Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout206-095•
Image Project Well History File Cover Page
XNVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
o~Q ~ - ~ ~~ Well History File Identifier
Organizing (done> ^ Two-sided III IIIII II III II III ^ Rescan Needed III IIIIII II II III III
RE CAN DIGITAL DATA OVERSIZED (Scannable)
Color Items: Diskettes, No. ~ ^ Maps:
^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by
a Large Scanner
^ Poor Quality Originals:
OVERSIZED (Non-Scannable)
^ Other:
^ Logs of various kinds:
NOTES: ^ Other::
BY: Maria Date: /s/
Project Proofing III IIIIII IIIII II III
BY: Maria Date: D /s/
Scanning Preparation ~
x 30 = ~Q~ + ~.1 =TOTAL PAGES
_
~
~
~ (Count does not include cover sheet)
BY: Maria Date: 1 1 L ,~.
/~ Q /s/ 1 Y Ir
Production Scanning
Stage 1 Page Count from Scanned File: ~_ (Count does include cove eet)
Page Count Matches Number in Scanning Preparation: YES NO
BY: Maria Date: 1/ 3 ~ /s/ ~~
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO ~ y ~
BY: Maria Date: /s/
Scanning is complete at this point unless rescanning is required. III II II I) I II II I I III
ReScanned III IIIIII IIIII IIIII
BY: Maria Date: /s/
Comments about this file: Quality Checked
10/6/2005 Well History File Cover Page.doc
•
4
,fie.
;&L; ~~
~ ~, y.~k~ • ~'
.-.-
~.
~r
~~
MICROFILMED
6/30/2010
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
C:\temp\Temporary Internet Files\OLK9\Microfilm Marker.doc
3 0 ~ ~s~ 4
DATA SUBMITTAL COMPLIANCE REPORT
9/12/2008
Permit to Drill 2060950 Well Name/No. PRUDHOE BAY UN ORIN L-204L3 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23314-62-00
MD 11925 TVD 4622 Completion Date 9/3/2006 Completion Status 1-OIL Current Status 1-OIL UIC N
REQUIRED INFORMATION
Mud Log No Samples No Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: MWD / GR / RES / AZI DEN / NEU /AIM / PWD (data taken from Logs Portion of Master Well Data Maint
Well Log Information:
Log/ Electr
Data Digital Dataset Log Log Run Interval OH /
Typ Med/Frmt Number Name Scale Media No Start Stop CH Received Comments
D Asc Directional Survey 0 11925 Open 10/4/2006
~ pt Directional Survey 0 11925 Open 10/4/2006
D C Las 15489 Induction/Resistivity 6093 11924 Open 10/3/2007 DCHO, DRHO, GR, NPHI,
RHOB w/PDS graphics
Field Data
C Lis 15707 Induction/Resistivity 486 11924 Open 11/19/2007 LIS Veri, GR, ROP, FET,
RPS, RPMDRHO, NPHI
w/PDS and TIF graphics
g 15707 Induction/Resistivity 2 Blu 6064 11925 Open 11/19/2007 MD Vision Service 20-Aug-
2006 !
~g 15707 Induction/Resistivity 2 Blu 6064 11925 Open 11/19/2007 TVD Vision Service 20-
Aug-2006;
Well Cores/Samples Information:
Name
ADDITIONAL INFORMATION
Well Cored? Y /®
Chips Received? 1"'tid-~
Analysis ~L.Pd~
Received?
Sample
Interval Set
Start Stop Sent Received Number Comments
Daily History Received? ~y/ N
Formation Tops y~'N
Comments:
DATA SUBMITTAL COMPLIANCE REPORT
9/12/2008
Permit to Drill 2060950 Well Name/No. PRUDHOE BAY UN ORIN L-204L3 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23314-62-00
MD 11925 TVD 4622 Completion Date 9/3/2006 Completion Status 1-OIL Current Status 1-OIL UIC N
~~
Compliance Reviewed By:
Date:
11/09!07
V
Schlumberger
Schlumberger-DCS
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well Job #
Log Description
NO. 4491
Company: Alaska Oil 8 Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Orion
Date BL Color CD
L-204 40013758 OH MWDILWD EDIT '- 08102/O6 2 1
L-204L1
L-204L2 40013758
40073758 OH MWD/LWD EDIT
OH MWDILWD EDIT - 08107/06
08112106 2
2 1
1
L-204L3 40013756 OH MWDILWD EDIT ~ 08120106 2 1
L-204L4 40013758 OH MWDILWD EDIT 08/29106 2 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska)Inc.
Petrotechnical Data Center L-;;"`-'~ '-"" -~" ~ `' ' '~~~
900 E Benson Blvd. t ,, ~, i'
Anchorage AK 99508-4254 ~~ --~ ~~~ ~'-_ .."`. -..
Date Delivered: q~Q~~S -~ yl '~(1; ~-~
u Z' ,tl ,G~m s'
Schlumberger-DCS
2525.Gambell St, Suite 400
Anchorage, AK 99503- 38
ATTN. Beth
Received by:
~ ~
Date 09-20-2007
~' Transmittal Number:92904
~_
BPXA WELL DATA TRANSMITTAL
Enclosed are the materials listed below.
(BPXA FIELD LOG DATA)
have any questions, please contact llouglas llortctl at trie t'll(_; at Jb4-4y /.5
Delivery Contents
1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells:
09-15A afl~'va9 ~ ~Sll~rl
AGI-10A~o~- i3S '~ i5~%~5a _ _
___
- - -_-_ __
F-01A c~G(o-td1 _~ is~/~3 4r5~11f`l
F-01 AP61_- ________ ..___
_ __-_-
F-09Bao~-vr3 ~ ~5y4~5
F-42A 2a~- US3 '' I S~IKt~
L-204L1 a(~(o-v~j3 ~ r5~/~}
L-204L3 a(U(o-OAS 'r t5G1~9
L-204L4 a U(o-p~ f, ~ l 5~! ~ ~
~V-205L1 c~UCo-l?f1 ~IS~/S2
V-205L2 aUfo-~'Ffc7 ~ 15"3
W-204L1_c2f~Co-159 '~ t~~°i_~/
W 204L2 ~U(a-/~ O *` !S x!4.5
WGI-09 USL ~Q~ - !L/(o ~ t5 ~19~
Please Sign and Return one copy of this transmittal.
Thank You,
Douglas Dortch
Petrotechnical Data Center
Attn: State of Alaska - AOGCC
Attn: Christine Mahnken
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 995 19-66 1 2
~ b'
.. i. /}~ .yam
q.V '~J" ~~ STATE OF ALASKA
~~-•~' AI~~ f~l~~~lyD GAS CONSERVATION COMMISSION
WELL COMPLETION pR RECOMPLETION REPORT AND LOG
~18Ska Qil & Gas COnS. Ci7C11ft1iSSlOtt Revised: 12/27!06, Put on Production
1a. Well Status: ®Oil ^ Gas ^ Plugge Abandoned ^ Suspended ^ WAG
20AAC 25.105 zoAAC zs.»o
^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1b. Well Class:
®Development ^ Exploratory
^ Stratigraphic ^ Service
2. Operator Name:
BP Exploration (Alaska} Inc. 5. Date Comp., Susp., or Ab
9/3/2006
~ 12. Permit to Drill Number
206-095 '
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded / ~
8/16/2006 ~ 13. API Number
50-029-23314-62-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
8/18/2006
- 14. Well Name and Number:
PBU L-204L3
2423
FSL, 3544
FEL, SEC. 34, T12N, R11 E, UM
Top of Productive Horizon:
1950' FSL, 131' FWL, SEC. 35, T12N, R11 E, UM (OBa)
8. KB Elevation (tt):
78.6' ~
15. Field /Pool(s):
Prudhoe Bay Field / Orion
Total Depth:
73' FNL, 277' FWL, SEC. 01, T11N, R11E, UM 9. Plug Back Depth (MD+TVD)
11925 + 4622
Ft Schrader Bluff
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 583372 y- 5978147 Zone- ASP4 10. Total Depth (MD+TVD)
11925 + 4622
Ft 16. Property Designation:
ADL 028240
TPI: x- 587053 y_ 5977715 Zone- ASP4
Total Depth: x- 592505 y- 5975757 Zone- ASP4 11. Depth where SSSV set
None MD 17. Land Use Permit:
18. Directional Survey ®Yes ^ No 19. Water depth, if offshore
N/A MSL 20. Thickness of Permafrost
1900' (Approx.)
21. Logs Run:
MWD / GR / RES / AZI DEN / NEU /AIM / PWD
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT
SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED
4-1/2" 12.6# L-80 6004' 11912' 4409' 4621' 6-3/4" Uncemented Slotted Liner
23. Perforations open to Production (MD + TVD of Top and 24. TUBING RECORD
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD
4-1 /2" Slotted Section
MD TVD MD TVD
6538' - 9709' 4485' - 4561'
10128' - 11869' 4588' - 4619' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL MD AMOUNT Ht KIND OF MATERIAL USED
6064' Top of Window (off of Retrieved Whipstock)
26. PRODUCTION TEST
Date First Production:
Reported on L-204 Method of Operation (Flowing, Gas Lift, etc.):
See L-204 10-407 (Dated 12/27/06, PTD #206-092) for Production & Test Data
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD OIL-BBL GAS-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO
Flow Tubing
PfeSS. Casing Pressure CALCULATED
24-HOUR RATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK)
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet,~f r>~ce~~itjr~"
Submit core chips; if none, state "none".
^~ . ~,
None `,,-µ• ~~^~
w x~.4 ,.....
Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE
. .~ 3 '~ ! `` .-.
~~ JUL. 0 3 2007
28. 29.
GEOLOGIC MARKER ORMATION TESTS
Include and briefly summarize test results. List intervals tested,
Na,Me MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Schrader Bluff OBa 6071' 4444' None
Schrader Bluff OBb 6178' 4491'
Schrader Bluff OBb 6419' 4499'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
l ~
/
Signed Terrie Hubble
Title Technical Assistant Date
2-? d
PBU L-204L3 206-095 Prepared By Name/Number. Terrie Hubble, 564-4628
Well Number Drilling Engineer: Scott Ko/stad, 564-5347
Permit No. / A royal No.
INSTRUCTIONS
GeNew-~: This form iS designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITeM 4b: TPI (Top of Producing Interval).
ITeM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in
other spaces on this form and in any attachments.
ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITeM 20: True vertical thickness.
ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITeM 28: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
IreM 27: If no cores taken, indicate "None".
IreM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
STATE OF ALASKA ~ RE~EIV~C
ALAS IL AND GAS CONSERVATION COM aSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~"' ~~~ ~~ ~ 4 2006
~;t~r~, ~: ~; r~s t,~jns. Commissid
1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG
zoAAC zs.~os zoAAC zs.»o
^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1 b. Well Class: An hp~
®Developmenif U~xploratory
^ Stratigraphic ^ Service
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.
9/3/2006 12. Permit to Drill Number
206-095
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
8/16/2006 13. API Number
50-029-23314-62-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
8/18/2006 14. Well Name and Number:
PBU L-204L3
FEL, SEC. 34, T12N, R11 E, UM
2423
FSL, 3544
Top of Productive Horizon:
1950' FSL, 131' FWL, SEC. 35, T12N, R11 E, UM (OBa)
8. KB Elevation (ft):
78.6'
15. Field /Pool(s):
Prudhoe Bay Field / Orion
Total Depth:
73' FNL, 277' FWL, SEC. 01, T11N, R11E, UM 9. Plug Back Depth (MD+TVD)
11925 + 4622 Ft Schrader Bluff
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 583372 y- 5978147 Zone- ASP4 10. Total Depth (MD+TVD)
11925 + 4622
Ft 16. Property Designation:
ADL 028240
TPI: x- 587053 y- 5977715 Zone- ASP4
Total De
th: x- 592505 y- 5975757 Zone- ASP4 11. Depth where SSSV set
None MD 17. Land Use Permit:
p
18. Directional Survey ®Yes ^ No 19. Water depth, if offshore
N/A MSL 20. Thickness of Permafrost
1900' (Approx.)
21. Lags Run:
MWD / GR / RES / AZI DEN / NEU /AIM / PWD
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTW TVD HOLE AMOUNT
SIZE WT. PER FT. GRADE TOP " BOTTOM` TOP BOTTOM SIZE CEMENTING REGORD PULLED
4-1/2" 12.6# L-80 6004' 11912' 4409' 4621' 6-3/4" Uncemented SI tted Liner
23. Perforations open to Production (MD + TVD of Top and 24 TUBING RECORD
Bottom Interval, Size and Number; if none, state "none") : SIZE DEPTH SET MD PACKER SET MD
4-1/2" Slotted Section
MD TVD MD TVD
6538' - 9709' 4485' - 4561'
10128' - 11869' 4588' - 4619' 25 ACID, FRACTURE, CEMENT SDUEEZE, ETC.
DEPTH INTERVAL MD AMOUNT He KIND OF MATERIAL USED
6064' Top of Window (off of Retrieved Whipstock)
26. PRODUCTION TEST
Date First Production:
Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD OIL-BBL GAS-MCF WATER-B8L CHOKE SIZE GAS-OIL RATIO
Flow Tubing
PreSS. Casing Pressure CALCULATED
24-HOUR RATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK)
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Sulppa~tcore chips; if none, state "none".
~ ~ ~ o~' ~u~~.~ 6a ~6 .» ~~ r-~' ~.~ ~v~
None ~ ~~
1L~~
V ID?
Form 10 ~ iSCCt"'I2/2003 r,, ~ ( CONTINUED ON REVERSE SIDE ~~ ~~~ 0 ~~ ~ ~ ~oOe
28 GEOLOGIC MARKS 29. RMATION TESTS
Include and brie ummarize test results. List intervals tested,
Nanne MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Schrader Bluff OBa 6071' 4444' None
Schrader Bluff OBb 6178' 4491'
Schrader Bluff OBb 6419' 4499'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge. l
lO
l ~l~
Signed Terrie Hubble ~ Title Technical Assistant Date
PBU L-204L3 206-095 Prepared ey NameAVumber.~ Terrie Hubble, 564-4628
Well Number Permit No. / A rOVal NO. Drilling Engineer: Scott Kolstad, 564-5347
INSTRUCTIONS
GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
IreM ia: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in
other spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: True vertical thickness.
IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
IreM 27: If no cores taken, indicate "None".
IreM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
`BP Page 1 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABORS 9ES Rig Number:
Date From - To Hours. Task .Code NPT Phase Description of Operations
7/15/2006 14:00 - 15:00 1.00 RIGD P PRE Rig released from L-217i. Ready rig floor, unpin topdrive, bridle
up traveling blocks.
15:00 - 16:00 1.00 MOB P PRE Move mud pits around pad. Made "critical lift" for removal of
diverter lines from L-217i out of critical path.
16:00 - 17:00 1.00 RIGD P PRE PJSM. Lower pipe chute, lay down derrick.
17:00 - 18:30 1.50 MOB P PRE PJSM. Jack rig up and move off of L-217i. Move rig around
pad.
18:30 - 21:30 3.00 DIVRTR P PRE Nipple up Diverter stack and lines due to lack of space behind
rig. See "Daily Operational Comments".
21:30 - 23:00 1.50 MOB P PRE PJSM. Position rig in front of conductor.
23:00 -00:00 1.00 MOB P PRE Lay matting boards and herculite for rig.
7/16/2006 00:00 - 01:00 1.00 RIGU P PRE PJSM. Spot rig over conductor. Set matting boards in place.
Level rig and set rig down in place.
01:00 - 02:00 1.00 RIGU P PRE Laydown herculite under mud pit complex. Spot mud pits in
place and set matting boards. Set down mud pits down.
02:00 - 03:00 1.00 RIGU P PRE PJSM. Raise and pin derrick.
03:00 - 03:30 0.50 RIGD P PRE Take on Spud Mud in mud pits. Raise and pin pipe chute.
03:30 - 04:00 0.50 RIGU P PRE
04:00 - 05:00 1.00 RIGU P PRE
05:00 - 07:30 2.50 DIVRTR P PRE
07:30 - 08:30 1.00 RIGD P PRE
08:30 - 09:00 0.50 RIGU P PRE
09:00 - 11:00 2.00 RIGD P PRE
11:00 - 12:00 1.00 RIGU P PRE
12:00 - 12:30 0.50 RIGD P PRE
12:30 - 13:00 I 0.501 RIGU I P PRE
13:00 - 13:30 0.50 DIVRTR P PRE
13:30 - 14:30 1.00 RIGU P PRE
14:30 - 18:00 3.50 RIGU P PRE
18:00 - 21:00 3.00 RIGD P PRE
21:00 -22:00 1.00 RIGD P RE
22:00 -22:30 0.50 RIGU P PRE
22:30 -00:00 1.50 DRILL P SURF
'Accept rig ~ 00:00 hr 7/16/2006. (Backed up 3 hrs due to
previous Diverter installation).
Make up kelly hose to topdrive.
Bridle down, pin traveling blocks to topdrive.
Change out riser from 16" to 20". Nipple up 20" riser. Install
dresser sleeve and tum-buckles.
Rig up rig floor, remove spreader beam over iron roughneck.
Inspect topdrive quill - OK. Put all floor equipment in it's proper
place.
Service topdrive and crown section.
Continue load and strap 4" drillpipe and HWDP in pipe shed.
Cut and slip drilling line 76'.
Attempt to pick up drillpipe to rack back in derr~k. Hit ice plug
~ 40 feet.
Pick up and make up 13.5" bit, NBSTB, and crossover to
driilpipe to drill ice plug.
Function test diverter system. Perform accumulator test.
Witnessing of test waived by AOGCC rep Chuck Shieve.
W ftnessed by NAD TP Kelly Cozby.
''Note: Crew held Pre-Spud meeting during their Pre-Tour
meeting.
Fill conductor and check for leaks - OK. Cleanout ice from 40'
'to 105'. Laydown bit and NBSTB
Pick up drillpipe, HWDP, jar stand, and rack back in derrick.
Pick up and make up 13.5" directional BHA #1. Bit - RR1
MX-C1, 1.83 deg PDM. Orient motor with MWD.
'Rig up Gyro Data and Sperry W L.
Pressure test mud lines, stand pipe and mud man'rfold to 3,500
psi - OK.
Spud in L-204 ~ 22:30 hr 7/162006. Drill 13.5" surtace hole
from 109' to 263'. 500 gpm, 520 psi, 40 rpm, 780 ff/Ibs torque.
PU, SO, RT - 55k. ART - .34 hr. Lost 200 bbls. spud mud
immediatly after drilling out of conductor cement, to app. 325 ft.
treated with Poly Pac Supreme to heal losses.
PfIM6tl: 9/5/2006 2:49:57 PM
BP Page 2 of 31
.Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To` Hours Task Code NPT Phase Description of Operations
7/17/2006 00:00 - 01:30 1.50 DRILL P SURF Continue drilling 13.5" surface hole from 263' to 447'. Started
kick-off ~ 300'. Gyro survey every stand. 550 gpm, 780 psi
on, 730 psi off. 40 rpm, 3k TO on, 1.5k TO off. PU - 65k, SO -
64k, RT - 65k, W OB - 30k.
01:30 - 02:00 0.50 DRILL P SURF POH from 447' to 170'. Pick up jar stand.
02:00 - 02:30 0.50 DRILL P SURF Run in hole from 170' to 447' without problem.
02:30 - 12:00 9.50 DRILL P SURF Continue drilling directionally from 447' to 1,097'. Continue
gyro surveys every stand to last survey ~ 1,097' (bit depth).
700 gpm, 2,130 psi on, 2,010 psi off, 60 rpm, 4.5k TO on, 2k
TO off. PU - 72k, SO - 65k, RT - 70k, WOB - 30k. Backream
30' prior to connections. ART - 1.73 hrs, AST - 4.6 hrs.
12:00 - 12:30 0.50 DRILL P SURF Rig down Sperry WL and Gyro Data tools.
12:30 - 16:30 4.00 DRILL P SURF Continue drilling directionally from 1,097' to 1,670'. 700 gpm,
2,400 psi on, 2,200 psi off, 60 rpm, 3.7k TO on, 1.7k TO off.
PU - SOk, SO - 70k, RT - 75k, WOB - 35k. Backream 30' prior
to connections. ART - 1.75 hrs, AST - 3.18 hrs.
16:30 - 18:00 1.50 DRILL P SURF Circulate bottoms up 3 times ~ 700 gpm, 2,465 psi, 60 rpm,
2.1 k TO. Hole unloaded good amount of clay balls during
circulation. Circulated until shakers cleaned up. 9.1 ppg MW,
300 Vis.
18:00 - 19:00 1.00 DRILL P SURF Monitor well - OK. POH from 1,670' to 269'. Had 1 stand
swabbing from 1,060' to 1,040'. Wiped full stand through
several times and quit swabbing. No other problems.
19:00 - 21:00 2.00 DRILL P SURF Laydown UBHO sub, bit, and adjust motor from 1.83 deg to 1.5
deg. Make up new bit #2 MX-C1 and stabilizer.
21:00 - 22:30 1.50 DRILL P SURF Run in hole with BHA #2 to bottom ~ 1,670' without problem.
22:30 - 23:00 0.50 DRILL P SURF Circulate bottoms up ~ 500 gpm, 2,150 psi, 60 rpm, 2k TO.
Returned large amount of clay on bottoms up.
23:00 -00:00 1.00 DRILL P SURF Continue drilling directionally from 1,670' to 1,770'. 700 gpm,
2,585 psi on, 2,250 psi off, 60 rpm, 4.7k TQ on, 2.8k TQ off.
PU - 80k, SO - 70k, RT - 75k, W OB - 35k. Backream 30' prior
to connections. ART - .38 hrs. "No mud losses for the day.
Start cutting viscosity back towards target of 200-250 ~
flowline.
7/18/2006 00:00 - 08:30 8.50 DRILL P SURF Continue drilling directionally from 1,770' to TD ~ 3,470' MD,
2,786' TVD. 680 gpm, 3,420 psi on, 3,350 psi off, 80 rpm, 5.6k
TO on, 3.4k TO off. PU - 114k, SO - 79k, RT - 93k, WOB -
30k. Backream 30' prior to connections. Reduced pump rate
to 680 gpm's due to pump liner limitations. Cut viscosity back
to 200-250 ~ flowline. "Encountered 1st hydrates ~ 2,070'
and continued to TD. Hydrates were very light and didn't cause
any problems. TD 13.5" Surface Hole ~ 08:30 hr 7/18/2006.
08:30 - 10:30 2.00 DRILL P SURF Circulated 3 times bottoms up ~ 700 gpm, 3,370 psi, 100 rpm,
3.9k TQ. 9.7 ppg MW.
10:30 - 12:00 1.50 DRILL P SURF Monitor well - OK. Short trip from 3,470' to 1,670'. PU - 125k,
SO - 75k. Intermittent overpull 15-20k through base of
permafrost and transition zone. Wiped clean through overpull
areas. Observed small amount hydrates breaking out during
trip with rw effect on trip. No pumping or rotating when wiping
hole.
12:00 - 13:30 1.50 DRILL P SURF Run in hole from 1,670' to 3,470' without problems. Re-wiped
base of permafrost and transition zones without pumping or
rotating.
PAnted: 9/52008 2:49:57 PM
- BP ~ Page 3 of 31
-OperationsSummary;; Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
7/18/2006 13:30 - 15:30 2.00 DRILL P SURF Circulate and condition mud 3 times bottoms up ~ 700 gpm,
3,365 psi ICP, 3,030 FCP. 100 rpms, 4.9k TO, PU - 120k, SO
- 80k, RT 118k. Returned large amounts of clay back early
prior to bottoms up. Shakers cleaned up after 2nd bottoms up.
9.6 PP9 MW.
15:30 - 18:00 2.50 DRILL P SURF Monitor well - OK. POH to run casing from 3,470' to 269'.
Wipe through base of permafrost and transition zone without
pumping or rotating.
18:00 - 20:00 2.00 DRILL P SURF Laydown BHA #2. Layed down all STABs, NM lead DC, MWD,
motor and bit.
20:00 - 21:00 1.00 DRILL P SURF Clear rig floor of drilling tools. Clean mud off of rig floor.
21:00 - 23:30 2.50 CASE P SURF Rig to run 103/4" casing. Make dummy run with fluted casing
hanger and landing joint.
23:30 - 00:00 0.50 CASE P SURF PJSM. Pick up and make up 103/4" 45.5# K-55 BTC casing
shoe track. Baker-Lok 1st 3. joints with make up to mark ~
7,500 fUlbs torque. Check floats - OK.
'No mud losses for the day.
7/19/2006 00:00 - 04:00 4.00 CASE P SURF Continue running in hole with 10 3/4" 45.5# K-55 BTC surface
casing from 120' to 1,850' without problem. PU - 140k, SO -
80k. Ran in hole filling every joint with casing fill-up tool ~ 80
fpm with full displacement. Started pushing mud away
between 1,850 to 2,030' where the casing started taking
weight. Lost appx 6 bbls. Make up casing using Best-O-life
2000 pipe lubricant. Used 25 bowspring centralizers on the
1st 25 joints.
04:00 - 05:00 1.00 CASE P SURF Circulate bottoms up while working pipe between 2,030' and
2,090' Staged pumps up to 6.5 bpm, 400 psi. Lost appx 20
bbls while establishing circulation with hole partially packing off.
Had full retums without losses after rate was up to and over 3
bpm. Returned good amount of clay early back to shakers.
Shakers cleaned up after initial day came up.
05:00 - 07:30 2.50 CASE P SURF Run in hole from 2,090' to 2,160 without pumping. Set down ~
2,160' and started washing from 2,160' to 2,360' ~ 5 bpm, 390
psi. No mud losses.
07:30 - 09:00 1.50 CASE P SURF Run in hole from 2,360' to 2,625 without pumping. Set down ~
2,625'. No mud losses
09:00 - 11:30 2.50 CASE P SURF Stage pumps up to 5 bpm with good retums. Precautionary
wash from 2,625' to 3,450' ~ 5 bpm, 420 psi. No mud losses.
11:30 - 12:00 0.50 CEMT P SURF Land casing on depth with shoe ~ 3,457'. Laydown casing
till-up tool, make up cement head. PU - 175k, SO - 100k.
Ran total of 82 joints of 10.75" 45.5# K-55 BTC casing.
Float collar ~ 3,371'
12:00 - 15:30 3.50 CEMT P SURF Circulate and condition mud to a 55 vis and YP of 14. 8.2 bpm,
400 psi, PU - 225k, SO - 100k. Reciprocated pipe throughout
circulation in 3 ft. strokes due to hanger hanging up in the
diverter stack. No mud losses. Held cementing PJSM while
circulating.
15:30 - 19:00 3.50 CEMT P SURF Switch over to Dowell. Pump 5 bbls of water. Pressure test
lines to 3,500 psi - OK. Pump 80 bbls of 10.1 ppg MudPush II
spacer ®5.5 bpm, 25 psi ICP, 115 psi FCP. Shut down and
drop bottom plug. Mix and pump 477 bbls, 597 sx of 10.7 ppg
of Arctic Set Lite lead cement slurry ~ 6 bpm, 140 psi ICP,
280 psi FCP. Mix and pump 97 bbls, 468 sx of 15.8 ppg Class
Printed: 9/5/2006 2:49:57 PM
BP Page 4 of 31
Operations Summary Report -
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7!15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To `Hours Task Code NPT Phase Description of Operations
7/19/2006 15:30 - 19:00 3.50 CEMT P SURF "G" tail cement slurry ~ 5.8 bpm, 360 psi ICP, 280 psi FCP.
Shut down and drop top plug. Kick out plug with 5 bbls of
water.
Switch over to rig. Displace cement with 320 bbls of 9.5 ppg
mud. 1st 310 bbls ~ 8 bpm 266 psi ICP, 765 psi FCP.
Remaining 10 bbls pumped ~ 4 bpm, 600 psi ICP, 680 FCP.
Bumped plug with 2,000 psi ®98% pump efc. CIP ~ 18:45
hr. Bleed off pressure and check floats - OK. Observed
contaminated cement to surface with 122 bbls of displacement
away. Returned prime cement with 201 bbls of displacement
away. Stopped reciprocating and set casing on landing ring
with 216 bbls of displacement away. 129 total bbls of sidewalk
cement back to surface. Had full returns throughout
cementing and displacement.
19:00 - 20:00 1.00 CEMT P SURF Flush diverter stack and lines. Rig down cement head, lay
down landing joint.
20:00 - 22:00 2.00 CASE P SURF Rig down casing tools, change out bales, and clear floor.
22:00 - 00:00 2.00 DIVRTR P SURF Nipple down diverter system.
7/20/2006 00:00 - 01:30 1.50 DIVRTR P SURF Continue cleaning and nipple down of diverter system. Pick up
diverter stack and secure in cellar. Change out riser nipple
from 20" to 16".
01:30 - 04:00 2.50 WHSUR P SURF Make up casing head and test metal to metal seals to 1,000 psi
- OK. Nipple up tubing spool.
04:00 - 06:00 2.00 BOPSU P SURF Nipple up ROPE.
06:00 - 07:00 1.00 BOPSU P SURF Jack up rig and place cribbage under sub to level rig.
07:00 - 08:00 1.00 BOPSU P SURF Continue nipple up of BOPE.
08:00 - 08:30 0.50 BOPSU P SURF Pick up jet sub and flush stack prior to BOPE test.
08:30 - 09:30 1.00 BOPSU P SURF Rig up to test BOPE.
09:30 - 13:00 3.50 BOPSU P SURF Test all BOPE's to 250 psi low, 3,500 psi high for 5 minutes
each. Perform accumulator test. Test witnessed by AOGCC
rep John Crisp, BP WSL Alan Madsen, NAD TP Kelly Cozby.
13:00 - 13:30 0.50 BOPSU P SURF Rig down BOP test equipment.
13:30 - 14:00 0.50 WHSUR P SURF Install wear bushing.
14:00 - 17:00 3.00 DRILL P INT1 Pick up drill pipe out of pipe shed to 1,600' then POH racking
back in derrick.
17:00 - 19:00 2.00 DRILL P INTi PJSM. Pick up and make up BHA # 3. 9 7/8" Re-built
DSX147, 1.5 deg PDM, ARC, ADN. Load nuclear sources and
orient MW D to motor.
19:00 - 19:30 0.50 DRILL P INT1 Run in hole with BHA # 3 on HWDP to 996'. Shallow hole test
MWD - OK, 617 gpm, 1,220 psi.
19:30 - 21:00 1.50 DRILL P INT1 Run in hole picking up drill pipe out of pipe shed from 996' to
3,204'. Placed ghost reamer 1,675' above bit.
21:00 -22:00 1.00 DRILL P INT1 Circ air out of drill pipe. Pressure test 103/4" 45.5# K-55 BTC
casing to 2,500 psi / 30 minutes - 0 psi loss.
22:00 -00:00 2.00 DRILL P INT1 Wash down and tag top of cement ~ 3,365'. Drill out cement,
float collar on depth ®3,370'. Continue drilling out shoe track
to 3,430'. 600 gpm, 2,695 psi, 60 rpm, 7.6k TO, PU - 120k, SO
- 75k, RT - 93k.
7/21/2006 00:00 -00:15 0.25 DRILL P INT1 Continue drilling cement, shoe, and rathole from 3,430' to
3,470. 600 gpm, 2,395 psi, 60 rpm, 5.7k TD. Started
displacing hole 5' prior to drilling out shoe.
00:15 -00:30 0.25 DRILL P INT1 Drill new 9 7/8" hole from 3,470' to 3,490' with same
parameters.
Printed: 9/5/2006 2:49:57 PM
. ~ _; _
B P Page 5 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABORS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
7/21/2006 00:30 - 01:30 1.00 DRILL P INT1 Continue displacing well from 9.5 ppg spud mud to 8.8 ppg
LSND mud ~ 250 gpm, 460 psi. Only able to get 1 empty Vac
truck for job and offload from mud pits ~ 6 bpm.
01:30 - 02:00 0.50 DRILL P INT1 Perform LOT. MD - 3,457', TVD - 2,778', MW 8.8 ppg, Leak off
pressure - 610 psi, EMW - 13.02 ppg
02:00 - 02:30 0.50 DRILL P INT1 Perform benchmark ECD's and slow pump rates. CECD - 9.24
PP9•
02:30 - 12:00 9.50 DRILL P INT1 Directionally drill from 3,490' to 5,690'. 700 gpm, 2,660 psi on,
2,450 psi off, 80 rpm, 7.4k TO on, 7k TD off, PU - 140k, SO -
85k, RT - 107k, WOB - 25k. AST - .56 hrs, ART - 4.67 hrs.
CECD - 9.69 ppg, AECD - 9.92 ppg. Pumped 30 bbls high vis
sweep ~ 4,100' with no increase in cuttings with bottoms up.
Pumped 35 bbls high vis, 1.5 ppg over, weighted sweep ~
5,670' with same results.
12:00 - 21:00 9.00 DRILL P INT1 Directionally drill from 5,690'. to TD ~ 6,680' MD, 4,632' TVD.
700 gpm, 3,260 psi on, 3,160 psi off, 80 rpm, 9.2k TO on, 7.2k
TO off, PU - 146k, SO - 88k, RT - 115k, WOB - 20k. AST -
4.15 hrs, ART - 1.55 hrs. CECD - 9.79 ppg, AECD 9.90 ppg.
Pumped 38 bbls high vis, 1.5 ppg over, weighted sweep ~
6,646'
'Preliminary Formation Tops
OA G~ 5,935' MD, 4,371' TVD
OBa ~ 6,070' MD, 4,444' ND
OBb ~ 6,165' MD, 4,489' TVD
OBc ~ 6,318' MD, 4,551' TVD
OBd ~ 6,506' MD, 4,605' TVD
21:00 - 21:30 0.50 DRILL P INT1 Finish pumping sweep out of hole. No increase in cuttings with
bottoms up. Take final survey.
21:30 -00:00 2.50 DRILL P INT1 MadPass keg from 6,680' to 6,069' (bit depth) ~ 600 fph. 700
gpm, 2,990 psi, 80 rpm, 6.8k TO. No problems.
No mud losses.
7/22/2006 00:00 - 01:00 1.00 DRILL P INT1 Continue MadPass log from 6,069' to 5,650' (bit depth) ~ 600
fph. 700 gpm, 2,900 psi, 80 rpm, 5k TO. No problems.
01:00 -04:00 3.00 DRILL P INT1 Backream to shoe from 5,650' to 3,457' ~ 1,800 fph. 700
gpm, 2,300 psi, 80 rpm, 4.6k TO. No problems.
04:00 - 04:30 0.50 DRILL P INT1 Circulate bottoms up while rotating out 3 stands to 3,127'. 700
gpm 2,200 psi, 80 rpm, 4.5k TQ. 30% increase in cuttings
(clay balls) on bottoms up. Circulate shakers clean.
04:30 - 05:00 0.50 DRILL P INT1 Service topdrive, drawworks, and crown.
05:00 - 07:30 2.50 DRILL P INT1 POH for MDT logs from 3,127' to 164'.
07:30 - 09:30 2.00 DRILL P INT1 PJSM. Laydown nuclear source. Laydown remainder of BHA
#3.
09:30 - 10:00 0.50 DRILL P INT1 Clear and dean rig floor.
10:00 - 12:00 2.00 EVAL P INTi Rig up Schlumberger Wireline for MDT logs.
12:00 -13:00 1.00 EVAL P NT1 Surface test logging tools. Tests failed. Expedite tool from
Deadhorse.
13:00 - 16:30 3.50 EVAL N SFAL INT7 Rig down tools to trouble shoot packer assembly. Change out
packer and test same - OK. Make up tools and surface test
logging assembly -Test failed.
16:30 - 19:30 3.00 EVAL N SFAL INT1 Continue trouble shoot logging tools. Narrowed failure down to
2 different tools. Unable to repair on location.
19:30 - 21:00 1.50 EVAL N SFAL INT1 Rig down SLB to send tools to SLB shop. Clear floor.
Printed: 9/5/2006 2:49:57 PM
BP Page 6 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
7/22/2006 21:00 - 22:00 1.00 EVAL N SFAL INT1 Prepare to pick up dumb iron cleanout assembly. Bring bit and
NBSTAB to floor. load pipe shed with 5" HWDP.
22:00 - 00:00 2.00 EVAL N SFAL INT1 Make up cleanout assembly (BHA #4). 9 7/8" RR bit (from
BHA #3), NBSTAB, 4 joints 5" HWDP, Jar, 4 joints 5" HWDP,
XO, 24 joints 4" HWDP.
7/23/2006 00:00 - 01:00 1.00 EVAL N SFAL INT1 Run in hole to 3,409' with cleanout assembly due to SLB MDT
tool failure.
'Received call from SLB WL supervisor Bob Templeton ~
12:15 hr to rwtify us that no progress had been made on
trouble shooting the logging tools. They have Houston SLB
techs helping trouble shoot.
01:00 - 03:30 2.50 EVAL N SFAL INT1 Fill pipe and circulate a bottoms up ~ 336 gpm, 580 psi, 40
rpm, 2.2k TO. Circulate another bottoms up ~ 710 gpm, 2,050
psi, 120 rpm, 2.1 k TO. Did not return any increase in cuttings
on bottoms up. Slow pump rate to 113 gpm, 100 psi while
waiting on SLB.
'02:25 hr, called SLB on progress -making progress.
'02:45 hr, SLB called on progress -not sure, but maybe -doing
some final tests.
'03:20 hr, SLB called on progress -tool good to go. Found
broken component in the pump out tool.
03:30 - 04:15 0.75 EVAL N SFAL INT1 Run in hole from 3,409' to ~ 5,400' without problems. Set
down ~ 5,400'.
04:15 - 04:45 0.50 EVAL N SFAL INT1 Attempt to work down without pump with no success. Make up
topdrive, fill pipe and establish circulation with 200 gpm, 400
psi. Fell through immediately while pumping and no rotation.
Wipe through several times with and without pump and no
indication of drag. Continue running in hole from 5,400 to
5,945' with no pumps of rotation. Washed by from 5,945' to
5,990'. RIH from 5990 to 6,118' with no pumps or rotation. Set
down ~ 6,118'.
04:45 - 05:00 0.25 EVAL N DPRB INT1 Attempt to work down with pump without success ~ 200 gpm,
425 psi. Rotate and fall through tight spot ~ 6,118' and wash
stand down to 6,182', 30 rpm, 1.8k TO, PU - 135k, SO - 80k,
RT - 100k. Backream up to tight spot ~ 6,118' and stuck pipe.
Not able to go down or up. Fult circulation. SLB tools back
on location ~ 05:00 hrs.
05:00 - 12:30 7.50 EVAL N STUC INTi Work stuck pipe ~ 6,118'. Attempt to torque and slump drill
pipe down with different pump rates from 200 gpm to 400 gpm
without success. Had full circulation without any packoff
indications. Jar down on pipe with and without pumps with
good jar action. Pump rates varied from no pump up to 600
gpm, 2,100 psi. Tried various torques and stump. Pipe came
free from jarring down without torque.
12:30 - 13:00 0.50 EVAL N DPRB INT1 Wash stand down to 6,183' then backream from 6,183' to
6,087' ~ 600 gpm, 2,060 psi, 100 rpm, 4k TO. Tight area
cleaned out.
13:00 - 14:00 1.00 EVAL N SFAL INT7 Continue running hole from 6,087' to 6,565' with and without
pumps, washing through minor tight spots as needed.
Precautionary wash to bottom from 6,565' to 6,680'.
14:00 - 14:30 0.50 EVAL N SFAL INT1 Circulate bottoms up ®600 gpm, 2,130 psi, 120 rpm, 4k TQ.
Printed: 9/5/2006 2:48:57 PM
BP Page 7 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABORS 9ES Rig Number:
Date- From - To Hours Task Code NPT Phase Description of Operations
7/23/2006 14:00 - 14:30 0.50 EVAL N SFAL INT1 Very little cuttings back during circulation.
14:30 - 15:30 1.00 EVAL N SFAL INT1 Circulate and pump a high vis, weighted sweep ~ 1.5 ppg
over. 650 gpm, 2,450 psi. No increase in cuttings with sweep
back to surface. MW - 9.1+ppg.
15:30 - 18:00 2.50 EVAL N SFAL INTi Monitor well - OK. POH from 6,680' to 3,409'. Worked and
re-wiped through minor tight spots ~ 5,968', 5,660', and 5,400'.
18:00 - 19:30 1.50 EVAL N SFAL INT7 Monitor well ~ shoe - OK. Continue POH from 3,409' to
1,021'.
19:30 - 20:30 1.00 EVAL N SFAL INT1 Stand back 4" and 5" HWDP. Break bit, leave NBSTAB on
HWDP for next cleanout run.
20:30 - 21:00 0.50 EVAL N SFAL INT1 Clear and clean rig floor.
21:00 -00:00 3.00 EVAL N SFAL INT1 PJSM with SLB W L. Rig up and start surface testing MDT
logging tools.
7/24/2006 00:00 - 01:00 1.00 EVAL N SFAL INTi Continue making up and test MDT logging tools.
01:00 - 01:30 0.50 EVAL P INT1 Rig up wireline sheave in derrick.
01:30 -06:30 5.00 EVAL P INT1 Run in hole with MDT logging tools on drill pipe to 5,131' tool
depth. Circulated stands down per SLB ~ 1,752', 3,376',
3,748', 4,116', 4,591', 4,974'. 167 gpm, 75-200 psi.
06:30 - 08:30 2.00 EVAL P INT1 Pick up and make up side door entry sub. Rig up lower
sheave, pump down and latch up to logging tools. 210 gpm,
400 psi.
