Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout216-1347. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU C-31C Mill CIBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 216-134 50-029-21775-03-00 13612 Conductor Surface Intermediate Production Liner 9027 80 2792 9973 1465 2306 13554 20" x 30" 13-3/8" 9-5/8" 7" 2-3/8" 9029 37 - 117 36 - 2828 33 - 10006 9860 - 11325 11296 - 13602 37 - 117 36 - 2722 33 - 7597 7481 - 8746 8721 - 9027 13542 2260 4760 7020 11780 None 5020 6870 8160 11200 11856 - 13550 3-1/2" 9.3# L-80 31 - 11325 9023 - 9029 Structural 4-1/2" Baker SABL-3 Packer 11274 8702 Torin Roschinger Operations Manager Michael Hibbert michael. hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, Prudhoe Oil Pool Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028305 31 - 8746 N/A N/A 212 651 18891 19780 30 30 350 1500 800 740 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed 11274, 8702 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 11:31 am, Nov 21, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.11.21 05:00:19 - 09'00' Torin Roschinger (4662) DSR-11/21/24WCB 2-7-2025 RBDMS JSB 112724 ACTIVITY DATE SUMMARY 11/11/2024 (TFS unit 1 assist S-Line with load and test) Arrived on location and Started RU **********WSR Continued on 11-12-2024******* 11/11/2024 ***WELL FLOWING UPON ARRIVAL*** (Mill / underream) RAN 2 3/8" BLB, 1.75" GAUGE RING TO BRUSH R NIPPLE @ 11,298' MD ***CONTINUED ON 11/12/24 WSR*** 11/12/2024 ******WSR Continued from 11-11-2024********* T/I/O 2450/350/0 (TFS unit 1 assist S- Line with load and test MIT-T) Pumped 130 bbls of Crude down the TBG for load. Pumped a further 5 bbls of Crude down the TBG to complete test. MIT-T *******PASSED @ 1750 psi with a target of 1500 psi. 1st 15 min TBG lost 100 psi, 2nd 15 min TBG lost 25 psi for a total loss of 125 psi in a 30 min test. Bled TBG down to 600 psi bleeding back 3 bbls. Well left in S-Line control. Final WHPS 600/320/0 11/12/2024 ***CONTINUED FROM 11/11/24*** (Mill / underream) SET 1.781" RR PLUG @ 11,298' MD T-BIRD CONDUCTED PASSING MIT-T EQ'S & PULLED PLUG @ 11,298' MD ***WELL LEFT S/I ON DEPARTURE, PAD-OP NOTIFIED OF STATUS*** 11/15/2024 CTU #1 1.5" Duracoil .134 wall Job Scope: Mill CIBP Weekly BOP test 300/4000 psi - no failures. Flange up BOP on well - function test. PT Lub 300/4200 psi. WHP 2520 psi. Load tbg w/ 3 bbls MW, 72 bbls 1% KCl, and 30 bbls diesel (3450') 3.6 bpm @ 450 psi. RIH w/ YJ 1.69" CTC, checks, Jar, disc., Tempress, motor, and 1.75" Venturi burn shoe OAL 25.7'. Tag CIBP @ 12286' CTM 12290' MD. Burn over plug and chase to bttm @ 13538' + 4' correction = 13542' MD (8' perfs covered) POH. At surface close Swab and SSV open swab freeze protect flowline. Close swab popoff breakdown tools. Stack down RDMO ***Job Complete*** Daily Report of Well Operations PBU C-31C Tag CIBP @ 12286' CTMg@ 12290' MD. Burn over plug and chase to bttm @ 13538' + 4' correction = 13542' MD 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU C-31C Mill CIBP, Extended Add Perf w CT Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 216-134 50-029-21775-03-00 13612 Conductor Surface Intermediate Production Liner 9027 80 2792 9973 1465 2306 12300 20" x 30" 13-3/8" 9-5/8" 7" 2-3/8" 9018 37 - 117 36 - 2828 33 - 10006 9860 - 11325 11296 - 13602 37 - 117 36 - 2722 33 - 7597 7481 - 8746 8721 - 9027 13538 2260 4760 7020 11780 12300 5020 6870 8160 11200 11856 - 13550 3-1/2" 9.3# L-80 31 - 11325 9023 - 9029 Structural 4-1/2" Baker SABL-3 Packer 11274, 8702 11274 8702 Stan Golis Sr. Area Operations Manager Ron Phillips - (C) Ron.Phillips@hilcorp.com 907.317.5092 PRUDHOE BAY, Prudhoe Oil Pool Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028305 31 - 8746 N/A N/A 186 512 16891 10878 14 240 800 1530 717 334 322-643 13b. Pools active after work:Prudhoe Oil No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Samantha Carlisle at 9:08 am, Jan 24, 2023 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2023.01.24 08:39:55 -09'00' Stan Golis (880) Sundry Number PBU C-31C Mill CIBP, Extended Add Perf w CTil d biCoiled Tubing Ops 322-643 Perforate PRUDHOE BAY, Prudhoe Oil Pool WCB 11-7-2023 RBDMS JSB 013123 Plug Perforations DSR-1/256/23 216-134 ACTIVITY DATE SUMMARY 1/16/2023 LRS CTU #2 1.5" Blue Coil. Job Objective: Mill CIBP, Set CIBP, Extended Perforate MIRU & pump 1-1/16" dirft ball. MU YJ 1-1/16" milling BHA w/ 1.76" 3-blade junk mill. ***Job in Progress*** 1/17/2023 LRS CTU #2 1.5" Blue Coil. Job Objective: Mill CIBP, Set CIBP, Extended Perforate Load the well with 90 BBl's of 1% KCL & 20 BBL DSL freeze protect. RIH w/ 1-11/16" YJ milling BHA w/ 1.76" 3-blade junk mill. Tag 2-3/8" CIBP at 13,013' CTM / 13,010' MD. Attempted to mill and could not create motorwork nor a stall. POOH to check tools. Mill had a wear spot in the center of the face, spining on shear stud. Lay down mill and pick up a 1.71" burshoe. Mill plug at 13013CTM and push to 13538CTMD. POOH and get hung up at the liner top packer. POOH and lay down burnshoe, Make up 1.76" diamond parabolic mill. RIH and bullhead to clear liner top packer. Dry drift through LTP 3X and then continue in hole for dry drift down to 12404CTMD. POOH and freeze protect the well with 5bbl of 60/40 and 10bbl of diesel. ***Job Continued on 1/18/2023*** 1/18/2023 LRS CTU #2 1.5" Blue Coil. Job Objective: Mill CIBP, Set CIBP, Extended Perforate Continue POOH with 1.76" parabolic mill. Perform weekly BOP test. MU HES GR/CCL & RIH to 12,400'. Log up to 11,000' at 50 FPM. Paint "yellow" flag at 12,244.17' E / 12,250' M / 12,242.61' HES. POOH and confirm good data (+6'). MU NS 2-3/8" CIBP. RIH and set at 12,300'. Good indication of set, tag plug, and PU to ~11,200'. Confirm good no-flow and PT CIBP to 1000 psi. POOH maintaing hole fill. Deploy 289' (245' loaded) of 1.56" Geo Razor perf guns, 6 spf, and RIH. ...Continued on WSR 1-19-23... 1/19/2023 LRS CTU #2 - 1.50" Blue Coil ***Cont. from WSR 1-18-23*** Job Objective: Mill CIBP, Set CIBP, Ext. AddPerf. RIH with 289' (245' loaded) of 1.56" Geo Razor perf guns, 6 spf and tie-in to top of CIBP. Perforate 11856'-12008' and 12052'-12145'. POOH maintaing hole fill. Lay down perf gun BHA and FP the well to 2500' TVD. RDMO CTU. ***Job Complete*** Daily Report of Well Operations PBU C-31C y Mill plug at 13013CTM and push to 13538CTMD y RIH and bullhead to clear liner top packer. RDMO CTU. The new CIBP and the new adperfs are shown at the correct depth on the new WBS, below. -WCB Milled CIBP fish is shown at the correct depth on the new WBS, below. -WCB j RIH with 289' (245' loaded) of 1.56" Geo Razor perf guns, 6 spf and tie-in to top of() CIBP. Perforate 11856'-12008' and 12052'-12145'. Tag 2-3/8" CIBP at 13,013' CTM / 13,010'gjg MD. Attempted to mill and could not create motorwork nor a stall. POOH to check tools. Mill had a wear spot in the center of the face, spining on shear studg MU HES y GR/CCL & RIH to 12,400'. Log up to 11,000' at 50 FPM. Paint "yellow" flag atgyg 12,244.17' E / 12,250' M / 12,242.61' HES. POOH and confirm good data (+6'). MU NS 2-3/8" CIBP. RIH and set at 12,300'. Good indication of set, tag plug, and PU to g() ~11,200'. Confirm good no-flow and PT CIBP to 1000 psi Dry drift through LTP 3X and then continue in hole for dry drift down to 12404CTMD LRS CTU #2 1.5" Blue Coil. Job Objective: Mill CIBP, Set CIBP, Extended Perforate Deploy 289' (245' loaded) of 1.56" Geo Razor perf guns, 6 spf, and RIH. g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y Anne Prysunka at 8:16 am, Nov 09, 2022  ; 0*5129'65'/%   *&:  Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2022.11.14 13:54:49 -09'00' RBDMS JSB 111622 Dŝůů͕ WůƵŐ ĂŶĚ ĚĚ WĞƌĨ Ͳϯϭ Wd͗ϮϭϲͲϭϯϰ tĞůůEĂŵĞ͗Ͳϯϭ dh Dŝůů WůƵŐ͕^Ğƚ WůƵŐΘ ĚĚWĞƌĨ W/EƵŵďĞƌ͗ϱϬͲϬϮϵͲϮϭϳϳϱͲϬϯ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗WƌŽĚƵĐŝŶŐ ZŝŐ͗ůŝŶĞ͕ dhΘ^ƵƌĨĂĐĞ ĞƉůŽLJĞĚdW'ƵŶƐ ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗ϭϮͬϭϱͬϮϬϮϮ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϯĚĂLJƐ ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛ƐƚĚ͍ĂƚĞZĞŐ͘ƉƉƌŽǀĂůZĞĐ͛ǀĚ͗ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗ďďŝĞĂƌŬĞƌ WĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗ϮϭϲϭϯϰϬ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗ůĂŝƌĞDĂLJĨŝĞůĚ ;ϵϬϳͿ ϱϲϰͲϰϯϳϱ ;KͿ ;ϳϭϯͿϰϰϯͲϯϲϯϭ ;DͿ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗tLJĂƚƚZŝǀĂƌĚ ;ϵϬϳͿϳϳϳͲϴϱϰϳ;KͿ ;ϱϬϵͿϲϳϬͲϴϬϬϭ;DͿ ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ͗ϯϯϭϬƉƐŝΛϴ͕ϴϬϬ͛dsϳ͘ϯWW'ͮ ;ǀĞƌĂŐĞ/ǀŝƐŚĂŬ,WͿ DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϯϯϭϬƉƐŝΛϴ͕ϴϬϬ͛dsϳ͘ϯWW'ͮ ;ǀĞƌĂŐĞ/ǀŝƐŚĂŬ,WͿ DĂdž͘ŶƚŝĐŝƉĂƚĞĚ^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϮϰϯϬƉƐŝ ;ĂƐĞĚŽŶ Ϭ͘ϭƉƐŝͬĨƚ͘ŐĂƐŐƌĂĚŝĞŶƚͿ >ĂƐƚ ^/ t,W͗ϮϮϱϬ ƉƐŝ ;dĂŬĞŶ ŽŶ ϯͬϮϭͬϮϬϭϵͿ DŝŶ/͗ϭ͘ϳϴ͟ / >dW Ăƚ ϭϭϮϵϴ͛ D DĂdžŶŐůĞ͗ϵϰ ĞŐΛ ϭϯϭϵϬ͛ ƌŝĞĨtĞůů^ƵŵŵĂƌLJ͗ ϮϬϭϲ ƐŝĚĞƚƌĂĐŬŝŶƚŽϭ ĂŶĚϭ͕ Ͳϯϭ ǁĂƐĐŽŵƉůĞƚĞĚǁŝƚŚ ϰϮϱΖŽĨ ƚŽĞ ƉĞƌĨƐĂŶĚĨůŽǁĞĚĨƵůůƚŝŵĞƵŶƚŝů ŵŝĚ ϮϬϭϴ ǁŚĞŶƚŚĞǁĞůůďĞŐĂŶƚŽƌĞĂĐŚŵĂƌŐŝŶĂů'KZ͘dŚĞǁĞůů ǁĂƐ ĐLJĐůĞĚŽŶĐĞďĞĨŽƌĞĚĞǀĞůŽƉŝŶŐĂƚƵďŝŶŐůĞĂŬ ĂŶĚďĞŝŶŐ^/ŝŶĞĂƌůLJϮϬϭϵ͘ /ŶϮϬϮϭ͕ƚŚĞƚƵďŝŶŐǁĂƐƉĂƚĐŚĞĚĂŶĚŶĞdžƚƐƚĂŐĞŽĨƉĞƌĨƐǁĞƌĞƐŚŽƚ͘dŚĞǁĞůůŚĂƐ ƌĞƚƵƌŶĞĚƚŽŵĂƌŐŝŶĂůĂŶĚ ƌĞĂĚLJĨŽƌŶĞdžƚƐƚĂŐĞŽĨƉĞƌĨƐ͘ dŚĞŐŽĂůŽĨƚŚŝƐƉƌŽŐƌĂŵ ŝƐƚŽŵŽǀĞƚŽ ƚŚĞ ŶĞdžƚƐƚĂŐĞŽĨ ƉĞƌĨŽƌĂƚŝŽŶƐƚŽƌĞƚƵƌŶǁĞůůƚŽĞĐŽŶŽŵŝĐ'KZ͘ WƌŝŽƌƚŽƉůƵŐŐŝŶŐĂŶĚĞdžƚĞŶĚĞĚĂĚĚƉĞƌĨƐŽŶͲϯϭ͕ ƚŚĞĞdžŝƐƚŝŶŐ/WǁŝůůďĞŵŝůůĞĚĂŶĚƉƵƐŚĞĚƚŽďŽƚƚŽŵƚŽ ĂƐƐŝƐƚŝŶĨƵƚƵƌĞĨƵůůǁĞůůĐLJĐůŝŶŐƐƚƌĂƚĞŐLJ͘ KďũĞĐƚŝǀĞ͗hƚŝůŝnjĞdh ƚŽ ŵŝůůƚŚĞĞdžŝƐƚŝŶŐƉůƵŐ͕ƐĞƚĂŶĞǁƉůƵŐƚŽ ŝƐŽůĂƚĞĞdžŝƐƚŝŶŐƉĞƌĨŽƌĂƚŝŽŶƐƚŚĞŶ ĂĚĚŶĞǁ ƉĞƌĨƐ ĂŶĚ ŝŵƉƌŽǀĞĨůƵŝĚƌĂƚĞƐ͘ WƌŽĐĞĚƵƌĞ͗ ^ůŝĐŬůŝŶĞ ;dŚŝƐƐƚĞƉŝƐĂƚƚŚĞt^>͛Ɛ ĚŝƐĐƌĞƚŝŽŶ͘Ϳ ϭ͘ D/Zh^ůŝĐŬůŝŶĞhŶŝƚĂŶĚƐƉŽƚĂŶĐŝůůĂƌLJĞƋƵŝƉŵĞŶƚ͘ Ϯ͘ Z/,tŝƚŚƵŵŵLJŐƵŶĚƌŝĨƚĂŶĚƐĂŵƉůĞďĂŝůĞƌƚŽĚĞǀŝĂƚŝŽŶĂŶĚĐ ŽůůĞĐƚƐĂŵƉůĞŝĨƉŽƐƐŝďůĞ͘/ĨƐĂŵƉůĞŝƐ ĐŽůůĞĐƚĞĚ͕ ƉůĞĂƐĞŶŽƚĞŝŶt'Z^ĂŶĚŶŽƚŝĨLJK͘ tĞůů^ƵƉƉŽƌƚ͗ZŝŐƵƉW'>ĞƋƵŝƉŵĞŶƚƉƌŝŽƌƚŽũŽďƐŽǁĞůůĐĂŶďĞƉŽƉƉĞĚĂĨƚĞƌŬŝůůĞĚĂŶĚƉĞƌĨ͛Ě͘ ^ƵŶĚƌLJ WƌŽĐĞĚƵƌĞ ;ƉƉƌŽǀĂůZĞƋƵŝƌĞĚƚŽWƌŽĐĞĞĚͿ͗ ŽŝůdƵďŝŶŐ EŽƚĞƐ͗ x ƵĞƚŽƚŚĞŶĞĐĞƐƐĂƌLJŽƉĞŶŚŽůĞĚĞƉůŽLJŵĞŶƚŽĨdžƚĞŶĚĞĚWĞƌĨŽƌĂƚŝŶŐũŽďƐ͕ϮϰͲŚŽƵƌĐƌĞǁĂŶĚt^^ ĐŽǀĞƌĂŐĞŝƐƌĞƋƵŝƌĞĚ͘ x dŚĞǁĞůůǁŝůůďĞŬŝůůĞĚĂŶĚŵŽŶŝƚŽƌĞĚďĞĨŽƌĞŵĂŬŝŶŐƵƉƚŚĞŝŶŝƚŝĂůƉĞƌĨƐŐƵŶƐ͘dŚŝƐŝƐŐĞŶĞƌĂůůLJĚŽŶĞ ĚƵƌŝŶŐƚŚĞĚƌŝĨƚͬůŽŐŐŝŶŐƌƵŶ͘ dŚŝƐǁŝůůƉƌŽǀŝĚĞŐƵŝĚĂŶĐĞĂƐƚŽǁ ŚĞƚŚĞƌƚŚĞǁĞůůǁŝůůďĞŬŝůůĞĚďLJ ďƵůůŚĞĂĚŝŶŐŽƌĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵŐŚŽƵƚƚŚĞũŽď͘ /ĨƉƌĞƐƐƵƌĞŝƐƐĞĞŶŝŵŵĞĚŝĂƚĞůLJĂĨƚĞƌ ƉĞƌĨŽƌĂƚŝŶŐ͕ŝƚǁŝůůĞŝƚŚĞƌďĞŬŝůůĞĚďLJďƵůůŚĞĂĚŝŶŐǁŚŝůĞWKK,ŽƌĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵŐŚƚŚĞ ƐĂŵĞƉŽƌƚƚŚĂƚŽƉĞŶĞĚƚŽƐŚĞĂƌƚŚĞĨŝƌŝŶŐŚĞĂĚ͘ ϮϰϯϬƉƐŝ  '/% Dŝůů͕ WůƵŐ ĂŶĚ ĚĚ WĞƌĨ Ͳϯϭ Wd͗ϮϭϲͲϭϯϰ ϭ͘ D/ZhŽŝůĞĚdƵďŝŶŐhŶŝƚ ǁͬ ϭ͘ϱ͞ ĐŽŝů͕ƉƌĞƐƐƵƌĞƚĞƐƚ ĂŶĚƐƉŽƚĂŶĐŝůůĂƌLJĞƋƵŝƉŵĞŶƚ͘ Ϯ͘ Z/,ǁŝƚŚŵŽƚŽƌĂŶĚŵŝůůƚŽŵŝůůŽƵƚ ϮͲϯͬϴ͟ /WĂƚ ϭϯ͕ϬϭϬ͛D͘ƚƚĞŵƉƚƚŽƉƵƐŚ/WƚŽďŽƚƚŽŵ͘ ϯ͘ Dh 'Zͬ>ĂŶĚĚƌŝĨƚ ĨŽƌϮͲϯͬϴ͟ /W͕ Z/, ƚŽΕϭϮ͕ϱϬϬ͛D ϰ͘ >ŽŐ ƵƉ͕ƐƚŽƉƉŝŶŐƚŽƉĂŝŶƚĨůĂŐ͘ ϱ͘ WKK,ĂŶĚĐŽŶĨŝƌŵ ŐŽŽĚĚĂƚĂ͕ŽďƚĂŝŶ ĐŽƌƌĞĐƚŝŽŶ͘ Ă͘ ŽƌƌĞůĂƚĞƚŽ ZĞĂĚŽŝů&ůĂŐĚĂƚĞĚϭϱͲ:ƵůͲϮϬϮϭ ϲ͘ ƵůůŚĞĂĚΕϭϱϬ ďďůƐ;ϭ͘ϱdžǁĞůůďŽƌĞǀŽůƵŵĞͿ ŽĨ<t&͕ϴ͘ϰƉƉŐϭй<ůŽƌƐĞĂǁĂƚĞƌ ĚŽǁŶƚŚĞƚƵďŝŶŐƚŽƚŚĞ ĨŽƌŵĂƚŝŽŶ͘ Ă͘ tĞůůďŽƌĞǀŽůƵŵĞƚŽďŽƚƚŽŵƉĞƌĨс ϭϬϮ ďďůƐ ď͘ ϯͲϭͬϮ͟dƵďŝŶŐ ʹ ϭϭϮϴϬ͛y͘ϬϬϳϴďƉĨс ϵϴ ďďůƐ Đ͘ ϮͲϯͬϴ͟>ŝŶĞƌ ʹ ϭϬϳϱ͛;ƚŽďŽƚƚŽŵƉĞƌĨͿy͘ϬϬϯϵ ďƉĨс ϰ ďďůƐ ϳ͘ ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚ͘&ƌĞĞnjĞƉƌŽƚĞĐƚƚƵďŝŶŐĂƐŶĞĞĚĞĚ͘ ϴ͘ Dh ϮͲϯͬϴ͟ Z/W ĂŶĚZ/,ĂŶĚĐŽƌƌĞĐƚƚŽĨůĂŐ͘ ϵ͘ ŽŶƚĂĐƚK ůĂŝƌĞDĂLJĨŝĞůĚϳϭϯͲϰϰϯͲϯϲϯϭŽƌ tLJĂƚƚZŝǀĂƌĚϭ;ϱϬϵͿϲϳϬͲϴϬϬ ƉƌŝŽƌƚŽ ƐĞƚƚŝŶŐ ƉůƵŐͬƉĞƌĨŽƌĂƚŝŶŐĨŽƌĨŝŶĂůĂƉƉƌŽǀĂůŽĨƚŝĞͲŝŶƐ ϭϬ͘ ^ĞƚƉůƵŐŵŝĚͲũŽŝŶƚ ĂƚцϭϮ͕ϮϬϬ͛D ĂŶĚƚĞƐƚƚŽϭϱϬϬƉƐŝ͘WKK,͘ ϭϭ͘ ƚƐƵƌĨĂĐĞ͕ƉƌĞƉĂƌĞĨŽƌĚĞƉůŽLJŵĞŶƚŽĨdWŐƵŶƐ͘ ƐƐƵƌĞĞdžĐĞƐƐĨůƵŝĚƐĂǀĂŝůĂďůĞŝĨŶĞĞĚĞĚƚŽŬĞĞƉŚŽůĞ ĨƵůů͘ ϭϮ͘ ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚ͘ůĞĞĚĂŶLJ ƉƌĞƐƐƵƌĞŽĨĨƚŽƌĞƚƵƌŶƚĂŶŬ͘<ŝůůǁĞůůǁͬ<t&͕ϴ͘ϰƉƉŐϭй<ůŽƌ ƐĞĂǁĂƚĞƌ ĂƐŶĞĞĚĞĚ͘DĂŝŶƚĂŝŶĐŽŶƚŝŶƵŽƵƐŚŽůĞĨŝůůƚĂŬŝŶŐƌĞƚƵƌŶƐƚŽƚĂŶŬƵŶƚŝůůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶŝƐ ƌĞĞƐƚĂďůŝƐŚĞĚ͘&ůƵŝĚƐŵĂŶͲǁĂƚĐŚŵƵƐƚďĞƉĞƌĨŽƌŵĞĚǁŚŝůĞĚĞƉůŽLJŝ ŶŐƉĞƌĨŐƵŶƐƚŽĞŶƐƵƌĞ ƚŚĞǁĞůů ƌĞŵĂŝŶƐŬŝůůĞĚĂŶĚƚŚĞƌĞŝƐŶŽĞdžĐĞƐƐĨůŽǁ͘ ϭϯ͘ ΎWĞƌĨŽƌŵĚƌŝůůďLJƉŝĐŬŝŶŐƵƉƐĂĨĞƚLJũŽŝŶƚǁŝƚŚd/tǀĂůǀĞĂŶĚƐƉĂĐĞŽƵƚďĞĨŽƌĞDhŐƵŶƐ͘ZĞǀŝĞǁ ǁĞůů ĐŽŶƚƌŽůƐƚĞƉƐǁŝƚŚĐƌĞǁƉƌŝŽƌƚŽďƌĞĂŬŝŶŐůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂŶĚĐŽŵŵĞŶĐŝŶŐŵĂŬĞƵƉŽĨdWŐƵŶ ƐƚƌŝŶŐ͘KŶĐĞƚŚĞƐĂĨĞƚLJũŽŝŶƚĂŶĚd/tǀĂůǀĞŚĂǀĞďĞĞŶƐƉĂĐĞĚŽƵƚ͕ŬĞĞƉƚŚĞƐĂĨĞƚLJũŽŝŶƚͬd/tǀĂůǀĞ ƌĞĂĚŝůLJĂĐĐĞƐƐŝďůĞŶĞĂƌƚŚĞǁŽƌŬŝŶŐƉůĂƚĨŽƌŵĨŽƌƋƵŝĐŬ ĚĞƉůŽLJŵĞŶƚŝĨŶĞĐĞƐƐĂƌLJ͘ Ă͘ ƚƚŚĞďĞŐŝŶŶŝŶŐŽĨĞĂĐŚũŽď͕ƚŚĞĐƌŽƐƐŽǀĞƌͬƐĂĨĞƚLJũŽŝŶƚŵƵƐƚďĞƉŚLJƐŝĐĂůůLJDhƚŽƚŚĞƉĞƌĨŐƵŶƐ ŽŶĞƚŝŵĞƚŽĐŽŶĨŝƌŵƚŚĞƚŚƌĞĂĚƐĂƌĞĐŽŵƉĂƚŝďůĞ͘ ϭϰ͘ ƌĞĂŬůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂƚYd^ĂŶĚďĞŐŝŶŵĂŬĞƵƉŽĨdWŐ ƵŶƐƉĞƌƐĐŚĞĚƵůĞ ďĞůŽǁ͘ ŽŶƐƚĂŶƚůLJ ŵŽŶŝƚŽƌĨůƵŝĚƌĂƚĞƐƉƵŵƉĞĚŝŶĂŶĚĨůƵŝĚƌĞƚƵƌŶƐŽƵƚŽĨƚŚĞǁĞůů ͘&ůƵŝĚƐŵĂŶͲǁĂƚĐŚŵƵƐƚďĞƉĞƌĨŽƌŵĞĚ ǁŚŝůĞĚĞƉůŽLJŝŶŐƉĞƌĨŐƵŶƐƚŽĞŶƐƵƌĞƚŚĞǁĞůůƌĞŵĂŝŶƐŬŝůůĞĚĂŶĚƚŚĞƌĞŝƐŶŽĞdžĐĞƐƐĨůŽǁ͘ 'ƵŶ ZƵŶη WĞƌĨdŽƉ Ͳ ŽƚƚŽŵ 'ƵŶ >ĞŶŐƚŚ WĞƌĨ >ĞŶŐƚŚ tĞŝŐŚƚ ;ϱƉƉĨͿ ϭ ϭϭϴϱϲͲϭϮϬϬϴ ϭϱϮ ϴϬ ϳϲϬ ϰϰ͛>E<ϰϰ >E<ϮϮϬ ϭϮϬϱϮͲϭϮϭϰϱ ϵϯ ϴϱ ϰϲϱ dŽƚĂů Ϯϴϵ Ϯϰϱ ϭϰϰϱ dĂďůĞ ϭ͗ Ͳϯϭ WƌŽƉŽƐĞĚ ĚͲWĞƌĨ 'ƵŶZƵŶƐ ϭϱ͘ Z/,ǁŝƚŚƉĞƌĨŐƵŶĂŶĚƚŝĞͲŝŶƚŽĐŽŝůĨůĂŐ ĐŽƌƌĞůĂƚŝŽŶĂŶĚͬŽƌ/W͘WŝĐŬƵƉĂŶĚƉĞƌĨŽƌĂƚĞŝŶƚĞƌǀĂů ƉĞƌWĞƌĨ ^ĐŚĞĚƵůĞĂďŽǀĞ͘ Ă͘ EŽƚĞĂŶLJƚƵďŝŶŐƉƌĞƐƐƵƌĞĐŚĂŶŐĞŝŶt^Z͘ ϭϲ͘ ĨƚĞƌƉĞƌĨŽƌĂƚŝŶŐ͕Wh,ƚŽƚŽƉŽĨůŝŶĞƌŽƌŝŶƚŽƚƵďŝŶŐƚĂŝůƚŽĞŶƐƵƌĞĚĞďƌŝƐĚŽĞƐŶ͛ƚĨĂůůŝŶŽŶƚŚĞŐƵŶƐĂŶĚ ƐƚŝĐŬƚŚĞ,͘ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚĂŶĚƌĞͲŬŝůůŝĨŶĞĐĞƐƐĂƌLJďĞĨŽƌĞƉƵůůŝŶŐƚŽƐƵƌĨĂĐĞ͘ ϭϳ͘ WƵŵƉƉŝƉĞĚŝƐƉůĂĐĞŵĞŶƚǁŚŝůĞ WKK,͘ ^ƚŽƉĂƚƐƵƌĨĂĐĞƚŽƌĞĐŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚ͘<ŝůůǁĞůůŝĨŶĞĐĞƐƐĂƌLJ͘ 0DNHXS3&(PJU Dŝůů͕ WůƵŐ ĂŶĚ ĚĚ WĞƌĨ Ͳϯϭ Wd͗ϮϭϲͲϭϯϰ ϭϴ͘ ZĞǀŝĞǁǁĞůůĐŽŶƚƌŽůƐƚĞƉƐǁŝƚŚĐƌĞǁƉƌŝŽƌƚŽďƌĞĂŬŝŶŐůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂŶĚĐŽŵŵĞŶĐŝŶŐďƌĞĂŬĚŽǁŶ ŽĨdWŐƵŶƐƚƌŝŶŐ͘ ϭϵ͘ ŶƐƵƌĞƐĂĨĞƚLJũŽŝŶƚĂŶĚd/tǀĂůǀĞĂƐƐĞŵďůLJĂƌĞŽŶͲŚĂŶĚďĞĨŽƌĞďƌĞĂŬŝŶŐŽĨĨůƵďƌŝĐĂƚŽƌƚŽ>ŐƵŶ,͘ ϮϬ͘ ZDKdh͘ Ϯϭ͘ ZdWŽƌ&WǁĞůů͘ ƚƚĂĐŚŵĞŶƚƐ͗ ϭ͘ ƐͲďƵŝůƚ^ĐŚĞŵĂƚŝĐ Ϯ͘ WƌŽƉŽƐĞĚ^ĐŚĞŵĂƚŝĐ ϯ͘ ŽŝůdƵďŝŶŐKW^ĐŚĞŵĂƚŝĐ ϰ͘ ^ƚĂŶĚŝŶŐ KƌĚĞƌƐĨŽƌKƉĞŶ,ŽůĞtĞůůŽŶƚƌŽůĚƵƌŝŶŐWĞƌĨ'ƵŶĞƉůŽLJŵĞŶƚ ϱ͘ ƋƵŝƉŵĞŶƚ>ĂLJŽƵƚŝĂŐƌĂŵ ϲ͘ dŝĞ/Ŷ>ŽŐͬWĞƌĨ^ŚĞĞƚ ϳ͘ ^ƵŶĚƌLJŚĂŶŐĞ&Žƌŵ Dŝůů͕ WůƵŐ ĂŶĚ ĚĚ WĞƌĨ Ͳϯϭ Wd͗ϮϭϲͲϭϯϰ tĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ Dŝůů͕ WůƵŐ ĂŶĚ ĚĚ WĞƌĨ Ͳϯϭ Wd͗ϮϭϲͲϭϯϰ WƌŽƉŽƐĞĚ ^ĐŚĞŵĂƚŝĐ Dŝůů͕ WůƵŐ ĂŶĚ ĚĚ WĞƌĨ Ͳϯϭ Wd͗ϮϭϲͲϭϯϰ ŽŝůĞĚdƵďŝŶŐKWƐ Dŝůů͕ WůƵŐ ĂŶĚ ĚĚ WĞƌĨ Ͳϯϭ Wd͗ϮϭϲͲϭϯϰ ^ƚĂŶĚŝŶŐKƌĚĞƌƐĨŽƌKƉĞŶ ,ŽůĞtĞůůŽŶƚƌŽůĚƵƌŝŶŐWĞƌĨ'ƵŶĞƉůŽLJŵĞŶƚ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ŝůů͕ WůƵŐ ĂŶĚ ĚĚ WĞƌĨ Ͳϯϭ Wd͗ϮϭϲͲϭϯϰ Dŝůů͕ WůƵŐ ĂŶĚ ĚĚ WĞƌĨ Ͳϯϭ Wd͗ϮϭϲͲϭϯϰ ͲϯϭWůƵŐĂŶĚWĞƌĨŽƌĂƚŝŶŐ dŝĞͲ/Ŷ>ŽŐ Dŝůů͕ WůƵŐ ĂŶĚ ĚĚ WĞƌĨ Ͳϯϭ Wd͗ϮϭϲͲϭϯϰ Dŝůů͕ WůƵŐ ĂŶĚ ĚĚ WĞƌĨ Ͳϯϭ Wd͗ϮϭϲͲϭϯϰ Dŝůů͕ WůƵŐ ĂŶĚ ĚĚ WĞƌĨ Ͳϯϭ Wd͗ϮϭϲͲϭϯϰ +LOFRUS 1RUWK6ORSH//&+LOFRUS 1RUWK6ORSH//&Changes to Approved Work Over Sundry Procedure'DWH 1RYHPEHU  6XEMHFW &KDQJHVWR$SSURYHG 6XQGU\3URFHGXUHIRU :HOO &&6XQGU\ $Q\PRGLILFDWLRQVWR DQ DSSURYHGVXQGU\ ZLOOEHGRFXPHQWHGDQGDSSURYHGEHORZ &KDQJHVWRDQDSSURYHG VXQGU\ ZLOOEHFRPPXQLFDWHGWRWKH$2*&& E\WKH ZRUNRYHU :2 ³ILUVWFDOO´HQJLQHHU $2*&&ZULWWHQDSSURYDORIWKHFKDQJHLVUHTXLUHGEHIRUHLPSOHPHQWLQJWKHFKDQJH6WHS3DJH'DWH 3URFHGXUH&KDQJH+163UHSDUHG%\ ,QLWLDOV +16$SSURYHG%\ ,QLWLDOV $2*&&:ULWWHQ$SSURYDO5HFHLYHG 3HUVRQDQG'DWH $SSURYDO$VVHW7HDP2SHUDWLRQV0DQDJHU 'DWH3UHSDUHG)LUVW&DOO 2SHUDWLRQV (QJLQHHU 'DWH Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:216-134 6.50-029-21775-03-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 13612 13010 9033 11274 None 13010 8702 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" x 30" 37 - 117 37 - 117 Surface 2792 13-3/8" 36 - 2828 36 - 2722 5020 2260 Intermediate 9973 9-5/8" 33 - 10006 33 - 7597 6870 4760 Production 1465 7" 9860 - 11325 7481 - 8746 8160 7020 Perforation Depth: Measured depth: 12355 - 13550 feet True vertical depth:9020 - 9029 feet Tubing (size, grade, measured and true vertical depth)3-1/2" 9.3# L-80 31 - 11325 31 - 8746 11274 8702Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker SABL-3 Packer Liner 2322 2-3/8" 11280 - 13602 8708 - 9027 11200 11780 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 110511502831018991 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Wyatt Rivard wrivard@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.777.8547 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon …Plug Perforations 5 Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9027 Sundry Number or N/A if C.O. Exempt: 320-513 No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Operations shutdown … Change Approved Program 5 N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well5 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028305 PBU C-31C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations Tubing Patch, Extended Perf w CTU 353 4943 160 273600 By Samantha Carlisle at 12:54 pm, Aug 02, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.08.02 12:47:03 -08'00' Stan Golis (880) DSR-8/2/21 RBDMS HEW 8/3/2021MGR02AUG2021 ACTIVITY DATE SUMMARY 4/3/2021 ***WELL S/I ON ARRIVAL*** (HES E-Line Patch) MIRU & PT, LAY DOWN FOR THE NIGHT. ***JOB CONTINUED ON 04-APR-2021** 4/4/2021 ***JOB CONTINUED FROM 03-APR-2021*** (HES E-Line Patch) SET NORTHERN SOLUTIONS 350-272 ONE-TRIP STRADDLE PATCH 8843' - 8873' MD ELEMENT TO ELEMENT. LOG CORRELATED TO SLB LDL DATED 18-AUG-2019. ***JOB COMPLETE ON 04-APR-2021*** ***Northern Solutions 350-272 One-Trip Straddle Patch: Top of patch ~ 8840' MD, minimum I.D. = 1.81" @ 8843' md, OAL LIH ~ 38.51'*** 4/5/2021 T/I/O = SSV/1180/10. Temp = SI. Bleed IAP as low as possible (pre MIT). No AL. IA FL @ 4730' (367' above #3, DMY). Bled IAP to OT tank from 1180 psi to 80 psi in 4, IA FL unchanged. Monitor for 30 minutes. During monitor unchanged. Final WHPs = DDV/80/10. SV, WV, SSV = C. MV = O. IA, OA = OTG. 14:20 4/6/2021 T/I/O=336/76/0 LRS unit 46 MIT-IA (PERFORATING) MIT-IA** PASSED** to 2213 psi Max Applied Pressure=2250 psi Target Pressure=2000 psi. Pressured IA to 2250 psi with 319 bbls of crude. MIT-IA lost 27 psi in the 1st 15 minutes and 17 psi in the 2nd 15 minutes for a total loss of 44 psi during a 30 min test.Bled IA to 100 psi rcovering ~6.8 bbls WV/SV/SSV=C MV=O IA/OA=OTG FWHP's=345/100/30 7/11/2021 ***WELL FLOWING ON ARRIVAL*** RIG UP HES 759 ***CONT WSR ON 7/12/2021*** 7/12/2021 ***CONT WSR FROM 7/11/2021*** SET WCS @ 8840' PULL STA. # 3 RK-DGLV @ 5091' MD SET STA. # 3 RK-OGLV @ 5091' MD (20/64" ports, gen2mod) PULL WCS @ 8840' MD ***WELL LEFT SI*** 7/14/2021 CTU6 1.5" CT Job Objective: Drift, Log, Plug, Ext Adperf SLB CTU6 annual mast load cell calibration in yard. CTU6 travel from yard to C-pad, unit blew a tire enroute to C-pad. Standby for SLB mechanic to inspect unit and Bryce to change out internal dually. CTU6 arrived on location at midnight. ***Job in Progress*** 7/15/2021 CTU6 1.5" CT Job Objective: Drift, Log, Plug, Ext Adperf MIRU CTU6. Make up NS MHA & drift BHA = 1.75" nozzle and RIH. Performed a weight check at the LTP and had higher than expected PU weights, tried to pump down CTBS for L&K but well did not take fluid, Attempted to circulate in fluid, but well did not respond as expected. After trouble shooting it was determined that we most likley hydrated off while RIH with KCL in the coil. Swapped coil over to 50/50 then started pumping 50/50 down CTBS to clear hydrate plug. L&K well with safelube then drift to 13,150' with nozzle BHA. Pooh w/BHA. MU & RIH w/Read logging BHA, logged 13,100' - 11,200', painted flag @ 13,000' ctm. Pooh w/BHA. ***Job in Progress*** Daily Report of Well Operations PBU C-31C Daily Report of Well Operations PBU C-31C 7/16/2021 CTU6 1.5" CT Job Objective: Drift, Log, Plug, Ext Adperf On surface w/Read Logging BHA, good data +14' correction confirmed by OE (Wyatt). MU & RIH w/1.71" NS CIBP BHA. At flag, Corrected EOP = 13,002.75' MD + 7.32' (EOP to Top of plug) = 13,010.07' MD. Correct counter and set top of CIBP at 13,010' MD. Pooh w/BHA. PT CIBP to 1,500psi, flow check well and deploy 500' (430' loaded) of 1.56" Geo Razor guns. RIH and tag CIBP, correct depth to bottom shot, PUH and perforate interval 12,355-12,715 and 12,785-12,855 with 1.56" Geo Razor gun 6spf 60 degree phasing. Pooh w/Gun Run # 1. Lay down 500' of HES 1.56" guns. RDMO CTU6. ***Job Completed*** Operator Name:2. Exploratory Development Service… …5 … Permit to Drill Number:216-134 6.API Number:50-029-21775-03-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 028305 Property Designation (Lease Number):10. 341 8. PBU C-31C 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon …Plug Perforations 5 Fracture Stimulate …Repair Well … Operations shutdown Patch Tubing … Op Shutdown GAS … GSTOR…WAG … SPLUG … … Abandoned Oil 5 WINJ … Exploratory …Development 5Stratigraphic……Service WDSPL … 12. Attachments: PRESENT WELL CONDITION SUMMARY 13612 Effective Depth MD: L-80 11. 12/21/2020 Commission Representative: 15. Suspended … Contact Name: Wyatt Rivard Contact Email: wrivard@hilcorp.com Authorized Name: Stan Golis Authorized Title:Operations Manager Authorized Signature: Plug Integrity …BOP Test …Mechanical Integrity Test …Location Clearance … Other: Yes …No …Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: 5OtherAlter Casing Pull Tubing … Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: No SSSV Installed Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 9027 Effective Depth TVD:Plugs (MD):Junk (MD): …Other Stimulate Re-enter Susp Well Suspend … …Plug for Redrill 5Perforate …Perforate New Pool 11274, 8702 No SSSV Installed Date: Liner 2322 2-3/8" 11280 - 13602 8707 - 9027 11200 11780 Well Status after proposed work: 16. Verbal Approval: 5 … …Change Approved Program 36 - 2828 36 - 2722 14. Estimated Date for Commencing Operations: BOP Sketch 37 - 117 Structural 6870 Proposal Summary 13. Well Class after proposed work: 3-1/2" Baker SABL-3 Packer 13050 - 13550 9035 - 9029 3-1/2" 9.3#31 - 11325 Liner 13554 9029 37 - 117 13-3/8" 9-5/8" Contact Phone:(907)777-8547 Date: 4760 80 20" x 30"Conductor 2260 …GINJ 5 Post Initial Injection MIT Req'd? Yes No 5 5 …… … Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Surface 2792 5020 Intermediate 9973 33 - 10006 33 - 7597 1465 7"9860 - 11325 7481 - 8746 8160 7020 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. …No 5Yes Casing Length MD TVD Burst Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic … 2430 Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. By Samantha Carlisle at 9:32 am, Dec 08, 2020 320-513 Digitally signed by Stan Golis DN: cn=Stan Golis, ou=Users Date: 2020.12.08 06:43:06 - 09'00' Stan Golis DSR-12/9/2020MGR08DEC2020SFD 12/8/2020 Yesn Required? Comm 12/10/2020 dts 12/10/2020 JLC 12/10/2020 10-404 RBDMS HEW 12/14/2020 Patch, Plug and Add Perf C-31C PTD:216-134 Well Name:C-31C TBG Patch and CTU Plug & Add Perf API Number:50-029-21775-03 Current Status:Producing Rig:Eline, CTU & Surface Deployed TCP Guns Estimated Start Date:12/21/2020 Estimated Duration:5days Reg.Approval Req’std?N/A Date Reg. Approval Rec’vd:N/A Regulatory Contact:Abbie Barker Permit to Drill Number:216-134 First Call Engineer:Wyatt Rivard (907) 777-8547 (O)(509) 670-8001 (M) Second Call Engineer:Noel Nocas (907) 777-8449 (O)(907) 947-9533 (M) AFE Number:IOR 378 Current Bottom Hole Pressure:3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP) Maximum Expected BHP:3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP) Max. Anticipated Surface Pressure:2430psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:2250 psi (Taken on 3/21/2019) Min ID:1.78” ID LTP at 11298’ MD Max Angle:94 Deg @ 13190’ Brief Well Summary: A 2016 sidetrack into Z1A and Z1B, C-31C was completed with 425' of toe perfs and flowed full time until mid 2018 when the well began to reach marginal GOR. The well was cycled once before developing a tubing leak and being SI in early 2019. The well was recently POP’d under evaluation but is no longer cycling well and is ready for next stage of perfs. The goal of this program is to move to the next stage of perforations to return well to economic GOR. Prior to plugging and extended add perfs on C-31C, a large ID tubing patch will be installed and tested to restore tubing integrity. Objective:Utilize CTU to isolate existing perforations then surface deploy TCP guns with CTU to add new perfs and improve fluid rates. Notes Regarding Wellbore Condition: x TXIA communication confirmed at .3 BPM at 2400 psi through tubing leak observed at ~8854’ MD x CMIT-TxIA passed to 2609 psi on 4/10/2019 Sundry Procedure (Approval Required to Proceed): Eline 1. MIRU EL unit and pressure test 2. MU CCL, setting tool and one-trip 3-1/2” large ID (1.815”) patch. 3. Set patch over tubing leak at ~8854’. a. Design patch to span from ±8,843’ to ± 8,873’ Mid Element Set Depths b. Correlate to SLB Leak Detect Log dated 8/18/2019 c. Contact OEWyatt Rivard 1(509) 670-8001 or Noel Nocas at 1(907) 947-9533 priorto set for final approval of tie in. 4. Perform MIT-IA to 2000 psi to confirm good set. 5. RDMO (PCE) Patch, Plug and Add Perf C-31C PTD:216-134 Coil Tubing Note: The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging or plug set run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 6. MIRU Coiled Tubing Unit w/ 1.5“ coil, pressure test and spot ancillary equipment. 7. MU GR/CCL and drift for 2-3/8” ER CIBP. 8. RIH below target CIBP set depth of ~ 13,000’ MD 9. Log up, stopping to paint flag. 10. POOH and confirm good data, obtain correction. a. Correlate to BHI GR MPR dated 12-10-2016 11. Bullhead ~100 bbls of 8.4 ppg 1% KCl or 8.5 ppg seawater down the tubing to the formation. b. Wellbore volume = 8900’ X .0087bpf + .0039bpf x 2800’ = 50 bbls 12. Confirm well is dead. Freeze protect tubing as needed. 13. MU 2-3/8” ER CIBP and RIH and correct to flag. 14. Contact OE Wyatt Rivard 1(509) 670-800 or Noel Nocas at 1(907) 947-9533 prior to setting plug/perforating for final approval of tie-ins 15. Set plug mid-joint at ±13,000’ MD and test to 1500 psi. POOH. 16. At surface, prepare for deployment of TCP guns. Assure excess fluids available if needed to keep hole full. 17. Confirm well is dead. Bleed any pressure off to returns tank. Kill well w/8.4 ppg 1% KCl or 8.5 ppg seawater as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 18. Pickup 1.5” safety joint and TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. 19. Break lubricator connection at QTS and begin makeup of TCP guns and blanks per Table 1: C-31C Proposed Ad-Perf Gun Run below. c. A 30 ft gap will be left in the perf interval across a shale as potential future CIBP/isolation Gun Run #Perf Top Perf Bottom Perf Length 1 ±12355 ±12605 ±250 2 ±12605 ±12715 ±110 ±12785’±12855’±70 Total ±430 Table 1: C-31C Proposed Ad-Perf Gun Runs 20. RIH with Gun Run 1 and correlate to flag. Contact OE Wyatt Rivard 1(509) 670-8001 or Noel Nocas at 1(907) 947-9533 prior to perforating for final approval of tie ins. 21. Pickup and perforate intervals per Table 1: C-31C Proposed Ad-Perf Gun Run. POOH. a. Note any tubing pressure change in WSR. 22. POOH. Stop at surface to reconfirm well dead and hole full. Patch, Plug and Add Perf C-31C PTD:216-134 23. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 24. Repeat steps 19 through 23 for Gun Run 2 per Table 1: C-31C Proposed Ad-Perf Gun Run above. 25. RDMO CTU. 26. RTP or FP well. Attachments: 1. As-built Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Tie In Log/Perf Sheet Standing orders flow chart included with this sundry request. Patch, Plug and Add Perf C-31C PTD:216-134 Wellbore Schematic Patch, Plug and Add Perf C-31C PTD:216-134 Proposed Schematic Patch, Plug and Add Perf C-31C PTD:216-134 Coiled Tubing BOPs Patch, Plug and Add Perf C-31C PTD:216-134 Equipment Layout Diagram Patch, Plug and Add Perf C-31C PTD:216-134 Standing Orders for Open Hole Well Control during Perf Gun Deployment Patch, Plug and Add Perf C-31C PTD:216-134 C-31C Patch Tie-In Log Patch, Plug and Add Perf C-31C PTD:216-134 Patch, Plug and Add Perf C-31C PTD:216-134 Patch, Plug and Add Perf C-31C PTD:216-134 C-31C Plug and Perforating Tie-In Log Patch, Plug and Add Perf C-31C PTD:216-134 Patch, Plug and Add Perf C-31C PTD:216-134 Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Rig Work Over Sundry ProcedureDate: December 7, 2020Subject: Changes to Approved Sundry Procedure for Well C-31CSundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the rig workover (RWO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date DATA SUBMITTAL COMPLIANCE REPORT 3/16/2017 Permit to Drill 2161340 Well Name/No. PRUDHOE BAY UNIT C -31C MD 13612 TVD 9027 Completion Date 12/15/2016 REQUIRED INFORMATION Mud Log No f DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name ED C 27844 Digital Data ED C 27844 Digital Data ED C 27844 Digital Data ED C 27844 Digital Data ED C 27844 Digital Data ED C 27844 Digital Data ED C 27844 Digital Data ED C 27844 Digital Data ED C ED C ED C ED C ED C 27844 Digital Data 27844 Digital Data 27844 Digital Data 27844 Digital Data 27844 Digital Data MWD/GR/RES RPM/GR/CCL Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21775-03-00 Completion Status 1-011- Samples -OIL Samples No Current Status 1-0I1- UIC No Directional Survey Yes1z (data taken from Logs Portion of Master Well Data Maint) Log Log Run Interval OH / Scale Media No Start Stop CH Received 10921 13612 12/30/2016 12/30/2016 12/30/2016 12/30/2016 12/30/2016 12/30/2016 12/30/2016 Q 12/30/2016 12/30/2016 12/30/2016 12/30/2016 12/30/2016 12/30/2016 Comments Electronic Data Set, Filename: C- 31 C_LW D_FINAL — INAL_ FIELD_COMPOSITE_10DEC 2016 BHI CTK.las Electronic File: 10398698 11-2-2016.pdf Electronic File: C- 31C_Post_Run_09_USR_10398698.pdf, , Electronic File: C- 31 C_Post_Run_11 _USR_10398698. pdf ' Electronic File: C - 31C_ GR_ Res_ 10Dec2016_MD_FINAL_FIELD_B - HI_CTK.cgm Electronic File: C- 31 C_GR_Res_ 10Dec2016_TVDSS_FINAL_FIEL D_BH I_CTK.cgm Electronic File: C- 31 C_GR_Res_10D EC2016_MD_FI NAL_F I ELD_ BHI_CTK.pdf ' Electronic File: C - 31C_ GR—Res _ 10DEC2016_TVDSS FINAL FIE LD_BHI_CTK.pdf Electronic File: C -31C Final Survey Report.pdf Electronic File: C -31C Final Survey Report.txt Electronic File: C -31C Final Surveys.csv Electronic File: C -31C Final Surveys.xls . Electronic File: C- 31 C_25_tapescan_BH I_CTK.txt AOGCC Page 1 ol'4 Thursday, March 16, 2017 DATA SUBMITTAL COMPLIANCE REPORT 3/16/2017 Permit to Drill 2161340 Well Name/No. PRUDHOE BAY UNIT C -31C Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21775-03-00 MD 13612 TVD 9027 Completion Date 12/15/2016 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 27844 Digital Data 12/30/2016 Electronic File: C-31C_5_tapescan_BHI_CTK.txt ED C 27844 Digital Data 12/30/2016 Electronic File: C-31C_output.tap ED C 27844 Digital Data 12/30/2016 Electronic File: C- 31 C_GR_ Res_ 10Dec2016_MD_FI NAL_F I ELD_B HI CTK.tif ED C 27844 Digital Data 12/30/2016 Electronic File: C- 31 C_GR_Res_ 10Dec2016_TVDSS_FINAL_FIEL D BHI CTK.tif Log C 27844 Log Header Scans 0 0 2161340 PRUDHOE BAY UNIT C -31C LOG HEADERS ED C 27918 Digital Data 10822 13514 1/17/2017 Electronic Data Set, Filename: C- 31C_MRPM_PNC3D_RAW_PASS01DOWN_12J - AN2017 BHI.las ED C 27918 Digital Data 10826 13514 1/17/2017 Electronic Data Set, Filename: C- 31C_MRPM_PNC3D_RAW_PASS02UP_12JAN2 ' 017 BHI.las ED C 27918 Digital Data 1/17/2017 Electronic File: C- 31C_MRPM_PNC3D_RAW_PASS01_DOWN_12 ' JAN2017 BHI.dlis ED C 27918 Digital Data 1/17/2017 Electronic File: C- 31C_MRPM PNC3D_RAW_PASS02UP_12JAN2, 017 BHI.dlis ED C 27918 Digital Data 1/17/2017 Electronic File: C- 31 C_MRPM_PNC3D_RAW_12JAN2017_BHl.me to ED C 27918 Digital Data 1/17/2017 Electronic File: C - p 31C_MRPM_PNC3D_RAW_12JAN2017_BHI.PD i F Log C 27918 Log Header Scans 0 0 2161340 PRUDHOE BAY UNIT C -31C LOG HEADERS ED C 27966 Digital Data 10822 13514 2/13/2017 Electronic Data Set, Filename: C- 31C_MRPM_PNC3D_RAW_PASS01DOWN_12J ' AN2017 BHI.las ED C 27966 Digital Data 10826 13514 2/13/2017 Electronic Data Set, Filename: C- 31 C_MRPM_PNC3D_RAW_PASS02UP_12JAN2 017_BHl.las AOGCC Page 2 of 4 Thursday, March 16, 2017 DATA SUBMITTAL COMPLIANCE REPORT 3/16/2017 Permit to Drill 2161340 Well Name/No. PRUDHOE BAY UNIT C -31C Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21775-03-00 MD 13612 TVD 9027 Completion Date 12/15/2016 Completion Status 1 -OIL Current Status 1-0I1- UIC No ED C 27966 Digital Data 2/13/2017 Electronic File: C- 31 CMRPM_PNC3D_RAW_PASS01_DOW N_12 . -2017 JAN BHI.dlis ED C 27966 Digital Data 2/13/2017 Electronic File: C- 31C_MRPM_ PNC3D_RAW_PASS02UP_12JAN2 017 BHI.dlis ED C 27966 Digital Data 2/13/2017 Electronic File: C- 31 C_ MRPM_PNC3D_RAW_12JAN2017_BHl.me - ta ED C 27966 Digital Data 2/13/2017 Electronic File: C- P 31C_MRPM_PNC3D_RAW_12JAN2017_BHI.PD ' F Log C 27966 Log Header Scans 0 0 2161340 PRUDHOE BAY UNIT C -31C LOG HEADERS Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report Production Test Informatioro/ NA Geologic Markers/Tops 0 COMPLIANCE HISTORY Completion Date: 12/15/2016 Release Date: 11/17/2016 Description Comments: AOGCC Directional / Inclination Data 0 Mechanical Integrity Test Information Y�7/rvA Daily Operations Summary 'I Y �J�/� Date Comments Page 3 of 4 Mud Logs, Image Files, Digital Data Y 6 Core Chips Y le) Composite Logs, Image, Data Files Y/ Core Photographs Y "I Cuttings Samples Y /A Laboratory Analyses Y / ]J Thursday, March 16, 2017 DATA SUBMITTAL COMPLIANCE REPORT 3/16/2017 Permit to Drill 2161340 Well Name/No. PRUDHOE BAY UNIT C -31C Operator BP EXPLORATION (ALASKA) INC. MD 13612 TVD 9027 Completion Date 12/15/2016 Completion Status 1-0I1- Current Status 1-011- Compliance -OIL Compliance Reviewed By: Date: API No. 50-029-21775-03-00 UIC No AOGCC Page 4 of 4 Thursday, March 16, 2017 RECEIVE, D F/te FEB 13 2017 BAKER PRINT DISTRIBUTION LIST HUGHES AOGCC COMPANY BP Exploration Alaska Inc. WELL NAME C -31C FIELD Prudhoe Bay Unit COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Paul Canizares EMAIL Paul.Canizares(@bakerhuohes.com STATUS Final Replacement: No COMPANY ADDRESS CEDEX WILL NOT DELIVER TO P.O. 130 ] PERSON ATTENTION 21613, 27 96 6 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. DATA LOGGED Petrotechnical Data Center, 1-112-1 7. /l,5/201 1 900 E. Benson Blvd. M. K. BENDER Anchorage, Alaska 99508 Ito acknowledge receipt of this data. LOG TYPE RPM:PNC3D LOG DATE January 12, 2017 TODAYS DATE February 10, 2017 Revision Details: Rev. Requested by: FIELD / FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES 1# OF COPIES 4 4 4 IR 4 4 4 1 BP North Slope. 0 0 0 0 0 EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 2 [ConocoPhillips Alaska Inc. 0 1 1 0 0 Atm: Ricky Elgarico ATO 3-344 700 G Street Anchorage, AK 99510 3 ExxonMobil, Alaska Attn: Lynda M. Yaskell and/or Lisa Boggs 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas *** Attn: James Hyun 550 West 7th Avenue, Suite 802 Anchorage, Alaska 99501 *** Stamp "confidential' on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-I 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: David Itter TOTALS FOR THIS PAGE: TOTALS FOR ALL PAGES: 0 3 4 0 0 0 3 4 0 0 STATE OF ALASKA ' LASKA OIL AND GAS CONSERVATION COMMIS' N WELL JMPLETION OR RECOMPLETION REM. AND LOG RECEIVED JAN 2 3 2017 la. Well Status: Oil Q Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1b. Well Clats" 20AAC 25.105 20AAC 25.110909-PI, Development p❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One Service ❑ Stratigraphic Test ❑ 2 Operator Name: 6. Date Comp., Susp., or Aband.: 1 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 12/15/2016 216-134 ' 3. Address: 7. Date Spudded: L`^ 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 �_� 17- /U J'LO 50-029-21775-03-00 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 12/10/2016 PBU C -31C " 9 Ref Elevations KB 70.9 17. Field/Pool(s): Surface: 1800' FNL, 883' FEL, Sec. 19, T11N, R14E, UM Top of Productive Interval: 3260' FNL, 5014' FWL, Sec. 20, T11N, R14E, UM GL 37.32 • BF 37.82 PRUDHOE BAY, PRUDHOE OIL " 10. Plug Back Depth(MD/TVD): 18. Property Designation: Total Depth: 4018' FNL, 3432' FWL, Sec. 20, T11N, R14E, UM 13554'/ 9029' ADL 028305 ' 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. Land Use Permit: Surface: x- 664508 . y- 5959422- Zone - ASP 4 13612'/9027' 80-274 12. SSSV Depth (MD/TVD): PO Thickness of Permafrost MD/TVD: TPI: x- 670441 y- 5958094 Zone ASP 4 Total Depth: x- 668878 y- 5957301 Zone - ASP 4 None 1900' (Approx.) 5. Directional or Inclination Survey: Yes Q (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) . 11325'/8746' 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD/GR/RES, RPM/GR/CCL 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FT. GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP I BOTTOM TOP BOTTOM 20" x 30" 37' 117' 37' 117' 8 cu yds Concrete 13-3/8" 68# L-80 36' 2828' 36' 2722' 17-1/2" 3900 cu ft Permafrost 9-5/8" 47# L-80 33' 10006' 33' 7597' 12-1/4" 2335 cu ft Class 'G' 7" 29# L-80 9860' 11325' 7480' 8746' 8-1/2" 416 cu ft Class'G' 2-3/8" 4.7# L-80 11280' 13602' 8707' 9027' 3-1/4" 69sxClass'G' 24. Open to production or injection? Yes H No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation GRADE DEPTH SET (MD) PACKER SET (MD/rV Size and Number): 3-1/2" 9.3# L-80 11325' 11274'/ 8701.90' 1.56" Gun Diamter, 6 spf 13050'- 13350' 9035'-9031' COMPLETION 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 13425'-13550' 9031'- 9029' DATE Was hydraulic fracturing used during completion? Yes ❑ No 0 Per 20 AAC 25.283 (i)(2) attach electronic and printed VERIFIED information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 2500' Freeze Protect w/ 21 Bbls Diesel 27. PRODUCTION TEST Date First Production: December 25, 2016 Method of Operation (Flowing, gas lift, etc.): Flowing Date of Test: 12/28/201 Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: 6 6 Test Period 316 5793 3 95 18361 Flow Tubing 320 Press Casinq Press: 1560 Calculated 24 Hour Rate Oil -Bbl: 1262 Gas -MCF: 23172 Water -Bbl: 13 Oil Gravitv - API (corr): N/A Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only _e�&O RBDMS G L JAN 2 � 2017 2 Z�/ . ;-7 G 28. CORE DATA Conventional Core(s) Yes ❑ No 0 1 Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No 0 Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 11632' 8967' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. 23SB - Zone 28 11364' 8778' 22TS 11434' 8828' 21 TS - Zone 2A 11529' 8897' ZONE 1 B 11632' 8967' TDF - Zone to 11700' 9000' Zone 1 B (Invert) 12345' 9020' Formation at total depth: Zone 1B (From Base) 12345' 9020' 31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post -Rig Work, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Browning, Zachary H Email: Zachary.Browning@bp.com Printed Name Jo astufka Title: Drilling Technologist Signature: Phone: +1 907 564 4091 Date: INSTRUCTIONS General: This form is esigned for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only WELLHEAD = McEVOY ACTUATOR =� DEV OKB. ELEV = 67.78' REF ELEV 70.9' BF. ELEV = 37.82' KOP = 1700' Max Angle = 94" @ 13190' Datum MD = 11493' Datum TVD = 8800' SS 13-3/8" CSG, 68#, L-80 BUTT, ID = 12.415" I-1 2825' Minimum ID = 1.950" @ 11307' DEPLOY SLV XO TO 2-3/8" LINER 9-5/8"X 7" BKR LTP w / TIEBACK SLV , ID = 6.187" 9860' 9-5/8" X 7" BKR NSCC LNR HGR, ID = 6.250^ 9873' 9-5/8" CSG, 47#, L-80 NSCC/BUTT, ID = 8.681" 10006' TOC (11/22/16) 11287' TBG PUNCH (11/09/16 11287' - 11292' ELM 2-3/8" TOL/ TOC 11295' 3-1/2" BKR MONOBR WS w/2 PIPTAGS jj_L132r (RIG TAG 12/03/16) 3-1/2" HES CMT RETAINER (11/09/16) 1—{ 11360' 3-1/2" TBG, 9.3#, L-80 NSCT, .0087 bpf, ID = 2.992" (—j 11457' 17" LNR, 29#, L-80 NSCT, .0371 bpf, ID = 6.184" WHIPSTOCK W/ 2 RA TAGS I 12025' 4-1/2" LNR, 12.6#, NT -80 NSCT, .0152 bpf, ID = 3.958" ^12025' PERFORATION SUMMARY REF LOG: BHI ON 12/10/16 ANGLE AT TOP PERF: 87" @ 13050' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE I SOZ 1.56" 1 6 13050 - 13350 O 12/14/16 1.56' 6 13425 - 13550 O 12/14/16 C 31 C SAP VOTES: WELL ANGLE > —70° @ 11710'. MAX DLS: ay.2° @ 11351'. 2115' 1--] 3-1/2" OTIS SSSV LAND. NIP, ID = 2.75" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 5091 50 MMG DOME RK 16 12/24/16 2 8601 L4271 46 MMG SO RK 20 12/24/16 1 11232 29 MMG-2 DMY RK 0 04/30/03 9-5/8" SIDETRACK WINDOW - 10006' -10056' (SECTION MILL) NOTE PRE-SDTRK WELLBORE NOT SHOWN BELOW 9-5/8" MILLOUT WINDOW. — 11260' 3-1 /2" OTIS X NIP, ID = 2.75" 11274' 7" X 3-1/2" BKR SABL-3 PKR, ID = 3.85" 11295' —J 2.70" DEPLOYMENT SLEEVE, ID = 2.25" MILLOUT WINDOW (C -31C) 11325' -11336' 12174' PUP JT w /RA TAG 1 12883' 1 RETAINER (12/13/16) I-1 13554' PBTD 13554' 2-3/8" LNR, 4.7#, L-80 TH511, 13602' .0039 bpf, ID = 1.995" �MILLOUT WINDOW 12047' - 12051' PBTD ft 13674' I" 2-3/8" LNR, 4.6#, L-80 STL, .0039 bpf, ID = 1.995^A 3688' DATE REV BY COMMENTS DATE REV BY COMMENTS 02/22/88 N18E ORIGINAL COMPLETION 01/03/17 ZB/JMD FML ODEAPPROVAL 03/11/95 D-14 RIG SIDETRACK (C -31A) 01/10/17 JNUJMD EDIT TO TOP OF MOW DEPTH 04/24/03 DAV/KK CTD SIDETRACK (C-31 B) 12/15/16 NOFIXC2 CTD SIDETRACK (C-31 C) 112/27/161 JMD I DRLG HO CORRECTIONS 12/27/16 GJB/JMDGLV CO (12/24/16) PUP JT w /RA TAG PRUDHOE BAY UNIT WELL: C-31 C PERMIT No: 2161340 API No: 50-029-21775-03 SEC 19, T11 N, R14E, 1800' FNL & 883' FEL BP Exploration (Alaska) Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 1 of 21 Operation Summary Report Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3-01854-C: (2,272,050.