Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
206-093
• Image Proje~fi Well Hisfiory File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. - Q ~~ Well History File Identifier Organizing (done) ,~.o.,aea mumiuiimm Ae,v~~eea~ iuumi~umm RESCAN Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: ^ Other:: BY: Maria Date: © /s/ ~~ Project Proofing III IIIII IIIII II III BY: Maria Date: Q /s/ Scanning Preparation ~_ x 30 = ~ + c~~ =TOTAL PAGES~~ (Count does not include cover sheet) BY: Maria Date: `Q ,~ /s/ Production Scanning III II~IIIIIIII IIIII Stage 1 Page Count from Scanned File: ~_ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: _(~ YES NO BY: Maria Date:' / ~' IQ~' /s/ ~n/~ II"..--ii / Y r r Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO DIGITAL DATA iskettes, No. i ^ Other, No/Type: OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. III II II II I II II IIIII ReScanned IIIIIIIIIIIIII IIIII BY: Maria Date: lsl Comments about this file: a~,~„~~e~.~ iiiiuuiiiiimiii 10!6/2005 Well History File Cover Page.doc • ~~. ~~ :~ ..~ ~. ~~~, ~~. ..~~ ~,~ i ,, .~ ~- ~~. ~~~ ~ ~:. ~,x„ ~ "` x ,~ ,~, ,~- l .1~^a£ ~.; 4 MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc n~-zQ~g DATA SUBMITTAL COMPLIANCE REPORT 9/12/2008 Permit to Drill 2060930 Well Name/No. PRUDHOE BAY UN ORIN L-204L1 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23314-60-00 MD 11965 TVD 4770 Completion Date 9/3/2006 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Log s Run: MWD / GR / RES / AZI DEN / NEU /AIM / PWD (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data/ Digital Dataset Log Log Run Interval OH / Ty,{~ Med/Frmt Number Name Scale Media No Start Stop CH Received Comments I QED Las 15487 Induction/Resistivity 7020 11965 Open 10/3/2007 DCHO, DRHO, GR, NPHI, RHOB w/PDS graphics D Asc Directional Survey 0 11965 Open 10/4/2006 ~pt Directional Survey 0 11965 Open 10/4/2006 ;BD C Lis 15705 Induction/Resistivity 486 11964 Open 11/19/2007 LIS Veri, GR, ROP, FET, RPS, RPD, DRHO, NPHI, w/PDS and Tif graphics ~g 15705 Induction/Resistivity 2 Blu 6804 11965 Open 11/19/2007 MD Vision Service 7-Aug- 2007 ~.dg 15705 Induction/Resistivity 2 Blu 6804 11965 Open 11/19/2007 TVD Vision Service 7-Aug- 2007 Well Cores/Samples Information: Name ADDITIONAL INFORMATION Well Cored? Y Chips Received? Y'7'RT'- Analysis ~~ Received? Sample Interval Set Start Stop Sent Received Number Comments Daily History Received? ~/ N Formation Tops ~~ N Comments: DATA SUBMITTAL COMPLIANCE REPORT 9/12/2008 Permit to Drill 2060930 Well Name/No. PRUDHOE BAY UN GRIN L-204L1 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23314-60-00 MD 11965 TVD 4770 1Co~pletion Date 9/3/2006 Completion Status 1-OIL Current Status 1-OIL UIC N Compliance Reviewed By: Date: 11 /09/07 i Sc6lumUerger Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Log Description NO. 4491 Company: Alaska Oil & Gas Cons Comm AHn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Orion Date BL Color CD L-204 40013758 OH MWDILWD EDIT - 08102106 2 1 L-204L1 40013758 OH MWDILWD EDIT 08107106 2 1 L-204L2 40013758 OH MWDILWD EDIT - 08/12106 2 1 L-204L3 40013758 OH MWDILWD EDIT 08/20106 2 1 L-204L4 40013758 OH MWDILWD EDIT 08129/06 2 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2 9 -"- 900 EBenson Blvd. }~ "- ~}^ ft Anchorage AK 99508-4254 ~' '' ,~~ ~~-~ ~~~- ", y ,"""' -~'' Date Delivered, n '' '` -"r 1[1ti~ ,~ ? ~.: v y at r....., . r Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503- 38 ATTN: Beth _...i ' i Received by: Date 09-20-2007 Transmittal Number:92904 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) have any questions, please contact llouglas llortch at trie Yll(.; at Jb4-4y is Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 09-15A aa'; ' ua 9 '~ ~ S~hri _. _ ____ AGI-10A~o~-~3S ~` i5~/~a _ _ - _ ___ F-01A c~0(o-t0~ ~ I's~1~3 =a5~/~`/ F-01 APB1 F-096ao~-vt3 ~-~5y1s5 _ _ _ _ F-42A av~- U~3 '' 15~/K~ L-204L1 a~-v~i3 ~ t 5~/~ ~ L-204L2 avCo- 09 ~l " tS~/~5~ L-204L3 a(>(o-OAS ~t5`l~9 L-204L4 a U(o-p~ ~, +~ t Sc/ cl ~ V-205L1 c7UCo-l?f! ~ IS~I$a V-205L2 aU(o_1~a ~ 15~-x`i3 W-204L1_c2Ufo-1.59 ~ t'S4/ W-204L2 av~-/U O ~' /~~/4 5 WG1-09_ U_'zc_~aL - /y!~ ~ 15'V9~ ,~ a 1. Please Sign and Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2- l 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 is' ~vGv -~ ~ 06 ~~~ ~ g ~ STATE OF ALASKA (X~,,p ALASKA OIL AND GAS CONSERVATION COMMISSION ~~~r ~iaska~dfE~~~6A1lt~L~fa~~~~R RECOMPLETION REPORT AND LOG ~,nchc~a~e Revised: 12/27/06, Put on Production 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zoAAC zs.~os zoAAC zs.»o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1 b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Ab nd. 9/3/2006 ~ ee D 7' 12. Permit to Drill Number 206-093 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 8/3/2006 13. API Number 50-029-23314-60-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 8/5!2006 ~ 14. Well Name and Number: PBU L-204L1 FSL, 3544 FEL, SEC. 34, T12N, R11 E, UM 2423 Top of Productive Horizon: 1909' FSL, 527' FWL, SEC. 35, T12N, R11 E, UM (OBd) 8. KB Elevation (ft): 78.6' ~ 15. Field /Pool(s): Prudhoe Bay Field / Orion Total Depth: 73' FNL, 274' FWL, SFC. 01, T11N, R11E, UM 9. Plug Back Depth (MD+TVD) 11965 + 4770 Ft Schrader Bluff 4b. Location of Well (State Base Plane Coordinates): Surface: x- 583372 y- 5978147 Zone- ASP4 10. Total Depth (MD+TVD) 11965 + 4770 Ft 16. Property Designation: ADL 028240 TPI: x- 587449 y- 5977679 Zone- ASP4 Total Depth: x- 592501 y- 5975757 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD / GR / RES / AZI DEN ! NEU /AIM / PWD 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVO HOLE AMOUNT SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 4-1/2" 12.6# L-80 6229' 11965' 4517' 4770' 6-3/4" Uncemented Slotted Liner 23. Perforations open to Production (MD + TVD of Top and 24. TUBING RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD 4-1/2" Slotted Section MD TVD MD TVD 6688' - 7103' 4634' - 4646' 7233' - 9411' 4653' - 4726' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9875' - 11923' 4739' - 4769' DEPTH INTERVAL MD AMOUNT Sc KIND OF MATERIAL USED 7018' Kicked Off Aluminum Billet for L-204L1 26. PRODUCTION TEST Date First Production: Reported on L-204 Method of Operation (Flowing, Gas Lift, etc.): See L-204 10-407 (Dated 12/27/06, PTD #206-092) for Production & Test Data Date of Test Hours Tested PRODUCTION FOR TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing Press. Casing Pressure CALCULATED 24-HOUR RATE• OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none . ~ ,~~,t ~~ ' bb None Q~-----"_' }• .~y ~fi ~i~r.. i"i~s. Form 10-407 Revised 12/2003 (,~. ~ ~L JUL Q ~, ?~~] °-~ ~+- [ y{ //ll''//~~ONTINUED ON REVERSE .SIDE 28. GEOLOGIC MARKER 29. ORMATION TESTS Include and briefly summarize test results. List intervals tested, Name MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Schrader Bluff OBd 6501' 4604' None 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si d ' ~~7~ gne ~(0 Terrie Hubble Title Technical Assistant Date PBU L-204L1 206-093 Prepared ByName/Number. Terrie Hubble, 564-4628 Well Number Permit No. / A royal No. Drilling Engineer: Scott Kolstad, 564-5347 INSTRUCTIONS GeNeRn~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only STATE OF ALASKA ALASK~IL AND GAS CONSERVATION COM SION ~.~~rv~D U~.T 0 4 2006 WELL COMPLETION OR RECOMPLETION REPORT AND LQGka Dil & Gas Cons. Commission Anchorage 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zoAACZS.~os zoAaczs.~~o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1 b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 9/3/2006 12. Permit to Drill Number 206-093 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 8/3/2006 13. API Number 50-029-23314-60-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 8/5/2006 14. Well Name and Number: PBU L-204L1 2423 FSL, 3544 FEL, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 1909' FSL, 527' FWL, SEC. 35, T12N, R11 E, UM (OBd) 8. KB Elevation (ft): 78.6' 15. Field /Pool(s): Prudhoe Bay Field / Orion Total Depth: 73' FNL, 274' FWL, SEC. 01, T11N, R11E, UM 9. Plug Back Depth (MD+TVD) 11965 + 4770 Ft Schrader Bluff 4b. Location of Well (State Base Plane Coordinates): Surface: x- 583372 y- 5978147 Zone- ASP4 10. Total Depth (MD+TVD) 11965 + 4770 Ft 16. Property Designation: ADL 028240 TPI: x- 587449 y- 5977679 Zone- ASP4 Total Depth: x- 592501 y- 5975757 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD / GR / RES 1 AZI DEN / NEU /AIM / PWD 22. CASING, LINER AND CEMENTING RECORD CASING SETTING' DEPTH MD- SETTING DEPTH.:TVD HOLE AMOUNT .SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM . SIZE CEMENTING REGORD PULLED 4-112" 12.6# L-80 6229' 11965' 4517' 4770' 6-3/4" Uncemented Slotted Liner 23. Perforations open to Production (MD + TVD of Top and 24. TU81NG RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD 4-1/2" Slotted Section MD TVD MD TVD 6688' - 7103' 4634' - 4646' 7233' - 9411' 4653' - 4726' 25> ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9875' - 11923' 4739' - 4769' DEPTH INTERVAL MD AMOUNT H~ KIND OF MATERIAL USED 7018' Kicked Off Aluminum Billet for L-204L1 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test Hours Tested PRODUCTION FOR TEST PERIOD OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing Press. Casing Pressure CALCULATeD 24-HOUR RATE• OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submlt core chips; if none, state "none". None ~ ,° ATE •~ ~ o~ GU~~~ ~~l o ^""~7~~ j ~~ j Form 10-407~I~e 003 ~ 1 t ~ ~ QQNTINUED ON REVERSE SIDE r ~.-` ~~~ ~ ~ ~~ ~, ~. - ~ t~INS ~F~. C,CT ~ Zoos ~ 28. GEOLOGIC MARKS 29. ORMATION TESTS Include and brie summarize test results. List intervals tested, NAME MD ND and attach detailed supporting data as necessary. If no tests were conducted, state "None". Schrader Bluff OBd 6501' 4604' None 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. / Signed Terrie Hubble '~ Title Technical Assistant Date lOl ~~~~ PBU L-204L1 206-093 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / A royal No. Drilling Engineer: Scott Kolstad, 564-5347 INSTRUCTIONS GeNerua~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only BP Page 1 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 7/15/2006 14:00 - 15:00 1.00 RIGD P PRE Rig released from L-2171. Ready rig floor, unpin topdrive, bridle up traveling blocks. 15:00 - 16:00 1.00 MOB P PRE Move mud pits around pad. Made "critical lift" for removal of diverter lines from L-2171 out of critical path. 16:00 - 17:00 1.00 RIGD P PRE PJSM. Lower pipe chute, lay down derrick. 17:00 - 18:30 1.50 MOB P PRE PJSM. Jack rig up and move off of L-217i. Move rig around pad. 18:30 - 21:30 3.00 DIVRTR P PRE Nipple up Diverter stack and lines due to lack of space behind rig. See "Daily Operational Comments". 21:30 - 23:00 1.50 MOB P PRE PJSM. Position rig in front of conductor. 23:00 - 00:00 1.00 MOB P PRE Lay matting boards and herculite for rig. .7/16/2006 00:00 - 01:00 1.00 RIGU P PRE PJSM. Spot rig over conductor. Set matting boards in place. Level rig and set rig down in place. 01:00 - 02:00 1.00 RIGU P PRE Laydown herculite under mud pit complex. Spot mud pits in place and set matting boards. Set down mud pits down. 02:00 - 03:00 1.00 RIGU P PRE PJSM. Raise and pin derrick. 03:00 - 03:30 0.50 RIGU P PRE Take on Spud Mud in mud pits. Raise and pin pipe chute. 'Accept rig ~ 00:00 hr 7/16/2006. (Backed up 3 hrs due to previous Diverter installation). 03:30 - 04:00 0.50 RIGU P PRE Make up kelly hose to topdrive. 04:00 - 05:00 1.00 RIGU P PRE Bridle down, pin traveling blocks to topdrive. 05:00 - 07:30 2.50 DIVRTR P PRE Change out riser from 16" to 20". Nipple up 20" riser. Install dresser sleeve and tum-buckles. 07:30 - 08:30 1.00 RIGU P PRE Rig up rig floor, remove spreader beam over iron roughneck. Inspect topdrive quill - OK. Put all floor equipment in it's proper place. 08:30 - 09:00 0.50 RIGU P PRE Service topdrive and crown section. 09:00 - 11:00 2.00 RIGD P PRE Continue load and strap 4" drillpipe and HWDP in pipe shed. 11:00 - 12:00 1.00 RIGU P PRE Cut and slip drilling line 76'. 12:00 -12:30 0.50 RIGU P PRE Attempt to pick up drillpipe to rack back in derrick. Hft ice plug ~ 40 feet. 12:30 - 13:00 0.50 RIGU P PRE Pick up and make up 13.5" bit, NBSTB, and crossover to drillpipe to drill ice plug. 13:00 - 13:30 0.50 DIVRTR P PRE Function test diverter system. Perform accumulator test. Witnessing of test waived by AOGCC rep Chuck Shieve. Witnessed by NAD TP Kelly Cozby. "Note: Crew held Pre-Spud meeting during their Pre-Tour meeting. 13:30 - 14:30 1.00 RIGU P PRE Fill conductor and check for leaks - OK. Cleanout ice from 40' to 105'. Laydown bit and NBSTB 14:30 - 18:00 3.50 RIGU P PRE Pick up drillpipe, HWDP, jar stand, and rack back in derrick. 18:00 - 21:00 3.00 RIGU P PRE Pick up and make up 13.5" directional BHA #1. Bit - RR1 MX-C1, 1.83 deg PDM. Orient motor with MWD. 21:00 - 22:00 1.00 RIGU P RE Rig up Gyro Data and Sperry W L. 22:00 - 22:30 0.50 RIGU P PRE Pressure test mud lines, stand pipe and mud manifold to 3,500 psi - OK. 22:30 - 00:00 1.50 DRILL P SURF Spud in L-204 ~ 22:30 hr 7/16 2006. Drill 13.5" surface hole from 109' to 263'. 500 gpm, 520 psi, 40 rpm, 780 fUlbs torque. PU, SO, RT - 55k. ART - .34 hr. Lost 200 bbls. spud mud immediatly after drilling out of conductor cement, to app. 325 ft. treated with Poly Pac Supreme to heal losses. Printed: 9/5/2006 2:49:57 PM gp Page 2 of 31 Operations Summary Report , Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT ' `Phase Description of Operations 7/17/2006 00:00 - 01:30 1.50 DRILL P SURF Continue drilling 13.5" surface hole from 263' to 447'. Started kick-off ~ 300'. Gyro survey every stand. 550 gpm, 780 psi on, 730 psi off. 40 rpm, 3k TO on, 1.5k TO off. PU - 65k, SO - 64k, RT - 65k, WOB - 30k. 01:30 - 02:00 0.50 DRILL P SURF POH from 447' to 170'. Pick up jar stand. 02:00 - 02:30 0.50 DRILL P SURF Run in hole from 170' to 447' without problem. 02:30 - 12:00 9.50 DRILL P SURF Continue drilling directionally from 447' to 1,097'. Continue gyro surveys every stand to last survey ~ 1,097' (bit depth). 700 gpm, 2,130 psi on, 2,010 psi off, 60 rpm, 4.5k TO on, 2k TO off. PU - 72k, SO - 65k, RT - 70k, WOB - 30k. Backream 30' prior to connections. ART - 1.73 hrs, AST - 4.6 hrs. 12:00 - 12:30 0.50 DRILL P SURF Rig down Sperry WL and Gyro Data tools. 12:30 - 16:30 4.00 DRILL P SURF Continue drilling directionally from 1,097' to 1,670'. 700 gpm, 2,400 psi on, 2,200 psi off, 60 rpm, 3.7k TO on, 1.7k TO off. PU - 80k, SO - 70k, RT - 75k, WOB - 35k. Backream 30' prior to connections. ART - 1.75 hrs, AST - 3.18 hrs. 16:30 - 18:00 1.50 DRILL P SURF Circulate bottoms up 3 times ~ 700 gpm, 2,465 psi, 60 rpm, 2.1 k TO. Hole unloaded good amount of clay balls during circulation. Circulated until shakers cleaned up. 9.1 ppg MW, 300 Vis. 18:00 - 19:00 1.00 DRILL P SURF Monitor well - OK. POH from 1,670' to 269'. Had 1 stand swabbing from 1,060' to 1,040'. Wiped full stand through several times and quit swabbing. No other problems. 19:00 - 21:00 2.00 DRILL P SURF Laydown UBHO sub, bit, and adjust motor from 1.83 deg to 1.5 deg. Make up new bit #2 MX-C1 and stabilizer. 21:00 - 22:30 1.50 DRILL P SURF Run in hole with BHA #2 to bottom ~ 1,670' without problem. 22:30 - 23:00 0.50 DRILL P SURF Circulate bottoms up ~ 500 gpm, 2,150 psi, 60 rpm, 2k TO. Returned large amount of clay on bottoms up. 23:00 -00:00 1.00 DRILL P SURF Continue drilling directionally from 1,670' to 1,770'. 700 gpm, 2,585 psi on, 2,250 psi off, 60 rpm, 4.7k TO on, 2.8k TO off. PU - 80k, SO - 70k, RT - 75k, WOB - 35k. Backream 30' prior to connections. ART - .38 hrs. "No mud losses for the day. Start cutting viscosity back towards target of 200-250 ~ flowline. 7/18/2006 00:00 - 08:30 8.50 DRILL P SURF Continue drilling directionally from 1,770' to TD ~ 3,470' MD, 2,786' TVD. 680 gpm, 3,420 psi on, 3,350 psi off, 80 rpm, 5.6k TO on, 3.4k TO off. PU - 114k, SO - 79k, RT - 93k, WOB - 30k. Backream 30' pror to connections. Reduced pump rate to 680 gpm's due to pump liner limitations. Cut viscosity back to 200-250 ~ flowline. "Encountered 1st hydrates ~ 2,070' and continued to TD. Hydrates were very light and didn't cause any problems. TD 13.5" Surface Hole ~ 08:30 hr 7/18/2006. 08:30 - 10:30 2.00 DRILL P SURF Circulated 3 times bottoms up ~ 700 gpm, 3,370 psi, 100 rpm, 3.9k TO. 9.7 ppg MW. 10:30 - 12:00 1.50 DRILL P SURF Monitor well - OK. Short trip from 3,470' to 1,670'. PU - 125k, SO - 75k. Intermittent overpull 15-20k through base of permafrost and transition zone. Wiped clean through overpull areas. Observed small amount hydrates breaking out during trip with no effect on trip. No pumping or rotating when wiping hole. 12:00 - 13:30 1.50 DRILL P SURF Run in hole from 1,670' to 3,470' without problems. Re-wiped base of permafrost and transition zones without pumping or rotating. Printed: 9/5/2006 2:49:57 PM BP -Page 3 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From = To Hours Task Code NPT .Phase Description of Operations 7/18/2006 13:30 - 15:30 2.00 DRILL P SURF Circulate and condition mud 3 times bottoms up ~ 700 gpm, 3,365 psi ICP, 3,030 FCP. 100 rpms, 4.9k TO, PU - 120k, SO - 80k, RT 118k. Returned large amounts of clay back early prior to bottoms up. Shakers cleaned up after 2nd bottoms up. 9.6 PP9 MW. 15:30 - 18:00 2.50 DRILL P SURF Monitor well - OK. POH to run casing from 3,470' to 269'. Wipe through base of permafrost and transition zone without pumping or rotating. 18:00 - 20:00 2.00 DRILL P SURF Laydown BHA #2. Layed down all STABs, NM lead DC, MWD, motor and bit. 20:00 - 21:00 1.00 DRILL P SURF Clear rig floor of drilling tools. Clean mud off of rig floor. 21:00 - 23:30 2.50 CASE P SURF Rig to run 10 3/4" casing. Make dummy run with fluted casing hanger and landing joint. 23:30 - 00:00 0.50 CASE P SURF PJSM. Pick up and make up 103/4" 45.5# K-55 BTC casing shoe track. Baker-Lok 1st 3 joints with make up to mark ~ 7,500 ft/Ibs torque. Check floats - OK. 'No mud losses for the day. 7/19/2006 00:00 - 04:00 4.00 CASE P SURF Continue running in hole with 10 3/4" 45.5# K-55 BTC surface casing from 120' to 1,850' without problem. PU - 140k, SO - 80k. Ran in hole filling every joint with casing fill-up tool ~ 80 fpm with full displacement. Started pushing mud away between 1,850 to 2,030' where the casing started taking weight. Lost appx 6 bbis. Make up casing using Best-O-Life 2000 pipe lubricant. Used 25 bowspring centralizers on the 1st 25 joints. 04:00 - 05:00 1.00 CASE P SURF Circulate bottoms up while working pipe between 2,030' and 2,090' Staged pumps up to 6.5 bpm, 400 psi. Lost appx 20 bbls while establishing circulation with hole partially packing off. Had full retums without losses after rate was up to and over 3 bpm. Returned good amount of clay early back to shakers. Shakers cleaned up after initial clay came up. 05:00 - 07:30 2.50 CASE P SURF Run in hole from 2,090' to 2,160 without pumping. Set down ~ 2,160' and started washing from 2,160' to 2,360' ®5 bpm, 390 psi. No mud losses. 07:30 - 09:00 1.50 CASE P SURF Run in hole from 2,360' to 2,625 without pumping. Set down ~ 2,625'. No mud losses 09:00 - 11:30 2.50 CASE P SURF Stage pumps up to 5 bpm with good retums. Precautionary wash from 2,625' to 3,450' ~ 5 bpm, 420 psi. No mud losses. 11:30 - 12:00 0.50 CEMT P SURF Land casing on depth with shoe ~ 3,457'. Laydown casing fill-up tool, make up cement head. PU - 175k, SO - 100k. Ran total of 82 joints of 10.75" 45.5# K-55 BTC casing. Float collar ®3,371' 12:00 - 15:30 3.50 CEMT P SURF Circulate and condition mud to a 55 vis and YP of 14. 8.2 bpm, 400 psi, PU - 225k, SO - 100k. Reciprocated pipe throughout circulation in 3 ft. strokes due to hanger hanging up in the diverter stack. No mud losses. Held cementing PJSM while circulating. 15:30 - 19:00 3.50 CEMT P SURF Switch over to Dowell. Pump 5 bbls of water. Pressure test lines to 3,500 psi - OK. Pump 80 bbis of 10.1 ppg MudPush II spacer ®5.5 bpm, 25 psi ICP, 115 psi FCP. Shut down and drop bottom plug. Mix and pump 477 bbls, 597 sx of 10.7 ppg of Arctic Set Lfte lead cement slurry ®6 bpm, 140 psi ICP, 280 psi FCP. Mix and pump 97 bbls, 468 sx of 15.8 ppg Class Printed: 9/5/2006 2:49:57 PM ., , .,; BP - : Page 4 of 31 ~perationsSulmmary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 7/19/2006 15:30 - 19:00 3.50 CEMT P SURF "G" tail cement slurry ~ 5.8 bpm, 360 psi ICP, 280 psi FCP. Shut down and drop top plug. Kick out plug with 5 bbls of water. Switch over to rig. Displace cement with 320 bbls of 9.5 ppg mud. 1st 310 bbls ~ 8 bpm 266 psi ICP, 765 psi FCP. Remaining 10 bbls pumped ~ 4 bpm, 600 psi ICP, 680 FCP. Bumped plug with 2,000 psi ~ 98% pump efc. CIP ~ 18:45 hr. Bleed off pressure and check floats - OK. Observed contaminated cement to surface with 122 bbls of displacement away. Returned prime cement with 201 bbls of displacement away. Stopped reciprocating and set casing on landing ring with 216 bbls of displacement away. 129 total bbls of sidewalk cement back to surface. Had full returns throughout cementing and displacement. 19:00 - 20:00 1.00 CEMT P SURF Flush diverter stack and lines. Rig down cement head, lay down landing joint. 20:00 - 22:00 2.00 CASE P SURF Rig down casing tools, change out bales, and clear floor. 22:00 - 00:00 2.00 DIVRTR P SURF Nipple down diverter system. 7/20/2006 00:00 - 01:30 1.50 DIVRTR P SURF Continue cleaning and nipple down of diverter system. Pick up diverter stack and secure in cellar. Change out riser nipple from 20" to 16". 01:30 - 04:00 2.50 WHSUR P SURF Make up casing head and test metal to metal seals to 1,000 psi - OK. Nipple up tubing spool. 04:00 - 06:00 2.00 BOPSU P SURF Nipple up BOPE. 06:00 - 07:00 1.00 BOPSU P SURF Jack up rig and place cribbage under sub to level rig. 07:00 - 08:00 1.00 BOPSU P SURF Continue nipple up of BOPE. 08:00 - 08:30 0.50 BOPSU P SURF Pick up jet sub and flush stack prior to BOPE test. 08:30 - 09:30 1.00 BOPSU P SURF Rig up to test BOPE. 09:30 - 13:00 3.50 BOPSU P SURF Test all BOPE's to 250 psi low, 3,500 psi high for 5 minutes each. Perform accumulator test. Test witnessed by AOGCC rep John Crisp, BP WSL Alan Madsen, NAD TP Kelly Cozby. 13:00 - 13:30 0.50 BOPSU P SURF Rig down BOP test equipment. 13:30 - 14:00 0.50 WHSUR P SURF Install wear bushing. 14:00 - 17:00 3.00 DRILL P INTi Pick up drill pipe out of pipe shed to 1,600' then POH racking back in derrick. 17:00 - 19:00 2.00 DRILL P INT1 PJSM. Pick up and make up BHA # 3. 9 7/8" Re-built DSX147, 1.5 deg PDM, ARC, ADN. Load nuclear sources and orient MW D to motor. 19:00 - 19:30 0.50 DRILL P tNT1 Run in hole with BHA # 3 on HWDP to 996'. Shallow hole test MWD - OK, 617 gpm, 1,220 psi. 19:30 - 21:00 1.50 DRILL P INTi Run in hole picking up drill pipe out of pipe shed from 996' to 3,204'. Placed ghost reamer 1,675' above bit. 21:00 -22:00 1.00 DRILL P INT1 Circ air out of drill pipe. Pressure test 10314" 45.5# K-55 BTC casing to 2,500 psi / 30 minutes - 0 psi loss. 22:00 -00:00 2.00 DRILL P INT1 Wash down and tag top of cement ~ 3,365'. Drill out cement, float collar on depth ~ 3,370'. Continue drilling out shoe track to 3,430'. 600 gpm, 2,695 psi, 60 rpm, 7.6k TO, PU - 120k, SO - 75k, RT - 93k. 7/21/2006 00:00 - 00:15 0.25 DRILL P INT1 Continue drilling cement, shoe, and rathole from 3,430' to 3,470. 600 gpm, 2,395 psi, 60 rpm, 5.7k TO. Started displacing hole 5' prior to drilling out shoe. 00:15 -00:30 0.25 DRILL P INT1 Drill new 9 7/8" hole from 3,470' to 3,490' with same parameters. Printed: 9/5/2006 2:49:57 PM BP Page 5 of 31 Operations. Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 7/21/2006 00:30 - 01:30 1.00 DRILL P INT1 Continue displacing well from 9.5 ppg spud mud to 8.8 ppg LSND mud ~ 250 gpm, 460 psi. Only able to get 1 empty Vac truck for job and offload from mud pits ~ 6 bpm. 01:30 - 02:00 0.50 DRILL P INT1 Perform LOT. MD - 3,457', TVD - 2,778', MW 8.8 ppg, Leak off pressure - 610 psi, EMW - 13.02 ppg 02:00 - 02:30 0.50 DRILL P INT1 Perform benchmark ECD's and slow pump rates. CECD - 9.24 02:30 - 12:00 9.50 DRILL P INT1 PPg• Directionally drill from 3,490' to 5,690'. 700 gpm, 2,660 psi on, 2,450 psi off, 80 rpm, 7.4k TO on, 7k TO off, PU - 140k, SO - 85k, RT - 107k, W OB - 25k. AST - .56 hrs, ART - 4.67 hrs. CECD - 9.69 ppg, AECD - 9.92 ppg. Pumped 30 bbls high vis sweep ~ 4,100' with no increase in cuttings with bottoms up. Pumped 35 bbls high vis, 1.5 ppg over, weighted sweep ~ 5,670' with same results. 12:00 - 21:00 9.00 DRILL P INTt Directionally drill from 5,690'. to TD ~ 6,680' MD, 4,632' TVD. 700 gpm, 3,260 psi on, 3,160 psi off, 80 rpm, 9.2k TO on, 7.2k TO off, PU - 146k, SO - 88k, RT - 115k, WOB - 20k. AST - 4.15 hrs, ART - 1.55 hrs. CECD - 9.79 ppg, AECD 9.90 ppg. Pumped 38 bbls high vis, 1.5 ppg over, weighted sweep ~ 6,646' 'Preliminary Formation Tops OA ~ 5,935' MD, 4,371' TVD OBa ~ 6,070' MD, 4,444' TVD OBb ~ 6,165' MD, 4,489' TVD OBc ~ 6,318' MD, 4,551' TVD OBd ~ 6,506' MD, 4,605' TVD 21:00 - 21:30 0.50 DRILL P INT1 Finish pumping sweep out of hole. No increase in cuttings with bottoms up. Take final survey. 21:30 -00:00 2.50 DRILL P INT1 MadPass log from 6,680' to 6,069' (bit depth) ~ 600 fph. 700 gpm, 2,990 psi, 80 rpm, 6.8k TO. No problems. No mud losses. 7/22/2006 00:00 - 01:00 1.00 DRILL P INT1 Continue MadPass log from 6,069' to 5,650' (bit depth) ®600 fph. 700 gpm, 2,900 psi, 80 rpm, 5k TO. No problems. 01:00 - 04:00 3.00 DRILL P INT1 Backream to shoe from 5,650' to 3,457' ~ 1,800 fph. 700 gpm, 2,300 psi, 80 rpm, 4.6k TO. No problems. 04:00 - 04:30 0.50 DRILL P INT1 Circulate bottoms up while rotating out 3 stands to 3,127'. 700 gpm 2,200 psi, 80 rpm, 4.5k TO. 30°~ increase in cuttings (clay balls) on bottoms up. Circulate shakers clean. 04:30 - 05:00 0.50 DRILL P INT1 Service topdrive, drawworks, and crown. 05:00 - 07:30 2.50 DRILL P INT1 POH for MDT logs from 3,127' to 164'. 07:30 - 09:30 2.00 DRILL P INT1 PJSM. Laydown nuclear source. Laydown remainder of BHA #3. 09:30 -10:00 0.50 DRILL P INT1 Clear and clean rig floor. 10:00 -12:00 2.00 EVAL P INT1 Rig up Schlumberger W iretine for MDT logs. 12:00 -13:00 1.00 EVAL P NT1 Surface test logging tools. Tests failed. Expedite tool from Deadhorse. 13:00 - 16:30 3.50: EVAL N SFAL INT1 Rig down tools to trouble shoot packer assembly. Change out packer and test same - OK. Make up tools and surface test logging assembly -Test failed. 16:30 -19:30 3.00 EVAL N SFAL INT1 Continue trouble shoot logging tools. Narcowed failure down to 2 different tools. Unable to repair on location. 19:30 - 21:00 1.50 EVAL N SFAL INT1 Rig down SLB to send tools to SLB shop. Clear floor. Yfllrt60: `Jlacw° c:•y:D/ rm gp Page 6 of 31 Operations Summalry Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7h 6/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT `Phase Description of Operations 7/22/2006 21:00 - 22:00 1.00 EVAL N SFAL INTt Prepare to pick up dumb iron cleanout assembly. Bring bit and NBSTAB to floor. Load pipe shed with 5" HWDP. 22:00 -00:00 2.00 EVAL N SFAL INT1 Make up cleanout assembly (BHA #4). 9 7/8" RR bit (from BHA #3), NBSTAB, 4 joints 5" HWDP, Jar, 4 joints 5" HWDP, XO, 24 joints 4" HWDP. 7/23/2006 00:00 - 01:00 1.00 EVAL N SFAL INT1 Run in hole to 3,409' with cleanout assembly due to SLB MDT tool failure. `Received call from SLB WL supervisor Bob Templeton ~ 12:15 hr to notify us that no progress had been made on trouble shooting the logging tools. They have Houston SLB laths helping trouble shoot. 01:00 - 03:30 2.50 EVAL N SFAL INT1 Fill pipe and circulate a bottoms up ~ 336 gpm, 580 psi, 40 rpm, 2.2k TO. Circulate another bottoms up ~ 710 gpm, 2,050 psi, 120 rpm, 2.1 k TO. Did not return any increase in cuttings on bottoms up. Slow pump rate to 113 gpm, 100 psi while waiting on SLB. '02:25 hr, called SLB on progress -making progress. `02:45 hr, SLB called on progress -not sure, but maybe -doing some final tests. '03:20 hr, SLB called on progress -tool good to go. Found broken component in the pump out tool. 03:30 - 04:15 0.75 EVAL N SFAL INT1 Run in hole from 3,409' to ~ 5,400' without problems. Set down ~ 5,400'. 04:15 - 04:45 0.50 EVAL N SFAL INT1 Attempt to work down without pump with no success. Make up topdrive, fill pipe and establish circulation with 200 gpm, 400 psi. Fell through immediately while pumping and no rotation. Wipe through several times with and without pump and no indication of drag. Continue running in hole from 5,400 to 5,945' with no pumps of rotation. Washed by from 5,945' to 5,990'. RIH from 5990 to 6,118' with no pumps or rotation. Set down ~ 6,118'. 