Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-119 .P8( R-1613 Pro I I1 iii Regg, James B (DOA) From: AK, D&C Well Integrity Coordinator AKDCWelllnte rit Coordinator b .com .- Sent: Sunday, June 16, 2013 8:38 PM �f To: Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad RJ; Peru, Cale Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; Climer, Laurie A Subject: OPERABLE: Producer R-18B (PTD#1981190) Passing TIFL All, ,,/ Producer R-18B (PTD#1981190) successfully passed a TIFL on 06/16/2013, confirming the integrity of two barriers.At this time the well is reclassified as Operable, and ms ay remain online. Thank you, Laurie Climer (.-111et'/1Ui Lic ti J)ishi ati) BP Alaska - Well Integrity CoordinatorHNED �� poi V Cec,�4nE �i,c,n WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator(crBP.com From: AK, D&C Well Integrity Coordinator Sent: Sunday, June 09, 2013 4:55 PM To: 'jim.regg @alaska.gov'; 'Schwartz, Guy L (DOA)'; AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C W' eline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, S GPB East Wells Opt Engr; AK, OPS Well Pad RJQ; Peru, Cale Cc: AK, D&C DHD Well Integrity Engineer; Holt, Ryan P; AK, D&C Well Inte• • Coordinator; Weiss,Troy D Subject: UNDER EVALUATION: Producer R-18B (PTD #1981190) Sustai •d Casing Pressure above MOASP All, Producer R-18B (PTD#1981190) has sustained inner annul casing pressure above MOASP reported on 06/06/2013. The pressures were found to be tubing/inner annulus/.•ter annulus of 2090/2090/510 psi. The well is reclassified as Under Evaluation and placed on a 28 day clock to f.• itate evaluation. Plan forward: 1. DHD: Place well on production an. .erform a TIFL A copy of the wellbore schematic an. 10 plot is included for reference. Please call with any questions. 1 Pau ,2-t6� !r 19€itcto • Regg, James B (DOA) From: AK, D&C Well Integrity Coordinator[AKDCWeIllntegrityCoordinator @bp.com] �� Sent: Sunday, June 09, 2013 4:55 PM To: Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad RJQ; Peru, Cale Cc: AK, D&C DHD Well Integrity Engineer; Holt, Ryan P; AK, D&C Well Integrity Coordinator; Weiss, Troy D Subject: UNDER EVALUATION: Producer R-18B (PTD#1981190) Sustained Casing Pressure above MOASP Attachments: Producer R-18B (PTD#1981190) TIO Plot.docx; Producer R-18B (PTD#1981190)Wellbore Schematic.pdf All, Producer R-18B (PTD#1981190) has sustained inner annulus casing pressure above MOASP reported on 06/06/2013. The pressures were found to be tubing/inner annulus/outer annulus of 2090/2090/510 psi. The well is reclassified as Under Evaluation and placed on a 28 day clock to facilitate evaluation. Plan forward: 1. DHD: Place well on production and perform a TIFL A copy of the wellbore schematic and TIO plot is included for reference. Please call with any questions. Thank you, SCANNED j Jack Disbrow I BP Alaska-Well Integrity Coordinator 4513= / Glob&Wens 6S 7C,--," Organizatior Office: 907.659.5102 _ WIC Email:AKDCWellIntegritvCoordinator @bp.com 1 • I M O ' o � M ,aust § M_ M_ O M C3 C3 a - o H ° W M N� O O O O O W 0) O as o H - - TREE= 6-3/8"CIW SAFETY N, .3: ORIGINAL WELLBOREJ PERFS P&A'D = MCEVOY BAKER R-1 8 B CHROME TBG&LNR*"" KB. DIAGRAM. ***4-1 l2" ACTUA OR B KB.ELEV= 49.03' BF.ELEV= 2078717 I KOP= 3150' 1 I 2214' H 5-1/2"HES X NIP,ID=4.562" I ° ? _Max Angle= 99 @ 12326' ' 20"INSULATED Datum MD= 9631 CONDUCTOR 2642' `—I9-5/8"DV PKRI Datum TVD= 8800'SS GAS LIFT MANDRELS 13-3/8"CSG,72#,L-80, ID=12.347" —I 2700' ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 3010 3010 7 CA-LB DOME RM 16 05/04/09 Minimum ID = 3.80" @ 9351' LI 5 5281 4973 41 CA-LB DOME RM 16 05/04/09 4-1/2" HES XN NIPPLE 4 7153 6491 17 KBG2-LS DOME INT 16 05/04/09 • 3 7915 7220 18 KBG2-LS DOME INT 16 05/04/09 2 8639 7912 18 KBG2-LS DOME INT 16 05/04/09 5-1/2"TBG, 17#,13CR, .0232 bpf,ID=4.892" --I 6203' I 1 9188 8434 17 KBG2-LS SO NT 24 08/07/11 9-5/8"X 7"BKR ZXP PKR/ —I 6301' \ /----"----1 6203' j—I5-1/2"X 4-1/2"XO, ID=3.875' I C. HMC HGR, ID=6.25" � ; 9-5/8" MILLOUT WINDOW(R-18B) 6487'-6532' ESTIMATED TOP OF CEMENT -I 6349' (P• •P. 9297' I—I4-1/2"HES X NIP, ID=3.813" I •• • PERFORATION SUMMARY '____.���___ 9307' I1PI<R,7"X4-1/2"BKRS-3 PROD REF LOG: SWS MWD/GR 08/13/98 ID=3.938" ANGLE AT TOP PERF: 21 @ 9550' 0 0 Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE I 9331' I-I4-1/2"HES X NIP,ID=3.813" 2-7/8" 6 9550-9570 O 03/24/01 2-7/8" 4 11225- 11250 O 02/23/00 M 9351' I—{4-1/2"HES XN NIP, 2-7/8" 4 11300- 11325 0 02/23/00 fni MILLED TO 3.80"(4/11/01) 2-7/8" 4 11325- 11350 0 02/23/00 ►•-•-•.' 9353' —jr"X 5"TIEBK SLV,ID=5.250" I 2-7/8" 4 11360- 11385 0 02/23/00 �����•f/� SLTD LNR 12171 - 13278 O 08/23/98 *�•.P:�•66' .1���.�_ 9361' I-7"x 5"ZXP PKR r.- �� j w/HMC LNR HGR, ID=4.438" ∎.�� , 9366' 1—I4-1/2"WLEG,ID=3.958"I ••1 -I ELMD NOT LOGGED I .� 9374' I—I5"X 4-1/2"XO, ID=3.938" 9-5/8"CSG,47#,L-80 BUTT,ID=8.681" H 9770' ��� �► I ■•'■•' I �4P- 6e-re f5; ∎.p 1 10 1 •4 . 1 .A 12129' —I4-1/2"HOWCO ES CEMENTER I 4-1/2"TBG, 12.6#,13-CR-80 NSCT, H 9366' 0 • .0152 bpf, ID=3.958" �-� 0 12142' —BKR PAYZONE"ECR' PKR,ID=4.00" 7"LNR,26#, L-80 BUTT, .0383 bpf, ID=6.276" H 9539' I I 4-1/2"SOLID LNR, 12.6#,13-CR-80 NSCT,.0152 bpf, ID=3.953" 12171' I ..p„, 13243'_-I PBTD I• •.•• •• 4-1/2”SLID LNR, 12.6#,13-CR,.0152 bpf,ID=3.958" I—I 13280' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 09/09/81 ORIGINAL COMPLETION 11/19/07 GS/PJC GLV C/O(11/08/07) WELL: R-18B 01/06/85 N18ES RWO 11/19/07 DSM/PJC TREE CORRECTIONS PERMIT No:"1981190 12/30/95 RRW CTD SIDETRACK"A" 06/04/09 CJN/TLH GLV CIO(05/04/09) API No: 50-029-20633-02 08/24/98 N2ES RWO-SIDETRACK"B" 08/15/11 JLJ/PJC GLV C/O(08/07/11) SEC 32,T12N,R13E,3406'SNL&3613'WE. 06/24/07 DLB/PJC 98 SIDETRACK CORRECTIONS 07/01/07 DLB/PJC LOC&PBTD CORRECTIONS BP Exploration(Alaska) Pisa. i -ib/S • Pmlq ( 6ll90 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [AKDCWelllntegrityCoordinator @bp.com] Sent: Tuesday, March 20, 2012 2:02 PM To: Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Well Pad RJQ; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad RJQ Cc: AK, D &C Well Integrity Coordinator; King, Whitney; Wills, Shane M; LeBaron, Michael J Subject: OPERABLE: Producer R -18B (PTD #1981190) Tubing Integrity Confirmed All, Producer R -18B (PTD #1981190) passed a TIFL on 03/11/2012 and passed an OART from 03/15 - 19.2012 with a pressure build up rate of 4 psi /day. The passing indicate two competent barriers in the wellbore, and a well manageable by bleeds for the OA buildup. The well is reclassified as Operable. Please call if you have any questions. Thank you, Gerald Murphy (alt. Mehreen Vazir) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 From: Reynolds, Charles (Alaska) Sent: Monday, March 05, 2012 3:14 PM To: AK, D &C Well Integrity Coordinator; 'Regg, James B (DOA)'; 'Schwartz, Guy L (De )'; AK, OPS GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Well Pad RJQ; AK, OPS P -•d Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services * perations Team Lead; AK, RES GPB West Wells Opt Engr Cc: Chan, Paul (PRA); Walker, Greg (D &C); Clingingsmith, Mike J; Olson, : ndrew Subject: UNDER EVALUATION: Producer R -18B (PTD #1981190) Sus • fined IA and OA Pressure Above MOASP All, Producer R -18B (PTD #1981190) has been found to have su : ained casing pressure on the IA and OA. The wellhead pressures were tubing /IA/OA equal to SSV/2120/1130 psi • 03/03/2012. The well has been reclassified as Under Evaluation and may be produced under a 28 -day clock. The plan forward is as follows: 1. D: Cold TIFL (Integrity engineer to call grease ' ew before the TIFL begins), 2. D: OART 2. WP: PPPOT -IC (pending OART results) A TIO plot and wellbore schematic hav= seen included for your reference. Thank you, Charles Reynolds Filling in for... Mehreen Vazir (Altcruare• Gerald :llurphv. 1 p --- 6 I ts!(R0 Regg, James B (DOA) From: Reynolds, Charles (Alaska) [Charles.Reynolds @bp.com] Sent: Monday, March 05, 2012 3:14 PM To: AK, D &C Well Integrity Coordinator; Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Well Pad RJQ; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr Cc: Chan, Paul (PRA); Walker, Greg (D &C); Clingingsmith, Mike J; Olson, Andrew Subject: UNDER EVALUATION: Producer R -18B (PTD #1981190) Sustained IA and OA Pressure Above MOASP Attachments: Producer R -18B (PTD #1981190) TIO.doc; R- 18B.pdf All, Producer R -18B (PTD #1981190) has been found to have sustained casing pressure on the IA and OA. The wellhead pressures were tubing /IA/OA equal to SSV/2120/1130 psi on 03/03/2012. The well has been reclassified as Under Evaluation and may be produced under a 28 -day clock. The plan forward is as follows: 1. D: Cold TIFL (Integrity engineer to call grease crew before the TIFL begins), 2. D: OART 2. WP: PPPOT -IC (pending OART results) - A TIO plot and wellbore schematic have been included for your reference. '" Thank you, :: { ..ANN DMAR a 1 2.0 SC'{' Charles Reynolds 6?p fr7, kiqr= 53toe1. Filling in for... Mehreeir Vazir ( -11 t<'rnarf t ; era1. urph Well Integrity Coordinator nab« V- re' BP Alaska Drilling & Wells 0-6 Well Integrity Office: 907.659.5102 Email: AKDCWelIlntegrityCoordinator @BP.com 1 PBU R -18B PTD #1981190 • 3/5/2012 TIO Pressures Plot Wet R -18 4,000 3,000 Tbg -F IA 2.000 - ■.•... •.. OA - OOk -1- 000A On 1,000 -+•-••-. I • 12/10/11 12/17/11 12/24/11 12/31/11 01/07/12 01/14/12 01/21/12 01/28/12 02/04/12 02/11/12 02/18/12 02/25/12 03/03/12 TREE = 6 -3/8" CIW ID SAFETY NOS: ORIGINAL W ELLBORE! PERFS P &A'D WELLHEAD MCEVOY BAKER • -1 8B B SHOWN LNR*** KB. DIAGRAM. * * *4 -1 /2" OR = CHROME TBG & KB. ELEV = 49.03' I BF. ELEV = 20.81' KOP= 3150' , 1 2214' H 5 -1/2" HES X NIP, ID = 4.562" I Max Angle '= 99 @ 12326' 20" INSULATED ? Datum MD = 9631 CONDUCTOR 2642' I—I9 -5/8" DV PKR I Datum ND = 8800' SS GAS LIFT MANDRELS 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2700' ST MD N D DEV TY PE V LV LATCH PORT DATE r , 6 3010 3010 7 CA -LB DOME RM 16 05/04/09 Minimum ID = 3.80" @ 9351' I 5 5281 4973 41 CA -LB DOME RM 16 05/04/09 V 4-1/2" /2" HES XN NIPPLE `1 4 7153 6491 17 KBG2 -LS DOME NT 16 05/04/09 111374-1f)-2-_, 3 7915 7220 18 KBG2 -LS DOME NT 16 05/04/09 5-3} Dr." 1 2 8639 7912 18 KBG2 -LS DOME INT 16 05/04/09 5 -1/2" TBG, 17 #, 13CR, .0232 bpf, ID = 4.892" I—f 6203' ( 1 9188 8434 17 KBG2 -LS SO INT 24 08/07/11 / s---- ' - - 1 6203' I-I -1/2" X 4 -1/2" XO, ID = 3.875' I 9 -5/8" X 7" BKR ZXP PKR/ H 6301' I r HMC HGR, ID = 6.25" 1 4 . � 9 -5/8" MILLOUT WINDOW (R -1813) 6487' - 6532' I ESTIMATED TOP OF CEMENT H 6349' 4 / A • 9297' 1-14-1/2" HES X NIP, ID = 3.813" I 4. •20_•2.02.2.■•■ PERFORATION SUMMARY ■ a zI 9307' 117" X 4 -1/2" BKR S -3 PROD REF LOG: SWS MWD /GR 08/13/98 ■ PKR, ID = 3.938" ANGLE AT TOP PERF: 21 © 9550' CI Note: Refer to Production DB for historical perf data I 9331' 1 4 -112" HES X NIP, ID = 3.813" SIZE SPF INTERVAL Opn /Sqz DATE 2 -7/8" 6 9550 - 9570 0 03/24/01 —.^ I 9351' �— 4-1/2" HES XN NIP, 2 -7/8" 4 11225 - 11250 0 02/23/00 2 -7/8" 4 11300 - 11325 0 02/23/00 = No 11. MILLED TO 3.80" (4/11/01) 2 -7/8" 4 11325 - 11350 0 02/23/00 • J 7' ��•������ X 5" TIEBK SLV, ID = 5.250" 2 -7/8" 4 11360 - 11385 0 02/23/00 �� ���� �I 9 353' I I SLTD LNR 12171 - 13278 0 08/23/98 ►.■...... 9361' 117" X 5" ZXP PKR , w / HMC LNR HGR, ID = 4.438" ♦• •:• 9366' I-14 -1/2" WLEG, ID = 3.958" I - ■ • • , I H ELMD NOT LOGGED I ■ 9374' H 5" X 4-1/2" X0, ID = 3.938" I • 19 -5/8" CSG, 47 #, L -80 BUTT, ID = 8.681" H 9770' 4 '` Ivl�i (P _ ��� • • +_�•_ .' iv ,. 12129' H 4 -1/2" HOWCO ES CEMENTER I 4 -1/2" TBG, 12.6 #, 13 -CR -80 NSCT, --I 9366' • .0152 bpf, ID = 3.958" 0 g — ) 12142' 1—I BKR PAYZONE "ECP" PKR, ID = 4.00" 17" LNR, 26 #, L -80 BUTT, .0383 bpf, ID = 6.276" H 9539' 14 -1/2" SOLID LNR, 12.6 #. 13 -CR -80 NSCT, .0152 bpf, ID = 3.953" I 12171' 1 � . ■•• 13243' H PBTD I • •*•i• 14 -1 /2" SLTD LNR, 12.6 #, 13 -C R, .0152 bpf, ID = 3.958" 1-1 13280' • • • DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 09/09/81 ORIGINAL COM PLETION 11/19/07 GS /PJC GLV C/O (11 /08/07) WELL: R -1813 01/06/85 N18ES RWO 11/19/07 DSM/PJC TREE CORRECTIONS PERMIT No: 1981190 12/30/95 RRW CTD SIDETRACK "A" 06/04/09 CJN/TLH GLV C/O (05/04/09) API No: 50- 029 - 20633 -02 08/24/98 N2ES RWO- SIDETRACK "B" 08/15/11 JLJ/ PJC GLV C/O (08/07/11) SEC 32, T12N, R13E, 3406' SNL & 3613' WEL 06/24/07 DLB /PJC 98 SIDETRACK CORRECTIONS 07/01/07 DLB /PJC LOC & PBTD CORRECTIONS BP Exploration (Alaska) OPERABLE: Producer R -18B (PTD #1190) Tubing Integrity Restored, IA. Manageable ... Page 1 o Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWeIIlntegrityCoordinator @bp.com] Sent: Sunday, August 21, 2011 7:41 AM To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Well Pad RJQ; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr Cc: King, Whitney; Arend, Jon (NORTHERN SOLUTIONS LLC); Chan, Paul (PRA); Reynolds, Charles (ALASKA) Subject: OPERABLE: Producer R -18B (PTD #1981190) Tubing Integrity Restored, IAxOA Manageable by Bleeds All, Producer R -18B (PTD #1981190) passed a TIFL after the orifice gas lift valve was changed out proving that tubing integrity is restored. An OA Repressurizaion Test was conducted 08718/2011 - 08/21/2011 and the BUR was —17 psi /day making it manageable by infrequent bleeds. The well has been reclassified as Operable. Thank you, Mehreen Vazir (Alternate: Gerald Murphy) Well Integrity Coordinator BP Alaska Drilling & Wells Well Integrity Office: 907.659.5102 Email: AKDCWeIIlntegrityCoordinator @BP.com From: AK, D &C Well Integrity Coordinator Sent: Tuesday, July 26, 2011 10:21 AM To: 'Maunder, Thomas E (DOA)'; 'Regg, James B (DOA)'; 'Schwartz, Guy L (DOA)'; AK, OPS GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Well Pad RJQ; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Sayed, Mohamed Cc: AK, D &C Well Integrity Coordinator; King, Whitney; Arend, Jon (NORTHERN SOLUTIONS LLC) Subject: UNDER EVALUATION: Producer R -18B (PTD #1981190) Sustained IA and OA Pressu - Above MOASP All, Producer R -18B (PTD #1981190) has been found to have su -ined casing pressure on the IA and OA. The wellhead pressures were tubing /IA/OA equal to 2150/ 10/1080 psi on 07/25/2011. The well has been reclassified as Under Evaluation and may be prod ' ed under a 28 -day clock. The plan forward is as follows: 1. DHD: TIFL 2. Wellhead: PPPOT -T and IC 3. DHD: OA repressurization test A TIO plot and wellbore schematic h- , e been included for your reference. « File: Producer R -18B (PTD #19:1190) TIO Plot.doc » « File: Producer R -18B (PTD #1981190) wellbore schematic.pdf » Thank you, Gerald Murphy (alt. Mehreen Vazir) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 8/26/2011 UNDER EVALUATION: Producer Rip (PTD #1981190) Sustained IA and Pressure Abo... Page 1 of 1 , Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [AKDCWelllntegrityCoordinator @bp.com] Sent: Tuesday, July 26, 2011 10:21 AM 1 -717bI To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Well Pad RJQ; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Sayed, Mohamed Cc: AK, D &C Well Integrity Coordinator; King, Whitney; Arend, Jon (NORTHERN SOLUTIONS LLC) Subject: UNDER EVALUATION: Producer R -18B (PTD #1981190) Sustained IA and OA Pressure Above MOASP Attachments: Producer R -18B (PTD #1981190) TIO Plot.doc; Producer R -18B (PTD #1981190) wellbore schematic.pdf All, Producer R -18B (PTD #1981190) has been found to have sustained casing pressure on the IA and OA. The wellhead pressures were tubing /IA/OA equal to 2150/2110/1080 psi on 07/25/2011. The well a been reclassified as Under Evaluation and may be produced under a 28 -day clock. The plan forward is as follows: 1. DHD: TIFL 2. Wellhead: PPPOT -T and IC .z 3. DHD: OA repressurization test A TIO plot and wellbore schematic have been included for your reference. «Producer R -18B (PTD #1981190) TIO Plot.doc» «Producer R -18B (PTD #1981190) wellbore schematic.pdf» Thank you, Gerald Murphy (alt. Mehreen Vazir) - 5C f ; 7 1, 0 (q%') Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 ! a .„ NED JUL 9 201; Pager (907) 659 -5100 Ext. 1154 j 61 N- 5CP 70 I W V' (t3%1 tJ 1?ic? 616-- fe-- Ca 41 — 7/28/2011 PBU R-18B PTD #1981190 7/26/2011 TIO Pressures Plot Welt R-18 4,000 3,000 —0— Tbg • —111— IA 2,000 -A- OA 00A —40— 000A 1..000 On 04/30/11 05/07/11 05/14/11 05/21/11 05/28/11 06/04/11 06/11/11 06/18/11 06/25/11 07/02/11 07/09/11 07/16/11 07/23/11 • TREE = 6-3/8" CM/ • SAFETY NOTikORIGINAL WELLBORE/ PERFS P&A'D WELLHEAD = MCEVOY W/CMT - NOT OWN ON DIAGRAM. ***4-1/2" 0 = - BAKER R-18B CHROME TBG & LNR*** KB. la.EV = — 49,0T BF. ELEV = 20.81' , KOP = 3150 2214' I-15-1/2" HES X NIP, ID = 4.562" I Max Angler 99 @ 12326' 20" INSULATED -- ._._. Datum MD = CONDUCTOR I 2642' H9-5/8" DV PKR Datum TVo= 8800' SS • 5 - Wpsis . Ar GAS LIFT MANDRELS 13-3/8" CSG, 72#, L-80, ID = 12.347' I--1 2700' I ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 3010 3010 7 CA-LB DOME RM 16 05/04/09 Minimum ID = 3.80" @ 9351' 5 5281 4973 41 CA-LB DOME RM 16 05/04/09 4-1/2" HES XN NIPPLE 4 7153 6491 17 KBG2-LS DOME NT 16 05/04/09 3 7915 7220 18 KBG2-LS DOME NT 16 05/04/09 2 8639 7912 18 KBG2-LS DOME NT 16 05/04/09 I 5-1/2" TBG, 17#, 13CR, .0232 bpf, ID = 4.892" H 6203' I 1 9188 8434 17 KBG2-LS SO INT 24 05/04/09 6203' H5-1/2" X 4-1/2" X0, ID = 3.875' i 9-5/8" X 7" BKR ZXP PKR/ H 6301' HMC HGR, ID = 6.25" -v. • • : 9-5/8" MILLOUT WINDOW (R-18B) 6487' - 6532' ESTIMATED TOP OF CEMENT H 6349' 4 4, ' „.„------ • , • 4, • 9297' 1-14-1/2" HES X NIP, ID = 3.813" I •• . 11111141111 9307' I 7" X 4-1/2" BKR S-3 PROD • . • ••■■ •• • •:. •• . •• • • . •••• •• . ••• •• , - PERFORATION SUMMARY •___ . a I 4 . i • . . . . . . ..•■ ...•■•■ REF LOG: SWS MWD/GR 08/13/98 ■IIIIIII■._ PKR, ID = 3.938" 10. F.74 ANGLE AT TOP PERF: 21 @ 9550' Note: Refer to Production DB for historical perf data I 9331' H4-1/2" HES X NIP, ID = 3.813" SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 6 9550 - 9570 0 03/24/01 2-7/8" 4 11225 - 11250 0 02/23/00 Mill I 9351' I- 4-1/2" HES XN NIP, 2-7/8" 4 11300 - 11325 0 02/23/00 Mai MILLED TO 3.80" (4/11/01) -Wriri- 2-7/8" 4 11325 - 11350 0 02/23/00 Ak • 4* * ki I 9353' H7" X 5" TIEBK SLV, ID = 5.250" I 2-7/8" 4 11360 - 11385 0 02/23/00 ...=-1 ■ • • 6 - A •• 1 • • t SLTD LNR 12171 - 13278 0 08/23/98 ,,,.....4 9361' I 7" X 5" ZXP PKR P;: FA tiii w / HMC LNR HGR, ID = 4.438" 9366' 1-14-1/2" WLEG, ID = 3.958" H ELMD NOT LOGGED I t 4 : ■■ I 9374' 1-15" X 4-1/2" XO, ID = 3.938" I I 9-5/8" CSG, 47#, L-80 BUTT, ID = 8.681" I-I 9770' I-A t 4 . 1 IA I 0 I Attlif -,-- 670fos.' 4 ' . ■ 0 I 0 I ••. ,.* 6,•_■ I I 12129' H4-1/2" HOWCO ES CEMENTER I 4-1/2" TBG, 12.6#, 13-C R-80 NSCT, H 9366' • • .0152 bpf, ID = 3.958" I 12142' I- BKR PAYZONE "ECP' Cii INA PKR, ID = 4.00" I 7" LNR, 26#, L-80 BUTT, .0383 bpf, ID = 6.276" 1—I 9539' - I I 4-1/2" SOLID LNR, 12.6#, 13-CR-80 NSCT, .0152 bpf, ID = 3.953" 1 12171' I ■ , r4; • , ■ S: I 4-1/2" SLTD LNR, 12.6#, 13-CR, .0152 bpf, ID = 3.958" ---I 13280' 13243' 1--I PSTD I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT - 09/09/81 ORIGINAL COMPLETION 11/19/07 GS/PJC GLV C/O (11/08/07) WELL: R-18B 01/06/85 N18ES RWO 11/19/07 DSM/PJC TREE CORRECTIONS PERMIT No: 1981190 12/30/95 RRW CT D SIDETRACK "A" 06/04/09 CJN/TLH GLV C/O (05/04/09) API No: 50-029-20633-02 - 08/24/98 N2ES RWO-SIDETRACK "B" SEC 32, T12N, R13E, 3406' SNL & 3613' WEL 06/24/07 - DLB/PJC98 SIDETRACK CORRECTIONS 07/01/07 DLB/PJC LOC & PBTD CORRECTIONS BP Exploration (Alaska) ka) 1 ~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 ~. .~~~ ~ ~ ~~~~ ;~': r~'~3~~ `~~~.1 ~ ~' i . ~.