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 12/1/2016 14:00 14:40 0.67 MOB P PRE PREP TO MOVE OFF WELL 14:40 1500 0.33 MOB P PRE PJSM WITH ALL INVOLVED PARTIES - TESTED AND VERIFIED ESD WAS FUNCTIONAL AND IS MANNED BY TOOLPUSHER VERIFIED 12 X 12 WHEEL CHOCK IN PLACE ASSIGNED SPOTTERS TO AREA OF RESPONSIBILITY - DISCUSSED THAT "STOP" IS THE COMMAND TO STOP RIG - PERFORMED RADIO CHECK PRIOR TO MOVING RIG DISCUSSED WITH CREW THAT THERE IS NO BPV / TWC INSTALLED 1500 1600 1.00 MOB P PRE MOVE RIG OFF 7-19 MOVED OFF WITHOUT ANY ISSUES PU RIG MATS 1600 2230 6.50 MOB P PRE MOVE RIG TO C-PAD 22:00 NOTIFY PARKER 272 TO PREP FOR SUSPENDING OPERATIONS WHILE NORDIC 2 IS ON THE C-PAD ACCESS ROAD 22:30 NORDIC 2 ON ACCESS ROAD AND 272 HAS SUSPENDED OPERATIONS UNTIL N2 HAS CLEARED THE ACCESS ROAD HOLD A FACE TO FACE WITH PARKER 272 WSL AND TOOL PUSHER TO DISCUSS MOVING NORDIC 2 PAST 272 22:30 23:00 0.50 MOB P PRE NOTIFY PARKER 272 TO PREP FOR SUSPENDING OPERATIONS WHILE NORDIC 2 IS ON THE ACCESS ROAD TO C-PAD 23:00 23:30 0.50 MOB P PRE RIG IS ON THE ACCESS ROAD TO C-PAD, HOLD A FACE TO FACE WITH PARKER 272 TOOL PUSHER AND WSL TO DISCUSS MOVING PAST 272 TO GET TO OUR WELL, PAD OP WAS NOT AVAILABLE AND SAID TO PROCEED 23:30 23:45 0.25 MOB P PRE MOVE NORDIC 2 PAST PARKER 272 MOVED PAST 272 WITH PLENTY OF ROOM AND NO INCIDENTS 2345 0000 0.25 MOB P PRE PREP WELL TO SPOT RIG OVER WELL 12/2/2016 00:00 00:45 0.75 MOB P PRE SPOT T-MATS VERIFY ALL CASING PRESSURES, IA & OA ARE AT 0 PSI SHUT IN ALL TREE & CASING VALVES PAD OP NOTIFIED WE ARE PREPPING TO SPOT THE RIG OVER THE WELL Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 2 of 21 Operation Summary Report Common Well Name C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00 ) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 0045 01:00 0.25 MOB P PRE PJSM TO SPOT RIG OVER WELL TESTED AND VERIFIED ESD WAS FUNCTIONALAND IS MANNED BY TOUR PUSHER VERIFIED 12 X 12 WHEEL CHOCK IN PLACE ASSIGNED SPOTTERS TO AREA OF RESPONSIBILITY DISCUSSED THAT "STOP" IS THE COMMAND TO STOP RIG j PERFORMED RADIO CHECK PRIOR TO MOVING RIG DISCUSSED WITH CREW THAT THERE IS NO BPV / TWC INSTALLED PAD OP IS HERE TO WITNESS PULLIONG - -- OVER WELL - 01:00 01:30 0.50MOB P PRE SPOT RIG OVER WELL 01:30 02:30 1.00 RIGU P PRE RIG SPOTTED AND ACCEPTED AT 01:30 AM HOLD A PJSM WITH CREW TO START RU OPERATIONS AND RU 02:30 - 03:30 1.00 RIGU P PRE CYCLE TREE VALVES, OPEN SSV, INSTALL FUSIBLE CAP AND LTT MASTER & SWAB VALVES TO REMOVE TREE CAP AND NU BOPE '03:30 05:30 2.00 RIGU P PRE REMOVE TREE CAPAND NU BOPE 05:30 0615 0.75 RIGU P PRE BOP'S NU, GET STACK MEASURMENTS 06:15 07:00 0.75 RIGU P PRE CREW CHANGE 0700 08:00 1.00 RIGU P PRE FLUID PACK STACK & CHOKE MANIFOLD 08:00 14:30 6.50 BOPSUR P PRE TEST BOPE AS PER BP. AOGCC AND NORDIC REQUIREMENTS _ 250 PSI LOWAND 3500 PSI HIGH 14:30 14:45 0.25 BOPSUR P PRE BOP TEST COMPLETED, HOLD A PJSM WITH THE GREASE CREW TO CHECK TREE BOLTS 1445 15:45 1.00 BOPSUR P PRE PU THE INJECTOR AND STAB ON WELL ALLOW GREASE CREW TO CHECK TREE BOLTS FOR PROPER TORQUE 15:45 16:40 0.92 i BOPSUR P PRE TREE BOLTS CHECKED, DISPLACE DIESEL FROM COILTO FRESH WATER TO TEST THE INNER REEL VALVEAND PACK OFF FRESH WATER AT BOTH MICRO MOTIONS SHUT DOWN AND CALIBRATE 16:40 17:05 0.42 BOPSUR ! P PRE TEST INNER REEL VALVE AND PACK OFF 17:05 17:15 0.17 BOPSUR P PRE PREP TO REVERSE CIRCULATE 17:15 19:20 2.08 BOPSUR P PRE SLACK PUMPED, HOLD A PJSM TO BLOW BACK THE COIL, PU THE INJECTOR, RU THE CUTTER AND CUT 276' OF PIPE. 19:20 20:45 1.42 BOPSUR P PRE PREPARE COIL TUBING FOR COIL CONECTOR INSTALL COIL CONNECTOR AND PULL TEST TO 38K PERFORM 350 PSI LOW/ 3900 PSI HIGH COIL CONNECTOR TEST. 20:45 - 23:00 2.25 BOPSUR P PRE INSTALL NOZZLE. PUMP WIRE FORWARD. TEST E -LINE. GOOD TEST INSTALL BHI UQC W/ FLOATS, TEST CONNECTION. GOOD TEST Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths" North America - ALASKA - BP Page 3 of 21 Operation Summary Report Common Well Name. C-31 0.08 STWHIP AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00) Project: Prudhoe Bay Site: PB C Pad TAKE MUD THROUGH THE MGS FOR THE Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:00AM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA FIRST FULL CIRCULATION BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) TAG AT 11327 AS WELL, SHUT DOWN PUMP 23:00 - 00:00 1.00 BOPSUR P PRE TEST UQC TO 350 PSI LOW / 4000 PSI HIGH. AND CLOSE THE EDC 07:05 11:00 PRESSURE TEST FLOATS TO 350 PSI LOW/ STWHIP P WEXIT 3700 PSI HIGH. GOOD TEST. 12/3/2016 00:00 01:50 1.83 BOPSUR P PRE CONTINUE CIRCULATING COIL OVER TO 1% 01:50 - 02:00 0.17 02:00 - 05:00 3.00 05:00 - 07:00 2.00 KCL OPEN WELL TO A CLOSED CHOKE. 0+ PRESSURE. BLED OFF IMMEDIATELY FILL WELL WITH 1-1/2 BBLS METHANOL. PERFORMED FLOW CHECK. PJSM FOR MAKING UP BHA STWHIP P WEXIT MAKE UP 2-3/8" WINDOW MILLING BHA #1 PICK UP 2-3/8" XTREME MOTOR (0.6 DEG AKO) AND 2-3/8"" COILTRAK TOOLS - MAKE UP 2.74" HCC WINDOW MILL/ STRING REAMER ( BOTH 2.74" GO/ 2.73" NOGO) SURFACE TESTED TOOL. GOOD TEST. PRESSURE TEST QTS TO 300 PSI LOW FOR 5 MINUTES / 4000PSI HIGH FOR 5 MINUTES - INJECTOR ON: 01:50 STWHIP P WEXIT RIH WITH 2-3/8" WINDOW MILLING BHA #1 FROM SURFACE. RATE: 0.30 BPM IN, 0.75 BPM OUT. CIRC PRESSURE: 253 PSI MUD WEIGHT: 8.34 PPG IN, 6.78 PPG OUT INITIAL ENTRY, TAKING ALL RETURNS OUT TO FLOWBACK TANK. - LOG DOWN FOR TIE-IN FROM 11,000' TO 111 07'MD (FORMATION) WITH -22.5' f - CORRECTION STWHIP P WEXIT RIH TO LIGHTLY DRY TAG WHIPSTOCK AT 11327' PU 10'. INCREASE RATE 3.00 BPM IN / 3.0 BPM OUT 8.45 PPG IN / 8.37 PPG OUT DISPLACE WELL TO MUD 07:00 07:05 0.08 STWHIP P WEXIT GOOD MUD BACK AT SURFACE, LINE UP TO TAKE MUD THROUGH THE MGS FOR THE FIRST FULL CIRCULATION LIGHTLY TAG WS AGAIN TO VERIFY DEPTH TAG AT 11327 AS WELL, SHUT DOWN PUMP AND CLOSE THE EDC 07:05 11:00 3.92 STWHIP P WEXIT START MILLING WINDOW FREE SPIN = 3960 PSI AT 1.76 BPM MILL 2.74" WINDOW PER BAKER REP FROM 11326.0' MD TO 11332' MD, FIRST STAGE OF 2 - RATE: 1.76 BPM IN, 1.76 BPM OUT CIRC PRESSURE: 4086 PSI MUD WEIGHT: 9.60 PPG IN, 9.53 PPG OUT DWOB: 0.69 - 2.98 KLBS 11:00 13:45 2.75 STWHIP P WEXIT CONTINUE MILLING WINDOW FREE SPIN = 3960 PSI AT 1.76 BPM MILL 2.74" WINDOW PER BAKER REP FROM 11326.0' MD TO 11 332'MD, FIRST STAGE OF 2 RATE: 1.76 BPM IN, 1.76 BPM OUT CIRC PRESSURE: 4047 PSI MUD WEIGHT: 9.60 PPG IN, 9.53 PPG OUT DWOB: 1.53 - 2.98 KLBS 1345 1355 0.17 STWHIP P WEXIT MILLED 6' OF WINDOW TO COMPLETE FIRST STAGE, ALLOW TO MILL OFF THEN MAKE REAM PASSES AS PER PLAN Printed 12/28/2016 10.59:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 4 of 21 Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00.00AM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:55 - 15:00 1.08 STWHIP P WEXIT START REAMING PASSES FROM 11332 TO 11320' FIRST PASS 0° UP & 0° DOWN SECOND PASS 15° LEFT UP & 0° DOWN THIRD PASS 150 RIGHT UP & 00 DOWN 15:00 15:10 0.17 STWHIP P WEXIT REAM PASSES COMPLETED, SHUT DOWN PUMP AND DRY DRIFT _ DRY DRIFT IN BOTH DIRECTIONS ARE CLEAN 15:10 15:40 0.50 STWHIP P WEXIT OPEN EDC AND FLOW CHECK WELL TO POOH GOOD NO FLOW, PURGE LUBRICATOR STACK AS PER PLAN AND NORDIC PROCEDURE THEN POOH 15:40 17:20 1.67 STWHIP P WEXIT STACK IS PURGED, POOH HOLD PJSM WHILE POOH TO SWAP MOTORS FOR 2ND STAGE OF WINDOW 1720 1735 0.25 STWHIP P WEXIT FLOW CHECK WELL 17:35 17:45 0.17 STWHIP P WEXIT GOOD NO FLOW, TAG UP, REMOVE THE INJECTOR AND PULL THE BHA 17:45 18:25 0.67 STWHIP P WEXIT LAY DOWN BHA#1 MILLAND STRING REAMER 2.74" GO / 2.73" NO GO MAKE UP WEATHERFORD FIXED BEND MOTOR AND 2.74" FAT RADIUS MILL INJECTOR ON: 18.25 18:25 20:45 2.33 STWHIP P WEXIT RIH WITH 2-3/8" DRILLING BHA #2 FROM SURFACE RATE: 0.50 BPM IN, 0.86 BPM OUT. CIRC PRESSURE: 1410 PSI MUD WEIGHT: 9.52 PPG IN, 9.55 PPG OUT LOG DOWN FOR TIE-IN FROM 11085' TO 11108' MD (FORMATION) WITH -25 CORRECTION 20:45 00:00 3.25 STWHIP P WEXIT MILL 2.74" WINDOW IN 3-1/2" x 7" CASING/LINER PER BAKER REP FROM 11332' MD TO XXXX' MD RATE: 1.62 BPM IN, 1.62 BPM OUT MUD WEIGHT: 9.55 PPG IN, 9.55 PPG OUT DWOB: 1.5K CIRC PRESSURE: 3920- 4500 PSI FOLLOW SCHEDULE PER PROGRAM 11333.4' TAKING LONGER TO MILL OFF 12/4/2016 00:00 04:00 4.00 STWHIP N DPRB WEXIT MILL 2.74" WINDOW IN 3-1/2" x 7" CASING PER BAKER REP RATE: 1.63 BPM IN, 1.63 BPM OUT MUD WEIGHT: 9.58 PPG IN, 9.52 PPG OUT DWOB: 3.0 - 3.5 KLBS CIRC PRESSURE: 3900 PSI 11333.50' EXTREMELY SLOW MILL OFF. 04:00 06:00 2.00 STWHIP N DPRB WEXIT ONCE 1.4' MILLED. START WORKING WOB UP. NO REAL INCREASE IN MOTOR WORK. VERY LITTLE CUTTINGS COMING ACROSS SHAKERS PU TO VERIFY PARAMETERS PU CLEAN. INCREASE RATE TO 1.75 BPM @ 4190# 736# DIFFERENTIALAT MOTOR Printed 12/28/2016 10:59:07AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 5 of 21 Operation Summary Report Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time, 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 06:20 0.33 STWHIP N DPRB WEXIT NOT MAKING ANY PROGRESS IN THE LAST 6 HOURS MAINTAINED <3.5K WOB AS PER THE PLAN FOR THE FIRST 1.4'. SLOWLY INCREASED WOB TO TRYAND MILL THE WINDOW UP TO 5.2K WOB BUT NOT MAKING ANY PROGRESS IN ALMOST 6 -HRS. CALL ODE AND DISCUSS PULLING TO CHECK THE MOTOR & MILL HAVE HCC BRING ANOTHER MILL TO WEATHERFORD AND HAVE IT TORQUED UP READY TO GO WHEN WE GET TO SURFACE. 06:20 06:35 0.25 STWHIP N DPRB WEXIT FLOW CHECK WELAND POOH TO CHECK _ THE MOTOR & MILL 06:35 08:10 1.58 STWHIP N DPRB WEXIT POOH TO CHECK THE MOTOR & MILL 07:55 HOLD A PJSM TO PULL THE BHAAND CHECK THE MOTOR & MILL 08:10 08:30 0.33 STWHIP N DPRB WEXIT FLOW CHECK WELL 08:30 09:00 0.50 STWHIP N DPRB WEXIT GOOD NO FLOW, TAG UP, REMOVE THE INJECTOR AND PULL THE BHA BHA OOH, TRANSMISSION ON THE MOTOR IS j BROKE/SHEARED OUT I MILL STILL IN GAUGE AT 2.74 GO 2.73 NO GO i CALL ODE AND DISCUSS PU ANOTHER WEATHERFORD MOTOR AND MILLAND RIH 09:00 09:30 0.50 STWHIP N DPRB r WEXIT ODEAGREE'S TO RUN 2ND 2.0° MOTORAND NEW FAT RADIUS MILL, MU BHA MILL GAUGED 2.74 GO 2.73 NO GO 09:30 11:35 2.08 STWHIP N DPRB WEXIT BHA MU, RIH 11:35 11:50 0.25 STWHIP N DPRB WEXIT LOG TIE IN 11:50 12:20 0.50 STWHIP N DPRB WEXIT CORRECT DEPTH -25' AND RIH TO CONTINUE MILLING THE WINDOW WT CK = 38K, RIH WT = 14K FREE SPIN = 4120 AT 1.75 BPM RIH AT 1FPM FROM THE TOW TO CASING CONTACT -11334.6' Printed 12/28/2016 10:59 07AM `All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 6 of 21 Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31 A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:20 15:30 3.17 STWHIP P WEXIT GETTING A LITTLE MOTOR WORK BUT NO WOB AT 11335.8' BTT HAND WANTS TO SEE -2K WOB RAN INTO 11336.8' WITH 1.32K WOB AND STOPPED, WOB FELL OFF JUST AFTER STOPPING AND DIFFERENTIAL PRESSURE DRILLED OFF AS WELLAND TOOLFACE FLOPPED TO 90-1000 ROHS BASED ON DEPTH, WE SHOULD BE 1.8' OUTSIDE THE WINDOW FLAG A BOTTOMS UP SAMPLE BOTTOMS UP +20 BBLS SAMPLE = NO FORMATION JUST METALAND CMT 2+ BOTTOMS UP SAMPLE = SAME, NO FORMATION DISCUSS WITH ODE, CONTINUE MILLING AS AS IF WE WERE CONTINUING FROM 11333.6', WORST CASE WE MILL LITTLE FORMATION AT A SLOWER ROP BUT INSURES WE DON'T JUMP OUT TO SOON 15:30 16:50 1.33 STWHIP P WEXIT MILLED 1' PAST PROPOSED BOTTOM OF THE WINDOW, APPLY MORE WOB TO DRILL 10' OF RAT HOLE 11 340'SAMPLE SHOWS A TRACE OF FORMATION 16:50 18:35 1.75 STWHIP P WEXIT MILLED 10' OF RAT HOLE, ALLOW TO DRILL OFF THEM START REAMING PASSES AS PER PLAN 11334.7' MOTOR WORK COMING UP BUT MILLED OFF 11336.5' LIGHT MOTOR WORK 400# WOB TD SAMPLE 80% FORMATION A LITTLE MOTOR WORKAT 11334.7' NO WOB CHANGE FINISHED REAMING PASSES. PERFORM DRY DRIFT WITH NOI ISSUES, BOTH DIRECTIONS. 18:35 20:45 2.17 STWHIP P WEXIT MONITOR WELL FOR 10 MINUTES: STATIC MUD WEIGHT: 9.61 PPG IN, 9.50 PPG OUT RATE: 1.96 BPM IN, 1.95 BPM OUT OPEN EDC, POH FROM 11 320'MD TO SURFACE RATE: 1.95 BPM. CIRC PRESSURE: 3959 PSI 20:45 - 21:35 0.83 STWHIP P WEXIT MONITOR WELL FOR 10 MINUTESAT BHA: STATIC CLOSE EDC, POWER DOWN INJECTOR OFF: 21:10 2.74" GO / 2.73" NOGO BLOW DOWN TOOLS / OFFLOAD WEATHERFORD MOTOR 21:35 22:05 0.50 STWHIP P WEXIT MAKE UP 2-3/8" DRILLING BHA #4 - PICK UP 2-3/8" LOW SPEED MOTOR (1.9 DEG AKO) AND 2-3/8" COILTRAK TOOLS MAKE UP 3-1/4" HYCALOG BICENTER BIT SURFACE TESTED TOOL. GOOD TEST. PRESSURE TEST QTS TO 300 PSI LOW FOR 5 MINUTES / 3500 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 22:05 Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 7 of 21 Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00 ) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00 OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:05 00:00 1.92 STWHIP P WEXIT RIH WITH 2-3/8" DRILLING BHA #4 FROM SURFACE - RATE: 0.70 BPM IN, 1.08 BPM OUT. CIRC PRESSURE: 1267 PSI MUD WEIGHT: 9.47 PPG IN, 9.48 PPG OUT 12/5/2016 00:00 00.15 0.25 STWHIP P WEXIT CONTINUE IN HOLE 0015 00:30 0.25 STWHIP P WEXIT LOG TIE IN WITH A-28' CORRECTION 00:30 01:00 0.50 STWHIP P WEXIT SAT DOWN AT 11337' MULTIPLE TIMES. TRIED AT MULTIPLE ORIENTATIONS. NO LUCK. CALLAND DISCUSS WITH ODE. DECISION TO PULL TO DRESS WINDOW PER OCN #2 01:00 02:45 1.75 STWHIP N DPRB 11,339.00 WEXIT MONITOR WELL FOR 10 MINUTES: STATIC MUD WEIGHT: 9.52 PPG IN, 9.47 PPG OUT RATE: 1.51 BPM IN, 1.04 BPM OUT OPEN EDC, POH FROM 11300' TO SURFACE RATE: 1.51 BPM. CIRC PRESSURE: 2500 PSI 02.45 - 03:05 0.33 STWHIP N DPRB 11,339.00 WEXIT MONITOR WELL FOR 10 MINUTES AT BHA: STATIC CLOSE EDC, POWER DOWN INJECTOR OFF: 03:05 LAY DOWN BUILD BHA 03:05 - 03:45 0.67 STWHIP N DPRB 11,339.00 WEXIT MAKE UP 2-3/8" MILLING BHA#5 - PICK UP 2-3/8" XTREME MOTOR (1.9 DEG AKO) AND 2-3/8" COILTRAK TOOLS - MAKE UP 2.74" BAKER THROUGH TUBING CRAYOLA MILL (2.75" GO / 2.74" NOGG) SURFACE TESTED TOOL. GOOD TEST. PRESSURE TEST QTS TO 320 PSI LOW FOR 5 MINUTES / 3500 PSI HIGH FOR 5 MINUTES -INJECTOR ON: 03:45 03:45 0550 2.08 STWHIP N DPRB 11,339.00 WEXIT RIH WITH 2-3/8" MILLING BHA#5 - RATE: 0.66 BPM IN, 0.93 BPM OUT. CIRC PRESSURE: 1230 PSI MUD WEIGHT: 9.48 PPG IN, 9.44 PPG OUT 0550 06:10 0.33 STWHIP N DPRB 11,339.00 WEXIT LOG TIE IN 06:10 - 06:25 0.25 STWHIP N DPRB 11,339.00 WEXIT CORRECT DEPTH -29.5', RIH 0625 06:30 0.08 STWHIP N DPRB 11,339.00 WEXIT CLOSE THE EDC AND RIH DRY LOOKING FOR A TAG 06:30 06:40 0.17 STWHIP N DPRB 11,339.00 WEXIT DRY TAG AT 11335.6 PU WT 36K STOP AT 11320 AND BRING THE MOTOR UP TO RATE Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 8 of 21 Common Well Name: C-31 DRIFT THROUGH THE WINDOW AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00) Project: Prudhoe Bay Site: PB C Pad PU AND TRY DRIFTING THROUGH AGAIN, NO Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA THE BOTTOM OF THE WINDOWAND WE BPUOI: Active datum: C -31A/13 OKB @70.90usft (above Mean Sea Level) THE CRAYOLA MILL IN BETWEEN THE 2 Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:05 14:35 1.50 STWHIP N DPRB 11,339.00 06:40 11:55 5.25 STWHIP N DPRB 11,339.00 WEXIT RIH LOOKING FOR MOTOR WORK WEXIT GOOD NO FLOW, TAG UP, REMOVE THE INJECTOR AND PULL THE BHA WORK DOWN LOOKING FOR MOTOR WORK WEXIT RIH WITH 2-3/8" MILLING BHA#6 - RATE: 1.86 BPM IN, 1.86 BPM OUT. CIRC STALL AT 11331.72 PRESSURE: 4100 PSI MUD WEIGHT: 9.55 PPG IN, 9.45 PPG OUT MOTOR WORKAT 11331.24, WORK DOWN LOG DOWN FOR TIE-IN FROM 11 050'TO 11 085'MD (FORMATION) WITH -29' FROM HERE CORRECTION - COME ONLINE. RIH AT 1 FPH THROUGH STALLAT 11334.13, PU AND WORK DOWN WINDOW. NO ISSUES SEEN. TAG AT 11346' DRILL AHEAD TO 11350' PUMP SAMPLE UP. 11335.17 MOTOR WORK 100% FORMATION. - REAM WINDOW PER OCN#3. NO MOTOR 11335.4' STALL WORK SEEN. - DRY DRIFT WITH NO ISSUE. PUMP 10 BBL 11339.9' STALL, PU AND WORK BACK DOWN HI VIS PILL DOWN WHILE MAKING ONE LAST UP/ DOWN AT AS DRILLED AT 1 FPH. 11339.9 MOTOR WORK, TF FLOPPED TO 105° AND IS STAYING THERE BUT NOT STALLING MILLED OFFAND TF IS BACKAT 15° ROHS, RIH AT 0.05 11340.1' RIGHTAT THE BOTTOM OF THE WINDOW, MOTOR WORKAND TF ROLLED TO -135 ROHS MOTOR WORK NOT DRILLING OFF OR TD ROLLING BACK TO HS CALL ODE AND DISCUSS PU AND TRY TO DRY DRIFT 11:55 - 12:55 1.00 STWHIP N DPRB 1 11,339.00 WEXIT PU AND SHUT DOWN PUMP AND TRY TO Printed 12/28/2016 10:59:07AM 'All depths reported in Drillers Depths' DRIFT THROUGH THE WINDOW DRIFTED CLEAN TO 11343.4' THEN TAGGED, TF STILLAT 15° ROHS TRY ROLLING PUMP AT 0.5 BPM TO ROLL OFF AND PASS THROUGH, NO GO PU AND TRY DRIFTING THROUGH AGAIN, NO GO, STOP AND CALL ODE, WSUP, ETLAND DISCUSS OPTIONS SINCE THIS IS RIGHT AT THE BOTTOM OF THE WINDOWAND WE COULD POTENTIALLY BURY THE NOSE OF THE CRAYOLA MILL IN BETWEEN THE 2 STRINGS OF CASING. 1255 13:05 0.17 STWHIP N DPRB 11,339.00 WEXIT DECISION MADE TO POOH AND PU A PAROBOLIC MILLAND STRING MILL FLOW CHECK WELL 13:05 14:35 1.50 STWHIP N DPRB 11,339.00 WEXIT GOOD NO FLOW, POOH 14:35 14:50 0.25 STWHIP N DPRB 11,339.00 WEXIT FLOW CHECK WELL 14:50 16:00 1.17 STWHIP N DPRB 11,339.00 WEXIT GOOD NO FLOW, TAG UP, REMOVE THE INJECTOR AND PULL THE BHA 16:00 23:00 7.00 STWHIP N DPRB 11,339.00 WEXIT RIH WITH 2-3/8" MILLING BHA#6 - RATE: 1.86 BPM IN, 1.86 BPM OUT. CIRC PRESSURE: 4100 PSI MUD WEIGHT: 9.55 PPG IN, 9.45 PPG OUT LOG DOWN FOR TIE-IN FROM 11 050'TO 11 085'MD (FORMATION) WITH -29' CORRECTION - COME ONLINE. RIH AT 1 FPH THROUGH WINDOW. NO ISSUES SEEN. TAG AT 11346' DRILL AHEAD TO 11350' PUMP SAMPLE UP. 100% FORMATION. - REAM WINDOW PER OCN#3. NO MOTOR WORK SEEN. - DRY DRIFT WITH NO ISSUE. PUMP 10 BBL HI VIS PILL DOWN WHILE MAKING ONE LAST UP/ DOWN AT AS DRILLED AT 1 FPH. Printed 12/28/2016 10:59:07AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 9 of 21 Operation Summary Report Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00 ) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2300 - 00:00 1.00 STWHIP N DPRB 11 339.00 WEXIT MONITOR WELL FOR 10 MINUTES: STATIC 12/6/2016 00:00 00:45 0.75 STWHIP 0045 01:15 0.50 STWHIP 01:15 - 0200 0.75 DRILL 02:00 - 04:30 2.50 DRILL 04:30 - 06:30 2.00 DRILL 06:30 - 1020 3.83 DRILL 1020 - 13:15 2.92 DRILL 13:15 - 15:20 2.08 DRILL N DPRB 11,339.00 WEXIT N DPRB 11,339.00 WEXIT N DPRB 11,339.00 PROD1 N DPRB 11,339.00 PROD1 P PROD1 P PROD1 P PROD1 P PROD1 Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths* MUD WEIGHT: 9.52 PPG IN, 9.45 PPG OUT RATE: 1.99 BPM IN, 1.63 BPM OUT OPEN EDC, POH FROM 11 300'MD TO SURFACE RATE: 1.99 BPM. CIRC PRESSURE: 3834 PSI CONTINUE OUT OF HOLE MONITOR WELL FOR 10 MINUTES AT BHA: STATIC - CLOSE EDC, POWER DOWN -INJECTOR OFF: 01:05 - MILLAND STRING REAMER 2.74" GO / 2.73" NOGO MAKE UP 3-1/4" DRILLING BHA #7 - PICK UP 2-3/8" LS MOTOR (1.9 DEG AKO) AND 2-3/8" COILTRAK TOOLS MAKE UP 3-1/4" HYCALOG BICENTER BIT SURFACE TESTED TOOL. GOOD TEST. PRESSURE TEST QTS TO 300 PSI LOW FOR 5 MINUTES / 3500 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 01:50 RIH WITH 3-1/4" DRILLING BHA #7 FROM SURFACE TO 11050' MD - RATE: 1.05 BPM IN, 1.41 BPM OUT. CIRC PRESSURE: 1720 PSI MUD WEIGHT: 9.45 PPG IN, 9.45 PPG OUT LOG DOWN FOR TIE-IN FROM 11050' TO 11085' MD (FORMATION) WITH -30.5' CORRECTION DRILL 3-1/4" BUILD FROM 11350' - FREE SPIN: 4050 PSI, 1.63 BPM (790# DIFFERENTIAL) - RATE: 1.63 BPM IN, 1.63 BPM OUT. CIRC PRESSURE: 4150 PSI - MUD WEIGHT: 9.52 PPG IN, 9.45 PPG OUT, ECD: 11.45 PPG DRILL 3-1/4" BUILD FROM 11400' - FREE SPIN: 4050 PSI, 1.63 BPM (826# DIFFERENTIAL) - RATE: 1.64 BPM IN, 1.62 BPM OUT. CIRC PRESSURE: 4120 PSI - MUD WEIGHT: 9.58 PPG IN, 9.53 PPG OUT, ECD: 11.48 PPG 11500' SAMPLE HAD 20% CHERT DRILL 3-1/4" BUILD FROM 11500' - FREE SPIN: 4050 PSI, 1.63 BPM (846# DIFFERENTIAL) - RATE: 1.64 BPM IN, 1.62 BPM OUT, CIRC PRESSURE: 4050 PSI - MUD WEIGHT: 9.59 PPG IN, 9.53 PPG OUT, ECD: 11.50 PPG 11550' SAMPLE HAD 15-20% CHERT DRILL 3-1/4" BUILD FROM 11600' - FREE SPIN: 4050 PSI, 1.63 BPM (843# DIFFERENTIAL) - RATE: 1.64 BPM IN, 1.62 BPM OUT. CIRC PRESSURE: 4160 PSI - MUD WEIGHT: 9.59 PPG IN, 9.53 PPG OUT, ECD: 11.60 PPG North America - ALASKA - BP Page 10 of 21 Operation Summary Report Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:20 - 17:45 2.42 DRILL P PROD1 DRILL 3-1/4" BUILD FROM 11600' 17:45 - 21:00 3.25 DRILL 21:00 - 22:05 1.08 DRILL - FREE SPIN: 4050 PSI, 1.63 BPM (843# DIFFERENTIAL) - RATE: 1.64 BPM IN, 1.62 BPM OUT. CIRC PRESSURE: 4160 PSI - MUD WEIGHT: 9.59 PPG IN, 9.53 PPG OUT, ECD: 11.60 PPG P PROD1 LANDED THE BUILD, CIRC OH CLEAN THEN DYNAMIC FLOW CHECK WELL. DYNAMIC FLOW CHECK IS GOOD. PUMP SWEEPS OUT, POOH. PUMP 2.09 BPM/4,100 PSI WHILE POOH. P PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC CLOSE EDC, POWER DOWN INJECTOR OFF: 21:05 BIT GRADE IS 1-3. TURN MOTOR TO 0.99 DEG AKO. MAKE UP 2-3/8" DRILLING BHA #8 - PICK UP 2-3/8" ULS MOTOR (0.99 DEG AKO) AND 2-3/8" COILTRAK TOOLS MAKE UP 2.70 X 3.25" HCC BICENTER BIT SURFACE TESTED COILTRAK TOOL. GOOD TEST. - PRESSURE TEST QTS TO 300 PSI LOW FOR Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths* 5 MINUTES / 3,800 PSI HIGH FOR 5 MINUTES - INJECTOR ON. 22.05 22:05 - 00:00 1.92 DRILL P PROD1 RIH WITH 2-3/8" DRILLING BHA #8 - RATE: 0.99 BPM IN, 1.35 BPM OUT. CIRC PRESSURE: 1,660 PSI MUD WEIGHT: 9.50 PPG IN, 9.53 PPG OUT LOG DOWN FOR TIE-IN FROM 11,360' (RA) WITH OL TF, APPEAR TO BE STACKING AT WINDOW. 12/7/2016 00:00 01:20 1.33 DRILL P PROD1 - PICK BACK UP TO 11,060' FOR FORMATON TIE-IN, CORRECT -27'. RIH AFTER TIE-IN DEPTH. CAN'T PASS WINDOW AT OL, 0 PUMP, 20 FT/MIN. PICK UP AND ORIENT, PASS WINDOWAT 30R, 0 PUMP, 20 FT/MIN. CLEAN PASS TO BOTTOM. 01:20 03:30 2.17 DRILL P PROD1 DRILL 3.25" LATERAL FROM 11,810' MD TO 11,860' MD FREE SPIN: 3,850 PSI, 1.70 BPM RATE: 1.70 BPM IN, 1.70 BPM OUT. CIRC PRESSURE: 3,850 - 4,050 PSI - MUD WEIGHT: 9.57 PPG IN, 9.52 PPG OUT, ECD: 11.63 PPG - ROP: 30 - 40 FT/HR, WOB: 2 - 3 KLBS 0330 06:30 3.00 DRILL P PROD1 DRILL 3.25" LATERAL FROM 11,860' MD TO 12,000' MD - FREE SPIN: 3,850 PSI, 1.62 BPM - RATE: 1.70 BPM IN, 1.70 BPM OUT. CIRC PRESSURE: 3,850 - 4,100 PSI - MUD WEIGHT: 9.56 PPG IN, 9.50 PPG OUT, ECD: 11.62 PPG ROP: 50 - 70 FT/HR, WOB: 2 - 3 KLBS AT 11,910' PUMP 10 BBLS LO / HI VIS SWEEPS AROUND. Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths* Printed 12/28/2016 10:59:07AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 11 of 21 Operation Summary Report Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050,00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00 OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKS @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06.30 - 07:20 0.83 DRILL P PROD1 DRILL 3.25" LATERAL FROM 12,030' MD FREE SPIN: 3,850 PSI, 1.62 BPM RATE: 1.63 BPM IN, 1.63 BPM OUT. CIRC PRESSURE: 4089 PSI - MUD WEIGHT: 9.56 PPG IN, 9.53 PPG OUT, ECD: 11.68 PPG ROP: 50 - 70 FT/HR, WOB: 2 - 3 KLBS 07:20 07:35 0.25 DRILL P PROD1 DD TRIGGERED A SURFVEY DURING CHANGE OUT WHILE WHILE OFF MBOTTOM FOR JORPS THE SURVEY DID NOT PASS THE REQUIREMWNTS FOR JORPS PU OFF BOTTOM AND PERFORM ANOTHER CHECK SHOT SURVEY, IF IT DOES NOT PASS 'WE WILL TRIP TO THE CASED HOLE TO LOG TIE IN AND VERIFY WE ARE ON DEPTH 0735 10:00 2.42 DRILL P PROD1 CHECK SHOT PASSED JORPS REQUIREMENTS, RIH TO CONTINUE DRILLING 10:00 11:15 1.25 DRILL P PROD1 DRILL 3.25" LATERAL FROM 12,030' MD FREE SPIN: 3,850 PSI, 1.62 BPM RATE: 1.63 BPM IN, 1.63 BPM OUT. CIRC PRESSURE: 3999 PSI MUD WEIGHT: 9.62 PPG IN, 9.55 PPG OUT, ECD: 11.72 PPG ROP: 35 - 70 FT/HR, WOB: 2 - 3 KLBS 11:15 11:55 0.67 DRILL P PROD1 DRILLED 450', PERFORM 850' WIPER AS PER PLAN THEN CONTINUE DRILLING ECD = 11.76 PPG 11:55 13:50 1.92 DRILL P PROD1 BACK ON BOTTOM DRILLING FREE SPIN: 3920 PSI, 1.62 BPM RATE: 1.63 BPM IN, 1.63 BPM OUT. CIRC PRESSURE: 4026 PSI - MUD WEIGHT: 9.58 PPG IN, 9.56 PPG OUT, ECD: 11.71 PPG - ROP: 71 FT/HR, WOB: 1.84 KLBS, ECD = 11.70 PPG DRILLING IN & OUT OF SHALE STRINGERS 13:50 16:30 2.67 DRILL P PROD1 DRILL 3.25" LATERAL FROM 12,350' MD FREE SPIN: 3,850 PSI, 1.62 BPM RATE: 1.62 BPM IN, 1.61 BPM OUT. CIRC PRESSURE: 4095 PSI - MUD WEIGHT: 9.56 PPG IN, 9.52 PPG OUT, ECD: 11.70 PPG ROP: 50 FT/HR, WOB: 2.5-3.0 KLBS 1630 - 1740 1.17 DRILL P PROD1 DRILL 3.25" LATERAL FROM 12,350' MD FREE SPIN: 3,850 PSI, 1.62 BPM RATE: 1.62 BPM IN, 1.61 BPM OUT. CIRC PRESSURE: 4203 PSI - MUD WEIGHT: 9.59 PPG IN, 9.55 PPG OUT, ECD: 11.70 PPG - ROP: 40 FT/HR, WOB: 2.5-3.0 KLBS PUMP 10 BBL_S EACH LOW & HIGH VIS PILLS 17:40 - 18:15 0.58 DRILL P PROD1 STARTED SEEING SOME WT ISSUES AT 12510' THINKING IT MIGHT BE ANOTHER SHALE BUT IT NEVER DEVELOPED ON THE GAMMA LOG, THIS IS A PARTIAL USED MUD SYSTEM THAT THAT IS AT 1.1% DRILL SOLIDS. PREP PITS TO SWAP TO NEW MUD Printed 12/28/2016 10:59:07AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 12 of 21 Operation Summary Report Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00 ) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:15 - 19:40 1.42 DRILL P PROD1 ON NEW MUD. 19:40 - 21:20 1.67 DRILL P 21:20 - 22:30 1.17 DRILL P 22:30 00:00 1.50 DRILL P 12/8/2016 0000 00:20 0.33 DRILL P 00:20 01:00 0.67 DRILL P 01:00 - 0330 2.50 DRILL P PROD1 BACK ON BOTTOM DRILLING. TAG BOTTOM REPEATEDLY WITH DIFFERENT PUMP RATES AND RUNNING SPEEDS, GETTING VERY LITTLE DWOB OR MOTOR WORK. DISCUSS WITH ODE, DECISION IS MADE TO PULL FOR AGITATOR. PROD1 MONITOR WELL FOR 10 MINUTES USING DYNAMIC FLOW CHECK, GOOD. MAINTAIN AS DRILLED TF THROUGH SHALES. - MUD WEIGHT: 9.60 PPG IN, 9.55 PPG OUT OPEN EDC, POH FROM WINDOW. TRY TO JET WHIPSTOCK TRAY, LIGHT TAG AT WINDOW WHEN GOING BACK DOWN, POOH. PUMP 2.2 BPM / 4,000 PSI THROUGH OPEN EDC. Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths* WITH NEW MUD TO SURFACE DRILL 3.25" LATERAL FROM 12,680' TO 12,688' MD FREE SPIN: 3,600 PSI, 1.62 BPM RATE: 1.62 BPM IN, 1.62 BPM OUT. CIRC PRESSURE: 3,600 - 3,900 PSI - MUD WEIGHT: 9.58 PPG IN, 9.58 PPG OUT, ECD: 11.59 PPG ROP: 40 - 80 FT/HR, WOB: 2.5-3.0 KLBS PROD1 UNABLE TO GETANY DWOB AT 12,688'. PULL 850 FT WIPER BACK TO 11,850' AS PER MODIFIED WIPER TRIP SCHEDULE IN WELL PLAN. PERFORM WIPER TRIP TO 11,850' FROM 12,688- - RATE: 1.62 BPM IN, 1.48 BPM OUT. CIRC PRESSURE: 3,500 PSI '-CLEAN PASS UP AND DOWN. AFTER WIPER TRIP STILL UNABLE TO DRILL, GETTING NO DWOB OR MOTOR WORK EVEN IF RIH TO BOTTOM AT 60 FT/MIN. DISCUSS WITH ODE, DECIDE TO PULLABOVE WINDOWAND OPEN EDC, PUMP SWEEPS AROUND IN THE CASING. MUD ENGINEER PERFORMS THOROUGH CHECK OF NEW MUD SYSTEM, FINDS EVERYTHING IN SPEC. AT 59/6 LUBES. PROD1 PERFORM JOG AT WINDOW THEN PULL THROUGH AND OPEN EDC. 'PUMP 2.24 BPM / 4,220 PSI WHILE PULLING UP SLOWLY, WAIT FOR HI -VIS PILL TO FINISH MIXING. GETTING GOOD AMOUNT OF CUTTINGS BACK THROUGH THE FIRST B/U, AROUND 50% MORE THAN DURING DRILLING. TIE IN DEPTH AT 11,020' CORRECT +17 FT. PROD1 PUMP ANOTHER B/U WITH 10 BBLS LO / HI VIS SWEEPS AROUND. RUN IN TO WINDOWAND CLOSE EDC. PASS WINDOW WITH NO ISSUES AT 20R, 20 FT/MIN, 0 PUMP. RIH TO BOTTOM, CLEAN PASS. PROD1 CONTINUE WIPER TRIP TO BOTTOM. PROD1 BACK ON BOTTOM DRILLING. TAG BOTTOM REPEATEDLY WITH DIFFERENT PUMP RATES AND RUNNING SPEEDS, GETTING VERY LITTLE DWOB OR MOTOR WORK. DISCUSS WITH ODE, DECISION IS MADE TO PULL FOR AGITATOR. PROD1 MONITOR WELL FOR 10 MINUTES USING DYNAMIC FLOW CHECK, GOOD. MAINTAIN AS DRILLED TF THROUGH SHALES. - MUD WEIGHT: 9.60 PPG IN, 9.55 PPG OUT OPEN EDC, POH FROM WINDOW. TRY TO JET WHIPSTOCK TRAY, LIGHT TAG AT WINDOW WHEN GOING BACK DOWN, POOH. PUMP 2.2 BPM / 4,000 PSI THROUGH OPEN EDC. Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 13 of 21 Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00 ) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 0330 - 0415 0.75 DRILL P PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: PUMP AT MAX RATE TO CLENA UP THE WS TRAY, THEN PU TO 11250 AND CIRC OUT HIGH VIS PILL WHILE PU PULLED HEAVYAT 11247' RIGHTAT THE X -NIPPLE RIH AND SET DOWN WT AT 11254' PU AND PULL HEAVYAND RBIH AND SET DOWN AT THE SAME DEPTH PU AND PULLED HEAVY AGAIN CALL ODE AND DISCUSS OPTIONS TO CLEAN UP THE WELL Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths' STATIC CLOSE EDC, POWER DOWN INJECTOR OFF: 03:50 BIT IS 1-1, SLIGHT RINGING ON THE NOSE. 04:15 04:40 0.42 DRILL P PROD1 FUNCTION TEST BOPS FROM THE DRILLERS PANEL. 0440 0520 0.67 DRILL P PROD1 MAKE UP 2-3/8" DRILLING BHA #9 - PICK UP 2-3/8" ULS MOTOR (0.99 DEG AKO) AND 2-3/8" COILTRAK TOOLS MAKE UP 2.74 X 3.25" HYC BICENTER BIT SURFACE TESTED COILTRAK TOOL. GOOD TEST. - PRESSURE TEST QTS TO 300 PSI LOW FOR 5 MINUTES / 3,800 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 05:20 05:20 07:45 2.42 DRILL P PROD1 RIH WITH 2-3/8" MILLING BHA #9 RATE: 0.75 BPM IN, 1.1 BPM OUT. CIRC PRESSURE: 1,340 PSI MUD WEIGHT: 9.53 PPG IN, 9.54 PPG OUT LOG DOWN FOR TIE-IN FROM 11055' TO 11082' MD (FORMATION) 07:45 08:10 0.42 DRILL N DPRB 11,334.00 PROD1 CORRECT DEPTH -24.5', RIH SET DOWN AND POPPED THROUGH AT 11260' NO INDICATION AT WOB SENSOR, POSSIBLY X -NIPPLE AT THIS DEPTH RIH AND SET DOWN AT 11299' WITH 3.4K WOB PU AND INCREASE RATE THROUGH THE EDC START 10 BBLS PILL RIH AND TAG AT 11258, POPPED THROUGH TAG AT 11297', POPPED THROUGH, PU TO 11 250'WITH A COUPLE BOBBLES CLOSE THE EDC WITH THE HIGH VIS PILLAT THE EDC TO PUMP OUT THE BIT, RIH CIRCULATING AT 0.5 BPM WEIGHT BOBBLES AT SAME DEPTH BUT RUNNING CLEAN PAST 11299 CONTINUE RIH TO WINDOW SHUT DOWN PUMP LIGHTTAG IN WINDOWAT 11327, PU TO UP WT AND GO BACK DOWN PASSED THROUGH, PUMP AT FULL RATE TO 11570' AND PUH TO THE BOTTOM OF THE WINDOW, JOG IN HOLE AND REPEAT TO CLEAN UP DEBRIS IN THE WELL HIGH VIS PILL BROUGHT UP SOME CUTTINGS 08:10 10:00 1.83 DRILL N DPRB 11,334.00 PROD1 OPEN EDC AT THE WS, PILLAT THE EDC, PUMP AT MAX RATE TO CLENA UP THE WS TRAY, THEN PU TO 11250 AND CIRC OUT HIGH VIS PILL WHILE PU PULLED HEAVYAT 11247' RIGHTAT THE X -NIPPLE RIH AND SET DOWN WT AT 11254' PU AND PULL HEAVYAND RBIH AND SET DOWN AT THE SAME DEPTH PU AND PULLED HEAVY AGAIN CALL ODE AND DISCUSS OPTIONS TO CLEAN UP THE WELL Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths' North America - ALASKA - BP Page 14 of 21 Operation Summary Report Common Well Name: C-31 DPRB 13:20 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00 ) Project: Prudhoe Bay Site: PB C Pad 0.08 13:40 Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) N DPRB Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) N (usft) 11,334.00 10:00 - 10:20 0.33 DRILL N DPRB 11,334.00 PROD1 DECISION MADE TO CLOSE THE EDC AND 10:20 - 11:25 li 1.08 14:30 16:30 16:30 16:50 16:50 17:35 17:35 18:45 DRILL DRILL DRILL DRILL DRILL 2.00 DRILL 0.33 DRILL 0.75 DRILL 1.17 DRILL N i DPRB 13:20 1.92 11:25 _ 13:20 I 13:35 0.25 1335 13:40 0.08 13:40 14:30 0.83 14:30 16:30 16:30 16:50 16:50 17:35 17:35 18:45 DRILL DRILL DRILL DRILL DRILL 2.00 DRILL 0.33 DRILL 0.75 DRILL 1.17 DRILL N i DPRB 11,334.00 PROD1 I N DPRB 11,334.00 PROD1 PROD1 N DPRB 11,334.00 N DPRB 11,334.00 PROD1 N DPRB 11,334.00 PROD1 PROD1 N DPRB 11,334.00 N DPRB 11,334.00 PROD1 N DPRB 11,334.00 PROD1 N DPRB 34.00 PROD1 Printed 12/28/2016 10:59:07AM 'All depths reported in Drillers Depths' PUMP THROUGH THE BIT FOR BETTER AGITATION TO GET DOWN TO THE WINDOW, STIR THE CUTTINGS UP AND CHASE UP HOLE PUH AND TIE IN TO MAKE SURE WE ARE ON DEPTH AFTER A FEW OVER PULLS BEFORE RIH WITH THE BIT SPINNING CLOSE TO THE _WINDOW CORRECT DEPTH +6' WHICH MAKES SENSE, NIPPLE IS AT 11260 AND WE WERE TAGGING AT 11254' CLOSE THE EDC AND RIH AT MIN RATE PAST GLM 1 AT 11232 THEN INCREASE RATE TO 1.5 BPM DOWN TO 11315', 10' ABOVE THE TAG AT 8 FPM AND STALL MOTOR AT 11257', PU AND PULL 9K OVER START MOTOR AND WORK DOWN AT 2-3 FPM STALLAGAIN WITH 3.2K WOB AND DOES NOT FALL OFF PU AND 4K OVER PULL CALL ODE AND DISCUSS ANOTHER STRATEGY TO CLEAN UP THE TUBING SEND A LOW & HIGH VIS PILL DOWN DECISION MADE TO POOH PUMPING AT MAX RATE TO CLEAN UP THE TUBING AND FOR A D331 MILL & REAMER TO CLEAN UP THE TUBING & PAST WS FLOW CHECK WELL GOOD NO FLOW, TAG UP, REMOVE THE INJECTOR AND PULL THE BHA BHA IS OK BIT GRADE = 1 -2 -BT MU CLEAN OUT BHA#10 BHA MU, RIH LOG TIE IN CORRECT DEPTH -29', CLOSE THE EDC, RIH AND CLEAN OUT AS PER OCN #5 TAG AT THE BOTTOM OF THE WINDOW, PU AND PULL TO 11200' NOT ABLE TO GET THROUGH WINDOW. PUMP 10 BBLS HI -VIS SWEEPS AROUND, RECIPROCATE PIPE FROM TOP WHIPSTOCK PAST BOTH NIPPLES. NOTHING SEEN IN RETURNS. North America - ALASKA - BP Operation Summary Report Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00 ) Page 15 of 21 Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00.00AM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:45 22:40 3.92 DRILL N DPRB 11,334.00 PROD1 REDUCE PUMP TO 0.8 BPM, RIH TO DRIFT WINDOW. NO-GO, LIGHT TAG AT 11,334' AND PICK UP, TRY AT 1.8 BPM, LIGHT TAG AT 11,334' AND PICK UP. CLEAN PICKUPS EACH TIME. PICK UP THROUGH NIPPLES AGAIN THEN BACK DOWN FOR DRY DRIFT. DRY DRIFT IS CLEAN TO 11,310'. PICK UP ABOVE NIPPLES AND OPEN EDC. FLOW CHECK HERE IS GOOD, NO FLOW. POOH, PUMP 2.23 BPM / 4,030 PSI THROUGH OPEN EDC. MUD WEIGHT 9.59 PPG IN, 9.52 PPG OUT. POOH AT 60 FT/MIN UP TO 3,000 FT TO CLEAN TANGENT SECTION. 22:40 23:30 0.83 DRILL N DPRB 11,334.00 PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC CLOSE EDC, POWER DOWN INJECTOR OFF: 22:40 MILLAND REAMER BOTH 2.74" GO, 2.73" NO-GO MAKE UP 2-3/8" DRILLING BHA #11 - PICK UP 2-3/8" ULS MOTOR (0.99 DEG AKO) AND 2-3/8" COILTRAK TOOLS MAKE UP 2.74 X 3.25" HYC BICENTER BIT SURFACE TESTED AGITATOR TOOL. GOOD TEST. PRESSURE TEST QTS TO 30OPSI LOW FOR X MINUTES / 3,700 PSI HIGH FOR 5 MINUTES INJECTOR ON: 23:30 23:30 00:00 0.50 DRILL N DPRB 11,334.00 PROD1 RIH WITH 2-3/8" DRILLING BHA#11 RATE: 1.13 BPM IN, 1.51 BPM OUT. CIRC PRESSURE: 1,850 PSI MUD WEIGHT: 9.51 PPG IN, 9.52 PPG OUT 12/9/2016 00:00 - 02:30 2.50 DRILL N DPRB 11,334.00 PROD1 CONTINUE RIH WITH BHA#11 - LOG DOWN FOR TIE-IN FROM 11,030' (FORMATION) WITH -28' CORRECTION - LOG CCL FROM 11,200' SENSOR DEPTH. SET DOWN AT 11,338' AT 20R, 15 FT/MIN, 0 PUMP, PICK UP AND ORIENT TO 30R. PASS WINDOWAT 30R, 20 FT/MIN, 0 PUMP. STOP AT 11,345'AND RESTART CCL LOG. 02:30 03:10 0.67 DRILL P PROD1 LOG CCL PAST LINER TOP SETTING AREA. RIH TO BOTTOM, PUMP 0.6 BPM KEEP AS DRILLED TF. CLEAN PASS TO BOTTOM. 03:10 05:40 2.50 DRILL P PROD1 DRILL 3.25" LATERAL FROM 12,690' MD TO 12800' MD FREE SPIN: 4,000 PSI, 1.68 BPM RATE: 1.68 BPM IN, 1.68 BPM OUT. CIRC PRESSURE: 4,000 -4,300 PSI - MUD WEIGHT: 9.59 PPG IN, 9.57 PPG OUT, ECD: 11.63 PPG - ROP: 40 - 70 FT/HR, WOB: 2 - 3 KLBS PULL 100 FT WIPER FROM 12,800', CLEAN PASS UP AND DOWN. Printed 12/26/2016 10:59:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 16 of 21 Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00 ) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:40 - 06:10 0.50 DRILL P PROD1 DRILL 3.25" LATERAL FROM 12 800' MD TO Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths* .I 12,820' MD FREE SPIN: 4,000 PSI, 1.68 BPM RATE: 1.68 BPM IN, 1.68 BPM OUT. CIRC PRESSURE: 4,000 - 4,300 PSI - MUD WEIGHT: 9.59 PPG IN, 9.57 PPG OUT, ECD: 11.63 PPG ROP: 40 - 70 FT/HR, WOB: 2 - 3 KLBS 06:10 07:25 1.25 DRILL P PROD1 DRILL 3.25" LATERAL FROM 12,820' MD FREE SPIN: 4,000 PSI, 1.68 BPM RATE: 1.68 BPM IN, 1.68 BPM OUT. CIRC PRESSURE: 4,000 - 4,340 PSI - MUD WEIGHT: 9.59 PPG IN, 9.57 PPG OUT, ECD: 11.67 PPG ROP: 40 - 80 FT/HR, WOB: 1.5 - 3 KLBS 07:25 07:45 0.33 DRILL P PROD1 NOTABLE TO GET WOB, STACKING WT AND PULLING HEAVY ON PICK UPS PUH 500' FOR A SHORT WIPER TO SEE IF IT WILL HELP 07:45 10:00 2.25 DRILL P PROD1 BACK ON BOTTOM DRILLING WITH GOOD WEIGHT TRANSFER AND SURFACE WT 10:00 10:40 0.67 DRILL P PROD1 CONTUNUE DRILLING AHEAD WITH BHA WIPERS NEEDED TO KEEP WOB DRILL 3.25" LATERAL FROM 12,800' MD FREE SPIN: 4230 PSI, 1.68 BPM RATE: 1.68 BPM IN, 1.68 BPM OUT. CIRC PRESSURE: 4230 - 4590 PSI - MUD WEIGHT: 9.59 PPG IN, 9.57 PPG OUT, ECD: 11.73 PPG ROP: 30-40 FT/HR, WOB: 1.5 - 3 KLBS 10:40 11:50 1.17 DRILL P PROD1 STACKING WT, PU'SAFTER DRILL OFFS ARE PULLING HEAVY PUMP A 3 BBL WEIGHTED SWEEP RATE = 1.68 BPM, FREE SPIN = 4230 PSI, CIRC PSI =4560 PSI WITH 1.8K WOB, ECD = 11.72 PPG WITH THE WEIGHTED PILL IN THE VERTICAL SECTION OF THE WELL THE ECD = 11.81 PPG SURFACE WEIGHT WITH PILLAT THE BIT= -4TO -8K SURFACE WEIGHT WITH PILL IN THE CASED HOLE _ +8K TO +12K - SIGNIFICANT INCREASE IN SURFACE WEIGHT DENSITY IN = 11.42 PPG, DENSITY OUT = 9.87 PPG MAX, DUMPED 17 BBLS SAMPLE FROM 12975' (8962' TVD) HAS HOT, TARGET 8960' TVD WITH THE WEIGHTED SWEEP ALL IN THE CASED HOLE, SURFACE WEIGHT HAS INCREASED 13K 11:50 12:10 0.33 DRILL P PROD1 STUCK ON BOTTOM, WORK PIPE A FEW TIMES WHILE PUMP IS DOWN SET DOWN WEIGHT TO 0 AND WAIT WATCHING ECD AND WOB WOB STARTING TO INCREASE STRAIGHT PULL TO MAX WTAND PULLED FREE ONLINE WITH PUMP, PUH 200' THEN RIH TO - CONTINUE DRILLING Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths* .I North America - ALASKA - BP Page 17 of 21 Operation Summary Report Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00 ) Project: Prudhoe Bay Site. PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00 OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:10 - 13:00 0.83 DRILL P PROD1 CONTINUE DRILLING AHEAD 13:00 13:40 0.67 DRILL P 13:40 14:25 0.75 DRILL P 1425 14:40 0.25 DRILL P 14:40 15:40 1.00 DRILL P 15:40 1630 0.83 DRILL P 16:30 17:40 1.17 DRILL P FREE SPIN PRESSURE HAS COME UP FROM 4000 PSI AT 1.68 BPM TO 4420 PSI CALL ODE AND DISCUSS BRINGING OUT ANOTHER 290 BBLS TO DUMP AND DILUTE THE SYSTEM TO BRING DOWN THE CIRC PRESSURE WITHOUT SWAPPING OUT THE WHOLE SYSTEM AND HAVING ISSUES TRYING TO DRILLAFTER SWAPPING TO NEW MUD PROD1 WIPER TRIP TO THE WINDOW, NEW WIPER STRATEGY IS ON HOLD_ FOR NOW PROD1 AT THE WINDOW, JOG IN HOLE 200' AS PER DISCUSSION WITH ODE & ETL PULL ABOVE PUMP ANOTEHRB 3 BBL WEIGHTED SWEEP AS PER PLAN AND DOCUMENT PARAMETERS PU TO 11020' AND LOG DOWN WHILE WEIGHT PILL IS COMING OUT PROD1 LOG TIE IN PROD1 CORRECT DEPTH +19.5' CONTINUE RIH PUMPING THROUGH THE EDC WHILE WEIGHTED SWEEP IS COMING OUT AND RECORD PARAMETERS TRY PASSING THROUGH WINDOW AT 30° ROHS, TAGGING UP TRY PASSING THROUGH WINDOW AT 20° ROHS, TAG TRY PASSING THROUGH WINDOW AT 0° TAG SHUT DOWN PUMP AND PASSED THROUGH WITHOUT ANY PROBLEMS, "LESSONS LEARNED" BRING PUMP ONLINE AND JET EDC ACROSS THE WS TRAY WEIGHTED PILLAT SURAFCE DID NOT BRING UP ANY EXTRA CUTTING ONLY CHANGE WHILE PUMPING IN THE CASED HOLE WAS AN INCREASE IN ECD FROM 11.72 PPG TO 12.01 PPG PROD1 CLOSE THE EDC AND RIH TO CONTINUE DRILLING PROD1 BACK ON BOTTOM DRILLING DRILL 3.25" LATERAL FROM 13120' MD TO 13,204' - FREE SPIN: 4250 PSI, 1.68 BPM - RATE: 1.68 BPM IN, 1.68 BPM OUT. CIRC PRESSURE: 4250 - 4457 PSI - MUD WEIGHT: 9.60 PPG IN, 9.52 PPG OUT, ECD: 11.70 PPG ROP: 60-80 FT/HR, WOB: 1.2 - 2 KLBS AT 13,200' PUMP 3 BBLS 11.5 PPG SWEEP Printed 12/28/2016 10:59:07AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 18 of 21 Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1740 - 1850 1.17 DRILL N STUC 13,204.00 PROD1 AT 13,204' WEIGHT AND PRESSURE DRILLS OFF. TRY TO PICK UP AND NO MOVEMENT, STUCK ON BOTTOM. CYCLE PIPE -8K TO 68K WITH PUMP DOWN, NO MOVEMENT. PUMP 1 B/U WHILE PREPPING PITS FOR MINERAL OIL. OFFLOAD MUD TO MAKE ROOM FOR KCL SPACER. BACK TRUCK IN THAT HAS THE SPACER, 3% VISCOSIFIED KCL BRINE. FINISH PUMPING WEIGHTED SWEEP TO SURFACE BEFORE STARTING ANOTHER SWEEP DOWNHOLE. SWEEP DOESN'T RETURN ANY ADDITIONAL CUTTINGS. DUMP 10 BBLS OUT TO CUTTINGS BOX WHEN SWEEP RETURNS. 18:50 20:15 1.42 DRILL N STUC 13,204.00 PROD1 SHUT DOWN PUMP AND LET HOLE RELAX WHILE FINISHING MINERAL OIL PREP. CYCLE PIPE 3 TIMES -10K TO 69K, NO MOVEMENT. PUMP 11 BBLS 3% VISCOSIFIED KCL BRINE, 20 BBLS MINERAL OIL, 11 BBLS VISCOSIFIED BRINE. PUMP 10 BBLS OIL OUTANDAROUND BHA, LET IT SOAK. KEEP BHA IN TENSION, POPS FREE WITH 8 BBLS OIL OUT. 20:15 22:50 2.58 DRILL P PROD1 CIRCULATE OIL OUT OF OPEN HOLE, CONTINUE DRILLING. DRILL 3.25" LATERAL FROM 13,202' MD TO 13,358' - FREE SPIN: 3,900 PSI, 1.73 BPM RATE: 1.73 BPM IN, 1.68 BPM OUT. CIRC PRESSURE: 3,900 - 4,300 PSI - MUD WEIGHT: 9.58 PPG IN, 9.51 PPG OUT, ECD: 10.53 PPG NOTE: MINERAL OIL STILL GETTING PUMPED UPHOLE WHILE DRILLING, RESULTING IN LOWER ECD. - ROP: 60-80 FT/HR, WOB: 1.2 - 2 KLBS AT 13,270' PUMP 5 BBLS WEIGHTED 11.5 PPG SWEEP. SLIGHTLY MORE CUTTINGS RETURNED WITH SWEEP. NO EFFECT ON ECD OR DRILLING WEIGHT. Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths* J North America - ALASKA - BP Operation Summary Report Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00 ) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time, 1/2/1988 12:00 OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Description of Operations Date From - To Hrs Task Code (hr) - RATE: 1.55 BPM IN, 1.40 BPM OUT. CIRC 22:50 00:00 1.17 DRILL P 12/10/2016 00:00 02:30 2.50 DRILL P 0230 05:25 2.92 DRILL P 05:25 06:35 1.17 DRILL P 06:35 0840 2.08 DRILL P Page 19 of 21 Printed 12/28/2016 10:59:07AM 'All depths reported in Drillers Depths` BPUOI: NPT NPT Depth Phase Description of Operations (usft) PROD1 PERFORM SHORT WIPER TRIP 500' FROM 13,358' MD - RATE: 1.55 BPM IN, 1.40 BPM OUT. CIRC PRESSURE: 4,080 PSI - CLEAN PASS UP AND DOWN DRILL 3.25" LATERAL FROM 13,358' MD TO 13,386' - FREE SPIN: 4,100 PSI, 1.53 BPM - RATE: 1.53 BPM IN, 1.50 BPM OUT. CIRC PRESSURE: 4,100 - 4,350 PSI MUD WEIGHT: 9.58 PPG IN, 9.59 PPG OUT, ECD: 11.76 PPG ROP: 60-90 FT/HR, WOB: 1.2 - 3 KLBS AT 13,385 FT PUMP 10 BBLS LO / 5 BBLS WEIGHTED SWEEPS AROUND. PROD1 DRILL 3.25" LATERAL FROM 13,386' MD TO 113,511- - FREE SPIN: 4,200 PSI, 1.53 BPM - RATE: 1.57 BPM IN, 1.53 BPM OUT. CIRC PRESSURE: 4,200 - 4,550 PSI - MUD WEIGHT: 9.61 PPG IN, 9.59 PPG OUT, ECD: 11.76 PPG - ROP: 60-90 FT/HR, WOB: 1.2 - 3 KLBS START DUMP AND DILUTE WITH 290 BBL OF NEW MUD. PROD1 STACKING WEIGHT AT 13,511'. AFTER 100' WIPER CAN'T GET BACK TO BOTTOM. TRY 200' WIPER, SAME RESULT. NOT STACKING AT BHA BUT SOMEWHERE HIGHER UP. PERFORM LONG WIPER TRIP TO WINDOW FROM 13,511' MD - RATE: 1.62 BPM IN, 1.46 BPM OUT. CIRC PRESSURE: 4,100 PSI PERFORM JOG AT WINDOW THEN PULL THROUGH. PUMP 10 BBLS LO -VIS FOLLOWED BY 7 BBLS 11.5 PPG SWEEP AROUND THROUGH OPEN EDC. 2.26 BPM / 4,150 PSI. GETTING AROUND 60% MORE CUTTINGS BACK WITH HIGHER RATE, LASTS FOR ABOUT 1.5 X B/U. WEIGHTED SWEEP BRINGS BACKA SMALL SLUG OF CUTTINGS. TIE-IN DEPTH ABOVE WINDOW, CORRECT +23'. PROD1 RIH TO WINDOWAND CLOSE EDC. PASS WINDOWAT 30R, 23 FT/MIN, 0 PUMP. SET ABOUT 3K DOWN THEN POP THROUGH WHEN THE ORIENTER SELF -CORRECTS. PROD1 DRILL 3.25" LATERAL FROM 13,386' MD TO 13,511' - FREE SPIN: 4125 PSI, 1.65 BPM - RATE: 1.64 BPM IN, 1.64 BPM OUT. CIRC PRESSURE: 4,204 - 4,400 PSI - MUD WEIGHT: 9.63 PPG IN, 9.56 PPG OUT, ECD: 11.80 PPG - ROP: 60-90 FT/HR, WOB: 1.2 - 3 KLBS SEVERAL PU'S WITH OVER PULLS JUST TO KEEP THE BHA MOVING Printed 12/28/2016 10:59:07AM 'All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Page 20 of 21 Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00 ) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00.00AM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:40 - 08:45 0.08 DRILL P PROD1 DRILL 3.25" LATERAL FROM 13,386' MD TO 13,511' - FREE SPIN: 4125 PSI, 1.65 BPM - RATE: 1.64 BPM IN, 1.64 BPM OUT. CIRC PRESSURE: 4,204 - 4,400 PSI - MUD WEIGHT: 9.63 PPG IN, 9.56 PPG OUT, ECD: 11.80 PPG - ROP: 60-90 FT/HR, WOB: 1.2 - 3 KLBS STARTA 10 BBL LOW VIS AND 5 BBL WEIGHTED SWEEP 08:45 09:40 0.92 DRILL P PROD1 DRILLED OFF AT 13600, PU AND PULLED HEAVY TO MAX WT DROP PUMP AND STACK OUT WT PULL TO MAX WT AND PULLED FREE PUH 200' THEN RIH AFTER PULLINNG 200' WE ARE STILL SEEING RATTY UP WT, KEEP PU TILL IT CLEANS UP PULLED TO 13100', RIH TO CONTINUE DRILLING STACKING OUT WHILE TRYING TO RIH, REDUCE SPEED AND ABLE TO RIH BUT LOOKS LIKE A LOT OF STICK SLIPPING AS WE RUN IN CLOSE TO TD PILLS COMING OUT PILLS OUT CHASE UP HOLE UNTIL THEYARE IN THE CASED HOLE 09:40 10:35 0.92 DRILL P PROD1 13250' PILLS IN THE CASED HOLE, GO BACK TO BOTTOM AND TRY TO DRILL RIH AND STACKED OUT, LET SIT FOR A FEW SECONDS AND SLIDES WE CAN NOT KEEP PIPE MOVING, DISCUSSED EARLIER WITH ODE AND WE WILL WIPE TO THE WINDOW COUNTING THIS AS 1 WIPER TRIP, TIE IN THEN GO BACK TO BOTTOM AND DRILL TO TD. 11890' PULL 1 OK OVER, RIH LOOKS LIKE THE SHALE AT 11840 AT THE CTC LOW VIS & WEIGHTED SWEEP BROUGHT LITTLE INCREASE IN CUTTINGS FOR A FEW - - BBLS 10:35 11:00 0.42 DRILL P PROD1 JOG IN HOLE 200', THEN PUH TO LOG TIE IN AT THE WS RA MARKER 11:00 1210 1.17 DRILL P PROD1 CORRECT DEPTH +15' AND RIH SETTING DOWN IN SHALEAREA 13390,13395 NO MOTOR WORK, PU AND RIH STACKING WT BUT MAKINGING THROUGH, MIN RATE ON _ PUMP 12:10 12:45 0.58 DRILL P PROD1 BACK ON BOTTOM DRILLING, NEED 7' TO TD FREE SPIN: 4125 PSI, 1.65 BPM RATE: 1.69 BPM IN, 1.67 BPM OUT. CIRC PRESSURE: 4400 - 4655 PSI - MUD WEIGHT: 9.64 PPG IN, 9.58 PPG OUT, ECD: 11.92 PPG ROP: 25 FT/H R, WOB: 1.2 - 1.8 KLBS Printed 12/28/2016 10:59:07AM `All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 21 of 21 Common Well Name: C-31 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/1/2016 End Date: 12/10/2016 X3 -01854-C: (2,272,050.00 ) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00 OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:45 - 13:40 0.92 DRILL P PROD1 WE CAN NOT MAKE ANYMORE FOOTAGE AND 13:40 - 14:35 0.92 DRILL P 14:35 14:45 0.17 DRILL P 14:45 15:10 0.42 DRILL P 15:10 - 16:15 1.08 DRILL P 16:15 - 16:25 0.17 DRILL P 16:25 PU'SARE GETTING HEAVIER 0.58 GEO SAYS 13610 IS GOOD AND CALLED TD P WIPE TO THE WINDOW START LINER PILL DOWN WITH BEADS PU WT IS SURGING FROM 38K TO 53K, 17:15 NOTHING ON THE WOB SUB LIKE WE HAVE DRILL DEBRIS IN THE HOLE IT IS ACTING LIKE PROD1 FRICTION, STICK & SLIP AND ITS CAUSING THE RETURN RATE TO FLUCTUATE AS WELL, NO MOTOR WORK LIKE DEBRIS IS PASSING BY THE BIT. CALL ODE AND DISCUSS LINER PILL WITH BEADS OPTIONS FOR THE LINER IF WE HAVE 21:10 PROBLEMS GETTING IT TO TD DRILL STICK SLIPPING REDUCED AT 12600', 1000' PROD1 OF WHAT LOOKED LIKE FRICTION _PROBLEMS _ PROD1 AT THE WINDOW, JOG IN HOLE 200', PUH SLOW THEN SHUTDOWN THE PUMP TO PULL WITH BEADS. THRIUGH THE WINDOW OPEN THE EDC AND JET ACROSS THE WS PUMPANOTHER 10 LOW VIS AND 5 WEIGHTED PILL PROD1 LOG TIE IN WHILE CIRCULATING UP PILLS PROD1 CORRECT DEPTH +11' BOTTOMS UP BROUGHT UPA LITTLE EXCESS THROUGH OPEN EDC. CUTTINGS FOR A FEW BBLS THEN DROPPED OFF CIRCA SECOND BOTTOMS UP PROD1 RETURNS HAVE CLEANED UP, SHUT DOWN, CLOSE THE EDC AND RIH TO CONFIRM TD REDUCE RATE TO <0.5 BPM ON TRIP IN HOLE TO SIMULATE THE LINER TO SEE IF WE CAN AT SURFACE, SHALLOW HOLE CHECK OF DRIFT TO TD PROD1 TAG TD AT 13612', TRIP IN HOLE WAS CLEAN AT THE REDUCED RATE MOVING A LITTLE FLUID FROM PIT 5 TO 4 21:10 THEN ADD BEADS TO LINER PILL 16:25 17:00 0.58 DRILL P PROD1 START LINER PILL DOWN WITH BEADS 17:00 17:15 0.25 DRILL P PROD1 FLOW CHECK WELL TO POOH LAYING IN LINER PILL WITH BEADS 17:15 21:10 3.92 DRILL P PROD1 GOOD NO FLOW, POOH LAYING IN LINER PILL WITH BEADS. CONTINUE POOH, PUMP 2.13 BPM / 3,900 PSI THROUGH OPEN EDC. FLAG PIPE 11,012' AND 8,725' EOP. AT SURFACE, SHALLOW HOLE CHECK OF AGITATOR IS GOOD. 21:10 22:10 1.00 DRILL P PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC CLOSE EDC, POWER DOWN INJECTOR OFF: 21:05 BIT IS 2-2,2 CHIPPED CUTTERS. ALL FURTHER ENTRIES ON THE CON REPORT FOR 12/10/16. Printed 12/28/2016 10:59:07AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 1 of 10 Operation Summary Report Common Well Name: C-31 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/10/2016 End Date: 12/15/2016 X3 -01854-C: (967,141.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/10/2016 22:10 - 00:00 1.83 CEMT P RUNPRD REMOVE BHI UQC AND CT CONNECTOR. 12/11/2016 00:00 - 06:15 6.25 06:15 07:50 1.58 07:50 08:10 0.33 08:10 - 09:50 1.67 CEMT P CEMT - P - CEMT P CEMT N DPRB 09:50 - 11:55 2.08 CEMT N DPRB PUMP OUT 202 FT OF CABLE SLACK. INSTALL CABLE BOOT. CUT OFF 8' OF CT TO FIND GOOD PIPE. INSTALL BTT CONNECTOR, PULL TEST TO 35K. PRESSURE TEST TO 250 / 3,500 PSI, GOOD. 'PUMP 3/4" DRIFT BALL THROUGH REELAND RETRIEVE. RUNPRD PREP RIG FLOOR TO RUN LINER. RIG UP FARR TONGS, SET INJECTOR ON BLOCKS. VERIFY PIPE TALLY WITH WSL, TOOLPUSHER, DRILLER AND BTT REP. PJSM FOR MAKING UP LINER. MAKE UP 2-3/8" L-80 TH511 LINER AS PER APPROVED LINER SUMMARY. DRIFT FIRST 5 TH511 CONNECTIONS. FILL AFTER 35 AND 71 JTS. CONDUCT KICK WHILE TRIPPING DRILL WITH ORLOFF CREW WHILE DRIFTING THE CONNECTION. DRILLER SOUNDS BOP HORN, CREW RESPONDS BY LAYING DOWN DRIFT, LAYING DOWN THE JOINT OF LINER THAT WAS HANGING. SAFETY JOINT IS MOVED TO THE CATWALK AND PICKED UP, MADE UP TO THE LINER WITH THE CORRECT XO. WELL SIMULATED SHUT IN AROUND 90 SEC. DRILL IS ENDED, UD SAFETY JOINT AND CONTINUE MAKING UP LINE_R_. _ RUNPRD RIH WITH LINER RUNPRD STOP AT WINDOW FLAG EOP FLAG = 8717'+ LINER BHA = 2498.55 = 11215.55 CORRECT DEPTH ELEC DEPTH = 11263.79 - 11215.55 = -48.24' CORRECTION MECH DEPTH = 8766 + 2498.55 = 11264.55 UNCORRECTED RUNPRD SET DOWN AT 11313', PU AND RIH AGAIN, SET DOWN SAME DEPTH STOP OPS UNTIL MORNING CALL IS FINISHED SHUT DOWN PUMP AND ALLOW PRESSURE TO BLEED OFF AND OUT FLOW TO STOP RIH AND TAG AT SAME DEPTH, PU AND TAG AGAIN PU ABOVE WINDOW, RIH AT 50 FPM, NO GO CALL ODE AND ETL RUNPRD DECISION MADE TO SWAP WELL TO A 9.5PPG CONTINGENT FLUID WE HAD ON LOCATION IF NEEDED AND MIX AN EP MUD LUBE PILL AND HAVE BROUGHT OUT TO LOCATION Printed 12/28/2016 11:14:15AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: C-31 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/10/2016 End Date: 12/15/2016 X3 -01854-C: (967,141,00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT (hr) (u 11:55 - 12:15 0.33 CEMT N DPRB 12:15 - 12:30 0.25 CEMT N DPRB 12:30 - 12:55 0.42 CEMT N DPRB 112:55 - 14:55 2.00 CEMT N I DPRB 14:55 15:10 0.25 CEMT N DPRB 15:10 18:00 2.83 CEMT N DPRB 18:00 19:40 1.67 CEMT N DPRB 19:40 - 23:30 3.83 CEMT N DPRB 23:30 - 00:00 0.50 CEMT N DPRB Page 2 of 10 Depth Phase Description of Operations sft) RUNPRD WELL SWAPPED TO 9.5PPG KCL, PUT ENOUGH WORKING VOLUME IN PIT 3 THEN START WORKING PIPE DOWN AS PER PLAN FORWARD FROM TOWN, UP TO 100 FPM BUT DO NOT STACK MORE THAN 10K DOWN TRY AT 35 FPM, NO GO 60 FPM, NO GO, CLEAN PU 70 FPM, NO GO, CLEAN PU 80 FPM, NO GO, CLEAN PU 100 FPM, NO GO RUNPRD NOT MAKING ANY PROGRESS, EACH SET DOWN INDICATES WE ARE RUNNING INTO SOMETHING BLUNT WITH CLEAN PU'S NO OVER PULL LIKE YOU WOULD SEE IF WE WERE MAKING PROGRESS GETTING THROUGH THE WINDOWA LITTLE AT A TIME RUNPRD CONFERENCE CALL ODE & ETL & WSUP AND DISCUSS NOT PUMPING THE EP LUBE PILL AS WE ARE NOT SEEING ANYTHING TELLING US WE WOULD BENEFIT FROM PUMPING IT DISCUSS OPTIONS GOING FORWARD TO PULL LINER TO SURFACE AND RUN A KNUCKLE, R&R INDEXING TOOL W/BENT SUB ON INDEXING GUIDE SHOE. RUNPRD ALLAGREE NOT TO PUMP EP LUBE PILLAND PREP TO POOH, STAND LINER BACK, LOOK AT EH BULL NOSE ON THE BOTTOM AND SEE WHAT IT TELLS US AND DISCUSS WHAT TO RUN ON THE END OF THE LINER. 13:00 SEND CMT CREW BACK TO THE HOUSE - HOLD PJSM WITH CREW TOSTBK LINER RUNPRD FLOW CHECK WELL RUNPRD GOOD NO FLOW, TAG UP, REMOVE THE INJECTOR, LD THE RUNNING BHAAND STBK THE LINER RUNPRD DISCUSS LINER RUNNING OPTIONS WITH BTT REP, WSL, ODE, ETL AND WELLS SUPT. DECISION IS MADE TO RUN THE R&R INDEXING TOOL WITH 1.5 DEG BENT SUB. NEW LINER SUMMARY IS MADE AND SENT TO ODE FOR REVIEW AND APPROVAL. NEW SINGLE JOINT TALLY IS MADE AND REVIEWED WITH BTT REP, DRILLER, TOURPUSHER AND RIG CREW. CONDUCT PJSM FOR MAKING UP LINER. RUNPRD M/U LINER AS PER APPROVED TALLEY WITH INDEXING TOOL ON BOTTOM ANDA PUP REMOVED TO PRESERVE THE SAME LINER TOP DEPTH. FILL LINER MIDWAY THROUGH AND PRIOR TO MAKING UP INJECTOR. RUNPRD RIH WITH LINER BHA #11 Printed 12/28/2016 11:14:15AM `All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: C-31 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/10/2016 End Date: 12/15/2016 X3 -01854-C: (967,141.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Page 3 of 10 Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/12/2016 0000 - 01:30 1.50 CEMT P RUNPRD CONTINUE RIH WITH LINER. WT CHECKAT 11,000 FT IS 36K. STOP AT FIRST FLAG AND CORRECT -48', SAME AS LAST RUN. MECHANICAL COUNTER IS ONLY 6 FT OFF. 01:30 03:30 2.00 CEMT P RUNPRD TAG AT 11,311', SET INJECTOR TRIPS FOR A LIGHT TAG EACH TIME ABOUT 3K DOWN. PICKUP 30' EACH TIME TO ALLOW TOOL TO RATCHET. PUMPING WHILE PICKING UP EACH TIME. TRY 3 TIMES AT 30 FT/MIN, 1.1 BPM, NO-GO. TRY 7 MORE TIMES AT VARIOUS RUNNING SPEEDS AND PUMP RATES, NO-GO. ON TRY #11, POP THROUGH. CONTINUE RIH, PUMP 0.8 BPM WHILE RIH. AROUND 12,950' CT STARTS PRESSURING UP. PAST 13,000' NO LONGER ABLE TO PUMP THROUGH THE CT. APPEARS TO BE BHA PLUGGING OFF, HOLE IS CLEAN. CHECKALL SURFACE LINES, SWITCH HIGH PRESSURE FILTERS, SAME RESULT. DISCUSS WITH ODE AND ETL, DECIDE TO PULL LINER OUT, AGREE FROM WELLS SUPT. AS SOON AS LINER IS IN TENSION ABLE TO PUMP THROUGH IT, THEN SET DOWN AND ITS PLUGGED AGAIN. MADE IT DOWN AS FAR AS 13,576', HOLE IS MOSTLY CLEAN. 03:30 05:00 1.50 CEMT N DFAL 13,576.00 RUNPRD POOH, PUMP THROUGH CT AND ACROSS TOP. MAINTAIN 250 PSI WHIP WHILE POOH. 10 MIN FLOW CHECKAT WINDOW IS GOOD, NO FLOW. 05:00 - 06:35 1.58 CEMT N DFAL 13,576.00 RUNPRD POOH. PUMP 1.3 BPM / 1,230 PSI THROUGH CT. HOLD A PJSM TO PULL THE BHA & LINER 06:35 06:45 0.17 CEMT N DFAL 13,576.00 RUNPRD FLOW CHECK WELL 06:45 07:30 0.75 CEMT N DFAL 13,576.00 RUNPRD GOOD NO FLOW, TAG UP, REMOVE THE INJECTOR, PULL THE UPPER BHATHEN STBK THE LINER 07:30 13:20 5.83 CEMT N DFAL 13,576.00 RUNPRD BHA OOH AND NO LINER AND THE LINER RUNNING TOOL IS STILL INTACT. SEND OFF SELRT FOR INSPECTION CHANGE PACK OFFSAND TEST WHILE WAITING FOR A DECISION 13:20 13:35 0.25 CEMT N DFAL 13,576.00 RUNPRD HOLD A PJSM TO MU THE SEAL STINGER BHA 13:35 14:10 0.58 CEMT N DFAL 13,576.00 RUNPRD WE HAVE APPROVAL TO MU THE SEAL STINGER BHAAND RIH 14:10 16:00 1.83 CEMT N DFAL 13,576.00 RUNPRD BHA MU, RIH WHILE TESTING THE QTS 16:00 16:10 0.17 CEMT N DFAL 13,576.00 RUNPRD STOP AT 8717 EOP FLAG MECH = 8768 ELEC = 8960.25 THIS IS A 47.5'CORRECTION, DO NOT CORRECT TO FLAG 16:10 16:30 0.33 CEMT N DFAL 13,576.00 RUNPRD RIH Printed 12/28/2016 11.14:15AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 4 of 10 Common Well Name: C-31 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/10/2016 End Date: 12/15/2016 X3 -01854-C: (967,141.00 ) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:00AM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 16:45 0.25 CEMT N DFAL 13,576.00 RUNPRD STOP AT 11228.64', CORRECT OUR DEPTH BY OUR NORMAL -28' WE HAVE BEEN CORRECTIONG TO FOR ALL OF OUR DRILLING RUNS FROM SURFACE THE 48' CORRECTION AT THE EOP FLAG IS OFF AN ADDITIONAL -20, THE DEPTHS WE ARE TAGGING AT DO NOT CORROLATE WITH THE WINDOW DEPTHS. WITH A-48' CORRECTION THE TAG DEPTHS ARE 12-14' ABOVE THE TOP OF THE WINDOW CORRECT DEPTH TO 11200.64' MECH IS AT 11,039' PU WT = 39K @ 30 FPM RIH WT = 15KAT 25 FPM 16:45 18:40 1.92 CEMT N DFAL 13,576.00 RUNPRD RIH AT 1.52 BPM AT 1930 PSI TAG AT 11294', 340 PSI INCREASE IN PSI TO 2270 PSI WITH 1:1 RETURNS TAG AT 11294 + LINER 2306.81'= 13,600.81' -11' SHALLOW FROM TD OF 13612' OR WE ARETHERE 2.26 BPM @ 4260 PSI START WORKING PIPE TO SEE IF WE CAN MOVE THE LINER DOWN HOLE WITH WEIGHT 4TH SET DOWN WE GOT -1' 5TH SET DOWN GOT ANOTHER 1' RECEIVED OCN #7, DISCUSS ADDING A HIGH VIS PILL TO CHASE OOH WITH ALL THE CIRCULATING WE HAVE DONE IN THE OH AROUND THE LINER MIXA HIGH VIS PILLAND PUMP TO THE TOL AND CHASE OOH 18:40 20:00 1.33 CEMT N DFAL 13,576.00 RUNPRD PUMP #2 FAILURE. LOSS OF CIRCULATING PRESSURE, SLB SUPERVISOR SHUTS DOWN PUMP AND C -PUMP, OPENS BAKER CHOKE. FLUID IS SEEN COMING FROM PUMP #2. SWAP TO PUMP #1 AND CONTINUE CIRCULATING AND MIXING HIGH VIS PILL WHILE CREW CLEANS UP PUMP ROOM. MAKE NOTIFICATIONS AS PER TIER 3 EVENT, NOTIFY PAD OPERATOR AND WELLS SUPT. CREATE TRACTION 2016 -IR -53_90_510. 20:00 21:00 1.00 CEMT N DFAL 13,576.00 RUNPRD PUMP 20 BBLS HI -VIS PILLAROUND. UNSTING AND PUMP IT AROUND. PUMP 2.48 / 2.36 BPM AT 3,430 PSI. IN / OUT DENSITY 9.59 / 9.53 PPG. AFTER PILL IS OUT, CONDUCT 10 MIN PUMPS OFF FLOWCHECK, NO FLOW. 21:00 23:00 2.00 CEMT N DFAL 13,576.00 RUNPRD POOH. PUMP 2.0 BPM WHILE POOH 23:00 00:00 1.00 CEMT N DFAL 13,576.00 RUNPRD LD BHA MONITOR WELL FOR 10 MINUTES AT BHA: STATIC - TAG STRIPPER, UD 6 JTS OF 2-1/16" CSH. STAND INJECTOR ON LEGS. PREP RIG FLOOR FOR RUNNING 1" CSH. Printed 12/28/2016 11:14:15AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 5 of 10 Operation Summary Report Common Well Name: C-31 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/10/2016 End Date: 12/15/2016 X3 -01854-C: (967,141.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/13/2016 00:00 - 03:20 3.33 CEMT N DFAL RUNPRD PJSM THEN MAKEUP CEMENT RETAINER BHA#15. 03:20 05:05 1.75 CEMT N DFAL RUNPRD RIH WITH CEMENT RETAINER BHA#15. - NO PUMPING DOWN THE CT WHILE RIH DUE 05:05 06:00 0.92 CEMT N DFAL 06:00 - 07:05 1.08 CEMT N DFAL 0705 - 07:20 0.25 07:20 - 08:05 0.75 08:05 08:30 0.42 CEMT N DFAL CEMT N DFAL CEMT N DFAL 08:30 09:40 1.17 CEMT P 09:40 - 10:00 0.33 CEMT P 10:00 11:40 1.67 CEMT P Printed 12/28/2016 11:14:15AM 'All depths reported in Drillers Depths' TO RISK OF PREMATURE SET OF RETAINER, ONLY HAS 0.25" BALL SEAT. MUD WEIGHT: 9.55 PPG OUT RUNPRD WTCK = 36K, RIH WT = 12K RIH INSIDE 2-3/8 LINER RUNPRD TAG AT 13585', PU AND RETAG TO CONFIRM PU WT = 42K TAG AT SAME DEPTH CALL ODE AND DISCUSS DEPTHS THAT ARE MORE CONSISTENT WITH LINER BOTTOM AT 1360_2 VS 13612 RUNPRD ODE AGREES WITH LINER BOTTOM AT 13602' BASED ON YESTERDAY AND TODAYS TAGS TAG, PU WT = 42K, RIH WT = 12K RETAG PU TO 37K AND STOP CORRECT DEPTH TO 13563 TOP OF THE FLOAT COLLAR PU TO 13555 (5' ABOVE THE LATCH COLLAR AS PER OCN) PLACING THE TOP OF THE CMT RETAINER AT 13554' RUNPRD LOAD & LAUNCH 3/8" ALUMINUM BALL RATE = 1.22 BPM AT 4090 PSI RUNPRD BALL ON SEAT AT 40.8 BBLS, PRESSURE UP TO 2000 PSI AND HOLD INCREASE PRESSURE TO 2250 AND TOOL SHEARED, SET DOWN 6K DOWN TO VERIFY RETAINER IS SET BRING RATE UP TO 1.22 BPM, CIRC PRESSURE IS LESS AT 3714 PSI SO THE LARGER FLOW PATH IS OPEN AND PUMPING BELOW THE RETAINER CALL ODE AND DISCUSS THAT RETAINER IS SET RUNPRD WE ARE GOOD TO SWAP TO 8.4 PPG KCL AND MOVE TOWARDS PUMPING CMT RUNPRD HOLD A PJSM TO BATCH AND PUMP CMT RUNPRD CONTINUE CIRCULATING 8.4 PPG KCL AROUND PT CMT LINE TO 250 LOWAND 6300 PSI HIGH PREP PITS FOR PUMPING CEMENT. Printed 12/28/2016 11:14:15AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: C-31 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/10/2016 End Date: 12/15/2016 X3 -01854-C: (967,141.00) Project: Prudhoe Bay Site. PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: - Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:40 - 13:10 1.50 CEMT P RUNPRD START MIXING CEMENT ?13:10 - 15:40 2.50 CEMT P Page 6 of 10 MIX AND PUMP 16.2 BBLS OF CEMENT: - FILL LINES WITH WATER AND PRESSURE TEST TO 6,300 PSI FOR 5 MINUTES CEMENT WET AT 1140 HRS. ZERO IN MM ONCE DENSITY = 12.3 PPG LOAD 16.2 BBLS 15.3 PPG CEMENT IN REEL SWAP TO RIG PUMP, CLEANUP LINES TO SLB UNIT. PERFORM DISPLACEMENT WITH RIG PUMPS - DISPLACE CEMENT WITH 8.4 PPG EXHAUST PILL RATE: 1.0 - 1.2 BPM IN, 1.0 - 1.2 BPM OUT ZERO OUT MM WITH CEMENTAT SHOE AT 40.3 BBLS AWAY - TAKE RETURNS TO PIT 4 FOR MANUAL STRAP - SHUT DOWN PUMPS AT 54.6 BBLS AWAY, LEAVES 2 BBLS ABOVE RETAINER. (13.3 BBLS BEHIND PIPE) PICK UP TO 55K TO UNSTING FROM RETAINER. CEMENT IN PLACE: 13:10 HRS 13.3 BBLS CEMENT BEHIND PIPE, BASED ON OUT MM, 12+ BASED ON PVT. - TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE: 1._0 BBLS RUNPRD DYNAMIC FLOW CHECK ON BOTTOM IS GOOD. POOH. FLUID WEIGHT: 8.48 PPG IN, 8.42 PPG OUT RATE: 1.44 BPM IN, 1.21 BPM OUT CIRC PRESSURE 4,160 PSI KEEP PULLING SPEED AROUND 50 FT/MIN WHILE INSIDE LINER FOR AGOOD CLEANOUT. GETTING HEAVY RETURNS FOR ABOUT 10- 20 BELS, >11 PPG. RECIPROCATE PIPE FROM 11,500' TO 13,000'. GOT SLIGHTLY HEAVY RETURNS, AROUND 8.5 - 8.8 PPG FOR ABOUT 50 BELS, DUMP TO CUTTINGS BOX. SLOW TO 10 FT/MIN PULLING PAST LINER TOP. Printed 12/28/2016 11:14:15AM *All depths reported in Drillers Depths` North America - ALASKA - BP Page 7 of 10 Operation Summary Report Common Well Name C-31 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/10/2016 End Date: 12/15/2016 X3-01854-C: (967,141.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:40 - 16:45 1.08 CEMT P RUNPRD AT 10 000' TRIP SHEET PVT SHOWS 2 BBL 16:45 19:00 2.25 CEMT P 19:00 20:45 1.75 20:45 22:30 1.75 22:30 00:00 1.50 12/14/2016 0000 02:05 2.08 CEMT P CEMT P PERFOB P PERFOB P 'All depths reported in Drillers Depths` GAIN, MM IS EVEN, NO GAIN. 10 MIN FLOWCHECK HERE IS GOOD, NO FLOW. FLUID IS COMING BACK FOAMY, GIVING FALSE PVT READINGS. DIVERT ALL RETURNS TO ONE PIT SO AGITATOR IS MORE EFFECTIVE IN KNOCKING OUT FOAM. AFTER GOOD FLOW CHECK, CONTINUE POOH. - POH UP TO 7800' WITH HIGH CIRCULATING PRESSURES, SOME DISCREPANCY IN OUT MICROMOTION. STOP MOVEMENT, CONDUCT FLOW CHECK. ALL GOOD. DISCUSS WELLBORE FLUID PROPERTIES AMONGST TEAM, DECIDE TO USE CLEAN KCL ON LOCATION FOR CIRC OUT FOR BETTER PUMPING PARAMETERS AND TO LEAVE A CLEAN FLUID FOR PERF JOB. RUNPRD ' RIH WHILE CIRCULATING. HAVE TO PICK UP AND WORK THROUGH 8000' MD TWO TIMES, TAKING WEIGHT. GET PAST, NO FURTHER ISSUES. PLACE BHA ON DEPTH ABOVE 'LINER TOP AT 11,250'. - CIRCULATE DOWN CLEAN 8.45 PPG KCL WHILE COIL OPERATORS CONDUCT CHANGEOUT AND CONFIRM CIRCULATION PLAN. CIRC PRESSURES AT 1.73 BPM DROPPED FROM 4475 PSI TO 4020 PSI. - WITH 20 BBLS CLEAN KCLAROUND AND ABOVE BHA, CIRC PRESSURES ARE 3910 PSI AT 1.81 BPM RUNPRD POH WITH BHAAT 1.97 BPM, 4300 PSI. - NO ISSUES PULLING TO SURFACE. PJSM FOR FLOW CHECK AND LAYING DOWN BHA WHILE POH. - FLOW CHECK WITH BHA BELOW BOP, NO FLOW, ALL GOOD - PULL BHA INTO BOP. POP OFF WITH INJECTOR AT 20:45. RUNPRD SET INJECTOR ON LEGS. LAY DOWN 6 JTS OF 2-1/16" CSH AMD 17 JTS OF 1" CSH. STAND BACK 30 STDS OF 1" CSH FOR THE NEXT BHA. RECOVER CEMENT RETAINER SETTING TOOL, RECOVER 3/8" BALL. OTHCMP OFFLOAD CEMENT RETAINER. LOAD PERF GUNS ONTO RIG AND PUT THEM IN ORDER. LOAD PERF GUN RUNNING EQUIPMENT ONTO RIG FLOOR. REVIEW GUN LAYOUT AND RUNNING ORDER. OTHCMP PJSM WITH TCP AND RIG CREW FOR MAKING UP PERF GUNS. MAKE UP BHA#16, PERFORATING ASSEMBLY. 'All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Common Well Name: C-31 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/10/2016 End Date: 12/15/2016 X3 -01854-C: (967,141.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:05 - 04:45 2.67 PERFOB P OTHCMP RIH WITH PERFORATING BHA#16 Page 8 of 10 Printed 12/28/2016 11,14:15AM `All depths reported in Drillers Depths' I - RATE: 1.27 BPM IN, 1.52 BPM OUT. CIRC PRESSURE: 2,000 PSI MUD WEIGHT: 8.44 PPG IN, 8.42 PPG OUT STOPAT 3,900' FOR 10 MIN FLOWCHECK DUE TO OUT MM DISCREPANCY, GOOD NO -FLOW. GETTING FOAMY FLUID BACK, ADD MORE DE -FOAM TO ACTIVE PIT. STOP AT FLAG, DEPTH DIFFERENCE IS -55FT, HOWEVER THE FLAG WASN'T TIED INTO ANYTHING ON THE PREVIOUS RUN. BOTH THE MECHANICAL COUNTER AND CTDS IS WITHIN 4 FT. CONTINUE RIH WITHOUT CORRECTING. 04:45 07:30 2.75 PERFOB N DFAL 13,571.00 OTHCMP LIGHT TAG AT 13,571'. PICK UP AND REPEAT, SAME DEPTH. GET UP WEIGHT AND CORRECT TO 13,554' TOP OF RETAINER. PICK UP TO BOTTOM SMNHOT DEPTH OF 13,550'. PJSM WITH TCP CREWAND RIG CREW FOR FIRING GUNS, START E -FIRE PRESSURE SEQUENCE. AFTER 1 SEQUENCE NO INDICATION OF FIRING. REPEAT E -FIRE PRESSURE SEQUENCE, AGAIN NO INDICATION OF FIRING. 07:30 10:15 2.75 PERFOB N DFAL 13,571.00 OTHCMP FLOW CHECK OFF BOTTOM WAS GOOD, NO -FLOW, POH WITH PERF BHA FOR INSPECTION HOLDING BACK PRESSURE ON WELL. - FLOW CHECKAT LINER TOP, NO FLOW. CONTINUE TO POH WITHOUT BACK PRESSURE. PAINT FLAG FOR NEXT PERF RUN. - PJSM FOR FLOW CHECK AND HANDLING BHA WHILE POH. - PULL BHA TO UNDER BOP STACK, FLOW CHECK. FLOW CHECK GOOD. - PULL BHA INTO BOP STACK, POP OFF WITH _- — INJECTOR 10:15 12:30 2.25 PERFOB N DFAL 13,571.00 OTHCMP BREAK OFF UPPER BHA AND LAY DOWN. STAND BACK WORK STRING JOINTS IN DERRICK. - PJSM FOR WORKING WITH PERFORATION ASSEMBLY, FOCUS ON LIVE GUNS TO SURFACE, E -FIRE HEAD, RIG FLOOR RED ZONE - INSPECT E -FIRE HEAD, NO DEFECTS. PICK UP STRING, CHECK TEMPERATURE WITH TEMP GUN AND GUNS ARE COOL (PER PROCEDURE). PICK STRING UP FURTHER, NO INDICATION SHOTS HAVE FIRED. LOWER STRING, MU SAFETY JOINT AND SPACE OUT IN BOP STACK. 1230 13:45 1.25 PERFOB N DFAL 13,571.00 OTHCMP CONDUCT DIAGNOSTIC ON E -FIRE HEAD. INDICATION THAT FIRING HEAD WAS EXPOSED TO PRESSURE SPIKE, CAUSED TOOL TO GO INTO "FAIL-SAFE" MODE. Printed 12/28/2016 11,14:15AM `All depths reported in Drillers Depths' I North America - ALASKA - BP Operation Summary Report Page 9 of 10 Common Well Name: C-31 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/10/2016 End Date: 12/15/2016 X3 -01854-C: (967,141.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (us_ft) 13:45 15:45 2.00 PERFOB N DFAL 13,571.00 OTHCMP PJSM FOR WORKING WITH FIRING HEAD, MAKING UP PERFORATION RUNNING BHA. - MAKE UP BHAAND STAB ON WITH INJECTOR 15:45 19:00 3.25 PERFOB N DFAL 13,571.00 OTHCMP PRESSURE TEST QUICK TEST SUB. - LOW PRESSURE POP OFF LIFTED WHEN BREAKING CIRCULATION DOWN COIL, OPERATION STOPPED WHILE TEAM GATHERED FOR DISCUSSION AROUND EVENT. INTERVIEWSAND INVESTIGATION BEING CONDUCTED. TRACTION REPORT WILL BE SUBMITTED AFTER MORNING REVIEW. START RIH WITH BHA#17. 19:00 21:25 2.42 PERFOB P 13,571.00 OTHCMP CONTINUE RIH WITH PERFORATION BHA. - AT FLAG, DIFFERENCE IS -27 FT VERY CONSISTENT WITH DRILLING CORRECTIONS. NO CORRECTION MADE HERE, CONTINUE TO BOTTOM. LIGHT TAG AT 13,571', SAME AS YESTERDAY. PICK UP AND REPEAT, SAME DEPTH. 'PICK UP TO CT WT LESS 5K AND CORRECT TO RETAINER DEPTH OF 13,554'. PICK UP TO SHOT DEPTH OF 13,550.67' LEAVES BOTTOM SHOT AT 13,550'. START E -FIRE SEQUENCE TO ACTIVATE FIRING HEAD. 21:25 00:00 2.58 PERFOB P 13,571.00 OTHCMP GET GOOD SHOT INDICATION FROM ACOUSTICS AND FLUID LOSS. START POOH, HOLD 250 PSI WHP. KEEP POOH SPEED < 50 FT/MIN WHILE INSIDE LINER. 10 MIN PUMPS OFF FLOW CHECKAT LINER TOP IS GOOD, NO FLOW. CONTINUE POOH. 10 MIN PUMPS OFF FLOWCHECKAT SURFACE IS GOOD, NO FLOW. PERFORATED INTERVALS: 13,050'- 13,350' 13,425' -13,550- 13,550'12/15/2016 12/15/2016 00:00 04:00 4.00 PERFOB P OTHCMP TAG STRIPPER, SET INJECTOR ON LEGS. UD BHA #17. UDALL2-1/16" CSH AND 1" CSH. STOP AT MARKER PUP AND CONDUCT PJSM WITH HES TCP CREW. DISCUSS TRAPPED PRESSURE, OVERHEAD LOADS AND WELL CONTROL. UD REMAINING 1" CSH AND ALL GUNS. 04:00 04:30 0.50 PERFOB P OTHCMP OFFLOAD PERF EQUIPMENT AND PERF GUNS. CLEAN AND CLEAR RIG FLOOR. 04:30 05:00 0.50 WHSUR P POST PJSM WITH LRS AND RIG CREW FOR FREEZE PROTECT. MAKE UP FREEZE PROTECT BHA #18. 05:00 06:00 1.00 WHSUR P POST RIH WITH FREEZE PROTECT BHA#18. LAY IN DIESEL FROM 2,500'. Printed 12/28/2016 11:14:15AM *All depths reported in Drillers Depths* North America -ALASKA - BP Operation Summary Report Common Well Name: C-31 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/10/2016 End Date: 12/15/2016 X3 -01854-C: (967,141.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/2/1988 12:00:OOAM Rig Release: 12/15/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 08:45 2.75 WHSUR P POST PREP SURFACE LINES AND MOBILIZE 08:45 - 15:45 7.00 WHSUR P 15:45 18:00 2.25 18:00 21:30 3.50 BOPSUR P BOPSUR P Page 10 of 10 EQUIPMENT FOR REEL BLOWDOWN - NITROGEN CREW RIGGED UP. CONDUCT PRESSURE CROSSCHECK DISCUSSION WITH PUMPING CREW. CONDUCT PRESSURE TEST TO 350 PSI LOW/ 3500 PSI HIGH, WSL MONITORED TRIPS ON PUMP. - CONDUCT PJSM WITH CREW FOR NITROGEN BLOW DOWN. DISCUSS PRESSURE CROSSCHECK, SAFETY PRECAUTIONS, WALK THROUGH PROCEDURE AND EXPECTED FLUID PATHS, ISOLATE REELHOUSE. - BLOW DOWN REEL WITH NO ISSUES. AVERAGE NITROGEN RATE OF CIRCULATION AT 1600 SCF AND MAX CIRCULATION PRESSURE OF 2300 PSI. POST PREP REEL FOR PULLING BACK AND SECURING FOR LOWERING. RIG CREW PROCEEDING WITH RIG MOVE PREP - SERVICE TREE, FLUID PACK WITH METHANOL, CONDUCT LEAK TIGHT TEST TO 3500 PSI BETWEEN SWAB AND MASTER. GOOD TEST OF BARRIERS, CONTINUE MONITORING THROUGH WING VALVE. - PULL COIL BACK, SECURE WITH SHIPPING BAR. - BEGIN CHANGING OUT BOP COMPONENTS WHILE REEL IS BEING SECURED. - SUBMITTED BOP TEST REQUEST TO AOGCC AT 1400 HRS ON 15 DEC FOR TEST REQUEST OF 2000 HRS ON 16 DEC POST COMPLETE CHANGING OUT BOP COMPONENTS (LOT OF CEMENT DEBRIS IN RAM CAVITIES) POST FINISH INSTALLING BOP DOORS. FINISH SECURING INJECTOR FOR RIG MOVE. INSTALL TREE CAP AND TEST. LEAK TIGHT TEST RESULTS - NO VISIBLE LEAKS. RIG RELEASED 21:30. ALL FURTHER ENTRIES ON WELL 15-16C Printed 12/26/2016 11:14:15AM `All depths reported in Drillers Depths` C -31C Well History (Post -Rig Sidetrack) T/I/O = VAC/0/0. N/D Nordic TS #02. N/U 6" tree cap assembly Torque to API spec., 1010 12/19/2016 ft -lbs, L7 non -coated. PT'd tree cap assmebly (passed). DRIFTED LINER W/41' x 1-3/4" BAILER, TOOLS DEVIATED OUT @ 11,663' SLM.(recovered small metal pieces) RAN 2.5 LIB, S/D ON DEP SLV @ 11273' SLM (11295' MD) +22' CORR. METAL DEBRIS ON DEP SLV FN RAN BAKER RPM LOG, DEV. OUT @ 11661' SLM (11683' MD) .(good data) LOADED TBG W/ 100bbls OF CRUDE. BRUSH 2.70" DEPLOYMENT SLV @ 11,295' MD W/ 2.30" GAUGE RING, 2-7/8" BRUSH WHILE LRS LOADED TBG. RAN 10'x 2.74" DMY WHIP -STOCK, 10'x 2-3/8" PUP JOINT, NORTHERN SOLUTIONS 2.70" RSG STINGER TO 2.70" DEPLOYMENT SLV @ 11,273' SLM / 11,295' MD (tattle 12/22/2016 tail pins sheared). Pumped 3 bbls neat methanol, followed by 14 bbls of crude. Start 10 min injectivty test at 14 bbls. for 10 mins. Injected at .98 to .90 with pressures at 2342 psi to 2364 psi. with 9 12/22/2016 bbls of crude (See log). Slickline to RIH with Brush. Pumped 14 bbls crude down tbg attempting to test LTP. Pumped an additional 16 bbls of crude down tbg and established an LLR of .50 bpm @ 2373 psi. After 2nd plug set/attempted LTP test. Pumped 9 bbls crude to reach test pressure. Pressure fell off 12/23/2016 rapidly. Pumped 9 additional bbls of crude down tbg to establish LLR of .55 @ 2361 psi. SET 3-1/2" NORTHERN SOLUTIONS PACKER W/ 2.70" PTSA W/ 1.781" RXX RSG PLUG IN DEPLOYMENT SLV @ 11;295' MD (w/ Irs assistance) LRS ATTEMPTED TO PRESSURE TEST NORTHERN SOLUTIONS LTP (LLR=.5bpm @ 2400psi) EQUALIZE & PULL 1.781" RXX PLUG FROM 11,272' SLM. SET 3-1/2" LTTP IN NORTHERN SOLUTIONS PACKER @ 11,261' SLM. LRS ATTEMPTED TO PRESSURE TEST NORTHERN SOLUTIONS LTP (LLR=.5bpm @ 2,400psi). PULLED 3-1/2" LTTP FROM NORTHERN SOLUTIONS PACKER @ 11,261' SLM. SET 3-1/2" WHIDDON C -SUB ON 3-1/2" NORTHERN SOLUTIONS PACKER @ 11,261' SLM. 12/23/2016 PULLED ST #2 RK-DGLV FROM 8,601' MD & ST #3 RK-DGLV FROM 5,091' MD. SET ST #2 RK-OGLV @ 8,601' MD. PULLED 3-1/2" WHIDDON C -SUB FROM 11,253' SLM (empty). PULLED 3-1/2" NORTHER SOLUTIONS LTP FROM 11,295' MD (lost both rubber elements) 12/24/2016 RAN 3-1/2" BRUSH W/ 2.64" 3 -PRONG GRAB IN ATTEMPT TO FISH MIRU CTU. Freeze protect flowline with 34 bbls of 60/40 meth. MU 1.75" nozzle to drift for RPM log. WHP at 2600 psi when opened well, pumped 9.8 bbl of 60/40 methanol and 50.6 bbl of KCI to decrease WHP to 762 psi. Pumped 23 bbl 60/40 methanol for freeze protect. Tagged PBTD 13545' CTM with 1.75" Nozzle / POOH At surface STBY for Baker Atlas RPM tools Nordic 2 has them.and will be 12 to 24 hrs. 12/29/2016 Job Objective: RPM Log 12/30/2016 STBY for Baker Atlas RPM logging tools currently Nordic 2 has the tools for 12 to 24 hrs STBY for Baker Atlas RPM logging tools. Calibration of logging tools was not successful. 12/31/2016 Log canceled until further notice. C-31C Well History (Post-Rig Sidetrack) MIRU CTU. Perform Weekly BOP Test. Freeze Protect Flowline with 41.8 bbls of 60/40 Methanol. MU & RIH w/ Baker Atlas RPM Logging Tools. Load well with 1 % KCI for fluid pack and continue pumping to maintain hole fill. Log down at 30 fpm from 10800' to TD 1/11/2017 flag at 13477' and then log up at 20 fpm from 13477' to 10800' Continue logging from TD flag at 13477' up to 10800 at 20fpm while keeping hole full of 1/12/2017 1% KCI. POOH and FP well. RPM has good data. Blowdown reel with N2 RDMO. 1/17/2017 RIG UP HES UNIT 214 TO SET LTP DRIFT TBG W/ 2.70" CENT. & 2.50" LIB TO DEPLOY. SLEEVE AT 11,288' SLM (11,295' MD) (good impression) RAN 35 KB LTP DRIFT W/ DMY STINGER TO DEPLOY SLV AT 11,283' SLM (11,295' MD) LRS LOADED TBG W/ 130 BBLS OF CRUDE SET BAKER 35 KB LTP W/ NORTHERN SOLUTIONS 2.25" PTSA AT 11,285' SLM (TOP OF LTP @ 11280' md) LTP MIN ID = 1.781 R NIPPLE, OAL 18' 1/18/2017 LRS PERFORMED FAILING MIT-T TO 2,400#, LLR OF .22 bpm AT 2,365# (see Irs log) T/1/0=1420/1026/18, Temp=S/I, Assist Slickline with LTP Possitive Pressure Test (Post CTU) Loaded tubing with 2 bbls meth spear followed by 130 bbls crude. Slickline set LTP. Plug failed to set. Pumped 8 bbls of crude to establish a LLR of .22 BPM. Slickline shut down due to negative temps. LRS pump unit released. Slickline on well upon departure. 1/18/2017 FWHP= 1320/1019/19 Valves= slickline. 1/20/2017 COME OFF WEATHER HOLD, DOWNSTACK RISER EQUALIZED & PULLED 1.781" R-LOCK W/ RSG ASSY FROM LTP AT 11,285' SLM SET 1.781" RXX PLUG BODY IN PTSA ASSY AT 11,285' SLM (11,298' md) LRS PERFORM PASSING POSITIVE PRESSURE TEST TO 2400 PSI 1/21/2017 EQUALIZED & PULLED 1.781" RXX PLUG AT 11,285' SLM T/i/O=Vac/1020/18, Temp=S/I, Assist Siickiine with Possitive Pressure test on LTP PASSED to 2177 psi (Assist) Pumped 4.4 bbls crude down tubing to test LTP at a starting pressure of 2360 psi. Possitive pressure test lost 139 psi in 1 st 15 minutes and 44 psi in 2nd 15 minutes for a total loss of 183 psi in 30 minutes using MIT *RP*. Bled down tbg psi 1/21/2017 (-1 bbls). Slickline on well upon departure. FWHP's=500/1020/18. 10000 410 by North America - ALASKA - BP Prudhoe Bay PB C Pad C-31 C-31 C 500292177503 Design: C -31C Final Survey Report 11 January, 2017 Opp --- AA as BAKER HUGHES Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27OGP-Usa AK [4267*15864] Using Well Reference Point Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 [26734*1586, Using geodetic scale factor Fel .9 BAKER HUGHES Site PB C Pad, TR -11-14 BP ;,.�; by Final Survey Report Site Position: Company: North America - ALASKA - BP Local Coordinate Reference: Well C-31 Project: Prudhoe Bay ND Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C -31C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM R5K-Alaska PROD -ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27OGP-Usa AK [4267*15864] Using Well Reference Point Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 [26734*1586, Using geodetic scale factor Fel .9 BAKER HUGHES Site PB C Pad, TR -11-14 Site Position: Northing: 5,957,218.720 usft Latitude: 70° 17'22.367 N From: Map Easting: 662,550.030 usft Longitude: 148° 41'2.797 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.24 ° Well - C-31, C-31 Well Position +N/ -S 0.00 usft Northing: 5,959,422.000 usft Latitude: 70° 17'43.614 N +E/ -W 0.00 usft Easting: 664,508.000 usft Longitude: 148° 40'4.350 W Position Uncertainty 0.00 usft Wellhead Elevation: 37.82 usft Ground Level: 37.32 usft Wellbore C-31 C Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGGM2016 12/1/2016 18.16 81.01 57,558 Design C -31C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 11,319.38 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) 11) 33.08 0.00 0.00 70.00 1/11/2017 8:46:08AM Page 2 COMPASS 5000.1 Build 81B Survey Program From (usft) 50.00 9,987.00 11, 325.00 Survey MD (usft) 33.08 50.00 63.05 76.15 89.15 102.05 115.00 127.80 140.60 153.40 166.20 179.00 191.80 204.40 217.20 230.00 242.80 255.50 268.20 281.00 Date 12/16/2016 To (usft) Survey (Wellbore) 9,944.80 GCT (C-31PB1) 11,319.38 2: MWD - Standard (C -31A) 13,579.66 CTK MWD 3-1/4" (C -31C) BP Final Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Tool Name Description 41, 1 by 1110,",.► Schlumberger GCT multishot MWD MWD - Standard Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C -31C Design: C-31 C Survey Program From (usft) 50.00 9,987.00 11, 325.00 Survey MD (usft) 33.08 50.00 63.05 76.15 89.15 102.05 115.00 127.80 140.60 153.40 166.20 179.00 191.80 204.40 217.20 230.00 242.80 255.50 268.20 281.00 Date 12/16/2016 To (usft) Survey (Wellbore) 9,944.80 GCT (C-31PB1) 11,319.38 2: MWD - Standard (C -31A) 13,579.66 CTK MWD 3-1/4" (C -31C) BP Final Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Tool Name Description GCT -MS Schlumberger GCT multishot MWD MWD - Standard MWD MWD - Standard Well C-31 C-31A/B OKB @ 70.90usft C-31A/B OKB @ 70.90usft True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 BAKER HUGHES HUGHES Inc Azi (azimuth) TVD TVDSS NIS E1W Northing Easting DLeg V. Sec (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 0.00 0.00 33.08 -37.82 0.00 0.00 5,959,422.000 664,508.000 0.00 0.00 0.17 196.21 50.00 -20.90 -0.02 -0.01 5,959,421.976 664,507.994 1.00 -0.01 0.12 170.21 63.05 -7.85 -0.06 -0.01 5,959,421.944 664,507.991 0.62 -0.03 0.12 166.66 76.15 5.25 -0.08 0.00 5,959,421.917 664,507.997 0.06 -0.03 0.10 168.20 89.15 18.25 -0.11 0.00 5,959,421.893 664,508.003 0.16 -0.04 0.10 168.52 102.05 31.15 -0.13 0.01 5,959,421.871 664,508.008 0.00 -0.04 0.08 168.89 115.00 44.10 -0.15 0.01 5,959,421.851 664,508.013 0.15 -0.04 0.07 168.46 127.80 56.90 -0.17 0.01 5,959,421.835 664,508.016 0.08 -0.04 0.07 168.30 140.60 69.70 -0.18 0.02 5,959,421.819 664,508.020 0.00 -0.05 0.08 168.59 153.40 82.50 -0.20 0.02 5,959,421.803 664,508.024 0.08 -0.05 0.12 171.51 166.20 95.30 -0.22 0.02 5,959,421.781 664,508.028 0.31 -0.05 0.13 175.05 179.00 108.10 -0.25 0.03 5,959,421.753 664,508.032 0.10 -0.06 0.13 177.41 191.80 120.90 -0.28 0.03 5,959,421.724 664,508.034 0.04 -0.07 0.13 180.24 204.40 133.50 -0.30 0.03 5,959,421.696 664,508.035 0.05 -0.08 0.13 181.14 217.20 146.30 -0.33 0.03 5,959,421.667 664,508.036 0.02 -0.09 0.12 180.08 230.00 159.10 -0.36 0.03 5,959,421.639 664,508.036 0.08 -0.10 0.12 177.98 242.80 171.90 -0.39 0.03 5,959,421.612 664,508.037 0.03 -0.11 0.12 176.78 255.50 184.60 -0.42 0.03 5,959,421.586 664,508.039 0.02 -0.11 0.08 176.45 268.20 197.30 -0.44 0.03 5,959,421.564 664,508.041 0.31 -0.12 0.05 185.39 281.00 210.10 -0.45 0.03 5,959,421.549 664,508.041 0.25 -0.13 1/11/2017 8:46.08AM Page 3 COMPASS 5000.1 Build 81B BP F/. as pFinal Survey Report BAKER ' HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C -31C Design: C -31C Survey MD Inc Azi (azimuth) TVD TVDSS (usft) (°) (°) (usft) (usft) 293.70 0.02 229.40 293.70 222.80 306.50 0.02 269.75 306.50 235.60 319.30 0.03 290.82 319.30 248.40 332.00 0.05 332.65 332.00 261.10 344.80 0.13 9.26 344.80 273.90 357.50 0.40 17.89 357.50 286.60 370.20 0.78 16.41 370.20 299.30 382.80 1.27 16.21 382.80 311.90 395.30 1.80 16.53 395.29 324.39 407.90 2.35 17.20 407.88 336.98 420.40 2.88 17.82 420.37 349.47 433.00 3.30 18.56 432.95 362.05 445.60 3.53 19.05 445.53 374.63 458.20 3.62 18.97 458.11 387.21 470.80 3.60 18.90 470.68 399.78 483.30 3.58 19.00 483.16 412.26 495.90 3.57 18.90 495.73 424.83 508.50 3.48 18.86 508.31 437.41 521.10 3.35 18.96 520.89 449.99 533.70 3.20 19.05 533.46 462.56 546.30 3.05 19.24 546.05 475.15 558.80 2.88 19.44 558.53 487.63 571.40 2.73 19.66 571.11 500.21 584.00 2.62 19.93 583.70 512.80 596.60 2.48 20.12 596.29 525.39 609.20 2.30 20.03 608.88 537.98 621.70 2.12 19.89 621.37 550.47 Local Coordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Database: NIS E/W Northing (usft) (usft) (usft) -0.46 0.03 5,959,421.542 -0.46 0.02 5,959,421.540 -0.46 0.02 5,959,421.542 -0.45 0.01 5,959,421.548 -0.43 0.01 5,959,421.567 -0.38 0.03 5,959,421.624 -0.25 0.07 5,959,421.749 -0.04 0.13 5,959,421.967 0.29 0.23 5,959,422.290 0.72 0.36 5,959,422.730 1.27 0.53 5,959,423.277 1.91 0.74 5,959,423.927 2.62 0.98 5,959,424.642 3.36 1.24 5,959,425.390 4.11 1.50 5,959,426.146 4.85 1.75 5,959,426.892 5.60 2.01 5,959,427.640 6.33 2.26 5,959,428.378 7.04 2.50 5,959,429.094 7.72 2.74 5,959,429.779 8.37 2.96 5,959,430.433 8.98 3.17 5,959,431.047 9.56 3.38 5,959,431.633 10.11 3.58 5,959,432.190 10.64 3.77 5,959,432.721 11.14 3.95 5,959,433.218 11.59 4.12 5,959,433.675 Well C-31 C-31A/B OKB @ 70.90usft C-31A/B OKB @ 70.90usft True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Easting DLeg V. Sec (usft) (°1100usft) (usft) 664,508.039 0.30 -0.13 664,508.035 0.11 -0.13 664,508.030 0.10 -0.14 664,508.024 0.27 -0.14 664,508.023 0.74 -0.14 664,508.038 2.14 -0.10 664,508.073 2.99 -0.02 664,508.132 3.89 0.11 664,508.219 4.24 0.31 664,508.342 4.37 0.58 664,508.502 4.25 0.93 664,508.700 3.35 1.35 664,508.927 1.84 1.82 664,509.166 0.72 2.32 664,509.407 0.16 2.81 664,509.645 0.17 3.31 664,509.884 0.09 3.80 664,510.118 0.71 4.29 664,510.346 1.03 4.76 664,510.565 1.19 5.21 664,510.776 1.19 5.64 664,510.977 1.36 6.05 664,511.171 1.19 6.45 664,511.358 0.88 6.82 664,511.538 1.11 7.18 664,511.707 1.43 7.52 664,511.862 1.44 7.83 1/11/2017 8:46:08AM Page 4 COMPASS 5000.1 Build 818 by Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C-31 C Design: C-31 C Survey MD (usft) 634.20 646.80 659.40 671.90 684.50 697.10 709.70 722.30 734.90 747.50 760.10 772.70 785.20 797.80 810.30 822.80 835.30 847.90 860.50 873.10 885.70 898.20 910.80 923.30 935.90 948.50 961.00 Inc (1) 1.98 1.87 1.75 1.63 1.55 1.47 1.40 1.33 1.27 1.20 1.13 1.08 1.03 0.97 0.88 0.83 0.78 0.75 0.73 0.68 0.62 0.60 0.55 0.50 0.47 0.45 0.43 Azi (azimuth) 19.70 19.62 19.72 19.57 19.46 19.43 19.56 19.73 19.57 19.73 20.02 20.21 20.26 20.15 19.92 19.61 19.65 19.51 19.29 19.30 19.00 18.56 18.04 17.61 17.40 17.12 16.68 TVD (usft) 633.86 646.45 659.05 671.54 684.14 696.73 709.33 721.92 734.52 747.12 759.72 772.31 784.81 797.41 809.91 822.41 834.90 847.50 860.10 872.70 885.30 897.80 910.40 922.90 935.50 948.10 960.60 BP Final Survey Report TVDSS (usft) 562.96 575.55 588.15 600.64 613.24 625.83 638.43 651.02 663.62 676.22 688.82 701.41 713.91 726.51 739.01 751.51 764.00 776.60 789.20 801.80 814.40 826.90 839.50 852.00 864.60 877.20 889.70 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: NIS EIW Northing (usft) (usft) (usft) 12.01 4.27 5,959,434.099 12.41 4.41 5, 959, 434.500 12.78 4.54 5,959,434.878 13.13 4.67 5,959,435.228 13.46 4.79 5,959,435.560 13.77 4.90 5,959,435.875 14.07 5.00 5,959,436.175 14.35 5.10 5,959,436.459 14.62 5.20 5,959,436.731 14.88 5.29 5,959,436.988 15.12 5.38 5,959,437.231 15.35 5.46 5,959,437.461 15.56 5.54 5,959,437.679 15.77 5.62 5,959,437.887 15.96 5.68 5,959,438.078 16.13 5.75 5,959,438.255 16.30 5.81 5,959,438.421 16.46 5.86 5,959,438.581 16.61 5.92 5,959,438.736 16.76 5.97 5,959,438.883 16.89 6.02 5,959,439.019 17.02 6.06 5,959,439.146 17.14 6.10 5,959,439.267 17.25 6.13 5,959,439.376 17.35 6.17 5,959,439.479 17.45 6.20 5,959,439.576 17.54 6.22 5,959,439.668 ri.I BAKER HUGHES Well C-31 C-31A/B OKB @ 70.90usft C-31A/B OKB @ 70.90usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Easting DLeg V. Sec (usft) (°1100usft) (usft) 664,512.004 1.12 8.12 664,512.138 0.87 8.39 664,512.264 0.95 8.64 664,512.380 0.96 8.88 664,512.489 0.64 9.10 664,512.593 0.63 9.31 664,512.692 0.56 9.51 664,512.786 0.56 9.70 664,512.877 0.48 9.89 664,512.962 0.56 10.06 664,513.044 0.56 10.22 664,513.123 0.40 10.38 664,513.198 0.40 10.53 664,513.269 0.48 10.67 664,513.334 0.72 10.80 664,513.393 0.40 10.92 664,513.449 0.40 11.03 664, 513.501 0.24 11.14 664,513.552 0.16 11.24 664,513.600 0.40 11.34 664,513.644 0.48 11.43 664,513.684 0.16 11.51 664, 513.721 0.40 11.59 664,513.754 0.40 11.66 664,513.784 0.24 11.73 664,513.812 0.16 11.79 664,513.838 0.16 11.85 1/11/2017 8:46:08AM Page 5 COMPASS 5000.1 Build 81B b z _ D 5,044C Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C -31C Design: C-31 C Survey MD (usft) 973.60 986.20 998.70 1,011.30 1,023.80 1,036.40 1,048.90 1,061.50 1,074.10 1,086.70 1,099.20 1,111.80 1,124.40 1,136.80 1,149.20 1,161.50 1,173.90 1,186.20 1,198.60 1,210.90 1,223.30 1,235.70 1,248.00 1,260.40 1,272.80 1,285.20 1,297.50 BP Final Survey Report Inc Azi (azimuth) ND TVDSS N/S (1) V) (usft) (usft) (usft) 0.40 16.45 973.20 902.30 17.63 0.37 16.23 985.80 914.90 17.71 0.37 14.59 998.30 927.40 17.78 0.37 12.31 1,010.90 940.00 17.86 0.38 11.52 1,023.40 952.50 17.94 0.38 11.71 1,036.00 965.10 18.03 0.37 11.21 1,048.50 977.60 18.11 0.38 10.66 1,061.10 990.20 18.19 0.38 10.75 1,073.70 1,002.80 18.27 0.37 10.53 1,086.29 1,015.39 18.35 0.35 8.52 1,098.79 1,027.89 18.43 0.33 6.05 1,111.39 1,040.49 18.50 0.32 5.68 1,123.99 1,053.09 18.57 0.28 4.44 1,136.39 1,065.49 18.64 0.27 3.35 1,148.79 1,077.89 18.70 0.25 3.14 1,161.09 1,090.19 18.75 0.22 1.55 1,173.49 1,102.59 18.80 0.18 1.94 1,185.79 1,114.89 18.85 0.23 33.57 1,198.19 1,127.29 18.89 0.62 80.20 1,210.49 1,139.59 18.92 1.35 101.40 1,222.89 1,151.99 18.90 2.13 107.27 1,235.29 1,164.39 18.80 2.90 109.45 1,247.57 1,176.67 18.63 3.75 110.32 1,259.95 1,189.05 18.39 4.47 110.29 1,272.32 1,201.42 18.08 4.95 109.74 1,284.68 1,213.78 17.73 5.35 106.87 1,296.93 1,226.03 17.37 Local Coordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Database: E/W Northing (usft) (usft) 6.25 5,959,439.757 6.27 5,959,439.838 6.29 5,959,439.916 6.31 5,959,439.996 6.33 5,959,440.076 6.35 5,959,440.159 6.36 5,959,440.239 6.38 5,959,440.320 6.39 5,959,440.403 6.41 5,959,440.484 6.42 5,959,440.562 6.43 5,959,440.636 6.44 5,959,440.707 6.45 5,959,440.772 6.45 5,959,440.832 6.45 5,959,440.887 6.45 5,959,440.938 6.46 5,959,440.981 6.47 5,959,441.022 6.55 5,959,441.055 6.76 5,959,441.042 7.12 5,959,440.953 7.63 5,959,440.793 8.31 5,959,440.563 9.14 5,959,440.273 10.10 5,959,439.945 11.14 5,959,439.604 Well C-31 C-31A/B OKB @ 70.90usft C-31A/B OKB @ 70.90usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Easting DLeg (usft) (°/100usft) 664,513.862 0.24 664,513.884 0.24 664,513.903 0.08 664,513.921 0.12 664,513.936 0.09 664,513.951 0.01 664,513.965 0.08 664,513.979 0.08 664,513.993 0.00 664,514.006 0.08 664,514.018 0.19 664,514.026 0.20 664,514.031 0.08 664,514.036 0.33 664,514.038 0.09 664,514.040 0.16 664, 514.041 0.25 664,514.042 0.33 664,514.055 0.98 664,514.134 3.99 664,514.343 6.48 664,514.709 6.44 664,515.224 6.31 664,515.905 6.87 664,516.745 5.81 664,517.709 3.89 664,518.759 3.31 reA.a BAKER HUGHES V. Sec (usft) 11.90 11.95 12.00 12.04 12.09 12.13 12.17 12.21 12.26 12.30 12.34 12.37 12.40 12.43 12.46 12.48 12.50 12.51 12.54 12.63 12.82 13.12 13.55 14.10 14.78 15.56 16.41 1/11/2017 8:46:08AM Page 6 COMPASS 5000.1 Build 818 MD (usft) 1,309.90 1,322.30 1,334.70 1,347.00 1,359.40 1,371.80 1,384.10 1,396.50 1,408.90 1,421.30 1,433.70 1,446.00 1,458.40 1,470.80 1,483.20 1,495.60 1, 5 08. 