Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
206-092
Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:206-092 6.50-029-23314-00-00 PRUDHOE BAY, SCHRADER BLUFF OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 11965 11965 4722 5812 4297 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" X 34" 32 - 112 32 - 112 2280 770 Surface 3426 10-3/4" 31 - 3457 31 - 2778 3580 2090 Intermediate 6641 7-5/8" 29 - 6670 29 - 4632 6890 4790 Production Perforation Depth: Measured depth: 6498 - 11923 feet True vertical depth: 4603 - 4719 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr80 26 - 5887 27 - 4343 5812 4297Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker Premier Packer Liner 4945 4-1/2" 7018 - 11963 4641 - 4722 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 2781260160453 6720 2282 243 159 326 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Brodie Wages david.wages@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:(907)564-5006 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured4722 Sundry Number or N/A if C.O. Exempt: 260-092 Junk Packer Printed and Electronic Fracture Stimulation Data 5 Install Jet Pump Operations shutdown Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 028238 & 028239 PBU L-204 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 10:36 am, Aug 25, 2020 Digitally signed by Stan Golis DN: cn=Stan Golis, ou=Users Date: 2020.08.25 10:21:51 - 08'00' Stan Golis 320-046 HEW RBDMS HEW 8/25/2020 DSR-8/27/2020 SFD 8/31/2020MGR04SEP2020 ACTIVITY DATE SUMMARY 7/3/2020 ***WELL S/I ON ARRIVAL*** (Jet Pump) UNABLE TO GET 4-1/2" X-CATCHER THROUGH TBG HANGAR. (appears to be hydrates, pumped ~10 bbls meth) DRIFTED TO 100' SLM w/ 3.80" CENT, 1.50" S-BLR. ***WSR CONTINUED ON 7/4/20*** 7/4/2020 ***WSR CONTINUED FROM 7/3/20*** (Jet Pump) SET 4-1/2" X-CATCHER IN X-NIP @ 5,769' MD. ATTEMPTED TO PULL ST# 1 @ 5,648' MD. ***END TICKET, JOB INCOMPLETE*** 7/5/2020 **WELL S/I ON ARRIVAL, NOTIFY PAD OP & FILL OUT PERMIT** PULL 1" BK-SOGLV (btm of vlv flow cut) FROM STA #1 @ 5632' SLM / 5648' MD, EMPTY POCKET PULL 1" BK-LGLV (16/20 port, 1807# TRO) & SET 1" BK-DGLV IN STA #3 @ 4575' SLM / 4590' MD PULL 1" BK-LGLV (16/20 port, 1811# TRO) & SET 1" BK-DGLV IN STA #4 @ 2995' SLM / 3011' MD LRS PUMP 180BBLs OF CRUDE DOWN IA TO DISPLACE SET 1" BK-DGLV IN STA #1 @ 5632' SLM / 5648' MD, LRS PUMP 50BBLs OF CRUDE DOWN IA TO TRY & PRESSURE UP, UNABLE TO CATCH PRESSURE, IA ON A VAC ***CONTINUE JOB ON 07-06-20*** 7/5/2020 T/I/O=800/800/260 Temp= S/I LRS Unit 76 Assist Slickline: Loaded IA with 5 bbls 50/50 and 180 bbls crude. Slickline set valves, pumped 50 bbls crude down IA and never caught pressure. Job postponed until next day. Well head normaled up, IA OA= OTG. Final Whp's=760/vac/360 7/6/2020 ***CONTINUE JOB FROM 07-05-20, WELL S/I ON ARRIVAL, NOTIFY PAD OP & FILL OUT PERMIT*** PULL 4-1/2" X-LOCK CATCHER FROM XD SSD @ 5750' SLM / 5769' MD, EMPTY *LRS PUMP 110BBLs OF CRUDE DOWN TBG TO DISPLACE* SET 4-1/2" PX PLUG BODY (OAL=26" & 4 x 7/16" EQ PORTS, STD PKG) IN X- NIPPLE @ 5821' SLM / 5839' MD SET P-PRONG (F/N=1.75", OAL=96", 12 x 1/4" PORTS) @ 5813' SLM, LRS PUMP 53BBLs DOWN TBG @ 5bpm, UNABLE TO CATCH PRESSURE PULL P-PRONG (F/N=1.75", OAL=96", 12 x 1/4" PORTS) @ 5813' SLM PULL 4-1/2" PX PLUG BODY (OAL=26", 4 x 7/16" EQ PORTS, STD PKG) FROM 5821' SLM / 5839' MD & SET IN X-NIPPLE @ 5842' SLM / 5860' MD SET P-PRONG (F/N=1.75", OAL=96", 12 x 1/4" PORTS) @ 5834' SLM, LRS PUMP 50BBLs DOWN TBG @ 5bpm, UNABLE TO CATCH PRESSURE *4-1/2" PX PLUG BODY (OAL=26" & 4 x 7/16" EQ PORTS, STD PKG) & P-PRONG (F/N=1.75", OAL=96", 12 x 1/4" PORTS) LEFT IN WELL* ***CONTINUE JOB ON 07-07-20, PAD OP NOTIFIED*** 7/6/2020 T/I/O= 800/0/280 Temp= S/I LRS Unit 76- Assist Slickline (Jet Pump) Slickline set valves on previous day, pumped 50 bbls crude on previous day and never caught pressure, pumped 8.3 bbls down IA and pressured up to 1000 psi to check valves set. Bled pressure to 0 ps. Loaded TBG with 110 bbls 70* crude. Slickline set plug. Pumped 113 bbls crude down TBG in attempt to test plug. Never caught pressure. Slickline reset plug. Pumped 50 bbls crude down TBG and never caught pressure. Job postponed until next day. Normaled up tree valves. IA OA = OTG. Final Whp's= vac/250/294 Daily Report of Well Operations PBU L-204 Daily Report of Well Operations PBU L-204 7/7/2020 ***CONT FROM 07/06/20 WSR, WELL S/I ON ARRIVAL, FILLED OUT PERMIT W/ PAD OP*** PULLED P-PRONG & 4-1/2" PX-PLUG BODY @ 5860' MD¿ONLY SLIGHT OVERPULL TO GET BOTH OUT, PKG LOOKED GOOD ON BOTH SET 4-1/2" PX-PLUG BODY (oal=26", 4 x 7/16" eq. ports, standard pkg, oversized center o-ring) IN XD DURO SSD @ 5769' MD...LOST 1 NUBBIN SET P-PRONG (oal=96", 1.75" F.N., 1.80" BODY) IN PX-PLUG BODY @ 5769' MD ***CONT. ON 07/08/20 WSR*** 7/8/2020 T/I/O=140/53/273 Temp= S/I LRS Unit 76- Assist SLickline: MIT-IA PASSED to 3095 psi. Max applied=3300 psi. Target pressure= 3000 psi. Pressured up TBG to 1500 psi with 38 bbls crude. Pressured up IA to 3295 psi with 2.4 bbls crude. 1st 15 min IA lost154 psi. 2nd 15 min IA lost 46 psi for a total loss of 200 psi in 30 min. Bled IAP to 10 psi and recovered 2.4 bbls. Slickline opened sliding sleeve, pumped 17 bbls crude down IA for flush. Slickline set Jet Pump. Pumped 50 bbls crude down IA up TBG to formation. Job complete. Slickline in control of well upon departure. Tags hung. IA OA= OTG. Final Whp's=100/vac/285 7/8/2020 ***CONT. FROM 07/07/20 WSR, WELL S/I ON ARRIVALFILLED OUR PERMIT W/ PAD OP*** LRS PRESSURED UP TO 1500 PSI ON PX-PLUG @ 5769' MD, PLUG HOLDING PRESSURE ALLOWING FOR MIT-IA LRS PERFORM PASSING MIT-IA TO 3000 PSI (154 / 46) PULLED P-PRONG & PX-PLUG BODY @ 5769' MD SHIFTED XD DURO SSD OPEN @ 5769' MD...IA WENT ON -14 PSI VAC AFTER SHIFTING SET 4-1/2" JET PUMP INSERT (sn# 201231B, ratio E+10, oversized o-ring on each packing stack,LIH=56") IN XD DURO SSD @ 5769' MD...LOST ONE 3/8" STEEL NUBBIN LRS PUMPED 50 BBLS CRUDE @ 2 BPM DOWN IA, CONFIRMED FLOW PATH & JET PUMP IS WORKING PROPERLY DRIFTED W/ 20' x 3.70" DUMMY WHIPSTOCK DRIFT TO 3000' SLM FOR SUBSIDENCE SURVEILLANCE...NO ISSUES FOUND RAN KJ & 23" STAR MAGNET, LIGHTLY RATTLE ALL MANDRELS & LIGHTLY SD ON JET PUMP @ 5749' SLM (5769' MD). POOH @ 150 FPM & SLOW DOWN THRU ALL JEWELRY...RECOVERED LOST 3/8" STEEL NUBBIN & ~1 CUP OF METAL SHAVINGS ***JOB COMPLETE, CLOSED PERMIT W/ PAD OP*** 7/19/2020 T/I/O = SSV/0/0 Temp - SI. LRS Unit 42 assist DSO with IA. Pumped 10 bbls Neat Meoh into IA. DSO notified upon job completion. SSV/WV/SV (closed), IA/OA (OTG). FWHP's = SSV/45/0 7/26/2020 T/I/O= 0/0/125. LRS Unit 72. Freeze Protectthe TBG and IA. Pumped 66 bbls of crude into the IA. Pumped 38 bbls of crude into the TBG. Final T/I/O= 15/0/125. 8/3/2020 T/I/O= 40/0/150. LRS Unit 72 Assist Slickline (JET PUMP) Freeze protect the TBG with 5 bbls of 50/50 Meoh and 38 bble of heated crude. Pumped another 30 bbls of crude to assist running new pump. Pumped 66 bbls of crude into the IA for freeze protection. Final T/I/O= 0/2/140. Daily Report of Well Operations PBU L-204 8/3/2020 ***WELL FLOWING ON ARRIVAL*** (Jet Pump) PULLED 4-1/2" JET PUMP FROM X-NIP @ 5,769' MD. (no visible issues) DRIFTED TO KNOWN OBSUTRCTION @ 6,047' SLM w/ 3.50" CENT, 2-1/2" S- BLR. (empty blr) ATTEMPTING TO SET 4-1/2" JET PUMP, DROPPED FROM X-NIP @ 2,192' MD. RETRIEVED 4-1/2" JET PUMP FROM ST# 1 @ 5,648' MD. ***WSR CONTINUED ON 8/4/20*** 8/4/2020 ***WSR CONTINUED FROM 8/3/20*** (Jet Pump) SET 4-1/2" JET PUMP (S/N: HC-00017, Nozzle: 11, Throat: B) IN X-NIP @ 5,769' MD. (XD Duro SSD) RAN 4-1/2" CHECK SET TO JET PUMP @ 5,769' MD. (sheared) LRS PUMPED 107 bbls CRUDE DOWN IA TO CONFIRM JET PUMP FUNCTIONS. ***JOB COMPLETE, WELL LEFT S/I*** 8/4/2020 LRS Well Test Unit #6 , Begin WSR 8/4/20 , Slow Bean Up / Well Test , Inlet Well L- 204 , Outlet Well L-106 , Job Start Rig Up , Continue on WSR 8/5/20 8/4/2020 T/I/O= 40/60/120. LRS Unit 72 Assist Slickline (JET PUMP). Pumped 107 bbls of 100* F crude into the IA to test new jet pump. Caught fluid after pumping 93 bbls at 1.5 bpm. IAP went from 0 psi to 166 psi. Pumped another 14 bbls at 1 bpm to increase the TP from 60 psi to 385 psi while IAP stabilized at 719 psi. Final T/I/O= 350/10/140. Freeze protect the F/L with 7 bbls of 50/50 Meoh. Tags hung and Operator notifed upon departure. 8/5/2020 LRS Well Test Unit #6 , Continue from WSR 8/4/20 , Slow Bean Up / Well Test , Inlet Well L-204 , Outlet Well L-106 , Rig Up / Pressure Test / POP , Continue on WSR 8/6/20 8/6/2020 LRS Well Test Unit #6. Slow Bean Up / Well Test. Inlet Well L-204 , Outlet Well L- 106. Continue from WSR 8/5/20. Continue to Flow / Stabilize. Job in Progress. Continue on WSR 8/7/20. 8/7/2020 LRS Well Test Unit #6. Slow Bean Up / Well Test. Inlet Well L-204 , Outlet Well L- 106. Continue from WSR 8/6/20. Continue to Flow / Stabilize. Job in Progress. Continue on WSR 8/8/20. 8/8/2020 LRS Well Test Unit #6. Slow Bean Up / Well Test. Inlet Well L-204 , Outlet Well L- 106. Continue from WSR 8/7/20. Continue to Flow / Stabilize. Job in Progress. Continue on WSR 8/9/20. 8/9/2020 LRS Well Test Unit #6. Slow Bean Up / Well Test. Inlet Well L-204 , Outlet Well L- 106. Continue from WSR 8/8/20. Continue to Flow / Stabilize. Divert into WPS. 12Hr Piggyback Well Test. Job in Progress. Continue on WSR 8/10/20. 8/10/2020 LRS Well Test Unit #6. Slow Bean Up / Well Test. Inlet Well L-204 , Outlet Well L- 106. Continue from WSR 8/9/20. Continue to Flow. SI for Pigging. RePOP. Job in Progress. Continue on WSR 8/11/20. 8/11/2020 LRS Well Test Unit #6. Slow Bean Up / Well Test. Inlet Well L-204 , Outlet Well L- 106. Continue from WSR 8/10/20. Continue to Flow & Stabilize. Job in Progress. Continue on WSR 8/12/20. 8/12/2020 LRS Well Test Unit #6. Slow Bean Up / Well Test. Inlet Well L-204 , Outlet Well L- 106. Continue from WSR 8/11/20. Continue to Flow & Stabilize. BD, RD. Job Complete. End WSR 8/12/20. THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Cale Peru Petroleum Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission Re: Prudhoe Bay Field, Orion Schrader Bluff Oil Pool, PBU L-204 Permit to Drill Number: 206-092 Sundry Number: 320-046 Dear Mr. Peru: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www, a o g c c. a l a s ka. g o v Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, ice e . P Chair DATED this -15 day of February, 2020. RBDMS � FEB 0 4 2020 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 JAN 2 4 2020 Drs zl a / -) , 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other Install Jet Pump 21 ' 2. Operator Name: BP Exploration (Alaska), Inc 4, Current Well Class: Exploratory ❑ Development m • 5. Permit to Drill Number: 206-092 3. Address: P.O. Box 196612 Anchorage, AK 99519-0612 Straligraphic ❑ Service ❑ 6 API Number: 50-029-23314-00-00 7. If perforating: 8. Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No 0 PBU L-204 - 9. Property Designation (Lease Number): 10. Field/Pools: ADL 028239'& 028238 PRUDHOE BAY. ORION SCHRADER BLUFF OIL 11, PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 11965 ' 4722 11965 4722 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 29'X 34" 32-112 32-112 Surface 3426 10-3/4" 31 -3457 31 -2778 3560 2090 Intermediate 1 6642 7-5/8" 29-6670 1 29-4632 1 6890 4790 Production Liner 1 4945 4-1/2" 7018-11963 4641-4722 1 8430 1 7500 Perforation Depth MD (fl): Perforation Depth TVD (ft): 1 Tubing Size: Tubing Grade: Tubing MD (ft): 1 7451 - 11923 4603-4719 4-1/712.61f 13Cr80 26-5887 Packers and SSSV Type: 4-1/2" Baker Premier Packer Padrers and SSSV MD (ft) and TVD (fl): 5812 / 4296 No SSSV Installed No SSSV Installed 12. Attachments: Proposal Summary ® Wellbore Schematic m 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development ® ' Service ❑ 14. Estimated Date for Commencing Operations: Februsry 7, 2020 - 15. Well Status after proposed work. Oil ® WNJ ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Peru, Cale be deviated from without prior written approval. Contact Email: Cale.Peru@bp.com Authorized Name: Peru, Cale Contact Phone' +1 9075644522 Authorized Title: Petroleum Engineer Authorized Signature: Date: / a-1116�0 07P COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: O Plug Integrity 11BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance EI♦ Other: RBDMS -Y FEB p d 2020 Post Initial Injection MIT Req'd? Yes ❑ No Spacing Exce tion Required? Yes ❑ No Subsequent Form Required: APPROVED BYTHE Approved by: COMMISSIONER COMMISSION Date: 3 WE q'b Zo Form 10-403 Revised D4/2017 ORIGINAL Approved application is valid for 12 months from the date of approval. 9,7*�D /YJ 6♦ej/�d Submit Form and Attachments in Duplicate 30-403 Sundry Application for Well PBU L-204 PTD #206-092 Expected Start Date: February 7, 2020 Current condition of well: Gas Lift Producer, Operable, Online: Oil Rate: 403 BOPD Gas Rate: 351 Mscf/Da Water Rate: 108 BWPD Tubing Pressure: 317 psi -Flowing Shut-in Wellhead Pressure: —1000 psi Reservoir Pressure: 1144 psi Program History and Objective(s): L-204 is a low total fluid penta-lat Schrader well that frequently has hydrate issues, which decreases it's on-time. The objective is to convert this well from bas lift into a jet pumped well to increase its on-time by warming it up. Proposed Program: 1) Set catcher. Pull #1,3,4. Dmy #3, 4. Load IA. Dmy #1. MIT -IA to 3000 psi (max power fluid supply pressure = 2300 psi). 73m," ,, , - c-Lc_�4�w a. Optionally, could open the sliding sleeve and use it as a flow path while loading rather than station 1, then close it. 2) Brush sliding sleeve at WSL discretion. Open sliding sleeve. Pump —10 bbl of crude down IA to confirm sleeve is open. 3) Set jet pump insert with check valve (E+10) at 5769'. Pump 50 bbl's of crude down IA at 2 bpm to confirm we have a flow path. 50 bbl should be plenty to catch pressure and know we are going through the jet pump. BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 10-403 Sundry Application for Well PBU L-204 PTD #206-092 Current Wellbore Schematic: L-204 SAFETY NOTES: WELL ANGLE >70.06380' (1-1, L2, L3 & 1-4) •^4-In"CHROME TBG-- ELEV - 50. Z 20'COGd1CTOR )-- ��' .Angle 100' 43 7234• --. Tum GO- 8147 tum TVD' 4400 SS 10-W4•CSG,455 , W550TC,D=995- 1 3467- 4673' GAIXJk U 394"- I Minimum ID = 3.688" @ 5925' BAKER LEM _ 14.12' LBC, 12 6a, 13CR40 VAM TOP, ',.0152 bpl, D - 3 958- 7-518' RA T AO - 8016' P3Ag3LOWERSDILASSY, D=3890' H HASSY 6036- = 036' BOI�DRA M ' 3 GSr 21 4-v1'sx 1'D=3613 CAS L!7- MAIDf1ELS ST LID I TVDl DEVI TYPE I VLV ILATCHI FORTI DATE 4 3011 2491 50 KBG2 170ME BK 16 0121112 3 4590 3508 51 K:2 DOGE BK i 16 0121112 2 5538 4116 49 K9Cs2 O!1 BK 0 09101N6 1 5648 4189 49 KBG2 SO BK 16 10113117, FfS 5817 1 17 5/8' x 4 117 BKR PW FXR D = 3870' 6839' H41;2'FES x filli,D-3613• j 5860' 41171$XNP, D=3.813' _6887- 4-1@'MUIP SHOE w/525•ND GO, D=3.959' 6897- }-5-vr X41'2'X0 D-as°.8 L410A)LBA"LvD '..5^- L4 (6) 5930.5911' OPSINS WDTH=333- 6001' 7-5/8'X5 t2'BKR Z%P L7WI®K, D=4.950' 8023' 10112SEAL BORE D(T83OR D = 475' 0047 L3 (Oea) LEM ATDOW 59° I.3 � (Oea) � 6M'- 6076 vJ 2i DD ItLO.a.N MTTJ - i ti' 6109' —FM/ X512'9KHZXPLTM*5K.D=4.975 7518'RA TAG -- 6116' - 6120' 101/7- SFA_6OIRE E%IE3SKky D=4.75 LBA92LGA41RSLALAS51'. U- 389V I 6141 - _ -- _-- ---- 6147'-l-12•X412'XO. V-3951; BAKER FODK FNNGER ASSY- 6165' �1 L2(OBb) LEM WNDOW 63° w/LI SFALNG LeA, D=3688' -- - -- L'(M)I-----,- 1 8169'-616'. J 0PD4,1GWDTR.333- LOAVLOAEt SFALASSY,D=308' 6265' 8229 7-578'X5-12'PXR7XPl7RTERK,D=5590' 7-518'f1A TAG - 6381' 626G 19'SEAL BORE IX M..D=475'.. 7 518' CSG, 29 7p, L-80 BTCN D = 6.875' H—W70" ) 6278' 5-12' X 4_12' XO D _3 95� PEWOfRATON SDMIARY ;70177 FIF LOG:AFOLEATTOPiES. '�' 6'AfOFLOWT/RUALUGfAMBLLPLNR Mte- fifer to Raduc bon CB for ti Wrcal Part dale (BBINO SLOTTED LIN90 SQE SR' MENAL OPNS4Z I LAT[ l SEE PAGE 2 FOR FE8-OWAT afORMATDN --I----__-.l_ - _ 1_—.____-... L1 r4 12• SOLO LNR 12.8X, L 60, 11985 O ) .0152 bpL D= 3.958' 641E JREVBY I OOMAFWT5 I DATE I REV BY I COMI&Nrs OF" WT VALL L-204 PEBAT M: 2060920 (30l (40) (50) (60) AR M. 50029.23314-00(60)(61)(62)(63) Sri; 34, T12K Fill IF- 24ZX FSL b 1735' FAL 00100 N9® ORIGINAL COMPLETION 1111206 KSBIPJC GLV C!O 0;18108 TYVPJC 1 CPAFT COfvm7ONS GVAM KS86V jGLVCV (1;12(16) - OV29112 BSE PJCCLV (70 (01121712) --�-- BP f4ploratk111 (Alaska) l(WlQ17 GJBF A4)GLV GO (1011717) BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 10-403 Sundry Application for Well PBU L-204 PTD #206-092 L-204 (1-1, L2, L3 & 1-4) uses 4-12' SlM1T3l R(R Q 59]4', 64ST. B4ry' 8 89J5'. - I 14- V2• LW L-80 ST -87-6L0152 bpf, D = 3.958' P9F0R4TDN 9Ll.9MRl .. FU LO'' o6a POm 11911' AW-,LEAT TOPFBS Nate. %ler to RcximWn DB for "lomal peri dale _ _ _ _ _ _ SIM SPF- ZOPE INfFRVAL OWSgx DkTE 4-1r7SV.HL Q!5114,B1E9E 9894'.D=?a- _st-m . -- airi• slip' oA e6ase-96144 0 ea3oro6 _ _ _ _ _ _ 4-1r SLIM ' 08969-11838 O 011(3 a 4112' SLTDOBa 053-0909 O=20/06 6076'-11925'6-374'L3 ( 4-vT LW LBT-M, 01520pi,DO=3 958- 411 R In 10128-1186.9 O 08121'496 - 4-12' SLm' OBb 06282-11848 O OBr14A0 411,' SLID OBC 07451-11923 O O&OZO 6 OBb PHm 11889' 4177 SLID OB] 06688-07103 O 08107/06 4-17 Sim ' 07233-09411 O 08107106 ------"'"" 4 W' SLm ' 09475 11923 O 081071061 4YI9/W1LRR@, D=39'- - - - 6182'- 11910' 6-314. L2 (OBb) 0.117 LW L-80 BT -M .0152 bpf, D= 3.950 I I oe� wrn —{ 11863' I 1 nn _� - 117 SRaL14(R an 7p .D=3.9' ________- I �L�""" 4-t?SN1iL fKR D=390'1. 7123' py 7018'-11965'6-3/4'(08c) 4 VY SWILL Wit D= 399' - 9{3Y 1� -4 MT LW L -6067-M, .0152 bpf, D = 3.956' 4W- WALL WR D -39P 9860' Ll 6229' - 11965 6314' L 1 (OBd) OBd PBm 11963' 1 4-117 LW L 80 BT M.0152 bpr,D=3.956' OWN UNIT WHI L204 P9W No. 2060920 (30) (40) (50) (60) AS M. W029-233 WOO (60) (61) (62) (63) BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 BP erploralbn (Alaska) 10-403 Sundry Application for Well PBU L-204 PTD #206-092 Proposed Wellbore Schematic: ALLHEAD it FMC L-Lv- crllATOR _-LBO (L1, L2, L3 & L4) ITYFE F. ELEV = 50.1' U OP= 700' 20'COFOIX.-FOfi 100' hz An9b - 100• Q 721/' M MMD= 6142' T p� F� ?4/ WiMe'k Ikk%I/e MumTVD 4400'SS BTC, D=9.05• 348T TOi XO To BTGM 4673' 17, r�10.3//• CSG,15.51. K-55 OOFE 7 Sr CSG, 29.76, L40 D = 3.918' Minimum ID = 3.688" @ 6926' BAKER LEM ,AKI1r I" Wtr1 TWlit>/U'(mOSIfU- ••• 4-1/2- CHROME TBL7" GASLFTMANDFIRS 14 AD 1 7vol CEV ITYFE VLV U POf1F DATE 4 3011 2401 50 f07C 2 OOFE BK 16 0121/12 3 4590 3500 51 KBCr2 DOA£ BK 16 0121/12 2 5536 4776 49 KBG2 CAFY &C 0 09101/05 1 5616 4189 49 I®G-2 SO SK 16 10113/17 3.87- WEER HOOK HANGER ASSY / L2 SEALING LeA D = 16W ILISEAL14GLEA0=168B• LZ (Mb) _ _ _ _ _ _ '- _ 6169' 618•. I rwuco ¢eI eecv n=am• I A9f1S• _ BY20' -7-518•% 5-1TY 8KR2xPLTPrnmK, D=5.520• 17-SA1• RA T AG H 6301' I \----AL—M/--- L4;OAILBa V^DON5� FOG. U.N. 11CR80 VAM TOP, 588T iEPFORATDN SW4IARY 5930 594 ,. 3.958- 1 • - �- - � ol�taG MOTH = 3 33 %KERIDOKKANGERASSYA FU LOG 7-5/8'%5-12'6KR2XPLTYR[DK D•a.%0'L3 SEALMG LBA D - J 6B8•79-12 AFDLE AT TOP PEW. We, Para to Reduction OB for h'atarical ped data SEAL DOW 19MMK)N,6042' SIZE I SPF I NI6TVAL OPNSpz DATE 5-112•XCW-%O.D=3.958•OV*RSFALASSY,D=3.890• - - - - ® I L3 (O6. I LEA Wd00W 51 I SEE PAGE 2 FOR HKVORATK)N FFOMNTM WEER HOOK HANGER ASSY / L2 SEALING LeA D = 16W ILISEAL14GLEA0=168B• LZ (Mb) _ _ _ _ _ _ '- _ 6169' 618•. I rwuco ¢eI eecv n=am• I A9f1S• _ BY20' -7-518•% 5-1TY 8KR2xPLTPrnmK, D=5.520• 17-SA1• RA T AG H 6301' 7 SW CSG, 29.F#. L-80 BTC- µ D=6.875' 66%0' _ I I I 1 Q iEPFORATDN SW4IARY I � FU LOG d AFDLE AT TOP PEW. We, Para to Reduction OB for h'atarical ped data SIZE I SPF I NI6TVAL OPNSpz DATE I SEE PAGE 2 FOR HKVORATK)N FFOMNTM L1 4.12' SOLD LNt 12.8#. L-80. .0152 Opf. D = 3.956' 1 t DATE FFV BY COMMENTS DATE REV BY OOM NFS 09WIN NUB ORIgtML COMPLEr10N 1 VIVA KSBIPJC GLV C1O 031IMS TWRIC IXSO CRAFT OORFWTKM WaM KSBISV GLV GO (11112106) 0129112 BSE/ PJC GLV GO (0121112) I IOIINIT I GJ8IJAV IGLV CA IlVlY111 D=C75' L w4 jOEk* OFWNLINT WELL'. L-204 FOW M: 2060920 (30) (40)(50)160) AR W. 5029-2331L00 (60) (61) (62) (63) BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 SP etc6oration (Alaakai 10-403 Sundry Application for Well PBU L-204 PTD #206-092 12174 (1-1, 1-2, L3 & 1-4) — - FFW0PATIDN SL&WRY REF LOG: AN13LEATTOP{B�' Nola. Rlfar to Rodwbon DB fw h'sWrsal pwf data SP.E SPF ZONE WGWAL Opnl9gz DATE 4-12' SLTD OA 06498-08444 O 0873006 412' SLTD 08969-11836 O 063(1006 4-12' SLID 000 06536.09709 O 0020006 4-4Y SL IO ' 10128-11869 0 OBf21W6 4.11T %Tb 091 06282 - 11848 O 0&14106 4.1/C SLID OBo 07451- 11923 O 08102.'06 4-12• SLTD 007 06688.07103 O 08107006 4-12' SI TD - 07233-09411 O 0&07108 4-12' SLID 09175 11923 O 08+0746 M _ - m_ 4-12' S L MP Q5974'. "Sr. U"' a 805-.0-3,9' OBa peTO 11911• d-12' SW3L PICFt fg s t t4, 8488' 69891'. D+ 1.9' 6076'-11925. 6-314'L3 (Oft)4- V2' LW L-80 BT -M, .0152 bpf, D = 3.958' -R)TD 1188!' --- -------- - 4.Y2'&JULRR@EZE, D=39 -------•--- 4/2'LMZ t -BO BT-M..o1526pf, D=3958' rommm I - - - - - - - --- 4-ilT sY43L PKR 97055\oD i.8' 4-177SWflLMFLD+3.90' 4 Tnr—„� 2 9-0'SVALLPMD=3.90' 9432' 9 4-72'LtiZ L-e06T-M, .01526pf, D=3.956- 1 4-12' SN1il ROZ D= 790' 966D' Lt 6229'- 119656314'L7(O8d) OBd PBM 4-12- LM. L-80 BT -M, .0152 bpf, D= 3.958' OWN LNT WELL. L-204 REMP No. 206D920 (30) (40)150) (60) AR W: 50 -029623314 -DD 160) (61) (62) (63) SEC 34, T12K R11E 2423* FSL 81735' FV M. BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 SP a ploreWn (Alaska) Mlt i RfV BV cohNANTS MIE F&V BY COWENTS 09103M PS JORIUMLCUMPLE"UN 11/12/06 MOM GLV dO 0&18008 TWPJC I DM -G DRAFT CORRE IUM I rLV 00 (1 1112M6) V (0) GLV ) - --- MSM 012&12 K- SV BSE/ P,K; GJBIJM) 16/1 17 OWN LNT WELL. L-204 REMP No. 206D920 (30) (40)150) (60) AR W: 50 -029623314 -DD 160) (61) (62) (63) SEC 34, T12K R11E 2423* FSL 81735' FV M. BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 SP a ploreWn (Alaska) • ~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 August 14, 2009 ~~~~,~ ~~~~ ~,`,' ~ ~ ~ , ~~~ Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB L-Pad Dear Mr. Maunder, bp , .~~~~~~~ 0 C T 0~ 2009 ~las~C~ ~ii ~ Gas Cons. Cammis~ion Anchorape ~a~-- pc~~- ~, = aLD 4~ Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB L- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator ~ • BP Expbretion (Alaska ) Inc. Surtace Casing by Conductor Mnulus Cement, Corrosion inhibitor, Seatant Top-off RepoR of Sundry Operetions (10-404) Date L pad 8/13/2009 Well Name PTD # API # Initial to of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibdor/ sealant date ft bbis ft na al L-01 2010720 50029230110000 NA 6 NA 612 6/25/2009 L-02A 2041490 50029230480100 NA 1.4 NA 14.5 6/27/2009 L-03 2051030 50029232690000 NA 2.8 NA 24.7 6/25/2009 L-04 2061200 50029233190000 NA 1.7 NA 15.3 6/25/20~9 L-100 1980550 50029228580100 NA 6.2 NA 57.8 6/29/2009 L-101 1980320 50029228650000 NA 3.3 NA 30.6 6/29/2009 L-102 2020360 50029230770000 37' NA Need To Job? NA L-103 2021390 50029231010000 NA 1.6 NA 102 6/26/2009 L-104 2012380 50029230600000 NA 3.5 NA 47.6 5/6/2009 L-105 2020580 50029230750000 NA 1.75 NA 24.65 5/6/2009 L-106 2012230 50029230550000 NA 2.75 NA 28.05 5/6/2009 L-107 2011510 50029230360000 NA 4.8 NA 57.8 5/6/2009 L-108 2021090 50029230900000 NA 1.2 NA 13.8 6/25/2009 L-109 2012010 50029230460000 NA 2.9 NA 32.3 6/27/2009 L-110 2011230 50029230280000 NA 27 NA 316.2 6/29/2009 L-111 2020300 50029230690000 NA 4.7 NA 54.4 6/29/2009 L-112 2022290 50029231290000 NA 5.5 NA 51 6/27/2009 L-114A 2051120 50029230320100 NA 2.5 NA 25.5 6/29/2009 L-115 2011400 50029230350000 NA 0.5 NA 3.4 6/27/2009 L-116 2011160 50029230250000 NA 5 NA 54.4 6/28/2009 L-117 2011670 50029230390100 NA 2.9 NA 28.9 6/27/2009 L-118 2011870 50029230430000 NA 1.4 NA 15.3 6/27/2009 L-119 2020640 50029230770000 NA 225 NA 28.9 5/6/2009 L-120 2020060 50029230640000 NA 0.75 NA 6.8 5/5/2009 L-121A 2030390 50029231380100 NA 22 NA 25.5 6/27/2009 L-122 2030510 50029231470000 NA 2 NA 20.4 6/27/2009 L-123 2051940 50029232900000 NA 2 NA 18.7 6/27/2009 L-124 2050430 50029232550000 NA 1.8 NA 17 6/27/2009 L-200 2040010 50029231910000 NA 1.8 NA 13.5 6/26/2009 L-201 2040460 50029232020000 NA 1.75 NA 15.3 5/6/2009 L-202 2041960 50029232290000 NA 2 NA 17 6/26/2009 L-204 2060920 50029233140000 NA 1.5 NA 5.95 5/6l2009 L-205 2080530 50029233880000 NA 1 NA 12.75 1/10/2009 L-210 2031990 50029231870000 NA 3.25 NA 31.4 5/5/2009 L-211 2040290 50029231970000 NA 1.8 NA 17 6/27/2009 L-212 2050300 50029232520000 NA 1.8 NA 17 6/26/2009 L-213 2060530 50029233080000 NA 2 NA 17 6/25/2009 L-214A 2060270 50029232580100 NA 025 NA 10.2 5/6/2009 1-215 2051270 50029232740000 NA 1.5 NA 3D.6 5/6/2009 1-216 2040650 50029232060000 NA 1.3 NA 11.9 6/26/2009 L-217 2060750 50029233120000 late blockin conductor NA NA L-218 2051190 50029232720000 NA 1.7 NA 15.3 6/27/2009 L-219 2071480 50029233760000 surface NA NA L-220 2080470 50029233870000 NA 2 NA 20.4 6/28/2009 L421 2080310 50029233850000 NA 1.7 NA 16.2 6/25M2009 L-250 2051520 50029232810000 NA 3.4 NA 34 6/26/2009 L-50 2051360 50029232770000 NA 1.8 NA 20.4 6/27/2009 L-51 2060590 50029233090000 NA 1.8 NA 17 6/27/2009 09/23/08 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth wpu InN ~ N0.4903 ox a:y''~:t f~~~~a~~ ~ ~ f ~ ~ ~ i~ s- Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 1 n. L-216 10687773 -' ---- -- MDT 05/09/04 VVIVI 1 VV 1 L-204 11212880 MDT - ~ 07/24/06 1 1 14-22A 11999036 PPROF W/FLOW SCAN IMAGER -- ~ '~(0 08/17/08 1 1 H-11 12017507 USIT - 08/09/08 1 1 D-22C 11963190 USIT _ '1 ;' (~ 08/20/08 1 1 NK-10 12066549 MEM I JECTION PROFILE !~ - / J g'~ 09/11/08 1 1 09-28A 12031499 RST - 9 08/01/08 1 1 N-10A 12005225 MCNL 08/20/08 1 1 05-23B 40016995 OH MWD/LWD EDIT 05/27/08 2 1 DI CACC A!`1liJA\NI Cnl~C ~L nCInT n _..__-_______--~_..___.. _. -.~......... .~...-..~.... .......w v..~vvr , ~r~aill Iv. BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-283 ATTN: Beth Received by: ~ ~" • • <,~ DATA SUBMITTAL COMPLIANCE REPORT 9/12/2008 Permit to Drill 2060920 Well Name/No. PRUDHOE BAY UN ORIN L-204 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23314-00-00 MD 11965 TVD 4722 Completion Date 9/3/2006 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: MWD / GR /RES / AZI DEN / NEU /AIM / PWD, MWD / GR /RES ! A (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / type meairrmi rvurnoer rvame scale meaia No Start Stop CH Received Comments D Asc Directional Survey 0 11965 Open 9/14/2006 Rpt Directional Survey 0 11965 Open 9/14/2006 / C Lis r~D 15704 Induction/Resistivity 486 11964 Open 11/19/2007 LIS Veri, GR, ROP, FET, RPD, RPS, DRHO, NPHI w/PDS and Tif graphics ~,. Cog 15704 Induction/Resistivity 5 Blu 108 11965 Open 11/19/2007 MD Vision Services 2-Aug- 2006 i .L6g 15704 Induction/Resistivity 5 Blu 108 11965 Open 11/19/2007 TVD Vision Services 2-Aug- 2006 Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y ~ Daily History Received? f~,/ N Chips Received? 1~l-Pl-, Formation Tops Q N Analysis Y~ Received? Comments: Compliance Reviewed By: Date: a 11 /09/07 Schlumberger Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Log Description NO. 4491 Company: Alaska Oil & Gas Cons Comm ANn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Orion Date 8L Color CD L-204 40013758 OH MWDILWD EDIT 08102106 2 1 L-204L7 L-204L2 40013758 40013758 OH MWDILWD EDIT OH MWD/LWD EDIT 08107106 08112106 2 2 1 1 L-204L3 L-204L4 40013758 40013758 OH MWDILWD EDIT OH MWD/LWD EDIT 08120/06 08129/06 2 2 1 1 PLEASE ACKNOWLEDGE RECEIPT BV SIGNING AND RETURNING ONE COPY EACii TO: BP Exploration lAlaska) Inc. Petrotechnical Dafa Center LF"'' ~ ~~ t ~ ~'~ 900 E Benson Blvd r( ~ 't, Anchorage AK 99508-4254 ' - Date Delivered: ~$~d ~ a`1 ~ ("le l~T .l r~ r_TCFT 's Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503- 38 ATTN: Beth _.-~' ~~ / Received by: V .1 AEI ~ 6 STATE OF ALASKA '~ ~,Q6 ',~' ~ p AND GAS CONSERVATION COMMISSION ~~•~ WELL O~>~~~~,k~i1R RECOMPLETION REPORT AND LOG Alaska Oii & ~asi,r~ra~e Revised: 12/27/06, Put on Production 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG 2oAAC 2s.ios 20AAC 25.110 ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1 b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban 9/3/2006 ,Od 12. Permit to Drill Number 206-092 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded ~ 7/16/2006 13. API Number 50-029-23314-00-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 7/31/2006 14. Well Name and Number: PBU L-204. 2423 FSL, 3544 FEL, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 1928' FSL, 354' FWL, SEC. 35, T12N, R11 E, UM (OBc) 8. KB Elevation (ft): 78.6' 15. Field /Pool(s): Prudhoe Bay Field / Orion Total Depth: 2' FSL, 302' FWL, SEC. 36, T12N, R11 E, UM 9. Plug Back Depth (MD+TVD) 11965 + 4722 Ft Schrader Bluff 4b. Location of Well (State Base Plane Coordinates): Surface: x- 583372 y- 5978147 Zone- ASP4 10. Total Depth (MD+TVD) 11965 + 4722 Ft 16. Property Designation: ADL 028240 TPI: x- 587276 y- 5977696 Zone- ASP4 Total Depth: x- 592529 y- 5975833 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD / GR, MWD / GR /RES / AZI DEN /NEU !PWD, MWD / GR /RES / AZI DEN /NEU /AIM /PWD, MDT 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT SIZE WT. PER FT. GRADE TOP BOTTOM TOP .BOTTOM SIZE CEMENTING RECORD PULLED 20" x 34" 215.5# A53 Surface 109' Surface 109' 48" 260 sx Arctic Set A rox. 10-3/4" 45.5# K-55 29' 3457' 29' 2778' 13-1/2" 596 sx AS Lite 469 sx Class'G' 7-5/8" 29.7# L-80 26' 6670' 26' 4632' 9-7/ " 42 sx Class ' ' 4-1/2" 12.6# L-80 701 11963' 4641' 4722' 6-3/4" Uncemented Slotted Liner 23. Perforations open to Production (MD + TVD of Top and 24. TUBING RecoRD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD 4-1/2" Slotted Section 4-1/2", 12.6#, 13Cr80 / L-80 5887' 5812' MD TVD MD TVD 7451' - 11961' 4603' - 4722' 25. Aclo, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT H~ KIND OF MATERIAL USED 2550' Freeze Protect w/ 106 Bbls of Diesel 26. PRODUCTION TEST Date First Production: December 5, 2006 Method of Operation (Flowing, Gas Lift, etc.): Gas Lift Date of Test 12/16/2006 Hours Tested 6 PRODUCTION FOR TEST PERIOD OIL-BBL 579 GAS-McF 138 WATER-BBL -0- CHOKE SIZE 96 GAS-OIL RATIO 238 FIOW TUbing Press. 580 CaSing PreSSUre 1,440 CALCULATED 24-HOURRATE• OIL-BBL 2,315 GAS-MCF 552 WATER-BBL -0- OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet; _if n~;a~~ary). Submit core chips; if none, state "none". 3~ ~~~~ ~ None 3 `~ i=i a,~ a Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE AFL JUJ. 0 31DD9 28. ~w GEOLOGIC MARKS 29. ORMATION TESTS Include and briefly summarize test results. List intervals tested, Na,~we MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Ugnu 3609' 2877' Ugnu MA 5272' 3942' MDT was ran, analysis attached. Schrader Bluff NA 5675' 4207' Schrader Bluff NB 5714' 4233' Schrader Bluff NC 5765' 4266' Schrader Bluff NE 5779' 4275' Schrader Bluff NF 5865' 4329' Schrader Bluff OA 5935' 4371' Schrader Bluff OBa 6071' 4444' Schrader Bluff OBb 6166' 4490' Schrader Bluff OBc 6319' 4551' Schrader Bluff OBd 6501' 4604' Schrader Bluff OBd 7263' 4628' Schrader Bluff OBc 8098' 4603' Schrader Bluff OBc 8307' 4608' Schrader Bluff OBc 8484' 4613' Schrader Bluff OBc 8554' 4615' Schrader Bluff OBc 9089' 4631' Schrader Bluff OBc 9113' 4632' Schrader Bluff OBc 9662' 4649' Schrader Bluff OBc 9874' 4654' Schrader Bluff OBc 11194' 4689' Schrader Bluff OBc 11241' 4691' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble ~ Title Technical Assistant Date ~ ~Z7 ~(,, PBU L-204 206-092 Prepared By Name/Number. Terrie Hubble, 564-4628 Drilling Engineer: Well Number Permit No. / A royal No. Scott Kolstad, 564-5347 INSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only STATE OF ALASKA OCT 0 ~ 2006 ALAS IL AND GAS CONSERVATION COM r °'SION ka Qot & Gas Cons. Comm~ss~on WELL CO~ItPtETION OR~R~ECOMPLETION REPORT AND L~~ Rnchorage 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zoAACZS.~os zoAACZS.~~o ^ GINJ ^ W1NJ ^ WDSPL No. of Completions One Other 1b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 9/3/2006 12. Permit to Drill Number 206-092 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 7/16/2006 13. API Number 50-029-23314-00-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 7/31/2006 14. Well Name and Number: PBU L-204 2423 FSL, 3544 FEL, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 1928' FSL, 354' FWL, SEC. 35, T12N, R11 E, UM (OBc) 8. KB Elevation (ft): 78.6' 15. Field /Pool(s): Prudhoe Bay Field / Orion Total Depth: 2' FSL, 302' FWL, SEC. 36, T12N, R11E, UM 9. Plug Back Depth (MD+TVD) 11965 + 4722 Ft Schrader Bluff 4b. Location of Well (State Base Plane Coordinates): Surface: x- 583372 y- 5978147 Zone- ASP4 10. Total Depth (MD+TVD) 11965 + 4722 Ft 16. Property Designation: ADL 028240 TPI: x- 587276 y- 5977696 Zone- ASP4 Total Depth: x- 592529 y- 5975833 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD / GR, MWD / GR /RES / AZI DEN /NEU /PWD, MWD / GR /RES / AZI DEN /NEU /AIM /PWD, MDT 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT SIZE WT. PER FT. GRADE TOP BOTTOM i TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" x 34" 215.5# A53 Surface 109' Surface 109' 48" 260 sx Arctic Set A rox. 10-3/4" 45.5# K-55 29' 3457' 29' 2778' 13-1/2" 596 sx AS Lite 469 sx Class'G' 7-5/8" 29.7# L-80 26' 667 ' 26' 4632' 9-7/8" 542 sx Class 'G' 4-1/2" 12.6# L-80 7018' 11963' 4641' 4722' 6-3/4" Uncemented Slotted Liner 23. Perforations open to Production (MD + TVD of Top and 24. TueING RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD 4-1/2" Slotted Section 4-1/2", 12.6#, 13Cr80 / L-80 5887' 5812' MD TVD MD TVD 7451' - 11961' 4603' - 4722' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT H~ KIND OF MATERIAL USED 2550' Freeze Protect w/ 106 Bbls of Diesel 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test Hours Tested PRODUCTION FOR TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO FIOW TUbing PfeSS. CaSing PreSSUre CALCULATED 24-HOUR RATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". s ~~~ ®~~ ~ ~ 2flQ~ None 9- Form 10-40~~~~2003 CONTINUED ON REVERSE SIDE ~ i _ u,. 28. GEOLOGIC MARKS 29. ORMATION TESTS Include and briefly summarize test results. List intervals tested, NaMe MD TVD and attach detailed supporting data as necessary. If no tests were conducted state "None". Ugnu 3609' 2877' Ugnu MA 5272' 3942' MDT was ran, analysis attached. Schrader Bluff NA 5675' 4207' Schrader Bluff NB 5714' 4233' Schrader Bluff NC 5765' 4266' Schrader Bluff NE 5779' 4275' Schrader Bluff NF 5865' 4329' Schrader Bluff OA 5935' 4371' Schrader Bluff OBa 6071' 4444' Schrader Bluff OBb 6166' 4490' Schrader Bluff OBc 6319' 4551' Schrader Bluff OBd 6501' 4604' Schrader Bluff OBd 7263' 4628' Schrader Bluff OBc 8098' 4603' Schrader Bluff OBc 8307' 4608' Schrader Bluff OBc 8484' 4613' Schrader Bluff OBc 8554' 4615' Schrader Bluff OBc 9089' 4631' Schrader Bluff OBc 9113' 4632' Schrader Bluff OBc 9662' 4649' Schrader Bluff OBc 9874' 4654' Schrader Bluff OBc 11194' 4689' Schrader Bluff OBc 11241' 4691' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. ~ D~~3 O Si d gne Terrie Hubbl Title Technical Assistant Date ~ PBU L-204 206-092 Prepared By NameMumber: Terrie Hubble, 564-4628 Well Number Permit No. / A rOVal NO. Drilling Engineer: Scott KOlStad, 564-5347 INSTRUCTIONS GeNewu: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. treM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: True vertical thickness. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 28: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: If no cores taken, indicate "None". ITeM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only L-204_MDT data sheet_Analysis (4).XLS _,._ well: L-204 Date: 7/24-25/2006 / ~T 1 «_ . Depth Hydrostatic Formation, _ Drawdown On Set Point Planned Actual TVDSS Before After Diff Pressure ': MWE Mobility (md/cp) Temp (rninutesJ Comments P/F Interval 1 6oJa ba42 3y~a.1 7916.0 ~ lalb.u 1.v 1/oi.v =. 