Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
198-105
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU P2-14 Ext Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 198-105 50-029-22888-00-00 17017 Conductor Surface Production Liner Liner 9175 117 6728 15375 1890 16150 20" 10-3/4" 7-5/8" 4-1/2" 9045 41 - 117 39 - 6728 36 - 15375 15127 - 17017 41 - 117 39 - 4935 36 - 9007 8927 - 9175 None 2480 4790 7500 16150 5210 6890 8430 15300 - 16569 4-1/2" 12.6# 13Cr 34 - 15127 8985 - 9061 Structural 4-1/2" Baker S-3 Packer 2015, 1979 15070 8903 Bo York Operations Manager Michael Hibbert michael.hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0034624, 0365548 34 - 8927 N/A N/A 270 344 337 1187 3660 5233 1658 1875 374 343 325-237 13b. Pools active after work:Pt McIntyre Oil 4-1/2" DB-WRDP-2 SSSV 15070, 8903 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 11:58 am, Aug 05, 2025 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.08.05 11:42:50 - 08'00' Bo York (1248) JJL 8/12/25 DSR-9/10/25 RBDMS JSB 080825 ACTIVITY DATE SUMMARY 5/27/2025 ***WELL FLOWING ON ARRIVAL*** PULLED 4-1/2" WRDP FROM SVLN @ 2,015' MD DRIFTED W/ 3.50" CENT, 2-1/2" SAMPLE BAILER TO 15,118' SLM ***WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED OF STATUS*** 5/29/2025 T/I/O = 2000/1750/0. Temp = SI. T FL (ops). ALP = 1150 psi, SI @ CV. T FL @ 7600' (3310' above sta #4, SO). SV, WV, SSV = C. MV = O. IA, OA = OTG. 08:20 6/9/2025 LRS CTU #2 1.75"CT,0.156" WT, HT-110. Job Objective Mill Scale, Set Plug MIRU and function test BOP's. Make up 3-1/8" BOT milling BHA w/ 3.80" turbo scale mill. Load the well with 280 BBL's of 2% KCL and safelube. RIH and drift cleanly to the XN nipple at 15155' E / 15114' MD. POOH and swap to 3.71" turbo scale. RBIH Dry tagged at 16356' called OE he was good POOH. Breakdown Baker milling BHA set up Baker MHA and HES logging tools. RIH w/ 3-1/8" Baker MHA w/ HES 2.20" carrier, 2.30" JSN. ***Job in Progress*** 6/10/2025 LRS CTU #2 1.75"CT, 0.156" WT, HT-110. Job Objective Mill Scale, Set Plug Continue RIH with HES GR/CCL logging toolstring in 2.20" carrier with 2.30" JSN. Log from 16350' to 14500' at 50 FPM. Paint a white tie-in flag at ~ 16050'. POOH and confirm good data (-34' correction). Make up 2.70" NS setting tool and 4-1/2" CIBP. RIH and set the plug at 16150'. Good indication of set, stack 3k on the plug, and POOH. Freeze protect the tubing to 2500' TVD with diesel. Lay down the setting tool and recover 1/2" ball. RDMO. ***Job Complete*** 6/18/2025 ***WELL FLOWING ON ARRIVAL*** BRUSHED NIPPLE @ 2015' MD. SET 4 1/2" WRDP (HDS-11) ON 3.81" DB LOCK @ 2015' MD. GOOD CLOSURE TEST. ***WELL S/I ON DEPARTURE*** 7/8/2025 LRS CTU #2 1.75" CT, .156" WT HT-110 Job Objective: Ext Adperf MIRU CTU, Function Test BOPs, Make up BOT PRS Pulling Tool, L&K TBG.w/ 254 bbls of 2% KCL, Pulled WRDP from 2015'MD. *** Tag CTC against stripper 10k, Bump test H2S/LEL monitors, place in wellhouse, PT TIW/safety joint 300/4100psi.*** ***Continue on 7-9-25 WSR*** Daily Report of Well Operations PBU P2-14 Daily Report of Well Operations PBU P2-14 7/9/2025 LRS CTU #2 1.75" CT 0.156"WT HT-110 Job Objective: Ext. Ad Perf RIH w/ HES gamma/CCL in 2.90" carrier and 3.25" JSN. Clean dry drift to tag CIBP at 16185'ctm, PUH to 16165', circ in well kill 283bbls, flow check to trip tank: no flow. Log interval 16184' - 14447'. Paint white flag at 15248.14'. POOH, top fill CTBS.OOH w/ logging tools (data sent to OE and verified -28' correction). Deploy 3-1/8"x315' MaxForce 6spf, 60degree phasing 17.5gr perf guns. RIH to corrected depth. Perforate Top Shot @ 15,300', BTM Shot @ 15,615'. Circulate across the top while POOH, well on 6-8 bph losses. Retrieve spent perf guns; all guns in scallop. ***Well control drill held w/ day and night crews for taking a kick while tripping. Reviewed extended perforating standing orders*** ***Verify fit of ported XO from safety joint to perf guns, TIW in open position*** ***Continue on 7/10/25 WSR*** 7/10/2025 LRS CTU #2 1.75" CT 0.156WT HT-110 Job Objective: Ext. AdPerf Freeze protect tubing w/ 40bbls diesel. RDMO. ***Job Complete*** 7/29/2025 ***WELL S/I ON ARRIVAL*** BRUSHED BALO-O NIPPLE @ 2,015' MD SET 4-1/2" WRDP @ 2,015' MD (control & balance line integrity achieved at this point) ATTEMPTED DRAWDOWN TEST. LOOKED GOOD BUT UNABLE TO PRESSURE VALVE BACK UP WITH CONTROL LINE. PUMPING ON BALANCE LINE IT PRESSURED RIGHT UP TROUBLESHOOT CONTROL & BALANCE LINE ISSUE. NO SUCCESS PULLED 4-1/2" WRDP FROM 2,015' MD RAN 4-1/2" BRUSH & 3.80" GAUGE RING TO BALO-O NIPPLE @ 2,015' MD BRING WELL ON-LINE TO WARM UP TUBING PURGE CONTROL & BALANCE LINES (CONTROL LINE PURGES @ A HIGHER PSI, POSSIBLY JUST JUNK IN HYDRO) SET 4-1/2" DB-WRDP-2 @ 2,015' MD (ser# HHS-111, 2 sets of oversized sandwich pckg, balance port open & control line port plugged, 105" lih) ***CONTINUE 7/30/25*** 7/30/2025 ***CONTINUE FROM 7/29/25*** PERFORM CLOSURE TEST ON WRDP-2 (GOOD TEST) ***WELL TURNED OVER TO DSO*** 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU P2-14 Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 198-105 50-029-22888-00-00 ADL 0365548 17017 Conductor Surface Production Liner Liner 9175 117 6728 15375 1890 16930 20" 10-3/4" 7-5/8" 4-1/2" 9146 41 - 117 39 - 6728 36 - 15375 15127 - 17017 2920 41 - 117 39 - 4935 36 - 9007 8927 - 9175 none 2480 4790 7500 none 5210 6890 8430 15645 - 16569 4-1/2" 12.6# 13Cr 34 - 151279026 - 9061 Structural 4-1/2" Baker S-3 , 15070 , 8903 4-1/2" WRDP-2 , 2015 , 1979 Date: Bo York Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com (907) 903-5990 PRUDHOE BAY 5/1/2025 Current Pools: PT MCINTYRE OIL Proposed Pools: PT MCINTYRE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 11:18 am, Apr 17, 2025 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.04.17 07:15:20 - 08'00' Bo York (1248) 325-237 DSR-4/17/25JJL 4/18/25 Perforating gun not to exceed 500'. Reestablish pressure containment prior to perforating. Perform and document well control drill on each shift using attached standing orders. Ensure well is dead before breaking containment. , ADL0034624 SFD 10-404 SFD 4/21/2025*&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.04.21 15:11:05 -08'00'04/21/25 RBDMS JSB 042225 Page 1 of 10 Plug & Extended Perforating P2-14 PTD: 198-105 Well Name:P2-14 API Number:50-029-22888 Current Status:Operable, Online Rig:SL/EL/CTU Estimated Start Date:5/1/25 Estimated Duration:3days Reg.Approval Req’std?10-403 Date Reg. Approval Rec’vd: Regulatory Contact:Carrie Janowski 907-564-5179 First Call Engineer:Michael Hibbert 907-903-5990 Second Call Engineer:Jerry Lau 907-360-6233 Expected Rates Post Work ~.5 MMSCFD, 450 BOPD and 4000 BWPD Current Bottom Hole Pressure:3694 psi @ 8,800’ TVD 8.1 PPGE Maximum Expected BHP:3800 psi @ 8,800 TVD 8.4 PPGE Max. Anticipated Surface Pressure:2920psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:1500 psi – 10/12/19 Min ID:3.725” @ 15,114’ XN-nipple Max Angle:92° @ 15,648’ MD – 70 deg at 15,213’ MD Well History: P2-14 is a periphery well which has had significant scaling issues since drilled in 1998. This is predominantly due to high barium levels in the connate water which is what the well produces. Several scale mill outs have been executed through life, with good results on increased fluid rates but usually come with increased water cut. From 2006-2012 the well produced in LP to GC1 at an increasing WC up to ~95% and 8000bfpd. The last PPROF run in 2006 showed the majority of production coming from the perfs at 16173-16373'. In 2009 the well scaled off severely and when coil went to mill there was significant scale deposition throughout, although ROP increased significantly in the milling after passing 15915'MD (below the top two sets of perfs.) Post job, the gross fluid rate increased average 15900bfpd, pretty much all water (interesting.) The well was choked in 2011- 2012 to manage water rates and then SI when STP-36 CL to GC1 was SI. The well was POP in 2017 to test and came back online at an average of 6000bfpd and 86% WC. Initially we suspected an issue with the WC testing but upon further SO data and offset well portable well tests it appears realistic. The GFR is down >1000bfpd at similar wellhead pressure so suspect scale deposition in hole has scaled over a predominantly water zone. In 2018 we attempted to pull GLVs and install a deep GL design but were unable to clear enough scale from the tubing to set the whiddon catcher. We appeared to be hung up at an obstruction below the mandrels at 15057' which is also where the well starts to deviate, but started running into scale at 9115' with a 3.8" drift. SL was able to get a 3.25" drift to 15057' so scale deposition is not considered severe. Ultimately we could not set the whiddon we did not attempt to pull valves. The bottom dummy was installed with the completion in 1998 so we may have issues getting it out. The previous milling jobs have been tedious jobs, wearing through multiple mills due to the nature of hard barium sulfate scale. The last scale milling job in October of 2018 tagged scale at 13,823’ and milled out to the XN nipple with a 3.79” diamond parabolic mill in ~6 hours. The water samples taken from the well recently indicate the well is moving away from the scaling tendencies, but it is unknown how much scaling is in the tubing/liner. Objective:Mill scale in the tubing and liner if needed. Set a plug to isolate lower two perforation intervals. POP and test. Execute extended perforating of new interval with coiled tubing. Depending on new production rates redesign and install new gas lift design. Page 2 of 10 Plug & Extended Perforating P2-14 PTD: 198-105 Procedure Coil – order 2% KCL for FCO 1. MU motor BHA w/ ~3.80” mill. RIH and dry tag scale. Mill scale down to XN nipple. Pump gel pills as needed to clean wellbore. POOH. 2. MU ~3.70” milling BHA and cleanout 4-1/2” liner down to 16,200’ MD. Pump gel pills as needed to clean wellbore. POOH. 3. Bead-blast jewelry depending on scale encountered in the upper completion. Call and discuss with OE. 4. MU GR/CCL tools in carrier and drift and flag pipe for a plug set depth of 16,150’. a. No cased hole logs are available for this well so pull a jewelry log from tag depth (16,200’) up to GLM #8 for future wellwork. b. Use HRZ GR signature and RA tags to tie-in correlation log. 5. Send Tie-In to Michael Hibbert 6. Set CIBP@ 16,150’ MD a. Setting in 4-1/2” Liner 12.6# ID = 3.958” (will need to pass through XN nipple @ 15,114’ w/ ID = 3.725”) 7. POOH. RDMO and hand over to Operations to POP. Coil – Extended Perforating – Order 2% KCL for well kill and open-hole deployment operations 1. MU GR/CCL tools in carrier and RIH. Flag pipe for perforating from 15,300’-15,615’ MD. 2. POOH. Send correlation log to Michael Hibbert for confirmation. Use Jewelry log that was pulled on plug set steps to complete tie-in if available. Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. The well will be killed and monitored before making up the initial perf guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 3. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 4. Bullhead 1.2x wellbore volume ~286 bbls 2% KCL down tubing. Max tubing pressure 2500 psi, can go to 2750 psi to overcome SI WHP. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 238 bbls b. 4-1/2” tubing/liner – 15,645’ X .0152 bpf = 238 bbls 5.At surface, prepare for deployment of TCP guns.Ensure appropriate safety joint for gun size is on location – See communication @ end of the program w/ AOGCC 6. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 2% KCl as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 7.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review standing orders with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Page 3 of 10 Plug & Extended Perforating P2-14 PTD: 198-105 Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. c.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 8.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Perf Schedule Use 2-7/8” MaxForce Guns Perf Interval Tie In and perforate these depths Total Gun Length Weight of Gun (lbs) 15,300’-15,615’ 315’ 3909 lbs (12.41 ppf) - Estimated weigh based on 2- 7/8” guns 9. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. a. Note any tubing pressure change in WSR. 10. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface. 11. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 12. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 13. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 14. RDMO CTU. 15. Turn well over to Operations POP. Attachments: Wellbore Schematic, Proposed Schematic, Tie-In Log, BOPE and rig-up diagram, Sundry Change Form Page 4 of 10 Plug & Extended Perforating P2-14 PTD: 198-105 Current Wellbore Schematic Page 5 of 10 Plug & Extended Perforating P2-14 PTD: 198-105 Proposed Wellbore Schematic Perforate - 15,300’ – 15,615’ 16,150’ - CIBP C C Page 6 of 10 Plug & Extended Perforating P2-14 PTD: 198-105 Tie-in Log Set plug mid element @ 16,150’ Perforate 15,300’ – 15,615’ Page 7 of 10 Plug & Extended Perforating P2-14 PTD: 198-105 BOP Schematic Page 8 of 10 Plug & Extended Perforating P2-14 PTD: 198-105 Page 9 of 10 Plug & Extended Perforating P2-14 PTD: 198-105 Page 10 of 10 Plug & Extended Perforating P2-14 PTD: 198-105 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepare d By (Initials) HAK Appro ved By (Initial s) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date • • by BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 20, 2012 AUG 0 8 2[J Mr. Jim Regg Alaska Oil and Gas Conservation Commission / ©5 - 333 West 7 Avenue l Anchorage, Alaska 99501 ea. I 1 4 Subject: Corrosion Inhibitor Treatments of GPMA PM -2 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA PM -2 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • 0 BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) GPMA PM -2 Date: 04/3W2012 Corrosion Vol of cement Final top of Cement top Corrosion inhibitor/ sealant Well Name PTD # API # Initial top of cement pumped cement off date inhibitor date ft bbls ft na gal P2 -01 1970730 50029227610000 0.3 NA 0.3 NA 1.70 6/22/2009 P2 -03 1970440 50029227490000 2.0 NA 2.0 NA 10.20 6/22/2009 P2 -04 1981560 50029229070000 1.0 NA 1.0 NA 5.10 6/22/2009 P2-06 1931030 50029223880000 4.0 NA 4.0 NA 30.60 6/22/2009 P2 -07 1940580 50029224690000 2.0 NA 2.0 NA 13.60 6/22/2009 P2-08A 2061690 50029228960100 0.8 NA 0.8 NA 4.30 6/21/2009 P2 -09 1980660 50029228760000 0.3 NA 0.3 NA 0.85 6/21/2009 P2 -10 1980970 50029228860000 0.3 NA 0.3 NA 1.70 6/21/2009 P2 -11A 2060260 50029229230100 3.5 NA 3.5 NA 69.70 6/21/2009 P2 -12 1931150 50029223950000 Sealed conductor NA NA NA NA NA P2 -13 1970600 50029227570000 0.5 NA 0.5 NA 2.60 6/21/2009 ---, P2 -14 1981050 50029228880000 1.5 NA 1.5 NA 10.20 6/21/2009 P2 -15A 2070320 50029224090100 Sealed conductor NA NA NA NA NA P2 -16 1931230 50029223970000 3.0 NA 3.0 NA 28.10 6/20/2009 P2 -17 1981370 50029229020000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -18 1940600 50029224710000 0.8 NA 0.8 NA 2.60 6/20/2009 P2 -19A 2070120 50029227650100 0.3 NA 0.3 NA 0.90 6/20/2009 P2 -20 1960590 50029226640000 0.5 NA 0.5 NA 2.60 6/20/2009 P2 -21 1940530 50029224670000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -22 1972490 50029228500000 1.0 NA 1.0 NA 7.70 6/20/2009 P2 -23 1940320 50029224530000 1.3 NA 1.3 NA 11.10 6/20/2009 P2 -24 1980080 50029228540000 1.5 NA 1.5 NA 10.20 6/15/2009 P2 -25 1971110 50029227760000 1.8 NA 1.8 NA 17.90 6/10/2009 P2 -27 1971250 50029227850000 1.3 NA 1.3 NA 8.50 6/10/2009 P2 -28 1950440 50029225510000 3.3 NA 3.3 NA 37.40 4/18/2012 P2 -29 1931470 50029224070000 10.3 NA 10.3 NA 71.40 6/15/2009 P2 -30 1920950 50029222890000 2.8 NA 2.8 NA 17.90 6/10/2009 P2 -31 1940360 50029224560000 2.2 NA 2.2 NA 21.30 6/20/2009 P2 -32 1951350 50029225930000 Surface casing leak NA NA NA NA NA P2 -33B 1972310 50029228120200 2.0 NA 2.0 NA 16.60 6/9/2009 P2 -34 1950660 50029225580000 1.5 NA 1.5 NA 11.50 6/9/2009 P2-35 1951790 50029226200000 1.0 NA 1.0 NA 13.60 6/9/2009 P2 -36A 2060220 50029228010100 1.1 NA 1.1 NA 6.00 6/9/2009 P2-37A 2050570 50029225760100 2.0 NA 2.0 NA 23.00 6/9/2009 P2 -39 2111230 50029234540000 0.8 NA 0.8 NA 10.20 4/30/2012 P2 -40 1972260 50029228370000 0.5 NA 0.5 NA 5.10 6/9/2009 P2 -41 1952050 50029226330000 1.5 NA 1.5 NA 17.00 6/9/2009 P242 1931430 50029224050000 19.3 NA 19.3 NA 121.60 6/20/2009 P243 2050240 50029232500000 0.8 NA 0.8 NA 6.00 6/8/2009 P244 1960630 50029226660000 2.3 NA 2.3 NA 23.80 6/8/2009 P2-45B 2080210 50029227690200 0.8 NA 0.8 NA 5.10 6/8/2009 P246 1931320 50029224010000 2.3 NA 2.3 NA 25.50 6/8/2009 P247 1951900 50029226280000 0.0 NA 0.0 NA NA NA P2-48 1921260 50029223090000 0.2 NA 0.2 NA 1.70 4/18/2012 P249 1920240 50029222520000 2.5 NA 2.5 NA 18.70 6/7/2009 P2 -50B 1950960 50029222610200 2.0 NA 2.0 NA 23.00 6/8/2009 P2 -51 1920380 50029222620000 0.3 NA 0.3 NA 0.85 6/7/2009 P2 -52 1972010 50029228260000 3.8 NA 3.8 NA 47.60 6/7/2009 P2 -53 1960410 50029226560000 2.0 NA 2.0 NA 21.30 6/7/2009 P2 -54A 2030300 50029224700100 0.8 NA 0.8 NA 3.40 6/7/2009 P2 -55 1920820 50029222830000 4.0 NA 4.0 NA 79.90 6/22/2009 P2 -56 1951620 50029226100000 2.8 NA 2.8 NA 17.90 6/7/2009 P2 -57A 2022140 50029221830100 15.5 NA 15.5 NA 77.40 6/22/2009 P2 -58 1900080 50029220000000 Sealed conductor NA NA NA NA NA P2-59A 1982010 50029220960100 Sealed conductor NA NA NA NA NA P2-60 1910910 50029221920000 8.3 NA 8.3 NA 56.10 3/13/2012 '~ ~` STATE OF ALASKA ~ ~ ~ ALA~OIL AND GAS CONSERVATION COMC~N~ ~'~~~ '~ ~' REPORT OF SUNDRY WELL ~1P_,ERATIONS ~J~9 1. Operations Abandon ~ Repair Well Q Plug Perforations ~ imulate~ ' `" ^`~s ~ ~ MILL SCALE Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver+#-i- Tim Extension Change Approved Program ~ Operat. Shutdowrr~ Perforate ~ Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: De~lopment ~ Exploratory 198-1050 - 3. Address: P.O. Box 196612 StratlgraphlC ~ Service ~ 6. API Number: Anchorage, AK 99519-6612 50-029-22888-00-00- 7. KB Elevation (ft): 9. Well Name and Number: 46.85 KB - P2-14 - 8. Property Designation: 10. Field/Pool(s): - ADLO-365548. PRUDHOE BAY Field/ PT MCINTYRE OIL Pool 11. Present Well Condition Summary: Total Depth measured 17017 - feet Plugs (measured) None true vertical 9174.64. feet Junk (measured) None Effective Depth measured 16930 feet true vertical 9145 feet Casing Length Size MD TVD Burst Collapse Conductor 117 20" 133# H-40 41 - 117 41 - 117 Surface 6728 10-3/4"45.5# L-80 39 - 6728 39 - 4935 5210 2480 Production 15375 7-5/8" 29.7# L-80 36 - 15375 36 - 9007 6890 4790 Liner 1890 4-1/2" 12.6# 13CR 15127 - 17017 8927 - 9175 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - _ _ True Vertical depth: _ _ _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# 13CR SURFACE - 15125' 0 0 - Packers and SSSV (type and measured depth) 7-5/8"X4-1/2" BAKER S-3 15070' 0 0 0 0 0 0 12. Stimulation or cement squeeze summary: i-: r Intervals treated (measured): ~'~ty~~ - ~" ~' ~~ ~ `.t L~1v Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 0 Subsequent to operation: 190 644 2179 249 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory ~~ Development ~ ServiCe Daily Report of Well Operations X 16. Well Status after proposed work: Oil Gas WAG GINJ ~ WINJ ~ WDSPL C"` 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Namd Gary Preble Title Data Management Engineer Signature Phone 564-4944 Date 2/17/2009 Form 10-404 Revised 04/2006 a ~~ Submit Original Only P2-14 198-105 PERF OTTOCHMENT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base P2-14 7/15/98 PER 15,645. 15,733. 9,026.45 9,026.63 P2-14 7/15/98 PER 15,777. 15,865. 9,027.92 9,030.07 P2-14 7/15/98 PER 15,909. 16,129. 9,032.32 9,044.03 P2-14 7/15/98 PER 16,173. 16,393. 9,046.28 9,052.48 P2-14 7/15/98 PER 16,437. 16,569. 9,054.14 9,060.7 P2-14 10/31/99 FCO 9,000. 16,800. 5,929.15 9,101.75 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • ~~ • P2-14 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 2/3/2009 CTU #5 w/1.75" OD CT. Mill Scale. MIRU. Pump 1.25" ball for drift of new coil ~ and butt weld. Conduct weekly BOPE test. Cont' on WSR 2/04/09 ... ~.....,~n..__ ,~.~_.~.._. .~....._.~.. ___..._ - 2/4/2009, Heat up right tanks #074, 082, and 085 for CTU. Heated all tanks to 100" F ... ... _~.e.~~ ~ 2/4/2009 CTU #5 w/1.75 CT Job Scope: Mill scale from tubing and liner. «InterAct Not Publishing» RIH w. Baker 2 7/8" Extreme PDM, 3.700" Turbo Scale Mill. LRS heating fluids "'**"* Job Continued On 2/4/09 WSR **"""*" i ®. _ _ ~. 2/5/2009! CTU #5 w/1.75 CT Job Scope: Mill scale from tubing and liner. «InterAct Not ;Publishing» RIH w. Baker 2 7/8" Extreme PDM, 3.700" Turbo Scale Mill. r eta ed obstruction @ 10900' CTMD began milling process. Developed milling schedule based on recent caliper ran on 12/18/2008. Milled at an average ROP of 23 fpm 370'= 1 bbl of soils from 10900' - 13800' At 13800' indications of scale build ~up from motor work. Caliper report confirms this. Milled at average ROP of 13.5 fpm 215' = lbbl of solids from 13800' - 14175'. Slowed ROP to average of 1.0 fpm. ;Milling ahead seeing more stalls *'`*** Job continued on 2/6/09 ****** 2/6/20093 CTU #5 w/1.75 CT Job Scope: Mill scale from tubing and liner. «InterAct Not Publishing» *** Continued from 2/5/09 *"* Milling ahead seeing more stalls. POOH to check tools and trim pipe. Found cutters to be warn and under gauge. Trim pipe and MU new BHA. RIH and tag scale @ 14510' CTMD. Continue milling process @ an average ROP of 2 fpm/ 2k WOB Milling going smooth milled from 14510' to 14950' ...Job Continued on 2/7/09 ... 1 ___ 2/7/2009; CTU #5 w/1.75 CT Job Scope: Mill scale from tubing and liner. «InterAct Not Publishing» "*" Continued from 2/6/09 *** Continue milling from 14950' to 15009' ;chased gel sweeper to s/o in sta#4 Transports having problems keeping up with Ifluid requirements. Pull third transport into operation. Continued milling from 315009'- 15202' chased gel sweeper to s/o in sta #4, Continued with milling from ;15202'- 15357' with an avg. ROP of 0.6 - 1.1 fpm Applied 7k WOB attempting to get~motor toto stall. Working circulation pressure came up 700 psi from free spin with no indications of motor attempting to stall. Suspect mill is worn.- POOH Mill had worn cutters change to a piranna mill RIH with new BHA and mill. Tag at 14218' PU start milling from14000' ...Job Continued on 2/8/09 ... 2/8/2009~CTU #5 w/1.75 CT Job Scope: Mill scale from tubing and liner. «InterAct Not ~ Publishing» '""" Continued from 2/7/09 *'"'" Continue milling from 14238'-15650' ROP at end was @ 18 fph Shut off gas lift and closed wing to stabilize well in r~ P~ation for spotting acid. Spotted 11 bbls of 15% HCL down liner thru scale. With well shut in, started circulation of acid down coil and saw an immediate ~ response on the WHP Continued circulation of acid down coil looking for formation jto start taking fluids. WHP climb to 2800 psi At this point started to take returns to ;the system continuing circulation of the acid to the nozzle. Once acid was 2bbls 'from nozzle stopped taking returns and establish an injection rate of .3 bpm WHP and IAP all holding steady until all acid was pumped down the liner. Let soak for one hour. Continue milling form 15650' Milling after acid did not improve. ROP .2 • fpm decided to POOH to change BHA and look at mill. At surface break down tools. *** Job Continued on 2/9/09 """ 2/9/2009~CTU #5 w/1.75 CT Job Scope: Mill scale from tubing and liner. «InterAct Not {Publishing» *** Continued from 2/8/09 **" At surface breaking down tools trim pipe ~ MU new BHA with 3.70" Turbo Mill. Pirana mill had badly worn outer cutting ;surface. Stab onto well wait on weather -40 degrees. ****"* Job in Progress "******* 2/10/2009~CTU #5 w/1.75" CT Job Scope: Mill barium scale from tubing and liner_ End weather hold. Attempted to pressure test surface equipment to continue job and `lost the reel swivel during the process. Considering the weather forecast for tonight -5~0 below, WSL meeting tomorrow and unit over due for servicing. Decision was made to RD CTU and send to yard. ***Job Incomplete'** 2/1 CTU #5 w/1.75" CT Job Scope: Mill Scale «InterAct not Publishing» Perform 'weekly BOPE test. ...Job Continued on 2/13/09 ... _~. ~.e~~_w ..