00 1,520.30 1,532.70 1,545.10 1,557.60 1,570.00 1,582.40 1,594.80 1,607.20 1,619.60 1,632.00 BP iias Final Survey Report BAKER HUGHES Local Coordinate Reference: Well C-31 TVD Reference: C-31A/B OKB @ 70.90usft MD Reference: C-31A/B OKB @ 70.90usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Inc Azi (azimuth) 4.•.% b TVDSS Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C-31 C Design: C-31C Survey (usft) MD (usft) 1,309.90 1,322.30 1,334.70 1,347.00 1,359.40 1,371.80 1,384.10 1,396.50 1,408.90 1,421.30 1,433.70 1,446.00 1,458.40 1,470.80 1,483.20 1,495.60 1, 5 08. 00 1,520.30 1,532.70 1,545.10 1,557.60 1,570.00 1,582.40 1,594.80 1,607.20 1,619.60 1,632.00 BP iias Final Survey Report BAKER HUGHES Local Coordinate Reference: Well C-31 TVD Reference: C-31A/B OKB @ 70.90usft MD Reference: C-31A/B OKB @ 70.90usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 5.73 107.89 1,309.27 1,238.37 16.99 12.28 5,959,439.251 664,519.903 3.16 17.35 6.13 106.81 1,321.60 1,250.70 16.61 13.50 5,959,438.897 664,521.134 3.35 18.37 6.52 105.64 1,333.93 1,263.03 16.23 14.81 5,959,438.544 664,522.453 3.31 19.47 6.90 104.37 1,346.14 1,275.24 15.85 16.20 5,959,438.203 664,523.849 3.32 20.65 7.28 103.07 1,358.45 1,287.55 15.49 17.69 5,959,437.873 664,525.344 3.33 21.92 7.67 101.89 1,370.74 1,299.84 15.14 19.26 5,959,437.560 664,526.926 3.38 23.28 8.05 100.90 1,382.93 1,312.03 14.81 20.91 5,959,437.264 664,528.582 3.28 24.72 8.45 100.07 1,395.20 1,324.30 14.49 22.66 5,959,436.979 664,530.338 3.37 26.25 8.83 99.38 1,407.46 1,336.56 14.17 24.50 5,959,436.705 664,532.180 3.18 27.87 9.15 98.80 1,419.71 1,348.81 13.87 26.41 5,959,436.441 664,534.099 2.68 29.56 9.37 98.38 1,431.95 1,361.05 13.57 28.38 5,959,436.186 664,536.078 1.86 31.31 9.45 98.24 1,444.08 1,373.18 13.28 30.37 5,959,435.939 664,538.074 0.68 33.08 9.48 98.29 1,456.31 1,385.41 12.99 32.39 5,959,435.690 664,540.098 0.25 34.88 9.45 98.25 1,468.54 1,397.64 12.69 34.41 5,959,435.441 664,542.121 0.25 36.68 9.35 98.23 1,480.78 1,409.88 12.40 36.41 5,959,435.195 664,544.131 0.81 38.46 9.17 98.36 1,493.01 1,422.11 12.11 38.39 5,959,434.950 664,546.112 1.46 40.22 8.97 98.55 1,505.26 1,434.36 11.83 40.32 5,959,434.705 664,548.051 1.63 41.94 8.80 98.79 1,517.41 1,446.51 11.54 42.20 5,959,434.460 664,549.935 1.41 43.60 8.68 98.92 1,529.67 1,458.77 11.25 44.06 5,959,434.211 664,551.802 0.98 45.25 8.63 98.79 1,541.93 1,471.03 10.96 45.91 5,959,433.964 664,553.652 0.43 46.89 8.58 96.38 1,554.29 1,483.39 10.68 47.75 5,959,433.725 664,555.506 0.63 48.53 8.58 97.51 1,566.55 1,495.65 10.43 49.59 5,959,433.510 664,557.344 1.05 50.16 8.67 96.21 1,578.81 1,507.91 10.21 51.43 5,959,433.328 664,559.194 1.73 51.82 8.77 94.67 1,591.06 1,520.16 10.03 53.30 5,959,433.191 664,561.069 2.05 53.52 8.87 92.91 1,603.32 1,532.42 9.90 55.20 5,959,433.107 664,562.968 2.32 55.26 8.98 90.83 1,615.57 1,544.67 9.84 57.12 5,959,433.087 664,564.891 2.75 57.04 9.13 88.32 1,627.81 1,556.91 9.85 59.07 5,959,433.144 664,566.841 3.41 58.88 1/11/2017 8:46:08AM Page 7 COMPASS 5000.1 Build 81B ', B P F01 as .41 O; by Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Coordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C -31C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°l1oousft) (usft) 1,644.40 9.33 85.53 1,640.05 1,569.15 9.96 61.06 5,959,433.295 664,568.824 3.95 60.79 1,656.80 9.58 83.06 1,652.28 1,581.38 10.16 63.09 5,959,433.542 664,570.845 3.84 62.76 1,669.20 9.95 81.40 1,664.50 1,593.60 10.45 65.17 5,959,433.873 664,572.921 3.75 64.81 1,681.60 10.38 80.44 1,676.71 1,605.81 10.80 67.33 5,959,434.266 664,575.074 3.73 66.96 1,693.40 10.82 79.97 1,688.31 1,617.41 11.16 69.47 5,959,434.682 664,577.204 3.80 69.10 1,696.70 10.92 79.95 1,691.55 1,620.65 11.27 70.08 5,959,434.804 664,577.814 3.03 69.71 1,722.60 11.20 80.24 1,716.97 1,646.07 12.13 74.98 5,959,435.765 664,582.689 1.10 74.60 1,763.90 10.78 82.32 1,757.51 1,686.61 13.32 82.76 5,959,437.131 664,590.441 1.40 82.32 1,805.10 10.25 86.30 1,798.02 1,727.12 14.08 90.23 5,959,438.046 664,597.899 2.18 89.61 1,846.30 9.95 90.00 1,838.58 1,767.68 14.31 97.45 5,959,438.440 664,605.109 1.73 96.47 1,887.20 10.08 92.39 1,878.86 1,807.96 14.16 104.56 5,959,438.447 664,612.220 1.06 103.10 1,927.50 10.83 93.82 1,918.49 1,847.59 13.76 111.86 5,959,438.207 664,619.528 1.97 109.82 1,967.60 11.97 95.25 1,957.80 1,886.90 13.13 119.76 5,959,437.749 664,627.439 2.93 117.03 2,007.60 13.03 96.80 1,996.85 1,925.95 12.22 128.37 5,959,437.024 664,636.065 2.78 124.81 2,047.50 13.87 97.90 2,035.65 1,964.75 11.03 137.58 5,959,436.036 664,645.291 2.20 133.05 2,087.40 14.88 98.49 2,074.30 2,003.40 9.61 147.38 5,959,434.837 664,655.124 2.56 141.78 2,127.40 16.27 98.55 2,112.83 2,041.93 8.02 158.00 5,959,433.479 664,665.776 3.48 151.22 2,167.40 17.85 98.23 2,151.07 2,080.17 6.31 169.61 5,959,432.023 664,677.419 3.96 161.54 2,207.30 19.47 97.82 2,188.87 2,117.97 4.53 182.25 5,959,430.520 664,690.095 4.07 172.81 2,247.20 20.83 97.47 2,226.33 2,155.43 2.71 195.87 5,959,428.991 664,703.753 3.42 184.99 2,287.10 22.00 97.28 2,263.48 2,192.58 0.84 210.32 5,959,427.439 664,718.237 2.94 197.92 2,327.00 23.13 97.11 2,300.32 2,229.42 -1.08 225.51 5,959,425.855 664,733.465 2.84 211.54 2,366.90 24.42 97.00 2,336.83 2,265.93 -3.06 241.47 5,959,424.230 664,749.466 3.23 225.87 2,406.80 25.93 96.88 2,372.94 2,302.04 -5.11 258.32 5,959,422.549 664,766.354 3.79 241.00 2,446.80 27.53 96.70 2,408.67 2,337.77 -7.23 276.19 5,959,420.814 664,784.260 4.01 257.06 2,486.70 29.05 96.41 2,443.80 2,372.90 -9.39 294.97 5,959,419.068 664,803.087 3.83 273.97 2,526.60 30.33 95.85 2,478.46 2,407.56 -11.50 314.62 5,959,417.391 664,822.777 3.28 291.72 1/11/2017 8:46:08AM Page 8 COMPASS 5000.1 Build 81B BP FS as %,: Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C-31 C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 2,566.50 31.72 95.10 2,512.65 2,441.75 -13.46 335.09 5,959,415.880 664,843.284 3.62 310.28 2,606.40 33.35 94.48 2,546.29 2,475.39 -15.25 356.48 5,959,414.559 664,864.699 4.17 329.76 2,645.90 34.95 93.91 2,5713.98 2,508.08 -16.87 378.59 5,959,413.424 664,886.842 4.13 349.99 2,685.20 36.47 93.14 2,610.89 2,539.99 -18.27 401.48 5,959,412.518 664,909.760 4.03 371.02 2,724.80 37.92 92.47 2,642.43 2,571.53 -19.44 425.39 5,959,411.873 664,933.688 3.80 393.09 2,766.10 39.50 91.94 2,674.66 2,603.76 -20.44 451.20 5,959,411.446 664,959.510 3.91 417.00 2,807.60 40.20 91.57 2,706.52 2,635.62 -21.25 477.78 5,959,411.214 664,986.099 1.78 441.70 2,828.12 40.18 91.60 2,722.20 2,651.30 -21.62 491.02 5,959,411.138 664,999.339 0.15 454.01 13 318" 2,849.10 40.15 91.63 2,738.23 2,667.33 -22.00 504.54 5,959,411.053 665,012.869 0.15 466.59 2,890.70 40.02 91.82 2,770.06 2,699.16 -22.80 531.32 5,959,410.833 665,039.654 0.43 491.48 2,932.20 39.90 91.96 2,801.87 2,730.97 -23.68 557.96 5,959,410.537 665,066.304 0.36 516.21 2,973.90 40.18 92.30 2,833.79 2,762.89 -24.68 584.77 5,959,410.127 665,093.125 0.85 541.06 3,015.60 40.73 92.97 2,865.52 2,794.62 -25.92 611.79 5,959,409.474 665,120.172 1.68 566.03 3,057.40 41.23 94.30 2,897.08 2,826.18 -27.66 639.15 5,959,408.334 665,147.557 2.41 591.14 3,099.00 41.78 96.31 2,928.23 2,857.33 -30.21 666.60 5,959,406.384 665,175.051 3.46 616.06 3,140.50 42.85 97.65 2,958.92 2,888.02 -33.61 694.32 5,959,403.594 665,202.846 3.37 640.96 3,181.90 44.22 97.68 2,988.93 2,918.03 -37.42 722.59 5,959,400.410 665,231.181 3.31 666.21 3,223.50 45.40 97.22 3,018.45 2,947.55 -41.22 751.65 5,959,397.247 665,260.325 2.94 692.23 3,265.20 45.93 96.89 3,047.59 2,976.69 -44.88 781.26 5,959,394.233 665,289.997 1.39 718.79 3,307.00 46.07 96.88 3,076.62 3,005.72 -48.48 811.11 5,959,391.283 665,319.918 0.34 745.61 3,348.70 46.28 96.96 3,105.50 3,034.60 -52.11 840.97 5,959,388.313 665,349.854 0.52 772.43 3,389.90 46.35 97.00 3,133.96 3,063.06 -55.73 870.55 5,959,385.341 665,379.497 0.18 798.98 3,431.00 46.38 97.04 3,162.32 3,091.42 -59.36 900.07 5,959,382.353 665,409.090 0.10 825.48 3,472.10 46.38 97.04 3,190.67 3,119.77 -63.01 929.60 5,959,379.353 665,438.690 0.00 851.99 3,513.20 46.45 97.06 3,219.01 3,148.11 -66.67 959.14 5,959,376.347 665,468.307 0.17 878.50 3,554.20 46.57 97.13 3,247.23 3,176.33 -70.34 988.66 5,959,373.320 665,497.895 0.32 904.98 1111/2017 8:46:08AM Page 9 COMPASS 5000.1 Build 81B '0 b . Z p AFOOW Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C-31 C Design: C-31 C Survey MD (usft) 3,595.30 3,636.40 3,677.50 3,718.60 3,759.70 3,800.80 3,841.80 3,882.80 3,923.90 3,965.00 4,006.00 4,047.20 4,088.00 4,128.30 4,168.70 4,209.20 4,249.70 4,290.00 4,330.50 4,370.90 4,411.40 4,451.80 4,492.30 4,532.80 4,573.30 4,613.80 4,654.40 BP I/.as Final Survey Report ND BAKER N/S HUGHES Local Co-ordinate Reference: Well C-31 Easting ND Reference: C-31A/B OKB @ 70.90usft V. Sec MD Reference: C-31A/B OKB @ 70.90usft North Reference: True (usft) Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Inc Azi (azimuth) ND TVDSS N/S EIW Northing Easting DLeg V. Sec (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 46.57 97.18 3,275.48 3,204.58 -74.06 1,018.28 5,959,370.252 665,527.583 0.09 931.54 46.60 97.19 3,303.73 3,232.83 -77.79 1,047.90 5,959,367.167 665,557.276 0.08 958.09 46.73 97.21 3,331.93 3,261.03 -81.54 1,077.56 5,959,364.071 665,587.007 0.32 984.68 46.68 97.25 3,360.12 3,289.22 -85.30 1,107.23 5,959,360.957 665,616.756 0.14 1,011.28 46.78 97.27 3,388.29 3,317.39 -89.08 1,136.92 5,959,357.826 665,646.516 0.25 1,037.88 46.93 97.30 3,416.39 3,345.49 -92.89 1,166.66 5,959,354.675 665,676.336 0.37 1,064.54 46.85 97.39 3,444.41 3,373.51 -96.71 1,196.35 5,959,351.500 665,706.097 0.25 1,091.12 46.95 97.50 3,472.43 3,401.53 -100.59 1,226.03 5,959,348.272 665,735.857 0.31 1,117.69 47.13 97.57 3,500.44 3,429.54 -104.54 1,255.85 5,959,344.981 665,765.752 0.46 1,144.36 47.22 97.68 3,528.38 3,457.48 -108.54 1,285.73 5,959,341.637 665,795.708 0.29 1,171.07 47.45 97.73 3,556.16 3,485.26 -112.58 1,315.61 5,959,338.250 665,825.663 0.57 1,197.76 47.77 97.76 3,583.94 3,513.04 -116.68 1,345.76 5,959,334.810 665,855.895 0.78 1,224.69 47.82 97.83 3,611.35 3,540.45 -120.78 1,375.70 5,959,331.368 665,885.919 0.18 1,251.43 47.62 97.88 3,638.46 3,567.56 -124.85 1,405.24 5,959,327.940 665,915.536 0.50 1,277.79 47.87 97.92 3,665.62 3,594.72 -128.96 1,434.86 5,959,324.480 665,945.235 0.62 1,304.22 48.05 97.90 3,692.75 3,621.85 -133.10 1,464.65 5,959,320.994 665,975.109 0.45 1,330.80 47.85 97.86 3,719.87 3,648.97 -137.23 1,494.44 5,959,317.524 666,004.980 0.50 1,357.38 48.05 97.89 3,746.86 3,675.96 -141.33 1,524.08 5,959,314.074 666,034.703 0.50 1,383.83 48.30 97.93 3,773.87 3,702.97 -145.48 1,553.97 5,959,310.576 666,064.678 0.62 1,410.50 48.53 97.94 3,800.69 3,729.79 -149.65 1,583.90 5,959,307.061 666,094.689 0.57 1,437.20 48.58 97.93 3,827.49 3,756.59 -153.84 1,613.97 5,959,303.529 666,124.839 0.12 1,464.02 48.60 97.91 3,854.22 3,783.32 -158.02 1,643.98 5,959,300.012 666,154.932 0.06 1,490.79 48.75 97.92 3,880.96 3,810.06 -162.21 1,674.11 5,959,296.485 666,185.139 0.37 1,517.67 48.87 97.94 3,907.63 3,836.73 -166.41 1,704.29 5,959,292.942 666,215.408 0.30 1,544.59 49.17 97.97 3,934.19 3,863.29 -170.64 1,734.57 5,959,289.375 666,245.772 0.74 1,571.60 49.50 97.96 3,960.58 3,889.68 -174.90 1,765.00 5,959,285.785 666,276.280 0.82 1,598.74 49.73 97.93 3,986.89 3,915.99 -179.17 1,795.63 5,959,282.182 666,306.992 0.57 1,626.06 1/11/2017 8:46:08AM Page 10 COMPASS 5000.1 Build 818 BP FESas oowp by Final Survey Report HUGHES Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C -31C Design: C-31 C Survey MD (usft) 4,695.00 4,735.60 4,776.00 4,815.60 4,855.10 4,894.80 4,934.60 4,974.50 5,014.30 5,054.00 5,093.80 5,133.70 5,173.50 5,213.30 5,253.10 5,293.00 5,332.80 5,372.60 5,412.50 5,452.30 5,491.80 5,530.90 5,570.10 5,609.40 5,648.50 5,687.70 5,726.90 Local Coordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well C-31 C-31A/B OKB @ 70.90usft C-31A/B OKB @ 70.90usft True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Inc Azi (azimuth) ND TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 49.58 97.93 4,013.17 3,942.27 -183.44 1,826.27 5,959,278.585 666,337.724 0.37 1,653.39 49.32 97.91 4,039.57 3,968.67 -187.69 1,856.83 5,959,275.004 666,368.363 0.64 1,680.65 49.10 97.94 4,065.96 3,995.06 -191.91 1,887.12 5,959,271.451 666,398.741 0.55 1,707.68 48.90 98.00 4,091.94 4,021.04 -196.05 1,916.72 5,959,267.956 666,428.420 0.52 1,734.07 49.00 97.96 4,117.88 4,046.98 -200.19 1,946.22 5,959,264.468 666,458.001 0.26 1,760.38 49.27 97.82 4,143.85 4,072.95 -204.31 1,975.96 5,959,260.999 666,487.821 0.73 1,786.92 49.57 97.66 4,169.74 4,098.84 -208.38 2,005.91 5,959,257.585 666,517.854 0.81 1,813.67 49.65 97.50 4,195.60 4,124.70 -212.39 2,036.04 5,959,254.237 666,548.057 0.37 1,840.61 49.53 97.29 4,221.40 4,150.50 -216.29 2,066.09 5,959,250.995 666,578.185 0.50 1,867.51 49.48 97.11 4,247.18 4,176.28 -220.07 2,096.04 5,959,247.868 666,608.211 0.37 1,894.37 49.50 96.97 4,273.03 4,202.13 -223.78 2,126.07 5,959,244.817 666,638.315 0.27 1,921.32 49.60 96.83 4,298.92 4,228.02 -227.43 2,156.22 5,959,241.831 666,668.528 0.37 1,948.39 49.75 96.70 4,324.67 4,253.77 -231.01 2,186.35 5,959,238.917 666,698.729 0.45 1,975.49 49.77 96.61 4,350.38 4,279.48 -234.53 2,216.52 5,959,236.058 666,728.973 0.18 2,002.64 49.85 96.53 4,376.07 4,305.17 -238.00 2,246.73 5,959,233.241 666,759.243 0.25 2,029.83 49.95 96.44 4,401.77 4,330.87 -241.45 2,277.05 5,959,230.459 666,789.635 0.30 2,057.15 49.90 96.35 4,427.39 4,356.49 -244.84 2,307.32 5,959,227.730 666,819.965 0.21 2,084.43 49.85 96.29 4,453.04 4,382.14 -248.19 2,337.57 5,959,225.043 666,850.277 0.17 2,111.71 49.97 96.26 4,478.74 4,407.84 -251.53 2,367.91 5,959,222.372 666,880.682 0.31 2,139.08 50.03 96.23 4,504.32 4,433.42 -254.85 2,398.22 5,959,219.720 666,911.053 0.16 2,166.42 49.87 96.23 4,529.74 4,458.84 -258.13 2,428.27 5,959,217.097 666,941.174 0.41 2,193.55 49.82 96.28 4,554.95 4,484.05 -261.38 2,457.98 5,959,214.492 666,970.942 0.16 2,220.35 49.87 96.34 4,580.23 4,509.33 -264.68 2,487.76 5,959,211.852 667,000.784 0.17 2,247.20 49.78 96.44 4,605.58 4,534.68 -268.02 2,517.60 5,959,209.164 667,030.690 0.30 2,274.10 49.82 96.57 4,630.82 4,559.92 -271.40 2,547.27 5,959,206.431 667,060.427 0.27 2,300.83 50.03 96.65 4,656.06 4,585.16 -274.86 2,577.07 5,959,203.632 667,090.290 0.56 2,327.65 50.22 96.74 4,661.19 4,610.29 -278.36 2,606.95 5,959,200.779 667,120.236 0.52 2,354.52 1/11/2017 8:46:08AM Page 11 COMPASS 5000.1 Build 81B .�•� BF, FSas b Imo: p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKS @ 70.90usft Well: C-31 North Reference: True Wellbore: C-31 C Survey Calculation Method: Minimum Curvature Design: C-31 C Database: EDM R5K - Alaska PROD - ANCP1 Survey - - - - MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft (usft) 5,766.20 50.25 96.79 4,706.33 4,635.43 -281.92 2,636.95 5,959,197.879 667,150.303 0.12 2,381.50 5,805.40 50.33 96.78 4,731.37 4,660.47 -285.48 2,666.89 5,959,194.972 667,180.317 0.21 2,408.42 5,844.70 50.52 96.78 4,756.41 4,685.51 -289.06 2,696.97 5,959,192.055 667,210.466 0.48 2,435.46 5,883.70 50.43 96.82 4,781.23 4,710.33 -292.62 2,726.84 5,959,189.148 667,240.406 0.24 2,462.31 5,922.60 50.30 96.96 4,806.04 4,735.14 -296.22 2,756.58 5,959,186.207 667,270.216 0.43 2,489.03 5,961.60 50.30 97.06 4,830.95 4,760.05 -299.88 2,786.37 5,959,183.198 667,300.070 0.20 2,515.76 6,000.80 50.35 97.00 4,855.98 4,785.08 -303.57 2,816.31 5,959,180.161 667,330.066 0.17 2,542.64 6,039.90 50.48 96.94 4,880.90 4,810.00 -307.23 2,846.22 5,959,177.161 667,360.068 0.35 2,569.50 6,079.20 50.68 96.93 4,905.85 4,834.95 -310.89 2,876.36 5,959,174.156 667,390.276 0.51 2,596.56 6,118.50 50.95 96.97 4,930.68 4,859.78 -314.58 2,906.60 5,959,171.132 667,420.585 0.69 2,623.72 6,157.80 51.13 97.05 4,955.39 4,884.49 -318.31 2,936.93 5,959,168.068 667,450.988 0.48 2,650.94 6,196.40 51.20 97.13 4,979.60 4,908.70 -322.02 2,966.77 5,959,165.011 667,480.898 0.24 2,677.71 6,235.00 51.17 97.28 5,003.79 4,932.89 -325.79 2,996.60 5,959,161.893 667,510.810 0.31 2,704.46 6,273.40 50.68 97.51 5,028.00 4,957.10 -329.63 3,026.17 5,959,158.704 667,540.447 1.36 2,730.93 6,311.50 50.32 97.74 5,052.23 4,981.33 -333.53 3,055.31 5,959,155.443 667,569.663 1.05 2,756.98 6,349.80 50.30 97.86 5,076.69 5,005.79 -337.53 3,084.51 5,959,152.083 667,598.941 0.25 2,783.05 6,388.30 50.40 97.91 5,101.26 5,030.36 -341.60 3,113.87 5,959,148.660 667,628.384 0.28 2,809.25 6,426.80 50.57 98.02 5,125.76 5,054.86 -345.71 3,143.28 5,959,145.190 667,657.879 0.49 2,835.48 6,465.30 50.77 98.19 5,150.16 5,079.26 -349.91 3,172.77 5,959,141.638 667,687.445 0.62 2,861.75 6,503.80 51.08 98.33 5,174.42 5,103.52 -354.20 3,202.34 5,959,137.992 667,717.108 0.85 2,888.07 6,542.30 51.23 98.35 5,198.57 5,127.67 -358.55 3,232.01 5,959,134.294 667,746.862 0.39 2,914.47 6,580.70 51.20 98.22 5,222.63 5,151.73 -362.87 3,261.63 5,959,130.630 667,776.568 0.28 2,940.83 6,619.10 51.25 98.18 5,246.67 5,175.77 -367.14 3,291.26 5,959,127.010 667,806.283 0.15 2,967.21 6,657.60 51.32 98.28 5,270.75 5,199.85 -371.44 3,321.00 5,959,123.362 667,836.099 0.27 2,993.68 6,696.10 51.23 98.31 5,294.84 5,223.94 -375.77 3,350.72 5,959,119.680 667,865.907 0.24 3,020.12 6,734.60 50.97 98.39 5,319.02 5,248.12 -380.12 3,380.36 5,959,115.979 667,895.637 0.69 3,046.49 6,773.10 50.60 98.49 5,343.36 5,272.46 -384.50 3,409.87 5,959,112.248 667,925.230 0.98 3,072.72 1/11/2017 8:46:08AM Page 12 COMPASS 5000.1 Build 81B ,rw by as 40, Z '0 ' Final SuBe Report BAKER HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C -31C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) ND TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 6,811.60 50.30 98.49 5,367.87 5,296.97 -388.88 3,439.23 5,959,108.510 667,954.678 0.78 3,098.81 6,849.70 50.05 98.26 5,392.27 5,321.37 -393.14 3,468.18 5,959,104.883 667,983.711 0.80 3,124.56 6,887.60 49.93 98.08 5,416.64 5,345.74 -397.27 3,496.91 5,959,101.387 668,012.527 0.48 3,150.15 6,925.50 49.93 98.09 5,441.04 5,370.14 -401.35 3,525.63 5,959,097.938 668,041.322 0.02 3,175.74 6,963.30 49.97 98.16 5,465.36 5,394.46 -405.44 3,554.27 5,959,094.477 668,070.047 0.18 3,201.25 7,001.20 49.88 98.18 5,489.76 5,418.86 -409.56 3,582.98 5,959,090.985 668,098.836 0.24 3,226.82 7,039.00 49.53 98.25 5,514.20 5,443.30 -413.68 3,611.51 5,959,087.491 668,127.452 0.94 3,252.23 7,076.90 49.15 98.43 5,538.90 5,468.00 -417.85 3,639.96 5,959,083.945 668,155.981 1.07 3,277.53 7,114.70 48.93 98.52 5,563.68 5,492.78 -422.06 3,668.19 5,959,080.357 668,184.298 0.61 3,302.62 7,152.70 48.83 98.50 5,588.67 5,517.77 -426.29 3,696.51 5,959,076.742 668,212.693 0.27 3,327.78 7,190.50 46.72 98.47 5,613.58 5,542.68 -430.49 3,724.62 5,959,073.164 668,240.896 0.30 3,352.77 7,228.40 48.57 98.47 5,638.62 5,567.72 -434.68 3,752.76 5,959,069.591 668,269.117 0.40 3,377.78 7,266.40 48.40 98.36 5,663.81 5,592.91 -438.84 3,780.91 5,959,066.044 668,297.347 0.50 3,402.80 7,304.30 48.28 98.21 5,689.00 5,618.10 -442.92 3,808.93 5,959,062.578 668,325.447 0.43 3,427.74 7,342.20 48.13 98.02 5,714.26 5,643.36 -446.91 3,836.90 5,959,059.203 668,353.499 0.54 3,452.66 7,380.20 47.95 97.90 5,739.67 5,668.77 -450.82 3,864.89 5,959,055.904 668,381.561 0.53 3,477.62 7,418.10 47.83 97.90 5,765.08 5,694.18 -454.69 3,892.74 5,959,052.650 668,409.486 0.32 3,502.46 7,456.00 47.83 97.92 5,790.52 5,719.62 -458.55 3,920.56 5,959,049.394 668,437.385 0.04 3,527.29 7,493.90 47.76 97.96 5,815.96 5,745.08 -462.43 3,948.37 5,959,046.125 668,465.271 0.15 3,552.09 7,531.10 47.90 97.98 5,840.95 5,770.05 -466.26 3,975.68 5,959,042.901 668,492.655 0.33 3,576.45 7,568.10 47.95 98.00 5,865.74 5,794.84 -470.07 4,002.88 5,959,039.680 668,519.928 0.14 3,600.70 7,604.90 47.80 98.01 5,890.43 5,819.53 -473.87 4,029.90 5,959,036.472 668,547.030 0.41 3,624.80 7,642.00 47.78 98.05 5,915.35 5,844.45 -477.71 4,057.11 5,959,033.230 668,574.316 0.10 3,649.05 7,679.20 47.77 98.09 5,940.35 5,869.45 -481.58 4,084.39 5,959,029.961 668,601.667 0.08 3,673.36 7,716.30 47.92 98.15 5,965.25 5,894.35 -485.46 4,111.62 5,959,026.673 668,628.971 0.42 3,697.62 7,753.40 47.98 98.25 5,990.10 5,919.20 -489.39 4,138.88 5,959,023.342 668,656.316 0.26 3,721.90 7,790.50 47.75 98.27 6,014.99 5,944.09 -493.35 4,166.11 5,959,019.986 668,683.621 0.62 3,746.13 1/11/2017 8:46:08AM Page 13 COMPASS 5000.1 Build 81B +00 20 BP FIA FA I -b�} �,♦�; 1" Final Survey Report BAKER HUGHES Company: North America -ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay ND Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C-31 C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 7,827.70 47.75 98.33 6,040.00 5,969.10 -497.32 4,193.36 5,959,016.609 668,710.947 0.12 3,770.37 7,864.80 47.90 98.41 6,064.91 5,994.01 -501.32 4,220.56 5,959,013.203 668,738.228 0.43 3,794.57 7,902.00 47.87 98.44 6,089.86 6,018.96 -505.37 4,247.86 5,959,009.759 668,765.605 0.10 3,818.83 7,939.10 47.78 98.48 6,114.77 6,043.87 -509.41 4,275.05 5,959,006.310 668,792.881 0.26 3,843.01 7,976.20 47.73 98.59 6,139.71 6,068.81 -513.49 4,302.21 5,959,002.830 668,820.122 0.26 3,867.13 8,013.29 47.77 98.69 6,164.65 6,093.75 -517.61 4,329.36 5,958,999.301 668,847.347 0.23 3,891.23 8,050.50 47.82 98.74 6,189.64 6,118.74 -521.79 4,356.60 5,958,995.722 668,874.675 0.17 3,915.40 8,087.70 47.77 98.78 6,214.63 6,143.73 -525.98 4,383.83 5,958,992.123 668,901.992 0.16 3,939.56 8,124.80 47.58 98.83 6,239.61 6,168.71 -530.18 4,410.94 5,958,988.519 668,929.182 0.52 3,963.59 8,161.50 47.38 98.86 6,264.42 6,193.52 -534.34 4,437.67 5,958,984.946 668,955.993 0.55 3,987.29 8,198.10 47.28 98.86 6,289.23 6,218.33 -538.49 4,464.26 5,958,981.384 668,982.665 0.27 4,010.86 8,234.60 47.10 98.83 6,314.03 6,243.13 -542.60 4,490.72 5,958,977.847 669,009.205 0.50 4,034.31 8,271.10 46.88 98.82 6,338.93 6,268.03 -546.70 4,517.09 5,958,974.331 669,035.661 0.60 4,057.69 8,307.70 46.68 98.88 6,363.99 6,293.09 -550.80 4,543.44 5,958,970.806 669,062.096 0.56 4,081.06 8,344.10 46.38 98.95 6,389.03 6,318.13 -554.90 4,569.54 5,958,967.284 669,088.275 0.84 4,104.18 8,380.60 46.12 99.01 6,414.27 6,343.37 -559.01 4,595.59 5,958,963.740 669,114.400 0.72 4,127.24 8,417.20 45.90 99.06 6,439.69 6,368.79 -563.15 4,621.59 5,958,960.175 669,140.489 0.61 4,150.27 8,453.70 45.82 99.09 6,465.11 6,394.21 -567.28 4,647.46 5,958,956.611 669,166.437 0.23 4,173.16 8,490.20 45.82 99.14 6,490.55 6,419.65 -571.43 4,673.30 5,958,953.032 669,192.365 0.10 4,196.03 8,526.80 45.80 99.21 6,516.06 6,445.16 -575.61 4,699.21 5,958,949.415 669,218.356 0.15 4,218.94 8,563.30 45.75 99.27 6,541.52 6,470.62 -579.81 4,725.03 5,958,945.782 669,244.257 0.18 4,241.77 8,599.90 45.72 99.31 6,567.07 6,496.17 -584.04 4,750.89 5,958,942.118 669,270.208 0.11 4,264.63 8,636.50 45.65 99.41 6,592.63 6,521.73 -588.30 4,776.73 5,958,938.426 669,296.132 0.27 4,287.45 8,673.00 45.50 99.56 6,618.18 6,547.28 -592.60 4,802.44 5,958,934.694 669,321.929 0.51 4,310.14 8,709.60 45.35 99.67 6,643.87 6,572.97 -596.95 4,828.15 5,958,930.904 669,347.721 0.46 4,332.81 8,746.20 45.25 99.74 6,669.61 6,598.71 -601.34 4,853.79 5,958,927.081 669,373.452 0.31 4,355.40 8,782.70 45.23 99.77 6,695.32 6,624.42 -605.73 4,879.33 5,958,923.250 669,399.083 0.08 4,377.90 1/11/2017 8:46:08AM Page 14 COMPASS 5000.1 Build 81B sem'' Z b BP rr,-r■ p Final Survey Report HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C -31C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S EM Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 8,818.60 45.18 99.78 6,720.61 6,649.71 -610.05 4,904.44 5,958,919.475 669,424.276 0.14 4,400.01 8,854.60 45.07 99.84 6,746.01 6,675.11 -614.40 4,929.58 5,958,915.680 669,449.502 0.33 4,422.15 8,890.50 44.97 99.92 6,771.39 6,700.49 -618.76 4,954.59 5,958,911.872 669,474.607 0.32 4,444.17 8,926.10 44.87 100.00 6,796.59 6,725.69 -623.10 4,979.35 5,958,908.067 669,499.453 0.32 4,465.95 8,961.60 44.80 100.08 6,821.77 6,750.87 -627.47 5,004.00 5,958,904.244 669,524.188 0.25 4,487.62 8,997.30 44.72 100.18 6,847.12 6,776.22 -631.89 5,028.75 5,958,900.366 669,549.023 0.30 4,509.36 9,033.20 44.58 100.31 6,872.66 6,801.76 -636.38 5,053.57 5,958,896.424 669,573.941 0.47 4,531.15 9,069.00 44.47 100.43 6,898.18 6,827.28 -640.89 5,078.27 5,958,892.447 669,598.726 0.39 4,552.81 9,104.89 44.37 100.53 6,923.82 6,852.92 -645.46 5,102.97 5,958,888.420 669,623.519 0.34 4,574.46 9,140.80 44.28 100.63 6,949.50 6,878.60 -650.07 5,127.63 5,958,884.354 669,648.277 0.32 4,596.06 9,176.60 44.17 100.75 6,975.16 6,904.26 -654.70 5,152.17 5,958,880.261 669,672.907 0.39 4,617.53 9,212.39 44.00 100.86 7,000.87 6,929.97 -659.37 5,176.63 5,958,876.130 669,697.460 0.52 4,638.92 9,248.30 43.92 100.93 7,026.72 6,955.82 -664.08 5,201.11 5,958,871.955 669,722.033 0.26 4,660.31 9,288.50 43.77 100.95 7,055.71 6,984.81 -669.37 5,228.45 5,958,867.270 669,749.481 0.37 4,684.20 9,330.30 43.55 100.94 7,085.95 7,015.05 -674.85 5,256.78 5,958,862.413 669,777.925 0.53 4,708.95 9,371.99 43.47 100.98 7,116.19 7,045.29 -680.30 5,284.96 5,958,857.574 669,806.215 0.20 4,733.56 9,413.30 43.32 101.00 7,146.20 7,075.30 -685.71 5,312.82 5,958,852.775 669,834.186 0.36 4,757.89 9,454.10 43.02 101.14 7,175.96 7,105.06 -691.07 5,340.21 5,958,848.017 669,861.689 0.77 4,781.80 9,494.89 42.82 101.38 7,205.83 7,134.93 -696.50 5,367.46 5,958,843.191 669,889.042 0.63 4,805.54 9,535.70 42.67 101.50 7,235.80 7,164.90 -701.99 5,394.60 5,958,838.293 669,916.302 0.42 4,829.18 9,576.60 42.40 101.56 7,265.94 7,195.04 -707.52 5,421.70 5,958,833.361 669,943.507 0.67 4,852.74 9,617.39 42.07 101.68 7,296.14 7,225.24 -713.04 5,448.55 5,958,828.426 669,970.476 0.83 4,876.09 9,658.30 41.63 101.91 7,326.61 7,255.71 -718.62 5,475.27 5,958,823.436 669,997.308 1.14 4,899.29 9,699.10 41.08 102.23 7,357.24 7,286.34 -724.26 5,501.63 5,958,818.378 670,023.784 1.44 4,922.13 9,740.20 40.47 102.53 7,388.36 7,317.46 -730.01 5,527.85 5,958,813.199 670,050.120 1.56 4,944.80 9,781.09 39.92 102.76 7,419.60 7,348.70 -735.79 5,553.60 5,958,807.988 670,075.988 1.39 4,967.02 9,822.09 39.37 103.01 7,451.17 7,380.27 -741.62 5,579.10 5,958,802.715 670,101.608 1.40 4,988.99 1/11/2017 8:46:08AM Page 15 COMPASS 5000.1 Build 81B �•00- h BP rias ti•e! DD Final Survey Report BAKER HUGHES Company: North America -ALASKA - BP Local Coordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C -31C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM R5K-Alaska PROD -ANCP1 Survey - MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 9,863.10 38.67 103.30 7,483.03 7,412.13 -747.49 5,604.24 5,958,797.391 670,126.871 1.76 5,010.61 9,903.99 37.90 103.57 7,515.12 7,444.22 -753.38 5,628.88 5,958,792.047 670,151.633 1.93 5,031.75 9,944.80 37.08 103.82 7,547.50 7,476.60 -759.26 5,653.01 5,958,786.697 670,175.886 2.04 5,052.41 9,987.00 36.20 104.20 7,581.37 7,510.47 -765.36 5,677.45 5,958,781.137 670,200.447 2.15 5,073.29 10,006.00 35.82 104.20 7,596.73 7,525.83 -768.10 5,688.28 5,958,778.635 670,211.333 2.00 5,082.53 95/81, 10,011.00 35.72 104.20 7,600.79 7,529.89 -768.81 5,691.11 5,958,777.980 670,214.181 2.00 5,084.95 10,136.26 30.10 110.30 7,705.94 7,635.04 -788.70 5,756.09 5,958,759.520 670,279.573 5.20 5,139.20 10,229.57 25.99 128.17 7,788.42 7,717.52 -809.50 5,794.19 5,958,739.562 670,318.118 9.98 5,167.89 10,325.39 26.86 148.29 7,874.40 7,803.50 -840.95 5,822.13 5,958,708.730 670,346.738 9.35 5,183.39 10,421.37 28.45 166.49 7,959.57 7,888.67 -881.70 5,838.90 5,958,668.358 670,364.394 8.92 5,185.21 10,513.23 29.80 168.90 8,039.81 7,966.91 -925.38 5,848.41 5,958,624.902 670,374.854 1.95 5,179.21 10,604.14 32.24 163.85 8,117.73 8,046.83 -970.86 5,859.50 5,958,579.685 670,386.943 3.92 5,174.08 10,698.34 30.65 160.14 8,198.10 8,127.20 -1,017.58 5,874.65 5,958,533.306 670,403.110 2.66 5,172.33 10,788.09 29.10 160.11 8,275.92 8,205.02 -1,059.62 5,889.85 5,958,491.610 670,419.223 1.73 5,172.24 10,882.52 28.51 160.34 8,358.67 8,287.77 -1,102.44 5,905.25 5,958,449.145 670,435.550 0.64 5,172.06 10,945.88 28.62 157.49 8,414.32 8,343.42 -1,130.70 5,916.14 5,958,421.132 670,447.062 2.16 5,172.63 11,039.39 28.21 157.42 8,496.56 8,425.66 -1,171.79 5,933.20 5,958,380.422 670,465.017 0.44 5,174.61 11,133.32 28.79 157.09 8,579.11 8,508.21 -1,213.13 5,950.53 5,958,339.480 670,483.246 0.64 5,176.76 11,225.99 29.36 156.54 8,660.10 8,589.20 -1,254.52 5,968.26 5,958,298.486 670,501.877 0.68 5,179.26 11,319.38 29.63 154.60 8,741.39 8,670.49 -1,296.38 5,987.28 5,958,257.058 670,521.805 1.06 5,182.82 TIP 11,325.00 29.92 155.19 8,746.27 8,675.37 -1,298.91 5,988.46 5,958,254.558 670,523.044 7.27 5,183.06 KOP 11,350.64 39.41 161.00 8,767.34 8,696.44 -1,312.44 5,993.81 5,958,241.145 670,528.685 39.17 5,183.46 Interpolated Azimuth 11,380.16 44.01 170.00 8,789.39 8,718.49 -1,331.43 5,998.65 5,958,222.270 670,533.937 25.55 5,181.51 Interpolated Azimuth 1111/2017 8:46:08AM Page 16 COMPASS 5000.1 Build 81B 2Wo,�: by ME as ti0#0r Final Report Survey Rt BAKER HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well C-31 Project: Prudhoe Bay ND Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C-31 C Survey Calculation Method: Minimum Curvature Design: C-31C Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) ND TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (1) (1) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 11,410.08 44.57 181.50 8,810.84 8,739.94 -1,352.19 6,000.18 5,958,201.545 670,535.924 26.88 5,175.85 Interpolated Azimuth 11,440.19 43.16 193.50 8,832.59 8,761.69 -1,372.81 5,997.50 5,958,180.880 670,533.690 27.98 5,166.28 Interpolated Azimuth 11,470.05 43.56 204.88 8,854.33 8,783.43 -1,392.10 5,990.77 5,958,161.445 670,527.392 26.18 5,153.36 11,500.17 43.26 214.71 8,876.24 8,805.34 -1,410.02 5,980.52 5,958,143.306 670,517.532 22.44 5,137.59 11,530.09 43.90 225.87 8,897.94 8,827.04 -1,425.69 5,967.22 5,958,127.346 670,504.576 25.78 5,119.73 11,560.15 44.13 236.56 8,919.59 8,848.69 -1,438.73 5,950.98 5,958,113.955 670,488.628 24.75 5,100.01 11,590.05 47.84 244.68 8,940.38 8,869.48 -1,449.22 5,932.25 5,958,103.063 670,470.135 23.08 5,078.83 11,620.26 52.65 253.16 8,959.72 8,888.82 -1,457.50 5,910.60 5,958,094.311 670,448.673 26.80 5,055.65 11,650.44 57.93 260.57 8,976.91 8,906.01 -1,463.08 5,886.46 5,958,088.205 670,424.667 26.69 5,031.06 11,680.27 63.44 268.47 8,991.53 8,920.63 -1,465.51 5,860.61 5,958,085.208 670,398.873 29.55 5,005.94 11,710.26 68.68 274.51 9,003.70 8,932.80 -1,464.77 5,833.23 5,958,085.350 670,371.491 25.37 4,980.47 11,740.26 74.88 267.94 9,013.09 8,942.19 -1,464.19 5,804.78 5,958,085.307 670,343.030 29.31 4,953.92 11,770.26 81.47 262.49 9,019.24 8,948.34 -1,466.65 5,775.55 5,958,082.204 670,313.861 28.25 4,925.61 11,801.98 87.97 256.47 9,022.16 8,951.26 -1,472.42 5,744.52 5,958,075.757 670,282.975 27.87 4,894.49 11,832.26 89.29 253.37 9,022.88 8,951.98 -1,480.30 5,715.30 5,958,067.245 670,253.932 11.12 4,864.33 11,862.48 90.61 249.20 9,022.91 8,952.01 -1,489.99 5,686.68 5,958,056.928 670,225.538 14.47 4,834.13 11,892.59 92.24 253.08 9,022.16 8,951.26 -1,499.72 5,658.21 5,958,046.579 670,197.282 13.97 4,804.04 11,922.50 90.80 257.98 9,021.36 8,950.46 -1,507.19 5,629.26 5,958,038.480 670,168.512 17.07 4,774.29 11,952.26 90.40 262.04 9,021.05 8,950.15 -1,512.35 5,599.96 5,958,032.679 670,139.333 13.71 4,744.99 11,982.54 90.12 266.38 9,020.91 8,950.01 -1,515.40 5,569.85 5,958,028.967 670,109.292 14.36 4,715.64 12,010.16 90.74 272.12 9,020.71 8,949.81 -1,515.76 5,542.24 5,958,028.001 670,081.703 20.90 4,689.58 12,041.28 90.15 275.78 9,020.47 8,949.57 -1,513.62 5,511.20 5,958,029.465 670,050.626 11.91 4,661.15 12,070.34 90.92 279.14 9,020.19 8,949.29 -1,509.85 5,482.39 5,958,032.605 670,021.744 11.86 4,635.36 12,100.60 93.04 283.36 9,019.15 8,948.25 -1,503.95 5,452.74 5,958,037.852 669,991.971 15.60 4,609.52 12,130.20 91.14 287.51 9,018.07 8,947.17 -1,496.08 5,424.23 5,958,045.097 669,963.302 15.41 4,585.42 1/11/2017 8:46.08AM Page 17 COMPASS 5000.1 Build 81B BP RUN � � Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C-31 C Survey Calculation Method: Minimum Curvature Design: C-31 C Database: EDM R5K - Alaska PROD - ANCP1 Survey - MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°► (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 12,160.46 90.52 284.18 9,017.63 8,946.73 -1,487.82 5,395.13 5,958,052.717 669,934.027 11.19 4,560.90 12,190.32 89.97 280.59 9,017.50 8,946.60 -1,481.42 5,365.97 5,958,058.480 669,904.736 12.16 4,535.69 12,220.53 90.12 277.30 9,017.48 8,946.58 -1,476.72 5,336.13 5,958,062.522 669,874.804 10.90 4,509.26 12,250.41 90.03 273.97 9,017.44 8,946.54 -1,473.79 5,306.40 5,958,064.804 669,845.018 11.15 4,482.32 12,280.44 89.20 270.10 9,017.64 8,946.74 -1,472.72 5,276.40 5,958,065.213 669,814.999 13.18 4,454.49 12,309.97 87.45 265.72 9,018.50 8,947.60 -1,473.80 5,246.91 5,958,063.493 669,785.543 15.97 4,426.41 12,340.47 87.97 261.95 9,019.72 8,948.82 -1,477.07 5,216.61 5,958,059.558 669,755.330 12.47 4,396.83 12,370.42 88.46 258.28 9,020.66 8,949.76 -1,482.21 5,187.13 5,958,053.776 669,725.965 12.36 4,367.36 12,400.46 88.00 254.84 9,021.58 8,950.68 -1,489.19 5,157.93 5,958,046.162 669,696.928 11.55 4,337.54 12,430.32 88.74 251.10 9,022.43 8,951.53 -1,497.93 5,129.39 5,958,036.800 669,668.594 12.76 4,307.73 12,460.50 88.43 248.72 9,023.18 8,952.28 -1,508.29 5,101.06 5,958,025.820 669,640.497 7.95 4,277.57 12,490.18 87.11 243.70 9,024.34 8,953.44 -1,520.25 5,073.93 5,958,013.271 669,613.639 17.48 4,247.98 12,520.67 89.85 247.70 9,025.14 8,954.24 -1,532.79 5,046.16 5,958,000.129 669,586.151 15.90 4,217.60 12,549.86 89.85 253.23 9,025.22 8,954.32 -1,542.54 5,018.66 5,957,989.773 669,558.874 18.94 4,188.42 12,580.38 89.32 257.94 9,025.44 8,954.54 -1,550.14 4,989.11 5,957,981.533 669,529.499 15.53 4,158.05 12,608.10 89.11 261.99 9,025.82 8,954.92 -1,554.97 4,961.83 5,957,976.109 669,502.326 14.63 4,130.76 12,640.42 90.74 267.85 9,025.86 8,954.96 -1,557.83 4,929.65 5,957,972.545 669,470.220 18.82 4,099.55 12,666.70 88.96 266.78 9,025.93 8,955.03 -1,559.06 4,903.40 5,957,970.740 669,444.006 7.90 4,074.46 12,696.07 88.77 263.77 9,026.51 8,955.61 -1,561.48 4,874.14 5,957,967.682 669,414.807 10.27 4,046.13 12,728.82 88.83 260.35 9,027.20 8,956.30 -1,566.00 4,841.71 5,957,962.451 669,382.492 10.44 4,014.12 12,755.90 88.68 257.23 9,027.79 8,956.89 -1,571.26 4,815.16 5,957,956.609 669,356.061 11.53 3,987.37 12,786.34 88.47 253.35 9,028.55 8,957.65 -1,578.99 4,785.73 5,957,948.242 669,326.812 12.76 3,957.07 12,812.06 88.19 248.47 9,029.30 8,958.40 -1,587.39 4,761.44 5,957,939.307 669,302.715 19.00 3,931.37 12,840.36 87.42 244.94 9,030.38 8,959.48 -1,598.57 4,735.47 5,957,927.561 669,276.998 12.76 3,903.15 12,870.38 88.13 240.98 9,031.55 8,960.65 -1,612.21 4,708.76 5,957,913.346 669,250.592 13.39 3,873.38 12,900.00 89.11 238.15 9,032.26 8,961.36 -1,627.21 4,683.23 5,957,897.794 669,225.400 10.11 3,844.26 12,930.74 89.91 233.50 9,032.52 8,961.62 -1,644.47 4,657.81 5,957,879.981 669,200.362 15.35 3,814.47 1/11/2017 8:46:08AM Page 18 COMPASS 5000.1 Build BIB by Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C-31 C Design: C-31 C Survey MD Inc Well C-31 (usft) 1°I C-31A/B OKB @ 70.90usft 12,960.42 88.56 12,990.38 89.85 13,020.32 89.05 13,050.58 86.77 13,080.60 89.57 13,105.40 90.58 13,130.38 92.70 13,160.42 93.04 13,190.40 93.56 13,220.32 92.45 13,251.17 90.55 13,280.40 88.46 13,310.40 89.26 13,340.19 89.48 13,370.22 88.89 13,410.22 90.95 13,440.50 91.51 13,470.63 90.43 13,500.10 89.08 13,530.59 91.54 13,560.44 92.71 13,579.66 92.15 13,602.00 92.15 PRODUCTION LINER 1 669,117.355 13,612.00 92.15 Projection to TD 9,035.69 BP //.a■ Final Survey Report BAKER HUGHES Local Co-ordinate Reference: Well C-31 TVD Reference: C-31A/B OKB @ 70.90usft MD Reference: C-31A/B OKB @ 70.90usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 229.32 9,032.92 8,962.02 -1,662.98 4,634.62 5,957,860.972 669,177.583 14.80 3,786.35 225.35 9,033.34 8,962.44 -1,683.27 4,612.60 5,957,840.199 669,156.011 13.93 3,758.71 221.77 9,033.62 8,962.72 -1,704.96 4,591.97 5,957,818.063 669,135.864 12.25 3,731.91 216.26 9,034.73 8,963.83 -1,728.45 4,572.94 5,957,794.169 669,117.355 19.69 3,705.99 213.30 9,035.69 8,964.79 -1,753.09 4,555.83 5,957,769.162 669,100.789 13.57 3,681.49 211.20 9,035.65 8,964.75 -1,774.06 4,542.59 5,957,747.907 669,088.019 9.40 3,661.88 209.18 9,034.94 8,964.04 -1,795.64 4,530.04 5,957,726.058 669,075.940 11.72 3,642.70 213.31 9,033.43 8,962.53 -1,821.29 4,514.48 5,957,700.080 669,060.947 13.78 3,619.31 216.15 9,031.71 8,960.81 -1,845.88 4,497.43 5,957,675.119 669,044.441 9.61 3,594.87 219.79 9,030.14 8,959.24 -1,869.43 4,479.05 5,957,651.174 669,026.582 12.70 3,569.55 224.51 9,029.33 8,958.43 -1,892.29 4,458.36 5,957,627.873 669,006.400 16.49 3,542.29 221.37 9,029.58 8,958.68 -1,913.68 4,438.45 5,957,606.050 668,986.966 12.90 3,516.26 218.37 9,030.18 8,959.28 -1,936.70 4,419.23 5,957,582.618 668,968.251 10.35 3,490.33 214.99 9,030.51 8,959.61 -1,960.59 4,401.44 5,957,558.350 668,950.988 11.37 3,465.44 209.86 9,030.94 8,960.04 -1,985.92 4,385.34 5,957,532.669 668,935.452 17.19 3,441.65 203.33 9,030.99 8,960.09 -2,021.67 4,367.45 5,957,496.542 668,918.343 17.12 3,412.60 197.60 9,030.34 8,959.44 -2,050.02 4,356.87 5,957,467.969 668,908.387 19.01 3,392.97 193.20 9,029.83 8,958.93 -2,079.06 4,348.87 5,957,438.766 668,901.027 15.03 3,375.52 188.03 9,029.96 8,959.06 -2,108.01 4,343.44 5,957,409.701 668,896.236 18.13 3,360.52 189.32 9,029.79 8,958.89 -2,138.15 4,338.84 5,957,379.472 668,892.299 9.11 3,345.89 192.12 9,028.69 8,957.79 -2,167.45 4,333.30 5,957,350.054 668,887.394 10.16 3,330.65 193.43 9,027.87 8,956.97 -2,186.18 4,329.05 5,957,331.240 668,883.559 7.41 3,320.26 193.43 9,027.03 8,956.13 -2,207.89 4,323.86 5,957,309.420 668,878.851 0.00 3,307.96 193.43 9,026.66 8,955.76 -2,217.61 4,321.54 5,957,299.652 668,876.744 0.00 3,302.45 1/11/2017 8:46:08AM Page 19 COMPASS 5000.1 Build 818 by w `00 Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C -31C Design: C-31 C 13,602.00 9,027.03 PRODUCTION LINER 1 BP Final Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: 2.375 3.250 Well C-31 C-31A/B OKB @ 70.90usft C-31A/B OKB @ 70.90usft True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 rias BAKER HUGHES Design Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 11,319.38 8,741.39 -1,296.38 5,987.28 TIP 11,325.00 6,746.27 -1,298.91 5,988.46 KOP 11,350.64 6,767.34 -1,312.44 5,993.81 InterpolatedAzimuth 11,380.16 8,789.39 -1,331.43 5,998.65 Interpolated Azimuth 11,410.08 8,810.84 -1,352.19 6,000.18 Interpolated Azimuth 11,440.19 8,832.59 -1,372.81 5,997.50 Interpolated Azimuth 13,612.00 9,026.66 -2,217.61 4,321.54 Projection to TD Approved By: Yosha Ragbirsingh Survey Manager Baker Hughes 1/11/2017 8:46.08AM Page 20 COMPASS 5000.1 Build 818 Project: PrudhoeBay i.Io 10- � -- -18.16. a y -Mmo0oewpu2wenroaro,g_Yvm.m.m.,�9N.r->M-omS�. teee+.M..aat 6++ o W.- E LLB-O_-., — . R EC. DETAILS: ETAILS: _C. -..3o-0-1I�C m - -R_ER.E-. N�---C- .EJWF_� OF�r'. /- �R__ M4-TO p N Site: PBC Pad Well:C-3, sMgMtFeC-31C Co-d(WEJRehrence: We0CJ1,T- C,1 bp r,u —eN —SM/ � �/-►_._ -__3T .