRILL STRING VOLUME(105 BBLS)TO GET 20 BBL 9.8 PPG 120 VIS BRINE TO BIT.PUMP AT 2 BPM=420 PSI. -FLUID LOSS PAST(24)HOURS=241 BBLS 9.8 PPG BRINE. OA=40 PSI. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 23 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:OOAM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/13/2015 00:00 - 04:00 4.00 CLEAN P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. CONTINUE TO CIRCULATE THROUGH CHOKE A DRILL STRING VOLUME(105 BBLS)TO GET 20 BBL 9.8 PPG 120 VIS BRINE TO BIT.PUMP AT 2 BPM=420 PSI. -CLOSE ANNULAR AND BULLHEAD 20 BBLS 9.8 PPG 120 VIS BRINE.PUMP AT 7 BPM= 1,550 PSI. -CIRCULATE BOTTOMS UP THROUGH CHOKE AT 3 BPM=500 PSI. '-SHUT DOWN AND MONITOR WELL.LOSS RATE=32 BPH. -CIRCULATE 40 BBL 9.8 PPG 120 VIS PILL AND ALLOW FLUID TO CONTACT PERFORATIONS. -MONITOR WELL FOR 1 HOUR TO LET FLUID CONTACT PERFORATIONS,LOSS RATE=11 BPH. 04:00 - 10:00 6.00 CLEAN P DECOMP PJSM.PICK UP STAND,MAKE UP TOP DRIVE. ESTABLISH PARAMETERS:UP WT=198K, DOWN WT=137K,ROT WT=170K. -ALL WT CHECKS INCLUDE 40K TOP DRIVE WT. -@ 20 RPM,FREE SPIN TORQUE=7K.RIH F/ 9625. -SET DOWN @ 9660',PICK UP AND ATTEMPT TO ROTATE IN W/NO PUMPS. -SET DOWN 3K,PICK UP AND BRING ON PUMPS @ 3 BPM/600 PSI.WORK THRU. -STOP ROTATING AND CONTINUE IN HOLE TO 9738',SET DOWN 5K. -POOH TO TROUBLE AREA @ 9660'AND WORK THAT AREA REPEATEDLY. -ABLE TO SET DOWN AND ROTATE THRU, APPEARS TO BEA LIP THERE W/NO OTHER OBSTRUCTIONS. 10:00 - 11:00 1.00 CLEAN P DECOMP PJSM.BLOW DOWN AND BREAK OUT TOP DRIVE. -POOH TO 9400'W/NO OVER PULLS. -RIH W/NO ROTATION,ALL GOOD BUT TAGGED UP @ 9663'AND ROTATE PAST W/2K ON TUBING STUB. -RUN ON IN TO 9741'.(96 STANDS,1 SINGLE AND 22'). 11:00 - 12:00 1.00 CLEAN P DECOMP PJSM.POOH F/9741'-7824',NO OVER PULLS OR HANG UPS. -ACQUIRE SLOW CIRCULATING RATES AT 9,625'WITH 9.8 PPG VISCOSIFIED BRINE. -FLUID LOSS PAST(12)HOURS=249 BBLS 9.8 PPG BRINE. OA=380 PSI. 12:00 - 12:30 0.50 CLEAN P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 24 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:0O:OOAM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 17:00 4.50 CLEAN P DECOMP PJSM.CONTINUE TO POOH W/4"DRILL PIPE AND CLEAN OUT BHA. -POOH F/7884'-620'.MONITOR WELL F/10 MINUTES.LOSS RATE=7 BPH. 17:00 - 19:30 2.50 CLEAN P DECOMP POOH TO SURFACE WITH BAKER CLEANOUT BHA#13. -INSPECT CONVEX MILL WITH NO MAJOR 'WEAR NOTED,WILL RE-RUN. -CLEAN AND CLEAR RIG FLOOR. • 19:30 - 21:30 2.00 CLEAN P DECOMP PJSM.M/U AND RIH WITH BAKER CLEANOUT BHA#14. -RIH FROM SURFACE TO 1,063'MD. 21:30 - 00:00 2.50 CLEAN P DECOMP RIH WITH BAKER CLEANOUT BHA#14. -RIH FROM 1,063'MD TO 3,427'MD.PUW=86 KLBS,SOW=85 KLBS. -FLUID LOSS PAST(24)HOURS=337 BBLS 9.8 PPG BRINE. OA=0 PSI. 3/14/2015 00:00 - 00:30 0.50 CLEAN P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. CROWN-O-MATIC AND SPCC CHECKS GOOD. 00:30 - 05:30 5.00 CLEAN P DECOMP PJSM.RIH WITH BAKER CLEANOUT BHA#14. -RIH FROM 3,427'MD TO 9,450'MD.PUW= 198 KLBS,SOW=138 KLBS. -ROTATING WT=156K,35 RPM=8000 FT/LBS FREE SPIN TORQUE. -RIH FROM 9,450'MD TO 9,661'MD,HARD TAG.NO FILL OBSERVED WHILE GOING THROUGH TUBING STUB AT 9,457'MD. -ROTATE AND WASH DOWN FROM 9,661'MD. WASH DOWN©1BPM/350 PSI TO 10,035'BIT DEPTH. -ACQUIRE SLOW CIRCULATING RATES. 05:30 - 10:30 5.00 CLEAN P DECOMP PJSM.BREAK OFF AND BLOW DOWN TOP DRIVE. -POOH F/10,035'TO 9650'.RBIH TO 9663', SET DOWN 3K AND ROTATE INTO STUB,NO ISSUES. -CONTINUE TO POOH TO 1062'.MONITOR WELL/10 MINUTES,8 BPH LOSS RATE. 10:30 - 12:00 1.50 CLEAN P DECOMP PJSM.LAY DOWN BHA#14,(CLEAN OUT BHA),TO 759'. -FLUID LOSS PAST(12)HOURS=107 BBLS OF 9.8 PPG VISCOSIFIED BRINE. OA=20 PSI. 12:00 - 14:00 2.00 CLEAN P DECOMP PJSM.BREAK DOWN AND LAY DOWN BHA. -LAY DOWN 2 7/8"PAC PIPE AND BHA ASSEMBLY. 14:00 - 14:30 0.50 CLEAN P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. 14:30 - 17:00 2.50 CLEAN P DECOMP CLEAN AND CLEAR RIG FLOOR OF EQUIPMENT. -BRING HALLIBURTON RTTS INTO PIPE SHED. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 25 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:OOAM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 20:00 3.00 DHB P DECOMP PJSM.M/U AND RIH WITH 7"HES RTTS. -RIH FROM SURFACE TO 6,450'MD.PUW= 132 KLBS,SOW=108 KLBS. -ACQUIRE SLOW CIRCULATING RATES. 20:00 - 00:00 4.00 DHB P DECOMP SET 7"HES RTTS AND PERFORM MIT-IA. -SET RTTS AS PER HES REPRESENTATIVE AT 6,450'MD.SET DOWN 21 KLBS TO VERIFY SET. ATTEMPT TO PRESSURE TEST RTTS. PRESSURE UP TO 250 PSI,WOULD NOT HOLD.BRING UP PRESSURE TO 750 PSI, BLED OFF TO 300 PSI IN 5 MINUTES. -CONTACT ODE,DECISION MADE TO RELEASE RTTS AND MOVE UP HOLE. -RELEASE RTTS AND POOH TO 6,386'MD. -SET RTTS AS PER HES REPRESENTATIVE AT 6,386'MD.SET DOWN 20 KLBS TO VERIFY SET. -ATTEMPT TO PRESSURE TEST RTTS. PRESSURE UP TO 250 PSI,GOOD TEST. BRING UP PRESSURE TO 1,150 PSI,BLED OFF TO 700 PSI IN 5 MINUTES. CONTACT ODE,DECISION MADE TO RELEASE RTTS AND MOVE UP HOLE. RELEASE RTTS AND POOH TO 6,197'MD. -SET RTTS AS PER HES REPRESENTATIVE AT 6,197'MD.SET DOWN 20 KLBS TO VERIFY SET. -ATTEMPT TO PRESSURE TEST RTTS. PRESSURE UP TO 300 PSI,WOULD NOT HOLD. -CONTACT ODE,DECISION MADE TO RELEASE RTTS AND MOVE UP HOLE. -FLUID LOSS PAST(24)HOURS=184 BBLS OF 9.8 PPG VISCOSIFIED BRINE. OA=0PSI. 3/15/2015 00:00 - 00:30 0.50 DHB P DECOMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. 00:30 - 02:00 1.50 DHB P DECOMP PJSM.SET 7"HES RTTS AND PERFORM MIT-IA. -RELEASE RTTS AND POOH TO 5,912'MD. -SET RTTS AS PER HES REPRESENTATIVE AT 5,912'MD.SET DOWN 23 KLBS TO VERIFY SET. -PRESSURE TEST RTTS TO 250 PSI LOW FOR(5)MINUTES,3,500 PSI HIGH FOR(30) MINUTES.PASSES BP TESTING CRITERIA. -LOST 60 PSI IN THE FIRST 15 MINUTES, LOST 10 PSI IN THE SECOND 15 MINUTES. -CONTACT WTL KEN SCHNEIDER FOR APPROVAL TO PROCEED. -MONITOR WELL FOR(10)MINUTES.WELL STABLE.LOSS RATE=7 BPH. 02:00 - 06:30 4.50 DHB P DECOMP POOH WITH 7"HES RTTS. -RELEASE RTTS AND POOH FROM 5,912'MD TO SURFACE. -L/D HES RTTS AND RUNNING TOOL. Printed 4/6/2015 9:59:39AM North America-ALASKA BP Page 26 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project.Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:OOAM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:30 - 09:00 2.50 DHB P DECOMP PJSM.R/U TO RUN LOWER SCAB LINER. -CLEAR AND CLEAN RIG FLOOR. -BREAK DOWN TOOLS AND RIG UP TO RUN LOWER SCAB LINER. -RIG UP TORQUE TURN AND ASSOCIATED EQUIPMENT. 09:00 - 11:30 2.50 CASREP P INTERV PJSM.M/U AND RIH WITH LOWER SCAB LINER. M/U MULE SHOE,(8)JOINTS 3-1/2"TUBING, X-O'S TO 5-1/2",(3)JOINTS 5-1/2"TUBING, ZXPN LINER TOP PACKER. -RIH TO 452'MD.PUW=44 KLBS,SOW=47 KLBS. -R/D 5-51/2"POWER TONGS. 11:30 - 12:00 0.50 CASREP P INTERV PJSM.RIH WITH LOWER SCAB LINER ON 4" 1 DRILL PIPE. 1-RIH FROM 452'MD TO 549'MD. '-FLUID LOSS PAST(12)HOURS=88 BBLS OF 9.8 PPG VISCOSIFIED BRINE. OA=20 PSI. NO SLOW CIRCULATING RATES THIS TOUR. 12:00 - 13:00 1.00 CASREP r P INTERV PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS GOOD. R/D CASING EQUIPMENT. 13:00 - 21:30 8.50 CASREP P INTERV PJSM.RIH WITH LOWER SCAB LINER ON 4" DRILL PIPE. -RIH FROM 549'MD TO 9,663'MD,HARD TAG. DID NOT SEE TOP OF FISH-9,457'MD. -M/U TO TOP DRIVE AND PUT(2)TURNS TO THE RIGHT.WORK PIPE DOWN PAST TROUBLE SPOT AT 9,663'MD. -RIH FROM 9,663'MD TO 9,736'MD,NO-GO. PUW=192 KLBS,SOW=134 KLBS. -SET DOWN 20 KLBS,P/U AND SET DOWN AGAIN 20 KLBS TO VERIFY. -ACQUIRE SLOW CIRCULATING RATES. 21:30 - 23:30 2.00 CASREP P INTERV BREAK OUT TOP DRIVE AND DROP BALL. -M/U TOP DRIVE AND PUMP BALL DOWN. -PUMP AT 4 BPM=970 PSI,AFTER 76 BBLS PUMPED,PRESSURED UP TO 3,820 PSI. HOLD FOR(5)MINUTES. -HRD-E LINER RUNNING TOOL DID NOT RELEASE. -SET DOWN 45 KLBS AND PRESSURE UP TO 4,000 PSI,BALL SEAT SHEARED.RELEASED HRD-E LINER RUNNING TOOL AT THE SAME TIME. -P/U TO EXPOSE PACKER SETTING DOGS. PUW=190 KLBS,SOW=135 KLBS. -P/U AND ROTATE AT 15 RPM,SET DOWN 25 KLBS TO PACKER SET.GOOD INDICATION ON SURFACE OF PACKER SETTING. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 27 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 CASREP P INTERV PJSM.POOH WITH BAKER LINER RUNNING TOOL. -BLOW DOWN TOP DRIVE. POOH FROM 9,328'MD TO 9,135'MD. FLUID LOSS PAST(24)HOURS=228 BBLS OF 9.8 PPG VISCOSIFIED BRINE. OA=10 PSI. 3/16/2015 00:00 - 00:30 0.50 CASREP P INTERV PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS 'GOOD. 00:30 - 06:00 5.50 CASREP P INTERV PJSM.POOH WITH BAKER LINER RUNNING TOOL. -POOH FROM 9,135'MD.LAY DOWN RUNNING TOOL. -CLEAR AND CLEAN RIG FLOOR. 06:00 - 07:30 1.50 CASREP P INTERV MOBILIZE HES 5 1/2"RETRIEVABLE BRIDGE PLUG. -RIG UP POWER TONGS. 07:30 - 09:00 1.50 CASREP P INTERV PJSM.MAKE UP HALLIBURTON 5 1/2"RBP. RIH ON 2 7/8"PAC HT DRILL PIPE,(6 JTS). 09:00 - 12:00 3.00 CASREP P INTERV PJSM.RIH W/5 1/2"RBP ASSEMBLY ON 4"HT 38 DRILL PIPE. -LOSSES TO WELL BORE LAST(12)HRS 31 BBLS 9.8 PPG VISCOSIFIED BRINE. O/A=OPSI @06:00 HRS. 12:00 - 12:30 0.50 CASREP P INTERV SERVICE AND INSPECT RIG EQUIPMENT. -PERFORM SPCC CHECKS,CROWN 0 MATIC OK. 12:30 - 16:30 4.00 CASREP P INTERV PJSM.CONTINUE TO RIH W/RBP ON 4"DRILL PIPE. UP WT=190K,DOWN WT-135K,ALL WT CHECKS INCLUDE 40K TOP DRIVE. -PICK UP SINGLES F/9295'-9447',LIGHT TAG,DEPTH CONTROL. -PICK UP 20',ROTATED 2 TURNS TO THE LEFT WHILE PICKING UP. -SET RBP AT 9427'MD.SET DOWN 15K& OVERPULL TO 210K TO VERIFY AND RELEASE FROM RBP. 16:30 - 18:30 2.00 CASREP P INTERV P/U TO 9,422'MD AND DISPLACE WELL WITH 9.8 PPG BRINE. PUMP AT 4 BPM=690 PSI,PUMP 160 BBLS. 18:30 - 21:00 2.50 CASREP P INTERV PJSM.DUMP 20/45 SAND ON TOP OF RBP. -BREAK DOWN AND BLOW DOWN TOP DRIVE. -POOH TO 9,355'MD AND MAKE UP SAND HOPPER ON DRILL PIPE. -DUMP(15)50 LBS SACKS OF SAND. -PUMP 15 BBLS AFTER EVERY(5)SACKS AT 1 BPM=190 PSI. 21:00 - 00:00 3.00 CASREP P INTERV CONTINUE TO DISPLACE WELL WITH 9.8 PPG BRINE. -PUMP AT 1 BPM=190 PSI. -WAIT 1 HOUR FOR SAND TO DROP. -SLIP AND CUT 81'OF DRILLING LINE. -FLUID LOSS PAST(24)HOURS=228 BBLS OF 9.8 PPG VISCOSIFIED BRINE. OA=10 PSI. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 28 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/17/2015 00:00 - 01:00 1.00 RIGU P OTHCMP CONTINUE TO SLIP AND CUT DRILLING LINE. -INSPECT BRAKE LINKAGE,CHECK CROWN O MATIC. 01:00 - 01:30 0.50 CLEAN P OTHCMP PJSM.RIH AND TAG TOP OF SAND @ 9371'. SET DOWN 5K. 01:30 - 03:00 1.50 CLEAN P OTHCMP PJSM.POOH F/9371'-9264'.MAKE UP TOP DRIVE. -CIRCULATE OUT 9.8 VISCOSIFIED BRINE REMAINING IN WELL,(30 BBLS). 3 BPM/220 PSI.CLEAN UNVISCOSIFIED BRINE RETURNS.BREAK OFF AND BLOW DOWN TOP DRIVE. 03:00 - 09:00 6.00 CLEAN P OTHCMP PJSM.POOH AND LAY DOWN 4"DRILL PIPE. -SLOW PUMP RATES ACQUIRED:MP#1=3 BPM/220 PSI&4 BPM/360 PSI. -LDDP F/9264'-6105'.POOH AND STAND BACK DP TO BHA. -STAND BACK 2 7/8"DRILL PIPE,LAY DOWN RBP RUNNING TOOL. -MUD PUMP#2=3 BPM/220 PSI&4 BPM/ 360 PSI. 0/A=0 PSI©06:00 HRS. 09:00 - 11:00 2.00 RIGU P OTHCMP CLEAR/CLEAN RIG FLOOR.RIG UP 5 1/2" POWER TONGS. -MAKE UP 5 1/2"TCII FOSV. 11:00 12.00 1.00 DHB P OTHCMP PJSM W/ALL PARTIES INVOLVED.RUN UPPER SCAB LINER. -BAKER LOCK ALL CONNECTIONS IN SHOE TRACK ASSEMBLY. -TORQUE TURNING ALL 5 1/2"TCII CONNECTIONS T/5500FT/LBS -USING JET LUBE SEAL GUARD ON ALL CONNECTIONS ABOVE SHOE TRACK -LOSSES TO WELL=15 BBL OF 9.8 PPG BRINE LAST(12)HOURS. 12:00 - 19:30 7.50 DHB P OTHCMP CONTINUE P/U 5-1/2"17#L-80 TC-II LNR F/ SHED -RIH F/58'MD T/3390'MD -POW=90KLBS,SOW=86KLBS -BAKER LOCK ALL CONNECTIONS IN SHOE TRACK ASSEMBLY. TORQUE TURNING ALL 5 1/2"TCII CONNECTIONS T/5500FT/LBS -USING JET LUBE SEAL GUARD ON ALL CONNECTIONS ABOVE SHOE TRACK -FILL PIPE EVERY 5 JNTS 19:30 - 20:30 1.00 DHB P OTHCMP C/O PIPE HANDLING EQUIPMENT F/5-1/2"17# L-80 TC-II LNR T/4"DP AND M/U BAKER LNR HANGER/LTP -M/U LNR WIPER PLUG ON THE BOTTOM OF RUNNING TOOL(VERIFY SERIAL#,ID's AND OD's)' -ATTEMPT T/RUN WIPER DART INTO 5-1/2" LNR.(NO-GO) Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 29 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 21:30 1.00 DHB N WAIT OTHCMP ATTEMPT T/STAB LNR WIPER PLUG INTO 5-1/2"LNR(NO-GO) -WIPER PLUG NOSE STACKING OUT ON PIN END SEALING SHOULDER OF TCII CONNECTION(MARKS ON PLUG NOSE INDICATIVE TO NO-GO LOCATION) -BOT ASKED TO BRING ANOTHER WIPER PLUG ANDA GUARD TO FUNNEL THE WIPER PLUG PAST THE NO-GO SHOULDER. 21:30 - 22:30 1.00 DHB N WAIT OTHCMP M/U NEW LNR WIPER PLUG AND STAB INTO 5-1/2"LNR -PLUG INITIALLY NO-GOED ON THE TC-II SEALING SHOULDER,BUT WAS ABLE TO ENTER WHEN UTILIZING THE GUARD TO 'COVER THE NO-GO LOCATION.-RIH WITH BOT HMC LNR HANGER/HRD-E ZXPN LTP TO TOP OF LNR RUNNING TOOL. -DUMP 2.5 GALS OF PAL MIX INSIDE TOP OF RUNNING TOOL(ALLOW TO SET UP F/ -3OMIN). M/U BUMPER SUB WHILE WAITING ON PAL MIX TO GEL AND RIG DOWN CSG RUNNING TOOLS. 22:30 - 00:00 1.50 DHB P OTHCMP •CROSS OVER TO 4"DP AND CONTINUE T/RIH F/3443'MD T/4389'MD ON DP STANDS OUT OF THE DERRICK. LOSSES TO WELL=6BBLS OF 9.8 PPG BRINE LAST(12)HOURS. OA PRESSURE=30 PSI 3/18/2015 00:00 - 00:30 0.50 DHB P OTHCMP PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATIC AND SPCC CHECKS (GOOD). 00:30 - 05:00 4.50 DHB P OTHCMP CONTINUE T/RIH ON 4"DP F/4389'MD T/ 9291'MD -FILL PIPE EVERY 5 STANDS -ESTABLISH PARAMETERS:196K UP WT, 138K DOWN WT.ALL WT CHECKS INCLUDE 40K TOP DRIVE. -TAG @ 9291'W/5K DOWN,LAY DOWN(2) JTSAND PICKUP 15'DRILL PIPE PUP AND MAKE UP(1)FULL JT. -RIH,TAG @ 9291'AND SET DOWN 20K. -AOGCC GIVEN 24HR NOTIFICATION OF BOPE TEST @ 04:OOAM 3/18/2015 05:00 - 07:00 2.00 DHB P OTHCMP PJSM.RIG UP BAKER CEMENTIING HEAD. MAKE UP TOP DRIVE. -MAKE UP CEMENTING LINE.ESTABLIHS CIRCULATING PARAMETERS. -1 BPM @ 130 PSI,2 BPM @ 270 PSI,3 BPM @ 530 PSI @ 4 BPM @ 780 PSI,FULL RETURNS.. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 30 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UW:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 10:00 3.00 DHB P OTHCMP PJSM W/SCHLUMBERGER/BAKER/AND ALL HANDS ASSOCIATED WITH THE CEMENTING OPERATION. -REVIEW PRESSURE CROSS CHECK LIST AND IDENTIFY JOB TASKS AND TASK LEADERS. BLOWAIR THROUGH LINES.PUMP 10 BBLS WATER TO HEAT LINES AND PRESSURE TEST CEMENT LINES. PRESSURE TEST @ 250/4250 PSI,5 MIN EACH/CHARTED. -CHECK TRIPS.CEMENT PUMP TRIPS SET FOR 4250 PSI.MECHANICAL PRV SET @ 5000 PSI. -BATCH MIX CEMENT TO 15.3 PPG AS PRESCRIBED BY PROGRAM. - OTHCMP :1PUMP(5)BBLS FRESH WATER AHEAD AND 10:00 12:00 2.00 DHB P I PUMP 42 BBLS 15.3 PPG CLASS G CEMENT. -FCP @ 4 BPM/700 PSI.W/42 BBLS CEMENT AWAY,SHUT DOWN AND DROP DART. -CONFIRM DART AWAY,PUMP(5)BBLS FRESH WATER AND FOLLOW W/9.8 PPG BRINE. •-DISPLACE W/SCHLUMBER @ 4-5 BPM/325 425 PSI.SLOW PUMPS TO LATCH DART. -OBSERVE DART LATCH W/900 PSI, CONTINUE DISPLACING W/9.8 PPG BRINE. -SLOW PUMPS TO 2 BPM @ 132 BBLS DISPLACED.OBSERVE PLUG BUMP AND CORRESPONDING PRESSURE INCREASE. -PLUG BUMPED W/139 BBLS AWAY. INCREASE PRESSURE TO 4325 PSI.SLACK OFF ON DRILL STRING SETTING DOWN TOTAL OF 50K. LINER HANGER SET,PICK UP AND OBSERVE NEW UP WT OF 125K,LINER RUNNING TOOL RELEASED. -CEMENT IN PLACE @ 11:00 HRS.BLEED PRESSURE AND CHECK FLOATS.1 1/2 BBLS BACK,FLOATS HOLDING. -PICK UP AND EXPOSE PACKER SETTING DOGS.SLACK OFF 30K W/RIGHT HAND ;ROTATION T SET ZXP LINER TOP PACKER. -PRESSURE UP TO 900 PSI AND PICK UP UNTIL PRESSRE DROPS AND RETURNS ARE OBSERVED. -CIRCULATE @ 10-12 BPM/1350 PSI,150 BBLS,OBSERVED APPROXIMATELY(5)BBLS CEMENT BACK @ 125 BBLS PUMPED. -CIRCULATE UNTIL CLEAN 9.8 PPG BRINE RETURNS.SHUT DOWN,MONITOR WELL, WELL STABLE. 12:00 - 13:30 1.50 DHB P OTHCMP PJSM.BREAK OUT AND LAY DOWN CEMENTING HEAD. LAY DOWN 15 DRILL PIPE PUP JT AND BLOW DOWN AND RIG DOWN CEMENTERS. 13:30 - 16:30 3.00 DHB P OTHCMP POOH F/5875'MD T/230'MD W/LNR RUNNING TOOL -MONITOR WELL,(FLUID LEVEL STABLE) 16:30 - 18:00 1.50 DHB P OTHCMP SERVICE BREAK RUNNING TOOLS,P/U CEMENT HEAD AND SERVICE BREAK AS WELL. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 31 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UW1:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 19:00 1.00 WHSUR P OTHCMP DRAIN STACK,P/U WEAR RING PULLING TOOL AND PULL WEAR RING. 19:00 - 21:30 2.50 WHSUR P OTHCMP M/U PACK OFF PULLING TOOL,BOLDS,PULL PACK OFF,INSTALL NEW PACK OFF,RILDS -11KLBS OVER BLOCK WEIGHT TO RELEASE PACK OFF -L/D RUNNING TOOL 21:30 - 22:30 1.00 WHSUR P OTHCMP PPPOT-IC -250PSI LOW/3500PSI HIGH,F/30MINS (PASSING TEST) 22:30 - 00:00 1.50 BOPSUR P OTHCMP INSTALL TEST PLUG,R/U TEST EQUIPMENT, BEGIN TESTING BOPE ALL TESTS 250PSI/LOW,3500PSI/HIGH,F/5 CHARTED MINS -AOGCC REP JEFF JONES WAIVED WITNESS TO TEST @ 5:30PM 3/18/2015 OA PRESSURE=OPSI LOSSES TO THE WELL=OBBLS(NOON- .MIDNIGHT) 3/19/2015 00:00 - 05:00 5.00 CASREP P INTERV PJSM,CONTINUE TESTING BOPE -TEST BOPE W/2-7/8",3-1/2",AND 4-1/2"TEST JOINTS -ALL TESTS T/250PSI LOW,3500PSI HIGH F/ 5 CHARTED MINS -KOOMEY TEST WITNESSED BY WSL.NO FAILURES. • 05:00 - 06:00 1.00 CASREP P INTERV CLEAN AND CLEAR RIG FLOOR F/BOPE TESTING. -BLOW DOWN SURFACE LINES.DRAIN MUD/ GAS SEPARATOR.PULL TEST PLUG. -INSTALL 7 1/4"WEAR BUSHING. 06:00 - 08:30 2.50 CASREP P INTERV PJSM.RIG UP POWER TONGS.PICK UP AND MAKE UP SHOE TRACK MILLING BHA. -4 3/4"MILL TOOTH BIT AND 4 3/4"STRING MILL ON 2 7/8"PAC HT PIPE. 08:30 - 12:00 3.50 CASREP P INTERV PJSM.RIH W/SHOE TRACK MILLING BHA. -RUN(12)STANDS OF 2 7/8"DRILL PIPE FROM THE DERRICK. -PICK UP 2 7/8"DRILL PIPE FROM THE PIPE SHED..RIH TO 2994'. -LOSSES TO WELL LAST(12)HOURS=0 BELS. -O/A=O PSI @06:00 HRS. 12:00 - 12:30 0.50 CASREP P INTERV SERVICE RIG AND CHECK OUT ALL EQUIPMENT BEING USED IN CURRENT OPERATION. PERFORM SPCC CHECKS,CROWN 0 MATIC, OK. 12:30 - 16:30 4.00 CASREP P INTERV PJSM.CONTINUE TO RIH W/SHOE TRACK MILLING BHA ON 2 7/8"PAC HT DRILL PIPE. -RIH F/2994-3677'.MAKE UP X/O AND RUN (9)4 3/4"DRILL COLLARS. -CONTINUE IN HOLE ON 4"DRILL PIPE TO TOP OF LINER @ 5875'. 