Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
216-163
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU F-22A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 216-163 50-029-21951-01-00 11830 Conductor Surface Intermediate Liner Liner 9083 80 2654 9209 651 2958 10900 20" 13-3/8" 9-5/8" 5-1/2" 3-1/2" x 3-1/4" x 2-7/8" 8978 31 - 111 31 - 2685 29 - 9238 8995 - 9646 8872 - 11830 31 - 111 31 - 2685 29 - 8658 8459 - 8979 8355 - 9083 None 2260 4760 6820 10530 10900, 11725 5020 6870 7740 10160 10740 - 11784 4-1/2" 12.6# 13cr85 25 - 8951 9031 - 9059 Structural 4-1/2" AHC Packer 8816, 8307 8816 8307 Torin Roschinger Operations Manager Kirsty Glasheen kirsty.glasheen@hilcorp.com 907-564-5258 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028277, 0028280 25 - 8422 N/A N/A 202 92 21223 2289 3849 343 1371 1376 1049 193 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 10:02 am, Jan 10, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2024.01.10 05:51:52 -09'00' Torin Roschinger (4662) DSR-1/26/24 RBDMS JSB 011124 WCB 2024-06-24 ACTIVITY DATE SUMMARY 12/26/2023 SLB CTU #9 - 1.75" CT - 0.156WT. Job Scope: Jewelry Log, Set CIBP, Add Perf. MIRU. Function test BOPs. MU & RIH w/ HES GR/CCL Jewelry Logging BHA & 2.25" Nozzle. Log up from 11,050' to 10,450' CTMD. Paint White tie-in flag @ Elec = 10600.8 / Mech = 10,558 / DTR = 10,600.74. POOH. At surface, BD HES logging BHA. MU & RIH w/ NS 2 7/8" Plug set BHA. ***Job Continued to 12/27/23 *** 12/27/2023 SLB CTU #9 - 1.75" CT - 0.156WT. Job Scope: Jewelry Log, Set CIBP, Add Perf. RIH with NS 2 7/8" CIBP BHA. Correct Depth to Flag. Set Top of Plug @ 10900'. PT Plug and LL to 1515 psi. Good Test. 3/8" Ball Recovered. PT MHA to 3500 psi. RIH with a 2" HES 20' MaxForce perf gun, 6 SPF, 60 deg Phase. Shoot holes at 10740' - 10760'. No change in returns after holes shot. FP tubing w/40 bbls diesel. Well Control Drill and Muster Drill w/Crew. LD Spent Gun. Ball Recovered. Change Packoffs / Check Chains. RDMO. ***Job Completed *** Daily Report of Well Operations PBU F-22A CIBP and adperfs are correctly shown on the new WBS, below. -WCB Shoot holes at 10740' - 10760'. RIH with NS 2 7/8" CIBP BHA. Correct Depth to Flag. Set Top of Plug @ 10900'. PT Plug and LL to 1515 psi. Good Test. S E �LASKAOILANDG ST CON ERVA ION COMMIS(' RECEIVED REPORT OF SUNDRY WELL OPERATIONS NOV 0 2017 1. Operations Performed Abandon 0 Plug Perforations RI Fracture Stimulate 0 Pull Tubing 0 Operations shutdown ❑ Suspend 0 Perforate B Other Stimulate 0 Alter Casing 0 ChaA tt , -• -r-Ga ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: Set CIBP II 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 216-163 3. Address: P.O.Box 196612 Anchorage, Development M Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21951-01-00 7. Property Designation(Lease Number): ADL 0028280 8. Well Name and Number: PBU F-22A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11,Present Well Condition Summary: Total Depth: measured 11830 feet Plugs measured 11725 feet true vertical 9083 feet Junk measured feet Effective Depth: measured 11725 feet Packer measured 8817 feet true vertical 9030 feet Packer true vertical 8308 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 79 20"Conductor 31 -111 31-111 Surface 2654 13-3/8"68#L-80 31-2685 31 -2685 5020 2260 Intermediate 9209 9-5/8"47#L-80 28-9238 28-8658 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 11651-11671 feet 11696-11706 feet 11753-11784 feet True vertical depth: 8993-9003 feet feet 9016-9021 feet 9044-9059 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr85 26-8953 26-8423 Packers and SSSV(type,measured and 4-1/2"AHC Packer 8817 8308 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 2256 2052 1013 199 Subsequent to operation: 196 2719 2302 1305 220 14.Attachments:(required per 20 AAc 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development ® Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil II Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Haffener,Jordan Contact Name: Haffener,Jordan Authorized Title: Production Engineer Contact Email: Jordan.Haffener@bp.com Authorized Signature: / Date: /r/2/z01-7 Contact Phone: +1 9075645383 Form 10-404 Revised 0417 /7i / /` 4 f;/7/ 7 RBDitfiS 07NO - 7 2017 Submit Original Only • S • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary November 1, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Cast Iron Bridge Plug and Addition of Perforations in Well F-22A, PTD # 216-163. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • • Q O O co O O (so O vs co co Lo oo v- N CO LO O N V • (fl r- co U N o 0 0 0 0 s- N d N j N z O CO I� O O Lip (o ° r- co 0 O) Cf) co 0 0 N CO 0-) co La 0) N- N- CO N CO CO 0 0 O V N co 0o oO 6) 0) CO i . i i i I I i I- Ln 0 O N CO Ln (`) O) N- (O C`') CO N C'7 t CO r- N CO CO CO CD C Cf) CO CO CO cpCNI ° C) .- CO CO N- V' N a0 L (o N N CO O 0 N O) 0) 0 CO V ml II 1 1 1 I Q N N CO N- 0)) N- N co N- CO LU N CO a0) C O N LL CO ~ aco cpo 0 0 0 0 o CO CO CO CO CO U ), 2.1 J J J J •� N o _ V O) CO Co (V CO U � � NNvco � N CO In ( N L r+ _ CO CD 0) LO O - CMO N C I— O N O Lo O) d N O) (fl op J W U W W U a u_ W W W W W Z ZWWWWW m Q J H Z_ Z_ Z_ Z_ D U (n Z J J J J f- • 0 0D Ti f + 2 0 >,$ � b » � % ƒ _ \ 0 (D0 3 0 G a R O « > 13 R \ © \y \ mc § �$ / \ H % 2 \ / 3 - 5 I 0 O 0 N- . Cl- 5 0 1 U) = 0 R ® 7 - / 0 2 Cl- I / \ -o ® Hm - . 2 - a) � \ / G \ / / / / \ .- t• E / § / 2 ,_,- _c \ o R e% _ / 3 \ 0 > / $ / \ - % < I = b $ 2 a - f - \ \ f 2 >< o / \ ± - ® � a) 3 E e = @ - E Ca t o = G n ® CV I ± C koo " C "C CV k ( CO o x s =u & '- 0 = ) 2 o = c = o E co < < , . 2c < / / » / aD E _ L > Q C 7 n a Q e § % @ c --- _ % Ct. a) 92 / \ a CO a \ R / 6 o I e / G $ b / / _ 0- D 0 2 « $ o $ _ o m % CO $ > D 0 c a / E / e * £ _ \ o E £ .. 2 =2 G _ a.y \ = 2 + \ ƒ $ 9 \ / $ 2 / \ o / % o = _ ¢ ± 2 = O 0 0 = 0 = a OH E y @ > / o [ \ E / o \ cub E % ƒ\ c o \ w / a \ Ia30 - 0 O © kC) / - w \•9 � 9- E / /4, k/ >s S ± � I .\ 0H a) a) ® \ o \ / 5 , o » 2 OE & _ D o - \ \ \ \ / \ \ 2CO § } i \/ 2/ \ \ \ / % k 0 t CO\ \ _ Ao- « @ - eE ot0@ � / aRs O / 2 0 0 O 0./ . / ® o \ O G --g. _ c $ a j \ _ N. - / \ \ j / eL / CO \ \ _a± \ / y c \ i ° ® 0 o f CO $ 0 ° $ ? -0 c / / o f = 0 \ I > ± o # _ o o 7 0 @ 3 = % H o m \ 2 E < / H o R 2 \ y 7 U m z = = t 0 I I -0 « m > t O E a t r CO 2 H w0 _ w w_ x CN ® # o C\I- 9 \ ¥ c ¥ d % / / R \ \ / 0 < TREE= illF-2 2A WELLHEAD=1:f-5/8"McEVOY SAFETY NOTES:••'4-1 f2"CHROME TBG" WELL ACTUATOR= ANGLE>70°@ 9958'. MAX DLS:25.9°@ 9796'. OKB.ELEV= 64-54' REF a.EV= 64.54' BF.ELEV= 36.15' KOP= 4800' 20"COND, 110 ' LI 2200' H4-1/2"OTIS X NP,D=3.813" Max Angle= 111°@ 10411' —#,Datum MJ= 9498' D= " Datum TVD= 8800'SS GAS LFT MANDRELS ST MD WE) DEV TYPE VLV LATCH SEE DATE 13-3/8'CSG,68#,L-80 BUTT,D=12.415" — 2685' 5 2979 2979 1 M1AG DOME RKP. 16 09/27/14 4 4981 4974 15 MG SO RK r 20 09/27/14 3 6430 6246 32 M4tG DMY RK ' 0 06/24/14 2 7630 7274 30 MAG DMY RK r 0 06/24/14 Minimum ID = 2.377" @ 10292' 1 8708 8213 29 MM3 DMY RK ' 0 06/24/14 3-1/4" X 2-7(8" XO 8786' 1—[4-1/2"OTIS X NIP,D=3.813" =, 8814' 9-5/8"X 4-1/2"AHC HYD SET PKR D=3.903' 8849' —4-1/2"OTIS X NP,D=3.813" J [TOP OF 3-1/2"X 3-1/4"X 2-7/8"LNR I—{ 8872' ] I__8872' J-L3_710"DEPLOY SLV,D=3.00"j 1 tNe L 8894' _I--,3-1/2"HES X NIPPLE,D=2.812 8920' 4-1/2"OTIS XN MP,D=3.725"(BEHIND CT LNR) 4-1/2"TBG, 12.6#,13CR-85 VAM TOP, 8949' r 8949' JH4-112"WLEG,D=3.958'J .0152 bpf,ID=3.958" °7. .v.. ..; TOP OF 5-1/2"LMT H 8995' ►44 8996_)— R�9-5/8'X 5-1/2^71W LNR HGR, =4.866" i }., '4- i 9-5/8"CSG,47# L-80 MSCC,D=8.681" 9238_ , .K. 13-1/2"LNR 9.3#,L-80 STL. .0087 bpf,ID=2.992" 9278' = 9278' 3-1/2^X 3-114"XO,ID=2.786"J L5-1/2"WHIPSTOCK(12/12/17)J—[ 9644' 9612' 5-1/2'MARKER JOINT] [5_1/2"LNR, 17#,L-80 BUTT,.0232 bpf,D=4.892" I —9644' , MILLOUT WINDOW(F-22A)9646'-9656' ll 3-114"LNR 6.6#,L-80 TC11, .0079 bpf,D=2.85" 10292' PERFORATION SUMMARY REF LOG: ON /_/___ = �" 10292' J3-1i4^X 2-718"XO,D2.377" ANGLE AT TOP PERF:60°@ 11651' �1 Note:Refer to Roduction DB for hestancai perf data SIZE SPF NTE RVAL Opn/Sqz SHOT SC)7 10679' PUP JT w/RA TAG 2" 6 11651- 11671 0 10/08/17 *44' . + =i 2" 6 11696- 11706 0 10/08/17 2" 6 11745- 11776 C 36/03/17 ., , - ". �I 11725' H2-7/8"WFT CBP(10/08/17) IIII PBTD i 11791'eT y��,17/ [2-7/8"LNR,6.5#,L-80 TCI 1, .0058 bpf,D=2.441" 11830' J ►�a DATE REV BY COMETS DATE REI/BY COMA16•fTS — PRUDFIOE BAY UPIT 08/28/89 N-18E OFROMNAL COMPLETION 10/11/17 MSS/JMO ADPERFS&SET CIBP WELL: F-22A 06/25/14 D-16 RWO _ — PERMf No: 216-163 05/25/17 N-CDR2 CTD(F-22A) AR No: 50-029-21951-01 05/30/17 JM) DRLG HO CORRECTIONS SEC 2,T11N,R13E,2096'FNL&2178'FEL 06/19/17 ZB/JMO FINAL OCE AFPROVAL 06/19/17 DLW/JM) FE RFS(06/03/17) BP Exploration(Alaska) • 0 o „ 9 WJ I W J I -O • CO Y ,- rn O \ LL I Z_ LL I Z_ E X U ~ a N Z 1\ C • Q LL Q LL O O M M _UI p o) _U a`�il o Z UI Z �1 a) aa) op co m 2 °3 N 5 m a LLI LLI (/) W Cr rn co cI ml v 0 cci ❑ > > mto 0 0 > 0 > a) a) 0 C N U Q Lca f) N 0 N LCD 7 7 j j CD N .6 CD Z Z E U o) iX I NI �I N-I N- CO CO N m a) a 3 1 o Ya n F. (/� N D 0 0 0 NN C C C C Lr) 1 '5 _ d N LO O Q @ N W � NI Q Q Q < Q Q Q Q QI QI QI C I co LL M 0 2 LLI y CO o 2 2 E 2 2.._ NNNNNNN J N ° N (n Q LL LLN LL (NC.) M M 'O N N N N N N N O LL N LL N a LL LL LL LL LL LL LL _ ❑ O �!!@ Z H a) 6 o 6 coI O) 6 01I a)UI t N InI i- a) a) a) a) a) a) 6 Q . d E 0❑1=1 ° c.)�LE LE I °SIH °�1— °S1N °�1UI o o ° 9 o v ° N ! rn ° 'EF.'„- -1m1 2 2 20 1 200 20 1 2Om o 0 0 0 0 0 0 I— < '' J V a0i N I r- _a) a)N I aai NIm 0 N101 aai N I m 0 N101 N N N N N N N W N N LU W N W N I WNW W N I WNW W W LU LU W W LU CL. > �O 0O 0O 'O o 0 0 0 0 0 0 0 0 0 11 W m d N N N N N N N N N N N N N N /�/ O N. r r N- N- r N- r N- N- r N I LL J re CO CO CO COCO CO •[� CO 0, f0 Cfl CO CO (O f0 co i� a l� W W J 2 2 U m o 0 Z 8 — i R CL cr) O ao d �a 0)a m o �, d o zI ° s T N N N N O) O N n a) E Q V T E M U m o J N 3 COO Q Q Z oa�n N ct ll N 0. �y l6 H O a) 5 z n J 2 G /y� O d W Q M cr R m 0 J J rn o y U CO o co \ iy LD ICC a ° r a °If Q Z E Z 0 0 d 0 o 0 E J m2 Z 7 2 co CO CO CO C6 CO CO CO CO C6 03 CO 06 CO N a) co a) co @ CO CO C6 co CO co CO m co m co E E ❑ ❑ ❑ 0 0 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ co 0 03 N N f6 CO CO co CO co co C6 co C6 C6 CO 0) Qt Z Q_ .0 . .0 . . .0O) m T m ) m 2' 0) ) 0) 0) ) Ca ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑C ❑ Z _ ` M > 0 Ja) d r— N- N. N- N- r- n r` N- N. N- N- N.