-�- W-- - ..5,9602.5 0 . Vedcal(NOJReeece�tAROKa@70.p0sfl Wellbore: C11C 5ed(V)RehreSbl-(O.00N, 0.60E) Dv parent Wellbore: C-31AkaBAKER Design: C1C (C-311C1C) rsn+ A wdnOelA Reteerc: Cd1FIBONB@70.BOuR acrap+ Tie on MD: 1131939 cabpappn MebdMnmumcunde HUGHEv�. , S Post Drilling Easting (250 usft/in) m m m m mm m 01 im m m m m m m mm m m m m N m mm m mm m V O N N O N 0 N Ca N 0 00 O O O O N O N O N O O N O N O N V O N N O N N O N O O O 0 0 0 00 0 O N O N O N O N O N 0 0 O O O O O O O O O O O O O O O O 5961500d -68 8C iBIC-08 �00 C-0 /C -03B 5961500 C-06/13110 A,B1 C /GO CC -03 C -O CPBt 3M 901C-Q8B 5961250 1 oB 5961000 C -o_ 1 C-39/C_39A 5961000 C-0IC-oEl 5960750 5960750�3{C 5960500 39;C-39 PB1 d --4-11C-418 5960500 5960250 -T- 5960000- T 5960000 5960000G39/C 39 C-41JC-4 C -07/C-0 5959750C -07/C-0 A 5959750 5959500 5959500 C24/C 445959250 5959250 4 o C -32/C -32A 5959000 NG' 4/C-2 B 5959000 60C-01/ C -30/C-30 C -32/C-3285958750 5958750 Vs01Ao 0-32/0- 2C y5958500 C=24 _32102 59585000-31 -3 -31PB1 59582500„Z 5958250 C 5958000 00 C 0/C- OA 5958000 32/ -325957750 70 2/131` 5957750 C -26/C- 6A 5957500 C 3 /C -31B C-26/0- 6 5957500 6000 5182 5957250 _ -i 5957250 0 60005957000 5957000 0 5956750 - C37 �CzC- _-1211B _ rnrn rn rnVN NNV NmV _ mVNV 5956750 0 25956500 C -28/C-2 -2 /C-2gB 7�000 7_8/0288 5956500 C2?TAP 1 JC 5956250C - G 0C/C-05 C-29/0 2C3C-311A 5956250 000 10 7C27 90 0 m, N m m m m W c, N 01 0+ W N O N N O N N VO m O,QO 0 0 w 0 O O O O OOOOOO N O N N O N N V O N NV O N N V O N N O N N O OOOOO O OOOOOOOOO0O0OOOO OC-31AIB OKB @ 70.90usft O O O O Easting (250 usft/in) -AO ORT - North America - ALASKA - BP Prudhoe Bay PB C Pad C-31 C-31 C C-31 C AOGCC Post Drilling Offset Report 20 December, 2016 WE i" a-- a BAKER HUGHES /�QQ GCC OFFSET REPORT BP FrA it 6 N Anticollision Report BAKER NUGNES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00usft Reference Well: C-31 Well Error: 0.00usft Reference Wellbore C-31 C Reference Design: C -31C Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well C-31 C-31A/B OKB @ 70.90usft C-31A/B 0 K @ 70.90usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference C -31C Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 12/16/2016 From To (usft) (usft) Survey (Wellbore) Tool Name 50.00 9,944.80 GCT (C-31PBI) GCT -MS 9,987.00 11,319.38 2: MWD - Standard (C -31A) MWD 11,325.00 13,579.66 CTKMWD 3-1/4" (C-31 C) MWD Description Schlumberger GCT multishot MWD - Standard MWD - Standard 12120/2016 12: 57:21 PM Page 2 of 5 COMPASS 5000.1 Build 81B AOOCC OFFSET 1rR-)1EpORT a Anticollision Report BAKER '*+ HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay ND Reference: C-31A/B OKB @ 70.90usft Reference Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Site Error: 0.00usft North Reference: True Reference Well: C-31 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore C -31C Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: C-31 C Offset ND Reference: Offset Datum Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) PB C Pad C-01 - C-01 - C-01 1,237.52 1,225.00 262.40 24.17 238.25 Pass - Major Risk C-01 - C -01A - C-01 A 1,252.10 1,250.00 262.62 24.60 238.03 Pass - Major Risk C-01 - C-01 B - C-01 B 1,252.10 1,250.00 262.62 24.60 238.03 Pass - Major Risk C-01 - C-01 BPB1 - C-01 BPB1 1,252.10 1,250.00 262.62 24.38 238.25 Pass - Major Risk C-02 - C-02 - C-02 1,236.26 1,225.00 356.47 21.89 334.59 Pass - Major Risk C-02 - C -02A- C -02A 1,236.26 1,225.00 356.47 21.89 334.59 Pass - Major Risk C-03 - C-03 - C-03 1,236.59 1,225.00 458.98 22.39 436.60 Pass - Major Risk C-03 - C -03A - C -03A 1,236.59 1,225.00 458.98 22.39 436.60 Pass - Major Risk C-03 - C -03B - C -03B 1,249.51 1,250.00 459.17 22.57 436.61 Pass- Major Risk C-03 - C -03C - C -03C 1,249.51 1,250.00 459.17 22.31 436.87 Pass- Major Risk C-03 - C-03CPB1 - C-03CPB1 1,249.51 1,250.00 459.17 22.57 436.61 Pass - Major Risk C-05 - C-05 - C-05 1,517.01 1,500.00 183.51 26.64 156.92 Pass - Major Risk C-05 - C -05A - C -05A 1,517.01 1,500.00 183.51 26.64 156.92 Pass - Major Risk C-06 - C-06 - C-06 1,390.60 1,375.00 84.42 25.19 59.27 Pass - Major Risk C-06 - C -06A- C -06A 1,390.60 1,375.00 84.42 25.19 59.27 Pass- Major Risk C-06 - C-06APB1 - C-06APB1 1,390.60 1,375.00 84.42 25.19 59.27 Pass - Major Risk C-06 - C -06B - C -06B 1,390.60 1,375.00 84.42 25.19 59.27 Pass - Major Risk C-07 - C-07 - C-07 1,215.58 1,200.00 9.86 24.26 -14.40 FAIL - Major Risk C-07 - C -07A- C -07A 1,215.58 1,200.00 9.86 24.26 -14.40 FAIL- Major Risk C-08 - C-08 - C-08 1,262.82 1,250.00 107.49 22.47 85.02 Pass - Major Risk C-08 - C -08A- C -08A 1,253.89 1,250.00 107.38 22.35 85.03 Pass - Major Risk C-08 - C-08APB1 - C-08APB1 1,253.89 1,250.00 107.38 22.35 85.03 Pass - Major Risk C-08 - C -08B - C -08B 1,253.89 1,250.00 107.38 22.35 85.03 Pass - Major Risk C-08 - C-08BPB1 - C-08BPB1 1,253.89 1,250.00 107.38 22.35 85.03 Pass- Major Risk C-08 - C -08C - C -08C 1,253.89 1,250.00 107.38 22.35 85.03 Pass - Major Risk C-08 - C-08CPB1 - C-08CPB1 1,253.89 1,250.00 107.38 22.35 85.03 Pass - Major Risk C-08 - C-08CPB2 - C-08CPB2 1,253.89 1,250.00 107.38 22.35 85.03 Pass - Major Risk C-23 - C-23 - C-23 1,238.26 1,250.00 485.73 23.50 462.24 Pass - Major Risk C-23 - C -23A - C -23A 1,227.49 1,225.00 485.50 23.25 462.26 Pass - Major Risk C-23 - C -23B - C -23B 1,242.52 1,250.00 485.86 23.60 462.27 Pass - Major Risk C-23 - C -23C - C -23C 1,242.52 1,250.00 485.86 23.60 462.27 Pass - Major Risk C-23 - C -23D - C -23D 1,242.52 1,250.00 485.86 23.60 462.27 Pass - Major Risk C-24 - C-24 - C-24 1,220.66 1,225.00 384.28 25.56 358.73 Pass - Major Risk C-24 - C -24A- C -24A 1,225.00 1,225.00 384.36 25.61 358.75 Pass - Major Risk C-24 - C -24B - C -24B 1,225.00 1,225.00 384.36 25.61 358.75 Pass - Major Risk C-24 - C-24BPB1 - C-24BPB1 1,225.00 1,225.00 384.36 25.61 358.75 Pass - Major Risk C-25 - C-25 - C-25 1,220.53 1,225.00 280.74 22.54 258.22 Pass - Major Risk C-25 - C -25A - C -25A 1,219.87 1,225.00 280.73 22.53 258.22 Pass - Major Risk C-25 - C-256 - C -25B 1,219.87 1,225.00 280.73 22.53 258.22 Pass - Major Risk C-26 - C-26 - C-26 1,199.65 1,200.00 211.34 23.32 188.03 Pass - Major Risk C-26 - C -26A- C -26A 1,199.65 1,200.00 211.34 23.32 188.03 Pass - Major Risk C-27 - C-27 - C-27 1,198.35 1,200.00 168.27 23.84 144.44 Pass - Major Risk C-27 - C -27A - C -27A 1,198.45 1,200.00 168.27 23.84 144.44 Pass - Major Risk C-27 - C-27APB1 - C-27APB1 1,198.45 1,200.00 168.27 23.84 144.44 Pass - Major Risk C-27 - C -27B - C -27B 1,198.35 1,199.96 168.27 23.84 144.44 Pass - Major Risk C-27 - C -27C - C -27C 1,198.35 1,199.96 168.27 23.84 144.44 Pass - Major Risk C-28 - C-28 - C-28 394.98 400.00 164.33 7.75 156.58 Pass - Major Risk C-28 - C -28A - C -28A 394.98 400.00 164.33 7.75 156.58 Pass - Major Risk C-28 - C -28B - C -28B 401.67 400.00 164.50 7.91 156.59 Pass - Major Risk C-28 - C -28B - C -28B Wp6.0 400.01 400.00 164.46 7.87 156.59 Pass - Major Risk C-29 - C-29 - C-29 399.89 400.00 99.21 9.51 89.70 Pass - Major Risk C-29 - C -29A - C -29A 399.89 400.00 99.21 9.51 89.70 Pass - Major Risk C-29 - C -29B - C-296 383.81 400.00 98.70 8.97 89.73 Pass - Major Risk 12/2012016 12:57 21 PM Page 3 of 5 COMPASS 5000.1 Build 81B QO"CCC OFF�ET `REP0RT ,�...� by BP //b'd i + Anticollision Report BAKER �100W HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00usft Reference Well: C-31 Well Error: 0.00usft Reference Wellbore C -31C Reference Design: C -31C Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well C-31 C-31A/B OKB @ 70.90usft C-31A/B 0 K @ 70.90usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) PB C Pad C-29 - C-298 - Plan #7 C -29B approved 384.13 400.00 98.71 8.98 89.72 Pass - Major Risk C-30 - C-30 - C-30 1,227.23 1,225.00 164.81 22.22 142.60 Pass - Major Risk C-30 - C -30A - C -30A 1,227.25 1,225.00 164.81 22.22 142.60 Pass - Major Risk C-31 - C-31 - C-31 10,249.23 10,250.00 22.01 10.54 11.88 Pass - Major Risk C-31 - C -31A - C -31A Out of range C-31 - C-31 B- C-31 B Out of range C-31 - C-31 PB1 - C-31 PB1 10,249.23 10,250.00 22.01 10.24 12.18 Pass - Major Risk C-32 - C-32 - C-32 4,480.70 4,325.00 88.52 234.47 -144.66 FAIL - Major Risk C-32 - C -32A - C -32A 4,480.70 4,325.00 88.52 234.47 -144.66 FAIL - Major Risk C-32 - C -32B - C -32B 4,478.38 4,325.00 88.46 234.26 -144.64 FAIL- Major Risk C-32 - C -32C - C -32C 4,478.38 4,325.00 88.46 234.26 -144.64 FAIL - Major Risk C-32 - C -32D - C -32D 4,478.38 4,325.00 88.46 234.26 -144.64 FAIL - Major Risk C-32 - C-32DPB1 - C-32DPB1 4,478.38 4,325.00 88.46 234.26 -144.64 FAIL- Major Risk C-34 - C-34 - C-34 1,227.22 1,225.00 213.96 21.74 192.22 Pass - Major Risk C-34 - C -34A - C -34A 1,227.22 1,225.00 213.96 21.74 192.22 Pass - Major Risk C-34 - C -34A - Plan #2 1,227.22 1,225.00 213.96 21.74 192.22 Pass - Major Risk C-39 - C-39 - C-39 370.53 375.00 35.58 6.81 28.77 Pass - Major Risk C-39 - C -39A - C -39A 370.53 375.00 35.58 6.81 28.77 Pass - Major Risk C-39 - C-39APB1 - C-39APB1 370.53 375.00 35.58 6.81 28.77 Pass - Major Risk C-39 - C-39PB1 - C-39PB1 370.53 375.00 35.58 6.81 28.77 Pass - Major Risk C-41 - C-41 - C-41 1,918.50 1,925.00 114.86 29.52 86.69 Pass - Major Risk C-41 - C-41 A - C-41 A 1,918.50 1,925.00 114.86 29.52 86.69 Pass - Major Risk C-41 - C-41APB1 - C-41APB1 1,918.50 1,925.00 114.86 29.52 86.69 Pass - Major Risk C-41 - C-41 B - C-41 B 1,918.50 1,925.00 114.86 29.54 86.69 Pass - Major Risk 1212012016 12:57.21PM Page 4 of 5 COMPASS 5000.1 Build 81B AOOMC',:"C OFFSET rmR_'N1EpORT iBP p Anticolli/.�. ZW sion Report BAKER HUGHES Company: Project: Reference Site: Site Error: Reference Well: Well Error: Reference Wellbore Reference Design: North America - ALASKA - BP Prudhoe Bay PB C Pad 0.00usft C-31 0.00usft C-31 C C-31 C Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well C-31 C-31A/B OKB @ 70.90usft C-31A/B OKB @ 70.90usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to C-31A/B OKB @ 70.90usft Coordinates are relative to: C-31 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK Central Meridian is 150' 0'0.000 W' Grid Convergence at Surface is: 1.25' 12/20/2016 12:57:21 PM Page 5 of 5 COMPASS 5000.1 Build 81B AOC"CC 0FR"SES G3Cp0oRT Ladder Plot 600 - - - - - - - - -----'--------'-- I I ------ - -.,.. - - ' ----- I I - - - -- -J---- I - 1 - - ---J----' I C 1 I I I I 450 --- -'' -' - - 1- -------- -- -' -- - - - C) I I � I I I I I I I I I -- I C --I- O - - - - -- -'--------'- ---- ---- -' -- -- - - - - -' - - --- I l m Q -. 300 + L I I I I I C I I I I I n I ti I F I I I I I 150 a� v LEGEND ' C -----'--- f -----I- ---- ------------- -C- C-08, G08CPB2, C-08CPB2 V0 - -- $ G25, G29B, C - - --- - 29 VO $ 01A,IC-0 A V5 $ C-23, G23, G23 V3 -�f- G29, G29B, Plan 7 G29B ap ro\,edl,VO �n V1,G01BPB1,&0 1 VO �23,G23B,G2� $� G30,C-30l�66V2 12000 �r C-02, G02, G02 V1 G02,G02A,C-02AVO C- M,eG2Ji11Z'f7eih (2000 us n) � C-31, G31, C-31 V3 -F --I- C-23,G23D,C-23 VO -$- G31,G31A,G31AV1 $ G03, G03A, C -03A V6 -f- G24, G24A, G24A V7 -rsr- G31, C-31 P B 1, G31 PB 1 VO $ G03, G03B, G03B V5 G24, G24B, G24B VO $ C-32, C-32, G32 V 1 C-03,CO3C,C-03CVO $ G24,G24BPB1,G24BPB1 VO $ G32,G32A,C-32AV2 C-03,G03CPB1,C-03CPBIVO -iQ- C-25,G25,G25V2 - G32,G32B,G32BV3 $ C-05, G05, G05 V4 $ G25, G25A, C -25A V2 -fir C-32, G32C, G32C V2 --C+ G05, G05A, C -05A V9 G25, G25B, G25B V4 -e- C-32, G32D, G32D VO $ C-06, G06, G06 V4 C-26, C-26, C-26 V1 - G32, G32DPB1, G32DPB1 VO $ G06, G06A, C -06A V2 $ G26, G26A, G26A V1 $ C-34, C-34, C-34 V1 $ C-06,C06APB1,C-06APB1 V2 $ C-27,C-27,G27V1 G34,G34A,C-34AV2 G06 G066 G06B V6 G27 G27A G27A V4 G34 G34A Plan #2V2 12/20/2016 12:57:21 PM Page 5 of 5 COMPASS 5000.1 Build 81B AOC"CC 0FR"SES G3Cp0oRT Printed 1/10/2017 9:43:52AM North America - ALASKA - BP Page 1 of 2 Cementing Report Common Well Name: -31T64 04 Report no.: 1 Report date: 12/13/2016 Project: Prudhoe Bay Site: PB C Pad Spud Date/Time: 1/2/1988 Event Type: COM- ONSHORE (CON) Start Date: 12/10/2016 End Date: 12/15/2016 AFE No.: Contractor: NORDIC CALISTA Rig Name/No.: NORDIC 2 Rig Release: 12/15/2016 X3 -01854-C: (967,141.00 ) BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) General Information Job type: Primary Cement job start date/time: 12/13/2016 12:OOPM Job end date/time: 12/13/2016 1:30PM Cement Company: SCHLUMBERGER Cementer: HACKER Cemented String: PRODUCTION LINER 1 String Size: 2.375 (in) String Set TMD: 13,602.00 (usft) Hole Size: 3.250 (in) Pipe Movement Pipe Movement: NO MOVEMENT Rotating Time (Start -End): RPM: Rotating Torque (init/av /max ) (ft-Ibf) Reciprocating Time (Start -End): Recip Drag Up/Down: - (kip) SPM: Stroke Length: Fluid Name: CEMENT Fluids (1 of 1) Slurry Type: CEMENT Purpose: PRIMARY Class: G -CLASS Description: LEAD SLURRY Density: 15.30 (ppg) Yield: 1.3100 (ft'/sk) Mix Water Ratio: 6.097 (gal/sk94) Excess: Mix Method: BATCH Sacks Used: 69.50 (941b sacks) Water Volume: 10.1 (bbl) Excess Slurry Volume: 0.0 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: 13.3 (bbl) Slurry Volume: 16.2 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 0.00 (ppg) PV: 0.00 (cp) YP: 0.000 (Ibf/100ft2) Viscosity: 0.00 (s/qt) Gels 10 Sec: 0.000 (Ibf/100ft2) Gels 10 Min: 0.000 (Ibf/100ft2) Additives Name Type Amount Units Concentration Unit D047 ANTIFOAM AGENT 0.200 GAL/SX D065 DISPERSANT 1.000 % BWOC D167 FLUID LOSSo 0.100 /o BWOC D600 G GAS -BLOCK 1.500 GAL/SX D163 MICRO 5.000 % BWOC D800 RETARDER 0.200 % BWOC Fluid Tests Thick time Thick Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength (h r) temp. (%) temp. (cc/30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) (°F) (°F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) (min) (psi) (°F) (min) 5.38 90.00 0.00 80.00 44.0 180.00 1,000.00 Printed 1/10/2017 9:43:52AM Printed 1/10/2017 9:43:52AM North America - ALASKA - BP Page 2 of 2 Cementing Report CommWellon Name: C-31 / 04 date Report no.: 1 Report date: 12/13/2016 Project: Prudhoe Bay Site: PB C Pad Spud Date/Time: 1/2/1988 Event Type: COM- ONSHORE (CON) Start Date: 12/10/2016 End Date: 12/15/2016 AFE No.: Contractor: NORDIC CALISTA Rig Name/No.: NORDIC 2 Rig Release: 12/15/2016 X3 -01854-C: (967,141.00 ) BPUOI: Active datum: C-31A/B OKB @70.90usft (above Mean Sea Level) Stages Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom Plug Pressure Float Pressure Returns Circulate Cmt Vol to TotalAnnular no. (usft) (usft) Rate Press. Plug Plug Bumped Bumped Held Held Prior Surface Mud Lost Flow (gpm) (psi) (psi) (min) (hr) (bbl) (bbl) After 1 PRIMARY CEMENT 11,295.00 13,602.00 Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumped Disp. Rate TMD TMD Pmp date/time job Used temp. temp. (bbl) Rate (bbl/min) (usft) (usft) (scf) (bbl/min) Tests Casing Test Shoe Test Liner Top Test Test Pressure: (psi) FIT/LOT: (ppg) Liner Overlap: (usft) Time: (min) Tool: N Positive Test: (ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Hrs Prior to Log: (hr) How Determined: Printed 1/10/2017 9:43:52AM RECEI Sir - FICA!S JAN 17 2017 PRINT DISTRIBUTION LIST BAKER HUGHES qq ��''''�� n COMPANY � =CoAlaska Inc. WELL NAME C -31C FIELD Prudhoe Bay Unit 21 61 34 27918 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 DATA LOGGED t /54/201-7 900 E. Benson Blvd. M. K. BENDER Anchorage, Alaska 99508 to acknowledge receipt of this data. COUNTY North Slope Borough LOG TYPE RPM:PNC3D BHI DISTRICT Alaska --- LOG DATE December 22, 2017 AUTHORIZED BY Paul Canizares EMAIL Paul.CanizaresCa)bakerhughes.com TODAYS DATE January 16, 2017 STATUS Final Replacement: COMPANY ADDRESS CEDEX WILL NOT DELIVER TO P.O. BO* PERSON ATTENTION Revision No Details: Rev. Requested by: FIELD / FINAL CD/DVD FINAL 1 BP North Slope. PRELIM 0 (las, dlis, PDF, META, SURVEY REPORT LOGS LOGS I CGM, Final Surveys) (Compass) —# OF PRINTS V UF HKIN 1,5 # OF COPIES # OF COPIES 1# OF COPIES 3 'ExxonMobil,Alaska U U Attn: Lynda M. Yaskell and/or Lisa Boggs 3201 C Street, Suite 505 Anchorage, AK 99503 4State of Alaska - AOGCC 0 1 1 0 0 IAttn: Makana Bender 333 W. 7th Ave, Suite 100 ;Anchorage, Alaska 99501 J V1VR- VIV IJIUII VI VU IX ViIJ Attn: James Hyun 550 West 7th Avenue, Suite 802 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-I 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: David Itter J TOTALS FOR THIS PAGE: TOTALS FOR ALL PAGES: 0 3 4 0 0 0 3 4 0 0 1 BP North Slope. 0 0 0 0 0 EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 0 0 0 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 3-344 700 G Street Anchorage, AK 99510 3 'ExxonMobil,Alaska U U Attn: Lynda M. Yaskell and/or Lisa Boggs 3201 C Street, Suite 505 Anchorage, AK 99503 4State of Alaska - AOGCC 0 1 1 0 0 IAttn: Makana Bender 333 W. 7th Ave, Suite 100 ;Anchorage, Alaska 99501 J V1VR- VIV IJIUII VI VU IX ViIJ Attn: James Hyun 550 West 7th Avenue, Suite 802 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-I 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: David Itter J TOTALS FOR THIS PAGE: TOTALS FOR ALL PAGES: 0 3 4 0 0 0 3 4 0 0 rr..9 BAKER DEC 3 0 2016 PRINT DISTRIBUTION LIST HUGHES AOGCC COMPANY BP Exploration Alaska Inc WELL NAME C -31C FIELD Prudhoe Bay Unit COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. RiderQbakerhughes.com 216134 27 84 4 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LRDATA LOGGED2 1 t / l3/201-7 900 E. Benson Blvd. K BENDER Anchorage, Alaska 99508 to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE December 10, 2016 TODAYS DATE December 22, 2016 Revision STATUS Final Replacement: No Details: Requested by: COMPANY ADDRESS f FEDEX WILL NOT DELIVER TO P.O. BO* PERSON ATTENTION FIELD FINAL CD CD LOGS LOGS I (digital/image) Surveys I# (Final Surveys) 1#OF # OF PRINTS # OF PRIN 1 S # OF COPIES OF COPIES COPIE 4 4 1 1 BP North Slope 1 0 1 1 FOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. 0 1 1 Attn: Ricky Elgaricio PO Box 100360 Anchorage, AK 99510 3 ExxonMobil, Alaska 1 1 1 Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 41StateofAlaska -AOGCC 1 1 1 Attn: Makana Bender 1333 W. 7th Ave, Suite 100 ,Anchorage, Alaska 99501 5 [DNR - Division of Oil & Gas *** 0 1 1 1 1 Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 B Exploration (Alaska) Inc. Petrotechnical Data Center, LR24 900 E. Benson Blvd. ,Anchorage, Alaska 99508 Attn: Gerardo Cedillo TOTALS FOR THIS PAGE: 0 3 4 5 0 0 TOTALS FOR ALL PAGES: 0 3 4 5 0 0 DEC 3 0 Lulu- AOGCC North America - ALASKA - BP Prudhoe Bay PB C Pad C-31 C-31 C 500292177503 Design: C-31 C Final Survey Report 14 December, 2016 21 61 34 BAKER HUGHES Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 * OGP-UsaAK [4267*15864] Using Well Reference Point Map Zone: NAD27 * OGP-Usa AK / Alaska zone 4 [26734*1586, Using geodetic scale factor Site PB C Pad, TR -11-14 Site Position: Northing: 5,957,218.720 usft Latitude: 70° 17'22.367 N From: Map Easting: 662,550.030 usft Longitude: 148° 41'2.797 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.24 ' Well C-31, C-31 C-31 C BP FGaI JwI&b 5,959,422.000 usft Latitude: 70° 17'43.614 N +El -W 0.00 usft Easting: 664,508.000 usft Longitude: 148° 40'4.350 W Position Uncertainty 0.00 usft Wellhead Elevation: BAKER Ground Level: 37.28 usft Final Survey Report (usft) (usft) (°) Nof 33.08 0.00 0.00 70.00 HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft MD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad C-31 North Reference: True Well: C Survey Calculation Method: Minimum Curvature Wellbore: -31C Database: EDM RSK- Alaska PROD -ANCP1 Design: C -31C Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 * OGP-UsaAK [4267*15864] Using Well Reference Point Map Zone: NAD27 * OGP-Usa AK / Alaska zone 4 [26734*1586, Using geodetic scale factor Site PB C Pad, TR -11-14 Site Position: Northing: 5,957,218.720 usft Latitude: 70° 17'22.367 N From: Map Easting: 662,550.030 usft Longitude: 148° 41'2.797 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.24 ' Well C-31, C-31 C-31 C Well Position +N/ -S 0.00 usft Northing: 5,959,422.000 usft Latitude: 70° 17'43.614 N +El -W 0.00 usft Easting: 664,508.000 usft Longitude: 148° 40'4.350 W Position Uncertainty 0.00 usft Wellhead Elevation: 37.82 usft Ground Level: 37.28 usft Wellbore C-31 C Magnetics Model Name Sample Date Declination Dip Angle Field Strength BGGM2016 12/1/2016 18.16 81.01 57,558 Design C-31 C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 11,319.38 Vertical Section: Depth From (ND) +N/ -S +E/ -W Direction (usft) (usft) (usft) (°) 33.08 0.00 0.00 70.00 12/14/2016 10:45:27AM Page 2 COMPASS 5000.1 Build 81B BP rel R2 Obp Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C -31C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM R5K- Alaska PROD -ANCP1 Survey Survey Program Date 12/13/2016 From To (usft) (usft) Survey (Wellbore) Tool Name Description TVDSS 50.00 9,944.80 GCT (C-31 PBI) GCT -MS Schlumberger GCT multishot DLeg 9,987.00 11,319.38 2: MWD - Standard (C-31 A) MWD MWD - Standard (usft) 11,325.00 I 13,579.66 CTK MWD 3-1/4" (C -31C) MWD MWD - Standard Survey MD Inc Azl (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft (usft) 33.08 0.00 0.00 33.08 -37.82 0.00 0.00 5,959,422.000 664,508.000 0.00 0.00 50.00 0.17 196.21 50.00 -20.90 -0.02 -0.01 5,959,421.976 664,507.994 1.00 -0.01 63.05 0.12 170.21 63.05 -7.85 -0.06 -0.01 5,959,421.944 664,507.991 0.62 -0.03 76.15 0.12 166.66 76.15 5.25 -0.08 0.00 5,959,421.917 664,507.997 0.06 -0.031 89.15 0.10 168.20 89.15 18.25 -0.11 0.00 5,959,421.893 664,508.003 0.16 -0.04 102.05 0.10 168.52 102.05 31.15 -0.13 0.01 5,959,421.871 664,508.008 0.00 -0.04 115.00 0.08 168.89 115.00 44.10 -0.15 0.01 5,959,421.851 664,508.013 0.15 -0.04 127.80 0.07 168.46 127.80 56.90 -0.17 0.01 5,959,421,835 664,508.016 0.08 -0.04 140.60 0.07 168.30 140.60 69.70 -0.1.8 0.02 5,959,421.819 664,508.020 0.00 -0.05 153.40 0.08 168.59 153.40 82.50 -0.20 0.02 5,959,421.803 664,508.024 0.08 -0.0: 166.20 0.12 171.51 166.20 95.30 -0.22 0.02 5,959,421.781 664,508.028 0.31 -0.05 179.00 0.13 175.05 179.00 108.10 -0.25 0.03 5,959,421.753 664,508.032 0.10 -0.06 191.80 0.13 177.41 191.80 120.90 -0.28 0.03 5,959,421.724 664,508.034 0.04 -0.071 204.40 0.13 180.24 204.40 133.50 -0.30 0.03 5,959,421.696 664,508.035 0.05 -0.08 217.20 0.13 181.14 217.20 146.30 -0.33 0.03 5,959,421.667 664,508.036 0.02 -0.09 230.00 0.12 180.08 230.00 159.10 -0.36 0.03 5,959,421.639 664,508.036 0.08 -0.10 242.80 0.12 177.98 242.80 171.90 -0.39 0.03 5,959,421.612 664,508.037 0.03 -0.11 255.50 0.12 176.78 255.50 184.60 -0.42 0.03 5,959,421.586 664,508.039 0.02 -0.11 268.20 0.08 176.45 268.20 197.30 -0.44 0.03 5,959,421.564 664,508.041 0.31 -0.12 281.00 0.05 185.39 281.00 210.10 -0.45 0.03 5,959,421.549 664,508.041 0.25 -0.13 12/14/2016 10:45:27AM Page 3 COMPASS 5000.1 Build 81B FS ill BAKER HUGHES Survey BP Obp Final Survey Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C-31 C Survey Calculation Method: Minimum Curvature Design: C-31C Database: EDM RSK- Alaska PROD -ANCP1 FS ill BAKER HUGHES Survey MD Inc AzI (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 293.70 0.02 229.40 293.70 222.80 -0.46 0.03 5,959,421.542 664,508.039 0.30 0.13 306.50 0.02 269.75 306.50 235.60 -0.46 0.02 5,959,421.540 664,508.035 0.11 -0.1'. 319.30 0.03 290.82 319.30 248.40 -0.46 0.02 5,959,421.542 664,508.030 0.10 -0.14 332.00 0.05 332.65 332.00 261.10 -0.45 0.01 5,959,421.548 664,508.024 0.27 -0.14 344.80 0.13 9.26 344.80 273.90 -0.43 0.01 5,959,421.567 664,508.023 0.74 -0.14 357.50 0.40 17.89 357.50 286.60 -0.38 0.03 5,959,421.624 664,508.038 2.14 -0.10 370.20 0.78 16.41 370.20 299.30 -0.25 0.07 5,959,421.749 664,508.073 2.99 -0.02 382.80 1.27 16.21 382.80 311.90 -0.04 0.13 5,959,421.967 664,508.132 3.89 0.11 395.30 1.80 16.53 395.29 324.39 0.29 0.23 5,959,422.290 664,508.219 4.24 0.31 407.90 2.35 17.20 407.88 336.98 0.72 0.36 5,959,422.730 664,508.342 4.37 0.58 420.40 2.88 17.82 420.37 349.47 1.27 0.53 5,959,423.277 664,508.502 4.25 0.93 433.00 3.30 18.56 432.95 362.05 1.91 0.74 5,959,423.927 664,508.700 3.35 1.35 445.60 3.53 19.05 445.53 374.63 2.62 0.98 5,959,424.642 664,508.927 1.84 1.82 458.20 3.62 18.97 458.11 387.21 3.36 1.24 5,959,425.390 664,509.166 0.72 2.32 470.80 3.60 18.90 470.68 399.78 4.11 1.50 5,959,426.146 664,509.407 0.16 2.81 483.30 3.58 19.00 483.16 412.26 4.85 1.75 5,959,426.892 664,509.645 0.17 3.31 495.90 3.57 18.90 495.73 424.83 5.60 2.01 5,959,427.640 664,509.884 0.09 3.8 508.50 3.48 18.86 508.31 437.41 6.33 2.26 5,959,428.378 664,510.118 0.71 4.29 521.10 3.35 18.96 520.89 449.99 7.04 2.50 5,959,429.094 664,510.346 1.03 4.76 533.70 3.20 19.05 533.46 462.56 7.72 2.74 5,959,429.779 664,510.565 1.19 5.21 546.30 3.05 19.24 546.05 475.15 8.37 2.96 5,959,430.433 664,510.776 1.19 5.64 558.80 2.88 19.44 558.53 487.63 8.98 3.17 5,959,431.047 664,510.977 1.36 6.05 571.40 2.73 19.66 571.11 500.21 9.56 3.38 5,959,431.633 664,511.171 1.19 6.45 584.00 2.62 19.93 583.70 512.80 10.11 3.58 5,959,432.190 664,511.358 0.88 6.82 596.60 2.48 20.12 596.29 525.39 10.64 3.77 5,959,432.721 664,511.538 1.11 7.18 609.20 2.30 20.03 608.88 537.98 11.14 3.95 5,959,433.218 664,511.707 1.43 7.52 621.70 2.12 19.89 621.37 550.47 11.59 4.12 5,959,433.675 664,511.862 1.44 7.83 12114/2016 10:45.27AM Page 4 COMPASS 5000.1 Build 81B BP rfA.6 Obp Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C-31C Survey Calculation Method: Minimum Curvature Design: C-31C Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 634.20 1.98 19.70 633.86 562.96 12.01 4.27 5,959,434.099 664,512.004 1.12 8.V 646.80 1.87 19.62 646.45 575.55 12.41 4.41 5,959,434.500 664,512.138 0.87 8.39 659.40 1.75 19.72 659.05 588.15 12.78 4.54 5,959,434.878 664,512.264 0.95 8.64 671.90 1.63 19.57 671.54 600.64 13.13 4.67 5,959,435.228 664,512.380 0.96 8.88 684.50 1.55 19.46 684.14 613.24 13.46 4.79 5,959,435.560 664,512.489 0.64 9.10 697.10 1.47 19.43 696.73 625.83 13.77 4.90 5,959,435.875 664,512.593 0.63 9,31 709.70 1.40 19.56 709.33 638.43 14.07 5.00 5,959,436.175 664,512.692 0.56 9.51 722.30 1.33 19.73 721.92 651.02 14.35 5.10 5,959,436.459 664,512.786 0.56 9.70 734.90 1.27 19.57 734.52 663.62 14.62 5.20 5,959,436.731 664,512.877 0.48 9.89 747.50 1.20 19.73 747.12 676.22 14.88 5.29 5,959,436.988 664,512.962 0.56 10.06 760.10 1.13 20.02 759.72 688.82 15.12 5.38 5,959,437.231 664,513.044 0.56 10.22 772.70 1.08 20.21 772.31 701.41 15.35 5.46 5,959,437.461 664,513.123 0.40 10.38 785.20 1.03 20.26 784.81 713.91 15.56 5.54 5,959,437.679 664,513.198 0.40 10.53 797.80 0.97 20.15 797.41 726.51 15.77 5.62 5,959,437.887 664,513.269 0.48 10.67 810.30 0.88 19.92 809.91 739.01 15.96 5.68 5,959,438.078 664,513.334 0.72 10.80 822.80 0.83 19.61 822.41 751.51 16.13 5.75 5,959,438.255 664,513.393 0.40 10.9.• 835.30 0.78 19.65 834.90 764.00 16.30 5.81 5,959,438.421 664,513.449 0.40 11.03 847.90 0.75 19.51 847.50 776.60 16.46 5.86 5,959,438.581 664,513.501 0.24 11.14 860.50 0.73 19.29 860.10 789.20 16.61 5.92 5,959,438.736 664,513.552 0.16 11.24 873.10 0.68 19.30 872.70 801.80 16.76 5.97 5,959,438.883 664,513.600 0.40 11.34 885.70 0.62 19.00 885.30 814.40 16.89 6.02 5,959,439.019 664,513.644 0.48 11.43 898.20 0.60 18.56 897.80 826.90 17.02 6.06 5,959,439.146 664,513.684 0.16 11.51 910.80 0.55 18.04 910.40 839.50 17.14 6.10 5,959,439.267 664,513.721 0.40 11.59 923.30 0.50 17.61 922.90 852.00 17.25 6.13 5,959,439.376 664,513.754 0.40 11.66 935.90 0.47 17.40 935.50 864.60 17.35 6.17 5,959,439.479 664,513.784 0.24 11.73 948.50 0.45 17.12 948.10 877.20 17.45 6.20 5,959,439.576 664,513.812 0.16 11.79 961.00 0.43 16.68 960.60 889.70 17.54 6.22 5,959,439.668 664,513.838 0.16 11.85 1211412016 10:45.27AM Page 5 COMPASS 5000.1 Build 81B Obp Company North America - ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C-31C Design: C-31C BP Final Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well C-31 C-31A/B OKB @ 70.90usft C-31A/B OKB @ 70.90usft True Minimum Curvature EDM RSK-Alaska PROD -ANCP1 FGFA2 BAKER HUGHES Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (*1100usft) (usft) 973.60 0.40 16.45 973.20 902.30 17.63 6.25 5,959,439.757 664,513.862 0.24 11.90 986.20 0.37 16.23 985.80 914.90 17.71 6.27 5,959,439.838 664,513.884 0.24 11.9:. 998.70 0.37 14.59 998.30 927.40 17.78 6.29 5,959,439.916 664,513.903 0.D8 12.00 1,011.30 0.37 12.31 1,010.90 940.00 17.86 6.31 5,959,439.996 664,513.921 0.12 12.04 1,023.80 0.38 11.52 1,023.40 952.50 17.94 6.33 5,959,440.076 664,513.936 0.09 12.09 1,036.40 0.38 11.71 1,036.00 965.10 18.03 6.35 5,959,440.159 664,513.951 0.01 12.13 1,048.90 0.37 11.21 1,048.50 977.60 18.11 6.36 5,959,440.239 664,513.965 0.08 12.17 1,061.50 0.38 10.66 1,061.10 990.20 18.19 6.38 5,959,440.320 664,513.979 0.08 12.21 1,074.10 0.38 10.75 1,073.70 1,002.80 18.27 6.39 5,959,440.403 664,513.993 0.00 12.26 1,086.70 0.37 10.53 1,086.29 1,015.39 18.35 6.41 5,959,440.484 664,514.006 0.08 12.30 1,099.20 0.35 8.52 1,098.79 1,027.89 18.43 6.42 5,959,440.562 664,514.018 0.19 12.34 1,111.80 0.33 6.05 1,111.39 1,040.49 18.50 6.43 5,959,440.636 664,514.026 0.20 12.37 1,124.40 0.32 5.68 1,123.99 1,053.09 18.57 6.44 5,959,440.707 664,514.031 0.08 12.40 1,136.80 0.28 4.44 1,136.39 1,065.49 18.64 6.45 5,959,440.772 664,514.036 0.33 12.43 1,149.20 0.27 3.35 1,148.79 1,077.89 18.70 6.45 5,959,440.832 664,514.038 0.09 12.46 1,161.50 0.25 3.14 1,161.09 1,090.19 18.75 6.45 5,959,440.887 664,514.040 0.16 12.48 1,173.90 0.22 1.55 1,173.49 1,102.59 18.80 6.45 5,959,440.938 664,514.041 0.25 12.51 1,186.20 0.18 1.94 1,185.79 1,114.89 18.85 6.46 5,959,440.981 664, 514.042 0.33 12.51 1,198.60 0.23 33.57 1,198.19 1,127.29 18.89 6.47 5,959,441.022 664,514.055 0.98 12.54 1,210.90 0.62 80.20 1,210.49 1,139.59 18.92 6.55 5,959,441.055 664,514.134 3.99 12.63 1,223.30 1.35 101.40 1,222.89 1,151.99 18.90 6.76 5,959,441.042 664,514.343 6.48 12.82 1,235.70 2.13 107.27 1,235.29 1,164.39 18.80 7.12 5,959,440.953 664,514.709 6.44 13.12 1,248.00 2.90 109.45 1,247.57 1,176.67 18.63 7.63 5,959,440.793 664,515.224 6.31 13.55 1,260.40 3.75 110.32 1,259.95 1,189.05 18.39 8.31 5,959,440.563 664,515.905 6.87 14.10 1,272.80 4.47 110.29 1,272.32 1,201.42 18.08 9.14 5,959,440.273 664,516.745 5.81 14.78 1,285.20 4.95 109.74 1,284.68 1,213.78 17.73 10.10 5,959,439.945 664,517.709 3.89 15.56 1,297.50 5.35 108.87 1,296.93 1,226.03 17.37 11.14 5,959,439.604 664,518.759 3.31 16.41 12/14/2016 10:45:27AM Page 6 COMPASS 5000.1 Build 81B Opb BP FGA2 Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C -31C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft (usft) (usft) ('I100usft) (usft) 1,309.90 5.73 107.89 1,309.27 1,238.37 16.99 12.28 5,959,439.251 664,519.903 3.16 17.3 1,322.30 6.13 106.81 1,321.60 1,250.70 16.61 13.50 5,959,438.897 664,521.134 3.35 18.37 1,334.70 6.52 105.64 1,333.93 1,263.03 16.23 14.81 5,959,438.544 664,522.453 3.31 19.47 1,347.00 6.90 104.37 1,346.14 1,275.24 15.85 16.20 5,959,438.203 664,523.849 3.32 20.65 1,359.40 7.28 103.07 1,358.45 1,267.55 15.49 17.69 5,959,437.873 664,525.344 3.33 21.92 1,371.80 7.67 101.89 1,370.74 1,299.84 15.14 19.26 5,959,437.560 664,526.926 3.38 23.28 1,384.10 8.05 100.90 1,382.93 1,312.03 14.81 20.91 5,959,437.264 664,528.582 3.28 24.72 1,396.50 8.45 100.07 1,395.20 1,324.30 14.49 22.66 5,959,436.979 664,530.338 3.37 26.25 1,408.90 8.83 99.38 1,407.46 1,336.56 14.17 24.50 5,959,436.705 664,532.180 3.18 27.87 1,421.30 9.15 98.80 1,419.71 1,348.81 13.87 26.41 5,959,436.441 664,534.099 2.68 29.56 1,433.70 9.37 98.38 1,431.95 1,361.05 13.57 28.38 5,959,436.186 664,536.078 1.86 31.31 1,446.00 9.45 98.24 1,444.08 1,373.18 13.28 30.37 5,959,435.939 664,538.074 0.68 33.08 1,458.40 9.48 98.29 1,456.31 1,385.41 12.99 32.39 5,959,435.690 664,540.098 0.25 34.88 1,470.80 9.45 98.25 1,468.54 1,397.64 12.69 34.41 5,959,435.441 664,542.121 0.25 36.68 1,483.20 9.35 98.23 1,480.78 1,409.88 12.40 36.41 5,959,435,195 664,544.131 0.81 38.46 1,495.60 9.17 98.36 1,493.01 1,422.11 12.11 38.39 5,959,434.950 664,546.112 1.46 40.2 1,508.00 8.97 98.55 1,505.26 1,434.36 11.83 40.32 5,959,434.705 664,548.051 1.63 41.94 1,520.30 8.80 98.79 1,517.41 1,446.51 11.54 42.20 5,959,434.460 664,549.935 1 A 43.60 1,532.70 8.68 98.92 1,529.67 1,458.77 11.25 44.06 5,959,434.211 664,551.802 0.98 45.25 1,545.10 8.63 98.79 1,541.93 1,471.03 10.96 45.91 5,959,433.964 664,553.652 0.43 46.89 1,557.60 8.58 98.38 1,554.29 1,483.39 10.68 47.75 5,959,433.725 664,555.506 0.63 48.53 1,570.00 8.58 97.51 1,566.55 1,495.65 10.43 49.59 5,959,433.510 664,557.344 1.05 50.16 1,582.40 8.67 96.21 1,578.81 1,507.91 10.21 51.43 5,959,433.328 664,559.194 1.73 51.82 1,594.80 8.77 94.67 1,591.06 1,520.16 10.03 53.30 5,959,433.191 664,561.069 2.05 53.52 1,607.20 8.87 92.91 1,603.32 1,532.42 9.90 55.20 5,959,433.107 664,562.968 2.32 55.26 1,619.60 8.98 90.83 1,615.57 1,544.67 9.84 57.12 5,959,433.087 664,564.891 2.75 57.04 1,632.00 9.13 88.32 1,627.81 1,556.91 9.85 59.07 5,959,433.144 664,566.841 3.41 58.88 12114/2016 10:45:27AM Page 7 COMPASS 5000.1 Build BIB rias BAKER HUGHES Survey BP Obp Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKS @ 70.90usft Site: PB C Pad MD Reference: C-31AIB OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C-31C Survey Calculation Method: Minimum Curvature DLeg Database: EDM RSK- Alaska PROD -ANCP1 Design: C-31C V) rias BAKER HUGHES Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 1,644.40 9.33 85.53 1,640.05 1,569.15 9.96 61.06 5,959,433.295 664,568.824 3.95 60.79 1,656.80 9.58 83.06 1,652.28 1,581.38 10.16 63.09 5,959,433.542 664,570.845 3.84 62.7 1,669.20 9.95 81.40 1,664.50 1,593.60 10.45 65.17 5,959,433.873 664,572.921 3.75 64.81 1,681.60 10.38 80.44 1,676.71 1,605.81 10.80 67.33 5,959,434.266 664,575.074 3.73 66.96 1,693.40 10.82 79.97 1,688.31 1,617.41 11.16 69.47 5,959,434.682 664,577.204 3.80 69.10 1,696.70 10.92 79.95 1,691.55 1,620.65 11.27 70.08 5,959,434.804 664,577.814 3.03 69.71 1,722.60 11.20 80.24 1,716.97 1,646.07 12.13 74.98 5,959,435.765 664,582.689 1.10 74.60 1,763.90 10.78 82.32 1,757.51 1,686.61 13.32 82.76 5,959,437.131 664,590.441 1.40 82.32 1,805.10 10.25 86.30 1,798.02 1,727.12 14.08 90.23 5,959,438.046 664,597.899 2.18 89.61 1,846.30 9.95 90.00 1,838.58 1,767.68 14.31 97.45 5,959,438.440 664,605.109 1.73 96.47 1,887.20 10.08 92.39 1,878.86 1,807.96 14.16 104.56 5,959,438.447 664,612.220 1.06 103.10 1,927.50 10.83 93.82 1,918.49 1,847.59 13.76 111.86 5,959,438.207 664,619.528 1.97 109.82 1,967.60 11.97 95.25 1,957.80 1,886.90 13.13 119.76 5,959,437.749 664,627.439 2.93 117.03 2,007.60 13.03 96.80 1,996.85 1,925.95 12.22 128.37 5,959,437.024 664,636.065 2.78 124.81 2,047.50 13.87 97.90 2,035.65 1,964.75 11.03 137.58 5,959,436.036 664,645.291 2.20 133.05 2,087.40 14.88 98.49 2,074.30 2,003.40 9.61 147.38 5,959,434.837 664,655.124 2.56 141.78 2,127.40 16.27 98.55 2,112.83 2,041.93 8.02 158.00 5,959,433.479 664,665.776 3.48 151.2 2,167.40 17.85 98.23 2,151.07 2,080.17 6.31 169.61 5,959,432.023 664,677.419 3.96 161.54 2,207.30 19.47 97.82 2,188.87 2,117.97 4.53 182.25 5,959,430.520 664,690.095 4.07 172.81 2,247.20 20.83 97.47 2,226.33 2,155.43 2.71 195.87 5,959,428.991 664,703.753 3.42 184.99 2,287.10 22.00 97.28 2,263.48 2,192.58 0.84 210.32 5,959,427.439 664,718.237 2.94 197.92 2,327.00 23.13 97.11 2,300.32 2,229.42 -1.08 225.51 5,959,425.855 664,733.465 2.84 211.54 2,366.90 24.42 97.00 2,336.83 2,265.93 -3.06 241.47 5,959,424.230 664,749.466 3.23 225.87 2,406.80 25.93 96.88 2,372.94 2,302.04 -5.11 258.32 5,959,422.549 664,766.354 3.79 241.00 2,446.80 27.53 96.70 2,408.67 2,337.77 -7.23 276.19 5,959,420.814 664,784.260 4.01 257.06 2,486.70 29.05 96.41 2,443.80 2,372.90 -9.39 294.97 5,959,419.068 664,803.087 3.83 273.97 2,526.60 30.33 95.85 2,478.46 2,407.56 -11.50 314.62 5,959,417.391 664,822.777 3.28 291.72 12/14/2016 10:45.27AM Page 8 COMPASS 5000.1 Build 819 ObpBPUr9 Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C -31C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) ND TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (I (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 2,566.50 31.72 95.10 2,512.65 2,441.75 -13.46 335.09 5,959,415.880 664,843.284 3.62 310.2' 2,606.40 33.35 94.48 2,546.29 2,475.39 -15.25 356.48 5,959,414.559 664,864.699 4.17 329.76 2,645.90 34.95 93.91 2,578.98 2,508.08 -16.87 378.59 5,959,413.424 664,886.842 4.13 349.99 2,685.20 36.47 93.14 2,610.89 2,539.99 -18.27 401.48 5,959,412.518 664,909.760 4.03 371.02 2,724.80 37.92 92.47 2,642.43 2,571.53 -19.44 425.39 5,959,411.873 664,933.688 3.80 393.09 2,766.10 39.50 91.94 2,674.66 2,603.76 -20.44 451.20 5,959,411.446 664,959.510 3.91 417,00 2,807.60 40.20 91.57 2,706.52 2,635.62 -21.25 477.78 5,959,411.214 664,986.099 1.78 441.70 2,828.12 40.18 91.60 2,722.20 2,651.30 -21.62 491.02 5,959,411.138 664,999.339 0.15 454.01 13 3/8" 2,849.10 40.15 91.63 2,738.23 2,667.33 -22.00 504.54 5,959,411.053 665,012.869 0.15 466.59 2,890.70 40.02 91.82 2,770.06 2,699.16 -22.80 531.32 5,959,410.833 665,039.654 0.43 491.48 2,932.20 39.90 91.96 2,801.87 2,730.97 -23.68 557.96 5,959,410.537 665,066.304 0.36 516.21 2,973.90 40.18 92.30 2,833.79 2,762.89 -24.68 584.77 5,959,410.127 665,093.125 0.85 541.06 3,015.60 40.73 92.97 2,865.52 2,794.62 -25.92 611.79 5,959,409.474 665,120.172 1.68 566.03 3,057.40 41.23 94.30 2,897.08 2,826.18 -27.66 639.15 5,959,408.334 665,147.557 2.41 591.14 3,099.00 41.78 96.31 2,928.23 2,857.33 -30.21 666.60 5,959,406.384 665,175.051 3.46 616.06 3,140.50 42.85 97.65 2,958.92 2,888.02 -33.61 694.32 5,959,403.594 665,202.846 3.37 640.96 3,181.90 44.22 97.68 2,988.93 2,918.03 -37.42 722.59 5,959,400.410 665,231.181 3.31 666.21 3,223.50 45.40 97.22 3,018.45 2,947.55 -41.22 751.65 5,959,397.247 665,260.325 2.94 692.23 3,265.20 45.93 96.89 3,047.59 2,976.69 -44.88 781.26 5,959,394.233 665,289.997 1.39 718.79 3,307.00 46.07 96.88 3,076.62 3,005.72 -48.48 811.11 5,959,391.283 665,319.918 0.34 745.61 3,348.70 46.28 96.96 3,105.50 3,034.60 -52.11 840.97 5,959,388.313 665,349.854 0.52 772.43 3,389.90 46.35 97.00 3,133.96 3,063.06 -55.73 870.55 5,959,385.341 665,379.497 0.18 798.98 3,431.00 46.38 97.04 3,162.32 3,091.42 -59.36 900.07 5,959,382.353 665,409.090 0.10 825.48 3,472.10 46.38 97.04 3,190.67 3,119.77 -63.01 929.60 5,959,379.353 665,438.690 0.00 851.99 3,513.20 46.45 97.06 3,219.01 3,148.11 -66.67 959.14 5,959,376.347 665,468.307 0.17 878.50 3,554.20 46.57 97.13 3,247.23 3,176.33 -70.34 988.66 5,959,373.320 665,497.895 0.32 904.98 12/14/2016 10:45.27AM Page 9 COMPASS 5000.1 Build 81B 1211412016 10:45:27AM Page 10 COMPASS 5000.1 Build BIB BP rias Obp Final Survey Report BAKER Survey HUGHES Company: North Amenca - ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Azi (azimuth) Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Northing Well: C-31 North Reference: True V) Wellbore: C-31 C Survey Calculation Method: Minimum Curvature (usft) Design: C-31C Database: EDM RSK- Alaska PRO D-ANCP1 3,595.30 1211412016 10:45:27AM Page 10 COMPASS 5000.1 Build BIB Survey MD Inc Azi (azimuth) ND TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 3,595.30 46.57 97.18 3,275.48 3,204.58 -74.06 1,018.28 5,959,370.252 665,527.583 0.09 931.54 3,636.40 46.60 97.19 3,303.73 3,232.83 -77.79 1,047.90 5,959,367.167 665,557.276 0.08 958.0 3,677.50 46.73 97.21 3,331.93 3,261.03 -81.54 1,077.56 5,959,364.071 665,587.007 0.32 984.68 3,718.60 46.68 97.25 3,360.12 3,289.22 -85.30 1,107.23 5,959,360.957 665,616.756 0.14 1,011.28 3,759.70 46.78 97.27 3,388.29 3,317.39 -89.08 1,136.92 5,959,357.826 665,646.516 0.25 1,037.88 3,800.80 46.93 97.30 3,416.39 3,345.49 -92.89 1,166.66 5,959,354.675 665,676.336 0.37 1,064.54 3,841.80 46.85 97.39 3,444.41 3,373.51 -96.71 1,196.35 5,959,351.500 665,706.097 0.25 1,091.12 3,882.80 46.95 97.50 3,472.43 3,401.53 -100.59 1,226.03 5,959,348.272 665,735.857 0.31 1,117.69 3,923.90 47.13 97.57 3,500.44 3,429.54 -104.54 1,255.85 5,959,344.981 665,765.752 0.46 1,144.36 3,965.00 47.22 97.68 3,528.38 3,457.48 -108.54 1,285.73 5,959,341.637 665,795.708 0.29 1,171.07 4,006.00 47.45 97.73 3,556.16 3,485.26 -112.58 1,315.61 5,959,338.250 665,825.663 0.57 1,197.76 4,047.20 47.77 97.76 3,583.94 3,513.04 -116.68 1,345.76 5,959,334.810 665,855.895 0.78 1,224.69 4,088.00 47.82 97.83 3,611.35 3,540.45 -120.78 1,375.70 5,959,331.368 665,885.919 0.18 1,251.43 4,128.30 47.62 97.88 3,638.46 3,567.56 -124.85 1,405.24 5,959,327.940 665,915.536 0.50 1,277.79 4,168.70 47.87 97.92 3,665.62 3,594.72 -128.96 1,434.86 5,959,324.480 665,945.235 0.62 1,304.22 4,209.20 48.05 97.90 3,692.75 3,621.85 -133.10 1,464.65 5,959,320.994 665,975.109 0.45 1,330.80 4,249.70 47.85 97.86 3,719.87 3,648.97 -137.23 1,494.44 5,959,317.524 666,004.980 0.50 1,357.3 4,290.00 48.05 97.89 3,746.86 3,675.96 -141.33 1,524.08 5,959,314.074 666,034.703 0.50 1,383.83 4,330.50 48.30 97.93 3,773.87 3,702.97 -145.48 1,553.97 5,959,310.576 666,064.678 0.62 1,410.50 4,370.90 48.53 97.94 3,800.69 3,729.79 -149.65 1,583.90 5,959,307.061 666,094.689 0.57 1,437.20 4,411.40 48.58 97.93 3,827.49 3,756.59 -153.84 1,613.97 5,959,303.529 666,124.839 0.12 1,464.02 4,451.80 48.60 97.91 3,854.22 3,783.32 -158.02 1,643.98 5,959,300.012 666,154.932 0.06 1,490.79 4,492.30 48.75 97.92 3,880.96 3,810.06 -162.21 1,674.11 5,959,296.485 666,185.139 0.37 1,517.67 4,532.80 48.87 97.94 3,907.63 3,836.73 -166.41 1,704.29 5,959,292.942 666,215.408 0.30 1,544.59 4,573.30 49.17 97.97 3,934.19 3,863.29 -170.64 1,734.57 5,959,289.375 666,245.772 0.74 1,571.60 4,613.80 49.50 97.96 3,960.58 3,889.68 -174.90 1,765.00 5,959,285.785 666,276.280 0.82 1,598.74 