~ ~ ~ D ~ July 10, 2009 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB R-Pad Dear Mr. Maunder, . ~ ~~ ~~ , ~~ l Q ~ `v Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB R- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet~represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Torin Roschinger, at 659-5102. Sincerely, Anna Dube, P.E. BPXA, Well Integrity Coordinator • ~ BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) R-pad Date Revised 7/10/2009 Well Name API # PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbis ft na al R-02 50029203540000 1781000 125 NA 1.25 NA 6.8 5/11 /2009 R-03A 50029203640100 1981710 1.5 NA 1.5 NA 7.65 5/13/2009 R-04 50029203740000 1790380 2.25 NA 2.25 NA 13.6 5/13/2009 R-05A 50029203800100 1972500 0 NA 0 NA 3 5/13/2009 R-06A 50029203880100 1981270 0.75 NA 0.75 NA 13.17 5/13/2009 R-07A 50029205230100 2000100 2.25 NA 2.25 NA 43 5/11/2009 R-OS 50029205480000 1810010 0.25 NA 0.25 NA 1.7 6/12/2009 R-09A 50029206090100 1982330 3.25 NA 3.25 NA 17.85 5/14/2009 R-10 50029206180000 1810930 2 NA 2 NA 14.5 6/22/2009 R-11A 50029208930100 1982060 0.25 NA 0.25 NA 1.7 6/11/2009 R-12 50029209210000 1830350 0.25 NA 0.25 NA 1.7 6/12/2009 R-13 50029209290000 1830440 24 NA 24 NA 96.9 6/23/2009 R-14 50029209090100 2021560 0 NA 0 NA 0.04 5/18/2009 R-15A 50029209170100 1990360 0 NA 0 NA 1.7 5/18/2009 R-16 50029206860000 1811740 15 NA 15 NA 107.5 5/17/2009 R-17A 50029206770100 1981380 4 NA 4 NA 27.2 5/15/2009 R-1 SB 50029206330200 1981190 6.75 NA 6.75 NA 48.87 5/15/2009 R-19A 50029206370100 1971710 8.5 NA 8.5 NA 67.48 5/17/2009 R-21 50029209970000 1831200 0.25 NA 0.25 NA 3.4 6/13/2009 R-22 50029210050000 1831280 0.5 NA 0.5 NA 4.3 6/12/2009 R-23A 50029210130100 1972020 2.25 NA 2.25 NA 16.2 6/12/2009 R-24 50029212320000 1842160 9.5 NA 9.5 NA 37.4 6/12/2009 R-25A 50029222780100 1972300 0 NA 0 NA 1.7 5/18/2009 R-26A 50029215470000 1860370 0.75 NA 0.75 NA 4.3 6/22/2009 R-27 50029215570000 1860510 0.25 NA 025 NA 1.7 6/11/2009 R-29 50029222750100 1971070 20 3.9 1.25 NA 11.05 5/14/2009 R-31 A 50029222770100 2021500 1.5 NA 1.5 NA 8.5 5/11 /2009 R-32A 50029224130100 1980090 0.75 NA 0.75 NA 8.5 6/11 /2009 R-34 50029224080000 1931530 0 NA 0 NA 2.5 5/18/2009 R-35 50029224240000 1931810 0.25 NA 0.25 NA 1.7 5/11/2009 R-36 50029225220000 1941440 3.25 NA 3.25 NA 44.2 5/14/2009 R-39A 50029225260100 1960840 2 NA 2 NA 22.1 5/11/2009 R-40 50029229260000 1982000 1.5 NA 1.5 NA 6.8 5/14/2009 R-41 50029233990000 2081530 3.25 NA 3.25 NA 22.1 5/12/2009 ~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 June 26, 2009 ~ ~ ~1~ ~ A` $~ ~, ` Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of R-Pad Dear Mr. Maunder, ~ . .. ~. ~ .; .~ •k,~ ,1UL ~ ~ ZqO~ ~~~~~~ ~i~ ~ G~~ ~An~o ~om~~~~Q~ ~~c~or~~ Enclosed please find a spreadsheet with a list of wells from R-Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. ~~ As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, ~,i ~*r~ „ , ;1~~; ur`~t+~ l`~..` 3~~ ~ ii 1.:. .. Torin Roschinger , BPXA, Well Integrity Coordinator ~ BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) e ~ 17atp R-pad . 6/25/2009 Well Name PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al R-02 178f OOQ 1.25 NA 1.25 NA 6.8 5/11 /2009 R-03A 1981710 1.5 NA 1.5 NA 7.65 5/13/2009 R-04 1790380 225 NA 2.25 NA 13.6 5/13/2009 R-05A 1972500 0 NA 0 NA 3 5/13/2009 R-06A 1981270 0.75 NA 0.75 NA 13.17 5/13/2009 R-07A 2000100 2.25 NA 2.25 NA 43 5/11 /2009 R-08 1510010 0.25 NA 0.25 NA 1.7 6/12/2009 R-09A 1982330 3.25 NA 3.25 NA 17.85 5/14/2009 R-10 1810930 2 NA 2 NA 14.5 6/22/2009 R-11A 1982060 0.25 NA 0.25 NA 1.7 6/11/2009 R-12 1830350 0.25 NA 0.25 NA 1.7 6/12/2009 R-13 1830440 3.75 NA 3.75 NA 76.5 6/22/2009 R-14 2021560 0 NA 0 NA 0.04 5/18/2009 R-15A 1990360 0 NA 0 NA 1.7 5/18/2009 R-16 1811740 15 NA 15 NA 107.5 5/17/2009 R-17A 1981380 4 NA 4 NA 27.2 5/15/2009 R-18B 1981190 6.75 NA 6.75 NA 48.87 5/15/2009 R-19A 1971710 8.5 NA 8.5 NA 67.48 5/17/2009 R-21 1831200 0.25 NA 0.25 NA 3.4 6h 3/2009 R-22 1831280 0.5 NA 0.5 NA 4.3 6/12/2009 R-23A 1972020 2.25 NA 2.25 NA 16.2 6/12/2009 R-24 1842160 9.5 NA 9.5 NA 37.4 6/12/2009 R-25A 1972300 0 NA 0 NA 1.7 5/18/2009 R-26A 1860370 0.75 NA 0.75 NA 4.3 6/22/2009 R-27 1860510 0.25 NA 0.25 NA 1.7 6/11/2009 R-29 1971070 20 3.9 1.25 NA 11.05 5/14/2009 R-31A 2021500 1.5 NA 1.5 NA 8.5 5/11/2009 R-32A 1980090 0.75 NA 0.75 NA 8.5 6/11/2009 R-34 1931530 0 NA 0 NA 2.5 5/18/2009 R-35 1931810 0.25 NA 0.25 NA 1.7 5/11/2009 R-36 1941440 3.25 NA 3.25 NA 44.2 5/14/2009 R-39A 1960840 2 NA 2 NA 22.1 5/11 /2009 R-40 1982000 1.5 NA 1.5 NA 6.8 5/14/2009 R-41 2081530 3.25 NA 3.25 NA 22.1 5/12/2009 OPERABLE: R-18B (PTD #19~90) Tubing Integrity Restored • Page 1 of 2 Regg, James B (DOA) ~__ ~ ~ ~T..~ From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] I~~~~~,~~' Sent: Friday, May 08, 2009 7:47 PM ~ To: Regg, James B(DOA); Maunder, Thomas E(DOA); Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL; GPB, GC2 Wellpad Lead; GPB, Well Pad RJQ; Rossberg, R Steven Cc: Quy, Tiffany; Brown, Don L.; NSU, A~ Well Integrity Engineer Subject: OPERABLE: R-18B (PTD #1981190) Tubing Integrity Restored AI I, Weli R-18B (PTD #1981190) passed a TIFL after the as lift valves were changed out proving tubing integrity has been restored. The well has been rec assi ie as perable. Please let us know if you have any questions. Thank you, Anna ~Du6e, ~P. E. We11 Integrity Coardinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-510Q x1154 ~) r~py~ ~ ~ 4 ~'~~ ~ ~ ~ .€ L~U~!' ti s•~~°t~. t,~`~G;.~y,~ ~l)E:! s . From: NSU, ADW Well Integrity Engineer Sent: Saturday, April 18, 2009 7:20 PM To: 'Regg, ]ames B(DOA)'; 'Maunder, Thomas E(DOA)'; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL; GPB, GC2 Wellpad Lead; GPB, Well Pad RJQ; Rossberg, R Steven Cc: NSU, ADW Well Integrity Engineer; Roschinger, Torin T.; Brown, Don L. Subject: UNDER EVALUATION: R-186 (PTD #1981190) Sustained IA Pressure due to TxIA Communication AI I, Well R-186 (PTD #1981190) has been found to have sustained casing pressure on the IA. The well broke maximum operating pressure limits on 4/13/09 with TIO pressures of SSV/2020/140 psi. A TIFL was conducted on 4/18/09 that failed due to fluid movement and pressure build up confirming TxIA communication. The well has been reclassified as Under Evaluation and placed under the 28 day clock. The plan forward is as follows: 1. DHD: TIFL - FAILED 2. Slickline: C/O OGLV 3. DHD: Re-TIFL A TIO plot and wellbore schematic have been included for reference. / Piease let us know if there are any questions. Thank you, Anna ~Du6e, ~P. E. 7/24/2009 OPERABLE: R-18B (PTD #19~90) Tubing Integrity Restored • Page 2 of 2 Well Integrity Caordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 7/24/2009 PBU R-18B PTD #1981190 4/18/2009 TIO Pressures ~ ~ TREE = 6-318" CNV M ACTUA OR= BAKERI KB. ELEV = 49.03'' ~,. _....._._,,~ BF. F1EV = ..~~.~.,.~ 20.81''. KOP = _ 3150". Max Angle = 99 @ 12326' Datum MD = 9631 I Datum ND = 8800' SSI 20" INSULATm CONDUCTOR n ~J 13-3/8" CSG, 72#, ~-8Q ~D = 12.3Q7" 2700~ Minimum ID = 3.80" @ 9351' 4-1/2" H~S XN NIPPLE I 5-1/2" TBG, 17#, 13CR, .d232 bpf, ID = 4.$92" 9-5/8" X 7" BKR ZXP PKR! HMC HGR, ID = 6.25" ESTIMATED TOP OF CEMQVT PERFORATION SUMMARY REF LOG: SWS NM/D/GR 08/13/98 ANGLE RT TOP PERF: 21 @ 9550' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-718" 6 9550 - 9570 O 03/24/Q1 2-7/8" 4 11225 - 11250 O 02/23/00 2-718" 4 11300 - 11325 O 02l23/00 2-7t8" 4 11325 - 11350 O 02l23l00 2-7/8" 4 11360 - 11385 O 02/23/00 SLTD ~NR 12171 - 13278 O 08/23/98 9-5l8" CSG, 47#, L-80 BUTf, ID = 8.681" ~--~ 9770' 4-1/2" 1BG, 12.6#, 13-CR-80 NSCT, -j 9366, .Q152 bpf, ID = 3.958" 7" LNR, 26#, 1-80 BUTT, .d383 bpf, ID = 6.2~6" -r 9 4-1/Z" SOLID LNR, 12.6#, i3-CR-80 NSCT, .0152 bpf, ID = 3.953" ~--~ 12171 9307~ 7" X 4-1l2" BKR S-3 PROD PFCR, ID = 3.938_' g33~' 4-1/2" HES X NIP, ID = 3.813" 9351' 4-112" HES XN NIP, MILIED TO 3.80" (4/11/01) 9353~ 7" X 5" TIEf3K SIV, ID = 5.250" 9381' ~" x 5° zxP FxR w! HMC LNR HGR, ID = 4.438" 9366~ -r4-1/2" WLEG, ID = 3.958„ C~ ELMD NOT LOGGED 9374' S" X 4-1/2" XO, ID = 3.938" 12129~ --j4-1(2" HOWCO ES CEMENTER 121q.2' -~BKR PAYZONE "ECP" ~ PKR, ID = 4.00" 13243' I-I ~TD ~ 4-1/2" S~TD LNR, 12.6#, 13-CR, .0152 bpf, ID = 3.958" ( DATE REV BY COMMENTS DATE REV BY COMMENTS 09/09/81 ORIGINAL COM PLETION 06/24/07 DLB/PJC 98 SIDEi'RACK CORRECTIONS 01/0&/85 N18ES RWO 07/01l07 DLB/PJC LOC & PBTD CORRECTIUNS 12/34/95 RRW CTD SIDETRACK "A" 10/20/07 TEL/PJC GLV C/O 08/24/98 N2E5 RWO-SIDETRACK"B" 11(19/07 GS/PJC GLV C(O(11/08/07} 09/29/06 DLB/PJC GLV ND CORRECTIONS 11/19/07 DStvUPJC TREE CORRECTIONS 01i28107 KSB/TLH GLV C/O PRUDHOE BAY UNIT WELI: R-18B PERMIT No: ~19$1190 API No: 50-029-20633-02 SEC 32, T12N, R13E, 3406' SN~ & 3613' WE~ BP Expioration (Alaska) SAFETY : OF2IGINAL WELLBORE! PERFS P&A"D R~~ S~ CHROME TBG & NR~*ON DIAGRAM. *"*4-1(2" 2214~ --' 5-1/2" NES X NfP, ID = 4.562" 2642' 9-5/8" DV PKR GAS I IFT MANDRELS S7 MD ND DEV lYPE VLV LATGN PORT DATE 6 3010 3010 7 CA-LB DOME RM 16 01/28/07 5 52$1 4973 41 CA-~B DOME RM 16 01/28(07 4 7153 6491 17 KBG2-LS SO INT 24 11/08/07 3 7915 7220 18 KBG2-LS DMY INT 0 05/19/06 2 8639 7912 18 KBG2-LS DNiY INT 0 08i27198 1 9188 8434 17 KBG2-LS DMY INT 0 05/19/06 ~' 6203' -~5-1/2" X 4-1/2" XO, ID = 3.875' 9-5/$" MILLQUT WINDQW (R-186} 6487' - 6532' \ \ 9297~ 4-1(2" HES X NIP, ID = 3.813" RECEIVED _ STATE OF ALASKA _ ALA" OIL AND GAS CONSERVATION COM~ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon 0 Repair Well 0 Performed: Alter Casing 0 Pull Tubing 0 Change Approved Program 0 Operat. Shutdown 0 2. Operator BP Exploration (Alaska), Inc. Name: 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 49.13 KB 8. Property Designation: ADL-028278 11. Present Well Condition Summary: Total Depth measured 13280 true vertical 8906.76 Effective Depth measured 13243 true vertical 8912.07 Casing Conductor Surface Production Liner Liner Length 80 2671 9742 3238 3927 Size 20" x 36" 13-3/8" 72# L-80 9-5/8" 47# L-80 7" 26# L-80 4-1/2" 12.6# 13Cr80 Perforation depth: Measured depth: 9550 - 9570 True Vertical depth: 8779.69 - 8798.29 Tubing: (size, grade, and measured depth) Packers and SSSV (type and measured depth) ~ 12. Stimulation or cement squeeze summary: Intervals treated (measured): JAN 0 9 2006 Stimulate 0 ~DthW,l~ G ,..' . W· 0 T· Ka .ut 86 bans. t;8R1fRISSIO alver Ime x enslon Re-enter Suspended Well [1nchorage 5. Permit to Drill Number: Exploratory D 198-1190 Service D 6. API Number: 50-029-20633-02-00 9. Well Name and Number: Plug Perforations [2] Perforate New Pool 0 Perforate 0 4. Current Well Class: Development M Stratigraphic D R-18B 10. Field/Pool(s): PRUDHOE BAY Field/ PRUDHOE OIL Pool feet feet Plugs (measured) Junk (measured) None None feet feet MD 30 - 110 29 - 2700 28 - 9770 6301 - 9539 9353 - 13280 TVD Burst Collapse 30 - 110 29 - 2699.89 4930 2670 28 - 8911.41 6870 4760 5737.53 - 8769.38 7240 5410 8591.82 - 8906.76 8430 7500 Slotted Liner 12171 - 13278 8948.76 - 8907.05 5-1/2" 17# 4-1/2" 12.6# 28 - 6203 6203 - 9362 13CR80 13CR80 9-5/8" DV Packer 7" Baker ZXP Top Packer 4-1/2" Baker S-3 Perm Packer 4-1/2" Baker ZXP Packer 2642 6301 9307 9361 I. cyqqf, .L .L c...uuL: RBDMS 8Ft ,IAN 1 () 2D06 . 'Ii ,{ k,~'\~¡f':;i¡·¡ ~\;;'I!~n\)~'l'JL., j Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl 252 243 x Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure 368 4223 0 351 4213 0 15. Well Class after proposed work: Exploratory Development M 16. Well Status after proposed work: Oil M Gas D WAG Tubing pressure 199 207 Service WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sharmaine Vestal Title Data Mgmt Engr Phone 564-4424 Date 1/6/2006 Form 10-404 Revised 04/2004 OR\G\NAL Submit Original Only . e e . R-18B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY I ACTIVITYDA TE I SUMMARY 11/23/2005 T/I/O=200/1780/680 Freeze Protect TBG & Flowline(slick-line to set TTP) ***Continue AWGRS on 11-24-05*** 11/24/2005 ***Continued AWGRS from 11-23-05*** Freeze Protect TBG & Flow Line (slick-line to set TTP) Pumped 3 bbls neet methanol spear & 55 bbls crude down TBG. Pumped 7 bbls neet methanol & 122 bbls crude down Flow line(woa procedure) Final WHP's=600/1780/680 11/27/2005 T/I/O=1200/1450/300 Load IA with 5 bbls meoh and 369 bbls crude FWH P= 1700/480/380 11/28/2005 **** WELL SHUT IN **** (set tbg tail plug / secure well) GAUGED TO & BRUSHED 4 1/2" "X" NIPPLE @ 9,331 MD, SET 4 1/2" "PX" PLUG @ 9,305' SLM (NOTE:EQULlZING SUB HAS (2) 1/4" HOLES & (2) 3/16 HOLES) EQULlZING PRONG IS 8' LONG W/ 2.75 CENTRALIZER 3" DOWN FRON 1.75" FISH NECK BLED TUBING FROM 1550 TO 1150 PSI GOOD 30 MIN TEST *** JOB IN ROGRESS CONTINUED ON WSR 11-29-05 *** 11/29/2005 *** CONTINUED FROM WSR 11-28-05 *** ( cmit t & ia ) C-MIT PASSED (SEE LRS WSR), PULLED "P" PRONG, LRS MIT OA, PASSED (SEE LRS WSR) PULLED "PX" PLUG BODY FROM 9304' SLM *** WELL LEFT SHUT-IN, NOTFY PAD OPERATOR READY TO POP *** FLUIDS PUMPED BBLS 1 I Diesel TOTAL 1 R-18B (PTD #1981190) Internal Waiver Cancellation ~, .. e . e ~1q \z\'Z1Ios Subject:R-188 (PTD #1981190) Internal Waiver Cancellation ... . From: "NSU, ADW Well Integrity Engìneer" <NSUADWWellIntegrityEngineer@8P.com> Date: Mon, 26 Dec 2005 05:5~:12 -0900 m. .. m ..... . To:'ìf\,Oó'Ce Wi!;1ton ·AUbert '(13- nî~il)" <wintQJ1c- aÚbert@ådIll¡W.statè;ak.lls> ,j'ÄOOO~·;'tiRv~eg~>' - ,., (E-Jîf:Ü)"<tji.mJ¿gg@admiri't~te.ak.u~<1L; .;. .... .."'<''*:,. ..,..: Winton and Jim, The internal BP waiver for TxlAxOA communication on well R-18B (PTD # 1981190) has been cancelled. Wells with confirmed TxlAxOA communication no longer meet waiver criteria. The well has been shut-in and reclassified as a Trouble well. Anchorage PE will evaluate remediation options. Please let me know if you have any questions. Rob Mielke Well Integrity Engineer, BP Exploration, (Alaska) Inc. Office: 1-907-659-5102 Pager: 1-907-659-5100 #1154 robert.mielke@bp.com { t, 't} ~,; 1 of 1 12/27/20059:27 AM RE: PBU R-18B ..."'" " e e I~~ Suh.icct: RE: PBU R-18B ?.t1(1 From: "NSU, !\DW Wclllntegrily Engineer" <NSUADWWcllIntcgrityEnginccr@ßP.eom> Hatc: Fri, 23 Dce 2005 19:25:38 -0900 To: "AOGCC Winton Aubcl1 (E-mail)" <winton_auhcrtCí:Dadmin.statc.ak.us>, "AOGCC Jim Rcgg (E-mail)..<:jilll_rcgg@adrnin.statc.ak.us>·. "NSU, ADW Well Integrity Engincer" <:NSUAD\VvVelllntegrityEnginecr@BP.com>, "Rossberg, R Stcven" <Steven.Rossberg@.BP.com>, "NSLJ, ADW Well Operations Supervisor" <NSUADWWcllOpcrationsSupcrvisor@BP.com> 1='ft) Iqß-ll1 Jim, The TxIAxOA communication waiver for well R-18B will be cancelled. We had intended to rewaiver the well for TxIA communication with a passing CMIT-TxIA on 11/29/05 indicating competent production casing. However, recent TIO pressure data and operator bleed records indicate that IAxOA communication still exists. With TxIAxOA communication the well is not a waiver candidate. We plan to cancel the existing waiver and reclassify well R-18B as a Trouble well. Please call me if you have any questions. Rob Mielke Well Integrity Engineer, BP Exploration, (Alaska) Inc. Office: 1-907-659-5102 Pager: 1-907-659-5100 #1154 E_c::>l.:2.~E!:.:_1!l.~..~~.!:s_~_cg).l2E.:r:::C::>.1!l -----original Message----- From: James Regg [!TI_a_~~!::S?_:j~1!l_~_':9g~<'i_c:i1!l~~:::;!:9:.!:§_:~!s_:~E3] Sent: Thursday, December 22, 2005 9:35 AM To: NSU, ADW Well Integrity Engineer Cc: Winton GAubert Subject: PBU R-18B Received inspector's SVS report for R-pad (tests witnessed 12/17/05); PBU R-18B (PTD 1981190) is listed as gas lift well with TxIAxOA communication; checked your waiver data and note that there is a waiver for TxIAxOA (1/6/2005). I understood from our 8/31/05 meeting ("Well Integrity Update") that BP was no longer granting waivers for wells with TxIAxOA communication "due to only one mechanical barrier". I also understood from the meeting gas lifted wells with IAxOA communication would be secured as trouble wells. Please clarify. Jim Regg AOGCC 1 of 1 12/27/20059:10 AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ Perforate_ FOOl Recover WRP Pull tubing _ Alter casing _ Repair well _ Other_X FCC 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__X RKB 49 feet 3. Address Explorato~__ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 3405' FNL, 3612' FEL, Sec. 32, T12N, R13E, UM (asp's 635292, 5978355) R-18B At top of productive interval 9. Permit number / approval number 1019' FNL, 2425' FEL, Sec. 32, T12N, R13E, UM (asp's 636429, 5980763) 198-119 At effective depth 10. APl number 4350' FNL, 4768' FEL, Sec. 28, T12N, R13E, UM (asp's 639323, 5982764) 50-029-20633-02 At total depth 11. Field / Pool 4328' FNL, 4739' FEL, Sec. 28, T12N, R13E, UM (asp's 639351, 5982787) Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 13280 feet Plugs(measured) RECEIVED true vertical 8907 feet Effective depth: measured 13243 feet Junk (measured) DEC 2, .l 2001 true vertical 8912 feet Al~a 0it & Gas Cons. C0mm~i0n Casing Length Size Cemented Measured Deptl~llchorsge True Vertical Depth Conductor 110' 20" 72 c.f. concrete 140' 140' Surface 2670' 13-3/8" 3720 c.f. Arcticset II 2700' 2700' Intermediate 6458' 9-5/8" 1335 c.f. G, 130 c.f. AS I 6488' 5881' Liner 3239' 7" 682 c.f. Class 'G' 6301'- 9540' 5737'- 8770' Sidetrack Liner 3927' 4-1/2" 353 c.f. Class 'G' 9353'- 13280' 8592'-8907' Perforation depth: measured Open Perfs 9550' - 9570', 11225' - 11250', 11300' - 11350', 11360' - 11385'. Slotted Liner 12171'- 13278'. true vertical Open Perfs 8780'- 8798', 8949'- 8946', 8941'- 8937', 8936'- 8935'. Slotted Liner 8949'- 8909'. Tubing (size, grade, and measured depth) 5-1/2" 17#, 13 Cr TBG to 6203' MD. 5-1/2" x 4-1/2" @ 6203'. 4-1/2" 13 Cr TBG Tail @ 9364'. Packers & SSSV (type & measured depth) 9-5/8" x 7" BKR ZXP PKR/HMC HGR @ 6301', 7" x 4-1/2" Baker S-3 PKR @ 9307'. 7" x 4-1/2" BKR ZXP PKR w/HMO LNR HNGR @ 9361', 4-1/2" HES 'X' NIP @ 2214' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Avera.qe Production or Iniection Data OiI-Bbl Gas-Mcf _ Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 10/16/2001 Well Shut-in Subsequent to operation 10/26/2001 1564 4331 2233 209 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __ Oil __ X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~~ ~.~_.,~:)~~J, Title: R Pad Petroleum Engineer Nov. 21,2001 Bry,=,, ,v,~L~,,~,, Prepared by DeWayne R. Schnorr 564-5174 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE ---.