- N- GO F— NjaCO CO CO CO CO CO CO CO CO CO CO CO CO CO CO Q Z . O a) CO 3 (N0 OND CO CCOO CNO CNO OND N N CON OND CO N W N 2 0 5 G W 0 z N N N N N N N NNNNNNN Q 0 E 0 U _� •- 0 Z— •— �O «LL co 0 re o ❑ °) in Z 2 0 U U U 0 0 0 U U U U U U U C E 5 Qw —I O d 2LIJ 0~ 3 J G I— >, ❑W W LU W LU ❑W LU ❑W W ❑W W W W ❑W • • o • - p OCV OCV OCV O • LL C V. c W JI Z Z Z Z E a N cZ O N N N N 2 2 U` Z ...J1 - 0 I I I 1 m CO p O Il J a a a I 1 J g 6 U Z_ col Q 2 2 2 2 n r Q NE. N i1 O = LL N W (n fn (n N N N p Z Z in 2 I- F LLQ LLQ Q Q - � I- o NI Z 0I a)a1 a6 a1 dl I NI I> NI Z o F. N 0 } ca cQ co< Q > Q > >' Q Q Q m it�I it a1 w1 �1 K1 I m M 2 OW N D a�� 0 0 0 c" 0 1 J il LL N LL N 15 2 N() V C.) C..) (2"? U p I I. a mZ NZ LLZ LLZ LLLL p C) gi uicn 2 mal 5a1 uia1 aial aia1 uia1 p r Z jr- I aixU1 acn pg y 0 ( EMM LE u) LLg EM W Q o 1 o I� g I- oa a) oa co oa= oa- oa oa OCL� d Y . "ca c22 0 E W. "E W. "cam- "cam c� ca E , • co Q 1 < <mQ2 <mQ2QQoI= 1 I00I00I I° ° p < ° 1 ° 1 ° 1 - 1 - 70IQ VNm N Nf� N NN N� WN IWNW N2 WNT- WN WN WN WNW WN N2 03 OQ Ur r n r r n d1 a H o 0 o o o o o o E y E W q1 N N N N N N N N a3 3 1-- O 0) O 01 D) O (/) Z Ce OJT cO c0 (D CO CO (O 0 W W -J ' 01 Co) m 9 z m V f.) Q to — O 41) Ce` N O co N O C O) J o a. C ti co o ao a) G r o coo v rn N o O y ao N a 0 E II (..) .7 o ' M U o N Q N I v N bA N — vsP. I LI. I 0. I— H _ S Z U) 2 CO • N m 0 1 c ILI O N co Cl)Vi O O N QCG O II, 0. °' 0 �3 v c N c c 0E os t@ (U .) Z V) U) N m N a3 CU N CO N lD N d 3 mIIO coO m O O O co0 O 0 m E o m m 2 f6m m 76 m m I O O) «. ... .. « ... .. .-• w m a_1 m O_I c1 m _rn O)o) OI to op 0 0 0 p p p p p 3 E I c CO > I0 CCO cno 0 0 0 0 0 0 0 c > N N N M M M M M co M - W CG I0) W a0 CO co CO co co CO CO N N N N N N N N N N d W N Q ' W .2. . con co co ' 0 0 z « - 0 0 U U U U U U U U 2 L) oI d' C7 o rn - 0LL Q a w 0 -J 0 0 0 0 W w _J 3 ? i o 0 0 N,- N ,- Clti Q 8Y O o 07 Z N E m e N D r >, co a o @ c co < b c a o o z L • O E 0 a m Q 2 m a U U co0 0 VO Z Q I y 3w y m >_ Q >- a3 — C l4 H O O � ma " o LU o ai IX ° as a LL E w K w N W m rn -I . V m O E -1 co Z u' $2h 0 o v, v, m (6 J a m J C w E O y U U a ,, o c G N a a O � E r I C.) ` U % a) o —I . E Q c £ Qto N ° V 1 t a ca I— ~ E �1 H _ CU 0 )- NO ` m I I. Q ch c a) E CO m m O H E I Ar w c O a� c - y m p c c O1 co D ICC rG • cco 1 a @ ° a� I I I "' c E Q . O as O Q C z o a ' 0 £ U 0 2 as z d r r 3 co z 1 0 0 N N C CO t0 H .� iT t0 0 Oa N c N d N coas W .` 0F " c) p w c 10 coI d . co 2 O 00 Q O 0 7i. 1 G I c U .E Q ''O O a N o E •a �O. p E o E m E a 2 0 a 0 10 o a 0 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM N WEL OMPLETION OR RECOMPLETION REPOW AND LOG la. Well Status: Oil 0 • Gas ❑ SPLUG 0 Other ❑ Abandoned 0 Suspended 0 1b.Well Class: 20AAC 25.105 20AAC 25.110 Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: One Service 0 Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 6/3/2017 - 216-163. 3. Address: 7. Date Spudded: U- 15. API Number: P.O.Box 196612 Anchorage,AK 99519-6612 54742017 511(01174- • 50-029-21951-01-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: • 5/22/2017 PBU F-22A Surface: 2095'FNL,2177'FEL,Sec.02,T11 N,R13E,UM • 9 Ref Elevations KB 64.54 17. Field/Pool(s): Top of Productive Interval: 416'FSL,2649'FEL,Sec.35,T12N,R13E,UM GL 35.95 • BF 36.15 ' PRUDHOE BAY,PRUDHOE OIL• Total Depth: 2230'FSL,2784'FEL,Sec.35,T12N,R13E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: • 11791'/9063' • ADL 028280&028277 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. DNR Approval Number: Surface:x- 652648 • y- 5974719 • Zone - ASP 4 . 11830'/9083' ' 87-035 TPI: x- 652123 y- 5977220 Zone - ASP 4 12. SSSV Depth(MD/TVD): PO Thickness of Permafrost MD/TVD: Total Depth:x- 651948 y- 5979031 Zone - ASP 4 None 2026'/2026' 5. Directional or Inclination Survey: Yes 0 (attached) No 0 13. Water Depth,if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 9646'/8979' 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD/GR/RES,GR/CCL/RPM 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH ND HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" Conductor 31' 111' 31' 111' 13-3/8" 68# L-80 31' 2685' 31' 2685' 17-1/2" 3830 cu ft Permafrost 9-5/8" 47# L-80 28' 9238' 28' 8658' 12-1/4" 2369 cuft Class'G' 5-1/2" 17# L-80 8995' 9646' 8459' 8979' 8-1/2" 479 cu ft Class'G' 3-1/2"x3-1/4" 9.3#/6.6 L-80 8872' 11830' 8355' 9083' 4-1/4" 171 sxClass'G' x2-7/8" 6.5# 24. Open to production or injection? Yes 0 No 0 • 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#13Cr85 8953' 8817'/8308' 2"Gun Diameter,6 spf 11745'-11776' 9040'-9055' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. ()PAH. ( OI\ RECEIVED Was hydraulic fracturing used during completion? Yes 0 No 0 . Per 20 AAC 25.283(i)(2)attach electronic and printed n?'(f 1 information IQ .\, ` 0 DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED ,-E rIGr\ 1)-- AOGCC 2500' Freeze Protect w/38 Bbls Diesel 27. PRODUCTION TEST Date First Production: June 20,2017 Method of Operation(Flowing,gas lift,etc.):Gas Lift Date of Test: 6/21/17 Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: 3 Test Period ....► 1 0 274 96 0 Flow Tubing 200 Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 1040 24 Hour Rate '""•"r 8 • 0 2190 N/A Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only X41 q-/7/ RBDMS 1.V JUL - 6 2017 28. CORE DATA • Conventional Core(s) Yes 0 No H • Sidewall Cores Yes 0 No l If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Permafrost-Top Well Tested? Yes 0 No H • Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 9855' 9123' separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. CGL-Zone 3 9760' 9065' Base of CGL-Zone 2 If\ 9855' 9123' Zone 3(Invert) 10729' 9035' Zone 4 10928' 8969' Zone 3(Revert) 11583' 8963' Zone 2 11709' 9022' Formation at total depth: Zone 2 11709' 9022' 31. List of Attachments: Summary of Daily Drilling Reports,Summary of Post-Rig Work,Survey,Cement Report,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka,Joseph N Contact Name: Browning,Zachary H Authorized Title: Info tion and Controller � Contact Email: Zachary.Browning@bp.com Authorized Signature: Date: (O/2_b/1 (/ Contact Phone: +1 907 564 5220 INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and ND for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only WELLHEAD=13-5/8"McEVOY • F-2 2 A SIO(y NOTES:***4-1/2"CHROME TBG*** WELL ACTUATOR= ANGLE>70°@ 9958'. MAX DLS:25.9°(9796'. OKB.ELEV= 64.54' I REF BEV= 64.54' BF.ELEV= 36.15' KOP= 4800' 20"COND, -110 ' [ 2200' _I-14-1/2"OTIS X NP,D=3.813" Max Angle= 111°@ 10411' _#. . Datum MD= 9498' D= " Datum ND= 8800'SS GAS LFT MANDRELS ST MD ND DEV TYPE VLV LATCH SIZE DATE 13-3/8"CSG,68#,L-80 BUTT,D=12.415" -1 2685' 5 2979 2979 1 M413 DOME RK r 16 09/27/14 4 4981 4974 15 MNG SO RK r 20 09/27/14 3 6430 6246 32 MM3 DMY RK ' 0 06/24/14 2 7630 7274 30 MNG DMY RK ' 0 06/24/14 Minimum ID = 2.377" @ 10292' 1 8708 8213 29 MNG DMY RK ' 0 06/24/14 3-1/4" X 2-7/8" XO 8786' ]-14-1/2"OM X NP,D=3.8137i M 8814' 1-1_8-5/8*X 4-1/2"AHC HYD SET PKR,D=3.903" 8849' -14-112"OTlS X NP,D=3.813"J TOP OF 3-1/2"X 3-1/4'X 2-7/8"LNR - 8872' I 8872' --3.710"DEPLOY SLV,D=3.00" *. 8894' 3-112"HES X NPPLE,D=2.812" 8920' -I4-1/r Oils XN MP,D=3.725"(BEANO CT LNR) 4-1/2'TBG,12.6#,13CR-85 VA 8949' ., •� 8949' [-4-1/2"WLEG,D=3.958" .0152 bpf,D=3.958" * di% ****;kti TOP OF 5-1/2'LINR H 8995' 1--P; 8996' 9-5/8"X 5-1/2"TTW LNR HGR,D=4.866" y 1 .*: 9-5/8"CSG,47#,L-80 NSCC,D=8.681" 9238' 7• ,l' [3-1/2" 10 '.44i LAI LNR,9.3#,L-80 STL,.0087 bpf,D=2.992" 1- 9278' I 9278'_ -3-1/2"X 3-1/4"XO,ID=2.786" + .' .t .►?w „ft 5-1/2"WHPSTOCK(12/12/17) - 9644' r 9612' j-�5-t/2"MARKER JOII_j 5-1/2"LHR, 17#,L-80 BUTT,.0232 bpf,D=4.892" --I -9644' . far f,, trr. MILLOt1T WINDOW(F-22A)9646`-9656' %+i+ ry+. ,`.."4.' *t. [3-1/4"LHR,6.6#,L-80 TC11,.0079 bpf,D=2.85" -( 10292' t t* ti: 10292' 3-114"X 2-718"XO,D=2.377" PERFORATION SUMMARY --_-_-_-------._� REF LOG: ON / I_ ? : ANIGLEATTOP PERF:61°@11745' ::'.•!' 10679' j-PUPJfw/RATAG] Note:Refer to Production DB for historical perf data +�+`. SIZE SPF INTERVAL Opn/Sqz SHOT SOZ y +' 2" 6 11745- 11776 0 06/03/17 .i, iy'4, _ ... P-3-17--AD `_11791' +:w. •.+. 2-7/8"LHR,6.5#,L-80 TC11,.0058 bpf,D=2441• I- 11830' : � + DATE REV BY COMMENTS DATE REV BY C0P0?UTTS PRUDHOE BAY UNIT 08/28/89 N-18E ORIGINAL COMPLETION WELL: F-22A 06/25/14 D-16 RWO FERMI No: 216-163 05/25/17 N•CDR2 CTD(F-22A) AR No: 50-029-21951-01 05/30/17 JM? DRLG HO COF E:CTTONS SEC 2,T11N,R13E,2096'FHL.&2178'FEL 06/19/17 ZB/JM) FINAL ODE AFFROVAL 06/19/17 DLW/JM7 PE2FS(06/03/17) BP Exploration(Alaska) i North America-ALASKA-BP Page 1 of 12 Operation Summary Report Common Well Name:F-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/13/2017 End Date:5/23/2017 X3-0186X-C:(1,893,831.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB @64.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 5/13/2017 08:00 - 12:00 4.00 MOB P PRE RIG DOWN PREPARE TO MOVE OFF OF F-35 -FOLLOW MOVE RIG CHECKLIST -PRE-JOB MEETING ON MOVING OFF OF WELL -WHEELCHOCKS PLACED BEHIND TIRES TO PREVENT ROLL BACK INTO WELL -RADIO COMMUNICATION AND HAND SIGNALS CONFIRMED WITH NABORS AND PEEK CREWS -STOP COMMAND WAS AGREED ON BYALL AS VERBAL OR HAND SIGNAL 12:00 - 21:00 9.00 MOB P PRE MOVE RIG AND PITS TO SIDE OF LOCATION 1-SPOT RIG MATS -PRE-JOB MEETING ON MOVING ON TO WELL -WHEELCHOCKS PLACED BEHIND TIRES TO PREVENT ROLL BACK INTO WELL -RADIO COMMUNICATION AND HAND SIGNALS CONFIRMED WITH NABORS AND PEEK CREWS -STOP COMMAND WAS AGREED ON BY ALL AS VERBAL OR HAND SIGNAL -RIG ACCEPT AT 21:00 5-13-17 21:00 - 00:00 3.00 MOB P PRE RIG UP ON F-22 INSTALL TRANSDUCERS ON TREE TO MONITOR THERMAL EXPANSION. 5/14/2017 00:00 - 06:00 6.00 MOB P I PRE RIG UPON F-22A -FOLLOW RIG UP CHECK LIST 1-LEAK TIGHT TEST MASTER AND 1 SWAB.GOOD TEST !