16:30 - 20:00 3.50 CASREP P INTERV TAKE DRILLING PARAMETERS AND CONTINUE TO TRIP INTO THE SCAB LNR T/ 7460'MD -@ 20 RPM FREE TQ=2K,ROT WT= 110KLBS -POW=111K,SOW=104K @ 5875'MD Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 32 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 'X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 22:00 2.00 CASREP P INTERV R/U TEST EQUIPMENT AND PERFORM MIT ON 7"CSG W/5-1/2"SCAB LNR. -250PSI LOW F/5 CHARTED MINS,3500PSI HIGH F/30 CHARTED MINS. -38 STKS T/PRESSURE UP WELLBORE, BLEED BACK 3.3BBLS(NO LOSSES). -LOST 30PSI IN 1ST 15MINS,AND 10PSI IN THE 2ND 15MINS(GOOD TEST) -MONITOR WELL. -CONTACT RWO WTL FOR MIT APPROVAL, (APPROVAL GRANTED) 22:00 - 00:00 2.00 CASREP P INTERV CONTINUE T/RIH F/7460'MD T/8981'MD. -WASH DOWN F/8981'MD T/9051'MD @ 4BPM 1340PSI -POW=165KLBS,SOW=135KLBS OA PRESSURE=200PSI LOSSES TO WELL LAST(12)HOURS=OBBLS 9.8PPG BRINE IN AND OUT. 3/20/2015 00:00 - 02:00 2.00 DI-IB P OTHCMP WASH DOWN F/9051'MD T/LANDING COLLAR @ 9253'MD(TAG COLLAR) -4BPM=134OPSI 02:00 - 11:00 9.00 DHB P OTHCMP DRILL OUT SHOE TRACK: UP WT=170K,DOWN WT=132K& ROTATING WT=150K,ALL WT CHECKS INCLUDE 40K TOP DRIVE. -DRILLING ON LANDING COLLAR @40RPM, 7K TQ,3BPM,2K WT ON BIT.(FREE TQ=5K @ 40RPM) -PUMPING @ 2/3/&4 BPM,400/780&1400 PSI RESPECTIVELY. -DRILL ON LANDING COLLAR F/9254'-9259'. (ADD 1 BBL OF STEEL LUBE TO SYSTEM FOR TORQUE CONTROL. 11:00 14:30 3.50 DHB P OTHCMP CONTINUE TO DRILL CEMENT ON DOWN TO FLOAT COLLAR @ 9273'. -MILL ON THRU FLOAT COLLAR.70 RPM/1- 5K WOB,4 BPM @ 1360 PSI.5-6000 FT/LBS OF TORQUE WHILE MILLING. -MILL TO 9360'. -LOSSES TO WELL BORE LAST 14 1/2 HRS= 0 BBLS. 0/A PRESSURE AT MIDNITE=0 PSI. 14:30 - 16:00 1.50 DHB P OTHCMP PJSM.CIRCULATE 20 BBLS HI VIS SWEEP SURFACE TO SURFACE. -CIRCULATE @ 5 BPM/1700 PSI.SWEEP BACK,SOME CEMENT BUT NOT TOO MUCH IN THE WAY OF DEBRIS. CIRCULATE TILL CLEAN BRINE RETURNS. 16:00 - 20:30 4.50 DHB P OTHCMP POOH F/9371'MD T/3959'MD -MONITOR WELL F/10MINS(STATIC) RACK BACK 4-3/4"DRILL COLLARS 20:30 - 23:30 3.00 DHB P OTHCMP CROSS OVER T/2-7/8"HANDELING EQUIPMENT AND CONTINUE T/POOH T/ SURFACE 23:30 - 00:00 0.50 DHB P OTHCMP BREAK DOWN BAKER FISHING DRILLOUT BHA#15 LOSSES TO THE WELLAT MIDNIGHT=OBBLS. OA PRESSURE=50PSI. 9.8PPG BRINE,IN AND OUT. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 33 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/21/2015 00:00 - 01:00 1.00 DHB P OTHCMP PJSM,CONTINUE BREAKING DOWN BAKER CLEANOUT BHA#15 01:00 - 02:00 1.00 RIGU P OTHCMP CLEAN RIG FLOOR&TOOLS DUE TO BRINE. 02:00 - 02:30 0.50 DHB P OTHCMP ''i PJSM,M/U BAKER CLEANOUT BHA#16 RCJB RUN. 02:30 - 09:30 7.00 DHB P OTHCMP RIH W/BAKER FISHING BHA#16 ON 2-7/8" PAC HT DRILL PIPE F/SURFACE T/3658'MD M/U JUNK SUBS,,BUMPER SUB AND JARS. RIH TO 5733,CLOSE TO TOP OF LINER. -DROP BALL FOR RCJB.P/U WT=113K, DOWN WT=106K,ROTATING WT=108K @ 20 RPM. -PUMP BALL ON SEAT,3 BPM @ 1190 PSI WI BALL ON SEAT.BLOW DOWN TOP DRIVE. -CONTINUE TO RIH TO 9310'.UP WT=164K, DOWN WT=139K,ROTATING WT @ 20 RPM= 154K. -3000 FT/LBS FREESPIN TORQE.ACQUIRE SLOW PUMP RATES. -MUD PUMP 1 =20 SPM @ 660 PSI&30 SPM @ 1400 PSI. -MUD PUMP 2=20 SPM @ 800 PSI&30 SPM @ 1840 PSI. BREAK CIRCULATION @ 3.6 BPM/2400 PSI. 09:30 - 10:30 1.00 DHB P OTHCMP PJSM.ROTATE @ 20 RPM W/3000 FT/LBS FREE SPIN TORQUE. -SLACK OFF TO TOP OF SAND @ 9370'.MAKE 6"W/PUMPS OFF,TORQUE=4000 FT/LBS. -PICK UP AND ATTEMPT TO CIRCULATE,PSI CLIMBED TO 3000 PSI,SHUT DOWN PUMP. -BLEED OFF,DISCUSS OPTIONS,WORK PIPE UP AND DOWN W/BLEEDER OPEN, UNABLE TO UNPLUG. -PICK UP,CLOSE PIPE RAMS,LINE UP AND REVERSE CIRCULATE 6 BBLS @ 3 1/2 BPM/ 1700 PSI,FULL RETURNS. -LINE UP AND CIRCULATE DOWN DRILL PIPE, BALL GOES BACK ON SEAT AND STILL PLUGGED AT JETS IN RCJB. -INFORM SUPERINTENDANT AND ODE OF PLAN TO ROTATE DOWN INTO SAND TOP TO CAPTURE JUNK. -TAG SAND TOP AND DRY DRILL APPROXIMATELY 2-3'W/20 RPM,3-4000 FT/LBS OF TORQUE,3-4K WOB. -PICK UP AND DROP DART TO OPEN PUMP OUT SUB. 10:30 - 11:30 1.00 DHB P OTHCMP PJSM.BLOW DOWN CHOKE LINE AND SECONDARY KILL LINE. -LINE UP AND PUMP DOWN DRILL PIPE, SHEAR OUT PUMP OUT SUB W/2700 PSI. -ACQUIRE NEW SLOW PUMP RATES.MP1= 30 SPM/130 PSI&40 SPM/250 PSI. -MP2=30 SPM/200 PSI&40 SPM/370 PSI. BLEED OFF ALL PRESSURE.BLOW DOWN TOP DRIVE. 11:30 - 12:00 0.50 DHB P OTHCMP PJSM.POOH F/9279'-8332'.UP WT=150K, DOWN WT=130K. -LOSSES TO WELL BORE LAST(12)HRS=0 BBLS.0/A=0 PSI. Printed 4/6/2015 9:59:39AM .............. North America-ALASKA-BP Page 34 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 12:30 0.50 DHB P OTHCMP SERVICE AND INSPECT RIG EQUIPMENT. -PERFORM SPCC CHECKS AND CROWN 0 MATIC,OK. 12:30 - 14:30 2.00 DHB P OTHCMP PJSM.CONTINUE TO POOH F/8332'-3973'. MONITOR WELL(10)MINUTES,WELL STATIC. -STAND BACK 4 3/4"DRILL COLLARS. 14:30 - 15:00 0.50 DHB P OTHCMP 1 PJSM.CHANGE OUT HANDLING EQUIPMENT, PREP FLOOR VALVE AND C/O STRIPPING RUBBER. -NO DEBRIS FOUND IN BOOT BASKETS CONTINUE TO POOH W/2 7/8"PAC HT DRILL PIPE. 15:00 - 17:30 2.50 DHB P OTHCMP CONTINUE TO POOH W/2 7/8"PAC HT DRILL PIPE RACKING BACK IN THE DERRICK F/ '3973'MD T/BHA 17:30 - 19:00 1.50 DHB P OTHCMP BREAK DOWN RCJB -PACKED OFF W/SAND -CHIP SAND OUT OF RCJB,CLEAR RCJB FOR RUN#2 -ABOUT 1 GALLON OF SAND RECOVERED, MINOR ALUMINUM DEBRIS FOUND IN THE SAND CLEAN AND CLEAR RIG FLOOR 19:00 - 21:30 2.50 DHB P OTHCMP RIH W/BAKER FISHING BHA#17 ON 2-7/8"HT PAC DP F/DERRICK F/SURFACE T/3973'MD 21:30 - 00:00 2.50 DHB P OTHCMP CHANGE PIPE T/4"DP F/DERRICK AND CONTINUE IN THE HOLE F/3973'MD T/ 8237'MD -PUW=147KLBS,SOW=125KLBS OA PRESSURE=15PSI OBBL LOSSES FOR THE TOUR '9.8PPG BRINE IN AND OUT 3/22/2015 00:00 - 00:30 0.50 RIGU P OTHCMP !PTSM.SPCC AND EQUIPMENT CHECKS AROUND THE RIG. -CROWN-O-MATICAND SPCC CHECKS (GOOD). 00:30 - 01:30 1.00 DHB P OTHCMP CONTINUE RIH F/8237'MD-9310'MD -PUW=165K,SOW=137K 01:30 - 04:30 3.00 RIGU N RREP OTHCMP CHANGE OUT SAVER SUB,FIX PNUEMATIC CLUTCH ON TOP DRIVE 04:30 - 05:30 1.00 DHB P OTHCMP PJSM.POOH(1)STAND AND C/O TOP SINGLE ON STD#57. -BREAK CIRCULATION THRU RCJB W/BALL ON SEAT. -ACQUIRE SLOW PUMP RATES.MP1=20 SPM/520 PSI&30 SPM/1060 PSI. -MP2=20 SPM/640 PSI&30 SPM/1060 PSI. UP WT=165K,DOWN WT-137K,ROT WT= 150K @ 30 RPM. -ALL WT CHECKS INCLUDE 40K TOP DRIVE. 3000 FT/LBS FREE SPIN TORQUE. -WASH DOWN ON SAND F/TOP OF SAND @ 9370'-9388',WOB=2-3K W/WASHING DOWN. -ROTATING @ 30 RPM WHILE WASHING DOWN.3000 FT/LBS TORQUE. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 35 of 40 Operation Summary Report .... ........._-._. . Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Tme:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. U1M:500292288600 Active datum:P2-10 Updated©50.13usft(above Mean Sea Level) Date From-To I Hrs Task I Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 06:00 0.50 DHB P OTHCMP PJSM.POOH TO 9279'.DROP DART. -SHEAR OPEN PUMP OUT SUB,3000 PSI TO SHEAR. -ACQUIRE SLOW PUMP RATES:MP 1=30 SPM/100 PSI&40 SPM/180 PSI. -MP 2=30 SPM/ 160 PSI&40 SPM/290 PSI. 06:00 - 09:00 3.00 DHB P OTHCMP !PJSM.BLOW DOWN TOP DRIVE. -POOH F/9279'-4005'.MONITOR WELL 10 MIN/WELL STABLE. 09:00 - 10:00 1.00 DHB P OTHCMP B/D UPPER PORTION OF BHA -B/D AND L/D LBS,JARS,BOOT BASKETS, AND X-OVER. -CLEAR FLOOR AND C/O T/2-7/8"HANDLING EQUIP F/4"DP HANDLING EQUIP. -MM X-OVER F/FOSV. 10:00 - 11:30 1.50 DHB P 1 OTHCMP CONTINUE POOH ON 2-7/8"PAC HT DP F/ 3703'MD T/SURFACE. _ -RACKING BACK 2-7/8"DP IN THE DERRICK 11:30 - 12:00 0.50 DHB I P OTHCMP I BREAK DOWN BAKER FISHING BHA#17 CLEAN AND CLEAR RCJB(VERY LITTLE DEBRIS) OA PRESSURE=OPSI LOSSES AT NOON=OBBLS 9.8PPG BRINE IN AND OUT 12.00 - 13:00 1.00 -CASREP P INTERV SERVICE AND INSPECT RIG EQUIPMENT. -PERFORM SPCC CHECKS AND CROWN 0 MATIC,OK -CLEAN AND CLEAR BOTS F/RIG FLOOR -PJSM F/RIH W/RBP RETRIEVAL TOOL BHA #18 13:00 - 18:00 3.00 CASREP P INTERV ,P/U HALLIBURTON RBP RETRIEVAL BHA#18, RIH W/2-7/8"PAC HT DP&4-3/4"DC'S T/ 4063'MD -PUW=105KLBS,SOW=90KLBS 16:00 - 20:00 4.00 CASREP P INTERV X-OVER T/4"DP HANDELING EQUIP, CONTINUE IN HOLE ON 4"DP T/9255'MD -PUW=165KLBS,SOW=135KLBS. '-D1 KICK WHILE TRIPPING DRILL,W/AAR. 20:00 - 22:00 2.00 CASREP P INTERV SLIP AND CUT 67'MD OF DRILL LINE,CLEAN AND INSPECT DRAWWORKS. -BREAK OUT TOP DRIVE,CLEAN AND 'INSPECT SAVER SUB THREADS FOR TP/ 'APPROVAL. 22:00 - 00:00 2.00 CASREP P ' INTERV i CONTINUE RIH T/9422'MD CIRCULATING 1 DOWN F/9350'MD 3BPM. I-LATCH UPON RBP BY SETTING DOWN 8KLBS,VERIFY W/15KBLS OVERPULL. 1-PUW=166KLBS,SOW=135KLBS PRIOR TO LATCH UP. SPR#1 @ 30SPM=700PSI,@ 40SPM= 850PSI(9381'MD) SPR#2©30SPM=80PSI,@ 40SPM= 1040PSI(9381'MD) OA PRESSURE=OPSI LOSSES AT MIDNIGHT=OBBLS 9.8PPG BRINE IN AND OUT 3/23/2015 00:00 01:30 1.50 DHB P ■- OTHCMP I CIRCULATE 4 F HIGH VISC SWEEP SURFACEFACE T/SURFACE. -2850PSI C 6BPM Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 36 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 02:00 0.50 DHB P OTHCMP RELEASE RBP F/9427'MD,BULLHEAD 28BBLS @ 7.6BPM -ICP=90 PSI,FCP=1120PSI -MONITOR WELL(WELL ON VAC) ESTABLISH STATIC FLUID LOSS RATE (15BBL/HR)GOOD TO PROCEED -VERIFY RBP IS STILL ON RETRIEVAL TOOL BY RIH 5'PAST 9427'MD(PLUG APPEARS TO STILL BE ON RETRIEVAL TOOL) SPR#1©30SPM=700PSI,@ 40SPM= 850PSI SPR#2 @ 30 SPM=860PSI,@ 40SPM= 1040PSI 02:00 - 10:00 8.00 • DHB P • OTHCMP B/D TOP DRIVE,CHOKE AND KILL LINES -POOH F/9435'MD TI 6600'MD ON 4" MONITOR WELL 10 MINUTES,FLUID LOSS RATE 15 BPH. - LAY DOWN 4 3/4"DRILL COLLARS. • 10:00 - 12:00 2.00 DHB P OTHCMP PJSM.LAY DOWN 2 7/8"PAC HT DRILL PIPE. -LDDP F/5800'-2113'. LOSSES TO WELL BORE LAST(12)HRS= 113 BBLS OF 9.8 PPG BRINE. 12:00 - 12:30 0.50 RIGU P OTHCMP SERVICE EQUIPMENT ON RIG FLOOR AND PIPE SKATE. -PERFORM SPCC CHECKS,CROWN 0 MATIC, OK. 12:30 - 15:00 2.50 DHB P OTHCMP PJSM.CONTINUE TO LAY DOWN 2 7/8"DRILL • PIPE. -LAY DOWN DRILL PIPE TO PIPE SHED. CONTINUOUS HOLE FILL. LOSS RATE=15 BPH. 15:00 - 16:00 1.00 DHB P OTHCMP PJSM.RIH W/3 STANDS OF 4"DRILL PIPE. -LAY DOWN(9)JTS DRILL PIPE.LOSS RATE DECREASES TO 10 BPH. 16:00 - 19:00 3.00 RUNCOM P RUNCMP PREP T/RUN 3.5"X 4.5"VAMTOP TAPERED COMPLETION STRING -PULL WEAR BUSHING,CLEAN AND CLEAR RIG FLOOR OF TEST PLUG,WEAR BUSHING, RBP RUNNING TOOL,ETC. -SCRUB EXCESS BRINE F/FLOOR,M/U 3.5"X 4.5"FLOOR VALVES. -MOBILIZE HALLIBURTON TOOLS T/RIG FLOOR. -R/U DOYON CSG TQ TURN EQUIP. -PSJM F/RUNNING LNR Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 37 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 00:00 5.00 RUNCOM P RUNCMP RIH W/3.5"x 4.5"VAMTOP COMPLETION F/ SURFACE T/2000'MD -M/U SHOE TRACK AS PER RUNNING TALLY -BAKER-LOC ALL CONNECTIONS BELOW THE PACKER -USE JET LUBE SEAL GUARD THREAD COMPOUND ON ALL OTHER CONNECTIONS. ENSURE THREADS ARE CLEAN AND HAND START EACH CONNECTION,UTILIZING A STABBING GUIDE. -RUNNING SPEED=90'/MIN AS PER HALLIBURTON -TORQ TURN EACH 3.5"VAMTOP CONNECTION T/2900FT/LBS -HOLE LOSING FLUID @ 1OBBL/HR. -JT#45 DID NOT MAKE UP PROPERLY,LAY DOWN#44&#45,REPLACE W/#111 &#113. LOSSES F/NOON T/MIDNIGHT=113BBLS OA PRESSURE=30PSI 9.8PPG BRINE IN AND OUT 3/24/2015 00:00 - 03:00 3.00 RUNCOM P RUNCMP CONTINUE T/RIH W/3.5"X 4.5"TAPERED COMPLETION F/2000'MD T/3339"MD. -USE JET LUBE SEAL GUARD THREAD COMPOUND ON ALL OTHER CONNECTIONS. -ENSURE THREADS ARE CLEAN AND HAND START EACH CONNECTION,UTILIZING A STABBING GUIDE. -RUNNING SPEED=90'/MIN AS PER HALLIBURTON -TORQ TURN EACH 3.5"VAMTOP CONNECTION T/2900FT/LBS -HOLE LOSING FLUID @ 1OBBL/HR. 03:00 - 04:30 1.50 RUNCOM N RREP RUNCMP PJSM.SPRING ON HOSE REEL ON PIPE SKATE FAILED. -SHUT DOWN AND CHANGE OUT SPRING ON HOSE REEL. -MONITOR WELL,LOSS RATE=10 BPH. 1 FUNCTION TEST NEW SPRING,GOOD. 04:30 - 05:00 0.50 RUNCOM P RUNCMP CONTINUE TO RIH W/3 1/2"9.2#13CR-85 VAM TOP TUBING F/3339'MD T/3623'MD -PUW=65KLBS,SOW=70KLBS. -USING JET LUBE SEAL GUARD AND TORQUE TURNING EACH CONNECTION TO 2900 FT/LBS. -RAN 109 JTS OF 3 1/2",CHANGE OUT ELEVATORS AND TONG DIES AND M/U CROSSOVER JT TO 4 1/2". 05:00 - 11:30 6.50 RUNCOM P RUNCMP C/O T/4.5"HANDLING EQUIPMENT AND CONTINUE RIH W/4.5"12.6#VAMTOP COMPLETION F/3623'MD T/7217'MD -PUW=106KLBS,SOW=98KLBS. -RUN 4 1/2"12.6#13CR-85 VAM TOP TUBING AND GLMS AS SPECIFIED IN PROGRAM. -USING JET LUBE SEAL GUARD AND TORQUE TURNING EACH CONNECTION TO 4880 FT/LBS. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 38 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor.DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:30 - 13:00 1.50 RUNCOM P RUNCMP R/U HALLIBURTON CONTROL LINE&SHEAVE -M/U CONTROL LINE T/SSSVLN&TEST TI 5000PSI(GOOD TEST) OA PRESSURE=2OPSI @ NOON LOSSES©NOON=89BBLS 9,8PPG BRINE IN AND OUT 13:00 - 18:00 5.00 RUNCOM P RUNCMP CONTINUE TO RIH W/3.5"X 4.5"VAM TOP TAPERED COMPLETION STRING W/CONTROL LINE F/7217'MD T/9400'MD. -UTILIZE 54 FULL CONTROL LINE CLAMPS OVER EACH COLLAR AND 1 HALF CLAMP. -USING JET LUBE SEAL GUARD AND TORQUE TURNING EACH CONNECTION TO _ 4880 FT/LBS. 18:00 - 19:30 1.50 RUNCOM P RUNCMP M/U HANGER W/4.5"TCII LANDING JNT -HALLIBURTON/FMC TERMINATE THE CONTROL LINE THROUGH THE HANGER. -PRESSURE TEST CONTROL LINE SEALS ON HANGER T/5000PSI(GOOD TEST) -CLEAR FLOOR OF TORQUE TURN EQUIPMENT AND EXCESS TOOLS. 19:30 - 20:00 0.50 RUNCOM- P RUNCMP LAND TBG HANGER AS PER WSL/TP/FMC REP. -PUW=124KLBS,SOW=112KLBS -FMC RILDS,TORQUE T/SPEC(3.75"W/RUN IN) I-PULL LANDING JNT 20:00 - 22:00 2.00 RUNCOM P 1 RUNCMP WAIT ON CH2 CORROSION INHIBITED BRINE F/MI-SWACO -CLEAN RIG FLOOR OF EXCESS BRINE, REMOVE REMAINING TUBING F/PIPE SHED 22:00 - 00:00 2.00 RUNCOM P RUNCMP REVERSE CIRCULATE 160BBL OF CORROSION INHIBITED 120DEG 9.8PPG BRINE. -CIRCULATE @ 2.2BPM 180-190PSI -STOP,LINE UP,AND CIRCULATE 5BBLS DOWN TUBING. 1-WASH UP ON BALL SEAT @ 2BPM 1 OOPSI -DROP BALL AND ROD W/1-7/8"OD BALL AS 'PER HALLIBURTON(VERIFY OD OF BALL, 1-7/8") OA PRESSURE=40PSI @ MIDNIGHT LOSSES @ MIDNIGHT=117BBLS 9.8PPG BRINE IN AND OUT 3/25/2015 00:00 - 00:30 0.50 RUNCOM P RUNCMP !PJSM F/CIRCULATING T/LAND BALL AND ROD AND SETTING PKR. INSPECT CIRCULATION PATH,ANSWER CHALLENGE QUESTIONS(GOOD (RESPONSES) Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 39 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) . Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth ' Phase Description of Operations (hr) (usft) 00:30 - 01:30 1.00 RUNCOM N HMAN RUNCMP ATTEMPT T/LAND BALL AND ROD ON SEAT TO SET PACKER. -CONTINUE T/SEE RETURNS WHEN CIRCULATING INDICATING BALL AND ROD IS NOT IN PROFILE. • -CIRCULATE 2.5BBLS THE LONG WAY,LINE UP AND REVERSE CIRCULATE(t;2BPM W/ 300PSI F/5BBLS -ATTEMPT TO SEAT BALL AND ROD AGAIN THE LONG WAY,(NO SUCCESS) I-PRESSURE UP CIRCULATING SYSTEM T/ 1500PSI AND DUMP THE PRESSURE T/ ATTEMPT T/FLEX THE SYSTEM AND LAND BALLAND ROD(NO SUCCESS) -VARY CIRCULATION RATES BETWEEN 1-2.2BPM IN AN ATTEMPT TO FLEX PIPE AND LAND BALL AND ROD.(NO SUCCESS) 01:30 - 05:30 4.00 RUNCOM N HMAN RUNCMP 1CALL SUPERVISORS T/DISCUSS OPTIONS. BALLAND ROD FOUND T/BE IMPROPER SIZE F/RHC PROFILE -DECISION W/TOWN T/PULL BALL AND ROD AND DROP PROPER SIZE(1-5/16") -CALL OUT SLICK LINE ,-RIG UP DUTCH RISER SYSTEM IN PREP F/ SLICKLINE RUN 05:30 - 07:00 1.50 FISH N , HMAN RUNCMP STAGE SLICK LINE UNIT BESIDE RIG IN PREP FOR RETRIEVING BALLAND ROD -PREP FOR SLICKLINE RUN. 07:00 - 11:30 4.50 FISH N HMAN RUNCMP RIH W/SLB SLICK LINE T/RETRIEVE BALL 'AND ROD -PJSM W/CREWS,HES,AND SLB T/DISCUSS THE UPCOMING OPERATION. R/U SLICKLINE TOOLS,HANG SLB SHEAVE, M/U RETRIEVAL BHA. -RIH W/SLB RETRIEVAL BHA BELL GUIDE FISHING TOOL. I-ENGAGE FISHING NECK ON BALLAND ROD 9287'MD,POOH W/BALL AND ROD. 11:30 - 12:00 0.50 RUNCOM N HMAN RUNCMP UD BALLAND ROD,R/D SLB SLICKLINE TOOLS AND SHEAVE,UD DUTCH RISER. OA PRESSURE=20PSI @ NOON. LOSSES @ NOON=111BBLS. 9.8PPG IN AND OUT. 12:00 - 14:30 2.50 RUNCOM N HMAN ; RUNCMP R/U AND REVERSE CIRCULATE 140BBLS OF 9.8PPG CORROSION INHIBITED BRINE FOLLOWED BY 25BBLS OF 9.8PPG BRINE F/ THE PITS. -PUMP FLUID @ 2BPM=170-190PSI. -PUMP 5BBLS DOWN TUBING T/CLEAN UP ON TOP OF BALL SEAT(4)2BPM=120PSI. 14:30 - 15:00 0.50 RUNCOM N HMAN RUNCMP P/U AND M/U LANDING JOINT,DROP BALL AND ROD(VERIFY W/HES,TP,BALL AND ROD OD=1-5/16") -PULL LANDING JNT. Printed 4/6/2015 9:59:39AM North America-ALASKA-BP Page 40 of 40 Operation Summary Report Common Well Name:P2-10 AFE No Event Type:WORKOVER(WO) Start Date:2/22/2015 End Date:3/26/2015 X4-01120-E:(3,500,000.00) Project:Point McIntyre Site:Pt Mac 2 Rig Name/No.:DOYON 16 Spud Date/Time:5/19/1998 12:00:00AM Rig Release:3/27/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292288600 Active datum:P2-10 Updated @50.13usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase i Description of Operations (hr) (usft) 15:00 - 17:00 2.00 I- RUNCOM P RUNCMP SET PACKER,TEST TUBING AND IA,SHEAR DCK VALVE 1-LINE UP AND PUMP DOWN THE TUBING I UNTIL FLOW IS LOST OUT OF THE IA AND PRESSURE BEGINS TO RISE. -PERFORM LOW PT T/250PSI F/5MINS (GOOD TEST) WALK PRESSURE UP TO 2100PSI T/BEGIN PKR SETTING,CON'T PRESSURING UP T/ 3500PSI AND TEST TUBING F/30 CHARTED MINS.(GOOD TEST) i-BLEED DOWN TUBING T/2000PSI AND SHUT IN.PT IA T/250PSI LOW F/5MINS FOLLOWED I BY 3500PSI HIGH F/30 CHARTED MINS. (GOOD TEST) -BLEED OFF TUBING AND SHEAR DCK VALVE @ 3300PSI DIFFERENTIAL. -PUMP 5BBLS EACH WAY T/VERIFY SHEAR. 17:00 - 18:00 , 1.00 RUNCOM ` P RUNCMP !LRS RIG UP AND PUMP FREEZE PROTECT PJSM W/LRS AND RIG CREW. -PT LINES BACK TO LRS UNIT T/250PSI LOW, 3500PSI HIGH T/5MINS EACH. PUMP 18BBLS OF 80 DEGREE DIESEL @ '2BPM,ICP=650PSI,FCP=1100PSI 1-SHUT DOWN AND ALLOW WELL T/U-TUBE, F/1 HR. 18:00 - 20:00 2.00 RUNCOM P • RUNCMP R/D U-TUBE EQUIPMENT,CIRCULATE LINES AND DRAIN BOPE. 20:00 - 21:30 1.50 WHSUR P • RUNCMP i FMC REP INSTALL TWC/LRS PT TWC F/ BELOW T/250PSI LOW,3500PSI HIGH,F/5 CHARTED MINS.(GOOD TEST) 21:30 - 22:30 1.00 RIGD P POST FLUSH MUD PUMP,ALL SURFACE LINES,TOP I DRIVE,CHOKE AND KILL LINES,PRV ON MUD PUMP,DRAIN BOPE. 22:30 - 00:00 1.50 RIGD P POST PJSM/PULL MOUSE HOLE,RISER, TURNBUCKLES,KOOMEY LINES,KILL LINE, REMOVE REMAINING FLUID AND CLEAN PITS OA PRESSURE=20PSI @ NOON. LOSSES @ NOON=OBBLS. 