8.62 119.2 84.0 13.4 woteat P j Mb1 2 5413 5413 3955.8 1938.0 i 1938.0 0.0 1810.0 8.63 35.1 84.0 16.3 good test P Mb1 3 5450 5451 3980.8 1951.0 ' 1950.0 ~ 1.0 1815.0 8.60 136.5 85.0 12.1 lost seal 2X at 5450' /good test at 5451 P Mb2 4 5490 5490 4006.4 1964.0 i 1962.0 2.0 1826.0 8.60 130.8 86.0 9.2 good test P Mb2 5 5547 5547 4043.8 1980.0 1979.0 1.0 1841.0 8.59 ! 128.7 86.0 11.0 good test P Mb2 6 5599 5599 4078.0 1996.0 1996.0 0.0 1853.0 8.57 ! 288.8 86.0 11.4 good test P ~ MC 7 5650 5650 4111.7 2014.0 2012.0 2.0 1868.0 8.57 8.6 86.0 14.0 ood test P MC 8 5727 5727 4162.7 2037.0 2036.0 ~ 1.0 1894.0 8.59 ' 32.1 87.0 20.4 good test P Nb 9 5781 5784 4198.0 2056.0 2054.0 ! 2.0 1930.0 0.9 87.0 22.4 no good test at 5781, move to 5784--low perm P Ne 10 5940 5940 4295.0 .2101.0 2100.0 i 1.0 1889.0 8.31 64.6 89.0 9.4 good test P OA 11 5956 5956 4304.1 2106.0 2105.0 ` 1.0 1893.0 8.31 i 56.1 89.0 10.5 good test P OA 12 5979 5979 4316.8 2113.0 2111.0 i 2.0 1898.0 8.30 32.8 89.0 9.0 good test P OA 13 6004 6004 4330.4 2120.0 2117.0 3.0 1905.0 8.31 7.8 89.0 10.4 good test--low mobility P OA 14 6075 6075 4367.5 2136.0 , 2135.0 ; 1.0 1906.0 0.7 90.0 15.5 good test P OBa 15 6077 6077 4368.6 2138.0 2135.0 3.0 1897.0 8.20 8.7 90.0 8.2 good test P OBa 16 6089 6089 4374.5 2142.0 2138.0 ! 4.0 1900.0 I 8.21 117.6 90.0 8.5 good test P/F OBa 17 6107 6107 4383.4 2146.0 2144.0 I 2.0 91.0 9.1 lost seal P OBa 18 6109 6109 4384.3 2146.0 2143.0 ~ 3.0 ' 1920.0 2.4 91.0 12.3 good test P OBa 19 6122 6122 4390.6 2151.0 ; 2146.0 5.0 1917.0 8.25 9.2 91.0 9.2 good test P OBa 20 6122 6124 4391.6 2151.0 ~ 2147.0 4.0 1919.0 8.26 ' 97.2 91.0 11.3 good test P/F OBa 21 6177 6177 4415.9 2160.0 i 2158.0 I 2.0 1896.0 8.11 12.4 91.0 9.4 good test P OBb 22 6177 6179 4416.7 2161.0 2159.0 ~ 2.0 0.2 91.0 12.4 slow build up P OBb 23 6196 6196 4424.1 2167.0 2163.0 4.0 1896.0 8.10 78.7 92.0 9.0 good test P/F OBb 24 6322 6322 4473.3 2187.0 ' 2185.0 2.0 1.0 92.0 13.0 slow buildup P OBc 25 6322 6324 4474.0 2188.0 2186.0 i 2.0 1948.0 8.23 49.4 92.0 8.4 good test P/F OBc 26 6330 6330 4476.1 2192.0 2187.0 5.0 1950.0 ! 2.6 92.0 11.2 good test P OBc 27 6338 6338 4479.0 2193.0 ' 2190.0 3.0 93.0 8.2 lost seal P OBc 28 6338 6336 4478.2 2189.0 2190.0 ! -1.0 93.0 10.1 lost seal P OBc 29 6338 6340 4479.6 2194.0 i 2189.0 ~ 5.0 1951.0 8.23 36.2 ~ 93.0 9.1 ood test P/F OBc 30 6521 6521 4529.8 2213.0 2212.0 ; 1.0 2018.0 8.42 € 5.6 93.0 10.2 good test P OBd 31 6521 6523 4530.2 2214.0 2213.0 1.0 2018.0 8.42 5.9 93.0 9.1 good test P : OBd 32 6586 6586 4542.0 2220.0 2218.0 ~ 2.0 2013.0 8.38 115.7 93.0 8.5 ood test P/F ': OBd ' BP Alaska Well L-204 I ' No. ~ MD -: TVDSS Sand ~ Comments '; '; 1' 5956 4304.1 OA ~ 1-gallon chamber (SC 292 ' 2 6324 __ 4474.0 OBC_ '~ one 450-m1 chamber (MS 1402 4 6196 4424.1 _ OBb two 450-m1 chambers (MS 1400 & MS 1397) ~--- 5 6124 3991.6 IOwer OBa 1- allon chamber (SC 226 6 6586 4542.0 OBd two 450-m1 chambers MS 1401 & MS 1398 I FLUID SAMPLE COMMENTS: I ;Fluid Sam le #3 (U r OBa): Slow cleanin u ,could not obtain sample. A lot of water invasion-- this is close to where the ri had stuck i e 6118; MD and some circulatin was done Fluid Sam le #7 (Mb2 : Attempt to collect at 5453' MD-- note that Burin ressure test, oint at 5450' MD had a lost seal-- it is ossible the sand here could be washed out talked to Gre Bernaski about this--'rf couldn't et a sam le, would move down -20' and rat .Sam le was not obtained, did not clean u (filtrate after 80 minutes of um in -- moved to different s of Fluid Sam le #8 (Mb2 : Second attempt to collect, this time at 5473' MD-- filtrate at this de th did not cleanu after 165 minutes of um in , so after discussin with Gre Bernaski, decided to cease sam lin o erations and pull out of the hole. 'NOTE: After discussions with Dennis Weathers, Schlumber er en ineer, his thou hts were that after about 4 fluid sam les (the norm, in his experience), the um outs start seein a lot of wear and tear due to the abrasive ualit of the Schrader Bluff sands-- same goes for the ackers. The samplin program went extreme) well considerin this, and it is ve likely that b sthe time we tried to collect the Mb2 sam le, the a ui ment was wom out because of this. ;The second pump-out started being used during collection of fluid sam le oint #5 Page 1 ~~~i~~ = ~ i FROM RESERVOIR TO RESULTS. Oilphase-DBR Sampling 8~ Analysis Services Schlumberger WCP, Pouch 340070 Spine Road Prudhoe Bay, Alaska 99734 USA ph: 1 907-659-2487 BP Exploration Alaska ~ADW) MDT Field Operations Report Job No: AK 023 Field: Orion Well: L-204 Date: 24 to 29 July 2006 Rig: 9ES MDT Run: 1 SAMPLING OPERATION PERSONNEL: Client Representative: Greg Bernaski MDT Personnel: Dennis Weathers Oilphase Personnel: Matthew Allen The data in this report remains the property of the client and may not be disclosed or reproduced without the client's permission. ©2005 Oilphase-DBR Sampling Services -Sampling Report (Field Test -Rev-01). Client BP Exploration Alaska (ADW) Well: L-204 Job #: AK 023 Field: Orion ~~~~~~ Date: 24 to 29 July 2006 Rig: 9ES TABLE OF CONTENTS Summary ............................................................................. Sequence of Events ..................................................................... Sample Listing ............................................................................ 1 2 3 The data in this report remains the property of the client and may not be disclosed or reproduced without the client's permission. © 2005 Oilphase-DBR Sampling Services -Sampling Report (Field Test -Rev-01). ii Client BP Exploration Alaska (ADW) Well: L-204 Job #: AK 023 Field: Orion ~~~~~~~~ Date: 24 to 29 July 2006 Rig: 9ES Summary Over the course of 24 to 25 April 2006, Schlumberger Wireline ran their Modular Formation Dynamics Tester (MDT) into well L-204 via drill pipe (TLC). The sampling program consisted of running two 1-gallon sample chamber and one multi-sample modules, which was comprised of six MPSR sample bottles. The primary objective of this logging run was to capture several high-quality pressurized hydrocarbon samples for PVT analysis. The first sampling point consisted of filling one 1-gallon MRSC (292) at 5,956 ft MD in the OA sand. One MPSR (1402) was filled at the second sample point of 6,324 ft MD in the OBc sand. One MPSR (1399) was captured in the Upper OBa sand at 6,089 ft MD. The fourth sampling point in the OBb sand at 6,196 ft MD was comprised of two MPSRs (1400 & 1397). One 1-gallon MRSC (226) was filled at the fifth sampling depth of 6,124 ft MD in the Lower OBa sand. The sixth and final sampling point of 6,586 ft MD consisted of filling two MPSRs (1401 & 1398) in the OBd sand. An attempt was made to capture a sample in the Mb2 sand but was unsuccessful. Upon retrieval to surface, the sample chambers were transported back to the Schlumberger base in Prudhoe Bay, AK. An opening pressures was obtained on the 1-gallon sample chamber (MRSC 292) prior to heating and agitating the samples for ten hours. Upon completion of restoring the 1-gallon sample chamber, the sample was transferred into two Conventional Sample Bottles (CSB). The remaining fluid in MRSC 292 was blown down into a 1 gallon IATA steel can. Opening pressures were obtained on the six MPSRs prior to bleeding down each sample into atmospheric containers. An opening pressure was also obtaining on the 1- gallon sample chamber (MRSC 226) prior to bleeding the contents into an atmospheric container for shipping. Both pressurized hydrocarbon samples have been sent on to the Oilphase-DBR PVT lab in Houston, TX for analysis. The atmospheric oil samples collected have been sent on the Baseline Lab in Shenandoah, TX. The data in this report remains the property of the client and may not be disclosed or reproduced without the client's permission. © 2005 Oilphase-DBR Sampling Services -Sampling Report (Field Test -Rev-01). Client BP Exploration Alaska (ADW) Well: L-204 Job #: AK 023 Field: Orion ~~~~~~~~ Date: 24 to 29 July 2006 Rig: 9ES Sequence of Events Date Time Event 24-Jul-06 7:00 Run MDT in hole via drill pipe (TLC) 25-Jul-06 0:34 Fire MRSC 292 open 1:05 Fire MRSC 292 closed capturing sample at 5,956 ft MD 3:31 Fire MPSR 1402 open 3:41 Fire MPSR 1402 closed capturing sample at 6,324 ft MD 5:52 Fire MPSR 1399 open 5:58 Fire MPSR 1399 closed capturing sample at 6,089 ft MD 7:49 Fire MPSR 1400 open 7:54 Fire MPSR 1400 closed capturing sample at 6,196 ft MD 7:55 Fire MPSR 1397 open 8:00 Fire MPSR 1397 closed capturing sample at 6,196 ft MD 10:07 Fire MRSC 226 open 10:58 Fire MRSC 226 closed capturing sample at 6,124 ft MD 13:43 Fire MPSR 1401 open 13:42 Fire MPSR 1401 closed capturing sample at 6,586 ft MD 13:46 Fire MPSR 1398 open 13:48 Fire MPSR 1398 closed capturing sample at 6,586 ft MD 27-Jul-06 18:00 Schlumberger equipment arrived back to base in Prudhoe Bay 28-Jul-06 4:00 Remove MPSRs from Multi-Sample Module 9:30 Obtained opening pressure on 1-gallon MRSC 292 (2,900 psig @ 71 F) 9:45 Commenced heating MRSC 292 (5,000 psig @ 100 F) 11:00 Obtained opening pressure on MPSR 1399 (0 psig @ 71 F) 11:10 Commenced bleeddown of MPSR 1399 into glass jar (sample 1.09) 11:20 Obtained opening pressure on MPSR 1397 (3,500 psig @ 71 F) 11:25 Commenced bleeddown of MPSR 1397 into glass jar (sample 1.11) 11:40 Obtained opening pressure on MPSR 1398 (4,300 psig @ 71 F) 11:45 Commenced bleeddown of MPSR 1398 into glass jar (sample 1.14) 15:00 Obtained opening pressure on MPSR 1400 (0 psig @ 71 F) 15:05 Commenced bleeddown of MPSR 1400 into glass jar (sample 1.10) 15:25 Obtained opening pressure on MPSR 1401 (4,500 psig @ 71 F) 15:30 Commenced bleeddown of MPSR 1401 into glass jar (sample 1.13) 16:00 Obtained opening pressure on MPSR 1402 (1,000 psig @ 71 F) 16:10 Commenced bleeddown of MPSR 1402 into glass jar (sample 1.08) 16:30 Obtained opening pressure on MRSC 226 (2,760 psig @ 71 F) 16:40 Commenced bleeddown of MRSC 226 into 1 gallon IATA steel can (sample 1.12) 18:45 Commenced high-pressure transfer of MRSC 292 (5,500 psig @ 100 F) 19:20 Completed high-pressure transfer of MRSC 292 into 2 x CSBs (samples 1.05 & 1.06) 19:25 Commenced bleeddown of remaining contents of MRSC 292 into 1 gallon IATA steel can (sample 1.07) 30-Jul-06 8:00 Delivered pressurized samples to Lynden Transport for shipment to Oilphase PVT Lab in Houston, TX 8:00 Delivered atmospheric samples to Lynden Transport for shipment to Baseline Lab in Shenandoah, TX The data in this report remains the property of the client and may not be disclosed or reproduced without the client's permission. ©2005 Oilphase-DBR Sampling Services -Sampling Report (Field Test -Rev-01). Client: BP Exploration Alaska (ADW) Well: L-204 Job No: AK 023 Field: Orion Date: 24 to 29 July 2006 Rig: 9ES ~~~~~Yl~i~~~l OPEN-HOLE SAMPLE LISTING Sample Sample Sample Sample Chamber Sample Point P opening Transfer Cond. Final Pressure Bottle Eottle No Date Time Nature SIN psig ~a~ T psig @ T psig ~ T S/N Type MDT Run No: 1 Drilling Fluids Sample Comments Vol (cc) 1.01 24-Jul-O6 12:00 LSND Mud @ TD 6680' Mud Engineer N/A N/A Atmospheric N/A 1L Nalgene .5 L Ship to Baseline 1.02 24-Jul-06 12:00 LOTORO 1/2% in Mud Mud Engineer N/A N/A Atmospheric N/A 1L Nalgene .5 L Ship to Baseline 1.03 24-Jul-06 12:00 ScreenKleen 25% in Mud Mud Engineer N/A N/A Atmospheric N/A 1L Nalgene .5 L Ship to Baseline 1.04 24-Jul-O6 12:00 LubeTex 1/2 % in Mud Mud Engineer N/A N/A Atmospheric N/A 1L Nalgene .5 L Ship to Baseline OA Sand Samples: Oil 5,956 ft MD(TVD=4,304.1'), 1,892.9 psia @ 89.8 F 1.05 25-Jul-06 0:34 1 gal MDT Oil MRSC 292 5,956 ft MD 2,900 @ 71 F 5,500 @ 100 F 900 @ 71 F 7478-MA CSB 595 cc Ship to Oilphase, Houston 1.06 25-Jul-06 0:34 1 gal MDT Oil MRSC 292 5,956 ft MD 2,900 @ 71 F 5,500 @ 100 F 900 @ 71 F 7321-MA CSB 600 cc Ship to Oilphase, Houston 1.07 25-Jul-O6 0:34 1 gal MDT Oil MRSC 292 5,956 ft MD 2,900 @ 71 F 5,500 @ 100 F 0 @ 71 F N/A 1 gal IATA 2.5 L Ship to Baseline OBc Sand Samples: Oil 6,324 ft MD (TVD=4,474.0'), 1,948.3 psia @ 91.6 F 1.08 25-Jul-06 3:31 MPSR Oil MPSR 1402 6,324 ft MD 1000 @ 71 F 0 @ 71 F 0 @ 71 F N/A 1/2 L Glass Jar 450 cc Ship to Baseline Upper OBa Sand Samples: Oil 6,089 ft MD (TVD=4,374.5'), 1,900.3 psia @ 90.5 F 1.09 25-Jul-06 5:52 MPSR Oil MPSR 1399 6,089 ft MD 0 @ 71 F 0 @ 71 F 0 @ 71 F N/A 1/2 L Glass Jar 450 cc Ship to Baseline OBb Sand Samples: Oil 8,196 ft MD(TVD=4,4,24.1'), 1,896.3 psia @ 90.8 F 1.10 25-Jul-06 7;49 MPSR Oil MPSR 1400 6,196 ft MD 0 @ 71 F 0 @ 71 F 0 @ 71 F N/A 1/2 L Glass Jar 350 cc Ship to Baseline 1.11 25-Jul-06 7:55 MPSR Oil MPSR 1397 6,196 ft MD 3,500 @ 71 F 0 @ 71 F 0 @ 71 F N/A 1/2 L Glass Jar 450 cc Ship to Baseline Lower OBa Sand Samples: Oil 6,124 ft MD (TVD=3,991.6'), 1,918 psia @ 90.9 F 1.12 25-Jul-06 10:07 1 gal MDT Oil MRSC 226 6,124 ft MD 2,700 @ 71 F 0 @ 71 F 0 @ 71 F N/A 1 gal IATA 3 L Ship to Baseline OBd Sand Samples: Oil 6,588 ft MD (TVD=4,542.0'), 2,012.6 psia @ 92.8 F 1.13 25-Jul-06 13:43 MPSR Oil MPSR 1401 6,586 ft MD 4,500 @ 71 F 0 @ 71 F 0 @ 71 F N/A 1 L Glass Jar 450 cc Ship to Baseline 1.14 25-Jul-06 13:46 MPSR Oil MPSR 1398 6,586 ft MD 4,300 @ 71 F 0 @ 71 F 0 @ 71 F N/A 1L Glass Jar 450 cc Ship to Baseline • • The data in this report remains the property of the client and may not be disclosed or reproduced without the client's permission. © 2005 Oilphase-DBR Sampling Services -Sampling Report (Field Test -Rev-01). 3 BP Page 1 of 1 Leak-Off Test Summary Legal Name: L-204 Common Name: L-204 --- Test Date i Test Type _- - - -- Test Depth (TMD) Test Depth (TVD) AMW Surtace Pressure Leak Off Pressure (BHP) EMW 1/1/1900 LOT (ft) (ft) (ppg) (psi) (psi) 13.46 (ppg) 7/21/2006 LOT 3,457.0 (ft) 2,778.1 (ft) 8.80 (ppg) 610 (psi) 1,880 (psi) 13.03 (ppg) 7/29/2006 FIT 6,708.0 (ft) 4,632.0 (ft) 9.20 (ppg) 555 (psi) 2,769 (psi) 11.51 (ppg) _~ _~ Printed: 9/5/2006 2:49:50 PM BP Operations Summary Report Page 1 of 31 Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date ;From - To Hours Task j Code NPT Phase Description of Operations 7/15/2006 14:00 - 15:00 1.00 RIGD P PRE 15:00 - 16:00 1.00 MOB P PRE 16:00 - 17:00 1.00 RIGD P PRE 17:00 - 18:30 1.50 MOB P PRE 18:30 - 21:30 3.00 DIVRTR P PRE 21:30 - 23:00 1.50 MOB P PRE 23:00 - 00:00 1.00 MOB P PRE 7/16/2006 00:00 - 01:00 1.00 RIGU P PRE 01:00 - 02:00 1.00 RIGU P PRE 02:00 - 03:00 1.00 RIGU P PRE 03:00 - 03:30 0.50 RIGU P PRE 03:30 - 04:00 0.50 RIGU P PRE 04:00 - 05:00 1.00 RIGU P PRE 05:00 - 07:30 2.50 DIVRTR P PRE 07:30 - 08:30 1.00 RIGU P PRE 08:30 - 09:00 0.50 RIGU P PRE 09:00 - 11:00 2.00 RIGU P PRE 11:00 - 12:00 1.00 RIGU P PRE 12:00 - 12:30 0.50 RIGU P PRE 12:30 - 13:00 0.50 RIGU P PRE 13:00 - 13:30 0.50 DIVRTR P PRE 13:30 - 14:30 1.00 RIGU P PRE 14:30 - 18:00 3.50 RIGU P PRE 18:00 - 21:00 3.00 RIGU P PRE 21:00 - 22:00 1.00 RIGU P PRE 22:00 - 22:30 0.50 RIGU P PRE 22:30 - 00:00 1.50 DRILL P SURF Rig released from L-217i. Ready rig floor, unpin topdrive, bridle up traveling blocks. Move mud pits around pad. Made "critical lift" for removal of diverter lines from L-217i out of critical path. PJSM. Lower pipe chute, lay down derrick. PJSM. Jack rig up and move off of L-2171. Move rig around pad. Nipple up Diverter stack and lines due to lack of space behind rig. See "Daily Operational Comments". PJSM. Position rig in front of conductor. Lay matting boards and herculite for rig. PJSM. Spot rig over conductor. Set matting boards in place. Level rig and set rig down in place. Laydown herculite under mud pit complex. Spot mud pits in place and set matting boards. Set down mud pits down. PJSM. Raise and pin derrick. Take on Spud Mud in mud pits. Raise and pin pipe chute. 'Accept rig ~ 00:00 hr 7/16/2006. (Backed up 3 hrs due to previous Diverter installation). Make up kelly hose to topdrive. Bridle down, pin traveling blocks to topdrive. Change out riser from 16" to 20". Nipple up 20" riser. Install dresser sleeve and turn-buckles. Rig up rig floor, remove spreader beam over iron roughneck. Inspect topdrive quilt - OK. Put all floor equipment in it's proper place. Service topdrive and crown section. Continue load and strap 4" drillpipe and HWDP in pipe shed. Cut and slip drilling line 76'. Attempt to pick up drillpipe to rack back in derrick. Hit ice plug ~ 40 feet. Pick up and make up 13.5" bit, NBSTB, and crossover to drillpipe to drill ice plug. Function test diverter system. Perform accumulator test. Witnessing of test waived by AOGCC rep Chuck Shieve. Witnessed by NAD TP Kelly Cozby. '*Note: Crew held Pre-Spud meeting during their Pre-Tour meeting. Fill conductor and check for leaks - OK. Cleanout ice from 40' to 105'. Laydown bit and NBSTB Pick up drillpipe, HWDP, jar stand, and rack back in derrick. Pick up and make up 13.5" directional BHA #1. Bit - RR1 MX-C1, 1.83 deg PDM. Orient motor with MWD. Rig up Gyro Data and Sperry W L. Pressure test mud lines, stand pipe and mud manifold to 3,500 psi - OK. Spud in L-204 ~ 22:30 hr 7/16 2006. Drill 13.5" surface hole from 109' to 263'. 500 gpm, 520 psi, 40 rpm, 780 fUlbs torque. PU, SO, RT - 55k. ART - .34 hr. Lost 200 bbls. spud mud immediatly after drilling out of conductor cement, to app. 325 ft. treated with Poly Pac Supreme to heal losses. Printed: 9/5/2006 2:49:57 PM • BP Operations Summary Report Page 2 of 31 Legal Well Common W Event Nam Contractor Rig Name: Date Name: L ell Name: L e: Name: From - To j -204 -204 DRILL+C NABOBS NABOB Hours OMPLE ALASK S 9ES ~ Task TE A DRI Code LING NPT Start I Rig Rig Phase Spud Date: 7/16/2006 : 7/15/2006 End: 9/3/2006 Release: 9/3/2006 Number: Description of Operations 7/17/2006 00:00 - 01:30 1.50 DRILL P SURF Continue drilling 13.5" surface hole from 263' to 447'. Started kick-off ~ 300'. Gyro surrey every stand. 550 gpm, 780 psi on, 730 psi off. 40 rpm, 3k TO on, 1.5k TO off. PU - 65k, SO - 64k, RT - 65k, WOB - 30k. 01:30 - 02:00 0.50 DRILL P SURF POH from 447' to 170'. Pick up jar stand. 02:00 - 02:30 0.50 DRILL P SURF Run in hole from 170' to 447' without problem. 02:30 - 12:00 9.50 DRILL P SURF Continue drilling directionally from 447' to 1,097'. Continue gyro surveys every stand to last survey ~ 1,097' (bit depth). 700 gpm, 2,130 psi on, 2,010 psi off, 60 rpm, 4.5k TO on, 2k TO off. PU - 72k, SO - 65k, RT - 70k, WOB - 30k. Backream 30' prior to connections. ART - 1.73 hrs, AST - 4.6 hrs. 12:00 - 12:30 0.50 DRILL P SURF Rig down Sperry WL and Gyro Data tools. 12:30 - 16:30 4.00 DRILL P SURF Continue drilling directionally from 1,097' to 1,670'. 700 gpm, 2,400 psi on, 2,200 psi off, 60 rpm, 3.7k TO on, 1.7k TO off. PU - 80k, SO - 70k, RT - 75k, WOB - 35k. Backream 30' prior to connections. ART - 1.75 hrs, AST - 3.18 hrs. 16:30 - 18:00 1.50 DRILL P SURF Circulate bottoms up 3 times ~ 700 gpm, 2,465 psi, 60 rpm, 2.1 k TO. Hole unloaded good amount of clay balls during circulation. Circulated until shakers cleaned up. 9.1 ppg MW, 300 Vis. 18:00 - 19:00 1.00 DRILL P SURF Monitor well - OK. POH from 1,670' to 269'. Had 1 stand swabbing from 1,060' to 1,040'. Wiped full stand through several times and quit swabbing. No other problems. 19:00 - 21:00 2.00 DRILL P SURF Laydown UBHO sub, bit, and adjust motor from 1.83 deg to 1.5 deg. Make up new bit #2 MX-C1 and stabilizer. 21:00 - 22:30 1.50 DRILL P SURF Run in hole with BHA #2 to bottom ~ 1,670' without problem. 22:30 - 23:00 0.50 DRILL P SURF Circulate bottoms up C~? 500 gpm, 2,150 psi, 60 rpm, 2k TO. Returned large amount of clay on bottoms up. 23:00 - 00:00 1.00 DRILL P SURF Continue drilling directionally from 1,670' to 1,770'. 700 gpm, 2,585 psi on, 2,250 psi off, 60 rpm, 4.7k TO on, 2.8k TO off. PU - 80k, SO - 70k, RT - 75k, WOB - 35k. Backream 30' prior to connections. ART - .38 hrs. "No mud losses for the day. Start cutting viscosity back towards target of 200-250 ~ flowline. 7/18/2006 00:00 - 08:30 8.50 DRILL P SURF Continue drilling directionally from 1,770' to TD ~ 3,470' MD, 2,786' TVD. 680 gpm, 3,420 psi on, 3,350 psi off, 80 rpm, 5.6k TO on, 3.4k TO off. PU - 114k, SO - 79k, RT - 93k, W OB - 30k. Backream 30' prior to connections. Reduced pump rate to 680 gpm's due to pump liner limitations. Cut viscosity back to 200-250 C~ flowline. "Encountered 1st hydrates C~3 2,070' and continued to TD. Hydrates were very light and didn't cause any problems. TD 13.5" Surface Hole ~ 08:30 hr 7/18/2006. 08:30 - 10:30 2.00 DRILL P SURF Circulated 3 times bottoms up ~ 700 gpm, 3,370 psi, 100 rpm, 3.9k TQ. 9.7 ppg MW. 10:30 - 12:00 1.50 DRILL P SURF Monitor well - OK. Short trip from 3,470' to 1,670'. PU - 125k, SO - 75k. Intermittent overpull 15-20k through base of permafrost and transition zone. Wiped clean through overpull areas. Observed small amount hydrates breaking out during trip with no effect on trip. No pumping or rotating when wiping hole. 12:00 - 13:30 1.50 DRILL P SURF Run in hole from 1,670' to 3,470' without problems. Re-wiped base of permafrost and transition zones without pumping or rotating. Printed: 9/5/2006 2:49:57 PM BP Operations Summary Report Page 3 of 31 Legal Well Common W Event Nam Contractor Rig Name: Date ( Name: L ell Name: e: Name: From - To j -204 L-204 DRILL+C NABOBS NABOB Hours OMPLE ALASK S 9ES Task TE A DRI Code LING NPT Start I Rig Rig Phase Spud Date: 7/16/2006 : 7/15/2006 End: 9/3/2006 Release: 9/3/2006 Number: Description of Operations 7/18/2006 13:30 - 15:30 2.00 DRILL P SURF Circulate and condition mud 3 times bottoms up ~ 700 gpm, 3,365 psi ICP, 3,030 FCP. 100 rpms, 4.9k TO, PU - 120k, SO - 80k, RT 118k. Returned large amounts of clay back early prior to bottoms up. Shakers cleaned up after 2nd bottoms up. 9.6 PP9 MW. 15:30 - 18:00 2.50 DRILL P SURF Monitor well - OK. POH to run casing from 3,470' to 269'. Wipe through base of permafrost and transition zone without pumping or rotating. 18:00 - 20:00 2.00 DRILL P SURF Laydown BHA #2. Layed down all STABs, NM lead DC, MWD, motor and bit. 20:00 - 21:00 1.00 DRILL P SURF Clear rig floor of drilling tools. Clean mud off of rig floor. 21:00 - 23:30 2.50 CASE P SURF Rig to run 10 3/4" casing. Make dummy run with fluted casing hanger and landing joint. 23:30 - 00:00 0.50 CASE P SURF PJSM. Pick up and make up 10 3/4" 45.5# K-55 BTC casing shoe track. Baker-Lok 1st 3 joints with make up to mark C~ 7,500 ft/Ibs torque. Check floats - OK. 'No mud losses for the day. 7/19/2006 00:00 - 04:00 4.00 CASE P SURF Continue running in hole with 10 3/4" 45.5# K-55 BTC surface casing from 120' to 1,850' without problem. PU - 140k, SO - 80k. Ran in hole filling every joint with casing fill-up tool ~ 80 fpm with full displacement. Started pushing mud away between 1,850 to 2,030' where the casing started taking weight. Lost appx 6 bbls. Make up casing using Best-O-Life 2000 pipe lubricant. Used 25 bowspring centralizers on the 1st 25 joints. 04:00 - 05:00 1.00 CASE P SURF Circulate bottoms up while working pipe between 2,030' and 2,090' Staged pumps up to 6.5 bpm, 400 psi. Lost appx 20 bbls while establishing circulation with hole partially packing off. Had full returns without losses after rate was up to and over 3 bpm. Returned good amount of clay early back to shakers. Shakers cleaned up after initial clay came up. 05:00 - 07:30 2.50 CASE P SURF Run in hole from 2,090' to 2,160 without pumping. Set down ~ 2,160' and started washing from 2,160' to 2,360' ~ 5 bpm, 390 psi. No mud losses. 07:30 - 09:00 1.50 CASE P SURF Run in hole from 2,360' to 2,625 without pumping. Set down ~ 2,625'. No mud losses 09:00 - 11:30 2.50 CASE P SURF Stage pumps up to 5 bpm with good returns. Precautionary wash from 2,625' to 3,450' @ 5 bpm, 420 psi. No mud losses. 11:30 - 12:00 0.50 CEMT P SURF Land casing on depth with shoe ~ 3,457'. Laydown casing fill-up tool, make up cement head. PU - 175k, SO - 100k. Ran total of 82 joints of 10.75" 45.5# K-55 BTC casing. Float collar ~ 3,371' 12:00 - 15:30 3.50 CEMT P SURF Circulate and condition mud to a 55 vis and YP of 14. 8.2 bpm, 400 psi, PU - 225k, SO - 100k. Reciprocated pipe throughout circulation in 3 ft. strokes due to hanger hanging up in the diverter stack. No mud losses. Held cementing PJSM while circulating. 15:30 - 19:00 3.50 CEMT P SURF Switch over to Dowell. Pump 5 bbls of water. Pressure test -ines to 3,500 psi - OK. Pump 80 bbls of 10.1 ppg MudPush II spacer @ 5.5 bpm, 25 psi ICP, 115 psi FCP. Shut down and drop bottom plug. Mix and pump 477 bbls, 597 sx of 10.7 ppg of Arctic Set Lite lead cement slurry @ 6 bpm, 140 psi ICP, 280 psi FCP. Mix and pump 97 bbls, 468 sx of 15.8 ppg Class Printed: 9/5/2006 2:49:57 PM BP Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To 7/19/2006 ~ 15:30 - 19:00 19:00 - 20:00 20:00 - 22:00 22:00 - 00:00 7/20/2006 00:00 - 01:30 PagE4of31 L-204 L-204 Spud Date: 7/16/2006 DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 NABORS ALASKA DRILLING I Rig Release: 9/3/2006 NABORS 9ES Rig Number: Hours Task , Code i NPT Phase Description of Operations 3.501 CEMT P I SURF 1.00 CEMT P SURF 2.00 CASE P SURF 2.00 DIVRTR P SURF 1.50 DIVRTR P SURF 01:30-04:001 2.501WHSURIP I ISURF 04:00 - 06:00 2.00 BOPSU P SURF 06:00 - 07:00 1.00 BOPSU P SURF 07:00 - 08:00 1.00 BOPSU P SURF 08:00 - 08:30 0.50 BOPSU P SURF 08:30 - 09:30 1.00 BOPSU P SURF 09:30 - 13:00 3.50 BOPSU P SURF 13:00-13:30 0.50 BOPSU~P SURF 13:30 - 14:00 0.50 WHSUR P SURF 14:00 - 17:00 3.00 DRILL P INT1 17:00 - 19:00 I 2.001 DRILL I P I I INTi 19:00 - 19:30 I 0.501 DRILL I P I I INT1 19:30 - 21:00 1.501 DRILL ~ P I INTi 21:00 - 22:00 I 1.001 DRILL P I INT1 22:00 - 00:00 I 2.001 DRILL I P I I INT1 7/21/2006 00:00 - 00:15 0.251 DRILL P I INT1 00:15 - 00:30 I 0.251 DRILL I P I I INT1 "G" tail cement slurry ~ 5.8 bpm, 360 psi ICP, 280 psi FCP. Shut down and drop top plug. Kick out plug with 5 bbls of water. Switch over to rig. Displace cement with 320 bbls of 9.5 ppg mud. 1st 310 bbls ~ 8 bpm 266 psi ICP, 765 psi FCP. Remaining 10 bbls pumped @ 4 bpm, 600 psi ICP, 680 FCP. Bumped plug with 2,000 psi ~ 98% pump efc. CIP ~ 18:45 hr. Bleed off pressure and check floats - OK. Observed contaminated cement to surface with 122 bbls of displacement away. Returned prime cement with 201 bbls of displacement away. Stopped reciprocating and set casing on landing ring with 216 bbls of displacement away. 129 total bbls of sidewalk cement back to surface. Had full returns throughout cementing and displacement. Flush diverter stack and lines. Rig down cement head, lay down landing joint. Rig down casing tools, change out bales, and clear floor. Nipple down diverter system. Continue cleaning and nipple down of diverter system. Pick up diverter stack and secure in cellar. Change out riser nipple from 20" to 16". Make up casing head and test metal to metal seals to 1,000 psi - OK. Nipple up tubing spool. Nipple up BOPE. Jack up rig and place cribbage under sub to level rig. Continue nipple up of BOPE. Pick up jet sub and flush stack prior to BOPE test. Rig up to test BOPE. Test all BOPE's to 250 psi low, 3,500 psi high for 5 minutes each. Perform accumulator test. Test witnessed by AOGCC rep John Crisp, BP WSL Alan Madsen, NAD TP Kelly Cozby. Rig down BOP test equipment. Install wear bushing. Pick up drill pipe out of pipe shed to 1,600' then POH racking back in derrick. PJSM, Pick up and make up BHA # 3. 9 7/8" Re-built DSX147, 1.5 deg PDM, ARC, ADN. Load nuclear sources and orient MWD to motor. Run in hole with BHA # 3 on HWDP to 996'. Shallow hole test MWD - OK, 617 gpm, 1,220 psi. Run in hole picking up drill pipe out of pipe shed from 996' to 3,204'. Placed ghost reamer 1,675' above bit. Circ air out of drill pipe. Pressure test 10 3/4" 45.5# K-55 BTC casing to 2,500 psi / 30 minutes - 0 psi loss. Wash down and tag top of cement @ 3,365'. Drill out cement, float collar on depth ~ 3,370'. Continue drilling out shoe track to 3,430'. 600 gpm, 2,695 psi, 60 rpm, 7.6k TO, PU - 120k, SO - 75k, RT - 93k. Continue drilling cement, shoe, and rathole from 3,430' to 3,470. 600 gpm, 2,395 psi, 60 rpm, 5.7k TO. Started displacing hole 5' prior to drilling out shoe. Drill new 9 7/8" hole from 3,470' to 3,490' with same parameters. Printed: 9/5/2006 2:49:57 PM BP Page 5 ~f 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours ~ Task Code NPT Phase Description of Operations - --- 7/21/2006 100:30 - 01:30 I 1.001 DRILL I P 01:30 - 02:00 I 0.501 DRILL I P 02:00 - 02:30 I 0.501 DRILL I P 02:30 - 12:00 9.501 DRILL I P 12:00 - 21:00 9.00 DRILL P 21:00 - 21:30 I 0.501 DRILL I P 21:30 - 00:00 ~ 2.501 DRILL P 7/22/2006 100:00 - 01:00 1.00 ~ DRILL P 01:00 - 04:00 I 3.001 DRILL I P 04:00 - 04:30 ~ 0.501 DRILL P 04:30 - 05:00 0.50 DRILL P 05:00 - 07:30 2.50 DRILL P 07:30 - 09:30 2.00 DRILL P INT1 Continue displacing well from 9.5 ppg spud mud to 8.8 ppg LSND mud C~ 250 gpm, 460 psi. Only able to get 1 empty Vac truck for job and offload from mud pits @ 6 bpm. INT1 Perform LOT. MD - 3,457', TVD - 2,778', MW 8.8 ppg, Leak off pressure - 610 psi, EMW - 13.02 ppg INT1 Perform benchmark ECD's and slow pump rates. CECD - 9.24 PPg• INT1 Directionally drill from 3,490' to 5,690'. 700 gpm, 2,660 psi on, 2,450 psi off, 80 rpm, 7.4k TO on, 7k TO off, PU - 140k, SO - 85k, RT - 107k, WOB - 25k. AST - .56 hrs, ART - 4.67 hrs. CECD - 9.69 ppg, AECD - 9.92 ppg. Pumped 30 bbls high vis sweep ~ 4,100' with no increase in cuttings with bottoms up. Pumped 35 bbls high vis, 1.5 ppg over, weighted sweep ~ 5,670' with same results. INT1 Directionally drill from 5,690' to TD ~ 6,680' MD, 4,632' TVD. 700 gpm, 3,260 psi on, 3,160 psi off, 80 rpm, 9.2k TO on, 7.2k TO off, PU - 146k, SO - 88k, RT - 115k, WOB - 20k. AST - 4.15 hrs, ART - 1.55 hrs. CECD - 9.79 ppg, AECD 9.90 ppg. Pumped 38 bbls high vis, 1.5 ppg over, weighted sweep ~ 6,646' INTi INT1 INT1 INT1 INT1 INTi INT1 INT1 09:30 - 10:00 0.50 DRILL P INT1 10:00 - 12:00 2.00 EVAL P INTi 12:00 - 13:00 1.00 EVAL P INT1 13:00 - 16:30 3.50 EVAL N SFAL INTi 16:30 - 19:30 I 3.00 I EVAL I N I SFAL I INT1 19:30 - 21:00 I 1.501 EVAL I N I SFAL I INT1 'Preliminary Formation Tops OA ~ 5,935' MD, 4,371' TVD OBa ~ 6,070' MD, 4,444' TVD OBb ~ 6,165' MD, 4,489' TVD OBc @ 6,318' MD, 4,551' TVD OBd ~ 6,506' MD, 4,605' TVD Finish pumping sweep out of hole. No increase in cuttings with bottoms up. Take final survey. MadPass log from 6,680' to 6,069' (bit depth) ~ 600 fph. 700 gpm, 2,990 psi, 80 rpm, 6.8k TO. No problems. No mud losses. Continue Mad Pass log from 6,069' to 5,650' (bit depth) ~ 600 fph. 700 gpm, 2,900 psi, 80 rpm, 5k TO. No problems. Backream to shoe from 5,650' to 3,457' ~ 1,800 fph. 700 gpm, 2,300 psi, 80 rpm, 4.6k TO. No problems. Circulate bottoms up while rotating out 3 stands to 3,127'. 700 gpm 2,200 psi, 80 rpm, 4.5k TO. 30% increase in cuttings (clay balls) on bottoms up. Circulate shakers clean. Service topdrive, drawworks, and crown. POH for MDT logs from 3,127' to 164'. PJSM. Laydown nuclear source. Laydown remainder of BHA #3. Clear and clean rig floor. Rig up Schlumberger Wireline for MDT logs. Surface test logging tools. Tests failed. Expedite tool from Deadhorse. Rig down tools to trouble shoot packer assembly. Change out packer and test same - OK. Make up tools and surface test logging assembly -Test failed. Continue trouble shoot logging tools. Narrowed failure down to 2 different tools. Unable to repair on location. Rig down SLB to send tools to SLB shop. Clear floor. Printed: 9/5/2006 2:49:57 PM r~ BP Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Start: 7/15/2006 Rig Release: 9/3/2006 Rig Number: Date ~ From - To ~ Hours Task Code NPT Phase 7/22/2006 ~ 21:00 - 22:00 1.00 EVAL N SFAL INTt 22:00 - 00:00 2.00 EVAL I N SFAL INT1 7/23/2006 100:00 - 01:00 I 1.001 EVAL I N I SFAL I INT1 01:00 - 03:30 i 2.501 EVAL I N I SFAL I INT1 03:30 - 04:15 I 0.751 EVAL I N I SFAL I INT1 04:15 - 04:45 I 0.501 EVAL I N I SFAL I INT1 04:45 - 05:00 I 0.251 EVAL I N I DPRB I INT1 05:00 - 12:30 I 7.50 I EVAL I N I STUC I INTi 12:30 - 13:00 I 0.501 EVAL I N I DPRB I INT1 13:00 - 14:00 I 1.00 I EVAL I N I SFAL I INT1 14:00 - 14:30 I 0.501 EVAL I N I SFAL I INT1 Page6of31 Spud Date: 7/16/2006 End: 9/3/2006 Description of Operations Prepare to pick up dumb iron cleanout assembly. Bring bit and NBSTAB to floor. Load pipe shed with 5" HWDP. Make up cleanout assembly (BHA #4). 9 7/8" RR bit (from BHA #3), NBSTAB, 4 joints 5" HWDP, Jar, 4 joints 5" HWDP, XO, 24 joints 4" HWDP. Run in hole to 3,409' with cleanout assembly due to SLB MDT tool failure. `Received call from SLB WL supervisor Bob Templeton ~ 12:15 hr to notify us that no progress had been made on trouble shooting the logging tools. They have Houston SLB techs helping trouble shoot. Fill pipe and circulate a bottoms up C~? 336 gpm, 580 psi, 40 rpm, 2.2k TO. Circulate another bottoms up ~ 710 gpm, 2,050 psi, 120 rpm, 2.1 k TO. Did not return any increase in cuttings on bottoms up. Slow pump rate to 113 gpm, 100 psi while waiting on SLB. '02:25 hr, called SLB on progress -making progress. `02:45 hr, SLB called on progress -not sure, but maybe -doing some final tests. '03:20 hr, SLB called on progress -tool good to go. Found broken component in the pump out tool. Run in hole from 3,409' to ~ 5,400' without problems. Set down ~ 5,400'. Attempt to work down without pump with no success. Make up topdrive, fill pipe and establish circulation with 200 gpm, 400 psi. Fell through immediately while pumping and no rotation. Wipe through several times with and without pump and no indication of drag. Continue running in hole from 5,400 to 5,945' with no pumps of rotation. Washed by from 5,945' to 5,990'. RIH from 5990 to 6,118' with no pumps or rotation. Set down ~ 6,118'. Attempt to work down with pump without success ~ 200 gpm, 425 psi. Rotate and fall through tight spot ~ 6,118' and wash stand down to 6,182', 30 rpm, 1.8k TO, PU - 135k, SO - 80k, RT - 100k. Backream up to tight spot @ 6,118' and stuck pipe. Not able to go down or up. Full circulation. SLB tools back on location ~ 05:00 hrs. Work stuck pipe ~ 6,118'. Attempt to torque and slump drill pipe down with different pump rates from 200 gpm to 400 gpm without success. Had full circulation without any packoff indications. Jar down on pipe with and without pumps with good jar action. Pump rates varied from no pump up to 600 gpm, 2,100 psi. Tried various torques and slump. Pipe came free from jarring down without torque. Wash stand down to 6,183' then backream from 6,183' to 6,087' C~ 600 gpm, 2,060 psi, 100 rpm, 4k TO. Tight area cleaned out. Continue running hole from 6,087' to 6,565' with and without pumps, washing through minor tight spots as needed. Precautionary wash to bottom from 6,565' to 6,680'. Circulate bottoms up ~ 600 gpm, 2,130 psi, 120 rpm, 4k TO. Printed: 9/5/2006 2:49:57 PM BP Operations Summary Report Page 7 of 31 Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code i NPT Phase Description of Operations 7/23/2006 14:00 - 14:30 0.50 EVAL N SFAL INT1 14:30 - 15:30 1.00 EVAL N SFAL INT1 7/24/2006 15:30 - 18:00 18:00 - 19:30 19:30 - 20:30 20:30 - 21:00 21:00 - 00:00 00:00 - 01:00 01:00 - 01:30 01:30 - 06:30 2.50 EVAL N 1.50 EVAL N 1.00 EVAL N 0.50 EVAL N 3.00 EVAL N 1.00 EVAL N 0.50 EVAL P 5.00 EVAL P SFAL INT1 SFAL INT1 SFAL INT1 SFAL INT1 SFAL INT1 SFAL INT1 INT1 INT1 06:30 - 08:30 2.00 EVAL P INT1 08:30 - 11:00 2.50 EVAL N SFAL INT1 11:00 - 22:30 11.50 EVAL P INT1 22:30 - 00:00 00:00 - 22:00 1.50 EVAL P 22.00 EVAL P INTi INT1 22:00 - 00:00 7/26/2006 00:00 - 05:00 2.00 EVAL P 5.00 EVAL P INT1 INT1 05:00 - 06:00 .1.00 EVAL P INTi 06:00 - 07:30 1.50 EVAL P INT1 07:30 - 09:00 1.50 EVAL P INT1 09:00 - 11:00 2.00 EVAL P INT1 11:00 - 12:30 1.50 EVAL P INT1 12:30 - 15:30 3.001 EVAL P INT1 Very little cuttings back during circulation. Circulate and pump a high vis, weighted sweep ~ 1.5 ppg over. 650 gpm, 2,450 psi. No increase in cuttings with sweep back to surface. MW - 9.1+ppg. Monitor well - OK. POH from 6,680' to 3,409'. Worked and re-wiped through minor tight spots C~ 5,968', 5,660', and 5,400'. Monitor well ~ shoe - OK. Continue POH from 3,409' to 1,021'. Stand back 4" and 5" HWDP. Break bit, leave NBSTAB on HWDP for next cleanout run. Clear and clean rig floor. PJSM with SLB W L. Rig up and start surface testing MDT logging tools. Continue making up and test MDT logging tools. Rig up wireline sheave in derrick. Run in hole with MDT logging tools on drill pipe to 5,131' tool depth. Circulated stands down per SLB ~ 1,752', 3,376', 3,748', 4,116', 4,591', 4,974'. 