08:30 - 11:00 2.50 EVAL N SFAL INT1 Check tools. MDT pressure sampler would not function. Made
software adjustment to get around problem.
11:00 - 22:30 11.50 EVAL P INT1 Run in hole taking MDT pressure samples from 5,342' to
6,586'. Total of 29 out of 34 tests good pressure samples
taken.
22:30 - 00:00 1.50 EVAL P INT1 POH from 6,586 to 5,956' ~ 1,200 fph for fluid sample tests
7/25/2006 00:00 - 22:00 22.00 EVAL P INT1 Take MDT fluid samples with 5 out of 8 recovered
#1 - 5,956' - OA -good
#2 - 6,324' - OBc -good
#3 - 6,089' - OBa -failed
#4 - 6,196' - OBb -good
#5 - 6,124' - OBa -good
#6 - 6,586' - OBd -good
#7 - 5,453' - M62 -failed
#8 - 5,473' - MB2 -failed
22:00 - 00:00 2.00 EVAL P INT1 PJSM. Pull wire to 200' below the surface and RD the side
door entry sub.
7/26/2006 00:00 - 05:00 5.00 EVAL P INT1 POH from 5,172' standing back 4" DP and HWDP to surface,
MW in - 9.1 ppg, MW out - 9.1 ppg. Breakout and LD MDT
tools.
05:00 - 06:00 1.00 EVAL P INT1 MU cleanout BHA #2: 9-7/8" DS 147, stab, 4 jts of 5" HWDP,
jars, 4 jts of 5" HWDP, 8 stds of 4" HWDP.
06:00 - 07:30 1.50 EVAL P INTi RIH with Clearwut BHA#2 on 4" DP from 1,022' to 3,409'.
07:30 - 09:00 1.50 EVAL P INT1 Cut and slip 71' of drilling line. Service the top drive and crown.
Clean under the drawworks.
09:00 - 11:00 2.00 EVAL P INT1 RIH from 3,409' to 6,680'. Worked tight spots at 6,196' and
6,340' without pumps.
11:00 - 12:30 1.50 EVAL P INT1 Stage up fhe pumps to 560 gpm, 2,050 psi, 130 rpm and
circulate a bottoms up. Pump a 35 bbl 10.6 ppg sweep from
surface to surface at 660 gpm, 2,680 psi, 130 rpm. MW in -
9.1 ppg, MW out - 9.1 ppg.
12:30 - 15:30 3.00 EVAL P INT1 Monitor the well -stable. POH from 6,680' standing back the
Printed: 9/52006 2:49:57 PM
gp Page 8 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABORS 9ES Rig Number:
Date From = To Hours Task Code NPT Phase. Description of Operations
7/26/2006 12:30 - 15:30 3.00 EVAL P INT1 4" DP and 4" HWDP - PU - 133k, SO - 93k.
15:30 - 18:30 3.00 EVAL P INT1 LD Cleanout BHA#2 from the top of the 5" HWDP. Clear and
clean the rig floor.
18:30 - 19:00 0.50 BOPSU P INT1 Pull the wear ring. Jet and drain the BOP stack.
19:00 - 21:00 2.00 BOPSU P INT1 Changeout the upper pipe rams from 3-112" x 6" variables to
7-5l8" rams. Test the door seals to 250 psi / 3,500 psi -good.
RD testing equipment and make a dummy run with the 7-5/8"
casing hanger.
21:00 -00:00 3.00 CASE P INT7 RU to run 7-5/8" 29.7# L-80 BTC-m /TCII casing.
7/27!2006 00:00 - 04:30 4.50 CASE P INT1 PU and RIH with 7-5/8" 29.7# L-80 BTC-m shoe track and
check floats -holding. Continue PU and RIH with 7-5/8" 29.7#
L-80 BTC-m casing to 1,958', utilizing BOL 2000 NM thread
lubricant and torqued to the mark with 10.5k ftlbs. Filled every
joint with the fillup tool and broke circulation for 5 minutes every
10 joints while running in the hole.
04:30 - 05:00 0.50 CASE P INT1 RU the rig floor to run 7-5/8" TCII casing.
05:00 - 08:30 3.50 CASE P INT1 Crossover and RIH with 7-5/8" 29.7# L-80 TCII to 3,441' -
torque fuming each connection with 10k ftlbs and utilizing Jet
Lube Seal Guard thread lubricant. Filled every joint with the
fillup tool and broke circulation for 5 minutes every 10 joints
while running in the hole.
08:30 - 09:00 0.50 CASE P INT1 Circulate a bottoms up at 3,441' prior to going into the open
hole with the casing -300 gpm, 420 psi, PU - 135k, SO - 100k.
09:00 - 15:30 6.50 CASE P INT1 Continue PU and RIH with 7-5/8" 29.7# L-80 TCII to 6,642' -
torque turning each connection with 10k ftlbs and utilizing Jet
Lube Seal Guard thread lubricant. Filled every joint with the
fillup tool and broke circulation every 5 joints RIH and
circulated for 10 minutes every 15 joints while running in the
hole. Washed the last joint down to 6,642'.
15:30 - 16:00 0.50 CASE P INT1 MU the casing hanger and landing joint. Land the hanger on
the ring with the shoe at 6,670'. LD the fillup tool and RU the
cement head, PU - 225k, SO - 107k.
Ran total of:
46 jts (includes 4 RA marker joints) 7 5/8" 29.7# L-80 BTC-M
casing,
119 jts 75/8" 29.7# L-80 TCII casing
1 X-over jt 75/8" TCII box XBTC-M pin
2 ea. 10 'BTC-M pup joints
3 ea. 20 'BTC-M pup joints
81 straight 7-3/4" x 9-5/8" x 8" centralizers
40 stop rings
Shoe ~ 6,670'
RA tag ~ 6,381'
OBb RA tag ~ 6,115'
OBa RA tag ~ 6,015'
OA RA tag ~ 5,881'
16:00 - 17:00 1.00 CEMT P INT1 Circulate and condition the mud for the cement job while
staging the pumps up to 300 gpm, 530 psi. Hold PJSM with
Schlumberger while circulating and begin hatching up the
cement.
17:00 - 19:30 2.50 CEMT P INTi Land the hanger on the ring and line up to Schlumberger. Drop
PtlMed: 9/5/2006 2:49:57 PM
gp Page 9 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7h 6/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
7/27/2006 17:00 - 19:30 2.50 CEMT P INT1 bottom plug. Pump 5 bbls H2O. Shut down. Pressure test
surface cementing lines to 3,500 psi - OK. Pump 20 bbls
CW-100 followed by 50 bbls 10.5 ppg MudPush Spacer.
Chase the spacer with 58 bbls 15.8 ppg "G" Durablend batched
mixed lead cement ~ 5 bpm, 350 psi. Switch tanks and pump
58 bbls 16.3 ppg "G" Durastone batched mixed tail cement ~ 6
bpm, 300 psi. Shut down, drop top plug and kick out with 5
bbls H2O. Shut down, switch to rig pumps and pump 298 bbls
of seawater ~ ICP - 7 bpm, 150 psi, FCP - 7 bpm, 1,100 psi.
Slow pumps down to 3 bpm, 1,025 psi. Bump plug with
calculated displacement of 298 bbls ~ 96% with 1,600 psi.
Bleed pressure off. Check floats - OK. Bumped plug ~ 1920
7/27/2006. Had full returns throughout job. Stopped pipe
reciprocation with 275 bbls of seawater away.
19:30 -00:00 4.50 CASE P INT1 RD the cement head and the landing joint. Install packoff and
run in the lock down screws - 450 fobs. Pressure test to 5,000
psi and hold for 10 minutes -good. LD the fillup tool and clear
the floor of the cement head, elevators and the long bales.
Changeout to the short bales and elevators.
7/28/2006 00:00 - 03:00 3.00 BOPSU P INTi Flush the stack and install the test plug. Changeout the upper
rams from 7-5/8" to 3-1/2" x 6" variables. RU testing
equipment and test to 250 psi / 3,500 psi -good. RD testing
equipment. Install wear ring.
03:00 - 04:00 1.00 DRILL P PROD1 Bring BHA components to the rig floor.
Simops: Cement compressive strength > 500 psi. Perform
LOT down the 10-3/4" x 7-5/8" OA with 9.1 ppg mud, 550 psi,
2,778' TVD - 12.9 ppg EMW. inject 110 bbls of 9.1 ppg LSND
fluid down the OA to ensure clear - 3 bpm, 850 psi. Freeze
protect OA with 103. bbls dead crude.
Simops: Clean pits for MOBM
04:00 - 04:30 0.50 DRILL P PROD1 PU 6 jts of 4" HT40 DP and stand back 2 stands in the derrick.
Continue Simops operations
04:30 - 09:00 4.50 DRILL P PROD1 PJSM. MU BHAff6 and RIH. Continue Simops operations.
BHA#6: 6-3/4" Hycalog DS146h+gjuw RR w/ 3 x 9's and 3 x
10's, 4-3/4" AIM motor 4R/5S 6 stg, bypass sub wffloat, nm
stab, MW D/LW D, PW D, ADN, 2 x nm flex dc's, circ sub, xo, 1
jst 4" DP, jars
09:00 - 12:00 3.00 DRILL P PROD1 RIH with BHA#6 picking up single joints of 4" HT40 DP from
the pipe shed.
12:00 - 13:00 1.00 DRILL N WAIT PROD1 Shut down due to crew change and Nordic 3 in the road.
13:00 - 13:30 0.50 DRILL P PROD1 Continue RIH with BHAff6 picking up single joints of 4" HT40
DP from the pipe shed.
13:30 - 14:00 0.50 DRILL P PRODt Shallow test the MWD tools -good, 320 gpm, 1,190 psi
14:00.18:00 4.00 DRILL P PROD? Continue RIH with BHA#6 picking up single joints of 4" HT40
DP from the pipe shed.
18:00 - 18:30 0.50 DRILL P PROD1 RIH with 8 stands of 4" HWDP from the derrick.
18:30 -20:00 1.50 DRILL P PRODt Continue RIH with BHA#6 picking up single joints of 4" HT40
DP from the pipe shed.
20:00 -20:30 0.50 DRILL P PROD1 Service and lubricate the rig and the top drive.
20:30 - 21:30 1.00 CASE P PROD1 RU and pressure test the 7-5/8" casing to 3,500 psi. Chart and
Printed: 9/512006 2:49:57 PM
BP Page 10 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours. Task Code NPT` Phase Description of Operations
7/28/2006 20:30 - 21:30 1.00 CASE P PROD1 hold for 30 minutes -good test. RD and blowdown lines.
21:30 - 23:00 1.50 DRILL P PROD1 Wash down and tag the 7-5/8" float collar on depth at 6,586'.
Grill shoe track to 6,668', 250 gpm, 1,190 psi, 40 rpm, 7 k TO,
PU - 150k, SO - 85k, ROT - 115k.
23:00 - 23:45 0.75 DRILL P PROD1 Circulate the hole clean prior to swapping out to MOBM.
23:45 - 00:00 0.25 DRILL P PROD1 Clean out the pill pit and prepare for fluid swap to MOBM.
7/29/2006 00:00 - 00:30 0.50 DRILL P PROD1 Continue to clean out the pill pit and prepare for fluid swap to
MOBM.
00:30 - 01:30 1.00 DRILL P PROD1 Displace the well over from seawater to 9.2 ppg MOBM drilling
fluid.
01:30 - 01:45 0.25 DRILL P PROD1 Drill out the 7-5/8" float shoe, rat hole and 28' of new formation
to 6,708'. Circulate to get the cuttings up the hole and position
the bit inside the 7-5/8" casing.
01:45 - 02:00 0.25 DRILL P PROD1 Perform an FIT to 11.5 ppg EMW with 9.2 ppg MOBM drilling
fluid and 560 psi surface pressure at 4,632' TVD.
02:00 - 03:00 1.00 DRILL P PROD1 Correlate logs from intermediate hole to production hole, take
baseline ECD's and SPR's.
03:00 - 12:00 9.00 DRILL P PROD1 Drill 6-3/4" hole ahead directionally from 6,708' to 7,568', PU -
140k, SO - 75k, ROT - 108k, 306 gpm, 2,645 psi off, 2,825 psi
on, 60 rpm, 5.2 k TO off, 6.5k TO on, AST - 1.88, ART - 2.42,
CECD - 9.97 ppg, AECD - 10.54 ppg. Take surveys every 30'.
12:00 - 00:00 12.00 DRILL P PROD1 Drill 6-3/4" hole ahead directionally from 7,568' to 8,713', PU -
145k, SO - 75k, ROT - 105k, 306 gpm, 2,790 psi off, 2,890 psi
on, 60 rpm, 6 k TO off, 7k TO on, AST - 2.37, ART - 2.93,
CECD - 10.01 ppg, AECD - 10.59 ppg. Take surveys every
30'.
7/30/2006 00:00 - 12:00 12.00 DRILL P PROD1 Drill 6-3/4" hole ahead directionally from 8,713' to 9,965', PU -
155k, SO - 65k, ROT - 105k, 306 gpm, 2,820 psi off, 3,115 psi
on, 60 rpm, 6.8k TQ off, 9.1k TO on, CECD - 10.00 ppg, RECD
- 10.54 ppg, AST - 1.88, ART - 2.77. Take surveys every 30'.
12:00 - 19:30 7.50 DRILL P PROD1 Drill6-3/4" hole ahead directionally from 9,965' to 10,753', PU -
155k, SO - 75k, ROT - 105k, 306 gpm, 2,990 psi off, 3,100 psi
on, 60 rpm, 8k TQ off, 9k TO on, CECD - 10.00 ppg, AECD -
10.67 ppg. Take surveys every 30'. AECD Limbed to 10.81
PPg•
Pumped a 10.8 ppg sweep around at 10,339' with no increase
in cuttings across the shakers.
19:30 - 20:30 1.00 DRILL P PROD1 Circulate for ECD management - 306 gpm, 2,990 psi. CECD -
10.00 ppg. AECD initial -10.81 ppg, AECD final - 10.67 ppg.
20:30 - 00:00 3.50 DRILL P PROD1 Drilt 6-3/4" hole ahead directionally from 10,753' to 10,913', PU
- 155k, SO - 75k, ROT - 105k, 306 gpm, 2,990 psi off, 3,100
psi on, 60 rpm, 8k TO off, 9k TO on, CECD - 10.01 ppg, AECD
- 10.76 ppg, AST - 1.52, ART - 4.67. Take surveys every 30'.
7/31/2006 00:00 - 13:00 13.00 DRILL P PROD1 Drill 6-314" hole ahead directionally from 10,913' to 11,965'
(TD), PU - 155k, SO - 60k, ROT - 105k, 306 gpm, 3,050 psi off,
3,200 psi on, 60 rpm, 8k TO off, 9k TQ on, CECD -10.32 ppg,
AECD - 10.90 ppg, AST - 4.38, ART - 2.88. Take surveys every
30'.
13:00 - 14:30 1.50 DRILL P PROD1 Circulate the well - 310 gpm, 3,225 psi, CECD - 10.32 ppg,
AECD -10.87 ppg.
14:30 -00:00 9.50 DRILL P PROD1 MAD pass / Backream from 11,965' to 9,287' at <600'/hr - 313
gpm, 2,860 psi, 60 rpm, 6k TQ, ROT - 110k, CECD - 10.32
Printed: 9/5/2006 2:49:57 PM
gp Page 11 of 31
- Operations Summaey Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From -To Hours Task Code NPT Phase Description of Operations
7/31/2006 14:30 -00:00 9.50 DRILL P PROD1 ppg, AECD - 10.4 ppg.
8/1/2006 00:00 - 10:30 10.50 DRILL P PROD1 MAD pass / Backream from 9,287' to 7,200' at <600'/hr, slow
BR rate to <100'/hr from 7,200' to 7,000' and then bring rate up
to <600'/hr from 7,000 to 6,680'/hr - 313 gpm, 2,435 psi, 60
rpm, 6k TO, ROT - 106k.
10:30 - 11:00 0.50 DRILL P PROD1 Monitor the well at the shoe -stable. POH to 5,840'.
11:00 - 13:00 2.00 DRILL P PROD1 Service and lubricate the rig and top drive. Slip and cut 64' of
drilling line
13:00 - 14:30 1.50 DRILL P PROD1 RIH from 5,840' to 6,517' and log the RA tags in the 7-5/8"
casing for verification at <200'/hr, 313 gpm, 2,300 psi - 5,881',
6,015', 6,115', 6,380'.
14:30 - 18:00 3.50 DRILL P PROD1 RIH from 6,517' to 11,965'. Precautionary wash the last stand
to bottom.
18:00 - 19:30 1.50 DRILL P PROD1 Pump 15 bbls 10.7 ppg weighted sweep and displace the well
over to SFMOBM - 318 gpm, 3,330 psi, 60 rpm, 7k TO, ROT -
100k.
19:30 - 23:30 4.00 DRILL P PROD1 Monitor the well -stable. MW in - 9.2 ppg, MW out - 9.2 ppg.
POH standing back 4" DP from 11,965' to 6,612' without any
problems, PU - 145k, SO - 75k.
23:30 -00:00 0.50 DRILL P PROD1 Circulate a bottoms up at the shoe -302 gpm, 2,425 psi, 60
rpm, 4k TO.
8/2/2006 00:00 - 03:00 3.00 DRILL P PROD1 Monitor the well -stable. Pump dry job. POH standing back 4"
DP and 4" HWDP from 6,612' to 234'.
03:00 - 04:30 1.50 DRILL P PROD1 PJSM. LD or stand back BHA #6 components. 6-3/4"
DS146h+gjuw graded: 1-3-BT-G-X-1-CT-TD. Clear and clean
the floor.
04:30 - 06:00 1.50 CASE P RUNPRD Clear and clean the floor. Change out the wear ring. RU to run
4.5" 12.6# L-80 BTC slotted and IBT solid liner.
06:00 - 12:00 6.00 CASE P RUNPRD PJSM. PU and RIH with 4.5" slotted shoe joint and 112 jts of
4.5" 12.6# L-80 BTC slotted liner, XO, 8 jts of 4.5" 12.6# L-80
IBT solid liner and four spaceout pups. Each connection
utilized BOL 2000 NM thread lubricant and was torqued to the
mark with 3,800 fdbs.
12:00 - 17:00 5.00 CASE P RUNPRD Make up swell packer assembly and Aluminum Billet on
GS-spear and RIH on 4" DP and HWDP to tag bottom at
11,965'. Ran a total of 122 4.5" x 5.75" x 8" rigid centralizers.
17:00 - 17:30 0.50 CASE P RUNPRD Spot the liner shoe at 11,963', PU - 170k, SO - 70k. Break
circulation at 1.5 bpm, 85 psi and increase rate to 3 bpm, 1,850
psi. Slack off 10k while pumping to release the GS-spear. PU
- 140k, liner is released from aluminum billet -top at 7,018'.
17:00 -22:00 5.00 CASE P RUNPRD POH standing back 4" DP and 4" HWDP to 6,667'. Monitor the
well -stable. Pump a dry job and POH. Break out and LD the
GS spear. Clear and clean the floor.
22:00 - 23:00 1.00 CASE P RUNPRD Service and lubricate the top drive and the rig components.
Changeout the quill.
23:00 -00:00 1.00 BOPSU P RUNPRD Pull the wear ring and flush the BOP stack.
8/3/2006 00:00 - 04:00 4.00 BOPSU P RUNPRD RU testing equipment and test BOPE, Annular and valves to
250/3,500 psi - no failures. RD testing equipment and
blowdown all surface lines. Wkness of the test was waived by
Chuck Schieve of the AOGCC. Witness of the test was
performed by James Franks - BP and Roy Hunt - NAD.
04:00 - 06:30 2.50 DRILL P PROD2 PJSM. MU BHA#7 and RIH.
Printed: 9/5/2006 2:49:57 PM
.. _ . BP Page 12 of 31
-Opera#ions :Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
'Date From - To Hours` Task Code NPT Phase Description of Operations
8/3/2006 04:00 - 06:30 2.50 DRILL P PROD2 BHA#7: 6-3/4" Hycalog DS146h+gjuw w/ 3 x 9's and 3 x 10's,
4-3/4" AIM motor 4R/5S 6 stg, bypass sub w/float, nm stab,
MWD/LWD, PWD, ADN, 2 x nm flex dc's, circ sub, xo, 1 jst 4"
DP, jars
06:30 - 07:00 0.50 DRILL P PROD2 RIH with BHA#7 on 4" DP to 1,190'.
07:00 - 07:30 0.50 DRILL P PROD2 Shallow test the MWD/LWD, 275 gpm, 1,475 psi -good.
07:30 - 09:30 2.00 DRILL P PROD2 Continue RIH with 4° DP and 4" HWDP to 6,800' filling pipe
every 2,500'.
09:30 - 11:00 1.50 DRILL P PROD2 Log down to tie in depths and tag up on the aluminum billet on
depth at 7,018' - 2502 gpm, 2,050 psi, PU - 140k, SO - 85k.
11:00 - 12:00 1.00 DRILL P PROD2 POH to 6,995' and displace the well over from 9.2 ppg
SFMOBM to 9.2 ppg MOBM - 252 gpm, 2,052 psi, PU - 140k,
SO - 85k, ROT - 105k, 45 rpm, 6k TO.
12:00 - 14:30 2.50 DRILL P PROD2 Orient and trench. KO aluminum billet ~ 7,018' and time drill
to 7,024' - 306 gpm, 2,645 psi. Work pipe across the billet
without problems.
14:30 -00:00 9.50 DRILL P PROD2 Drill OBd L1 6-3/4" hole ahead directionally ftom 7,024' to
8,046', PU - 145k, SO - 85k, ROT - 105k, 306 gpm, 2,900 psi
off, 3,000 psi on, 60 rpm, 5k TO off, 6k TO on, AST - 2.55,
ART - 2.55, CECD - 10.18 ppg, AECD - 10.81 ppg. Take
surveys every 30'.
8/4/2006 00:00 - 12:00 12.00 DRILL P PROD2 Drill OBd L7 6-3/4" hole ahead directionally from 8,046' to
9,478', PU - 155k, SO - 75k, ROT - 109k, 306 gpm, 2,960 psi
off, 3,100 psi on, 60 rpm, 7k TO off, 8k TO on, CECD - 10.18
ppg, AECD - 10.76 ppg, AST - 2.83, ART - 4.06. Take surveys
every 30'.
12:00 - 16:30 4.50 DRILL P PROD2 Drill OBd L1 6-3/4" hole ahead directionally from 9,d78' to
10,052', PU - 163k, SO - 68k, ROT - 103k, 306 gpm, 3,100 psi
off, 3,400 psi on, 60 rpm, 7k TO off, 8k TO on, CECD - 1025
ppg, AECD - 11.05 ppg. Take surveys every 30'.
16:30 - 17:00 0.50 DRILL P PROD2 Circulate and condition the mud to reduce ECD's. Pump a
hi-vise sweep surface to surface with -10°~ additional cuttings
coming across the shakers -306 gpm, 3,100 psi. AECD initial
- 11.05 ppg, AECD final -10.79 ppg, CECD -1025 ppg
17:00 -00:00 7.00 DRILL P PROD2 Drill OBd L1 6-3/4" hole ahead directionally from 10,052' to
10,626', PU - 166k, SO - 65k, ROT - 104k, 306 gpm, 3,045 psi
off, 3,300 psi on, 60 rpm, 7k TO off, 8k TO on, CECD - 1028
ppg, AECD - 11.04 ppg, AST - 1.83, ART - 2.68. Take surveys
every 30'.
8/5/2006 00:00 - 04:30 4.50 DRILL P PROD2 Drill OBd L1 6-3/4" hole ahead directionally from 10,626 to
11,200', PU - 166k, SO - 65k, ROT - 104k, 306 gpm, 3,100 psi
off, 3,400 psi on, 60 rpm, 7k TQ off, 8k TO on, CECD - 10.32
ppg, AECD -11.04 ppg. Take surveys every 30'. CECD
recalculated with recent mud properties - 10.14 ppg
04:30 -06:00 1.50 DRILL P PROD2 Circulate to reduce ECD's -306 gpm, 3,100 psi, 60 rpm, 7k
TO. AECD initial -11.04 ppg, AECD final - 10.8 ppg, CECD -
10.16 ppg
06:00 - 12:00 6.00 DRILL P PROD2 Drill OBd L1 6-3/4" hole ahead directionally from 11,200' to
11,626', PU - 165k, SO - 70k, ROT - 103k, 306 gpm, 3,200 psi
off, 3,400 psi on, 60 rpm, 7k TQ off, 8k TQ on, AST - 22, ART
- 3.05, CECD - 10.41, AECD - 1121. Take surveys every 30'.
Pumped a weighted sweep around while drilling ahead
11,322', -10°k additional returns to surface.
Punted: 9/52006 2:49:57 PM
BP
Operations Summary.:. Report
jLegal Well Name:
Common Well Name
Event Name:
Contractor Name:
Rig Name:
L-204
L-204
DRILL+COMPLETE Start: 7/15/2006
NABORS ALASKA DRILLING I Rig Release: 9/3/2006
NABORS 9ES Rig Number:
Page 13 of 31
Spud Date: 7/16/2006
End: 9/3/2006
Date From - To Hours Task Code NPT-
8/5/2006 12:00 - 13:30 1.50 DRILL P
13:30 - 14:30 1.00 DRILL P
14:30 - 15:00 0.50 DRILL P
Phase ( Description of Operations
PR002 Drill OBd L1 6-3/4" hole ahead directionally from 11,626' to
11965' (TD), PU - 155k, SO - 56k, ROT - 99k, 306 gpm, 3,200
psi off, 3,400 psi on, 60 rpm, 7k TO off, 8k TO on, AST - 0.32,
ART - 1.06, CECD - 10.44, AECD - 11.21. Take surveys every
30'.
PROD2 Circulate bottoms up -306 gpm, 3,200 psi, CECD - 10.44 ppg,
AECD - 10.98 ppg, MW in - 9.2 ppg, MW out - 9.2 ppg.
PROD2 Monitor the well -stable. MAD pass out of the hole from
11,965' to 11,869' at <600'/hr, 306 gpm, 3,200 psi, 60 rpm, 7k
TO.
15:00 - 20:30 5.50 DRILL N RREP PROD2 The back up wrench on the top drive came in contact with the
rotary table, causing damage to the pipe handling equipment
and requiring change out. Change out the back up wrench on
the top drive.
20:30 - 00:00 3.50 DRILL P PROD2 Resume MAD pass logging of the hole from 11,869' to 11,009'
at <600'/hr, 306 gpm, 3,200 psi, 60 rpm, 7k TO.
8/6/2006 00:00 - 16:30 16.50 DRILL P PROD2 Continue MAD pass logging of the hole from 11,009' to 7,110'
at <600'/hr, 306 gpm, 2,500 psi, 60 rpm, 7k TO. MAD pass
rate was reduced to <200'/hr from 9,992' to 9,842', 9,547' to
9,397' and 7,222' to 7,110' (bit depth) for caliper log and future
swell packer placement.
16:30 - 17:00 0.50 DRILL P PROD2 Orient 140R and POH from 7,110' and inside the 7-5/8" casing
shoe to 6,612', PU - 140k, SO - 96k.
17:00 - 18:30 1.50 DRILL P PROD2 Service the top drive, blocks and crown. Inspect the draw
works and the brakes. Slip and cut 100' of drilling line.
18:30 - 19:30 1.00 DRILL P PROD2 Drop the ball and open the circ sub. Circulate a bottoms up -
416gpm, 2,100 psi. MW in - 9.2 ppg, MW out - 9.2 PPg•
19:30 - 23:00 3.50 DRILL P PROD2 Monitor the well -stable. Pump dry job and POH standing
back the 4" DP and 4" HW DP to the top of the jars
23:00 -00:00 1.00 DRILL P PROD2 PJSM for LD BHA#7 and handling nuclear source. LD the jars
and ciro sub. Stand back the flex r~llars. Remove the nuclear
source.
8f7/2006 00:00 -00:30 0.50 DRILL P PROD2 Continue to LD BHA#7. LD the ADN, PWD, MWD/LWD, nm
stab, bypass sub, motor and bit. 6-3/4" DS146h+gjuw graded:
0-1-WT-S-X-I-NO-TD
00:30 - 01:00 0.50 DRILL P PROD2 Clear and clean the rig floor.
01:00 - 02:00 1.00 CASE P RUNPRD RU to run 4.5" 12.6# L-80 BTC slotted /IBT solid OBd L-1 liner.
02:00 - 13:00 11.00 CASE P RUNPRD PJSM. PU 4.5" 12.6# L-80 BTC slotted /IBT solid OBd L-1
liner per running detail to 5,736'. Ran 112 joints of 4.5" 12.6#
L-80 BTC slotted liner, 21 joints of 4.5" 12.6# L-80 IBT solid
liner, 3 swell packer assemblies, 7-5/8 x 5-1/2" HMC hanger,
7-5/8" x 5-1/2° HRD ZXP liner top packer w/10.74' tieback,
19.07' Seal Bore Extension. All connections torqued to the
mark with 3,800 ftlbs using BOL2000NM thread lubricant.
13:00 - 17:00 4.00 CASE P UNPRD Crossover and RIH with 4.5" liner on 4" DP and 4" HWDP and
tag bottom at 11,965', PU - 196k, SO - 77k. Break circulation,
drop ball and pump on seat. Pressure up to 2,000 psi to set
the hanger and then pressure up to 3,400 psi and release from
the hanger. Bleed off peessure. PU and then SO with 40k to
set the ZXP liner top packer. Repeat several times with
rotation. Test the liner top packer to 2,000 psi prior to
unstinging from RS packoff -good. PU out of the liner.
t'nrnea: ~rzwis caa:oi rm
gp Page 14 of 31
Operations: Summary :Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/7/2006 13:00 - 17:00 4.00 CASE P RUNPRD
Float Shoe ~ 11,965'
Slotted Liner ~ 9,874' to 11,923'
Swel- Packer ~ 9,850' to 9,860'
Swell Packer ~ 9,431' to 9,441'
Slotted Liner ~ 7,233' to 9,411'
Swell Packer ~ 7,123' to 7,133'
Slotted liner ~ 6,687' to 7,102'
Seal bore extension ~ 6,256' to 6,275'
7.625" x 5.5" HMC liner hanger ~ 6,250'
7.625" x 5.5" HRD ZXP liner top packer w/10.74' tieback
6,229'
17:00 - 18:00 1.00 CASE P RUNPRD Circulate a bottoms up at 412 gpm, 2,115 psi. MW in - 9.2
ppg, MW out - 9.2 ppg.
18:00 - 21:00 3.00 CASE P RUNPRD POH standing back the 4" DP and 4" HWDP. Break out and
LD the liner running tools. Clear and clean the rig floor.
21:00 - 22:30 1.50 STWHIP P WEXIT Bring the milling tools to the rig floor. PJSM. PU and stand
back 9 x 4-3/4" drill collars.
22:30 - 00:00 1.50 STWHIP P WEXIT PJSM. MU OBb L-2 Whipstock BHA.
8/8/2006 00:00 - 02:30 2.50 STWHIP P WEXIT Continue to MU OBb L-2 Whipstock BHA. to 1,174' -dummy
seals w/ nogo shoulder, unloader jar, xo, 15' 4" HT40 pup, xo,
pin x pin xo, anchor, safety disconnect, unloader jar, boot
basket, ported bit sub, whipstock, window mill, lower mill, flex
joint, upper mill, 1 jt 3-1/2" HWDP, float sub, MWD, bumper
sub, 9 x 4-3/4" DC's, xo, 24 x 4" HWDP. Shallow test the
MWD -good.
02:30 - 08:30 6.00 STWHIP P WEXIT RIH with OBb L-2 Whipstock on 4" DP from 1,174' to 6,052',
PU - 190k, SO - 145k
08:30 - 09:00 0.50 STWHIP P WEXIT Orient 20 degrees LHS. RIH and tag the top of the L-1 liner at
6,229'. Set down 20k to set the anchor. Continue to SO to
shear the pin. Top of the slide at 6,169', bottom of the slide at
6,182'.
09:00 - 09:30 0.50 STWHIP P WEXIT Displace the well over to reconditioned 9.2 ppg MOBM - 305
gpm, 2,050 psi.
09:30 - 16:00 6.50 STWHIP P WEXIT Mill window from 6,169' to 6,182' and under gauged open hole
to 6,200', PU - 145k, SO - 88k, ROT - 104k, 60 rpm, 5.3k TO,
300 gpm, 2,000 psi.
16:00 - 16:30 0.50 STWHIP P WEXIT Pump 50 bbl sweep and circulate the hole at 300 gpm, 2,000
psi while working the mills across the window several times.
MW in - 9.2 ppg, MW out - 9.2 ppg.
16:30 - 19:30 3.00 STWHIP P WEXIT Monitor the well -stable. Pump dryjob and POH from 6,200'.
19:30 - 20:30 1.00 STWHIP P WEXIT Stand back the 4-3/4" collars and LD the MWD and milts - in
gauge.
20:30 - 21:00 0.50 STWHIP P WEXIT Flush the BOP stack.
21:00 - 22:30 1.50 DRILL P PROD3 PJSM. MU BHA#9 and RIH.
BHA#9: 6-3/4" Hycalog DS146h+gjuw RR w/ 3 x 9's and 3 x
10's, 4-3/4" AIM motor 4R/5S 6 stg, bypass sub w/float, nm
stab, MWD/LWD, PWD, ADN, 2 x nm flex dc's, circ sub, xo, 1
jst 4" DP, jars
22:30 - 23:00 0.50 DRILL P PROD3 RIH with BHAff9 on 4" DP to 1,095'.
23:00 - 23:30 0.50 DRILL P PROD3 Shallow test the MWD -good.
23:30 -00:00 0.50 DRILL P PROD3 RIH with BHA#9 on 4" DP to 2,147'.
Printed: 9/5/2006 2:49:57 PM
g p Page 15 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/9/2006 00:00 - 02:00 2.00 DRILL P PROD3 Continue RIH with 6-3/4" BHA#9 on 4" DP to 6,100'.
02:00 -03:30 1.50 DRILL P PROD3 Slip and cut drilling line. Service the top drive, draw works and
crown.
03:30 - 04:00 0.50 DRILL P PROD3 Take baseline ECD readings and Orient BHA 20 LHS.
04:00 - 12:00 8.00 DRILL P PROD3 RIH from 6,100' and past the window (6,169' - 6,182') to 6,200'.
Drill6-3/4" OBb L-2 hole ahead directionally from 6,200' to
6,900', PU - 125k, SO - 85k, ROT - 96k, 2,350 psi on, 2,250 psi
off, TO on - 6.5k, TO off - 5.5k, 280 gpm, 60 rpm, AST - 2.53,
ART - 0.89. CECD - 10.15 ppg, AECD - 10.59 ppg
12:00 - 18:30 6.50 DRILL P PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 6,900' to
8,130', PU - 146k, SO - 76k, ROT - 104k, 2,965 psi on, 2,645
psi off, TO on - 8.6k, TO off - 7.6k, 290 gpm, 60 rpm, CECD -
10.07 ppg, AECD - 11.01 ppg. Pumped a 30 bbl, 11.2 ppg
sweep at 7,575' while drilling ahead with -25% additional
cuttings coming across the shakers.
18:30 - 19:00 0.50 DRILL P PROD3 Circulate to reduce ECD's from 11.01 ppg to 10.85 ppg
19:00 -00:00 5.00 DRILL P PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 8,130' to
8,523', PU - 146k, SO - 76k, ROT - 104k, 2,965 psi on, 2,645
psi off, TO on - 8.6k, TO off - 7.6k, 290 gpm, 60 rpm, AST -
2.2, ART - 4.34. CECD - 10.14 ppg, AECD - 10.9 ppg.
Reduced the ROP to control ECD's.
8/10/2006 00:00 - 12:00 12.00 DRILL P PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 8,523' to
9,735', PU - 150k, SO - 80k, ROT - 101 k, 2,850 psi on, 2,570
psi off, TO on - 8.6k, TO off - 7.6k, 285 gpm, 60 rpm, CECD -
10.25 ppg, AECD - 11.07 ppg, AST - 2.45, ART - 3.95.
12:00 -00:00 12.00 DRILL P PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 9,735' to
11,201', PU - 152k, SO - 64k, ROT - 99k, 3,020 psi on, 2,740
psi off, TQ on - 9.1 k, TO off - 7.8k, 290 gpm, 60 rpm, CECD -
10.34 ppg, AECD - 10.89 ppg, AST - 2.25, ART - 4.06.
8/11/2006 00:00 - 02:30 2.50 DRILL P PROD3 Dritl 6-3/4" OBb L-2 hole ahead directionally from 11,201' to
1 t ,456', PU - 152k, SO - 64k, ROT - 99k, 3,020 psi on, 2,740
psi off, TO on - 9.1 k, TQ off - 7.8k, 290 gpm, 60 rpm, CECD -
10.34 ppg, AECD -11.24 ppg.
02:30 - 03:15 0.75 DRILL P PROD3 Circulate bottoms up to reduce ECD's from 11.24 ppg to 10.84
ppg, 285 gpm, 2,900 psi, 60 rpm, 9.Ok TO.
03:15 - 07:00 3.75 DRILL P PROD3 Drill 6-3/4" OBb L-2 hole ahead directionally from 11,456' to
11,910' (TD), PU - 154k, SO - 64k, ROT - 99k, 3,110 psi on,
2,760 psi off, TQ on - 9.2k, TQ off - 8k, 290 gpm, 60 rExn,
CECD - 10.32 ppg, AECD - 11.00 ppg, AST - 0.8 ART - 1.97.
07:00 - 12:00 5.00 DRILL P PROD3 Circulate to get the cuttings away from the BHA and then MAD
Pass /Backream at <600'/hr from 11,910' to 10,627', 280 gpm,
2,760 psi, 60 rpm, 7.8k TO.
12:00 -00:00 12.00 DRILL P PROD3 Continue to MAD Pass /Backream at <600'/hr from 10,627' to
7,473', 280 gpm, 2,645 psi, 60 rpm, 7.8k TO.
8/12/2006 00:00 - 03:15 3.25 DRILL P PROD3 Continue to MAD Pass /Backream at <600'/hr from 7,473' to
6,290', 280 gpm, 2,645 psi, 60 rpm, 7.Sk TO. Pump out of the
hole without rotation from 6,290' to 6,250'. Orient the tool face
to 15 LHS and POH through the window to 6,135'.
03:15 - 04:15 1.00 DRILL P PROD3 Service the top drive, draw works and the crown.
04:15 - 07:30 3.25 DRILL P PROD3 RIH from 6,130'. Wash the last stand down to 11,910'.
07:30 - 08:30 1.00 DRILL P PROD3 Circulate a bottoms up - 290 gpm, 2,940 psi, CECD - 10.34
ppg, AECD - 10.48 ppg.
08:30 - 09:30 1.00 DRILL P PROD3 Displace the well over from 9.2 ppg MOBM to 9.2 ppf SF
YfIMBO: Y/°/[UU6 ca:I:ai rM
gP Page 16 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From = To Hours Task Code NPT Phase Description of Operations
8/12/2006 08:30 - 09:30 1.00 DRILL P PROD3 MOBM - 290 gpm, 3,000 psi, 60 rpm, 9k TO.
09:30 - 14:00 4.50 DRILL P PROD3 MW in - 9.2 ppg, MW out - 9.2 ppg. Monitor the well -stable.
POH standing back 4" DP from 11,910' to 6,135' without
problems.
14:00 - 15:00 1.00 DRILL P PROD3 PJSM. Slip and cut drilling line. Clean underneath the draw
works.
15:00 - 19:00 4.00 DRILL P PROD3 POH standing back 4" DP and 4" HWDP from 6,135' to the top
of the jars on BHA#9 at 234'.
19:00 - 21:30 2.50 DRILL P PROD3 PJSM. LD jars. Stand back flex collars. Remove nuclear
source and LD ADN. LD PWD, MWD, nm stab, bypass sub
w/float, AIM motor and bit. Clear and clean the floor. 6-3/4"
Hycalog DS 146h+gjuw graded: 0-1-WT-S-X-I-NO-TD.
Note: Some damage was observed on the AIM tool.
21:30 - 00:00 2.50 WHIP P RUNPRD PJSM. MU Whipstock Retrieval BHA to 1,506' -retrieving tool,
1 jt 3.5" HWDP, bumper sub, jars, float sub, MWD, xo, 7 stand
of 4" HT40 DP and 8 stands of 4" HWDP.
8/13/2006 00:00 - 02:30 2.50 WHIP P RUNPRD RIH with Whipstock Retrieval BHA on 4" DP to 6,095'.
02:30 - 03:00 0.50 WHIP P RUNPRD Orient the hook to 160 RHS and engage the slot on the
whipstock face at 6,174'. Pull 50k over, fire jars and release
the anchor. POH to 6,091'. Lost 8 bbls of 9.2 ppg SF MOBM
once the anchor released.
03:00 - 03:30 0.50 WHIP P RUNPRD Circulate a bottoms up - 290 gpm, 1,700 psi. MW in - 9.2 ppg,
MW out - 9.2 ppg. Lost 6 bbls of SF MOBM.
03:30 - 07:00 3.50 WHIP P RUNPRD Monitor the well -stable. POH with whipstock from 6,091'.
Lost 18 additional bbls of 9.2 ppg SF MOBM to the hole on the
trip out.
07:00 - 10:00 3.00 WHIP P RUNPRD PJSM. LD Retrieval BHA, Whipstock and all components
below the whipstock. Clear and clean the floor.