~ 10/17/2001 10/18/2001 10/19/2001 10/20/2001 10/21/2001 10/1 7/01 1 O/18/01 10/19/O 1 1 O/2O/O 1 R-18B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS FRACTURING.: SET GLV'S ( POST FRAC FCO ) IN PROGRESS FRACTURING.: SET GLV'S (PRE FCO) FRACTURING.: FCO/PULL WRP FRACTURING.: FCO/PULL WRP FRACTURING.: FCO/PULL WRP EVENT SUMMARY SET SS C-SUB @ 9250' SLM (NOTE: HAD TO WORK DOWN FROM 7136' SLM - SETTING DOWN EVERY 50' - 100' ) PULL 1" DGLV'S - INT FROM ST# 1 - 9172' & ST# 3 - 7901' SLM. PULLED 1-1/2" OGLV - T2 FROM ST# 5 @ 5270' SLM & 1-1/2" LGLV - T2 FROM ST# 6 @ 2998' SLM. SET 1-1/2" LGLV'S (RM LATCH'S) IN ST# 6 - 2999', ST# 5 - 5271', SET 1" LGLV (INT LATCH ) IN ST# 3 - 7903' SLM. SET 1" OGLV (INT LATCH ) IN ST# 1- 9172' SLM. PULL SS CS RDMO (WELL SHUT IN FOR FCO) MIRU #8. MU TS W/2.75" JS NOZZLE. PT APC AND COIL. OPEN WELL TO FLOW TO SYSTEM. WELL UNLOADING. RIH. TAG AND BREAKTHROUGH SAND @ 9567'. HARD TAG @ 9616.6'. JET 10 BBL FLOPRO SWEEP FOLLOWED BY CRUDE. CHASE TO 3RD GLM, PARK @ 7878'. WELL RETURNS DIED WHEN PUMPING STARTED. MONITOR RETURNS. RIH TO TAG @ 9616'. PUMP 20 BBL FLOPRO SWEEP, CHASE TO SURFACE W/CRUDE. MONITOR FLOW. RIH. TAG 9613'. PUMP 20 BBL FLOPRO, WASH TO 9616'. PUMP 20 BBL FLOPRO SWEEP. WASH OVER PLUG. CHASE TO SURFACE @ 80% W/CRUDE. MU WEATHERFORD WRP FISHING STRING. RIH. WASH A 20 AND 10 BBL FLOPRO SWEEP OVER PLUG. STACK WT TO EQUALIZE, PULLED 27K# UP. POH TO CHECK FOR FISH. 10/21/01 POH TO CHECK FOR FISH. ON SURFACE. WRP/FISH RECOVERED. MISSING SEALS: RECOVERED 1+ SEALS OF 3 TOTAL. MU VENTURI, RIH. PUMP VENTURI FROM 6000' TO 10082'. POH. VENTURI EMPTY. RDMO. ***LEFT WELL FLOWING*** FLUIDS PUMPED BBLS 1 PRESSURE TEST LUBRICATOR W/1 BBL OF DIESEL, (1 TESTS) 777 CRUDE 107 60/40 METHANOL WATER 15 2% KCL WITH EXTRA SLICK WATER 100 FLOPRO 1000 TOTAL Page 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations pedormed: Operation shutdown_ Stimulate _X Plugging _ Perforate _X ADPERFS & FRAC Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__X RKB 49 feet 3. Address Exploratow__ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1873' FSL, 1666' FWL, Sec. 32, T12N, R13E, UM (asp's 635292, 5978355) R-18B At top of productive interval 9. Permit number / approval number 1019' FNL, 2425' FEL, Sec. 32, T12N, R13E, UM (asp'sn/a) 198-119 At effective depth 10. APl number 1066' FNL, 2465' FEL, Sec. 32, T12N, R13E, UM (asp's 636389, 5980714) 50-029-20633-02 At total depth 11. Field / Pool 951' FSL, 540' FWL, Sec. 28, T12N, R13E, UM (asp's 639351, 5982787) Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Totaldepth: measured 13280 feet Plugs(measured) WRPOlSPset @ 961,-~-~[~r~ true vertical 8907 feet Effective depth: measured 9615 feet Junk (measured) Frac Sand on top of CIB~L 2. 7 2001 true vertical 8837 feet Alaska Oil & Gas Cons. Commission Casing Length Size Cemented Measured Depth '~(l~j~al Depth Conductor 11 O' 20" 72 c.f. concrete 140' 140' Surface 2670' 13-3/8" 3720 c.f. Arcticset II 2700' 2700' Intermediate 6458' 9-5/8" 1335 c.f. G, 130 c.f. AS I 6488' 5881' Liner 3239' 7" 682 c.f. Class 'G' 6301'- 9540' 5737' - 8770' Sidetrack Liner 3927' 4-1/2" 353 c.f. Class 'G' 9353' - 13280' 8592'- 8907' Perforation depth: measured Open Perfs 9550' - 9570', Open Perfs Below WRP Plug 11225' - 11250', 11300' - 11350', Open Perfs Below WRP Plug continued 11360'- 11385'. Slotted Liner 12171'- 13278'. true vertical Open Perfs 8780'- 8798', Open Perfs Below WRP Plug 8949'- 8946', 8941'- 8937', Open Perfs Below WRP Plug continued 8936' - 8935'. Slotted Liner 8949' - 8909'. iTubing (size, grade, and measured depth) 5-1/2" 17#, 13 Cr TBG to 6203' MD. 5-1/2" x 4-1/2" @ 6203'. 4-1/2" 13 Cr TBG Tail @ 9364'. Packers & SSSV (type & measured depth) 9-5/8" x 7" BKR ZXP PKR/HMC HGR @ 6301', 7" x 4-1/2" Baker S-3 PKR @ 9307'. 7" x 4-1/2" BKR ZXP PKR w/HMC LNR HNGR @ 9361', 4-1/2" HES 'X' NIP @ 2214' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __ Oil __ X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Prepared by DeWayne R. Schnorr 564-5174,~. Form 10-404 Rev 06/15/88 · ORIGINAL SUBMIT IN DUPLIC~'~ R-18B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS O2/22/2OOO 02/23/2000 03/06/2001 03/24/2001 04/11/2001 04/12/2001 04/16/2001 04/17/2001 04/17/2001 04/18/2001 04/19/2001 04/21/2001 04/23/2001 04/24/2001 04/25/2001 04/26/2001 06/20/2001 O2/22/OO O2/23/OO O3/O6/OO 03/24/01 04/11/01 CTE ADD PERFS CTE ADD PERFS FRACTURING.: DRIFT AND TAG W/2-7/8" DMY GUN (PRE FRAC) FRACTURING · ADPERF FRACTURING · MILL XN NIPPLE/SET WRP PLUG FRACTURING · FRACTURING · INSTALL DGLV'S/MITIA TO 3000 PSI--PASSED (PRE-FRAC) FRACTURING.' SAG FRAC FRACTURING.' TAG BRIDGE PLUG FRACTURING.' SAG FRACTURE TREATMENT FRACTURING.' DRIFT & TAG, GLV/CO FRACTURING.' FREEZE PROTECT TBG FRACTURING.' CO FRAC SAND...PULL WRP (POST SAG FRAC) FRACTURING.: CO FRAC SAND...PULL WRP FRACTURING.: CLEAN FRAC SAND FROM WELL AND PULL PLUG FRACTURING.: CLEAN FRAC SAND FROM TUBING AND PULL PLUG SBHP/FBHP SURVEY: SBHPS W/PETRADAT EVENT SUMMARY MIRU CTE UNIT #1. RIH AND PERFORATE 11360' - 11385' AND 11325' - 11350' IN TWO RUNS WITH 2-7/8", 34J, HMX, 4 SPF 60/120 PHASE GUNS WITH WELL FLOWING. POH. SDFN. RU CTE UNIT #1. RIH AND PERFORATE 11300'-11325'. POOH. RIH AND PERFORATE 11225'- 11250' (2-7/8", 34J, HMX, 4 SPF, 60/120 PHASE GUNS BOTH PERF RUNS). POH. RD CTE UNIT #1. REQUESTED PRODUCTION CONTROL PUT WELL IN TEST. DRIFT W/10' 2-7/8 DUMMY GUN TO 9715' WLMD. TOOLS STOPPED DUE TO DEV. RDMO. WELL LEFT SHUT IN. PERFORATED 9550' - 9570' WITH 2-7/8" P J, 6 SPF. SHOT DEPTH 9544.5 (5.5' CCL TO TOP SHOT). - ..... WELL ON PRODUCTION ....... RIH WITH 3.80 CARBIDE MILL AND STRING MILL; TAG XN NIPPLE AT 9340.2'; FLAG PIPE; MILL XN NIPPLE, BACK REAM THROUGH. DRIFT THROUGH NIPPLE DRY. PUMP 15 BBL BIO SWEEP. POOH AT 80%. OOH LOST BTM MILL. GATHER FISHING STRING. COMPLETE WEEKLY BOPE TEST. RIH W/BHA. CORRECT AND RE- FLAG FOR ADDITIONAL LUB. SET 5K DOWN ON BTM @ 13266'. POH. LAY DOWN FISHING STRING...RECOVERED FISH (MILL). RUN IN HOLE WITH RUNNING TOOLS AND WEATHERFORD WRP (ClBP). POSITION PLUG AT 9,615- FT. Page 1 04/12/01 04/16/01 O4/17/01 04/17/O 1 04/18/01 04/19/01 04/21/01 04/23/01 04/24/01 CONTINUE WSR...DROP BALL AND DISPLACE WITH DEAD CRUDE. PLUG SET AT 9615-FT CTD. (TOP OF FISH NECK 9613-FT). PULL OUT OF HOLE WHILE DISPLACING WELL BORE WITH DEAD CRUDE. LAY DOWN TOOLS. RIG DOWN UNIT. POP. PULLED STAff 1 INT-FLOW SLEEVE. PULLED STA# 3 INT-LGLV; STA# 5 & 6 RA- LGLV'S. SET STA# 5 & 6 T2-DGLV'S. SET STA# 3 INT-DGLV. LOAD IA W/CRUDE. SET STA# 1 INT-DGLV. MITIA TO 3000 PSI--PASSED. PULLED 4 1/2" XN C-SUB. RDMO. WELL LEFT SHUT-IN FOR FRAC. PUMPED BREAKDOWN, 1 PPG SCOUR AND DATA FRAC. POSTPONED SAND FRAC DUE TO TREESAVER PROBLEMS. CALL OUT SLICKLINE TO DRIFT TBG AND TAG WRP PLUG. REBUILD TREESAVER. WELL FREEZE PROTECTED TO 2000' WITH DIESEL. R.I.H. W/2.50 SWAGE &1.75 SB TAG @ 9586 (SLM) P.O.O.H. SB HAD FRAC SAND IN IT. NOTIFIED DSO WELL SHUT IN. SAG FRACTURE TREATMENT. PUMP 1 PPA SCOUR AND DATA FRAC. RE-CALC PAD VOL. PUMP MAIN FRAC TREATMENT @ 40 BPM, AVE WHP=3300 PSI, YF140D FLUID. FLUSH TO PERFS. PUT 126,884# 20/40 C-LITE BEHIND PIPE. LEFT 774# IN PIPE. PULLED TREESAVER WITH CUPS INTACT. PUMPED 3 BBLS DIESEL THROUGH WH @ MIN RT FOR FP. DRIFT W/2.70" CENT. & SMP. BLR. TO 9287' SLM., NO SMP., SET S.S.C.SUB @ 5375' SLM., PULLED STA.# 6, & 5 DGLV WFF-2 LATCHES, SET GENERIC'S VALVES W/RM LATCHES, BACK IN PLACE OF DMY GLV'S. PULLED S.S.C. SUB. RDMO TTS. LEFT WELL SHUT IN, FLUID ON BACK SIDE. POST FRAC. FREEZE PROTECT TBG. MOVE TO LOCATION. WAIT ON THIRD PARTY EQUIPMENT AND FLOW BACK SEPARATOR TO BE RIGGED UP. RIG UP DS CTU #3. START GAS-LIFT AND PRODUCE WELL THRU APC SEP. RIH AND TAG TOP OF CARBOLITE AT 9299' CTM. JET WASH TO 9609' CTM AND TAG WRP PLUG. WASH FISH NECK. POOH. RIH W/OVERSHOT FISHING TOOLS. TAG SAND TOP AT 9472' !!! POOH TO SWAP TO NOZZLE AGAIN. CONTINUE ON WITH FCO THRU APC SEPARATOR USING GAS LIFT TO ASSIST CLEAN OUT. WASHED CARBOLITE DOWN TO WRP AT 9,609-FT CTD. PUMPED BIOZAN SWEEP AND CHASED UP TO GLM AT 5,271-FT. PARK NOZZLE. RETURNED TO WRP AT 9,609-FT CTD. PUMPED FINAL BIOZAN SWEEP. CHASE SWEEP TO SURFACE. LAY DOWN NOZZLE. PICK-UP WEATHERFORD BHA. RUN BACK IN HOLE. TAG FILL AT 9540' CTM. POOH. RBIH W/NOZZLE AND JET TO WRP AT 9613' CTM W/NO LIFT-GAS. JET OVER 80 BBLS 2# BIO DIRECTLY ON FISH-NECK AT 2.5-3.0 BPM. POH @ 80%. APPROX 40% LOSSES TO FORMATION. RIH W/OVERSHOT ASS'Y. TAGGED TOP OF CARBOLITE AT 9,524- FT CTD. FORMATION CONTINUES TO PRODUCE CARBOLITE BEHIND FILL CLEAN OUTS. SAG PERFS (9,550'- 9,570') REMAIN COVERED. Page 2 04/25/01 04/26/01 MIRU FOR BOP TEST, SERVICE TREE AND TEST BOP'S FINISH BOP TEST, RUN IN TAG TOP OF SAND AT 9548, CLEAN OUT TO PLUG AT 9604' - PUMP BIOZAN SWEEPS - SAND TO SURFACE, PUMP FLOPRO SLUGS TO REDUCE LOSSES TO 25%, LOSSES INCREASED TO 50% WHEN FLOPRO WAS LOST TO FORMATION, POOH TO RUN FISHING TOOL; MU WEATHERFORD WRP PULLING TOOL; RIH SIT DOWN AT 9545'; 60' ABOVE PLUG; POOH FREEZE PROTECT TO 2000 WITH 60/40; RIG DOWN. 06/20/01 RAN TBG END LOCATER, AND PETREDAT GAUGES (TANDEM) FOR STATIC SURVEY. AVG. PRESS. @ 8600' TVD = 2328 PSI. AVG TEMP = 190 DEG F. NOTE: PRESSURE WAS FALLING OFF 14.5 PSI DURING THE SURVEY. LEFT WELL SHUT IN NOTIFY DSO OF WELL CONDITIONS. FLUIDS PUMPED 2 PRESSURE TEST LUBRICATOR W/DIESEL (2 TEST). 143 DIESEL 58O CRUDE 419 SEAWATER 3645 2% SLICK KCL WATER 975 1% KCL WATER (DOUBLE SLICK) 608 1% KCL WATER (EXTRA SLICK) 1389 GEL WATER 378 60/40 METHANOL WATER 192 METHANOL 5 NEAT METHANOL 125 BIOZAN 230 BIOZAN (1.5#) 260 BIOZAN (2.0#) 5O FLOPRO 9001 TOTAL Page 3 ADD-PERFS ADD PERFS SUMMARY 02/23/2000 THE FOLLOWING INTERVALS WERE PERFORATED USING 2-7/8" HSD 34J, HMX CHARGES, 4 SPF, 60/120 DEGREE PHASING, RANDOM ORIENTATION. 11225'-11250' MD 11300'-11325' MD 11325'-11350' MD 11360'-11385' MD 03/24/2001 THE FOLLOWING INTERVAL WAS PERFORATED USING 2-7/8" HSD 34J, HMX CHARGES, 6 SPF, 60/120 DEGREE PHASING, RANDOM ORIENTATION. 9550'-9570' Page 4 .. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: FROM: Dan Seamount Chairman Blair Wondzell P.I. Supervisor John Spauldin~' Petroleum Inspector DATE: AuguSt 16, 2000 SUBJECT: Mechanical Integrity TeSts BPX : MPI 2-34/P-14, 2-06/J-22 DIU Endicott NON- CONFIDENTIAL Packer Depth Pretest Initial 15 Min, 30 Min. P.T.D. Notes: P.T.D.I Notes: Notes: Notes: Notes: 2-06/J-22 187-018 2-34/P-14 198-119 180-120 I TYP 'ni'I S'I I Tub,n l 4200 i, 00 1,200 1,200 l,nterva,I VI I Type testI O I Testpsil 2339 I CasingI 750 I 2550 I 2550 I 2550 I P/F I PI I Type lnj.I S I T.V.D: I e119 '1 Tubing l 1950 11950 I ~0 I ~0I,nte~va,l'V J ~TypetestI P I TestpsiI 2000I 2600I 2~00I 2550I P/F I J ~280 I CasingI P Typetest Type INJ. Fluid Codes F = FRESH WATER IN J, G = GAS INJ. S = SALT WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitodng P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Interval I= Initial Test 4= Four Year Cycle V= Required by Vadance W= Test during Workover O= Other (describe in notes) Test's Details Testing went quite well, all wells were found to be in compliance. The lack of activity over the last 18 months has definetly had an impact on the "shine" that this field has had in the past. Type the test details in here. Expand or cotract the row height as needed. The sheet is protected so you will need to unprotect first, there is no password. .I.T.'s performed: 2_ Attachments: Number of Failures: O Total Time during tests: 5__ cc: MIT report form 5/12100 L.G. mit diu mpi 8-16-00js.xls 9/7/00 Well Compliance Report File on Left side of folder .. 198-119-0 MD 13280/' Microfilm Roll PRUDHOE BAY UNIT R-18B 50- 029-20633-02 BP EXPLORATION (ALASK ~~8/23 A \ l~.lt~ TVD 08907/ Completion Date: /98 Completed Status: 1-OIL Current: / Roll 2 / -- Name Interval L EXSVSET t~F~NAL 6500-6700 L IMP-GR/RES~MD &FINAL 6500-13250 Sent Received T/C/I) OH 1/27/99 2/4~99 L IMP-GR/RES-TVD L-FINAL 5900-8950 OH 1/27/99 2/4/99 R SRVY RPT ~M 6400.18-13279.97 OH 9/29/98 9/29/98 T 8973 F~"~LUM IMP OH 1/27/99 2/4/99 Daily Well Ops ~/~J-/~ - Are Dry Ditch Samples Required? yes (~_.~nd Received~b~ye~ Was the well cored? yes ~ Analysis Description Rec~~no Sampl~$e'fg Comments: Tuesday, August 01, 2000 Page 1 of 1 1/27/99 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATEN: Sherrie NO. 12280 Company Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Well Job If Log Description Date BL Sepia Tape R-18B ~ ~ 98624 IMPULSE 980813 1 R-188 98624 IMPULSE/GR/RES 980813 1 i R-18B 98624 IMPULSE/GR/RES TVD 980813 1 i R-40 P81 ~ ~c~,~-- 99027 IMPULSE 981107 1 R-40 PB1 99027 IMPULSE/GE/RES 981107 1 1 X-03A ~ ~l 99019 IMPULSE 980530 1 X-03A 99019. IMPULSE/GR/RES 980530 1 1 X-03A 99019 IMP/GR/RES/BOREHOLE PROF 980530 1 1 X-O3A 99019 IMPULSE/GR/RES TVD 980530 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center M83-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: I999 Ala$1~a ()il & Gas Cons. Commission Schlumberger GeoQuest 3940 Arctic BIvd Received 'bye---" ~~ KtL.hlVbl .~__ STATE OF ALASKA SE? 29 t998 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND b~,~a0il&GasCons.~B~ Anchorage 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 98-119 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20633-02 · ,~"~ 4. Location ofwell at surface {¢'?_"-"-,, i '~'""'~q' ¢¢;?'~ ' -~; 9. Unit or Lease Name 3405' SNL, 3613' WEL, SEC. 32, T12N, R13E, UM ~ ¢:,~: ~: ~ .1 Prudhoe Bay Unit At top of productive interval ~z/~/-~_.~.,,~_~i~i._ ~ 10. Well Number 1019' SNL, 2425' WEL, SEC. 32, T12N, R13E, UM At total depth ? 11. Field and Pool 953' NSL, 526' EWL, SEC. 28, T12N, R13E, UM Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = 49.13'I ADL 028278 12. Date Spudded7/30/98 113' Date I'D' Reached I 14' Date C°mp" Susp" °r Aband'll 5' Water depth' if °fish°re I16' N°' °f C°mpleti°nsG/13/98 8/23/98 , N/A MSL One 17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 13280 8907 FTI 13280 8907 FTI []Yes I~No (Nipple) 2214' MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, DIR, GR, RES, FE, DD 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" Insulated Conductor Surface 110' 36" 8 cu yds concrete 13-3/8" 68# NT80CYHE Surface 2700' 17-1/2" 3720 cu ft Arcticset II 9-5/8" 47# NT80 Surface 6488' 12-1/4" 1335 cu ft Class 'G', 130 cu ft Arcticset I 7" 26# L-80 6301' 9540' 8-1/2" 682 cu ft Class 'G' 4-1/2" 12.6# 13Cr80 9353' 13280' 6" 353 cu ft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Liner 5-1/2", 17#, 13Cr80 6204' MD TVD MD TVD 4-1/2% 12.6#, 13Cr80 6204' - 9366' 9307' 12171' - 13278' 8949' - 8907' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 135 Bbls of Diesel 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) September 2, 1998I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-EEL GAS-MCF WATER-EEL CHOKE SIZE IGAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-EEL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate .~29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 9526' 8757' Shublik 'A' 9575' 8803' i Shublik 'B' 9626' 8845' Shublik 'C' 9665' 8871' Top of Sadlerochit / Z4 9701' 8889' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ,~------~.~__-¢~,o. ~ Dan Stone Title Engineering Supervisor Date ~t / &L~ i ~ R-18B 98-119 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21-' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 2?'- Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28-' If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Progress Report Facility PB R Pad Well R-18B Rig Nabors 2ES Page 1 Date 27 August 98 Date/Time 25 Jul 98 26 Jul 98 27 Jul 98 28 Jul 98 01:00-04:00 04:00-04:30 04:30-05:00 05:00-06:00 06:00-09:00 09:00-12:00 12:00-12:30 12:30-13:30 13:30-16:30 16:30-18:00 18:00-18:30 18:30-23:00 23:00-00:00 00:00-00:30 00:30-02:00 02:00-02:30 02:30-04:00 04:00-06:00 06:00-07:00 07:00-09:00 09:00-10:30 10:30-12:00 12:00-12:30 12:30-14:30 14:30-16:00 16:00-18:30 18:30-21:00 21:00-22:30 22:30-23:30 23:30-00:00 00:00-00:30 00:30-02:00 02:00-02:30 02:30-06:00 06:00-07:00 07:00-11:30 11:30-12:00 12:00-12:30 12:30-13:30 13:30-15:00 15:00-17:00 17:00-17:30 17:30-18:30 18:30-19:30 19:30-22:00 22:00-00:00 00:00-00:30 00:30-04:30 04:30-06:00 06:00-07:30 07:30-09:30 09:30-10:00 10:00-12:00 12:00-12:30 Duration 3 hr 1/2 hr 1/2 hr 1 hr 3 hr 3 hr 1/2 hr 1 hr 3 hr 1-1/2 hr 1/2hr 4-1/2 hr 1 hr 1/2 hr 1-1/2 hr 1/2 hr 1-1/2 hr 2hr lhr 2 hr 1~1/2 hr 1-1/2 hr 1/2 hr 2 hr 1-1/2 hr 2-1/2 hr 2-1/2 hr 1-1/2 hr 1 hr 1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 3-1/2 hr 1 hr 4-1/2 hr 1/2 hr 1/2 hr 1 hr 1-1/2 hr 2 hr 1/2 hr 1 hr 1 hr 2-1/2 hr 2hr 1/2 hr 4 hr 1-1/2 hr 1-1/2 hr 2 hr 1/2 hr 2 hr 1/2 hr Activity Fill pits with Seawater Removed Accessories Rigged up High pressure lines Bleed down well Circulated at 7000.0 ft Flow check Held safety meeting Installed Accessories Removed Surface tree Installed BOP stack Installed High pressure lines Tested BOP stack Retrieved Accessories Held safety meeting Removed Tubing hanger Circulated at 7000.0 ft Removed Tubing hanger Set Retrievable packer at 40.0 ft with 0.0 psi Set Retrievable packer at 50.0 ft with 0.0 psi Removed Seal assembly Rigged down BOP stack Removed Seal assembly Held safety meeting Removed Seal assembly Rigged up BOP stack Installed Tubing head spool Installed Seal assembly Rigged up BOP stack Tested BOP stack Retrieved Tubing landing string Held safety meeting Circulated at 7000.0 ft Retrieved Tubing landing string Laid down 2000.0 ft of Tubing Retrieved SCSSSV Laid down 4600.0 ft of Tubing Rigged up Logging/braided cable equipment Held safety meeting Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Made up BHA no. 1 Tested Permanent packer Made up BHA no. 1 Singled in drill pipe to 3000.0 ft Serviced Swivel Held safety meeting Serviced Kelly Singled in drill pipe to 4200.0 ft Singled in drill pipe to 6632.0 ft (cont...) Circulated at 6632.0 ft Laid down 150.0 ft of 5in OD drill pipe Milled Casing at 6488.0 ft Held safety meeting Progress Report Facility PB R Pad Well R- 18B Rig Nabors 2ES Page 2 Date 27 August 98 Date/Time 12:30-20:00 20:00-21:30 21:30-23:00 23:00-00:00 29 Jul 98 00:00-00:30 00:30-01:00 01:00-04:00 04:00-05:00 05:00-06:00 06:00-06:30 06:30-06:45 06:45-07:30 07:30-08:00 08:00-08:30 08:30-10:30 10:30-12:00 12:00-12:30 12:30-14:00 14:00-14:30 14:30-15:00 15:00-15:30 15:30-17:30 17:30-17:45 17:45-18:00 18:00-20:30 20:30-22:30 22:30-23:30 23:30-00:00 30 Jul 98 00:00-00:30 00:30-01:00 01:00-02:30 02:30-06:00 06:00-06:30 06:30-10:00 10:00-10:30 10:30-12:00 12:00-12:30 12:30-13:00 13:00-00:00 31 Jul 98 00:00-00:30 00:30-01:00 01:00-06:00 06:00-07:00 07:00-20:00 20:00-21:00 21:00-21:30 21:30-22:00 22:00-06:00 01 Aug 98 06:00-08:00 08:00-08:15 08:15-12:00 12:00-12:30 12:30-18:00 18:00-19:00 Duration 7-1/2 hr 1-1/2 hr 1-1/2 hr lhr 1/2 hr 1/2 hr 3 hr 1 hr 1 hr 1/2 hr 1/4 hr 3/4 hr 1/2 hr 1/2 hr 2 hr 1-1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 1/2 hr 2 hr 1/4 hr 1/4 hr 2-1/2 hr 2 hr 1 hr 1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 3-1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 1/2 hr llhr 1/2 hr 1/2 hr 5 hr 1 hr 13hr lhr 1/2 hr 1/2 hr 8 hr 2 hr 1/4 hr 3-3/4 hr 1/2 hr 5-1/2 hr lhr Activity Milled Casing at 6488.0 ft Circulated at 6533.0 ft Pulled out of hole to 685.0 ft Pulled BHA Held safety meeting Pulled BHA R.I.H. to 6475.0 ft Washed to 6632.0 ft Circulated at 6632.0 ft Circulated at 6632.0 ft (cont...) Held safety meeting Mixed and pumped slurry - 29.000 bbl Pulled out of hole to 5500.0 ft Circulated at 5500.0 ft Held 2000.0 psi pressure on 2.000 bbl squeezed cement Laid down 1350.0 ft of 5in OD drill pipe Held safety meeting Pulled out of hole to 0.0 ft Washed to 0.0 ft Retrieved Wear bushing Installed BOP test plug assembly Tested BOP stack Retrieved BOP test plug assembly Installed Wear bushing Made up BHA no. 3 R.I.H. to 6100.0 ft Serviced Block line Rigged up Computer hardware Held safety meeting R.I.H. to 6349.0 ft Drilled cement to 6405.0 ft Wait on cement Drilled cement to 6405.0 ft Wait on cement Drilled cement to 6445.0 ft Wait on cement Held safety meeting Drilled cement to 6492.0 ft Drilled cement to 6538.0 ft Held safety meeting Drilled to 6583.0 ft Circulated at 6583.0 ft Circulated at 6583.0 ft (cont...) Drilled to 7493.0 ft Circulated at 7493.0 ft Pulled out of hole to 6450.0 ft R.I.H. to 7493.0 ft Drilled to 7960.0 ft Drilled to 8000.0 ft (cont...) Held drill (Kick while drilling) Drilled to 8221.0 ft Held safety meeting Drilled to 8509.0 ft Circulated at 8509.0 ft Progress Report Facility PB R Pad Well R-18B Rig Nabors 2ES Page 3 Date 27 August 98 Date/Time 19:00-20:00 20:00-20:30 20:30-00:00 02 Aug 98 00:00-00:15 00:15-06:00 06:00-12:00 12:00-12:15 12:15-12:30 12:30-20:30 20:30-22:00 22:00-23:30 23:30-00:00 03 Aug 98 00:00-00:15 00:15-01:30 01:30-03:30 03:30-06:00 06:00-07:30 07:30-09:30 09:30-10:00 10:00-12:00 12:00-12:30 12:30-15:30 15:30-16:00 16:00-16:30 16:30-18:00 18:00-19:00 19:00-20:00 20:00-22:30 22:30-00:30 04 Aug 98 00:30-01:00 01:00-02:30 02:30-04:00 04:00-04:30 04:30-06:00 