167 gpm, 75-200 psi. Pick up and make up side door entry sub. Rig up lower sheave, pump down and latch up to logging tools. 210 gpm, 400 psi. Check tools. MDT pressure sampler would not function. Made software adjustment to get around problem. Run in hole taking MDT pressure samples from 5,342' to 6,586'. Total of 29 out of 34 tests good pressure samples taken. POH from 6,586 to 5,956' ~ 1,200 fph for fluid sample tests Take MDT fluid samples with 5 out of 8 recovered #1 - 5,956' - OA -good #2 - 6,324' - OBc -good #3 - 6,089' - OBa -failed #4 - 6,196' - OBb -good #5 - 6,124' - OBa -good #6 - 6,586' - OBd -good #7 - 5,453' - M62 -failed #8 - 5,473' - MB2 -failed PJSM. Pull wire to 200' below the surface and RD the side door entry sub. POH from 5,172' standing back 4" DP and HWDP to surface, MW in - 9.1 ppg, MW out - 9.1 ppg. Breakout and LD MDT tools. MU cleanout BHA #2: 9-7/8" DS 147, stab, 4 jts of 5" HWDP, jars, 4 jts of 5" HWDP, 8 stds of 4" HWDP. RIH with cleanout BHA#2 on 4" DP from 1,022' to 3,409'. Cut and slip 71' of drilling line. Service the top drive and crown. Clean under the drawworks. RIH from 3,409' to 6,680'. Worked tight spots at 6,196' and 6,340' without pumps. Stage up the pumps to 560 gpm, 2,050 psi, 130 rpm and circulate a bottoms up. Pump a 35 bbl 10.6 ppg sweep from surface to surface at 660 gpm, 2,680 psi, 130 rpm. MW in - 9.1 ppg, MW out - 9.1 ppg. Monitor the well -stable. POH from 6,680' standing back the Printed: 9/5/2006 2:49:57 PM BP Page 8 of 31 Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date ;From - To l_ - - --- 7/26/2006 12:30 - 15:30 15:30 - 18:30 18:30 - 19:00 19:00 - 21:00 21:00 - 00:00 7/27/2006 00:00 - 04:30 04:30 - 05:00 05:00 - 08:30 08:30 - 09:00 09:00 - 15:30 15:30 - 16:00 L-204 L-204 Spud Date: 7/16/2006 DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 NABOBS 9ES Rig Number: ;Hours Task Code j NPT Phase Description of Operations 3.00 EVAL P INT1 4" DP and 4" HWDP - PU - 133k, SO - 93k. 3.00 EVAL P INT1 LD Cleanout BHA#2 from the top of the 5" HWDP. Clear and clean the rig floor. 0.50 BOPSU P INT1 Pull the wear ring. Jet and drain the BOP stack. 2.00 BOPSU P INT1 Changeout the upper pipe rams from 3-1/2" x 6" variables to 7-5/8" rams. Test the door seals to 250 psi / 3,500 psi -good. RD testing equipment and make a dummy run with the 7-5/8" casing hanger. 3.00 CASE P INT1 RU to run 7-5/8" 29.7# L-80 BTC-m /TCII casing. 4.50 CASE P INT1 PU and RIH with 7-5/8" 29.7# L-80 BTC-m shoe track and check floats -holding. Continue PU and RIH with 7-5/8" 29.7# L-80 BTC-m casing to 1,958', utilizing BOL 2000 NM thread lubricant and torqued to the mark with 10.5k ftlbs. Filled every joint with the fillup tool and broke circulation for 5 minutes every 10 joints while running in the hole. 0.50 CASE P INT1 RU the rig floor to run 7-5/8" TCII casing. 3.50 CASE P INT1 Crossover and RIH with 7-5/8" 29.7# L-80 TCII to 3,441' - torque turning each connection with 10k ftlbs and utilizing Jet Lube Seal Guard thread lubricant. Filled every joint with the fillup tool and broke circulation for 5 minutes every 10 joints while running in the hole. 0.50 CASE P INT1 Circulate a bottoms up at 3,441' prior to going into the open hole with the casing - 300 gpm, 420 psi, PU - 135k, SO - 100k. 6.50 CASE P INT1 Continue PU and RIH with 7-5/8" 29.7# L-80 TCII to 6,642' - torque turning each connection with 10k ftlbs and utilizing Jet Lube Seal Guard thread lubricant. Filled every joint with the fillup tool and broke circulation every 5 joints RIH and circulated for 10 minutes every 15 joints while running in the hole. Washed the last joint down to 6,642'. 0.50 CASE P INTi MU the casing hanger and landing joint. Land the hanger on the ring with the shoe at 6,670'. LD the fillup tool and RU the cement head, PU - 225k, SO - 107k. Ran total of: 46 jts (includes 4 RA marker joints) 7 5/8" 29.7# L-80 BTC-M casing, 119 jts 7 5/8" 29.7# L-80 TCII casing 1 X-over jt 7 5/8" TCII box XBTC-M pin 2 ea. 10' BTC-M pup joints 3 ea. 20 'BTC-M pup joints 81 straight 7-3/4" x 9-5/8" x 8" centralizers 40 stop rings 16:00 - 17:00 17:00 - 19:30 Shoe ~ 6,670' RA tag ~ 6,381' OBb RA tag ~ 6,115' OBa RA tag @ 6,015' OA RA tag @ 5,881' 1.00 CEMT P INT1 Circulate and condition the mud for the cement job while staging the pumps up to 300 gpm, 530 psi. Hold PJSM with Schlumberger while circulating and begin batching up the cement. 2.50 CEMT P INT1 Land the hanger on the ring and line up to Schlumberger. Drop Printed: 9/5/2006 2:49:57 PM • BP Operations Summary Report Page 9 of 31 Legal Well Common W Event Nam Contractor Rig Name: Date Name: L ell Name: L e: Name: From - To -204 -204 DRILL+C NABOB NABOB Hours OMPLE S ALASK S 9ES Task TE A DRI Code LING NPT Start I Rig Rig Phase Spud Date: 7/16/2006 : 7/15/2006 End: 9/3/2006 Release: 9/3/2006 Number: Description of Operations 7/27/2006 17:00 - 19:30 2.50 CEMT P INT1 bottom plug. Pump 5 bbls H2O. Shut down. Pressure test surface cementing lines to 3,500 psi - OK. Pump 20 bbls CW-100 followed by 50 bbls 10.5 ppg MudPush Spacer. Chase the spacer with 58 bbls 15.8 ppg "G" Durablend batched mixed lead cement ~ 5 bpm, 350 psi. Switch tanks and pump 58 bbls 16.3 ppg "G" Durastone batched mixed tail cement ~ 6 bpm, 300 psi. Shut down, drop top plug and kick out with 5 bbls H2O. Shut down, switch to rig pumps and pump 298 bbls of seawater C~2 ICP - 7 bpm, 150 psi, FCP - 7 bpm, 1,100 psi. Slow pumps down to 3 bpm, 1,025 psi. Bump plug with calculated displacement of 298 bbls ~ 96% with 1,600 psi. Bleed pressure off. Check floats - OK. Bumped plug ~ 1920 7/27/2006. Had full returns throughout job. Stopped pipe reciprocation with 275 bbls of seawater away. 19:30 - 00:00 4.50 CASE P INT1 RD the cement head and the landing joint. Install packoff and run in the lock down screws - 450 ftlbs. Pressure test to 5,000 psi and hold for 10 minutes -good. LD the fillup tool and clear the floor of the cement head, elevators and the long bales. Changeout to the short bales and elevators. 7/28/2006 00:00 - 03:00 3.00 BOPSU P INT1 Flush the stack and install the test plug. Changeout the upper rams from 7-5/8" to 3-1/2" x 6" variables. RU testing equipment and test to 250 psi / 3,500 psi -good. RD testing equipment. Install wear ring. 03:00 - 04:00 1.00 DRILL P PROD1 Bring BHA components to the rig floor. 04:00 - 04:30 0.50 DRILL P PROD1 04:30 - 09:00 4.50 DRILL P PROD1 09:00 - 12:00 3.00 DRILL P PROD1 12:00 - 13:00 1.00 DRILL N WAIT PROD1 13:00 - 13:30 0.50 DRILL P PROD1 13:30 - 14:00 0.50 DRILL P PROD1 14:00 - 18:00 4.00 DRILL P PROD1 18:00 - 18:30 0.50 DRILL P PROD1 18:30 - 20:00 1.50 DRILL P PROD1 20:00 - 20:30 0.50 DRILL P PROD1 20:30 - 21:30 1.00 CASE P PROD1 Simops: Cement compressive strength > 500 psi. Perform LOT down the 10-3/4" x 7-5/8" OA with 9.1 ppg mud, 550 psi, 2,778' TVD - 12.9 ppg EMW. Inject 110 bbls of 9.1 ppg LSND fluid down the OA to ensure clear - 3 bpm, 850 psi. Freeze protect OA with 103 bbls dead crude. Simops: Clean pits for MOBM PU 6 jts of 4" HT40 DP and stand back 2 stands in the derrick. Continue Simops operations PJSM. MU BHA#6 and RIH. Continue Simops operations. BHA#6: 6-3/4" Hycalog DS146h+gjuw RR w/ 3 x 9's and 3 x 10's, 4-3/4" AIM motor 4R/5S 6 stg, bypass sub w/float, nm stab, MWD/LWD, PWD, ADN, 2 x nm flex dc's, circ sub, xo, 1 jst 4" DP, jars RIH with BHA#6 picking up single joints of 4" HT40 DP from the pipe shed. Shut down due to crew change and Nordic 3 in the road. Continue RIH with BHA#6 picking up single joints of 4" HT40 DP from the pipe shed. Shallow test the MWD tools -good, 320 gpm, 1,190 psi Continue RIH with BHA#6 picking up single joints of 4" HT40 DP from the pipe shed. RIH with 8 stands of 4" HWDP from the derrick. Continue RIH with BHA#6 picking up single joints of 4" HT40 DP from the pipe shed. Service and lubricate the rig and the top drive. RU and pressure test the 7-5/8" casing to 3,500 psi. Chart and Printed: 9/5/2006 2:49:57 PM gp Page 10 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date !From - To Hours Task Code NPT Phase 7/28/2006 20:30 - 21:30 1.00 CASE P PROD1 21:30 - 23:00 1.50 DRILL P PROD1 23:00 - 23:45 0.75 DRILL P PROD1 23:45 - 00:00 0.25 DRILL P PROD1 7/29/2006 00:00 - 00:30 0.50 DRILL P PROD1 00:30 - 01:30 I 1.001 DRILL I P 01:30 - 01:45 I 0.251 DRILL I P 01:45 - 02:00 I 0.251 DRILL I P 02:00 - 03:00 I 1.001 DRILL I P 03:00 - 12:00 I 9.001 DRILL I P 12:00 - 00:00 I 12.001 DRILL I P 7/30/2006 100:00 - 12:00 12.001 DRILL ~ P 12:00 - 19:30 I 7.501 DRILL I P 19:30 - 20:30 I 1.001 DRILL I P 20:30 - 00:00 I 3.501 DRILL I P 7/31/2006 100:00 - 13:00 13.001 DRILL I P 13:00 - 14:30 I 1.501 DRILL I P 14:30 - 00:00 I 9.501 DRILL I P PROD1 PROD1 PRODt PROD1 PROD1 PROD1 PROD1 PROD1 Description of Operations hold for 30 minutes -good test. RD and blowdown lines. Wash down and tag the 7-5/8" float collar on depth at 6,586'. Drill shoe track to 6,668', 250 gpm, 1,190 psi, 40 rpm, 7 k TO, PU - 150k, SO - 85k, ROT - 115k. Circulate the hole clean prior to swapping out to MOBM. Clean out the pill pit and prepare for fluid swap to MOBM. Continue to clean out the pill pit and prepare for fluid swap to MOBM. Displace the well over from seawater to 9.2 ppg MOBM drilling fluid. Drill out the 7-5/8" float shoe, rat hole and 28' of new formation to 6,708'. Circulate to get the cuttings up the hole and position the bit inside the 7-5/8" casing. Perform an FIT to 11.5 ppg EMW with 9.2 ppg MOBM drilling fluid and 560 psi surface pressure at 4,632' ND. Correlate logs from intermediate hole to production hole, take baseline ECD's and SPR's. Drill 6-3/4" hole ahead directionally from 6,708' to 7,568', PU - 140k, SO - 75k, ROT - 108k, 306 gpm, 2,645 psi off, 2,825 psi on, 60 rpm, 5.2 k TO off, 6.5k TO on, AST - 1.88, ART - 2.42, CECD - 9.97 ppg, AECD - 10.54 ppg. Take surveys every 30'. Drill 6-3/4" hole ahead directionally from 7,568' to 8,713', PU - 145k, SO - 75k, ROT - 105k, 306 gpm, 2,790 psi off, 2,890 psi on, 60 rpm, 6 k TO off, 7k TO on, AST - 2.37, ART - 2.93, CECD - 10.01 ppg, AECD - 10.59 ppg. Take surveys every 30'. Drill 6-3/4" hole ahead directionally from 8,713' to 9,965', PU - 155k, SO - 65k, ROT - 105k, 306 gpm, 2,820 psi off, 3,115 psi on, 60 rpm, 6.8k TO off, 9.1 k TO on, CECD - 10.00 ppg, AECD - 10.54 ppg, AST - 1.88, ART - 2.77. Take surreys every 30'. Drill 6-3/4" hole ahead directionally from 9,965' to 10,753', PU - 155k, SO - 75k, ROT - 105k, 306 gpm, 2,990 psi off, 3,100 psi on, 60 rpm, 8k TO off, 9k TO on, CECD - 10.00 ppg, AECD - 10.67 ppg. Take surveys every 30'. AECD climbed to 10.81 PPg• Pumped a 10.8 ppg sweep around at 10,339' with no increase in cuttings across the shakers. PROD1 Circulate for ECD management - 306 gpm, 2,990 psi. CECD - 10.00 ppg. AECD initial - 10.81 ppg, AECD final - 10.67 ppg. PROD1 Drill 6-3/4" hole ahead directionally from 10,753' to 10,913', PU - 155k, SO - 75k, ROT - 105k, 306 gpm, 2,990 psi off, 3,100 psi on, 60 rpm, 8k TO off, 9k TO on, CECD - 10.01 ppg, AECD - 10.76 ppg, AST - 1.52, ART - 4.67. Take surveys every 30'. PROD1 Drill 6-3/4" hole ahead directionally from 10,913' to 11,965' (TD), PU - 155k, SO - 60k, ROT - 105k, 306 gpm, 3,050 psi off, 3,200 psi on, 60 rpm, 8k TO off, 9k TO on, CECD - 10.32 ppg, AECD - 10.90 ppg, AST - 4.38, ART - 2.88. Take surveys every 30'. PROD1 Circulate the well - 310 gpm, 3,225 psi, CECD - 10.32 ppg, AECD - 10.87 ppg. PROD1 MAD pass / Backream from 11,965' to 9,287' at <600'/hr - 313 gpm, 2,860 psi, 60 rpm, 6k TO, ROT - 110k, CECD - 10.32 Printed: 9/5/2006 2:49:57 PM gP Page 11 of 31 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: ell Name: e: Name: From - To ~ L-204 L-204 DRILL+C NABOR NABOR Hours j OMPLE S ALASK S 9ES Task ~ TE A DRI Code LING NPT Start I Rig Rig Phase Spud Date: 7/16/2006 : 7/15/2006 End: 9/3/2006 Release: 9/3/2006 Number: Description of Operations 7/31/2006 14:30 - 00:00 9.50 DRILL P PROD1 ppg, AECD - 10.4 ppg. 8/1/2006 00:00 - 10:30 10.50 DRILL P PROD1 MAD pass / Backream from 9,287' to 7,200' at <600'/hr, slow BR rate to <100'/hr from 7,200' to 7,000' and then bring rate up to <600'/hr from 7,000 to 6,680'/hr - 313 gpm, 2,435 psi, 60 rpm, 6k TO, ROT - 106k. 10:30 - 11:00 0.50 DRILL P PROD1 Monitor the well at the shoe -stable. POH to 5,840'. 11:00 - 13:00 2.00 DRILL P PROD1 Service and lubricate the rig and top drive. Slip and cut 64' of drilling line 13:00 - 14:30 1.50 DRILL P PROD1 RIH from 5,840' to 6,517' and log the RA tags in the 7-5/8" casing for verification at <200'/hr, 313 gpm, 2,300 psi - 5,881', 6,015', 6,115', 6,380'. 14:30 - 18:00 3.50 DRILL P PROD1 RIH from 6,517' to 11,965'. Precautionary wash the last stand to bottom. 18:00 - 19:30 1.50 DRILL P PROD1 Pump 15 bbls 10.7 ppg weighted sweep and displace the well over to SFMOBM - 318 gpm, 3,330 psi, 60 rpm, 7k TO, ROT - 100k. 19:30 - 23:30 4.00 DRILL P PROD1 Monitor the well -stable. MW in - 9.2 ppg, MW out - 9.2 ppg. POH standing back 4" DP from 11,965' to 6,612' without any problems, PU - 145k, SO - 75k. 23:30 - 00:00 0.50 DRILL P PROD1 Circulate a bottoms up at the shoe - 302 gpm, 2,425 psi, 60 rpm, 4k TO. 8/2/2006 00:00 - 03:00 3.00 DRILL P PROD1 Monitor the well -stable. Pump dry job. POH standing back 4" DP and 4" HW DP trom 6,612' to 234'. 03:00 - 04:30 1.50 DRILL P PROD1 PJSM. LD or stand back BHA #6 components. 6-3/4" DS146h+gjuw graded: 1-3-BT-G-X-1-CT-TD. Clear and clean the floor. 04:30 - 06:00 1.50 CASE P RUNPRD Clear and clean the floor. Change out the wear ring. RU to run 4.5" 12.6# L-80 BTC slotted and IBT solid liner. 06:00 - 12:00 6.00 CASE P RUNPRD PJSM. PU and RIH with 4.5" slotted shoe joint and 112 jts of 4.5" 12.6# L-80 BTC slotted liner, XO, 8 jts of 4.5" 12.6# L-80 IBT solid liner and four spaceout pups. Each connection utilized BOL 2000 NM thread lubricant and was torqued to the mark with 3,800 ftlbs. 12:00 - 17:00 5.00 CASE P RUNPRD Make up swell packer assembly and Aluminum Billet on GS-spear and RIH on 4" DP and HW DP to tag bottom at 11,965'. Ran a total of 122 4.5" x 5.75" x 8" rigid centralizers. 17:00 - 17:30 0.50 CASE P RUNPRD Spot the liner shoe at 11,963', PU - 170k, SO - 70k. Break circulation at 1.5 bpm, 85 psi and increase rate to 3 bpm, 1,850 psi. Slack off 10k while pumping to release the GS-spear. PU - 140k, liner is released from aluminum billet -top at 7,018'. 17:00 - 22:00 5.00 CASE P RUNPRD POH standing back 4" DP and 4" HWDP to 6,667'. Monitor the well -stable. Pump a dry job and POH. Break out and LD the GS spear. Clear and clean the floor. 22:00 - 23:00 1.00 CASE P RUNPRD Service and lubricate the top drive and the rig components. Changeout the quill. 23:00 - 00:00 1.00 BOPSU P RUNPRD Pull the wear ring and flush the BOP stack. 8/3/2006 00:00 - 04:00 4.00 BOPSU P RUNPRD RU testing equipment and test BOPE, Annular and valves to 250/3,500 psi - no failures. RD testing equipment and blowdown all surface lines. Witness of the test was waived by Chuck Schieve of the AOGCC. Witness of the test was performed by James Franks - BP and Roy Hunt - NAD. 04:00 - 06:30 2.50 DRILL P PROD2 PJSM. MU BHA#7 and RIH. Printed: 9/5/2006 2:49:57 PM BP Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date ~ From - To 8/3/2006 ~ 04:00 - 06:30 06:30 - 07:00 07:00 - 07:30 07:30 - 09:30 L-204 L-204 DRILL+COMPLETE NABOBS ALASKA DRILLING I NABOBS 9ES Start: 7/15/2006 Rig Release: 9/3/2006 Rig Number: Hours ~ Task ~ Code j NPT ~ Phase 2.50 DRILL P PROD2 0.50 DRILL P PROD2 0.50 DRILL P PROD2 2.00 DRILL P PROD2 09:30 - 11:00 1.50 DRILL P 11:00 - 12:00 1.00 DRILL P 12:00 - 14:30 2.50 DRILL P 14:30 - 00:00 9.50 DRILL P 8/4/2006 100:00 - 12:00 I 12.001 DRILL I P PROD2 PROD2 PROD2 PROD2 PROD2 12:00 - 16:30 I 4.501 DRILL I P I I PROD2 16:30 - 17:00 I 0.501 DRILL I P I I PROD2 17:00 - 00:00 I 7.001 DRILL P I PROD2 8/5/2006 100:00 - 04:30 I 4.501 DRILL I P I I PROD2 04:30 - 06:00 1.501 DRILL P I PROD2 06:00 - 12:00 I 6.001 DRILL I P I I PROD2 Page 12 of 31 Spud Date: 7/16/2006 End: 9/3/2006 Description of Operations BHA#7: 6-3/4" Hycalog DS146h+gjuw w/ 3 x 9's and 3 x t0's, 4-3/4" AIM motor 4R/5S 6 stg, bypass sub w/float, nm stab, MWD/LWD, PWD, ADN, 2 x nm flex dc's, circ sub, xo, 1 jst 4" DP, jars RIH with BHA#7 on 4" DP to 1,190'. Shallow test the MWD/LWD, 275 gpm, 1,475 psi -good. Continue RIH with 4" DP and 4" HWDP to 6,800' filling pipe every 2,500'. Log down to tie in depths and tag up on the aluminum billet on depth at 7,018' - 2502 gpm, 2,050 psi, PU - 140k, SO - 85k. POH to 6,995' and displace the well over from 9.2 ppg SFMOBM to 9.2 ppg MOBM - 252 gpm, 2,052 psi, PU - 140k, SO - 85k, ROT - 105k, 45 rpm, 6k TO. Orient and trench. KO aluminum billet fp? 7,018' and time drill to 7,024' - 306 gpm, 2,645 psi. Work pipe across the billet without problems. Drill OBd L1 6-3/4" hole ahead directionally from 7,024' to 8,046', PU - 145k, SO - 85k, ROT - 105k, 306 gpm, 2,900 psi off, 3,000 psi on, 60 rpm, 5k TO off, 6k TO on, AST - 2.55, ART - 2.55, CECD - 10.18 ppg, AECD - 10.81 ppg. Take surveys every 30'. Drill OBd L1 6-3/4" hole ahead directionally from 8,046' to 9,478', PU - 155k, SO - 75k, ROT - 109k, 306 gpm, 2,960 psi off, 3,100 psi on, 60 rpm, 7k TO off, 8k TO on, CECD - 10.18 ppg, RECD - 10.76 ppg, AST - 2.83, ART - 4.06. Take surveys every 30'. Drill OBd L1 6-3/4" hole ahead directionally from 9,478' to 10,052', PU - 163k, SO - 68k, ROT - 103k, 306 gpm, 3,100 psi off, 3,400 psi on, 60 rpm, 7k TO off, 8k TO on, CECD - 10.25 ppg, RECD - 11.05 ppg. Take surveys every 30'. Circulate and condition the mud to reduce ECD's. Pump a hi-visc sweep surface to surface with -10% additional cuttings coming across the shakers - 306 gpm, 3,100 psi. AECD initial - 11.05 ppg, AECD final - 10.79 ppg, CECD - 10.25 ppg Drill OBd L1 6-3/4" hole ahead directionally from 10,052' to 10,626', PU - 166k, SO - 65k, ROT - 104k, 306 gpm, 3,045 psi off, 3,300 psi on, 60 rpm, 7k TO off, 8k TO on, CECD - 10.28 ppg, AECD - 11.04 ppg, AST - 1.83, ART - 2.68. Take surveys every 30'. Drill OBd L1 6-3/4" hole ahead directionally from 10,626 to 11,200', PU - 166k, SO - 65k, ROT - 104k, 306 gpm, 3,100 psi off, 3,400 psi on, 60 rpm, 7k TO off, 8k TO on, CECD - 10.32 ppg, AECD - 11.04 ppg. Take surveys every 30'. CECD recalculated with recent mud properties - 10.14 ppg Circulate to reduce ECD's - 306 gpm, 3,100 psi, 60 rpm, 7k TO. AECD initial - 11.04 ppg, AECD final - 10.8 ppg, CECD - 10.16 pP9 Drill OBd L1 6-3/4" hole ahead directionally from 11,200' to 11,626', PU - 165k, SO - 70k, ROT - 103k, 306 gpm, 3,200 psi off, 3,400 psi on, 60 rpm, 7k TO off, 8k TO on, AST - 2.2, ART - 3.05, CECD - 10.41, AECD - 11.21. Take surveys every 30'. Pumped a weighted sweep around while drilling ahead ~ 11,322', -10% additional returns to surface. Printed: 9/5/2006 2:49:57 PM BP Operations Summary Report Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: L-204 L-204 DRILL+COMPLETE NABOBS ALASKA DRILLING I NABOBS 9ES Date !From - To Hours Task I Code NPT 8/5/2006 12:00 - 13:30 13:30 - 14:30 14:30 - 15:00 15:00 - 20:30 20:30 - 00:00 8/6/2006. 00:00 - 16:30 16:30 - 17:00 17:00 - 18:30 18:30 - 19:30 19:30 - 23:00 23:00 - 00:00 8/7/2006 100:00 - 00:30 1.50 DRILL P 1.00 DRILL P 0.50 DRILL P 5.50 DRILL N 3.50 DRILL P 16.50 DRILL P 0.50 DRILL P 1.50 DRILL P 1.00 DRILL P 3.50 DRILL P 1.00 DRILL P 0.501 DRILL I P 00:30 - 01:00 0.50 DRILL P 01:00 - 02:00 1.00 CASE P 02:00 - 13:00 11.00 CASE P Start: 7/15/2006 Rig Release: 9/3/2006 Rig Number: Page 13 of 31 Spud Date: 7/16/2006 End: 9/3/2006 Phase ~ Description of Operations PROD2 Drill OBd L1 6-3/4" hole ahead directionally from 11,626' to 11965' (TD), PU - 155k, SO - 56k, ROT - 99k, 306 gpm, 3,200 psi off, 3,400 psi on, 60 rpm, 7k TO off, 8k TO on, AST - 0.32, ART - 1.06, CECD - 10.44, AECD - 11.21. Take surreys every 30'. PROD2 Circulate bottoms up - 306 gpm, 3,200 psi, CECD - 10.44 ppg, AECD - 10.98 ppg, MW in - 9.2 ppg, MW out - 9.2 ppg. PROD2 Monitor the well -stable. MAD pass out of the hole from 11,965' to 11,869' at <600'/hr, 306 gpm, 3,200 psi, 60 rpm, 7k TO. RREP PROD2 The back up wrench on the top drive came in contact with the rotary table, causing damage to the pipe handling equipment and requiring change out. Change out the back up wrench on the top drive. PROD2 Resume MAD pass logging of the hole from 11,869' to 11,009' at <600'/hr, 306 gpm, 3,200 psi, 60 rpm, 7k TO. PROD2 Continue MAD pass logging of the hole from 11,009' to 7,110' at <600'/hr, 306 gpm, 2,500 psi, 60 rpm, 7k TO. MAD pass rate was reduced to <200'/hr from 9,992' to 9,842', 9,547' to 9,397' and 7,222' to 7,110' (bit depth) for caliper log and future swell packer placement. PROD2 Orient 140R and POH from 7,110' and inside the 7-5/8" casing shoe to 6,612', PU - 140k, SO - 96k. PROD2 Service the top drive, blocks and crown. Inspect the draw works and the brakes. Slip and cut 100' of drilling line. PROD2 Drop the ball and open the circ sub. Circulate a bottoms up - 416gpm, 2,100 psi. MW in - 9.2 ppg, MW out - 9.2 ppg. PROD2 Monitor the well -stable. Pump dry job and POH standing back the 4" DP and 4" HW DP to the top of the jars PROD2 PJSM for LD BHA#7 and handling nuclear source. LD the jars and circ sub. Stand back the flex collars. Remove the nuclear source. PROD2 Continue to LD BHA#7. LD the ADN, PWD, MWD/LWD, nm stab, bypass sub, motor and bit. 6-3/4" DS146h+gjuw graded: 0-1-W T-S-X-I-NO-TD PROD2 Clear and clean the rig floor. RUNPRD RU to run 4.5" 12.6# L-80 BTC slotted /IBT solid OBd L-1 liner. RUNPRD PJSM. PU 4.5" 12.6# L-80 BTC slotted /IBT solid OBd L-1 liner per running detail to 5,736'. Ran 112 joints of 4.5" 12.6# L-80 BTC slotted liner, 21 joints of 4.5" 12.6# L-80 IBT solid liner, 3 swell packer assemblies, 7-5/8 x 5-1/2" HMC hanger, 7-5/8" x 5-1/2" HRD ZXP liner top packer w/10.74' tieback, 19.07' Seal Bore Extension. All connections torqued to the mark with 3,800 ttlbs using BOL2000NM thread lubricant. 13:00 - 17:00 4.00 CASE P RUNPRD Crossover and RIH with 4.5" liner on 4" DP and 4" HWDP and tag bottom at 11,965', PU - 196k, SO - 77k. Break circulation, drop ball and pump on seat. Pressure up to 2,000 psi to set the hanger and then pressure up to 3,400 psi and release from the hanger. Bleed off perssure. PU and then SO with 40k to set the ZXP liner top packer. Repeat several times with rotation. Test the liner top packer to 2,000 psi prior to unstinging from RS packoff -good. PU out of the liner. Printed: 9/5/2006 2:49:57 PM gp Page 14 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To i Hours Task ' Code I NPT Phase '~ Description of Operations 8/7/2006 13:00 - 17:00 I 4.00 CASE P RUNPRD I 17:00 - 18:00 I 1.001 CASE I P 18:00 - 21:00 3.00 CASE P 21:00 - 22:30 1.50 STWHIP P 22:30 - 00:00 1.50 STWHIP P 8/8/2006 00:00 - 02:30 2.50 STWHIP P 02:30 - 08:30 6.00 STWHIP P 08:30 - 09:00 0.50 STWHIP P 09:00 - 09:30 0.50 STWHIP P 09:30 - 16:00 6.50 STWHIP P 16:00 - 16:30 0.50 STWHIP P 16:30 - 19:30 3.00 STWHIP P 19:30 - 20:30 1.00 STWHIP P 20:30 - 21:00 0.50 STWHIP P 21:00 - 22:30 1.50 DRILL P 22:30 - 23:00 0.50 DRILL P 23:00 - 23:30 0.50 DRILL P 23:30 - 00:00 0.50 DRILL P FloatShoe ~ 11,965' Slotted Liner ~ 9,874'to 11,923' Swell Packer f~ 9,850' to 9,860' Swell Packer (~ 9,431' to 9,441' Slotted Liner ~ 7,233' to 9,411' Swell Packer ~ 7,123'to 7,133' Slotted Liner @ 6,687' to 7,102' Seal bore extension @ 6,256' to 6,275' 7.625" x 5.5" HMC liner hanger ~ 6,250' 7.625" x 5.5" HRD ZXP liner top packer w/10.74' tieback 6,229' RUNPRD Circulate a bottoms up at 412 gpm, 2,115 psi. MW in - 9.2 PP9, MW out - 9.2 PPg• RUNPRD POH standing back the 4" DP and 4° HWDP. Break out and LD the liner running tools. Clear and clean the rig floor. WEXIT Bring the milling tools to the rig floor. PJSM. PU and stand back 9 x 4-3/4" drill collars. WEXIT PJSM. MU OBb L-2 Whipstock BHA. WEXIT Continue to MU OBb L-2 Whipstock BHA. to 1,174' -dummy seals w/ nogo shoulder, unloader jar, xo, 15' 4" HT40 pup, xo, pin x pin xo, anchor, safety disconnect, unloader jar, boot basket, ported bit sub, whipstock, window mill, lower mill, flex joint, upper mill, 1 jt 3-1/2" HWDP, float sub, MWD, bumper sub, 9 x 4-3/4" DC's, xo, 24 x 4" HWDP. Shallow test the MWD -good. WEXIT RIH with OBb L-2 Whipstock on 4" DP from 1,174' to 6,052', PU - 190k, SO - 145k WEXIT Orient 20 degrees LHS. RIH and tag the top of the L-1 liner at 6,229'. Set down 20k to set the anchor. Continue to SO to shear the pin. Top of the slide at 6,f 69', bottom of the slide at 6,182'. WEXIT Displace the well over to reconditioned 9.2 ppg MOBM - 305 gpm, 2,050 psi. WEXIT Mill window from 6,169' to 6,182' and under gauged open hole to 6,200', PU - 145k, SO - 88k, ROT - 104k, 60 rpm, 5.3k TO, 300 gpm, 2,000 psi. WEXIT Pump 50 bbl sweep and circulate the hole at 300 gpm, 2,000 psi while working the mills across the window several times. MW in - 9.2 ppg, MW out - 9.2 ppg. WEXIT Monitor the well -stable. Pump dry job and POH from 6,200'. WEXIT Stand back the 4-3/4" collars and LD the MWD and mills - in gauge. WEXIT Flush the BOP stack. PROD3 PJSM. MU BHA#9 and RIH. BHA#9: 6-3/4" Hycalog DS146h+gjuw RR w/ 3 x 9's and 3 x 10's, 4-3/4" AIM motor 4R/5S 6 stg, bypass sub w/float, nm stab, MWD/LWD, PWD, ADN, 2 x nm flex dc's, circ sub, xo, 1 jst 4" DP, jars PROD3 RIH with BHA#9 on 4" DP to 1,095'. PROD3 Shallow test the MWD -good. PROD3 RIH with BHA#9 on 4" DP to 2,147'. Printed: 9/5/2006 2:49:57 PM BP Page 15 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Date ~ From - To i Hours Task Code NPT 8/9/2006 00:00 - 02:00 2.00 DRILL P 02:00 - 03:30 1.50 DRILL P 03:30 - 04:00 0.50 DRILL P 04:00 - 12:00 8.00 DRILL P 12:00 - 18:30 I 6.501 DRILL I P 18:30 - 19:00 0.50 DRILL P 19:00 - 00:00 5.00 DRILL P 8/10/2006 100:00 - 12:00 12.00 DRILL P 12:00 - 00:00 I 12.001 DRILL I P 8/11/2006 100:00 - 02:30 I 2.501 DRILL I P 02:30 - 03:15 I 0.751 DRILL I P 03:15 - 07:00 I 3.751 DRILL I P 07:00 - 12:00 I 5.001 DRILL I P 12:00 - 00:00 12.00 DRILL P 8/12/2006 00:00 - 03:15 3.25 DRILL P 03:15 - 04:15 1.00 DRILL P 04:15 - 07:30 3.25 DRILL P 07:30 - 08:30 1.00 DRILL P 08:30 - 09:30 I 1.001 DRILL I P Spud Date: 7/16/2006 Start: 7/15/2006 End: 9/3/2006 I Rig Release: 9/3/2006 Rig Number: Phase Description of Operations PROD3 Continue RIH with 6-3/4" BHA#9 on 4" DP to 6,100'. PROD3 Slip and cut drilling line. Service the top drive, draw works and crown. PROD3 Take baseline ECD readings and Orient BHA 20 LHS. PROD3 RIH from 6,100' and past the window (6,169' - 6,182') to 6,200'. Drill 6-3/4" OBb L-2 hole ahead directionally from 6,200' to 6,900', PU - 125k, SO - 85k, ROT - 96k, 2,350 psi on, 2,250 psi off, TO on - 6.5k, TO off - 5.5k, 280 gpm, 60 rpm, AST - 2.53, ART - 0.89. CECD - 10.15 ppg, AECD - 10.59 ppg PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 6,900' to 8,130', PU - 146k, SO - 76k, ROT - 104k, 2,965 psi on, 2,645 psi off, TO on - 8.6k, TO off - 7.6k, 290 gpm, 60 rpm, CECD - 10.07 ppg, AECD - 11.01 ppg. Pumped a 30 bbl, 11.2 ppg sweep at 7,575' while drilling ahead with -25% additional cuttings coming across the shakers. PROD3 Circulate to reduce ECD's from 11.01 ppg to 10.85 ppg PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 8,130' to 8,523', PU - 146k, SO - 76k, ROT - 104k, 2,965 psi on, 2,645 psi off, TO on - 8.6k, TO off - 7.6k, 290 gpm, 60 rpm, AST - 2.2, ART - 4.34. CECD - 10.14 ppg, AECD - 10.9 ppg. Reduced the ROP to control ECD's. PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 8,523' to 9,735', PU - 150k, SO - 80k, ROT - 101 k, 2,850 psi on, 2,570 psi off, TO on - 8.6k, TO off - 7.6k, 285 gpm, 60 rpm, CECD - 10.25 ppg, AECD - 11.07 ppg, AST - 2.45, ART - 3.95. PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 9,735' to 11,201', PU - 152k, SO - 64k, ROT - 99k, 3,020 psi on, 2,740 psi off, TO on - 9.1 k, TO off - 7.8k, 290 gpm, 60 rpm, CECD - 10.34 ppg, AECD - 10.89 ppg, AST - 2.25, ART - 4.06. PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 11,201' to 11,456', PU - 152k, SO - 64k, ROT - 99k, 3,020 psi on, 2,740 psi off, TO on - 9.1 k, TO off - 7.8k, 290 gpm, 60 rpm, CECD - 10.34 ppg, AECD - 11.24 ppg. PROD3 Circulate bottoms up to reduce ECD's from 11.24 ppg to 10.84 ppg, 285 gpm, 2,900 psi, 60 rpm, 9.Ok TO. PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 11,456' to 11,910' (TD), PU - 154k, SO - 64k, ROT - 99k, 3,110 psi on, 2,760 psi off, TO on - 9.2k, TO off - 8k, 290 gpm, 60 rpm, CECD - 10.32 ppg, AECD - 11.00 ppg, AST - 0.8 ART - 1.97. PROD3 Circulate to get the cuttings away from the BHA and then MAD Pass /Backream at <600'/hr from 11,910' to 10,627', 280 gpm, 2,760 psi, 60 rpm, 7.8k TO. PROD3 Continue to MAD Pass /Backream at <600'/hr from 10,627' to 7,473', 280 gpm, 2,645 psi, 60 rpm, 7.8k TO. PROD3 Continue to MAD Pass /Backream at <600'/hr from 7,473' to 6,290', 280 gpm, 2,645 psi, 60 rpm, 7.8k TO. Pump out of the hole without rotation from 6,290' to 6,250'. Orient the tool face to 15 LHS and POH through the window to 6,135'. PROD3 Service the top drive, draw works and the crown. PROD3 RIH from 6,130'. Wash the last stand down to 11,910'. PROD3 Circulate a bottoms up - 290 gpm, 2,940 psi, CECD - 10.34 ppg, AECD - 10.48 ppg. PROD3 Displace the well over from 9.2 ppg MOBM to 9.2 ppf SF Printed: 9/5/2006 2:49:57 PM gp Page 16 of 31 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: L ell Name: e: Name: From - To -204 L-204 DRILL+C NABOB NABOB Hours i OMPLE S ALASK S 9ES Task ~ TE A DRI Code LING NPT Start I Rig Rig Phase Spud Date: 7/16/2006 : 7/15/2006 End: 9/3/2006 Release: 9/3/2006 Number: Description of Operations 8/12/2006 08:30 - 09:30 1.00 DRILL P PROD3 MOBM - 290 gpm, 3,000 psi, 60 rpm, 9k TO. 09:30 - 14:00 4.50 DRILL P PROD3 MW in - 9.2 ppg, MW out - 9.2 ppg. Monitor the well -stable. POH standing back 4" DP from 11,910' to 6,135' without problems. 14:00 - 15:00 1.00 DRILL P PROD3 PJSM. Slip. and cut drilling line. Clean underneath the draw works. 15:00 - 19:00 4.00 DRILL P PROD3 POH standing back 4" DP and 4" HWDP from 6,135' to the top of the jars on BHA#9 at 234'. 19:00 - 21:30 2.50 DRILL P PROD3 PJSM. LD jars. Stand back flex collars. Remove nuclear source and LD ADN. LD PWD, MWD, nm stab, bypass sub w/float, AIM motor and bit. Clear and clean the floor. 6-3/4" Hycalog DS 146h+gjuw graded: 0-1-WT-S-X-I-NO-TD. Note: Some damage was observed on the AIM tool. 21:30 - 00:00 2.50 WHIP P RUNPRD PJSM. MU Whipstock Retrieval BHA to 1,506' -retrieving tool, 1 jt 3.5" HWDP, bumper sub, jars, float sub, MWD, xo, 7 stand of 4" HT40 DP and 8 stands of 4" HWDP. 8/13/2006 00:00 - 02:30 2.50 WHIP P RUNPRD RIH with Whipstock Retrieval BHA on 4" DP to 6,095'. 02:30 - 03:00 0.50 WHIP P RUNPRD Orient the hook to 160 RHS and engage the slot on the whipstock face at 6,174'. Pull 50k over, fire jars and release the anchor. POH to 6,091'. Lost 8 bbls of 9.2 ppg SF MOBM once the anchor released. 03:00 - 03:30 0.50 WHIP P RUNPRD Circulate a bottoms up - 290 gpm, 1,700 psi. MW in - 9.2 ppg, MW out - 9.2 ppg. Lost 6 bbls of SF MOBM. 03:30 - 07:00 3.50 WHIP P RUNPRD Monitor the well -stable. POH with whipstock from 6,091'. Lost 18 additional bbls of 9.2 ppg SF MOBM to the hole on the trip out. 07:00 - 10:00 3.00 WHIP P RUNPRD PJSM. LD Retrieval BHA, Whipstock and all components below the whipstock. Clear and clean the floor. 10:00 - 11:30 1.50 CASE P RUNPRD RU to run 4.5" slotted liner. 11:30 - 19:30 8.00 CASE P RUNPRD PU 4.5" 12.6# L-80 solid BTC box x IBT p XO bent joint with float shoe and RIH. PU 138 joints of 4.5" 12.6# L-80 BTC slotted liner, xo, swell packer assy, 1 joint 4.5" 12.6# L-80 IBT solid, xo, hook hanger assy and running tool to 5,731'. Each connection torqued to the mark with 3,800 ft Ibs utilizing BOL2000NM thread lubricant. 19:30 - 00:00 4.50 CASE P RUNPRD RIH with 4.5" liner on a stand of DP. Screw in with the top drive and circulate to verify nothing is plugged. RIH with 4" DP and 4" DP to the window and get up and down weights, PU - 100k, SO - 75k. Exit the window on the first attempt and RIH with 4" DP and 4" HWDP to 11,824'. 8/14/2006 00:00 - 00:30 0.50 CASE P RUNPRD PU - 170k, SO - 65k. RIH from 11,824' and run past the bottom of the window -did not latch. PU and rotate the pipe. RIH past the top of the window -did not latch. Repeat. Landed the hook hanger on the 6th attempt. PU and rotate 1/2 turn. Run past the window. Rotate 1/2 turn and re-engage the window with the hookwall hanger. Float shoe, PBTMD - 11890' Swell packer - 6,256' to 6,266' Top of the Hook Hanger - 6165' 00:30 - 01:00 0.50 CASE P RUNPRD Drop ball and pump on seat. Increase pressure to 3,000 psi to release the running tool. PU to verify release, PU - 140k. Printed: 9/5/2006 2:49:57 PM BP Operations .Summary Report Legal Well Name: L-204 Common Well Name: L-204 Event Name: DRILL+COMPLETE Start: 7/15/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase - -- - 8/14/2006 101:00 - 02:30 1.50 CASE P RUNPRD 02:30 - 05:30 3.00 CASE P 05:30 - 06:30 1.00 CASE P 06:30 - 07:00 0.50 TIEBAC P 07:00 - 07:30 0.50 TIEBAC P 07:30 - 12:00 4.50 TIEBAC P 12:00 - 16:00 4.00 TIEBAC P 16:00 - 16:30 0.50 TIEBAC P 16:30 - 17:00 0.50 TIEBAC P 17:00 - 18:00 1.00 TIEBAC P 18:00 - 22:30 4.50 TIEBAC P 22:30 - 00:00 1.50 TIEBAC P 8/15/2006 ~ 001:00 - 04:30 3.50 STWH P P 04:30 - 06:00 1.50 STWHIP P 06:00 - 09:00 3.00 STWHIP P 09:00 - 09:30 09:30 - 18:00 0.501 STWHIPIP 8.501 STWHIPI P RUNPRD RUNPRD OTHCMP OTHCMP OTHCMP OTHCMP OTHCMP OTHCMP OTHCMP OTHCMP OTHCMP OTHCMP W EXIT W EXIT W EXIT W EXIT W EXIT W EXIT Page 17 of 31 Spud Date: 7/16/2006 End: 9/3/2006 Description of Operations Increase pressure to 4,300 psi and shear the ball seat. Circulate a bottoms up prior to POH. MW in - 9.2 ppg, MW out - 9.2 PPg• Monitor the well -stable. Pump SF dry job and POH from 6,159' standing back 4" DP and HWDP. Breakout and LD the Baker running tools. Clear and clean the floor. Bring LEM tools to the floor. Service the top drive. RU the rig floor to run the 4.5" LEM tieback assy. PJSM. PU Non Locating Seal Assy, 1 ea. 4.5" 12.6# L-80 XO joint, 2 x 15.09' 4.5" 12.6# L-80 IBT pup jts, LEM Hanger, 1 ea 4.5" 12.6# L-80 IBT-M pup jt, Casing Swivel, 5-1/2" HYD 563 x 4-1/2" IBT XO Bushing, Baker 190-47 Seal Bore Extension, Baker HRD ZXP Liner Top Packer and RIH with 2/3/8" inner work string. RIH with LEM#1 on 4" DP and 4" HWDP to 6,130 Wash down from 6,130' and enter the Seal Bore Extension of L-1 at 6,256' - 2 bpm, 386 psi. Tag up on depth and set down 30k to ensure locked. PU 15k overpull and ensure locked. Set back down 30k. Seals @ 6264' Top of LEM @ 6,108' Drop 1.75" ball and pump on seat - 3 bpm, 600 psi. Once seated, increased pressure to 3,000 psi to set the packer. Set down 70k and increase pressure to 4,200 psi to release from the LEM. Bleed off pressure and PU with 125k. Close the annular and test the backside to 1,500 psi -good. Stand back 3 stands of 4" DP to clear the inner string from the LEM. Circulate a bottoms up, MW in - 9.2 ppg, MW out - 9.2 ppg. Monitor the well -stable. Pump SF dry job. POH to the top of the running tools standing back the 4" DP and 4" HWDP. Break out and LD the running tool and the inner string components. Clear and clean rig floor. Lay down LEM tools off rig floor. Pick up whipstock assembly to rig floor Make up dummy seal assembly, NO GO, unloader, double pin sub, anchor, safety disconnect unloader, debris sub, bit sub, ported sub whipstock, window mill, lower string mill, flex joint, ,upper mill, 1 joint HWDP, float sub, MWD, and bumper sub. Pick up 3 stands of 4 3/4" drill collars, cross-over, and 7 stands 4" drill pipe to 1,087' Shallow hole test MWD - OK. Pick up 8 stands HWDP and continue running in hole from 1,087' to 6.032'. Orient whipstock 7 deg left of high side. PU - 130k, SO - 85k. Tag upon L2 Tie Back ~ 6,108. Anchor set with 13k down weight. Pick up to 140k to verify anchor set. Shear mills with 23k down weight. Pick up to open jars. Whipstock set for top of window f~ 6.064', bottom of window ~ 6,076'. Start displacement from 9.2 ppg SFMOBM to 9.2 ppg MOBM. Obtain slow pump rates and mill OBa window from 6,064' to 6,076'. Continue milling with window mill to 6,097' placing full Printed: 9/5/2006 2:49:57 PM BP Operations Summary Report Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: L-204 L-204 DRILL+COMPLETE NABOBS ALASKA DRILLING I NABOBS 9ES Date From - To Hours Task Code ~ NPT i 8/17/2006 112:00 - 00:00 I 12.001 DRILL I P 8/18/2006 100:00 - 12:00 I 12.00 DRILL I P 12:00 - 16:00 I 4.001 DRILL I P 16:00 - 17:00 I 1.001 DRILL I P 17:00 - 00:00 I 7.001 DRILL I P 8/19/2006 100:00 - 13:00 I 13.001 DRILL I P 13:00 - 13:30 0.50 DRILL P 13:30 - 16:30 3.00 DRILL P 16:30 - 18:00 I 1.501 DRILL I P 18:00 - 19:30 ~ 1.501 DRILL I P 19:30 - 00:00 I 4.501 DRILL I P 8/20/2006 100:00 - 02:00 I 2.001 DRILL I P 02:00 - 03:30 I 1.501 DRILL I P 03:30 - 04:00 0.50 DRILL P 04:00 - 04:30 0.50 WHIP P 04:30 - 07:30 I 3.001 WHIP I P Start: 7/15/2006 Rig Release: 9/3/2006 Rig Number: Page 19 of 31 Spud Date: 7/16/2006 End: 9/3/2006 Phase i Description of Operations PROD4 10.51 ppg, AECD - 11.31 ppg. AST - 1.85 hrs, ART - 3.19 hrs. Survey every 30', backream each stand 60' prior to connections. Pumped 2 Ib over, 35 bbl, weighted sweep @ 9,395' which returned no increase in cuttings to surface. PROD4 Directionally drill OBa L3 lateral from 9,766' to 11,296'. 