10:00 - 11:30 1.50 CASE P RUNPRD RU to run 4.5" slotted liner.
11:30 - 19:30 8.00 CASE P RUNPRD PU 4.5" 12.6# L-80 solid BTC box x IBT p XO bent joint with
float shoe and RIH. PU 138 joints of 4.5" 12.6# L-80 BTC
slotted liner, xo, swell packer assy, 1 joint 4.5" 12.6# L-80 IBT
solid, xo, hook hanger assy and running tool to 5,731'. Each
connection torqued to the mark with 3,800 ft Ibs utilizing
BOL2000NM thread lubricant.
19:30 -00:00 4.50 CASE P RUNPRD RIH with 4.5" liner on a stand of DP. Screw in with the top
drive and circulate to verify nothing is plugged. RIH with 4" DP
and 4" DP to the window and get up and down weights, PU -
100k, SO - 75k. Exit the window on the first attempt and RIH
with 4" DP and 4" HWDP to 11,824'.
8/14/2006 00:00 -00:30 0.50 CASE P RUNPRD PU - 170k, SO - 65k. RIH from 11,824' and run past the
bottom of the window -did not latch. PU and rotate the pipe.
RIH past the top of the window -did not latch. Repeat.
Landed the hook hanger on the 6th attempt. PU and rotate 1/2
turn. Run past the window. Rotate 1/2 turn and re-engage the
window with the hookwall hanger.
Float shoe, PBTMD - 11890'
Swell packer - 6,256' to 6,266'
Top of the Hook Hanger - 6165'
00:30 - 01:00 0.50 CASE P RUNPRD Drop ball and pump on seat. Increase pressure to 3,000 psi to
release the running tool. PU to verity release, PU - 140k.
Printed: 9/5/2006 2:49:57 PM
BP - Page 17 of 31
Operations. Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date 'From - To Hours Task .Code NPT Phase Description of Operations
8/14/2006 01:00 - 02:30 1.50 CASE P RUNPRD Increase pressure to 4,300 psi and shear the ball seat.
Circulate a bottoms up prior to POH. MW in - 9.2 ppg, MW out
- 9.2 PPg•
02:30 - 05:30 3.00 CASE P RUNPRD Monitor the well -stable. Pump SF dry job and POH from
6,159' standing back 4" DP and HWDP.
05:30 - 06:30 1.00 CASE P RUNPRD Breakout and LD the Baker running tools. Clear and clean the
floor. Bring LEM tools to the floor.
06:30 - 07:00 0.50 TIEBAC P OTHCMP Service the top drive.
07:00 - 07:30 0.50 TIEBAC P OTHCMP RU the rig floor to run the 4.5" LEM tieback assy.
07:30 - 12:00 4.50 TIEBAC P OTHCMP PJSM. PU Non locating Seal Assy, 1 ea. 4.5" 12.6# L-80 XO
joint, 2 x 15.09' 4.5" 12.6# L-80 IBT pup jts, LEM Hanger, 1 ea
4.5" 12.6# L-80 IBT-M pup jt, Casing Swivel, 5-1/2" HYD 563 x
4-1/2" IBT XO Bushing, Baker 190-47 Seal Bore Extension,
Baker HRD ZXP Liner Top Packer and RIH with 2/3/8" inner
work string.
12:00 - 16:00 4.00 TIEBAC P OTHCMP RIH with LEM#1 on 4" DP and 4" HWDP to 6,130
16:00 - 16:30 0.50 TIEBAC P OTHCMP Wash down from 6,130' and enter the Seal Bore Extension of
L-1 at 6,256' - 2 bpm, 386 psi. Tag up on depth and set down
30k to ensure locked. PU 15k overpull and ensure locked. Set
back down 30k.
Seals ~ 6264'
Top of LEM ~ 6,108'
16:30 - 17:00 0.50 TIEBAC P OTHCMP Drop 1.75" ball and pump on seat - 3 bpm, 600 psi. Once
seated, increased pressure to 3,000 psi to set the packer. Set
down 70k and increase pressure to 4,200 psi to release from
the LEM. Bleed off pressure and PU with 125k. Close the
annular and test the backside to 1,500 psi -good.
17:00 - 18:00 1.00 TIEBAC P OTHCMP Stand back 3 stands of 4" DP to clear the inner string from the
LEM. Circulate a bottoms up, MW in - 9.2 ppg, MW out - 9.2
ppg. Monitor the welt -stable. Pump SF dry job.
18:00 - 22:30 4.50 TIEBAC P OTHCMP POH to the top of the running tools standing back the 4" DP
and 4" HWDP.
22:30 -00:00 1.50 TIEBAC P OTHCMP Break out and LD the running tool and the inner string
components.
8/15/2006 00:00 -00:30 0.50 TIEBAC P OTHCMP Clear and clean rig floor. Lay down LEM tools off rig floor.
00:30 - 01:00 0.50 STW HIP P WEXIT Pick up whipstock assembly to rig floor
01:00 - 04:30 3.50 STWHIP P WEXIT Make up dummy seal assembly, NO GO, unloader, double pin
sub, anchor, safety disconnect unloader, debris sub, bit sub,
ported sub whipstock, window mill, lower string mill, flex joint,
upper mill, 1 joint HWDP, float sub, MWD, and bumper sub.
04:30 - 06:00 1.50 STWHIP P WEXIT Pick up 3 stands of 43/4" drill collars, cross-over, and 7 stands
4" drill pipe to 1,087'
06:00 - 09:00 3.00 STWHIP P WEXIT Shallow hole test MWD - OK. Pick up 8 stands HWDP and
continue running in hole from 1,087' to 6.032'.
09:00 - 09:30 0.50 STWHIP P EXIT Orient whipstock 7 deg left of high side. PU - 130k, SO - 85k.
Tag up on l2 Tie Back ~ 6,108. Anchor set with 13k down
weight. Pick up to 140k to verify anchor set. Shear mills with
23k down weight. Pick up to open jars. Whipstock set for top
of window ~ 6.064', bottom of window ®6,076'.
09:30 - 18:00 8.50 STWHIP P WEXIT Start displacement from 9.2 ppg SFMOBM to 9.2 ppg MOBM.
Obtain slow pump rates and mill OBa window from 6,064' to
6,076'. Continue milling with window mill to 6,097' placing full
Printed: 81&2006 2:49:57 PM
BP Page 18 of 31
Operations Summary:-:Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
".Date 'From - To Hours 'Task Code NPT Phase Description of Operations
8/15/2006 09:30 - 18:00 8.50 STWHIP P WEXIT gauge upper mill ~t 6,081'. 290 gpm, 1,940 psi, 85-100 rpm,
5.5k TO. PU - 135k, SO - 95k, RT - 113k, WOB - 5-10k.
18:00 - 18:30 0.50 STWHIP P WEXIT Pump 50 bbl super sweep while reciprocating and rotating pipe
through window without extra drag or torque. PU - 135km SO -
95k. Metal cuttings increased appx. 5% with sweep back to
surface. Shut down pumps and rotary and work pipe through
window without any up or down drag. Monitor well - OK. 9.2
PP9 MW
18:30 - 21:30 3.00 STWHIP P WEXIT POH from 6,064 to 418'.
21:30 - 23:00 1.50 STWHIP P WEXIT Stand back drill collars and laydown milling assembly. String
mill in gauge ~ 63/4".
23:00 - 00:00 1.00 STWHIP P WEXIT Clear and clean rig floor. Lay down milling assembly tools off
rig floor.
8/16/2006 00:00 - 01:00 1.00 BOPSU P PROD4 Pull wear bushing. Make up BOP stack jetting tool and jet
stack. Check kill and choke valves. Function pipe rams and
annular preventer. Jet flowline, rig down tools.
01:00 - 03:30 2.50 BOPSU P PROD4 Change out air actuated IBOP on topdrive.
03:30 - 04:30 1.00 BOPSU P PROD4 Rig up to test BOPE.
04:30 - 08:00 3.50 BOPSU P PROD4 Test ROPE to 250 psi low, 3,500 psi high for 5 minutes each
with 4" test joint Perform accumulator test. Witnessing of test
waived by AOGCC rep John Crisp. Test witnessed by BP
WSL's Robert French, Alan Madsen, NAD TP Kelly Cozby.
08:00 - 08:30 0.50 BOPSU P PROD4 Rig down 4" test equipment. Rig up 4 1/2" test equipment.
08:30 - 09:00 0.50 BOPSU P PROD4 Test upper and lower variable bore rams to 250 psi low, 3,500
psi high for 5 minutes each with 4 1/2" test joint.
09:00 - 09:30 0.50 BOPSU P PROD4 Rig down ROPE test equipment. Install wear bushing. Blow
down surface lines.
09:30 - 10:00 0.50 DRILL P PROD4 Pick up BHA tools to rig floor.
10:00 - 12:30 2.50 DRILL P PROD4 PJSM. Pick up and make up 6 3/4" BHA #12, RR Hycalog DS
146 bit, 1.5 bent motor with AIM. Orient and install nuclear
source.
12:30 - 16:00 3.50 DRILL P PROD4 Run in hole from 235' to 5,945'. Shallow hole tested MWD ~
1,000' - OK. Filled pipe ~ 4,056' and 5,945'.
16:00 - 17:00 1.00 DRILL P PROD4 PJSM. Cut and slip drilling line 65'. Install topdrive blower
hose.
17:00 - 17:30 0.50 DRILL P PROD4 PJSM. Service topdrive and crown.
17:30 - 18:00 0.50 DRILL P PROD4 Orient high side. Obtain slow pump rates and benchmark
ECD's - 10.4 ppg. Slide through window and tag bottom
without problem. PU - 120k, SO - 80k, 285 gpm, 2,150 psi.
18:00 - 00:00 6.00 DRILL P PROD4 Directionally drill OBa L3 lateral from 6,097' to 6,446'. 100%
sliding - 2.44 hrs. 285 gpm, 2,150 psi off, 2,300 psi on, PU -
125k, SO - 85k, RT - 100k WOB - 5-10k. CECD - 10.49 ppg,
AECD - 10.03 ppg.
8/17/2006 00:00 - 12:00 12.00 DRILL P PROD4 Directionally drill OBa L3 lateral from 6,446' to 8,046'. 285
gpm, 2,630 psi off, 2,880 psi on, 60 rpm, 7k TQ off, 7.4k TO
on. PU - 142k, SO - 75k, RT - 104k, WOB - 10k. CECD -
10.33 ppg, AECD - 10.85 ppg. AST - 4.16 hrs, ART - 1.58 hrs.
Survey every 30', backream each stand 60' prior to
connections. Pumped 2 Ib over, 35 bbl, weighted sweep ~
7,600' which returned appx 10% increase in cuttings to surface.
12:00 -00:00 12.00 DRILL P PROD4 Directionally drill OBa L3 lateral from 8,046' to 9,766'. 285
gpm, 2,730 psi off, 2,970 psi on, 60 rpm, 9k TQ off, 9.4k TQ
on. PU - 152k, SO - 73k, RT - 102k, WOB - 5-10k. CECD -
PdMed: 9/5/2006 2:49:57 PM
BP Page 19 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABORS 9ES Rig Number:
Date. Prom - To "Hours Task Code.: NPT Phase Description of Operations
8/17/2006 12:00 -00:00 12.00 DRILL P PROD4 10.51 ppg, AECD - 11.31 ppg. AST - 1.85 hrs, ART - 3.19 hrs.
Survey every 30', backream each stand 60' prior to
connections. Pumped 2 Ib over, 35 bbl, weighted sweep ~
9,395' which returned no increase in cuttings to surface.
8/18/2006 00:00 - 12:00 12.00 DRILL P PROD4 Directionally drill OBa L3 lateral from 9,766' to 11,296'. 285
gpm, 3,055 psi off, 3,100 psi on, 60 rpm, 9.6k TO off, 10.1k TO
on. PU - 165k, SO - 60k, RT - 99k, WOB - 5-10k. CECD -
10.61 ppg, AECD - 11.27 ppg, ART - 2.76 hrs, AST - 2.21 hrs.
Survey every 30', backream each stand 60' prior to
connections.
12:00 - 16:00 4.00 DRILL P PROD4 Directionally drill OBa L3 lateral from 9,766' to TD @ 11,296'
MD, 4,623' ND. 285 gpm, 3,070 psi off, 3,210 psi on, 60 rpm,
9.1 k TO off, 9.4k TO on. PU - 175k, SO - 50k, RT - 102k,
WOB - 10k. CECD - 10.67 ppg, AECD - 11.67 ppg, ART - 1.22
hrs, AST - .55 hrs. Survey every 30', backream each stand 60'
prior to connections. Pumped 30 bbl 2 Ib over sweep ~
11,785'.
16:00 - 17:00 1.00 DRILL P PROD4 Finish clearing sweep from annulus with 5% increase in
cuttings back to surface. 285 gpm, 3,080 psi, 60 rpm, 9.1 k TO.
Circulated until AECD's were less than .8 ppg. Monitor well -
OK. MW - 9.2 ppg.
17:00 -00:00 7.00 DRILL P PROD4 MadPass log from 11,985' to 10,110' ~ 600 fph. MadPass log
from 10,110' to 10,053' ~ 200 fph. 285 gpm, 3,067 psi, 60
rpm, 9.5k TO, CECD - 10.67 ppg, AECD - 11.42 ppg.
8/19/2006 00:00 - 13:00 13.00 DRILL P PROD4 MadPass log from 10,053' to 9,870' ~ 200 fph. MadPass tog
from 9,870' to 6,610' ~ 600 fph. MadPass log from 6,610' to
6,490' ~ 200 fph. MadPass log from 6,490' to 6,290' ~ 600
fph. MadPass log from 6,290 to 6,185 ~ 200 fph. Orient high
side and pull into 7 5/8" casing to 5,922'. 285 gpm, 2,680 psi,
60 rpm, 7.4k TO, CECD - 10.49 ppg, AECD - 10.56 ppg. PU -
130k, SO - 85k.
13:00 - 13:30 0.50 DRILL P PROD4 Service topdrrve and crown.
13:30 - 16:30 3.00 DRILL P PROD4 Run in hole from 5,972' to 11,870' without problem.
Precautionary wash from 11,870' to 11,925'
16:30 - 18:00 1.50 DRILL P PROD4 Circulate bottoms up. 290 gpm, 2,990 psi, 60 rpm, 7.3k TQ.
CECD -10.67 ppg, AECD - 10.47 ppg. Prepare mud pits for
SFMOBM.
18:00 - 19:30 1.50 DRILL P PROD4 Displace hole from 9.2 ppg MOBM to 9.2 ppg, 77 vis
SFMOBM. 290 gpm, 3,010 psi, 60 rpm, 10k TO, 106k RWT.
CECD - 10.67 ppg, AECD - 10.67 ppg. Monitor well - OK.
19:30 -00:00 4.50 DRILL P PROD4 Pump dry job and POH from 11,925' to 5,590' without problem.
PU - 175k, SO - 77k. Pumped second dry job ~ 5,972'.
8/20/2006 00:00 - 02:00 2.00 DRILL P PROD4 Continue POH with drilling assembly (BHA #12) from 5,590' to
234'.
02:00 - 03:30 1.50 DRILL P PROD4 PJSM. LD jars. Stand back flex collars. Remove nuclear
source and LD ADN. LD PWD, MWD, nm stab, bypass sub
w/float, AIM motor and bit. 6-3/4" Hycalog DS 146h+gjuw
graded: 0-1-WT-S-X-I-NO-TD.
03:30 - 04:00 0.50 DRILL P PROD4 Clear and clean rig floor.
04:00 -04:30 0.50 WHIP P RUNPRD PJSM. MU Whipstock Retrieval BHA to 1,506' -retrieving tool,
1 jt 3.5" HWDP, bumper sub, jars, float sub, MWD, xo. Orient
MWD 180 deg from retrieval hook.
04:30 - 07:30 3.00 WHIP P RUNPRD Run in hole 7 stands of 4" HT40 DP and 8 stands of 4" HWDP
Printed: 9/5/2006 2:49:57 PM
BP Page 20 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABORS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/20/2006 04:30 - 07:30 3.00 WHIP P RUNPRD then back to drill pipe from 98' to 5,960'. Shallow hole tested
MWD ~ 1,136' - OK. Break circulation every 1,000'.
07:30 - 08:00 0.50 WHIP P RUNPRD Orient hook highside. PU - 135k, SO - 90k. Latched up on first
attempt ~ 6,069'. Picked up to 205k to verify latch without
releasing anchor. Picked up and jar twice with 215k up.
Anchor released on second jar. Pulled seals free and pick up
to 6,040'. Lost 5 bbls of SFMOBM after pulling out of seals.
08:00 - 09:00 1.00 WHIP P RUNPRD Circulate bottoms up ~ 286 gpm, 1,740 psi. Monitor well - OK.
Pump dry job.
09:00 - 13:30 4.50 WHIP P RUNPRD POH from 6,040 to 120' without problem and proper pipe
displacement.
13:30 - 14:30 1.00 WHIP P RUNPRD PJSM. Laydown whipstock retrieval BHA. Break down dummy
seal assembly. 'Whipstock had been milled right of center of
tray, digging into main body of whipstock. Examination of
whipstock explained the reason for the right hand azimuth
swing when drilling out of window. Full window length had
been drilled.
14:30 - 15:00 0.50 WHIP P RUNPRD Clear and clean rig floor.
15:00 - 16:00 1.00 CASE P RUNPRD Rig up to run L3 liner assembly.
16:00 -00:00 8.00 CASE P RUNPRD PJSM. Pick up 4.5" 12.6# L-80 BTC-M solid bent joint with
float shoe. RIH with 41 jts 4.5" 12.6# L-80 BTC slotted liner,
XO, 5 jts solid 4.5" 12.6# L-80 IBT, Swell Packer assembly, 4
jts solid 4.5" 12.6# L-80 IBT, XO, 40 of 75 joints slotted liner to
4,030 ~ end of tour. Make up BTC /IBT liner to 3,800 Ib/Ibs
using Best - O -life 2000 NM. Run floating centralizers on
each joint starting with joint #4 in the hole. Record PU and SO
weights every 1,000' in cased hole.
8/21/2006 00:00 - 02:00 2.00 CASE P RUNPRD Continue running in hole with OBa slotted liner assembly from
4,030' to 5,859'. Run remaining 35 out of 75 joints of slotted
liner, XO, 2 ea spaceout pups, Swell Packer assembly, 8 joints
solid liner, Swell Packer assembly, spaceout pup, XO, Baker
Flanged Hook Hanger assembly. Checked PU and SO weights
every 1,000 tt. in cased hole.
02:00 - 06:00 4.00 CASE P RUNPRD Switch over to drill pipe. RIH 3 stands to 6,147'. Went through
window on second attempt after putting 3/4 tum in pipe. PU -
100k, SO - 75k. Continue running in hole with OBa slotted liner
assembly on 4" drill pipe and 4" HWDP from 6,147' to 11,300'
~ 60 fpm, checking PU and SO weights every 500 ft. in open
hole.
06:00 - 07:30 1.50 CASE P RUNPRD Check parameters. PU - 180k, SO - 65k. Slack off with
indication of top Swell Packer dragging through window, PU -
200k, SO - 55k. Run in hole with Hook Hanger assembly 10'
past window on first attempt. Make several attempts to hook
liner by fuming pipe in 3/4 tum increments. Hang liner on
depth. Pick up and tum pipe 180 deg, slack off and run liner
hook past window. Pick up above window and tum pipe 180
deg, slack off and pick up several times, hooking liner each
time. Set down 20k on hook hanger. Break out topdrive and
drop 29/32" ball. Pump ball down f~ 3 bpm, 620 psi. Slow
pump to 1.5 bpm, 250 psi prior to seat. Seat ball and pressure
up to 3,000 psi and release HR setting tool. Pick up above
hook hanger to 5,993' and confirm release from liner with
pickup weight of 140k. Pressure up to 4,280 psi to shear ball
Printed: 9/5/2005 2:49:57 PM
gp Page 21 of 31
-Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT ` Phase Description of Operations
8/21/2006 06:00 - 07:30 1.50 CASE P RUNPRD seat - OK.
`Ran total of 1 jt 4.5" 12.6# L-80 STL pin X BTC box crossover
solid liner (shoe joint)
116 jts 4.5" 12.6# L-80 BTC slotted liner
17 jts 4.5" 12.6# L-80 IBT solid liner.
Float shoe, PBTMD - 11912'
Swell packer - 9,894' to 9,905'
Swell packer - 6,487' to 6,498'
Swell packer - 6,114' to 6,125'
Top of the Hook Hanger - 6,059'
07:30 - 08:00 0.50 CASE P RUNPRD Circulate bottoms up. 220 gpm, 830 psi. Shut down and
monitor well - OK. MW - 9.2 ppg.
08:00 - 09:00 1.00 CASE P RUNPRD Cut and slip drilling line 98'. Clean and inspect brakes - OK.
09:00 - 12:30 3.50 CASE P RUNPRD Pump dry job and POH from 5,993' to 30'.
12:30 - 13:00 0.50 CASE P RUNPRD PJSM. Service break liner running tools and laydown same.
13:00 - 13:30 0.50 CASE P RUNPRD Clear and clean rig floor.
13:30 - 14:00 0.50 TIEBAC P OTHCMP Pick up LEM running tools to rig floor and rig up running
equipment.
14:00 - 16:30 2.50 TIEBAC P OTHCMP Make up LEM 2. Baker Bent Non-Locating Seal Assembly, 2
ea spaceout pup joints, LEM Hook Hanger Assembly, Swivel
and Seal Bore Extension w/ 19.69'L x 4.75" ID. Rig up false
rotary table and RIH and space out with 23/8" EUE inner
string. Make up Baker ZXP Liner Top Packer w/ 11' L x 5.75"
ID throat. 4.5" IBT connections torqued to 3,800 fUlbs. 5.5"
HYD torqued to 5,800 fUlbs. All connections lubricated with
Best-O-L'rfe 2000.
16:30 - 20:00 3.50 TIEBAC P OTHCMP Run in hole with LEM 2 on 4" drill pipe from 150' to 5,966'.
Check parameters. PU - 137k, SO - 87k.
20:00 - 22:30 2.50 TIEBAC P OTHCMP Attempt to work LEM through Flanged Hook Hanger. Pipe
would take weight at bottom of window ~ 6,076'. Pick up and
work torque by fuming pipe in tension 3/4 toms and work past
bottom of window but only able to go down 5' to 6,081'. Make
numerous attempts by fuming and working pipe to get past
6,081'. If pipe was picked up above the bottom of window, it
would have to be worked through bottom of window again.
Tried to work between 6,076' and 6,081' to get past 6,081'
wfthout success. `6,081 would put the LEM mule shoe in the
L3 lateral assembly just under the HR profile.
22:30 -00:00 1.50 TIEBAC N DPRB OTHCMP POH from 6,082' to 4,627' to drop out the swivel assembly and
change bent seal assembly to a straight seal assembly.
8/22/2006 00:00 - 02:00 2.00 TIEBAC N DPRB OTHCMP Continue POH with LEM 2 from 4,627' to 150'
02:00 - 04:00 2.00 TIEBAC N DPRB OTHCMP PJSM. Laydown packer. Rig up to laydown 23/8" inner string.
Break out swivel assembly, laydown Seal Bore Ext, LEM
Hanger, and laydown bent Seal Assembly.
04:00 - 05:30 1.50 TIEBAC N DPRB OTHCMP Pick up straight Seal Assembly, spaceout pups, LEM Hanger,
pup joint that replaced swivel assembly, Seal Bore Ext. Rig up
and run 23/8" EUE inner string. Make up Baker ZXP Liner Top
Packer.
05:30 - 09:00 3.50 TIEBAC N DPRB OTHCMP Run in hole with LEM 2, Run #2 from 150' to 5,965' on 4" DP
and 4" HWDP. Obtain parameters, PU - 137k, SO - 87k.
09:00 - 10:00 1.00 TIEBAC N DPRB OTHCMP Stack off through top of liner and bottom of window with slight
Printed: 9/5/2006 2:48:57 PM
g p Page 22 of 31
- Operations Summary Report
Legal Well Name: L-204
Common Wetl Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/22/2006 09:00 - 10:00 1.00 TIEBAC N DPRB OTHCMP reductions in slack off weights. Stacked out at 6,081' on every
attempt by fuming pipe in 3/4 tum increments, bouncing pipe,
rotating pipe, all without exiting bottom of window ~ 6,076' and
entering L3 liner.
10:00 - 13:30 3.50 TIEBAC N DPRB OTHCMP Pump dry job and POH from 6,061' to 290' to change out
straight Seal assembly for bent Seal assembly
13:30 - 14:00 0.50 TIEBAC N DPRB OTHCMP PJSM. Rig up to laydown LEM assembly.
14:00 - 16:00 2.00 TIEBAC N DPRB OTHCMP laydown LEM, stand back inner string. No markings on mule
shoe.
16:00 - 16:30 0.50 TIEBAC N DPRB OTHCMP Prepare rig floor, laydown straight Seal assembly, pick up Bent
Seal assembly.
16:30 - 18:00 1.50 TIEBAC N DPRB OTHCMP Pick up bent Seaf Assembly, spaceout pups, LEM Hanger, pup
joint, Seal Bore Ext. Rig up and run 2 3/8" EUE inner string.
Make up Baker ZXP Liner Top Packer.
18:00 - 21:00 3.00 TIEBAC N DPRB OTHCMP Run in hole with LEM 2, Run #2 from 150' to 5,965' on 4" DP
and 4" HWDP. Obtain parameters, PU - 138k, SO - 86k.
21:00 -00:00 3.00 TIEBAC N DPRB OTHCMP Slack off and go through top of liner OK. Tagged up on bottom
of window. Pick up and turn pipe 3/4 turn. Slack off and tag up
~ 6,081'. Pick up and start turning pipe in 1/4 turn increments
starting ®6,063'. Repeat process going down in 1 ft.
increments to bottom of window ~ 6,076' stopping pipe on
torque peaks (same location on pipe each time) then slacking
off on pipe without success tagging up ~ 6,081' every time.
Tried rotating ~ 4 rpm through window without success.
8/23/2006 00:00 - 03:00 3.00 TIEBAC N DPRB OTHCMP Pump dry job. POH from 6,061 to 160'.
03:00 - 05:00 2.00 TIEBAC N DPRB OTHCMP PJSM. laydown LEM #2. Rig up and stand back inner string.
Mule shoe had grooves on the opposite side of where they
were on first run. Grooves ran from bottom of shoe to 18
inches above. Bottom set of seals were damaged.
05:00 - 05:30 0.50 TIEBAC N DPRB OTHCMP Clear and clean rig floor. Pick up dummy LEM to rig floor.
05:30 - 06:00 0.50 TIEBAC N DPRB OTHCMP Make up dummy LEM, XO, float sub, MWD, XO.
06:00 - 08:30 2.50 TIEBAC N DPRB OTHCMP Run in hole with dummy LEM assembly from 67' to 5,968'.
Shallow hole tested MWD ~ 1,105'.
08:30 - 09:00 0.50 TIEBAC N DPRB OTHCMP Fill pipe, break circulation. PU - 140k, SO - 85k. Slack off pipe
to above liner top and orient dummy LEM to 20 deg right of
high side. 308 gpm, 1,730 psi. Slack off and latch up dummy
LEM on liner top. Toolface flopped over to 96 deg right of high
side. Pick up and unlatch from liner. Toolface went from 96
deg to 72 deg. Slack back off and re-latch. Toolface went
back to 96 right. Pick up and unlatch LEM, stand back 1 stand
of drill pipe.
09:00 - 09:30 0.50 TIEBAC N DPRB OTHCMP Circulate bottoms up ~ 6,063' ~ 308 gpm, 1,730 psi.
Observe well - OK. MW - 9.3 ppg.
09:30 - 12:30 3.00 TIEBAC N DPRB OTHCMP Pump dry job. POH from 6,063' to dummy LEM. laydown
dummy LEM assembly.
12:30 - 13:00 0.50 TIEBAC N DPRB THCMP Service topdrive, crown, and drawworks.
13:00 -20:00 7.00 TIEBAC N DPRB OTHCMP Wait on truck to deliver bent 3.5" tubing joint.
20:00 -22:00 2.00 TIEBAC N DPRB OTHCMP Rig up and make up bent joint assembly. 3.5" tubing joint, XO,
4.5" tubing joint, XO, Noat sub, MWD, XO. Maximum OD -
5.23" on 4.5" tubing collar.
22:00 -00:00 2.00 TIEBAC N DPRB OTHCMP Run in hole with bent joint assembly from 124' to 2,400'.
Shallow hole tested MWD ~ 1,527' - OK.
8/24/2006 00:00 -00:30 0.50 TIEBAC N DPRB OTHCMP Run in hole with 3.5" bent joint assembly from 2,400' to 6,034'.
Printed: 9/5/2006 2:49:57 PM
BP Page 23 of 31
-Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16!2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/24/2006 00:00 -00:30 0.50 TIEBAC N DPRB OTHCMP PU - 130k, SO - 85k.
00:30 - 02:30 2.00 TIEBAC N DPRB OTHCMP Fill pipe and break circulation ~ 301 gpm, 1,890 psi. Orient
above liner top ~ 90 deg left. Slack off and tag up ~ 6,070',
pick up and turn pipe 1/8 turn. 'Note: MWD quit giving good
tool faces once inside of liner due to noise. Slack off and tag
up ~ 6,069'. Pick up and tum pipe 118" tum. Tum off pumps
and slack off and go down hole taking 0-7k weight and tag up
~ 6,116' with 15k, with 4.25" OD collar ~ 6,081'. Pick up to
above bottom of window, pulling 30k over pick up weight. Bring
pumps up to 301 gpm, 1,890 psi and slack back off going down
without taking weight. Tag up ~ 6,115' with 15k and 100 psi
increase in pump pressure. Pick up without taking weight and
pump pressure returning to normal. Tum pipe 180 deg, slack
off and tag up ~ bottom of window. Pick up and turn pipe 1/8"
turn. Slack off and run in Mother Bore hole without taking
weight until 6,144' with MWD STAB landing on top of liner.
Bottom of 3.5" mule shoe ~ 6,144' (mule shoe 17' inside of
SBR). Stand back 2 stands with no drag. Observe well - OK.
MW - 9.3 ppg.
02:30 - 05:00 2.50 TIEBAC N DPRB OTHCMP Pump dry job and POH from 6,030' to 133'.
05:00 - 06:00 1.00 TIEBAC N DPRB OTHCMP Rig up and laydown 3.5" bent joint assembly. Small amount of
scarring on 4.5" x 3.5" crossover. Mule shoe OK.
06:00 - 06:30 0.50 TIEBAC N DPRB OTHCMP Clear and clean rig floor.
06:30 - 08:00 1.50 TIEBAC N DPRB OTHCMP Pick up and make up LEM 2, Run #4. Bent non locating seal
assembly with bend ~ 10' up from mule shoe, 7" off center.
Mule shoe oriented 180 deg from previous bent seal assembly,
2 ea 4.5" 12.6# L-80 IBT space out pups, LEM Hanger
assembly, 4.5" IBT pup joint, XO bushing, Baker Seal Bore
Extension w/ 19.69' L x 4.75" ID, rig up and run 23/8" EUE
inner string. Make up Baker ZXP Liner Top Packer w1 11' L x
5.75" throat, Hydraulic setting tool.
08:00 - 11:00 3.00 TIEBAC N DPRB OTHCMP Run in hole from 149' to 6,061'. Make up topdrive.
11:00 - 12:30 1.50 TIEBAC P OTHCMP Fill pipe and break circulation. PU- 135k, SO - 90k. Slack off
and tag up inside of L3 liner ~ 6,081'. Pick up and turn pipe
1/8" turn. Slack off and tag up inside of L3 liner ~ 6,081'. Pick
up and turn pipe 1/8" turn. Slack off and enter Mother Bore
and tag upon top of Seal Bore Extension ~ 6,127'. Pick up
and turn pipe 40 deg. Break circulation and wash down and
enter Seal Bore Extension without any down drag. Slack off
and set with 30k down weight to latch LEM with seal assembly
11 ft inside of Seal Bore Extension. Pick up 25k over string
weight to verify latch-up. Slack off and re-latch LEM with 30k
under slack off weight. Pick up to 125K up weight. Break out
topdrive, drop 13/4" ball and pump same with 3 bpm, 900 psi.
Reduce pump rate to 2 bpm, 610 psi prior to ball landing. Seat
ball and pressure up to 3,000 psi to set packer. Slack off to
105k and increase pressure to 4,000 psi to release HR running
tool. Bleed off pressure and test annulus to 1,500 psi - OK.
Bottom of seals ~ 6,141'
Top of LEM 2 ~ 6,003'
12:30 - 13:00 0.50 TIEBAC P OTHCMP Circulate bottoms up ~ 197 spm, 932 psi. Monitor well - OK.
MW - 9.3 ppg.
Printed: 9/5/2006 2:49:57 PM
gp Page 24 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABORS 9ES Rig Number:
Date From - To Hours Task ' Code NPT Phase Description ofiOperations
8/24/2006 13:00 - 15:30 2.50 TIEBAC P OTHCMP Pump dry job and POH from 6,000' to 145'.
15:30 - 16:30 1.00 TIEBAC P OTHCMP PJSM. Service break running tool. Rig up and laydown 2 3/8"
inner string
16:30 - 17:00 0.50 TIEBAC P OTHCMP Clear and clean rig floor.
17:00 - 19:00 2.00 WHIP P WEXIT PJSM. Pick up and make up Whipstock assembly #3 for OA
window. Seal assy, no go, unloader sub, 1 jt 3.5"HWDP, xo,
PxP sub, safety disconnect, unloader, debris sub, ported sub,
whipstock, window mill, lower mill, flex joint, upper mill, 1 jt 3.5"
HWDP, float sub, MWD, bumper sub, 9 43/4" DC's, 7 stands
4" drill pipe, 8 stands 4" HWDP to 1,855'. Shallow hole tested
MWD ~ 1,098'.
19:00 - 22:30 3.50 WHIP P WEXIT Run in hole with whipstock assembly from 1,855' to 5,967'.
Filled pipe ~ 4,100,'. Make up top drive.
22:30 - 23:00 0.50 WHIP P WEXIT Establish circulation ~ 298 gpm, 2,350 psi. PU - 130k, SO -
85k. Orient whipstock to 13 deg left of high side. Slack off and
stab dummy seals and verify orientation - OK. Slack of 20k to
set anchor. Pick up to 10k over string weight to confirm anchor
set. Slack off and set 30k to shear lugs. Test backside with
1,500 psi - OK. Slowdown lines.
23:00 - 00:00 1.00 WHIP P WEXIT Displace well from 9.3 ppg SF MOBM to 9.2 ppg MOBM ~ 289
gpm, 2,165 psi.
8/25/2006 00:00 - 01:00 1.00 WHIP P WEXIT Continue displacing well from 9.3 ppg SF MOBM to 9.2 ppg
MOBM ~ 289 gpm, 2,165 psi. Obtain slow pump rates.
01:00 - 06:30 5.50 STWHIP P WEXIT Mill OA window starting top of window ~ 5,930 to bottom of
window ~ 5,942'. 247 gpm, 1,415 psi, 60 rpm, 6k TO.
Continue drilling with starting mill from 5,942' to 5,962' putting
upper mill through bottom of window. 247 gpm, 1,385 psi, 105
rpm, 4-5k TO. PU - 125k, SO - 85k, RT - 100k.
06:30 - 08:00 1.50 STWHIP P WEXIT Pump 50 bbl high vis, 2 Ib over weighted sweep while wiping up
and down through window. No increase in cuttings when
sweep returned to surface. Shut down pump and wipe in and
out of window without problem. Monkor well - OK. MW - 9.2
ppg. Pump dry job.
08:00 - 10:00 2.00 STWHIP P WEXIT POH from 5,930' to 372'. PU - 133k, SO - 95k.
10:00 - 11:30 1.50 STWHIP P WEXIT Stand back 43/4" drill collars. Laydown whipstock milling
assembly. Upper mill was in gauge.
11:30 - 12:00 0.50 STWHIP P WEXIT Clear and clean rig floor.
12:00 - 13:00 1.00 BOPSU P WEXIT Pull wear bushing. Make up BOP stack jetting tool and flush
stack and flow line. Function all BOP's. Laydown jetting tool.
Install wear bushing.
13:00 - 14:30 1.50 DRILL P PROD5 PJSM. Pick up and make up OA 63/4" BHA #17, RR Hycalog
DS 146 bit, 1.5 bent motor with AIM, bypass sub w/float, NM
STS, MWD/LWD, orient and load nuclear source, VPWD,
ADN, 2 ea NM flex DC's, Circ sub, XO, 1 joint 4" DP, Jar - 236'.
14:30 - 15:00 0.50 DRILL P PROD5 Run in hole with BHA #17 from 236' to 510'.
15:00 - 15:30 0.50 DRILL P PROD5 Crew held safety meeting with Crane Pro rep. Jason Gammon
and Arctic Wire Rope rep. Gary Moore.
15:30 - 18:00 2.50 DRILL P PROD5 Continue run in hole with BHA #17 from 510' to 5,878'. Shallow
hole tested MWD ~ 1,192'. Filled pipe ~ 4,061'
18:00 - 19:00 1.00 DRILL P PRODS Slip and cut drilling line 98'. Inspect and adjust brakes.
19:00 -20:00 1.00 DRILL P PRODS Service topdrive, crown, blocks, and drawworks.
20:00 -20:30 0.50 DRILL P PRODS Establish circulation. Obtain slow pump rates. CECD - 10.13
ppg. Orient high side and RIH from 5,878', through window
Printed: 9/5/2006 2:49:57 PM
BP Page 25 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABORS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/25/2006 20:00 - 20:30 0.50 DRILL P PROD5 from 5,930' to 5,942' without problem. Continue wash down to
5,962'
20:30 - 21:30 1,00 DRILL P PROD5 Directionally drill 6.75" OA L4 from 5,962' to 5,995' 100%
sliding. 285 gpm, 2,180 psi off, 2,300 psi on, PU - 120k, SO -
85k, WOB - tOk. CECD 10.13 ppg, AECD - 9.93 ppg.
21:30 - 22:00 0.50 DRILL P PROD5 Pump up survey.
22:00 -22:30 0.50 DRILL P PROD5 Directionally drill 6.75" OA L4 from 5,995' to 6,034' 100%
sliding. 285 gpm, 2,180 psi off, 2,300 psi on, PU - 120k, SO -
85k, WOB - 10k. CECD 10.13 ppg, AECD - 9.93 ppg
22:30 - 23:30 1.00 DRILL P PROD5 Pump up survey. Had trouble with pumping surveys up.
Getting spike in the survey frame. Attempted surveys at
different pump rates with both pumps. Checked out both pump
prior to drilling out. Suction and discharge screens had been
cleaned. Both pump pulsation dampeners had correct
pressures. Finally were able to get surveys with some MWD
software adjustments and only using one pump.
23:30 -00:00 0.50 DRILL P PROD5 Directionally drill 6.75" OA L4 from 6,034' to 6,068' 100%
sliding. 285 gpm, 2,180 psi off, 2,300 psi on, PU - 120k, SO -
85k, WOB - 10k. CECD 10.13 ppg, AECD - 9.93 ppg, AST -
.93 hrs.
8/26/2006 00:00 - 12:00 12.00 DRILL P PROD5 Directionally drill 6.75" OA L4 from 6,068' to 6,610'. 290 gpm,
2,380 psi off, 2,832 psi on, PU - 136k, SO - 83k, RT - 106k,
WOB - 5-15k, 60 rpm, 4.5k TO off, 5.5k TO on. CECD 10.21
ppg, AECD - 10.39 ppg. AST - 3.18 hrs, ART - 2.28 hrs.
Survery every joint, backream each stand 60' prior to
connections. Problem found with surveys. # 2 mud pump's
pulsation dampener fill-up needle valve had leaked out
nitrogen. Filled back up with proper nftrogen pressure and
have had no problem with surveys. 'Drilled into OBa ~ 6,125'.
Back into OA ~ 6,272'
12:00 -00:00 12.00 DRILL P PRODS Directionally drill 6.75" OA L4 from 6,610' to 8,334'. 290 gpm,
2,500 psi off, 2,650 psi on, PU - 135k, SO - 85k, RT - 108k,
WOB - 10k, 60 rpm, Sk TO off, 6k TO on. CECD 10.27 ppg,
AECD - 10.35 ppg. AST - 3.4 hrs, ART - 2.25 hrs. Survery
every joint, backream each stand 60' prior to connections.
Started having problem with surveys again. Changed out # 2
mud pump's pulsation dampener while still drilling with 1 pump
~ 290 gpm. Good surveys after dampener changed out.
8/27/2006 00:00 - 12:00 12.00 DRILL P PROD5 Directionally drill 6.75" OA L4 from 8,334' to 9,863'. 290 gpm,
2,736 psi off, 3,010 psi on, PU - 146k, SO - 73k, RT - 103k,
WOB - 5-15k, 60 rpm, 6.4k TO off, 7.8k TD on. CECD 10.31
ppg, AECD - 10.80 ppg. AST - 1.33 hrs, ART - 2.10 hrs.
Survey every 30', backream 60' prior to connections. Pumped
30 bbl high vis, 21b over weighted sweep ~ 9,000' and
returned appx 10% increase in cuttings when back to surface.