06:00-07:30 07:30-07:45 07:45-08:00 08:00-11:00 11:00-11:15 11:15-11:30 11:30-12:00 12:00-12:30 12:30-13:00 13:00-15:30 15:30-18:00 18:00-19:00 19:00-20:00 20:00-00:00 05 Aug 98 00:00-00:30 00:30-02:00 02:00-03:00 03:00-05:00 05:00-06:00 06:00-06:30 Duration 1 hr 1/2 hr 3-1/2 hr 1/4 hr 5-3/4 hr 6 hr 1/4 hr 1/4 hr 8 hr 1-1/2 hr 1-1/2 hr 1/2 hr 1/4 hr 1-1/4 hr 2 hr 2-1/2 hr 1-1/2 hr 2 hr 1/2 hr 2 hr 1/2 hr 3hr 1/2 hr 1/2 hr 1-1/2 hr 1 hr 1 hr 2-1/2 hr 2 hr 1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr 1-1/2 hr 1-1/2 hr 1/4 hr 1/4 hr 3hr 1/4 hr 1/4 hr 1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 2-1/2 hr 1 hr 1 hr 4 hr 1/2 hr 1-1/2 hr lhr 2hr 1 hr 1/2 hr Activity Pulled out of hole to 8410.0 ft R.I.H. to 8509.0 ft Drilled to 8699.0 ft Held safety meeting Drilled to 8940.0 ft Drilled to 9194.0 ft (cont...) Held safety meeting Held drill (Kick while drilling) Drilled to 9540.0 ft Circulated at 9540.0 ft Pulled out of hole to 6480.0 ft R.I.H. to 9540.0 ft Held safety meeting Reamed to 9540.0 ft Circulated at 9540.0 ft Pulled out of hole to 3500.0 ft Pulled out of hole to 1000.0 ft (cont...) Pulled BHA Rigged up Casing stabbing board Ran Liner to 1500.0 ft (7in OD) Held safety meeting Ran Liner to 3200.0 ft (7in OD) Installed Liner hanger Circulated at 3300.0 ft Ran Liner on landing string to 6400.0 ft Rigged up High pressure lines Ran Liner on landing string to 9540.0 ft Circulated at 9540.0 ft Mixed and pumped slurry - 120.000 bbl Set Liner hanger at 6300.0 ft with 4500.0 psi Circulated at 6300.0 ft Pulled Drillpipe in stands to 3100.0 ft Serviced Block line Laid down Drillpipe of 3100.0 ft Laid down 3100.0 ft of Drillpipe (cont...) Retrieved Wear bushing Installed BOP test plug assembly Tested Well control Retrieved BOP test plug assembly Installed Wear bushing Made up BHA no. 4 Held safety meeting Made up BHA no. 4 Singled in drill pipe to 3900.0 ft R.I.H. to 9352.0 ft Tested Liner Held drill (Stripping) Drilled cement to 9455.0 ft Held safety meeting Drilled cement to 9540.0 ft Drilled to 9560.0 ft Circulated at 9560.0 ft Laid down 2700.0 ft of 5in OD drill pipe Laid down 2700.0 ft of 5in OD drill pipe (cont...) Progress Report Facility PB R Pad Well R-18B Page 4 Rig Nabors 2ES Date 27 August 98 Date/Time 06:30-09:30 09:30-11:00 11:00-12:00 12:00-12:30 12:30-16:30 16:30-00:00 06 Aug 98 00:00-01:30 01:30-05:00 05:00-06:00 06:00-07:00 07:00-10:00 10:00-11:00 11:00-11:30 11:30-06:00 07 Aug 98 06:00-06:00 08 Aug 98 06:00-17:30 17:30-19:00 19:00-20:30 20:30-21:00 21:00-00:00 09 Aug 98 00:00-03:30 03:30-05:30 05:30-06:00 06:00-06:30 06:30-08:30 08:30-11:00 11:00-11:30 11:30-12:30 12:30-14:00 14:00-15:00 15:00-20:30 20:30-22:00 22:00-22:30 22:30-02:00 10 Aug 98 02:00-02:30 02:30-06:00 06:00-07:30 07:30-03:00 11 Aug 98 03:00-04:00 04:00-06:00 06:00-09:00 09:00-10:30 10:30-14:00 14:00-15:00 15:00-16:00 16:00-16:30 16:30-19:30 19:30-20:30 20:30-21:30 21:30-23:30 23:30-06:00 12 Aug 98 06:00-06:00 13 Aug 98 06:00-22:00 22:00-01:30 Duration 3 hr 1-1/2 hr 1 hr 1/2 hr 4 hr 7-1/2 hr 1-1/2 hr 3-1/2 hr 1 hr 1 hr 3 hr lhr 1/2 hr 18-1/2 hr 24 hr 11-1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr 3 hr 3-1/2 hr 2 hr 1/2 hr 1/2 hr 2 hr 2-1/2 hr 1/2 hr lhr 1-1/2 hr 1 hr 5-1/2 hr 1-1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 3-1/2 hr 1-1/2 hr 19-1/2 hr lhr 2 hr 3hr 1-1/2 hr 3-1/2 hr 1 hr 1 hr 1/2 hr 3 hr lhr 1 hr 2hr 6-1/2 hr 24 hr 16hr 3-1/2 hr Activity Pulled out of hole to 300.0 ft Pulled BHA Made up BHA no. 5 Held safety meeting R.I.H. to 9531.0 ft Drilled to 9720.0 ft Circulated at 9720.0 ft Pulled out of hole to 500.0 ft Pulled BHA Made up BHA no. 6 R.I.H. to 9530.0 ft Serviced Block line R.I.H. to 9700.0 ft Drilled to 10580.0 ft Drilled to 11450.0 ft Drilled to 11777.0 ft Circulated at 11777.0 ft Pulled out of hole to 9540.0 ft Logged hole with LWD: DIR/DD from 9530.0 ft to 9580.0 ft Pulled out of hole to 6885.0 ft Logged hole with LWD: DIR/DD from 6250.0 ft to 6500.0 ft Pulled out of hole to 195.0 ft Pulled BHA Pulled BHA Made up BHA no. 7 R.I.H. to 6300.0 ft Serviced Block line R.I.H. to 11750.0 fi Drilled to 11840.0 ft Circulated at 11840.0 ft Pulled out of hole to 860.0 ft Pulled BHA Rigged up BOP test plug assembly Tested BOP stack Rigged up Wear bushing R.I.H. to 9560.0 ft Logged hole with LWD: DIR/DD from 11775.0 ft to 11840.0 ft Drilled to 12405.0 ft Laid down 341.0 ft of 5in OD drill pipe Drilled to 12010.0 ft Drilled to 12010.0 ft Pulled out of hole to 450.0 ft Pulled out of hole to 450.0 ft Pulled BHA Made up BHA no. 9 R.I.H. to 305.0 ft R.I.H. to 9500.0 ft Serviced Block line R.I.H. to 12020.0 ft Logged hole with LWD: DIR/FE/DD from 12250.0 ft to 12405.0 ft Drilled to 12465.0 fi Drilled to 12925.0 ft Drilled to 13280.0 fi Circulated at 13280.0 ft Progress Report Facility PB R Pad Well R- 18B Rig Nabors 2ES Page 5 Date 27 August 98 Date/Time 14 Aug 98 15 Aug 98 16 Aug 98 17 Aug 98 01:30-04:00 04:00-06:00 06:00-07:30 07:30-10:00 10:00-11:00 11:00-12:30 12:30-13:00 13:00-19:30 19:30-20:00 20:00-20:30 20:30-23:30 23:30-00:00 00:00-02:00 02:00-06:00 06:00-07:00 07:00-08:30 08:30-10:00 10:00-11:00 11:00-12:00 12:00-13:00 13:00-15:30 15:30-16:00 16:00-18:00 18:00-19:00 19:00-00:00 00:00-00:30 00:30-01:00 01:00-03:00 03:00-04:00 04:00-06:00 06:00-07:00 07:00-10:30 10:30-11:00 11:00-15:00 15:00-16:00 16:00-18:00 18:00-18:30 18:30-03:00 03:00-06:00 06:00-06:30 06:30-06:45 06:45-07:00 07:00-08:30 08:30-09:30 09:30-11:30 11:30-11:45 11:45-12:00 12:00-12:30 12:30-13:00 13:00-14:30 14:30-17:00 17:00-17:30 17:30-20:00 20:00-22:00 Duration 2-1/2 hr 2 hr 1-1/2 hr 2-1/2 hr lhr 1-1/2 hr 1/2 hr 6-1/2 hr 1/2 hr 1/2 hr 3 hr 1/2 hr 2 hr 4hr 1 hr 1-1/2 hr 1-1/2 hr lhr 1 hr 1 hr 2-1/2 hr 1/2 hr 2hr 1 hr 5hr 1/2 hr 1/2 hr 2 hr 1 hr 2 hr 1 hr 3-1/2 hr 1/2 hr 4 hr 1 hr 2hr 1/2 hr 8-1/2 hr 3 hr 1/2 hr 114 hr 1/4 hr 1-1/2 hr 1 hr 2 hr 1/4 hr 1/4 hr 1/2 hr 1/2 hr 1-1/2 hr 2-1/2 hr 1/2 hr 2-1/2 hr 2 hr Activity Pulled out of hole to 9500.0 ft Pulled out of hole to 7500.0 ft Pulled out of hole to 4500.0 ft Laid down 3162.0 ft of 3-1/2in OD drill pipe Pulled BHA Installed Casing handling equipment Held safety meeting Ran Liner to 3900.0 ft (4-1/2in OD) Rigged down Casing handling equipment Circulated at 3900.0 ft Ran Liner in stands to 9500.0 ft Circulated at 9500.0 ft Ran Liner in stands to 13280.0 ft Circulated at 12171.0 ft Functioned Inflatable packer Circulated at 12129.0 ft Mixed and pumped slurry - 63.000 bbl Circulated at 9368.0 ft Pulled Drillpipe in stands to 9353.0 ft Serviced Block line Pulled Drillpipe in stands to 9200.0 ft Repaired Tubing handling equipment Pulled Drillpipe in stands to 9300.0 ft Rigged up Drillstring handling equipment Made up BHA no. 10 Circulated at 3621.0 ft Rigged up Drillstring handling equipment Pulled out of hole to 0.0 ft Investigated pressure change R.I.H. to 90.0 ft Pulled out of hole to 0.0 ft R.I.H. to 3950.0 ft Rigged down Drillstring handling equipment R.I.H. to 9380.0 ft Drilled cement to 9435.0 ft R.I.H. to 9691.0 ft Tested Casing - Via annulus Pulled out of hole to 0.0 ft Pulled BHA Pulled BHA (cont...) Retrieved Wear bushing Installed BOP test plug assembly Tested Choke manifold Repaired Well control Tested BOP stack Retrieved BOP test plug assembly Installed Wear bushing Held safety meeting Rigged up Drillstring handling equipment Made up BHA no. 11 R.I.H. to 4000.0 ft Circulated at 4000.0 ft Pulled out of hole to 300.0 ft Pulled BHA Progress Report Facility PB R Pad Well R- 18B Rig Nabors 2ES Page 6 Date 27 August 98 Date/Time 18 Aug 98 19 Aug 98 20 Aug 98 21 Aug 98 22:00-00:00 00:00-00:30 00:30-03:00 03:00-06:00 06:00-07:00 07:00-08:00 08:00-09:00 09:00-09:30 09:30-12:00 12:00-12:30 12:30-13:00 13:00-18:00 18:00-20:00 20:00-21:30 21:30-22:30 22:30-00:00 00:00-00:30 00:30-02:00 02:00-03:00 03:00-04:00 04:00-04:30 04:30-06:00 06:00-06:30 06:30-07:30 07:30-11:00 11:00-12:30 12:30-16:00 16:00-18:00 18:00-22:00 22:00-00:00 00:00-00:30 00:30-02:00 02:00-05:00 05:00-06:00 06:00-08:00 08:00-12:00 12:00-12:30 12:30-13:30 13:30-14:30 14:30-15:00 15:00-18:00 18:00-19:00 19:00-20:00 20:00-00:00 00:00-00:30 00:30-05:00 05:00-06:00 06:00-11:00 11:00-11:30 11:30-12:00 12:00-14:30 14:30-18:30 18:30-21:30 21:30-03:00 Duration 2hr 1/2 hr 2-1/2 hr 3 hr lhr lhr 1 hr 1/2 hr 2-1/2 hr 1/2 hr 1/2 hr 5 hr 2 hr 1-1/2 hr 1 hr 1-1/2 hr 1/2 hr 1-1/2 hr 1 hr 1 hr 1/2 hr 1-1/2 hr 1/2 hr 1 hr 3-1/2 hr 1-1/2 hr 3-1/2 hr 2 hr 4hr 2 hr 1/2 hr 1-1/2 hr 3 hr 1 hr 2 hr 4hr 1/2 hr 1 hr 1 hr 1/2 hr 3hr 1 hr 1 hr 4 hr 1/2 hr 4-1/2 hr 1 hr 5 hr 1/2 hr 1/2 hr 2-1/2 hr 4 hr 3 hr 5-1/2 hr Activity Cleared Sand traps Held safety meeting Made up BHA no. 11 R.I.H. to 3300.0 ft R.I.H. to 3900.0 ft (cont...) Made up BHA no. 11 Serviced Block line Made up BHA no. 11 R.I.H. to 7000.0 ft Held safety meeting R.I.H. to 7362.0 fl R.I.H. to 9025.0 ft Functioned Circulating sub Washed to 9791.0 ft Functioned Circulating sub R.I.H. to 10000.0 fl Held safety meeting R.I.H. to 11920.0 fl Functioned Circulating sub Pulled out of hole to 10414.0 ft Functioned Circulating sub R.I.H. to 11290.0 ft Functioned Circulating sub Washed to 11920.0 ft Drilled cement to 12120.0 ft Drilled installed equipment - DV collar Pulled out of hole to 7360.0 fl Pulled out of hole to 3900.0 fl Pulled out of hole to 300.0 ft Pulled BHA Held safety meeting Made up BHA no. 12 R.I.H. to 3900.0 ft R.I.H. to 5000.0 ft R.I.H. to 7360.0 fl (cont...) R.I.H. to 10000.0 ft Held safety meeting R.I.H. to 12027.0 ft Circulated at 12027.0 ft Washed to 12122.0 ft Drilled installed equipment - Landing collar Circulated at 12058.0 ft R.I.H. to 13201.0 ft Circulated at 13243.0 ft Held safety meeting Circulated at 13243.0 ft Laid down 1200.0 ft of 5in OD drill pipe Laid down 5600.0 ft of 5in OD drill pipe (cont...) Circulated at 7400.0 ft Serviced Block line Laid down 3500.0 ft of 3-1/2in OD drill pipe Laid down 3600.0 fl of 2-7/8in OD drill pipe Pulled BHA Ran Tubing to 3200.0 ft (4-1/2in OD) Progress Report Facility PB R Pad Well R- 18B Rig Nabors 2ES Page 7 Date 27 August 98 Date/Time 22 Aug 98 23 Aug 98 24 Aug 98 03:00-06:00 06:00-08:30 08:30-09:00 09:00-11:30 11:30-12:00 12:00-12:30 12:30-18:30 18:30-20:00 20:00-20:30 20:30-22:30 22:30-00:00 00:00-00:30 00:30-01:00 01:00-01:15 01:15-01:45 01:45-02:30 02:30-03:00 03:00-06:00 06:00-07:30 07:30-09:30 09:30-12:00 12:00-12:30 12:30-14:00 14:00-16:00 16:00-00:00 00:00-00:30 00:30-06:00 Duration 3 hr 2-1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 1/2 hr 6 hr 1-1/2 hr 1/2 hr 2 hr 1-1/2 hr 1/2 hr 1/2 hr 1/4 hr 1/2 hr 3/4 hr 1/2 hr 3hr 1-1/2 hr 2hr 2-1/2 hr 1/2 hr 1-1/2 hr 2 hr 8 hr 1/2 hr 5-1/2 hr Activity Ran Tubing to 5-1/2in (4500.0 ft OD) Ran Tubing to 4500.0 ft (5-1/2in OD) (cont...) Monitor wellbore pressures Circulated at 5863.0 ft Ran Tubing to 6020.0 ft (5-1/2in OD) Held safety meeting Ran Tubing to 9366.0 ft (5-1/2in OD) Space out tubulars Installed Tubing hanger Reverse circulated at 9340.0 ft Installed Tubing hanger Held safety meeting Tested Tubing hanger Set packer at 9307.0 ft with 4500.0 psi Tested Tubing - Via string Tested Permanent packer - Via annulus Installed Accessories Rigged down BOP stack Installed Surface tree Tested Surface tree Freeze protect well - 135.000 bbl of Diesel Held safety meeting Rigged down Additional services Rig moved 50.00 % Serviced Crown block Held safety meeting Rig moved 100.00 % Client: Field: BP Exploration (Alaska), Inc. Prudhoe Bay Well Name: R-18B APl number: 50-029-20633-02 Job number: 4000-2736 Rig: Nabors 2ES County: NSB State: AK Survey Calculations Calc method for positions: Minimum Curvature Calc method for DLS: Mason & Taylor Depth references Permanent datum MSL 0 ft Depth reference KB 49.13 ff GLabove Permanent 20.81 ft KB above Permanent 49.13 ft DF above Permanent 47.73 ft Vertical section origin Latidude (+N/S-): 1763.04 ft Departure (+E/W-): 292.54 ft Azim from RT to target: 55.68 degrees Schlumberger ANADRILL Survey Report ORIGINAL Spud Date: Last survey date: Total accepted surveys: MD of first survey: MD of last survey: Projected survey: SEP 2 I998 10-Aug-98 158 6400.13 ft 13221.91 It 13279.97 fl Geomagnetic data Magnetic Model: BGGM 1997 Version Magnetic Date: 20-Jul-98 Magnetic field strength: 1146.41 HCNT Magnetic dec (+E/W-): 27.84 degrees Magnetic Dip: 80.73 degrees MWD Survey Reference Criteda Reference G: Reference H: Reference Dip: Tolerance G: Tolerance H: Tolerance Dip: 1002.68 milliG 1146.35 HCNT 80.73 degrees 3 milliG 6 HCNT 0.3 degrees Correction Magnetic dec (+ENV-): Gdd convergence (+ENV-): Total az corr (+E/W-): 27.84 degrees 0 degrees 27.84 degrees Seq Measured Incl Azimuth Course # Depth angle angle length (ft) (deg) (deg) (ft) I 6400.13 39.80 17.2 0.0 2 6511.80 36.81 19.3 111.7 3 6543.20 34.20 23.1 31.4 4 6575.44 31.24 27.0 32.2 5 6607.73 28.91 31.0 32.3 6 6638.15 26.80 34.7 30.4 7 6670.67 25.59 38.7 32.6 8 6701.23 24.36 42.6 30.5 9 6733.71 23.02 48.4 32.5 10 6766.47 21.87 54.7 32.8 11 6798.09 20.85 58.0 31.6 12 6829.75 20.71 59.1 31.6 13 6923.58 18.30 59.3 93.9 14 7019.42 17.75 58.7 95.8 15 7113.26 17.44 58.6 93.9 16 7209.56 17.08 57.6 96.3 17 7305.33 16.74 57.1 95.7 TVD depth (ft) 5813.36 5901.01 5926.57 5953.66 5981.61 Vertical section (ft) 1235.64 1290.58 1305.59 1320.55 1334.99 Displacement +N/S- +ENV- (f0 ¢) t763.04 292.54 1828.79 314.18 1845.79 320.75 1861.56 328.09 1875.72 335.92 6008.49 6037.74 6O65.39 6095.16 6125.48 1348.07 1887.66 343.61 1361.67 1899.19 352.19 1374.10 1908.97 360.57 1386.93 1918.12 369.86 1399.40 1925.91 379.65 6154.91 6184.45 6272.96 6364.05 6453.56 1410.91 1932.29 389.22 1422.11 1938.14 398.78 1453.40 t954.20 425.71 1482.99 1969.46 451.12 1511.34 1984.23 475.36 6545.53 6637.09 1 1 Page 539.88 1999.32 499.62 567.71 2014.34 523.06 t Total at Azm DLS displacement (deg/ (fi) (deg) 100f) 1787.15 9.42 0.00 1855.58 9.75 2.92 1873.45 9.86 10.88 1890.25 10.00 11.28 1905.56 10.15 9.51 1918.67 10.32 8.97 1931.57 10.51 6.56 1942.72 10.70 6.74 1953.45 10.91 8.27 1962.97 11.15 8.12 1971.10 11.39 4.99 1978.74 11.63 1.31 2000.03 12.29 2.57 2020.47 12.90 0.61 2040.37 13.47 0.33 2060.80 14.03 0.48 2081.14 14.56 0.39 Schlumberger ANADRILL Survey I~ort Seq Measured Incl Azimuth Course # Depth angle angle length (ft) tdeg) (deg) (fi) 18 7400.81 16.35 55.8 95.5 19 7496.31 15.75 54.3 95.5 20 7590.03 16.51 57.0 93.7 TVD depth (ft) Vertical Displacement section +N/S- +E/W- (ft) (ft) (ft) 6728.63 1594.90 2029.37 545.72 6820.41 1621.30 2044.49 567.36 6910.42 1647.32 2059.16 588.86 Total at Azm DLS displacement (deg/ (ft) (deg) 100f) 2101.46 15.05 0.56 2121.75 15.51 0.76 2141.70 15.96 1.14 21 7685.72 17.95 61.1 95.7 22 7778.72 18.28 64.8 93.0 23 7875.70 18.12 65.3 97.0 24 7970.00 17.55 64.9 94.3 25 8066.02 16.98 63.2 96.0 7001.83 1675.60 2073.69 613.17 7090.22 1704.27 2086.83 638.92 7182.37 1734.16 2099.61 666.39 7272.14 1762.65 2111.77 692.59 7363.81 1790.84 2124.23 718.20 2162.45 16.47 1.97 2182.45 17.02 1.29 2202.82 17.61 0.23 2222.44 18.16 0.62 2242.36 18.68 0.79 26 8160.95 16.47 61.9 95.0 27 8256.83 17.21 64,8 95.8 28 8352.48 16.88 64.5 95.7 29 8448.41 16.40 65.0 95.9 30 8544.41 17.25 64.7 96.0 7454.79 1817.98 2136.83 742.47 7546.49 1845.47 2149.26 767.27 7637.98 1873.18 2161.27 792.62 7729.87 1900.30 2172.98 817.46 7821.76 1927.73 2184.79 842.61 2262.14 19.16 0.67 2282.11 19.65 1.17 2302.03 20.14 0.36 2321.66 20.62 0.52 2341.65 21.09 0.89 31 8639.99 18.07 65.2 95.6 32 8733.55 17.88 64.9 93.6 33 8828.52 18.70 65.1 94.9 34 8924.44 18.39 64.8 95.9 35 9019.39 18.01 63.4 95.0 7912.85 1956.35 2197.07 868.88 8001.88 1984.85 2209.25 895.07 8091.99 2014.25 2221.86 922.05 8182.91 2044.35 2234.80 949.68 8273.16 2073.70 2247.76 976.37 2362.64 21.58 0.87 2383.69 22.06 0.23 2405.59 22.54 0.86 2428.21 23.02 0.33 2450.65 23.48 0.61 36 9111.49 16.93 63.9 92.1 37 9208.56 17.50 64.2 97.1 38 9303.37 16.70 63.7 94.8 39 9399.82 17.14 62.4 96.4 40 9476.95 16.31 61.6 77.2 8361.01 8453.75 8544.36 8636.59 8710.52 2101.08 2260.03 1001.14 2129.51 2272.61 1026.98 2157.10 2284.85 1052.03 2184.92 2297.56 1077.03 2207.00 2307.99 1096.65 2471.85 23.89 1.18 2493.88 24.32 0.59 2515.41 24.72 0.86 2537.48 25.12 0.60 2555.28 25.41 1.12 41 9567.75 22.00 53.3 90.7 42 9598.98 33.02 50.5 31.3 43 9631.72 43.27 47.5 32.7 44 9663.19 53.73 44.6 31.5 45 9695.49 63.95 44.5 32.3 8796.18 8823.90 8849.59 8870.43 8887.12 2236.67 2324.22 1121.50 2251.07 2333.17 1132.81 2271.09 2346.45 1147.99 2294.30 2362.83 1164.92 2321.39 2382.50 1184.28 2580.65 25.76 6.94 2593.64 25.90 35.44 2612.22 26.07 31.85 2634.39 26.24 33.91 2660.61 26.43 31.64 46 9727.98 71.88 44.5 32.5 47 9759.57 73.96 48.2 31.6 48 9790.58 76.04 50.2 31.0 49 9823.31 78.51 53.2 32.7 50 9854.25 79.63 56.4 30.9 8899.33 8908.62 8916.64 8923.84 8929.70 2350.91 2403.96 1205.37 2380.71 2424.81 1227.23 2410.46 2444.37 1249.89 2442,27 2464.13 1274.92 2472.60 2481.61 1299.71 2689.23 26.63 24.40 2717.68 26.84 12.98 2745.39 27.08 9.16 2774.41 27.36 11.71 2801.37 27.64 10.79 51 9885.71 82.23 58.6 31.5 52 9917.51 85.47 59.7 31.8 53 9948.76 88.59 60.2 31.3 54 9980.52 91.40 60.2 31.7 55 10012.97 94.29 59.9 32.5 8934.67 8938.08 8939.7 8939.7 8938.09 2503.69 2535.24 2566.41 2598.01 2630.37 2498.32 1325.94 2514.53 1353.08 2530.18 1380.14 2545.94 1407.64 2562.14 1435.76 2828.38 27.96 10.76 2855.47 28.28 10.75 2882.12 28.61 10.09 2909.17 28.94 8.86 2937.00 29.27 8.94 56 10044.33 95.77 57.2 31.3 57 10076.44 95.87 58.9 32.1 58 10106.85 95.59 57.8 30.5 59 10138.79 95.32 59.5 31.9 60 10170.53 95.18 57,7 31.7 8935.34 8932.09 8929.04 8926.01 8923.11 2661.51 2578.40 1462.36 2693.41 2595.30 1489.46 2723.73 2611.23 1515.29 2755.44 2627.75 1542.41 2786.96 2644.19 1569.35 2964.23 29.56 9.81 2992.34 29.85 5.28 3019.04 30.13 3.70 3046.98 30.41 5.37 3074.84 30.69 5.67 61 10202.32 95.12 59.3 31.8 62 10234.60 92.47 59.7 32.3 8920.25 8918.12 2818.60 2850.75 Page 2 2660.74 1596.35 2677.10 I624.12 3102.88 30.96 5.01 3131.23 31.24 8.30 Schlumber~ler ANADRILL Survey ~/~ort Seq Measured Incl Azimuth Course # Depth angle angle length (ft) (deg) (deg) (fi) ']'VD depth (ft) Vertical Displacement secaon +N/S- +E/W- (~) (ft) Total at Azm DLS displacement (deg/ (fi) (deg) 100f) 63 10266.11 90.31 60.8 31.5 64 10297.88 90.00 60.8 31.8 65 10329.79 90.69 61.6 31.9 8917.35 8917.27 8917.08 2882.14 2913.81 2945.56 2692.72 1651.46 2708.24 1679.22 2723.60 1707.17 3158.81 31.52 7.69 3186.58 31.80 0.97 3214.41 32.08 3.31 66 10361.76 90.79 60.6 32.0 67 10394.06 90.58 62.1 32.3 68 10425.27 89.90 60.6 31.2 69 10457.30 87.67 59.1 32.0 70 10489.19 86.16 59.6 31.9 8916.66 8916.28 8916.15 8916.82 8918.54 2977.42 2739.07 1735.18 3009.56 2754.55 1763.53 3040.60 2769.51 1790.91 3072.51 2785.58 1818.57 3104.29 2801.82 1845.97 3242.43 32.35 3.14 3270.72 32.63 4.69 3298.11 32.89 5.28 3326.65 33.14 8.40 3355.26 33.38 4.99 71 10520.73 83.68 58.6 31.5 72 10551.97 82.30 56.8 31.3 73 10584.02 82.30 54.4 32.0 74 10616.10 82.54 53.5 32.1 75 10648.06 82.23 55.9 32.0 8921.33 8925.15 8929.44 8933.67 8937.91 3135.61 3166.66 3198.36 3230.17 3261.88 2817.93 1872.89 2834.53 1899.15 2852.44 1925.31 2871.17 1951.04 2889.49 1976.92 3383.55 33.61 8.48 3411.93 33.82 7.21 3441.40 34.02 7.43 3471.33 34.20 2.88 3501.05 34.38 7.50 76 10679.42 81.82 55.4 31.3 77 10711.79 81.41 53.0 32.4 78 10743.76 81.02 55.2 32.0 79 10775.13 81.58 55.9 31.3 80 10807.02 83.44 54.8 31.9 8942.26 8946.98 8951.87 8956.60 8960.76 3292.88 3324.92 3356.53 3387.47 3419.09 2906.98 2002.51 2925.73 2028.51 2944.27 2054.12 2961.78 2079.64 2979.76 2105.65 3529.96 34.56 2.05 3560.16 34.73 7.44 3590.01 34.90 6.90 3618.98 35.07 2.84 3648.66 35.25 6.76 81 10839.29 84.54 56.2 32.3 82 10869.91 85.37 54.9 30.6 83 10900.29 87.26 55.5 30.4 84 10932.78 88.59 54.6 32.5 85 10965.40 90.38 56.2 32.6 