04:45 - 05:00 0.25 EVAL N DPRB INTt Attempt to work down with pump without success ~ 200 gpm, 425 psi. Rotate and fall through tight spot ~ 6,118' and wash stand down to 6,182', 30 rpm, 1.8k TO, PU - 135k, SO - 80k, RT - 100k. Backream up to tight spot ~ 6,118' and stuck pipe. Not able to go down or up. Full circulation. SLB tools back on location ~ 05:00 hrs. 05:00 - 12:30 7.50 EVAL N STUC INT1 Work stuck pipe ~ 6,118'. Attempt to torque and slump drill pipe down with different pump rates from 200 gpm to 400 gpm without success. Had full circulation without any packoff indications. Jar down on pipe with and without pumps with good jar action. Pump rates varied from no pump up to 600 gpm, 2,100 psi. Tried various torques and slump. Pipe came free from jarring down without torque. 12:30 - 13:00 0.50 EVAL N DPRB INT1 Wash stand down to 6,183' then backream from 6,183' to 6,087' ~ 600 gpm, 2,060 psi, 100 rpm, 4k TQ. Tight area cleaned out. 13:00 - 14:00 1.00 EVAL N SFAL INT1 Continue running hole from 6,087' to 6,565' with and without pumps, washing through minor tight spots as needed. Precautionary wash to bottom from 6,565' to 6,680'. 14:00 - 14:30 0.50 EVAL N SFAL INT7 Circulate bottoms up ~ 600 gpm, 2,130 psi, 120 rpm, 4k TQ. Printed: 9/5/2006 2:49:57 PM gp Page 7 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7h 5/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 7/23/2006 14:00 - 14:30 0.50 EVAL N SFAL INT1 Very little cuttings back during circulation. 14:30 - 15:30 1.00 EVAL N SFAL INT1 Circulate and pump a high vis, weighted sweep ~ 1.5 ppg over. 650 gpm, 2,450 psi. No increase in cuttings with sweep back to surface. MW - 9.1+ppg. 15:30 - 18:00 2.50 EVAL N SFAL INT1 Monitor well - OK. POH from 6,680' to 3,409'. Worked and re-wiped through minor tight spots ~ 5,968', 5,660', and 5,400'. 18:00 - 19:30 1.50 EVAL N SFAL INT1 Monitor well ~ shoe - OK. Continue POH from 3,409' to 1,021'. 19:30 - 20:30 1.00 EVAL N SFAL INT1 Stand back 4" and 5" HWDP. Break bit, leave NBSTAB on HWDP for next cleanout run. 20:30 - 21:00 0.50 EVAL N SFAL INT1 Clear and clean rig floor. 21:00 -00:00 3.00 EVAL N SFAL INT1 PJSM with SLB WL. Rig up and start surface testing MDT logging tools. 7/24/2006 00:00 - 01:00 1.00 EVAL N SFAL INT1 Continue making up and test MDT logging tools. 01:00 - 01:30 0.50 EVAL P INT1 Rig up wireline sheave in derrick. 01:30 - 06:30 5.00 EVAL P INT1 Run in hole with MDT logging tools on drill pipe to 5,131' tool depth. Circulated stands down per SLB ~ 1,752', 3,376', 3,748', 4,116', 4,591', 4,974'. 167 gpm, 75-200 psi. 06:30 - 08:30 2.00 EVAL P INT1 Pick up and make up side door entry sub. Rig up lower sheave, pump down and latch up to logging tools. 210 gpm, 400 psi. 08:30 - 11:00 2.50 EVAL N SFAL INT1 Check tools. MDT pressure sampler would not function. Made software adjustment to get around problem. 11:00 - 22:30 11.50 EVAL P INT1 Run in hole taking MDT pressure samples from 5,342' to 6,586'. Total of 29 out of 34 tests good pressure samples taken. 22:30 - 00:00 1.50 EVAL P INT1 POH from 6,586 to 5,956' ~ 1,200 fph for fluid sample tests 7/25/2006 00:00 - 22:00 22.00 EVAL P INT1 Take MDT fluid samples with 5 out of 8 recovered #1 - 5,956' - OA -good #2 - 6,324' - OBc -good #3 - 6,089' - OBa -failed #4 - 6,196' - OBb -good #5 - 6,124' - OBa -good #6 - 6,586' - OBd -good #7 - 5,453' - M62 -failed #8 - 5,473' - MB2 -failed 22:00 -00:00 2.00 EVAL P INT1 PJSM. Pull wire to 200' below the surface and RD the side door entry sub. 7/26/2006 00:00 - 05:00 5.00 EVAL P INT1 POH from 5,172' standing back 4" DP and HWDP to surface, MW in - 9.1 ppg, MW out - 9.1 ppg. Breakout and LD MDT tools. 05:00 - 06:00 1.00 EVAL P INT1 MU cleanout BHA #2: 9-7/8" DS 147, stab, 4 jts of 5" HWDP, jars, 4 jts of 5" HWDP, 8 stds of 4" HWDP. 06:00 - 07:30 1.50 EVAL P INT1 RIH with cleanout BHA#2 on 4" DP from 1,022' to 3,409'. 07:30 - 09:00 1.50 EVAL P INT1 Cut and slip 71' of drilling line. Service the top drive and crown. Clean under the drawworks. 09:00 - 11:00 2.00 EVAL P INT1 RIH from 3,409' to 6,680'. Worked tight spots at 6,196' and 6,340' without pumps. 11:00 - 12:30 1.50 EVAL P INT1 Stage up the pumps to 560 gpm, 2,050 psi, 130 rpm and circulate a bottoms up. Pump a 35 bbl 10.6 ppg sweep from surface to surface at 660 gpm, 2,680 psi, 130 rpm. MW in - 9.1 ppg, MW out - 9.1 ppg. 12:30 - 15:30 3.00 EVAL P INT1 Monitor the well -stable. POH from 6,680' standing back the Printed: 9/5/2006 2:49:57 PM BP ., Page 8 of 31 Operations~Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3!2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3!2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 7/26/2006 12:30 - 15:30 3.00 EVAL P INTi 4" DP and 4" HWDP - PU - 133k, SO - 93k. 15:30 - 18:30 3.00 EVAL P INT1 LD Cleanout BHA#2 from the top of the 5" HWDP. Clear and clean the rig floor. 18:30 - 19:00 0.50 BOPSU P INT1 Pull the wear ring. Jet and drain the BOP stack. 19:00 - 21:00 2.00 BOPSU P INT1 Changeout the upper pipe rams from 3-1/2" x 6" variables to 7-5/8" rams. Test the door seals to 250 psi / 3,500 psi -good. RD testing equipment and make a dummy run with the 7-5/8" casing hanger. 21:00 - 00:00 3.00 CASE P INT1 RU to run 7-5/8" 29.7# L-80 BTC-m /TCII casing. 7/27/2006 00:00 - 04:30 4.50 CASE P INT1 PU and RIH with 7-5/8" 29.7# L-80 BTC-m shoe track and check floats -holding. Continue PU and RIH with 7-5/8" 29.7# L-80 BTC-m casing to 1,958', utilizing BOL 2000 NM thread lubricant and torqued to the mark with 10.5k ftlbs. Filled every joint with the fillup tool and broke circulation for 5 minutes every 10 joints while running in the hole. 04:30 - 05:00 0.50 CASE P INT1 RU the rig floor to run 7-5/8" TCII casing. 05:00 - 08:30 3.50 CASE P INTt Crossover and RIH with 7-5/8" 29.7# L-80 TCII to 3,441' - torque fuming each connection with 10k ftlbs and utilizing Jet Lube Seal Guard thread lubricant. Filled every joint with the fillup tool and broke circulation for 5 minutes every 10 joints while running in the hole. 08:30 - 09:00 0.50 CASE P INT1 Circulate a bottoms up at 3,441' prior to going into the open hole with the casing -300 gpm, 420 psi, PU - 135k, SO - 100k. 09:00 - 15:30 6.50 CASE P INT1 Continue PU and RIH with 7-5/8" 29.7# L-80 TCII to 6,642' - torque fuming each connection with 10k ftlbs and utilizing Jet Lube Seal Guard thread lubricant. Filled every joint with the fillup tool and broke circulation every 5 joints RIH and circulated for 10 minutes every 15 joints while running in the hole. Washed the last joint down to 6,642'. 15:30 - 16:00 0.50 CASE P INT1 MU the casing hanger and landing joint. Land the hanger on the ring with the shoe at 6,670'. LD the fillup tool and RU the cement head, PU - 225k, SO - 107k. Ran total of: 46 jts (includes 4 RA marker joints) 7 5/8" 29.7# L-80 BTC-M casing, 119 jts 7 5/8" 29.7# L-80 TCII casing 1 X-over jt 75/8" TCII box XBTC-M pin 2 ea. 10 'BTC-M pup joints 3 ea. 20 'BTC-M pup joints 81 straight 7-3/4" x 9-5/8" x 8" centralizers 40 stop rings Shoe ~ 6,670' RA tag ~ 6,381' OBb RA tag ~ 6,115' OBa RA tag ~ 6,015' OA RA tag ®5,881' 16:00 - 17:00 1.00 CEMT P INT1 Circulate and condition the mud for the cement job while staging the pumps up to 300 gpm, 530 psi. Hold PJSM with Schlumberger while circulating and begin hatching up the cement. 17:00 - 19:30 2.50 CEMT P INT1 Land the hanger tin the ring and line up to Schlumberger. Drop Printed: 9/5/2006 2:49:57 PM $P Page 9 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3!2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT 'Phase Description of Operations 7/27/2006 17:00 - 19:30 2.50 CEMT P INT1 bottom plug. Pump 5 bbls H2O. Shut down. Pressure test surface cementing lines to 3,500 psi - OK. Pump 20 bbls CW-100 followed by 50 bbls 10.5 ppg MudPush Spacer. Chase the spacer with 58 bbls 15.8 ppg "G" Durablend batched mixed lead cement ®5 bpm, 350 psi. Switch tanks and pump 58 bbls 16.3 ppg "G" Durastone batched mixed tail cement ~ 6 bpm, 300 psi. Shut down, drop top plug and kick out with 5 bbls H2O. Shut down, switch to rig pumps and pump 298 bbls of seawater ~ ICP - 7 bpm, 150 psi, FCP - 7 bpm, 1,100 psi. Slow pumps down to 3 bpm, 1,025 psi. Bump plug with calculated displacement of 298 bbls ~ 96% with 1,600 psi. Bleed pressure off. Check floats - OK. Bumped plug ~ 1920 7/27/2006. Had full returns throughout job. Stopped pipe reciprocation with 275 bbls of seawater away. 19:30 - 00:00 4.50 CASE P INT1 RD the cement head and the landing joint. Install packoff and run in the lock down screws - 450 ttlbs. Pressure test to 5,000 psi and hold for 10 minutes -good. LD the fillup tool and clear the floor of the cement head, elevators and the long bales. Changeout to the short bales and elevators. 7/28/2006 00:00 - 03:00 3.00 BOPSU P INT7 Flush the stack and install the test plug. Changeout the upper rams from 7-5/8" to 3-1/2" x 6" variables. RU testing equipment and test to 250 psi / 3,500 psi -good. RD testing equipment. Install wear ring. 03:00 - 04:00 1.00 DRILL P PROD1 Bring BHA components to the rig floor. Simops: Cement compressive strength > 500 psi. Perform LOT down the 10-3l4" x 7-5/8" OA with 9.1 ppg mud, 550 psi, 2,778' TVD - 12.9 ppg EMW. Inject 110 bbls of 9.1 ppg LSND fluid down the OA to ensure clear - 3 bpm, 850 psi. Freeze protect OA with 103 bbls dead crude. Simops: Clean pits for MOBM 04:00 - 04:30 0.50 DRILL P PROD1 PU 6 jts of 4" HT40 OP and stand back 2 stands in the derrick. Continue Simops operations 04:30 - 09:00 4.50 DRILL P PROD1 PJSM. MU BHA#6 and RIH. Continue Simops operations. BHA#6: 6-3/4" Hycalog DS146h+gjuw RR w/ 3 x 9's and 3 x 10's, 4-3/4" AIM motor 4R/5S 6 stg, bypass sub w/float, nm stab, MWD/LWD, PWD, ADN, 2 x nm flex dc's, circ sub, xo, 1 jst 4" DP, jars 09:00 - 12:00 3.00 DRILL P PROD1 RIH with BHA#6 picking up single joints of 4" HT40 DP from the pipe shed. 12:00 - 13:00 1.00 DRILL N WAIT PROD1 Shut down due to crew change and Nordic 3 in the road. 13:00 - 13:30 0.50 DRILL P PROD1 Continue RIH with BHA#6 picking up single joints of 4" HT40 DP from the pipe shed. 13:30 - 14:00 0.50 DRILL P PROD1 Shallow test the MWD tools -good, 320 gpm, 1,190 psi 14:00 - 18:00 4.00 DRILL P PROD1 Continue RIH with BHA#6 picking up single joints of 4" HT40 DP from the pipe shed. 18:00 - 18:30 0.50 DRILL P PROD1 RIH with 8 stands of 4" HWDP from the derrick. 18:30 -20:00 1.50 DRILL P PROD1 Continue RIH with BHA#6 picking up single joints of 4" HT40 DP from the pipe shed. 20:00 -20:30 0.50 DRILL P PROD1 Service and lubricate the rig and the top drive. 20:30 - 21:30 1.00 CASE P PROD1 RU and pressure test the 7-5/8" casing to 3,500 psi. Chart and Printed: 9/5/2006 2:49:57 PM ~' , gP Page'10 of 31 Operations ~iarnmary~ Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3!2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task`.' Code NPT ` Phase Description of Operations 7/2812006 20:30 - 21:30 1.00 CASE P PROD1 hold for 30 minutes -good test. RD and blowdown lines. 21:30 - 23:00 1.50 DRILL P PROD1 Wash down and tag the 7-5/8" float collar on depth at 6,586'. Drill shoe track to 6,668', 250 gpm, 1,190 psi, 40 rpm, 7 k TO, PU - 150k, SO - 85k, ROT - 115k. 23:00 - 23:45 0.75 DRILL P PROD1 Circulate the hole clean prior to swapping out to MOBM. 23:45 - 00:00 0.25 DRILL P PROD1 Clean out the pill pit and prepare for fluid swap to MOBM. 7/29/2006 00:00 -00:30 0.50 DRILL P PROD1 Continue to clean out the pill pit and prepare for fluid swap to MOBM. 00:30 - 01:30 1.00 DRILL P PROD1 Displace the well over from seawater to 9.2 ppg MOBM drilling fluid. 01:30 - 01:45 0.25 DRILL P PROD1 Drill out the 7-5/8" float shoe, rat hole and 28' of new formation to 6,708'. Circulate to get the cuttings up the hole and position the bit inside the 7-518" casing. 01:45 - 02:00 0.25 DRILL P PROD1 Perform an FIT to 11.5 ppg EMW with 9.2 ppg MOBM drilling fluid and 560 psi surface pressure at 4,632' ND. 02:00 - 03:00 1.00 DRILL P PROD1 Correlate logs from intermediate hole to production hole, take baseline ECD's and SPR's. 03:00 - 12:00 9.00 DRILL P PROD1 Drill 6-3/4" hole ahead directionally from 6,708' to 7,568', PU - 140k, SO - 75k, ROT - 108k, 306 gpm, 2,645 psi off, 2,825 psi on, 60 rpm, 5.2 k TO off, 6.5k TO on, AST - 1.88, ART - 2.42, CECD - 9.97 ppg, AECD - 10.54 ppg. Take surveys every 30'. 12:00 -00:00 12.00 DRILL P PROD1 Drill 6-3/4" hole ahead directionally from 7,568' to 8,713', PU - 145k, SO - 75k, ROT - 105k, 306 gpm, 2,790 psi off, 2,890 psi on, 60 rpm, 6 k TO off, 7k TO on, AST - 2.37, ART - 2.93, CECD - 10.01 ppg, AECD - 10.59 ppg. Take surveys every 30'. 7/30/2006 00:00 - 12:00 12.00 DRILL P PROD1 Drill 6-3/4" hole ahead directionally from 8,713' to 9,965', PU - 155k, SO - 65k, ROT - 105k, 306 gpm, 2,820 psi off, 3,115 psi on, 60 rpm, 6.8k TO off, 9.1 k TO on, CECD - 10.00 ppg, AECD - 10.54 ppg, AST - 1.88, ART - 2.77. Take surreys every 30'. 12:00 - 19:30 7.50 DRILL P PROD1 Drill 6-3/4" hole ahead directionally from 9,965' to 10,753', PU - 155k, SO - 75k, ROT - 105k, 306 gpm, 2,990 psi off, 3,100 psi on, 60 rpm, 8k TO off, 9k TO on, CECD - 10.00 ppg, AECD - 10.67 ppg. Take surveys every 30'. AECD climbed to 10.81 pPg• Pumped a 10.8 ppg sweep around at 10,339' with no increase in cuttings across the shakers. 19:30 - 20:30 1.00 DRILL P PROD1 Circulate for ECD management - 306 gpm, 2,990 psi. CECD - 10.00 ppg. AECD initial - 10.81 ppg, AECD final - 10.67 ppg. 20:30 - 00:00 3.50 DRILL P PROD1 Drill 6-3/4" hole ahead directionally from 10,753' to 10,913', PU - 155k, SO - 75k, ROT - 105k, 306 gpm, 2,990 psi off, 3,100 psi on, 60 rpm, 8k TO off, 9k TO on, CECD - 10.01 ppg, AECD - 10.76 ppg, AST - 1.52, ART - 4.67. Take surveys every 30'. 7/31/2006 00:00 - 13:00 13.00 DRILL P PROD1 Drill 6-314" hole ahead directionally from 10,913'to 11,965' (TD), PU - 155k, SO - 60k, ROT - 105k, 306 gpm, 3,050 psi off, 3,200 psi on, 60 rpm, 8k TO off, 9k TQ on, CECD - 10.32 ppg, AECD - 10.90 ppg, AST - 4.38, ART - 2.88. Take surveys every 30'. 13:00 - 14:30 1.50 DRILL P PROD1 Circulate the well - 310 gpm, 3,225 psi, CECD - 10.32 ppg, AECD - 10.87 ppg. 14:30 -00:00 9.50 DRILL P PROD1 MAD pass / Backream from 11,965' to 9,287' at <600'/hr - 313 gpm, 2,860 psi, 60 rpm, 6k TD, ROT • 110k, CECD - 10.32 Printed: 9/5/2006 2:49:57 PM . gp Page 11 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES .Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 7/31/2006 t4:30 -00:00 9.50 DRILL P PROD1 ppg, AECD - 10.4 ppg. 8/1/2006 00:00 - 10:30 10.50 DRILL P PROD1 MAD pass / Backream from 9,287' to 7,200' at <600'/hr, slow 10:30 - 11:00 0.501 DRILL P 11:00 - 13:00 2.00 DRILL P 13:00 - 14:30 I 1.501 DRILL I P 14:30 - 18:00 I 3.501 DRILL I P 18:00 - 19:30 1 1.501 DRILL I P 19:30 - 23:30 I 4.00 I DRILL I P 18/2/2006 100:00 -03:00 3.001 DRILL P 03:00 - 04:30 I 1.501 DRILL I P 04:30 - 06:00 I 1.501 CASE I P 06:00 - 12:00 ( 6.00 ~ CASE I P 12:00 - 17:00 I 5.001 CASE I P 17:00 - 17:30 I 0.501 CASE 1 P 17:00 - 22:00 5.00 CASE P 22:00 - 23:00 1.00 CASE P 23:00 -00:00 1.00 BOPSU P 8/3/2006 00:00 -04:00 4.00 BOPSU P 04:00 - 06:30 2.50 DRILL P BR rate to <100'/hr from 7,200' to 7,000' and then bring rate up to <600'/hr from 7,000 to 6,680'/hr - 313 gpm, 2,435 psi, 60 rpm, 6k TO, ROT - 106k. PROD1 Monitor the well at the shoe -stable. POH to 5,840'. PROD1 Service and lubricate the rig and top drive. Slip and cut 64' of drilling line PROD1 RIH from 5,840' to 6,517' and log the RA tags in the 7-5/8" casing for verification at <200'/hr, 313 gpm, 2,300 psi - 5,88f', 6,015', 6,115', 6,380'. PRODt RIH from 6,517' to 11,965'. Precautionary wash the last stand to bottom. PROD1 Pump 15 bbls 10.7 ppg weighted sweep and displace the well over to SFMOBM - 318 gpm, 3,330 psi, 60 rpm, 7k TO, ROT - 100k. PROD1 Monitor the well -stable. MW in - 9.2 ppg, MW out - 9.2 ppg. POH standing back 4" DP from 11,965' to 6,612' without any problems, PU - 145k, SO - 75k. PROD1 Circulate a bottoms up at the shoe -302 gpm, 2,425 psi, 60 rpm, 4k TO. PROD? Monitor the well -stable. Pump dry job. POH standing back 4" DP and 4" HWDP from 6,612' to 234'. PROD1 PJSM. LD or stand back BHA #6 components. 6-3/4" DS146h+gjuw graded: 1-3-BT-G-X-1-CT-TD. Clear and clean the floor. RUNPRD Clear and clean the floor. Change out the wear ring. RU to run 4.5" 12.6# L-80 BTC slotted and IBT solid liner. RUNPRD PJSM. PU and RIH with 4.5' slotted shoe joint and 112 jts of 4.5" 12.6# L-80 BTC slotted liner, XO, 8 jts of 4.5" 12.6# L-80 IBT solid liner and four spaceout pups. Each connection utilized BOL 2000 NM thread lubricant and was torqued to the mark with 3,800 fflbs. RUNPRD Make up swell packer assembly and Aluminum Billet on GS-spear and RIH on 4" DP and HWDP to tag bottom at 11,965'. Ran a total of 122 4.5" x 5.75" x 8" rigid centralizers. RUNPRD Spot the liner shoe at 11,963', PU - 170k, SO - 70k. Break circulation at 1.5 bpm, 85 psi and increase rate to 3 bpm, 1,850 psi. Slack off 10k while pumping to release the GS-spear. PU - 140k, liner is released from aluminum billet -top at 7,018'. RUNPRD POH standing back 4" DP and 4" HWDP to 6,667. Monitor the well -stable. Pump a dry job and POH. Break out and LD the GS spear. Clear and clean the floor. RUNPRD Service and lubricate the top drive and the rig components. Changeout the quill. RUNPRD Pull the wear ring and flush the BOP stack. RUNPRD RU testing equipment and test BOPS, Annular and valves to 250/3,500 psi - no failures. RD testing equipment and blowdown all surface lines. Witness of the test was waived by Ch~k Schieve of the AOGCC. WiMess of the test was performed by James Franks - BP and Roy Hunt - NAD. PROD2 PJSM. MU BHA#7 and RIH. Pfintbtl: 8/52(J(ItiL:4:1:0/ rm BF page 12 of 31 Operations Summary :Report:. Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task` Code NPT Phase Description of Operations 8/3/2006 04:00 - 06:30 2.50 DRILL P PROD2 BHA#7: 6-3/4" Hycalog DS146h+gjuw w/ 3 x 9's and 3 x 10's, 4-3l4" AIM motor 4R/5S 6 stg, bypass sub w/float, nm stab, MWD/LWD, PWD, ADN, 2 x nm flex dc's, circ sub, xo, 1 jst 4" DP, jars 06:30 - 07:00 0.50 DRILL P PROD2 RIH with BHA#7 on 4" DP to 1,190'. 07:00 - 07:30 0.50 DRILL P PROD2 Shallow test the MWD/LWD, 275 gpm, 1,475 psi -good. 07:30 - 09:30 2.00 DRILL P PROD2 Continue RIH with 4" DP and 4" HWDP to 6,800' filling pipe every 2,500'. 09:30 - 11:00 1.50 DRILL P PROD2 Log down to tie in depths and tag up on the aluminum billet on depth at 7,018' - 2502 gpm, 2,050 psi, PU - 140k, SO - 85k. 11:00 - 12:00 1.00 DRILL P PROD2 POH to 6,995' and displace the well over from 9.2 ppg SFMOBM to 9.2 ppg MOBM - 252 gpm, 2,052 psi, PU - 140k, SO - 85k, ROT - 105k, 45 rpm, 6k TO. 12:00 - 14:30 2.50 DRILL P PROD2 Orient and trench. KO aluminum billet ~ 7,018' and time drill to 7,024' - 306 gpm, 2,645 psi. Work pipe across the billet without problems. 14:30 -00:00 9.50 DRILL P PROD2 Drill OBd L1 6-3/4" hole ahead directionally from 7,024' to 8,046', PU - 145k, SO - 85k, ROT - 105k, 306 gpm, 2,900 psi off, 3,000 psi on, 60 rpm, 5k TO off, 6k TO on, AST - 2.55, ART - 2.55, CECD - 10.18 ppg, AECD - 10.81 ppg. Take surveys every 30'. 8/4/2006 00:00 - 12:00 12.00 DRILL P PROD2 Drill OBd L1 6-3/4" hole ahead directionally from 8,046' to 9,478', PU - 155k, SO - 75k, ROT - 109k, 306 gpm, 2,960 psi off, 3,100 psi on, 60 rpm, 7k TO off, 8k TO on, CECD - 10.18 ppg, AECD - 10.76 ppg, AST - 2.83, ART - 4.06. Take surveys every 30'. 12:00 - 16:30 4.50 DRILL P PROD2 Drill OBd L1 6-3/4" hole ahead directionally from 9,478' to 10,052', PU - 163k, SO - 68k, ROT - 103k, 306 gpm, 3,100 psi off, 3,400 psi on, 60 rpm, 7k TO off, 8k TO on, CECD - 10.25 ppg, AECD - 11.05 ppg. Take surveys every 30'. 16:30 - 17:00 0.50 DRILL P PROD2 Circulate and ~ndition the mud to reduce ECD's. Pump a hi-visc sweep surface to surface with -10°~ addRional cuttings coming across the shakers -306 gpm, 3,100 psi. AECD initial - 11.05 ppg, AECD final - 10.79 ppg, CECD - 10.25 ppg 17:00 - 00:00 7.00 DRILL P PROD2 Drill OBd L1 6-3/4" hole ahead directionally from 10,052' to 10,626', PU - 166k, SO - 65k, ROT - 104k, 306 gpm, 3,045 psi off, 3,300 psi on, 60 rpm, 7k TO off, 8k TO on, CECD - 10.28 ppg, AECD -11.04 ppg, AST - 1.83, ART - 2.68. Take surveys every 30'. 8/5/2006 00:00 - 04:30 4.50 DRILL P PROD2 Drill OBd L1 6-3/4" hole ahead directionally from 10,626 to 11,200', PU - 166k, SO - 65k, ROT - 104k, 306 gpm, 3,100 psi off, 3,400 psi on, 60 rpm, 7k TO off, 8k TQ on, CECD - 10.32 ppg, AECD -11.04 ppg. Take surveys every 30'. CECD recalculated with recent mud properties - 10.14 ppg 04:30 -06:00 1.50 DRILL P PROD2 Circulate to reduce ECD's -306 gpm, 3,100 psi, 60 rpm, 7k TO. AECD initial - 11.04 ppg, AECD final - 10.8 ppg, CECD - 10.16ppg 06:00 - 12:00 6.00 DRILL P PROD2 Drill OBd L1 6-3/4" hole ahead directionally from 11,200' to 11,626', PU - 165k, SO - 70k, ROT - 103k, 306 gpm, 3,200 psi off, 3,400 psi on, 60 rpm, 7k TQ off, 8k TQ on, AST - 2.2, ART - 3.05, CECD - 10.41, AECD - 11.21. Take surveys every 30'. Pumped a weighted sweep around while drilling ahead 11,322', -10°~ addkional returns to surface. Printed: 9/5/2006 2:49:57 PM BP Page 13 of 31 Operations Summary; Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABORS 9ES Rig Number: Date From -'fo Hours Task Code Nf'T Phase Description of Operations 8!5/2006 12:00 - 13:30 1.50 DRILL P PROD2 Drill OBd L1 6-3/4" hole ahead directionally from 11,626' to 11965' (TD), PU - 155k, SO - 56k, ROT - 99k, 306 gpm, 3,200 psi off, 3,400 psi on, 60 rpm, 7k TO off, 8k TO on, AST - 0.32, ART - 1.06, CECD - 10.44, AECD - 11.21. Take surveys every 30'. 13:30 - 14:30 1.00 DRILL P PROD2 Circulate bottoms up -306 gpm, 3,200 psi, CECD - 10.44 ppg, AECD - 10.98 ppg, MW in - 9.2 ppg, MW out - 9.2 ppg. 14:30 - 15:00 0.50 DRILL P PROD2 Montor the well -stable. MAD pass out of the hole from 11,965' to 11,869' at <600'/hr, 306 gpm, 3,200 psi, 60 rpm, 7k TO. 15:00 - 20:30 5.50 DRILL N RREP PROD2 The back up wrench on the top drive came in contact with the rotary table, causing damage to the pipe handling equipment and requiring change out. Change out the back up wrench on the top drive. 20:30 - 00:00 3.50 DRILL P PROD2 Resume MAD pass logging of the hole from 11,869' to 11,009' at <600'/hr, 306 gpm, 3,200 psi, 60 rpm, 7k TO. 8!6/2006 00:00 - 16:30 16.50 DRILL P PROD2 Continue MAD pass logging of the hole from 11,009' to 7,110' at <600'/hr, 306 gpm, 2,500 psi, 60 rpm, 7k TO. MAD pass rate was reduced to <200'/hr from 9,992' to 9,842', 9,547' to 9,397' and 7,222' to 7,110' (bit depth) for caliper log and future swell packer placement. 16:30 - 17:00 0.50 DRILL P PROD2 Orient 140R and POH from 7,110' and inside the 7-5/8" casing shoe to 6,612', PU - 140k, SO - 96k. 17:00 - 18:30 1.50 DRILL P PROD2 Service the top drive, blocks and crown. Inspect the draw works and the brakes. Slip and cut 100' of drilling line. 18:30 - 19:30 1.00 DRILL P PROD2 Drop the ball and open the circ sub. Circulate a bottoms up - 416 gpm, 2,100 psi. MW in - 9.2 ppg, MW out - 9.2 ppg. 19:30 - 23:00 3.50 DRILL P PROD2 Monitor the well -stable. Pump dry job and POH standing back the 4" DP and 4" HWDP to the top of the jars 23:00 -00:00 1.00 DRILL P PROD2 PJSM for LD BHA#7 and handling nuclear source. LD the jars and circ sub. Stand back the flex collars. Remove the nuclear source. 8/7/2006 00:00 -00:30 0.50 DRILL P PROD2 Continue to LD BHA#7. LD the ADN, PWD, MWD/LWD, nm stab, bypass sub, motor and bit. 6-3/4" DS146h+gjuw graded: 0-1-WT-S-X-I-NO-TD 00:30 - 01:00 0.50 DRILL P PROD2 Clear and clean the rig floor. 01:00 - 02:00 1.00 CASE P RUNPRD RU to run 4.5" 12.6# L-80 BTC slotted /IBT solid OBd L-1 liner. 02:00 -13:00 11.00 CASE P RUNPRD PJSM. PU 4.5" 12.6# L-80 BTC slotted /IBT solid OBd L-1 liner per running detail to 5,736'. Ran 112 joints of 4.5" 12.6# L-80 BTC slotted liner, 21 joints of 4.5" 12.6# L-80 IBT solid liner, 3 swell packer assemblies, 7-5/8 x 5-1/2" HMC hanger, 7-5/8" x 5-1/2" HRD ZXP liner top packer w/10.74' tieback, 19.07' Seal Bore Extension. All connections torqued to the mark with 3,800 ftlbs using BOL2000NM thread lubricant. 13:00 - 17:00 4.00 CASE P UNPRD Crossover and RIH with 4.5" {finer on 4" DP and 4" HWDP and tag bottom at 11,965', PU - 196k, SO - 77k. Break circulation, drop ball and pump on seat. Pressure up to 2,000 psi to set the hanger and then pressure up to 3,400 psi and release from the hanger. Bleed off peessure. PU and then SO with 40k to set the ZXP liner top packer. Repeat several times with rotation. Test the liner top packer to 2,000 psi prior to unstinging from RS packoff -good. PU out of the liner. Printed: 9/52006 2:49:57 PM BP Page 14 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/7/2006 13:00 - 17:00 4.00 CASE P RUNPRD Float Shce ~ 11,965' Slotted Liner ~ 9,874' to 11,923' Swell Packer ~ 9,850' to 9,860' Swell Packer ~ 9,431' to 9,441' Slotted Liner ~ 7,233' to 9,411' Swell Packer ~ 7,123' to 7,133' Slotted Liner ~ 6,687' to 7,102' Seal bore extension ~ 6,256' to 6,275' 7.625" x 5.5" HMC liner hanger ~ 6,250' 7.625" x 5.5" HRD ZXP liner top packer w/10.74' tieback 6,229' 17:00 - 18:00 1.00 CASE P RUNPRD Circulate a bottoms up at 412 gpm, 2,115 psi. MW in - 9.2 ppg, MW out - 9.2 ppg. 18:00 - 21:00 3.00 CASE P RUNPRD POH standing back the 4" DP and 4" HWDP. Break out and LD the liner running tools. Clear and clean the rig floor. 21:00 - 22:30 1.50 STWHIP P WEXIT Bring the milling tools to the rig floor. PJSM. PU and stand back 9 x 4-3/4" drill collars. 22:30 - 00:00 1.50 STWHIP P WEXIT PJSM. MU OBb L-2 Whipstock BHA. 8/8/2006 00:00 - 02:30 2.50 STWHIP P WEXIT Continue to MU OBb L-2 Whipstock BHA. to 1,174' -dummy seals w/ nogo shoulder, unloader jar, xo, 15' 4" HT40 pup, xo, pin x pin xo, anchor, safety disconnect, unloader jar, boot basket, ported bit sub, whipstock, window mill, lower mill, flex joint, upper mill, 1 jt 3-1/2" HWDP, float sub, MWD, bumper sub, 9 x 4-3/4" DC's, xo, 24 x 4" HWDP. Shallow test the MWD -good. 02:30 - 08:30 6.00 STWHIP P WEXIT RIH with OBb L-2 Whipstock on 4" DP from 1,174' to 6,052', PU - 190k, SO - 145k 08:30 - 09:00 0.50 STWHIP P WEXIT Orient 20 degrees LHS. RIH and tag the top of the L-1 liner at 6,229'. Set down 20k to set the anchor. Continue to SO to shear the pin. Top of the slide at 6,169', bottom of the slide at 6,182'. 09:00 - 09:30 0.50 STWHIP P WEXIT Displace the well over to reconditioned 9.2 ppg MOBM -305 gpm, 2,050 psi. 09:30 - 16:00 6.50 STWHIP P WEXIT Mill window from 6,169' to 6,182' and under gauged open hole to 6,200', PU - 145k, SO - 88k, ROT - 104k, 60 rpm, 5.3k TO, 300 gpm, 2,000 psi. 16:00 - 16:30 0.50 STWHIP P WEXIT Pump 50 bbl sweep and circulate the hole at 300 gpm, 2,000 psi while working the mills across the window several times. MW in - 9.2 ppg, MW out - 9.2 ppg. 16:30 - 19:30 3.00 STWHIP P WEXIT Monitor the well -stable. Pump dry job and POH from 6,200'. 19:30 - 20:30 1.00 STWHIP P WEXIT . Stand back the 4-3/4" collars and LD the MWD and mills - in gauge. 20:30 - 21:00 0.50 STWHIP P WEXIT Flush the BOP stack. 21:00 -22:30 1.50 DRILL P PROD3 PJSM. MU BHA#9 and RIH. BHA#9: 6-3/4" Hycalog DS146h+gjuw RR w/ 3 x 9's and 3 x 10's, 4-3/4" AIM motor 4R/5S 6 stg, bypass sub w/float, nm stab, MWD/LWD, PWD, ADN, 2 x nm flex dc's, circ sub, xo, 1 jst 4" DP, jars 22:30 - 23:00 0.50 DRILL P PROD3 RIH with BHA#9 on 4" DP to 1,095'. 23:00 - 23:30 0.50 DRILL P PROD3 Shallow test the MWD -good. 23:30 -00:00 0.50 DRILL P PROD3 RIH with BHA#9 on 4" DP to 2,147'. Printed: 9/52006 2:49:57 PM g p Page 15 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date:. From.- To Hours Task Code NPT Phase Description of Operations 8/9/2006 00:00 - 02:00 2.00 DRILL P PROD3 Continue RIH with 6-3/4" BHA#9 on 4" DP to 6,100'. 02:00 - 03:30 1.50 DRILL P PROD3 Slip and cut drilling line. Service the top drive, draw works and crown. 03:30 - 04:00 0.50 DRILL P PROD3 Take baseline ECD readings and Orient BHA 20 LHS. 04:00 - 12:00 8.00 DRILL P PROD3 RIH from 6,100' and past the window (6,169' -6,182') to 6,200'. Drill 6-3/4" OBb L-2 hole ahead directionally from 6,200' to 6,900', PU - 125k, SO - 85k, ROT - 96k, 2,350 psi on, 2,250 psi off, TO on - 6.5k, TO off - 5.5k, 280 gpm, 60 rpm, AST - 2.53, ART - 0.89. CECD - 10.15 ppg, AECD - 10.59 ppg 12:00 - 18:30 6.50 DRILL P PROD3 Dril16-3/4" OBb L-2 hole ahead directionally from 6,900' to 8,130', PU - 146k, SO - 76k, ROT - 104k, 2,965 psi on, 2,645 psi off, TO on - 8.6k, TO off - 7.6k, 290 gpm, 60 rpm, CECD - 10.07 ppg, AECD - 11.01 ppg. Pumped a 30 bbl, 11.2 ppg sweep at 7,575' while drilling ahead with -25% additional cuttings coming across the shakers. 