12:00 -00:00 12.00 DRILL P RODS Directionally drill 6.75" OA L4 from 9,863' to 11,489'. 290 gpm,
2,890 psi off, 3,100 psi on, PU - 150k, SO - 70k, RT - 106k,
WOB - 5-15k, 60 rpm, 7k TO off, 8k TO on. CECD 10.41 ppg,
AECD - 10.83 ppg. AST - 1.22 hrs, ART - 3.68 hrs. Survey
every 30', backream 60' prior to connections.
8/28/2006 00:00 - 02:30 2.50 DRILL P PRODS Directionally drill 6.75" OA L4 from 11,489' to TD ~ 11,890'
MD, 4,555' TVD. 290 gpm, 2,730 psi off, 3,178 psi on, PU -
159k, SO - 69k, RT - 102k, WOB - 5-15k, 60 rpm, 7.1 k TQ off,
Printed: 9/52006 2:49:57 PM
gp Page 26 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date - ' From - To Hours Task Code NPT °Phase Description ofOpelations
8/28/2006 00:00 - 02:30 2.50 DRILL P PROD5 8.3k TQ on. CECD 10.42 ppg, AECD - 10.82 ppg. AST - .5
hrs, ART - .75 hrs. Survey every 30', backream 60' prior to
connections.
02:30 - 04:00 1.50 DRILL P PROD5 Circulate, rotate and reciprocate for 15 minutes to check ECD's
prior to pumping sweep - OK. Pump 2 Ib weighted sweep
surface to surface with no increase in cuttings when sweep
back to surface. 290 gpm, 2890 psi, 60 rpm, 7.5k TO. CECD
- 10.42 ppg, AECD - 9.99 ppg.
04:00 - 12:00 8.00 DRILL P PROD5 MadPass log from bit depth of 11,890' to 9,576' ~ 600 fph, 290
gpm, 2,850 psi, 60 rpm, 8.1 k TO. CECD - 10.42 ppg, RECD -
9.99 ppg.
12:00 - 00:00 12.00 DRILL P PROD5 MadPass log from bit depth of 9,576' to 6,490'. All depths
logged ~ 600 fph except Swell Packer intervals from 9,110' to
8,970' and 8,610' to 8,470', 6,630' to 6,490' ~ 200 fph. 290
gpm, 2,140 psi, 60 rpm, 4k TO. CECD - 10.15 ppg, AECD -
10.05 ppg.
8/29/2006 00:00 - 02:00 2.00 DRILL P PROD5 Continue Madpass logging from bit depth of 6,490' to 6,160' ~
600 fph, 6,160' to 6,135' ~ 200 fph. 290 gpm, 2,080 psi, 60
rpm, 4.3k TO. Stop rotating, orient bit ~ 10 deg right.
Continue Madpass from 6,135' to 5,973' (Bit depth) without
rotating. Pull 1 more stand to get bit into casing to 5,878'
02:00 - 02:30 0.50 DRILL P PROD5 Service topdrive, blocks, and crown.
02:30 - 05:30 3.00 DRILL P PROD5 Run in hole from 5,878' to 11,776' with one tight spot ~ 9,000'.
Picked up and filled pipe ~ 8,990' and went back down
without problem with pump off. Precautionary wash from
11,776' to 11,890'
05:30 - 08:00 2.50 DRILL P PROD5 Circulate bottoms up ~ 290 gpm, 2,950 psi, 102k rotating
weight, 60 rpm, 7k TO. Prepare to displace to SF MOBM.
08:00 - 09:30 1.50 DRILL P PROD5 Displace hole from 9.2 ppg MOBM to 9.2 ppg SF MOBM ~
290 gpm, 2,950 psi, 102k rotating weight, 60 rpm, 7k TQ.
09:30 - 10:00 0.50 DRILL P PRODS Monitor well - OK. POH from 11,890' to 1.1,383'. Pump dry
job. PU - 173k, SO - 73k.
10:00 - 16:00 6.00 DRILL P PRODS POH from 11,383' to 236'. Recorded up and down weights
every 500' in open hole, and every 1,000' in cased hole.
16:00 - 17:30 1.50 DRILL P PROD5 PJSM. Laydown BHA #17. LD jars. LD flex collars. Remove
nuclear source and LD ADN. LD PWD, MWD, nm stab,
bypass sub w/float, AIM motor and bit. 6-3/4" Hycalog DS
146h+gjuw graded: 0-1-WT-S-X-1-NO-TD (no change from
previous runs).
17:30 - 18:30 1.00 DRILL P PRODS Clear and clean rig floor. Laydown drilling tools off of rig floor.
18:30 - 19:00 0.50 WHIP P RUNPRD PJSM. MU Whipstock Retrieval BHA #18 to 1,506' -retrieving
tool, 1 jt 3.5" HWDP, float sub, MWD bumper sub, xo. Orient
MWD 180 deg from retrieval hook.
19:00 - 22:00 3.00 WHIP P RUNPRD Run in hole with Whipstock retrieval assembly from 99' to
5,904. Shallow hole tested MWD ~ 1,505' - OK
22:00 - 22:30 0.50 WHIP P RUNPRD Check parameters, PU - 135k, SO - 90k. Bring up pumps and
orient 167 deg right. Run in hole slow to below top of window
~ 5,935'. Pick up and latch on 1st attempt. Pick up and shear
anchor ~ 80k over. Slack back down and set down 25k to
close jars. Pick up and jar free on 3rd attempt ~ 65k over pull.
Pull seals out of LEM 2. Lost 10 bbls SF MOBM.
22:30 -00:00 1.50 WHIP P RUNPRD Circulate bottoms up ~ 299 gpm, 1,880 psi. Monitor well - OK.
9.2 ppg MW. Pump dry job.
Printed: 9/52005 2:49:57 PM
gp Page 27 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task. Code NPT Phase Description of Operations
8/30/2006 00:00 - 02:30 2.50 WHIP P RUNPRD POH with L4 whipstock #3 from 5,935' to 99'.
02:30 - 03:30 1.00 WHIP P RUNPRD PJSM. Laydown whipstock retrieval BHA. Break down dummy
seal assembly. 'Whipstock had indication of 8 ft window cut.
Had slight right hand roll-off ending appx 20 deg right at bottom
of slide.
03:30 - 04:00 0.50 WHIP P RUNPRD Clear and clean rig floor.
04:00 - 05:00 1.00 CASE P RUNPRD Rig up to run L4 slotted 4.5" liner assembly. Pick up pup joint
and crossovers to rig floor.
05:00 - 12:00 7.00 CASE P RUNPRD PJSM. Pick up and make up solid joint with shoe, 69 jts slotted
liner, xo, pup jt, Swell Packer assy, 10 jts solid liner 3 ea pup
jts, Swell Packer assy, xo, 48 jts slotted liner, xo, pup jt, Swell
Packer assy, 10 jts solid liner, 2 pup jts, Swell Packer assy, xo,
Flanged Hook Hanger assy with swivel to 5,959'. 3,800 fUlbs
make up torque, lubricated with Best-O-Life 2,000.
Ran total of:
21 jts (incl x-over bent jt with shoe) 4.5" 12.6# L-80 IBT solid
liner.
118 jts 4.5" 12.6# L-80 BTC r3 slotted liner.
4ea 4.5" x 6.3" OD Swell Packer assemblies
7 IBT spaceout pups
4 crossover pups
137 53/4" x 4.5" x 8"L straight blade centralizers on joints 2 -
138
2 centralizers on each side of Swell Packers for total of 145
centralizers.
12:00 - 13:00 1.00 CASE P RUNPRD Make up crossover and 1 stand drill pipe. PU - 100k, SO - 70k.
Pick up above window ~ 5,930'. Check rpm and torque. 7
rpm, 2.5k TO, RWT - 90k. Run in hole and tag up ®6,018'
with 5k. Pick up above window and tum string 180 deg. Run in
hole and tag up ~ 6,018' with 5k. Pick up above window and
tum string 90 deg. Run in hole and tag up ~ 6,018' with 5k.
Pick up to 5,935' and rotate ~ 7 rpm, catch torque peak ~
3.6k and run in L4 hole OK to 6,057'
13:00 - 16:30 3.50 CASE P RUNPRD Continue run in hole with slotted liner assembly from 6,057' to
11,853'. Record pick up and slack off weights every 500'.
16:30 - 18:00 1.50 CASE P RUNPRD Break circulation and obtain parameters. PU - 170k, SO - 70k.
Run in hole and hook liner. Pick up and slack off and hook
hanger again. Pick up and tum pipe 180 deg. Run in hole past
window 10' several times. PU - 190k, SO - 70k. Pick up and
tum pipe 180 deg and make several attempts before hooking
hanger again. Pick up and set down on hanger several times
with 25k - OK. Break out surface pipe connection and drop
ball. Pump ball down ~ 2.5 bpm, 535 psi. Slow pump rate to
1.5 bpm, 390 psi prior to ball seating. Seat ball and pressure
up to 3,080 psi to shear HR running tool. Pressure up to 4,300
psi to shear ball seat. Pick up and confirm liner release with
running tool above top of L4 liner top to 5,892'. PU - 135k.
Liner set with shoe ~ 11,879'
Swell Packer ~ 8,935 to 8,945'
Swell Packer ~ 8,464' to 8,474'
Swell Packer ~ 6,457' to 6,467'
Printed: 9/5/2006 2:49:57 PM
gp Page 28 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours 'Task 'Code .NPT Phase Description of Operations
8/30/2006 16:30 - 18:00 1.50 CASE P RUNPRD Swell Packer ~ 5,974' to 5,984'
Top of L4 liner ~ 5,925'
18:00 - 19:00 1.00 CASE P RUNPRD Circulate bottoms up ~ 260 gpm, 1,155 psi. Monitor well - OK
MW 9.3 PPg•
19:00 - 20:00 1.00 CASE P RUNPRD Cut and slip drilling line 80'.
20:00 - 23:30 3.50 CASE P RUNPRD Pump dry job. PU - 135k, SO - 70k. POH from 5,892' to
running tool. Make service breaks on running tool and
laydown. 'Layed down 9 joints 43/4" drill collars on trip out of
hole.
23:30 - 00:00 0.50 CASE P RUNPRD Clear and clean rig floor.
8/31/2006 00:00 -00:30 0.50 BOPSU P RUNPRD Flush stack. Pull wear bushing, install BOP test plug.
00:30 - 01:00 0.50 BOPSU P RUNPRD Rig up to test BOPE.
01:00 - 05:00 4.00 BOPSU P RUNPRD Pressure test BOPE to 250 psi low, 3,500 psi high for 5
minutes each on all equipment. Tested variable bore rams with
4" and 4.5" test joints. Perform accumulator test. Witnessing
of test waived by AOGCC rep Lou Grimaldi. Test witnessed by
BP WSL R. French and NAD TP R. Hunt.
05:00 - 05:30 0.50 BOPSU P RUNPRD Rig down test equipment. Pull test plug, install wear. bushing.
05:30 - 06:30 1.00 TIEBAC P OTHCMP Rig up to run L4 LEM #3.
06:30 - 08:00 1.50 TIEBAC P OTHCMP Pick up and make up L4 LEM 3 assembly. Baker
Non-Locating Seal Assembly, 1 ea 4.5" 12.6# L-80 IBT box X
STL pin x-over joint, 1 ea 4.5" 12.6# L-80 IBT liner joint, LEM
Hook Hanger Assembly, 1 ea IBT space out pup. Rig up false
rotary table and RIH and space out with 23/8" EUE inner string
with 1.75' stickout. Make up Baker ZXP Liner Top Packer w/
11' L x 5.75" ID throat. 4.5" IBT connections torqued to 3,800
ft/Ibs. All connections lubricated with Best-O-Life 2000.
08:00 - 10:00 2.00 TIEBAC P OTHCMP Run in hole with LEM assembly on 4" drill pipe and HWDP
from 169' to 5,880'.
10:00 - 12:00 2.00 TIEBAC P OTHCMP Obtain parameters. PU - 135k, SO - 85k , 118 gpm, 580 psi.
Wash down from 5,880' through hook hanger and observe
seals entering LEM #2 SBE. Latch up LEM #3 on L4 liner top
on depth. Set down 30k, pick up 15k over string weight to 150k
to release LEM. Slack off and re-latch LEM. Set down 30k.
Pick up 10k over string weight to confirm latch-up. Drop ball
and pump same to seat ~ 3 bpm 650 psi. Seat ball and
pressure up to 4,000 psi to set packer and release running tool.
Packer set indication ~ 3,100 psi. Bleed off pressure, close
rams, and pressure up annulus to 1,500 psi for 10 minutes to
confirm packer setting. Good test. Pick up to 5,976' (inner
string depth)
Bottom of seals ~ 6,036' (13.45 tt inside of LEM #2 SBE)
Top of LEM #3 ZXP liner top packer ~ 5,878'
12:00 - 15:00 3.00 TIEBAC P OTHCMP Displace well from 9.3 ppg SF MOBM to 9.2 NaCI brine.
Pumped 30 bbls LVT-200 base oil followed by 25 bbls
viscosified 9.2 ppg brine, followed by 50 bbls of Safe Surf O
mixed with 9.2 ppg brine, followed by clean 9.2 ppg brine.
Pumped until clean brine returned to surface. 218 gpm, 415
psi.
15:00 - 17:00 2.00 TIEBAC P OTHCMP Observe well - OK. Clean surface mud equipment. Clean out
from under shakers, mud troughs and possum belly.
17:00 -00:00 7.00 TIEBAC P OTHCMP POH laying down drill pipe and HWDP from 5,946' to 750'
P~Med: 9/52006 2:49:57 PM
gp Page 29 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
9/1/2006 00:00 - 00:30 0.50 TIEBAC P OTHCMP Continue POH with LEM running tool laying down drill pipe
from 750' to running tool and inner string ~ 140'.
00:30 - 01:30 1.00 TIEBAC P OTHCMP Laydown running tool. Rig up and laydown 23/8" EUE inner
string. Clear rig floor.
01:30 - 03:00 1.50 TIEBAC P OTHCMP Run in hole to 3,252' with half of drill pipe out of derrick. 4"
mule shoe on bottom of drill pipe.
03:00 - 03:30 0.50 TIEBAC P OTHCMP Circulate 30 bbl brine soap pill surface to surface to clear drill
pipe of SF MOBM. 294 gpm, 306 psi. PU - 89k, SO - 69k.
MW - 9.2 PP9
03:30 - 06:30 3.00 TIEBAC P OTHCMP Monitor well. POH laying down drill pipe from 3,252' to surface
06:30 - 08:00 1.50 TIEBAC P OTHCMP Run in hole to 3,186' with half of drill pipe out of derrick. 4"
mule shoe on bottom of drill pipe.
08:00 - 08:30 0.50 TIEBAC P OTHCMP Circulate 30 bbl brine soap pill surface to surface to clear drill
pipe of SF MOBM. 294 gpm, 306 psi. PU - 89k, SO - 69k.
MW - 9.2 PP9
08:30 - 12:00 3.50 TIEBAC P OTHCMP Monitor well. POH laying down drill pipe from 3,186' to surface.
Laydown mule shoe.
12:00 - 12:30 0.50 TIEBAC P OTHCMP Clear and clean rig floor. Pull wear bushing.
12:30 - 14:30 2.00 BUNCO RUNCMP Rig up to run 4.5" 12.6# 13Cr80 r3 Vam Top completion string.
Change out bales. Rig up compensator, rig up I-Wire spool
and sheeve.
14:30 - 15:30 1.00 BUNCO RUNCMP PJSM with all personnel involved. Pick up completion jewelry
as per detail to the Phoenix CST Jet pump gauge. ~ 99'.
Hook up I-Wire to Phoenix assembly.
15:30 - 00:00 8.50 BUNCO RUNCMP Continue running in hole with tubing jewelry and tubing from 96'
to 4,885'
9/2/2006 00:00 - 01:30 1.50 BUNCO RUNCMP Continue running in hole with 4.5" 12.6# 13Cr80 Vam Top
completion string from 4,885' to 5,803'
01:30 - 02:30 1.00 BUNCO RUNCMP Space out tubing for bottom of mule shoe placement ~ 5,886'.
Tagged up on bottom of Tie Back Sleave ~ 5,889'. Lay down
3 joints of tubing, pick up 2 ea space-out pups, pick last joint of
tubing. Pick up and make up tubing hanger and landing joint.
02:30 - 03:30 1.00 BUNCO RUNCMP Make 1-Wire connection throught tubing hanger. Test hydraulic
fitting to 5,000 psi - 5 minutes - OK. Test I-Wire continuity -
OK. Terminate I-Wire connection end, wrap around hanger
neck.
03:30 - 04:00 0.50 BUNCO RUNCMP Drain BOP stack. Land tubing. PU - 94k, SO - 75k. Run in
tubing hanger lock-down screws.
Ran total of 133 jts, 5,580' 4.5" 12.6# 13Cr80 r3 Vam Top
tubing joints.
75 ea I-Wire Fult Clamps
3 ea I-Wire Half Clamps
Mule shoe ~ 5886' (8 ft inside of L4 LEM #3 Tie Back
Tops:
4.5" TCII HES "X" Nipple 3.813" ID ~ 5,860'
4.5" TCII HES "X" Nipple 3.813" ID w/ RHC plug ~ 5,839'
7.625" x 4.5" Baker Premier Packer ~ 5,812'
Phoenix CST Jet Pump Gauge ~ 5,790'
4.5" 13Cr HES "XD" Duro Sliding Sleeve ~ 5,769'
4.5" Phoenix Discharge Pressure Sensor ~ 5,758'
GLM #1 - 4.5" 1" KBG-2, 9Cr, w/ DCK-2 Shear & BEK latch ~
Printed: 9/5!2006 2:49:57 PM
gp Page 30 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: 7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From ->To Hours Task Code NPT Phase Description of Operations
9/2/2006 03:30 - 04:00 0.501 BUNCO RUNCMP 5,648'.
GLM #2 - 4.5" 1" KBG-2, 9Cr, w/ RD Dummy, SBK-2C latch ~
5,537'
GLM #3 - 4.5" 1" KBG-2, 9Cr, w/ RD Dummy, SBK-2C latch ~
4,590'
GLM #4 - 4.5" 1" KBG-2, 9Cr, w/ RD Dummy, SBK-2C latch ~
3,011'
4.5" TCII HES "X" Nipple 3.813" ID ~ 2,192'
2 ea 4.5" 12.6# 13Cr80 r3 Vam Top tubing space out pups
under top joint of tubing.
j FMC Tubing Hanger with 1 ft of Blast Rings below hanger on
pup jt with 4.5" TCII lifting threads.
04:00 - 07:00 3.00 BUNCO RUNCMP Rig up to circulate. Reverse circulate complete hole volume
with 245 bbls of clean 9.2 ppg NaCI brine ~ 125 gpm, 250 psi,
followed by 90 bbls of clean 9.2 ppg NaCI brine, followed by 87
bbls 9,2 ppg NaCI brine treated with corrosion inhibitor,
followed by 68 bbls of clean 9.2 ppg NaCI brine.
07:00 - 10:00 3.00 BUNCO RUNCMP Drop 1 7/8" ball and rod. Wait to seat. Pressure up to 4,000
psi to set packer. Hold 4,000 psi for 30 minute tubing test -
OK. Bleed tubing pressure down to 2,500 psi. Pressure up
annulus to 3,500 psi for packer and casing test - 30 minutes -
OK. Bleed off annulus pressure to 0 psi, bleed off tubing
pressure to 0 psi. Pressure up and shear out DCK valve with
2,800 psi. Pump through valve a few bbls each way to confirm
opening of valve.
10:00 - 10:30 0.50 BUNCO RUNCMP Install 2-way-check valve. Test valve by pressuring up annulus
to 1,000 psi - OK
10:30 - 12:00 1.50 BUNCO RUNCMP Rig down liner running equipment. Clear and clean rig floor.
12:00 -00:00 12.00 CLEAN P POST Start MOBM cleanup of derrick windwalls, pull floor mats and
clean rig floor and pipe racks. Clean out drip pan. Clean mud
pits and mud room of oil base mud.
9/3/2006 00:00 - 03:00 3.00 CLEAN P POST Continue cleaning rig Clean derrick windwalls, pull floor mats
and clean rig floor and pipe racks. Clean out drip pan. Clean
mud pits and mud room of oil base mud.
03:00 - 04:00 1.00 BOPSU P RUNCMP Nipple down BOP stack. Disconnect turnbuckles, pull riser, set
stack on BOP stand.
04:00 - 06:30 2.50 WHSUR P RUNCMP Clean top of tubing hanger. Run I-Wire through tree adaptor
flange. Nipple up tree adaptor flange with 1-Wire oriented
towards reserve pit. Test adapter flange to 5000 psi
06:30 - 09:00 2.50 WHSUR P RUNCMP Nipple up tree and test to 5,000 psi
09:00 - 10:00 1.00 WHSUR P RUNCMP Rig up DSM Lubricator and pull TWC, rig down lubricator
10:00 - 13:00 3.00 WHSUR P RUNCMP PJSM, Rig up Little Red and test lines to 3,000 psi, Freeze
protect tubing and IA to 2,550' with 106 bbls diesel ~ 2.5 bpm,
ICP 550 psi, FCP 900 psi.
13:00 - 14:00 1.00 WHSUR P RUNCMP Allow diesel to U-Tube. Final SIP's: OA - 0 psi, IA - 70 psi,
Tbg - 0 psi.
14:00 - 15:00 1.00 WHSUR P RUNCMP Install BPV w/ lubricator and test from below to 1,000 psi,
Remove double annulus valve on tubing head, install VR plugs,
secure well for move.
Release Rig from L-204 ~ 15:00 hrs, 9/3/2006 for 2006 Yearly
Printed: 9/5/2006 2:49:57 PM
BP Page 31 of 31
Operations Summary Report
Legal Well Name: L-204
Common Well Name: L-204 Spud Date: 7/16/2006
Event Name: DRILL+COMPLETE Start: .7/15/2006 End: 9/3/2006
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/3/2006
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT .Phase Description of Operations
9/3/2006 14:00 - 15:00 1.00 WHSUR P RUNCMP Maintenance
Printed: 9/5/2006 2:49:57 PM
by
~~~ ~~~~
.~~~~ ~~~
L-204L3 Su
Report Schlumberger
Report Date: 19-Aug-O6
Client: BP Exploration Alaska
Field: Prudhoe Bay Unit - WOA
Structure /Slot: L-PAD / S-U
Well: L-204
Borehole: L-204L3
UWIIAPI#: 500292331462
Survey Name /Date: L-204L3 /August 19, 2006
Tort /AHD / DDI / ERD ratio: 439.269° / 9564.37 ft / 7.035 / 2.069
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet
Location LaULong: N 70.35026009, W 149.32311435
Location Grid NIE Y/X: N 5978146.730 ftUS, E 583371.740 ftUS
Grid Convergence Angle: +0.63747117°
Vertical Section Azimuth: 104.910°
Vertical Section Origin: N 0.000 ft, E 0.000 it
TVD Reference Datum: Rotary Table
TVD Reference Elevation: 78.60 fi relative to MSL
Sea Bed /Ground Level Elevation: 49.75 tt relative to MSL
Magnetic Declination: 23.964°
Total Field Strength: 57622.196 nT
Magnetic Dip: 80.884°
Declination Date: August 22, 2006 .
Magnetic Declination Model: BGGM 2006
North Reference: True North
ToWI Corr Mag North -> True North: +23.964°
Local Coordinates Referenced To: Well Head
Comments Measured Inclination Azimuth SulrSea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
n de de n n n n n n n de 100 n nUS ftUS
Hlt U.UU U.UU U.UU -/tS.bU U.VV V.UU V.UU V.UV U.VV V.VV V.UU 0~/0140./J JOJJ/ I./W IV /V.JOVLOVV~ VV 14~.JGJ114J0
GYD GC SS 100.00 0.85 12.39 21.40 100.00 -0.03 0.74 0.74 0.72 0.16 0.85 5978147.46 583371.89 N 70.35026207 W 149.32311306
166.00 1.26 13.33 87.39 165.99 -0.07 1.96 1.96 1.91 0.43 0.62 5978148.64 583372.15 N 70.35026531 W 149.32311085
261.00 1.00 28.99 182.37 260.97 0.10 3.82 3.80 3.65 1.07 0.42 5978150.39 583372.77 N 70.35027006 W 149.32310563
351.00 1.31 131.89 272.36 350.96 1.21 5.21 4.27 3.65 2.22 2.02 5978150.40 583373.92 N 70.35027006 W 149.32309632
443.00 4.58 153.98 364.22 442.82 4.55 9.89 4.63 -0.35 4.62 3.70 5978146.43 583376.36 N 70.35025912 W 149.32307688
533.00 6.02 158.29 453.84 532.44 9.72 18.20 11.25 -7.97 7.94 1.66 5978138.85 583379.77 N 70.35023832 W 149.32304991
626.00 7.28 140.25 546.22 624.82 17.44 28.88 21.74 -17.03 13.51 2.61 5978129.85 583385.44 N 70.35021356 W 149.32300467
720.00 8.24 132.06 639.36 717.96 28.29 41.55 34.36 -26.12 22.32 1.56 5978120.86 583394.35 N 70.35018873 W 149.32293315
813.00 8.53 135.67 731.37 809.97 40.15 55.11 47.87 -35.52 32.09 0.65 5978111.57 583404.22 N 70.35016305 W 149.32285386
Last GYD GC SS 875.00 9.83 127.28 792.57 871.17 48.99 64.98 57.68 -42.02 39.51 3.00 5978105.16 583411.71 N 70.35014531 W 149.32
'
9
First MWD+IFR+MS 941.45 11.66 111.02 857.87 936.47 60.92 77.29 69.43 -47.86 50.30 5.30 5978099.43 583422.56 '
1
N 70.35012933 W 149.32
1037.16 15.11 111.81 950.97 1029.57 82.93 99.44 90.34 -55.97 70.91 3.61 5978091.56 583443.27 N 70.35010719 W 149.322 8
1132.97 19.34 108.37 1042.46 1121.06 111.17 127.80 117.59 -65.61 97.58 4.54 5978082.21 583470.03 N 70.35008084 W 149.32232224
1229.64 23.03 106.69 1132.58 1211.18 146.06 162.73 151.40 -76.09 130.89 3.87 5978072.11 583503.46 N 70.35005221 W 149.32205178
1324.32 25.69 102.66 1218.83 1297.43 185.09 201.76 189.28 -85.91 168.67 3.31 5978062.71 583541.33 N 70.35002538 W 149.32174516
1420.06 30.67 99.73 1303.20 1381.80 230.18 246.95 233.07 -94.59 213.01 5.40 5978054.52 583585.77 N 70.35000167 W 149.32138518
1515.04 36.39 97.47 1382.35 1460.95 282.28 299.39 283.96 -102.36 264.87 6.16 5978047.34 583637.70 N 70.34998045 W 149.32096422
1610.55 42.03 95.77 1456.32 1534.92 341.99 359.74 342.70 -109.26 324.82 6.01 5978041.10 583697.72 N 70.34996159 W 149.32047754
1711.65 40.01 95.64 1532.60 1611.20 407.49 426.09 407.65 -115.86 390.84 2.00 5978035.24 583763.81 N 70.34994355 W 149.31994159
1807.00 41.19 96.35 1604.99 1683.59 468.79 488.14 468.80 -122.34 452.55 1.33 5978029.44 583825.58 N 70.34992583 W 149.31944065
1902.84 39.77 96.73 1677.89 1756.49 530.34 550.36 530.39 -129.42 514.36 1.50 5978023.05 583887.46 N 70.34990647 W 149.31893888
1998.47 41.97 96.35 1750.20 1828.80 592.25 612.93 592.48 -136.55 576.53 2.32 5978016.62 583949.69 N 70.34988700 W 149.31843425
SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204L3\L-204L3 Generated 10/2/2006 12:57 PM Page 1 of 7
Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude~
Depth Section Departure
ft de de n n n ft ft n ft de 100 n nUS ftUS
"LUy4.14
2189.87
2285.57
2381.11
2477.10
2572.36
2668.18
2764.00
2859.46
2954.76
3050.79
3146.15
3241.60
3337.25
3412.18
3510.50
3606.56
3701.74
3797.81
3893.70
3989.02
4084.90
4180.57
4276.33
4371.36
4467.82
4562.97
44.155 yb.Ub 1151 y.by 12fytS .Ly bb/.'L:i b/tf .t5/ bb/./b -74;S.b4 b41.t5t5 ;S.UL 5y/25Ul U.Lb
47.22 96.54 1886.15 1964 .75 725.35 747 .57 726.28 -151.20 710.36 2.50 5978003.45
50.89 96.76 1948.85 2027 .45 796.87 819 .84 798.26 -159.58 782.15 3.84 5977995.88
49.73 96.68 2009.87 2088 .47 869.64 893 .36 871.54 -168.18 855.16 1.22 5977988.09
50.42 96.89 2071.47 2150 .07 942.52 966 .97 944.96 -176.88 928.26 0.74 5977980.21
51.15 96.59 2131.70 2210 .30 1015.57 1040 .78 1018.59 -185.54 1001.55 0.80 5977972.36
49.72 96.60 2192.73 2271 .33 1088.66 1114 .64 1092.30 -194.02 1074.93 1.49 5977964.70
50.25 96.37 2254.34 2332.94 1161.25 1188 .03
50.30 96.81 2315.35 2393.95 1233.90 1261 .45
50.37 96.20 2376.18 2454.78 1306.47 1334 .81
50.20 96.28 2437.54 2516.14 1379.50 1408 .68
49.93 96.13 2498.75 2577.35 1451.78 1481 .80
50.12 96.26 2560.07 2638.67 1524.08 1554 .94
50.04 96.54 2621.45 2700.05 1596.63 1628 .30
49.40 96.45 2669.90 2748.50 1653.18 1685 .47
49.38 95.86 2733.90 2812.50 1726.95 1760 .11
48.75 97.03 2796.84 2875.44 1798.72 1832 .67
49.73 96.79 2858.98 2937.58 1870.11 1904 .77
51.14 95.12 2920.17 2998.77 1943.26 1978 .82
50.93 93.93 2980.47 3059.07 2016.60 2053 .38
50.62 94.78 3040.75 3119.35 2089.19 2127 :22
50.09 94.60 3101.92 3180.52 2161.84 2201 .05
49.73 94.27 3163.53 3242.13 2233.81 2274 .24
49.24 94.88 3225.74 3304.34 2305.43 2347 .04
49.19 95.48 3287.82 3366.42 2376.35 2418 .99
48.78 95.70 3351.12 3429.72 2448.17 2491 .77
50.82 95.77 3412.53 3491.13 2519.91 2564 .45
1165.54
1238.84
1312.08
1385.83
1458.84
1531.89
1605.17
1662.28
1736.83
1809.34
1881.40
1955.38
2029.76
2103.42
2177.11
2250.15
2322.83
2394.70
2467.43
2540.06
4658.78 51.00 96.65 3472.95 3551.55 2593.42 2638.81 2614. 40
4754.14 51.01 96.40 3532.95 3611.55 2666.74 2712.92 2688. 50
4849.66 50.93 96.02 3593.10 3671.70 2740.09 2787.12 2762. 68
4944.97 50.49 96.74 3653.46 3732.06 2813.04 2860.89 2836. 43
5041.18 50.39 96.73 3714.73 3793.33 2886.46 2935.06 2910. 59
5136.35 50.47 97.34 3775.36 3853.96 2959.13 3008.42 2983. 95
5232.61 49.20 96.26 3837.45 3916.05 3031.95 3081.98 3057. 50
5328.23 49.07 96.29 3900.01 3978.61 3103.44 3154.29 3129. 80
5424.12 48.71 96.65 3963.06 4041.66 3174.91 3226.54 3202 .04
5518.74 49.22 97.66 4025.18 4103.78 3245.63 3297.91 3273 .41
5615.31 48.55 96.33 4088.68 4167.28 3317.69 3370.67 3346. 16
5710.48 48.46 95.99 4151.74 4230.34 3388.14 3441.95 3417 .42
5806.66 50.16 96.26 4214.44 4293.04 3460.21 3514.88 3490 .33
5902.52 54.11 97.19 4273.27 4351.87 3535.10 3590.54 3565 .99
-202.31
-210.73
-219.05
-227.07
-234.98
-242.87
-251.05
-257.51
-265.52
-273.66
-282.33
-290.00
-295.89
-301.49
-307.53
-313.19
-319.00
-325.49
-332.58
-339.84
-347.89
-356.31
-364.34
-372.53
-381.23
-390.22
-398.93
-406.84
-414.98
-423.87
-432.73
-440.38
-448.17
-457.04
1147.85
1220.78
1293.67
1367.10
1439.79
1512.51
1585.41
1642.21
1716.42
1788.53
1860.10
1933.75
2008.07
2081.70
2155.28
2228.25
2300.82
2372.48
2444.92
2517.22
2591.15
2664.78
2738.55
2811.86
2885.52
2958.33
3031.37
3103.25
3175.03
3245.85
3318.06
3388.93
3461.44
3536.58
0.58 5977957.22
0.36 5977949.61
0.50 5977942.11
0.19 5977934.90
0.31 5977927.81
0.22 5977920.72
0.24 5977913.36
0.86 5977907.52
0.46 5977900.35
1.13 5977893.01
1.05 5977885.13
1.99 5977878.28
0.99 5977873.23
0.76 5977868.44
0.57 5977863.22
0.46 5977858.38
0.70 5977853.38
0.48 5977847.68
0.46 5977841.40
2.14 5977834.94
bi54Ul b.7Z IV /V.34yr5b/bV W 14y.J7 /yV3/Z
584083.67 N 70.34984693 W 149.31734781
584155.54 N 70.34982403 W 149.31676507
584228.64 N 70.34980051 W 149.31617238
584301.82 N 70.34977672 W 149.31557901
584375.20 N 70.34975304 W 149.31498403
584448.66 N 70.34972983 W 149.31438839
584521.66
584594.68
584667.64
584741.15
584813.92
584886.72
584959.70
585016.56
585090.84
585163.03
585234.69
585308.42
585382.79
585456.47
585530.11
585603.13
585675.75
585747.47
585819.97
585892.35
N 70.34970716 W 149.31379648
N 70.34968411 W 149.31320443
N 70.34966137 W 149.31261276
N 70.34963940 W 149.31 ~8
N 70.34961778 W 149.31
N 70.34959617 W 149.31083632
N 70.34957379 W 149.31024455
N 70.34955609 W 149.30978351
N 70.34953418 W 149.30918112
N 70.34951190 W 149.30859579
N 70.34948816 W 149.30801483
N 70.34946715 W 149.30741694
N 70.34945102 W 149.30681364
N 70.34943565 W 149.30621597
N 70.34941910 W 149.30561869
N 70.34940358 W 149.30502635
N 70.34938766 W 149.30443729
N 70.34936985 W 149.30385562
N 70.34935042 W 149.30326763
N 70.34933052 W 149.30268069
0.74 5977827.72 585966.35 N 70.34930847 W 149.30208062
0.20 5977820.12
0.32 5977812.92
0.74 5977805.54
0.10 5977797.66
0.50 5977789.48
1.57 5977781.58
0.14 5977774.48
0.47 5977767.14
0.97 5977759.04
1.25 5977750.98
0.28 5977744.12
1.78 5977737.14
4.19 5977729.10
586040.07
586113.91
586187.30
586261.05
586333.95
586407.07
586479.03
586550:89
586621.80
586694.09
586765.04
586837.62
586912.85
N 70.34928539 W 149.301
N 70.34926339 W 149.30 4
N 70.34924093 W 149.30028909
N 70.34921709 W 149.29969117
N 70.34919246 W 149.29910017
N 70.34916857 W 149.29850731
N 70.34914690 W 149.29792385
N 70.34912458 W 149.29734115
N 70.34910020 W 149.29676634
N 70.34907590 W 149.29618022
N 70.34905492 W 149.29560495
N 70.34903356 W 149.29501639
N 70.34900922 W 149.29440649
SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) S-U\L-204\L-2O4L3\L-2O4L3 Generated 10/2/2006 12:57 PM Page 2 of 7
Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
n de de n n n n n n n de 100 ft nUS nUS
Ile-In Survey SyytS. U4 5/.lU yti.yti 4:i'L/.LC 44U5.ifL :ibl:i.ltf :ibb`J.:ib :ib44.23U -4bb./5 :ib14./y ;i.14 Oy///LV .L/ 5t5byyl. lb IV /V.:54t5yt5LtlV W 14y.Ly:S//1bU
MWD+IFR+MS 6064. 00 59.36 96.16 4361.95 4440.55 3668.65 3725.42 3700.86 -473.15 3670.49 3.58 5977714 .49 587046. 92 N 70.34896504 W 149.29331950
---` 6076. 00 61.26 95.89 4367.89 4446.49 3678.95 3735.85 3711.29 -474.24 3680.86 15.95 5977713 .51 587057. 30 N 70.34896204 W 149.29323535
6115. 58 61.69 98.09 4386.79 4465.39 3713.39 3770.62 3746.06 -478.47 3715.37 5.00 5977709 .66 587091. 86 N 70.34895043 W 149.29295521
6147. 81 66.23 99.78 4400.94 4479.54 3742.19 3799.57 3774.99 -482.98 3743.97 14.85 5977705 .48 587120. 50 N 70.34893808 W 149.29272310
6178. 74 70.98 101.34 4412.22 4490.82 3770.89 3828.36 3803.74 -488.26 3772.27 16.06 5977700 .51 587148. 85 N 70.34892362 W 149.29249339
6210. 79 74.82 104.27 4421.64 4500.24 3801.50 3858.99 3834.22 -495.06 3802.13 14.83 5977694 .05 587178. 79 N 70.34890501 W 149.29225104
6241. 70 79.53 106.53 4428.51 4507.11 3831.62 3889.12 3864.06 -503.06 3831.18 16.82 5977686 .37 587207. 91 N 70.34888310 W 149.29201530
6273. 94 84.70 108.69 4432.93 4511.53 3863.51 3921.04 3895.49 -512.72 3861.60 17.35 5977677 .05 587238. 44 N 70.34885666 W 149.29176837
6305. 89 90.09 110.68 4434.38 4512.98 3895.30 3952.95 3926.69 -523.47 3891.64 17.98 5977666 .63 587268. 60 N 70.34882726 W 149.29152458
6336. 22 95.68 113.67 4432.85 4511.45 3925.34 3983.23 3956.01 -534.90 3919.68 20.89 5977655 .52 587296. 76 N 70.34879600 W 149.2914
6367. 17 99.27 112.81 4428.83 4507.43 3955.69 4013.91 3985.58 -547.00 3947.87 11.92 5977643 .73 587325. 08 N 70.34876289 W 149.291DC1S25
6397. 86 99.59 108.98 4423.80 4502.40 3985.80 4044.18 4015.08 -557.80 3976.15 12.35 5977633 .25 587353. 47 N 70.34873335 W 149.29083875
6429. 50 97.31 104.47 4419.15 4497.75 4017.07 4075.48 4046.01 -566.80 4006.11 15.83 5977624 .59 587383. 53 N 70.34870872 W 149.29059557
6458. 84 96.21 101.22 4415.69 4494.29 4046.18 4104.61 4075.04 -573.28 4034.51 11.62 5977618 .43 587412. 00 N 70.34869099 W 149.29036504
6489. 93 97.35 97.51 4412.02 4490.62 4076.90 4135.49 4105.90 -578.30 4064.97 12.40 5977613 .74 587442. 51 N 70.34867722 W 149.29011785
6520. 39 96.20 93.14 4408.42 4487.02 4106.72 4165.73 4136.10 -581.10 4095.08 14.74 5977611 .27 587472. 64 N 70.34866951 W 149.28987346
6550. 42 94.97 92.81 4405.50 4484.10 4135.96 4195.62 4165.87 -582.66 4124.92 4.24 5977610 .05 587502. 50 N 70.34866523 W 149.28963120
6581. 83 95.03 93.44 4402.76 4481.36 4166.59 4226.91 4197.05 -584.36 4156.17 2.01 5977608 .70 587533. 76 N 70.34866052 W 149.28937759
6611. 97 94.47 98.08 4400.27 4478.87 4196.24 4256.95 4227.05 -587.38 4186.04 15.45 5977606 .01 587563. 67 N 70.34865224 W 149.28913509
6642. 82 94.41 99.96 4397.88 4476.48 4226.83 4287.70 4257.80 -592.20 4216.42 6.08 5977601 .53 587594. 09 N 70.34863902 W 149.28888854