8964.14 8966.84 8968.79 8969.97 8970.26 3451.21 2997.95 2132.13 3481.69 3015.19 2157.26 3512.03 3032.51 2182.17 3544.50 3051.11 2208.79 3577.10 3069.62 2235.62 3678.81 35.42 5.49 3707.45 35.58 5.03 3736.04 35.74 6.52 3766.70 35.90 4.94 3797.44 36.07 7.36 86 10996.57 90.62 54.9 31.2 87 11027.82 92.09 57.4 31.2 88 11059.60 93.22 57.8 31.8 89 11091.78 96.05 55.8 32.2 90 11123.11 97.12 55.6 31.3 8969.99 8969.25 8967.78 8965.17 8961.59 3608.30 3639.49 3671.23 37O3.32 3734.41 3087.27 2261.35 3104.64 2287.25 3121.66 2314.07 3139.23 2340.92 3156.75 2366.61 3826.87 36.22 4.24 3856.20 36.38 9.29 3885.83 36.55 3.77 3915.95 36.71 10.75 3945.37 36.86 3.48 91 11153.59 97.60 55.3 30.5 92 11185.64 97.49 54.9 32.0 93 11217.53 95.63 53.3 31,9 94 11249.62 96.11 55.9 32.1 95 11281.79 96.45 53.2 32.2 8957.68 8953.48 8949.83 8946.55 8943.03 3764.66 3173.91 2391.52 3796.38 3192.06 2417.54 3828.06 3210.64 2443.21 3859.98 3229.14 2469.23 3891.98 3247.70 2495.31 3974.05 37.00 1.85 4004.22 37.14 1.29 4034.54 37.27 7.67 4065.03 37.40 8.19 4095.62 37.54 8.40 96 11314.41 95.84 54.2 32.6 97 11344.16 93.05 52.4 29.8 98 11376.51 92.26 52.4 32.3 99 11408.35 91.16 50.8 31.9 100 11441.00 89.90 50.4 32.6 8939.54 8937.23 8935.73 8934.78 8934.48 3924.37 3954.05 3986.26 4018.07 4050.54 3266.89 2521.43 3284.64 2545.25 3304.33 2570.81 3324.13 2595.80 3344.82 2620.99 4126.76 37.66 3.58 4155.38 37.77 11.13 4186.60 37.88 2.45 4217.58 37.99 6.08 4249.40 38.08 4.06 101 11472.69 88.01 49.9 31.7 102 11502.80 86.43 51.7 30.1 103 11534.70 87.12 51.3 31.9 104 11565.79 86.57 53.9 31.1 105 11597.75 84.51 53.4 31.9 8935.05 8936.51 8938.31 8940.02 8942.50 4082.08 4112.03 4143.80 4174.80 4206.59 3365.13 2645.32 3384.13 2668.61 3403.96 2693.54 3422.82 2718.21 3441.67 2743.82 4280.40 38.17 6.17 4309.74 38.26 7.95 4340.75 38.35 2.50 4370.85 38.45 8.53 4401.55 38.56 6.64 106 11629.23 83.34 55.6 31.5 107 11658.18 83.41 54.3 29.0 8945.84 8949.18 4237.90 4266.70 P~e3 3459.86 2769.32 3476.40 2792.90 4431.67 38.67 7.88 4459.33 38.78 4.46 Schlumberger ANADRILL Survey k~.l~ort Seq Measured Incl Azimuth Course # Depth angle angle length ~ft) (deg) (deg) (fi) 108 11689.90 83.58 55.4 31.7 109 11722.17 83.61 53.9 32.3 110 11752.13 83.30 52.9 29.9 depth (fi) 8952.77 8956.38 8959.79 Ve~cai Displacement section +N/S- +ENV- (~) (~) (~) 4298.20 3494.53 2818.65 4330.29 3513.10 2844.83 4359.97 3530.81 2868.68 Total at Azm DLS displacement ~eg/ (fi) ~eg) 100~ 4489.60 38.89 3.49 4520.50 39.00 4.62 4549.28 39.09 3.48 111 11781.38 82.89 55.4 29.3 112 11816.55 83.06 54.6 35.2 113 11848.81 84.85 54.0 32.2 114 11880.20 86.71 55.6 31.4 115 11911.92 88.39 56.9 31.7 8963.31 8967.61 8971.00 8973.31 8974.67 4389.04 3547.85 2892.25 4423.98 3567.88 2920.87 4455.99 3586.57 2946.87 4487.30 3604.62 2972.46 4518.96 3622.21 2998.79 4577.37 39.19 8.59 4611.00 39.31 2.31 4641.93 39.41 5.86 4672.13 39.51 7.80 4702.47 39.62 6.70 116 11944.37 90.31 57.2 32.5 117 11976.34 92.71 57.7 31.9 118 12007.48 94.87 59.9 31.2 119 12039.55 97.60 58.9 32.0 120 12071.20 99.13 58.6 31.7 8975.04 8974.20 8972.14 8968.66 8964.05 4551.45 4583.32 4614.40 4646.14 4677.46 3639.89 3026.06 4733.48 39.74 5.98 3657.04 3052.94 4763.86 39.86 7.69 3673.17 3079.56 4793.32 39.98 9.87 3689.36 3106.94 4823.33 40.10 9.08 3705.63 3133.75 4853.05 40.22 4.92 121 12103.39 98.88 58.3 32.2 122 12135.15 98.63 59.6 31.8 123 12167.36 98.67 61.0 32.2 124 12198.31 98.60 58.9 30.9 125 12230.12 98.67 58.4 31.8 8959.01 8954.17 8949.33 8944.69 8939.91 4709.23 4740.60 4772.33 4802.80 4834.19 3722.27 3160.86 4883.27 40.34 1.20 3738.48 3187.78 4913.06 40.45 4.12 3754.25 3215.43 4943.02 40.58 4.30 3769.55 3241.88 4971.85 40.70 6.72 3785.91 3268.72 5001.76 40.81 1.57 126 12261.95 99.29 58.0 31.8 127 12293.72 99.36 57.5 31.8 128 12325.76 99.39 57.4 32.1 129 12353.42 99.30 58.5 27.6 130 12385.35 98.18 58.4 32.0 8934.95 4865.57 3802.46 3295.42 5031.75 40.91 8929.79 4896.93 3819.20 3321.96 5061.79 41.02 8924.57 4928.59 3836.24 3348.65 5092.18 41.12 8920.08 4955.80 3850.70 3371.74 5118.25 41.21 8915.22 4987.39 3867.24 3398.69 5148.46 41.31 2.31 1.57 0.32 3.95 3.51 131 12417.58 95.80 59.0 32.2 132 12449.41 92.43 59.2 31.8 133 12481.64 88.90 59.6 32.2 134 12513.52 85.64 61.1 31.9 135 12544.82 84.92 60.8 31.3 8911.30 8909.02 8908.65 8910.17 8912.74 5019.30 5050.96 5083.09 5114.84 5145.90 3883.85 3426.00 5178.97 41.42 7.62 3900.13 3453.21 5209.19 41.52 10.62 3916.52 3480.92 5239.84 41.63 11.03 3932.28 3508.61 5270.02 41.74 I1.25 3947.43 3535.88 5299.49 41.85 2.49 136 12576.51 84.61 60.8 31.7 137 12608.46 84.47 59.5 32.0 138 12640.57 84.03 59.1 32.1 139 12672.50 83.37 60.3 31.9 140 12704.32 82.99 60.2 31.8 8915.64 8918.68 8921.90 8925.40 8929.17 5177.34 5209.10 5240.98 5272.60 5304.08 3962.83 3563.43 5329.36 41.96 0.98 3978.68 3591.06 5359.63 42.07 4.07 3994.99 3618.52 5390.14 42.17 1.85 4010.99 3645.90 5420.39 42.27 4.27 4026.65 3673.31 5450.43 42.37 t.24 141 12736.44 83.10 59.2 32.1 142 12768.39 82.99 59.7 32.0 143 12799.60 83.79 58.3 31.2 144 12830.12 84.78 59.1 30.5 145 12862.26 85.51 57.6 32.2 8933.06 5335.86 4042.73 3700.82 5480.85 42.47 8936.94 5367.56 4058.88 3728.18 5511.24 42.57 8940.53 5398.50 4074.84 3754.74 5540.97 42.66 8943.57 5428.80 4090.60 3780.67 5570.15 42.75 8946.29 5460.85 4107.44 3807.98 5601.05 42.83 3.11 1.59 5.14 4.17 5.17 146 12893.46 87.12 57.0 31.2 147 12925.46 90.10 55.1 32.0 148 12957.38 93.53 52.9 31.9 149 12989.05 96.15 53.3 31.6 150 13021.20 97.36 51.3 32.2 8948.30 8949.07 8948.06 8945.40 8941.61 5491.97 5523.96 5555.82 5587.28 5619.19 4124.26 3834.18 5631.21 42.91 5.51 4142.12 3860.72 5662.36 42.99 11.04 4t60.86 3886.51 5693.65 43.05 t2.77 4179.76 3911.68 5724.66 43.10 8.39 4199.32 3936.98 5756.22 43.15 7.22 151 13052.17 97.28 51.3 31.0 152 13084.11 97.49 51.2 31.9 8937.66 8933.56 5649.85 5681.39 Page 4 4218.54 3960.98 5786.66 43.20 0.26 4238.34 3985.65 5817.98 43.24 0.73 Schlumberger ANADRILL Survey I~=---port '--.~ Seq Measured Incl Azimuth Course TVD Vertical Displacement Total at Azm DLS # Depth angle angle length depth section +N/S- +E/W- displacement (deg/ (fi) (deg) (deg) (fi) (fi) (fi) (fi) (fi) (fi) (de.g) 1000 153 13115.09 97.42 51.2 31.0 8929.53 5712.04 4257.60 4009.61 5848.43 43.28 0.23 154 13147.05 97.53 52.8 31.9 8925.38 5743.60 4277.07 4034.53 5879.69 43.33 4.98 155 13178.59 97.67 53.1 31.6 8921.20 5774.89 4295.95 4059.53 5910.58 43.38 1.04 156 13210.60 98.32 50.2 32.0 8916.75 5806.49 4315.60 4084.38 5941.93 43.42 9.20 157 13221.91 98.25 52.4 11.3 8915.12 5817.64 4322.60 4093.10 5953.01 43.44 19.27 158 13279.97 98.25 52.3 58.1 8906.79 5875.04 4357.72 4138.63 6009.82 43.52 0.17 Suwey158 pr~e~edto b~ Page 5 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrle NO. 11460 Company: Field: Alaska OII & Gas Cons Comm Attn: Lorl Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) 8/21/98 Well Job # Log Description Date BL RF Sepia LIS Tape q~, 00'3 A-41 PERFORA'IING RECORD 980727 ! 1 A-41 JEWELRY LOG 980727 1 1 B-12A PERFORATING RECORD 980721 I 1 E-16 IBP SETrlNG RECORD . . 980729 I I G-09 PERFORATING RECORD ., . . 980724 1 1 G-15 WHIPSTOCK SEI'rlNG RECORD 980716 1 1 G-15 WHIPSTOCK SETTING RECORD i . 980729 I I .. G-29 J ,E-'WI;LRY ~OG ~ , 980,,725 I 1 G-29 PERFORATING RECORD 980729 1' "1 K-6 CHEMICAL CUT TUBING .' 98 O 712 1 I . · K-6 JET CUTTER RECORD 9 S 0714 1 , 1 . . R-OS' LEAK DETECTION 980713 .1 .1 R-14 PERFORATION RECORD , ' 980722 1 , 1 R-leA CHEMICAL CUT RECORD 980709 1 R-18B ..; SET 9 5/8" EZSV 980727 . I 1 u-2 LEAK D~mcTION · 980717 ! , 1 X-04 PERFORATION RECORD 980713 I 1 z.3 PERFORA~UG RECORD 98O719 1 Z-3 PERFORATING RECORDS $ $ 0730 1 1 . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP ExPlOration (Alaska) Inc. Pett0teCthiCal Da{a Center MB3-3 900 E. BensOn Blvd. Anchorage, Alaska 99519-6612 Date Delivered: RECEIVED': AUG 27 1998 Alaska Oil & Gas Cons, Commission Schlumberger GeoQuest 500"Wi Interhati°nal AirpOrt Road AnChorage, Alaska 99618-1199 , MEMORANDUM TO: David Johns~~ Chairman THRU: Blair Wondzell, P. I. Supervisor State of Alaska Alaska Oil and Gas Conservation Commission DATE: July 25, 1998 FILE NO: AIMJGYFE.DOC FROM' Lou Grimaldi,U~-~..~¢ SUBJECT: Petroleum InslSector BOPE Test Nabors 2ES BPX well #R-18 Prudhoe Bay Field PTD #98-¢t'T' I1~ Saturday, July 25, 1998: I witnessed the Initial BOPE test on Nabors rig 2ES which was performing a redrill on BPX well #R-18 in the Prudhoe Bay field. This rig had just come out of 3 days of summer maintenance. The rig was ready to test when i arrived and we began immediately. All BOPE equipment was tested with no failures observed. The Gas detectors were calibrated and checked "OK" while I was there. The test time of 4 hours is not normal for this rig and was caused by a leaking pressure sensor line on the chart recorder. The rig was in fair shape as was the area surrounding it. SUMMARY: I witnessed the initial test of the BOPE on Nabors rig #2ES which is redrilling Arco well #DS 18-9 in the Prudhoe Bay Field. There were no failures observed. Test time 4 hours. Attachments: AIMJGYFE.XLS CC: Steve Walls/John Raul (Shared Services Drilling) NON-CONFIDENTIAL STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: Test: Initial X Workover: NABORS Rig No. 2ES PTD # BPX Rep.: R-18B Rig Rep.: 7" Set @ 9,400 Location: Sec. X Weekly Other ~,~ DATE: 7/25/98 98- Rig Ph.# 659-4836 Sheridan Whip Charlie Henley 32 T. 12N R. 13E Meridian Um. TEST DATA MlSC, INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location YES Standing Order Posted YES Well Sign OK Drl. Rig OK Hazard Sec. YES BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. P/F 1 250/2500 P 1 250/5000 P 1 250/5000 P 1 250/5000 P I 250/5000 P 2 250/5000 P 1 250/5000 P N/A MUD SYSTEM: Visual Alarm Trip Tank OK OK Pit Level Indicators OK OK Flow Indicator OK OK Kleth Gas Detector P P -fi, 2S Gas Detector P P FLOOR SAFETY VALVES: Upper Kelly/IBOP Lower Kelly/IBOP Ball Type Inside BOP Test Quart. Pressure P/F 1 25O\5000 P 1 250\5000 P I 250\5000 P 1 250\5000 P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes Test Pressure P/F 14 250\5000 P 32 25O\5OOO P I P Functioned Functioned ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 4 @2100 3,000 P 1,750 P 0 minutes 29 sec. minutes 26 sec. YES Remote: YES Psig. TEST RESULTS Number of Failures: 0 ,Test Time: 4.0 Hours. Number of valves tested 23 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Good test. Distribution: orig-Well File c- Ooer./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X' NO Waived By: Witnessed By: Lou Grimaidi FI-021L (Rev.12/94) Aimjgyfe.xls J[ ' -. hared ervices tilling BP EXPLORATION (ALASKA) FAX # (907) S64-5193 FAX COVER SHEET TO: COMPANY: LOCATION: Blair Wondzell AOGCC Anchora~le FAX #: 276-7542 FROM: LOCATION: PAGES TO FOLLOW: Terrie Hubble SHARED SERVICES DRILLING ANCHORAGE, ALASKA PHONE #: 564-4628 1 DATE: 07-16-98 COMMENTS: Hi Blair, Re: R-18B, Permit #98-119 Chris Brown, the engineer for this well, just discovered an error in the first paragraph under the Hazards heading of this permit. He had 'reused' an old form and overlooked the old information listed there. This permit, which was approved 07/10/98, was permitted as a producer, not an injector. How would you like us to proceed? ~, (I thought I would give you a chance to look it over before we talked...) Thanks! (907) 564-4628 Well Control Well control equipment consisting of 5000 psi w.p. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics on file with AOGCC. Bottom hole pressure is expected to be 3400psi @ 8750' TYDSS Maximum expected surface pressure at 8750' TVDSS is 2525psi (assuming gas column of 0. lpsi/ft) Hazards The main production target for this well is Zone 4. The main hazard for this well is drilling next to R-17 which has a frac in Zone 4. A total of 4 faults will also be crossed in the polygon which have a maxi- mum of 25'throw. Recent wells drilled in a nearby part of the field have not experienced severe losses, hence although preparations should be made to pump PCM, lost circulation is not expected to be a major problem because of faulting. _Sag River The Sag River can sometimes have very low reservoir pressure in this area. For this well the Sag is prognosed to have a 2500psi or 5.52ppg ElVlW. Lost circulation is expected to be a problem through the Sag, although the pad data sheet indicates that only one well (R-36i) has experienced ma- jor lost circulation in this production interval, most other drilling wells experiencing only minor losses. The area has some faults (which if present may be conductive), and this well does cross four 10-25' faults while in the target polygon, hence losses should be expected. Productive zone LCM will be em- ployed to combat this. On the R-36i well, returns were also not obtained while cementing the casing in place. Losses should be cured before attempting to run casing. Risk of differential sticking is expected based on offset wells, but should be mitigated by the use of Quikdriln drilling fluid which is solids free. Iyishak Differential sticking has occurred frequently in the Ivishak at 9183' TVD. Once the sticking occurs it is very strong and has created difficulty in freeing up the drillstring. On R-35A, the sticking was success- fully alleviated by pumping a 20bbl pill of Liquid Casing, OM Seal, and Barafibre and reducing pump rate to 5bpm (to reduce ECD). Note however that these wells were drilled using LSND mud; since this well will employ solids free Quikdriln, this should mitigate the risk of sticking. High torque has been re- ported on several wells in the production hole, hence some open hole lubrication may be required. The pa,d data sheet incorporates wells from R, F and J pad as the bottom hole location of these wells are all in the same area. Wells from all three pads have experienced problems with bridges, tight hole, differential stibking, and packing off while in the production interval. This has caused numerous incidents of stuck logs, casing, and drillstring. This is a high potential stuck pipe area - be alert while driling this interval and employ frequent reaming if any sign of unstable hole is seen. Disposal All cuttings should be hauled to the ball mill at CC-2A for disposal. Haul all drilling and completion fluids and other Class I1 wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. 1 6 ' 998 Oil & Cx commi i0n Well Control Well control equipment consisting of 5000 psi w.p. pipe rams, installed and is capable of handling maximum potential surface system schematics on file with AOGCC. Bottom hole pressure is expected to be 3400psi @ 8750' Maximum expected surface pressure at 8750' TVDSS and annular preventer will be Diverter, B OPE and mud fluid )si (assuming gas column of Hazards The main injection target for this well is River, although the Ivishak main hazard for this well is the crossing Boundary Mapped Fault at the field. This is a 300' fault which may severe lost circulation and problems (this fault has been drilled ce before and significant lost rations should be made to pump when the well is about to cross be penetrated. The boundary of the tight hole or other did not appear). Prepa- major fault. Sag River The Sag River can sometime, very low reservoir prognosed to have a 250 si or 5.52ppg EMW. Lost ci through the Sag, althou the pad data sheet indicates jor lost circulation in th production interval, most other The area has some ts (which if present may be faults while in the polygon, hence losses ployed to combat t s. On the R-36i well, returns place. Losses d be cured before based on offset slls, but should be mitigated this area. For this well the Sag is is expected to be a problem one well (R-36i) has experienced: wells experiencing only minor ..), and this well does cross four 0-25' be expected. Productive zone LCM wi] ~e em- also not obtained while cementing in run casing. Risk of differential sticking expected use of Quikdriln drilling fluid which i~ ,olids free. Ivishak sticking has occurred in the Ivishak at 9183' TVD. Once the very strong and has created difficulty freeing up the drillstring. On R-35A, the fully alleviated by pumping a 20bbl ill of Liquid Casing, OM Seal, and rate to 5bpm (to reduce ECD). however that these wells were drilled using well will employ solids free this should mitigate the risk of sticking. ported on several wells in the hole, hence some open hole pad data sheet incorporates .s from R, F and J pad as the bottom hole the same area. Wells from three pads have experienced problems with sticking, and packing off bile in the production interval. This has cause. logs, casing, and g. This is a high potential stuck pipe area - and employ frequent if any sign of unstable hole is seen. occurs it is was success- reducing pump mud; since this torque has been re- a may be required. The of these wells are all in tight hole, differential numerous incidents of stuck while driling this interval Disposal All cuttings sh be hauled to the ball mill at CC-2A Haul all drilling and completion fluids and otl~ Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. Operations Summary Pre-Rig Work: NOTE: If any problems with the 9-5/8" packoff are observed during pre-rig work, contact the well- head manufacturer to initiate repairs and inform the Operations Drilling Engineer. o R/U wireline and retrieve SSSV. Dummy off GLM's if required. Test 9-5/8" packoff to 5,000psi if not recently tested (<1 month). POOH. If tubing and annulus have not recently (<1 month) been tested, and tubing has integrity, pressure test to 3,000psi. ° Perform a full-bore cement abandonment of the existing perforations at 10,100-11,041'. Highest ac- ceptable TOC is 8000' in order to leave room to section mill at required depth for kick-off. Let the plug set up, then pressure test to AOGCC requirements. ° R/U electric line unit and chemical cutter for 5-1/2" tubing. RIH and tag cement plug at +/-8000'. Pull back and chemical cut 5-1/2" tubing at +/-7000', avoiding collars. Note that the tubing is plastic coated, and will therefore require that a double anchor system and acid cylinder is used. RD electric line unit. 4. Circulate seawater through the tubing cut until clean returns are obtained. Freeze protect tubing and annulus to 2,200ft with diesel. Bleed pressures on tubing/annulus. Zero psi on all annuli required. 5. Set and test BPV. Remove wellhouse and flowlines, level pad, dig out cellar. Rig Work: o Prior to rig move, test 9-5/8" packoff to 5,000psi, and function lock down screws (FMC wellhead representative to do this). If any problems with the 9-5/8" packoff are observed, contact the wellhead manufacturer to initiate repairs. 2. MIRU. Circulate the well to clean seawater. Pull BPV and set/test TWCV. ND tree, NU BOP's and test same. Pull TWCV. 3. Retrieve 5-1/2" tubing from chemical cut at 7000'. If tubing parts, RIH with fishing assembly and retrieve remaining tubing. , R/U wireline unit and set EZSV in 9-5/8" at +/-6635' (placed for window kick off at 6495'). R/D electric line unit. RIH with milling assembly and mill section in 9-5/8" casing from 6490'-6535'. POOH. RIH with cementing stinger and lay cement kick off plug across section from 6290'-6635'. POOH. o RIH with 8.5" drilling assembly and dress cement to 6400'. Directionally drill ahead and kick off at 6495'. Drill ahead at least 20' before displacing well to drilling fluid (to avoid cement contamination of fluid). Drill section to TD of 9502' as per directional plan. 6. M/U and run 3157' of 7" solid L80 IBT liner to hang off depth in 9-5/8" of _+6345'. Cement liner in place, and set liner hanger/packer. 