~.... ~_~ 2/13/2009 CTU #5 w/1.75" CT Job Scope: Mill Scale «InterAct not Publishing» Perform weekly BOPS test. RIH 2 7/8" Extreme PDM w/ 3.70" Turbo Mill. Tag scale @ 15657' ctmd. Continue milling process to 15749' ctmd. Mill appeare o e warn after several attempts to get it to continue milling. POOH and check bit ...Job in progress 1 LJ 2/14/2009 CTU #5 w/1.75" CT Job Scope Mill Scale «InterAct not publishing» Repair load cell on CT injector on surface. Inspected cutters on previously ran Turbo cutters [slightly warn and under gauge. Not as bad as previous mills ran. RIH 2 7/8" !Extreme PDM w/ redressed 3.70" Turbo Mill. Tag and start milling ~ 15745' - 15883' and still milling. Milled to 15897 ROP still declining POOH to check mill and BHA. ...Job Continued on 2/15/09 2/15/2009 CTU #5 w/1.75" CT Job Scope: Mill Scale «InterAct not publishing» POOH to look at BHA and Mill. OOH Mill showing wear on leading edge and face of mill. Center of mill has a 1.2" OD area showing no signs of wear. Conducted pipe management while on surface. RIH w/ 3.70" Turbo Mill w/ Gen II buttons added to leading edge of mill. Tagged at 15,897' ctmd and continued milling ahead at 23 fph At 15,915' ctmd ROP picked up to 80 fph giving an indication that we had broken thru just at the top of the third pert interval. Continued milling with an ROP of 80 .,fph then at 16133' ROP picked up to 300' fph. May be in soft scale slowed down a jbit and stopped at 16,300' Chased gell sweep back to the s/o in GLM #4 @ 10,910' j MD Ran back in hole while completing a bottoms up. Shut down pump @ 16225' ~ctmd and drifted liner 100' be and tar et depth to 16,700' POOH back reaming hole to surface Shut. Notified DSO o well status and that it needed to be put in test. Also passed along that the OA was increasing and that we would bleed down Ito 300 psi before leaving. RDMO *""Job Complete"** FLUIDS PUMPED BBLS 4535 Slick 1 %KCL 127 Geovis 227 60/40 Meth 270 XS 1 % KCL w/0.6% SafeLube 3306 XS 1 %KCL 11 15% HCC Acid 8476 Total 01/25/2007 Schlumbel'ger NO. 4125 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 IC~15 -/oS- Field: Prudhoe Bay WII J b# L D BL CI CD D t e 0 og escrlptlon ae o or P2-37A 11491392 MEM PROD PROFILE 11/15/06 1 Y-23B 11418299 MEM PROD PROFILE 09/06/06 1 NK-07A 11588698 MEM GLS 12/21/06 1 07-01A 11555031 GAS ENTRY SURVEY 12/19/06 1 NK-08A 11485780 MEM GLS 12/20/06 1 NK-27 11588699 MEM GLS 12/22/06 1 NK-43 11513659 PRODUCTION PROFILE 12/22/06 1 DS 09-32 11555530 INJECTION PROFILE 12/16/06 1 P2-14 11539745 MEM PROD PROFILE 12/07/06 1 Y-05A 11539744 MEM INJECTION PROFILE 12/06/06 1 S-02Ä 11285936 MEM PROD PROFILE 08/17/06 1 12-32 11536184 USIT 12/05/06 1 MPS-10A 11486087 COMPOSITE WFLlLDL 12/14/06 1 Z-19A 11226013 SCMT 1 0/28/06 1 Y-30L1 11588700 MEM PROD PROFILE 12/23/06 1 E-11 B 11434757 DSI 10/24/06 1 E-11B 11434760 DSI 10/29/06 1 E·11 B 11434760 FMI 10/29/06 1 G-14A 11485777 MEM PROD PROFILE 11/27/06 1 G-14A 11485777 SCMT 11/27/06 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING ~,Ri'i.WWlUÄG 9t1'i,COPY E~ÇH..IP: BP Exploration (Alaska) Inc. ~ JAN 3 0 lUUI petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Date Delivered: Received by: (Ì\ . . Well c°mPlian 'e Report File on Left side of folder 198-105-0 MD 17017 ' TVD09174" Microfilm Roll / - POINT MCINTYRE P2-14 50- 029-22888-00 BP EXPLORATION (ALASK A \ l~%.lf" Completion Dat 5/98 Completed Status: 1-OIL Current: Roll 2 / Name D 8729 D 8766 D 8779 DGR/CNP/SLD-MD L DGR/CNP/SLD-TVD L DGR/EWR4-MD L DGR/EWR4-MD L DGR/EWR4-TVD L DGR/EWR4-TVD L GR/CCL R SRVY RPT Interval ~"~ SCHLUM CBT PB1 CH .~'"'"'~S PERRY MPT/GR/EWR4 OH ~ SPERRY MPT/GR/EWR4/CNP/SLD OH F~L 6727-16194 PB1 {,o/~S~z ~ ~ H ~'flq'-~L 4888-9143 PB1 / OH t~NAL 6727-16194 PB, ~' OH b,o~l 6727-16999 ~/~/~'-', ~/10~ OH ~"~aL 4888-9143 PB1 ~'['S~ ~ /'°~O~' OH ~;.~11 4888-9174 C. Yf~.~L 12870-15868 PB1 ~o[Zl/Off~ CH ~qS't~RRY 13800-17017. OH Sent Received T/C/D 9/22/98 9/24/98 10/21/98 10/28/98 10/14/98 10/14/98 10/21/98 10/22/98 10/21/98 10/22/98 10/21/98 10/22/98 10/28/98 10/28/98 10/21/98 10/22/98 10/28/98 10/28/98 5 9/22/98 9/24/98 D 8/19/98 8/26/98 R SRVY RPT ~RRY 1000-16207. PB1 OH 8/19/98 8/26/98 Daily Well Ops ¢~')-- ~¢~Td~ Are Dry Ditch Samples Required? yes And Received?~' Was the well cored? yes ~_~. Analysis Description Re~ SampleSet # Comments: Tuesday, August 01, 2000 Page 1 of 1 k.~. Stat, .~FAlaska ..,, ,?,., .... Oil and Gas Conservation Commission - .... . 3001 Porcupine'Drive ..: Anchorage AK 99501-3.1.92 The AOGCC releases' ~°nfidential data' to authorized employees.of the Division of Oil and Gas (DNR/DOG), Blueline logs and copied, reports are inventoried by prior to release. These confidential data are then responsibility of the undersigned DNPJDOG employee. · Print Name. ~"~or~ ,~¢0~5'~c)r~ signature ~:::),¢"--- ,~J_/.~. Date " r~¢l~,~-~,-~. ~P~- I~{ ~/ PTD #.I0~S - 1o. 5' WELL NAME :. ii ...... " Description. Anai'ysiS ,~ 403 CORE Conventional SWC ~ Production TeSts PICKS Formation Picks or DSTs Geological, Mark ers .... ~.~ ~o.r....? ~,.,~ . . ,,,',,',,:,:, .,,, '" ~ "- " ~ ~. ~ ....... ~ ~ . ~o~'~, · · ...... ¢ ....... ', ,,,: .... b'~ ,,,,,', ..... ',,',;,L~,' .... ~, : ' , ........ ' ' ' ....... ' .... . '"';" "~" ..... " I ' '* '"' '~" ": ' " ...... BLUE Li'NE 'i'Jl RuN JJ INTERVAL JJ SCALE!::'JJ NOTE ,u,,.o,.. ...........,......... .. ¢>, . '. ..... ,, , ' . ' ??1'. ...'.,.. .,.. . ..... . ............. ., ,..,.... -,- rev 08/03/95 confidnr, doc , , State of Alaska Oil and Gas Conservation Commission , 3001 Porcupine Drive ' " Anchorage AK 99501-3192 The AOGCC releases confidential data to authorized employees of the Division of Oil and Gas (DNR/DOG). Blueline logs and copied, reports are inventoried by Prior to release. Th8se confidential data are then responsibility of the undersigned 'DNR/DOG employee. PAGE TWO IF NEEDED ., PTD # ]c~,g _ ~0 ~ WELL NAME ""~? I'~e't~,l~e. ?'~- - I ~ ¸il rev 08/03/95-,confidnr. doc rn F! I I_L..I ~ CS S E FIL/I I" E S WELL LOG TRANSMITrAL To: State of Alaska October 28, 1998 Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs P2-14 , AK-MM-80246 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518 P2-14: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-22888-00 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-029-22888-00 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia OCT £8 1998 Oil & G~ Cons. ~mmi~ion Anchorage 5631 Silverado Way, Suite G .Anchorage, Alaska 99518 · (907) 273-3500. Fax (907) 273-3535 13 !::! I I--I_ I N 13 To: State of Alaska October 21, 1998 Alaska Oil and Gas Conservation Corran. Atm.: Loft Taylor 3001 Porcupine Drive. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs - P2-14, AK-MM-80246 The technical data listed below is being submitted herewith. Please acknowledge receipt by remming a signed copy of this transmittal letter to the attention off Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. APl#: 50-029-22888-00 5631 8ilverado Way, ,..quite G · Anchoraoe, Alaska 99516 · (907) 273-3500 · Fax (907) 273-3535 D !::1 I L-I-- I I~i I~ WELL LOG TRANSMITrAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atm.- Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 October 21, 1998 RE: MWD Formation Evaluation Logs P2-14PB1, AK-MM-80246 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 , ,P2-14 PB!:, 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-22888--70 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-029-22888-70 2"x 5" MD Neutron & Density Logs: 50-029-22888-70 2"x 5" MD Neutron & Density Logs: 50-029-22888-70 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia _ . OCT 22 1998 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrle NO. 11548~ Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Greater Point Mclntyre Area 1 0/8/98 Floppy Well Job # Log Description Date BL RF Sepia Disk * REPLACEMENT FLOPPY *- THE DATA oRIGINAL'I'Y PRESENTED IN FILE #1 (EDITED FILE)INCoRREcTLY INDICATES TI~ AT ., , THE DATA WAS ACQUIRED WITH A CNTD TOOL. THE DATA WAS ACTUALLY ACQUIRED WITH A GAMMA RAY TOOL W/COLLAR LOCATOR. THE DATA IN FILE #1 NOW ACTUALLY REFLECTS THE TOOLS USED TO ACQUIRE THE DATA: GR AND CCL. AESOp AS PER CATHERINE WORLEYP THIS DATA WAS ACQUIRED IN THE ORIGINAL WELL BORE INSIDE DRIL.L pIPE ON P2-14. PB1 BEFORE IT WAS PLUGGED B.A, CK FOR DRILLING OF THE SIDETRACK WELL P2-14. THERE.FO.,REp THE WELL NAME AND APl# ARE: p2-14PB1 #50-029-22888-70. ,, // SIGNED: DATE: OCT 1 5 ~998 Please sign and return one copy of this transmittal to Sherrle at the above ad~ank you. Anchorage To: State of Alaska October 14, 1998 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Drive. ~ Anchorage, Alaska 99501 ~~' / ~) ~ MWD Formation Evaluation Logs - P2-14 PB 1, RE: AK-MM-80246 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, ~3, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API~: 50-029-22888-70 OCT 14 1998 Alaska 0il & Gas Cons. Commm~ An~or~je 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500. Fax (907) 273-3535 A Dresser Indu_qtri~_q Inn (~.t-,mn~anv GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11500 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Lisburne Floppy Color Well Job # Log Description Date BL RF Sepia Disk Print P2-14PBlC~ ~c>,~ 98469 PDCGR/CCL '980621 I 1 1 P2-17 -j~ ~/r,~ 98470 CET/CBT ~C 980819 I I 1 I p2-19 " PRODi~CTiON PROFILE 98 ~ 709 I I ..... Ip2-.19 ...... PRODUCT~01~ 'PROFILE DEFI' IMAGEs 980709 I I " , , P2-27 PRODUCTION PROFILE W/DEFT 980817 1 1 ,,,, , ,, , , , ,,, .... ..... SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. DATE: " STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [~ Gas [] Suspended I--] Abandoned [] Service 2. Name of Operator 7. Permit Number ARCO Alaska Inc. 98-105 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029°22888 4. Location of well at surface ~ ........... ~r- 9. Unit or Lease Name 16' SNL, 1157' EWL, SEC. 14, T12N, R14E, UM i -'.'.;:.:,.~ '.,~;: ,-, ;~it Point Mclntyre At top of productive interval :~ ~'~ '',? ': 10. Well Number 3133' NSL, 3392' EWL, SEC. 1, T12N, R14E, UM i - '--~-~,~/~; P2-14 Attotal depth i ..... ~.~__! ~ ~;~ 11. Field and Pool 4691' NSL, 4018' EWL, SEC. 1, T12N, R14, UM :- .................. '"¢; Point Mclntyre 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 46.85'I ADL365548 12. Date Spudded I 13. Date I.D. Reached I 14. Date Comp., Susp., or Aband.[15. water depth, if offshore 116. No. of Completions 5/30/98 7/9/98 07/15/98 (Completed) I N/A MSLI One 17. Total Depth (MD+TVD)17017 9174 FT,]I 8' Plug Back Depth (MD+TVD)]I 9' Directi°nal Survey 120' Depth where SSSV set 121' Thickness °f Permafr°st16930 9145 Fi, [~Yes F-]No 2015 MD 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, Gyro, GR/RES 23. CASING7 LINER AND CEMENTING RECORD CASING SE-I-rING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 133# H-40 41' 117' 30" 260 sx Arctic Set (Approx.) 10-3/4" 45.5# L-80 39' 6728' 13-1/2" 1773 sx Coldset III, 820 sx Class 'G' 7-5/8" 29.7# L-80 36' 15375' 9-5/8" !300 sx Class 'G' 4-1/2" 12.6# 13CR 15127' 17017' 6-3/4" 299 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-3/4" Gun Diameter, 4spf 4-1/2", 12/6#, 13CR 15126' 15070' MD TVD MD TVD 15645'-15733' 9025' - 9026' 15777'-15865' 9027' - 9029' 26. ACID, FRACTURE, CEMENT SQUEEZE. ETC. 15909'-16129' 9031' - 9043' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 16173'-16393' 9045' - 9052' 16437'-16569' 9053' - 9060' 15365' - 16207' Kick off Plug #1, 100 bbls 'G' 13256' - 14000' Kick off Plug #2, 78.5 bbls 'G' 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) July 28, 1998 I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. ~4-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water.~~ ~le~hi~Sb . c.i 1998 Alaska 0il & Gas Cons. Commission Anchorage Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. West Sak 11600' 7084' HRZ 15270' 8974' Ku paru k 15315' 8988' 31. List of Attachments Summary of Daily Drilling .Reports, Surveys 32. I hereby certify that going is/t~e,~nd correct to the best of my knowledge Signed (.._.~.,.¢,.//¢// ,,,;////"/_ Lowell C,~te.,,~ 7~ ( ~(_.../~ ~4fle. Drilling Engineering Supervisor Date ~' - ~-2~' P~-I 4/ 98-105 Prepared By Name/Number: Carol Withey, 564-4114 Well l~u_.o25er Permit No. / Approval No. ~NSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21.' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 28: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 2?: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28.' If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 BP Exploration / Arco Alaska Date: To: Attn: From: September 1, 1998 Alaska Oil & Gas Conservation Commission Mr. Steve McMains Carol Withey Technical Assistant Shared Services Drilling Steve: Freeze protection of this well was not necessary due to the shod period of time between completion of well drilling operations and the date of first production. In addition to this, the well was drilled during the summer months which precipitated warm temperatures. Cc: Well File Operator ARCO Performance Enquiry Report Date 21:54, 01 Sep 98 Page The analysis is from - 16:30, 09 Jun 98 - to - 04:00, 07 Jul 98 Programs in Result Table: P2-14 Well Type P2-14 Event P2-14 Event Time From Time To Duration Description E.M.W.(equivalent mud weight) 16:30, 09 Jun 98 16:30, 09 Jun 98 0 hr 0 min Obtained leak off 13.0 04:00, 07 Jul 98 04:00, 07 Jul 98 0 hr 0 min Obtained required level of integrity 12.6 Hole Size MIDR 9-7/8 6-3/4 Progress Report Facility Pt Mac 2 Well P2-14PB 1 Rig Nabors 33E Page 1 Date 01 September98 Date/Time 30 May 98 03:00-05:00 05:00-06:00 06:00-10:30 10:30-14:00 14:00-15:30 15:30-16:30 16:30-18:30 18:30-19:00 19:00-20:30 20:30-21:30 21:30-23:30 23:30-00:30 31 May 98 00:30-06:00 06:00-15:00 15:00-15:30 15:30-16:00 16:00-17:00 17:00-17:30 17:30-18:00 18:00-18:30 18:30-06:00 O1 Jun 98 06:00-16:30 16:30-17:00 17:00-17:30 17:30-18:00 18:00-06:00 02 Jun 98 06:00-06:30 06:30-07:00 07:00-09:30 09:30-10:00 10:00-10:30 10:30-12:00 12:00-00:30 03 Jun 98 00:30-01:30 O1:30-03:30 03:30-05:00 05:00-06:00 06:00-08:30 08:30-04:30 04 Jun 98 04:30-05:30 05:30-06:00 06:00-10:00 10:00-12:30 12:30-14:30 14:30-19:00 19:00-06:00 05 Jun 98 06:00-06:00 06 Jun 98 06:00-17:00 17:00-19:30 19:30-23:30 23:30-02:00 07 Jun 98 02:00-04:00 04:00-06:00 06:00-07:00 Duration 2hr lhr 4-1/2 hr 3-1/2 hr 1-1/2 hr lhr 2hr 1/2 hr 1-1/2 hr lhr 2hr lhr 5-1/2 hr 9 hr 1/2 hr 1/2 hr lhr 1/2 hr 1/2 hr 1/2 hr 11-1/2 hr 10-1/2 hr 1/2 hr 1/2 hr 1/2 hr 12hr 1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 12-1/2 hr 1 hr 2hr 1-1/2 hr lhr 2-1/2 hr 20 hr 1 hr 1/2 hr 4 hr 2-1/2 hr 2hr 4-1/2 hr llhr 24 hr llhr 2-1/2 hr 4hr 2-1/2 hr 2 hr 2 hr 1 hr Activity Rig moved 100.00 % Rigged up High pressure lines Rigged up High pressure lines (cont...) Made up BHA in derrick Made up BHA no. 1 Circulated at 40.0 ft Drilled to 220.0 ft Pulled out of hole to 40.0 ft Made up BHA no. 1 Circulated at 200.0 ft Drilled to 280.0 ft Took Gyro survey at 250.0 ft Drilled to 550.0 ft Repaired Shaker discharge line R.I.H. to 500.0 ft Washed to 550.0 ft Took Gyro survey at 550.0 ft Drilled to 638.0 ft Took Gyro survey at 638.0 ft Drilled to 645.0 ft Repaired Shaker discharge line Repaired Shaker discharge line (cont...) R.I.H. to 645.0 ft Circulated at 645.0 ft Took Gyro survey at 645.0 ft Drilled to 1312.0 ft Drilled to 1312.0 ft (cont...) Circulated at 1362.0 ft Pulled out of hole to 188.0 ft Pulled BHA Serviced Top drive R.I.H. to 1362.0 ft Drilled to 2502.0 ft Circulated at 2502.0 ft Pulled out of hole to 188.0 ft Functioned downhole tools at 30.0 ft R.I.H. to 1000.0 ft R.I.H. to 2502.0 ft (cont...) Drilled to 3767.0 ft Circulated at 3767.0 ft Pulled out of hole to 3200.0 ft Pulled out of hole to 3200.0 ft (cont...) Pulled BHA Made up BHA no. 2 R.I.H. to 3767.0 ft Drilled to 4800.0 ft Drilled to 6235.0 ft (cont...) Drilled to 6743.0 ft (cont...) Circulated at 6743.0 ft Pulled out of hole to 1096.0 ft R.I.H. to 6743.0 ft Circulated at 6743.0 ft Pulled out of hole to 3000.0 ft Pulled out of hole to 1096.0 ft (cont...) Progress Report Facility Pt Mac 2 Well P2-14PB 1 Rig Nabors 33E Page 2 Date 01 September 98 Date/Time 07:00-11:00 11:00-13:00 13:00-13:30 13:30-22:00 22:00-22:30 22:30-00:00 08 Jun 98 00:00-00:30 00:30-01:15 01:15-01:45 01:45-03:00 03:00-06:00 06:00-06:30 06:30-06:45 06:45-07:15 07:15-07:30 07:30-08:00 08:00-10:00 10:00-11:30 11:30-12:30 12:30-17:00 17:00-22:00 22:00-23:00 23:00-04:00 09 Jun 98 04:00-05:00 05:00-05:30 05:30-06:00 06:00-07:30 07:30-08:30 08:30-10:30 10:30-11:30 11:30-12:00 12:00-14:00 14:00-15:30 15:30-16:00 16:00-16:30 16:30-18:30 18:30-19:00 19:00-21:30 21:30-22:00 22:00-06:00 10 Jun 98 06:00-06:00 11 Jun 98 06:00-02:00 12 Jun 98 02:00-03:00 03:00-03:30 03:30-06:00 06:00-19:00 19:00-20:00 20:00-04:30 13 Jun 98 04:30-06:00 06:00-06:15 06:15-06:30 06:30-09:30 09:30-10:00 10:00-15:30 Duration 4 hr 2hr 1/2 hr 8-1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 3/4 hr 1/2 hr 1-1/4 hr 3 hr 1/2 hr 1/4 hr 1/2 hr 1/4 hr 1/2 hr 2 hr 1-1/2 hr lhr 4-1/2 hr 5hr 1 hr 5 hr lhr 1/2 hr 1/2 hr 1-1/2 hr 1 hr 2 hr 1 hr 1/2 hr 2hr 1-1/2 hr 1/2 hr 1/2 hr 2hr 1/2 hr 2-1/2 hr 1/2 hr 8hr 24 hr 20 hr 1 hr 1/2 hr 2-1/2 hr 13hr lhr 8-1/2 hr 1-1/2 hr 1/4 hr 1/4 hr 3 hr 1/2 hr 5-1/2 hr Activity Pulled BHA Rigged up Casing handling equipment Held safety meeting Ran Casing to 6727.0 ft (10-3/4in OD) Rigged up Cement head Circulated at 6727.0 ft Pumped Water spacers - volume 70.000 bbl Mixed and pumped slurry - 307.000 bbl Mixed and pumped slurry - 153.000 bbl Displaced slurry - 609.000 bbl Circulated at 2077.0 ft Circulated at 2077.0 ft (cont...) Pumped Water spacers - volume 50.000 bbl Mixed and pumped slurry - 317.000 bbl Displaced slurry - 199.000 bbl Cleared Bell nipple Rigged down Casing handling equipment Removed Bell nipple Installed Casing spool Rigged up BOP stack Tested BOP stack Installed Wear bushing Made up BHA no. 3 R.I.H. to 1958.0 ft Washed to 2076.0 ft Drilled installed equipment - DV collar Drilled installed equipment - DV collar (cont...) Serviced Top drive R.I.H. to 6458.0 ft Washed to 6640.0 ft Tested Casing Serviced Block line Drilled installed equipment - Float collar Circulated at 6767.0 ft Performed formation integrity test Drilled to 6928.0 ft Pulled out of hole to 6700.0 ft Circulated at 6700.0 ft R.I.H. to 6928.0 ft Drilled to 7550.0 ft Drilled to 9483.0 ft (cont...) Drilled to 10850.0 ft (cont...) Pulled out of hole to 10385.0 ft R.I.H. to 10850.0 ft Drilled to 11083.0 ft Drilled to 12120.0 ft (cont...) Repaired Main engine Drilled to 12690.0 ft Circulated at 12690.0 ft Circulated at 12690.0 ft (cont...) Flow check Pulled out of hole to 8040.0 ft Held safety meeting Singled in drill pipe to 12181.0 ft Progress Report Facility Pt Mac 2 Well P2-14PB 1 Page 3 Rig Nabors 33E Date 01 September 98 Date/Time 15:30-16:00 16:00-00:30 14 Jun 98 00:30-01:30 01:30-06:00 06:00-14:00 14:00-16:00 16:00-16:30 16:30-00:00 15 Jun 98 00:00-00:30 00:30-05:30 05:30-06:00 06:00-07:30 07:30-07:45 07:45-08:00 08:00-15:00 15:00-19:00 19:00-19:30 19:30-20:00 20:00-00:00 16 Jun 98 00:00-00:30 00:30-02:00 02:00-04:00 04:00-06:00 06:00-10:30 10:30-16:30 16:30-17:30 17:30-18:00 18:00-18:30 18:30-21:30 21:30-00:00 17 Jun 98 00:00-01:30 01:30-02:00 02:00-04:00 04:00-05:00 05:00-06:00 06:00-06:30 06:30-07:00 07:00-07:30 07:30-11:30 11:30-23:00 23:00-06:00 18 Jun 98 06:00-19:00 19:00-20:30 20:30-06:00 19 Jun 98 06:00-19:30 19:30-22:00 22:00-22:15 22:15-02:30 20 Jun 98 02:30-06:00 06:00-07:30 07:30-08:00 08:00-08:30 08:30-09:00 Duration 1/2 hr 8-1/2 hr 1 hr 4-1/2 hr 8hr 2hr 1/2 hr 7-1/2 hr 1/2 hr 5hr 1/2 hr 1-1/2 hr 1/4 hr 1/4 hr 7hr 4 hr 1/2 hr 1/2 hr 4hr 1/2 hr 1-1/2 hr 2hr 2hr 4-1/2 hr 6hr 1 hr 1/2 hr 1/2 hr 3 hr 2-1/2 hr 1-1/2 hr 1/2 hr 2hr 1 hr 1 hr 1/2 hr 1/2 hr 1/2 hr 4hr 11-1/2 hr 7hr 13hr 1-1/2 hr 9-1/2 hr 13-1/2 hr 2-1/2 hr 1/4 hr 4-1/4 hr 3-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 1/2 hr Activity R.I.H. to 12690.0 ft Drilled to 13370.0 ft Serviced Suction valve Drilled to 13560.0 ft Drilled to 14285.0 ft (cont...) Serviced Liner Serviced Top drive Drilled to 14784.0 ft Serviced Liner Drilled to 14974.0 ft Circulated at 14974.0 ft Circulated at 14974.0 ft (cont...) Circulated at 14974.0 ft Flow check Pulled out of hole to 250.0 ft Pulled BHA Retrieved Bore protector Installed BOP test plug assembly Tested Well control Installed BOP test plug assembly Tested Pipe ram Repaired Transfer pump Tested Testing equipment Tested Well control Repaired Internal BOPs Tested Internal BOPs Retrieved BOP test plug assembly Installed Bore protector Made up BHA no. 4 R.I.H. to 6700.0 ft Serviced Block line Serviced Top drive R.I.H. to 10706.0 ft Circulated at 10706.0 ft R.I.H. to 12500.0 ft R.I.H. to 114974.0 ft (cont...) Circulated at 14974.0 ft Drilled to 14980.0 ft Circulated at 14980.0 ft Circulated at 14980.0 ft Drilled to 15140.0 ft Drilled to 15306.0 ft (cont...) Repaired Suction valve Drilled to 15600.0 ft Drilled to 16207.0 ft (cont...) Circulated at 16207.0 ft Flow check Pulled out of hole to 6700.0 ft R.I.H. to 14500.0 ft R.I.H. to 14940.0 ft (cont...) Logged hole with LWD: Formation evaluation (FE) from 14940.0 ft to 14980.0 ft R.I.H. to 15740.0 ft Washed to 15740.0 ft Progress Report Facility Pt Mac 2 Well P2-14PB 1 Page 4 Rig Nabors 33E Date 01 September 98 Date/Time 09:00-09:30 09:30-12:00 12:00-12:15 12:15-20:00 20:00-23:00 23:00-23:30 23:30-00:00 21 Jun 98 00:00-02:30 02:30-04:30 04:30-06:00 06:00-07:00 07:00-10:00 10:00-12:00 12:00-12:15 12:15-14:00 14:00-15:00 15:00-21:00 21:00-22:00 22:00-06:00 22 Jun 98 06:00-07:30 07:30-08:00 08:00-10:30 10:30-10:45 10:45-11:00 11:00-11:30 11:30-12:00 12:00-13:00 13:00-23:30 23:30-00:30 23 Jun 98 00:30-00:45 00:45-01:00 01:00-06:00 06:00-07:00 07:00-07:30 07:30-08:00 08:00-13:30 13:30-13:45 13:45-14:00 14:00-15:00 15:00-15:15 15:15-19:00 19:00-22:30 22:30-22:45 22:45-23:00 23:00-23:30 23:30-01:15 24Jun 98 01:15-02:00 02:00-05:45 05:45-06:00 06:00-09:00 09:00-13:30 13:30-22:30 22:30-02:30 25 Jun 98 02:30-06:00 Duration 1/2 hr 2-1/2 hr 1/4 hr 7-3/4 hr 3hr 1/2 hr 1/2 hr 2-1/2 hr 2hr 1-1/2 hr 1 hr 3hr 2 hr 1/4 hr 1-3/4 hr 1 hr 6 hr lhr 8hr 1-1/2 hr 1/2 hr 2-1/2 hr 1/4 hr 1/4 hr 1/2 hr 1/2 hr 1 hr 10-1/2 hr 1 hr 1/4 hr 1/4 hr 5hr lhr 1/2 hr 1/2 hr 5-1/2 hr 1/4 hr 1/4 hr 1 hr 1/4 hr 3-3/4 hr 3-1/2 hr 1/4 hr 1/4 hr 1/2 hr 1-3/4 hr 3/4 hr 3-3/4 hr 1/4 hr 3 hr 4-1/2 hr 9 hr 4hr 3-1/2 hr Activity R.I.H. to 16207.0 ft Circulated at 16207.0 ft Flow check Pulled out of hole to 250.0 ft Pulled BHA Serviced Drillfloor / Derrick Made up BHA no. 5 R.I.H. to 6000.0 ft Repaired Electromagnetic brake Serviced Block line Serviced Block line (cont...) R.I.H. to 16207.0 ft Circulated at 16207.0 ft Held safety meeting Rigged up Logging/braided cable equipment Conducted electric cable operations Conduct braided cable operations - 5/16 size cable Rigged up sub-surface equipment - Survey instruments Conducted electric cable operations Conducted electric cable operations (cont...) Rigged down Logging/braided cable equipment Circulated at 16207.0 ft Held safety meeting Pumped Water spacers - volume 10.000 bbl Mixed and pumped slurry - 100.000 bbl Displaced slurry - 256.000 bbl Pulled out of hole to 14784.0 ft Wait on cement R.I.H. to 15365.0 ft Circulated at 15365.0 ft Flow check Pulled out of hole to 2000.0 ft Pulled out of hole to 4.0 ft (cont...) Retrieved B ore protector Installed BOP test plug assembly Tested Well control Retrieved BOP test plug assembly Installed Bore protector Serviced Top drive Made up BHA no. 6 R.I.H. to 14000.0 ft Circulated at 14000.0 ft Pumped Water spacers - volume 10.000 bbl Mixed and pumped slurry - 78.500 bbl Displaced slurry - 227.000 bbl Pulled out of hole to 12106.0 ft Circulated at 12106.0 ft Pulled out of hole to 4.0 ft Pulled BHA Made up BHA no. 7 R.I.H. to 13256.0 ft Drilled cement to 13865.0 ft Circulated at 13865.0 ft Drilled to 13869.0 ft Progress Report Facility Pt Mac 2 Well P2-14 Rig Nabors 33E Page 5 Date 01 September 98 Date/Time 06:00-06:00 26 Jun 98 06:00-10:00 10:00-11:00 11:00-00:30 27 Jun 98 00:30-03:30 03:30-06:00 06:00-09:30 09:30-11:30 11:30-13:30 13:30-16:30 16:30-18:00 18:00-21:00 21:00-22:00 22:00-02:00 28 Jun 98 02:00-03:30 03:30-06:00 06:00-12:00 12:00-14:00 14:00-15:30 15:30-21:00 21:00-21:30 21:30-22:00 22:00-03:30 29 Jun 98 03:30-04:00 04:00-05:00 05:00-06:00 06:00-06:00 30 Jun 98 06:00-11:00 11:00-13:00 13:00-14:00 14:00-14:30 14:30-15:00 15:00-06:00 O1 Jul 98 06:00-20:00 20:00-22:00 22:00-22:30 22:30-01:30 02 Jul 98 01:30-02:30 02:30-03:30 03:30-06:00 06:00-09:00 09:00-15:00 15:00-18:00 18:00-18:30 18:30-19:00 19:00-19:30 19:30-21:00 21:00-21:30 21:30-03:00 03 Jul 98 03:00-04:00 04:00-06:00 06:00-13:00 13:00-15:30 15:30-15:45 Duration 24 hr 4hr lhr 13-1/2 hr 3hr 2-1/2 hr 3-1/2 hr 2hr 2hr 3 hr 1-1/2 hr 3hr 1 hr 4 hr 1-1/2 hr 2-1/2 hr 6hr 2hr 1-1/2 hr 5-1/2 hr 1/2 hr 1/2 hr 5-1/2 hr 1/2 hr lhr 1 hr 24 hr 5 hr 2 hr lhr 1/2 hr 1/2 hr 15hr 14 hr 2hr 1/2 hr 3 hr lhr 1 hr 2-1/2 hr 3 hr 6 hr 3hr 1/2hr 1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 5-1/2 hr 1 hr 2hr 7hr 2-1/2 hr 1/4 hr Activity Drilled to 14000.0 ft (cont...) Drilled to 14094.0 ft (cont...) Circulated at 14094.0 ft Drilled to 14408.0 ft Circulated at 14408.0 ft Pulled out of hole to 10000.0 ft Pulled out of hole to 664.0 ft (cont...) Pulled BHA Made up BHA no. 8 R.I.H. to 6700.0 ft Serviced Block line R.I.H. to 14230.0 ft Reamed to 14408.0 ft Drilled to 14473.0 ft Fished at 3195.0 ft Pulled out of hole to 12000.0 ft Pulled out of hole to 1115.0 ft (cont...) Pulled BHA Made up BHA no. 9 R.I.H. to 14010.0 ft Washed to 14473.0 ft Circulated at 14473.0 ft Drilled to 14537.0 fl Circulated at 14537.0 ft Repaired SCR Drilled to 14567.0 ft Drilled to 14970.0 ft (cont...) Drilled to 15015.0 ft (cont...) Circulated at 15015.0 ft Pulled out of hole to 13504.0 ft R.I.H. to 15015.0 ft Circulated at 15015.0 ft Drilled to 15175.0 fl Drilled to 15350.0 fl (cont...) Circulated at 15350.0 ft Drilled to 15380.0 fl Circulated at 15350.0 ft Pulled out of hole to 13005.0 ft R.I.H. to 15380.0 fl Circulated at 15380.0 ft Circulated at 15380.0 ft (cont...) Pulled out of hole to 1115.0 ft Pulled BHA Retrieved Wear bushing Installed BOP test plug assembly Tested Top ram Rigged up Casing handling equipment Held safety meeting Ran Casing to 6600.0 ft (7-5/8in OD) Circulated at 6600.0 ft Ran Casing to 7-5/8in (8600.0 ft OD) Ran Casing to 15375.0 fl (7-5/8in OD) (cont...) Circulated at 15375.0 ft Rigged up Cement head Progress Report Facility Pt Mac 2 Well P2-14 Rig Nabors 