6673. 85 92.49 102.21 4396.01 4474.61 4257.73 4318.68 4288.73 -598.15 4246.81 9.52 5977595 .92 587624. 54 N 70.34862271 W 149.28864187
6704. 50 91.90 106.87 4394.84 4473.44 4288.35 4349.30 4319.15 -605.84 4276.45 15.31 5977588 .56 587654. 26 N 70.34860166 W 149.28840132
6735. 41 92.06 112.17 4393.77 4472.37 4319.13 4380.19 4349.42 -616.16 4305.56 17.14 5977578 .57 587683. 48 N 70.34857343 W 149.28816511
6766. 31 89.63 114.47 4393.31 4471.91 4349.69 4411.09 4379.24 -628.39 4333.93 10.83 5977566 .65 587711. 98 N 70.34853997 W 149.28793490
6796. 85 88.53 117.49 4393.80 4472.40 4379.66 4441.62 4408.34 -641.76 4361.37 10.52 5977553 .59 587739. 57 N 70.34850339 W 149.28771217
6828. 47 88.34 117.27 4394.67 4473.27 4410.52 4473.23 4438.23 -656.30 4389.44 0.92 5977539 .37 587767. 80 N 70.34846363 W 149.28748441
6858. 57 88.84 117.26 4395.41 4474.01 4439.91 4503.32 4466.73 -670.08 4416.19 1.66 5977525 .88 587794. 69 N 70.34842593 W 149.2872 736
6888. 94 89.63 113.18 4395.81 4474.41 4469.78 4533.69 4495.84 -683.02 4443.65 13.68 5977513 .25 587822. 30 N 70.34839055 W 149.28
6919. 85 87.75 110.77 4396.52 4475.12 4500.45 4564.59 4525.92 -694.58 4472.31 9.89 5977502 .01 587851. 08 N 70.34835891 W 149.28 4
6950. 52 90.01 108.76 4397.12 4475.72 4531.00 4595.25 4556.03 -704.95 4501.16 9.86 5977491 .96 587880. 04 N 70.34833054 W 149.28657778
6981. 18 89.56 104.12 4397.23 4475.83 4561.64 4625.91 4586.42 -713.62 4530.56 15.20 5977483 .62 587909. 53 N 70.34830680 W 149.28633919
7011. 99 86.94 101.77 4398.17 4476.77 4592.41 4656.71 4617.13 -720.52 4560.57 11.42 5977477 .05 587939. 61 N 70.34828790 W 149.28609564
7042. 90 86.32 102.40 4399.99 4478.59 4623.23 4687.56 4647.95 -726.98 4590.74 2.86 5977470 .93 587969. 85 N 70.34827020 W 149.28585076
7075 .07 85.81 103.97 4402.20 4480.80 4655.31 4719.66 4679.95 -734.30 4621.99 5.12 5977463 .96 588001. 17 N 70.34825015 W 149.28559717
7106 .69 87.90 106.91 4403.93 4482.53 4686.87 4751.23 4711.32 -742.71 4652.41 11.40 5977455 .89 588031. 69 N 70.34822714 W 149.28535022
7138 .41 88.18 108.03 4405.02 4483.62 4718.54 4782.93 4742.69 -752.22 4682.65 3.64 5977446 .72 588062. 03 N 70.34820109 W 149.28510482
7170 .27 87.13 108.27 4406.32 4484.92 4750.32 4814.76 4774.13 -762.14 4712.90 3.38 5977437 .14 588092. 39 N 70.34817395 W 149.28485934
7202 .67 87.97 109.09 4407.71 4486.31 4782.62 4847.13 4806.06 -772.51 4743.57 3.62 5977427 .11 588123. 16 N 70.34814557 W 149.28461048
7234 .08 87.69 107.81 4408.90 4487.50 4813.95 4878.52 4837.04 -782.44 4773.34 4.17 5977417 .51 588153. 04 N 70.34811838 W 149.28436886
7265 .93 87.18 108.48 4410.32 4488.92 4845.72 4910.34 4868.49 -792.35 4803.58 2.64 5977407 .94 588183. 38 N 70.34809126 W 149.28412349
SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204L3\L-204L3 Generated 10/2/2006 12:57 PM Page 3 of 7
Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
n de de n n ft n n n n de oo n ttus nus
7298. 03 88.06 109.15 4411.66 4490.26 4877.72 4942.41 4900.13 -802. 69 4833.93 3.44 5977397.94 588213.85 N 70.34806295 W 149.28387713
7330. 18 87.94 110.82 4412.78 4491.38 4909.72 4974.54 4931.72 -813. 67 4864.13 5.20 5977387.29 588244.16 N 70.34803290 W 149.28363209
7361. 30 88.53 110.90 4413.74 4492.34 4940.66 5005.64 4962.21 -824. 75 4893.19 1.91 5977376.54 588273.35 N 70.34800259 W 149.28339622
7392. 79 86.54 110.79 4415.09 4493.69 4971.95 5037.10 4993.07 -835. 95 4922.59 6.33 5977365.68 588302.87 N 70.34797195 W 149.28315764
7425. 60 82.95 109.63 4418.10 4496.70 5004.47 5069.77 5025.18 -847. 23 4953.25 11.49 5977354.73 588333.64 N 70.34794106 W 149.28290888
7457. 14 82.24 111.29 4422.16 4500.76 5035.60 5101.05 5055.91 -858. 16 4982.55 5.68 5977344.13 588363.06 N 70.34791115 W 149.28267108
7489. 57 81.64 110.27 4426.71 4505.31 5067.54 5133.16 5087.44 -869. 56 5012.57 3.62 5977333.07 588393.20 N 70.34787997 W 149.28242747
7521. 58 82.53 111.41 4431.12 4509.72 5099.08 5164.86 5118.56 -880. 83 5042.20 4.49 5977322.13 588422.96 N 70.34784910 W 149.28218703
7553. 29 82.28 111.38 4435.31 4513.91 5130.31 5196.29 5149.37 -892. 30 5071.47 0.79 5977310.99 588452.34 N 70.34781772 W 149.28194954
7586. 09 83.92 114.93 4439.25 4517.85 5162.53 5228.85 5181.07 -905. 10 5101.40 11.85 5977298.52 588482.41 N 70.34778269 W 149.28170665
7617. 16 88.33 117.85 4441.35 4519.95 5192.90 5259.85 5210.82 -918. 88 5129.16 17.01 5977285.05 588510.32 N 70.34774500 W 149.28
7649. 20 90.17 118.36 4441.77 4520.37 5224.09 5291.88 5241.30 -933. 97 5157.42 5.96 5977270.28 588538.74 N 70.34770372 W 149.28 4
7680. 21 90.01 117.77 4441.72 4520.32 5254.28 5322.89 5270.84 -948. 56 5184.78 1.97 5977256.00 588566.26 N 70.34766381 W 149.28103011
7711. 82 89.97 118.79 4441.72 4520.32 5285.03 5354.50 5300.92 -963. 54 5212.62 3.23 5977241.33 588594.26 N 70.34762285 W 149.28080425
7743. 28 91.05 119.65 4441.44 4520.04 5315.52 5385.96 5330.72 -978. 89 5240.07 4.39 5977226.28 588621.88 N 70.34758084 W 149.28058149
7775. 36 91.07 120.38 4440.85 4519.45 5346.48 5418.03 5360.98 -994. 94 5267.85 2.28 5977210.55 588649.83 N 70.34753696 W 149.28035615
7806. 94 90.36 119.13 4440.46 4519.06 5377.00 5449.61 5390.83 -1010. 61 5295.26 4.55 5977195.19 588677.42 N 70.34749409 W 149.28013373
7838. 93 89.84 120.23 4440.40 4519.00 5407.94 5481.60 5421.11 -1026. 45 5323.05 3.80 5977179.66 588705.38 N 70.34745077 W 149.27990823
7870. 68 89.19 117.21 4440.67 4519.27 5438.76 5513.35 5451.35 -1041. 70 5350.89 9.73 5977164.72 588733.39 N 70.34740904 W 149.27968235
7902. 94 88.31 112.93 4441.37 4519.97 5470.50 5545.60 5482.63 -1055. 37 5380.10 13.54 5977151.38 588762.74 N 70.34737166 W 149.27944537
7934. 68 87.75 114.04 4442.46 4521.06 5501.87 5577.32 5513.62 -1068. 01 5409.19 3.92 5977139.07 588791.97 N 70.34733707 W 149.27920930
7966. 45 87.45 114.00 4443.79 4522.39 5533.21 5609.07 5544.57 -1080. 93 5438.18 0.95 5977126.47 588821.10 N 70.34730171 W 149.27897405
7998. 18 86.64 112.63 4445.43 4524.03 5564.56 5640.75 5575.56 -1093. 47 5467.28 5.01 5977114.25 588850.34 N 70.34726739 W 149.27873793
8029. 62 87.87 111.38 4446.94 4525.54 5595.72 5672.16 5606.42 -1105. 23 5496.40 5.57 5977102.81 588879.58 N 70.34723519 W 149.27850168
8061. 64 87.75 111.08 4448.16 4526.76 5627.52 5704.15 5637.95 -1116. 82 5526.22 1.01 5977091.56 588909.53 N 70.34720348 W 149.27825967
8093. 05 87.66 110.78 4449.42 4528.02 5658.73 5735.54 5668.90 -1128. 03 5555.54 1.00 5977080.68 588938.96 N 70.34717279 W 149.27802181
8124. 77 89.05 111.71 4450.33 4528.93 5690.25 5767.24 5700.15 -1139. 52 5585.09 5.27 5977069.52 588968.63 N 70.34714134 W 149.27778202
8156 .94 89.18 110.09 4450.83 4529.43 5722.24 5799.41 5731.89 -1151. 00 5615.14 5.05 5977058.38 588998.81 N 70.34710993 W 149.27753819
8188 .60 88.69 108.57 4451.41 4530.01 5753.79 5831.06 5763.26 -1161. 47 5645.01 5.04 5977048.24 589028.79 N 70.34708125 W 149.27
8219 .96 88.73 109.06 4452.12 4530.72 5785.07 5862.42 5794.36 -1171. 59 5674.68 1.57 5977038.46 589058.57 N 70.34705356 W 149.27 1
8252 .07 88.92 110.76 4452.78 4531.38 5817.05 5894.52 5826.14 -1182. 52 5704.87 5.33 5977027.86 589088.87 N 70.34702363 W 149.27681009
8283 .84 88.76 111.00 4453.42 4532.02 5848.64 5926.28 5857.49 -1193. 84 5734.54 0.91 5977016.87 589118.67 N 70.34699265 W 149.27656928
8314 .86 90.18 109.33 4453.71 4532.31 5879.53 5957.30 5888.18 -1204. 53 5763.66 7.07 5977006.51 589147.90 N 70.34696337 W 149.27633302
8347 .51 88.19 106.13 4454.17 4532.77 5912.13 5989.95 5920.65 -1214. 47 5794.75 11.54 5976996.91 589179.10 N 70.34693615 W 149.27608074
8379 .47 87.68 104.26 4455.32 4533.92 5944.07 6021.88 5952.53 -1222. 84 5825.57 6.06 5976988.89 589210.01 N 70.34691322 W 149.27583063
8411 .11 90.93 103.19 4455.71 4534.31 5975.70 6053.52 5984.15 -1230 .35 5856.30 10.81 5976981.72 589240.81 N 70.34689265 W 149.27558125
8443 .26 90.61 101.32 4455.28 4533.88 6007.81 6085.67 6016.29 -1237. 17 5887.71 5.90 5976975.25 589272.30 N 70.34687394 W 149.27532634
8474 .77 90.04 101.27 4455.10 4533.70 6039.25 6117.17 6047.80 -1243. 34 5918.61 1.82 5976969.42 589303.26 N 70.34685702 W 149.27507558
8506 .53 89.52 101.48 4455.22 4533.82 6070.95 6148.93 6079.56 -1249. 61 5949.75 1.77 5976963.51 589334.46 N 70.34683984 W 149.27482290
8538 .58 88.95 101.85 4455.65 4534.25 6102.95 6180.98 6111.60 -1256. 09 5981.13 2.12 5976957.38 589365.91 N 70.34682207 W 149.27456821
SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204L3\L-204L3 Generated 10/2/200612:57 PM Page 4 of 7
Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft ft ft n ft ft de 00 ft ftUS ftUS
t35/U .L1 tfti.24 1UU.// 4456.42 4535.02 6134.52 (1212.61 Ei143.23 -1262 .L9 (iU12.15 4.Uti 59/6951.51 5t3939(i.99 N /U.346t3U5U5 W 149.27431651
8602 .24 89.15 101.52 4457.15 4535.75 6166.46 6244.62 6175.24 -1268 .48 6043. 56 3.68 5976945.68 589428. 47 N 70.34678808 W 149.27406163
8633 .81 90.81 100.90 4457.16 4535.76 6197.96 6276.19 6206.81 -1274 .61 6074. 52 5.61 5976939.89 589459. 49 N 70.34677124 W 149.27381033
8665 .64 90.51 99.81 4456.80 4535.40 6229.69 6308.02 6238.62 -1280 .33 6105. 83 3.55 5976934.52 589490. 86 N 70.34675555 W 149.27355625
8697 .53 90.83 100.47 4456.42 4535.02 6261.47 6339.91 6270.50 -1285 .95 6137. 22 2.30 5976929.26 589522. 31 N 70.34674014 W 149.27330151
8729 .30 90.78 98.78 4455.98 4534.58 6293.10 6371.67 6302.24 -1291.26 6168.54 5.32 5976924.30 589553.68 N 70.34672556 W 149.27304735
8761 .14 90.63 98.88 4455 .59 4534.19 6324.75 6403.51 6334.03 -1296.15 6200.00 0.57 5976919.76 589585.19 N 70.34671214 W 149.27279204
8793 .01 91.16 100.15 4455 .09 4533.69 6356.48 6435.38 6365.87 -1301.41 6231.43 4.32 5976914.84 589616.67 N 70.34669768 W 149.27253700
8824 .97 91.44 102.62 4454 .36 4532.96 6388.37 6467.33 6397.82 -1307.72 6262.75 7.78 5976908.88 589648.06 N 70.34668038 W 149.27228283
8856 .71 91.09 104.69 4453 .66 4532.26 6420.09 6499.06 6429.54 -1315.21 6293.58 6.61 5976901.74 589678.97 N 70.34665984 W 149.27203262
8888. 39 92.01 106.28 4452 .80 4531.40 6451.76 6530.73 6461.14 -1323.67 6324.10 5.80 5976893.62 589709.58 N 70.34663667 W 149.2
8921.
25
91.74
105.67
4451
.73
4530.33
6484.59
6563.57
6493.90
-1332.70
6355.67
2.03
5976884.94
589741.25 7
N 70.34661191 W 149.27
8952. 35 91.19 106.03 4450 .93 4529.53 6515.68 6594.66 6524.91 -1341.20 6385.58 2.11 5976876.78 589771.24 N 70.34658864 W 149.27 9
8982 .39 90.25 105.65 4450 .56 4529.16 6545.71 6624.70 6554.87 -1349.39 6414.48 3.38 5976868.91 589800.23 N 70.34656618 W 149.27105161
9016. 73 88.72 105.57 4450 .87 4529.47 6580.05 6659.04 6589.14 -1358.63 6447.55 4.46 5976860.03 589833.40 N 70.34654085 W 149.27078325
9048. 72 88.61 106.56 4451 .61 4530.21 6612.02 6691.02 6621.04 -1367.48 6478.28 3.11 5976851.53 589864.22 N 70.34651661 W 149.27053388
9080. 10 88.20 105.98 4452 .48 4531.08 6643.38 6722.39 6652.31 -1376.27 6508.39 2.26 5976843.08 589894.43 N 70.34649253 W 149.27028955
9112. 56 87.58 106.52 4453 .68 4532.28 6675.81 6754.82 6684.66 -1385.35 6539.53 2.53 5976834.35 589925.66 N 70.34646765 W 149.27003685
9144. 28 86.95 104.95 4455 .19 4533.79 6707.49 6786.51 6716.28 -1393.94 6570.03 5.33 5976826.10 589956.25 N 70.34644411 W 149.26978940
9175. 92 87.62 105.75 4456 .69 4535.29 6739.09 6818.11 6747.83 -1402.31 6600.51 3.30 5976818:07 589986.82 N 70.34642118 W 149.26954210
9206. 91 88.03 107.10 4457 .87 4536.47 6770.05 6849.08 6778.70 -1411.06 6630.21 4.55 5976809.65 590016.61 N 70.34639719 W 149.26930108
9239. 37 87.79 106.20 4459 .05 4537.65 6802.47 6881.52 6811.03 -1420.36 6661.29 2.87 5976800.70 590047.79 N 70.34637172 W 149.26904890
9271. 62 85.30 105.54 4461 .00 4539.60 6834.65 6913.71 6843.15 -1429.16 6692.25 7.99 5976792.24 590078.84 N 70.34634760 W 149.26879767
9303. 59 86.88 105.11 4463 .18 4541.78 6866.55 6945.60 6874.99 -1437.59 6723.01 5.12 5976784.16 590109.69 N 70.34632449 W 149.26854807
9335. 20 87.31 106.25 4464 .78 4543.38 6898.11 6977.17 6906.50 -1446.12 6753.40 3.85 5976775.96 590140.18 N 70.34630111 W 149.26830144
9367. 80 86.99 105.51 4466 .40 4545.00 6930.67 7009.73 6938.99 -1455.03 6784.72 2.47 5976767.40 590171.59 N 70.34627670 W 149.26804733
9399. 07 86.14 106.22 4468 .27 4546.87 6961.88 7040.94 6970.13 -1463.56 6814.74 3.54 5976759.21 590201.70 N 70.34625331 W 149.26780371
9430. 61 88.09 107.53 4469 .86 4548.46 6993.36 7072.44 7001.52 -1472.71 6844.89 7.45 5976750.40 590231.94 N 70.34622826 W 149.26755914
9462. 52 88.10 111.90 4470 .92 4549.52 7025.13 7104.33 7033.13 -1483.46 6874.90 13.69 5976739.98 590262.07 N 70.34619880 W 149.26731561
9494. 49 87.96 114.93 4472 .02 4550.62 7056.73 7136.29 7064.47 -1496.16 6904.22 9.48 5976727.61 590291.53 N 70.34616404 W 149.26
9526. 45 87.71 113.96 4473 .23 4551.83 7088.22 7168.22 7095.69 -1509.38 6933.29 3.13 5976714.72 590320.74 N 70.34612786 W 149.26684188
9558. 94 87.81 115.11 4474 .50 4553.10 7120.23 7200.69 7127.41 -1522.86 6962.83 3.55 5976701.57 590350.42 N 70.34609096 W 149.26660228
9590. 86 88.32 117.28 4475 .58 4554.18 7151.51 7232.59 7158.39 -1536.94 6991.45 6.98 5976687.81 590379.20 N 70.34605242 W 149.26637007
9622 .73 86.94 119.27 4476 .89 4555.49 7182.49 7264.43 7189.02 -1552.02 7019.49 7.59 5976673.04 590407.40 N 70.34601114 W 149.26614260
9654 .42 86.75 119.10 4478 .64 4557.24 7213.15 7296.07 7219.33 -1567.45 7047.12 0.80 5976657.92 590435.19 N 70.34596892 W 149.26591851
9686 .28 86.62 119.52 4480 .48 4559.08 7243.96 7327.88 7249.79 -1583.02 7074.85 1.38 5976642.66 590463.10 N 70.34592631 W 149.26569352
9718 .50 86.26 119.15 4482 .48 4561.08 7275.11 7360.04 7280.59 -1598.77 7102.88 1.60 5976627.22 590491.30 N 70.34588320 W 149.26546612
9749 .23 85.84 119.17 4484 .60 4563.20 7304.82 7390.70 7310.00 -1613.71 7129.66 1.37 5976612.58 590518.24 N 70.34584232 W 149.26524895
9781 .28 85.79 118.57 4486 .94 4565.54 7335.84 7422.66 7340.71 -1629.15 7157.65 1.87 5976597.47 590546.39 N 70.34580008 W 149.26502188
9813 .38 84.72 117.29 4489 .59 4568.19 7367.01 7454.65 7371.60 -1644.13 7185.91 5.19 5976582.80 590574.82 N 70.34575908 W 149.26479262
9845 .01 85.55 118.15 4492 .27 4570.87 7397.74 7486.16 7402.07 -1658.79 7213.81 3.77 5976568.45 590602.88 N 70.34571896 W 149.26456631
SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204L3\L-204L3 Generated 10/2/2006 12:57 PM Page 5 of 7
Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de n n tt ft ft tt ft de 100 tt ftUS ftUS
y?i//.LL 2f6.U4 11/.// 44`J4.b4 4b/3.Z4 /4Y`J.V3 /blt5.'Ly /433.1U -lb/3. Cb /Y4Z.ltf l.`JZ 5y/b553 ./1 SyUb:fl.47 IV /V.:54b1)///4 W 14y.YU43Jb14
9909.08 85.77 119.35 4496.91 4575.51 7459.91 7550.07 7463.72 -1689. 04 7270.09 5.02 5976538 .83 590659.49 N 70.34563616 W 149.26410973
9940.67 86.25 118.56 4499.11 4577.71- 7490.48 7581.58 7494.04 -1704. 30 7297.67 2.92 5976523 .88 590687.23 N 70.34559441 W 149.26388606
9972.33 86.61 120.52 4501.08 4579.68 7521.05 7613.18 7524.35 -1719. 88 7325.16 6.28 5976508 .61 590714.89 N 70.34555177 W 149.26366308
10004.23 84.51 117.56 4503.55 4582.15 7551.89 7644.98 7554.95 -1735. 31 7352.96 11.35 5976493 .49 590742.86 N 70.34550953 W 149.26343757
10036.26 85.32 119.67 4506.39 4584.99 7582.88 7676.88 7585.72 -1750. 59 7380.96 7.03 5976478 .52 590771.03 N 70.34546771 W 149.26321040
10068.67 89.11 119.82 4507.96 4586.56 7614.17 7709.25 7616.78 -1766. 65 7409.06 11.70 5976462 .78 590799.30 N 70.34542377 W 149.26298246
10100.46 89.14 119.92 4508.45 4587.05 7644.88 7741.04 7647.27 -1782. 48 7436.63 0.33 5976447 .26 590827.04 N 70.34538045 W 149.26275888
10131.77 88.67 121.00 4509.05 4587.65 7675.04 7772.34 7677.21 -1798. 35 7463.61 3.76 5976431 .69 590854.19 N 70.34533702 W 149.26254002
10163.82 88.15 120.50 4509.94 4588.54 7705.86 7804.38 7707.82 -1814. 73 7491.14 2.25 5976415 .62 590881.90 N 70.34529219 W 149.26231669
10195.95 87.64 119.99 4511.12 4589.72 7736.82 7836.49 7738.59 -1830. 90 7518.88 2.24 5976399 .76 590909.82 N 70.34524794 W 149.26
0
10227.33 88.25 118.46 4512.24 4590.84 7767.21 7867.85 7768.81 -1846. 21 7546.25 5.25 5976384 .75 590937.35 2
N 70.34520603 W 149.26
10259.59 87.81 118.93 4513.35 4591.95 7798.52 7900.09 7799.96 -1861. 69 7574.53 2.00 5976369 .59 590965.80 N 70.34516367 W 149.26 2
10291.31 87.91 117.83 4514.54 4593.14 7829.35 7931.78 7830.64 -1876. 76 7602.42 3.48 5976354 .84 590993.85 N 70.34512243 W 149.26141411
10322.92 87.85 118.47 4515.71 4594.31 7860.09 7963.37 7861.26 -1891. 66 7630.27 2.03 5976340 .25 591021.86 N 70.34508164 W 149.26118819
10355.24 87.16 117.31 4517.11 4595.71 7891.56 7995.66 7892.60 -1906. 77 7658.81 4.17 5976325 .46 591050.57 N 70.34504030 W 149.26095671
10387.05 88.35 116.52 4518.36 4596.96 7922.65 8027.45 7923.58 -1921. 15 7687.15 4.49 5976311 .39 591079.06 N 70.34500091 W 149.26072681
10418.78 88.19 116.22 4519.32 4597.92 7953.73 8059.16 7954.56 -1935. 24 7715.56 1.07 5976297 .62 591107.63 N 70.34496235 W 149.26049631
10451.08 89.25 115.94 4520.04 4598.64 7985.41 8091.45 7986.15 -1949. 44 7744.57 3.39 5976283. 75 591136.79 N 70.34492348 W 149.26026104
10482.84 88.79 116.88 4520.58 4599.18 8016.53 8123.21 8017.18 -1963. 56 7773.01 3.29 5976269. 95 591165.38 N 70.34488482 W 149.26003035
10514.96 88.02 115.89 4521.48 4600.08 8047.99 8155.32 8048.57 -1977. 83 7801.77 3.90 5976256. 00 591194.30 N 70.34484576 W 149.25979704
10546.58 88.88 114.45 4522.33 4600.93 8079.10 8186.93 8079.60 -1991. 27 7830.38 5.30 5976242. 88 591223.05 N 70.34480895 W 149.25956499
10578.25 88.90 113.98 4522.94 4601.54 8110.34 8218.59 8110.79 -2004. 26 7859.26 1.49 5976230. 21 591252.07 N 70.34477339 W 149.25933074
10610.32 88.39 112.93 4523.70 4602.30 8142.05 8250.65 8142.45 -2017. 02 7888.67 3.64 5976217. 78 591281.62 N 70.34473844 W 149.25909215
10641.49 88.24 114.20 4524.62 4603.22 8172.85 8281.81 8173.20 -2029. 48 7917.22 4.10 5976205. 65 591310.31 N 70.34470433 W 149.25886049
10674.25 88.80 115.54 4525.47 4604.07 8205.10 8314.56 8205.40 -2043. 25 7946.94 4.43 5976192 .21 591340.17 N 70.34466662 W 149.25861948
10705.65 88.12 118.89 4526.31 4604.91 8235.77 8345.94 8236.01 -2057. 60 7974.85 10.88 5976178 .17 591368.23 N 70.34462733 W 149.25839310
10737.80 86.81 119.50 4527.73 4606.33 8266.89 8378.06 8267.08 -2073. 27 8002.88 4.49 5976162 .81 591396.44 N 70.34458445 W 149.25816569
10770.11 86.38 119.21 4529.65 4608.25 8298.12 8410.32 8298.26 -2089. 08 8030.99 1.60 5976147 .32 591424.72 N 70.34454117 W 149.25793768
10801.76 87.76 122.25 4531.27 4609.87 8328.53 8441.92 8328.62 -2105. 23 8058.16 10.54 5976131 .47 591452.06 N 70.34449697 W 149.256
10833.91 91.24 121.38 4531.55 4610.15 8359.29 8474.07 8359.34 -2122. 18 8085.48 11.16 5976114 .83 591479.56 N 70.34445060 W 149.25749583
10865.85 91.37 120.45 4530.82 4609.42 8389.98 8506.00 8390.00 -2138. 58 8112.87 2.94 5976098 .74 591507.14 N 70.34440570 W 149.25727365
10897.45 90.88 119.58 4530.20 4608.80 8420.48 8537.59 8420.49 -2154. 38 8140.23 3.16 5976083 .24 591534.66 N 70.34436244 W 149.25705177
10929.25 90.71 119.97 4529.76 4608.36 8451.21 8569.39 8451.21 -2170. 17 8167.83 1.34 5976067 .76 591562.43 N 70.34431923 W 149.25682793
10960.75 90.26 118.63 4529.49 4608.09 8481.72 8600.89 8481.72 -2185. 59 8195.29 4.49 5976052 .65 591590.07 N 70.34427703 W 149.25660515
10993.07 91.75 119.14 4528.93 4607.53 8513.08 8633.20 8513.09 -2201. 20 8223.59 4.87 5976037 .36 591618.53 N 70.34423430 W 149.25637566
11025.40 91.81 117.25 4527.92 4606.52 8544.53 8665.52 8544.55 -2216. 47 8252.07 5.85 5976022 .41 591647.18 N 70.34419251 W 149.25614468
11056.58 91.49 116.01 4527.02 4605.62 8575.05 8696.68 8575.08 -2230. 44 8279.93 4.11 5976008 .75 591675.19 N 70.34415426 W 149.25591871
11088.92 93.09 116.85 4525.73 4604.33 8606.71 8729.00 8606.77 -2244. 82 8308.86 5.59 5975994 .70 591704.28 N 70.34411488 W 149.25568401
11120.47 92.90 115.55 4524.08 4602.68 8637.60 8760.50 8637.69 -2258. 73 8337.13 4.16 5975981 .10 591732.70 N 70.34407680 W 149.25545472
11152.26 92.52 115.22 4522.58 4601.18 8668.83 8792.26 8668.94 -2272. 34 8365.82 1.58 5975967 .81 591761.53 N 70.34403952 W 149.25522203
SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204L3\L-204L3 Generated 10/2/2006 12:57 PM Page 6 of 7
Comments Measured Inclination Azimuth SulS•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude .
Depth Section Departure
tt de de tt tt n n tt tt tt de ooft ttUS ftUS
11125:1.415 `J~'L. U25 115.y4 4bLl.JJ 45`J`J.y3 25b`Jy.4y LS25LJ.4b Cbyy.bL -CCCJ.t51 iSJyJ.yb L./V 5y/b`Jb4.bb
11215.47 90. 60 114.65 4520.58 4599.18 8730.94 8855.43 8731.11 -2299.47 8422.87 6.14 5975941. 32
11247.98 90. 52 110.37 4520.26 4598.86 8763.16 8887.94 8763.36 -2311.92 8452.90 13.17 5975929. 21
11279.78 91. 40 107.38 4519.73 4598.33 8794.87 8919.74 8795.09 -2322.20 8482.98 9.80 5975919. 26
11312.42 91. 08 107.45 4519.02 4597.62 8827.47 8952.37 8827.70 -2331.97 8514.11 1.00 5975909. 84
11344.52 90. 31 104.92 4518.63 4597.23 8859.56 8984.47 8859.79 -2340.91 8544.94 8.24 5975901. 24
11375.75 87. 94 104.58 4519.11 4597.71 8890.78 9015.69 8891.01 -2348.86 8575.13 7.67 5975893. 63
11407.98 87. 24 103.89 4520.47 4599.07 8922.98 9047.89 8923.21 -2356.78 8606.34 3.05 5975886. 06
11439.61 87. 06 104.99 4522.04 4600.64 8954.57 9079.48 8954.79 -2364.66 8636.94 3.52 5975878. 52
11471.40 86. 71 104.84 4523.77 4602.37 8986.32 9111.23 8986.53 -2372.83 8667.61 1.20 5975870. 69
11503.69 86. 41 104.70 4525.70 4604.30 9018.55 9143.46 9018.76 -2381.05 8698.78 1.02 5975862. 83
11535.16 85. 93 103.92 4527.81 4606.41 9049.94 9174.86 9050.16 -2388.81 8729.20 2.91 5975855. 40
11567.34 87. 38 105.06 4529.68 4608.28 9082.07 9206.98 9082.28 -2396.85 8760.30 5.73 5975847. 71
11599.24 87. 75 106.49 4531.04 4609.64 9113.93 9238.85 9114.15 -2405.51 8790.97 4.63 5975839. 39
11631.34 87. 24 105.00 4532.44 4611.04 9146.00 9270.92 9146.22 -2414.21 8821.84 4.90 5975831. 03
11662.83 88. 69 107.31 4533.56 4612.16 9177.46 9302.39 9177.68 -2422.97 8852.06 8.66 5975822. 62
11694.90 88. 89 106.75 4534.24 4612.84 9209.50 9334.45 9209.73 -2432.36 8882.72 1.85 5975813. 57
11726.70 88. 86 106.25 4534.86 4613.46 9241.28 9366.25 9241.52 -2441.39 8913.21 1.57 5975804. 88
11758.28 88. 42 106.61 4535.61 4614.21 9272.84 9397.82 9273.08 -2450.32 8943.49 1.80 5975796. 29
11789.54 88. 09 106.70 4536.56 4615.16 9304.07 9429.06 9304.32 -2459.27 8973.42 1.09 5975787. 67
11822.02 87. 45 106.19 4537.83 4616.43 9336.51 9461.52 9336.77 -2468.46 9004.55 2.52 5975778. 83
11853.45 87. 09 106.87 4539.32 4617.92 9367.90 9492.91 9368.15 -2477.39 9034.65 2.45 5975770. 23
Last MWD+IFR+MS 11878.39 87. 04 105.30 4540.60 4619.20 9392.80 9517.82 9393.06 -2484.29 9058.58 6.29 5975763. 60
TD (Projected) 11925.00 87. 04 105.30 4543.01 4621.61 9439.34 9564.37 9439.61 -2496.58 9103.47 0.00 5975751. 82
Survey Type: Definitive Survey
NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees incl ination. )
MWD +IFR + MS - ( In-field referenced MWD with mull-station analysis and correction applied in post-processing.
Assumes a BHA sag correction is applied to enhan ce inclination accuracy. )
Legal Description: Northing (Y) [ftUS] Eastin g (X) [ftUS]
Surface : 2423 FS L 3544 FEL S34 T12N R11 E UM 5978146.73 583371.74
BHL : 5201 FS L 5006 FEL S1 T1 1 N R11 E UM 5975751.82 592501.57
b`JI/25`J.23L IV /U..144VULb4 VV 14`J.Lb4`J`J325U
591818.$8 N 70.34396522 W 149.25475928
591849.04 N 70.34393114 W 149.25451573
591879.23 N 70.34390295 W 149.25427170
591910.47 N 70.34387617 W 149.25401911
591941.39 N 70.34385163 W 149.25376905
591971.66 N 70.34382982 W 149.25352408
592002.96 N 70.34380809 W 149.25327085
592033.64 N 70.34378647 W 149.25302266
592064.40 N 70.34376406 W 149.25277381
592095.65 N 70.34374151 W 149.252 6
592126.16 N 70.34372021 W 149.25
592157.34 N 70.34369815 W 149.25 0
592188.10 N 70.34367439 W 149.25177299
592219.06 N 70.34365051 W 149.25152259
592249.38 N 70.34362650 W 149.25127739
592280.13 N 70.34360074 W 149.25102869
592310.71 N 70.34357598 W 149.25078139
592341.09 N 70.34355148 W 149.25053574
592371.12 N 70.34352692 W 149.25029290
592402.34 N 70.34350172 W 149.25004039
592432.54 N 70.34347722 W 149.24979623
592456.54 N 70.34345829 W 149.24960209
592501.57 N 70.34342458 W 149.24923785
SurveyEditor Ver SP 2.1 Bld( doc40x_100) S-U\L-204\L-204L3\L-204L3 Generated 10/2/2006 12:57 PM Page 7 of 7
TREE = FMC 41/8" 5M
WELLHEAD = FMC GEN L- 4
ACTtJA, R = LE L-2
KB. ELEV = 78.6'
BF. ELEV = 50.1' L-204 L2
KOP = 7
' L-204 L3
Max Angle= 95 6583
~tum MD = 6142 L-204 L4
Datum TVD = 4478' SS
20" CONDUCTOR ~~ 109'
10-3l4" CSG. 45.5 L-80, ID = 9.95" 3457'
PHOENIX DSCHRGE-PRESS SUB,10 = 3.948" ~~ 5758'
PHNIX MULTI-PRESS SENSOR, ID = 3.994" ~-{ 5790'
RA TAG 5881'
7-5/8" x 5.5" BKR L~ PACKER, ID = 4.95" 5878'
Seal Assembly from LEM#3 6035'
L4 BKR HUGHES HOOK HGR, ID = 5.63" 5825'
Minimum ID = 3.688" @ 5925',
6059' & 6165' - LEM's
RA TAG 6015'
7-518" x 5.5" BKR ZXP PACKER, ID = 4.82" 6003'
Seal Assembly from LEM#2 6022'
L3 BKR HUGHES HOOK HGR, ID = 5.62" 6059'
RA TAG ~-~ 6115'
7-518" x 5.5" BKR ZXP PACKER, ID = 4.82" 6108'
Seal Assembly from LEM#1 6127'
L2 BKR HUGHES HOOK HGR, ID = 5.62" 6165'
~S/S" x 5.5" BKR ZXP PKR w/10.74' TIEBACK 6229'
-518" x 5.5' BKR HMC HANGER, 10 = 4.81" 6250'
RA TAG 6380'
7-5/8" CSG. 29.7 L-80, ID = 6.875" 6670'
NOTES:
=RC~DRLG -DRAFT
2191' 4-1 /2" HES X NIP, 10 = 3.813"
GAS LET MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
4 3011 2491 50 KBG-2 DMY SBK 0 09/01/06
3 4590 3508 51 KBG-2 DMY SBK 0 09(01106
2 5538 4116 49 KBG-2 DMY SBK 0 09!01!06
1 5648 4189 49 KBG-2 DCK2 BEK 0 09!01/06
L-204
5769' 4.5" Baker CMD-BXSliding Sleeee, 3.812" ID
5812' 7.625" x 4.5" Premier Packer 3.87" ID
5839' 4.5" HES X nipple W/ RHGM Plug, ID 3.813"
5860' 4.5" HES Xnipple, ID 3.813"
5886' 4.5" Guide Shoe
5925- 5948' ~-{ Hookwail Hanger below window - 3.99" ID-L4 OA
5984'- 5974' H 4" x 6.4" Swell Packer 3.9" ID-L4-OA
646T- 6456' H 4" x 6.4" Swell Packer 3.9" ID-L40A
8443'- 6498' 1--14.5" L-80 12.6# BTC Slotted Liner 3.958" ID-L4-OA
8474'-8464' I-14" x 6.4" Swe11 Packer 3.9" ID-L4-0A
8944'- 8934' 4" x 6.4" Swell Packer 3.9" ID-L4-0A
1183T- 8968' 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID-L40A
11877' 4.5" 12.6# L-80 IBT-M shoe (10,574' PBTD}L4-OA
6076'- 6082' )---{ Hookwall Hanger below window - 3.99" ID - L3 Oba
6124'- 6114' I--14" x 6.4" Swell Packer 3.9" ID-L3-Oba
649T- 648T 1~4" x 6.4" Swelf Packer 3.9" ID-L3-0ba
9709'- 653T I--~ 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID L3-Oba
9904'- 9894' ~-j4" x 6.4" Swell Packer 3.9" ID-L3-Oba
11869'-1012T 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID L3-Oba
11,912' 4.5" 12.6# L-80 IBT-M shoe (11,912' PBTD}L3-OBa
6182.6188 i-bokwall Hanger below window - 3.99" ID-L2 -0Bb
6256266 4" x 6.4" Swell Packer 3.9" tD-L2-0Bb
6282-11889 4.5" L-80 12.6# BTC Slotted Liner 3.958" ID-L2-OBb
11891' 4.5" 12.6# L-80 IBT-M shoe (11889' PBTD}L2-0Bb
r
i L
4" x 6.4" Swell Packer 3.9" ID 7123'-7133' '
4.5" 12.6# L-80 BTC Slotted (3.958" ID) 7233'9411' ~ ~
4" x 6.4" Swell Packer 3.9" I 9431'441'
4" x 6.4" Swell Packer 3.9" I 9850'-9860'
4.5" 12.6# L~0 BTC Slotted (3.958" ID 9875-11923 , ,
4.5" 12.6# L-80 BTGIBT Slotted/Sdid Liner ~ ~
St1oe (11961' PBTD) - L1 - OBd 11965' \' '
U
7018'
7055'-7065'
7065'-7451'
7451'-11961'
t 1963'
Weatherford Flow Through Aluminum Billet (partially
milted while drilling L7) - MB 08c
4" x 6.4" Swell Packer 3.9" ID - MB OBc
4.5" 12.6# L-80 IBT solid (3.958" ID) - MB OBc
4.5" 12.6# L-80 BTC slotted (3.958" ID) - MB OBc
4.5" 12.6# L-80 BTC shoe (11961' PBTD) -MB-Obc
DATE REV BY COMIuB~fTS DATE REV BY COMMENTS
09/03/06 9ES ORIGINAL COMPLETION
09!04/06 JOMfPAG DRLG DRAFT CORRECTIONS
a~ - - - - - - - - - - - - -~
ORION UNiT
WELL: L-204, L1, L2, L3, L4
PERMiT No: 206-092 (093) (094) (095) (096)
API No: 50-029-2331400 (60) (61) (62) (63)
SEC 34, T12N, R11 E, 2423' NSL & 3544' WEl
BP 6cploration (Alaska)
d
~'
1
Q
SCHLUMBERGER
Survey report
Client ...................: BP Exploration (Alaska) Inc.
Field ..................... Orion
Well ...................... L-204L3
API number ...............: 50-029-23314-62
Engineer .................: St. Amour
Rig :...................... Nabors 9ES
STATE :.................... Alaska
----- Survey calculation methods-------------
Method for positions.....: Minimum curvature
Method for DLS...........: Mason & Taylor
----- Depth reference ----
Permanent datum..........:
Depth reference..........:
GL above permanent.......:
KB above permanent.......:
DF above permanent.......:
------------------
Mean Sea Level
Drillers Pipe Tally
49.75 ft
N/A (Topdrive)
78.60 ft
----- Vertical section origin----------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: -999.25 ft
Departure (+E/W-)........: -999.25 ft
Azimuth from Vsect Origin to target: 104.91 degrees
19-Aug-2006 07:36:50 Page 1 of 10
Spud date ................: 16-Jul-2006
Last survey date.........: 19-Aug-06
Total accepted surveys...: 251
MD of first survey........ 0.00 ft
MD of last survey........: 11925.00 ft
----- Geomagnetic data ----------------------
Magnetic model...........: BGGM version 2005
Magnetic date ............: 07-Aug-2006
Magnetic field strength..: 57579.80 GAMA
Magnetic dec (+E/W-).....: 24.15 degrees
Magnetic dip .............: 80.86 degrees
----- MWD survey Reference Criteria ---------
Reference G ............... 1002.68 meal
Reference H ............... 57580.00 GAMA
Reference Dip ............. 80.86 degrees
Tolerance of G...........: (+/-) 2.50 meal
Tolerance of H...........: (+/-)300.00 GAMA
Tolerance of Dip.........: (+/-) 0.45 degrees
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: 24.17 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: 24.17 degrees
(Total az corr = magnetic dec - grid cony)
Survey Correction Type ....