-REMOVE TREE CAP AND NIPPLE UP BOPE. -SERVICE TREE VALVES AND GREASE RIG VALVES. 06:00 - 09:15 3.25 MOB P PRE NIPPLE UP BOP. FLUID PACK BOP,CONDUCT BODY TEST. ALL GOOD,STATE AOGCC REP NOTIFIED. 1-STATE AOGCC REP GUY COOK ON I LOCATION,BEGIN BOP TEST 09:15 - 12:00 2.75 BOPSUR P PRE CONDUCT BOP PRESSURE TEST TO AOGCC, BP,AND NABORS REQUIREMENTS -TEST ALL COMPONENTS TO 250 PSI LOW/ 3500 PSI HIGH WITH 2-3/8"AND 3-1/2"TEST !JOINTS 1-CONDUCT TESTING OF ALL BOP COMPONENTS RAM LOCKS WITH LOCKING PRESSURE BLED OFF TO 0 PSI BACK TO RESERVOIR TANK -CONDUCT DRAWDOWN TEST ON ACCUMULATOR -BOP CONFIGURATION: ANNULAR ! UPPER BLIND/SHEAR RAMS UPPER 2-3/8"PIPE/SLIP RAMS 3"PIPE/SLIP RAMS 2-3/8"X 3-1/2"VBR ' LOWER BLIND/SHEAR LOWER 2-3/8"PIPE/SLIP RAMS -TEST ALL ALARMS WITH AOGCC REP ON SITE Printed 6/13/2017 4:02:48PM "All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 2 of 12 Operation Summary Report Common Well Name:F-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/13/2017 End Date:5/23/2017 X3-0186X-C:(1,893,831.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB @64.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 13:00 1.00 BOPSUR P PRE CONDUCT PRE-SPUD WITH ENTIRE TEAM. -CONDUCT H2S RIG EVAC BRIEFING WITH ENTIRE CREW. DISCUSSION AROUND INDICATORS OF AN H2S ENVIRONMENT, -PERSONAL VERSUS RIG ALARM LEVELS, EVACUATION AT 10 PPM INDICATOR,WHAT TO DO AT MUSTER LOCATION,AND WHO IS AUTHORIZED TO GIVE ALL CLEAR FOR RE-ENTRY ON TO RIG. GIVE ALL CLEAR, CREW BACK TO WORK. 13:00 - 16:45 3.75 BOPSUR P PRE RESUME TESTING BOP WITH STATE AOGCC REP GUY COOK ON LOCATION -CONDUCT CONTINUAL IMPROVEMENT BRIEF WITH SELECT CREW MEMBERS,SITE CONTROL,MUD ENGINEER AND WSL 16:45 - 00:00 7.25 BOPSUR N SFAL PRE DURING ANNULAR TEST,TEST JOINT WAS SECURED IN LOWER 2-3/8"PIPE SLIP RAMS. 250 PSI TEST WAS GOOD. CREW TOOK TEST UP TO THE 3500 PSI TEST PRESSURE AND HEARD A"THUMP"AND SAW THE TEST JOINT RISE SEVERAL INCHES AT THE SURFACE i LUBRICATOR. PULLED THE TEST JOINT, LOWER-6"BELOW THE LOWER MOST 2-3/8" SECTION SECURED IN THE PIPE-SLIP RAMS HAD SHEARED OFF AT THE PIN. -CONTRACTOR WORK TO DRAIN STACK,ND BOP AT BASE FLANGE,RECOVER SHEARED PIECE AND REPLACE 2-3/8"RAMS. BARRIER TO THE WELL IS THE TWC,CLOSED IN MASTER AND SWAB WITH A PASSING LEAK TIGHT TEST AT 3500 PSI. -REPLACED RAMS,REMOVED SHEARED SECTION FROM ON TOP OF SWAB VALVE. I-CONDUCT SHELL TEST TO 3500 PSI, PASSING TEST. CALL AOGCC REP BACK OUT. -INSTALL 2 3/8"TEST JOINT AND SECURE IN PLACE TO CONDUCT ANNULAR TEST AGAIN -PRESSURE UP TO 250 PSI LOW,PASSING TEST. -PRESSURE UP TO 3500 PSI HIGH,REPEAT OF PRIOR TEST,TEST JOINT SLIPS IN THE RAMS. TROUBLE SHOOT LOWER SLIP RAMS. -PURGE AIR FROM HYDRAULIC LINES -LOCATE AND CHANGE 2 3/8"RAMS. 5/15/2017 00:00 - 04:00 4.00 BOPSUR N SFAL I PRE CHANGE OUT LOWER 2 3/8"RAMS -CHECK RAM CLOSING PRESSURES -TEST OFF THE CHART TO SEE IF HOLDING. GOOD TEST -CONTACT STATE REPRESENTATIVE GUY COOK FOR RESUMPTION OF BOP TESTING Printed 6/13/2017 4:02:48PM "All depths reported in Drillers Depths* • North America-ALASKA-BP Page 3 of 12 Operation Summary Report Common Well Name:F-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/13/2017 End Date:5/23/2017 X3-0186X-C:(1,893,831.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB Cp64.54usft(above Mean Sea Level) Date From-To i Hrs i Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 09:30 5.50 BOPSUR P PRE RESUME BOP PRESSURE TEST TO AOGCC, BP,AND NABORS REQUIREMENTS -TEST ALL COMPONENTS TO 250 PSI LOW/ 3500 PSI HIGH WITH 2-3/8"AND 3-1/2"TEST JOINTS -CONDUCT TESTING OF ALL BOP COMPONENTS RAM LOCKS WITH LOCKING PRESSURE BLED OFF TO 0 PSI BACK TO RESERVOIR TANK -CONDUCT DRAWDOWN TEST ON ACCUMULATOR I-BOP CONFIGURATION: ANNULAR UPPER BLIND/SHEAR RAMS UPPER 2-3/8"PIPE/SLIP RAMS 3"PIPE/SLIP RAMS 2-3/8"X 3-1/2"VBR LOWER BLIND/SHEAR LOWER 2-3/8"PIPE/SLIP RAMS -COMPLETE BOP TEST 09:30 - 14:45 5.25 BOPSUR P PRE STAB ON WITH INJECTOR,FLUID PACK COIL. I-TORQUE TREE BOLTS WITH INJECTOR ON CONDUCT CREW CHANGEOUT AND VALVE ALIGNMENT CHECKLIST -PRESSURE TEST INNER REEL VALVE AND PACKOFFS TO 250 PSI LOW/3500 PSI HIGH. GOOD TESTS. -BREAK OFF,MAKE UP UQC AND TEST FLOATS IN UQC TO 250 PSI LOW/3500 PSI HIGH. GOOD TEST. -BREAK OFF WITH INJECTOR. 14:45 - 15:45 1.00 BOPSUR P PRE LINE UP AND PRESSURE TEST CHOKE MANIFOLD VALVES 9 AND 10 FROM REVERSE DIRECTION TO 250 PSI LOW/3500 PSI HIGH. GOOD TEST. 15:45 - 22:00 6.25 DHB P PRE MOBILIZE LUBRICATOR TO RIG FLOOR -PJSM ON MAKING UP LUBRICATOR, PRESSURE TESTING -PRESSURE TEST LUBRICATOR 250 PSI LOW,3500 PSI HIGH.PASSING TEST. -OPEN SWAB VALVE AND EQUALIZE PRESSURE WITH 2000 PSI. -ENGAGE TWC AND PULL,WELL PRESSURE 2300 PS -BLEED PRESSURE TO TIGER TANK AND PURGE LUBRICATOR WITH METHANOL. -CLOSE SWAB VALVE,PERFORM LEAK TIGHT TEST.PASSSING TEST. -BLOW DOWN LINES TO TIGER TANK -HOLD PRE-JOB MEETING ON REMOVING LUBRICATOR. -LAY DOWN LUBRICATOR -BLOW DOWN SURFACE LINES 22:00 - 00:00 i 2.00 CONDHL P PRE PREPARE TO BULLHEAD KILL WELL -HOLD PRE-JOB MEETING WITH CREWS -BRING PUMPS ON LINE THEN UP TO RATE. -PUMP 257 BBLS KCL FOLLOWED BY 20 BBLS HI-VIS FOLLOWED BY 145 BBLS 8.6 PPG MUD -PUMP la 100 SPM ON TWO PUMPS=4.7BPM. Printed 6/13/2017 4:02:48PM `AII depths reported in Drillers Depths* North America-ALASKA-BP • Page 4 of 12 Operation Summary Report Common Well Name:F-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/13/2017 End Date:5/23/2017 X3-0186X-C:(1,893,831.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORSALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB @64.54usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/16/2017 00:00 - 02:00 2.00 CONDHL P PRE COMPLETE BULLHEAD KILL -DISPLACE 10 BBLS HI-VIS INTO PERFS -SHUT DOWN FLOW CHECK 10 MINS.STATIC -CHECK LOSS RATES,INITIAL LOSS RATE 4 BPH -FILL COIL 02:00 - 03:30 1.50 STWHIP P WEXIT I MAKE UP MILLING ASSEMBLY -HOLD PJSM -MAKE UP SAFETY JOINT -MAKE UP MILLS,MOTOR TO MWD. -STATIC LOSS RATE INCREASED TO 11 BPH -MUD WT IN AND OUT 8.6 PPG. 03:30 - 05:30 2.00 STWHIP P WEXIT I RIH WITH 2 3/8"MILLING BHA#1FROM 117'MD RATE:.67 BPM IN,1.08 BPM OUT.CIRC PRESSURE:912 PSI -MUD WEIGHT:8.6 PPG IN,8.48 PPG OUT -INJECTOR ON @ 03:30 -RIH WITH NO ISSUES. DRY TAG WHIPSTOCK AT 9666'UNCORRECTED DEPTH. ON WITH PUMPS,TAG AT 9665' UNCORRECTED DEPTH. 05:30 - 19:00 13.50 STWHIP P WEXIT BEGIN MILLING OPERATIONS FROM 9665'AT 2.80 BPM -FREE SPIN 2660 PSI 1-MILL AT 2.79 BPM,2780-2970 PSI,.48-2.1K WOB -MW IN 8.69 PPG,MW OUT 8.60 PPG,INITIAL LOSSES 7 BPH,DROPPED TO-4 BPH -BLEED IA FROM 200 PSI DOWN TO 0 PSI, ALL GAS EXPANSION. 19:00 - 20:45 1.75 STWHIP P WEXIT PERFORMED 10 MINUTE PUMPS OFF FLOW CHECK. WELL STATIC. INJECTOR OFF AT 19:00 GAUGE MILLS 3.80"TIGHT GO/3.79"NOGO MAKE UP DRILLING BHA. RIH 20:45 - 00:00 3.25 DRILL P PROD1 RIH WITH 3.0"DRILLING BHA#2 -RATE:0.5 BPM IN,0.92 BPM OUT.CIRC PRESSURE:1200 PSI -MUD WEIGHT:8.61 PPG IN,8.61PPG OUT -STOP AT FLAG. -5'CORRECTION TO THE FLAG. -DRILLAHEAD TO 9710' 5/17/2017 00:00 - 02:00 2.00 DRILL P PROD1 PICK UP ONCE RA VISIBLE. LOG PRIMARY TIE IN WITH-11'CORRECTION PICK UP. LOG CCL FOR LINER TOP PLACEMENT. CONTINUE TO LOG ACROSS RA TAG TO TIE IT INTO PDC.RA CAME IN AT 9653' 02:00 - 05:00 3.00 DRILL P PROD1 DRILL 4.25"LATERAL FROM 9710'-9751 MD -FREE SPIN:3081 PSI,2.85 BPM -RATE:2.78 BPM IN,2.72 BPM OUT.CIRC PRESSURE:3081-3550 PSI -MUD WEIGHT:8.71 PPG IN,8.62 PPG OUT, ECD:10.49PPG -ATTEMPT TO BRING ECD UP TO 11.0 PPG. START PUSHING FLUID AWAY. BACK ECD DOWN TILL MAINTAINING MINIMAL LOSSES. -UNABLE TO BUILD ANGLE,TRACKING CASING AND ORIGINAL WELLBORE Printed 6/13/2017 4:02:48PM *All depths reported in Drillers Depths* • North America-ALASKA-BP 0 Page 5 of 12 Operation Summary Report Common Well Name:F-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/13/2017 End Date:5/23/2017X3-0186X-C:(1,893,831.00) Project:Prudhoe Bay Site:PB F Pad 1 Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM 1 Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB©64.54usft(above Mean Sea Level) Date From-ToHrs I Task Code NPT NPT Depth Phase Description of Operations (hr) + (usft) 05:00 - 08:00 3.00 DRILL N 1 DPRB I 9,750.00 PROD1 POH FOR BHA -MONITOR WELL FOR 10 MINUTES AT WINDOW:STATIC -CLOSE EDC,POWER DOWN '-POH PUMPING AT 3.13 BPM WITH HOLDING 10.5 PPG EMW -MONITOR WELL FOR 10 MINUTES AT BHA: STATIC, 1-CONDUCT HANDLING BHA PJSM REVIEW PROCEDURE FOR NON-SHEARABLE ACROSS THE STACK -INJECTOR OFF 07:40 BIT SHOWED CHIPPED CUTTERS ON OUTER I ROW 08:00 - 09:00 1.00 DRILL N DPRB 9,750.00 PROD1 1 RE-CONFIGURE BHA 09:00 - 10:00 1.00 DRILL N DPRB 9,750.00PROD1 I WAIT ON BIT AND OCN FROM ANCHORAGE RIG TEAM 10:00 - 11:00 1.00 DRILL N DPRB 9,750,00 PROM 1 MAKE UP BIT AND BHA -STAB INJECTOR AT 10:55 11:00 - 13:30 2.50 DRILL N DPRB 9,750.00 PROD1- RIH WITH 3.0"DRILLING BHA#3 RATE:0.5 BPM IN -CLOSE EDC I MUD WEIGHT:8.61 PPG IN,8.61 PPG OUT ' -19"CORRECTION TO THE FLAG. 13:30 - 18:00 4.50 I DRILL P PROD1 DRILL 3.75"build FROM 9751-9790 MD -FREE SPIN:3081 PSI,2.85 BPM -RATE:2.78 BPM IN,2.72 BPM OUT.CIRC PRESSURE:3081-3550 PSI -MUD WEIGHT:8.71 PPG IN,8.62 PPG OUT, ECD:10.49PPG 18:00 - 21:20 3.33 DRILL N DPRB 9,790.00 PROD1 PULLED OUT OF WELL FOR LATERAL BHA PERFORM FLOW CHECK AT 200', WELL STATIC. 21:20 - 00:00 2.67 DRILL N DPRB 9,790.00 PROD1 RIH WITH LATERAL BHA 8.78 PPG IN/8.68 PPG OUT 5/18/2017 00:00 - 10:00 10.00 DRILL 1 P PROD1 DRILL4.25"LATERAL BHA to 10,230'MD -FREE SPIN:2934 PSI,2.80 BPM -RATE:2.80 BPM IN,2.74 BPM OUT.CIRC PRESSURE:2935-3574 PSI -MUD WEIGHT:8.75 PPG IN,8.69 PPG OUT, I ECD:10.50 PPG -ROP:46 FT/HR,WOB:2.5-3.5 KLBS CONTINUE DRILLING AHEAD. AFTER 50' 1 DEPARTURE OFF KICK OFF POINT. NO I I CLEAN SURVEY ' DISCUSS WITH ODE. DRILLANOTHER 30'. SURVEYS PASSING. CONTINUE DRILLING AHEAD. 10:00 - 11:45 1.75 DRILL I P i PROD1 IWIPER TO WINDOW I i -DIFFUICULT WORKING THROUGH AREA I BELOW WHIPSTOCK -GR TIE-IN ADD 1.5' 1 11:45 - 18:00 6.25 DRILL P 1 PROD1 DRILL 4.25"LATERAL BHA to 10348'MD -FREE SPIN:3350 PSI,2.80 BPM -RATE:2.80 BPM IN,2.74 BPM OUT.CIRC f PRESSURE:3650 PSI MUD WEIGHT:8.75 PPG IN,8.69 PPG OUT, ECD:10.80 PPG -ROP:25-85 FT/HR,WOB:2.5-3.5 KLBS Printed 6/13/2017 4:02:48PM *All depths reported in Drillers Depths* • North America-ALASKA-BP Page 6 of 12 Operation Summary Report Common Well Name:F-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/13/2017 End Date:5/23/2017 X3-0186X-C:(1,893,831.