33E Page 6 Date 01 September 98 Date/Time 15:45-16:15 16:15-16:30 16:30-18:00 18:00-18:30 18:30-23:00 23:00-00:00 04 Jul 98 00:00-01:00 01:00-02:00 02:00-03:00 03:00-06:00 06:00-18:00 18:00-19:00 19:00-21:00 21:00-04:30 05 Jul 98 04:30-05:00 05:00-06:00 06:00-07:30 07:30-09:00 09:00-13:00 13:00-15:00 15:00-20:00 20:00-22:00 22:00-02:00 06 Jul 98 02:00-06:00 06:00-23:00 23:00-00:00 07 Jul 98 00:00-02:30 02:30-03:30 03:30-04:00 04:00-06:00 06:00-19:30 19:30-22:00 22:00-03:30 08 Jul 98 03:30-04:30 04:30-06:00 06:00-07:30 07:30-08:00 08:00-11:00 11:00-11:30 11:30-14:00 14:00-17:00 17:00-06:00 09 Jul 98 06:00-06:00 10 Jul 98 06:00-07:30 07:30-08:30 08:30-09:00 09:00-09:30 09:30-12:00 12:00-12:15 12:15-18:30 18:30-20:00 20:00-20:30 20:30-20:45 20:45-22:00 Duration 1/2 hr 1/4 hr 1-1/2 hr 1/2 hr 4-1/2 hr lhr 1 hr 1 hr 1 hr 3 hr 12hr 1 hr 2hr 7-1/2 hr 1/2 hr lhr 1-1/2 hr 1-1/2 hr 4hr 2hr 5hr 2hr 4hr 4hr 17hr 1 hr 2-1/2 hr 1 hr 1/2 hr 2 hr 13-1/2 hr 2-1/2 hr 5-1/2 hr lhr 1-1/2 hr 1-1/2 hr 1/2 hr 3 hr 1/2 hr 2-1/2 hr 3 hr 13hr 24 hr 1-1/2 hr 1 hr 1/2 hr 1/2 hr 2-1/2 hr 1/4 hr 6-1/4 hr 1-1/2 hr 1/2 hr 1/4 hr 1-1/4 hr Activity Pumped Synthetic based mud spacers - volume 50.000 bbl Mixed and pumped slurry - 61.000 bbl Displaced slurry - 701.000 bbl Rigged down Cement head Installed Slip & seal assembly Rigged up Drillstring handling equipment Installed Wear bushing Laid down 950.0 ft of Drillpipe Serviced Block line Laid down Drillpipe of 2850.0 ft Laid down 10000.0 ft of Drillpipe (cont...) Serviced Draw works Repaired Drillstring handling equipment Laid out Drillpipe from derrick Retrieved Wear bushing Installed BOP test plug assembly Tested Internal BOPs Serviced Top ram Repaired Internal BOPs Installed Top drive Tested BOP stack Installed Wear bushing Made up BHA no. 10 Singled in drill pipe to 2500.0 ft Singled in drill pipe to 15295.0 ft (cont...) Tested Casing Drilled installed equipment - Float collar Circulated at 15400.0 ft Performed formation integrity test Drilled to 15450.0 ft Drilled to 15961.0 ft (cont...) Circulated at 15961.0 ft Pulled out of hole to 347.0 ft Pulled BI-IA Made up BHA no. 11 Made up BHA no. 11 (cont...) R.I.H. to 1000.0 ft R.I.H. to 11200.0 ft Serviced Top drive R.I.H. to 15921.0 ft Washed to 15961.0 ft Drilled to 16475.0 ft Drilled to 17017.0 ft (cont...) Circulated at 17017.0 ft Pulled out of hole to 15370.0 ft Serviced Top drive R.I.H. to 17017.0 ft Circulated at 17017.0 ft Flow check Pulled out of hole to 300.0 ft Pulled BHA Serviced Drillfloor / Derrick Held safety meeting Rigged up Casing handling equipment Progress Report Facility Pt Mac 2 Well P2-14 Rig Nabors 33E Page 7 Date 01 September 98 Date/Time 22:00-22:30 22:30-02:00 11 Jul 98 02:00-02:15 02:15-02:30 02:30-06:00 06:00-13:00 13:00-15:00 15:00-16:00 16:00-16:30 16:30-18:00 18:00-18:15 18:15-18:45 18:45-19:30 19:30-20:30 20:30-21:00 21:00-22:00 22:00-00:00 12 Jul 98 00:00-04:00 04:00-04:30 04:30-04:45 04:45-05:00 05:00-06:00 06:00-08:00 08:00-08:15 08:15-08:30 08:30-09:00 09:00-10:00 10:00-15:00 15:00-16:30 16:30-19:00 19:00-20:00 20:00-01:00 13 Jul 98 01:00-02:00 02:00-03:00 03:00-05:00 05:00-06:00 06:00-13:30 13:30-15:00 15:00-16:00 16:00-17:30 17:30-18:00 18:00-20:00 20:00-22:00 22:00-01:00 14 Jul 98 01:00-01:30 01:30-02:00 02:00-06:00 06:00-09:30 09:30-14:00 14:00-14:30 14:30-17:00 17:00-06:00 15 Jul 98 06:00-07:00 07:00-07:30 Duration 1/2 hr 3-1/2 hr 1/4 hr 1/4 hr 3-1/2 hr 7hr 2hr 1 hr 1/2 hr 1-1/2 hr 1/4 hr 1/2 hr 3/4 hr 1 hr 1/2 hr lhr 2hr 4hr 1/2 hr 1/4 hr 1/4 hr lhr 2hr 1/4 hr 1/4 hr 1/2 hr lhr 5 hr 1-1/2 hr 2-1/2 hr 1 hr 5 hr 1 hr 1 hr 2hr lhr 7-1/2 hr 1-1/2 hr 1 hr 1-1/2 hr 1/2 hr 2 hr 2 hr 3hr 1/2 hr 1/2 hr 4 hr 3-1/2 hr 4-1/2 hr 1/2 hr 2-1/2 hr 13hr lhr 1/2 hr Activity Held safety meeting Ran Liner to 1820.0 ft (4-1/2in OD) Installed Liner hanger Circulated at 1820.0 ft Ran Liner in stands to 4500.0 ft Ran Liner in stands to 15308.0 ft (cont...) Circulated at 15308.0 ft Ran Liner in stands to 17017.0 ft Space out tubulars Circulated at 17017.0 ft Held safety meeting Pumped Seawater spacers - volume 35.000 bbl Mixed and pumped slurry - 61.000 bbl Displaced slurry - 182.000 bbl Set Liner hanger at 15125.0 ft with 3500.0 psi Pulled Drillpipe in stands to 11200.0 ft Serviced Block line Pulled Drillpipe in stands to 20.0 ft Rigged down sub-surface equipment - Setting tools Retrieved Bore protector Installed BOP test plug assembly Tested Well control Tested Well control (cont...) Retrieved BOP test plug assembly Installed B ore protector Serviced Drillfloor / Derrick Made up BHA no. 12 R.I.H. to 14913.0 ft Circulated at 14913.0 ft Drilled cement to 15136.0 ft Circulated at 15136.0 ft Pulled out of hole to 130.0 ft Pulled BHA Rigged up Drillstring handling equipment Made up BHA no. 13 R.I.H. to 3000.0 ft R.I.H. to 15136.0 ft (cont...) Drilled cement to 15160.0 ft Tested Liner - Via string Drilled cement to 15214.0 ft Washed to 15790.0 ft R.I.H. to 16936.0 ft Circulated at 16936.0 ft Circulated at 16936.0 ft Tested Liner - Via string Flow check Pulled out of hole to 8000.0 ft Pulled out of hole to 2170.0 ft (cont...) Pulled BHA Held safety meeting Rigged up sub-surface equipment - Gun assembly Ran Drillpipe in stands to 16000.0 ft Ran Drillpipe in stands to 16929.0 ft (cont...) Pulled Drillpipe in stands to 16569.0 ft Progress Report Facility Pt Mac 2 Well P2-14 Rig Nabors 33E Page 8 Date 01 September 98 Date/Time 16 Jul 98 17 Jul 98 18 Jul 98 07:30-08:00 08:00-08:30 08:30-09:30 09:30-09:45 09:45-10:00 10:00-12:00 12:00-14:30 14:30-15:00 15:00-01:00 01:00-04:30 04:30-05:00 05:00-06:00 06:00-06:15 06:15-06:30 06:30-09:30 09:30-10:00 10:00-11:00 11:00-12:30 12:30-13:00 13:00-13:30 13:30-18:00 18:00-18:15 18:15-18:30 18:30-20:15 20:15-20:30 20:30-21:00 21:00-01:00 01:00-01:30 01:30-06:00 06:00-06:15 06:15-06:30 06:30-00:30 00:30-00:45 00:45-01:00 01:00-01:30 01:30-01:45 01:45-06:00 06:00-06:30 06:30-08:30 08:30-09:00 09:00-09:30 09:30-09:45 09:45-10:00 10:00-11:00 11:00-14:00 14:00-15:00 15:00-16:00 16:00-16:30 16:30-18:00 18:00-19:30 19:30-20:00 20:00-20:30 20:30-23:00 23:00-02:00 Duration 1/2 hr 1/2 hr lhr 1/4 hr 1/4 hr 2hr 2-1/2 hr 1/2 hr 10hr 3-1/2 hr 1/2 hr 1 hr 1/4 hr 1/4 hr 3hr 1/2 hr lhr 1-1/2 hr 1/2 hr 1/2 hr 4-1/2 hr 1/4hr 1/4 hr 1-3/4 hr 1/4 hr 1/2 hr 4 hr 1/2 hr 4-1/2 hr 1/4 hr 1/4 hr 18hr 1/4 hr 1/4 hr 1/2 hr 1/4 hr 4-1/4 hr 1/2 hr 2 hr 1/2 hr 1/2 hr 1/4 hr 1/4 hr 1 hr 3hr lhr lhr 1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 3 hr Activity Held safety meeting Rigged up High pressure lines Set packer at 14615.0 ft with 0.0 psi Perforated Monitor pressures Reverse circulated at 14600.0 ft Pulled Drillpipe in stands to 14709.0 ft Held safety meeting Laid down 11100.0 ft of 4in OD drill pipe Laid down 1100.0 ft of Drillpipe Held safety meeting Retrieved Gun assembly Retrieved Gun assembly (cont...) Held safety meeting Retrieved Gun assembly Rigged down Handling equipment Rigged up Drillstring handling equipment Ran Drillpipe in stands to 3800.0 ft Held safety meeting Rigged up Drillstring handling equipment Laid down 3800.0 ft of 4in OD drill pipe Removed Bore protector Installed BOP test plug assembly Serviced Top ram Tested Top ram Retrieved BOP test plug assembly Rigged up Tubing handling equipment Held safety meeting Ran Tubing to 4-1/2in (1500.0 ft OD) Ran Tubing to 1500.0 ft (4-1/2in OD) (cont...) Held safety meeting Ran Tubing to 13000.0 ft (4-1/2in OD) Installed SCSSSV nipple assembly Installed SCSSSV control line Tested Dual control line Held safety meeting Ran Tubing to 4-1/2in (15200.0 ft OD) Ran Tubing to 16100.0 ft (4-1/2in OD) (cont...) Space out tubulars Installed Tubing hanger Ran Tubing on landing string to 15126.0 ft Installed Emergency seal assembly Installed Hanger plug Rigged down Tubing handling equipment Removed BOP stack Installed Tubing bonnet Installed Xmas tree Tested Tubing bonnet Tested Xmas tree Removed Hanger plug Rigged up High pressure lines Held safety meeting Reverse circulated at 15126.0 ft Functioned Permanent packer Progress Report Facility Pt Mac 2 Well P2-14 Rig Nabors 33E Page 9 Date 01 September 98 Date/Time 19 Jul 98 02:00-02:30 02:30-03:00 03:00-03:30 03:30-04:00 04:00-06:00 Duration 1/2 hr 1/2 hr 1/2 hr 1/2 hr 2hr Activity Installed Hanger plug Prepare mouse/rat hole Held safety meeting Skid rig Rigged up Drillfloor / Derrick P2-14 Perfs Interval Feet SPF 15645-15733 88 1 15777-15865 88 1 15909-16129 220 4 16173-16393 220 4 16437-16569 132 4 Date 15-Jul-98 15-Jul-98 15-Jul-96 15-Jul-98 15-Jul-95 Type DP Conveyed DP Conveyed DP Conveyed DP Conveyed DP Conveyed Comment Shared Services Drilling Point Mclntrye Alaska State Plane Zone 4 Point Mclntyre Pad 2 P2-14 SURVEY REPORT August, ~998 Your Ref: API-500292288800 Last Survey Date 09-July-98 Job# AKMMS0246 KBE - 46.85' sp,~n~-sun DRILLING SERVIt-r=q ~ olvmo~ or D'Lt:aZR I,OUST~IrJ. Survey Ref: svy498 Shared Services Drilling Point Mclntrye Measured Sub-Sea Ve~ical Depth Incl. Azim. Depth Depth (~) (fi) (fi) 13800.00 60.820 35.420 8040.80 8087.65 13900.00 58.470 36.840 8091.33 8138.18 13945.14 57.420 37.510 8115.29 8162.14 14012.71 53.490 38.800 8153.60 8200.45 14102.15 51.660 37.790 8207.95 8254.80 14199.66 50.410 37.270 8269.27 8316.12 14294.26 48.580 33.900 8330.72 8377.57 14365.20 45.630 31.390 8379.00 8425.85 14463.17 41.240 26.330 8450.15 8497.00 14555.55 39.760 24.140 8520.40 8567.25 14650.43 41.730 26.880 8592.28 8639.13 14744.51 46.430 31.640 8659.87 8706.72 14840.30 48.790 33.360 8724.44 8771.29 14930.42 53.040 34.070 8781.25 8828.10 15025.59 59.590 35.000 8834.01 8880.86 15118.01 66.840 34.080 8875.63 8922.48 15212.50 71.590 35.440 8909.15 8956.00 15297.47 71.560 35.760 8936.01 8982.86 15354.34 74.090 33.460 8952.80 8999.65 15418.10 77.340 30.960 8968.53 9015.38 15452.59 81.490 27.960 8974.87 9021.72 15483.90 85.210 24.94'b-'- 8978.49 9025.34 15515.77 89.450 25.260 8979.98 9026.83 15550.09 89.940 22.890 8980.16 9027.01 15580.27 90.120 21.610 8980.14 9026.99 15611.78 91.360 21.590 8979.74 9026.59 15647.65 92.470 23.080 8978.54 9025.39 15679.62 90.430 23.290 8977.73 9024.58 15709.41 88.180 22.870 8978.09 9024.94 15740.61 88.210 22.720 8979.07 9025.92 Sperry-Sun Drilling Services Survey Report for P2-14 Your Ref: API-500292288800 Local Coordinates Nothings (fi) 7438.65 N 7508.35 N 7538.83 N 7582.59 N 7638.33 N 7698.45 N 7756.91N 7800.65 N 7859.53 N 7913.78 N 7969.65 N 8026.64 N 8086.29 N 8144.45 N 8209.64 N 8277.56 N 8350.11N 8415.66 N 8460.37 N 8512.64 N 8542.16 N 8569.99 N 8598.82 N 8630.15 N 8658.08 N 8687.37 N 8720.53 N 8749.91N 8777.31N 8806.06 N Global Coordinates Dogleg Ve~ical Eastings Nothings Eastings Rate Section (fi) (fi) (fi) (°/100fi) (fi) 6856.44E 6006166.62N 688066.52 E 10085.38 6907.30 E 6006237.53N 688115.67E 2.650 10171.61 6930.42E 6006268.56N 688138.04E 2.644 10209.86 6964.78E 6006313.15N 688171.33E 6.025 10265.50 7008.80 E 6006369.94N 688213.99E 2.234 10336.52 7054.99 E 6006431.16 N 688258.70 E 1.347 10412.34 7096.86 E 6006490.62 N 688299.14 E 3.328 10484.17 7124.91E 6006535.03 N 688326.12 E 4.900 10535.89 7157.49 E 6006594.68 N 688357.27 E 5.715 10602.32 7183.08 E 6006649.54 N 688381.53 E 2.222 10660.79 7209.77 E 6006706.03 N 688406.86 E 2.804 10721.20 7241.84 E 6006763.79 N 688437.53 E 6.108 10785.82 7279.86 E 6006824.34N 688474.09 E 2.798 10856.21 7318.69 E 6006883.43 N 688511.50 E 4.755 10925.94 7363.58 E 6006949.69 N 688554.79 E 6.930 11004.93 7410.31E 6007018.73 N 688599.86 E 7.895 11087.21 7460.67 E 6007092.47 N 688648.45 E 5.204 11175.36 7507.60 E 6007159.14 N 688693.77 E 0.359 11255.90 7538.45 E 6007204.59 N 688723.52 E 5.892 11310.12 7571.37 E 6007257.65 N 688755.16 E 6.357 11371.56 7588.03 E 6007287.56 N 688771.11E 14.760 11405.06 7601.88 E 6007315.72 N 688784.27 E 15.262 11435.50 7615.38 E 6007344.86 N 688797.07 E 13.342 11466.50 7629.38 E 6007376.53 N 688810.30 E 7.052 11499.79 7640.80 E 6007404.73 N 688821.05 E 4.283 11528.81 7652.40 E 6007434.29 N 688831.93 E 3.936 11559.01 7666.03 E 6007467.77 N 688844.75 E 5.178 11593.49 7678.61 E 6007497.45 N 688856.61 E 6.415 11624.37 7690.28 E 6007525.13 N 688867.62 E 7.683 11653.12 7702.37 E 6007554.16 N 688879.00 E 0.490 11683.19 Comment Tie-on Survey Window Point Alaska State Plane Zone 4 Point Mclntyre Pad 2 Continued... 17 August, 1998 - 12:42 - 2 - DrillQuest Shared Services Drilling Point Mclntrye Measured Sub-Sea Ve~ical Depth Incl. Azim. Depth Depth (~) (fi) (fi) 15772.89 88.460 22.220 8980.01 9026.86 15804.99 89.230 22.810 8980.66 9027.51 15838.85 88.580 22.540 8981.31 9028.16 15871.00 86.920 20,310 8982.57 9029.42 15901.30 87.130 20.810 8984.14 9030,99 15933.92 87.260 19.550 8985.74 9032.59 15968.58 87.450 19.820 8987.34 9034.19 15996.97 87.380 19.190 8988.62 9035.47 16032.06 86.270 18.740 8990.56 9037.41 16065.32 87.110 18.590 8992.48 9039.33 16094.06 86.350 18.230 8994.12 9040,97 16129.11 86.730 19.140 8996.24 9043.09 16162.26 87.280 18.580 8997.97 9044.82 16189.60 87.310 17.170 8999.26 9046.11 16223.76 88.280 17.600 9000.57 9047.42 16257.94 88.890 20.370 9001.42 9048.27 16285.56 88.370 21.850 9002.08 9048.93 16321.22 88.950 21.260 9002.91 9049.76 16353.41 88.830 21,310 9003.53 9050.38 16379.73 88.090 20.730 9004.24 9051.09 16416.65 87.810 20.370 9005.56 9052.41 16448.37 87.720 20.500 9006.80 9053.65 16474.82 87,570 20.570 9007.89 9054.74 16511.42 87.630 19.560 9009.42 9056.27 16540.65 86.640 17.920 9010.88 9057.73 16571.34 85.040 18.910 9013.11 9059.96 16607,21 83.050 20.510 9016.83 9063.68 16638.34 82.160 21.530 9020.84 9067.69 16669.41 81.570 23.690 9025.23 9072.08 16705.23 79.580 23.410 9031.10 9077,95 Sperry-Sun Drilling Services Survey Report for P2-14 Your Ref: API-500292288800 Local Coordinates Nothings (fi) 8835.88 N 8865.52 N 8896.76 N 8926,66 N 8955.00 N 8985.58 N 9018.18 N 9044.91N 9078.04 N 9109.50 N 9136.72 N 9169.87 N 9201.19 N 9227.18 N 9259.76 N 9292.07 N 9317.82 N 9350.98 N 9380.97 N 9405.53 N 9440.08 N 9469,78 N 9494.53 N 9528.88 N 9556.52 N 9585.56 N 9619.14 N 9647.96 N 9676.35 N 9708.74 N Global Coordinates Dogleg Ve~ical Easfings Nothings Eastings Rate Section (fi) (fi) (fi) (°/100fi) 7714.70E 6007584.27N 688890.61E 1,731 11714.25 7726.99 E 6007614.20 N 688902.17 E 3.022 11745.16 7740.04 E 6007645.75 N 688914.46 E 2,079 11777.78 7751.77 E 6007675.93 N 688925.47 E 8.643 11808.54 7762.40 E 6007704,51N 688935.40 E 1.788 11837.38 7773.64E 6007735.35 N 688945.89 E 3.879 11868.37 7785.30 E 6007768.22 N 688956,76 E 0.952 11901.21 7794.77 E 6007795,18 N 688965,58 E 2,231 11928.08 7806.16 E 6007828.58 N 688976,16 E 3.413 11961.16 7816.78 E 6007860.29 N 688986,02 E 2,565 11992.46 7825.85 E 6007887.72 N 688994.42 E 2.925 12019.46 7837.05 E 6007921.13 N 689004,82 E 2.809 12052.44 7847.75 E 6007952.70 N 689014.75 E 2.366 12083.69 7856.14 E 6007978.89 N 689022.50 E 5.153 12109.30 7866.34 E 6008011.70 N 689031.91E 3.106 12141.21 7877.45 E 6008044.27 N 689042.24 E 8.296 12173.48 7887.40 E 6008070.26 N 689051.55 E 5.678 12199.88 7900.49 E 6008103.73 N 689063.84 E 2,320 12234.04 7912,18 E 6008133.99 N 689074,79 E 0,404 12264.84 7921.61 E 6008158.77 N 689083.63 E 3,572 12289.98 7934.56 E 6008193,63 N 689095.74 E 1,235 12325.14 7945.63 E 6008223.59 N 689106.08 E 0,498 12355.33 7954.90 E 6008248.55 N 689114.75 E 0.626 12380.52 7967.45 E 6008283.20 N 689126.46 E 2.762 12415.27 7976.83 E 6008311.06 N 689135,16 E 6,548 12442.80 7986.49 E 6008340.33 N 689144.12 E 6,126 12471.61 7998.53 E 6008374.19 N 689155.34E 7.103 12505.45 8009.60 E 6008403.27 N 689165.71 E 4,328 12534.95 8021.42 E 6008431.94 N 689176.84 E 7.139 12564.57 8035,54E 6008464.66 N 689190.16 E 5,609 12598.76 Comment Alaska State Plane Zone 4 Point Mclntyre Pad 2 Continued... 17 August, 1998 - 12:42 - 3 - Dr#lQuest Sperry-Sun Drilling Services Survey Report for P2-'14 Your Ref: API-500292288800 Shared Services Drilling Point Mclntrye Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 16736.60 77.660 23.280 9037.29 9084.14 16761.76 75.320 22.490 9043.16 9090,01 16796.66 72.240 21.510 9052.91 9099.76 16830.22 69,810 20.770 9063.82 9110.67 16860.85 69.410 20.440 9074.50 9121.35 16896.08 69.790 19.850 9086,78 9133.63 16928.67 70.430 19.590 9097.86 9144.71 16957.45 70.940 20.290 9107.38 9154.23 17017.00 70.940 20.290 9126.83 9173.68 9736.98 N 8047.73 E 6008493.19 N 689201.66 E 6.134 12628.49 9759.51N 8057.24 E 6008515,95 N 689210.62 E 9.789 12652.09 9790.58 N 8069.79 E 6008547.31N 689222.42 E 9.228 12684.27 9820.18 N 8081.24 E 6008577.17 N 689233.14 E 7.535 12714.61 9847.05 N 8091.34 E 6008604.29 N 689242,59 E 1.651 12741.98 9878.05 N 8102.72 E 6008635.55 N 689253.21E 1,905 12773.38 9906.90 N 8113.06 E 6008664.64 N 689262.85 E 2.102 12802.46 9932.43 N 8122.32 E 6008690.39 N 689271.49 E 2,900 12828.25 9985.22 N 8141.84 E 6008743.54N 689289.72 E 0.000 12881.82 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Fastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 38.170° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 17017.00ft., The Bottom Hole Displacement is 12883.87ft., in the Direction of 39.193° (True). Comment Projected Survey Alaska State Plane Zone 4 Point Mclntyre Pad 2 Con§nue~.. 17 August, 1998 - 12:42 - 4 - DrillQuest Shared Services Drilling Point Mclntrye Sperry. Sun Drilling Services Survey Report for P2-14 Your Ref: API-500292288800 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comments Measured Depth (ft) 13800.00 13900.00 17017.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 8087.65 7438.65 N 6856.44 E 8138.18 7508.35 N 6907.30 E 9173.68 9985.22 N 8141.84 E Comment Tie-on Survey Window Point Projected Survey 17 August, 1998.12:42 - 5 - DrillQuest 0 I::! I I--i_ I I~1G 19-Aug-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well P2-14 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 13,800.00' MD 13,900.00' MD 17,017.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) AUG 2. 6 1998 Ajsska Oii& Gas Cons. uommlss~on Anch0r~e 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Division of Dresser Industries, Inc. Shared Services Drilling Point Mclntrye Alaska State Plane Zone 4 Point Mclntyre Pad 2 P2-14PB1 ORIGINAL SURVEY REPORT 17 August, 1998 Your Ref: API-500292288870 Last Survey Date 20-July-98 Job# AKMMS0296 KBE - 46.85' nRILLING SERVICES AUG P-- Survey Ref: svy494 Shared Services Drilling Point Mclntrye Measured Depth Incl. Azim. (ft) 1000.00 5.800 60.740 1095.00 6.500 59.000 1123.64 6.880 59.920 1174,71 8.190 57.770 1215.50 9.550 55.410 1257.98 10.590 56.950 1290.00 11.330 55.330 1319.27 11.670 54.610 1354.96 12.440 54.120 1387.13 12.530 55.390 1410.77 13.010 56.400 1445.54 14.200 56.010 1475.76 15.190 52.950 1502.06 15.790 49.990 1534.87 16.090 49.220 1568.67 16.470 49.830 1593.47 16.400 49.790 1633.87 16.390 49.910 1666.76 16.320 48.800 1691.21 16.560 47.050 1728.08 17.190 44.010 1780.52 17.150 44.050 1824.37 17.360 44.020 1854.69 18.220 43.690 1871.89 18.440 44.450 1969.42 21,340 45.080 2067.09 23.380 44,830 2160.99 24.760 43.240 2259.28 27.280 44.410 2352.94 29.100 48.610 Sperry-Sun Drilling Services Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 950.51 997.36 13.99 N 53.90 E 1044.96 1091.81 19.11 N 62.70 E 1073.40 1120.25 20.80 N 65.57 E 1124.03 1170.88 24.27 N 71.30 E 1164.33 1211.18 27.74 N 76.54 E 1206.16 1253.01 31.87 N 82.71 E 1237.59 1284.44 35.27 N 87.77 E 1266.28 1313.13 38.62 N 92.55 E 1301.18 1348.03 42.96 N 98.60 E 1332,59 1379.44 46.97 N 104.28 E 1355.64 1402.49 49.90 N 108.61 E 1389.44 1436.29 54.45 N 115.41 E 1418.67 1465.52 58.91 N 121.64 E 1444.01 1490.86 63.29 N 127.13 E 1475.56 1522.41 69.13 N 133.99 E 1508.01 1554.86 75.28 N 141.20 E 1531.79 1578.64 79.81 N 146.56 E 1570.55 1617.40 87.16 N 155.28 E 1602.11 1648.96 93.19 N 162.30 E 1625,56 1672.41 97.83 N 167.44 E 1660.84 1707.69 105.33 N 175.07 E 1710.95 1757.80 116.46 N 165.83 E 1752.82 1799,67 125.81 N 194.87 E 1781,69 1828.54 132.49 N 201.29 E 1798.02 1844.87 136.37 N 205.05 E 1889.72 1936.57 159.92 N 228.42 E 1980.04 2026.89 186.22 N 254.67 E 2065.78 2112.63 213.76 N 281.28 E 2154.10 2200.95 244.85 N 311.15 E 2236.65 2283.50 275.24 N 343.26 E Survey Report for P2-14PB1 Your Ref: API-500292288870 Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fi) (fi) (°/100fi) (fi) 5998579,01N 681446,22 E 44.31 5998584,34N 681454.89 E 0.762 53.77 5998586.11N 681457.72 E 1.379 56.88 5998589,72 N 681463.36 E 2,623 63.15 5998593.31N 681468.52 E 3.451 69.11 5998597.59 N 681474.59 E 2.529 76.18 5998601.11N 681479,56 E 2.503 81.97 5998604.57 N 681484.25 E 1.261 87.55 5998609.06 N 681490,20 E 2.176 94.71 5998613.21N 681495.78 E 0.898 101,38 5998616.25 N 681500.04 E 2.239 106.35 5998620.96 N 681506.72 E 3.433 114.13 5998625.57 N 681512.84 E 4.162 121,49 5998630.08 N 681518.23 E 3.773 128.32 5998636.08 N 681524.94 E 1.119 137.15 5998642.40 N 681532.00 E .1.233 146.44 5998647.06 N 681537.25 E 0.286 153.32 5998654.62 N 681545.78 E 0,087 164.48 5998660.82 N 681552.66 E 0.974 173.57 5998665.58 N 681557.68 E 2.251 180.39 5998673,26 N 681565.13 E 2.940 191.00 5998684.65 N 681575.62 E 0.080 206.40 5998694.22 N 681584.43 E 0.479 219.34 5998701.05 N 681590.68 E 2,856 228.55 5998705.03 N 681594,35 E 1,889 233,94 5998729.14 N 681617,14 E 2.982 266.89 5998756.06 N 681642.75 E 2.091 303.79 5998784.24 N 681668.68 E 1.624 341.88 5998816,05 N 681697.78 E 2.616 364.78 5998847.21 N 681729.15 E 2.874 428.52 Comment Tie-on Survey Alaska State Plane Zone 4 Point Mclntyre Pad 2 Continue~.. t7 August, 1998 - 11:52 .2 - DrillQuest Shared Services Drilling Point Mclntrye Measured Depth Incl. Azim. (ft) 2448.67 30.430 50.940 2540.83 31.660 50.640 2640.55 32.030 54.180 2732.85 32.800 53.580 2825.28 34.070 52.290 2918.89 35.160 51.150 3014.82 35.260 48.670 3111,30 36.730 50.080 3206.09 38,270 53.250 3300.89 40,110 53.820 3394.61 42.490 53.710 3492.53 46.020 54.300 3584.13 45.060 54.020 3680.33 44.940 51.740 3771.80 44.980 49.810 3866.83 44.450 46.990 3958.36 46.530 44.780 4055.65 51.030 42.830 4154.57 51.200 43.020 4250.03 51.730 42.090 4342.85 53.010 44.700 4437.85 55.370 44.790 4535.62 59.210 45,010 4626.25 62.920 43.840 4717.37 61.690 44.010 4814.09 61.860 42.840 4909.27 60.110 42.260 5004.26 58.170 42.630 5096.83 58.560 43.080 5194.10 60.570 42.880 Sperry-Sun Drilling Services Sub-Sea Ve~ical Local Coordinates Depth Depth Nothings Eastings (fi) (fi) (fi) (fi) 2319,76 2366.61 305.91N 379.55 E 2398.71 2445.56 335.96 N 416.38 E 2483.43 2530.28 368.03 N 458.06 E 2561.35 2608.20 397.20 N 498.02 E 2638.48 2685.33 427.90 N 538.65 E 2715.52 2762.37 460.85 N 580.39 E 2793.91 2840.76 496.46 N 622.69 E 2871.96 2918.81 533.37 N 665.73 E 2947,17 2994.02 569.13 N 71t.00 E 3020.64 3067.49 604.73 N 759.18 E 3091.05 3137,90 541.29 N 809.06 E 3161.17 3208.02 681.43 N 864.35 E 3225.33 3272.18 719.71N 917.35 E 3293.35 3340.20 760.76 N 971.58 E 3358.08 3404.93 801.62 N 1021.65 E 3425.62 3472.47 846.00 N 1071.64E 3489.78 3536.63 891.44N 1118.48 E 3553.88 3600.73 944.27 N 1169.08 E 3615,98 3662.83 1000.65 N 1221.52 E 3675.45 3722.30 1055,66 N 1272.02 E 3732.13 3778.98 1109.05 N 1322.53 E 3787.71 3834.56 1163.77 N 1376.76 E 3840.53 3887.38 1222.03 N 1434.82 E 3884.37 3931.22 1278.67 N 1490.32 E 3926.72 3973.57 1336.78 N 1546.28 E 3972.47 4019.32 1398.67 N 1604.86 E 4018.63 4065,48 1459.98 N 1661.15 E 4067.35 4114.20 1520.16 N 1716.17 E 4115.91 4162.76 1577.93 N 1769.78 E 4165.18 4212.03 1639.29 N 1826.95 E Survey Report for P2-14PB1 Your Ref: API-500292288870 Global Coordinates Dogleg Ve~ical Nothings Eastings Rate Section (fi) (fi) (°/t00ff) (fi) 5998878.76N 681764.68E 1.841 475.06 5998909.69N 681800.77E 1.345 521.44 5998942.77N 681841.66E 1.909 572.42 5998972.89N 681880.90E 0.904 620.05 5999004.57N 681920,77E 1.574 669.29 5999038.52 N 681961.70E 1.354 720.99 5999075,15 N 682003.13E 1.494 775.13 5999113.09 N 682045.26 E 1,749 830.75 5999149.94 N 682089.64 E 2,604 886.83 5999186.70 N 682136.94 E 1.978 944.59 5999224.46 N 682185.93 E 2.541 1004.17 5999265.93 N 682240,22 E 3.629 1069,89 5999305.49 N 682292.28 E 1.071 1132.74 5999347.84 N 682345.50 E 1.680 1198.53 5999389.91N 682394.56 E 1.492 1261.60 5999435.49 N 682443.46 E 2.161 1327.38 5999482,05 N 682489.18 E 2.851 1392.05 5999536.09 N 682538.49 E 4.864 1464.86 5999593.73 N 682589.54E 0.228 1541.59 5999649.95 N 682638.69 E 0.943 1616.04 5999704.55 N 682687.89 E 2.619 1689,24 5999760.57 N 682740.77 E 2.485 1765.76 5999820.22 N 682797.40 E 3.932 1847.45 5999878.19 N 682851.51E 4.247 1926.28 5999937.54N 682906.05 E 1.360 2006.55 6000000.94 N 682963.11 E 1.080 2091.41 6000063.60 N 683017.89 E 1.914 2174.40 6000125.09 N 683071,44E 2.070 2255.71 6000184.15 N 683123.62 E 0.591 2334.26 6000246.87 N 683179.29 E 2.074 2417.83 Comment Alaska State Plane Zone 4 Point Mclntyre Pad 2 Continued... 