I=Sag Corrected Inclination
M=5chlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
•
SCHLiJMBERGER Survey Report 19-Aug-2006 07:36:50 Page 2 of 10
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None
2 100.00 0.85 12.39 100.00 100.00 -0.03 0.72 0.16 0.74 12.39 0.85 BP _GYD CT DMS
3 166.00 1.26 13.33 66.00 165.99 -0.07 1.91 0.43 1.96 12.74 0.62 BP _GYD CT DMS
4 261.00 1.00 28.99 95.00 260.97 0.10 3.65 1.07 3.80 16.40 0.42 BP _GYD CT DMS
5 351.00 1.31 131.89 90,00 350.96 1.21 3.65 2.22 4.27 31.31 2.02 BP _GYD CT DMS
6 443.00 4.58 153.98 92.00 442.82 4.55 -0.35 4.62 4.63 94.39 3.70 BP _GYD CT DMS •
7 533.00 6.02 158.29 90.00 532.44 9.72 -7.97 7.94 11.25 135.11 1.66 BP _GYD CT DMS
8 626.00 7.28 140.25 93.00 624.82 17.44 -17.03 13.51 21.74 141.57 2.61 BP _GYD CT DMS
9 720.00 8.24 132.06 94.00 717.96 28.29 -26.12 22.32 34.36 139.49 1.56 BP _GYD CT DMS
10 813.00 8.53 135.67 93.00 809.97 40.15 -35.52 32.09 47.87 137.91 0.65 BP _GYD CT DMS
11 875.00 9.83 127.28 62.00 871.17 48.99 -42.02 39.51 57.68 136.76 3.00 BP _GYD CT DMS
12 941.45 11.66 111.02 66.45 936.47 60.92 -47.86 50.30 69.43 133.58 5.30 BP _MWD+IFR+MS
13 1037.16 15.11 111.81 95.71 1029.57 82.93 -55.97 70.91 90.34 128.28 3.61 BP _MWD+IFR+MS
14 1132.97 19.34 108.37 95.81 1121.06 111.17 -65.61 97.58 117.59 123.92 4.54 BP _MWD+IFR+MS
15 1229.64 23.03 106.69 96.67 1211.18 146.06 -76.09 130.89 151.40 120.17 3.87 BP MWD+IFR+MS
16 1324.32 25.69 102.66 94.68 1297.43 185.09 -85.91 168.67 189.28 116.99 3.31 BP _MWD+IFR+MS
17 1420.06 30.67 99.73 95.74 1381.80 230.18 -94.59 213.01 233.07 113.94 5.40 BP _MWD+IFR+MS
18 1515.04 36.39 97.47 94.98 1460.95 282.28 -102.36 264.87 283.96 111.13 6.16 BP _MWD+IFR+MS
19 1610.55 42.03 95.77 95.51 1534.92 341.99 -109.26 324.82 342.70 108.59 6.01 BP _MWD+IFR+MS
20 1711.65 40.01 95.64 101.10 1611.20 407.49 -115.86 390.84 407.65 106.51 2.00 BP MWD+IFR+MS
21 1807.00 41.19 96.35 95.35 1683.59 468.79 -122.34 452.55 468.80 105.13 1.33 BP _MWD+IFR+MS •
22 1902.84 39.77 96.73 95.84 1756.49 530.34 -129.42 514.36 530.39 104.12 1.50 BP _MWD+IFR+MS
23 1998.47 41.97 96.35 95.63 1828.80 592.25 -136.55 576.53 592.48 103.32 2.32 BP _MWD+IFR+MS
24 2094.14 44.85 96.05 95.67 1898.29 657.23 -143.64 641.88 657.76 102.61 3.02 BP _MWD+IFR+MS
25 2189.87 47.22 96.54 95.73 1964.75 725.35 -151.20 710.36 726.28 102.02 2.50 BP _MWD+IFR+MS
26 2285.57 50.89 96.76 95.70 2027.45 796.87 -159.58 782.15 798.26 101.53 3.84 BP _MWD+IFR+MS
27 2381.11 49.73 96.68 95.54 2088.47 869.64 -168.18 855.16 871.54 101.13 1.22 BP _MWD+IFR+MS
28 2477.10 50.42 96.89 95.99 2150.07 942.52 -176.88 928.26 944.96 100.79 0.74 BP _MWD+IFR+MS
29 2572.36 51.15 96.59 95.26 2210.30 1015.57 -185.54 1001.55 1018.59 100.50 0.80 BP _MWD+IFR+MS
30 2668.18 49.72 96.60 95.82 2271.33 1088.66 -194.02 1074.93 1092.30 100.23 1.49 BP _MWD+IFR+MS
SCHLUMBERGER Survey Report 19-Aug-2006 07:36:50 Page 3 of 10
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
31 2764.00 50.25 96.37 95.82 2332.94 1161.25 -202.31 1147.85 1165.54 100.00 0.58 BP _MWD+IFR+MS
32 2859.46 50.30 96.81 95.46 2393.95 1233.90 -210.73 1220.78 1238.84 99.79 0.36 BP _MWD+IFR+MS
33 2954.76 50.37 96.20 95.30 2454.78 1306.47 -219.05 1293.67 1312.08 99.61 0.50 BP _MWD+IFR+MS
34 3050.79 50.20 96.28 96.03 2516.14 1379.50 -227.07 1367.10 1385.83 99.43 0.19 BP _MWD+IFR+MS
35 3146.15 49.93 96.13 95.36 2577.35 1451.78 -234.98 1439.79 1458.84 99.27 0.31 BP _MWD+IFR+MS
36 3241.60 50.12 96.26 95.45 2638.67 1524.08 -242.87 1512.51 1531.89 99.12 0.22 BP _MWD+IFR+MS •
37 3337.25 50.04 96.54 95.65 2700.05 1596.63 -251.05 1585.41 1605.17 99.00 0.24 BP _MWD+IFR+MS
38 3412.18 49.40 96.45 74.93 2748.50 1653.18 -257.51 1642.21 1662.28 98.91 0.86 BP _MWD+IFR+MS
39 3510.50 49.38 95.86 98.32 2812.50 1726.95 -265.52 1716.42 1736.83 98.79 0.46 BP _MWD+IFR+MS
40 3606.56 48.75 97.03 96.06 2875.44 1798.72 -273.66 1788.53 1809.34 98.70 1.13 BP MWD+IFR+MS
41 3701.74 49.73 96.79 95.18 2937.58 1870.11 -282.33 1860.09 1881.40 98.63 1.05 BP _MWD+IFR+MS
42 3797.81 51.14 95.12 96.07 2998.77 1943.26 -290.00 1933.75 1955.38 98.53 1.99 BP _MWD+IFR+MS
43 3893.70 50.93 93.93 95.89 3059.07 2016.60 -295.89 2008.07 2029.76 98.38 0.99 BP _MWD+IFR+MS
44 3989.02 50.62 94.78 95.32 3119.35 2089.19 -301.49 2081.70 2103.42 98.24 0.76 BP _MWD+IFR+MS
45 4084.90 50.09 94.60 95.88 3180.52 2161.84 -307.53 2155.28 2177.11 98.12 0.57 BP MWD+IFR+MS
46 4180.57 49.73 94.27 95.67 3242.13 2233.81 -313.19 2228.25 2250.15 98.00 0.46 BP _MWD+IFR+MS
47 4276.33 49.24 94.88 95.76 3304.34 2305.43 -319.00 2300.82 2322.83 97.89 0.70 BP _MWD+IFR+MS
48 4371.36 49.19 95.48 95.03 3366.42 2376.35 -325.49 2372.48 2394.70 97.81 0.48 BP _MWD+IFR+MS
49 4467.82 48.78 95.70 96.46 3429.72 2448.17 -332.58 2444.92 2467.43 97.75 0.46 BP _MWD+IFR+MS
50 4562.97 50.82 95.77 95.15 3491.14 2519.91 -339.84 2517.22 2540.06 97.69 2.14 BP MWD+IFR+MS
51 4658.78 51.00 96.65 95.81 3551.55 2593.42 -347.89 2591.15 2614.40 97.65 0.74 BP _MWD+IFR+MS .
52 4754.14 51.01 96.40 95.36 3611.55 2666.74 -356.31 2664.78 2688.50 97.62 0.20 BP _MWD+IFR+MS
53 4849.66 50.93 96.02 95.52 3671.71 2740.09 -364.34 2738.55 2762.68 97.58 0.32 BP _MWD+IFR+MS
54 4944.97 50.49 96.74 95.31 3732.06 2813.04 -372.53 2811.86 2836.43 97.55 0.74 BP _MWD+IFR+MS
55 5041.18 50.39 96.73 96.21 3793.33 2886.46 -381.23 2885.52 2910.59 97.53 0.10 BP MWD+IFR+MS
56 5136.35 50.47 97.34 95.17 3853.96 2959.13 -390.22 2958.33 2983.95 97.51 0.50 BP _MWD+IFR+MS
57 5232.61 49.20 96.26 96.26 3916.05 3031.95 -398.93 3031.37 3057.50 97.50 1.57 BP _MWD+IFR+MS
58 5328.23 49.07 96.29 95.62 3978.61 3103.44 -406.84 3103.24 3129.80 97.47 0.14 BP _MWD+IFR+MS
59 5424.12 48.71 96.65 95.89 4041.66 3174.91 -414.98 3175.03 3202.04 97.45 0.47 BP _MWD+IFR+MS
60 5518.74 49.22 97.66 94.62 4103.78 3245.63 -423.87 3245.85 3273.41 97.44 0.97 BP MWD+IFR+MS
SCHLiJMBERGER Survey Report 19 -Aug-2006 07:36:50 Page 4 of 10
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
61 5615.31 48.55 96.33 96.57 4167.28 3317.68 -432.73 3318.06 3346.16 97.43 1.25 BP_ MWD+IFR+MS
62 5710.48 48.46 95.99 95.17 4230.34 3388.14 -440.38 3388.93 3417.42 97.40 0.28 BP_ MWD+IFR+MS
63 5806.66 50.16 96.26 96.18 4293.04 3460.21 -448.17 3461.44 3490.33 97.38 1.78 BP_ MWD+IFR+MS
64 5902.52 54.11 97.19 95.86 4351.87 3535.10 -457.04 3536.58 3565.99 97.36 4.19 BP_ MWD+IFR+MS
65 5998.04 57.10 96.96 95.52 4405.82 3613.18 -466.75 3614.79 3644.80 97.36 3.14 BP_ MWD+IFR+MS
66 6064.00 59.36 96.16 65.96 4440.55 3668.65 -473.15 3670.49 3700.86 97.35 3.58 BP_ BLIND •
67 6076.00 61.26 95.89 12.00 4446.49 3678.95 -474.24 3680.86 3711.28 97.34 15.95 BP_ BLIND
68 6115.58 61.69 98.09 39.58 4465.39 3713.39 -478.47 3715.37 3746.06 97.34 5.00 BP_ INC+TREND
69 6147.81 66.23 99.78 32.23 4479.54 3742.19 -482.98 3743.97 3774.99 97.35 14.85 BP_ INC+TREND
70 6178.74 70.98 101.34 30.93 4490.82 3770.89 -488.26 3772.27 3803.74 97.38 16.06 BP_ MWD+IFR+MS
71 6210.79 74.82 104.27 32.05 4500.24 3801.50 -495.06 3802.13 3834.22 97.42 14.83 BP_ MWD+IFR+MS
72 6241.70 79.53 106.53 30.91 4507.10 3831.62 -503.06 3831.18 3864.06 97.48 16.82 BP_ MWD+IFR+MS
73 6273.94 84.70 108.69 32.24 4511.53 3863.51 -512.72 3861.60 3895.49 97.56 17.35 BP_ MWD+IFR+MS
74 6305.89 90.09 110.68 31.95 4512.98 3895.30 -523.47 3891.64 3926.69 97.66 17.98 BP_ MWD+IFR+MS
75 6336.22 95.68 113.67 30.33 4511.45 3925.34 -534.90 3919.68 3956.01 97.77 20.89 BP_ MWD+IFR+MS
76 6367.17 99.27 112.81 30.95 4507.43 3955.69 -547.00 3947.87 3985.58 97.89 11.92 BP_ MWD+IFR+MS
77 6397.86 99.59 108.98 30.69 4502.40 3985.80 -557.80 3976.15 4015.08 97.99 12.35 BP_ MWD+IFR+MS
78 6429.50 97.31 104.47 31.64 4497.74 4017.07 -566.80 4006.11 4046.01 98.05 15.83 BP_ MWD+IFR+MS
79 6458.84 96.21 101.22 29.34 4494.29 4046.18 -573.28 4034.51 4075.04 98.09 11.62 BP_ MWD+IFR+MS
80 6489.93 97.35 97.51 31.09 4490.62 4076.90 -578.30 4064.97 4105.90 98.10 12.40 BP_ MWD+IFR+MS
81 6520.39 96.20 93.14 30.46 4487.02 4106.72 -581.10 4095.08 4136.10 98.08 14.74 BP_ MWD+IFR+MS •
82 6550.42 94.97 92.81 30.03 4484.10 4135.96 -582.66 4124.92 4165.87 98.04 4.24 BP_ MWD+IFR+MS
83 6581.83 95.03 93.44 31.41 4481.36 4166.59 -584.36 4156.17 4197.05 98.00 2.01 BP_ MWD+IFR+MS
84 6611.97 94.47 98.08 30.14 4478.87 4196.24 -587.38 4186.04 4227.05 97.99 15.45 BP_ MWD+IFR+MS
85 6642.82 94.41 99.96 30.85 4476.48 4226.83 -592.20 4216.42 4257.80 97.99 6.08 BP_ MWD+IFR+MS
86 6673.85 92.49 102.21 31.03 4474.61 4257.73 -598.15 4246.81 4288.73 98.02 9.52 BP_ MWD+IFR+MS
87 6704.50 91.90 106.87 30.65 4473.43 4288.35 -605.84 4276.45 4319.15 98.06 15.31 BP_ MWD+IFR+MS
88 6735.41 92.06 112.17 30.91 4472.37 4319.13 -616.16 4305.56 4349.42 98.14 17.14 BP_ MWD+IFR+MS
89 6766.31 89.63 114.47 30.90 4471.91 4349.69 -628.39 4333.92 4379.24 98.25 10.83 BP_ MWD+IFR+MS
90 6796.85 88.53 117.49 30.54 4472.40 4379.66 -641.76 4361.37 4408.34 98.37 10.52 BP_ MWD+IFR+MS
SCHLUP~IBERGER Survey Report 19 -Aug-2006 08:36:49 Page 5 of 10
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
91 6828.47 88.34 117.27 31.6,2 4473.26 4410.52 -656.30 4389.44 4438.23 98.50 0.92 BP_ MWD+IFR+MS
92 6858.57 88.84 117.26 30.10 4474.00 4439.91 -670.08 4416.19 4466.73 98.63 1.66 BP_ MWD+IFR+MS
93 6888.94 89.63 113.18 30.37 4474.41 4469.78 -683.02 4443.65 4495.84 98.74 13.68 BP_ MWD+IFR+MS
94 6919.85 87.75 110.77 30.91 4475.12 4500.45 -694.58 4472.31 4525.92 98.83 9.89 BP_ MWD+IFR+MS
95 6950.52 90.01 108.76 30.67 4475.72 4531.00 -704.95 4501.16 4556.03 98.90 9.86 BP_ MWD+IFR+MS
96 6981.18 89.56 104.12 30.66 4475.83 4561.64 -713.62 4530.56 4586.42 98.95 15.20 BP_ MWD+IFR+MS •
97 7011.99 86.94 101.77 30.81 4476.77 4592.41 -720.52 4560.57 4617.13 98.98 11.42 BP_ MWD+IFR+MS
98 7042.90 86.32 102.40 30.91 4478.59 4623.23 -726.98 4590.74 4647.94 99.00 2.86 BP_ MWD+IFR+MS
99 7075.07 85.81 103.97 32.17 4480.80 4655.31 -734.30 4621.99 4679.95 99.03 5.12 BP_ MWD+IFR+MS
100 7106.69 87.90 106.91 31.62 4482.53 4686.87 -742.71 4652.41 4711.32 99.07 11.40 BP_ MWD+IFR+MS
101 7138.41 88.18 108.03 31.72 4483.62 4718.54 -752.22 4682.65 4742.69 99.13 3.64 BP_ MWD+IFR+MS
102 7170.27 87.13 108.27 31.86 4484.92 4750.32 -762.14 4712.90 4774.13 99.19 3.38 BP_ MWD+IFR+MS
103 7202.67 87.97 109.09 32.40 4486.31 4782.62 -772.51 4743.57 4806.06 99.25 3.62 BP_ MWD+IFR+MS
104 7234.08 87.69 107.81 31.41 4487.50 4813.95 -782.44 4773.34 4837.04 99.31 4.17 BP_ MWD+IFR+MS
105 7265.93 87.18 108.48 31.85 4488.92 4845.72 -792.35 4803.58 4868.49 99.37 2.64 BP_ MWD+IFR+MS
106 7298.03 88.06 109.15 32.10 4490.25 4877.71 -802.69 4833.93 4900.13 99.43 3.44 BP_ MWD+IFR+MS
107 7330.18 87.94 110.82 32.15 4491.38 4909.72 -813.67 4864.13 4931.71 99.50 5.20 BP_ MWD+IFR+MS
108 7361.30 88.53 110.90 31.12 4492.33 4940.66 -824.75 4893.19 4962.21 99.57 1.91 BP_ MWD+IFR+MS
109 7392.79 86.54 110.79 31.49 4493.69 4971.95 -835.95 4922.59 4993.07 99.64 6.33 BP_ MWD+IFR+MS
110 7425.60 82.95 109.63 32.81 4496.69 5004.47 -847.23 4953.25 5025.18 99.71 11.49 BP_ MWD+IFR+MS
111 7457.14 82.24 111.29 31.54 4500.76 5035.60 -858.16 4982.55 5055.91 99.77 5.68 BP_ MWD+IFR+MS .
112 7489.57 81.64 110.27 32.43 4505.31 5067.54 -869.55 5012.57 5087.44 99.84 3.62 BP_ MWD+IFR+MS
113 7521.58 82.53 111.41 32.01 4509.71 5099.08 -880.83 5042.20 5118.56 99.91 4.49 BP_ MWD+IFR+MS
114 7553.29 82.28 111.38 31.71 4513.91 5130.31 -892.30 5071.47 5149.37 99.98 0.79 BP_ MWD+IFR+MS
115 7586.09 83.92 114.93 32.80 4517.85 5162.53 -905.10 5101.40 5181.07 100.06 11.85 BP_ MWD+IFR+MS
116 7617.16 88.33 117.85 31.07 4519.95 5192.89 -918.88 5129.16 5210.82 100.16 17.01 BP_ MWD+IFR+MS
117 7649.20 90.17 118.36 32.04 4520.37 5224.08 -933.97 5157.42 5241.30 100.26 5.96 BP_ MWD+IFR+M5
118 7680.21 90.01 117.77 31.01 4520.32 5254.28 -948.56 5184.78 5270.84 100.37 1.97 BP_ MWD+IFR+MS
119 7711.82 89.97 118.79 31.61 4520.32 5285.03 -963.54 5212.62 5300.92 100.47 3.23 BP_ MWD+IFR+MS
120 7743.28 91.05 119.65 31.46 4520.04 5315.51 -978.89 5240.07 5330.72 100.58 4.39 BP_ MWD+IFR+MS
SCHLUMBERGER Survey Report 19 -Aug-2006 08:36:49 Page 6 of 10
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (f t) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
121 7775.36 91.07 120.38 32.08 4519.45 5346.48 -994.94 5267.84 5360.98 100.70 2.28 BP _MWD+IFR+MS
122 7806.94 90.36 119.13 31.58 4519.05 5377.00 -1010.61 5295.26 5390.83 100.81 4.55 BP _MWD+IFR+MS
123 7838.93 89.84 120.23 31.99 4519.00 5407.94 -1026.45 5323.05 5421.11 100.91 3.80 BP _MWD+IFR+MS
124 7870.68 89.19 117.21 31.75 4519.27 5438.76 -1041.70 5350.89 5451.35 101.02 9.73 BP _MWD+IFR+MS
125 7902.94 88.31 112.93 32.26 4519.97 5470.50 -1055.37 5380.10 5482.63 101.10 13.54 BP _MWD+IFR+MS
126 7934.68 87.75 114.04 31.74 4521.06 5501.87 -1068.01 5409.19 5513.62 101.17 3.92 BP _MWD+IFR+MS
127
7966.45
87.45
114.00
31.77
4522.39
5533.21
-1080.93
5438.18
5544.57
101.24
0.95
BP
_MWD+IFR+MS •
128 7998.18 86.64 112.63 31.73 4524.03 5564.56 -1093.47 5467.28 5575.56 101.31 5.01 BP _MWD+IFR+MS
129 8029.62 87.87 111.38 31.44 4525.54 5595.72 -1105.23 5496.40 5606.42 101.37 5.57 BP _MWD+IFR+MS
130 8061.64 87.75 111.08 32.02 4526.76 5627.52 -1116.82 5526.22 5637.95 101.43 1.01 BP _MWD+IFR+MS
131 8093.05 87.66 110.78 31.41 4528.02 5658.73 -1128.03 5555.54 5668.90 101.48 1.00 BP _MWD+IFR+MS
132 8124.77 89.05 111.71 31.72 4528.93 5690.24 -1139.52 5585.09 5700.15 101.53 5.27 BP _MWD+IFR+MS
133 8156.94 89.18 110.09 32.17 4529.42 5722.23 -1151.00 5615.14 5731.89 101.58 5.05 BP _MWD+IFR+MS
134 8188.60 88.69 108.57 31.66 4530.01 5753.79 -1161.47 5645.01 5763.25 101.63 5.04 BP _MWD+IFR+M5
135 8219.96 88.73 109.06 31.36 4530.72 5785.07 -1171.58 5674.68 5794.36 101.67 1.57 BP _MWD+IFR+MS
136 8252.07 88.92 110.76 32.11 4531.38 5817.05 -1182.52 5704.87 5826.13 101.71 5.33 BP _MWD+IFR+MS
137 8283.84 88.76 111.00 31.77 4532.02 5848.64 -1193.84 5734.54 5857.49 101.76 0.91 BP _MWD+IFR+MS
138 8314.86 90.18 109.33 31.02 4532.31 5879.53 -1204.53 5763.66 5888.18 101.80 7.07 BP _MGVD+IFR+MS
139 8347.51 88.19 106.13 32.65 4532.77 5912.13 -1214.47 5794.75 5920.65 101.84 11.54 BP _MWD+IFR+MS
140 8379.47 87.68 104.26 31.96 4533.92 5944.07 -1222.84 5825.57 5952.53 101.85 6.06 BP _MWD+IFR+MS
141 8411.11 90.93 103.19 31.64 4534.31 5975.70 -1230.35 5856.30 5984.15 101.86 10.81 BP _MWD+IFR+MS .
142 8443.26 90.61 101.32 32.15 4533.88 6007.81 -1237.17 5887.71 6016.29 101.87 5.90 BP _MWD+IFR+MS
143 8474.77 90.04 101.27 31.51 4533.70 6039.25 -1243.34 5918.61 6047.80 101.86 1.82 BP _MWD+IFR+MS
144 8506.53 89.52 101.48 31.76 4533.82 6070.95 -1249.61 5949.75 6079.56 101.86 1.77 BP _MWD+IFR+MS
145 8538.58 88.95 101.85 32.05 4534.25 6102.95 -1256.09 5981.13 6111.60 101.86 2.12 BP _MWD+IFR+MS
146 8570.22 88.24 100.77 31.64 4535.02 6134.52 -1262.29 6012.15 6143.23 101.86 4.08 BP _MWD+IFR+MS
147 8602.24 89.15 101.52 32.02 4535.75 6166.46 -1268.48 6043.56 6175.24 101.85 3.68 BP _MWD+IFR+MS
148 8633.81 90.81 100.90 31.57 4535.76 6197.96 -1274.61 6074.52 6206.81 101.85 5.61 BP _MWD+IFR+MS
149 8665.64 90.51 99.81 31.83 4535.40 6229.69 -1280.33 6105.83 6238.62 101.84 3.55 BP _MWD+IFR+MS
150 8697.53 90.83 100.47 31.89 4535.02 6261.46 -1285.95 6137.22 6270.50 101.83 2.30 BP _MWD+IFR+MS
SCHLUMBERGER Survey Report 19 -Aug-2006 08:36:49 Page 7 of 10
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
151 8729.30 90.78 98.78 31.77 4534.58 6293.09 -1291.26 6168.54 6302.24 101.82 5.32 BP _MWD+IFR+MS
152 8761.14 90.63 98.88 31.84 4534.19 6324.75 -1296.15 6200.00 6334.03 101.81 0.57 BP _MWD+IFR+MS
153 8793.01 91.16 100.15 31.87 4533.69 6356.48 -1301.41 6231.43 6365.87 101.80 4.32 BP _MWD+IFR+MS
154 8824.97 91.44 102.62 31.96 4532.96 6388.37 -1307.72 6262.75 6397.82 101.79 7.78 BP _MWD+IFR+MS
155 8856.71 91.09 104.69 31.74 4532.26 6420.09 -1315.21 6293.58 6429.54 101.80 6.61 BP _MWD+IFR+MS
156 8888.39 92.01 106.28 31.68 4531.41 6451.75 -1323.67 6324.10 6461.14 101.82 5.80 BP _MWD+IFR+MS
157
8921.25
91.74
105.67
32.86
4530.33
6484.59
-1332.70
6355.67
6493.90
101.84
2.03
BP
_MWD+IFR+MS •
158 8952.35 91.19 106.03 31.10 4529.54 6515.68 -1341.20 6385.58 6524.91 101.86 2.11 BP _MWD+IFR+MS
159 8982.39 90.25 105.65 30.04 4529.16 6545.71 -1349.39 6414.48 6554.87 101.88 3.38 BP _MWD+IFR+MS
160 9016.73 88.72 105.57 34.34 4529.47 6580.05 -1358.63 6447.55 6589.14 101.90 4.46 BP _MWD+IFR+MS
161 9048.72 88.61 106.56 31.99 4530.21 6612.02 -1367.48 6478.28 6621.04 101.92 3.11 BP _MWD+IFR+MS
162 9080.10 88.20 105.98 31.38 4531.08 6643.38 -1376.27 6508.39 6652.31 101.94 2.26 BP _MWD+IFR+MS
163 9112.56 87.58 106.52 32.46 4532.28 6675.81 -1385.35 6539.53 6684.66 101.96 2.53 BP _MWD+IFR+MS
164 9144.28 86.95 104.95 31.72 4533.79 6707.49 -1393.94 6570.03 6716.27 101.98 5.33 BP _MWD+IFR+MS
165 9175.92 87.62 105.75 31.64 4535.29 6739.09 -1402.31 6600.50 6747.82 101.99 3.30 BP _MWD+IFR+MS
166 9206.91 88.03 107.10 30.99 4536.47 6770.05 -1411.06 6630.21 6778.70 102.01 4.55 BP _MWD+IFR+MS
167 9239.37 87.79 106.20 32.46 4537.65 6802.47 -1420.36 6661.29 6811.03 102.04 2.87 BP _MWD+IFR+MS
168 9271.62 85.30 105.54 32.25 4539.60 6834.65 -1429.16 6692.25 6843.15 102.05 7.99 BP _MWD+IFR+MS
169 9303.59 86.88 105.11 31.97 4541.78 6866.55 -1437.59 6723.01 6874.99 102.07 5.12 BP _MWD+IFR+MS
170 9335.20 87.31 106.25 31.61 4543.38 6898.11 -1446.12 6753.40 6906.50 102.09 3.85 BP MWD+IFR+MS
171 9367.80 86.99 105.51 32.60 4545.00 6930.67 -1455.03 6784.72 6938.99 102.10 2.47 BP _MWD+IFR+MS
172 9399.07 86.14 106.22 31.27 4546.87 6961.88 -1463.56 6814.74 6970.13 102.12 3.54 BP _MWD+IFR+M5
173 9430.61 88.09 107.53 31.54 4548.46 6993.36 -1472.71 6844.89 7001.52 102.14 7.45 BP _MWD+IFR+MS
174 9462.52 88.10 111.90 31.91 4549.52 7025.13 -1483.46 6874.90 7033.13 102.18 13.69 BP _MWD+IFR+MS
175 9494.49 87.96 114.93 31.97 4550.62 7056.72 -1496.16 6904.22 7064.47 102.23 9.48 BP MWD+IFR+MS
176 9526.45 87.71 113.96 31.96 4551.83 7088.22 -1509.37 6933.29 7095.69 102.28 3.13 BP _MWD+IFR+MS
177 9558.94 87.81 115.11 32.49 4553.10 7120.23 -1522.86 6962.83 7127.41 102.34 3.55 BP _MWD+IFR+MS
178 9590.86 88.32 117.28 31.92 4554.18 7151.51 -1536.94 6991.45 7158.39 102.40 6.98 BP _MWD+IFR+MS
179 9622.73 86.94 119.27 31.87 4555.49 7182.49 -1552.02 7019.49 7189.02 102.47 7.59 BP _MWD+IFR+MS
180 9654.42 86.75 119.10 31.69 4557.24 7213.15 -1567.45 7047.11 7219.33 102.54 0.80 BP MWD+IFR+MS
SCHLUMBERGER Survey Report 19-Aug-2006 08:36:49 Page 8 of 10
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
-
--- (ft)
-------- (deg)
------ (deg)
------- (ft)
------ (ft)
-------- (ft)
-------- (ft)
-------- (ft)
-------- (ft)
------- (deg)
-------- 100f)
-----
- type (deg)
---- ------
181 9686.28 86.62 119.52 31.86 4559.08 7243.96 -1583.02 7074.85 7249.79 102.61 1.38 BP _MWD+IFR+MS
182 9718.50 86.26 119.15 32.22 4561.08 7275.10 -1598.77 7102.88 7280.59 102.69 1.60 BP _MWD+IFR+MS
183 9749.23 85.84 119.17 30.73 4563.20 7304.82 -1613.71 7129.66 7310.00 102.75 1.37 BP _MWD+IFR+MS
184 9781.28 85.79 118.57 32.05 4565.54 7335.84 -1629.15 7157.65 7340.71 102.82 1.87 BP _MWD+IFR+MS
185 9813.38 84.72 117.29 32.10 4568.19 7367.01 -1644.13 7185.91 7371.60 102.89 5.19 BP _MWD+IFR+MS
186 9845.01 85.55 118.15 31.63 4570.87 7397.74 -1658.79 7213.81 7402.07 102.95 3.77 BP _MWD+IFR+MS
187 9877.22 86.04 117.77 32.21 4573.24 7429.03 -1673.85 7242.18 7433.10 103.01 1.92 BP _MWD+IFR+MS
188 9909.08 85.77 119.35 31.86 4575.51 7459.91 -1689.04 7270.09 7463.72 103.08 5.02 BP _MWD+IFR+MS
189 9940.67 86.25 118.56 31.59 4577.71 7490.48 -1704.30 7297.67 7494.04 103.15 2.92 BP _MWD+IFR+MS
190 9972.33 86.61 120.52 31.66 4579.68 7521.05 -1719.88 7325.16 7524.35 103.21 6.28 BP _MWD+IFR+MS
191 10004.23 84.51 117.56 31.90 4582.15 7551.89 -1735.31 7352.96 7554.95 103.28 11.35 BP _MWD+IFR+MS
192 10036.26 85.32 119.67 32.03 4584.99 7582.88 -1750.59 7380.96 7585.72 103.34 7.03 BP _MWD+IFR+MS
193 10068.67 89.11 119.82 32.41 4586.57 7614.17 -1766.65 7409.06 7616.78 103.41 11.70 BP _MWD+IFR+MS
194 10100.46 89.14 119.92 31.79 4587.05 7644.88 -1782.48 7436.63 7647.26 103.48 0.33 BP _MWD+IFR+MS
195 10131.77 88.67 121.00 31.31 4587.65 7675.04 -1798.35 7463.61 7677.21 103.55 3.76 BP _MWD+IFR+MS
196 10163.82 88.15 120.50 32.05 4588.54 7705.86 -1814.73 7491.14 7707.82 103.62 2.25 BP _MWD+IFR+MS
197 10195.95 87.64 119.99 32.13 4589.72 7736.82 -1830.90 7518.88 7738.59 103.69 2.24 BP _MWD+IFR+MS
198 10227.33 88.25 118.46 31.38 4590.84 7767.21 -1846.21 7546.25 7768.81 103.75 5.25 BP _MWD+IFR+MS
199 10259.59 87.81 118.93 32.26 4591.95 7798.52 -1861.69 7574.53 7799.96 103.81 2.00 BP _MWD+IFR+MS
200 10291.31 87.91 117.83 31.72 4593.14 7829.35 -1876.76 7602.42 7830.64 103.87 3.48 BP _MWD+IFR+MS
201 10322.92 87.85 118.47 31.61 4594.31 7860.09 -1891.66 7630.27 7861.26 103.92 2.03 BP _MWD+IFR+MS •
202 10355.24 87.16 117.31 32.32 4595.71 7891.56 -1906.77 7658.81 7892.60 103.98 4.17 BP _MWD+IFR+MS
203 10387.05 88.35 116.52 31.81 4596.96 7922.65 -1921.15 7687.15 7923.58 104.03 4.49 BP _MWD+IFR+MS
204 10418.78 88.19 116.22 31.73 4597.92 7953.73 -1935.24 7715.56 7954.56 104.08 1.07 BP _MWD+IFR+MS
205 10451.08 89.25 115.94 32.30 4598.64 7985.41 -1949.44 7744.57 7986.15 104.13 3.39 BP _MWD+IFR+MS
206 10482.84 88.79 116.88 31.76 4599.18 8016.53 -1963.56 7773.01 8017.18 104.18 3.29 BP _MWD+IFR+MS
207 10514.96 88.02 115.89 32.12 4600.08 8047.99 -1977.83 7801.77 8048.57 104.23 3.90 BP _MWD+IFR+MS
208 10546.58 88.88 114.45 31.62 4600.93 8079.09 -1991.27 7830.38 8079.60 104.27 5.30 BP _MWD+IFR+MS
209 10578.25 88.90 113.98 31.67 4601.55 8110.34 -2004.26 7859.25 8110.79 104.31 1.49 BP _MWD+IFR+MS
210 10610.32 88.39 112.93 32.07 4602.30 8142.05 -2017.02 7888.67 8142.45 104.34 3.64 BP _MWD+IFR+MS
SCHLUNIBERGER Survey Report 19 -Aug-2006 08:36:49 Page 9 of 10
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (f t) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
211 10641.49 88.24 114.20 31.17 4603.22 8172.85 -2029.48 7917.22 8173.20 104.38 4.10 BP _MWD+IFR+MS
212 10674.25 88.80 115.54 32.76 4604.07 8205.10 -2043.25 7946.94 8205.40 104.42 4.43 BP _MWD+IFR+MS
213 10705.65 88.12 118.89 31.40 4604.91 8235.77 -2057.60 7974.85 8236.01 104.47 10.88 BP _MWD+IFR+MS
214 10737.80 86.81 119.50 32.15 4606.33 8266.89 -2073.27 8002.88 8267.08 104.52 4.49 BP _MWD+IFR+MS
215 10770.11 86.38 119.21 32.31 4608.25 8298.12 -2089.08 8030.99 8298.26 104.58 1.60 BP _MWD+IFR+MS
216 10801.76 87.76 122.25 31.65 4609.87 8328.53 -2105.23 8058.16 8328.62 104.64 10.54 BP _MWD+IFR+MS
217 10833.91 91.24 121.38 32.15 4610.15 8359.28 -2122.18 8085.47 8359.34 104.71 11.16 BP _MWD+IFR+MS
218 10865.85 91.37 120.45 31.94 4609.42 8389.98 -2138.58 8112.87 8390.00 104.77 2.94 BP _MWD+IFR+MS
219 10897.45 90.88 119.58 31.60 4608.80 8420.48 -2154.38 8140.23 8420.49 104.82 3.16 BP _MWD+IFR+MS
220 10929.25 90.71 119.97 31.80 4608.36 84.51.21 -2170.17 8167.82 8451.21 104.88 1.34 BP _MWD+IFR+MS
221 10960.75 90.26 118.63 31.50 4608.09 8481.72 -2185.59 8195.29 8481.72 104.93 4.49 BP _MWD+IFR+MS
222 10993.07 91.75 119.14 32.32 4607.53 8513.08 -2201.20 8223.59 8513.09 104.99 4.87 BP _MWD+IFR+MS
223 11025.40 91.81 117.25 32.33 4606.52 8544.53 -2216.47 8252.07 8544.55 105.03 5.85 BP _MWD+IFR+MS
224 11056.58 91.49 116.01 31.18 4605.63 8575.04 -2230.44 8279.93 8575.08 105.08 4.11 BP _MWD+IFR+MS
225 11088.92 93.09 116.85 32.34 4604.33 8606.71 -2244.82 8308.86 8606.76 105.12 5.59 BP _MWD+IFR+MS
226 11120.47 92.90 115.55 31.55 4602.68 8637.60 -2258.73 8337.13 8637.68 105.16 4.16 BP _MWD+IFR+MS
227 11152.26 92.52 115.22 31.79 4601.18 8668.83 -2272.34 8365.82 8668.94 105.20 1.58 BP _MWD+IFR+MS
228 11183.48 92.08 115.94 31.22 4599.93 8699.48 -2285.81 8393.96 8699.62 105.23 2.70 BP _MWD+IFR+MS
229 11215.47 90.60 114.65 31.99 4599.18 8730.94 -2299.47 8422.87 8731.11 105.27 6.14 BP _MWD+IFR+MS
230 11247.98 90.52 110.37 32.51 4598.86 8763.16 -2311.92 8452.90 8763.36 105.30 13.17 BP _MWD+IFR+MS
231 11279.78 91.40 107.38 31.80 4598.33 8794.87 -2322.20 8482.98 8795.08 105.31 9.80 BP _MWD+IFR+MS •
232 11312.42 91.08 107.45 32.64 4597.62 8827.47 -2331.97 8514.11 8827.70 105.32 1.00 BP _MWD+IFR+MS
233 11344.52 90.31 104.92 32.10 4597.23 8859.56 -2340.91 8544.94 8859.79 105.32 8.24 BP _MWD+IFR+MS
234 11375.75 87.94 104.58 31.23 4597.71 8890.78 -2348.86 8575.13 8891.01 105.32 7.67 BP _MWD+IFR+MS
235 11407.98 87.24 103.89 32.23 4599.07 8922.98 -2356.78 8606.34 8923.20 105.31 3.05 BP _MWD+IFR+MS
236 11439.61 87.06 104.99 31.63 4600.64 8954.57 -2364.66 8636.94 8954.79 105.31 3.52 BP _MWD+IFR+MS
237 11471.40 86.71 104.84 31.79 4602.37 8986.31 -2372.83 8667.61 8986.53 105.31 1.20 BP _MWD+IFR+MS
238 11503.69 86.41 104.70 32.29 4604.30 9018.55 -2381.05 8698.78 9018.76 105.31 1.02 BP _MWD+IFR+MS
239 11535.16 85.93 103.92 31.47 4606.41 9049.94 -2388.81 8729.20 9050.16 105.30 2.91 BP _MWD+IFR+MS
240 11567.34 87.38 105.06 32.18 4608.28 9082.07 -2396.85 8760.30 9082.28 105.30 5.73 BP MWD+IFR+MS
SCHLiJMBERGER Survey Report 19 -Aug-2006 08:36:49 Page 10 of 10
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
241 11599.24 87.75 106.49 31.90 4609.64 9113.93 -2405.51 8790.97 9114.15 105.30 4.63 BP_MWD+IFR+MS
242 11631.34 87.24 105.00 32.10 4611.04 9146.00 -2414.21 8821.84 9146.21 105.31 4.90 BP_MWD+IFR+MS
243 11662.83 88.69 107.31 31.49 4612.16 9177.46 -2422.97 8852.06 9177.68 105.31 8.66 BP_MWD+IFR+MS
244 11694.90 88.89 106.75 32.07 4612.84 9209.50 -2432.36 8882.72 9209.73 105.31 1.85 BP_MWD+IFR+MS
245 11726.70 88.86 106.25 31.80 4613.46 9241.28 -2441.39 8913.20 9241.51 105.32 1.57 BP_MWD+IFR+MS
246 11758.28 88.42 106.61 31.58 4614.21 9272.84 -2450.32 8943.49 9273.08 105.32 1.80 BP_MWD+IFR+MS •
247 11789.54 88.09 106.70 31.26 4615.16 9304.07 -2459.27 8973.42 9304.32 105.33 1.09 BP_MWD+IFR+MS
248 11822.02 87.45 106.19 32.48 4616.43 9336.51 -2468.46 9004.55 9336.76 105.33 2.52 BP_MWD+IFR+MS
249 11853.45 87.09 106.87 31.43 4617.92 9367.90 -2477.39 9034.65 9368.15 105.33 2.45 BP_MWD+IFR+MS
250 11878.39 87.04 105.30 24.94 4619.20 9392.80 -2484.29 9058.58 9393.06 105.34 6.29 BP_MWD+IFR+MS
251 11925.00 87.04 105.30 46.61 4621.61 9439.34 -2496.58 9103.47 9439.61 105.34 0.00 Projected to TD
[(c)2006 IDEAL ID10_2C_01]
• •
Schlumberger Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc.
Well No L-204L3
Installation/Rig
Nabors 9ES
Dispatched To: Helen Warman (AOGCC-
Date Dispatched: 28-Sep-06
Dispatched By: Emil Guliyev
Data No Of Prints No of Floppies
Surveys 2 1
Please sign and return to: James H. Johnson
Received By: ~ BP Exploration (Alaska) Inc.