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB©64.54usft(above Mean Sea Level) Date From-To Hrs Task Code ', NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 20:00 2.00 DRILL P PROD1 DRILL 4.25"LATERAL FROM 10348'MD TO 10372' -FREE SPIN:3527 PSI,2.87 BPM -RATE:2.88 BPM IN,2.88 BPM OUT.CIRC PRESSURE:3527—3700 PSI -MUD WEIGHT:8.77 PPG IN,8.70 PPG OUT, ECD:10.79 PPG HOLDING 300 PSI ON MPD CHOKE. -ROP:12 FT/HR,WOB:3.5—4.0 KLBS ROP CONSISTENTLY FALLING OFF WITH ADDED WOB. DISCUSS WITH ODE. PULL FOR BIT PUMP 10 BBL LOVIS/10 BBL HIVIS PILL. 20:00 - 23:15 3.25 DRILL P PROD1 PERFORM 10 MIN DYNAMIC MPD FLOWCHECK. STATIC 1-MUD WEIGHT:8.75 PPG IN,8.70 PPG OUT WELLHEAD PRESSURE:308 PSI -RATE:2.89 BPM IN,2.87 BPM OUT -WIPER UP TO WINDOW AT DRILLING RATE. OPEN EDC,POH FROM 9645'MD TO 200'MD -RATE:4.0 BPM.CIRC PRESSURE:3232 PSI PULLED 20K OVER AT BIT AT 9751' RIHAND MOVE DOWN WITH NO PROBLEM. SLOW PUMPS TO MIN RATE. PULLED 20K AT 9718'. ORIENT AND SLIDE BY. 23:15 - 00:00 0.75 DRILL P PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC -CLOSE EDC,POWER DOWN -INJECTOR OFF:23:45 -CREW CHANGE. START LAYING BHA DOWN 5/19/2017 00:00 - 00:45 0.75 DRILL P PROD1 MAKE UP 3.0"DRILLING BHA#5 -PICK UP 2-7/8"M1XLS MOTOR(1.2 DEG AKO) AND 3.0"COILTRAK TOOLS -MAKE UP 4-1/4"HYCALOG SRFX3211M-C3 BICENTER BIT -SURFACE TESTED TOOL.GOOD TEST. -PRESSURE TEST QTS TO 250 PSI LOW FOR 5 MINUTES/3500PSI HIGH FOR 5 MINUTES -INJECTOR ON:00:45 00:45 - 03:00 2.25 DRILL P PROD1 RIH WITH 4-1/4"DRILLING BHA#5 1-RATE:0.59 BPM IN,1.13 BPM OUT.CIRC PRESSURE:1950 PSI -MUD WEIGHT:8.71 PPG IN,8.71 PPG OUT -LOG DOWN FOR TIE-IN FROM 9280' (FORMATION)WITH-14'CORRECTION 03:00 - 03:45 0.75 DRILL P ! PROD1 CLOSE EDC. PUMP AT MINIMUM RATE 'THROUGH WINDOWAND DOWN BELOW PILOT HOLE ALONG CASING. MAKING MULTIPLE ATTEMPTS. KEEP MATACKING WEIGHT AT 9756' ATTEMPT TO ORIENT. FINALLY POPPED BY. CONTINUE RUNNING IN THE HOLE Printed 6/13/2017 4.02:48PM *All depths reported in Drillers Depths* • • North America-ALASKA-BP Page 7 of 12 Operation Summary Report Common Well Name:F-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/13/2017 End Date:5/23/2017 ,X3-0186X-C:(1,893,831.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB @64.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:45 - 14:30 10.75 DRILL P PROD1 DRILL 4-1/4"LATERAL FROM 10372' -10,756' MD -FREE SPIN:3524 PSI,2.80 BPM -RATE: 2.80 BPM IN,2.80 BPM OUT.CIRC PRESSURE:3524 PSI MUD WEIGHT:8.57 PPG IN,8.69 PPG OUT, ECD:10.58 PPG -AFTER MUD SWAP. FREE SPIN:3055PSI, 2.80 BPM -RATE: 2.80 BPM IN,2.80 BPM OUT.CIRC PRESSURE:3365 PSI MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT, ECD:10.82 PPG ROP FELL OFF,DRILL CUTTING SAMPLE 70% jCHERT 14:30 - 18:00 3.50 DRILL P PROD1 PERFORM 10 MIN-DYNAMIC MPD FLOWCHECK. STATIC -MUD WEIGHT:8.6PPG IN,8.64 PPG OUT WELLHEAD PRESSURE:512 PSI RATE:2.80 BPM IN,2.80 BPM OUT -WIPER UP TO WINDOWAT DRILLING RATE -UP TO 9761, JOGGED HOLE,PULLED AT MIN RATE FROM 9757-9620,NO ISSUES OPEN EDC,POH FROM 9645'MD TO 200'MD -RATE:4.07 BPM.CIRC PRESSURE:2997PSI 18:00 - 18:30 0.50 DRILL P PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC -CLOSE EDC,POWER DOWN INJECTOR OFF:18:00 -PULL BHA OUT UP TO BIT/REPLACE BIT -RUN BHA BACK INTO WELL -SURFACE TESTED TOOL.GOOD TEST. -PRESSURE TEST QTS TO 250 PSI LOW FOR 5 MINUTES/3500 PSI HIGH FOR 5 MINUTES -INJECTOR ON:18:25 18.30 - 22:00 3.50 DRILL P PROD1 RIH WITH 4-1/4"DRILLING BHA#6 FROM SURFACE TO 9280'MD RATE:0.56 BPM IN,0.96 BPM OUT.CIRC PRESSURE:833 PSI -MUD WEIGHT:8.53 PPG IN,8.53 PPG OUT LOG DOWN FOR TIE-IN FROM 9280'TO 9296' (FORMATION)WITH+-18'CORRECTION -CONTINUE IN HOLE. CLOSE EDC ABOVE WINDOW. RUN THROUGH WINDOW. ORIENT 90°LOHS AT MIN RATE.WENT BY WITH NO ISSUES. CONTINUE IN HOLE TO BOTTOM. 22:00 - 00:00 2.00 DRILL P PROD1 DRILL 4.25"LATERAL FROM 10756'MD TO 10824'MD -FREE SPIN:3300 PSI,2.80 BPM -RATE:2.80 BPM IN,2.80 BPM OUT.CIRC PRESSURE:3300-3700 PSI -MUD WEIGHT:8.61 PPG IN,8.56 PPG OUT, ECD:10.84 PPG ROP:42 FT/HR,WOB:3.5-4.0 KLBS -460 PSI WELLHEAD PRESSURE. 10.7 PPG ECD AT WINDOW. Printed 6/13/2017 4.02.48PM •AII depths reported in Drillers Depths* • . North America-ALASKA-BP Page 8 of 12 Operation Summary Report Common Well Name:F-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/13/2017 End Date:5/23/2017 X3-0186X-C:(1,893,831.00) L Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB @64.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/20/2017 00:00 - 06:30 6.50 DRILL P PROD1 DRILL 4.25"LATERAL FROM 10824'MD TO 10927' -FREE SPIN:3190 PSI,2.80 BPM -RATE:2.80 BPM IN,2.80 BPM OUT.CIRC PRESSURE:3190—3700 PSI -MUD WEIGHT:8.63 PPG IN,8.57 PPG OUT, ECD:10.87 PPG -ROP:19 FT/HR,WOB:3.5—4.0 KLBS ,-460 PSI WELLHEAD PRESSURE. 10.7 PPG ECD AT WINDOW. ROP SLOWED TO LESS THAN 6'/1-IR 06:30 - 09:30 3.00 DRILL P PROD1 PERFORM 10 MIN DYNAMIC MPD FLOWCHECK. STATIC -MUD WEIGHT:8.6PPG IN,8.64 PPG OUT WELLHEAD PRESSURE:502 PSI -RATE:2.80 BPM IN,2.80 BPM OUT WIPER UP TO WINDOWAT DRILLING RATE UP TO 9761, -JOGGED HOLE,PULLED AT MIN RATE FROM 9757-9620,NO ISSUES OPEN EDC,POH FROM 9645'MD TO 200'MD RATE:4.11 BPM.CIRC PRESSURE:3135 PSI 09:30 - 10:30 1.00 f DRILL P PROD1 BREAK BITAND LD BHA TO PIPESHED -BIT GRADE 2-2-CT-A-X-I-CT-PR 10:30 - 12:00 1.50 DRILL P PROD1 PJSM ON CUTTING COILAND E-LINE -CUT COILAND E-LINE -MAKE FINAL CUT WITH HAND CUTTER -CLEAN AND CLEAR FLOOR OF CUT COIL 12:00 - 18:00 6.00 DRILL P PROD1 RE-HEAD COIL AND TEST -TEST E-LINE -INSTALL COIL CONNECTOR -PULL TEST CONNECTOR TO 50 K -TEST COIL CONNECTOR TO 4200 PSI -OPEN WELL BACK UP. FILL HOLE WITH 1 BBL MUD SIMOP OPERATION;INSPECTION OF THE MAST BY THIRD PARTY INSPECTOR 18:00 19:00 1.00 DRILL P PROD1 MAKE UP4.25"DRILLING BHA#7 -PICK UP 2-7/8"M1XLS MOTOR(1.2 DEG AKO) AND 3.0"COILTRAK TOOLS -MAKE UP 4.25"HYCALOG SRFX3611M-B6 BICENTER BIT -SURFACE TESTED TOOL.GOOD TEST. -PRESSURE TEST QTS TO 250 PSI LOW FOR 5 MINUTES/3500 PSI HIGH FOR 5 MINUTES -INJECTOR ON:18:50 Printed 6/13/2017 4:02:48PM •AII depths reported in Drillers Depths* • • North America-ALASKA-BP Page 9 of 12 Operation Summary Report Common Well Name:F-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/13/2017 End Date:5/23/2017 'X3-0186X-C:(1,893,831.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB©64.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT j NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 21:30 2.50 I DRILL P PROD1 I RIH WITH 4.25"DRILLING BHA#7 FROM SURFACE TO 9280'MD -RATE:0.49 BPM IN,0.94 BPM OUT.CIRC PRESSURE:1474 PSI MAINTAINING 455 PSI WELLHEAD -MUD WEIGHT:8.59 PPG IN,8.62 PPG OUT -LOG DOWN FOR TIE-IN FROM 9280' (FORMATION)WITH+10'CORRECTION i-INVESTIGATE DISCREPANCY. COUNTER WHEEL HAD GREASE BUILD UP. CLEAN WHEELS. RIH TO WINDOW. SHUT DOWN PUMPS. CLOSE EDC. RUN:THROUGH WINDOW. ORIENT 90°LOHS TO GO INTO PILOT HOLE. 21:30 - 00:00 2.50 DRILL P PROD1 DRILL 4.25"LATERAL FROM 10928'MD TO 11022'MD -FREE SPIN:3300 PSI,2.80 BPM -RATE:2.80 BPM IN,2.80 BPM OUT.CIRC PRESSURE:3300-3582 PSI -MUD WEIGHT:8.60 PPG IN,8.62 PPG OUT, ECD:10.9 PPG -ROP:30 FT/HR,WOB:2.5-4.5 KLBS DISCUSSION WITH PAD OPERATOR ON POSSIBLE NEED TO SHUT F-14 IN. 5/21/2017 00:00 - 04:45 4.75 DRILL P PROD1 DRILL 4.25"LATERAL FROM 11022'MD TO 111153' -FREE SPIN:3300 PSI,2.80 BPM -RATE:2.80 BPM IN,2.80 BPM OUT.CIRC PRESSURE:3300-3582 PSI -MUD WEIGHT:8.63 PPG IN,8.68 PPG OUT, ECD:10.99 PPG ROP:30 FT/HR,WOB:2.5-4.5 KLBS i-EXPERIENCING STICK SLIP. PUMP 5 BBLS LOVIS/5 BBLS HIVIS -PERFORM 1000'WIPER TRIP TO INVERT SECTION 04:45 - 10:00 5.25 DRILL P PROD1 DRILL 4.25"LATERAL FROM 11153'TO 11202 -FREE SPIN:3320 PSI,2.79 BPM RATE:2.79 BPM IN,2.71 BPM OUT.CIRC PRESSURE:3320-3565 PSI I-MUD WEIGHT:8.71 PPG IN,8.67 PPG OUT, ECD:11.04 PPG /10.81 PPG AT WINDOW -ROP:30 FT/HR,WOB:2.5-4.5 KLBS -PERFORM LONG WIPER TO 9760' IMPROVE WEIGHT TRANSFER -INCREASE LUBES 1%TO 3.25% 10:00 - 18:00 8.00 DRILL P PROD1 DRILL 4.25"LATERAL FROM 11202 TO 11324' -FREE SPIN:3450 PSI,2.80 BPM -RATE:2.80 BPM IN,2.69 BPM OUT.CIRC PRESSURE:3450-3795 PSI -MUD WEIGHT:8.74 PPG IN,8.68 PPG OUT, ECD:11.13 PPG /10.81 PPG AT WINDOW I-ROP:LESS THAN 10 FT/H DRILLING SHALE FROM 11,140-11,230'MD -WOB:2.5-4.5 KLBS Printed 6/13/2017 4.02:48PM *All depths reported in Drillers Depths" i S North America-ALASKA-BP Page 10 of 12 Operation Summary Report Common Well Name:F-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:5/13/2017 End Date:5/23/2017 IX3-0186X-C:(1,893,831.00) Project:Prudhoe Bay I Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. i BPUOI:USA00000750 Active datum:F-22 OKB Cp64.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 18:45 0.75 DRILL P PROD1 DRILL 4.25"LATERAL FROM 11324'MD TO 11349' -FREE SPIN:3553 PSI,2.80 BPM -RATE:2.76 BPM IN,2.75 BPM OUT.CIRC PRESSURE:3525-3858 PSI -MUD WEIGHT:8.76 PPG IN,8.73 PPG OUT, ECD:11.18 PPG (-ROP:65 FT/HR,WOB:1.5-3.0 KLBS -STARTED GETTING DIFFERENTIALLY STUCK PULLED FREE AT 65K 18:45 - 21:20 2.58 DRILL P PROD1 PERFORM LONG WIPER TRIP TO WINDOW FROM 11349'MD TO 8800'MD -RATE:2.80 BPM IN,2.80 BPM OUT.CIRC PRESSURE:3543 PSI. WELLHEAD 410 PSI. (10.89 ECD AT WINDOW, 11.18 ECD AT WINDOW) I-PUMP 10 BBLS LOVIS/10 BBLS HIVIS. PUMP OUT THE BIT AND WIPER UP TO WINDOW. -JOG BHA JUST BELOW PILOT HOLE. DROP RATE TO MINIMUM. PULLED 6K OVER AT 9766'. SLACKED OFF TO 9K DOWN AND POPPED FREE. -INCREASE RATE TO 1 BPM. SLOWLY WENT BY WITH NO ISSUES -OPEN EDC, JET WHIPSTOCK TRAY AT 4.5 I BPM. CHASE UP ACROSS 9-5/8"SECTION. I JOG IN HOLE TO INCREASE AV INTO 4-1/2" TUBING TAIL. -LOG TIE IN WHILE PUMPING BOTTOMS UP. 20%INCREASE IN CUTTINGS THEN FELL OFF TO MINIMAL -LOG DOWN FOR TIE-IN FROM 9260' (FORMATION)WITH-3'CORRECTION I CLOSE EDC. -RIH TO BOTTOM. NO ISSUE GOING BY TROUBLE AREA 21:20 - 00:00 2.67 DRILL P PROD1 DRILL 4.25"LATERAL FROM 11349"MD TO 11392'MD -FREE SPIN:3558 PSI,2.78 BPM -RATE:2.80 BPM IN,2.78 BPM OUT.CIRC PRESSURE:3558-3900 PSI -MUD WEIGHT:8.76 PPG IN,8.70 PPG OUT, I ECD:11.18 PPG -ROP:20 FT/HR,WOB:2.5-3.0 KLBS 5/22/2017 00:00 - 04:00 4.00 DRILL P PROD1 DRILL 4.25"LATERAL FROM 11392'MD TO 11560' -FREE SPIN:3674 PSI,2.79 BPM -RATE:2.80 BPM IN,2.80 BPM OUT.CIRC PRESSURE:3674-3892 PSI -MUD WEIGHT:8.80 PPG IN,8.73 PPG OUT, ECD:11.21 PPG 1-ROP:40 FT/HR,WOB:2.5-3.5 KLBS 04:00 - 18:30 14.50 DRILL P PROD1 I DRILL 4.25"LATERAL FROM 11560-11830 MD -FREE SPIN:3600 PSI,2.80 BPM -RATE:2.76 BPM IN,2.70 BPM OUT.CIRC PRESSURE:3674-4100 PSI -MUD WEIGHT:8.84 PPG IN,8.76 PPG OUT, ECD:11.20 PPG -ROP:20-40 FT/HR,WOB:2.5-3.5 KLBS TD WELL. Printed 6/13/2017 4:02:48PM *AII depths reported in Drillers Depths* rNorth America-ALASKA-BP S Page 11 of 12 Operation Summary Report Common Well Name:F-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/13/2017 End Date:5/23/2017 X3-0186X-C:(1,893,831.