285 gpm, 3,055 psi off, 3,100 psi on, 60 rpm, 9.6k TO off, 10.1 k TO on. PU - 165k, SO - 60k, RT - 99k, WOB - 5-10k. CECD - 10.61 ppg, AECD - 11.27 ppg, ART - 2.76 hrs, AST - 2.21 hrs. Survey every 30', backream each stand 60' prior to connections. PROD4 Directionally drill OBa L3 lateral from 9,766' to TD ~ 11,296' MD, 4,623' TVD. 285 gpm, 3,070 psi off, 3,210 psi on, 60 rpm, 9.1 k TO off, 9.4k TO on. PU - 175k, SO - 50k, RT - 102k, WOB - 10k. CECD - 10.67 ppg, AECD - 11.67 ppg, ART - 1.22 hrs, AST - .55 hrs. Survey every 30', backream each stand 60' prior to connections. Pumped 30 bbl 2 Ib over sweep ~ 11,785'. PROD4 Finish clearing sweep from annulus with 5% increase in cuttings back to surface. 285 gpm, 3,080 psi, 60 rpm, 9.1 k TO. Circulated until AECD's were less than .8 ppg. Monitor well - OK. MW - 9.2 PP9• PROD4 MadPass log from 11,985' to 10,110' ~ 600 fph. MadPass log from 10,110' to 10,053' ~ 200 fph. 285 gpm, 3,067 psi, 60 rpm, 9.5k TO, CECD - 10.67 ppg, AECD - 11.42 ppg. PROD4 MadPass log from 10,053' to 9,870' ~ 200 fph. MadPass log from 9,870' to 6,610' @ 600 fph. MadPass log from 6,610' to 6,490' ~ 200 fph. MadPass log from 6,490' to 6,290' @ 600 fph. MadPass log from 6,290 to 6,185 ~ 200 fph. Orient high side and pull into 7 5/8" casing to 5,922'. 285 gpm, 2,680 psi, 60 rpm, 7.4k TO, CECD - 10.49 ppg, AECD - 10.56 ppg. PU - 130k, SO - 85k. PROD4 Service topdrive and crown. PROD4 Run in hole from 5,972' to 11,870' without problem. Precautionary wash from 11,870' to 11,925' PROD4 Circulate bottoms up. 290 gpm, 2,990 psi, 60 rpm, 7.3k TO. CECD - 10.67 ppg, AECD - 10.47 ppg. Prepare mud pits for SFMOBM. PROD4 Displace hole from 9.2 ppg MOBM to 9.2 ppg, 77 vis SFMOBM. 290 gpm, 3,010 psi, 60 rpm, 10k TQ, 106k RWT. CECD - 10.67 ppg, RECD - 10.67 ppg. Monitor well - OK. PROD4 Pump dry job and POH from 11,925' to 5,590' without problem. PU - 175k, SO - 77k. Pumped second dry job C~3 5,972'. PROD4 Continue POH with drilling assembly (BHA #12) from 5,590' to 234'. PROD4 PJSM. LD jars. Stand back flex collars. Remove nuclear source and LD ADN. LD PWD, MWD, nm stab, bypass sub w/float, AIM motor and bit. 6-3/4" Hycalog DS 146h+gjuw graded: 0-1-W T-S-X-I-NO-TD. PROD4 Clear and clean rig floor. RUNPRD PJSM. MU Whipstock Retrieval BHA to 1,506' -retrieving tool, 1 jt 3.5" HWDP, bumper sub, jars, float sub, MWD, xo. Orient MWD 180 deg from retrieval hook. RUNPRD Run in hole 7 stands of 4" HT40 DP and 8 stands of 4" HWDP Printed: 9/5/2006 2:49:57 PM BP Operations Summary Report Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: Date I From - To L-204 L-204 DRILL+COMPLETE NABOBS ALASKA DRILLING I NABOBS 9ES Hours ~ Task Code NPT Page 20 of 31 Spud Date: 7/16/2006 Start: 7/15/2006 End: 9/3/2006 Rig Release: 9/3/2006 Rig Number: Phase Description of Operations 8/20/2006 04:30 - 07:30 3.00 WHIP P RUNPRD 07:30 - 08:00 0.50 WHIP P RUNPRD 08:00 - 09:00 I 1.001 WHIP I P I I RUNPRD 09:00 - 13:30 I 4.501 WHIP I P I I RUNPRD 13:30 - 14:30 1.001 WHIP P RUNPRD 14:30 - 15:00 0.50 WHIP P RUNPRD 15:00 - 16:00 1.00 CASE P RUNPRD 16:00 - 00:00 8.00 CASE P RUNPRD 8/21/2006 100:00 - 02:00 I 2.001 CASE I P I I RUNPRD 02:00 - 06:00 4.001 CASE P RUNPRD 06:00 - 07:30 I 1.501 CASE I P I I RUNPRD then back to drill pipe from 98' to 5,960'. Shallow hole tested MWD ~ 1,136' - OK. Break circulation every 1,000'. Orient hook highside. PU - 135k, SO - 90k. Latched up on first attempt ~ 6,069'. Picked up to 205k to verify latch without releasing anchor. Picked up and jar twice with 215k up. Anchor released on second jar. Pulled seals free and pick up to 6,040'. Lost 5 bbls of SFMOBM after pulling out of seals. Circulate bottoms up @ 286 gpm, 1,740 psi. Monitor well - OK. Pump dry job. POH from 6,040 to 120' without problem and proper pipe displacement. PJSM. Laydown whipstock retrieval BHA. Break down dummy seal assembly. `Whipstock had been milled right of center of tray, digging into main body of whipstock. Examination of whipstock explained the reason for the right hand azimuth swing when drilling out of window.. Full window length had been drilled. Clear and clean rig floor. Rig up to run L3 liner assembly. PJSM. Pick up 4.5" 12.6# L-80 BTC-M solid bent joint with float shoe. RIH with 41 jts 4.5" 12.6# L-80 BTC slotted liner, XO, 5 jts solid 4.5" 12.6# L-80 IBT, Swell Packer assembly, 4 jts solid 4.5" 12.6# L-80 IBT, XO, 40 of 75 joints slotted liner to 4,030 ~ end of tour. Make up BTC /IBT liner to 3,800 Ib/Ibs using Best - O -Life 2000 NM. Run floating centralizers on each joint starting with joint #4 in the hole. Record PU and SO weights every 1,000' in cased hole. Continue running in hole with OBa slotted liner assembly from 4,030' to 5,859'. Run remaining 35 out of 75 joints of slotted liner, XO, 2 ea spaceout pups, Swell Packer assembly, 8 joints solid liner, Swell Packer assembly, spaceout pup, XO, Baker Flanged Hook Hanger assembly. Checked PU and SO weights every 1,000 ft. in cased hole. Switch over to drill pipe. RIH 3 stands to 6,147'. Went through window on second attempt after putting 3/4 turn in pipe. PU - 100k, SO - 75k. Continue running in hole with OBa slotted liner assembly on 4" drill pipe and 4" HWDP from 6,147' to 11,300' ~ 60 fpm, checking PU and SO weights every 500 ft. in open hole. Check parameters. PU - 180k, SO - 65k. Slack off with indication of top Swell Packer dragging through window, PU - 200k, SO - 55k. Run in hole with Hook Hanger assembly 10' past window on first attempt. Make several attempts to hook liner by turning pipe in 3/4 turn increments. Hang liner on depth. Pick up and turn pipe 180 deg, slack off and run liner hook past window. Pick up above window and turn pipe 180 deg, slack off and pick up several times, hooking liner each time. Set down 20k on hook hanger. Break out topdrive and drop 29/32" ball. Pump ball down ~ 3 bpm, 620 psi. Slow pump to 1.5 bpm, 250 psi prior to seat. Seat ball and pressure up to 3,000 psi and release HR setting tool. Pick up above hook hanger to 5,993' and confirm release from liner with pickup weight of 140k. Pressure up to 4,280 psi to shear ball Printed: 9/5/2006 2:49:57 PM gP Page 21 of 3i Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To Hours ~ Task Code NPT Phase ~ Description of Operations 8/21/2006 ~ 06:00 - 07:30 ~ 1.50 ~ CASE ~ P ~ ~ RUNPRD ~ seat - OK. 'Ran total of 1 jt 4.5" 12.6# L-80 STL pin X BTC box crossover solid liner (shoe joint) 116 jts 4.5" 12.6# L-80 BTC slotted liner 17 jts 4.5" 12.6# L-80 IBT solid liner. Float shoe, PBTMD - 11912' Swell packer - 9,894' to 9,905' Swell packer - 6,487' to 6,498' Swell packer - 6,114' to 6,125' Top of the Hook Hanger - 6,059' 07:30 - 08:00 0.50 CASE P RUNPRD Circulate bottoms up. 220 gpm, 830 psi. Shut down and monitor well - OK. MW - 9.2 ppg. 08:00 - 09:00 1.00 CASE P RUNPRD Cut and slip drilling line 98'. Clean and inspect brakes - OK. 09:00 - 12:30 3.50 CASE P RUNPRD Pump dry job and POH from 5,993' to 30'. 12:30 - 13:00 0.50 CASE P RUNPRD PJSM. Service break liner running tools and laydown same.. 13:00 - 13:30 0.50 CASE P RUNPRD Clear and clean rig floor. 13:30 - 14:00 0.50 TIEBAC P OTHCMP Pick up LEM running tools to rig floor and rig up running equipment. 14:00 - 16:30 2.50 TIEBAC P OTHCMP Make up LEM 2. Baker Bent Non-Locating Seal Assembly, 2 ea spaceout pup joints, LEM Hook Hanger Assembly, Swivel and Seal Bore Extension w/ 19.69'L x 4.75" ID. Rig up false rotary table and RIH and space out with 2 3/8" EUE inner string. Make up Baker ZXP Liner Top Packer w/ 11' L x 5.75" ID throat. 4.5" IBT connections torqued to 3,800 fUlbs. 5.5" HYD torqued to 5,800 ft/Ibs. All connections lubricated with Best-O-Life 2000. 16:30 - 20:00 3.50 TIEBAC P OTHCMP Run in hole with LEM 2 on 4" drill pipe from 150' to 5,966'. Check parameters. PU - 137k, SO - 87k. 20:00 - 22:30 2.50 TIEBAC P OTHCMP Attempt to work LEM through Flanged Hook Hanger. Pipe would take weight at bottom of window C~ 6,076'. Pick up and work torque by turning pipe in tension 3/4 turns and work past bottom of window but only able to go down 5' to 6,081'. Make numerous attempts by turning and working pipe to get past 6,081'. If pipe was picked up above the bottom of window, it would have to be worked through bottom of window again. Tried to work between 6,076' and 6,081' to get past 6,081' without success. '6,081 would put the LEM mule shoe in the L3 lateral assembly just under the HR profile. 22:30 - 00:00 1.50 TIEBAC N DPRB OTHCMP POH from 6,082' to 4,627' to drop out the swivel assembly and change bent seal assembly to a straight seal assembly. 8/22/2006 00:00 - 02:00 2.00 TIEBAC N DPRB OTHCMP Continue POH with LEM 2 from 4,627' to 150' 02:00 - 04:00 2.00 TIEBAC N DPRB OTHCMP PJSM. Laydown packer. Rig up to laydown 2 3/8" inner string. Break out swivel assembly, laydown Seal Bore Ext, LEM Hanger, and laydown bent Seal Assembly. 04:00 - 05:30 1.50 TIEBAC N DPRB OTHCMP Pick up straight Seal Assembly, spaceout pups, LEM Hanger, pup joint that replaced swivel assembly, Seal Bore Ext. Rig up and run 2 3/8" EUE inner string. Make up Baker ZXP Liner Top Packer. 05:30 - 09:00 3.50 TIEBAC N DPRB OTHCMP Run in hole with LEM 2, Run #2 from 150' to 5,965' on 4" DP and 4" HWDP. Obtain parameters, PU - 137k, SO - 87k. 09:00 - 10:00 1.00 TIEBAC N DPRB OTHCMP Slack off through top of liner and bottom of window with slight Printed: 9/5/2006 2:49:57 PM gp Page 22 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/22/2006 09:00 - 10:00 1.00 TIEBAC N DPRB OTHCMP reductions in slack off weights. Stacked out at 6,081' on every attempt by turning pipe in 3/4 turn increments, bouncing pipe, rotating pipe, all without exiting bottom of window ~ 6,076' and entering L3 liner. 10:00 - 13:30 3.50 TIEBAC N DPRB OTHCMP Pump dry job and POH from 6,061' to 290' to change out straight Seal assembly for bent Seal assembly 13:30 - 14:00 0.50 TIEBAC N DPRB OTHCMP PJSM. Rig up to laydown LEM assembly. 14:00 - 16:00 2.00 TIEBAC N DPRB OTHCMP Laydown LEM, stand back inner string. No markings on mule shoe. 16:00 - 16:30 0.50 TIEBAC N DPRB OTHCMP Prepare rig floor, laydown straight Seal assembly, pick up Bent Seal assembly. 16:30 - 18:00 1.50 TIEBAC N DPRB OTHCMP Pick up bent Seal Assembly, spaceout pups, LEM Hanger, pup joint, Seal Bore Ext. Rig up and run 2 3/8" EUE inner string. Make up Baker ZXP Liner Top Packer. 18:00 - 21:00 3.00 TIEBAC N DPRB OTHCMP Run in hole with LEM 2, Run #2 from 150' to 5,965' on 4" DP and 4" HW DP. Obtain parameters, PU - 138k, SO - 86k. 21:00 - 00:00 3.00 TIEBAC N DPRB OTHCMP Slack off and go through top of liner OK. Tagged up on bottom of window. Pick up and turn pipe 3/4 turn. Slack off and tag up ~ 6,081'. Pick up and start turning pipe in 1/4 tum increments starting @ 6,063'. Repeat process going down in 1 ft. increments to bottom of window ~ 6,076' stopping pipe on torque peaks (same location on pipe each time) then slacking off on pipe without success tagging up @ 6,081' every time. Tried rotating C«? 4 rpm through window without success. 8/23/2006 00:00 - 03:00 3.00 TIEBAC N DPRB OTHCMP Pump dry job. POH from 6,061 to 160'. 03:00 - 05:00 2.00 TIEBAC N DPRB OTHCMP PJSM. Laydown LEM #2. Rig up and stand back inner string. Mule shoe had grooves on the opposite side of where they were on first run. Grooves ran from bottom of shoe to 18 inches above. Bottom set of seals were damaged. 05:00 - 05:30 0.50 TIEBAC N DPRB OTHCMP Clear and clean rig floor. Pick up dummy LEM to rig floor. 05:30 - 06:00 0.50 TIEBAC N DPRB OTHCMP .Make up dummy LEM, XO, float sub, MWD, XO. 06:00 - 08:30 2.50 TIEBAC N DPRB OTHCMP .Run in hole with dummy LEM assembly from 67' to 5,968'. Shallow hole tested MWD ~ 1,105'. 08:30 - 09:00 0.50 TIEBAC N DPRB OTHCMP Fill pipe, break circulation. PU - 140k, SO - 85k. Slack off pipe to above liner top and orient dummy LEM to 20 deg right of high side. 308 gpm, 1,730 psi. Slack off and latch up dummy LEM on liner top. Toolface flopped over to 96 deg right of high side. Pick up and unlatch from liner. Toolface went from 96 deg to 72 deg. Slack back off and re-latch. Toolface went back to 96 right. Pick up and unlatch LEM, stand back 1 stand of drill pipe. 09:00 - 09:30 0.50 TIEBAC N DPRB OTHCMP Circulate bottoms up C~ 6,063' C~ 308 gpm, 1,730 psi. Observe well - OK. MW - 9.3 ppg. 09:30 - 12:30 3.00 TIEBAC N DPRB OTHCMP Pump dry job. POH from 6,063' to dummy LEM. Laydown dummy LEM assembly. 12:30 - 13:00 0.50 TIEBAC N DPRB OTHCMP Service topdrive, crown, and drawworks. 13:00 - 20:00 7.00 TIEBAC N DPRB OTHCMP Wait on truck to deliver bent 3.5" tubing joint. 20:00 - 22:00 2.00 TIEBAC N DPRB OTHCMP Rig up and make up bent joint assembly. 3.5" tubing joint, XO, 4.5" tubing joint, XO, float sub, MWD, XO. Maximum OD - 5.23" on 4.5" tubing collar. 22:00 - 00:00 2.00 TIEBAC N DPRB OTHCMP Run in hole with bent joint assembly from 124' to 2,400'. Shallow hole tested MWD ~ 1,527' - OK. 8/24/2006 00:00 - 00:30 0.50 TIEBAC N DPRB OTHCMP Run in hole with 3.5" bent joint assembly from 2,400' to 6,034'. Printed: 9/5/2006 2:49:57 PM gp Page 23 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date 'From - To Hours Task Code NPT Phase Description of Operations 8/24/2006 00:00 - 00:30 0.50 TIEBAC N DPRB OTHCMP PU - 130k, SO - 85k. 00:30 - 02:30 2.00 TIEBAC N DPRB OTHCMP Fill pipe and break circulation ~ 301 gpm, 1,890 psi. Orient above liner top ~ 90 deg left. Slack off and tag up ~ 6,070', pick up and turn pipe 1/8 turn. *Note: MWD quit giving good tool faces once inside of liner due to noise. Slack off and tag up ~ 6,069'. Pick up and turn pipe 1/8" tum. Turn off pumps and slack off and go down hole taking 0-7k weight and tag up ~ 6,116' with 15k, with 4.25" OD collar ~ 6,081'. Pick up to above bottom of window, pulling 30k over pick up weight. Bring pumps up to 301 gpm, 1,890 psi and slack back off going down without taking weight. Tag up C~3 6,115' with 15k and 100 psi increase in pump pressure. Pick up without taking weight and pump pressure returning to normal. Turn pipe 180 deg, slack off and tag up @ bottom of window. Pick up and turn pipe 1/8" turn. Slack off and run in Mother Bore hole without taking weight until 6,144' with MWD STAB landing on top of liner. Bottom of 3.5" mule shoe ~ 6,144' (mule shoe 17' inside of SBR). Stand back 2 stands with no drag. Observe well - OK. MW - 9.3 PP9• 02:30 - 05:00 2.50 TIEBAC N DPRB OTHCMP Pump dry job and POH from 6,030' to 133'. 05:00 - 06:00 1.00 TIEBAC N DPRB OTHCMP Rig up and laydown 3.5" bent joint assembly. Small amount of scarring on 4.5" x 3.5" crossover. Mule shoe OK. 06:00 - 06:30 0.50 TIEBAC N DPRB OTHCMP Clear and clean rig floor. 06:30 - 08:00 1.50 TIEBAC N DPRB OTHCMP Pick up and make up LEM 2, Run #4. Bent non locating seal assembly with bend ~ 10' up from mule shoe, 7" off center. Mule shoe oriented 180 deg from previous bent seal assembly, 2 ea 4.5" 12.6# L-80 IBT space out pups, LEM Hanger assembly, 4.5" IBT pup joint, XO bushing, Baker Seal Bore Extension w/ 19.69' L x 4.75" ID, rig up and run 2 3/8" EUE inner string. Make up Baker ZXP Liner Top Packer w/ 11' L x 5.75" throat, Hydraulic setting tool. 08:00 - 11:00 3.00 TIEBAC N DPRB OTHCMP Run in hole from 149' to 6,061'. Make up topdrive. 11:00 - 12:30 1.50 TIEBAC P OTHCMP Fill pipe and break circulation. PU- 135k, SO - 90k. Slack off and tag up inside of L3 liner @ 6,081'. Pick up and turn pipe 1/8" turn. Slack off and tag up inside of L3 liner ~ 6,081'. Pick up and turn pipe 1/8" turn. Slack off and enter Mother Bore and tag up on top of Seal Bore Extension @ 6,127'. Pick up and turn pipe 40 deg. Break circulation and wash down and enter Seal Bore Extension without any down drag. Slack off and set with 30k down weight to latch LEM with seal assembly 11 ft inside of Seal Bore Extension. Pick up 25k over string weight to verify latch-up. Slack off and re-latch LEM with 30k under slack off weight. Pick up to 125K up weight. Break out topdrive, drop 1 3/4" ball and pump same with 3 bpm, 900 psi. Reduce pump rate to 2 bpm, 610 psi prior to ball landing. Seat ball and pressure up to 3,000 psi to set packer. Slack off to 105k and increase pressure to 4,000 psi to release HR running tool. Bleed off pressure and test annulus to 1,500 psi - OK. Bottom of seals X6,141' Top of LEM 2 ~ 6,003' 12:30 - 13:00 0.50 TIEBAC P OTHCMP Circulate bottoms up ~ 197 spm, 932 psi. Monitor well - OK. MW - 9.3 PP9• Printed: 9/5/2006 2:49:57 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date i From - To 8/24/2006 13:00 - 15:30 15:30 - 16:30 16:30 - 17:00 17:00 - 19:00 19:00 - 22:30 22:30 - 23:00 23:00 - 00:00 8/25/2006 00:00 - 01:00 01:00 - 06:30 06:30 - 08:00 08:00 - 10:00 10:00 - 11:30 11:30 - 12:00 12:00 - 13:00 13:00 - 14:30 14:30 - 15:00 15:00 - 15:30 15:30 - 18:00 18:00 - 19:00 19:00 - 20:00 20:00 - 20:30 BP Page 24 of 31 Operations Summary Report L-204 L-204 DRILL+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Hours i Task Code NPT 2.50 TIEBAC P 1.00 TIEBAC P 0.50 TIEBAC P 2.00 WHIP P 3.50 WHIP P 0.50 WHIP P 1.00 WHIP P 1.00 WHIP P 5.50 STWHIP P 1.50 STWHIP P 2.00 STWHIP P 1.50 STWHIP P 0.50 STWHIP P 1.00 BOPSU P 1.50 DRILL P 0.50 DRILL P 0.50 DRILL P 2.50 DRILL P 1.00 DRILL P 1.00 DRILL P 0.50 DRILL P Spud Date: 7/16/2006 Start: 7/15/2006 End: 9/3/2006 Rig Release: 9/3/2006 Rig Number: Phase Description of Operations OTHCMP Pump dry job and POH from 6,000' to 145'. OTHCMP PJSM. Service break running tool. Rig up and lydown 2 3/8" inner string OTHCMP Clear and clean rig floor. WEXIT PJSM. Pick up and make up Whipstock assembly #3 for OA window. Seal assy, no go, unloader sub, 1 jt 3.5" HWDP, xo, PxP sub, safety disconnect, unloader, debris sub, ported sub, whipstock, window mill, lower mill, flex joint, upper mill, 1 jt 3.5" HWDP, float sub, MWD, bumper sub, 9 4 3/4" DC's, 7 stands 4" drill pipe, 8 stands 4" HWDP to 1,855'. Shallow hole tested MWD ~ 1,098'. WEXIT Run in hole with whipstock assembly from 1,855' to 5,967'. Filled pipe C~ 4,100'. Make up top drive. WEXIT Establish circulation C~ 298 gpm, 2,350 psi. PU - 130k, SO - 85k. Orient whipstock to 13 deg left of high side. Slack off and stab dummy seals and verify orientation - OK. Slack of 20k to set anchor. Pick up to 10k over string weight to confirm anchor set. Slack off and set 30k to shear lugs. Test backside with 1,500 psi - OK. Blowdown lines. WEXIT Displace well from 9.3 ppg SF MOBM to 9.2 ppg MOBM @ 289 gpm, 2,165 psi. WEXIT Continue displacing well from 9.3 ppg SF MOBM to 9.2 ppg MOBM ~ 289 gpm, 2,165 psi. Obtain slow pump rates. WEXIT Mill OA window starting top of window ~ 5,930 to bottom of window ~ 5,942'. 247 gpm, 1,415 psi, 60 rpm, 6k TO. Continue drilling with starting mill from 5,942' to 5,962' putting upper mill through bottom of window. 247 gpm, 1,385 psi, 105 rpm, 4-5k TO. PU - 125k, SO - 85k, RT - 100k. WEXIT Pump 50 bbl high vis, 2 Ib over weighted sweep while wiping up and down through window. No increase in cuttings when sweep returned to surface. Shut down pump and wipe in and out of window without problem. Monitor well - OK. MW - 9.2 ppg. Pump dry job. WEXIT POH from 5,930' to 372'. PU - 133k, SO - 95k. WEXIT Stand back 4 3/4" drill collars. Laydown whipstock milling assembly. Upper mill was in gauge. WEXIT Clear and clean rig floor. WEXIT Pull wear bushing. Make up BOP stack jetting tool and flush stack and flow line. Function all BOP's. Laydown jetting tool. Install wear bushing. PROD5 PJSM. Pick up and make up OA 6 3/4" BHA #17, RR Hycalog DS 146 bit, 1.5 bent motor with AIM, bypass sub w/ float, NM STB, MWD/LWD, orient and load nuclear source, VPWD, ADN, 2 ea NM flex DC's, Circ sub, XO, 1 joint 4" DP, Jar - 236'. PROD5 Run in hole with BHA #17 from 236' to 510'. PROD5 Crew held safety meeting with Crane Pro rep. Jason Gammon and Arctic Wire Rope rep. Gary Moore. PROD5 Continue run in hole with BHA #17 from 510' to 5,878'. Shallow hole tested MWD ~ 1,192'. Filled pipe ~ 4,061' PROD5 Slip and cut drilling line 98'. Inspect and adjust brakes. PROD5 Service topdrive, crown, blocks, and drawworks. PROD5 Establish circulation. Obtain slow pump rates. CECD - 10.13 ppg. Orient high side and RIH from 5,878', through window Printed: 9/5/2006 2:49:57 PM BP Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Event Name: DRILL+COMPLETE Start: 7/15/2006 Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To I Hours I Task I Code ! NPT I Phase 8/25/2006 20:00 - 20:30 I 0.501 DRILL ~P 20:30 - 21:30 I 1.001 DRILL I P 21:30 - 22:00 0.50 DRILL P 22:00 - 22:30 0.50 DRILL P 22:30 - 23:30 I 1.001 DRILL I P 23:30 - 00:00 I 0.501 DRILL I P 8/26/2006 100:00 - 12:00 12.00 DRILL P 12:00 - 00:00 I 12.001 DRILL I P 8/27/2006 ~ 00:00 - 12:00 ~ 12.00 I DRILL P 12:00 - 00:00 I 12.001 DRILL I P 8/28/2006 100:00 - 02:30 I 2.501 DRILL I P Page 25 of 31 Spud Date: 7/16/2006 End: 9/3/2006 Description of Operations PROD5 from 5,930' to 5,942' without problem. Continue wash down to 5,962' PROD5 Directionally drill 6.75" OA L4 from 5,962' to 5,995' 100% sliding. 285 gpm, 2,180 psi off, 2,300 psi on, PU - 120k, SO - 85k, WOB - 10k. CECD 10.13 ppg, AECD - 9.93 ppg. PROD5 Pump up survey.. PRODS Directionally drill 6.75" OA L4 from 5,995' to 6,034' 100% sliding. 285 gpm, 2,180 psi off, 2,300 psi on, PU - 120k, SO - 85k, WOB - 10k. CECD 10.13 ppg, AECD - 9.93 ppg PROD5 Pump up survey. Had trouble with pumping surveys up. Getting spike in the survey frame. Attempted surveys at different pump rates with both pumps. Checked out both pump prior to drilling out. Suction and discharge screens had been cleaned. Both pump pulsation dampeners had correct pressures. Finally were able to get surveys with some MWD software adjustments and only using one pump. PROD5 Directionally drill 6.75" OA L4 from 6,034' to 6,068' 100% sliding. 285 gpm, 2,180 psi off, 2,300 psi on, PU - 120k, SO - 85k, WOB - 10k. CECD 10.13 ppg, AECD - 9.93 ppg, AST - .93 hrs. PROD5 Directionally drill 6.75" OA L4 from 6,068' to 6,610'. 290 gpm, 2,380 psi off, 2,832 psi on, PU - 136k, SO - 83k, RT - 106k, WOB - 5-15k, 60 rpm, 4.5k TO off, 5.5k TO on. CECD 10.21 ppg, AECD - 10.39 ppg. AST - 3.18 hrs, ART - 2.28 hrs. Survery every joint, backream each stand 60' prior to connections. Problem found with surveys. # 2 mud pump's pulsation dampener fill-up needle valve had leaked out nitrogen. Filled back up with proper nitrogen pressure and have had no problem with surveys. 'Drilled into OBa ~ 6,125'. Back into OA ~ 6,272' PRODS Directionally drill 6.75" OA L4 from 6,610' to 8,334'. 290 gpm, 2,500 psi off, 2,650 psi on, PU - 135k, SO - 85k, RT - 108k, WOB - 10k, 60 rpm, 5k TO off, 6k TO on. CECD 10.27 ppg, AECD - 10.35 ppg. AST - 3.4 hrs, ART - 2.25 hrs. Survery every joint, backream each stand 60' prior to connections. Started having problem with surveys again. Changed out # 2 mud pump's pulsation dampener while still drilling with 1 pump ~ 290 gpm. Good surveys after dampener changed out. PROD5 Directionally drill 6.75" OA L4 from 8,334' to 9,863'. 290 gpm, 2,736 psi off, 3,010 psi on, PU - 146k, SO - 73k, RT - 103k, WOB - 5-15k, 60 rpm, 6.4k TO off, 7.8k TO on. CECD 10.31 ppg, AECD - 10.80 ppg. AST - 1.33 hrs, ART - 2.10 hrs. Survey every 30', backream 60' prior to connections. Pumped 30 bbl high vis, 2 Ib over weighted sweep ~ 9,000' and returned appx 10% increase in cuttings when back to surface. PROD5 Directionally drill 6.75" OA L4 from 9,863' to 11,489'. 290 gpm, 2,890 psi off, 3,100 psi on, PU - 150k, SO - 70k, RT - 106k, WOB - 5-15k, 60 rpm, 7k TO off, 8k TO on. CECD 10.41 ppg, AECD - 10.83 ppg. AST - 1.22 hrs, ART - 3.68 hrs. Survey every 30', backream 60' prior to connections. PROD5 Directionally drill 6.75" OA L4 from 11,489' to TD ~ 11,890' MD, 4,555' ND. 290 gpm, 2,730 psi off, 3,178 psi on, PU - 159k, SO - 69k, RT - 102k, WOB - 5-15k, 60 rpm, 7.1 k TO off, Printed: 9/5/2006 2:49:57 PM gp Page 26 of 31 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: L ell Name: L e: Name: ;From - To -204 -204 DRILL+C NABOB NABOB Hours OMPLE S ALASK S 9ES Task TE A DRI Code ~ LING NPT Start I Rig Rig Phase Spud Date: 7/16/2006 : 7/15/2006 End: 9/3/2006 Release: 9/3/2006 Number: Description of Operations 8/28/2006 00:00 - 02:30 2.50 DRILL P PROD5 8.3k TO on. CECD 10.42 ppg, AECD - 10.82 ppg. AST - .5 hrs, ART - .75 hrs. Survey every 30', backream 60' prior to connections. 02:30 - 04:00 1.50 DRILL P PRODS Circulate, rotate and reciprocate for 15 minutes to check ECD's prior to pumping sweep - OK. Pump 2 Ib weighted sweep surface to surface with no increase in cuttings when sweep back to surface. 290 gpm, 2890 psi, 60 rpm, 7.5k TO. CECD - 10.42 ppg, AECD - 9.99 ppg. 04:00 - 12:00 8.00 DRILL P PROD5 Madpass log from bit depth of 11,890' to 9,576' ~ 600 fph, 290 gpm, 2,850 psi, 60 rpm, 8.1 k TO. CECD - 10.42 ppg, AECD - 9.99 PP9• 12:00 - 00:00 12.00 DRILL P PROD5 Mad Pass log from bit depth of 9,576' to 6,490'. All depths logged ~ 600 fph except Swell Packer intervals from 9,110' to 8,970' and 8,610' to 8,470', 6,630' to 6,490' @ 200 fph. 290 gpm, 2,140 psi, 60 rpm, 4k TO. CECD - 10.15 ppg, AECD - 10.05 ppg. 8/29/2006 00:00 - 02:00 2.00 DRILL P PROD5 Continue Madpass logging from bit depth of 6,490' to 6,160' ~ 600 fph, 6,160' to 6,135' @ 200 fph. 290 gpm, 2,080 psi, 60 rpm, 4.3k TO. Stop rotating, orient bit @ 10 deg right. Continue Madpass from 6,135' to 5,973' (Bit depth) without rotating. Pull 1 more stand to get bit into casing to 5,878' 02:00 - 02:30 0.50 DRILL P PROD5 Service topdrive, blocks, and crown. 02:30 - 05:30 3.00 DRILL P PROD5 Run in hole from 5,878' to 11,776' with one tight spot ~ 9,000'. Picked up and filled pipe ~ 8,990' and went back down without problem with pump off. Precautionary wash from 11,776' to 11,890' 05:30 - 08:00 2.50 DRILL P PROD5 Circulate bottoms up ~ 290 gpm, 2,950 psi, 102k rotating weight, 60 rpm, 7k TO. Prepare to displace to SF MOBM. 08:00 - 09:30 1.50 DRILL P PRODS Displace hole from 9.2 ppg MOBM to 9.2 ppg SF MOBM ~ 290 gpm, 2,950 psi, 102k rotating weight, 60 rpm, 7k TO. 09:30 - 10:00 0.50 DRILL P PROD5 Monitor well - OK. POH from 11,890' to 11,383'. Pump dry job. PU - 173k, SO - 73k. 10:00 - 16:00 6.00 DRILL P PROD5 POH from 11,383' to 236'. Recorded up and down weights every 500' in open hole, and every 1,000' in cased hose. 16:00 - 17:30 1.50 DRILL P PROD5 PJSM. Laydown BHA #17. LD jars. LD flex collars. Remove nuclear source and LD ADN. LD PWD, MWD, nm stab, bypass sub w/float, AIM motor and bit. 6-3/4" Hycalog DS 146h+gjuw graded: 0-1-WT-S-X-I-NO-TD (no change from previous runs). 17:30 - 18:30 1.00 DRILL P PROD5 Clear and clean rig floor. Laydown drilling tools off of rig floor. 18:30 - 19:00 0.50 WHIP P RUNPRD PJSM. MU Whipstock Retrieval BHA #18 to 1,506' -retrieving tool, 1 jt 3.5" HWDP, float sub, MWD bumper sub, xo. Orient MWD 180 deg from retrieval hook. 19:00 - 22:00 3.00 WHIP P RUNPRD Run in hole with Whipstock retrieval assembly from 99' to 5,904. Shallow hole tested MWD @ 1,505' - OK 22:00 - 22:30 0.50 WHIP P RUNPRD Check parameters, PU - 135k, SO - 90k. Bring up pumps and orient 167 deg right. Run in hole slow to below top of window @ 5,935'. Pick up and latch on 1st attempt. Pick up and shear anchor ~ 80k over. Slack back down and set down 25k to close jars. Pick up and jar free on 3rd attempt ~ 65k over pull. Pull seals out of LEM 2. Lost 10 bbls SF MOBM. 22:30 - 00:00 1.50 WHIP P RUNPRD Circulate bottoms up ~ 299 gpm, 1,880 psi. Monitor well - OK. 9.2 ppg MW. Pump dry job. Printed: 9/5/2006 2:49:57 PM BP Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Event Name: DRILL+COMPLETE Start: 7/15/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To ~ Hours ! Task !Code ~ NPT Phase 8/30/2006 00:00 - 02:30 02:30 - 03:30 2.50 1.00 WHIP WHIP P P RUNPRD RUNPRD 03:30 - 04:00 0.50 WHIP P RUNPRD 04:00 - 05:00 1.00 CASE P RUNPRD 105:00 - 12:00 I 7.001 CASE I P I I RUNPRD 12:00 - 13:00 I 1.001 CASE I P I I RUNPRD 13:00 - 16:30 ~ 3.50 ~ CASE ~ P ~ ~ RUNPRD 16:30 - 18:00 1.501 CASE P RUNPRD Page 27 of 31 Spud Date: 7/16/2006 End: 9/3/2006 Description of Operations POH with L4 whipstock #3 from 5,935' to 99'. PJSM. Laydown whipstock retrieval BHA. Break down dummy seal assembly. Whipstock had indication of 8 ft window cut. Had slight right hand roll-off ending appx 20 deg right at bottom of slide. Clear and clean rig floor. Rig up to run L4 slotted 4.5" liner assembly. Pick up pup joint and crossovers to rig floor. PJSM. Pick up and make up solid joint with shoe, 69 jts slotted liner, xo, pup jt, Swell Packer assy, 10 jts solid liner 3 ea pup jts, Swell Packer assy, xo, 48 jts slotted finer, xo, pup jt, Swell Packer assy, 10 jts solid liner, 2 pup jts, Swell Packer assy, xo, Flanged Hook Hanger assy with swivel to 5,959'. 3,800 fUlbs make up torque, lubricated with Best-O-Life 2,000. Ran total of: 21 jts (incl x-over bent jt with shoe) 4.5" 12.6# L-80 IBT solid liner. 118 jts 4.5" 12.6# L-80 BTC r3 slotted liner. 4ea 4.5" x 6.3" OD Swell Packer assemblies 7 IBT spaceout pups 4 crossover pups 137 5 3/4" x 4.5" x 8"L straight blade centralizers on joints 2 - 138 2 centralizers on each side of Swell Packers for total of 145 centralizers. Make up crossover and f stand drill pipe. PU - 100k, SO - 70k. Pick up above window ~ 5,930'. Check rpm and torque. 7 rpm, 2.5k TO, RWT - 90k. Run in hole and tag up ~ 6,018' with 5k. Pick up above window and tum string 180 deg. Run in hole and tag up ~ 6,018' with 5k. Pick up above window and tum string 90 deg. Run in hole and tag up @ 6,018' with 5k. Pick up to 5,935' and rotate ~ 7 rpm, catch torque peak ~ 3.6k and run in L4 hole OK to 6,057' Continue run in hole with slotted liner assembly from 6,057' to 11,853'. Record pick up and slack off weights every 500'. Break circulation and obtain parameters. PU - 170k, SO - 70k. Run in hole and hook liner. Pick up and slack off and hook hanger again. Pick up and turn pipe 180 deg. Run in hole past window 10' several times. PU - 190k, SO - 70k. Pick up and turn pipe 180 deg and make several attempts before hooking hanger again. Pick up and set down on hanger several times with 25k - OK. Break out surface pipe connection and drop ball. Pump ball down ~ 2.5 bpm, 535 psi. Slow pump rate to 1.5 bpm, 390 psi prior to ball seating. Seat ball and pressure up to 3,080 psi to shear HR running tool. Pressure up to 4,300 psi to shear ball seat. Pick up and confirm liner release with running tool above top of L4 liner top to 5,892'. PU - 135k. Liner set with shoe ~ 11,879' Swell Packer ~ 8,935 to 8,945' Swell Packer C~3 8,464' to 8,474' Swell Packer C~ 6,457' to 6,467' Printed: 9/5/2006 2:49:57 PM r J gp Page 28 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: ~ Date From - To Hours ~ Task Code NPT Phase Description of Operations 8/30/2006 16:30 - 18:00 1.50 CASE P RUNPRD Swell Packer ~ 5,974' to 5,984' Top of L4 liner ~ 5,925' 18:00 - 19:00 1.00 CASE P RUNPRD Circulate bottoms up ~ 260 gpm, 1,155 psi. Monitor well - OK MW 9.3 ppg. 19:00 - 20:00 1.00 CASE P RUNPRD Cut and slip drilling line 80'. 20:00 - 23:30 3.50 CASE P RUNPRD Pump dry job. PU - 135k, SO - 70k. POH from 5,892' to running tool. Make service breaks on running tool and laydown. 'Layed down 9 joints 4 3/4" drill collars on trip out of hole. 23:30 - 00:00 0.50 CASE P RUNPRD Clear and clean rig floor. 8/31/2006 00:00 - 00:30 0.50 BOPSU P RUNPRD Flush stack. Pull wear bushing, install BOP test plug. 00:30 - 01:00 0.50 BOPSU P RUNPRD Rig up to test BOPE. 01:00 - 05:00 4.00 BOPSU P RUNPRD Pressure test BOPE to 250 psi low, 3,500 psi high for 5 minutes each on all equipment. Tested variable bore rams with 4" and 4.5" test joints. Perform accumulator test. Witnessing of test waived by AOGCC rep Lou Grimaldi. Test witnessed by BP WSL R. French and NAD TP R. Hunt. 05:00 - 05:30 0.50 BOPSU P RUNPRD Rig down test equipment. Pull test plug, install wear bushing. 05:30 - 06:30 1.00 TIEBAC P OTHCMP Rig up to run L4 LEM #3. 06:30 - 08:00 1.50 TIEBAC P OTHCMP Pick up and make up L4 LEM 3 assembly. Baker Non-Locating Seal Assembly, 1 ea 4.5" 12.6# L-80 IBT box X STL pin x-over joint, 1 ea 4.5" 12.6# L-80 IBT liner joint, LEM Hook Hanger Assembly, 1 ea IBT space out pup. Rig up false rotary table and RIH and space out with 2 3/8" EUE inner string with 1.75' stickout. Make up Baker ZXP Liner Top Packer w/ 11' L x 5.75" ID throat. 4.5" IBT connections torqued to 3,800 ft/Ibs. All connections lubricated with Best-O-Life 2000. 08:00 - 10:00 2.00 TIEBAC P OTHCMP Run in hole with LEM assembly on 4" drill pipe and HWDP from 169' to 5,880'. 10:00 - 12:00 2.00 TIEBAC P OTHCMP Obtain parameters. PU - 135k, SO - 85k , 118 gpm, 580 psi. Wash down from 5,880' through hook hanger and observe seals entering LEM #2 SBE. Latch up LEM #3 on L4 liner top on depth. Set down 30k, pick up 15k over string weight to 150k to release LEM. Slack off and re-latch LEM. Set down 30k. Pick up 10k over string weight to confirm latch-up. Drop ball and pump same to seat ~ 3 bpm 650 psi. Seat ball and pressure up to 4,000 psi to set packer and release running tool. Packer set indication ~ 3,100 psi. Bleed off pressure, close rams, and pressure up annulus to 1,500 psi for 10 minutes to confirm packer setting. Good test. Pick up to 5,976' (inner string depth) Bottom of seals ~ 6,036' (13.45 ft inside of LEM #2 SBE) Top of LEM #3 ZXP liner top packer C~ 5,878' 12:00 - 15:00 3.00 TIEBAC P OTHCMP Displace well from 9.3 ppg SF MOBM to 9.2 NaCI brine. Pumped 30 bbls LVT-200 base oil followed by 25 bbls viscosified 9.2 ppg brine, followed by 50 bbls of Safe Surf O mixed with 9.2 ppg brine, followed by clean 9.2 ppg brine. Pumped until clean brine returned to surface. 218 gpm, 415 psi. 15:00 - 17:00 2.00 TIEBAC P OTHCMP Observe well - OK. Clean surface mud equipment. Clean out from under shakers, mud troughs and possum belly. 17:00 - 00:00 7.00 TIEBAC P OTHCMP POH laying down drill pipe and HWDP from 5,946' to 750' Printed: 9/5/2006 2:49:57 PM gp Page 29 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To Hours Task Code NPT 9/1/2006 00:00 - 00:30 0.50 TIEBAC P 00:30 - 01:30 1.00 TIEBAC P 01:30 - 03:00 I 1.501 TIEBAC I P 03:00 - 03:30 ~ 0.50 ~ TIEBAC P 03:30 - 06:30 3.00 TIEBAC P 06:30 - 08:00 1.50 TIEBAC P 08:00 - 08:30 I 0.501 TIEBAC I P 08:30 - 12:00 I 3.501 TIEBAC I P 12:00 - 12:30 0.50 TIEBAC P 12:30 - 14:30 2.00 BUNCO 14:30 - 15:30 ~ 1.00 ~ RU 15:30 - 00:00 I 8.501 RU 9/2/2006 100:00 - 01:30 1.501 RU 01:30 - 02:30 I 1.001 RU 02:30 - 03:30 I 1.001 RU 03:30 - 04:00 I 0.50 I RU Phase Description of Operations ~ ----- OTHCMP Continue POH with LEM running tool laying down drill pipe from 750' to running tool and inner string ~ 140'. OTHCMP Laydown running tool. Rig up and lydown 2 3/8" EUE inner string. Clear rig floor. OTHCMP Run in hole to 3,252' with half of drill pipe out of derrick. 