4,654.40 49.73 97.93 3,986.89 3,915.99 -179.17 1,795.63 5,959,282.182 666,306.992 0.57 1,626.06 1211412016 10:45:27AM Page 10 COMPASS 5000.1 Build BIB Ob BP F/,k2 p Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C-31 C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 4,695.00 49.58 97.93 4,013.17 3,942.27 -183.44 1,826.27 5,959,278.585 666,337.724 0.37 1,653.3' 4,735.60 49.32 97.91 4,039.57 3,968.67 -187.69 1,856.83 5,959,275.004 666,368.363 0.64 1,680.65 4,776.00 49.10 97.94 4,065.96 3,995.06 -191.91 1,887.12 5,959,271.451 666,398.741 0.55 1,707.68 4,815.60 48.90 98.00 4,091.94 4,021.04 -196.05 1,916.72 5,959,267.956 666,428.420 0.52 1,734.07 4,855.10 49.00 97.96 4,117.88 4,046.98 -200.19 1,946.22 5,959,264.468 666,458.001 0.26 1,760.38 4,894.80 49.27 97.82 4,143.85 4,072.95 -204.31 1,975.96 5,959,260.999 666,487.821 0.73 1,786.92 4,934.60 49.57 97.66 4,169.74 4,098.84 -208.38 2,005.91 5,959,257.585 666,517.854 0.81 1,813.67 4,974.50 49.65 97.50 4,195.60 4,124.70 -212.39 2,036.04 5,959,254.237 666,548.057 0.37 1,840.61 5,014.30 49.53 97.29 4,221.40 4,150.50 -216.29 2,066.09 5,959,250.995 666,578.185 0.50 1,867.51 5,054.00 49.48 97.11 4,247.18 4,176.28 -220.07 2,096.04 5,959,247.868 666,608.211 0.37 1,894.37 5,093.80 49.50 96.97 4,273.03 4,202.13 -223.78 2,126.07 5,959,244.817 666,638.315 0.27 1,921.32 5,133.70 49.60 96.83 4,298.92 4,228.02 -227.43 2,156.22 5,959,241.831 666,668.528 0.37 1,948.39 5,173.50 49.75 96.70 4,324.87 4,253.77 -231.01 2,186.35 5,959,238.917 666,698.729 0.45 1,975.49 5,213.30 49.77 96.61 4,350.38 4,279.48 -234.53 2,216.52 5,959,236.058 666,,728.973 0.18 2,002.64 5,253.10 49.85 96.53 4,376.07 4,305.17 -238.00 2,246.73 5,959,233.241 666,759.243 0.25 2,029.83 5,293.00 49.95 96.44 4,401.77 4,330.87 -241.45 2,277.05 5,959,230.459 666,789.635 0,30 2,057.1' 5,332.80 49.90 96.35 4,427.39 4,356.49 -244.84 2,307.32 5,959,227.730 666,819.965 0.21 2,084.43 5,372.60 49.85 96.29 4,453.04 4,382.14 -248.19 2,337.57 5,959,225.043 666,850.277 0.17 2,111.71 5,412.50 49.97 96.26 4,478.74 4,407.84 -251.53 2,367.91 5,959,222.372 666,880.682 0.31 2,139.08 5,452.30 50.03 96.23 4,504.32 4,433.42 -254.85 2,398.22 5,959,219.720 666,911.053 0.16 2,166.42 5,491.80 49.87 96.23 4,529.74 4,458.84 -258.13 2,428.27 5,959,217.097 666,941.174 0.41 2,193.55 5,530.90 49.82 96.28 4,554.95 4,484.05 -261.38 2,457.98 5,959,214.492 666,970.942 0.16 2,220.35 5,570.10 49.87 96.34 4,580.23 4,509.33 -264.68 2,487.76 5,959,211.852 667,000.784 0.17 2,247.20 5,609.40 49.78 96.44 4,605.58 4,534.68 -268.02 2,517.60 5,959,209.164 667,030.690 0.30 2,274.10 5,648.50 49.82 96.57 4,630.82 4,559.92 -271.40 2,547.27 5,959,206.431 667,060.427 0.27 2,300.83 5,687.70 50.03 96.65 4,656.06 4,585.16 -274.86 2,577.07 5,959,203.632 667,090.290 0.56 2,327.65 5,726.90 50.22 96.74 4,681.19 4,610.29 -278.36 2,606.95 5,959,200.779 667,120.236 0.52 2,354.52 12/14/2016 10.45:27AM Page 11 COMPASS 5000.1 Build 81B Survey BP reA.a Obp Final Survey Report BAKER MD Inc Azi (azimuth) HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well C-31 Easting Project: Prudhoe Bay ND Reference: C-31A/B OKB @ 70.90usft (°) Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft (usft) Well: C-31 North Reference: True 50.25 Wellbore: C-31C Survey Calculation Method: Minimum Curvature 2,636.95 5,959,197.879 667,150.303 Database: EDM RSK-Alaska PROD -ANCP1 5,805.40 Design: C-31C 4,731.37 4,660.47 -285.48 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 5,766.20 50.25 96.79 4,706.33 4,635.43 -281.92 2,636.95 5,959,197.879 667,150.303 0.12 2,381.50 5,805.40 50.33 96.78 4,731.37 4,660.47 -285.48 2,666.89 5,959,194.972 667,180.317 0.21 2,408.4 5,844.70 50.52 96.78 4,756.41 4,685.51 -289.06 2,696.97 5,959,192.055 667,210.466 0.48 2,435.46 5,883.70 50.43 96.82 4,781.23 4,710.33 -292.62 2,726.84 5,959,189.148 667,240.406 0.24 2,462.31 5,922.60 50.30 96.96 4,806.04 4,735.14 -296.22 2,756.58 5,959,186.207 667,270.216 0.43 2,489.03 5,961.60 50.30 97.06 4,830.95 4,760.05 -299.88 2,786.37 5,959,183.198 667,300.070 0.20 2,515.76 6,000.80 50.35 97.00 4,855.98 4,785.08 -303.57 2,816.31 5,959,180.161 667,330.086 0.17 2,542.64 6,039.90 50.48 96.94 4,880.90 4,810.00 -307.23 2,846.22 5,959,177.161 667,360.068 0.35 2,569.50 6,079.20 50.68 96.93 4,905.85 4,834.95 -310.89 2,876.36 5,959,174.156 667,390.276 0.51 2,596.56 6,118.50 50.95 96.97 4,930.68 4,859.78 -314.58 2,906.60 5,959,171.132 667,420.585 0.69 2,623.72 6,157.80 51.13 97.05 4,955.39 4,884.49 -318.31 2,936.93 5,959,168.068 667,450.988 0.48 2,650.94 6,196.40 51.20 97.13 4,979.60 4,908.70 -322.02 2,966.77 5,959,165.011 667,480.898 0.24 2,677.71 6,235.00 51.17 97.28 5,003.79 4,932.89 -325.79 2,996.60 5,959,161.893 667,510.810 0.31 2,704.46 6,273.40 50.68 97.51 5,028.00 4,957.10 -329.63 3,026.17 5,959,158.704 667,540.447 1.36 2,730.93 6,311.50 50.32 97.74 5,052.23 4,981.33 -333.53 3,055.31 5,959,155.443 667,569.663 1.05 2,756.98 6,349.80 50.30 97.86 5,076.69 5,005.79 -337.53 3,084.51 5,959,152.083 667,598.941 0.25 2,783.05 6,388.30 50.40 97.91 5,101.26 5,030.36 -341.60 3,113.87 5,959,148.660 667,628.384 0.28 2,809.2 6,426.80 50.57 98.02 5,125.76 5,054.86 -345.71 3,143.28 5,959,145.190 667,657.879 0.49 2,835.48 6,465.30 50.77 98.19 5,150.16 5,079.26 -349.91 3,172.77 5,959,141.638 667,687.445 0.62 2,861.75 6,503.80 51.08 98.33 5,174.42 5,103.52 -354.20 3,202.34 5,959,137.992 667,717.108 0.85 2,888.07 6,542.30 51.23 98.35 5,198.57 5,127.67 -358.55 3,232.01 5,959,134.294 667,746.862 0.39 2,914.47 6,580.70 51.20 98.22 5,222.63 5,151.73 -362.87 3,261.63 5,959,130.630 667,776.568 0.28 2,940.83 6,619.10 51.25 98.18 5,246.67 5,175.77 -367.14 3,291.26 5,959,127.010 667,806.283 0.15 2,967.21 6,657.60 51.32 98.28 5,270.75 5,199.85 -371.44 3,321.00 5,959,123.362 667,836.099 0.27 2,993.68 6,696.10 51.23 98.31 5,294.84 5,223.94 -375.77 3,350.72 5,959,119.680 667,865.907 0.24 3,020.12 6,734.60 50.97 98.39 5,319.02 5,248.12 -380.12 3,380.36 5,959,115.979 667,895.637 0.69 3,046.49 6,773.10 50.60 98.49 5,343.36 5,272.46 -384.50 3,409.87 5,959,112.248 667,925.230 0.98 3,072.72 12/14/2016 10:45:27AM Page 12 COMPASS 5000.1 Build 81B b BP rl/aw pFinal Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C-31 C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) V) (') (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 6,811.60 50.30 98.49 5,367.87 5,296.97 -388.88 3,439.23 5,959,108.510 667,954.678 0.78 3,098.8 6,849.70 50.05 98.26 5,392.27 5,321.37 -393.14 3,468.18 5,959,104.883 667,983.711 0.80 3,124.56 6,887.60 49.93 98.08 5,416.64 5,345.74 -397.27 3,496.91 5,959,101.387 668,012.527 0.48 3,150.15 6,925.50 49.93 98.09 5,441.04 5,370.14 -401.35 3,525.63 5,959,097.938 668,041.322 0.02 3,175.74 6,963.30 49.97 98.16 5,465.36 5,394.46 -405.44 3,554.27 5,959,094.477 668,070.047 0.18 3,201.25 7,001.20 49.88 98.18 5,489.76 5,418.86 -409.56 3,582.98 5,959,090.985 668,098.836 0.24 3,226.82 7,039.00 49.53 98.25 5,514.20 5,443.30 -413.68 3,611.51 5,959,087.491 668,127.452 0.94 3,252.23 7,076.90 49.15 98.43 5,538.90 5,468.00 -417.85 3,639.96 5,959,083.945 668,155.981 1.07 3,277.53 7,114.70 48.93 98.52 5,563.68 5,492.78 -422.06 3,668.19 5,959,080.357 668,184.298 0.61 3,302.62 7,152.70 48.83 98.50 5,588.67 5,517.77 -426.29 3,696.51 5,959,076.742 668,212.693 0.27 3,327.78 7,190.50 48.72 98.47 5,613.58 5,542.68 -430.49 3,724.62 5,959,073.164 668,240.896 0.30 3,352.77 7,228.40 48.57 98.47 5,638.62 5,567.72 -434.68 3,752.76 5,959,069.591 668,269.117 0.40 3,377.78 7,266.40 48.40 98.36 5,663.81 5,592.91 -438.84 3,780.91 5,959,066.044 668,297.347 0.50 3,402.80 7,304.30 48.28 98.21 5,689.00 5,618.10 -442.92 3,808.93 5,959,062.578 668,325.447 0.43 3,427.74 7,342.20 48.13 98.02 5,714.26 5,643.36 -446.91 3,836.90 5,959,059.203 668,353.499 0.54 3,452.66 7,380.20 47.95 97.90 5,739.67 5,668.77 -450.82 3,864.89 5,959,055.904 668,381.561 0.53 3,477.6' 7,418.10 47.83 97.90 5,765.08 5,694.18 -454.69 3,892.74 5,959,052.650 668,409.486 0.32 3,502.46 7,456.00 47.83 97.92 5,790.52 5,719.62 -458.55 3,920.56 5,959,049.394 668,437.385 0.04 3,527.29 7,493.90 47.78 97.96 5,815.98 5,745.08 -462.43 3,948.37 5,959,046.125 668,465.271 0.15 3,552.09 7,531.10 47.90 97.98 5,840.95 5,770.05 -466.26 3,975.68 5,959,042.901 668,492.655 0.33 3,576.45 7,568.10 47.95 98.00 5,865.74 5,794.84 -470.07 4,002.88 5,959,039.680 668,519.928 0.14 3,600.70 7,604.90 47.80 98.01 5,890.43 5,819.53 -473.87 4,029.90 5,959,036.472 668,547.030 0.41 3,624.80 7,642.00 47.78 98.05 5,915.35 5,844.45 -477.71 4,057.11 5,959,033.230 668,574.316 0.10 3,649.05 7,679.20 47.77 98.09 5,940.35 5,869.45 -481.58 4,084.39 5,959,029.961 668,601.667 0.08 3,673.36 7,716.30 47.92 98.15 5,965.25 5,894.35 -485.46 4,111.62 5,959,026.673 668,628.971 0.42 3,697.62 7,753.40 47.98 98.25 5,990.10 5,919.20 -489.39 4,138.88 5,959,023.342 668,656.316 0.26 3,721.90 7,790.50 47.75 98.27 6,014.99 5,944.09 -493.35 4,166.11 5,959,019.986 668,683.621 0.62 3,746.13 1211412016 10 45:27AM Page 13 COMPASS 5000.1 Build SIB BP F/.as Obp Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C-31 C Survey Calculation Method: Minimum Curvature Design: C-31 C Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (") V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 7,827.70 47.75 98.33 6,040.00 5,969.10 -497.32 4,193.36 5,959,016.609 668,710.947 0.12 3,770.37 7,864.80 47.90 98.41 6,064.91 5,994.01 -501.32 4,220.56 5,959,013.203 668,738.228 0.43 3,794.5-1 7,902.00 47.87 98.44 6,089.86 6,018.96 -505.37 4,247.86 5,959,009.759 668,765.605 0.10 3,818.83 7,939.10 47.78 98.48 6,114.77 6,043.87 -509.41 4,275.05 5,959,006.310 668,792.881 0.26 3,843.01 7,976.20 47.73 98.59 6,139.71 6,068.81 -513.49 4,302.21 5,959,002.830 668,820.122 0.26 3,867.13 8,013.29 47.77 98.69 6,164.65 6,093.75 -517.61 4,329.36 5,958,999.301 668,847.347 0.23 3,891.23 8,050.50 47.82 98.74 6,189.64 6,118.74 -521.79 4,356.60 5,958,995.722 668,874.675 0.17 3,915.40 8,087.70 47.77 98.78 6,214.63 6,143.73 -525.98 4,383.83 5,958,992.123 668,901.992 0.16 3,939.56 8,124.80 47.58 98.83 6,239.61 6,168.71 -530.18 4,410.94 5,958,988.519 668,929.182 0.52 3,963.59 8,161.50 47.38 98.86 6,264.42 6,193.52 -534.34 4,437.67 5,958,984.946 668,955.993 0.55 3,987.29 8,198.10 47.28 98.86 6,289.23 6,218.33 -538.49 4,464.26 5,958,981.384 668,982.665 0.27 4,010.86 8,234.60 47.10 98.83 6,314.03 6,243.13 -542.60 4,490.72 5,958,977.847 669,009.205 0.50 4,034.31 8,271.10 46.88 98.82 6,338.93 6,268.03 -546.70 4,517.09 5,958,974.331 669,035.661 0.60 4,057.69 8,307.70 46.68 98.88 6,363.99 6,293.09 -550.80 4,543.44 5,958,970.806 669,062.096 0.56 4,081.06 8,344.10 46.38 98.95 6,389.03 6,318.13 -554.90 4,569.54 5,958,967.284 669,088.275 0.84 4,104.18 8,380.60 46.12 99.01 6,414.27 6,343.37 -559.01 4,595.59 5,958,963.740 669,114.400 0.72 4,127.24 8,417.20 45.90 99.06 6,439.69 6,368.79 -563.15 4,621.59 5,958,960.175 669,140.489 0.61 4,150.2, 8,453.70 45.82 99.09 6,465.11 6,394.21 -567.28 4,647.46 5,958,956.611 669,166.437 0.23 4,173.16 8,490.20 45.82 99.14 6,490.55 6,419.65 -571.43 4,673.30 5,958,953.032 669,192.365 0.10 4,196.03 8,526.80 45.80 99.21 6,516.06 6,445.16 -575.61 4,699.21 5,958,949.415 669,218.356 0.15 4,218.94 8,563.30 45.75 99.27 6,541.52 6,470.62 -579.81 4,725.03 5,958,945.782 669,244.257 0.18 4,241.77 8,599.90 45.72 99.31 6,567.07 6,496.17 -584.04 4,750.89 5,958,942.118 669,270.208 0.11 4,264.63 8,636.50 45.65 99.41 6,592.63 6,521.73 -588.30 4,776.73 5,958,938.426 669,296.132 0.27 4,287.45 8,673.00 45.50 99.56 6,618.18 6,547.28 -592.60 4,802.44 5,958,934.694 669,321.929 0.51 4,310.14 8,709.60 45.35 99.67 6,643.87 6,572.97 -596.95 4,828.15 5,958,930.904 669,347.721 0.46 4,332.81 8,746.20 45.25 99.74 6,669.61 6,598.71 -601.34 4,853.79 5,958,927.081 669,373.452 0.31 4,355.40 8,782.70 45.23 99.77 6,695.32 6,624.42 -605.73 4,879.33 5,958,923.250 669,399.083 0.08 4,377.90 12114/2016 10:45:27AM Page 14 COMPASS 5000.1 Build 81B 10*� b BP Has Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31AIB OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C-31 C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Aft (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft (usft) 8,818.60 45.18 99.78 6,720.61 6,649.71 -610.05 4,904.44 5,958,919.475 669,424.276 0.14 4,400.0 8,854.60 45.07 99.84 6,746.01 6,675.11 -614.40 4,929.58 5,958,915.680 669,449,502 0.33 4,422.15 8,890.50 44.97 99.92 6,771.39 6,700.49 -618.76 4,954.59 5,958,911.872 669,474.607 0.32 4,444.17 8,926.10 44.87 100.00 6,796.59 6,725.69 -623.10 4,979.35 5,958,908.067 669,499.453 0.32 4,465.95 8,961.60 44.80 100.08 6,821.77 6,750.87 -627.47 5,004.00 5,958,904.244 669,524.188 0.25 4,487.62 8,997.30 44.72 100.18 6,847.12 6,776.22 -631.89 5,028.75 5,958,900.366 669,549.023 0.30 4,509.36 9,033.20 44.58 100.31 6,872.66 6,801.76 -636.38 5,053.57 5,958,896.424 669,573.941 0.47 4,531.15 9,069.00 44.47 100.43 6,898.18 6,827.28 -640.89 5,078.27 5,958,892.447 669,598.726 0.39 4,552.81 9,104.89 44.37 100.53 6,923.82 6,852.92 -645.46 5,102.97 5,958,888.420 669,623.519 0.34 4,574.46 9,140.80 44.28 100.63 6,949.50 6,878.60 -650.07 5,127.63 5,958,884.354 669,648.277 0.32 4,596.06 9,176.60 44.17 100.75 6,975.16 6,904.26 -654.70 5,152.17 5,958,880.261 669,672.907 0.39 4,617.53 9,212.39 44.00 100.86 7,000.87 6,929.97 -659.37 5,176.63 5,958,876.130 669,697.460 0.52 4,638.92 9,248.30 43.92 100.93 7,026.72 6,955.82 -664.08 5,201.11 5,958,871.955 669,722.033 0.26 4,660.31 9,288.50 43.77 1.00.95 7,055.71 61984.81 -669.37 5,228.45 5,958,867.270 669,749.481 0.37 4,684.20 9,330.30 43.55 100.94 7,085.95 7,015.05 -674.85 5,256.78 5,958,862.413 669,777.925 0.53 4,708.95 9,371.99 43.47 100.98 7,116.19 7,045.29 -680.30 5,284.96 5,956,857.574 669,806.215 0.20 4,733.5 9,413.30 43.32 101.00 7,146.20 7,075.30 -685.71 5,312.82 5,958,852.775 669,834.186 0.36 4,757.89 9,454.10 43.02 101.14 7,175.96 7,105.06 -691.07 5,340.21 5,958,848.017 669,861.689 0.77 4,781.80 9,494.89 42.82 101.38 7,205.83 7,134.93 -696.50 5,367.46 5,958,843.191 669,889.042 0.63 4,805.54 9,535.70 42.67 101.50 7,235.80 7,164.90 -701.99 5,394.60 5,958,838.293 669,916.302 0.42 4,829.18 9,576.60 42.40 101.56 7,265.94 7,195.04 -707.52 5,421.70 5,958,833.361 669,943.507 0.67 4,852.74 9,617.39 42.07 101.68 7,296.14 7,225.24 -713.04 5,448.55 5,958,828.428 669,970.476 0.83 4,876.09 9,658.30 41.63 101.91 7,326.61 7,255.71 -718.62 5,475.27 5,958,823.436 669,997.308 1.14 4,899.29 9,699.10 41.08 102.23 7,357.24 7,286.34 -724.26 5,501.63 5,958,818.378 670,023.784 1.44 4,922.13 9,740.20 40.47 102.53 7,388.36 7,317.46 -730.01 5,527.85 5,958,813.199 670,050.120 1.56 4,944.80 9,781.09 39.92 102.76 7,419.60 7,348.70 -735.79 5,553.60 5,958,807.988 670,075.988 1.39 4,967.02 9,822.09 39.37 103.01 7,451.17 7,380.27 -741.62 5,579.10 5,958,802.715 670,101.608 1.40 4,988.99 12114/2016 10:45.27AM Page 15 COMPASS 5000,1 Build BIB BP F/FA2 Obp Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C -31C Design: C -31C Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well C-31 C-31A/B OKB @ 70.90usft C-31A/B OKB @ 70.90usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 9,863.10 38.67 103.30 7,483.03 7,412.13 -747.49 5,604.24 5,958,797.391 670,126.871 1.76 5,010.61 9,903.99 37.90 103.57 7,515.12 7,444.22 -753.38 5,628.88 5,958,792.047 670,151.633 1.93 5,031.7 9,944.80 37.08 103.82 7,547.50 7,476.60 -759.26 5,653.01 5,958,786.697 670,175.886 2.04 5,052.41 9,987.00 36.20 104.20 7,581.37 7,510.47 -765.36 5,677.45 5,958,781.137 670,200.447 2.15 5,073.29 10,006.00 35.82 104.20 7,596.73 7,525.83 -768.10 5,688.28 5,958,778.635 670,211.333 2.00 5,082.53 95/81, 10,011.00 35.72 104.20 7,600.79 7,529.89 -768.81 5,691.11 5,958,777.980 670,214.181 2.00 5,084.95 10,136.26 30.10 110.30 7,705.94 7,635.04 -788.70 5,756.09 5,958,759.520 670,279.573 5.20 5,139.20 10,229.57 25.99 128.17 7,788.42 7,717.52 -809.50 5,794.19 5,958,739.562 670,318.118 9.98 5,167.89 10,325.39 26.86 148.29 7,874.40 7,803.50 -840.95 5,822.13 5,958,708.730 670,346.738 9.35 5,183.39 10,421.37 28.45 166.49 7,959.57 7,888.67 -881.70 5,838.90 5,958,668.358 670,364.394 8.92 5,185.21 10,513.23 29,80 168.90 8,039.81 7,968.91 -925.38 5,648.41 5,958,624.902 670,374.854 1.95 5,179.21 10,604.14 32.24 163.85 8,117.73 8,046.83 -970.86 5,859.50 5,958,579.685 670,386.943 3.92 5,174.08 10,698.34 30.65 160.14 8,198.10 8,127.20 -1,017.58 5,874.65 5,958,533.306 670,403.110 2.66 5,172.33 10,788.09 29.10 160.11 8,275.92 8,205.02 -1,059.62 5,889.85 5,958,491,610 670,419.223 1.73 5,172.24 10,882.52 28.51 160.34 8,358.67 8,287.77 -1,102.44 5,905.25 5,958,449.145 670,435.550 0.64 5,172.06 10,945.88 28.62 157.49 8,414.32 8,343.42 -1,130.70 5,916.14 5,958,421.132 670,447.062 2.16 5,172.6 11,039.39 28.21 157.42 8,496.56 8,425.66 -1,171.79 5,933.20 5,958,380.422 670,465.017 0.44 5,174.61 11,133.32 28.79 157.09 8,579.11 8,508.21 -1,213.13 5,950.53 5,958,339.480 670,483.246 0.64 5,176.76 11,225.99 29.36 156.54 8,660.10 8,589.20 -1,254.52 5,968.26 5,958,298.486 670,501.877 0.68 5,179.26 11,319.38 29.63 154.60 8,741.39 8,670.49 -1,296.38 5,987.28 5,958,257.058 670,521.805 1.06 5,182.82 TIP 11,325.00 29.92 155.19 8,746.27 8,675.37 -1,298.91 5,988.46 5,958,254.558 670,523.044 7.27 5,183.06 KOP 11,350.64 39.41 161.00 8,767.34 8,696.44 -1,312.44 5,993.81 5,958,241.145 670,528.685 39.17 5,183.46 Interpolated Azimuth 11,380.16 44.01 170.00 8,769.39 8,718.49 -1,331.43 5,998.65 5,958,222.270 670,533.937 25.55 5,181.51 Interpolated Azimuth 12114/2016 10:45:27AM Page 16 COMPASS 5000.1 Build 81B by Final BP FAkv Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C-31 C Design: C-31 C Local Co-ordinate Reference: Well C-31 TVD Reference: C-31A/B OKB @ 70.90usft MD Reference: C-31A/B OKB @ 70.90usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 11,410.08 44.57 181.50 8,810.84 8,739.94 -1,352.19 6,000.18 5,958,201.545 670,535.924 26.88 5,175.8 Interpolated Azimuth 11,440.19 43.16 193.50 8,832.59 8,761.69 -1,372.81 5,997.50 5,958,180.880 670,533.690 27.98 5,166.28 Interpolated Azimuth 11,470.05 43.56 204.88 8,854.33 8,783.43 -1,392.10 5,990.77 5,958,161.445 670,527.392 26.18 5,153.36 11,500.17 43.26 214.71 8,876.24 8,805.34 -1,410.02 5,980.52 5,958,143.306 670,517.532 22.44 5,137.59 11,530.09 43.90 225.87 8,897.94 8,827.04 -1,425.69 5,967.22 5,958,127.346 670,504.576 25.78 5,119.73 11,560.15 44.13 236.58 8,919.59 8,848.69 -1,438.73 5,950.98 5,958,113.955 670,488.626 24.75 5,100.01 11,590.05 47.84 244.68 8,940.38 8,869.48 -1,449.22 5,932.25 5,958,103.063 670,470.135 23.08 5,078.83 11,620.26 52.65 253.16 8,959.72 8,888.82 -1,457.50 5,910.60 5,958,094.311 670,448.673 26.80 5,055.65 11,650.44 57.93 260.57 8,976.91 8,906.01 -1,463.08 5,886.46 5,958,088.205 670,424.667 26.69 5,031.06 11,680.27 63.44 268.47 8,991.53 8,920.63 -1,465.51 5,860.61 5,958,085.208 670,398.873 29.55 5,005.94 11,710.26 68.68 274.51 9,003.70 8,932.80 -1,464.77 5,833.23 5,958,085.350 670,371.491 25.37 4,980.47 11,740.26 74.88 267.94 9,013.09 8,942.19 -1,464.19 5,804.78 5,958,085.307 670,343.030 29.31 4,953.92 11,770.26 81.47 262.49 9,019.24 8,948.34 -1,466.65 5,775.55 5,958,082,204 670,313.861 28.25 4,925.61 11,801.98 87.97 256.47 9,022.16 8,951.26 -1,472.42 5,744.52 5,958,075.757 670,282.975 27.87 4,894.49 11,832.26 89.29 253.37 9,022.88 8,951.98 -1,480.30 5,715.30 5,958,067.245 670,253.932 11.12 4,864.3b 11,862.48 90.61 249.20 9,022.91 8,952.01 -1,489.99 5,686.68 5,958,056.928 670,225.538 14.47 4,834.13 11,892.59 92.24 253.08 9,022.16 8,951.26 -1,499.72 5,658.21 5,958,046.579 670,197.282 13.97 4,804.04 11,922.50 90.80 257.98 9,021.36 8,950.46 -1,507.19 5,629.26 5,958,038.480 670,168.512 17.07 4,774.29 11,952.26 90.40 262.04 9,021.05 8,950.15 -1,512.35 5,599.96 5,958,032.679 670,139.333 13.71 4,744.99 11,982.54 90.12 266.38 9,020.91 8,950.01 -1,515.40 5,569.85 5,958,028.967 670,109.292 14.36 4,715.64 12,010.16 90.74 272.12 9,020.71 8,949.81 -1,515.76 5,542.24 5,958,028.001 670,081.703 20.90 4,689.58 12,041.28 90.15 275.78 9,020.47 8,949.57 -1,513.62 5,511.20 5,958,029.465 670,050.626 11.91 4,661.15 12,070.34 90.92 279.14 9,020.19 8,949.29 -1,509.85 5,482.39 5,958,032.605 670,021.744 11.86 4,635.36 12,100.60 93.04 283.36 9,019.15 8,948.25 -1,503.95 5,452.74 5,958,037.852 669,991.971 15.60 4,609.52 12,130.20 91.14 287.51 9,018.07 8,947.17 -1,496.08 5,424.23 5,958,045.097 669,963.302 15.41 4,585.42 12/14/2016 10 45.27AM Page 17 COMPASS 5000.1 Build 81B Survey BP FS as Obp Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-31 TVDSS Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Easting Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft (') Well: C-31 North Reference: True (usft) Wellbore: C-31C Survey Calculation Method: Minimum Curvature (°I100usft) Design: C-31C Database: EDM RSK- Alaska PROD -ANCP1 284.18 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (') V) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 12,160.46 90.52 284.18 9,017.63 8,946.73 -1,487.82 5,395.13 5,958,052.717 669,934.027 11.19 4,560.90 12,190.32 89.97 280.59 9,017.50 8,946.60 -1,481.42 5,365.97 5,958,058.480 669,904.736 12.16 4,535.6 12,220.53 90.12 277.30 9,017.48 8,946.58 -1,476.72 5,336.13 5,958,062.522 669,874.804 10.90 4,509.26 12,250.41 90.03 273.97 9,017.44 8,946.54 -1,473.79 5,306.40 5,958,064.804 669,845.018 11.15 4,482.32 12,280.44 89.20 270.10 9,017.64 8,946.74 -1,472.72 5,276.40 5,958,065.213 669,814.999 13.18 4,454.49 12,309.97 87.45 265.72 9,018.50 8,947.60 -1,473.80 5,246.91 5,958,063.493 669,785.543 15.97 4,426.41 12,340.47 87.97 261.95 9,019.72 8,948.82 -1,477.07 5,216.61 5,958,059.558 669,755.330 12.47 4,396.83 12,370.42 88.46 258.28 9,020.66 8,949.76 -1,482.21 5,187.13 5,958,053.776 669,725.965 12.36 4,367.36 12,400.46 88.00 254.84 9,021.58 8,950.68 -1,489.19 5,157.93 5,958,046.162 669,696.928 11.55 4,337.54 12,430.32 88.74 251.10 9,022.43 8,951.53 -1,497.93 5,129.39 5,958,036.800 669,668.594 12.76 4,307.73 12,460.50 88.43 248.72 9,023.18 8,952.28 -1,508.29 5,101.06 5,958,025.820 669,640.497 7.95 4,277.57 12,490.18 87.11 243.70 9,024.34 8,953.44 -1,520.25 5,073.93 5,958,013.271 669,613.639 17.48 4,247.98 12,520.67 89.85 247.70 9,025.14 8,954.24 -1,532.79 5,046.16 5,958,000.129 669,586.151 15.90 4,217.60 12,549.86 89.85 253.23 9,025.22 8,954.32 -1,542.54 5,018.66 5,957,989.773 669,558.874 18.94 4,188.42 12,580.38 89.32 257.94 9,025.44 8,954.54 -1,550.14 4,989.11 5,957,981.533 669,529.499 15.53 4,158.05 12,608.10 89.11 261.99 9,025.82 8,954.92 -1,554.97 4,961.83 5,957,976.109 669,502.326 14.63 4,130.76 12,640.42 90.74 267.85 9,025.86 8,954.96 -1,557.83 4,929.65 5,957,972.545 669,470.220 18.82 4,099.5 12,666.70 88.96 266.78 9,025.93 8,955.03 -1,559.06 4,903.40 5,957,970.740 669,444.006 7.90 4,074.46 12,696.07 88.77 263.77 9,026.51 8,955.61 -1,561.48 4,874.14 5,957,967.682 669,414.807 10.27 4,046.13 12,728.82 88.83 260.35 9,027.20 8,956.30 -1,566.00 4,841.71 5,957,962.451 669,382.492 10.44 4,014.12 12,755.90 88.68 257.23 9,027.79 8,956.89 -1,571.26 4,815.16 5,957,956.609 669,356.061 11.53 3,987.37 12,786.34 88.47 253.35 9,028.55 8,957.65 -1,578.99 4,785.73 5,957,948.242 669,326.812 12.76 3,957.07 12,812.06 88.19 248.47 9,029.30 8,958.40 -1,587.39 4,761.44 5,957,939.307 669,302.715 19.00 3,931.37 12,840.36 87.42 244.94 9,030.38 8,959.48 -1,598.57 4,735.47 5,957,927.561 669,276.998 12.76 3,903.15 12,870.38 88.13 240.98 9,031.55 8,960.65 -1,612.21 4,708.76 5,957,913.346 669,250.592 13.39 3,873.38 12,900.00 89.11 238.15 9,032.26 8,961.36 -1,627.21 4,683.23 5,957,897.794 669,225.400 10.11 3,844.26 12,930.74 89.91 233.50 9,032.52 8,961.62 -1,644.47 4,657.81 5,957,879.981 669,200.362 15.35 3,814.47 12/14/2016 10:45:27AM Page 18 COMPASS 5000.1 Build 81B �� BP reAks Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PS C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C -31C Survey Calculation Method: Minimum Curvature Deslgn: C-31 C Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) l°) (°) (usft) (usft) (usft) (usft) (usft) (usft) ('/100usft) (usft) 12,960.42 88.56 229.32 9,032.92 8,962.02 -1,662.98 4,634.62 5,957,860.972 669,177.583 14.80 3,786,3 12,990.38 89.85 225.35 9,033.34 8,962.44 -1,683.27 4,612.60 5,957,840.199 669,156.011 13.93 3,758.71 13,020.32 89.05 221.77 9,033.62 8,962.72 -1,704.96 4,591.97 5,957,818.063 669,135.864 12.25 3,731.91 13,050.58 86.77 216.26 9,034.73 8,963.83 -1,728.45 4,572.94 5,957,794.169 669,117.355 .19.69 3,705.99 13,080.60 89.57 213.30 9,035.69 8,964.79 -1,753.09 4,555.83 5,957,769.162 669,100.789 13.57 3,681.49 13,105.40 90.58 211.20 9,035.65 8,964.75 -1,774.06 4,542.59 5,957,747.907 669,088.019 9.40 3,661.88 13,130.38 92.70 209.18 9,034.94 8,964.04 -1,795.64 4,530.04 5,957,726.058 669,075.940 11.72 3,642.70 13,160.42 93.04 213.31 9,033.43 8,962.53 -1,821.29 4,514.48 5,957,700.080 669,060.947 13.78 3,619.31 13,190.40 93.56 216.15 9,031.71 8,960.81 -1,845.88 4,497.43 5,957,675.119 669,044.441 9.61 3,594.87 13,220.32 92.45 219.79 9,030.14 8,959.24 -1,869.43 4,479.05 5,957,651.174 669,026.582 12.70 3,569.55 13,251.17 90.55 224.51 9,029.33 8,958.43 -1,892.29 4,458.36 5,957,627.873 669,006.400 16.49 3,542.29 13,280.40 88.46 221.37 9,029.58 8,958.68 -1,913.68 4,438.45 5,957,606.050 668,986.966 12.90 3,516.26 13,310.40 89.26 218.37 9,030.18 8;959.28 -1,936.70 4,419.23 5,957,582.618 668;968.251 10.35 3,490.33 13,340.19 89.48 214.99 9,030.51 8,959.61 -1,960.59 4,401.44 5,957,558.350 668,950.988 11.37 3,465.44 13,370.22 88.89 209.86 9,030.94 8;960.04 -1,985.92 4,385.34 5,957,532.669 668,935.452 17.19 3,441.65 13,410.22 90.95 203.33 9,030.99 8,960.09 -2,021.67 4,367.45 5,957,496.542 668,918.343 17.12 3,412.6 13,440.50 91.51 197.60 9,030.34 8,959.44 -2,050.02 4,356.87 5,957,467.969 668,908.387 19.01 3,392.971 13,470.63 90.43 193.20 9,029.83 8,958.93 -2,079.06 4,348.87 5,957,438.766 668,901.027 15.03 3,375.52 13,500.10 89.08 188.03 9,029.96 8,959.06 -2,108.01 4,343.44 5,957,409.701 668,896.236 18.13 3,360.52 13,530.59 91.54 189.32 9,029.79 8,958.89 -2,138.15 4,338.84 5,957,379.472 668,892.299 9.11 3,345.89 13,560.44 92.71 192.12 9,028.69 8,957.79 -2,167.45 4,333.30 5,957,350.054 668,887.394 10.16 3,330.65 13,579.66 92.15 193.43 9,027.87 8,956.97 -2,186.18 4,329.05 5,957,331.240 668,883.559 7.41 3,320.26 13,601.21 92.15 193.43 9,027.06 8,956.16 -2,207.13 4,324.05 5,957,310.191 668,879.018 0.00 3,308.39 PRODUCTION LINER 1 13,612.00 92.15 193.43 9,026.66 8,955.76 -2,217.61 4,321.54 5,957,299.652 668,876.744 0.00 3,302.45 Projection to TD - 23/8" 1211412016 10:45.27AM Page 19 COMPASS 5000.1 Build 81B BP WE FA a p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: C-31A/B OKB @ 70.90usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C -31C Survey Calculation Method: Minimum Curvature Design: C -31C Database: EDM RSK- Alaska PROD -ANCP1 11,350.64 8,767.34 -1,312.44 5,993.81 Interpolated Azimuth 13,612.00 9,026.66 2-3/8" 2.375 3.250 -1,331.43 5,998.65 13,601.21 9,027.06 PRODUCTION LINER 1 2.375 2.375 8,810.84 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 11,319.38 8,741.39 -1,296.38 5,987.28 TIP 11,325.00 8,746.27 -1,298.91 5,988.46 KOP 11,350.64 8,767.34 -1,312.44 5,993.81 Interpolated Azimuth 11,380.16 8,789.39 -1,331.43 5,998.65 Interpolated Azimuth 11,410.08 8,810.84 -1,352.19 6,000.18 Interpolated Azimuth 11,440.19 8,832.59 -1,372.81 5,997.50 Interpolated Azimuth 13,612.00 9,026.66 -2,217.61 4,321.54 Projection to TD Approved By: Yosha Ragbirsingh Survey Manager Baker Hughes 12/14/2016 10.45:27AM Page 20 COMPASS 5000.1 Build 818 THE STATE GOVERNOR BILL WALKER John Egbej imba Drilling Supervisor BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU C-31 C BP Exploration (Alaska), Inc. Permit to Drill Number: 216-134 Conservation Commissi®n 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Surface Location: 1800' FNL, 883' FEL, SEC. 19, TI IN, RI 4E, UM Bottomhole Location: 4012' FNL, 3388' FWL, SEC. 20, TI IN, R14E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Z6V'- Daniel T. Seamount, Jr. Commissioner DATED this 6 7 day of November, 2016. RECEIVED STATE OF ALASKA SKA OIL AND GAS CONSERVATION COMMIS: NOV ® 2 2016 PERMIT TO DRILL 20 AAC 25.005 1 a. Type of Work: 1b, Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well is proposed for: Drill ❑ Lateral ❑ Stratigraphic Test ❑ Development - Oil Q • Service - Winj ❑ Single Zone H Coalbed Gas ❑ Gas Hydrates ❑ Redrill H • Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket a -Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 29S105380 • PBU C -31C 3 Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 13755' . TVD: 8956'ss - PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): ADL 028305 , Surface: 1800' FNL, 883' FEL, Sec. 19, T11N, R14E, UM 8. Land Use Permit: 13. Approximate spud date: Top of Productive Horizon: 3333' FNL, 5204' FWL, Sec. 20, T11N, R14E, UM 80-274 December 1, 2016 9. Acres in Property: 2480 14. Distance to Nearest Property: Total Depth: 4012' FNL, 3388' FWL, Sec. 20, T11N, R14E, UM 29820 ' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: . 70.97feet15.Distance to Nearest Well Open to Same Pool: Surface: x- y- 5959422 Zone - ASP 4 GL Elevation above MSL: • 37.28 950 16. Deviated wells: i( /4-/(- Kickoff Depth: 11328 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3410 • Surface: 2530 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weiqht Grade Cougling Length MD TVD TVD (includingstage data 3-1/4" 2-3/8" 4.7# L-80 H511 2467' 11308' 8661'ss 13755' 8956'ss 85 sx Class 'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): 1 Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 1 13688 9022 12610,13400 12610 9026 None Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20" 8 cu vds Concrete 37-117 37-117 Surface 2792 13-3/8" 3900 cu ft Permafrost 36-2828 36-2722 Intermediate 9973 9-5/8" 2335 cu It Class 'G' 33 - 10006 33-7597 Liner 2082 7" 416 cu ft Class 'G' 9860-11942 7481 -9014 Liner See Attachment Perforation Depth MD (ft): 12050 - 13670 Perforation Depth TVD (ft): 9014-9022 20. Attachments Property Plat ❑ BOP Sketch 121 Drilling Program R1 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 requirements Q 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Browninq, Zachary H from without prior written approval. Email Zachary.Browninq@bp.com Printed Name John Egbejimba Title Drilling Supervisor Signature Phone +1 907 564 4139 Date I t Commission Use Only Permit to Drill Number: I _,%4 API Number: 50- 029-21775-03-00 Permit Approval Date: Seecover letter for other -k4 1, req Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Q� Other: Samples req'd: Yes ❑ No I/ Mud log req'd: Yes ❑/ No L� � � � -M ��� FSS. j 1-12S measures Yes De No 0Directional svy req'd: Yes Q No ❑ / Spacing exception req'd: Yes El No M Inclination -only svy req'd: Yes 11No 15/ Post initial injection MIT req'd: Yes ❑ No ❑ APPROVED BY Approved bylk.COMMISSIONER THE COMMISSION Date: l % 7 / ORIGINAL Form 10-401 Revised 11/2015 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) Submit Form and M- j,��5 Attachments in Duplicate Casing / Tubing Attachment C-31 C Casing Length Size MD TVD Hole Size Cementing Record CONDUCTOR 80 20" x 30" 37 117 37 117 8 cu ycls Concrete SURFACE 2792 13-3/8" 68# L-80 36 2828 36 2722 3900 cu ft Permafrost INTERMEDIATE 9973 9-5/8" 47# L-80 33 10006 33 7597 2335 cu ft Class 'G' LINER 2082 7" 29# L-80 9860 11942 7480 9014 416 cu ft Class 'G' LINER 2322 2-3/8" 4.6# L-80 11366 13688 8781 9022 309 cu ft Class 'G' LINER 145 4-1/2" 12.6# L-80 11902 - 12047 9014 9014 95 cu ft Class'G' TUBING 11426 3-1/2" 9.3# L-80 31 11458 31 8853 To: Alaska Oil & Gas Conservation Commission From: Zach Browning ObpCTD Engineer Date: November 2, 2016 Re: C-31 C Permit to Drill Request (Revised Permit to Drill) Approval is requested for a permit to drill a CTD sidetrack lateral from well C-31 B with a Nordic Coiled Tubing Drilling rig on or around December 1St, 2016. Planned operations: Drill a through tubing sidetrack with the Nordic 2 Coiled Tubing Drilling rig on or around December 1st 2016. A plug will be set pre -rig above the C-31 B production liner isolating the open perforations. Cement will be squeezed into the IA below the production packer to allow for a dual string exit. The cement will be placed between 11,359' MD and 11,280' MD (shown on the proposed schematic attached). Then a 3-1/2" monobore whipstock will be set pre -rig to allow for a 2.80" 3.5" x 7" dual string exit. The well kicks -off in lower Zone 4, and will land and target reserves in Zone 1A/1 B above the HOT. The proposed sidetrack is a 2500' horizontal Ivishak producer to be completed with a 2-3/8" L-80 solid liner, cemented in place and selectively perforated. The open parent perf intervals are below the KOP and will be isolated via the plug set pre -rig as well as the liner cement job or liner top packer.* Rig Work scheduled to begin December 1St, 2016 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,530 psi). 2. Mill 2.80" window. 3. Drill build: 3.25" OH, 473' 24 deg DLS planned). 4. Drill Lateral: 3.25" OH, 1954' 12 deg DLSplanned) 5. Run 2-3/8" L-80 liner leaving TOL at 11,308' MD. 6. Pump primarycement job: 17.5bbls, 15.3 ppg Class G, TOC at TOL 11,308' MD).* 7. Test liner lap to 2400 psi. 1/ 8. Selectively perforate. 9. Freeze protect well to a min 2,200' TVDss. 10. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) Post -Rig Work: 1. O: Re -install wellhouse, and flowline if needed. 2. V: Tree work as necessary. 3. S: LTP set post rig if needed, and test.* 4. S: Install LGLVs 5. C: RPM log. 6. O: NWKO IV.N omL ( Mud Program: • Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (434psi over -balance). Disposal: • All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1 % hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 3.25" for production hole section from 11,328' MD to 13,775' MD. Liner Program: • 2-3/8", 4.7 Ib/ft, H511, L-80 solid liner: 11,308' MD — 13,775' MD ' • A planned 17.5 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at 11,308' MD). ✓ • The primary barrier for this operation: a minimum EMW of 8.4 ppg (434 psi over -balance). • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 900 (TD), inclination at kick off point is 30°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property — 29,820' (North) • Distance to nearest well within pool — 950' (C -32D) Logging: • MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. • Cased hole GR/CCL/RPM logs will be run inside casing (post -rig). Perforating: • Perforations: —300' of perforations, 1.56", 60 deg random phasing, 6 spf, pert guns. - Anti -Collision Failures: • None. All offset wells pass BP anti -collision scan criteria. Hazards: j • C -pad is not an H2S pad. Latest H2S reading on the C-31 was 23ppm on 2/4/15. • No planned fault crossings. The lost circulation risk in C -31C is considered to be LOW. Reservoir Pressure: • The reservoir pressure on C -31C is expected to be 3,410 psi at 8,800' TVDSS (7.45 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,530 psi. • A min EMW of 8.4 ppg for this well will provide 434 psi over -balance to the reservoir. Zach Browning CC: Well File CTD Engineer Joseph Lastufka 564-5220 IELLHEAD = CTUATOR= IuE EVOY BAKEIRC C-31 B id ELEV = 67.8' DATE SOZ - 3-73" 6 OP = 1700' 01/11/15 lax Angle= 96" @ 12186' 6 stun MU = 11487' SS ^ stun TVD = 8800 SS 6 13-3/8" CSG, 68#, L-80 BUTT, ID = 12.415" 2826' Minimum ID =1.995" c@ 11372' TOP OF 2-3/8" LINER 5/8" X 7" BKR LTP w / TEBACK SLV , D = 6.187" I-- 9860' 9-5/8" X 7" BKR NSCC LNR HGR, ID = 6.250" 1—i 9873' 9-5/8" CSG, 47#, L-80 NSCC/BLFrT, D = 8.681" J ---j 10006' 3-1 /2" TBG, 9.3#, L-80 NSCT, .0087 bpf, D = 2.992" (—j 11467' 7" LNR 29#, L-80 NSCT, .0371 bpf, D = 6.184" !— WHIPSTOCK W/ 2 RA TAGS -1/2" LNR, 12.6#, NT -80 NSCT, .0152 bpf, D = 3.958" 11942' 12025' –12026' PEJORATION SUMMWRY REF LOG: MWD / GR ON 04/15/03 A NGLE AT TOP PERF: 90'C&12050' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sgz DATE SOZ 1.56" 6 12050 - 12080 O 01/11/15 50 1.56" 6 12080 -12110 O 01/10/15 2 1.56" 6 12110 - 12140 O 01/10115 RK 1.56" 6 12140 - 12170 O 01/10/15 29 1-56" 6 12170 - 12200 O 01/09/15 1.56" 6 12200 - 12230 O 01/09/15 1-1/2" 4 12700 - 12760 C 04/23/03 1-1/2" 4 12930 - 13355 C 04/23/03 1-1/2" 4 13480 - 13670 C 04/23/03 SAFET" VOTES: WELL ANGLE > 70° @ 11730'. 2116' 1-i 3-112" OTIS SSSV LAND. NP, D = 2.75" ST MO TVD DEV TYPE VLV LATCH PORT DATE 3 5091 4271 50 1 MMG I DW RK 008/20/16 2 8601 16568 46 MMS OM1' RK 0 08/20/16 1 11232 8665 29 1 MW --P-2 DMY RK 0 04/30/03 9-518" SIDETRACK WINDOW - 10006'- 10056' (SECTION MLL) NOTE PRE SDTRK WELLBORE NOT SHOWN BELOW 9-518" MLLOUT V*MW. 11260" -13-112" OTIS X NE', D = 2.75" 11274' T x 3-112" BKR SABL-3 PKR, ID 11299'3-112" OTISX NP, D 22.75" 11366' 2.70" BKR DEPLOY MEdT SLV , D = 2.250" 11446' 3-1/2" OTtS X NP, D = 2.75" 11467' — 3-1/2" WLEG, D = 2.992" 11466' SMD TT LOGG®10/09198 11660' TOP OF Cl3NEV'f 11884' 1' X 4-1/2" BKR H LNR TOP PKR. I[= 4.44" 11902' 7" X 4-1/2' LTP w /BKR TEBAa< SLV, D = 5-25" 11916' 7" X 4-1/2" BKR LNR HGP, D = 4.37" M/LLOUT WINDOW 1ZAT - 12051' 12610' 1—j2-3/8" WFDaBP(10/12/15) 13400' 1--j2-3/8" CBP(01/08/14) 13674' H PBTD 2-318" LNR, 4.6#, L-80 STL, .0039 bpf. D = 1.995"13688' PRUDHOE BAY UNIT WELL C -31B PERMT No: '2030080 AR No: 50-029-21775-02 SEC 19, T11 N, R1 4E, 1800' FN[- & 883' FEL DATE REV BY OOMMBNfTS DATE REV BY 0OMVE3JTS 02/22/88 N18E ORIGINAL COMPLETION 11/09/15 ATO/JSET CBP(10/12/15) 03111195 DQ14 RIG SIDETRACK (C -31A) 08124/16 JAPJJLU GLV C/O (08/20/16) 04/24/03 DAV/KK CTD SIDETRACK (C -31B) 03/20/14 RB/JMD TREE CIO (03118/14) 02/10/15 MSS/J ADPERFS (01/09-11115) BP ExDioration (Alaska) 102/10/151 JMD 1WBS CLEANED UP PER TALLES ELLHEAD=_ McEVOY CTUATOR = � 67.8' F. ELEV = 37.3' DP= 1700' ax Angle = @ Aum MD = atumTVD= 88W SS 13-3/8" CSG, 68#, L-80 BUTT, ID = 12.415" 2825' Minimum ID =1.995" @ 11372' TOP OF 2-3/8" LINER 5/8" X 7" BKR LTP w / T8 BACK SLV , ® = 6.187" 9860' 9-5/8" X 7" BKR NSCC LNR HGR, ID = 6.250" 9873' 9-5/8" CSG, 47#, L-80 NSMBUTT, ff) = 8.681" 10006' — 3-1/2" OTS X NP, X2.75" 11260' Tubing Punch 11280' 13-1/2- WHPSTOCK 13-112' Cement Retainer 11351 °�— Tubing Punch 3 1/2" Tubing Plug 11359' 3-1 /2" TBG, 9.3#, L-80 NSCT, _0087 bpf, D = 2.992" 11457' 7" LNR, 29#, L-80 NSCT, .0371 bpf, ID = 6.184" 11942' WHIPSTOCK W/ 2 RA TAGS 12025' -1/2" LNR, 12.6#, NT -80 NSCT, .0152 bpf, ID = 3.958" —12025' PERFORATION SUMMARY REF LOG: ON / !_ ANGLE AT TOP PERF: _" @ Note: Refer to Production DB for historical perf data SIZE I SPF I INTERVAL I Opn/Sgz I DATE I SOZ C-31 G SAFET" NOTES: WELL ANGLE> 70° @ 101 2115' 1--13-1/2" OTIS SSSV LAND. NIP, D = 2.75" GAS LIFT MANDRELS ST MD ?VD DEV TYPE VLV LATCH PORT DATE 3 5091 4271 50 MMG DMY RK 0 08/20/16 2 8601 BULT PROPOSAL 46 MMG DMY RK 0 08/20/16 1 11232 16568 8665 29 MMG-2 DMY RK 0 04/30/03 11274' —L7" x 3-1/2" BKR SABL-3 PKR, ID = 3.85" 113fl8' 2.70" DEPLOY KENT SLEEVE, ID = MILLOUT WINDOW (C-31 C) 11328' - 11338' I JT w /RA TAG PBTD —_ 2-3/8" LNR, 4.7#, L-80 H511, .0039 bpf, ID = 1.995" 1 13755' 1 MI -LOUT WINDOW 1204T - 12051' PBTD 13674' X 2-3/8" LNR, 4.6#, L-80 STL, .0039 bpf, D = 1.995" 13688' DATE REV BY COMMENTS DATE REV BY COMMENTS 02/22/88 N18E ORIGINAL COMPLETION 03/11/95 D-14 RIG SIDETRACK (C -31A) 04/24/03 DAV/KK CTD SIDETRACK (C -31B) CTD SIDETRACK (C -31C) 09/08/161 JMD BULT PROPOSAL PRUCHOE BAY UNIT WELL C•31 PEF TT No: API No: 50-029-21775-0' SEC 19, T11 N, RUE, 1800' FNL & 883' FEL BP Exploration (Alaska) 1�14*1100 Zk4J b P North America - ALASKA - BP Prudhoe Bay PB C Pad C-31 C-31 C Plan: C -31C WP06 BP Coil Tubing Report 02 November, 2016 Few 2 BAKER HUGHES BP rias �, by BP Coil Tubing Report BAKER A100" HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C -31C Design: C -31C WP06 Local Co-ordinate Reference: Well C-31 TVD Reference: Mean Sea Level MD Reference: C-31A/B OKB @ 70.90usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 ' Using geodetic scale factor Site PB C Pad, TR -11-14 Site Position: 662,550.030 usft From: Map Position Uncertainty: 0.00 usft Well C-31, C-31 Well Position +N/ -S 0.00 usft +E/ -W 0.00 usft Position Uncertainty 0.00 usft Wellbore C-31 C Magnetics Model Name Sample Date BGGM2016 12/1/2016 Design C -31C WP06 Audit Notes: Version: Vertical Section: Northing: 5,957,218.720 usft Easting: 662,550.030 usft Slot Radius: 0.000 in Northing: 5,959,422.000 usft ° Easting: 664,508.000 usft . Wellhead Elevation: 38.98 usft Latitude: Longitude: Grid Convergence: Latitude: Longitude: Ground Level: Declination Dip Angle Field Strength (°) (°) (nT) 18.16 81.01 57,558 Phase: PROTOTYPE Depth From (TVD) +N/ -S (usft) (usft) -38.98 0.00 Tie On Depth: 11,225.99 +E/ -W Direction (usft) (I 0.00 70.00 70° 17'22.367 N 148° 41'2.797 W 1.24 ° 70° 17'43.614 N 148° 40'4.350 W 37.28 usft 11/212016 1:37:44AM Page 2 COMPASS 5000.1 Build 81B BP rel F&6 pBP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA - BP Well C-31 Project: Prudhoe Bay Mean Sea Level MD Reference: Site: PB C Pad North Reference: True Well: C-31 Minimum Curvature Database: Wellbore: C -31C MWD MWD - Standard Design: C -31C WP06 Survey Tool Program Date 11/2/2016 MWD - Standard From To (usft) (usft) Survey (Wellbore) 50.00 9,944.80 GCT (C-31PB1) TVDSS 9,987.00 11,225.99 2: MWD - Standard (C -31A) 11,225.99 13,755.50 C -31C WP06 (C-31 C) Planned Survey (usft) (usft) MD Inc Azi (usft) (usft) (°) (°) -1,254.52 11,225.99 29.36 156.54 Actual Survey C -31A 8,653.64 -1,287.72 11,300.00 29.57 155.00 11,319.38 29.63 154.60 Actual Survey C -31A TIP 5,958,257.057 670,521.804 11,328.00 30.00 155.36 KOP 5,958,253.214 670,523.701 11,348.00 31.80 155.36 End 9deg/100ft 5,958,243.975 670,528.186 11,398.00 43.80 155.36 5 5,958,216.459 670,541.544 11,400.00 43.65 156.02 11,500.00 41.80 191.61 11,600.00 50.31 223.08 11,693.00 63.94 244.28 6 8,880.79 -1,465.45 11,700.00 65.62 244.28 11,800.00 89.62 244.28 11,801.50 89.98 244.28 End 24deg/100ft 8,934.54 -1,513.04 11,900.00 89.98 256.10 12,000.00 89.98 268.10 Local Co-ordinate Reference: Well C-31 TVD Reference: Mean Sea Level MD Reference: C-31A/B OKB @ 70.90usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 V. Sec (usft) 5,179.26 5,181.95 5,182.81 5,183.19 5,184.02 5,186.49 5,186.60 5,171.30 5,118.76 5,044.35 TFace 0.00 -75.06 -73.72 45.93 0.00 0.00 108.00 107.52 80.99 58.80 5,038.05 Tool Name Description 0.00 4,940.08 0.00 4,841.75 GCT -MS Schlumberger GCT multishot 90.00 MWD MWD - Standard MWD MWD - Standard if TVDSS N/S E/W Northing Easting DLeg (usft) (usft) (usft) (usft) (usft) (°/100usft) 8,589.20 -1,254.52 5,968.26 5,958,298.485 if 670,501.877 0.00 8,653.64 -1,287.72 5,983.20 5,958,265.626 670,517.540 1.06 8,670.49 -1,296.38 5,987.28 5,958,257.057 670,521.804 1.06 8,677.97 -1,300.27 5,989.09 5,958,253.214 670,523.701 6.14 8,695.13 -1,309.60 5,993.37 5,958,243.975 670,528.186 9.00 8,734.56 -1,337.41 6,006.13 5,958,216.459 670,541.544 24.00 8,736.01 -1,338.66 6,006.70 5,958,215.212 670,542.140 24.00 8,810.55 -1,403.80 6,014.13 5,958,150.260 670,550.993 24.00 8,880.79 -1,465.45 5,980.65 5,958,087.893 670,518.877 24.00 8,931.55 -1,510.29 5,917.78 5,958,041.693 670,457.010 24.00 8,934.54 -1,513.04 5,912.08 5,958,038.821 670,451.367 24.00 8,955.82 -1,555.12 5,824.73 5,957,994.837 670,364.963 24.00 8,955.83 -1,555.77 5,823.37 5,957,994.157 670,363.626 24.00 8,955.87 -1,589.10 5,730.87 5,957,958.814 670,271.880 12.00 8,955.91 -1,602.83 5,632.00 5,957,942.928 670,173.342 12.00 V. Sec (usft) 5,179.26 5,181.95 5,182.81 5,183.19 5,184.02 5,186.49 5,186.60 5,171.30 5,118.76 5,044.35 TFace 0.00 -75.06 -73.72 45.93 0.00 0.00 108.00 107.52 80.99 58.80 5,038.05 0.00 4,941.57 0.00 4,940.08 0.00 4,841.75 90.00 4,744.15 90.00 11/2/2016 1:37:44AM Page 3 COMPASS 5000.1 Build 81B sBP bp reA.