9.8PPG IN AND OUT. 3/26/2015 00:00 - 01:00 1.00 I RIGD P POST PJSM,N/D BOPE,S/B ON PEDISTAL 01:00 - 02:30 t 1.50 RIGD P I POST CLEAN WELL HEAD,INSTALL HANGER NECK SEAL,FMC/HALLIBURTON PREP W.H.F/ CONTROL LINE/TERMINATE CONTROL LINE, HES TEST CONTROL LINE(GOOD TEST). 0230 - 05:00 2.50 RIGD P POST N/U ADAPTER FLANGE,FMC TEST VOID T/ 250PSI LOW 5000PSI HIGH(GOOD TEST), 05:00 - 06:00 1.00 RIGD P POST I SECURE CELLAR,R/D,M/O.RELEASE RIG @ j 06:00 ON 3/26/2015. Printed 4/6/2015 9:59:39AM Lo co Ul G \ \ \ ( 7.2 ea , ƒ § / } -61! . \ 0 a § 0 a 2 c m x / x / / x Z % < m CC f z / - f w < 7 < 7 f / ) } - + 2 0 z o a o e J c a §f \ k =.CO _ ..- u, _ 03 k ) k k § #co _ 7 f ; k CD - k § \ a) j \ .. 0 z ` o ) a 2- 'C ] � } ® § a * kx y / co ) I ) \ § _ \ a) C Ta « o « § o \ ƒ H o » ) ( ± i I _ i / ) } \ CO y ( k 0 § a 7 J § § _ # ) \ j re } k CO C \ k \ / \ \ ) 7 § is \ C To ) < 2 k / 2o / E ; a { ) y < \ 0 / J ~ cc I « Y 2 \ Z / / N " z / j } ƒ $ _ ® a ¥ / r ci E o ( 0) 7 § z \ 0 \ Cl) 3 J < ) Cl) a a) H k Sc / \ \ e ',.6 k — < z m ce O 2• \ } 0 0 < ) / y § D ± 2 2 / < ( ? \ 2 5 E < o o » _ ct in- Lo C.7 & ici ) CO § CO_ > o - = k \ ) \ e & -‘-'2 k CO o E g / ƒ 2 < = J { f o ) = e 2 b u $ § o E CO. f ) ; - ± '13® ® / CLe \ _ CZ N LJ | f � � � ƒ � � § f f ( / § ( / y \ k ` ) k ` . D. ( CO ( CO % •§ ° | f k \ t { § 2 § ) / © » $ ƒ \ 0 - & ( . E t - a' [ e / co _ o � w 0 = t o o ƒ } ) ) \ 2 ƒ U 0 0 j 7 / j 3 3 13 ] �» & § [ /< _ ta ) k2 j / Oao 4 « t � J3 k - zz 7k R J . a. \ L — - . 03 75 co 0 as - § \ - e0 � ° CO 0Z 1-0. _ — § A m e a. 0_ z aa .. % - a e k \ ) \ ` § 2 C # < « aac« .2 F, \ | £ ee E - z z - ) 7 /i z 0- - Z13- c'Zi 01 8 i ~ ` i \ k , k_ o 0 \ M 13 IIII 2 ii tri 12 12 \ e 3CL § \ \ « j / « \ � ■ k ! e » 7 3 * | k / \ © - ° # a k « f 5 ) 0 £ ii j 2 / , 0 k J ) Z k \ $ / } f \ - \ Q � w § _ : W w 3 0ce \ ) 3 0 « ) a 0 7 0 = e a ce 2 \ an 0 e ƒ o § § } ° \k \ 0 2 z E § § 7 2 # 74 £ 0 - 5 § 2 2 .. . . " ' CO \ af 777 \ u) co a a ct CO 5 \ k E | 2E \« / ( ) 2 2 ; - ` W — — ) ° 2 2 ) \ ) o/ )kE ƒ} ; \ -- m] \ // ` � , al o $ 2 / z - z z . _ I a o a) ; _ ) o ƒ j I z \ k o 0 3 & § f 0 LO e © / = ) » ' _ | / o m o ) f f § / § \ ) -1 * f a F- B { .. ƒ ! / ; f k k § ƒ j 4 ƒ J # 2 - ) \ \ ) % f k - ƒ } ' § 2 F 2 r Cl- -I = e 0 0 § a 0 a I- ! TREE= 4-1/16"CAN WELLHEAD= CNV P2-1 O CHROME BGS CSGLL REQUIRES A SSSV"` ACTUATOR= BAKER C OKB.ELEV= 50.13' I I BF.ELEV= / a D— 1975' H 9-5/8"EZ CEMENTER KOP= 1884' Max Angle= 34'©3397' _#CONDUCTOR, ? (� 2210' H4-112"HES SSSV NP,D=3.812' Datum MD= 9811' _ " Datum TVD= 8800'SS GAS LFT MANDRELS 9-5/8"CSG, 40#,L-80 BUTT-MOD,ID=8.835' H 5413' lib, ST MD TVD DEV TY FE VLV LATCH FORT DATE 4 3138 3014 33 KBG2 OCR BBC - 03/22/15 Minimum ID =2.750" @ 9299' 3 3959 3703 33 KBG2 OM( BK 0 03/22/15 3-1/2" OTIS X N NIPPLE "1 2 4777 4401 31 KBG2 DIN BK 0 03/22/15 1 5599 5107 29 KBG2 DMY BK 0 03/22/15 4-1/2'TBG,12.6#,13CR-85 VAM TOP,—{ 5746' • /-' l 5746' H 4-1 12"X 3-1/2"X0,D=2.992" .0152 bpf,D=3.958' TOP OF 5-1/2'SCAB LIR —I 5888' 5888' H 7-X 5-1/2"HRD-E ZXPN LTP w/HGR,D=4.870"J 7'PRODUCTION CSG LEAK(SOZ'D03/18/15) — 6500' 1--0, ' , ; 9170' 3-1/2"OTIS X NP,D=2.813" t vi 9201' H5-1/2"X 3-1/2"HES TNT PKR,D=2.830' 9237' H3-1/2"OTIS X NP,D=2.813" I ' , 9299' H 3-1/2"OTIS XN NP,D=2.750" 5-1/2'UPPER SCAB LNR,17#,L-80 TCB, —{ 9310' .., 47i .0232 bpf,D=4.892' 9304' H 7'X 5-1/2"HRD-E ZXPN LIP,D=4.90' x 7'CSG,26#,L-80 BUTT-M,.0383 bpf, D=6.276' 9330' 3-1/2'TBG,9.2#,13CR-85 VAM TOP, — 9412' I / \ 9412' H 3-1/2"WLEG,D=2.992" .0087 bpf,D=2.992" H ELMD IT NOT LOGGED 5-1/2"LNR 17#,L-80 TCB .0232 bpf,ID=4.892' 9461' l 1 9461' --15-12"X 4-1/2"XO,D=3.892' 4-1/2"TBG LEFT DH(RAO 03/2015) — —9465'-—9653' l 9463' —4-1/2"X 3 1/2'XO,D=2.992" GAS LIFT MANDREL 4-12"TBG STUB(01/08/15) H 9678' 1------_____. ST MD WD DEV TYPE VLV LATCH PORT DATE '6 9614 8654 5 KBG-2-LS DMY INT 0 08/14/06 3-1/2'LNR,9.2#,13-CR STL,.0087 bpf,D=2.992" H 9748' "NON OPERABLE-ISOLATED BY PACKERS PERFORATION SUMMARY 9681' H 7"X 4-1/2"BKR SPERM PKR,ID=3.875"J REF LOG: SINS CET ON 06/17/98 9724' Hr MARKERJONT BEHIND LNR ANGLE AT TOP FEW: 4°©9850' Note:Refer to Aoduction DB for historical pert data 9748' (3 1/2 HALF MULESHOE D=2.992 SIZE SPF INTERVAL Opn/Sqz SI-OT SQZ 3-3/8" 6 9850-9870 S 08/23/98 07/01/99 3-3/8" 6 9850-9870 0 07/24/99 9885'-10034'H SCALE MILLED TO 6.00"(04/23/11) 3-3/8" 6 9885-9900 S 08/24/98 07/01/99 �� 3-3/8" 6 9885-9900 0 07/24/99 e* 3-3/8" 6 9919-9929 0 03/01/02 61 3-3/8' 6 10000-10020 0 07/24/99 10035' —FISH:TBG TAIL:JUNK CATCHER,PLUG,X NIP, 3-318" 6 10000-10030 S 08/24/98 07/01/99 XN NP&WLEG(03/14/15) 1 °I'e,* } 10154' H PBT° a•..iZ4C1 7"CSG,29#,13CR-80 NSCC,.0371 bpf, D=6.184" --I 10234' DATE REV BY COMMENTS DATE REV BY COMMENTS POM MCNTY RE UNfT 08/23/98 N33E INITIAL COMPLETION WELL: P2-10 03/27/15 D-16 RWO FERMf:'1980970 03/30/15 PJC DRLG HO CORRECTION'S AR No: 50-029-22886-00 04/09/15 AW/JMD FINAL ODE APPROVAL SEC 11,T12N,R14E,7'FSL&1101'FWL BP Exploration(Alaska) PTD /%S - o y Loepp, Victoria T (DOA) From: Loepp,Victoria T(DOA) Sent: Tuesday, February 10, 2015 2:29 PM To: Warren,Abigail M' Subject: RE: P2-10(PTD 198-097, Sundry 314-674) RWO Change I will update the sundry with this change- From: Warren, Abigail M [mailto:Abigail.Warren@bp.com] Sent:Tuesday, February 10, 2015 11:00 AM To: Loepp, Victoria T(DOA); Ramos,Tania (UOSS) Cc: Lastufka,Joseph N Subject: P2-10(PTD 198-097, Sundry 314-674) RWO Change Victoria, Just to give you a heads up, I had specified a 15.8 ppg slurry in the Sundry for P2-10 (#314-674) and it is actually a 15.3 ppg slurry. The reason for this change is it lowers pump pressures at surface making it so that we can pump at a higher rate. Please let me know if you have any questions. Thanks Abby Warren SCANNED �' ,;, 4: , From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent: Tuesday, December 23, 2014 8:51 AM To: Ramos,Tania (UOSS); Warren,Abigail M Cc: Lastufka,Joseph N Subject: RE: P2-10 Sundry I'll insert this into the sundry- From: Ramos,Tania (UOSS) [mailto:Tania.Ramos@bp.com] Sent:Tuesday, December 23, 2014 8:38 AM To: Loepp, Victoria T(DOA) Cc: Lastufka, Joseph N Subject: FW: P2-10 Sundry Good morning Victoria, We submitted a 10-403 for P2-10 to AOGCC on 12/17/14 and is still in your review. Per the email from the Drilling Engineer, Abby Warren below regarding a missing set of 20' of perforations, do you require a revision or anything additional for this Sundry application? Thank you, Tania Ramos Information &Data Technologist BP Exploration (Alaska) Inc. 1 900 E. Benson Blvd MB 7-1 Anchorage, AK 99508 Direct: 907.564.5058 Fax: 907.564-4014 Cell: 907.947.7727 Email:tania.ramos(a�bp.com WO tl of Il went 3fUknu mon From: Warren, Abigail M Sent: Monday, December 22, 2014 2:51 PM To: Lastufka, Joseph N; Ramos,Tania (UOSS) Subject: P2-10 Sundry Not sure if it matters but looking back at the Sundry I missed one set of perforations we plan on doing. It is only 20'of perf so I don't think that it would really matter, but 10000-10020'is the fourth set of perfs which we planning on shooting on P2-10 Let me know if you need anything from me or if I need to get ahold of Victoria for this. Thanks Abby Warren Drilling Engineer BPXA W-564-5720 C-240-9293 2 • • I bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 20, 2012 Mr. Jim Regg 0 ` 2012 Alaska Oil and Gas Conservation Commission 333 West 7"' Avenue Anchorage, Alaska 99501 19 g '47 Subject: Corrosion Inhibitor Treatments of GPMA PM -2 pg- 10 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA PM -2 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, G( Mehreen Vazir BPXA, Well Integrity Coordinator 0 • BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) GPMA PM -2 Date: 04/30/2012 Corrosion Vol. of cement Final top of Cement top Corrosion inhibitor/ sealant Well Name PTD # API # Initial top of cement pumped cement off date inhibitor date ft bbls ft na gal P2 -01 1970730 50029227610000 0.3 NA 0.3 NA 1.70 6/22/2009 P2-03 1970440 50029227490000 2.0 NA 2.0 NA 1020 6/22/2009 P2-04 1981560 50029229070000 1.0 NA 1.0 NA 5.10 6/22/2009 P2-06 1931030 50029223880000 4.0 NA 4.0 NA 30.60 6/22/2009 P2-07 1940580 50029224690000 2.0 NA 2.0 NA 13.60 6/22/2009 P2-08A 2061690 50029228960100 0.8 NA 0.8 NA 4.30 6/21/2009 P2-09 1980660 50029228760000 0.3 NA 0.3 NA 0.85 6/21/2009 P2 -10 1980970 50029228860000 0.3 NA 0.3 NA 1.70 6/21/2009 -37 P2 -11A 2060260 50029229230100 3.5 NA 3.5 NA 69.70 6/21/2009 P2 -12 1931150 50029223950000 Sealed conductor NA NA NA NA NA P2 -13 1970600 50029227570000 0.5 NA 0.5 NA 2.60 6/21/2009 P2 -14 1981050 50029228880000 1.5 NA 1.5 NA 10.20 6/21/2009 P2 -15A 2070320 50029224090100 Sealed conductor NA NA NA NA NA P2 -16 1931230 50029223970000 3.0 NA 3.0 NA 28.10 6/20/2009 P2 -17 1981370 50029229020000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -18 1940600 50029224710000 0.8 NA 0.8 NA 2.60 6/20/2009 P2 -19A 2070120 50029227650100 0.3 NA 0.3 NA 0.90 6/20/2009 P2 -20 1960590 50029226640000 0.5 NA 0.5 NA 2.60 6/20/2009 P2 -21 1940530 50029224670000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -22 1972490 50029228500000 1.0 NA 1.0 NA 7.70 6/20/2009 P2 -23 1940320 50029224530000 1.3 NA 1.3 NA 11.10 6/20/2009 P2 -24 1980080 50029228540000 1.5 NA 1.5 NA 1020 6/15/2009 P2 -25 1971110 50029227760000 1.8 NA 1.8 NA 17.90 6/10/2009 P2 -27 1971250 50029227850000 1.3 NA 1.3 NA 8.50 6/10/2009 P2 -28 1950440 50029225510000 3.3 NA 3.3 NA 37.40 4/18/2012 P2 -29 1931470 50029224070000 10.3 NA 10.3 NA 71.40 6/15/2009 P2 -30 1920950 50029222890000 2.8 NA 2.8 NA 17.90 6/10/2009 P2 -31 1940360 50029224560000 22 NA 22 NA 21.30 6/20/2009 P2 -32 1951350 50029225930000 Surface casing leak NA NA NA NA NA P2 -338 1972310 50029228120200 2.0 NA 2.0 NA 16.60 6/9/2009 P2 -34 1950660 50029225580000 1.5 NA 1.5 NA 11.50 6/9/2009 P2 -35 1951790 50029226200000 1.0 NA 1.0 NA 13.60 6/9/2009 P2 -36A 2060220 50029228010100 1.1 NA 1.1 NA 6.00 6/9/2009 P2 -37A 2050570 50029225760100 2.0 NA 2.0 NA 23.00 6/9/2009 P2 -39 2111230 50029234540000 0.8 NA 0.8 NA 10.20 4/30/2012 P2-40 1972260 50029228370000 0.5 NA 0.5 NA 5.10 6/9/2009 P2-41 1952050 50029226330000 1.5 NA 1.5 NA 17.00 6/9/2009 P2-42 1931430 50029224050000 19.3 NA 19.3 NA 121.60 6/20/2009 P2 -43 2050240 50029232500000 0.8 NA 0.8 NA 6.00 6/8/2009 P2-44 1960630 50029226660000 2.3 NA 2.3 NA 23.80 6/8/2009 P2-45B 2080210 50029227690200 0.8 NA 0.8 NA 5.10 6/8/2009 P2-46 1931320 50029224010000 2.3 NA 2.3 NA 25.50 6/8/2009 P2-47 1951900 50029226280000 0.0 NA 0.0 NA NA NA P2-48 1921260 50029223090000 0.2 NA 02 NA 1.70 4/18/2012 P2-49 1920240 50029222520000 2.5 NA 2.5 NA 18.70 6/7/2009 P2 -50B 1950960 50029222610200 2.0 NA 2.0 NA 23.00 6/8/2009 P2 -51 1920380 50029222620000 0.3 NA 0.3 NA 0.85 6/7/2009 P2 -52 1972010 50029228260000 3.8 NA 3.8 NA 47.60 6/7/2009 P2 -53 1960410 50029226560000 2.0 NA 2.0 NA 21.30 6/7/2009 P2 -54A 2030300 50029224700100 0.8 NA 0.8 NA 3.40 6/7/2009 P2 -55 1920820 50029222830000 4.0 NA 4.0 NA 79.90 6/22/2009 P2 -56 1951620 50029226100000 2.8 NA 2.8 NA 17.90 6/7/2009 P2 -57A 2022140 50029221830100 15.5 NA 15.5 NA 77.40 6/22/2009 P2 -58 1900080 50029220000000 Sealed conductor NA NA NA NA NA P2 -59A , 1982010 50029220960100 Sealed conductor NA NA NA NA NA P2-60 1910910 _ 50029221920000 _ 8.3 NA 8.3 NA 56.10 3/13/2012 STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMISSIO REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate El Other Q MILL/UNDERREAM Performed: Alter Casing F Pull Tubing Perforate New Pool 0 Waiver[ Time Extension SC .4 L Change Approved Program O erat. Shutdown[ Perforate Re -enter Suspended Well E P ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development ❑� Exploratory ❑ - 198 -0970 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 , -50- 029 - 22886 -00 -00 8. Property Designation (Lease Number) : 9. Well Name and Number: ADLO- 365548 - P2 -10 10. Field /Pool(s): PRUDHOE BAY FIELD / PT MCINTYRE OIL POOL 11. Present Well Condition Summary: Total Depth measured 10250 feet Plugs (measured) None feet true vertical 9287.8 feet Junk (measured) None feet Effective Depth measured 10154 feet Packer (measured) 9681 feet true vertical 919 feet (true vertical) 8721 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 117' 20" SURFACE - 117 SURFACE - 117 Surface 5375' 9 -5/8" 40# L -80 SURFACE - 5413 SURFACE - 4944 5750 3090 Production 10198' 7" 29# 13CR80 SURFACE - 10234 SURFACE - 9272 8160 7020 Production Liner Liner L t 1 1 0 Perforation depth: Measured depth: SEE ATTACHED - True Vertical depth: Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# 13CR SURFACE - 9736 SURFACE - 8775 Packers and SSSV (type, measured and true vertical depth) 7" X 5 -1/2" BAKER PERM PKR 9681 8721 RECEIVED 12. Stimulation or cement squeeze summary: N 3 0 2 0 1 0 Intervals treated (measured): a �8 1i. , & Cons. vowu sia Treatment descriptions including volumes used and final pressure: ApIcher ge 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 88 448 1712 697 Subsequent to operation: 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory 1:1 Development 2 Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 116. Well Status after work: Oil - [ Gas LJ WDSPL LJ I GSTOR ❑ WINJ ❑ WAG[:] GINJ ❑ SUSP❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed Na W Title Data Manager Signat Phone 564 -4091 Date 11/29/2010 7 � Form 10-404 BWI Q70 N�V $ 0 1010 fiet /Z /v Submit Original Only P2 -10 198 -097 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 1 -10 8/23/98 PER 9,850. 9,870. 8,888.87 8,908.82 P2 -10 8/24/98 PER 9,885. 9,900. 8,923.78 8,938.74 P2 -10 8/24/98 PER 10,000. 10,030. 9,038.5 9,068.43 P2 -10 7/1/99 SQZ 9,846. 10,030. 8,884.89 9,068.43 P2 -10 7/24/99 APF 9,885. 9,900. 8,923.78 8,938.74 1 -10 7/24/99 APF 10,000. 10,020. 9,038.5 9,058.45 1 -10 7/24/99 RPF 9,850. 9,870. 8,888.87 8,908.82 P2 -10 11/13/01 FIL 10,017. 10,154. 9,055.46 9,192.1 1 -10 3/1/02 APF 9,919. 9,929. 8,957.69 8,967.66 AB ABANDONED PER PERF • APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • P2 -10 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 11 /26/20101 CTU #9 w/ 1/75" CT [ Scop Mill and underream scale in tubing and liner Road unit from J -18 to bridge before PM2. Found slick road (hill)/WO sander I __ _ 11/27/2010 CTU #9 w/ 1.75" CT ��� 'Scope: Mill and underream scale in tubing and liner Move unit across bridge. MIRU. RU, RIH w/3.7" BOT milling assembly. Mill scale from 5740'- 6180'. Hard scale from 6143' -6180' (SO). RIH to Tbg Tail, Sweep & ;POOH. LD BTT milling assy. RIH WFT UR'ing assy w/ 6.0" blades « « <Continued on WSR 11- 28 -10 » »> � l f 11/28/201010 #9 w/ 1.75" CT «<,Continued from 11- 27 -10 » »» 'Scope: Mill and underream scale in tubing and liner IFinish RIH w/ UR assy. RIH w/o pumping to wt loss at 9996'. UR from 9760' CTD to 10060' with minimal solids found from 10012 - 10060'. Drop ball, circ out, POOH. 3 FP CT, well & FL with 60/40 McOH. Well S /I, L1 Flow line pigging in progress, will ? test well when pigging completed. RD WFD tools, ball recovered. Cut 50' Pipe. RD E MOL. to E -05B. « « « « <Job Completed » » » » »> i t E FLUIDS PUMPED BBL 100 60/40 McOH 220 1% XS SL 360 1 % XS KCL 680 TOTAL TREE= CIW4- 1 /1 6 "SM WELLHEAD= _CNV TUATOt� =BAKER C P2-1 O S SG AFETYNOTES:'CHROMETBG& Ca C KB. R EV = 50.13' BF. ELEV = KOP = 1884' Max Angle = 34 @ 3397' 2211' 4 -1/2" CAMCO BAL -O NIP, Datum MD = 9811' 4 -1/2" WRDP -2 SSSV, ID = 3.81" Datum TV D = 8800' SS 9 -518" CSG, 40 #, L -80, ID = 8.835" 5413' Minimum ID = 3.725" @ 9723' 4 -112" HES XN NIPPLE GAS LIFT MANDRELS STI MD TVD IDEVI TYPE VLV I LATCH PORT DATE 7" CSG, 26 #, L -80, ID 6.276" 933-0' 1 4494 4156 30 KBG -2 -LS DOME INT 16 09/03/06 2 6193 5622 30 KBG -2 -LS SO INT 20 09/03/06 3 7694 6900 29 KBG -2 -LS DMY INT 0 08/14/06 4 8801 7878 25 KBG -2 -LS DMY INT 0 5 9389 8431 10 KBG -2 -LS DMY INT 0 04/18/04 6 9614 1 8654 1 5 1 KBG-2-LSj DMY I INT 1 0 08/14/06 9681 7" X 5 -1/2" BAKER PERM PKR 9713 4 -112" HES X NIP, ID = 3.81" 9723 4 -1/2" HES XN NIP, ID = 3.72" 4 -1/2" TBG, 12.6 #, 13 -C R, .0152 bpf, ID = 3.958" 973V 9734 4 -2/3" TUBING TAIL WLEG PERFORATION SUMMARY 9735 R MD TT LOGGED 06/17/98 REF LOG: SWS CET ON 06/17/98 ANGLE AT TOP PERF: 4 @ 9850' Note: Refer to Production DB for historical pert data SIZE SPF I INTERVAL Opn /Sqz DATE 3 -3/8" 6 9850-9870 O 07/2799 3 -3/8" 6 9885-9900 O 07/24/99 3 -3/8" 6 9919-9929 O 03/01/02 3 -3/8" 6 10000 - 10020 O 07/24/99 3 -3/8" 6 10020 - 10030 C 08/24/98 TO OF CEMENT DONUT 1 I CEMENT DONUT, ID = 5.9" : :10034' PBTD 10154' 7" CSG, 29 #, 13CR80, ID = 6.184" — 10234' — DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNIT 08/23/98 ORIGINAL COMPLETION 08/03/07 DTR/SV CORRECTIONS WELL: P2 -10 08/28/01 RN/KAK CORRECTIONS 03/19/10 SV CORRECTIONS PERMIT: 1980970 03/02/02 TMN/KK ADPERFS API No: 50- 029 - 22886 -00 04/18/04 KS /KAK GLV C/O S 11, T I 2N, R1 4 E, 374 4.64' FEL & 1557.9' FNL 08/14/06 BSE/TLH GLV C/O 09/03/06 1 KSB /PAG GLV C/O BP Exploration (Alaska) Schlumberger Alaska Data & Consulting Services 2525 Gambell Street. Suite 400 Anchorage. AK 99503-2838 A TTN: Beth Well 17-14 MPC-10 17-01 P2-30 L 1-31 P2-10 17-03A C-26 15-07C D-04B P2-24 P2-03 09-44 09-23 2-52/S-41 F-08A 02-16C L2-32 L5-09 02-12B 18-09B G-14A 05-20B Job# N/A 11767137 11824337 11686776 11865639 11846804 N/A 11824342 11594517 11591451 11865643 11855502 11855501 11824337 11846807 11638646 11628790 11695060 11492259 11767132 11366500 11485777 10942220 SCANNED SEP 1 8 2007 Log Description JEWELRY/SBHP IMA- / ~4 -lIAr. MEM INJ PROFILE I >Tl' /"lC, _("}/K' SBHPS/JEWELRY LOG /'lJ() -055"' PRODUCTION PROFILE I C) ~ - (-P¡,~ LDL 'C>.L-.L::' PRODUCTION PROFILE ,q 11 - fA '+ JEWELRY/SBHP /CJ'+-tJ./I_ LDL It:t"is' - 1../~ SBHP SURVEY .::)f"'I~- Oq.q SBHP SURVEY ;Jö3 - IIi) PRODUCTION PROFILEIC¡SC - ('1/'")'1< PRODUCTION PROFILE 1C1~ - ö4t../ SBHP/JEWELRY /O¡t') -I Q~_ SBHP/JEWELRY t~ - ~ PRODUCTION PROFILE I~-: - f'lt:1 ~ USIT :J()«q -0 SCMT dar-()'7t) RST I ,"'"'(\ \~~ _I~-:} .... 