4" mule shoe on bottom of drill pipe. OTHCMP Circulate 30 bbl brine soap pill surface to surface to clear drill pipe of SF MOBM. 294 gpm, 306 psi. PU - 89k, SO - 69k. MW - 9.2 PP9 OTHCMP Monitor well. POH laying down drill pipe from 3,252' to surface OTHCMP Run in hole to 3,186' with half of drill pipe out of derrick. 4" mule shoe on bottom of drill pipe. OTHCMP Circulate 30 bbl brine soap pill surface to surface to clear drill pipe of SF MOBM. 294 gpm, 306 psi. PU - 89k, SO - 69k. MW - 9.2 PP9 OTHCMP Monitor well. POH laying down drill pipe from 3,186' to surface. Laydown mule shoe. OTHCMP Clear and clean rig floor. Pull wear bushing. RUNCMP Rig up to run 4.5" 12.6# 13Cr80 r3 Vam Top completion string. Change out bales. Rig up compensator, rig up I-Wire spool and sheeve. RUNCMP PJSM with all personnel involved. Pick up completion jewelry as per detail to the Phoenix CST Jet pump gauge. ~ 99'. Hook up I-Wire to Phoenix assembly. RUNCMP Continue running in hole with tubing jewelry and tubing from 96' to 4,885' RUNCMP Continue running in hole with 4.5" 12.6# 13Cr80 Vam Top completion string from 4,885' to 5,803' RUNCMP Space out tubing for bottom of mule shoe placement @ 5,886'. Tagged up on bottom of Tie Back Sleave C~ 5,889'. Lay down 3 joints of tubing, pick up 2 ea space-out pups, pick last joint of tubing. Pick up and make up tubing hanger and landing joint. RUNCMP Make I-Wire connection throught tubing hanger. Test hydraulic fitting to 5,000 psi - 5 minutes - OK. Test I-Wire continuity - OK. Terminate I-Wire connection end, wrap around hanger neck. RUNCMP Drain BOP stack. Land tubing. PU - 94k, SO - 75k. Run in tubing hanger lock-down screws. Ran total of 133 jts, 5,580' 4.5" 12.6# 13Cr80 r3 Vam Top tubing joints. 75 ea I-Wire Full Clamps 3 ea I-Wire Half Clamps Mule shoe ~ 5886' (8 ft inside of L4 LEM #3 Tie Back Tops: 4.5" TCII HES "X" Nipple 3.813" ID ~ 5,860' 4.5" TCII HES "X" Nipple 3.813" ID w/ RHC plug ~ 5,839' 7.625" x 4.5" Baker Premier Packer C 5,812' Phoenix CST Jet Pump Gauge ~ 5,790' 4.5" 13Cr HES "XD" Duro Sliding Sleeve ~ 5,769' 4.5" Phoenix Discharge Pressure Sensor @ 5,758' GLM #1 - 4.5" 1" KBG-2, 9Cr, w/ DCK-2 Shear & BEK latch ~ Printed: 9/5/2006 2:49:57 PM gp Page 30 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date 9/2/2006 9/3/2006 From - To ;Hours Task Code NPT Phase . _ _____ _ - _ i _._..__._--- 03:30 - 04:00 ~ 0.50 BUNCO ~ RUNCMP Description of Operations 5,648'. GLM #2 - 4.5" 1" KBG-2, 9Cr, w/ RD Dummy, SBK-2C latch @ 5,537' GLM #3 - 4.5" 1" KBG-2, 9Cr, w/ RD Dummy, SBK-2C latch C~3 4,590' GLM #4 - 4.5" 1" KBG-2, 9Cr, w/ RD Dummy, SBK-2C latch @ 3,011' 4.5" TCII HES "X"Nipple 3.813" ID ~ 2,192' 2 ea 4.5" 12.6# 13Cr80 r3 Vam Top tubing space out pups under top joint of tubing. FMC Tubing Hanger with 1 ft of Blast Rings below hanger on pup jt with 4.5" TCII lifting threads. 04:00 - 07:00 3.00 BUNCO RUNCMP Rig up to circulate. Reverse circulate complete hole volume with 245 bbls of clean 9.2 ppg NaCI brine ~ 125 gpm, 250 psi, followed by 90 bbls of clean 9.2 ppg NaCI brine, followed by 87 bbls 9,2 ppg NaCI brine treated with corrosion inhibitor, followed by 68 bbls of clean 9.2 ppg NaCI brine. 07:00 - 10:00 3.00 BUNCO RUNCMP Drop 1 7/8" ball and rod. Wait to seat. Pressure up to 4,000 psi to set packer. Hold 4,000 psi for 30 minute tubing test - OK. Bleed tubing pressure down to 2,500 psi. Pressure up annulus to 3,500 psi for packer and casing test - 30 minutes - OK. Bleed off annulus pressure to 0 psi, bleed off tubing pressure to 0 psi. Pressure up and shear out DCK valve with 2,800 psi. Pump through valve a few bbls each way to confirm opening of valve. 10:00 - 10:30 0.50 BUNCO RUNCMP Install 2-way-check valve. Test valve by pressuring up annulus to 1,000 psi - OK 10:30 - 12:00 1.50 BUNCO RUNCMP Rig down liner running equipment. Clear and clean rig floor. 12:00 - 00:00 12.00 CLEAN P POST Start MOBM cleanup of derrick windwalls, pull floor mats and clean rig floor and pipe racks. Clean out drip pan. Clean mud pits and mud room of oil base mud. 00:00 - 03:00 3.00 CLEAN P POST Continue cleaning rig Clean-derrick windwalls, pull floor mats and clean rig floor and pipe racks. Clean out drip pan. Clean mud pits and mud room of oil base mud. 03:00 - 04:00 1.00 BOPSU P RUNCMP Nipple down BOP stack. Disconnect turnbuckles, pull riser, set stack on BOP stand. 04:00 - 06:30 2.50 WHSUR P RUNCMP Clean top of tubing hanger. Run I-Wire through tree adaptor flange. Nipple up tree adaptor flange with 1-Wire oriented towards reserve pit. Test adapter flange to 5000 psi 06:30 - 09:00 2.50 WHSUR P RUNCMP Nipple up tree and test to 5,000 psi 09:00 - 10:00 1.00 WHSUR P RUNCMP Rig up DSM Lubricator and pull TWC, rig down lubricator 10:00 - 13:00 3.00 WHSUR P RUNCMP PJSM, Rig up Little Red and test lines to 3,000 psi, Freeze protect tubing and IA to 2,550' with 106 bbls diesel ~ 2.5 bpm, ICP 550 psi, FCP 900 psi. 13:00 - 14:00 1.00 W HSUR P RUNCMP Allow diesel to U-Tube. Final SIP's: OA - 0 psi, IA - 70 psi, Tbg - 0 psi. 14:00 - 15:00 1.00 WHSUR P RUNCMP Install BPV w/ lubricator and test from below to 1,000 psi, Remove double annulus valve on tubing head, install VR plugs, secure well for move. Release Rig from L-204 @ 15:00 hrs, 9/3/2006 for 2006 Yearly Printed: 9/5/2006 2:49:57 PM Printed: 9/5/2006 2:49:57 PM k7 ~~~~~p ~~ L-204 Survey Report Schlumberger Report Date: 1-Aug-06 Survey /DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 104.910° Field: Prudhoe Bay Unii - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure /Slot: L-PAD / S-U TVD Reference Datum: Rotary Table Well: L-204 TVD Reference Elevation: 78.60 ft relative t0 MSL Borehole: L-204 Sea Bed /Ground Level Elevation: 48.75 ft relative to MSL UWI/API#: 500292331400 Magnetic Declination: 23.993° Survey Name /Date: L-204 / Aug 1, 2006 Total Field Strength: 57620.701 nT Tort /AHD / DDI / ERD ratio: 365.536° / 9584.45 ft / 6.948 / 2.030 Magnetic Dip: 80.882° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: July 28, 2006 Location Latllong: N 70.35026009, W 149.32311435 Magnetic Declination Model: BGGM 2006 Location Grid NIE Y/X: N 5978146.730 ftUS, E 583371.740 ftUS North Reference: True North Grid Convergence Angle: +0.63747117° Total Corr Mag North -> True North: +23.993° Grid Scale Factor: 0.99990790 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 00 ft ftUS ftUS lilt U.UU U.UU V.UU -/C.bV U.UU V.UU U.VV U.VV V.VV V.UV U.VV 5`J/tf14b./3 bt533/I./4 IV /V.3JVLOVVJ VV 14`J.3L31143J GYD GC SS 100.00 0.85 12.39 21.40 100.00 -0.03 0.74 0.74 0.72 0.16 0.85 5978147.46 583371.89 N 70.35026207 W 149.32311306 166.00 1.26 13.33 87.39 165.99 -0.07 1.96 1.96 1.91 0.43 0.62 5978148.64 583372.15 N 70.35026531 W 149.32311085 261.00 1.00 28.99 182.37 260.97 0.10 3.82 3.80 3.65 1.07 0.42 5978150.39 583372.77 N 70.35027006 W 149.32310563 351.00 1.31 131.89 272.36 350.96 1.21 5.21 4.27 3.65 2.22 2.02 5978150.40 583373.92 N 70.35027006 W 149.32309632 443.00 4.58 153.98 364.22 442.82 4.55 9.89 4.63 -0.35 4.62 3.70 5978146.43 583376.36 N 70.35025912 W 149.32307688 533.00 6.02 158.29 453.84 532.44 9.72 18.20 11.25 -7.97 7.94 1.66 5978138.85 583379.77 N 70.35023832 W 149.32304991 626.00 7.28 140.25 546.22 624.82 17.44 28.88 21.74 -17.03 13.51 2.61 5978129.85 583385.44 N 70.35021356 W 149.32300467 720.00 8.24 132.06 639.36 717.96 28.29 41.55 34.36 -26.12 22.32 1.56 5978120.86 583394.35 N 70.35018873 W 149.32293315 813.00 8.53 135.67 731.37 809.97 40.15 55.11 47.87 -35.52 32.09 0.65 5978111.57 583404.22 N 70.35016305 W 149.32285386 Last GYD GC SS 875.00 9.83 127.28 792.57 871.17 48.99 64.98 57.68 -42.02 39.51 3.00 5978105.16 583411.71 N 70.35014531 W 149.32 9 First MWD+IFR+MS 941.45 11.66 111.02 857.87 936.47 60.92 77.29 69.43 -47.86 50.30 5.30 5978099.43 583422.56 N 70.35012933 W 149.32 4 1037.16 15.11 111.81 950.97 1029.57 82.93 99.44 90.34 -55.97 70.91 3.61 5978091.56 583443.27 N 70.35010719 W 149.322 68 1132.97 19.34 108.37 1042.46 1121.06 111.17 127.80 117.59 -65.61 97.58 4.54 5978082.21 583470.03 N 70.35008084 W 149.32232224 1229.64 23.03 106.69 1132.58 1211.18 146.06 162.73 151.40 -76.09 130.89 3.87 5978072.11 583503.46 N 70.35005221 W 149.32205178 1324.32 25.69 102.66 1218.83 1297.43 185.09 201.76 189.28 -85.91 168.67 3.31 5978062.71 583541.33 N 70.35002538 W 149.32174516 1420.06 30.67 99.73 1303.20 1381.80 230.18 246.95 233.07 -94.59 213.01 5.40 5978054.52 583585.77 N 70.35000167 W 149.32138518 1515.04 36.39 97.47 1382.35 1460.95 282.28 299.39 283.96 -102.36 264.87 6.16 5978047.34 583637.70 N 70.34998045 W 149.32096422 1610.55 42.03 95.77 1456.32 1534.92 341.99 359.74 342.70 -109.26 324.82 6.01 5978041.10 583697.72 N 70.34996159 W 149.32047754 1711.65 40.01 95.64 1532.60 1611.20 407.49 426.09 407.65 -115.86 390.84 2.00 5978035.24 583763.81 N 70.34994355 W 149.31994159 1807.00 41.19 96.35 1604.99 1683.59 468.79 488.14 468.80 -122.34 452.55 1.33 5978029.44 583825.58 N 70.34992583 W 149.31944065 1902.84 39.77 96.73 1677.89 1756.49 530.34 550.36 530.39 -129.42 514.36 1.50 5978023.05 583887.46 N 70.34990647 W 149.31893888 1998.47 41.97 96.35 1750.20 1828.80 592.25 612.93 592.48 -136.55 576.53 2.32 5978016.62 583949.69 N 70.34988700 W 149.31843425 SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204\L-204 Generated 10/2/2006 12:57 PM Page 1 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft n n ft ft de 100 ft ftUS ttUS 1Uy4.14 44.tSb yEi.VS ltSly.(iy 1tSyt5.Ly (i5/.1;t b/tS.Fi/ (i5/./ti -14:i.(i4 Ei41 .ti2S :i.U'L Sy/ifU1V.G5 52f4U1b.11 N /U. ~4yti(i/(iU W 14y.:i1/~JU3/L 2189.87 47. 22 96.54 1886.15 1964. 75 725.35 747.57 726 .28 -151.20 710. 36 2.50 5978003.45 584083.67 N 70. 34984693 W 149.31734781 2285.57 50. 89 96.76 1948.85 2027. 45 796.87 819.84 798 .26 -159.58 782. 15 3.84 5977995.88 584155.54 N 70. 34982403 W 149.31676507 2381.11 49. 73 96.68 2009.87 2088. 47 869.64 893.36 871 .54 -168.18 855. 16 1.22 5977988.09 584228.64 N 70. 34980051 W 149.31617238 2477.10 50. 42 96.89 2071.47 2150. 07 942.52 966.97 944 .96 -176.88 928. 26 0.74 5977980.21 584301.82 N 70. 34977672 W 149.31557901 2572.36 51. 15 96.59 2131.70 2210. 30 1015.57 1040.78 1018 .59 -185.54 1001. 55 0.80 5977972.36 584375.20 N 70. 34975304 W 149.31498403 2668.18 49. 72 96.60 2192.73 2271. 33 1088.66 1114.64 1092 .30 -194.02 1074. 93 1.49 5977964.70 584448.66 N 70. 34972983 W 149.31438839 2764.00 50. 25 96.37 2254.34 2332. 94 1161.25 1188.03 1165 .54 -202.31 1147. 85 0.58 5977957.22 584521.66 N 70. 34970716 W 149.31379648 2859.46 50. 30 96.81 2315.35 2393. 95 1233.90 1261.45 1238 .84 -210.73 1220. 78 0.36 5977949.61 584594.68 N 70. 34968411 W 149.31320443 2954.76 50. 37 96.20 2376.18 2454. 78 1306.47 1334.81 1312 .08 -219.05 1293. 67 0.50 5977942.11 584667.64 N 70. 34966137 W 149.31261276 3050.79 50. 20 96.28 2437.54 2516. 14 1379.50 1408.68 1385 .83 -227.07 1367. 10 0.19 5977934.90 584741.15 N 70. 34963940 W 149.31 8 3146.15 49. 93 96.13 2498.75 2577. 35 1451.78 1481.80 1458 .84 -234.98 1439. 79 0.31 5977927.81 584813.92 N 70. ~ 34961778 W 149.31 3241.60 50. 12 9626 2560.07 2638. 67 1524.08 1554.94 1531 .89 -242.87 1512. 51 '0.22 5977920.72 584886.72 N 70. 34959617 W 149.31083632 3337.25 50. 04 96.54 2621.45 2700. 05 1596.63 1628.30 1605 .17 -251,05 1585. 41 0.24 5977913.36 584959.70 N 70. 34957379 W 149.31024455 3412.18 49. 40 96.45 2669.90 2748. 50 1653.18 1685.47 1662 .28 -257,51 1642. 21 0.86 5977907.52 585016.56 N 70. 34955609 W 149.30978351 3510.50 49. 38 95.86 2733.90 2812. 50 1726.95 1760.11 1736 .83 -265.52 1716. 42 0.46 5977900.35 585090.84 N 70. 34953418 W 149.30918112 3606.56 48. 75 97.03 2796.84 2875. 44 1798.72 1832.67 1809 .34 -273.66 1788. 53 1.13 5977893.01 585163.03 N 70. 34951190 W 149.30859579 3701.74 49. 73 96.79 2858.98 2937. 58 1870.11 1904.77 1881 .40 -282.33 1860. 10 1.05 5977885.13 585234.69 N 70. 34948816 W 149.30801483 3797.81 51. 14 95.12 2920.17 2998. 77 1943.26 1978.82 1955 .38 -290.00 1933. 75 1.99 5977878.28 585308.42 N 70. 34946715 W 149.30741694 3893.70 50. 93 93.93 2980.47 3059. 07 2016.60 2053.38 2029 .76 -295.89 2008. 07 0.99 5977873.23 585382.79 N 70. 34945102 W 149.30681364 3989.02 50. 62 94.78 3040.75 3119. 35 2089.19 2127.22 2103 .42 -301.49 2081. 70 0.76 5977868.44 585456.47 N 70. 34943565 W 149.30621597 4084.90 50. 09 94.60 3101.92 3180. 52 2161.84 2201.05 2177 .11 -307.53 2155. 28 0.57 5977863.22 585530.11 N 70. 34941910 W 149.30561869 4180.57 49. 73 94.27 3163.53 3242. 13 2233.81 2274.24 2250 .15 -313.19 2228. 25 0.46 5977858.38 585603.13 N 70. 34940358 W 149.30502635 4276.33 49. 24 94.88 3225.74 3304. 34 2305.43 2347.04 2322 .83 -319.00 2300. 82 0.70 5977853.38 585675.75 N 70. 34938766 W 149.30443729 4371.36 49. 19 95.48 3287.82 3366. 42 2376.35 2418.99 2394 .70 -325.49 2372. 48 0.48 5977847.68 585747.47 N 70. 34936985 W 149.30385562 4467.82 48. 78 95.70 3351.12 3429. 72 2448.17 2491.77 2467. 43 -332.58 2444. 92 0.46 5977841.40 585819.97 N 70. 34935042 W 149.30326763 4562.97 50. 82 95.77 3412.53 3491. 13 2519.91 2564.45 2540 .06 -339.84 2517. 22 2.14 5977834,94 585892.35 N 70. 34933052 W 149.30268069 4658.78 51. 00 96.65 3472.95 3551. 55 2593.42 2638.81 2614 .40 -347.89 2591. 15 0.74 5977827.72 585966.35 N 70. 34930847 W 149.30208062 4754.14 51. 01 96.40 3532.95 3611. 55 2666.74 2712.92 2688 .50 -356.31 2664. 78 0.20 5977820.12 586040.07 N 70. 34928539 W 149.301 4849.66 50. 93 96.02 3593.10 3671. 70 2740.09 2787.12 2762 .68 -364.34 2738. 55 0.32 5977812.92 586113.91 N 70. 34926339 W 149.30 4 4944.97 50. 49 96.74 3653.46 3732. 06 2813.04 2860.89 2836 .43 -372.53 2811. 86 0.74 5977805.54 586187.30 N 70. 34924093 W 149.30028909 5041.18 50. 39 96.73 3714.73 3793. 33 2886.46 2935.06 2910 .59 -381.23 2885. 52 0.10 5977797.66 586261.05 N 70. 34921709 W 149.29969117 5136.35 50. 47 97.34 3775.36 3853. 96 2959.13 3008.42 2983 .95 -390.22 2958. 33 0.50 5977789.48 586333.95 N 70. 34919246 W 149.29910017 5232.61 49. 20 96.26 3837.45 3916. 05 3031.95 3081.98 3057 .50 -398.93 3031. 37 1.57 5977781.58 586407.07 N 70. 34916857 W 149.29850731 5328.23 49. 07 96.29 3900.01 3978. 61 3103.44 3154.29 3129 .80 -406.84 3103. 25 0.14 5977774.48 586479.03 N 70. 34914690 W 149.29792385 5424.12 48. 71 96.65 3963.06 4041 .66 3174.91 3226.54 3202 .04 -414.98 3175. 03 0.47 5977767.14 586550.89 N 70. 34912458 W 149.29734115 5518.74 49. 22 97.66 4025.18 4103 .78 3245.63 3297.91 3273 .41 -423.87 3245 .85 0.97 5977759.04 586621.80 N 70. 34910020 W 149.29676634 5615.31 48. 55 96.33 4088.68 4167. 28 3317.69 3370.67 3346 .16 -432.73 3318. 06 1.25 5977750.98 586694.09 N 70. 34907590 W 149.29618022 5710.48 48. 46 95.99 4151.74 4230. 34 3388.14 3441.95 3417 .42 -440.38 3388. 93 0.28 5977744.12 586765.04 N 70. 34905492 W 149.29560495 5806.66 50. 16 96.26 4214.44 4293. 04 3460.21 3514.88 3490 .33 -448.17 3461. 44 1.78 5977737.14 586837.62 N 70. 34903356 W 149.29501639 5902.52 54. 11 97.19 4273.27 4351. 87 3535.10 3590.54 3565 .99 -457.04 3536. 58 4.19 5977729.10 586912.85 N 70. 34900922 W 149.29440649 SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204\L-204 Generated 10/2/2006 12:57 PM Page 2 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft n n ft ft de 100 ft ftUS ftUS byytS.U4 5/.lU y(i.y(i 4;fL/. LL 44US.t3L :iFil:i.ltf :ititiy .;i5 :i(i44.2iU -4titi./5 ~(i14./y ;i.14 Sy///"LU .L/ 5tS(iyyl. lFi N /U.:i4i•SytS"L(iU W 14y."Lyi//1liEi 6093.30 60.36 95.81 4376. 66 4455.26 3693.68 3750 .76 3726.19 -475.79 3695.69 3.57 5977712 .13 587072. 15 N 70.34895780 W 149.29311496 6188.96 64.30 95.67 4421. 08 4499.68 3777.30 3835 .46 3810.86 -484.25 3779.97 4.12 5977704 .60 587156. 51 N 70.34893455 W 149.29243087 6284.50 68.00 94.93 4459. 70 4538.30 3863.44 3922 .83 3898.18 -492.32 3866.96 3.94 5977697 .51 587243. 58 N 70.34891240 W 149.29172475 6380.10 71.61 95.88 4492. 70 4571.30 3951.92 4012 .54 3987.84 -500.78 3956.27 3.89 5977690 .05 587332. 97 N 70.34888917 W 149.29099985 6475.79 75.92 97.30 4519. 45 4598.05 4042.80 4104 .39 4079.68 -511.33 4047.51 4.72 5977680 .51 587424. 31 N 70.34886020 W 149.29025926 6571.26 79.79 100.39 4539. 53 4618.13 4135.59 4197 .70 4172.95 -525.69 4139.70 5.14 5977667 .17 587516. 65 N 70.34882082 W 149.28951098 6605.15 82.11 101.65 4544. 86 4623.46 4168.97 4231 .17 4206.34 -532.09 4172.55 7.77 5977661 .14 587549. 56 N 70.34880329 W 149.28924437 6691.45 83.29 99.14 4555. 83 4634.43 4254.30 4316 .77 4291.81 -547.53 4256.74 3.19 5977646 .64 587633. 91 N 70.34876098 W 149.28856106 6723.45 85.22 103.21 4559. 04 4637.64 4286.06 4348 .61 4323.57 -553.70 4287.97 14.02 5977640 .82 587665. 20 N 70.34874407 W 149.28830761 6754.80 89.27 104.77 4560. 54 4639.14 4317.37 4379 .91 4354.67 -561.27 4318.34 13.84 5977633 .59 587695. 65 N 70.34872335 W 149.286 6789.83 89.71 107.94 4560. 85 4639.45 4352.38 4414 .94 4389.27 -571.14 4351.95 9.14 5977624 .10 587729. 37 N 70.34869635 W 149.28 1 6821.68 89.66 109.85 4561. 03 4639.63 4384.15 4446 .79 4420.49 -581.45 4382.08 6.00 5977614 .12 587759. 61 N 70.34866813 W 149.28754377 6849.89 89.50 110.09 4561. 24 4639.84 4412.25 4475 .00 4448.04 -591.08 4408.60 1.02 5977604 .78 587786. 22 N 70.34864177 W 149.28732860 6881.26 89.50 109.90 4561. 51 4640.11 4443.49 4506 .37 4478.69 -601.81 4438.07 0.61 5977594 .39 587815. 82 N 70.34861242 W 149.28708938 6913.87 89.80 110.56 4561. 71 4640.31 4475.96 4538 .98 4510.53 -613.08 4468.67 2.22 5977583 .45 587846. 53 N 70.34858156 W 149.28684106 6946.09 89.75 110.46 4561. 84 4640.44 4508.03 4571 .20 4541.97 -624.37 4498.85 0.35 5977572 .50 587876. 83 N 70.34855067 W 149.28659616 6978.60 89.65 110.23 4562. 01 4640.61 4540.39 4603 .71 4573.72 -635.68 4529.33 0.77 5977561 .54 587907. 43 N 70.34851974 W 149.28634879 7010.27 89.59 110.35 4562. 22 4640.82 4571.92 4635 .38 4604.67 -646.66 4559.03 0.42 5977550 .89 587937. 26 N 70.34848969 W 149.28610773 7042.47 89.34 110.39 4562. 52 4641.12 4603.98 4667 .58 4636.13 -657.87 4589.22 0.79 5977540 .02 587967. 56 N 70.34845902 W 149.28586277 7074.37 89.13 110.51 4562. 94 4641.54 4635.72 4699 .47 4667.30 -669.01 4619.11 0.76 5977529 .21 587997. 57 N 70.34842853 W 149.28562022 7105.82 88.86 110.36 4563. 49 4642.09 4667.02 4730 .92 4698.04 -679.99 4648.57 0.98 5977518 .56 588027. 15 N 70.34839849 W 149.28538110 7138.50 90.34 111.31 4563. 72 4642.32 4699.53 4763 .60 4729.95 -691.61 4679.11 5.38 5977507 .28 588057. 82 N 70.34836668 W 149.28513325 7170.45 94.83 112.94 4562. 28 4640.88 4731.18 4795 .51 4760.95 -703.63 4708.67 14.95 5977495 .59 588087. 51 N 70.34833380 W 149.28489338 7202.13 98.76 113.24 4558. 53 4637.13 4762.31 4826 .96 4791.40 -715.96 4737.60 12.44 5977483 .58 588116. 57 N 70.34830006 W 149.28465860 7234.00 99.74 112.86 4553. 41 4632.01 4793.45 4858 .41 4821.86 -728.28 4766.55 3.29 5977471 .59 588145. 65 N 70.34826636 W 149.28442372 7265.65 97.83 111.91 4548. 58 4627.18 4824.46 4889 .69 4852.26 -740.19 4795.47 6.72 5977460 .00 588174. 69 N 70.34823377 W 149.28418903 7298.30 97.74 111.58 4544. 15 4622.75 4856.58 4922 .04 4883.79 -752.17 4825.51 1.04 5977448 .36 588204. 87 N 70.34820098 W 149.28 0 7329.51 98.25 111.33 4539. 81 4618.41 4887.29 4952 .94 4913.95 -763.48 4854.28 1.82 5977437 .37 588233. 76 3 N 70.34817004 W 149.28 7 7361.39 99.04 111.90 4535. 02 4613.62 4918.59 4984 .46 4944.71 -775.09 4883.58 3.04 5977426 .09 588263. 18 N 70.34813827 W 149.28 9 7392.86 97.21 112.19 4530. 57 4609.17 4949.50 5015 .61 4975.06 -786.78 4912.46 5.89 5977414 .72 588292. 18 N 70.34810628 W 149.28323968 7425.20 95.12 114.04 4527. 10 4605.70 4981.32 5047 .77 5006.26 -799.40 4942.02 8.61 5977402 .43 588321. 89 N 70.34807174 W 149.28299973 7457.09 95.01 113.84 4524. 29 4602.89 5012.69 5079 .53 5036.99 -812.29 4971.06 0.71 5977389 .86 588351. 06 N 70.34803648 W 149.28276415 7488.93 94.68 113.97 4521. 60 4600.20 5044.03 5111 .26 5067.69 -825.15 5000.06 1.11 5977377 .33 588380. 20 N 70.34800130 W 149.28252878 7521.12 94.64 114.10 4518. 98 4597.58 5075.71 5143 .34 5098.74 -838.22 5029.36 0,42 5977364 .59 588409. 64 N 70.34796555 W 149.28229101 7552.26 94.58 114.29 4516. 48 4595.08 5106.34 5174 .38 5128.76 -850.94 5057.68 0.64 5977352 .19 588438. 09 N 70.34793075 W 149.28206127 7584.54 92.58 112.88 4514. 46 4593.06 5138.18 5206 .60 5160.02 -863.83 5087.20 7.58 5977339 .63 588467. 76 N 70.34789548 W 149.28182169 7616.30 89.71 112.05 4513. 83 4592.43 5169.66 5238 .35 5190.98 -875.96 5116.54 9.41 5977327 .83 588497. 23 N 70.34786228 W 149.28158361 7648.32 87.89 112.59 4514. 50 4593.10 5201.40 5270 .36 5222.23 -888.12 5146.15 5.93 5977316 .00 588526. 97 N 70.34782901 W 149.28134330 7680.03 87.74 111.83 4515. 71 4594.31 5232.83 5302 .04 5253.18 -900.09 5175.49 2.44 5977304 .35 588556. 44 N 70.34779624 W 149.28110526 7711.94 88.22 113.41 4516. 83 4595.43 5264.43 5333 .93 5284.28 -912.36 5204.93 5.17 5977292 .42 588586. 00 N 70.34776267 W 149.28086639 SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204\L-204 Generated 10/2/2006 12:57 PM Page 3 of 7 Comments Measured Inclination Azimuth Sut-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de n n tt ft tt ft ft de 00 tt ttUS ttUS 7743.70 88. 75 114. 01 4517. 67 4596. 27 5295.81 5365.68 5315.13 -925. 13 5233.99 2.52 5977279. 97 7775.27 88. 71 113. 94 4518. 37 4596. 97 5326.98 5397.25 5345.76 -937. 95 5262.83 0.26 5977267. 47 7806.85 88. 24 114. 06 4519. 21 4597. 81 5358.15 5428.81 5376.41 -950. 79 5291.67 1.54 5977254. 96 7838.36 87. 67 113. 98 4520. 34 4598. 94 5389.24 5460.30 5406.99 -963. 61 5320.44 1.83 5977242. 46 7870.52 88. 68 116. 43 4521. 36 4599. 96 5420.86 5492.45 5438.05 -977. 30 5349.52 8.24 5977229. 10 7902.47 89.55 116.74 4521. 85 4600.45 5452.15 5524. 39 5468.73 -991. 59 5378. 08 2.89 5977215.12 7933.80 89.59 116.59 4522. 09 4600. 69 5482.82 5555. 72 5498.82 -1005. 65 5406. 08 0.50 5977201.37 7965.98 89.51 116.84 4522. 34 4600. 94 5514.32 5587. 90 5529.74 -1020. 12 5434. 83 0.82 5977187.23 7997.83 88.78 116.39 4522. 82 4601. 42 5545.50 5619. 75 5560.36 -1034. 39 5463. 30 2.69 5977173.28 8029.80 88.14 115.75 4523. 68 4602. 28 5576.86 5651. 71 5591.18 •1048. 43 5492. 00 2.83 5977159.56 8062.07 90.09 116.38 4524. 18 4602. 78 5608.51 5683. 97 5622.32 -1062. 61 5520. 99 6.35 5977145.71 8092.97 89.90 115.49 4524. 18 4602. 78 5638.84 5714. 87 5652.16 -1076. 12 5548. 78 2.95 5977132.50 8124.84 90.01 115.66 4524. 20 4602. 80 5670.16 5746. 74 5683.01 -1089. 88 5577. 52 0.64 5977119.07 8156.62 88.39 113.92 4524. 65 4603. 25 5701.46 5778. 52 5713.88 -1103. 20 5606. 37 7.48 5977106.07 8188.93 88.16 114.35 4525. 62 4604. 22 5733.34 5810. 81 5745.35 -1116. 41 5635. 84 1.51 5977093.19 8220.54 8252.44 8283.50 8314.91 8346.81 8378.73 8410.09 8442.67 8474.38 8505.51 8538.09 8570.41 8601.58 8633.27 8665.72 8697.44 8728.97 8760.50 8792.13 8824.49 8856.41 8888.37 8920.31 8951.93 8983.92 88.41 113.90 4526.57 4605.17 5764.53 5842.41 5776.15 -1129. 32 5664.68 1.63 5977080.60 87.90 113.82 4527. 59 4606.19 5796.03 5874. 29 5807. 27 -1142. 22 5693.84 1.62 5977068.03 88.17 114.40 4528. 66 4607.26 5826.67 5905. 33 5837. 55 -1154. 90 5722.17 2.06 5977055.67 88.54 113.51 4529. 56 4608.16 5857.67 5936. 73 5868. 20 -1167. 65 5750.86 3.07 5977043.24 88.59 112.30 4530. 36 4608.96 5889.25 5968. 62 5899. 46 -1180. 06 5780.24 3.80 5977031.16 88.81 109.41 4531. 08 4609.68 5920.99 6000. 53 5930. 95 -1191. 42 5810.05 9.08 5977020,13 87.80 106.36 4532. 01 4610.61 5952.29 6031. 88 5962. 11 -1201. 04 5839.88 10.24 5977010.84 89.54 102.91 4532. 77 4611.37 5984.85 6064. 45 5994. 63 -1209. 27 5871.39 11.86 5977002.97 87.05 99.32 4533. 71 4612.31 6016.47 6096. 14 6026. 31 -1215. 38 5902.48 13.77 5976997.20 88.68 98.63 4534. 87 4613.47 6047.41 6127. 25 6057. 39 -1220. 23 5933.21 5.69 5976992.69 588615.21 N 70.34772774 W 149.28063052 588644.19 N 70.34769265 W 149.28039651 588673.16 N 70.34765752 W 149.28016249 588702.07 N 70.34762244 W 149.27992910 588731.29 N 70.34758499 W 149.27969314 588760.02 N 70.34754588 W 149.27946134 588788.17 N 70.34750742 W 149.27923417 588817.07 N 70.34746784 W 149.27900095 588845.69 N 70.34742881 W 149.27876993 588874.55 N 70.34739038 W 149.27853701 588903.69 N 70.34735159 W 149.27 588931.62 N 70.34731462 W 149.278 8 588960.52 N 70.34727697 W 149.27784313 588989.51 N 70.34724052 W 149.27760907 589019.12 N 70.34720438 W 149.27736994 589048.10 N 70.34716904 W 149.27713596 589077.39 N 70.34713375 W 149.27689937 589105.86 N 70.34709905 W 149.27666948 589134.69 N 70.34706416 W 149.27643667 589164.20 N 70.34703020 W 149.27619833 589194.14 N 70.34699910 W 149.27595637 589224.07 N 70.34697274 W 149.27571434 589255.67 N 70.34695020 W 149.27545865 589286.82 N 70.34693344 W 149.27520631 589317.60 N 70.34692012 W 149.27495695 88.13 97. 66 4535. 78 4614. 38 6079.75 6159. 82 6089.90 -1224.85 5965.45 3.42 5976988. 44 589349 .88 N 70.34690744 W 149.27469531 86.92 97. 75 4537. 17 4615. 77 6111.79 6192. 10 6122.11 -1229.18 5997.45 3.75 5976984. 47 589381 .93 N 70.34689554 W 149.27443563 86.85 97. 13 4538. 87 4617. 47 6142.65 6223. 23 6153.15 -1233.21 6028.31 2.00 5976980. 78 589412 .83 N 70.34688447 W 149.27 87.53 99. 16 4540. 42 4619. 02 6174.08 6254. 88 6184.75 -1237.69 6059.64 6.75 5976976. 64 589444 .20 4 N 70.34687215 W 149.27 87.62 99. 83 4541. 79 4620. 39 6206.35 6287. 30 6217.15 -1243.04 6091.62 2.08 5976971. 65 589476 .23 N 70.34685747 W 149.27 9 88.77 99. 92 4542. 79 4621. 39 6237.94 6319. 01 6248.84 -1248.48 6122.85 3.64 5976966. 56 589507 .52 N 70.34684254 W 149.27341791 89.09 101. 10 4543. 38 4621. 98 6269.37 6350. 53 6280.36 -1254.23 6153.84 3.88 5976961. 16 589538 .58 N 70.34682676 W 149.27316638 87.51 100. 35 4544. 32 4622. 92 6300.80 6382. 04 6311.87 -1260.09 6184.81 5.55 5976955. 64 589569 .60 N 70.34681067 W 149.27291510 87.00 99. 79 4545. 83 4624. 43 6332.28 6413. 64 6343.45 -1265.62 6215.92 2.39 5976950. 46 589600 .77 N 70.34679551 W 149.27266266 88.32 100. 89 4547. 15 4625. 75 6364.51 6445. 97 6375.78 -1271.42 6247.72 5.31 5976945. 01 589632 .63 N 70.34677958 W 149.27240453 89.05 101. 16 4547. 88 4626. 48 6396.35 6477. 88 6407.69 -1277.52 6279.05 2.44 5976939. 26 589664 .02 N 70.34676284 W 149.27215035 88.80 101. 53 4548. 48 4627. 08 6428.24 6509. 84 6439.64 -1283.81 6310.37 1.40 5976933. 32 589695 .41 N 70.34674560 W 149.27189610 88.42 101. 53 4549. 26 4627. 86 6460.11 6541. 77 6471.57 -1290.19 6341.66 1.19 5976927. 29 589726 .76 N 70.34672809 W 149.27164221 87.20 99. 87 4550. 47 4629. 07 6491.62 6573. 36 6503.16 -1296.06 6372.71 6.51 5976921. 77 589757 .87 N 70.34671199 W 149.27139027 88.85 99. 97 4551. 57 4630. 17 6523.47 6605. 33 6535.12 -1301.56 6404.20 5.17 5976916. 61 589789 .42 N 70.34669687 W 149.27113470 SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204\L-204 Generated 10/2/2006 12:57 PM Page 4 of 7 t Comments Measured inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de it tt ft tt ft tt ft de 100 tt ftUS ttUS `JV 10.0`J Oy.40 ~~.Jy 400L.V4 40JV. 04 0000.U1 OOJ/.VV 0000.// -IJVO. O~ 0430.41 L.OJ 0y/OBI 1.04 00tlOGV.0.7 IV /V.J4000LL0 VV 14.7.C/VOO IJO 9047.71 89.51 100.24 4552. 33 4630. 93 6587.00 6669.12 6598.88 -1312. 36 6467.06 2.65 5976906 .52 589852.39 N 70.34666722 W 149.27062454 9079.47 89.10 99.78 4552. 72 4631. 32 6618.64 6700.88 6630.63 -1317. 88 6498.34 1.94 5976901. 34 589883.72 N 70.34665206 W 149.27037075 9111.40 88.66 99.88 4553. 34 4631. 94 6650.44 6732.80 6662.54 -1323. 33 6529.79 1.41 5976896. 25 589915.24 N 70.34663710 W 149.27011548 9142.97 87.93 99.35 4554. 28 4632. 88 6681.86 6764.35 6694.08 -1328. 60 6560.90 2.86 5976891. 32 589946.40 N 70.34662263 W 149.26986300 9174.68 88.08 98.70 4555. 38 4633. 98 6713.38 6796.05 6725.74 -1333. 57 6592.20 2.10 5976886. 70 589977.75 N 70.34660897 W 149.26960900 9206.81 88.18 100.17 4556. 43 4635. 03 6745.35 6828.16 6757.83 -1338. 84 6623.88 4.58 5976881. 79 590009.48 N 70.34659451 W 149.26935193 9239.10 88.30 99.90 4557. 42 4636. 02 6777.50 6860.43 6790.10 -1344. 46 6655.66 0.91 5976876. 52 590041.32 N 70.34657907 W 149.26909402 9271.02 88.08 99.14 4558. 43 4637. 03 6809.27 6892.34 6821.98 -1349. 74 6687.12 2.48 5976871. 59 590072.84 N 70.34656458 W 149.26883868 9302.69 88.30 102.56 4559. 43 4638. 03 6840.84 6923.99 6853.63 -1355. 70 6718.21 10.82 5976865. 98 590103.98 N 70.34654823 W 149.26858643 9335.03 87.45 104.81 4560. 63 4639. 23 6873.15 6956.31 6885.92 -1363. 34 6749.61 7.43 5976858. 69 590135.46 N 70.34652727 W 149.2 5 9366.94 87.63 107.30 4562. 00 4640. 60 6905.02 6988.19 6917.69 -1372. 16 6780.24 7.82 5976850. 21 590166.19 6 N 70.34650311 W 149.2 9399.00 88.85 108.69 4562. 99 4641. 59 6937.01 7020.23 6949.53 -1382. 06 6810.72 5.77 5976840. 65 590196.77 N 70.34647599 W 149.267 9 9430.69 87.46 107.23 4564. 01 4642. 61 6968.64 7051.91 6981.00 -1391. 82 6840.85 6.36 5976831. 22 590227.00 N 70.34644923 W 149.26759132 9462.46 88.12 110.14 4565. 23 4643. 83 7000.32 7083.65 7012.49 -1401. 99 6870.92 9.39 5976821. 39 590257.18 N 70.34642137 W 149.26734734 9494.57 89.04 112.73 4566. 03 4644. 63 7032.20 7115.75 7044.12 -1413. 72 6900.79 8.56 5976810. 00 590287.18 N 70.34638925 W 149.26710494 9526.25 88.21 114.27 4566. 79 4645. 39 7063.52 7147.42 7075.10 -1426. 35 6929.84 5.52 5976797. 69 590316.36 N 70.34635468 W 149.26686931 9558.13 88.14 113.41 4567. 80 4646. 40 7095.00 7179.29 7106.25 -1439. 23 6958.98 2.71 5976785. 14 590345.65 N 70.34631943 W 149.26663286 9589.95 89.47 115.66 4568. 47 4647. 07 7126.36 7211.10 7137.27 -1452. 44 6987.92 8.21 5976772. 26 590374.73 N 70.34628326 W 149.26639809 9621.29 89.10 116.35 4568. 86 4647. 46 7157.11 7242.44 7167.64 -1466. 18 7016.08 2.50 5976758. 83 590403.04 N 70.34624566 W 149.26616960 9653.96 88.09 115.18 4569. 66 4648. 26 7189.19 7275.10 7199.34 -1480. 38 7045.50 4.73 5976744. 96 590432.61 N 70.34620680 W 149.26593099 9685.96 89.08 115.57 4570. 45 4649. 05 7220.64 7307.09 7230.45 -1494. 09 7074.40 3.33 5976731. 58 590461.66 N 70.34616927 W 149.26569650 9717.59 89.61 116.77 4570. 81 4649. 41 7251.66 7338.71 7261.11 -1508. 03 7102.78 4.15 5976717. 95 590490.19 N 70.34613109 W 149.26546623 9749.37 89.95 115.83 4570. 93 4649. 53 7282.81 7370.49 7291.91 -1522. 11 7131.27 3.15 5976704. 19 590518.83 N 70.34609255 W 149.26523511 9781.51 89.70 118.01 4571. 03 4649. 63 7314.25 7402.63 7322.97 -1536. 66 7159.93 6.83 5976689. 96 590547.65 N 70.34605273 W 149.26500265 9813.20 87.16 121.33 4571. 90 4650. 50 7344.88 7434.31 7353.17 -1552. 34 7187.45 13.19 5976674. 59 590575.34 N 70.34600983 W 149.26477942 9844.97 86.61 122.33 4573. 63 4652. 23 7375.22 7466.03 7383.06 -1569. 07 7214.40 3.59 5976658. 16 590602.47 N 70.34596405 W 149.26456080 9876.74 85.72 124.50 4575. 75 4654. 35 7405.28 7497.73 7412.63 -1586. 53 7240.86 7.37 5976641. 00 590629.12 N 70.34591630 W 149.26434620 9908.44 86.28 123.87 4577. 96 4656. 56 7435.13 7529.35 7442.00 -1604. 29 7267.02 2.66 5976623. 53 590655.47 N 70.34586769 W 149.2641 403 9940.35 86.62 125.03 4579. 94 4658. 54 7465.15 7561.20 7471.53 -1622. 31 7293.28 3.78 5976605. 81 590681.93 N 70.34581840 W 149.26 9972.23 86.74 124.18 4581. 79 4660. 39 7495.11 7593.03 7501.04 -1640. 39 7319.48 2.69 5976588. 03 590708.32 N 70.34576895 W 149.26370855 10004.57 87.04 125.65 4583. 54 4662. 14 7525.45 7625.32 7530.93 -1658. 87 7345.95 4.63 5976569. 84 590735.00 N 70.34571839 W 149.26349380 10036.56 87.73 126.16 4585. 00 4663. 60 7555.29 7657.28 7560.32 -1677. 61 7371.84 2.68 5976551. 39 590761.09 N 70.34566712 W 149.26328387 10068.51 88.84 124.02 4585. 96 4664. 56 7585.26 7689.21 7589.88 -1695. 97 7397.97 7.54 5976533. 33 590787.42 N 70.34561690 W 149.26307195 10099.43 88.92 121.61 4586. 56 4665. 16 7614.68 7720.13 7618.95 -1712. 72 7423.95 7.80 5976516. 87 590813.58 N 70.34557107 W 149.26286123 10131.38 90.02 123.22 4586. 86 4665. 46 7645.14 7752.08 7649.09 -1729. 84 7450.92 6.10 5976500 .05 590840.74 N 70.34552421 W 149.26264249 10162.93 89.64 121.65 4586. 95 4665. 55 7675.23 7783.62 7678.86 -1746. 76 7477.54 5.12 5976483 .42 590867.55 N 70.34547791 W 149.26242652 10194.94 88.82 119.94 4587. 38 4665. 98 7706.01 7815.63 7709.36 -1763. 15 7505.04 5.92 5976467 .35 590895.22 N 70.34543307 W 149.26220351 10226.43 86.49 120.32 4588. 67 4667. 27 7736.37 7847.09 7739.47 -1778. 94 7532.25 7.50 5976451. 86 590922.60 N 70.34538985 W 149.26198281 10258.56 85.64 119.81 4590. 87 4669. 47 7767.31 7879.15 7770.16 -1795. 00 7559.99 3.08 5976436 .11 590950.52 N 70.34534591 W 149.26175779 10290.85 85.49 120.54 4593.37 4671.97 7798.37 7911.34 7800.99 -1811.18 7587.82 2.30 5976420.24 590978.52 N 70.34530162 W 149.26153205 SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204\L-204 Generated 10/2/2006 12:57 PM Page 5 of 7 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure n de de n n n n n n n de 00 n ftUS ftUS I U:fLL.J/ i5tf.34 1L1.U5 45~J5 .U/ 4b /:S.b/ /iSLiS .b4 /y4L.til /tS:iI.V:S -1 i5L/ .Ly /bl4.iSb y.125 5y/b4U4.4:5 byl VVb./3 IV /V..S4bLb/5:5 VV 14y.Gbl31L/tf 10354.19 88.43 120.26 4595 .96 4674.56 7859 .25 7974.62 7861.42 -1843 .51 7642.22 2.50 5976388.52 591033.27 N 70.34521315 W 149.26109084 10386.31 88.32 120.27 4596 .87 4675.47 7890 .21 8006.73 7892.18 -1859 .69 7669.95 0.34 5976372.65 591061.18 N 70.34516887 W 149.26086592 10417.65 87.97 121.00 4597 .89 4676.49 7920 .36 8038.05 7922.14 -1875 .66 7696.90 2.58 5976356.99 591088.30 N 70.34512519 W 149.26064731 10450.39 87.64 120.68 4599 .14 4677.74 7951. 82 8070.77 7953.41 -1892 .43 7724.99 1.40 5976340.54 591116.57 N 70.34507929 W 149.26041948 10482.23 87.75 120.64 4600 .42 4679.02 7982. 44 8102.58 7983.86 -1908 .65 7752.35 0.37 5976324.62 591144.12 N 70.34503489 W 149.26019751 10513.93 88.02 120.32 4601 .59 4680.19 8012. 96 8134.26 8014.21 -1924 .72 7779.65 1.32 5976308.86 591171.59 N 70.34499092 W 149.25997608 10545.84 87.88 120.53 4602 .73 4681.33 8043. 68 8166.15 8044.79 -1940 .87 7807.15 0.79 5976293.02 591199.27 N 70.34494672 W 149.25975305 10578.04 87.73 118.53 4603 .97 4682.57 8074. 82 8198.32 8075.79 -1956 .73 7835.15 6.22 5976277.47 591227.43 N 70.34490332 W 149.25952598 10610.28 87.84 118.06 4605 .21 4683.81 8106. 16 8230.54 8107.01 -1972 .00 7863.52 1.50 5976262.52 591255.97 N 70.34486152 W 149.25929589 10642.26 89.70 118.11 4605 .90 4684.50 8137. 29 8262.51 8138.04 -1987 .05 7891.72 5.82 5976247.79 591284.34 N 70.34482032 W 149.2 0 10673.87 89.67 118.09 4606 .07 4684.67 8168. 06 8294.12 8168.71 -2001 .94 7919.61 0.11 5976233.21 591312.38 5 N 70.34477956 W 149.25 10705.87 88.32 117.59 4606 .63 4685.23 8199. 25 8326.12 8199.81 -2016. 88 7947.90 4.50 5976218.58 591340.83 N 70.34473866 W 149.25 6 10737.54 89.02 116.23 4607 .37 4685.97 8230. 21 8357.78 8230.70 -2031 .21 7976.13 4.83 5976204.57 591369.22 N 70.34469944 W 149.25838246 10769.21 89.53 116.36 4607 .77 4686.37 8261. 26 8389.44 8261.68 -2045 .24 8004.52 1.66 5976190.86 591397.76 N 70.34466103 W 149.25815217 10800.78 89.62 117.16 4608 .00 4686.60 8292. 15 8421.01 8292.51 -2059. 45 8032.71 2.55 5976176.96 591426.10 N 70:34462211 W 149.25792353 10832.84 89.36 117.93 4608 .29 4686.89 8323. 44 8453.07 8323.73 -2074. 27 8061.13 2.53 5976162.46 591454.69 N 70.34458153 W 149.25769298 10864.85 89.40 118.33 4608 .64 4687.24 8354. 60 8485.08 8354.83 -2089. 37 8089.36 1.26 5976147.68 591483.08 N 70.34454022 W 149.25746403 10896.88 89.00 121.03 4609 .08 4687.68 8385. 56 8517.11 8385.74 -2105. 22 8117.18 8.52 5976132.14 591511.07 N 70.34449682 W 149.25723837 10929.33 89.12 120.56 4609. 62 4688.22 8416. 77 8549.55 8416.89 -2121. 83 8145.05 1.49 5976115.84 591539.13 N 70.34445136 W 149.25701232 10961.16 89.05 121.38 4610 .12 4688.72 8447. 35 8581.38 8447.43 -2138. 21 8172.34 2.59 5976099.77 591566.59 N 70.34440653 W 149.25679101 10992.76 89.24 122.98 4610 .60 4689.20 8477. 52 8612.97 8477.57 -2155. 04 8199.08 5.10 5976083.24 591593.52 N 70.34436048 W 149.25657413 11024.67 89.98 120.92 4610. 81 4689.41 8508. 03 8644.88 8508.05 -2171. 92 8226.16 6.86 5976066.66 591620.77 N 70.34431428 W 149.25635457 11057.31 90.25 117.01 4610. 