17 August, 1998.11:52 .3 - DrillQuest Sperry-Sun Drilling Services Survey Report for P2-14PB1 Your Ref: API-500292288870 Shared Services Drilling Point Mclntrye Alaska State Plane Zone 4 Point Mclntyre Pad 2 Measured Sub-Sea Ve~ical Depth Incl. Azim. Depth Depth (~) (~) (~) 5288.26 61.720 42.940 4210.62 4257.47 5380.14 61,610 45.180 4254.23 4301,08 5473.73 61,370 45,330 4298.90 4345.75 5565.23 60.780 46.430 4343.16 4390.01 5659.45 61.290 47.820 4388.79 4435.64 5754.42 59.650 47.480 4435.59 4482.44 5849.10 60,070 48.220 4483.14 4529,99 5946.26 62.910 50.500 4529.51 4576.36 6036.19 63.020 48,780 4570.39 4617.24 6130.19 61.090 48.850 4614.44 4661.29 6224.54 60.310 46.810 4660.61 4707.46 6319,50 62.630 45,540 4705.97 4752.82 6414.84 65.000 44.270 4748.04 4794.89 6506.11 63.460 45,640 4787.72 4834.57 6603.09 63.770 45.350 4830.82 4877.67 6680.48 62.660 45.320 4865.69 4912.54 6750.46 61.490 45.570 4898.46 4945.31 6842.25 61.600 45.870 4942.20 4989.05 6939,03 61.320 44.840 4988.44 5035.29 7036.57 61.230 45.730 5035.32 5082,17 7128,56 62.390 45.230 5078,77 5125.62 7219.16 63.330 44.840 5120.10 5166.95 7318.05 63.810 45.640 5164.12 5210.97 7408.62 65.040 45.270 5203.21 5250.06 7506,03 65.490 44.140 5243.97 5290.82 7600.75 65.440 43.640 5283.31 5330.16 7697,69 65.370 43.520 5323~65 5370.50 7790.40 65.850 43.410 5361.94 5408.79 7887.16 65.880 43.680 5401.50 5448.35 7978.90 65.650 43.050 5439.16 5486,01 Local Coordinates Nothings 1699.69 N 1757.80 N 1815.69 N 1871.44N 1927.53 N 1983.19 N 2038.14 N 2093.72 N 2145.59 N 2200.27 N 2255.49 N 2313.27 N 2373,86 N 2432.03 N 2492.93 N 2541.49 N 2584.87 N 2641.22 N 2700.96 N 2761.14 N 2817.99 N 2874.96 N 2937.32 N 2994.62 N 3057.50 N 3119.60 N 3183.46 N 3244.74 N 3308.74 N 3369.56 N Eastings (fi) 1883.10 E 1939.33 E 1997,74 E 2055.23 E 2115.64 E 2176.71E 2237,42 E 2302.21E 2363.24 E 2425.73 E 2486.71E 2546.89 E 2607.27 E 2665,34 E 2727.30 E 2776.43 E 2820,49 E 2878.27 E 2938.76 E 2999.54E 3057,35 E 3114.39 E 3177.27 E 3235.49 E 3297.73 E 3357.46 E 3418.23 E 3476.31E 3537.14 E 3594.59 E Global Coordinates Dogleg Ve~ical Nothings Eastings Rate Section (fi) (fi) (°/100fi) (fi) 6000308.62N 683233.96E 1.223 2500.01 6000368.08N 683288.76E 2.149 2580.45 6000427.37N 683345.75E 0.293 2662.06 6000484.50N 683401.87E 1.234 2741.42 6000542.04N 683460.90E 1.400 2822.85 6000599.17N 683520.60E 1.755 2904.35 6000655.57N 683579.95 E 0.808 2985.06 6000712.70N 683643.37 E 3.577 3068.79 6000766.04 N 683703.13 E 1.708 3147.29 6000822.22 N 683764.28 E 2,054 3228.90 6000878.91N 683823.90 E 2,059 3310.01 6000938.13 N 683882.65 E 2.711 3392.61 6001000.18 N 683941.55 E 2.758 3477.57 6001059.73 N 683998.19 E 2.162 3559,19 6001122,12 N 684058.65 E 0.417 3545.35 6001171.86 N 684106.59 E 1.435 3713.90 6001216.30 N 684149.58 E 1.701 3775.23 6001274.03 N 684205.98 E 0.311 3855.23 6001335.22 N 684265.00 E 0.979 3939.58 6001396.86 N 684324.30 E 0.805 4024.46 6001455.09 N 684380.71E 1,349 4104.88 6001513.44N 684436.35 E 1.106 4184,92 6001577.30 N 684497.70 E 0,872 4272.80 6001636.00 N 684554.51E 1.407 4353.84 6001700.37 N 684615.20 E 1.150 4441.73 6001783.90 N 684673.42 E 0.483 4527.47 6001829.21N 684732.61E 0.134 4615.22 6001891.89 N 684789,19 E 0.529 4699.30 6001957.35 N 684848.45 E 0.257 4787.21 6002019.54N 684904.40 E 0.675 4870.52 Comr~ent Continued... 17 August, 1998 - f1:52 - 4 - DrillQuest Sperry-Sun Drilling Services Survey Report for P2-14PBI Your Ref: API-500292288870 Shared Services Drilling Point Mclntrye Alaska State Plane Zone 4 Point Mclntyre Pad 2 Measured Sub-Sea Ve~ical Depth Incl. Azim. Depth Depth (~) (fi) 8072.77 64.760 43.020 5478.53 5525.38 8165.61 64.140 42.380 5518.57 5565.42 8263.06 64.020 42.500 5561.16 5608.01 8359.64 64.170 42.780 5603.36 5650.21 8452.98 63.460 41.230 5644.55 5691.40 8547.23 63.380 41.450 5686.72 5733.57 8640.30 64.120 41.350 5727.88 5774.73 8736.40 65.260 41.120 5768.97 5815.82 8824.45 64.380 40.090 5806.43 5853.28 8922.61 64.370 40.480 5848.88 5895.73 9016.42 64.500 39.950 5889.36 5936.21 9109.50 63.790 39.390 5929.96 5976.81 9205.58 63.380 39.640 5972.70 6019.55 9300.90 61.910 40.280 6016.50 6063.35 9397.53 61.830 39.690 6062.06 6108.91 9490.75 61.510 40.040 6106.29 6153.14 9586.15 61.660 39.990 6151.69 6198.54 9678.69 62.030 41.200 6195.36 6242.21 9770.71 62.120 39.720 6238.45 6285.30 9868.93 62.690 40.990 6283.95 6330.80 9965.05 62.870 41.890 6327.92 6374.77 10057.33 62.880 39.110 6370.00 6416.85 10153.81 63.290 39.240 6413.67 6460.52 10248.30 63.150 38.710 6456.25 6503.10 10342.12 63.300 38.890 6498.51 6545.36 10430.22 63.420 38.730 6538.01 6584.86 10523.11 63.660 38.110 6579.40 6626.25 10620.18 64.450 37.800 6621.87 6668.72 10713.88 65.030 37.770 6661.86 6708.71 10811.12 64.050 37.350 6703.66 6750.51 Local Coordinates Nothings 3431.85 N 3493.40 N 3558.08 N 3621.99 N 3684.23 N 3747.51N 3810.12 N 3875.45 N 3935.95 N 4003.46 N 4068.09 N 4132.56 N 4198.94 N 4263.83 N 4329.13 N 4392.11N 4456.37 N 4518.32 N 4580.18 N 4646.51N 4710.59 N 4773.03 N 4839.72 N 4905.30 N 4970.58 N 5031.94 N 5097.09 N 5165.92 N 5232.89 N 5302.49 N Eastings 3652.74 E 3709.54 E 3768.69 E 3827.54E 3883.59 E 3939.27 E 3994.47 E 4051.73 E 4103.59 E 4160.82 E 4215.45 E 4268.93 E 4323.68 E 4378.05 E 4432.81E 4485.40 E 4539.35 E 4592.44 E 4645.20 E 4701.56 E 4758.14 E 4811.47 E 4865.81E 4918.87 E 4971.35 E 5020.71E 5072.38 E 5126.07 E 5177.99 E 5231.51E Global Coordinates Dogleg Ve~ical Nothings Eastings Rate Section (fi) (fi) (°/100fi) (fi) 6002083.22N 684961.03E 0.949 4955.43 6002146.14N 685016.32E 0.913 5038.93 6002212.24 N 685073.88E 0.166 5126.33 6002277.56N 685131.t6E 0.304 5212.95 6002341.14N 685185.68E 1.673 5296.51 6002405.75 N 685239.80E 0.225 5380.67 6002469.69N 685293.47E 0.801 5464.01 6002536.39N 685349.13E 1.206 5550.76 6002598.12N 685399.51E 1.456 5630.37 6002667.01N 685455.08E 0.358 5718.82 6002732.94N 685508.13E 0.528 5803.39 6002798.69 N 685560.02 E 0.935 5887.12 6002866.38N 685613.14 E 0.486 5973.15 6002932.57N 685665.92 E 1.653 6057.76 6002999.18 N 685719.08 E 0.545 6142.94 6003063.42 N 685770.13 E 0.477 6224.95 6003128.97 N 685822.51E 0.164 6308.82 6003192.19 N 685874.08 E 1.220 6390.33 6003255.31N 685925.32 E 1.424 6471.57 6003322.99 N 685980.06 E 1.284 6558.55 6003388.42 N 686035.05 E 0.853 6643.88 6003452.14 N 686086.85 E 2.681 6725.94 6003520.13 N 686139.56 E 0.442 6811.95 6003586.98 N 686191.01E 0.522 6896.30 6003653.51N 686241.90 E 0.234 6980.05 6003716.06 N 686289.75 E 0.212 7058.80 6003782.44N 686339.83 E 0.651 7141.95 6003852.55 N 686391.83 E 0.863 7229.24 6003920.76 N 686442.10 E 0.620 7313.98 6003991.64 N 686493.92 E 1.081 7401.77 Comment Conb'nued... 17 August, 1998.11:52 - 5 - DrillQuest Shared Services Drilling Point Mclntrye Measured Sub-Sea Ve~ical Depth Incl. Azim. Depth Depth (~) (fi) (fi) 10902.32 64.520 36,460 6743.23 6790.08 10996.26 64.730 36.440 6783.49 6830.34 11092.47 64.880 36.280 6824.44 6871.29 11186.18 64.940 36,130 6864.18 6911.03 11282,19 65.340 36.090 6904.54 6951.39 11376.46 65.110 37.260 6944.05 6990.90 11469.24 65.510 37.350 6982.80 7029,65 11562.12 65.680 37.330 7021.18 7068.03 11660,31 65,510 37,820 7061.75 7108.60 11756.63 65.510 38.060 7101.68 7148.53 11847.65 65.360 37.720 7139.52 7186.37 11944.76 64.840 36.670 7180.41 7227.26 12043.31 65,030 36.850 7222.16 7269.01 12133.66 64.760 37.760 7260.49 7307.34 12229.90 64,020 38.310 7302.09 7348.94 12325.31 62.940 38.390 7344.69 7391,54 12416.97 61.950 38.490 7387.09 7433.94 12510.96 61.400 38.790 7431.69 7478.54 12601,95 61.440 38,530 7475.22 7522.07 12685.17 61.660 38.530 7514.86 7561,71 12779~89 61.920 38.690 7559.64 7606.49 12812.27 61.280 38.990 7575.04 7621.89 12906.64 61.440 39.190 7620.27 7667.12 13000.37 61.540 38.760 7665.01 7711.86 13093.58 61.690 39.350 7709.32 7756.17 13188.28 61.690 38.280 7754.23 7801.08 13282.44 61.990 37.740 7798.67 7845.52 13381.43 62.540 37.480 7844.74 7891.59 13475.59 62.470 36.460 7888.21 7935.06 13573.99 61.850 36.060 7934.16 7981.01 Sperry-Sun Drilling Services Survey Report for P2-14PB1 Your Ref: API-500292288870 Local Coordinates Nothings (fi) 5368.19 N 5436.46 N 5506.57 N 5575.05 N 5645.43 N 5714.08 N 5781,13 N 5848.38 N 5919.24 N 5988.37 N 6053.70 N 6123.86 N 6195.38 N 6260.46 N 6328,81N 6395.76 N 6459.41N 6524.04 N 6586.43 N 6643.67 N 6708.89 N 6731.08 N 6795.36 N 6859.39 N 6923.07 N 6988.03 N 7053.44N 7122.85 N 7189.58 N 7259.74 N Eastings (fi) 5280.85 E 5331.27 E 5382.89 E 5433.02 E 5484.36 E 5535.48 E 5586.57 E 5637.87 E 5692.39 E 5746.29 E 5797.13 E 5850.38 E 5903.80 E 5953,38 E 6006.85 E 6059.82 E 6110.34 E 6162.00 E 6211.92 E 6257.50 E 6309.58 E 6327.45 E 6379.67 E 6431.48 E 6483.14 E 6535.40 E 6586.52 E 6639.99 E 6690.22 E 6741.69 E Global Coordinates Dogleg Ve~ical Nothings Eastings Rate Section (fi) (fi), (°/~OOff) (fi) 6004058.52N 686541.65E 1.019 7483.91 6004t28.00N 686590.40E 0.224 7568.75 6004199.34N 686640.30 E 0.217 7655.77 6004269.01N 686688,75E 0.158 7740.58 6004340,62N 686738.37E 0.418 7827.64 6004410.49N 686787.81E 1.153 7913.20 6004478.76N 686837.25 E 0.440 7997.49 6004547.23N 686886.91E 0.184 8082.06 6004619.40N 686939.70E 0.486 8171.47 6004689.82N 686991.90 E 0.227 8259.13 6004756.36 N 687041.14 E 0,378 8341.91 6004827.80 N 687092.67 E 1.117 8429.98 6004900.59 N 687144.34 E 0.254 8519.22 6004966.85 N 687192.33 E 0.960 8601.02 6005036.48 N 687244.12 E 0.926 8687.81 6005104.70 N 687295.45 E 1.134 8773.18 6005169.56 N 687344.41E 1.084 8854.44 6005235.42 N 687394.49 E 0.649 8937.17 6005299.00 N 687442.87 E 0.255 9017.07 6005357.33 N 687487.05 E 0.264 9090.24 6005423.80 N 687537,54 E 0.312 9173.71 6005446.41N 687554.86 E 2,138 9202.19 6005511.95 N 687605.50 E 0.252 9285.00 6005577.22 N 687655.74 E 0.417 9367.35 6005642.13 N 687705.85 E 0.580 9449.35 6005708.34 N 687756.51E 0.995 9532.71 6005774.97 N 687806.03 E 0.598 9615.73 6005845.66 N 687857.80 E 0.602 9703.34 6005913.59 N 687906.40 E 0.964 9786.85 6005984.97 N 687956.14 E 0.725 9873.81 Comment Alaska State Plane Zone 4 Point Mclntyre Pad 2 Continued... 17 August, 1998- 11:52 - 6- DrfllQuest Shared Services Drilling Point Mclntrye Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (rt) 13666.03 61.910 34.840 7977.54 8024.39 13762.37 61.780 34.540 8023.00 8069.85 13854.08 60.810 35.420 8067.05 8113.90 13949.30 60.690 35.260 8113.58 8160.43 14043.09 60.820 34.880 8159.40 8206.25 14138.73 61.010 34.590 8205.89 8252.74 14233.94 61.170 34.620 8251.92 8298.77 14328.04 61.400 34.550 8297.13 8343.98 14418.61 61.500 33.660 8340.41 8387.26 14511.22 61.560 33.570 8384.56 8431.41 14612.24 61.500 32.790 8432.72 8479.57 14699.67 61.950 29.660 8474.14 8520.99 14790.98 62.410 26.360 8516.76 8563.61 14887.72 62.900 21.820 8561.22 8608.07 14981.19 63.120 18.210 8603.65 8650.50 15078.06 63.750 15.520 8646.98 8693.83 15172.14 65.080 12.330 8687.61 8734.46 15264.93 63.750 9.700 8727.69 8774.54 15359.56 64.220 8.340 8769.20 8816.05 15456.43 64.260 6.320 8811.30 8858.15 15550.84 63.620 3.050 8852.79 8899.64 15645.77 63.750 1.66-0-- 8894.87 8941.72 15740.38 63.990 1.780 8936.54 8983.39 15834.43 63.990 1.980 8977.78 9024.63 15928.44 63.260 2.470 9019.54 9066.39 16024.49 62.710 2.190 9063.17 9110.02 16119.95 62.170 2.240 9107.34 9154.19 16207.00 62.170 2.240 9147.98 9194.83 Sperry-Sun Drilling Services Survey Report for P2-14PB1 Your Ref: API.500292288870 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (fi) (fi) 7325.87 N 6788.77 E 6006052.22 N 688001.60 E 7395.71N 6837.11E 6006123.22 N 688048.23 E 7461.62 N 6883.22 E 6006190.23 N 688092.73 E 7529.39 N 6931.27 E 6006259.14 N 688139.13 E 7596.36 N 6978.29 E 6006327.24 N 688184.51E 7665.05 N 7025.92 E 6006397.06 N 688230.45 E 7733.65 N 7073.25 E 6006466.79 N 688276.10 E 7801.59 N 7120.09 E 6006535.85 N 688321.28 E 7867.47 N 7164.70 E 6006602.79 N 688364.28 E 7935.26 N 7209.77 E 6006671.66 N 688407.69 E 8009.59 N 7258~37 E 6006747.14 N 688454.47 E 8075.42 N 7298.28 E 6006813.93 N 688492.77 E 8146.71N 7336.19 E 6006886.11N 688528.94 E 8225.13 N 7371.24 E 6006965.36 N 688562.08 E 8303.37 N 7399.74 E 6007044.27 N 688588.67 E 8386.28 N 7424.87 E 6007127.76 N 688611.78 E 8468.62 N 7445.27 E 6007210.58 N 688630.17 E 8550.76 N 7461.27 E 6007293.08 N 688644.17 E 8634.75 N 7474.60 E 6007377.37 N 688655.46 E 8721.27 N 7485.73 E 6007464.14 N 688664.49 E 8805.78 N 7492.66 E 6007548.79 N 688669.37 E 8890.80 N 7496.16 E 6007633.87 N 688670.80 E 8975.70 N 7498.71E 6007718.81N 688671.29 E 9060.18 N 7501.48 E 6007803.33 N 688672.01E 9144.34N 7504.75 E 6007887.54N 688673.23 E 9229.64N 7508.23 E 6007973.10 N 688674.64 E 9314.40 N 7511.50 E 6008057.72 N 688675.85 E 9391.33 N 7514.51E 6008134.69 N 688676.99 E Dogleg Rate (°/lOOff) 1.171 0.306 1.352 0.193 0.380 0.331 0.170 0.253 0.870 0.107 0.681 3.194 3.236 4.199 3.449 2.567 3.369 2.931 1.384 1.878 3.184 1.320 0.278 0.191 0.906 0.629 0.568 0.000 Vertical Section (fi) 9954.89 10039.67 10119.99 10202.96 10284.68 10368.11 1O451.29 10533.66 10613.01 10694.17 10782.63 10859.05 10938.52 11021.84 11100.96 11181.67 11259.02 11333.48 11407.75 11482.65 11553.38 11622.38 11690.70 11758.83 11827.02 11896.38 11964.89 12027.22 Comment Projected Survey Alaska State Plane Zone 4 Point Mclntyre Pad 2 Continued,.. 17 August, 1998- 11:52 - 7- DrillQuest Shared Services Drilling Point Mclntrye Sperry-Sun Drilling Services Survey Report for P2-14PBl Your Ref: API-500292288870 Alaska State Plane Zone 4 Point Mclntyre Pad 2 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths ar:e relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 38.170° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 16207.00ft., The Bottom Hole Displacement is 12027.67ft., in the Direction of 38.665° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (rt) 1000.00 997.36 13.99 N 53.90 E Tie-on Survey 16207.00 9194.83 9391.33 N 7514.51 E Projected Survey 17 August, 1998.11:52 - 8. DrillQuest Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 September 10, 1998 B.P. Exploration Petrotechnical Data Center Sharmaine Copeland, MB 3-3 900 East Benson Blvd. Anchorage, Alaska 99508 Re: PM2 Pad, Well No. P2-14 Point Mclntyre, Alaska Enclosed, please find one (1) original, four (4) copies, and two (2) disks of the completed survey of Well #P2-14. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, Lara Reader Operations Serving the Worldwide Energy Industry with Precision Survey Instrumentation Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 SURVEY REPORT ARCO ALASKA INC. PM2 PAD, WELL NO. P2-14 POINT MCINTYRE, ALASKA Gyro Orientation Survey Inside 5" DRILLPIPE Survey Date' 0t-JUNE, 1998 Job number: AK0598GOO473 RECEIVED SEP 29 1998 _Alaska Oil & Gas Cons. Commissi Anchorage mi ORIGINAL Serving the Worldwide Energy Industry with Precision Survey Instrumentation RECEIVED S EP I '~ BPXA PDC A Gyroda t a D i r e c t i ona i Survey for ARCO ALASKA INC. WELL: P2-14, 5"DP Location: PM2-PAD, POINT MCINTYRE, ALASKA Job Number: AK0598GO0473 Run Date: 1-Jun-98 14:12:39 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.400000 deg. N Azimuth Correction: Gyro: Bearings are Relative to True North Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a D i r e c t i ona i Survey ARCO ALASKA INC. WELL: P2-14, 5"DP Location: PM2-PAD, POINT MCINTYRE, Job Number: AK0598GO0473 ALASKA Page MEASURED I N C L AZIMUTH DOGLEG DEPTH SEVERITY feet deg. deg. deg./ 100 ft. VERTICAL SUBSEA CLOSURE DEPTH DEPTH DIST. AZIMUTH feet feet feet deg. HORIZONTAL COORDINATES feet 0.0 0.00 0.00 0.00 50.0 .00 336.36 .01 150.0 .30 316.72 .30 200.0 .50 310.97 .39 250.0 .30 30.32 1.06 0 50 150 200 250 .0 0.0 .0 50.0 .0 150.0 .0 200.0 .0 250.0 0.0 0.0 .0 336.4 .3 317.1 .6 314.9 .9 322.3 0.0 N 0.0 E .0 N .0 W .2 N .2 W .4 N .4 W .7 N .5 W 300.0 .90 80.29 1.48 350.0 1.70 98.38 1.79 400.0 2.50 107.03 1.71 450.0 2.90 100.30 1.02 500.0 3.20 92.43 1.03 30O 350 399 449 499 .0 300.0 .0 350.0 .9 399.9 .9 449.9 .8 499.8 .9 354.8 1.3 51.6 2.8 81.9 5.1 91.6 7.8 93.2 .9 N .1 W .8 N 1.0 E .4 N 2.8 E .1 S 5.1 E .4 S 7.7 E 550.0 4.30 88.53 2.25 600.0 5.00 85.27 1.50 700.0 6.60 77.29 1.79 800.0 6.20 66.57 1.26 900.0 5.80 63.18 .53 549 599 699 798 897 .7 549.7 .5 599.5 .0 699.0 .4 798.4 .9 897.9 11.0 92.3 15.1 90.8 25.1 86.8 35.9 82.3 46.0 78.4 .4 S 11.0 E .2 S 15.1 E 1.4 N 25.0 E 4.8 N 35.6 E 9.2 N 45.0 E 1000.0 5.80 60.74 .25 1100.0 6.60 60.24 .81 1175.0 8.12 57.55 2.08 1200.0 8.79 56.93 2.69 997 1096 1171 1195 .4 997.4 .8 1096.8 .1 1171.1 .9 1195.9 55.7 75.5 66.2 73.0 75.6 71.2 79.2 70.6 14.0 N 54.0 E 19.3 N 63.4 E 24.3 N 71.6 E 26.3 N 74.7 E Final Station Closure: Distance: 79.16 ft Az: 70.60 deg. m I:t I I__1__ I I~1 G S I::: F:t ~./I I-- I::: S 19-Aug-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 j- Re: Distribution of Survey Data for Well P2-14PB1 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 1,000.00' MD 'MD 16,207.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) NECEIVED) AUG 2. 6 1998 A~or~e 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Division of Dresser Industries, Inc. TONY KNOWLE$, GOVERNOR ALASK& OIL AND GAS CONSERVATION CO~IISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 June 24, 1998 Lov,'cll Crane Drilling Engineering Supcvisor ARCO Alaska. Inc. P O Box 196612 Anchorage, AK 99519-6612 ae~ Point Mclntvrc P2-14 Rev. ARCO Alaska. Inc. Permit No: 98-105 Sur Loc: 16'SNL, lI57'EWL. Scc. 14. T12N. R14E. UM Btmhole Loc: 669'SNL. 4005'EWL. Scc. 17 T12N. R14E. UM Dcar Mr. Crane: Encloscd is thc approvcd rcviscd application for permit to drill the above referenced well. Thc provisions of thc original approvcd permit datcd Max- 22. 1998, arc in effect for this revision. Robert N. Christcnson Commissioncr BY ORDER OF THE COMMISSION dlf/Enclosurcs CC~ Dcpartmcnt of Fish &Gamc. Habitat Scction W/o cnct Dcpartmcnt of Environmcntal Conscrvation w/o cncl STATE OF ALASKA ALASKA', ....~ AND GAS CONSERVATION COM~ilSSION PERMIT TO DRILL 20 AAC 25.005 REVISED: 06/23/98 la. Type of work [] Drill [] Redrill [lb. Type ofwell I--IExploratory I--IStratigraphic Test [~Development Oilj [] Re-Entry [] DeepenI []Service [] Development Gas I--ISingle Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field an~l Pool ARCO Alaska Inc. Plan RTE = 49.0 Point Mclntyre 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL365548 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 16' SNL, 1157' EWL, SEC. 14, T12N, R14E, UM Point Mclntyre At top of productive interval 8. Well Number Number U-630610 2095' SNL, 3396' EWL, SEC. 1, T12N, R14E, UM P2~14 At total depth 9. Approximate spud date Amount $200,000.00 669' SNL, 4005' EWL, SEC. 1, T12N, R14E, UM 06/24/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL377054, 669'I No Close Approach 3601.1 16937' MD / 9167' TVD 16. To be completed for deviated wells 117. Anticipated pressure (see 20 AAC 25.035 (e) (2)} Kick Off Depth 300' MD Maximum Hole Angle 88° Maximum surface 3520 psig, At total depth (TVD) 8800'/4400 psig 18. Casing Program Specifications Setting Depth Size Top ' Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 133# "-40 BTC 80' 49' . 49' 129' 129' 260 sxArctic Set (Approx.) 13-1/2" 10-3/4" 45.5# L-80 BTC 6679' 48' .~ 48, 6727' 4949' 2072 sxColdset III, 757 sx Class 'G, _ 9-5/8" 7-5/8" 29.7¢ L-80 BTCM 15333' 47' 47' 15380' 9004' 301 sx Class 'G' 6-3/4" 4-1/2" 12.6# 13CR NSCT 1707' 15230' 8963' 16937' 9167' 377 sx Class 'G' , 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate PeRoration depth: measured true vertical ...,'~..:, 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Greif Hobbs, 564-4191 Prepared By Name/Number: Carol Withey, 564-4114 21. I hereby certify that the/,ff)regoing is true,~nd correct to the best of my knowledge Signed a~t57~ .~ /~....._._~ LowellCr , Titlo Drilling Engineering Supervisor Date i,,' Commission Use Only Permit Number I APl Number Approval Date I See cover letter 98-105I 50-029-22888 05/22/98I for other requirements Conditions of Approval: Samples Required []Yes [~]No Mud Log Required []Yes I~lNo Hydrogen Sulfide Measures ~[]Yes [] No Directional Survey Required [~Yes [-INo Required Working Pressure for BOPE 1--12M; 1--13M; 1~5M; E]10M; []15M Oth~IGINAL SIGNED BY by order of Approved By Robert N. Christensorl Commissioner the commission Date5 Form 10-401 Rev. 12-01-85 Submit In Triplicate Well Name: I P2-14 Type of Well (producer or injector): I Producer Surface Location: 16' FNL, 1157' FWL, T 12N, R 14E, S 14 Target Location' 2095' FNL, 3396' FWL, T 12N, R 14E, S 1 (Top Kuparuk) Bottom Hole 669' FNL, 4005' FWL, T 12N, R 14E, S 1 Location: I AFENumber: 12B0224 I Date:Estimated Start 16/24/98 I Rig: I NABORS33E IDays to complete 14 I MD.' 116937' I I TV~.' 19167' I RTE._ 149.0 JWell Design (conventional, slimhole, etc.): Slimhole 75/8" Int. Casing, 4-1/2" 13 Cr liner and tbg Formation Markers: Formation Tops MD TVD Base of 1818 1784 Permafrost SV4 4292 3719 SV1 ~(T3) 6294 4739 10 3,4" Casing 6727 4949 10 3/4" csg shoe below SVl & above Point K-15 K15 (Ugnu) 7205 5184 West Sak 11506 7109 9.5 ppg minimum mud weight required. 7 5/8" Casing 15380 9004 Intermediate String Shoe HRZ 15138 8936 K-5/HRZ same depth Kalubik 15340 8996 Kuparuk 15369 9001 OWC 16797 9118 TD 16937 9167 4-1/2" liner shoe. 140' MD below OWC. Casing/Tubing Proc~ ram: Hole csg/Tbg Wt/Ft Grade Conn Length Top Btm Size O.D. MD/TVD MD/TVD 30" 20" 133# H40 BTC 80' 49/49' 129 '/129' 13-1/2" 10 3/4" 45.5# L-80 BTC 6679' 48/48' 6727'/4949' 9 7/8" 7 5/8" 29.7# L-80 BTCM 15333' 47/47' 15380'/9004' 6 3/~ 4 1/2 12.6 13 Cr NSCT 1707' 15230/8963 16937'/9167' Tubing 4 1/2" 12.6# 13-Cr NSCT ~ 46'/46' 15230'/8963' Mud Program: Production Mud Properties: LSND 19-7/8" hole section Density(ppg) FunnelVis YieldPoint rlosecgel lOmingelI 8.8-9.9 40-55 18-22 5-15 < 30 pH 9.O-9.5 I Fluid Loss 4-6cc Production Mud Properties: 3% KCL 19-7/8" Pilot Hole section, 6 3A Prod. Bore, GEM I Density (ppg) Plastic Vis Yield Point 10 sec 10 min pH Fluid Loss gel gel 10.3-10.6 8-15 15-25 8-15 < 30 9.0-9.5 <5cc Cement Data: Int. Casing Lead:Sxs/Wt/Yield Tail: Sxs/Wt/Yield Comments 75/8" none 301/15.8/1.14 Class "G". Volume based on cement 1000' above the ~ shoe with 50% excess + 80' shoe. Liner Lead:Sxs/Wt/Yield Tail:Sxs/Wt/Yield Comments 4 1/2" none 377/15.8/1.19 Class "G". Volume based on cement across entire liner with 50% excess + 80' shoe+150' lap. Logging Program: I Open Hole Logs: JCased Hole Logs: MWD/LWD GR/RES to 15380' MD (9 7/8" hole). MWD/LWD GR/RES to 6 3/4" TD. CBT-CET (contingent on cmt job mechanics). Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. BOPE and drilling fluid system schematics on file with AOGCC. Directional: IMaximum Hole Angle: Close Approach Wells: 88 degrees Drilling and Completion Scop6-' ]. :2. o . . o 9. 10. Plug Current open 9 7/8" hole back to 13,300' with balanced, 17 ppg densified kick-off plug. Kick-off and drill out with 9 7/8" assembly with GR/Res from 13,865' MD to 15,380' MD (top Kuparuk Sand) Run and Run/cement 7 5/8" long string to 15380' MD. PT to 3500 psi, record on chart for 30 min. RIH with 6 3A" bit and MWD/LWD GR/RES. Drill out 20', perform LOT. Drill 6 3A" hole to the target, laying out at -88 degrees and drilling towards the North Geo-Steer as necessary to stay in the upper Kuparuk. Drill to TD of the well, 140' MD below the OWC. POOH to run liner. Run and cement 4 1/2" 13 Cr liner to TD. Use inner string cement job. Run ZXP packer on separate run. Perforate liner w/500 psi underbalance and DPC 2.75" perf guns. Kill well. Run 4-1/2" 13 Cr tubing with 7 5/8"x4-1/2" packer, 4-1/2" TRSSSV, and 4-1/2"x1" GLMs. Secure well, RDMO. Drilling Hazards/Contingencies · The original reservoir pressure is 4377 psi at 8800' ss. The expected reservoir pressure is 4400 psi at 8800' ss based on a recent P2-33B static. Formation pressures above this are not expected in this well. The 10.3 ppg mud will overbalance the anticipated pressure by 200 psi. · Coal stringers/SV Sands in the lower Ugnu have caused stuck pipe. · No major instances of lost circulation problems have occurred on Pt Mac 2 wells. Disposal · Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough. GH O6/23/98 TREE: 4 1/16" - 5M Chrome WELLHEAD: 11" x 11" - 5M FMC P2-14 RT-GL - 33.8' GL-SL = 11.6' 10 3~4", 45.5 #Iff, L80, BTC IKOP: 300' Max Angle: 91° @ 16230' 4-1/2" 12.6# 13Cr, NSCT 3.958" ID 0.0152 bbl/ft Capacity 6727' GAS LIFT MANDRELS 4 1/2" X 1" MD TVD Type 1 TBD TBD 41/2" x 1 2 Camco 3 4 MBX 5 SPM 6 7 BAKER Tie Back Sleeve ZXP Packer BAKER HMC Hanger 15,215' I 15,230'I 7 5/8" x 4-1/2" 9 Cr Packer 4-1/2" X Nipple (3.813" ID) 4-1/2" XN Nipple (3.725" ID) 4-1/2" Mule Shoe 15,290' 15,200' I 15,210' I 15,215'I 7 5~8", 29.7 #/FT, L80, BTC-M Plug Back Depth 4 1/2" 12.6#/FT, 13 Cr, NSCT (3.958" ID, 0.01522 bbl/ft) I $,3so' I 16,857' I I 1 , 37' i Date 6/23/98 Rev By Comments GH Proposed Completion Perforation Summary Ref Lo( Size Interval ~PF Open/Sqzd Point Mclntyre WELL: P2-14 APl NO: 50-029- Shared Services Drilling Sperry-Sun Drilling Services Proposal Report for P2-14 St Wp2 Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 13865.00 60.560, 35.173 8070.37 8119.47 13880.00 60.562 35.862 8077.74 8126.84 13900.00 59.764 35.785 8087.69 8136.79 14000.00 55.779 35.376 8141.01 8190.11 14100.00 51.796 34.927 8200.07 8249.17 14200.00 47.814 34.426 8264.60 8313,70 14300.00 43.835 33.858 8334.27 8383.37 14400.00 39.859 33.200 8408.75 8457.85 14500.00 35.887 32.424 8487.67 8536.77 14547.58 34.000 32.000 8526.67 8575.77 14600.00 37.138 31.623 8569.31 8618.41 14700.00 43.126 31.036 8645.73 8694.83 14800.00 49.116 30.567 8715.01 8764.11 14900.00 55.109 30.176 8776.39 8825.49 15000.00 61.102 29.838 8829.21 8878.31 15100.00 67.096 29.537 8872.87 8921.97 15138.12 69.381 29.430 8887.00 8936.10 15200.00 73.090 29.262 8906.90 8956.00 15225.02 74.590 29.196 8913.87 8962.97 15300.00 74.590 29.196 8933.79 8982.89 15349.71 74.590 29.196 8947.00 8996.10 15359.47 74.590 29.196 8949.59 8998.69 15368.77 75.424 28.771 8952.00 9001.10 15400.00 78.230 27.365 8959.12 9008.22 15500.00 87.255 23.018 8971.74 9020.84 15505.99 87.797 22.762 8972.00 9021.10 15600.00 87.797 22.762 8975.61 9024.71 15700.00 87.797 22.762 8979.46 9028.56 15800.00 87.797 22.762 8983.30 9032.40 15900.00 87.797 22.762 8987.14 9036.24 7484.91N 6889.19 E 7495.54 N 6896.78 E 7509.61 N 6906,93 E 7578.39 N 6956.15 E 7644.34 N 7002.60 E 7707.14 N 7046.06 E 7766.48 N 7086.31 E 7822.07 N 7123.17 E 7873.65 N 7156.44 E 7896.70 N 7170.97 E 7922.62 N 7187.04 E 7977.66 N 7220.52 E 8039.55 N 7257.40 E 8107.62 N 7297.27 E 8181.11N 7339.71E 8259.22 N 7384.23 E 8290.04 N 7401.65 E 8341.10 N 7430.36 E 8362.07 N 7442.10 E 8425,17 N 7477.36 E 8467.01 N 7500.74 E 8475.23 N 7505.33 E 8483.08 N 7509.68 E 8509.91N 7523.98 E 8599.58 N 7566.12 E 8605.09 N 7568.45 E 8691.71 N 7604.79 E 8783.86 N 7643.45 E 8876.00 N 7682.11E 8968.15 N 7720.77 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°/100ft) (ft) 6006213.66 N 688098.13 E 10155.78 6006224.47 N 688105.46 E 4.000 10168.81 6006238.78 N 688115.27 E 4.000 10186.13 6006308.74 N 688162.80 E 4.000 10270.52 6006375.80 N 688207.64 E 4.000 10350.98 6006439.63 N 688249.56 E 4.000 10427,10 6006499.93 N 688288.36 E 4.000 10498.51 6006556.40 N 688323.86 E 4.000 10564.87 6006608.77 N 688355.87 E 4.000 10625.86 6006632.17 N 688369.83 E 4.000 10652.90 6006658.46 N 688385.27 E 6.000 10683.13 6006714.30 N 688417.40 E 6.000 10746.92 6006777.07 N 688452.77 E 6.000 10818.18 6006846.09 N 688490.98 E 6.000 10896.10 6006920.59 N 688531.62 E 6.000 10979.84 6006999.76 N 688574.23 E 6.000 11068.49 6007030.99 N 688590.90 E 6.000 11103.37 6007082.74 N 688618.37 E 6.000 11161.07 6007103.98 N 688629.59 E 6.000 11184.72 6007167.92 N 688663.31 E 0.000 11255.89 6007210.31 N 688685.66 E 0.000 11303.06 6007218.64 N 688690.05 E 0.000 11312.33 6007226.60 N 688694.21 E 10.000 11321.17 6007253.77 N 688707.86 E 10.000 11350.98 6007344.43 N 688747.81 E 10.000 11447.05 6007350.00 N 688750.00 E 10.000 11452.79 6007437.48 N 688784.23 E 0.000 11542.84 6007530.53 N 688820.64 E 0.000 11638.62 6007623.59 N 688857.06 E 0.000 11734.40 6007716.64 N 688893.47 E 0.000 11830.19 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment THRZ Kalubik Kuparuk Target: P2-14 St HP, 100.00 Radius., Geological Continued... 