7. RIH with 6" drilling assembly with 4 phase resistivity LWD and tag TD of new hole. Displace well to Quikdriln, and drill section to TD of 13367' as per directional plan. 8. RIH with DPC conveyed Platform Express logging string and log well from 7" liner shoe to TD. o M/U and run 2010' of 4-1/2" solid 13Cr80 NSCT liner with 2010' of 4-1/2" slotted 13Cr80 liner to hang off depth in 7" of 9346' (+200' above Sag River). Cement liner in place with the Banzai ce- menting technique, and set liner hanger/packer. 10. R/U and run 5-1/2" x 4-1/2" 13Cr80 completion with 5-1/2" SSSV, 7"x4-1/2" production packer set at +9246', 5 GLM's, and standard WOA tailpipe stabbed into 4-1/2" liner top. Circulate freeze pro- tection to _+2,200'MD. Land completion and set packer. Set and test TWCV, ND BOP, NU tree. Pull TWCV and set/test BPV. RDMO. TONY KNOWLES, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 July 10, 1998 Dan Stone Engineering Supervisor BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit R-18B BP Exploration (Alaska) Inc Pcrmit No. 98-119 Sur. Loc. 3405~SNL. 3613'WEL. Scc. 32. TI2N. R13E. UM Btmnhole Loc. 1013'NSL. 4690'WEE Sec. 28. T12N. R13E. UM Dear Mr. Stone: Enclosed is thc approved application for permit to rcdrill thc above referenced well. Thc permit to rcdrill docs not exempt you from obtaining additional permits required bv law from other governmental agcncics, and docs not authorize conducting drilling operations until all other required permitting dctcrminations arc made. Blowout prevention cquipmcnt (BOPE) must bc tcstcd in accordancc with 20 AAC 25 035. Sufficient noticc (approximatcly 24 hours) must be given to alloxv a rcprcscntativc of the Commission to witness a test of BOPE installcd prior to drilling nev~- hole. Notice max; be given by contacting thc Comlnission pctrolcum ficld inspector on thc North Slope pager at 659-3607. David W. Jolmston Chairman BY ORDER OF THE COMMISSION dlf/Enclosurcs CC: Dcpartment of Fish &Gamc, Habitat Scction w/o cncl. Department of Environmental Conservation w/o cncl. STATE OF ALASKA · ALASKA,.-:;~L AND GAS CONSERVATION corVfMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] Deepenl [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 49.13' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028278~'' 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 3405' SNL, 3613' WEL, SEC. 32, T12N, R13E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 4288' NSL, 2357' WEL, SEC. 32, T12N, R13E, UM R-18B At total depth 9. Approximate spud date Amount $200,000.00 1013' NSL, 4690' WEL, SEC. 28, T12N, R13E, UM 07/20/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028279, 590'I R-18A, 7' at 6600' MD 2560 13367' MD / 8840' TVDss 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}~Or,3 Kick Off Depth 6495' Maximum Hole Angle 99° Maximum surface 2525 psig, At total depth (TVD) 8750'/34U0 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 8-1/2" 7" 26# L-80 BTC-Mod 3157' 6345' 5722' 9502' 8680' 584 sx Class 'G' 6" 4-1/2" 12.6# 13Cr80 NSCT 4021' 9346' 8531' 13367' 8840' 232 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary ,I~ '.~,' '~ 0 Total depth: measured 11066 feet Plugs (measured) ... u true vertical 8885 feet Effective depth: measured 11034 feet Junk (measured) ,-b~$~;8. 0il & Gas Cons. commissJor~- true vertical 8884 feet Anchorage Casing Length Size Cemented MD TVD Structural Conductor 110' 20" 8 cu yds concrete 110' 110' Surface 2672' 13-3/8" 3720 cuft Arcticset II 2700' 2700' Intermediate Production 9742' 9-5/8" 1335 cuft 'G', 130 cuft Arcticset I 9770' 8719' Liner 552' 7" 375 cu ft Class 'G' 9823' 8769' CT Sidetrack Liner 1965' 2-7/8" Uncemented 9101' - 11066' 8118' - 8933' Perforation depth: measured 11020'-11030';11031'-11041' U ~ t true vertical 8933' - 8933', 8933' - 8933' 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Chris Brown, 564-5582 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Dan Stone ~~.--. "¢'-~ ~ Title Engineering Supervisor Date (/'~ tr~ Commission Use Only I ] Approval Date ~:~I See cover letter Permit Number APl Number ~/ o---o ~ II ~1 50-029-20633-02 '~ ~//O ~' for other requirements Conditions of Approval: Samples Required []Yes [] No Mud Log Required []Yes [~ No Hydrogen Sulfide Measures [~.Yes []No Directional Survey Required [~.Yes []No RequiredWorking0[-~/~¢f,.,o~ru4~,,~y []2M; [--13M; ~5M; []10M; []15M Other: David W. Johnston by order of Approved By Commissioner the commission Date/"/[-./'-~",~ Form 10-401 Rev. 12-01-85 Submit In Triplicate Well Name: [R-18b [ EHST Sidetrack Summary I Type of Well: IPr°ducer I Surface Location: 1875' FSL, 3613' FEL, S32, T12N, R13E, UM Target Location: 4288' FSL, 2357' FEL, S32, T12N, R13E, UM Bottom Hole Location: 1013' FSL, 4690' FEL, S28, T12N, R13E, UM ]AFE Number: 14P0987 I I Estimated Start Date: 17/20/98 I ling: [Nabors 2ES I Operating days to complete: 1 30 IMD: 113,367, I [TVD: ]8,840' ss I I KB Elev. 149.13' I [Well Design: [HST Sidetrack Objective: R-18b is proposed as a horizontal sidetrack, production well. The sidetrack will provide pattern expansion well replacement of R-17 and additional production from the new R-18b location. Formation Tops K/O THRZ TKingak TJF TJE TJD TJC TJB TJA TSag TSHU Formation Markers TSAD 9632' TD 13367' 8840' TZ3 NR 8953' HOT NR 8990' MD TVD (ss) 6495' 5837' 7681' 6943' 8333' 7565' 8582' 7802' 8789' 8000' 8967' 8170' 9208' 8400' 9334' 8520' 9428' 8610' 9497' 8700' 9538' 8750' 8825' Directional [KOP: 6495' MD Maximum Hole Angle: 99° through targets Rig Move Close Approaches: None Drilling Close Approaches: R-17, 86.25' separation at 11670' R-17a, 139' separation at 11710' R- 18a, 7' separation at 6600' R-23a, 163' separation at 13193' Casing/Tubing . rogram Hole Size Tubular Wt/Ft Grade Conn' Length Top Btm O.D. MD/TVDss MD/TVDss 8-1/2" 7" 26# L80 BTC-Mod 3157' 6345'/5722' 9502'/8680' 6" 4-1/2" 12.6# 13Cr80 NSCT 2011' 9346'/8531' 11357'/8888' 6" 4-1/2" 12.6# 13Cr80 Slotted NSCT 2010' 11357'/8888' 13367'/8840' Note that this will be a Banzai liner completion, with solid up to 11357', and slotted pipe thereafter NA I 4-1/2" 12.6# 13Cr80 NSCT 9320' 26'/-23' 9346'/8531' Mud Program Milling Interval: 6% KC1 Milling fluid Density, pp§ I Funnel Vis, sec [ YPI pHI HPHT FL, cc 10.0-10.2 45 - 60 20-30 8.5 - 9.0 <15 Hazards/Concerns Maintain YP 45 - 60 to insure adequate removal of metal cuttings. Ensure adequate preparation to eliminate metal entering motor and MWD from mud bypassing solids control equipment. Intermediate (8-1/2" hole) Section: 6% KC1 fluid from milling interval Density, ppg Funnel Vis, sec LSR pH HPHT FL YP 10.0 - 10.2 45 - 60 7 - 12 8.5 - 9.0 < 15 cc Hazards/Concerns I Be alert for lost circulation, differential sticking due to higher MW. Production (6" hole) Section: 6% Quickdriln (viscosified SW) i nn .ws, II p. 8.6 - 8.9 40 - 60 > 35,000 8.5 - 9.0 NC Hazards/Concerns Potential high torque could require lubricant use. If so, employ Lubetex Be alert for lost circulation, differential sticking due to overbalanced MW. Maximize solids control to keep fluid as clean as possible. Max mud weight 8.9 ppg. Cement Calculations Lead Cement Tail Cement Casing/Liner Sk / Wt / Yield Sk / Wt / Yield Comments 7" N/A 584/15.8/1.14 Class G; Tail FW=0; 50% excess; Pump time=4+hrs; TOC 200' above TOL. 4-1/2" N/A 232/15.7 / 1.19 Class G: 40% excess; Pump time = 4 hr.; TOC 200' above TOL. Banzai cement job at 11357' Volume assumptions: Gauge hole + designated excess; 80' shoe joints; TOC as designated. Open Hole Logs: 8-1/2" Hole 6" Hole Logging Program MWD Dir/GR MWD Dir/GR/4 phase resistivity DPC platform Express w/Sonic None Cased Hole Logs: R18A KB. ELEV 49.03' WELLHEAD: McEVOY w = BF. ELEV --20.81' ACTUATOR: OTIS '"~ --E: i m SSSV LANDING NIPPLE 0 ( OTIS)( 4,652' ID) DV :2642'-- [] [] 13 3/8", 72 #/fi, ~ ~,~ k GAS LIFT MANDRELS L-80, BTRS '~-"'J"' (OTIS W/RA LATCH) Na MD(BKB) TVDs$ 6 3015' 2965' I MAX*,GLE: 420 ~ 5700' I 4 I 6038' 6187' 3 I 8180' 7242' 2 8754' 7758' r 51/2', 17#/fl, L-80~ i 8902' 7890' ]lJ4S TUBING (IPC) . TUBING ID: 4.892" i CAPACITY: .0232 BBL/FT]1]1 I OTISTYpESLIDING, xA. (4.562"SLEEVEID) | [~ I FL4S FLUSH JT, 6.16 #/FT, I ~ 9-5/8" BOT PACKER i CAP = 0,00579 BBL/FT ~ ( 3H ) (4.750'1D) ......... · -- 5 1/2', 17 #/ft, L-80 BTRS TAILPIPE TOP OF 2 7/8" LINER AT g,101 FT ~ 51/2" 'X"NIPPLE I BKB, LINER IS SETTING ON ( OTIS ) ( 4.562" ID) ' '-'~ ..... BTM. 51/2' 'XN' NIPPLE I NOT CEMENTED· 4" OD ENTRY ( OTIS ) (4,455" ID) I ~.~'1 GUIDE, [3.12" ID] TOPOF 19253'l ~ll B 51/2"TBGTAILWLEG 7' LINER (ELMD) 9 5/8", 47#/,, ~ .i Ik .... L-80, BTRS PERFORATION SUMMARY II I REF LOG: SWS-BHCS- 9-5-,..~-~.__ I ITD=I,,0~'I SIZE SPF INTERVAL OPEN/SQZ'D ~ NOTE. CTD SIDETRACK: 3.75'HOLE ~ ..... DRILLED TOll,066 FT BKB, 3 1/8"4 9808- 9834' SQZD/8-4-91 / FLOAT COLLAR AT 11,032 FT BKB 9834' CMNT PLUG ~ Top of cement plug at 9834 ELMD-11/14/95 3 1/8'4 9834- 9878' SQZD/8-4-91~] Milled window between 9806 and 9810' 3 3/8'6 9922- 9952' SQZD11-15-95 ~1 MD 11117195 · 4 9952- 9968' SQZD/8-4-91~11 Whip~t~k eet at 9803 ELMD-11116/95 ' 4 9976-10022' SQZD/8-4-91 · 6 1003~-10042' S~ZD~-.-91 CTD~. ,DET4 ~ACK10100.1PERFOR^T0130 ON SUMMAR~ ~_~-- MARKER JO,NT I 10,066'1 ~ IBP SET AT 9973' ON 4-1-90'. 2' 4 10330-10360 2" 4 10670-10700 ~ (FN AT 9967'- CAPPED W/SCALE & 2" 4 11020-11030 SAND) 2' 4 11031-11041 ~ NOTE: THIS IBP WAS FOUND TO BE AT ~ 10,088' CORR WLM ON 7-28-91. (12' OF ~ PRONG & FULL RUBBER ELEMENT WAS PBTD [ 10.5--':~'~ 7', 26 #/~, L-80, I 10 IJ4S ' DATE REV. BY COMMENTS PRLIDHOE BAY UNIT 9-9-81 INITIAL d(3MPLI:TI~N ,WELL: R-18 A (34-29-12-13~ 1-6-~5 RWn 12/30/g~ RRW CTD HORIZ SIDETRACK. ~ 7/8" LINER APl NO: 60-029- 20633 1/14/96 PJO ADD PERF ~I=C 32: TN 12N: RGE 13E 1/22/96 PPA Add Pads BP Exploration (Alaska) GAS LIFT MANDRELS ( OTIS W/RA LATCH) N~ MD(BKB) TVDss 6 3015' 2965' 5 5220' 4877' 4 6938' 6187' 3 8180' 7242' 2 8754' 7756' 1 8902' 7890' TREE: 6' McEvoy R-18a (Pre-rig Status)ORIGNIALKB' ELEV = 49.13'KB, WELLHEAD: McEvoy - --' ' ELEV = 49.03' / BF. ELEV = 20.81' ---- 6,SPPG DIESEL ~ SSSV LANDING NIPPLE @ 2167' ~ 8.$PPG SEAWATER 5 1/2 FT  ~TUBING CHEMICAL CUT @ +/-7000'  ~ TOP OF CEMENT @ +/-8000' ~!~ ~ SLIDING SLEEVE @ 8972' ~?i?. TUBING SEAL ASSY. ~ 9 5/8" BOT 3H PACKER,  ~4.75" ID @ 9055' 27~8 CT LINER @ 9101 ~ ~ 51/2' XNIPPLE, 4.562' ID @ 9105' FL4S, 2.372' ID~~;?~ ~5 1/2" XN NIPPLE, 4.455" ID @ 9153' 5 1/2', 17#/It, L-80, BTRS ~~L:~'~ ~TUBING TAIL WLEG @ 9196' TAILPIPE 7' [.,NEE 'rD. ~ 9~)53' g 5/8", 47#/fl, ~ j L-80, BTRS @ 9770' eezed perforations from 10100'- / 1~11041' ~ x Squeezed perforations from 9808'- j10042' -- IBPSET AT 9073' PBTD @ 10560' ~ 7', 264f, L-80 TD @ 10625' '~ ~ DATE REV. BY COMMENTS PFIUDHOE BAY UNIT 6-8-98 CJB Pre-ri~ Status APl NO: SO-O2a-20633-01 BP Exploration (Alaska) TREE: 6' McEvoy R-18b EHST (Proposed) Ks. ELEV= 49.13' WELLHEAD: McEvoy ORIGNIAL KB. '~1 ~ r-- ELEV=49.03' ! ~ ~ ~ SSSVLANDING NIPPLE e 22~' DIESEL FREEZE PROTECTION AT / ~ / ( B~-O~flD = 4.~2' ID~ - -; .... 'I ~ I'~ ~ Dv PACKER e 2S42' 133/8', 72~, el ~ 5 1/2", 17~/fl, NSCT, 13Cr~0, ~ ~ ~8.5PPG SEAWATER o.os~' ~0 / ~ ~ 7' LINER HANGER PRODUCTION / ~~~ I PACKER ~-9240' CEMENT PLUG FROM ~90'- ~ ~ ~ / e93~' 4-1~' 12 6~ 13Cr~u 6~5. KICK OFF e6495' ~ ~ ~ ' ' ' TOP OF CEMENT ~ +/-~' ~ ~ I ISOLATION PACKER ~ ~ I ~-~357' SLIDING SLEEVE e ~72' ~ ~ ~ 8-1/2" TD e 95~' /~ v~ ~ ~ I ........... 4-1/2" 12 6~ ' ...... ' ~ ~ .-~/2' ~ wo, ~Cr~0 ~S~T ASSYJ ~ TAILPIPE~ -9~0' SLOTTED LINER TUBING SEAL ~ g031' ~ ~ . ~ ~ 9 5/8" ~T3H PACKER, 2-7/8' CT LINER ~ 9101' ~ ~ ~ 5 1/2' XNIPPLE, 4.562" ID ~ 9105' ~~~':':~''~~ ~5 1/2" XN NIPPLE, 4.456" ID 51~' 17~/, L-~ BTRS ~ ~-,~ TAILPI'PE ' ' ~ ~ ~TUBINGTAILWLEGe9196' [-80, ~1~0 ~ 0~0' ~ x Squ~z~ ~rf~ations from 9~8'- -- IBP SET AT 9973' PBTD ~ 10~0' TD ~ 1~25' ~ ........... 7'.' 2~. 'L~0 DATE REV. BY COMMENTS PRUDHOE BAY UNIT 6-8-98 CJB Pr~ S~s APl NO: ~0~2~2~33~2 BP Exploration (Alaska) Anad£i~l Schlumberger A~a~ka District 1ltl Eaa~ 80~h Avenue Anchorage, AK 99518 (907} ]49-451L Fax 344-2160 DIRECTIONAL WEL/~ PLAN for SHARED SERVICES DRILLING Well ......... : R-laB (PS) Field ........ : Prucihoe Bay, R Pad Con%pu~at£on..: MinicmJxn Curvature Units ........ : FEET Sorface L~t.,: 70.34875947 ~ Surface Long,: 148.90162790 W LOCAT£ONS - A/~SK3k Z~Dne; 4 Legal Description X-Coord Y-Coord Surface ...... : 1873 FSL 3613 FEb 532 T[2~ R13R UM Tie-in survey: 3636 FSL 3315 FE~ S32 TI2N R[3R UM Target Start,: 4288 FSL 2357 FEL S32 T12N Ri3H 194 RHL .......... : 10k3 FSL 4690,F~L S28 T12N RI3E L D4 635292.00 5978355.00 635552.64 5980122-90 636495,87 639400.00 ~982850.O0 STATION IOhNTIP[CATION T~-rN SURVEY TOP ~Op CURV~ 8/n00 M~ASURED X NCLN DE PTK ANGLE 6400.13 39.80 6495.00 39,20 6500.00 39,~7 6600.00 32,~4 6700,00 25.60 6800,00 20.06 ~ 8/100 CURVE 6866.98 17,40 ~XDP SAG RIVER 9496.55 17.40 7" CSG PT <11> 9501.79 17.40 TOP SHUBLXK 9538.47 17.40 DIRECTION m&~:~mmm: 17,20 k7,20 17.20 33.39 48,41 62.96 62.96 62.96 6~.96 V1{RTXCA3~-D~PTHS 8~CT[ON TVD St;D-SEA DEPART 5813.36 576~.23 £235,65 5886.57 5837.44 ~282,89 5890.44 5841,3~ 1~85,36 5971.68 59~2.55 6059.25 60[0.12 1375.37 6151,46 6102.33 1412.44 6214,91 6]65.7% 1433,~9 8724.£3 8675.00 21£3.88 87~9.i3 8680,00 ~2L5.44 8~64.~3 87i5.00 2226.32 C'J RVE 30/100 9565.75 17,40 6~,96 8790.17 874~.04 2234,41 Prepared ..... : 16 Apr 1998 Vert sect az.:, ~5.68' KB elevation.~ ~9.£5 ft Masnetic Dcl~: +28.039 ScaLe Pactor.:' 0.999920'79' Convergence..: ~1.03441406 CK)ORDxNAT~s-PaOM 1763.04 N 29~,54 18~0.69 N 3L0.39 [823,71 N 311,3~ 1878.3~ N 331.4l 19~O.76 N 354.05 ANADRILL AKA-DPC FEASIBILITY PLAN NOT APPROVED FOR" EXECUTION ·. PLAN # s'--c ,ALASKA ZoDe 4' TOOL DL/ X Y ,' FACE 100 635552.64' 5980122.90 LS <TfE 635~69,~4 5980180,85 .LS 0.63 635570.32 5980L83.89 LS~R''- 0,63 635589.42 5980238.83 149R 8.00 635611.30 5980281.68 140R 8.00 1950,23 N 378,81 E 635635.52 598031L.59 126R 6,00 L962,42 N ~96,34 E 6356~2,82 59803~4.10 ~L9 8,00 2519,92 N 1096.82 E 636346,68 598069~,16 ~S 0.00 2320.64 1{ 1~98,~2 E 636348.06 5980694,90 }~ 0.O0 2325,62 N 1107.99 E 636357.7~ 5980700.06 ~S 0.00 2329.33 N 1115.26 E 636364.94 5980703.90 81 0.00 (;tnadrL[L (c)9a RLaBP5 ~.2C 4:49 PM P) CD STATION MEASU'RED TOP ~AD 9~32.47 9700.00 BASE ZONE 4 9731.26 FJfD 30/100 CURVE 978].51 £NCMq An~3LE 27 37.32 57.54 66.90 82,57 PROPOSED W]3LL PRDFIhE DIRECTION ~SRTICAL-DEP'FH~ AZIMlfi'7{ TVD SUB-SEA S9.78 8821.76 8?72.63 58.29 8849.13 8800.00 56.62 8894.58 8845,45 56,10 8909,13 8860.00 55.37 8922.85 8633.72 CURVE 7/i00 9832,08 82.57 55.37 8929.13 9900,00 67.32 ' 55.54 8935,~2 10000.00 94.31 55.79 8933.70 E2TD 7/100 CU~V~ i0023.46 95,95 ~5.85 8931.60 CURVE 7/100 L0336.46 9~.95 55.85 ~899.13 10400,00 91.52 10500.00 8'4,55 10576.83 79,20 ~0842.93 79.~0 10900,00 83.06 CURVE 7/100 11000.00 89.83' ~L£00.00 96.6'0 t£108,64 97.19 ~1335,15 97-19 31400.00 9~.72 Em3 7/100 CURVE CURVE 7/t00 11500.00 85.82 11523.94 84.17 1~841,29 84.17 ~1900,00 88.0~ 12000.00 94,59 END 7/100 CURVE CURVE. 7/lOO END 7/]00 CURVE 12033.34 96.78 CURVE 7/100 i2358.79 96.78 32400,00 94.09 (Anad'£ill (c)98 RISBP5 3.2C 4:49 PM P] 56.26 8894,99 56.90 8898.41 57.40 8909.26 57.40 8959.13 56.36 8967,93 54,59 52.81 52.65 52.65 53,4% SECTION DEPART' 2247.44 ~264.82 2314.~7' 2341.~9 239~,15 8880.00 2~40,31 8885.99 2507.94 888'4.5? 2607.87 8882.47. 2631.24 8850,00 . ~942,54 884'5.86 .3005.93 8849.28 3L05.80 8860.13 318~.80 ~910.00 3~43.07 8918 80 3499.44 ,, 8974.~2 8924.99 3599.18 8968,~1 8919,383698,90 8967,48 8918,35 3707.47 8939.13 8890.00 3931.88 8933,53 8884.40 3996.41 54.64 · 8934.81 8885,68 4096.30 54.93 8936.90 8887.77 4120,~4 5~.93 8969,13 8920.00 4435.83 56.36 8973.13 8924.00 4494.38 58,79 8970.85 8921.72 4594.~4 59.60 8967,54 8918,4l 4627.36 59.60 8929,13 8880.00 4949.77 58.55 8925.23 8876.10 4990.72 16 Apr [998 pac3e 2 COORD~NAT~S-~ROM 2335.67 N 1126.71 2344,65 N L141.62 2371.37 }l 1183,25 2386.67 ~{ 9414.98 N ALASKA Zone 4 Y 636~76.27 5980710.45 63639~.01 5980719.~0 636432.16 59807¢7.95 1206.25 E 6~6~54.87 5980762.87 1247,77 ~ .636¢95,88 5980791~92 2442.35 N ~28~,40 24'80.90 N 1343.11 2537.06 N 1425.63 2550,19 N 2724.9~ N 2760.32 N 2835.33 N 2856,58 N 2997.41N 3028.23.~ 3084',75 N 2252.0~,E 3143.82 N 2'332,43 31~9.02 ~ 2339.26 3285.34 ~ 25~7.92 3324.17 ~ 2569.53 TOOL DL/ PAC~ 5L 50,00 4L 30.00 31 30.0O 31 30,00 MS 30.00 636535.00'59B0820.00 2R .0.00 636590,00 5980859.35 2R 7.00 6'36671.48 5980917.~8 2R 7,00 1444.96 E 6'36690,57 ~980930.66 ~S 7.00 1702,60 E '636945,00 5983110.0'0 2.75R 0,00 17~$.~9'~ 636996.94 598114~.34'. 175R ~.00 L63B.S6 H 637079.29 S98'1202.'84 1902.43 ~ 637142.40 '598L245.23 2122,62 E 637~60,..00 5981390.00 ~169.84 ~ '637406.65 5981421'.65 637487.79 5981479,66 637967.12 5981540.17 , , 6375'73.85 5981545.48 637750.00 5981685.00 637800.90 $981724.75 175R 7.00 HS 7.00 lsb o.Oo L5L 7,00 151 7,00 LSL 7.00 MS 7.00 L70R 0.00 170R 7,00 3382.85 )l 2650.42 E 637880.71 5981784.88 3396.60 N 2669,90 ~ 637899,94 5981798.98 3578,00 N 2928.30 E 638L55;00 598£985.00 3611.0~ N 9976,64 E 638902,74 ~982018.91 3664.62 N 3060.98 E 638286.08 59820?3.'99 170R 7,00 HS 7.00 20R 0.00 20R 7.00 20R 7.00 3681,61 N 3089.47 E 6383L4.27 5982091.49 HE 7.00 3845.3,3 N 3368.23 H 638590.00 5982260.00 159L 0.00 3866.21 N 34-0.3-,4i.-E-....6~.&24 n.n 5qn3a~,l_'~ ~,~. '~ nn iLL. AKA-DPC FE:,'A iBi LITY PLAN NOT APPROVED FOP, EXECUTION "0 STATION IDENTIFICATION END $/100 CURVg CURVE 7/t00 MEASURED £NCLN DEPTH ANGLE 12500.00 87.57 125~.81 85.75 12848.39 85.75 12900.00 89.34 13000.00 96,29 E2{D 7/100 CURV]~ £]041.O6 99.14 TD 13367.~1 99.14 PROPOSED WEb6 PROFfLE D~RHCTION ~HRTICAL-DEPTHS SECTION AZIMUTH TVD SUB -SEA -DEPART 56.O1 8923-78 8874.65 5090.61 55.30 8925.40 8876.27 5i~8.37 55.30 8949,%3 8900.00 5438.06 54.85 895i.%¢ 8902.21 5489.6f 53.99 8946.43 ~fl97.30 ~589.41 53.63 8940.93 8891.80 .5630.07 53.63 8889.13 8840.00 ~9Sl,87 Apr 1998 ..Pa~e. ) COORDINATES-~ROM ~ELLREA.I~ 3920.22 ~ 3487.48 3935.89 N 35i0.41 ~31~.8~ N 3793.25 4147.)9'~ 4~05.47.N · ALASKA Zone 4 TOOL DL/ K ¥ FACE 100 638707.87 ~982337.~3 159L 7.00 63873D~51 5982353.30 HS 7.00 638990.00 5982540.00 'TL 0.~0 381~.52 E 639031.7.3 5982570.27 75 7.00 3a96.70 ~ 6391l[.84 5982629.79 7L 7.00 4229.49 N 3929.53 E 4420..45 N 4168.81 E 639144'.23'5982654.40 6%9400.00 5982850.00 , 7 .00 0,00 FEASIBILITY PLAN NOT A'PPROVED FOR EXECUTION PLAN 3> Z. -O C) (Anadril[ (c)90 BLEEP5 3,2C 4:49 PM P) 04/~6/1998 16'54 907-344-' ~ ANADRZLL DPC PAGE 85 " ' SHARED SER zcEs D'RZLLTNG' ' 'PS ' ~- " I ! n-ioo ~00-~ ........... I.q fil_eC,,~n at: 55.68 . . ~oo~ z~D~ILL~ AKA-)~Cl Ioep s~a~e~~_~oo feet . -[:EAS Btl_ITY [,~FI'- ~~ ,oo:- _ NOT/tPPROVE~~ FC)R [ ~ . E:,(EC[JTIC ' : ' ~nadrj]] Schlumberger ' '_'~' - NaPier Identification NB BKB SECTN ~N~H .~ ........... I A) TIE-IN SURVEY 6400 58~3 ~2)g ~ ..... -. - ~.. B) TOP 0F HINfl0~ 6495 5887 ~283 39.80 . g) K0P ~VE 8/~00 6~00 5890 t285 39.~7 00 .... .. .0) ENO ~/t00 ~RVE 6867 62~5 ~434 t7.~0 _ -' E] 7" CSG PT 41> 950~ B729 2215 . . F)-CURVE 30/~00 9~66 B790 223~ 17.J0 ', G) ENO 30/100 CURVE 978~ B923 239~ ~2.57 }0 ~ " H) CURVE 7/t00 9832 89a9 2440 82.57 ~ [) ~g 7/t00 CURVE 10023 B~32 263~ 95.95 ' d) CURVE 7/~00 10336 8899 2943 95.9~ )0-- ~ ..... KI ENO 7/~00 CURVE ~0577 Bg09 3~82 79,80 ~, L) CURVE 7/100 10843 8959 3443 79.20 ~ M) END 7/~00 CURVE 11t09 8967 3707 97. % -NI CURVE 7/100 t1335 8939 3932 97. )0 , O) END 7/~00 CURVE lt524 8937 4120 84.17 '% P) CURVE 7/~00 11841 8969 4436 84.I7 ', " O) END 7/~00 CURVE 12033 8968 4627 96.78 , ',4_ R] CURVE 7/~00 ~2359 8~9 4950 96 78 ,, S) END 7/~00 CURVE t25~8 8925 5~t8 85.75 , ' T) CURVE 7/tO0 ~2848 8949 5438 85.75 o ~-~, u] ENO ~/too CURV~ ~04~ .