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB©64.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 22:50 4.33 DRILL P PROD1 PERFORM LONG WIPER TRIP TO WINDOW FROM 11830'MD TO 200'MD -RATE:2.80 BPM IN,2.79 BPM OUT.CIRC PRESSURE:3600PSI -PUMPED 10 BBL LOVIS/10 BBL HIVIS. COMING OUT BIT PRIOR TO PULLING OFF BOTTOM. OPEN EDC ABOVE WINDOW. RIH AND JET TRAY. WIPER UP THROUGH 9-5/8"SECTION. JOG IN HOLE TO PUSH CUTTINGS UPHOLE. -DISCUSSIONS WITH ETL,ODE,AND WS AROUND FUNCTION TEST BEING DUE AT MIDNIGHT. DECISION TO COMPLETE WHILE WIPER TO SURFACE •-HAD OVERPULL COMING THROUGH 11134'. SLOWED PUMPS. WORKED AREA. NO ISSUES. MAINTAINED 90°LOHS AND 1.0 BPM COMING THROUGH PILOT HOLE. NO ISSUES. 22:50 - 23:30 0.67 DRILL P PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC -CLOSE EDC,POWER DOWN. BLEED WELL DOWN. --INJECTOR OFF:23:20 HANG BHA ON TUGGER. -BIT GRADE 6-3-RO-N-X-I-BU-TD/ SWAP BIT WHILE FUNCTION TEST BEING DONE. 23:30 - 00:00 0.50 DRILL P PROD1 PERFORM WEEKLY FUNCTION TEST -CLOSE SWAB VALVE. MONITOR WELL THROUGH MPD LINE. FUNCTION TEST BOTH SETS OF BLIND 'SHEARS RAMS -TAG SWAB AND SPACE OUT MULTI-JOINT FUNCTION TEST -LOWER 2-3/8"PIPE/SLIP RAMS -2-3/8"x 3-1/2"VARIABLE RAMS -3"PIPE/SLIP RAMS 1-UPPER 2-3/8"PIPE/SLIP RAMS j-ANNULAR j PULL MULTI JOINT AND LAY DOWN 5/23/2017 00:00 - 00:30 0.50 DRILL P PROD1 RUN BHA#8 IN OFF TUGGER -PICK UP 2-7/8"M1XLS MOTOR(1.2 DEG AKO) AND 3.0"COILTRAK TOOLS -MAKE UP 4.25"RR HYCALOG SRFX3211M-C BICENTER BIT -SURFACE TESTED TOOL.GOOD TEST. -PRESSURE TEST QTS TO 250 PSI LOW FOR 5 MINUTES/3500 PSI HIGH FOR 5 MINUTES -INJECTOR ON:00:05 00:30 - 03:30 3.00 DRILL P PROD1 RIH WITH 4.25"DRILLING BHA#8 FROM SURFACE TO 9280'MD -RATE:2.96 BPM IN,3.45 BPM OUT.CIRC PRESSURE:3385 PSI -MUD WEIGHT:8.83 PPG IN,8.78 PPG OUT -LOG DOWN FOR TIE-IN FROM 9280' I(FORMATION)WITH+26'CORRECTION LOOKAT COUNTERS. LOG RA TAG TO VERIFY. -OREINT 90°LOHS TO GO BY TROUBLE AREA. NO ISSUE Printed 6/13/2017 4:02:48PM `AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 12 of 12 Operation Summary Report Common Well Name:F-22 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/13/2017 End Date:5/23/2017 X3-0186X-C:(1,893,831.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:OOAM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. I BPUOI:USA00000750 Active datum:F-22 OKB(g64.54usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 04:30 1.00 DRILL P PROD1 RIH WITH 4.25"DRILLING BHA#8 FROM 9280 TO 11,818'MD -RATE:2.76 BPM IN,3.25 BPM OUT.CIRC PRESSURE:3600 PSI -MUD WEIGHT:8.83 PPG IN,8.78 PPG OUT -TAGGED TD AT 11,818 04:30 - 07:30 3.00 DRILL P PROD1 PERFORM WIPER TRIP TO WINDOW FROM 11818'MD RATE:2.74 BPM IN,2.91 BPM OUT.CIRC I PRESSURE:3855 PSI -PUMPED 10 BBL LO VIS/10 BBL HI-VIS. COMING OUT BIT PRIOR TO PULLING OFF !BOTTOM. -POH TO 11,240(BOTTOM OF SHALE) INCREASE IN CUTTING COMING ACROSS SHAKER JOG BACK TO BOTTOM BEFORE GOING TO MIN RATE ACROSS SHALE -POH AFTER CIRCING 10 MINUTES 5-10 K DRAG ACROSS SHALE AT 11,240-11,130 --CONTINUE TO POH AND TIE-IN TO RA TAG - 1+4 FOOT CORRECTION 07:30 - 10:30 3.00 DRILL P PROD1 1RIH -PUMP AT 0.5 BPM 2240 PSI -TAG SHALES 11,133-11,180,WORK THROUGH WITH MIN RATE ON PUMP ! -TAG TD AT 11,230'MD NO CORRECTION TO TD DEPTH 10:30 - 12:30 2.00 DRILL P PROD1 CIRCULATE HOLE CLEAN WTH 8.7 MUD -2.70 BPM 2800 PSI I -JOGGED PIPE FROM 11,600'-11,800'MD NO SIGNIFICANT INCREASE IN CUTTINGS -POH LAYING LINER RUNNING PILL 12:30 - 13:00 0.50 DRILL P I PROD1 OPEN EDC FLUSH WHIPSTOCK SLIDE AND CASING -FLOW CHECK WELL -STATIC 13:00 - 15:30 2.50 i DRILL P PROD1 POH ON BOTH PUMPS LAYING KWF 1- 4.16 BPM 3699 PSI -9.8 KWF -POH AT100FT/MIN j PULL SLOW THROUGH AREA OF 9 5/8" ANNULUS,JOGGED IN HOLE 1 TIME TO INCREASE AV 15:30 - 17:00 1.50 DRILL P lI PROD1 I-CLOSE EDC,POWER DOWN. BLEED WELL DOWN. I -INJECTOR OFF:16:00 ! -LD BHA I -BIT GRADE 1-1 -ALL FURTHER ENTRIES ON F-22 CON REPORT. Printed 6/13/2017 4:02:48PM *AII depths reported in Drillers Depths* • • North America-ALASKA-BP Page 1 of 5 Operation Summary Report Common Well Name:F-22 AFE No Event Type:COM-ONSHORE(CON) Start Date:5/23/2017 End Date:5/26/2017 X3-0186X-C:(890,986.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB @64.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/23/2017 17:00 - 19:00 2.00 CASING P RUNPRD INSTALL BTT SWIVEL. REMOVE QTS AND INSTALL NIGHT CAP ON WELL. I INSTALL CABLE BOOT. M/U 2 JTS OF PH6 TO CT,M/U INJECTOR TO WELL. PJSM AND REVIEW PROCEDURE FOR 'PUMPING SLACK OUT. PUMP 4 BPM FORWARD TO PUMP ALL CABLE SLACK OUT. 19:00 - 20:30 1.50 , CASING P RUNPRD REMOVE INJECTOR,MEASURE CABLE 167' PUMPED OUT. 264'OF CT WAS CUT BACK ON INITIAL SLACK MANAGEMENT ON THIS WELL. INSTALL CABLE BOOT. INSTALL BALL CATCHER NOZZLE. 20:30 - 22:00 1.50 CASING P RUNPRD PRESURE TEST RISER CONNECTION. PJSM AND REVIEW PROCEDURE FOR DROPPING BALL. PUMP 3/4"DRIFT BALL AROUND,RECOVER. 22:00 - 00:00 2.00 CASING P RUNPRD PREP RIG FLOOR FOR RUNNING LINER. RIG UP TONGS AND LITTLE JERKS. VERIFY PIPE COUNT WITH DRILLER, TOURPUSHER,BTT REP AND WSL. VERIFY XO'S FOR SAFETY JOINT. CHECK SUMP DRAIN IS CLEAR,POUR HOT WATER THROUGH IT. I REVIEW PROCEDURE AND PROPER TORQUE FOR LINER SIZES. 5/24/2017 00:00 - 12:30 12.50 CASING P RUNPRD PJSM AND REVIEW PROCEDURE FOR RUNNING LINER WITH ONCOMING CREW. MAKE UP 2-7/8"X 3-1/4"X 3-1/2"LINER 'STRING AS PER APPROVED TALLY. I FILL EVERY JOINT FOR THE FIRST 5 THEN EVERY 5TH JOINT THEREAFTER. AFTER PICKING UP 2ND JT CONDUCT D1 DRILL WITH COYNE CREW. CREW SECURES WELL WITH SAFETY JOINT IN 3 MIN. LAY DOWN SAFETY JOINT,CONDUCT AAR THEN CONTINUE MAKING UP LINER. 1-HANGING LINER WIEGHT 17,500 LBS COMFIRMS COUNTS AND STAB ON AT 12:40 Printed 6/13/2017 4.03:26PM `AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 2 of 5 Operation Summary Report Common Well Name:F-22 AFE No Event Type:COM-ONSHORE(CON) Start Date:5/23/2017 End Date:5/26/2017 X3-0186X-C:(890,986.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB©64.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 18:00 5.50 CASING P RUNPRD RUN IN THE HOLE WITH PRODUCTION LINER -RUN IN AT 100 FPH --LOADED 8.7 PPG DRILLING MUD IN COIL IAND TIMED TO EXIT WHEN WE GOT TO THE TOP OF THE WHIPSTOCK -PUW47K /SOW 28KATWINDOW -HOLDING 11.0 EMWAT THE WINDOW OFF PRESSURE SCHEDULE -NO ISSUES PASSING THROUGH WINDOW AND BUILD SECTION -STARTED TAKE WEIGHT ACROSS THE I SHALE 11,130-11,230 BUT WAS ABLE TO PASS -UNABLE TO PASS FROM 11,400'-11,768' WITHOUT WORKING PIPE. 18:00 - 22:00 4.00 CASING P RUNPRD CONTINUE WORKING PIPE TO 11,768'(BHI DEPTH)NO FURTHER PROGRESS MADE. PUMP SPACERS AND LVT DOWN. TAG 7 TIMES HERE AT VARIOUS SPEEDS, SAME DEPTH. LOWER AND MIDDLE COUNTERS ON REEL BOTH INDICATE A DEPTH OF 11,838'. COUNTERS ON INJECTOR READ 11,768'AND '11,764'. CIRCULATE LVT OUT THE SHOE AND WORK PIPE AGAIN,3 MORE TAGS AT THE SAME SPOT AT VARIOUS RUNNING SPEEDS. I DISCUSS WITH ODE AND AGREE THIS IS TD. CONDUCT 3 PICKUPS AT 30 FT/MIN. UP WT IS 50K EACH TIME WITH CLEAR BREAKOVER DEPTH OF 11,755'. 22:00 23:00 1.00 CASING P RUNPRD PJSM AND REVIEW PROCEDURE FOR DROPPING BALL. LAUNCH 5/8"STEEL BALL WITH 2,000 PSI AND PUMP IT AROUND. SLOW DOWN RATE TO 0.8 BPM AFTER 30 BBLS AWAY. BALL ON SEAT AT 40 BBLS AWAY,SHEARS AT 4,200 PSI. CONDUCT 2 PICKUPS,NEW UP WT IS 35K WITH BREAKOVER AT 11,757'. 23:00 - 00:00 1.00 CASING P RUNPRD STACK WT BACK DOWN AND CIRC WELL TO _ KCL. 5/25/2017 00:00 - 01:30 1.50 ' CASING P RUNPRD CONTINUE CIRCULATING WELL TO KCL. WITH KCL ALL THE WAY AROUND,1.5 BPM= 780 PSI. 01:30 - 02:30 1.00 CASING P RUNPRD PERFORM PRESSURE XCHECK VERIFICATION WITH WSLAND SLB PUMP OPERATOR. 'VERIFY ELECTRONIC OVERPRESSURE TRIPS FUNCTIONING. START PT OF CEMENT LINE UP TO INNER REEL VALVE. GET GOOD LOW,HIGH PT FAILS. GREASE RIG VALVES AND CEMENT VAN VALVES. Printed 6/13/2017 4:03:26PM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 3 of 5 Operation Summary Report Common Well Name:F-22 AFE No Event Type:COM-ONSHORE(CON) Start Date:5/23/2017 End Date:5/26/2017 X3-0186X-C:(890,986.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB©64.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) • 02:30 - 03:30 1.00 CASING N SFAL RUNPRD PRESSURE UP A SECOND TIME,CEMENT VAN VALVES LEAKING. REPLACE 1502 LINE GASKETS IN CEMENT VAN. 1 CEMENT MANIFOLD STILL NOT HOLDING 'PRESSURE. DECISION IS MADE TO SWAP OUT CEMENT UNITS. 03:30 - 09:00 5.50 CASING N SFAL RUNPRD CEMENTING CREW TAKES VAN BACK TO DEADHORSE TO SWAP IT OUT. -REPLACEMENT TRUCK GOT STUCK ON F PAD WHILE POSITIONING TO SPOT UP. -STOP THE JOB AND CALLED THE EXTRACTION TEAM,DEVELOPE SAFE PLAN FOR PULLING THE TRUCK OUT WITH 1 CH2MHILL BED TRUCK -CHANGED OUT CEMENT CREW -SPOT UP TRUCK AND MAKE UP LINES FOR THE CEMENT JOB -CONTINUE CIRCULATING WELL TO KCL. WITH KCLALL THE WAY AROUND,1.5 BPM= 780 PSI.1.5 IN AND 1.41 OUT LOSING 5-8 BPH 09:00 - 10:00 1.00 CEMT P RUNPRD PERFORM PRESSURE XCHECK VERIFICATION WITH WSL AND SLB PUMP OPERATOR. -CONDUCTED PJSM WITH ALL PERSONNEL INVOLVED -VERIFY ELECTRONIC OVERPRESSURE TRIPS FUNCTIONING. -START PT OF CEMENT LINE UP TO INNER REEL VALVE. -GOOD LOW PRESSURE TEST 280 PSI FOR 5 MINUTES • -GOOD HIGH PRESSURE TEST,4820 FOR 5 MINUTES. Printed 6/13/2017 4:03:26PM *AII depths reported in Drillers Depths* • North America-ALASKA-BP I Page of 5 Operation Summary Report Common Well Name:F-22 AFE No Event Type:COM-ONSHORE(CON) Start Date:5/23/2017 End Date:5/26/2017 X3-0186X-C:(890,986.