23 June, 1998- 14:12 - 1 - DrillQuest Sperry-Sun Drilling Services Proposal Report for P2-14 St Wp2 Shared Services Drilling Point Mclntrye Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°/100ft) (ft) 16000.00 87.797 22.762 8990.99 9040.09 9060.29 N 7759.44 E 16100.00 87.797 22.762 8994.83 9043.93 9152.43 N 7798.10 E 16200.00 87.797 22.762 8998.67 9047.77 9244.58 N 7836.76 E 16300.00 87.797 22.762 9002.52 9051.62 9336.72 N 7875.42 E 16400.00 87.797 22.762 9006.36 9055.46 9428.87 N 7914.08 E 16494.65 87.797 22.762 9010.00 9059.10 9516.08 N 7950.67 E 16500.00 87.476 22.762 9010.22 9059.32 9521.01 N 7952.74 E 16600.00 81.476 22.762 9019.84 9068.94 9612.75 N 7991.23 E 16601.06 81.413 22.762 9020.00 9069.10 9613.72 N 7991.64 E 16700.00 75.476 22.762 9039.81 9088.91 9703.06 N 8029.13 E 16797.41 69.632 22.762 9069.00 9118.10 9788.72 N 8065.06 E 16800.00 69.632 22.762 9069.90 9119.00 9790.96 N 8066.01 E 16900.00 69.632 22.762 9104.71 9153.81 9877.40 N 8102.28 E 16937.41 69.632 22.762 9117.73 9166.83 9909.74 N 8115.85 E 6007809.70 N 688929.88 E 0.000 11925.97 6007902.75 N 688966.30 E 0.000 12021.76 6007995.81N 689002.71E 0.000 12117.54 6008088.87 N 689039.12 E 0.000 12213.32 6008181.92 N 689075.53 E 0.000 12309.11 6008270.00 N 689110.00 E 0.000 12399.77 6008274.98 N 689111.95 E 6.000 12404.89 6008367.63 N 689148.20 E 6.000 12500.26 6008368.60 N 689148.58 E 6.000 12501.26 6008458.83 N 689183.89 E 6.000 12594.14 6008545.33 N 689217.74 E 6.000 12683.17 6008547.59 N 689218.62 E 0.000 12685.50 6008634.89 N 689252.79 E 0.000 12775.36 6008667.55 N 689265.57 E 0.000 12808.98 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to RKB 37+12.1. Northings and Eastings are relative to Well Reference. · ' The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 39.317° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 16937.41ft., The Bottom Hole Displacement is 12808.98ft., in the Direction of 39.317° (True). Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment Target: P2-14 St Toe, 100.00 Radius., Geological WOC encounter in PH WOC 23 June, 1998 - 14:12 - 2 - DrillQuest Shared Services Drilling Well ' P2-14 St Wp2 I DrillQuesf FOR PERMITTING ONLY 9500 - 9OO0 85OO Scale: linch = 500ft Eastings 70100 75100 P2.14 St Toe - Circle 9059.10 TVD - 9516.08 N, 7950.67 E 91 (X).O0 9000.00 8otoo 00.00 HP. Circle TVD - 8605.09 N, 7568.45 E 9000.00 8900.00 00 8500.00 ~oo.oo~® -oo / 8250 - ~4~oo.oo -'~.~ )' 8500.00 ~4~oo.oo ~ ~ ~oo.oo 14700.00 [ ~ ~ Scale: linch = 500~ Eastin-s ~ ~ ................................................................................................................................................................ -Mfl.v~ach - P3P5. ~0 ~D I I I I I I 10250 ~ 0750 ~ 1250 11750 12250 12750 Scale: linch = 500ff Vedical Section Section ~imuth: 39.317° (True No~h) - 9500 -- 9000 - 8500 -- 7500 I 8000 Referenceis True No~h - 8000 6/20/98 Pt Mclntyre Well P2-14 Status 1:00 P.M. Following are notes of my conversation with Blair Wondzell 6/20/98 @11:15 a.m. The conversation accounted for a wide variety of issues since neither of us had a new directional plan for the potential new high angle bore that the asset would like to drill in an Easterly direction which is 180 degrees out from the originally permitted high angle production interval. Basis: As of late night 6/19/98, the resistivity logs taken in the Point Mclntyre P2-14 found a 45' TVD oil column where a 90' oil column was anticipated. The 45' column may not be large enough to allow completion of the well as a high angle producer that was permitted. The asset and partners agreed after review that the best approach may be to drill a pre-produced injector to the East with an 800' high angle section. Points of conversation: Blair noted that if there were any issues that required a spacing exception at a later date, the well could not be produced or injected into until a spacing exception was applied for and approved. There was also no guarantee that an exception would be approved. I assured Blair, and have since confirmed with the asset that this will not be an issue. The fact that the well could now be an injector was a non-issue at this point. Paperwork could follow at a later date dealing with this. The well will stay a minimum of 500' away from the lease line to the North of the current Pilot hole location per Point Mclntyre Pool Rules (verified with asset). Current well plans design this "hardline" at 500'+150' or a total of 650" away from the boundary. Plan forward: 1. The rig is currently coming out of the hole after TD'ing the pilot hole per the original plan. 2. The rig will run in open-ended for laying a cement plug across the Kuparuk interval. The current plan at this point is that a continuous GR/Gyro with marked line for primary depth control will be run through the DP prior to laying the plug. If the HRZ is acting up, the plug will be laid, then the Gyro run above it. The Gyro will be run from TD to the surface. 3. The raw Gyro data will be E-Mailed to Mark Casillio with Sperry in town. The slope MWD folks will fax the data to Mike Garcia at 263-4894 along with corrected logs based on the gyro data. 4. The cement plug (15.8 ppg class G) will follow the original plan with a 100 bbl plug laid across the Kuparuk section from TD at 16,207' to -15,400' - 15,120' MD (depending on hole size). The top of Kuparuk is at 1~800' MD. This will give 400-680' coverage above the reservoir section. 5. After laying the plug, the rig will circulate at 15000' MD for 8-12 hours. The State AOGCC Inspector Chuck Scheve will be contacted to witness a tag of the plug prior to the laying of another plug or attempting to drill off from it. If the top of the plug is not found where it is expected (15,400' MD minimum), a second 15.8 ppg plug will be laid. 6. While the rig is completing cement operations, the asset and partners will come to grips with the plan forward for the well. The possibilities are: a) staying with the original plan as permitted with adjustments made for the thinner oil column, b) drilling a high angle well to the north or east for future injection in the area. These decisions are contingent on the Gyro data, pilot ~ hole logs, and the adjusted seismic information that results from it. 7. As required, densified cement will be laid on the first plug to adjust the kick- off point as determined by the final directional plan. 8. Required paperwork, directional plans and other information will be submitted to the state as finalized by the asset and partners. This is anticipated to be no later than Tuesday, 6/23/98 or earlier. GreCHobbs, '1~-33E ODE Blair Wondzell, A~Gcc Customer ,.. ?latforn ,,, slot/Well.. S~kRED SERVICES DRLG RAtD~ 33 /P2-14 HEA~URED DEPTH 0,00 50.0o 100.00 i50,00 200.00 ,L~GLE DEG 0.00 0,00 0,20 0.30 0.50 D, IRECTIO}~ DEG 0,00 336.40 305.90 316.70 311,00 TVD NORTHINGS EASTINGS FEET FEET 0.00 0,00 lq 0.00 E 50.00 0,00 N 0,00 E 100, O0 O, 05 N 0,07 W 150. O0 O. 20 N O. 23 W 200.00 0,44 N 0,49 W VERTICAL SECTION 0.00 0.00 -0.00 0.01 0.04 DOG LEG 0.00 0,00 0.40 0.22 0.41 250.00 300,00 350,00 400,00 0.30 0.90 1.70 2.50 2.90 30.30 80,30 98,40 107,00 100.30 250,00 0.69 N 0,58 W 0,18 1.07 299.99 0,87 N 0,13 W 0,60 1.49 349.98 0.83 N 0,99 E 1.26 1.78 399.95 0,40 N 2,77 E 2,03 i,72 449,89 0,14 S '§.05 £ 3,01 1,02 500,00 550,00 600.00 700.00 800.00 3,20 4,30 5.00 6,60 6.20 92.40 88.50 85.30 77,30 66,60 499,82 549,71 599.55 699.04 798,42 0,43 S 7.69 E 4,42 1.03 0,44 S 10,96 E 6,43 2.26 0.21 S 15.01 E 9.11 1.49 1.41N 24,96 E 16.53 1.79 4,82 N 35.52 E 25.74 1.26 900,00 1000,00 1095.00 1123,64 1174,71 5,80 5,80 6.50 6,88 8.19 63.20 60,74 59,00 59,92 57.77 897.87 997,36 1091.81 1120.25 1i?0.85 9.24 N 44.98 E 35.07 0.53 13.99 N 53,90 E 44,31 0.25 19,11 N 62,70 E 53,77 0,76 20,80 N 65,57 E 56,88 1,38 24.27 H 71.30 E 63.15 2,62 1215.50 1257.98 1290,00 1319,27 1354,96 9.55 D.59 11,33 11,67 12,44 55.41 56,95 55,33 54.61 54,12 1211.18 1253,01 1284,44 1313.13 1348.03 27.74 N 76.54 E 69,11 3,45 31.87 N 82.71 E 76.18 2.53 35,27 N 87.77 E 81.97 2,50 38.62 N 92,55 E 87,55 1,26 42.96 N 98,60 E 94,71 2,18 1387,13 1410.77 1445.54 t475,76 1502.06 12,53 13.01 14,20 15.19 15.99 55,39 56,40 56.01 52,95 49,99 1379.44 1402,49 ~436,29 1465,52 1490.86 46.97 N 104.28 49.90 N 108.61 54,45 N 115.41 58,9i ~ 121.64 63,29 N 127.13 101,38 106,35 114.13 121,49 128,32 0,90 2.24 3,43 4,16 3,77 1534.87 1568,67 1593,47 1633.87 1666.76 1691.21 1728.08 1780.52 16.09 16,47 16.40 16.39 16.32 16,56 17,19 17,15 49.22 49,83 49.79 49,91 48.80 47,05 44,01 44,05 ..1522,41 1554.86 1578.64 1619,40 1648.96 1672.41 1707,69 1757,80 69,13 N 133,99 75,28 H 141,20 79,81 N 146.56 87,I6 N 155,28 93.19 N 162.30 97,83 N 167,44 10§,33 N 175,07 116,46 N 185.83 137.15 146,44 153,32 164,48 173.57 180,39 191.00 206.40 1,t2 1,23 0,29 0.09 0,97 2.25 2.94 0,08 Customer o., : SHARD SERVICES DRLG ?latform ,., : NABORS 33 Slot/Well., ; /P2-14 MEASURED kNGL£ DIRECTION DEPTR DEG .;, DEG 1824.37 17,36 44,0~ 1799.67 1854,69 18,22 43.69 1828.54 i871,89 18,44 44.45 1844.87 1969,42 21,34 45,08 1936.57 2067,09 23,38 44.83 2026.89 2160.99 24,76 43.24 2112.63 2259.28 27.28 44.41 2200.95 2352.93 29.10 48,61 2283.50 2448,67 30.43 50.94 2366.61 2540.83 31,66 50.64 2445.56 2640,55 32,03 54,18 2530.28 2732,85 32,80 53,58 2608.20 2825,28 34,07 52,29 2685.33 29t8.89 35,16 51,15 2762,37 3014,82 35.26 48,67 2840,76 3111,29 36.73 50,08 2918.80 3206.09 38,27 53,25 2994.02 3300.89 40,11 53,82 3067.49 3394.61 42,49 53,71 3137,90 3492.53 46.02 54.30 3208.02 3584,13 45.06 54.02 3272.18 3680,33 44,94 51.74 3340.20 3771,80 44,98 49,81 3404.93 3866.83 44.45 46.99 3472.47 3958,36 46.53 44,78 3536,63 4055,65 51.03 42.83 4154.57 51,20 43.02 4250,03 51.73 4Z.09 4342.85 53.0I 44.70 4437.85 55,37 44.79 36O0.73 3662.83 3722,30 ~'~3778.98 3834.56 4535.62 59,21 45,01 3887,38 4626.25 62.92 43.84 .. 3931,22 4717,38 61.69 44,01 3973.58 {814.09 61,86 42,84 4019.31 4909.27 60,11 42.26 4065.48 5004,26 58.17 42,~3 4114.20 5096.83 58.56 43,08 4162.76 5194.12 60,57 42.88 4212.04 SPERRY-SUN DRILLING SERVICES SURVEY DATA HORTHINGS ~STIHGS VERTICAL FEET FEET SECTION 125.81 N 194.87 132.49 N 201.29 136.37 ~ 205.05 159.92 R 228.42 186.22 N 254,67 213,76 N 281,28 244.85 N 311.15 275,24 N 343,26 305,91 N 379.55 335,96 H q16,38 368.03 ~ 458.06 E 397.20 N 498,02 E 427.90 N 538.65 E 460,85 N 580.39 E 496,46 N 622,69 E 533.37 H 665,73 569.13 H 711,00 604.73 N 759.18 641,29 N B09,06 681.43 N 864,35 719.71 N 917,35 760.76 ~ 971,58 801,62 H 1021.65 846,00 N 1071,64 ~91.44 N 1118.48 944.27 ~ 1169.09 ~000,65 ~ 1221,53 1055,66 N ~272,02 1109,05 N 1322,53 1163.77 N 1376.76 1222,03 N 1434.82 1278,67 ~ 1490,32 1336.79 N 1546.29 ~398.67 ~ 160~.86 t459.9~ H 1661.15 ~520.i6 H ~7~6.18 1577.93 H 1769.78 1639.30 ~ t826.96 219,34 228,55 233,94 266.89 303.79 341,88 384.78 428.52 475,06 521,44 572,42 620,05 669.29 720.99 775.13 830,74 886,83 944.59 1004.17 1069.89 Z132.74 1198.53 1261,60 1327.38 13D2,05 1464.86 1541,59 1616.04 1689.24 1765,76 1926,28 2006,56 2091,41 2174.40 2255.71 2334,26 2417.84 LEG 0.48 2,86 1.89 2.98 2.09 1.62 2.62 2.87 1.84 =1,35 1.91 0.90 1.57 1,35 1,49 1.75 2.60 1,98 2.54 3.63 1.07 1.68 1.49 2.16 2.85 4.86 0.23 0.94 2,62 2,49 3.93 4,25 1.36 1.08 1.91 2.07 0.59 2.07 SURVEY DATA Customer .,, : SHAR~ SERVICES DRLG Platfor~ .., : NABORS 33 slot/Well ,, ; /P2-14 MEASURED ~GLE DIRECTION DEG .., PEG NORTH~N~S EASTI~{G$ VERTICAL ?EET ?E~T SECTION ~0~ LEG 5288.26 61,72 42,94 4257,47 5380,14 61,61 45.18 4301,08 5473,73 61,37 45.33 4345.75 5565,23 60,78 46.43 4390,01 5659,45 61.29 47,82 4435,64 1699.69 N 1883.10 g 2500.01 1757.80 N 1939,33 E 2580,45 1815.69 N 1997.74 E 2662,06 1871.44 N 2055,23 E 2741,42 1927.53 N 2115,64 g 2822,85 1.22 2.15 0.29 1.23 [,40 5754.42 59.65 47.48 4482.44 5549.10 60.0? 48.22 4529.99 5946,27 62.91 50.50 4576.37 6036,t9 63.02 48.78 4617.24 6130,19 61,09 48,85 4661,29 1983.19 N 2176.71 E 2904,35 2035.14 N 2237.42 E 2985.06 2093.72 N 2302.21 E 3068,80 2145.59 N 2363.24 E 3147,29 2200,27 N 2425.73 E 3228.90 1.75 3,58 1,71 2.05 6224.54 60.31 46.81 4707.46 6319.50 62.63 45.54 4752.82 6414,84 65.00 44,27 4794,89 6506.11 63.46 45.64 4834.57 6603,10 63.77 45.35 4877.67 2255.49 N 2486.71 E 3310.01 2313,27 N 2546,89 £ 3392.61 2373.86 N 2607,27 ~ 3477,57 2432.03 N 2665.34 E 3559.19 2492.93 N 2727,30 E 3645,36 2.06 2.71 2.76 2,16 6680,48 62.66 45.32 4912.54 6750,46 61.49 45,57 4945.31 6842,25 61.60 45,87 4989.05 6939,03 61.32 44.84 ~035.29 7036.57 61.23 45.73 50~2.17 2541.49 N 2776.43 E 37t3,90 2584.87 N 2820.49 E 3775,23 2641.22 N 2878,27 E 3855.23 2700,96 N 2938.76 E 3939.58 2761.14 N 2999.54 E 4024.46 1.43 1,70 0,31 0.98 0.~I 7128.56 62,39 45.23 5125,62 7219,16 63,33 44,84 5166.95 7318,05 63.81 45,64 5210.97 7408,62 65,04 45.27 5250.06 7506,03 65.49 44.14 5290.82 2517.99 N 3057,35 ~ 4104.88 2874,96 N 3114,39 E 4184,92 2937.32 N 3177.27 E 4272.80 2994,62 N 3235.49 ~ 4353,84 3057,50 N 3297.73 E 4441,73 1,35 1,11 0.87 1,41 1,15 7600.75 65.44 43.64 5330,16 7697.69 65.37 43.52 5370.50 7790,40 65.85 43,41 5408,79 7887.16 65.88 43.68 . ~<~448,35 7978.90 65.65 43.05 5486,01 3119.60 N 3357,46 E 4527,47 3183.45 N 3418,23 E 4615.22 3244.74 N 3476,31 ~ 4699,30 3308,74 N 3537,15 E 4787,21 3369.56 N 3594,59 E 4870,52 0,48 0,13 0.53 0.26 0.67 8072,77 64,76 43.02 5525.38 8165,61 64.14 42,38 5§65,42 8263,06 64,02 42.50 '" 5608,01 8359.64 64.17 42,78 5650,21 ~452,98 63,46 41.23 5691.40 3431,85 N 3652,74 E 4955,43 3493,40 N 3709,54 E 5038,93 3558,08 N 3768.69 E 5126.33 3621,99 ~ 38~7,54 E 521~.95 36S~.23 ~ 3883,59 E 5296.52 0.95 0.91 0,17 0.30 1.67 $547.23 63,35 41.45 5733,57 8840.30 64,12 41.35 5774,73 8736.~0 65,26 41.12 5815.82 3747.51 N 3939,27 E 5380.68 3810,12 N 3994.47 E 5464,01 3875.45 N 4051,73 E 5550,76 0.23 0,~0 1.21 SPERRY-SUN DRILLING SERVICES SURVEY DATA Custoner ,,, : Platform .,. : slot/well .. : SHAREI) SERVICF3 I)RLG NABORS 33 /P2-14 MEASURED DEPTH DIRECTION T~ NORTHINGS EASTINGS VERTICAL FEET FEET SECTION DOG LEG 8824.45 8922.61 9016.42 9109.50 9205.58 64.38 64.37 64.50 63.79 63,38 40.09 40.48 39.95 39,39 39.64 5853.28 5895.73 5936,21 5976,81 6019,55 3935,95 N 4103.59 E 5630.37 4003.46 N 4160.82 E 5718.82 4068,08 N 4215.46 E 5803.39 4132,56 N 4268.93 E 5887,12 4198,94 N 4323.68 E 5973.15 1.46 0.36 0.53 0,94 0.49 9300.90 9397,53 9490.75 9586,15 9678,69 9770.71 9868.93 9965,05 10057,33 10153,81 61.91 61.83 61,51 61,66 62,03 62,12 62.69 62.87 62,88 63,29 40.28 39,69 40,04 39.99 41.20 39,72 40.99 41.89 39.11 39,24 6063.35 6108,91 6153.14 6198,54 6242,21 6285.30 6330,80 6374,77 6416.85 6460.52 4263,83 N 4378,05 E 6057.76 4329,13 N 4432.81 E 6142.94 4392,11 N 4485.40 E 6224.95 4456,37 N 4539.35 E 6308.82 4518,32 N 4592.44 E 6390.33 4580,18 N 4645.20 E 6471,57 4646.51 N 4701.57 E 6558.55 4710,59 N 4758.14 E 6643.88 4773.03 N 4811.47 E 6725.94 4839,72 N 4865.81 ~ 6811,95 1,65 0.54 0.48 0,16 =1,22 1,42 [.28 0.85 2.68 0,44 10248.30 10342,12 10430.22 10523.11 10620,18 63.15 63.30 63.42 63,66 64,45 38,71 38,89 38.73 38,11 37,80 6503.10 6545.36 6584.86 6626.25 6668.72 4905.30 N 4918.87 E 6896.30 4970.58 N 4971,35 E 6980,05 5031.94 N 5020.71 E 7058.80 5097.09 N 5072.38 E 7141.95 5165.92 N 5126.07 E 7229.24 0.52 0.23 0.21 0.65 10713.88 10811,12 10902,32 1,0996,26 11092.47 65.03 64.05 64.52 64.73 64.88 37,77 37.35 36.46 36.44 36.28 6708,71 6750.51 6790.08 6830,34 6871.29 5232,89 N 5177,99 E 7313.98 5302.49 N 5231.51 E 7401,77 5368.19 N 5280.85 ~ 7483.91 5436.46 N 5331.27 E 7568.75 5506,57 N 5382,$9 E 7655.77 0.62 1,08 1.02 0.22 0.22 11!86.18 11282,19 11376,46 11469.24 11562,12 64,94 65.34 65,11 65.51 65,68 36.13 36.09 37,25 37.35 37,33 6911.03 6951.39 6990,90 ..7029.65 7068.03 5575,05 H 5433.02 f 7740,58 5645,43 N 5484.36 E 7827,64 5714.08 N 5535.48 E 7913,20 5781.13 N 5586.$7 ~ 7997.49 5848.38 N 5637.87 E 8082.06 0,16 0,42 1.15 0.44 0,18 11660,31 11756.63 11847,65 11944.76 12043,31 65,51 65,51 65.36 64.84 65.03 37,82 38,06 37,72 36.67 36.85 7108.60 7148.53 7186,37 7227.26 7269.01 5919.24 ~ 5692,39 E 8171.47 5988.37 ~ 5746.29 E 8259.13 6053,70 N 5797,i3 g 8341,91 6123.86 N 5850.38 E 8429,98 6195.38 N ~903.80 E 8519,22 0.49 0.23 0.38 1.12 0.25 12133.66 12229.90 12325.3! 64.76 64,02 62.94 37.76~ 38.31 38,39 7307.34 7348,94 7391,54 6260,46 ~ 5953.38 E 8601.02 6328.81 N 6006,85 E 8687.81 6395.76 N 6059,82 E g773.18 0,96 O.93 1.13 $~VRY DATA Customer .,, : SHARED SERVICF,$ D2~G Platform .., : NABORS 33 Slot/Well .. : 'P2-14 MEASURED ANGLE DIRECTION DEPT~ DEG ,' DEG ?VI) NOR~ING$ EASTINGS VERTICAL FEET FE~T SECTION DO~ 12416.97 61.95 38,49 7433.94 12510,96 61.40 38,79 7478,54 12601,95 51.44 38,53 7522.07 12685,17 61.66 38,53 7561.71 12779.90 61.92 38,69 7606.49 6459.4t 6524,04 6586,43 6643.67 6708.90 6110.34 E 8854.44 6162,00 E 8937.I7 6211,92 E 9017.07 6257,50 E 9090.24 6309.59 E 9173.71 1.08 0.65 0.25 0.26 0,31 12812.27 6!.28 38.99 7621,89 12906.64 61.44 39,19 7667.12 13000,37 61.54 38,76 7711,86 13093.58 61.69 39.35 7756,17 13188,28 61.69 38.28 7801,08 6731.08 6795.36 6859.39 6923.07 6988.03 6327,45 E 9202.19 6379.67 E 9285.00 6431.48 E 9367.35 6483.14 E 9449.35 6535.40 E 9532.71 2.14 0.25 0.42 0.58 0.99 13282.44 61.99 37,74 7845.52 13381,43 62.54 37.48 7891.59 13475,59 62,47 36,46 7935.06 13573.99 61.85 36.06 7981.01 13666,03 61,91 34.84 8024.39 7053,44 7122.85 7189,58 7259.74 7325,87 6586.52 ~ 9615,73 6639.99 E 9703.34 6690.22 E 9786,85 6741.69 E 9873.8i 6788.77 E 9954,89 0.60 0.60 0,96 0.73 1,17 13762,37 61.78 34.54 8069.85 13854.08 60.81 35.42 8113,90 13949.30 60.69 35.26 8160.43 14043.09 60,82 34.88 8206.25 14138.73 61.01 34.59 8252.74 7395,71 7461.62 7529.39 7596,36 7665.05 6837,11 E 10039.67 6883.22 E 10119,99 6931.27 E 10202,96 6978,30 E 10284,68 7025.92 E 10368.11 0,31 1,35 0,19 0,38 0.33 14233,94 61,17 34,62 8298.77 14328,04 61,40 34.55 8343,98 14418,61 61.50 33,66 8387,26 14511.22 61.56 33.57 8431,41 14612.24 61.50 32.79 8479.57 7733.65 7801.59 7867.47 7935.26 8009.59 N 7073,25 E 10451,29 N 7120,10 E 10533,66 N 7164.70 £ 10613,01 N 7209,77 E 10694.17 N 7258.37 ~ 1078~.63 0.17 0,25 0,87 0,11 0,68 14699,67 61,95 29,66 14790,98 62.41 26,36 14887,72 62.90 21.82 14981.19 63.12 18.21 15078.06 63.75 15.52 8520.99 8563.61 8608,07 -'~.-8650.50 8693.83 8075.42 8146.71 8225.!3 8303.37 8386.27 7298.28 E 10859.05 7336.19 E 10938.52 7371.24 E 11021,84 7399.74 E 11100,96 7424.87 E 11181.67 3 3.24 4.20 3,45 2,57 15172.14 65,08 12,33 15264.93 63,75 9,70 15359,56 64,22 8.34 15456,43 64,26 6,32 15550.84 63.62 3.05 15645.77 63.75 1,6~ 15740.38 63.99 1,78 15834,43 63.99 1.98 8734,46 8774,54 8816,05 8858,15 8899.64 8941.72 8983,39 9024,63 8468.62 8550.76 8634,75 8721.27 8805.78 8890.80 8975,70 9060,18 N 7445,27 E 11259,02 N 7461,27 B 11333.48 N 7474.60 E 11407.75 N 748§,73 ~ 11482,65 N 7492.66 E 1155~.3~ 7496,16 H 11622.38 7498.71 E 11690,70 7501,48 E 11758.83 3.37 2.93 1.38 1.88 3.18 1,32 0.28 0.19 SPERRY-SUN DRILLING SERVICES customer ,., : S~ARED SNRVICB~ DRLG ?latfor~ ,., : NABOR$ 33 Slot/Well .. · /P2-~4 MEASURED ANGLE DIRECTION TVD NORTHINGS EASTINGS DEPTH DEG DEG FEET FEET 15928,44 63,26 2.47 9066.39 9144,34 N 7504,75 16024,49 62,71 2.19 91t0,02 9229,84 N 7508.23 16119,95 62,17 2.24 9154.19 9314,40 N 7511.50 16207,01 62,17 2,24 9194.83 9391.33 N 7514.51 THE DOGLEG SEVERITY IS IN DEGREES P~R lO0.O0 F~ET. N/E COORDINATE V~LU~S ¢IV~N R~7~%TIVZ TO W~LL SYS?~ REFER~CE POINT. TV]) COORDINATE VALUES GIVEN R~LATIV~ TO WELL THE VERTICAL SECTION ORIGIN IS W~LL BEAD. THE VERTICAL SECTION WAS COHI~3TED ALONG 38.17 (TRUE), CALCULATION ME.OD: MINI}{~ CURVATURE. SURVEY SHOWN AT 16207' MESURED DEPlqt IS AI~ EXTRAPOLATION ~ T]~E BIT VERTICAL SECTION 11827.02 11896.38 11964.89 12027.23 LEG 0.91 0.63 0.57 0.00 i Shared Services Drilling Well: P2,.14 PH Wp3 DrillQuest' 70( I 1200 2400 ...KOP: Slan Dir C 0,000'/100ft 300.00h MD, 300.00h 'D/D : i,Dir Raio Increa$o ~ 1.500'/lOOh: 50G.0Of~ MD, 499,96fl T'VO .,' ,End Dir, Stdl ~ 20.000*: 1701.40~t MD, 1674,53~t 't'VO .... .Start Oir .0. 2 ,,~00,~/1 croft :3 ~£.~ gtt ~. 1932 ~O~ r.~h ......................................................................... PROPOSAL TARGET SUMMARY ,..Dir ROlO Incro~e ~fl5¢ I'¢ri,ltIJr(:.s ( · I ?.Yr. 1 O )"VD ., , .End DIr, gall o ,~6,000': 3231.O£fl MD, 2979.94tt TVD , Formation Tendency O 1.00OqlOOfl: 3835,75fl MD, a400.OOft TVD · End DIh$eil ~ 4~,S79': 3¢77,11~ MD, 3S00,0011TVD ,' ,.Stag Dlre 2.S00V10011: 4118,28ft MD, 3800.0011TVD ,, Encl DIr, SMI O 60,750'; 4772,01 I1 MD, 3995,22t~ 'r'VD $V4 [£.~fit)hrtc] · .t?l~= Ir.., ] VI) Duck PVJt ~)):: - 4049. I0 B'D ~00 000 07oo.o0'~,,~ Start Dir O 2.O00'/100h; 7~2~7,§9h MD, 5~00.0OII ~ ' / ' ' ' .... ' "' ~,,' BHA Tende~ ~ 0A23/I~K: 7432,36[ MO 5290.~71t TVO ......... 7d~D,~., ~ ' ............................ ,', .......................................... ~,: ........................................... Uc;~ (A',IS) · 5/~.10 ~D 10 3/4 Casing - ~724.20 MD, 494g.10 TvD- 8300~~ 0700~~ g 1 oo,oo ~"' -' ~00,00 ~03~.~ i ,,~ ........... ~ ~,{;, 0 1200 ~0 3600 ~00 8000 7200 Seale: llnch · t200ff V~]cal ~ectlon ~ct[on ~muth: 38,167' (True No~h) i~nd Dlt, SI~II ~ 63.400°: 11073.70ft MD, 6016,4611TVD , ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~: 'C~o~vill¢ ~lO~.~l~,;~nt~'~. 7151,~0 ~osoo.oo ~ ..... ~3g~.oo~ ~ /SJ~ Olt ~ 4.~'1100h: 14~80.30~ MD, 8441,80H ~g 143o~ 147oo~ ~ / Target, End Oit, Sall O 66.715': 15736.58~ MD, 9008.10h TVD 15too,oo ~ / /Toal Dep~; 18154.88~ MD, 9173,44h TVD , . g~ · ............................................ ~'i~'SF~i"L:i;it7 ........ ~'~ .............. ........................................... ~0~8,10, ~Y~,: ~?~0~. ?~57,3~ ~ .................. .~;~.~,cl,. 9~s. to ~ I I ........ I 7sOO g000 10200 lfl~O Seale: linch = 120~ Seetlen ~lmuth; 38,~67' (True No~h) V.~ical Section 5cele: lln=h = 1200ft BOO - ~.00 - O0 O0 Shared Services Drilling Well; P2-I4 PH Wp3 Eastings 3e~o 4aloo eoloo DrillOuest' Total Depth '. 16154.~Bfl MD. §173.44tt TVD Target, End DIr, $~10 0B.TtS': 15738.50q h~D, 9(X)8,101[TVD P2.14 I(PH) - Circle 9008.10 TVD . 8972.90 N, 7457.34 E 6100.00 7100.00 End DIr, Sail ~ 8~.400': 1 t073.70~ MD, 8916.46fl ~D ..... .... ~6~:~, 6700.~ ~100,00 ~.~, · ~"~ m, 10 3/4" Casing. 6724.20 MD, 4949.10 TVD .. 49(]0.00 4700JX) 460.0.~3 4100.00 3g00 ~ ", 00~, ~d Off, Sail e 60.75~ = 477~.01~ MD, 3995,~ ~D "~ ',~ ~nd Olr, ~1 e ~,57g~ ~ 3g~l,Bg~ MO, 3500.0~ ~D 30oo.o~ ~atlon Tenden~ 0 1,0~/1~: ~S,?8~ MD, 78oo oo~--~ ~' End O1~, S~{I ~ 46.~0'; ~31,05~ MD, 297~,~ ~D ~00.~ "' DIr Rale Incre~,e e 2.2S0"/1~0~: 2a7s.4alt MD, 271&~1[ ~D /~/~ ~nd DIr ~ 2.~/100~: 197B.4~l MD, lg32.~lt ~D o ,... ~nd DIr, S~ll ~ 20,000~: 1701.4~t MD, 1674.B31[~D , , 1 ...... J I I 0 1200 2400 3600 5cain: linch = 120OH 'j.].:.,..P~O2OSAL ~AROET ~UMMARY 7¥° .. 0500.00 03O0.0O Im 9600 840O 7200 6000 4.80O 3600 ' BHA Ter~dency ~ 0,123'/10~: 7432.06k MD, S~gO.871! T'VO Start DIr · 2,000*/100fl: 7237,$g[1, MD, 52oo.oofl 'rVD 1200 FOR PERMITTING ONLY 1 4~00 L 6000 7200 R~fpr~l.¢e Is ~'ruo North SURFACE LOCATION ,PLOY' O~Af(: ..... MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: David Johns,~ Chairman DATE: June 23, 1998 THRU: Blair Wondzeil, ~ FILE NO: P. I. Supervisor (:~/'~ FROM: Chuck Scheve, g 3 SUBJECT: Petroleum Inspector a29kfwfe.doc BOPE Test Nabors 33E Point Mclntyre PM2-14 PTD # 98-105 Monday June 23, !998: I traveled to Nabors Rig 33E drilling the PM2-14 well and witnessed the weekly BOPE test. As the attached AOGCC BOPE test report shows the test lasted 5 hours with one failure. The casing pressure gauge on the choke panel needed the sensor pumped up. The manifold pressure on the koomey unit was set at 1100 psi instead of the recommended 1500 psi, this was adjusted during the test. The rig was clean and all related equipment appeared to be in good working order. The location was well organized allowing good access to the rig. Summary: I witnessed the weekly BOPE on Nabors rig 33E drilling the Point Mcintyre PM2-14 well. Nabors 33E, 6~23~98, Test Time 5 hours, one failure Attachment: awqkekfe.xls X unclassified Confidential (Unclassified if doc. removed ) Confidential STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg:_.