Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout216-15412775, 14100, 15631 12801 8512 Digitally signed by Sean McLaughlin (4311) DN: cn=Sean McLaughlin (4311) Date: 2025.12.12 07:13:27 - 09'00' Sean McLaughlin (4311) By Grace Christianson at 10:45 am, Dec 12, 2025 *Variance as per 20 AAC 25.112(i): Approved for alternate abandonment plug placement on parent well contingent upon fully cemented liner on upcoming sidetrack. *Window milling on service coil not approved on 10-403, refer to sidetrack PTD for approval. Open hole window milling not to exceed 15'. J.Lau 12/16/25 TS 12/15/25 10-407 325-755 JLC 12/17/2025 12/18/25 To: Alaska Oil & Gas Conservation Commission From: Ryan Ciolkosz Drilling Engineer Date: December 10, 2025 Re:15-16C Sundry Request Sundry approval is requested to set a whipstock in the 15-16C wellbore as part of the drilling and completion of the proposed 15-16D CTD lateral. Proposed plan: Prior to drilling activities, E-line will set a 4-1/2" whipstock. Coil will mill window pre-rig. If unable to set the whipstock or mill the window pre-rig, the rig will perform that work. A coil tubing drilling sidetrack will be drilled with the Nabors CDR2 or CDR3 rig. The rig will move in and test BOPE. If unable to pre-rig, the rig will set the 4-1/2" whipstock and mill a single string 3.80" window + 10' of formation. The well will kick off drilling in the Ivishak Zone 2 and lands in Ivishak Zone 1. The lateral will continue in Zone 1 to TD. The proposed sidetrack will be completed with a 3-1/2"x3-1/4"x2-7/8” 13Cr solid liner, cemented in place and selectively perforated post rig (will be perforated with rig if unable to post rig). This completion will completely isolate and abandon the parent Prudhoe Pool perfs. 20 AAC 25.112(i) Variance Request: Hilcorp requests to plug the existing perforations via the liner cement job, packer whipstock and/or liner top packer, if the liner lap pressure test fails as an alternate plug placement. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current wellbore and proposed sidetrack is attached for reference. Pre-Rig Work: (Estimated to start in Dec 29th, 2026) 1. E-Line : EL set 4-1/2" PKR WS at 12764' at 30 deg ROHS 2. Coil : Mill 3.80" Window (if window not possible, mill w/ rig) 3. Valve Shop : Pre-CTD Tree Work 4. Operations : Remove wellhouse and level pad. Rig Work: (Estimated to start in February 2026) Reference 15-16D Permit submitted in concert with this request for full details. 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,438 psi). Give AOGCC 24hr notice prior to BOPE test. 2. Mill 3.80” Single String 4-1/2" Window (if not already done pre-rig) 3. Drill production lateral: 4.25" OH, ~3123' (12 deg DLS planned). Swap to KWF for liner. 4. Run 3-1/2” x 3-1/4” x 2-7/8” 13Cr solid liner 5. Pump primary cement job*: 38 bbls, 15.3 ppg Class G, 1.24 (ft3/sk), TOC at TOL. Set LTP. If high losses are encountered during cement job and it is deemed necessary, a cement down squeeze from TOL to loss zone will be performed with the rig or service coil (if performed by service coil see future sundry). 6. Only if not able to do with service coil extended perf post rig – Perforate Liner with 1" or 1-1/4" CS Hydril 7. Freeze protect well to a min 2,200' TVD. 8. Close in tree, RDMO. * Alternate plug placement variance request per 20 AAC 25.112(i) Post Rig Work: 1. Valve Shop : Valve & tree work 2. Service Coil : Post rig 500'-1000' EAP - see extended perf procedure attached. 3. Slickline : Set LTP* (if necessary). Set live GLVs. 4. Testing : Portable test separator flowback. Ryan Ciolkosz CC: Well File Drilling Engineer Joe Lastufka 907-244-4357 Well Date Quick Test Sub to Otis - Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular CL Annular Bottom Annular CL Blind/Shears CL Coiled Tubing Pipe / Slips Kill Line Choke Line CL BHA Pipe / Slip CL Coiled Tubing Pipe / Slips TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level CDR#-AC BOP Schematic CDR Rig's Drip Pan Fill Line Normally Disconnected HP hose to Micromotion LP hose open ended to Flowline (optional) Hydril 7 1/16" Annular Blind/Shear CT Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross CT Pipe/Slips BHA Pipe / Slips nneeeeeceeeeeeeeeeeeeeeeeeeeeeeeeeeeeee 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: Extended Perforating Surface Intermediate Tie-Back Liner Liner Liner 2670 4760 5410 7500 7820 Conductor 470 Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: 13b. Pools active after work: Sr Pet Eng:Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations RBDMS JSB 040423 DSR-4/4/23WCB 11-28-2023 This is the end of the work for Sundry 322-722. -WCB The adperfs and the CIBP from the second sundry, 323-079, are correctly shown on the new WBS, below. -WCB 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will planned perforations require a spacing exception?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStrastigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other: Post Initial Injection MIT Req'd? Spacing Exception Required?Yes Yes No No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 15-16C Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 216-154 50-029-21115-03-00 ADL 0028306 , 0028303 16145 Surface Intermediate Tie-Back Liner Liner Liner 8687 2467 4561 7957 1071 3344 14780 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 8716 28 - 2495 26 - 4587 4441 - 12398 12219 - 13290 12801 - 16145 2470 28 - 2495 26 - 4389 4288 - 8225 8077 - 8671 8512 - 8687 15631 2670 4760 5410 7500 7820 14780 , 15631 5380 6870 7240 8430 8620 14850 - 16129 4-1/2" 12.6# 13Cr85 24 - 122288716 - 8689 Conductor 80 20" 29 - 109 29 - 109 1490 470 4-1/2" HES TNT Perm No SSSV 12108 7987 Date: Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com 907-564-5280 PRUDHOE BAY 3/15/2023 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 10/2022 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Samantha Carlisle at 2:48 pm, Feb 09, 2023 323-079 Digitally signed by Eric Dickerman (4002) DN: cn=Eric Dickerman (4002), ou=Users Reason: Signed for Bo York with Approval Date: 2023.02.09 13:49:40 -09'00' Eric Dickerman (4002) DLB 02/13/2023 2470 X 10-404 DSR-2/9/23MGR10FEB23GCW 02/14/23 JLC 2/14/2023 2/14/23Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.02.14 15:26:22 -09'00' RBDMS JSB 022123 15-16C PTD:216-154 API: 50-029-21115-03-00 Well Name:15-16C API Number:50-029-21115-03-00 Current Status:Online, Operable Rig:Coil Estimated Start Date:3/15/23 Estimated Duration:3 days Regulatory Contact:Carrie Janowski 564-5179 Permit to Drill Number 216-154 First Call Engineer:Jerry Lau (907) 564-5280 (O)(907) 360-6233 (M) Second Call Engineer:Dave Bjork (907) 564-4672 (O)(907) 440-0331 (M) Current Bottom Hole Pressure:3,408 psi @ 8,800’ TVD 7.4 PPGE 11/01/16 adj well 15-16B Max. Expected BHP:3,350 psi @ 8,800’ TVD 7.4 PPGE | Average Ivishak BHP) Max. Anticipated Surface Pressure:2,470 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:2,434 psi (Taken on 09/30/22) Min ID 2.31” @ 12804’ MD LTP X NIP Max Angle:96° @ 16072’ MD Tie In Log:HES PBU_15-16C_COILFLAG_30SEP22 Brief Well Summary: 15-16C is a Gravity Drainage CTD sidetrack from Dec ‘16 targeting Z1A production. The original toe perforations and added perfs from March ’18 and March ’20 are no longer competitive due to HGOR. The number of CIBPs stacked in liner should be kept at a minimum to ensure that the wellbore can be accessed when Gas Cap Water injection flooding makes it to DS-15. The LTP passed a drawdown test in ’22.In January ’23, CTU milled a plug and then set another plug uphole to all existing perfs then added 180’ of perfs in belly of lateral. These perfs where structurally higher than the toe perfs and ended up POP’ing above marginal GOR. The next target in heel is across a fault from the rest of lateral and located structurally lower in base of Z1A, which presents a much higher chance of success. Objective: First, CT will mill a CIBP. Next, CT shut off gas by setting a shallower CIBP above the existing HGOR perf intervals then add 180’ of perforations using the coiled tubing open-hole deployment system.Secondly, CT will mill a CIBP. Next, CT will shut off gas by setting a shallower CIBP above the existing HGOR perf intervals then add 375’ of Z1A perforations using the coiled tubing open-hole deployment system. Procedure: Coiled Tubing Part 1 1. Mill and recover 2-7/8” NS CIBP @ 15320’ MD. May use venturi burnshoe BHA or alternative per wellsite supervisor discretion. 2. Perform logging tie in run. Flag coil for CIBP 3. Confirm good log data. 4. RIH with 2-7/8” CIBP, kill well with 1% KCl then set plug @ 14780’ MD. Flag coil for perf run. 5. POOH and leave 60/40 cap in well to prevent freezing during open hole deployment. 6. Perform positive pressure test on LTP by pressuring up TBG to 1000 psi while all perfs are isolated. Monitor for 10 min. 7. Prep for open hole deployment 15-16C PTD:216-154 API: 50-029-21115-03-00 Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 8. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 9. Load will with 1% KCL/SW down TBG if needed. Max tubing pressure 2500 psi. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 209 bbls i. 4-1/2” Tubing – 12791’ X 0.0152 bpf = 195 bbls ii. 3-1/2” and 3-1/4” Liner – 481’ X 0.0087 bpf + 509’ X 0.0079 bpf = 8 bbls iii. 2-7/8” Liner – 1069’ X 0.0058 bpf = 6 bbls b. 13Cr80 TBG from surface to TBG tail at 12228’ MD 10. At surface, prepare for deployment of TCP guns. 11. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 12. *Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a. At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 13.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Perf Schedule *2" Millennium guns were used to estimate for this job and calculate gun weights. Perf Interval (RUN 1) Perf Length Gun Length Weight of Gun (lbs) 5.58 lbs/ft 14500 - 14680 180’180’1005 14. RIH with perf guns and tie-in to coil flag. Pickup and perforate interval per Perf Schedule above. a. Note any tubing pressure change in WSR. 15-16C PTD:216-154 API: 50-029-21115-03-00 15. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary, before pulling to surface. 16. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 17. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 18. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 19. FP Well 20. RDMO CTU. Coiled Tubing Part 2:MIRU service coil. PT PCE. MU MHA, Milling BHA and RIH to: 21. Mill and recover 2-7/8” NS CIBP @ 14780’ MD. May use venturi burnshoe BHA or alternative per wellsite supervisor discretion. 22. Perform logging tie in run. Flag coil for CIBP. 23. Confirm good log data. 24. RIH with 2-7/8” CIBP, kill well with 1% KCl then set plug @ 14,100’ MD. Flag coil for perf run. 25. POOH and leave 60/40 cap in well to prevent freezing during open hole deployment. 26. Prep for open hole deployment Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 27. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 28. Load will with 1% KCL/SW down TBG if needed. Max tubing pressure 2500 psi. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 207 bbls i. 4-1/2” Tubing – 12791’ X 0.0152 bpf = 195 bbls ii. 3-1/2” and 3-1/4” Liner – 481’ X 0.0087 bpf + 509’ X 0.0079 bpf = 8 bbls iii. 2-7/8” Liner – 719’ X 0.0058 bpf = 4 bbls b. 13Cr80 TBG from surface to TBG tail at 12228’ MD 29. At surface, prepare for deployment of TCP guns. 30. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 31. *Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. 15-16C PTD:216-154 API: 50-029-21115-03-00 a. At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 32.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Make up PCE. Perf Schedule *2" Millennium guns were used to estimate for this job and calculate gun weights. Perf Interval (RUN 1)Perf Length Gun Length Weight of Gun (lbs) 5.58 lbs/ft 13675’ – 14050’375’375’2093 33. RIH with perf guns and tie-in to coil flag. Pickup and perforate interval per Perf Schedule above. a. Note any tubing pressure change in WSR. 34. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary, before pulling to surface. 35. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 36. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 37. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 38. FP Well 39. RDMO CTU. Attachments: 1. Current Wellbore Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Standing Orders for Open Hole Well Control during Perf Gun Deployment 5. Equipment Layout Diagram 6. Tie In Log/Perf Sheet 7. Cross Section 8. Sundry Change Form 15-16C PTD:216-154 API: 50-029-21115-03-00 Current Wellbore Schematic 15-16C PTD:216-154 API: 50-029-21115-03-00 15-16C PTD:216-154 API: 50-029-21115-03-00 Proposed Wellbore Schematic 15-16C PTD:216-154 API: 50-029-21115-03-00 Coiled Tubing BOPs 15-16C PTD:216-154 API: 50-029-21115-03-00 Standing Orders for Open Hole Well Control during Perf Gun Deployment 15-16C PTD:216-154 API: 50-029-21115-03-00 Equipment Layout Diagram 15-16C PTD:216-154 API: 50-029-21115-03-00 Tie In:HES PBU_15-16C_COILFLAG_30SEP22 15-16C PTD:216-154 API: 50-029-21115-03-00 Cross Section 15-16C PTD:216-154 API: 50-029-21115-03-00 Changes to Approved Sundry Procedure Date: 2/9/23 Subject: Adding 2 nd round of CT work (Changes in Red) Sundry #: 322-722 Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) 21- 39 3-4 2/9/23 Part 2: CT Mill Plug, Set CIBP, Add Perf. Changes in Red.JL ED Approval: Eric Dickerman 2/9/23 Operations Manager Date Prepared: Jerry Lau 2/9/23 Operations Engineer Date 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will planned perforations require a spacing exception?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStrastigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other: Post Initial Injection MIT Req'd? Spacing Exception Required?Yes Yes No No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 15-16C Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 216-154 50-029-21115-03-00 ADL 0028306 , 0028303 16145 Surface Intermediate Tie-Back Liner Liner Liner 8687 2467 4561 7957 1071 3344 15320 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 8709 28 - 2495 26 - 4587 4441 - 12398 12219 - 13290 12801 - 16145 2470 28 - 2495 26 - 4389 4288 - 8225 8077 - 8671 8512 - 8687 none 2670 4760 5410 7500 7820 15320 , 15631 5380 6870 7240 8430 8620 14850 - 16129 4-1/2" 12.6# 13Cr85 24 - 122288716 - 8689 Conductor 80 20" 29 - 109 29 - 109 1490 470 4-1/2" HES TNT Perm No SSSV 12108 7987 Date: Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com 907-564-5280 PRUDHOE BAY 1/15/2023 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 10/2022 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov / 322-722 By Anne Prysunka at 8:17 am, Dec 28, 2022 Digitally signed by Bo York (1248) DN: cn=Bo York (1248), ou=Users Date: 2022.12.23 11:01:36 -09'00' DSR-1/3/23 10-404 2470 DLB 12/28/2022MGR04JAN22 X GCW 01/04/23 Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2023.01.05 12:14:17 -09'00' RBDMS JSB 011023 15-16C PTD:216-154 API: 500292111503 Well Name:15-16C API Number:500292111503 Current Status:Online, Operable Rig:Coil Estimated Start Date:1/15/23 Estimated Duration:3 days Regulatory Contact:Carrie Janowski 564-5179 Permit to Drill Number 216-154 First Call Engineer:Jerry Lau (907) 564-5280 (O)(907) 360-6233 (M) Second Call Engineer:Dave Bjork (907) 564-4672 (O)(907) 440-0331 (M) Current Bottom Hole Pressure:3,408 psi @ 8,800’ TVD 7.4 PPGE 11/01/16 adj well 15-16B Max. Expected BHP:3,350 psi @ 8,800’ TVD 7.4 PPGE | Average Ivishak BHP) Max. Anticipated Surface Pressure:2,470 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:2,434 psi (Taken on 09/30/22) Min ID 2.31” @ 12804’ MD LTP X NIP Max Angle:96° @ 16072’ MD Tie In Log:HES PBU_15-16C_COILFLAG_30SEP22 Brief Well Summary: 15-16C is a Gravity Drainage CTD sidetrack from Dec ‘16 targeting Z1A production. The original toe perforations and added perfs from March ’18 and March ’20 are no longer competitive due to HGOR. The number of CIBPs stacked in liner should be kept at a minimum to ensure that the wellbore can be accessed when Gas Cap Water injection flooding makes it to DS-15. The LTP passed a drawdown test in ’22. Economics:Forecasting 225 IOR at a cost of $175 M. Objective: First, CT will mill a CIBP. Next, CT shut off gas by setting a shallower CIBP above the existing HGOR perf intervals then add 180’ of perforations using the coiled tubing open-hole deployment system. Procedure: Coiled Tubing 1. Mill and recover 2-7/8” NS CIBP @ 15320’ MD. May use venturi burnshoe BHA or alternative per wellsite supervisor discretion. 2. Perform logging tie in run. Flag coil for CIBP 3. Confirm good log data. 4. RIH with 2-7/8” CIBP, kill well with 1% KCl then set plug @ 14780’ MD. Flag coil for perf run. 5. POOH and leave 60/40 cap in well to prevent freezing during open hole deployment. 6. Perform positive pressure test on LTP by pressuring up TBG to 1000 psi while all perfs are isolated. Monitor for 10 min. 7. Prep for open hole deployment Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after MIRU service coil. PT PCE. MU MHA, Milling BHA and RIH. -00 DLB 15-16C PTD:216-154 API: 500292111503 perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 8. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 9. Load will with 1% KCL/SW down TBG if needed. Max tubing pressure 2500 psi. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 209 bbls i. 4-1/2” Tubing – 12791’ X 0.0152 bpf = 195 bbls ii. 3-1/2” and 3-1/4” Liner – 481’ X 0.0087 bpf + 509’ X 0.0079 bpf = 8 bbls iii. 2-7/8” Liner – 1069’ X 0.0058 bpf = 6 bbls b. 13Cr80 TBG from surface to TBG tail at 12228’ MD 10. At surface, prepare for deployment of TCP guns. 11. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 12.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 13.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Perf Schedule *2" Millennium guns were used to estimate for this job and calculate gun weights. Perf Interval (RUN 1) Perf Length Gun Length Weight of Gun (lbs) 5.58 lbs/ft 14500 - 14680 180’180’1005 14. RIH with perf guns and tie-in to coil flag. Pickup and perforate interval per Perf Schedule above. a. Note any tubing pressure change in WSR. 15. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary, before pulling to surface. 16. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 17. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 18. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 19. FP Well 20. RDMO CTU. Make up PCE. 15-16C PTD:216-154 API: 500292111503 Attachments: 1. Current Wellbore Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Standing Orders for Open Hole Well Control during Perf Gun Deployment 5. Equipment Layout Diagram 6. Tie In Log/Perf Sheet 7. Cross Section 8. Sundry Change Form 15-16C PTD:216-154 API: 500292111503 Current Wellbore Schematic 15-16C PTD:216-154 API: 500292111503 15-16C PTD:216-154 API: 500292111503 Proposed Wellbore Schematic 15-16C PTD:216-154 API: 500292111503 Coiled Tubing BOPs 15-16C PTD:216-154 API: 500292111503 Standing Orders for Open Hole Well Control during Perf Gun Deployment 15-16C PTD:216-154 API: 500292111503 Equipment Layout Diagram 15-16C PTD:216-154 API: 500292111503 Tie In:HES PBU_15-16C_COILFLAG_30SEP22 15-16C PTD:216-154 API: 500292111503 Cross Section 15-16C PTD:216-154 API: 500292111503 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date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y Anne Prysunka at 8:50 am, Oct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aDQGDEOHWRZRUNGRZQ /RJIURP WR SDLQWLQJDUHG IODJDW 322+ &RQWLQXHGRQ:65  /56&78%OXH&RLO &RQWIURP:65 -RE2EMHFWLYH6HW&,%3 &RQILUP FRUUHFWLRQ0DNHXS&,%3DQG5,+7LHLQWRWKHIODJDQGVHWZLWK 0(DW 0'322+ ORDGWKHZHOOZLWK%%/ VRIGLHVHOIRUXQGHUEDODQFH 5'02 -RE&RPSOHWH 'DLO\5HSRUWRI:HOO2SHUDWLRQV 3%8& VHWZLWK 0(DW 0' Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:216-154 6.50-029-21115-03-00 PRUDHOE BAY, PRUDHOE OIL BP Exploration (Alaska), Inc 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 16145 15631 8709 12108 None 15631 7987 Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" 29 - 109 29 - 109 Surface 2467 13-3/8" 28 - 2495 28 - 2495 Intermediate 4561 9-5/8" 26 - 4587 26 - 4389 Liner 7957 7" 4441 - 12398 4288 - 8225 Liner 1071 4-1/2" 12219 - 13290 8077 - 8671 Perforation Depth: Measured depth: 14850 - 16129 feet True vertical depth:8716 - 8689 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr85 24 - 12228 24 - 8085 12108 7987Packers and SSSV (type, measured and true vertical depth) 4-1/2" HES TNT Perm Packer Liner 3344 3-1/2"x3-1/4"x2-7/12801 - 16145 8512 - 8687 1490 5380 6870 7240 8430 10160/8620/10570 470 2670 4760 5410 7500 10530/7820/11160 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 310021508 3935448 0 241 1248 1005 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Brown, Don L. browd2@BP.com Authorized Name:Brown, Don L. Authorized Title: Authorized Signature with Date:Contact Phone:+1 9075644675 Treatment descriptions including volumes used and final pressure: 13. Petroleum Engineer Operations Performed1. Abandon …Plug Perforations …Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8687 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Operations shutdown … Change Approved Program … Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7.Property Designation (Lease Number):ADL 028306 & 028303 PBU 15-16C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations Brown, Don L.Brown, Don L. 2020.04.14 15:29:39 -08'00' By Samantha Carlisle at 4:13 pm, Apr 14, 2020 RBDMS HEW 4/14/2020DSR-4/14/2020MGR15APR20 ACTIVITYDATE SUMMARY 3/10/2020 ***WELL FLOWING ON ARRIVAL*** (Perforation) SWCP 4521 RIG UP & STBY FOR LOW TEMP ***CONT WSR ON 3/11/20*** 3/11/2020 ***CONT WSR FROM 3-10-2020*** (perforation) DRIFT W/ 30' x 2.15" DMY GUNS TO DEVIATION @ 13,207' SLM ***WELL PUT BACK ONLINE ON DEPARTURE*** 3/16/2020 CTU#8 1.75" CT. Add perf. MIRU. Pump drift ball. Perform weekly BOPE test. ***In Progress*** 3/17/2020 CTU#8 1.75" CT. Add perf. Continue to test BOPE. Pump & recover drift ball. Shut in well & LRS FP flowline w/ 100bbls of crude. RIH w/ HESS GR/CCL log interval 15, 205' - 14,750' ctm. Good data -4.30' correction. MU & RIH w/ perf gun #1. Correct depth. ***In Progress*** 3/18/2020 CTU#8 1.75" CT. Add perf. Perforate 15099 - 15130ft. POOH. MU gun #2 and RIH. Load well. Perforate from 15067 to 15098ft. Check chains & change packoffs. Perform chrome management. RIH & log well for tie-in. POH. ***In Progress*** 3/19/2020 CTU#8 1.75" CT. Add perf. Continue to POH w/ logging BHA. Good data -4.30' correction. MU & RIH w/ perf gun #3 to flag, correct depth. Perforate 15034' - 15065'. MU & RIH w/ perf gun #4 to flag, correct depth. Perforate 14915' - 14946' ctm. Make up and RIH with logging tools. ***Job Continued on 3/20/20*** 3/20/2020 CTU#8 1.75" CT. Add perf. Continue RIH with logging tools. Log from 15300 to 12000. Flag pipe at 14900. Circulate well over to 1% KCl with safelube while POOH. MU & RIH w/ perf gun #5 to flag, correct depth, Perforate 14883' - 14914' ctm. MU & RIH w/ perf gun #6 to flag and correct depth to top shot. Perforate 14850-14881. POOH. Freeze well with 38bbl of 60/40. ***Job Continued on 3/21/20*** 3/21/2020 CTU#8 1.75" CT. Add perf. Continue POOH with perf gun #6. DSO notified of status. RDMO. ***Job Complete*** Daily Report of Well Operations PBU 15-16C 216154 • 28358 TELL LOG TRANSMITTAL#904008271 To: Alaska Oil and Gas Conservation Comm. July 3, 2017 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 c�+ Anchorage, Alaska 99501 RECEIVED DATA LOGGED "r/%O/201-'( vl K BENDER RE: Coil Flag Log: 15-16C JUL U 7 2017 Run Date:5/1/2017 AOGCC The technical data listed below is being submitted herewith.Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage,AK 99518 15-16C Digital Data(LAS), Digital Log file(Field Data) 1 CD Rom 50-029-21115-03 Coil Flag Log(Field Print) 1 Color Log 50-029-21115-03 SCANNED AUG 0 9 2017. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: iD,012.a4zet... ..eeet STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Abandon ❑ Plug Perforations B Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: 5 C-1- C I B P 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work feet Junk 5. Permit to Drill Number: 216-154 3. Address: P.O. Box 196612 Anchorage, Development Q Exploratory ❑ Effective Depth: measured AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-21115-03-00 7. Property Designation (Lease Number): ADL 0028306 8. Well Name and Number: PBU 15-16C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: 7986 feetAOG■ A �T Casing: PRUDHOE BAY, PRUDHOE OIL Size: 11. Present Well Condition Summary: Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl EC E I V D Total Depth: measured 16145 feet Plugs measured 15631 feet 1180 256 14. Attachments: (required per 20 AAc 25.070.25.071, & 25.283) 15. Well Class after work: true vertical 8687 feet Junk measured feet MAY 31 2011 Copies of Logs and Surveys Run ❑ Effective Depth: measured 15631 feet Packer measured 12107 feet GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. true vertical 8709 feet Packer true vertical 7986 feetAOG■ A �T Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 91.5# H-40 29-109 29-109 1490 470 Surface 2467 13-3/8" 72# L-80 28-2495 28-2495 4930 2670 Intermediate 4562 9-5/8" 47# L-80 25-4587 25-4389 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 15370 - 15600 feet 15665 - 15735 feet 15787 - 15828 feet 15975 - 16129 feet True vertical depth: 8709 - 8708 feet feet 8708 - 8706 feet 8705 - 8705 feet 8704 - 8689 feet Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary Intervals treated (measured): 4-1/2" 12.6# 13Cr85 23-12226 4-1/2" HES TNT Perm Packer 12107 Treatment descriptions including volumes used and final pressure: 23-8084 7986 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 39116 0 1140 464 Subsequent to operation: 857 9096 0 1180 256 14. Attachments: (required per 20 AAc 25.070.25.071, & 25.283) 15. Well Class after work: (907)564-5365 Form 10-404 Revised 04/2017 Daily Report of Well Operations Q Exploratory ❑ Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. I Sundry Number or N/A if C.O. Exempt: N/A Authorized Name: Odom, Kristine Contact Name: Odom, Kristine Authorized Title: DS 06 & 13 PE Contact Email: Kristine.Odom@bp.com Authorized Signature: Date: J 3� �Contact Phone: (907)564-5365 Form 10-404 Revised 04/2017 RBDMS L _-r J ` 1 210" I Submit Original Only RECEIVED MAY 31 2017 ,A.CGCC Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary May 31, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Plug to shut off Gas Production for Well 15-16C, PTD # 216-154. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Casing / Tubing Attachment PBU 15-16C Casing CONDUCTOR Length 80 Size MD 20" 91.5# H-40 29 - 109 TVD 29 - 109 Burst 1490 Collapse 470 SURFACE 2467 13-3/8" 72# L-80 28 - 2495 28 - 2495 4930 2670 INTERMEDIATE 4562 9-5/8" 47# L-80 25 - 4587 25 - 4389 6870 4760 LINER 7957 7" 26# L-80 4440 - 12396 4287 - 8223 7240 5410 LINER 1073 4-1/2" 12.6# L-80 12217 - 13290 8076 - 8671 8430 7500 LINER 471 3-1/2" 9.3# L-80 12801 - 13272 8512 - 8668 10160 10530 LINER 509 3-1/4" 6.6# L-80 13272 - 13781 8668 - 8688 8620 7820 LINER 2364 2-7/8" 6.5# L-80 13781 - 16145 8688 - 8687 10570 11160 TUBING 12204 4-1/2" 12.6# 13Cr85 23 - 12226 23 - 8084 9020 1 8540 Daily Report of Well Operations PBU 15-16C ACTIVITYDATE SUMMARY **CTU#14 1.75" CT** Job Scope: Profile mod (Gas shut off) **Continued on 05/02/17** MIRU. MU & RIH w/ WFD MHA & HES GR/CCL carrier with 2.25" JSN. Tag 3k down PBTD at 16107' ctm (corrected 16129'). Log up at 50 fpm from TD to 12000'. Paint flag at 15700'. POOH. Confirmed good data / +9' correction. (Tie into Baker Hughes GR/Res MWD log date ending December -28-2016). MU & RIH w/ 2-7/8" WFD CIBP. Set CIBP ME at 15632' ctm (top of plug @ 5/1/2017 15631.5') Stacked down 2.5k and confirmed good set. POOH. ** CTU#14 1.75" CT, Cont from 5-1-17 WSR** POOH with WFD setting tool. Freeze protect tbg to 2500' with 50/50 meoh. RDMOL 5/2/2017 **Job complete** Fluids Summary Bbls Type 123 50/50 Methanol/Water 155 Slick 1 % KCL w/SafeLube 71.0' 61' 36.02' 3000' 96" @ 16072' NA 8800' SS 13 3!8 CSG, 72#, L-80, D = 12.347 2496'_ Minimum ID = 2.31" @ 12804' 2-7/8" X NIPPLE IN LTP 1*5-16C SAFETY NOTES: WELL ANGLE > "-70° @ 13032'. **"4-112" CHROME TBG***MAX DLS:25.1* @ 15129'. =r-2230' 4-1 /2" HES X NP, D = 3.813" GAS LIFT MANDRRS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3550 3531 18 MMG DOME RK 16 11/02!16 3 6987 5503 61 KBG2 DOME BK 16 11/02/16 2 10590 7004 66 KBG2 DW SK 0 04/09/10 1 12039 7930 35 KBG2 DW BK 0 04/09/10 4441'—�9-5/8" X 7" ZXP LTPw /TIEBACK SLV, D = 6.290" 4457— (9-5/8" X 7" BKR FLDCLOCK LNR HGR, ID = 6-180- 9-5/8" WHIPSTOCK (03/21/10)7_4687* 9-5/8" CSG 47#, L-80 BTC, D = $.681"7' MILLOUT WINDOW (15-16$) 4587'-4604- 12073' 471!2" HES X NP, D = 3.813" 12108' 1—i7" X 4-1/2 HES TNT PKR D 3.856" .l 12139' 4-1 /2" HE5 X NP, D = 3.813" 4-1/2" TBG, 12.6#, 13CR-85 VAM TOP, 12228' 0152 bpf, D = 3.958" \ 12216' 4-112" HES XN NP MILLED TO 3-80" (11/27/16) PERFORA11ON SUMMARY REE LOG: _ _ ON _i®1 ANGLE AT TOP PERF: 88" @ 15370' Note: Refer to Production DB for historical pert data SIZE SPF I INTERVAL Opn/Sqz SHOT SOZ 2" 6 15370 - 15600 O 12/31/16 2" 6 15665- 15735 C 12/31/16 2" 6 15787 - 15828 C 12/31/16 2" 6 15975 - 16129 C 12/31/16 _L L-80 VAM TOP HC, — 12398" 0383 bpf,D = 6.276" 3-112" X 3-3/16 X 2-7/8" TOL/TOC 12801' 371!2" LNR, 9.9#, L-80 STL, .0087 bpf, ID= 2.992"13272' 4-112" KB PKR WHIPSTOCK (12/18116)132$9' 4-1/2" LNR, 126#, L-80 BT -M, 13289' .0152 bpf, D = 3.958" 3-114" L.NR 6 6# L-80 TCN, .0079 bpf, D = 2.850" 1378V (PBTD 1613W 2-7/8 LNR 6.5#, L-80 STL, .0058 bpf, D = 2 441" 16146' 12219' � 7" X 5" HRD-E ZXPN LTPw /TIEBACK SLV, D = 4.190" 12228' 4-112" WLEG, 12236' Fly( CK LNR HGR D = 4.340" - 7777 --..__ - _. 12246' 5" —x4-1/2- XO, D = 3.910" 12791'—t45KB BKR HY BRD LTP (02102117) 12$01'3.70" DEPLOY SLV, D = 3.00" 12804'2-7/8" X NIR D= 2.31" 12$22' 3-112" X NP, D = 2.812' 13272' 3-1/2" X 3-3/16" XO, ID = 2.876" MLLOUT WINDOW (15-16C) 13290'-13298' ( 137$1' 3-3116" X 2-718" XO, D = 2.377" 14262- ----- 15631- 15631' 2-718" WFDCBP(05/01/17) PRUCHOE BAY LUT WELL 15-16C PERMfT No: 11161540 API No: 50-029-21115-03 SEC 22, T1 1N, RUE, 854' FNL & 165' FWL DATE REV BY COKUNTS DATE REV BY COMMENTS 06/30/84 ORIGINAL COMPLETION 01/05/17 JMD DR -G HO CORRECTIONS 11/18/90 LAST WORKOVER 01/09/17 JT/JMD FINAL ODE APPROVAL 11120101 CTD SIDETRACK (15-16?) 02/06/17 JDMIJMD SET HY BRID LTP w /X NP (02/0211 12/31101 CH/TP CTD SIDETRACK (15-16A?) 05/03/17 MSS/JMD SET CUP (05/01/17) 04/01110 ME5 CTD SIDETRACK (15-168) BP Exploration (Alaska) 01/01/17 NORQIC2 CTD ST DETRACK(15-16C) DATA SUBMITTAL COMPLIANCE REPORT 4/3/2017 Permit to Drill 2161540 Well Name/No. PRUDHOE BAY UNIT 15-16C p5 1 b Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21115-03-00 D MD 16145 TVD 8687 Completion Date 1/1/2017 omp�on Status 1-0I1- Current Status 1-0I1- UIC No REQUIRED INFORMATION Mud Log No ✓ Samples No v DATA INFORMATION Types Electric or Other Logs Run: MWD/GR/RES Well Log Information: Log/ C Electr Data Digital Dataset Log 9 Lo Run Type Med/Frmt Number Name Scale Media No ED C 27911 Digital Data ED C 27911 Digital Data ED C 27911 Digital Data ED C 27911 Digital Data ED C 27911 Digital Data ED C 27911 Digital Data ED C 27911 Digital Data ED C 27911 Digital Data ED C 27911 Digital Data ED C 27911 Digital Data ED C 27911 Digital Data ED C 27911 Digital Data ED C 27911 Digital Data ED C 27911 Digital Data AOGCC 16C_GR_Res _28DEC2016_TVDSS_FINAL_FIEL- D_BHI_CTK.pdf Page I of 5 Directional Survey Yes (data taken from Logs Portion of Master Well Data Maint) Interval OH / Start Stop CH Received Comments 12764 16145 1/12/2017 Electronic Data Set, Filename: 15- 16C_LW D_FINAL — INAL_ FIELD_COMPOSITE_28DEC 2016 BHI CTK.las 1/12/2017 Electronic File: 13463660 9-15-16.pdf - 1/12/2017 Electronic File: Post Run 04 13463660.pdf ' 1/12/2017 Electronic File: Post Run 10 13463660.pdf 1/12/2017 Electronic File: 15- 16C—GR _ Res_ 28DEC2016_MD_FINAL_FIELD_ ' BHI_CTK.cgm 1/12/2017 Electronic File: 15- 16C GR Res 28DEC2016 TVDSS FINAL_FIEL' D_BHI_CTK.cgm 1/12/2017 Electronic File: 15- t� 16C_GR_Res _28DEC2016_MD_FINAL_FIELD_ ' 8HI_CTK.pdf 1/12/2017 Electronic File: 15- 16C_GR_Res _28DEC2016_TVDSS_FINAL_FIEL- D_BHI_CTK.pdf 1/12/2017 Electronic File: 15-16C Final Survey Report.pdf. 1/12/2017 Electronic File: 15-16C Final Survey Report.txt 1/12/2017 Electronic File: 15-16C Final Surveys.csv 1/12/2017 Electronic File: 15-16C Final Surveys.xlsx , 1/12/2017 Electronic File: 15- 16C_25_tapescan_BHI_CTK.txt - 1/12/2017 Electronic File: 15-16C_5_tapescan_BHI_CTK.txt Monday, April 3, 2017 DATA SUBMITTAL COMPLIANCE REPORT 4/3/2017 Permit to Drill 2161540 Well Name/No. PRUDHOE BAY UNIT 15-16C Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21115-03-00 MD 16145 TVD 8687 ED C 27911 Digital Data ED C 27911 Digital Data ED C 27911 Digital Data Completion Date 1/1/2017 Completion Status 1 -OIL Log C 27911 Log Header Scans 0 0 Log C 27912 Log Header Scans 0 0 ED C 27912 Digital Data 12764 13982 ED C 27912 Digital Data ED C 27912 Digital Data ED C 27912 Digital Data ED C 27912 Digital Data ED C 27912 Digital Data ED C 27912 Digital Data ED C 27912 Digital Data ED C 27912 Digital Data ED C 27912 Digital Data ED C 27912 Digital Data ED C 27912 Digital Data AOGCC Page 2 of 5 Current Status 1 -OIL UIC No 1/12/2017 Electronic File: 15-16C_output.tap ' 1/12/2017 Electronic File: 15- 16C—GR — GR_ Res_ 28DEC2016_MD_FINAL_FIELD_ BHI CTK.tif 1/12/2017 Electronic File: 15- 16C_GR Res_ 28DEC2016_TVDSS_FINAL_FIEL. D BHI CTK.tif 2161540 PRUDHOE BAY UNIT 15-16C LOG HEADERS 2161540 PRUDHOE BAY UNIT 15-16C PB1 LOG HEADERS 1/12/2017 Electronic Data Set, Filename: 15- 16CPB1_LW D_FINAL — INAL_ FIELD—COMPOSITE-20 DEC2016 BHI CTK.las 1/12/2017 Electronic File: 13463660 9-15-16.pdf 1/12/2017 Electronic File: Post Run 04 13463660.pdf- 1/12/2017 Electronic File: Post Run 10 13463660.pdf 1/12/2017 Electronic File: 15- 16CPB1—GR _ Res FINAL FIE _20DEC2016_MD LD_BHI_CTK.cgm 1/12/2017 Electronic File: 15- 16CPB 1_GR_ Res_ 20DEC2016_TVDSS_FINAL_ FIELD_BHI_CTK.cgm 1/12/2017 Electronic File: 15- P 16CPB1_GR_Res _20DEC2016_MD_FINAL_FIE LD_BHI_CTK.pdf 1/12/2017 Electronic File: 15- 16CPB1_GR_Res _20DEC2016_TVDSS_FINAL_ FI ELD_BHI_CTK.pdf 1/12/2017 Electronic File: 15-16CPB1 Final Survey Report.pdf 1/12/2017 - Electronic File: 15-16CPB1 Final Survey Report.txt 1/12/2017 Electronic File: 15-16CPB1 Final Surveys.csv , 1/12/2017 Electronic File: 15-16CPB1 Final Surveys.xls a Monday, April 3, 2017 DATA SUBMITTAL COMPLIANCE REPORT 4/3/2017 Permit to Drill 2161540 Well Name/No. PRUDHOE BAY UNIT 15-16C MD 16145 TVD 8687 Completion Date 1/1/2017 ED C 27912 Digital Data ED C 27912 Digital Data ED C 27912 Digital Data ED C 27912 Digital Data ED C 27912 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21115-03-00 Completion Status 1-0I1- Current Status 1-0I1- UIC No 1/12/2017 Electronic File: 15- 16CPB1_25_tapescan_BHI_CTK.txt o 1/12/2017 Electronic File: 15- 16CPB 1 _5_tapescan_BH I_CTK.txt 1/12/2017 Electronic File: 15-16CPB1_output.tap 1/12/2017 Electronic File: 15- 16CPB1—GR _ Res_ 20DEC2016_MD_FINAL_FIE ,. LD BHI CTK.tif 1/12/2017 Electronic File: 15- 16CPB1—GR _ Res_ 20DEC2016_TVDSS_FINAL_ ' FIELD BHI CTK.IR 12764 15650 1/12/2017 Electronic Data Set, Filename: 15- 16CPB2_LW D_ FINAL_ FIELD—COMPOSITE-24 DEC2016 BHI CTK.las 1/12/2017 Electronic File: 13463660 9-15-16.pdf- 1/12/2017 Electronic File: Post Run 04 13463660.pdf' 1/12/2017 Electronic File: Post Run 10 13463660.pdf 1/12/2017 Electronic File: 15- 16CPB2—GR _ Res_ 24DEC2016_MD_FINAL_FIE , LD_BHI_CTK.cgm 1/12/2017 Electronic File: 15- 16CPB2—GR _ Res_ 24DEC2016_TVDSS_FI NAL_ FIELD_ BHI_CTK.cgm 1/12/2017 Electronic File: 15- 16CPB2_GR_Res _24DEC2016_MD_FINAL_FIE LD_BHI_CTK.pdf 1/12/2017 Electronic File: 15- 16CPB2_GR Res 24DEC2016_TVDSS_FINAL_ FIELD BHI CTK.pdf 1/12/2017 Electronic File: 15-16CPB2 Final Survey, Report.pdf 1/12/2017 Electronic File: 15-16CPB2 Final Survey ' Report.txt 1/12/2017 Electronic File: 15-16CPB2 Final Surveys.csv 1/12/2017 Electronic File: 15-16CPB2 Final Surveys.xls AOGCC Page 3 of 5 Monday, April 3, 2017 DATA SUBMITTAL COMPLIANCE REPORT 4/3/2017 Permit to Drill 2161540 Well Name/No. PRUDHOE BAY UNIT 15-16C MD 16145 TVD 8687 Completion Date 1/1/2017 ED C 27913 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data ED C 27913 Digital Data Log C 27913 Log Header Scans Well Cores/Samples Information: Name Interval Start Stop Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21115-03-00 Completion Status 1-0I1- Current Status 1-0I1- UIC No 0 1/12/2017 Electronic File: 15- 16CPB2_25_tapescan_BHI_CTK.txt ' 1/12/2017 Electronic File: 15- 16CPB2_5_tapescan_BHI_CTK.txt , 1/12/2017 Electronic File: 15-16CPB2_output.tap ' 1/12/2017 Electronic File: 15- 16CP62—GR _ Res_ 24DEC2016_MD_FINAL_FIE " LD BHI CTK.tif 1/12/2017 Electronic File: 15- 16CPB2_GR_Res 24DEC2016_TVDSS_FINAL_ FIELD BHI CTK.tif 0 2161540 PRUDHOE BAY UNIT 15-16C P132 LOG HEADERS Sample Set Sent Received Number Comments INFORMATION RECEIVED Completion Report OY Directional / Inclination Data C9 Mud Logs, Image Files, Digital Data Y /� Core Chips YNA Production Test Information�i NA Mechanical Integrity Test Information Y i N Composite Logs, Image, Data Files Core Photographs Y / A Geologic Markers/Tops O Daily Operations Summary O Cuttings Samples Y / U Laboratory Analyses Y(i N ) COMPLIANCE HISTORY Completion Date: 1/1/2017 Release Date: 11/17/2016 Description Date Comments: Comments AOGCC Page 4 of 5 Monday, April 3, 2017 DATA SUBMITTAL COMPLIANCE REPORT 4/3/2017 Permit to Drill 2161540 Well Name/No. PRUDHOE BAY UNIT 15-16C Operator BP EXPLORATION (ALASKA► INr API Nn sn-mo-,2iiir-nz-nn MD 16145 TVD 8687 Completion Date 1/1/2017 Compliance Revii Completion Status 1-0I1- Current Status 1-0I1- UIC No Date: AOGCC Page 5 of 5 Monday, April 3, 2017 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMI` N WELL ,OMPLETION OR RECOMPLETION REPO. -. AND LOG FEB 0 6 2017 1 � ��/� 77- , RBDMS FEB - P 2017 -i 7 1a. Well Status: Oil 0 Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1b. Well Class: 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One ' Development 0 Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2 Operator Name: 6. Date Comp., Susp., or Aband.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 1/1/2617 216-154 . 3. Address: 7. Date Spudded: k L 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 42f}9/i6�1fr 1418 h(D 50-029-21115-03-00 ° 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 12/28/2016 PBU 15-16C Surface: 854' FNL, 165' FWL, Sec. 22, T11N, R14E, UM Ref Elevations 9 KB 61.0 17. Field/Pool(s): Top of Productive Interval: 224' FSL, 4882' FWL, Sec. 10, T1 1N, R14E, UM GL 33.16 : BF 36.02 PRUDHOE BAY, PRUDHOE OIL Total Depth: 342' FSL, 2244' FWL, Sec. 10, T11N, R14E, UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: 16130'/ 8689' ADL 028306 ,. A6 i. 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. Land Use Permit: Surface: x- 676088 - y- 5960631, Zone - ASP 4 16145'/ 8687' ^ 78-084 TPI: x- 680641 y- 5967098 Zone - ASP 4 12. SSSV Depth (MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth: x- 678001 y- 5967153 Zone - ASP 4 None 1900' (Approx.) 5. Directional or Inclination Survey: Yes R1 (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Wndow Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) MD/TVD: • 13290' / 8671' ° 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD/GR/RES 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 29' 109' 29' 109' 30" 1910# Poleset 13-3/8" 72# L-80 28' 2495' 28' 2495' 17-1/2" 1900 sx Permafrost'E', 400 sx PF'C' 9-5/8" 47# L-80 25' 4587' 25' 4389' 12-1/4" 500 sx Class 'G', 300 sx PF'C' 7" 26# L-80 4440' 12396' 4287' 8223' 8-1/2" 174 sx Class'G' 4-1/2" 12.6# L-80 12217' 13290' 8076' 8671' 6-1/8" 413 sx Class'G' 3-1/2"x3-1/4" x2-7/8" 9.3# / 6.6# /6.5# L-80 12791' 16145' 8506' 8687' 4-1/4" 157 sx Class'G' 24. Open to production or injection? Yes 0 No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation GRADE Size and Number): DEPTH SET (MD) PACKER SET (MD/TV 4-1/2" 12.6# 13Cr85 12226' 12107'/ 7986' 2" Gun Diameter, 6 spf 15370'- 15600' 8709'- 8708' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 15666- 15735' 8708'- 8706' Was hydraulic fracturing used during completion? 15787'- 15828' 8705'- 8705' COMPLETION 15975'- 16129' 8704'- 8689' DATE Yes ❑ No 0 Per 20 AAC 25.283 (i)(2) attach electronic and printed 1 Lb I0�� information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED VERIFIED 2500' Freeze Protect w/ 38 Bbls Diesel 27. PRODUCTION TEST Date First Production: January 11, 2017 Method of Operation (Flowing, gas lift, etc.): Flowing Date of Test: 1/17/17 Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: 5 Test Period ­► 750 40699 0 64 54249 Flaw Tubing 885 Press Casinq Press: Calculated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity -API (corn: 1350 24 Hour Rate 156 8479 0 N/A Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAI only � ��/� 77- , RBDMS FEB - P 2017 -i 7 28. CORE DATA Conventional Core(s) Yes ❑ No B Sidewall Cores Yes ❑ No Q If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No 9 Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 13267' 8667' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. ZONE 1A 13267' 8667' Kicked off from Parent Well 13290' 8671' 15-16B Zone 1 B (Fault) 14146' 8684' Zone 1A 14695' 8711' Kavik 15894' 8706' Zone 1A (Invert) 15966' 8705' Formation at total depth: Zone 1A (From Base) 15966' 8705' 31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post -Rig Work, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Leemhuis, Jacob Email: Jacob.Leemhuis@bp.com Printed Name: Joe I astu <a Title: Drilling Technologist Signature: _T/ �% Phone: +1 907 564 4091 Date: INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only TREE = WELLHEAD= FMC ACTUATOR= DEV OKB. ELEV = _ 71.0' REF G_EV = _61' KOP 300_0' Max Angle = 96" @ 16072' Datum MD =�— — NA Datum TVD = 8800' SS 13-318" CSG, 72#, L-80, D = 12.347" H 2496' Minimum ID = 2.31" @ 12804' 2-7/8" X NIPPLE IN LTP 15-16C SAFI 40TES: WELL ANGLE > —70" @ 13032'. ***441.e" CHROME TBG***MAX DLS:25.1* @ 15129'. LL12-4 ------ 2230' 4-1/2" HES X NP, D = 3.813" GAS LFT MANDRJiS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3550 3531 18 MMG DOME RK 16 11/02/16 3 6987 5503 61 KBG2 DOME BK 16 11102/16 2 10590 7004 66 KBG2 DMY BK 0 04/09/10 1 12039 7930 35 KBG2 DMY BK 0 04/09/10 4444444V 9-5/8" X 7" ZXP LTP w ITEBACK SLV, D = 6.290" 4457' 1-19-5/8" X 7" BKR FLEXLOCK LNR HGR, D = 6.180" 9-5/8" WHIPSTOCK (03/21/10) 1 4687• 9-5/8" CSG, 47#, L-80 BTC, D = 8.681" —45$7• MLLOUT WINDOW (15-1613) 4587'-4604- 12073 4-1/2" HES X NP, ID= 3.813" 12108' —i7" X 4-1/2" HES TNT PKR D = 3.856" 12139' 4-1/2" HES X NP, D = 3.813" 4-1/2" TBG, 12.6#, 13CR-85 VAM TOP,12228' .0152 bpf, D = 3.958" 12216' 4-1/2" HES XN NP MILLED TO 3.80" (11127116) LNR, 26#, L-80 VAM TOP HC, PERFORATION SUMMARY �7- .0383 bpf,D = 6276" REF LOG: ON 3-1/2" X 3-3116" X 2-718" TOLIrOC 12801' ANGLE AT TOP PERF 88" @ 15370' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sgz SHOT SQZ 2" 6 15370 - 15600 O 12/31/16 12/31/01 CWP CTD SIDETRACK (15-16A?) 2" 6 15665- 15735 O 12/31/16 2" 6 15787 - 15828 O 12/31/16 01101/17 NORDIC2 CTDSIDETRACK(15-16C) 2" 6 15975 - 16129 O 12/31/16 LNR, 26#, L-80 VAM TOP HC, 12398' �7- .0383 bpf,D = 6276" 3-1/2" X 3-3116" X 2-718" TOLIrOC 12801' PRIDHOEBAY UNIT WELL: 15-16C PE AT ND:'2161540 AR No: 50-029-21115-03 SEC 22, TI I N, R14E, 854' R+L 8 165' FWL DATE REV BY CONWENTS 3-1/2" LNR 9.9#, L-80 STL, .0087 bpf, D = 2.992"13272" 06/30/84 ORIGINAL COMPLETION 4-1/2" KB PKR WHPSTOCK (12/18/16) 13289• 4-1/2" LNR, 12.6#, L-80 BT -M, 13289' .0152 bpf, D = 3.958' 12/31/01 CWP CTD SIDETRACK (15-16A?) 3-1/4" LNR 6-6#, L-80 TCI, -0079 bpf, D = 2.850" 13781' PBTD 1613W 2-7/8" LNR 6.5#, L-80 STL, .0058 bpf, D = 2.441" 16146' 12219' 7" X 5" HRD-E ZXPN LTP w (TEBACK SLV, D = 4.190" 12228' 4-112" WLEG, D = 3.958" 12235' 7" X 5" BKR FLEXLOCK LNR HGR D = 4340- 12246' 5" X 4-1/2" XO, D = 3.910" 12791' —i45KB BKR HY BRD LTP (02/02/17) 12801' 3.70" DE LOY SLV, D = 3-00" 12804' 2-7/8" X NP, ID = 2.31" 12822' 3-112" X NP, D = 2.812" 13272' 3-1/2" X 3-3/16" XO, D = 2.876- I MLLOUT WNDOW (15-16C) 1329U-13298' 13781' 3-3/16" X 2-7/8" XO, D = 2.377" 14262'PUP JT w IRA TAG PRIDHOEBAY UNIT WELL: 15-16C PE AT ND:'2161540 AR No: 50-029-21115-03 SEC 22, TI I N, R14E, 854' R+L 8 165' FWL DATE REV BY CONWENTS DATE REV BY COMM31ITS 06/30/84 ORIGINAL COMPLETION 01/05/17 JMD DR -G HO CORRECTIONS 11/18/90 LAST WORKOVER 01/09/17 JT/JMD RML ODEAPPROVAL 11/20101 CTD SIDETRACK (15-16?) 02/06117 JDMJMD SET HY BRD UP w /X NP (0210211 12/31/01 CWP CTD SIDETRACK (15-16A?) 04/01/10 WES CTD SIDETRACK (15-16B) BP Exploration (Alaska) 01101/17 NORDIC2 CTDSIDETRACK(15-16C) North America - ALASKA - BP Page 1 of 30 Operation Summary Report Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) - -(usft) 12/15/2016 21:30 00:00 2.50 MOB P PRE RIG WAS RELEASED FROM WELL C-31 C AT 21:30. PJSM WITH RIG CREW FOR MOVING OFF WELL WITH NO TWC IN PLACE. DISCUSS USE OF CHOCK BLOCK, STOP COMMAND, RADIO CHECKS AND ESD. JACK UP RIG AND MOVE OFF WELL WITH NO ISSUES. STAGE RIG NEAR ENTRANCE TO PAD. 'PICK UP MATS AROUND WELLAND CLEAN UP AREA. AROUND 23:00 START MOVING RIG FROM C -PAD TO DS -15. ROUTE IS OFF C -PAD, LEFT ON TWIN TOWERS ROAD, LEFT ON SPINE, LEFT ON OXBOW TO DS -15 ACCESS ROAD. 12/16/2016 100:00 07:30 7.50 MOB P PRE CONTINUE MOVING RIG FROM C -PAD TO DS -15. ROUTE IS OFF C -PAD, LEFT ON TWIN TOWERS ROAD, LEFT ON SPINE, LEFT ON OXBOW TO DS -15 ACCESS ROAD. 07:30 08:30 1.00 MOB P PRE RIG IS STAGED IN FRONT OF 15-16 WHILE WAITING ON APPROVAL OF WELL HANDOVER CERTIFICATE 08:30 13:00 4.50 MOB N WAIT PRE PLACE CREW ON STANDBY, HAVE DISCUSSION WITH ENTIRE RIG TEAM TO DISCUSS LOSS OF RIG CONTRACTAT COMPLETION OF WELL. ALLOW CREW TO MAKE CALLS TO FAMILIES, GATHER THOUGHTS, HAVE DISCUSSIONS WITH CREW REGARDING FOCUS, WATCHING OUT FOR EACH OTHER. CONDUCT GENERAL CLEANUP, RIG UP PREP WHILE CREW CONDUCTS FAMILY BUSINESS 13:00 14:00 1.00 MOB P PRE PJSM ON PLACING MATS AROUND TREE. LAY MATS, ALL GOOD. PJSM ON MOVING RIG OVER WELL. EMPHASIS ON COMMUNICATION, STOP COMMANDS (VISUAL, AUDIBLE), PLACEMENT OF 12" BY 12" BLOCK, WHO IS IN COMMAND OF FUNCTION OF ESD. -STAGE PERSONNEL, FUNCTION TEST ESD MOVE RIG OVER WELL. RIG ACCEPT 1400 HRS. 14:00 17:00 3.00 RIGU P PRE STAGE SUPPORT EQUIPMENTAROUND RIG SITE PREP TREE FOR OPERATIONS, INSTALL GAUGES. WSL WITNESS OPENING OF SSV. CYCLE TREE VALVES OPEN, 0 PSI ON TREE. PJSM ON LIFTING REEL INTO REELHOUSE. LIFT REEL, INSTALL. TEST ALL ALARMS LEAK TIGHT TEST TREE VALVES TO 3500 PSI, GOOD TEST. CONTINUE TO MONITOR TREE THROUGH SENSOR ON WING VALVE. 17:00 17:30 0.50 RIGU P PRE i CONDUCT RIG EVAC DRILL, FOLLOW WITH AAR Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America -ALASKA - BP Operation Summary Report Common Well Name: 15-16 1 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 22:000 4.50 RIGU P PRE CONTINUE WITH RIG UP OPERATIONS 22:00 - 23:00 23:00 - 00:00 12/17/2016 00:00 - 02:00 02:00 02:20 02:20 08:30 Page 2 of 30 I NU BOP AND RIG UP REEL FOR OPERATIONS CONCURRENTLY. INSTALL TEST PLUG. INSTALL BOPS. INSTALL CT 1502 LINE INSIDE REEL. INSTALL GRAPPLE. 1.00 RIGU P PREP TO PULL CT ACROSS. PRE CONDUCT PJSM WITH SLB AND NORDIC CREWS FOR PULLING CT ACROSS. DISCUSS DROPS, TETHERED TOOLS AND EXCLUSION ZONES. I PULL TEST GRAPPLE THEN REMOVE SHIPPING BAR FROM REEL. PULL CT ACROSS PIPE SHED ROOF AND INTO INJECTOR. 1.00 BOPSUR P PRE PREP FOR BOP TEST. REVIEW PROCEDURE, CONDUCT PJSM. PRE CONTINUE PREP FOR BOP TEST. 2.00 BOPSUR P GET TEST JTS READY, GREASE CHOKE MANIFOLD, FILL LINES WITH WATER. BLOW AIR ACROSS STACK TO PUSH EXCESS GREASE OUT. SHELL TEST BOPS. FIND LEAK ON DOOR SEAL, REPLACE SEAL. RE -TEST, GOOD. P 0.33 SOPSUR PRE CONDUCT RIG EVAC EXERCISE WITH NIGHT SHIFT. ALL PERSONS MUSTER AND ACCOUNTED FOR IN 2 MIN. CONDUCT AAR AFTERWARDS. P 6.17 BOPSUR PRE CONTINUE WITH BOP TEST. TEST BOPE TO 250 PSI LOW, 3,500 PSI HIGH FOR 5 MINUTES EACH - TEST ANNULAR AND VBR WITH 2-3/8" AND 3-1/2"" TEST JOINTS -ALL TESTS CHARTED, SEE ATTACHED BOP TEST CHARTS TEST WITNESSED BYAOGCC REP CHUCK SCHEIVE, WSLAND TOURPUSHER. i BOP CONFIGURATION FROM TOP DOWN- -ANNULAR BLIND / SHEARS 2-3/8" PIPE/ SLIP FLOW CROSS 2-3/8" X 3-1/2" VBR 2-3/8" PIPE / SLIP CONDUCT DRAWDOWN TESTAS PER BP AND AOGCC REGS. 08:30 - 09:45 1.25 BOPSUR P PRE CLEAR AND CLEAN RIG FLOOR. PREP SURFACE LINES FOR TESTING INJECTOR. PICK UP INJECTOR, STAB ON WITH INJECTOR. PRESSURE TEST PACKOFFS, PRESSURE BULKHEAD, AND INNER REEL IRON TO 250 PSI LOW/ 3500 PSI HIGH. GOOD ITEST. 