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB @64.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 13:00 3.00 CEMT P RUNPRD MIX AND PUMP 40.0 BBLS OF CEMENT -CEMENT WET AT 10:45 HRS. ZERO IN MM ONCE DENSITY=13.0 PPG LOAD 40 BBLS 15.3 PPG CEMENT IN REEL -SWAP TO RIG PUMP.CLEANUP LINES TO SLB UNIT. PERFORM DISPLACEMENT WITH RIG PUMPS -DISPLACE CEMENT WITH 8.5 PPG EXHAUST PILL RATE:2.0 BPM IN,1.7 BPM OUT -ZERO OUT MM WITH CEMENT AT SHOE AT 75.5 BBLS AWAY -TAKE RETURNS ONE PIT FOR MANUAL STRAP -SHUT DOWN PUMPS AT 93.4 BBLS AWAY 18.5 BBLS BEHIND PIPE) LAUNCH PEE WEE DART AND LINER WIPER PLUG AS FOLLOWS: -PICK UP TO BREAKOVER 10 FT(11744'MD) PER BTT REP,EXPOSE DOGS,SET DOWN AT 11751'MD(10 FT HIGHER) -PU:49 KLBS,SO:21 KLBS -SHIFT LINER WIPER PLUG DOWN,PICK BACK UP TO 11744 MD AND SIDE EXHAUST 5 BBLS -SET DOWN 10KAT 11751'MD AND LAUNCH PEE WEE DART. -PRESSURE UP ON WIPER PLUG AND ZERO MM. -LINER WIPER PLUG SHEARED AT 3400 PSI DISPLACE LINER WIPER PLUG -19.4 BBLS DISPLACED AT 1.5 BPM:2250 PSI -PLUG BUMPED AT 19.4BBLS,3400 PSI(20.1 BBLS CALCULATED) -OPEN BLEEDER AND CHECK FLOATS.GOOD TEST. -CLOSE BLEEDER,PRESSURE UP TO 1775PS1 ON COIL,PICK UP AND CONFIRM PRESSURE DROP -CEMENT IN PLACE:12:29 HRS -39 BBLS CEMENT BEHIND PIPE,BASED ON MANUAL STRAP. -TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE:6.2 BBLS 13:00 - 13:30 0.50 CEMT P RUNPRD CIRCULATE CEMENT OFF TOP OF LINER -PUMP 5 BBL AT 0.5 BPM AT TOP OF LINER -PUMP REMAINER OF EXHAUST PILLAT 3 BPM/2100 PSI -1 TO 4 BARRELS OF CEMENT BACK TO SURFACE 13:30 - 15:00 1.50 CEMT P RUNPRD POH -DYNAMIC FLOW CHECK FOR TEN MINUTES, STATIC -POH PUMPING 8.5 PPG KCL AT 3.1 BPM IN AND OUT -CORRECT FILL DISPLACEMENTS 15:00 - 17:30 2.50 CEMT P RUNPRD FREEZE PROTECT WELL FROM 2550'. LOAD 38 BBLS DIESEL INTO REEL. Printed 6/13/2017 4.03:26PM *All depths reported in Drillers Depths* • North America-ALASKA-BP Page 5 of 5 Operation Summary Report Common Well Name:F-22 AFE No Event Type:COM-ONSHORE(CON) Start Date:5/23/2017 End Date:5/26/2017 X3-0186X-C:(890,986.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:CDR-2 Spud Date/Time:8/26/1989 12:00:OOAM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000750 Active datum:F-22 OKB©64.54usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase i Description of Operations (hr) (usft) 17:30 - 19:00 1.50 CEMT P RUNPRD PJSM FOR PUMPING DIESEL FREEZE IPROTECT. I DISCUSS VALVE LINEUPS AND RETURNS TO TIGER TANK. POOH FINAL 2,550'LAYING IN DIESEL FREEZE PROTECT. STOP AT 200'FOR FLOW CHECK AND PJSM FOR UD BHA. 19:00 - 20:00 1.00 CEMT P RUNPRD MONITOR WELL FOR 10 MINUTES AT BHA: STATIC LAY DOWN 6 JTS OF PH6 AND LINER RUNNING TOOL. RECOVER 5/8"BALL. 20:00 - 21:30 1.50 CEMT P RUNPRD CUT OFF EXCESS ELINE AND BOOT CABLE. MAKE UP NOZZLE AND JET STACK WITH WATER. 21:30 - 23:00 1.50 RIGD P POST CONDUCTPJSMANDREVIEWPROCEDURE WITH SLB NITROGEN CREWAND RIG CREW FOR PURGING REEL WITH N2. PERFORM PRESSURE XCHECK VERIFICATION WITH WSLAND N2 PUMP OPERATOR. VERIFY PRESSURE TRIPS ON N2 UNIT ARE WORKING. PRESSURE TEST N2 LINE TO 250/3,500 PSI, GOOD. PURGE REEL WITH 2,000 SCFM OF N2 FOR 15 MIN. ALLOW PRESSURE TO BLEED OFF. PURGE SURFACE LINES WITH RESIDUAL PRESSURE. 23:00 - 00:00 1.00 RIGD P POST PERFORM LO/TO OF REEL AND REMOVE REEL HARDLINE. 5/26/2017 00:00 - 02:30 2.50 RIGD P POST CONTINUE REMOVING INNER REEL IRON. CONTINUE EMPTYING PITS. REMOVE DEPTH ENCODERS TO PREP FOR UNSTABBING CT. INSTALL GRAPPLE ON END OF CT. 02:30 - 04:00 1.50 RIGD P POST PJSM AND REVIEW PROCEDURE FOR UNSTABBING PIPE. PULL TEST GRAPPLE THEN UNSTAB CT FROM INJECTOR,ROLL IT BACK TO REEL AND SECURE IT THERE. 04:00 - 06:15 2.25 RIGD P POST I SECURE THE CTAT THE REEL USING A CABLE. 06:15 - 07:00 0.75 RIGD P POST SECURE CT,PREP FOR LOWERING REEL. 07:00 - 08:00 1.00 RIGD P POST PURGE LINES WITHAIR. 08:00 - 09:00 1.00 RIGD P POST LEAK TIGHT TEST OF SWAB AND MASTER •WITH MEOH,GOOD TEST. 09:00 - 12:00 3.00 RIGD P POST REMOVE BOPS,INSTALL TREE CAP AND TEST,GOOD. SECURE BOPS FOR TRAVEL. RELEASE RIG AT 12:00. ALL FURTHER ENTRIES TODAY ON D-33 REPORT. Printed 6/13/2017 4 03:26PM 'All depths reported in Drillers Depths' • • Daily Report of Well Operations F-22A ACTIVITYDATE SUMMARY T/I/O= -10/0/0 Post CDR2 Installed Tree Cap assy, Set BPV#130, Removed upper tree, Installed original SSV, reinstalled upper tree, Removed 4" CIW Temp WV#50 and 3" CDR2 reducer, installed tapped blind to WV, Torqued flanges to API Specs, PT'd 300/5000 psi for 5 min ea =PASSED. Pulled BPV#130 Reinstalled tree cap nut and plug PT'd to 500 psi =PASS. RDMO. ***Job Complete*** See Log for details FWP=VAC/0/0 5/27/2017 **NOTE -AAOGC testing required within 5 days of Pop. T/I/O =VAC/VAC/20. Temp = SI. TBG FL (Pre-LLT). WH, scaffold and flowline removed. Tbg FL near surface. 5/27/2017 SV, WV, MV= C. IA, OA= CTG. 09:00 VAC/VAC/20. Temp = SI. Liner lap test to 2329 PASSED (post MIT). Wellhouse, flowline, scaffold removed. T FL near surface. Used 3.4 bbls of diesel to pressure T from 4 psi to 2400 psi. Monitored for 30 min. TP decreased 53 psi in the 1st 15 min & 18 psi in the 2nd 15 min for a total loss of 71 psi in 30 min. Tag hung. Final WHPs = SSV/VAC/20. 5/28/2017 SV, WV, SSV= C. MV= O. IA, OA= OTG. 06:00 CTU#14 1.75" CT Job Scope: RPM/Perf Road unit from DS-09 6/1/2017 ***Job in Progress continue on WSR 06/02/17*** CTU#14 1.75" CT Job Scope: RPM/Perf MIRU. MU and RIH with 2.25" DJN drift BHA. Tagged hard bottom @ 11787'-E/11788'-M. Clean P/U. Stop @ 11730'-E/11731'-M and paint red flag.Make up and run BKR RPM tools, lightly tag PBTD @ 11791' and wait for tols to turn on and got wait back @ 11787', log up @ 20 FPM in Sigma mode to 8600'. log repeat pass from 9820'to 9480'. RIH to 11750' CTM and circulate well to diesel. POOH. Download log data and make (+) 8.5' correction. Send 6/2/2017 data to town to pick perf intervals. CTU#14 1.75" CT Job Scope: RPM/Perf MIRU. MU and RIH with 2.25" DJN drift BHA. 6/2/2017 ***Job in Progress*** CTU#14 1.75" CT Job Scope: RPM/Perf ***Job continued from WSR 06/02/17*** MU and RIH with 31' of 2" Maxforce perf guns. Tag bottom and correct depth top shot. Use BHI RPM log on 06/02/17 as tie-in log. Perf from 11749-11780', good shots fired. On the way out found bad spots on pipe .134"wall thickness. RDMO 6/3/2017 ***Turned well over to Pad op to POP*** • • (.NIall ,„z \Ildi W0 Q= Ca 13- CO Q Q J 0 Q Q • a) co Ce •vL >+ E a Q „C O� N m 0)0) N c. d) r N c. C O a N C ..0 t N N in t0 0 N N O ■ N N Z a` a u_ a_ LL "' 0 N • ___ • CO 1111 I D'S .B _ a CO co Ui MI Z 0 to co- O Co O QDzi. Q E_ n OI O Z C) Q o . o` 0 v v LY LL (a 7 7 a Y d 8 CO CD© U ¢ _, c N Y Y ? x (n > rn ai d LL O O -I N N N C 2 c m CI d y 7 LL LL E- 0W d d N 7 c D J d c- p QI~d O CD J J 0 d > ili 7 O 7 " U C '- c in t J J )CI L 15 w o) :y d E c re c F d O C d - c u U m E 1 c U R IL O o C d N V d p > > C O c co U 2 y ce T N E 0 0 0 I c0 C I(? u p re LL' Z .�. N o^ o V V V I rn y > p i. co) rn W J F 2 2 M p co N co O > > 7 Q (`� N W O O s- O N O O O O O 0) V CO O 0 `n N co d Q1 N- N c Et OO Q .._ Lo- a. Q. o p t CO Z C 7 0 C3 a O C_ E 0 C) O O d W O LL - H N Ci IO N 7 dO C) O] W o, c OI co C) IE r c iii) — IE c .t 2o WO w d ,. y c z W 3 a- 9 d a O p Z : o Q 0 1- 0 0 co Q ao I a 7 p a d N CO N R 1 w p (O 0 O v d d I V C Ci oC N 2 C N N a O0 y O C7 0_ = CO N t` N MN W N � L CO d c0 N 7 0 CO 0 .3 V Q N O O O N LT_ Y Y c O 0 0oo �o O m d Q Q I- O (n c (p CI N d N d N J p O LNi '!. Q E 0 Q Q V 1,-. 0- a LL (V (V Z () (V ((p� (0 0 0 , N N N CO N U a Z O O a Ci li LL C Li C7 d CO Y N N N ',. E d m D a o C7 p I m N N N < Z Z X11 2 W Z 0_ 0_ L LL LL C III C Q Y Cal S d O Q •- C 1.1 C U E O c c c la T d r j P "' 1, V mO N c d N d N c .N A' d cI 2 .. d .V. T co O O O Oa � O OG d . d CI u N p N 0. ", ML cR 0 Ndy d 000 d H d y j p .+ d d d coCI a+ ., ia ° ' 0 Uam3p a 202 0 in 3 a 2 pa > > NI • O C) N O N m CO N O (O m N 7 N C) (0 m IPO O r O r CO N ? CO C) (O CO V r-- Cr) N C) CO CO al al O O O O N C i) V (f) (O (O 1..1r W m O O O a `al m M.um Mil MO j = O SM I I o CO O CO R N (N N N- CO .- M N CO CO C) C) O CO CD c- CO a_ a O O N N O N x- ,- O O .- .- N- O O 00000 C) U O O O O O O O O O O O O O O O O O O O O O zcr) CC/) O d O 0 0 0 O __N� p ?__ 33 d N 4--) Y V R N N co O (0 O N Cr) N 00 N N (0 V V r V N CP (` N C N CO a`a` Q O 0 CO CO O 0) N- CO (O N CO0 1� N 1t O N O N 07 N- co V V o O co N .- o .- CO N CD CO CO CO V 1s 0) N V CO N- N- U ' O N rN- N- (D (O N N V V V d' 7 7 V N N N N N (N CO CO Y V V V 7 7 V' V V V V V V 7 7 7 R V V V' V sr 1 N Y Y E N C CO CO CO CD (O CO CO CD CO CO CD CO CO (D CO O CO O CO CO CO LL 0 0 E N (N ((C () vN) u N (C (C (Nn (Nn (Nn (Nn ((C (6 6) (Nn (Nn (Nn 66 (Nn N N a) .E 2 al7 (O co co (O (O co (O (O (O (O (O (O (O (O (O (O co (O co (O (O .) N N ` _ 0 LL LL H w W O (O V N (O C) N O N M (O CO CO (O CDCO Cr OO O (D 00 CO r CD V Cr) CO C) O O N (D W V (O co M O 0) CO Cr CO O O O N V CO N (O O C) N- N r N n V coCW O 0 Cn _ N- O N V CN O O A O D r r O N - - ONsNsNO C r r NN- N- N- n N- N- N- N N- r ^ N- r-- a) CV L L (= V V V 7 7 V d' V V- V V V 'C 7 . . V . .. . v �°-) m 0N- rn rn CC rn C) rn m 0) 0) 0) N- N. CC rn N- rn N- 0) N- 0) z Z _...,= c hi o as C (a UO C co o co N V O V co co C) s C) O N- V .- (O CD ..- (0'OC C y3 0 0 - 4CD C) CO CO N N- CO N- V N O Ns. N N d'G w NN 36 6 ? N N (? M (7 (? +) (+) CCN N N NO w a 4- re U U m a) a E H c a) Ja o 0 O U .o W = c o) 1 o r .0 O) Ofl' E O O .- N N CO = CON N- CO ,- V N O 0) N- N Q v p O O - N CD CD CO r N. Co CD N 0) N N- CD N N o L O O 6 O N C) V N o Ni r N O W O O N M Z Z 7 n cric LL N (O co (0 (D NV V' C) CO N N N N N V V V; 7 V V V' V V V V V 7 Cr V C V V V (O N N (n N (O N CO N N N N N N N N N N CO CO N el o C) co C') Cl C) C') M C) M C+) C) CO C) M M C•7 C+) C) CO CO CO 0) E Cn .- N CO V N (O N- CO CD C) N C) V N CO Ns CO CD CO Z 2 O n O U 0 F 2- ,2 O 2 (D C) O O O D) CO (n N- N (O (O (O (O (O CO N N N N N CO C) O O o O) 0) CD 0) O) CD CD O CD CD CJ) Cr) CD CD CD CD . CO O O O O 6 CD 0) CD O) 6 6 0) CD D D D 0D N C) O O O (D (D CN- CO 01 0) C) 0) W W 01 ND 0) N 01 Cr N D N- 0 N C) `Cr N CO _ CO DN O _C N 7 .