___._ Drlg Contractor: Operator: Well Name: Casing Size: Test: Initial X Workover: DATE: Nabors Rig No. 33E PTD# 98-105 Rig Ph.# SSD Rep.: Kirk White PM2-14 Rig Rep.: Dan Herber~ Set @ Location: Sec. 14 T. 12N R. 14E Meridian UM Weekly X Other 6/23/98 659-4787 ~MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location YES Standing Order Posted YES FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Well Sign OK Drl. Rig OK Hazard Sec. OK Test Quan. Pressure 2,.50/5,000 ,, 1 I 250/5,000 I 250/5,000 P/F BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. P/F I 25O/3500 P I 250/5,000 P f 250/5,000 P I 250/5,000 P I 250/5,000 P 2 250/5,00O P f 250/5,000 P N/A CHOKE MANIFOLD: No. Valves 14 No. Flanges 34 Manual Chokes 1 Hydraulic Chokes 1 Test Pressure 250/5,000 Func~ned Functioned P/F P P P P 3000 ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 1500 MUD SYSTEM: Visual Alarm minutes 30 Tdp Tank OK OK 3 minutes 35 Pit Level Indicators OK OK OK Remote: Flow Indicator OK OK 4 (~ 2100 PSI Meth Gas Detector OK OK Psig. H2S Gas Detector OK OK sec. sec. OK Number of Failures: I ,Test Time: 5.0 Hours. Number of valves tested 24 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. !. Supervisor at 279-1433 REMARKS: the koomey unit. Casing pressure gauge on choke pane/needed sensor pumped up, also adjusted manifold pressure on Distribution: odg-Well File c - Oper./Rig c - Database c - Trip Rpt File c- Inspector F1-021L (Rev.12_/94) STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: v~rrtnessed By: a29}(fwfe Chuck Scheve TONY KNOWLE$, GOVERNOR A~ASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 May 22, 1998 Lowell Crane Engineering Supervisor ARCO Alaska, Inc. PO Box 196612 Anchorage, AK 99519-6612 ac~ Point McIntvre P2-14 ARCO Alaska. Inc. Permit No 98-105 Sur. Loc.' 16'SNL, 1157'EWL. SEC 14, T12N. R14E. UM Btmholc Loc: 522'SNL, 1792'EWL, SEC 01, T12N. R14E. UM Dcar Mr. Crane: Encloscd is thc approved application for permit to drill thc above rcfcrcnccd well. Thc permit to drill docs not exempt you from obtaining additional permits required by law from othcr governmcntal agcncics, and docs not authorize conducting drilling operations until all other rcquircd permitting determinations arc made. Your rcqucst for a divcrtcr variance is approved. Blowout prevcntion cquipmcnt (BOPE) must bc tcstcd in accordancc with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE tcst performed bcfore drilling below the surfacc casing shoe must be givcn so that a rcprcscntativc of thc Commission may witness the test. Noticc may be given bx.' contacting thc Commission pctrolcum ficld inspcctor on thc North Slope pager at 659-3607. Robert N. Christcnson, P.E. Commissioncr BY ORDER OF THE COMMISSION dlffcnclosures cc: Department of Fish & Game. llabilat Sect/on w/o encl. Department of Enviromnent Conservation w,'o encl. STATE OF ALASKA ALASKA 'fS'~L AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 NOTE: DIVERTER WAIVER REQUESTED la. Type of work [~Drill []Redrill Ilb. Type of well I--IExploratory I-']StratigraphicTest I~Development Oil [] Re-Entry I-I DeepenI []Service []..Developm..ent.Gas []Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska Inc. Plan RTE = 49.0 Point Mclntyre 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 365548 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 16' SNL, 1157' EWL, SEC. 14, T12N, R14E, UM Point Mclntyre At top of productive interval 8. Well Number Number U-630610 1579' SNL, 3309' EWL, SEC. 1, T12N, R14E, UM P2-14 At total depth 9. Approximate spud date Amount $200,000.00 522' SNL, 1792' EWL, SEC. 1, T12N, R14E, UM 05/24/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 377054, 522'I P2-15, 6.3' at 899' MD 3601.1 17654' MD / 9149' TVD ...... 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 300' MD Maximum Hole Angle 91° Maximum surface 3520 psig, At total depth (TVD) 8800' / 4400 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 133# H-40 BTC 80' 49' 49' 129' 129' 260 sx Arctic Set (Approx.) 13-1/2" 10-3/4" 45.5# L-80 BTC 6676' 48' 48' 6724' 4949' 2072 sx Coldset Ill, 757 sx Class 'G' 9-7/8" 7-5/8" 29.7# L-80 BTCM 15423' 47' 47' 15470' 8897' 301 sx Class 'G' 6-3/4" 4-1/2" 12.6# 13CR NSCT 2334' 15320' 8830' 17654' 9149' 489 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface I~oerdr~ce~ioanteR E([E I Liner 201998 .. Perforation depth: measured 'ORIGINAL true vertical _~0. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Greg H/bbs, 564-4191 Prepared By Name/Number: Carol Withey, 564-4114 21. I hereby certify that the fo,r~going is true a,~c,~rect to the best of my knowledge Signed /"-'%(,. ~ . .,~ ~ .. LowolIC o .~_~..~¢ /L-/~--?..~ ~me u,iiih~j-Engineering Supervisor Date Commission Use Only ¢~"-/4:~.z~'- 50-O-~--c~'- .2....% ~;~'~' '~c?~-o~/~ for other requirements Conditions of Approval: Samples Required []Yes J~No Mud Log Requlred ' []Yes Hydrogen Sulfide Measures J~Yes I--INo Directional Survey Required J~Yes []No Required Working Pressure for BOPE []2M; []3M; ~.5M; [] 10M; [] 15M Other: ORIGI NAL SIGN ED' BY by order of e~"~l~,~),~.¢~:::~.~/./~" Approved By F~ol;;~I1; N. (~hristerl$0rl Commissioner the commission Dat Form 10-401 Rev. 12-01-85 Submt / ~)licate I We~ Name: I P2-14 I I Type of Well (producer or injector): I Producer Surface Location' 16' FNL, 1157' FWL, TJ12N, R 14E, S 14 Target Location: 1579' FNL, 3309' FWL, T 12N, R 14E, S 1 (Top Kuparuk) Bottom Hole 522' FNL, 1792' FWL, T '12N, R 14E, S 1 Location: I AFE Number: 12B0224 I Date:Estimated Start 15/24/98 I Rig: I NABORS33E Days to complete 23 IMD: 1~7654' I I TV~: 19149' I I RTE: [49.0 IWell Design (conventional, slimhole, etc.).' Slimhole 75/8" Int. Casing, 4-1/2" 13 Cr liner and tbg Formation Markers: Formation Tops MD TVD Base of 1818 1784 Permafrost SV4 4292 3719 SV1 (-I-3) 6294 4739 10 3A" Casing 6724 4949 10 3/4" csg shoe below SV1 & above Point K- 15 K15 (Ugnu) 7205 5184 West Sak 11506 7109 9.5 ppg minimum mud weight required. 7 5/8" Casing 15470 8897 Intermediate String Shoe' K-10 15578 8943 9.6-9.9 EMW to this depth. 3% 10.3 ppg KCI GEM System at 500' ABOVE K-10. HRZ 15673 8978 K-5/HRZ same depth Kalubik 15771 8998 Kuparuk 15800 9008 Fault (Approx.) 17350 9083 May cross into HRZ due to fault throw. OWC 17512 9118 TD 17654 9149 4-1/2" liner shoe. 140' MD below OWC. Casing/Tubing Program' Hole Csg/Tbg Wt/Ft Grade Conn Length Top Btm Size O.D. MD/TVD MD/TVD 30" 20" 133# H40 BTC 80' 49/49' 129 '/129' 13-1/2" 10 3/4" 45.5# L-80 BTC 6676' 48/48' 6724'/4949' 9 7/8" 7 5/8" 29.7# L-80 BTCM 15423' 47/47' 15470'/8897' 6 3A 4 1/2 12.6 13 Cr NSCT 2334' 15320/8830 17654'/9149' Tubing 4 1/2" 12.6# 13-Cr NSCT 15259' 46'/46' 15305'/8824' Mud Program: Surface Mud Properties: Spud 113-1/2" hole section Density (ppg) [Funnel Vis I Yield Point 10 sec gel ll0 min gel 8.7-9.5 1100-300 30-70 20-60 40-80 pH Fluid Loss 9-10 15 - 25cc Production Mud Properties: LSND 19-7/8" hole section Density (ppg) l Funnel Vis Yield Point 10 sec gel 10 min gel 8.8-9.9I 40-55 18-22 5-15 < 30 pH Fluid Loss 9.0-9.5 4-6cc Production Mud Properties: 3% KCL 19-7/8" Pilot Hole section, 6 3A Prod. Bore, GEM I Density (ppg) Plastic Vis Yield Point 10 sec 10 min pH Fluid Loss gel gel 10.3-10.6 8-15 15-25 8-15 < 30 9.0-9.5 <5cc Cement Data: Casing First Stage: Second Stage: Comments Sxs/Wt/Yield Sxs/Wt/Yield 10-3/4" Coldset II1: 1194/12.2/1.92 Two stage job: surface 878/12.2/1.92 (assumes 200% First stage Coldset III lead casing excess in from 2100'-5190' @ 50% to 6724'. Class G: permafrost) excess followed by Class ES cementer 757/15.8/1.15 G tail from shoe to 5190' @ at 2100' (750' TVD) @ 50% excess MD. + 80' shoe. Second stage Coldset III circulated to surface. Int. Casing Lead:Sxs/Wt/Yield Tail: Sxs/Wt/Yield Comments 75/8" none 301/15.8/1.14 Class "G" Volume based on cement 1000' above the shoe with 50% excess + 80' shoe. Liner Lead:Sxs/Wt/Yield Tail:Sxs/Wt/Yield Comments 4 1/2" none 489/15.8/1.19 Class "G". Volume based on cement across entire ~ liner with 50% excess + 80' shoe+150' lap. Logging Program: I OPen Hole Logs: ICased Hole Logs: 13 1/2" MWD/multi-shots as directional survey. MWD/LWD GR/RES to 500' above K-10. MWD/LWD GR/RES/DEN/NEU (Triple Combo) to 9 7/8" (PH) TD. MWD/LWD GR/RES to 6 3/4" TD. CBT-CET (contingent on cmt job mechanics). Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. It is requested that the diverter be waived for this well. The diverter would point at Manifold buildings or other wells with the design of N-33E. There has never been any surface gas reported in any of the PM-2 drilling programs. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: KOP: 300' MD Maximum Hole Angle: 91 degrees Close Approach Wells: P2-13 6.6' Allowable Deviation @ 401' (SI) P2-15 6.3' Allowable Deviation @ 899' (SI) P2-16 16.2' Allowable Deviation @ 695' (SI) P2-49 32.19' Allowable Deviation @ 8742' (Flowing). NEEDS DEEP PLUG. Drilling and Completion Scope ]. Move rig to P2-14. NU riser and flowlines. 2. Drill 13 1/2" surface hole to - 6724' MD. 3. Run and cement 10 3/4" casing. Cement to surface with two stage cement job. 4. RIH with 9 7/8" bit, MWD DIR/GR RES, drill out DV cementer, RIH to float collar. 5. PT casing to 3000 psi for 30 min. Record on chart. d. Drill out 20', perform LOT. Record on chart ?. Drill 9 7/8" intermediate/pilot hole with MWD DIR/GR RES to 500' MD above the K-10. POOH for LWD Triple Combo and Bit. Swap to 10.3 PPG 3% KCI/GEM system. 8. Drill 9 7/8" pilot hole to 16059' MD. (A slim potential exists for a PH Iongstring completion). 9. POOH, evaluate logs, Place an open-hole cement plug to 15,400' MD. Polish to 15470' MD. ]0. Run/cement 7 5/8" long string to 15470' MD. PT to 3500 psi, record on chart for 30 min. ] ]. RIH with 6 ~A" bit and MWD/LWD GR/RES. Drill out 20', perform LOT. ]2. Drill 6 SA" hole to the target, laying out at ~90 degrees and drilling towards the fault to the East ]3. Geo-Steer as necessary to determine the top Kuparuk across the fault. After achieving this, drill to TD of the well, 140' MD below the OWC. POOH to run liner. ]4. Run and cement 4 1/2" 13 Cr liner to TD. Use inner string cement job. Run ZXP packer on separate run. ]5. Perforate liner w/500 psi underbalance and DPC 2.75" perf guns. Kill well. Id. Run 4-1/2" 13 Cr tubing with 7 5/8"x4-1/2" packer, 4-1/2" TRSSSV, and 4-1/2"xl" GLMs. !7. Secure well, RDMO. Drilling Hazards/ContingenCies .... · · The original reservoir pressure is 4377 psi at 8800' ss. The expected reservoir pressure is 4400 psi at 8800' ss based on a recent P2-33B static. Formation pressures above this are not expected in this well. The 10.3 ppg mud will overbalance the anticipated pressure by 200 psi. · Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA bailing Gumbo problems. · Coal stringers/SV Sands in the lower Ugnu have caused stuck pipe. · No major instances of lost circulation problems have occurred on Pt Mac 2 wells. Disposal · Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough. GH 05/19/98 TREE: 4 1/16"- 5M Chrome WELLHEAD: 11" x 11" - 5M FMC P2-14 RT-GL = 33.8' GL-SL = 11.6' 10 3/4", 45.5 #/ft, L80, I 6724' BTC IKOP: 300' Max Angle: 91° @ 16230' 4-1/2" 12.6# 13Cr, NSCT 3.958" ID 0.0152 bbl/ft Capacity 4-1/2" TRSSV I 2,1oo' I GAS LIFT MANDRELS 4 1/2" X 1" MD 'I-VD Type 1 TBD TBD 41/2" x 1 2 Camco 3 MBX 4 5 SPM 6 7 BAKER Tie Back Sleeve & II 15,305' ZXP Packer BAKER HMO Hanger } 15,320' 7 5/8", 29.7 #/FT, L80, BTC-M Plug Back Depth I 17,614' I 4 1/2" 12.6#/FT, 13 Cr, NSCT I 17,654' I (3.958" ID, 0.01522 bbl/ft) 15,470' Date 5/19/98 Rev By Comments GH Proposed Completion 7 5/8" x 4-1/2" 9 Cr Packer 5,275' 4-1/2"X Nipple (3.813" ID) I 15,285' 4-1/2"X Nipple (3.813" ID) I 15,295' 4-1/2" Mule Shoe I 15,305' 4-1/2"X Nipple (3.813" ID) I XX,XXX' I Perforation Summary Ref Loc Size Interval ~PF Open/Sqzd 4-1/2"X Nipple (3.813" ID) I XX,XXX' I Point Mclntyre WELL: P2-14 APl NO: 50-029- Shared Services Drilling I'IR¥-I~-U8 'I'UE 11:44 hri SPERRY-SUN ALASKh Flq× NO, 19075635754 P, 02 st, so vi , DrillQuest' ~ 411121 ,.--~-..~ .,31am~ir.~moo?/l~z,~-4~[M~l~og~ ......................................................................... 2400 -~ 2700,0~, ,Dir Rate In~oa~e a ~2~0~/1~ [ m75,4~ MO, 2715.~ ~D %, ~ ~ .End DIr, ~ ~ 46,000": 3331.O~fl MD, 2979.~E T~ ~ I ....... ~ ," EndDir, S~l 0 ~.~9'"30~MD,~.ffi~D .............................. 4~'b~;,~'"'" End DIr, 8~1 e 6o.7~': 4~2,01 ~ MD, ~5,~ ~D ........................................ ~,[~...~; ........................................................................................ , 51 GO.Off ~ I... ~ ........ ~.~ .............................................................. T'~ ('l'l~/~'VI), 4739. lO TVD ~00 --,'.- ~~: ;~%~ ' '~ ........................................................... ~nllmn gluck Pipa 2m~e - 4~49. I0 2~D ' O700.dO~ ~lSg Dir ~ 2.~'/lOOR; 7287,69R ~,,' BHA tende~ ~ !.,. ~" '~~.;2 ........................................... . II 10 8/4" Casing - 6724.20 MD, 4940.10 WD ~8000 - 107~, .... r ........... ! I ~ " ~ o 1200 ~0 3600 ~00 SODa 7200 ~ale: linch · t200fl VeStal Section ~tlo. ~mpth; 38.167' (Tree No~h) End ~k, ~11 ~ 63.4~=: 11073,70fl MD, ~1~,46R ~D / ' : ........... t~t .7 .l :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ....... ~,',/.~,..,.g.~.~','~ ~ ~ ....... ~ ~E~ . ~ ~9~ ............. , ~ ~ ~ao~.~ ~ Sta~ DIr 0 4.~*tl~h: 14480.~0fl MD, 8441,80~ ....... · ~l 147~.~~ . T~gel, End Bit, Sail ~ 8~.718 ! I -" I 7800 9000 10200 11~0 3tale; tln;h ~ 120~ ~oeti~ ~lmuth; 38,167' ~rue Ve~ical Smctlon Shared Services Drilling Point Mclntrye Measured Depth (ft) Incl. Azim. Su b-Sea Depth Sperry-Sun Drilling Services VerZi cai Local Coordi nates Depth Nort hings East[n gs (~) (f~) (~) 0.00 0,000 O. OOD -49.10 0.00 100,00 0,000 O. O0~ 50,90 100.00 200.00 0.000 0,OOO 150,99 200.00 300.00 O.OOO 0,000 250,90 300.00 400.00 1,000 53,000 350,89 399, 99 5DO. DO 2.000 53.000 450.86 499.96 690.09 3.509 52.450 550.74 599.84 700.00 5.000 52.229 650.46 699,56 800.0~ 6.500 52.110 749.96 799.0~ 900.00 6,000 52.036 849. ! 6 896.26 966.69 9,000 52.000 9'[ 5.'[ 1 964.21 1000.00 9,498 51~.717 947.99 997.09 1100.00 10,992 51.018 1046.39 1095.49 1200.00 '[ 2.489 50.486 1144.30 1193.40 '[ 300.00 13.985 50.065 1;241.64 1290.74 14OD.OD 15.483 49.725 1339.35 1397.45 1509. OD 16.981 49,443 1434.35 1483.46 1600.00 18.479 49,206 1529,60 1578.70 1700,8'0 19.978 49,603 1624.02 1673, I2 1701.49 20,000 49.000 1625.43 1674,53 1800.00 20,0G0 49.000 1717.99 .[767.09 18'15.86 20.000 49.000 1732.90 .[782,O0 1818.10 20.000 49.000 T735.00 1'784-,10 t900.00 20,000 49.000 '[811.96 -r861.08 1975.49 20,000 49.000 I882.90 1932.00 2000.00 20.490 49.000 1905.90 1955.00 210O,OO 22.490 49.000 1998.94 2048.04. 2~0~.00 24.490 4 9.000 2090.65 2139.75 2309.00 26.4 90 49.000 2180,91 2230.01 ~_375.49 28.000 49.000 2:24 8.02 2297.12 Proposal Report for P2-14 Wp3 PH o.00 N O,OO E 0.00 N 0.00 E 0.00 N 0.0D E 0.00 N 0.0D E 0.53 N 0,70 E 2.10 N 2.79 E 5.0'[ N 6.60 E 9.54 N 12.47 E 15.69 N 20.38 E 23.44 N 30.33 E 29.51 N 38.10 E 32.82 N 42.31 E 43,93 N 56.20 E 56,89 N 71.95 F_ 71.44 N 69.56 E 87.83 N 109.01 E I05.95 N 130~29 E I25.80 N 153,38 E 147.36 N 178,27 E 147.70 N 178,66 E 169.80 N 204,09 E 173.36 N 208.18 E 173.86 N 208.76 E 192:24 N 229.90 E 209.16 N 249.39 E 214,74 N 255.79 E 238.76 N 283.43, E 264.92 N 313.51 E 293.16 N 345.99 E 315.83 N 372.07 ]:: Global Coordinates Dogleg Vertfca[ North [ngs Eas/ing s Rate Section (ft) (ft) (°llOOft) (ft) 5998563.72 N 681392.67 F_ 0,0D 5991~563.72 N 651392.67 :E 0.000 0.00 59995F~3:72 N 661392.67 :F_ 0.000 0.00 59985F:x3,72 N 691392.67 F_ 0.000 0,00 599856.4.26 N 681393.35 E '[.000 0.84 5998565.89 N 681395.41 E '[.000 3,37 5998568.89 N 681399.15 E 1.500 8.02 5998573.56 N 681404.90 E 1.500 15.20 5998579,90 N 681412.66 E 1.500 24.92 5998587.89 N 681422,42 E 1,500 37.17 5998594.15 N 681430.04 E 1.500 46.74 5998597.55 N 681434.17 E 1.500 51.95 5998609.00 N 681447.79 E 1.500 69.26 5998622.25 N 681463.22 E 1.500 89.12 5998637.31 N 681489,47 E 1.500 `['[1.51 5998654.17 N 681499.52 E 1.500 `[36.41 5998672.80 N 681520.35 E 1.500 163.81 5996693.21 N 681542.95 E 1,500 193.69 5998715.37 N 681567.31 E 1,500 226.02 5998715.71 N 68'[ 567.69 E 1,500 226.53 59987'38.43 N 681592.57 E O.O00 259.62 5998742,08 N 681596.58 E 0,00'9 264,95 5.998742,60 N 661597.15 E O.~GO 265.70 5998761.49 N 691617.84 E 0.000 2:93.21 5998778,89 N 691636.90 E 0.000 318.57 5998784.61 N 681643.17 E 2.000 326.90 5998809,31 N 681670.22 E 2.000 362,89 5998836.18 N 681699.66 E 2.000 402.03 5998865,19 N 681731.44 F_ 2.000 444.2'9 5998888.49 N 681756.97 E 2.000 478.2"3 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment KOP' $1ar[ Dir @ 0.000"/'[ooff ' 30o.00R MD, 300.00ft TVD Dir Rate Increase @ 1,500°/10Oft· 500.00fl MD, 4gg.gsft TVD End Dir, Sail @ 20.000°' 1701.49fl MD, 1674.53fl TVD Base Pezmafrost Star[ Db @ 2.000°/10Oft · 1975,49ft MI:). '[932,00ft TVD Co~nued... May, 1998 ~ 11~27 - 1 - DriltQuest Shared Services Drilling Point Mclntrye Measured Depth incl. Azim, Sub-Sea Depth (ft) Vertical Depth 2400.00 28.490 49.000 2269.61 2318,71 2500.0-3 30.491) 49.000 2356.65 2405.75 260~3.00 32.49~ 49.000 244'[.92 2491.02 2700,00 34.4,90 49.000 2525.31 2574.4! 2800.00 3~J.4~0 49.000 2806.73 2655.83 2875.49 3a.O00 49.000 2661~,82 2715.92 2900.00 38,551 49.000 2686.07 2735.17 3000.00 40.801 49.090 2763.0:3 2812.13 3100,00 43.051 49.000 2837.42 2886.52 3200,00 45.301 49,01~ 2909.14 2950.24 :3231.05 4 6.000 49.000 2930.84 2979. ~ 3300.00 4 6.000 49.000 2978.74 3027.84 3400.00 46.0F.,0 49.000 3048.20 3097.30 3500.00 46.0[30 49.000 3117.67 3166,77 3600.00 46.0/30 49.000 3187.I4 3236,24 3700.00 46.000 49.000 ;3256.60 3305.70 3800.00 46.000 49.000 3326.07 3375.17 3835.75 46.000 49.000 3350.99 3400.00 3900.00 45.35-7 4:9.000 3395.7:9 344 4.89 3977,89 44.579 49,000 3450.90 3500.00 400/3.00 44.579 49.0[N) 3466.65 3515.75 4100.00 44.579 49.000 :3537.88 3585,95 41 ! 8.28 44,579 49.000 3550.90 3600,00 4200.00 46.595 48.544 3608.08 3657.18 4292.06 48.869 48.065 3670.00 3719,10 4300.00 49.066 48.025 3 575.21 3724.31 4400.00 51.538 47.544 3739,08 3788.18 4500,0'3 54.01:2 47,095 3799,57 3848.67 4600,00 56.488 46,673 3856.57 3905.67 4700.00 5.B.985 46,274 3909,96 3959.06 Sperry-Sun Drilling Services Proposal Report for P2-14 Wp3 PH Loca! Coordinates North[ngs East[ngs (fi) 323.44 N 380.83 E 355.73 N 417.98 E 390,00 N 457.40 E 426.20 N 499.04 F_ 464.29 N 542.85 E 494.2§ N 577.33 E 504.22 N 588.79 E 546.10 N 636.97 E 589.94 N 61~7.40 E 635.65 N 739,99 E 650.22 N 756.74 E 652.76 N 794.18 E 729.95 N 848,4.7 E 77'7.15 N 902.76 E 824.34 N 957.05 E 871,53 N 1011.34 E 918,72 N 1065.62 E 935.59 N 1085.03 E 965.75 N 1119.72 E 1001.87 N 1161.27 E 1012.05 N 1172.90 E 1058.10 N 1225.95 E 1066.51 N 1235,64 E 1104.99 N 127:9.53 E 1150.30 N 1330.39 E 1154,31 N t334.85 E I206,00 N 1391.82 E I259.98 N '~450.35 ;E 1316,14 N I5~[0.32 E 1374.37 N ~ 571.62 E Grobal Coordinates Dogleg Vertical N orthi rigs Eastin gs Rate Secfi on ffi) (ft) (°/10~t) (fi) 5998896.31 N 651765,53 E 2.000 489.63 5998929,50 N 681801.89 E 2.000 537.97 5998964.71 N 681840.47 E 2.000 589.28 5999001.91 N 681881.22 E 2,000 643.47 5999041.05 N 681924.09 E 2.000 700.49 599907~.85 N 681957.84 E 2,000 745.36 5999062.09 N 681969.05 E 2,250 760.27 5999125.13 N 682016.20 E 2,250 822.98 5999170.17 N 682065.55 E 2.250 888.60 5999217.15 N 682~7.01 E 2.250 957.04 59992322[2 N 682133.4t E 2.259 978.85 5999265.56 N 682170.04- E 0.000 1027.56 5999314.05 Iq 68~PP3.17 E 0.000 1098.21 5999362.55 N 662276.30 E o.aoo 1188.87 5999411.05 N 682329.42 E 0.000 1239,52 5999459.55 N 682352.55 E O.00O 1310,17 5999508,04 N 682_435.60 E 0.000 1380,82 5999525.3~ N 682454.67 E 0.000 140§,08 5999556.37 N 682488.62 E 1.000 1451,23 5999593.48 N 682529.28 E 1.000 1505,29 5999603.94. N 682540.74 E 0.0o0 1520.53 5999651.26 N 682592.58 E 0,00o I589.47 5999659.92 N 682602.06 E 0,000 I602.08 5999699.44 N 682645.00 E 2.500 1659.45 5999745.98 N 682694.75 E 2,500 1726.5I 5999750.09 N 6628992[0 E 2.509 1732.41 5999803.15 N 652754.81 E 2.5C0 1808.26 5999858,54 N 682812.01 E 2.5G9 1886.87 5999916.14 N r>82870,60 E 2.500 1968.08 5999975.83 N 682930,46 E 2.500 2051.74 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment Rate Increase @ 2.250°/100ft: 2875.49ft MD, 2715.92ft -I'VD End Dir, Sail @ 46.000": 3231.05ff MD, 2979.94~tTVi3 Formation Tendency @ t ,000°/100~t: 3835.75ft MD, 3400.001~ 'I'VD End D]r, Sail @ 44.579°: 3977.8911 MD, 3500,0~ft ']'VD Starl DIr @ 2.500°/100ft- 4118.28ff MD, 3600.00E TVD SV4 [Estimate] Conlfnued... x I9 May, 1998 - 11:27 - 2 - DrillCtuest Shared Services Drilling Point Mclntrye Measured Depth Incl. Az[m. Sub-Sea Depth Sperry-Sun Drilling Services Vertical Local Coordinates Depth Nodhings Eastings fit) fit) (ft) 4772.01 60.750 46.000 3946.12 3995.22 4800.00 60.750 46.0~) 3959.79 4008.89 4882.29 60.750 46.000 4000.00 4049.10 4900.00 60.750 46.000 4008.66 4057.76 5000.00 60.750 46.000 4057.52 4106.62 5100.00 60.750 46.000 4106.38 4155.48 5200.00 60.750 46.000 4155.24 4204.34 5300, O0 60.750 46.000 4204.! 0 4253.20 540~.00 60.750 46.000 4252.97 4302,07 ~.00 60.750 46.000 4301.83 4350, 93 5600.00 60,750 4 6,000 43:50.89 4399.79 5700.00 60.750 46;.000 4399,55 4448.65 5800.00 60.750 46,~ 4448,41 4497.5'J 5900.00 60.750 Z~,0~00 4497,28 4546.38 6000.00 60.750 46,000 4546.14 4595.24 6100.00 60.750 46.000 4595.GO 4644.10 6200.00 60.750 46.000 4843.86 4 692.96 6294,42 60.750 46.000 4690.00 4739.10 6300.0O 60.750 46.000 4692.73 4741.83 6400.00 60,750 46.000 4741.59 47:90.69 6500.03 60.750 46.000 4790.45 4839.55 651:9.55 60.750 48.000 4800.00 484.9,10 6600.00 60,750 46;.009 4839,31 4888,41 6700.00 60.750 46;. DO{) 4888, '[7 4937.27 6724.20 60.750 4~,000 4900,00 4949.10 6800.00 60.750 46,000 4937.O4 4986.14 6900.00 60.750 46,000 4985.~3 5035.00 7000.00 60.750 46,000 5034.76 5083.86 710D.0O 60.750 46.000 5083.62 5132.72 7200.00 $D.750 46.000 5132.48 5181.58 Proposal Report for P2-14 Wp3 PH 14'[7.52 N 1616.52 E 1434.48 iq 163,4.08 E 1484.36 N 1665.73 E 1495.09 N 1696.64 E 1555.70 N 1759.61 E 1616.3t N 1822.37 E 1676.92 N 1885.13 E 1737,53 N t347.89 E 17~'8.13 N 2010,66 E 1858,74 N 2073.42 E 1919.35 N 2136. t8 F_ 1979.98 N 2198.94 F_ 2040.57 N 2261.70 ~E 2101.18 N 2324.47 E 2161.79 N 2387`23 E 2222.40 N 2449.99 E 2283.00 N 2512.75 E 2340.23 N 2572.01 E 2343.61 N 2575.51 E 2404.22 N 2638.28 E 2464,83 N 2701.04 E 2476.68 N 2713,31 E 2525,44 N 2763,80 E 2586,05 N 2826.56 E 2600.72 N 2841.75 E 2646.66 N 2889.32 E 2707.26 N 2952.09 F 2767.87 N 30'[4.85 ic 2828.48 N 3077.61 E 266g.09 N 3140.37 E Global Coordinates Dogleg Vertical Northlngs Eastings Rate Section (ft) (ft) ff/'~ 00ft) (ft) 6000020.0.6 N 682974.3;0 E 2.500 2113.41 6000037.45 N 6829'91,45 E 0.000 2137.60 6000088.58 N 683041.87 E O.O00 2208;.73 6000099.56 N 683052,72 E 0.000 2224.04 6000161.68 N 683113.99 E 0.000 2310.47 6000223.79 N 683175.27 E 0.030 2396,91 6000285.90 N 683236,54 E 0.000 2483,34 6000348.02 N 683297.81 E 0.000 2569.78 600041'0.13 N 683359.08 E 0,000 2656.21 8000472.25 N 683420.36 E 0.000 2742,65 6000534.36 N 683481.63 E O,OOD 2823.08 6000596.48 N 683542.90 E 0.OOO 2915,52 6000658.59 N 683604.17 E 0,OOD 3001.:96 6000720.70 N 663665.4.5 E 0.000 3088.39 6GI39782.82 Iq 683726.72 E a.600 3174.83 6000844.93 N 68~3787.99 E 0.0D0 3261.26 6000907,05 N 68.3849.26 E 0.00D 3347.70 6000:965.70 N 663907.I2 E 0.0OO 3429.31 6000:969,16 N 683910.53 E 0.003 3434.13 6001031,28 N 68397'L8I E 0.0(30 352.0.57 6001093.39 N 684033.08 E 0.0{30 3607.00 6001105.53 N 684945,06 E 0.000 3523.90 600t f55.51 N 6840:94,35 E 0.0{30 3693.44 6001217.62 N 684155.62 E O.000 3779.88 6001232.65 N 884170,45 E O.000 3800.80 6~01279.73 N 684216,:90 E 0.000 3866,31 600134t.85 N 684278.17 E 0.000 3952.75 6001403.96 N 884339.44 E 0.000 4039.18 6001466.08 N 654400.71 E 0.000 4125,62 6001528.'[9 N 824461.99 E 0,000 4212,05 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment End Dir, SalJ @ 60.750° · 4772,01ff MD, 3395,22ft 'T'VD Top Stuck Pipe Zone T-3 tcFr61 SV1) Bottom S~ck Pipe Zone 10 3,¢4" Oasfng Continued... 0 19 May', 193E - 11:27 - 3 - DrillQue~! Shared Services Drilling Point Mcintrye Msasured Depth Incl. Azim. Sub-Sea Depth Sperry-Sun Drilling Services Vertica~ Local Coordinates Depth Northings Eastings (/t) (ft) 7205/[5 60.750 46,000 5135,O0 5'[84.1~0 7237.69 60.750 46. 000 5150.:90 5200.00 7300.00 61.655 45. 022 5180.92 5230.02 74 0D.iX) 6,.3.1:22. 43,Zl 88 5227.26 5276.35 7432.36 6;3.60{) 43,000 5241o77 5290.87 7500.00 63.595 42.907 5271.85 53:20, 95 76i)0,00 63,557 42.770 5316.33 5365,43 7700,00 63,579 42.633 5360.82 5409,92 7800.00 63.572 42.496 5405.32 5454,42 7900.00 63.565 42.359 5449.83 5498.93 8000.00 63.557 42,-222 5494.36 5543.46 6I 00.0D 63.550 42.085 5538,89 5587.99 8200.00 63.543 41,948 5583,44 5632.54 8300.00 63.537 41,810 5628.00 5677.10 8400, 00 63.530 41,673 5672.57 5721.67 8500.00 63,523 41453§ 57~ 7.14 5766,2zj 8600.60 63,517 41.399 5761.73 5810,83 8700.00 63,511 41.261 5606.33 5855,43 8800.00 63.504 41.124 5650.94 5900,04 8900.00 63,4.98 40.987 5895.5§ 5944-.66 9000.00 63.493 40.850 5§40.18 5989.28 9100.00 63.487 ZI0.712 5984,82 6033.92 9200.00 63.481 40,575 6029.46 6078.56 ~300, CO 63.476 40.438 6074.12 6123.22 94~0.