75 4689.35 8539. 69 8677.52 8539.69 -2187. 73 8254.71 12.01 5976051.18 591649.50 N 70.34427102 W 149.25612300 11088.09 90.40 115.72 4610. 57 4689.17 8569. 85 8708.30 8569.85 -2201. 39 8282.28 4.22 5976037.82 591677.22 N 70.34423359 W 149.25589931 11120.84 90.81 114.47 4610 .23 4688.83 8602. 08 8741.05 8602.08 -2215. 28 8311.94 4.02 5976024.26 591707.03 N 70.34419556 W 149.25565876 11152.85 89.72 112.37 4610 .08 4688.68 8633. 74 8773.06 8633.74 -2228. 01 8341.31 7.39 5976011.87 591736.54 N 70.34416072 W 149.25542052 11184.36 88.48 109.02 4610 .57 4689.17 8665. 08 8804.57 8665.09 -2239. 14 8370.78 11.33 5976001.06 591766.12 N 70.34413021 W 149.25518147 11248.72 87.40 103.09 4612 .89 4691.49 8729. 35 8868.88 8729.36 -2256. 92 8432.56 9.36 5975983.97 591828.09 N 70.34408145 W 149.25 6 11280.37 86.39 99.88 4614 .60 4693.20 8760. 90 8900.49 8760:90 -2263. 21 8463.53 10.62 5975978.03 591859.12 4 N 70.34406416 W 149.25 1 11312.25 89.16 99.65 4615 .84 4694.44 8792. 62 8932.34 8792.62 -2268 .61 8494.92 8.72 5975972.97 591890.57 N 70.34404931 W 149.25417430 11344.47 88.16 100.16 4616 .60 4695.20 8824. 71 8964.55 8824.71 -2274 .15 8526.65 3.48 5975967.79 591922.36 N 70.34403407 W 149.25391685 11375.65 85.75 100.31 4618 .25 4696.85 8855. 74 8995.68 8855.74 -2279 .69 8557.29 7.74 5975962.60 591953.05 N 70.34401887 W 149.25366825 11407.65 88.00 100.85 4620 .00 4698.60 8887. 60 9027.63 8887.60 -2285 .55 8588.69 7.23 5975957.08 591984.52 N 70.34400274 W 149.25341342 11440.04 88.15 99.41 4621 .08 4699.68 8919. 86 9060.01 8919.86 -2291 .25 8620.56 4.47 5975951.74 592016.45 N 70.34398709 W 149.25315487 11471.41 89.85 101.85 4621 .63 4700.23 8951 .13 9091.37 8951.13 -2297 .03 8651.38 9.48 5975946.30 592047.33 N 70.34397118 W 149.25290478 11503.47 87.95 101.96 4622 .25 4700.85 8983 .14 9123.42 8983.14 -2303 .64 8682.75 5.94 5975940.04 592078.76 N 70.34395302 W 149.25265032 11534.69 87.22 103.04 4623 .56 4702.16 9014 .30 9154.61 9014.31 -2310 .39 8713.20 4.17 5975933.63 592109.28 N 70.34393448 W 149.25240325 11566.68 87.85 103.88 4624 .94 4703.54 9046. 25 9186.57 9046.26 -2317 .83 8744.28 3.28 5975926.54 592140.44 N 70.34391406 W 149.25215108 11598.62 88.06 104.88 4626 .08 4704.68 9078. 17 9218.49 9078.18 -2325 .76 8775.20 3.20 5975918.95 592171.45 N 70.34389231 W 149.25190023 11630.17 88.85 104.93 4626 .93 4705.53 9109 .71 9250.03 9109.72 -2333 .87 8805.68 2.51 5975911.18 592202.01 N 70.34387005 W 149.25165298 SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204\L-204 Generated 10/2/2006 12:57 PM Page 6 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS llbbL.4/ tl/.5:i lU3.tiL 4b'L/.yb 4/Ut).55 y141.yy yLt5L.:iL y14L.UU -L:i41.23:i 2525;Sb.`Jti 5./b 5y/5yU3.5/ 11693.90 87.87 105.28 4629.21 4707.81 9173.39 9313.72 9173.40 -2349.67 8867.37 5.39 5975896.07 11725.75 87.08 105.39 4630.61 4709.21 9205.21 9345.54 9205.22 -2358.08 8898.06 2.50 5975888.00 11757.75 87.08 105.27 4632.24 4710.84 9237.17 9377.50 9237.17 -2366.53 8928.88 0.37 5975879.90 11789.82 86.89 104.93 4633.93 4712.53 9269.19 9409.52 9269.20 -2374.88 8959.80 1.21 5975871.90 11821.49 87.04 106.05 4635.61 4714.21 9300.82 9441.15 9300.82 -2383.32 8990.28 3.56 5975863.79 11852.84 87.38 105.64 4637.13 4715.73 9332.13 9472.46 9332.13 -2391.87 9020.40 1.70 5975855.58 11885.20 87.32 105.98 4638.63 4717.23 9364.45 9504.79 9364.45 -2400.68 9051.50 1.07 5975847.12 Last MWD+IFR+MS 11916.80 86.53 104.60 4640.33 4718.93 9396.00 9536.34 9396.00 -2409.00 9081.94 5.03 5975839.14 TD (Projected) 11965.00 86.53 104.60 4643.24 4721.84 9444.11 9584.45 9444.12 -2421.13 9128.50 0.00 5975827.53 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots --Gyrodata gyro orientation surveys. Not to be run above 70 degrees incli nation. ) MWD +IFR + MS - (In-field referenced MWD with mull-stat ion analysis and correct ion applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Descriation: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 2423 FSL 3544 FEL S34 T12N R11 E UM 5978146.73 583371.74 BHL : 5276 FSL 4980 FEL S1 T11 N R11 E UM 5975827.53 592525.75 5y'L'L:ii.:Stf N /U.:S4:Sif4tfLU VV 14y.Cb1:S`J`Jlti 592263.87 N 70.34382669 W 149.25115244 592294.64 N 70.34380360 W 149.25090350 592325.56 N 70.34378042 W 149.25065346 592356.56 N 70.34375753 W 149.25040261 592387.13 N 70.34373436 W 149.25015537 592417.34 N 70.34371090 W 149.24991100 592448.54 N 70.34368674 W 149.24965867 592479.06 N 70.34366391 W 149.24941176 592525.75 N 70.34363062 W 149.24903404 r 1 ~J • SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204\L-204 Generated 10/2/2006 12:57 PM Page 7 of 7 TREE = FMC 41/8" 5M WF~LHEAD = FMC GEN 5 ACTUATOR = LEO KB. ELEV = 78.6' BF. ELEV = KOR = Max Angle= 50.1' 700 95 @6583' Datum MD = 6142 Datum TVD = 4478' SS L-2 L-20 L-204 L2 L-204 L3 L-204 L4 (20" CONDUCTOR 11 109' I 10-314" CSG. 45.5 L-80, ID = 9.95" 3457' 4.5"PHOENIX DSCHRGE-PRESS SUB,ID = 3.948" 5758' 14.5" PHNIX MULTI-PRESS SENSOR. ID = 3.994" !-I 5790' RA TAG 5881' L _~ O ~ S ° °° °Y,N~OTES: FRQ -~?t'~:LV - D FT 2191' 4-112" HES X NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TV D DEV TYPE V LV LATCH PORT DATE 4 3011 2491 50 KBG-2 DMY SBK 0 09101/06 3 4590 3508 51 KBG-2 DMY SBK 0 09f01f06 2 5538 4116 49 KBG-2 DMY SBK 0 09f01f06 1 5648 4189 49 KBG-2 DCK2 BEK 0 09101106 5769' 4.5" Baker CMD-BXSliding Sleeee, 3.812" ID 5812' 7.625" x 4.5" Premier Packer 3.87" ID 5839' 4.5" HES Xnipple W/ RHGM Plug, ID 3.813" 5860' 4.5" HES X nipple, ID 3.813" 5886' 4.5" Guide Shoe 7-518" x 5.5" BKR ZXP PACKER, ID = 4.95" 5$7$' Seal Assembly from LEM#3 6035' L4 BKR HUGHES HOOK HGR, ID = 5.63" 5925' Minimum ID = 3.688" @ 5925', 6059' & 6165' - LEM's RA TAG 601$' 7-5(8" x 5.5" BKR ZXP PACKER, ID = 4.82" 6003' Seal Assembly from LEM#2 6022' L3 BKR HUGHES HOOK HGR, ID = 5.62" 6059' RA TAG I'-1 6115' 7-5/8" x 5.5" BKR Z~(P PACKER, ID = 4.82" 6108' Seai Assembly from LEM#1 6127' L2 BKR HUGHES HOOK HGR, ID = 5.62" 6165' 7-5/8" x 5.5" BKR ZXP PKR w/10.74' TIEBACK 6229' 7-518" x 5.5" BKR HMC HANGER, ID = 4.81" 6250' RA TAG '-"I 6380' 7-5(8" CSG. 29.7 L-80, ID = 6.875" 6670' 4" x 6.4" Swell Packer 3.9" ID 7123'-7133' 4.5" 12.6# L-80 BTC Slotted (3.958" 1D) 7233'-9411' 4" x 6.4" Swell Packer 3.9" ID 9431'3441' 4" x 6.4" Swell Packer 3.9" ID 9850'-9860' 4.5" 12.6# L-80 BTC Slotted (3.958" ID) 9875-11923 4.5" 12.6# L-80 BTC/IBT Slotted/Solid Liner Shoe (11961' PBTD) - L1 - OBd 11965' 5925'- 5948' H Hookwall Hanger below window - 3.99" ID-L4 OA 5984'- 5974' H 4" x 6.4" Swell Packer 3.9" ID-L4-OA 6467'- 6456' H 4" x 6.4" Swell Packer 3.9" ID-L40A 8443'-6498' I-14.5" L-80 12.6# BTC Slotted Liner 3.958" ID-L4-OA 8474'-8464' I-14" x 6.4" Swell Packer 3.9" ID-L4-OA 8944'- 8934' I-14" x 6.4" Swell Packer 3.9" ID-L4-OA 1183T- 8968' I-14.5" L-80 12.6# BTC Slotted Liner 3.958" ID-L4-OA 11877_ H 4.5" 12.6# L-80 IBT-M shoe (10,574' PBTD}L4-OA _ r-~--- - --~---~ 6076'- 6082' Hookwall Hanger below window - 3.99" ID - L3 Oba 6124'- 6114' 4" x 6.4" Swell Packer 3.9" ID-L3-Oba 6497'- 6487' 4" x 6.4" Swell Packer 3.9" ID-L3-Oba 9709'- 6537 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID L3-Oba 9904'- 9894' 4" x 6.4" Swell Packer 3.9" ID-L3-Oba 11869'-1012T 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID L3-Oba 11,912' 4.5" 12.6# L-80 IBT-M shoe (11,912' PBTD}L3-OBa 7 ^ 61823188 Hookwall Hanger below window - 3.99" ID-L2 -OBb 6256.6266 4" x 6.4" Swell Packer 3.9" ID-L2-OBb 6282-11889 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID-L2-OBb 11891' 4.5" 12.6# L-80 IBT-M shoe (11889' PBTD}L2-OBb i r 7018' Weatherford Flow Through Aluminum Billet (partially milled while drilling L1) - MB OBc 7055'-7065' 4" x 6.4" Swell Packer 3.9" ID - MB OBc 7065'-7451' 4.5" 12.6# L-80 IBT solid (3.958" ID} - MB OBc 7451'-11961' 4.5" 12.6# L-80 BTC slotted (3.958" ID) - MB OBc 11963' 4.5" 12.6# L-80 BTC shoe (11961' PBTD) -MB-Obc DATE REV BY COMMENTS DATE REV BY COMMENTS 09/03/06 9ES ORIGINAL COMPLETION 09!04106 JDM/PAG DRLG DRAFT CORRECTIONS ORION UNff WELL: L-204, L1, L2, L3, L4 PERMfT No: 206-092 (093) (094) (095) (096) AR No: 50-029-23314-00 (60) (61) (62) (63) SEC 34, T12N, R11 E, 2423' NSL & 3544' WEL BP Exploration (Alaska) O' G' r' SCHLUMBERGER Survey report Client ...................: BP Exploration (Alaska) Inc. Field ....................: Orion Well ...................... L-204 API number ...............: 50-029-23314-00 Engineer .................. St. Amour RIG :...................... Nabors 9ES STATE :.................... Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Pipe tally GL above permanent.......: 48.75 ft KB above permanent.......: N/A (Topdrive) DF above permanent.......: 78.60 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 104.91 degrees 1-Aug-2006 11:27:41 Page 1 of 9 Spud date ................: 16-Jul-06 Last survey date.........: O1-Aug-06 Total accepted surveys...: 237 MD of first survey.......: 0.00 ft MD of last survey........: 11965.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2005 Magnetic date ............: 16-Jul-2006 Magnetic field strength..: 57579.68 LAMA Magnetic dec (+E/W-).....: 24.17 degrees Magnetic dip .............: 80.86 degrees ----- MWD survey Reference Reference G ..............: Reference H ..............: Reference Dip ............: Tolerance of G...........: Tolerance of H...........: Tolerance of Dip.........: Criteria --------- 1002.68 meal 57579.50 GAMA 80.86 degrees (+/-) 2.50 meal (+/-)300.00 GAMA (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 24.17 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 24.17 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction • • SCHLUMBERGER Survey Report 1-Aug-2006 11:27:41 Page 2 of 9 Seq Measured Intl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (f t) (ft) (deg) 100f) type (deg) 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 100.00 0.85 12.39 100.00 100.00 -0.03 0.72 0.16 0.74 12.39 0.85 BP _GYD CT DMS 3 166.00 1.26 13.33 66.00 165.99 -0.07 1.91 0.43 1.96 12.74 0.62 BP GYD CT DMS 4 261.00 1.00 28.99 95.00 260.97 0.10 3.65 1.07 3.80 16.40 0.42 BP _GYD CT DMS 5 351.00 1.31 131.89 90.00 350.96 1.21 3.65 2.22 4.27 31.31 2.02 BP GYD CT DMS 6 443.00 4.58 153.98 92.00 442.82 4.55 -0.35 4.62 4.63 94.39 3.70 BP _GYD CT DMS • 7 533.00 6.02 158.29 90.00 532.44 9.72 -7.97 7.94 11.25 135.11 1.66 BP _GYD CT DMS 8 626.00 7.28 140.25 93.00 624.82 17.44 -17.03 13.51 21.74 141.57 2.61 BP _GYD CT DMS 9 720.00 8.24 132.06 94.00 717.96 28.29 -26.12 22.32 34.36 139.49 1.56 BP _GYD CT DMS 10 813.00 8.53 135.67 93.00 809.97 40.15 -35.52 32.09 47.87 137.91 0.65 BP GYD CT DMS 11 875.00 9.83 127.28 62.00 871.17 48.99 -42.02 39.51 57.68 136.76 3.00 BP _GYD CT DMS 12 941.45 11.66 111.02 66.45 936.47 60.92 -47.86 50.30 69.43 133.58 5.30 BP _MWD+IFR+MS 13 1037.16 15.11 111.81 95.71 1029.57 82.93 -55.97 70.91 90.34 128.28 3.61 BP _MWD+IFR+MS 14 1132.97 19.34 108.37 95.81 1121.06 111.17 -65.61 97.58 117.59 123.92 4.54 BP _MWD+IFR+MS 15 1229.64 23.03 106.69 96.67 1211.18 146.06 -76.09 130.89 151.40 120.17 3.87 BP MWD+IFR+MS 16 1324.32 25.69 102.66 94.68 1297.43 185.09 -85.91 168.67 189.28 116.99 3.31 BP MWD+IFR+MS 17 1420.06 30.67 99.73 95.74 1381.80 230.18 -94.59 213.01 233.07 113.94 5.40 BP _MWD+IFR+MS 18 1515.04 36.39 97.47 94.98 1460.95 282.28 -102.36 264.87 283.96 111.13 6.16 BP MWD+IFR+MS 19 1610.55 42.03 95.77 95.51 1534.92 341.99 -109.26 324.82 342.70 108.59 6.01 BP MWD+IFR+MS 20 1711.65 40.01 95.64 101.10 1611.20 407.49 -115.86 390.84 407.65 106.51 2.00 BP MWD+IFR+MS 21 1807.00 41.19 96.35 95.35 1683.59 468.79 -122.34 452.55 468.80 105.13 1.33 BP _MWD+IFR+MS 22 1902.84 39.77 96.73 95.84 1756.49 530.34 -129.42 514.36 530.39 104.12 1.50 BP _MWD+IFR+MS 23 1998.47 41.97 96.35 95.63 1828.80 592.25 -136.55 576.53 592.48 103.32 2.32 BP _MWD+IFR+MS 24 2094.14 44.85 96.05 95.67 1898.29 657.23 -143.64 641.88 657.76 102.61 3.02 BP _MWD+IFR+MS 25 2189.87 47.22 96.54 95.73 1964.75 725.35 -151.20 710.36 726.28 102.02 2.50 BP MWD+IFR+MS 26 2285.57 50.89 96.76 95.70 2027.45 796.87 -159.58 782.15 798.26 101.53 3.84 BP _MWD+IFR+MS 27 2381.11 49.73 96.68 95.54 2088.47 869.64 -168.18 855.16 871.54 101.13 1.22 BP _MWD+IFR+MS 28 2477.10 50.42 96.89 95.99 2150.07 942.52 -176.88 928.26 944.96 100.79 0.74 BP MWD+IFR+MS 29 2572.36 51.15 96.59 95.26 2210.30 1015.57 -185.54 1001.55 1018.59 100.50 0.80 BP _MWD+IFR+MS 30 2668.18 49.72 96.60 95.82 2271.33 1088.66 -194.02 1074.93 1092.30 100.23 1.49 BP MWD+IFR+MS SCHLUMBERGER Survey Report 1-Aug-2006 11:27:41 Page 3 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (f t) (ft) (ft) (f t) (ft) (deg) 100f) type (deg) 31 2764.00 50.25 96.37 95.82 2332.94 1161.25 -202.31 1147.85 1165.54 100.00 0.58 BP _MWD+IFR+MS 32 2859.46 50.30 96.81 95.46 2393.95 1233.90 -210.73 1220.78 1238.84 99.79 0.36 BP _MWD+IFR+MS 33 2954.76 50.37 96.20 95.30 2454.78 1306.47 -219.05 1293.67 1312.08 99.61 0.50 BP _MWD+IFR+MS 34 3050.79 50.20 96.28 96.03 2516.14 1379.50 -227.07 1367.10 1385.83 99.43 0.19 BP _MWD+IFR+MS 35 3146.15 49.93 96.13 95.36 2577.35 1451.78 -234.98 1439.79 1458.84 99.27 0.31 BP MWD+IFR+MS 36 3241.60 50.12 96.26 95.45 2638.67 1524.08 -242.87 1512.51 1531.89 99.12 0.22 BP _MWD+IFR+MS 37 3337.25 50.04 96.54 95.65 2700.05 1596.63 -251.05 1585.41 1605.17 99.00 0.24 BP - MWD+TFR+MS 38 3412.18 49.40 96.45 74.93 2748.50 1653.18 -257.51 1642.21 1662.28 98.91 0.86 BP _MWD+IFR+MS 39 3510.50 49.38 95.86 98.32 2812.50 1726.95 -265.52 1716.42 1736.83 98.79 0.46 BP _MWD+IFR+MS 40 3606.56 48.75 97.03 96.06 2875.44 1798.72 -273.66 1788.53 1809.34 98.70 1.13 BP MWD+IFR+MS 41 3701.74 49.73 96.79 95.18 2937.58 1870.11 -282.33 1860.09 1881.40 98.63 1.05 BP _MWD+IFR+MS 42 3797.81 51.14 95.12 96.07 2998.77 1943.26 -290.00 1933.75 1955.38 98.53 1.99 BP _MWD+IFR+MS 43 3893.70 50.93 93.93 95.89 3059.07 2016.60 -295.89 2008.07 2029.76 98.38 0.99 BP _MWD+IFR+MS 44 3989.02 50.62 94.78 95.32 3119.35 2089.19 -301.49 2081.70 2103.42 98.24 0.76 BP _MWD+IFR+MS 45 4084.90 50.09 94.60 95.88 3180.52 2161.84 -307.53 2155.28 2177.11 98.12 0.57 BP MWD+IFR+MS 46 4180.57 49.73 94.27 95.67 3242.13 2233.81 -313.19 2228.25 2250.15 98.00 0.46 BP _MWD+IFR+MS 47 4276.33 49.24 94.88 95.76 3304.34 2305.43 -319.00 2300.82 2322.83 97.89 0.70 BP _MWD+IFR+MS 48 4371.36 49.19 95.48 95.03 3366.42 2376.35 -325.49 2372.48 2394.70 97.81 0.48 BP _MWD+IFR+MS 49 4467.82 48.78 95.70 96.46 3429.72 2448.17 -332.58 2444.92 2467.43 97.75 0.46 BP _MWD+IFR+MS 50 4562.97 50.82 95.77 95.15 3491.14 2519.91 -339.84 2517.22 2540.06 97.69 2.14 BP MWD+IFR+MS 51 4658.78 51.00 96.65 95.81 3551.55 2593.42 -347.89 2591.15 2614.40 97.65 0.74 BP _MWD+IFR+MS • 52 4754.14 51.01 96.40 95.36 3611.55 2666.74 -356.31 2664.78 2688.50 97.62 0.20 BP _MWD+IFR+MS 53 4849.66 50.93 96.02 95.52 3671.71 2740.09 -364.34 2738.55 2762.68 97.58 0.32 BP _MWD+IFR+MS 54 4944.97 50.49 96.74 95.31 3732.06 2813.04 -372.53 2811.86 2836.43 97.55 0.74 BP _MWD+IFR+MS 55 5041.18 50.39 96.73 96.21 3793.33 2886.46 -381.23 2885.52 2910.59 97.53 0.10 BP MWD+IFR+MS 56 5136.35 50.47 97.34 95.17 3853.96 2959.13 -390.22 2958.33 2983.95 97.51 0.50 BP _MWD+IFR+MS 57 5232.61 49.20 96.26 96.26 3916.05 3031.95 -398.93 3031.37 3057.50 97.50 1.57 BP _MWD+IFR+MS 58 5328.23 49.07 96.29 95.62 3978.61 3103.44 -406.84 3103.24 3129.80 97.47 0.14 BP _MWD+IFR+MS 59 5424.12 48.71 96.65 95.89 4041.66 3174.91 -414.98 3175.03 3202.04 97.45 0.47 BP _MWD+IFR+MS 60 5518.74 49.22 97.66 94.62 4103.78 3245.63 -423.87 3245.85 3273.41 97.44 0.97 BP MWD+IFR+MS SCHLUMBERGER Survey Report 1-Aug-2006 11:27:41 Page 4 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (f t) (deg) 100f) type (deg) 61 5615.31 48.55 96.33 96.57 4167.28 3317.68 -432.73 3318.06 3346.16 97.43 1.25 BP _MWD+IFR+MS 62 5710.48 48.46 95.99 95.17 4230.34 3388.14 -440.38 3388.93 3417.42 97.40 0.28 BP _MWD+IFR+MS 63 5806.66 50.16 96.26 96.18 4293.04 3460.21 -448.17 3461.44 3490.33 97.38 1.78 BP _MWD+IFR+MS 64 5902.52 54.11 97.19 95.86 4351.87 3535.10 -457.04 3536.58 3565.99 97.36 4.19 BP _MWD+IFR+MS 65 5998.04 57.10 96.96 95.52 4405.82 3613.18 -466.75 3614.79 3644.80 97.36 3.14 BP MWD+IFR+MS 66 6093.30 60.36 95.81 95.26 4455.26 3693.68 -475.79 3695.69 3726.19 97.34 3.57 BP _MWD+IFR+MS 67 6188.96 64.30 95.67 95.66 4499.68 3777.30 -484.25 3779.97 3810.86 97.30 4.12 BP _MWD+IFR+MS 68 6284.50 68.00 94.93 95.54 4538.30 3863.44 -492.32 3866.96 3898.18 97.26 3.94 BP _MWD+IFR+MS 69 6380.10 71.61 95.88 95.60 4571.30 3951.92 -500.78 3956.27 3987.84 97.21 3.89 BP _MWD+IFR+MS 70 6475.79 75.92 97.30 95.69 4598.05 4042.80 -511.33 4047.51 4079.68 97.20 4.72 BP MWD+IFR+MS 71 6571.26 79.79 100.39 95.47 4618.13 4135.59 -525.69 4139.70 4172.95 97.24 5.14 BP _MWD+IFR+MS 72 6605.15 82.11 101.65 33.89 4623.46 4168.97 -532.09 4172.55 4206.34 97.27 7.77 BP _MWD+IFR+MS 73 6691.45 83.29 99.14 86.30 4634.43 4254.30 -547.53 4256.74 4291.81 97.33 3.19 BP _Inc+Trend 74 6723.45 85.22 103.21 32.00 4637.63 4286.06 -553.70 4287.97 4323.57 97.36 14.02 BP _Inc+Trend 75 6754.80 89.27 104.77 31.35 4639.14 4317.37 -561.27 4318.34 4354.67 97.41 13.84 BP MWD+IFR+MS 76 6789.83 89.71 107.94 35.03 4639.45 4352.38 -571.14 4351.95 4389.27 97.48 9.14 BP _MWD+IFR+MS 77 6821.68 89.66 109.85 31.85 4639.63 4384.15 -581.45 4382.08 4420.49 97.56 6.00 BP _MWD+IFR+MS 78 6849.89 89.50 110.09 28.21 4639.84 4412.25 -591.08 4408.59 4448.04 97.64 1.02 BP _MWD+IFR+MS 79 6881.26 89.50 109.90 31.37 4640.11 4443.49 -601.81 4438.07 4478.69 97.72 0.61 BP _MWD+IFR+MS 80 6913.87 89.80 110.56 32.61 4640.31 4475.96 -613.08 4468.67 4510.53 97.81 2.22 BP MWD+IFR+MS 81 6946.09 89.75 110.46 32.22 4640.44 4508.03 -624.37 4498.85 4541.97 97.90 0.35 BP _MWD+IFR+MS 82 6978.60 89.65 110.23 32.51 4640.61 4540.39 -635.68 4529.33 4573.72 97.99 0.77 BP _MWD+IFR+MS 83 7010.27 89.59 110.35 31.67 4640.82 4571.92 -646.66 4559.03 4604.67 98.07 0.42 BP _MWD+IFR+MS 84 7042.47 89.34 110.39 32.20 4641.12 4603.98 -657.87 4589.22 4636.13 98.16 0.79 BP _MWD+IFR+MS 85 7074.37 89.13 110.51 31.90 4641.54 4635.72 -669.01 4619.11 4667.30 98.24 0.76 BP MWD+IFR+MS 86 7105.82 88.86 110.36 31.45 4642.09 4667.02 -679.99 4648.57 4698.04 98.32 0.98 BP _MWD+IFR+MS 87 7138.50 90.34 111.31 32.68 4642.32 4699.52 -691.61 4679.11 4729.95 98.41 5.38 BP _MWD+IFR+MS 88 7170.45 94.83 112.94 31.95 4640.88 4731.18 -703.63 4708.67 4760.95 98.50 14.95 BP _MWD+IFR+MS 89 7202.13 98.76 113.24 31.68 4637.13 4762.31 -715.96 4737.60 4791.40 98.59 12.44 BP _MWD+IFR+MS 90 7234.00 99.74 112.86 31.87 4632.01 4793.45 -728.28 4766.55 4821.86 98.69 3.29 BP MWD+IFR+MS • • SCHLUMBERGER Survey Report 1-Aug-2006 11:27:41 Page 5 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (f t) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 7265.65 97.83 111.91 31.65 4627.18 4824.46 -740.19 4795.47 4852.26 98.77 6.72 BP _MWD+IFR+MS 92 7298.30 97.74 111.58 32.65 4622.75 4856.58 -752.17 4825.51 4883.78 98.86 1.04 BP _MWD+IFR+MS 93 7329.51 98.25 111.33 31.21 4618.41 4887.29 -763.48 4854.28 4913.95 98.94 1.82 BP _MWD+IFR+MS 94 7361.39 99.04 111.90 31.88 4613.62 4918.59 -775.09 4883.58 4944.71 99.02 3.04 BP _MWD+IFR+MS 95 7392.86 97.21 112.19 31.47 4609.17 4949.50 -786.78 4912.46 4975.06 99.10 5.89 BP MWD+IFR+MS 96 7425.20 95.12 114.04 32.34 4605.70 4981.32 -799.40 4942.02 5006.26 99.19 8.61 BP _MWD+IFR+MS • 97 7457.09 95.01 113.84 31.89 4602.89 5012.69 -812.29 4971.06 5036.99 99.28 0.71 BP _MWD+IFR+MS 98 7488.93 94.68 113.97 31.84 4600.20 5044.03 -825.15 5000.06 5067.69 99.37 1.11 BP _MWD+IFR+MS 99 7521.12 94.64 114.10 32.19 4597.58 5075.70 -838.22 5029.36 5098.73 99.46 0.42 BP _MWD+IFR+MS 100 7552.26 94.58 114.29 31.14 4595.08 5106.34 -850.94 5057.68 5128.76 99.55 0.64 BP MWD+IFR+MS 101 7584.54 92.58 112.88 32.28 4593.06 5138.18 -863.83 5087.20 5160.02 99.64 7.58 BP _MWD+IFR+MS 102 7616.30 89.71 112.05 31.76 4592.43 5169.66 -875.96 5116.54 5190.98 99.71 9.41 BP _MWD+IFR+MS 103 7648.32 87.89 112.59 32.02 4593.10 5201.40 -888.12 5146.15 5222.23 99.79 5.93 BP _MWD+IFR+MS 104 7680.03 87.74 111.83 31.71 4594.31 5232.83 -900.09 5175.49 5253.18 99.87 2.44 BP _MWD+IFR+MS 105 7711.94 88.22 113.41 31.91 4595.43 5264.43 -912.36 5204.92 5284.28 99.94 5.17 BP MWD+IFR+MS 106 7743.70 88.75 114.01 31.76 4596.27 5295.81 -925.13 5233.99 5315.12 100.02 2.52 BP _MWD+IFR+MS 107 7775.27 88.71 113.94 31.57 4596.97 5326.98 -937.95 5262.83 5345.76 100.11 0.26 BP _MWD+IFR+MS 108 7806.85 88.24 114.06 31.58 4597.81 5358.15 -950.79 5291.67 5376.41 100.19 1.54 BP _MWD+IFR+MS 109 7838.36 87.67 113.98 31.51 4598.94 5389.24 -963.61 5320.43 5406.99 100.27 1.83 BP _MWD+IFR+MS 110 7870.52 88.68 116.43 32.16 4599.96 5420.86 -977.30 5349.51 5438.05 100.35 8.24 BP MWD+IFR+MS 111 7902.47 89.55 116.74 31.95 4600.45 5452.15 -991.59 5378.08 5468.73 100.45 2.89 BP _MWD+IFR+MS • 112 7933.80 89.59 116.59 31.33 4600.69 5482.82 -1005.65 5406.08 5498.82 100.54 0.50 BP _MWD+IFR+MS 113 7965.98 89.51 116.84 32.18 4600.94 5514.32 -1020.12 5434.82 5529.73 100.63 0.82 BP _MWD+IFR+MS 114 7997.83 88.78 116.39 31.85 4601.42 5545.50 -1034.39 5463.30 5560.36 100.72 2.69 BP _MWD+IFR+MS 115 8029.80 88:14 115.75 31.97 4602.28 5576.86 -1048.43 5492.00 5591.18 100.81 2.83 BP MWD+IFR+MS 116 8062.07 90.09 116.38 32.27 4602.78 5608.51 -1062.61 5520.98 5622.31 100.89 6.35 BP _MWD+IFR+MS 117 8092.97 89.90 115.49 30.90 4602.78 5638.84 -1076.12 5548.77 5652.16 100.98 2.95 BP _MWD+IFR+MS 118 8124.84 90.01 115.66 31.87 4602.80 5670.16 -1089.88 5577.52 5683.01 101.06 0.64 BP _MWD+IFR+MS 119 8156.62 88.39 113.92 31.78 4603.25 5701.46 -1103.20 5606.37 5713.88 101.13 7.48 BP _MWD+IFR+MS 120 8188.93 88.16 114.35 32.31 4604.22 5733.34 -1116.41 5635.84 5745.35 101.20 1.51 BP MWD+IFR+MS SCHLUMBEI2GER Survey Report 1-Aug-2006 11:27:41 Page 6 of 9 --- Seq -------- Measured ------ Incl ------- Azimuth ------ Course -------- TVD -------- Vertical -------- Displ - - Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (f t) (ft) (ft) (ft) (deg) 100f) type (deg) 121 8220 54 88.41 113.90 31.61 4605.17 5764.53 -1129.32 5664.67 5776.15 101.27 1.63 BP_ MWD+IFR+MS 122 8252.44 87.90 113.82 31.90 4606.19 5796.02 -1142.22 5693.83 5807.27 101.34 1.62 BP_ MWD+IFR+MS 123 8283.50 88.17 114.40 31.06 4607.26 5826.67 -1154.90 5722.17 5837.55 101.41 2.06 BP_ MWD+IFR+MS 124 8314.91 88.54 113.51 31.41 4608.16 5857.67 -1167.65 5750.86 5868.20 101.48 3.07 BP_ MWD+IFR+MS 125 8346.81 88.59 112.30 31.90 4608.96 5889.25 -1180.06 5780.23 5899.46 101.54 3.80 BP_ MWD+IFR+MS 126 8378.73 88.81 109.41 31.92 4609.68 5920.99 -1191.42 5810.05 5930.95 101.59 9.08 BP MWD+IFR+MS 127 8410.09 87.80 106.36 31.36 4610.61 5952.29 -1201.04 5839.88 5962.10 101.62 10.24 BP - MWD+IFR+MS • 128 8442.67 89.54 102.91 32.58 4611.37 5984.85 -1209.27 5871.39 5994.63 101.64 11.86 BP _MWD+IFR+MS 129 8474.38 87.05 99.32 31.71 4612.31 6016.47 -1215.38 5902.48 6026.31 101.64 13.77 BP _MWD+IFR+MS 130 8505.51 88.68 98.63 31.13 4613.47 6047.41 -1220.23 5933.21 6057.39 101.62 5.69 BP _MWD+IFR+MS 131 8538.09 88.13 97.66 32.58 4614.38 6079.75 -1224.85 5965.45 6089.89 101.60 3.42 BP_ MWD+IFR+MS 132 8570.41 86.92 97.75 32.32 4615.77 6111.79 -1229.18 5997.44 6122.11 101.58 3.75 BP_ MWD+IFR+MS 133 8601.58 86.85 97.13 31.17 4617.47 6142.65 -1233.21 6028.31 6153.15 101.56 2.00 BP_ MWD+IFR+MS 134 8633.27 87.53 99.16 31.69 4619.02 6174.07 -1237.69 6059.64 6184.74 101.54 6.75 BP_ MWD+IFR+MS 135 8665.72 87.62 99.83 32.45 4620.39 6206.35 -1243.04 6091.61 6217.14 101.53 2.08 BP_ MWD+IFR+MS 136 8697.44 88.77 99.92 31.72 4621.39 6237.93 -1248.48 6122.85 6248.84 101.52 3.64 BP_ MWD+IFR+MS 137 8728.97 89.09 101.10 31.53 4621.98 6269.36 -1254.23 6153.84 6280.35 101.52 3.88 BP _MWD+IFR+MS 138 8760.50 87.51 100.35 31.53 4622.92 6300.79 -1260.09 6184.81 6311.87 101.52 5.55 BP _MWD+IFR+MS 139 8792.13 87.00 99.79 31.63 4624.43 6332.27 -1265.62 6215.91 6343.45 101.51 2.39 BP _MWD+IFR+MS 140 8824.49 88.32 100.89 32.36 4625.75 6364.50 -1271.42 6247.72 6375.77 101.50 5.31 BP MWD+IFR+MS 141 8856.41 89.05 101.16 31.92 4626.48 6396.34 -1277.52 6279.04 6407.69 101.50 2.44 BP _MWD+IFR+MS • 142 8888.37 88.80 101.53 31.96 4627.08 6428.23 -1283.81 6310.37 6439.64 101.50 1.40 BP _MWD+IFR+MS 143 8920.31 88.42 101.53 31.94 4627.86 6460.11 -1290.19 6341.66 6471.57 101.50 1.19 BP _MWD+IFR+MS 144 8951.93 87.20 99.87 31.62 4629.07 6491.62 -1296.06 6372.70 6503.16 101.50 6.51 BP _MWD+IFR+MS 145 8983.92 88.85 99.97 31.99 4630.17 6523.47 -1301.56 6404.20 6535.12 101.49 5.17 BP _MWD+IFR+MS 146 9015.59 89.45 99.39 31.67 4630.64 6555.00 -1306.89 6435.41 6566.77 101.48 2.63 BP _MWD+IFR+MS 147 9047.71 89.51 100.24 32.12 4630.93 6586.99 -1312.36 6467.06 6598.88 101.47 2.65 BP _MWD+IFR+MS 148 9079.47 89.10 99.78 31.76 4631.32 6618.64 -1317.88 6498.33 6630.62 101.46 1.94 BP _MWD+IFR+MS 149 9111.40 88.66 99.88 31.93 4631.94 6650.43 -1323.33 6529.79 6662.53 101.46 1.41 BP _MWD+IFR+MS 150 9142.97 87.93 99.35 31.57 4632.88 6681.85 -1328.60 6560.90 6694.07 101.45 2.86 BP _MWD+IFR+MS SCHLUMBERGER Survey Report 1-Aug-2006 11:27:41 Page 7 of 9 --- Seq -------- Measured ------ Incl ------- Azimuth ------ Course -------- TVD -------- Vertical ------- Displ ----- Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (f t) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 151 9174 68 88 08 98 70 31 71 4633.98 6713.38 -1333.58 6592.20 6725.74 101.44 2.10 BP_ MWD+IFR+MS 152 9206.81 88.18 100.17 32.13 4635.03 6745.34 -1338.84 6623.88 6757.83 101.43 4.58 BP_ MWD+IFR+MS 153 9239.10 88.30 99.90 32.29 4636.02 6777.50 -1344.46 6655.66 6790.09 101.42 0.91 BP_ MWD+IFR+MS 154 9271.02 88.08 99.14 31.92 4637.03 6809.26 -1349.74 6687.12 6821.98 101.41 2.48 BP_ MWD+IFR+MS 155 9302.69 88.30 102.56 31.67 4638.03 6840.84 -1355.70 6718.21 6853.63 101.41 10.82 BP_ MWD+IFR+MS 156 9335.03 87.45 104.81 32.34 4639.23 6873.14 -1363.34 6749.60 6885.92 101.42 7.43 BP_ MWD+IFR+MS • 157 9366.94 87.63 107.30 31.91 4640.60 6905.02 -1372.16 6780.24 6917.69 101.44 7.82 BP_ MWD+IFR+MS 158 9399.00 88.85 108.69 32.06 4641.59 6937.01 -1382.06 6810.71 6949.53 101.47 5.77 BP_ MWD+IFR+MS 159 9430.69 87.46 107.23 31.69 4642.61 6968.64 -1391.82 6840.84 6981.00 101.50 6.36 BP_ MWD+IFR+MS 160 9462.46 88.12 110.14 31.77 4643.83 7000.31 -1401.99 6870.91 7012.49 101.53 9.39 BP_ MWD+IFR+MS 161 9494.57 89.04 112.73 32.11 4644.63 7032.20 -1413.72 6900.79 7044.11 101.58 8.56 BP_ MWD+IFR+MS 162 9526.25 88.21 114.27 31.68 4645.39 7063.52 -1426.35 6929.83 7075.10 101.63 5.52 BP_ MWD+IFR+MS 163 9558.13 88.14 113.41 31.88 4646.40 7094.99 -1439.23 6958.98 7106.25 101.68 2.71 BP_ MWD+IFR+MS 164 9589.95 89.47 115.66 31.82 4647.07 7126.36 -1452.44 6987.92 7137.27 101.74 8.21 BP_ MWD+IFR+MS 165 9621.29 89.10 116.35 31.34 4647.46 7157.11 -1466.18 7016.08 7167.64 101.80 2.50 BP_ MWD+IFR+MS 166 9653.96 88.09 115.18 32.67 4648.26 7189.18 -1480.38 7045.49 7199.34 101.87 4.73 BP_ MWD+IFR+MS 167 9685.96 89.08 115.57 32.00 4649.05 7220.64. -1494.09 7074.40 7230.45 101.93 3.33 BP_ MWD+IFR+MS 168 9717.59 89.61 116.77 31.63 4649.41 7251.66 -1508.03 7102.78 7261.11 101.99 4.15 BP _MWD+IFR+MS 169 9749.37 89.95 115.83 31.78 4649.53 7282.81 -1522.11 7131.27 7291.90 102.05 3.15 BP _MWD+IFR+MS 170 9781.51 89.70 118.01 32.14 4649.63 7314.25 -1536.66 7159.93 7322.97 102.11 6.83 BP _MWD+IFR+MS 171 9813.20 87.16 121.33 31.69 4650.50 7344.87 -1552.34 7187.45 7353.17 102.19 13.19 BP _MWD+IFR+MS • 172 9844.97 86.61 122.33 31.77 4652.23 7375.22 -1569.07 7214.40 7383.06 102.27 3.59 BP _MWD+IFR+MS 173 9876.74 85.72 124.50 31.77 4654.35 7405.28 -1586.53 7240.86 7412.63 102.36 7.37 BP _MWD+IFR+MS 174 9908.44 86.28 123.87 31.70 4656.56 7435.13 -1604.30 7267.01 7441.99 102.45 2.66 BP _MWD+IFR+MS 175 9940.35 86.62 125.03 31.91 4658.54 7465.14 -1622.31 7293.28 7471.53 102.54 3.78 BP _MWD+IFR+MS 176 9972.23 86.74 124.18 31.88 4660.39 7495.11 -1640.39 7319.47 7501.04 102.63 2.69 BP _MWD+IFR+MS 177 10004.57 87.04 125.65 32.34 4662.14 7525.45 -1658.87 7345.95 7530.93 102.73 4.63 BP _MWD+IFR+MS 178 10036.56 87.73 126.16 31.99 4663.60 7555.29 -1677.61 7371.84 7560.31 102.82 2.68 BP _MWD+IFR+MS 179 10068.51 88.84 124.02 31.95 4664.56 7585.26 -1695.97 7397.97 7589.87 102.91 7.54 BP _MWD+IFR+MS 180 10099.43 88.92 121.61 30.92 4665.16 7614.67 -1712.72 7423.94 7618.95 102.99 7.80 BP _MWD+IFR+MS SCHLUMBERGER Survey Report 1-Aug-2006 11:27:41 Page 8 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 181 10131.38 90.02 123.22 31.95 4665.46 7645.14 -1729.84 7450.91 7649.08 103.07 6.10 BP _MWD+IFR+MS 182 10162.93 89.64 121.65 31.55 4665.55 7675.23 -1746.76 7477.54 7678.85 103.15 5.12 BP _MWD+IFR+MS 183 10194.94 88.82 119.94 32.01 4665.98 7706.01 -1763.15 7505.03 7709.36 103.22 5.92 BP _MWD+IFR+MS 184 10226.43 86.49 120.32 31.49 4667.27 7736.37 -1778.94 7532.24 7739.47 103.29 7.50 BP _MWD+IFR+MS 185 10258.56 85.64 119.81 32.13 4669.47 7767.31 -1795.00 7559.99 7770.16 103.36 3.08 BP MWD+IFR+MS 186 10290.85 85.49 120.54 32.29 4671.97 7798.36 -1811.18 7587.82 7800.98 103.43 2.30 BP MWD+IFR+MS 187 10322.37 88.34 121.05 31.52 4673.67 7828.63 -1827.29 7614.85 7831.02 103.49 9.18 BP - MWD+IFR+MS 188 10354.19 88.43 120.26 31.82 4674.56 7859.25 -1843.51 7642.21 7861.42 103.56 2.50 BP _MWD+IFR+MS 189 10386.31 88.32 120.27 32.12 4675.47 7890.21 -1859.69 7669.94 7892.18 103.63 0.34 BP _MWD+IFR+MS 190 10417.65 87.97 121.00 31.34 4676.49 7920.36 -1875.66 7696.90 7922.14 103.70 2.58 BP MWD+IFR+MS 191 10450.39 87.64 120.68 32.74 4677.74 7951.82 -1892.43 7724.98 7953.41 103.76 1.40 BP _MWD+IFR+MS 192 10482.23 87.75 120.64 31.84 4679.02 7982.44 -1908.65 7752.35 7983.85 103.83 0.37 BP _MWD+IFR+MS 193 10513.93 88.02 120.32 31.70 4680.19 8012.95 -1924.72 7779.65 8014.21 103.90 1.32 BP _MWD+IFR+MS 194 10545.84 87.88 120.53 31.91 4681.34 8043.68 -1940.87 7807.15 8044.78 103.96 0.79 BP_ MWD+IFR+MS 195 10578.04 87.73 118.53 32.20 4682.57 8074.81 -1956.73 7835.15 8075.78 104.02 6.22 BP MWD+IFR+MS 196 10610.28 87.84 118.06 32.24 4683.81 8106.15 -1972.00 7863.51 8107.01 104.08 1.50 BP _MWD+IFR+MS 197 10642.26 89.70 118.11 31.98 4684.50 8137.28 -1987.05 7891.72 8138.03 104.13 5.82 BP _MWD+IFR+MS 198 10673.87 89.67 118.09 31.61 4684.68 8168.06 -2001.94 7919.60 8168.71 104.19 0.11 BP _MWD+IFR+MS 199 10705.87 88.32 117.59 32..00 4685.24 8199.24 -2016.88 7947.89 8199.80 104.24 4.50 BP _MWD+IFR+MS 200 10737.54 89.02 116.23 31.67 4685.97 8230.21 -2031.21 7976.13 8230.70 104.29 4.83 BP MWD+IFR+MS 201 10769.21 89.53 116.36 31.67 4686.37 8261.25 -2045.24 8004.52 8261.67 104.33 1.66 BP _MWD+IFR+MS 202 10800.78 89.62 117.16 31.57 4686.61 8292.15 -2059.45 8032.70 8292.51 104.38 2.55 BP _MWD+IFR+MS 203 10832.84 89.36 117.93 32.06 4686.89 8323.43 -2074.28 8061.13 8323.73 104.43 2.53 BP _MWD+IFR+MS 204 10864.85 89.40 118.33 32.01 4687.24 8354.59 -2089.37 8089.35 8354.83 104.48 1.26 BP _MWD+IFR+MS 205 10896.88 89.00 121.03 32.03 4687.69 8385.56 -2105.22 8117.18 8385.73 104.54 8.52 BP MWD+IFR+MS 206 10929.33 89.12 120.56 32.45 4688.22 8416.77 -2121.83 8145.05 8416.89 104.60 1.49 BP _MWD+IFR+MS 207 10961.16 89.05 121.38 31.83 4688.73 8447.35 -2138.21 8172.34 8447.43 104.66 2.59 BP _MWD+IFR+MS 208 10992.76 89.24 122.98 31.60 4689.20 8477.52 -2155.04 8199.08 8477.56 104.73 5.10 BP _MWD+IFR+MS 209 11024.67 89.98 120.92 31.91 4689.42 8508.03 -2171.92 8226.15 8508.05 104.79 6.86 BP _MWD+IFR+MS 210 11057.31 90.25 117.01 32.64 4689.35 8539.68 -2187.73 8254.71 8539.69 104.84 12.01 BP MWD+IFR+MS SCHLUMBERGER Survey Report 1-Aug-2006 11:27:41 Page 9 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 211 11088.09 90.40 115.72 30.78 4689.17 8569.85 -2201.40 8282.28 8569.85 104.88 4.22 BP _MWD+IFR+MS 212 11120.84 90.81 114.47 32.75 4688.83 8602.08 -2215.28 8311.94 8602.08 104.92 4.02 BP _MWD+IFR+MS 213 11152.85 89.72 112.37 32.01 4688.68 8633.74 -2228.01 8341.31 8633.74 104.95 7.39 BP _MWD+IFR+MS 214 11184.36 88.48 109.02 31.51 4689.18 8665.08 -2239.14 8370.78 8665.08 104.98 11.33 BP _MWD+IFR+MS 215 11248.72 87.40 103.09 64.36 4691.49 8729.35 -2256.92 8432.56 8729.36 104.98 9.36 BP MWD+IFR+MS 216 11280.37 86.39 99.88 31.65 4693.21 8760.90 -2263.21 8463.52 8760.90 104.97 10.62 BP MWD+IFR+MS 217 11312.25 89.16 99.65 31.88 4694.44 8792.62 -2268.61 8494.92 8792.62 104.95 8.72 BP - MWD+IFR+MS 218 11344.47 88.16 100.16 32.22 4695.20 8824.71 -2274.15 8526.65 8824.71 104.93 3.48 BP _MWD+IFR+MS 219 11375.65 85.75 100.31 31.18 4696.85 8855.74 -2279.69 8557.29 8855.74 104.92 7.74 BP _MWD+IFR+MS 220 11407.65 88.00 100.85 32.00 4698.60 8887.60 -2285.55 8588.69 8887.60 104.90 7.23 BP MWD+IFR+MS 221 11440.04 88.15 99.41 32.39 4699.69 8919.86 -2291.25 8620.56 8919.86 104.88 4.47 BP _MWD+IFR+MS 222 11471.41 89.85 101.85 31.37 4700.23 8951.13 -2297.03 8651.38 8951.13 104.87 9.48 BP _MWD+IFR+MS 223 11503.47 87.95 101.96 32.06 4700.85 8983.14 -2303.64 8682.74 8983.14 104.86 5.94 BP _MWD+IFR+MS 224 11534.69 87.22 103.04 31.22 4702.16 9014.30 -2310.39 8713.20 9014.31 104.85 4.17 BP _MWD+IFR+MS 225 11566.68 87.85 103.88 31.99 4703.54 9046.25 -2317.83 8744.28 9046.26 104.85 3.28 BP MWD+IFR+MS 226 11598.62 88.06 104.88 31.94 4704.68 9078.17 -2325.76 8775.20 9078.18 104.84 3.20 BP _MWD+IFR+MS 227 11630.17 88.85 104.93 31.55 4705.53 9109.71 -2333.87 8805.67 9109.71 104.84 2.51 BP _MWD+IFR+MS 228 11662.47 87.53 103.62 32.30 4706.55 9141.99 -2341.83 8836.96 9141.99 104.84 5.76 BP _MWD+IFR+MS 229 11693.90 87.87 105.28 31.43 4707.81 9173.39 -2349.67 8867.37 9173.40 104.84 5.39 BP _MWD+IFR+MS 230 11725.75 87.08 105.39 31.85 4709.21 9205.21 -2358.08 8898.06 9205.21 104.84 2.50 BP MWD+IFR+MS 231 11757.75 87.08 105.27 32.00 4710.85 9237.17 -2366.53 8928.88 9237.17 104.84 0.37 BP _MWD+IFR+MS 232 11789.82 86.89 104.93 32.07 4712.53 9269.19 -2374.88 8959.80 9269.20 104.85 1.21 BP _MWD+IFR+MS 233 11821.49 87.04 106.05 31.67 4714.21 9300.81 -2383.32 8990.27 9300.82 104.85 3.56 BP _MWD+IFR+MS 234 11852.84 87.38 105.64 31.35 4715.73 9332.12 -2391.87 9020.40 9332.13 104.85 1.70 BP _MWD+IFR+MS 235 11885.20 87.32 105.98 32.36 4717.23 9364.45 -2400.68 9051.50 9364.45 104.85 1.07 BP MWD+IFR+MS 236 11916.80 86.53 104.60 31.60 4718.93 9396.00 -2409.00 9081.94 9396.00 104.86 5.03 BP _MWD+IFR+MS 237 11965.00 86.53 104.60 48.20 4721.84 9444.11 -2421.13 9128.50 9444.11 104.85 0.00 Pr ojected to TD ((c)2006 IDEAL ID10 2C O1] • • Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Well No L-204 Dispatched To: AOGCC Library Date Dispatched: 18-Aug-O6 Installation/Rig Nabors 9ES Dispatched By: Melyssa Schaaf Data No Of Prints No of Floppies Surveys 2 1 Received By: Please sign and return to: Drilling & Measurements LWD Division / ~ l ~ b /_ 2525 Gambell Street, Suite 400 ' ~-f (f/J Anchorage, Alaska 99501 p~ nroselC~slb.com Fax:907-561-8317 LWD Log Delivery V1.1,10-02-03 ~.v ~ - Q °1 ~.. AI.ASS-A OII, AI1TD GA$ CO1~tSERQATI011T CO1~II~II5SIOI~T Robert Tirpack Senior Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 r FRANK H. MURKOWSKI, GOVERNOR 333 W. T" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Orion Schrader Bluff Oil Pool, PBU L-204 BP Exploration (Alaska) Inc. Permit No: 206-092 Surface Location: 2423' FSL, 3544' FEL, SEC. 34, T12N, Rl lE, UM Bottomhole Location: 11' FNL, 294' FWL, SEC. O 1, T 11 N, R 11 E, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). DATED this day of July, 2006 cc: Department of Fish 8v Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~I~Y L STATE OF ALASKA ALAS IL AND GAS CONSERVATION COMMI~N PERMIT TO DRILL 20 AAC 25.005 ~`~i~~~fvED JUN ~ 9 2006 A~BSke ~1! ~ r7e f n... n_-_- 1 a. Type of work ® Drill ^Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is p ~~,,,,fnnor: ~ ^Coalbed Methane~~i~l9ydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU L-204 ~ 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 11981 TVD 4694 12. Field /Pool(s): Prudhoe Bay Field / Orion 4a. Location of Well (Governmental Section): Surface: 3544' FEL 2423' FSL 34 T12N R11 E UM SEC 7. Property Designation: ADL 028240 Schrader Bluff , , , , , . Top of Productive Horizon: 1538' FSL, 1533' FWL, SEC. 35, T12N, R11 E, UM (OBc) 8. Land Use Permit: 13. Approximate Spud Date: July 17, 2006 Total Depth: 11' FNL, 294' FWL, SEC. 01, T11 N, R11 E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 8550' 4b. Location of Well (State Base Plane Coordinates): Surface: x-583372 y-5978147 Zone-ASP4 10. KB Elevation Plan (Height above GL): 78.6 feet 15. Distance to Nearest well Within Pool: 190' 16. Deviated Wells: Kickoff Depth: 300 feet Maximum Hole Angle: 98 de reel 17. Maximum Anticipated Pressures in psig (see 20 .035) Downhole: 2010 Surface: 155 18. Casin Pro 'ram: S ecifications To - Setti De th -Bottom Ouanti o C ent, c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 48" 20" x 34" 215.5# A53 Weld 110' Surface Surface 110' 110' 260 sx Arctic Set A rox. 13-1/2" 10-3/4" 45.5# K-55 BTC 3449' Surface Surface 3449' 2794' 602 sx AS Lite, 403 sx Class 'G' 9-7/8" 7-5/8" 29.7# L-80 BTC-M/TCII 6706' Surface Surface 6706' 4629' 561 sx Class 'G' 6-3/4" 4-1 /2" 12.6# L-80 IBT 4850' 7131' 4639' 11981' 4694' Uncemented Slotted Liner i 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft)' Junk (measured): Casing Length Size Cement Volume MD TVD Conductor /Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ®Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ® Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Scott Kolstad, 564-5347 Printed Name Robert Tirpack Title Senior Drilling Engineer Prepared By Name/Number: Si nature ~~~~ ~ Phone 564-4166 Date ~ Terrie Hubble, 564-4628 Commission Use OMy Permit To Drill Number: ~ ... API Number: .,, 50- Q2 ^ .