09:45 10.30 0.75 RIGU P PRE DRILL SITE MAINTENANCE CREW ON LOCATION TO TEST TORQUE ON TREE. INSPECT ALL TREE BOLTS, GOOD TOGO. Printed 1/9/2017 10:08:19AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 3 of 30 Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 1 End Date: 12/28/2016 IX3-0186W-C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations —(h r) I (usft) 110:30 - 17:00 6.50 RIGU P PRE CIRCULATE HOT FRESH WATER AROUND, REVERSE CIRCULATE TO PUMP SLACK BACK. i - POP OFF. RU COIL CUTTER, CUT 355' COIL. RD CUTTER. PREP COIL END, MU CONNECTOR, PULL TEST CONNECTOR TO '40K. PRESSURE TEST REELHOUSE IRON, COIL, I AND COIL CONNECTOR TO 250 PSI LOW/ 4700 PSI HIGH. GOOD TEST. BLOW BACK REEL WITH AIR, STAND INJECTOR TO SIDE AND PULL BOP TEST PLUG. CLEAR AND CLEAN RIG FLOOR 17:00 18:00 1.00 RIGU P PRE ' PJSM WITH VALVE CREW ON MOBILIZING LUBRICATOR TO RIG FLOOR. VALVE CREW VERIFIED TREE HEIGHT MEASUREMENTS MOBILIZE LUBRICATOR TO FLOOR 18:00 - 19:00 1.00 RIGU P PRE SHIFT CHANGE AND RIG CHECKS. OFFLOAD FRESH WATER FROM PITS AND LOAD KCL. 119:00 21:00 2.00 BOPSUR P PRE PJSM WITH NORDIC CREWAND BPV CREW FOR PT OF LUBRICATOR. REVIEW PROCEDURE FOR PULLING BPV. LOW PRESSURE TEST SHOWS 20 PSI INCREASE IN 5 MIN DUE TO THERMAL EFFECTS, USING MEOH FROM OUTSIDE TANK (10 DEG F) BRINGING IT ONTO THE RIG FLOOR LUBRICATOR ABOUT 60 DEG, AFTER 2 BLEEDOFFS PRESSURE LEVELS OUT, TEST 250 / 3,500 PSI GOOD. I OPEN TREE VALVE, RETRIEVE BPV. ZERO PRESSURE ON WELL. PURGE LUBRICATOR WITH MEOH THEN LIFT OFF, BPV HAS BEEN RECOVERED. OFFLOAD BPV LUBRICATOR AND PULLING TOOLS. 21:00 22:20 1.33 RIGUP PRE INSTALL BHI CABLE HEAD. ELECTRICAL TEST IS GOOD. MOVE INJECTOR OFF TO SIDE, PREP FOR BULLHEADING. 22:20 00:00 1.67 RIGU P PRE CONDUCT PJSM FOR BULLHEADING WELL. REVIEW PUMP SCHEDULE. DRILLER AND WSL REVIEW PRESSURE CROSSCHECK VERIFICATION. BULLHEAD WELLAS PER WELL PLAN. PUMP 5 BBLS MEOH, 400 BBLS 1% KCL, 40 BBLS HI -VIS KCL, 220 BBLS MUD. KEEP PUMP RATE AROUND 5.0 BPM WHILE — BULLHEADING. 12/18/2016 00:00 01:10 1.17 RIGU P PRE CONTINUE BULLHEADING WELLAS PER WELL PLAN. PUMP 5 BBLS MEOH, 400 BBLS 1 % KCL, 40 I BBLS HI -VIS KCL, 220 BBLS MUD. KEEP PUMP RATE AROUND 5.0 BPM WHILE BULLHEADING. BLEED IA ONCE FROM 200 PSI TO 0. Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths' Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 4 of 30 Operation Summary Report Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth ! Phase Description of Operations - (hr) _ (usft) 01:10 - 02:00 0.83 RIGU P PRE SHUT DOWN PUMP, LEAVE WELL SHUT IN AND OBSERVE PRESSURE. LOAD BTT EQUIPMENT ONTO RIG AND ASSEMBLE WHIPSTOCK. DISPLACE WATER OUT OF REEL WITH MUD. AFTER 40 MIN WHP HAS BLED DOWN TO 20 PSI. 1 LINE UP TO BLEED OFF REMAINING PRESSURE THROUGH MGS. PURGE RISER WITH MUD THEN REMOVE - - NIGHT-CAP. 02:00 02:45 0.75 RIGU P PRE REMOVE NIGHTCAP AND MONITOR WELL, FLUID LEVEL IS OBSERVED DROPPING VERY SLOWLY. LIFT UP INJECTOR FOR PT OF BHI CABLE HEAD AND CHECK VALVES. PRESSURE TEST TO 250 / 3,500 PSI, GOOD. 02:45 03:10 0.42 STWHIP P WEXIT MAKE UP WHIPSTOCK BHA#1 SURFACE TESTED COILTRAK TOOL. GOOD TEST. - PRESSURE TEST QTS TO 300 PSI LOW FOR 5 MINUTES / 3,500 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 03:10 03:10 06:00 2.83 STWHIP P WEXIT RIH WITH WHIPSTOCK BHA#1 RATE: 0.57 BPM IN, 0.87 BPM OUT. CIRC PRESSURE: 1,300 PSI MUD WEIGHT: 9.55 PPG IN, 9.58 PPG OUT RETURNS DIMINISHING AS THE BHA APPROACHES THE PERFORATIONS. 06:00 - 08:452.75 STWHIP P WEXIT LOG DOWN FOR TIE-IN FROM 12,800' TO FORMATION WITH -12' CORRECTION LOSSES AVERAGING 24 BPH AT LOGGING COMPLETION AND WHILE PICKING BACK UP FOR CCL PICK BACK UPAND LOG DOWN WITH CCL. _ LOSSES OF 27 BPH WHILE LOGGING DOWN. 08:45 09:15 0.50 i STWHIP P WEXIT PICK UP TO WHIPSTOCK SET POINT WHILE LOGS ARE BEING READ. LOGS GOOD, PICK STRING UP TO NEUTRAL. SET WHIPSTOCK TOP AT 13,286' WITH 315° ORIENTATION. SHEAREDAT3000PSI. SET DOWN WITH 6K, GOOD SET. PICK UPABOVE WHIPSTOCK, FLOW CHECK FOR 10 MINUTES. 09:15 11:50 2.58 STWHIP P WEXIT FLOW CHECK GOOD, POH WITH BHA. LOSSES HAVE STOPPED WITH SETTING OF WHIPSTOCK PACKER. 1.71 BPM IN, 1.37 BPM OUT WHILE POH AT 60 FPM. MW IN 9.56 PPG, MW OUT 9.53 PPG PJSM FOR FLOW CHECK AND LAYING DOWN BHA WHILE POH. PULL BHA TO BELOW BOP, FLOW CHECK. FLOW CHECK IS NO FLOW, GOOD CHECK. _- POP OFF WITH INJECTOR AT 1150 HRS Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 5 of 30 Common Well Name: 15-16 -- - - - AFE-No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project. Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:00AM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) _ 11:50 - 13:30 1.67 STWHIP P WEXIT STAND INJECTOR TO SIDE. LAY DOWN BHA. MOBILIZE BHI TOOLS TO RIG FLOOR (SPARES) WHILE FLUSHING MUD GAS SEPARATOR WITH FRESH WATER INSPECT INJECTOR COMPONENTS WHILE PREPARING TO PRESSURE TEST QTS FOR OPENING UP TO WELL. NOTICE THAT PACKOFFS CASE HAS LARGE GAP, INDICATING ABNORMAL PACKOFF WEAR. 13:30 16:40 3.17 STWHIP N SFAL WEXIT OPEN DOORS AND INSPECT PACKOFFS. ! PACKOFFS WORN THROUGH AFTER ONE RUN INTO WELL OF -14,100' (NORMAL RUN FOOTAGE IS 100-125K RUNNING FEET ON A SET OF PACKOFFS). CHANGE OUT PACKOFFS ON INJECTOR. STAB ON WITH INJECTOR AND PRESSURE TEST TO 250 PSI LOW/ 3500 PSI HIGH. GOOD TESTAGAINST PACKOFFS. SEE TRACTION REPORT NUMBER 2016 -IR -5393941 FOR FULL REPORT LINE UP AND CONDUCT PROACTIVE TEST AGAINST BHI FLOAT ASSEMBLY DUE TO CONCERNS OF DEBRIS. PASSED PRESSURE TEST TO 250 PSI LOW BUT COULD NOT HOLD AGAINST HIGH PRESSURE TEST TO 3500 PSI. CLOSE IN VALVES, MONITOR THROUGH WING VALVE. POP OFF AND CHANGE OUT FLOAT ASSEMBLIES IN UPPER QUICK CONNECT. FLOATS ASSEMBLIES HAVE STICKY COATING 'ON THEM AND DEBRIS CAUGHT IN THE SPRINGS BUT IT DOESN'T SEEM TO BE THE RUBBER FROM THE PACKOFFS. MU TEST SUB TO UQC AND TEST TO 250 PSI LOW/ 3500 PSI HIGH WITH A GOOD TEST RESULT. - OPEN WELL UP TO TESTED LUBRICATOR CAP. NO PRESSURE, OPEN CHOKE WITH _ GOOD NO FLOW. 1 16:40 - 17:15 0.58 STWHIP P WEXIT - PJSM FOR MAKING UP BHA. MU BHA# 2 - 3.80" WHIPSTOCK MILLING BHA PER WELL PROGRAM. MILLS GAUGE: STRING MILL NO-GO AT 3.80" AND DIAMOND SPEED WINDOW MILL NO-GO AT 3.79", 3.80" GO _ -STAB ON WITH INJECTOR 17:15 - 20:40 3.42 STWHIP P WEXIT 'TEST QUICK TEST SUB WHILE MWD TOOLS ARE BEING POWERED UP BREAK CIRCULATION, RIH WITH 3.80" MILLING BHA#2 MUD WEIGHT: 9.53 PPG IN, 9.56 PPG OUT LOG DOWN FOR TIE-IN FROM 12,800' MD (FORMATION) WITH -14.5' CORRECTION. UP WEIGHT AT 13,200' IS 51KLBS. CLOSE EDC, EASE DOWN AND DRY TAG AT 13,287'. Printed 1/9/2017 10:08:19AM `All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Common Well Name: 15-16 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 - - -- - Project: Prudhoe Bay Site: PB DS 15 � AFE No K3 -0186W -C: (2,544,339.00) Page 6 of 30 Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task77� Code NPT NPT Depth Phase Description of Operations -- 20:40 00:00 3.33 STWHIP P - -. 1 WEXIT START TIME MILLING AT 13,287'. OUT MM GETS RESRICTED AS SOON AS THE PUMP IS BOUGHT UP TO 2.8 BPM. MILL 3.80" WINDOW IN 4-1/2" CASING/LINER PER BAKER REP FROM 13,287' MD TO 13,290.5' MD RATE: 2.84 BPM IN, 2.84 BPM OUT - MUD WEIGHT: 9.60 PPG IN, 9.54 PPG OUT - DWOB: 1 - 4 KLBS CIRC PRESSURE: 3,450 - 3,600 PSI BLEED IA FROM 300 PSI TO ZERO AROUND MIDNIGHT. 12/19/2016 00:00 - 05:20 5.33 STWHIP P WEXIT CONTINUE MILLING 3.80" WINDOW FROM 13,290.5' TO 13,295.5' AS PER BTT REP AND WELL PLAN. MILL WINDOWAT 1 FT/HR WHENEVER DWOB ALLOWS. CONTINUE 1 FT/HR THROUGH MIDPOINTAND LOWER PART OF WINDOW. RATE: 2.82 BPM IN, 2.83 BPM OUT MUD WEIGHT: 9.58 PPG IN, 9.52 PPG OUT DWOB: 1 - 2 KLBS CIRC PRESSURE: 3,400 PSI BLEED IA FROM 300 PSI TO ZERO AT 05:20. 05:20 07:00 1.67 STWHIP P MILL 3.80" WINDOW IN 4-1/2" CASING PER WEXIT BAKER REP FROM 13,295.5' RATE: 2.83 BPM IN, 2.84 BPM OUT MUD WEIGHT: 9.58 PPG IN, 9.52 PPG OUT DWOB: .55 - 3 KLBS CIRC PRESSURE: 3,400 - 3,550 PSI CIRCULATION PRESSURES AND WOB DID P OFF, EXITED WINDOWAT 13,296'. 07:00 08:15 1.25 STWHIP P LAHEAD IN 3.80" RATHOLE FROM I 97'TO 13,309' TE: 2.83 BPM IN, 2.82 BPM OUT. CIRC SSURE: 3420 - 3710 PSI CROMOTION MUD WEIGHT: 9.56 PPG IN, 9.51 PPG OUT, ECD: 11.05 PPG WOB: 1.3 - 4.5 KLBS 08:15 09:45 1.50 T- STWHIP P WEXIT REAM WINDOW PERFORM 3 REAMING PASSES AT 17MIN. VERY SLIGHT BOBBLES IN MOTOR WORK, WINDOW LOOKS CLEAN. RATE: 2.79 BPM IN 2.81 BPM OUT U PU: 42-43 KLBS, SO: 15-16K KLBS I SHUT DOWN PUMPS, DRY DRIFT WINDOW IRCULATED DOWN HI -VIS SWEEP JUST PCRIOR TO REAMING WINDOWANDAGAIN WITH REAMING COMPLETE. NO CHANGE WITH RETURN OF FIRST SWEEP WHILE MAKING REAM PASSES. 09:45 12:30 2.75 STWHIP P WEXIT FLOW CHECK OFF BOTTOM, ALL GOOD. WELL STATIC. POH WITH BHA. NO SIGNIFICANT DIFFERENCE ACROSS SHAKERS WITH RETURN OF SWEEP. - PJSM FOR FLOW CHECK AND LAYING DOWN BHA WHILE POH. PULL BHA TO BELOW BOP STACK. FLOW CHECK, ALL GOOD WITH NO FLOW. PULL BHA INTO INJECTOR. POP OFF WITH - ( INJECTOR. Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 'X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT (hr) 12:30 13:45 1.25 DRILL P 1345 - 17:00 3.25 DRILL P 17:00 20'50 3.83 t DRILL P I i 20:50 21:25 0.58 DRILL P 21:25 00:00 2.58 DRILL P 12/20/2016 00:00 01:00 1.00 DRILL P 01:00 - 02:20 1.33 DRILL P Page 7 of 30 NPT Depth Phase I Description of Operations (usft) PROD1 BLOW DOWN BHAAND LAY DOWN. MILLS IN GOOD CONDITION, WINDOW MILL 3.79" NO-GO, 3.80" GO, STRING REAMER MILL 3.80" NO-GO, 3.81" GO. OFFLOAD BOT TOOLS MU BHA #3: NEW PROTOTYPE HUGHES P-78 BIT MADE UP TO 2.1' BEND MOTOR AND BHI SMART TOOLS WITH RESISTIVITY - STAB ON WITH INJECTOR PROD1 PRESSURE TEST QTS WHILE MWD TOOLS ARE POWERED UP AND EDC OPENED. BREAK CIRCULATION, RIH WITH BHA. LOG TIE-IN WITH -16' CORRECTION CONTINUE TO RIH. SLACK OFF WEIGHT RUNNING IN CASED HOLE 17 K. _LNO ISSUES_ PASSING THROUGH WINDOW PROD1 DRILL 4.25" BUILD SECTION FROM 13,309' MD TO 13,640' MD FREE SPIN: 3670 PSI, 2.85 BPM RATE: 2.88 BPM IN, 2.88 BPM OUT, CIRC PRESSURE: 3,800 - 3,900 psi, ECD: 11.24 PPG ROP: 123 FT/HR, WOB: 1 - 2 KLBS PUMP 10 BBLS LO / HI VIS SWEEPS iAROUND. AT 13,500' PULL 100' WIPER. CLEAN PASS UP AND DOWN. - SWEEPS DO NOT RETURN MUCH _ ADDITIONAL CUTTINGS, PROD1 HAVE REACHED THE BUILD SECTION OBJECTIVES AT 13,640'. PUMP LO / HI VIS SWEEPS OUT THEN PERFORM DYNAMIC FLOW CHECK. - 10 MIN DYNAMIC FLOW CHECK IS GOOD, 0.49 BPM IN / 0.44 BPM OUT WHILE POOH AT 3 FT/MIN. MUD WEIGHT: 9.52 PPG IN / 9.62 PPG OUT. PULL THROUGH WINDOW WITH NO ISSUES AT 25 FT/MIN, 45L, 0.5 BPM. PROD1 PULL THROUGH WINDOWAND OPEN EDC. RUN BACK IN AND JET WHIPSTOCK TRAY ,WITH OPEN EDC. POOH TO SURFACE. MUD WEIGHT: 9.61 PPG IN, 9.62 PPG OUT RATE: 3.86 BPM IN, 3.68 BPM OUT OPEN EDC, POH FROM WINDOW. - RATE: 3.87 BPM. CIRC PRESSURE: 4,100 PSI PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: 'STATIC CLOSE EDC, POWER DOWN INJECTOR OFF: 00:15 -BIT IS 1-1 WILL RE -RUN. UD BHA. PROD1 PJSM FOR CUTAND SLIP DRILL LINE. REVIEW PROCEDURE AND PERMITS WITH NORDIC CREWS. SLIP AND CUT 50' OF DRILLING LINE. Printed 1/9/2017 10:08:19AM 'All depths reported in Drillers Depths* North America - ALASKA - BP Page 8 of 30 Operation Summary Report Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task -- - _ (hr) -� 0220 0245 0.42 DRILI 02:45 - 06:30 3.75DRILL 06:30 - 06:55 0.42 DRILL 0655 - 10:50 3.92 DRILL 10:50 - 11:10 !i 0.33 DRILL Code NPT 1 NPT DepTZ 'ase (usft) P OD1 P PROD1 P PROD1 N STUC 13,679.00 PROD1 i I I P — PROD1 Printed 1/9/2017 10:08:19AM "All depths reported in Drillers Depths" Description of Operations MAKE UP 3.0" DRILLING BHA #4 - PICK UP 2-7/8" ULS MOTOR (1.15 DEG AKO) AND 3" COILTRAK TOOLS '- MAKE UP 3.75 X 4.25" HCC BICENTER BIT -SURFACE TESTED COILTRAK TOOL. GOOD TEST. - PRESSURE TEST QTS TO 300 PSI LOW FOR 5 MINUTES / 3,700 PSI HIGH FOR 5 MINUTES, GOOD TEST. - INJECTOR ON: 02:45 RIH WITH 3.0" DRILLING BHA #4 FROM SURFACE. - RATE: 0.86 BPM IN, 1.39 BPM OUT. CIRC PRESSURE: 1,070 PSI MUD WEIGHT: 9.50 PPG IN, 9.55 PPG OUT LOG DOWN FOR TIE-IN FROM 12,810' TO FORMATION WITH -17' CORRECTION DRILL 4.25" BUILD SECTION FROM 13,640' MD TO 13,679' MD FREE SPIN: 3680 PSI, 2.83 BPM RATE: 2.84-2.98 BPM IN, 2.88-3.0 BPM OUT. CIRC PRESSURE: 3,890 - 4,130PSI, ECD: 11.23 PPG ROP: 85-100 FT/HR, WOB: 1.75 - 4.0 KLBS DRILLING AHEAD, PICKUP WITH WEIGHT DROP OFF AND CAN'T MOVE PIPE. WORK TO FREE PIPE. TAKING WEIGHT ON THE DPS (STICKING MECHANISM IS AT BHA) BUTABLE TO MOVE ORIENTER AND GAIN FULL RETURNS WHILE PUMPING. - CIRCULATE PER WELL PLAN TO CLEAN WELLBORE, ATTEMPT TO PULL, NO-GO. COME DOWN ON PUMPS TO REDUCE ECD, DROPPED FROM 11.25 PPG TO 9.4 PPG. ATTEMPTED PULL, NO MOVEMENT. - MINERAL OIL BACKED IN, WAITING ON CLEAN TRUCK FOR FLUID MOVEMENT TO BUILD KCL SPACER, ALLOW FOR ROOM FOR PILLS IN PITS - TRUCKING ON LOCATION, MOVE FLUIDS AROUND, BUILD KCL SPACER. MAKE SEVERALATTEMPTS TO MOVE PIPE WHILE COORDINATING THESE ACTIVITIES. - CIRCULATE DOWN MINERAL OIL ENCAPSULATED IN KCL SPACER PILLS. CIRC DOWN, STAGE MINERAL OIL OUTSIDE OF BHAAND LET SOAK. - FREE ON FIRST PICKUPATTEM_PT. DRILL DOWN WHILE CIRCULATING REMAINDER OF MINERAL OILAND KCL SPACER PILL OUT OF COILAND ABOVE BHA. - DRILLAT 2.85 BPM, 3620 PSI, WOB OF 1.3 K WITH 85-90 FPH ROP. - CONDUCT BHA WIPER WITH MIXED FLUIDS ABOVE BHA North America - ALASKA - BP Operation Summary Report Page 9 of 30 Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 'X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth i Phase Description of Operations - — ! (hr) (usft) 11:10 13:45 2.58 DRILL P PROD1 DRILL 4.25" BUILD SECTION FROM 13,679' MD TO 13,797' MD FREE SPIN: 3580 PSI, 2.85 BPM RATE: 2.84-2.95 BPM IN, 2.88-2.91 BPM OUT. CIRC PRESSURE: 3,735 - 4,105 PSI, MW IN 9.57 PPG, MW OUT 9.52, ECD 10.73 WITH MINERAL OILAND KCL SPACERS, ROSE TO 11.35 PPG WITH CLEAN MUD ALL THE WAY AROUND INITIAL ROP OF 75-100 FT/HR DROPPED DOWN TO 40-45 FPH IN SHALE INTERVAL, WOB: 1.60 - 2.20 KLBS RETURNS ARE GOOD FROM NORMAL CIRCULATION, NOTANGULAR, MORE SMOOTH INDICATING THEY MAY BE HANGING LOW SIDE AND ROLLING 13:45 16:15 2.50 DRILL P PROD1 CONDUCT WIPER UP TO WINDOW. RATE IN 2.95 BPM, RATE OUT 2.79 BPM, CIRC PRESSURE OF 3790 PSI ENTER INTO WINDOW, TIME LO -VIS SWEEP WITH WINDOW AND THEN CHASE LO -VIS I SWEEP UP HOLE INITIAL ECD OF 11.35 PPG, ECD 11.14 PPG AFTER SWEEP WITH BOTTOMS UP CUTTINGS VOLUME IS SLIGHTLY INCREASED; CUTTINGS ARE NOW SLIGHTLY LARGER AND ANGULAR VERSUS FINE AND SMOOTH TURN AROUND AND RIH AT 100 FPM TO "FLUSH" TUBING, GOOD INCREASE IN VOLUME OF RETURNS LOG PAST RA TAG WITH +3.5' CORRECTION Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 10 of 30 j Common Well Name: 15-16 i AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM i Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations -_ (hr) - (usft) - 16:15 20:00 3.75 DRILL P PROD1 - - - LOG DOWN FOR MAD PASS TO TIE IN INFORMATION FROM WORKING PIPE EARLIER IN DAY. RUN TO BOTTOM TO DRILL AHEAD. DRILL 4.25" BUILD SECTION FROM 13,797' MD TO 13,XX' MD FREE SPIN: 3700 PSI, 2.85 BPM RATE: 2.81-2.85 BPM IN, 2.78-2.84 BPM OUT. CIRC PRESSURE: 3,840 - 4,000 PSI, - MW IN 9.57 PPG, MW OUT 9.55, ECD OF 11.35 PPG - PRIMARILY SHALE INTERVAL WITH VARYING ROP OF 75-110 FT/HR WOB: 1.85 - 2.90 KLBS RETURNS HAVE BEEN CONSISTENT AND ANGULAR FEEL INDICATES MOVING UP HOLE, NOT ROLLING ON BOTTOM. LEL INDICATED 1% ON 3 SEPARATE SHORT INTERVALS OVER 30 MINUTE PERIOD. COINCIDED WITH PICKUP OF COIL DURING NORMAL DRILLING OPERATIONS. HANDHELD SHOWS 0% READING. WELL IS ON 1-2 BPH LOSSES AND DENSITIES, OUT RATESARE GOOD. RIG ELECTRICIAN ON WAY OUT TO DOUBLE-CHECK SENSORS. -WEIGHT HAS GONE FROM BEING CONSISTENTLY 11-12K DOWN WEIGHT TO -6 TO -12 DOWN WeIGHT WHILE DRILLING, PICKUPS ARE 5-10K OVER AVERAGE PICKUP WEIGHT OF 52K EARLIER IN THE DAY. - HAVE DRILLED FOR GEOLOGICAL DIAGNOSIS. GEOLOGIST CALLED TD AT 13,982' DUE TO LACK INDICATION OF PRODUCTIVE SAND IN OVER 200' OF DRILLING START LO -VIS / HI -VIS COMBO DOWN, PULL FOR 100' WIPER AND GO BACK TO BOTOM. CONDUCT DYNAMIC FLOW CHECK AT BOTTOM, .60 BPM IN AND .55 BPM OUT, MW IN 9.58 PPG, MW OUT 9.60 PPG. FLOW - -- CHECK GOOD. 20:00 23:00 3.00 DRILL N DPRB 13,982.00 PROD1 POH WITH DRILLING BHA. - SENSORS HAVE BEEN CALIBRATED, ALL READING 0% LEL. JETACROSS THE WHIPSTOCK TRAY WITH EDC OPEN - CONTINUE TO POH WITH EDC OPEN AND CIRCULATING AT MAX RATE. CIRCULATEAT 13.77 BPM, 4110 PSI, 23:00 00:00 1.00 DRILL N DPRB 13,982.00 PROD1 PERFORM FLOW CHECK, WELL STATIC -BREAK DOWN AND BLOW DOWN BHA, PREPARE TO MAKE UP BILLET ASSEMBLY 12/21/2016 00:00 00:30 0.50 DRILL N DPRB 13,982.00 PROD1 MAKE UP BILLET SETTING BHA#5 SURFACE TESTED TOOL. GOOD TEST. PRESSURE TEST QTS TO 300PSI LOW FOR 5 MINUTES / 3800 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 00:30 Printed 1/9/2017 10:08:19AM `All depths reported in Drillers Depths* North America - ALASKA - BP Page 11 of 30 Operation Summary Report Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 1 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations - -' (hr) (usft) 00:30 04:30 4.00 DRILL N DPRB 13,982.00 PROD1 RIH WITH BILLET PER OCN#1 RATE: 0.52 BPM IN, 0.94 BPM OUT. CIRC PRESSURE: 900-1479 PSI MUD WEIGHT: 9.49 PPG IN, 9.51 PPG OUT LOG DOWN FOR TIE-IN FROM 12,820' TO 12843' MD (FORMATION) WITH -11' CORRECTION RIH ABOVE WINDOW, PERFORM WEIGHT CHECK OF 46K / CLOSE EDC RIH TO SET DEPTH OF 13610'@ 0° PICK UP TO JUST BELOW BREAKOVER. SHEAR OUT AT 4500# STACK 6K DOWN. BILLET SET. 04:30 07:10 2.67 DRILL N DPRB 13,982.00 PROD1 MONITOR WELL FOR 10 MINUTES: STATIC 07:10 07:40 07:40 11:15 MUD WEIGHT: 9.50 PPG IN, 9.54 PPG OUT RATE: 1.51 BPM IN, 1.00 BPM OUT OPEN EDC, CIRC AT MAX RATE TO SURFACE PJSM ON TRIP OUT OF HOLE FOR FLOW CHECK, LAYING DOWN BHA FLOW CHECK WITH BHA BELOW BOP STACK, FLOW CHECK GOOD. WELL ON VERY SLIGHT LOSSES. PULL BHA INTO BOP STACK, POP OFF WITH - - - - — - — INJECTOR 0.50 DRILL N DPRB 13,982.00 PROD1 BREAK OFF BHA. LAY DOWN UPPER BHA. MOBILIZE BILLET RUNNING TOOL OFF OF RIG. CLEAR AND CLEAN RIG FLOOR, 3.58 DRILL N DPRB 13,982.00 PROD1 RU COIL CUTTER CUT 1 00'OF COIL FOR CHROME MANAGEMENT REQUIREMENT. PREPAND INSTALL CONNECTOR, PULL TEST TO 44K. RE -HEAD WITH BHI UQC. PRESSURE TEST FLOAT ASSEMBLY TO 250 PSI LOW / 3500 PSI HIGH. GOOD PRESSURE TEST. MU BHA #6:4.25" HCC BIT ONTO MOTOR WITH 1.15° BEND AND BHI SMART TOOLS. STAB ON TO WELL. Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America -ALASKA - BP Operation Summary Report Page 12 of 30 Common Well Name: 15-16 - - -- - - - AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor. NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations - (hr) - (usft) - -- - - 11:15 15:00 3.75 DRILL N RREP 13,982.00 PROD1 - PRESSURE TEST QUICK TEST SUB WHILE MWD TOOLS ARE POWERED UP, EDC iOPENED. BREAK CIRCULATION RIH WITH BHA NOTIFIED AT 1300 HRS THAT DURING A NORMAL WALK AROUND INSPECTION SLIGHT TRACE OF FLUID WAS IN RESERVOIR BELOW A PUMP LINER SWAB. DRILLER WAS NOTIFIED AND DETERMINED THAT ALTHOUGH STILL OPERATIONAL, SWAB WILL FAIL IN NEAR TIME. DRILLER NOTIFIED TOOLPUSHER AND WSL. IMMEDIATELY BEGAN PREPARATION TO REPLACE ALL 3 SWABS ON THAT PUMP. CONTINUING TO RIH ON PUMP 1 WHILE RIG CREW WORKS ON PUMP 2. LOG DOWN FOR PRIMARY TIE IN WITH -18' CORRECTION. CONTINUE TO RIH TO PLACE BHA JUST ABOVE WINDOW EXIT. SWABS HAVE BEEN REPLACED. CONDUCT FUNCTION TEST, ALL GOOD. CONDUCT PRESSURE TEST TO 4000 PSI WITH GOOD TEST. CONTINUE RIH DOWN TO BILLET WITH NO - - ISSUES 15:00 19:00 4.00 STKOH N DPRB 13,982 00 PROD1 RIH, TAG UPON BILLET AT 13,613' DRY TAG. PICK UP, MOVE DOWN, NO INDICATIONS THAT BIT IS ON BILLET, SLOWLY CREEP DOWN. FINALLY SEEING POSITIVE INDICATIONS OF MOTORWORK ON BILLETAT 13,611'. - FREE SPIN OF 3700 PSI AT 2.82 BPM, SLACK OFF WEIGHT 17K WHILE CREEPING DOWN. -KICKOFF BILLET AT 0° ORIENTATION. MILL AT 2.80-2.85 BPM, 3655-3780 PSI, .95-2.1.0 K WOB SLACK OFF WEIGHT OF 14-17K, MW IN 9.54 PPG, MW OUT 9.49 PPG SLIGHT LOSSES OF -2 BPH ATTRIBUTED TO FORMATION OBSERVING QUITE A BIT OF ALUMINUM ACROSS SHAKER, BELIEVE TO BE PAST BILLETAT 13,614'. PUMP DOWN HI -VIS PILL. SUCCESSFUL KICK OFF SWAP OVER TO - _ 15-16C RON 19:00 00:00 5.00 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 13610' MD TO 14035' - FREE SPIN: 3700 PSI, 2.80 BPM RATE: 2.80 BPM IN, 2.80 BPM OUT. CIRC PRESSURE: 3700 - 4200 PSI - MUD WEIGHT: 9.56 PPG IN, 9.60 PPG OUT, ECD: 11.37 PPG ROP: 100-150 FT/HR, WOB: 2.5 - 3.0 KLBS PERFORM WIPER TO WINDOW, OPEN EDC, PUMP BOTTOMS UP LOG TIE IN TO RA WITH A+4.5' CORRECTION Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 13 of 30 Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-166 @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/22/2016 00:00 - 02:00 2.00 DRILL P PROD1 I DRILL 4-1/4" LATERAL FROM 14035' MD TO 14200' MD FREE SPIN: 3800 PSI, 2.80 BPM RATE: 2.80 BPM IN, 2.80 BPM OUT. CIRC PRESSURE: 3800-4200 PSI MUD WEIGHT: 9.59 PPG IN, 9.60 PPG OUT, ECD: 11.50PPG -' ROP: 100-150 FT/ HR, WOB: 2.0 — 3.0 KLBS 02:00 - 04:00 2.00 DRILL N RREP 14,200.00 PROD1 DURING WALK AROUND CREW MEMBER NOTICE SWAB LEAKING ON MUD PUMP#2 SHUT DOWN AND SWAPPED MUD PUMPS. 'PULL TO WINDOW. LO/TO MUD PUMP. REPAIR PUMP WHILE CIRCULATING AT WINDOW. PRESSURE TEST PUMP. CLOSE EDC. RUN BACK TO BOTTOM. '04:00 06:00 2.00 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 14,200' MD TO 14500' - FREE SPIN: 3800 PSI, 2.81 BPM RATE: 2.81 BPM IN, 2.81 BPM OUT. CIRC PRESSURE: 3800 — 4300PSI MUD WEIGHT: 9.60 PPG IN, 9.53 PPG OUT, ECD: 11.39 PPG -. ROP: 180 FT/HR, WOB: 2.5— 3.5 KLBS 06:00 07:45 1.75 DRILL P PROD1 i DRILL 4-1/4" LATERAL FROM 14,500' MD TO 14,654' - FREE SPIN: 3800 PSI, 2.82 BPM RATE: 2.81-2.85 BPM IN, 2.81-2.85 BPM OUT. CIRC PRESSURE: 3800-4070 PSI MUD WEIGHT: 9.60 PPG IN, 9.53 PPG OUT, ECD GETTING HIGH AT 11.60 PPG -,- ROP: 150-180 FT/HR, WOB: 1.25— 1.55 KLBS Printed 1/9/2017 10:08:19AM `All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Page 14 of 30 Common Well Name: 15-16 14:30 2.67 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations - (hr) (usft) 07:45 - 11:50 4.08 DRILL P PROD1 CONDUCT WIPER TO CLEAN UP WELLBORE INITIAL ECD OF 11.6 PPG, MW IN 9.60 PPG, CIRC PRESSURE OF 3740 ON TRIP UP, HOLE 11:50 14:30 2.67 DRILL P 14:30 - 16:30 2.00 DRILL P SEEMS CLEAN WITH PUW OF 44-46K - NO ISSUES PAST BILLET. PULL INTO WINDOW, OPEN EDC, BRING CIRC RATE UP TO 3.70 BPM AT 4150 PSI. CIRC PRESSURES ACCEPTABLE, INCREASE OF LARGER CUTTINGS ACROSS SHAKER WITH HIGHER FLOW RATE IN TUBING. CIRC DOWN LO -VIS / HI -VIS COMBO. CIRC RATE OF 3.88 BPM, 4200 PSI AS SWEEP EXITS BIT IN TUBING. RETURNS AHEAD OF SWEEP BROUGHT BACK LARGER CUTTINGS AND QUITE A FEW LARGE "PATTIES" OF SAND. RETURNS AT SWEEP NOT REALLY REMARKABLE. CIRC PRESSURE IMMEDIATELY AFTER SWEEP INCREASED BY -75 PSI BUT TAPERED OFF. - RIH AT 100 FPM TO FLUSH TUBING, CIRC AT 3.65 BPM, 4120 PSI WHILE RUNNING DOWN. PAUSE AT WINDOW TO CLOSE EDC, BACKFLUSH MICROMOTION AND BAKER CHOKE OF POTENTIAL DEBRIS. RETURNED SOME LARGE CHUNKS OF SHALE, LINE ALL CLEAR. - LOG DOWN TO RA TAG, +9.5' CORRECTION. CONTINUE DOWN. NO ISSUES OUT OF WINDOW OR PAST BILLET. SLACK OFF WEIGHT RUNNING DOWN VERY SMOOTH AT 13-15K. PROD1 DRILL 4-1/4" LATERAL FROM 14,654' MD TO 14,969' - FREE SPIN: 3800 PSI, 2.82 BPM RATE: 2.81-2.85 BPM IN, 2.81-2.85 BPM OUT. CIRC PRESSURE: 3980-4100 PSI MUD WEIGHT: 9.60 PPG IN, 9.53 PPG OUT, ECD 11.43 PPG ROP: 85-180 FT/H R, WOB: 1.25- 2.6 KLBS PROD1 WIPER TO CLEAN UP WELLBORE, PREPARE FOR MUD SWAP. PUMP DOWN LO -VIS PILL 'TO HELP CLEAN HOLE. INITIAL ECD OF 11.43 PPG, MW IN 9.56 PPG, CIRC PRESSURE OF 3650 ON TRIP UP, PUW OF 46-47K -CIRC PRESSURE REMAINED FLAT AT 3650 PSI, ECD DROPPED DOWN TO 11.0 PPG - INCREASE OF LARGER CUTTINGSACROSS SHAKER WITH RETURNS AHEAD OF SWEEP. RETURNS AT SWEEP NOT REALLY REMARKABLE. TURNAROUND FOR TRIP BACK TO BOTTOM SLACK OFF WEIGHT RUNNING DOWN VERY SMOOTH AT 13-15K. CIRCULATING DOWN CLEAN MUD ON TRIP IN AT 1.6 BPM, INITIAL CIRCULATION PRESSURE OF 2280 PSI. NEW MUD OUT OF BHA, CIRC PRESSURE NOW 3490 PSI AT 2.91 BPM. MW IN 9.61 PPG. Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 15 of 30 Operation Summary Report Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 iX3-0186W-C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 1 (usft) 116:30 17.30 1.00 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 14,969' MD FREE SPIN: 3570 PSI, 2.91 BPM RATE: 2.81-2.85 BPM IN, 2.81-2.85 BPM OUT. CIRC PRESSURE: 3980 -4100 PSI - MUD WEIGHT: 9.61 PPG IN, 9.53 PPG OUT, ECD 11.43 PPG ROP: 85-180 FT/HR, WOB: 1.25- 2.6 KLBS HAVING SLIDING ISSUES IMMEDIATELY WITH NEW MUD IN OPEN HOLE. INITIAL SLACK OFF WEIGHTS OF 4-7K FELL OFF TO AS LITTLEAS -8K. WORKING VERY HARD TO GET WEIGHT TRANSFER TO BIT BY ADJUSTING PUMPS, CYCLING IN VARYING PICKUP LENGTHS, ATTEMPTING TO HIT BOTTOM WITH DIFFERENT RUNNING SPEEDS TO GET BIT TO ENGAGE. HAVING -5K OVERPULLS ON PICKUPS OFF BOTTOM. CHECKED WITH GEO, IN VICINITY OF TRANSITION ACROSS FAULT 117,30 18:00 0.50 DRILL P PROD1 CONDUCT 900' WIPER TO SEE IF IT WILL HELP WITH WEIGHT TRANSFER, PICK UP OFF BOTTOM STICKY AT 52K. PICKUP WEIGHT PULLING UP HOLE AT 47-48K. - MW IN 9.64 PPG, MW OUT 9.63 PPG, ECD OF 11.37 PPG, CIRC RATE OF 2.90 BPM, 3560 PSI _ 1 - WELL STABILITY IS GOOD, FULL RETURNS 18:00 00:00 6.00 DRILL P PROD1 ATTEMPT TO INITIATE DRILLING. VERY SLOW GOING. TRANSFER BECOMING AN ISSUE. WIPER TO WINDOW, OPEN EDC AND PUMP BOTTOMS UP. LOG TIE IN WITH +14.5' CORRECTION. RUN BACK TO BOTTOM ATTEMPT TO DRILL AHEAD. ITSACTING LIKE WE ARE STICKING UP THE HOLE. - WIPER TO ABOVE TANGENT SECTION 12/23/2016 00:00 - 03:30 3.50 DRILL P PROD1 MUD WEIGHT: 9.60PPG IN, 9.55 PPG OUT RATE: 3.79 BPM IN, 3.15 BPM OUT -CUTTINGS INCREASE AT 1500' JOG BHA IN HOLE. 03:30 - 04:35 1.08 DRILL P PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC CLOSE EDC, POWER DOWN INJECTOR OFF: 03:45 I PERFORM WEEKLY BOPE FUNCTION TEST _ _ WHILE SCRIBING AGITATOR 04:35 05:00 0.42 DRILL P PROD1 MAKE UP 4-1/4" DRILLING BHA #7 PICK UP 2-7/8" M1XLS (1.15 DEG AKO) AND 3" COILTRAK TOOLS MAKE UP 4-1/4" BICENTER BIT SURFACE TESTED TOOL. GOOD TEST. PRESSURE TEST QTS TO 300 PSI LOW FOR 15 MINUTES / 4000 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 04:35 SHALLOW TEST AGITATOR Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Common Well Name: 15-16 - - - AFE No - Page 16 of Lvent type: RL -LN I LR- UNSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016.X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Levet) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 09:00 4.00 DRILL P PROD1 RIH WITH 4-1/4" DRILLING BHA #7 - RATE: 1.67 BPM IN, 1.96 BPM OUT. CIRC PRESSURE: 1512 PSI MUD WEIGHT: 9.50 PPG IN, 9.50 PPG OUT RIH, LOG TIE-IN WITH -18' CORRECTION RUN TO WINDOW, CLOSE EDC, EXIT WINDOW WITH NO ISSUES. RUN PAST BILLET CLEAN. SLACK OFF WEIGHT RUNNING IN HOLE 12-14K 09:00 09:20 0.33 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 15,079' MD FREE SPIN: 4105 PSI, 2.55 BPM; FREE SPIN RANGE BEFORE PICKING UP AGITATOR 3600-3800 PSI AT 2.87-2.92 BPM RATE: 2.56 BPM IN, 2.56 BPM OUT. CIRC PRESSURE: 4340-4365 PSI MUD WEIGHT: 9.57 PPG IN, 9.54 PPG OUT, ECD 11.43 PPG ROP: 100 FT/HR, WOB: 1.95 KLBS ATTEMPT TO PICKUP, STUCK 09:20 09:45 0.42 DRILL N STUC 15,117.00 PROD1 WORK TO FREE PIPE. TAKING WEIGHT ON THE DPS (STICKING MECHANISM IS AT BHA) BUT ABLE TO MOVE ORIENTER AND GAIN FULL RETURNS WHILE PUMPING. CIRCULATE AN OPEN HOLE VOLUME OF 20 BBLS AT 2.88 BPM, 4560 PSI. COME DOWN ON PUMPS TO REDUCE ECD, DROPPED FROM 11.43 PPG TO 10.04 PPG. PLACE COIL IN NEUTRAL WEIGHT FOR 10 MINUTES, ATTEMPT TO PULL, FREE ON FIRST PICKUP ATTEMPT. PUW OF 90K WITH PUMPS OFF BROKE PIPE FREE. 09:45 10:20 0.58 DRILL N STUC 15,117.00 PROD1 MOVE PIPE AND CIRCULATE DOWN LO VIS/ HI VIS COMBO TO CLEAN UP WELLBORE_. 10:20 11:20 1.00 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 15,117' MD FREE SPIN: 4140 PSI, 2.60 BPM INITIAL DRILLING RATE OF 2.60 BPM IN, 2.60 BPM OUT BUT CIRC PRESSURE CREPT TOO HIGH TO SETTING FOR PUMP TRIPS DRILL RATE OF 2.54-2.60 BPM IN, 2.54-2.60 BPM OUT, 4280-4510 PSI - MUD WEIGHT: 9.62 PPG IN, 9.59 PPG OUT, ECD 11.35 PPG ROP: 100-145 FT/HR, WOB: 1.95-2.7 KLBS SLACK OFF WEIGHT WHILE ON BOTTOM DRILLING 4-8K; WEIGHT TRANSFER TO BIT IS GOOD ALTHOUGH HAVING TO PICK UP FREQUENTLY WITH DRILL -OFFS PICKUPS ARE AVERAGING 57K BREAKOVER AND 55K PUW -ATTEMPT TO PICKUP, TEMPORARILY DETAINED AGAIN AT 15,215' Printed 1/9/2017 10:08:19AM `All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 17 of 30 Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations - (hr) _ (usft) 11:20 14:30 3.17 DRILL N STUC 15,215.00 PR6D1 WORK TO FREE PIPE BY MAKING ATTEMPTS TO MOVE UP OR DOWN, NO-GO. WEIGHT ON THE DPS AND ABLE TO MOVE ORIENTER AND GAIN FULL RETURNS WHILE PUMPING. CIRCULATE AN OPEN HOLE VOLUME OF 30 BBLS AT 2.80 BPM, 4450 PSI. COME DOWN ON PUMPS TO REDUCE ECD, DROPPED FROM 11.55 PPG TO 9.15 PPG. PLACE COIL IN NEUTRAL WEIGHT FOR 10 MINUTES, MAKE SEVERAL ATTEMPTS TO PULL, NO-GO. PLACE IN TENSION AND CONTINUE CIRCULATING AT 2.70 BPM, 4220 PSI WITH FULL RETURNS WHILE PITS ARE SET UP FOR MINERAL OIL PILL. MAKE SEVERAL MORE ATTEMPTS WITH PUMPS ON AND OFF AT GETTING FREE WITH NO SUCCESS. KCL SPACER IS READY, PUMP DOWN KCL AND MINERAL OIL PILL PER WELL PLAN, STAGE MINERAL OIL OUT OF BHA INTO OPEN HOLE, SOAK FOR 5 MINUTES. PICK UP, FREE. CIRCULATE PILL OUT, GET CLEAN MUD ABOVE BHA, RECIPROCATE AND RE -SET -- - - — -- DEPTH. 14:30 17:05 2.58 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 15,215' MD FREE SPIN: 3900 PSI, 2.65 BPM INITIAL DRILLING RATE OF 2.66 BPM IN, 2.67 BPM OUT WHILE MINERAL OIL PILL IS MOVING UP WELL - DRILL RATE OF 2.66 BPM IN, 2.67 BPM OUT, 4350- - MUD WEIGHT: 9.63 PPG IN, 9.59 PPG OUT, ECD 11.35 PPG ROP: 175 FT/HR, WOB: 2.0-2.7 KLBS SLACK OFF WEIGHT WHILE ON BOTTOM DRILLING AS LITTLE AS 0 K AND HIGH AS 10 K; WEIGHT TRANSFER TO BIT IS GOOD, HAVING TO PICK UP FREQUENTLY WITH DRILL -OFFS PICKUPS ARE AVERAGING 62-65K BREAKOVER AND 55K PUW -ATTEMPT TO PICKUP, TEMPORARILY DETAINED AGAIN AT 15,366' 17:05 17:30 0.42 DRILL N STUC 15,366.00 PROD1 WORK TO FREE PIPE BY MAKING ATTEMPTS 'TO MOVE UP OR DOWN, NO-GO, WEIGHT ON THE DPS AGAIN. ABLE TO MOVE ORIENTER 'AND HAVE FULL RETURNS WHILE PUMPING. CIRCULATE AN OPEN HOLE VOLUME OF 30 BBLS AT 2.82 BPM, 4600 PSI. COME DOWN ON PUMPS TO REDUCE ECD, DROPPED FROM 11.58 PPG TO 9.15 PPG. PLACE COIL IN NEUTRAL WEIGHT FOR 10 MINUTES, FREE AFTER ONE ATTEMPT. 17:30 19:15 1.75 DRILL P PROD1 SEND DOWN LO -VIS/ HI -VIS COMBO. BEGIN PULLING OUT OF HOLE FOR WIPER UP TO WINDOW. CIRC AT 2.57 BPM, 4250 PSI ON TRIP UP. PICK UP WEIGHT OF 49-51 K WHILE PULLING UP HOLE. NO ISSUE COMING BY BILLET OR WINDOW OPEN EDC AND FINISH PUMPING SWEEPS - _ OUT. Printed 1/9/2017 10:08:19AM 'All depths reported in Drillers Depths* North America - ALASKA - BP Page 18 of 30 Operation Summary Report Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) ! Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA I BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code i NPT NPT Depth Phase Description of Operations (hr) _ (us_ft) 19:15 20:30 1.25 DRILL P PROD1 CLOSE EDC LOG DOWN FOR TIE-IN FROM 13295' TO 13332.12' MD (RA TAG) WITH +2.5' CORRECTION RIH TO BOTTOM 20:30 23:20 2.83 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 15366' MD TO 15442' MD FREE SPIN: 4200 PSI, 2.4 BPM RATE: 2.4 BPM IN, 2.4 BPM OUT. CIRC PRESSURE: 4200-4650 PSI MUD WEIGHT: 9.63 PPG IN, 9.62 PPG OUT, ECD: 11.63 PPG ROP: 30 FT/H R, WOB: 1.5 - 3.5 KLBS 23:20 23:40 0.33 DRILL N STUC 15,442.00 PROD1 WORK TO FREE PIPE BY MAKING ATTEMPTS TO MOVE UP OR DOWN, NO-GO. STUCK ABOVE DPS, ABLE TO MOVE ORIENTER AND HAVE FULL RETURNS WHILE PUMPING. COME DOWN ON PUMPS TO REDUCE ECD, DROPPED FROM 11.63 PPG TO 9.15 PPG. PLACE COIL IN NEUTRAL WEIGHT FOR 10 MINUTES, FREE AFTER 2ND ATTEMPT. 23:40 00:00 1 0.33 DRILLP PROD1 PULL 200' WIPER 12/24/2016 00:00 03:307 3.50 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 15445' MD TO ' 15551' MD FREE SPIN: 4000 PSI, 2.36 BPM RATE: 2.36 BPM IN, 2.36 BPM OUT. CIRC PRESSURE: 4120 PSI MUD WEIGHT: 9.65 PPG IN, 9.64 PPG OUT, ECD: 11.56 PPG ROP: 35 FT/H R, WOB: 3.0- 3.5 KLBS CONTINUE TO BUILD ANGLE TO GET OUT OF BSAD. SAMPLE SHOWING STILL IN THE BSAD TRANSITION. NO SIGN OF KAVIK. PERFORMING 100-200' WIPERS AS NEEDED. 03:30 07:00 3.50 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 15551' MD FREE SPIN: 4000 PSI, 2.38 BPM RATE: 2.38 BPM IN, 2.38 BPM OUT. CIRC PRESSURE: 4260 PSI MUD WEIGHT: 9.62 PPG IN, 9.63 PPG OUT, ECD: 11.66 PPG ROP: 35 FT/HR, WOB: 2.0- 3.5 KLBS CONTINUE TO HAVE TO PICK UP TO INITIATE DRILLING. STICKY PICKUPS BUT COMES FREE. -PULLED 85KAT 15530', PULLED FREE. PERFORM 500' WIPER. DISCUSSION WITH ODE / GEOLOGY. TURN j ANGLE STRAIGHT UP TO GET OUT OF BSAD. GEOLOGISTS CONFIRMED THEIR INFORMATION, DISCUSS WITH ODE AND AGREE TO POH FOR SIDETRACK RUN CONDUCT DYNAMIC FLOW CHECKAT.45 BPM, FLOW CHECK GOOD WITH FLOW IN AND OUTAT .45 BPM Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 19 of 30 Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00.00AM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61_00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations - (hr) (usft) 07:00 11:35 4.58 DRILL N DPRB 15,650.00 PROD1 POH WITH BHA CHASE LO -VIS / HI -VIS PILL COMBO AT BILLET SET DEPTH TO CLEAN THAT AREA. CONTINUE POH AT 2.51 BPM, 4300 PSI WITH 42-43K PICK UP WEIGHT WHILE PULLING AT 24 FPM. FAIRLY SMOOTH PICK UP. - CLEAN TRIP PAST BILLET AT 13,610' PULL UP TO WINDOW, LO -VIS / HI -VIS PILL READY. OPEN EDC, JET ACROSS WHIPSTOCK TRAY WITH PILL TO ENSURE CLEAN AT 3.65 BPM, 4280 PSI. POH AT 3.64 BPM, 4290 PSI; INCREASE UP TO 3.72 BPM, WITH PRESSURE DROP TO 3805 PSI - PJSM FOR FLOW CHECK, LAYING DOWN BHA. FLOW CHECK WITH BHA BELOW BOP STACK. NO FLOW, GOOD FLOW CHECK. PULL BHA INTO STACK, POP OFF WITH INJECTOR. 11:35 12:15 0.67 DRILL N DPRB 15,650.00 PROD1 LD BHA. BIT GRADE 1 -1 -NO. -INSPECT BILLETASSEMBLY. MU BILLET 'RUNNING ASSEMBLY ONTO BHI SMART TOOLS. _ STAB ON WITH INJECTOR 12:15 20:00 7.75 DRILL N DPRB 15,650.00 PROD1 PRESSURE TEST QUICK TEST SUB WHILE MWD TOOLS ARE POWERED UP, GAIN RETURNS. RIH WITH BHA. TIE IN WITH -19'. CONTINUE DOWN TO WINDOW. PICK UP WEIGHTAT WINDOW 44K. EXIT WINDOW WITH NO ISSUES. SLIGHT BOBBLE PASSING BY EXISTING BILLETAT 13,610' BUT MOVE PAST WITHOUT ISSUE. RUN BILLET TO SET DEPTH. MOVE DOWN TO SET DEPTH, PLACE TOP OF BILLETAT 15,100' WITH HIGH SIDE EXIT ORIENTATION. PRESSURE UP, WITNESS ' SHEAR AT 4620 PSI TO SET BILLET ANCHORS, SET DOWN WITH 5K, CONFIRM SET. - DYNAMIC FLOW CHECK OFF BOTTOM, WELL STATIC. POOH. 20:00 20:20 0.33 DRILL N DPRB 15,650.00 PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC CLOSE EDC, POWER DOWN -INJECTOR OFF: 19:55 20:20 20:45 0.42 DRILL N DPRB 15,650.00 PROD1 MAKE UP 4-1/4" DRILLING BHA #9 -PICKUP 2-7/8" M1XLS (1.15 DEG AKO) AND 3" COILTRAK TOOLS MAKE UP 4-1/4" HCC RERUN BICENTER BIT SURFACE TESTED TOOL. GOOD TEST. PRESSURE TEST QTS TO 300 PSI LOW FOR 5 MINUTES / 4000 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 20:45 Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site. PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Page 20 of 30 Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr)_ (usft) 20:45 00:00 3.25 DRILL N DPRB 15,650.00 PROD1 RIH WITH 4 -1/4'; -DRILLING BHA#9 FROM SURFACE TO 12815' MD RATE: 2.14 BPM IN, 2.66 BPM OUT. CIRC PRESSURE: 2640 PSI MUD WEIGHT: 9.56 PPG IN, 9.56 PPG OUT LOG DOWN FOR TIE-IN FROM 12815' (FORMATION) WITH +3.5' CORRECTION CORRECTION DIFFERENT FROM EARLIER CORRECTIONS. LOG RATO CONFIRM. RA ON DEPTH. CONTINUE TO RUN IN HOLE 12/25/2016 00:00 - 01:00 1.00 DRILL N DPRB 15,650.00 PROD1 RIH WITH 4-1/4" DRILLING BHA#9 RATE: 2.14 BPM IN, 2.66 BPM OUT. CIRC PRESSURE: 2640 PSI MUD WEIGHT: 9.56 PPG IN, 9.56 PPG OUT 01:00 03:30 2.50 DRILL N DPRB 15,650.00 PROD1 RIH AND DRY TAG BILLET AT 15100.9' PICKUP AND BRING PUMPS UP TO 2.15 BPM INITIATE TIME MILLING AT 15099.1' FIRST MOTOR WORK WAS SEEN TIME MILL TO 15100.5' WOB INCREASED TO 12.5K. NO MOTOR WORKAND WEIGHT STAYING STEADY INCREASE RATE TO 2.25 BPM. START INCREASING DRILLING SPEED, MILL OFF BILLET. SEE GOOD DEPARTURE. SWAP OVER TO 15-16C RON 03:30 - 05:00 1.50 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 15,100' MD TO 15242' - FREE SPIN: 4000 PSI, 2.45 BPM RATE: 2.45 BPM IN, 2.44 BPM OUT. CIRC PRESSURE: CYCLING DUE TO MUD SWAP MUD WEIGHT: 9.1 PPG IN, 9.57 PPG OUT, ECD: 1.55 PPG ROP: 100 FT/HR, WOB: 1.5 - 2.0 KLBS ONCE 50' PAST BILLET, SWAP MUD TO 9.0 PPG. SENT 10 BBL 9.5 PPG HIVIS PILL AHEAD. NEW 9.0 PPG MUD AT SURFACE. ESTABLISH I NEW PARAMETERS HMS SWEEP BROUGHT SUBSTANTIAL AMOUNT OF ALUMINUM BACK. WHEN LEADING EDGE OF NEW MUD, DEFINITE -' SOLIDS INCREASE. 05:00 06:30 1.50 DRILL P PROD1 DRILL 4-1/4" BUILD/LATERAL FROM 15242' MD FREE SPIN: 3800 PSI, 2.69 BPM RATE: 2.69 BPM IN, 2.69 BPM OUT. CIRC PRESSURE: 3929-4000 PSI MUD WEIGHT: 9.14 PPG IN, 9.20 PPG OUT, ECD: 10.80 PPG ROP: 125 FT/HR, WOB: 1.0 - 2.0 KLBS DIFFICULTY GETTING BACK TO BOTTOM TO DRILL AHEAD AFTER A PICKUP. MAKE SEVERAL ATTEMPTS, SOMETHING HOLDING BHA BACK, SEEMS LIKE IT IS UP HOLE. Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 21 of 30 Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 IX3-0186W-C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:00AM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) - 06:30 - 08:00 1.50 DRILL P PROD1 CONDUCT 1000' WIPER TO MOVE CUTTINGS AND CLEAN UP WELLBORE. INITIAL PICKUP HEAVY AT 58K. PICK UP WEIGHT DURING WIPER CONSISTENTLY HIGH AT 53-54K COMPARED TO EARLIER PUW OF -47K. NO ISSUES PICKING UP ACROSS BILLET AT 15,100' WITH PUMPS DOWN. MW IN 9.22 PPG, MW OUT 9.05 PPG SLACK OFF WEIGHT WHILE RUNNING BACK DOWN 4-7KAND AS LOW AS 2K. INDICATIONS ARE AGITATOR IS WORKING WELLAT 2.9 BPM, SEEING DIFFERENTIAL PRESSURE AND VIBRATIONS ON LATERAL SURVEY QUALITY. MOVE PAST BILLET WITH PUMPS OFF, ALL GOOD. CONTINUE PAST WITH AS -DRILLED ORIENTATION, CANNOT GET PAST 15,147'. LOGS INDICATE THAT THIS IS A CLEAN AREA, SHOULD NOT BE HAVING DIFFICULTY. TRY DIFFERENT PUMP RATES AND ORIENTATIONS, NO GO. PULL BACK TO BILLET WITH PUMPS OFF, SMOOTH PASS. BRING ON PUMPS TO DRILLING RATE, DRILL BY BILLET AT 1.5 FPH, VERY SMOOTH AND NO INDICATIONS OF ISSUES AT BILLET. VERIFY SURVEY DATA WHILE DRILLING BY THAT BHA IS IN NEW HOLE WITH COMPARISONS OF NEAR -BIT INCLINATION. CONTINUE DOWN AT NORMAL RUNNING RATE. LOSE WEIGHTALMOST IMMEDIATELY. SLOW RUNNING RATE AND GAIN WEIGHT BACK DIFFICULTY NOW BEGINNING AT 15,133'. HANGING UP WITH -15K WEIGHT, ALL iSTICKING MECHANISM ISABOVE BHA. Printed 1/9/2017 10:08:19AM `All depths reported in Drillers Depths' North America - ALASKA - BP Page 22 of 30 Operation Summary Report Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 ! End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) -- - — Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61,00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 13:15 5.25 DRILL N DPRB 15,333.00 PROD1 CONDUCT LONG WIPER FROM 15,150' - INITIAL CIRC RATE OF 2.91 BPM WITH 4300 PSI AND ECD OF 10.66 PPG PICK UP WEIGHT MOVING UP HOLE OF i58 -62K. NO ISSUES PAST BILLET AT 15,100'. CONSISTENT PUW OF 60K IN OPEN HOLE, OBSERVED TWO MINOR OVERPULLS ASSOCIATED WITH DROP IN RETURNS BETWEEN THE TWO BILLETS. SLIGHT DROP IN RETURNS AS BHA CROSSED BILLETAT 13,610'. - CONTINUE UP HOLE. PUW BELOW WINDOW OF 54K, CIRC PRESSURE OF 4100-4400 PSI AT 2.89 BPM (AGITATOR) WITH ECD OF 10.60 PPG. PULL INTO WINDOW, OPEN EDC, BRING PUMP RATE UP TO 4.36 BPM, 4460 PSI, ECD OF 10.91 PPG. PUW 52K IN CASED HOLE. 'LO -VIS / HI -VIS COMBO GOING DOWN. - BACK OFF OF RATE TO 4.20 BPM DUE TO PRESSURES. — OBSERVE SLIP OF CTDS READING FROM INJECTOR ENCODER. COIL HAS "GUMMY" DEBRIS ON IT. MONITOR CLOSELY IN COMPARISON TO MECHANICAL COUNTER !WHILE PULLLING UP HOLE, CALCULATE 17' DIFFERENCE. GETTING VERY LARGE ALUMINUM DEBRIS BACK FROM WELL, STEADY STREAM OF THICK CUTTINGS AHEAD OF SWEEP. OVERBOARD SWEEP VOLUME DUE TO AMOUNT OF CUTTINGS AND HIGHER DENSITY. BACKFLUSH MICROMOTION SEVERAL TIMES DURING TRIP UP. CBU FROM 4800', CUTTINGS VOLUME DROPPED SOME BUT MICROMOTION PLUGGING OFF CONSISTENTLY. BLOW DOWN, RUN BACK DOWN AT MAX FLOW RATE AND RUN IN RATE TO FLUSH CUTTINGS FURTHER. STILL GETTING CONSISTENT VOLUME OF CUTTINGS AND HAVING TO BACKFLUSH / BLOWDOWN MICROMOTION OFTEN. MW OUT AT 9.15-9.2 PPG SLACK OFF WEIGHT WHILE RIH IS AT 6.6-8.2K, SLIGHTLY LOWER THAN PREVIOUS RUNS. EP MUD LUBE PILL PREPARED, PUMP DOWN 30 BBL PILL. RETURNS FROM RIH AT HIGH SPEEDARE FLUSHING OUT DIME -SIZE SHALE CUTTINGS AND CUTTING "SLUGS" SLACK OFF WEIGHT AS BHA APPROACHES WINDOWALMOST HALF OF WHAT IT WAS IN PREVIOUS RUNS AT 9-10K LOG TIE-IN ON RUN IN WITH 0' CORRECTION, WHICH WHEN COMPARED TO PREVIOUS SLIPPAGE ON ENCODER WHEN ' POH IT CORRESPONDS TO THE TYPICAL CORRECTION ON THIS WELL. CONTINUE TO CIRCULATE TO COAT WELL WITH EP MUD LUBE PILL. INITIAL EFFECT OF 52K PUW AND 15-17K SOW. MUD LUBE AROUND, MW IN AND OUT 9.1 PPG. CLOSE EDC, RUN INTO OPEN HOLE. Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America -ALASKA - BP Operation Summary Report Page 23 of 30 Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations — -(hr) _ (usft) _ 13:15 14:30 1.25 DRILL N DPRB 15,333.00 PROD1 RIH THROUGH WINDOW, NO ISSUES. INITIAL SLACK OFF WEIGHT OF 15K. MOVE PAST BILLET AT 13,610', NO ISSUES. CONTINUE MOVING DOWN HOLE, SOW 9-13K WITHOUT USE OF AGITATOR. AS BHA GOT CLOSE TO SECOND BILLET, BEGAN HAVING WEIGHT ISSUES AND STACKED OUT AT 15,079'. SOW WAS IN WIDE RANGE OF 4-9K PICKUP WAS REALLY HEAVY AT 74K. CONTINUE TO PICK UP WITH 62-64K PUW. MOVE BACK DOWN, INCREASE RUNNING SPEED FROM 30 FPM TO 55 FPM. STACKED OUT COMPLETELY AT 15,087'. PICK UP WITH 70K TO BREAK OVER, CONTINUEUPAT66K. MOVEDOWNAGAIN WITH REDUCED PUMP RATE, STRUGGLE PAST BILLET TOP. CONTINUE DOWN WITH NEGATIVE WEIGHT DOWN TO -16K, MOVE IN SMALL BITES. 14:30 - 15:00 0.50 DRILL P PROD1 I DRILL 4-1/4" LATERAL FROM 15,333' MD FREE SPIN: 3810 PSI, 2.65 BPM RATE: 2.64 BPM IN, 2.63 BPM OUT. CIRC PRESSURE: 3760-3860 PSI MUD WEIGHT: 9.20 PPG IN, 9.12 PPG OUT, ECD: 10.78 PPG ROP: 75 FT/HR, WOB:.6 -9 KLBS DRILLED TO 15,359', WEIGHT FELL OFF AND I STUCK. OFF OF PUMPS, ECD DROPPED FROM 10.6 TO 9.85 PPG, ATTMEPT TO PICK UP. REMAIN IN TENSION, ORIENTER FREE. _ 15:00 - 17:40 2.67 DRILL N STUC 15,359.00 PROD1 OFF PUMPS AND RELAX FOR 10 MINUTES, ATTEMPT TO PULL WITHOUT SUCCESS. CIRCULATE OPEN HOLE VOLUME AND SAW PIPE MOVEMENT, ATTEMPTED TO PICK UP AND PIPE MOVED A FEW FEET BUT THEN NO MORE. CONTINUE WITH CIRCULATING OPEN HOLE VOLUME. LET HOLE RELAX FOR 15 MINUTES, ECD DROPPED FROM 10.78 PPG TO 9.54 PPG. GIVE IT ANOTHER PULL, NO MOVEMENT. CIRCULATE DOWN KCLAND MINERAL OIL PILL PER WELL PLAN. PULLED FREE AFTER THIRD CYCLE WITH GETTING MINERAL OUT OF BHA.- IMMEDIATELY PICK UP TO MOVE PIPE, MOVE DOWN WHILE HOLE IS ALLOWING MOVEMENT AND ATTEMPT TO ' DRILLAHEAD WHILE KCLAND MINERAL OIL ARE CIRCULATED OUT. 17:40 - 19:50 2.17 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 15,359' MD FREE SPIN: 3550 PSI, 2.60 BPM RATE: 2.60 BPM IN, 2.55 BPM OUT. CIRC 'PRESSURE: 3680 PSI MUD WEIGHT: 9.18 PPG IN, 9.12 PPG OUT, ECD: 10.40 PPG ROP: 75-100 FT/HR, WOB: 1.5 KLBS Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 24 of 30 Common Well Name: 15-16 ' AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site. PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) -- (usft) 19:50 22:15 2.42 DRILL N STUC 15,434.00 PROD1 DIFFERENTIALLY STUCK COME OFF LINE TO RELAX HOLE FOR 20 MINUTES. ECD DROPPED FROM 10.79 PPG 'TO 8.7 PPG -WORK PIPE, NO MOVEMENT. CONTINUE CIRCULATION WHILE PREPARING TO PUMP MINERAL OIL CIRCULATE KCLAND MINERAL OIL PER WELL PROGRAM. ON SECOND RENDITION. POPPED FREE CIRCULATE REMAINING MINERAL OILAND KCL OUT AND UP INTO CASED HOLE. 22:15 00:00 1.75 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 15435' MD- 15550 FREE SPIN: 3850 PSI, 2.60 BPM RATE: 2.60 BPM IN, 2.55 BPM OUT. CIRC PRESSURE: 3680 PSI MUD WEIGHT: 9.18 PPG IN, 9.12 PPG OUT, ECD: 10.40 PPG ROP: 68 FT/HR, WOB: 1.5 - 2.5 KLBS 12/26/2016 00:00 - 01:30 1.50 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 15550' MD TO 15621' MD FREE SPIN: 4050 PSI, 2.63 BPM RATE: 2.63 BPM IN, 2.63 BPM OUT. CIRC PRESSURE: 4050 — 4150 PSI MUD WEIGHT: 9.12 PPG IN, 9.12 PPG OUT, ECD: 11.06 PPG ROP: 68 FT/HR, WOB: 1.5 KLBS DRILLED AHEAD WITH A LOT OF PICK UPS. BRINGING LSRV ON MUD TO 60K 01:30 03:30 2.00 DRILL N STUC 15,621.00 PROD1 DIFFERENTIAL STUCK ABOVE DPS, ORIENTER MOVES FINE. - COME OFFLINE, LET HOLE RELAX, PULL INTO TENSION NO HELP. COMEBACK ONLINE TO CONTINUE CIRCULATING BOTTOMS UP WHILE MIXING KCL SPACERS. PUMP KCL / MINERAL OIL PER WELL PLAN. STAGE OUT THE BIT. POPPED FREE. PUMP KCL AND MINERAL OIL OUT AN UP INTO CASED HOLE. TURNAROUND, DRILLAHEAD WHILE CIRCULATING MINERAL OIL OUT. 03:30 06:00 2.50 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 15621' MD WITH STICKY DRILLING FREE SPIN: 4000 PSI, 2.49 BPM RATE: 2.49 BPM IN, 2.49 BPM OUT. CIRC PRESSURE: 4000- 4200 PSI MUD WEIGHT: 9.17 PPG IN, 9.17 PPG OUT, ECD: 11.18 PPG ROP: 50 FT/HR, WOB: 2.0 KLBS DRILLAHEAD WITH FREQUENT PICKUPS TO NOT GET DIFFERENTIALLY STUCK. TURN ANGLE UP TO GET OUT OF SHALE. I START SETTING DOWN ALL OVER. PERFORM WIPER TO WINDOW. Printed 1/9/2017 10:08:19AM `All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Page 25 of 30 Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor. NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) - (usft) _ 06:00 09:30 3.50 DRILL P PROD1 WIPER TRIP UP LOOKS GOOD, PICK UP WEIGHT MUCH BETTER AT 47-48K ON TRIP (-10K BETTER THAN DAY BEFORE) - NO ISSUES PAST EITHER BILLET ON TRIP IUP PULL INTO WINDOW, OPEN EDC AND JET ACROSS WHIPSTOCK TRAYAND LOG TIE-IN WITH +11' CORRECTION CBU AT 3.80 BPM, 4320 PSI. NO REAL CHANGE IN THE CUTTINGS VOLUME RETURNED ALTHOUGH IT STAYED VERY CONSISTENT THROUGHOUT WITH GOOD VOLUME. CLOSE EDC, RIH. SLACK OFF WEIGHT IN OPEN HOLE 14-15K. NO ISSUES PAST FIRST BILLET AT 13,610'. CONTINUE DOWN AT 2.0 BPM, 3160 PSI. CONDUCT PIN HOLE DRILL WITH CREW IN PROACTIVE MEASURE CROSS BY SECOND BILLET WITH NO ISSUES AND ACTUALLY HAVE GOOD WEIGHT TRANSFER, NO ISSUES BELOW BILLET. SLACK OFF WEIGHT PAST BILLET 11-14K. RIH PAST BILLET, CREW MEMBER SEES PINHOLE AT INJECTORI IMMEDIATELY STOP AND ASSESS 09:30 10:00 0.50 DRILL N SFAL 15,305.00 PROD1 CREW RESPONSE IS EXACTLY AS DISCUSSED IN DRILL. CLEARED FLOOR, SLB EQUIPMENT OPERATOR INSPECTED COIL, APPROXIMATELY 1/8" PINHOLE. FOLLOW PROCEDURE FOR PULLING BACK TO REELHOUSE AND SECURING WITH MUFFLER CLAMP. PUMP ACROSS TOP WITH CHARGE PUMP AND SLOWLY PULL PINHOLE TOWARDS REELHOUSE TO INSTALL MUFFLER CLAMP, CONDUCT DYNAMIC FLOWCHECK WHILE PULLING. FLOW CHECK IS GOOD, NO FLOW. SECONDARY CONTAINMENT IN PLACE, PINHOLE IS SECURED IN REELHOUSE. NO LEAKS AT THIS POINT, Printed 1/9/2017 10:08:19AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 26 of 30 Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations - - (hr) (usft) i 10:00 14:25 4.42 DRILL N SFAL 15,305.00 PROD1 CONTINUE POH SLOWLY WHILE CIRCULATING ACROSS TOP AND HOLDING 200 PSI BACK PRESSURE ON WELL WHILE IN OPEN HOLE TO PREVENT SWABBING (CAN'T i PUMP DOWN COIL) PICK UP WEIGHT WHILE POH AT 56-57K !WHILE PULLING AT 20 FPM. RETURNSARE CONSISTENTAT 1.05 BPM WHILE PUMPING ACROSS THE TOP AND HOLDING 200 PSI BACK PRESSURE. PICKUP WEIGHT IMPROVED TO 52K ONCE PAST 14,000'. SEE TRACTION REPORT 2016 -IR -5398703 'FOR FURTHER INFORMATION PULL INTO WINDOW WITH NO ISSUES. CONTINUE POH WHILE PUMPING ACROSS THE TOP. NITROGEN CREW IS ON LOCATION AND RIGGED UP. WSL WITNESSED LOWAND HIGH PRESSURE TRIPS. PRESSURE TEST LINES TO 4000 PSI. - PJSM FOR FLOW CHECKAND LAYING DOWN BHA. FLOW CHECK IS GOOD, NO FLOW. POP OFF WITH INJECTOR 14:25 15:00 0.58 DRILL N SFAL 15,305.00 PROD1 T_ LAYDOWN BHA. BIT 1 -1 -NO (3325' ON THIS BIT SO FAR). CLEAR AND CLEAN RIG FLOOR. PREP FOR FLUSHING COILAND BLOWING DOWN WITH NITROGEN. 115:00 - 17:15 2.25 DRILL N SFAL 15,305.00 PROD1 STAB ON WITH INJECTOR. CIRCULATE FRESH WATER AROUND PER PROCEDURE. ABLE TO CIRCULATE AT 2.13 BPM, 1475 PSI WITH NO LEAKAT MUFFLER. PJSM FOR PUMPING N2. REVIEW SLB PROCEDURE, NORDIC PROCEDURE AND PRESSURE CROSSCHECK. -WALK LINES, CLOSE IN VALVES AND MARK OFF RESTRICTED AREAS, FLOW BACK TANK LINE CLEAR — BLOWDOWN REEL. MAX PRESSURE SEEN DURING BLOWDOWN 1835 PSI. NO LEAKAT MUFFLER DURING BLOWDOWN. ALLOW PRESSURE TO BLEED OFF. CHECK REEL HOUSE, ALL CLEAR. 17:15 00:00 6.75 DRILL N SFAL 15,305.00 PROD1 PREP FOR LOWERING REEL '-CUTOFF CONNECTOR. INSTALL GRAPPLE, PULL TEST. -PREPARE TO PULL COIL ACROSS - PULL COILACROSS, SECURE TO REEL, RIG DOWN IRON / BULKHEAD. LOWER REEL _ PICK UP NEW REEL 12/27/2016 00:00 03:45 3.75 DRILL I N SFAL 15,305.00 PROD1 'REEL SWAP SECURE NEW REEL (REEL MOTOR, REEL 'PLATE) RIG UP INNER REEL IRON PREPARE TO PULL COIL ACROSS PULLACROSS, STAB INTO INJECTOR. BOOT -- — — E -LINE. Printed 1/9/2017 10:08:19AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 27 of 30 Common Well Name: 15-16 - -- - - - - - � AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 03:45 12:45 9.00 DRILL N SFAL 15,305.00 PROD1 FILL COIL WITH METHANOL SPEAR FOLLOWED BY WARM FRESH WATER. REVERSE CIRCULATE TO PUMP SLACK BACK FOR 2.3% SLACK CUT 16' OF COIL, E -LINE AT CUT (CALCULATED CUT SUPPOSED TO BE 140'). MAKE TWO MORE ATTEMPTS TO PUMP SLACK BACK. NO MOVEMENT. CONSULT WITH SLB LEADERSHIP, ADVISED TO PROCEED WITH INSTALLING COIL CONNECTOR. -PREP AND INSTALL CONNECTOR. PULL TEST TO 42K. PUMP SLACK FORWARD. HEAD UP WITH BHI, CONDUCT TEST. CIRCULATE FRESH COLD WATER INTO REEL FOR PRESSURE TESTS. CONDUCT BODY TEST TO ENSURE NO LEAKS. PRESSURE 1 TEST TO 250 PSI LOW/ 3500 PSI HIGH ON CHART RECORDER FOR AOGCC / CRITICAL RIG SAFETY EQUIPMENT REQUIREMENT. GOOD TEST. LINE UP FOR TESTING PRESSURE BULKHEAD AND INNER REEL IRON / REEL HOUSE IRON TO 4700 PSI. TEST IRON TO 250 PSI LOW/ 4700 PSI HIGH ON ELECTRONIC DATA RECORDER FOR BP REQUIREMENT. 