18:30 - 19:00 0.50 DRILL P PROD3 Circulate to reduce ECD's from 11.01 ppg to 10.85 ppg 19:00 - 00:00 5.00 DRILL P PROD3 Drill 6-3I4" OBb L-2 hole ahead directionally from 8,130' to 8,523', PU - 146k, SO - 76k, ROT - 104k, 2,965 psi on, 2,645 psi off, TO on - 8.6k, TO off - 7.6k, 290 gpm, 60 rpm, AST - 2.2, ART - 4.34. CECD - 10.14 ppg, AECD - 10.9 ppg. Reduced the ROP to control ECD's. 8/10/2006 00:00 - 12:00 12.00 DRILL P PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 8,523' to 9,735', PU - 150k, SO - 80k, ROT - 101 k, 2,850 psi on, 2,570 psi off, TO on - 8.6k, TO off - 7.6k, 285 gpm, 60 rpm, CECD - 10.25 ppg, AECD - 11.07 ppg, AST - 2.45, ART - 3.95. 12:00 - 00:00 12.00 DRILL P PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 9,735' to 11,201', PU - 152k, SO - 64k, ROT - 99k, 3,020 psi on, 2,740 psi off, TQ on - 9.1 k, TO off - 7.8k, 290 gpm, 60 rpm, CECD - 10.34 ppg, AECD - 10.89 ppg, AST - 2.25, ART - 4.06. 8/11/2006 00:00 - 02:30 2.50 DRILL P PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 11,201' to 11,456', PU - 152k, SO - 64k, ROT - 99k, 3,020 psi on, 2,740 psi off, TO on - 9.1 k, TO off - 7.8k, 290 gpm, 60 rpm, CECD - 10.34 ppg, AECD - 11.24 ppg. 02:30 - 03:15 0.75 DRILL P PROD3 Circulate bottoms up to reduce ECD's from 11.24 ppg to 10.84 PPg, 285 gpm, 2,900 psi, 60 rpm. 9.Ok TO. 03:15 - 07:00 3.75 DRILL P PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 11,456' to 11,910' (TD), PU - 154k, SO - 64k, ROT - 99k, 3,110 psi on, 2,760 psi off, TO on - 9.2k, TO off - 8k, 290 gpm, 60 rpm, CECD - 10.32 ppg, AECD - 11.00 ppg, AST - 0.8 ART - 1.97. 07:00 - 12:00 5.00 DRILL P PROD3 Circulate to get the cuttings away from the BHA and then MAD Pass /Backream at <600'/hr from 11,910' to 10,627', 280 gpm, 2,760 psi, 60 rpm, 7.8k TQ. 12:00 -00:00 12.00 DRILL P PROD3 Continue to MAD Pass /Backream at <600'/hr from 10,627' to 7,473', 280 gpm, 2,645 psi, 60 rpm, 7.8k TQ. 8/12/2006 00:00 - 03:15 3.25 DRILL P PROD3 Continue to MAD Pass /Backream at <600'/hr from 7,473' to 6,290', 280 gpm, 2,645 psi, 60 rpm, 7.8k TQ. Pump out of the hole without rotation from 6,290' to 6,250'. Orient the tool face to 15 LHS and POH through the window to 6,135'. 03:15 - 04:15 1.00 DRILL P PROD3 Service the top drive, draw works and the crown. 04:15 - 07:30 3.25 DRILL P PROD3 RIH from 6,130'. Wash the last stand down to 11,910'. 07:30 - 08:30 1.00 DRILL P PROD3 Circulate a bottoms up - 290 gpm, 2,940 psi, CECD - 10.34 ppg, AECD -10.48 ppg. 08:30 -09:30 1.00 DRILL P PROD3 Displace the well over from 9.2 ppg MOBM to 9.2 ppf SF Printed: 9/5/2006 2:49:57 PM .. BP Page 16 of 31 Operations Slummary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7h 6/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code 'NPT Phase Description of Operations 8/12/2006 08:30 - 09:30 1.00 DRILL P PROD3 MOBM - 290 gpm, 3,000 psi, 60 rpm, 9k TO. 09:30 - 14:00 4.50 DRILL P PROD3 MW in - 9.2 ppg, MW out - 9.2 ppg. Monitor the well -stable. POH standing back 4" DP from 11,910' to 6,135' without problems. 14:00 - 15:00 1.00 DRILL P PROD3 PJSM. Slip and cut drilling line. Clean underneath the draw works. 15:00 - 19:00 4.00 DRILL P PROD3 POH standing back 4" DP and 4" HWDP from 6,135' to the top of the jars on BHA#9 at 234'. 19:00 - 21:30 2.50 DRILL P PROD3 PJSM. LD jars. Stand back flex collars. Remove nuclear source and LD ADN. LD PWD, MWD, nm stab, bypass sub w/float, AIM motor and bit. Clear and clean the floor. 6-3/4" Hycalog DS 146h+gjuw graded: 0-1-WT-S-X-1-NO-TD. Note: Some damage was observed on the AIM tool. 21:30 -00:00 2.50 WHIP P RUNPRD PJSM. MU Whipstock Retrieval BHA to 1,506' -retrieving toot., 1 jt 3.5" HWDP, bumper sub, jars, float sub, MWD, xo, 7 stand of 4" HT40 DP and 8 stands of 4" HWDP. 8/13/2006 00:00 - 02:30 2.50 WHIP P RUNPRD RIH with Whipstock Retrieval BHA on 4" DP to 6,095'. 02:30 - 03:00 0.50 WHIP P RUNPRD Orient the hook to 160 RHS and engage the slot on the whipstock face at 6,174'. Pull 50k over, fire jars and release the anchor. POH to 6,091'. Lost 8 bbls of 9.2 ppg SF MOBM once the anchor released. 03:00 - 03:30 0.50 WHIP P RUNPRD Circulate a bottoms up - 290 gpm, 1,700 psi. MW in - 9.2 ppg, MW out - 9.2 ppg. Lost 6 bbis of SF MOBM. 03:30 - 07:00 3.50 WHIP P RUNPRD Monitor the well -stable. POH with whipstock from 6,091'. Lost 18 additional bbls of 9.2 ppg SF MOBM to the hole on the trip out. 07:00 - 10:00 3.00 WHIP P RUNPRD PJSM. LD Retrieval BHA, Whipstock and all components below the whipstock. Clear and clean the floor. 10:00 - 11:30 1.50 CASE P RUNPRD RU to run 4.5" slotted finer. 11:30 - 19:30 8.00 CASE P RUNPRD PU 4.5" 12.6# L-80 solid BTC box x IBT p XO bent joint with float shoe and RIH. PU 138 joints of 4.5" 12.6# L-80 BTC slotted liner, xo, swell packer assy, 1 joint 4.5" 12.6# L-80 IBT solid, xo, hook hanger assy and running tool to 5,731'. Each connection torqued to the mark with 3,800 ft Ibs utilizing BOL2000NM thread lubricant. 19:30 -00:00 4.50 CASE P RUNPRD RIH with 4.5" liner on a stand of DP. Screw in with the top drive aril circulate to verify nothing is plugged. RIH with 4" DP and 4" DP to the window and get up and down weights, PU - 100k, SO - 75k. Exit the window on the first attempt and RIH with 4" DP and 4" HWDP to 11,824'. 8/14/2006 00:00 -00:30 0.50 CASE P RUNPRD PU - 170k, SO - 65k. RIH from 11,824' and run past the bottom of the window -did not latch. PU and rotate the pipe. RIH past the top of the window -did not latch. Repeat. Landed the hook hanger on the 6th attempt. PU and rotate 1/2 turn. Run past the window. Rotate 1/2 turn and re-engage the window with the hookwall hanger. Float shoe, PBTMD - 11890' Swell packer - 6,256' to 6,266' Top of the Hook Hanger - 6165' 00:30 - 01:00 0.50 CASE P RUNPRD Drop ball and pump on seat. Increase pressure to 3,000 psi to release the running tool. PU to verify release, PU - 140k. Printetl: 9/5/2006 2:49:57 PM BP Page 17 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date from - To Hours Task Code NPT .`Phase Description of Operations 8/14/2006 01:00 - 02:30 1.50 CASE P RUNPRD Increase pressure to 4,300 psi and shear the ball seat. Circulate a bottoms up prior to POH. MW in - 9.2 ppg, MW out - 9.2 PPg• 02:30 - 05:30 3.00 CASE P RUNPRD Monitor the well -stable. Pump SF dry job and POH from 6,159' standing back 4" DP and HWDP. 05:30 - 06:30 1.00 CASE P RUNPRD Breakout and LD the Baker running tools. Clear and clean the floor. Bring LEM tools to the floor. 06:30 - 07:00 0.50 TIEBAC P OTHCMP Service the top drive. 07:00 - 07:30 0.50 TIEBAC P OTHCMP RU the rig floor to run the 4.5" LEM tieback assy. 07:30 - 12:00 4.50 TIEBAC P OTHCMP PJSM. PU Non Locating Seal Assy, 1 ea. 4.5" 12.6# L-80 XO joint, 2 x 15.09' 4.5" 12.6# L-80 IBT pup jts, LEM Hanger, 1 ea 4.5" 12.6# L-80 IBT-M pup jt, Casing Swivel, 5-1/2" HYD 563 x 4-1/2" IBT XO Bushing, Baker 190-47 Seal Bore Extension, Baker HRD ZXP Liner Top Packer and RIH with 2/3/8" inner work string. 12:00 - 16:00 4.00 TIEBAC P OTHCMP RIH with LEM#1 on 4" DP and 4" HWDP to 6,130 16:00 - 16:30 0.50 TIEBAC P OTHCMP Wash down from 6,130' and enter the Seal Bore Extension of L-1 at 6,256' - 2 bpm, 386 psi. Tag up on depth and set down 30k to ensure locked. PU 15k overpull and ensure locked. Set back down 30k. Seals ~ 6264' Top of LEM ~ 6,108' 16:30 - 17:00 0.50 TIEBAC P OTHCMP Drop 1.75" ball and pump on seat - 3 bpm, 600 psi. Once seated, increased pressure to 3,000 psi to set the packer. Set down 70k and increase pressure to 4,200 psi to release from the LEM. Bleed off pressure and PU with 125k. Close the annular and test the backside to 1,500 psi -good. 17:00 - 18:00 1.00 TIEBAC P OTHCMP Stand back 3 stands of 4" DP to clear the inner string from the LEM. Circulate a bottoms up, MW in - 9.2 ppg, MW out - 9.2 ppg. Monitor the well -stable. Pump SF dry job. 18:00 - 22:30 4.50 TIEBAC P OTHCMP POH to the top of the running tools standing back the 4" DP and 4" HWDP. 22:30 -00:00 1.50 TIEBAC P OTHCMP Break out and LD the running tool and the inner string components. 8/15/2006 00:00 -00:30 0.50 TIEBAC P OTHCMP Clear and clean rig floor. Lay down LEM tools off rig floor. 00:30 - 01:00 0.50 STWHIP P WEXIT Pick up whipstock assembly to rig floor 01:00 - 04:30 3.50 STWHIP P WEXIT Make up dummy seal assembly, NO GO, unloader, double pin sub, anchor, safety disconnect unloader, debris sub, bit sub, ported sub whipstock, window mill, lower string mill, flex joint, upper mill, 1 joint HWDP, float sub, MWD, and bumper sub. 04:30 - 06:00 1.50 STWHIP P WEXIT Pick up 3 stands of 43/4" drill collars, cross-over, and 7 stands 4" drill pipe to 1,087' 06:00 -09:00 3.00 STWHIP P WEXIT Shallow hole test MWD - OK. Pick up 8 stands HWDP and continue running in hole from 1,087' to 6.032'. 09:00 - 09:30 0.50 STWHIP P EXIT Orient whipstock 7 deg left of high side. PU - 130k, SO - 85k. Tag up on L2 Tie Back ~ 6,108. Anchor set with 13k down weight. Pick up to 140k to verify anchor set. Shear mills with 23k down weight. Pick up to open jars. Whipstock set for top of window ~ 6.064', bottom of window ®6,076'. 09:30 - 18:00 8.50 STWHIP P WEXIT Start displacement from 9.2 ppg SFMOBM to 9.2 ppg MOBM. Obtain slow pump rates and mill OBa window from 6,064' to 6,076'. Continue milling with window mill to 6,097' placing full Printed: 9/52006 2:49:57 PM gp Page 18 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of'Operations 8/15/2006 09:30 - 18:00 8.50 STWHIP P WEXIT gauge upper mill ~ 6,081'. 290 gpm, 1,940 psi, 85-100 rpm, 5.5k TO. PU - 135k, SO - 95k, RT - 113k, W OB - 5-10k. 18:00 - 18:30 0.50 STWHIP P WEXIT Pump 50 bbl super sweep while reciprocating and rotating pipe through window without extra drag or torque. PU - 135km SO - 95k. Metal cuttings increased appx. 5% with sweep back to surface. Shut down pumps and rotary and work pipe through window without any up or down drag. Monitor well - OK. 9.2 PP9 MW 18:30 - 21:30 3.00 STWHIP P WEXIT POH from 6,064 to 418'. 21:30 - 23:00 1.50 STWHIP P WEXIT Stand back drill collars and laydown milling assembly. String mill in gauge ~ 63/4". 23:00 - 00:00 1.00 STWHIP P WEXIT Clear and clean rig floor. Lay down milling assembly tools off rig floor. 8/16/2006 00:00 - 01:00 1.00 BOPSU P PROD4 Pull wear bushing. Make up BOP stack jetting tool and jet stack. Check kill and choke valves. Function pipe rams and annular preventer. Jet flowline, rig down tools. 01:00 - 03:30 2.50 BOPSU P PROD4 Change out air actuated IBOP on topdrive. 03:30 - 04:30 1.00 BOPSU P PROD4 Rig up to test BOPE. 04:30 - 08:00 3.50 BOPSU P PROD4 Test BOPE to 250 psi low, 3,500 psi high for 5 minutes each with 4" test joint Perform accumulator test. Witnessing of test waived by AOGCC rep John Crisp. Test witnessed by BP WSL's Robert French, Alan Madsen, NAD TP Kelly Cozby. 08:00 - 08:30 0.50 BOPSU P PROD4 Rig down 4" test equipment. Rig up 4 1/2" test equipment. 08:30 - 09:00 0.50 BOPSU P PROD4 Test upper and lower variable bore rams to 250 psi low, 3,500 psi high for 5 minutes each with 4 1/2" test joint. 09:00 - 09:30 0.50 BOPSU P PROD4 Rig down BOPE test equipment. Install wear bushing. Blow down surface lines. 09:30 - 10:00 0.50 DRILL P PROD4 Pick up BHA tools to rig floor. 10:00 - 12:30 2.50 DRILL P PROD4 PJSM. Pick up and make up 63/4" BHA #12, RR Hycalog DS 146 bit, 1.5 bent motor with AIM. Orient and install nuclear SOUfCe. 12:30 - 16:00 3.50 DRILL P PROD4 Run in hole from 235' to 5,945'. Shallow hole tested MWD ~ 1,000' - OK. Filled pipe ~ 4,056' and 5,945'. 16:00 - 17:00 1.00 DRILL P PROD4 PJSM. Cut and slip drilling line 65'. Install topdrive blower hose. 17:00 - 17:30 0.50 DRILL P PROD4 PJSM. Service topdrive and crown. 17:30 - 18:00 0.50 DRILL P PROD4 Orient high side. Obtain slow pump rates and benchmark ECD's - 10.4 ppg. Slide through window and tag bottom without problem. PU - 120k, SO - 80k, 285 gpm, 2,150 psi. 18:00 - 00:00 6.00 DRILL P PROD4 Directionally drill OBa L3 lateral from 6,097' to 6,446'. 100% sliding - 2.44 hrs. 285 gpm, 2,150 psi off, 2,300 psi on, PU - 125k, SO - 85k, RT - 100k WOB - 5-10k. CECD - 10.49 ppg, AECD - 10.03 ppg. 8/17!2006 00:00 - 12:00 12.00 DRILL P PROD4 Directionally drill OBa L3 lateral from 6,446' to 8,046'. 285 gpm, 2,630 psi off, 2,880 psi on, 60 rpm, 7k TO off, 7.4k TO on. PU - 142k, SO - 75k, RT - 104k, WOB • 10k. CECD - 10.33 ppg, AECD - 10.85 ppg. AST - 4.16 hrs, ART - 1.58 hrs. Survey every 30', backream each stand 60' prior to connections. Pumped 2 Ib over, 35 bbl, weighted sweep fe3 7,600' which returned appx 10°~ increase in cuttings to surface. 12:00 -00:00 12.00 DRILL P PROD4 Directionally drill OBa L3 lateral from 8,046' to 9,766'. 285 gpm, 2,730 psi off, 2,970 psi on, 60 rpm, 9k TO off, 9.4k TQ on. PU - 152k, SO - 73k, RT - 102k, WOB - 5-10k. CECD - Printed: 9/5/2006 2:49:57 PM gp `Page 19 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date .From ='To Hours Task Code. NPT Phase Description of Operations 8/17/2006 12:00 -00:00 12.00 DRILL P PROD4 10.51 ppg, AECD - 11.31 ppg. AST - 1.85 hrs, ART - 3.19 hrs. Survey every 30', backream each stand 60' prior to connections. Pumped 2 Ib over, 35 bbl, weighted sweep ~ 9,395' which returned no increase in cuttings to surface. 8/18/2006 00:00 - 12:00 12.00 DRILL P PROD4 Directionally drill OBa L3 lateral from 9,766' to 11,296'. 285 gpm, 3,055 psi off, 3,100 psi on, 60 rpm, 9.6k TO off, 10.1k TO on. PU - 165k, SO - 60k, RT - 99k, WOB - 5-10k. CECD - 10.61 ppg, AECD - 11.27 ppg, ART - 2.76 hrs, AST - 2.21 hrs. Survey every 30', backream each stand 60' prior to connections. 12:00 - 16:00 4.00 DRILL P PROD4 Directionally drill OBa L3 lateral from 9,766' to TD ~ 11,296' MD, 4,623' TVD. 285 gpm, 3,070 psi off, 3,210 psi on, 60 rpm, 9.1 k TO off, 9.4k TO on. PU - 175k, SO - 50k, RT - 102k, WOB - 10k. CECD - 10.67 ppg, RECD - 11.67 ppg, ART - 1.22 hrs, AST - .55 hrs. Survey every 30', backream each stand 60' prior to connections. Pumped 30 bbl 2 Ib over sweep ~ 11,785'. 16:00 - 17:00 1.00 DRILL P PROD4 Finish clearing sweep from annulus with 5% increase in cuttings back to surface. 285 gpm, 3,080 psi, 60 rpm, 9.1 k TO. Circulated until AECD's were less than .8 ppg. Monitor well - OK. MW - 9.2 PPg• 17:00 - 00:00 7.00 DRILL P PROD4 MadPass log from 11,985' to 10,110' ~ 600 fph. Mad Pass log from 10,110' to 10,053' ~ 200 fph. 285 gpm, 3,067 psi, 60 rpm, 9.5k TO, CECD - 10.67 ppg, AECD - 11.42 ppg. 8/19/2006 00:00 - 13:00 13.00 DRILL P PROD4 MadPass log from 10,053' to 9,870' ~ 200 fph. MadPass log from 9,870' to 6,610' ~ 600 fph. MadPass log from 6,610' to 6,490' ~ 200 fph. MadPass log from 6,490' to 6,290' ~ 600 fph. MadPass log from 6,290 to 6,185 ~ 200 fph. Orient high side and pull into 75/8" casing to 5,922'. 285 gpm, 2,680 psi, 60 rpm, 7.4k TO, CECD - 10.49 ppg, AECD -10.56 ppg. PU - 130k, SO - 85k. 13:00 - 13:30 0.50 DRILL P PROD4 Service topdmre and crown. 13:30 - 16:30 3.00 DRILL P PROD4 Run in hole from 5,972' to 11,870' without problem. Precautionary wash from 11,870' to 11,925' 16:30 - 18:00 1.50 DRILL P PROD4 Circulate bottoms up. 290 gpm, 2,990 psi, 60 rpm, 7.3k TO. CECD - 10.67 ppg, AECD -10.47 ppg. Prepare mud pits for SFMOBM. 18:00 - 19:30 1.50 DRILL P PROD4 Displace hole from 9.2 ppg MOBM to 9.2 ppg, 77 vis SFMOBM. 290 gpm, 3,010 psi, 60 rpm, 10k TQ, 106k RWT. CECD - 10.67 ppg, AECD - 10.67 ppg. Monitor well - OK. 19:30 -00:00 4.50 DRILL P PROD4 Pump dry job and POH from 11,925' to 5,590' without problem. PU - 175k, SO - 77k. Pumped second dry job ~ 5,972'. 8/20/2006 00:00 - 02:00 2.00 DRILL P PROD4 Continue POH with drilling assembly (BHA #12) from 5,590' to 234'. 02:00 - 03:30 1.50 DRILL P PROD4 PJSM. LD jars. Stand back flex collars. Remove nuclear source and LD ADN. LD PWD, MWD, nm stab, bypass sub w/float, AIM motor and bit. 6-3/4" Hycalog DS 146h+gjuw graded: 0-1-WT-S-X-I-NO-TD. 03:30 - 04:00 0.50 DRILL P PROD4 Clear and clean rig floor. 04:00 - 04:30 0.50 WHIP P RUNPRD PJSM. MU Whipstock Retrieval BHA to 1,506' -retrieving tool, 1 jt 3.5" HWDP, bumper sub, jars, float sub, MWD, xo. Orient MWD 180 deg from retrieval hook. 04:30 - 07:30 3.00 WHIP P RUNPRD Run in hole 7 stands of 4" HT40 DP and 8 stands of 4" HWDP Printed: 9/5/2006 2:49:57 PM gp Page 20 ofi 31 Operations Slummary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7h 5/2006 End: 913/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT `Phase Description of Operations 8/20/2006 04:30 - 07:30 3.00 WHIP P RUNPRD then back to drill pipe from 98' to 5,960'. Shallow hole tested MWD ~ 1,136' - OK. Break circulation every 1,000'. 07:30 - 08:00 0.50 WHIP P RUNPRD Orient hook highside. PU - 135k, SO - 90k. Latched up on first attempt ®6,069'. Picked up to 205k to verify latch without releasing anchor. Picked up and jar twice with 215k up. Anchor released on second jar. Pulled seals free and pick up to 6,040'. Lost 5 bbls of SFMOBM after pulling out of seals. 08:00 - 09:00 1.00 WHIP P RUNPRD Circulate bottoms up ~ 286 gpm, 1,740 psi. Monitor well - OK. Pump dry job. 09:00 - 13:30 4.50 WHIP P RUNPRD POH from 6,040 to 120' without problem and proper pipe displacement. 13:30 - 14:30 1.00 WHIP P RUNPRD PJSM. Laydown whipstock retrieval BHA. Break down dummy seal assembly. 'Whipstock had been milled right of center of tray, digging into main body of whipstock. Examination of whipstock explained the reason for the right hand azimuth swing when drilling out of window. Full window length had been drilled. 14:30 - 15:00 0.50 WHIP P RUNPRD Clear and clean rig floor. 15:00 - 16:00 1.00 CASE P RUNPRD Rig up to run L3 liner assembly. 16:00 -00:00 8.00 CASE P RUNPRD PJSM. Pick up 4.5" 12.6# L-80 BTC-M solid bent joint with float shoe. RIH with 41 jts 4.5" 12.6# L-80 BTC slotted liner, XO, 5 jts solid 4.5" 12.6# L-80 IBT, Swell Packer assembly, 4 jts solid 4.5" 12.6# L-80 IBT, XO, 40 of 75 joints slotted liner to 4,030 ~ end of tour. Make up BTC /IBT liner to 3,800 Ib/Ibs using Best - O -Life 2000 NM. Run floating centralizers on each joint starting with joint #4 in the hole. Record PU and SO weights every 1,000' in cased hole. 8/21/2006 00:00 - 02:00 2.00 CASE P RUNPRD Continue running in hole with OBa slotted liner assembly from 4,030' to 5,859'. Run remaining 35 out of 75 joints of slotted liner, XO, 2 ea spaceout pups, Swell Packer assembly, 8 joints solid liner, Swell Packer assembly, spaceout pup, XO, Baker Flanged Hook Hanger assembly. Checked PU and SO weights every 1,000 tt. in cased hole. 02:00 - 06:00 4.00 CASE P RUNPRD Switch over to drill pipe. RIH 3 stands to 6,147'. Went through window on second attempt after putting 3/4 tum in pipe. PU - 100k, SO - 75k. Continue running in hole with OBa slotted liner assembly on 4" drill pipe and 4' HWDP from 6,147' to 11,300' ~ 60 fpm, checking PU and SO weights every 500 ft. in open hole. 06:00 - 07:30 1.50 CASE P RUNPRD Check parameters. PU - 180k, SO - 65k. Slack off with indication of top Swell Packer dragging through window, PU - 200k, SO - 55k. Run in hole with Hook Hanger assembly 10' past window on first attempt. Make several attempts to hook liner by fuming pipe in 3/4 tum increments. Hang liner on depth. Pick up and tum pipe 180 deg, slack off and run liner hook past window. Pick up above window and tum pipe 180 deg, slack off and pick up several times, hooking liner each time. Set down 20k on hook hanger. Break out topdrive and drop 29/32" ball. Pump ball down ~ 3 bpm, 820 psi. Slow pump to 1.5 bpm, 250 psi prior to seat. Seat ball and pressure up to 3,000 psi and release HR setting tool. Pick up above hook hanger to 5,993' and confirm release from liner with pickup weight of 140k. Pressure up to 4,280 psi to shear ball Printed: 9/5/2006 2:49:57 PM BP Page 21 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase ' Description'of Operations 8/21/2006 06:00 - 07:30 1.50 CASE P RUNPRD seat - OK. `Ran total of 1 jt 4.5" 12.6# L-80 STL pin X BTC box crossover solid liner (shoe joint) 116 jts 4.5" 12.6# L-SO BTC slotted liner 17 jts 4.5" 12.6# L-80 IBT solid liner. Float shoe, PBTMD - 11912' Swell packer - 9,894' to 9,905' Swell packer - 6,487' to 6,498' Swell packer - 6,114' to 6,125' Top of the Hook Hanger - 6,059' 07:30 - 08:00 0.50 CASE P RUNPRD Circulate bottoms up. 220 gpm, 830 psi. Shut down and monitor welt - OK. MW - 9.2 ppg. 08:00 - 09:00 1.00 CASE P RUNPRD Cut and slip drilling line 98'. Clean and inspect brakes - OK. 09:00 - 12:30 3.50 CASE P RUNPRD Pump dry job and POH from 5,993' to 30'. 12:30 - f 3:00 0.50 CASE P RUNPRD PJSM. Service break liner running tools and laydown same. 13:00 - 13:30 0.50 CASE P RUNPRD Clear and clean rig floor. 13:30 - 14:00 0.50 TIEBAC P OTHCMP Pick up LEM running tools to rig floor and rig up running equipment. 14:00 - 16:30 2.50 TIEBAC P OTHCMP Make up LEM 2. Baker Bent Non-Locating Seal Assembly, 2 ea spaceout pup joints, LEM Hook Hanger Assembly, Swivel and Seal Bore Extension w/ 19.69'L x 4.75" ID. Rig up false rotary table and RIH and space out with 2 3/8" EUE inner string. Make up Baker ZXP Liner Top Packer w/ 11' L x 5.75" ID throat. 4.5" IBT connections torqued to 3,800 ft/Ibs. 5.5" HYD torqued to 5,800 fUlbs. All connections lubricated with Best-O-Life 2000. 16:30 - 20:00 3.50 TIEBAC P OTHCMP Run in hole with LEM 2 on 4" drill pipe from 150' to 5,966'. Check parameters. PU - 137k, SO - 87k. 20:00 - 22:30 2.50 TIEBAC P OTHCMP Attempt to work LEM through Flanged Hook Hanger. Pipe would take weight at bottom of window ~ 6,076'. Pick up and work torque by fuming pipe intension 3/4 turns and work past bottom of window but only able to go down 5' to 6,081'. Make numerous attempts by fuming and working pipe to get past 6,081'. If pipe was picked up above the bottom of window, it would have to be worked through bottom of window again. Tried to work between 6,076' and 6,081' to get past 6,081' without success. `6,081 would put the LEM mule shoe in the L3 lateral assembly just under the HR profile. 22:30 -00:00 1.50 TIEBAC N DPRB OTHCMP POH from 6,082' to 4,627' to drop out the swivel assembly and change bent seal assembly to a straight seal assembly. 8/22/2006 00:00 - 02:00 2.00 TIEBAC N DPRB OTHCMP Continue POH with LEM 2 from 4,627' to 150' 02:00 - 04:00 2.00 TIEBAC N DPRB OTHCMP PJSM. Laydown packer. Rig up to laydown 23/8" inner string. Break out swivel assembly, laydown Seal Bore Ext, LEM Hanger, and laydown bent Seal Assembly. 04:00 - 05:30 1.50 TIEBAC N DPRB OTHCMP Pick up straight Seal Assembly, spaceout pups, LEM Hanger, pup joint that replaced swivel assembly, Seal Bore Ext. Rig up and run 23/8" EUE inner string. Make up Baker ZXP Liner Top Packer. 05:30 -09:00 3.50 TIEBAC N DPRB OTHCMP Run in hole with LEM 2, Run #2 from 150' to 5,965' on 4" DP and 4" HWDP. Obtain parameters, PU - 137k, SO - 87k. 09:00 - 10:00 1.00 TIEBAC N DPRB OTHCMP Slack off through top of liner and bottom of window with slight Printed: 9/5/2006 2:49:57 PM gp Page 22 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABORS 9ES Rig Number: Date. From - To Hours Task Code NPT Phase Deseriptjan of Operations 8/22/2006 09:00 - 10:00 1.00 TIEBAC N DPRB OTHCMP reductions in slack off weights. Stacked out at 6,081' on every attempt by fuming pipe in 3/4 tum increments, bouncing pipe, rotating pipe, all without exiting bottom of window @ 6,076' and entering L3 liner. 10:00 - 13:30 3.50 TIEBAC N DPRB OTHCMP Pump dry job and POH from 6,061' to 290' to change out straight Seal assembly for bent Seal assembly 13:30 - 14:00 0.50 TIEBAC N DPRB OTHCMP PJSM. Rig up to laydown LEM assembly. 14:00 - 16:00 2.00 TIEBAC N DPRB OTHCMP Laydown LEM, stand back inner string. No markings on mule shoe. 16:00 - 16:30 0.50 TIEBAC N DPRB OTHCMP Prepare rig floor, laydown straight Seal assembly, pick up Bent Seal assembly. 16:30 - 18:00 1.50 TIEBAC N DPRB OTHCMP Pick up bent Seal Assembly, spaceout pups, LEM Hanger, pup joint, Seal Bore Ext. Rig up and run 23/8" EUE inner string. Make up Baker ZXP Liner Top Packer. 18:00 - 21:00 3.00 TIEBAC N DPRB OTHCMP Run in hole with LEM 2, Run #2 from 150' to 5,965' on 4" DP and 4" HWDP. Obtain parameters, PU - 138k, SO - 86k. 21:00 - 00:00 3.00 TIEBAC N DPRB OTHCMP Slack off and go through top of liner OK. Tagged up on bottom of window. Pick up and turn pipe 3/4 tum. Slack off and tag up ~ 6,081'. Pick up and start turning pipe in 1/4 tum increments starting ~ 6,063'. Repeat process going down in 1 ft. increments to bottom of window ~ 6,076' stopping pipe on torque peaks (same location on pipe each time) then slacking off on pipe without success tagging up ~ 6,081' every time. Tried rotating G~ 4 rpm through window without success. 8/23/2006 00:00 - 03:00 3.00 TIEBAC N DPRB OTHCMP Pump dry job. POH from 6,061 to 160'. 03:00 - 05:00 2.00 TIEBAC N DPRB OTHCMP PJSM. Laydown LEM #2. Rig up and stand back inner string. Mule shoe had grooves on the opposite side of where they were on first run. Grooves ran from bottom of shoe to 18 inches above. Bottom set of seals were damaged. 05:00 - 05:30 0.50 TIEBAC N DPRB OTHCMP Clear and clean rig floor. Pick up dummy LEM to rig floor. 05:30 -06:00 0.50 TIEBAC N DPRB OTHCMP Make up dummy LEM, XO, float sub, MWD, XO. 06:00 - 08:30 2.50 TIEBAC N DPRB OTHCMP Run in hole with dummy LEM assembly from 67' to 5,968'. Shallow hole tested MWD ~ 1,105'. 08:30 - 09:00 0.50 TIEBAC N DPRB OTHCMP Fill pipe, break circulation. PU - 140k, SO - 85k. Slack off pipe to above liner top and orient dummy LEM to 20 deg right of high side. 308 gpm, 1,730 psi. Slack off and latch up dummy LEM on liner top. Toolface flopped over to 96 deg right of high side. Pick up and unlatch from liner. Toolface went from 96 deg to 72 deg. Slack back off and re-latch. Toolface went back to 96 right. Pick up and unlatch LEM, stand back 1 stand of drill pipe. 09:00 - 09:30 0.50 TIEBAC N DPRB OTHCMP Circulate bottoms up ~ 6,063' ~ 308 gpm, 1,730 psi. Observe well - OK. MW - 9.3 ppg. 09:30 - 12:30 3.00 TIEBAC N DPRB OTHCMP Pump dry job. POH from 6,063' to dummy LEM. Laydown dummy LEM assembly. 12:30 - 13:00 0.50 TIEBAC N DPRB THCMP Service topdrive, crown, and drawworks. 13:00 - 20:00 7.00 TIEBAC N DPRB OTHCMP Wait on truck to deliver bent 3.5" tubing joint. 20:00 - 22:00 2.00 TIEBAC N DPRB OTHCMP Rig up and make up bent joint assembly. 3.5" tubing joint, XO, 4.5" tubing joint, XO, float sub, MWD, XO. Maximum OD - 5.23" on 4.5" tubing collar. 22:00 -00:00 2.00 TIEBAC N DPRB OTHCMP Run in hole with bent joint assembly from 124' to 2,400'. Shallow hole tested MWD ~ 1,527' - OK. 8/24/2006 00:00 -00:30 0.50 TIEBAC N DPRB OTHCMP Run in hole with 3.5" bent joint assembly from 2,400' to 6,034'. Printed: 9/52006 2:49:57 PM BP Page 23 of 31 ..Operations Summary Report. Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3!2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8!24/2006 00:00 - 00:30 0.50 TIEBAC N DPRB OTHCMP PU - 130k, SO - 85k. 00:30 - 02:30 2.00 TIEBAC N DPRB OTHCMP Fill pipe and break circulation ~ 301 gpm, 1,890 psi. Orient above liner top ~ 90 deg left. Slack off and tag up ~ 6,070', pick up and tum pipe 1/8 tum. 'Note: MWD quit giving good tool faces once inside of liner due to noise. Slack off and tag up ~ 6,069'. Pick up and tum pipe 1/8" tum. Tum off pumps and slack off and go down hole taking 0-7k weight and tag up ~ 6,116' with 15k, with 4.25" OD collar ~ 6,081'. Pick up to above bottom of window, pulling 30k over pick up weight. Bring pumps up to 301 gpm, 1,890 psi and slack back off going down without taking weight. Tag up ~ 6,115' with 15k and 100 psi increase in pump pressure. Pick up without taking weight and pump pressure returning to normal. Turn pipe 180 deg, slack off and tag up ~ bottom of window. Pick up and turn pipe 1/8" turn. Slack off and run in Mother Bore hole without taking weight until 6,144' with MWD STAB landing on top of liner. Bottom of 3.5" mule shoe ~ 6,144' (mule shoe 17' inside of SBR). Stand back 2 stands with no drag. Observe well - OK. MW - 9.3 PPg• 02:30 - 05:00 2.50 TIEBAC N DPRB OTHCMP Pump dry job and POH from 6,030' to 133'. 05:00 - 06:00 1.00 TIEBAC N DPRB OTHCMP Rig up and laydown 3.5" bent joint assembly. Small amount of scarring on 4.5" x 3.5" crossover. Mule shoe OK. 06:00 - 06:30 0.50 TIEBAC N DPRB OTHCMP Clear and clean rig floor. 06:30 - 08:00 1.50 TIEBAC N DPRB OTHCMP Pick up and make up LEM 2, Run #4. Bent non locating seal assembly with bend ~ 10' up from mule shoe, 7" off center. Mule shoe oriented 180 deg from previous bent seal assembly, 2 ea 4.5" 12.6# L-80 IBT space out pups, LEM Hanger assembly, 4.5` IBT pup joint, XO bushing, Baker Seal Bore Extension w/ 19.69' L x 4.75" ID, rig up and run 23/8" EUE inner string. Make up Baker ZXP Liner Top Packer w/ 11' L x 5.75" throat, Hydraulic setting tool. 08:00 - 11:00 3.00 TIEBAC N DPRB OTHCMP Run in hole from 149' to 6,061'. Make up topdrive. 