1."\ /4(", RST /C r1- I!J(./ '*- ,K¿JI"+ MCNL ¡.':)(")--:¡'-(y<:;''J( .. ~ ..... MCNL I'Hr- cr+1r #- 1."\41C) MCNL Io,~ -()~? 11: ~Llo.h MCNL .:In£J - :::r:~ <./ .. l!r<-I::J I PLEASE ACKNOWLEDGE RECEIPT B~",~~~~!~J\~~rpre~lrfNE COPY EACH TO: BP Exploration (Alaska) Inc. ~.."'t¡ ~""- q:, }' t:, iJ \þ !1~_, 0,,~i' Petrotechnical Data Center LR2-1 ~ Ì\, !\~-~ '-, ,. 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: SEP i\'007 í " ("1\" \ OII\\\ILJ3tGf¡ /\1:~:j~3~'\fJ ()H /, (~nc }ï}.;)· - J Date 08/17/07 08/13/07 08/15/07 08/25107 08/14/07 08/17/07 08/17/07 08/22/07 08/23/07 08/24/07 08/21/07 08119/07 08/16/07 08/16/07 08/18/07 06/28/07 08/24/07 OS/23/07 11/11/06 06/21/07 10/23/06 11/27/06 06/26/05 NO. 4406 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave. Suite 100 Anchorage, AK 99501 BL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Field: Prudhoe Bay Endicott Color CD 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 -- AZJ2" ,."."" ATTN: Beth I Received by: ^--- 09/10107 . . '. -' STATE OF ALASKA '-~ . ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other_X 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360 Anchora~le, AK 99510-0360 4. Location of well at surface 5270' FNL, 4179' FEL, Sec. 11, T12N, R14E, UM At top of productive interval 3694' FSL, 1551' FWL, Sec. 11, T12N, R14E, UM At effective depth At total depth 1558' FNL, 3745' FEL, Sec. 11, T12N, R14E, UM 5. Type of Well: Development X Exploratow__ Stratigraphic__ Service__ 6. Datum elevation (DF or KB feet) RKB 50 feet 7. Unit or Property name Point Mclntyre Unit 8. Well number P2-10 9. Permit number / approval number -98-97 10. APl number 50-029-22886 11. Field / Pool Point Mclntyre Oil Pool 12. Present well condition summary Total depth: measured true vertical 10250 feet Plugs (measured) 9288 feet Tagged PBTD @ 10075' MD (7/24/1999) Effective depth: measured true vertical 10075 feet Junk (measured) 91 13 feet Casing Length Conductor 117' Surface 5375' Production 10198' Size Cemented 20" Ddven 9-5/8" 1427 Sx Coldset III & 405 Sx G 7" 250 sx Class G Measured Depth True vertical Depth 117' 117' 5413' 4944' 10234' 9272' ORIGINAL Perforation depth: measured 9850' - 9870'; 9885' - 9900'; 10000' - 10020'. true vertical 8889' - 8909'; 8924' - 8939'; 9038' - 9058'. Tubing (size, grade, and measured depth) ~ackers & SSSV (type & measured depth) 4-1/2"12.6#, 13-CR Tbg @ 9736' MD. Backer 7" S-3 Perm Packer @ 9681' MD. 4-1/5" CAMCO BAL-O NIPPLE, 4-1/2" WRDP PULLED 6/24/99 @ 2215' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. OiI-Bbl Prior to well operation 912 Subsequent to operation 789 Representative Daily Average Production or Injection Data Gas-Mcr Water-Bbl 795 3488 317 616 Casing Pressure Tubing Pressure 811 755 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil __X Gas __ Suspended __ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Erin Oba Form 10-404 Rev 06/15/88 · ~'. ~-)~Title ARCO Engineering Supervisor Date Pre ~e~b~'y P~4990 SUBMIT IN DUPLICATE · P2-10 "~ DESCRIPTION OF WORK COMPLETED CEMENT SQUEEZE FOR WATER SHUTOFF / PERFORATING OPERATIONS Date Event Summary 6/26/1999: 6/28/1999: 6/30/1999: 7/01/1999: 7/12/1999: 7/13/1999: 7/20/1999: 7/22/1999: 7/24/1999: 8/29/1999: RIH & jetted scale across perforations, up in tubing, & across all GLM's. RIH & milled soft scale f! 9400' to 9700' MD. RIH & tagged PBTD @ 10053' MD. PT'd IA to 2500 psi - passed. A CTU Cement Squeeze for Water Shutoff was performed as follows: MIRU CTU. PT'd equip to 4000 psi. Killed well. RIH & tagged PBTD @ 10053' MD. Reciprocated across perfs the following fluid schedule: (a) 21 bbls of 50% Diesel - 40% Xylene - 10% Musol, followed by (b) 90 bbls of 2% KCL Water, followed by (c) shutdown. Pumped 15 bbls of 15.8 ppg Neat Latex Acid Resistive Cement, followed by 30 bbls of LARC w/Aggregate, followed by 5 bbls LARC into the open perforation intervals @: 9850'- 9870' MD Reference Log: SWS CET 6/17/1998. 9885'- 9900' MD 10000' - 10030' MD LARC has mag-oxide expansive additive. Placed 20 bbls of LARC behind pipe @ max sqz press of 4000 psi WHP. Contaminated Cement w/Biozan & cleaned out contaminated Cement to 9846' MD. FP'd well. POOH w/CT. Left 1000 psi on wellhead. RD. MIRU CTU. PT'd equip. RIH w/UR & tagged TOC @ 9826' MD. UR'd to 9849' MD. UR'd to 9855' MD. POOH w/UR. RD. RIH & UR'd to 9872' MD. RIH & UR'd to 10050' MD. RIH & tagged PBTD @ 10075' MD. RU ELU. RIH w/perforating guns & reperforated 55' of as follows: 9850'- 9870' MD 9885'- 9900' MD 10000' - 10020' MD Used 3-3/8" carriers & all shots @ 6 SPF, 60° phasing, & random orientation. POOH w/ guns. ASF. RD. Pumped 40 bbls hot Crude in tubing & 240 bbls of hot Crude down the IA. Returned well to production & obtained a valid welltest. Wel c°mpiianc R port File on Left side of folder 198-097-0 MD 10250 Microfilm Roll POINT MCINTYRE TVD 09288 f Completion Date: / Roll 2 / P2-10 50- 029-22886-00 BP EXPLORATION (ALASK ~~8 Completed Status: 1-OIL Current: Name Interval D 8455 ~ SPERRY MPT/GR/EWR4/CNP/SLD OH ~.- Sent Received T/C/D 6/17/98 6/19/98 5/12/00 5/12/00 7/21/98 7/24/98 7/1/98 7/1/98 7/1/98 7/1/98 7/1/98 7/1/98 3/12/99 3/18/99 /~ - (~ I 7/21/98 7/24/98 2/26/99 3/3/99 oq~l L RST/B ! .~Iq~AL 9700~10055 CH 5 Daily Well Ops ~_///~c~j~ .../ / ,[~.3Q//~ Are Dry Ditch Samples Required? yes Was the well cored? yes o~__. Analysis Description ' Comments: _ ~And Receive d ?---y~.~--- S a m~p-le~Fff~~ Tuesday, August 01, 2000 Page 1 of 1 ( .... TRANSMITTAL ProActive Diagnostic Services, Inc. To: ARCO Alaska, Inc. AOGCC Lori Taylor 3010 Porcupine Drive Anchorage, Alaska 99501 RE · Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Robert Richey PDS, Inc. Mail Pouch 340112 Prudhoe Bay, AK 99734 ., LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT(S) OR CD-ROM REM BLUE LINE Open Hole I I 1 ..... Res. Eval. CH I I 1 I.q.%. o~"-q P2-1'0' Mech. CH 1 Caliper Survey I Signed' [:)ate'~A¥ 1 2 20i)0 Print Name: Alaska 0il 8, 6~s Cons. t;ommissior, Anchorage ProActive Diagnostic Services, Inc., Pouch 340112, Prudhoe Bay, AK 99734 Phone:(907)659-2307 Fax:(907)659-2314 E-mail: pdspmdhoe~NAS00.net Website: ~-_;~c. morvb~.cam C:WIy Documents~stribution_FormsLArco_ptmac_form. doc 3/12/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 AI'I'N: Sherrie NO. 12428 Company: Alaska Oil & Gas Cons Comm ( Attn: Lori Taylor I 3001 Porcupine Drive Anchorage, AK 99501 Field: Point Mclntyre Floppy LIS Well Job # Log Description Date Blueline Sepia Disk Tape Pi-04 PRODUCTION PROFILE 990226 1 1 P2-10 PRODUCTION PROFILE W/DEFT 990225 1 1 P2-20 PRODUCTION PROFILE W/DEFT 990226 1 1 P2-30 PRODUCTION PROFILE 990308 1 1 P2-30 DEFT 990308 1 1 .... RECEIV' SIGNE DATE: I_/!~R '~ 8 AI~A,~ Oil & Gas 6of~s. Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 562-~'21. Tha~ 2/26/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 Al-f N: Sherrie NO. 12376 Companl Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Point Mclntyre Floppy LIS Well Job it Log Description Date BL Sepia Disk Tape P2-'10 RS?-BORAX 990'122 1 1 P2-24 RS'~-BORAX 981224 1 1 SIGNE~~~ Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) ~EIJ~.· Thank ~,, ~,,.,: ,. ,:, . Oil & 6as Oou~. 6o~uli~Bsiot~ . STATE OF ALASKA - ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of S~DL(;.e Well .... "/ [~ Oil [--] Gas E~] Suspended I~ Abandoned 1~ Service'"°*(a- ()it~ ,,, ~,,.~ 2. Name of Operator 7. Permit Number ARCO Alaska Inc. 98-97 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22886 '4. Location of well at surface i- '::; ;'(;:'?:; ii.~!~ 'i:~~"~. ~'!" ~:' ;~!i~' 9. Unit or Lease Name 7' NSL, 1101' EWL, SEC 11, T12N, R14E, UM ' ' .... ~"'""'~Ml~-'~i Point Mclntyre At top of productive interval ~_..~-~ 10. Well Number 3694' NSL, 1551' EWL, SEC. 11, T12N, R14E, UM - " , ..... ~ ..... ~ .... ,.~~ P2-10 Attot,al depth , .! ~/Z~i ..... !. ~-.---~ 11. Field and Pool 3717 NSL, 1531 EWL, SEC 11, T12N, R14E, UM Point Mclntyre 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 50.13'I ADL 365548 12. Date Spudded5/13/98 I 13' Date I'D' Reached I14' Date C°mp'' susp'' °r Aband'll 5' Water depth' if OffshOre I 16' NO' Of COmpletiOns5/22/98 08/23/98 (completed) , N/A MSL, One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 119. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 10250 9288 FT 10154 9192 FTI [~Yes [~No1 2210 MDI 1800' (Approx.) 22. Type Electric or Other Logs Run MWD/LWD, RFT 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO-FI-OM SIZE CEMENTING RECORD AMOUNT PULLED 20" 133# H-40 40' 117' 30" Driven 9-5/8" 40# L-80 38' 5413' 12-1/4" 1427 sx Coldset III, 405 sx Class 'G' 7" 26#/29# L-80/13CR 36' 10234' 8-1/2" 250 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SlZE DEPTH SET (MD) PACKER SET (MD) See Attached Sheet 4-1/2", 12.6# 9736' 9681' MD TVD MD TVD ..... 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect with 60 bbls diesel 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) August 28, 1998I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE ]GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF ;WATER-DEL O~b GRAWTY-API (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Top Kalubik 9834' 8873' Zone MZU B* 9900' 8939' Zone MZU A* 10015 9053' *Top Kuparuk 31. List of Attachments Summary of Daily Drilling Reports, Survey 32. I hereby certify that th/~, regoing ~/;, ~nd correct to the best of my knowledge S~.~e d ' ~//KJ~/~ ~-~' Lowell Crane \ Title Drilling Engineering Supervisor Date ~.-/~,~,¢~ P2~10// 98-97 Prepared By Name/Number: Carol Withey, 564-4114 Well N~er Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM ,5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 1§ AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 2?: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 WELL NAME: P2-10 24. (10-407) Attachment- Perforations open to Production 9-1/2" Gun Diameter, 4 spf 9850'- 9870' MD 8889'- 8909' TVD 3-3/8" Gun Diameter, 6 spf 9885'- 9900' MD 8924'- 8939' TVD ........ 10000' - 10030' MD 9038' - 9068' TVD , ,, Progress Report Facility Pt Mac 2 Well P2-10 Rig ~~99~¢ Page 1 Date 09 September 98 Date/Time 13 May 98 01:30-04:00 04:00-06:00 06:00-12:00 12:00-14:00 14:00-16:30 16:30-18:00 18:00-20:00 20:00-22:00 22:00-02:00 14 May 98 02:00-04:00 04:00-06:00 06:00-16:00 16:00-16:30 16:30-06:00 15 May 98 06:00-07:00 07:00-08:00 08:00-13:00 13:00-16:30 16:30-19:00 19:00-20:00 20:00-06:00 16 May 98 06:00-12:30 12:30-13:30 13:30-17:00 17:00-19:30 19:30-21:00 21:00-21:15 21:15-00:00 17 May 98 00:00-04:30 04:30-06:00 06:00-08:30 08:30-08:45 08:45-13:30 13:30-17:00 17:00-17:15 17:15-18:15 18:15-19:00 19:00-20:00 20:00-20:15 20:15-20:30 20:30-21:45 21:45-22:30 22:30-04:00 18 May 98 04:00-06:00 06:00-07:30 07:30-13:30 13:30-14:30 14:30-04:00 19 May 98 04:00-06:00 06:00-09:00 09:00-09:15 09:15-14:00 14:00-14:30 14:30-15:00 Duration 2-1/2 hr 2 hr 6 hr 2hr 2-1/2 hr 1-1/2 hr 2hr 2hr 4 hr 2hr 2hr 10hr 1/2 hr 13-1/2 hr lhr 1 hr 5 hr 3-1/2 hr 2-1/2 hr lhr 10hr 6-1/2 hr lhr 3-1/2 hr 2-1/2 hr 1-1/2 hr 1/4 hr 2-3/4 hr 4-1/2 hr 1-1/2 hr 2-1/2 hr 1/4 hr 4-3/4 hr 3-1/2 hr 1/4 hr 1 hr 3/4 hr lhr 1/4 hr 1/4 hr 1-1/4 hr 3/4 hr 5-1/2 hr 2hr 1-1/2 hr 6hr lhr 13-1/2 hr 2 hr 3hr 1/4hr 4-3/4 hr 1/2 hr 1/2 hr Activity Rig moved 100.00 % Fill pits with Water based mud Fill pits with Water based mud (cont...) Singled in drill pipe to 450.0 ft Made up BHA no. 1 Cleared B ell nipple Held safety meeting Drilled to 220.0 ft Made up BHA no. 1 Functioned Survey instruments Drilled to 500.0 ft Drilled to 500.0 ft (cont...) Took Gyro survey at 1400.0 ft Drilled to 3300.0 ft Drilled to 3550.0 ft (cont...) Circulated at 3550.0 ft Pulled out of hole to 1184.0 ft R.I.H. to 3550.0 ft Drilled to 3924.0 ft Serviced Mud pumps Drilled to 5000.0 ft Drilled to 5425.0 ft (cont...) Circulated at 5425.0 ft Pulled out of hole to 1125.0 ft R.I.H. to 5425.0 ft Circulated at 5425.0 ft Flow check Pulled out of hole to 1124.0 ft Pulled BHA Installed Casing handling equipment Installed Casing handling equipment (cont...) Held safety meeting Ran Casing to 5412.0 ft (9-5/8in OD) Circulated at 5412.0 ft Held safety meeting Mixed and pumped slurry - 310.000 bbl Displaced slurry - 403.000 bbl Circulated at 1977.0 ft Held safety meeting Pumped Water spacers - volume 40.000 bbl Mixed and pumped slurry - 272.000 bbl Displaced slurry - 140.000 bbl Rigged down Casing handling equipment Installed Casing head Installed Casing head (cont...) Serviced BOP stack Rigged up BOP stack Repaired Bell nipple Rigged up Bell nipple Rigged up Bell nipple (cont...) Installed BOP test plug assembly Tested BOP stack Retrieved BOP test plug assembly Installed B ore protector Progress Report Facility Pt Mac 2 Well P2-10 Rig ~ Page 2 Date 09 September 98 Date/Time 15:00-19:00 19:00-20:00 20:00-22:00 22:00-22:30 22:30-23:00 23:00-02:00 20 May 98 02:00-03:00 03:00-03:30 03:30-04:00 04:00-06:00 06:00-06:15 06:15-07:00 07:00-07:30 07:30-08:00 08:00-08:30 08:30-09:30 09:30-18:00 18:00-19:45 19:45-20:00 20:00-20:45 20:45-21:00 21:00-23:30 23:30-03:00 21 May 98 03:00-06:00 06:00-07:00 07:00-06:00 22 May 98 06:00-12:30 12:30-13:30 13:30-04:30 23 May 98 04:30-05:30 05:30-05:45 05:45-06:00 06:00-08:15 08:15-09:30 09:30-11:00 11:00-11:15 11:15-11:30 11:30-16:00 16:00-19:30 19:30-21:30 21:30-04:30 24 May 98 04:30-06:00 06:00-06:15 06:15-07:00 07:00-08:00 08:00-12:00 12:00-14:00 14:00-14:15 14:15-14:30 14:30-18:00 18:00-19:00 19:00-19:15 19:15-19:30 19:30-20:15 Duration 4 hr 1 hr 2hr 1/2hr 1/2 hr 3 hr 1 hr 1/2 hr 1/2 hr 2hr 1/4 hr 3/4 hr 1/2 hr 1/2 hr 1/2 hr lhr 8-1/2 hr 1-3/4 hr 1/4 hr 3/4 hr 1/4 hr 2-1/2 hr 3-1/2 hr 3 hr lhr 23 hr 6-1/2 hr 1 hr 15hr 1 hr 1/4 hr 1/4 hr 2-1/4 hr 1-1/4 hr 1-1/2 hr 1/4 hr 1/4 hr 4-1/2 hr 3-1/2 hr 2 hr 7 hr 1-1/2 hr 1/4 hr 3/4 hr lhr 4hr 2 hr 1/4 hr 1/4 hr 3-1/2 hr 1 hr 1/4 hr 1/4 hr 3/4 hr Activity Made up BHA no. 2 R.I.H. to 1126.0 ft Serviced Block line R.I.H. to 1974.0 ft Drilled installed equipment - DV collar R.I.H. to 5330.0 ft Circulated at 5330.0 ft Tested Casing - Via annulus and string Held drill (Kick (well kill)) Drilled cement to 5385.0 ft Drilled cement to 5424.0 ft (cont...) Drilled to 5452.0 ft Circulated at 5452.0 ft Performed formation integrity test Drilled to 5480.0 ft Rig waited · Equipment Drilled to 6274.0 ft Circulated at 6274.0 ft Circulated at 6274.0 ft Pulled out of hole to 5400.0 ft Flow check Pulled out of hole to 41.0 ft Functioned downhole tools at 41.0 ft R.I.H. to 6100.0 ft R.I.H. to 6274.0 ft (cont...) Drilled to 8596.0 ft Drilled to 9259.0 ft (cont...) Circulated at 9259.0 ft Drilled to 10250.0 ft Circulated at 10250.0 ft Flow check Circulated at 10250.0 ft Pulled out of hole to 6700.0 ft R.I.H. to 10250.0 ft Circulated at 10250.0 ft Flow check Circulated at 10250.0 ft Pulled out of hole to 214.0 ft Pulled BHA Rigged up sub-surface equipment - Formation logs Conducted electric cable operations Rigged down Logging/braided cable equipment Rigged down Logging/braided cable equipment (cont...) Removed Bore protector Made up BHA no. 3 R.I.H. to 10250.0 ft Circulated at 10250.0 ft Flow check Circulated at 10250.0 ft Pulled out of hole to 150.0 ft Pulled BHA Removed Bore protector Installed BOP test plug assembly Serviced Top ram Progress Report Facility Pt Mac 2 Well P2-10 Page 3 Rig (Om~ ~J ~ Date 09 September 98 Date/Time 20:15-21:00 21:00-22:30 22:30-23:00 23:00-06:00 25 May 98 06:00-06:15 06:15-12:00 12:00-14:00 14:00-14:15 14:15-14:45 14:45-15:00 15:00-15:30 15:30-16:00 16:00-17:00 17:00-18:00 18:00-18:15 18:15-19:00 19:00-21:30 21:30-22:30 22:30-23:30 23:30-01:00 26 May 98 01:00-01:15 01:15-06:00 06:00-06:15 06:15-16:00 16:00-17:00 17:00-18:00 18:00-18:15 18:15-20:30 20:30-20:45 20:45-01:00 27 May 98 01:00-02:30 02:30-03:00 03:00-03:30 03:30-06:00 06:00-07:00 07:00-08:00 08:00-09:00 09:00-18:00 18:00-19:00 19:00-00:30 28 May 98 00:30-03:00 03:00-06:00 06:00-13:30 13:30-15:00 15:00-15:30 15:30-16:00 16:00-03:00 29 May 98 03:00-04:00 04:00-06:00 06:00-12:00 12:00-13:00 13:00-18:00 18:00-21:00 21:00-00:00 Duration 3/4 hr 1-1/2 hr 1/2 hr 7 hr 1/4 hr 5-3/4 hr 2hr 1/4 hr 1/2 hr 1/4 hr 1/2 hr 1/2 hr lhr lhr 1/4 hr 3/4 hr 2-1/2 hr 1 hr lhr 1-1/2 hr 1/4hr 4-3/4 hr 1/4 hr 9-3/4 hr 1 hr lhr 1/4 hr 2-1/4 hr 1/4 hr 4-1/4 hr 1-1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 1 hr 1 hr lhr 9hr lhr 5-1/2 hr 2-1/2 hr 3 hr 7-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr llhr 1 hr 2 hr 6 hr 1 hr 5 hr 3 hr 3hr Activity Tested Top ram Rigged up Casing handling equipment Held safety meeting Ran Casing to 5200.0 ft (7in OD) Held safety meeting Ran Casing to..t-g-25~.0 ft (7in OD) ,/i-~), Circulated at~0 ft Held safety meeting Pumped Seawater spacers - volume 20.000 bbl Mixed and pumped slurry - 51.000 bbl Displaced slurry - 389.000 bbl Tested Casing Rigged up Casing handling equipment Installed Seal assembly Held safety meeting Worked on BOP - Top ram Rigged up Slicldine unit Conducted slickline operations on Slickline equipment - Tool run Rigged down Slickline unit Rigged up Tubing handling equipment Held safety meeting Ran Tubing to 2400.0 ft (4-1/2in OD) Held safety meeting Ran Tubing to 7525.0 ft (4-1/2in OD) Installed SCSSSV Ran Tubing to 7700.0 ft (4-1/2in OD) Held safety meeting Ran Tubing to 9650.0 ft (4-1/2in OD) Held safety meeting Laid down 2100.0 fl of Tubing Rigged down sub-surface equipment - SCSSSV Held safety meeting Retrieved SCSSSV Rig waited: Materials Rig waited: Materials (cont...) Serviced Top drive Ran Tubing to 7511.0 fl (4-1/2in OD) Laid down 3500.0 fl of Tubing Held safety meeting Laid down 4000.0 ft of Tubing Rigged up Slickline unit Conducted slickline operations on Slickline equipment - Retrival run Conducted slickline operations on Slickline equipment - Retrival run (co: Serviced Block line Rigged up Tubing handling equipment Held safety meeting Ran Tubing to 6886.0 fl (4-1/2in OD) Repaired Tubing handling equipment Ran Tubing to 4-1/2in (7735.0 ft OD) Ran Tubing to 9735.0 ft (4-1/2in OD) (cont...) Rigged down Tubing handling equipment Rigged down BOP stack Installed Xmas tree Circulated at 9735.0 fl Progress Report Facility Pt Mac 2 Well P2-10 Rig ~ Page 4 Date 09 September 98 Date/Time 30 May 98 00:00-01:00 01:00-02:00 02:00-03:00 Duration 1 hr 1 hr 1 hr Activity Tested Tubing Tested Permanent packer Freeze protect well - 60.000 bbl of Diesel Interval Feet 9850'-9870' 20 9885'-9900' 15 10000'-10030' 30 SPF Date Type Comment 4 23-Aug-98 9 1/2" Hollow Carrier. BH & DP, 84 Deg. Rope 6 24-Aug-98 3 3/8" HJII RDX 6 24-Aug-98 3 3/8" HJII RDX P2-10 is a producer. Shared Services Drilling Point Mclntrye Alaska State Plane Zone 4 Point Mclntyre Pad 2 P2-10 SURVEY REPORT 26 June, '!998 Your Reft API-500292288600 Last Survey data 24-May-98 Job# AKMMS0227 KBE- 50.13' Sl~,=r,~-sun BRILLING C~ERVIr'E5 ORIGINAL RECEivED 'JUL 01 ,'~;"~ '~" ~ ~- s C~,n~ Ccm.