~. tS •3 ~ Permit A proval /w Date: +~.v See cover letter for other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce Coalbed methane, gas hydrates, or gas contained shales" Samples Req'd: ^ Yes~No Mud Log Req'd: ^ Yes ~No ,e~ ~- [~ p ~ C ~-p 3 Sp p ,/~ ~ HZS Measures: Yes ^ No ' e tional Survey Req'd: Yes ^ No ~-,{,~'.skcw~{ ~ 7,p ~4-i4-C 25.D~S ~~.~~~~, a(,{"P.rt~~e Kc~t~ ~' t Ce~.~ch-2 is ~~j~t~J~c~. PPROVED BY THE COMMISSIO Date ~~~•+ ~ ~ ,COMMISSIONER Form 10-401 Revised 12/2005.,. , ,~ ~./ `~ \ Submit In Duplicate i ~ ' ~.,k • Well Name: L-204, L-204L1, L-204L2, L-204L3, & L-204L4 Drill and Complete Plan Summary Type of Well (producer or injector): Schrader Bluff OA, OBa, OBb, OBc, and OBd Multi-Lat producer Surface Location: X = 583,371.74 Y = 5,978,146.73 As Built Sec 34, T 12N, R 11 E, 2423' FSL & 3544' FEL L-204 OBc Target Start: X = 588,460 Y = 5,977,320 Z = -4510 TVDSS Sec 35, T 12N, R11 E, FEL: 3746.46 FSL: 1538.03 L-204 OBc Target End: X = 592,520 Y = 5,975,820 Z = -4615 TVDSS Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81 L-204L1 OBd Target Start: X = 587,630 Y = 5,977,625 Z = -4550 TVDSS Sec 35, T 12N, R11 E, FEL: 4572.43 FSL: 1852.93 L-204L1 OBd Target End: X = 592,520 Y = 5,975,820 Z = -4670 TVDSS Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81 L-204L2 OBb Target Start: X = 587,455 Y = 5,977,625 Z = -4430 TVDSS Sec 35, T 12N, R11 E, FEL: 4747.41 FSL: 1855.03 L-204L2 OBb Target End: X = 592,520 Y = 5,975,820 Z = -4565 TVDSS Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81 L-204L3 OBa Target Start: X = 587,435 Y = 5,977,625 Z = -4385 TVDSS Sec 35, T 12N, R11 E, FEL: 4767.41 FSL: 1855.26 L-204L3 OBa Target End: X = 592,520 Y = 5,975,820 Z = -4515 TVDSS Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81 L-204L4 OA Target Start: X = 587,350 Y = 5,977,625 Z = -4325 TVDSS Sec 35, T 12N, R11 E, FEL: 4852.40 FSL: 1856.26 L-204L4 OA Target End: X = 592,520 Y = 5,975,820 Z = -4455 TVDSS Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81 I AFE Number: TBD I Riq: Nabobs 9ES/l GL: 50.1 I RT: 28.5 I RTE: 78.6 I I Estimated Start Date: I July 17, 2006 I Well Information Distance to Nearest Property: Distance to Nearest Well in Pool Well Type: Current Status: Conductor: BHT: BHP: O eratin da s to com lete: 50 8550' to PBU boundary 190' from L-104 at 6,940' in L-204 Schrader O-sand Penta-lateral Producer ~ New well 20" X 34", 215.5 ppf, A53, ERW set at 110' KB 85 °F @ 4290' TVDss 90 °F C~3 4525' TVDss 8.3 - 8.6 EMW ppg in Schrader OBd sands Permit to Drill 6/21 /06 Formation Markers: 7 Formation To s TVD ss and Est. Pore Pressures Est. Formation To s Uncertain Commercial Hydrocarbon Bearin Est. Pore Press. Est. Pore Press. Formation TVDss feet Yes/No Psi G1 -255 +/-50' No 115 8.7 Fault #1 - L Pad Fault -880 +/- 100' No - - SV6 faulted to -880 +/-50' No 396 8.7 SV5 -1480 +/-50' No 666 8.7 SV4 -1610 +/-50' No 725 8.7 Base Permafrost -1685 +/-50' No 758 8.7 SV3 -1985 +/-50' Gas H drates 893 8.7 SV2 -2155 +/-50' Gas H drates 970 8.7 SV1 -2490 +/-50' Gas H drates 1121 8.7 UG4 -2795 +/-50' Thin coal 1258 8.7 UG4A -2825 +/-50' Heavy Oil between -2800 and -2860' SS 1271 8.7 UG3 -3190 +/-50' Thin coals 1436 8.7 UG1 -3695 +/-50' Heavy Oil from - 3820 to -3995' SS 1663 8.7 Fault #2 -3890 +/- 100' No - - UG_Ma faulted to -3890 +/-50' Yes 1751 8.7 UG_Mb1 -3910 +/-50' Yes - - UG_Mb2 -3970 +/-50' Yes 1787 8.7 UG_MC -4065 +/-50' No Wet 1829 8.7 SB_Na -4130 +/-25' No wet 1859 8.7 SB_Nb -4160 +/-25' No Wet 1872 8.7 SB_Nc -4190 +/-25' No Wet 1886 8.7 SB_Ne -4200 +/-25' No Wet 1890 8.7 SB_OA -4290 +/-25' Yes 1840- 1900 8.3 - 8.6 SB_OBa -4360 +/-25' Yes 1870- 1940 8.3 - 8.6 SB_OBb -4405 +/-25' Yes 1890- 1960 8.3 - 8.6 SB_OBc -4465 +/-25' Yes 1985 8.6 SB_OBd -4525 +/-25' Yes 1940- 2010 8.3 - 8.6 SB OBe not reached +/-25' Yes Well TD Criteria TD for all laterals will be at end of polygon. No extensions beyond the end of the polygons are planned. Comments G1 through Nf formation pressures were estimated based on hydrostatic gradients extrapolated at .45 psi/ft gradient down from surface. O sand pressures were extrapolated from L-120 and V-102 MDT pressures, but are assumed to be slightly to moderately depleted (except OBc) in the L-204 area due to L-201 production. 2 Permit to Drill 6-21-06 • Mud Pro ram: 13-1/2" Surface Hole Mud Pro erties: Spud -Freshwater Mud Interval Densi Funnel vis YP PH FL Initial 8.5 - 9.1 250-300 50-70 8.5-9.0 NC-8.0 Base Perm 9 = 9.5 200-250 30-45 8.5-9.0 8.0 Interval TD .6 max 200-250 30-40 8.5-9.0 5.0-7.0 ~/ 9-7/8" Intermediate Hole Mud Pro erties: Freshwater Mud (LSND) Interval Densi YP PV API Filtrate MBT H Chlorides Surface shoe to interval TD 8.8 - 9.3 22-30 12-18 4-6 < 20 9.0-9.5 <600 6-3/4" Production Hole Mud Pro erties: LVT-200 MOBM (Versa-Pro) Interval Densit Stabili Oil: Water Ratio YP PV API Filtrate MBT All five Laterals 9.2 650-900 80:20, initial 15-19 <20 4-5.5 < 6 Survey and Logging Program: 13-1/2" Hole Section: Surface Gyro may be needed O en Hole: MWD / GR Cased hole: None 9-7/8" Intermediate Hole: Surveys will be IIFR corrected real time and multi-station O en hole: MWD / GR / Res / Azimuthal Den / Neu / PWD Cased Hole: None 6-3/4" Produciton Holes: Surveys will be IIFR corrected real time and multi-station O en hole: MWD / GR / Res / Azimuthal Den / Neu /AIM / PW D Cased Hole: N/A Casing/Tubing Program Hole Size Csg / Tb O.D. Wt/Ft Grade Conn ! Burst si Collapse si Length Top MD /TVD Bottom MD /TVD 48" 20" X 34" 215.5# A53 Weld GL 110'/110' 13-'/z" 10-3/a" 45.5# K-55 BTC 3,580 2,090 3449' GL 3449' / 2794' 9-%8" 7-5/8" 29.7# L-80 BTC-M / TC-I I 6,890 4,790 6706' GL 6706' / 4629' 6-3/a" OBd 4-%2" slotted 12.6# L-80 IBT N/A N/A 5776' 6200' / 4511' 11976' / 4749' 6-3/4" OBc 4-~/2" slotted 12.6# L-80 IBT N/A N/A 4850' 7131' / 4639' 11981' / 4694 6-3/a" OBb 4-'/z"slotted 12.6# L-80 IBT N/A N/A 5839' 6122' / 4479' 11961' / 4644' 6-3/a" OBa 4-'/z" slotted 12.6# L-80 IBT N/A N/A 5930' 6017' / 4429' 11947' / 4594' 6-3/a" OA 4-'/2" slotted 12.6# L-80 IBT N/A N/A 6045' 5876' / 4352' 11921' / 4534' Tubin 4-%2" 12.6# L-80 IBT-M 8,430 7,500 5800' GL 5800' / 4305' Surface and Anti-Collision Issues Surface Shut-in Wells: L-104 and L-106 will require surface shut-in and well house removal in order to move over well L-204. No other wells should require well house removal and surface shut-in. Close Approach Shut-in Wells: One well will require subsurface isolation for this profile. L-104 will remain shut in until all 5 laterals pass the close approach depth. 3 Permit to Dril16-21-06 • Close Approach Well List: • Lateral Well Ctr-Ctr Reference Allowable Precautionary Name Distance MD Deviation Comment OBc L-104 190' 6940 -27.71 Use Traveling C tinder OBb L-104 197.26 6836.1 180.18 Use Traveling C tinder OBa L-104 221.31 6772 203.39 Use Traveling C tinder OA L-104 211.84 6516 198.88 Use Traveling C tinder Cement Calculations Casing Size: 10-3/a -in 45.5-Ib/ft K-55 BTC surface casing Basis: Lead: 250% exc ver gauge hole in permafrost, 30% excess over gauge hole below permafrost Lead TOC: S ac Tail: 1,000' -open hole with 30% excess, plus 80' shoe track Tail TOC: 2,449' MD 1,000' MD above shoe Total Cement Volume: Spacer 75 bbls of Viscosified cer weighted to 10.10 ppg (Mud P Lead 476 bbls, 2673 cuf sks 10.7 Ib/ al ASL G + adds - uft/sk Tail 84 bbls, 472 cuft, 4 sks 15.8 Ib/ al Class G + adds - .1 uft/sk Temp BHST ~55° F, BHC ~60° F estimated by Schlumberge In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Casing Size: 7-5/8", 29.7-Ib/ft L-80 BTC-M / TC-II intermediate casin Basis: Lead: None Lead TOC: N/A Tail: 2257' op hole with 30% excess, plus 80' shoe track Tail TOC: 444 ' D 827' MD above the Ma, 1000' MD below Surface Shoe ~ Total Cement Vol e: Wash 20 bbls CW100 S acer 50 bbls of Viscosif' acer Mud ush Wei hted to Tail 116 bbls, 651 cuf 5 sks 15.8 Ib/ al G + Gasblok - 1.16 uft/sk Temp BHST ~ 90° F at 4 5 TVDss. from SOR Centralizer Recommendations 10-3/a" Casing Centralizer Placement a) Run (25) 10-3/4" Bow-spring centralizers attached over the collar of each joint of casing from the casing shoe up to 1,000' MD above the shoe. 7 5/a" Casing Space Out a) Spaceout the 7 5/8" casing to place a full joint in the window area of the OBb, OBa and OA sands. b) Place 1 RA tag above each window exit. RA tags to be spaced out ~40 - 80' above window depth except on the OBd lateral. The RA tag for the OBd lateral will need to be placed f125' above the casing shoe. 4 Permit to Drill 6-21-06 Well Control 35no ~G -~' Well control equipment consisting of 5,000 psi working pressure pip rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximu poten~l surface pressures. Based upon calculations below, BOP equipment will be tested to si. •, BOP regular test frequency will be 14 days, with a function test every 7 days. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Surface Hole A diverter will be nippled up and function tested prior to drilling surface hole Intermediate Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 10-3/4" Casing Test: • Integrity Test - 9-7/8" hole: • Kick Tolerance: Production Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 7-5/8" Casing Test: • Integrity Test - 6-3/4" hole: • Kick Tolerance: • Planned completion fluid: W,G~,010 psi -Schrader OBd (8.6 ppg ~ 4,525' TVDss) 1,558 psi -Based on a full column of gas C«3 0.10 psi/ft 3S~°-3;68t°i psi/250 psi Rams ~ 2,500 psi/250 psi Annular 2,500 psi (K-55 casing burst is 3,580 psi) 451bb1s with a 12.5 ppg EMW LOT , 8.6 ppg OBd W,(.~Z,010 psi - Schrader OBd (8.6 ppg C~ 4,525' TVDss) 1,558 psi -Based on a full column of gad C~3 0.10 psi/ft 3Soo~89er psi/250 psi Rams 2,500 psi/250 psi Annular 3,500 psi FI o 11.5ppg EMW for OBc lateral only fini~ at OBc, OBd, OBb, OBa, and OA with an 11.5 ppg EMW FIT 3~ppg SF OBM in Laterals, 9.2 ppg Brine, 6.8 ppg diesel in mother bore Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. 5 Permit to Drill 6-21-06 Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE Well Control A. The Schrader in the target fault block is expected to be normal pressured at 8.3-8.6 ppg EMW. This pressure is estimated based on offset well pressures and material balance. Hydrates and Shallow gas A. Gas Hydrates are expected at L-pad from the SV5 thru the SV1 sands below the base of the permafrost. Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole. Recommended practices and precautions for drilling hydrates should be followed in the surface hole. Occasionally hydrates are encountered below the SV1. III. Lost Circulation/Breathing A. Lost circulation is not expected at fault #1. This fault has been penetrated by most wells drilled from L Pad. B. Breathing is not expected on this well. IV. Kick Tolerance/Integrity Testing Kick Tolerance / Int ri Testin Summa Table Casing set / Maximum Influx Volume Mud Weight Exp Pore Press Min LOT /FIT Interval Surface / 9 7/8" 145 9.3 8.6 OBd 12.5 LOT Intermediate / 6-3/4" Infinite 9.3 8.6 (OBc) 11.5 (FIT for OBc lateral onl NOTE: All LOT /FIT will be taken with a minimum of 20-ft and a maximum of 50-ft of new hole drilled outside of the previous casing string An FIT will only be performed for the OBc lateral, not the OBd, OBb, OBa, or OA. L-Pad development wells may have "kick tolerances" in the 25 bbl range. A heightened awareness of kick detection, pre-job planning and trip tank calibration will be essential while drilling/tripping the intermediate/ roduction intervals. V. Hydrogen Sulfide L Pad is no _designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. No measurable H2S is being produced from the formation at this time. However 5 - 50 ppm is expected as a result of the use of Ivishak gas lift gas. All LV Pad gas lift wells will likely have H2S in this concentration. Note that all injection has been with produced water not seawater. H2S levels are expected to remain low until the waterflood matures. Recent H2S data from the pad is as follows: Adjacent producers at Surface: Adjacent producers at TD: L-106 50 ppm L-201 10 ppm L-102 20 ppm VI. Faults A. Two faults are expected to be crossed in L-204. No losses are expected to be associated with these faults. No faults are expected in the reservoir section, although sub seismic faults with throws <25' may be encountered. Fault Location MD TVDss Throw Direction Uncertainty Fault #1 - L Pad 965' -880 -30' West +/- 100' MD Fault Fault #2 - Ugnu M 5,276' -3890' -145' West +/- 100' MD Sand Interval 6 Permit to Drill 6-21-06 • CONSULT THE PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION L-204, L-204 L1, L-204 L2, L-204 L3 & L-204 L4 DRILL AND COMPLETE PROCEDURE SUMMARY Pre-Riq Work: 1. A 34" x 20" insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and production simops. Drilling Riq Operations: 1. MIRU Nabors 9ES. Nipple up diverter spool and riser. Function test diverter. PU 4" DP and stand back in derrick. 2. MU 13-'/z" drilling assembly with MWD/GR and directionally drill surface hole to approximately 3449' MD. The actual surface hole TD will be +/-100' TVD below the top of the SV1 sand. 3. Run and cement the 10-3/a", 45.5#, K-55 BTC surface casing back to surface. ND drilling spool and riser and NU casing /tubing head. NU BOPE and test to~,AA6~psi. SOD bJCsk- 4. MU 9'/8" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Ghost reamer ±1,000'and ±2,000' from the bit. RIH to float collar. Test the 10-3/a" casing to 2,500 psi for 30 minutes. 5. Drill out shoe track and displace the well to new 8.8 LSND drilling fluid. Drill 20' of new formation and perform a LOT. Directionally drill ahead to TD at ± 6706'. (185' MD below Top OBd). 6. MU and run 7-g/8", 29.7#, L-80, BTC-M, TC-II casing to TD. Cement in one stage to 4,450' MD (1000' MD j from the surface casing shoe). Bump plug with seawater. 7. Clean pits for displacement. Freeze protect 7 5/8" x 10-3/a" annulus to 2,200' TVD. • L-204 OBc Lateral 8. PU 6-3/a" convent' al assembly with MWD/GR/Res/Den /Neu/AIM/PWD and RIH to the float collar. Test the 7 5/a" casing to ,500 psi for 30 minutes. 9. Displace well lrer--to 9.2 ppg Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of new formation and perform FIT to 11.5 ppg EMW. 10. Directionally drill ahead to TD geo-steering through the OBc to TD at 11981' MD. Back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 11. POOH to near OBb window depth, log the top OBb (RA marker) with GR, log across the OBa and OA windows as well. POOH. 12. MU and run 4-Yz" 12.6# L-80 BTC-M slotted liner with swell packer and Aluminum billet liner top. Position billet at 7,131'. POOH. • L-204L7, OBd Lateral 13. RIH with 6-3/a" sidetracking /drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to AI billet. Displace well/ over to 9.2 ppg Versapro MOBM. Time mill off billet to sidetrack. Directionally drill to the planned TD in the OBd. Back ream out of hole to shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 14. MU and run 4-~/s" 12.6# L-80 BTC-M slotted liner with liner hanger and liner top packer. Position TOL for OBb whipstock. POOH. • L-204L2, OBb Lateral / 15. PU the 7 5/8" whipstock assembly. Set the whipstock on the OBd liner top packer such that the top of the window is near the top of the OBb sand. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.2 ppg Versapro MOBM. Mill window. POOH. 16. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TD of OBb lateral. Back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 17. Pull whipstock #1. Run and set 4-~/z" slotted liner and hook hanger. POOH and LD liner running string. Run / Baker Hook Hanger Lateral Entry Module #1 with ZXP liner top packer, POOH. 7 Permit to Drill 6-21-06 • L-204L3, OBa Lateral 18. PU the 7 5/8" whipstock assembly. Set the whipstock on the OBb liner top packer such that the top of the window is near the top of the OBa sand. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.2 ppg Versapro MOBM. Mill window. POOH. 19. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TD of the OBa lateral. Back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 20. Pull whipstock #2. Run and set 4-~/z" slotted liner and hook hanger, POOH and LD liner running string. Run / Baker Hook Hanger Lateral Entry Module #2 with ZXP liner top packer, POOH. • L-204L4, OA Lateral 21. PU the 7 5/s" whipstock assembly. Set the whipstock on the OBa liner top packer such that the top of the window is near the top of the OA sand. Orient and set whipstock. Shear off of Whipstock. Displace well over to 9.2 ppg Versapro MOBM. Mill window. POOH. 22. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TD of the OA lateral. Back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 23. Pull whipstock #3. Run 4-~/z" slotted liner and hook hanger, POOH and LD liner running string. Run Baker j Hook Hanger Lateral Entry Module #3 with ZXP liner top packer. Clean pits for displacement. Displace mother bore over to 9.2 ppg KCL brine. POOH. 24. MU 4-'h" 12.6# IBT-M, L-80 completion assembly and RIH. See completion schematic for details. Land tubing hanger and run in lockdown screws. 25. Dro C ball and rod and set packer as per Baker recommendation and test tubing to 50 psi and annulus to ,50 psi. Shear DCK valve. 26. Ins - two-way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 27. Pull two-way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze protect the well to 2,200' TVD. Install VR plug in 7-5/B" casing annulus valves. 28. Install BPV. Secure the well and rig down /move off Nabors 9ES. Post-Rig Work: 1. MIRU slickline. Pull the ball and rod / RHC plug. 2. Pull out DCK shear valve, install GLV in all of the other mandrels as per the PE. 8 Permit to Drill 6-21-06 • Variance Request Issue Compliance with AOGCC testing requirements for BOP rams after they have been used in the normal coarse of operations. Re uest The AOGCC is in the process of developing a guideline document clarifing the intent of the regulations pertaining to function pressure testing ram type BOP's. BPXA requests a variance to the provisions of 20 AAC 25A35 (e)(10)C regarding the function pressure test requirement after tike use of BOP ram type equipment far other than well control or equivalent purposes, except when the routine use of BOP ram type equipment may have compromised their effectiveness. (Example would be when pipe rams are inadvertently closed on a tool joint during routine operations.} The activities associated with this request will not compromise the integrity of the BOP equipment. Background AOGCC regulations require rams that have been used in the course of primary drilling & completion, workover and through tubing drilling operations be function pressure tested before the next wellbore entry. This is not a new regulation. The intent of this regulation is to ensure that ram type equipment has integrity after it has been utilized in a wellbore...for example; to ensure integrity if a ram was closed on a tool joint. The exact regulation language is: "if BOP sealing ram type equipment has been used, it must be function pressure-tested, before the next wellbore entry, to the required working pressure specified in the approved Permit to Drill, using anon-compressible fluid, except that an annular type preventer need not be tested to more than 50 percent of its rated working pressure;" The pertinent sections are: 20 AAC 25.035 (e)(10)C PRIMARY DRILLING AND COMPLETION; 20 AAC 25.036 (d}(4) THROUGH TUBING DRILLING AND COMPLETION; 20 AAC 25.285 {f}(2) TUBING WORKOVERS: 20 AAC 25.286(e)(1) WORKSTRING SERVICE OPERATIONS This issue has been discussed with Winton Aubert at the AOGCC. The test requirement in the regulation is intended to apply to ram type eauipment only. The AOGCC understands that ram type BOP's are utilized for purposes other than well control in the normal coarse of operations. The regulations allowing a variance are at 20 AAC 25.035(h} PRIMARY DRILLING AND COMPLETIONV; 20 AAC 25.036(f} THROUGH TUBING DRILLING AND COMPLETION; 20 AAC 25.285(h} TUBING WORKOVERS; 20 AAC 25.286(g} WORKSTRING SERVICE OPERATIONS...which says generally: 20 AAC 25.035(h)... Upon request of the operator, the commission will, in its discretion, approve a variance (1) from the BOPE requirements in (e} of this section if the variance provides at least an equally effective means of well control; L-204, L1, L2, L3, & L4 PROPOSED COMPLETION TREE: FMC 4-1/16" 5M WELLHEAD: FMC Gen 5 System 20" X 34" 215.5 Ib/ft, A53 ERW Insulated @ 109' 11". 5M csg.head w/ 7" mandrel hanger 8 packoff 11" x 11", 5M, tbg spool w/ Halliburton X-Nipple (3.813" ID) @ 2200' TVD 11" x 4-1/2" tubing hanger with control line ports 11" X 4-1/16" Adaptor Flange 4-1/2", 12.6 Ib/ft, L-80, BTC-M Orig KB elev (N-9ES) _' Coupling OD: 5.2" DrifUID : 3.833"/3.958" 10-3/4", 45.5# K-55 BTC Csg @ 3,449' MD 4.5" Baker sliding sleeve with 3.813" ID @ GLM Design: - 7-5/8" X 5-112" Baker PRM Packer @ #4 -TBD' TVD - 4-1/2" X 1" KBG-2 - SV #3 -TBD' TVD - 4-1/2" X 1" KBG-2 - DV ,Halliburton X-Nipples (3.813" ID) #2 - 4 jts above sliding sleeve - 4-1/2" X 1"KBG-2 - DV 4.5° WLEG @ 5,800` MD #1 - 2 jts above sliding sleeve - 4-1/2" X 1"KBG-2 - DV Phoenix Pressure Gauge with control Versapro SFMOBM in each Lateral and rn mother bore from tbg tail down lines to surface 6-314" OA Lateral 5,876'-11,921 ` RA Tag TBD _. _ _ _ _ _ _ . Swell packer placement TBD Junction Specifications: / Junction ID through LEM Module without diverter: 3.68" RA Tag TBD LEM run with internal sealbores to allow the use of isolation sleeve across window. Baker Hughes Hookwall Hanger Window in 7-5/8" casing Well Inclination @ Window = ° Baker Hughes Hookwall Hanger Wndow in 7-5/8" casing Welt Inclination @ Window = Baker Hughes Hookwall Hanger Window in 7-5/8" casing Well Inclination @ Window 6-314" OBa Lateral 6,017'-11,947` Swell packer placement TBD RA Tag TBD s-314" OBb Lateral 6,122'-11,961' Solid Liner \ 7,131'- 11,981' 'fW~ Swell packer placement TBD Aluminum ~~ OBc Lateral RA Tag TBD ~~ ~ Billet ~ .o, If~ -5/ti", 2y. /iF, L-ttU, ti 1 (;-M Ca? li/UEi Casing Drift: 6.75" Casing ID: 6.875" DATE REV. BY COMMENTS ~ / ~j R] O ] r ~ ~ 5/31/2006 SRK Level 3Multi-Lateral, 4-t12° GL Completion ~J J `a~~/ ~~1041 ~f "u API NO: 50-029- so-o2s- ORION 50-029- WELL: L-204 ML 50-029- 6-3/4" OBd Lateral 6706'- 11,976' ~ PLANT _ N i~1s•Oe•~0" GRID - ------ ----------- ------------- I I L-PAD I I I I I ~ N-L NWE-1) I ' I ma ®a L-111( (i ' ' ~ N-A (NWE-2) I L-2181 I L-114 ~ L-124 I L-50 ~ L-1121 I L-02 I I L-121 ~ ~ L-1231 I ~ L-122 I L-110 ~ ~ L-2111 I L-SI ~ ~ L-1151 I L-116 (i ~ L-117 I L-109 ~ ~ L-118 L-SL ~ ~ L-250 L-01 ~ (i L-200 L-107 ~ L-03 ~ ~~0 sez ~ L-202 ~ L-2121 I I I I I I I I I I I I I 1 i i i I I I r ~~ I I I I I I I I I I I I I I I I I I I I I I I I I I ~ ~ L-SPARE L-2131 ~ ~ L-203 L-1081 ~ ~ ~ (i L-2161 I L-1051 ~ ~ ~ L-1031 I L-106 ~ (i L-2151 I L-204 ~ ~ L-201 I L-104 ^ ~ L-1191 L-2141 ~ L-2101 j L-102 ~ ^~ ~ L-120 I I I I I I I sao scs ~o si3 I 1 /~// _, -, 34 ~~`• 35 ~~ ~ =N L-PAD - - '~ PROJECT ~ ~.~, T12N AREA T11N w ,~ ,. ~: r _ ~ 3 ~ 2~ .,-. VICINITY MAP N.T.S. WELL N0. L-204 REVISION NOTE THIS AS-BUILT DRAWING IS A RE-ISSUE OF A PREVIOUS CONDUCTOR AS-BUILT FOR WELL L-1231 DATED 8/29/2004. WELL L-1231 WAS RENAMED AS SLOT L-SU ON 12/11/2005 AND IS NOW BEING RENAMED TO WELL 1-204. OF ~E q~q b ~Po°°~~~ ~ ~ ~ ~ =,9 >~0`49~ ~o>~ ~'~,`a~ Leonard J. o0'Hanley 11386 ,_ ~~° o 'ssla~w~- `~ SURVEYOR'S CERTIFICATE 1 HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF AUGUST 26, 2004 LEGEND NOTES RENAMED CONDUCTOR 1. DATE OF SURVEY: AUGUST 26-27, 2004. 2. REFERENCE FIELD BOOK: W004-11 PAGES 54-59. ~ EXISTING CONDUCTOR 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD 27. 4. BASIS OF HORIZONTAL LOCATION IS OPERATOR MONUMENTS, WOA L-PAD MONUMENTATION. 5. BASIS OF ELEVATION IS OPERATOR MONUMENTS PER F.R. BELL & ASSOCIATES. ELEVATIONS ARE BPX MEAN SEA LEVEL DATUM. 6. MEAN PAD SCALE FACTOR IS 0.999907827. LOCATED WITHIN PROTRACTED SEC. 34, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION N0. COORDINATES COORDINATE POSITION DMS POSITION D.DD BOX ELEV. OFFSETS L-204 = 5,978,146.73 N 9,819.88 70'21'00.936" ' " 70.3502600' 50 1 2,423 FSL ' X= 583,371.74 E 5,339.90 149'19 23.212 149.3231144' ' 3,544 FEL bP LJULJIJ ~ FR805 woL 11-02 WOA L-PAD ~ ~(~~O~o roe Ho: CONDUCTOR AS-BUILT l9J ~UU SCALE: .~. CEO ~ 1^= 1s0• WELL L-204 µ~" ~ =>u SHEET: 1 OF 1 ap L-204 (P3c1 Obc P Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA StruGure 1 Slot: Well: L-PAD / S-U PIanL-204(S-U) ~~I~~ Borehole: ~~ Plan L-204 OBc ~~'a UWIIAPI#: 50029 Survey Name /Date: L-204 (P3c) OBc /May 23, 2006 Tort 1 AHD 1 DDI 1 ERD ratio: 175.800° 19583.07 ft 16.634 / 2.042 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LaULong: N 70.35026009, W 149.3231143 Location Grid NIE YIX: N 5978146.730 ftUS, E 583371.740 ftUS Gdd Convergence Angle: +0.63747117° osa~ Schlumberger Vertical Section Azimuth: 104.910° Vertical Section Origin: S 0.003 ft, W 0.001 ft rvD Reference Datum: Rotary Table TVD Reference Elevation: 78.60 ft relative to MSL Sea Bed 1 Ground Level Elevation: 50.10 ft relative to MSL Magnetic Declination: 24.153° Total Field Strength: 57579.601 nT Magnetic Dip: 80.859° Declination Date: July 30, 2006 Magnetic Declination Model: BGGM 2005 North Reference: True North Total Corr Mag North -> True North: +24.153° Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical NS EW DLS Tool Face Build Rate Walk Rate Northing Easting Lathude Longitude Depth Section ft d de ft ft ft ft ft d 100 ft d de 100 ft de 100 ft ftUS ftUS Klt U.UV V.VV l/U.UU -/C.bV U.UU U.UU U.UU U.UU U.UU 1/U.UVM U.UU U.UU by/23146./3 btl:S3/1./4 N /U.39UZ6UUy W 14y.3ZJ1143b KOP Bld 1.5/100 300.00 0.00 170.00 221.40 300.00 0.00 0.00 0.00 0.00 170.OOM 0.00 0.00 5978146.73 583371.74 N 70.35026009 W 149.32311435 G1 333.60 0.50 170.00 255.00 333.60 0.06 -0.15 0.03 1.50 170.OOM 1.50 0.00 5978146.58 583371.77 N 70.35025969 W 149.32311414 Bld 3/100 400.00 1.50 170.00 321.39 399.99 0.55 -1.29 0.23 1.50 170.OOM 1.50 0.00 5978145.44 583371.98 N 70.35025657 W 149.32311250 500.00 4.50 170.00 421.24 499.84 2.76 -6.44 1.14 3.00 170.OOM 3.00 0.00 5978140.30 583372.95 N 70.35024249 W 149.32310513 Crv 3/100 550.00 6.00 170.00 471.03 549.63 4.68 -10.95 1.93 3.00 -82.OOG 3.00 0.00 5978135.81 583373.79 N 70.35023018 W 149.32309868 600.00 6.38 156.52 520.74 599.34 7.51 -16.07 3.49 3.00 -68.59G 0.77 -26.97 5978130.70 583375.41 N 70.35021619 W 149.32308600 700.00 7.98 135.97 619.97 698.57 16.91 -26.16 10.53 3.00 -48.21 G 1.60 -20.55 5978120.69 583382.56 N 70.35018862 W 149.32302884 800.00 10.23 123.28 718.71 797.31 31.29 -36.03 22.78 3.00 -35.67G 2.25 -12.70 5978110.96 583394.92 N 70.35016167 W 149.32292941 900.00 12.78 115.35 816.70 895.30 50.59 -45.64 40.20 3.00 -27.89G 2.56 -7.93 5978101.55 583412.45 N 70.35013542 W 149.32278797 SV6 965.14 14.54 111.70 880.00 958.60 65.80 -51.75 54.32 3.00 O.OOG 2.69 -5.59 5978095.60 583426.62 N70.35011873 W 149.32267343 Fault 1 965.15 14.54 111.70 880.01 958.61 65.80 -51.75 54.32 3.00 -24.35G 2.73 -4.93 5978095.60 583426.62 N 70.35011873 W 149.322 1 1000.00 15.50 110.09 913.67 992.27 74.78 -54.96 62.75 3.00 -22.79G 2.75 -4.63 5978092.47 583435.10 2 N 70.35010994 W 149.32 1100.00 18.30 106.39 1009.34 1087.94 103.79 -63.98 90.37 3.00 -19.25G 2.80 -3.70 5978083.76 583462.80 N 70.35008530 W 149.32 7 1200.00 21.15 103.65 1103.47 1182.07 137.53 -72.67 122.97 3.00 -16.67G 2.85 -2.74 5978075.44 583495.50 N 70.35006156 W 149.32211612 1300.00 24.04 101.53 1195.78 1274.38 175.91 -81.00 160.47 3.00 -14.72G 2.89 -2.11 5978067.53 583533.08 N 70.35003880 W 149.32181170 1400.00 26.95 99.85 1286.03 1364.63 218.83 -88.95 202.77 3.00 -13.20G 2.91 -1.68 5978060.05 583575.46 N 70.35001707 W 149.32146834 1500.00 29.88 98.48 1373.98 1452.58 266.17 -96.51 249.74 3.00 -11.99G 2.93 -1.37 5978053.02 583622.52 N 70.34999643 W 149.32108699 1600.00 32.82 97.33 1459.37 1537.97 317.79 -103.64 301.27 3.00 -11.01 G 2.94 -1.15 5978046.46 583674.12 N 70.34997694 W 149.32066869 SV5 1624.65 33.55 97.07 1480.00 1558.60 331.17 -105.33 314.66 3.00 -10.80G 2.95 -1.04 5978044.92 583687.52 N 70.34997232 W 149.32056001 17 00 00 .77 35 96.35 1541.97 1620.57 373.57 -1 10 33 7.21 35 3.00 -1 .2 0 OG 2. 95 -0.96 5978040.39 583730.12 N 70.34995866 W 149.32021459 SV4 1785.22 38.29 95.62 1610.00 1688.60 424.26 -115.67 408.25 3.00 -9.62G 2.96 -0.86 5978035.62 583781.21 N 70.34994406 W 149.31980028 1800.00 38.73 95.50 1621.57 1700.17 433.35 -116.56 417.41 3.00 -9.52G 2.96 -0.80 5978034.83 583790.38 N 70.34994162 W 149.31972593 WeIlDesign Ver SP 1.0 Bld( doc40x_56) S-U\Plan L-204 (S-U)\Plan L-204 OBc\L-204 (P3c) OBc Generated 5/23!2006 11:45 AM Page 1 of 3 Measured Vertical Comments Inclination Azimuth Sub•Sea ND TVD NS EW DLS Tool Face Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section ft d d ft ft ft ft ft de 100 ft de d 100 ft d 100 ft ftUS ftUS tn0 GN 12543.Zb 4U.Ul `Jb .l/ lbbb.UU l/33.bU 4bU .3`J -ll`J.ll 444./L 3.UU U.UUh L.`JO -V.// ~`J/tlU3L.U`J Otl3tll/./l IV /U .34`J`J3400 VV l4`J.3"I `JbV4L3 Base Perm 1882. 41 40.01 95. 17 1685.00 1763.60 485. 21 -121.38 469.79 0.00 O.OOG 0.00 0.00 5978030.60 583842.81 N 70. 34992846 W 149.31930068 CN 3/100 1895 .47 40.01 95. 17 1695.00 1773.60 493 .48 -122.13 478.15 0.00 4.88G 0.00 0.00 5978029.94 583851.18 N 70 .34992639 W 149.31923282 1900 .00 40.14 95. 18 1698.47 1777.07 496 .35 -122.40 481.06 3.00 4.87G 2.99 0.40 5978029.70 583854.08 N 70 .34992567 W 149.31920923 2000 .00 43.13 95. 56 1773.20 1851.80 561 .87 -128.62 547.20 3.00 4.59G 2.99 0.37 5978024.22 583920.28 N 70 .34990866 W 149.31867232 2100 .00 46.12 95. 89 1844.36 1922.96 631 .21 -135.63 617.09 3.00 4.35G 2.99 0.33 5978017.99 583990.24 N 70 .34988949 W 149.31810498 2200 .00 49.11 96. 19 1911.76 1990.36 704 .18 -143.41 690.53 3.00 4.15G 2.99 0.30 5978011.03 584063.76 N 70 .34986823 W 149.31750876 End CN 2229 .07 49.98 96. 27 1930.62 2009.22 726 .05 -145.81 712.52 3.00 O.OOG 2.99 0.28 5978008.87 584085.77 N 70 .34986167 W 149.31733026 SV3 2313. 64 49.98 96. 27 1985.00 2063.60 790. 08 -152.88 776.90 0.00 O.OOG 0.00 0.00 5978002.51 584150.22 N 70. 34984232 W 149.31680765 SV2 2578. 02 49.98 96. 27 2155.00 2233.60 990. 27 -175.01 978.17 0.00 O.OOG 0.00 0.00 5977982.63 584351.70 N 70. 34978181 W 149.31517384 SV1 3099. 01 49.98 96. 27 2490.00 2568.60 1384. 74 -218.60 1374.78 0.00 O.OOG 0.00 0.00 5977943.45 584748.74 N 70. 34966254 W 149.31195432 10-3/4" Csg Pt 3448. 92 49.98 96. 27 2715.00 2793.60 1649. 69 -247.88 1641.16 0.00 O.OOG 0.00 0.00 5977917.14 585015.41 N 70. 34958240 W 149.3097 UG4 3573. 34 49.98 96. 27 2795.00 2873.60 1743. 89 -258.30 1735.88 0.00 O.OOG 0.00 0.00 5977907.79 585110.22 N 70. 34955390 W 149.30902 4 UG4A 3619. 99 49.98 96. 27 2825.00 2903.60 1779. 22 -262.20 1771.40 0.00 O.OOG 0.00 0.00 5977904.28 585145.78 N 70. 34954321 W 149.30873483 UG3 4187. 64 49.98 96. 27 3190.00 3268.60 2209. 02 -309.70 2203.53 0.00 O.OOG 0.00 0.00 5977861.59 585578.37 N 70. 34941314 W 149.30522707 UG1 4973. 00 49.98 96. 27 3695.00 3773.60 2803. 68 -375.42 2801.40 0.00 O.OOG 0.00 0.00 5977802.53 586176.88 N 70. 34923305 W 149.30037394 Ma 5276. 26 49.98 96. 27 3890.00 3968.60 3033. 30 -400.80 3032.27 0.00 O.OOG 0.00 0.00 5977779.73 586407.99 N 70. 34916348 W 149.29849998 Fault 2 5276. 28 49.98 96. 27 3890.01 3968.61 3033. 31 -400.80 3032.28 0.00 O.OOG 0.00 0.00 5977779.73 586408.01 N 70. 34916347 W 149.29849989 Mb1 5307. 37 49.98 96. 27 3910.00 3988.60 3056. 85 -403.40 3055.95 0.00 O.OOG 0.00 0.00 5977777.39 586431.70 N 70. 34915634 W 149.29830778 Mb2 5400. 68 49.98 96. 27 3970.00 4048.60 3127. 50 -411.21 3126.98 0.00 O.OOG 0.00 0.00 5977770.37 586502.81 N 70. 34913493 W 149.29773118 Mc 5548. 42 49.98 96. 27 4065.00 4143.60 3239. 37 -423.57 3239.45 0.00 O.OOG 0.00 0.00 5977759.26 586615.40 N 70. 34910103 W 149.29681824 Na 5649. 51 49.98 96. 27 4130.00 4208.60 3315. 91 -432.03 3316.41 0.00 O.OOG 0.00 0.00 5977751.66 586692.44 N 70. 34907782 W 149.29619359 Nb 5696. 16 49.98 96. 27 4160.00 4238.60 3351. 24 -435.93 3351.93 0.00 O.OOG 0.00 0.00 5977748.15 586727.99 N 70. 34906712 W 149.29590530 Nc 5742. 82 49.98 96. 27 4190.00 4268.60 3386. 56 -439.84 3387.44 0.00 O.OOG 0.00 0.00 5977744.65 586763.55 N 70. 34905641 W 149.29561700 Ne 5758. 37 49.98 96. 27 4200.00 4278.60 3398. 34 -441.14 3399.28 0.00 O.OOG 0.00 0.00 5977743.48 586775.40 N 70. 34905284 W 149.29552090 CN 4/100 5776 .02 49.98 96. 27 4211.35 4289.95 3411 .70 -442.62 3412.72 0.00 6.77G 0.00 0.00 5977742.15 586788.85 N 70 .34904878 W 149.29541182 5800 .00 50.94 96. 42 4226.61 4305.21 3429 .99 -444.66 3431.10 4.00 6.68G 3.97 0.61 5977740.31 586807.25 N 70 .34904318 W 149.29526266 5900 .00 54.91 96. 99 4286.89 4365.49 3508 .94 -453.98 3510.32 4.00 6.33G 3.97 0.57 5977731.87 586886.56 N 70 .34901762 W 149.29461964 OA 5905. 42 55.13 97. 02 4290.00 4368.60 3513. 34 -454.52 3514.73 4.00 6.32G 3.98 0.54 5977731.38 586890.98 N 70. 34901613 W 149.29458384 6000 .00 58.89 97 .50 4341.49 4420.09 3591 .94 -464.55 3593.40 4.00 6.05G 3.98 0.51 5977722.23 586969.75 N 70 .34898864 W 149.2 6 OBa 6036. 59 60.34 97. 68 4360.00 4438.60 3623. 25 -468.72 3624.69 4.00 5.96G 3.98 0.49 5977718.41 587001.08 N 70. 9 34897720 W 149.29 6100 .00 62.87 97 .97 4390.15 4468.75 3678 .60 -476.32 3679.94 4.00 5.82G 3.98 0.47 5977711.43 587056.41 N 70 .34895637 W 149.2932 80 O86 6133. 31 64.19 98. 13 4405.00 4483.60 3708. 20 -480.49 3709.46 4.00 5.76G 3.98 0.45 5977707.58 587085.97 N 70. 34894493 W 149.29300319 6200 .00 66.85 98 .42 4432.64 4511.24 3768 .49 -489.22 3769.52 4.00 5.63G 3.98 0.44 5977699.52 587146.12 N 70 .34892099 W 149.29251570 OBc 6288. 76 70.38 98. 79 4465.00 4543.60 3850. 62 -501.58 3851.23 4.00 5.50G 3.98 0.42 5977688.07 587227.95 N 70. 34888711 W 149.29185251 6300 .00 70.83 98 .83 4468.73 4547.33 3861 .16 -503.21 3861.71 4.00 5.48G 3.98 0.41 5977686.56 587238.44 N 70 .34888266 W 149.29176749 6400 .00 74.81 99 .23 4498.27 4576.87 3956 .18 -518.20 3956.04 4.00 5.37G 3.98 0.40 5977672.62 587332.93 N 70 .34884156 W 149.29100181 6500 .00 78.79 99 .61 4521.10 4599.70 4053 .07 -534.13 4052.06 4.00 5.28G 3.98 0.38 5977657.76 587429.11 N 70 .34879790 W 149.29022241 OBd 6520. 83 79.62 99. 69 4525.00 4603.60 4073. 45 -537.56 4072.24 4.00 5.27G 3.98 0.37 5977654.55 587449.33 N 70. 