~4~ 56~0 ' V) fD ~3367 ' 8889 5952 99.t4 , ~ _j . . , ~ . ,. , ~ · . , 0 600 i200 i800 2400 3000 3600 4200 4800 5400 6000 6500 7200 7800 Sect ion Oeparture ~ SHA"R'EO' SERV'TCE. S , i i ii, BBTLL,TNG ,'.. ,,', I' ' .tlnadr,i ]] S£h]umberger ii i i i i ii R- SB (PS) VERTTCAL SECTION VIEW 8000 8200 SectiOn at: 55'.68 ..... ...... --------,~'-Z-~-I I TVO Scale.' 1 inch.= 20'0 feet ',,, Oep Scale.: .~ inch .= 200 feet - ~, AN~ DRILL AKA-EhP~ ~ lOrawn .....: lB Apr 1998 ', FEAS'BILI TY FLAb, * ---~' '~ ~ , Narker Identification MD BKB SECTN INCL~ I ) *~ ' .... ~_ _~ C) END 30/300 ¢gRVE 9784 8923 239~ 82.5; *t L~ ~ ~ ~. .... k' E). END 7/tO0 CURVE ' "tO0~3 B932 883~ 95.9~ .............. ~~ ..... F) CURVE 7/~00 '.' ~0336 BBC9 2943 95.g~ ~ 6)' END 7/~00 CURVE 30577 8909 3~82 )' ~ ' . , , ', , ~ H) CURVE 7/100 · &0843 8959 3443 79.81 ~ ' ,, I) E~ 7/100 CURVE t~O9 8967 3707 97. J) CURVE 7/~00 11335 8939 3938 97. }' ', K) END 7/100 CURVE $t5~4 . 8B37 ' L) CURVE 7/iQ0' 1~84t 8~9 4436 84 ~ , ~ N) END 7/]00 C~VE t2033 896B 4627 96.7 ~ N) C~VE 7/~00 t~359 8989 4~0 96.7  ~ D} END 7/tO0 CURVE ~28 8925 5t~8 65.7 ~ . P) CURVE 7/~00 ~B48. 8949 5438 85,7 ~ ~) ENO 7/~00 C~VE ~304t . 894~ 5630 ' 99.t4 .... ~ ................. { ...................... T~f {,~ ~ i .... ~ H ' ,,- I,, 2000 2100 2~0 2300 2400 2500 ~00 2700 ~800 2~0 3000 3tO0 3200 3300 3400 3500 3600 3700 3800 Sect ion Depa~tupe ....... m z l> H ITl ANAtJh~ILL DFC PAGE 87 SHARED-SI.-RVIO'bS DR'I'ELING Marker Identification A) TIE-IN SURVEY 6400 1763 8) TOP OF WINOOW 6495 182! N 310 C) KOP CURVE 8/100 6500 D) END 8/100 CURVE 6367 1962 N 396 E) 7' CS6 PT <Il> 9502 2321N i098 E F) CURVE 30/100 9566 2329 N ~115 E G) ENO 30/JO0 CURVE 9784 2415 N 1248 E H) CURVE 7/t00 9832 2442 N- 1287 E I) END 7/100 CURVE 10023 8550 N t445 E J) CURVE 7/100 10336 '2725 N 1703 E K) END 7/100 CURVE 10577 2857 N 1902 E .L) CURVE 7/100 10843 2997 N 2123 E N) END 7/100 CURVE 11109 3J49 N -' 2339 E N) CURVE 7/~00 - ~1335 3285 N 25J6 E O) END 7/JO0 CURVE 11524' 3397 N 2670 E p) 341 3578 N 2928 E R-18B (PS) PLAN VIEW CLOSURE ..... : 6090 feet at Azimuth 43.46 DECLINATION' +2F~. 039 SCALE' ' 1 inch -- 800 feet DRAWN · ~6 Apr 1998 . ! · _ · /nadrJY] Schlumberger ! CU.VE ~oo { ~2: 3 - 368 ~ -. CURVE 7~100 12t ~8 4118. N- ,773 E / f' . k OT A, pP! OV F' . ~ ~ ............ .=~~ ..... m - . .............. n ~nn ~nn~ 3200 3600 4000 4400 4800 520 400 0 400 800 1200 1600 2 <- WEST ' EAST -> ..--=---- ALASKA OIL ,~.ND GAS CONSERVATION COMMleSION APPLlt ..... /ION FOR SUNDRY APPRO~,..~.. 1. Type of Request: ~ Abandon ~ Suspend F%~] Plugging ~Time Extension ~ Perforate .,r-] Alter Casing ~ Repair Well ~_j Pull Tubing ~ Variance ~ Other i ~ Change Approved Program ~ Operation Shutdown ~ Re-Enter Suspended Well 1--~ Stimulate Plug Back for Sidetrack 2. Name of Operator i BP Exploration (Alaska)Inc. i3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3405' SNL, 3613' WEL, SEC. 32, T12N, R13E, UM At top of productive interval 5236' SNL, 2828' WEL, SEC. 29, T12N, R13E, UM At effective depth 820' NSL, 2158' WEL, SEC. 29, T12N, R13E, UM At total depth 856' NSL, 2151' WEL, SEC. 29, T12N, R13E, UM 5. Type of well: i~ Development ~_~ Exploratory [~ Stratigraphic []Service 6. Datum Elevation (DF or KB) KBE: 49.03' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number R-18A 9. Permit Number 95-128 ~10. APl Number 50-029-20633-01 i11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool i 12. Present well condition summary Total depth: measured 11066 feet true vertical 8885 feet Effective depth: measured 11034 feet true vertical 8884 feet Casing Length Size Structural Conductor 110' 20" Surface 2672' 13-3/8" Intermediate Production 9742' 9-5/8" Liner 552' 7" CT Sidetrack Liner 1965' 2-7/8" Plugs (measured) Junk (measured) ~.~ ! ! ?'h ~ ~ ,.~=~ ~ ~ Cemented MD TVD 8 cu yds concrete 110' 110' 3720 cuft Arcticset II 2700' 2700' 1335 cuft 'G', 130 cuft Arcticset I 9770' 8719' 375 cuft Class 'G' 9823' 8769' Uncemented 9101' - 11066' 8118' - 8933' Perforation depth: measured 11020' - 11030'; 11031' - 11041' true vertical 8933' - 8933', 8933' - 8933' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 to 9055' with 5-1/2" tailpipe to 9196' Packers and SSSV (type and measured depth) 9-5/8" BOT packer at 9055" 5-1/2" SSSV (nipple) at 2167' 13. Attachments [~ Description summary of proposal [] Detailed operations program ~ BOP sketch 14. Estimated date for commencing operation June 16,1998 16. If proposal was verbally approved Name of al)prover Contact Engineer Name/Number: Chris Brown, 564-5582 Date approved 15. Status of well classifications as: ,~ Oil ~ Gas .,~ Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Dan Stone ~,.-- ~ ~ Title En. gineering Supervisor Commission Use Only Conditions of Approval: Notify Commission so representative may witness Date I Approval No. ~.~.~:~_/~u~ Plug integrity_ Mechanical Integrity Test __ Approved by order of the Commission BOP Test Location clearance Subsequent form required 10- Commissioner Date Form 10-403 Rev. 06/15/88 Submit In Triplicate H136087 VENDOR DATE '~----'8 I CHECK NO' :27/ 00i 3608'7 & A~.AST ~i. 4 O0 NET DATE HANDL INVOICE ,, CREDIT MEMO DESCRIPTION TERRI H~BBLE GROSS I00.00 x 4628 DISCOUNT i00.00 H 'HE A'rFACHED CHECK IS IN PAYMENT FOR ri'EMS · WELL PERMIT CHECKLIST COMPANY ~,"~b ~) ~ WELL NAME ~P/12 ~ ~ - 1 ~ [~ PROGRAM: exp [] dev ~ redrll,,~ serv [] wellbore seg [I ann. disposal para req I] FIELD & POOL INIT CLASS ~ ~ ~ - 0 II...- GEOL AREA ~ ~ ~ UNIT# 1/ ~o ~' ~ ON/OFF SHORE O//% ADMINISTRATION 1. --2. 3. 4. 5. 6. 7. 11. TE _ 13. Permit fee attached ....................... Lease number appropriate ................... Unique well name and number ................... Well located in a defined pool..'¢' ............. .... Well located proper distance from drilling unit boundary.'~ . . . Well located proper distance from other wells.%'. ....... Sufficient acreage available in drilling unit..~ .......... If deviated, is wellbore plat included ............... Operator only affected party ................... Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can be issued without administrative approval ...... Can permit be approved before 15-day wait ........... ENGINEERING APPR DATE 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to ,,5'O~C) psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... N N GEOLOGY )A-m-~LAR D I~~'L N N (~ N SN N N N (~)N N 29. Is presence of H2S gas probable ................. 30. Permit can be issued w/o hydrogen sulfide measures~.._.~-'-~""~ Y N 31. Data presented on potential overpressu~ ..... Y N 32. Seismic analysis of shallo~ ............ Y N 33. Seabed condition~.u.,:~e'y~'f off-shore) ............. Y N 34. C~ogress reports ....... Y N plora~ory omy] 35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... Y N (B)will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N ENGINEERING: UlC/Annular BEW~ ~'/(Z'(~J~ WM JDH / COMMISSION: DWJ ~ RNC CO C~ Comments/Instructions: M:chel~list rev 05/29/98 dlf: C:\msoffice\wordian\diana\checM ist Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history_ file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER . ....... SCHLUMBERGER ....... . COMPANY NAME : BP EXPLORATION (ALASKA) WELL NAME : R-18B FIELD NAME : PRUDHOE BAY BOROUGH - NORTH SLOPE STATE : ALASKA API NUMBER : 500292063302 REFERENCE NO : 98624 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-I999 10:26 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 99/01/22 ORIGIN : FLIC REEL NAME · 98624 CONTINUATION # : PREVIOUS REEL : CO~k4ENT : BP EXPLORATION, R-18B, PRUDHOE BAY, API #50-029-20633-02 **** TAPE HEADER **** SERVICE NAME : EDIT DATE · 99/01/22 ORIGIN : FLIC TAPE NAME · 98624 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT · BP EXPLORATION, R-18B, PRUDHOE BAY, API #50-029-20633-02 TAPE HEADER PRUDHOE BAY MWDIM~D LOGS WELL NAME: API NUMBER: OPE~TOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING R-18B 500292063302 BP EXPLORATION (ALASKA) SCHLUMBERGER WELL SERVICES 22-JAN-99 BIT RUN 1 98624 NUTTER RUSSELL BIT RUN 2 BIT RUN 3 32 12N !3E 49.13 47.73 20.81 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 7.000 9539.0 6.000 4.500 13280.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 3RD STRING 6.000 PRODUCTION STRING REMARKS: CONTAINED HEREIN IS THE LDWG FORMATTED LWD IMPULSE DATA AQUIRED ON BP EXPLORATION'S R-18B WELL. DEPTH SHIFTING IS WAIVED PER STEVE JONES VIA DAVE DOUGLAS. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SUNk4ARY LDWG TOOL CODE START DEPTH STOP DEPTH MWD 13279.0 6450.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE LDWG TOOL CODE $ REMARKS: .......... EQUIVALENT UNSHIFTED DEPTH .......... ....... BIT RUN NO. MERGE TOP MERGE BASE 1 6450.0 9486.0 2 9486.0 9680.0 3 9680.0 11710.0 4 11710.0 11754.0 5 11754.0 12198.0 6 12198.0 13222.0 THIS FILE CONTAINES THE EDITED IMPULSE DATA. THE ROP AND GR CURVES ARE INTERPOLATED FROM 6450 TO 9496. THE CURVES ARE MERGED AT THE DEPTHS SHOWN ABOVE. THE CURVES ARE CLIPPED AT FIRST READING AND AT LAST READING. LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 19 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NE¢4~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 4000273 O0 000 O0 0 1 1 1 4 68 0000000000 FET MPtD HR 4000273 O0 000 O0 0 1 t 1 4 68 0000000000 ROP MWD FPHR 4000273 O0 000 O0 0 1 1 1 4 68 0000000000 GR M~qD GAPI 4000273 O0 000 O0 0 1 t 1 4 68 0000000000 RPD i~qD OH~ff44000273 O0 000 O0 0 1 ! 1 4 68 0000000000 RPM MWD OH~M4000273 O0 000 O0 0 1 1 1 4 68 0000000000 RPS MWD OH~k4 4000273 O0 000 O0 0 1 1 ! 4 68 0000000000 RPX MP~ OH~ff4 4000273 O0 000 O0 0 1 1 1 4 68 0000000000 RPXXMWD Otf~l 4000273 O0 000 O0 0 1 1 1 4 68 0000000000 RAD MWD OHIOI 4000273 O0 000 O0 0 1 1 1 4 68 0000000000 RAM MWD OHI¢~f4000273 O0 000 O0 .0 1 1 1 4 68 0000000000 RAS MWD OHIOI 4000273 O0 000 O0 0 1 1 1 4 68 0000000000 RAX MWD 0H~43I4000273 O0 000 O0 0 1 1 i 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: DEPT. 13279.000 FET.MWD 3.388 ROP.MWD 10.101 GR.MWD RPD.MWD -999.250 RPM.I~WD -999.250 RPS.MWD -999.250 RPX.MWD RPY~X.MWD -999.250 RAD.I~WD -999.250 RJkM.MWD -999.250 RAS.MWD RAX.MWD -999.250 DEPT. 6450.000 FET.MWD -999.250 ROP.I~WD -999.250 GR.MWD RPD.MWD -999.250 RPM.MWD -999.250 RPS.MWD -999.250 RPX.MWD RPXX.MWD -999.250 RAD.MWD -999.250 RAM. MWD -999.250 ~S.MWD RAX.MP[D -999.250 -999.250 -999.250 -999.250 50.540 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION ' O01CO1 DATE : 99/01/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/22 MA~YREC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NYJMBER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE SU~mlARY VENDOR TOOL CODE START DEPTH STOP DEPTH M~WD 9540.0 6405.0 $ LOG HEADER DATA DATE LOGGED: 13-AUG-98 SOFTWARE: SURFACE SOFTWARE VERSION: 5 1Ai2 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 5 1BIO _ REAL- TIME 13280.0 6405.0 13280.0 16.3 39.8 TOOL STRING (TOP TOBOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAIV~VA RAY IMP IMPULSE RESISTIVITY $ TOOL NUMBER MWD IOA _ IMPULSE- 475 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : DRILLERS CASING DEPTH (FT) : 8.500 9539.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OkIlVi~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): 6~ KCL 10.00 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS: **************** RUN1 ******************** ********* 8.5 in hole section ************ Depth interval from 6495 to 9542 ft. Ideal software version 5 la 12 MiO s/n 276 software version 5 lblO _ Sensor offsets from bit: Survey - 58.05 ft Gamma Ray - 56.06 ft Data transmitted in real time only. Gamma ray corrected for hole size and mud weight. **************** RUN2 ******************* *********** 6 in hole section ************ Depth interval from 9560 to 9720 ft LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 9542 to 9560 drilled with no MWD. Ideal software version 5 la 12 IMPulse s/n 052 software version 5.0x53 Sensor offsets from bit: Survey - 32.15 ft Gamma Ray - 34.32 ft Resistivity - 26.95 Et Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. **************** RUN3 ******************* *********** 6 in hole section ************ Depth interval from 9720 to 11777 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 52.01 ft Gamma Ray - 54.18 ft Resistivity - 46.81 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 9530 to 9580 ft. MAD pass from 6250 to 6500 ft. *********** 6 in hole section Depth interval from 11777 to 11840 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 52.94 ft Gamma Ray - 55.11 ft Resistivity - 47.74 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. No resistivity data aquired for run. Will MAD pass this section next run. *********** 6 in hole section Depth interval from 11840 to 12405 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 53.24 ft Gamma Ray - 55.41 ft Resistivity - 48.04 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 11773 to 11840 ft. Data loss from 12252 to 12405. Files were overwritten in surface system. LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: **************** RUN 6 ******************* *********** 6 in hole section ************ Depth interval from 12405 to 13280 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 53.24 ft Gamma Ray - 55.41 ft Resistivity - 48.04 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 12252 to 12405 ft. THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 20 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 4000273 O0 000 O0 0 2 1 1 4 68 0000000000 GRRW LW1 GAPI 4000273 O0 000 O0 0 2 1 1 4 68 0000000000 ROP5 LW1 F/HR 4000273 O0 000 O0 0 2 1 i 4 68 0000000000 TVDE LW1 FT 4000273 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-!999 10:26 PAGE: NAME SERV UNIT SERVICE API API API API FILE NTIMB ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) GRIN LW1 GAPI 4000273 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 9540.000 GRRW. LW1 -999.250 ROPS.LW1 24.230 TVDE.LW1 GRIN. LW1 -999.250 DEPT. 6405.000 GRIN. LW1 -999.250 GRRW. LW1 -999.250 ROP5.LW1 -999.250 TVDE.LW1 8770.990 5817.130 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE ·FLIC VERSION ·O01CO1 DATE : 99/01/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE Nt~4BER 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SUR~4ARY VE~OR TOOL CODE START DEPTH STOP DEPTH ~CD 9508.5 9720.0 $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: LOG HEADER DATA DATE LOGGED: SOF~gARE : SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME) TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAF~A RAY IMP IMPULSE RESISTIVITY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) '. MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~I) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN): EWR FREQUENCY (HZ): RE'LARKS: 13 -AUG-98 5 1Al2 5 lB10 _ REAL- TIME 13280.0 6405.0 13280.0 22.0 95.8 TOOL NUMBER ........... MWD i OA IMPULSE- 475 6. 000 9539. 0 QUIKDRLN 8.60 20000 **************** RUN1 ******************** ********* 8.5 in hole section ************ Depth interval from 6495 to 9542 ft. Ideal software version 5 la 12 MiO s/n 276 software version 5 lblO _ Sensor offsets from bit: Survey - 58.05 ft Gamma Ray - 56.06 ft LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 10 Data transmitted in real time only. Gamma ray corrected for hole size and mud weight. **************** RUN2 ******************* *********** 6 in hole section ************ Depth interval from 9560 to 9720 ft 9542 to 9560 drilled with no MWD. Ideal software version 5 la 12 IMPulse s/n 052 software version 5.0x53 Sensor offsets from bit: Survey - 32.15 ft Gamma Ray - 34.32 ft Resistivity - 26.95 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. **************** RUN3 ******************* *********** 6 in hole section ************ Depth interval from 9720 to 11777 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 52.01 ft Gamma Ray - 54.18 ft Resistivity - 46.81 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 9530 to 9580 ft. MAD pass from 6250 to 6500 ft. **************** RUN4 ******************* *********** 6 in hole section ************ Depth interval from 11777 to 11840 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 Sensor offsets from bit: Survey - 52.94 ft Gamma Ray - 55.11 ft Resistivity - 47.74 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. No resistivity data aquired for run. Will MAD pass this section next run. *********** 6 in hole section ************ Depth interval from 11840 to 12405 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 53.24 ft Gamma Ray - 55.41 ft Resistivity - 48.04 ft IAB - 1.0 ft LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 11 Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 11773 to 11840 ft. Data loss from 12252 to 12405. Files were overwritten in surface system. **************** RUN 6 ******************* *********** 6 in hole section Depth interval from 12405 to 13280 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 53.24 ft Gamma Ray - 55.41 ft Resistivity- 48.04 ft IAB - t.0 ft Data from tool recorded memory. Gamma ray corrected for hole size a_ud mud weight. MAD pass from 12252 to 12405 ft. THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 4 66 255 $ 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 14 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 12 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 4000273 TVDE LW2 FT 4000273 ROP5 LW2 F/HR 4000273 MTEM LW2 DEGF 4000273 TABR LW2 S 4000273 AIOH LW2 OHMM 4000273 A16H LW2 OH~ff44000273 A22H LW2 OH~M 4000273 A28H LW2 OH~4M 4000273 A31H LW2 OHI~M 4000273 A34H LW2 OH~ff44000273 PiOH LW2 OIff~44000273 P16H LW2 OHMM 4000273 P22H LW2 OH~f 4000273 P28H LW2 0H~94 4000273 P31H LW2 OH~ff44000273 P34H LW2 OHF~4 4000273 GR LW2 GAPI 4000273 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 9508.500 TVDE.LW2 8771.293 ROPS.LW2 -999.250 MTEM. LW2 TABR. LW2 0. 000 AiOH.LW2 O. 100 A16H. LW2 300. 000 A22H.LW2 A28H. LW2 300.000 A31H.LW2 300.000 A34H. LW2 300.000 PlOH.LW2 P16H. LW2 0.257 P22H. LW2 0.300 P28H.LW2 0.247 P31H. LW2 P34H. LW2 1000 . 000 GR. LW2 74 . 936 DEPT. 9720. 000 TVDE. LW2 8899. 951 ROPS. LW2 127. 654 MTEM. LW2 TABR. LW2 3440 . 000 AiOH.LW2 5. 622 A16H. LW2 300. 000 A22H.LW2 A28H. LW2 300.000 A31H.LW2 83.879 A34H.LW2 28.183 PIOH.LW2 P16H.LW2 16.957 P22H.LW2 19.622 P28H.LW2 23.396 P31H.LW2 P34H. LW2 26. 598 GR. LW2 76. 206 221.735 300.000 1000.000 1000.000 224.998 300.000 15.651 24.971 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION · O0tCO1 DATE : 99/01/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 13 **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE I~JMBER 4 RAW MWD Curves and log header data for each bit run in separate files, BIT RUN NUMBER: 3 DEPTH INCREMENT: O. 5000 FILE S~Y VENDOR TOOL CODE START DEPTH STOP DEPTH 9656.0 11777.0 LOG HEADER DATA DATE LOGGED: 13-AUG-98 SOFTWARE: SURFACE SOFTWARE VERSION: 5 1Al2 _ DOWN-HOLE SOFTWARE VERSION: 5 1BiO _ DATA TYPE (MEMORY or REAL-TIME): REAL-TIME TD DRILLER (FT) : 13280.0 TOP LOG INTERVAL (FT) : 6405. 0 BOTTOM LOG INTERVAL (FT) : 13280. 0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMI]M ANGLE: 81.0 MAXIMUM ANGLE: 99.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY IMP IMPULSE RESISTIVITY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: TOOL ~FU?4BER MWD IOA IMPULSE-475 6. 