~ission Survey Ref: svy2379 Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl, Azim, Sub-Sea Depth (ft) Vertical Depth (ft) 377.00 0.670 150.420 326.87 377.00 404.87 0.440 158.450 354.74 404.87 494.57 0.390 153.470 444.44 494.57 583.62 0.690 150.510 533.48 583.61 675.79 0.800 202.110 625.65 675.78 766.35 1.260 216.600 716.19 766.32 855.59 0.930 197.420 805.41 855.54 946.29 0.840 179.620 896.10 946.23 1035.56 0.390 88.570 985.37 1035.50 1128.57 1.970 7.610 1078.36 1128.49 1221.84 3.550 15.040 1171.52 1221.65 1318.26 4.910 13.970 1267.67 1317.80 1416.18 5.470 14.120 1365.19 1415.32 1507.56 7.880 11.360 1455.95 1506.08 1599.44 8.280 12.860 1546.91 1597.04 1693.79 9.110 9.660 1640.18 1690.31 1787.40 9.340 9.430 1732.58 1782.71 1884.02 9.650 10.270 1827.88 1878.01 1978.83 12.200 9.100 1920.96 1971.09 2071.63 15.730 13.340 2011.00 2061.13 2166.10 17.820 17.000 2101.45 2151.58 2261.43 19.460 9.800 2191.79 2241.92 2357.11 21.850 9.240 2281.31 2331.44 2448.00 23.030 11.870 2365.32 2415.45 2543.46 24.000 10.850 2452.85 2502.98 2637.86 26.940 11.050 2538.07 2588.20 2733.47 29.820 11.480 2622.18 2672.31 2827.02 31.680 10.810 2702.58 2752.71 2922.85 33.170 9.900 2783.46 2833.59 3018.31 32.700 9.600 2863.58 2913.71 Sperry-Sun Drilling Services Survey Report for P2-10 Your Ref: API-500292288600 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 2.02 S 1.57 E 5998583.28 N 681338.20 E -1.83 2.26 S '1.69 E 5998583.04 N 681338.32 E 0.869 -2.05 2.85 S 1.95 E 5998582.45 N 681338.60 E 0.069 -2.61 3.59 S 2.35 E 5998581.73 N 681339.02 E 0.338 -3.30 4.67 S 2.38 E 5998580.65 N 681339.08 E 0.712 -4.37 6.06 S 1.55 E 5998579.24 N 681338.28 E 0.580 -5.84 7.54 S 0.75 E 5998577.74 N 681337.51 E 0.548 -7.40 8.90 S 0.53 E 5998576.37 N 681337.33 E 0.317 -8.78 9.55 S 0.84 E 5998575.73 N 681337.65 E 1.045 -9.39 7.96 S 1.37 E 5998577.34 N 681338.14 E 2.094 -7.75 3.58 S 2.33 E 5998581.74 N 681339.00 E 1.733 -3.29 3.31 N 4.10 E 5998588.67 N 681340.60 E 1.413 3.76 11.90 N 6.25 E 5998597.31 N 681342.54 E 0.572 12.54 22.27 N 8.55 E 5998607.73 N 681344.59 E 2.660 23.10 34.89 N 11.26 E 5998620.42 N 681346.99 E 0.492 35.96 48.88 N 14.03 E 5998634.47 N 681349.42 E 1.018 50.17 63.68 N 16.52 E 5998649.32 N 681351.55 E 0.249 65.16 79.38 N 19.24 E 5998665.09 N 681353.89 E 0.351 81.07 97.10 N 22.25 E 5998682.87 N 681356.46 E 2.700 99.01 119.03 N 26.70 E 5998704.90 N 681360.38 E 3.958 .121.31 145.31N 33.88 E 5998731.35 N 681366.93 E 2.478 148.25 174.92 N 40.85 E 5998761.12 N 681373.17 E 2.961 178.46 208.20 N 46.42 E 5998794.53 N 681377.94 E 2.506 212.16 242.29 N 52.80 E 5998828.76 N 681383.48 E 1.704 246.76 279.64 N 60.29 E 5998866.28 N 681390.07 E 1.102 284.72 319.49 N 68.01 E 5998906.30 N 681396.81 E 3.116 325.19 364.05 N 76.89 E 5998951.07 N 681404.61 E 3.020 370.48 410.98 N 86.13 E 5998998.21N 681412.71E 2.022 418.16 461.52 N 95.36 E 5999048.96 N 681420.71 E 1.636 469.43 512.67 N 104.15 E 5999100.31N 681428.25 E 0.521 521.25 Comment Tie-On Survey Alaska State Plane Zone 4 Point Mclntyre Pad 2 Continued... 26 June, 1998.5:43 - 2 - DrillQuest Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 3113.11 33.380 6.290 2943.06 2993.19 3206.94 33.440 5.230 3021.38 3071.51 3304.21 33.550 6.230 3102.50 3152.63 3396.70 34.220 8.530 3179.28 3229.41 3490,46 34.050 9.560 3256.89 3307.02 3588.01 32.190 8.080 3338.59 3388.72 3682.65 31.400 8.630 3419.03 3469.16 3777.27 31.000 10.110 3499.96 3550.09 3871.10 33.640 7.010 3579.26 3629.39 3966.21 32.830 5.050 3658.81 3708.94 4060.01 32.900 5.450 3737.60 3787.73 4155.53 33.400 5.790 3817.57 3867.70 4252.84 31.740 8.630 3899.58 3949.71 4348.53 31.200 8.630 3981.19 4031.32 4441.96 30.680 11.920 4061.34 4111.47 4533.43 30.050 12.080 4140.26 4190.39 4629.64 29.610 11.180 4223.72 4273.85 4720.91 30.280 10.550 4302.81 4352.94 4818.88 32.020 9.740 4386.65 4436.78 4911.56 31.680 8.620 4465.37 4515.50 5004.87 31.350 7.380 4544.92 4595.05 5100.19 30.620 8.720 4626.64 4676.77 5194.68 31.900 7.280 4707.41 4757.54 5288.51 31.390 6.750 4787.29 4837.42 5372.50 30.610 6.830 4859.28 4909.41 5467.81 29.670 5.050 4941.71 4991.84 5491.45 29.670 5.920 4962.25 5012.38 5586.66 29.100 7.420 5045.21 5095.34 5681.37 29.540 7.060 5127.79 5177.92 5778.17 30.940 5.810 5211.41 5261.54 Sperry-Sun Drilling Services Survey Report for P2-10 Your Ref: API-500292288600 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 563.85 N 111.27 E 5999151.64 N 681434.14 E 2.034 572.91 615.25 N 116.46 E 5999203.16 N 681438.07 E 0.625 624.57 668.66 N 121.82 E 5999256.68 N 681442.14 E 0.579 678.24 719.79 N 128.45 E 5999307.96 N 681447.53 E 1.564 729.79 771.75 N 136.72 E 5999360.10 N 681454.53 E 0.643 782.36 824.41 N 144.91 E 5999412.94 N 681461.44 E 2.079 835.61 873.74 N 152.15 E 5999462.44 N 681467.48 E 0.889 885.45 922.10 N 160.13 E 5999510.98 N 681474.28 E 0.914 934.41 971.70 N 167.54 E 5999560.74 N 681480.49 E 3.321 984.53 1023.53 N 173.03 E 5999612.69 N 681484.72 E 1.414 1036.64 1074.22 N 177.69 E 5999663.47 N 681488.15 E 0.243 1087.53 1126.20 N 182.80 E 5999715.56 N 681492.00 E 0.558 1139.76 1178.16 N 189.35 E 5999767.67 N 681497.28 E 2.319 1192.12 1227.55 N 196.84 E 5999817.22 N 681503.57 E 0.564 1242.05 1274.80 N 205.40 E 5999864.67 N 681510.98 E 1.894 1289.97 1320.03 N 215.01 E 5999910.12 N 681519.49 E 0.694 1336.00 1366.90 N 224.66 E 5999957.21 N 681528.00 E 0.652 1383.68 1411.64 N 233.24 E 6000002.15 N 681535.50 E 0.811 1429.11 1461.53 N 242.16 E 6000052.23 N 681543.20 E 1.827 1479.69 1509.81 N 249.97 E 6000100.69 N 681549.83 E 0.736 1528.54 1558.10 N 256.76 E 6000149.14 N 681555.45 E 0.779 1577.30 1606.69 N 263.62 E 6000197.87 N 681561.13 E 1.054 1626.36 1655.24 N 270.43 E 6000246.58 N 681566.77 E 1.568 1675.37 1704.10 N 276.45 E 6000295.57 N 681571.59 E 0.619 1724.60 1747.06 N 281.56 E 6000338.64 N 681575.66 E 0.930 1767.85 1794.65 N 286.52 E 6000386.33 N 681579.47 E 1.361 1815.70 1806.30 N 287.64 E 6000398.01 N 681580.30 E 1.822 1827.40 1852.70 N 293.06 E 6000444.52 N 681584.60 E 0.978 1874.12 1898.70 N 298.91 E 6000490.66 N 681589.32 E 0.500 1920.49 1947.15 N 304.36 E 6000539.22 N 681593.60 E 1.586 1969.24 Comment Alaska State Plane Zone 4 Point Mclntyre Pad 2 Continued... 26 June, 1998 - 5:43 - 3 - DrillQuest Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 5871.33 29.890 8.250 5291.75 5341.88 5966.12 29.960 10.490 5373.91 5424.04 6061.55 29.560 9.950 5456.75 5506.88 6154.86 29.200 9.300 5538.06 5588.19 6249.22 30.330 9.890 5619.97 5670.10 6343.12 31.360 9.810 5700.59 5750.72 6437.71 31.720 9.250 5781,21 5831.34 6531.31 31.170 8.440 5861.06 5911.19 6625.29 31.790 8.820 5941.21 5991.34 6719.31 32.260 9.920 6020.92 6071.05 6814.75 32.350 10.050 6101.59 6151.72 6908.96 32.200 9.030 6181.24 6231.37 7003.36 32.390 8.430 6261.04 6311.17 7098.61 32.690 7.340 6341.34 6391.47 7192.24 31.250 6,680 6420.77 6470.90 7287.16 31.380 5.640 6501.86 6551.99 7381.78 32.220 3,570 6582.28 6632.41 7476.97 32.250 5.160 6662.80 6712.93 7570.75 30,630 5.700 6742.81 6792.94 7664.93 29.160 6.240 6824.45 6874.58 7759.30 29.360 5.400 6906.78 6956.91 7853.97 29.630 4.560 6989.18 7039.31 7948.26 29,520 4.060 7071.19 7121.32 8042.65 29.220 3.550 7153.45 7203.58 8136.71 28.790 3.270 7235.71 7285.84 8232.54 28.510 2,890 7319,81 7369.94 8326.38 27,940 2.610 7402.49 7452.62 8422.73 27.110 3.110 7487.93 7538.06 8515.62 26.330 2,780 7570.90 7621.03 8611.02 25.620 2.290 7656.66 7706.79 Sperry-Sun Drilling Services Survey Report for P2-10 Your Ref: API-500292288600 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 1993.95 N 310.11 E 6000586.15 N 681598.22 E 1.740 2016.39 2040.60 N 317.81 E 6000632.97 N 681604.78 E 1.181 2063.61 2087.21N 326.22 E 6000679.77 N 681612.05 E 0.505 2110.89 2132.34 N 333.87 E 6000725.08 N 681618.61 E 0.515 2156.60 2178.53 N 341.69 E 6000771.44 N 681625.30 E 1.237 2203.38 2225.97 N 349.92 E 6000819.06 N 681632.38 E 1.098 2251.45 2274.76 N 358.11 E 6000868.04 N 681639.38 E 0.491 2300.86 2323.01 N 365.62 E 6000916.46 N 681645.72 E 0.741 2349.65 2371.53 N 372.99 E 6000965.14 N 681651.91 E 0.693 2398.70 2420.72 N 381.11 E 6001014.51 N 681658.83 E 0.797 2448.50 2470.95 N 389.95 E 6001064.95 N 681666.45 E 0.119 2499.41 2520.56 N 398.29 E 6001114.74 N 681673.59 E 0.600 2549.65 2570.41 N 405.95 E 6001164.77 N 681680.03 E 0.395 2600.05 2621.16 N 412.97 E 6001215.67 N 681685.82 E 0.691 2651.27 2670.36 N 419.03 E 6001265.00 N 681690.68 E 1.583 2700.84 2719.41 N 424.32 E 6001314.17 N 681694.78 E 0.586 2750.18 2769.10 N 428.31 E 6001363.94 N 681697.57 E 1.455 2800.00 2819.72 N 432.18 E 6001414.64 N 681700.20 E 0.891 2850.73 2868.42 N 436.80 E 6001463.44 N 681703.64 E 1.753 2899.63 2915.10 N 441.68 E 6001510.22 N 681707.38 E 1.587 2946.57 2960.99 N 446.35 E 6001556.21N 681710.95 E 0.484 2992.69 3007.43 N 450.40 E 6001602.73 N 681713.86 E 0.522 3039.28 3053.83 N 453.90 E 6001649.21 N 681716.23 E 0.287 3085.78 3100.02 N 456.97 E 6001695.46 N 681718.18 E 0.414 3132.02 3145.55 N 459.68 E 6001741.04 N 681719.79 E 0.479 3177.55 3191.43 N 462.15 E 6001786.96 N 681721.15 E 0.349 3223.41 3235.76 N 464.28 E 6001831.33 N 681722.20 E 0.624 3267,69 3280.23 N 466.50 E 6001875,84 N 681723,34 E 0.894 3312.12 3321.94 N 468.65 E 6001917.59 N 681724,48 E 0.855 3353.80 3363.68 N 470.50 E 6001959.37 N 681725.31 E 0.777 3395.48 Comment Alaska State Plane Zone 4 Point Mclntyre Pad 2 Continued... 26 Jun~1998.5:43 -4- DrillQuest Sperry-Sun Drilling Services Survey Report for P2-10 Your Ref: AP1-500292288600 Shared Services Drilling Point Mclntrye Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) Comment 8705.64 25.570 359.630 7742.00 7792.13 3404.54 N 471.18 E 6002000.23 N 681725.01 E 1.216 3436.15 8800.28 24.930 359.910 7827.60 7877.73 3444.91 N 471.02 E 6002040.59 N 681723.86 E 0.688 3476.23 8894.98 23.680 359.300 7913.90 7964.03 3483.89 N 470.76 E 6002079.55 N 681722.65 E 1.346 3514.92 8989.05 22.840 358.530 8000.33 8050.46 3521.03 N 470.06 E 6002116.66 N 681721.05 E 0.950 3551.73 9083.80 21.770 358.340 8087.99 8138.12 3556.98 N 469.08 E 6002152.57 N 681719.20 E 1.132 3587.33 9176.32 19.550 357.790 8174.55 8224.68 3589.60 N 467.98 E 6002185.16 N 681717.31 E 2.409 3619.61 9273.84 14.170 355.190 8267.85 8317.98 3617.82 N 466.35 E 6002213.33 N 681715.00 E 5.569 3647.45 9369.61 9.790 353.850 8361.51 8411.64 3637.60 N 464.50 E 6002233.06 N 681712.66 E 4.582 3666.89 9463.05 8.590 350.150 8453.75 8503.88 3652.38 N 462.45 E 6002247.79 N 681710.26 E 1.431 3681.33 9557.60 6.110 342.250 8547.52 8597.65 3664.13 N 459.71 E 6002259.47 N 681707.23 E 2.826 3692.69 9651,88 5.010 337.270 8641.35 8691.48 3672.71 N 456.59 E 6002267.96 N 681703.91 E 1.273 3700.85 9746.01 5.490 335.620 8735.09 8785.22 3680.60 N 453.14 E 6002275.77 N 681700.27 E 0.535 3708.29 9841.22 4.430 331.590 8829.94 8880.07 3687.98 N 449.51 E 6002283.06 N 681696.46 E 1.171 3715.21 9935.57 3.930 326.400 8924.04 8974.17 3693.88 N 445.99 E 6002288.87 N 681692.80 E 0.664 3720.66 10029.42 3.980 322.430 9017.66 9067.79 3699.14 N 442.22 E 6002294.04 N 681688.90 E 0.297 3725.45 10123.56 4.260 312.350 9111.56 9161.69 3704.08 N 437.65 E 6002298.87 N 681684.21 E 0.823 3729.84 10171.66 4.590 309.030 9159.52 9209.65 3706.50 N 434.83 E 6002301.22 N 681681.34 E 0.868 3731.91 10250.00 4.590 309.030 9237.61 9287.74 3710.45 N 429.96 E 6002305.05 N 681676.37 E 0.000 3735.28 'All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to RKB (37.00 + 11.30). Northings and Eastings are relative to Well Reference. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 6.610° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 10250.00ft., The Bottom Hole Displacement is 3735.28ft., in the Direction of 6.610° (True). Projected Survey Alaska State Plane Zone 4 Point Mclntyre Pad 2 Continued... 26 June, 1998 - 5:43 - 5 - DrillQuest Shared Services Drilling Point Mclntrye Sperry-Sun Drilling Services Survey Report for P2- I0 Your Ref: API-500292288600 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comments Measured Depth (fi) 377.00 10250.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 377.00 2.02 S 1.57 E 9287.74 3710.45 N 429.96 E Comment Tie-On Survey Projected Survey 26 June, 1998 - 5:43 - 6 - DrillQuest n I:! I LLI I~1 G S ~: I:! ~./I C ~c: 26-Jun-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re' Distribution of Survey Data for Well P2-10 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 377.0O' MD 'MD 10,250.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED JUL 0 ,N.a-:,,ka 0it &,.....~ Cms,,. . Commiss{0n. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company [:! F! I I--I--I ~ G SEFIIJICE S WELL LOG TRANSMITTAL To: State of Alaska July 1, 1998 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. )mchorage, Alaska 99501 MWD Formation Evaluation Logs P2-10, AK-MM-80227 The technical data listed below is being submitted herewith. Please address any problems or concems to the attention off Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 P2-10: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-22886-00 2"x 5" TVD Resistivity & Gamma Ray Logs: 50-029-22886-00 "") Il 511 ~ x MD Neutron & Density Logs: 50-029-22886-00 2" x 5" TVD Neutron & Density Logs: 50-029-22886-00 1 Blueline 1 Folded Sepia 1 Bluelme 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11352 Company: Alaska Oil & Gas Cons Corem Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Point Mclntyre 7/21/98 Floppy Well Job # Log Description Date BL RF Sepia Disk P 1 17 (-;t'~ - o%--t PRODUCTION LOG 980701 I 1 P 1 - 17 q~ DIGITAL FLOW ENTRY LOG 980701 I 1 P1-20 ~ ~ ~ PRODUCTION PROFILE 980421 I 1 P1-23 ~(~. I ~ q PRODUCTION PROFILE 980526 I 1 P1-23 qf DEFT LOG 980526 I 1 PM 2-09 ~ ©L,¢(..¢ CEMENT EVALUATION LOG 980611 I 1 P2-10 Ct~~· ~ RFT 980523 I 1 P 2-10 .~,-~ I CEMENT EVALUATION LOG 98061 7 I 1 P2-19 C~ . o-7Ol CEMENT EVALUATION LOG 980414 I 1 P2-37 ~ ~' IO~.~ PRODUCTION PROFILE 980504 I 1 P2-37 ~ DEFT LOG 980504 I 1 P2-44 Ci(~, ~'~ 'CEMENT EVALUATION LOG 98041 3 I 1 P2-44 ~ PRODUCTION PROFILE 98041 5 I 1 P2-44~.~ PRODUCTION PROFILE W/DEFT 98061 5 I 1 P2-45A ~'~-- I~-t PRODUCTION PROFILE 980423 I 1 P2-45A j.~ DEFT LOG 980423 DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. ~ lint I L,.L..I ~ CS WELL LOG TRANSMITTAL To: State of Alaska June 17, 1998 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Drive. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - P2-10, ,~-MM-80227 The technical data listed below is being submitted herewith.' Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' ,~ Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, )d~ 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-22886-00 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Division of Dresser Industries, Inc. TONY KNOWLE$, GOVEF~NOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: {907) 276-7542 May 11. 1998 May 12, 1998 Rcviscd Steve Shultz Drilling Engineering Supervisor ARCO Alaska. Inc. P O Box 196612 Anchorage, AK 995 i 9-6612 Re~ Pt. McIntyre P2-10 ARCO Alaska, Inc. Permit No: 98-97 Sur. Loc.: 7'NSL, 1101'EWL, Sec. 11, T12N, R14E. UM Btmhole Loc: 1588'SNL, 3715'WEL. Sec. 11, TI2N. R14E. UM Dear Mr. Shultz: Enclosed is the approved application for permit to drill thc above rcfcrcnccd well. Thc pcrmit to drill docs not excmpt you from obtaining additional permits rcquircd by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Your request for a divcrtcr variance is approved. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of thc BOPE tcst performed before drilling below the surface casing shoc must be given so that a rcprcscntative of thc Commission may witness the test. Notice may be givcn bv contacting thc Commission pctrolcum ficld inspector on the North Slope pager at 659-3607. Robert N. ChYistcnson Commissioner BY ORDER OF THE COMMISSION dlf/enclosures Department offish & Game. llabita! Section w/o cncl. Department of Environmental Conservation w/o encl. TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 May 11, 1998 Steve Shultz Drilling Engineering Supervisor ARCO Alaska, Inc. P O Box 196612 Anchorage, AK 99519-6612 Rc~ Pt. Mclntyre P2-10 ARCO Alaska, Inc. Permit No: 98-97 Sur. Loc.: 7'NSL, 1101'EWL. Sec. 11, T12N, R14E. UM Btmhole Loc: 1588'SNL, 3715"WEL, Sec. 11. T12N? R14E, UM Dear Mr. Shultz: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill docs not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations arc made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling beloxv the surface casing shoe must be given so that a representative of the Commission ma.',' witness thc test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Commissioner BY ORDER OF THE COMMISSION dlffenclosures Department of Fish & Game. Habitat Section w/o encl. Department of Environmental Consen'ation w/o encl. STATE OF ALASKA ALASKA . ,L AND GAS CONSERVATION COk ~ISSION .,._, _......~ ~.__, PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory F-] Stra~ Tes-~'-[] Development Oil [] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska Inc. Plan RTE = 49.0' Point Mclntyre 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 365548 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 7' NSL, 1101' EWL, SEC 11, T12N, R14E, UM Point Mclntyre At top of productive interval 8. Well Number Number U-630610 1601' SNL, 3710' WEL, SEC 11, T12N, R14E, UM P2-10 At total depth 9. Approximate spud date Amount $200,000.00 1588' SNL, 3715' WEL, SEC 11, T12N, R14E, UM 05/11/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 034622, 1565'I P2-09, 8.60' at 700' MD 3601.1 10380' MD / 9414' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 1050' MD Maximum Hole Angle 32° Maximum surface 3420 psig, At total depth (TVD) 8800' / 4300 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement ..... Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 133# H-40 BTC 80' 49' 49' 129' 129' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC-Mod 5376' 48' 48' 5424' 4948' 1602 sx Coldset Ill, 389 Class 'G' 8-1/2" 7" 26# L-80 BTCM 9503' 47' 47' 9537' 8571' 261 sx Class 'G' 8-1/2" 7" 29# 13CR BTCM 861' 9537' 8571' 10380' 9414' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface ., ~.:¢ Intermediate .~ .~:;:.'~.~%.i'i: ~'i_ ? Production ....... ~ Liner :.: ,-. - . ,-.?"".',-. ,. ('_.:" :' ' · ': . '. ,,~i?~;', · ' ' ..fL · -- ¢-'" ",~' ' Perforation depth: measured '""-";"::;'":¢!;i-lil;~';J"~}'?O ¢i GiN A L true vertical '?'?"?' .... 20, Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Greg Hobbs, 564-4191 Prepared By Name/Number: Caro/ W/they, 564-4114 , 21. I hereby cerbfy that the ~drf~go~ng ~s ¢l'~e and ~orrect to the best of my knowledge .... Signed st~s,~t~ ~/ ¢~%_, ~,~.~ Title Dnlhn~ En~meenn~ Supervisor Date ,_ x....~) Commission Use Only Permit Number APl Number Approval Date [ See cover letter ~'- ~' ~, 50- O 2.. ¢--- ~ :~- ~ ~' ,-.~-" ,//- ~' ~I for other requirements Conditions of Approval: Samples Required []Yes J~ No Mud Log Required []Yes [~ No Hydrogen Sulfide Measures []Yes [] No Directional Survey Required .J~Yes1~ No Required Working Pressure for BOPE 1--12M; []3M; 1~.5M; [] 10M; [] 15M Other: by order of Approved By ORIGINAL SIGNED BY Commissioner the commission Date~-~'-7 /-,,~'~ Form 10-401 Rev. 12-01-85 Robert N. Chdstenson Submit In Triplicate I Well Name: I P2-10 I I Type of Well (producer or injector): I Producer J surface Location: Target Location: Bottom Hole Location: IAFE Number: 12B0218 Estimated Start Date: 7' FSL, 1101'FWL, T 12N, R 14E, S 11 1601' FNL, 3710' FEL, T 12N, R 14E, S 11 1588' FNL, 3715' FEL, T 12N, R 14E, S 11 IMD: 1 03 0' [ I Rig: I NABORS33E 5/11/98 Days to complete 23 I TV~: 19414' I RTE: 149.0 Well Design (conventional, slimhole, etc.): Formation Markers: IUltra-Slimhole 7" Longstring, 4-1/2" 13 Cr tbg Formation Tops MD TVD Base of 1786 1783 Permafrost SV4 3976 3718 SVl (T3) 5171 4733 9 5/8" Casing 5424 4948 9-5/8" csg shoe below SV1 & above Point K-15 K15 (Ugnu) 5706 5188 West Sak 7810 7008 9.5 ppg minimum mud weight required. HRZ/K-10 (Pilot) 9876 8841 K-10/HRZ same depth. 9.6-9.9 EMW to this depth. 3% 10.0 ppg KCI GEM System at 500' ABOVE K-10. Kalubik (Pilot) 9892 8808 Kuparuk (Pilot) 9909 8871 OWC (Pilot) 10183 9117 TD (Pilot) 10323 9244 HRZ/K-10 (Core 9807 8841 140' MD Below OWC. Bore) Kalubik (Core 9822 8856 Bore) Kuparuk (Core 9837 8871 Swap out to Coring fluid (10.0 ppg) Bore) 50-100' above this point to get fluid established in the hole. WOC (Core Bore) 10083 9117 Miluveach (Core 10230 9264 10.6 PPG mud reqd. for penetration. Bore) TD (Core Bore) 10380 9414 7" casing shoe. 150' TVD below top Miluveach. Casing/Tubing Program: Hole Csg/Tbg Wt/Ft Grade Conn Length Top Btm Size O.D. MD/TVD MD/TVD 30" 20" 133# H40 BTC 80' 49/49' 129'/129' 12 1/4" 9 5/8" 40# L-80 BTC-Mod 5376' 48/48' 5424'/4948' 8 1/2" 7" 26# L-80 BTCM 9503' 47/47' 9537'/8571' 8 1/2" 7" 29# 13 Or BTCM 861' 9537'/8571' 10380'/9414' Tubing 4 1/2" 12.6# 13 Or NSTC 9704' 46'/46' 9737'/8771' Mud Program: Surface Mud Properties: Spud 112 1/4" hole section Density (ppg) FunnelVis ] Yield Point ]10 sec gel ll0 min gel] 8.7-9.5 100-300 30-70 20-60 40-80 Production Mud Properties: LSND 18 1/2" hole section Density(ppg)lFunnelVis]YieldPoint 10secgel 10mingel] 8.8-9.9 40-55 18-22 5-15 < 30 pH 9-10 Fluid Loss 15 - 25cc pH Fluid Loss 9.0-9.5 4-6cc Production Mud Properties: 3% KCL 18-1/2" hole section, GEM Density (ppg) Plastic Vis lYield Point 10 sec 110 min gel lgel 10.3-10.6 8-15 15-25 8-15 < 30 Coring Fluid: Water Base (ARCO Bland) Coring Fluid pH 9.0-9.5 Fluid Loss <5cc Cement Data: Casing First Stage: Second Stage: Comments Sxs/Wt/Yield Sxs/Wt/Yield 9-5/8" surface Coldset II1: 979/12.2/1.92 Two stage iob: casing 623/12.2/1.92 (assumes 200% First stage Coldset III lead to 5424'. excess in from 2000'-4545' @ 50% ES cementer Class G: permafrost) excess followed by Class @ at 2000' 389/15.8/1.15 G tail from shoe to 4545' MD. (750' TVD) @ 50% excess + 80' shoe. Second stage Coldset III circulated to surface. Casing/Liner Lead:Sxs/W~ield Tail:Sxs/Wt/Yield Comments 7" none 261/15.8/1.19 Class "G". Volume based on cement to 1000' above the Kuparuk with 50% excess + 80' shoe. Logging Program: I Open Hole Logs: 12 1/4" MWD/multi-shots as needed for directional survey. ICased Hole Logs: MWD/LWD GR/RES to 500' above K-10. (Pilot Hole) MWD/LWD GR/RES/DEN/NEU (Triple Combo) to TD (Pilot Hole) MWD/LWD GR to Top of Core Interval (Core Bore) Platform Express/Sonic/RFT's via E-Line to TD (Core Bore) RST Required, GR/CBT-CET (contingent on cmt job mechanics). Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. It is requested that the diverter be waived for this well. The diverter would point at Manifold buildings or other wells with the design of N-33E. There has never been any surface gas reported in any of the PM-2 drilling programs. P2-09 was just drilled 15' away with no is_su~es., , Diverter, BOPE and drilling fluid system schematics will be on file with AOGCC as soon as they are generated. Directional: KOP: 1050' MD Maximum Hole Angle: 32 degrees Close Approach Wells: P2-09 8.60' Allowable Deviation at 700' P2-12 18.36' Allowable Deviation at 995' Drillinc/and Completion Scope ]. Move rig to P2-10. NU riser and flowlines. 2. Drill 12-1/4" surface hole to - 5424' MD. 3. Run and cement 9 5/8" casing. Cement to surface. 4. RIH with 8-1/2" bit, MWD DIR/LWD Triple Combo to float collar. 5. PT casing to 3000 psi for 30 min. Record on chart. 6. Drill out 20', perform LOT. Record on chart ?. Drill 8-1/2" production hole to 500' MD above the K-10. Short Trip and swap to 10.0 PPG 3% KCI/GEM system. 8. Drill 8-1/2" production hole to 10323' MD. Analyze Logs. If interval is not swept, perform steps 18, 20 and 21. If the interval is swept prepare to plug back the pilot hole. P. Plug the pilot hole back to 9100' MD. Use 17 ppg densified cement at the top as a kick-off plug. !0. Tie on and drill the "core bore" to 100' above the Kuparuk sand with the KCL/GEM system. ! 1. Swap out to the coring fluid, drill ahead until 10' of the Kuparuk Sand is penetrated. ]2. POOH, P/U Core bbl #1. Drill 90' Core. 13. Continue step 12 with 90' Core barrels #2 and #3 until 270 total footage of core are taken. 14. POOH with final core. RIH with 8-1/2" bit and weight the core fluid up to a 10.6 ppg KCL/GEM system. ]5. Drill well to TD of 10,380' MD, 150' TVD into the Miluveach Shale. 16. Run E-Line Conveyed Platform Express, RFT's and Sonic Log. !?. Perform a Wiper Trip. !8. Run/cement 7" long string. lc). Perform a Cased Hole RST Log. 20. Run 4-1/2" L-80 tubing with 7"x4-1/2" packer, 4-1/2" SSSV, and 4-1/2"xl" GLMs. 21. Secure well, RDMO. Driilinq Haza rds/Contingeii~cies · The original reservoir pressure is 4377 psi at 8800' ss. The expected reservoir pressure is 4300 psi at 8800' ss. Abnormally pressured formations are not expected in this well. The 10.0 ppg mud will overbalance the anticipated pressure by 275 psi. · Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA bailing Gumbo problems. · Coal stringers/SV Sands in the lower Ugnu have caused stuck pipe. · No major instances of lost circulation problems have occurred on Pt Mac 2 wells. Disposal · Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough. GH O4/3O/98 ~REE: 4-1/16" ~ 5M chrome WELLH.EAD: 11" X 11" - 5M FMC Gen 5 Type 4000' : :::: :: . 9-5/8", 40¢/ft, L-80 [ 5424' [ ~ ~ ~AS LIFT MANDRELS KOP: 1050' ~ (Camco 4-1/2xl"MMG") MAX ANGLE: 32° ~ 3700' MD ~ N~ MD(BKB) TVDss ~ ::: ;:;:: 1 tbd  3 . 4-1/2" 12.~ 13 Gr ~SCT TUBING 4 TUBING ID: 3.958" :: :;;;;;::;. 5 CAPACITY: 0.01522 BBU~ 6 ,, · :: .......... ............ 7 40' MD above packer PERFORATIONRef Log: SUMMARY: Size Internal !SPF Open/Sqzd tbd .. . ..... k-80 Mod ~TC/~BGB ~SGT : 7" Packer, 9Cr . ~ 9707' 3-1/2" 'X' Nipple · ,~. ..... ~~- 3-1/2" 'XN' Nipple ~- 3-1/2" WLEG 9737' ~ 7" CHROME MARKER JOINT (20') ABOVE KUPARUK BUT BELOW 7" shoe at I a 0300' ~r[ a~V. a~ CO~UU~S Point Melnturo o4/a0/~a¢. ~m~cou~c~o~ ~1 ~O: 50-020- Sharod Sorviees Drillin~ -' YihY-01-98 FRI 12:04 Pti SPERRY-SUN hLhSKh Fh× NO, 19075835754 P, 02 Scale: ~.ch · 6oo~ Eastin~s , ? _, 4200 -- -- 4200 7" Llnar - 10322,G4 MD, 9243.62 TVD ~2-10 PH ?ARGBT- CIrde (2~' RMluO ~ 8871,30 TVD . 3930.37N, 4~0.13 E ~ ~o.~ , I , 36Q0 ' -- 3600 81oo.~ 7~oo.~ 7200.~ 3000 - -- 3000 ~00~ 6BO0.~ 2~0 - ~o.oo ~ - 2~0 / m , ~7.~5f[ TVD Z 61oo.ooIf'"' BHATandancy ~ 0.202"/100,t: 55~,7Sl[ MO, 5~800 4800 -i d~O.O0 1200 ~ .1200 [ ~" En~ DIr. Gall ~ 31.E16": 37~ 9.~6[[ MD, 3500.001[ TVD ~ F -' ~ailon Tendency ~ 1.~'11~f[: 3601.111t MD, ~00.( 0Il TVD ; 3300,~ 600 ~1 eooo.~/ ,- 600 0 ¢700.~ ~"" End ~h Sa~ e 33.~= '. 2813.79f1 MD, 2739.70~1TVD II = o 2~0.00 ~ o -- ~ ~:~' 0~¢ R~e Ih~ease ~ 1.500'11001t t 1350.001t'MD. 13~9 861( ~V0 ~:= '" KOP :Ste~ DIr 0 l ...... I I --'I -600 0 600 1200 Scale: llach m 60~ Eastings Reference is True No~h PROPOSAL TARGET SUMMARY ~ SURFACE LOCATION ~/3019B ' , ..... ....... Sperry-Sun Drilling Services Proposal Report for P2-10 (H) Wp6 Shared Services Drilling Point Mclntrye Measu red Depth Incl. Azim. Sub-Sea Depth Vertical Depth 0,00 O.OOD 0.000 -q8.30 0.00 100,00 O.OOO 0.000 51.70 1OD.OD 2Ol),00 0.000 O.OOO 15'L.70 2OD.OD 300.00 O.OOO 0.000 251.70 300.00 400.00 0.00O 0.000 351.70 400.00 500.00 0.000 O.OCO 451.70 500.00 600.00 0.000 0.0CO 551.70 600.00 700.00 0.0Q0 0.0ID0 651.70 700.00 BO0.O0 0.000 O.eL-"O 751,70 800.00 900.00 0,000 0,000 851.70 900.00 1000.00 0,000 0,000 951.70 1000.00 1050.00 O.000 0,000 1091.70 1050.00 11.00.00 0,503 10.000 1051`70 1100,00 1200.00 1,5CO 10,000 1151.68 t 199,98, '1.300.00 2.5CO 10.000 1251.62 1299,92 '[350.(~O 3.000 10.000 1301.56 1349.8,6 1400,O0 3`750 10.000 135'[.48 13,99.78 1500.00 5.250 10.000 1451.16 1499.46 1600,O0 6.750 10.000 1550.6! 1595.91 1700,00 8.250 10.000 1649.76 1699.06 1750.00 9.000 '[0.0~0 1699.19 1747.49 1786.26 9.000 10.80'0 '[735.00 1783.30 1800.00 9.000 10.009 1748.57 1796.87 16.53.79 9.000 10,000 1801.70 1.850.00 1900.00 10,155 10,000 1847.27 I895.57 2000.00 12,655 10,000 1945.28 1993.58 2100.00 15.155 10,000 2042:.35 2090.65 2200.00 17,655 10,000 2138.27 2186.57 2300.00 20.155 10.000 2232.87 2281.17 2400.00 ?.2.655 10.000 2325.96 2374,26 Local Coordinates Northings East[ngs (rt) 0.oo N O.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 F: 0.O0 N o.o0 1:: 0.00 N 0.00 E 0.00 iq o.oo E 0.00 N 0.oo E 0.00 N 0.00 E 0,g0 N 0.00 E 0.00 N 0,00 E 0.00 N 0.00 E 0.21 N 0.04 E 1.93 N 0.34 E 5.37 N 0.95 E 7.73 N 1.36 E 10.63 N 1.87 E 18.36 N 3.2_4 E 28.65 bi 5.05 E 41.5t N 7.32 E 48.89 N 8.62 E 54.48 N 9.61 E 56.59 N 9.98 E 64_88 N '[ 1.44- E 72.4.5 N 12.78 E 91.92 N 16.21 E 115.59 N 20.38 E 143.40 N 25.29 E 175.31 N 30.91 E 211.25 N 37.25 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (irt) (fi) (°/lOOft) ([1) 5958585.26 N 681336.58, E 0.00 5998,565.:26 N 681336.58 E O,0CO 0.00 5996585_26 N 681336.58 E 0,00,0 0,00 5999585.26 N 681336.58 E O,OOO O,00 59 99585.26 N 68`[ 336.58, E 0.O00 O,GO 5998565.26 N 681336.59 E O.O00 0,00 5998585.26 N 681336.59 E 0.000 0,00 5998585.26 N 681336.58 E 0.000 O,0O 5998585.26 N 681336,58; E 0.000 0.00 5998585.26 N 681336,58 E 0.000 0.00 5998585,26 N 681336,58 E 0.000 0.00 5998585,26 N 681336,58 E 0.000 0.00 5998585,4.8, N 681336.61 E 1.000 0.22 5998587.20 N 681336.87 E 1.000 1.96 5998590.65 N 681337.40 E 1.000 5.44. 5998593,0;2 N 681337.76 E 1.000 7.83 5998595.93 N 681338.2.0 E 1.500 10.77 5998603.69 N 681339.37 E 1.5(~ 18.60 5998614.03 N 681340.94. E 1.5~0 29.03 5998626.93 N 681342.89 E 1.5~0 42.65 5998634.35 N 681344-.01 E 1,5C'0 49.53 59986,2,9.95 hi 681344.86 E O.ODO 55.19 5999642.08 N 681345. t8 E 0.000 57.34 5,999650.40 N 68`[346.44 E 0.000 65.74 5998658.00 N 68'[34-7.59 E 2.500 73.41 5998677.55 N 681350.55 E 2.500 93.14 599870!.31 N 681354.15 E 2.500 117.11 5998729.23 N 681358.38 E 2.500 145.29 599876'[.27 N 681363,23 E 2.500 17'7.62. 5998797.35 N 681368.69 E 2.500 214.03 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment KOP ' Start Dir ,9 1.000°/100ft ' 1050.00{1 MO. 1050.00[1 "I-VI:;) Dir Rate Increase @ 1.500°/100~ · 1350.00ft MD, 1349.86-'¢t TVD End Dir, Salt @ 9.(K)0° - 1750.OOft MD, '[74-7.49ft TVD Base Permafrost Sial1 Dir @ 2.500°/100fl- 1853.79ft MD, 1B5O.OOB:'FVD Con finued.. . 30 April, 1998.15~2E - 1- Dr#tQuest Sperry-Sun Drilling Services Proposal Report for P2~ 10 (H) Wp6 Shared Services Drilling Point Mclntrye Measu red Depth Incl. Azim. Sub-Sea Depth (~) Vertical Depth 2500.DD 25.155 10.000 2417.37 2465.67 2600.00 27.655 1;0.000 2506.93 2555.23 2700.00 30,155 10.000 2594.47 2642.77 2500.00 :32.655 10,00~ 2679.81 2728.'[ 1 28'[ 3.79 23.000 ! 0,0 ~ 269~.40 2739.70 2900.00 33.800 10.000 2763.70 2812.00 3000.00 33.000 10. 000 2847.57 2895.87 3100.00 :3;3.C, 00 10.000 2931.44 2979.7¢ 3200,00 33.0DO 10.000 3015.30 3063.60 3300.80 33.000 10.000 3099,17 3147.47 3404).00 33.000 10.000 3183.04 3231 3500.00 33.000 10.0O0 3266.91 3315.21 3600.00 33.000 ~ 0.000 :3350.77 3399.07 3 601.11 33.000 10.0~0 3351.70 3400.0D 3700.00 32.011 10.000 3435.10 3483.40 37~9.56 31,816 1O,¢_r00 3451.70 3500.00 3800.00 :31.816 10.000 3520.06 3568.36 3900.00 31,816 10,000 3605.03 3653.33 3976.45 31.81 6 10,000 3670.00 3718.30 4000,00 31.81 6 10.000 3690.O1 3738.31 4100,6'0 31.61 6 1 O.000 3774,98 3823,28 4200,00 3I .8I 6 10.000 3859,96 3908.26 4300.00 31.816 10.000 3944.93 39:93,23 43E4.80 3~.816 '[0.000 4000.00 4048.30 4400.00 31.8 ! 6 10.0O0 4029.9l 4078.21 4.500.00 31.816 10.000 4114.88 4163.18 4600.00 311.816 lO.OD-O 4199.86 4248.16 4700.00 31.816. 10.000 4284.83 43L-qS.13 4800.00 31.816 10.000 4369.81 4418.ll 4900.00 31.1tl 6 10.000 4454.78 4503.08 Local Coordinates Northings Eastings (ft) 251.1' 5 N 44.28 E 294.94- N 52.01 E 342.54 N 6,0.40 E 393.85 N 69.45, E 401.21 N 70.74 E 447.48 N 78.90 E 501.09 N 88.36 E 554,73 N 97.8.[ E 608.37 N 107.27 E 662.00 N 116.73 E 715.64 N 126.~9 E 769.27 N 135.64 E 822.9I N 145,10 E 823.50 Id 145,21 E 875.84- N 154.43 E 886.02 N 156.23 E 927.7g N 163.59 E 979.70 N 172.75 E 1019.40 N 179.75 E 1031.62 N 181.90 E 1083.54 N 191.06 E 1135,46 N 200.2T E 1187,37 N 209.37 E 1221.02 N 215.30 E 1239.29 N 2'[ 8.52 E 1291;21 N 227.68 E 1343.13 N 236.83 E 1395.04 N 245,98 E 1445.96 N 255.14 E 1498.88 N 264.29 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fi) (fi) (°/1DOit) (fi) 5998837.41 N 6111374.76 E 2.500 254.46 5998881.38 N 681381.4l E 2.500 298.83 5998929.17 N 681388.65 E 2.500 347.06 5998980.68 N 681396.45 E 2.500 399.05 5998988.07 N 681397.57 E 2.500 406.51 5999034.50 N 681404.60 E O.0OO 453.36 5999068.35 N 68'[412.75 E O.OOO 507.70 5999142.20 N 68t420.90 E 0.000 562.04 5999196.05 N 685429.06 E 0.000 616.39 5999249.90 N 681437.21 E 0.000 670.73 5999303.75 N 681445.36 E 0.000 725.07 5999357.60 N 681453.52 E 0.000 779,42 5999411.4,5 N 681461,67 E 0.000 833.76 5999412,05 N 681461,76 E O,OOO 834,36 5999484.59 N 681489.71 E 1.000 887.39 59994,74.81 N 681471.26 E 1.000 897.70 5999516,74 N 681477,61 E 0.000 940.02 5999568.87 N 681485.50 E 0.000 992.62 5999608.72 N 681491.54 E 0.000 1032.84 5999620.99 N 681493.39 E 0.000 1045.22 5999673.12 N 681501.29 E 0.000 1097.83 5999725.24 N 681509.18 E 0.000 1150.43 5999777.37 N 68.[517.07 E 0.000 1203.03 599981t.~4- N 68t522.I8 E 0.000 1237.12 5999829.49 N 68~524`.96 E 0.00O !255.63 5999881.61 N 68~532.85 E 0.000 ~308.23 5999933.74` N 681540.75 E O.OOO t360.84 ~;999985.86 N 681548.64 E 0.04:)0 6000037.99 N 681556.53 E 0.000 1466.04 6D00090.11 N 681564,42 E 0.000 1518,64 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment End Dir, S~i[ @ 33.000° :2813.7911 MD, 2739.70ft TVD Forma, tion Tendency @ 1.000°/108ft: 360'~ .'[ '[ it MD, 3400.OOft 'TVD Er~d Dir. Sail @ 31.81 6" * 37I 9.56ft M D, 3500.00:[t I'VD SV¢ [Eslimate] Top Sluck P)pe Zone Continued.., 30 April. 