12:45 13:15 0.50 1 DRILL N SFAL 15,305.00 PROD1 MAKE UP 4-1/4" DRILLING BHA # 10 -PICKUP 2-7/8" M1XLS (1.15 DEG AKO) AND 3.0" COILTRAK TOOLS - MAKE UP 4-1/4" HCC RERUN BICENTER BIT SURFACE TESTED TOOL. GOOD TEST. PRESSURE TEST QTS TO 300 PSI LOW FOR 5 MINUTES / 4000 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 13:10 13:15 17:00 3.75 DRILL N SFAL 15,305.00 PROD1 ' RIH WITH 4-1/4" DRILLING BHA #10, COME ONLINE TO TEST AGITATOR. WORKING WELL. RATE: 2.60 BPM IN, 3.15 BPM OUT. CIRC PRESSURE: 2717 PSI MUD WEIGHT: 9.12 PPG IN, 9.11 PPG OUT LOG DOWN FOR TIE-IN FROM 12800' TO 12847' MD (FORMATION) WITH -24' - CORRECTION 17:00 00:00 7.00 DRILL P PROD1 - - - - DRILL 4-1/4" LATERAL FROM 15712' MD TO 15992' - FREE SPIN: 4050 PSI, 2.60 BPM RATE: 2.60 BPM IN, 2.60 BPM OUT. CIRC PRESSURE: 4050 - 4300 PSI MUD WEIGHT: 9.08 PPG IN, 9.08 PPG OUT, ECD: 11.22 PPG ROP: 40-50 FT/HR, WOB: 2.0-3.0 KLBS CONTINUE DRILLING WITH FREQUENT STICKY PICK UPS. DECISION FROM GEO TEAM IS TO HOLD 90° TILL 16,000' START SEEING A 300+ API SHALE COMING IN AT - 15900'. GEOLOGY CALLED TO CLIMB - - - - - _ TO 95° Printed 1/9/2017 10:08:19AM 'All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Common Well Name: 15-16 AFE No Page 28 of 30 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations -(hr) (usft) 12/28/2016 00.00 - 01:00 1.00 - - -' DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 15992' MD TO 16039' - FREE SPIN: 4050 PSI, 2.60 BPM RATE: 2.60 BPM IN, 2.60 BPM OUT. CIRC PRESSURE: 4050-4300 PSI MUD WEIGHT: 9.16 PPG IN, 9.16 PPG OUT, ECD: 11.12 PPG ROP: 40-50 FT/HR, WOB: 2.0- 3.0 KLBS 01:00 - 02:00 1.00 DRILL N rSTUC 16,039.00 PROD1 DIFFERENTIAL STUCK PULL ON PIPE TWICE. STUCK BELOW DPS BUTABOVE HOT. 1-1 CIRCULATION PLACE PIPE IN TENSION. BOTTOMS UP PUMPED WHILE LVT PILL GOING DOWN, PUMP KCL / LVT / KCL. PUMP 5 BBLS OUT. LET SOAK. CAME FREE AFTER A COUPLE OF i PULLS. CIRCULATE MINERAL OIL UP INTO -' CASED HOLE, 02:00 03:00 1.00 DRILL P PROD1 DRILL 4-1/4" LATERAL FROM 16039' TO 16,100' FREE SPIN: 4000 PSI, 2.56 BPM RATE: 2.56 BPM IN, 2.55 BPM OUT. CIRC PRESSURE: 4050 - 4300 PSI - MUD WEIGHT: 9.16 PPG IN, 9.16 PPG OUT, ECD: 10.68 PPG ROP: 40-50 FT/HR, WOB: 2.0-3.0 KLBS DRILLAHEAD WHILE MINERAL OIL CIRCULATED UP AN OUT OF WELL. - BROKE INTO SOMETHING DIFFERENTAT 16050' ROP INCREASED AND GAMMA LOOKING BETTER. GEOLOGY TEM DISCUSSING IF WORTH PUSHING FOOTAGE. ROP STEADY -100 FPH WITH POSITIVE SURFACE WEIGHT. 03:00 - 03:20 0.33 DRILL P PROD1 PERFORM GEOLOGY WIPER WHILE DISCUSSIO TO EXTEND OR NOT. FINISH CIRCULATING MINERAL OILAND KCL OUT. 03:20 - 04:05 0.75 DRILL P PROD1 DRILLING CONDITIONS ARE GOOD, DISCUSS TD WITH ODE AND CONTINUE DRILLING - - - -AHEAD 04:05 04:25 0.33 DRILL N STUC 16,135.00 PROD1 DIFFERENTIALLY STUCK ABOVE THE WOB SUB SHUTDOWN PUMP AND WORK PIPE PREP TO PUMP KCL & MINERAL OIL -- PULLED TO 90K 6 TIMES OVER 15 MIN 04:25 05:10 0.75 DRILL N STUC 16,135.00 PROD1 PUMP 15 BBLS OF KCLAHEAD AND BEHIND - 20 BBLS OF MINERAL OIL 105:10 06:10 1.00 DRILL N STUC 16,135.00 PROD1 I PUMP 5 BBLS OF MINERAL OIL OUT AND LET SOAK PULL TO 93K AND NO MOVEMENT PUMP ANOTHER 5 BBLS OUTAND ALLOW TO SOAK FOR 5 MIN PULLED 93K 2 TIMES, NO MOVEMENT PUMP 5 MORE BBLS OUT AND SOAK CALL OUT FOR A CRUDE TRANSPORT 'WORK PIPE, 2 MORE PULLS TO 92KAND NO MOVEMENT ALLOW TO RELAX 5 MIN PULL TO 93K, NO MOVEMENT, PUMP LAST 5 BBLS OUT Printed 1/9/2017 10:08:19AM `All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 X3 -0186W -C: (2,544,339.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA ! BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Page 29 of 30 Date From - To Hrs Task Code NPT ! NPT Depth Phase Description of Operations (hr) - (usft) 06:10 - 07:20 1.17 DRILL N STUC 16,135.00 PROD1 NOTABLE TO PULL FREE AND WE HAVE EXHAUSTED HOW MUCH TIME WE CAN BE SHUT DOWN ONLINE WITH PUMP TO CIRC OUT MINERAL OIL & KCL, CALL ODE AND DISCUSS OPTIONS CIRC OUT MIN OIL, PUMPANOTHER 20 BBLS OF MINERAL OIL THEN LOOK AT SWAPPING _ THE WELL TO CRUDE 07:20 07:25 0.08 DRILL N STUC 16,135.00 PROD1 MIN OIL OUT SHUT DOWN PUMPAND TRY WORKING PIPE BEFORE PUMPINGA2ND - -- -- - PILL 07:25 08:15 0.83 DRILL N STUC 16,135.00 PROD1NO MOVEMENT, START PUMPING 15 BBLS OF KCLAHEAD AND BEHIND 20 BBLS OF _ MINERAL OIL 08:15 10:25 2 1q DRILL N STUC 16,135.00 PROD1 PUMPED 10 BBLS OUTAND SAW THE WOB CHANGE FROM NEGATIVE TO POSITIVE WT, PU AND WE ARE FREE CIRC OUT THE REST OF THE MINERAL OIL AND KCL THE POOH TO THE WINDOW, TD HAS BEEN CALLED STARTA LOW VIS PILL TO BE AT THE WINDOW WHEN WE GET THERE 10:25 - 11:15 0.83DRILL P PROD1 AT THE WINDOW, JOG IN HOLE AT MAX RATE, OPEN EDC AND WASH ACROSS WS TRAY AND PUH ABOVE THE WINDOW RIH AND LOG TIE IN WHILE PUMPING BOTTOMS UP WITH THE LOW VIS PILL CORRECT DEPTH +23', CONTINUE CIRCULATING BTM'S UP 11:15 12:55 1.67 DRILL P PROD1 20 BBLS AFTER BOTTOMS UP THE RETURNS 12:55 13 00 0.08 DRI CLEANED UP WITH D CUTTINGS _.�- I _ CLOSE THE EDC AND RIH - �-- - -- LL P PROD1 15500' CUTTINGS INCREASING AT THE SHAKER PUMP ANOTHER 20 BBL LOW VIS PILL AND CIRCA BOTTOMS UP FROM TD TO CLEAN UP CUTTINGS 13:00 14:35 1.58 DRILL P PROD1 TAG TD AT 16145', CONTINUE CIRCULATING 20 BBLS LOW VIS PILL 13:30 PILLATTHE BIT, CIRC OUT WATCHING RETURNS STEADY FINES COMING ACROSS THE - - -- — - SHAKER 14:35 15:20 0.75 DRILL P I PROD1 'LOW VIS AT SURFACE, CUTTINGS DROPPED OFF AND CLEANED UP -10 BBLS AFTER THE LOW VIS PILL WAS OUT REDUCE THE PUMP RATE TO DYNAMIC FLOW CHECK THE WELLAND STARTADDING - BEADS TO THE LINER PILLAND PUMP GOOD FLOW CHECK 15:20 16:20 1.00 DRILL P PROD1 POOH LAYING IN BEADS 16'20 16:35 0.25 DRILL P PROD1 ABOVE THE WINDOW, OPEN THE EDC PUMP AT MAX RATE WHILE LOGGING DOWN 16:35 19:00 2.42 DRILL P PROD1 CORRECT DEPTH +10.5' RIH JETTING WS TRAY WITH EDC THEN POOH AS PER PLAN PAINT FLAGSAT 12495' EOP (ORANGE), 9640' - I EOP (WHITE) Printed 1/9/2017 10:08:19AM `Ali depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 30 of 30 Common Well Name: 15-16 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2016 End Date: 12/28/2016 iX3-0186W-C: (2,544,339.00) Project. Prudhoe Bay Site: PB DS 15 i Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft_) 19:00 20:00 1.00 DRILL P PROD1 _ MONITOR WELL FOR 10 MINUTES AT BHA: STATIC CLOSE EDC, POWER DOWN INJECTOR OFF: 19:30 LAY DOWN BHA - : SWAP OVER TO CON EVENT Printed 1/9/2017 10:08:19AM "All depths reported in Drillers Depths` Printed 1/9/2017 10:09:OOAM *All depths reported in Drillers Depths" North Amedca - ALASKA - BP Page 1 of 7 Operation Summary Report Common Well Name: 15-16 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/28/2016 End Date: 1/1/2017 IX3-0186W-C: (1,143,907.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations - - - - (hr) - (usft) 12/28/2016 20:00 00:00 4.00 CASING P i RUNPRD PUMP SLACK OUT OF REEL. RECOVERED 424' OF E -LINE SURGED MULTIPLE TIMES. COULD NOT GET ANY MORE OUT. PREPARE AND INSTALL BOT COIL 'CONNECTOR PULL TEST TO 40K, PRESSURE TEST 3800# LOAD AND LAUNCH 3/4" DRIFT BALL PUMP DRIFT BALL. WENT OVER AT 66 - BBLS. RECOVERED 3/4" STEEL BALL 12/29/2016 00:00 06:15 6.25 CASING P RUNPRD ' PJSM FOR LINER MAKE UP. WSL, TP, DRILLER VERIFIED TALLY RUN SHOE TRACK 59 JTS 2-875" SOLID LINER W/ CEMENTRALIZERS RA PUP JOINT 15 JTS 2-875" SOLID LINER W/ CEMENTRALIZERS XO 16 JTS 3.250" SOLID LINER W/ CEMENTRALIZERS XO 14 JTS 3-1/2" SOLID LINER W/ I,CEMENTRALIZERS 3-1/2" PUP JOINT MADE UP AND FILLED EVERY 30 JTS. 06:15 06:30 0.25 CASING P RUNPRD HOLD A PJSM WITH DAY CREW TO MU THE UPPER LINER RUNNING BHA 06:30 0650 - _ 0.33 CASING P J- RUNPRD MU BHA 06:50 - 07.0040.17 - - CASING P RUNPRD FILL UPPER BHA WITH MUD 07:00 07:20 0.33 - CASING P -, RUNPRD PU THE INJECTOR, MU THE SWIVEL, STAB ON AND ESTABLISH CIRCULATION 09:05 1.75 CASING P RUNPRD RIH WITH LINER .0720 09.05 09:15 0.17 CASING P 1 RUNPRD STOP AT THE WINDOW FLAG MECH = 9671' ELEC = 13215.3' EDP FLAG = 9640 + BHA LEN = 3544.3 = 13184.3' 09:15 13184.3 - 13215.3 = -31' CORRECTION_ 10:05 0.83 CASING P RUNPRD CORRECT DEPTH TO 13,184.3' WT CK=48KAT29 FPM RIH WT= 18KAT23 FPM RIH THROUGH THE WINDOW CLEAN 10:05 SET DOWN AT 15645' MULTIPLE TIMES STARTING AT 15645TO 10:15 CEMENT CREW ON LOCATION Printed 1/9/2017 10:09:OOAM *All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 2 of 7 Common Well Name: 15-16 -- - AFE No Event Type: COM- ONSHORE (CON) I Start Date: 12/28/2016 End Date: 1/1/2017 X3 -0186W -C: (1,143,907.00) Project: Prudhoe Bay Site: PB DS 15 - - Rig Name/No.: NORDIC 2 RELEASE FROM LINER Spud Date/Time: 6/6/1984 12:00:OOAM i Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA CASING P BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code 11 NPT NPT Depth Phase Description of Operations - (hr)- (usft) 10:05 13:20 3.25 CASING P RUNPRD SET DOWN AT 15645' PU WT = 60K, RAN PAST DID NOT HEAR THE BALL GO THEN SET DOWN AGAIN HAVING TO WORK LINER DOWN A FEW FEET ATA TIME, CURRENTLYAT 15871' WITH 27 ROLLING PU'S TO THIS DEPTH STOP AND CIRCULATE THEN TRY WORKING REDUCE RATE AT 70% OF COIL VOLUME TO LINER DOWN AGAIN. WORKED DOWN TO 16,054'. TD FLAG WAS AT ALLOW THE BALL TO LAND ON SEAT THEN 16045 AND SHOULD HAVE BEEN AT 16039', -6- OF STRETCH WORKING PIPE TO THIS DEPTH 15:00 13:20 13:40 0.33 CASING P RUNPRD WORKED DOWN TO 16126' AND NOT MAKING RUNPRD NO BALL AT CALCULATED VOLUME ANY PROGRESS IN THE LAST HOUR, SET CYCLE PUMP RATE, NO INDICATION THE DOWNS ARE HARD AND FAST LIKE WERE TAGGING TD BUT DEPTH SHOWS WE ARE 19' SHALLOW, CALL ODE AND DISCUSS SHUT DOWN PUMP AND CYCLE PIPE, ONLINE - - IN & OUT RATES ARE 1:1 (0.4 BPM IN AND OUT WITH PUMP 15:25 15:35 - 0.17 AT 1920 PSI) Printed 1/9/2017 10:09:o0AM *All depths reported in Drillers Depths* DECISION MADE TO CALL THIS TD AND RELEASE FROM LINER 13:40 - 15:00 1.33 CASING P RUNPRD PU WT = 55KAT 16110' LOAD AND LAUNCH A 5/8" STEEL BALL DID NOT HEAR THE BALL GO PRESSURE UP AND RELAUNCH, BALL IS ROLLING REDUCE RATE AT 70% OF COIL VOLUME TO ALLOW THE BALL TO LAND ON SEAT THEN PRESSURE UP TO SHEAR 15:00 15:25 i 0.42 1 CASING P RUNPRD NO BALL AT CALCULATED VOLUME CYCLE PUMP RATE, NO INDICATION THE BALL IS IN SEAT SHUT DOWN PUMP AND CYCLE PIPE, ONLINE - - WITH PUMP 15:25 15:35 - 0.17 - CASING - P - - RUNPRD - BALL ON SEAT AT 87 BBLS, PRESSURE UP TO 4700PSI AND HOLD BALL SHEARED OUT PU 2X AT 43KAT 16113.6' MOVING FREE 15:35 16:45 1.17 CASING P RUNPRD DISPLACE WELL TO KCL 16:45 18:30 1.75 CASING P RUNPRD WELL DISPLACED TO KCL, FINISH PREPPING -- _ - - - - -! - PITS FOR CEMENT JOB Printed 1/9/2017 10:09:o0AM *All depths reported in Drillers Depths* Common Well Name: 15-16 North America - ALASKA - BP Operation Summary Report AFE No Page 3 of 7 Event Type: COM- ONSHORE (CON) Start Date: 12/28/2016 End Date: 1/1/2017 X3 -0186W -C: (1,143,907.00) Project. Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA_ BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ I (usft) 18:30 21:00 2.50 CASING P RUNPRD MIX AND PUMP 37.00 BBLS OF CEMENT: FILL LINES WITH WATER AND PRESSURE TEST TO 5000 PSI FOR 5 MINUTES CEMENT WET AT 19:10 HRS. ZERO IN MM ONCE DENSITY = 13.5 PPG LOAD 37 BBLS 15.3 PPG CEMENT IN REEL SWAP TO RIG PUMP. CLEANUP LINES TO SLB UNIT. PERFORM DISPLACEMENT WITH RIG PUMPS I- DISPLACE CEMENT WITH 8.4 PPG EXHAUST PILL RATE: 2.43 BPM IN, 2.35 BPM OUT ZERO OUT MM WITH CEMENTAT SHOE AT 92.8 BBLS AWAY - TAKE RETURNS TO PIT 4 FOR MANUAL STRAP - SHUT DOWN PUMPS AT 106.1 BBLS AWAY (13.6BBLS BEHIND PIPE) LAUNCH PEEWEE DART AND LINER WIPER 'PLUG AS FOLLOWS: PICK UP TO BREAKOVER +12 FT (16099' MD) PER BTT REP, EXPOSE DOGS, SET DOWN AT 16117' MD (10 FT HIGHER) PU: 45 KLBS, SO: -11 KLBS SHIFT LINER WIPER PLUG DOWN, PICK BACK UP TO 16099' MD AND SIDE EXHAUST 6 BBLS SET DOWN 10K AT 16117 MD PRESSURE UP ON WIPER PLUG AND ZERO MM. LINER WIPER PLUG SHEARED AT 4000 PSI (0.5.BBLS) DISPLACE LINER WIPER PLUG 22.0 BBLS DISPLACED AT 2 BPM: 2300 PSI PLUG BUMPED AT 22.0 BBLS, 3300 PSI (21.7 BBLS CALCULATED) OPEN BAKER CHOKE AND CHECK FLOATS. GOOD TEST. - CLOSE BAKER CHOKE, PRESSURE UP TO 1500 PSI ON COIL, PICK UP AND CONFIRM PRESSURE DROP CEMENT IN PLACE: 20:50 HRS 33.7 BBLS CEMENT BEHIND PIPE, BASED ON MANUALSTRAP, TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE: 0.3 BBLS 21:00 00:00 3.00 CASING P RUNPRD CLEAN UP CEMENT. CIRCULATE 30 BBLS OF EXHAUST ABOVE LINER. SLOWLY PULL WHILE GETTING CEMENTABOVE US. MUD WEIGHT: 8.4 PPG IN, 8.4 PPG OUT RATE: 2.98 BPM IN, 2.71 BPM OUT POH FROM 12800' MD TO SURFACE RATE: 3.05 BPM. CIRC PRESSURE: 1505 PSI PERFORM 10 MIN FLOW CHECK. WELL -- - - - -- - STATIC. 12/30/2016 00:00 00:30 0.50 CASING P RUNPRD LAY DOWN 6 JOINTS OF 2-3/8" PH6 AND LINER RUNNING TOOL - - _ - RECOVERED 5/8" BALL Printed 1/9/2017 10:09:OOAM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 4 of 7 Operation Summary Report Common Well Name: 15-16 i AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/28/2016 End Date: 1/1/2017 X3 -0186W -C: (1,143,907.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:00AM I Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) I I (usft) 00:30 02:30 2.00 iEVAL X DFAL 16,145.00 OTHCMP MAKE UP BOT COIL CONNECTOR, PULL TEST 02:30 - 04:15 1.75 0415 - 04:30 0.25 1.50 1.00 - ! 07:00 08:25 1.42 08:25 10:25 2.00 10:25 12:50 2.42 12:50 - 16:15 3.42 Printed 1/9/2017 10:09:OOAM 'All depths reported in Drillers Depths' I TO 36K, LOW 300 PSI / HIGH 4000 PSI PUT INJECTOR ON LEGS. PREP TO PICKUP LOGGING BHA. PJSM, DISCUSS PICKING UP HYDRIL AND BAKER ATLAS RPM TOOL EVAL X DFAL 16,145.00 OTHCMP CLEANOUT/ LOGGING BHA. FILL PIPE EVERY 30 JOINTS 2.300" MILL 2-1/8" XTREME MOTOR (2) JOINTS 1-1/4" CSH BAKER ATLAS RPM CARRIER DCV (1/2" BALL, 5K BURST DISK) HIGHLOAD DISCONNECT (5/8" BALL) (10) JOINTS 1-1/4" CSH 1-1/4" CSH MARKER PUP (30) JOINTS 1-1/4" CSH EVAL X DFAL 16,145.00 OTHCMP KICK WHILE TRIPPING JOINTED PIPE DRILL. CREW MADE UP SAFETY JOINTAND WERE SPACED OUT. DRILLER SIMULATED CLOSING CORRECT 'BOP COMPONENTS. DRILL WAS CONDUCTED PER STANDING ORDERS EVAL X DFAL 16,145.00 OTHCMP RIG UP HEAD PIN CIRCULATE THROUGH WORK STRING TO FILL PIPE. rtl CONTINUE RUNNING 1-1/4" CSH EVAL X DFAL 16,145.00 OTHCMP (62) 1-1/4" CSH IN. RIG UP SAFETY JOINT/ HEAD PIN. CIRCULATE TO FILL PIPE CREW CHANGE EVACUATE FLUID OUT OF STACK TO PERFORM WEEKLY FUNCTION TEST EVAL X DFAL 16,145.00 OTHCMP MU REMAINING 18 JOINTS OF CSH & UPPER BHA, AND MU INJECTOR EVAL X DFAL 16,145.00 OTHCMP BHA MU, RIH EVAL X DFAL 16,145.00 OTHCMP ON DEPTH, TOOL IS HOT, RIH LOGGING AT 30 FPM TO PBTD AT 1.1 BPM TAG AT 13,050' WITH MOTOR WORK, PU AND WORKDOWN 1.66 BPM AT 2620 PSI HAD TO WORK DOWN TO 13,066 THEN i CLEANED UP EVAL X DFAL 16,145.00 OTHCMP TAG AT 16150.9' UNCORRECTED DRILLING CORRECTIONS HAVE BEEN -21', THIS IS ON DEPTH WITH THE LATCH COLLAR AT 16130' POOH AT 20 FPM PUMPING NEW KCL Printed 1/9/2017 10:09:OOAM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 5 of 7 Operation Summary Report Common Well Name: 15-16 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/28/2016 End Date: 1/1/2017 X3 -0186W -C: (1,143,907.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations _ (hr) — (usft) 16:15 16:30 0.25 EVAL X DFAL 16,145.00 OTHCMP - IMT HAS ASKED ALL WORK TO STOPAND ' WORKERS TO HEAD BACK TO CAMP CALLED WSUP JAY MURPHY AND DISCUSSED OUR SITUATION AND ASKED FOR PERMISSION TO KEEP LOGGING AND MOVING TOWARDS SURFACE UNTIL OR IF THEY CALL PHASE 3 WE HAVE SENT ALL NONESSENTIAL PERSONNEL BACK TO CAMP IN A CONVOY TO REDUCE HEAD COUNT ON THE RIG WE HAVE PERMISSION TO CONTINUE OPS UNTIL PHASE 3 IS CALLED, AT THAT TIME WE WILL SUSPEND ALL OPERATIONS, STOP I POOH AND CIRCULATE AT MINIMUM RATE TO KEEP THE COIL FROM FREEZING 16:30 16:45 0.25 EVAL X DFAL 16,145.00 OTHCMP STOP LOGGING AT 11900', FLOW CHECK, PAINT FLAG THEN POOH EOP FLAG = 9256.2' BIT = 11899.8 16.45 18:10 1.42 EVAL X DFAL 16,145.00 OTHCMP GOOD NO FLOW, POOH 18:10 18:30 0.33 EVAL X DFAL 16,145.00 OTHCMP FLOW CHECK WELL. WELL STATIC. LAY DOWN (2) JTS 2-1/16" CSH JEWELRY DROP 1/2" STEEL BALL. RU HEAD PIN. PRESSURE UP AND SHEAR CIRC SUB. 118:30 PULLAND STAND BACK 1-1/2" CSH. 20:45 2.25 EVAL X DFAL 16,145.00 OTHCMP AT MARKER PUP. PJSM WITH BAKER ATLAS. PULL REMAINING 1-1/4" CSH. —RECOVERED 1/2" STEEL BALL 120:45 00:00 3.25 EVAL X DFAL 16,145.00 OTHCMP LAID DOWN RPM TOOL. DOWNLOAD DATA. BAD DATA -SIMOPS INSTALL NIGHTCAP. TEST LINER 1 LAP. FAILED 0.5 BPM @ 2180# INJECTIVITY PJSM, BRING HALLIBURTON GUNS ON BOARD. LAY OUT GUNS. PREP FLOOR FOR RUNNING PERF GUNS. 12/31/2016 00:00 01:00 1 1.00 PERF P OTHCMP MAKE UP (36) 2" HES MAXFORCE PERF GUNS 01:00 03:10 2.17 PERF P OTHCMP INSTALL FIRING HEAD. MAKE UP REMAINING JEWELRY, RUN GUNS IN ON 1-1/4" CSH WORKSTRING FROM -- - --- DERRICK. 03:10 03:20 0.17 PERF P OTHCMP MAKEUP PERFORATION ASSEMBLY - PRESSURE TEST QTS TO 330 PSI LOW FOR 5 MINUTES / 4500PSI HIGH FOR 5 MINUTES _ - INJECTOR ON: 03:10 03:20 06:00 2.67 PERF P OTHCMP i- RATE: 0.49 BPM IN, 0.93 BPM OUT. CIRC 'PRESSURE: 260 PSI F- MUD WEIGHT: 8.37 PPG IN, 8.41 PPG OUT 06:00 06:30 0.50 PERF P OTHCMP TAG UNCORRECTED PBTD AT 16152' DOWN. PICKUP TO BREAKOVER AT 56KAT 16140'. ESTABLISH A BASE LINE _CREW CHANGE 06:30 07:10 0.67 PERF P OTHCMP START FIRING SEQUENCE TO FIRE GUNS Printed 1/9/2017 10:09:OOAM `All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Page 6 of 7 Common Well Name: 15-16 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/28/2016 End Date: 1/1/2017 X3 -0186W -C: (1,143,907.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 07.10 08:30 1.33 PERF P OTHCMP GUNS FIRED WITH GOOD SHOT DETECTION, PU AND PULLED 78K, ONLINE WITH PUMP HOLDING 200 PSI NO PRESSURE BUILDING, WELL TAKING FLUID STARTING TO BUILD WHIP AFTER -1 MIN OPEN CHOKE TAKING RETURNS HOLDING 1200 PSI PVT = 195 BBLS 08:30 08:40 0.17 PERF P OTHCMP FLOW CHECK WELL 08:40 10:05 1.42 PERF P OTHCMP GOOD NO FLOW, POOH LOST 15 BBLS IN THE FIRST 2000' AND 2 BBLS OVER THE LAST 10,000', SLIGHT LOSSES HOLD A PJSM TO REMOVE THE INJECTOR, PUMP FRESH WATER THROUGH THE CSH WORKSTRING THEN LD IN SINGLES 10:05 10:15 0.17 PERF P OTHCMP FLOW CHECK WELL 10:15 13.10 2.92 PERF P OTHCMP GOOD NO FLOW CHECK, TAG UP, REMOVE THE INJECTOR, DISPLACE CSH WITH FRESH _ WATER TO LAY DOWN SIDEWAYS 13:10 15:20 2.17 PERF P OTHCMP AT THE MARKER JOINT, STOP AND HOLD 1 PJSM TO LD GUNS PULL LAST 10 JOINTS THEN LD GUNS 15:20 - 16:15 0.92 PERF P OTHCMP GUNS OOH, LOAD OUT HANDLING EQUIPMENTAND SPENT GUNS 16:15 16:40 0.42 PERF P OTHCMP PRESSURE WASH RIG FLOOR FROM GUN DEBRIS 116:40 16:55 0.25 CONDHL P POST I PJSM TO MU NOZZLE BHAAND RIH TO _ FREEZE PROTECT 16:55 17:05 0.17 CONDHL P POST PU INJECTOR AND MU NOZZLE BHA 17:05 17:45 0.67 CONDHL P POST RIH TO FREEZE PROTECT WELL 17:45 18:00 0.25 CONDHL P POST POOH LAYING IN DIESEL 18:00 18:05 0.08 CONDHL P POST STOP AT 50' AND CIRCULATE 5 BBLS OF NEAT METH THROUGH TREE __— 1 16.80 PPG DIESELAND 6.61 PPG NEAT METH 1805 19:00 0.92 CONDHL P POST TAGGED UP, SERVICE TREE 19:00 - 00:00 5.00 CONDHL P POST I PICK UP AND CLOSE MASTER / SWAB. PERFORM LTT TO 3500#. START CIRCULATING HOT SOAPY FRESHWATER THROUGH HIGH PRESSURE MANIFOLD AND COIL/ JET BOPE STACK. CIRCULATE THROUGH BOTH PUMPS CYCLE THROUGH ALL FLUID PATHS. RUN RETURNS THROUGH MGS. SIMOPS: OFFLOAD BP OWNED PIPING / !XOVERS SIMOPS: OFFLOAD 1-1/4" HYDRIL 1/1/2017 100:00 02:00 2.00 BOPSUR P POST CONTINUE CIRCULATE FRESH WATER ! THROUGH ALL PIPING AND MGS Printed 1/9/2017 10:09:OOAM 'All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 7 of 7 Common Well Name: 15-16 AFE No Event Type: COM- ONSHORE (CON) Start Date: 12/28/2016 End Date: 1/1/2017 X3 -0186W -C: (1,143,907.00) Project: Prudhoe Bay Site: PB DS 15 Rig Name/No.: NORDIC 2 Spud Date/Time: 6/6/1984 12:00:OOAM Rig Release: 1/1/2017 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: 15-16B @61.00usft (above Mean Sea Level) Date From - To Hrs Task Code 1 NPT NPT Depth ' Phase Description of Operations - 07:00 (hr) 5.00 BOPSUR P -T-POST (-ft) i (-ft)02:00 PREPARE TO PICKLE / BLOWDOWN REEL PT NITROGEN PUMPERS. 250/3600 TEST i j TRIPS AT 3500# PUMP 15 BBLS OF INHIBITED FRESH WATER / 5 BBLS METHANOL. BLOW DOWN BOTH PUMPS PUMPS AND POP OFF LINES COME ONLINE WITH N2. BLOW REEL DOWN. BLOW HP MANIFOLD AND MUD MANIFOLD DOWN _ PREPARE TO PULL COIL BACK 07:00 - 08:00 1.00 _ BOPSUR P POST RD HARDLINE INSIDE REEL PRESSURE WASH RIG FLOOR & SUMP, DRAINS & TROUGHS 08:00 09:00 1.00 BOPSUR P POST REMOVE REEL FROM RIG 109:00 10:00 1.00 DEMOB P POST FINISH CLEANING RIG FLOOR SUMPS THEN REASSEMBLE RIG FLOOR MATS SLB IS REMOVING HARDLINE FROM THE 10:00 - 11:00 1.00 DEMOB P POST REMOVE COIL UNSTABBING CABLE FROM I WINCH AND INSTALL PULL OVER CABLE PU THE INJECTOR, STAB ONTO THE BOP'S TO REMOVE THE PACK OFF AND GOOSENECK THESE 2 PIECES OF THE INJECTOR ARE DIFFICULT TO REMOVE WHEN NOT STABBED ON TO KEEP IT STABLE. 11:00 12:00 1.00 BOPSUR P POST RU SLINGS TO ND BOPE RIG RELEASED FROM 15-16C AND NOW ON DEMOB AFE Printed 1/9/2017 10:09:OOAM *All depths reported in Drillers Depths' 15-16C Well History (Post Rig Sidetrack T/I/O = 0/0/0. RD QTS -01 install 4" tree cap, torque flange to API specs and pt'd to 4000 psi pass. RDMO. 1/8/2017 Final WHPs = 0/0/0 18:30 T/I/10=2497/1292/104, Temp=S/I, Assist Slickline with Freeze Protect Flowline and Possitive Pressure Test on LTP (Assist) Pumped 3 bbls meth spear followed by 96 bbls 1/21/2017 crude and 10 bbls meth tail down flowline for freeze protect. Pumped 125 of the 230 bbl ***WELL FLOWING ON ARRIVAL*** (post-ctd) RAN 3.50" LIB TO DEPLOYMENT SLVAT 12,765' SLM. GOOD IMPRESSION RAN 45KB PACKER/PTSA STINGER DRIFT ASSY TO DEPLOYMENT SLV AT 12765' 1/21/2017 SLM. GOOD MARKS ON BRASS TTLS T/1/0=342/1235/67, Temp=S/I, (LRS 72 - Assist Slickline to test LTP) Pumped 53 bbls crude to establish LLR of 3 BPM @ 2330 psi on LTP. SlickLine set another plug. Pumped 1/22/2017 45 bbls of in attempt to pressure up. Established another LLR of 2.7 BPM @ 2300 psi. ***WSR continued from 1/21/2016. (LRS Unit 72 -Assist slickline: Load and Test) Pumped 105 bbls of crude (230 total) to load TBG. Slickline set LTP. LRS pump unit pulled off job due to GC2 upset). 1/22/2017 FWHP= 0/1265/97 Valves= slickline ***CONT FROM 1-21-17 WSR*** (ctd) BRUSHED DEPLOYMENT SLEEVE @ 12,801' MD W/ 3.25 GAUGE RING & 3-1/2" BRUSH. LRS LOADED TBG W/ 230 BBLS OF CRUDE.(see Irs log) SET BAKER 45KB LTP W/ PTSAASSY IN DEPLOYMENT SLEEVE @ 12,801' MD. LRS PERFORMED FAILING PRESSURE TEST ON LTP ASSY.(see Irs log) EQUALIZED & PULLED 2-7/8" XX PLUG W/ RGS FROM LTP ASSY @ 12,801' MD 1/22/2017 SET 2 1/8" XX -PLUG IN PTSA STINGER AT 12801' MD. P/T FAILED AGAIN ***CONT FROM 1-22-17 WSR*** SET LTTP IN PACKER AT 12801' MD. LRS ACHIEVED A PASSING PRESSURE TEST TO 2400# PULLED LTTP FROM PACKER AT 12801' MD. PULLED 2-7/8" XX PLUG FROM PTSAASSY @ 12,801' MD. PULLED BAKER 45KB LTP FROM DEPLOYMENT SLEEVE @ 12,801' MD. 1/23/2017 RAN 45KB PACKER AND PTSA DRIFT TO PEDLOYMENT SLEEVE @ 12801' MD T/1/0=309/1189/31 Temp=Sl (LRS #42 - assist slickline as directed) Pumped 25 bbls crude down TBG to confirm injectivity. Called off job to FP wells due to GC -2 issues. 1/23/2017 SSL in control of well @ departure. FWHP= 260/1175/28 T/I/0= 260/1175/28 Temp= S/I Assist SSL (CTD) Arrive on location, Sign in with SSL 1/23/2017 and spot equipment, Pumping delayed, No fluids pumped, End ticket. ***WSR continued from 1/22/2107*** Pumped 4.5 bbls of ambient crude down TBG to test LTP test plug to 2500 psi (PASSED). 1 st 15 min TBG lost 125 psi, 2nd 15 min TBG lost 44 psi, for a total loss of 169 psi in 30 min. Bled back 4-5 bbls of crude. SL pull test plug. Pumped additional 35.5 1/23/2017 bbls crude to establish a LLR of 2.4 BPM @ 2360 psi. Slickline on well upon departure. 15-16C Well History (Post Rig Sidetrack ***CONT FROM 1-23-17 WSR*** (CTD) RAN PTSA STINGER DRIFT ON A BAIT SUB WITH GR. DRIFT HAS SAME MARKS AS PTSA RAN PREVIOUSLY. RAN 3-1/2" BRUSH & BAR MAGNET TO DEPLOYMENT SLEEVE @ 12,801' MD.(fine shavings on magnet) BRUSHED DEPLOYMENT SLEEVE @ 12,801' MD W/ 3.25" GAUGE RING, 4-1/2" BRUSH & 3-1/2" BRUSH. LRS PUMPED 30 BBLS OF CRUDE DOWN TBG FOR BRUSH RUN.(see Irs log) RAN 45KB LTP W/ PTSA STINGER TO DEPLOYMENT SLEEVE @ 12,801' MD.(scrapes on ptsa) RAN 3.76" CENT BARBELL & 3.70" LIB TO DEPLOYMENT SLEEVE @ 12,801' MD. (inconclusive) RAN 3.70" CENT, 10'x 1-1/2" WB, 2.80" CENT & 2.50" LIB TO 12,766' SLM (LIB has no 1/24/2017 impression, CENT has ring around the btm) T/1/0=445/11776/30 Assist Slickline [Obj: Post CTD] Pumped 61 bbls crude down 1/24/2017 TBG, SSL in control of well @ departure, FWHP- 390/1154/25 ***CONT FROM 1-25-17 WSR*** (ctd / set Itp) SET 4 1/2" DREAM CATCHER ON 4 1/2" X -LOCK IN X -NIPPLE AT 12139' MD RAN 4 1/2" CHECK SET TO DREAM CATCHER AT 12139' MD (Sheared) 1/25/2017 ***WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED OF STATUS*** ***WELL FLOWING ON ARRIVAL*** (post-ctd). R/U SWCP 4522 TO SET LINER TOP PACKER. 1/26/2017 ***CONTINUE ON 1-27-17 WSR (job in progress). T/1/0=2514/1760/300 Temp=S1 Assist slickline with tbg and flowline FP. Pumped 2 bbls 1/26/2017 of methanol and 38 bbls of crude down the tbg to FP. ***CONTINUED FROM 1-26-17 WSR (post-ctd). PULLED 4-1/2" DREAM -CATCHER FROM 12,139' MD (empty). RAN 3.75" BARBELL W/ 3.00" TAPPERED LIB TO DEPLOYMENT SLEEVE @ 12,801' MD.(lib inconclusive) RAN 45 KB LTP DRIFT, 10'x 2-7/8" PUP & PTSA STINGER TO DEPLOYMENT SLEEVE @ 12,801' MD.(bottom tt pin sheared) RAN BAITED PTSA STINGER DRIFT TO 3.70" DEPLOYMENT SLV @ 12,801' MD (unable to sting into deploy slv). RAN 4-1/2" GR TO DEPLOYMENT SLV @ 12,801' MD (able to latch deploy slv). DRIFT TO 3-1/2" X -NIPPLE @ 12,822' MD W/ 2.87" CENT, 2-1/2" SAMPLE BAILER (no issues or sample). RAN DMY 45 KB PACKER DRIFT W/ QCLL MANDREL / STINGER TO 3.70" 1/27/2017 DEPLOYMENT SLV @ 12,801' MD (no-go has partial ring, metal scaring on stinger). ** WSR continued from 1-26-17** Assist slickline with tbg and flowline freeze protect. Pumped 4 bbls of methanol and 97 bbls of crude down the FL to FP. Pressure flowline to 1500 psi per DSO. 1/27/2017 FWHP= 1720/1760/300 SV,WV,SSV=closed IA,OA=OTG ***CONTINUED FROM 1-27-17 WSR (post-ctd). R/D SWCP 4522 1/28/2017 ***WELL S/I ON DEPARTURE***(pad op notified= job incomplete, well & well head ***WELL S/I ON ARRIVAL*** (profile -mod). DRIFTED WITH 2.74" CENT, 2-1/2" SAMPLE BAILER TO 13,000' SLM RAN 24 ARM PDS CALIPER PER PROGRAM (logged from 12,850' slm up to 12,000' slm, Good data). 1/29/2017 ***WELL S/I ON DEPARTURE*** (pad op notified= job complete, well & well head 15-16C Well History (Post Rig Sidetrack CTU #14 - 1.75" Coil Job Objective: Dress Liner Top, Set Liner Top Packer MIRU CTU. MU 3" polished mill BHA. Pump 325 bbis of safelube down BS. RIH to 12,767' and dry tag. RIH and mill between 12766 - 12767.4'a total of 3 times. Consistent stalls indicate the BHA is no -going as per design. POOH to surface. Pump 10 bbls cap down BS. Good indication of top of deployment sleeve on mill. Make up KB packer and PTSA drift and RIH. Only slight pressure indication of seal engagement due 2/1/2017 to low pump rates, 0.7 bpm at 1770 psi, however we could see —2-3 feet of PBR CTU #14 - 1.75" Coil Job Objective: Dress Liner Top, Set LTP Inspect LTP and PTSA drift and find all 4 tattle tales sheared, good indication of full engagement. Make up LTP BHA with X -nipple PSA and X -lock retrievable guide shoe without plug. RIH. Set LTP, good pressure test down backside. Top of 45 KB Hydro -Bird Packer set at 12791.49'. POOH. OOH with setting tool, all looks normal, ball recovered. Make up and RIH with 2-1/2" GS BHA. At 6900 while RIH, WHP broke over while it was 2/2/2017 stabilized at — 1600psi. Inform DSO well will need DPB to POP. CTU#14 1.75" CT Job Objective: Dress Deployment Slv, Set LTP Finish Rig Down. Depart to 03-22. 2/3/2017 ***Job Complete*** North America - ALASKA - BP Prudhoe Bay PB DS 15 15-16 15-16CPB1 500292111571 Design: 15-16CPB1 Final Survey Report 03 January, 2017 BAKER HUGHES BP Final Survey Report WE Flu BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB1 Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 Database: EDM R5K-Alaska PROD -ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY 15-16C PB 1 Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 * OGP-UsaAK [4267'15864] Dip Angle Field Strength Using Well Reference Point Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor BG G M2016 1/1/2017 18.14 Site PB DS 15, TR -11-14 Site Position: Northing: 5,958,837.360 usft Latitude: 70° 17' 35.236 N From: Map Easting: 676,296.980 usft Longitude: 148° 34'21.213 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.34 ° Well 15-16, 15-16 Well Position +N/ -S 0.00 usft Northing: 5,960,630.760 usft Latitude: 70° 17' 52.919 N +E/ -W 0.00 usft Easting: 676,088.190 usft Longitude: 148° 34'26.072 W Position Uncertainty 0.00 usft Wellhead Elevation: 36.02 usft Ground Level: 33.16 usft Wellbore 15-16C PB 1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BG G M2016 1/1/2017 18.14 81.02 57,558 Design 15-16CPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 13,281.94 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (I 24.98 0.00 0.00 90.00 1/3/2017 4:28:52PM Page 2 COMPASS 5000.1 Build 81B V�� BP r>/FAa Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Inc Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay N/S TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 DLeg MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 (usft) North Reference: True Wellbore: 15-16CPB1 (usft) Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 0.00 Database: EDM R5K - Alaska PROD - ANCP1 Survey Program Date 1/3/2017 0.00 0.00 5,960,630.760 From To 0.00 90.00 0.37 (usft) (usft) Survey (Wellbore) Tool Name Description -0.21 90.00 4,540.00 15-16 Srvy 2 GYD CT CMS (15-16) GYD-CT-CMS Gyrodata cont.casing m/s 0.57 4,587.00 4,604.00 15-16BPB1 Srvy 1 Blind (15-16BPB1) BLIND Blind drilling 190.00 4,626.54 4,720.47 15-16BPB1 Srvy 2 Inc+Trend (15-16BPB1 INC+TREND Inclinometer + known azi trend 5,960,629.883 4,813.93 12,335.13 15-16BPB1 Srvy 3 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 0.36 12,409.41 12,912.00 15-16BPB1 Srvy 4 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal -1.' 4 12,938.02 13,281.94 15-16B Srvy 1 MWD+IFR+MS (15-16B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 0.17 - 13,288.00 13,935.72 15-16CPB1 CTK MWD 4-1/4" (15-16CPB1 MWD MWD - Standard 389.99 Survey -2.20 0.37 5,960,628.476 MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) 24.98 0.00 0.00 24.98 -36.02 0.00 0.00 5,960,630.760 676,088.190 0.00 90.00 0.37 179.86 90.00 29.00 -0.21 0.00 5,960,630.550 676,088.195 0.57 190.00 0.43 158.08 190.00 129.00 -0.88 0.14 5,960,629.883 676,088.352 0.16 290.00 0.36 180.27 289.99 228.99 -1.' 4 0.28 5,960,629.224 676,088.506 0.17 390.00 0.51 168.24 389.99 328.99 -2.20 0.37 5,960,628.476 676,088.613 0.17 490.00 0.43 179.07 489.99 428.99 -3.'410 0.47 5,960,627.668 676,088.729 0.12 590.00 0.49 164.12 589.99 528.99 -3.89 0.59 5,960,626.885 676,088.870 0.13 690.00 0.41 178.64 689.98 628.98 -4.66 0.71 5,960,626.119 676,089.014 0.14 790.00 0.12 121.30 789.98 728.98 -5.07 0.81 5,960,625.709 676,089.121 0.36 890.00 0.37 81.65 889.98 828.98 -5.08 1.22 5,960,625.711 676,089.530 0.29 990.00 0.43 85.77 989.98 928.98 -5.00 1.92 5,960,625.802 676,090.222 0.07 1,090.00 0.32 93.93 1,089.98 1,028.98 -5.00 2.57 5,960,625.826 676,090.874 0.12 1,190.00 0.30 72.48 1,189.97 1,128.97 -4.94 3.10 5,960,625.898 676,091.401 0.12 1,290.00 0.40 81.01 1,289.97 1,228.97 -4.80 3.69 5,960,626.045 676,091.992 0.11 1,390.00 0.40 115.46 1,389.97 1,328.97 -4.90 4.35 5,960,625.965 676,092.654 0.24 1,490.00 0.31 96.64 1,489.97 1,428.97 -5.08 4.93 5,960,625.797 676,093.242 0.15 1,590.00 0.46 131.91 1,589.97 1,528.97 -5.38 5.50 5,960,625.511 676,093.816 0.27 1,690.00 0.41 126.75 1,689.96 1,628.96 -5.86 6.09 5,960,625.043 676,094.413 0.06 V. Sec (usft) 0.00 0.00 0.14 0.28 0.37 0.47 0.59 0.71 0.81 1.22 1.92 2.57 3.10 3.69 4.35 4.93 5.50 6.09 1/3/2017 4:28:52PM Page 3 COMPASS 5000.1 Build 81B Vwood b BP rO.I p Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB1 Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) V) C) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 1,790.00 0.28 164.95 1,789.96 1,728.96 -6.31 6.44 5,960,624.601 676,094.773 0.26 6.44 1,890.00 0.34 163.56 1,889.96 1,828.96 -6.83 6.58 5,960,624.085 676,094.933 0.06 6.58 1,990.00 0.53 67.10 1,989.96 1,928.96 -6.94 7.09 5,960,623.992 676,095.445 0.66 7.09 2,090.00 0.64 69.28 2,089.95 2,028.95 -6.56 8.04 5,960,624.392 676,096.384 0.11 8.04 2,190.00 0.60 82.25 2,189.95 2,128.95 -6.29 9.08 5,960,624.684 676,097.419 015 9.08 2,290.00 0.86 153.02 2,289.94 2,228.94 -6.89 9.94 5,960,624.106 676,098.292 0.87 9.94 2,390.00 0.96 160.89 2,389.93 2,328.93 -8.35 10.56 5,960,622.661 676,098.941 0.16 10.56 2,485.00 0.89 153.98 2,484.92 2,423.92 -9.77 11.14 5,960,621.258 676,099.559 0.14 11.14 13 3/8" 2,490.00 0.89 153.59 2,489.92 2,428.92 -9.84 11.18 5,960,621.189 676,099.595 0.14 11.18 2,590.00 1.43 24.44 2,589.90 2,528.90 -9.40 12.04 5,960,621.649 676,100.446 2.11 12.04 2,690.00 4.99 19.36 2,689.73 2,628.73 -4.16 14.00 5,960,626.934 676,102.281 3.57 14.00 2,790.00 6.55 12.61 V 2,789.22 2,728.22 5.51 16.69 5,960,636.664 676,104.741 1.70 16.69 2,890.00 8.25 7.65 2,888.39 2827 39 18.19 18.89 5,960,649.389 676,106.644 1.81 18.89 2,990.00 9.99 13.86 2,987.12 2,926.12 33.7S 21.92 5,960,664.988 676,109.312 2.00 21.92 3,090.00 11.39 28.91 " "='3,085.40 3,024.40 50.8; 28.77 5,960,682.212 676,115.763 3.11 28.77 3,190.00 12.85 35.21 3,183.18 3,122.18 68.53 39.96 5,960,700.199 676,126.530 1.97 39.96 3,290.00 13.38 25.23 3,280.58 3,219.58 88.08 51.30 5,960,720.013 676,137.412 2.32 51.30 3,340.00 14.04 24.08 3,329.16 3,268.16 98.85 56.24 5,960,730.896 676,142.099 1.43 56.24 3,390.00 14.79 23.96 3,377.58 3,316.58 110.22 61.31 5,960,742.380 676,146.897 1.50 61.31 3,440.00 15.54 24.87 3,425.84 3,364.84 122.13 66.72 5,960,754.412 676,152.025 1.57 66.72 3,490.00 16.40 26.22 3,473.91 3,412.91 134.54 72.65 5,960,766.956 676,157.668 1.87 72.65 3,540.00 17.20 27.38 3,521.78 3,460.78 147.44 79.17 5,960,780.001 676,163.882 1.73 79.17 3,590.00 18.81 29.52 3,569.33 3,508.33 161.02 86.55 5,960,793.749 676,170.933 3.48 86.55 3,640.00 20.34 30.37 3,616.43 3,555.43 175.53 94.91 5,960,808.453 676,178.956 3.11 94.91 3,690.00 21.45 31.12 3,663.15 3,602.15 190.85 104.03 5,960,823.986 676,187.713 2.28 104.03 3,740.00 22.83 31.56 3,709.46 3,648.46 206.95 113.83 5,960,840.302 676,197.135 2.78 113.83 1/3/2017 4:28:52PM Page 4 COMPASS 5000.1 Build 81B VbpBP FGh9 Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB1 Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°l100usft) (usft) 3,790.00 24.12 31.76 3,755.32 3,694.32 223.90 124.29 5,960,857.494 676,207.189 2.58 124.29 3,840.00 25.64 31.75 3,800.68 3,739.68 241.78 135.36 5,960,875.634 676,217.837 3.04 135.36 3,890.00 27.86 31.39 3,845.32 3,784.32 260.96 147.14 5,960,895.078 676,229.162 4.45 147.14 3,940.00 29.43 31.59 3,889.20 3,828.20 281.40 159.66 5,960,915.802 676,241.200 3.15 159.66 3,990.00 31.04 31.61 3,932.40 3,871.40 302.84 172.85 5,960,937.547 676,253.885 3.22 172.85 4,040.00 32.33 31.79 3,974.95 3,913.95 325.18 186.65 5,960,960.207 676,267.158 2.59 186.65 4,090.00 33.53 32.30 4,016.91 3,955.91 348.22 201.07 5,960,983.574 676,281.036 2.46 201.07 4,140.00 34.98 32.84 4,058.24 3,997.24 371.94 216.23 5,961,007.637 676,295.627 2.96 216.23 4,190.00 36.31 33.17 4,098.87 4,037.87 396.37 232.10 5,961,032.435 676,310.922 2.69 232.10 4,240.00 38.51 33.62 4,138.58 4,077.58 421.73 248.82 5,961,058.175 676,327.043 4.43 248.82 4,290.00 40.39 33.70 4,177.19 4,116.19 448.17 266.43 5,961,085.021 676,344.026 3.76 266.43 4,340.00 42.01 33.81 4,214.81 4,153.81 475.55 284.73 5,961,112.822 676,361.678 3.24 284.73 4,390.00 43.50 33.74 4,251.52 4,190.52 503.77 303.60 5,961,141.468 676,379.880 2.98 303.60 4,440.00 44.46 33.81 4,287.50 4,226.50 532.63 322.90 5,961,170.771 676,398.499 1.92 322.90 4,490.00 45.45 33.90 4,322.88 4,261.88 561.96 342.58 5,961,200.559 676,417.486 1.98 342.58 4,540.00 47.24 34.25 4,357.40 4,296.40 591.93 362.85 5,961,230.986 676,437.045 3.62 362.85 4,587.00 49.09 34.55 4,388.74 4,327.74 620.82 382.63 5,961,260.332 676,456.146 3.96 382.63 9 518" 4,604.00 49.90 37.00 4,399.79 4,338.79 631.30 390.19 5,961,270.990 676,463.455 11.95 390.19 4,626.54 49.22 38.00 4,414.41 4,353.41 644.91 400.63 5,961,284.840 676,473.575 4.53 400.63 4,720.47 51.78 43.80 4,474.18 4,413.18 699.60 448.10 5,961,340.626 676,519.742 5.49 448.10 4,813.93 56.37 48.05 4,529.02 4,468.02 752.16 502.49 5,961,394.434 676,572.886 6.14 502.49 4,906.86 59.65 44.78 4,578.25 4,517.25 806.51 559.53 5,961,450.102 676,628.638 4.62 559.53 5,003.33 62.85 48.04 4,624.66 4,563.66 864.78 620.80 5,961,509.787 676,688.516 4.45 620.80 5,096.00 65.42 41.60 4,665.11 4,604.11 923.91 679.49 5,961,570.279 676,745.804 6.84 679.49 5,193.19 66.05 41.60 4,705.05 4,644.05 990.17 738.32 5,961,637.892 676,803.058 0.65 738.32 5,286.33 66.86 41.77 4,742.26 4,681.26 1,053.94 795.10 5,961,702.967 676,858.329 0.89 795.10 1/3/2017 4:28:52PM Page 5 COMPASS 5000.1 Build 81B Vpb BP riFAa Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB1 Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft (usft) 5,378.55 66.00 40.77 4,779.14 4,718.14 1,117.46 850.86 5,961,767.779 676,912.576 1.36 850.86 5,472.62 64.46 39.04 4,818.55 4,757.55 1,182.98 905.65 5,961,834.553 676,965.820 2.34 905.65 5,570.80 65.40 38.90 4,860.15 4,799.15 1,252.12 961.58 5,961,904.981 677,020.109 0.97 961.58 5,666.46 63.33 38.54 4,901.54 4,840.54 1,319.40 1,015.53 5,961,973.506 677,072.460 2.19 1,015.53 5,757.98 63.20 38.03 4,942.71 4,881.71 1,383.56 1,066.17 5,962,038.828 677,121.581 0.52 1,066.17 5,852.93 63.06 39.82 4,985.63 4,924.63 1,449.45 1,119.38 5,962,105.942 677,173.232 1.69 1,119.38 5,947.04 63.90 43.51 5,027.66 4,966.66 1,512.33 1,175.36 5,962,170.116 677,227.712 3.62 1,175.36 6,041.27 64.55 44.66 5,068.63 5,007.63 1,573.28 1,234.39 5,962,232.428 677,285.300 1.30 1,234.39 6,136.26 64.38 47.07 5,109.59 5,048.59 1,632.96 1,295.90 5,962,293.529 677,345.389 2.30 1,295.90 6,230.93 65.05 46.45 5,150.02 5,089.02 1,691.60 1,358.26 5,962,353.611 677,406.351 0.92 1,358.26 6,259.71 65.49 46.48 5,162.06 5,101.06 1,709.61 1,377.21 5,962,372.054 677,424.873 1.53 1,377.21 6,318.80 67.15 45.22 5,185.79 5,124.79 1,747.30 1,416.03 5,962,410.645 677,462.800 3.42 1,416.03 6,368.92 63.86 46.23 5,206.57 5,145.57 1,779.14 1,448.68 5,962,443.237 677,494.691 6.82 1,448.68 6,410.76 61.23 46.69 5,225.86 5,164.86 1,804.71 1,475.59 5,962,469.434 677,520.992 6.36 1,475.59 6,504.67 61.20 47.28 5,271.08 5;210.08 1,860.86 1,535.77 5,962,526.973 677,579.836 0.55 1,535.77 6,596.18 61.28 48.08 5,315.11 5,254.11 1,914.87 1,595.08 5,962,582.354 677,637.865 0.77 1,595.08 6,699.05 61.46 47.28 5,364.40 5,303.40 1,975.66 1,661.84 5,962,644.689 677,703.179 0.70 1,661.84 6,796.68 61.11 47.94 5,411.31 5,350.31 2,033.39 1,725.08 5,962,703.876 677,765.043 0.69 1,725.08 6,886.49 61.53 47.54 5,454.41 5,393.41 2,086.37 1,783.39 5,962,758.211 677,822.094 0.61 1,783.39 6,980.91 60.83 46.42 5,499.93 5,438.93 2,142.81 1,843.88 5,962,816.045 677,881.233 1.28 1,843.88 7,075.82 62.24 46.48 5,545.16 5,484.16 2,200.29 1,904.35 5,962,874.927 677,940.337 1.49 1,904.35 7,170.28 61.35 44.92 5,589.81 5,528.81 2,258.43 1,963.92 5,962,934.436 677,998.532 1.73 1,963.92 7,264.26 61.13 43.53 5,635.03 5,574.03 2,317.46 2,021.39 5,962,994.798 678,054.591 1.32 2,021.39 7,357.92 64.10 44.99 5,678.10 5,617.10 2,377.00 2,079.43 5,963,055.680 678,111.219 3.46 2,079.43 7,453.73 66.20 45.16 5,718.37 5,657.37 2,438.40 2,140.98 5,963,118.491 678,171.312 2.20 2,140.98 7,548.68 66.40 45.16 5,756.53 5,695.53 2,499.70 2,202.63 5,963,181.220 678,231.504 0.21 2,202.63 7,643.91 66.66 45.51 5,794.46 5,733.46 2,561.10 2,264.76 5,963,244.059 678,292.171 0.43 2,264.76 1/3/2017 4:28:52PM Page 6 COMPASS 5000.1 Build 81B bood BP //.�� , p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-168 @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CP61 Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey -- -- -- - MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 7,734.70 66.23 45.30 5,830.74 5,769.74 2,619.54 2,324.02 5,963,303.859 678,350.045 0.52 2,324.02 7,829.73 66.95 45.54 5,868.50 5,807.50 2,680.75 2,386.14 5,963,366.505 678,410.706 0.79 2,386.14 7,924.91 66.18 45.79 5,906.35 5,845.35 2,741.78 2,448.60 5,963,428.977 678,471.717 0.84 2,448.60 8,022.53 66.32 45.30 5,945.67 5,884.67 2,804.35 2,512.38 5,963,493.028 678,534.009 0.48 2,512.38 8,116.99 65.94 44.40 5,983.89 5,922.89 2,865.59 2,573.30 5,963,555.673 678,593.473 0.96 2,573.30 8,210.59 65.92 43.97 6,022.07 5,961.07 2,926.88 2,632.86 5,963,618.331 678,651.581 0.42 2,632.86 8,303.68 66.06 43.13 6,059.94 5,998.94 2,988.51 2,691.45 5,963,681.314 678,708.705 0.84 2,691.45 8,397.95 65.51 42.44 6,098.61 6,037.61 3,051.60 2,749.85 5,963,745.758 678,765.605 0.89 2,749.85 8,490.59 65.38 41.74 6,137.11 6,076.11 3,114.13 2,806.33 5,963,809.589 678,820.601 0.70 2,806.33 8,584.52 65.53 39.71 6,176.13 6,115.13 3,178.88 2,862.07 5,963,875.621 678,874.806 1.97 2,862.07 8,678.96 65.55 38.62 6,215.24 6,154.24 3,245.53 2,916.36 5,963,943.520 678,927.516 1.05 2,916.36 8,776.77 65.64 38.11 6,255.65 6,194.65 3,315.37 2,971.64 5,964,014.629 678,981.143 0.48 2,971.64 8,872.08 65.77 39.26 6,294.87 6,233.87 3,383.18 3,025.94 5,964,083.686 679,033.832 1.11 3,025.94 8,966.07 9,059.53 65.72 65.45 40.92 41.68 6,333.48 ter'. 6,372.11 6,72.48 6311.11 3,448.73 3,512.67 3,081.12 3,137.29 5,964,150.512 5,964,215.740 679,087.460 679,142.110 1.61 3,081.12 a 0.79 3,137.29 9,153.43 65.49 41.05 6,411.09 6150.09 3,576.78 3,193.74 5,964,281.154 679,197.041 0.61 3,193.74 9,247.90 65.39 40.28 6,450.36 6,389.36 3,641.95 3,249.73 5,964,347.618 679,251.485 0.75 3,249.73 9,343.13 65.39 39.26 6,490.02 6,429.02 3,708.50 3,305.11 5,964,415.439 679,305.292 0.97 3,305.11 9,436.42 65.42 39.65 6,528.85 6,467.85 3,773.99 3,359.02 5,964,482.175 679,357.643 0.38 3,359.02 9,531.09 65.49 39.44 6,568.17 6,507.17 3,840.40 3,413.85 5,964,549.843 679,410.897 0.21 3,413.85 9,624.40 65.35 38.85 6,606.99 6,545.99 3,906.21 3,467.41 5,964,616.884 679,462.904 0.59 3,467.41 9,718.66 65.40 38.86 6,646.26 6,585.26 3,972.94 3,521.17 5,964,684.849 679,515.079 0.05 3,521.17 9,812.95 65.32 38.39 6,685.57 6,624.57 4,039.89 3,574.67 5,964,753.036 679,566.990 0.46 3,574.67 9,908.17 65.45 39.06 6,725.24 6,664.24 4,107.43 3,628.82 5,964,821.817 679,619.544 0.65 3,628.82 10,002.84 65.73 39.81 6,764.36 6,703.36 4,174.01 3,683.58 5,964,889.658 679,672.725 0.78 3,683.58 10,097.24 66.79 41.45 6,802.37 6,741.37 4,239.58 3,739.85 5,964,956.528 679,727.439 1.95 3,739.85 10,193.30 66.02 43.10 6,840.82 6,779.82 4,304.72 3,799.06 5,965,023.027 679,785.103 1.77 3,799.06 1/3/2017 4,28 52PM Page 7 COMPASS 5000. 1 Build 8 1 B BP rrl.w by Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB1 Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 10,286.68 65.22 45.46 6,879.37 6,818.37 4,365.61 3,858.43 5,965,085.288 679,843.027 2.46 3,858.43 10,381.40 65.65 45.37 6,918.75 6,857.75 4,426.08 3,919.79 5,965,147.177 679,902.944 0.46 3,919.79 10,476.11 65.93 45.43 6,957.58 6,896.58 4,486.73 3,981.29 5,965,209.250 679,963.007 0.30 3,981.29 10,569.67 65.90 45.52 6,995.77 6,934.77 4,546.62 4,042.19 5,965,270.551 680,022.479 0.09 4,042.19 10,664.13 65.90 45.38 7,034.34 6,973.34 4,607.11 4,103.64 5,965,332.460 680,082.489 0.14 4,103.64 10,757.63 63.84 44.46 7,074.04 7,013.04 4,667.05 4,163.41 5,965,393.772 680,140.837 2.38 4,163.41 10,853.14 60.04 43.42 7,118.96 7,057.96 4,727.71 4,221.89 5,965,455.790 680,197.878 4.09 4,221.89 10,947.88 57.26 40.47 7,168.25 7,107.25 4,787.86 4,275.98 5,965,517.179 680,250.540 3.96 4,275.98 11,039.80 53.73 39.27 7,220.32 7,159.32 4,845.97 4,324.54 5,965,576.413 680,297.724 3.99 4,324.54 11,135.27 51.98 36.23 7,277.97 7,216.97 4,906.11 4,371.14 5,965,637.627 680,342.896 3.13 4,371.14 11,228.64 51.31 33.78 7,335.92 7,274.92 4,966.08 4,413.14 5,965,698.552 680,383.479 2.18 4,413.14 11,323.20 50.84 31.00 7,395.34 7,334.34 5,028.18 4,452.55 5,965,761.559 680,421.415 2.34 4,452.55 11,417.12 49.15 29.95 7,455.71 7,394.71 5,090.18 4,489.04 5,965,824.388 680,456.441 1.99 4,489.04 11,512.52 46.22 28.86 7,519.93 7,458.93 5,151.62 4,523.68 5,965,886.619 680,489.635 3.19 4,523.68 11,607.94 43.19 28.33 7,587.74 7,526.74 5,210.54 4,555.81 5,965,946.277 680,520.373 3.20 4,555.81 11,700.55 40.75 26.16 7,656.55 7,595.59 5,265.58 4,584.18 5,966,001.960 680,547.445 3.07 4,584.18 11,795.50 37.26 20.32 7,730.39 7,669.39 5,320.38 4,607.84 5,966,057.301 680,569.812 5.33 4,607.84 11,890.04 33.52 15.98 7,807.46 7,746.46 5,372.34 4,624.98 5,966,109.645 680,585.723 4.76 4,624.98 11,984.92 34.83 15.02 7,885.96 7,824.96 5,423.70 4,639.21 5,966,161.318 680,598.749 1.49 4,639.21 12,079.57 34.93 14.55 7,963.61 7,902.61 5,476.04 4,653.02 5,966,213.958 680,611.331 0.30 4,653.02 12,173.85 35.46 17.28 8,040.66 7,979.66 5,528.28 4,667.93 5,966,266.532 680,625.007 1.76 4,667.93 12,268.00 34.76 18.75 8,117.68 8,056.68 5,579.77 4,684.67 5,966,318.401 680,640.535 1.17 4,684.67 12,335.13 34.68 17.99 8,172.85 8,111.85 5,616.06 4,696.72 5,966,354.956 680,651.730 0.66 4,696.72 12,398.00 34.74 17.59 8,224.54 8,163.54 5,650.14 4,707.66 5,966,389.288 680,661.866 0.37 4,707.66 7" 12,409.41 34.75 17.52 8,233.91 8,172.91 5,656.34 4,709.62 5,966,395.532 680,663.682 0.37 4,709.62 12,439.21 34.56 17.51 8,258.42 8,197.42 5,672.50 4,714.72 5,966,411.806 680,668.401 0.64 4,714.72 1/3/2017 4:28:52PM Page 8 COMPASS 5000.1 Build 81B BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-166 @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB1 Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 Database: EDM R5K - Alaska PROD - ANCP1 Fel FSa BAKER HUGHES Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 12,470.89 37.18 15.35 8,284.09 8,223.09 5,690.31 4,719.96 5,966,429.726 680,673.221 9.18 4,719.96 12,503.45 40.47 13.47 8,309.46 8,248.46 5,710.08 4,725.02 5,966,449.608 680,677.823 10,73 4,725.02 12,534.30 39.83 12.73 8,333.04 8,272.04 5,729.45 4,729.53 5,966,469.080 680,681.877 2.59 4,729.53 12,567.14 41.78 8.81 8,357.90 8,296.90 5,750.53 4,733.53 5,966,490.242 680,685.376 9.80 4,733.53 12,598.01 45.60 7.12 8,380.22 8,319.22 5,771.64 4,736.47 5,966,511.418 680,687.823 12.94 4,736.47 12,629.48 45.23 7.03 8,402.31 8,341.31 5,793.88 4,739.23 5,966,533.718 680,690.062 1.19 4,739.23 12,661.36 47.37 4.19 8,424.34 8,363.34 5,816.82 4,741.47 5,966,556.695 680,691.766 9.30 4,741.47 12,692.54 51.10 1.51 8,444.69 8,383.69 5,840.39 4,742.63 5,966,580.293 680,692.372 13.62 4,742.63 12,723.54 50.73 1.56 8,464.24 8,403.24 5,864.45 4,743.28 5,966,604.354 680,692.452 1.20 4,743.28 12,755.41 50.67 1.34 8,484.42 8,423.42 5,889.10 4,743.90 5,966,629.015 680,692.499 0.57 4,743.90 12,787.08 53.01 1.18 8,503.99 8,442.99 5,914.00 4,744.45 5,966,653.913 680,692.462 7.40 4,744.45 12,818.21 58.28 0.83 8,521.55 8,460.55 5,939.68 4,744.90 5,966,679.601 680,692.308 16.95 4,744.90 12,850.06 59.27 1.28 8,538.06 8,477.06 -„ 5,966.91 4,745.40 5,966,706.835 680,692.172 3.33 4,745.40 12,881.58 62.72 359.99 8,553.34 8,492.34 5,994.0 4,745.70 5,966,734.393 680,691.827 11.52 4,745.70 12,912.00 66.73 359.42 8,566.33 8,505.33 1 6,021.0 4,745.55 5,966,761.882 680,691.038 13.29 4,745.55 4 1/2" 12,938.02 66.96 0.31 8,576.56 8,515.56 6,045.90 4,745.50 5,966,785.796 680,690.422 3.27 4,745.50 12,969.25 62.70 358.81 8,589.84 8,528.84 6,074.16 4,745.29 5,966,814.038 680,689.549 14.32 4,745.29 13,000.02 65.52 355.30 8,603.28 8,542.28 6,101.79 4,743.86 5,966,841.631 680,687.470 13.76 4,743.86 13,032.34 68.81 354.07 8,615.82 8,554.82 6,131.45 4,741.09 5,966,871.210 680,684.014 10.77 4,741.09 13,062.36 72.07 353.91 8,625.87 8,564.87 6,159.57 4,738.13 5,966,899.259 680,680.394 10.87 4,738.13 13,092.77 75.99 351.48 8,634.24 8,573.24 6,188.56 4,734.41 5,966,928.152 680,675.994 15.01 4,734.41 13,124.60 78.73 351.17 8,641.20 8,580.20 6,219.26 4,729.72 5,966,958.732 680,670.591 8.66 4,729.72 13,156.96 79.16 351.10 8,647.40 8,586.40 6,250.64 4,724.83 5,966,989.987 680,664.963 1.35 4,724.83 13,187.96 79.46 351.23 8,653.16 8,592.16 6,280.74 4,720.15 5,967,019.967 680,659.581 1.05 4,720.15 13,219.79 79.60 351.18 8,658.94 8,597.94 6,311.68 4,715.37 5,967,050.777 680,654.072 0.47 4,715.37 13,251.13 79.81 350.82 8,664.54 8,603.54 6,342.13 4,710.54 5,967,081.109 680,648.536 1.31 4,710.54 1/312017 4:28:52PM Page 9 COMPASS 5000.1 Build 81B boAa BP WE Fag Vbp Final Survey Report BAKER MD Inc Azi (azimuth) HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Easting Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) (1) Site: PB DS 15 MD Reference: 15-166 @ 61.00usft (Nabors 7ES) (usft) Well: 15-16 North Reference: True 80.23 Wellbore: 15-16CPB1 Survey Calculation Method: Minimum Curvature 4,705.77 Design: 15-16CPB1 Database: EDM R5K - Alaska PROD - ANCP1 15-16CPB1 TIP to 15-16B Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (1) (1) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 13,281.94 80.23 351.08 8,669.88 8,608.88 6,372.10 4,705.77 5,967,110.953 680,643.063 1.60 4,705.77 15-16CPB1 TIP to 15-16B 13,288.00 80.31 350.92 8,670.90 8,609.90 6,378.00 4,704.84 5,967,116.829 680,641.991 2.92 4,704.84 15-16CPBI KOP 13,289.50 80.33 350.88 8,671.16 8,610.16 6,379.46 4,704.60 5,967,118.283 680,641.723 2.77 4,704.60 13,309.63 84.22 347.74 8,673.86 8,612.86 6,399.05 4,700.90 5,967,137.784 680,637.564 24.75 4,700.90 15-16CPBI Interpolated Azimuth 13,337.38 89.01 343.46 8,675.50 8,614.50 6,425.87 4,694.01 5,967,164.430 680,630.050 23.13 4,694.01 16-16CPB7 Interpolated Azimuth 13,367.45 89.97 338.86 8,675.77 8,614.77 6,454.32 4,684.30 5,967,192.643 680,619.679 15.63 4,684.30 13,397.57 89.72 333.17 8,675.85 8,614.85 6,481.83 4,672.07 5,967,219.854 680,606.800 18.91 4,672.07 13,427.65 88.80 326.95 8,676.24 8,615.24 6,507.88 4,657.06 5,967,245.544 680,591.191 20.90 4,657.06 13,457.43 88.31 319.87 8,676.99 8,615.99 6,531.77 4,639.33 5,967,269.009 680,572.903 23.82 4,639.33 13,487.83 87.33 314.24 8,678.15 8,617.15 6,553.99 4,618.64 5,967,290.745 680,551.702 18.78 4,618.64 13,517.43 85.75 307.19 8,679.94 8,618.94 6,573.25 4,596.26 5,967,309.475 680,528.880 24.37 4,596.26 13,547.71 85.61 300.46 8,682.22 8,621.22 6,590.05 4,571.19 5,967,325.680 680,503.426 22.17 4,571.19 13,577.65 84.99 293.34 8,684.68 8,623.68 6,603.54 4,544.60 5,967,338.545 680,476.526 23.79 4,544.60 13,607.66 85.64 286.28 8,687.13 8,626.13 6,613.67 4,516.48 5,967,348.011 680,448.176 23.55 4,516.48 13,635.82 85.39 280.36 8,689.34 8,628.34 6,620.14 4,489.17 5,967,353.835 680,420.728 20.98 4,489.17 13,666.20 85.17 276.49 8,691.84 8,630.84 6,624.57 4,459.23 5,967,357.567 680,390.690 12.72 4,459.23 13,694.94 85.11 273.77 8,694.27 8,633.27 6,627.13 4,430.71 5,967,359.458 680,362.120 9.43 4,430.71 13,725.24 86.13 270.61 8,696.59 8,635.59 6,628.29 4,400.52 5,967,359.904 680,331.918 10.93 4,400.52 13,754.79 85.02 267.91 8,698.87 8,637.87 6,627.91 4,371.07 5,967,358.834 680,302.481 9.85 4,371.07 13,785.10 84.25 265.26 8,701.70 8,640.70 6,626.11 4,340.95 5,967,356.332 680,272.413 9.07 4,340.95 13,815.80 85.21 261.32 8,704.52 8,643.52 6,622.54 4,310.59 5,967,352.050 680,242.152 13.16 4,310.59 13,845.18 87.51 258.19 8,706.39 8,645.39 6,617.32 4,281.74 5,967,346.161 680,213.437 13.20 4,281.74 13,874.88 89.17 254.69 8,707.25 8,646.25 6,610.36 4,252.89 5,967,338.528 680,184.755 13.04 4,252.89 13,905.72 89.08 251.72 8,707.72 8,646.72 6,601.46 4,223.37 5,967,328.930 680,155.456 9.63 4,223.37 1/3/2017 4:28:52PM Page 10 COMPASS 5000.1 Build 81B Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16CPB1 Design: 15-16CPB1 BP Final Survey Report Local Co-ordinate Reference: Well 15-16 TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) MD Reference: 15-16B @ 61.00usft (Nabors 7ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 rias BAKER HUGHES Survey Measured MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft (usft) 13,935.72 86.74 249.06 8,708.81 8,647.81 6,591.40 4,195.14 5,967,318.212 680,127.465 11.80 4,195.14 13,982.00 86.74 249.06 8,711.44 8,650.44 6,574.88 4,151.98 5,967,300.693 680,084.713 0.00 4,151.98 Projection to TD 6,399.05 4,700.90 15-16CPB1Interpolated Azimuth 13,337.38 8,675.50 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 13,281.94 8,669.88 6,372.10 4,705.77 15-16CPB1 TIP to 15-16B 13,288.00 8,670.90 6,378.00 4,704.84 15-16CPB1 KOP 13,309.63 8,673.86 6,399.05 4,700.90 15-16CPB1Interpolated Azimuth 13,337.38 8,675.50 6,425.87 4,694.01 15-16CPB1 Interpolated Azimuth 13,982.00 8,711.44 6,574.88 4,151.98 Projection to TD Prepared By: Yosha Ragbirsingh Survey Manager, Baker Hughes 1/312017 4:28:52PM Page 11 COMPASS 5000.1 Build 81B North America - ALASKA - BP Prudhoe Bay PB DS 15 15-16 15-16CPB2 500292111572 Design: 15-16CPB2 Final Survey Report 03 January, 2017 BAKER HUGHES b BP WGFAI Vwood p Final Survey Report Dip Angle Field Strength BAKER (°) (°) (nT) HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Version: Well: 15-16 North Reference: True Depth From (TVD) Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature (usft) Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 0.00 90.00 Project Prudhoe Bay, GPB, PRUDHOE BAY 1/3/2017 4.39:30PM Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27OGP-Usa AK [4267`15864] Using Well Reference Point Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734`1586, Using geodetic scale factor Site PB DS 15, TR-11-14 Site Position: Northing: 5,958,837.360 usft Latitude: 70° 17'35.236 N From: Map Easting: 676,296.980 usft Longitude: 148° 34'21.213 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.34 ° Well 15-16, 15-16 Well Position +N/ -S 0.00 usft Northing: 5,960,630.760 usft Latitude: 70° 17' 52.919 N +E/ -W 0.00 usft Easting: 676,088.190 usft Longitude: 148° 34'26.072 W Position Uncertainty 0.00 usft Wellhead Elevation: 36.02 usft Ground Level: 33.16 usft Wellbore 15-16CPB2 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2016 1/1/2017 18.14 81.02 57,558 Design 15-16C P B2 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 13,281.94 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (I 24.98 0.00 0.00 90.00 1/3/2017 4.39:30PM Page 2 COMPASS 5000.1 Build 81B �.! BP riFlu p Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 Azi (azimuth) North Reference: True Wellbore: 15-16CPB2 EM Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 V.Sec Database: EDM R5K - Alaska PROD - ANCP1 Survey Program Date 1/3/2017 (usft) (usft) (usft) From To (usft) (usft) (°1100usft) (usft) (usft) Survey (Wellbore) Tool Name Description 0.00 90.00 4,540.00 15-16 Srvy 2 GYD CT CMS (15-16) GYD-CT-CMS Gyrodata cont -casing m/s 0.00 4,587.00 4,604.00 15-1613PB1 Srvy 1 Blind (15-16BPB1) BLIND Blind drilling 0.00 4,626.54 4,720.47 15-16BPB1 Srvy 2 Inc+Trend (15-16BPB1 INC+TREND Inclinometer + known azi trend 90.00 4,813.93 12,335.13 15-16BPB1 Srvy 3 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 5,960,630.550 12,409.41 12,912.00 15-1661361 Srvy 4 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 190.00 12,938.02 13,281.94 15-16B Srvy 1 MWD+IFR+MS (15-16B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 129.00 13,289.50 15,611.15 15-16CPB2 CTK MWD 4-1/4" (15-16CPB2 MWD MWD - Standard 676,088.352 Survey -- MD Inc Azi (azimuth) TVD TVDSS NIS EM Northing Easting DLeg V.Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 24.98 0.00 0.00 24.98 -36.02 0.00 0.00 5,960,630.760 676,088.190 0.00 0.00 90.00 0.37 179.86 90.00 29.00 -0.21 0.00 5,960,630.550 676,088.195 0.57 0.00 190.00 0.43 158.08 190.00 129.00 -0.88 0.14 5,960,629.883 676,088.352 0.16 0.14 290.00 0.36 180.27 289.99 428.99 pY -1.54 0.28 5,960,629.224 676,088.506 0.17 0.28 390.00 390.00 0.51 168.24 389.99.- 328.99 -21 0.37 5,960,628.476 676,088.613 0.17 0.37 490.00 0.43 179.07 489.9 428.99 31 0.47 5,960,627.668 676,088.729 0.12 0.47 590.00 0.49 164.12 589.99 528.99 -3.89 0.59 5,960,626.885 676,088.870 0.13 0.59 690.00 0.41 178.64 689.98 628.98 -4.66 0.71 5,960,626.119 676,089.014 0.14 0.71 790.00 0.12 121.30 789.98 728.98 -5.07 0.81 5,960,625.709 676,089.121 0.36 0.81 890.00 0.37 81.65 889.98 828.98 -5.08 1.22 5,960,625.711 676,089.530 0.29 1.22 990.00 0.43 85.77 989.98 928.98 -5.00 1.92 5,960,625.802 676,090.222 0.07 1.92 1,090.00 0.32 93.93 1,089.98 1,028.98 -5.00 2.57 5,960,625.826 676,090.874 0.12 2.57 1,190.00 0.30 72.48 1,189.97 1,128.97 -4.94 3.10 5, 960, 625.898 676, 091.401 0.12 3.10 1,290.00 0.40 81.01 1,289.97 1,228.97 -4.80 3.69 5,960,626.045 676,091.992 0.11 3.69 1,390.00 0.40 115.46 1,389.97 1,328.97 -4.90 4.35 5,960,625.965 676,092.654 0.24 4.35 1,490.00 0.31 96.64 1,489.97 1,428.97 -5.08 4.93 5,960,625.797 676,093.242 0.15 4.93 1,590.00 0.46 131.91 1,589.97 1,528.97 -5.38 5.50 5,960,625.511 676,093.816 0.27 5.50 1,690.00 0.41 126.75 1,689.96 1,628.96 -5.86 6.09 5,960,625.043 676,094.413 0.06 6.09 1/3/2017 4:39:30PM Page 3 COMPASS 5000.1 Build 81B hood b p BP rel .2 Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (1 (1) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 1,790.00 0.28 164.95 1,789.96 1,728.96 -6.31 6.44 5,960,624.601 676,094.773 0.26 6.441 1,890.00 0.34 163.56 1,889.96 1,828.96 -6.83 6.58 5,960,624.085 676,094.933 0.06 6.58 1,990.00 0.53 67.10 1,989.96 1,928.96 -6.94 7.09 5,960,623.992 676,095.445 0.66 7.09 2,090.00 0.64 69.28 2,089.95 2,028.95 -6.56 8.04 5,960,624.392 676,096.384 0.11 8.04 2,190.00 0.60 82.25 2,189.95 2,128.95 -6.29 9.08 5,960,624.684 676,097.419 0.15 9.08 2,290.00 0.86 153.02 2,289.94 2,228.94 -6.89 9.94 5,960,624.106 676,098.292 0.87 9.94 2,390.00 0.96 160.89 2,389.93 2,328.93 -8.35 10.56 5,960,622.661 676,098.941 0.16 10.56 2,485.00 0.89 153.98 2,484.92 2,423.92 -9.77 11.14 5,960,621.258 676,099.559 0.14 11.14 13 3/8" 2,490.00 0.89 153.59 2,489.92 2,428.92 -9.84 11.18 5,960,621.189 676,099.595 0.14 11.18 2,590.00 1.43 24.44 2,589.90 2,528.90 -9.40 12.04 5,960,621.649 676,100.446 2.11 12.04 2,690.00 4.99 19.36 2,689.73 2,628.73 -4.16 14.00 5,960,626.934 676,102.281 3.57 14.00 2,790.00 6.55 12.61 2,789.22 2,728.22 5.51 16.69 5,960,636.664 676,104.741 1.70 16.69 2,890.00 8.25 7.65 2,888.39 2,827.39 � y, � 18.19 18.89 5,960,649.389 676,106.644 1.81 18.89 2,990.00 9.99 13.86 2,987.12 2,926.12 33.73 21.92 5,960,664.988 676,109.312 2.00 21.92 3,090.00 11.39 28.91 `3,085.40 3,024.40 50.80 28.77 5,960,682.212 676,115.763 3.11 28.77 3,190.00 12.85 35.21 3,183.18 3,122.18 68.53 39.96 5,960,700.199 676,126.530 1.97 39.96 3,290.00 13.38 25.23 3,280.58 3,219.58 88.08 51.30 5,960,720.013 676,137.412 2.32 51.30 3,340.00 14.04 24.08 3,329.16 3,268.16 98.85 56.24 5,960,730.896 676,142.099 1.43 56.24 3,390.00 14.79 23.96 3,377.58 3,316.58 110.22 61.31 5,960,742.380 676,146.897 1.50 61.31 3,440.00 15.54 24.87 3,425.84 3,364.84 122.13 66.72 5,960,754.412 676,152.025 1.57 66.72 3,490.00 16.40 26.22 3,473.91 3,412.91 134.54 72.65 5,960,766.956 676,157.668 1.87 72.65 3,540.00 17.20 27.38 3,521.78 3,460.78 147.44 79.17 5,960,780.001 676,163.882 1.73 79.17 3,590.00 18.81 29.52 3,569.33 3,508.33 161.02 86.55 5,960,793.749 676,170.933 3.48 86.55 3,640.00 20.34 30.37 3,616.43 3,555.43 175.53 94.91 5,960,808.453 676,178.956 3.11 94.91 3,690.00 21.45 31.12 3,663.15 3,602.15 190.85 104.03 5,960,823.986 676,187.713 2.28 104.03 3,740.00 22.83 31.56 3,709.46 3,648.46 206.95 113.83 5,960,840.302 676,197.135 2.78 113.83 1/3/2017 4:39:30PM Page 4 COMPASS 5000.1 Build 81B Vpb BP r/.A2 Final Survey Report BAKER HUGHES Company: Project: Site: Well: Wellbore: Design: Survey North America - ALASKA - BP Prudhoe Bay PB DS 15 15-16 15-16C P B2 15-16CPB2 MD (usft) 3,790.00 3,840.00 3,890.00 3,940.00 3,990.00 4,040.00 4,090.00 4,140.00 4,190.00 4,240.00 4,290.00 4,340.00 4,390.00 4,440.00 4,490.00 4,540.00 4,587.00 95/8'. 4,604.00 4,626.54 4,720.47 4,813.93 4,906.86 5,003.33 5,096.00 5,193.19 5,286.33 Inc (I ►zNY, 25.64 27.86 29.43 31.04 32.33 33.53 34.98 36.31 38.51 40.39 42.01 43.50 44.46 45.45 47.24 49.09 Local Co-ordinate Reference: Well 15-16 TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) MD Reference: 15-16B @ 61.00usft (Nabors 7ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Azi (azimuth) 37.00 TVD TVDSS N/S 631.30 E/W Northing Easting 11.95 DLeg V. Sec 38.00 (°) (usft) (usft) 400.63 (usft) 5,961,284.840 (usft) (usft) 4.53 (usft) (°/100usft) (usft) 4,474.18 31.76 4,413.18 3,755.32 3,694.32 223.90 124.29 5,960,857.494 448.10 676,207.189 56.37 2.58 124.29 4,529.02 31.75 752.16 3,800.68 3,739.68 5,961,394.434 241.78 676,572.886 135.36 5,960,875.634 676,217.837 44.78 3.04 135.36 4,517.25 31.39 559.53 3,845.32 3,784.32 260.96 4.62 147.14 5,960,895.078 62.85 676,229.162 4.45 147.14 4,563.66 864.78 31.59 3,889.20 3,828.20 676,688.516 281.40 620.80 159.66 5,960,915.802 41.60 676,241.200 4,665.11 3.15 159.66 923.91 679.49 31.61 5,961,570.279 3,932.40 3,871.40 6.84 302.84 172.85 5,960,937.547 676,253.885 3.22 172.85 738.32 31.79 3,974.95 3,913.95 738.32 325.18 66.86 186.65 5,960,960.207 4,742.26 676,267.158 4,681.26 2.59 186.65 5,961,702.967 32.30 676,858.329 4,016.91 3,955.91 348.22 201.07 5,960,983.574 676,281.036 2.46 201.07 32.84 4,058.24 3,997.24 371.94 216.23 5,961,007.637 676,295.627 2.96 216.23 33.17 4,098.87 4,037.87 396.37 232.10 5,961,032.435 676,310.922 2.69 232.10 33.62 4,138.58 4,077.58 421.73 248.82 5,961,058.175 676,327.043 4.43 248.82 33.70 4,177.19 4,116.19 448.17 266.43 5,961,085.021 676,344.026 3.76 266.43 33.81 4,214.81 4,153.81 475.55 284.73 5,961,112.822 676,361.678 3.24 284.73 33.74 gnewm4,251.52 4,190.52 503.77 303.60 5,961,141.468 676,379.880 2.98 303.60 33.81 4,287.50 4,226.50 532.63 322.90 5,961,170.771 676,398.499 1.92 322.90 33.90 4,322.88 4,261.88 561.96 342.58 5,961,200.559 676,417.486 1.98 342.58 34.25`4,357. 4,296.40 591.93 362.85 5,961,230.986 676,437.045 3.62 362.85 1 34.55 4,388.74 4,327.74 620.82 382.63 5,961,260.332 676,456.146 3.96 382.63 49.90 37.00 4,399.79 4,338.79 631.30 390.19 5,961,270.990 676,463.455 11.95 390.19 49.22 38.00 4,414.41 4,353.41 644.91 400.63 5,961,284.840 676,473.575 4.53 400.63 51.78 43.80 4,474.18 4,413.18 699.60 448.10 5,961,340.626 676,519.742 5.49 448.10 56.37 48.05 4,529.02 4,468.02 752.16 502.49 5,961,394.434 676,572.886 6.14 502.49 59.65 44.78 4,578.25 4,517.25 806.51 559.53 5,961,450.102 676,628.638 4.62 559.53 62.85 48.04 4,624.66 4,563.66 864.78 620.80 5,961,509.787 676,688.516 4.45 620.80 65.42 41.60 4,665.11 4,604.11 923.91 679.49 5,961,570.279 676,745.804 6.84 679.49 66.05 41.60 4,705.05 4,644.05 990.17 738.32 5,961,637.892 676,803.058 0.65 738.32 66.86 41.77 4,742.26 4,681.26 1,053.94 795.10 5,961,702.967 676,858.329 0.89 795.10 1/3/2017 4:39:30PM Page 5 COMPASS 5000.1 Build 81B BP EPA .I Vbp Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-166 @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 5,378.55 66.00 40.77 4,779.14 4,718.14 1,117.46 850.86 5,961,767.779 676,912.576 1.36 850.86 5,472.62 64.46 39.04 4,818.55 4,757.55 1,182.98 905.65 5,961,834.553 676,965.820 2.34 905.65 5,570.80 65.40 38.90 4,860.15 4,799.15 1,252.12 961.58 5,961,904.981 677,020.109 0.97 961.58 5,666.46 63.33 38.54 4,901.54 4,840.54 1,319.40 1,015.53 5,961,973.506 677,072.460 2.19 1,015.53 5,757.98 63.20 38.03 4,942.71 4,881.71 1,383.56 1,066.17 5,962,038.828 677,121.581 0.52 1,066.17 5,852.93 63.06 39.82 4,985.63 4,924.63 1,449.45 1,119.38 5,962,105.942 677,173.232 1.69 1,119.38 5,947.04 63.90 43.51 5,027.66 4,966.66 1,512.33 1,175.36 5,962,170.116 677,227.712 3.62 1,175.36 6,041.27 64.55 44.66 5,068.63 5,007.63 1,573.28 1,234.39 5,962,232.428 677,285.300 1.30 1,234.39 6,136.26 64.38 47.07 5,109.59 5,048.59 1,632.96 1,295.90 5,962,293.529 677,345.389 2.30 1,295.90 6,230.93 65.05 46.45 5,150.02 5,089.02 1,691.60 1,358.26 5,962,353.611 677,406.351 0.92 1,358.26 6,259.71 65.49 46.48 5,162.06 5,101.06 1,709.61 1,377.21 5,962,372.054 677,424.873 1.53 1,377.21 6,318.80 67.15 45.22 5,185.79 5,124.79 1,747.30 1,416.03 5,962,410.645 677,462.800 3.42 1,416.03 6,368.92 63.86 46.23 5,206.57 5,145.57 1,779.14 1,448.68 5,962,443.237 677,494.691 6.82 1,448.68 6,410.76 61.23 46.69 5,225.86 5,164.868 ` 1,804.71 1,475.59 5,962,469.434 677,520.992 6.36 1,475.59 6,504.67 61.20 47.28 5,271.08 5,210.08 1,860.86 1,535.77 5,962,526.973 677,579.836 0.55 1,535.77 6,596.18 61.28 48.08 5,315.T1 5,254.11 1,914.87 1,595.08 5,962,582.354 677,637.865 0.77 1595.08 6,699.05 61.46 47.28 5,364.40 5,303.40 1,975.66 1,661.84 5,962,644.689 677,703.179 0.70 1,661.84 6,796.68 61.11 47.94 5,411.31 5,350.31 2,033.39 1,725.08 5,962,703.876 677,765.043 0.69 1,725.08 6,886.49 61.53 47.54 5,454.41 5,393.41 2,086.37 1,783.39 5,962,758.211 677,822.094 0.61 1,783.39 6,980.91 60.83 46.42 5,499.93 5,438.93 2,142.81 1,843.88 5,962,816.045 677,881.233 1.28 1,843.88 7,075.82 62.24 46.48 5,545.16 5,484.16 2,200.29 1,904.35 5,962,874.927 677,940.337 1.49 1,904.35 7,170.28 61.35 44.92 5,589.81 5,528.81 2,258.43 1,963.92 5,962,934.436 677,998.532 1.73 1,963.92 7,264.26 61.13 43.53 5,635.03 5,574.03 2,317.46 2,021.39 5,962,994.798 678,054.591 1.32 2,021.39 7,357.92 64.10 44.99 5,678.10 5,617.10 2,377.00 2,079.43 5,963,055.680 678,111.219 3.46 2,079.43 7,453.73 66.20 45.16 5,718.37 5,657.37 2,438.40 2,140.98 5,963,118.491 678,171.312 2.20 2,140.98 7,548.68 66.40 45.16 5,756.53 5,695.53 2,499.70 2,202.63 5,963,181.220 678,231.504 0.21 2,202.63 7,643.91 66.66 45.51 5,794.46 5,733.46 2,561.10 2,264.76 5,963,244.059 678,292.171 0.43 2,264.76 1/3/2017 4:39:30PM Page 6 COMPASS 5000.1 Build 81B ftood Vbp BP Final Survey Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey rias BAKER HUGHES MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft)usft ( ) (°/100usft) (usft) 7,734.70 66.23 45.30 5,830.74 5,769.74 2,619.54 2,324.02 5,963,303.859 678,350.045 0.52 2,324.02 7,829.73 66.95 45.54 5,868.50 5,807.50 2,680.75 2,386.14 5,963,366.505 678,410.706 0.79 2,386.14 7,924.91 66.18 45.79 5,906.35 5,845.35 2,741.78 2,448.60 5,963,428.977 678,471.717 0.84 2,448.60 8,022.53 66.32 45.30 5,945.67 5,884.67 2,804.35 2,512.38 5,963,493.028 678,534.009 0.48 2,512.38 8,116.99 65.94 44.40 5,983.89 5,922.89 2,865.59 2,573.30 5,963,555.673 678,593.473 0.96 2,573.30 8,210.59 65.92 43.97 6,022.07 5,961.07 2,926.88 2,632.86 5,963,618.331 678,651.581 0.42 2,632.86 8,303.68 66.06 43.13 6,059.94 5,998.94 2,988.51 2,691.45 5,963,681.314 678,708.705 0.84 2,691.45 8,397.95 65.51 42.44 6,098.61 6,037.61 3,051.60 2,749.85 5,963,745.758 678,765.605 0.89 2,749.85 8,490.59 65.38 41.74 6,137.11 6,076.11 3,114.13 2,806.33 5,963,809.589 678,820.601 0.70 2,806.33 8,584.52 65.53 39.71 6,176.13 6,115.13 3,178.88 2,862.07 5,963,875.621 678,874.806 1.97 2,862.07 8,678.96 65.55 38.62 6,215.24 6,154.24 3,245.53 2,916.36 5,963,943.520 678,927.516 1.05 2,916.36 8,776.77 65.64 38.11 6,255.65 6,194.65 3,315.37 2,971.64 5,964,014.629 678,981.143 0.48 2,971.64 8,872.08 65.77 39.26 6,294.87 6,233.87 3,383.18 3,025.94 5,964,083.686 679,033.832 1.11 3,025.94 8,966.07 65.72 40.92 6,333.48 6,272.48 'iS '; a? 3,448.73 3,081.12 5,964,150.512 679,087.460 1.61 3,081.12 9,059.53 65.45 41.68 6,372.11 6,311.11 3,512.67 3,137.29 5,964,215.740 679,142.110 0.79 3,137.29 9,153.43 65.49 41.05 6,411.09 6,350.09 3,576.78 3,193.74 5,964,281.154 679,197.041 0.61 3,193.74 9,247.90 65.39 40.28 6,450.36 6,389.36 3,641.95 3,249.73 5,964,347.618 679,251.485 0.75 3,249.73 9,343.13 65.39 39.26 6,490.02 6,429.02 3,708.50 3,305.11 5,964,415.439 679,305.292 0.97 3,305.11 9,436.42 65.42 39.65 6,528.85 6,467.85 3,773.99 3,359.02 5,964,482.175 679,357.643 0.38 3,359.02 9,531.09 65.49 39.44 6,568.17 6,507.17 3,840.40 3,413.85 5,964,549.843 679,410.897 0.21 3,413.85 9,624.40 65.35 38.85 6,606.99 6,545.99 3,906.21 3,467.41 5,964,616.884 679,462.904 0.59 3,467.41 9,718.66 65.40 38.86 6,646.26 6,585.26 3,972.94 3,521.17 5,964,684.849 679,515.079 0.05 3,521.17 9,812.95 65.32 38.39 6,685.57 6,624.57 4,039.89 3,574.67 5,964,753.036 679,566.990 0.46 3,574.67 9,908.17 65.45 39.06 6,725.24 6,664.24 4,107.43 3,628.82 5,964,821.817 679,619.544 0.65 3,628.82 10,002.84 65.73 39.81 6,764.36 6,703.36 4,174.01 3,683.58 5,964,889.658 679,672.725 0.78 3,683.58 10,097.24 66.79 41.45 6,802.37 6,741.37 4,239.58 3,739.85 5,964,956.528 679,727.439 1.95 3,739.85 10,193.30 66.02 43.10 6,840.82 6,779.82 4,304.72 3,799.06 5,965,023.027 679,785.103 1.77 3,799.06 1/3/2017 4:39:30PM Page 7 COMPASS 5000.1 Build 81B VbpBPrfA.9 Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61,00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K-Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 10,286.68 65.22 45.46 6,879.37 6,818.37 4,365.61 3,858.43 5,965,085.288 679,843.027 2.46 3,858.43 10,381.40 65.65 45.37 6,918.75 6,857.75 4,426.08 3,919.79 5,965,147.177 679,902.944 0.46 3,919.79 10,476.11 65.93 45.43 6,957.58 6,896.58 4,486.73 3,981.29 5,965,209.250 679,963.007 0.30 3,981.29 10,569.67 65.90 45.52 6,995.77 6,934.77 4,546.62 4,042.19 5,965,270.551 680,022.479 0.09 4,042.19 10,664.13 65.90 45.38 7,034.34 6,973.34 4,607.11 4,103.64 5,965,332.460 680,082.489 0.14 4,103.64 10,757.63 63.84 44.46 7,074.04 7,013.04 4,667.05 4,163.41 5,965,393.772 680,140.837 2.38 4,163.41 10,853.14 60.04 43.42 7,118.96 7,057.96 4,727.71 4,221.89 5,965,455.790 680,197.878 4.09 4,221.89 10,947.88 57.26 40.47 7,168.25 7,107.25 4,787.86 4,275.98 5,965,517.179 680,250.540 3.96 4,275.98 11,039.80 53.73 39.27 7,220.32 7,159.32 4,845.97 4,324.54 5,965,576.413 680,297.724 3.99 4,324.54 11,135.27 51.98 36.23 7,277.97 7,216.97 4,906.11 4,371.14 5,965,637.627 680,342.896 3.13 4,371.14 11,228.64 51.31 33.78 7,335.92 7,274.92 4,966.08 4,413.14 5,965,698.552 680,383.479 2.18 4,413.14 11,323.20 50.84 31.00 7,395.34 7,334.34 5,028.18 4,452.55 5,965,761.559 680,421.415 2.34 4,452.55 11,417.12 49.15 29.95 7,455.71 7,394.71 5,090.18 4,489.04 5,965,824.388 680,456.441 1.99 4,489.04 11,512.52 46.22 28.86 7,519.93 7,458.93 5,151.62 4,523.68 5,965,886.619 680,489.635 3.19 4,523.68 11,607.94 43.19 28.33 7,587.74 7,526.74 5,210.54 4,555.81 5,965,946.277 680,520.373 3.20 4,555.81 11,700.55 40.75 26.16 7,656.59 7,595.59 5,265.58 4,584.18 5,966,001.960 680,547.445 3.07 4,584.18 11,795.50 37.26 20.32 7,730.39 7,669.39 5,320.38 4,607.84 5,966,057.301 680,569.812 5.33 4,607.84 11,890.04 33.52 15.98 7,807.46 7,746.46 5,372.34 4,624.98 5,966,109.645 680,585.723 4.76 4,624.98 11,984.92 34.83 15.02 7,885.96 7,824.96 5,423.70 4,639.21 5,966,161.318 680,598.749 1.49 4,639.21 12,079.57 34.93 14.55 7,963.61 7,902.61 5,476.04 4,653.02 5,966,213.958 680,611.331 0.30 4,653.02 12,173.85 35.46 17.28 8,040.66 7,979.66 5,528.28 4,667.93 5,966,266.532 680,625.007 1.76 4,667.93 12,268.00 34.76 18.75 8,117.68 8,056.68 5,579.77 4,684.67 5,966,318.401 680,640.535 1.17 4,684.67 12,335.13 34.68 17.99 8,172.85 8,111.85 5,616.06 4,696.72 5,966,354.956 680,651.730 0.66 4,696.72 12,398.00 34.74 17.59 8,224.54 8,163.54 5,650.14 4,707.66 5,966,389.288 680,661.866 0.37 4,707.66 7" 12,409.41 34.75 17.52 8,233.91 8,172.91 5,656.34 4,709.62 5,966,395.532 680,663.682 0.37 4,709.62 12,439.21 34.56 17.51 8,258.42 8,197.42 5,672.50 4,714.72 5,966,411.806 680,668.401 0.64 4,714.72 1/3/2017 4:39:30PM Page 8 COMPASS 5000.1 Build 81B Vpb BP F/.as Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 12,470.89 37.18 15.35 8,284.09 8,223.09 5,690.31 4,719.96 5,966,429.726 680,673.221 9.18 4,719.96 12,503.45 40.47 13.47 8,309.46 8,248.46 5,710.08 4,725.02 5,966,449.608 680,677.823 10.73 4,725.02 12,534.30 39.83 12.73 8,333.04 8,272.04 5,729.45 4,729.53 5,966,469.080 680,681.877 2.59 4,729.53 12,567.14 41.78 8.81 8,357.90 8,296.90 5,750.53 4,733.53 5,966,490.242 680,685.376 9.80 4,733.53 12,598.01 45.60 7.12 8,380.22 8,319.22 5,771.64 4,736.47 5,966,511.418 680,687.823 12.94 4,736.47 12,629.48 45.23 7.03 8,402.31 8,341.31 5,793.88 4,739.23 5,966,533.718 680,690.062 1.19 4,739.23 12,661.36 47.37 4.19 8,424.34 8,363.34 5,816.82 4,741.47 5,966,556.695 680,691.766 9.30 4,741.47 12,692.54 51.10 1.51 8,444.69 8,383.69 5,840.39 4,742.63 5,966,580.293 680,692.372 13.62 4,742.63 12,723.54 50.73 1.56 8,464.24 8,403.24 5,864.45 4,743.28 5,966,604.354 680,692.452 1.20 4,743.28 12,755.41 50.67 1 34 8,484.42 8,423.42 5,889.10 4,743.90 5,966,629.015 680,692.499 0.57 4,743.90 12,787.08 53.01 1.18 8,503.99 8,442.99 5,914.00 4,744.45 5,966,653.913 680,692.462 7.40 4,744.45 12,818.21 58.28 0.83 8,521.55 8,460.55 5,939.68 4,744.90 5,966,679.601 680,692.308 16.95 4,744.90 12,850.06 59.27 1.28 8,538.06 8,477.06 5,966.91 4,745.40 5,966,706.835 680,692.172 3.33 4,745.40 12,881.58 62.72 359.99 8,553.34 8,492.34 5,994.47 4,745.70 5,966,734.393 680,691.827 11.52 4,745.70 12,912.00 66.73 yr 359.42 T 8,566.33 8,505.33 6,021.98 4,745.55 5,966,761.882 680,691.038 13.29 4,745.55 4 112" 12,938.02 66.96 0.31 8,576.56 8,515.56 6,045.90 4,745.50 5,966,785.796 680,690.422 3.27 4,745.50 12,969.25 62.70 358.81 8,589.84 8,528.84 6,074.16 4,745.29 5,966,814.038 680,689.549 14.32 4,745.29 13,000.02 65.52 355.30 8,603.28 8,542.28 6,101.79 4,743.86 5,966,841.631 680,687.470 13.76 4,743.86 13,032.34 68.81 354.07 8,615.82 8,554.82 6,131.45 4,741.09 5,966,871.210 680,684.014 10.77 4,741.09 13,062.36 72.07 353.91 8,625.87 8,564.87 6,159.57 4,738.13 5,966,899.259 680,680.394 10.87 4,738.13 13,092.77 75.99 351.48 8,634.24 8,573.24 6,188.56 4,734.41 5,966,928.152 680,675.994 15.01 4,734.41 13,124.60 78.73 351.17 8,641.20 8,580.20 6,219.26 4,729.72 5,966,958.732 680,670.591 8.66 4,729.72 13,156.96 79.16 351.10 8,647.40 8,586.40 6,250.64 4,724.83 5,966,989.987 680,664.963 1.35 4,724.83 13,187.96 79.46 351.23 8,653.16 8,592.16 6,280.74 4,720.15 5,967,019.967 680,659.581 1.05 4,720.15 13,219.79 79.60 351.18 8,658.94 8,597.94 6,311.68 4,715.37 5,967,050.777 680,654.072 0.47 4,715.37 13,251.13 79.81 350.82 8,664.54 8,603.54 6,342.13 4,710.54 5,967,081.109 680,648.536 1.31 4,710.54 1/312017 4:39:30PM Page 9 COMPASS 5000.1 Build 81B Vpb BP FSFA9 Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 13,281.94 80.23 351.08 8,669.88 8,608.88 6,372.10 4,705.77 5,967,110.953 680,643.063 1.60 4,705.77 13,289.50 80.33 350.88 8,671.16 8,610.16 6,379.46 4,704.60 5,967,118.283 680,641.723 2.89 4,704.60 13,309.63 84.22 347.74 8,673.86 8,612.86 6,399.05 4,700.90 5,967,137.784 680,637.564 24.75 4,700.90 13,337.38 89.01 343.46 8,675.50 8,614.50 6,425.87 4,694.01 5,967,164.430 680,630.050 23.13 4,694.01 13,367.45 89.97 338.86 8,675.77 8,614.77 6,454.32 4,684.31 5,967,192.643 680,619.680 15.63 4,684.31 13,397.57 89.72 333.17 8,675.85 8,614.85 6,481.83 4,672.07 5,967,219.854 680,606.801 18.91 4,672.07 13,427.65 88.80 326.95 8,676.24 8,615.24 6,507.88 4,657.06 5,967,245.544 680,591.192 20.90 4,657.06 13,457.43 88.31 319.87 8,676.99 8,615.99 6,531.77 4,639.33 5,967,269.009 680,572.904 23.82 4,639.33 13,487.83 87.33 314.24 8,678.15 8,617.15 6,553.99 4,618.64 5,967,290.745 680,551.702 18.78 4,618.64 13,517.43 85.75 307.19 8,679.94 8,618.94 6,573.25 4,596.26 5,967,309.475 680,528.880 24.37 4,596.26 13,547.71 85.61 300.46 8,682.22 8,621.22 6,590.05 4,571.19 5,967,325.680 680,503.426 22.17 4,571.19 13,577.65 84.99 293.34 8,684.68 8,623.68 6,603.54 4,544.60 5,967,338.545 680,476.526 23.79 4,544.60 13,607.66 85.64 286.28 rMN5.79 8,687.13 8,626.13 6,613.67 4,516.48 5,967,348.011 680,448.177 23.55 4,516.48 13,610.00 85.62 8,687.31 8,626.31 6,614.32 4,514.24 5,967,348.603 680,445.920 20.99 4,514.24 15-16CPB2 TIP to 15-16CPB1 13,635.27 89.51 286.85 "'8,688.38 8,627.38 6,621.41 4,490.01 5,967,355.126 680,421.537 15.97 4,490.01 16-16CPB2 KOP- Billet 13,665.51 91.41 284.39 8,688.14 8,627.14 6,629.55 4,460.89 5,967,362.582 680,392.237 10.28 4,460.89 13,696.02 90.31 281.37 8,687.68 8,626.68 6,636.35 4,431.16 5,967,368.682 680,362.353 10.53 4,431.16 13,725.56 89.88 277.50 8,687.63 8,626.63 6,641.19 4,402.02 5,967,372.840 680,333.115 13.18 4,402.02 13,755.42 90.03 273.98 8,687.66 8,626.66 6,644.18 4,372.32 5,967,375.128 680,303.349 11.80 4,372.32 13,785.50 89.91 270.63 8,687.67 8,626.67 6,645.39 4,342.27 5,967,375.634 680,273.280 11.14 4,342.27 13,815.66 89.82 266.71 8,687.74 8,626.74 6,644.69 4,312.12 5,967,374.228 680,243.160 13.00 4,312.12 13,845.44 90.15 263.03 8,687.75 8,626.75 6,642.03 4,282.46 5,967,370.871 680,213.577 12.41 4,282.46 13,875.71 88.68 258.37 8,688.06 8,627.06 6,637.14 4,252.60 5,967,365.283 680,183.840 16.14 4,252.60 13,905.42 89.36 253.77 8,688.57 8,627.57 6,629.99 4,223.78 5,967,357.461 680,155.194 15.65 4,223.78 13,935.63 90.98 250.90 8,688.48 8,627.48 6,620.82 4,195.00 5,967,347.624 680,126.637 10.91 4,195.00 1/3/2017 4:39:30PM Page 10 COMPASS 5000.1 Build 81B boodIF b BP riFAI pFinal Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CP82 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey - -- - MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 13,965.58 89.85 247.08 8,688.26 8,627.26 6,610.09 4,167.04 5,967,336.237 680,098.945 13.30 4,167.04 13,995.54 89.14 241.90 8,688.53 8,627.53 6,597.19 4,140.02 5,967,322.710 680,072.228 17.45 4,140.02 14,025.43 90.34 238.91 8,688.66 8,627.66 6,582.43 4,114.03 5,967,307.347 680,046.596 10.78 4,114.03 14,057.01 92.80 238.35 8,687.80 8,626.80 6,566.00 4,087.08 5,967,290.289 680,020.038 7.99 4,087.08 14,085.50 92.92 242.26 8,686.38 8,625.38 6,551.90 4,062.37 5,967,275.622 679,995.664 13.71 4,062.37 14,114.17 92.27 245.99 8,685.08 8,624.08 6,539.41 4,036.60 5,967,262.526 679,970.201 13.19 4,036.60 14,146.26 92.67 252.00 8,683.69 8,622.69 6,527.92 4,006.68 5,967,250.342 679,940.564 18.75 4,006.68 14,180.68 89.97 255.77 8,682.90 8,621.90 6,518.37 3,973.63 5,967,240.023 679,907.749 13.47 3,973.63 14,210.74 90.55 257.60 8,682.76 8,621.76 6,511.45 3,944.38 5,967,232.417 679,878.671 6.39 3,944.38 14,240.61 89.94 262.09 8,682.64 8,621.64 6,506.18 3,914.99 5,967,226.465 679,849.411 15.17 3,914.99 14,275.63 88.96 266.57 8,682.97 8,621.97 6,502.73 3,880.15 5,967,222.191 679,814.666 13.09 3,880.15 14,305.96 89.05 271.22 8,683.50 8,622.50 6,502.14 3,849.84 5,967,220.897 679,784.378 15.33 3,849.84 14,335.85 88.99 275.71 8,684.01 8,623.01 6,503.95 3,820.02 5,967,222.003 679,754.523 15.02 3,820.02 14,365.93 87.85 280.44 8,684.84 8,623.84 6,508.17 ,tt° 3,790.26 5,967,225.526 679,724.672 16.17 3,790.26 14,395.89 86.22 284.95 8,686.39 8,625.39 6,514.74 3,761.08 5,967,231.413 679,695.348 15.99 3,761.08 14,426.00 85.42 289.68 8,688.59 8,627.59 ' 6,523.68 3,732.42 5,967,239.673 679,666.488 15.89 3,732.42 14,455.62 84.50 294.21 8,691.19 8,630.19 6,534.70 3,705.05 5,967,250.051 679,638.878 15.55 3,705.05 14,485.47 85.64 295.86 8,693.76 8,632.76 6,547.28 3,678.11 5,967,262.000 679,611.649 6.70 3,678.11 14,515.70 85.60 292.31 8,696.06 8,635.06 6,559.58 3,650.60 5,967,273.650 679,583.857 11.71 3,650.60 14,551.09 84.94 288.79 8,698.98 8,637.98 6,571.96 3,617.58 5,967,285.251 679,550.558 10.09 3,617.58 14,575.38 84.13 286.41 8,701.30 8,640.30 6,579.27 3,594.53 5,967,292.019 679,527.349 10.31 3,594.53 14,630.54 85.72 281.55 8,706.18 8,645.18 6,592.54 3,541.23 5,967,304.032 679,473.757 9.24 3,541.23 14,660.98 85.94 278.04 8,708.39 8,647.39 6,597.70 3,511.32 5,967,308.493 679,443.734 11.52 3,511.32 14,690.35 84.62 276.44 8,710.81 8,649.81 6,601.39 3,482.29 5,967,311.501 679,414.622 7.05 3,482.29 14,720.40 86.59 273.49 8,713.11 8,652.11 6,603.98 3,452.44 5,967,313.392 679,384.727 11.78 3,452.44 14,749.66 87.39 269.54 8,714.65 8,653.65 6,604.75 3,423.24 5,967,313.480 679,355.516 13.76 3,423.24 14,780.91 89.17 265.79 8,715.59 8,654.59 6,603.48 3,392.03 5,967,311.476 679,324.353 13.28 3,392.03 1/3/2017 4:39:30PM Page 11 COMPASS 5000.1 Build 81B bood Vpb BP rew.2 Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 14,811.78 89.08 261.78 8,716.06 8,655.06 6,600.14 3,361.36 5,967,307.418 679,293.763 12.99 3,361.36 14,840.88 91.72 261.11 8,715.86 8,654.86 6,595.81 3,332.58 5,967,302.417 679,265.101 9.36 3,332.58 14,877.98 90.92 257.70 8,715.00 8,654.00 6,588.99 3,296.13 5,967,294.746 679,228.821 9.44 3,296.13 14,901.18 90.15 254.13 8,714.79 8,653.79 6,583.35 3,273.63 5,967,288.576 679,206.463 15.74 3,273.63 14,931.75 90.49 249.62 8,714.62 8,653.62 6,573.84 3,244.59 5,967,278.391 679,177.651 14.79 3,244.59 14,960.64 90.61 247.27 8,714.34 8,653.34 6,563.23 3,217.72 5,967,267.153 679,151.042 8.14 3,217.72 14,991.38 89.97 250.69 8,714.18 8,653.18 6,552.20 3,189.03 5,967,255.460 679,122.621 11.32 3,189.03 15,027.88 88.56 256.20 8,714.65 8,653.65 6,541.81 3,154.06 5,967,244.249 679,087.906 15.58 3,154.06 15,055.91 86.37 256.65 8,715.89 8,654.89 6,535.24 3,126.84 5,967,237.041 679,060.851 7.98 3,126.84 15,080.69 87.67 260.80 8,717.18 8,656.18 6,530.40 3,102.58 5,967,231.637 679,036.710 17.53 3,102.58 15,129.29 87.29 269.60 8,719.32 8,658.32 6,526.34 3,054.25 5,967,226.447 678,988.486 18.11 3,054.25 15,167.14 86.93 275.35 8,721.23 8,660.23 6,527.97 3,016.50 5,967,227.193 678,950.710 15.20 3,016.50 15,191.03 87.02 279.05 8,722.49 8,661.49 6,530.96 2,992.83 5,967,229.627 678,926.984 15.47 2,992.83 15,240.05 88.28 287.32 8,724.51 8,663.51 6,542.12 2,945.19 5,967,239.671 678,879.094 17.05 2,945.19 15,271.13 88.52 293.11 8,725.37 8,664.37 6,552.86 2,916.04 5,967,249.715 678,849.710 18.64 2,916.04 15,306.19 88.31 299.55 8,726.34 8,665.34 6,568.39 2,884.65 5,967,264.511 678,817.963 18.37 2,884.65 15,340.87 87.39 305.22 8,727.65 8,666.65 6,586.95 2,855.40 5,967,282.372 678,788.285 16.55 2,855.40 15,372.09 86.99 307.54 8,729.18 8,668.18 6,605.44 2,830.29 5,967,300.272 678,762.756 7.53 2,83029 15,400.69 88.83 304.69 8,730.22 8,669.22 6,622.28 2,807.21 5,967,316.568 678,739.284 11.86 2,807.21 15,435.95 95.35 303.64 8,728.94 8,667.94 6,642.06 2,778.07 5,967,335.657 678,709.691 18.73 2,778.07 15,466.06 94.06 301.87 8,726.47 8,665.47 6,658.29 2,752.83 5,967,351.295 678,684.084 7.26 2,752.83 15,495.92 93.56 299.97 8,724.48 8,663.48 6,673.60 2,727.27 5,967,365.999 678,658.175 6.57 2,727.27 15,525.49 90.18 296.21 8,723.52 8,662.52 6,687.51 2,701.21 5,967,379.294 678,631.793 17.09 2,701.21 15,556.05 93.32 294.03 8,722.58 8,661.58 6,700.48 2,673.56 5,967,391.607 678,603.847 12.51 2,673.56 15,586.19 95.75 291.34 8,720.20 8,659.20 6,712.07 2,645.84 5,967,402.540 678,575.869 12.01 2,645.84 15,611.15 99.68 291.20 8,716.85 8,655.85 6,721.04 2,622.80 5,967,410.968 678,552.622 15.75 2,622.80 1/3/2017 4:39:30PM Page 12 COMPASS 5000.1 Build 81B f 000 b BP p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16C P B2 Design: 15-16CPB2 Survey Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 15-16 15-16B @ 61.00usft (Nabors 7ES) 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 15,650.00 99.68 291.20 8,710.32 8,649.32 6,734.89 2,587.09 5,967,423.976 678,516.605 0.00 2,587.09 Projection to TD Design Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 13,610.00 8,687.31 6,614.32 4,514.24 15-16CPB2 TIP to 15-16CPB1 13,635.27 8,688.38 6,621.41 4,490.01 15-16CPB2 KOP- Billet 15,650.00 8,710.32 6,734.89 2,587.09 Projection to TO Prepared By: Yosha Ragbirsingh Survey Manager, Baker Hughes 1/3/2017 4:39:30PM Page 13 COMPASS 5000.1 Build 81B North America - ALASKA - BP Prudhoe Bay PB DS 15 15-16 15-16C 500292111503 Design: 15-16C Final Survey Report 03 January, 2017 BAKER HUGHES I +, by Final Surveey Report BA R•• HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16C Design: 15-16C Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 15-16 15-16B @ 61.00usft (Nabors 7ES) 15-168 @ 61.00usft (Nabors 7ES) True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 * OGP-Usa AK [4267*15864] Using Well Reference Point Map Zone: NAD27 * OGP-Usa AK /Alaska zone 4 [26734*1586, • Using geodetic scale factor Site PB DS 15, TR -11-14 Site Position: Northing: 5,958,837.360 usft Latitude: 70° 17' 35.236 N From: Map Easting: 676,296.980 usft Longitude: 148° 34'21.213 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.34 ° Well 15-16, 15-16 - - - -- -- - - Well Position +N/ -S 0.00 usft Northing: 5,960,630.760 usft Latitude: 70° 17'52.919 N +E1 -W 0.00 usft Easting: 676,088.190 usft Longitude: 148° 34'26.072 W Position Uncertainty 0.00 usft Wellhead Elevation: 36.02 usft Ground Level: 33.16 usft Wellbore 15-16C -- Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGG M2016 1/1/2017 18.14 81.02 57,558 Design 15-16C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 15,080.69 Vertical Section: Depth From (TVD) +N/ -S +EI W (usft) (usft) 24.98 0.00 Direction (usft) (°) 0.00 17.70 1/3/2017 4:24:19PM Page 2 COMPASS 5000.1 Build 818 by BP Final Survey Report Company: North America - ALASKA - BP Well 15-16 Project: Prudhoe Bay Inc Site: PB DS 15 24.98 Well: 15-16 90.00 0.37 Wellbore: 15-16C 0.43 290.00 Design: 15-16C 390.00 0.51 Survey Program Date 1/3/2017 590.00 From To 0.41 (usft) (usft) Survey (Wellbore) Tool Name 90.00 4,540.00 15-16 Srvy 2 GYD CT CMS (15-16) GYD-CT-CMS 4,587.00 4,604.00 15-16BPB1 Srvy 1 Blind (15-16BPB1) BLIND 4,626.54 4,720.47 15-16BPB1 Srvy 2 Inc+Trend (15-16BPB1 INC+TREND 4,813.93 12,335.13 15-16BPB1 Srvy 3 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA 12,409.41 12,912.00 15-16BPB1 Srvy 4 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA 12,938.02 13,281.94 15-16B Srvy 1 MWD+IFR+MS (15-16B) MWD+IFR+MS-WOCA 13,289.50 15,080.69 15-16CPB2 CTK MWD 4-1/4" (15-16CPB2 MWD 15,100.00 16,071.93 15-16C CTK MWD 4-1/4" (15-16C) MWD Survey Well 15-16 MD Inc (usft) (°1 24.98 0.00 90.00 0.37 190.00 0.43 290.00 0.36 390.00 0.51 490.00 0.43 590.00 0.49 690.00 0.41 790.00 0.12 890.00 0.37 990.00 0.43 1,090.00 0.32 1,190.00 0.30 1,290.00 0.40 1,390.00 0.40 1,490.00 0.31 1,590.00 0.46 rias BAKER HUGHES Local Co-ordinate Reference: Well 15-16 TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) MD Reference: 15-16B @ 61.00usft (Nabors 7ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Description Gyrodata cont.casing m/s Blind drilling Inclinometer+ known azi trend MWD + IFR + Multi Station W/O Crustal MWD + IFR + Multi Station W/O Crustal MWD + IFR + Multi Station W/O Crustal MWD - Standard MWD - Standard Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) 0.00 24.98 -36.02 0.00 0.00 5,960,630.760 676,088.190 0.00 179.86 90.00 29.00 -0.21 0.00 5,960,630.550 676,088.195 0.57 158.08 190.00 129.00 -0.88 0.14 5,960,629.883 676,088.352 0.16 180.27 289.99 228.99 -1.54 0.28 5,960,629.224 676,088.506 0.17 168.24 389.99 328.99 -2.29 0.37 5,960,628.476 676,088.613 0.17 179.07 489.99 428.99 -3.10 0.47 5,960,627.668 676,088.729 0.12 164.12 589.99 528.99 -3.89 0.59 5,960,626.885 676,088.870 0.13 178.64 689.98 628.98 -4.66 0.71 5,960,626.119 676,089.014 0.14 121.30 789.98 728.98 -5.07 0.81 5,960,625.709 676,089.121 0.36 81.65 889.98 828.98 -5.08 1.22 5,960,625.711 676,089.530 0.29 85.77 989.98 928.98 -5.00 1.92 5,960,625.802 676,090.222 0.07 93.93 1,089.98 1,028.98 -5.00 2.57 5,960,625.826 676,090.874 0.12 72.48 1,189.97 1,128.97 -4.94 3.10 5,960,625.898 676,091.401 0.12 81.01 1,289.97 1,228.97 -4.60 3.69 5,960,626.045 676,091.992 0.11 115.46 1,389.97 1,328.97 -4.90 4.35 5,960,625.965 676,092.654 0.24 96.64 1,489.97 1,428.97 -5.08 4.93 5,960,625.797 676,093.242 0.15 131.91 1,589.97 1,528.97 -5.38 5.50 5,960,625.511 676,093.816 0.27 V. Sec (usft) 0.00 -0.20 -0.80 -1.38 -2.07 -2.82 -3.53 -4.22 -4.58 -4.47 -4.19 -3.98 -3.76 -3.45 -3.34 -3.34 -3.45 1/3/2017 4:24:19PM Page 3 COMPASS 5000.1 Build 81B ti p BP WI•■ Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay ND Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16C Survey Calculation Method: Minimum Curvature Design: 15-16C Database: EDM R5K - Alaska PROD - ANCP1 Survey - - - - - MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 1,690.00 0.41 126.75 1,689.96 1,628.96 -5.86 6.09 5,960,625.043 676,094.413 0.06 -3.73 1,790.00 0.28 164.95 1,789.96 1,728.96 -6.31 6.44 5,960,624.601 676,094.773 0.26 -4.06 1,890.00 0.34 163.56 1,889.96 1,828.96 -6.83 6.58 5,960,624.085 676,094.933 0.06 -4.51 1,990.00 0.53 67.10 1,989.96 1,928.96 -6.94 7.09 5,960,623.992 676,095.445 0.66 -4.451 2,090.00 0.64 69.28 2,089.95 2,028.95 -6.56 8.04 5,960,624.392 676,096.384 0.11 -3.80 2,190.00 0.60 82.25 2,189.95 2,128.95 -6.29 9.08 5,960,624.684 676,097.419 0.15 -3.23 I 2,290.00 0.86 153.02 2,289.94 2,228.94 -6.89 9.94 5,960,624.106 676,098.292 0.87 -3.541 2,390.00 0.96 160.89 2,389.93 2,328.93 8.35 10.56 5,960,622.661 676,098.941 0.16 -4.74 2,485.00 0.89 153.98 2,484.92 2,423.92 -9.77 11.14 5,960,621.258 676,099.559 0.14 -5.921 13 318" 2,490.00 0.89 153.59 2,489.92 2,428.92 -9.84 11.18 5,960,621.189 676,099.595 0.14 -5.971 2,590.00 1.43 24.44 2,589.90 2,528.90 -9.40 12.04 5,960,621.649 676,100.446 2.11 -5.29 2,690.00 4.99 19.36 2,689.73 2,628.73 -4.16 14.00 5,960,626.934 676,102.281 3.57 0.3011 2,790.00 6.55 12.61 2,789.22 2,728.22 5.51 16.69 5,960,636.664 676,104.741 1.70 10.33 2,890.00 8.25 7.65 2,888.39 2,827.39 18.19 18.89 5,960,649.389 676,106.644 1.81 23.07 2,990.00 9.99 13.86 2,987.12 2,926.12 33.73 21.92 5,960,664.988 676,109.312 2.00 38.79 3,090.00 11.39 28.91 3,085.40 3,024.40 50.80 28.77 5,960,682.212 676,115.763 3.11 57.14 3,190.00 12.85 35.21 3,183.18 3,122.18 68.53 39.96 5,960,700.199 676,126.530 1.97 77.43 3,290.00 13.38 25.23 3,280.58 3,219.58 88.08 51.30 5,960,720.013 676,137.412 2.32 99.51 3,340.00 14.04 24.08 3,329.16 3,268.16 98.85 56.24 5,960,730.896 676,142.099 1.43 111.27 3,390.00 14.79 23.96 3,377.58 3,316.58 110.22 61.31 5,960,742.380 676,146.897 1.50 123.64 3,440.00 15.54 24.87 3,425.84 3,364.84 122.13 66.72 5,960,754.412 676,152.025 1.57 136.63 3,490.00 16.40 26.22 3,473.91 3,412.91 134.54 72.65 5,960,766.956 676,157.668 1.87 150.261 3,540.00 17.20 27.38 3,521.78 3,460.78 147.44 79.17 5,960,780.001 676,163.882 1.73 164.53 3,590.00 18.81 29.52 3,569.33 3,508.33 161.02 86.55 5,960,793.749 676,170.933 3.48 179.71 3,640.00 20.34 30.37 3,616.43 3,555.43 175.53 94.91 5,960,808.453 676,178.956 3.11 196.08 3,690.00 21.45 31.12 - 3,663.15 3,602.15 190.85 104.03 5,960,823.986 676,187.713 2.28 213.451'1 1/3/2017 4:24:19PM Page 4 COMPASS 5000.1 Build 818 401 BPb r.N 1104e Final Survey Repo BAKER Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16C Survey Calculation Method: Minimum Curvature Design: 15-16C Database: EDM R5K-Alaska PROD -ANCP1 Survey - - MD Inc Azi (azimuth) 7VD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 3,740.00 22.83 31.56 3,709.46 3,648.46 206.95 113.83 5,960,840.302 676,197.135 2.78 231.76 3,790.00 24.12 31.76 3,755.32 3,694.32 223.90 124.29 5,960,857.494 676,207.189 2.58 251.09 3,840.00 25.64 31.75 3,800.68 3,739.68 241.78 135.36 5,960,875.634 676,217.837 3.04 271.491, 3,890.00 27.86 31.39 3,845.32 3,784.32 260.96 147.14 5,960,895.078 676,229.162 4.45 293.34 3,940.00 29.43 31.59 3,889.20 3,828.20 281.40 159.66 5,960,915.802 676,241.200 3.15 316.62 3,990.00 31.04 31.61 3,932.40 3,871.40 302.84 172.85 5,960,937.547 676,253.885 3.22 341.06 4,040.00 32.33 31.79 3,974.95 3,913.95 325.18 186.65 5,960,960.207 676,267.158 2.59 366.541 4,090.00 33.53 32.30 4,016.91 3,955.91 348.22 201.07 5,960,983.574 676,281.036 2.46 392.87 4,140.00 34.98 32.84 4,058.24 3,997.24 371.94 216.23 5,961,007.637 676,295.627 2.96 420.071 4,190.00 36.31 33.17 4,098.87 4,037.87 396.37 232.10 5,961,032.435 676,310.922 2.69 448.181 4,240.00 38.51 33.62 4,138.58 4,077.58 421.73 248.82 5,961,058.175 676,327.043 4.43 477.42 4,290.00 40.39 33.70 4,177.19 4,116.19 448.17 266.43 5,961,085.021 676,344.026 3.76 507.96 4,340.00 42.01 33.81 4,214.81 4,153.81 475.55 284.73 5,961,112.822 676,361.678 3.24 539.61 4,390.00 43.50 33.74 4,251.52 4,190.52 503.77 303.60 5,961,141.468 676,379.880 2.98 572.23 4,440.00 44.46 33.81 4,287.50 4,226.50 532.63 322.90 5,961,170.771 676,398.499 1.92 605.59 4,490.00 45.45 33.90 4,322.88 4,261.88 561.96 342.58 5,961,200.559 676,417.486 1.98 639.52 4,540.00 47.24 34.25 4,357.40 4,296.40 591.93 362.85 5,961,230.986 676,437.045 3.62 674.231 4,587.00 49.09 34.55 4,388.74 4,327.74 620.82 382.63 5,961,260.332 676,456.146 3.96 707.77 95/81, 4,604.00 49.90 37.00 4,399.79 4,338.79 631.30 390.19 5,961,270.990 676,463.455 11.95 720.06 4,626.54 49.22 38.00 4,414.41 4,353.41 644.91 400.63 5,961,284.840 676,473.575 4.53 736.20 4,720.47 51.78 43.80 4,474.18 4,413.18 699.60 448.10 5,961,340.626 676,519.742 5.49 802.73 4,813.93 56.37 48.05 4,529.02 4,468.02 752.16 502.49 5,961,394.434 676,572.886 6.14 869.33 4,906.86 59.65 44.78 4,578.25 4,517.25 806.51 559.53 5,961,450.102 676,628.638 4.62 938.461 5,003.33 62.85 48.04 4,624.66 4,563.66 864.78 620.80 5,961,509.787 676,688.516 4.45 1,012.60 5,096.00 65.42 41.60 4,665.11 4,604.11 923.91 679.49 5,961,570.279 676,745.804 6.84 1,086.78 5,193.19 66.05 41.60 4,705.05 4,644.05 990.17 738.32 5,961,637.892 676,803.058 0.65 1,167.791 11312017 4:24:19PM Page 5 COMPASS 5000.1 Build 81B h p BP ��•• ti, ^' Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Project: Prudhoe Bay Local Co-ordinate Reference: Well 15-16 Site: PB DS 15 TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15 15-16 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Wellbore: 15-16C North Reference: True Design: 15-16C Survey Calculation Method: Minimum Curvature - - - - Database: EDM R5K - Alaska PROD - ANCP1 Survey - MD Inc (usft) (°) Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 5,286.33 66.86 41.77 4,742.26 4,681.26 1,053.94 795.10 5,961,702.967 676,858.329 0.89 1,245.80 5,378.55 66.00 40.77 4,779.14 4,718.14 1,117.46 850.86 5,961,767.779 676,912.576 1.36 1,323.27 5,472.62 64.46 39.04 4,818.55 4,757.55 1,182.98 905.65 5,961,834.553 676,965.820 2.34 1,402.35 5,570.80 65.40 38.90 4,860.15 4,799.15 1,252.12 961.58 5,961,904.981 677,020.109 0.97 1,485.22 5,666.46 63.33 38.54 4,901.54 4,840.54 1,319.40 1,015.53 5,961,973.506 677,072.460 2.19 1,565.72 5,757.98 63.20 38.03 4,942.71 4,881.71 1,383.56 1,066.17 5,962,038.828 677,121.581 0.52 1,642.241 5,852.93 63.06 39.82 4,985.63 4,924.63 1,449.45 1,119.38 5,962,105.942 677,173.232 1.69 1,721.19 5,947.04 63.90 43.51 5,027.66 4,966.66 1,512.33 1,175.36 5,962,170.116 677,227.712 3.62 1,798.12 6,041.27 64.55 44.66 5,068.63 5,007.63 1,573.28 1,234.39 5,962,232.428 677,285.300 1.30 1,874.13 6,136.26 64.38 47.07 5,109.59 5,048.59 1,632.96 1,295.90 5,962,293.529 677,345.389 2.30 1,949.69 6,230.93 65.05 46.45 5,150.02 5,089.02 1,691.60 1,358.26 5,962,353.611 677,406.351 0.92 2,024.51 6,259.71 65.49 46.48 5,162.06 5,101.06 1,709.61 1,377.21 5,962,372.054 677,424.873 1.53 2,047.43 6,318.80 67.15 45.22 5,185.79 5,124.79 1,747.30 1,416.03 5,962,410.645 677,462.800 3.42 2,095.14 6,368.92 63.86 46.23 5,206.57 5,145.57 1,779.14 1,448.68 5,962,443.237 677,494.691 6.82 2,135.40 6,410.76 61.23 46.69 5,225.86 5,164.86 1,804.71 1,475.59 5,962,469.434 677,520.992 6.36 2,167.95 6,504.67 61.20 47.28 5,271.08 5,210.08 1,860.86 1,535.77 5,962,526.973 677,579.836 0.55 2,239.74 6,596.18 61.28 48.08 5,315.11 5,254.11 1,914.87 1,595.08 5,962,582.354 677,637.865 0.77 2,309.22 6,699.05 61.46 47.28 5,364.40 5,303.40 1,975.66 1,661.84 5,962,644.689 677,703.179 0.70 2,387.44 6,796.68 61.11 47.94 5,411.31 5,350.31 2,033.39 1,725.08 5,962,703.876 677,765.043 0.69 2,461.66 6,886.49 61.53 47.54 5,454.41 5,393.41 2,086.37 1,783.39 5,962,758.211 677,822.094 0.61 2,529.87 6,980.91 60.83 46.42 5,499.93 5,438.93 2,142.81 1,843.88 5,962,816.045 677,881.233 1.28 2,602.02 7,075.82 62.24 46.48 5,545.16 5,484.16 2,200.29 1,904.35 5,962,874.927 677,940.337 1.49 2,675.17 7,170.28 61.35 44.92 5,589.81 5,528.81 2,258.43 1,963.92 5,962,934.436 677,998.532 1.73 2,748.67 7,264.26 61.13 43.53 5,635.03 5,574.03 2,317.46 2,021.39 5,962,994.798 678,054.591 1.32 2,822.38 7,357.92 64.10 44.99 5,678.10 5,617.10 2,377.00 2,079.43 5,963,055.680 678,111.219 3.46 2,896.75 7,453.73 66.20 45.16 5,718.37 5,657.37 2,438.40 2,140.98 5,963,118.491 678,171.312 2.20 2,973.95 7,548.68 66.40 45.16 5,756.53 5,695.53 2,499.70 - - 2,202.63 - - - - 5,963,181.220 - - 678,231.504 - 0.21 3,051.10 1/3/2017 4:24:19PM - - - - - - - - - Page 6 COMPASS 5000.1 Build 81B 1/3/2017 4:24:19PM Page 7 COMPASS 5000.1 Build 818 byBP rias Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Local Coordinate Reference: Well 15-16 Site: PB DS 15 TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Wellbore: 15-16C North Reference: True Survey Calculation Method: Minimum Curvature Design: 15-16C - - Database: EDM R5K - Alaska PROD - ANCP1 Survey - - - - - - - MD Inc (usft) (°) Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 7,643.91 66.66 45.51 5,794.46 5,733.46 2,561.10 2,264.76 5,963,244.059 678,292.171 0.43 3,128.49 7,734.70 66.23 45.30 5,830.74 5,769.74 2,619.54 2,324.02 5,963,303.859 678,350.045 0.52 3,202.18 7,829.73 66.95 45.54 5,868.50 5,807.50 2,680.75 2,386.14 5,963,366.505 678,410.706 0.79 3,279.38 7,924.91 66.18 45.79 5,906.35 5,845.35 2,741.78 2,448.60 5,963,428.977 678,471.717 0.84 3,356.51 8,022.53 66.32 45.30 5,945.67 5,884.67 2,804.35 2,512.38 5,963,493.028 678,534.009 0.48 3,435.52 8,116.99 65.94 44.40 5,983.89 5,922.89 2,865.59 2,573.30 5,963,555.673 678,593.473 0.96 3,512.38 8,210.59 65.92 43.97 6,022.07 5,961.07 2,926.88 2,632.86 5,963,618.331 678,651.581 0.42 3,588.87 8,303.68 66.06 43.13 6,059.94 5,996.94 2,988.51 2,691.45 5,963,681.314 678,708.705 0.84 3,665.40 8,397.95 65.51 42.44 6,098.61 6,037.61 3,051.60 2,749.85 5,963,745.758 678,765.605 0.89 3,743.271 8,490.59 65.38 41.74 6,137.11 6,076.11 3,114.13 2,806.33 5,963,809.589 678,820.601 0.70 3,820.01 8,584.52 65.53 39.71 6,176.13 6,115.13 3,178.88 2,862.07 5,963,875.621 678,874.806 1.97 3,898.64 8,678.96 65.55 38.62 6,215.24 6,154.24 3,245.53 2,916.36 5,963,943.520 676,927.516 1.05 3,978.64 8,776.77 65.64 38.11 6,255.65 6,194.65 3,315.37 2,971.64 5,964,014.629 678,981.143 0.48 4,061.98 8,872.08 65.77 39.26 6,294.87 6,233.87 3,383.18 3,025.94 5,964,083.686 679,033.832 1.11 4,143.09 8,966.07 65.72 40.92 6,333.46 6,272.48 3,448.73 3,081.12 5,964,150.512 679,087.460 1.61 4,222.32 9,059.53 65.45 41.68 6,372.11 6,311.11 3,512.67 3,137.29 5,964,215.740 679,142.110 0.79 4,300.31 1 9,153.43 65.49 41.05 6,411.09 6,350.09 3,576.78 3,193.74 5,964,281.154 679,197.041 0.61 4,378.55 9,247.90 65.39 40.28 6,450.36 6,389.36 3,641.95 3,249.73 5,964,347.618 679,251.485 0.75 4,457.66 9,343.13 65.39 39.26 6,490.02 6,429.02 3,708.50 3,305.11 5,964,415.439 679,305.292 0.97 4,537.90 9,436.42 65.42 39.65 6,528.85 6,467.85 3,773.99 3,359.02 5,964,482.175 679,357.643 0.38 4,616.69 9,531.09 65.49 39.44 6,568.17 6,507.17 3,840.40 3,413.85 5,964,549.843 679,410.897 0.21 4,696.62 9,624.40 65.35 38.85 6,606.99 6,545.99 3,906.21 3,467.41 5,964,616.884 679,462.904 0.59 4,775.60 9,718.66 65.40 38.86 6,646.26 6,585.26 3,972.94 3,521.17 5,964,684.849 679,515.079 0.05 4,855.51 9,812.95 65.32 38.39 6,685.57 6,624.57 4,039.89 3,574.67 5,964,753.036 679,566.990 0.46 4,935.57 9,908.17 65.45 39.06 6,725.24 6,664.24 4,107.43 3,628.82 5,964,821.817 679,619.544 0.65 5,016.37 10,002.84 65.73 39.81 6,764.36 6,703.36 4,174.01 3,683.58 5,964,889.658 679,672.725 0.78 5,096.45 10,097.24 66.79 - 41.45 6,802.37 6,741.37 4,239.58 3,739.85 5,964,956.528 679,727.439 1.95 5,176.03 li 1/3/2017 4:24:19PM Page 7 COMPASS 5000.1 Build 818 BP //. M 'It1� 1'' Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Project: Prudhoe Bay Local Co-ordinate Reference: Well 15-16 Site: DS 15 ND Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Wellbore: 15-16C North Reference: True Design: 15-16C Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Survey - - - - - MD Inc (usft) (°) Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec 10,193.30 66.02 (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 43.10 6,840.82 6,779.82 4,304.72 3,799.06 5,965,023.027 679,785.103 1.77 5,256.08 10,286.68 65.22 45.46 6,879.37 6,818.37 4,365.61 3,858.43 5,965,085.288 679,843.027 2.46 5,332.141 10,381.40 65.65 45.37 6,918.75 6,857.75 4,426.08 3,919.79 5,965,147.177 679,902.944 0.46 5,408.41 10,476.11 65.93 45.43 6,957.58 6,896.58 4,486.73 3,981.29 5,965,209.250 679,963.007 0.30 5,484.89 10,569.67 65.90 45.52 6,995.77 6,934.77 4,546.62 4,042.19 5,965,270.551 680,022.479 0.09 5,560.471 10,664.13 65.90 45.38 7,034.34 6,973.34 4,607.11 4,103.64 5,965,332.460 680,082.489 0.14 5,636.78 10,757.63 63.84 44.46 7,074.04 7,013.04 4,667.05 4,163.41 5,965,393.772 680,140.837 2.38 5,712.05 10,853.14 60.04 43.42 7,118.96 7,057.96 4,727.71 4,221.89 