Petrotechnical Data Center ILR2-1)
i / ~ ~ ~ ~ 900 E. Benson Blvd.
v(1 Anchorage, Alaska 99508
Fax:907-564-4005
e-mail address: johnsojhC~bp.com
LWD Log DeliveryVi.1, 10-02-03
LJ
'~ I ~ ~
~
~
i i ~ 7
:~
r
~t ~ +K ,; _, ~
ALASSIA OIL A1~TD ~irA.S
COI~TSERQATI011T CODII~'IISSIOI~T
Robert Tirpack
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage, AK 99519-6612
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: Prudhoe Bay Field, Orion Schrader Bluff Oil Pool, PBU L-204L3
BP Exploration (Alaska) Inc.
Permit No: 206-095
Surface Location: 2423' FSL, 3544' FEL, SEC. 34, T 12N, R 11 E, UM
Bottomhole Location: 11' FNL, 294' FWL, SEC. 01, T 11 N, R 11 E, UM
Dear Mr. Tirpack:
Enclosed is the approved application for permit to drill the above referenced
development well.
This permit to drill does not exempt you from obtaining additional permits or an
approval required by law from other governmental agencies and does not authorize
conducting drilling operations until all other required permits and approvals have
been issued. In addition, the Commission reserves the right to withdraw the
permit in the event it was erroneously issued.
The permit is for a new wellbore segment of existing well PBU L-204, Permit No.
206-092, API No. 50-029-23314-00. Production should continue to be reported as
a function of the original API number stated above.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter
25 of the Alaska Administrative Code unless the Commission specifically
authorizes a variance. Failure to comply with an applicable provision of AS 31.05,
Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or
the terms and conditions of this permit may result in the revocation or suspension
of the permit. When providing notice for a representative of the Commission to
witness any required test, contact the Commissio petroleum field inspector at
(907) 659-3607 (pager).
DATED this t7 day of July, 2006
r~
FRANK H. MURKOWSKI, GOVERNOR
cc: Department of Fish 8v Game, Habitat Section w/o encl.
Department of Environmental Conservation w/ o encl.
F~^~'lV C
STATE OF ALASKA
~`~~ ALA~OIL AND GAS CONSERVATION COMW~ON JUN 2 9 2006
~~ ~ _4 PERMIT TO DRILL .
20 AAC 25.005 Alaska Dil & Gas Cons. Cornmi~3i~~
l _ _L-_-
1 a. Type of work
^ Drill ®Redrill
^ Re-Entry 1 b. Current Well Class O Exploratory ^ Development Gas
^ Service ^ Multiple Zone
^ Stratigraphic Test ®Development Oii ^ Single Zone 1 c. Specify if well is pr
^ Coalbed Methane ^ Gas Hydrates
^ Shale Gas
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well
Bond No. 6194193 11. Well Name and Number:
PBU L-204L3
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth:
MD 11947 TVD 4594 12. Field /Pool(s):
Prudhoe Bay Field / Orion
4a. Location of Well (Governmental Section):
Surface:
2423' FSL
3544' FEL
SEC
34
T12N
R11 E
UM 7. Property Designation:
ADL 028240 Schrader Bluff
,
,
,
,
.
,
Top of Productive Horizon:
1855' FSL, 512' FWL, SEC. 35, T12N, R11 E, UM (OBa) 8. Land Use Permit: 13. Approximate Spud Date:
July 17, 2006
Total Depth:
11' FNL, 294' FWL, SEC. 01, T11 N, R11 E, UM 9. Acres in Property:
2560 14. Distance to Nearest Property:
8550'
4b. Location of Well (State Base Plane Coordinates):
Surface: x-583372 y-5978147 Zone-ASP4 10. KB Elevation Plan
(Height above GL): 78.6 feet 15. Distance to Nearest Well Within Pool:
190'
16. Deviated Wells: Kickoff Depth: 6042 feet
Maximum Hole Angle: 100 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 2010 Surface: 1558
18. Casin Pro ram: S ecifications To -iSettin D 'th -Bottom Quanti of Cement, c.f. or sacks
Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data
6-3/4" 4-1/2" 12.6# L-80 IBT 5930' 6017' 4429' 11947' 4594' Uncemented Slotted Liner
19. PRESENT WELL CONDITION SUMMARY`(To be completed for Redrill and Re-entry Operations)
Total Depth MD (ft):
11981 Total Depth TVD (ft):
4694 Plugs (measured):
None Effective Depth MD (ft):
11981 Effective Depth TVD (ft):
4694 Junk (measured):
None
Casing: length Size Cement Volume MD TVD
Conductor /Structural 110' 20" x 34" 260 sx Arctic Set A rox. 110' 110'
Surface 3449' 10-3/4" 602 sx AS Lite, 403 sx Class 'G' 3449' 2794'
Intermediate 6706' 7-5/8" 561 sx Class 'G' 6706' 4629'
Production
Liner 4850' 4-1/2" Uncemented Slotted Liner (OBc 7131' - 11981' 4639' - 4694'
Liner OBd 5776' 4-1/2" Uncemented Slotted Liner 6200' - 11976' 4511' - 4749'
Liner OBb 5839' 4-1/2" Uncemented Slotted Liner 6122' - 11961' 4479' - 4644'
Perforation Depth MD (ft): None Perforation Depth TVD (ft): None
20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis
® Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct. Contact Scott Kolstad, 564-5347
Printed Name Robert Tirpack Title Senior Drilling Engineer
Prepared By Name/Number:
Si nature Phone 564-4166 Date G ~~`~ Terrie Hubble, 564-4628
Commission Use Only
Permit To Drill
Number: ~ 06 • O jr 5 API Number:
50-6 2 -~ ~, ~ 3~ ~ ~~- Permit Approval
Date: - See cover letter for
other requirements
Conditions of Approval:
If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrate or gas contained shales
Samples Req'd: ^ Yes ~No d Log Req'd: ^ Yes '~No
T~ Sf too ~'E -~O 3 S o o ~ ~' , HZS Measures: Yes ^ No , Di c ' Survey Req'd: Yes ^ No
Other:
~wr sutc.~-~ ~ 2o/4~CLs .vas C~,] r!, )~ o~,~~ii~,~ 2. P~oPt ~ i s ~ ~~ tie
~~ I-~ ~„a~ PROVED BY THE COMMISSIO
Date 1 ,COMMISSIONER
Form 10-401 Revised 12/2005 ~ ~ Y. ~ ~ ~a, ~ ~`_,~ [_tk ~ ~-~" - / ~"" Submit In uupucate
f `/
~.,.r
• ~
Well Name: L-204, L-204L1, L-204L2,
L-204L3, & L-204L4
Drill and Complete Plan Summary
Type of Well (producer or injector): I Schrader Bluff OA, OBa, OBb, OBc, and OBd Multi-Lat
producer
Surface Location: X = 583,371.74 Y = 5,978,146.73
As Built Sec 34, T 12N, R 11 E, 2423' FSL & 3544' FEL
L-204 OBc Target Start: X = 588,460 Y = 5,977,320 Z = -4510 TVDSS
Sec 35, T 12N, R11 E, FEL: 3746.46 FSL: 1538.03
L-204 OBc Target End: X = 592,520 Y = 5,975,820 Z = -4615 TVDSS
Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81
L-204L1 OBd Target Start: X = 587,630 Y = 5,977,625 Z = -4550 TVDSS
Sec 35, T 12N, R11 E, FEL: 4572.43 FSL: 1852.93
L-204L1 OBd Target End: X = 592,520 Y = 5,975,820 Z = -4670 TVDSS
Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81
L-204L2 OBb Target Start: X = 587,455 Y = 5,977,625 Z = -4430 TVDSS
Sec 35, T 12N, R11 E, FEL: 4747.41 FSL: 1855.03
L-204L2 OBb Target End: X = 592,520 Y = 5,975,820 Z = -4565 TVDSS
Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81
L-204L3 OBa Target Start: X = 587,435 Y = 5,977,625 Z = -4385 TVDSS
Sec 35, T 12N, R11 E, FEL: 4767.41 FSL: 1855.26
L-204L3 OBa Target End: X = 592,520 Y = 5,975,820 Z = -4515 TVDSS
Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81
L-204L4 OA Target Start: X = 587,350 Y = 5,977,625 Z = -4325 TVDSS
Sec 35, T 12N, R11 E, FEL: 4852.40 FSL: 1856.26
L-204L4 OA Target End: X = 592,520 Y = 5,975,820 Z = -4455 TVDSS
Sec 1, T 11 N, R11 E, FEL: 4985.85 FSL: 5268.81
AFE Number: TBD Ri Nabors 9ES GL: 50.1 RT: 28.5 RTE: 78.6
Estimated Start Date: July 17, 2006 O eratin da s to com lete: 50
Well Information
Distance to Nearest Property:
Distance to Nearest Well in Pool:
Well Type:
Current Status:
Conductor:
BHT:
BHP:
8550' to PBU boundary
190' from L-104 at 6,940' in L-204
Schrader O-sand Penta-lateral Producer
New well
20" X 34", 215.5 ppf, A53, ERW set at 110' KB
85 °F ~ 4290' TVDss
90 °F ~ 4525' TVDss
8.3 - 8.6 EMW ppg in Schrader OBd sands
Permit to Drill 6/21/06
• ~
Formation Markers:
7 Formation To s TVD ss and Est. Pore Pressures
Est. Formation
To s
Uncertain Commercial
Hydrocarbon
Bearin Est.
Pore
Press. Est.
Pore
Press.
Formation TVDss feet Yes/No Psi
G1 -255 +/-50' No 115 8.7
Fault #1 - L Pad Fault -880 +/- 100' No - -
SV6 faulted to -880 +/-50' No 396 8.7
SV5 -1480 +/-50' No 666 8.7
SV4 -1610 +/-50' No 725 8.7
Base Permafrost -1685 +/-50' No 758 8.7
SV3 -1985 +/-50' Gas H orates 893 8.7
SV2 -2155 +/-50' Gas H orates 970 8.7
SVl -2490 +/-50' Gas H orates 1121 8.7
UG4 -2795 +/-50' Thin coal 1258 8.7
UG4A
-2825
+/-50' Heavy Oil
between-2800
and -2860' SS
1271
8.7
UG3 -3190 +/-50' Thin coals 1436 8.7
UG1
-3695
+/-50' Heavy Oil from -
3820 to -3995'
sS
1663
8.7
Fault #2 -3890 +/- 100' No - -
UG Ma faulted to -3890 +1-50' Yes 1751 8.7
UG_Mb1 -3910 +/-50' Yes - -
UG_Mb2 -3970 +/-50' Yes 1787 8.7
UG_Mc -4065 +/-50' No Wet 1829 8.7
SB_Na -4130 +/-25' No Wet 1859 8.7
SB_Nb -4160 +/-25' No Wet 1872 8.7
SB_Nc -4190 +/-25' No wet 1886 8.7
SB_Ne -4200 +/-25' No Wet 1890 8.7
SB_OA
-4290
+/-25'
Yes 1840-
1900 8.3 -
8.6
SB_OBa
-4360
+/-25'
Yes 1870-
1940 8.3 -
8.6
SB_OBb
-4405
+/-25'
Yes 1890-
1960 8.3 -
8.6
SB_OBc -4465 +/-25' Yes 1985 8.6
SB_OBd
-4525
+/-25'
Yes 1940-
2010 8.3 -
8.6
SB_OBe not reached +/-25' Yes
Well TD Criteria
TD for all laterals will be at end of polygon. No extensions beyond the end of the
polygons are planned.
Comments
G1 through Nf formation pressures were estimated based on hydrostatic gradients
extrapolated at .45 psifft gradient down from surface. O sand pressures were
extrapolated from L-i20 and V-102 MDT pressures, but are assumed to be slightly to
moderately depleted (except OBc) in the L-204 area due to L-201 .production.
2 Permit to Drill 6-21-06
• •
Mud Program:
13-1/2" Surface Hole Mud Pro erties: Spud -Freshwater Mud
Interval Densi Funnel vis YP PH FL
Initial 8.5 - 9.1 250-300 50-70 8.5-9.0 NC-8.0
Base Perm 9.0 - 9.5 200-250 30-45 8.5-9.0 8.0
Interval TD 9.6 max 200-250 30-40 8.5-9.0 5.0-7.0
9-7/8" Intermediate Hole Mud Pro erties: Freshwater Mud (LSND)
Interval Densi YP PV API Filtrate MBT H Chlorides
Surface shoe to interval TD 8.8 - 9.3 22-30 12-18 4-6 < 20 9.0-9.5 <600
6-3/4" Production Hole Mud Pro erties: LVT-200 MOBM (Versa-Pro)
Interval Densi Stabili Oil: Water Ratio YP PV API Filtrate MBT
All five Laterals 9.2 650-900 80:20, initial 15-19 <20 4-5.5 < 6
Surve and Lo in Pro ram:
13-1/2" Hole Section: Surface Gyro may be needed
O en Hole: MWD / GR
Cased hole: None
9-7/8" Intermediate Hole: Surveys will be IIFR corrected real time and multi-station
O en hole: MWD / GR / Res / Azimuthal Den / Neu / PWD
Cased Hole: None
6-3/4" Produciton Holes: Surveys will be IIFR corrected real time and multi-station
O en hole: MWD / GR / Res / Azimuthal Den / Neu /AIM / PW D
Cased Hole: N/A
Casing/Tubing Program
Hole Size Csg /
Tb O.D. WUFt Grade Conn Burst
si Collapse
si Length Top
MD /TVD Bottom
MD /TVD
48" 20" X 34" 215.5# A53 Weld GL 110'/110'
13-'/z" 10-3/a" 45.5# K-55 BTC 3,580 2,090 3449' GL 3449' / 2794'
9--%e" 7 5/a" 29.7# L-80 BTC-M
/ TC-II 6,890 4,790 6706' GL 6706' / 4629'
6-3/a" OBd 4-'/2" slotted 12.6# L-80 IBT N/A N/A 5776' 6200' / 4511' 11976' / 4749'
6-3/a" OBc 4-%z" slotted 12.6# L-80 IBT N/A N/A 4850' 7131' / 4639' 11981' / 4694
6-3/a" OBb 4-%2" slotted 12.6# L-80 IBT N/A N/A 5839' 6122' J 4479' 11961' / 4644'
6-3/a" OBa 4-~/z" slotted 12.6# L-80 IBT N/A N/A 5930' 6017' / 4429' 11947' / 4594'
6-3/a" OA 4-%2"slotted 12.6# L-80 IBT N/A N/A 6045' 5876' / 4352' 11921' / 4534'
Tubin 4-'/2" 12.6# L-80 IBT-M 8,430 7,500 5800' GL 5800' / 4305'
Surface and Anti-Collision Issues
Surface Shut-in Wells:
L-104 and L-106 will require surface shut-in and well house removal in order to move over well L-204. No other
wells should require well house removal and surface shut-in.
Close Approach Shut-in Wells: One well will require subsurface isolation for this profile. L-104 will remain shut in
until all 5 laterals pass the close approach depth.
3 Permit to Drill 6-21-06
•
Close Approach Well List:
•
Lateral Well Ctr-Ctr Reference Allowable Precautionary
Name Distance MD Deviation Comment
OBc L-104 190' 6940 -27.71 Use Traveling
C linder
OBb L-104 197.26 6836.1 180.18 Use Traveling
C linder
OBa L-104 221.31 6772 203.39 Use Traveling
C finder
OA L-104 211.84 6516 198.88 Use Traveling
C linder
Cement Calculations
Casino Size: 10-3/a -in 45.5-Ib/ft K-55 BTC surface casin
Basis: Lead: 250% excess over gauge hole in permafrost, 30% excess over gauge hole below permafrost
Lead TOC: Surface
Tail: 1,000' of open hole with 30% excess, plus 80' shoe track
Tail TOC: 2,449' MD 1,000' MD above shoe
Total Cement Volume: Spacer 75 bbls of Viscosified Spacer weighted to 10.10 ppg (Mud Push)
Lead 476 bbls, 2673 cuft, 602 sks 10.7 Ib/ al ASL G + adds - 4.44 cuft/sk
Tail 84 bbls, 472 cuft, 403 sks 15.8 Ib/ al Class G + adds -1.17 cuft/sk
Temp BHST --55° F. BHCT -60° F estimated by Schiumberger
In the event that cement is not circulated to surface during the initial surface casing cement job, notify the
AOGCC of the upcoming remedial cement work for possible witness of cement to surface.
Casing Size: ~ 7-5/8", 29.7-Ib/ft L-80 BTC-M / TC-II intermediate
Basis: Lead: None
Lead TOC: N/A
Tail: 2257' of open hole with 30% excess, plus 80' shoe track
Tail TOC: 4449' MD 827' MD above the Ma, 1000' MD below Surface Shoe
Total Cement Volume: Wash 20 bbls CW100
S acer 50 bbls of Viscosified S acer Mud ush Wei hted to 10.3
Tail 116 bbls, 651 cuft, 561 sks 15.8 Ib/ al G + Gasblok -1.16 cuft/sk
Temp BHST ~ 90° F at 4525 TVDss, from SOR
Centralizer Recommendations
10-3/a" Casing Centralizer Placement
a) Run (25) 10-3/4" Bow-spring centralizers attached over the collar of each joint of casing from the
casing shoe up to 1,000' MD above the shoe.
7 5/e" Casing Space Out
a) Spaceout the 7 8/e" casing to place a full joint in the window area of the OBb, OBa and OA sands.
b) Place 1 RA tag above each window exit. RA tags to be spaced out ~40 - 80' above window
depth except on the OBd lateral. The RA tag for the OBd lateral will need to be placed 1125'
above the casing shoe.
4 Permit to Drill 6-21-06
• •
Well Control ~So o Ir~6~--
Well control equipment consisting of 5,000 psi working pressure pipe ms (2), blind/shear rams, and annular
preventer will be installed and are capable of handling the maximu otential surface pressures. Based upon
calculations below, BOP equipment will be tested to psi.
BOP regular test frequency will be 14 days, with a function test every 7 days.
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Surface Hole
A diverter will be nippled up and function tested prior to drilling surface hole
Intermediate Section
• Maximum anticipated BHP: -2,010 psi -Schrader OBd (8.6 ppg C~ 4,525' TVDss)
• Maximum surface pressure: 1,558 psi -Based on a full column of gas @ 0.10 psi/ft
• Planned BOP test pressure:3SoQ-~;@66'psi/250 psi Rams
2,500 psi/250 psi Annular
• 10-3/4" Casing Test: 2,500 psi (K-55 casing burst is 3,580 psi)
• Integrity Test - 9-7/8" hole: LOT
• Kick Tolerance: 145 bbls with a 12.5 ppg EMW LOT , 8.6 ppg OBd
Production Section
• Maximum anticipated BHP: 2,010 psi - Schrader OBd (8.6 ppg @ 4,525' TVDss)
• Maximum surface pressure: ~ 1,558 psi -Based on a full column of gas C~3 0.10 psi/ft
• Planned BOP test pressure: 3500 x;896 psi/250 psi Rams
2,500 psi/250 psi Annular
• 7-5/8" Casing Test: 3,500 psi
• Integrity Test - 6-3/4" hole: FIT to 11.5ppg EMW for OBc lateral only
• Kick Tolerance: Infinite at OBc, OBd, OBb, OBa, and OA with an 11.5 ppg EMW FIT
• Planned completion fluid: 9.2 ppg SF OBM in Laterals, 9.2 ppg Brine, 6.8 ppg diesel in mother bore
Disposal
• No annular injection in this well.
• Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-
04. Any metal cuttings will be sent to the North Slope Borough.
• Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection.
Haul all Class I waste to Pad 3 for disposal.
5 Permit to Drill 6-21-06
• •
Drilling Hazards and Contingencies
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control
A. The Schrader in the target fault block is expected to be normal pressured at 8.3-8.6 ppg EMW. This
pressure is estimated based on offset well pressures and material balance.
11. Hydrates and Shallow gas
A. Gas Hydrates are expected at L-pad from the SV5 thru the SV1 sands below the base of the permafrost.
Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole.
Recommended practices and precautions for drilling hydrates should be followed in the surface hole.
Occasionally hydrates are encountered below the SV1.
III. Lost Circulation/Breathing
A. Lost circulation is not expected at fault #1. This fault has been penetrated by most wells drilled from L
Pad.
B. Breathing is not expected on this well.
IV. Kick Tolerance/Integrity Testing
Kick Tolerance / Inte ri Testin Summa Table
Casing set / Maximum Influx Volume Mud Weight Exp Pore Press Min LOT /FIT
Interval
Surface / 9 7/8" 145 9.3 8.6 OBd 12.5 LOT
Intermediate / 6-3/4" Infinite 9.3 8.6 (OBc) 11.5 (FIT for OBc
lateral onl
NOTE: All LOT /FIT will be taken with a minimum of 20-ft and a maximum of 50-ft of new hole
drilled outside of the previous casing string
An FIT will only be performed for the OBc lateral, not the OBd, OBb, OBa, or OA.
L-Pad development wells may have "kick tolerances" in the 25 bbl range. A heightened awareness
of kick detection, pre-job planning and trip tank calibration will be essential while drilling/tripping
the intermediate/production intervals.
V. Hydrogen Sulfide
L Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should
be followed at all times. No measurable H2S is being produced from the formation at this time. However 5 -
50 ppm is expected as a result of the use of Ivishak gas lift gas. All LV Pad gas lift wells will likely have H2S in
this concentration. Note that all injection has been with produced water not seawater. H2S levels are
expected to remain low until the waterflood matures. Recent H2S data from the pad is as follows:
Adjacent producers at Surface:
L-106 50 ppm
L-102 20 ppm
Adjacent producers at TD:
L-201 10 ppm
VI. Faults
A. Two faults are expected to be crossed in L-204. No losses are expected to be associated with these
faults. No faults are expected in the reservoir section, although sub seismic faults with throws <25' may
be encountered.
Fault Location MD TVDss Throw Direction Uncertainty
Fault #1 - L Pad 965' -880 -30' West +/- 100' MD
Fault
Fault #2 - Ugnu M 5,276' -3890' -145' West +/- 100' MD
Sand Interval
6 Permit to Drill 6-21-06
• •
CONSULT THE PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
L-204, L-204 L1, L-204 L2, L-204 L3 & L-204 L4
DRILL AND COMPLETE PROCEDURE SUMMARY
Pre-Rig Work:
1. A 34" x 20" insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC
Gen 5 Wellhead on the conductor.
2. If necessary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and
production simops.
Drilling Riq Operations:
1. MIRU Nabors 9ES. Nipple up diverter spool and riser. Function test diverter. PU 4" DP and stand back in
derrick.
2. MU 13-'h" drilling assembly with MWD/GR and directionally drill surface hole to approximately 3449' MD. The
actual surface hole TD will be +/-100' TVD below the top of the SV1 sand.
3. Run and cement the 10-3/a", 45.5#, K-55 BTC surface casing back to surface. ND drilling spool and riser and
NU casing /tubing head. NU BOPE and test to 5;60 psi. Son 1~~~"
4. MU 9-'/e" directional drilling assembly with MWD/GR/Res/Den/Neu/PWD and a Ghost reamer±1,000'and
±2,000' from the bit. RIH to float collar. Test the 10-3/a" casing to 2,500 psi for 30 minutes.
5. Drill out shoe track and displace the well to new 8.8 LSND drilling fluid. Drill 20' of new formation and perform
a LOT. Directionally drill ahead to TD at t 6706'. (f185' MD below Top OBd).
6. MU and run 7-5/e", 29.7#, L-80, BTC-M, TC-II casing to TD. Cement in one stage to 4,450' MD (1000' MD
from the surface casing shoe). Bump plug with seawater.
7. Clean pits for displacement. Freeze protect 7 5/8" x 10-3/a" annulus to 2,200' TVD.
•:• L-204 OBc Lateral
8. PU 6-3/a" conventional assembly with MWD/GR/Res/Den /Neu/AIM/PWD and RIH to the float collar. Test the
7 5/8" casing to 3,500 psi for 30 minutes.
9. Displace well over to 9.2 ppg Versapro MOBM. Drill out shoe track, circulate and condition mud. Drill 20' of
new formation and perform FIT to 11.5 ppg EMW.
10. Directionally drill ahead to TD geo-steering through the OBc to TD at -11981' MD. Back ream out of the hole
to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM.
11. POOH to near OBb window depth, log the top OBb (RA marker) with GR, log across the OBa and OA windows
as well. POOH.
12. MU and run 4-~h" 12.6# L-80 BTC-M slotted liner with swell packer and Aluminum billet liner top. Position billet
at 7,131'. POOH.
• L-204L1. OBd Lateral
13. RIH with 6-3/a" sidetracking /drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to AI billet. Displace well
over to 9.2 ppg Versapro MOBM. Time mill off billet to sidetrack. Directionally drill to the planned TD in the
OBd. Back ream out of hole to shoe, circulate and condition mud. RIH to TD and displace well bore to SF
MOBM. POOH.
14. MU and run 4-~/z" 12.6# L-80 BTC-M slotted liner with liner hanger and liner top packer. Position TOL for OBb
whipstock. POOH.
• L-204L2. OBb Lateral
15. PU the 7 6/8" whipstock assembly. Set the whipstock on the OBd liner top packer such that the top of the
window is near the top of the OBb sand. Orient and set whipstock. Shear off Whipstock. Displace well over to
9.2 ppg Versapro MOBM. Mill window. POOH.
16. RIH with 6-~/" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock.
Directionally drill to the planned TD of OBb lateral. Back ream out of hole to KOP, circulate and condition mud.
RIH to TD and displace well bore to SF MOBM. POOH.
17. Pull whipstock #1. Run and set 4-~/z" slotted liner and hook hanger. POOH and LD liner running string. Run
Baker Hook Hanger Lateral Entry Module #1 with ZXP liner top packer, POOH.
7 Permit to Drill 6-21-06
• L-204L3. OBa Lateral
18. PU the 7 6/8' whipstock assembly. Set the whipstock on the OBb liner top packer such that the top of the
window is near the top of the OBa sand. Orient and set whipstock. Shear off Whipstock. Displace well over to
9.2 ppg Versapro MOBM. Mill window. POOH.
19. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock.
Directionally drill to the planned TD of the OBa lateral. Back ream out of hole to KOP, circulate and condition
mud. RIH to TD and displace well bore to SF MOBM. POOH.
20. Pull whipstock #2. Run and set 4-~h" slotted liner and hook hanger, POOH and LD liner running string. Run
Baker Hook Hanger Lateral Entry Module #2 with ZXP liner top packer, POOH.
• L-204L4, OA Lateral
21. PU the 7-6/e" whipstock assembly. Set the whipstock on the OBa liner top packer such that the top of the
window is near the top of the OA sand. Orient and set whipstock. Shear off of Whipstock. Displace well over
to 9.2 ppg Versapro MOBM. Mill window. POOH.
22. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock.
Directionally drill to the planned TD of the OA lateral. Back ream out of hole to KOP, circulate and condition
mud. RIH to TD and displace well bore to SF MOBM. POOH.
23. Pull whipstock #3. Run 4-'/z" slotted liner and hook hanger, POOH and LD liner running string. Run Baker
Hook Hanger Lateral Entry Module #3 with ZXP liner top packer. Clean pits for displacement. Displace mother
bore over to 9.2 ppg KCL brine. POOH.
24. MU 4-'/z" 12.6# IBT-M, L-80 completion assembly and RIH. See completion schematic for details. Land tubing
hanger and run in lockdown screws.
25. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus
to 3,500 psi. Shear DCK valve.
26. Install two-way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test the tree to
5,000 psi.
27. Pull two-way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze protect the well
to 2,200' TVD. Install VR plug in 7-5/e" casing annulus valves.
28. Install BPV. Secure the well and rig down /move off Nabors 9ES.
Post-Riq Work:
1. MIRU slickline. Pull the ball and rod /RHC plug.
2. Pull out DCK shear valve, install GLV in all of the other mandrels as per the PE.
8 Permit to Drill 6-21-06
~ ~
Variance Request
Issue
Compliance with AOGCC testing requirements for BOP rams after they have been used in the
normal coarse of operations.
Re uest
The AOGCC is in the process of developing a guideline document clarifing the intent of the
regulations pertaining to function pressure testing ram type BOP's.
BPXA requests a variance to the provisions of 20 AAC 25.035 (e}(10)C regarding the function
pressure test requirement after the use of BOP ram type equipment for other than well control
or equivalent purposes, except when the routine use of BOP ram type equipment may have
compromised their effectiveness. (Example would be when pipe rams are inadvertently closed
on a tool joint during routine operations.} The activities associated with this request will not
compromise the integrity of the BOP equipment.
Background
AOGCC regulations require rams that have been used in the course of primary drilling &
completion, workover and through tubing drilling operations be #unction pressure tested before
the next wellbore entry. This is not a new regulation. The intent of this regulation is to ensure
that ram type equipment has integrity after it has been utilized in a wellbore...for example; to
ensure integrity if a ram was closed on a tool joint. The exact regulation language is:
"if BOP sea{ing ram type equipment has been used, it must be function pressure-tested, before
the next wellbore entry, to the required working pressure specified in the approved Permit to
Drill, using anon-compressible fluid, except that an annular type preventer need not be tested
to more than 50 percent of its rated working pressure;"
The pertinent sections are: 20 AAC 25.035 (e)(10)C PRIMARY DRILLING AND
COMPLETION; 20 AAC 25.036 (d}(4} THROUGH TUBING DRILLING AND COMPLETION;
20 AAC 25.285 {f)(2) TUBING WORKOVERS: 20 AAC 25.286(e)(1) WORKSTRING
SERVICE OPERATIONS
This issue has been discussed with Winton Aubert at the AOGCC. The test requirement in the
regulation is intended to apply to ram type equipment only. The AOGCC understands that ram
type BOP's are utilized for purposes other than well control in the normal coarse of operations.
The regulations allowing a variance are at 20 AAC 25.035(h) PRIMARY DRILLING AND
COMPLETION; 20 AAC 25.036(f) THROUGH TUBING DRILLING AND COMPLETION; 20
AAC 25.285(h) TUBING WORKOVERS; 20 AAC 25.286(8) WORKSTRING SERVICE
OPERATIONS...which says generally:
20 AAC 25.035(h)... Upon request of the operator, the commission will, in its discretion,
approve a variance
(1) from the BOPE requirements in (e) of this section if the variance provides at least an
equally effective means of welt control;
L-204, L1, L2, L3, & L4 PROPOSED COMPLETION
Phoenix
Pressure
Gauge
with control
lines to surface
RA Tag TBD
20" X 34" 215.5 Ib/ft, A53 ERW Insulated @ 109'
Halliburton X-Nipple (3.813" ID) @ 2200' TVD
4-112", 12.6 Ib/ft, L-80, BTC-M
Coupling OD: 5.2"
Drift/ID : 3.833"/3.958"
10-3/4", 45.5# K-55 BTC Csg @ 3,449' MD
TREE: FMC 4-1/16" 5M
WELLHEAD: FMC Gen 5 System
11", 5M csg.head w/ 7" mandrel hanger 8 packoff
11" x 11", 5M, tbg spool w/
11" x 4-1/2" tubing hanger with control line ports
11" X 4-1/16" Adaptor Flange
Orig KB elev (N-9ES) _ '
4.5" Baker sliding sleeve with 3.813" ID @
GLM Design:
7-518" X 5-1l2" Baker PRM Packer @ #4 -TBD' TVD - 4-1/2" X 1" KBG-2 - SV
#3 -TBD' TVD - 4-1/2" X 1" KBG-2 - DV
Halliburton X-Nipples (3.813" ID) #2 - 4 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV
- 4.5" WLEG @ 5,800' MD #1 - 2 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV
Versapro SFMOBM in each Lateral and in mother bore from tbg tail down.
Junction Snecificatlons: /
Junction ID through LEM
Module without diverter: 3.68" RA Tag TBD
LEM run with internal sealbores
to allow the use of isolation
sleeve across window.
Baker Hughes Hookwall Hanger
Window in 7-5I8" casing
Well Inclination @ Window = °
(Baker Hughes Hookwall Hanger
W ndow in 7-5/8" casing
Well Inclination @ Window =
(Baker Hughes Hookwall Hanger
Window in 7-5/8" casing
Well Inclination @ Window
6314" OA Lateral 5,876'-11,921'
T: ~ ~ - ------ 'w,
Swell packer placement TBD
6.314" Oea Lateral 6,017'-11,947`
Swell packer placement ITy,B,Dr
RA Tag
RA Tag TBD
29.7#, L-80, BTC-M @ 6706
Casing Drift: 6.75"
Casing ID: 6.875"
Solid Liner
\ 7,131'- 11,981'
- _.. ,. 1?
- - - - - -
placement TBD
Swel Aluminum ~ OBc Lateral
~ Billet ~ °°
_
,, ~ ` ..
2-~'
,-. n."„~
It
~~
6-314" OBd Lateral 6706'- 11,976'
DATE REV. BY COMMENTS
~
f
'
"P
f
' B
'
5!31/2006 sRK Level 3 Mu1tFLateral, 4-t/2° GL Completion Ot
ay
~
[
III[I
E
!
API NO: 50-029-
5o-ozs-
ORION
50-029-
WELL: L-204 ML
50-029-
6-314" OBb Lateral 6,122'-11,961'
~ PLANT
- N~is•ee•ee°
GRID
I
I
I
I
I
I
I
I
I
I
I
I
1
i
i
- -- ----------- -------------
i
L-PAD
I
I
I
i
~
^ N-L
(NWE-1)
i
I
I
~~ a~
I
L-1111 ^ S
~ N-A (NWE-2)
^
I ^ L-2181
I L-114 ^ ^ L-124
I L-50 ^ ~ L-1121
~ L-02
~
~ L-121 ^ ^ L-1231
~ ^ L-122
~ L-110 ^ ^ L-2111
L-SI ^ ^ L-115f
L-116 ^ ^ L-117
~ L-109 ^ ^ L-118
l-SL ^
^ L-250
L-01 ^ ^ L-200
L-107 ^ ^ L-202
L-03 ^ ~`~0 5B3 ^ L-2121
i
I
I
1
r -'
I
I
I
i
1
i
i
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
J/
~ ^ L-SPARE
L-2131 ^ ^ L-203
L-1081 ^ ~` ^ L-2161 ~
L-1051^ ~ ^ L-1031 ~
L-106 ~ ^ L-2151 ~
L-204 ~ ^ L-201 I
L-104 ^ ^ L-1191
1-214i^ ^ L-210i I
L-102 ^ ^=
~"
6 ^ L-120
I
I
I
I
I
I
I
sKio s.s
sao su i
~
/~//
34 ~35
_~
L-PAD ~
PROJECT T12N
AREA
T11N
w
3 2
;~
VICINITY MAP
N.T.S.
YrGLL IV V. L-LIIJY RGVIJI VIV IVV IC
THIS AS-BUILT DRAWING IS A RE-ISSUE OF
A PREVIOUS CONDUCTOR AS-BUILT FOR WELL
L-1231 DATED 8/29/2004. WELL L-1231 WAS
RENAMED AS SLOT L-SU ON 12/11/2005 AND
IS NOW BEING RENAMED TO WELL L-204.
~E A~
~°°° °°q
~P°°°°°° °°S~r-
°°°°°°°°°°°°°°°°°°~°°°°°°o°°°°°
'~,°°° Leonard J. OHanley
~° 11386
"'"T'tSSI0PIA~- `J'~
SURVEYOR'S CERTIFICATE.
] HEREBY CERTIFY THAT 1 AM
PROPERLY REGISTERED AND LICENSED
TO PRACTICE LAND SURVEYING IN
THE STATE OF ALASKA AND THAT
THIS PLAT REPRESENTS A SURVEY
MADE BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT ALL
DIMENSIONS AND OTHER DETAILS ARE
CORRECT AS OF AUGUST 26, 2004
LEGEND NOTE
RENAMED CONDUCTOR 1. DATE OF SURVEY: AUGUST 26-27, 2004.
2. REFERENCE FIELD BOOK: W004-11 PAGES 54-59.
^ EXISTING CONDUCTOR 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27.
GEODETIC POSITIONS ARE NAD 27.
4. BASIS OF HORIZONTAL LOCATION IS OPERATOR MONUMENTS,
WOA L-PAD MONUMENTATION.
5. BASIS OF ELEVATION IS OPERATOR MONUMENTS PER F.R. BELL
& ASSOCIATES. ELEVATIONS ARE BPX MEAN SEA LEVEL DATUM.