11:00 - 12:30 1.50 TIEBAC P OTHCMP Fitl pipe and break circulation. PU- 135k, SO - 90k. Slack off and tag up inside of L3 liner ~ 6,081'. Pick up and turn pipe 1/8" turn. Slack off and tag up inside of L3 liner ~ 6,081'. Pick up and turn pipe 1/8" turn. Slack off and enter Mother Bore and tag up on top of Seal Bore Extension ~ 6,127'. Pick up and turn pipe 40 deg. Break circulation and wash down and enter Seal Bore Extension without any down drag. Slack off and set with 30k down weight to latch LEM with seat assembly 11 ff inside of Seal Bore Extension. Pick up 25k over string weight to verify latch-up. Slack off and re-latch LEM with 30k under slack off weight. Pick up to 125K up weight. Break out topdrive, drop 13/4" ball and pump same with 3 bpm, 900 psi. Reduce pump rate to 2 bpm, 610 psi prior to ball landing. Seat ball and pressure up to 3,000 psi to set packer. Slack off to 105k and increase pressure to 4,000 psi to release HR running tool. Bleed off pressure and test annulus to 1,500 psi - OK. Bottom of seals X6,141' Top of LEM 2 ~ 6,003' 12:30 - 13:00 0.50 TIEBAC P OTHCMP Circulate bottoms up ~ 197 spm, 932 psi. Monitor well - OK. MW - 9.3 ppg. Printed: 9/5/2006 2:49:57 PM gp Page 24 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/24/2006 13:00 - 15:30 2.50 TIEBAC P OTHCMP Pump dry job and POH from 6,000' to 145'. 15:30 - 16:30 1.00 TIEBAC P OTHCMP PJSM. Service break running tool. Rig up and laydown 2 3/8" inner string 16:30 - 17:00 0.50 TIEBAC P OTHCMP Clear and clean rig floor. 17:00 - 19:00 2.00 WHIP P WEXIT PJSM. Pick up and make up Whipstock assembly #3 for OA window. Seal assy, no go, unloader sub, 1 jt 3.5" HWDP, xo, PxP sub, safety disconnect, unloader, debris sub, ported sub, whipstock, window mill, lower mill, flex joint, upper mill, 1 jt 3.5" HWDP, float sub, MWD, bumper sub, 9 43/4" DC's, 7 stands 4" drill pipe, 8 stands 4" HWDP to 1,855'. Shallow hole tested MWD ~ 1,098'. 19:00 - 22:30 3.50 WHIP P WEXIT Run in hole with whipstock assembly from 1,855' to 5,967'. Filled pipe ~ 4,100'. Make up top drive. 22:30 - 23:00 0.50 WHIP P WEXIT Establish circulation ~ 298 gpm, 2,350 psi. PU - 130k, SO - 85k. Orient whipstock to 13 deg left of high side. Slack off and stab dummy seals and verify orientation - OK. Slack of 20k to set anchor. Pick up to 10k over string weight to confirm anchor set. Slack off and set 30k to shear lugs. Test backside with 1,500 psi - OK. Blowdown lines. 23:00 -00:00 1.00 WHIP P WEXIT Displace well from 9.3 ppg SF MOBM to 9.2 ppg MOBM ~ 289 gpm, 2,165 psi. 8/25/2006 00:00 - 01:00 1.00 WHIP P WEXIT Continue displacing well from 9.3 ppg SF MOBM to 9.2 ppg MOBM ~ 289 gpm, 2,165 psi. Obtain slow pump rates. 01:00 - 06:30 5.50 STWHIP P WEXIT Mill OA window starting top of window ~ 5,930 to bottom of window ~ 5,942'. 247 gpm, 1,415 psi, 60 rpm, 6k TO. Continue drilling with starting mill from 5,942' to 5,962' putting upper mill through bottom of window. 247 gpm, 1,385 psi, 105 rpm, 4-5k TO. PU - 125k, SO - 85k, RT - 100k. 06:30 - 08:00 1.50 STW HIP P WEXIT Pump 50 bbl high vis, 2 Ib over weighted sweep while wiping up and down through window. No increase in cuttings when sweep returned to surface. Shut down pump and wipe in and out of window without problem. Monitor well - OK. MW - 9.2 ppg. Pump dry job. 08:00 - 10:00 2.00 STWHIP P WEXIT POH from 5,930' to 372'. PU - 133k, SO - 95k. 10:00 - 11:30 1.50 STWHIP P WEXIT Stand back 43/4" drill collars. Laydown whipstock milling assembly. Upper mill was in gauge. 11:30 - 12:00 0.50 STWHIP P WEXIT Clear and clean rig floor. 12:00 - 13:00 1.00 BOPSU P WEXIT Pull wear bushing. Make up BOP stack jetting tool and flush stack and flow line. Function all BOP's. Laydown jetting tool. Install wear bushing. 13:00 - 14:30 1.50 DRILL P PROD5 PJSM. Pick up and make up OA 63/4" BHA #17, RR Hycalog DS 146 bit, 1.5 bent motor with AIM, bypass sub w/ float, NM STB, MWD/LWD, orient and load nuclear source, VPWD, ADN, 2 ea NM flex DC's, Circ sub, XO, 1 joint 4" DP, Jar - 236'. 14:30 - 15:00 0.50 DRILL P PRODS Run in hole with BHA #17 from 236' to 510'. 15:00 - 15:30 0.50 DRILL P PRODS Crew held safety meeting with Crane Pro rep. Jason Gammon and Arctic Wire Rope rep. Gary Moore. 15:30 - 18:00 2.50 DRILL P PROD5 Continue run in hole with BHA #17 from 510' to 5,878'. Shallow hole tested MWD ~ 1,192'. Filled pipe ~ 4,061' i 8:00 - 19:00 1.00 DRILL P PRODS Slip and cut drilling line 98'. Inspect and adjust brakes. 19:00 -20:00 1.00 DRILL P PROD5 Service topdrive, crown, blocks, and drawworks. 20:00 -20:30 0.50 DROLL P PROD5 Establish circulation. Obtain slow pump rates. CECD - 10.13 ppg. Orient high side and RIH from 5,878', through window Printed: 9/5/2006 2:49:57 PM BP Page 25 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABORS 9ES Rig Number: Date From - To' Hours Task Code NPT Phase Description of Operations 8/25/2006 20:00 - 20:30 0.50 DRILL P PROD5 from 5,930' to 5,942' without problem. Continue wash down to 5,962' 20:30 - 21:30 1.00 DRILL P PRODS Directionally drill 6.75" OA L4 from 5,962' to 5,995' 100% sliding. 285 gpm, 2,180 psi off, 2,300 psi on, PU - 120k, SO - 85k, WOB - 10k. CECD 10.13 ppg, AECD - 9.93 ppg. 21:30 - 22:00 0.50 DRILL P PROD5 Pump up survey. 22:00 - 22:30 0.50 DRILL P PRODS Directionally drill 6.75" OA L4 from 5,995' to 6,034' 100°/° sliding. 285 gpm, 2,180 psi off, 2,300 psi on, PU - 120k, SO - 85k, WOB - 10k. CECD 10.13 ppg, AECD - 9.93 ppg 22:30 - 23:30 1.00 DRILL P PRODS Pump up survey. Had trouble with pumping surveys up. Getting spike in the survey frame. Attempted surveys at different pump rates with both pumps. Checked out troth pump prior to drilling out. Suction and discharge screens had been cleaned. Both pump pulsation dampeners had correct pressures. Finally were able to get surveys with some MWD software adjustments and only using one pump. 23:30 - 00:00 0.50 DRILL P PROD5 Directionally drill 6.75" OA L4 from 6,034' to 6,068' 100% sliding. 285 gpm, 2,180 psi off, 2,300 psi on, PU - 120k, SO - 85k, WOB - 10k. CECD 10.13 ppg, AECD - 9.93 ppg, AST - .93 hrs. 8/26/2006 00:00 - 12:00 12.00 DRILL P PRODS Directionally drill 6.75" OA L4 from 6,068' to 6,610'. 290 gpm, 2,380 psi off, 2,832 psi on, PU - 136k, SO - 83k, RT - 106k, WOB - 5-15k, 60 rpm, 4.5k TO off, 5.5k TO on. CECD 10.21 ppg, AECD - 10.39 ppg. AST - 3.18 hrs, ART - 2.28 hrs. Survery every joint, backream each stand 60' prior to connections, Problem found with surveys. # 2 mud pump's pulsation dampener fill-up needle valve had leaked out nitrogen. Filled back up with proper nitrogen pressure and have had no problem with surveys. 'Drilled into OBa ~ 6,125'. Back into OA ~ 6,272' 12:00 - 00:00 12.00 DRILL P PRODS Directionally drill 6.75" OA L4 from 6,610' to 8,334'. 290 gpm, 2,500 psi off, 2,650 psi on, PU - 135k, SO - 85k, RT - 108k, WOB - 10k, 60 rpm, 5k TO off, 6k TO on. CECD 10.27 ppg, AECD - 10.35 ppg. AST - 3.4 hrs, ART - 2.25 hrs. Survery every joint, backream each stand 60' prior to connections. Started having problem with surveys again. Changed out # 2 mud pump's pulsation dampener while still drilling with 1 pump ~ 290 gpm. Good surveys after dampener changed out. 8/27/2006 00:00 - 12:00 12.00 DRILL P PROD5 Directionally drill 6.75" OA L4 from 8,334' to 9,863'. 290 gpm, 2,736 psi off, 3,010 psi on, PU - 146k, SO - 73k, RT - 103k, WOB - 5-15k, 60 rpm, 6.4k TO off, 7.8k TO on. CECD 10.31 ppg, AECD - 10.80 ppg. AST - 1.33 hrs, ART - 2.10 hrs. Survey every 30', backream 60' prior to connections. Pumped 30 bbl high vis, 2 Ib over weighted sweep ~ 9,000' and returned appx 10% increase in cuttings when back to surface. 12:00 -00:00 12.00 DRILL P RODS Directionally drill 6.75' OA L4 from 9,863' to 11,489'. 290 gpm, 2,890 psi off, 3,100 psi on, PU - 150k, SO - 70k, RT - 106k, WOB - 5-15k, 60 rpm, 7k TO off, 8k TO on. CECD 10.41 ppg, AECD - 10.83 ppg. AST - 1.22 hrs, ART - 3.68 hrs. Survey every 30', backream 60' prior to connections. 8/28/2006 00:00 - 02:30 2.50 DRILL P PRODS Directionally drill 6.75" OA L4 from 11,489' to TD ~ 11,890' MD, 4,555' ND. 290 gpm, 2,730 psi off, 3,178 psi on, PU - 159k, SO - 69k, RT - 102k, WOB - 5-15k, 60 rpm, 7.1 k TQ off, Printed: 9/5/2006 2:49:57 PM gp Page 26 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Gode NPT Phase. Description of Operations 8/28/2006 00:00 - 02:30 2.50 DRILL P PROD5 8.3k TO on. CECD 10.42 ppg, AECD - 10.82 ppg. AST - .5 hrs, ART - .75 hrs. Survey every 30', backream 60' prior to connections. 02:30 - 04:00 1.50 DRILL P PRODS Circulate, rotate and reciprocate for 15 minutes to check ECD's prior to pumping sweep - OK. Pump 2 Ib weighted sweep surface to surface with no increase in cuttings when sweep back to surface. 290 gpm, 2890 psi, 60 rpm, 7.5k TO. CECD - 10.42 ppg, RECD - 9.99 ppg. 04:00 - 12:00 8.00 DRILL P PROD5 Madpass log from bit depth of 11,890' to 9,576' ~ 600 fph, 290 gpm, 2,850 psi, 60 rpm, 8.1 k TO. CECD - 10.42 ppg, AECD - 9.99 PPg• 12:00 - 00:00 12.00 DRILL P PROD5 Madpass log from bit depth of 9,576' to 6,490'. All depths logged ~ 600 fph except Swell Packer intervals from 9,110' to 8,970' and 8,610' to 8,470', 6,630' to 6,490' ~ 200 fph. 290 gpm, 2,140 psi, 60 rpm, 4k TO. CECD - 10.15 ppg, AECD - 10.05 ppg. 8/29/2006 00:00 - 02:00 2.00 DRILL P PROD5 Continue Madpass logging from bit depth of 6,490' to 6,160' ~ 600 fph, 6,160' to 6,135' ~ 200 fph. 290 gpm, 2,080 psi, 60 rpm, 4.3k TO. Stop rotating, orient bit ~ 10 deg right. Continue Madpass from 6,135' to 5,973' (Bit depth) without rotating. Pull 1 more stand to get bit into casing to 5,878' 02:00 - 02:30 0.50 DRILL P PRODS Service topdrive, blocks, and crown. 02:30 - 05:30 3.00 DRILL P PROD5 Run in hole from 5,878' to 11,776' with one tight spot ~ 9,000'. Picked up and filled pipe ~ 8,990' and went back down without problem with pump off. Precautionary wash from 11,776' to 11,890' 05:30 - 08:00 2.50 DRILL P PROD5 Circulate bottoms up ~ 290 gpm, 2,950 psi, 102k rotating weight, 60 rpm, 7k TO. Prepare to displace to SF MOBM. 08:00 - 09:30 1.50 DRILL P PRODS Displace hole from 9.2 ppg MOBM to 9.2 ppg SF MOBM ~ 290 gpm, 2,950 psi, 102k rotating weight, 60 rpm, 7k TO. 09:30 - 10:00 0.50 DRILL P PROD5 Monitor well - OK. POH from 11,890' to 11,383'. Pump dry job. PU - 173k, SO - 73k. 10:00 - 16:00 6.00 DRILL P PROD5 POH from 11,383' to 236'. Recorded up and down weights every 500' in open hole, and every 1,000' in cased hole. 16:00 - 17:30 1.50 DRILL P PROD5 PJSM. Laydown BHA #17. LD jars. LD flex collars. Remove nuclear source and LD ADN. LD PWD, MWD, nm stab, bypass sub w/float, AIM motor and bit. 6-3/4" Hycalog DS 146h+gjuw graded: 0-1-WT-S-X-I-NO-TD (no change from previous runs). 17:30 - 18:30 1.00 DRILL P PROD5 Clear and clean rig floor. Laydown drilling tools off of rig floor. 18:30 - 19:00 0.50 WHIP P RUNPRD PJSM. MU Whipstock Retrieval BHA #18 to 1,506' -retrieving tool, 1 jt 3.5" HWDP, float sub, MWD bumper sub, xo. Orient MWD 180 deg from retrieval hook. 19:00 - 22:00 3.00 WHIP P RUNPRD Run in hole with Whipstock retrieval assembly from 99' to 5,904. Shallow hole tested MWD ~ 1,505' - OK 22:00 - 22:30 0.50 WHIP P RUNPRD Check parameters, PU - 135k, SO - 90k. Bring up pumps and orient 167 deg right. Run in hole slow to below top of window ~ 5,935'. Pick up and latch on 1st attempt. Pick up and shear anchor ~ 80k over. Slack back down and set down 25k to close jars. Pick up and jar free on 3rd attempt ~ 65k over pull. Pull seals out of LEM 2. Lost 10 bbls SF MOBM. 22:30 - 00:00 1.50 WHIP P RUNPRD Circulate bottoms up ~ 299 gpm, 1,880 psi. Monitor well - OK. 9.2 ppg MW. Pump dry job. Printed: 9/52006 2:49:57 PM gp Page 27 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT` Phase Description of Operations 8/30/2006 00:00 - 02:30 2.50 WHIP P RUNPRD POH with L4 whipstock #3 from 5,935' to 99'. 02:30 - 03:30 1.00 WHIP P RUNPRD PJSM. Laydown whipstock retrieval BHA. Break down dummy seal assembly. 'Whipstock had indication of 8 ft window cut. Had slight right hand roll-off ending appx 20 deg right at bottom of slide. 03:30 - 04:00 0.50 WHIP P RUNPRD Clear and clean rig floor. 04:00 - 05:00 1.00 CASE P RUNPRD Rig up to run L4 slotted 4.5" liner assembly. Pick up pup joint and crossovers to rig floor. 05:00 - 12:00 7.00 CASE P RUNPRD PJSM. Pick up and make up solid joint with shoe, 69 jts slotted liner, xo, pup jt, Swell Packer assy, 10 jts solid liner 3 ea pup jts, Swell Packer assy, xo, 48 jts slotted liner, xo, pup jt, Swell Packer assy, 10 jts solid liner, 2 pup jts, Swell Packer assy, xo, Flanged Hook Hanger assy with swivel to 5,959'. 3,800 fUlbs make up torque, lubricated with Best-O-Life 2,000. Ran total of: 21 jts {incl x-over bent jt with shoe) 4.5" 12.6# L-80 IBT solid liner. 118 jts 4.5" 12.6# L-80 BTC r3 slotted liner. 4ea 4.5" x 6.3" OD Swell Packer assemblies 7 IBT spaceout pups 4 crossover pups 137 5 3/4" x 4.5" x 8"L straight blade centralizers on joints 2 - 138 2 centralizers on each side of Swell Packers for total of 145 centralizers. 12:00 - 13:00 1.00 CASE P RUNPRD Make up crossover and 1 stand drill pipe. PU - 100k, SO - 70k. Pick up above window ~ 5,930'. Check rpm and torque. 7 rpm, 2.5k TO, RWT - 90k. Run in hole and tag up ~ 6,018' with 5k. Pick up above window and tum string 180 deg. Run in hole and tag up ~ 6,018' with 5k. Pick up above window and tum string 90 deg. Run in hole and tag up ~ 6,018' with 5k. Pick up to 5,935' and rotate ~ 7 rpm, catch torque peak ~d 3.6k and run in L4 hole OK to 6,057' 13:00 - 16:30 3.50 CASE P RUNPRD Continue run in hole with slotted liner assembly from 6,057' to 11,853'. Record pick up and slack off weights every 500'. 16:30 - 18:00 1.50 CASE P RUNPRD Break circulation and obtain parameters. PU - 170k, SO - 70k. Run in hole and hook liner. Pick up and slack off and hook hanger again. Pick up and tum pipe 180 deg. Run in hole past window 10' several times. PU - 190k, SO - 70k. Pick up and turn pipe 180 deg and make several attempts before hooking hanger again. Pick up and set down on hanger several times with 25k - OK. Break out surface pipe connection and drop ball. Pump ball down ~ 2.5 bpm, 535 psi. Slow pump rate to 1.5 bpm, 390 psi prior to ball seating. Seat ball and pressure up to 3,080 psi to shear HR running tool. Pressure up to 4,300 psi to shear ball seat. Pick up and confirm liner release with running tool above top of L4 liner top to 5,892'. PU - 135k. Liner set with shoe ®11,879' Swell Packer ~ 8,935 to 8,945' Swell Packer ~ 8,464' to 8,474' Swell Packer ~ 6,457' to 6,467' Printed: 9/5/2006 2:49:57 PM BP Page 28 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date `From - To Hours Task Code. NPT Phase Description of Operations 8/30/2006 16:30 - 18:00 1.50 CASE P RUNPRD Swell Packer ~ 5,974' to 5,984' Top of L4 liner ~ 5,925' 18:00 - 19:00 1.00 CASE P RUNPRD Circulate bottoms up ~ 260 gpm, 1,155 psi. Monitor well - OK MW 9.3 ppg. 19:00 - 20:00 1.00 CASE P RUNPRD Cut and slip drilling line 80'. 20:00 - 23:30 3.50 CASE P RUNPRD Pump dry job. PU - 135k, SO - 70k. POH from 5,892' to running tool. Make service breaks on running tool and laydown. 'Layed down 9 joints 43/4" drill collars on trip out of hole. 23:30 -00:00 0.50 CASE P RUNPRD Clear and clean rig floor. 8/31/2006 00:00 - 00:30 0.50 BOPSU P RUNPRD Flush stack. Pull wear bushing, install BOP test plug. 00:30 - 01:00 0.50 BOPSU P RUNPRD Rig up to test BOPE. 01:00 - 05:00 4.00 BOPSU P RUNPRD Pressure test ROPE to 250 psi low, 3,500 psi high for 5 minutes each on all equipment. Tested variable bore rams with 4" and 4.5" test joints. Perform accumulator test. Witnessing of test waived by AOGCC rep Lou Grimaldi. Test witnessed by BP WSL R. French and NAD TP R. Hunt. 05:00 - 05:30 0.50 BOPSU P RUNPRD Rig down test equipment. Pull test plug, install wear bushing. 05:30 - 06:30 1.00 TIEBAC P OTHCMP Rig up to run L4 LEM #3. 06:30 - 08:00 1.50 TIEBAC P OTHCMP Pick up and make up L4 LEM 3 assembly. Baker Non-Locating Seal Assembly, 1 ea 4.5" 12.6# L-80 tBT box X STL pin x-over joint, 1 ea 4.5" 12.6# L-80 IBT liner joint, LEM Hook Hanger Assembly, 1 ea IBT space out pup. Rig up false rotary table and RIH and space out with 23/8" EUE inner string with 1.75' stickout. Make up Baker ZXP Liner Top Packer w/ 11' L x 5.75" ID throat. 4.5" IBT connections torqued to 3,800 fUlbs. All connections lubricated with Best-O-Life 2000. 08:00 - 10:00 2.00 TIEBAC P OTHCMP Run in hole with LEM assembly on 4" drill pipe and HWDP from 169' to 5,880'. 10:00 - 12:00 2.00 TIEBAC P OTHCMP Obtain parameters. PU - 135k, SO - 85k , 118 gpm, 580 psi. Wash down from 5,880' through hook hanger and observe seals entering LEM #2 SBE. Latch up LEM #3 on L4 liner top on depth. Set down 30k, pick up 15k over string weight to 150k to release LEM. Slack off and re-latch LEM. Set down 30k. Pick up 10k over string weight to confirm latch-up. Drop ball and pump same to seat ~ 3 bpm 650 psi. Seat ball and pressure up to 4,000 psi to set packer and release running tool. Packer set indication ~ 3,100 psi. Bleed off pressure, close rams, and pressure up annulus to 1,500 psi for 10 minutes to confirm packer setting. Good test. Pick up to 5,976' (inner string depth) Bottom of seals ~ 6,036' (13.45 ft inside of LEM #2 SBE) Top of LEM #3 ZXP liner top packer ~ 5,878' 12:00 - 15:00 3.00 TIEBAC P OTHCMP Displace well from 9.3 ppg SF MOBM to 9.2 NaCI brine. Pumped 30 bbls LVT-200 base oil followed by 25 bbls viscosified 9.2 ppg brine, followed by 50 bbls of Safe Surf O mixed with 9.2 ppg brine, followed by clean 9.2 ppg brine. Pumped until clean brine returned to surface. 218 gpm, 415 psi. 15:00 - 17:00 2.00 TIEBAC P OTHCMP Observe well - OK. Clean surface mud equipment. Clean out from under shakers, mud troughs and possum belly. 17:00 -00:00 7.00 TIEBAC P OTHCMP POH laying down drill pipe and HWDP from 5,946' to 750' Printed: 9/5/2006 2:49:57 PM BP Page 29 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date I From - To I Hours I Task.` 1 Code I NPT Start: 7/15!2006 Rig Release: 9/3/2006 Rig Number: Spud Date: 7/16/2006 End: 9/3/2006 9/1/2006 100:00 - 00:30 I 0.501 TIEBAC I P 00:30 - 01:30 I 1.001 TIEBAC I P 01:30 - 03:00 I 1.501 TIEBAC I P 03:00 - 03:30 I 0.50 I TIEBAC I P 03:30 - 06:30 3.00 TIEBAC P 06:30 - 08:00 1.50 TIEBAC P 08:00 - 08:30 I 0.50 I TIEBAC I P 08:30 - 12:00 I 3.501 TIEBAC I P 12:00 - 12:30 0.50 TIEBAC P 12:30 - 14:30 2.00 BUNCO 14:30 - 15:30 1.00 15:30 - 00:00 8.50 RU 9/2/2006 00:00 - 01:30 1.50 RU 01:30 - 02:30 I 1.00 02:30 - 03:30 1 1.00 03:30 - 04:00 I 0.50 Phase ( Description of Operations OTHCMP Continue POH with LEM running tool laying down drill pipe from 750' to running tool and inner string ~ 140'. OTHCMP Laydown running tool. Rig up and lydown 23/8" EUE inner string. Clear rig floor. OTHCMP Run in hole to 3,252' with half of drill pipe out of derrick. 4" mule shoe on bottom of drill pipe. OTHCMP Circulate 30 bbl brine soap pill surface to surface to clear drill pipe of SF MOBM. 294 gpm, 306 psi. PU - 89k, SO - 69k. MW - 9.2 ppg OTHCMP Monitor well. POH laying down drill pipe from 3,252' to surface OTHCMP Run in hole to 3,186' with half of drill pipe out of derrick. 4" mule shoe on bottom of drill pipe. OTHCMP Circulate 30 bbl brine soap pill surface to surface to clear drill pipe of SF MOBM. 294 gpm, 306 psi. PU - 89k, SO - 69k. MW - 9.2 PP9 OTHCMP Monitor well. POH laying down drill pipe from 3,186' to surface. Laydown mule shoe. OTHCMP Clear and clean rig floor. Pull wear bushing. RUNCMP Rig up to run 4.5" 12.6# 13Cr80 r3 Vam Top completion string. Change out bales. Rig up compensator, rig up I-Wire spool and sheeve. RUNCMP PJSM with all personnel involved. Pick up completion jewelry as per detail to the Phoenix CST Jet pump gauge. ~ 99'. Hook up 1-Wire to Phoenix assembly. RUNCMP Continue running in hole with tubing jewelry and tubing from 96' to 4,885' RUNCMP Continue running in hole with 4.5" 12.6# 13Cr80 Vam Top completion string from 4,885' to 5,803' RUNCMP Space out tubing for bottom of mule shoe placement ~ 5,886'. Tagged upon bottom of Tie Back Sleave ~ 5,889'. Lay down 3 joints of tubing, pick up 2 ea space-out pups, pick last joint of tubing. Pick up and make up tubing hanger and landing joint. RUNCMP Make I-Wire connection throught tubing hanger. Test hydraulic fitting to 5,000 psi - 5 minutes - OK. Test I-Wire continuity - OK. Terminate I-Wire connection end, wrap around hanger neck. RUNCMP Drain BOP stack. Land tubing. PU - 94k, SO - 75k. Run in tubing hanger lock-down screws. Ran total of 133 jts, 5,580' 4.5" 12.6# 13Cr80 r3 Vam Top tubing joints. 75 ea I-Wire Full Clamps 3 ea I-Wire Half Clamps Mule shoe ~ 5886' (8 ft inside of L4 LEM #3 Tie Back Tops: 4.5" TCII HES "X" Nipple 3.813" ID ~ 5,860' 4.5" TCII HES "X" Nipple 3.813" ID w/ RHC plug ~ 5,839' 7.625" x 4.5" Baker Premier Packer ~ 5,812' Phoenix CST Jet Pump Gauge ~ 5,790' 4.5" 13Cr HES "XD" Duro Sliding Sleeve ~ 5,769' 4.5" Phoenix Discharge Pressure Sensor ~ 5,758' GLM #1 - 4.5" 1" KBG-2, 9Cr, w/ DCK-2 Shear & BEK latch ~ Printed: 9/5!2006 2:49:57 PM BP Page 30 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: ...Date From - To <Hours Task Code NPT Phase Description: o€ Operations 9/2/2006 03:30 - 04:00 0.50 BUNCO RUNCMP 5,648'. GLM #2 - 4.5" 1" KBG-2, 9Cr, w/ RD Dummy, SBK-2C latch ~ 5,537' GLM #3 - 4.5" 1"KBG-2, 9Cr, w/ RD Dummy, SBK-2C latch C~3 4,590' GLM #4 - 4.5" 1" KBG-2, 9Cr, w/ RD Dummy, SBK-2C latch ~ 3,011' 4.5" TCII HES "X" Nipple 3.813" ID ~ 2,192' 2 ea 4.5" 12.6# 13Cr80 r3 Vam Top tubing space out pups under top joint of tubing. FMC Tubing Hanger with 1 ft of Blast Rings below hanger on pup jt with 4.5" TCII lifting threads. 04:00 - 07:00 3.00 BUNCO RUNCMP Rig up to circulate. Reverse circulate complete hole volume with 245 bbls of clean 9.2 ppg NaCI brine ~ 125 gpm, 250 psi, followed by 90 bbls of clean 9.2 ppg NaCI brine, followed by 87 bbls 9,2 ppg NaCI brine treated with corrosion inhibitor, followed by 68 bbls of clean 9.2 ppg NaCI brine. 07:00 - 10:00 3.00 BUNCO RUNCMP Drop 1 7/8" ball and rod. Wait to seat. Pressure up to 4,000 psi to set packer. Hold 4,000 psi for 30 minute tubing test - OK. Bleed tubing pressure down to 2,500 psi. Pressure up annulus to 3,500 psi for packer and casing test - 30 minutes - OK. Bleed off annulus pressure to 0 psi, bleed off tubing pressure to 0 psi. Pressure up and shear out DCK valve with 2,800 psi. Pump through valve a few bbls each way to confirm opening of valve. 10:00 - 10:30 0.50 BUNCO RUNCMP Install 2-way-check valve. Test valve by pressuring up annulus to 1,000 psi - OK 10:30 - 12:00 1.50 BUNCO RUNCMP Rig down liner running equipment. Clear and clean rig floor. 12:00 -00:00 12.00 CLEAN P POST Start MOBM cleanup of derrick windwalls, pull floor mats and clean rig floor and pipe racks. Clean out drip pan. Clean mud pits and mud room of oil base mud. 9/3/2006 00:00 - 03:00 3.00 CLEAN P POST Continue cleaning rig Clean derrick windwalls, pull floor mats and clean rig floor and pipe racks. Clean out drip pan. Clean mud pits and mud room of oil base mud. 03:00 - 04:00 1.00 BOPSU P RUNCMP Nipple down BOP stack. Disconnect turnbuckles, pull riser, set stack on BOP stand. 04:00 - 06:30 2.50 WHSUR P RUNCMP Clean top of tubing hanger. Run t-Wire through tree adaptor flange. Nipple up tree adaptor flange with I-Wire oriented towards reserve pit. Test adapter flange to 5000 psi 06:30 - 09:00 2.50 WHSUR P RUNCMP Nipple up tree and test to 5,000 psi 09:00 - 10:00 1.00 WHSUR P RUNCMP Rig up DSM Lubricator and pull TWC, rig down lubricator 10:00 - 13:00 3.00 WHSUR P RUNCMP PJSM, Rig up Little Red and test lines to 3,000 psi, Freeze protect tubing and IA to 2,550' with 106 bbls diesel ~ 2.5 bpm, ICP 550 psi, FCP 900 psi. 13:00 - 14:00 1.00 WHSUR P RUNCMP Allow diesel to U-Tube. Final SIP's: OA - 0 psi, IA - 70 psi, Tbg - 0 psi. 14:00 - 15:00. 1.00 WHSUR P RUNCMP Install BPV w/ lubricator and test from below to 1,000 psi, Remove double annulus valve on tubing head, install VR plugs, secure well for move. Release Rig from L-204 ~ 15:00 hrs, 9/3/2006 for 2006 Yearly Printed: 9/5/2006 2:49:57 PM g p Page 31 of 31 Operations Summary Report Legal Well Name: L-204 Common Well Name: L-204 Spud Date: 7/16/2006 Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006 Rig Name: NABOBS 9ES Rig Number: Date From -To Hours Task. Code NPT Phase Description of Operations 9/3/2006 14:00 - 15:00 1.00 WHSUR P RUNCMP Maintenance Printed: 9/5/2006 2:49:57 PM by ~~~ ~, ''~. ~ ~~ L-204L1 Survev Re Report Date: 5-Aug-06 Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure /Slot: L-PAD / S-U Well: L-204 Borehole: L-204L1 UWI/API#: 500292331460 Survey Name /Date: L-204L1 /August 5, 2006 Tort /AHD / DDI / ERD ratio: 359.908° / 9583.16 ft / 6.937 / 2.007 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feel Location LaULong: N 70.35026009, W 149.32311435 Location Grid NIE Y/X: N 5978146.730 ftUS, E 583371.740 ftUS Grid Convergence Angle: +0.63747117° Scblumberger Vertical Section Azimuth: 104.910° Vertical Section Origin: N 0.000 ft, E 0.000 ft ND Reference Datum: Rotary Table ND Reference Elevation: 78.60 ft relative to MSL Sea Bed /Ground Level Elevation: 48.75 ft relative to MSL Magnetic Declination: 23.984° Total Field Strength: 57621.179 nT Magnetic Dip: 80.883° Declination Date: August O5, 2006 Magnetic Declination Model: BGGM 2006 North Reference: True North Total Corr Mag North -> True North: +23.984° Local Coordinates Referenced To: Well Head f ~ ~~ Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft n n n n n n de 00 n ftUS nUS Nlt U.UU U.UU U.VU -/tf.bU U.UU U.UU U.UU U.UV V.UU U.VV U.VV by/tfl4b./3 btS:SJ/l. /4 IV /V.JJVZbUVy VV 14`J.JZ.S114Jb GYD GC SS 100.00 0.85 12. 39 21.40 100.00 -0.03 0.74 0.74 0.72 0.16 0.85 5978147.46 583371. 89 N 70.35026207 W 149.32311306 166.00 1.26 13. 33 87.39 165.99 -0.07 1.96 1.96 1.91 0.43 0.62 5978148.64 583372. 15 N 70.35026531 W 149.32311085 261.00 1.00 28. 99 182.37 260.97 0.10 3.82 3.80 3.65 1.07 0.42 5978150.39 583372 .77 N 70.35027006 W 149.32310563 351.00 1.31 131. 89 272.36 350.96 1.21 5.21 4.27 3.65 2.22 2.02 5978150.40 583373. 92 N 70.35027006 W 149.32309632 443.00 4.58 153. 98 364.22 442.82 4.55 9.89 4.63 -0.35 4.62 3.70 5978146.43 583376. 36 N 70.35025912 W 149.32307688 533.00 6.02 158. 29 453.84 532.44 9.72 18.20 11.25 -7.97 7.94 1.66 5978138.85 583379. 77 N 70.35023832 W 149.32304991 626.00 7.28 140. 25 546.22 624.82 17.44 28.88 21.74 -17.03 13.51 2.61 5978129.85 583385 .44 N 70.35021356 W 149.32300467 720.00 8.24 132. 06 639.36 717.96 28.29 41.55 34.36 -26.12 22.32 1.56 5978120.86 583394. 35 N 70.35018873 W 149.32293315 813.00 8.53 135. 67 731.37 809.97 40.15 55.11 47.87 -35.52 32.09 0.65 5978111.57 583404. 22 N 70.35016305 W 149.32285386 Last GYD GC SS 875.00 9.83 127. 28 792.57 871.17 48.99 64.98 57.68 -42.02 39.51 3.00 5978105.16 583411 .71 N 70.35014531 W 149.322 First MWD+IFR+MS 941.45 11.66 111. 02 857.87 936.47 60.92 77.29 69.43 -47.86 50.30 5.30 5978099.43 583422 .56 ; N 70.35012933 W 149.32 1037.16 15.11 111. 81 950.97 1029.57 82.93 99.44 90.34 -55.97 70.91 3.61 5978091.56 583443 .27 N 70.35010719 W 149.322 8 1132.97 19.34 108. 37 1042.46 1121.06 111.17 127.80 117.59 -65.61 97.58 4.54 5978082.21 583470. 03 N 70.35008084 W 149.32232224 1229.64 23.03 106. 69 1132.58 1211.18 146.06 162.73 151.40 -76.09 130.89 3.87 5978072.11 583503 .46 N 70.35005221 W 149.32205178 1324.32 25.69 102. 66 1218.83 1297.43 185.09 201.76 189.28 -85.91 168.67 3.31 5978062.71 583541 .33 N 70.35002538 W 149.32174516 1420.06 30.67 99. 73 1303.20 1381.80 230.18 246.95 233.07 -94.59 213.01 5.40 5978054.52 583585 .77 N 70.35000167 W 149.32138518 1515.04 36.39 97. 47 1382.35 1460.95 282.28 299.39 283.96 -102.36 264.87 6.16 5978047.34 583637. 70 N 70.34998045 W 149.32096422 1610.55 42.03 95. 77 1456.32 1534.92 341.99 359.74 342.70 -109.26 324.82 6.01 5978041.10 583697 .72 N 70.34996159 W 149.32047754 1711.65 40.01 95. 64 1532.60 1611.20 407.49 426.09 407.65 -115.86 390.84 2.00 5978035.24 583763 .81 N 70.34994355 W 149.31994159 1807.00 41.19 96. 35 1604.99 1683.59 468.79 488.14 468.80 -122.34 452.55 1.33 5978029.44 583825 .58 N 70.34992583 W 149.31944065 1902.84 39.77 96. 73 1677.89 1756.49 530.34 550.36 530.39 -129.42 514.36 1.50 5978023.05 583887. 46 N 70.34990647 W 149.31893888 1998.47 41.97 96. 35 1750.20 1828.80 592.25 612.93 592.48 -136.55 576.53 2.32 5978016.62 583949 .69 N 70.34988700 W 149.31843425 SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204L1\L-204L1 Generated 10/2/2006 12:57 PM Page 1 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de n n tt ft n n ft de 100 ft ftUS ttUS LUy4.l4 44.150 y0.V0 1t51 y.by luyo.Ly bb/.G3 0/t5.b/ b0/./b -143.04 b41.i525 3.UL 0y/iSUlV.LS 0t54V15.1L IV /V.34yt50/bV VV 14y.31 /yV3/L 2189.87 47.22 96.54 1886.15 1964.75 725.35 747.57 726.28 -151.20 710.36 2.50 5978003.45 584083.67 N 70.34984693 W 149.31734781 2285.57 50.89 96.76 1948.85 2027.45 796.87 819.84 798.26 -159.58 782.15 3.84 5977995.88 584155. 