■ s, BP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 North Reference: True Wellbore: C -31C Survey Calculation Method: Minimum Curvature Design: C -31C WP06 Database: EDM R5K-Alaska PROD -ANCP1 Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) (°) 12,100.00 89.98 280.10 8,955.94 -1,595.70 5,532.44 5,957,947.877 670,073.654 12.00 4,653.03 89.99 12,101.50 89.98 280.28 8,955.94 -1,595.43 5,530.96 5,957,948.110 670,072.172 12.00 4,651.73 89.F 8 12,200.00 89.98 292.10 8,955.97 -1,568.03 5,436.53 5,957,973.444 669,977.174 12.00 4,572.38 90.00 12,251.50 89.98 298.28 8,955.99 -1,546.12 5,389.95 5,957,994.323 669,930.127 12.00 4,536.10 90.00 9 12,300.00 89.98 292.46 8,956.00 -1,525.35 5,346.15 5,958,014.126 669,885.881 12.00 4,502.03 -90.00 12,400.00 89.98 280.46 8,956.03 -1,497.07 5,250.42 5,958,040.299 669,789.563 12.00 4,421.75 -90.00 12,500.00 89.99 268.46 8,956.06 -1,489.32 5,150.90 5,958,045.874 669,689.909 12.00 4,330.89 -89.99 12,551.50 89.99 262.28 8,956.07 -1,493.48 5,099.60 5,958,040.594 669,638.709 12.00 4,281.25 -89.99 10 12,600.00 89.99 256.46 8,956.08 -1,502.42 5,051.95 5,958,030.608 669,591.273 12.00 4,233.42 -90.00 12,651.50 89.99 250.28 8,956.09 -1,517.16 5,002.63 5,958,014.798 669,542.289 12.00 4,182.04 -90.00 11 12,700.00 89.99 256.10 8,956.11 -1,531.18 4,956.22 5,957,999.763 669,496.204 12.00 4,133.63 90.00 12,800.00 89.99 268.10 8,956.13 -1,544.91 4,857.35 5,957,983.878 669,397.666 12.00 4,036.03 90.00 12,801.50 89.99 268.28 8,956.13 -1,544.96 4,855.85 5,957,983.797 669,396.168 12.00 4,034.60 90.0 12 12,900.00 89.99 256.46 8,956.15 -1,558.02 4,758.40 5,957,968.607 669,299.030 12.00 3,938.56 -90.00 13,000.00 89.99 244.46 8,956.17 -1,591.41 4,664.33 5,957,933.166 669,205.723 12.00 3,838.75 -90.00 13,100.00 89.99 232.46 8,956.19 -1,643.63 4,579.27 5,957,879.101 669,121.824 12.00 3,740.95 -89.99 13,101.50 89.99 232.28 8,956.19 -1,644.54 4,578.08 5,957,878.160 669,120.657 12.00 3,739.52 -89.99 13 13,200.00 89.99 220.46 8,956.21 -1,712.39 4,506.91 5,957,808.774 669,050.999 12.00 3,649.44 -90.00 13,300.00 89.99 208.46 8,956.23 -1,794.70 4,450.44 5,957,725.258 668,996.344 12.00 3,568.22 -90.00 13,400.00 89.99 196.46 8,956.24 -1,886.95 4,412.31 5,957,632.203 668,960.247 12.00 3,500.84 -90.00 13,401.50 89.99 196.28 8,956.24 -1,888.39 4,411.89 5,957,630.755 668,959.856 12.00 3,499.95 -89.99 14 11/2/2016 1.37:44AM Page 4 COMPASS 5000.1 Build 81B by Company: North America - ALASKA - BP Project: Prudhoe Bay Well C-31 Site: PB C Pad Well: C-31 Wellbore: C -31C TVD Reference: Design: C -31C WP06 Mean Sea Level Planned Survey MD Inc (usft) V) MD Reference: 13,471.50 89.99 15 13,500.00 89.99 13,600.00 89.99 13,700.00 89.99 13,755.50 89.99 TD at 13755.50 BP BP Coil Tubing Report rias BAKER HUGHES TFace -90.00 90.0" 90.00 90.00 90.00 11/2/2016 1:37.44AM Page 5 COMPASS 5000.1 Build 81B Local Co-ordinate Reference: Well C-31 TVD Reference: Mean Sea Level MD Reference: C-31A/B OKB @ 70.90usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Azi TVDSS N/S E/W Northing Easting DLeg V. Sec V) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 187.88 8,956.26 -1,956.78 4,397.26 5,957,562.067 668,946.726 12.00 3,462.81 191.30 8,956.26 -1,984.87 4,392.51 5,957,533.874 668,942.597 12.00 3,448.74 203.30 8,956.27 -2,080.18 4,362.84 5,957,437.950 668,915.015 12.00 3,388.26 215.30 8,956.29 -2,167.23 4,313.99 5,957,349.857 668,868.092 12.00 3,312.59 221.96 8,956.29 -2,210.56 4,279.37 ' 5,957,305.778 668,834.426 12.00 3,265.23 rias BAKER HUGHES TFace -90.00 90.0" 90.00 90.00 90.00 11/2/2016 1:37.44AM Page 5 COMPASS 5000.1 Build 81B 40, b BP " p BP Coil Tubing Report BAKER HUGHES Company: North America -ALASKA- BP Project: Prudhoe Bay Local Co-ordinate Reference: Well C-31 Site: PB C Pad TVD Reference: Mean Sea Level Well: C-31 MD Reference: C-31AIB OKB @ 70.90usft Wellbore: C -31C North Reference: True Survey Calculation Method: Minimum Curvature Design: C -31C WP06 Database: EDM R5K-Alaska PROD -ANCP1 Targets Target Name - h!Vmiss target Dip Angle Dip Dir. TVD +N/ -S +E/ -W Northing Easting -Shape (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude C -31C T.3 0.00 0.00 8,955.00 plan misses target center by 80.31usft at 13057.01usft MD (8956.19 TVD, -1619.00 -1,687.43 N, 4614.48 E) 4,656.51 5,957,837.000 669,200.000 70° 17' 27.004 N 148° 37'48.660 W Point C -31C Fault 1 0.00 0.00 -72.13 -1,465.70 plan misses target center by 8941.37usft at 11225.99usft MD (8589.20 TVD, 3,758.08 5,958,039.000 668,297.000 70° 17'29.190 N 148° 38' 14.837 W -1254.52 N, 5968.26 E) Polygon Point 1 -72.13 0.00 0.00 5,958,039.00 668,297.00 Point 2 -72.13 246.29 1,497.85 5,958,318.00 669,789.00 Point -72.13 553.22 2,190.78 5,958,640.00 670,475.00 Point 4 -72.13 246.29 1,497.85 5,958,318.00 669,789.00 C -31C Fault 2 0.00 0.00 -72.13 plan misses target center by 8871.36usft at 11225.99usft MD (8589.20 TVD, -1,467.34 4,061.14 5,958,044.000 668,600.000 70° 17'29.172 N 148° 38'6.005 W -1254.52 N, 5968.26 E) Polygon Point 1 -72.13 0.00 0.00 5,958,044.00 668,600.00 Point 2 -72.13 -443.42 -32.71 5,957,600.00 668,577.00 Point 3 -72.13 -1,140.13 -193.01 5,956,900.00 668,432.00 Point 4 72.13 443.42 32.71 5,957,600.00 668,577.00 C -31C Fault 3 0.00 0.00 -72.13 plan misses target center by 8945.45usft at 11225.99usft MD (8589.20 TVD, -1254.52 -2,447.98 N, 5968.26 E) 4,076.68 5,957,064.000 668,637.000 70° 17' 19.527 N 148° 38' 5.568 W Polygon Point 1 -72.13 0.00 0.00 5,957,064.00 668,637.00 Point 2 -72.13 -258.47 2,211.03 5,956,854.00 670,853.00 C -31C T.4 0.00 0.00 8,955.00 plan misses target center by 9.61 usft at 13755.49usft MD (8956.29 TVD, -2,216.51 N, 4,286.81 5,957,300.000 668,842.000 70° 17'21.803 N 148° 37'59.441 W -2210.56 Point 4279.37 E) C -31C Polygon 0.00 0.00 -72.13 plan misses target center by 8662.35usft at 11225.99usft MD (8589.20 TVD, -1,323.55 5,854.84 5,958,227.000 670,390.000 70° 17' 30.574 N 148° 37' 13.732 W -1254.52 N, 5968.26 E) Polygon Point 1 -72.13 0.00 0.00 5,958,227.00 670,390.00 Point -72.13 -219.12 -1,414.23 5,957,977.00 668,981.00 Point 3 -72.13 -911.95 -1,614.46 5,957,280.00 668,796.00 Point -72.13 -993.66 -1,263.14 5,957,206.00 669,149.00 Point 5 _ - _ -72.13 -497.58 -1,077.22 5,957,706.00 669,324.00 11/2/2016 1:37 44AM Page 6 COMPASS 5000.1 Build SIB ; FZA as 10000BP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA - BP Vertical Local Co-ordinate Reference: Well C-31 Project: Prudhoe Bay Depth +N/ -S +E/ -W (usft) TVD Reference: Mean Sea Level Site: PB C Pad Comment MD Reference: C-31A/B OKB @ 70.90usft Well: C-31 5,968.26 Actual Survey C -31A 11,319.38 8,670.49 -1,296.38 North Reference: True Wellbore: C -31C 8,677.97 Survey Calculation Method: Minimum Curvature Design: C -31C WPO6 11,348.00 Database: EDM R5K-Alaska PROD -ANCP1 Point 6 -72.13 -373.79 -517.34 5,957,842.00 669,881.00 Point 7 -72.13 -468.15 -45.26 5,957,758.00 670,355.00 Point 8 -72.13 -275.34 103.01 5,957,954.00 670,499.00 C -31C T.2 0.00 0.00 8,955.00 -1,540.24 plan misses target center by 49.74usft at 12449.10usft MD (8956.04 TVD, -1490.66 N, 5201.76 E) 5,197.90 5,957,996.000 669,738.000 70° 17'28.448 N 148° 37'32.881 W Point 12,101.50 8,955.94 -1,595.43 C -31C T.1 0.00 0.00 8,951.00 -1,548.00 plan misses target center by 24.58usft at 11838.88usft MD (8955.84 TVD, 5,780.91 5,958,001.000 670,321.000 70° 17'28.368 N 148° 37' 15.892 W -1570.67 N, 5789.10 E) Point 5,389.95 9 12,551.50 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 11,225.99 8,589.20 -1,254.52 5,968.26 Actual Survey C -31A 11,319.38 8,670.49 -1,296.38 5,987.28 Actual Survey C-31ATIP 11,328.00 8,677.97 -1,300.27 5,989.09 KOP 11,348.00 8,695.13 -1,309.60 5,993.37 End 9deg/100ft 11,398.00 8,734.56 -1,337.41 6,006.13 5 11,693.00 8,931.55 -1,510.29 5,917.78 6 11,801.50 8,955.83 -1,555.77 5,823.37 End 24deg/100ft 12,101.50 8,955.94 -1,595.43 5,530.96 8 12,251.50 8,955.99 -1,546.12 5,389.95 9 12,551.50 8,956.07 -1,493.48 5,099.60 10 12,651.50 8,956.09 -1,517.16 5,002.63 11 12,801.50 8,956.13 -1,544.96 4,855.85 12 13,101.50 8,956.19 -1,644.54 4,578.08 13 13,401.50 8,956.24 -1,888.39 4,411.89 14 13,471.50 8,956.26 -1,956.78 4,397.26 15 13,755.50 8,956.29 -2,210.56 4,279.37 TD at 13755.50 11/2/2016 1:37:44AM Page 7 COMPASS 5000.1 Build 81B Project: Prudhoe Bay Site: C Pad C - Well: C-31 Wellbore: C -31C Plan: C -31C WP06(C-31/C-31C) A:imrtFem 11 -NOM VVELLBORE DETAILS: C -31C MagMz N, :18.16 Megna6c Field C -31C � W57557.a. DlpArple:81.01 Dere: 12JlMl Parent Wellbore: C -31A M.&LOGGNIM Tie on MD: 11225.99 K&EKEM;E INFVKMA I Il1N Co-ordinate (NIE) Reference: Well C-31, True North Vertical (TVD) Reference: Mean Sea Level Section(VS)Refemnce: Slot -(0.00N, O.00E) Measured Depth Reference: C-31MB0KB@70.90usft Calculation Method. MiNmum Curvature WE ism BAKER HUGHES Or 1 j - WELL DETAILS: C-31 I +N/ -S +E/ -W Northing Ground Level* Eashng 37.28 Latitude Longitude Slot 1I 0.00 0.00 5959422.000 664508.000 70' 17'43.614N 148040'4.350 W -31C 3 _ I SECTIONDETAILS - rt ANNOTATIONS 4( Sec MD Inc Azi 9sND +{V/ -S +E/ -W Dleg TFace VSed Target TVD MD Annotation -61 1 11225.99 29.36 156.54 8589.20 -1254.52 5968.26 0.00 0.00 5179.26 8589.20 11225.99 Actual SurveyC-31A 2 11319.38 29.63 154.60 8670.49 -1296.38 5987.28 1.06 -75.06 5182.81 8670.49 11319.38 Actual Survey C -31A TIP gt 3 11328.00 30.00 155.36 8677.97 -1300.27 5989.09 6.14 45.93 5183.19 8677.97 11328.00 KOP 4 11348.00 31.80 155.36 8695.13 -1309.60 5993.37 9.00 0.00 5184.02 8695,13 11348.00 End9deg/100ft 5 11398.00 43.80 155.36 8734.56 -1337.41 6006.13 24.00 0.00 5186.49 8734.56 11398.00 5 -10C 6 11693.00 63.94 244.28 8931.55 .1510.29 5917.78 24.00 108.00 5044.35 8931.55 11693.00 6 7 11801.50 89.98 244.28 8955.83 -1555.77 5823.37 24.00 0.00 4940.08 8955.83 11801.50 End24deg/100ft 0-12C 8 12101.50 89.98 280.28 8955.94 -1595.43 5530.96 12.00 90.00 4651.73 8955.94 12101.50 8 0 9 12251.50 89.98 298.28 8955.99 -1546.12 5389.95 12.00 90.00 4536.10 8955.99 12251.50 9 V 10 12551.50 89.99 262.28 8956.07 -1493.48 5099.60 12.00 -90.00 4281.25 8956.07 12551.50 10 +-14C 11 12651.50 89.99 250.28 8956.09 -1517.16 5002.63 12.00 -90.00 4182.04 8956.09 12651.50 11 12 12801.50 89.99 268.28 8956.13 -1544.96 4855.65 12.00 90.00 4034.60 8956.13 12801.50 12 t -16C 13 13101.50 89.99 232.28 8956.19 -1644.54 4578.08 12.00 -90.00 3739.52 8956.19 13101.50 13 14 13401.50 89.99 196.28 8956.24 -1888.39 4411.89 12.00 -90.00 3499.95 8956.24 13401.50 14 77� 15 13471.50 89.99 187.88 8956.26 -1956.78 4397.26 12.00 -90.00 3462.81 8956.26 13471.50 15 r 180 16 13755.50 89.99 221.96 8956.29 -2210.56 4279.37 12.00 90.00 3265.23 8956.29 13755.50 TO at 13755.50 Z-200 _220 -240 -2601 -2801 -3001 K&EKEM;E INFVKMA I Il1N Co-ordinate (NIE) Reference: Well C-31, True North Vertical (TVD) Reference: Mean Sea Level Section(VS)Refemnce: Slot -(0.00N, O.00E) Measured Depth Reference: C-31MB0KB@70.90usft Calculation Method. MiNmum Curvature WE ism BAKER HUGHES Or 1 j - I I ' d1-31 C-31 C F9ult 1 _ C-31CT2 -31 C T.1 - -31C 3 _ I - rt C-31CFa' �� -+ - C-31CT - C -31/C-31 C - - - - - I4 C.31CFault3 r Li_.-_ _. .-----.. 1 II tC-31XC-31A II unn n +Finn ,-._ _ 4- -- -"-- ---- •_-- uuuu o_vu cwuu 6000 68UU 7000 7200 West( -)/East(+) (200 usft/in) 85801 >;1 I 1 8700 jI- 8640!-... -- '. - �-�i 1 _KOPIT-- ~ 8760 r Ft 1-3 � 8820 �- 1 �-- -+ �. r � �.- 1 _ � ��,J, � o. 8880 �I �-- __ 1 --�- --� C-31CT4 C 37/ 31B - it�-� C-31CT? C31CT T 8940 - _ �__ ��_ -'--- _ _ 9000 _. ecu 14 -- .� 12 1 I 10 - g - 8 13 ? 9060 IS --- nd_4d 100 F T 9180- 3060 3120 3180 3240 3300 3360 3420 3480 3540 3600 36603720 3780 3840 3900 3960 4020 4080 4140 4200 4260 4320 4380 4440 4500 4560 4620 468040 48100 4860 4920 4980 5040 51100 5160 527 __0 5280 5340 5400 Vertical Section at 70.00° (60 usft/in) -71 -31 -41 -51 _6( -7( -8( -9( -10( -I I( -l2( -13( O O -14( -15C 0 -16C -17C O -180 CA -190 200 710 220 -230 740 250 -260 -2701 Mean Sea Leve bp' Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C -31C Plan: C -31C WPO6(C-311C-31C) u� Magre4c va a�ar9d Dip, Di _ Mode WELLBORE DE FAILS: C-31 C KLIhLKtNUh mrunnw I;UN C-31 C Co-ordinate (HIE) Reference: Well C-31, True North I Vertical(TVD) Retemnce: Mean Sea Level Parent Wellbore: C -31A - T �- V p Section(VS)RefererMe: Sbt-(O.ODN,O.00E) TieonMD: 11225.99 Measured Depth Reference: C-31AIBOKB@70.90usfl Calculation Method: Minimum Curvature I VAd.o BAKER HUGHES 0 -- -i- C-4 IA h I I - T �- V p 1 61i 1 C-32 I II I 4 1 I _ •... __ _i i o C 32C _ - 961 -. 1 r �I C_1C I � �� i 7__ E, C�12A C 79 j ,Kr t2A PBL . J,.� . �,.,.- 33 3400 3500 IMCI 7700 Gann I— Anon A— noon Bonn aal� ann ons,.,. _; —+- ---,.�� tj __ _p}�00 --- --- -- ---- ----- ---- ---- --.... ­_ 11w 1— — Iovv J7vv 0wv oruu btoo bsUU b4UU USW 66U0 600 6800 6900 7000 West( -)/East(+) (100 usft/in) Project: Prudhoe Bay ANTI -COLLISION SETTINGS COMPANY DETAILS: North America -ALASKA - BP FFA it Site: PB C Pad // bp Well: C-31 Interpolation Method: MD, interval: 25.00 Calculation Method: Minimum Curvature ���/ Depth Range From: 11225.99 To 13756.00 Error System: ISCWSA BMER Wellbore: C -31C Results Limited By: Centre Distance. 1572.41 Scan Method: Tray. Cylinder North Huc,ws Plan: C -31C WPO6 (C -31/C -31C) Reference: Plan: C -31C WP06 (C -31/C -31C) Error Surface: Elliptical Conic Warning Method: Rules Based 400-- - - - - - - - - 380- 80360340 360- 340- C -32C Uncertainty Ellipse 320- 20300280260240O 300- 280- 260- 240- 0 N I C O 220 f0 CL Q) 200- 1) 18o C -31A U 0 2160- 160C) C) 140120Possible Offset Well 100 Magnetic Interference: 6D From To KOP - 11,540' MD 60 40 20 - W 'A O O O O O O c0 O N O W A 0 0 0 W t0 O � N W A 0 0 v C. O O 0 O O O O O O O O O O O O O O O O O 0 O O O O O O O O O O O O O O O O O O O O O O O O O O Measured Depth (100 usft/in) LEGEND - C-02, C-02, C-02 V1 a C-02, C -02A, C -02A VO - C-12, C -12C, C -12C VO +C-12, C-12CPBi, C-12CPB1 VO - C-31, C-31, C-31 V3 - C-31, C -31A, C -31A V1 - C -31,C-31 B, C -31B V2 �- C-31, C-31PB1, C-31PB1 VO -e- C-32, C-32, C-32 V1 - C-32, C -32A, C -32A V2 a C -32,C -32B, C -32B V3 C-32, C -32C, C -32C V2 -x- C-32, C-32DPB1, C-32DP81 VO a C-32, C -32D, C -32D VO s C-01, C -41A, C -41A V10 -� C-41, C-41APB1, C-41AP81 V5 b- 15-02, 15-02A, 15-02A V7 ero]ect: Prudhoe Bay ANTI -COLLISION SETTINGS COMPANY DETAILS: NorthAmerica- ALASKA - BP NAME Site: PB C Pad Calculation Method: Minimum Curvature NA bp Well: C-31 Interpolation Method: 1MD,12 interval: 25.00BMER Depth Range From: Centre D to 13756.2 Error System: ISCWSA N�S Wellbore: C -31C Results Limited By: Centre Distance: 1572.41 Scan Method: Tray. Cylinder North 0 Plan: C -31C WPO6 (C -31/C -31C) Reference: Plan: C -31C WP06 (C -31/C -31C) Error Surface: Elliptical Conic Warning Method: Rules Based Ground Level: 37.28 +WS +EI4NNorthing Easting Latittude Longitude Slot 0.00 0.00 5959422.000 664508.000 70° 17' 43.614 N 148° 40' 4.350 W Depth Range: 11225.99 To 13756.00 Sec MD Inc Azi TVD +N/ -S +E/ -W Dleg TFace VSect Possible Magnetic Interference: From Colour To MD 1 11225.99 29.36 156.54 8589.20 -1254.52 5968.26 0.00 0.00 5179.26 - From KOP to 11,450 MD OO -- 2 11319.38 29.63 154.60 8670.49 -1296.38 5987.28 1.06 -75.06 5182.81 34� ., 11226®11540 3 11328.00 30.00 155.36 8677.97 -1300.27 5989.09 6.14 45.93 5183.19 4 11348.00 31.80 155.36 8695.13 -1309.60 5993.37 9.00 0.00 5184.02 9U 1154011650 5 11398.00 43.80 155.36 8734.56 -1337.41 6006.13 24.00 0.00 5186.49 6 11693.00 63.94 244.28 8931.55 -1510.29 5917.78 24.00 108.00 5044.35 11650 13756 7 11801.50 89.98 244.28 8955.83 -1555.77 5823.37 24.00 0.00 4940.08 _ - ___ 8 12101.50 89.98 280.28 8955.94 -1595.43 5530.96 12.00 90.00 4651.73 32D - $� 0 9 12251.50 89.98 298.28 8955.99 -1546.12 5389.95 12.00 90.00 4536.10 10 12551.50 89.99 262.28 8956.07 -1493.48 5099.60 12.00 -90.00 4281.25 11 12651.50 89.99 250.28 8956.09 -1517.16 5002.63 12.00 -90.00 4182.04 _12 12801.50 89.99 268.28 8956.13 -1544.96 4855.85 12.00 90.00 4034.60 70 13 13101.50 89.99 232.28 8956.19 -1644.54 4578.08 12.00 -90.00 3739.52 14 13401.50 89.99 196.28 8956.24 -1888.39 4411.89 12.00 -90.00 3499.95 i 15 13471.50 69.99 187.88 8956.26 -1956.78 4397.26 12.00 -90.00 3462.81 60 16 13755.50 89.99 221.96 8956.29 -2210.56 4279.37 12.00 90.00 3265.23 C. -I r' UAIP06 - 300 60 50 A 40 i / \ Depth From Depth To Survey/Plan Tool 30 50.00 9944.80 GCT(C-31PB1) GCT -MS 9987.00 11225.99 2: MVVD -Standard (C -31A) MWD 11225.99 13755.50 C31C WP06 (C -31C) MWD 280 20 0 / 11 74 `,, 34 40 1 11517 0 1142 C 31:A,' 90 320 200 - 112 i 60 11550 260 � 20 � � 1 0 / 120 � 30 11,57 80C � P06 -31C 40 j //C- 1,4 4 11 5,17 114 5 , 50 1 7 C 240 120 -3,1A 11,57 60 1 E END e C-02, C-02, C-02 1 ' a C-02, C -02A, C-0 VO 6O 70 + C-12, C -12C, C -12C V0 ' -r~ C-12, C-12CPB1, C-1 PB4y0 Contact Info: - C-31, C-31, C-31 `O 1 ZO Jose Vazquez - Tech SupporhWe n S0 40 -C-31,C31A,C-31AV1 714478-4339 CetPhone -. C-31, C31B, C31B V2 907-341-7604 Emergency - C-31, C31PB1, C-31PB1 VO 160 YoshaRagbirsingh-SurveyManager 90 -o-C32,C32,C32V1 \ 907-342-2436 Cell Phone _ - C-32, C32A, C -32A V2 TaiStaurdivant- DDCoordinator 20�_ -C-3z,C32B,C32BV3 22 200 907-301-1858 Cell Phone too > C-32, C32C, C -32C V2 Patrick Rider -MWD Coordinator -_ a C-32, C -32D, C -32D VO 907-952-3497 CeRPhone 180 + C-32, C32DP81, C32DPB1 VO 20 240 60 Carl Ulrich - Operations Managero 907-382-5534 Cell Phone Azimuth from North [ ] vs Centre to Centre Separation [10 usft/in] 4 C41, C41A, C41A V 10 180 -C41,C41APB1,C41APB1V5 i.- 1,12 1549A 15 9A V] from North [°]vsCentre to Centre Separation [40usfVin] 0 jbp North America - ALASKA - BP Prudhoe Bay PB C Pad C-31 500292177500 C-31 C C-31 C WP06 Travelling Cylinder Report 02 November, 2016 BAKER HUGHES 1''; BP NAFAI ZsN0S b p Travelling Cylinder Report BAKER HUGHES Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00 usft Reference Well: C-31 Well Error: 0.00 usft Reference Wellbore C -31C Reference Design: C -31C WP06 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well C-31 Mean Sea Level C-31A/B OKB @ 70.90usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference C-31 C WP06 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25,00usft Error Model: ISCWSA Depth Range: 11,225.99 to 13,756.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,572.41 usft Error Surface: Elliptical Conic Survey Tool Program Date 11/2/2016 Centre to Casing From To Depth Distance Deviation Warning (usft) (usft) Survey (Wellbore) Tool Name Description 50.00 9,944.80 GCT (C-31 P61) GCT -MS Schlumberger GCT multishot 9,987.00 11,225.99 2: MWD - Standard (C-31 A) MWD MWD - Standard 11,225.99 13,755.50 C -31C WP06 (C-31 C) MWD MWD - Standard Casing Points 11,328.00 8,677.97 3.5" x 7" Planned TOWS Measured Vertical Centre to Casing Hole Depth Depth Distance Deviation Warning Diameter Diameter (usft) (usft) Name (in) (in) 2,828.12 2,651.30 13 3/8" 13.375 17.500 10,006.00 7,525.83 9 5/8" 9.625 12.250 11,328.00 8,677.97 3.5" x 7" Planned TOWS 3.500 3.500 13,755.50 8,956.29 2-3/8" 2.375 3.250 Summary Site Name Offset Well - Wellbore - Design PB C Pad C-01 - C-01 - C-01 C-01 - C-01 A- C-01 A C-01 - C-01 B- C-01 B C-01-C-01BPB1-C-01BPB1 C-02 - C-02 - C-02 C-02 - C -02A - C -02A C-05 - C-05 - C-05 C-05 - C -05A - C -05A C-06 - C-06 - C-06 C-06 - C -06A - C -06A C-06 - C-06APB1 - C-06APB1 C-06 - C -06B - C -06B C-07 - C-07 - C-07 C-07 - C -07A - C -07A C-08 - C-08 - C-08 C-08 - C -08A - C -08A C-08 - C-08APB1 - C-08APB1 C-08 - C -08B - C -08B C-08 - C-08BPB1 - C-08BPB1 C-08 - C -08C - C -08C C-08 - C-08CPB1 - C-08CPB1 C-08 - C-08CPB2 - C-08CPB2 C-10 - C-1 OA - C-1 OA C-12 - C-12 - C-12 Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Depth Depth Distance (usft) from Plan (usft) (usft) (usft) (usft) 13,401.50 9,675.00 1,475.74 13,401.50 9,675.00 1,475.74 Out of range Out of range Out of range Out of range 162.26 1,344.03 Pass - Major Risk 162.26 1,344.03 Pass - Major Risk Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 11/2/2016 1:48:05AM Page 2 COMPASS 5000.1 Build 81B wool h Bp Z7 by Travelling Cylinder Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB C Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: C-31 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore C -31C Database: Reference Design: C-31 C WP06 Offset TVD Reference: ri.a BAKER HUGHES Well C-31 Mean Sea Level C-31A/B OKB @ 70.90usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) PB C Pad C-12 - C -12A - C -12A Out of range C-12 - C-12APB1 - C-12APB1 Out of range C-12 - C -12B - C -12B Out of range C-12 - C -12C - C -12C 13,755.50 12,450.00 1,327.28 203.68 1,134.41 Pass - Major Risk C-12 - C-12CPB1 - C-12CPB1 12,008.96 13,400.00 1,493.31 273.00 1,220.40 Pass - Major Risk C-25 - C-25 - C-25 Out of range C-25 - C -25A - C -25A Out of range C-25 - C -25B - C -25B Out of range C-26 - C-26 - C-26 Out of range C-26 - C -26A - C -26A Out of range C-27 - C-27 - C-27 Out of range C-27 - C -27A - C -27A Out of range C-27 - C-27APB1 - C-27APB1 Out of range C-27 - C -27B - C -27B Out of range C-27 - C -27C - C -27C Out of range C-28 - C-28 - C-28 Out of range C-28 - C -28A - C -28A Out of range C-28 - C -28B - C -28B Out of range C-28 - C -28B - C -28B Wp6.0 Out of range C-29 - C-29 - C-29 Out of range C-29 - C -29A - C -29A Out of range C-29 - C -29B - C -29B Out of range C-29 - C -29B - Plan #7 C -29B approved Out of range C-30 - C-30 - C-30 Out of range C-30 - C -30A- C -30A Out of range C-31 - C-31 - C-31 11,244.66 11,325.00 440.30 33.05 407.50 Pass - Major Risk C-31 - C -31A- C -31A 11,534.43 11,550.00 39.43 0.33 39.43 Pass - NOERRORS C-31 - C-31 B - C-31 B 11,534.43 11,550.00 39.43 0.29 39.43 Pass - NOERRORS C-31 - C-31 PB1 - C-31PB1 11,247.39 11,325.00 433.64 46.97 386.86 Pass - Major Risk C-32 - C-32 - C-32 12,636.18 10,520.00 715.50 15.35 715.06 Pass - Minor 1/10 C-32 - C -32A- C -32A 11,263.95 11,350.01 602.67 4.31 598.55 Pass - Minor 1/10 C-32 - C -32B - C -32B 11,344.06 11,625.00 474.39 2.67 474.11 Pass - Minor 1/10 C-32 - C -32C - C -32C 12,981.58 10,625.00 628.93 7.89 628.66 Pass - Minor 1/10 C-32 - C -32D - C -32D 12,950.00 10,125.00 948.34 629.20 332.71 Pass - Major Risk C-32 - C-32DPB1 - C-32DPB1 12,950.00 10,125.00 948.34 629.24 332.67 Pass - Major Risk C-34 - C-34 - C-34 Out of range C-34 - C -34A - C -34A Out of range C-34 - C -34A - Plan #2 Out of range C-39 - C-39 - C-39 Out of range C-39 - C -39A - C -39A Out of range C-39 - C-39APB1 - C-39APB1 Out of range C-39 - C-39PB1 - C-39PB1 Out of range C-41 - C-41 - C-41 Out of range C -41 -C -41A -C -41A 12,537.17 12,600.00 1,184.99 411.80 773.18 Pass - Major Risk C-41 - C-41APB1 - C-41APB1 12,525.00 12,500.00 1,277.47 414.38 862.77 Pass - Major Risk C-41 - C-41 B- C-41 B Out of range PB DS 15 15-02 - 15-02A- 15-02A 11,500.00 11,700.00 1,084.97 224.13 911.62 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 11/2/2016 1:48:05AM Page 3 COMPASS 5000.1 Build 81B Project: Prudhoe Ba ftmw WTm Noe" WELLBORE DETAILS: C -31C NtrtNtM:t INWWA I IUN 1 Y MVNoah la.1s Site: PB C Pad M g� .FeId C -31C Ce -ordinate (NIE) Reference: Well C-31, True North Well: C-31 so.Mth:57W.O�n Vertical (TVD) Reference: Mean Sea Level Wellbore: C -31C — oiPW 1a:et.o1 Section (VS)Referenca: S6t-(O.00N, O.00E) o,m:lylrml Parent Wellbore: C -31A Plan: WPO6 Plus 600ft MD(C-311C 31C) Mood: BGG&MI Tie on MD: 11225.99 Measured Depth Reference' C-31N80K8@70.90usft Calculafion Method: Minimum Curvature Easting (90 usf fin) JI S Co $ 4n Sml Pn S pSm S pm8 Fn Sm S SI Pd S� S SI 8�pp S� Sp SI 81 SI Sp °1 o � p m p� �mmO O O O O O O O O O O O O O O O O O O O o O O O O O O O O O o O O 5958540 5958450 5958360 _ 8000 ce 5958270 m a C -32/C -32C 5958180 O 5958090 600 5959000 -31 1 _ V\I p us 500ft M 5957820 9p00 a 5957730 C -02/C-02 C -32/C -32D C -12/C-1213 59570 00 00 WP06 C-12/C-12CPB1 O° C -12/C-12 C -29/G29 Sa, 1/C -31C WP06 Plu 500ft MD, 1vC-12A 6 C -29/C -29A ,� ''C-12/C-12AP131 O + a 0 0 0 o 0 0 0 0 0 0 o o o o 0 Easting (90 usfVin) Mean Sea Level WIN R1 BAKER HUGHES J v b g � ® o 5958540 5958450 C -31/C-31 3 C -31/C -31A gas North America - ALASKA - BP Prudhoe Bay PB C Pad C-31 C-31 C C-31 C WP06 Plus 500ft MD AOGCC Offset Well Report 02 November, 2016 jr PPPII- Ad Fag BAKER HUGHES BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well C-31 Mean Sea Level C-31A/B OKB @ 70.90usft True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference C -31C WP06 Plus 500ft MD Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 11,225.99 to 14,255.50usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic rias BAKER HUGHES Survey Tool Program Date 11/2/2016 bp"0�405 From To Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00usft Reference Well: C-31 Well Error: 0.00usft Reference Wellbore C -31C Reference Design: C-31 C WP06 Plus 500ft MD BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well C-31 Mean Sea Level C-31A/B OKB @ 70.90usft True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference C -31C WP06 Plus 500ft MD Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 11,225.99 to 14,255.50usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic rias BAKER HUGHES Survey Tool Program Date 11/2/2016 From To Offset Centre to (usft) (usft) Survey (Wellbore) Tool Name Description 50.00 9,944.80 GCT (C-31 PB1) GCT -MS Schlumberger GCT multishot 9,987.00 11,225.99 2: MWD - Standard (C -31A) MWD MWD - Standard 11,225.99 14,255.50 C -31C WP06 Plus 500ft MD (C-31 C) MWD MWD - Standard Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) PB C Pad C-12 - C -12B - C -12B 14,254.91 12,325.00 151.73 C -31 -C -31A -C -31A 11,534.43 11,550.00 39.43 C-31 - C-31 B- C-31 B 11,534.43 11,550.00 39.43 C-31 - C -31C - C -31C WP06 13,750.00 13,750.00 0.00 PB DS 15 11/2/2016 2:21:43AM Page 2 of 9 COMPASS 5000.1 Build 81B NORDIC CTD UNIT # 2 CHOKE / REEL / CIRCULATION MANIFOLD DIAGRAM—� Cho ePjnel Standpipe 2"Circ lation Line Driller Gauge--- M. Mil MM B MM 9 Manual Choke � -caIista IAN/FOLD MM i8 MM 16 OfJ�" —Xa1 10152012 .B Transtlucer MM6 PVT Sensor MM7 I Baker Choke IN= 4 MM 12 MM 17 KILL SIDE MANUAL VALVE CHOKE SIDE MANUAL VALVE Rev Cir Line KILL HCR ✓Air B/ow tlown MM 12 MM76 � A� CHOKE HCR I 1 MM I Tubing Choke Line Be rChoke IG71 Lin I— — — — — — — — — — — — — — — — ~ I MP2 MP1 a I . y Kill Line I R \ BOP 18 HP n HP 10 Trana cer COILED TUBING I \ BOP n I l _ I 5 CIRCULATING SYSTEM WL HP 18 HP9 HP I �"- To Inner Reel I pow cm Valve MPS HP Mo HP3 II II HP2 HPI / I N2 � SLB / I CHOKE MANIFOLD A/ CM 85 MOS 129 GAS BUSTER CM 30 / CMJ / H auge P81Ah I CM 14 CMI/ CMB CM26 Note. 1 C CM6 CM6 C 1 PB2 id leg is 10' PB3 tiAb high ( CM7 I / CM15 CM2 I / CM21 CM4 CM17 CoxM I CM20 CM22 CM23 T/ge Tenk I / / CM76 CM79 CUTTINGS BOX I / TIGERTANK I / f — — — — — — — — — — — — — I TRANSMITTAL LETTER CHECKLIST WELL NAME: PTD: ' �C l /Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -) from records, data and logs acquired for well (name onpermit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where sample are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 PTD#: 2161340 Company BP EXPLORATION (ALASKA) INC. Initial Class/Type _ Well Name: PRUDHOE BAY UNIT C -31C Program DEV Well bore seg ❑ DEV _/ PEND GeoArea 890 _ Unit 11650 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven. gas conforms to AS31.05,030(j.1.A),Q.2.A-D) - - - -- NA - 1 Permit_fee attached- _ - - - - - - - - - - - - -- - - - NA_ - - - - - - - 2 Lease number appropriate- . - - - - - Yes - - - - - - Entire Well lies within ADL0028305._ - - - - - - - - - - 3 Unique well name and number - _ - -------------------------- -- Yes----------------------------- - --------------------- -------- 4 Well located in_a_defined -pool - Yes - - - - _ - PRUDHOE BAY, PRUDHOE OIL POOL - 1540115—governed by CO -341 F _ - - - - - - - - . - 5 Well located proper distance from drilling unit _boundary- - - - . - - - Yes - - - - - _ - CO 341F, Rule 2:_ There shall be no restrictions_ as to wellspacing- exceP t that_nopay shall be 6 Well located proper distance from other wells_ - - - - _ _ _ _ - - - _ Yes _ _ _ _ _ opened in a well closer than 500 feet to -the boundary_ of the a_ffected_area. Planned well conforms to CO 7 _ Sufficient acreage -available in drilling unit _ - Yes - - - - - - - 341 Ft Rule 2- - - - - - - - - - - - - - - - - - - - - - - - - - 8 if_deviated,is_wellbore plat -included ____.------- Yes --- --------------------------- --------------------------------- 9 Operator only affected party Yes 10 Operator has_appropriatebondinforce ---------------- Yes_ _-__________------------------------ ------------ -- --- ------ Appr Date 11 Permit can be issued without conservation order_ - - - - - Yes - - - . _ - - - - - - - - - - - - - - - - - - - - - - - - 12 Permit_can be issued without administrative approval _ _ _ _ _ _ - - Yes _ _ _ - _ _ - _ _ ---- - - - - - - - - - - - - - -- - -- - - - - - - - - - -------- SFD 11/15/2016 13 Can permit be approved before 15 -day wait_ _ Yes - 14 Well located within area and -strata authorized by Injection Order # (put 10# in_comments)-(For- NA_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 15 All wells -within 1/4 mile—area—of review identified (For service well only) - - - - - - - - - - - - - NA_ - - - - - - .. -- - - - - - - - - - - - - - - - - 16 Pre -produced injector: duration of pre ,production less than 3 months_ (For -service well only) - - NA- - - - - - - - - - - - - 18 Conductor string provided _ _ _ _ _ _ _ _ _ _ _ _ _ _ -- - ----------- - - -- -- N_A. Set in_ original well C-31 _ _ _ - _ _ _ - - _ _ _ _ _ Engineering 19 Surface casing_protects all_known- USDWs NA Set in original well C-31 - - . - - - - - - 20 CMT vol adequate_ to circulate -on conductor & surf csg - - - - - NA_ - Set in original well 0-31 - - - - - - 21 CMT_ vol_ adequate_ to tie -in -long string to -surf csg_ --------------- --- NA_ - - - - - - - Set in original well C-31 - - - _ - - - - - - - - - - - - - - - - - - - - - - - 22 CMT_will cover -all known -productive horizons_ Yes - - - - - - - side-track will cement_ liner_ in p _lace_ - 23 Ca sing designs adequate forC,_T,B&_permafrost_ - - - - - - _ - - - - - - - NA_ - - - - - - - - - - - - - I - - - - - - 24 Adequate tankage or reserve pit Yes yes 25 If_a_ re -drill, has_a 1.0-403 for abandonment been approved - . - - - - - - Yes Sundry -316-565 - - - - - - - - - - - - - - - - - 26 Adequate -well bore separation_ proposed _ - - - - Yes - - - - - 27 �28 If_diverter required, does it meet regulations_ - - - - - - - - - NA - - - - Wellhead in place. - BOP to be installed - Appr Date _Drilling fluid program schematic & equip list adequate_ - - - - - - - - - - - Yes . - - - - - - - _ - - - - - - - - - - - - - - - - - - - - - - MJQ 11/15/2016 29 BOPEs,_do they meet regulation - Yes - - - - - - - - 30 BOPE_press rating appropriate; test to -(put psig in comments)- - - - - - - - - - - - - - - - - - - Yes - MASP 2530 psi, 3500 psi BOP test_ - - 31 Choke -manifold complies w/API_RP-53 (May 84)_ - - - - - Yes _ - - - - - - - - - - - - - - - - - - - - - - - 32 Work will occur without operation shutdown_ - - - ------- - -------- ---- Yes - - - - - - .. Coil -tubing -sidetrack in zone - - - - - - - - - - - - - - - - - - - - - - 33 Is presence of H2S gas probable_ - - - _ - - - - - . - - - - Yes - - - - - - - H2S measures required_ - - - - - - - - - - - - - - - - - - - 34 Mechanical -condition of wells within AOR verified (For service well only) NA_ - - - - - - - - - - - - - - - - - - - - - - - - - - - 35 Permit can be issued w/o hydrogen. sulfide measures No _ _ - C -Pad wells are H2S-bearing. H2S measures -are r_equired._ _ _ _ _ _ - - Geology 36 Data_presented on potential overpressure zones _ Yes - Planned drilling-mudprogram(about 8.4 ppg) appears adequate to control operator's -forecast 37 Seismic analysis of shallow gas_zones_ ----- - - - ------- - - - - - - _NA_- - pore pressure -gradient (about 7.45 ppg). Should higher pore pressures be encountered, Appr Date 38 - - - - - - Seabed condition survey off -shore) NA_ - BP has- immediate access to nearby fluid -mixing facilities._ - - - - - _ SFD 11/15/2016 -(if - - - 39 _Contact name/phone for weekly -progress reports [exploratory only] - - - - NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ - - - - - - - - - - - . - - - - - - - - - - - - - - Geologic Engineering Public Commissioner: Date: Commissioner: Date Com i er _ , Date STATE OF ALASKA ,SKA OIL AND GAS CONSERVATION COMMISSi, PERMIT TO DRILL 20 AAC 25.005 "t tIVIED OCT 242016 Orrr* la. Type of Work: 1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1c. Specify if well is proposed for: Drill ❑ Lateral ❑ Stratigraphic Test El - Oil Z . Service - Winj ❑ Single Zone H • Coalbed Gas ❑ Gas Hydrates ❑ Redrill H . Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket ® • Single Well ❑ 11 - Well Name and Number: BP Exploration (Alaska), Inc Bond No. 29S105380 • PBU C -31C , 3 Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 13668' • TVD: 8956'ss PRUDHOE BAY, PRUDHOE "OIL 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): ADL 028305 Surface: 1800' FNL, 883' FEL, Sec. 19, T11N, R14E, UM . 8. Land Use Permit: 13. Approximate spud date: 3333' FNL, 5204' FWL, Sec. 20, T11N, R14E, UM Top of Productive Horizon: 60-274 December 1, 2016 9. Acres in Property: 14. Distance to Nearest Property: Total Depth: 4018' FNL, 3396' FWL, Sec. 20, T11N, R14E, UM 29820 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation a e ASL: 70.9 ' 15. Distance to Nearest Well Open to Same Pool: Surface: x- 664508 y- 5959422 Zone - ASP 4 GL ElevatioWsWve MS : .28 feet 7 80 16. Deviated wells: Kickoff Depth: 11165 feet 17. Maximum Anticipatel&VsKres in psig (see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Dow hole: 34 - Surface: 2530 - 18, Casing Program: Specifications Vekti,6th - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Lej1h TVD (includingstage data 3-1/4" 2-3/8" 4.7# L-80 H511 200 sS 13668' 8956'ss 85 sx Class 'G' 19. PRESENT WELL CONDITIONo be mpleted for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (me 0):ect. Dept MD (ft): Effect. Depth TVD (ft): Junk (measured): 13688 9022 12610,1340612610 9026 None Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20" 8 cu vds Concrete 37 - 117 37-117 Surface 2792 13-3/8" 3900 cu ft Permafrost 36-2828 36-2722 Intermediate 9973 9-5/8" 2335 cu ft Class 'G' 33-10006 33-7597 Liner 2082 416 cu It Class 'G' 9860-11942 7481 -9014 Liner See Attachment Perforation Depth MD (ft): 12050 - 1 Perforation Depth TVD (ft): 9014-9022 20. Attachments Property Plat ❑ i BOP Sketch 10 Drilling Program 21 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program R1 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Browninq, Zachary H from without prior written approval. Email Zachary.Browning@bp.com Printed Name John Egbeji4a Title Drillinq Supervisor Signature Phone +1 907 564 4139 Date ((� 2 =}. 20 C o Commission Use Only Permit to Drill //Permit Number: 1 / !�� API Number: 50- 029-21775-03-00 Approval Date: See cover letter for other requirements: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Other: L3,0P �r�� l-� ���© %�5 t Samples req'd: Yes ❑ No © El Mud log req'd: Yes ❑/ No Cl' [/ Q rt ��� -�� H2S measures Yes No ❑ Directional svy req'd: Yes 0 No ❑ �f 7 ZSiJU �S c� Spacing exception req'd: Yes ❑ No GJ Inclination -only svy req'd: Yes ❑ No @/ Post initial injection MIT req'd: Yes ❑ No XY APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: ORIGINAL Form 10-401 Revised 11/2015 This permit is valid for 24 months from the date of approval (20 AAC 25.005(8)) Submit Form and Attachments in Duplicate Carlisle, Samantha J (DOA) From: Quick, Michael J (DOA) Sent: Wednesday, November 02, 2016 8:29 AM To: Carlisle, Samantha J (DOA) Subject: FW: Please withdraw current Sundry and Permit to Drill request (PTD#203-008 and 216-134) How do we do this request? Michael Quick Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 (907) 793-1231 (phone) (907) 276-7542 (fax) mike.quick@alaska.go_v_ CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mike Quick at 907-793-1231 or mike.quick@alaska.clov. From: Lastufka, Joseph N [mailto:Joseph.Lastufka@bp.comj Sent: Wednesday, November 02, 2016 8:26 AM To: Quick, Michael J (DOA) <michael.quick@alaska.gov> Cc: Browning, Zachary H <Zachary.Browning@bp.com> Subject: Please withdraw current Sundry and Permit to Drill request (PTD#203-008 and 216-134) Mike, Please withdraw the current Sundry for Plug for Redrill on C-31 B (PTD# 203-008, Sundry# 316-514) and Permit to Drill for C-31 C (216-134). A new Sundry and Permit to Drill will be delivered this afternoon, with the anticipated start date of November 15th for the Sundry. If you need any additional information or have questions please let me know. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 ----------------------------------------------------------------------------------------------- BP Exploration AlaskaJ900 E. Benson Blvd.lRoom: 788DIAnchorage, AK Casing / Tubing Attachment C-31 B Casing Length Size MD ND Hole Size Cementing Record CONDUCTOR 80 20" x 30" 37 117 37 117 8 cu ds Concrete SURFACE 2792 13-3/8" 68# L-80 36 2828 36 2722 3900 ft Permafrost INTERMEDIATE 9973 9-5/8" 47# L-80 33 10006 33 7597 2335 cu ft Class 'G' LINER 2082 7" 29# L-80 9860 11942 7480 9014 416 cu ft Class 'G' LINER 145 4-1/2" 12.6# L-80 11902 - 12047 9014 9014 309 cu ft Class 'G' LINER 2322 2-3/8" 4.6# L-80 11366 13688 8781 9022 95 cu ft Class 'G' TUBING 11426 3-1/2" 9.3# L-80 31 11458 1 31 8853 To: Alaska Oil & Gas Conservation Commission From: Zach Browning CTD Engineer Date: October 21, 2016 Re: C -31C Permit to Drill Request by Approval is requested for a permit to drill a CTD sidetrack lateral from well C-31 B with a Nordic Coiled Tubing Drilling rig on or around December 1St, 2016. Planned operations: Drill a through tubing sidetrack with the Nordic 2 Coiled Tubing Drilling rig on or around December 1 st 2016. A plug will be set pre -rig isolating the C-31 B perforations. A —500' IA cement squeeze is planned to provide a cement packer since the planned sidetrack kicks off above the existing production packer. This IA squeeze is not needed to fix any integrity issue, but is needed for multiple dual string exits planned, both this one and ones in the future. The TOC (10,500' MD) is planned to provide pressure integrity in the IA above all possible sidetrack locations. A 2.80" window will be milled off the 3-1/2" whipstock set pre -rig. The well kicks -off in lower Zone 4, and will land and target reserves in Zone 1A/1 B above the HOT. The proposed sidetrack is a 2500' horizontal Ivishak producer to be completed with a 2-3/8" L-80 solid liner, cemented in place and selectively perforated. The open parent pert intervals are below the KOP and will be isolated via the plug set pre -rig as well as the liner cement job or liner top packer.* RigWork scheduled to begin December 1St, 2016 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,530 psi). 2. Mill 2.80" window. 3. Drill build: 3.25" OH, 798'(16 deg DLS planned). 4. Drill Lateral: 3.25" OH, 1685'(12 deg DLSplanned) 5. Run 2-3/8" L-80 liner leaving TOL at 11,100' MD. 6. Pump primary cementjob: 17.5bbls, 15.3 ppg Class G, TOC at TOL (11,100' MD).- D).*7. 7. Test liner lap to 2400 psi. 8. Selectively perforate. 