34878850 W 149.29005865 6600 .00 82.77 99 .98 4537.11 4615.71 4151 .36 -550.92 4149.31 4.00 5.22G 3.98 0.37 5977642.06 587526.54 N 70 .34875189 W 149.28943307 End CN 6605 .66 83.00 100 .00 4537.81 4616.41 4156 .96 -551.89 4154.84 4.00 O.OOG 3.98 0.37 5977641.14 587532.07 N 70 .34874922 W 149.28938820 WeIlDesign Ver SP 1.0 Bld( doc40x_56) S-U\Plan L-204 (S-U)\Plan L-204 OBc\L-204 (P3c) OBc Generated 5/23/2006 11:45 AM Page 2 of 3 Measured Vertical Comments Inclination Azimuth SutrSea TVD TVD NS EW DLS Tool Face Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section ft de d ft ft ft ft ft de 1100 k de de 100 ft de 100 ft ftUS ftUS IgiZ b/V8.00 253.UU IUU.UU 4bbU.UU 46Z25.6U 4Z99.if5 -b6y.13 4ZbZ.by U.UU U.000i U.UU U.UU b`J//bZb.UU 7-5/8" Csg Pt 6705.74 83.00 100.00 4550.01 4628.61 4255.93 -569.14 4252.67 0.00 O.OOG 0.00 0.00 5977624.98 Crv 10/100 6725.66 83.00 100.00 4552.44 4631.04 4275.63 -572.58 4272.14 0.00 45.19G 0.00 0.00 5977621.77 6800.00 88.26 105.27 4558.10 4636.70 4349.64 -588.79 4344.42 10.00 44.78G 7.08 7.09 5977606.36 End Crv 6820.46 89.71 106.71 4558.46 4637.06 4370.09 -594.43 4364.08 10.00 O.OOG 7.10 7.04 5977600.95 Crv 10/100 7126.04 89.71 106.71 4559.99 4638.59 4675.52 -682.29 4656.75 0.00 53.78G 0.00 0.00 5977516.35 L-204 Tgt 3 OBd KOP 7130.88 90.00 107.10 4560.00 4638.60 4680.35 -683.69 4661.38 10.00 51.01 G 5.91 8.07 5977515.00 7200.00 94.34 112.48 4557.38 4635.98 4749.14 -707.06 4726.34 10.00 51.22G 6.28 7.79 5977492.36 End Crv 7256.86 97.89 116.95 4551.32 4629.92 4804.82 -730.69 4777.67 10.00 O.OOG 6.23 7.86 5977469.31 Crv 10/100 7518.26 97.89 116.95 4515.45 4594.05 5058.05 -848.06 5008.47 0.00 -173.79G 0.00 0.00 5977354.52 L-204 Tgt 4 OBc 7597.59 90.00 116.10 4510.00 4588.60 5135.51 -883.37 5079.23 10.00 -157.67G -9.94 -1.08 5977320.00 7600.00 89.78 116.01 4510.00 4588.60 5137.87 -884.43 5081.39 10.00 -157.67G -9.25 -3.80 5977318.96 End Crv 7608.83 88.96 115.67 4510.10 4588.70 5146.55 -888.28 5089.34 10.00 O.OOG -9.25 -3.80 5977315.20 Crv 101100 8335.54 88.96 115.67 4523.29 4601.89 5860.35 -1203.06 5744.21 0.00 -93.51 G 0.00 0.00 5977007.76 8400.00 88.57 109.24 4524.68 4603.28 5924.21 -1227.66 5803.73 10.00 -93.37G -0.60 -9.98 5976983.82 L-204 Tgt 5 OBc 8412.39 88.50 108.00 4525.00 4603.60 5936.56 -1231.62 5815.47 10.00 -93.75G -0.59 -9.99 5976980.00 End Crv 8492.07 87.99 100.04 4527.44 4606.04 6016.14 -1250.90 5892.68 10.00 O.OOG -0.63 -9.98 5976961.58 Crv 10/100 9330.26 87.99 100.04 4556.77 4635.37 6850.79 -1396.99 6717.51 0.00 88.41 G 0.00 0.00 5976824.69 9400.00 88.20 107.02 4559.09 4637.69 6920.43 -1413.29 6785.24 10.00 88.18G 0.30 10.00 5976809.14 L-204 Tgt 6 OBc 9429.82 88.30 110.00 4560.00 4638.60 6950.17 -1422.75 6813.50 10.00 88.32G 0.33 10.00 5976800.00 9500.00 88.52 117.02 4561.95 4640.55 7019.49 -1450.72 6877.79 10.00 88.13G 0.31 10.00 5976772.75 End Crv 9536.14 88.64 120.63 4562.85 4641.45 7054.55 -1468.13 6909.43 10.00 O.OOG 0.33 10.00 5976755.69 Crv 10/100 10999.78 88.64 120.63 4597.62 4676.22 8463.05 -2213.65 8168.50 0.00 -89.25G 0.00 0.00 5976024.30 11000.00 88.64 120.61 4597.62 4676.22 8463.26 -2213.76 8168.69 10.00 -89.25G 0.13 -10.00 5976024.19 11100.00 88.79 110.61 4599.87 4678.47 8561.38 -2256.92 8258.73 10.00 -89.03G 0.15 -10.00 5975982.04 L-204 Tgt 7 OBc 11106.07 88.80 110.00 4600.00 4678.60 8567.41 -2259.02 8264.42 10.00 -88.67G 0.17 -10.00 5975980.00 End Crv 11199.26 89.03 100.68 4601.77 4680.37 8660.49 -2283.65 8354.18 10.00 O.OOG 0.25 -10.00 5975956.38 TD / 4-1/2" Lnr 11981.41 89.03 100.68 4615.00 4693.60 9440.40 -2428.60 9122.67 0.00 O.OOG 0.00 0.00 5975820.00 5tf/t)SU.UU N /U.J423/U'lyy W 14y.1titSby4t34 587630.08 N 70.34870195 W 149.28859420 587649.58 N 70.34869254 W 149.28843617 587722.03 N 70.34864813 W 149.28784954 587741.75 N 70.34863271 W 149.28768997 588035.36 N 70.34839220 W 149.28531469 588040.00 N 70.34838835 W 149.28527714 588105.21 N 70.34832439 W 149.28475000 588156.80 N 70.34825976 W 149.28433343 588388.86 N 70.34793871 W 149.28246066 588460.00 N 70.34784210 W 149.28188653 588462.18 N 70.34783920 W 149.28181 588470.17 N 70.34782867 W 149.28180445 589128.43 N 70.34696743 W 149.27649092 589188.22 N 70.34690009 W 149.27600793 589200.00 N 70.34688927 W 149.27591270 589277.41 N 70.34683642 W 149.27528613 590103.75 N 70.34643542 W 149.26859239 590171.64 N 70.34639073 W 149.26804282 590200.00 N 70.34636481 W 149.26781355 590264.60 N 70.34628825 W 149.26729192 590296.43 N 70.34624059 W 149.26703521 591563.59 N 70.34420046 W 149.25682288 591563.78 N 70.34420015 W 149.25682132 591654.29 N 70.34408198 W 149.25609098 591660.00 N 70.34407622 W 149.25604483 591750.02 N 70.34400867 W 149.25531660 592520.00 N 70.34361024 W 149.24908144 1~ u WeIlDesign Ver SP 1.0 Bld( doc40x_56) S-U\Plan L-204 (S-U)\Plan L-204 OBc\L-204 (P3c) OBc Generated 5/23/2006 11:45 AM Page 3 of 3 by WELL FIELD STRUt:iUHF L-204 (P3c) OBc Prudhoe Bay Unit - WOA L-PAD MayMx; Paranlalan Sudan LI.:XI1T NAUl/ AlasMa SIa1n Plnn~. Loly 04. US Fent Miswllarnous Modal. B4(:M 2W5 Op. WB59' Dale: July 30,%006 lal. N]0210.936 NuMliny. '..J/8140./311US (.nd (;wn: .. SWI'. S-U TVD RW: Rolary Table (]fi.W M1above MSl) Mag Dec: .24.153' FS. 6n1 Lon. W1491923.212 Easl.g ule falJ.° W]B96 Plan. L-20a IF'0c1 OBC Brvy Daie May 23, 2006 0 1200 2400 3600 4800 6000 7200 8400 9600 0 1200 0 0 N E 2400 u a: U 0 H 3600 4800 ...-..-..-.o-..-..-..-..-..-..-..-..-.~- .i. -. s::s::s::z:~::z::z::z::z::z::z::z::z:jz::z::~z. ~ Schlumberger 3...-..-.._.._.._.._.._. _ _.._.._.._.._.._.._.._ _.._.._.._.._.._.._..- - -.._..-..-..-.._..-.. _ .-.._..-.._..-..-..-.. ..-..-.._..-.._.._.._.._ _.._.._.. Fault ...-..-.. i._..j.._.._.. .4Ccrv 4/14Q._.._..~..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..-.. ... ~ ...... ......... ......_ .................,. End Crv...... n 2 crv 10/100 ~.. Crv 10/100 Entl Crv L 204 Tgt 5 OBC Csg Pt Crv 10/100 L~204 Tgt 3 OBd KOP TD 14.1/2" Lnr 0 1200 2400 3600 i 4800 0 1200 2400 3600 4800 6000 7200 8400 9600 Vertical Section (ft) Azim = 104.91 °, Scale = 1(in):1200(ft) Origin = -0.00284082 N/-S, -0.000888126 E/-V by Schlumberger WELL L-204 (P3c) OBc FIF Lp Prudhoe Bay Unit - WOA STRUCTURE L-PAD Mayaal:: Pay Surlaw luu i NAU1/ Alai a Swte Vla~uv. (ui.: 04. US f au Mlscellan ~ MWW-. BG(,M 1005 [JW 90.859' Uale. lulY :f0. 2006 N/01f 0.936 NaNIinU- ~ 46./39US .063/dll l/- 5-U iVU ReI: RWary i~W11860M1aWw MSLI Slot-. Mag Oac'. +N.163' FS'. r9]9fi ni L~0 W14U 191321/ EaslnY 6933!1 /49US alu Facl OY9YL0'/tlJfi Plan: LN141P3cl Ofk SnY Ualu: MaY Y3. 1006 1200 ~ 0 /~ KOP Bld ~ ela Z Cn O O N ~- -1200 Q) IfS U Cn V V V -2400 -3600 0 1200 2400 3600 4800 6000 7200 8400 9600 -- ........... ~ .................................. i..................................i...................................~.................................. ~.................................. i...................................~..................................~.................................. i..... L-204 Flt 2 3890'ys -204 Fn 1 880ss RTE ~ fJ1(' 10-314" Cs Pt ~ ~ End Crv ........ ................................:.........................9..... ........... ............ ............ ....... .............................. ............................. .......-.....-.............. ............ ... Is o Fa~nz crvatoo crvtonoo: crvlmloo I/1 0 End CN L-204 Tgt 3 OBd KOP 3/1 ault 1 ~ End Crv End Crv ! ~ _ End Crv Crv 31100 \~ `~~_\ Crva OH 00 L-204 Tgt 5 OBC Crv 10/100 Tgl 2 i ~~ :End Crv L-204:Tgt 6 OBc ' 7.518" Csg Pt Crv 101100 \ End Crv L-20d Tgt 4 Qec - End Crv Crv 101100 4 204 Tgt 7 OBc End Crv TD / 4.1@"Lnr ...........:..................................j..................................i...................................j..................................j..................................~...................................j..................................' 2 4 P3c)?OB - 0 ( c 0 1200 2400 3600 4800 6000 7200 8400 «< W Scale = 1(in):1200(ft) E »> 1200 • 0 -1200 -2400 I -3600 9600 BP Alaska Anticollision Report Company: BP Amoco Date: 5/23/2006 'l'ime: 11:58:35 Page: 1 ~~ Field: Prudhoe Bay RefexenceSite: PBL Pad Co-ordinate(NE) Reference: Well: Plan L-204 (S-U ), True North Reference Wellr Plan L-204 (S-U) Vertical jTVD) Reference: L-204 Plan S-U 78.6 i Reference Wellpath: Plan L-204 OBc Db: Oracle 'i NO GLOBAL SCAN: Using user defined selection & scan criteria Reference: Principal Plan & PLANNED PROGRAM i Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse Depth Range: 28.50 to 11981.41 ft Scan Method: Trav Cylinder North ', Maximum Radius:10000.00 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath ', Date: 4/18/2006 Validated: No Version: 4 ', ~, Planned From To Survey Toolcode Tool Name ft ft I-_- 28.50 900.00 Planned: Plan #3 V1 GYD-GC-SS Gyrodata gyro single shots 900.00 2300.00 Planned: Plan #3 V1 MWD MWD -Standard 900.00 11981.41 Planned: Plan #3 V1 MWD+IFR+MS MWD +IFR + Multi Station Casing Points MD TVD Diameter Aole Size Name ft ft ` ` in in i 3448.92 2793.60 10.750 13.500 10 3/4" 6705.66 4628.60 7.625 9.875 7-5/8" 11981.41 4693.60 4.500 6.750 41/2" Summary <------------ -. Offset Wellpath - ---------------> Reference Offset Ctr-Ctr No-Co Allowable Site Well- W011path MD MD Distance Arca Deviation Warning / l ft ft ft- ft ft PB L Pad L-01 L-01 V14 604.25 605.00 117.51 10.34 107.16 Pass: Major Risk PB L Pad L-02 L-02 V1 517.27 535.00 331.18 8.94 322.24 Pass: Major Risk ', PB L Pad L-02 L-02A V5 518.00 530.00 331.19 9.06 322.13 Pass: Major Risk ', PB L Pad L-02 L-02APB1 V2 518.00 530.00 331.19 9.06 322.13 Pass: Major Risk PB L Pad L-02 L-02P61 V21 517.27 535.00 331.18 9.05 322.13 Pass: Major Risk PB L Pad L-03 L-03 V5 444.83 445.00 91.91 8.42 83.49 Pass: Major Risk PB L Pad L-101 L-101 V4 480.45 490.00 384.11 8.67 375.44 Pass: Major Risk PB L Pad L-102 L-102 V2 274.60 275.00 45.66 4.50 41.17 Pass: Major Risk ', PB L Pad L-102 L-102P61 V10 274.60 275.00 45.66 4.59 41.07 Pass: Major Risk PB L Pad L-102 L-102P62 V2 274.60 275.00 45.66 4.59 41.07 Pass: Major Risk ', PB L Pad L-103 L-103 V23 391.00 395.00 181.69 6.63 175.06 Pass: Major Risk ', PB L Pad L-104 L-104 V7 6939.55 7040.00 190.05 217.76 -27.71 FAIL: Major Risk PB L Pad L-105 L-105 V4 578.97 580.00 25.40 10.57 14.82 Pass: Major Risk ', PB L Pad L-106 L-106 V14 364.63 365.00 16.23 5.94 10.30 Pass: Major Risk PB L Pad L-107 L-107 V14 757.48 765.00 76.79 13.63 63.15 Pass: Major Risk ', PB L Pad L-108 L-108 V18 405.05 405.00 47.90 7.57 40.33 Pass: Major Risk ', PB L Pad L-109 L-109 V12 580.58 580.00 189.17 11.65 177.52 Pass: Major Risk PB L Pad L-110 L-110 V11 553.24 550.00 235.84 9.93 225.90 Pass: Major Risk ', PB L Pad L-111 L-111 V24 302.40 300.00 341.61 5.46 336.15 Pass: Major Risk PB L Pad L-112 L-112 V8 416.10 425.00 348.51 8.69 339.82 Pass: Major Risk ', PB L Pad L-114 L-114 V15 591.44 595.00 309.71 9.46 300.25 Pass: Major Risk PB L Pad L-114 L-114A V4 591.44 595.00 309.71 9.46 300.25 Pass: Major Risk ', PB L Pad L-115 L-115 V7 535.73 550.00 280.70 9.27 271.42 Pass: Major Risk PB L Pad L-116 L-116 V10 570.49 570.00 205.14 8.92 196.22 Pass: Major Risk PB L Pad L-117 L-117 V11 358.94 360.00 274.02 5.80 268.22 Pass: Major Risk PB L Pad L-118 L-118 V9 368.52 370.00 262.44 6.93 255.51 Pass: Major Risk PB L Pad L-119 L-119 V9 328.34 330.00 182.17 5.61 176.56 Pass: Major Risk PB L Pad L-120 L-120 V8 304.27 305.00 187.73 5.32 182.41 Pass: Major Risk PB L Pad L-121 L-121 V14 550.22 545.00 267.98 10.17 257.81 Pass: Major Risk PB L Pad L-121 L-121A V1 550.22 545.00 267.98 10.17 257.81 Pass: Major Risk PB L Pad L-122 L-122 V5 339.92 340.00 308.83 5.71 303.12 Pass: Major Risk PB L Pad L-123 L-123 V5 217.58 215.00 321.34 4.11 317.22 Pass: Major Risk PB L Pad L-123 L-123P61 V3 217.58 215.00 321.34 4.11 317.22 Pass: Major Risk PB L Pad L-124 L-124 V13 387.99 390.00 359.00 6.74 352.26 Pass: Major Risk PB L Pad L-124 L-124P61 V5 387.99 390.00 359.00 6.74 352.26 Pass: Major Risk PB L Pad L-124 L-124P62 V4 387.99 390.00 359.00 6.74 352.26 Pass: Major Risk ', PB L Pad L-200 L-200 V7 225.99 225.00 217.61 4.06 213.55 Pass: Major Risk PB L Pad L-200 L-200L1 V3 225.99 225.00 217.61 4.06 213.55 Pass: Major Risk '~ PB L Pad L-200 L-200L2 V6 225.99 225.00 217.61 4.06 213.55 Pass: Major Risk ', PB L Pad L-201 L-201 V6 254.90 255.00 180.92 4.54 176.38 Pass: Major Risk PB L Pad L-201 L-201 L1 V9 254.90 255.00 180.92 4.54 176.38 Pass: Major Risk BP Alaska Anticollision Report Company: BP Amoco - _ Date: 5!2312006 _ __ -- - Timer 11:58.35 Pager 2 ~ Fieltt: Prudhoe Bay Leference Site: PB L Pad Co-ordinate(NE) Reference: Well: Plan L-204 (S- U), True North Reference Well: Plan L-204 (S-U) Verrieal(T Vp)Reference: L-204 Plan S-U 78.6 ~ Reference Wellpath: Plan L-204 OBc ~ Db: Oracle Summary ~ <------- -Offset W"cllpath ---- --~ ~ Reference pffset ' Ctr-Ctr No-Gu Allowable .Site Well WelipatN MD MD Distance Area. Deviation Warning ft ft ft ft ft PB L Pad L-201 L-201 L1 P61 V10 254.90 255.00 180.92 4.54 176.38 Pass: Major Risk ', PB L Pad L-201 L-201 L2 V5 254.90 255.00 180.92 4.54 176.38 Pass: Major Risk ', PB L Pad L-201 L-201 L3 V2 254.90 255.00 180.92 4.54 176.38 Pass: Major Risk i PB L Pad L-201 L-201 L3P61 V6 254.90 255.00 180.92 4.54 176.38 Pass: Major Risk PB L Pad L-201 L-201 PB1 V12 254.90 255.00 180.92 4.54 176.38 Pass: Major Risk PB L Pad L-201 L-201 PB2 V3 254.90 255.00 180.92 4.54 176.38 Pass: Major Risk ~, PB L Pad L-202 L-202 V5 358.65 360.00 209.06 6.17 202.89 Pass: Major Risk ', PB L Pad L-202 L-202L1 V7 358.65 360.00 209.06 6.17 202.89 Pass: Major Risk ~I PB L Pad L-202 L-202L2 V6 358.65 360.00 209.06 6.17 202.89 Pass: Major Risk PB L Pad L-202 L-202L3 V6 358.65 360.00 209.06 6.17 202.89 Pass: Major Risk PB L Pad L-210 L-210 V6 453.97 465.00 178.63 7.88 170.75 Pass: Major Risk ~, PB L Pad L-210 L-210P61 V8 453.97 465.00 178.63 7.88 170.75 Pass: Major Risk PB L Pad L-211 L-211 V6 452.49 460.00 292.36 8.48 283.88 Pass: Major Risk ', PB L Pad L-211 L-211 P61 V6 452.49 460.00 292.36 8.48 283.88 Pass: Major Risk PB L Pad L-212 L-212 V11 324.67 325.00 201.64 5.57 196.07 Pass: Major Risk ', PB L Pad L-212 L-212P61 V9 324.67 325.00 201.64 5.57 196.07 Pass: Major Risk PB L Pad L-212 L-212PB2 V2 324.67 325.00 201.64 5.57 196.07 Pass: Major Risk PB L Pad L-213 L-213 V8 971.39 980.00 33.72 16.71 17.01 Pass: Major Risk PB L Pad L-214 L-214 V9 329.64 330.00 29.48 6.20 23.27 Pass: Major Risk PB L Pad L-214 L-214A V4 329.64 330.00 29.48 6.20 23.27 Pass: Major Risk PB L Pad L-215 L-215 V7 309.83 310.00 182.44 5.81 176.63 Pass: Major Risk PB L Pad L-215 L-215PB1 V4 309.83 310.00 182.44 5.81 176.63 Pass: Major Risk PB L Pad L-215 L-215P62 V2 309.83 310.00 182.44 5.81 176.63 Pass: Major Risk ' PB L Pad L-216 L-216 V6 255.19 255.00 185.79 4.53 181.26 Pass: Major Risk ', PB L Pad L-218 L-218 V4 550.63 565.00 370.10 9.59 360.52 Pass: Major Risk ~, PB L Pad L-250 L-250 V4 396.98 400.00 226.26 7.41 218.85 Pass: Major Risk ' ', PB L Pad L-250 L-250L1 V14 396.98 400.00 226.26 7.41 218.85 Pass: Major Risk ~~ PB L Pad L-250 L-250L2 V10 396.98 400.00 226.26 7.41 218.85 Pass: Major Risk ~~, PB L Pad L-250 L-250P61 V3 396.98 400.00 226.26 7.47 218.79 Pass: Major Risk PB L Pad L-50 L-50 V1 570.60 570.00 297.07 9.72 287.35 Pass: Major Risk ', PB L Pad L-50 L-SOP61 V4 570.60 570.00 297.07 9.72 287.35 Pass: Major Risk PB L Pad NWE1-01 L-100 V2 296.58 295.00 461.13 5.25 455.88 Pass: Major Risk PB L Pad NWE1-01 NWE1-01 V5 296.58 295.00 461.13 5.25 455.88 Pass: Major Risk PB L Pad Plan L-04 (S-L) Plan L-04 V3 Plan: Pla 579.81 580.00 174.79 10.94 163.85 Pass: Major Risk PB L Pad Plan L-204 (S-U) Plan L-204L1 OBd V1 PI 11126.41 11120.00 84.58 390.79 -306.21 FAIL: Major Risk PB L Pad Plan L-204 (S-U) Plan L-204L2 OBb V1 PI 6120.00 6120.00 0.00 139.85 -139.85 FAIL: Major Risk PB L Pad Plan L-204 (S-U) Plan L-204L3 OBa V1 PI 6015.00 6015.00 0.00 137.76 -137.76 FAIL: Major Risk PB L Pad Plan L-204 (S-U) Plan L-204L4 OA V1 Pla 5875.00 5875.00 0.00 134.77 -134.77 FAIL: Major Risk ~, PB L Pad Plan L-217 (N-P) Plan L-217 V2 Plan: PI 376.98 380.00 195.97 7.29 188.68 Pass: Major Risk ', PB L Pad Plan L-51 (S-B) Plan L-51 V3 Plan: Pla 561.90 560.00 324.66 12.03 312.63 Pass: Major Risk !, PB L Pad Plan L-52 (S-E) Plan L-52 V1 Plan: Pla 599.57 605.00 277.80 11.44 266.36 Pass: Major Risk ', PB V Pad Plan V-04 (N-O) Plan V-04 V1 Plan: Pla 8400.00 8510.00 3346.08 203.82 3142.26 Pass: Major Risk ' PB V Pad Plan V-121 (S-R) Plan V-121 V1 Plan: PI 11979.47 2640.00 5889.17 219.04 5670.13 Pass: Major Risk PB V Pad Plan V-122 (S-U) Plan V-122 V1 Plan: PI 11982.40 2360.00 6412.61 221.37 6191.24 Pass: Major Risk PB V Pad Plan V-122 (S-U) Plan V-122P61 V2 Plan: 11982.40 2360.00 6412.61 221.38 6191.22 Pass: Major Risk PB V Pad Plan V-205 (S-P) Plan V-205 V2 Plan: PI 11199.26 1110.00 7266.68 188.47 7078.21 Pass: Major Risk PB V Pad Plan V-206 (S-S) Plan V-206 V1 Plan: PI 11241.79 1140.00 7243.18 189.40 7053.77 Pass: Major Risk ', PB V Pad V-01 V-01 V15 11204.72 1390.00 7177.86 191.41 6986.45 Pass: Major Risk PB V Pad ~ V-02 V-02 V12 11199.26 4745.00 6086.45 211.08 5875.37 Pass: Major Risk , PB V Pad V-03 V-03 V7 11980.67 5685.00 5308.69 233.93 5074.77 Pass: Major Risk !, PB V Pad V-100 V-100 V7 11979.71 4345.00 5851.13 253.41 5597.72 Pass: Major Risk PB V Pad V-101 V-101 V7 8400.00 6415.00 5778.74 223.22 5555.52 Pass: Major Risk '~ PB V Pad V-102 V-102 V5 8812.05 7625.00 2726.56 194.73 2531.83 Pass: Major Risk ', PB V Pad V-103 V-103 V6 11982.22 7605.00 564.56 240.76 323.80 Pass: Major Risk !, PB V Pad V-104 V-104 V13 8412.39 7050.00 5266.71 212.40 5054.31 Pass: Major Risk PB V Pad V-105 V-105 V13 11199.26 6820.00 3153.07 215.39 2937.68 Pass: Major Risk PB V Pad V-106 V-106 V10 11725.62 7840.00 1078.85 210.58 868.27 Pass: Major Risk PB V Pad V-106 V-106A V9 11106.07 7785.00 2086.13 190.33 1895.80 Pass: Major Risk ', ', PB V Pad V-106 V-106AP61 V6 11106.07 7785.00 2086.13 190.34 1895.79 Pass: Major Risk PB V Pad V-106 V-106AP62 V2 11106.07 7785.00 2086.13 190.33 1895.80 Pass: Major Risk ' ~, PB V Pad V-106 V-106APB3 V2 11106.07 7785.00 2086.13 190.33 1895.80 Pass: Major Risk ', PB V Pad V-107 V-107 V5 11100.00 5280.00 5569.03 222.66 5346.36 Pass: Major Risk ', ii PB V Pad V-108 V-108 V7 11100.00 2550.00 6749.62 211.24 6538.38 Pass: Major Risk BP Alaska Anticollision Report Company: BP Amoco Date: 5/23/2006 Time:. 11;58;35 page: 3 Meld: Prudhoe Bay' Reference Sitc: PB L'Pad Co-ordinat~(NE) Reference: Well: Plan L-204 (S-U), True North [teference Well: Plan L-204 (S-U) Vertical (TVDIReference: L-204 Plan S-U 78.6 ReferenceN`ellpvth: Plan L-204'OBC Db: Oracle Summary <------ - Offset Wellpatb " -----= Reference pffseh Ctr-Ctr No-Go Allowable Site Well Wellpatb MD MD Distance Area Deviation Warning ft ft ft ft ft PB V Pad V-109 V-109 V2 11980.29 4240.00 5650.54 236.31 5414.22 Pass: Major Risk PB V Pad V-109 V-109PB1 V5 11980.29 4240.00 5650.54 236.31 5414.23 Pass: Major Risk PB V Pad V-109 V-109P62 V2 11980.29 4240.00 5650.54 236.31 5414.22 Pass: Major Risk PB V Pad V-111 V-111 V25 11981.89 7385.00 5088.11 224.47 4863.64 Pass: Major Risk PB V Pad V-111 V-111 P61 V8 11951.82 7635.00 5039.91 224.98 4814.93 Pass: Major Risk PB V Pad V-111 V-111 PB2 V2 11585.89 7210.00 5206.36 214.67 4991.69 Pass: Major Risk PB V Pad V-111 V-111 P63 V6 11982.02 7405.00 5094.04 224.42 4869.63 Pass: Major Risk PB V Pad V-112 V-112 V7 11050.00 5085.00 6064.16 228.34 5835.82 Pass: Major Risk PB V Pad V-113 V-113 V6 11050.00 4080.00 6418.55 231.93 6186.61 Pass: Major Risk PB V Pad V-114 V-114 V5 11171.82 1445.00 7279.68 192.45 7087.23 Pass: Major Risk PB V Pad V-114 V-114A V4 11171.82 1445.00 7279.68 192.45 7087.23 Pass: Major Risk PB V Pad V-114 V-114AP61 V4 11171.82 1445.00 7279.68 192.45 7087.23 Pass: Major Risk PB V Pad V-114 V-114AP62 V2 11171.82 1445.00 7279.68 192.45 7087.23 Pass: Major Risk PB V Pad V-115 V-115 VS 11980.82 2515.00 6547.04 222.24 6324.80 Pass: Major Risk PB V Pad V-115 V-115P61 V4 11980.82 2515.00 6547.04 222.24 6324.80 Pass: Major Risk PB V Pad V-117 V-117 V9 11982.11 2205.00 6963.58 222.65 6740.93 Pass: Major Risk PB V Pad V-117 V-117P61 V6 11982.11 2205.00 6963.58 222.65 6740.93 Pass: Major Risk PB V Pad V-117 V-117PB2 V6 11982.11 2205.00 6963.58 222.65 6740.93 Pass: Major Risk PB V Pad V-119 V-119 V13 11199.26 1760.00 7064.54 196.51 6868.03 Pass: Major Risk PB V Pad V-120 V-120 V5 11982.24 3735.00 4263.56 205.77 4057.79 Pass: Major Risk PB V Pad V-201 V-201 V8 11106.07 5271.40 4892.65 222.93 4669.73 Pass: Major Risk PB V Pad V-202 V-202 V9 10642.81 8985.00 808.88 226.33 582.55 Pass: Major Risk PB V Pad V-202 V-202L1 VS 10674.05 8985.00 813.79 218.92 594.87 Pass: Major Risk PB V Pad V-202 V-202L2 V5 10619.61 8965.00 862.28 213.43 648.86 Pass: Major Risk PB V Pad V-203 V-203 V18 7830.39 10620.00 920.69 228.34 692.34 Pass: Major Risk PB V Pad V-203 V-203L1 V6 7725.06 10621.00 922.27 No Offset Errors PB V Pad V-203 V-203L2 V4 7793.27 10605.00 931.68 No Offset Errors PB V Pad V-203 V-203L3 V3 7815.93 10595.00 935.62 No Offset Errors PB V Pad V-203 V-203L4 V3 7791.50 10593.00 952.22 245.16 707.06 Pass: Major Risk PB V Pad V-204 V-204 V2 11981.64 6410.00 4617.75 248.99 4368.76 Pass: Major Risk PB V Pad V-204 V-204L1 V2 11981.75 6245.00 4837.81 246.79 4591.03 Pass: Major Risk PB V Pad V-204 V-204L1 P61 V6 11981.75 6245.00 4837.81 246.79 4591.03 Pass: Major Risk PB V Pad V-204 V-204L2 V2 11982.02 6530.00 4431.69 248:47 4183.22 Pass: Major Risk PB V Pad V-204 V-204L2P61 V5 11958.63 6447.00 4511.11 245.78 4265.33 Pass: Major Risk PB V Pad V-204 V-204L3 V3 11981.22 6420.00 4575.93 245.03 4330.89 Pass: Major Risk PB V Pad V-204 V-204P61 V9 11981.68 6405.00 4623.31 249.22 4374.08 Pass: Major Risk PB V Pad V-204 V-204PB2 V2 11981.64 6410.00 4617.75 248.99 4368.76 Pass: Major Risk PB V Pad V-210 V-210 V9 8736.63 8280.00 754.96 198.43 556.53 Pass: Major Risk PB V Pad V-211 V-211 VS 8400.00 6440.00 4106.80 219.27 3887.52 Pass: Major Risk PB V Pad V-212 V-212 V7 11979.89 2935.00 5588.51 220.72 5367.79 Pass: Major Risk PB V Pad V-213 V-213 V5 11982.28 3280.00 5067.62 216.36 4851.26 Pass: Major Risk PB V Pad V-213 V-213PB1 V5 11982.28 3280.00 5067.62 216.35 4851.26 Pass: Major Risk PB V Pad V-214 Plan V-214 V1 Plan: PI 8492.07 7420.46 2528.53 197.49 2331.05 Pass: Major Risk PB V Pad V-214 V-214P61 V2 11150.00 1006.00 7011.51 186.37 6825.15 Pass: Major Risk PB V Pad V-214 V-214P62 V3 8470.23 7380.00 2620.96 205.15 2415.81 Pass: Major Risk PB V Pad V-214 V-214PB3 VS 8679.30 6196.00 3060.28 186.14 2874.15 Pass: Major Risk PB V Pad V-214 V-214P64 V2 10398.95 5336.00 3570.96 206.88 3364.09 Pass: Major Risk PB V Pad V-216 V-216 V8 11340.42 6801.00 1572.38 226.14 1346.24 Pass: Major Risk PB V Pad V-221 V-221 V6 11982.32 6095.00 2051.76 194.00 1857.76 Pass: Major Risk BP Alaska Anticollision Report Company: BP AmoCO Date: 5123/2006 Time:. 12:05:07 Page: 1 Meld: Prudhoe Bay Reference Site: P$ L Pad C4-ordi~nate(NE) Reference: Well: Plan L-204 (S-U), True North '!I Reference Well: Plan L-204 (S-U) Vertical'(TVD) Reference: L-204 Plan S-U 78.6 Reference Wellpath: Plan L-204 OBc Dh: Oracle '! NO GLOBAL SCAN: Using user defined selection & scan criteria Interpolation Method: MD Interval: 100.00 ft Depth Range: 28.50 to 11981.41 ft Maximum Radius:10000.00 ft Survey Program for DeTnitive Wellpath ' Date: 4/18/2006 Validated: No Planned From To Survey ft ft 28.50 900.00 Planned: Plan #3 V1 ', 900.00 2300.00 Planned: Plan #3 V1 ', 900.00 11981.41 Planned: Plan #3 V1 Reference: Principal Plan & PLANNED PROGRAM ', Error Model: ISCWSA Ellipse Scan Method: Trav Cylinder North Error Surface: Ellipse + Casing Version: 4 Toolcode Tool Name GYD-GC-SS Gyrodata gyro single shots ', MWD MWD -Standard MWD+IFR+MS MWD +IFR + Multi Station ', Casing Points ' r MD TVD Diameter Hule Size Name ~~ ft ft irr jn ' 3448.92 2793.60 10.750 13.500 10 3/4" ' 6705.66 4628.60 7.625 9.875 7-5/8" 11981.41 4693.60 4.500 6.750 4 1 /2" Summary ___ . - -- _ _ ------ --------'Offset Wellpath - _, --------> _T -- - _ Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD ' Distance Area Deviation Warning ft ft ' tt ft ft ', PB L Pad L-104 L-104 V7 399.43 400.00 13.86 2.56 11.30 Pass: Minor 11200 Site: PB L Pad Well: L-104 Rule Assigned: Minor 1/2 00 Wellpath: L-104 V7 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Alb»able MD TVD MD - TVD Ref Offset TFO-t-AZI TFO-HS' Casing/HSQistance' Area Deviation Warning ft ff ft ft ft ft deg deg in ft ft ft '~ 29.00 28.00 28.50 28.50 0.00 0.00 75.00 75.00 7.625 15.21 0.90 14.31 Pass 99.50 99.50 100.00 100.00 0.05 0.04 74.73 74.73 7.625 15.09 1.12 13.96 Pass 199.50 199.50 200.00 200.00 0.20 0.13 73.44 73.44 7.625 14.50 1.68 12.82 Pass 299.49 299.49 300.00 299.99 0.34 0.24 71.51 71.51 7.625 13.72 2.21 11.50 Pass 399.43 399.42 400.00 399.99 0.49 0.23 68.07 258.07 7.625 13.86 2.56 11.30 Pass 499.16 499.00 500.00 499.95 0.63 0.17 59.31 249.31 7.625 16.12 2.87 13.25 Pass 599.23 598.57 600.00 599.79 0.77 0.18 48.01 251.30 7.625 20.09 3.23 16.86 Pass ', 699.86 698.42 700.00 699.52 0.86 0.27 34.39 258.40 7.625 21.26 3.53 17.73 Pass 800.01 797.32 800.00 799.10 0.97 0.40 12.14 248.87 7.625 20.02 3.87 16.15 Pass 899.15 894.48 900.00 898.55 1.10 0.54 336.98 221.58 7.625 21.64 4.19 17.45 Pass '! 996.96 989.34 1000.00 997.82 1.18 0.64 306.91 196.69 7.625 31.37 4.42 26.95 Pass ', 1093.78 1082.04 1100.00 1096.79 1.33 0.68 293.01 186.43 7.625 46.11 4.51 41.60 Pass ~I 1189.65 1172.41 1200.00 1195.40 1.63 0.68 287.82 183.92 7.625 63.33 4.58 58.74 Pass !I 1284.09 1259.83 1300.00 1293.77 2.07 0.70 285.89 184.05 7.625 83.80 4.70 79.10 Pass I, 1377.34 1344.37 1400.00 1391.41 2.61 0.77 285.14 184.94 7.625 105.46 4.91 100.55 Pass i 1469.73 1426.22 1500.00 1487.78 3.25 0.92 284.63 185.76 7.625 126.62 5.19 121.44 Pass ii 1560.57 1504.62 1600.00 1583.65 3.95 0.99 283.90 186.14 7.625 150.47 5.44 145.03 Pass 1649.69 1579.37 1700.00 1678.96 4.71 1.09 282.53 185.71 7.625 176.77 5.74 171.03 Pass I 1737.48 1650.77 1800.00 1773.00 5.53 1.31 280.92 184.90 7.625 203.59 6.13 197.46 Pass ! 1824.16 1718.92 1900.00 1865.33 6.40 1.56 279.35 184.04 7.625 230.24 6.53 223.71 Pass 1915.52 1788.90 2000. 00 1956.33 7.37 1.82 278.29 183.05 7.625 256.85 7.01 249.85 Pass 2000.32 1852.03 2100. 00 2045.11 8.32 2.12 277.48 181.92 7.625 281.80 7.44 274.36 Pass 2084.45 1912.14 2200. 00 2131.18 9.32 2.47 276.90 181.06 7.625 305.63 7.89 297.73 Pass ', 2168.25 1969.38 2300. 00 2213.48 10.37 2.86 276.52 180.42 7.625 326.97 8.35 318.62 Pass 2255.89 I 2026.47 2400. 00 2291.60 11.50 3.29 276.49 180.22 7.625 345.53 8.83 336.70 Pass ! ~ BP Alaska Anticollision Report Company: BP AmoCO llate: 5/23/2006 Time: 12:05:07 Page: 2 Field: Prudhoe Bay Reference Site: PB L Pad Co-0rdinate(NF.) Reference: Well: Plan L-204 (S-U), True North Reference Welt: Plan L-204 (S-U) Vertical ("IVD) Reference: L-204 Plan S-U 78.6 Reference F~'ellpath: Plan L-204 OBc Db: Oracle Site: PB L Pad Well: L-104 Rule Assigned: Minor 1/200 Wellpath: L-104 V7 Inter-Site Error: 0.00 ft ..Reference ~ offset Semi-Nlajor Axis ~ Ctr-Ctr No-Co Allo»~able 1~D TVD MD '!'VD Ref OtTset 7~F©+AZI 'I'T=`p-HS Oasing/F1SDistance Area Deviation Warning ft ft _ft ' ft ft ft deg ......deg.. ~n ft ft ft 2354.91 2090.14 2500.00 2365.69 8.75 3.78 276.21 179.94 7.625 359.14 8.41 350.73 Pass 2454.62 2154.25 2600.00 2432.68 6.32 4.31 275.30 179.03 7.625 362.95 8.05 354.90 Pass 2554.08 2218.20 2700.00 2491.16 6.88 4.89 274.15 177.88 7.625 355.99 8.60 347.39 Pass 2652.89 2281.74 2800.00 2543.73 7.45 5.47 273.15 176.87 7.625 341.94 9.15 332.79 Pass 2751.49 2345.15 2900.00 2594.80 8.02 5.95 272.26 175.99 7.625 326.13 9.63 316.50 Pass ', ', 2849.66 2408.27 3000.00 2643.65 8.59 6.51 271.31 175.04 5.500 307.85 9.92 297.93 Pass 2947.27 2471.03 3100.00 2690.22 9.15 7.14 269.98 173.70 5.500 287.28 10.58 276.70 Pass i 3044.48 2533.54 3200.00 2735.38 9.71 7.78 268.14 171.86 5.500 265.57 11.40 254.17 Pass 'i 3141.53 2595.95 3300.00 2780.09 10.28 8.36 265.77 169.50 5.500 243.87 12.36 231.51 Pass ', 3238.76 2658.46 3400.00 2825.69 10.84 8.85 262.80 166.53 5.500 223.85 13.51 210.34 Pass 3336.12 2721.07 3500.00 2872.13 11.41 9.36 259.08 162.81 5.500 205.79 15.00 190.79 Pass 3433.49 2783.68 3600.00 2918.81 11.97 9.90 254.53 158.26 5.500 189,26 16.87 172.39 Pass 3530.71 2846.19 3700.00 2965.20 12.54 10.47 248.83 152.55 5.500 174.37 17.96 156.41 Pass 3627.97 2908.73 3800.00 3011.51 13.11 11.03 242.33 146.06 5.500 160,98 20.16 140.82 Pass 3725.48 2971.43 3900.00 3058.51 13.68 11.55 235.25 138.98 5.500 149.85 22.30 127.55 Pass ', 3823.42 3034.40 4000.00 3106.93 14.25 12.11 228.06 131.79 5.500 141.13 24.21 116.92 Pass 3921.44 3097.43 4100.00 3155.68 14.82 12.69 220.28 124.01 5.500 134.82 25.93 108.88 Pass ~'~ 4020.12 3160.88 4200.00 3207.35 15.40 13.24 213.46 117.19 5.500 131.36 27.21 104.15 Pass '~~ 4119.01 3224.48 4300.00 3260.02 15.97 13.76 207.02 110.75 5.500 129.15 28.19 100.96 Pass !, 4218.02 3288.14 4400.00 3313.15 16.55 14.29 200.78 104.51 5.500 127.77 28.94 98.83 Pass 4317.06 3351.82 4500.00 3366.47 17.13 14.83 194.58 98.31 5.500 127.79 29.51 98.29 Pass ', 4416.15 3415.54 4600.00 3420.11 17.71 15.37 188.63 92.35 5.500 129.44 29.91 99.53 Pass 4515.28 3479.28 4700.00 3474.13 18.29 15.92 183.09 86.82 5.500 132.89 30.19 102.70 Pass 4614.19 3542.88 4800.00 3526.68 18.87 16.49 177.13 80.85 5.500 137.19 30.35 106.84 Pass 4712.83 3606.31 4900.00 3577.60 19.45 17.08 170.76 74.49 5.500 142.62 30.38 112.24 Pass 4811.51 3669.76 5000.00 3628.74 20.02 17.64 165.01 68.73 5.500 149.47 30.32 119.15 Pass 4910.24 3733.24 5100.00 3680.19 20.60 18.20 159.98 63.71 5.500 157.88 30.21 127.67 Pass 5008.79 3796.61 5200.00 3730.74 21.18 18.79 155.28 59.01 5.500 168.32 30.04 138.28 Pass 5107.44 3860.05 5300.00 3781.72 21.76 19.36 151.12 54.85 5.500 178.78 29.83 148.95 Pass ', 5206.24 3923.57 5400.00 3833.47 22.34 19.93 147.64 51.37 5.500 189.51 29.64 159.87 Pass ', 5304.72 3986.90 5500.00 3883.68 22.91 20.53 144.30 48.02 5.500 202.50 29.40 173.10 Pass ', 5402.81 4049.97 5600.00 3932.22 23.49 21.15 141.39 45.12 5.500 218.80 29.17 189.63 Pass 5500.70 4112.92 5700.00 3980.11 24.06 21.77 138.93 42.66 5.500 236.69 28.97 207.72 Pass !~ 5598.44 4175.76 5800.00 4027.76 24,63 22.38 137.12 40.85 5.500 256.34 28.87 227.48 Pass 5696.24 4238.65 5900.00 4076.29 25.21 22.97 .136.02 39.74 5.500 276.55 28.90 247.66 Pass ~ 5798.16 4304.05 6000.00 4126.90 25.80 23.54 135.69 39.28 5.500 295.89 29.09 266.80 Pass 5918.47 4376.01 6100.00 4178.73 26.54 24.12 136.55 39.47 5.500 310.33 29.54 280.80 Pass ~, 6040.04 4440.30 6200.00 4231.21 27.32 24.69 138.29 40.60 5.500 317.21 30.11 287.09 Pass 6161.32 4495.55 6300.00 4283.35 28.12 25.26 140.47 42.22 5.500 316.13 30.67 285.46 Pass 6280.78 4540.90 6400.00 4334.48 28.91 25.84 143.15 44.40 5.500 308.08 31.17 276.91 Pass 6396.75 4576.01 6500.00 4385.40 29.68 26.41 146.59 47.38 5.500 292.63 31.53 261.10 Pass '~ 6507.75 4601.18 6600.00 4436.51 30.39 26.99 151.43 51.79 5.500 271.94 31.62 240.31 Pass 6611.73 4617.15 6700.00 4488.47 31.03 27.56 158.55 58.55 5.500 249.47 31.06 218.41 Pass 6702.35 4628.20 6800.00 4541.47 31.59 28.13 167.45 67.45 5.500 229.15 29.46 199.69 Pass 6821.99 4637.07 6900.00 4594.74 32.00 28.57 184.89 78.18 5.500 209.06 0.00 209.05 Pass 6905.96 4637.49 7000.00 4648.09 32.47 29.13 199.71 93.01 5.500 192.71 0.00 192.71 Pass 6989.85 4637.91 7100.00 4701.40 32.94 29.69 216.03 109.32 5.500 190.37 0.00 190.37 Pass ', 7073.32 4638.33 7200.00 4755.13 33.41 30.25 231.75 125.04 5.500 202.55 14.60 187.95 Pass ', 7157.35 4638.22 7300.00 4809.22 33.67 30.65 247.48 138.32 5.500 228.39 22.56 205.84 Pass ', 7233.41 4632.84 7400.00 4862.76 33.34 30.64 265.68 150.57 5.500 265.07 25.15 239.91 Pass 7304 67 4623.36 7500.00 4914.56 33.42 30.96 277.83 160.87 5.500 310.62 24.34 286.28 Pass • • ', Field: Prudhoe Bay ~ Site: PB L Pad ~~ __Wall, _o==:_= ~Pla~L-7n~~j} Wellpath: Plan L-204 OBc 0 loo 0 100 Travelling Cylinder Azimuth (TPO+AZI) [deg[ vs Cen[re to Centre Separation [IOOR/in] PERMIT TO DRILL 20 AAC 25.005 (e) if a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well branches are proposed from a single conductor, surface, or production casing, the applicant shall designate one branch as the primary welibore and include all information required under (c} of this section with the application for a Permit to Drill for that branch. I"or each subsequent well branch, the appl"ication for a Permit to Drill need only include information under jc) of this section that is unique to that branch and need not Include the $100 fee. • Terri Hubble BP Exploration AK Inc.. PO Box 196612 M6 7-5 Anchorage, AK 99519 -PAY TO THE ORDER OF AnchoragLe, AK 99501 ~~~~ " MEMO ""''~~ ~:i25200060~99L46227L556~~' 0284 "Mastercard Check" • as-sn z52 284 DATE ~~ s ~ OD. ~~ • • TRANSMITTAL LETTER CHECKLIST WELL NAME _~~!~ C",~6 PTD# Z ~~~ G ~l .Z-. Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-Olv'S TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing we I l (If last two digits in permit No. API No. 50- - - API number are , between 60-69) ~ Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f}, all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH} and API number (50- - -) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the ~ liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in ~ SAMPLE no greater than 30' sample intervals from below the permafrost or i from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for (name of well) until after (Company NameZhas designed and implemented a water well testing program to provide baseline data on water quality and quantity. _(Company NameZmust contact the Commission to obtain advance approval of such water well testing rogram. Rev: 1 /25!06 C:\jody\transmittal checklist - - __. _.._s._~ ~at~E ~. PERMIT CPjECi:LiST i field & Pool PRUDHOE SAY, ORION SCHR BLOIL-640135 !Mall Name: PRUDHOE BAY UN GRIN L-20.4. _ __Program Well bore seg ?T0~~20&0920 ~a~pany E~PFXPi_:;RATION'AL;"`KA)(NC __ _ _ initialGlassfr'vpe ~7-OIL_ GeoArea Unit _ On10ffShore ~n Annular Disposal Administrarion 1 Permit fee attached Yes Originating wellbore for 4 iatterals 2 pease numberappropriat~; ~'es 3 .Unique well name and number Yes - 4 bVell iocated in a defined poei Yes '5 Well located proper dstanca-from drilling unit boundary_ Yes 6 Well located proper distance frurr~ other wells Yes 7 .Sufficient acreage available in drilling unit Yes 8 If deviated, is wellbore plat included Yes 9 Operator only affected party.. Yes ',10 Operator has appropriate bond nforce - _ Yes ~11 Permit can be issued without conservation order.. Yes '12 Permit can be issued without administrative approval Yes Appr Date ' 13 Can permit be approved before 15-day wait- Yes RPC 6!2912006 14 Well Iccated wthin area and strata authorized by Injection Order # (put1O# in comments) (For. NA - 15 .All wells within 114 mile area of review identified (Far service well only) NA- 16 Pre-produced injector:. duration of pre production less-than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31,05,030(~.1,A),(j.2.A-D) No 18 Conductor string provided Yes 20" x 34" @ 110'. Engineering 19 Surface casing protects all known USDWs Yes '20 CMT vol adequate-to circulate on conducto[&surf csg - - Yes - Adequate excess. 21 CMTyoI adequate_to tie-in long string to surf csg_ No 22 CMT will cover all knownproductive horizons No_ Slotted.- 23 basing designs adequate for C, T, B &-permafrost.. Yes 24 Adequate tankage.or reserve pit - - - - - - Yes Nabors 9ES. ',25 If a re-drill, has a 10-403 for abandonment been approved - NA ..New well.. 126 Adequate wellbore separation-proposed. - - Yes - '27 If diverter required, does it meet regulations. Yes 28 Drilling fluid-program schematic & equip list adequate Yes , Max MW 9,6 ppg, Appr Date !29 BOPEs, do they meet. regulation - - _ - Yes WGA 6/30/2006 30 ROPE-press rating appropriate; test to (put prig in comments). - - Yes Test to 3500 psi. -MSP 15.58 psi. '131 Choke. manifold complies wlAPl RP•53 (.May 84) Yes - . ',32 Work will occurwithout operation shutdown_ - _ - - _ _ _ - Yes - ',33 Is presence_of H2S gas probable - _ _ _ No. _ - _ - - Not an H2S pad. x,34 Mechanical condition of wells within AOR verified (For-service well only) - NA - I ~ 35 Permit can be issued w!o_ hydrogen sulfide measures - No_ _ ~ Geolo 36 I Data_presented on potential overpressure zones NA- - - I37 Seismic analysis_of shallow gas zones NA- - - Appr Date I38 Seabed condition survey (if off-shore) - - NA- _ - RPC 612912006 ~39 Contact namelphone for weekly_progress reports. [exploratory only] NA C Geologic Engineering P Commissioner: Date: Commissioner: Date Com ssi ner Date