5,965,455.790 680,197.878 4.09 5,787.62 10,947.88 57.26 40.47 7,168.25 7,107.25 4,787.86 4,275.98 5,965,517.179 680,250.540 3.96 5,861.37 11,039.80 11,135.27 53.73 39.27 7,220.32 7,159.32 4,845.97 4,324.54 5,965,576.413 680,297.724 3.99 5,931.50 51.98 36.23 7,277.97 7,216.97 4,906.11 4,371.14 5,965,637.627 680,342.896 3.13 6,002.96 11,228.64 51.31 33.78 7,335.92 7,274.92 4,966.08 4,413.14 5,965,698.552 680,383.479 2.18 6,072.85 11,323.20 50.84 31.00 7,395.34 7,334.34 5,028.18 4,452.55 5,965,761.559 680,421.415 2.34 6,144.00 11,417.12 49.15 29.95 7,455.71 7,394.71 5,090.18 4,489.04 5,965,824.388 680,456.441 1.99 6,214.16 1 11,512.52 46.22 28.86 7,519.93 7,458.93 5,151.62 4,523.68 5,965,886.619 680,489.635 3.19 6,283.22 11,607.94 43.19 28.33 7,587.74 7,526.74 5,210.54 4,555.81 5,965,946.277 680,520.373 3.20 6,349.13 11,700.55 40.75 26.16 7,656.59 7,595.59 5,265.58 4,584.18 5,966,001.960 680,547.445 3.07 6,410.18 11,795.50 37.26 20.32 7,730.39 7,669.39 5,320.38 4,607.84 5,966,057.301 680,569.812 5.33 6,469.59 11,890.04 33.52 15.98 7,807.46 7,746.46 5,372.34 4,624.98 5,966,109.645 680,585.723 4.76 6,524.30 11,984.92 34.83 15.02 7,885.96 7,824.96 5,423.70 4,639.21 5,966,161.318 680,598.749 1.49 6,577.55 12,079.57 34.93 14.55 7,963.61 7,902.61 5,476.04 4,653.02 5,966,213.958 680,611.331 0.30 6,631.61 12,173.85 35.46 17.28 8,040.66 7,979.66 5,528.28 4,667.93 5,966,266.532 680,625.007 1.76 6,685.91 12,268.00 34.76 18.75 8,117.68 8,056.68 5,579.77 4,684.67 5,966,318.401 680,640.535 1.17 6,740.05 12,335.13 34.68 17.99 8,172.85 8,111.85 5,616.06 4,696.72 5,966,354.956 680,651.730 0.66 6,778.29 12,398.00 34.74 17.59 8,224.54 8,163.54 5,650.14 4,707.66 5,966,389.288 680,661.866 0.37 6,814.09 7" 12,409.41 34.75 17.52 8,233.91 8,172.91 5,656.34 4,709.62 5,966,395.532 680,663.682 0.37 6,820.59 1/3/2017 4:24:19PM Page 8 COMPASS 5000.1 Build 818 e0% by BP RUG W Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well 15-16 Project: Prudhoe Bay Site: PB DS 15 TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Wellbore: 15-16C North Reference: True Survey Calculation Method: Minimum Curvature Design: 15-16C - - Database: EDM R5K - Alaska PROD - ANCP1 Survey - - - - MD Inc (usft) (°) Azi (azimuth) ND TVDSS N/S EIW Northing Easting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 12,439.21 34.56 17.51 8,258.42 8,197.42 5,672.50 4,714.72 5,966,411.806 680,668.401 0.64 6,837.53 12,470.89 37.18 15.35 8,284.09 8,223.09 5,690.31 4,719.96 5,966,429.726 680,673.221 9.18 6,856.09 12,503.45 40.47 13.47 8,309.46 8,248.46 5,710.08 4,725.02 5,966,449.608 680,677.823 10.73 6,876.46 12,534.30 39.83 12.73 8,333.04 8,272.04 5,729.45 4,729.53 5,966,469.080 680,681.877 2.59 6,896.29 12,567.14 41.78 8.81 8,357.90 8,296.90 5,750.53 4,733.53 5,966,490.242 680,685.376 9.80 6,917.58 11 12,598.01 45.60 7.12 8,380.22 8,319.22 5,771.64 4,736.47 5,966,511.418 680,687.823 12.94 6,938.59 12,629.48 45.23 7.03 8,402.31 8,341.31 5,793.88 4,739.23 5,966,533.718 680,690.062 1.19 6,960.62 12,661.36 47.37 4.19 8,424.34 8,363.34 5,816.82 4,741.47 5,966,556.695 680,691.766 9.30 6,983.15 12,692.54 51.10 1.51 8,444.69 8,383.69 5,840.39 4,742.63 5,966,580.293 680,692.372 13.62 7,005.96 12,723.54 50.73 1.56 8,464.24 8,403.24 5,864.45 4,743.28 5,966,604.354 680,692.452 1.20 7,029.07 12,755.41 50.67 1.34 8,484.42 8,423.42 5,889.10 4,743.90 5,966,629.015 680,692.499 0.57 7,052.75 12,787.08 53.01 1.18 8,503.99 8,442.99 5,914.00 4,744.45 5,966,653.913 680,692.462 7.40 7,076.63 12,818.21 58.28 0.83 8,521.55 8,460.55 5,939.68 4,744.90 5,966,679.601 680,692.308 16.95 7,101.24 12,850.06 59.27 1.28 8,538.06 8,477.06 5,966.91 4,745.40 5,966,706.835 680,692.172 3.33 7,127.33 12,881.58 62.72 359.99 8,553.34 8,492.34 5,994.47 4,745.70 5,966,734.393 680,691.827 11.52 7,153.68 12,912.00 66.73 359.42 8,566.33 8,505.33 6,021.98 4,745.55 5,966,761.882 680,691.038 13.29 7,179.83 4 112' 12,938.02 66.96 0.31 8,576.56 8,515.56 6,045.90 4,745.50 5,966,785.796 680,690.422 3.27 7,202.61 12,969.25 62.70 358.81 8,589.84 8,528.84 6,074.16 4,745.29 5,966,814.038 680,689.549 14.32 7,229.46 13,000.02 65.52 355.30 8,603.28 8,542.28 6,101.79 4,743.86 5,966,841.631 680,687.470 13.76 7,255.35 13,032.34 68.81 354.07 8,615.82 8,554.82 6,131.45 4,741.09 5,966,871.210 680,684.014 10.77 7,282.76 13,062.36 72.07 353.91 8,625.87 8,564.87 6,159.57 4,738.13 5,966,899.259 680,680.394 10.87 7,308.66 13,092.77 75.99 351.48 8,634.24 8,573.24 6,188.56 4,734.41 5,966,928.152 680,675.994 15.01 7,335.141 13,124.60 78.73 351.17 8,641.20 8,580.20 6,219.26 4,729.72 5,966,958.732 680,670.591 8.66 7,362.97 13,156.96 79.16 351.10 8,647.40 8,586.40 6,250.64 4,724.83 5,966,989.987 680,664.963 1.35 7,391.37 13,187.96 79.46 351.23 8,653.16 8,592.16 6,280.74 4,720.15 5,967,019.967 680,659.581 1.05 7,418.621 13,219.79 79.60 351.18 8,658.94 8,597.94 6,311.68 4,715.37 5,967,050.777 680,654.072 0.47 7,446.64 1/3/2017 4:24:19PM Page 9 COMPASS 5000.1 Build 818 BP 104) bpFinal Surrey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16C Design: 15-16C Survey MD (usft) 13,251.13 13, 281.94 13, 289.50 13, 309.63 13,337.38 13,367.45 13, 397.57 13,427.65 13,457.43 13, 487.83 13, 517.43 13,547.71 13, 577.65 13, 607.66 13, 610.00 13, 635.27 13,665.51 13,696.02 13,725.56 13, 755.42 13,785.50 13, 815.66 13, 845.44 13,875.71 13,905.42 13, 935.63 13,965.58 Inc Azi (azimuth) 79.81 350.82 80.23 351.08 80.33 350.88 84.22 347.74 89.01 343.46 89.97 338.86 89.72 333.17 88.80 326.95 88.31 319.87 87.33 314.24 85.75 307.19 85.61 300.46 84.99 293.34 85.64 286.28 85.62 285.79 89.51 286.85 91.41 284.39 90.31 281.37 89.88 277.50 90.03 273.98 89.91 270.63 89.82 266.71 90.15 263.03 88.68 258.37 89.36 253.77 90.98 250.90 89.85 247.08 1/3/2017 4:24:19PM Page 10 COMPASS 5000.1 Build 818 Local Coordinate Reference: Well 15-16 ND Reference: 15-16B @ 61.00usft (Nabors 7ES) MD Reference: 15-16B @ 61.00usft (Nabors 7ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 ND TVDSS N/S EIW Northing Easting DLeg V. Sec (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 8,664.54 8,603.54 6,342.13 4,710.54 5,967,081.109 680,648.536 1.31 7,474.18 8,669.88 8,608.88 6,372.10 4,705.77 5,967,110.953 680,643.063 1.60 7,501.28 8,671.16 8,610.16 6,379.46 4,704.60 5,967,118.283 680,641.723 2.89 7,507.93 8,673.86 8,612.86 6,399.05 4,700.90 5,967,137.784 680,637.564 24.75 7,525.48 8,675.50 8,614.50 6,425.87 4,694.01 5,967,164.430 680,630.050 23.13 7,548.93 8,675.77 8,614.77 6,454.32 4,684.31 5,967,192.643 680,619.680 15.63 7,573.08 8,675.85 8,614.85 6,481.83 4,672.07 5,967,219.854 680,606.801 18.91 7,595.56 8,676.24 8,615.24 6,507.88 4,657.06 5,967,245.544 680,591.192 20.90 7,615.82 8,676.99 8,615.99 6,531.77 4,639.33 5,967,269.009 680,572.904 23.82 7,633.18 8,678.15 8,617.15 6,553.99 4,618.64 5,967,290.745 680,551.702 18.78 7,648.07 8,679.94 8,618.94 6,573.25 4,596.26 5,967,309.475 680,528.880 24.37 7,659.61 8,682.22 8,621.22 6,590.05 4,571.19 5,967,325.680 680,503.426 22.17 7,667.99 8,684.68 8,623.68 6,603.54 4,544.60 5,967,338.545 680,476.526 23.79 7,672.76 8,687.13 8,626.13 6,613.67 4,516.48 5,967,348.011 680,448.177 23.55 7,673.86 8,687.31 8,626.31 6,614.32 4,514.24 5,967,348.603 680,445.920 20.99 7,673.79 8,688.38 8,627.38 6,621.41 4,490.01 5,967,355.126 680,421.537 15.97 7,673.18 8,688.14 8,627.14 6,629.55 4,460.89 5,967,362.582 680,392.237 10.28 7,672.08 8,687.68 8,626.68 6,636.35 4,431.16 5,967,368.682 680,362.353 10.53 7,669.52 8,687.63 8,626.63 6,641.19 4,402.02 5,967,372.840 680,333.115 13.18 7,665.271 8,687.66 8,626.66 6,644.18 4,372.32 5,967,375.128 680,303.349 11.80 7,659.08 8,687.67 8,626.67 6,645.39 4,342.27 5,967,375.634 680,273.280 11.14 7,651.10 8,687.74 8,626.74 6,644.69 4,312.12 5,967,374.228 680,243.160 13.00 7,641.26 8,687.75 8,626.75 6,642.03 4,282.46 5,967,370.871 680,213.577 12.41 7,629.71 8,688.06 8,627.06 6,637.14 4,252.60 5,967,365.283 680,183.840 16.14 7,615.97 8,688.57 8,627.57 6,629.99 4,223.78 5,967,357.461 680,155.194 15.65 7,600.39 8,688.46 8,627.48 6,620.82 4,195.00 5,967,347.624 680,126.637 10.91 7,582.91 1 8,688.26 8,627.26 6,610.09 4,167.04 5,967,336.237 680,098.945 13.30 7,564.18 1/3/2017 4:24:19PM Page 10 COMPASS 5000.1 Build 818 �+.BP 5 p Final Survey ReportBAK R•■ HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16C Design: 15-16C Survey MD (usft) 13, 995.54 14,025.43 14,057.01 14, 085.50 14,114.17 14,146.26 14,180.68 14,210.74 14,240.61 14,275.63 14,305.96 14, 335.85 14,365.93 14, 395.89 14,426.00 14,455.62 14,485.47 14,515.70 14, 551.09 14,575.38 14,630.54 14,660.98 14,690.35 14,720.40 14,749.66 14, 780.91 14, 811.78 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Inc Azi (azimuth) ND TVDSS N/S E/W (°/100usft) (usft) (usft) (usft) (usft) (usft) 89.14 241.90 8,688.53 8,627.53 6,597.19 4,140.02 90.34 238.91 8,688.66 8,627.66 6,582.43 4,114.03 92.80 238.35 8,687.80 8,626.80 6,566.00 4,087.06 92.92 242.26 8,686.38 8,625.38 6,551.90 4,062.37 92.27 245.99 8,685.08 8,624.08 6,539.41 4,036.60 92.67 252.00 8,683.69 8,622.69 6,527.92 4,006.68 89.97 255.77 8,682.90 8,621.90 6,518.37 3,973.63 90.55 257.60 8,682.76 8,621.76 6,511.45 3,944.38 89.94 262.09 8,682.64 8,621.64 6,506.18 3,914.99 88.96 266.57 8,682.97 8,621.97 6,502.73 3,880.15 89.05 271.22 8,683.50 8,622.50 6,502.14 3,849.84 88.99 275.71 8,684.01 8,623.01 6,503.95 3,820.02 87.85 280.44 8,684.84 8,623.84 6,508.17 3,790.26 86.22 284.95 8,686.39 8,625.39 6,514.74 3,761.08 85.42 289.68 8,688.59 8,627.59 6,523.68 3,732.42 84.50 294.21 8,691.19 8,630.19 6,534.70 3,705.05 85.64 295.86 8,693.76 8,632.76 6,547.28 3,678.11 85.60 292.31 8,696.06 8,635.06 6,559.58 3,650.60 84.94 288.79 8,698.98 8,637.98 6,571.96 3,617.58 84.13 286.41 8,701.30 8,640.30 6,579.27 3,594.53 85.72 281.55 8,706.18 8,645.18 6,592.54 3,541.23 85.94 278.04 8,708.39 8,647.39 6,597.70 3,511.32 84.62 276.44 8,710.81 8,649.81 6,601.39 3,482.29 86.59 273.49 8,713.11 8,652.11 6,603.98 3,452.44 87.39 269.54 8,714.65 8,653.65 6,604.75 3,423.24 89.17 265.79 8,715.59 8,654.59 6,603.48 3,392.03 89.08 261.78 8,716.06 8,655.06 6,600.14 3,361.36 Well 15-16 15-16B @ 61.00usft (Nabors 7ES) 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Northing Easting DLeg V. Sec (usft) (usft) (°/100usft) (usft) 5,967,322.710 680,072.228 17.45 7,543.68 5,967,307.347 680,046.596 10.78 7,521.71 5,967,290.289 680,020.038 7.99 7,497.87 5,967,275.622 679,995.664 13.71 7,476.93 5,967,262.526 679,970.201 13.19 7,457.19 5,967,250.342 679,940.564 18.75 7,437.15 5,967,240.023 679,907.749 13.47 7,418.00 5,967,232.417 679,878.671 6.39 7,402.51 5,967,226.465 679,849.411 15.17 7,388.56 5,967,222.191 679,814.666 13.09 7,374.67 5,967,220.897 679,784.378 15.33 7,364.901 5,967,222.003 679,754.523 15.02 7,357.55 I 5,967,225.526 679,724.672 16.17 7,352.52 5,967,231.413 679,695.348 15.99 7,349.91 5,967,239.673 679,666.488 15.89 7,349.70 5,967,250.051 679,638.878 15.55 7,351.89 5,967,262.000 679,611.649 6.70 7,355.68 5,967,273.650 679,583.857 11.71 7,359.03 5,967,285.251 679,550.558 10.09 7,360.78 5,967,292.019 679,527.349 10.31 7,360.74 5,967,304.032 679,473.757 9.24 7,357.17 5,967,308.493 679,443.734 11.52 7,353.00 5,967,311.501 679,414.622 7.05 7,347.68 5,967,313.392 679,384.727 11.78 7,341.07 5,967,313.480 679,355.516 13.76 7,332.93 5,967,311.476 679,324.353 13.28 7,322.23 5,967,307.418 679,293.763 12.99 7,309.72 1/3/2017 4:24.19PM Page 11 COMPASS 5000.1 Build 81B `00% N�1` p BP - Final Survey Report BAK R•• HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay Site: PB DS 15 TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16C Survey Calculation Method: Minimum Curvature Design: 15-16C - - - Database: EDM R5K-Alaska PROD -ANCP1 Survey - - - - - - - - MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 14,840.88 91.72 261.11 8,715.86 8,654.86 6,595.81 3,332.58 5,967,302.417 679,265.101 9.36 7,296.85 14,877.98 90.92 257.70 8,715.00 8,654.00 6,588.99 3,296.13 5,967,294.746 679,228.821 9.44 7,279.26 14,901.18 90.15 254.13 8,714.79 8,653.79 6,583.35 3,273.63 5,967,288.576 679,206.463 15.74 7,267.05 14,931.75 90.49 249.62 8,714.62 8,653.62 6,573.84 3,244.59 5,967,278.391 679,177.651 14.79 7,249.16 14,960.64 90.61 247.27 8,714.34 8,653.34 6,563.23 3,217.72 5,967,267.153 679,151.042 8.14 7,230.88 14,991.38 89.97 250.69 8,714.18 8,653.18 6,552.20 3,189.03 5,967,255.460 679,122.621 11.32 7,211.651 15,027.88 88.56 256.20 8,714.65 8,653.65 6,541.81 3,154.06 5,967,244.249 679,087.906 15.56 7,191.11 15,055.91 86.37 256.65 8,715.89 8,654.89 6,535.24 3,126.84 5,967,237.041 679,060.851 7.98 7,176.58 15,080.69 87.67 260.80 8,717.18 8,656.18 6,530.40 3,102.58 5,967,231.637 679,036.710 17.53 7,164.59 15.16C TIP to 15-16CPB2 15,100.00 87.51 264.30 8,717.99 8,656.99 6,527.90 3,083.45 5,967,228.688 679,017.648 18.11 7,156.39 1 15-16C KOP - Billet 15,129.38 94.67 266.03 8,717.43 8,656.43 6,525.42 3,054.20 5,967,225.528 678,988.466 25.07 7,145.14 15,159.71 90.58 268.23 8,716.04 8,655.04 6,523.91 3,023.95 5,967,223.304 678,958.260 15.31 7,134.50 15,190.51 91.66 271.39 8,715.44 8,654.44 6,523.80 2,993.16 5,967,222.480 678,927.483 10.84 7,125.04 15,225.67 91.90 275.99 8,714.35 8,653.35 6,526.06 2,958.10 5,967,223.919 678,892.381 13.09 7,116.53 15,250.73 92.83 280.04 8,713.31 8,652.31 6,529.56 2,933.31 5,967,226.827 678,867.519 16.57 7,112.32 15,280.49 94.55 285.17 8,711.40 8,650.40 6,536.03 2,904.34 5,967,232.624 678,838.405 18.15 7,109.68 15,310.47 93.17 289.10 8,709.38 8,648.38 6,544.84 2,875.76 5,967,240.763 678,809.631 13.87 7,109.38 15,335.89 91.26 288.10 8,708.40 8,647.40 6,552.95 2,851.69 5,967,248.297 678,785.376 8.48 7,109.78 15,366.06 87.98 284.14 8,708.60 8,647.60 6,561.32 2,822.72 5,967,255.989 678,756.216 17.04 7,108.95 15,395.33 89.97 280.87 8,709.12 8,648.12 6,567.65 2,794.15 5,967,261.653 678,727.512 13.08 7,106.30 15,425.65 90.80 277.27 8,708.92 8,647.92 6,572.43 2,764.22 5,967,265.729 678,697.475 12.18 7,101.75 15,454.63 90.95 273.96 8,708.47 8,647.47 6,575.27 2,735.38 5,967,267.887 678,668.585 11.43 7,095.68 15,485.69 91.04 271.84 8,707.93 8,646.93 6,576.84 2,704.37 5,967,268.731 678,637.545 6.83 7,087.75 15,521.45 89.05 268.95 8,707.91 8,646.91 6,577.09 2,668.62 5,967,268.140 678,601.798 9.81 7,077.11 15,554.57 89.42 266.11 8,708.35 8,647.35 6,575.66 2,635.53 5,967,265.938 678,568.759 8.65 7,065.69 1/3/2017 4:24:19PM Page 12 COMPASS 5000.1 Build 818 2.'' BP - p •• 4 Final Survey Report BAKE HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well 15-16 Project: Prudhoe Bay Site: PB DS 15 TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) North Reference: True Wellbore: 15-16C Survey Calculation Method: Minimum Curvature Design: 15-16C Database: EDM R5K-Alaska PROD -ANCP1 Survey - - - - - - - - MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 15,595.71 90.18 260.90 8,708.49 8,647.49 6,571.01 2,594.67 5,967,260.330 678,528.021 12.80 7,048.83 1 15,626.63 89.48 258.22 8,708.56 8,647.58 6,565.40 2,564.27 5,967,254.018 678,497.758 8.96 7,034.25 15,655.70 92.40 256.78 8,708.11 8,647.11 6,559.11 2,535.89 5,967,247.065 678,469.541 11.20 7,019.63 15,690.41 91.75 253.99 8,706.85 8,645.85 6,550.36 2,502.33 5,967,237.530 678,436.196 8.25 7,001.09 15,715.89 91.94 251.27 8,706.03 8,645.03 6,542.76 2,478.03 5,967,229.361 678,412.080 10.70 6,986.46 I 15,745.08 90.18 247.09 8,705.49 8,644.49 6,532.39 2,450.76 5,967,218.354 678,385.060 15.53 6,968.28 15,770.86 89.97 243.76 8,705.46 8,644.46 6,521.67 2,427.32 5,967,207.089 678,361.877 12.94 6,950.94 li 15,798.41 91.66 242.25 8,705.06 8,644.06 6,509.17 2,402.77 5,967,194.015 678,337.634 8.23 6,931.57 15,830.51 89.36 246.03 8,704.78 8,643.78 6,495.17 2,373.89 5,967,179.346 678,309.095 13.78 6,909.45 15,858.23 88.43 249.49 8,705.31 8,644.31 6,484.68 2,346.24 5,967,168.261 678,283.700 12.92 6,891.66 15,888.92 89.82 253.98 8,705.78 8,644.78 6,475.07 2,319.11 5,967,157.967 678,254.803 15.31 6,873.64 15,917.63 90.37 258.01 8,705.73 8,644.73 6,468.12 2,291.26 5,967,150.370 678,227.125 14.17 6,858.56 15,948.93 91.57 261.32 8,705.20 8,644.20 6,462.51 2,260.48 5,967,144.037 678,196.484 11.25 6,843.85 15,979.53 94.36 264.95 8,703.62 8,642.62 6,458.85 2,230.15 5,967,139.674 678,166.248 14.95 6,831.15 16,009.19 95.39 269.73 8,701.10 8,640.10 6,457.48 2,200.64 5,967,137.611 678,136.779 16.43 6,820.87 16,039.53 95.93 275.10 8,698.10 8,637.10 6,458.75 2,170.48 5,967,138.175 678,106.605 17.70 6,812.91 16,071.93 95.99 280.10 8,694.74 8,633.74 6,463.01 2,138.55 5,967,141.686 678,074.585 15.35 6,807.26 16,097.00 95.99 280.10 8,692.12 8,631.12 6,467.39 2,114.00 5,967,145.482 678,049.944 0.00 6,803.96 2 7/8" 16,145.00 95.99 280.10 8,687.11 8,626.11 6,475.76 2,067.01 5,967,152.750 678,002.765 0.00 6,797.64 Projection to TD Casing Points - - - -- Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 16,145.00 8,687.11 27/8" - - - 2.785 4.250 - 1/3/2017 4.24.19PM Page 13 COMPASS 5000.1 Build 81B 00 by Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Well 15-16 Wellbore: 15-16C 15-16B @ 61.00usft (Nabors 7ES) Design: 15-16C 15-16B @ 61.00usft (Nabors 7ES) Design Annotations North Reference: True Measured Vertical Minimum Curvature Depth Depth EDM R5K - Alaska PROD - ANCP1 (usft) (usft) 15,080.69 8,717.18 15,100.00 8,717.99 16,145.00 8,687.11 BP I/.aI Final Survey Report BAKER HUGHES Local Co-ordinate Reference: Well 15-16 ND Reference: 15-16B @ 61.00usft (Nabors 7ES) MD Reference: 15-16B @ 61.00usft (Nabors 7ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Local Coordinates +N/ -S +E/ -W (usft) (usft) Comment 6,530.40 3,102.58 15-16C TIP to 15-16CPB2 6,527.90 3,083.45 15-16C KOP - Billet 6,475.76 2,067.01 Projection to TD Prepared By: Yosha Ragbirsingh Survey Manager, Baker Hughes 1/3/2017 4:24:19PM Page 14 COMPASS 5000.1 Build 818 Project: PrudhoeBay nzinWiamr •N°'WELLBOREDETAIL5: 75-16C REFERENDEIWORM4TION Nt�TnaaNann:le.u• .. Site: PBDSi6 caoranae Well: 15-16 rrow�acFbb 15-16C (WE)Remrence: wep tsa6, True Nam - so-agn:s7s,75� Vedice(ND)Raterence: 75-168�61.00usftlNe0ors7E5) BAKER 0 bp' Wellbore: ib16C DiaAnpb:ef.ex Section ll/S)Relerence'. gat-IO.00N. O.00E) Design: ibl6C(ib1611b16C) titd�ec'r�.voi Parent We6bore: 15-16CP82 Measured Oeam Rererence: iS1fi8@61.00usR (Nffiors 7E5) Tie on MD: 15060.69 Osculation Whod: I6nimam C—t- HUGHES Post Drilling Easting (400 usft/in) m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m V V J j j V V N J J J V V J V V V V J V V V V m m m m W W m m O O O N N W W A A A N N m m m V V W m m lD N O O O N N N O A m N m O A m N m O A m N m O A m O O N m O A m N m O W N m O A m O O O O O O O O O O O O O O O O OA O O O O O O O O O O O O O O O O O O O O O O O O .._._ OO O O O 0 8400 5IT5-18 /15-21A1 15-211 2-1/1-- 5968000 1-_�5-25 16- 6 67600 15 46 1_ -1359L1-13�--1-i6/1-16CP82 O O O ---- �"-� 5967200 5-46/15-46L1PB1 15-27/15-27APB1 15-1 /15-16C 15-16/15-16BP T _ 15-21 5-21 15-16/15-16CPB1 5966800 �I --- - - - � B 1 15-46/15 46L1 e�0 15 36/15 36A 15-36/15-36AP81 5-36/15--3368 B1 15-41/15-41A 0 5-36/15- 1_36/15-366PB2 5966400 - -.8000 5966000 - �Op - gOd� - - - :...� 4 5965600 p,0 7000 15-37/15-37C �O 15 1516 15.36/15-368 15 45115-45P -41�� (�15-418PB1 T5-17/15-17 5965200 -33115-33A- 15-33/15- d9 0', 15 0 B 0 15- 15- / 15- 59648 00] X37/15 7A m 15-33/15-33C �� 7/15= 7 15-45/ 4&D p III L 4 DP 1 0 8 6 0 15 - 5964400--' - 45/ - 0 15-37/1 -37B 0 5 - I _ B� 0 c 15-33/15-33B 0. � 0 � O I- —. gg 16A 5963600 15-05/15-056 15-05/15 O�BP i O 1 -4 15 6000 >000 511 6 5 op O r 15-16/15 5964000 60 1 r - O 15 30 15- A 06 0 s 5 O - 9 191 -1A B s 5 00 Z 5963200 0 9/ 5-4 B 5962600 _. - - _ 5� _ _ 1. - t#11. - 0 p0 60 o0 5 O SB O... I. _\jJ 15- --r 5962400 -- - -r o APB 1 0.. : I - ,., ,7-- 5962000 T� O p� - - 0 QO.. 0 _ ---+ I -4- 15-26A I .. B a 0 t—= ._ _ 5961600 15-04/15- 4A15-26/'/1 40 O i 15 49/15-49APB1 5-26 ®00 -- 1519/15,49A : - T 5961200- _ _ _ p 15-26/1 -'- _ _ 49/15}49PB1-,- 5960800 o o�}49115 49 15:48/15-48 10 4/15 AB 15-04/15- 04/15 - 15 04BPB - 5960400 5960000 _ 1 5-0411 5-04P82 - 0�mV1., - J . -�mV mV 4 rn ; - 'lpT � m fom mm + 15-04! 5 04PB1 0 - - i- 15-43 15 43/m15.49/15 -49C m omw O �m m m m m .. O A m N m O A m N m O A Oma N N OA m N m O A m N O A O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O i -16B 9 61.00usft (Nabors 7ES) Easting (400 usfthn) AOGCC OFFSET REPORT C by North America - ALASKA - BP Prudhoe Bay PB DS 15 15-16 15-16C 15-16C AOGCC Post Drilling Offset Report 04 January, 2017 FeAA ' &"-- 2 BAKER HUGHES AOO GCC OFFSETW M MENT b ri.2 SBP y p Anticollision Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 15 Site Error: 0.00usft Reference Well: 15-16 Well Error: 0.00usft Reference Wellbore 15-16C Reference Design: 15-16C Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 15-16 15-16B @ 61.00usft (Nabors 7ES) 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 15-16C Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 1/4/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 90.00 4,540.00 15-16 Srvy 2 GYD CT CMS (15-16) GYD-CT-CMS Gyrodata cont.casing m/s 4,587.00 4,604.00 15-16BPB1 Srvy 1 Blind (15-166PB1) BLIND Blind drilling 4,626.54 4,720.47 15-168PB1 Srvy 2 Inc+Trend (15-16BPB1 INC+TREND Inclinometer+ known azi trend 4,813.93 12,335.13 15-16BPB1 Srvy 3 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 12,409.41 12,912.00 15-16BPB1 Srvy 4 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 12,938.02 13,281.94 15-16B Srvy 1 MWD+IFR+MS (15-166) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 13,289.50 15,080.69 15-16CPB2 CTK MWD 4-1/4" (15-16CPB MWD MWD - Standard 15,100.00 16,071.93 15-16C CTK MWD 4-1/4" (15-16C) MWD MWD - Standard 1/4/2017 12:33.38PM A ' CC 0 F FEET 'F-1 VI E ILI/O RT COMPASS 5000.1 Build 818 e* BP Z byh Anticollision Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay ND Reference: 15-16B @ 61.00usft (Nabors 7ES) Reference Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site Error: 0.00usft North Reference: True Reference Well: 15-16 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 15-16C Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: 15-16C Offset ND Reference: Offset Datum ri.9 BAKER HUGHES Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design 9 (usft) (usft) (usft) (usft) Lis DS 01 L1-13 - L1-13 - L1-13 14,785.81 17,216.00 274.18 294.83 55.16 Pass - Major Risk PB DS 15 15-03 - 15-03 - 15-03 2,567.23 2,575.00 464.11 40.68 423.43 Pass - Major Risk 15-04 - 15-04 - 15-04 2,478.62 2,475.00 360.86 34.01 326.86 Pass - Major Risk 15-04 - 15-04A - 15-04A 2,478.62 2,475.00 360.86 34.01 326.86 Pass - Major Risk 15-04 - 15-04B - 15-04B 2,478.62 2,475.00 360.86 34.01 326.86 Pass - Major Risk 15-04 - 15-04BPB1 - 15-04BPB1 2,478.62 2,475.00 360.86 34.01 326.86 Pass - Major Risk 15-04- 15-04PB1 - 15-04PB1 2,478.62 2,475.00 360.86 34.01 326.86 Pass - Major Risk 15-04 - 15-04PB2 - 15-04PB2 2,478.62 2,475.00 360.86 34.01 326.86 Pass - Major Risk 15-05 - 15-05 - 15-05 2,523.63 2,525.00 231.95 34.08 197.88 Pass - Major Risk 15-05 - 15-05A- 15-05A 2,523.63 2,525.00 231.95 34.08 197.88 Pass - Major Risk 15-05 - 15-05APB1 - 15-05APB1 2,523.63 2,525.00 231.95 34.08 197.88 Pass - Major Risk 15-05 - 15-05B - 15-05B 2,523.63 2,525.00 231.95 34.23 197.72 Pass - Major Risk 15-05 - 15-05BPB1 - 15-05BPB1 2,523.63 2,525.00 231.95 34.08 197.88 Pass - Major Risk 15-06 - 15-06 - 15-06 2,571.54 2,575.00 107.04 42.31 64.73 Pass - Major Risk 15-06 - 15-06A - 15-06A 2,571.54 2,575.00 107.04 42.31 64.73 Pass - Major Risk 15-06 - 15-06APB1 - 15-06APB1 2,571.54 2,575.00 107.04 42.31 64.73 Pass - Major Risk 15-16 - 15-16 - 15-16 4,861.67 4,875.00 32.74 133.30 -98.00 FAIL- Major Risk 15-16 - 15-16A- 15-16A 4,861.67 4,875.00 32.74 133.30 -98.00 FAIL- Major Risk 15-16 - 15-16B - 15-16B 13,591.80 13,650.00 105.09 6.82 99.58 Pass - Major Risk 15-16 - 15-16BPB1 - 15-16BPB1 Out of range 15-16 - 15-16CPB1 - 15-16CPB1 13,600.00 13,600.00 0.00 6.29 -6.11 FAIL - Major Risk 15-16- 15-16CPB2 - 15-16CPB2 15,392.57 15,400.00 59.69 14.27 46.14 Pass - Major Risk 15-17 - 15-17 - 15-17 3,034.84 3,025.00 130.76 44.21 86.72 Pass - Major Risk 15-18 - 15-18 - 15-18 467.13 475.00 243.54 30.73 212.82 Pass - Major Risk 15-18 - 15-18A - 15-18A 467.13 475.00 243.54 30.73 212.82 Pass - Major Risk 15-19 - 15-19 - 15-19 3,805.35 3,775.00 213.68 51.81 161.86 Pass - Major Risk 15-19- 15-19A - 15-19A 3,805.35 3,775.00 213.68 51.81 161.86 Pass - Major Risk 15-21 - 15-21 - 15-21 943.68 950.00 485.53 14.98 470.55 Pass - Major Risk 15-21 - 15-21 A - 15-21 A 950.88 950.00 485.59 15.05 470.54 Pass - Major Risk 15-26- 15-26 - 15-26 2,542.20 2,550.00 145.77 34.51 111.31 Pass - Major Risk 15-26 - 15-26A - 15-26A 2,542.20 2,550.00 145.77 34.67 111.15 Pass - Major Risk 15-26- 15-266 - 15-26B 2,548.58 2,550.00 145.85 34.74 111.16 Pass - Major Risk 15-27 - 15-27 - 15-27 4,087.05 4,025.00 309.33 45.75 264.30 Pass - Major Risk 15-27- 15-27A - 15-27A 4,090.84 4,025.00 306.92 45.95 261.41 Pass - Major Risk 15-27- 15-27APB1 - 15-27APB1 4,090.84 4,025.00 306.92 45.95 261.41 Pass - Major Risk 15-33 - 15-33 - 15-33 1,041.02 1,050.00 309.19 14.63 294.56 Pass - Major Risk 15-33- 15-33A - 15-33A 1,041.02 1,050.00 309.19 14.63 294.56 Pass - Major Risk 15-33- 15-33B - 15-33B 1,041.02 1,050.00 309.19 14.63 294.56 Pass- Major Risk 15-33- 15-33C - 15-33C 1,041.02 1,050.00 309.19 14.63 294.56 Pass - Major Risk 15-33 - 15-33PB1 - 15-33PB1 1,041.02 1,050.00 309.19 14.63 294.56 Pass - Major Risk 15-33- 15-33PB2 - 15-33PB2 1,041.02 1,050.00 309.19 14.63 294.56 Pass - Major Risk 15-36 - 15-36 - 15-36 8,370.75 7,800.00 222.27 262.36 -24.07 FAIL- Major Risk 15-36 - 15-36A - 15-36A 8,370.75 7,800.00 222.27 262.36 -24.07 FAIL - Major Risk 15-36 - 15-36APB1 - 15-36APB1 8,370.75 7,800.00 222.27 262.36 -24.07 FAIL - Major Risk 15-36 - 15-36B - 15-36B 8,371.84 7,800.00 222.43 262.41 -24.09 FAIL - Major Risk 15-36- 15-36BPB1 - 15-36BPB1 8,371.84 7,800.00 222.43 262.38 -24.06 FAIL - Major Risk 15-36 - 15-36BPB2 - 15-36BPB2 8,371.84 7,800.00 222.43 262.41 -24.09 FAIL - Major Risk 15-37 - 15-37 - 15-37 7,044.48 6,600.00 228.60 246.88 0.76 Pass - Major Risk 15-37 - 15-37A - 15-37A 7,044.48 6,600.00 228.60 246.78 0.58 Pass - Major Risk 15-37 - 15-37APB1 - 15-37APB1 7,044.48 6,600.00 228.60 246.78 0.58 Pass - Major Risk 15-37 - 15-37B - 15-37B 6,531.96 6,150.00 227.18 208.30 36.54 Pass - Major Risk 11412017 12:33/L� 0 c,l( -(� - O�I�q�i�� ��Iv)��� COMPASS 5000.1Build 81B BP Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Reference Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site Error: 0.00usft North Reference: True Reference Well: 15-16 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 15-16C Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: 15-16C Offset TVD Reference: Offset Datum riam BAKER HUGHES Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design 9 (usft) (usft) (usft) (usft) PB DS 15 15-37 - 15-37C - 15-37C 6,531.96 6,150.00 227.18 208.30 36.54 Pass - Major Risk 15-41 - 15-41 - 15-41 3,208.30 3,350.00 328.07 77.02 251.86 Pass - Major Risk 15-41 - 15-41A- 15-41A 3,208.30 3,350.00 328.07 77.11 251.77 Pass - Major Risk 15-41 - 15-41 B - 15-41 B 3,208.30 3,350.00 328.07 77.11 251.78 Pass - Major Risk 15-41 - 15-41 BPB1 - 15-41 BPB1 3,208.30 3,350.00 328.07 77.11 251.78 Pass - Major Risk 15-43 - 15-43 - 15-43 3,614.28 3,625.00 155.77 45.34 110.52 Pass - Major Risk 15-44 - 15-44 - 15-44 515.68 525.00 313.81 8.72 305.13 Pass - Major Risk 15-45 - 15-45 - 15-45 490.35 500.00 334.79 7.89 326.90 Pass - Major Risk 15-45 - 15-45A - 15-45A 490.35 500.00 334.79 7.89 326.90 Pass - Major Risk 15-45 - 15-45APB1 - 15-45APB1 490.35 500.00 334.79 8.05 326.75 Pass - Major Risk 15-45 - 15-45APB2 - 15-45APB2 490.35 500.00 334.79 7.89 326.90 Pass - Major Risk 15-45 - 15-45B - 15-45B 490.35 500.00 334.79 7.89 326.90 Pass - Major Risk 15-45 - 15-45BPB1 - 15-45BPB1 490.35 500.00 334.79 8.05 326.75 Pass - Major Risk 15-45 - 15-45C - 15-45C 490.35 500.00 334.79 7.89 326.90 Pass - Major Risk 15-45 - 15-45CP61 - 15-45CPB1 490.35 500.00 334.79 7.89 326.90 Pass - Major Risk 15-45 - 15-45D - 15-45D 490.35 500.00 334.79 7.89 326.90 Pass - Major Risk 15-45 - 15-45DPB1 - 15-45DPB1 490.35 500.00 334.79 7.89 326.90 Pass - Major Risk 15-45 - 15-45PB1 - 15-45PB1 490.35 500.00 334.79 8.05 326.75 Pass - Major Risk 15-46 - 15-46 - 15-46 564.91 575.00 347.98 9.44 338.54 Pass - Major Risk 15-46 - 15-461-1 - 15-461-1 564.91 575.00 347.98 9.44 338.54 Pass - Major Risk 15-46 - 15-461-1 PB1 - 15-461-1 PB1 564.91 575.00 347.98 9.44 338.54 Pass - Major Risk 15-48 - 15-48 - 15-48 2,473.92 2,475.00 444.07 33.83 410.25 Pass - Major Risk 15-48 - 15-48A - 15-48A 2,473.92 2,475.00 444.07 33.84 410.25 Pass - Major Risk 15-48 - 15-48B - 15-48B 2,473.92 2,475.00 444.07 33.84 410.25 Pass - Major Risk 15-48 - 15-48C - 15-48C 2,473.92 2,475.00 444.07 33.86 410.23 Pass - Major Risk 15-49 - 15-49 - 15-49 316.89 325.00 255.98 5.63 250.36 Pass - Major Risk 15-49 - 15-49A - 15-49A 316.89 325.00 255.98 5.63 250.36 Pass - Major Risk 15-49 - 15-49APB1 - 15-49APB1 316.89 325.00 255.98 5.63 250.36 Pass - Major Risk 15-49 - 15-49B - 15-49B 316.89 325.00 255.98 5.63 250.36 Pass - Major Risk 15-49 - 15-49C - 15-49C 316.89 325.00 255.98 5.17 250.82 Pass - Major Risk 15-49 - 15-49PB1 - 15-49PB1 316.89 325.00 255.98 5.63 250.36 Pass - Major Risk 1/4/2017 12:33.38PM/1-1\ O (f �, j► _ C OFFS_ F FS T REPORT EPORT COMPASS 5000.1 Build 818 .%140' bBP rel,2 'NyN sion Report BAKER AnticolliHUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 15 Site Error: 0.00usft Reference Well: 15-16 Well Error: 0.00usft Reference Wellbore 15-16C Reference Design: 15-16C Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 15-16 15-16B @ 61.00usft (Nabors 7ES) 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to 15-16B @ 61.00usft (Nabors 7ES) Coordinates are relative to: 15-16 offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK ventral Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 1.34° Ladder Plot 600- -7-- -1- - - - - --- - --- - ---' - - - -� I I ,- 1 ' I ---------- J - - - - - !-------- ------'--- ----- ----------'--- -I 1 - - -- - c j , 450 - - - -- - - -- --' -- - - - -- - _o I I , _ _I -- - -'-- ---1- -- ---- g ---I- - - -- - -1-- I I I I - M CL (n 300- Q) 00 - I I I _ _ _ - _ _ __I_ _ - _ _ _ _ _ - J_ _ _ _ _ _ - ._ - - O m 150 - ----- --- ..--- LEGEND -- -- - U _ 1-11�,L1-13,1-1-13VO $ 15-21'„15_21A,15-21AV7 - - 1 3, 5 3,1543: 1 15-03,15-03,15-03 V1 -- 15-26,15-26,15-26 V1 -0-15 ' 5-44,15-44 1 15-014,15-04,15-04 V5 i $ 15 -26,15 -26A,15 -26A V3 15 5 5,15-45 1 0 -45A 155AVS &W 15-04,15-04%66d4B V14 66* 15-27,15-27, #0�bV3 1 I 15-45,15-45Aqb' &45APB1 V3 - - 15-04,15-04BPB1,15-04BPB1 V1 1$ $ 00 15e2&�j ff 5 27 �/p00 US n��- 15-45,15-45APB2,15-45APB2 V4 11V51-27,15-27APB $ 15-04,15-04PB1,15-04PB1 V5 $ ,L1115-:i7UAP131 VO -#- 15-45,15-456,15-45B V8 $ 15-05,15-05,15-05V5 $ 15 -33,15 -33A,15 -33A V2 $ 15 -45,15 -45C,15 -45C V0 -b- 15 -05,15 -05A,15 -05A V2 $ 15 -33,15 -33B,15 -33B V2 15-45,15-45CPB1,15-45CP131 VO $ 15-05,15-05APB1,15-05APB1 V2 $ 15 -33,15 -33C,15 -33C VO $ 15 -45,15 -45D,15 -45D V0 $ 15-05,15-058,15-05BV0 15-33,15-33PB1,15-33PB1 V1 $ 15-45,15-45DPB1,15-45DPB1 V0 15-05,15-05BPB1,15-05BPB1 VO 15-33,15-33PB2,15-33PB2V1 15-45,15-45PB1,15-45PB1 V2 �- 15-06,15-06,15-06V1 $ 15-36,15-36,15-36 V1 15-46,15-46,15-46 V 1 �F 15 -06,15 -06A,15 -06A V4 15 -36,15 -36A,15 -36A V2 $ 15-46,15-461-1,15-461-1 V2 $ 15-06,15-06APB1,15-06APB1 V2 $ 15-36,15-36AP61,15-36AP61 V3 15-46,15-4611PB1, 15-4611 PBI V1 15-16,15-16,15-16V5 $ 15 -36,15 -36B,15 -36B V7 15-48,15-48,15-48 V1 $ 15-16,15-16A, 15-16A V3 15-36 15-36BPB1 15-36BPB1 V8 -0- 15-48,15-48A, 15-48A V2 11412017 12:33.38PM/[�\ O(1 CC O F Ib.. SET RV' E JO R�( COMPASS 5000,1 Build 818 rnrnCu u[o/zu I / 9:2b:28AM North America -ALASKA - BP Page 1 of 2 Cementing Report Common Well Name: 15-16 / 06 - - --- --- - -- Project Prudhoe Bay Site: PB DS 15 Report no.: 1 Report date: 12/29/2016 Event Type: COM- ONSHORE (CON) -- _ Spud Date/Time: 6/6/1984 Start Date: 12/28/2016 End Date: 1/1/2017 AFE No. Contractor: NORDIC CALISTA Rig Name/No.: NORDIC 2 Rig Release: 1/1/2017 X3 -0186W -C: (1,143,907.00) BPUO1: Active datum: 15-16-B @61.00usft (above Mean Sea Level) General Information Job type: Primary Cement job start date/time: 12/29/2016 6:30PM Job end date/time: 12/29/2016 9:OOPM Cement Company: SCHLUMBERGER Cementer: JARED WALLACE/CHARLES Cemented String: PRODUCTION LINER 1 String Size: 2.875 (in) HACKER String Set TMD: 16,145.00 (usft) Hole Size: 4.250 (in) Pipe Movement Pipe Movement: NO MOVEMENT Rotating Time (Start -End): RPM: Rotating Torque (init/avg/max): (ft-Ibf) Reciprocating Time (Start -End): Recip Drag Up/Down: - (kip) SPM: Stroke Length: Fluid Name: CEMENT Fluids (1 of 1) Slurry Type: CEMENT Purpose: PRIMARY Class: G -CLASS Description: TAIL SLURRY Density: 15.30 (ppg) Yield: 1.3200 (ft'/sk) Mix Water Ratio: 6.143 (gal/sk94) Excess: Mix Method: BATCH Sacks Used: 157.50 (941b sacks) Water Volume: 23.0 (bbl) Excess Slurry Volume: Density Measured by: DENSOMETER Other Volume: Total Vol in Well: 33.7 (bbl) Slurry Volume: 37.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 9.00 (ppg) PV: 6.00 (cp) YP: 29.000 (Ibf/100ft2) Viscosity: 46.00 (s/qt) Gels 10 Sec: 17.000 (Ibf/100W) Gels 10 Min: 21.000 (Ibf/100W) Additives Name Type Amount Units Concentration Unit D047 ANTIFOAM AGENT GAL/SX D065 DISPERSANT 0.200 D167 1.000 % BWOC D600 G FLUID LOSS GAS -BLOCK 0.100 % BWOC D163 1.500 GAL/BBL CEMENT 6.000 % BWOC Fluid Tests Thick time (hr) Thick temp. Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength ('F) (%) temp. (cc/30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 ('F) (°F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) ('F) 4.42 0.00 80.00 34.0 171.00 1,000.00 (min) (psi) (°F) (min) rnrnCu u[o/zu I / 9:2b:28AM Printed 1/25/2017 9:25:28AM North America - ALASKA - BP Page 2 of 2 Cementing Report Common Well Name: 15-16 / 06-12-/-29—/2016-- - -- -- ---- - - -- - - — Project: Pro ect: Prudhoe Ba I y Site: PB DS 15 _ p- Re ort no 1 P Reportdate: 12/29/2016 _ _-- Event Type: COM- ONSHORE (CON) Spud Date/Time: 6/6/1984 Start Date: 12/28/2016 End Date: 1/1/2017 AFE No.: Contractor: NORDIC CALISTA Rig Name/No.: NORDIC 2 Rig Release: 1/1/2017 X3 -0186W -C: (1,143,907,00) BPUOI:— - 'Active datum: 15-168 @61.00usft (above Mean Sea Level) - - Stages Stage Stage Type Est. Top Est. Bottom Mud Circ. I Mud Circ. Top Bottom Plug Pressure Float Pressure Returns Circulate Cmt Vol to Total Annular no. (usft) (usft) Rate Press. Plug Plug Bumped Bumped Held Held Prior Surface Mud Lost Flow (gpm) (psi) (psi) (min) (hr) (bbl) (bbl) After 1 PRIMARY CEMENT 12,801.00 16,145.00 y y Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumped Disp. Rate TMD TMD Pmp date/time job Used temp. temp. (bbl) Rate (bbl/min) (usft) (usft) (bbl/min) (scf) Tests Casing Test Shoe Test Liner Top Test Test Pressure: (psi) FIT/LOT: (ppg) Liner Overlap: (usft) Time: (min) Tool: N Positive Test: (ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Hrs Prior to Log: (hr) How Determined: Printed 1/25/2017 9:25:28AM rIC.s BAKER HUGHES WELL NAME RECEIV70 JAN 12 2017 PRINT DISTRIBUTION LIST COMPANY I i t11% aska Inc 15-16C FIELD Prudhoe Bay Unit COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider@bakerhughes.com STATUS Final Replacement COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BO$ PERSON ATTENTION 216154 2791 1 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1-112-1 DATA LOGGED 900 E. Benson Blvd. \ t'j M K.. BEN Anchorage, Alaska 99508 to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE December 28, 2016 TODAYS DATE January 11, 2017 Revision No Details: Requested by: FIELD FINAL CD CD LOGS LOGS (digital/image) Surveys (Final Surveys) I#OFCOPIE] # OF PRINTS # OF NKIN I S # OF COPIES # OF COPIES 1 BP North Slope 6 EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. (Anchorage, Alaska 99508 2 �ConocoPhillips Alaska Inc. Attn: Ricky F,Igaricio PO Box 100360 AK 99510 3 �ExxonMobil,Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4, State of Alaska - AOGCC Attn: Makana Bender 1333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5, DNR - Division of Oil & G Attn: Resource Evaluation 550 West 7th Avenue, Suit Anchorage, Alaska 99501 I x** Stamp "confidential' on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1,112-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: Behrooz Raessi TOTALS FOR THIS PAGE: 0 2 4 4 0 0 TOTALS FOR ALL PAGES: 0 2 4 4 0 0 RFCEIIVEn JAN ' L 2017 AOGCC North America - ALASKA - BP Prudhoe Bay PB DS 15 15-16 15-16C 500292111503 Design: 15-16C Final Survey Report 03 January, 2017 215154 2791 1 BAKER HUGHES Site PB DS 15, TR -11-14 Depth From (TVD) +N/ -S I/hs (usft) Site Position: From: Position Uncertainty: BP Northing: Easting: Slot Radius: 5,958,837.360 usft 676,296.980 usft 0.000 in Latitude: Longitude: Grid Convergence: 70° 17'35.236 N 148° 34' W 1.34 1.34 ° BAKER Obp Final Survey Report Well HES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 15-166 @ 61.00usft (Nabors 7ES) Well Position Position Uncertainty Project: Prudhoe Bay TVD Reference: MD Reference: 15-16B @ 61.00usft (Nabors 7ES) 70° 17' 52.919 N 148° 34'26.072 W 33.16 usft Site: Pr DS 15 PBD North Reference: True Well: Wellbore Survey Calculation Method: Minimum Curvature Wellbore: 15-16C Database: EDM R5K - Alaska PROD - ANCP1 Declination (°) Design: 15-16C BGGM2016 1/112017 18.14 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Using Well Reference Point Geo Datum: NAD27 * OGP-UsaAK [4267*158641 Using geodetic scale factor Mao Zone: NAD27 * OGP-Usa AK / Alaska zone 4 [26734*1586, Site PB DS 15, TR -11-14 Depth From (TVD) +N/ -S (usft) (usft) Site Position: From: Position Uncertainty: Map 0.00 usft Northing: Easting: Slot Radius: 5,958,837.360 usft 676,296.980 usft 0.000 in Latitude: Longitude: Grid Convergence: 70° 17'35.236 N 148° 34' W 1.34 1.34 ° Well 15-16, 15-16 Well Position Position Uncertainty +N/ -S 0.00 usft +E/ -W 0.00 usft 0.00 usft Northing: Easting: Wellhead Elevation: 5,960,630.760 usft 676,088.190 usft 36.02 usft Latitude: Longitude: Ground Level: 70° 17' 52.919 N 148° 34'26.072 W 33.16 usft Wellbore 15-16C Magnetics Model Name Sample Date Declination (°) Dip Angle Field Strength (°) (nT) BGGM2016 1/112017 18.14 81.02 57,558 Design 15-16C Audit Notes: Version: Vertical Section: Phase: ACTUAL Depth From (TVD) +N/ -S (usft) (usft) 24.98 0.00 Tie On Depth +E/ -W (usft) 0.00 15, 080.69 Direction 17.70 1/3/2017 4:24:19PM Page 2 COMPASS 5000.1 Build 81B by Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16C Design: 15-16C Survey Program From (usft) 90.00 4,587.00 4,626.54 4,813.93 12,409.41 12,938.02 13,289.50 15,100.00 Survey MD (usft) 24.98 90.00 190.00 290.00 390.00 490.00 590.00 690.00 790.00 890.00 990.00 1,090.00 1,190.00 1,290.00 1,390.00 1,490.00 1,590.00 1/3/2017 4:24:19PM Date 1/3/2017 To (usft) Survey (Wellbore) 4,540.00 15-16 Srvy 2 GYD CT CMS (15-16) 4,604.00 15-16BPB1 Srvy 1 Blind (15-16BPB1) 4,720.47 15-16BPB1 Srvy 2 Inc+Trend (15-16BPB1 12,335.13 15-16BPB1 Srvy 3 MWD+IFR+MS (15-16B 12,912.00 15-166P61 Srvy 4 MWD+IFR+MS (15-16B 13,281.94 15-16B Srvy 1 MWD+IFR+MS (15-16B) 15,080.69 15-16CPB2 CTK MWD 3-1/4" (15-16CPB2 16,071.93 15-16C CTK MWD 3-1/4 (15-16C) BP Final Survey Report Local Co-ordinate Reference: Well 15-16 TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) MD Reference: 15-16B @ 61.00usft (Nabors 7ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Tool Name Description GYD-CT-CMS Gyrodata cont.casing m/s BLIND Blind drilling INC+TREND Inclinometer+ known azi trend MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD MWD - Standard MWD MWD - Standard Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) 0.00 0.00 24.98 -36.02 0.00 0.00 5,960,630.760 676,088.190 0.00 0.37 179.86 90.00 29.00 -0.21 0.00 5,960,630.550 676,088.195 0.57 0.43 158.08 190.00. 129.00 -0.88 0.14 5,960,629.883 676,088.352 0.16 0.36 180.27 289.99 228.99 -1.54 0.28 5,960,629.224 676,088.506 0.17 0.51 168.24 389.99 328.99 -2.29 0.37 5,960,628.476 676,088.613 0.17 0.43 179.07 489.99 428.99 -3.10 0.47 5,960,627.668 676,088.729 0.12 0.49 164.12 589.99 528.99 -3.89 0.59 5,960,626.885 676,088.870 0.13 0.41 178.64 689.98 628.98 -4.66 0.71 5,960,626.119 676,089.014 0.14 0.12 121.30 789.98 728.98 -5.07 0.81 5,960,625.709 676,089.121 0.36 0.37 81.65 889.98 828.98 -5.08 1.22 5,960,625.711 676,089.530 0.29 0.43 85.77 989.98 928.98 -5.00 1.92 5,960,625.802 676,090.222 0.07 0.32 93.93 1,089.98 1,028.98 -5.00 2.57 5,960,625.826 676,090.874 0.12 0.30 72.48 1,189.97 1,128.97 -4.94 3.10 5,960,625.898 676,091.401 0.12 0.40 81.01 1,289.97 1,228.97 -4.80 3.69 5,960,626.045 676,091.992 0.11 0.40 115.46 1,389.97 1,328.97 -4.90 4.35 5,960,625.965 676,092.654 0.24 0.31 96.64 1,489.97 1,428.97 -5.08 4.93 5,960,625.797 676,093.242 0.15 0.46 131.91 1,589.97 1,528.97 -5.38 5.50 5,960,625,511 676,093.816 0.27 Page 3 MARV BAKER HUGHES V. Sec (usft) 0.00 -0.20 -0.80 -1.38 -2.07 -2.8: -3.53 -4.22 -4.58 -4.47 -4.19 -3.98 -3.76 -3.45 -3.34 -3.34 -3.45 COMPASS 5000.1 Build 81B ri.2 BAKER HUGHES Survey BP Obp Final Survey Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Inc Azi (azimuth) TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Project: Prudhoe Bay MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 North Reference: True Well: 15-16 Survey Calculation Method: Minimum Curvature Wellbore: 15-16C Database: EDM R5K - Alaska PROD - ANCP1 Design: 15-16C 0.41 126.75 ri.2 BAKER HUGHES Survey MD Inc Azi (azimuth) TVD TVDSS N/S ENV Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 1,690.00 0.41 126.75 1,689.96 1,628.96 -5.86 6.09 5,960,625.043 676,094.413 0.06 3.73 1,790.00 0.28 164.95 1,789.96 1,728.96 -6.31 6.44 5,960,624.601 676,094.773 0.26 -4.0f 1,890.00 0.34 163.56 1,889.96 1,828.96 -6.83 6.58 5,960,624.085 676,094.933 0.06 -4.51 1,990.00 0.53 67.10 1,989.96 1,928.96 -6.94 7.09 5,960,623.992 676,095.445 0.66 -4.45 2,090.00 0.64 69.28 2,089.95 2,028.95 -6.56 8.04 5,960,624.392 676,096.384 0.11 -3.80 2,190.00 0.60 82.25 2,189.95 2,128.95 -6.29 9.08 5,960,624.684 676,097.419 0.15 -3.23 2,290.00 0.86 153.02 2,289.94 2,228.94 -6.89 9.94 5,960,624.106 676,098.292 0.87 -3.54 2,390.00 0.96 160.89 2,389.93 2,328.93 -8.35 10.56 5,960,622.661 676,098.941 0.16 -4.74 2,485.00 0.89 153.98 2,484.92 2,423.92 -9.77 11.14 5,960,621.258 676,099.559 0.14 -5.92 13 3/8" 2,490.00 0.89 153.59 2,489.92 2,428.92 -9.84 11.18 5,960,621.189 676,099.595 0.14 5.97 2,590.00 1.43 24.44 2,589.90 2,528.90 -9.40 12.04 5,960,621.649 676,100.446 2.11 -5.29 2,690.00 4.99 19.36 2,689.73 2,628.73 -4.16 14.00 5,960,626.934 676,102.281 3.57 0.30 2,790.00 6.55 12.61 2,789.22 2,728.22 5.51 16.69 5,960,636.664 676,104.741 1.70 10.33 2,890.00 8.25 7.65 2,888.39 2,827.39 18.19 18.89 5,960,649.389 676,106.644 1.81 23.07 2,990.00 9.99 13.86 2,987.12 2,926.12 33.73 21.92 5,960,664.988 676,109.312 2.00 38.79 3,090.00 11.39 28.91 3,085.40 3,024.40 50.80 28.77 5,960,682.212 676,115.763 3.11 57.1/ 3,190.00 12.85 35.21 3,183.18 3,122.18 68.53 39.96 5,960,700.199 676,126.530 1.97 77.43 3,290.00 13.38 25.23 3,280.58 3,219.58 88.08 51.30 5,960,720.013 676,137.412 2.32 99.51 3,340.00 14.04 24.08 3,329.16 3,268.16 98.85 56.24 5,960,730.896 676,142.099 1.43 111.27 3,390.00 14.79 23.96 3,377.58 3,316.58 110.22 61.31 5,960,742.380 676,146.897 1.50 123.64 3,440.00 15.54 24.87 3,425.84 3,364.84 122.13 66.72 5,960,754.412 676,152.025 1.57 136.63 3,490.00 16.40 26.22 3,473.91 3,412.91 134.54 72.65 5,960,766.956 676,157.668 1.87 150.26 3,540.00 17.20 27.38 3,521.78 3,460.78 147.44 79.17 5,960,780.001 676,163.882 1.73 164.53 3,590.00 18.81 29.52 3,569.33 3,508.33 161.02 86.55 5,960,793.749 676,170.933 3.48 179.71 3,640.00 20.34 30.37 3,616.43 3,555.43 175.53 94.91 5,960,608.453 676,178.956 3.11 196.08 3,690.00 21.45 31.12 3,663.15 3,602.15 190.85 104.03 5,960,823.986 676,187.713 2.28 213.45 1/3/2017 4:24:19PM Page 4 COMPASS 5000.1 Build 818 p Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16C Design: 15-16C BP Final Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 15-16 15-16B @ 61.00usft (Nabors 7ES) 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 VGr2 BAKER HUGHES Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 3,740.00 22.83 31.56 3,709.46 3,648.46 206.95 113.83 5,960,840.302 676,197.135 2.78 231.7( 3,790.00 24.12 31.76 3,755.32 3,694.32 223.90 124.29 5,960,857.494 676,207.189 2.58 251.09 3,840.00 25.64 31.75 3,800.68 3,739.68 241.78 135.36 5,960,875.634 676,217.837 3.04 271.49 3,890.00 27.86 31.39 3,845.32 3,784.32 260.96 147.14 5,960,895.078 676,229.162 4.45 293.34 3,940.00 29.43 31.59 3,889.20 3,828.20 281.40 159.66 5,960,915.802 676,241.200 3.15 316.62 3,990.00 31.04 31.61 3,932.40 3,871.40 302.84 172.85 5,960,937.547 676,253.885 3.22 341.06 4,040.00 32.33 31.79 3,974.95 3,913.95 325.18 186.65 5,960,960.207 676,267.158 2.59 366.54 4,090.00 33.53 32.30 4,016.91 3,955.91 348.22 201.07 5,960,983.574 676,281.036 2.46 392.87 4,140.00 34.98 32.84 4,058.24 3,997.24 371.94 216.23 5,961,007.637 676,295.627 2.96 420.07 4,190.00 36.31 33.17 4,098.87 4,037.87 396.37 232.10 5,961,032.435 676,310.922 2.69 448.18 4,240.00 38.51 33.62 4,138.58 4,077.58 421.73 248.82 5,961,058.175 676,327.043 4.43 477.42 4,290.00 40.39 33.70 4,177.19 4,116.19 448.17 266.43 5,961,085.021 676,344.026 3.76 507.96 4,340.00 42.01 33.81 4,214.81 4,153.81 475.55 284.73 5,961,112.822 676,361.678 3.24 539.61 4,390.00 43.50 33.74 4,251.52 4,190.52 503.77 303.60 5,961,141.468 676,379.880 2.98 572.23 4,440.00 44.46 33.81 4,287.50 4,226.50 532.63 322.90 5,961,170.771 676,398.499 1.92 605.59 4,490.00 45.45 33.90 4,322.88 4,261.88 "' 561.96 342.58 5,961,200.559 676,417.486 1.98 639.5 4,540.00 47.24 34.25 4,357.40 4,296.40 591.93 362.85 5,961,230.986 676,437.045 3.62 674.23 4,587.00 49.09 34.55 4,388.74 4,327.74 620.82 382.63 5,961,260.332 676,456.146 3.96 707.77 96181. 4,604.00 49.90 37.00 4,399.79 4,338.79 631.30 390.19 5,961,270.990 676,463.455 11.95 720.06 4,626.54 49.22 38.00 4,414.41 4,353.41 644.91 400.63 5,961,284.840 676,473.575 4.53 736.20 4,720.47 51.78 43.80 4,474.18 4,413.18 699.60 448.10 5,961,340.626 676,519.742 5.49 802.73 4,813.93 56.37 48.05 4,529.02 4,468.02 752.16 502.49 5,961,394.434 676,572.886 6.14 869.33 4,906.86 59.65 44.78 4,578.25 4,517.25 806.51 559.53 5,961,450.102 676,628.638 4.62 938.46 5,003.33 62.85 48.04 4,624.66 4,563.66 864.78 620.80 5,961,509.787 676,688.516 4.45 1,012.60 5,096.00 65.42 41.60 4,665.11 4,604.11 923.91 679.49 5,961,570.279 676,745.804 6.84 1,086.78 5,193.19 66.05 41.60 4,705.05 4,644.05 990.17 738.32 5,961,637.892 676,803.058 0.65 1,167.79 11312017 4:24:19PM Page 5 COMPASS 5000.1 Build 81B Obp Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16C Design: 15-16C BP Final Survey Report Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Database: Fel FA9 BAKER HUGHES Well 15-16 15-16B @ 61.00usft (Nabors 7ES) 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature EDM R5K -Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 5,286.33 66.86 41.77 4,742.26 4,681.26 1,053.94 795.10 5,961,702.967 676,858.329 0.89 1,245.80 5,378.55 66.00 40.77 4,779.14 4,718.14 1,117.46 850.86 5,961,767.779 676,912.576 1.36 1,323.2. 5,472.62 64.46 39.04 4,818.55 4,757.55 1,182.98 905.65 5,961,834.553 676,965.820 2.34 1,402.35 5,570.80 65.40 38.90 4,860.15 4,799.15 1,252.12 961.58 5,961,904.981 677,020.109 0.97 1,485.22 5,666.46 63.33 38.54 4,901.54 4,840.54 1,319.40 1,015.53 5,961,973.506 677,072.460 2.19 1,565.72 5,757.98 63.20 38.03 4,942.71 4,881.71 1,383.56 1,066.17 5,962,038.828 677,121.581 0.52 1,642.24 5,852.93 63.06 39.82 4,985.63 4,924.63 1,449.45 1,119.38 5,962,105.942 677,173.232 1.69 1,721.19 5,947.04 63.90 43.51 5,027.66 4,966.66 1,512.33 1,175.36 5,962,170.116 677,227.712 3.62 1,798.12 6,041.27 64.55 44.66 5,068.63 5,007.63 1,573.28 1,234.39 5,962,232.428 677,285.300 1.30 1,874.13 6,136.26 64.38 47.07 5,109.59 5,048.59 1,632.96 1,295.90 5,962,293.529 677,345.389 2.30 1,949.69 6,230.93 65.05 46.45 5,150.02 5,089.02 1,691.60 1,358.26 5,962,353.611 677,406.351 0.92 2,024.51 6,259.71 65.49 46.48 5,162.06 5,101.06 1,709.61 1,377.21 5,962,372.054 677,424.873 1.53 2,047.43 6,318.80 67.15 45.22 5,185.79 5,124.79 1,747.30 1,416.03 5,962,410.645 677,462.800 3.42 2,095.14 6,368.92 63.86 46.23 5,206.57 5,145.57 1,779.14 1,448.68 5,962,443.237 677,494.691 6.82 2,135.40 6,410.76 61.23 46.69 5,225.86 5,164.86 1,804.71 1,475.59 5,962,469.434 677,520.992 6.36 2,167.95 6,504.67 61.20 47.28 5,271.08 5,210.08 1,860.86 1,535.77 5,962,526.973 677,579.836 0.55 2,239.74 6,596.18 61.28 48.08 5,315.11 5,254.11 1,914.87 1,595.08 5,962,582.354 677,637.865 0.77 2,309.2. 6,699.05 61.46 47.28 5,364.40 5,303.40 1,975.66 1,661.84 5,962,644.689 677,703.179 0.70 2,387.44 6,796.68 61.11 47.94 5,411.31 5,350.31 2,033.39 1,725.08 5,962,703.876 677,765.043 0.69 2,461.66 6,886.49 61.53 47.54 5,454.41 5,393.41 2,086.37 1,783.39 5,962,758.211 677,822.094 0.61 2,529.87 6,980.91 60.83 46.42 5,499.93 5,438.93 2,142.81 1,843.88 5,962,816.045 677,881.233 1.28 2,602.02 7,075.82 62.24 46.48 5,545.16 5,484.16 2,200.29 1,904.35 5,962,874.927 677,940.337 1.49 2,675.17 7,170.28 61.35 44.92 5,589.81 5,528.81 2,258.43 1,963.92 5,962,934.436 677,998.532 1.73 2,748.67 7,264.26 61.13 43.53 5,635.03 5,574.03 2,317.46 2,021.39 5,962,994.798 678,054.591 1.32 2,822.38 7,357.92 64.10 44.99 5,678.10 5,617.10 2,377.00 2,079.43 5,963,055.680 678,111.219 3.46 2,896.75 7,453.73 66.20 45.16 5,718.37 5,657.37 2,438.40 2,140.98 5,963,118.491 678,171.312 2.20 2,973.95 7,548.68 66.40 45.16 5,756.53 5,695.53 2,499.70 2,202.63 5,963,181.220 678,231.504 0.21 3,051.10 1/3/2017 4:24:19PM Page 6 COMPASS 5000.1 Build 81B 7 '1 2� b BP EARNp Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16C Survey Calculation Method: Minimum Curvature Design: 15-16C Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 7,643.91 66.66 45.51 5,794.46 5,733.46 2,561.10 2,264.76 5,963,244.059 678,292.171 0.43 3,128.4! 