54 N 70.34982403 W 149.31676507 2381.11 49.73 96.68 2009.87 2088.47 869.64 893.36 871.54 -168.18 855 .16 1.22 5977988.09 584228. 64 N 70.34980051 W 149.31617238 2477.10 50.42 96.89 2071.47 2150.07 942.52 966.97 944.96 -176.88 928 .26 0.74 5977980.21 584301. 82 N 70.34977672 W 149.31557901 2572.36 51.15 96.59 2131.70 2210.30 1015.57 1040.78 1018.59 -185.54 1001 .55 0.80 5977972.36 584375. 20 N 70.34975304 W 149.31498403 2668.18 49.72 96.60 2192.73 2271.33 1088.66 1114.64 1092.30 -194.02 1074 .93 1.49 5977964.70 584448. 66 N 70.34972983 W 149.31438839 2764.00 50.25 96.37 2254.34 2332.94 1161.25 1188.03 1165.54 -202.31 1147 .85 0.58 5977957.22 584521. 66 N 70.34970716 W 149.31379648 2859.46 50.30 96.81 2315.35 2393.95 1233.90 1261.45 1238.84 -210.73 1220 .78 0.36 5977949.61 584594. 68 N 70.34968411 W 149.31320443 2954.76 50.37 96.20 2376.18 2454.78 1306.47 1334.81 1312.08 -219.05 1293 .67 0.50 5977942.11 584667. 64 N 70.34966137 W 149.31261276 3050.79 50.20 96.28 2437.54 2516.14 1379.50 1408.68 1385.83 -227.07 1367 .10 0.19 5977934.90 584741. 15 N 70.34963940 W 149.31 8 3146.15 49.93 96.13 2498.75 2577.35 1451.78 1481.80 1458.84 -234.98 1439 .79 0.31 5977927.81 584813. 92 ~ N 70.34961778 W 149.31 3241.60 50.12 96.26 2560.07 2638.67 1524.08 1554.94 1531.89 -242.87 1512 .51 0.22 5977920.72 584886. 72 N 70.34959617 W 149.31083632 3337.25 50.04 96.54 2621.45 2700.05 1596.63 1628.30 1605.17 -251.05 1585 .41 0.24 5977913.36 584959. 70 N 70.34957379 W 149.31024455 3412.18 49.40 96.45 2669.90 2748.50 1653.18 1685.47 1662.28 -257.51 1642 .21 0.86 5977907.52 585016. 56 N 70.34955609 W 149.30978351 3510.50 49.38 95.86 2733.90 2812.50 1726.95 1760.11 1736.83 -265.52 1716 .42 0.46 5977900.35 585090. 84 N 70.34953418 W 149.30918112 3606.56 48.75 97.03 2796.84 2875.44 1798.72 1832.67 1809.34 -273.66 1788 .53 1.13 5977893.01 585163. 03 N 70.34951190 W 149.30859579 3701.74 49.73 96.79 2858.98 2937.58 1870.11 1904.77 1881.40 -282.33 1860 .10 1.05 5977885.13 585234. 69 N 70.34948816 W 149.30801483 3797.81 51.14 95.12 2920.17 2998.77 1943.26 1978.82 1955.38 -290.00 1933 .75 1.99 5977878.28 585308. 42 N 70.34946715 W 149.30741694 3893.70 50.93 93.93 2980.47 3059.07 2016.60 2053.38 2029.76 -295.89 2008 .07 0.99 5977873.23 585382. 79 N 70.34945102 W 149.30681364 3989.02 50.62 94.78 3040.75 3119.35 2089.19 2127.22 2103.42 -301.49 2081 .70 0.76 5977868.44 585456. 47 N 70.34943565 W 149.30621597 4084.90 50.09 94.60 3101.92 3180.52 2161.84 2201.05 2177.11 -307.53 2155 .28 0.57 5977863.22 585530. 11 N 70.34941910 W 149.30561869 4180.57 49.73 94.27 3163.53 3242.13 2233.81 2274.24 2250.15 -313.19 2228. 25 0.46 5977858.38 585603. 13 N 70.34940358 W 149.30502635 4276.33 49.24 94.88 3225.74 3304.34 2305.43 2347.04 2322.83 -319.00 2300 .82 0.70 5977853.38 585675. 75 N 70.34938766 W 149.30443729 4371.36 49.19 95.48 3287.82 3366.42 2376.35 2418.99 2394.70 -325.49 2372 .48 0.48 5977847.68 585747. 47 N 70.34936985 W 149.30385562 4467.82 48.78 95.70 3351.12 3429.72 2448.17 2491.77 2467.43 -332.58 2444 .92 0.46 5977841.40 585819. 97 N 70.34935042 W 149.30326763 4562.97 50.82 95.77 3412.53 3491.13 2519.91 2564.45 2540.06 -339.84 2517. 22 2.14 5977834.94 585892. 35 N 70.34933052 W 149.30268069 4658.78 51.00 96.65 3472.95 3551.55 2593.42 2638.81 2614.40 -347.89 2591 .15 0.74 5977827.72 585966. 35 N 70.34930847 W 149.30 4754.14 51.01 96.40 3532.95 3611.55 2666.74 2712.92 2688.50 -356.31 2664 .78 0.20 5977820.12 586040. 07 2 N 70.34928539 W 149.301 4849.66 50.93 96.02 3593.10 3671.70 2740.09 2787.12 2762.68 -364.34 2738 .55 0.32 5977812.92 586113. 91 N 70.34926339 W 149.30 4944.97 50.49 96.74 3653.46 3732.06 2813.04 2860.89 2836.43 -372.53 2811 .86 0.74 5977805.54 586187. 30 N 70.34924093 W 149.30028909 5041.18 50.39 96.73 3714.73 3793.33 2886.46 2935.06 2910.59 -381.23 2885 .52 0.10 5977797.66 586261. 05 N 70.34921709 W 149.29969117 5136.35 50.47 97.34 3775.36 3853.96 2959.13 3008.42 2983.95 -390.22 2958 .33 0.50 5977789.48 586333. 95 N 70.34919246 W 149.29910017 5232.61 49.20 96.26 3837.45 3916.05 3031.95 3081.98 3057.50 -398.93 3031 .37 1.57 5977781.58 586407. 07 N 70.34916857 W 149.29850731 5328.23 49.07 96.29 3900.01 3978.61 3103.44 3154.29 3129.80 -406.84 3103 .25 0.14 5977774.48 586479. 03 N 70.34914690 W 149.29792385 5424.12 48.71 96.65 3963.06 4041.66 3174.91 3226.54 3202.04 -414.98 3175 .03 0.47 5977767.14 586550. 89 N 70.34912458 W 149.29734115 5518.74 49.22 97.66 4025.18 4103.78 3245.63 3297.91 3273.41 -423.87 3245 .85 0.97 5977759.04 586621. 80 N 70.34910020 W 149.29676634 5615.31 48.55 96.33 4088.68 4167.28 3317.69 3370.67 3346.16 -432.73 3318 .06 1.25 5977750.98 586694. 09 N 70.34907590 W 149.29618022 5710.48 48.46 95.99 4151.74 4230.34 3388.14 3441.95 3417.42 -440.38 3388 .93 0.28 5977744.12 586765. 04 N 70.34905492 W 149.29560495 5806.66 50.16 96.26 4214.44 4293.04 3460.21 3514.88 3490.33 -448.17 3461 .44 1.78 5977737.14 586837. 62 N 70.34903356 W 149.29501639 5902.52 54.11 97.19 4273.27 4351.87 3535.10 3590.54 3565.99 -457.04 3536 .58 4.19 5977729.10 586912. 85 N 70.34900922 W 149.29440649 SunreyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204L1\L-204L1 Generated 10/2/2006 12:57 PM Page 2 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Nole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de ft n n tt n ft ft de 00 ft ftUS ftUS Tie-In Survey MW D+IFR+MS 5y9t3.U4 5/.1U y(i.5fi 43L/.11 44U5.t31 :iEil3.lt3 3fi(i9.35 3ti44.t3U -4titi./5 :t(i14./y :i.14 5y///"LU.'L/ 5t3(iyyl.lEi N /U.:i4tSytS1(iU W 14y.Ly3//1(iti 6093.30 6188.96 6284.50 6380.10 6475.79 6571.26 6605.15 6691.45 6723.45 6754.80 6789.83 6821.68 6849.89 6881.26 6913.87 6946.09 6978.60 7010.27 7040.00 7073.66 7105.71 7137.76 7169.64 7201.40 7233.65 60 .36 95.81 4376 .66 4455 .26 3693 .68 3750 .76 3726.19 -475 .79 3695 .69 3.57 5977712.13 587072.15 N 70. 34895780 W 149.29311496 64 .30 95.67 4421 .08 4499 .68 3777 .30 3835 .46 3810.86 -484 .25 3779 .97 4.12 5977704.60 587156. 51 N 70. 34893455 W 149.29243087 68 .00 94.93 4459 .70 4538 .30 3863 .44 3922 .83 3898.18 -492 .32 3866 .96 3.94 5977697.51 587243. 58 N 70. 34891240 W 149.29172475 71 .61 95.88 4492 .70 4571 .30 3951 .92 4012 .54 3987.84 -500. 78 3956. 27 3.89 5977690.05 587332. 97 N 70. 34888917 W 149.29099985 75 .92 97.30 4519 .45 4598 .05 4042 .80 4104 .39 4079.68 -511 .33 4047. 51 4.72 5977680.51 587424. 31 N 70. 34886020 W 149.29025926 79.79 100.39 4539.53 4618.13 4135.59 4197.70 4172.95 -525.69 4139.70 5.14 5977667.17 82.11 101.65 4544.86 4623.46 4168.97 4231.17 4206.34 -532.09 4172.55 7.77 5977661 .14 83.29 99.14 4555.83 4634.43 4254.30 4316.77 4291.81 -547.53 4256.74 3.19 5977646 .64 85.22 103.21 4559.04 4637.64 4286.06 4348.61 4323.57 -553.70 4287.97 14.02 5977640 .82 89.27 104.77 4560.54 4639.14 4317.37 4379.91 4354.67 -561.27 4318.34 13.84 5977633 .59 89.71 107.94 4560.85 4639.45 89.66 109.85 4561.03 4639.63 89.50 110.09 4561.24 4639.84 89.50 109.90 4561.51 4640.11 89.80 110.56 4561.71 4640.31 89.75 110.46 4561.84 4640.44 89.65 110.23 4562.01 4640.61 89.59 110.35 4562.22 4640.82 86.39 112.68 4563.26 4641.86 86.48 115.25 4565.35 4643.95 87.16 117.73 4567.13 4645.73 86.90 120.28 4568.79 4647.39 86.64 120.24 4570.59 4649.19 86.14 119.72 4572.59 4651.19 87.87 120.63 4574.27 4652.87 7264.98 89.77 117.99 4574. 92 4653.52 7296.71 90.39 116.26 4574. 87 4653.47 7329.02 89.57 112.43 4574. 88 4653.48 7361.51 87.35 11 i .15 4575. 76 4654.36 7393.08 86.68 111.40 4577. 40 4656.00 7424.56 86.45 111.40 4579. 29 4657.89 7456.78 86.40 112.13 4581. 30 4659.90 7488.90 86.09 111.12 4583. 40 4662.00 7520.74 86.97 113.51 4585. 33 4663.93 7551.98 86.90 114.40 4587. 00 4665.60 4352.38 4384.15 4412.25 4443.49 4475.96 4508.03 4540.39 4571.92 4601.43 4634.60 4665.95 4696.99 4727.69 4758.29 4789.36 4819.70 4850.71 4882.57 4914.81 4946.15 4977.37 5009.30 5041.13 5072.64 5103.45 7583.94 86.98 113. 97 4588.70 4667. 30 5134.95 7615.97 86.89 113. 88. 4590.42 4669. 02 5166.53 7647.77 86.46 114. 05 4592.26 4670. 86 5197.89 7679.88 85.85 113. 33 4594.41 4673. 01 5229.55 7711.54 87.60 114. 47 4596.22 4674. 82 5260.77 4414.94 4446.79 4475.00 4506.37 4538.98 4571.20 4603.71 4635.38 4665.08 4698.68 4730.68 4762.69 4794.52 4826.21 4858.42 4889.74 4921.47 4953.78 4986.26 5017.78 5049.21 5081.36 5113.41 5145.20 5176.39 5208.30 5240.29 5272.04 5304.07 5335.68 4389.27 4420.49 4448.04 4478.69 4510.53 4541.97 4573.72 4604.67 4633.56 4665.90 4696.30 4726.27 4755.85 4785.39 4815.40 4844.77 4874.95 4906.14 4937.85 4968.70 4999.45 5030,88 5062.23 5093.25 5123.49 5154.42 5185.46 5216.27 5247.42 5278.13 -571.14 -581.45 -591.08 -601.81 -613.08 -624.37 -635.68 -646.66 -657.55 -671.20 -685.47 -700.99 -717.03 -732.87 -749.05 -764.39 -778.85 -792.17 -804.22 -815.66 -827.13 -839.05 -850.86 -862.93 -875.60 -888.67 -901.64 -914.54 -927.41 -940.21 4351.95 4382.08 4408.60 4438.07 4468.67 4498.85 4529.33 4559.03 4586.67 4617.37 4646.00 4673.99 4701.49 4728.94 4756.78 4784.09 4812.33 4841.76 4871.92 4901.30 4930.55 4960.42 4990.21 5019.61 5048.12 5077.23 5106.47 5135.48 5164.82 5193.71 9.14 5977624.10 6.00 5977614.12 1.02 5977604.78 0.61 5977594.39 2.22 5977583.45 0.35 5977572.50 0.77 5977561.54 0.42 5977550.89 13.31 5977540.31 7.63 5977527.00 8.01 5977513.05 7.99 5977497.85 0.83 5977482.12 2.27 5977466.59 6.06 5977450.71 10.38 5977435.69 5.79 5977421.54 12.12 5977408.55 7.89 5977396.83 2.26 5977385.72 0.73 5977374.58 2.27 5977362.99 3.28 5977351.51 7.99 5977339.78 2.85 5977327.43 1.37 5977314.68 0.40 5977302.04 1.45 5977289.47 2.94 5977276.92 6.59 5977264.44 587516.65 587549.56 587633.91 587665.20 587695.65 587729.37 587759.61 587786.22 587815.82 587846.53 N 70.34882082 W 149.28951098 N 70.34880329 W 149.28924437 N 70.34876098 W 149.28856106 N 70.34874407 W 149.28830761 N 70.34872335 W 149.28 6 N 70.34869635 W 149.28 1 N 70.34866813 W 149.28754377 N 70.34864177 W 149.28732860 N 70.34861242 W 149.28708938 N 70.34858156 W 149.28684106 587876.83 N 70.34855067 W 149.28659616 587907.43 N 70.34851974 W 149.28634879 587937.26 N 70.34848969 W 149.28610773 587965.01 N 70.34845989 W 149.28588346 587995.85 N 70.34842256 W 149.28563436 588024.65 588052.80 588080.47 588108.10 588136.11 588163.59 588191.99 588221.56 588251.85 588281.35 588310.73 588340.72 588370.64 588400.17 588428.81 588458.07 588487.44 588516.59 588546.07 588575.10 N 70.34838352 W 149.28540197 N 70.34834108 W 149.28517484 N 70.34829721 W 149.28495176 N 70.34825389 W 149.28472898 N 70.34820962 W 149.28450308 N 70.34816769 W 149.28428149 N 70.34812812 W 149.284 N 70.34809169 W 149.28 N 70.34805870 W 149.28 1 N 70.34802740 W 149.28333041 N 70.34799602 W 149.28309299 N 70.34796340 W 149.28285064 N 70.34793107 W 149.28260886 N 70.34789805 W 149.28237029 N 70.34786340 W 149.28213897 N 70.34782763 W 149.28190273 N 70.34779214 W 149.28166549 N 70.34775686 W 149.28143010 N 70.34772164 W 149.28119204 N 70.34768660 W 149.28095756 SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204L1\L-204L1 Generated 10/2/2006 12:57 PM Page 3 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure n de de n ft ft n n n n de oo n nUS nUS 7742.95 87.90 115.07 4597.46 4676.06 5291.69 5367.07 5308.52 -953.36 5222.21 2.13 5977251.61 588603. 74 N 70.34765062 W 149.28072632 7774.53 87.51 114.76 4598.72 4677.32 5322.76 5398.62 5339.07 -966.66 5250.83 1.58 5977238.64 588632. 50 N 70.34761425 W 149.28049411 7806.87 87.28 114.45 4600.19 4678.79 5354.61 5430.93 5370.40 -980.11 5280.20 1.19 5977225.52 588662. 02 N 70.34757745 W 149.28025577 7838.37 86.97 114.84 4601.77 4680.37 5385.61 5462.39 5400.91 -993.23 5308.80 1.58 5977212.72 588690. 76 N 70.34754155 W 149.28002375 7870.52 86.55 114.94 4603.59 4682.19 5417.23 5494.49 5432.02 -1006.74 5337.91 1.34 5977199.53 588720. 02 N 70.34750459 W 149.27978749 7901.91 86.48 114.65 4605.50 4684.10 5448.09 5525.82 5462.41 -1019.88 5366.36 0.95 5977186.71 588748. 61 N 70.34746864 W 149.27955669 7934.29 88.71 115.01 4606.85 4685.45 5479.96 5558.17 5493.80 -1033.46 5395.72 6.98 5977173.46 588778. 11 N 70.34743147 W 149.27931847 7966.67 90.60 112.66 4607.05 4685.65 5511.94 5590.55 5525.35 -1046.54 5425.33 9.31 5977160.70 588807. 87 N 70.34739567 W 149.27907817 7998.02 91.04 114.25 4606.60 4685.20 5542.94 5621.89 5555.95 -1059.02 5454.09 5.26 5977148.55 588836. 76 N 70.34736153 W 149.27884484 8029.32 92.12 112.77 4605.74 4684.34 5573.88 5653.18 5586.50 -1071.50 5482.78 5.85 5977136.39 588865. 58 N 70.34732737 W 149.27861205 8061.22 92.05 112.69 4604.58 4683.18 5605.46 5685.06 5617.72 -1083.82 5512.18 0.33 5977124.40 588895. 12 N 70.34729366 W 149.27 8093.19 91.36 111.67 4603.63 4682.23 5637.16 5717.01 5649.09 -1095.88 5541.77 3.85 5977112.67 588924. 84 N 70.34726065 W 149.278 6 8125.52 91.47 110.38 4602.83 4681.43 5669.29 5749.33 5680.93 -1107.48 5571.94 4.00 5977101.41 588955. 13 N 70.34722891 W 149.27788857 8157.13 91.48 109.48 4602.01 4680.61 5700.77 5780.93 5712.17 -1118.25 5601.64 2.85 5977090.97 588984. 95 N 70.34719942 W 149.27764751 8188.76 91.02 109.18 4601.32 4679.92 5732.30 5812.56 5743.48 -1128.72 5631.48 1.74 5977080.84 589014. 90 N 70.34717077 W 149.27740538 8220.52 90.52 108.57 4600.90 4679.50 5763.98 5844.31 5774.97 -1138.99 5661.53 2.48 5977070.90 589045. 06 N 70.34714264 W 149.27716154 8252.59 90.45 109.20 4600.63 4679.23 5795.97 5876.38 5806.76 -1149.37 5691.88 1.98 5977060.86 589075. 51 N 70.34711422 W 149.27691533 8283.79 90.90 109.20 4600.26 4678.86 5827.08 5907.58 5837.67 -1159.63 5721.34 1.44 5977050.93 589105. 09 N 70.34708613 W 149.27667625 8316.02 90.99 109.17 4599.73 4678.33 5859.22 5939.81 5869.61 -1170.22 5751.77 0.29 5977040.68 589135. 63 N 70.34705713 W 149.27642928 8348.02 90.98 108.56 4599.18 4677.78 5891.14 5971.80 5901.34 -1180.56 5782.05 1.91 5977030.67 589166. 02 N 70.34702881 W 149.27618361 8379.93 91.23 109.58 4598.56 4677.16 5922.96 6003.70 5932.97 -1190.99 5812.20 3.29 5977020.59 589196. 29 N 70.34700027 W 149.27593893 8411.07 90.93 108.89 4597.97 4676.57 5954.00 6034.84 5963.83 -1201.25 5841.60 2.42 5977010.66 589225. 79 N 70.34697218 W 149.27570040 8442.96 91.25 109.12 4597.37 4675.97 5985.80 6066.72 5995.45 -1211.63 5871.75 1.24 5977000.61 589256. 05 N 70.34694375 W 149.27545578 8474.74 90.99 108.72 4596.75 4675.35 6017.50 6098.50 6026.97 -1221.93 5901.80 1.50 5976990.65 589286. 22 N 70.34691554 W 149.27521188 8506.77 90.55 108.86 4596.32 4674.92 6049.45 6130.52 6058.75 -1232.25 5932.12 1.44 5976980.67 589316. 65 N 70.34688730 W 149.27496586 8539.31 90.66 109.92 4595.97 4674.57 6081.89 6163.06 6091.00 -1243.05 5962.81 3.27 5976970.21 589347. 45 N 70.34685772 W 149.27471681 8570.93 91.18 109.90 4595.46 4674.06 6113.39 6194.68 6122.30 -1253.82 5992.54 1.65 5976959.78 589377. 29 N 70.34682824 W 149.27447561 8602.25 91.30 110.04 4594.79 4673.39 6144.58 6225.99 6153.30 -1264.51 6021.97 0.59 5976949.41 589406. 84 N 70.34679896 W 149.27423 81 8634.37 91.54 108.73 4593.99 4672.59 6176.59 6258.10 6185.14 -1275.17 6052.26 4.15 5976939.09 589437. 24 N 70.34676978 W 149.273 8665.79 91.29 108.77 4593.21 4671.81 6207.93 6289.51 6216.32 -1285.26 6082.00 0.81 5976929.33 589467. 09 N 70.34674213 W 149.273 8697.79 90.85 106.25 4592.62 4671.22 6239.89 6321.51 6248.16 -1294.89 6112.51 7.99 5976920.04 589497. 70 N 70.34671577 W 149.27350212 8729.57 89.59 102.86 4592.49 4671.09 6271.66 6353.29 6279.91 •1302.87 6143.27 11.38 5976912.40 589528. 54 N 70.34669388 W 149.27325255 8760.87 87.12 100.26 4593.39 4671.99 6302.89 6384.57 6311.19 -1309.14 6173.92 11.45 5976906.47 589559. 26 N 70.34667669 W 149.27300385 8792.51 84.61 98.82 4595.67 4674.27 6334.31 6416.12 6342.71 -1314.37 6205.03 9.14 5976901.59 589590. 43 N 70.34666233 W 149.27275132 8824.56 84.14 98.51 4598.82 4677.42 6366.01 6448.02 6374.56 -1319.18 6236.56 1.75 5976897.14 589622. 01 N 70.34664913 W 149.27249543 8856.79 83.65 97.84 4602.24 4680.84 6397.84 6480.07 6406.53 -1323.74 6268.29 2.57 5976892.93 589653. 77 N 70.34663661 W 149.27223799 8888.11 84.57 99.25 4605.46 4684.06 6428.80 6511.22 6437.63 -1328.37 6299.09 5.36 5976888.65 589684: 63 N 70.34662389 W 149.27198797 8920.39 84.78 100.60 4608.45 4687.05 6460.82 6543.36 6469.75 -1333.91 6330.75 4.21 5976883.46 589716. 34 N 70.34660868 W 149.27173105 8952.13 85.04 101.23 4611.27 4689.87 6492.36 6574.98 6501.36 -1339.89 6361.79 2.14 5976877.82 589747. 45 N 70.34659226 W 149.27147914 8983.76 84.99 102.95 4614.02 4692.62 6523.83 6606.49 6532.87 -1346.49 6392.60 5.42 5976871.56 589778. 33 N 70.34657416 W 149.27122911 SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204L1\L-204L1 Generated 10/2/2006 12:57 PM Page 4 of 7 Comments Measured Inclination Azimuth Subsea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de n n n n it n tt de 100 ft ftUS ftUS yUlb.4E~ ti4.LC lU'L.U:S 4171/.UU 4byb.bU bbbb.:ib bt)3tf.U5 b5b4.43 -1;S~;S.:S'L b4'L:i.4L J.// 5y/btSbb.Utf 9047.80 86.11 102.11 4619.72 4698.32 6587.54 6670.27 6596.65 -1360.05 6454.93 5.85 5976858.70 9079.37 86.71 101.90 4621.70 4700.30 6619.01 6701.78 6628.16 -1366.61 6485.75 2.01 5976852.49 9111.36 86.35 101.02 4623.64 4702.24 6650.88 6733.71 6660.09 -1372.95 6517.04 2.97 5976846.49 9143.52 86.01 100.85 4625.78 4704.38 6682.89 6765.80 6692.18 -1379.04 6548.55 1.18 5976840.76 9176.06 86.43 102.36 4627.93 4706.53 6715.31 6798.27 6724.64 -1385.57 6580.35 4.81 5976834.58 9207.89 86.22 102.52 4629.97 4708.57 6747.04 6830.03 6756.41 -1392.41 6611.37 0.83 5976828.08 9238.88 85.93 101.32 4632.09 4710.69 6777.92 6860.95 6787.32 -1398.80 6641.62 3.97 5976822.03 9270.62 84.88 103.64 4634.63 4713.23 6809.53 6892.59 6818.96 -1405.64 6672.51 8.00 5976815.54 9302.75 84.37 106.52 4637.64 4716.24 6841.51 6924.58 6850.89 -1413.96 6703.39 9.06 5976807.57 9334.89 84.39 108.01 4640.79 4719.39 6873.47 6956.56 6882.74 -1423.45 6733.94 4.61 5976798.42 9365.98 84.52 108.12 4643.79 4722.39 6904.37 6987.51 6913.51 -1433.05 6763.36 0.55 5976789.15 9398.84 85.01 107.74 4646.79 4725.39 6937.04 7020.23 6946.05 -1443.12 6794.49 1.88 5976779.42 9430.31 84.99 107.54 4649.53 4728.13 6968.36 7051.58 6977.25 -1452.62 6824.36 0.64 5976770.26 9461.75 85.85 110.37 4652.04 4730.64 6999.62 7082.92 7008.36 -1462.80 6854.00 9.38 5976760.41 9493.96 88.61 114.82 4653.60 4732.20 7031.49 7115.09 7039.98 -1475.16 6883.69 16.24 5976748.38 9526.10 89.14 114.94 4654.23 4732.83 7063.14 7147.22 7071.32 -1488.68 6912.84 1.69 5976735.19 9558.25 89.23 115.76 4654.69 4733.29 7094.75 7179.37 7102.62 -1502.44 6941.90 2.57 5976721.75 9589.38 89.47 115.41 4655.04 4733.64 7125.34 7210.49 7132.91 -1515.88 6969.97 1.36 5976708.62 9621.92 89.10 115.22 4655.45 4734.05 7157.34 7243.03 7164.61 -1529.79 6999.38 1.28 5976695.04 9653.38 87.71 115.72 4656.32 4734.92 7188.26 7274.48 7195.24 -1543.32 7027 .77 4.70 5976681.83 9685.23 87.57 116.63 4657.64 4736.24 7219.47 7306.30 7226.15 -1557.36 7056. 33 2.89 5976668.12 9717.35 86.97 113.63 4659.17 4737.77 7251.04 7338.39 7257.45 -1570.98 7085 .38 9.51 5976654.82 9748.29 87.07 113.74 4660.78 4739.38 7281.57 7369.28 7287.76 -1583.39 7113 .67 0.48 5976642.72 9780.76 89.34 115.75 4661.79 4740.39 7313.55 7401.74 7319.48 -1596.97 7143 .14 9.34 5976629.47 9813.09 91.42 118.73 4661.58 4740.18 7345.12 7434.06 7350.76 -1611.77 7171. 88 11.24 5976615.00 9844.63 90.81 123.02 4660.96 4739.56 7375.43 7465.60 7380.72 -1627.95 7198 .94 13.74 5976599.12 9876.30 90.02 123.61 4660.73 4739.33 7405.48 7497.27 7410.37 -1645.34 7225 .41 3.11 5976582.03 9908.29 90.38 124.01 4660.62 4739.22 7435.75 7529.26 7440.25 -1663.14 7251 .99 1.68 5976564.52 9940.54 90.69 122.76 4660.32 4738.92 7466.33 7561.50 7470.47 -1680.89 7278 .91 3.99 5976547.08 9972.39 90.80 123.16 4659.91 4738. 51 7496.61 7593.35 10004,37 91.35 123.51 4659.31 4737. 91 7526.95 7625.33 1003525 91.55 123.14 4658.53 4737. 13 7556.24 7656.20 10067,52 91.40 123.68 4657.70 4736. 30 7586.83 7688.46 10099.95 91.07 123.22 4657.00 4735. 60 7617.57 7720.88 10131.65 91.21 122.81 4656.37 4734. 97 7647.70 7752.57 10162.88 90.85 122.82 4655.80 4734. 40 7677.41 7783.80 10195.04 90.59 123.29 4655.40 4734. 00 7707.97 7815.95 10227.07 92.63 123.91 4654.50 4733. 10 773829 7847.97 10259.47 92.90 122.52 4652.94 4731. 54 7769.02 7880.33 10290.54 93.35 124.32 4651.24 4729. 84 7798.43 7911.36 7500.41 -1698.21 7530.42 -1715.78 7559.41 -1732.74 7589.70 -1750.51 7620.15 -1768.38 7650.02 -1785.65 7679.49 -1802.57 7709.82 -1820.11 7739.92 -1837.83 7770.43 -1855.55 7305.63 1.30 5976530.05 7332.35 2.04 5976512.78 7358.14 1.36 5976496.11 7385.07 1.74 5976478.65 7412.12 1.75 5976461.08 7799.67 -1872.64 SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204L1\L-204L1 bifytSUy.LI N /U.J4b55544 W 14y.'L/U5/yUtf 589840.79 N 70.34653696 W 149.27072337 589871.68 N 70.34651898 W 149.27047327 589903.04 N 70.34650158 W 149.27021932 589934.61 N 70.34648487 W 149.26996365 589966.48 N 70.34646695 W 149.26970556 589997.57 N 70.34644818 W 149.26945385 590027.89 N 70.34643067 W 149.26920837 590058.84 N 70.34641192 W 149.26895772 590089.82 N 70.34638911 W 149.26870712 590120.46 N 70.34636310 W 149.268 9 590149.98 N 70.34633681 W 149.26 590181.22 N 70.34630921 W 149.267 6 590211.20 N 70.34628319 W 149.26772555 590240.95 N 70.34625530 W 149.26748508 590270.77 N 70.34622147 W 149.26724419 590300.07 N 70.34618446 W 149.26700769 590329.27 N 70.34614679 W 149.26677200 590357.49 N 70.34610999 W 149.26654423 590387.05 N 70.34607191 W 149.26630562 590415.59 N 70.34603489 W 149.26607529 590444.30 N 70.34599647 W 149.26584360 590473.49 N 70.34595918 W 149.26560799 590501.92 N 70.34592520 W 149.26537844 590531.53 N 70.34588801 W 149.26513935 590560.43 590587.67 590614.32 590641.10 590668.22 590695.13 590722.03 590748.01 590775.13 590802.38 N 70.34584752 W 149.26490622 N 70.34580325 W 149.26468673 N 70.34575566 W 149.26447208 N 70.34570696 W 149.264 N 70.34565841 W 149.26 N 70.34561101 W 149.26382136 N 70.34556293 W 149.26360469 N 70.34551653 W 149.26339548 N 70.34546794 W 149.26317707 N 70.34541904 W 149.26295765 7438.70 1.37 5976444.11 590829.14 N 70.34537179 W 149.26274210 7464.94 1.15 5976427.49 590855.57 N 70.34532549 W 149.26252926 7491.89 1.67 5976410.25 590882.71 N 70.34527750 W 149.26231066 7518.56 6.66 5976392.83 590909.57 N 70.34522903 W 149.26209438 7545.63 4.37 5976375.41 590936.84 N 70.34518052 W 149.26187479 7571.53 5.96 5976358.61 590962.92 N 70.34513377 W 149.26166479 Generated 10/2/2006 12:57 PM Page 5 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de n tt ft it ft n n de 00 ft ftUS ftUS lU3L'L.54 yl.tSti 1"G3.Ut5 41i4`J./y 4/'Ltf. :iy /tS[tf./U /y4:i.~'L /tS'Cy./b -1iSyU.:i/ /5yt5.1G ti.Uli b`J/t)J41.lii byUytSy./U N /U.:i45UribL5 W 14y.1(i144y1U 10354.57 89.38 121.78 4649.44 4728. 04 7859.24 7975.35 7860.13 -1907.55 7625.15 8.74 5976324.31 591016.92 N 70.34503826 W 149.26122986 10386.25 86.08 120.56 4650.70 4729. 30 7889.62 8007.00 7890.38 -1923.93 7652.23 11.10 5976308.23 591044.18 N 70.34499343 W 149.26101022 10418.11 84.78 120.83 4653.24 4731. 84 7920.18 8038.76 7920.83 -1940.14 7679.54 4.17 5976292.32 591071.67 N 70.34494906 W 149.26078872 10450.51 84.88 119.65 4656.16 4734. 76 7951.30 8071.02 7951.84 -1956.39 7707.42 3.64 5976276.39 591099.72 N 70.34490459 W 149.26056262 10482.26 84.99 120.17 4658.96 4737. 56 7981.85 8102.65 7982.29 -1972.16 7734.83 1.67 5976260.92 591127.30 N 70.34486143 W 149.26034026 10514.04 84.85 121.91 4661.77 4740. 37 8012.26 8134.31 8012.61 -1988.48 7761.95 5.47 5976244.91 591154.60 N 70.34481676 W 149.26012029 10546.00 84.79 121.92 4664.66 4743. 26 8042.69 8166.13 8042.97 -2005.31 7788.97 0.19 5976228.38 591181.80 N 70.34477072 W 149.25990116 10577.76 84.32 121.85 4667.67 4746. 27 8072.93 8197.75 8073.13 -2022.01 7815.82 1.50 5976211.98 591208.83 N 70.34472502 W 149.25968343 10609.63 83.80 121.65 4670.97 4749.57 8103.27 8229.45 8103.41 -2038.69 7842.77 1.75 5976195.60 591235. 97 N 70.34467937 W 149.25946481 10641.13 83.51 121.24 4674.45 4753.05 8133.28 8260.76 8133.38 -2055.02 7869.48 1.59 5976179.57 591262. 85 N 70.34463468 W 149.259 9 10673.09 84.21 124.78 4677.87 4756.47 8163.48 8292.53 8163.54 -2072.33 7896.12 11.23 5976162.56 591289. 68 N 70.34458731 W 149.25 10705.35 85.15 126.84 4680.86 4759.46 8193.49 8324.65 8193.51 -2091.13 7922.17 6.99 5976144.06 591315. 94 N 70.34453590 W 149.258 9 10737.26 84.95 125.27 4683.62 4762.22 8223.14 8356.44 8223.14 -2109.84 7947.87 4.94 5976125.64 591341. 84 N 70.34448471 W 149.25861247 10768.91 84.52 126.45 4686.52 4765.12 8252.57 8387.96 8252.57 -2128.30 7973.41 3.95 5976107.46 591367. 59 N 70.34443420 W 149.25840534 10800.93 83.85 125.67 4689.76 4768.36 8282.28 8419.82 8282.30 -2147.05 7999.16 3.20 5976089.00 591393. 54 N 70.34438290 W 149.25819652 10833.90 84.96 126.87 4692.98 4771.58 8312.84 8452.63 8312.89 -2166.46 8025.62 4.95 5976069.89 591420. 21 N 70.34432979 W 149.25798199 10864.80 87.42 125.01 4695.03 4773.63 8341.61 8483.46 8341.71 -2184.55 8050.58 9.97 5976052.08 591445. 36 N 70.34428029 W 149.25777959 10896.27 89.47 122.46 4695.89 4774.49 8371.38 8514.91 8371.53 -2202.02 8076.73 10.39 5976034.90 591471. 71 N 70.34423249 W 149.25756746 10928.29 91:32 121.50 4695.67 4774.27 8401.99 8546.93 840220 -2218.98 8103.89 6.51 5976018.25 591499. 05 N 70.34418608 W 149.25734721 10961.07 91.66 117.46 4694.81 4773.41 8433.70 8579.70 8433.97 -2235.10 8132.41 12.36 5976002.45 591527. 75 N 70.34414195 W 149.25711589 10992.42 90.66 113.81 4694.18 4772.78 8464.49 8611.04 8464.81 -2248.66 8160.67 12.07 5975989.21 591556. 15 N 70.34410483 W 149.25688672 11024.71 91.57 111.20 4693.55 4772.15 8496.49 8643.33 8496.84 -2261.02 8190.49 8.56 5975977.18 591586. 10 N 70.34407099 W 149.25664481 11056.09 92.70 109.82 4692.38 4770.98 8527.70 8674.69 8528.08 -2272.00 8219.86 5.68 5975966.52 591615. 59 N 70.34404088 W 149.25640656 11088.07 92.35 109.07 4690.97 4769.57 8559.54 8706.64 8559.95 -2282.64 8249.99 2.59 5975956.23 591645. 83 N 70.34401174 W 149.25616217 11119.97 92.40 108.81 4689.65 4768.25 8591.34 8738.51 8591.76 -2292.98 8280.13 0.83 5975946.22 591676. 09 N 70.34398339 W 149.25591761 11151.54 91.82 105.95 4688.49 4767.09 8622.85 8770.06 8623.29 -2302.41 8310.24 9.24 5975937.13 591706. 29 N 70.34395755 W 149.25567338 11182.65 91.77 102.95 4687.51 4766.11 8653.94 8801.15 8654.38 -2310.17 8340.34 9.64 5975929.71 591736. 48 N 70.34393627 W 149.25542911 11215.40 91.55 104.59 4686.56 4765.16 8686.67 8833.89 8687.10 -2317.96 8372.14 5.05 5975922.27 591768. 36 N 70.34391488 W 149.25517 16 11247.33 91.34 104.69 4685.76 4764.36 8718.59 8865.81 8719.01 -2326.02 8403.02 0.73 5975914.55 591799. 33 N 70.34389275 W 149.254 11278.98 90.88 104.45 4685.14 4763.74 8750.24 8897.45 8750.65 -2333.98 8433.65 1.64 5975906.93 591830. 04 N 70.34387091 W 149.25467213 11311.21 90.29 104.56 4684.82 4763.42 8782.46 8929.68 8782.88 -2342.06 8464.85 1.86 5975899.21 591861. 32 N 70.34384876 W 149.25441900 11342.97 90.74 104.35 4684.53 4763.13 8814.22 8961.44 8814.63 -2349.98 8495.60 1.56 5975891.62 591892. 16 N 70.34382701 W 149.25416950 11375.14 90.59 104.33 4684.16 4762.76 8846.39 8993.61 8846.79 -2357.95 8526.77 0.47 5975884.00 591923. 41 N 70.34380515 W 149.25391665 11406.98 89.93 104.41 4684.01 4762.61 887823 9025.45 8878.63 -2365.85 8557.61 2.09 5975876.45 591954. 34 N 70.34378346 W 149.25366642 11439.22 91.70 104.68 4683.55 4762.15 8910.46 9057.68 8910.86 -2373.95 8588.81 5.55 5975868.70 591985. 62 N 70.34376125 W 149.25341328 11470.83 91.14 104.98 4682.77 4761.37 8942.06 9089.28 8942.45 -2382.04 8619.36 2.01 5975860.95 592016. 26 N 70.34373906 W 149.25316545 11502.47 90.90 104.42 4682.21 4760.81 8973.69 9120.92 8974.09 -2390.06 8649.96 1.93 5975853.27 592046. 94 N 70.34371703 W 149.25291721 11534.75 92.13 105.40 4681.35 4759.95 9005.96 9153.18 9006.35 -2398.37 8681.14 4.87 5975845.31 592078. 21 N 70.34369425 W 149.25266424 11566.20 92.32 104.94 4680.13 4758.73 9037.39 9184.61 9037.78 -2406.59 8711.47 1.58 5975837.43 592108. 63 N 70.34367169 W 149.25241817 11598.83 89.95 103.67 4679.49 4758.09 9070.01 9217.23 9070.39 -2414.65 8743.08 8.24 5975829.72 592140. 32 N 70.34364957 W 149.25216173 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) S-U\L-204\L-2O4L1\L-2O4L1 Generated 10/2/2006 12:57 PM Page 6 of 7 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft tt ft ft ft ft ft de 100 ft ftUS ftUS 11 bGL~.