-. E NC) C) CO N N- CO N- N C) C" CO O N CO CO C) 0 N Ns O N U N O O CD .- N N N COCO CO N CO 0) CO CO eCD N- - CO O) N (7 v O C) N- N N C) O W 6N C) m C) a0 C) (C O N _ L .- C) - .- O O CD CD o O N- CO N N N N (O N- N. N N N N N N ' )- N N s- e- s- 2 (r E _ O_ r 3 o co O 3 > •N N m 2 Nn Y (n N 7 " I- O N O N CO N O N CO N- N O N Ns O r N- N CO CO CO Q NN .- 0 O O N V V (O r N N CO V C) C) CO Vel C) C) N N C) O O O O O O O O O O O O O O O O O O O O O O CD 0 CO O (O .� mO N (0 m O .-. C E I- W C la U. N N N O 2 co N N N aZ O_ 0_ U. U. CL p CD O O O O O O O O O C) C) O O O O O O C) C) O C) O O O O 00000 00000 00000 O p N O O O O O O O O O O O O O O O O O O O O N O O O O C) O O O O C) O C) O O O O O O O O E ,- N CO V N (O N CO CD O N C) V N CO N- CO CD O O4)0 , 1.. Q . o �' N 4 C N d W r2 7 N a U O C a T Q 0) d d 0 E a ° m m 'H 2 2 N U d !A to to _.: cl 7CD • m. 1 (O M V A- u) WaD M u) O M N. O u) N 0) V O u) O Q7 Cb (O CO O) M M (n CO O N V (� M 0) u) 0) 0) u) CO O N 0) CO CDI.� M V N a0 0) 0) O N M V u) n N O N M M 0 V aN N N N N N N CO CO C`7 M M M M M M M M7(/J• . 2 m ] - O O co 0) u) O V O N CO u) cc, co CO co u) (O M O CO CO CO N. O 0) V 01 N a A- .- .- .- A- A- A- A- 0 0 O 0 M 0 CONN N 0 O .- 010 M CO U 0 O O O O 0 O O O O o O o O O O 6 O O O O O O O O N O Q w U m 7 O J O O o _O •Q L U (O Y V V N M (O CO CO N N CO r CO CO a0 d) M d1 V M M N r CO u) V CO N- N (C�O`CD l0 n N O CO CO O N CO CO V O 01 CO V CO CO N.. N (- CO CO N- N N- (O V V 7 a N- N 0 V V u) N.. N. N CO u) .- CO 0) A- N CO V M N O CO )O V O N- 0 . u) u) u) u) u) u) u) u) (O CO (- (0 (n CO 0) 0) W 0) 0) O) 0) CO CO CO CO N NCO co Y V V V V V V V V v v 4- V V V V V V V V V v v v v v V Y Y E CO C co (O O (D 0 (O CO 00 CO (O 0 (D 0 0 (O (O (O (O (O (O (O (O (O OCD LL O O E N ((j (Nn (Nn N N (Nn U) U)) U) U) uN) U)) U) (Nn (Nn U)) U) U)) U)) U) U) U)) U)) U) to uN) H 7 (0 (O CO CO CO CO 0 CO CO CO (O CO 0 CO CO CO 0 CO CO CO (D (D (D 0 CO (O -Cr) N N 3 C aO W tL LL F- W N- N O N CO N N CO 0) _ r CO V u) (O u) O M u) CO CO N- N. N CO O (O M u) u) 0 = N. A- 0) (n (V 0 V CD V CO CO V CO V CO 0) N- u) V 01 N- CO CO V O u) 0) M 0) 0) CO 0 CO u) N CD O O N Cn V M N O 0) CO h CO u) V M CA m (O CO u) u) V V M N N V C) V m O O O O O O W o) W W O W 0) D) CO CO CO N 0 CO N CO N CO CO CO Co C N- n N- n N- n CO COO (O (O (O CO u) 00000 CO (O (O 0 (O 0 CO a) L L '' V V V V V V V V V V V V V V V V V V V V V V V V V V « N Y m (P (P W O (11 Q) 0) O) 06 0) O 0) CA W 0) 0) 0) 0) O) CA 0) O 0) 0) 0) U Z (0 (O u) (O u) u) u) u) u) u) u) u) CA (O u) u) u) u) u) u) u) u) u7 u) IO C a, N .7 O C R OpC CO CO u) O CO OD C C V (n N. CO O) CO O N0 N. (O W O (cO- N N V N N- dn M VM (D (D Oc cu w m N N N N N N N O O O O O O O O O O O O O O OO « ` 0O y U (u « KCD L d T.1 0 > R a J F 2 Z (q O W t O CO M M N. V 0) N O N N. 0) CO 0 CO N. O N OD CO N. u) V CO CO )Z CD O N M u) N. CO O N CO V u) CO (n 0 (O (O 0) V 0) 0) Q) N V u) CO N. CO O O N M V u) N. 0) O N M M M V V u) (D (O V ( N N N N N N N N CO CC) C) N M CO CO M M M d N N H m Z Z 7 �O C �.L O O C) CO CO N. (D (D (n N V M N W fp N- O (D 0 O COLD Cn N ✓ V CO CO M M M M CO M CO M CO (�) N N N N N N N N N N N N R u) u) u) u) u) u) O u) in u) (n u) u) N u) u) u) u) (n u) (n (O (A (n u) (O co co co co co CO N CO CO CO CO M M CO M M M M M M M co M co co M N O A- N CO V (O (D CD N- CO 0) O A- N M V u) co r CO co O .- N CO V CO CO N N N N N N N N N N N N M M M M M M M M M M V V V V VEL O (n V V CO N N .- O O 0) 0) CO N- CO u) CO N .- r- O O O O O 0) 0) (D 0) 0) 0) CO CO 0) 0) 0103 N CO CO CO O CO CO N CO CO CO CO CO OO N N N- 0) 0 0 0) 0) 0) V O) 0) 06 0) 0) O 0) 06 O 0) 0) 0) O O CO CD O O 0) O co rn CO 0) CO CO (0 N) 0) 0) _- 0) 0) 0) 01 CO 0) CO CD0 0) O N M V (n CO O N. CO CO 0 O N CO V V 0(n (D N. CO W O N N CO V O = N N N N N N N N N N N M M M M M M M M M M V V V V V 7 CO N- N. CO O O N N M CO M CO N N- CO N O u) u) N N CO CO CO CO M CO O N N- CO N M CO u) N N. N CO V CO V O CD 0 V N (O u) M ✓ M N u) M N- CO 0 N u) r (O N (O 0) O O r 0) (n L CO CO o) co CO N- CO CO u) CO V V (. r N- r n CO 0) O CO N CO CO N V A- .- .- '- .- .- A- '- '- '- A- .-- N N N A- A- N CO E Cu Cu — a. co .N Q (n CO Cb O N CO O N CO u) CO N CO CO co O N N u) O u) CO r O CO u) u) J u) (0 N. (O N- N- N- N. N- N- N.- N- CO 03 0) 0) N. V N A- A- N CO u) V CO (a O O O O O O O O O O O O O O O O O O O O O O O O O N T () — a) m C E a) m a 0 0 -0 (L (V N N O D m N N N a Z R Cl_ lL LL LL O O O O 000 O O O O O O O O O O O O O O O O O O O O 000 000 O O O O O O O O O O O O O O O O O O O O O O O O O u) O O O O O O O O O O O O O O O O O O O Q. LO 0 0 0 0 0 0 0 . O O O 0 0 0 0 0 0 0 0 0 00000 00 Q N M V u) CO CO M r CO 01 O A- N CO V (O CO 1- CO 0) O A- N CO V 0 LO N N N N N N N C7 N N N M M M M M M M M M M V V V V V V d' T N elC .. d rL C� N• V p C T _� E o m 'H 2 N �"j04� ci a in 3 3 0 (') N IIICO N LO CO CO CO LO 0 N CO CO 0 CO O O N N. 0 CO N CO (D V COii mco NI Z 1110.11111 • N cis' m j = ciO N- N O V O U) 0 x- 0 N r O (D V OD CO O CO U) N x- O N- (O M d CO CO O N N x- V (O h CO 0 CO A- U) CO N ' x- CO O CO N N O N M N O N N N N N M N N N N O.- O O O O O O O O O O O O O O O 0 Q N 0 N7 o ..I O o o O Cl) CC) .... n 7 L N 6 )0 J -,1, (0 V co U) O O O (O O O O CO (D O CO CO N I� M 0 U) CO CO N CO M CO O Zx- 0 0 CO CO U) V0 CO u) N- CO CO N- V O N- V O (o (o N...!�,/�` 7 Q CO 0 CO 0 x- 0 N N CO M V V V U) CO CO N CO CO s- CO N- x- M V N CO lJ lJ 0 ' 6 N 00 M I- O N N M M M M M M N N O O Oj Op N I- (O Uj (+j m m Y V V M M N N- O 0) CO N- 0 U) V CO N O O 0 (O U) V M N 0 NE U) CA co co co co (O co (O Co CO L) CO CO CO U) U) L) Cn 10 V V V V V V V V V LI 0 0 7 N N N N N N N N N N N N N N N N N N N N N N N N N N N E H U) L) U) CO CO U) CO U) U) CO CO U) U) U) U) CO CO CO Cl) U) CO U) CO CO CO CO U) • N N N C N 7 0 0 c0 0 0 0 (O 0 (0 0 0 0 0 (0 0 0 (0 0 0 (O 0 0 0 0 0 (0 0 N N N ` 0 W LL LL H W N- CO N V O CO 0) V N- CO N 0 N (0 CO I- (D 0 M O 0) N N O O U) V V O N O (O CO CO N. V O O V (O CO O O CO CO CO U) CO O (O CO N- O O O CO CO O (O CO N V 0 O N- M CO CO (O CO CO (O O O O Cl M N O N. CO O N CO O V M M M V (O 0 V N- ON V CO CO (O (0 U V 0) O O CO 0 CO N CO O V O V O V O V0 CO O CO N- CO 0 c- (O C O C 0 I- I` r I� I` CO CO CO O O O O x- N M CO V V U) U) 0 0 N. N. CO L L e V V V V V V V V V V V U) L) L) U) U) L) U) U) L) N U) U) U) U) L) L) w N t W r n r r N- N. N- N- N. r N. N- N. N- N. N- N. N- r N- N- n N- r N- N- n 7 O O O O O O O O O O O O O O O O O O O O O O O O O O O Z Z L) U) U) CO U) U) U) U) U) U) L) CO U) U) CO CO L) Cl) U) U) CO CO CO L) L) U) (n N O CD 30 C (V U (0 O U 2y 7 (o co V (O N- V L) 0 U) (0 O V N N- V U) CO N. CO V N 0 Cl) C U N N. O O CO CO O co O O O 0 0 O co 0 V O N- V O CO M N M N. C d 2 w A C') cl) 0) M O (D V N O N I- (O CO V V M M M N N N c) wci, d o N N N CO V CO CO (O n CO O O N M V CO CD N. CO O N N N U d m r m a u o Q C Z ,4 J Z to O W — O O V 0 V I- O M 0 N CO N- N V co O O CO CO O (O O O co d O O co O co til CD (D O O N CO CO 0 M V 0 N t` CO CO O N O N Cl) (O (O O O) M M O I- CO (0 (O I- O N CO N M U) N- 0 O N CK (N x- V N- O V CO N I� N N- N N- M CO CO O V O V O CO O CC) O x- x- N N M CO V V CO CO (D (O N- N- CO CO CO O 0 Q. O N y r r CO Z 7 U) CO C LL CO O M V CO O O O CO CO N co CO CO (O CO O O CO M O V O V CO V I- O N O N- 0 M 0 N O 0 V CO x- I- N- N CO Cl) O CO CO V N- O V O CO ✓ V N O N- M r O O O (O N co M N M I- (O O L) O U) (O N I- M M co M N (NO OO N- 0 V co .- O 0 N- U) V N 0) CO CO U) M U) L) 0 N. CO O 0 N- N CO CO V 0 CO I� CO O O 0 x- N CO V V U) 0 I� CO O) AO cn x" V V V V V CO U) U) N 0 C0 L) L) CO CO U) CO (O co- co- co- co- co- co- co- 0 (O u. CI N COO CO V (N N O CO 01 N CN N- 00) CO (D CD N 0 I� CO N. MM Cf N- C) C) N LO) CO CO0V ' O CO I,: U) N N- N V U) V O (O N 0 M I- (O O U) O V O CO O (O N O O O O O 0 0 N- CO CO V N O CO (0 U) CO N O CO N- 0 V M 0 L) CO S- CO O 0 = N CO V L) CO I� N- CO O O N M CO V L) (0 N. CO O CI - V V V V V U) L) C0 U) 0 L) U) U) CO CO U) co- co- CO co- co- co- co- (O co- co- 0 F 7 I� N. O O U) O O CO CO N CO O N CO M CO CO N O CO M co h M CO CO C') O N CO 0 0 N. CO CO V CO O O C) O CO N- 0 CO V CO V CO N CO V N (0 0 0 L) CO (O (D r CO O O O O O O O OO O O O O O O CO CO 0 L V V V V V V V V V V V V U) U) V V V V V V V V V V V V V CO CO CO CO CO CO M CO CO CO CO CO CO co co CO CO M CO CO CO CO CO CO CO CO M E _ N ° d = m Q (/) N M N CO CO CO CO U) CO CO 0 L) N- CO N- U) CO Ix- N N N- O O U) N- N- N- J M 0) 0) O N CO CO V x- O CO O co V O (o N- U) N N CO 0 V V N O N- -1 N. O M L) co O M 0 0 O O O N N N N N N O O r ,- .- .- N N N N CO CO M CO CO CO CO M CO CO CO CO CO CO CO CO M >` U (O m C E a) m L • O IL O▪ D m N N N Z IL O CL CL IL O O O O O O O O O C) O O O O O O O O O O O 0 0 0 0 0 0 Z CI O O O O O O O O O O O O O O O O O O O O O O 0 0 O 0 0 0- O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O r- 0 N.. CO O O x- N CO V 0 0 N. CO CO O N- N M V 0 0 I. CO CO O N Q C .. _ 0 0 .y7.. n r . . U O C > T a) N _sft cO• O CO 10 u) .43 • CO COIll I CA O N N N ulili IM 1 1-3 f� r O O W W O O .- ,- N M CO 5 M.qg y -- - - - - - - - - - ,— - ,— c- ,— ,— N N N N N N N N CO N O g= O (7 O) N O (O O O O U) V N r CO ,- 0) N CO CO Cr) CO V U) U) CO U) CO 0. a ,- Vet O .- U) CO N V V .- .- N V V O O N U) U) CO M O N O O O O O O O O O O O O O O O O N .- O ,- O Z a U N 3 o J O O o 0 COSCOS > > a. 2 N( CO V V lf)CO CO N CO N- N CO O Ns. C Cr) CD O O C- M O O V r N O M CO CO ��(�` Q O O CO M `Cr U) CO N W O) CO V CO U) V CO CO M g VM U) U) V N .- V CO N V U) N- M V .- O CO N CO N- .- V N O V 0 ' N O (ID CO V N O N n U) M —, O O W !r O N- CO CO C) N- O CP O) (-Li CO CO Y O) CO CD U) V M (V O CO U) N- CO U) M N O CA CO N. n (O CO V M N Y Y E co C co co co M M M CICONNN NNNNN N LL O O 7 X N N N N - N N O E .N j U) Cl) U) CD U) CD U) U) U) U) U) U) U) U) UD U ) C ) UO U ) C ) U) U) U) U) U) N N 3 C- o C( CO CO CD CO (O CO CO CD (O CO CO O CO O (O O CO (O CO CO CO CO (D CD CO • LL LL ▪ w CO V CD r V V O V N r N- N Ns O D) O O co co co V CO N r O V N N CO O CA V V CD W N- CO CO .- .