7,734.70 66.23 45.30 5,830.74 5,769.74 2,619.54 2,324.02 5,963,303.859 678,350.045 0.52 3,202.18 7,829.73 66.95 45.54 5,868.50 5,807.50 2,680.75 2,386.14 5,963,366.505 678,410,706 0.79 3,279.38 7,924.91 66.18 45.79 5,906.35 5,845.35 2,741.78 2,448.60 5,963,428.977 678,471.717 0.84 3,356.51 8,022.53 66.32 45.30 5,945.67 5,884.67 2,804.35 2,512.38 5,963,493.028 678,534.009 0.48 3,435.52 8,116.99 65.94 44.40 5,983.89 5,922.89 2,865.59 2,573.30 5,963,555.673 678,593.473 0.96 3,512.38 8,210.59 65.92 43.97 6,022.07 5,961.07 2,926.88 2,632.86 5,963,618.331 678,651.581 0.42 3,588.87 8,303.68 66.06 43.13 6,059.94 5,998.94 2,988.51 2,691.45 5,963,681.314 678,708.705 0.84 3,665.40 8,397.95 65.51 42.44 6,098.61 6,037.61 3,051.60 2,749.85 5,963,745.758 678,765.605 0.89 3,743.27 8,490.59 65.38 41.74 6,137.11 6,076.11 3,114.13 2,806.33 5,963,809.589 678,820.601 0.70 3,820.01 8,584.52 65.53 39.71 6,176.13 6,115.13 3,178.88 2,862.07 5,963,875.621 678,874.806 1.97 3,898.64 8,678.96 65.55 38.62 6,215.24 6,154.24 3,245.53 2,916.36 5,963,943.520 678,927.516 1.05 3,978.64 8,776.77 65.64 38.11 6,255.65 6,,194.65 3,315.37 2,971.64 5,964,014.629 678,981.143 0.48 4,061.98 8,872.08 65.77 39.26 6,294.87 6,233.87 3,383.18 3,025.94 5,964,083.686 679,033.832 1.11 4,143.09 8,966.07 65.72 40.92 6,333.48 6272.48 3,448.73 3,081.12 5,964,150:512 679,087.460 1.61 4,222.32 9,059.53 65.45 41.68 6,372.11 6,311.11 3,512.67 3,137.29 5,964,215.740 679,142.110 0.79 4,300.3 9,153.43 65.49 41.05 6,411.09 6,350.09 3,576.78 3,193.74 5,964,281.154 679,197.041 0.61 4,378.55 9,247.90 65.39 40.28 6,450.36 6,389.36 3,641.95 3,249.73 5,964,347.618 679,251.485 0.75 4,457.66 9,343.13 65.39 39.26 6,490.02 6,429.02 3,708.50 3,305.11 5,964,415.439 679,305.292 0.97 4,537.90 9,436.42 65.42 39.65 6,528.85 6,467.85 3,773.99 3,359.02 5,964,482.175 679,357.643 0.38 4,616.69 9,531.09 65.49 39.44 6,568.17 6,507.17 3,840.40 3,413.85 5,964,549.843 679,410.897 0.21 4,696.62 9,624.40 65.35 38.85 6,606.99 6,545.99 3,906.21 3,467.41 5,964,616.884 679,462.904 0.59 4,775.60 9,718.66 65.40 38.86 6,646.26 6,585.26 3,972.94 3,521.17 5,964,684.849 679,515.079 0.05 4,855.51 9,812.95 65.32 38.39 6,685.57 6,624.57 4,039.89 3,574.67 5,964,753.036 679,566.990 0.46 4,935.57 9,908.17 65.45 39.06 6,725.24 6,664.24 4,107.43 3,628.82 5,964,821.817 679,619.544 0.65 5,016.37 10,002.84 65.73 39.81 6,764.36 6,703.36 4,174.01 3,683.58 5,964,889.658 679,672.725 0.78 5,096.45 10,097.24 66.79 41.45 6,802.37 6,741.37 4,239.58 3,739.85 5,964,956.528 679,727.439 1.95 5,176.03 1/3/2017 4:24:19PM Page 7 COMPASS 5000.1 Build 81B Survey MD Inc BP TVD FIas NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) BAKER Obp (usft) Final Survey Report (°I100usft) ES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 6,779.82 4,304.72 3,799.06 TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) 1.77 Project: Prudhoe Bay MD Reference: 15-16B @ 61.00usft (Nabors 7ES) 6,879.37 Site: PB DS 15 North Reference: True 679,843.027 Well: 15-16 Survey Calculation Method: Minimum Curvature 45.37 Wellbore: 15-16C Database: EDM R5K - Alaska PROD - ANCP1 5,965,147.177 Design: 15-16C 5,408.41 10,476.11 65.93 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 10,193.30 66.02 43.10 6,840.82 6,779.82 4,304.72 3,799.06 5,965,023.027 679,785.103 1.77 5,256.08 10,286.68 65.22 45.46 6,879.37 6,818.37 4,365.61 3,858.43 5,965,085.288 679,843.027 2.46 5,332.1 10,381.40 65.65 45.37 6,918.75 6,857.75 4,426.08 3,919.79 5,965,147.177 679,902.944 0.46 5,408.41 10,476.11 65.93 45.43 6,957.58 6,896.58 4,486.73 3,981.29 5,965,209.250 679,963.007 0.30 5,484.89 10,569.67 65.90 45.52 6,995.77 6,934.77 4,546.62 4,042.19 5,965,270.551 680,022.479 0.09 5,560.47 10,664.13 65.90 45.38 7,034.34 6,973.34 4,607.11 4,103.64 5,965,332.460 680,082.489 0.14 5,636.78 10,757.63 63.84 44.46 7,074.04 7,013.04 4,667.05 4,163.41 5,965,393.772 680,140.837 2.38 5,712.05 10,853.14 60.04 43.42 7,118.96 7,057.96 4,727.71 4,221.89 5,965,455.790 680,197.878 4.09 5,787.62 10,947.88 57.26 40.47 7,168.25 7,107.25 4,787.86 4,275.98 5,965,517.179 680,250.540 3.96 5,861.37 11,039.80 53.73 39.27 7,220.32 7,159.32 4,845.97 4,324.54 5,965,576.413 680,297.724 3.99 5,931.50 11,135.27 51.98 36.23 7,277.97 7,216.97 4,906.11 4,371.14 5,965,637.627 680,342.896 3.13 6,002.96 11,228.64 51.31 33.78 7,335.92 7,274.92 4,966.08 4,413.14 5,965,698.552 680,383.479 2.18 6,072.85 11,323.20 50.84 31.00 7,395.34 7,334.34 5,028.18 4,452.55 5,965,761.559 680,421.415 2.34 6,144.00 11,417.12 49.15 29.95 7,455.71 7,394.71 5,090.18 4,489.04 5,965,824.388 680,456.441 1.99 6,214.16 11,512.52 46.22 28.86 7,519.93 7,458.93 5,151.62 4,523.68 5,965,886.619 680,489.635 3.19 6,283.22 11,607.94 43.19 28.33 7,587.74 7,526.74 5,210.54 4,555.81 5,965,946.277 680,520.373 3.20 6,349.13 11,700.55 40.75 26.16 7,656.59 7,595.59 5,265.58 4,584.18 5,966,001.960 680,547.445 3.07 6,410.1 11,795.50 37.26 20.32 7,730.39 7,669.39 5,320.38 4,607.84 5,966,057.301 680,569.812 5.33 6,469.59 11,890.04 33.52 15.98 7,807.46 7,746.46 5,372.34 4,624.98 5,966,109.645 680,585.723 4.76 6,524.30 11,984.92 34.83 15.02 7,885.96 7,824.96 5,423.70 4,639.21 5,966,161.318 680,598.749 1.49 6,577.55 12,079.57 34.93 14.55 7,963.61 7,902.61 5,476.04 4,653.02 5,966,213.958 680,611.331 0.30 6,631.61 12,173.85 35.46 17.28 8,040.66 7,979.66 5,528.28 4,667.93 5,966,266.532 680,625.007 1.76 6,685.91 12,268.00 34.76 18.75 8,117.68 8,056.68 5,579.77 4,684.67 5,966,318.401 680,640.535 1.17 6,740.05 12,335.13 34.68 17.99 8,172.85 8,111.85 5,616.06 4,696.72 5,966,354.956 680,651.730 0.66 6,778.29 12,398.00 34.74 17.59 8,224.54 8,163.54 5,650.14 4,707.66 5,966,389.288 680,661.866 0.37 6,814.09 7" 12,409.41 34.75 17.52 8,233.91 8,172.91 5,656.34 4,709.62 5,966,395.532 680,663.682 0.37 6,820.59 8 COMPASS 5000.1 Build 81B 1/3/2017 4:24:19PM Page BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16C Survey Calculation Method: Minimum Curvature Design: 15-16C Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) ND (usft) (°) (°) (usft) 12, 439.21 34.56 17.51 8,258.42 12,470.89 37.18 15.35 8,284.09 12,503.45 40.47 13.47 8,309.46 12,534.30 39.83 12.73 8,333.04 12,567.14 41.78 8.81 8,357.90 12,598.01 45.60 7.12 8,380.22 12,629.48 45.23 7.03 8,402.31 12,661.36 47.37 4.19 8,424.34 12,692.54 51.10 1.51 8,444.69 12,723.54 50.73 1.56 8,464.24 12,755.41 50.67 1.34 8,484.42 12,787.08 53.01 1.18 8,503.99 12,818.21 58.28 0.83 8,521.55 12,850.06 59.27 1.28 8,538.06 12,881.58 62.72 369.99 8,553.34 12,912.00 66.73 359.42 8,566.33 41 /2" 5,966,580.293 680,692.372 13.62 12,938.02 66.96 0.31 8,576.56 12,969.25 62.70 358.81 8,589.84 13,000.02 65.52 355.30 8,603.28 13,032.34 68.81 354.07 8,615.82 13,062.36 72.07 353.91 8,625.87 13,092.77 75.99 351.48 8,634.24 13,124.60 78.73 351.17 8,641.20 13,156.96 79.16 351.10 8,647.40 13,187.96 79.46 351.23 8,653.16 13,219.79 79.60 351.18 8,658.94 1/3/2017 4:24:19PM l®I BAKER HUGHES TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 8,197.42 5,672.50 4,714.72 5,966,411.806 680,668.401 0.64 6,837.5: 8,223.09 5,690.31 4,719.96 5,966,429.726 680,673.221 9.18 6,856.09 8,248.46 5,710.08 4,725.02 5,966,449.608 680,677.823 10.73 6,876.46 8,272.04 5,729.45 4,729.53 5,966,469.080 680,681.877 2.59 6,896.29 8,296.90 5,750.53 4,733.53 5,966,490.242 680,685.376 9.80 6,917.58 8,319.22 5,771.64 4,736.47 5,966,511.418 680,687.823 12.94 6,938.59 8,341.31 5,793.88 4,739.23 5,966,533.718 680,690.062 1.19 6,960.62 8,363.34 5,816.82 4,741.47 5,966,556.695 680,691.766 9.30 6,983.15 8,383.69 5,840.39 4,742.63 5,966,580.293 680,692.372 13.62 7,005.96 8,403.24 5,864.45 4,743.28 5,966,604.354 680,692.452 1.20 7,029.07 8,423.42 5,889.10 4,743.90 5,966,629.015 680,692.499 0.57 7,052.75 8,442.99 5,914.00 4,744.45 5,966,653.913 680,692.462 7.40 7,076.63 8,460.55 5,939.68 4;744.90 5,966,679.601 880,892.308 16.95 7,101.24 8,477.06 5,966.91 4,745.40 '' 5,966,706.835 680,692.172 3.33 7,127.33 8,492.34 5,994.47 4,745.70 5,966,734.393 680,691.827 11.52 7,153.68 8,505.33 6,021.98 4,745.55 5,966,761.882 680,691.038 13.29 7,179.8' 8,515.56 6,045.90 4,745.50 5,966,785.796 680,690.422 3.27 7,202.61 8,528.84 6,074.16 4,745.29 5,966,814.038 680,689.549 14.32 7,229.46 8,542.28 6,101.79 4,743.86 5,966,841.631 680,687.470 13.76 7,255.35 8,554.82 6,131.45 4,741.09 5,966,871.210 680,684.014 10.77 7,282.76 8,564.87 6,159.57 4,738.13 5,966,899.259 680,680.394 10.87 7,308.66 8,573.24 6,188.56 4,734.41 5,966,928.152 680,675.994 15.01 7,335.14 8,580.20 6,219.26 4,729.72 5,966,958.732 680,670.591 8.66 7,362.97 8,586.40 6,250.64 4,724.83 5,966,989.987 680,664.963 1.35 7,391.37 8,592.16 6,280.74 4,720.15 5,967,019.967 680,659.581 1.05 7,418.62 8,597.94 6,311.68 4,715.37 5,967,050.777 680,654.072 0.47 7,446.64 Page 9 COMPASS 5000.1 Build 81B Ues.FJr,. rias BP Survey BAKER Oby Final Survey Report HUGHES Local Co-ordinate Reference: Well 15-16 Azi (azimuth) Company: North America - ALASKA- BP TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Northing Project: Prudhoe Bay MD Reference: 15-16B @ 61.00usft (Nabors 7ES) V) Site: Pr DS 15 PBD North Reference: True (usft) Wel: Survey Calculation Method: Minimum Curvature 13,251.13 Wellbore: 16C 15- 16C Database: EDM R5K -Alaska PROD - ANCP1 6,342.13 Ues.FJr,. Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting (usft) DLeg (°/100usft) V. Sec (usft) (usft) V) V) (usft) (usft) (usft) (usft) (usft) 13,251.13 79.81 350.82 8,664.54 8,603.54 6,342.13 4,710.54 5,967,081.109 680,648.536 1.31 7,474.18 13,281.94 80.23 351.08 8,669.88 8,608.88 6,372.10 4,705.77 5,967,110.953 680,643.063 1.60 7,501.2 13,289.50 80.33 350.88 8,671.16 8,610.16 6,379.46 4,704.60 5,967,118.283 680,641.723 2.89 7,507.93 13,309.63 84.22 347.74 8,673.86 8,612.86 6,399.05 4,700.90 5,967,137.784 680,637.564 24.75 7,525.48 13,337.38 89.01 343.46 8,675.50 8,614.50 6,425.87 4,694.01 5,967,164.430 680,630.050 23.13 7,548.93 13,367.45 89.97 338.86 8,675.77 8,614.77 6,454.32 4,684.31 5,967,192.643 680,619.680 15.63 7,573.08 13,397.57 89.72 333.17 8,675.85 8,614.85 6,481.83 4,672.07 5,967,219.854 680,606.801 18.91 7,595.56 13,427.65 88.80 326.95 8,676.24 8,615.24 6,507.88 4,657.06 5,967,245.544 680,591.192 20.90 7,615.82 13,457.43 88.31 319.87 8,676.99 8,615.99 6,531.77 4,639.33 5,967,269.009 680,572.904 23.82 7,633.18 13,487.83 87.33 314.24 8,678.15 8,617.15 6,553.99 4,618.64 5,967,290.745 680,551.702 18.78 7,648.07 13,517.43 85.75 307.19 8,679.94 8,618.94 6,573.25 4,596.26 5,967,309.475 680,528.880 24.37 7,659.61 13,547.71 85.61 300.46 8,682.22 8,621.22 6,590.05 4,571.19 5,967,325.680 680,503.426 22.17 7,667.99 13,577.65 84.99 293.34 8,684.68 8,623.68 6,603.54 4,544.60 5,967,338.545 680,476.526 23.79 7,672.76 13,607.66 85.64 286.28 8,687.13 8,626.13 6,613.67 4,516.48 5,967,348.611 680,448.177 23.55 7,673.86 13,610.00 85.62 285.79 8,687.31 8,626.31 6,614.32 4,514.24 5,967;34&.603 680,445.920 20.99 7,673.79 13,635.27 89.51 286.85 8,688.38 8,627.38 6,621.41 4,490.01 5,967,355.126 680,421.537 15.97 7,673.18 13,665.51 91.41 284.39 8,688.14 8,627.14 6,629.55 4,460.89 5,967,362.582 680,392.237 10.28 7,672.0 13,696.02 90.31 281.37 8,687.68 8,626.68 6,636.35 4,431.16 5,967,368.682 680,362.353 10.53 7,669.52 13,725.56 89.88 277.50 8,687.63 8,626.63 6,641.19 4,402.02 5,967,372.840 680,333.115 13.18 7,665.27 13,755.42 90.03 273.98 8,687.66 8,626.66 6,644.18 4,372.32 5,967,375.128 680,303.349 11.80 7,659.08 13,785.50 89.91 270.63 8,687.67 8,626.67 6,645.39 4,342.27 5,967,375.634 680,273.280 11.14 7,651.10 13,815.66 89.82 266.71 8,687.74 8,626.74 6,644.69 4,312.12 5,967,374.228 680,243.160 13.00 7,641.26 13,845.44 90.15 263.03 8,687.75 8,626.75 6,642.03 4,282.46 5,967,370.871 680,213.577 12.41 7,629.71 13,875.71 88.68 258.37 8,688.06 8,627.06 6,637.14 4,252.60 5,967,365.283 680,183.840 16.14 7,615.97 13,905.42 89.36 253.77 8,688.57 8,627.57 6,629.99 4,223.78 5,967,357.461 680,155.194 15.65 7,600.39 13,935.63 90.98 250.90 8,688.48 8,627.48 6,620.82 4,195.00 5,967,347.624 680,126.637 10.91 7,582.91 13,965.58 89.85 247.08 8,688.26 8,627.26 6,610.09 4,167.04 5,967,336.237 680,098.945 13.30 7,564.18 1/3/2017 4:24:19PM Page 10 COMPASS 5000.1 Build 81B Obp Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16C Design: 15-16C BP Final Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 15-16 15-16B @ 61.00usft (Nabors 7ES) 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Fel FA 2 BAKER HUGHES Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 13,995.54 89.14 241.90 8,688.53 8,627.53 6,597.19 4,140.02 5,967,322.710 680,072.228 17.45 7,543.6 14,025.43 90.34 238.91 8,688.66 8,627.66 6,582.43 4,114.03 5,967,307.347 680,046.596 10.78 7,521.71 14,057.01 92.80 238.35 8,687.80 8,626.80 6,566.00 4,087.08 5,967,290.289 680,020.038 7.99 7,497.87 14,085.50 92.92 242.26 8,686.38 8,625.38 6,551.90 4,062.37 5,967,275.622 679,995.664 13.71 7,476.93 14,114.17 92.27 245.99 8,685.08 8,624.08 6,539.41 4,036.60 5,967,262.526 679,970.201 13.19 7,457.19 14,146.26 92.67 252.00 8,683.69 8,622.69 6,527.92 4,006.68 5,967,250.342 679,940.564 18.75 7,437.15 14,180.68 89.97 255.77 8,682.90 8,621.90 6,518.37 3,973.63 5,967,240.023 679,907.749 13.47 7,418.00 14,210.74 90.55 257.60 8,682.76 8,621.76 6,511.45 3,944.38 5,967,232.417 679,878.671 6.39 7,402.51 14,240.61 89.94 262.09 8,682.64 8,621.64 6,506.18 3,914.99 5,967,226.465 679,849.411 15.17 7,388.56 14,275.63 88.96 266.57 8,682.97 8,621.97 6,502.73 3,880.15 5,967,222.191 679,814.666 13.09 7,374.67 14,305.96 89.05 271.22 8,683.50 8,622.50 6,502.14 3,849.84 5,967,220.897 679,784.378 15.33 7,364.90 14,335.85 88.99 275.71 8,684.01 8,623.01 6,503.95 3,820.02 5,967,222.003 679,754.523 15.02 7,357.55 14,365.93 87.85 280.44 8,684.84 8,623.84 6,508.17 3,790.26 5,967,225.526 679,724.672 16.17 7,352.52 14,395.89 86.22 284.95 8,686.39 8,625.39 6,514.74 3,761.08 5,967,231.413 679,695.348 15.99 7,349.91 14,426.00 85.42 289.68 8,688.59 8,627.59 6,523.68 3,732.42 5,967,239,673 679,666.488 15.89 7,349.70 14,455.62 84.50 294.21 8,691.19 8,630.19 6,534.70 3,705.05 5,967,250.051 679,638.878 15.55 7,351.8 14,485.47 85.64 295.86 8,693.76 8,632.76 6,547.28 3,678.11 5,967,262.000 679,611.649 6.70 7,355.68 14,515.70 85.60 292.31 8,696.06 8,635.06 6,559.58 3,650.60 5,967,273.650 679,583.857 11.71 7,359.03 14,551.09 84.94 288.79 8,698.98 8,637.98 6,571.96 3,617.58 5,967,285.251 679,550.558 10.09 7,360.78 14,575.38 84.13 286.41 8,701.30 8,640.30 6,579.27 3,594.53 5,967,292.019 679,527.349 10.31 7,360.74 14,630.54 85.72 281.55 8,706.18 8,645.18 6,592.54 3,541.23 5,967,304.032 679,473.757 9.24 7,357.17 14,660.98 85.94 278.04 8,708.39 8,647.39 6,597.70 3,511.32 5,967,308.493 679,443.734 11.52 7,353.00 14,690.35 84.62 276.44 8,710.81 8,649.81 6,601.39 3,482.29 5,967,311.501 679,414.622 7.05 7,347.68 14,720.40 86.59 273.49 8,713.11 8,652.11 6,603.98 3,452.44 5,967,313.392 679,384.727 11.78 7,341.07 14,749.66 87.39 269.54 8,714.65 8,653.65 6,604.75 3,423.24 5,967,313.480 679,355.516 13.76 7,332.93 14,780.91 89.17 265.79 8,715.59 8,654.59 6,603.48 3,392.03 5,967,311.476 679,324.353 13.28 7,322.23 14,811.78 89.08 261.78 8,716.06 8,655.06 6,600.14 3,361.36 5,967,307.418 679,293.763 12.99 7,309.72 1/3/2017 4:24:19PM Page 11 COMPASS 5000.1 Build BIB 113/2017 4:24:19PM Page 12 COMPASS 5000.1 Build 81B !/RN BP Survey BAKER Oby Final Survey Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 15-16B @ 61.00usft (Nabors 7ES) Azi (azimuth) Project: Prudhoe Bay TVD Reference: MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Northing Site: PB DS 15 North Reference: True Well: 15-16 Survey Calculation Method: Minimum Curvature (usft) re: Wellbore: 15-16C 15_16C Database: EDM R5K-Alaska PROD -ANCP1 14,840.88 113/2017 4:24:19PM Page 12 COMPASS 5000.1 Build 81B Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting (usft) DLeg (°/100usft) V. Sec (usft) (usft) V) V) (usft) (usft) (usft) (usft) (usft) 14,840.88 91.72 261.11 8,715.86 8,654.86 6,595.81 3,332.58 5,967,302.417 679,265.101 9.36 7,296.85 14,877.98 90.92 257.70 8,715.00 8,654.00 6,588.99 3,296.13 5,967,294.746 679,228.821 9.44 7,279.2 14,901.18 90.15 254.13 8,714.79 8,653.79 6,583.35 3,273.63 5,967,288.576 679,206.463 15.74 7,267.05 14,931.75 90.49 249.62 8,714.62 8,653.62 6,573.84 3,244.59 5,967,278.391 679,177.651 14.79 7,249.16 14,960.64 90.61 247.27 8,714.34 8,653.34 6,563.23 3,217.72 5,967,267.153 679,151.042 8.14 7,230.88 14,991.38 89.97 250.69 8,714.18 8,653.18 6,552.20 3,189.03 5,967,255.460 679,122.621 11.32 7,211.65 15,027.88 88.56 256.20 8,714.65 8,653.65 6,541.81 3,154.06 5,967,244.249 679,087.906 15.58 7,191.11 15,055.91 86.37 256.65 8,715.89 8,654.89 6,535.24 3,126.84 5,967,237.041 679,060.851 7.98 7,176.58 15,080.69 87.67 260.80 8,717.18 8,656.18 6,530.40 3,102.58 5,967,231.637 679,036.710 17.53 7,164.59 15-16C TIP to 15-16CPB2 87.51 264.30 8,717.99 8,656.99 6,527.90 3,083.45 5,967,228.688 679,017.648 18.11 7,156.39 15,100.00 15-16C KOP - Billet 266.03 8,717.43 8,656.43 6,525.42 3,054.20 5,967,225.528 678,988.466 25.07 7,145.14 15,129.38 94.67 15,159.71 90.58 268.23 8,716.04 8,655.04 6,523.91 3,023.95 5,967,223.304 678,958.260 15.31 7,134.50 15,190.51 91.66 271.39 8,715.44 8,654.44 6,523.80 2,993.16 5,967,222.480 678,927.483 10.84 7,125.04 15,225.67 91.90 275.99 8,714.35 8,653.35 6,526.06 2,958.10 5,967,223.919 678,892.381 13.09 7,116.53 15,250.73 92.83 280.04 8,713.31 8,652.31 6,529.56 2,933.31 5,967,226.827 678,867.519 16.57 7,112.3- 15,280.49 94.55 285.17 8,711.40 8,650.40 6,536.03 2,904.34 5,967,232.624 678,838.405 18.15 7,109.68 15,310.47 93.17 289.10 8,709.38 8,648.38 6,544.84 2,875.76 5,967,240.763 678,809.631 13.87 7,109.38 15,335.89 91.26 288.10 8,708.40 8,647.40 6,552.95 2,851.69 5,967,248.297 678,785.376 8.48 7,109.78 15,366.06 87.98 284.14 8,708.60 8,647.60 6,561.32 2,822.72 5,967,255.989 678,756.216 17.04 7,108.95 15,395.33 89.97 280.87 8,709.12 8,648.12 6,567.65 2,794.15 5,967,261.653 678,727.512 13.08 7,106.30 15,425.65 90.80 277.27 8,708.92 8,647.92 6,572.43 2,764.22 5,967,265.729 678,697.475 12.18 7,101.75 15,454.63 90.95 273.96 8,708.47 8,647.47 6,575.27 2,735.38 5,967,267.887 678,668.585 11.43 7,095.68 15,485.69 91.04 271.84 8,707.93 8,646.93 6,576.84 2,704.37 5,967,268.731 678,637.545 6.83 7,087.75 15,521.45 89.05 268.95 8,707.91 8,646.91 6,577.09 2,668.62 5,967,268.140 678,601.798 9.81 7,077.11 15,554.57 89.42 266.11 8,708.35 8,647.35 6,575.66 2,635.53 5,967,265.938 678,568.759 8.65 7,065.69 113/2017 4:24:19PM Page 12 COMPASS 5000.1 Build 81B bOBP p Final Survey Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Project: Prudhoe Bay TVDSS NIS E/W TVD Reference: Site: PB DS 15 MD Reference: Well: 15-16 15.53 (usft) (usft) North Reference: Wellbore: 15-16C Survey Calculation Method: Design: 15-16C Database: Survey Well 15-16 15-16B @ 61.00usft (Nabors 7ES) 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 WE Fag BAKER HUGHES DLeg MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting 8.25 (usft) (°) (°) 15.53 (usft) (usft) (usft) (usft) (usft) (usft) 6,909.45 15,595.71 6,891.66 90.18 260.90 8,708.49 8,647.49 6,571.01 2,594.67 5,967,260.330 678,528.021 16.43 15,626.63 17.70 89.48 258.22 8,708.58 8,647.58 6,565.40 2,564.27 5,967,254.018 678,497.758 6,797.64 15,655.70 92.40 256.78 8,708.11 8,647.11 6,559.11 2,535.89 5,967,247.065 678,469.541 15,690.41 91.75 253.99 8,706.85 8,645.85 6,550.36 2,502.33 5,967,237.530 678,436.196 15,715.89 91.94 251.27 8,706.03 8,645.03 6,542.76 2,478.03 5,967,229.361 678,412.080 15,745.08 90.18 247.09 8,705.49 8,644.49 6,532.39 2,450.76 5,967,218.354 678,385.060 15,770.86 89.97 243.76 8,705.46 8,644.46 6,521.67 2,427.32 5,967,207.089 678,361.877 15,798.41 91.66 242.25 8,705.06 8,644.06 6,509.17 2,402.77 5,967,194.015 678,337.634 15,830.51 89.36 246.03 8,704.78 8,643.78 6,495.17 2,373.89 5,967,179.346 678,309.095 15,858.23 88.43 249.49 8,705.31 8,644.31 6,484.68 2,348.24 5,967,168.261 678,283.700 15,888.92 89.82 253.98 8,705.78 8,644.78 6,475.07 2,319.11 5,967,157.967 678,254.803 15,917.63 90.37 258.01 8,705.73 8,644.73 6,468.12 2,291.26 5,967,150.370 678,227.125 15,948.93 91.57 261.32 8,705.20 8,644.20 6,462.51 2,260.48 5,967,144.037 678,196.484 15,979.53 94.36 264.95 8,703.62 8,642.62 6,458.85 2,230.15 5,967,139.674 678,166.248 16,009.19 16,039.53 95.39 95.93 269.73 275.10 8,701.10 8,640.10 6,457.48 2,200.64 5,967,137.611 678136.779 8,698.10 8,637.10 6,458.75 2,170.48 5,967,138.175 678,106.605 16,071.93 95.99 280.10 8,694.74 8,633.74 6,463.01 2,138.55 5,967,141.686 678,074.585 16,097.00 95.99 280.10 8,692.12 8,631.12 6,467.39 2,114.00 5,967,145.482 678,049.944 2 718" 16,145.00 95.99 280.10 8,687.11 8,626.11 6,475.76 2,067.01 5,967,152.750 678,002.765 Projection to TD Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 16,097.00 8,692.12 2 7/8" 2.785 4.250 WE Fag BAKER HUGHES DLeg V. Sec (°/100usft) (usft) 12.80 7,048.8: 8.96 7,034.25 11.20 7,019.63 8.25 7,001.09 10.70 6,986.46 15.53 6,968.28 12.94 6,950.94 8.23 6,931.57 13.78 6,909.45 12.92 6,891.66 15.31 6,873.64 14.17 6,858.56 11.25 6,843.85 14.95 6,831.15 16.43 6,820.87 17.70 6,812.9 15.35 6,807.26 0.00 6,803.96 0.00 6,797.64 11312017 4:24:19PM Page 13 COMPASS 5000.1 Build 81B Design Annotations Measured Vertical Depth Depth US as (usft) 15,080.69 BF 15,100.00 8,717.99 16,145.00 8,687.11 s Oby Final Survey Report HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 15-16B @ 61.00usft (Nabors 7ES) Project: Prudhoe Bay TVD Reference: MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: Pr DS 15 PBD North Reference: True Well; Survey Calculation Method: Minimum Curvature Wellbore: Well 15-16C Database: EDM R5K - Alaska PROD - ANCP1 Wealbo 15-16C Design Annotations Measured Vertical Depth Depth (usft) (usft) 15,080.69 8,717.18 15,100.00 8,717.99 16,145.00 8,687.11 Local Coordinates +N/ -S +E/ -W (usft) (usft) 6,530.40 3,102.58 6,527.90 3,083.45 6,475.76 2,067.01 Comment 15-16C TIP to 15-16CPB2 15-16C KOP - Billet Projection to TD Prepared By: Yosha Ragbirsingh Survey Manager, Baker Hughes 1/3/2017 4:24:19PM Page 14 COMPASS 5000.1 Build 81B WIPS.a BAKER HUGHES RECEW'D JAN 12 2017 PRINT DISTRIBUTION LIST AOGC COMPANY BP Exploration Alaska Inc WELL NAME 15-16CPB1 FIELD Prudhoe Bay Unit COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(cDbakerhughes.com 21 6154 27912 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 DATA LOGGED t 1301201 900 E. Benson Blvd. M K. BENDE Anchorage, Alaska 99508 to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE December 28, 2016 TODAYS DATE January 11, 2017 Revision STATUS Final Replacement: No Details: Requested by: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOJ% PERSON ATTENTION FIELD FINALCD 1 CD LOGS LOGS (digital/image) Surveys 1# (Final Surveys) 0 # OF PRINTS # OF PKIN 1 S # OF COPIES OF COPIES # OF COPIE 1 BP North Slope 1 0 1 EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 1900 E. Benson Blvd. Anchorage, Alaska 99508 2 IConocoPhillips Alaska Inc. Attn: Ricky Elgaricio PO Box 100360 Anchorage, AK 99510 3 ExxonMobil, Alaska Attn: Lynda M. Vaskell and/or Leonardo Elias 3201 C Street, Suite 505 (Anchorage, AK 99503 0 1 1 0 1 0 4 State of Alaska - AOGCC 1 1 1 Atm: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5i DNR - Division of Oil & Gas *** 0 1 1 Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential' on all material deliver to DNR 6'BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 1900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: Behrooz Raessi TOTALS FOR THIS PAGE: 0 2 4 4 0 0 TOTALS FOR ALL PAGES: 0 2 4 4 0 0 Obp North America - ALASKA - BP Prudhoe Bay PB DS 15 15-16 15-16CPB1 500292111571 Design: 15-16CPB1 Final Survey Report 03 January, 2017 .-I(otsy 2-T912---, FeAA P Ap 2 BAKER HUGHES f�04)�.J BP I/.&a p Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16CPB1 Design: 15-16CPB1 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 15-16 15-16B @ 61.00usft (Nabors 7ES) 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 * OGP-Usa AK [4267*158641 Using Well Reference Point Map Zone: NAD27 * OGP-Usa AK / Alaska zone 4 [26734*1586, Using geodetic scale factor Site PB DS 15, TR -11-14 Site Position: Northing: 5,958,837.360 usft Latitude: 70° 17' 35.236 N From: Map Easting: 676,296.980 usft Longitude: 148° 34'21.213 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.34 ° Well 15-16, 15-16 Well Position +N/ -S 0.00 usft Northing: 5,960,630.760 usft Latitude: 70° 17' 52.919 N +E/ -W 0.00 usft Easting: 676,088.190 usft Longitude: 148° 34'26.072 W Position Uncertainty 0.00 usft Wellhead Elevation: 36.02 usft Ground Level: 33.16 usft Wellbore 15-16CPB1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGGM2016 1/1/2017 18.14 81.02 57,558 Design 15-16CPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 13,281.94 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (I 24.98 0.00 0.00 90.00 1/3/2017 4:28:52PM Page 2 COMPASS 5000.1 Build 81B BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61,00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB1 Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 Database: EDM R5K - Alaska PROD - ANCP1 Has BAKER HUGHES Survey Program Date 1/3/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 90.00 4,540.00 15-16 Srvy 2 GYD CT CMS (15-16) GYD-CT-CMS Gyrodata cont.casing m/s 4,587.00 4,604.00 15-16BPB1 Srvy 1 Blind (15-16BPB1) BLIND Blind drilling 4,626.54 4,720.47 15-16BPB1 Srvy 2 Inc+Trend (15-16BPB1 INC+TREND Inclinometer + known azi trend 4,813.93 12,335.13 15-16BPB1 Srvy 3 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 12,409.41 12,912.00 15-16BPB1 Srvy 4 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 12,938.02 13,281.94 15-16B Srvy 1 MWD+IFR+MS (15-16B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 13,288.00 13,935.72 15-16CPB1 CTK MWD 4-1/4" (15-16CPB1 MWD MWD - Standard Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 24.98 0.00 0.00 24.98 -36.02 0.00 0.00 5,960,630.760 676,088.190 0.00 0.00 90.00 0.37 179.86 90.00 29.00 -0.21 0.00 5,960,630.550 676,088.195 0.57 0.00 190.00 0.43 158.08 190.00 129.00 -0.88 0.14 5,960,629.883 676,088.352 0.16 0.14 290.00 0.36 180.27 _ 289.99 228.99 -1.54 0.28 5,960,629.224 676,088.506 0.17 0.28 390.00 0.51 168.24 389.99 328.99 -2.29 0.37 5,960,628.476 676,088.613 0.17 0.37 490.00 0.43 179.07 489.99 428.99 -3.10 0.47 5,960,627.668 676,088.729 0.12 0.47 590.00 0.49 164.12 589.99 528.99 -3.89 0.59 5,960,626.885 676,088.870 0.13 0.59 690.00 0.41 178.64 689.98 628.98 -4.66 0.71 5,960,626.119 676,089.014 0.14 0.71 790.00 0.12 121.30 789.98 728.98 -5.07 0.81 5,960,625.709 676,089.121 0.36 0.81 890.00 0.37 81.65 889.98 828.98 -5.08 1.22 5,960,625.711 676,089.530 0.29 1.22 990.00 0.43 85.77 989.98 928.98 -5.00 1.92 5,960,625.802 676,090.222 0.07 1.92 1,090.00 0.32 93.93 1,089.98 1,028.98 -5.00 2.57 5,960,625.826 676,090.874 0.12 2.57 1,190.00 0.30 72.48 1,189.97 1,128.97 -4.94 3.10 5,960,625.898 676,091.401 0.12 3.10 1,290.00 0.40 81.01 1,289.97 1,228.97 -4.80 3.69 5,960,626.045 676,091.992 0.11 3.69 1,390.00 0.40 115.46 1,389.97 1,328.97 -4.90 4.35 5,960,625.965 676,092.654 0.24 4.35 1,490.00 0.31 96.64 1,489.97 1,428.97 -5.08 4.93 5,960,625.797 676,093.242 0.15 4.93 1,590.00 0.46 131.91 1,589.97 1,528.97 -5.38 5.50 5,960,625.511 676,093.816 0.27 5.50 1,690.00 0.41 126.75 1,689.96 1,628.96 -5.86 6.09 5,960,625.043 676,094.413 0.06 6.09 1/3/2017 4:28:52PM Page 3 COMPASS 5000.1 Build 81B Vbp Company: Project: Site: Well: Wellbore: Design: North America - ALASKA - BP Prudhoe Bay PB DS 15 15-16 15-16CPB1 15-16CPB1 Survey MD (usft) 1,790.00 1,890.00 1,990.00 2,090.00 2,190.00 2,290.00 2,390.00 2,485.00 13 3/8" 2,490.00 2,590.00 2,690.00 2,790.00 2,890.00 2,990.00 3,090.00 3,190.00 3,290.00 3,340.00 3,390.00 3,440.00 3,490.00 3,540.00 3,590.00 3,640.00 3,690.00 3,740.00 Inc (I 0.28 0.34 0.53 0.64 0.60 0.86 0.96 0.89 0.89 1.43 4.99 6.55 8.25 9.99 11.39 12.85 13.38 14.04 14.79 15.54 16.40 17.20 18.81 20.34 21.45 22.83 Azi (azimuth) TVD (°) (usft) 164.95 1,789.96 163.56 1,889.96 67.10 1,989.96 69.28 2,089.95 82.25 2,189.95 153.02 2,289.94 160.89 2,389.93 153.98 2,484.92 153.59 2,489.92 24.44 2,589.90 19.36 2,689.73 12.61 2,789.22 1,928.96 -6.94 7.65 ". 2,888.39 13.86 2,987.12 28.91 ` 3,085.40 35.21 3,183.18 25.23 3,280.58 24.08 3,329.16 23.96 3,377.58 24.87 3,425.84 26.22 3,473.91 27.38 3,521.78 29.52 3,569.33 30.37 3,616.43 31.12 3,663.15 31.56 3,709.46 BP Final Survey Report Local Co-ordinate Reference: Well 15-16 TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) MD Reference: 15-16B @ 61.00usft (Nabors 7ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 /GA9 BAKER HUGHES TVDSS N/S E/W Northing Easting DI -eq V. Sec (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 1,728.96 -6.31 6.44 5,960,624.601 676,094.773 0.26 6.44 1,828.96 -6.83 6.58 5,960,624.085 676,094.933 0.06 6.58 1,928.96 -6.94 7.09 5,960,623.992 676,095.445 0.66 7.09 2,028.95 -6.56 8.04 5,960,624.392 676,096.384 0.11 8.04 2,128.95 -6.29 9.08 5,960,624.684 676,097.419 0.15 9.08 2,228.94 -6.89 9.94 5,960,624.106 676,098.292 0.87 9.94 2,328.93 -8.35 10.56 5,960,622.661 676,098.941 0.16 10.56 2,423.92 -9.77 11.14 5,960,621.258 676,099.559 0.14 11.14 2,428.92 -9.84 11.18 5,960,621.189 676,099.595 0.14 11.18 2,528.90 -9.40 12.04 5,960,621.649 676,100.446 2.11 12.04 2,628.73 -4.16 14.00 5,960,626.934 676,102.281 3.57 14.00 2,728.22 5.51 16.69 5,960,636.664 676,104.741 1.70 16.69 2,827.39 18.19 18.89 5,960,649.389 676,106.644 1.81 18.89 2,926.12 33.73 21.92 5,960,664.988 676,109.312 2.00 21.92 3,024.40 50.80 28.77 5,960,682.212 676,115.763 3.11 28.77 3,122.18 68.53 39.96 5,960,700.199 676,126.530 1.97 39.96 3,219.58 88.08 51.30 5,960,720.013 676,137.412 2.32 51.30 3,268.16 98.85 56.24 5,960,730.896 676,142.099 1.43 56.24 3,316.58 110.22 61.31 5,960,742.380 676,146.897 1.50 61.31 3,364.84 122.13 66.72 5,960,754.412 676,152.025 1.57 66.72 3,412.91 134.54 72.65 5,960,766.956 676,157.668 1.87 72.65 3,460.78 147.44 79.17 5,960,780.001 676,163.882 1.73 79.17 3,508.33 161.02 86.55 5,960,793.749 676,170.933 3.48 86.55 3,555.43 175.53 94.91 5,960,808.453 676,178.956 3.11 94.91 3,602.15 190.85 104.03 5,960,823.986 676,187.713 2.28 104.03 3,648.46 206.95 113.83 5,960,840.302 676,197.135 2.78 113.83 1/3/2017 4:28.,52PM Page 4 COMPASS 5000.1 Build 81B by Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16CPB1 Design: 15-16CPB1 BP Final Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 15-16 15-16B @ 61.00usft (Nabors 7ES) 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 rew.2 BAKER HUGHES Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 3,790.00 24.12 31.76 3,755.32 3,694.32 223.90 124.29 5,960,857.494 676,207.189 2.58 124.29 3,840.00 25.64 31.75 3,800.68 3,739.68 241.78 135.36 5,960,875.634 676,217.837 3.04 135.36 3,890.00 27.86 31.39 3,845.32 3,784.32 260.96 147.14 5,960,895.078 676,229.162 4.45 147.14 3,940.00 29.43 31.59 3,889.20 3,828.20 281.40 159.66 5,960,915.802 676,241.200 3.15 159.66 3,990.00 31.04 31.61 3,932.40 3,871.40 302.84 172.85 5,960,937.547 676,253.885 3.22 172.85 4,040.00 32.33 31.79 3,974.95 3,913.95 325.18 186.65 5,960,960.207 676,267.158 2.59 186.65 4,090.00 33.53 32.30 4,016.91 3,955.91 348.22 201.07 5,960,983.574 676,281.036 2.46 201.07 4,140.00 34.98 32.84 4,058.24 3,997.24 371.94 216.23 5,961,007.637 676,295.627 2.96 216.23 4,190.00 36.31 33.17 4,098.87 4,037.87 396.37 232.10 5,961,032.435 676,310.922 2.69 232.10 4,240.00 38.51 33.62 4,138.58 4,077.58 421.73 248.82 5,961,058.175 676,327.043 4.43 248.82 4,290.00 40.39 33.70 4,177.19 4,116.19 448.17 266.43 5,961,085.021 676,344.026 3.76 266.43 4,340.00 42.01 33.81 4,214.81 4,153.81 475.55 284.73 5,961,112.822 676,361.678 3.24 284.73 4,390.00 43.50 33.74 4,251.52 4,190.52 503.77 303.60 5,961,141.468 676,379.880 2.98 303.60 4,440.00 44.46 33.81 4,287.50 4,226.50 532.63 322.90 5,961,170.771 676,398.499 1.92 322.90 4,490.00 45.45 33.90 4,322.88 4,261.88 561.96 342.58 5,961,200.559 676,417.486 1.98 342.58 4,540.00 47.24 34.25 4,357.40 4,296.40 591.93 362.85 5,961,230.986 676,437.045 3.62 362.85 4,587.00 49.09 34.55 4,388.74 4,327.74 620.82 382.63 5,961,260.332 676,456.146 3.96 382.63 95/81, 4,604.00 49.90 37.00 4,399.79 4,338.79 631.30 390.19 5,961,270.990 676,463.455 11.95 390.19 4,626.54 49.22 38.00 4,414.41 4,353.41 644.91 400.63 5,961,284.840 676,473.575 4.53 400.63 4,720.47 51.78 43.80 4,474.18 4,413.18 699.60 448.10 5,961,340.626 676,519.742 5.49 448.10 4,813.93 56.37 48.05 4,529.02 4,468.02 752.16 502.49 5,961,394.434 676,572.886 6.14 502.49 4,906.86 59.65 44.78 4,578.25 4,517.25 806.51 559.53 5,961,450.102 676,628.638 4.62 559.53 5,003.33 62.85 48.04 4,624.66 4,563.66 864.78 620.80 5,961,509.787 676,688.516 4.45 620.80 5,096.00 65.42 41.60 4,665.11 4,604.11 923.91 679.49 5,961,570.279 676,745.804 6.84 679.49 5,193.19 66.05 41.60 4,705.05 4,644.05 990.17 738.32 5,961,637.892 676,803.058 0.65 738.32 5,286.33 66.86 41.77 4,742.26 4,681.26 1,053.94 795.10 5,961,702.967 676,858.329 0.89 795.10 1/3/2017 4:28:52PM Page 5 COMPASS 5000.1 Build 81B Vpb BP FS as Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB1 Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 Database: EDM R5K - Alaska PROD - ANCP1 �urveY MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 5,378.55 66.00 40.77 4,779.14 4,718.14 1,117.46 850.86 5,961,767.779 676,912.576 1.36 850.86 5,472.62 64.46 39.04 4,818.55 4,757.55 1,182.98 905.65 5,961,834.553 676,965.820 2.34 905.65 5,570.80 65.40 38.90 4,860.15 4,799.15 1,252.12 961.58 5,961,904.981 677,020.109 0.97 961.58 5,666.46 63.33 38.54 4,901.54 4,840.54 1,319.40 1,015.53 5,961,973.506 677,072.460 2.19 1,015.53 5,757.98 63.20 38.03 4,942.71 4,881.71 1,383.56 1,066.17 5,962,038.828 677,121.581 0.52 1,066.17 5,852.93 63.06 39.82 4,985.63 4,924.63 1,449.45 1,119.38 5,962,105.942 677,173.232 1.69 1,119.38 5,947.04 63.90 43.51 5,027.66 4,966.66 1,512.33 1,175.36 5,962,170.116 677,227.712 3.62 1,175.36 6,041.27 64.55 44.66 5,068.63 5,007.63 1,573.28 1,234.39 5,962,232.428 677,285.300 1.30 1,234.39 6,136.26 64.38 47.07 5,109.59 5,048.59 1,632.96 1,295.90 5,962,293.529 677,345.389 2.30 1,295.90 6,230.93 65.05 46.45 5,150.02 5,089.02 1,691.60 1,358.26 5,962,353.611 677,406.351 0.92 1,358.26 6,259.71 65.49 46.48 5,162.06 5,101.06 1,709.61 1,377.21 5,962,372.054 677,424.873 1.53 1,377.21 6,318.80 67.15 45.22 5,185.79 5,124.79 1,747.30 1,416.03 5,962,410.645 677,462.800 3.42 1,416.03 6,368.92 63.86 46.23 5,206.57 5,145.57a 1,779.14 1,448.68 5,962,443.237 677,494.691 6.82 1,448.68 6,410.76 61.23 46.69 5,225.86 5,164.86P. „ 1,804.71 1,475.59 5,962,469.434 677,520.992 6.36 1,475.59 6,504.67 61.20 47.28 5,271.08 5,210.08 "1,860.86 1,535.77 5,962,526.973 677,579.836 0.55 1,535.77 6,596.18 61.28 48.08 5,315.11 5,254.11 1,914.87 1,595.08 5,962,582.354 677,637.865 0.77 1,595.08 6,699.05 61.46 47.28 5,364.40 5,303.40 1,975.66 1,661.84 5,962,644.689 677,703.179 0.70 1,661.84 6,796.68 61.11 47.94 5,411.31 5,350.31 2,033.39 1,725.08 5,962,703.876 677,765.043 0.69 1,725.08 6,886.49 61.53 47.54 5,454.41 5,393.41 2,086.37 1,783.39 5,962,758.211 677,822.094 0.61 1,783.39 6,980.91 60.83 46.42 5,499.93 5,438.93 2,142.81 1,843.88 5,962,816.045 677,881.233 1.28 1,843.88 7,075.82 62.24 46.48 5,545.16 5,484.16 2,200.29 1,904.35 5,962,874.927 677,940.337 1.49 1,904.35 7,170.28 61.35 44.92 5,589.81 5,528.81 2,258.43 1,963.92 5,962,934.436 677,998.532 1.73 1,963.92 7,264.26 61.13 43.53 5,635.03 5,574.03 2,317.46 2,021.39 5,962,994.798 678,054.591 1.32 2,021.39 7,357.92 64.10 44.99 5,678.10 5,617.10 2,377.00 2,079.43 5,963,055.680 678,111.219 3.46 2,079.43 7,453.73 66.20 45.16 5,718.37 5,657.37 2,438.40 2,140.98 5,963,118.491 678,171.312 2.20 2,140.98 7,548.68 66.40 45.16 5,756.53 5,695.53 2,499.70 2,202.63 5,963,181.220 678,231.504 0.21 2,202.63 7,643.91 66.66 45.51 5,794.46 5,733.46 2,561.10 2,264.76 5,963,244.059 678,292.171 0.43 2,264.76 1/3/2017 4:28:52PM Page 6 COMPASS 5000.1 Build 81B 1 b BP EARN p Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay ND Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB1 Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 7,734.70 66.23 45.30 5,830.74 5,769.74 2,619.54 2,324.02 5,963,303.859 678,350.045 0.52 2,324.02 7,829.73 66.95 45.54 5,868.50 5,807.50 2,680.75 2,386.14 5,963,366.505 678,410.706 0.79 2,386.14 7,924.91 66.18 45.79 5,906.35 5,845.35 2,741.78 2,448.60 5,963,428.977 678,471.717 0.84 2,448.60 8,022.53 66.32 45.30 5,945.67 5,884.67 2,804.35 2,512.38 5,963,493.028 678,534.009 0.48 2,512.38 8,116.99 65.94 44.40 5,983.89 5,922.89 2,865.59 2,573.30 5,963,555.673 678,593.473 0.96 2,573.30 8,210.59 65.92 43.97 6,022.07 5,961.07 2,926.88 2,632.86 5,963,618.331 678,651.581 0.42 2,632.86 8,303.68 66.06 43.13 6,059.94 5,998.94 2,988.51 2,691.45 5,963,681.314 678,708.705 0.84 2,691.45 8,397.95 65.51 42.44 6,098.61 6,037.61 3,051.60 2,749.85 5,963,745.758 678,765.605 0.89 2,749.85 8,490.59 65.38 41.74 6,137.11 6,076.11 3,114.13 2,806.33 5,963,809.589 678,820.601 0.70 2,806.33 8,584.52 65.53 39.71 6,176.13 6,115.13 3,178.88 2,862.07 5,963,875.621 678,874.806 1.97 2,862.07 8,678.96 65.55 38.62 6,215.24 6,154.24 3,245.53 2,916.36 5,963,943.520 678,927.516 1.05 2,916.36 8,776.77 65.64 38.11 6,255.65 6,194.65 3,315.37 2,971.64 5,964,014.629 678,981.143 0.48 2,971.64 8,872.08 65.77 39.26 6,294.87 6,233.87 3,025.94 5,964,083.686 679,033.832 1.11 3,025.94 26 8,966.07 65.72 40.92 6,333.48 6,272.48 13,383,111 3,448.73 3,081.12 5,964,150.512 679,087.460 1.61 3,081.12 9,059.53 65.45 41.68 6,372.11 6,311.11 ", 3,512.67 3,137.29 5,964,215.740 679,142.110 0.79 3,137.29 9,153.43 65.49 41.05 6,411.09 6,350.09 3,576.78 3,193.74 5,964,281.154 679,197.041 0.61 3,193.74 9,247.90 65.39 40.28 6,450.36 6,389.36 3,641.95 3,249.73 5,964,347.618 679,251.485 0.75 3,249.73 9,343.13 65.39 39.26 6,490.02 6,429.02 3,708.50 3,305.11 5,964,415.439 679,305.292 0.97 3,305.11 9,436.42 65.42 39.65 6,528.85 6,467.85 3,773.99 3,359.02 5,964,482.175 679,357.643 0.38 3,359.02 9,531.09 65.49 39.44 6,568.17 6,507.17 3,840.40 3,413.85 5,964,549.843 679,410.897 0.21 3,413.85 9,624.40 65.35 38.85 6,606.99 6,545.99 3,906.21 3,467.41 5,964,616.884 679,462.904 0.59 3,467.41 9,718.66 65.40 38.86 6,646.26 6,585.26 3,972.94 3,521.17 5,964,684.849 679,515.079 0.05 3,521.17 9,812.95 65.32 38.39 6,685.57 6,624.57 4,039.89 3,574.67 5,964,753.036 679,566.990 0.46 3,574.67 9,908.17 65.45 39.06 6,725.24 6,664.24 4,107.43 3,628.82 5,964,821.817 679,619.544 0.65 3,628.82 10,002.84 65.73 39.81 6,764.36 6,703.36 4,174.01 3,683.58 5,964,889.658 679,672.725 0.78 3,683.58 10,097.24 66.79 41.45 6,802.37 6,741.37 4,239.58 3,739.85 5,964,956.528 679,727.439 1.95 3,739.85 10,193.30 66.02 43.10 6,840.82 6,779.82 4,304.72 3,799.06 5,965,023.027 679,785.103 1.77 3,799.06 1/3/2017 4:28:52PM Page 7 COMPASS 5000.1 Build 81B 04) b BP rA.I p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB1 Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey - MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 10,286.68 65.22 45.46 6,879.37 6,818.37 4,365.61 3,858.43 5,965,085.288 679,843.027 2.46 3,858.43 10,381.40 65.65 45.37 6,918.75 6,857.75 4,426.08 3,919.79 5,965,147.177 679,902.944 0.46 3,919.79 10,476.11 65.93 45.43 6,957.58 6,896.58 4,486.73 3,981.29 5,965,209.250 679,963.007 0.30 3,981.29 10,569.67 65.90 45.52 6,995.77 6,934.77 4,546.62 4,042.19 5,965,270.551 680,022.479 0.09 4,042.19 10,664.13 65.90 45.38 7,034.34 6,973.34 4,607.11 4,103.64 5,965,332.460 680,082.489 0.14 4,103.64 10,757.63 63.84 44.46 7,074.04 7,013.04 4,667.05 4,163.41 5,965,393.772 680,140.837 2.38 4,163.41 10,853.14 60.04 43.42 7,118.96 7,057.96 4,727.71 4,221.89 5,965,455.790 680,197.878 4.09 4,221.89 10,947.88 57.26 40.47 7,168.25 7,107.25 4,787.86 4,275.98 5,965,517.179 680,250.540 3.96 4,275.98 11,039.80 53.73 39.27 7,220.32 7,159.32 4,845.97 4,324.54 5,965,576.413 680,297.724 3.99 4,324.54 11,135.27 51.98 36.23 7,277.97 7,216.97 4,906.11 4,371.14 5,965,637.627 680,342.896 3.13 4,371.14 11,228.64 51.31 33.78 7,335.92 7,274.92 4,966.08 4,413.14 5,965,698.552 680,383.479 2.18 4,413.14 11,323.20 50.84 31.00 7,395.34 7,334.34 5,028.18 4,452.55 5,965,761.559 680,421.415 2.34 4,452.55 11,417.12 49.15 29.95 7,455.71 7,394.71 5,090.18 4,489.04 5,965,824.388 680.456.441 1.99 4,489.04 11,512.52 46.22 28.86 7,519.93 7,458.93 5,151.62 4,523.68 5,965,886.619 680,489.635 3.19 4,523.68 11,607.94 43.19 28.33 7,587.74 7,526.74 5,210.54 4,555.81 5,965,946.277 680,520.373 3.20 4,555.81 11,700.55 40.75 26.16 7,656.Sb 7,595.59 `" 5,265.58 4,584.18 5,966,001.960 680,547.445 3.07 4,584.18 11,795.50 37.26 20.32 7,730.39 7,669.39 5,320.38 4,607.84 5,966,057.301 680,569.812 5.33 4,607.84 11,890.04 33.52 15.98 7,807.46 7,746.46 5,372.34 4,624.98 5,966,109.645 680,585.723 4.76 4,624.98 11,984.92 34.83 15.02 7,885.96 7,824.96 5,423.70 4,639.21 5,966,161.318 680,598.749 1.49 4,639.21 12,079.57 34.93 14.55 7,963.61 7,902.61 5,476.04 4,653.02 5,966,213.958 680,611.331 0.30 4,653.02 12,173.85 35.46 17.28 8,040.66 7,979.66 5,528.28 4,667.93 5,966,266.532 680,625.007 1.76 4,667.93 12,268.00 34.76 18.75 8,117.68 8,056.68 5,579.77 4,684.67 5,966,318.401 680,640.535 1.17 4,684.67 12,335.13 34.68 17.99 8,172.85 8,111.85 5,616.06 4,696.72 5,966,354.956 680,651.730 0.66 4,696.72 12,398.00 34.74 17.59 8,224.54 8,163.54 5,650.14 4,707.66 5,966,389.288 680,661.866 0.37 4,707.66 7" 12,409.41 34.75 17.52 8,233.91 8,172.91 5,656.34 4,709.62 5,966,395.532 680,663.682 0.37 4,709.62 12,439.21 34.56 17.51 8,258.42 8,197.42 5,672.50 4,714.72 5,966,411.806 680,668.401 0.64 4,714.72 1/3/2017 4:28:52PM Page 8 COMPASS 5000.1 Build 81B Vbwool BP /G&2 p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB1 Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 Database: EDM R5K- Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 12,470.89 37.18 15.35 8,284.09 8,223.09 5,690.31 4,719.96 5,966,429.726 680,673.221 9.18 4,719.96 12,503.45 40.47 13.47 8,309.46 8,248.46 5,710.08 4,725.02 5,966,449.608 680,677.823 10.73 4,725.02 12,534.30 39.83 12.73 8,333.04 8,272.04 5,729.45 4,729.53 5,966,469.080 680,681.877 2.59 4,729.53 12,567.14 41.78 8.81 8,357.90 8,296.90 5,750.53 4,733.53 5,966,490.242 680,685.376 9.80 4,733.53 12,598.01 45.60 7.12 8,380.22 8,319.22 5,771.64 4,736.47 5,966,511.418 680,687.823 12.94 4,736.47 12,629.48 45.23 7.03 8,402.31 8,341.31 5,793.88 4,739.23 5,966,533.718 680,690.062 1.19 4,739.23 12,661.36 47.37 4.19 8,424.34 8,363.34 5,816.82 4,741.47 5,966,556.695 680,691.766 9.30 4,741.47 12,692.54 51.10 1.51 8,444.69 8,383.69 5,840.39 4,742.63 5,966,580.293 680,692.372 13.62 4,742.63 12,723.54 50.73 1.56 8,464.24 8,403.24 5,864.45 4,743.28 5,966,604.354 680,692.452 1.20 4,743.28 12,755.41 50.67 1.34 8,484.42 8,423.42 5,889.10 4,743.90 5,966,629.015 680,692.499 0.57 4,743.90 12,787.08 53.01 1.18 8,503.99 8,442.99 5,914.00 4,744.45 5,966,653.913 680,692.462 7.40 4,744.45 12,818.21 58.28 0.83 8,521.55 8,460.55 5,939.68 4,744.90 5,966,679.601 680,692.308 16.95 4,744.90 12,850.06 59.27 1.28 8,538.06 8,477.06 5,966.91 4,745.40 5,966,706.835 680,692.172 3.33 4,745.40 12,881.58 62.72 359.99 8,553.34 8,492.34 5,994.47 4,745.70 5,966,734.393 680,691.827 11.52 4,745.70 12,912.00 66.73 359.42 8,566.33 8,505.33 6,021.98 4,745.55 5,966,761.882 680,691.038 13.29 4,745.55 4 1/2" 12,938.02 66.96 0.31 8,576.56 8,515.56 6,045.90 4,745.50 5,966,785.796 680,690.422 3.27 4,745.50 12,969.25 62.70 358.81 8,589.84 8,528.84 6,074.16 4,745.29 5,966,814.038 680,689.549 14.32 4,745.29 13,000.02 65.52 355.30 8,603.28 8,542.28 6,101.79 4,743.86 5,966,841.631 680,687.470 13.76 4,743.86 13,032.34 68.81 354.07 8,615.82 8,554.82 6,131.45 4,741.09 5,966,871.210 680,684.014 10.77 4,741.09 13,062.36 72.07 353.91 8,625.87 8,564.87 6,159.57 4,738.13 5,966,899.259 680,680.394 10.87 4,738.13 13,092.77 75.99 351.48 8,634.24 8,573.24 6,188.56 4,734.41 5,966,928.152 680,675.994 15.01 4,734.41 13,124.60 78.73 351.17 8,641.20 8,580.20 6,219.26 4,729.72 5,966,958.732 680,670.591 8.66 4,729.72 13,156.96 79.16 351.10 8,647.40 8,586.40 6,250.64 4,724.83 5,966,989.987 680,664.963 1.35 4,724.83 13,187.96 79.46 351.23 8,653.16 8,592.16 6,280.74 4,720.15 5,967,019.967 680,659.581 1.05 4,720.15 13,219.79 79.60 351.18 8,658.94 8,597.94 6,311.68 4,715.37 5,967,050.777 680,654.072 0.47 4,715.37 13,251.13 79.81 350.82 8,664.54 8,603.54 6,342.13 4,710.54 5,967,081.109 680,648.536 1.31 4,710.54 1/3/2017 4:28:52PM Page 9 COMPASS 5000.1 Build 81B ft f 046 bp BP RAN Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PS DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB1 Survey Calculation Method: Minimum Curvature Design: 15-16CPB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 13,281.94 80.23 351.08 8,669.88 8,608.886,372.10 4,705.77 5,967,110.953 680,643.063 1.60 4,705.77 15-16CPB1 TIP to 15-16B 13,288.00 80.31 350.92 8,670.90 8,609.90 6,378.00 4,704.84 5,967,116.829 680,641.991 2.92 4,704.84 15-16CPB1 KOP 13,289.50 80.33 350.88 8,671.16 8,610.16 6,379.46 4,704.60 5,967,118.283 680,641.723 2.77 4,704.60 13,309.63 84.22 347.74 8,673.86 8,612.86 6,399.05 4,700.90 5,967,137.784 680,637.564 24.75 4,700.90 15-16CPB1 Interpolated Azimuth 13,337.38 89.01 343.46 8,675.50 8,614.50 6,425.87 4,694.01 5,967,164.430 680,630.050 23.13 4,694.01 15-16CPB1 Interpolated Azimuth 13,367.45 89.97 338.86 8,675.77 8,614.77 6,454.32 4,684.30 5,967,192.643 680,619.679 15.63 4,684.30 13,397.57 89.72 333.17 8,675.85 8,614.85 6,481.83 4,672.07 5,967,219.854 680,606.800 18.91 4,672.07 13,427.65 88.80 326.95 8,676.24 8,615.24 6,507.88 4,657.06 5,967,245.544 680,591.191 20.90 4,657.06 13,457.43 88.31 319.87 8,676.99 8,615.99 6,531.77 4,639.33 5,967,269.009 680,572.903 23.82 4,639.33 13,487.83 87.33 314.24 8,678.15 8,617.15 -' ' 6,553.99 4,618.64 5,967,290.745 680,551.702 18.78 4,618.64 13,517.43 85.75 307.19 8,679.94 8,618.94 6,573.25 4,596.26 5,967,309.475 680,528.880 24.37 4,596.26 13,547.71 85.61 300.46 8,682.22 8,621.22 6,590.05 4,571.19 5,967,325.680 680,503.426 22.17 4,571.19 13,577.65 84.99 293.34 8,684.68 8,623.68 6,603.54 4,544.60 5,967,338.545 680,476.526 23.79 4,544.60 13,607.66 85.64 286.28 8,687.13 8,626.13 6,613.67 4,516.48 5,967,348.011 680,448.176 23.55 4,516.48 13,635.82 85.39 280.36 8,689.34 8,628.34 6,620.14 4,489.17 5,967,353.835 680,420.728 20.98 4,489.17 13,666.20 85.17 276.49 8,691.84 8,630.84 6,624.57 4,459.23 5,967,357.567 680,390.690 12.72 4,459.23 13,694.94 85.11 273.77 8,694.27 8,633.27 6,627.13 4,430.71 5,967,359.458 680,362.120 9.43 4,430.71 13,725.24 86.13 270.61 8,696.59 8,635.59 6,628.29 4,400.52 5,967,359.904 680,331.918 10.93 4,400.52 13,754.79 85.02 267.91 8,698.87 8,637.87 6,627.91 4,371.07 5,967,358.834 680,302.481 9.85 4,371.07 13,785.10 84.25 265.26 8,701.70 8,640.70 6,626.11 4,340.95 5,967,356.332 680,272.413 9.07 4,340.95 13,815.80 85.21 261.32 8,704.52 8,643.52 6,622.54 4,310.59 5,967,352.050 680,242.152 13.16 4,310.59 13,845.18 87.51 258.19 8,706.39 8,645.39 6,617.32 4,281.74 5,967,346.161 680,213.437 13.20 4,281.74 13,874.88 89.17 254.69 8,707.25 8,646.25 6,610.36 4,252.89 5,967,338.528 680,184.755 13.04 4,252.89 13,905.72 89.08 251.72 8,707.72 8,646.72 6,601.46 4,223.37 5,967,328.930 680,155.456 9.63 4,223.37 1/3/2017 4:28:52PM Page 10 COMPASS 5000.1 Build 81B Ubood b BP rel.I p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16CPB1 Design: 15-16CPB1 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 15-16 15-16B @ 61.00usft (Nabors 7ES) 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Survey Measured MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) C) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 13,935.72 86.74 249.06 8,708.81 8,647.81 6,591.40 4,195.14 5,967,318.212 680,127.465 11.80 4,195.14 13,982.00 86.74 249.06 8,711.44 8,650.44 6,574.88 4,151.98 5,967,300.693 680,084.713 0.00 4,151.98 Projection to TD 8,673.86 6,399.05 4,700.90 15-16CPB1 Interpolated Azimuth 13,337.38 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 13,281.94 8,669.88 6,372.10 4,705.77 15-16CPB1 TIP to 15-16B 13,288.00 8,670.90 6,378.00 4,704.84 15-16CPB1 KOP 13,309.63 8,673.86 6,399.05 4,700.90 15-16CPB1 Interpolated Azimuth 13,337.38 8,675.50 6,425.87 4,694.01 15-16CPB1 Interpolated Azimuth 13,982.00 8,711.44 6,574.88 4,151.98 Projection to TD Prepared By: Yosha Ragbirsingh Survey Manager, Baker Hughes 1/3/2017 4.28:52PM Page 11 COMPASS 5000.1 Build 81B KLU`IVE /1ita JAN 12 201' BAKER PRINT DISTRIBUTION LIST HUGHES AOGCC COMPANY BP Exploration Alaska Inc WELL NAME 15-16CPB2 FIELD Prudhoe Bay Unit COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick.Rider(@bakerhughes.com 21 6154 2791 3 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1-132-1 DATA LOGGED 900 E. Benson Blvd. 1 30/207? M K BENDER Anchorage, Alaska 99508 to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE December 28, 2016 TODAYS DATE January 11, 2017 Revision STATUS Final Replacement: No Details: Requested by: COMPANY ADDRESS f FEDEX WILL NOT DELIVER TO P.O. BO$ PERSON ATTENTION FIELD FINAL CDCD LOGS LOGS I (digital/image) Surveys (Final Surveys) # OF PRINTS # Ur NRIN I S # OF COPIES # OF COPIES # OF COPIE 4 4 4 4 4 1 1I BP North Slope 1 0 1 EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 2 �ConocoPhillips Alaska Inc. 0 1 1 Attn: Ricky Elgaricio PO Box 100360 Anchorage, AK 99510 3 Exxon Mobil, Alaska 0 1 0 Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4'I State of Alaska - AOGCC 1 1 1 Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5I DNR - Division of Oil & Gas *** 0 1 1 (Attn: Resource Evaluation 