6. MEAN PAD SCALE FACTOR IS 0.999907827.
LOCATED WITHIN PROTRACTED SEC. 34, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA
WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION
N0. COORDINATES COORDINATE POSITION DMS POSITION D.DD BOX ELEV. OFFSETS
L-204 = 5,978,146.73 N 9,819.88 70'21'00.936" 70.3502600'
50
1' 2,423' FSL
'
= 583,371.74 E 5,339.90 149'19'23.212" 149.3231144' ' 3,544
FEL
by
L`1t~JL1~ ~ees'wa 11-e2 WOA L-PAD
y~(~(~~ JOB NO:
llJ~lJlbo ~, CONDUCTOR AS-BUILT
°"'m° "°'"° """'°" WELL L-204
w m r,e~m we 1~~ 150'
SNEET:
1 of 1
by
®~`~ Schlumberger
~-204L3 (P2) Proposal
Report Date: May 10, 2006 Survey 1 DLS Computation Method: Minimum Curvature / Lubinskl
Client: BP Exploration Alaska Vertical Section Azimuth: 104.910°
Field:
Structure 1 Slot: Prudhoe Bay Unit - WOA
L-PAD / S-U ~~ Vertical Section Origin: S 0.003 ft, W 0.001 ft
~~ TVD Reference Datum: Rotary Table
Well: Plan L-204 (S-U)
~I~~ TVD Reference Elevation: 78.60 ft relative to MSL
Borehole: ~~~
Plan L-204L3 OBa ~~~ Sea Bed 1 Ground Level Elevation: 50.10 ft relative to MSL
UWIIAPI#: 50029 Magnetic Declination: 24.153°
Survey Name 1 Date: L-204L3 (P2) /May 10, 2006 Total Field Strength: 57579.601 nT
Tort 1 AHD 1 DDI 1 ERD ratio: 208.668° 19567.07 ft / 6.715 / 2.083 Magnetic Dip: 80.859°
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feel Declination Date: July 30, 2006
Location LatlLong: N 70.35026009, W 149.32311435 Magnetic Declination Model: BGGM 2005
Location Grid NIE YIX: N 5978146.730 ftUS, E 583371.740 ftUS North Reference: True North
Grid Convergence Angle: +0.63747117° Total Corr Mag North -> True North: +24.153°
Grid Scale factor: 0.99990790 Local Coordinates Referenced To: Well Head
•
Measured Vertical
Comments Inclination Azimuth Sub•Sea TVD TVD NS EW DLS Tool Face Build Rate Walk Rate Northing Easting Latitude Longitude
Depth Section
k d d ft ft ft ft ft d 100 ft de de 100 ft de 100 ft ftUS ftUS
IOp WI11PStOCK bUl b.tiU 5y.55 y/.5tl 4:S4y.yy 44L23.5y JbVb.Vy -4bb.4L :SbV /.54
Base Whipstock 6029.60 61.63 97.58 4356.37 4434.97 3617.32 -467.91 3618.76
KOP Bld 10/100 6041.60 61.63 97.58 4362.07 4440.67 3627.79 -469.31 3629.23
6050.00 62.47 97.60 4366.01 4444.61 3635.15 -470.29 3636.58
6100.00 67.47 97.68 4387.16 4465.76 3680.08 -476.31 3681.47
6150.00 72.47 97.76 4404.29 4482.89 3726.67 -482.61 3728.01
6200.00 77.47 97.83 4417.25 4495.85 3774.57 -489.16 3775.83
6250.00 82.46 97.90 4425.96 4504.56 3823.41 -495.89 3824.59
6300.00 87.46 97.97 4430.35 4508.95 3872.84 -502.76 3873.90
Crv 10/100 6325.36 90.00 98.00 4430.91 4509.51 3898.00 -506.28 3899.01
6350.00 92.45 98.25 4430.38 4508.98 3922.46 -509.77 3923.40
6400.00 97.43 98.75 4426.08 4504.68 3971.95 -517.12 3972.65
End Crv 6423.78 99.79 98.99 4422.52 4501.12 3995.33 -520.75 3995.87
Crv 10/100 6570.53 99.79 98.99 4397.56 4476.16 4139.17 -543.36 4138.71
6600.00 97.84 101.23 4393.04 4471.64 4168.19 -548.48 4167.38
6650.00 94.52 104.99 4387.66 4466.26 4217.86 -559.75 4215.77
6700.00 91.17 108.71 4385.18 4463.78 4267.75 -574.22 4263.55
L-204L3 OBa Tgt 1 6717.43 90.00 110.00 4385.00 4463.60 4285.13 -580.00 4280.00
End Crv 6736.86 88.38 111.08 4385.27 4463.87 4304.46 -586.81 4298.19
Crv 10/100 7392.49 88.38 111.08 4403.76 4482.36 4956.04 -822.51 4909.71
7400.00 87.80 110.61 4404.01 4482.61 4963.50 -825.18 4916.72
L-204L3 OBa Tgt 2 7419.24 86.30 109.40 4405.00 4483.60 4982.64 -831.76 4934.78
7450.00 83.91 107.46 4407.63 4486.23 5013.23 -841.45 4963.85
4.UV V.VVIi
16.00 O.OOG
0.00 0.88G
10.00 0.87G
10.00 0.84G
10.00 0.81G
10.00 0.79G
10.00 0.78G
10.00 0.77G
10.00 5.74G
10.00 5.75G
10.00 5.79G
10.00 O.OOG
0.00 131.17G
10.00 131.51G
10.00 131.92G
10.00 132.10G
10.00 146.29G
10.00 O.OOG
0.00 -141.22G
10.00 -141.21G
10.00 -141.14G
10.00 -140.98G
S.ytS V.SI 5y///LU.SL 525byiSS.yl N /U.S4C`Ji5J5V VV l4y.Ly3tS.SUSU
16.00 0.00 5977719.15 586995.14 N 70.34897941 W 149.29373939
0.00 0.00 5977717.87 587005.62 N 70.34897559 W 149.29365444
10.00 0.17 5977716.97 587012.99 N 70.34897290 W 149.29359474
10.00 0.16 5977711.45 587057.94 N 70.34895639 W 149.29323040
10.00 0.15 5977705.66 587104.53 N 70.34893910 W 149.29285269
10.00 0.14 5977699.65 587152.43 N 70.34892115 W 149.29246448
10.00 0.14 5977693.46 587201.25 N 70.34890269 W 149.29206873
10.00 0.14 5977687.14 587250.63 N 70.34888385 W 149.29166846
10.00 0.13 5977683.90 587275.77 N 70.34887420 W 149.29146470
9.95 1.00 5977680.69 587300.20 N 70.34886465 W 149.29126675
9.95 1.01 5977673.88 587349.52 N 70.34884448 W 149.29 9
9.95 1.02 5977670.51 587372.78 N 70.34883454 W 149.29 7
0.00 0.00 5977649.50 587515.85 N 70.34877256 W 149.2895 914
-6.61 7.60 5977644.70 587544.57 N 70.34875854 W 149.28928645
-6.66 7.51 5977633.96 587593.08 N 70.34872766 W 149.28889365
-6.69 7.44 5977620.03 587641.02 N 70.34868806 W 149.28850588
-6.71 7.42 5977614.43 587657.52 N 70.34867225 W 149.28837239
-8.32 5.55 5977607.82 587675.78 N 70.34865360 W 149.28822480
0.00 0.00 5977378.96 588289.83 N 70.34800867 W 149.28326216
-7.80 -6.27 5977376.37 588296.87 N 70.34800136 W 149.28320526
-7.79 -6.28 5977370.00 588315.00 N 70.34798337 W 149.28305874
-7.78 -6.31 5977360.64 588344.17 N 70.34795685 W 149.28282282
WeIlDesign Ver SP 1.0 Bld( doc40x_56) S-U\Plan L-204 (S-U)\Plan L-204L3 OBa\L-204L3 (P2) Generated 5/10/2006 1:00 PM Page 1 of 2
Measured Vertical
Comments Inclination Azimuth Sub-Sea TVD TVD NS EW DLS Tool Face Build Rate Walk Rate Northing Easting Latitude Longitude
Depth Section
ft de d ft ft ft ft ft de 100 ft de d 100 ft de 100 ft ftUS ftUS
tno l;rV /45b./4 t53.32f 1U/.U:S 44Ut3..S/ 44t3b.y/ 5U19.92 -2f4:i.4:i 49/U.25 IU.UU U.UU(i -/.// -(1.34 59//;158./2 588S5U.FiU N lU.34/95141 W 149.28277087
Crv 10/100 7595.92 83.38 107.03 4424.41 4503.01 5158.08 -883.93 5102.44 0.00 64.60G 0.00 0.00 5977319.70 588483.22 N 70.34784054 W 149.28169812
7600.00 83.56 107.40 4424.87 4503.47 5162.13 -885.13 5106.31 10.00 64.56G 4.29 9.09 5977318.55 588487.10 N 70.34783725 W 149.28166673
7650.00 85.72 111.93 4429.54 4508.14 5211.72 -901.88 5153.17 10.00 64.14G 4.33 9.05 5977302.32 588534.14 N 70.34779140 W 149.28128645
L-204L3 OBa Tgt 3 7656.32 86.00 112.50 4430.00 4508.60 5217.98 -904.26 5159.00 10.00 65.99G 4.37 9.02 5977300.00 588540.00 N 70.34778488 W 149.28123908
7700.00 87.79 116.49 4432.37 4510.97 5260.97 -922.34 5198.68 10.00 65.77G 4.09 9.14 5977282.36 588579.87 N 70.34773541 W 149.28091712
End Crv 7714.83 88.40 117.85 4432.86 4511.46 5275.45 -929.11 5211.87 10.00 O.OOG 4.11 9.12 5977275.74 588593.13 N 70.34771690 W 149.28081012
Crv 10/100 8261.72 88.40 117.85 4448.18 4526.78 5808.25 -1184.45 5695.24 0.00 -83.OOG 0.00 0.00 5977025.82 589079.27 N 70.34701837 W 149.27688821
8300.00 88.86 114.04 4449.10 4527.70 5845.81 -1201.19 5729.65 10.00 -82.91 G 1.23 -9.93 5977009.47 589113.86 N 70.34697256 W 149.27660902
8350.00 89.49 109.08 4449.82 4528.42 5895.45 -1219.56 5776.13 10.00 -82.84G 1.24 -9.92 5976991.62 589160.54 N 70.34692228 W 149.27623187
L-204L3 OBa Tgt 4 8391.15 90.00 105.00 4450.00 4528.60 5936.56 -1231.62 5815.47 10.00 -82.89G 1.25 -9.92 5976980.00 589200.00 N 70.34688927 W 149.27 0
8400.00 90.11 104.12 4449.99 4528.59 5945.42 -1233.84 5824.03 10.00 -82.89G 1.24 -9.92 5976977.87 589208.59 N 70.34688317 W 149.277
End Crv 8438.68 90.59 100.28 4449.76 4528.36 5984.05 -1242.02 5861.83 10.00 O.OOG 1.24 -9.92 5976970.12 589246.48 N 70.34686076 W 149.27553642
Crv 10/100 8890.18 90.59 100.28 4445.12 4523.72 6434.05 -1322.61 6306.05 0.00 104.23G 0.00 0.00 5976894.48 589691.52 N 70.34663960 W 149.27193144
8900.00 90.35 101.24 4445.04 4523.64 6443.84 -1324.44 6315.70 10.00 104.24G -2.46 9.69 5976892.75 589701.19 N 70.34663457 W 149.27185313
L-204L3 OBa Tgt 5 8914.08 90.00 102.60 4445.00 4523.60 6457.90 -1327.35 6329.48 10.00 104.11 G -2.46 9.69 5976890.00 589715.00 N 70.34662659 W 149.27174132
8950.00 89.13 106.08 4445.27 4523.87 6493.81 -1336.25 6364.27 10.00 104.08G -2.44 9.70 5976881.49 589749.89 N 70.34660221 W 149.27145899
End Crv 8988.64 88.19 109.53 4446.18 4524.78 6532.38 -1348.15 6401.01 10.00 O.OOG -2.43 9.70 5976870.00 589786.75 N 70.34656960 W 149.27116089
Crv 10/100 9799.60 88.19 109.83 4471.83 4550.43 7339.95 -1623.16 7163.49 0.00 110.61G 0.00 0.00 5976603.51 590552.17 N 70.34581641 W 149.26497438
9800.00 88.17 109.87 4471.84 4550.44 7340.34 -1623.30 7163.87 10.00 110.61 G -3.52 9.36 5976603.38 590552.55 N 70.34581605 W 149.26497137
9850.00 86.42 114.56 4474.20 4552.80 7389.87 -1642.17 7210.09 10.00 110.38G -3.50 9.38 5976585.02 590598.97 N 70.34576436 W 149.26459636
L-204L3 OBa Tgt 6 9862.15 86.00 115.70 4475.00 4553.60 7401.79 -1647.32 7221.06 10.00 111.40G -3.48 9.40 5976580.00 590610.00 N 70.34575027 W 149.26450736
9900.00 84.63 119.24 4478.09 4556.69 7438.61 -1664.72 7254.53 10.00 111.12G -3.63 9.35 5976562.98 590643.66 N 70.34570265 W 149.26423586
End Crv 9938.16 83.26 122.82 4482.12 4560.72 7475.06 -1684.28 7287.04 10.00 O.OOG -3.57 9.39 5976543.78 590676.38 N 70.34564913 W 149.26397214
Crv 10/100 10066.77 83.26 122.82 4497.21 4575.81 7596.59 -1753.51 7394.37 0.00 -19.82G 0.00 0.00 5976475.76 590784.46 N 70.34545971 W 149.26310161
L-204L3 OBa Tgt 7 10096.91 86.10 121.80 4500.00 4578.60 7625.23 -1769.55 7419.73 10.00 -21.98G 9.41 -3.40 5976460.00 590810.00 N 70.34541582 W 149.26289590
10100.00 86.39 121.68 4500.20 4578.80 7628.18 -1771.17 7422.35 10.00 -21.97G 9.27 -3.75 5976458.41 590812.64 N 70.34541139 W 149.26287464
End Crv 10131.69 89.33 120.50 4501.39 4579.99 7658.59 -1787.52 7449.47 10.00 O.OOG 9.28 -3.74 5976442.36 590839.93 N 70.34536664 W 149.26265469
Crv 10/100 10857.76 89.33 120.50 4509.93 4588.53 8357.90 -2155.99 8075.03 0.00 -55.99G 0.00 0.00 5976080.91 591469.50 N 70.34435825 W 149.257 6
L-204L3 OBa Tgt 8 10869.81 90.00 119.50 4510.00 4588.60 8369.53 -2162.02 8085.47 10.00 -58.75G 5.59 -8.29 5976075.00 591480.00 N 70.34434176 W 149.252
10900.00 91.57 116.92 4509.59 4588.19 8398.91 -2176.28 8112.07 10.00 -58.79G 5.19 -8.55 5976061.03 591506.75 N 70.34430270 W 149.25 48
End Crv 10920.89 92.65 115.13 4508.82 4587.42 8419.39 -2185.44 8130.83 10.00 O.OOG 5.18 -8.56 5976052.08 591525.61 N 70.34427762 W 149.25712831
Crv 10/100 11059.35 92.65 115.13 4502.42 4581.02 8555.51 -2244.18 8256.05 0.00 -104.50G 0.00 0.00 5975994.75 591651.47 N 70.34411679 W 149.25611262
11100.00 91.62 111.19 4500.91 4579.51 8595.70 -2260.15 8293.39 10.00 -104.64G -2.52 -9.69 5975979.19 591688.98 N 70.34407304 W 149.25580973
11150.00 90.36 106.36 4500.04 4578.64 8645.56 -2276.24 8340.71 10.00 -104.73G -2.54 -9.67 5975963.64 591736.47 N 70.34402895 W 149.25542587
L-204L3 OBa Tgt 9 11164.01 90.00 105.00 4500.00 4578.60 8659.58 -2280.02 8354.20 10.00 -105.15G -2.54 -9.67 5975960.00 591750.00 N 70.34401857 W 149.25531641
11200.00 89.06 101.53 4500.30 4578.90 8695.54 -2288.28 8389.22 10.00 -105.13G -2.61 -9.65 5975952.14 591785.11 N 70.34399591 W 149.25503229
End Crv 11207.24 88.87 100.83 4500.43 4579.03 8702.76 -2289.68 8396.32 10.00 O.OOG -2.61 -9.66 5975950.81 591792.22 N 70.34399206 W 149.25497467
TD /4-1/2" Lnr 11~46.~0 88.87 100.E3 4515.00 4593.60 X440.40 -2428.60 9122.67 0.00 O.OOG 0.00 0.00 5975820.00 592520.00 N 70.34361024 W 149.24908144
WeIlDesign Ver SP 1.0 Bld( doc40x_56) S-U\Plan L-204 (S-U)\Plan L-204L3 OBa\L-204L3 (P2) Generated 5/10/2006 1:00 PM Page 2 of 2
by
Schlumberger
wEU
L-204L3 (P2) FIELD
Prudhoe Bay Unit - WOA sruur:ruRE
L-PAD
Mai}-UC Peramulas air NAUlI A4nka ~~ain Pie~.n. Zrxi~ OE US Feat
L~ MrscNlanwws
MWeI RG(:M 2005 Up'. &1959' Dale Jdy 30.ZW6 N)02109J6 NulNniy. S9IB146 /JM1US rM G1YIV. v0.till4
Lan Sfly. SU NU Rd Rulary TaMnlI9 to It dwvn MSLI
May Ua~: •24.153' f5. 5]S/96nT W149192J.212 Eadriy SB3J/t I4 tlUS SuMFa]. O: }y0)996 Plan. L~204LJ1P2l Srvy Uda May 10. 2000
4000 4800 5600 6400 7200 8000 8800 9600 •
4000
O
O
C
y 4800
U
5600
Top Whipstock
Base Whip$tock
..;..
. ...; .. ... L...
KOP Bld 10/100 ~ L-204L3 OBa T t p
04 (P3) O c L-204L3 OBa Tgt 1 ~-204(.3 OBa Tgt 4 End Crv -
Crv 161700 ~ End Crv L-204L3 066 7gt 6
End Crv Crv 10j100 Crv 101100 '
Crv tUI100 End Crv L-204E3 OBa Tgt 8 TD 14112" Lnr
Cev 101100 End Crv
Crv 10l~00 ~ -204 3 P2
~Bc
nd Crv :Crv 10/100 End Crv ~ Crv 10/100: End Crv L2~(~.P~P
..................................:...................................................................:...................................:.................................:................. ~ ........................ 1.1x.......
.............;....................... ............ Q4 t
L-204L3 Oea Tgt 5 Crv 10!100 End Crv Crv 10/100
7.518" Cs PtL-204L3 OBa Tgt 3 L~04L3 OBa T t 7 End Crv
g 9 L-204L3 OBa Tgt 9
4000
4800
5600
4000 4800 5600 6400 7200 8000 8800 9600
Vertical Section (ft) Azim = 104.91 °, Scale = 1(in):800(ft) Origin = -0.00285079 N/-S, -0.000856544 E/-V
by
Schlumberger
WILL L-204L3 (P2) GlbLO Prudhoe Bay Unit - WOA STRUCTURE L-PAD
Magna4c Parsmnlars Surlaw L+wtiun NAUL/AIa~Fn Slete Vlanus. l..ne Od, //Steal M¢~allanwus
MoGW. BGGM 2W5 UiV: 90.66y' Uale. NV J0. 2006 lal NIU 210 yJ6 Nurlliu~y 5ylR196.1JIIUS Grit CUnv .. SIM 5-U iVU RaI: Rotary Table l]B 60X aWVe MSLI
May Uec: ~24.15J' GS 15/96 nT W14y 19lJ.21% l.a~ariy: .itlJJl1.10 IIUS ti~:+N Fe~tU: JJJ!i(1]9yti Plan: L-204L3 ~P2) rvY Oale: MaV 1U. 200fi
0
A
n
Z -800
O
O
C
N
~ -1600
V
V
V
-2400
3200 4000 4800 5600 6400 7200 8000 8800
..i .............. Top WhipstocM ................................... ;...................................i.................................. i.................................. j.................................. o .................................. r.............................
Base Whipstock of
KOP Bld 10/100
Cry 10/100 j
End Crv
7.5/8" Csg Pt
_ ~
Crv 10/100
Crv 104100 L-204L3 OBa fgt 3
........................LZM4,3.QBa.781.1....................... ............... pA.Cxv..:..................................:..................................:.................................._..................................:.............................
End Crv
Crv 10/100:
L-204L3 OBa Tgt 2 Crv j0I100
End Crv 1:204L3 OBa Tgt 5
End Crv
Crv 10/100 :Crv 101100
L-204L3 OBa Tgt 4
L•204L3 OBa 7gt 6
Entl Crv End Crv
..:..................................5......................................................................,............................... .................... ............. .............................. .......................
crv lolioo
L-204L3 OBa7gt 7 Crv 10/100
L-204L3 OBa Tgt 8
End Crv End Crv
TD 14-1/2" Lnr
Crv t0/100 L-204 (P3) O c
../ ..................................j..................................p..................................y..................................1..................................~...................................~............ .. .................i.. .. ...............
L-204L3iOBa Tgt 9 L-204L7 (P
End Cn L-204L2 (P2
L-204L3 (P2)
3200 4000
4800 5600 6400 7200 8000 8800
«< W Scale = 1(in):800(ft) E »>
0
-800
-1600
-2400
11
•I
BP Alaska
Anticollision Report
Company: BP Amoco Date: 5/40!2006 Time: 13:12:45 Page: 1
Field: Prudhoe Bay'
Reference Site: PB L Pad Co-ordinate(NE) Reference: Well: Plan L-204 (S-U), True North ~
Reference Well: Plan L-204 (S-lJ) Vertical (TVD) Reference: L-204 Plan S-U 78.6 i
Reference Wellpatbs Plan L-204L3 OBa Db: Oracle
', NO GLOBAL SCAN: Using user defined selection & scan criteria Reference: Principal Plan & PLANNED PROGRAM
Interpolation Method: MD + Stations Interval: 5.00 ft Error Model: ISCWSA Ellipse
', Depth Range: 6016.60 to 11946.90 ft Scan Method: Trav Cylinder North
Maximum Radius:10000.00 ft Error Surface: Ellipse + Casing
', Survey Program for Definitive Wellpath ',
Date: 5/8/2006 Validated: No Version: 1
Planned From To Survey Toolcode Tool N ame ',
~i ft ft
--- --
', 28.50 700.00 Planned: Plan #3 V1 (0)
700.00 6016.60 Planned: Plan #3 V1 (0)
6016.60
I _ _ _ 11946.90
_ Planned: Plan #2 V1
_____- -- -- - -
-----
Casing Points
-
- -
-
MD TVD Diameter Hole Size Name
ft ff ° in in
', 3223.42 2648.60 10.750 13.500 10 3/4"
6016.60 4428.59 7.625 9.875 7-5/8"
11946.90 4593.60 4.500 6.750 4 1 /2"
Summary
- -_ - -
-
<~_s~._~.r__ Offset Wellpath - -
-- ----> -
Site Well Wellpath
PB L Pad L-01 L-01 V14 6
PB L Pad L-02 L-02 V1
', PB L Pad L-02 L-02A V5
'~ PB L Pad L-02 L-02APB1 V2
~, PB L Pad L-02 L-02P61 V21
PB L Pad L-03 L-03 V5 6
PB L Pad L-101 L-101 V4
', PB L Pad L-102 L-102 V2 6
~ ' PB L Pad L-102 L-102P61 V10
', PB L Pad L-102 L-102P62 V2
PB L Pad L-103 L-103 V23 6
', PB L Pad L-104 L-104 V7 6
PB L Pad L-105 L-105 V4 6
PB L Pad L-106 L-106 V14
PB L Pad L-107 L-107 V14 6
PB L Pad L-108 L-108 V18 6
PB L Pad L-109 L-109 V12
PB L Pad L-110 L-110 V11
PB L Pad L-111 L-111 V24
!, PB L Pad L-112 L-112 V8
PB L Pad L-114 L-114 V15
PB L Pad L-114 L-114A V4
~~ PB L Pad L-115 L-115 V7
~, PB L Pad L-116 L-116 V10
', PB L Pad L-117 L-117 V11
', PB L Pad L-118 L-118 V9
PB L Pad L-119 L-119 V9 6
', PB L Pad L-120 L-120 V8 6
', PB L Pad L-121 L-121 V14
PB L Pad L-121 L-121A V1
~ PB L Pad L-122 L-122 V5
PB L Pad L-123 L-123 V5
PB L Pad L-123 L-123P61 V3
I~ PB L Pad L-124 L-124 V13
i PB L Pad L-124 L-124PB1 V5
PB L Pad L-124 L-124P62 V4
PB L Pad L-200 L-200 V7
PB L Pad L-200 L-200L1 V3
PB L Pad L-200 L-200L2 V6
PB L Pad L-201 L-201 V6 10
PB L Pad L-201 L-201L1 V9 10
GYD-GC-SS Gyrodata gyro single shots
MWD+IFR+MS MWD +IFR + Multi Station
MWD+IFR+MS MWD +IFR + Multi Station
eference Offset Ctr-Ctr No-Go .allowable
MD MD Distance Area...: Deviation Warning,
ft ft ft ft: ft
J
016.60 9105.00 5175.61 76.70 5098.90 Pass: Major Risk
Out of range
Out of range i
Out of range !~
Out of range
017.46 6370.00 190.57 75.93 114.64 Pass: Major Risk
Out of range
600.00 6420.00 796.94 192.28 604.66 Pass: Major Risk
Out of range
Out of range
017.09 6590.00 1662.85 173.11 1489.74 Pass: Major Risk
771.70 6840.00 221.31 17.92 203.39 Pass: Minor 1/200
017.56 6410.00 1038.34 72.30 966.04 Pass: Major Risk
Out of range
016.60 6880.00 2579.23 177.97 2401.26 Pass: Major Risk
016.60 7870.00 3779.42 141.61 3637.81 Pass: Major Risk
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
016.60 8520.00 5061.45 149.99 4911.45 Pass: Major Risk ',
018.22 6575.00 2180.27 171.77 2008.50 Pass: Major Risk
Out of range
Out of range
Out of range ',
Out of range
Out of range
Out of range ',
Out of range ',
Out of range
Out of range ',
Out of range ',
Out of range ', i
299.78 13645.00 1125.91 269.48 856.43 Pass: Major Risk
277.92 13540.00 1027.99 282.28 745.71 R
Pass: Major Risk
BP Alaska
Anticollision Report
Gompanys BP Amoco Date: 5110/2006 Time: 13`.12:45 Page:. 2
Field: ,= Prudhoe Bay
Reference Site: PB L Pad CO-ordinat efNN:) Refe rence: WeIIc Plan L-204 (S-U ), True North
Reference Well: Plan L-204 (S-tJ) Vertical'(TVD) Reference: L-204'Pl an S-U 78.6
Reference ~~'ellpathf Plan L-204L3 OBa _Uh: Oracle
Summary
<-------- Affset Wellpath ----- ----> Reference Offset ` Ctr-Ctr No-Go ~Vlovvable
Site Well Wellpath MD MR " Distance Arca Deviation Warnittg
ft ft ft ft ft
', PB L Pad L-201 L-201 L1 P61 V10 9156.38 12170.00 1292.81 262.94 1029.87 Pass: Major Risk
~'i PB L Pad L-201 L-201 L2 V5 10277.55 13490.00 1059.52 305.02 754.49 Pass: Major Risk
PB L Pad L-201 L-201 L3 V2 6547.16 9860.00 1070.49 180.65 889.84 Pass: Major Risk
', PB L Pad L-201 L-201 L3PB1 V6 6459.91 9375.00 1522.08 180.97 1341.11 Pass: Major Risk ',
', PB L Pad L-201 L-201 P61 V12 Out of range
', PB L Pad L-201 L-201 P62 V3 9211.25 12325.00 1294.24 257.59 1036.65 Pass: Major Risk
', PB L Pad L-202 L-202 V5 6650.00 10355.00 3678.10 206.23 3471.87 Pass: Major Risk
PB L Pad L-202 L-202L1 V7 6700.00 10460.00 3684.77 192.82 3491.95 Pass: Major Risk
PB L Pad L-202 L-202L2 V6 6630.99 10110.00 3745.36 190.04 3555.32 Pass: Major Risk
PB L Pad L-202 L-202L3 V6 6600.00 9940.00 3666.60 190.46 3476.14 Pass: Major Risk
PB L Pad L-210 L-210 V6 6650.00 6240.00 1866.24 175.89 1690.35 Pass: Major Risk
PB L Pad L-210 L-210PB1 V8 6623.95 6120.00 1866.47 174.42 1692.05 Pass: Major Risk
PB L Pad L-211 L-211 V6 Out of range
PB L Pad L-211 L-211 PB1 V6 Out of range
PB L Pad
' L-212 L-212 V11 Out of range
~
~ PB L Pad L-212 L-212P61 V9 Out of range
~, PB L Pad L-212 L-212P62 V2 Out of range
PB L Pad L-213 L-213 V8 6219.37 6370.00 997.03 192.03 805.00 Pass: Major Risk
PB L Pad L-214 L-214 V9 6894.77 6550.00 898.18 185.89 712.28 Pass: Major Risk
PB L Pad L-214 L-214A V4 6996.85 6690.00 930.05 244.69 685.37 Pass: Major Risk
PB L Pad L-215 L-215 V7 6018.05 8120.00 5155.60 160.30 4995.30 Pass: Major Risk
PB L Pad L-215 L-215P61 V4 Out of range
PB L Pad L-215 L-215PB2 V2 6019.85 8000.00 5003.57 164.89 4838.69 Pass: Major Risk ',
PB L Pad L-216 L-216 V6 Out of range
', PB L Pad L-218 L-218 V4 Out of range
', PB L Pad L-250 L-250 V4 Out of range
PB L Pad L-250 L-250L1 V14 Out of range
PB L Pad L-250 L-250L2 V10 6710.73 11340.00 3338.48 207.59 3130.89 Pass: Major Risk
'~ PB L Pad L-250 L-250P61 V3 Out of range
PB L Pad L-50 L-50 V1 6325.36 12230.00 4203.73 73.84 4129.89 Pass: Major Risk
PB L Pad L-50 L-50P61 V4 6325.36 12255.00 4201.90 75.32 4126.58 Pass: Major Risk
', PB L Pad NWE1-01 L-100 V2 Out of range
PB L Pad NWE1-01 NWE1-01 V5 Out of range
', PB L Pad Plan L-04 (S-L) Plan L-04 V3 Plan: Pla 6200.00 11165.00 4789.05 82.47 4706.58 Pass: Major Risk
', PB L Pad Plan L-204 (S-U) Plan L-204 OBc V3 Plan 6020.00 6020.00 0.01 0.73 -0.72 FAIL: NOERRORS
', PB L Pad Plan L-204 (S-U) Plan L-204L1 OBd V1 PI 6020.00 6020.00 0.01 0.73 -0.72 FAIL: NOERRORS ',
PB L Pad Plan L-204 (S-U) Plan L-204L2 OBb V1 PI 6020.00 6020.00 0.01 0.73 -0.72 FAIL: NOERRORS ',
', PB L Pad Plan L-217 (N-P) Plan L-217 V2 Plan: PI Out of range ',
PB L Pad Plan L-51 (S-B) Plan L-51 V3 Plan: Pla Out of range ',
PB L Pad Plan L-52 (S-E) Plan L-52 V1 Plan: Pla 6222.35 12550.00 4967.23 112.41 4854.82 Pass: Major Risk ',
PB V Pad Plan V-121 (S-R) Plan V-121 V1 Plan: PI 11946.44 2630.00 5854.08 192.27 5661.82 Pass: Major Risk
PB V Pad Plan V-122 (S-U) Plan V-122 V1 Plan: PI 11945.30 2345.00 6378.08 193.94 6184.13 Pass: Major Risk
PB V Pad Plan V-122 (S-U) Plan V-122P61 V2 Plan: 11945.30 2345.00 6378.08 193.95 6184.12 Pass: Major Risk
PB V Pad Plan V-205 (S-P) Plan V-205 V2 Plan: PI 11200.00 1100.00 7218.40 164.69 7053.72 Pass: Major Risk ',
PB V Pad Plan V-206 (S-S) Plan V-206 V1 Plan: PI 11212.68 1125.00 7194.54 164.89 7029.65 Pass: Major Risk
PB V Pad V-01 V-01 V15 11204.59 1355.00 7131.94 166.68 6965.26 Pass: Major Risk ',
PB V Pad V-02 V-02 V12 11200.00 4650.00 6090.50 182.71 5907.79 Pass: Major Risk ',
PB V Pad V-03 V-03 V7 11946.66 5645.00 5334.22 202.68 5131.54 Pass: Major Risk
'~, PB V Pad V-100 V-100 V7 11945.54 4325.00 5847.15 222.49 5624.66 Pass: Major Risk
PB V Pad V-101 V-101 V7 8350.00 6410.00 5781.53 203.18 5578.36 Pass: Major Risk
PB V Pad V-102 V-102 V5 9232.14 7555.00 2759.46 185.56 2573.90 Pass: Major Risk
PB V Pad V-103 V-103 V6 11947.64 7580.00 581.85 213.86 367.99 Pass: Major Risk
PB V Pad V-104 V-104 V13 8368.86 7020.00 5284.67 192.11 5092.55 Pass: Major Risk
~! PB V Pad V-105 V-105 V13 11200.00 6755.00 3190.75 187.44 3003.31 Pass: Major Risk
PB V Pad V-106 V-106 V10 11691.61 7800.00 1145.38 181.62 963.76 Pass: Major Risk
', PB V Pad V-106 V-106A V9 11082.48 7615.00 2166.28 170.92 1995.36 Pass: Major Risk
', PB V Pad V-106 V-106AP61 V6 11082.48 7615.00 2166.28 170.93 1995.34 Pass: Major Risk
PB V Pad V-106 V-106APB2 V2 11082.48 7615.00 2166.28 170.92 1995.36 Pass: Major Risk ~
PB V Pad V-106 V-106AP63 V2 11082.48 7615.00 2166.28 170.92 1995.36 Pass: Major Risk
PB V Pad V-107 V-107 V5 11100.00 5200.00 5586.10 194.10 5392.00 Pass: Major Risk ',
', PB V Pad V-108 V-108 V7 11100.00 2505.00 6722.49 184.64 6537.86 Pass: Major Risk ',
!, PB V Pad V-109 V-109 V2 11947.19 4215.00 5645.71 206.00 5439.70 Pass: Major Risk ',
~~ PB V Pad V-109 V-109PB1 V5 11947.19 4215.00 5645.71 206.00 5439.71 Pass: Major Risk
BP Alaska i
Anticollision Report
-- _ _-
Cgmpany: BP Amoco Date: 5/10/2006. Time: 13.:1..2:45 Page: 3 ~I
Meld: Prudhoe Bay
Reference,ciite: PB L Pad Co-nrdinate(F~t~;) Reference: Well: Plan L-204 (S>U), True North I
Reference Well: .Plan L-204 (S-tJ) VerlScal ('fVp) Reference: L-204 Plan S-U' 78.6 ~
Reference Wellpath: Plan L-204L3 OBa Db: Oracle, - ~
- - -_-__---- - -~ - ---J--- - _ . ~-- --~
Summary
<~-~__- ~_ Offset Wellpath ----- ----------~ Reteceuce Offset Ctr-Ctr No-Go Allowable
Site Well Wellpath MD MD Destance Area Deviation Warning
ft ft- ft ft ft !
PB V Pad V-109 V-109P62 V2 11947.19 4215.00 5645.71 206.00 5439.70 Pass: Major Risk
PB V Pad V-111 V-111 V25 11946.67 7355.00 5145.28 193.98 4951.30 Pass: Major Risk
PB V Pad V-111 V-111 P61 V8 11936.68 7635.00 5081.49 195.11 4886.38 Pass: Major Risk
PB V Pad V-111 V-111 P62 V2 11570.99 7210.00 5245.32 185.40 5059.92 Pass: Major Risk
PB V Pad V-111 V-111 P63 V6 11947.77 7370.00 5149.06 194.13 4954.93 Pass: Major Risk
PB V Pad V-112 V-112 V7 10920.89 4990.00 6074.58 198.13 5876.45 Pass: Major Risk
PB V Pad V-113 V-113 V6 10900.00 4135.00 6410.79 202.90 6207.89 Pass: Major Risk
PB V Pad V-114 V-114 V5 11180.15 1415.00 7237.08 167.82 7069.26 Pass: Major Risk
PB V Pad V-114 V-114A V4 11180.15 1415.00 7237.08 167.82 7069.26 Pass: Major Risk
PB V Pad V-114 V-114AP61 V4 11180.15 1415.00 7237.08 167.82 7069.26 Pass: Major Risk
PB V Pad V-114 V-114AP62 V2 11180.15 1415.00 7237.08 167.82 7069.26 Pass: Major Risk
PB V Pad V-115 V-115 V5 11945.77 2495.00 6516.63 194.11 6322.53 Pass: Major Risk
PB V Pad V-115 V-115PB1 V4 11945.77 2495.00 6516.64 194.11 6322.53 Pass: Major Risk
PB V Pad V-117 V-117 V9 11935.96 2175.00 6923.54 194.49 6729.06 Pass: Major Risk
PB V Pad V-117 V-117P61 V6 11935.96 2175.00 6923.54 194.49 6729.06 Pass: Major Risk
PB V Pad V-117 V-117P62 V6 11935.96 2175.00 6923.54 194.49 6729.06 Pass: Major Risk
PB V Pad V-119 V-119 V13 11200.00 1735.00 7023.77 171.40 6852.36 Pass: Major Risk ',
PB V Pad V-120 V-120 VS 11947.36 3715.00 4233.00 180.84 4052.17 Pass: Major Risk
PB V Pad V 201 V-201 V8 11123.48 5270.00 4905.75 194.85 4710.90 Pass: Major Risk
PB V Pad V-202 V-202 V9 10609.88 8985.00 813.60 200.05 613.55 Pass: Major Risk
PB V Pad V-202 V-202L1 V5 10642.86 8985.00 804.02 195.67 608.35 Pass: Major Risk
PB V Pad V-202 V-202L2 V5 10589.38 8965.00 844.78 191.96 652.82 Pass: Major Risk
PB V Pad V-203 V-203 V18 7844.87 10620.00 928.50 215.21 713.29 Pass: Major Risk
PB V Pad V-203 V-203L1 V6 7568.87 10620.00 940.24 No Offset Errors
PB V Pad V-203 V-203L2 V4 7807.34 10605.00 935.95 No Offset Errors
PB V Pad V-203 V-203L3 V3 7829.53 10595.00 935.97 No Offset Errors
PB V Pad V-203 V-203L4 V3 7805.12 10590.00 952.04 237.11 714.93 Pass: Major Risk
PB V Pad V-204 V-204 V2 11946.75 6380.00 4644.92 218.03 4426.89 Pass: Major Risk
PB V Pad V-204 V-204L1 V2 11946.08 6220.00 4855.89 215.92 4639.97 Pass: Major Risk
PB V Pad V-204 V-204L1 P61 V6 11946.08 6220.00 4855.89 215.92 4639.97 Pass: Major Risk
PB V Pad V-204 V-204L2 V2 11947.87 6480.00 4477.86 217.75 4260.10 Pass: Major Risk
PB V Pad V-204 V-204L2P61 V5 11936.43 6445.00 4510.80 215.37 4295.43 Pass: Major Risk
PB V Pad V-204 V-204L3 V3 11947.87 6385.00 4604.79 214.39 4390.40 Pass: Major Risk ',
PB V Pad V-204 V-204PB1 V9 11946.25 6375.00 4650.14 218.22 4431.92 Pass: Major Risk
PB V Pad V-204 V-204P62 V2 11946.75 6380.00 4644.92 218.03 4426.89 Pass: Major Risk
PB V Pad V-210 V-210 V9 8709.20 8280.00 782.66 174.47 608.20 Pass: Major Risk ',
PB V Pad V-211 V-211 V5 8350.00 6440.00 4109.22 199.24 3909.98 Pass: Major Risk
PB V Pad V-212 V-212 V7 11944.79 2920.00 5560.44 193.44 5367.00 Pass: Major Risk ',
PB V Pad V-213 V-213 V5 11945.96 3260.00 5044.14 189.50 4854.64 Pass: Major Risk
PB V Pad V-213 V-213P61 V5 11945.96 3260.00 5044.14 189.50 4854.64 Pass: Major Risk
PB V Pad V-214 Plan V-214 V1 Plan: PI 8438.68 7420.00 2539.76 176.87 2362.89 Pass: Major Risk
PB V Pad V-214 V-214P61 V2 11164.01 1005.00 6962.68 163.49 6799.19 Pass: Major Risk
PB V Pad V-214 V-214P62 V3 8422.60 7380.00 2631.76 184.30 2447.46 Pass: Major Risk
PB V Pad V-214 V-214P63 V5 9171.08 6190.00 3043.62 180.47 2863.16 Pass: Major Risk
PB V Pad V-214 V-214P64 V2 10377.12 5335.00 3543.26 184.58 3358.68 Pass: Major Risk
PB V Pad V-216 V-216 V8 11312.49 6800.00 1591.96 196.47 1395.49 Pass: Major Risk
PB V Pad V-221 V-221 V6 11947.02 6080.00 2004.63 173.71 1830.92 Pass: Major Risk
•
'~ Field: Prudhoe Bay ',
~, Site: PB L Pad ~
I, Well: Plan L-204 (S-U) ',
Wellpath: Plan L-204L3 OBa '~,
',
-ISa
100
0
,Oo
-I58
Travelling Cylinder Azimuth (TFO+.4Zq [deg vs Centre to Centre Separation [IOOtt/ink
•
•
TRANSMITTAL LETTER CHECKLIST
WELL NAME ~~~.~ ~ --~ 2,0 ~ ~, ,~~
z
PTD# ZG~'-- O ~~
Development Service Exploratory Stratigraphic Test
Non-Conventional Well
Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter
CHECK ADD-ONS TEXT FOR APPROVAL LETTER i
WHAT (OPTIONS) ~
APPLIES
MULTI LATERAL The permit is for a new wellbore segment of existing
well /d/~Gi ~' 2.0
(If last two digits in
API number are permit Nor2~' API No. 50-0 Z - z 3~3 i y - G o.
/;~ between 60-69) ;Production should continue to be reported as a function of the
original API number stated above. ~
PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both
well name ( PH} and API number
(50- - -) from records, data and logs
acquired for well
SPACING The permit is approved subject to full compliance with 20 AAC
~ EXCEPTION 2.055. Approval to perforate and produce /inject is contingent
~ upon issuance of a conservation order approving a spacing
exception. assumes the
liability of any protest to the spacing exception that may occur.
DRY DITCH All dry ditch sample sets submitted to the Commission must be in
SAMPLE no greater than 30' sample intervals from below the permafrost or
from where samples are first caught and 10' sample intervals
through target zones.
Please note the following special condition of this permit:
Non-Conventional production or production testing of coal bed methane is not allowed
Well for (name of well) until after (Company NameZhas designed and
implemented a water well testing program to provide baseline data
on water quality and quantity. (Company Name) must contact the
Commission to obtain advance approval of such water well testing
program.
Rev: I /2~i06
C:\j ody\transmittal_checkl ist
,~y~~ ~ ~.F T ;; -~;;,~Sg'T f'iEh R Pool PRUGHOE BAY, OR;ON SCHR BL OIL - 6~0 ~ 35 ~ '^ i ;dame PRUDHOE BAY Jfv ~?RIN L-204L3 Program DEV
YTr# .. -""; ~
~„ ~
-~nv BN FXPLGR~TI~P~ ~CP: INC _-: ~r~a~ (aas>T ype
~ ~
DEV r 1-~, i( ~ FoArea _ -- _ ,l;.~it ~nr~ff Shore Oo
--
Adrniru, :~~~,on
1 --
Permit. fee attached...
No - -
NOT REQUIRED FOR THIS LATTERAL
2 Lase number appropriate Yes
3 Unique well name and number Yes
~ Well located in a defined pool Yes
5 Well Jocated proper distance from drilling unit boundary _ Yes
6 Well located proper distance from other wells..... Yes
7 Sufficient acreage available in drilling unit _ Yes
8 If deviated, is wellbore plat included Yes
'9 Operator only affected party. Yes
10 Operator has appropriate. bond in force Yes
~11 Permit can be issued without conservation order Yes
'12 Permit can be issued without administrative approva_I Yes
Appr Date 113 Can permit be approved before 15-day wait Yes
RPC 612912006 ' 14 Well located within area and strata authorized by Injection Order # (put. Ip# in comments) (For NA
15 AI! wells within 1!4 mile area of review identified (For service well only) NA
16 Pre-produced injector:. duration ofpre-production less- than- 3 months (Forservice well only) NA_
17 Nonconven, gas conforms fo A$31.05,030Q.1.A),Q,2.A-D) No_
18
Conductor string provided _
NA_ _ _ __ __
Engineering x,19 Surface casingprotect&oll known USDWs NA
',20 CMTyoI adequate to circulate on conductor & surf csg NA
21 CMT vol. adequate to tie-in long string to surf csg NA
22 CMT will cover all known productive horizons No Slotted.
',23 Casing designs adequate for C, T, B & permafrost- Yes
24 Adequate tankage. or reserve pit Yes Nabors 9ES.
25 Jeore-drill, has.a 10-4.03 for abandonment been approved NA Lateral..
26 Adequate wellbore separation.propcsed Yes
27 If diverter required, does it meet. regulations NA Sidetrack.
28 Drilling fluid program schematic & equip list adequate _ Yes Max MW 9.2 ppg.
Appr Date '29 BOPEs, do they meet regulation Yes
WGA 6130/2006 30 BOPE press rating appropriate; test lo_(put p&ig in comments) Yes Test to 3500 psi. MSP 1558 psi,
',31 Choke manifold complies wlAPl_RP-53 (May 84)_ _ _ _ _ _ _ _ _ _ Yes
',32 Work will occur without operation shutdown. .Yes
'33 Is presence of H2S gas probable. No Not an H2S pad.
34 Mechanical condition of wells within AOR verified (For_service well only) . NA _
X35 Permit can be issued wlo hydrogen sulfide measures _ _ No
Geology i36 Data. presentedon_potentialoverpressurezones NA_
137 Seismic analysis of shallow gas zones.... _ . NA_
Appr Date X38 Seabed condition survey_(if off-shore) NA
RPC 6/2912006 '39 Contact namelphone for weekly progress reports [exploratory only] NA
Well bore seg ~
;~nnuiar Disposal
Geologic Engineering P '
Date: Date Date
Commissioner: Commissioner: ~~ C is n r ~ Q~ ~- I