9. Freeze protect well to a min 2,200' TVDss. 10. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(l) Post -Rig Work: 1. O: Re -install wellhouse, and flowline if needed. 2. V: Tree work as necessary. 3. S: LTP set post rig if needed, and test.* 4. S: Install LGLVs 5. C: RPM log. 6. O: NWKO Mud Program: • Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (434psi over -balance). Disposal: • All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or - Pad 3 at DS 6. • Fluids >1 % hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 3.25" for production hole section from 11,165' MD to 13,668' MD. Liner Program: • 2-3/8", 4.7 Ib/ft, H511, L-80 solid liner: 11,100' MD — 13,668' MD • A planned 17.5 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at 11,100' MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg (434 psi over -balance). • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 900 (TD), inclination at kickoff point is 290 . • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property — 29,820' (North) • Distance to nearest well within pool — 780' (C -32D) - Logging: • MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. - • Cased hole GR/CCL/RPM logs will be run inside casing (post -rig). Perforating: • Perforations: —300' of perforations, 1.56", 60 deg random phasing, 6 spf, pert guns. Anti -Collision Failures: • None. All offset wells pass BP anti -collision scan criteria. Hazards: • C -pad is not an H2S pad. Latest H2S reading on the C-31 was 23ppm on 2/4/15. • No planned fault crossings. The lost circulation risk in C -31C is considered to be LOW. Reservoir Pressure: • The reservoir pressure on E -07B is expected to be 3,410 psi at 8,800' TVDSS (7.45 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,530 psi. . • A min EMW of 8.4 ppg for this well will provide 434 psi over -balance to the reservoir. Zach Browning CC: Well File CTD Engineer Joseph Lastufka 564-5220 IELLFEAD=-_----MbEVDY SIZE C_ 31 B CTWITOR==-- BAI�tC OprVSgz 67.8' SQZ F. ELEV = 37.3' 6 12050 - 12080 O _ 50 101 atom MID = 1148T SS atuln TVD = 88W SS 13-3/8" CSG, 68#, L-80 BUTT, ID = 12.415" I 2826' Minimum ID =1.995" a@ 11372' TOP OF 2-3/8" LINER 5/8" X 7" BKR LTP w / TEBACK SLV, D = 6.187" I—i 9860- 9-5/8" X 7' BKR NSCC LNR HGR ID = 6.250" 1-� 9873' 9-5/8" CSG, 47#, L-80 NSCC/BUTT, D = 8.681" J ---j 10006' 3-1 /2" TBG, 9.3#, L-80 NSCT, .0087 bpf, D = 2.992' 1146T 7" LNR 29#, L-80 NSCT, .0371 bpf, D = 6.184" 11942' �Wh1PSTOCK W/ 2 RA TAGS12026' -112" LNR 12.6#, NT -80 NSCT, .0152 bpf, D = 3.958" —12026' PERFORATION SU IVWRY REF LOG: MWD / GR ON 04/15/03 ANGLE AT TOP PERF: 90" @ 12050' Note: Refer to Production OB for historical pert data SIZE SPF INTERVAL OprVSgz DA TE SQZ 1.56" 6 12050 - 12080 O 01/11/15 50 1.56" 6 12080 - 12110 O 01/10/15 2 156' 6 12110 - 12140 O 01/10/15 RK0 1.56" 6 12140 - 12170 O 01/10/15 29 1.56" 6 12170 - 12200 O 01/09/15 1.56" 6 12200- 12230 O 01/09/15 1-112" 4 12700 - 12760 C 04123/03 1-1/2" 4 12930 - 13355 C 04/23/03 1-112" 4 13480- 13670 C 04/23/03 SAFF" NOTES: WELL ANGLE> 70° @ 11730'. 2116' 1—{3-1/2" OTIS SSSV LAND. NIR D= 2.75 - GAS LIFT MANDRELS ST MID TVD DEV TYPE V LV LATCH PORT DATE 3 5091 14271 50 1 MUG I DMY RK 0 08/20116 2 8601 7" X 4-112" LTP w /BKR TEBACK SLV, D = 5.25" 46 MUG DMY RK0 M LOUT WINDOW 1204T - 12051' 08/20/16 1 11232 16568 8665 29 1 MUG -2 [)I— RK 0 04/30/03 9-5/8" SDETRACK WIDOW - 10006" -10056' (SECTION MILL) NOTE PRE SDTRK WELLBORE NOT SHOWN BELOW 9-5/8" ML.LOUf WIDOW. 11260'—�3-1/2" OTIS X NP, D= 2.75" 11274' 02/22/88 t' xx 3-1/2* BKR SABL-3 PKR D = 3.85' 11299' 3-1/2" OTIS X NP, D = 2,75' 11366' 08/24/16 JAR/JGLV C/O (08/20/16) 2.70" BKR DEPLOYMENT SLV , D = 2.250" 11446' 3-112" OTIS X NP, D = 2.75' 11467' — 3-1/2' WLEG, D=2.992'1 11466' — —"D Tr BOGGED 10/69%98 11660' TOP OF CEMENT 11884' 7" X 4 1/2" BKR H LNR TOP PKR D= 4.44" 11902' 7" X 4-112" LTP w /BKR TEBACK SLV, D = 5.25" 11916' —{7" X 4-1/2" BKR LNR HGP, D = 4.37" M LOUT WINDOW 1204T - 12051' 12610' I—j2-3/8"WFDCJBP(10/12/15) 13400' 1--12-318" CIBP(01/08/14) 13674' H PBTD 2-3/$" LNR, 4.6#, L-80 STL, _0039 bpf, D = 1.995" 1—{ 13688' 1 DATE REV BY COWAENTS DATE REV BY COMUENTS 02/22/88 NI 8E ORIGINAL COMPLETION 11/09/15 ATO/JSETCBP(10/12/15) 03/11195 D44 RIG SIDETRACK (C -31A) 08/24/16 JAR/JGLV C/O (08/20/16) 04/24/03 DAV/KK CTD SIDETRACK (C-31 B) 03/20/14 RB/JMD TREE C/O (03/18/14) 02/10/15 MSSJJ ADPER -S (01/09-11/15) 02110/15 JMD IWBS CLEANED LIP PER TALLES PRIM -OE BAY LINT WB -L: C -31B PERMIT W '2030080 AR No: 50-029-21775-02 SEC 19, T11 N, R14E, 1800' FNL & 883' FEL BP Exploration (Alaska) EL.LFEAD= KtEVOY PROPO CTUATOR = KB. ELEV = 67.8' =. ELEV = 3TS DP= 1700' ax Angle atum MD = Aum TVD = 880�Ss 13-3/8" CSG, 68#, L-80 BUTT, ID = 12-415" I-1 2825' Minimum ID =1.995" @ 11372' TOP OF 2-3/8" LINER 5/8" X 7" BKR LTP w / TNEBACK SLV, D = 6.187" 9860' 9-5/8" X 7" BKR NSCC LNR HGR ID = 6.250" 9873' 9-5/8" CSG, 47#, L-80 NSCUBUTT, D = 8.681" 1 10006' TOC 10500' 2-3/8" TOL 11100° 3-1/2" W-IPSTOCK (�/ / , 11165' 3-1/2" Cement Retainer 11230' 3-1/2" OTIS X NP, 13=2.75^ 11260' 3-1 /2" TBG, 9.3#, L-80 NSCT, .0087 bpf, D = 2-992" 11457' 7" LNR, 29#, L-80 NSCT, .0371 bpf, D = 6.184" 11942' JWHIPSTOCK W/ 2 RA TAGS 12025' -1/2" LNR 12.6#, NT -80 NSCT, .0152 bpf, D = 3.958" - 12025' PERFORATION SUMMARY REF LOG: ON —1-1_ ANGLEAT TOP PERF_ @ Note: Refer to Production DB for historical pert data SIZE ISPFI INTERVAL I ODNSgZ I DATE SQz V -31SAFES" NOTES: WELL ANGLE> 70° @ -'j"r1 2115' 1-13-1/2" OTIS SSSV LAND. NP, D = 2.75" GAS LET MANDRELS ST MD TVD DEV TYPE I V LV LATCH PORT!04/3!0/03 03/11/95 3 5091 4271 50 MMG DMY RK 0 6 2 8601 I BUILT PROPOSAL 46 MMG DMY RK 0 6 1 11232 16568 8665 29 MMG-2 DMY RK 0 9-5/8" SIDETRACK WINDOW - 10006' -10056' (SECTION MLL) NOTE PRE-SDTRK WELLBORE NOT SHOWN BELOW 9-5/8" MILLOUT WINDOW. 11100' —12.70" DEPLOYMENT SLEEVE, D = __" MLLOUr WINDOW (G-31 C) 11165'- 11175' PUP JT w /RA TAG I 2-3/8" LNR, 4.7#, L-80 H511, 13668' .0039 bpf, D = 1.995' A LLOUT WIDOW 12047'- 12051' PBTD 13674' 2-3/8" LNR, 4.6#, L-80 STL, .0039 bpf, D = 1-995"13688' DATE REV BY COMMENTS DATE REV BY COMMENTS 02122/88 N18E ORIGINAL COMPLETION 03/11/95 D-14 RIG SIDETRACK (C -31A) 04/24/03 DAV/KK CTD SIDETRACK (C -31B) _/% CTD SIDETRACK (C -31C) 109/08/161 JMD I BUILT PROPOSAL PRIDHOE BAY UNIT WELL: C-31: PERMIT No: API No: 50-029-21775-0:'. SEC 19, T11 N, R14F-1800' FNL 8 883' FEL BP Exploration (Alaska) bp North America - ALASKA - BP Prudhoe Bay PB C Pad C-31 C-31 C Plan: C -31C WP04 BP Coil Tubing Report 19 October, 2016 Flu BAKER HUGHES wood h BP //.&2 1000 by BP Coil Tubing Report From: BAKER Easting: Position Uncertainty: 0.00 usft HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well C-31 Well Position Project: Prudhoe Bay TVD Reference: Mean Sea Level +E/ -W 0.00 usft Site: PB C Pad MD Reference: C-31A/B OKB @ 70.90usft - Wellhead Elevation: Well: C-31 North Reference: True , Magnetics Wellbore: C -31C Survey Calculation Method: Minimum Curvature BGGM2016 12/1/2016 Design: C -31C WP04 Database: EDM R5K-Alaska PROD -ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB C Pad, TR -11-14 Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 usft Slot Radius: Well C-31, C-31 Well Position +N/ -S 0.00 usft Northing: +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore C-31 C Magnetics Model Name Sample Date Declination (°) BGGM2016 12/1/2016 18.16 Design C -31C WP04 Audit Notes: Version: Phase: PLAN Tie On I Vertical Section: Depth From (TVD) +N/ -S +E/ -W (usft) (usft) (usft) -38.98 0.00 0.00 5,957,218.720 usft Latitude: 70° 17'22.367 N 662,550.030 usft Longitude: 148° 41'2.797 W 0.000 in Grid Convergence: 1.24 ° 5,959,422.000 usft - Latitude: 70° 17'43.614 N 664,508.000 usft Longitude: 148° 40'4.350 W 38.98 usft Ground Level: 37.28 usft Di Angle Dip g Field Strength (°) (nT) 81.01 57,558 h: 11, 039.39 Direction 75.00 10/19/2016 1:35:26PM Page 2 COMPASS 5000.1 Build 81B .+ TVDSS BP A100"Ir, (usft) (°) BP Coil Tubing Report Company: North America - ALASKA - BP 28.21 Local Co-ordinate Reference: Project: Prudhoe Bay 11,100.00 TVD Reference: Site: PB C Pad 28.79 MD Reference: Well: C-31 11,165.00 - North Reference: Wellbore: C -31C 11,185.00 Survey Calculation Method: Design: C -31C WP04 0.00 Database: Survey Tool Program Date 10/19/2016 11,235.00 19.18 From To 5,958,354.077 11,300.00 (usft) (usft) Survey (Wellbore) Tool Name Description 50.00 9,944.80 GCT (C-31 PB1) GCT -MS Schlumberger GCT multishot 9,987.00 11,039.39 2: MWD - Standard (C -31A) MWD MWD - Standard 11,039.39 13,668.00 C-31 C WP04 (C-31 C) MWD MWD - Standard Planned Survey TVDSS MD Inc E/W (usft) (°) Easting 11,039.39 28.21 C-31AActual Survey (usft) 11,100.00 28.58 11,133.32 28.79 C-31AActual Survey TIP (usft) 11,165.00 - 28.98 KOP - 3 1/2" Planned TOWS 11,185.00 27.18 End 9Deg/100ft 0.00 11,200.00 24.78 11,235.00 19.18 5 5,958,354.077 11,300.00 28.64 11,335.00 33.95 6 -1,213.13 11,400.00 36.19 11,500.00 43.84 11,600.00 54.57 11,635.00 58.74 7 5,958,325.528 11,700.00 69.00 11,800.00 84.81 Well C-31 Mean Sea Level C-31A/B OKB @ 70.90usft True Minimum Curvature EDM R5K-Alaska PROD-ANCP1 Azi TVDSS N/S E/W Northing Easting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 157.42 8,425.66 -1,171.80 5,933.20 5,958,380.420 670,465.016 0.00 5,427.75 157.21 8,478.98 -1,198.39 5,944.32 5,958,354.077 670,476.713 0.64 5,431.61 157.09 8,508.21 -1,213.13 5,950.53 5,958,339.479 670,483.245 0.64 5,433.79 156.90 8,535.95 -1,227.22 5,956.51 5,958,325.528 670,489.532 0.67 5,435.92 156.90 8,553.59 -1,235.87 5,960.21 5,958,316.953 670,493.414 9.00 5,437.25 156.90 8,567.07 -1,241.92 5,962.78 5,958,310.967 670,496.123 16.00 156.90 8,599.52 -1,253.96 5,967.92 5,958,299.039 670,501.523 16.00 167.75 8,658.90 -1,279.08 5,975.44 5,958,274.096 670,509.585 16.00 171.19 8,688.80 -1,296.95 5,978.72 5,958,256.302 670,513.255 16.00 188.92 8,742.13 -1,333.95 5,978.52 5,958,219.311 670,513.871 16.00 210.94 8,819.05 -1,393.20 5,955.99 5,958,159.583 670,492.646 16.00 226.71 8,884.53 -1,451.21 5,908.22 5,958,100.542 670,446.158 16.00 231.18 8,903.77 -1,470.38 5,886.17 5,958,080.895 670,424.530 16.00 233.11 8,932.36 -1,506.11 5,840.13 5,958,044.171 670,379.287 16.00 235.63 8,954.94 -1,562.61 5,761.18 5,957,985.959 670,301.601 16.00 MAP a2 BAKER HUGHES TFace (°1 0.00 -15.33 -15.15 -25.87 180.00 5,438.17 -180.00 5,440.02 180.( 5,440.78 30.00 5,439.32 20.04 5,429.56 85.00 5,392.46 70.45 5,331.30 53.45 5,305.04 43.07 5,251.32 10.00 5,160.44 9.15 10/19/2016 1:35:26PM Page 3 COMPASS 5000.1 Build 81B by Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C -31C Design: C -31C WP04 Planned Survey MD (usft) 11,833.00 8 11,900.00 11,983.00 End 16deg/100ft 12,000.00 12,100.00 12,200.00 12,243.00 10 12,300.00 12,318.00 11 12,400.00 12,500.00 12,600.00 12,618.00 12 12, 700.00 12,800.00 12,900.00 12,918.00 13 13,000.00 13,100.00 13,200.00 13,218.00 14 BP BP Coil Tubing Report Local Co-ordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Inc Azi TVDSS N/S EIW Northing Easting (usft) (usft) (usft) (usft) (usft) 90.03 236.42 8,956.43 -1,581.03 5,733.85 5,957,966.949 670,274.684 90.03 247.14 8,956.39 -1,612.67 5,674.90 5,957,934.029 670,216.447 90.03 260.42 8,956.34 -1,635.81 5,595.39 5,957,909.157 670,137.462 90.03 262.46 8,956.33 -1,638.34 5,578.58 5,957,906.258 670,120.713 90.03 274.46 8,956.28 -1,641.03 5,478.80 5,957,901.385 670,021.022 90.03 286.46 8,956.23 -1,622.92 5,380.64 5,957,917.344 669,922.496 90.03 291.62 8,956.21 -1,608.90 5,340.00 5,957,930.471 669,881.566 90.03 298.46 8,956.18 -1,584.79 5,288.39 5,957,953.440 669,829.441 90.03 300.62 8,956.17 -1,575.92 5,272.73 5,957,961.968 669,813.591 90.03 290.78 8,956.13 -1,540.41 5,198.93 5,957,995.852 669,739.037 90.02 278.78 8,956.09 -1,514.95 5,102.41 5,958,019.188 669,641.993 90.02 266.78 8,956.05 -1,510.12 5,002.71 5,958,021.838 669,542.217 90.02 264.62 8,956.04 -1,511.47 4,984.76 5,958,020.094 669,524.304 90.02 254.78 8,956.01 -1,526.12 4,904.19 5,958,003.685 669,444.071 90.02 242.78 8,955.98 -1,562.26 4,811.14 5,957,965.524 669,351.845 90.02 230.78 8,955.95 -1,616.95 4,727.64 5,957,909.021 669,269.567 90.02 228.62 8,955.94 -1,628.59 4,713.91 5,957,897.081 669,256.100 90.02 218.78 8,955.92 -1,687.81 4,657.33 5,957,836.646 669,200.835 90.02 206.78 8,955.89 -1,771.73 4,603.30 5,957,751.563 669,148.653 90.01 194.78 8,955.86 -1,865.06 4,567.89 5,957,657.490 669,115.301 90.01 192.62 8,955.86 -1,882.55 4,563.63 5,957,639.915 669,111.424 Well C-31 Mean Sea Level C-31A/B OKB @ 70.90usft True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 DLeg (°I100usft) 16.00 16.00 16.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 V. Sec (usft) 5,129.27 5,064.15 4,981.35 4,964.46 4,867.38 4,777.25 4,741.63 4,698.02 4,685.19 4,623.09 4,536.45 4,441.40 4,423.71 4,342.09 4,242.86 4,148.05 4,131.78 4,061.80 3,987.89 3,929.53 3,920.89 WEaa BAKER HUGHES TFace 8.57 90.L 90.01 90.00 90.00 90.01 90.01 90.00 90.00 -90.00 -90.00 -90.01 -90.0 -90.00 -90.00 -90.01 -90.01 -90.00 -90.00 -90.01 -90.01 10/19/2016 1:35.26PM Page 4 COMPASS 5000.1 Build 81B .!'� b BP reArs e♦ BP Coil Tubing Report BAKER HUGHES Company: NorthAmerica- ALASKA - BP Project: Prudhoe Bay N/S Site: PB C Pad Northing Well: C-31 DLeg Wellbore: C -31C TFace Design: C -31C WP04 (usft) Planned Survey (usft) MD Inc (usft) (usft) (°) (usft) 13,300.00 90.01 13,400.00 90.01 13,500.00 90.01 13,518.00 90.01 15 90.00 13,600.00 90.01 13,668.00 90.01 TD at 13668.00 669,042.839 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well C-31 Mean Sea Level C-31A/B OKB @ 70.90usft True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (°) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) (°) 202.46 8,955.84 -1,960.64 4,538.96 5,957,561.306 669,088.465 12.00 3,876.84 90.00 214.46 8,955.81 -2,048.40 4,491.39 5,957,472.534 669,042.839 12.00 3,808.19 90.f 226.46 8,955.79 -2,124.35 4,426.63 5,957,395.187 668,979.755 12.00 3,725.97 90.01 228.62 8,955.79 -2,136.50 4,413.35 5,957,382.749 668,966.747 12.00 3,710.00 90.01 238.46 8,955.77 -2,185.18 4,347.48 5,957,332.647 668,901.967 12.00 3,633.78 90.00 246.62 8,955.76 -2,216.51 4,287.20 5,957,300.003 668,842.387 12.00 3,567.44 90.00 10/19/2016 1:35.26PM Page 5 COMPASS 5000.1 Build 818 BP At, bp BP Coil Tubing Report Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB C Pad Well: C-31 Wellbore: C -31C Design: C -31C WP04 Targets Target Name hit/miss target Dip Angle Dip Dir. TVD +N/ -S Shape (°) (°) (usft) (usft) C -31C T.3 0.00 0.00 8,955.00 -1,687.43 plan misses target center by 1.27usft at 13000.14usft MD (8955.92 TVD, -1687.91 N, 4657.25 E) Point C -31C Fault 1 0.00 0.00 -72.13 -1,465.70 plan misses target center by 8776.67usft at 11039.39usft MD (8425.66 TVD, -1171.80 N, 5933.20 E) Polygon Point 1 -72.13 0.00 Point 2 -72.13 246.29 Point 3 -72.13 553.22 Point 4 -72.13 246.29 C-31CFault 2 0.00 0.00 -72.13 -1,467.34 plan misses target center by 8706.57usft at 11039.39usft MD (8425.66 TVD, -1171.80 N, 5933.20 E) Polygon Point 1 -72.13 0.00 Point 2 -72.13 -443.42 Point 3 -72.13 -1,140.13 Point 4 -72.13 -443.42 C -31C KOP 0.00 0.00 8,535.00 -1,226.73 plan misses target center by 0.31usft at 11163.86usft MD (8534.95 TVD, -1226.71 N, 5956.30 E) Point C -31C Fault 3 0.00 0.00 -72.13 -2,447.98 plan misses target center by 8791.34usft at 11039.39usft MD (8425.66 TVD, -1171.80 N, 5933.20 E) Polygon Point 1 -72.13 0.00 Point 2 -72.13 -258.47 C -31C T.4 0.00 0.00 8,955.00 -2,216.51 plan misses target center by 0.85usft at 13668.00usft MD (8955.76 TVD, -2216.51 N, 4287.20 E) Point C -31C Polygon 0.00 0.00 -72.13 -1,323.55 plan misses target center by 8499.51 usft at 11039.39usft MD (8425.66 TVD, -1171.80 N, 5933.20 E) Polygon Point 1 -72.13 0.00 Point 2 -72.13 -219.12 10/19/2016 1:35.26PM Page 6 +E/ -W (usft) 4,656.51 3,758.08 0.00 1,497.85 2,190.78 1,497.85 4,061.14 0.00 -32.71 -193.01 -32.71 5,955.99 4,076.68 0.00 2,211.03 4,286.81 5,854.84 0.00 -1,414.23 ri.a BAKER HUGHES Local Co-ordinate Reference: Well C-31 TVD Reference: Mean Sea Level MD Reference: C-31A/B OKB @ 70.90usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Northing Easting (usft) (usft) Latitude Longitude 5,957,837.000 669,200.000 70° 17'27.004 N 148° 37'48.660 W 5, 958, 039.000 5,958,039.00 5,958,318.00 5, 958, 640.00 5, 958, 318.00 5, 958, 044.000 5,958,044.00 5,957,600.00 5, 956, 900.00 5, 957, 600.00 5, 958, 326.000 5, 957, 064.000 5, 957, 064.00 5, 956, 854.00 5,957,300.000 5, 958, 227.000 5,958,227.00 5,957,977.00 668,297.000 70° 17' 29.190 N 148° 38' 14.837 W 668,297.00 669, 789.00 670,475.00 669, 789.00 668,600.000 70° 17' 29.172 N 148° 38'6.005 W 668,600.00 668, 577.00 668,432.00 668, 577.00 670,489.000 70° 17' 31.526 N 148° 37' 10.782 W 668,637.000 70° 17' 19.527 N 148° 38'5.568 W 668,637.00 670,853.00 668,842.000 70° 17' 21.803 N 148° 37'59.441 W 670,390.000 70° 17'30.574 N 148° 37' 13.732 W 670,390.00 668, 981.00 COMPASS 5000.1 Build 81B h BP Z �Jp BP Coil Tubing Report ti Well C-31 TVD Reference: Mean Sea Level MD Reference: C-31A/B OKB @ 70.90usft North Reference: Company: NorthAmerica - ALASKA - BP Database: EDM R5K - Alaska PROD - ANCP1 5,957,280.00 668,796.00 Project: Prudhoe Bay 5,957,706.00 669,324.00 5,957,842.00 669,881.00 5,957,758.00 Site: PB C Pad 670,499.00 5,957,996.000 669,738.000 70° 17'28.448 N 148° 37'32.881 W 5,958,001.000 670,321.000 70° 17'28.368 N 148° 37' 15.892 W Well: C-31 Wellbore: C -31C Design: C -31C WP04 Point 3 -72.13 -911.95 -1,614.46 Point 4 -72.13 -993.66 -1,263.14 Point 5 -72.13 -497.58 -1,077.22 Point 6 -72.13 -373.79 -517.34 Point 7 -72.13 -468.15 -45.26 Point 8 -72.13 -275.34 103.01 C -31C T.2 0.00 0.00 8,955.00 -1,540.24 5,197.90 plan misses target center by 1.15usft at 12401.04usft MD (8956.13 TVD, -1540.04 N, 5197.95 E) Point C -31C T.1 0.00 0.00 8,951.00 -1,548.00 5,780.91 plan misses target center by 1.17usft at 11775.12usft MD (8951.84 TVD, -1548.57 N, 5781.48 E) Point Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 11,039.39 8,425.66 -1,171.80 5,933.20 C-31AActual Survey 11,133.32 8,508.21 -1,213.13 5,950.53 C-31AActual Survey TIP 11,165.00 8,535.95 -1,227.22 5,956.51 KOP 11,185.00 8,553.59 -1,235.87 5,960.21 End 9Deg/100ft 11,235.00 8,599.52 -1,253.96 5,967.92 5 11,335.00 8,688.80 -1,296.95 5,978.72 6 11,635.00 8,903.77 -1,470.38 5,886.17 7 11,833.00 8,956.43 -1,581.03 5,733.85 8 11,983.00 8,956.34 -1,635.81 5,595.39 End 16deg/100ft 12,243.00 8,956.21 -1,608.90 5,340.00 10 12,318.00 8,956.17 -1,575.92 5,272.73 11 12,618.00 8,956.04 -1,511.47 4,984.76 12 12,918.00 8,955.94 -1,628.59 4,713.91 13 13,218.00 8,955.86 -1,882.55 4,563.63 14 13,518.00 8,955.79 -2,136.50 4,413.35 15 13,668.00 8,955.76 -2,216.51 4,287.20 TD at 13668.00 Fi.a BAKER HUGHES Local Co-ordinate Reference: Well C-31 TVD Reference: Mean Sea Level MD Reference: C-31A/B OKB @ 70.90usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 5,957,280.00 668,796.00 5,957,206.00 669,149.00 5,957,706.00 669,324.00 5,957,842.00 669,881.00 5,957,758.00 670,355.00 5,957,954.00 670,499.00 5,957,996.000 669,738.000 70° 17'28.448 N 148° 37'32.881 W 5,958,001.000 670,321.000 70° 17'28.368 N 148° 37' 15.892 W 10/19/2016 1:35:26PM Page 7 COMPASS 5000.1 Build 81B nzimuhcmTnnNam, Project: prudhoeBay WELLBORE DETAILS: C -31C Mea���nn:le.i j Site: PBC Pad Maenefic Field C-310 Well: C-31 Strarigrts7557.8s Wellbore: C -31C MpAno..81.01 parent Wellbore: C -31A Plan: C31C WP04(C311C-31C) Mmd e�c�i Tie on MD: 11039.39 852 858 864 870 CD 876 Ll 885 d) Q 888 894 900 tom. 906 912 -20( 40( -60( -80( c N �= -120C cv. + -140C t-160( O � . ,180C 0 -2000 rn -220C -2400 -2600 -2800 -3000 RtFtNtWt:INFUKMA 1IVN Coordinate(NIE) Reference: Well C-31, True North vertical (TVD) Reference: Mean Sea Level Section(VS)Refererce: Slot-(0.00N,0.00E) Meesurad Depth Reference: C3IAIB0KB@70.90usft Calculation Method: Minimum Curvature ! WELL DETAILS: C-31 j C1� -31 C 1' I -1 I n p-- - I4I4 4� Ground Level: 37.28 31CFau�131CFault2 +N/ -S +E/ -W Northing Easting LatBWde Longitude Slot C3 -31 0.00 0.00 5959422.000 664508.000 70017'43.614N 148°40'4.350W --- SECTION DETAILS ANNOTATIONS Sec MD Inc Azi SSTVD+WS +E/ -W Dleg TFace VSect Target TVD MD Annotation 31C j 1 11039.39 28.21 157.42 8425.66 .1171.80 5933.20 0.00 0.00 5427.75 8425.66 11039.39 C -31A Actual Survey 2 11133.32 28.79 157.09 8508.21 -1213.13 5950.53 0.64 -15.33 5433.79 8508.21 11133.32 C -31A Actual Survey TIP 3 11165.00 28.98 156.90 8535.95 -1227.22 5956.51 0.67 -25.87 5435.92 8535.95 11165.00 KOP 4 11185.00 27.18 156.90 8553.59 -1235.87 5960.21 9.00 180.00 5437.25 8553.59 11185.00 End9Deg/100ft 5 11235.00 19.18 156.90 8599.52 -1253.96 5967.92 16.00 180.00 5440.02 8599.52 11235.00 5 6 11335.00 33.95 171.19 8688.80 -1296.95 5978.72 16.00 30.00 5439.32 8688.80 11335.00 6 7 11635.00 58.74 231.18 8903.77 -1470.38 5886.17 16.00 85.00 5305.04 8903.77 11635.00 7 8 11833.00 90.03 236.42 8956.43 -1581.03 5733.85 16.00 10.00 5129.27 8956.43 11833.00 8 9 11983.00 90.03 260A2 8956.34 -1635.81 5595.39 16.00 90.00 4981.35 8956.34 11983.00 End 16deg1100ft 10 12243.00 90.03 291.62 8956.21 -1608.90 5340.00 12.00 90.00 4741.63 8956.21 12243.00 10 11 12318.00 90.03 300.62 8956.17 -1575.92 5272.73 12.00 90.00 4685.19 8956.17 12318.00 11 12 12618.00 90.02 264.62 8956.04 -1511.47 4984.76 12.00 -90.00 4423.71 8956.04 12618.00 12 13 12918.00 90.02 228.62 8955.94 -1628.59 4713.91 12.00 -90.00 4131.78 8955.94 12918.00 13 14 13218.00 90.01 192.62 8955.86 -1882.55 4563.63 12.00 -90.00 3920.89 8955.86 13218.00 14 15 13518.00 90.01 228.62 8955.79 -2136.50 4413.35 12.00 90.00 3710.00 8955.79 13518.00 15 16 13668.00 90.01 246.62 8955.76 -2216.51 4287.20 12.00 90.00 3567.44 8955.76 13668.00 TD at 13668.00 852 858 864 870 CD 876 Ll 885 d) Q 888 894 900 tom. 906 912 -20( 40( -60( -80( c N �= -120C cv. + -140C t-160( O � . ,180C 0 -2000 rn -220C -2400 -2600 -2800 -3000 RtFtNtWt:INFUKMA 1IVN Coordinate(NIE) Reference: Well C-31, True North vertical (TVD) Reference: Mean Sea Level Section(VS)Refererce: Slot-(0.00N,0.00E) Meesurad Depth Reference: C3IAIB0KB@70.90usft Calculation Method: Minimum Curvature �� TO BAKER HUGHES 3600 3800 4000 4200 4400 4600 4800 5000 5200 5400 5600 5800 6000 6200 6400 6600 6800 7000 7200 West( -)/East(+) (200 usft/in) ! i I --- C-31 i j C1� -31 C 1' I -1 I n p-- - I4I4 4� T 31CFau�131CFault2 j C-31 - C3 -31 I - --- --- �� TO BAKER HUGHES 3600 3800 4000 4200 4400 4600 4800 5000 5200 5400 5600 5800 6000 6200 6400 6600 6800 7000 7200 West( -)/East(+) (200 usft/in) nuu 310u 52du 525u 534U 34UU 5400 5520 5580 564U 5700 5760 5820 5880 Vertical Section at 75.00° (60 usft/in) 4 4� T I t 31/C � 31C --- iCT.3 - -- -I T-- TTT i __ - -._. C.31G31B I I I n4en unn z��n on voen ,,,� ...,.�.,,,._:� nuu 310u 52du 525u 534U 34UU 5400 5520 5580 564U 5700 5760 5820 5880 Vertical Section at 75.00° (60 usft/in) 4 nz.o WT—Nadh WELLBORE DLIAILS: C -31C NtrtNtNCtmrurcmnnuN Project: Prudhoe Bay MegreM g.wlB.ls ��.. Site: PBCPad Mapretic Feu C -31C Co-adinafa (NIE)Referanca: Well C-31, True North Well: C-31 St rgh 57M7..In Vencal(TVD) Reference: Mean Sea Level Wellbore: C -31C DlpAnele:el.01 Seciion(VS)Refemrae: SO- (O.00N, O.00E) BAKER DeW: 17HB71 Parent Wellbore: C -31A Measured th Reference: C-31AIBOKB 70.90us0 ` `' Plan: C�1C WP041C•311C•31C) --Wdd:ar cMm1 Tie on MD: 11039.39 Cabulation Method: MinimumCumtum HUGHES BAKER Mean Sea West( -)/East(+) (100 usf /in) Project: Prudhoe Bay Site: PB Pad Well: C-31 Ubp' Wellbore: C -31C Plan: C -31C WP04 (C -31/C -31C) ANTI -COLLISION SETTINGS COMPANY DETAILS: North America -ALASKA - BP Interpolation Method: MD, interval: 25.00 Calculation Method: Minimum Curvature Depth Range From: 11039.39 To 13668.00 Error System: ISCWSA Results Limited By: Centre Distance: 1563.61 Scan Method: Trac Cylinder North Reference: Plan: C -31C WP04 (C -31/C -31C) Error Surface: Elliptical Conic 360 Warnin0 Method: Rules Based 380 �, I III II II XI/1 q LEGEND 360 15-02, 15-02A, 15-02A V7 + C-12, 72C, C -12C V0 C -1 G2, C-12CPB1, C-12CP131 VO 340 / C-31li, C-31, C -31A, C -31A V1 C-31, C-31, C-31 V3 �I Ill I- + C-31, C-31 P81, C-31PB1 VO 320C-31, C-3113, C -31B V2 C-32, C-32, C32 V1 -} C-32, C -32A, C -32A V2 300 J a C-32, C32D, C -32D VO I - - C-32, C-328, C -32B V3 - C-32, C-32DPB1, C-32DP131 VO 280 - .. _. ,.. �I + C-32, C -32C, C -32C V2 i', lig' - C-41, C-41AP131, C-41APB1 V5 + C-41 C -41A C -41A V10 —260- [ N O240 IIS„ o IIIiI C O 220 m � I � C1 200 I I I III � O VIII 180 U 0 160- 60140120Passible 140- 120- PossibleOffset Well 100 Magnetic Interference: C -32C uncertainty Ellipse From To 8o KOP - 11,450' MD 60 40- 0C-31A C-31A 20 O O O V O O O O O O O O O O O O O O O O O O O O O O o O O O O O O O O Measured Depth (100 usft/in) O O O O O O O O O o O O O O O O O O O O O rrA-V BAKER HUGHES Frofect: Prudhoe Bay ANTI -COLLISION SETTINGS Site: COMPANY DETAILS: North America -ALASKA - BP/�1� %•/ bp PB C Pad Well: C-31 Interpolation Method: interval: 2366 Calculation Method: Error Minimum Curvature BAKER Depth Range From: 110MID 13668.3 System: ISCWSA Wellbore: C -31C Results Limited By: Centre Distance: 1563.61 Centre D to Scan Method: Tray. Cylinder North MUGNES Plan: C -31C WP04(C-31/C-31C) Reference: Plan: C -31C WP04 (C -31/C -31C) Error Surface: Elliptical Conic __ _ Warning Method: Rules Based Ground Level: 37.28 Depth Range: 11039.39 To 13668.00 From .N/4 +EI4N Colour To MD 0.00 0.00 Northing Essting Latittude Longitude 5959422000 664508.000 70°17'43.614N 148.40'4.360W slot Possible Magnetic Interference: 11039 11450 Sec MD 1 11039.39 Inc Azi TVD +N/ -S 28.21 +E/ -W Dleg TFace VSect From KOP to 11,450' MD -----_., 11450 2 11133.32 157.42 8425.66 -1171.80 28.79 157.09 8506.21 -1213.13 5933.20 5950.53 0.00 0.64 0.00 5427.75 -15.33 5433.79 34 0 11600 3 11165.00 28.98 156.90 8535.95 -1227.22 5956.51 0.67 -25.87 5435.92 11600 12700 411185.00 27.18 156.90 8553.59 -1235.87 5960.21 9.00 180.00 5437.25 90 5 11235.00 19.18 156.90 8599.52 -1253.96 5967.92 16.00 180.00 5440.02 6 11335.00 33.95 171.19 8688.80 -1296.95 5978.72 16.00 30.00 5439.32. _ 12700 _ - 13000 7 11635.00 58.74 231.18 8903.77 -1470.38 5886.17 16.00 85.00 5305.04 \ 8 11833.00 90.03 236.42 8956.43 -1581.03 5733.85 16.00 10.00 5129.27 32 80 8 13668 9 11983.00 90.03 260.42 8956.34 -1635.81 5595.39 16.00 90.00 4981.35 " 10 12243.00 90.03 291.62 8956.21 -1608.90 5340.00 12.00 90.00 4741.63 11 12318.00 90.03 300.62 8956.17 -1575.92 5272.73 12.00 90.00 4685.19 70 12 12618.00 90.02 264.62 8956.04 -1511.47 4984.76 12.00 -90.00 4423.71 13 12918.00 90.02 228.62 8955.94 -1628.59 4713.91 12.00 -90.00 4131.78 )"a p 14 13218.00 90.01 192.62 8955.86 -1882.55 4563.63 12.00 -90.00 3920.89 te 31 C 4 15 13518.00 90.01228.62 8955.79 -2136.50 4413.35 12.00 90.00 3710.00 60 16 13668.00 90.01 246.62 8955.76 -2216.51 4287.20 12.00 90.00 3567.44 300 60 50 �� 40 Depth From Depth Ta Smey/Plan Tool 50.00 9944.80 GCT(C-31P81) GCT -MS " 30 9987.00 11039.39 2: MWD- Standard (C -31A) MWD 11039.39 13668.00 C -31C WP04 (C -31C) MWD 28UI 20 O 34 4 0 1 - 90 32 40 1103 1 1122 260 11275 374' 14,18 32C so 20 6 1,14 C- 1B 1 0 C 31A 30 80 C-31 C WP04 1149 �� 40 j 4 C- 1A 90 240 50 11 39� 114 120 3744 Mea°� 60 1152 C 31A LEGEND 80 'C-3 B 70 � 15-02,15-02A, 1s-0 v7 � 1156 Contact C-12, C -12c C-1�2c,1� -r C-12 C-12CPB1'C�r4 61 vo 120 " 120 JoseVazquez-SuppotWeo: n 80 40 4339 Cell 714-078 339 Cell Phone - C-31, C -31A, C-31AV1 907-341-7604 Emergency - C-31, C-31, Cal v3 160 YoshaRagbirsingh- SurveyManager 90 _� / - C-31, Ca1PB1, C.11131 Vo 907-342-2436 Cell Phone -�-Ca1,Cale,C-31BV2 C -31C Tai Staurdivant-0DCoordinator 2 / w Cat, C-32, C-32 V1 22 200 140 907Cell Phone ,-T60 .-Ca2,C-32A,C-32AV2 Patrick Rideerr - MWD WD Coordinator 100 - C-32, C -32D, C -32D V0 907-952-3497 Cell Phone 180 a C-32, C-3213, C -32B V3s 20 60 Carl Ulrich- Operations Manager- 907-382-5534 Cell Phone Azimuth from North[1vsCentretoCentreSeparation[10usft/in] C-32, Ca2C, C -32C V2 C-32, C-32DPB1, C-32DP61 Vo 240 180-C41,C-01APB1,C41APB1V5 Azimuth from North [°]vsCentre to Centre Separation [40usfVin] b p North America -ALASKA - BP Prudhoe Bay PB C Pad C-31 500292177500 C-31 C C-31 C WP04 Travelling Cylinder Report 19 October, 2016 FMA Pp' BAKER HUGHES bBP W/.Fa/ Op Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00 usft Reference Well: C-31 Well Error: 0.00 usft Reference Wellbore C -31C Reference Design: C -31C WP04 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well C-31 Mean Sea Level C-31A/B OKB @ 70.90usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference C-31 C WP04 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 2004 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 11,039.39 to 13,668.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,563.61 usft Error Surface: Elliptical Conic Survey Tool Program From (usft) 50.00 9,987.00 11, 039.39 Casing Points Summary Date 10/19/2016 Vertical Centre to To Hole Depth (usft) Survey (Wellbore) Tool Name Description 9,944.80 GCT (C-31 PB1) GCT -MS Schlumberger GCT multishot 11,039.39 2 : MWD - Standard (C -31A) MWD MWD - Standard 13,668.00 C-31 C WP04 (C-31 C) MWD MWD -Standard Measured Vertical Centre to Casing Hole Depth Depth Distance Deviation Warning Diameter Diameter (usft) (usft) Name (in) (in) 2,828.12 2,651.30 13 3/8" 13.375 17.500 10,006.00 7,525.83 9 5/8" 9.625 12.250 11,165.00 8,535.95 3 1/2" Planned TOWS 3.500 3.500 13,668.00 8,955.76 2 3/8" 2.375 3.250 Site Name Offset Well - Wellbore - Design PB C Pad C-01 - C-01 B- C-01 B C-01 - C-01 BPB1 - C-01 BPB1 C-02 - C -02A - C -02A C-08 - C-08 - C-08 C-08 - C -08A - C -08A C-08 - C-08AP81 - C-08APB1 C-08 - C -08B - C -08B C-08 - C-08BPB1 - C-08BPB1 C-08 - C -08C - C -08C C-08 - C-08CPB1 - C-08CPB1 C-08 - C-08CPB2 - C-08CPB2 C-12 - C -12C - C -12C C-12 - C-12CPB1 - C-12CP61 C-29 - C -29A - C -29A C-29 - C -29B - C -29B C-29 - C -29B - Plan #7 C -29B approved C-31 - C-31 - C-31 C-31 - C-31 A- C-31 A C-31 - C-31 B- C-31 B C-31 - C-31 PB1 - C-31 PB1 C-32 - C-32 - C-32 C-32 - C -32A - C -32A C-32 - C -32B - C -32B C-32 - C -32C - C -32C Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Depth Depth Distance (usft) from Plan (usft) (usft) (usft) (usft) 13,668.00 11,750.00 852.55 245.44 13,625.00 12,575.00 1,114.59 241.47 11, 058.85 Out of range 11,125.00 Out of range 11, 349.98 Out of range 11, 350.00 Out of range 11, 349.98 Out of range 11, 350.00 Out of range 11, 059.35 Out of range 11,125.00 Out of range 12, 667.26 Out of range 10, 520.00 Out of range 11, 291.29 Out of range 11, 350.01 Pass - Major Risk 11, 325.00 Pass - Major Risk 11, 625.00 Out of range 12, 783.12 Out of range 10, 500.00 Out of range 362.78 15.43 15.43 361.51 701.46 591.35 465.95 678.54 30.29 0.22 0.19 36.66 15.17 4.38 2.51 592.31 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/19/2016 9:53:33AM Page 2 COMPASS 5000.1 Build 81B Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 607.27 Pass - Major Risk 875.95 Pass - Major Risk Out of range Out of range Out of range 332.72 Pass - Major Risk 15.43 Pass - NOERRORS 15.43 Pass - NOERRORS 324.87 Pass - Major Risk 701.03 Pass - Minor 1/10 587.09 Pass - Minor 1/10 465.72 Pass - Minor 1/10 93.14 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/19/2016 9:53:33AM Page 2 COMPASS 5000.1 Build 81B 4040 BP ON a I pTravelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00 usft Reference Well: C-31 Well Error: 0.00 usft Reference Wellbore C -31C Reference Design: C -31C WP04 Summary Site Name Offset Well - Wellbore - Design PB C Pad C-32 - C -32D - C -32D C-32 - C-32DPB1 - C-32DPB1 C-34 - C-34 - C-34 C-34 - C -34A - C -34A C-34 - C -34A - Plan #2 C-39 - C-39 - C-39 C-39 - C -39A - C -39A C-39 - C-39APB1 - C-39APB1 C-39 - C-39PB1 - C-39PB1 C-41 - C-41 - C-41 C-41 - C-41 A - C-41 A C-41 - C-41APB1 - C-41APB1 C-41 - C41 B - C-41 B PB DS 15 15-02 - 15-02A - 15-02A Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 12,783.07 10,125.00 974.61 12,783.07 10,125.00 974.61 12,591.55 12,625.00 1,194.10 12,575.00 12, 525.00 1,291.42 11,436.42 11,725.00 1,135.66 Well C-31 Mean Sea Level C-31A/B OKB @ 70.90usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum No -Go Allowable Distance Deviation Warning (usft) from Plan (usft) 592.84 400.03 Pass - Major Risk 592.88 399.99 Pass - Major Risk Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 413.83 780.26 Pass - Major Risk 415.63 875.83 Pass - Major Risk Out of range 230.19 963.74 Pass - Major Risk Offset Design PB C Pad - C-12 - C -12C - C -12C Offset Site Error 0 00 usft Survey Program: 100-GYD-CT-CMS, 11325-GYD-CT-CMS, 11477 -MWD Rule Assigned: Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference offset Toolface + Offset Wellbore Centre Casing - Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NI -S +EI -W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usff) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 11,983.00 8,956.34 13,050.00 8,970.30 42.07 47.84 169.90 -3,178.03 5,947.49 2.812 1,562.75 266.81 1,300.38 Pass - Major Risk 11,989.92 8,956.34 13,025.00 8,969.38 42.07 47.67 170.76 -3,168.48 5,824.41 2.812 1,549.67 267.76 1,286.83 Pass - Major Risk 12,000.00 8,956.33 12,950.00 8,967.72 42.08 47.21 172.03 -3,152.86 5,751.27 2.812 1,524.38 267.83 1,259.13 Pass - Major Risk 12,000.00 8,956.33 12,975.00 8,967.70 42.08 47.35 172.03 -3,156.20 5,776.04 2.812 1,530.69 266.61 1,266.49 Pass - Major Risk 12,000.00 8,956.33 13,000.00 8,968.32 42.08 47.50 172.01 -3,161.31 5,800.50 2.812 1,539.10 269.40 1,275.93 Pass - Major Risk 12,012.49 8,956.32 12,925.00 8,968.15 42.09 47.08 173.51 -3,151.68 5,726.31 2.812 1,520.37 269.95 1,254.85 Pass - Major Risk 12,025.00 8,956.32 12,850.00 8,972.22 42.10 46.76 174.86 -3,159.50 5,651.98 2.812 1,521.79 270.60 1,253.88 Pass - Major Risk 12,025.00 8,956.32 12,875.00 8,970.38 42.10 46.85 174.93 -3,155.20 5,676.54 2.812 1,519.26 271.28 1,252.39 Pass - Major Risk 12,025.00 8,956.32 12,900.00 8,968.92 42.10 46.96 174.98 -3,152.54 5,701.35 2.812 1,518.81 271.99 1,253.01 Pass - Major Risk 12,036.21 8,956.31 12,825.00 8,973.80 42.11 46.67 176.14 -3,165.07 5,627.66 2.812 1,525.82 272.36 1,257.55 Pass - Major Risk 12,050.00 8,956.30 12,750.00 8,977.22 42.13 46.38 177.67 -3,176.04 5,553.72 2.812 1,534.08 273.26 1,263.66 Pass - Major Risk 12,050.00 8,956.30 12,775.00 8,976.16 42.13 46.48 177.71 -3,174.31 5,578.63 2.812 1,532.94 273.91 1,263.48 Pass - Major Risk 12,050.00 8,956.30 12,800.00 8,974.97 42.13 45.58 177.76 -3,170.63 5,603.32 2.812 1,530.26 274.55 1,261.78 Pass - Major Risk 13,475.00 8,955.80 12,725.00 8,977.80 46.37 46.27 132.63 -3,176.10 5,528.73 2.812 1,523.22 201.54 1,329.85 Pass - Major Risk 13,486.20 8,955.79 12,700.00 8,977.60 46.42 46.16 133.97 -3,174.57 5,503.78 2.812 1,504.30 203.44 1,310.59 Pass - Major Risk 13,489.89 8,955.79 12,675.00 8,976.38 46.44 46.04 134.45 -3,171.33 5,479.03 2.812 1,484.50 203.93 1,290.13 Pass - Major Risk 13,500.00 8,955.79 12,550.00 8,966.57 46.49 45.47 136.01 -3,139.90 5,358.79 2.812 1,378.55 205.06 1,180.48 Pass - Major Risk 13,500.00 8,955.79 12,575.00 8,967.45 46.49 45.58 135.98 -3,148.56 5,382.22 2.812. 1,400.82 205.20 1,203.53 Pass - Major Risk 13,500.00 8,955.79 12,600.00 8,969.08 46.49 45.70 135.92 -3,155.94 5,406.05 2.812 1,422.54 205.37 1,226.07 Pass - Major Risk 13,500.00 8,955.79 12,625.00 8,971.34 46.49 45.81 135.84 -3,162.18 5,430.14 2.812 1,443.74 205.56 1,248.12 Pass - Major Risk 13,500.00 8,955.79 12,650.00 6,973.84 46.49 45.93 135.75 -3,167.07 5,454.53 2.812 1,464.30 205.78 1,269.55 Pass - Major Risk 13,508.68 8,955.79 12,525.00 8,966.15 46.53 45.35 137.06 -3,129.56 5,336.04 2.812 1,355.47 206.76 1,157.22 Pass - Major Risk 13,510.88 8,955.79 12,500.00 8,965.92 46.54 45.24 137.32 -3,117.80 5,313.98 2.812 1,331.91 207.12 1,133.20 Pass - Major Risk 13,518.00 8,955.79 12,425.00 8,967.30 46.57 44.93 138.09 -3,083.66 5,247.34 2.812 1,262.06 208.31 1,061.67 Pass - Major Risk 13,518.00 8,955.79 12,450.00 8,966.91 46.57 45.03 138.12 -3,093.52 5,270.30 2.812 1,284.67 208.44 1,085.26 Pass - Major Risk 13,518.00 8,955.79 12,475.00 8,966.33 46.57 45.13 138.15 -3,105.27 5,292.35 2.812 1,308.16 208.56 1,109.35 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/19/2016 9:53:33AM Page 3 COMPASS 5000.1 Build 81B North America - ALASKA - BP Prudhoe Bay PB C Pad C-31 C-31 C C-31 C WP04 Plus 500ft MD AOGCC Offset Well Report 20 October, 2016 MAA Rps BAKER HUGHES 0woo1 by Date 10/20/2016 Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00usft Reference Well: C-31 Well Error: 0.00usft Reference Wellbore C -31C Reference Design: C -31C WP04 Plus 500ft MD BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well C-31 Mean Sea Level C -31A/13 OKB @ 70.90usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference C -31C WP04 Plus 500ft MD Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 11,039.39 to 14,168.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,613.61 usft Error Surface: Elliptical Conic rias BAKER HUGHES Survey Tool Program Date 10/20/2016 From To Offset Centre to (usft) (usft) Survey (Wellbore) Tool Name Description 50.00 9,944.80 GCT (C-31 PB1) GCT -MS Schlumberger GCT multishot 9,987.00 11,039.39 2 : MWD - Standard (C -31A) MWD MWD - Standard 11,039.39 14,168.00 C -31C WP04 Plus 500ft MD (C-31 C) MWD MWD - Standard Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) PB C Pad C-02 - C-02 - C-02 13,925.00 10,300.00 1,111.39 C-02 - C -02A- C -02A 13,925.00 9,925.00 1,317.29 C-12 - C-12 - C-12 14,138.53 11,025.00 795.91 C-12 - C -12A- C -12A 14,138.53 11,025.00 795.91 C-12 - C-12APB1 - C-12APB1 14,138.53 11,025.00 795.91 C-12 - C -12B - C-126 14,165.54 12,325.00 35.90 C-12 - C -12C - C -12C 14,138.53 11,025.00 795.91 C-12 - C-12CPB1 - C-12CPB1 14,138.53 11,025.00 795.91 C-31 - C-31 - C-31 11,058.85 11,125.00 362.78 C -31 -C -31A -C -31A 11,349.98 11,350.00 15.43 C-31 - C-31 B- C-31 B 11,349.98 11,350.00 15.43 C-31 - C -31C - C -31C WP04 13,668.00 13,668.00 0.00 C-31 - C-31 PB1 - C-31 PB1 11,059.35 11,125.00 361.51 C-32 - C-32 - C-32 12,667.26 10,520.00 701.46 C-32 - C -32A - C -32A 11,291.29 11,350.01 591.35 C-32 - C -32B - C -32B 11,325.00 11,625.00 465.95 C-32 - C -32C - C -32C 12,783.12 10,500.00 678.54 C-32 - C -32D - C -32D 13,817.11 11,800.00 729.30 C-32 - C-32DPB1 - C-32DPB1 13,825.00 11,700.00 841.05 C -41 -C -41A -C -41A 12,591.55 12,625.00 1,194.10 C-41 - C-41AP61 - C-41APB1 12,575.00 12,525.00 1,291.42 PB DS 15 15-02 - 15-02A - 15-02A 11,436.42 11,725.00 1,135.66 1012012016 10:36:47PM Page 2 of 50 COMPASS 5000.1 Build 81B Project: Prudhoe Say Ma9nzm 11 n�eoNom,ae.tsr, Nam WELLBORE DETAILS: U-31 L; KI:tERtNCtlNWKMAIIuN Site: PBC Pad a FieN C -31C Co-ordinate (NIE) Reference: Well C-31, True North Well: C-31� ` srergm.5737.esn Vedical (TVD) Reference: Mean Sea Laiel Obp r Wellbore: C -31C avAreio:etOt Sectien(VS) Reference: Slot -(0.00N,H E) Dam:1v1201 Parent Wellbore: C -31A MeawredD ih Reference: C-31N8OKB 70.90us8 Plan: WP04 Plus 50Dft MD(C-311C-31C) — Mak1:BGGMZIi Tie on MD: 11039.39 Cakulalionfe.n. Minimum Curv�re EEastingp�(90 uspf�Vin) J!P S S S O) T OI S �S�p S SSm S T T m S S S OI �OpI Or tSp rOpI Oi Oi S J Vl OJI 1,J V J NS O S S O O O O O O O O O O O O O S O O O S O O O O O O O O O O 05,31, ------- A C -32/C -32C 5958180 -3"/C-31 C VVP04 errn 5957190 O 5958090 h0 0 5958000 C -12/C -12B 5957910 5957820 9,30,3 C-32/C-32DF w 5957730 C -02/C-02 rn C -32/C -32D m1117640 c t r gg��/C-31C VVP04 Plus 50 MD C-12/C-12CPB.1 Z 5957550 - 5957460 SQ5717n C -12/C-12 -12/C -12C ' ��U 0 �y0 h m C -31/C -31B 5957280 -3"/C-31 C VVP04 errn 5957190 C -12/C -12B 5957100 5957010 5956920 gg��/C-31C VVP04 Plus 50 MD C-12/C-12CPB.1 O C -12/C-12 -12/C -12C 5956830 000 C -29/C-29 ,C '�C-12/C-12A .C -29/C -29A '-C=12/C-12APB1 5956740 0 m � i0 O O O O O N � O O W N S O tv0 O J S NO P W rpj O O O O O O O O O O Easting (90 usft/in) Mean Sea Level C -31/C-31 riPI ECsNES 00 2 0 5957730 5957640 p 5057550 190 100 910 a20 I/C-31A MANUAL VALVE CHOKEHCR Choke L1M CM28/ CM21 ' CM4 CMt7 C wwr CM25 CM20 CM22 CM23 CM27 / T)pef Tank / CM78 CM1B CUTTINGS BOX ' / TIGER TANK 1 NORDIC CTD UNIT # 2 CHOKE / REEL / CIRCULATION MANIFOLD DIAGRAM ChaI o e P ne St ndplm 2"Ci-1.1 i Line aM SM 17 NIL— Driller Gaupe�e CIRCULATING MANIFOLD^ Manual Choke MMB MMB 70 MM 16 O D Calista Mm 1s �� lolsrolz SLB Transducer - MMfi PVT Sensor MM? Baker Choke MM 13 MM d MM 17 KILL SIDE MANUAL VALVE Rev Cir Line KILL HCR fAlrBlowdown MM 12 MMid f MM Coiled Tubing Be rChoke Kill Line ¢ M P 2 Met *�. — — — — — — — — — — — J Kill Line I \ BOP 18 Nell HP 10 Traneucers COILED TUBING f \ gpp 17 CIRCULATING SYSTEM r HP 18 XP 76 P19 HP9 HP9.. To Inner Reel 0 Valve r HPMP HP7 HPS HPd :-. HP3 i 73 L i HP 12 r HP HP1 T IP7S cement line LB CHOKE MANIFOLD IP 17 N2 Tri FloA/ CM 85 Gaup¢ MGS GAS BUSTER Test Pump Inlet j CM O X upe PBt Flow it HC dWav BloCMI/ CMS CM26 Note CMS CMB C%-11 PBZ liquid eg' is Baker Choke Line 10 from —1PBJ y high CM13 CM7 CM75 CM2 MANUAL VALVE CHOKEHCR Choke L1M CM28/ CM21 ' CM4 CMt7 C wwr CM25 CM20 CM22 CM23 CM27 / T)pef Tank / CM78 CM1B CUTTINGS BOX ' / TIGER TANK 1 TRANSMITTAL LETTER CHECKLIST WELL NAME:�� PTD: Development Service _ Exploratory Stratigraphic Test Non -Conventional FIELD: �c t POOL: C l Check Box for Appropriate Letter / Paragraphs to he Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL (If last two digits No. , API No. 50- - - - Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where sam les are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015