(}0 63.470 40.300 6I 18.78 6167.88 9500.00 63.465 40.163 6163.45 6212,55 9600.00 63.4~0 40.026 6208/[3 6257.23 9700.00 63.455 39.888 6252.82 6301.92 9800.00 63.450 39.751 6297.51 6346.61 9900.00 63.445 39.613 6342.21 6391.31 Proposal Report for P2-14 Wp3 PH 2892.2.1 N 3143.60 E 2911.93 N 3'[64.03 E 2950.20 N 3202.98 E 3013.67 N 3284.81 E 3034.74 N 3284.6'2 E 3079,08 N 3325.91 E 3144,75 N 3385.80 E 3210.57 N 3447.54 E 3276.53 N 35(E1.12 E 3342.62 N 3568,53 E 3408.86 N 3628.78 E 3475.24 N 3688~87 E 354~.75 N 3748.79 ~ 3608.41 N 3808.56 E 3675.21 N 3868.I6 E 3742.14 N 3927.59 E 3809.2~ N 3986.87 E 3876.42 N 4045.97 E 3943,77 N 4104.92 E 4011,26 N 4163.70 E 4 078.88 N 4222,31 E 4146.64 N 4280,76 E 4214.53 N 4339.04 E 4252.57 N 4397.16 E 4350.73 N 4455.11 E 4419.04 N 4512.90 E .4487.48 N 4570.52 E 4558.05 N 4627.97 E 4624,76 N 4 685.26 E 4693,60 N 4742.37 E Global Coordinates Do§leg Vertical Northi rigs Easti ngs Rate Section (ft) (ft) (onooft) (fi) 6001531.39 N 684465.f 4 E 0.000 Zl216.50 6001551.60 N 684485.08 E 0.000 4244.63 600'[590,80 N 684523.09 E 2.000 4298.79 600'[ 655.75 N 684583.36 E :2.000 4366.89 6001677.30 N 664602.66 E 2.00O 4415.70 6001722.63 N 684642.85 E 0, I23 4476.05 6001789.76 N 684702.14 E 0,123 4565,34 6001857.03 N 68A781.28 E O, 123 4654.62 6001924.44 N 68482.0.21 E 0.123 ¢743,91 600199~.98 N 6~zI879.01 E 0.1:23 4833.21 6002059.66 N 6,54937.63 E 0,1:23 4922,52 80021:27.48 N 684998.09 E 0.1:23 5011,84 8002195.43 N 68,5.054.38 E 0,123 5101.16 6002263.52 N 685112.51 E 0.123 5190,50 6002331.74- N 685170.47 E 0.123 5279.85 6002460.10 N 685228.27 E 0.123 5369,20 6002468.59 N 68528=5.89 E 0.123 5458.56 6002537.2_2 N 685343.35 E 0.123 5547.93 6002605.97 N 685400.64 E 0.123 5837.30 6002674.87 N 685457.77 E 0.123 5726.68 6002743.89 N 685514,72 E 0/[23 5816.07 60028'~3.05 N 685571,51 E 0.123 591)5.46 8002882.34 N 61~5628,13 E 0.123 5994.86 600295~[.76 N 68568,4.5.8 E 0.123 6084:26 6003021.32 N 6~5740.85 E 0,123 6173,67 6003091.00 N 685796.97 £ 0,123 6263.08 6003160.82 N 685852.9t E 0.123 6352,49 6903230.77 N 68590&68 F_. 0.123 6441.:91 6003309,85 N 685964.28 E 0.12;3 653'~,33 6003371,O6 N 686019.71 E 0.123 6620,75 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Co~nrnent UGi4A (K-15) Slad D]r @ 2.090"/100ff: 7237,69ff MD, 5200.00fl TVD BHA Tendency @ 0.123°/100ft· 7432,~ff MD, 5290.87fl TVD Conb'nued... 13 May, 1998 - 1 I:27 .4 - DrfllQuest Shared Services Drilling Point Mclntrye Measured Depth Incl. Azlm. Sperry-Sun Drilling Services Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings ffq (f~) (f~) (fi) "[ 0000.00 63,441 3 g,476 6386.92 6436.02 I01 OD.OD 63,436 39,339 6431.63 6480.73 1020D.DD 68.432 3S.201 6476,36 6525.46 10309.00 53.428 39.064 6521.09 6570.~ 9 10400.00 63.424 38.926 6565.82 6614.92 10'500.01) 63.420 38.789 6610.56 6659.66 10§00.00 63.416 38.65t 6655.31 6704.4I 1070'9.00 63.4 '[2 38.514 6700.07 6749,17 1080,0.00 63.409 38.376 6744.;92 6793, 92 1Og00.00 63.406 38,239 6789.59 6;838, 69 11000.00 6,3,4 0"2: 38.101 6834.36 6883.,46 ~J 1073.70 63.400 38.000 6867.36 6916,46 11100.00 63,4 DD 38.000 6879.13 6928.2.:3 11200.00 63.4 ID0 38.000 6923.9'[ 6973.01 11300.00 63.400 $8.000 6968.68 7017,78 1 ~1400.00 63,4CO 88.000 7013.46 7062 .55 I ~ 500.00 63 AgO 38.000 7058.24 7'[ 07.34 I'[503.94 63,400 38.000 7060.00 7109.10 11599.52 63.400 38.000 7102.80 715~.90 11600.00 63.400 38, O0O 7103.01 7152.11 11700.00 63.400 38. DDO 7147.79 7196.89 11BO0.O0 63.400 38.000 7192,56 7241.66 11900,O0 63.400 3B,00O 7237,34 7286.44. 1:2000,00 63.400 38,04)0 7282,1:2 7331.22 12100,O9 63.400 38,000 7326,89 7375.99 122(72.00 63.400 38.000 7:371,67 7420.77 12300.00 63.400 38.000 7416,44 74(15.54 12400.00 63.400 38.000 7461.22 7510.32 12500.00 63.400 38.000 7506,(30 7555:[0 1~-600.00 63.400 38.000 755rJ,77 7599.87 Proposal Report for P2-14 Wp3 PH 4762.58 N 4799.32 E 4834.69 N 4856.I1 E 4900.93 N 4912.72 E 4970.'31 N 4969.'~7 E 5039.82 N 5025.45 E 5109.46 N 508-[.55 E 5179.2,8 N 5737.49 E 5249.I4 N 5193,26 E 5319.18 N 5248.66 E 53~9.34 N 5304.29 E 5459.64 N 5359.56 E 5511.54 N 5400.17 E 5530.07 N 5414.65 E 5600.53 N 5A69.70 E 5670,99 N 5524.75 E 5741,45 N 5579.80 E 58 ~ 1,91 N 5834.85 E 5814,68 N 5837.02 E 5882,03 N 5889,64 E 5882.37 N 5689.90 E 5952,83 N 5744,95 E 6023.29 N 580'3,00 E 6093.75 N 5855,05 E 6"[64_21 N 5910,10 E 6234.67 N 5965,15 E 6305.13 N 6020.20 E 63'75.59 N 6075.25 E 6446.05 N 61;30,30 E 6516.51 N 6185,35 E 6586.97 N 6240.40 E Global Coordinates DogTeg Vertical Nor[hi ngs Easti ngs R ate Section (ft) (fi) (°/100fi) (fi) 6003441,40 N 686074.97 E 0.123 6710.17 6003511.86 N 686130.06 E 0.123 6799.60 6003582,46 N 686184.97 E 0.123 6889.02 6003653,19 N 686239.72 E 0.123 6978.45 6003724,04 N 686294.29 E 0.123 7067.87 6003795,03 N 686348.70 E 0.123 7157.30 8003866.14 N 686402.92 E 0.123 7248.73 6003937.38 N 686456.98 E 0.123 7336.15 6004008.74 N 666510.87 E 0.123 7425.57 6004080.24 N 686564.58 E 0,123 7514.99 6004151.86 N 686618.11 E 0.123 7604.41 6004204.72 N 686657.46 E 0.123 7670.31 6004223.60 N 68667'[.48 E O,OOD 7693.83 6004295.37 N 686724.81 E O. O00 7783.24 6004367.15 N 686778.13 E O. O00 7872.66 6004438.93 N 686831.45 E O,ODD 7962.07 6004510.70 N 686854.78 E O,0DD 8051.49 6004513.53 N 66688;6.88 E 0,0DO 8055.01 6004582.1:4 N 686937.85 E 0.0OD 8140.48 6004582.48 N 686936,T0 E O.0D0 8140.90 6004654.25 N 686991.42 E 0.000 8230.82 6004726.03 N 687044,75 E 0.0.1)0 8319.73 6004797.80 N 687098,07 E 0.000 8409.15 6004869.58 N 687151,39 E 0.1%'-~0 8498,56 6004941.36 N 687204,7'[ E 0.00O 8587.98 6005013.13 N 687258,04 E 0.0gO 8677,39 60050EN.91 N 687311.36 E 0.000 876-6.81 6005156.68 N 68736.4.68 E 0.000 88,56,2:2 6005228.,46 N 6~7418.01. E 0.000 8945,64 6005300.2:4 N 687471.33 E 0.000 9035,05 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment Ertd DiT, Sail @ 63.400° ' t-[073.70f1 MD, 6916.46ff TVD West Sak Top Co[vi lie [Es[imate] x 19 May, 1998 - 11;27 - 5. DriltQuest Shared Services Drilling Point Mclntrye Me=sured Depth IncL Azim. Sub-Sea Depth (r~) Sperry-Sun Drilling Services Vertical Locat Coordinates Depth North in gs Eastin gs (st) (ft) (ft) t 2700.00 63.400 38.009 7595.55 7644.65 12800.00 63.400 38.000 7640.32 7689.42 12900.00 63.400 3~.000 7685.10 7734.20 1' 3000.00 63.400 38,000 7729.88 7778, 98 13100.00 63.401) 38.{~0 7774.65 7823,75 13209.00 63.40~ 38.000 78I 9.43 7866.53 1330'0.00 6.3.4(~3 38.000 7864.20 7913.30 ~ 3400.00 63.400 38.000 7~ 08.96 7958.08 13500.00 63,400 38:.000 7953,75 8002.85 1' 3600.00 63.400 38.00O 7998.53 8647.63 13700.00 63.400 38,000 8043,31 6092,41 13800.00 63.400 38,0'00 6088.08 6137.18 13900,00 63.403 38.600 8132.86 8181 14~)00 .O0 63.4~,3 38.000 8177.63 8226.73 14100.00 63.zKI0 38.000 8222.41 827! ,51 14200.00 63,400 36.000 8267.1'9 8316.29 14300.00 63.400 36.000 8311,9§ 8361'.06 14400.00 63.400 38,000 8356,74 8405.84 14460.30 63.400 38.000 8392.70 8441.80 14500.60 63.278 37.12,° 8401.53 8459,&3 "14600.00 62.740 32.681 8446.94 8496,04,. 14700.00 62.345 28.195 8493.06 8542,16 14800.00 62.094 2;:3.682 8539.69 8586.79 14900.00 61.99'[ 19.1.55 8586.59 8635.69 15000.00 62.037 14.625 8633.54 8682.64 15100,00 62.280 10.106 8680.30 8729.40 15200,00 62.570 5.608 8726.64 67'75,74 15300.00 69,053 1.144 8772.35 882:1.45 15400.00 ,63.676 356.723 88'[7.20 8866,30 1' 5500.00 64..,.,., .,~2 352.355 8660.97 8910.07 Proposal Report for P2-14 Wp3 PH 6657.43 N 6295.45 E 6727.89 N 6350.4.9 E 6798.35 N 6405.54 E 6868,81 N 6460,59 E 6939.2.7 N 6515.64 E 7009.73 N 6570.69 E 7080.19 N 6625.74 E 7150.66 N 6680.79 E 7221..f 2 N 6735.84 E 7291.58 N 6790.89 E 7362.04 N 6645,94 E 7432.50 N 691)0.99 E 7502.96 N 6956,04 E 7573.42 N 7011.09 E 7643.88 N 7066.14. E 7714.34 N 7121.19 E 7764.60 N 7176.24 E 7855.26 N 7231.29 E 7911.84 N 7275.50 E 7925,79 N 7286,23 E 7998,84 N 7337,20 E 8075.31 N 7382.15 E 8154.84 N 7420.83 E 8237.04 N 7453.08 E. 8321.51 N 7478.73 E 8407.83 N 7497.65 E 84.~5.59 N 7509.75 E 8584.35 N 7514.98 E 8673,69 N' 7513,31 E 8763.17 N 7594.,74 E Global Coordinates Dogleg Vertical Northt ngs Eastin gs Rate Section (ft) (ft) (°/~ OOft) (ft) 6005372,01 N 667524.65 E 0.000 9124..47 6005443.79 N 6875'77,9[~ E 0,000 9213.88 6005515.56 N 687631.30 E 0.0'00 9303.39 6005587.34 N 687684.62 E 0.0OO 9392.71 6005659.12 N 687737.94 E 0.000 9482.13 6005730.69 N 687791.27 E 0.000 9571.54 6005802.67 N 687844.59 E 0.000 9660.96 6005874.44 N 687897.91 E 0.000 9750,37 6005946,22 N 687951.24 E 0.000 9839.79 6006017.99 N 688004.56 E 0.00O 9929,20 6006089.77 N 658057.56 E 0,000 '[0018,62 6006161.55 N 661~111.20 E 0,000 1'0108.03 6006233.32 N 688164,53 E 0,000 10I 97.45 6006305.10 N 688217.85 E 0,ODD 10286.86 6006,376.87 Iq 688271.17 E 0.000 10376.28 6006446.65 N 688324.50 E 0.000 10465.69 6006520.43 N 688377.82 E 0.O00 10555.11 6006592.20 N 688431.14 E O.000 10644.52 6006649.84 N 688473.96 E 0.O00 10716,33 6006664.05 N 688484.35 E 4.000 10783.93 6006738.31 N 688533.54 E 4.000 10822.86 6006615.85 N 688576,61 E 4.000 10970.76 6006696.30 N 688613.$6 E 4,000 10997.19 6006979.26 N 688643.60 E 4.000 1108'[,74 6007084.32 N 688667.19 E 4.0,00 11164.00 6807151.08 N 688684.01 E 4.000 11243.56 6007239,10 N 688693.98 F__. 4.000 11320.04 6007327.97 N' 688697.05 E 4.000 11393.08 6007417.24 N 688693.21 E 4.000 1 ~482.26 6007506.4.9 N 6~,6682.48 E 4.000 11527,32 Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment Start Di=r @ 4.000VIOO:fl. - 14480,30E MD, 8441.80:fl. TVD Continued... z 19 May, 19~B - 11:28 - E - Dri$$Quest Sperry-Sun Drilling Services Proposal Report for P2-14 Wp3 PH Shared Services Drilling Point Mclntrye Measured Sub-Sea Vertical Local Coordinates Deplh Incl, Azim. Depth Depth Norlhings Eastings (ft) (ft) (ft) (n) (ft) Global Coordinates Dogleg Vertical Northrngs Eastings Rate Section (fi) (ft) (°/100ft) 15577.47 65,1~,6 :34,9.011 6594.00 8,943.10 8832.31 N 7493.39 i::: 15600.00 65.316 348.046 6903.45 5952.55 8852.36 N 7489,33 E 15661.89 65,924 345.411 8929.00 6978.10 8907.22 N 7476,38 E 15700.00 66.321 343.1~02 8944.43 8993.53 8949,51 N 7467.13 E 15711.42 66.443 34,3,321 6949.00 8998,10 8950,85 N 7464.17 E 15738.58 66.718 342.266 8959.00 9008.10 8972,90 N 7457,34 E 6007575.33 N 666669.45E ~000 11574.66 6007595.27N 668664.90 E ~000 11587,91 600764.9.60 N 685650,63 E ~000 11623,04 6007683.16 N 688640.57 E 4,(]~0 11643.74 6007693.12 N 68863~36 E 4,000 11649.80 600771&00 N 66863~00 E 4,000 11662.92 15600.00 66.718 342.266 8984.07 9033.17 91:)2.8.39 N 7439. B0 E 15690.65 66.718 342,266 90~9.90 9069,00 9107.70 N 7414:23 E 15900_00 66.718 342,266 9023.59 9072,69 9115.88 N 7411.62 E 16000.00 66.718 342,266 9063.12 9~12,22 92:03.37 N 7363.64 E 160~4.87 66.718 342,266 9069.00 9118,10 9216.39 N 7379.48 E I6100.00 66.718 342.265 9102.65 9151.75 9290.87 N 7355.66 E 16154.88 66.715 342.266 9124.34 9173,44 9338.B8 6007770.04 N 688610,91E 0.000 11695.58 6007848.72N 688583.63 E 0.000 11742.26 6007856,83N 688580.82 E 0.000 11747.08 600794-3.62 N 688550~2 E 0.000 11798457 6007956.53N 686546.25 E 0.000 11806,23 6008030.40 N 6B6520.63 E 0,0O0 11850.07 6008078.03 N 686504.11E 0.000 11878.33 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to RKB 37+12.1, Northings and Eastings are relative to Well Reference. The Dogleg SeveriLy is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 38.167° (True), Based upon Minfmum Curvature type calculations, at a Measured Depth of 16154.88ft., The Bottom Hole Displacement is 11878.33ft., in the Direct[on of 38.167° (True). Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment OM3 [K-lO) THRZ :Kalu bik arget,.Enri Dir, Sail @ 66.718": 15736.58fl MD 900B.10ft TVD u13~aTUK ' Target: P2-14 J(PH), 200.00 Radius., Geo~gical WOC To~al Depth' 16154,§8ft MD, 9173,4~ff q'VD x 19 May, 1998 - 1I:28 - 7- Dri[lQuest X Z I Shared Services DrilEng Well: P2-14 HA W Wp3 ] DrillQues( 10200 - 9800 - Scale'- linch = 48Oft ~E 30 60tO0 Eastings 68100 72100 590~.15 E M D, 9149.10 TVD MD, 9149. I~TVD ~2_-14 ST T2- Circle 9048.10 TVD - 9785.06~, ~322.74 E 77.466': t7t~l~E~tt tAD. 9C50.1 ~LTVD Dir ~ 8.0C4~/1t)0tt: 17024,661t MD,9032.EG~t TVD P2.I4 b-~ TI- Circ~ 904~.10 TVD- 9212.8l N, 725~.1I E - 10200 - 9800 ] % D~r Rate Decrease ~ 8,[3~7'11001t: 11~M4,3E~I MD, ~H:~9. I 0~ ' [ PROPEL TARG~ SU M~RY . . 1~: ~.~MD ~ I --.°.. I ~ 7 5~' Uner - 1~70,~ MD, ~97.07 ~D ~8600 I "' I' " I .... I I -8~0 ~ ~00 6~O ~0 ~ 72~ 7600 7 ~B' ~n~- 1~70,~ MD, ~97.07~D ~l~ linch = ~ iasflngs ~~ in Tree Noflh _ ~ .... ~~. ..' ... . ~~~.~:~.~,~.~ ~ ..................................... ~'"~ ....... ~ .................. : ................................................................................................. CM~ ~-!0- ~3 ~ ~o 1:::====:::=~~~:~?~====:==:-'~=:::===::~=f= ...... =:==::== .... := .... =:= ...... :~====== .... =~~~~~~~;;L_ ~-- i - ~ ~ .~'- ~ .' * = e : ~ -- ..-'~,~v/r.~-:~(i~a~,~a~LVO =. ~ ....... ~~,~~-- ...... ~ ............................................. ;~ .......... :~ ~ ....... ::: ................... ~ ~ ~ ............................................................................................................................................................................. .~Eu,zach - 9195. tO ~ I~oT o~~t' - '~ ~ale: 1inch = ~ Vedical Section ~o. ~m~h: 309.000' (T~e N~h) ~' Shared Services Drilling Point Mclntrye Measured Depth tncl, Azim, Sub-Sea Depth (fi) Vertical Depth (It) 154-70.00 64.191 353.659 88,t-7.97 8897.07 1.5500.00 63.845 351.355 8861.11 8910.21 15578,38 66,572 345.134 8894,00 8943.10 156E0,00 67,367 343.465 8902.46 8951,56 15673.27 70.186 337.950 8929.00 8976:[ 0 15700.00 71.256 335.989 8937.82 8986.92 15736.15 72.735 333.376 8949,(X) 8998.10 15771.29 74:205 330,876 8959.O0 9008.10 15800.00 75.427 328,861 8966.52 9015.62 15873.43 78.626 323.805 8983.01 9032.11 15880,73 78.626 323.805 8984.45 9033.55 1591}0,00 80,012 322.744 6988.02 9037.I2 16000,00 87,250 317.358 8999.12 9048.22 t 6044.35 90,470 315.000 9000,O0 9049.10 16100.00 90.634 310.550 8999.46 9048.[;6 16200.00 90.9'[7 302.555 8998.1 t 9047.21 16230.51 91.000 300.115 8997.60 9046.70 163~0.00 91.000 300.115 I]996.38 9045,46 19400.00 91.000 300.115 8994.64 9043.74 16500,130 91,000 300.115 8992.89 9041.99 '[6600.0'0 91.000 300.115 8991,15 9040.25 16700.00 91,0DO 300,115 8989.40 9038.50 16800.00 91.000 3~3,115 8997.66 9036.76 16900.00 9'[.000 300.115 8965.91 9035,01 17000.00 91.000 300.115 8984.16 9033,26 Sperry-Sun Drilling Services Proposal Report for P2-14 Wp3 HAW Local Coordinates North in gs Easti ngs (fi) (ft) 8736.34 N 7508.03 E 8763.08 N 7504-.52 I= 8832.68 N 7z~89.99 E 685'[.83 N 7484.61 E 89'[6.25 N 7Zl82.02 E 8939.47 N 7452.'[ 5 E 8970.54 N 7437.45 E 9~'0.32. N 7421.70 E. 9 024.27 N 7407.79 E 91)83_79 N 7368.13 E 9089.56 N 7363.90 E 9104-.74 N 7352.58 E 9180.83 N 7288.80 E 9212:.61 N 7258.11 E 99_50.59 N 7217,27 E 9310.10 N 7137.01 E 9325.96 N 7110.96 E 9860.82 N 7050.86 E 9410.99 N 6964.37 E 9461,15 N 6877.88 E 9511.32 N 6791.39 E 956'[.49 N 6704.90 E 96l 1.65 N 6618,41 E 9661.82 N 6531,95 E 9711.99 N 6445.44 E Global Coordinates Dogleg Yertica! Northi ngs Easti ngs Rate Section (ft) (~t) (°/100fi) (fi) 6007479.74. N 668686.42 E -336.8,8 6007506,38 N 688682.26 E 7.000 -,317.32 6007575.61 N 688666.04 E 8.000 -262.25 6007594.63 N 688660.19 E 8,000 -245.99 6007658.48 N 68[[636.05 E 8,000 -187.90 6007681.45 N 688625.62 E B.000 -165.b'2 6007712,16 N 688610.17 E B.000 -134.64 6007741.54 N 688593.70 E 8.000 -103.66 6007765.16 N 688579.22 E 8.000 -77.78 6007823.69 N 688538.12 E 8,000 -9.50 6007829.36 N 666533.75 E 0.000 -2.58 6007844..26 N 688522.06 E 9.000 15.77 6007918.78 N 688456.46 E 9.OO0 113.22 6007950,00 N 688425.00 £ 9.000 I57.20 6007966.79 N 68838,3.26 E 8.000 212,72 6008044.32 N 68.8301.58 E 8.000 312:.53 6008059.55 N 688275.15 E 8.000 342.76 6008092,94 N 688214.22 E 0.000 41.[ 6008140,99 N 688126.54 E 0.OD0 510,20 6008189.05 N 688038.86 E 0,000 608,98 6008237.10 N 687951,17 E 0.000 707.77 6008:285.~ 5 N 687863A9 E 0.000 806.55 6008333.20 N 687775.81 E 0.0~0 905.34 6008381.25 N 687688.'[3 E O.0OD I004-.12 6008429.31 N 687600.45 E 0,000 1102.91 Aiaska State Plane Zone 4 Point Mclntyre Pad 2 Comment Tie-on Start DIr @ 7J300°/100ff: 154-70.00'h MD, 8897.07ff TVD 7 5/8~'~asing Dir Rate increase @ 8.~430°I100ft· 15500.00[t MB, 8910.2'[tt "r¥D CM3 (K-10} THRZ Kalubi k KupBruk End IDir, Sail @ 76.626°: 15873.4,3lt MD, 9032.11ft'l'VD Starl Dir @ 9.000°ll00ft: 15880.73[I MD, 9033.55'g TVD Dir Rate Decrease ~' 8.00O°/1001t: 16044.35tl MD, 9049.10ft TVD Target: P2-14 ST T1,200.00 Radius., Geolo~ilc.~] Eqc[ Dir, Sail @ 91.000" ' '[6230.51ft MD, 9045.701I '[VID x z Continued... 19 May, 1998 - 11:23 - 1 - DriflQuest o~ Sperry-Sun Drilling Services Proposal Report for P2-14 Wp3 HA W Shared Services Drilling Point Mclntrye Measured Sub-Sea Vertical Local Coordinates Depth Incl. AzJm. Depth Depth N o rthin gs East[ng s (ft) eft) (fi) (~t) (ft) 17024.66 9'[.000 300.115 8,983.73 9032,83 97:24.36 N 6424.ll E 17100.00 85.::207 301.777 8986.23 9035,33 9763.06 N 6359.56 E 17142.63 8t_930 302.728 8991 .DO 9040.10 9785.66 N 6323.74 E 17198.56 77.456 302.727 9001.00 9050.10 9815.40 N 6277.46 E 17200.00 77.456 31)2.727 :9091.32 9050.42 9816.16 N 6276.:28 E '[7300.00 77.456 302.727 9023.04 9072.14 9868,94 N 6194.16 E 17400.00 77.456 302.727 9044.76 9093.86 9921.71 N 6112.04 E 17500.00 77.456 302.727 9066.48 9115.58 9974.49 N 6029.92 E 17511.62 77.456 302,727 9069,00 9118.10 9980.62 N 6026.38 E 17600.00 77,456 302,727 9088.20 9137,30 10027.26 N 5947.81 E 17654.35 77.456 :302,727 9100.00 9149.1D ~0055.94 N 5903.18 E Global Coordinates Dogleg Vertical Northings Eas~tings Rate Section (f~) (f~) (°n 00ft) (f~) 6008441.16 N 667578.63 E 0.ODD 1127.27 6006478.26 N 687513.36 E 8.000 1201.79 6008500.D0 N 687477.00 E 8.000 1243.8~5 6008528.61 N 687430.01 E B,O00 1296.,53 6008529.35 N 687z~28.81 E 0.0(30 1299.93 60,0~560,11 N 6~7345.44 E 0.ODD 1396.96 6008;630,86 N 687262.06 E 0,000 14,93,99 6008681.64 N 687178.69 E 9.O0O 1591 6008687.54 N 687169.00 E O.O00 1602.29 6008732.4I N 687095.31 ~_. 0.000 1688.04 6008760,00 N 687050,0D E 0.000 1740.78 All data is in feet unless otherwise stated, Directions and coordinates are relative to True North. Vertical depths are relative to RKB 37+12.1. Northings and Eastings are relative to Well Reference. Tt~e Dogleg Sever]b/is in Degrees per ~00~t. Vertical Section is from Well Reference and calculated along an Azimuth of 309.000° (True}, Based upon M[nirnum Curvature type calculations, at a Measured Depth of 17654.35ft., The Bottom Hole Displacement is 11660.59ft., in the Direction of 30.414° (True). Alaska State Plane Zone 4 Point Mclntyre Pad 2 Comment Sl.~rt 13Ir @ 8.000°/100ff· 17024.66'11. MD, 9032.83frl TVD Target: P2-14 ST T2, 200.0D Radius., Geological End DIr, Sail @ 77.456° - 17198.56It MD, 9050.'[0~.TVD WOO Total Deplh ' 17654.35fl MD, 9149.10R-l-VD 4 112' Liner Target: P2-14 ST T3,200.D0 Radius., Geoleg[cat Continued... 19 May, Z995 - 11:23 · WELL PERMIT CHECKLIST FIELD & POOL COMPANY INIT CLASS WELL NAME /~ .-,,{,4/[~C~'f' ./1~~) PROGRAM: exp [] dev~"redrll [] serv [] wellbore seg ~1 ann. disposal para req [] GEbL/~RI~A ~.O. UNIT# //g,r~ ONIOFF SHORE O~ ADMINISTRATION 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING DATE 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ ; 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved, . . 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to v'~'~)OO psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ N N N ~:)N GEOLOGY 28. Work will occur without operation shutdown ........... ,~ N 29. Is presence of H2S gas probable ................. 'Y~ N 30. Permit can be issued w/o hydrogen sulfide measures ..... Y 31. Data presented on potential overpressure zones ....... .Y./~.. 32. Seismic analysis of shallow gas zones ............. 33. Seabed condition survey (if off-shore) ............. / Y N 34. Con, tact,nam, e/phon,e,-for weekly progress reports ....... ,.// Y N I expmramry omyj -- ~DpR DATE/ ANNULAR DISPOSAL 35. APPR DATE With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... Y N (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25,252 or 20 AAC 25.412. Y N GEOLOGY: ENGINEERING: UIC/Annular/- COMMISSION: -' JDH ,,~' 'RNC . .-'- co Comments/Instructions: M:cheklist rev 05/29/98 dlf:C:\msoffice\wordian\diana\checklist WELL PERMIT CHECKLIST COMPANY FIELD & POOL ~ ~'~7~.> INIT CLASS Z~_.~.-, /'-,o.,,~''/ ~,~iVl~ ~iJSTRATION .................. GEOL AREA UNIT# ///~,_'~"'¢'O ON/OFF SHORE 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. _D,~TE ,, 12. 13. Permit fee attached ....................... Lease number appropriate ................... Unique well name and number .................. Well located in a defined pool .................. Well located proper distance from drilling unit boundary .... Well located proper distance from other wells .......... Sufficient acreage available in drilling unit ............ If deviated, is wellbore plat included ............... Operator only affected pady ................... Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can be issued without administrative approval ...... Can permit be approved before 15-day wait ........... REMARKS ENGINEERING APPR_ DATE GEOLOGY APPR DATE) 14. Conductor string provided ................... N 15. Surface casing protects all known USDWs ........... N 16. CMT vol adequate to circulate on conductor & surf csg ..... N 17. CMT vol adequate to tie-in long string to surf csg ........ N 18. CMT will cover all known productive horizons .......... N 19. Casing designs adequate for C, T, B & permafrost ....... N 20. Adequate tankage or reserve pit ................. N 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. ~ N 23. If diverter required, does it meet regulations .......... .,...Y N 24. Drilling fluid program schematic & equip list adequate ..... (,.~ N 25. BOPEs, do they meet regulation ................ ~Y/~ N 26. BOPE press rating appropriate; test to ,5"oo~:> psig. N 27. Choke manifold complies w/API RP-53 (May 84) ..... '... ~'/N 28. Work will occur without Operation shutdown ........... 29. Is presence of H2S gas probable ................. 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N j ,. 31. Data presented on potential overpressure zones ....... Y,/I~ .,//../, ,~ 32. Seismic analysis of shallow gas zones ............. //Y N 33. Seabed condition survey (if off-shore) ............. ,/ Y N 34. Contact name/phone for weeklypro(3ress reports ..... ~ Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION' DwJ J DH_~~?,,,f RNC~ CO Comments/Instructions: A:\GEN. Misc\FORMS\cheklist rev 05198 dlf: C:\msoffice\wordian\diar]a\checklist Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * . . ****************************** . ............................ . ....... SCHLUFIBERGER ....... . ............................ . ****************************** COMPANY NAFiE : ARCO ALASKA INC. WELL N.~vlE : P2-14PB1 FIELD NAi~iE : POINT MCINTYRE BOROUGH : NORTH SLOPE STATE : ALASKA API NI]M~ER : 500292288870 REFERENCE NO : 98469 LI~S~'~ape Verification Listing Schlumberger Alaska Computing Center 6-0C~,~/998 11: 05 PAGE: . 1 **** REEL HEADER **** SERVICE NAM~ : EDIT DATE : 98/10/ 6 ORIGIN : FLIC REEL NAME : 98469 CONTINUATION # : PREVIOUS REEL : COMY~ENT : ARCO ALASKA INC, PT. MCINTYRE, P2-14PB1 #50-029-22888-70 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/10/ 6 ORIGIN . FLIC TAPE NAME : 98469 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA INC, PT. MCINTYRE, P2-14PB1, #50-029-22888-70 TAPE HEADER POINT MCINTYRE CASED HOLE WIRELINE LOGS WELL NAME: P2-14PB1 API NUMBER: 500292288870 OPERATOR: ARCO ALASKA INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 16-SEP-98 JOB NUMBER: 98469 LOGGING ENGINEER: S. DECKERT OPERATOR WITNESS: KIRK WHITE SURFACE LOCATION SECTION: 14 TOWNSHIP: 12N RANGE: 14E FNL : 16 FSL: FEL: FWL: 1157 ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: 46.85 GROUND LEVEL: 11.70 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) lST STRING 9. 875 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEAS~ DEPTH) LI~ ~ape Verification Listing Schlumberger Alaska Computing Center 6-oc~98 11: 05 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GR CCL REMARKS: CONTAINED HEREIN IS THE GR/CCL/TENS DATA ACQUIRED ON ARCO ALASKA, INC. WELL P2-14PB1 ON 21-JUL-98. NO DEPTH SHIFTS WERE APPLIED TO THIS DATA AS IT IS THE PRIMARY DEPTH CONTROL DATA. $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/10/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GR 15870.0 12844.0 CCL 15859.0 12844.