1998 - 15:25 - 2- Dr#lQuest Sperry-Sun Drilling Services Proposal Report for P2-10 (H) Wp6 Shared Services Drilling Point Mclntrye Measured Depth Incl. Azim. Sub-Sea Depth (fi) Vertical Lo ca~ Coordinates Depth N orthiz~gs Eastlngs (ft) (fi) 5000.00 31.8l 6 10.000 4539,76 4588,06 5100.a0 31.816 10.000 4624.73 4673 J)3 5170.92 31.816 10.000 4685, 00 4733.30 5200.~0 31.8 ! 6 't 0.000 4709.71 4758.01 5300,O0 31.816 10.000 4794.68 48,42.98 5306,26 31.816 10.000 4800.00 4848.30 5400.00 31.816 10,O0.0 4879.66 4927.96 5423.53 31.816 10,000 4899.65 4947.95 5423.94 31.816 10,000 4900.00 4948.30 5500.00 31.816 10.000 4964.63 5012.93 5564.75 31 .$16 10.000 5019.65 5067,95 5800.00 31.764 9.907 5049,62: 5097,92. 5700.00 31; .619 9.640 5134.70 5183 5706.22 31.6.[ 0 9.623 514 O.00 5188.30, 5800.G0 31.475 9.371 5219.93 526~,23 5900.O0 31.331 9.1~0 5305.28 5.,...q...5~.56 6000.00 31.187 8.827 5390.76 5439.06 6100.00 31.045 8,552 5476.37 5524.67 6200.00 30,983 8,274 5562.11 56l 0.41' 6300.00 30.761 7. 994 564.-7.98 5696.28 64CO.00 30.620 7.7'[ 2 5733,98 5782,28 6500.00 30.480 7.427 5820.09 5868.39 6600.00 30.340 7..[40 5906,34 5954,64 6700.00 30.201 6.850 5992.70 6041 6600.00 30.062 6.558 6079.I 9 6127.49 6900.00 29.925 6.264 6165.80 6214.10 7000,O0 29.787 5.967 6252.53 6,300.83 7t00.00 29.651 5,668 6339.37 6387.67 7200.00 29.515 5.366 6426.34 6474.64 7300.00 29 .:380 5,062 6513.42 6561. .72 1550.80 N 273.45 E 1602,72 N 282.60 E 1639,54 N 289.09 E 1654,63 N 29.[.76 E 1706.55 N 300.91 E 1709.80 N 301.48 E 1758.47 N 310.07 E 1'770.68 N 3t2.22 E 1770.90 N 312.26 E 1810.39 N 319.22 E 1.844.00 N 325.15 E `[ 862.29 N 328.36 E 19t4,07 N :3.37.28 E 1917.28 N 337.152 E 1965.67 N 345.92 E 2017.10 N ,354.28 F 2068.:35 N 362.36 E 2119.44 N 370.17 E 2170.35 N 377.70 E 2.221.08 N 384.95 E 227.[.64 N 391.93 E 2322.03 N 398.62 E 2372.24 N 405,04 E 2422,27 N 411.18 E 2472.13 N 417.04 E 2521.80 N 4:22.62 E 2571.30 N 427,93 E 2620.62 N 432,95 E 2669,76 N 437.70 E 2718.72 N 442.17 E Global Coordinates Dogleg Vertical N o rthings Easti ngs Rate Secfio n (fi) (fi) (°/'~00[t) (fi) 6000142.24 N 681572.31 E 0.000 157'~.25 60001:94,36 N 681580.20 E 0.000 1623.85 6000231.:53 N 681585.80 E 0.000 1661.t6 6000246,49 N 681588.10 E 0.000 1676.45 6000298.81. N 681595.99 1: 0.000 1729.05 6000301.87 N 681596.48 E O.000 1732.34. 6,0.00350.73 N 681603.88 E 0,000 1781.66 6000363.00 N 681605,74 E 0.000 1794,03 6000363.21 N 681.605.77 E 0,~)0O 1794,25 6000402.86 N 68'[6'[1.77 E 0,OD0 1834,26 6000436.61 N 681616.88 E O.0OD 1866.31 60004.54.97 N 681619.65 E 0.2:02 1886.85 6000506.95 N 681627.31 E 0.202 1;939.28 6000510,17 N 681627,77 E 0.202 .[942.53 6000558,74 N 681634,69 E 0.202 .[99.[.51 6000610.36 N 681641,80 E 0.202 2043.54 6000661,80 N 68164-8.64 E 0.202 2095.37 6000713.06 N 681655,21 E 0.202 2147.00 6000764.13 N 6151661.50 E 0.202 2198.43 6000815.03 N 6151667.52 E 0.202 2249,65 6000865.75 N 681673.26 E 0.202 2300,67 60009.[ 6_28 N 681. 678.74 E 0,202 2.,351.48 6000966.63 N 681683.93 E 0,202 2492.09 600.[ 0 ! 6.80 N 68 ! 688.86 E 0.202 2452.49 6001066.78 N 681693.50 E 0,202 2502.69 6001116.58 N 681697.88 E 0.202 2552:.68 6001166.19 N 681701.98 E 0.202 2602.46 6001215.62 N 681705.81 E 0,202 2652.03 6001264,86 N 681709.36 E 0.202 27'01'.40 6001313.91 N 681712.64 E 0.202 2750.55 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Cerement T-3 ¢1"1-6 / SV1) Bottom S~ck Pipe Zone 9 5/8" Casing BHA Tendency @ 0,202°/100ft - 5564,75ft MD, 5057.95~t 'TVD UG4A (K-15) 30 AtTril, I99~ - 15:28 - 3 o Dd#Quest Sperry-Sun Drilling Services Proposal Report for P2-10 (H) Wp6 Shared Services Drilling Point Mclntrye Measu red Depth Incl. Azim. Sub-Sea Depth. (it) Vertical Depth (ft) 7400.00 29.246 4.755 6600.61 6648,91 7500.00 29.112 4-.445 6687,:92 6736.22 7500.00 28.97:9 4.133 6775.35 6823.65 7700.00 26. 847 3.819 6862.88 6911.1 7800.00 28.715 3,501 6950,53 6995.83 78'[ 0.80 28.701 3.4 67 6960.00 7008.30 7900.00 28.584 3.181 7038.29 7086.59 7973.43 28.489 2.945 7102.80 7I 5'[ .10 8000.~'-~ 28.454 2.859 71:26.15 8100,O0 28.325 2.533 7214.13 7262.43 8200.00 28,197 2.205 7302.21 7350.51 8,3(H3.00 28.06,9 1.874 7,390.39 7438.69 8400.00 27,942 1.541 7478.68 7526,98 8500.00 27.81 $ 1,204 7567,08 7615.38 8600.00 27.691 O. 865 7655.57 7703.87 8700.00 27.566 0.523 7744.17 7792.47 8800.00 27.443 O.178 7832.87 7881 8900.00 27.320 359.830 7921.66 7969.96 9000.¢.r0 27.198 359.480 8010.56 8058.86 9100.O0 27.077, 359.126 8099.55 814.7.85 9200.00 26.957 358.769 8188.64- 8236.94 9300.00 26.838 358.410 6277.82 8326,12 9400.00 26,719 358.048 15367.10 8415.48 9500.00 26.602 357.BB::2 8456,46 8504.76 9600.00 26.486 357.314 8545.92 8594.22 9700.00 26.370 35 6.943 8635.47 8 683.77 9800.00 28.256 356.568 8725.11 6773.41 9875.67 26.~ 70 356.283 8793.00 8841.30 9892.38 26.151; 356.220 86~/8.00 8:856.30 9900,00 26.14-2 356.191 8614.84 8863.14 Local Coordinates No]things Eastings (ft) (ft) 2767.50 N 446.35 E 2816.~ 0 N 450.26 E 2864.51 N 453.90 E 291:2.74 N 457.25 E 2:9 60.79 N 460.32 F: 2965.96; N 480.64 F_ 3008.65 N 463,12 E 3043,68 N 464.99 E 3056.33 N 465.63 E 3103,82 N 467.87 E 3151.13 N 469.8<3 E 3198.25 iN 471.51 E 3245.'[9 N 472.90 E 3291.93 N 4.74.02 E 3338.4,9 N 474..87 E 3384.86 N 4.75.43 E 343'[.04 N 475.7! E[ 3477.03 N 475.71 E 3522.83 N 475.44 £ 3568.44 N 474.88 E 3613.86 N 474.(35 E 3659.09 N 472.94 E 3704.12 N 471.54 E 3748.96 N 469.87 E 3793.61 N 467.92 E 383 B.06 iN 465.69 E 3882.31 N 463.18 E 3915.67 tq 46'[.10 E 3923.02 N 460.62 E 3926.37 N 460.40 E Globat Coordrnates Dogleg Vertical Northings Eastings Rate Sect[on (fi) (fi) (°/lOOff) (ft) 6001362.76 N 681715.64. E 0,202 :2799.50 6001411.4.5 N 681718.37 E 0,202 2848.23 6001459,94 N 681720.83 E 0~202 2896.76 600'[508.24 N 681723,01 E 0.202 2945.07 6001556,35 N 681724,92 E 0.202 2993.17 6001561.53 N 681725.11 E 0.202 2998,35 6001604,26 N 681726.55 E 0.202 304-1,05 6001639.33 N 68172.7.57 E 0.202 3076.08 6001 651..99 N 68'[727,91 E 0.20:2 3088,73 6001699.52 N 681728.99 E 0~202 3136.18 6001746.87 N 681729.80 E 0.202 3183.43 6001794..01 N 681730.33 E 0.202 3230.45 6001840.97 N 681730.59 E 0.202 3277.27 6001887.73 N 681730.58 E (3,202 3323.86 600'[934,2_.9 N 681730.29 E 0.202 3370.24 6001980,66 N 681729,73 E 0.202 3416.40 6002026,84 N 681728.89 E 0,202 3462.34 6002072.82 N 681727.78 E 0,202 3508,06 6002118.60 N 681726.39 E 0.202 3553.57 6002164.18 N 681724.73 E 0.202 3598,85 6002209.56 N 681722.79 E 0.202 3643.91 6002254.75 N . 681720.58 E 0.202 3688.75 6002.299.73 N 68171 I5.10 E 0.202 3733.37 6002344..52 N 681715.34 E 0.202 3777,77 6002389.10 N 68~712.30 E 0.202 3821 .~ 6002433.49 N 68~709.00 E 0.20'2 3865.90 6002477.67 N 685705.41 E 0.202 3909.62 6002510,97 N 681702.52 E 0.202 3942.56 6002518.31 N 681701.86 E 0.202 3949.82 6002521.65 N 681701.56 E. 0.202 3953.I3 Comment West Sak Top Colvilie [Eslfme[e] HRZ Kalubik Alaska State Plane Zone 4 Point Mclntyre Pad 2 Con.f[nued... April, 1998 - 15:26 - 4 - D~,#tQuest Sperry-Sun Drilling Services Proposal Report for P2-10 (H) Wp6 Shared Services Drilling Point Mclntrye Measured Sub-Sea Vertical Local Coordinates Global Ceord]nates Dogleg Veztical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastirtgs Rate Section (fi) (ft) (fi) Ct] (fi) (ft) (fi) ¢l~00ft) (ft) 9909.09 26,132 356.156 8823.00 887t.:30 3930.37 N 460,13 E 60D2525.04~ N 681701.19 E 0,202 3957.07 'J000O.00 :26.000 355,866 8904.66 8952,96 3970.22 N 457.35 E 6002565,41 N 681697,45 E 0,:202 3996.39 10100.00 :25.855 355,544 8994.60 9042,90 4013.82 N 454.08 E 600260&92: N 681693,12 E 0,:202 ~1039.38 1011~2.64 25.736; 355.276 9069.00 9117.30 zl049.66 N 451.2_.0 E 6002644.68; N 681689.37 E 0.202 4074.7'[ 10200.00 25.7'~1 355.220 9084,64 9132,94 ~1057.17 N 450.58 E 600265:2.17 N 61~1688,57 E 0.202 4082. i0 10300.00 25.565 354.895 9174.1~0 9223.10 4t00.28 N 446.85 E 6002B95.18 N 68;1888,79 E 0.202 4124.56 10322,64 25.532 354.822 :9195, 2.2 9243.52 4-110.01 N 445.97 E 6002704.88 N 681652,68 E 0.202 4134.13 Ail data is in [=eet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to RKB {37.00 + 11 ~30). North[rigs and Eas~ings are relative to Well Reference. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from We]] Reference and calculated along an Azimuth o! 6.193' (T~e), Based upon Minimum Curvature L'ype catculations, at a Measured Depth of 10322.64ff., The Bottom Hole Displacement is 4t34.13ft., in the Direction of 6.'[93° (True). Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment '~arge[ .; 9909.09[t MD, 887'~.30It TV'D, 681701.19 E, 6(}02525.64 N uparur~ Targel: P2-10 PH TARGET, 200.0D Radius., Geolc~.3icai WOC Total Deplh - 10322.641t MD, 9243.52fl TVD 7' [Jner 30 April, 1998 - 15'~--~ - 5 - D~'iliQL~est Sperry-Sun Drilling Services Proposal Data- P2-10- P2-10 (H) Wp6 Eastings (_=z} .. O.O:O 0.00 8.62 E 11.44 E 7C,. 74 E 145.21 E' 156.23 ~ 312.22 Do~leg A_ I, r n x~ ~z:: O.O00J O.OOO 1. OOO[ 1 - 1. 500i l_500j o. oooi 2. 500j o oooj ,A. Turn Too-face o.gooj o.0o0 o. ooo[ lO. ooo o. o0o! O.O00J VS (c6°~ (_~) O. 00~ O. 7. 49. O~ 83' 53 O.O00i O.O00 O.OOOJ 65.74 2.5001 0.000! O.OOO[ 406.Bz 0.000 0.000 O.OOC 834. 1.0001 -1.gOO O.OOOj O.OOO 0.000 O.OOO 180.00~] 89'7 36 L79~.03 325.15 0 _ O.O00J 0.000 o:~.o~j -~T~ o.~o~_I o.2o [ .._-__o_: s 0.000' O.OOO 1868. 31 460.13 E -0.319 223.79B 3957.07 45!.20 E -0.322 223.798 ~07~.71 445.97 E -0.324 223.795 ', 30 April, 1998 - 14:59 -- NAY-O1-98 FRI 12:07 PN SPERRY-SUN ALASKA FAX NO, 19075635754 P, 09 5631 Silverado Way #G Anchorage, Alaska 99518 (907) 563-3256 Fax (907) 563-7252 Shared Services Drilling Grog Hobbs Approved Well Close Approach Review P2-10 WP5 Grog, The above mentioned well has been scanned using standard anti-collision methods via DEAP, The scan was performed with the following parameters: Start Scan Inspection Zone End Senn Inspection Zone Starting Scan Radius Rate of Radius Increase (per 1000') 9,927.70' 200.00' I00.00 ~ Anti-Collision Scan summary: At the planned KOP the Starting Scan Radius is 100' larger than DEA?'s default settings of I00 ' Start Scan Radius increasing at 50' per 1000 'MD for a new-drill well scan, thus DEAP's defaults would be eqaal to 100' at the Start Scan Inspection Zone as stated above. Tl~ese numbers are used to produce a final scan radius of 1192.77' which is 596,385' larger than DEAP's default value of 596.385' I t ----. I i I . . '~t this enlarged radius the fol'[dwing wells were detected during thc scan (l~ased on closest 'Allowable Deviation f[o"'~ Plan'): Note: this list may not include all the wells detected, only those orwhich at, of concern or may effect Tolerance Line drawing! ~Lo_.m.~:ison Subject Well Plam~i Well Relati~,e Allo..w~ahl.~_~e Shut-in Required? (Sepemtion notes'l Statu.~ Well: Depth ~eperation Azimtlth Deviation a.v Texted P2-03 1600.54 'MD 106,29 ' 272.40 ° ?1,24 ' Major P2-06 494.98 'MD P2-07 1399.80 'MI) 43,47 ' P2-09 797,86 'MI3 15.61' P2-09 697.89 'M 1) 14,74' P2-09 3146,95 'MD 97.57~ P2-12 1095.~,5 'M L) 29,69 ' P2-12 995.55 'MO 2836' P2-I3 998,70 'Mr) 48.89 P2.15 799,37 'MD 70.45 P2-16 1094,70 'MD 89.63 1'2- [ 8 399,83 'M I) 121.07 P2-55 4663.89 'MD 267,94 P2-59 2615,04 'MD 106.85 60.21' 295,60 49.60 ' 269,90 * 12.77 ' 303,10" -0.72 ' 293,70" 8.57' 335,30 ° 27,20 ' 86,90 * 5.60 ' 96,90 ~ 18.36 66,20 o 2B,07 104.50 o 54,30 106.00 o 66.42 111,20 * 113,41 108,10 * 140.01 100,80 ° 40,81 Major Major Major MINOR Major Major MINOR Major Major Major Major Major Major Tolerance Plot required: YES Close Approach Comments; The above list is based on a set of criteria based on the MD of the wellplan divided by 500 times 12.5 (meaning if the report list a toleranoe line less than 12.5' away at §00'MD then that well is noted here). This results in a 375' circle at 15000'MD, given current standard target sizes this is very reasonable. Well P2-49 will need one of two things done to make it a reasonable close approach, run a very deap plug or exempt a range of the well that is close. This should be done to increase the allowable deviation in the 7500 ~ 9600 MD area to 100', if exempted. .' YIAY-O1-98 FRI 12:07 Pli SPERRY-SUN ALASKA FAX NO, 19075635754 P, 10 Close Approach Scan Performed by: Checked by: Approved by: ! .- Th~ Surface h~le '(o. 20001 close approaches are as follows P2-03', 7l .24' allowable deviation at: 1600.54' MD, (FlowinE col~dldon) P2-06: 49.6' ol]owablc devJaLion at 494,98' MI). (]:lowlng Condition) P2-07: 12,77' allowable devbt{on at 1399,B' MD, (F%wing P2-09; -0,72' ~llowah[~ d~viat~on at 797,~6' MD. (Flowbg P2-09', 8,57' allowable deviation at 697,89'MD. (Shut-in Condition) P2-12: 5.6' allowable deviation at 1095.45' MD. (Flowing condition) P2-12: 18,36' allowable deviation a~ 995.55~ MD, (Shut,in Condition) P2-13: 28,07' allowable deviation ar 998,7' MD. (Flowing condition) P2-15: 54.Y allowable deviation ~t 799,37' MD. (Flowing condition) P2-16: 66,42' allowable deviation at 1094,7' MD, (b~o~ng conditkm) P2-18:113.4I' allowable deviation ar 399,83' MD. (Flawing condition) 'The Dee'l~ hole (2o0o. TD) cios[-~ approa'~hes are as follows .... ii I --.. Ill t P2-09: 27,2' allowable deviation at 3146.95' M D. (Flowing eonditlon) P2-.58: 140.01' allowable deviation at 4663.89' MD, (Flowiag condition) Shared Services Drilling Well' P2-10 (Core) Wp4 I DriHQuest' 9550 U ::~BBSO ~)150 o I[ .-'1ie-o~. Sl'--rt [~r ~ 8.00D/lOOtt: 9'lO0.{Xlit MD, BI 4.7. E.5{i '['VD SI,EATe~clency ~ 0.344"'/100R .'~3gO.23ft U.0,8427.32~tTVD 9700~] .- Target P2-IO Core ,8871.30 TVD - 'T- Cfrcle 463.94 E Easti ngs 7" Liner- 10380.115 MD 941z~30TVD 34B0 --[ P2-10 Core TARGa-Circle ~ $871JOTVD-3671ft~N, 461.94J~ I t I 1sO 450 750 Scale: linch = $OOft 3750 3451) Re~erence rs True North Eastings PROPOSAL TARGET :SUMMARY ~2-IO cern rAl~S~ ~zaL~ ~71 .,:-o a~ao N. 4s3.~ E I SURFACE LOCATtQ N { PLOT DATE ' 4/30/98 · . .. ,.,,,,' '- O LY ~,4.~ ~ ~- ~ .... Shared Services Drilling Point Mclntrye Measured Sub-Sea Vertical Depth Incl, Az[m. Depth Depth (fi) (ft) 9100.O-3 27.077 359.126 8099.55 8147.85 9150.O0 23.355 355.676 8144.78 8193.08 9200,00 19.355 355.425 6191.34 8239.64 9300.00 11.361 354.418 8287.69 8335.99 9392.23 4.000 350.000 8379.03 8427.33 9Z100.00 3.973 349.965 8:38§.78 8435.08 9500.00 3,63 [ 349,475 84.86.56 8534.86 9600.00 3.289 348,8B3 8566.38 8634,6~ 9700.00 2,947 34 8.154 8686.23 8734,53 9800.00 2.606 347,234 8786.11 8834,41 9806.89 2.5B3 347.162 8793.00 8841.30 9821.91 2.532 347.000 8808.00 8856.30 983G,92 2.481 346.831 8823,00 8671 99 DO,OD 2.265 3zl 6.339 8886.02 893~1.32 lOO00,OD 1.922 345.332 8985,95 9034.25 0083.O9 1.639 344.176 9069.00 9'[ l 7.30 0100.00 1..581 343.987 908-5.9'[ 9-[34.21 0200.00 -[ .239 342.508 9165.88 9234.18 0230.1'3 'i.136 341.81~8 9216.00 9264.30 0300.00 0.897 ~,512 928,5.86 9334,16 0380/[ 5 0.624 337.635 9366.00 9414.30 Sperry-Sun Drilling Services Proposal Report for P2-10 (Core) Wp4 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Local Co ordinates Northings Eastings (ft) (fl) 3568.44 N 474,8B E 3589.71 N 473,96 E 3607.86 N 472.,55 E 3634.23 N 47027 E 3646.45 N 468.B3 E 36Zl 6.99 N 468.73 E 3653.51 N 467.55 E 3659.44 N 466.42 E 3664.77 N 465.34 E 3669.50 N 4.64.31 E 3669.81 N 4,64,24 E 3670.46 N 464,09 e 3671.10 N 463.9Zl E 3673.64 N zl63.33 E 3677,18 N z162.44 E 3679.67 N 461.77 E 36 80.13 N 461.64 E 3582.49 Iq 460.93 E 3663.08 N 460.74 I: 3684.26 N 460,341: 3685.25 N 459.97 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fl) (fl} (°/100fl) (fi) 6002164-,16 N 681724.73 E 3599.7B 6002185.42 N 681723.29 E 8.000 3620.78 6002203,53 N 681721.44 E 8.000 3698.61 600222.9.63 N 6817'[8.52 E 8.00,0 3664.49 6002242.02 N 681716.78 E 8.000 3676.44 60022.42.55 N 681716.67 E 0,344 3676,96, 6002249.04 N 681715,33 E 0.344 6(~02.254.94 N 681714,06 E 0.34-4- 361~9.03 co902260.24 N 6~1712,85 E 0.344- 3694.19 6002264.95 N 681711.70 E 0.344- 3698.76 6002265.25 N 681711.63 E 0.344 3699.05 6002265.90 ht 681711.46 E 0.344 3699.68 6002266.5Zl Iq 6817'[1.30 E 0,344 3700,33 6002269.06 N 681710.63 E 0.344 37(~2.74 6002272.58 N 681709.65 E 0.344 3706.15 60022.75.06 N 681708.91 E 0.344 3708.53 6002275.51 N 6B1708.77 E 0.344 3708.97 6002277.85 N 6B1708.0t E 0.344 37'[1.22 6002278.44 N 681707.81 E 0.344 3711.79 6002279,60 N 681707.38 E 0,344 3712.g0 6002280,59 N 68;706.98 E 0,344 3713,8zj Ce mment Tie-on, Start D[r @ 8,00,0v1oort: 9100,00fl, MD, 8147.85ft TVD BHATendency @ 0,34,1°/1 DOff ' 9392.23~1 MD, 8427.33ft TVD HRZ K~ubik TK~rget :. 9836.92it MD, 8871.30~t']-VD, 681711.30 E, 6002266.54 uparuK TargeL: P2-10 Core TARGET, 200.00 RaElus., Geological WOO Mi luveach T~al Depth - 10380.15ft MD, 9414.30ft TVD 7' Liner x Continued_.. Dri[iOuest 30 April, 1~8- 15:02 - I - Sperry-Sun Drilling Services Proposal Report for P2-10 (Core) Wp4 Shared Services Drilling Point Mcintrye All data is in feet unless otheR,,rise stated. Directions and coordinates are relative to True North. Vertical depths are relative to RKB (37.00 + 11.30). Northings and Eastings are relative to We[[ Reference. '1 he Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 7.114° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 10380.15ft., The Bottom Hole Displacement is 3713.84ft., in the Direction of 7.114" (True). Alaska State Plane Zone 4 Point Mclntyre Pad 2 30April, 19~8 - 15:02 -2. DriliQuest Sperry-Sun Drilling Services Proposal Data ~ P2-10 - P2-10 (Core) Wp3 I 9392['f3 2&2:23~ 4.000' 350 000 8127.33~ 234.25~3616.~5 ~468.83 E 8.000 -7.990 -2.343[ "%81.191i 3676.44 I ~ ' _~ .......... 110380.15 150 0~ ~-J62~ 337.635 941~.~j_.. 150. . ~ - i ~ .