1550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 i *** Stamp "confidential' on all material deliver to DNR 61 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 1900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: Behrooz Raessi TOTALS FOR THIS PAGE: 0 2 4 4 0 0 TOTALS FOR ALL PAGES: 0 2 4 4 0 0 by North America - ALASKA - BP Prudhoe Bay PB DS 15 15-16 15-16CPB2 500292111572 Design: 15-16CPB2 Final Survey Report 03 January, 2017 2l lv 15�-i -7 > BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16CPB2 Design: 15-16CPB2 BP 15-16CPB2 rel.a Final Survey Report Audit Notes: BAKER HUGHES Local Co-ordinate Reference: Well 15-16 Tie On Depth: 13,281.94 TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) +N/ -S MD Reference: 15-16B @ 61.00usft (Nabors 7ES) (usft) North Reference: True Survey Calculation Method: Minimum Curvature 0.00 90.00 Database: EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 * OGP-Usa AK [4267*15864] Using Well Reference Point Map Zone: NAD27 * OGP-Usa AK / Alaska zone 4 [26734*1586, Using geodetic scale factor Site PB DS 15, TR -11-14 Site Position: Northing: 5,958,837.360 usft Latitude: 70° 17' 35.236 N From: Map Easting: 676,296.980 usft Longitude: 148° 34'21.213 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.34 ° Well 15-16,15-16 Well Position +N/ -S 0.00 usft Northing: 5,960,630.760 usft Latitude: 70° 17'52.919 N +E/ -W 0.00 usft Easting: 676,088.190 usft Longitude: 148° 34'26.072 W Position Uncertainty 0.00 usft Wellhead Elevation: 36.02 usft Ground Level: 33.16 usft Wellbore 15-16CPB2 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (I (I (nT) BG G M2016 1/1/2017 18.14 81.02 57,558 Design 15-16CPB2 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 13,281.94 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) V) 24.98 0.00 0.00 90.00 1/3/2017 4:39:30PM Page 2 COMPASS 5000.1 Build 81B Vhood b BP rew.a p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K-Alaska PROD -ANCP1 Survey Program Date 1/3/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 90.00 4,540.00 15-16 Srvy 2 GYD CT CMS (15-16) GYD-CT-CMS Gyrodata cont.casing m/s 4,587.00 4,604.00 15-16BPB1 Srvy 1 Blind (15-16BPB1) BLIND Blind drilling 4,626.54 4,720.47 15-16BPB1 Srvy 2 Inc+Trend (15-16BPB1 INC+TREND Inclinometer+ known azi trend 4,813.93 12,335.13 15-16BPB1 Spry 3 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 12,409.41 12,912.00 15-16BPB1 Srvy 4 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 12,938.02 13,281.94 15-16B Srvy 1 MWD+IFR+MS (15-16B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 13,289.50 15,611.15 15-16CPB2 CTK MWD 4-1/4" (15-16CPB2 MWD MWD - Standard Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 24.98 0.00 0.00 24.98 -36.02 0.00 0.00 5,960,630.760 676,088.190 0.00 0.00 90.00 0.37 179.86 90.00 29.00 -0.21 0.00 5,960,630.550 676,088.195 0.57 0.00 190.00 0.43 158.08 190.00 129.00 -0.88 0.14 5,960,629.883 676,088.352 0.16 0.14 290.00 0.36 180.27 289.99 228.99 -1.54 0.28 5,960,629.224 676,088.506 0.17 0.28 390.00 0.51 168.24 389.99 328.99 -2.29 0.37 5,960,628.476 676,088.613 0.17 0.37 490.00 0.43 179.07 489.99 428.99 -3.10 0.47 5,960,627.668 676,088.729 0.12 0.47 590.00 0.49 164.12 589.99 528.99 -3.89 0.59 5,960,626.885 676,088.870 0.13 0.59 690.00 0.41 178.64 689.98 628.98 -4.66 0.71 5,960,626.119 676,089.014 0.14 0.71 790.00 0.12 121.30 789.98 728.98 -5.07 0.81 5,960,625.709 676,089.121 0.36 0.81 890.00 0.37 81.65 889.98 828.98 -5.08 1.22 5,960,625.711 676,089.530 0.29 1.22 990.00 0.43 85.77 989.98 928.98 -5.00 1.92 5,960,625.802 676,090.222 0.07 1.92 1,090.00 0.32 93.93 1,089.98 1,028.98 -5.00 2.57 5,960,625.826 676,090.874 0.12 2.57 1,190.00 0.30 72.48 1,189.97 1,128.97 -4.94 3.10 5,960,625.898 676,091.401 0.12 3.10 1,290.00 0.40 81.01 1,289.97 1,228.97 -4.80 3.69 5,960,626.045 676,091.992 0.11 3.69 1,390.00 0.40 115.46 1,389.97 1,328.97 -4.90 4.35 5,960,625.965 676,092.654 0.24 4.35 1,490.00 0.31 96.64 1,489.97 1,428.97 -5.08 4.93 5,960,625.797 676,093.242 0.15 4.93 1,590.00 0.46 131.91 1,589.97 1,528.97 -5.38 5.50 5,960,625.511 676,093.816 0.27 5.50 1,690.00 0.41 126.75 1,689.96 1,628.96 -5.86 6.09 5,960,625.043 676,094.413 0.06 6.09 1/3/2017 4:39:30PM Page 3 COMPASS 5000.1 Build 81B Vbp BP Final Survey Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 /has BAKER HUGHES Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 1,790.00 0.28 164.95 1,789.96 1,728.96 -6.31 6.44 5,960,624.601 676,094.773 0.26 6.44 1,890.00 0.34 163.56 1,889.96 1,828.96 -6.83 6.58 5,960,624.085 676,094.933 0.06 6.58 1,990.00 0.53 67.10 1,989.96 1,928.96 -6.94 7.09 5,960,623.992 676,095.445 0.66 7.09 2,090.00 0.64 69.28 2,089.95 2,028.95 -6.56 8.04 5,960,624.392 676,096.384 0.11 8.04 2,190.00 0.60 82.25 2,189.95 2,128.95 -6.29 9.08 5,960,624.684 676,097.419 0.15 9.08 2,290.00 0.86 153.02 2,289.94 2,228.94 -6.89 9.94 5,960,624.106 676,098.292 0.87 9.94 2,390.00 0.96 160.89 2,389.93 2,328.93 -8.35 10.56 5,960,622.661 676,098.941 0.16 10.56 2,485.00 0.89 153.98 2,484.92 2,423.92 -9.77 11.14 5,960,621.258 676,099.559 0.14 11.14 13 3/8" 2,490.00 0.89 153.59 2,489.92 2,428.92 -9.84 11.18 5,960,621.189 676,099.595 0.14 11.18 2,590.00 1.43 24.44 2,589.90 2,528.90 -9.40 12.04 5,960,621.649 676,100.446 2.11 12.04 2,690.00 4.99 19.36 2,689.73 2,628.73 -4.16 14.00 5,960,626.934 676,102.281 3.57 14.00 2,790.00 6.55 12.61 2,789.22 2,728.22 5.51 16.69 5,960,636.664 676,104.741 1.70 16.69 2,890.00 8.25 7.652,888.39 2,827.39 18. J 18.89 5,960,649.389 676,106.644 1.81 18.89 2,990.00 9.99 13.86 2,987.12 2,926.12 337 21.92 5,960,664.988 676,109.312 2.00 21.92 3,090.00 11.39 28.91 '"" 3,085.40 3,024.40 50.85 28.77 5,960,682.212 676,115.763 3.11 28.77 3,190.00 12.85 35.21 3,183.18 3,122.18 68.53 39.96 5,960,700.199 676,126.530 1.97 39.96 3,290.00 13.38 25.23 3,280.58 3,219.58 88.08 51.30 5,960,720.013 676,137.412 2.32 51.30 3,340.00 14.04 24.08 3,329.16 3,268.16 98.85 56.24 5,960,730.896 676,142.099 1.43 56.24 3,390.00 14.79 23.96 3,377.58 3,316.58 110.22 61.31 5,960,742.380 676,146.897 1.50 61.31 3,440.00 15.54 24.87 3,425.84 3,364.84 122.13 66.72 5,960,754.412 676,152.025 1.57 66.72 3,490.00 16.40 26.22 3,473.91 3,412.91 134.54 72.65 5,960,766.956 676,157.668 1.87 72.65 3,540.00 17.20 27.38 3,521.78 3,460.78 147.44 79.17 5,960,780.001 676,163.882 1.73 79.17 3,590.00 18.81 29.52 3,569.33 3,508.33 161.02 86.55 5,960,793.749 676,170.933 3.48 86.55 3,640.00 20.34 30.37 3,616.43 3,555.43 175.53 94.91 5,960,808.453 676,178.956 3.11 94.91 3,690.00 21.45 31.12 3,663.15 3,602.15 190.85 104.03 5,960,823.986 676,187.713 2.28 104.03 3,740.00 22.83 31.56 3,709.46 3,648.46 206.95 113.83 5,960,840.302 676,197.135 2.78 113.83 1/3/2017 4:39:30PM Page 4 COMPASS 5000.1 Build 81B BP riFla Vbp Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 3,790.00 24.12 31.76 3,755.32 3,694.32 223.90 124.29 5,960,857.494 676,207.189 2.58 124.29 3,840.00 25.64 31.75 3,800.68 3,739.68 241.78 135.36 5,960,875.634 676,217.837 3.04 135.36 3,890.00 27.86 31.39 3,845.32 3,784.32 260.96 147.14 5,960,895.078 676,229.162 4.45 147.14 3,940.00 29.43 31.59 3,889.20 3,828.20 281.40 159.66 5,960,915.802 676,241.200 3.15 159.66 3,990.00 31.04 31.61 3,932.40 3,871.40 302.84 172.85 5,960,937.547 676,253.885 3.22 172.85 4,040.00 32.33 31.79 3,974.95 3,913.95 325.18 186.65 5,960,960.207 676,267.158 2.59 186.65 4,090.00 33.53 32.30 4,016.91 3,955.91 348.22 201.07 5,960,983.574 676,281.036 2.46 201.07 4,140.00 34.98 32.84 4,058.24 3,997.24 371.94 216.23 5,961,007.637 676,295.627 2.96 216.23 4,190.00 36.31 33.17 4,098.87 4,037.87 396.37 232.10 5,961,032.435 676,310.922 2.69 232.10 4,240.00 38.51 33.62 4,138.58 4,077.58 421.73 248.82 5,961,058.175 676,327.043 4.43 248.82 4,290.00 40.39 33.70 4,177.19 4,116.19 448.17 266.43 5,961,085.021 676,344.026 3.76 266.43 4,340.00 42.01 33.81 4,214.81 4,153.81 475.55 284.73 5,961,112.822 676,361.678 3.24 284.73 4,390.00 43.50 33.74 4,251.52 4,190.52 503.77 303.60 5,961,141.468 676,379.880 2.98 303.60 4,440.00 44.46 33.81 4,287.50 4,226.50 '" 532.6 322.90 5,961,170.771 676,398.499 1.92 322.90 4,490.00 45.45 33.90 4,322.88 4,261.88 561.96 342.58 5,961,200.559 676,417.486 1.98 342.58 4,540.00 47.24 34.25 4,357.40 4,296.40 591.9 362.85 5,961,230.986 676,437.045 3.62 362.85 4,587.00 49.09 34.55 4,388.74 4,327.74 620.82 382.63 5,961,260.332 676,456.146 3.96 382.63 9 5/8" 4,604.00 49.90 37.00 4,399.79 4,338.79 631.30 390.19 5,961,270.990 676,463.455 11.95 390.19 4,626.54 49.22 38.00 4,414.41 4,353.41 644.91 400.63 5,961,284.840 676,473.575 4.53 400.63 4,720.47 51.78 43.80 4,474.18 4,413.18 699.60 448.10 5,961,340.626 676,519.742 5.49 448.10 4,813.93 56.37 48.05 4,529.02 4,468.02 752.16 502.49 5,961,394.434 676,572.886 6.14 502.49 4,906.86 59.65 44.78 4,578.25 4,517.25 806.51 559.53 5,961,450.102 676,628.638 4.62 559.53 5,003.33 62.85 48.04 4,624.66 4,563.66 864.78 620.80 5,961,509.787 676,688.516 4.45 620.80 5,096.00 65.42 41.60 4,665.11 4,604.11 923.91 679.49 5,961,570.279 676,745.804 6.84 679.49 5,193.19 66.05 41.60 4,705.05 4,644.05 990.17 738.32 5,961,637.892 676,803.058 0.65 738.32 5,286.33 66.86 41.77 4,742.26 4,681.26 1,053.94 795.10 5,961,702.967 676,858.329 0.89 795.10 1/3/2017 4:39:30PM Page 5 COMPASS 5000.1 Build 81B Vbbood BP riFlu p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 5,378.55 66.00 40.77 4,779.14 4,718.14 1,117.46 850.86 5,961,767.779 676,912.576 1.36 850.86 5,472.62 64.46 39.04 4,818.55 4,757.55 1,182.98 905.65 5,961,834.553 676,965.820 2.34 905.65 5,570.80 65.40 38.90 4,860.15 4,799.15 1,252.12 961.58 5,961,904.981 677,020.109 0.97 961.58 5,666.46 63.33 38.54 4,901.54 4,840.54 1,319.40 1,015.53 5,961,973.506 677,072.460 2.19 1,015.53 5,757.98 63.20 38.03 4,942.71 4,881.71 1,383.56 1,066.17 5,962,038.828 677,121.581 0.52 1,066.17 5,852.93 63.06 39.82 4,985.63 4,924.63 1,449.45 1,119.38 5,962,105.942 677,173.232 1.69 1,119.38 5,947.04 63.90 43.51 5,027.66 4,966.66 1,512.33 1,175.36 5,962,170.116 677,227.712 3.62 1,175.36 6,041.27 64.55 44.66 5,068.63 5,007.63 1,573.28 1,234.39 5,962,232.428 677,285.300 1.30 1,234.39 6,136.26 64.38 47.07 5,109.59 5,048.59 1,632.96 1,295.90 5,962,293.529 677,345.389 2.30 1,295.90 6,230.93 65.05 46.45 5,150.02 5,089.02 1,691.60 1,358.26 5,962,353.611 677,406.351 0.92 1,358.26 6,259.71 65.49 46.48 5,162.06 5,101.06 1,709.61 1,377.21 5,962,372.054 677,424.873 1.53 1,377.21 6,318.80 67.15 45.22 5,185.79 5,124.79 1,747.30 1,416.03 5,962,410.645 677,462.800 3.42 1,416.03 6,368.92 63.86 46.23 5,206.57 5,145.57 1,779.14 1,448.68 5,962,443.237 677,494.691 6.82 1,448.68 6,410.76 61.23 46.69 5,225.86 5,164.86 1,804.71 1,475.59 5,962,469.434 677,520.992 6.36 1,475.59 6,504.67 61.20 47.28 5,271.08 5,210.08 1,860.86 1,535.77 5,962,526.973 677,579.836 0.55 1,535.77 6,596.18 61.28 48.08 5,315.11 5,254.11 1,914.87 1,595.08 5,962,582.354 677,637.865 0.77 1,595.08 6,699.05 61.46 47.28 5,364.40 5,303.40 1,975.66 1,661.84 5,962,644.689 677,703.179 0.70 1,661.84 6,796.68 61.11 47.94 5,411.31 5,350.31 2,033.39 1,725.08 5,962,703.876 677,765.043 0.69 1,725.08 6,886.49 61.53 47.54 5,454.41 5,393.41 2,086.37 1,783.39 5,962,758.211 677,822.094 0.61 1,783.39 6,980.91 60.83 46.42 5,499.93 5,438.93 2,142.81 1,843.88 5,962,816.045 677,881.233 1.28 1,843.88 7,075.82 62.24 46.48 5,545.16 5,484.16 2,200.29 1,904.35 5,962,874.927 677,940.337 1.49 1,904.35 7,170.28 61.35 44.92 5,589.81 5,528.81 2,258.43 1,963.92 5,962,934.436 677,998.532 1.73 1,963.92 7,264.26 61.13 43.53 5,635.03 5,574.03 2,317.46 2,021.39 5,962,994.798 678,054.591 1.32 2,021.39 7,357.92 64.10 44.99 5,678.10 5,617.10 2,377.00 2,079.43 5,963,055.680 678,111.219 3.46 2,079.43 7,453.73 66.20 45.16 5,718.37 5,657.37 2,438.40 2,140.98 5,963,118.491 678,171.312 2.20 2,140.98 7,548.68 66.40 45.16 5,756.53 5,695.53 2,499.70 2,202.63 5,963,181.220 678,231.504 0.21 2,202.63 7,643.91 66.66 45.51 5,794.46 5,733.46 2,561.10 2,264.76 5,963,244.059 678,292.171 0.43 2,264.76 1/312017 4:39:30PM Page 6 COMPASS 5000.1 Build 81B BP rel FAa Vbp Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 7,734.70 66.23 45.30 5,830.74 5,769.74 2,619.54 2,324.02 5,963,303.859 678,350.045 0.52 2,324.02 7,829.73 66.95 45.54 5,868.50 5,807.50 2,680.75 2,386.14 5,963,366.505 678,410.706 0.79 2,386.14 7,924.91 66.18 45.79 5,906.35 5,845.35 2,741.78 2,448.60 5,963,428.977 678,471.717 0.84 2,448.60 8,022.53 66.32 45.30 5,945.67 5,884.67 2,804.35 2,512.38 5,963,493.028 678,534.009 0.48 2,512.38 8,116.99 65.94 44.40 5,983.89 5,922.89 2,865.59 2,573.30 5,963,555.673 678,593.473 0.96 2,573.30 8,210.59 65.92 43.97 6,022.07 5,961.07 2,926.88 2,632.86 5,963,618.331 678,651.581 0.42 2,632.86 8,303.68 66.06 43.13 6,059.94 5,998.94 2,988.51 2,691.45 5,963,681.314 678,708.705 0.84 2,691.45 8,397.95 65.51 42.44 6,098.61 6,037.61 3,051.60 2,749.85 5,963,745.758 678,765.605 0.89 2,749.85 8,490.59 65.38 41.74 6,137.11 6,076.11 3,114.13 2,806.33 5,963,809.589 678,820.601 0.70 2,806.33 8,584.52 65.53 39.71 6,176.13 6,115.13 3,178.88 2,862.07 5,963,875.621 678,874.806 1.97 2,862.07 8,678.96 65.55 38.62 6,215.24 6,154.24 3,245.53 2,916.36 5,963,943.520 678,927.516 1.05 2,916.36 8,776.77 65.64 38.11 6,255.65 6,194.65 3,315.37 2,971.64 5,964,014.629 678,981.143 0.48 2,971.64 8,872.08 65.77 39.26 6,294.87 6,233.87 3,383.18 3,025.94 5,964,083.686 679,033.832 1.11 3,025.94 8,966.07 65.72 40.92 6,333.48 6,272.48 31448.7 3,081.12 5,964,150.512 679,087.460 1.61 3,081.12 9,059.53 65.45 41.68 6,372.11 6,311.11 �! 3,512.1617 3,137.29 5,964,215.740 679,142.110 0.79 3,137.29 9,153.43 65.49 41.05 �` "6,411.09 6,350.09 3,57678 3,193.74 5,964,281.154 679,197.041 0.61 3,193.74 9,247.90 65.39 40.28 6,450.36 6,389.36 3,641.95 3,249.73 5,964,347.618 679,251.485 0.75 3,249.73 9,343.13 65.39 39.26 6,490.02 6,429.02 3,708.50 3,305.11 5,964,415.439 679,305.292 0.97 3,305.11 9,436.42 65.42 39.65 6,528.85 6,467.85 3,773.99 3,359.02 5,964,482.175 679,357.643 0.38 3,359.02 9,531.09 65.49 39.44 6,568.17 6,507.17 3,840.40 3,413.85 5,964,549.843 679,410.897 0.21 3,413.85 9,624.40 65.35 38.85 6,606.99 6,545.99 3,906.21 3,467.41 5,964,616.884 679,462.904 0.59 3,467.41 9,718.66 65.40 38.86 6,646.26 6,585.26 3,972.94 3,521.17 5,964,684.849 679,515.079 0.05 3,521.17 9,812.95 65.32 38.39 6,685.57 6,624.57 4,039.89 3,574.67 5,964,753.036 679,566.990 0.46 3,574.67 9,908.17 65.45 39.06 6,725.24 6,664.24 4,107.43 3,628.82 5,964,821.817 679,619.544 0.65 3,628.82 10,002.84 65.73 39.81 6,764.36 6,703.36 4,174.01 3,683.58 5,964,889.658 679,672.725 0.78 3,683.58 10,097.24 66.79 41.45 6,802.37 6,741.37 4,239.58 3,739.85 5,964,956.528 679,727.439 1.95 3,739.85 10,193.30 66.02 43.10 6,840.82 6,779.82 4,304.72 3,799.06 5,965,023.027 679,785.103 1.77 3,799.06 1/3/2017 4:39:30PM Page 7 COMPASS 5000.1 Build 81B �.J BP //.t1 p Final Survey Report BAKER HUGHES Company: NorthAmerica- ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61,00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) (usft) (°) (°) 10,286.68 65.22 45.46 10,381.40 65.65 45.37 10,476.11 65.93 45.43 10,569.67 65.90 45.52 10,664.13 65.90 45.38 10,757.63 63.84 44.46 10,853.14 60.04 43.42 10,947.88 57.26 40.47 11,039.80 53.73 39.27 11,135.27 51.98 36.23 11,228.64 51.31 33.78 11,323.20 50.84 31.00 11,417.12 49.15 29.95 11,512.52 46.22 28.86 11,607.94 43.19 28.33 11,700.55 40.75 26.16 11,795.50 37.26 20.32 11,890.04 33.52 15.98 11,984.92 34.83 15.02 12,079.57 34.93 14.55 12,173.85 35.46 17.28 12,268.00 34.76 18.75 12,335.13 34.68 17.99 12,398.00 34.74 17.59 7' 4,275.98 7,220.32 12,409.41 34.75 17.52 12,439.21 34.56 17.51 TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 6,879.37 6,818.37 4,365.61 3,858.43 5,965,085.288 679,843.027 2.46 3,858.43 6,918.75 6,857.75 4,426.08 3,919.79 5,965,147.177 679,902.944 0.46 3,919.79 6,957.58 6,896.58 4,486.73 3,981.29 5,965,209.250 679,963.007 0.30 3,981.29 6,995.77 6,934.77 4,546.62 4,042.19 5,965,270.551 680,022.479 0.09 4,042.19 7,034.34 6,973.34 4,607.11 4,103.64 5,965,332.460 680,082.489 0.14 4,103.64 7,074.04 7,013.04 4,667.05 4,163.41 5,965,393.772 680,140.837 2.38 4,163.41 7,118.96 7,057.96 4,727.71 4,221.89 5,965,455.790 680,197.878 4.09 4,221.89 7,168.25 7,107.25 4,787.86 4,275.98 5,965,517.179 680,250.540 3.96 4,275.98 7,220.32 7,159.32 4,845.97 4,324.54 5,965,576.413 680,297.724 3.99 4,324.54 7,277.97 7,216.97 4,906.11 4,371.14 5,965,637.627 680,342.896 3.13 4,371.14 7,335.92 7,274.92 4,966.08 4,413.14 5,965,698.552 680,383.479 2.18 4,413.14 7,395.34 7,334.34 5,028.18 4,452.55 5,965,761.559 680,421.415 2.34 4,452.55 7 455 7fi 7 e94.71 5,090. A-4,89.04 5,965,824.388 680,456.441 1.99 4,489.04 7,519 4'3 a 758.93 5,151. 4,523.68 5,965,886.619 680,489.635 3.19 4,523.68 7,587.7 76.74 5,210.1 41555.81 5,965,946.277 680,520.373 3.20 4,555.81 7,656.59 7;595.59 5,265.58 4,584.18 5,966,001.960 680,547.445 3.07 4,584.18 7,730.39 7,669.39 5,320.38 4,607.84 5,966,057.301 680,569.812 5.33 4,607.84 7,807.46 7,746.46 5,372.34 4,624.98 5,966,109.645 680,585.723 4.76 4,624.98 7,885.96 7,824.96 5,423.70 4,639.21 5,966,161.318 680,598.749 1.49 4,639.21 7,963.61 7,902.61 5,476.04 4,653.02 5,966,213.958 680,611.331 0.30 4,653.02 8,040.66 7,979.66 5,528.28 4,667.93 5,966,266.532 680,625.007 1.76 4,667.93 8,117.68 8,056.68 5,579.77 4,684.67 5,966,318.401 680,640.535 1.17 4,684.67 8,172.85 8,111.85 5,616.06 4,696.72 5,966,354.956 680,651.730 0.66 4,696.72 8,224.54 8,163.54 5,650.14 4,707.66 5,966,389.288 680,661.866 0.37 4,707.66 8,233.91 8,172.91 5,656.34 4,709.62 5,966,395.532 680,663.682 0.37 4,709.62 8,258.42 8,197.42 5,672.50 4,714.72 5,966,411.806 680,668.401 0.64 4,714.72 1/3/2017 4:39:30PM Page 8 COMPASS 5000.1 Build 81B BP rel Fag by Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16CPB2 Design: 15-16CPB2 Survey MD (usft) 12,470.89 12, 503.45 12,534.30 12,567.14 12,598.01 12,629.48 12,661.36 12,692.54 12,723.54 12,755.41 12,787.08 12,818.21 12,850.06 12,881.58 12,912.00 4 1/2" 12,938.02 12,969.25 13,000.02 13,032.34 13, 062.36 13, 092.77 13,124.60 13,156.96 13,187.96 13,219.79 13,251.13 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 15-16 15-16B @ 61.00usft (Nabors 7ES) 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg 4,745.50 62.70 (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) 37.18 15.35 8,284.09 8,223.09 5,690.31 4,719.96 5,966,429.726 680,673.221 9.18 40.47 13.47 8,309.46 8,248.46 5,710.08 4,725.02 5,966,449.608 680,677.823 10.73 39.83 12.73 8,333.04 8,272.04 5,729.45 4,729.53 5,966,469.080 680,681.877 2.59 41.78 8.81 8,357.90 8,296.90 5,750.53 4,733.53 5,966,490.242 680,685.376 9.80 45.60 7.12 8,380.22 8,319.22 5,771.64 4,736.47 5,966,511.418 680,687.823 12.94 45.23 7.03 8,402.31 8,341.31 5,793.88 4,739.23 5,966,533.718 680,690.062 1.19 47.37 4.19 8,424.34 8,363.34 5,816.82 4,741.47 5,966,556.695 680,691.766 9.30 51.10 1.51 8,444.69 8,383.69 5,840.39 4,742.63 5,966,580.293 680,692.372 13.62 50.73 1.56 8,464.24 8,403.24 5,864.45 4,743.28 5,966,604.354 680,692.452 1.20 50.67 1.34 8,484.42 8,423.42 5,889.10 4,743.90 5,966,629.015 680,692.499 0.57 53.01 1.18 8,503.99 8,442.99 5,914.00 4,744.45 5,966,653.913 680,692.462 7.40 58.28 0.83 8,521.55 8,460.55 5,939.68 4,744.90 5,966,679.601 680,692.308 16.95 59.27 1.28 8,538.06 8,477.06 5,966.91 4,745.40 5,966,706.835 680,692.172 3.33 62.72 359.99 8,553.34 8,492.34 5,994.4,§ 4,745.70 5,966,734.393 680,691.827 11.52 66.73 359.42 8,566.33 8,505.33i 6 021 4 4,745.55 5,966,761.882 680,691.038 13.29 V. Sec (usft) 4,719.96 4,725.02 4,729.53 4,733.53 4,736.47 4,739.23 4,741.47 4,742.63 4,743.28 4,743.90 4,744.45 4,744.90 4,745.40 4,745.70 4,745.55 66.96 0.31 8,576.56 8,515.56 6,045.90 4,745.50 5,966,785.796 680,690.422 3.27 4,745.50 62.70 358.81 8,589.84 8,528.84 6,074.16 4,745.29 5,966,814.038 680,689.549 14.32 4,745.29 65.52 355.30 8,603.28 8,542.28 6,101.79 4,743.86 5,966,841.631 680,687.470 13.76 4,743.86 68.81 354.07 8,615.82 8,554.82 6,131.45 4,741.09 5,966,871.210 680,684.014 10.77 4,741.09 72.07 353.91 8,625.87 8,564.87 6,159.57 4,738.13 5,966,899.259 680,680.394 10.87 4,738.13 75.99 351.48 8,634.24 8,573.24 6,188.56 4,734.41 5,966,928.152 680,675.994 15.01 4,734.41 78.73 351.17 8,641.20 8,580.20 6,219.26 4,729.72 5,966,958.732 680,670.591 8.66 4,729.72 79.16 351.10 8,647.40 8,586.40 6,250.64 4,724.83 5,966,989.987 680,664.963 1.35 4,724.83 79.46 351.23 8,653.16 8,592.16 6,280.74 4,720.15 5,967,019.967 680,659.581 1.05 4,720.15 79.60 351.18 8,658.94 8,597.94 6,311.68 4,715.37 5,967,050.777 680,654.072 0.47 4,715.37 79.81 350.82 8,664.54 8,603.54 6,342.13 4,710.54 5,967,081.109 680,648.536 1.31 4,710.54 1/312017 4:39:30PM Page 9 COMPASS 5000.1 Build 81B :rvhood b BP rMARG p Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 13,281.94 80.23 351.08 8,669.88 8,608.88 6,372.10 4,705.77 5,967,110.953 680,643.063 1.60 4,705.77 13,289.50 80.33 350.88 8,671.16 8,610.16 6,379.46 4,704.60 5,967,118.283 680,641.723 2.89 4,704.60 13,309.63 84.22 347.74 8,673.86 8,612.86 6,399.05 4,700.90 5,967,137.784 680,637.564 24.75 4,700.90 13,337.38 89.01 343.46 8,675.50 8,614.50 6,425.87 4,694.01 5,967,164.430 680,630.050 23.13 4,694.01 13,367.45 89.97 338.86 8,675.77 8,614.77 6,454.32 4,684.31 5,967,192.643 680,619.680 15.63 4,684.31 13,397.57 89.72 333.17 8,675.85 8,614.85 6,481.83 4,672.07 5,967,219.854 680,606.801 18.91 4,672.07 13,427.65 88.80 326.95 8,676.24 8,615.24 6,507.88 4,657.06 5,967,245.544 680,591.192 20.90 4,657.06 13,457.43 88.31 319.87 8,676.99 8,615.99 6,531.77 4,639.33 5,967,269.009 680,572.904 23.82 4,639.33 13,487.83 87.33 314.24 8,678.15 8,617.15 6,553.99 4,618.64 5,967,290.745 680,551.702 18.78 4,618.64 13,517.43 85.75 307.19 8,679.94 8,618.94 6,573.25 4,596.26 5,967,309.475 680,528.880 24.37 4,596.26 13,547.71 85.61 300.46 8,682.22 8,621.22 6,590.05 4,571.19 5,967,325.680 680,503.426 22.17 4,571.19 13,577.65 84.99 293.34 8,684.68 8,623.68 6,603.54 4,544.60 5,967,338.545 680,476.526 23.79 4,544.60 13,607.66 85.64 286.28 8,626.13 6,613.67 4,516.48 5,967,348.011 680,448.177 23.55 4,516.48 _8,687.13 13,610.00 85.62 285.79 8,687.31 8,626.31 6,614.32 4,514.24 5,967,348.603 680,445.920 20.99 4,514.24 15-16CPB2 TIP to 15-16CPB1 13,635.27 89.51 286.85 8,688.38 8,627.38 6,621.41 4,490.01 5,967,355.126 680,421.537 15.97 4,490.01 15-16CPB2 KOP- Billet 13,665.51 91.41 284.39 8,688.14 8,627.14 6,629.55 4,460.89 5,967,362.582 680,392.237 10.28 4,460.89 13,696.02 90.31 281.37 8,687.68 8,626.68 6,636.35 4,431.16 5,967,368.682 680,362.353 10.53 4,431.16 13,725.56 89.88 277.50 8,687.63 8,626.63 6,641.19 4,402.02 5,967,372.840 680,333.115 13.18 4,402.02 13,755.42 90.03 273.98 8,687.66 8,626.66 6,644.18 4,372.32 5,967,375.128 680,303.349 11.80 4,372.32 13,785.50 89.91 270.63 8,687.67 8,626.67 6,645.39 4,342.27 5,967,375.634 680,273.280 11.14 4,342.27 13,815.66 89.82 266.71 8,687.74 8,626.74 6,644.69 4,312.12 5,967,374.228 680,243.160 13.00 4,312.12 13,845.44 90.15 263.03 8,687.75 8,626.75 6,642.03 4,282.46 5,967,370.871 680,213.577 12.41 4,282.46 13,875.71 88.68 258.37 8,688.06 8,627.06 6,637.14 4,252.60 5,967,365.283 680,183.840 16.14 4,252.60 13,905.42 89.36 253.77 8,688.57 8,627.57 6,629.99 4,223.78 5,967,357.461 680,155.194 15.65 4,223.78 13,935.63 90.98 250.90 8,688.48 8,627.48 6,620.82 4,195.00 5,967,347.624 680,126.637 10.91 4,195.00 1/3/2017 4:39:30PM Page 10 COMPASS 5000.1 Build 81B boom Vbp BPr�.2 Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 13,965.58 89.85 247.08 8,688.26 8,627.26 6,610.09 4,167.04 5,967,336.237 680,098.945 13.30 4,167.04 13,995.54 89.14 241.90 8,688.53 8,627.53 6,597.19 4,140.02 5,967,322.710 680,072.228 17.45 4,140.02 14,025.43 90.34 238.91 8,688.66 8,627.66 6,582.43 4,114.03 5,967,307.347 680,046.596 10.78 4,114.03 14,057.01 92.80 238.35 8,687.80 8,626.80 6,566.00 4,087.08 5,967,290.289 680,020.038 7.99 4,087.08 14,085.50 92.92 242.26 8,686.38 8,625.38 6,551.90 4,062.37 5,967,275.622 679,995.664 13.71 4,062.37 14,114.17 92.27 245.99 8,685.08 8,624.08 6,539.41 4,036.60 5,967,262.526 679,970.201 13.19 4,036.60 14,146.26 92.67 252.00 8,683.69 8,622.69 6,527.92 4,006.68 5,967,250.342 679,940.564 18.75 4,006.68 14,180.68 89.97 255.77 8,682.90 8,621.90 6,518.37 3,973.63 5,967,240.023 679,907.749 13.47 3,973.63 14,210.74 90.55 257.60 8,682.76 8,621.76 6,511.45 3,944.38 5,967,232.417 679,878.671 6.39 3,944.38 14,240.61 89.94 262.09 8,682.64 8,621.64 6,506.18 3,914.99 5,967,226.465 679,849.411 15.17 3,914.99 14,275.63 88.96 266.57 8,682.97 8,621.97 6,502.73 3,880.15 5,967,222.191 679,814.666 13.09 3,880.15 14,305.96 89.05 271.22 8,683.50 8,622.50 6,502.14 3,849.84 5,967,220.897 679,784.378 15.33 3,849.84 14,335.85 88.99 275.71 8,684.01 8,623.01 6,503.95 3,820.02 5,967,222.003 679,754.523 15.02 3,820.02 14,365.93 87.85 280.44 8,684.84 8,623.84 " 6,508.17 3,790.26 5,967,225.526 679,724.672 16.17 3,790.26 r � 14,395.89 86.22 284.95 8,686.39 8,625.39 ' 6,514.74 3,761.08 5,967,231.413 679,695.348 15.99 3,761.08 14,426.00 85.42 289.68 8,688.59 8,627.59 6,523.68 3,732.42 5,967,239.673 679,666.488 15.89 3,732.42 14,455.62 84.50 294.21 8,691.19 8,630.19 6,534.70 3,705.05 5,967,250.051 679,638.878 15.55 3,705.05 14,485.47 85.64 295.86 8,693.76 8,632.76 6,547.28 3,678.11 5,967,262.000 679,611.649 6.70 3,678.11 14,515.70 85.60 292.31 8,696.06 8,635.06 6,559.58 3,650.60 5,967,273.650 679,583.857 11.71 3,650.60 14,551.09 84.94 288.79 8,698.98 8,637.98 6,571.96 3,617.58 5,967,285.251 679,550.558 10.09 3,617.58 14,575.38 84.13 286.41 8,701.30 8,640.30 6,579.27 3,594.53 5,967,292.019 679,527.349 10.31 3,594.53 14,630.54 85.72 281.55 8,706.18 8,645.18 6,592.54 3,541.23 5,967,304.032 679,473.757 9.24 3,541.23 14,660.98 85.94 278.04 8,708.39 8,647.39 6,597.70 3,511.32 5,967,308.493 679,443.734 11.52 3,511.32 14,690.35 84.62 276.44 8,710.81 8,649.81 6,601.39 3,482.29 5,967,311.501 679,414.622 7.05 3,482.29 14,720.40 86.59 273.49 8,713.11 8,652.11 6,603.98 3,452.44 5,967,313.392 679,384.727 11.78 3,452.44 14,749.66 87.39 269.54 8,714.65 8,653.65 6,604.75 3,423.24 5,967,313.480 679,355.516 13.76 3,423.24 14,780.91 89.17 265.79 8,715.59 8,654.59 6,603.48 3,392.03 5,967,311.476 679,324.353 13.28 3,392.03 1/3/2017 4:39:30PM Page 11 COMPASS 5000.1 Build 81B JoAkb BP F/.Fag pFinal Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16CPB2 Survey Calculation Method: Minimum Curvature Design: 15-16CPB2 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) � 14,811.78 89.08 261.78 8,716.06 8,655.06 6,600.14 3,361.36 5,967,307.418 679,293.763 12.99 3,361.36 14,840.88 91.72 261.11 8,715.86 8,654.86 6,595.81 3,332.58 5,967,302.417 679,265.101 9.36 3,332.58 14,877.98 90.92 257.70 8,715.00 8,654.00 6,588.99 3,296.13 5,967,294.746 679,228.821 9.44 3,296.13 14,901.18 90.15 254.13 8,714.79 8,653.79 6,583.35 3,273.63 5,967,288.576 679,206.463 15.74 3,273.63 14,931.75 90.49 249.62 8,714.62 8,653.62 6,573.84 3,244.59 5,967,278.391 679,177.651 14.79 3,244.59 14,960.64 90.61 247.27 8,714.34 8,653.34 6,563.23 3,217.72 5,967,267.153 679,151.042 8.14 3,217.72 14,991.38 89.97 250.69 8,714.18 8,653.18 6,552.20 3,189.03 5,967,255.460 679,122.621 11.32 3,189.03 15,027.88 88.56 256.20 8,714.65 8,653.65 6,541.81 3,154.06 5,967,244.249 679,087.906 15.58 3,154.06 15,055.91 86.37 256.65 8,715.89 8,654.89 6,535.24 3,126.84 5,967,237.041 679,060.851 7.98 3,126.84 15,080.69 87.67 260.80 8,717.18 8,656.18 6,530.40 3,102.58 5,967,231.637 679,036.710 17.53 3,102.58 15,129.29 87.29 269.60 8,719.32 8,658.32 6,526.34 3,054.25 5,967,226.447 678,988.486 18.11 3,054.25 15,167.14 86.93 275.35 8,721.23 8,660.23 6,527.97 3,016.50 5,967,227.193 678,950.710 15.20 3,016.50 15,191.03 87.02 279.05 8,722.49 8,661.49 6,530.96 2,992.83 5,967,229.627 678,926.984 15.47 2,992.83 15,240.05 88.28 287.32 8,724.51 8,663.51 6,542.12 2,945.19 5,967,239.671 678,879.094 17.05 2,945.19 15,271.13 88.52 293.11 8,725.37 8,664.37 6,552.86 2,916.04 5,967,249.715 678,849.710 18.64 2,916.04 15,306.19 88.31 299.55 8,726.34 8,665.34 " 6,568.39 2,884.65 5,967,264.511 678,817.963 18.37 2,884.65 15,340.87 87.39 305.22 8,727.65 8,666.65 6,586.95 2,855.40 5,967,282.372 678,788.285 16.55 2,855.40 15,372.09 86.99 307.54 8,729.18 8,668.18 6,605.44 2,830.29 5,967,300.272 678,762.756 7.53 2,830.29 15,400.69 88.83 304.69 8,730.22 8,669.22 6,622.28 2,807.21 5,967,316.568 678,739.284 11.86 2,807.21 15,435.95 95.35 303.64 8,728.94 8,667.94 6,642.06 2,778.07 5,967,335.657 678,709.691 18.73 2,778.07 15,466.06 94.06 301.87 8,726.47 8,665.47 6,658.29 2,752.83 5,967,351.295 678,684.084 7.26 2,752.83 15,495.92 93.56 299.97 8,724.48 8,663.48 6,673.60 2,727.27 5,967,365.999 678,658.175 6.57 2,727.27 15,525.49 90.18 296.21 8,723.52 8,662.52 6,687.51 2,701.21 5,967,379.294 678,631.793 17.09 2,701.21 15,556.05 93.32 294.03 8,722.58 8,661.58 6,700.48 2,673.56 5,967,391.607 678,603.847 12.51 2,673.56 15,586.19 95.75 291.34 8,720.20 8,659.20 6,712.07 2,645.84 5,967,402.540 678,575.869 12.01 2,645.84 15,611.15 99.68 291.20 8,716.85 8,655.85 6,721.04 2,622.80 5,967,410.968 678,552.622 15.75 2,622.80 1/3/2017 4:39:30PM Page 12 COMPASS 5000.1 Build 81B BP Fled .I by Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16CPB2 Design: 15-16CPB2 Local Co-ordinate Reference: Well 15-16 TVD Reference: 15-16B @ 61.00usft (Nabors 7ES) MD Reference: 15-16B @ 61.00usft (Nabors 7ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Survey 7 MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (1) (1 (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 15,650.00 99.68 291.20 8,710.32 8,649.32 6,734.89 2,587.09 5,967,423.976 678,516.605 0.00 2,587.09 Projection to TD I Design Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 13,610.00 8,687.31 6,614.32 4,514.24 15-16CPB2 TIP to 15-16CPB1 13,635.27 8,688.38 6,621.41 4,490.01 15-16CPB2 KOP- Billet 15,650.00 8,710.32 6,734.89 2,587.09 Projection to TD Prepared By: Yosha Ragbirsingh Survey Manager, Baker Hughes 1/3/2017 4:39:30PM Page 13 COMPASS 5000.1 Build 81B A wal GOVERNOR BILL WALKER John Egbejimba Drilling Supervisor BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.alaska.gov Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 15-16C BP Exploration (Alaska), Inc. Permit to Drill Number: 216-154 Surface Location: 854' FNL, 165' FWL, SEC. 22, TI IN, R14E, UM Bottomhole Location: 427' FSL, 2268' FWL, SEC. 10, TI IN, R14E, UM Dear Mr. Egbej imba: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Commissioner 7 DATED this day of November, 2016. RECEIVED STATE OF ALASKA 1SKA OIL AND GAS CONSERVATION COMMIS NOV 10 2015 PERMIT TO DRILL 20 AAC 25.005 la. Type of Work: 1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well ! proposed for: Drill ❑ Lateral ❑ Stratigraphic Test ❑ Development - Oil 0 • Service - Winj ❑ Single Zone 0 ' Coalbed Gas ❑ Gas Hydrates ❑ Redrill H • Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket 0 Single Well ❑ 11- Well Name and Number: BP Exploration (Alaska), Inc Bond No. 29S105380 • PBU 15-16C 3 Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 16097' - TVD: 8674'ss - PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): ADL 028306 & 028303 Surface: 854' FNL, 165' FWL, Sec. 22, T11N, R14E, UM 8. Land Use Permit: 13. Approximate spud date: Top of Productive Horizon: 224' FSL, 4882' FWL, Sec. 10, T1 1N, R14E, UM 78-084 December 15, 2016 9. Acres in Property: 2560 14. Distance to Nearest Property: Total Depth: 427' FSL, 2268' FWL, Sec. 10, T11 N, RUE, UM 20800 - 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 61 feet 15. Distance to Nearest Well Open Surface: x- 676088 • y- 5960631 Zone - ASP 4 GL Elevation above MSL: 32.8 feet to Same Pool: 4 16. Deviated wells: Kickoff Depth: 13300 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 95 degrees Downhole: 3390 , Surface: 2532 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casinq Weiqht Grade Coudina Length MD TVD MID TVD(including stage data 4-1/4" 3-1/2"x3-1/4" 9.2#/6.4# L-80 STL/TC-II 3467' 12600' 8321'ss 16097' 8674'ss 162 sx Class'G' x2-7/8" /6.2# ISTIL 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): 1 Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 1 15634 8641 14555 14555 8689 15533 Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20" 1910# Poleset 29-109 29-109 Surface 2467 13-3/8" 1900 sx Permafrost 'E', 400 sx PF 'C' 28-2495 28-2495 Intermediate 4562 9-5/8" 500 sx Class'G', 300 sx PF 'C' 25-4587 25-4389 Liner 7956 7" 174 sx Class'G' 4440 - 12396 4288-8223 Liner 3413 4-1/2" 413 sx Class'G' 12217 - 15630 8076-8641 Perforation Depth MD (ft): 14000 - 15020 Perforation Depth TVD (ft): 8695-8666 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Leemhuis, Jacob from without prior written approval. Email Jacob.Leemhuis@bp.com Printed Name John Egbeiimba Title Drilling Supervisor Signature Phone +1 907 564 4139 Date l7L2_0 Commission Use Only Permit to Drill j Number: f /' �� /" /'�" ~ API Number: 50- 029-21115-03-00 Permit Approval Date: � (�� See cover letter for other /y 11 1� requirements: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Other: Samples req'd: Yes 11 No 19tMud log req'd: Yes ❑ No 19/ v H2S measures Yes lsd' No Directional svy req'd: Yes � No ❑ �❑/ Spacing exception req'd: Yes El No Lod Inclination -only svy req'd: Yes ❑ No Gd' Post initial injection MIT req'd: Yes ❑ No ❑ APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: I ORIGINAL Form 10-401 Revised 11/2015 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) Submit Form and Attachments in Duplicate To: Alaska Oil & Gas Conservation Commission From: Jacob Leemhuis by CTD Engineer Date: November 9, 2016 Re: 15-16C Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well 15-16B by the Nordic 2 Coiled Tubing Drilling rig on or around December 15, 2016. The 15-16C sidetrack will be a single string exit from the existing 4-1/2" liner. A packer whipstock will be set allowing isolation from the parent perforations. 15-16C will kickoff from 4-1/2" liner drilling a horizontal well to provide offtake in the target fault block across the Zone 1A sands. Well design involves kicking off a 4-1/2" packer whipstock, drilling build section with 20 DLS landing prior to crossing fault #1, drilling lateral with 12 DLS geosteering above BSAD as needed, run 3-1/2" x 3-1/4" x 2-7/8" L-80 production liner, cemented and perforated. Rig Work (scheduled to begin December 15, 2016) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,532 psi). 2. Set 4-1/2" Packer Whipstock 3. Mill 3.80" window and 10' of rathole. 4. Drill Build: 4.25" OH, —381'(20 deg DLS planned). 5. Drill Lateral: 4.25" OH, 2,416' 12 deg DLS planned). 6. Run 3-1/4" x2-7/8" L-80 liner leaving TOL at 12,600' MD. 7. Pump primarycement job: 33.5 bbls, 15.3 ppg Class G, TOC at 12,600' MD.✓ 8. Perform cleanout run if needed 9. Perform liner lap test*. 2_c400 c-si t—S � VIZ�S utiZ 10. Perforate —800' 11. Freeze protect well to a min 2,100' TVDss. 12. Close in tree, RDMO. *Approved alternative plug placement per 20 AAC 25.112 (i) Post -Rig Work 1. V Pull TWC. Tree work as necessary 2. S Set LTP (if necessary) 3. F Pressure Test LTP (if necessary) 4. T ASRC flowback 5. C RPM Log 6. F SIT *Approved alternative plug placement per 20 AAC 25.112 (i) Mud Program: Po" cr -M �Dm%LL Milling/drilling: 8.4 - 9.5 ppg solids free fluid for milling window and drilling (8.4 ppg provides 356 psi over -balance) Disposal: • All Class 1& II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids > 1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through %" screen must go to GNI. • Fluids with pH > 11 must go to GNI. Hole Size: • 4.25" from 13,300' MD to 16,097' MD Liner Program: • 3-1/2" 9.2# L-80, STL Solid from 12,600' MD to —13,280' MD • 3-1/4" 6.4# L-80, TCII Solid from 13,280' MD to —14,500' MD • 2-7/8" 6.2# L-80, STL Solid from 14,500' MD to 16,097' MD • 33.5 bbls of 15.3 ppg cement will be used to cement the liner in place. (TOC at 12,600' MD) • The primary barrier for this operation: minimum EMW of 8.4 ppg (provides 356 psi overbalance) • A cross over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams, and the CT packoff will be pressure tested to 250 psi low and 3,500 psi high. • The annular preventer will be tested to 250 psi low and 3,500 psi high. �r— Directional: • See attached directional plan. Maximum planned hole angle is 95*. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property line: 20,800' • Distance to nearest well within pool: 460' Logging: • MWD directional, gamma ray, and resistivity will be run over all of the open hole section. Anti -Collision Failures: • 15-16C passes BP Anti -Collision criteria. Hazards: • DS 15 is not considered a H2S pad • Most recent H2S level on DS 15 was at 15-20C with 40 ppm recorded on 7/1/2016 • Lost circulation potential in 15-16C is considered to be med (2 mapped fault in target location) Reservoir Pressure: • The reservoir pressure on 15-16C is expected to be 3,390 psi at 8,578' TVDss. (7.6 ppg EMW) • Maximum expected surface pressure with a full column of gas (0.10 psi/ft) to surface is 2,532 psi. ° • An EMW of 8.4 ppg will provide a 356 psi overbalance to the reservoir. Jacob Leemhuis CC: Well File CTD Engineer Joe Lastufka Jacob.Leemhuis@bp.com 907-564-4989 i TFEE = a1 VVELLHEAD =_ FMC ACTUATOR= Note: Refer to Production DB for historical perf data OKB. ELEV = �BAKERC 71.0' REF ELEV = KOP = — _3000' Max Angle = 95° @ 15326' Datum MD =_ NA Datum TVD = 8800' SS 13-3/8" CSG, 72#, L-80, D = 12.34 2495' F inimum ID = 3"725" @ 12216' -1/2" HES XN NIPPLE 9-5/8" WFIPSTOCK(03/21/10) 4587• 9-518" CSG, 47#, L-80 BTC, D = 8.681" 1-� 10860- 15 -16B 08$0• 15 -16B SAFFIY NOTES: WELL ANGLE > 70' 13( 4-1/2" CHROM E TBG` ORIG WELL & 15- 16A r4OT SHOWN BELOW WHIPSTOCK— F--2230- 4-1 /2" HES X NP, D = -3 813" PERFORATION suw ARY REF LOG: ANGLE AT TOP PERF: 92° @ 14000' Note: Refer to Production DB for historical perf data SQE SPF MER1/AL OpNSgz SHOT SQZ 2.88" 6 13380 - 13820 S 04/07/10 06/19/14 2.88" 6 14000 - 14450 O 04/07/10 BK 2.88" 6 14600 - 14630 C 04/07/10 KBG2 2.88" 6 14670 - 14750 C 04/07/10 12039 7930 2.88" 6 14850 - 15020 C 04/07/10 04/09/10 4-112" TBG, 12.6#, 13CR-85 VAM TOP, .0152 bpf, D = 3-958" 1 12228' 1 7" LNR, 26#, L-80 VAM TOP HC, .0383 bpf,D = 6-276" 12398' u- 4-1/2' LNR, 12.6#, L-80 BT -M, .0152 bpf, D = 3.958" rA.q I FT AM Kana c ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3550 3531 18 MtMG DOME RK 16 11/02/16 3 6987 5503 61 KBG2 DOME BK 16 11/02/16 2 10590 7004 66 KBG2 DMY BK 0 04/09/10 1 12039 7930 35 KBG2 DMY BK 0 04/09/10 4441' 19-518" X 7" ZXP LTP w fTEBACK SLV, D = 6.290" 4457' 9-518" X 7" BKR FLIXLOCK LNR HGR, D = 6.180" MLLOUT WINDOW (15-168) 4587' - 4604' 12073' 1-�4-1/2" HES X NP, 0=3-813- 12108- =3-813" 15543' 15632" 12108' I- 17" X 4-1 /2" HES TNT R<R D = 3.856" 1 12139' 1 DATE REV BY COM A34TS DATE REV BY COMVENTS — 06/30/84 11118/90 OWGINALCOMPLEHON LAST WORKOVER 07/25114 05/02/16 JCF/JMD Swim CMT SOZJFISH(6/19-29/14) SET CBP (04/27116) 11/20/01 CTDSIDETRACK(15-16?) 11/01/16 JMD PRERIGCLEANUP 12/31/01 CHITP CTD SIDETRACK(15-16A?) 11/07/16 ZV/JMD GLVCIO (11/02/16) 04101/10 WES CTD SIDETRACK (15-16B)11/10/16 JNUJMD ADDED REF & BF ELEVATIONS 04/18/10 TLH DRLG HO CORRECTIONS 14-112" HES X NP, D = 3.813" 1 12216' 12219' 1:7"X :1D HRD-E ZXPN LTP W f EBACKV, = 4.190" 12228' 4-112" WLEG, D = 3.958" 12235' 7" X 5" BKR FLIXLOCK LNR HGR IID = 4.340" 12246' 14555' 4-1/2"WFDCIBP(4/27/16) 15533' CTMD II FSH: WFTCIBP MILL® (6/29/14) PRUDHOE BAY LW WELL: 15-166 PERW W: `210020 AR ND: 50-029-21115-02-00 SEC 22, T11N, R74E, 854' FNL & 165' FWL BP Exploration (Alaska) WELLHEAD = FMC ^_ ACTt1ATOR = 4-112" KB PKR WHIPSTOCK (_/ /_) OKB. ELEV VLV BF. ELEV = NA KOP= 3000' Max Angle = _° @ Datum MD = MMG Datum TVD = 8800' SS PROPOSEL 15-16C SAFETY K . ES: WELL ANGLE > 70° @ _.—'. ***4-112" CHROME TBG*** Rev 2 2230' 4-112" HES X NP. D = 3.813" 13-3/8" CSG, 729, L-80, D = 12.347" 1— { 2496' Minimum ID = " aLd I9-5/8" WHIPSTOCK (03/21/10) I 4587' 9-5/8" CSG, 47#, L-80 BTC, ID = 8.681" —r 4687 PERFORATION SLA"RY REE LOG: ANGLE AT TOP PERF: _° @ _ NDte: Refer to Production DB for historical pert data SIZE I SPF I IYTERI/AL I Opn/Sqz I SHOT SOZ 4-1/2" TBG, 12.6#, 13CR-85 VAM TOP, 12228' 0152 bpf, D = 3-958" 7" LNR, 26#, L-80 VAM TOP HC, 1—t_12398- -0383 12398•.0383 bpf,D = 6.276" I 12600' 3-112" LNR, 9.2#, L-80 STL, .0087 bpf, D = 2.992" J—+ 13280' TVD 4-112" KB PKR WHIPSTOCK (_/ /_) 133OW VLV 4-112' LNR, 12.6#, L-80 BT -M, ^ 13300' DATE .0152 bpf, D = 3.958" 3550 3531 18 MMG 3-3/16" LNR, 6.2#, L-80 TCIt .0076 bpf, D = Z80;;—]--14500' RK PBTD 2-7/8" LNR, 6-4#, L-80 STL, .0058 bpf, D = 2.441 " 16100' ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3550 3531 18 MMG DMY RK 0 06/16/14 3 6987 5503 61 KBG2 DMY BK 0 06/16/14 2 10590 7004 66 KBG2 DMY BK 0 04/09/10 1 12039 7930 35 KBG2 DMY BK 0 04/09/10 4441' --� 9-5/8" X 7" ZXP LTP w /TEBACK SLV, D = 6.290" 4457' 9-5/8" X 7" BKR FLIXLOCK LNR HGR, D = 6.180" FFALLOUITVIANDOW(16-116B) 4587'-4604- 12073' 587'-4604' 12073' 1-1 4-1/2" HES X NP, [)=3.813" 12108' —17" X 4-1/2" HES TNT PKR D = 3-856" 12139' 4-1/2- HES X NP, D = 3,813- 12216' 1—{ 4-1/2" HES XN NP MILLED TO 3.80" 12219' —{ 7" X 5" HRD-E ZXPN LTP w /TEBACK SLV, D=4-190" 12228' 4-1/2" WLEG, D = 3.958" 12235' 7" X 5" BKR FLEXLOCK LNR HGR, D = 4-340- 12246- 5" X 4-1/2" XO, D = 3.910- 12600- J—j3-70" DEPLOY SLV, D= 3.00" 3-112" X NIP, D = 2.813" 13280' 3-1/2" X 3-3/16" XO, ID = 2.876" MILLOUT WINDOW (15-16C) 13300'-_' 14600' j—i 3-3/16" X 2-7/8" XO, D = 2.377" DATE REV BY COMMENTS DATE REV BY COMMENTS 06/30/84 ORIGINAL COMPLETION 11101116 JMD BUILT PROPOSED 11/18/90 LAST WORKOVER 11/01/16 JMD BUILT PROPOSED REV 1 11/20/01 CTD SIDETRACK (15-16?) 11/02116 JCL UPDATED TOP OF LINER 12/31/01 CHITP CTD SIDETRACK (15-16A?) 04/01/10 N7ES CTD SIDETRACK (15-16B) 1 /i ICTD SIDETRACK(15-16C) PRUDHOE BAY UNIT WELL: 15-16C PERMIT No: API No: 50-029-21115-03 SEC 22, T11 N, R14E, 854' FNL & 165' FWL BP Ecploration (Alaska) by North America - ALASKA - BP Prudhoe Bay PB DS 15 15-16 15-16C Plan: 15-16C WP06 BP Coil Tubing Report 10 November, 2016 FMA I &P,,-- 2 BAKER HUGHES %*N'"z by BP BP Coil Tubing Report Declination �, �► Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16C Survey Calculation Method: Minimum Curvature Design: 15-16C WP06 Database: EDM R5K-Alaska PROD -ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor rias BAKER HUGHES Site S PB DS 15; TR -11-14 Declination Dip Angle Field Strength Site Position: Northing: 5,958,837.360 usft Latitude: 70° 17' 35.236 N From: Map Easting: 676,296.980 usft Longitude: 148° 34'21.213 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.34 ° Well 15-16, 15-16 +N/ -S +E/ -W Direction (usft) Well Position +N/ -S 0.00 usft Northing: 5,960,630.760 usft . Latitude: 70° 17' 52.919 N +E/ -W 0.00 usft Easting: 676,088.190 usft Longitude: 148° 34'26.072 W Position Uncertainty 0.00 usft Wellhead Elevation: 36.02 usft Ground Level: 32.80 usft Wellbore 15-16C Magnetics Model N 11/10/2016 9:24:30AM Page 2 COMPASS 5000.1 Build 81B ame ample Date Declination Dip Angle Field Strength BGGM2016 1/1/2017 18.14 81.02 57,558 Design 15-16C WP06 Audit Notes: Version: Phase: PLAN Tie On Depth: 13,219.79 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (I - -36.02 0.00 0.00 90.00 11/10/2016 9:24:30AM Page 2 COMPASS 5000.1 Build 81B �+b� BP ?►� �i BP Coil Tubing Report N Northing Company: North America - ALASKA- BP DLeg Project: Prudhoe Bay (usft) Site: PB DS 15 (usft) Well: 15-16 (usft) Wellbore: 15-16C 5,967,050.777 Design: 15-16C WP06 0.00 Survey Tool Program Date 11/10/2016 4,710.54 From To 680,648.536 (usft) (usft) Survey (Wellbore) Tool Name 90.00 4,540.00 15-16 Srvy 2 GYD CT CMS (15-16) GYD-CT-CMS 4,587.00 4,604.00 15-16BPB1 Srvy 1 Blind (15-16BPB1) BLIND 4,626.54 4,720.47 15-16BPB1 Srvy 2 Inc+Trend (15-16BPB1 INC+TREND 4,813.93 12,335.13 15-16BPB1 Srvy 3 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA 12,409.41 12,912.00 15-16BPB1 Srvy 4 MWD+IFR+MS (15-1613 MWD+IFR+MS-WOCA 12,938.02 13,219.79 15-16B Srvy 1 MWD+IFR+MS (15-16B) MWD+IFR+MS-WOCA 13,219.79 16,097.00 15-16C WP06 (15-16C) MWD Planned Survey 4,687.27 MD Inc Azi TVDSS N/S (usft) (°) (°) (usft) (usft) 13,219.79 79.60 351.18 8,597.94 6,311.68 Actual Survey 15-16B 13,251.13 79.81 350.82 8,603.54 6,342.13 Actual Survey 15-16B 13,281.94 80.23 351.08 8,608.88 6,372.10 Actual Survey 15-16B TIP 13,300.00 80.47 350.61 8,611.91 6,389.68 KOP 13,320.00 81.75 349.32 8,615.00 6,409.13 End 9deg/100ft 13,370.00 88.86 342.27 8,619.10 6,457.38 6 13,400.00 88.45 336.28 8,619.80 6,485.41 13,500.00 87.22 316.30 8,623.61 6,568.12 13,600.00 86.33 296.29 8,629.29 6,626.93 13,681.30 85.93 280.00 8,634.82 6,652.11 End 20deg/100ft 13,700.00 85.93 277.75 8,636.14 6,654.99 13,800.00 86.05 265.72 8,643.16 6,658.01 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Description Gyrodata cont.casing m/s Blind drilling Inclinometer + known azi trend MWD + IFR + Multi Station W/O Crustal MWD + IFR + Multi Station W/O Crustal MWD + IFR + Multi Station W/O Crustal MWD - Standard Well 15-16 Mean Sea Level 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 E/W Northing Easting DLeg V. Sec (usft) (usft) (usft) (°/100usft) (usft) 4,715.37 5,967,050.777 680,654.072 0.00 4,715.37 4,710.54 5,967,081.109 680,648.536 1.31 4,710.54 4,705..77 5,967,110.953 680,643.063 1.60 4,705.77 4,702.94 5,967,128.458 680,639.819 2.89 4,702.94 4,699.49 5,967,147.828 680,635.922 9.00 4,699.49 4,687.27 5,967,195.768 680,622.569 20.00 4,687.27 4,676.66 5,967,223.548 680,611.308 20.00 4,676.66 4,621.49 5,967,304.938 680,554.222 20.00 4,621.49 4,541.44 5,967,361.852 680,472.821 20.00 4,541.44 4,464.62 5,967,385.223 680,395.439 20.00 4,464.62 4,446.20 5,967,387.668 680,376.950 12.00 4,446.20 4,346.67 5,967,388.351 680,277.388 12.00 4,346.67 rel FAa BAKER HUGHES TFace 0.00 -59.37 31.39 -62.66 -45.OU -45.00 -94.00 -93.86 -93.10 -91.96 -90.00 -89.84 11/10/2016 9:24:30AM Page 3 COMPASS 5000.1 Build 81B bp 000.r BP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16C Survey Calculation Method: Minimum Curvature Design: 15-16C WP 06 Database: EDM R5K-Alaska PROD -ANCP1 Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) (°) 13,900.00 86.35 253.70 8,649.80 6,640.21 4,248.68 5,967,368.268 680,179.845 12.00 4,248.68 -89.00 13,981.01 86.71 243.97 8,654.72 6,611.05 4,173.36 5,967,337.349 680,105.240 12.00 4,173.36 -88.' 8 14,000.00 86.71 246.25 8,655.81 6,603.07 4,156.17 5,967,328.969 680,088.237 12.00 4,156.17 90.00 14,100.00 86.81 258.27 8,661.49 6,572.70 4,061.25 5,967,296.388 679,994.064 12.00 4,061.25 89.87 14,200.00 87.05 270.28 8,666.87 6,562.76 3,962.08 5,967,284.125 679,895.156 12.00 3,962.08 89,19 14,300.00 87.42 282.29 8,671.71 6,573.68 3,862.98 5,967,292.719 679,795.834 12.00 3,862.98 88.54 14,301.01 87.42 282.41 8,671.76 6,573.89 3,861.99 5,967,292.911 679,794.843 12.00 3,861.99 87.96 9 14,400.00 83.82 271.06 8,679.34 6,585.47 3,764.15 5,967,302.191 679,696.766 12.00 3,764.15 -108.00 14,411.01 83.44 269.78 8,680.56 6,585.55 3,753.21 5,967,302.015 679,685.826 12.00 3,753.21 -107.13 10 14,500.00 83.55 259.04 8,690.68 6,576.95 3,665.35 5,967,291.360 679,598.194 12.00 3,665.35 -90.00 14,531.01 83.64 255.29 8,694.14 6,570.11 3,635.31 5,967,283.814 679,568.323 12.00 3,635.31 -88.78 11 14,600.00 87.82 262.46 8,699.28 6,556.86 3,567.86 5,967,268.991 679,501.208 12.00 3,567.86 60.00 14,635.70 90.00 266.15 8,699.96 6,553.32 3,532.35 5,967,264.620 679,465.795 12.00 3,532.35 59.4' 12 14,700.00 92.38 273.49 8,698.62 6,553.12 3,468.11 5,967,262.915 679,401.583 12.00 3,468.11 72.00 14,780.70 95.30 282.75 8,693.21 6,564.47 3,388.49 5,967,272.394 679,321.728 12.00 3,388.49 72.15 13 14,800.00 95.30 280.42 8,691.42 6,568.33 3,369.67 5,967,275.811 679,302.818 12.00 3,369.67 -90.00 14,880.70 95.19 270.70 8,684.03 6,576.10 3,289.78 5,967,281.712 679,222.778 12.00 3,289.78 -90.21 14 14,900.00 94.47 268.49 8,682.41 6,575.97 3,270.55 5,967,281.124 679,203.556 12.00 3,270.55 -108.00 15,000.00 90.66 257.09 8,677.92 6,563.44 3,171.63 5,967,266.283 679,104.957 12.00 3,171.63 -108.19 15,017.10 90.00 255.15 8,677.83 6,559.34 3,155.03 5,967,261.795 679,088.460 12.00 3,155.03 -108.70 15 11/10/2016 9.24:30AM Page 4 COMPASS 5000.1 Build 81B wood by BP Firs 100 BP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16C Survey Calculation Method: Minimum Curvature Design: 15-16C WPO6 Database: EDM R5K-Alaska PROD -ANCP1 Planned Survey - MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) (°) 15,100.00 90.00 265.10 8,677.83 6,545.14 3,073.46 5,967,245.690 679,007.249 12.00 3,073.46 90.00 15,200.00 90.00 277.10 8,677.83 6,547.05 2,973.66 5,967,245.266 678,907.440 12.00 2,973.66 90.' 