`.i`J i5b.by lUl.b25 4btSU.4U 4/Sy.VV yl Vl.1L yC4C.3/ yl Vl.bV -L4Ll.4b C//J.4/ 1L.43 by/btSC:S.LS 11661.75 86.36 101.87 4682.33 4760.93 9132.77 9280.08 9133.13 -2427.90 8804.51 1.38 5975817.16 11694.25 86.87 101.45 4684.24 4762.84 9165.17 9312.52 9165.51 -2434.46 8836.28 2.03 5975810.95 11726.21 88.78 103.79 4685.46 4764.06 9197.07 9344.45 9197.40 -2441.43 8867.45 9.45 5975804.32 11757.86 88.77 103.92 4686.13 4764.73 9228.71 9376.10 9229.03 -2449.01 8898.17 0.41 5975797.09 11789.53 88.60 104.04 4686.86 4765.46 9260.37 9407.76 9260.69 -2456.66 8928.89 0.66 5975789.78 11821.68 88.15 102.57 4687.77 4766.37 9292.49 9439.89 9292.80 -2464.06 8960.16 4.78 5975782.74 11853.02 87.70 102.74 4688.91 4767.51 9323.79 9471.21 9324.08 -2470.92 8990.72 1.53 5975776.22 11885.36 88.99 104.51 4689.84 4768.44 9356.10 9503.54 9356.39 -2478.53 9022.14 6.77 5975768.95 Last MWD+IFR+MS 11916.75 88.78 103.06 4690.45 .4769.05 9387.48 9534.92 9387.76 -2486.01 9052.62 4.67 5975761.82 TD (Projected) 11965.00 88.78 103.06 4691.48 4770.08 9435.69 9583.16 9435.97 -2496.91 9099.61 0.00 5975751.44 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata - gyro single shots -- Gyrodata gy ro orientation surveys. Not to be run above 70 degrees inc lination. ) MWD +IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Description: Northing (Y) [ftUS] Easting (X) [ftUS] Surface : 2423 FSL 3544 FEL S34 T12N Ri 1 E UM 5978146.73 583371.74 BHL : 5200 FSL 5009 FEL S1 T1 1 N R11 E UM 5975751.44 592497.71 5yY7/U./t5 IV /U.:S4Jb3VtSC VV 74y.Lblyl Oly 592201.89 N 70.34361318 W 149.25166335 592233.73 N 70.34359516 W 149.25140556 592264.96 N 70.34357600 W 149.25115274 592295.76 N 70.34355520 W 149.25090350 592326.57 N 70.34353420 W 149.25065424 592357.92 N 70.34351390 W 149.25040053 592388.55 N 70.34349505 W 149.25015260 592420.04 N 70.34347415 W 149.24989773 592450.60 N 70.34345362 W 149.24965046 592497.71 N 70.34342368 W 149.2493 • SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204L1\L-204L1 Generated 10/2/2006 12:57 PM Page 7 of 7 TREE = FMC 4118" 5M WELLHEAD = FMC GEN ACTUATOR = LE KB. ELEV = 78. BF. ELEV = 50.1' KOP = 7 Max A le= 95 6583' Datum MD = 6142 Datum TVD = 4478' SS ~ 2~, L-204 L-204 L2 L-204 L3 L- 04 L4 110-3l4" CSG. 45.5 L-80, ID = 9.95" I 109' 3457' ( I 5"PHOENIX DSCHRGE-PRESS SUB,ID = 3.948" 1-i 5758' 4.5' PHNIX MULTI-PRESS SENSOR, ID = 3.994" 5790' RA TAG I'1 5881' 7-518" x 5.5" BKR ZXP PACKER, ID = 4.95" 5878' Seal Assembly from LEM#3 6035' L4 BKR HUGHES HOOK HGR, ID = 5.63" 5925' Minimum ID = 3,688" @ 5925', 6059' & 6165' - LEM's RA TAG ~"1 bU"I S' 7-818" x 5.5" BKR ZXP PACKER, ID = 4.82" 6003' Seal Assembly from LEM#2 6022' L3 BKR HUGHES HOOK HGR, 10 = 5.62" 6059' RA TAG 1-i 6115' 7-518" x 5.5" BKR ZXP PACKER, ID = 4.82" 6108' Seal Assembly from LEM#1 6127' L2 BKR HUGHES HOOK HGR, ID = 5.62" 6165' 7-5/8° x 5.5" BKR ZXP PKR wl10.74' TIEBACK 6229' 7-518" x 5.5" BKR HMC HANGER, 10 = 4.81" 6250' RA TAG 6380' 7-5l8" CSG. 29.7 L-80, ID = 6.875" 6670' 4" x 6.4" Sw~eli Packer 3.9" I 7123'-7133' 4.5" 12.6# L-80 BTC Slotted (3.958" ID 7233'41411' 4" x 6.4" Swell Packer 3.9" ID 9431'J~ 441' 4" x 6.4" Swell Packer 3.9" I 9850'860' 4.5" 12.6# L-80 BTC Slotted (3.958" ID 9875-17923 4.5" 12.6# L-80 BTGIBT Slotted/Sdid Liner Shoe (11969' PBTD) - L1 - OBd 11965 NOTES: FR DRLG -DRAFT 2191' 4-1l2" HES X NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3011 2491 50 KBG-2 DMY SBK 0 09/01/06 3 4590 3508 51 KBG-2 DMY SBK 0 09(01!06 2 5538 4116 49 KBG-2 DMY SBK 0 09!01!06 1 5648 4189 49 KBG-2 DCK2 BEK 0 09101106 5769' 4.5" Baker CMO-BX Sliding Slee~,e, 3.812" ID 5812' 7.625" x 4.5" Premier Packer 3.87" ID 5839' 4.5" HES X nipple W! RHGM Plug, ID 3.813" 5860' 4.5" HES X nipple, ID 3.813" 5886' 4.5" Guide Shoe J-------~~---~ 5925'- 5948' H Hookwall Hanger below window - 3.99" ID-L4 OA 5984'- 5974' H 4" x 6.4" Swell Packer 3.9" ID-L4-0A 646T- 6456' H 4" x 6.4" Swell Packer 3.9" ID-L40A 8443'- 6498' I-14.5" L-80 12.6# BTC Slotted Liner 3.958" ID-L4-OA 8474'-8464' I-I4" x 6.4" Swell Packer 3.9" ID-L4-0A 8944'- 8934' 1~4" x 6.4" Swell Packer 3.9" ID-L4-OA 1183T- 8968' I-14.5" L-80 12.6# BTC Slotted Liner 3.958" ID-L4-OA 11877 ~ 4.5" 12.6# L-8016T-M shoe (10,574' PBTD}L4-OA - 6076'-6082' Hookwall Hanger below window - 3.99" ID - L3 Oba 6124'- 6114' 4" x 6.4" Swell Packer 3.9" ID-L3-0ba 6497. saBT 4" x 6.4" Swell Packer 3.9" ID-L3-Oba 9709'- 6537' 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID L3-Oba 9904'- 9894' 4" x 6.4" Swell Packer 3.9" ID-L3-0ba 11869'-10127 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID L3-Oba 11,912' 4.5" 12.6# L~0 IBT-M shoe (11,912' PB1D}L306a 61826188 Hookwall Nanger below window - 3.99" ID-L2 -0Bb 6256-6266 4" x 6.4" Swell Packer 3.9" ID-L2-0Bb 6282-11889 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID-L2-OBb 11891' 4.5" 12.6# L~0 IBT-M shoe (11889' PBTD}L2-0Bb ' _~ r ~ ~ ~ ~ \~ ~ U 7018, Weatherford Flow Through Aluminum Billet (partially milled while drilling L1) - MB OBc 7055'-7065' 4" x 6.4" Swell Packer 3.9" ID - MB OBc 7065'-7451' 4.5" 12.6# L-80 IBT solid (3.958" 10) - MB OBc 7451'-11961' 4.5" 12.6# L-80 BTC slotted (3.958" ID) - MB OBc 11963' 4.5" 12.6# L-80 BTC shoe (11961' PBTD) -MB-Obc DATE REV BY COMMENTS DATE REV BY COMMENTS 09/03/06 9ES ORIGINAL COMPLETION 09!04!06 JDNYPAG DRLG DRAFT CORRECTIONS ORION IJNfT WELL: L-204, L1, L2, 13, L4 PERMff No: 206-092 (093) (094) (095) (096) API No: 50-029-23314-00 (80) (61) (62) (63) SEC 34, T12N, R11 E, 2423' NSL & 3544' WEL BP Exploration (Alaska) SCHLUMBERGER Survey report Client .................... Field ..................... Well ...................... API number ................ Engineer .................. RIG :...................... STATE :.................... ----- Survey calculation m Method for positions.....: Method for DLS............ BP Exploration (Alaska) Inc. Orion L-204L1 50-029-23314-60 St Amour Nabors 9ES Alaska ethods------------- Minimum curvature Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Pipe tally GL above permanent.......: 48.75 ft KB above permanent.......: N/A Top Drive DF above permanent.......: 78.60 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 104.91 degrees l`~' a I Gu t~ [(c)2006 IDEAL ID10_2C_01] 5-Aug-2006 20:13:52 Page 1 of 9 Spud date ................. 16-Jul-06 Last survey date.........: 05-Aug-06 Total accepted surveys...: 237 MD of first survey.......: 0.00 ft MD of last survey........: 11916.75 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2005 Magnetic date ............: 16-Jul-2006 Magnetic field strength..: 57579.68 GAMA Magnetic dec (+E/W-).....: 24.17 degrees Magnetic dip .............. 80.86 degrees ----- MWD survey Reference Criteria --------- Reference G ..............: 1002.68 meal Reference H ............... 57579.50 GAMA Reference Dip ............: 80.86 degrees Tolerance of G...........: (+/-) 2.50 meal Tolerance of H............ (+/-)300.00 GAMA Tolerance of Dip.........: (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 24.17 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr ~(+E/W-)....: 24.17 degrees (Total az corr = magnetic dec - grid cony) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction / 1 !~ SCHLUMBERGER Survey Report 5-Aug-2006 20:13:52 Page 2 of 9 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical ------- ------- Displ --------- --------- Displ -------- -------- Total ------- ------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) ------- (ft) --------- (ft) -------- (deg) ------- 100f) ----- - type (deg) ---- ------ --- 1 -------- 0.00 ------ 0.00 ------- 0.00 ------ 0.00 -------- 0.00 -------- 0.00 ------- 0.00 --------- 0.00 -------- 0.00 ------- 0.00 ----- 0.00 - ---- ------ TIP None 2 100.00 0.85 12.39 100.00 100.00 -0.03 0.72 0.16 0.74 12.39 0.85 BP _GYD CT DMS 3 166.00 1.26 13.33 66.00 165.99 -0.07 1.91 0.43 1.96 12.74 0.62 BP _GYD CT DMS 4 261.00 1.00 28.99 95.00 260.97 0.10 3.65 1.07 3.80 16.40 0.42 BP _GYD CT DMS 5 351.00 1.31 131.89 90.00 350.96 1.21 3.65 2.22 4.27 31.31 2.02 BP GYD CT DMS 6 443.00 4.58 153.98 92.00 442.82 4.55 -0.35 4.62 4.63 94.39 3.70 BP _GYD CT DMS 7 533.00 6.02 158.29 90.00 532.44 9.72 -7.97 7.94 11.25 135.11 1.66 BP • _GYD CT DMS 8 626.00 7.28 140.25 93.00 624.82 17.44 -17.03 13.51 21.74 141.57 2.61 BP _GYD CT DMS 9 720.00 8.24 132.06 94.00 717.96 28.29 -26.12 22.32 34.36 139.49 1.56 BP _GYD CT DMS 10 813.00 8.53 135.67 93.00 809.97 40.15 -35.52 32.09 47.87 137.91 0.65 BP GYD CT DMS 11 875.00 9.83 127.28 62.00 871.17 48.99 -42.02 39.51 57.68 136.76 3.00 BP _GYD CT DMS 12 941.45 11.66 111.02 66.45 936.47 60.92 -47.86 50.30 69.43 133.58 5.30 BP _MWD+IFR+MS 13 1037.16 15.11 111.81 95.71 1029.57 82.93 -55.97 70.91 90.34 128.28 3.61 BP _MVJD+IFR+MS 14 1132.97 19.34 108.37 95.81 1121.06 111.17 -65.61 97.58 117.59 123.92 4.54 BP _MWD+IFR+MS 15 1229.64 23.03 106.69 96.67 1211.18 146.06 -76.09 130.89 151.40 120.17 3.87 BP MWD+IFR+MS 16 1324.32 25.69 102.66 94.68 1297.43 185.09 -85.91 168.67 189.28 116.99 3.31 BP _MWD+IFR+MS 17 1420.06 30.67 99.73 95.74 1381.80 230.18 -94.59 213.01 233.07 113.94 5.40 BP _MWD+IFR+MS 18 1515.04 36.39 97.47 94.98 1460.95 282.28 -102.36 264.87 283.96 111.13 6.16 BP _MWD+IFR+MS 19 1610.55 42.03 95.77 95.51 1534.92 341.99 -109.26 324.82 342.70 108.59 6.01 BP _MWD+IFR+MS 20 1711.65 40.01 95.64 101.10 1611.20 407.49 -115.86 390.84 407.65 106.51 2.00 BP MWD+IFR+MS 21 1807.00 41.19 96.35 95.35 1683.59 468.79 -122.34 452.55 468.80 105.13 1.33 BP _MWD+IFR+MS . 22 1902.84 .39.77 96.73 95.84 1756.49 530.34 -129.42 514.36 530.39 104.12 1.50 BP _MWD+IFR+MS 23 1998.47 41.97 96.35 95.63 1828.80 592.25 -136.55 576.53 592.48 103.32 2.32 BP _MWD+IFR+MS 24 2094.14 44.85 96.05 95.67 1898.29 657.23 -143.64 641.88 657.76 102.61 3.02 BP _MWD+IFR+MS 25 2189.87 47.22 96.54 95.73 1964.75 725.35 -151.20 710.36 726.28 102.02 2.50 BP MWD+IFR+MS 26 2285.57 50.89 96.76 95.70 2027.45 796.87 -159.58 782.15 798.26 101.53 3.84 BP _MWD+IFR+MS 27 2381.11 49.73 96.68 95.54 2088.47 869.64 -168.18 855.16 871.54 101.13 1.22 BP _MWD+IFR+MS 28 2477.10 50.42 96.89 95.99 2150.07 942.52 -176.88 928.26 944.96 100.79 0.74 BP _MWD+IFR+MS 29 2572.36 51.15 96.59 95.26 2210.30 1015.57 -185.54 1001.55 1018.59 100.50 0.80 BP _MWD+IFR+MS 30 2668.18 49.72 96.60 95.82 2271.33 1088.66 -194.02 1074.93 1092.30 100.23 1.49 BP MWD+IFR+MS [(c)2006 IDEAL ID10_2C_01~ SCHLUMBERGER Survey Report 5-Aug-2006 20:13:52 Page 3 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) ------- (ft) --------- (ft) -------- (deg) ------- 100f) ----- - type (deg) ---- ------ --- 31 -------- 2764.00 ------ 50.25 ------- 96.37 ------ 95.82 -------- 2332.94 -------- 1161.25 ------- -202.31 --------- 1147.85 -------- 1165.54 ------- 100.00 ----- 0.58 - BP ---- ------ _MWD+IFR+MS 32 2859.46 50.30 96.81 95.46 2393.95 1233.90 -210.73 1220.78 1238.84 99.79 0.36 BP _MWD+IFR+MS 33 2954.76 50.37 96.20 95.30 2454.78 1306.47 -219.05 1293.67 1312.08 99.61 0.50 BP _MWD+IFR+MS 34 3050.79 50.20 96.2$ 96.03 2516.14 1379.50 -227.07 1367.10 1385.83 99.43 0.19 BP _MWD+IFR+MS 35 3146.15 49.93 96.13 95.36 2577.35 1451.78 -234.98 1439.79 1458.84 99.27 0.31 BP _MWD+IFR+MS 36 3241.60 50.12 96.26 95.45 2638.67 1524.08 -242.87 1512.51 1531.89 99.12 0.22 BP _MWD+IFR+MS 37 3337.25 50.04 96.54 95.65 2700.05 1596.63 -251.05 1585.41 1605.17 99.00 0.24 BP • _MWD+IFR+MS 38 3412.18 49.40 96.45 74.93 2748.50 1653.18 -257.51 1642.21 1662.28 98.91 0.86 BP _MWD+IFR+MS 39 3510.50 49.38 95.86 98.32 2812.50 1726.95 -265.52 1716.42 1736.83 98.79 0.46 BP _MWD+IFR+MS 40 3606.56 48.75 97.03 96.06 2875.44 1798.72 -273.66 1788.53 1809.34 98.70 1.13 BP MWD+IFR+MS 41 3701.74 49.73 96.79 95.18 2937.58 1870.11 -282.33 1860.09 1881.40 98.63 1.05 BP _MWD+IFR+MS 42 3797.81 51.14 95.12 96.07 2998.77 1943.26 -290.00 1933.75 1955.38 98.53 1.99 BP _MWD+IFR+MS 43 3893.70 50.93 93.93 95.89 3059.07 2016.60 -295.89 2008.07 2029.76 98.38 0.99 BP _MWD+IFR+MS 44 3989.02 50.62 94.78 95.32 3119.35 2089.19 -301.49 2081.70 2103.42 98.24 0.76 BP _MWD+IFR+MS 45 4084.90 50.09 94.60 95.88 3180.52 2161.84 -307.53 2155.28 2177.11 98.12 0.57 BP MWD+IFR+MS 46 4180.57 49.73 94.27 95.67 3242.13 2233.81 -313.19 2228.25 2250.15 98.00 0.46 BP _MWD+IFR+MS 47 4276.33 49.24 94.88 95.76 3304.34 2305.43 -319.00 2300.82 2322.83 97.89 0.70 BP _MWD+IFR+MS 48 4371.36 49.19 95.48 95.03 3366.42 2376.35 -325.49 2372.48 2394.70 97.81 0.48 BP _MWD+IFR+MS 49 4467.82 48.78 95.70 96.46 3429.72 2448.17 -332.58 2444.92 2467.43 97.75 0.46 BP _MWD+IFR+MS 50 4562.97 50.82 95.77 95.15 3491.14 2519.91 -339.84 2517.22 2540.06 97.69 2.14 BP MWD+IFR+MS 51 4658.78 51.00 96.65 95.81 3551.55 2593.42 -347.89 2591.15 2614.40 97.65 0.74 BP _MWD+IFR+MS • 52 4754.14 51.01 96.40 95.36 3611.55 2666.74 -356.31 2664.78 2688.50 97.62 0.20 BP_MWD+IFR+MS 53 4849.66 50.93 96.02 95.52 3671.71 2740.09 -364.34 2738.55 2762.68 97.58 0.32 BP _MWD+IFR+MS 54 4944.97 50.49 96.74 95.31 3732.06 2813.04 -372.53 2811.86 2836.43 97.55 0.74 BP _MWD+IFR+MS 55 5041.18 50.39 96.73 96.21 3793.33 2886.46 -381.23 2885.52 2910.59 97.53 0.10 BP MWD+IFR+MS 56 5136.35 50.47 97.34 95.17 3853.96 2959.13 -390.22 2958.33 2983.95 97.51 0.50 BP _MWD+IFR+MS 57 5232.61 49.20 96.26 96.26 3916.05 3031.95 -398.93 3031.37 3057.50 97.50 1.57 BP _MWD+IFR+MS 58 5328.23 49.07 96.29 95.62 3978.61 3103.44 -406.84 3103.24 3129.80 97.47 0.14 BP _MWD+IFR+MS 59 5424.12 48.71 96.65 95.89 4041.66 3174.91 -414.98 3175.03 3202.04 97.45 0.47 BP _MWD+IFR+MS 60 5518.74 49.22 97.66 94.62 4103.78 3245.63 -423.87 3245.85 3273.41 97.44 0.97 BP MWD+IFR+MS [(c)2006 IDEAL ID10_2C_01] SCHLLTNIBERGER Survey Report 5-Aug-2006 20:13:52 Page 4 of 9 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical ------- ------- Displ --------- --------- Displ -------- -------- Total ------- ------- At ----- ----- DLS ----- ------ ----- ------ Srvy Tool # depth angle angle length depth section +N/5- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) -------- (ft) -------- (ft) -------- (deg) ------- 100f) ----- - type (deg) ---- ------ --- 61 -------- 5615.31 ------ 48.55 ------- 96.33 ------ 96.57 -------- 4167.28 -------- 3317.68 ------- -432.73 --------- 3318.06 -------- 3346.16 ------- 97.43 ----- 1.25 - BP ---- ------ _MWD+IFR+MS 62 5710.48 48.46 95.99 95,17 4230.34 3388.14 -440.38 3388.93 3417.42 97.40 0.28 BP _MWD+IFR+MS 63 5806.66 50.16 96.26 96,18 4293.04 3460.21 -448.17 3461.44 3490.33 97.38 1.78 BP _MWD+IFR+MS 64 5902.52 54.11 97.19 95,86 4351.87 3535.10 -457.04 3536.58 3565.99 97.36 4.19 BP _MWD+IFR+MS 65 5998.04 57.10 96.96 95.52 4405.82 3613.18 -466.75 3614.79 3644.80 97.36 3.14 BP _MWD+IFR+MS 66 6093.30 60.36 95.81 95.26 4455.26 3693.68 -475.79 3695.69 3726.19 97.34 3.57 BP _MWD+IFR+MS 67 6188.96 64.30 95.67 95.66 4499.68 3777.30 -484.25 3779.97 3810.86 97.30 4.12 BP _MWD+IFR+MS 68 6284.50 68.00 94.93 95.54 4538.30 3863.44 -492.32 3866.96 3898.18 97.26 3.94 BP _MWD+IFR+MS 69 6380.10 71.61 95.88 95.60 4571.30 3951.92 -500.78 3956.27 3987.84 97.21 3.89 BP _MWD+IFR+MS 70 6475.79 75.92 97.30 95.69 4598.05 4042.80 -511.33 4047.51 4079.68 97.20 4.72 BP _MWD+IFR+MS 71 6571.26 79.79 100.39 95.47 4618,13 4135.59 -525.69 4139.70 4172.95 97.24 5.14 BP _MWD+IFR+MS 72 6605.15 82.11 101.65 33.89 4623,46 4168.97 -532.09 4172.55 4206.34 97.27 7.77 BP _MWD+IFR+MS 73 6691.45 83.29 99.14 86.30 4634.43 4254.30 -547.53 4256.74 4291.81 97.33 3.19 BP _Inc+Trend 74 6723.45 85.22 103.21 32.00 4637.63 4286.06 -553.70 4287.97 4323.57 97.36 14.02 BP _Inc+Trend 75 6754.80 89.27 104.77 31.35 4639.14 4317.37 -561.27 4318.34 4354.67 97.41 13.84 BP _MWD+IFR+MS 76 6789.83 89.71 107.94 35.03 4639.45 4352.38 -571.14 4351.95 4389.27 97.48 9.14 BP _MWD+IFR+MS 77 6821.68 89.66 109.85 31.85 4639.63 4384.15 -581.45 4382.08 4420.49 97.56 6.00 BP _MWD+IFR+MS 78 6849.89 89.50 110.09 28.21 4639.84 4412.25 -591.08 4408.59 4448.04 97.64 1.02 BP _MWD+IFR+MS 79 6881.26 89.50 109.90 31.37 4640.11 4443.49 -601.81 4438.07 4478.69 97.72 0.61 BP_MWD+IFR+MS 80 6913.87 89.80 110.56 32.61 4640.31 4475.96 -613.08 4468.67 4510.53 97.81 2.22 BP _MWD+IFR+M5 81 6946.09 89.75 110.46 32.22 4640.44 4508,03 -624.37 4498.85 4541.97 97.90 0.35 BP _MWD+IFR+MS . 82 6978.60 89.65 110.23 32.51 4640.61 4540,39 -635.68 4529.33 4573.72 97.99 0.77 BP _MWD+IFR+MS 83 7010.27 89.59 110.35 31.67 4640.82 4571.92 -646.66 4559.03 4604.67 98.07 0.42 BP _MWD+IFR+M5 84 7040.00 86.39 112.68 29.73 4641.86 4601.43 -657.55 4586.67 4633.56 98.16 13.31 BP _Inc+Trend 85 7073.66 86.48 115.25 33.66 4643.95 4634.60 -671.20 4617.37 4665.90 98.27 7.63 BP _Inc+Trend 86 7105.71 87.16 117.73 32.05 4645.73 4665.95 -685.47 4646.00 4696.30 98.39 8.01 BP _Inc+Trend 87 7137.76 86.90 120.28 32.05 4647.39 4696.99 -700.99 4673.99 4726.27 98.53 7.99 BP _MWD+IFR+MS 88 7169.64 86.64 120.24 31.88 4649.19 4727.69 -717.03 4701.49 4755.85 98.67 0..83 BP _MWD+IFR+MS 89 7201.40 86.14 119.72 31.76 4651.19 4758.29 -732.87 4728.94 4785.39 98.81 2.27 BP_MWD+IFR+MS 90 7233.65 87.87 120.63 32.25 4652.87 4789.36 -749.05 4756.78 4815.40 98.95 6.06 BP _MWD+IFR+MS [(c)2006 IDEAL ID10_2C_01] SCHLUMBERGER Survey Report 5-Aug-2006 20:13:52 Page 5 of 9 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical -------- -------- Displ -------- -------- Displ ------- ------- Total -------- -------- At ----- ----- DLS ----- ------ ----- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg} ------ (deg} ------- (ft) ------ (ft) -------- (ft) -------- (ft) -------- (ft) -------- (ft) ------- (deg) -------- 100f) ----- type (deg) ----- ------ --- 91 -------- 7264.98 ------ 89.77 ------- 117.99 ------ 31.33 -------- 4653.52 -------- 4819.70 -------- -764.39 -------- 4784.09 -------- 4844.77 ------- 99.08 ----- 10.38 -- BP_ --- ------ MWD+IFR+MS 92 7296.71 90.39 116.26 31.73 4653.47 4850.71 -778.85 4812.33 4874.95 99.19 5.79 BP_ MWD+IFR+MS 93 7329.02 89.57 112.43 32.31 4653.48 4882.57 -792.17 4841.76 4906.14 99.29 12.12 BP_ MWD+IFR+MS 94 7361.51 87.35 111.15 32.49 4654.36 4914.81 -804.22 4871.92 4937.85 99.37 7.89 BP_ MWD+IFR+MS 95 7393.08 86.68 111.40 31.57 4656.00 4946.15 -815.66 4901.30 4968.70 99.45 2.26 BP MWD+IFR+MS 96 7424.56 86.45 111.40 31.48 4657.89 4977.37 -827.13 4930.55 4999.45 99.52 0.73 BP_ MWD+IFR+MS 97 7456.78 86.40 112.13 32.22 4659.90 5009.30 -839.05 4960.42 5030.88 99.60 2.27 BP_ • MWD+IFR+MS 98 7488.90 86.09 111.12 32.12 4662.00 5041.13 -850.86 4990.21 5062.23 99.68 3.28 BP_ MWD+IFR+MS 99 7520.74 86.97 113.51 31.84 4663.93 5072.64 -862.93 5019.61 5093.25 99.75 7.99 BP_ MWD+IFR+MS 100 7551.98 86.90 114.40 31.24 4665.60 5103.45 -875.60 5048.12 5123.49 99.84 2.85 BP_ MWD+IFR+MS 101 7583.94 86.98 113.97 31.96 4667.30 5134.95 -888.67 5077.23 5154.42 99.93 1.37 BP_ MWD+IFR+MS 102 7615.97 86.89 113.88 32.03 4669.02 5166.53 -901.64 5106.47 5185.46 100.01 0.40 BP_ MWD+IFR+MS 103 7647.77 86.46 114.05 31.80 4670.86 5197.89 -914.54 5135.48 5216.27 100.10 1.45 BP_ MWD+IFR+MS 104 7679.88 85.85 113.33 32.11 4673.01 5229.55 -927.41 5164.82 5247.42 100.18 2.93 BP_ MWD+IFR+MS 105 7711.54 87.60 114.47 31.66 4674.82 5260.77 -940.21 5193.71 5278.13 100.26 6.59 BP MWD+IFR+MS 106 7742.95 87.90 115.07 31.41 4676.06 5291.69 -953.36 5222.21 5308.52 100.35 2.13 BP_MWD+IFR+MS 107 7774.53 87.51 114.76 31.58 4677.32 5322.76 -966.66 5250.83 5339.07 100.43 1.58 BP_ MWD+IFR+MS 108 7806.87 87.28 114.45 32.34 4678.79 5354.61 -980.11 5280.20 5370.40 100.52 1.19 BP MWD+IFR+MS 109 7838.37 86.97 114.84 31.50 4680.37 5385.61 -993.23 5308.80 5400.91 100.60 1.58 BP_ MWD+IFR+MS 110 7870.52 86.55 114.94 32.15 4682.19 5417.23 -1006.74 5337.91 5432.02 100.68 1.34 BP MWD+IFR+MS 111 7901.91 86.48 114.65 31.39 4684.10 5448.09 -1019.88 5366.36 5462.41 100.76 0.95 BP_ MWD+IFR+MS • 112 7934.29 88.71 115.01 32.38 4685.45 5479.96 -1033.46 5395.72 5493.80 100.84 6.98 BP MWD+IFR+MS 113 7966.67 90.60 112.66 32.38 4685.65 5511.94 -1046.54 5425.33 5525.35 100.92 9.31 BP_ MWD+IFR+MS 114 7998.02 91.04 114.25 31.35 4685.20 5542.94 -1059.02 5454.09 5555.95 100.99 5.26 BP_ MWD+IFR+MS 115 8029.32 92.12 112.77 31.30 4684.34 5573.88 -1071.50 5482.78 5586.50 101.06 5.85 BP MWD+IFR+MS 116 8061.22 92.05 112.69 31.90 4683.18 5605.46 -1083.82 5512.18 5617.72 101.12 0.33 BP_ MWD+IFR+MS 117 8093.19 91.36 111.67 31.97 4682.23 5637.16 -1095.88 5541.77 5649.09 101.19 3.85 BP_ MWD+IFR+MS 118 8125.52 91.47 110.38 32.33 4681.43 5669.29 -1107.48 5571.94 5680.93 101.24 4.00 BP_ MWD+IFR+MS 119 8157.13 91.48 109.48 31.61 4680.61 5700.77 -1118.25 5601.64 5712.17 101.29 2.85 BP_ MWD+IFR+MS 120 8188.76 91.02 109.18 31.63 4679.92 5732.30 -1128.72 5631.48 5743.48 101.33 1.74 BP MWD+IFR+MS [(c)2006 IDEAL ID10_2C_01] SCHLUMBERGER Survey Report 5-Aug-2006 20:13:52 Page 6 of 9 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical ------- -------- Displ --------- -------- Displ ------- ------- Total -------- -------- At ----- ----- DLS ----- ------ ----- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) -------- (ft) -------- (ft) ------- (deg) -------- 100f) ----- type (deg) ----- ------ --- 121 -------- 8220.52 ------ 90.52 ------- 108.57 ------ 31.76 -------- 4679.50 -------- 5763.98 -------- -1138.99 -------- 5661.53 ------- 5774.97 -------- 101.37 ----- 2.48 - BP ---- ------ _MWD+IFR+MS 122 8252.59 90.45 109.20 32.07 4679.23 5795.97 -1149.37 5691.88 5806.76 101.42 1.98 BP_MWD+IFR+MS 123 8283.79 90.90 109.20 31.20 4678.86 5827.08 -1159.63 5721.34 5837.68 101.46 1.44 BP _MWD+IFR+MS 124 8316.02 90.99 109.17 32.23 4678.33 5859.22 -1170.22 5751.77 5869.61 101.50 0.29 BP _MWD+IFR+MS 125 8348.02 90.98 108.56 32.00 4677,78 5891.14 -1180.56 5782.05 5901.34 101.54 1.91 BP _MWD+IFR+MS 126 8379.93 91.23 109.58 31.91 4677,16 5922.96 -1190.99 5812.20 5932.97 101.58 3.29 BP _MWD+IFR+MS 127 8411.07 90.93 108.89 31.14 4676.57 5954.00 -1201.25 5841.60 5963.83 101.62 2.42 BP • _MWD+IFR+MS 128 8442.96 91.25 109.12 31.89 4675.97 5985.81 -1211.63 5871.75 5995.45 101.66 1.24 BP _MWD+IFR+MS 129 8474.74 90.99 108.72 31.78 4675,35 6017.50 -1221.93 5901.80 6026.97 101.70 1.50 BP _MWD+IFR+MS 130 8506.77 90.55 108.86 32.03 4674.92 6049.45 -1232.25 5932.12 6058.76 101.73 1.44 BP _MWD+IFR+MS 131 8539.31 90.66 109.92 32.54 4674,57 6081.89 -1243.05 5962.82 6091.00 101.78 3.27 BP _MWD+IFR+MS 132 8570.93 91.18 109.90 31,62 4674.06 6113.39 -1253.82 5992.54 6122.30 101.82 1.65 BP _MWD+IFR+MS 133 8602.25 91.30 110.04 31,32 4673.39 6144.58 -1264.51 6021.97 6153.30 101.86 0.59 BP _MWD+IFR+MS 134 8634.37 91.54 108.73 32.12 4672.59 6176.59 -1275.17 6052.26 6185.14 101.90 4.15 BP _MWD+IFR+MS 135 8665.79 91.29 108.77 31.42 4671.81 6207.93 -1285.26 6082.00 6216.32 101.93 0.81 BP _MWD+IFR+MS 136 8697.79 90.85 106.25 32.00 4671.22 6239.89 -1294.89 6112.51 6248.16 101.96 7.99 BP _MWD+IFR+MS 137 8729.57 89.59 102.86 31,78 4671.09 6271.66 -1302.87 6143.27 6279.91 101.97 11.38 BP _MWD+IFR+MS 138 8760.87 87.12 100.26 31.30 4671.99 6302.89 -1309.14 6173.92 6311.19 101.97 11.45 BP _MWD+IFR+MS 139 8792.51 84.61 98.82 31.64 4674.27 6334.31 -1314.37 6205.03 6342.71 101.96 9.14 BP _MWD+IFR+MS 140 8824.56 84.14 98.51 32,05 4677.42 6366.01 -1319.18 6236.56 6374.56 101.94 1.75 BP MWD+IFR+MS 141 8856.79 83.65 97.84 32.23 4680.84 6397.84 -1323.74 6268.29 6406.53 101.92 2.57 BP _MWD+IFR+MS • 142 8888.11 84.57 99.25 31.32 4684.06 6428.80 -1328.37 6299.09 6437.63 101.91 5.36 BP _MWD+IFR+MS 143 8920.39 84.78 100.60 32.28 4687.05 6460.82 -1333.91 6330.75 6469.75 101.90 4.21 BP _MWD+IFR+MS 144 8952.13 85.04 101.23 31.74 4689.87 6492.36 -1339.89 6361.79 6501.36 101.89 2.14 BP _MWD+IFR+MS 145 8983.76 84.99 102.95 31.63 4692.62 6523.83 -1346.49 6392.60 6532.87 101.89 5.42 BP MWD+IFR+MS 146 9015.46 84.22 102.03 31.70 4695.60 6555.36 -1353.32 6423.42 6564.43 101.90 3.77 BP MWD+IFR+MS ~ 147 9047.80 86.11 102.11 32.34 4698.32 6587.54 -1360.05 6454.93 6596.65 101.90 5.85 BP MWD+IFR+MS 148 9079.37 86.71 101.90 31.57 4700.30 6619.01 -1366.61 6485.75 6628.16 101.90 2.01 BP _MWD+IFR+MS 149 9111.36 86.35 101.02 31.99 4702.24 6650.88 -1372.95 6517.04 6660.09 101.90 2.97 BP _MWD+IFR+MS 150 9143.52 86.01 100.85 32.16 4704.38 6682.89 -1379.04 6548.55 6692.18 101.89 1.18 BP _MWD+IFR+MS [(c)2006 IDEAL ID10_2C_01~ SCHLUMBERGER Survey Report 5-Aug-2006 20:13:52 Page 7 of 9 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical ------- ------- Displ --------- --------- Displ ------- ------- Total -------- -------- At ----- ----- DLS ----- ------ ----- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) -------- (ft) -------- (ft) ------- (deg) -------- 100f) ----- type (deg) ----- ------ --- 151 -------- 9176.06 ------ 86.43 ------- 102.36 ------ 32.54 -------- 4706.53 -------- 6715,31 -------- -1385.57 -------- 6580.35 ------- 6724.64 -------- 101.89 ----- 4.81 - BP ---- ------ _MWD+IFR+MS 152 9207.89 86.22 102.52 31,83 4708,57 6747.04 -1392.41 6611.37 6756.41 101.89 0.83 BP_MWD+IFR+MS 153 9238.88 85.93 101.32 30.99 4710.69 6777.92 -1398.80 6641.62 6787.32 101.89 3.97 BP _MWD+IFR+MS 154 9270.62 84.88 103.64 31.74 4713.23 6809,53 -1405.64 6672.51 6818.96 101.90 8.00 BP _MWD+IFR+MS 155 9302.75 84.37 106.52 32.13 4716.24 6841.51 -1413.96 6703.39 6850.89 101.91 9.06 BP _MWD+IFR+MS 156 9334.89 84.39 108.01 32.14 4719.39 6873,47 -1423.45 6733.94 6882.74 101.94 4.61 BP _MWD+IFR+MS 157 9365.98 84.52 108.12 31,09 4722,39 6904.37 -1433.05 6763.36 6913.51 101.96 0.55 BP _MWD+IFR+MS 158 9398.84 85.01 107.74 32.86 4725.39 6937.04 -1443.12 6794.49 6946.05 101.99 1.88 BP _MWD+IFR+MS 159 9430.31 84.99 107.54 31.47 4728.13 6968.36 -1452.62 6824.36 6977.25 102.02 0.64 BP _MWD+IFR+MS 160 9461.75 85.85 110.37 31.44 4730.64 6999.62 -1462.80 6854.00 7008.36 102.05 9.38 BP MWD+IFR+MS 161 9493.96 88.61 114.82 32.21 4732.20 7031.49 -1475.16 6883.69 7039.98 102.10 16.24 BP _MWD+IFR+MS 162 9526.10 89.14 114.94 32.14 4732.83 7063.14 -1488.68 6912.84 7071.32 102.15 1.69 BP _MWD+IFR+MS 163 9558.25 89.23 115.76 32.15 4733.29 7094.75 -1502.44 6941.90 7102.62 102.21 2.57 BP _MWD+IFR+MS 164 9589.38 89.47 115.41 31.13 4733.64 7125.34 -1515.88 6969.97 7132.91 102.27 1.36 BP _MWD+IFR+MS 165 9621.92 89.10 115.22 32.54 4734.05 7157.34 -1529.79 6999.38 7164.61 102.33 1.28 BP MWD+IFR+MS 166 9653.38 87.71 115.72 31.46 4734.92 7188.26 -1543.32 7027.78 7195.24 102.39 4.70 BP _MWD+IFR+MS 167 9685.23 87.57 116.63 31.85 4736.24 7219.47 -1557.36 7056.33 7226.15 102.45 2.89 BP _MWD+IFR+MS 168 9717.35 86.97 113.63 32.12 4737.77 7251.04. -1570.98 7085.38 7257.45 102.50 9.51 BP _MWD+IFR+MS 169 9748.29 87.07 113.74 30.94 4739.37 7281.57 -1583.39 7113.67 7287.76 102.55 0.48 BP _MWD+IFR+MS 170 9780.76 89.34 115.75 32.47 4740.39 7313.55 -1596.97 7143.14 7319.48 102.60 9.34 BP MWD+IFR+MS 171 9813.09 91.42 118.73 32.33 4740.18 7345.13 -1611.77 7171.88 7350.76 102.67 11.24 BP _MWD+IFR+MS • 172 9844.63 90.81 123.02 31.54 4739.56 7375.44 -1627.95 7198.94 7380.72 102.74 13.74 BP _MWD+IFR+MS 173 9876.30 90.02 123.61 31.67 4739.33 7405.48 -1645.34 7225.41 7410.37 102.83 3.11 BP _MWD+IFR+MS 174 9908.29 90.38 124.01 31.99 4739.22 7435.75 -1663.14 7251.99 7440.25 102.92 1.68 BP _MWD+IFR+MS 175 9940.54 90.69 122.76 32.25 4738.92 7466.33 -1680.89 7278.91 7470.47 103.00 3.99 BP MWD+IFR+MS 176 9972.39 90.80 123.16 31.85 4738.51 7496.61 -1698.21 7305.63 7500.41 103.09 1.30 BP _MWD+IFR+MS 177 10004.37 91.35 123.51 31.98 4737.91 7526.95 -1715.79 7332.35 7530.42 103.17 2.04 BP _MWD+IFR+MS 178 10035.25 91.55 123.14 30.88 4737.13 7556.24 -1732.74 7358.14 7559.41 103.25 1.36 BP _MWD+IFR+MS 179 10067.52 91.40 123.68 32.27 4736.29 7586.83 -1750.51 7385.07 7589.70 103.33 1.74 BP _MWD+IFR+MS 180 10099.95 91.07 123.22 32.43 4735.60 7617.57 -1768.38 7412.12 7620.15 103.42 1.75 BP MWD+IFR+MS [(0)2006 IDEAL ID10_2C_01] d SCHLUMBERGER Survey Report 5-Aug-2006 20:13:52 Page 8 of 9 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical -------- -------- Displ -------- -------- Displ -------- -------- Total ------- ------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) -------- (ft) -------- (ft) -------- (deg) ------- 100f) ----- - type (deg) ---- ------ --- 181 -------- 10131.65 ------ 91.21 ------- 122.81 ------ 31.70 -------- 4734.96 -------- 7647.70 -------- -1785.65 -------- 7438.70 -------- 7650.02 ------- 103.50 ----- 1.37 - BP ---- ------ _MWD+IFR+MS 182 10162.88 90.85 122.82 31.23 4734.40 7677.41 -1802.57 7464.94 7679.49 103.58 1.15 BP _MWD+IFR+MS 183 10195.04 90.59 123.29 32.16 4734.00 7707.97 -1820.11 7491.89 7709.82 103.66 1.67 BP _MWD+IFR+MS 184 10227.07 92.63 123.91 32.03 4733.10 7738.29 -1837.83 7518.56 7739.92 103.74 6.66 BP _MWD+IFR+MS 185 10259.47 92.90 122.52 32.40 4731.54 7769.02 -1855.55 7545.63 7770.44 103.82 4.37 BP MWD+IFR+MS 186 10290.54 93.35 124.32 31.07 4729.84 7798.44 -1872.64 7571.53 7799.67 103.89 5.96 BP _MWD+IFR+MS 187 10322.54 91.86 123.08 32.00 4728.39 7828.70 -1890.38 7598.12 7829.75 1.03.97 6.06 BP • _MWD+IFR+MS 188 10354.57 89.38 121.78 32.03 4728.04 7859.24 -1907.55 7625.15 7860.13 104.05 8.74 BP _MWD+IFR+MS 189 10386.25 86.08 120.56 31.68 4729.30 7889.62 -1923.93 7652.23 7890.38 104.11 11.10 BP _MWD+IFR+MS 190 10418.11 84.78 120.83 31.86 4731.83 7920.18 -1940.14 7679.54 7920.83 104.18 4.17 BP MWD+IFR+MS 191 10450.51 84.88 119.65 32.40 4734.75 7951.30 -1956.39 7707.42 7951.84 104.24 3.64 BP _MWD+IFR+MS 192 10482.26 84.99 120.17 31.75 4737.56 7981.85 -1972.16 7734.83 7982.30 104.30 1.67 BP _MWD+IFR+MS 193 10514.04 84.85 121.91 31.78 4740.37 8012.26 -1988.48 7761.95 8012.61 104.37 5.47 BP _MWD+IFR+MS 194 10546.00 84.79 121.92 31.96 4743.26 8042.69 -2005.31 7788.97 8042.97 104.44 0.19 BP _MWD+IFR+MS 195 10577.76 84.32 121.85 31.76 4746.27 8072.93 -2022.01 7815.82 8073.14 104.50 1.50 BP MWD+IFR+MS 196 10609.63 83.80 121.65 31.87 4749.57 8103.27 -2038.69 7842.77 8103.41 104.57 1.75 BP _MWD+IFR+MS 197 10641.13 83.51 121.24 31.50 4753.05 8133.29 -2055.02 7869.48 8133.38 104.64 1.59 BP _MWD+IFR+MS 198 10673.09 84.21 124.78 31.96 4756.47 8163.48 -2072.33 7896.12 8163.54 104.71 11.23 BP _MWD+IFR+MS 199 10705.35 85.15 126.84 32.26 4759.46 8193.49 -2091.13 7922.17 8193.51 104.79 6.99 BP _MWD+IFR+MS 200 10737.26 84.95 125.27 31.91 4762.21 8223.14 -2109.84 7947.87 8223.14 104.87 4.94 BP MWD+IFR+MS 201 10768.91 84.52 126.45 31.65 4765.12 8252.57 -2128.30 7973.41 8252.57 104.95 3.95 BP _MWD+IFR+MS 202 10800.93 83.85 125.67 32.02 4768.36 8282.28 -2147.05 7999.16 8282.30 105.02 3.20 BP _MWD+IFR+MS 203 10833.90 84.96 126.87 32.97 4771.58 8312.84 -2166.46 8025.62 8312.89 105.11 4.95 BP _MWD+IFR+MS 204 10864.80 87.42 125.01 30.90 4773.63 8341.61 -2184.55 8050.58 8341.71 105.18 9.97 BP _MWD+IFR+MS 205 10896.27 89.47 122.46 31.47 4774.48 8371.39 -2202.02 8076.74 8371.53 105.25 10.39 BP MWD+IFR+MS 206 10928.29 91.32 121.50 32.02 4774.26 8401.99 -2218.98 8103.89 8402.20 105.31 6.51 BP _MWD+IFR+MS 207 10961.07 91.66 117.46 32.78 4773.41 8433.70 -2235.10 8132.42 8433.97 105.37 12.36 BP _MWD+IFR+MS 208 10992.42 90.66 113.81 31.35 4772.78 8464.49 -2248.66 8160.67 8464.81 105.41 12.07 BP _MWD+IFR+MS 209 11024.71 91.57 111.20 32.29 4772.15 8496.49 -2261.02 8190.49 8496.84 105.43 8.56 BP _MWD+IFR+MS 210 11056.09 92.70 109.82 31.38 4770.98 8527.70 -2272.00 8219.86 8528.08 105.45 5.68 BP MWD+IFR+MS [(c)2006 IDEAL ID10_2C_01] SCHLUP~IBERGER Survey Report 5-Aug-2006 20:13:52 Page 9 of 9 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical -------- -------- Displ -------- -------- Displ ------- ------- Total -------- -------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (f t) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) -------- (ft) -------- (ft) ------- (deg) -------- 100f) ----- - type (deg) ---- ------ --- 211 -------- 11088.07 ------ 92.35 ------- 109.07 ------ 31.98 -------- 4769.57 -------- 8559.55 -------- -2282.64 -------- 8249.99 ------- 8559.95 -------- 105.47 ----- 2.59 ----- ------ BP_MWD+IFR+MS 212 11119.97 92.40 108.81 31.90 4768.25 8591.34 -2292.98 8280.13 8591.76 105.48 0.83 BP _MWD+IFR+MS 213 11151.54 91.82 105.95 31.57 4767.09 8622.86 -2302.41 8310.24 8623.29 105.49 9.24 BP _MWD+IFR+MS 214 11182.65 91.77 102.95 31.11 4766.11 8653.95 -2310.17 8340.35 8654.38 105.48 9.64 BP _MWD+IFR+MS 215 11215.40 91.55 104.59 32.75 4765.16 8686.67 -2317.96 8372.14 8687.10 105.48 5.05 BP _MWD+IFR+MS 216 217 11247.33 11278.98 91.34 90.88 104.69 104.45 31.93 31.65 4764.36 4763.74 8718.59 8750.24 -2326.02 -2333.99 8403.02 8433.65 8719.01 8750.65 105.47 105.47 0.73 1.64 BP BP _MWD+IFR+MS _MWD+IFR+MS 218 11311.21 90.29 104.56 32.23 4763.42 8782.46 -2342.06 8464.85 8782.88 105.47 1.86 BP _MWD+IFR+MS 219 11342.97 90.74 104.35 31.76 4763.13 8814.22 -2349.98 8495.60 8814.63 105.46 1.56 BP _MWD+IFR+MS 220 11375.14 90.59 104.33 32.17 4762.76 8846.39 -2357.95 8526.77 8846.79 105.46 0.47 BP _MWD+IFR+MS 221 11406.98 89.93 104.41 31.84 4762.61 8878.23 -2365.85 8557.61 8878.63 105.45 2.09 BP _MWD+IFR+MS 222 11439.22 91.70 104.68 32.24 4762.15 8910.46 -2373.95 8588.81 8910.86 105.45 5.55 BP _MWD+IFR+MS 223 11470.83 91.14 104.98 31.61 4761.37 8942.06 -2382.04 8619.36 8942.45 105.45 2.01 BP _MWD+IFR+MS 224 11502.47 90.90 104.42 31.64 4760.81 8973.69 -2390.06 8649.96 8974.09 105.45 1.93 BP _MWD+IFR+MS 225 11534.75 92.13 105.40 32.28 4759.95 9005.96 -2398.37 8681.14 9006.35 105.44 4.87 BP _MWD+IFR+MS 226 11566.20 92.32 104.94 31.45 4758.73 9037.39 -2406.59 8711.47 9037.78 105.44 1,58 BP _MWD+IFR+MS 227 11598.83 89.95 103.67 32.63 4758.08 9070.01 -2414.65 8743.08 9070.39 105.44 8.24 BP _MWD+IFR+MS 228 11629.99 86.69 101.58 31.16 4759.00 9101.12 -2421.46 8773.47 9101.50 105.43 12,43 BP _MWD+IFR+MS 229 11661,75 86.36 101.87 31.76 4760.92 9132.77 -2427.90 8804.51 9133.13 105.42 1,38 BP _MWD+IFR+MS 230 11694,25 86.87 101.45 32.50 4762.84 9165.17 -2434.46 8836.28 9165.50 105.40 2,03 BP MWD+IFR+MS 231 11726,21 88.78 103.79 31.96 4764.06 9197.07 -2441.43 8867.45 9197.40 105.39 9.45 BP _MWD+IFR+MS 232 11757,86 88.77 103.92 31.65 4764.73 9228.71 -2449.01 8898.17 9229.03 105.39 0.41 BP _MWD+IFR+MS • 233 11789.53 88.60 104.04 31.67 4765.46 9260.37 -2456.66 8928.89 9260.68 105.38 0.66 BP _MWD+IFR+MS 234 11821,68 88.15 102.57 32.15 4766.37 9292.49 -2464.06 8960.17 9292.80 105.38 4.78 BP _MWD+IFR+MS 235 11853.02 87.70 102.74 31.34 4767.51 9323.79 -2470.92 8990.72 9324.08 105.37 1.53 BP MWD+IFR+MS 236 11885.36 88.99 104.51 32.34 4768.44 9356.10 -2478.53 9022.14 9356.39 105.36 6.77 BP _MWD+IFR+MS 237 11916.75 88.78 103.06 31.39 4769.05 9387.48 -2486.01 9052.62 9387.77 105.36 4.67 BP _MWD+IFR+MS 238 11965.00 88.78 103.06 48.19 4770.08 9435.69 -2496.92 9099.61 9435.96 105.34 0.00 Pr ojected to TD [(c)2006 IDEAL ID10_2C_01] • • Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: AOGCC -Librarian Well No L-204L1 Date Dispatched: 15-Jul-06 Installation/Rig Nabors 9ES Dispatched By: Melissa Schaaf LWD Log Delivery V1.1, 10-02-03 Data No Of Prints No of Floppies Surveys 2 1 Received By: Please sign and return to: Drilling & Measurements LWD Division 2525 Gambell Street, Suite 400 ~~~ ~ Anchorage, Alaska 99501 nrosel@slb.com Fax: 907-561-8317 ~ _ \ ti ~~ ~ ~ 1 ~ ~ ~ '~ ~ i 1 . ALASSA OII, A1QD GAS COI~TSERQA'TI011T COrII~iISSIOI~T Robert Tirpack Senior Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 333 W. 7T" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Orion Schrader Bluff Oil Pool, PBU L-204L 1 BP Exploration (Alaska) Inc. Permit No: 206-093 Surface Location: 2423' FSL, 3544' FEL, SEC. 34, T12N, R11E, UM Bottomhole Location: 11' FNL, 294' FWL, SEC. O1, Tl 1N, Rl lE, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. The permit is for a new wellbore segment of existing well PBU L-204, Permit No. 206-092, API No. 50-029-23314-00. Production should continue to be reported as a function of the original API number stated above. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a represe tive of the Commission to witness any required test, contact the Commissio s etroleum field inspector at (907) 659-3607 (pager). ~_ DATED this~day of July, 2006 FRANK H. MURKOWSK/, GOVERNOR cc: Department of Fish 8s Game, Habitat Section w/ o encl. Department of Environmental Conservation w/ o encl. ' STATE OF ALASKA '~l ~ ~ ALAS~IL AND GAS CONSERVATION COMM~N • /, l~ PERMIT TO DRILL 20 AAC 25.005 ~..loj3o ZOOfo ~~~! .JUN ;G ,i f0( ~i nr__~__ ,,., „ 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify i we is p e uit'1ti1lS ^ Coalbed Methane emirates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU L-204L1 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 11976 TVD 4749 12. Field /Pool(s): Prudhoe Bay Field / Orion 4a. Location of Well (Governmental Section): Surface: 2423' FSL 3544' FEL 34 T12N SEC R11 E UM 7. Property Designation: ADL 028240 Schrader Bluff , , , , . , Top of Productive Horizon: 1853' FSL, 707' FWL, SEC. 35, T12N, R11 E, UM (OBd) 8. Land Use Permit: 13. Approximate Spud Date: July 17, 2006 Total Depth: 11' FNL, 294' FWL, SEC. 01, T11 N, R11 E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 8550' 4b. Location of Well (State Base Plane Coordinates): Surface: x-583372 y-5978147 Zone-ASP4 10. KB Elevation Plan (Height above GL): 78.6 feet 15. Distance to Nearest Well Within Pool: 190' 16. Deviated Wells: Kickoff Depth: 7131 feet Maximum Hole Angle: 90 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 2010 Surface: 1558 18. Casin Pro tam: S ecifications To - Settin Depth -Bottom Quantity of Cement, c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 6-3/4" 4-1/2" 12.6# L-80 IBT 5776' 6200' 4511' 11976' 4749' Uncemented Slotted Liner 19. PRESENT WELL CONDITION SUMMARY (To be completed fior Redrill and Re-entry Operations} Total Depth MD (ft): 11981 Total Depth TVD (ft): 4694 Plugs (measured): None Effective Depth MD (ft): 11981 Effective Depth TVD (ft). 4694 Junk (measured): None Casing -- Length Size CemenYVolume MD TVD Conductor /Structural 110' 20" x 34" 260 sx Arctic Set A rox. 110' 110' Surface 3449' 10-3/4" 602 sx AS Lite, 403 sx Class 'G' 3449' 2794' Intermediate 6706' 7-5/8" 561 sx Class 'G' 6706' 4629' Production Liner 4850' 4-1/2" Uncemented Slotted Liner OBc 7131' - 11981' 4639' - 4694' Perforation Depth MD (ft): None Perforation Depth TVD (ft): None 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ® Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Scott Kolstad, 564-5347 Printed Name Robert Tirpack Title Senior Drilling Engineer Prepared By Name/Number: Si nature ~ „ Phone 564-4166 Date d~ Terrie Hubble, 564-4628 Commission Use Onl y Permit To Drill Number: API Number: 50- (3 Z Q - ,Z ~ 3 / -~ G'Q Permit Approv I Date: ~ See cover letter for other requirements Conditions of Approval: ~,~ If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shalesaw _ Samples Req'd: ^ Yes ~No Mud Log Req'd: ^ Yes ~No 2 ,D r .Zf ~- l~~~C [~ 7 ~~ ~ ~'" (it, . HZS Measures: Yes ^ No Directional Survey Req'd:~Yes ^ No Other: v ~ ~C 25.0 3 C- C~. ~ ~i C ~ Pct r s cea,.-~. ~ ~ ~, a,l >~e~,-ems.- ~ B 1'E' S y~ >~e~ d s «~o y~ t~ c!e~, APPROVED BY THE COMMISSIO e ~ ~ ,COMMISSIONER )tt Form 10-401 Revised 12/2005 ~ -~ ~ ~ ~ is f-3 i t / ~,/'" Submit In Duplicate • • Well Name: L-204, L-204L1, L-204L2, L-204L3, & L-204L4 Drill and Complete Plan Summary Type of Well (producer or injector): Schrader Bluff OA, OBa, OBb, OBc, and OBd Multi-Lat producer Surface Location: X = 583,371.74 Y = 5,978,146.73 As Built Sec 34, T 12N, R 11 E, 2423' FSL & 3544' FEL L-204 OBc Target Start: X = 588,460 Y = 5,977,320 Z = -4510 TVDSS Sec 35, T 12N, R11 E, FEL: 3746.46 FSL: 1538.03 L-204 OBc Target End: X = 592,520 Y = 5,975,820 Z = -4615 TVDSS Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81 L-204L1 OBd Target Start: X = 587,630 Y = 5,977,625 Z = -4550 TVDSS Sec 35, T 12N, R11E, FEL: 4572.43 FSL: 1852.93 L-204L1 OBd Target End: X = 592,520 Y = 5,975,820 Z = -4670 TVDSS Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81 L-204L2 OBb Target Start: X = 587,455 Y = 5,977,625 Z = -4430 TVDSS Sec 35, T 12N, R11 E, FEL: 4747.41 FSL: 1855.03 L-204L2 OBb Target End: X = 592,520 Y = 5,975,820 Z = -4565 TVDSS Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81 L-204L3 OBa Target Start: X = 587,435 Y = 5,977,625 Z = -4385 TVDSS Sec 35, T 12N, R11 E, FEL: 4767.41 FSL: 1855.26 L-204L3 OBa Target End: X = 592,520 Y = 5,975,820 Z = -4515 TVDSS Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81 L-204L4 OA Target Start: X = 587,350 Y = 5,977,625 Z = -4325 TVDSS Sec 35, T 12N, R11 E, FEL: 4852.40 FSL: 1856.26 L-204L4 OA Target End: X = 592,520 Y = 5,975,820 Z = -4455 TVDSS Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81 AFE Number: TBD Ri Nabors 9ES GL: 50.1 RT: 28.5 RTE: 78.6 Estimated Start Date: July 17, 2006 Well Information Distance to Nearest Property: Distance to Nearest Well in Pool: Well Type: Current Status: Conductor: BHT: BHP: O eratin da s to com lete: 50 8550' to PBU boundary 190' from L-104 at 6,940' in L-204 Schrader O-sand Penta-lateral Producer New well 20" X 34", 215.5 ppf, A53, ERW set at 110' KB 85 °F ~ 4290' TVDss 90 °F ~ 4525' TVDss 8.3 - 8.6 EMW ppg in Schrader OBd sands Permit to Drill 6/21/06 • ~ Formation Markers: 7 Formation To s TVD ss and Est. Pore Pressures Est. Formation To s Uncertain Commercial Hydrocarbon Bearin Est. Pore Press. Est. Pore Press. Formation TVDss feet Yes/No Psi G1 -255 +/-50' No 115 8.7 Fault #1 - L Pad Fault -880 +/- 100' No - - SV6 faulted to -880 +/-50' No 396 8.7 SV5 -1480 +/-50' No 666 8.7 SV4 -1610 +/-50' No 725 8.7 Base Permafrost -1685 +/-50' No 758 8.7 SV3 -1985 +/-50' Gas H drates 893 8.7 SV2 -2155 +/-50' Gas H drates 970 8.7 SV1 -2490 +/-50' Gas H drates 1121 $.7 UG4 -2795 +/-50' Thin coa- 1258 8.7 UG4A -2825 +/-50' Heavy Oil between -2800 and -2860' SS 1271 8.7 UG3 -3190 +/-50' Thin coals 1436 8.7 UG1 -3695 +/-50' Heavy Oil from - 3820 to -3995' SS 1663 8.7 Fault #2 -3890 +/- 100' No - - UG_Ma faulted to -3890 +/-50' Yes 1751 8.7 UG_Mbl -3910 +/-50' Yes - - UG_Mb2 -3970 +/-50' Yes 1787 8.7 UG_MC -4065 +/-50' No Wet 1829 8.7 SB_Na -4130 +/-25' No Wet 1859 8.7 SB_Nb -4160 +/-25' No Wet 1872 8.7 SB_Nc -4190 +/-25' No Wet 1886 8.7 SB_Ne -4200 +/-25' No Wet 1890 8.7 SB_OA -4290 +/-25' Yes 1840- 1900 8.3 - 8.6 SB_OBa -4360 +1-25' Yes 1870- 1940 8.3 - 8.6 SB_OBb -4405 +/-25' Yes 1890- 1960 8.3 - 8.6 SB_OBc -4465 +/-25' Yes 1985 8.6 SB OBd -4525 +/-25' Yes 1940- 2010 8.3 - 8.6 SB OBe not reached +/-25' Yes Well TD Criteria TD for all laterals will be at end of polygon. No extensions beyond the end of the polygons are planned. Comments G1 through Nf formation pressures were estimated based on hydrostatic gradients extrapolated at .45 psi/ft gradient down from surface. O sand pressures were extrapolated from L-120 and V-102 MDT pressures, but are assumed to be slightly to moderately depleted (except OBc) in the L-204 area due to L-201 production. 2 Permit to Drill 6-21-06 • • Mud Program: 13-1/2" Surface Hole Mud Pro erties: Spud -Freshwater Mud Interval Densi Funnel vis YP PH FL initial 8.5 - 9.1 250-300 50-70 8.5-9.0 NC-8.0 Base Perm 9.0 - 9.5 200-250 30-45 8.5-9.0 8.0 Interval TD 9.6 max 200-250 30-40 8.5-9.0 5.0-7.0 9-7/8" Intermediate Hole Mud Pro erties: Freshwater Mud (LSND) Interval Densi YP PV API Filtrate MBT H Chlorides Surface shoe to interval TD 8.8 - 9.3 22-30 12-18 4-6 < 20 9.0-9.5 <600 6-3/4" Production Hole Mud Pro erties: LVT-200 MOBM (Versa-Pro) Interval Densi Stabili Oil: Water Ratio YP PV API Filtrate MBT All five Laterals 9.2 650-900 80:20, initial 15-19 <20 4-5.5 < 6 Survey and Logging Program: 13-1/2" Hole Section: Surface Gyro may be needed O en Hole: MWD / GR Cased hole: None 9-7/8" Intermediate Hole: Surveys will be IIFR corrected real time and multi-station O en hole: MWD ! GR / Res / Azimuthal Den / Neu / PW D Cased Hole: None 6-3/4" Produciion Holes: Surveys will be IIFR corrected real time and multi-station O en hole: MWD / GR / Res / Azimuthal Den / Neu /AIM / PWD Cased Hole: N/A Casing/Tubing Program Hole Size Csg / Tb O.D. Wt/Ft Grade Conn Burst si Collapse si Length Top MD /TVD Bottom MD /TVD 48" 20" X 34" 215.5# A53 Weld GL 110'/110' 13-'/2" 10-3/a" 45.5# K-55 BTC 3,580 2,090 3449' GL 3449' / 2794' 9-%e' 7-5/8" 29.7# L-80 BTC-M / TC-I I 6,890 4,790 6706' GL 6706' / 4629' 6-3/a" OBd 4-Y2" slotted 12.6# L-80 IBT N/A N/A 5776' 6200' / 4511' 11976' / 4749' 6-3/a" OBC 4-~/z" slotted 12.6# L-80 IBT N/A N/A 4850' 7131' / 4639' 11981' / 4694 6-3/a" OBb 4-~/2" slotted 12.6# L-80 IBT N/A N/A 5839' 6122' / 4479' 11961' / 4644' 6-3/a" OBa 4-~/z" slotted 12.6# L-80 IBT N/A N/A 5930' 6017' / 4429' 11947' / 4594' 6-3/a" OA 4-~/2" slotted 12.6# L-80 IBT N/A N/A 6045' 5876' / 4352' 11921' / 4534' Tubin 4-~/2" 12.6# L-80 IBT-M 8,430 7,500 5800' GL 5800' / 4305' Surface and Anti-Collision Issues Surface Shut-in Wells: L-104 and L-106 will require surface shut-in and well house removal in order to move over well L-204. No other wells should require well house removal and surface shut-in. Close Approach Shut-in Wells: One well will require subsurface isolation for this profile. L-104 will remain shut in until all 5 laterals pass the close approach depth. 3 Permit to Dri116-21-06 • Close Approach Well List: • Lateral Well Ctr-Ctr Reference Allowable Precautionary Name Distance MD Deviation Comment OBc L-104 190' 6940 -27.71 Use Traveling C tinder OBb L-104 197.26 6836.1 180.18 Use Traveling C inder OBa L-104 221.31 6772 203.39 Use Traveling C inder OA L-104 211.84 6516 198.88 Use Traveling C tinder Cement Calculations Casing Size: 10-3/a -in 45.5-Ib/ft K-55 BTC surface casing Basis: Lead: 250% excess over gauge hole in permafrost, 30% excess over gauge hole below permafrost Lead TOC: Surface Tail: 1,000' of open hole with 30% excess, plus 80' shoe track Tail TOC: 2,449' MD 1,000' MD above shoe Total Cement Volume: Spacer 75 bbls of Viscosified Spacer weighted to 10.10 ppg (Mud Push) Lead 476 bbls, 2673 cult, 602 sks 10.7 tb/ al ASL G + adds - 4.44 cuftlsk Tail 84 bbls, 472 cuft, 403 sks 15.8 Ib/ al Class G + adds -1.17 cuft/sk Temp BHST --55° F, BHCT ~60° F estimated by Schlumberger In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Casing Size: 7-5/8", 29.7-Ib/ft L-80 BTC-M / TC-II intermediate casin Basis: Lead: None Lead TOC: N/A Tail: 2257' of open hole with 30% excess, plus 80' shoe track Tail TOC: 4449' MD 827' MD above the Ma, 1000' MD below Surface Shoe Total Cement Volume: Wash 20 bbls CW100 S acer 50 bbls of Viscosified S acer Mud ush Wei hted to 10.3 Tail 116 bbls, 651 cuft, 561 sks 15.8 Ib/ al G + Gasblok -1.16 cuft/sk Temp BHST ~ 90° F at 4525 TVDss, from SOR Centralizer Recommendations 10-3/a" Casing Centralizer Placement a) Run (25) 10-3/4" Bow-spring centralizers attached over the collar of each joint of casing from the casing shoe up to 1,000' MD above the shoe. 7-S/e" Casing Space Out a) Spaceout the 7 5/e" casing to place a full joint in the window area of the OBb, OBa and OA sands. b) Place 1 RA tag above each window exit. RA tags to be spaced out ~40 - 80' above window depth except on the OBd lateral. The RA tag for the OBd lateral will need to be placed 1125' above the casing shoe. 4 Permit to Drill 6-21-06 Well Control 35©0 ~~~ Well control equipment consisting of 5,000 psi working pressure pipe ms (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximu otential surface pressures. Based upon calculations below, BOP equipment will be tested to ~-9tj0 psi. BOP regular test frequency will be 14 days, with a function test every 7 days. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Surface Hole A diverter will be nippled up and function tested prior to drilling surface hole Intermediate Section • Maximum anticipated BHP: ~,~-2,010 psi -Schrader OBd (8.6 ppg C~ 4,525' TVDss) • Maximum surface pressure: 1,558 psi -Based on a full column of gas @ 0.10 psi/ft • Planned BOP test pressure: 3$~3;A6tj psi/250 psi Rams 2,500 psi/250 psi Annular • 10-3/4" Casing Test: 2,500 psi (K-55 casing burst is 3,580 psi) • Integrity Test - 9-7/8" hole: LOT • Kick Tolerance: 145 bbls with a 12.5 ppg EMW LOT , 8.6 ppg OBd Production Section • Maximum anticipated BHP: ~~2,010 psi - Schrader OBd (8.6 ppg C~ 4,525' TVDss) • Maximum surface pressure: 1,558 psi -Based on a full column of gas C«3 0.10 psi/ft • Planned BOP test pressure: tsoo~;g6® psi/250 psi Rams 2,500 psi/250 psi Annular • 7-5/8" Casing Test: 3,500 psi • Integrity Test - 6-3/4" hole: FIT to 11.5ppg EMW for OBc lateral only • Kick Tolerance: Infinite at OBc, OBd, OBb, OBa, and OA with an 11.5 ppg EMW FIT • Planned completion fluid: 9.2 ppg SF OBM in Laterals, 9.2 ppg Brine, 6.8 ppg diesel in mother bore Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. 5 Permit to Drill 6-21-06 • • Drilling Hazards and Contingencies POST THIS NOTICE tN THE DOGHOUSE I. Well Control A. The Schrader in the target fault block is expected to be normal pressured at 8.3-8.6 ppg EMW. This pressure is estimated based on offset well pressures and material balance. II. Hydrates and Shallow gas A. Gas Hydrates are expected at L-pad from the SV5 thru the SV1 sands below the base of the permafrost. Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole. Recommended practices and precautions for drilling hydrates should be followed in the surface hole. Occasionally hydrates are encountered below the SV1. III. Lost Circulation/Breathing A. Lost circulation is not expected at fault #1. This fault has been penetrated by most wells drilled from L Pad. B. Breathing is not expected on this well. IV. Kick Tolerance/Integrity Testing Kick Tolerance / Inte ri Testin Summa Table Casing set / Maximum Influx Volume Mud Weight Exp Pore Press Min LOT /FIT Interval Surface / 9 7/8" 145 9.3 8.6 OBd 12.5 LOT Intermediate / 6-3/4" Infinite 9.3 8.6 (OBc) 11.5 (FIT for OBc lateral onl NOTE: All LOT /FIT will be taken with a minimum of 20-ft and a maximum of 50-ft of new hole drilled outside of the previous casing string An FIT will only be performed for the OBc lateral, not the OBd, OBb, OBa, or OA. L-Pad development wells may have "kick tolerances" in the 25 bbf range. A heightened awareness of kick detection, pre-job planning and trip tank calibration will be essential while drilling/tripping the intermediate/ roduction intervals. V. Hydrogen Sulfide L Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. No measurable H2S is being produced from the formation at this time. However 5 - 50 ppm is expected as a result of the use of Ivishak gas lift gas. All LV Pad gas lift wells will likely have H2S in this concentration. Note that all injection has been with produced water not seawater. H2S levels are expected to remain low until the waterflood matures. Recent H2S data from the pad is as follows: Adjacent producers at Surface: L-106 50 ppm L-102 20 ppm Adjacent producers at TD: L-201 10 ppm VI. Faults A. Two faults are expected to be crossed in L-204. No losses are expected to be associated with these faults. No faults are expected in the reservoir section, although sub seismic faults with throws <25' may be encountered. Fault Location MD TVDss Throw Direction Uncertainty Fault #1 - L Pad 965' -880 -30' West +/- 100' MD Fault Fault #2 - Ugnu M 5,276' -3890' -145' West +/- 100' MD Sand Interval 6 Permit to Drill 6-21-06 • • CONSULT THE PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION L-204, L-204 L1, L-204 L2, L-204 L3 & L-204 L4 DRILL AND COMPLETE PROCEDURE SUMMARY Pre-Riq Work: 1. A 34" x 20" insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and production simops. Drilling Riq Operations: 1. MIRU Nabors 9ES. Nipple up diverter spool and riser. Function test diverter. PU 4" DP and stand back in derrick. 2. MU 13-~/z" drilling assembly with MWD/GR and directionally drill surface hole to approximately 3449' MD. The actual surface hole TD will be +/-100' TVD below the top of the SV1 sand. 3. Run and cement the 10-3/a", 45.5#, K-55 BTC surface casing back to surface. ND drilling spool and riser and NU casing /tubing head. NU BOPE and test to-~;A86"psi. 3500 1~1G/tr 4. MU 9-'/e" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Ghost reamer t1,000'and 12,000' from the bit. RIH to float collar. Test the 10-3/a" casing to 2,500 psi for 30 minutes. 5. Drill out shoe track and displace the well to new 8.8 LSND drilling fluid. Drill 20' of new formation and perform a LOT. Directionally drill ahead to TD at ~ 6706'. (1185' MD below Top OBd). 6. MU and run 7 5/e", 29.7#, L-80, BTC-M, TC-II casing to TD. Cement in one stage to -4,450' MD (1000' MD from the surface casing shoe). Bump plug with seawater. 7. Clean pits for displacement. Freeze protect 7 5/8" x 10-3/0" annulus to 2,200' TVD. • L-204 OBc Lateral 8. PU 6-3/a" conventional assembly with MWD/GR/Res/Den /Neu/AIM/PWD and RIH to the float collar. Test the 7-b/8" casing to 3,500 psi for 30 minutes. 9. Displace well over to 9.2 ppg Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of new formation and perform FIT to 11.5 ppg EMW. 10. Directionally drill ahead to TD geo-steering through the OBc to TD at -11981' MD. Back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 11. POOH to near OBb window depth, log the top OBb (RA marker) with GR, log across the OBa and OA windows as well. POOH. 12. MU and run 4-%2" 12.6# L-80 BTC-M slotted liner with swell packer and Aluminum billet liner top. Position billet at 7,131'. POOH. • L-204L1, OBd Lateral 13. RIH with 6-3/a" sidetracking /drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to AI billet. Displace well over to 9.2 ppg Versapro MOBM. Time mill off billet to sidetrack. Directionally drill to the planned TD in the OBd. Back ream out of hole to shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 14. MU and run 4-~/z" 12.6# L-80 BTC-M slotted liner with liner hanger and liner top packer. Position TOL for OBb whipstock. POOH. • L-204L2, OBb Lateral 15. PU the 7 8/6" whipstock assembly. Set the whipstock on the OBd liner top packer such that the top of the window is near the top of the OBb sand. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.2 ppg Versapro MOBM. Mill window. POOH. 16. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TD of OBb lateral. Back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 17. Pull whipstock #1. Run and set 4-~/z" slotted liner and hook hanger. POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #1 with ZXP liner top packer, POOH. 7 Permit to Drill 6-21-06 • L-204L3. OBa Lateral 18. PU the 7 5/8" whipstock assembly. Set the whipstock on the OBb liner top packer such that the top of the window is near the top of the OBa sand. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.2 ppg Versapro MOBM. Mill window. POOH. 19. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TD of the OBa lateral. Back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 20. Pull whipstock #2. Run and set 4-'h" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #2 with ZXP liner top packer, POOH. :• L-204L4, OA Lateral 21. PU the 7-5/a" whipstock assembly. Set the whipstock on the OBa liner top packer such that the top of the window is near the top of the OA sand. Orient and set whipstock. Shear off of Whipstock. Displace well over to 9.2 ppg Versapro MOBM. Mill. window. POOH. 22. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TD of the OA lateral. Back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 23. Pull whipstock #3. Run 4-'/2" slotted liner and hook hanger, POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #3 with ZXP liner top packer. Clean pits for displacement. Displace mother bore over to 9.2 ppg KCL brine. POOH. 24. MU 4-'/z" 12.6# IBT-M, L-80 completion assembly and RIH. See completion schematic for details. Land tubing hanger and run in lockdown screws. 25. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK valve. 26. Install two-way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 27. Pull two-way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze protect the well to 2,200' TVD. Install VR plug in 7 5/e" casing annulus valves. 