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH .......... EQUIVALENT UNSHIFTED DEPTH .......... GR CCL .............. REMARKS: THIS FILE CONTAINS THE CLIPPED GR/CCL/TENS DATA FROM LI~-Tape Verification Listing Schlumberger Alaska Computing Center PAGE: THE MAIN PASS. ONLY ONE PASS WAS LOGGED. NO DEPTH SHIFTS WERE APPLIED TO THIS DATA AS IT IS THE PRIMARY DEPTH CONTROL DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1224601 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH GR GAPI 1224601 O0 000 O0 0 1 1 1 4 68 0000000000 TENS GR LB 1224601 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CCL V 1224601 O0 000 O0 0 1 i 1 4 68 0000000000 ** DATA ** DEPT. 15870.000 GRCH. GR 33.396 TENS. GR 4247.000 CCL. CCL DEPT. 12844.000 GRCH. GR 48.574 TENS.GR 3429.000 CCL. CCL -999.250 0.000 ** END OF DATA ** LI~=~ape Verification Listing Schlumberger Alaska Computing Center 6-0d~-~i~998 11: 05 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01COi DATE : 98/10/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAFiE : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE · 98/10/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 2 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NDT~BER: 1 DEPTH INCREmENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 15929.5 12843.0 GR LOG HEADER DATA DATE LOGGED: 21-JUN-98 SOFTWARE VERSION: 8Cl-205 TIME LOGGER ON BOTTOM: 1801 21-JDTV-98 TD DRILLER (FT) : 16207.0 TD LOGGER (FT) : 15870.0 TOP LOG INTERVAL (FT) : 12870.0 BOTTOM LOG INTERVAL (FT) : 15868.0 LOGGING SPEED (FPHR) : 2800 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CCL CALIPER GR GAF~4A RAY $ BOREHOLE AND CASING DATA OPeN HOLE BIT SIZE (IN): TOOL NUFIBER ATT-B 9. 875 LI's Tape verification Listing Schlumberger Alaska Computing Center 6-0C~'998 11:05 PAGE: DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE C01VDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 3~KCL 10.80 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): FAR COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE (CPS): NEAR COUNT RATE HIGH SCALE (CPS): TOOL STANDOFF (IN): REMARKS: LOGGED IN 5.5" DRILL PIPE. INTERVAL LOGGED TDL TO 12870' AS REQUESTED MAXIMUM LOGGING SPEED: 2800 FPH THIS FILE CONTAINS THE RAW GR/CCL/TENS DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 $ 66 6 73 LIS'-~ape Verification Listing Schlumberger Alaska Computing Center 6-00~1998 11:05 PAGE: 6 TYPE REPR CODE VALUE 7 65 8 68 0.5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFiB SAMP ELE~ CODE (HEX) DEPT FT 1224601 O0 000 O0 0 2 1 1 4 68 0000000000 GR PS1 GAPI 1224601 O0 000 O0 0 2 1 1 4 68 0000000000 TENS PS1 LB 1224601 O0 000 O0 0 2 1 1 4 68 0000000000 CCL PS1 V 1224601 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 15929.500 GR. PSi DEPT. 12843.000 GR.PS1 0.000 TENS. PSi 1005.000 CCL.PS1 0.000 54.888 TENS.PSi 3422.000 CCL.PS1 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/10/ 6 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LI~"i~ape Verification Listing Schlumberger Alaska Computing Center 6-0~'~998 11: 05 PAGE: **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/10/ 6 ORIGIN : FLIC TAPE NA~E : 984 69 CONTINUATION # : 1 PREVIOUS TAPE : COM~F~VT : ARCO ALASKA INC, PT. MCINTYRE, P2-14PB1, #50-029-22888-70 **** REEL TRAILER **** SERVICE NAFIE : EDIT DATE : 98/10/ 6 ORIGIN : FLIC REEL NAME : 98469 CONTINUATION # : PREVIOUS REEL COM~2VT : ARCO ALASKA INC, PT. MCINTYRE, P2-14PB1 #50-029-22888-70 Sperry-Sun Drilling Services LIS Scan Utility Fri Oct 16 10:42:01 1998 Reel Header Service name ............. LISTPE Date ..................... 98/10/16 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Services Tape Header Service name ............. LISTPE Date ..................... 98/10/16 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Services Scientific Technical Scientific Technical Physical EOF Comment Record TAPE HEADER POINT McINTYRE MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 5 AK-MM-80246 M. HALL C.DIXON 500292288800 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 16-OCT-98 MWD RUN 7 MWD RUN 8 AK-MM-80246 AK-MM- 80246 G. TOBIAS G. TOBIAS C. DIXON C. DIXON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: MWD RUN 9 AK-MM-80246 G.TOBIAS C.DIXON MWD RUN 10 MWD RUN 11 AK-MM-80246 AK-MM-80246 G.TOBIAS M. PIALL C.DIXON K.WHITE 14 12N 014 FNL: 16 FSL: FEL: FWL: 1157 ELEVATION (FT FROM MSL 0) KELLY BUSHING: .00 DERRICK FLOOR: 46.80 GROUND LEVEL: 11.70 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 30.000 20.000 129.0 3RD STRING 13.500 10.750 6711.0 PRODUCTION STRING 9.875 16194.0 REMARKS: 1. ALL DEPTH REFERENCES ARE SHIFTED TO THE THROUGH-DRILLPIPE GAMNiA P~AY OF 6/21/98, AND TRUE VERTICAL DEPTHS ARE CALCULATED FROM GYRO DATA SURVEY OF 6/21/98 TO THE KICKOFF POINT FROM P2-14 PB1, AND FROM DEPTH-SHIFTED MWD SURVEYS TO TOTAL DEPTH (TD) OF P2-14 PER INSTRUCTIONS OF T WALKER OF ARCO ALASKA, INC. ATTACHED GYRO/MWD SURVEY LIST IS UNOFFICIAL. 2. ALL VERTICAL DEPTHS ARE SUB-SEA TRUE VERTICAL DEPTHS (SSTVD) . 3. RUNS 1-4 ARE DIRECTIONAL ONLY AND NOT PRESENTED. 4. MWD RUN 5 IS DIRECTIONAL WITH DUAL G~dv~W3~ P~AY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE RESISTIVITY PPIASE-4 (EWR4). FULL TOOL MEMORY CAUSED THE LOSS OF RECORDED EWR4 DATA FROM 13474'MD, 7887' SSTVD TO 13882'MD, 8082'SSTVD (KICKOFF POINT FROM P2-14 PB1). ONLY REALTIME (SHALLOW, DEEP) RESISTIVITY IS PRESENTED IN THIS INTERVAL. 5. MWD RUNS 7-11 ARE DIRECTIONAL WITH DGR, AND EWR4. 6. MWD RUNS 5, 7-11 REPRESENT WELL P2-14PB1 WITH API#: 50-029-22888-00. THIS WELL REACHED A TD (SHIFTED) OF 16999'MD, 9118'SSTVD (SHIFTED). SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA-SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR RPD RPM RPS RPX ROP FET $ Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. .5000 START DEPTH STOP DEPTH 6656.5 16954.0 6694.0 16961.0 6694.0 16961.0 6694.0 16961.0 6694.0 16961.0 6729.0 16999.0 6784.5 16961.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 6656.5 12903.0 12951.5 12952.5 12955.0 12957.0 12958.5 12960.0 12962.5 12964 0 13484 5 13501 0 13537 5 13540 0 13541 5 13742 0 13839 0 13874 5 13876 0 16999 0 $ MERGED DATA SOURCE PBU TOOL CODE MWD GR 6672.5 12919.0 12950.5 12952.0 12954.0 12956.0 12957.5 12959.0 12961.0 12963.5 13506.5 13522.5 13554.5 13556.0 13558.5 13762.0 13857.0 13890.5 13894.0 17017.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 5 6727.0 13882.0 MWD MWD MWD MWD MWD $ REMARKS: 7 13882.0 13390.0 8 13390.0 14451.0 9 14451.0 15362.0 10 15362.0 15940.0 11 15940.0 16999.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 Name Min Max Mean Nsam DEPT 6656.5 16999 11827.8 20686 ROP 4.201 6560.16 141.242 20541 GR 8.18597 333.466 81.3276 20573 RPX 0.3973 2000 5.53753 19615 RPS 0.1898 2000 6.40064 20431 RPM 0.108 2000 6.89968 19615 RPD 0.1875 2000 8.83987 20431 FET 0.1039 126.248 2.0072 20159 First Reading 6656.5 6729 6656.5 6694 6694 6694 6694 6784.5 Last Reading 16999 16999 16954 16961 16961 16961 16961 16961 First Reading For Entire File .......... 6656.5 Last Reading For Entire File ........... 16999 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 R_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 6672.5 RPD 6710.0 RPM 6710.0 RPS 6710.0 RPX 6710.0 ROP 6745.0 FET 6800.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 13900 0 13900 0 13496 0 13900 0 13496 0 13900 0 13900.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 15 - JI/N- 98 5.07 5.46 MEMORY 13882.0 6727.0 13882.0 60.8 65.8 TOOL NUMBER P1025CRG6 P1025CRG6 9.880 9.9 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 KCL CHEM 9.70 52.0 9.5 1400 4.0 1.450 .780 .860 1.750 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD 5 FT/H 4 1 68 GR MWD 5 API 4 1 68 RPX MWD 5 OHMM 4 1 68 RPS MWD 5 OHMM 4 1 68 RPM MWD 5 OHMM 4 1 68 RPD MWD 5 OHMM 4 1 68 FET MWD 5 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 56.1 Name Min Max DEPT 6672.5 13900 ROP 4.201 6560.16 GR 8.18597 128.571 RPX 0.3973 25.7184 RPS 0.1898 35.8089 RPM 0.108 2000 Mean Nsam 10286.2 14456 177.744 14311 78.1561 14456 3.01082 13573 3.28585 14381 3.7719 13573 First Reading 6672.5 6745 6672.5 6710 6710 6710 Last Reading 13900 13900 13900 13496 13900 13496 RPD 0.3479 2000 5.81468 14381 FET 0.1039 12.3202 1.02379 14109 6710 6800.5 13900 13900 First Reading For Entire File .......... 6672.5 Last Reading For Entire File ........... 13900 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Sez-vice Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record. o65535 File Type ................ LO 'Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RLTNNUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 13900.5 14347.0 RPD 13900.5 14347.0 RPM 13900.5 14347.0 RPS 13900.5 14347.0 RPX 13900.5 14347.0 GR 13900.5 14354.5 ROP 13900.5 14409.5 $ LOG HEADER DATA DATE LOGGED: 27-JLTN-98 SOFTWARE SURFACE SOFTWARE VERSION: 5.07 DOWNHOLE SOFTWARE VERSION: 5.46 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT) : 14390.0 TOP LOG INTERVAL (FT) : 13882.0 BOTTOM LOG INTERVAL (FT) :_ BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DU~dL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERJ~TURE (MT): MUD AT MAX CIRCULATING TERMPEP~ATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL FLATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STAi~DOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 14390.0 47.2 60.8 TOOL NUMBER P1025CRG6 P1025CRG6 9.880 9.9 KCL CHEM 10.50 42.0 8.5 16000 2.6 .680 .382 .250 .800 54.4 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 7 API 4 1 68 4 2 RPX MWD 7 OHMM 4 1 68 8 3 RPS MWD 7 OHMM 4 1 68 12 4 RPM RPD ROP FET MWD 7 MWD 7 MWD 7 MWD 7 OHMM 4 1 68 OHMM 4 1 68 FT/H 4 1 68 HOUR 4 1 68 16 20 24 28 Name DEPT GR RPX RPS RPM RPD ROP FET Min 13900.5 82.9829 1 1847 1 9949 2 5068 2 6146 5 1023 0 8474 Max Mean Nsam 14409.5 14155 1019 131.476 108.701 909 3.3552 2.65663 894 3.8843 3.13067 894 4.0775 3.34144 894 4.3765 3.39218 894 392.344 60.0074 1019 7.695 3.26033 894 First Reading 13900.5 13900.5 13900.5 13900.5 13900.5 13900.5 13900.5 13900.5 Last Reading 14409.5 14354.5 14347 14347 14347 14347 14409.5 14347 First Reading For Entire File .......... 13900.5 Last Reading For Entire File ........... 14409.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH FET 14347.5 RPD 14347.5 STOP DEPTH 14406.5 14406.5 RPM 14347.5 RPS 14347.5 RPX 14347.5 GR 14355.0 ROP 14410.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 14406.5 14406.5 14406.5 14415.0 14469.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REM]LRKS: $ Data Format Specification Record Data Record Type .................. 0 28-JUN-98 5.07 5.46 MEMORY 14451.0 14390.0 14451.0 45.6 45.6 TOOL NUMBER P1025CRG6 P1025CRG6 9.880 9.9 GEM GP/KCL 10.50 43.0 9.5 18000 2.4 .700 .000 .500 .800 53.9 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD 8 API 4 1 68 RPX MWD 8 OHMM 4 1 68 RPS MWD 8 OHMM 4 1 68 RPM MWD 8 OHMM 4 1 68 RPD MWD 8 OHMM 4 1 68 ROP MWD 8 FT/H 4 1 68 FET MWD 8 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean Nsam DEPT 14347.5 14469 14408.2 244 GR 89.2274 109.913 101.368 119 RPX 1.8838 2.7143 2.3498 119 RPS 2.2159 3.4516 2.99086 119 RPM 2.4308 3.746 3.27827 119 RPD 2.5701 3.7122 3.33007 119 ROP 9.9448 151.865 25.3047 119 FET 25.1306 26.0095 25.4691 119 First Reading 14347.5 14355 14347.5 14347.5 14347.5 14347.5 14410 14347.5 Last Reading 14469 14414 14406.5 14406.5 14406.5 14406.5 14469 14406.5 First Reading For Entire File .......... 14347.5 Last Reading For Entire File ........... 14469 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 14407 . 5 15317 . 5 RPD 14407.5 15317.5 RPM 14407 . 5 15317 . 5 RPS 14407 . 5 15317 . 5 RPX 14407 . 5 15317 . 5 GR 14415 . 5 15325 . 0 ROP 14471.0 15379.5 $ LOG HEADER DATA DATE LOGGED: 01 - JUL- 98 SOFTWARE SURFACE SOFTWARE VERSION: 5.07 DOWNHOLE SOFTWARE VERSION: 5.46 DATA TYPE (MEMORY OR REAJ~-TIME) : MEMORY TD DRILLER (FT) : 15362.0 TOP LOG INTERVA3~ (FT) : 14451.0 BOTTOM LOG INTERVAL (FT) : 15362.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 39.8 MAXIMUM ANGLE: 71.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY P1025CRG6 EWR4 ELECTROMAG. RESIS. 4 P1025CRG6 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.880 DRILLER' S CASING DEPTH (FT) : 9.9 BOREHOLE CONDITIONS MUD TYPE: KCL CHEM MUD DENSITY (LB/G) : 10.50 MUD VISCOSITY (S) : 44.0 MUD PH: 9.5 MUD CHLORIDES (PPM) : 18000 FLUID LOSS (C3) : .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .340 MUD AT MAX CIRCULATING TERMPERATURE: .186 66.7 MUD FILTRATE AT MT: .200 MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type'. .... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .510 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 GR MWD 9 API 4 1 68 RPX MWD 9 OHMM 4 1 68 RPS MWD 9 OHMM 4 1 68 RPM MWD 9 OHMM 4 1 68 RPD MWD 9 OHMM 4 1 68 ROP MWD 9 FT/H 4 1 68 FET MWD 9 HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max Mean DEPT 14407.5 15379.5 14893.5 GR 77.7646 333.466 114.749 RPX 1.6069 4.6816 2.36758 RPS 1.9129 8.0491 2.93702 RPM 1.984 15.949 3.19936 RPD 1.9976 18.1842 3.23606 ROP 4.6395 945.286 37.2106 FET 2.0739 25.5071 6.45476 First Last Nsam Reading Reading 1945 14407.5 15379.5 1820 14415.5 15325 1821 14407.5 15317.5 1821 14407.5 15317.5 1821 14407.5 15317.5 1821 14407.5 15317.5 1818 14471 15379.5 1821 14407.5 15317.5 First Reading For Entire File .......... 14407.5 Last Reading For Entire File ........... 15379.5 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 15337.0 15884.0 FET 15370.0 15921.0 RPD 15370.0 15921.0 RPM 15370.0 15921.0 RPS 15370.0 15921.0 RPX 15370.0 15921.0 ROP 15382.0 15959.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ 07 -JUL- 98 5.07 5.46 MEMORY 15940.0 15362.0 15940.0 77.3 92.5 TOOL NIIMBER P1006GR4 P1006GR4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PM: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPER3kTURE (DEGF) MUD AT MEASURED TEMPEP~ATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Lo99in9 Direction ................. Down Optical lo9 depth units ........... Feet Data Reference Point .............. Undefined Frame Spacin9 ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 6.750 6.8 GEM GP 10.50 50.0 9.7 18000 2.6 .310 .148 .270 .330 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 10 API 4 1 68 4 2 RPX MWD 10 OHMM 4 1 68 8 3 RPS MWD 10 OHMM 4 1 68 12 4 RPM MWD 10 OHMM 4 1 68 16 5 RPD MWD 10 OHMM 4 1 68 20 6 ROP MWD 10 FT/H 4 1 68 24 7 FET MWD 10 HOUR 4 1 68 28 8 67.8 First Name Min Max Mean Nsam Reading DEPT 15337 15959.5 15648.2 1246 15337 GR 38.4945 98.6432 72.7494 1095 15337 RPX 0.7545 2000 26.1327 1103 15370 Last Reading 15959.5 15884 15921 RPS 0.9557 2000 29.7139 1103 RPM 0.2406 2000 28.7484 1103 RPD 0.1875 2000 36.0407 1103 ROP 15.595 390.988 73.5445 1156 FET 0.4764 126.248 3.49915 1103 15370 15370 15370 15382 15370 15921 15921 15921 15959.5 15921 First Reading For Entire File .......... 15337 Last Reading For Entire File ........... 15959.5 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 P~AW MWD Curves and loH header data for each bit run in separate files. BIT RUN NUMBER: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 15884.5 16972.0 FET 15921.5 16979.0 RPD 15921.5 16979.0 RPM 15921.5 16979.0 RPS 15921.5 16979.0 RPX 15921.5 16979.0 ROP 15960.0 17017.0 $ LOG HEADER DATA DATE LOGGED: 10-JUL-98 SOFTWARE SURFACE SOFTWARE VERSION: 5.07 DOWNHOLE SOFTWARE VERSION: 5.46 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA R3tY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULJ~TING TERMPEP~ATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MEMORY 16999.0 15940.0 16999.0 69.4 88.9 TOOL NVJMBER P1043GR4 P1043GR4 6.750 6.8 GEM-GP 10.50 46.0 9.8 18000 2.4 .300 .214 .290 .350 77.2 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 11 API RPX MWD 11 OHMM RPS MWD 11 OHMM RPM MWD 11 OHMM RPD MWD 11 OPIMM ROP MWD 11 FT/H FET MWD 11 HOUR 4 1 68 4 2 4 1 68 8 3 4 1 68 12 4 4 1 68 16 5 4 1 68 20 6 4 1 68 24 7 4 1 68 28 8 Name Min Max DEPT 15884.5 17017 GR 48.7523 95.3374 RPX 2.3805 32.014 RPS 2.5002 39.8877 RPM 2.5048 42.2663 RPD 2.6634 47.1836 ROP 7.0043 625.781 FET 0.5441 22.7301 Mean 16450.8 66 1681 15 1146 19 9479 20 4406 22 6207 67 5065 2.09731 First Last Nsam Reading Reading 2266 15884.5 17017 2176 15884.5 16972 2116 15921.5 16979 2116 15921.5 16979 2116 15921.5 16979 2116 15921.5 16979 2115 15960 17017 2116 15921.5 16979 First Reading For Entire File .......... 15884.5 Last Reading For Entire File ........... 17017 File Trailer Sea-vice name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/16 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/10/16 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Services Reel Trailer Service name ............. LISTPE Date ..................... 98/10/16 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Scientific Technical Services Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Tue Oct 06 15:54:15 1998 Reel Header Service name ............. LISTPE Date ..................... 98/10/06 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Services Tape Header Service name ............. LISTPE Date ..................... 98/10/06 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library° Services Scientific Technical Scientific Technical Physical EOF Comment Record TAPE HEADER POINT McINTYRE MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: MWD RUN 5 AK-MM-80246 M. HALL C.DIXON RECEIVED P2-14 PB1 500292288870 ARCO ALASKA, INC. OCT 1 4 1998 Alaska 0il & Gas Cons. Commi~o~ SPERRY-SUNDRILLING SERVICES 06-0CT-98 MWD RUN 6 AK-MM-80246 M.HALL K. WHITE 14 12N 014 16 1157 .00 DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 46.80 11.70 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 30.000 20.000 129.0 13.500 10.750 6711.0 9.875 16194.0 1. *ALL DEPTH REFERENCES ARE SHIFTED TO THE THROUGH-DRILLPIPE GAMMA RAY OF * '6/21/98, AND TRUE VERTICAL DEPTHS ARE CALCULATED FROM GYRO DATA SURVEY * · OF 6/21/98 PER INSTRUCTION. 2. ALL VERTICAL DEPTHS ARE SUB-SEA TRUE VERTICAL DEPTHS (SSTVD) . 3. RUNS 1-4 ARE DIRECTIONAL ONLY AND NOT PRESENTED. 4. MWD RUN 5 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) . 5. MWD RUN 6 IS DIRECTIONAL WITH DGR, EWR4, COMPENSATED NEUTRON POROSITY (CNP) AND STABILIZED LITHO-DENSITY. FULL TOOL MEMORY CAUSED THE LOSS OF RECORDED EWR4 DATA IN THE INTERVAL 13474'MD, 7887'SSTVD TO 14954'MD, 8592'SSTV-D. ONLY REAL TIME DATA (SHALLOW AkrD DEEP RESISTIVITY) IS PRESENTED. 6. MWD RUNS 5-6 REPRESENT WELL P2-14PB1 WITH API#: 50-029-22888-70. THIS WELL REACHED A TOTAL DEPTH OF 16194'MD, 9143'SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA-SI{ALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY (SS MATRIX, FIXED HOLE SIZE). SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATES. SNFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATES. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (BEST BIN). SC02 = SMOOTHED STANDOFF CORRECTION (BEST BIN). SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (BEST BIN). ENVIRONMENTAL PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: 9.875" MLrD FILTRJkTE SALINITY: 18500 PPM CHLORIDES MUD WEIGHT: 10.5 PPG FORMATION WATER SALINITY: 14545 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/06 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NIIMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. .5000 DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR RPD RPM RPS RPX ROP FET FCNT NCNT NPHI PEF DRHO RHOB $ START DEPTH 6656 5 6694 0 6694 0 6694 0 6694 0 6729 0 6784 5 14892.0 14892.0 14892.0 14903.0 14903.0 14903.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH 6656.5 12903 0 12951 12952 12955 12957 12958 12960 12962 12964 13484 13501 13537 GR 6672.5 12919 0 12950 5 12952 0 12954 0 12956 0 12957 5 12959 0 12961 0 12963 5 13506 5 13522 5 13554 5 STOP DEPTH 16152°0 16123.5 16123.5 16123.5 16123.5 16194.0 16123.5 16131 0 16131 0 16131 0 16141 0 16140 5 16140 5 EQUIVALENT UNSHIFTED DEPTH 13540 0 13541 5 13742 0 13839 0 13874 5 13876 0 14150 5 14151 5 14153 5 14155 5 14185 5 14333 5 14336 0 14359 5 14415 0 14694 5 14698 0 14699 5 14713 5 14716 5 14721 5 14832 0 15707 5 15710 0 15713 0 15763 5 15781 0 15787 0 15799 0 15834 0 16194 0 $ MERGED DATA PBU TOOL MWD MWD $ REMARKS: 13556 13558 13762 13857 13890 13894 14174 14175 14177 14178 14199 14352 14354 14379 14431 14713 14715 14718 14731 14733 14737 14847 15734 15737 15740 15790 15801 15807 15825 15847 16207 .0 5 0 0 5 0 0 5 0 5 5 0 0 5 0 5 5 0 0 0 5 5 5 0 0 5 0 5 5 0 0 SOURCE CODE BIT RUN NO MERGE TOP 5 6727.0 6 14954.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MERGE BASE 14954.0 16194.0 Name DEPT ROP Service Order Units Size Nsam Rep FT 4 1 68 MWD FT/H 4 1 68 Code Offset 0 4 Channel 1 2 GR MWD API RPX MWD OHMM RPS MWD OHMM RPM MWD OHMM RPD MWD OHMM FET MWD HOUR NPHI MWD PU-S FCNT MWD CNTS NCNT MWD CNTS RHOB MWD G/C3 DRHO MWD G/C3 SNP2 MWD BARN 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 8 12 16 20 24 28 32 36 40 44 48 52 3 4 5 6 7 8 9 10 11 12 13 14 Name Min Max DEFT 6656.5 16194 ROP 4.201 6560.16 GR 8.18597 335.129 RPX 0.3973 25.7184 RPS 0.1898 35.8089 RPM 0.108 2000 RPD 0.3479 2000 FET 0.1039 123.934 NPHI 23.7808 92.5489 FCNT 471.984 877.224 NCNT 2261.62 3040 RHOB 1.3471 3.1324 DRHO -0.523 0.6556 SNP2 2.8524 17.1536 Mean Nsam 11425.2 19076 159.975 18931 84.5124 18992 2.98356 16100 3.41071 18860 3.91489 16100 5.46001 18860 1.71867 18679 44.6359 2479 566.796 2479 2593.23 2479 2.52496 2476 0.059577 2476 5.67126 2477 First Reading 6656.5 6729 6656.5 6694 6694 6694 6694 6784.5 14892 14892 14892 14903 14903 14903 Last Reading 16194 16194 16152 16123.5 16123.5 16123.5 16123.5 16123.5 16131 16131 16131 16140.5 16140.5?~' 16141 First Reading For Entire File .......... 6656.5 Last Reading For Entire File ........... 16194 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/06 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/06 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 6672.5 14899.0 RPD 6710.0 14906.5 RPM 6710.0 13496.0 RPS 6710.0 14906.5 RPX 6710.0 13496.0 ROP 6745.0 14971.0 FET 6800.5 14870.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 15-JTJN- 98 5.07 5.46 MEMORY 14954.0 6727.0 14954.0 60.8 65.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P1025CRG6 P1025CRG6 BOREHOLE AArD CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 9.880 9.9 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERJATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL CHEM 9.70 52.0 9.5 1400 4.0 1.450 .78O .860 1.750 56.1 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 RPX MWD 5 OHMM 4 1 68 RPS MWD 5 OHMM 4 1 68 RPM MWD 5 OHMM 4 1 68 RPD MWD 5 OHMM 4 1 68 ROP MWD 5 FT/H 4 1 68 FET MWD 5 HOUR 4 1 68 GR MWD 5 API 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Min Max DEPT 6672.5 14971 RPX 0.3973 25.7184 RPS 0.1898 35.8089 RPM 0.108 2000 RPD 0.3479 2000 ROP 4.201 6560.16 FET 0.1039 12.3202 GR 8.18597 152.395 Mean Nsam 10821.8 16598 3.01082 13573 3.30285 16394 3.7719 13573 5.55525 16394 170.343 16453 1.04434 16049 82.088 16454 First Reading 6672.5 6710 6710 6710 6710 6745 6800.5 6672.5 Last Reading 14971 13496 14906.5 13496 14906.5 14971 14870 14899 First Reading For Entire File .......... 6672.5 Last Reading For Entire File ........... 14971 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/06 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/10/06 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 BIT RUN NIIMBER: DEPTH INCREMENT: FILE SUMM3LRY VENDOR TOOL CODE FET RPM RPX GR RPD RPS FCNT NCNT NPHI PEF DRHO RHOB ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE Comment Record FILE HEADER FILE N-UMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. 6 .5000 START DEPTH 14870.5 14870.5 14870.5 14899.5 14907.0 14907.0 14908.5 14908.5 14908.5 14919.5 14919.5 14919.5 14973.0 SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM kNGLE: MAXIMUM A/~GLE: TOOL STRING (TOP TO BOTTOM) STOP DEPTH 16136 5 16136 5 16136 5 16165 0 16136 5 16136 5 16144 0 16144 0 16144 0 16154 0 16153 5 16153 5 16207 0 19-JI/N- 98 5.07 5.46 MEMORY 16194.0 14954.0 16194.0 63.1 64.3 VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA P~AY EWR4 ELECTRON_AG. RESIS. 4 CNP COMPENSATED NEUTRON SLD STABILIZED LITHO DEN $ BOREHOLE A/qD CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STA/~-DOFF (IN) : EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NIIMBER P1027CRNLG6 P1027CRNLG6 P1027CRNLG6 P1027CRNLG6 9.880 9.9 KCL CHEM 10.50 43.0 8.0 18500 2.6 .740 .362 .550 1.110 65.6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPX MWD 6 OHMM 4 1 68 4 2 RPS MWD 6 OHMM 4 1 68 8 3 RPM MWD 6 OHMM 4 1 68 12 4 RPD MWD 6 OHMM 4 1 68 16 5 ROP MWD 6 FT/H 4 1 68 20 6 FET MWD 6 HOUR 4 1 68 24 7 NPHI MWD 6 PU-S 4 1 68 28 8 RHOB MWD 6 G/C3 4 1 68 32 9 DRHO MWD 6 SNP2 MWD 6 FCNT MWD 6 NCNT MWD 6 GR MWD 6 G/C3 4 1 68 BARN 4 1 68 CNTS 4 1 68 CNTS 4 1 68 API 4 1 68 36 40 44 48 52 10 11 12 13 14 Name DEPT RPX RPS RPM RPD ROP FET NPHI RHOB DRHO SNP2 FCNT NCNT GR Min 14870.5 1 0819 1 7505 1 9321 1 9538 7 8447 0 6509 23 7808 1 3471 -0.523 2.8524 471.984 2261.62 38.5966 Max Mean Nsam 16207 15538.8 2674 12.5114 2.81083 2533 33.4944 4.06737 2460 48.8676 4.62497 2533 40.592 4.74646 2460 1884.38 92.2747 2469 123.934 6.0995 2533 92.5489 44.5796 2472 3.1324 2.52117 2469 0.6556 0.0592722 2469 17.1536 5.62295 2470 877.224 567.172 2472 3040 2593.5 2472 335.129 100.105 2532 First Reading 14870.5 14870.5 14907 14870.5 14907 14973 14870.5 14908 5 14919 5 14919 5 14919 5 14908 5 14908 5 14899 5 Last Reading 16207 16136.5 16136.5 16136.5 16136.5 16207 16136.5 16144 16153.5 16153.5 16154 16144 16144 16165 First Reading For Entire File .......... 14870.5 Last Reading For Entire File ........... 16207 File Trailer Service name ............. STSLIB.003 Service Sub Level Name.., Version Number ........... 1.0.0 Date of Generation ....... 98/10/06 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/10/06 Origin ................... STS Tape Name ................ UNK~OWN Continuation Number ...... 01 Next Tape Name ........... UNE/qOWN Comments ................. STS LIS Writing Library. Services Reel Trailer Service name ............. LISTPE Date ..................... 98/10/06 Origin ................... STS Scientific Technical Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File