15,277.00 90.00 286.34 8,677.83 6,562.68 2,898.35 5,967,259.119 678,831.788 12.00 2,898.35 90.0u 16 15,300.00 90.00 283.58 8,677.83 6,568.61 2,876.13 5,967,264.534 678,809.436 12.00 2,876.13 -90.00 15,400.00 90.00 271.58 8,677.83 6,581.78 2,777.18 5,967,275.376 678,710.216 12.00 2,777.18 -90.00 15,500.00 90.00 259.58 8,677.83 6,574.09 2,677.66 5,967,265.353 678,610.909 12.00 2,677.66 -90.00 15,557.00 90.00 252.74 8,677.83 6,560.46 2,622.35 5,967,250.435 678,555.937 12.00 2,622.35 -90.00 17 15,600.00 90.09 257.90 8,677.79 6,549.56 2,580.77 5,967,238.569 678,514.623 12.00 2,580.77 89.00 15,700.00 90.30 269.90 8,677.45 6,538.95 2,481.51 5,967,225.637 678,415.654 12.00 2,481.51 89.00 15,800.00 90.49 281.90 8,676.77 6,549.21 2,382.23 5,967,233.561 678,316.160 12.00 2,382.23 89.04 15,837.00 90.55 286.34 8,676.43 6,558.23 2,346.36 5,967,241.738 678,280.091 12.00 2,346.36 89.13 18 15,900.00 90.55 278.77 8,675.83 6,571.91 2,284.91 5,967,253.979 678,218.343 12.00 2,284.91 -90.00 16,000.00 90.52 266.77 8,674.89 6,576.74 2,185.21 5,967,256.473 678,118.568 12.00 2,185.21 -90.07 16,097.00 90.47 255.13 8,674.04 6,561.52 2,089.59 5,967,239.014 678,023.333 12.00 2,089.59 -90. TD at 16097.00 11/10/2016 9:24:30AM Page 5 COMPASS 5000.1 Build 818 BP p BP Coil Tubing ReportB HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16C Survey Calculation Method: Minimum Curvature Design: 15-16C WP06 Database: EDM R5K-Alaska PROD -ANCP1 Targets - Target Name hit/miss target Dip Angle Dip Dir. TVD +N/ -S +E/ -W Northing Easting Shape V) (I (usft) (usft) (usft) (usft) (usft) Latitude Longitude 15-16C Fault 1 0.00 0.00 0.00 7,002.69 3,539.09 5,967,714.000 679,462.000 70° 19' 1.782 N 148° 32'42.811 W plan misses target center by 8686.42usft at 13904.14usft MD (8650.07 TVD, 6639.04 N, 4244.72 E) Polygon Point 1 0.00 0.00 0.00 5,967,714.00 679,462.00 Point 2 0.00 -426.23 217.09 5,967,293.00 679,689.00 Point 3 0.00 -752.69 445.52 5,966,972.00 679,925.00 Point 4 0.00 -426.23 217.09 5,967,293.00 679,689.00 15-16C Fault 3 0.00 0.00 0.00 6,362.36 3,159.95 5,967,065.000 679,098.000 70° 18'55.486 N 148° 32'53.881 W plan misses target center by 8679.98usft at 15046.06usft MD (8677.83 TVD, 6552.77 N, 3126.82 E) Polygon Point 1 0.00 0.00 0.00 5,967,065.00 679,098.00 Point 2 0.00 414.58 578.91 5,967,493.00 679,667.00 Point 3 0.00 574.81 1,168.86 5,967,667.00 680,253.00 Point 4 0.00 913.13 1,971.06 5,968,024.00 681,047.00 Point 5 0.00 574.81 1,168.86 5,967,667.00 680,253.00 Point 6 0.00 414.58 578.91 5,967,493.00 679,667.00 15-16C T4_ 0.00 0.00 8,674.00 6,536.11 1,892.59 5,967,209.000 677,827.000 70° 18'57.199 N 148° 33'30.855 W plan misses target center by 198.63usft at 16097.00usft MD (8674.04 TVD, 6561.52 N, 2089.59 E) Point 15-16C T3_ 0.00 0.00 8,678.00 6,569.97 3,179.82 5,967,273.000 679,113.000 70° 18' 57.527 N 148° 32'53.299 W plan misses target center by 4.64usft at 14991.04usft MD (8678.05 TVD, 6565.36 N, 3180.38 E) Point 15-16C Polygon 0.00 0.00 0.00 7,044.87 1,561.59 5,967,709.830 677,484.190 70° 19'2.203 N 148° 33'40.509 W plan misses target center by 8703.53usft at 16097.00usft MD (8674.04 TVD, 6561.52 N, 2089.59 E) Polygon Point 1 0.00 0.00 0.00 5,967,709.83 677,484.19 Point 0.00 -71.91 1,905.61 5,967,682.59 679,390.84 Point 3 0.00 -391.06 2,096.64 5,967,368.03 679,589.28 Point 4 0.00 -341.66 2,498.75 5,967,426.83 679,990.10 Point 5 0.00 -639.61 2,660.89 5,967,132.78 680,159.16 Point 0.00 -725.55 2,196.81 5,967,036.00 679,697.25 Point 7 0.00 -804.49 998.36 5,966,929.00 678,501.06 Point 8 0.00 -970.44 -59.07 5,966,738.34 677,447.88 11/10/2016 9:24:30AM Page 6 COMPASS 5000.1 Build 81B 11/10/2016 9:24:30AM Page 7 COMPASS 5000.1 Build 81B BP by ri6 . BP Coil Tubing Report BAKER HUGHES Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Well: 15-16 North Reference: True Wellbore: 15-16C Survey Calculation Method: Minimum Curvature Design: 15-16C WP06 Database: EDM R5K-Alaska PROD -ANCP1 Point 9 0.00 -961.54 -440.37 5,966,738.30 677,066.50 - Point 10 0.00 0.00 0.00 5,967,709.83 677,484.19 15-16C T2_ 0.00 0.00 8,700.00 6,535.33 plan misses target center by 16.90usft at 14662.99usft MD (8699.72 TVD, 6552.23 N, 3505.08 E) 3,505.12 5,967,246.000 679,439.000 70° 18'57.185 N 148° 32'43.808 W Point 15-16C Fault 2 0.00 0.00 0.00 7,522.25 plan misses target center by 8732.60usft at 15000.00usft MD (8677.92 TVD, 6563.44 N, 3171.63 E) 3,352.20 5,968,229.000 679,263.000 70° 19'6.892 N 148° 32'48.257 W Polygon Point 1 0.00 0.00 0.00 5,968,229.00 679,263.00 Point 0.00 -942.85 -148.14 5,967,283.00 679,137.00 15-16C T1_ 0.00 0.00 8,674.00 6,582.36 plan misses target center by 1.77usft at 14360.37usft MD (8675.56 TVD, 6583.17 N, 3803.53 E) 3,803.33 5,967,300.000 679,736.000 70° 18'57.646 N 148° 32'35.107 W Point 11/10/2016 9:24:30AM Page 7 COMPASS 5000.1 Build 81B BP by ri.� BP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA - BP TVD Reference: Mean Sea Level MD Reference: Project: Prudhoe Bay True Survey Calculation Method: Minimum Curvature Database: Site: PB DS 15 Well: 15-16 Wellbore: 15-16C Design: 15-16C WP06 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 13,219.79 8,597.94 6,311.68 4,715.37 Actual Survey 15-16B 13,251.13 8,603.54 6,342.13 4,710.54 Actual Survey 15-16B 13,281.94 8,608.88 6,372.10 4,705.77 Actual Survey 15-16B TIP 13,300.00 8,611.91 6,389.68 4,702.94 KOP 13,320.00 8,615.00 6,409.13 4,699.49 End 9deg/100ft 13,370.00 8,619.10 6,457.38 4,687.27 6 13,681.30 8,634.82 6,652.11 4,464.62 End 20deg/100ft 13,981.01 8,654.72 6,611.05 4,173.36 8 14,301.01 8,671.76 6,573.89 3,861.99 9 14,411.01 8,680.56 6,585.55 3,753.21 10 14,531.01 8,694.14 6,570.11 3,635.31 11 14,635.70 8,699.96 6,553.32 3,532.35 12 14,780.70 8,693.21 6,564.47 3,388.49 13 14,880.70 8,684.03 6,576.10 3,289.78 14 15,017.10 8,677.83 6,559.34 3,155.03 15 15,277.00 8,677.83 6,562.68 2,898.35 16 15,557.00 8,677.83 6,560.46 2,622.35 17 15,837.00 8,676.43 6,558.23 2,346.36 18 16,097.00 8,674.04 6,561.52 2,089.59 TD at 16097.00 Local Co-ordinate Reference: Well 15-16 TVD Reference: Mean Sea Level MD Reference: 15-16B @ 61.00usft (Nabors 7ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 11/10/2016 9:24:30AM Page 8 COMPASS 5000.1 Build 81B p ,mNnsto True Noen VVELLBORE DETAILS: 15-16(: K&EKENUt ftu mNUN Project: Prudhoe Bay Megr iNoM: 18.14 bp Site: PBDS15 Ngreac Red 15-16C C-rdinate(NIP Reference: Well 15-16, True North Well: 15.16 strergtn: 57557.!%72 Vedical JVD) Reference: Mean Sea Level Wellbore: 15.16C olpAngle: 81.o2 Seaton(VS) Reference: Slot -(0.00N, 0.00E) Date: 11112011 Parent Wellbore: 15-16B PI2n:15-16CWP06(15-16115-16C) Wad BGGM2011 Tie on MD: 13219.79 MeasuredDepth Reference: 18168@61.00usn(Nabors7ES) Catculafion Method: Minimum Curvature 9 9 C IN to BAKER HUGHES 8200 - WELL DETAILS: 15-16 1- 6CP I_ 3000 7800 J- -- Ground Level: 32.80 1 i 1$-16/15�16B I +N/ -S +E/ -W /600 Northing Easting Latittude Longitude Slot 0.00 0.00 5960630.760 676088.190 70' 17'52.919 N 148'34'26.072W 1-16 Ldt2 I 7200 SECTION DETAILS ANNOTATIONS Sec MD Inc Azi ssTVD +NI -S +EI -W Dleg TFace VSect Target TVD MD Annotation 1 13219.79 79.60 351.18 8597.94 6311.68 4715.37 0.00 0.00 4715.37 8597.94 13219.79 ActualSurvey15-16B 2 13251.13 79.81 350.82 8603.54 6342.13 4710.54 1.31 -59.37 4710.54 8603.54 13251.13 ActualSurvey15-16B 3 13281.94 80.23 351.08 8608.88 6372.10 4705.77 1.60 31.39 4705.77 8608.88 13281.94 Actual Survey 15-16B TIP 4 13300.00 80.47 350.61 8611.91 6389.68 4702.94 2.89 -62.66 4702.94 8611.91 13300.00 KOP 5 13320.00 81.75 349.32 8615.00 6409.13 4699.49 9.00 -45.00 4699.49 8615.00 13320.00 End9deg1100ft 6 13370.00 88.86 342.27 8619.10 6457.38 4687.27 20.00 -45.00 4687.27 8619.10 13370.00 6 7 13681.30 85.93 280.00 8634.82 6652.11 4464.62 20.00 -94.00 4464.62 8634.82 13681.30 End20deg1100ft 8 13981.01 86.71 243.97 8654.72 6611.05 4173.36 12.00 -90.00 4173.36 8654.72 13981.01 8 9 14301.01 87.42 282.41 8671.76 6573.89 3861.99 12.00 90.00 3861.99 8671.76 14301.01 9 10 14411.01 83.44 269.78 8680.56 6585.55 3753.21 12.00 -108.00 3753.21 8680.56 14411.01 10 11 14531.01 83.64 255.29 8694.14 6570.11 3635.31 12.00 -90.00 3635.31 8694.14 14531.01 11 12 14635.70 90.00 266.15 8699.96 6553.32 3532.35 12.00 60.00 3532.35 8699.96 14635.70 12 13 14780.70 95.30 282.75 8693.21 6564.47 3388.49 12.00 72.00 3388.49 8693.21 14780.70 13 14 14880.70 95.19 270.70 8684.03 6576.10 3289.78 12.00 -90.00 3289.78 8684.03 14880.70 14 15 15017.10 90.00 255.15 8677.83 6559.34 3155.03 12.00 -108.00 3155.03 8677.83 15017.10 15 16 15277.00 90.00 286.34 8677.83 6562.68 2898.35 12.00 90.00 2898.35 8677.83 15277.00 16 17 15557.00 90.00 252.74 8677.83 6560.46 2622.35 12.00 -90.00 2622.35 8677.83 15557.00 17 18 15837.00 90.55 286.34 8676.43 6558.23 2346.36 12.00 89.00 2346.36 8676.43 15837.00 18 19 16097.00 90.47 255.13 8674.04 6561.52 2089.59 12.00 -90.00 2089.59 8674.04 16097.00 TO at 16097.00 I 9 9 C IN to BAKER HUGHES 8200 - 1 --- 1- 6CP I_ 3000 7800 J- -- 1 i 1$-16/15�16B I 1 /600 7400 � 1-16 Ldt2 I 7200 15-16/15-16B ]Doo ; 15-116CF i ultI - - A00 - - 1 5600 t ! 15 1615 - 6 Actual Survey IS -16B TIF ' -- -� KOP - Hod 9de8/100ft "- ADD nd 20de8/100 00 _ \ at 16097 00 I i� X75 150 -� 25 - 18 5200 i �7 1 --- 13 t i -16C IS-16CT1 5000 rt 00 75 ,)n 75 71 nn 9196 99872 I _ 15-16 T3_ �__ IS-16CT21 I 180 0 1600 - I 1400 I rcvv ­iuuu louu cuuu taw z4vu z0vu Muu JUM 32UU 34UU 3600 3800 4000 4200 4400 4600 West( -)/East(+) (200 usftlin) 125--- I� �- ! -� I - - -- 1- 6CP 6 1 175 ! 150 -� 15-16/15-16B 125 -�-- - I - - - 6 Actual Survey IS -16B TIF ' -- -� KOP - Hod 9de8/100ft "- nd 20de8/100 00 _ \ at 16097 00 I i� X75 150 -� 25 - 18 - i �7 1 I5� 4 15-16CT3_ 13 t i 12 - 11 10 t 15-I TI 00 75 ,)n 75 71 nn 9196 99872 I -------- I ---- -- ---- ---- ---- ---- ---- -- _ -.-- ,..,, ,,,., ,e., 1- n'r, WJV -3 - 4772 4JJU 4423 45UU 4575 4650 425 4800 4875 4950 Vertical Section at 90.001 (75 usft/in) 1 Project: Prudhoo Bay WELLBORE DETAILS: 1b-161; KLFEhhNUHNFVKWIIUN Well: PB DS 15 Co-ordinate (WE) Reference: Wel 15-16, True North Well: 15-16 Maerer�Fiau 15-161 Suerem.57557.5sn Vertical (TVD) Reference: Mean Bea Level W1lcW 15-161 o�pnrgle: e+.oz suredSecdoepth Reference: Sb168@6100usft Plan: 15-161 WP06 15-16/15.161 oate:inrm+ Parent Wellbore: 15-168 Measured Depth Reference: 15-16um Curitusft(Nehors 7E5) ,too� bpMudd: BGGN1271 Tle on MD: 13219.79 Cacualon Method: Minimum CurvaWre 8550+ 840 825 810 795 780 765 750 735 7200 705 690 + 675 660 00., 645 r 6300 O 615 6000 5850 5700 555 5400 5250 510 495 4800 rr.r BIKER HUGHES 0 0 0 0 -- - 15-27A I y y � y i I I I ' I y 1516B omo �5-28B —� I I i + � 15-16 I 1-13 I— - 7APB1 x I I S I 15 28A - i 94 15-1 BPBI I I S _ IS 36BP I t � I I vI1{j � I 15 371 15 36AP 1 g 000 ^ { n 1 - 17001 6fi 15- 6B I5-16 19-3 - - 15-17- I 8gQ3 IS 37 -- - -- - � Mean Sea Level 300 450 600 750 900 1050 1200 1350 1500 1650 1800 1950 2100 2250 2400 2550 2700 2850 30(36-33.j56313300 3450 3600 3750 3900 4050 4200 43506A4500 4650 4800 4950 5100 5250 5400 5550 5700 West( -)/East(+) (150 usft/in) 15-30 15-30APB1 15-30A w Nil Project: Prudhoe Bay Site: PB DS 15 Well: 15-16 Wellbore: 15-16C Plan: 15-16C WP06 (15-16115-16C) ANTI -COLLISION SETTINGS COMPANY DETAILS: North America - ALASKA - BP Interpolation Method: MD, interval: 25.00 Calculation Method: Minimum Curvature Depth Range From: 13219.79 To 16097.00 Error System: ISCWSA Results Limited By: Centre Distance: 1807.20 Scan Method: Tray. Cylinder North Reference: Plan: 15-16C WPO6 (15-16115-16C) Error Surface: Elliptical Conic Warnino Method- Rules Based NAME BAKER HUGHES 380 lig 'i I III 360 I' III 1 Ili l", i i I= LEGEND 340- 15-36,15-36B, 15-368 V7 15-36, 15-36, 1536 V1 320 i, ILII 15-36, 15-36APB1, 15-36APB1 V3 -�- 15-36, 15-36A, 15-36A V2 -o- 15.36, 15-366P62, 1536BPB2 V6 300 -*- 15.36, 15-3613P81, 15-368PB1 V8 a 15.16, 15-16B, 15-168 VO 15-37, 15-37C, 15-37C VO 280 L1-13 -µ 15-37, 15-37A, 15-37A V2 �I''' - 15-37, 15-37APB1, 15-37APB1 Vi 15-36APB1 -1537,1537,,537v, 260 C - L7-13, 1-1-13, L7-13 VO 240- 400220200180 .2220- 200- 180- $j C) I � 0) 160 0) C) 140 I 120 Possible Offset Well 100 Magnetic Interference: From To 80 KOP - 13,550' MD L1-13 Error Ellipse so I 40 20- 15-16B 0 W_W A_W (_Wn (_W O_A WNO A A (n Cn O N n n 0) (p Cl) A CA -1 C3 CO O O O O O O O O O O O O O O O O O O O Measured Depth (100 usft/in) O O O O O O O O O O O O O O O O O O O O O O O O O rro]ect: Prudhoe Bay ANTI -COLLISION SETTINGS COMPANY DETAILS: NorthAmerica- ALASKA - BP wards Site: PB DS 15 Calculation Method: Minimum Curvature p � � bp Well: 15-16 Interpolation Method: 132 interval: 1609 Error System: ISCWSA BMER Depth Range From: Centre Di to 16097.00 Wellbore: 15-16C Results Limited By: Centre Distance: 1807.20 Scan Method: Tray. Cylinder North N MES Plan: 15-16C WP06 (15-16/15-16C) Reference: Plan: 15-16C WP06 (15-16/15-16C) Error Surface: Elliptical Conic Warning Method: Rules Based Ground Level: 32.80 From Colour To MD -NAS +EI.WNorthing Eating Latlttude Longitude slot 13550 ,; 9.99 5960630.760 676088.190 70°17'52.919N ,48°3a'26.072W Depth Range: 13219.79 To 16097.00 13220 Sec MD Inc Azi TVD +N/ -S +E/ -W Dleg TFace VSed Possible Magnetic Interference:- - 1 13219.79 79.60 351.18 8597.94 6311.68 4715.37 0.00 0.00 4715.37 From KOP to 13,350' MD 00 13550'13800 2 13251.13 79.61 350.82 8603.54 6342.13 4710.54 1.31 -59.37 4710.54 34 --- _ B 3 13281.94 80.23 351.08 8608.88 6372.10 4705.77 1.60 31.39 4705.77 13800 ®14700 4 13300.00 80.47 350.61 8611.91 6389.68 4702.94 2.89 -62.66 4702.94 90 5 13320.00 81.75 349.32 8615.00 6409.13 4699.49 9.00 -45.00 4699.49 1470014900 6 13370.00 88.86 342.27 8619.10 6457.38 4687.27 20.00 -45.00 4687.27 - 7 13681.30 85.93 280.00 8634.82 6652.11 4464.62 20.00 -94.00 4464.62 14900 16097 8 13981.01 86.71 243.97 8654.72 6611.05 4173.36 12.00 -90.00 4173.36 320 $0 6 -9 40 9 14301.01 87.42 282.41 8671.76 6573.89 3861.99 12.00 90.00 3861.99 10 14411.0183.44 269.78 8680.56 6585.55 3753.21 12.00 -108.00 3753.21 11 14531.01 83.64 255.29 8694.14 6570.11 3635.31 12.00 -90.00 3635.31 12 14635.70 90.00 266.15 8699.96 6553.32 3532.35 12.00 60.00 3532.35 70 - 13 14780.70 95.30 282.75 8693.21 6564.47 3388.49 12.00 72.00 3388.49 - 14 14880.70 95.19 270.70 8684.03 6576.10 3289.78 12.00 -90.00 3289.78 15 15017.10 90.00 255.15 8677.83 6559.34 3155.03 12.00 -108.00 3155.03 60 16 15277.00 90.00 286.34 8677.83 6562.68. 2898.35 12.00 90.00 2898.35 17 15557.00 90.00 252.74 8677.83 6560.46 2622.35 12.00 -90.00 2622.35 15-161, WPO6 1 18 15837.00 90.55 266.34 8676.43 6558.23 2346.36 12.00 89.00 2346 _" 300 50 60 19 16097.00 90.47 255.13 8674.04 6561.52 2089.59 12.00 -90.00 2081 \ \ SURVEYPROGRAM Date: 2016-10-18T00:00:00 Validated: Yes Version: 40 Depth From Depth To Survey/Plan Tool 1390.00 4540.00 15-16Srvy2GYDCTCMS(15-16) GYD-CT-CMS 4587.00 4604.00 15-16BPB1 Sly 1 Blind(15-16BPB1) BLIND 30 4626.54 4720.47 15-16BPB1 Sly 21nc+Trend (15-16BPB1rNC+TREND 4813.93 12335.13 15-16BPB1 Sly 3 MWD+IFR+MS (15-1686191)+IFR+MS-WOCA / � 12409.41 12912.00 15-16BPB1 Sly 4 MWD+IFR+MS(15-16B991y+IFR+MS-WCCA 12938.02 13219.79 15-168 Sly 1 MWD+IFR+MS(15-16B) MWD+IFR+MS-W0CA 13219.79 16097.°0 15-16C WPD6 (15-16C) MWD 2 $0 0 49 L1- 3 1 1.34 60 20 / 30 40 240 % 50 120 60 \ EGEND 70 -e 15J6, 15-368. \ -e-15-36, 15-36, CDntaCt Info' 40 s 15-36,15-36A Jose Vazquez-IechSupporhWe n 80 ++15-36,15-36A, 714478-4339 Cell Phone 907-341-7604 Emergency - 15-36,15-368 YoshaRagbirsingh -Su veyManager 90 s-3s,lsasei 907-342-2436 CehPhone 15-16, 15168 Tai Sturdivant- DD Coordinator 2D 60 -+ 15-37,15-37C - 15-37, 15-37A 907-301-1858 Cell Phone � 100 - -tr 15-37, 15-37A Patrick Rider -MWD Coordinator - -- 180 15 1sa7, 1s-37, 907-952-3497 Call Phone g -13, a-13, I Carl Ulrich- Operations Manager Azimuth from North [°] vs Centre to Centre Separation [10 usft/in] 907-382-5534 Cell Phone 180 Azimuth from North [°] vs Centre to Centre Separation [40 usfUin] 0 North America - ALASKA - BP Prudhoe Bay PB DS 15 15-16 500292111500 15-16C 15-16C WP06 Travelling Cylinder Report 10 November, 2016 FM PPP BAKER HUGHES BP Travelling Cylinder Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: rel .a BAKER HUGHES Well 15-16 Mean Sea Level 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 15-16C WP06 �►�� � by GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 15 Site Error: 0.00 usft Reference Well: 15-16 Well Error: 0.00 usft Reference Wellbore 15-16C Reference Design: 15-16C WP06 BP Travelling Cylinder Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: rel .a BAKER HUGHES Well 15-16 Mean Sea Level 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 15-16C WP06 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 13,219.79 to 16,097.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,807.20 usft Error Surface: Elliptical Conic Survey Tool Program Date 11/10/2016 From To (usft) (usft) Survey (Wellbore) Tool Name Description 90.00 4,540.00 15-16 Srvy 2 GYD CT CMS (15-16) GYD-CT-CMS Gyrodata cont.casing m/s 4,587.00 4,604.00 15-16BPB1 Srvy 1 Blind (15-16BPB1) BLIND Blind drilling 4,626.54 4,720.47 15-16BPB1 Srvy 2 Inc+Trend (15-16BPB1 INC+TREND Inclinometer+ known azi trend 4,813.93 12,335.13 15-16BPB1 Srvy 3 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 12,409.41 12,912.00 15-16BPB1 Srvy 4 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 12 938.02 13 219 79 15-16B Srvy 1 MWD+IFR+MS (15-16B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 13,219.79 16,097.00 15-16C WP06 (15-16C) MWD MWD - Standard Casing Points Measured Vertical Diameter Depth Depth (in) (usft) (usft) 9.625 2,485.00 2,423.92 13 3/8" 4,587.00 4,327.74 9 5/8" 12,398.00 8,163.54 7" 12,912.00 8,505.33 41/2" 13,300.00 8,611.91 4 1/2" Plannd TOWS 16,097.00 8,674.04 2 7/8" Summary Site Name Offset Well - Wellbore - Design Lis DS 01 L1-13 - 1-1-13 - L1-13 PB DS 15 15-16 - 15-16 - 15-16 15-16 - 15-16A - 15-16A 15-16 - 15-16B - 15-16B 15-16 - 15-16BPB1 - 15-16BPB1 15-30- 15-30 - 15-30 15-30 - 15-30A - 15-30A 15-30 - 15-30APS1 - 15-30APB1 15-30 - 15-30B - 15-30B 15-36 - 15-36 - 15-36 15-36 - 15-36A - 15-36A 15-36 - 15-36APB1 - 15-36APB1 15-36 - 15-36B - 15-36B 15-36 - 15-36BPB1 - 15-36BPB1 15-36 - 15-36BPB2 - 15-36BPB2 15-37 - 15-37 - 15-37 Casing Hole Diameter Diameter Name (in) (in) 13.375 17.500 9.625 12.250 7.000 8.500 4.500 6.125 4.500 4.500 2.785 4.250 Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warninc - Depth Depth Distance (usft) from Plan (usft) (usft) (usft) (usft) 14,816.77 17,216.00 277.91 251.55 56.53 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 11/1012016 7:40:15AM Page 2 COMPASS 5000.1 Build 81B Out of range Out of range 13,534.62 13,550.00 42.44 8.54 34.95 Pass - Major Risk Out of range Out of range Out of range Out of range Out of range 14,591.46 11,813.00 1,040.95 236.56 804.45 Pass - Major Risk 15,025.00 12,425.00 549.15 258.08 290.36 Pass - Major Risk 14,675.00 12,250.00 480.52 207.45 271.07 Pass - Major Risk 14,188.15 11,825.00 1,055.81 209.87 846.84 Pass - Major Risk 14,175.00 11,900.00 1,019.11 216.41 800.87 Pass - Major Risk 14,200.00 11,800.00 1,092.50 204.75 885.35 Pass - Major Risk 15,675.00 11,056.00 1,706.78 253.76 1,450.56 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 11/1012016 7:40:15AM Page 2 COMPASS 5000.1 Build 81B reA .l BAKER HUGHES Well 15-16 Mean Sea Level 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Summary Lis DS 01 - L1-13 - L1-13 - L1-13 BP Obp Travelling Cylinder Report Company: NorthAmerica- ALASKA -BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 15 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 15-16 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 15-16C Database: Reference Design: 15-16C WP06 Offset TVD Reference: reA .l BAKER HUGHES Well 15-16 Mean Sea Level 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Summary Lis DS 01 - L1-13 - L1-13 - L1-13 Reference Offset Centre to No -Go Allowable Rule Assigned: Major Risk Offset Well Error., 0.00 usft Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Measured Offset Well - Wellbore - Design (usft) (usft) (usft) Offset (usft) Offset Wellbore Centre PB DS 15 Centre to No Go Allowable Warning Depth Depth Depth 15-37 - 15-37A- 15-37A 15,650.00 10,925.00 1,717.66 265.22 1,451.44 Pass - Major Risk 15-37 - 15-37APB1 - 15-37APB1 15,650.00 10,925.00 1,717.66 265.24 1,451.42 Pass - Major Risk 15-37 - 15-37B - 15-37B (usft) V) (usft) (usft) (in) Out of range 15-37 - 15-37C - 15-37C 15,625.00 13,475.00 1,107.89 232.22 874.39 Pass - Major Risk 15-43 - 15-43 - 15-43 -8.32 8,400.83 3,908.55 4.375 1,798.17 Out of range 15-44 - 15-44 - 15-44 13,875.00 8,648.19 15,550.00 8,798.38 55.82 Out of range 15-49 - 15-49 - 15-49 8,376.96 3,901.64 4.375 1,776.10 315.08 Out of range 15-49 - 15-49A - 15-49A 8,648.19 15,575.00 8,796.37 55.82 48.38 Out of range 15-49 - 15-49APB1 - 15-49APB1 3,894.56 4.375 1,754.17 315.19 1,442.26 Pass - Major Risk Out of range 15-49 - 15-49B - 15-49B 15,600.00 8,795.21 55.82 48.43 -8.41 Out of range 15-49 - 15-49C - 15-49C 4.375 1,732.41 315.31 1,419.49 Pass - Major Risk 13,875.00 Out of range 15-49 - 15-49PB1 - 15-49PB1 8,794.95 55.82 48.47 -8.39 8,305.24 Out of range Offset Design Lis DS 01 - L1-13 - L1-13 - L1-13 Offset Site Error: 0.00 usft Survey Program: 96-GYD-GC-SS, 899-MWD+IFR+MS-WOCA, 5237-MWD+IFR+MS-WOCA, 10754-INC+TREND, 10848-MWD+IFR+ Rule Assigned: Major Risk Offset Well Error., 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface + Offset Wellbore Centre Casing - Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NI -S +EI -W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) V) (usft) (usft) (in) (usft) (usft) (usft) 13,875.00 8,648.19 15,525.00 8,801.12 55.82 48.29 -8.32 8,400.83 3,908.55 4.375 1,798.17 314.97 1,488.24 Pass - Major Risk 13,875.00 8,648.19 15,550.00 8,798.38 55.82 48.34 -8.38 8,376.96 3,901.64 4.375 1,776.10 315.08 1,465.18 Pass - Major Risk 13,875.00 8,648.19 15,575.00 8,796.37 55.82 48.38 -8.41 8,353.07 3,894.56 4.375 1,754.17 315.19 1,442.26 Pass - Major Risk 13,875.00 8,648.19 15,600.00 8,795.21 55.82 48.43 -8.41 8,329.16 3,887.35 4.375 1,732.41 315.31 1,419.49 Pass - Major Risk 13,875.00 8,648.19 15,625.00 8,794.95 55.82 48.47 -8.39 8,305.24 3,880.09 4.375 1,710.82 315.42 1,396.89 Pass - Major Risk 13,875.00 8,648.19 15,650.00 8,795.56 55.82 48.52 -8.33 8,281.35 3,872.76 4.375 1,689.44 315.54 1,374.51 Pass - Major Risk 13,875.00 8,648.19 15,675.00 8,796.79 55.82 48.57 -8.26 8,257.62 3,885.00 4.375 1,668.47 315.67 1,352.50 Pass - Major Risk 13,886.06 8,648.91 15,700.00 8,798.46 55.78 48.62 -9.41 8,233.93 3,857.17 4.375 1,647.56 318.50 1,331.48 Pass - Major Risk 13,889.17 8,649.11 15,725.00 8,800.70 55.77 48.66 -9.64 8,210.31 3,849.31 4.375 1,626.95 319.37 1,310.09 Pass - Major Risk 13,900.00 8,649.80 15,750.00 8,803.41 55.73 48.71 -10.73 8,186.76 3,841.37 4.375 1,606.64 321.98 1,289.66 Pass - Major Risk 14,400.00 8,679.34 15,775.00 8,806.15 54.40 48.76 5.78 8,163.23 3,833.39 4.375 1,584.36 276.11 1,314.90 Pass - Major Risk 14,400.00 8,679.34 15,800.00 8,808.86 54.40 48.82 5.92 8,139.68 3,825.44 4.375 1,560.80 276.21 1,290.55 Pass - Major Risk 14,400.00 8,679.34 15,825.00 8,811.55 54.40 48.87 6.06 8,116.17 3,817.37 4.375 1,537.32 276.31 1,266.24 Pass - Major Risk 14,400.00 8,679.34 15,850.00 8,814.22 54.40 48.92 631 8,092.72 3,809.13 4.375 1,513.94 276.41 1,241.99 Pass - Major Risk 14,400.00 8,679.34 15,875.00 8,816.87 54.40 48.98 6.36 8,069.33 3,800.70 4.375 1,490.67 276.50 1,217.81 Pass - Major Risk 14,400.00 8,679.34 15,900.00 8,819.52 54.40 49.03 6.51 8,046.00 3,792.13 4.375 1,467.50 276.60 1,193.70 Pass - Major Risk 14,405.91 8,679.99 15,925.00 8,822.30 54.39 49.08 6.06 8,022.67 3,783.57 4.375 1,444.38 278.79 1,170.28 Pass - Major Risk 14,411.01 8,680.56 15,950.00 8,825.24 54.38 49.13 5.71 7,999.36 3,775.04 4.375 1,421.36 280.67 1,146.87 Pass - Major Risk 14,411.01 8,680.56 15,975.00 8,828.32 54.38 49.18 5.90 7,976.05 3,766.54 4.375 1,398.39 280.77 1,122.93 Pass - Major Risk 14,411.01 8,680.56 16,000.00 8,831.48 54.38 49.23 6.09 7,952.74 3,758.07 4.375 1,375.50 280.88 1,099.04 Pass- Major Risk 14,411.01 8,680.56 16,025.00 8,834.53 54.38 49.28 6.29 7,929.41 3,749.62 4.375 1,352.66 280.98 1,075.18 Pass - Major Risk 14,417.64 8,681.32 16,050.00 8,837.46 54.36 49.34 5.77 7,906.07 3,741.18 4.375 1,329.79 283.35 1,052.08 Pass - Major Risk 14,420.09 8,681.60 16,075.00 8,840.27 54.36 49.39 5.71 7,882.70 3,732.75 4.375 1,306.98 284.29 1,028.51 Pass - Major Risk 14,425.00 8,682.16 16,100.00 8,842.99 54.35 49.45 5.38 7,859.28 3,724.42 4.375 1,284.18 286.04 1,005.26 Pass - Major Risk 14,425.00 8,682.16 16,125.00 8,845.64 54.35 49.51 5.59 7,835.78 3,716.30 4.375 1,261.34 286.15 981.36 Pass - Major Risk 14,425.00 8,682.16 16,150.00 8,848.22 54.35 49.56 5.80 7,812.21 3,708.40 4.375 1,238.49 286.26 957.45 Pass - Major Risk 14,425.00 8,682.16 16,175.00 8,850.73 54.35 49.62 6.02 7,788.56 3,700.69 4.375 1,215.63 286.36 933.54 Pass - Major Risk 14,425.00 8,682.16 16,200.00 8,853.16 54.35 49.68 6.25 7,764.86 3,693.10 4.375 1,192.80 286.47 909.64 Pass - Major Risk 14,435.22 8,683.33 16,225.00 8,855.51 54.33 49.74 5.38 7,741.14 3,685.58 4.375 1,169.85 289.94 886.98 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 11/10/2016 7:40,:15AM Page 3 COMPASS 5000.1 Build 81B pZINC Company: Project: Reference Site: Site Error: Reference Well: Well Error: Reference Wellbore Reference Design: North America - ALASKA - BP Prudhoe Bay PB DS 15 0.00 usft 15-16 0.00 usft 15-16C 15-16C WP06 BP Travelling Cylinder Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: ri.g BAKER HUGHES Well 15-16 Mean Sea Level 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to 15-16B @ 61.00usft (Nabors 7ES) Coordinates are relative to: 15-16 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Central Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 1.34 ° 1 Ladder Plot 0 3000 6000 9000 12000 15000 18000 Measured Depth LEGEND ,,. 15-36,15-366,15-36B V7 15-36,15-36BPB2,15-36BPB2 V6 —X— 15 -37,15 -37A,15 -37A V2 $ 15-36,15-36,15-36 V1 15-36,15-36BPB1,15-36BPB1 V8— 15-37,15-37APB1,15-37APB1 V1 $ 15-36,1536APB1,15-36APB1 V3 $ 15 -16,15 -16B,15 -16B VO 15-37,15-37,15-37V1 15 -36,15 -36A,15 -36A V2 $ 15 -37,15 -37C,15 -37C VO $ L1-13, L1-13, L1-13 VO CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 11/1012016 7:40:15AM Page 27 COMPASS 5000.1 Build 81B BP F/%g a 110+0 p Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 15 Site Error: 0.00 usft Reference Well: 15-16 Well Error: 0.00 usft Reference Wellbore 15-16C Reference Design: 15-16C WP06 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 15-16 Mean Sea Level 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to 15-16B @ 61.00usft (Nabors 7ES) Coordinates are relative to: 15-16 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Central Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 1.34 ° - Separation Factor plot I I 1 I I I I 9.00 I I I 1 I I - I 1 I I I I I I I p I I I I I I 6.00 -. I >- IZ- - - - - - - - - - -. - - - - - - - - - - - - - - I - - - - - - - - - - - - - - - - - - - - - - - f rn I I 1 I I i I I 3.00 I I I - -.- I I I I 0.00 0 3000 6000 9000 12000 15000 Meastred Depth LEGEND 15 -36,15 -36B,15 -36B V7 15-36,15-36BPB2,15-36BPB2 V6 -XF 15 -37,15 -37A,15 -37A V2 -e- 15-36,15-36,15-36V1 15-36,15-36BPB1,15-36BPB1 V8 15-37,15-37APB1,15-37APB1 V1 $ 15-36,15-36APB1,15-36APB1 V3 $ 15-16,15-166,15-16B VO 15-37,15-37,15-37V1 15 -36,15 -36A,15 -36A V2 $ 15 -37,15 -37C,15 -37C VO -$- L1-13, L1-13, L1-13 V0 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 11/10/2016 7:40:15AM Page 28 COMPASS 5000.1 Build 81B a- BP FUN pTravelling Cylinder Report BAKER h b HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 15 Site Error: 0.00 usft Reference Well: 15-16 Well Error: 0.00 usft Reference Wellbore 15-16C Reference Design: 15-16C WP06 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 15-16 Mean Sea Level 15-16B @ 61 00usft (Nabors 7ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum aference Depths are relative to 15-16B @ 61.00usft (Nabors 7ES) Coordinates are relative to: 15-16 ffset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 antral Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 1.34 300 270 240 i Travelling _Cylinder Po 21t_00 330 30 1800 - 14411 OTJ _ . 210 �� 150 2100 - 180 Azimuth from North [°] vs Centre to Centre Separation [1000 usft/in] LEGEND 1536,15 -36B,15 -36B V7 15-36,15-36BPB2,15-36BPB2 V6 -F 15 -37,15 -37A,15 -37A V2 -IES- 15-36,15-36,15-36 V1. 15-36,15-36BPB1,15-36BPB1 V8 - 15-37,15-37APB1,15-37APB1 V1 15-36,15-36.APB1,15-36APB1 V3 15-16,15-166,15-16B VO 15-37,15-37,15-37 V1 - - 15 -36,15 -36A,15 -36A V2 $ 1537,15 -37C,15 -37C VO $ 1-1-13,1-1-13,1-1-13 VO CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 11/10/2016 7:40-15AM Page 29 COMPASS 5000.1 Build 81B M3 Project: Prudhoel3; Site: PB DS 16 Well: 16-16 Wellbore: 16.16C Plan: 16.16C WP06 Plus 600@ M D (1i AY Axmb.toTnc NOM Maeretic N.M: ia.t0 Magnetic Feld WELLBORE DETAILS: 15-16C REFERENCEINFORM4TIINJ 15-16C Co-ordinate (NIE) Reference: Well 15-16, True Norlh Soergth:57557.5sn Varb.I(TVD) Reference: Mean Sea Leel i -16116-16C) lip AVb31.@ Noe: 111/201 Parent Wellbore: 15-168 Secfion (VS)Reference: Sbl-(O.00N, O.00E) M�sured Depth Reference: 15-1613061.0WO(Neb.. tel. Tle on MD: 13219.79 7ES) Cebubtion Method: Minimum Curvature Fe¢li— Idnn i.ep-i ri.I BAKER HUGHES tasang (iuu usmin) Mean Sea Level by North America - ALASKA - BP Prudhoe Bay PB DS 15 15-16 15-16C 15-16C WP06 Plus 500ft MD AOGCC Offset Well Report 10 November, 2016 BAKER HUGHES / Date 11/10/2016 1.0110. Z by N rH To Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 15 Site Error: 0.00usft Reference Well: 15-16 Well Error: 0.00usft Reference Wellbore 15-16C Reference Design: 15-16C WP06 Plus 500ft MD BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 15-16 Mean Sea Level 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Reference 15-16C WP06 Plus 500ft MD Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 13,219.79 to 16,597.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic Fels RAKER HUGHES Survey Tool Program Date 11/10/2016 From To (usft) (usft) Survey (Wellbore) Tool Name Description 90.00 4,540.00 15-16 Srvy 2 GYD CT CMS (15-16) GYD-CT-CMS Gyrodata cont.casing m/s 4,587.00 4,604.00 15-16BPB1 Srvy 1 Blind (15-16BPB1) BLIND Blind drilling 4,626.54 4,720.47 15-16BPB1Srvy 21nc+Trend(15-16BPB1 INC+TREND Inclinometer + known azi trend 4,813.93 12,335.13 15-16BPB1 Srvy 3 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 12,409.41 12,912.00 15-16BPB1 Srvy 4 MWD+IFR+MS (15-16B MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 12,938.02 13,219.79 15-16B Spry 1 MWD+IFR+MS (15-16B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 13,219.79 16,597.00 15-16C WP06 Plus 500ft MD (15-16C) MWD MWD - Standard Summary Site Name Offset Well - Wellbore - Design Lis DS 01 PB DS 15 15-16 - 15-16B - 15-16B 15-16 - 15-16C - 15-16C WP06 Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 13,534.62 13,550.00 42.44 16,097.00 16,097.00 0.00 11/10/2016 10:08:26AM Page 2 of 7 COMPASS 5000.1 Build 818 Offset Design PB DS 15 - 15-16 - 15-16B - 15-16B Survey Program: 90-GYD-CT-CMS, 4587 -BLIND, 4627-INC+TREND, 4814-MWD+IFR+MS-WOCA, 12409-MWD+IFR+MS-W0CA, 12 Reference Offset Measured Vertical Measured Vertical Offset Wellbore Centre Centre to Depth Depth Depth Depth +NIS +EI -W Centre (usft) (usft) (usft) (usft) (usft) (usft) (usft) 13,225.00 8,598.88 13,225.00 8,598.88 6,316.74 4,714.58 0.00 13,250.00 8,603.34 13,250.00 8,603.34 6,341.03 4,710.72 0.00 13,275.00 8,607.70 13,275.00 8,607.70 6,365.34 4,706.83 0.00 13,300.00 8,611.91 13,300.00 8,611.91 6,389.68 4,702.94 0.00 13,324.99 8,615.69 13,325.00 8,615.92 6,413.98 4,698.68 0.27 13,349.92 8,618.19 13,350.00 8,619.31 6,438.17 4,693.36 1.21 13,374.71 8,619.19 13,375.00 8,621.96 6,462.20 4,687.02 3.04 13,399.41 8,619.78 13,400.00 8,623.65 6,486.16 4,680.10 5.19 13,423.65 8,620.51 13,425.00 8,624.34 6,510.10 4,672.93 8.42 13,447.26 8,621.34 13,450.00 8,624.55 6,533.80 4,664.97 13.20 13,470.26 8,622.26 13,475.00 8,624.40 6,557.04 4,655.77 18.89 13,492.53 8,623.26 13,500.00 8,624.11 6,579.89 4,645.64 25.71 13,513.98 8,624.31 13,525.00 8,623.91 6,602.39 4,634.75 33.64 13,534.62 8,625.40 13,550.00 8,623.91 6,624.46 4,623.00 42.44 13,554.47 8,626.52 13,575.00 8,623.96 6,646.02 4,610.34 51.93 13,573.54 8,627.64 13,600.00 8,624.28 6,667.05 4,596.84 62.06 13,591.79 8,628.77 13,625.00 8,624.71 6,687.58 4,582.59 72.85 13,609.32 8,629.90 13,650.00 8,625.22 6,707.49 4,567.48 84.09 13,626.28 8,631.01 13,675.00 8,625.92 6,726.56 4,551.33 95.47 13,642.64 8,632.12 13,700.00 8,626.70 6,744.82 4,534.28 107.07 13,658.29 8,633.20 13,725.00 8,627.36 6,762.58 4,516.70 119.25 13,675.00 8,634.37 13,750.00 8,627.99 6,780.13 4,498.90 132.35 13,687.87 8,635.28 13,775.00 8,628.68 6,797.68 4,481.11 146.44 13,703.02 8,636.36 13,800.00 8,629.35 6,815.35 4,46344 161.39 13,717.28 8,637.37 13,825.00 8,629.87 6,833.31 4,446.06 177.28 13,730.81 8,638.32 13,850.00 8,630.38 6,851.33 4,428.73 193.78 rias BAKER HUGHES 11/10/2016 10:08:26AM Page 3 of 7 COMPASS 5000.1 Build 81B BP '®jGN S by Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site Error: 0.00usft North Reference: True Reference Well: 15-16 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 15-16C Database: EDM R5K- Alaska PROD - ANCP1 Reference Design: 15-16C WP06 Pius 500ft MD Offset ND Reference: Offset Datum Offset Design PB DS 15 - 15-16 - 15-16B - 15-16B Survey Program: 90-GYD-CT-CMS, 4587 -BLIND, 4627-INC+TREND, 4814-MWD+IFR+MS-WOCA, 12409-MWD+IFR+MS-W0CA, 12 Reference Offset Measured Vertical Measured Vertical Offset Wellbore Centre Centre to Depth Depth Depth Depth +NIS +EI -W Centre (usft) (usft) (usft) (usft) (usft) (usft) (usft) 13,225.00 8,598.88 13,225.00 8,598.88 6,316.74 4,714.58 0.00 13,250.00 8,603.34 13,250.00 8,603.34 6,341.03 4,710.72 0.00 13,275.00 8,607.70 13,275.00 8,607.70 6,365.34 4,706.83 0.00 13,300.00 8,611.91 13,300.00 8,611.91 6,389.68 4,702.94 0.00 13,324.99 8,615.69 13,325.00 8,615.92 6,413.98 4,698.68 0.27 13,349.92 8,618.19 13,350.00 8,619.31 6,438.17 4,693.36 1.21 13,374.71 8,619.19 13,375.00 8,621.96 6,462.20 4,687.02 3.04 13,399.41 8,619.78 13,400.00 8,623.65 6,486.16 4,680.10 5.19 13,423.65 8,620.51 13,425.00 8,624.34 6,510.10 4,672.93 8.42 13,447.26 8,621.34 13,450.00 8,624.55 6,533.80 4,664.97 13.20 13,470.26 8,622.26 13,475.00 8,624.40 6,557.04 4,655.77 18.89 13,492.53 8,623.26 13,500.00 8,624.11 6,579.89 4,645.64 25.71 13,513.98 8,624.31 13,525.00 8,623.91 6,602.39 4,634.75 33.64 13,534.62 8,625.40 13,550.00 8,623.91 6,624.46 4,623.00 42.44 13,554.47 8,626.52 13,575.00 8,623.96 6,646.02 4,610.34 51.93 13,573.54 8,627.64 13,600.00 8,624.28 6,667.05 4,596.84 62.06 13,591.79 8,628.77 13,625.00 8,624.71 6,687.58 4,582.59 72.85 13,609.32 8,629.90 13,650.00 8,625.22 6,707.49 4,567.48 84.09 13,626.28 8,631.01 13,675.00 8,625.92 6,726.56 4,551.33 95.47 13,642.64 8,632.12 13,700.00 8,626.70 6,744.82 4,534.28 107.07 13,658.29 8,633.20 13,725.00 8,627.36 6,762.58 4,516.70 119.25 13,675.00 8,634.37 13,750.00 8,627.99 6,780.13 4,498.90 132.35 13,687.87 8,635.28 13,775.00 8,628.68 6,797.68 4,481.11 146.44 13,703.02 8,636.36 13,800.00 8,629.35 6,815.35 4,46344 161.39 13,717.28 8,637.37 13,825.00 8,629.87 6,833.31 4,446.06 177.28 13,730.81 8,638.32 13,850.00 8,630.38 6,851.33 4,428.73 193.78 rias BAKER HUGHES 11/10/2016 10:08:26AM Page 3 of 7 COMPASS 5000.1 Build 81B .,Bri.2 by Anticollision Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site Error: 0.00usft North Reference: True Reference Well: 15-16 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 15-16C Database: EDM R5K-Alaska PROD -ANCP1 Reference Design: 15-16C WP06 Plus 500ft MD Offset TVD Reference: Offset Datum Offset Design PB DS 15 - 15-16 - 15-16C - 15-16C WP06 Survey Program: 90-GYD-CT-CMS, 4587 -BLIND, 4627-INC+TREND, 4814-MWD+IFR+MS-WOCA, 12409-MWD+IFR+MS-W0CA, 12 Reference Offset Measured Vertical Measured Vertical Offset Wellbore Centre Centre to Depth Depth Depth Depth +N! -S +E/ -W Centre (usft) (usft) (usft) (usft) (usft) (usft) (usft) 13,225.00 8,598.88 13,225.00 8,598.88 6,316.74 4,714.58 0.00 13,250.00 8,603.34 13,250.00 8,603.34 6,341.03 4,710.72 0.00 13,275.00 8,607.70 13,275.00 8,607.70 6,365.34 4,706.83 0.00 13,300.00 8,611.91 13,300.00 8,611.91 6,389.68 4,702.94 0.00 13,325.00 8,615.69 13,325.00 8,615.69 6,413.99 4,698.55 0.00 13,350.00 8,618.20 13,350.00 8,618.20 6,438.21 4,692.88 0.00 13,375.00 8,619.20 13,375.00 8,619.20 6,462.12 4,685.70 0.00 13,400.00 8,619.80 13,400.00 8,619.80 6,485.41 4,676.66 0.00 13,425.00 8,620.55 13,425.00 8,620.55 6,507.83 4,665.62 0.00 13,450.00 8,621.44 13,450.00 8,621.44 6,529.19 4,652.68 0.00 13,475.00 8,622.46 13,475.00 8,622.46 6,549.34 4,637.94 0.00 13,500.00 8,623.61 13,500.00 8,623.61 6,568.12 4,621.49 0.00 13,525.00 8,624.88 13,525.00 8,624.88. 6,585.40 4,603.48 0.00 13,550.00 8,626.26 13,550.00 8,626.26 6,601.04 4,584.03 0.00 13,575.00 8,627.73 13,575.00 8,627.73 6,614.92 4,563.30 0.00 13,600.00 8,629.29 13,600.00 8,629.29 6,626.93 4,541.44 0.00 13,625.00 8,630.93 13,625.00 8,630.93 6,636.99 4,518.62 0.00 13,650.00 8,632.62 13,650.00 8,632.62 6,645.02 4,495.02 0.00 13,675.00 8,634.37 13,675.00 8,634.37 6,650.95 4,470.80 0.00 13,700.00 8,636.14 13,700.00 8,636.14 6,654.99 4,446.20 0.00 13,725.00 8,637.91 13,725.00 8,637.91 6,657.70 4,421.41 0.00 13,750.00 8,639.68 13,750.00 8,639.68 6,659.11 4,396.52 0.00 13,775.00 8,641.43 13,775.00 8,641.43 6,659.21 4,371.58 0.00 13,800.00 8,643.16 13,800.00 8,643.16 6,658.01 4,346.67 0.00 13,825.00 8,644.86 13,825.00 8,644.86 6,655.49 4,321.86 0.00 13,850.00 8,646.54 13,850.00 8,646.54 6,651.68 4,297.21 0.00 13,875.00 8,648.19 13,875.00 8,648.19 6,646.59 4,272.80 0.00 13,900.00 8,649.80 13,900.00 8,649.80 6,640.21 4,248.68 0.00 13,925.00 8,651.37 13,925.00 8,651.37 6,632.59 4,224.93 0.00 13,950.00 8,652.90 13,950.00 8,652.90 6,623.72 4,201.60 0.00 13,975.00 8,654.37 13,975.00 8,654.37 6,613.65 4,178.77 0.00 14,000.00 8,655.81 14,000.00 8,655.81 6,603.07 4,156.17 0.00 14,025.00 8,657.24 14,025.00 8,657.24 6,593.62 4,133.07 0.00 14,050.00 8,658.67 14,050.00 8,658.67 6,585.40 4,109.51 0.00 14,075.00 8,660.09 14,075.00 8,660.09 6,578.42 4,085.55 0.00 14,100.00 8,661.49 14,100.00 8,661.49 6,572.70 4,061.25 0.00 14,125.00 8,662.87 14,125.00 8,662.87 6,568.27 4,036.69 0.00 14,150.00 8,664.23 14,150.00 8,664.23 6,565.13 4,011.93 0.00 14,175.00 8,665.56 14,175.00 8,665.56 6,563.29 3,987.03 0.00 14,200.00 8,666.87 14,200.00 8,666.87 6,562.76 3,962.08 0.00 14,225.00 8,668.14 14,225.00 8,668.14 6,563.54 3,937.12 0.00 14,250.00 8,669.37 14,250.00 8,669.37 6,565.62 3,912.24 0.00 14,275.00 8,670.56 14,275.00 8,670.56 6,569.00 3,887.51 0.00 14,300.00 8,671.71 14,300.00 8,671.71 6,573.68 3,862.98 0.00 14,325.00 8,673.02 14,325.00 8,673.02 6,578.48 3,838.48 0.00 14,350.00 8,674.74 14,350.00 8,674.74 6,582.06 3,813.80 0.00 14,375.00 8,676.84 14,375.00 8,676.84 6,584.39 3,789.00 0.00 14,400.00 8,679.34 14,400.00 8,679.34 6,585.47 3,764.15 0.00 1111012016 10.08:26AM Page 4 of 7 COMPASS 5000.1 Build 81B 400 PB DS 15 - 15-16 - 15-16C - 15-16C WP06 BP 4627-INC+TREND, 4814-MWD+IFR+M8-W0CA, 'Lo p Reference Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site Error: 0 00usft North Reference: True Reference Well: 15-16 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 15-16C Database: EDM R5K-Alaska PROD -ANCP1 Reference Design: 15-16C WP06 Plus 500ft MD Offset TVD Reference: Offset Datum WE rag BAKER HUGHES Offset Design PB DS 15 - 15-16 - 15-16C - 15-16C WP06 Survey Program: 90-GYD-CT-CMS, 4587 -BLIND, 4627-INC+TREND, 4814-MWD+IFR+M8-W0CA, 12409-MWD+IFR+MS-WOCA, 12 Reference Offset Measured Vertical Measured Vertical Offset Wellbore Centre Centre to Depth Depth Depth Depth +N/.S +EI -W Centre (usft) (usft) (usft) (usft) (usft) (usft) (usft) 14,425.00 8,682.16 14,425.00 8,682.16 6,585.29 3,739.32 0.00 14,450.00 8,685.02 14,450.00 8,685.02 6,583.81 3,714.53 0.00 14,475.00 8,687.86 14,475.00 8,687.86 6,581.03 3,689.85 0.00 14,500.00 8,690.68 14,500.00 8,690.68 6,576.95 3,665.35 0.00 14,525.00 8,693.47 14,525.00 8,693.47 6,571.59 3,641.09 0.00 14,550.00 8,696.05 14,550.00 8,696.05 6,565.63 3,616.95 0.00 14,575.00 8,698.00 14,575.00 8,698.00 6,560.69 3,592.53 0.00 14,600.00 8,699.28 14,600.00 8,699.28 6,556.86 3,567.86 0.00 14,625.00 8,699.90 14,625.00 8,699.90 6,554.14 3,543.02 0.00 14,650.00 8,699.89 14,650.00 8,699.89 6,552.56 3,518.07 0.00 14,675.00 8,699.46 14,675.00 8,699.46 6,552.22 3,493.08 0.00 14,700.00 8,698.62 14,700.00 8,698.62 6,553.12 3,468.11 0.00 14,725.00 8,697.38 14,725.00 8,697.38 6,555.26 3,443.24 0.00 14,750.00 8,695.75 14,750.00 8,695.75 6,558.64 3,418.52 0.00 14,775.00 8,693.72 14,775.00 8,693.72 6,563.25 3,394.04 0.00 14,800.00 8,691.42 14,800.00 8,691.42 6,568.33 3,369.67 0.00 14,825.00 8,689.12 14,825.00 8,689.12 6,572.19 3,345.08 0.00 14,850.00 8,686.82 14,850.00 8,686.82 6,574.74 3,320.32 0.00 14,875.00 8,684.55 14,875.00 8,684.55 6,576.00 3,295.46 0.00 14,900.00 8,682.41 14,900.00 8,682.41 6,575.97 3,270.55 0.00 14,925.00 8,680.67 14,925.00 8,680.67 6,574.69 3,245.65 0.00 14,950.00 8,679.34 14,950.00 8,679.34 6,572.17 3,220.81 0.00 14,975.00 8,678.42 14,975.00 8,678.42 6,568.41 3,196.12 0.00 15,000.00 8,677.92 15,000.00 8,677.92 6,563.44 3,171.63 0.00 15,025.00 8,677.83 15,025.00 8,677.83 6,557.38 3,147.37 0.00 15,050.00 8,677.83 15,050.00 8,677.83 6,552.01 3,122.96 0.00 15,075.00 8,677.83 15,075.00 8,677.83 6,547.93 3,098.30 0.00 15,100.00 8,677.83 15,100.00 8,677.83 6,545.14 3,073.46 0.00 15,125.00 8,677.83 15,125.00 8,677.83 6,543.66 3,048.50 0.00 15,150.00 8,677.83 15,150.00 8,677.83 6,543.48 3,023.51 0.00 15,175.00 8,677.83 15,175.00 8,677.83 6,544.62 2,998.54 0.00 15,200.00 8,677.83 15,200.00 8,677.83 6,547.05 2,973.66 0.00 15,225.00 8,677.83 15,225.00 8,677.83 6,550.79 2,948.94 0.00 15,250.00 8,677.83 15,250.00 8,677.83 6,555.82 2,924.45 0.00 15,275.00 8,677.83 15,275.00 8,677.83 6,562.12 2,900.26 0.00 15,300.00 8,677.83 15,300.00 8,677.83 6,568.61 2,876.13 0.00 15,325.00 8,677.83 15,325.00 8,677.83 6,573.85 2,851.68 0.00 15,350.00 8,677.83 15,350.00 8,677.83 6,577.79 2,827.00 0.00 15,375.00 8,677.83 15,375.00 8,677.83 6,580.44 2,802.14 0.00 15,400.00 8,677.83 15,400.00 8,677.83 6,581.78 2,777.18 0.00 15,425.00 8,677.83 15,425.00 8,677.83 6,581.81 2,752.18 0.00 15,450.00 8,677.83 15,450.00 8,677.83 6,580.54 2,727.22 0.00 15,475.00 8,677.83 15,475.00 8,677.83 6,577.96 2,702.35 0.00 15,500.00 8,677.83 15,500.00 8,677.83 6,574.09 2,677.66 0.00 15,525.00 8,677.83 15,525.00 8,677.83 6,568.92 2,653.20 0.00 15,550.00 8,677.83 15,550.00 8,677.83 6,562.49 2,629.05 0.00 15,575.00 8,677.82 15,575.00 8,677.82 6,555.44 2,605.06 0.00 15,600.00 8,677.79 15,600.00 8,677.79 6,549.56 2,580.77 0.00 11/10/2016 10:0826AM Page 5 of 7 COMPASS 5000.1 Build 81B t 4 by BP Anticollision Report MH* Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 15-16 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB DS 15 MD Reference: 15-16B @ 61.00usft (Nabors 7ES) Site Error: 0.00usft North Reference: True Reference Well: 15-16 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore 15-16C Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: 15-16C WP06 Plus 500ft MD Offset ND Reference: Offset Datum Offset Design PB DS 15 - 15-16 - 15-16C - 15-16C WP06 survey Program: 90-GYD-CT-CMS, 4587 -BLIND, 4627-INC+TREND, 4814-MWD+IFR+MS-W0CA, 12409-MW0+IFR+MS-W0CA, 12 Reference Offset Measured Vertical Measured Vertical Offset Wellbore Centre Centre to Depth Depth Depth Depth +N/ -S +E/ -W Centre (usft) (usft) (usft) (usft) (usft) (usft) (usft) 15,625.00 8,677.74 15,625.00 8,677.74 6,544.97 2,556.20 0.00 15,650.00 8,677.67 15,650.00 8,677.67 6,541.66 2,531.42 0.00 15,675.00 8,677.57 15,675.00 8,677.57 6,539.65 2,506.50 0.00 15,700.00 8,677.45 15,700.00 8,677.45 6,538.95 2,481.51 0.00 15,725.00 8,677.31 15,725.00 8,677.31 6,539.56 2,456.53 0.00 15,750.00 8,677,15 15,750.00 8,677.15 6,541.48 2,431.60 0.00 15,775.00 8,676.97 15,775.00 8,676.97 6,544.70 2,406.81 0.00 15,800.00 8,676.77 15,800.00 8,676.77 6,549.21 2,382.23 0.00 15,825.00 8,676.55 15,825.00 8,676.55 6,555.00 2,357.91 0.00 15,850.00 8,676.31 15,850.00 8,676.31 6,561.71 2,333.83 0.00 15,875.00 8,676.07 15,875.00 8,676.07 6,567.45 2,309.50 0.00 15,900.00 8,675.83 15,900.00 8,675.83 6,571.91 2,284.91 0.00 15,925.00 8,675.59 15,925.00 8,675.59 6,575.08 2,260.11 0.00 15,950.00 8,675.35 15,950.00 8,675.35 6,576.94 2,235.19 0.00 15,975.00 8,675.12 15,975.00 8,675.12 6,577.50 2,210.20 0.00 16,000.00 8,674.89 16,000.00 8,674.89 6,576.74 2,185.21 0.00 16,025.00 8,674.66 16,025.00 8,674.66 6,574.68 2,160.30 0.00 16,050.00 8,674.44 16,050.00 8,674.44 6,571.32 2,135.53 0.00 16,075.00 8,674.23 16,075.00 8,674,23 6,566.67 2,110.97 0.00 16,097.00 8,674.04 16,097.00 8,674.04 6,561.52 2,089.59 0.00 ri.a BAKER HUGHES 11/10/2016 10:08:26AM Page 6 of 7 COMPASS 5000.1 Build 81B e4o' BP ZrN Anticollision Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 15 Site Error: 0.00usft Reference Well: 15-16 Well Error: 0.00usft Reference Wellbore 15-16C Reference Design: 15-16C WP06 Plus 500ft MD Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 15-16 Mean Sea Level 15-16B @ 61.00usft (Nabors 7ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to 15-16B @ 61.00usft (Nabors 7ES) Coordinates are relative to: 15-16 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Central Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 1.34° 1111012016 10:08.26AM Page 7 of 7 COMPASS 5000.1 Build 81B NORDIC CTD UNIT # 2 CHOKE / REEL / CIRCULATION MANIFOLD DIAGRAM Choke Pinel Standpipe 2" Circulation Line Driller Gaupe------MM 15 MM Manual Choke 11 BOP 26 1 CIRCULATING MANIFOLD 'MMm 1014810148MM 16 8 MM9 gop � lista 0 n W\� I Ur ® B SLB Transducer MM OP 6 BOP 282] { PVT Benson � I MM BOP 10 Baker Choke MM 13 MM4 MM 17 Rev Cir Line Last Update 23-Seo-13 fAlr B/ow down MM14 BOP I� BBnd/Shear Undated by Mad Ross IA Removed lower set MM3 BOP 12 M C7 Pipe/slip BOP 25 BOP 24 BOP 13 BOP 19 / KI LL EIDE KI LL SI DE CHECK Coiled Tubing MM 18 VALE L MANUAL MANUAL BOP 20 / VALVE VALVE BOP 13 li BHA Pipe/slip BOP 21 CHOKE SIDE f ' as rChoke / MANUAL VALVE MP2 �'� / 7�k BHAPipe/slip �� BOP 22 CHOKE HCR VALVE — — _ — _ — — _ — — — — MP1 Kill Line — — Py HP11 HP10 Trandu'$era.. COILED TUBING ' / Choke Una CIRCULATING SYSTEM T v 1 // ' BOP 15 VBR's HP 14 HPI — — — — — — / 1-- CSM 1 CSM 2 1 Kill Line —� P19 HP9 HP6 ' BOP 16 111 CTPipe/Slip / To Valve Inner Reel/ I ,m. .... r "^ `� BOP 18 .� \ HHIP 13 HP7 HPS HP4 MPJ / I CSM3 CSM4 BOP 17, / I CSM 5~ €,BOOP4 ,y MP 12 HP2 HPI CSM7 BOPS i HP 18 CSM6� BOPS � cement line N2 SLB / I \ BOP 2 NTri Flow CM BS CHOKE MANIFOLD �r �� tl BOP 1 6 BOP HP 17 2 / t GaugMGS Gaulle � CM 29 GAS BUSTER I ® pp--..�� BOP 30 Test Pump Inlet CM 30 �. / 11M f 1 CM3 Flo 4Wav � ®' BOP 29 i ® N supe Pat all, / I Wav Bltao ck CM14 CM1 CM CM24 Note: C C 5 SW-6 ® C 1 PB2 li9uid Baker Choke Line leg is from wal ° PB3 y high CM13 CM7 I CMiS TCM2 ' CM28 CM 33 / B1CM21 ' CM 31 CM4 CM17 CIO M CM 25 CM20 CM22 CM23 CM28 CM 32 / / CUTTINGS BOX / CM27 CMi6 CM79 / TIGER TANK f — — — — — — — — — — — — — — — — — — — — — — — — — — — — — w — — — — — — — — — — — — — — Nordic-Cellsla Confidentlsl_ TRANSMITTAL LETTER CHECKLIST WELL NAME: PTD: /Development _ Service Exploratory Stratigraphic Test Non -Conventional FIELD: �414��i.,CPOOL: �;� ,✓� Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where sample are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL, PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 PTD#:2161540 Company BP EXPLORATION (ALASKA) INC. Initial Class/Type Well Name: PRUDHOE BAY UNIT 15-16B Program DEV Well bore seg [] DEV/PEND GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D) NA Yes Planned drilling mud program (about 8.4 ppg) appears adequate to control operator's forecast 1 Permit fee attached NA pore pressure gradient (about 7.6 ppg). Should higher pore pressures be encountered, SFD 11/15/2016 38 2 Lease number appropriate Yes Surface Location lies within ADL028306; Top Prod Int & TD lie within ADL028303. Contact name/phone for weekly progress reports [exploratory only] 3 Unique well name and number Yes 4 Well located in a defined pool Yes PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341F 5 Well located proper distance from drilling unit boundary Yes CO 341 F, Rule 2: There shall be no restrictions as to well spacing except that no pay shall be 6 Well located proper distance from other wells Yes opened in a well closer than 500 feet to the boundary of the affected area. Planned well conforms to CO 7 Sufficient acreage available in drilling unit_ Yes 341F, Rule 2. _ 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Appr Date 11 Permit can be issued without conservation order Yes 12 Permit can be issued without administrative approval Yes SFD 11/15/2016 ' 13 Can permit be approved before 15 -day wait Yes 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre -produced injector: duration of pre -production less than 3 months (For service well only) NA 18 Conductor string provided NA Set in original well 15-16 Engineering 19 Surface casing protects all known USDWs NA Set in original well 15-16 20 CMT vol adequate to circulate on conductor & surf csg NA Set in original well 15-16 21 CMT vol adequate to tie-in long string to surf csg NA Set in original well 15-16 22 CMT will cover all known productive horizons Yes Sidetrack will cement liner in place 23 Casing designs adequate for C, T, B & permafrost NA 24 Adequate tankage or reserve pit Yes Steel Pits 25 If a re -drill, has a 10-403 for abandonment been approved Yes Sundry 316-585 26 Adequate wellbore separation proposed NA 27 If diverter required, does it meet regulations NA Wellhead in place, BOP to be installed Appr Date 28 Drilling fluid program schematic & equip list adequate Yes MJQ 11/16/2016 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP 2532 psi, 3500 psi BOP test 31 Choke manifold complies w/API RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes Coil tubing sidetrack in zone 33 Is presence of H2S gas probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No DS 15 wells are H2S-bearing. H2S measures are required. Geology 36 Data presented on potential overpressure zones Yes Planned drilling mud program (about 8.4 ppg) appears adequate to control operator's forecast Appr Date 37 Seismic analysis of shallow gas zones NA pore pressure gradient (about 7.6 ppg). Should higher pore pressures be encountered, SFD 11/15/2016 38 Seabed condition survey (if off -shore) NA BP has immediate access to nearby fluid mixing facilities. 39 Contact name/phone for weekly progress reports [exploratory only] NA Geologic Engineering Public Date: Date Date Commissioner: Commissioner: Com sio