- ~ ~ ~ .... x CD .... DrillQuest ~rll, 1998- 14:58 - 1- 05/07/98 14:52 FAX 907 564 5~93 BP EXPLORATION ~001 Alaska hared ervices rilling To: Blair Wondzell From: Greg Hobbs Date: 5/6/98 Re: Point Mclntyre P2-10 Drilling Permit Per our phone conversation earlier, here is your requested memo, The P2-10 drilling permit is currently at you office for approval. It was late getting to your office due to coring issues and obtaining a consensus on these between partners. As of 2:30 p,m, today, the core has been dropped from the well entirely. This will result in the following changes to the well from the permit application: 1. All references to markers with the (Pilot) designation will not be drilled. (att. 1), 2. Coring Fluid is not needed. (att. 1) 3, The Miluveach Shale will not be penetrated. New TD is 10223' MD. (att 1). 4. 7" Longstring Depth and Logs are Modified. (att 2), 5. DrilJing and Completion Scope # 7 is modified, (att 3). 6. Drilling and completion Scope # 8-14 are deleted. (att 3). 7. Drilling and Completion Scope # 15 and 16 are modified. (att 3). 8, Drilling and Completion Scope # 19 is Deleted, (att 3). The directional schematic (att. 5) denotes the changes for the well. The target does not change, nor the completion strategy. I apologize for the abruptness of this change. I still anticipate spud of this well on Monday, 5/11/98. Your patience is appreciated. If you wish, I can clean up the attached documents and fax them to you with a "clean" wellplan that I should receive tommorrow sometime. 05/07/98 14:53 FAX 907 564 5193 BP EXPLORATION ~002 I Well Name: I P2-10 I Type of Well (producer or injector): IPr°ducer I Surface Location: 7' FSL, 1101' FWL, T 12N, R 14E, S 11 Target Location: 1601' FNL, 3710' FEL, T 12N, R 14E, S 11 Bottom Hole 1588' FNL, 3715' FEI_, T 12N, R 14E, S 11 Location: {AFE Number: 12B0218 I I Rig: I NABORS 33E lEstimatedStart ]5/11/90 ] IDays t° c°mpleteDate: I23 IMD: 110380' I IT VD= 19414' iRTE: 149-0 Design (conventional, slimhole, etc,): iUltra-Slimhole 7" Longstring, 4-1/2" 13 Cr tb.g Formation Markers: .. Formation Tops MD TVD Base of 1786 1783 Permafrost , SV4 3976 3718 , , SVl 0'.3) 5171 4733 9 5/8" Casing 5424 4948 9-5/8" csg shoe below sV1 & above Point K-15 ,,, ~K15 (Ugnu) 5706 5188 . West Sak 7810 7008 9.5 ppg minimum mud weight · _ required. H~t) 9876 8841 K-10/HRZ same depth. 9.~-~.,9.~ ~--.. to this depth. 3~g KCI GEM ~ Syst ' ABOVE K-10. ,, ~.- Kalubik. (Pilot) 9892 Kuparuk (Pilot) .. 9~ O'~c (~)L.~.~--'""~0183 9117 . ~ 10323 9244 ~-~.~_ HRZ/K-10 (Core 9807 8841 K-10/HRZ same depth. 9.6-9,9 EMW · Bore) to this depth. 3% 10.3 ppg KCI GEM System at 500' AB_OVE K-10. Kalubi'k (Core 9822 8856 Bore) .. Kuparuk (Core 9837 8871 "~ring fluid~ Bore) ~B or_~ 10083 " 9117 M i I u vea cqS-[G'OTe--- ~ ~ ~-~ ,on. TD (Core Bore) -.1-g38e- ~ 7" casing shoe. -l.6e',-RR~below-tef~ 05/07/98 14:53 FAX 907 564 5193 BP EXPLORATION ~003 Casing/Tubing Proc~ ram: Hol; Csg~/Tbg- Wt/Ft Grade ....Conn Length Top Btm Size O,D, MD/TVD MD/i'VD 30" 20" 133# H~0 BTC 80' 49/49' 12g'/129' ,, , , .... 12 1/4" 9 5/8" 40# L-80 BTC-Mod 5376' 48/48' 5424'/4948' · 8 ~" 7" 26# L-80 BTCM 9503' .. 47/47' 9537'/8571' 8 Y~" 7" 29# 13 Cr BTCM 861' 9537'/8571' 1_..0.380'/~' Tubing 4 1/2" 12,6# 13 Cr NSTC i 9704' 46'/46' 9737'/8771' ~oz z~//q z57 Mud Program: Surface Mud Properties: Spud 1 !2 1/4" hole section Density (ppg) ~FunnelVis IYie,dPo,nt I~0secge' ilominge! 8.7-9.5 ! 100-3(J0 30-70 I 20-60 40-80 "- [ Pr°ducti°n Mud Pr°perties: LSND 1 811/2" h°le sicti°n I Density (ppg) I Funnel Vis iYield Point 10 sec gel 10 min gel 8.8-9.9 I 40-55 I ~8-22 5-15 < 30 Production Mud Properties: 3% KCL 18-1/2" hole section, GEM 10.3-10.6 ' 8-15 15-25 8-15 < 30 ~VlIII~ I Ibll~l. VV4;~.,L'~i I,.,~..4~.~; ~J'-TI TV'%,,~ I--;IC311%.41 v%.,~llll%,,j I I~,~ll~,,,,I 9-10 15 - 25cc I pH Fluid Loss 9.0-9.5 4-6cc pH 9.0-9.5 i__ Fluid<.5ccLOSS Cement Data: Casing First Stag~: Second Stage: comments SxsfWt/Yield Sxs/Wt/~ield 9-5/8" surface Coldset II1: 979/12,2/i-.92 Two st~.~e'iob: casing 623/12.2/1.92 (assumes 200% First stage Coldset I!1 lead to 5424'. excess in from 2000'-4545' @ 50% ES cementer Class G' permafrost) excess followed by Class @ at 2000' 389/15.8/1.1 5 G tail from shoe to 4545' MD. (750' TVD) @ 50% excess +'80' shoe. Second stage Coldset 111 circulated to surface. Casing/Liner Lead:SxsANt/Yield Taili'Sxs/Wt/Yield Comments 7" none 261/15.8/1.1 9 Class "G". VolL~me based on cement to 1000' above ~ the Kuparuk with 50% excess + 80' shoe. - .. Logging Program: I Open Hole Logs: Cased Hole Logs: 12 1/4" MWD/multi-shots as needed for directional survey. I MWD/LWD GR/RES to 500' above K-10. (Pilct ..... MWD/LWD GR/RES/DEN/NEU (Triple Combo) to TD F'latf,;i-,~ Expi-o~,~oihi~RFT's via E-Line to TD ,,~, , ,oH, .... , GR/GBT-CET (contin.~ont on cmt lob mechanic~). 05/07/98 14:53 FAX 907 564 5193 BP EXPLORATION ~004 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. It is requested that the diverter be waived for this well. The diverter would point at Manifold buildings or other wells with the design of N-33E. There has never been any surface gas reported in any of the PM-2 drilling programs. P2-09 was just drilled 15' away with no issues. Diverter, BOPE and drilling fluid system schematics will be on file with AOGCC as soon as they are generated. Directional: KOP: Maximum Hole Angle: Close Approach Wells: 1050' MD 32 degrees P2-09 8.60' Allowable Deviation at 700' (S~) P2-12 18.36' Allowable Deviation at 995' Drillin_~ and Completion Scope ]. Mbve rig to P2-10. NU riser and flowlines. 2. Drill 12-1/4" surface hole to ~ 5424' MD. 3. Run and cement 9 5/8" casing. Cement to surface. 4. RIH with 8-1/2" bit, MWD DIR/LWD Triple Combo to float collar. 5. PT casing to 3000 psi for 30 min. Record on chart, 6. Drill out 20', perform LOT. Record on chart 7. Drill 8-1/2" production hole to 500' MD above the K-10. Short Trip and swap to ~ PPG 3% KCI/GEM ?U LVcD 'T~,lc 8-1/2" production hole to 10323' MD. Analyze Logs'. If interval is not swept, steps 21. if the interval is swept prepare to plug back the pilot hole. 9. Plug the pilot hc o 9100' MD. Use 17 ppg densified cemenl p as a kick-off plug. ]0. Tie on and drill the "core bore" to 1 sand with the KCI./GEM system. ! !. Swap out to the coring fluid, drill )aruk Sand is penetrated. ]2.. POOH, P/U Core bbl #1. D~ 13. Continue step Core .barrels #2 and fl3 until 270 total footage taken. !4. PQOH core.' RIH with 8-1/2" bit and weight the core fluid up to EM system. " to TD of 10,300' MD, I SC' TVD-into the M;luveach 16. Run E-Line Conveyed ~'-~-'-- = ~ ,~,,~,,,, ~, ~oo, R~'s.,--~,~ S0~c L~g. ]7. Pedo~ a Wiper Trip. '~' tS. Run/cement 7" long string. Z2. I ~I IVI I I I ~ ~~ I IVIV I IV I ~V~= - . 20. Run 4-1/2" L-80 tubing with 7"x4-1/2" packer, 4-1/2" SSSV, and 4-1/2"xl" GLMs..~ 2~. Secure well, RDMO. Shared S~rvices Drilling Well '. P2-?O (Core) Wp4 I DrillQuest' -- Proposal Data foil>Z-ID (COre) 7.11c eso 9G,30.00 .,. Target: 00,344tt1Dl~:O39~Z31t~O.~I,22'2~lTVD P2-10 Co. TAR{ Circle 8871.30 44~3.94 E ~H50 0 1,';0 Eastings 405O 3750 ?' Liner- 1036{3. B~ Tcr~ Q Tm-on, ,Slal ~r O' 8.0(XWIIXtff: c 3450 t'2-1o '- Ciz cle ( ;O0 'l~gns) I I~B ~ 750 ~ale: 1inch = 30~ R~erencu iS T~e No~h Eastlngs 3750, PROPOSAL TARGET SUMMARY -- l ?~?-IO C,e~ [ARGET ~:23 s. Cfl ~7l~:E?I.lO N. 4r~.cj4 E H 13 4 3 8 9 o~/~/.~ oo~.~4~I · · VENDOR ALASKAST 14 O0 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 02:1.79B CKO21798L 100. O0 100. O0 HANDL!IN~ INST' s/h kathu campoano~- x 51~ . 'HE A~ACHED CHECK IS IN PAYME~ FOR ~MS DE~RIBED ABOVE. · WELL PERMIT CHECKLIST COMPANY, _.,~--~ FIELD & POOL INIT CLASS ~_/~ WELL NAME~, ,,,¢/~,,,.,_/'~_ '"/4~5 PROGRAM: exp [] dev~ redrll [] serv [] wellbore seg El ann. disposal para reqll /'",~.,,?/ GEOL AREA ~,'~,,,'"'~ UNIT# //~'d ON/OFF SHORE ADMINISTRATION 1. Permit fee attached ....................... 2. Lease number appropriate ................... Y N 3. Unique well name and number .................. N 4. Well located in a defined pool .................. N 5. Well located proper distance from drilling unit boundary .... N 6. Well located proper distance from other wells .......... N 7. Sufficient acreage available in drilling unit ............ N 8. If deviated, is wellbore plat included ............... N 9. Operator only affected party ................... N 10. Operator has appropriate bond in force ............. N 11. Permit can be issued without conservation order ........ N 12. Permit can be issued without administrative approval ...... N 13. Can permit be approved before 15-day wait ........... N REMARKS ENGINEERING 14. Conductor string provided ................... (~N 15. Surface casing protects all known USDWs ........... ~ N 16. CMT vol adequate to circulate on conductor & surf csg ..... ~ N 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. N /) ~,~.~,~__,~~_____~ 23. If diveder required, does it meet regulations .......... N 24. Drilling fluid program schematic & equip list adequate ..... N 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to .~ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures ..... 31. Data presented on potential overpressure zones ....... 32. Seismic analysis of shallow gas zones ............. / 33. Seabed condition survey (if off-shore) ............. / Y N 34. Contact name/phone for weeklypro~ress reports ...... / Y N [exploratory only] GEOLQGY: ENGINEERING: COMMISSION: JDH~ RN~ - co Comments/Instructions: A:\GEN. Misc\FORMS\cheklist rev 09/97 dlf:C:\msoffice\wordian\diarm\checklist Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Thu Jun 11 23:53:37 1998 Reel Header Service name ............. LISTPE Date ..................... 98/06/11 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Services Library. Tape Header Service name ............. LISTPE Date ..................... 98/06/11 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Scientific Technical Technical Physical EOF Comment Record TAPE HEADER POINT McINTYRE MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT MWD RUN 2 AK-MM-80227 M. HALL K. WHITE FROM MSL 0) 72-10 500292288600 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES Il-JUN-98 MWD RUN 3 AK-MM- 80227 M. HALL K. WHITE 11 12N 14E At~k~ ~i & Gm Cons. Cornrn~fjOn KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS:' .00 50.10 11.30 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT)' 9.625 5412.0 30.000 7.000 12.250 7.000 8.500 10250.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. ALL DEPTHS ARE DRILLER'S DEPTHS AND DEPTH SHIFTING OF MWD DATA IS WAIVED AS PER THE E-MAIL MESSAGE FROM TOM WALKER ON 06/02/98. MWD IS PDC. 3. RUN 1 IS DIRECTIONAL ONLY AND NOT PRESENTED. 4. RUN 2 AND 3 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER MUELLER TUBES, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), COMPENSATED NEUTRON POROSITY (CNP), AND STABILIZED LITHO DENSITY (SLD). 5. ALL RUNS REPRESENT WELL P2-10 WITH API#: 50-029-22886-00. THIS WELL REACHED A TOTAL DEPTH OF 10250'MD, 9288'TVD, 9238'SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHA_LLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE.TIME. SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY (SANDSTONE MATRIX-FIXED HOLE SIZE) SNNA = SMOOTHED AVERAGE OF NEAR DETECTORS' COUNT RATES. SNFA = SMOOTHED AVERAGE OF FAR DETECTORS' COUNT RATES. SBDC = SMOOTHED BULK DENSITY-COMPENSATED. SCOR = SMOOTHED STANDOFF CORRECTION. SNPE = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR. ENVIRONMENTAL FILES USED FOR NUCLEAR LOG PROCESSING: HOLE SIZE: 8.5" MUD FILTRATE SALINITY: 17000 PPM. MUD WEIGHT: 10.3 PPG. FORMATION WATER SALINIT: 14545 PPM. FLUID DENSITY: 1.0 G/CC. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/06/11 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 5395.0 10215.5 FCNT 5405.5 10196.5 NCNT 5405.5 10196.5 NPHI 5405.5 10196.5 FET 5405.5 10191.0 RPD 5405.5 10191.0 RPM 5405.5 10191.0 RPS 5405.5 10191.0 RPX 5405.5 10191.0 PEF 5412.0 10206.0 DRHO 5412.0 10206.0 RHOB 5412.0 10206.0 ROP 5426.5 10250.0 $ ELINE CURVE FOR SHIFTS: BAS CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN MERGED MAIN PASS. $ BIT RUN NO MERGE TOP MERGE BASE 2 5425.0 6273.9 3 6273.9 10250.0 Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD API 4 1 68 RPX MWD OHMM 4 1 68 RPS MWD OHMS4 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 NPHI MWD' P.U, 4 1 68 ROP MWD FT/H 4 1 68 FCNT MWD CNTS 4 1 68 NCNT MWD CNTS 4 t 68 RHOB MWD G/CC 4 1 68~ DRHO MWD G/CC 4 1 68 PEF MWD BARN 4 1 68 FET MWD HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 32 9 36 10 40 11 44 12 48 13 52 14 Name Min Max Mean DEPT 5395 10250 7822.5 GR 16.4115 372.2 85.6438 RPX 0.0669 39.0715 2.97378 RPS 0.0798 2000 3.29554 RPM 0.0812 2000 3.69952 R?D 0.05 2000 4.97235 NPHI 9.2458 81.7622 39.8105 ROP 4.8047 2112.89 212.183 FCNT 406 1355 608.579 NCNT 2056 4384 2870.23 RHOB 1.2851 3.4027 2.40814 DRHO -0.197 0.8327 0.0564002 PEF 0.7087 8.4149 2.20648 FET 0.1363 94.0008 1.22554 Nsam 9711 9642 9572 9572 9572 9572 9583 9648 9583 9583 9589 9589 9589 9572 First Reading 5395 5395 5405.5 5405.5 5405.5 5405.5 5405.5 5426.5 5405.5 5405.5 5412 5412 5412 5405.5 Last Reading 10250 10215.5 10191 10191 10191 10191 10196.5 10250 10196.5 10196.5 10206 10206 10206 10191 First Reading For Entire File .......... 5395 Last Reading For Entire File ........... 10250 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/06/11 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... 'Version Number ........... 1.0.0 Date of Generation ....... 98/06/11 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 ConLment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 5395.0 6239.5 FCNT 5405.5 6220.5 NCNT 5405.5 6220.5 NPHI 5405.5 6220.5 FET 5405 . 5 6214 . 5 RPD 5405 . 5 6214 . 5 RPM 5405 . 5 6214 . 5 RPS 5405 . 5 6214 . 5 RPX 5405.5 6214.5 PEF 5412.0 6228.0 DRHO 5412.0 6228.0 RHOB 5412.0 6228.0 ROP 5426.5 6273.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAPR4A RAY EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SLD STABILIZED LITHO DEN 20-MAY-98 5.07 5.46 .MEMORY 6273.9 5425.0 6273.9 29.1 30.0 TOOL NUMBER P1010CRNLG6 P1010CRNLG6 P1010CRNLG6 P1010CRNLG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 8.500 8.5 SPUD 9.00 45.0 10.0 1200 7.8 2.000 1.701 1.900 2.100 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FET MWD 2 HOUR 4 1 68 4 2 GR MWD 2 API 4 1 68 8 3 RPX MWD 2 OHMM 4 1 68 12 4 RPS MWD 2 OHMM 4 1 68 16 5 RPM MWD 2 OHMM 4 1 68 20 6 RPD MWD 2 OHMM 4 1 68 24 7 NPHI MWD 2 P.U. 4 1 68 28 8 ROP MWD 2 FT/H 4 1 68 32 9 FCNT MWD 2 CNTS 4 1 68 36 10 NCNT MWD 2 CNTS 4 1 68 40 11 RHOB MWD 2 G/CC 4 1 68 44 12 DRHO MWD 2 G/CC 4 1 68 48 13 28.6 PEF MWD 2 BARN 4 1 68 52 14 Name Min Max Mean Nsam DEPT 5395 6273.5 5834.25 1758 FET 0.1363 94.0008 3.02293 1619 GR 16.4115 129.804 69.2264 1690 RPX 0.7775 25.5855 2.52447 1619 RPS 0.1088 2000 3.80014 1619 RPM 0.6165 2000 5.10894 1619 RPD 0.5906 2000 11.3245 1619 NPHI 19.1591 81.7622 43.2073 1631 ROP 4.8047 990.252 279.659 1695 FCNT 406 903 558.012 1631 NCNT 2056 3960 2734.1 1631 RHOB 1.2851 3.4027 2.24569 1633 DRHO -0.063 0.8327 0.0847879 1633 PEF 0.7087 7.4548 1.72555 1636 First Reading 5395 5405.5 5395 5405.5 5405.5 5405.5 5405.5 5405.5 5426.5 5405.5 5405.5 5412 5412 5412 Last Reading 6273.5 6214.5 6239.5 6214.5 6214.5 6214.5 6214.5 6220.5 6273.5 6220.5 622 0.5 6228 6228 6229.5 First Reading For Entire File .......... 5395 Last Reading For Entire File ........... 6273.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/06/11 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/06/11 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET 6215.5 RPD 6215.5 RPM 6215.5 RPS 6215.5 RPX 6215.5 FCNT 6222.5 NCNT 6222.5 NPHI 6222.5 PEF 6232.0 DRHO 6232.0 RHOB ' 6232.0 GR 6241.5 ROP 6275.5 $ LOG HEADER DATA DATE LOGGED: S O FTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON SLD STABILIZED LITHO DEN $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: STOP DEPTH 10191.0 10191.0 10191.0 10191.0 10191.0 10196.5 10196.5 10196.5 10206.0 10206.0 10206.0 10215.5 10250.0 23-MAY- 98 5.07 5.46 MEMORY 10250.0 6273.9 10250.0 3.9 32.7 TOOL NUMBER P1010CRNLG6 P1010CRNLG6 P1010CRNLG6 P1010CRNLG6 8.500 . 8.5 KCL/GEM GP 10.30 44.0 9.0 17000 4.2 .500 .261 .220 .490 57.9 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD 3 API 4 1 68 RPX MWD 3 OHMM 4 1 68 RPS MWD 3 OHMM 4 1 68 RPM MWD 3 OHMM 4 1 68 RPD MWD 3 OHMM 4 1 68 NPHI MWD 3 P.U. 4 1 68 ROP MWD 3 FT/H 4 1 68 FET MWD 3 HOUR 4 1 68 FCNT MWD 3 CNTS 4 1 68 NCNT MWD 3 CNTS 4 1 68 RHOB MWD 3 G/CC 4 1 68 DRHO MWD 3 G/CC 4 1 68 PEF MWD 3 BARN 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 32 9 36 10 40 11 44 12 48 13 52 14 Name Min Max Mean DEPT 6215.5 10250 8232.75 GR 22.9566 372.2 89.1354 RPX 0.0669 39.0715 3.06538 RPS 0.0798 47.2214 3.19299 RPM 0.0812 2000 3.41283 RPD 0.05 2000 3.67952 NPHI 9.2458 81.7622 39.1129 ROP 15.505 2112.89 197.768 FET 0.2105 13.8798 0.858751 FCNT 424.5 1355 618.96 NCNT 2176 4384 2898.21 RHOB 1.3621 3.0139 2.44163 DRHO -0.197 0.4003 0.0504313 Nsam 8070 7949 7952 7952 7952 7952 7949 7950 7952 7949 7949 7949 7949 First Reading 6215.5 6241.5 6215.5 6215.5 6215.5 6215.5 6222.5 6275.5 6215.5 6222.5 6222.5 6232 6232 Last Reading 10250 10215.5 10191 10191 10191 10191 10196.5 10250 10191 10196.5 10196.5 10206 10206 PEF 1.1811 8.4149 2.30559 7950 6231.5 10206 First Reading For Entire File .......... 6215.5 Last Reading For Entire File ........... 10250 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/06/11 MaximUm Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/06/11 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Reel Trailer Service name ............. LISTPE Date ..................... 98/06/il- Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Technical Scientific Technical Physical EOF Physical EOF End Of LIS File