000 9539.0 QUIKDRLN 8.70 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 14 MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~k~) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS: ********* 8.5 in hole section ************ Depth interval from 6495 to 9542 ft. Ideal software version 5 la 12 MiO s/n 276 software version 5 lblO _ Sensor offsets from bit: Survey - 58.05 ft Gamma Ray - 56.06 ft Data transmitted in real time only. Gamma ray corrected for hole size and mud weight. **************** RUN2 *********** 6 in hole section ************ Depth interval from 9560 to 9720 ft 9542 to 9560 drilled with no MWD. Ideal software version 5 la 12 IMPulse s/n 052 software version 5.0x53 Sensor offsets from bit: Survey - 32.15 ft Gamma Ray - 34.32 ft Resistivity - 26.95 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. *********** 6 in hole section ************ Depth interval from 9720 to 11777 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 52.01 ft Gamma Ray - 54.18 ft Resistivity - 46.81 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 9530 to 9580 ft. MAD pass from 6250 to 6500 ft. *********** 6 in hole section ************ LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 15 Depth interval from 11777 to 11840 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 52.94 ft Gamma Ray - 55.11 ft Resistivity - 47.74 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. No resistivity data aquired for run. Will MAD pass this section next run. *********** 6 in hole section ************ Depth interval from 11840 to 12405 ft Ideal software version 5 la 12 IMPulse s/n 015 software version $.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 53.24 ft Gamma Ray - 55.41 ft Resistivity - 48.04 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 11773 to 11840 ft. Data loss from 12252 to 12405. Files were overwritten in surface system. **************** RUN 6 ******************* *********** 6 in hole section ************ Depth interval from 12405 to 13280 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 53.24 ft Gamma Ray - 55.41 ft Resistivity - 48.04 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 12252 to 12405 ft. THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #3. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 16 ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 14 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 * * SET TYPE - CHAN * * NAME SERV UNIT SERVICE API API API API FILE NUMB NYIMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HEX) DEPT FT 4000273 TVDE LW3 FT 4000273 ROP$ LW3 F/HR 4000273 MTEM LW3 DEGF 4000273 TABR LW3 S 4000273 AIOH LW3 OHF~4 4000273 A16H LW3 OIHV~l4000273 A22H LW3 OHNk4 4000273 A28H LW3 OH~ff44000273 A31H LW3 OHMM 4000273 A34H LW3 OHMM 4000273 PIOH LW3 OHN~4 4000273 P16H LW3 OHM~f 4000273 P22H LW3 OHNff44000273 P28H LW3 OH~fl~4000273 P31H LW3 OHMM 4000273 P34H LW3 OHi~k44000273 GR LW3 GAPI 4000273 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 1 ! 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 ! 1 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 ! 1 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 17 DEPT. 9656. 000 TVDE. LW3 TABR. LW3 O. 000 A1 OH. LW3 A28H. LW3 113.391 A31H.LW3 P16H. LW3 133 . 212 P22H. LW3 P34H. LW3 118.946 GR. LW3 DEPT. 11777. 000 TVDE. LW3 TABR. LW3 3100. 000 AiOH.LW3 A28H. LW3 4. 602 A31H. LW3 P16H. LW3 4. 931 P22H. LW3 P34H. LW3 5. 213 GR. LW3 8891. 393 ROP5. LW3 27. 417 A16H. LW3 90. 898 A34H. LW3 157. 671 P28H. LW3 211.132 8962. 467 ROPS. LW3 4. 598 A16H. LW3 4 . 545 A34H. LW3 5. 031 P28H. LW3 23. 409 -999. 250 ~Fft~4. LW3 61 . 396 A22H. LW3 80. 332 PIOH. LW3 140. 595 P31H. LW3 58. 665 MTEM. LW3 4.618 A22H. LW3 4.493 P1 OH. LW3 5.121 P31H. LW3 197.985 130.543 88.665 128.183 225.000 4.647 4.808 5.167 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE ' FLIC VERSION : O01CO1 DATE : 99/01/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION · O01CO1 DATE : 99/01/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: O. 5000 FILE SU~94ARY VENDOR TOOL CODE START DEPTH STOP DEPTH MWD 11680.5 11840.0 $ LOG HEADER DATA DATE LOGGED: 13-AUG-98 SOF~qARE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 18 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 5 1Al2 _ 5 !BiO _ REAL-TIME 13280.0 6405.0 13280.0 81.0 99.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAF~4A RAY IMP IMPULSE RESISTIVITY $ TOOL NUMBER MWD iOA _ IMPULSE-475 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 6.000 9539.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHb94) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): QUIKDRLN 8.80 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS: ********* 8.5 in hole section ************ Depth interval from 6495 to 9542 ft. Ideal software version 5 la 12 MiO s/n 276 software version 5 iblO _ Sensor offsets from bit: Survey - 58.05 ft Gamma Ray - 56.06 ft Data transmitted in real time only. Gamma ray corrected for hole size and mud weight. **************** RUN2 ******************* *********** 6 in hole section ************ LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-!999 10..26 PAGE: 19 Depth interval from 9560 to 9720 ft 9542 to 9560 drilled with no MWD. Ideal software version 5 la 12 IMPulse s/n 052 software version 5.0x53 Sensor offsets from bit: Survey - 32.15 ft Gamma Ray- 34.32 ft Resistivity - 26.95 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. **************** RUN3 ******************* *********** 6 in hole section ************ Depth interval from 9720 to 11777 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 52.01 ft Gamma Ray - 54.18 ft Resistivity - 46.81 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 9530 to 9580 ft. MAD pass from 6250 to 6500 ft. **************** RUN4 ******************* *********** 6 in hole section ************ Depth interval from 11777 to 11840 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 52.94 ft Gamma Ray - 55.11 ft Resistivity - 47.74 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. No resistivity data aquired for run. Will MAD pass this section next run. *********** 6 in hole section ************ Depth interval from 11840 to 12405 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5. Oa 26 _ Sensor offsets from bit: Survey - 53.24 ft Gamma Ray - 55.41 ft Resistivity - 48.04 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. FL4Dpass from 11773 to 11840 ft. Data loss from 12252 to 12405. Files were overwritten LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 2O in surface system. **************** RUN 6 *********** 6 in hole section ************ Depth interval from 12405 to 13280 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 53.24 ft Gamma Ray ~ 55.41 ft Resistivity - 48.04 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 12252 to 12405 ft. THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #4. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 4 66 255 $ 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 14 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CUSS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 4000273 O0 000 O0 0 5 1 1 4 68 0000000000 TVDE LW4 FT 4000273 O0 000 O0 0 5 i 1 4 68 0000000000 ROP5 LW4 F/HR 4000273 O0 000 O0 0 5 t 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 21 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) MTEMLW4 DEGF 4000273 O0 000 O0 0 5 1 1 4 68 0000000000 TABR LW4 S 4000273 O0 000 O0 0 5 ! 1 4 68 0000000000 AIOH LW4 Otff4M4000273 O0 000 O0 0 5 1 1 4 68 0000000000 A16H LW4 0HM~I4000273 O0 000 O0 0 5 1 1 4 68 0000000000 A22H LW4 OH~4M4000273 O0 000 O0 0 5 1 1 4 68 0000000000 A28H LW4 OH~4M4000273 O0 000 O0 0 $ 1 1 4 68 0000000000 A31H LW4 0H1~44000273 O0 000 O0 0 5 1 1 4 68 0000000000 A34H LW4 0HM~4000273 O0 000 O0 0 5 1 1 4 68 0000000000 PiOH LW4 OH~M4000273 O0 000 O0 0 5 1 1 4 68 0000000000 P16H LW4 OH~4M4000273 O0 000 O0 0 5 1 1 4 68 0000000000 P22H LW4 OH~4M4000273 O0 000 O0 0 5 i 1 4 68 0000000000 P28H LW4 0Iff4~4000273 O0 000 O0 0 5 1 1 4 68 0000000000 P31H LW4 OHMM4000273 O0 000 O0 0 5 1 1 4 68 0000000000 P34H LW4 0I~4M4000273 O0 000 O0 0 5 1 1 4 68 0000000000 GR LW4 GAPI 4000273 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 11680.500 TVDE.LW4 8957.109 ROPS.LW4 -999.250 MTEM. LW4 TABR.LW4 O. 000 AIOH.LW4 O. 143 A16H.LW4 O. 100 A22H.LW4 A28H.LW4 0.100 A31H.LW4 0.100 A34H. LW4 0.100 PiOH.LW4 P16H. LW4 0.179 P22H.LW4 0.191 P28H. LW4 0.148 P31H. LW4 P34H. LW4 1. 000 GR. LW4 20. 359 DEPT. 11840.000 TVDE.LW4 8970.543 ROPS.LW4 51.429 MTEM. LW4 TABR.LW4 3749. 984 AiOH.LW4 O. 406 A16H.LW4 300. 000 A22H. LW4 A28H.LW4 300. 000 A31H.LW4 4. 484 A34H. LW4 O. 644 PiOH. LW4 P16H.LW4 0.193 P22H.LW4 0.300 P28H. LW4 0.197 P31H.LW4 P3 4H. LW4 1000. 000 GR. LW4 31. 540 222.979 0.100 0.160 0.117 225.000 300.000 1000.000 4.749 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 22 **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION · O01CO1 DATE : 99/01/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW M~qD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: 0.5000 FILE SUPmLARY VENDOR TOOL CODE START DEPTH STOP DEPTH 11717.5 12404.5 LOG HEADER DATA DATE LOGGED: 13 -AUG- 98 SOFTWARE: SURFACE SOFTWARE VERSION: 5 1Al2 _ DOWNHOLE SOFTWARE VERSION: 5 1BiO _ DATA TYPE (MEMORY or REAL- TIME): REAL- TIME TD DRILLER (FT) : 13280.0 TOP LOG INTERVAL (FT) : 6405.0 BOTTOM LOG INTERVAL (FT): 13280.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: 81.0 MAXIMUM ANGLE: 99.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~IA RAY IMP IMPULSE RESISTIVITY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: TOOL NUMBER ~ iOA _ IMPULSE-475 6.000 9539.0 QUIKDRLN 8.80 LIS Tape Verification Listing Schlumberger Alaska Computing Center '. r 25-JAN-1999 10:26 PAGE: 23 MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHbff4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE '. MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 R~KS: **************** RUN1 ******************** ********* 8.5 in hole section ************ Depth interval from 6495 to 9542 ft. Ideal software version 5 la 12 MiO s/n 276 software version 5 lblO _ Sensor offsets from bit: Survey - 58.05 ft Gamma Ray - 56.06 ft Data transmitted in real time only. · Gamma ray corrected for hole size and mud weight. **************** RUN2 ******************* *********** 6 in hole section ************ Depth interval from 9560 to 9720 ft 9542 to 9560 drilled with no MWD. Ideal software version 5 la 12 IMPulse s/n 052 software version 5.0x53 Sensor offsets from bit: Survey - 32.15 ft Gamma Ray - 34.32 ft Resistivity - 26.95 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. **************** RUN3 ******************* *********** 6 in hole section Depth interval from 9720 to 11777 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a_26 Sensor offsets from bit: Survey - 52.01 ft Gamma Ray - 54.18 ft Resistivity - 46.81 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 9530 to 9580 ft. ~lADpass from 6250 to 6500 ft. **************** RUN4 ******************* *********** 6 in hole section ************ LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 24 Depth interval from 11777 to 11840 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5. Oa 26 _ Sensor offsets from bit: Survey- 52.94 ft Gamma Ray- 55.11 ft Resistivity- 47.74 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. No resistivity data aquired for run. Will MAD pass this section next run. **************** RUN 5 ******************* *********** 6 in hole section ************ Depth interval from 11840 to 12405 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5. Oa 26 _ Sensor offsets from bit: Survey - 53.24 ft Gamma Ray - 55.41 ft Resistivity- 48.04 ft IAB - 1.0 f t Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 11773 to 11840 ft. Data loss from 12252 to 12405. Files were overwritten in surface system. *********** 6 in hole section ************ Depth interval from 12405 to 13280 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5. Oa 26 _ Sensor offsets from bit: Survey - 53.24 ft Gamma Ray- 55.41 ft Resistivity- 48.04 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 12252 to 12405 ft. THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #5. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 25 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 14 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE DEPT FT 4000273 O0 000 O0 0 6 1 1 4 68 0000000000 TVDE LW5 FT 4000273 O0 000 O0 0 6 1 1 4 68 0000000000 ROP$ LW5 F/HR 4000273 O0 000 O0 0 6 1 1 4 68 0000000000 MTEML~ DEGF 4000273 O0 000 O0 0 6 1 1 4 68 0000000000 TABR L~ S 4000273 O0 000 O0 0 6 1 1 4 68 0000000000 AiOH LW5 0H~44000273 O0 000 O0 0 6 1 1 4 68 0000000000 A16H LW5 0HH~4000273 O0 000 O0 0 6 1 1 4 68 0000000000 A22H LW5 0H~44000273 O0 000 O0 0 6 1 1 4 68 0000000000 A28H LW5 0h74~4000273 O0 000 O0 0 6 1 1 4 68 0000000000 A31H LW5 OHNJ~4000273 O0 000 O0 0 6 1 1 4 68 0000000000 A34H LW$ OH~M4000273 O0 000 O0 0 6 1 1 4 68 0000000000 PiOH L~ 0H~I4000273 O0 000 O0 0 6 1 1 4 68 0000000000 P16H LW5 0H~4000273 O0 000 O0 0 6 1 1 4 68 0000000000 P22H LW5 0HNI~4000273 O0 000 O0 0 6 1 1 4 68 0000000000 P28H L[~ OHl~ff4000273 O0 000 O0 0 6 1 1 4 68 0000000000 P31H LW$ OP~dIff4000273 O0 000 O0 0 6 1 1 4 68 0000000000 P34H LW5 0H~4~4000273 O0 000 O0 0 6 1 1 4 68 0000000000 GR LW5 GAPI 4000273 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 26 DEPT. 11717. 500 TVDE. LW5 TABR. LW5 0. 000 AiOH.LW5 A28H. LW5 4.640 A31H. LW5 P16H. LW5 3.807 P22H. LW5 P34H. LW5 5.030 GR. LW5 DEPT. 12404. 500 TVDE. LW5 TABR. LW5 20869. 984 AiOH.LW5 A28H. LW5 300. 000 A31H. LW5 P16H. LW5 9.534 P22H.LW5 P34H. LW5 32.809 GR. LW5 8962. 301 ROP5. LW5 4.278 A16H. LW5 4 . 597 A34H. LW5 4 . 375 P28H. LW5 24. 331 8911. 775 ROPS. LW5 300. 000 A16H. LW5 300. 000 A34H. LW5 16. 062 P28H. LW5 27. 385 178.210 ITTEM. LW5 4. 498 A22H. LW5 4. 558 P1 OH. LW5 4. 761 P31H. LW5 72. 012 MTE~. LW5 300. 000 A22H. LW5 300. 000 PiOH. LW5 25. 350 P31H. LW5 216.687 4.633 3.210 4.894 224.994 300.000 6.093 28.872 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE · FLIC VERSION : O01CO1 DATE : 99/01/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 99/01/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: O. 5000 FILE S UNfl~R Y VENDOR TOOL CODE START DEPTH STOP DEPTH ~D 12187.5 13279.5 $ LOG HEADER DATA DATE LOGGED: 13-AUG-98 SOF~gARE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 27 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 5 1Al2 _ 5 lB10 _ REAL- TIME 13280.0 6405.0 13280.0 83.0 98.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY IMP IMPULSE RESISTIVITY $ TOOL NUMBER MWD iOA _ IMPULSE-475 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : 6. 000 9539.0 BOREHOLE CONDITIONS MIlD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OH~k4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TE~IPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): QUIKDRLN 8.80 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20000 REMARKS: ********* 8.5 in hole section ************ Depth interval from 6495 to 9542 ft. Ideal software version 5 la 12 MiO s/n 276 software version 5 lblO _ Sensor offsets from bit: Survey - 58.05 ft Gamma Ray - 56.06 ft Data transmitted in real time only. Gamma ray corrected for hole size and mud weight. **************** RUN2 ******************* *********** 6 in hole section ************ LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE 28 Depth interval from 9560 to 9720 ft 9542 to 9560 drilled with no MWD. Ideal software version 5 la 12 IMPulse s/n 052 software version 5.0x53 Sensor offsets from bit: Survey - 32.15 ft Gamma Ray - 34.32 ft Resistivity - 26.95 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. **************** RUN 3 ******************* *********** 6 in hole section Depth interval from 9720 to 11777 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey- 52. O1 ft Gamma Ray - 54.18 ft Resistivity- 46.81 ft IAB - 1.0 f t Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 9530 to 9580 ft. MAD pass from 6250 to 6500 ft. **************** RUN 4 ******************* *********** 6 in hole section ************ Depth interval from 11777 to 11840 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5. Oa 26 Sensor offsets from bit: Survey - 52.94 ft Gamma Ray - 55.11 ft Resistivity- 47.74 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. No resistivity data aquired for run. Will FLeD pass this section next run. **************** RUN 5 ******************* *********** 6 in hole section Depth interval from 11840 to 12405 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 _ Sensor offsets from bit: Survey - 53.24 ft Gamma Ray - 55.41 ft Resistivity- 48.04 ft IAB ~ 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 11773 to 11840 ft. Data loss from 12252 to 12405. Files were overwritten LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 29 in surface system. **************** RUN6 ******************* *********** 6 in hole section ************ Depth interval from 12405 to 13280 ft Ideal software version 5 la 12 IMPulse s/n 015 software version 5.0x53 IAB s/n ENP 009 software version 5.0a 26 Sensor offsets from bit: Survey - 53.24 ft Gamma Ray - 55.41 ft Resistivity - 48.04 ft IAB - 1.0 ft Data from tool recorded memory. Gamma ray corrected for hole size and mud weight. MAD pass from 12252 to 12405 ft. THIS FILE CONTAINS THE RAW DATA FOR BIT RUN #6. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 4 66 255 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 14 12 68 13 66 0 14 65 FT 15 66 68 16 66 i 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NTIM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NO~B SAMP ELEM CODE (HEX) DEPT FT 4000273 O0 000 O0 0 7 1 1 4 68 0000000000 TVDE LW6 FT 4000273 O0 000 O0 0 7 1 1 4 68 0000000000 ROP5 LW6 F/HR 4000273 O0 000 O0 0 7 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 3O NAME SERV UNIT SERVICE API API API API FILE NtItBB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) MTEMLW6 DEGF 4000273 O0 000 O0 0 7 1 1 4 68 0000000000 TABR LW6 S 4000273 O0 000 O0 0 7 1 1 4 68 0000000000 AiOH LW6 014~4M4000273 O0 000 O0 0 7 1 1 4 68 0000000000 A16H LW6 OH14M4000273 O0 000 O0 0 7 1 1 4 68 0000000000 A22H LW6 0H~144000273 O0 000 O0 0 7 1 1 4 68 0000000000 A28H LW6 OHPk44000273 O0 000 O0 0 7 1 1 4 68 0000000000 A31H LW6 OH~gq4000273 O0 000 O0 0 7 1 1 4 68 0000000000 A34H LW6 OHP~ff4000273 O0 000 O0 0 7 1 1 4 68 0000000000 PiOH LW6 Otff4M4000273 O0 000 O0 0 7 1 1 4 68 0000000000 P16H LW6 OY3V~q4000273 O0 000 O0 0 7 1 1 4 68 0000000000 P22H LW6 OHMM4000273 O0 000 O0 0 7 1 1 4 68 0000000000 P28H LW6 0H~4000273 O0 000 O0 0 7 1 1 4 68 0000000000 P31H LW6 OHIqM4000273 O0 000 O0 0 7 1 1 4 68 0000000000 P34H LW6 0t~4M4000273 O0 000 O0 0 7 1 1 4 68 0000000000 GR LW6 GAPI 4000273 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 12187.500 TVDE.LW6 8937.783 ROP5.LW6 359.920 MTE~.LW6 TABR.LW6 0.000 AiOH.LW6 6.775 A16H.LW6 7.137 A22H.LW6 A28H.LW6 7.415 A31H. LW6 7.273 A34H.LW6 7.153 PiOH.LW6 P16H.LW6 6.741 P22H. LW6 7.583 P28H.LW6 8.032 P31H. LW6 P34H.LW6 8.205 GR.LW6 22.828 DEPT. 13279.500 TVDE.LW6 8906.867 ROPS.LW6 10.321 MTEM. LW6 TABR.LW6 12199.984 AiOH. LW6 300.000 A16H.LW6 300.000 A22H.LW6 A28H.LW6 300.000 A31H.LW6 300.000 A34H.LW6 300.000 PIOH.LW6 P16H.LW6 1000.000 P22H.LW6 9.207 P28H.LW6 8.380 P31H.LW6 P34H. LW6 15.139 GR.LW6 35.040 162.185 7.444 5.755 8.119 169.996 300.000 1000.000 11.049 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE · FLIC VERSION · O01CO1 DATE : 99/01/22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-JAN-1999 10:26 PAGE: 31 **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 99/01/22 ORIGIN : FLIC TAPE NAME : 98624 CONTINUATION # : 1 PREVIOUS TAPE : CO~4ENT '. BP EXPLORATION, R-18B, PRUDHOE BAY, API #50-029-20633-02 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 99/01/22 ORIGIN : FLIC REEL NAME : 98624 CONTINUATION # : PREVIOUS REEL : CO~4ENT · BP EXPLORATION, R-18B, PRUDHOE BAY, API #50-029-20633-02