28. Install BPV. Secure the well and rig down /move off Nabors 9ES. Post-Riq Work: 1. MIRU slickline. Pull the ball and rod /RHC plug. 2. Pull out DCK shear valve, install GLV in all of the other mandrels as per the PE. 8 Permit to Drill 6-21-06 ~ ~ Variance Request Issue Compliance with AOGCC testing requirements for BOP rams after they have been used in the normal coarse of operations. Re uest The AOGCC is in the process of developing a guideline document clarifing the intent of the regulations pertaining to function pressure testing ram type BOP's. BPXA requests a variance to the provisions of 20 AAC 25.035 (e}(10)C regarding the function pressure test requirement after the use of BOP ram type equipment for other than well control or equivalent purposes, except when the routine use of BOP ram type equipment may have compromised their effectiveness. (Example would be when pipe rams are inadvertently closed on a tool joint during routine operations.) The activities associated with this request will not compromise the integrity of the BOP equipment. Background AOGCC regulations require rams that have been used in the course of primary drilling & completion, workover and through tubing drilling operations be function pressure tested before the next wellbore entry. This is not a new regulation. The intent of this regulation is to ensure that ram type equipment has integrity after it has been utilized in a wellbore...for example; to ensure integrity if a ram was closed on a tool joint. The exact regulation language is: "if BOP sealing ram type equipment has been used, it must be function pressure-tested, before the next wellbore entry, to the required working pressure specified in the approved Permit to Drill, using anon-compressible fluid, except that an annular type preventer need not be tested to more than 50 percent of its rated working pressure;" The pertinent sections are: 20 AAC 25.035 (e)(10}C PRIMARY DRILLING AND COMPLETION; 20 AAC 25.036 (d){4} THROUGH TUBING DRILLING AND COMPLETION; 20 AAC 25.285 (f)(2) TUBING WORKOVERS: 20 AAC 25.286(e)(i) WORKSTRING SERVICE OPERATIONS This issue has been discussed with Winton Aubert at the AOGCC. The test requirement in the regulation is intended to apply to ram type egui~ment only. The AOGCC understands that ram type BOP's are utilized for purposes other than well control in the normal coarse of operations. The regulations allowing a variance are at 20 AAC 25.035(h) PRIMARY DRILLING AND COMPLETION; 20 AAC 25.036(f) THROUGH TUBING DRILLING AND COMPLETION; 20 AAC 25.285(h) TUBING WORKOVERS; 20 AAC 25.286(8) WORKSTRING SERVICE OPERATIONS...which says generally: 20 AAC 25.035(h)... Upon request of the operator, the commission will, in its discretion, approve a variance (1) from the ROPE requirements in (e} of this section if the variance provides at least an equally effective means of well control; L-204, L1, L2, L3, & L4 PROPOSED COMPLETION TREE: FMC 4-1/16" SM WELLHEAD: FMC Gen 5 System 20" X 34" 215.5 Ib/ft, A53 ERW Insulated @ 109' 11", SM csg.head w/ 7" mandrel hanger 8 packoff 11" x 11", 5M, tbg spool w/ Halliburton X-Nipple (3.813" ID) @ 2200' TVD 11" x 4-1/2" tubing hanger with control line ports 11" X 4-1/16" Adaptor Flange 4-1/2", 12.6 ib/ft, L-80, BTC-M prig KB elev (N-9ES) _' Coupling OD: 5.2" DrifUID : 3.833"!3.958" 10-3/4", 45.5# K-55 BTC Csg @ 3,449' MD 4.5" Baker sliding sleeve with 3.813" ID @ GLM Desian: 7-5/8" X 5-1/2" Baker PRM Packer @ #4 -TBD' TVD - 4-1 /2" X 1" KBG-2 - SV #3 -TBD' TVD - 4-1/2" X 1" KBG-2 - DV Halliburton X-Nipples (3.813" ID) #2 - 4 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV 4.5" WLEG @ 5,800' MD #1 - 2 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV Phoenix Pressure ~ '- ~`- Gauge with control .. Versapro SFMOBM in each Lateral and in mother bore from tbg tail down. lines to surface 6-314" OA Lateral 5,876'-11,921' RA Tag TBD _ _, _ ~~;, Swell packer placement TBD Junction Specifications: / ` 6-314" OBa Lateral 6,017'-11,947' Junction ID through LEM Module without diverter: 3.68" RA Tag TBD - - LEM run with internal sealbores - - - - - '"" to allow the use of isolation " sleeve across window. Swell packer placement TBD f Baker Hughes Hookwall Hanger Window in 7-5/8" casing Well Inclination @ Window = ° Baker Hughes Hookwall Hanger W ndow in 7-518" casing Well Inclination @ Window = Baker Hughes Hookwall Hanger Window in 7-5/8" casing Well inclination @ Window iZ4 Tag TBD RA Tag TBD 5/8", 29.7#, L-80, ti I L-M (W ti /06 Casing Drift: 6.75" Casing ID: 6.875" 6.314" OBb Lateral 6,122'-11,961' Solid Liner 7,131 11 981' ' ' °' - 1.i ~1i Swell packer placement TBD _ _ Aluminum ~ OBC Lateral Btllet ~ `° ~ tad 6-3/4" OBd Lateral 6706'-11,976' DATE REV. BY COMMENTS /j f ~ ~ ~ ~ Sf31/2006 sRK Level 3Multi-Lateral, 4-i12° GL Completlo~ / ~~`~ r ~~ "~Y ~~ API NO: 50-029- so-o29- ORION 50-029- WELL: L-204 ML 50-029- ~ PLANT - N~1s•ee•ee° GRID I I I I i I I I I I I I I i L-PAD ^ N-L (NWE-1) ~O ~~ L-1111 ^ - ~ N-A (NWE 2) ^ L-2181 L-114 ^ ^ L-124 1-50 ^ ~ L-1121 L-02 L-121 ^ ^ L-1231 ^ L-122 L-110 ^ ^ L-2111 L-SI ^ ^ L-1151 L-116 ^ ^ L-117 L-109 ^ ^ 1-118 L-SL ^ ^ 1-250 L-01 ^ ^ 1-200 L-107 ^ ^ L-202 L-03 ^ X10 ~~ ^ L-212f i i I I 1 i I I I I I I I I I I I 1 I I I I 1 I I I I I I/ ^ L-SPARE L-2131 ^ ~ ^ L-203 L-1081 ^ ~ ^ L-2161 ~ L-1051^ ~ ^ L-1031 I L-106 ^ ~ ^ L-2151 L-204 • ^ L-201 L-104 ^ ^ L-1191 I 1-214i^ ^ L-2101 L-102 ^ ^ L-120 ^~ 1 I I I I I I sK io sas sKio su i /~// _, 34 35 - =.N L-PAD ~ PRO,~CT T12N AREA T11N w r_ , .. ,- 3 2 [':- . ~ VICINITY MAP N.T.S. YYGLL IV V. L-LYJ 9' ICCVIJI VIV IVV IC THIS AS-BUILT DRAWING IS A RE-ISSUE OF A PREVIOUS CONDUCTOR AS-BUILT FOR WELL L-1231 DATED 8/29/2004. WELL L-1231 WAS RENAMED AS SLOT L-SU ON 12/11/2005 AND IS NOW BEING RENAMED TO WELL L-204. qV`q b ~P~EoOF> L GJ~ ~_, 1 ~0°49~ ~ ~e~ '~, as Leonard J. ~0'Hanley ~ ~ 11386 ,~ ~~' 'ssia~w- `°~ SURVEYOR'S CERTIFICATE. I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF AUGUST 26, 2004 LEGEND NOTES RENAMED CONDUCTOR 1. DATE OF SURVEY: AUGUST 26-27, 2004. 2. REFERENCE FIELD BOOK: W004-11 PAGES 54-59. ^ EXISTING CONDUCTOR 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD 27. 4. BASIS OF HORIZONTAL LOCATION IS OPERATOR MONUMENTS, WOA L-PAD MONUMENTATION. 5. BASIS OF ELEVATION IS OPERATOR MONUMENTS PER F.R. BELL & ASSOCIATES. ELEVATIONS ARE BPX MEAN SEA LEVEL DATUM. 6. MEAN PAD SCALE FACTOR IS 0.999907827. LOCATED WITHIN PROTRACTED SEC. 34, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION N0. COORDINATES COORDINATE POSITION DMS POSITION D.DO BOX ELEV. OFFSETS L-204 = 5,978,146.73 N 9,819.88 70'21'00.936" 70.3502600' 50 1' 2,423' FSL ' = 583,371.74 E 5,339.90 149'19'23.212" 149.3231144' . 3,544 FEL by 1~~ ~~ WoL „-02 WOA L-PAD WtJI!J1JlJ JOB NP. o sc,~ : CONDUCTOR AS-BUILT °°'m""°'"°'""'°° WELL L-204 .~.m ...® uK 1"~ 150' SHEET: 1BV1 ap r gad Schlumberger L-204L1 (P1) Proposal CIieM: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure/Slot: Well: L-PAD/S-U ~~'~~ Plan L-204 (S-U) Borehole: ~~~ Plan L-204L1 OBd B UVVIIAPI#. 50029 Survey Name 1 Date: L-204L1 (P1) /May 8, 2006 Tort I AHD 1 DDI 1 ERD ratio: 172.674° / 9580.07 ft / 6.620 / 2.017 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feel Location LaULong: N 70.35026009, W 149.32311435 Location Grid NIE YIX: N 5978146.730 ftUS, E 583371.740 ftUS Grid Convergence Angle: +0.63747117° Vertical Section Azimuth: 104.910° V Vertical Section Origin: TVD Reference Datum: S 0.003 ft, W 0.001 ft Rotary Table TVD Reference Elevation: 78.60 ft relative to MSL Sea Bed /Ground Level Elevation: 50.10 ft relative to MSL Magnetic Declination: 24.168° Total Field Strength: 57579.516 nT Magnetic Dip: 80.858° Declination Date: July 15, 2006 Magnetic Declination Model: BGGM 2005 North Reference: True North Total Corr Mag North •> True North: +24.168 ° Local Coordinates Referenced To: Well Head • Comments Measured Inclination Azimuth Sub-Sea TVD TVD Verticel NS EW DLS Tool Face Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section ft d d ft ft ft ft ft d 100 ft d de 100 ft d 100 ft ftUS ftUS IIVY I.fV b/lUU /~I JU.tltl `JU.VU -IU/.lV 4b2)U.UU 4b3tl.gV 4U25U.Jb -17253.by 4bb1.325 1./b yt5.11 Ci 1.125 -1.Y0 5y//510,UU b2f25U4U.UU N/U.J4253tlt53b VV 14y.1tfb1//14 7150.00 89.84 108.24 4560.03 4638.63 4699.45 -689.50 4679.60 6.00 98.11 G -0.85 5.94 5977509.40 588058.28 N 70.34837246 W 149.28512926 7200.00 89.42 111.21 4560.35 4638.95 4749.27 -706.37 4726.66 6.00 98.09G -0.85 5.94 5977493.06 588105.52 N 70.34832629 W 149.28474735 7250.00 88.99 114.18 4561.05 4639.65 4798.80 -725.65 4772.78 6.00 98.05G -0.84 5.94 5977474.29 588151.85 N 70.34827353 W 149.28437309 7300.00 88.58 117.15 4562.11 4640.71 4847.91 -747.30 4817.84 6.00 97.99G -0.84 5.94 5977453.15 588197.14 N 70.34821432 W 149.28400750 End Crv 7338.24 88.26 119.42 4563.16 4641.76 4885.09 -765.41 4851.49 6.00 O.OOG -0.83 5.94 5977435.41 588230.99 N 70.34816478 W 149.28373441 Crv 10/100 8135.67 88.26 119.42 4587.40 4666.00 5656.72 -1156.94 5545.76 0.00 -86.61 G 0.00 0.00 5977051.67 588929.51 N 70.34709384 W 149.27810133 8150.00 88.34 117.99 4587.83 4666.43 5670.64 -1163.82 5558.33 10.00 -86.57G 0.59 -9.99 5977044.92 588942.15 N 70.34707501 W 149.27799938 8200.00 88.65 113.00 4589.14 4667.74 5719.76 -1185.33 5603.43 10.00 -86.44G 0.61 -9.98 5977023.92 588987.48 N 70.34701617 W 149.27763343 L-204L1 OBd Tgt 3 8240.04 88.90 109.00 4590.00 4668.60 5759.55 -1199.67 5640.79 10.00 -86.21 G 0.63 -9.98 5977010.00 589025.00 N 70.34697691 W 149.27733024 8250.00 88.97 108.01 4590.19 4668.79 5769.49 -1202.83 5650.24 10.00 -86.19G 0.66 -9.98 5977006.95 589034.48 N 70.34696826 W 149.277 61 8300.00 89.30 103.02 4590.94 4669.54 5819.47 -1216.20 5698.40 10.00 -86.11 G 0.67 -9.98 5976994.12 589082.78 N 70.34693164 W 149.27 2 End Crv 8330.12 89.51 100.01 4591.25 4669.85 5849.53 -1222.21 5727.90 10.00 O.OOG 0.68 -9.98 5976988.44 589112.35 N 70.34691516 W 149.27 4 Crv 10/100 9333.77 89.51 100.01 4599.89 4678.49 6849.47 -1396.68 6716.23 0.00 98.10G 0.00 0.00 5976824.98 590102.46 N 70.34643627 W 149.26860276 9350.00 89.28 101.62 4600.06 4678.66 6865.66 -1399.73 6732.18 10.00 98.09G -1.41 9.90 5976822.12 590118.44 N 70.34642791 W 149.26847340 9400.00 88.58 106.57 4601.00 4679.60 6915.63 -1411.90 6780.65 10.00 97.99G -1.40 9.90 5976810.49 590167.04 N 70.34639455 W 149.26808008 L-204L1 OBd Tgt 4 9434.62 88.10 110.00 4602.00 4680.60 6950.17 -1422.75 6813.50 10.00 97.64G -1.38 9.91 5976800.00 590200.00 N 70.34636481 W 149.26781355 9450.00 87.90 111.53 4602.54 4681.14 6965.46 -1428.20 6827.87 10.00 97.58G -1.32 9.92 5976794.71 590214.43 N 70.34634989 W 149.26769690 9500.00 87.25 116.49 4604.66 4683.26 7014.77 -1448.52 6873.49 10.00 97.37G -1.30 9.92 5976774.90 590260.27 N 70.34629427 W 149.26732679 End Crv 9542.01 86.71 120.66 4606.87 4685.47 7055.53 -1468.58 6910.32 10.00 O.OOG -1.26 9.93 5976755.26 590297.32 N 70.34623938 W 149.26702801 Crv 10/100 10356.95 86.71 120.66 4653.59 4732.19 7838.58 -1883.47 7610.19 0.00 -48.14G 0.00 0.00 5976348.21 591001.69 N 70.34510407 W 149.26135112 10400.00 89.59 117.46 4654.98 4733.58 7880.29 -1904.36 7647.79 10.00 -48.03G 6.68 -7.44 5976327.74 591039.52 N 70.34504689 W 149.26104610 L-204L1 OBd Tgt 5 10406.13 90.00 117.00 4655.00 4733.60 7886.28 -1907.17 7653.24 10.00 -90.OOG 6.69 -7.44 5976325.00 591045.00 N 70.34503922 W 149.26100192 WeIlDesign Ver SP 1.0 Bld(doc40x_56) S-U\Plan L-204 (S-U)\Plan L-204L1 OBd\L-204L1 (P1) Generated 5/8/2006 10:16 AM Page 1 of 2 Measured Vertical Comments inclination Azimuth Sub-Sea TVD TVD NS EW DLS Tool Face Build Rate Walk Rate Northing Easting Latitude Longitude Depth Section ft de de ft ft ft ft ft de 100 ft de de 100 ft de 100 ft ftUS ftUS tnd C:rv 'IU4;iU.yy yU.UU 114.51 41i55.UU 4/J:i.tiU /y1 U./U -'ly1/.y/ /ti/5.ti:S 'IU.UU U.000i U.UU -1U.UU by/ti:i14.45 5y'IU(i/.51 N /U.;i45UUy(i4 W 14y.2(iU82U27 Crv 10/100 11360.57 90.00 114.51 4655.00 4733.60 8827.25 -2303.66 8521.42 0.00 -90.OOG 0.00 0.00 5975938.23 591917.46 N 70. 34395348 W 149.25395955 L-204L1 OBd Tgt 6 11395.71 90.00 111.00 4655.00 4733.60 8862.05 -2317.25 8553.82 10.00 -98.54G 0.00 -10.00 5975925.00 591950.00 N 70. 34391625 W 149.25369678 11400.00 89.94 110.58 4655.00 4733.60 8866.32 -2318.77 8557.83 10.00 -98.54G -1.48 -9.89 5975923.52 591954.03 N 70. 34391208 W 149.25366421 11450.00 89.20 105.63 4655.38 4733.98 8916.23 -2334.30 8605.34 10.00 -98.50G -1.48 -9.89 5975908.52 592001.71 N 70. 34386950 W 149.25327880 11500.00 88.46 100.68 4656.41 4735.01 8966.18 -2345.68 8654.00 10.00 -98.40G -1.47 -9.89 5975897.69 592050.49 N 70. 34383827 W 149.25288400 End Crv 11506.62 88.36 100.03 4656.59 4735.19 8972.78 -2346.87 8660.51 10.00 O.OOG -1.46 -9.90 5975896.57 592057.01 N 70. 34383500 W 149.25283117 TD / 4-1/2" Lnr 11976.14 88.36 100.03 4670.00 4748.60 9440.40 -2428.60 9122.67 0.00 O.OOG 0.00 0.00 5975820.00 592520.00 N 70.34361024 W 149.24908144 • WeIlDesign Ver SP 1.0 Bld( doc40x_56) S-U\Plan L-204 (S-U)\Plan L-204L1 OBd\L-204L1 (P1) Generated 5/8/2006 10:16 AM Page 2 of 2 ~p Schlumberger WELL Fi[:lp SigUGiUNE L-204L1 (P1) Prudhoe Bay Unit - WOA L-PAD MaJrellc VaremMn,s SuRaw Lau~lun NAU1]AbxAn Shla Pl.uxn. ZUyn Od. US Furl MH'+:alWiwus MyOal-. UGGM )005 Oy. tl0 tl'.A' Uae. JWy 15. 1006 Le, NIOII °Y3H 'HItl14L IIUS GnJ (;urrv •°OJldiI Vl' SIW. S-U NU11d. Ndary lade i)tl GUM1 aWve MSLi May Uw; •Zd IHtl 5151y5nI kon Wld`J tY2:i 11/ k,aastl.ryy 'AJ!!1 ld IIUti SuWV:H10: }J}J01H!)ti VLrn L104lt iV'li nY Uda MaYIIP ZI%IE 4800 5400 6000 6600 7200 7800 8400 9000 9600 4200 0 0 c 0) ~ 4800 H l-2 c L-204 (P.3) O c ..~.. ' End Crv Civ 1bHD End Cdrv ;Crv 101100 E d Crv ~ ~ • KOP Crv W100 L-7,114L1 OBd T t 3 L-TD4L1 OBd T t 4 Crv 10/100 End Crv 0 9 End Crv Crv 101100 L-204L1 Oed Tgt 5 TD 141/2" Lnr L•204L1 OBd Tgt 6 4200 4800 • 4800 5400 6000 6600 7200 7800 8400 9000 9600 Vertical Section (ft) Azim = 104.91°, Scale = 1(in):600(ft) Origin = -0.00285079 N/-S, -0.000856544 E/-V by Schlumberger WEL` L-204L1 (P1) `~E"' Prudhoe Bay Unit - WOA HIRD,.IDRf L-PAD Ma3nNC Paiamelers e...lc. NA02]Naska tilxle Pknns.2w~n W. US FnaI 6 ~ MwMWneuu. MWlI 84[:M 2WS Ury ~ Dale July i6. 2066 lal NI6210936 Nunltllly. Sy]H1d6lJ IIUS 4nH (;wrv .063]4)11)' Sbf. 5-U 1VD Rnl. RMaiy TaNn l)tl fiO HaWVe MSLI May Uee d tiH' FS'. 5]6]9'v nT lun. W1d919232t2 Eacuiy ubfnD. 6.999W]H96 Plan. L-209LIIP 11 Srvy Dale May OH. 2006 -600 n A n Z o -1200 O C N U to -1800 V V V -2400 ?00 4800 5400 6000 6600 7200 7800 8400 9000 7-SIB" Csg Pt N c KOP;Crv 5!700 ..........~. .....................: ......End Crv ..................:.................................. ~................................. ~..................................1..................................:. ........................... ............. .......... I ..........~ ..................................' crv7onoo Crv 101100 L•204L1 OBO T9t 4 L-204L7 pBd Tgt 3 End Crvi End Crv Crv 1Q/700 L-204L7 OBd Tgt 5 nd Crv I Crv 701100 L-204L1 OBd Tgt 5: End Crv 76/4-7/2" Lnr L-204 (P3) PBc L-2041 (Pi) -600 -1200 -1800 -2400 ?00 4800 5400 6000 6600 7200 7800 8400 9000 «< W Scale = 1(in):600(ft) E »> BP Alaska Anticollision Report Company: BP Amoco Date: 5/8/2006 'Cime: 10:38:27. ` Yage: 1 ', Field: Prudhoe Bay Reference Site: PB L Pad Co-~~rdinate(NE) Reference: Well: Plan L-204 (S-U), True North Reference Well: Plan L-204 (S-U) Vertical (TVD) Reference: L-204 Plan S-U 78.6 Reference Wellpath; Plan L-204L1 OBd Db: Oracle NO GLOBAL SCAN: Using user defined selection & scan criteria Reference: Prlnclpal Plan ?3< PLANNED PROGRAM Interpolation Method: MD + Stations Interval: 5.00 ft Error Model: ISCWSA Ellipse ', Depth Range: 7130.88 to 11976.14 ft Scan Method: Trav Cylinder North Maximum Radius:10000.00 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 5/8/2006 Validated: No Version: 1 Planned From To Survey Toolcode Tool Name ft ft 28.50 700.00 Planned: Plan #3 V1 (0) GYD-GC-SS Gyrodata gyro single shots ', 700.00 7130.88 Planned: Plan #3 V1 (0) MWD+IFR+MS MWD +IFR + Multi Station 7130.88 11976.14 Planned: Plan #1 V1 MWD+IFR+MS MWD +IFR + Multi Station ', ~i Casing Points MD TVD Diameter Hole-Size Name I ft ft in in , - ~', 3223.42 2648.60 10.750 13.500 10 3/4" _ __ ', 6705.66 4628.60 7.625 9.875 7-5/8" 11976.14 4748.60 4.500 6.750 4 1 /2" Summary -- _ _ -- - <--------- , -------- Offset Wellpath -- _ _. -----------> _ ~~ .r ~ Reference Offset Ctr-Ctc No-Go Allowable ' ;Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft PB L Pad L-01 L-01 V14 Out of range PB L Pad L-02 L-02 V1 Out of range PB L Pad L-02 L-02A V5 Out of range PB L Pad L-02 L-02APB1 V2 Out of range ', , PB L Pad L-02 L-02PB1 V21 Out of range ', PB L Pad L-03 L-03 V5 7132.43 7845.00 834.12 77.06 757.06 Pass: Major Risk ', PB L Pad L-101 L-101 V4 Out of range ', ', PB L Pad L-102 L-102 V2 7131.08 7160.00 949.13 223.13 726.00 Pass: Major Risk '; PB L Pad L-102 L-102P61 V10 Out of range PB L Pad L-102 L-102P62 V2 Out of range ', PB L Pad L-103 L-103 V23 7131.38 9205.00 2573.01 126.01 2447.01 Pass: Major Risk ' ', PB L Pad L-104 L-104 V7 7132.14 7270.00 219.39 178.02 41.36 Pass: Major Risk PB L Pad L-105 L-105 V4 Out of range ', PB L Pad L-106 L-106 V14 Out of range ', PB L Pad L-107 L-107 V14 Out of range PB L Pad L-108 L-108 V18 Out of range PB L Pad L-109 L-109 V12 Out of range PB L Pad L-110 L-110 V11 Out of range ~, PB L Pad L-111 L-111 V24 Out of range 'i PB L Pad L-112 L-112 V8 Out of range PB L Pad L-114 L-114 V15 Out of range ~ PB L Pad L-114 L-114A V4 Out of range PB L Pad L-115 L-115 V7 Out of range PB L Pad L-116 L-116 V10 Out of range PB L Pad L-117 L-117 V11 Out of range PB L Pad L-118 L-118 V9 Out of range ', PB L Pad L-119 L-119 V9 Out of range PB L Pad L-120 L-120 V8 Out of range ', PB L Pad L-121 L-121 V14 Out of range ', PB L Pad L-121 L-121A V1 Out of range ', PB L Pad L-122 L-122 V5 Out of range PB L Pad L-123 L-123 V5 Out of range PB L Pad L-123 L-123P61 V3 Out of range I L PB L Pad L-124 L-124 V13 Out of range I PB L Pad L-124 L-124P61 V5 Out of range ', PB L Pad L-124 L-124P62 V4 Out of range PB L Pad L-200 L-200 V7 Out of range PB L Pad L-200 L-200L1 V3 Out of range ', PB L Pad L-200 L-200L2 V6 Out of range PB L Pad L-201 L-201 V6 10501.04 13695.00 1106.18 282.19 823.99 Pass: Major Risk PB L Pad L-201 L-201 L1 V9 10308.34 13540.00 1027.63 283.82 743.81 Pass: Major Risk BP Alaska Anticollision Report "' Company: BP Amoco Date: 5!$/2006 Time: 10:38:27 Page: 2 , Field: Prudhoe Bay i Reference Site: PB L Pad Co-0rdinate(NF,) Reference: Well: Plart L-204 (S- U), True North Reference V1'cll: Pian L-204 (S-U) Vertical (TVD) Reference: L-204 Pl an. S-l! 78.6 ~ Reference Wellpath: P{ap L-204L1 OBd I Db: Oracle Summary <--------------- Offset Wellpath -------------> Reference Offset Ctr-Ctr ISo-Go Allowable ~ ~~, i 5ite Well Wellpath MD MIJ Distance Area Deviation Warning ft ft ft ft ft PB L Pad L-201 L-201 L1 P61 V10 9350.00 12170.00 1238.16 270.24 967.92 Pass: Major Risk PB L Pad L-201 L-201 L2 V5 10305.98 13490.00 1065.00 305.15 759.86 Pass: Major Risk I, PB L Pad L-201 L-201 L3 V2 Out of range ', PB L Pad L-201 L-201 L3PB1 V6 Out of range PB L Pad L-201 L-201 P61 V12 Out of range ', PB L Pad L-201 L-201 PB2 V3 9370.13 12325.00 1219.77 267.36 952.41 Pass: Major Risk PB L Pad L-202 L-202 V5 7130.88 10835.00 3667.22 231.92 3435.30 Pass: Major Risk PB L Pad L-202 L-202L1 V7 7130.88 10825.00 3689.99 217.92 3472.06 Pass: Major Risk PB L Pad L-202 L-202L2 V6 7130.88 10820.00 3761.17 218.66 3542.50 Pass: Major Risk PB L Pad L-202 L-202L3 V6 Out of range PB L Pad L-210 L-210 V6 7130.88 7005.00 2062.77 201.91 1860.85 Pass: Major Risk PB L Pad L-210 L-210P61 V8 7130.88 7130.00 2363.66 209.15 2154.50 Pass: Major Risk PB L Pad L-211 L-211 V6 Out of range PB L Pad L-211 L-211 PB1 V6 Out of range PB L Pad L-212 L-212 V11 Out of range ', PB L Pad L-212 L-212PB1 V9 Out of range PB L Pad L-212 L-212P62 V2 Out of range PB L Pad L-213 L-213 V8 Out of range PB L Pad L-214 L-214 V9 7174.58 6850.00 962.71 207.01 755.70 Pass: Major Risk ', PB L Pad L-214 L-214A V4 7200.00 7005.00 986.68 266.28 720.40 Pass: Major Risk ', PB L Pad L-215 L-215 V7 Out of range ', PB L Pad L-215 L-215P61 V4 Out of range PB L Pad ~ L-215 L-215P62 V2 7130.88 11260.00 7502.78 199.41 7303.37 Pass: Major Risk I PB L Pad L-216 L-216 V6 Out of range '~ PB L Pad L-218 L-218 V4 Out of range ', PB L Pad L-250 L-250 V4 Out of range PB L Pad L-250 L-250L1 V14 Out of range PB L Pad L-250 L-250L2 V10 7130.88 11605.00 3347.19 230.28 3116.91 Pass: Major Risk ', PB L Pad L-250 L-250PB1 V3 Out of range ', j PB L Pad L-50 L-50 V1 Out of range PB L Pad L-50 L-50P61 V4 Out of range PB L Pad NWE1-01 L-100 V2 Out of range ~, PB L Pad NWE1-01 NWE1-01 VS Out of range PB L Pad Plan L-04 (S-L) Plan L-04 V3 Plan: Pla Out of range '~ PB L Pad Plan L-204 (S-U) Plan L-204 OBc V3 Plan 13131.09 7130.00 0.00 0.47 -0.47 FAIL: NOERRORS ', PB L Pad Plan L-217 (N-P) Plan L-217 V2 Plan: PI Out of range PB L Pad Plan L-51 (S-B) Plan L-51 V3 Plan: Pla Out of range ~, PB L Pad Plan L-52 (S-E) Pian L-52 V1 Plan: Pla Out of range ', ' PB V Pad Plan V-121 (S-R) Plan V-121 V1 Plan: PI 11974.61 2770.00 5821.30 190.20 5631.10 Pass: Major Risk PB V Pad Plan V-122 (S-U) Plan V-122 V1 Plan: PI 11976.47 2480.00 6390.61 192.91 6197.70 Pass: Major Risk ', PB V Pad Plan V-122 (S-U) Plan V-122P61 V2 Plan: 11976.47 2480.00 6390.61 192.93 6197.69 Pass: Major Risk PB V Pad Plan V-205 (S-P) Plan V-205 V2 Plan: PI 11450.00 1120.00 7295.20 165.95 7129.25 Pass: Major Risk PB V Pad Plan V-206 (S-S) Plan V-206 V1 Plan: PI 11476.66 1150.00 7267.51 166.34 7101.17 Pass: Major Risk '~ PB V Pad V-01 V-01 V15 11474.14 1405.00 7202.09 168.73 7033.36 Pass: Major Risk ', PB V Pad V-02 V-02 V12 11450.00 4795.00 6095.54 185.33 5910.21 Pass: Major Risk ~I PB V Pad V-03 V-03 V7 11975.74 5805.00 5271.54 201.20 5070.33 Pass: Major Risk ', PB V Pad V-100 V-100 V7 11976.18 4450.00 5822.50 224.01 5598.48 Pass: Major Risk ', PB V Pad V-101 V-101 V7 8200.00 7035.00 5747.91 218.41 5529.49 Pass: Major Risk ', 'i PB V Pad V-102 V-102 V5 8781.51 7645.00 2702.62 180.13 2522.49 Pass: Major Risk ', PB V Pad V-103 V-103 V6 11977.02 7665.00 517.54 206.04 311.51 Pass: Major Risk ', ~, PB V Pad V-104 V-104 V13 8250.00 7250.00 5230.63 200.04 5030.59 Pass: Major Risk PB V Pad V-105 V-105 V13 11450.00 6850.00 3145.85 191.04 2954.80 Pass: Major Risk ', ', PB V Pad V-106 V-106 V10 11723.10 7880.00 1041.59 183.60 858.00 Pass: Major Risk i ', PB V Pad V-106 V-106A V9 11288.08 7925.00 2083.88 166.38 1917.50 Pass: Major Risk ~I PB V Pad V-106 V-106APB1 V6 11288.08 7925.00 2083.88 166.40 1917.48 Pass: Major Risk ' ~I PB V Pad V-106 V-106AP62 V2 11288.08 7925.00 2083.88 166.38 1917.50 Pass: Major Risk ', PB V Pad V-106 V-106APB3 V2 11288.08 7925.00 2083.88 166.38 1917.50 Pass: Major Risk ', PB V Pad V-107 V-107 V5 11350.41 5245.00 5626.53 195.88 5430.66 Pass: Major Risk ~! PB V Pad V-108 V-108 V7 11395.71 2455.00 6816.68 185.56 6631.12 Pass: Major Risk !~ PB V Pad V-109 V-109 V2 11974.65 4375.00 5621.86 204.98 5416.88 Pass: Major Risk PB V Pad V-109 V-109P61 V5 11974.65 4375.00 5621.86 204.97 5416.89 Pass: Major Risk ', PB V Pad V-109 V-109P62 V2 11974.65 4375.00 5621.86 204.98 5416.88 Pass: Major Risk PB V Pad V-111 V-111 V25 11975.07 7430.00 5037.58 193.74 4843.84 Pass: Major Risk BP Alaska Anticollision Report Company: BP AnloCo Meld: < Prudhoe Bay Reference Site: ` PB L Pad Keference Well: Plan L-204 (S-U) Reference Wellpath Plan h204L1 OBd Summary Date: 5!8/2006 Co-ordinate(NE) Reference: Vertical ('PVp)12eferenee: -- -- Offset Wellpath -- Site Well.. Wellpath PB VPad V-111 V-111 P61 V8 PB V Pad V-111 V-111 P62 V2 PB V Pad V-111 V-111 P63 V6 PB V Pad V-112 V-112 V7 PB V Pad V-113 V-113 V6 PB V Pad V-114 V-114 V5 PB V Pad V-114 V-114A V4 PB V Pad V-114 V-114AP61 V4 PB V Pad V-114 V-114APB2 V2 PB V Pad V-115 V-115 V5 PB V Pad V-115 V-115P61 V4 PB V Pad V-117 V-117 V9 PB V Pad V-117 V-117P61 V6 PB V Pad V-117 V-117PB2 V6 PB V Pad V-119 V-119 V13 PB V Pad V-120 V-120 V5 PB V Pad V-201 V-201 V8 PB V Pad V-202 V-202 V9 PB V Pad V-202 V-202L1 VS PB V Pad V-202 V-202L2 V5 PB V Pad V-203 V-203 V18 PB V Pad V-203 V-203L1 V6 PB V Pad V-203 V-203L2 V4 PB V Pad V-203 V-203L3 V3 PB V Pad V-203 V-203L4 V3 PB V Pad V-204 V-204 V2 PB V Pad V-204 V-204L1 V2 PB V Pad V-204 V-204L1 PB1 V6 PB V Pad V-204 V-204L2 V2 PB V Pad V-204 V-204L2P61 V5 PB V Pad V-204 V-204L3 V3 PB V Pad V-204 V-204PB1 V9 PB V Pad V-204 V-204PB2 V2 PB V Pad V-210 V-210 V9 PB V Pad V-211 V-211 V5 PB V Pad V-212 V-212 V7 PB V Pad V-213 V-213 V5 PB V Pad V-213 V-213PB1 V5 PB V Pad V-214 Plan V-214 V1 Plan: PI PB V Pad V-214 V-214PB1 V2 PB V Pad V-214 V-214PB2 V3 PB V Pad V-214 V-214P63 V5 PB V Pad V-214 V-214PB4 V2 PB V Pad V-216 V-216 V8 PB V Pad V-221 V-221 V6 Reference Offset MD MD ft ft 11916.41 7635.00 11546.27 7210.00 11976.29 7460.00 10716.97 5210.00 8300.00 6030.00 11450.00 1445.00 11450.00 1445.00 11450.00 1445.00 11450.00 1445.00 11975.22 2685.00 11975.22 2685.00 11848.09 2175.00 11848.09 2175.00 11848.09 2175.00 11450.00 1790.00 11975.76 3960.00 11395.71 5270.00 10561.29 8985.00 10596.72 8985.00 10541.49 8965.00 7883.90 10620.00 7780.12 10620.00 7846.37 10605.00 7868.37 10595.00 7844.08 10590.00 11975.82 6535.00 11976.03 6350.00 11976.03 6350.00 11976.55 6730.00 11897.94 6445.00 11976.79 6590.00 11976.64 6515.00 11975.82 6535.00 8736.22 8280.00 8250.00 6440.00 11976.43 3075.00 11974.77 3435.00 11974.77 3435.00 8431.06 7420.00 11450.00 1005.00 8368.18 7380.00 8704.74 6195.00 10356.95 5335.00 11450.00 6800.00 11976.06 6240.00 "time: 10:38:27 Page: 3 Well: Plan L-204 (S-U), True North L-204 Plan S-U 78.6 Db: Oracle Ctr-Ctr No-Go Distance Area ft ft 5017.51 193.97 5183.70 184.52 5049.40 193.50 6123.80 195.67 6435.27 202.43 7316.14 169.54 7316.14 169.54 7316.14 169.54 7316.14 169.54 6526.08 192.95 6526.09 192.95 6983.60 189.01 6983.60 189.01 6983.60 189.01 7089.89 173.96 4076.47 177.02 4934.98 197.68 834.08 194.60 853.19 187.33 901.58 182.14 903.32 221.15 907.99 920.78 925.99 950.57 239.32 4505.26 216.17 4751.89 214.13 4751.89 214.13 4241.53 215.58 4514.54 211.76 4418.83 212.39 4528.34 216.49 4505.26 216.17 743.14 184.16 4078.83 205.57 5511.85 191.23 4958.58 186.65 4958.58 186.65 2522.05 184.69 7052.28 164.64 2612.41 189.86 3077.52 172.23 3598.90 181.72 1567.71 197.92 1952.41 164.68 Allo~~able Deviation Warning ft 4823.54 Pass: Major Risk 4999.19 Pass: Major Risk 4855.90 Pass: Major Risk 5928.13 Pass: Major Risk 6232.84 Pass: Major Risk 7146.60 Pass: Major Risk 7146.60 Pass: Major Risk 7146.60 Pass: Major Risk 7146.60 Pass: Major Risk 6333.13 Pass: Major Risk 6333.13 Pass: Major Risk 6794.59 Pass: Major Risk 6794.59 Pass: Major Risk 6794.59 Pass: Major Risk 6915.93 Pass: Major Risk 3899.45 Pass: Major Risk 4737.30 Pass: Major Risk 639.48 Pass: Major Risk 665.86 Pass: Major Risk 719.44 Pass: Major Risk 682.17 Pass: Major Risk No Offset Errors No Offset Errors No Offset Errors 711.24 Pass: Major Risk 4289.09 Pass: Major Risk 4537.76 Pass: Major Risk 4537.76 Pass: Major Risk 4025.96 Pass: Major Risk 4302.78 Pass: Major Risk 4206.44 Pass: Major Risk 4311.85 Pass: Major Risk 4289.09 Pass: Major Risk 558.98 Pass: Major Risk 3873.27 Pass: Major Risk 5320.61 Pass: Major Risk 4771.93 Pass: Major Risk 4771.93 Pass: Major Risk 2337.36 Pass: Major Risk 6887.63 Pass: Major Risk 2422.56 Pass: Major Risk 2905.28 Pass: Major Risk 3417.18 Pass: Major Risk 1369.79 Pass: Major Risk 1787.73 Pass: Major Risk 6 ~', Field: Prudhoe Bay ', Site: PB L Pad Well: Plan L-204 (S-U) Wellpath: Plan L-204L1 OBd ', n I too -o loo 77avelling Cylinder Azimuth (TFOfAZl) [deg[ vs Centre to Centre Separation [IOOftJin] • • TRANSMITTAL LETTER CHECKLIST WELL NAME ~~'~ L,. " ~' ~}' ~~ PTD# _ 2oti-- ~~ 9'_ ~ cT~v Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) ~ APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing wel l ~~,~ ~. "' 2 G ~ , (If last two digits in API number a permit No.2o - 0 2, , API No. 50- 62 - Z 3, r~ - o c. re between 60-69) j Production should continue to be reported as a function of the ~ original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. _(Company Name) must contact the Commission to obtain advance approval of such water well testing rogram. Rev: I /25106 C:\jody\transmittal checklist -_ ~ 4"rcLL t't'~ '"t~T CNEC~LE,~T Field 8 Pcol PRUDHOE t3AY, ORIGN SGHFt BL OIL - 640135 Weil Na~F PRUDHOE 8AY UN GRIN L 204L1 Program DEV _ .Well bore seg PTD# lU~~~93ri " ~~~pany BP EXPLvKH. ~0[~ ;~ " "'%CFl~ ING _ irnnal C'~~ ~'" ue DEV I 1-GIL lreu~re~~ unit GniCiif Snrre On Annular Disposal Administration 1 Permit fee attached No A P'cRMIT fEE iS NUT REQUIRED FOR THIS ! 2 Lease nurr~Ue~upprcpriate_ _ _ Yes iviULTI-LATTERA'. Unique weli_name znd numbsr Yes ,; `'Jell located in a defined peel Yes 5 'Nell iucated proper distance_from drilling unit_boundary Yes '6 uvell located proper distance from. other wells Yes 7 Sufficient acreage available in drilling unit Yes _ 8 If deviated, is wellbore plat included Yes 9 Operator only affected party. _ Yes 10 Operator has appropriate bond in force Yes 11 Permit can be issued without conservation order. Yes 12 Permit. can be issued without administrative approval _ Yes Appr Date 13 Can permit be approved before 15-day wait- Yes RPC 6129/2006 ' 14 Well located within area and trata authorized by Injection Order # (put 10# in comments)-(For. NA 15 All wells within 114_ mile area of review identified (For service well only) NA_ 16 Pre-produced injector: duration of pre production less than 3 months. (For service well only) _ NA_ _ _ '17 Nonconven._ gas conforms to AS31.05,030(].1.A),Q.2.A-D) _ No X18 Conductor stung provided NA ___ _ - Engineering 119 Surface casing. protects all kncwn U$DWS N,4 20 CMT vol adequate to circulate. on conductor & surf csg NA 21 CMT vol adequate to tie-in Jong string ko surf csg NA 22 CMT will cover all known productive horizons- No _ _ Slotted. 23 Casing designs adequate for C, T, B & permafrost....... Yes '24 Adequate iankage_or reserve pit Yes Nabors 9ES. 25 If a re-drill, has a 10-403 for abandonment been approved _ _ NA_ _ _ Lateral... 26 Adequate wellbore separation proposed- Yes _ '27 If dverter required, does it meet regulations NA_ _ . Sidetrack. 28 Dulling fluid program schematic ~. equip list adequate .... Yes _ Max MW 9,2 ppg, Appr Date '29 BOPES, do they meet. regulation Yes WGA 6!3012006 '30 BOPE press rating appropriate; test to (put prig in comments) Yes Test to 3500. psi.. M$P 1558 psi. 31 Choke_man'rfold complies w1APl RP-53 (May 84)_ _ Yes '32 Work will occur without operation shutdown. Yes . - - - 33 Is presence of H2S gas probable No_ _ Not an H2S pad. 34 .Mechanical condition of wells within AOR verified (For_se[vice well only) _ _ _ _ NA 35 Permit can be issued w/o hydrogen sulfide measures _ _ No Geology 1136 .Data. presented on_ potential overpressure zones _ _ _ _ _ NA_ _ _ _ 137 Seismic analysis of shallow gas zones- NA_ Appr Date 1,38 .Seabed condition sun!ey (if off-shore) NA_ _ _ RPC 612912006 ',39 .Contact name/phone forweekly_progress reports_[exploratoryouly] _ NA_ . • • Geologic Engineering Public Date: Date Date Commissioner: om issioner: Commis