- N V CO CO V C� O O N N CO V V V V 1� V M CO U) M V M co (U CO U) V N W CO N O CO CD V N O C- U) U) O M O N T T O N UW O (O CO O U) O U) m V T V CO CO CO M COV O N U) O V a 0 C CO O 0) O O N N N CO M V V U) U) (O CO r- CO CO CO CO T O d .a U) U) U) (D CO CO co- co- co- co- CO co- co- co- co- co- co- co- co- co- CO O CO O r `�d- N (3) O (A W (p W (P m O a) W W O O) O (P m ca al 0) W CP 0) c Z co- U) U) co" co- co" U) co- co- co- co- co- U) co- co- co- U) U) co" U) U) U) U) U) U) l'.). C N O N U (5 'p U U N U) M N O CO W N CO O V N. CO O CO r N U) U) CO c- CO C U M O O N V V N CO U) CO CO 0 V V N- CO CO U) O CO 0) 0) CO CO O d a, w (5 N C) V U) 6 C- CIO O W O NN N . OO O O CO CO V N w y C) (U co V co co N- CO O O CO V U) O CO W O N N CO M V U) CO U N et a N N N N N N N N CO CO CO M M M M M M V V V V V V V V V L a, .0 O >O> 0 •O 7 N W j41) • J F E 2 (n O O CA n ^O N- N 0) COO CMO '- CO CO CO CO N N- CO CO V V CO 0) CO N Op Q (U (-CI O CT O CO M O CO CO V M D) (O V U) CO M O N W O_ M CC co O U) 0) V O) V 0) CO CO Cl CO CO N. N N. N N CO CO _ V n CO • N N N CO CO V V U) CD (p O CO CO q) CO O O N N M CLfn y 1- r .- .- .- .- .- .- .- .- ,- .- .- .- .- .- r N N N N N N N m Z 7 7 CC C �..L V U) M .- O O M V N. N CO a) M a) M (A V C� N N N- N- O O LOO O CO N- N- 0) M U) N U) V O CO N CO M CO CO O O M 0) (O V O) CO N CA (O M .- N V CO M M M N OO co N .- O CO CO N V CO '- O m N- CO U) V (V .- CO CO CO CO V N O N- CO N O O e- N CO V U) CO N N- CO 0) O e- N CO CO V U) U) CO N- CO O (a CA = O N- N- N- N- N- N- r N- N- O O O O O N O O O N O O Q o (n CO CO C� U) O V N. CO U) CO N- U) U) CO C- CO N- M CO CO O M U) 0 CO CO N CO N CO U) M N N V 0) 0 CO 0 O U) N N- 0) V N CO V r CO O M O V � O U) M N M CO CV O C) CO U) MCO O N- O V CO N 0 0)O CO r U1 U) V M O_ CO CO O V N U) a) O O CD O O N CO V U) U) CO n CO O O N N CO V U) CO (0 f� O W (O r r r r r N- f` n N- r N- CO- OD- W m N ao co- co- co- 0 ao aD ao ao 7 N O M U) O CO O N CO N- CO M N- O N N M N. O CO _ CO N- O Cs 1 0) O O O V CO N N CO 0) CO N N O O r CO V U) O N- N- n N- r N- C- N N. N- C- N. r O CO CO CA CA O N N N N N LV V V V V V V V V V V V V V V V V V U) Cn U) U) U) U) U) co co co co co co CO CO M M CO M CO M CO M CO CO CO CO CO CO CO M M E ca0 N co N a Cl) N- (V U) O O CO CO CO n U) CO N O (V CO N CO N (` U) V U) N Ns N J CD N O O O M r CO M CO CO CO U) .- CO CA CO N CO O U) CO U) U) CO Q O O O O W O O W O) OJ W T T O) CV D) C) V O CO N C- CD O) co co co co N N N N N N (V N N N N N M M M M M M CO M M 0 _ a) m C a.) 1,:,, _ a m (NI N N O Z W Cl LL U LL O O O O O O O O O O O O O O O O O O O O O O O O O a 0 00000 00000 00000 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O cL O 00000 00000 00000 O O O O M 0000 e- CO V U) O fN.- CO CA O s- N M V U) (O CO _CO O r N N ClV LO CO INC) O E 1� Ne N r N C� CO CO CO- W CO- CA CO- O CO N m CA CA (r CD CO CP W d 7 1114* c 0 N O C E• o m m 'u�i Z %Oil v0. in33o a', • • _ - CD . y CO x- a) V co co co co V N V O CO to 0) W D Ncoco M O v V (0 N CO 0) O N- IN C ,.AZ 0) 0) N N N N (O N O) O O O) CO 0 O 0) (V D 0) M (0 N. O N (N O V n W N In n CO N M V V V V 0 In 0 0 O (O CO CD N n N. n CO CO 1 Z `Iii ule M N N N N N N N N N N N N N N N N N N N N m O 1 Z O O N N 60 N M CO N CO O) (D N V (0 N CO (0 IT d( 0 .- (O W N N 00 V O V N V 0 x- ,- CO a) co U O O (0 (0 co 0 M N M M N4 V M (0 O4 M n O z E 7 0 V2 0 J O O 0 0 w0) Z.-. 0 a N (0 0 Y V' V Ca N O (D N N N T CO V N a0 0) O O IN a) CO 0 V CO �\ Z Q V CO N W CO CO O O N CO O N. O O IN CD (0 V 3 O) N- n O N a) I- coCO V 7 .- N O .- V M ,- co V O ' V .- CD (D M r N V co N O N M O M n co NCO in Y M M N N N N N N N N N COMM V V V N (0 Y Y a- — — — - - O O ct E E a (Nn al (0 0)) ((0 (Nn (Nn N. (0 (Nn a) a) (NI NI n (0 (N6 (N6 (Nn (Nn (Nn (NI of n a) N N a) .0 o A 7 (O O M co CO co CD CD CO CO (D CO CD CD CD CO CO (O CO j N N D _ 0 W (i LL F 2 W CO O V (0 N V O N 0) O CO CO O N. 0 CD CO CO CO CD N IN N a) CO CD CO N V C) CO (0 V CO N. a) co N. V O 7 V M N M M n N O N CO V O V CO V Gi O O O 0) 0) N O N- V M V M M M N O N C) ii O) N- 0) N V N- a) N (0 (0 .- V IN O M (0 n O N CO C O O ,- .- .- ,- a- N N N M MMV V V V0 (0 d L L ( N- N- n N- N7 N- N- I. N N- I- n n N- n N- n n N w a 7 6-, Ont N- 0) 0) 0) a) On) N- O) O) N- 0) 0) O) 0) 0) CD 0) 0) a) N. W Z wi (0 M 16 (0 i0 (0 N 10 10 (0 (0 (0 (0 u7 N N l0 N C O a) o U R C• d )p2 U y 0 _ 0) (0 (D O a) O) a) O co a) O N- O N O O 9 ` r O) V CD M n O O) (0 0 N 0) a- N 0) (O (D V: n N i0 (6 M a- On V O N- NO V O4 O w y d o y CO CO n n N- n n N- n CD O coCO N (6 V V co CO U d K V V V V V V V V V V V V V V V V V - Q N L N d V CS N J• F 2 Z to O W t O N- (6 CD a) a) N- a) V a) O co C) O N 0)n N V IN N. _ N- CL Q (a (O (O (O O V N V V V a) coM O N O O M n a0 (6 M V (0 V V V N n N M CL O a0 O N V co (O V N- O CO CD a) N V a) M co M V V V V V (0 (0 N CO CD CD CD IN IN N- n aD Q. N - N N N CV N N N N N N N N N N N N N N N cm Ca Z Z m m CO m c N O n M (0 0 CO O a) (0 a) O M M O CO OD (0 0) (6 co N N M r O CO N IN CO O N V a) N N 0 N O CO V 0 M 6 co O N a0 N V V V N O co M a) O N V a) n a) co .- N O NI CV N N NIC) ul a) a) 0) O O O O O O O) N was a) CO- CO- of of of of a). Of ac O of ai Of of of of Oi a O a N V N- Q) V O V M O) O V IN N. V IN N W co N co co CO a) co CO N- co co co (0 N- CO M OD N- (0 I- O M O OO O) n n N (6 n () N (O cd a) (a CO V n O N V a) co O N V 0 CO N- CO CO CO a) aD co 03 a) O O O O O O E 6. of of of of of of of Df ai of of of m of of ai m Oi 0 a0 O O O O O O O V N N- a- (0 0) N N N IN CO CD O O O O O (0 O CO (a 0 N- 0) IN 0 (0 CO O n N M M V O N V V V V 6 (O n O O O N (0 L (0 (0 (6 (6 (6 r 7 co co co co co E N .-,. R • 0 N a 0 a) V CD aD N- V N O I� N- M CO (D W N- CO CO Q m- 0 V n (D M M (- ,- N V 0) a- O IN (6 O N Q Ob 0) V .- V 0) Mn 0)) O V I- 0) M co (0 V V V co V (0 (0 u) CO CO N.- N- OD OD CO OD a) a) 0) T c) N C .� C '-' L L L L L L L L L a m 5 5 5 > 5 5 5 > > r L Q Q E E E E E E E E E t p u- N N N N N N N N N N Ti N O 2_ m N N N a < < a a < a a a Z LLL O N N N VyV (D CO 0) 0) CON.- O (O (6 .- 0) CO n 0 N. aOV O co yO NV NV M (0 co co M (n (6 7 (fV 7 (0 NQ. 0 AN M (6 t6 (6 AO ND l0M 16V KV AW O O O N O N Q. V IN OO OM OD Oa) O N OO OCD (7) CN O (0 O N 0 CO O N 0 N. CD (O CO 0.N. O.IN 0.IN 6 IN O. CO O.CO 0.CO O.0) C 0) a) O 0 O a- a- a '- a- 0 0) a0 rn :+ m 8,f, of 43 of 8E, a; y of yof yof yof y m a o 0 0 0 0 0 o v L = Y c c c c c c c c c n 4 O.V O C T O d N d 7 O li°001011 U a u) o Cl) N • 4110 O N (A (O (") O N CD CO C) N- N N O (O (A N N O C) W O N C CO O M P 00 0) O) O N- O 0) N- N- CO r O O CO O) V N N CD C) O OD CD C) 6) OD CO C) N O) N- N C) O) CO CO V (N CO C) N V N. O C) N CO a- cr CD C) N CD CO O M 1� O CO CD CO V N- 0 CO CO O) O) O) O O O O a- a- a- .- N N N CO CO M V V V V In LO CD CO ',I 3 �� N N N N N N N CO C) CO C) CO CO- C) COCO C) C) C) C) CO CO CO CO- C) C) C) co6 m N ciO a= m co aD CD V V O N N. C V O) O N. .- V (O N (A CD C) a- CO CD N CO V N d C) CD C) - O CO V O O .- N (A V N. C) O N N- CDCO a-a- 0) O a- N OD CD O CN V V V CO 6 V V O W N- N- C) W V V - C) C) D C) N N- D o ,- .- - OQ N U d2 0 J O o o O N N 3a 1 V V N .00 3 Y V V n /CD CO N l0 CD (D CD O CO 03 O CO N CO CD .0 CO C) CO CD 1` CO O O CA a- V CD G a` Z Q O 6) CD CO CO N N N.(N CO CD (D N- 00 V (N co CD6 o (D OD CD 0) CO CO O1 V n co O) V co co Q) co co O W O) V C) co co O) co(O co (D O N N W W CO V' 0 . V V O (n C) (N V N- O O W N- M OD N V N (O OD 6 C) V 6 V N6 N N CO CO Y CDr-- CO (A O O N N O O O) oo N- CO CD CO CO CD CO CO CD co N Y Y E co C ,- N- N N N NNNNN N N N IL 0 0 7 �' N N N N N N N N N N N N N N N N N N N N N N N N N N N N N (U E y co co CO (D CO co CO CO co (D CD (D CO CO CD CO CO co co CO co (D N CD CO N co co TDN N ` C_ N3 c0 c0 c0 CD CD CD c0 CD (D CD c0 CD t0 (D c0 c0 c0 (O (O cD c0 c0 (O (D (O c0 CD li tL H W W N N. C) 1` O VN O C) C) N- V' V V OD CD O Cr s- N N V' V CD N O C) CO N O 1` Cr N O O CD CO Cn N O O (A CO N C) CD CD CO OD N N O) C) (A CD O CO CO CO C) CO (A O C) V _ V CO (O CO V O N V CD 0) d (A CO CD N O OD (D V C) CD OD V N (A O N N- CO OD V N .- 6 M C) 'O p) V 1� O C) (D O) V N- O M CO CO V CO O) N CD OD V 1` O N (D Co C p C CD CD co co CO co 1` N- 1` co co co Co C) O) 0) O) O co _O N N N N L L x )` N- N- N- N- N- 1` N- N- n N- r N- N- N r N- OD CD OD OD CO N OD Co N CO- ii N .t 0 N- N- N- N- )` N- N. N- r N- n N- )` N. N- r N. N- N N- N- N- N- N- N- N. n Z 7 O) 0) coC) (A (A (A co) O) (A O m (A C) 6) O) (A (A (P O) CA W 0) (A (A O (n re Lo- CD CD CD (O CU CD CD CU CU CD CD CD N U CO CD co- CO co- C) CD CO Cn CO d C p C N hi C)cll R 'p C a y 7 .- CO N V CD N- CO N. O 0) CD 0 O CD Cr) N r O 0) CO C) CD W C) O y N- N- N O) a- V N V CD a- CD N O O V 1- (O N. C) CO (P V1,- O O V CD V N N V N- N CD 6 V V (O O V W (O (D C) r V V 0 r N V 1- O o w w N U N N O CD CO N. N- CD CD CD CD CD r N- N. CD (A O a- N l.) N d' T (6 V' V 7 N? c? C) M C) C) M C) C) M C) M M C) V i V V V V V V V 'T 2 o oL m a r z 9 1 J I 2 Z (n O W .3- o N (T (A O V COCO r CO CD C') CO C) V O O V O CDC) N C) OD N C0 Q CD C) N- CO CD O _ .r) CD CO VCO N. N O CD (n O N OD V CD CO O V' a) W Co CO N O) OD (O V N O W N- 6 W (O N r CD OD V N O) OD (O CC CO CD 0) N CO N- 0 CO (D O NV N- o M CO OD a- V 1- W V O C) CD _ N- OD CO CO C) CD CD O O O O N N N N CO CO CO V V V' V (O LO CO CL N N - N N N N N N CO CO- C) C) co- C) C) C) C) C) C) C) C) C) C) C) M C) C) coC) m 2 z 2 cnm c •.L (D C) .4- CD CD V CD CD N O Cr N O o CO CO V CO V N 1- CO N. W C) Cr CO C) a- CD O CO OD O V CO O CO CO CO 0 0) N CO CO CD N (D N M N- 0 N V (0 N6 N- N- N- O CD CO C) V V CD CO CO V V N C) C) M M C) .- ,- O O (T CO N- CO V CON O N- N V N (A CD O CO CO C) O N CO .- ,- _,- ,- ,- O O O O O O COO O O O O) O) 0) 0) O) O) O) O) C) C) CO CO W N - coO O co co W co- co co- W co- co- 0) W m co- co- co- co- CO OD co- co- co co- co- OD a o — co N- CO O co (D co W (A CD V CO CO V Cr O N CD O CO CD n M N. (D (A CO V CO CO M C) CD 0) CO CD CO CO _ CD CD CO 0) O OD O CO C) N CO • (A CO N N- O N N O O 6) O CO (A O) O OD CD 1- r OD 1- n OD (C1 CO N- N- N- CD CD CO V CO N (A CO r CD CD CO V N a- O CD CO 1- CD (D V a- 0 00000 O O O O CD O (A O) 0) O CO- D e (A (ACD- O) CD (U CA 0) CD (A CA 0 0) (A (U (A (A CO 0) (A (U CO OD (ll N CO- CD 2 W 0) CO V C) CD CD CD CO CD O CD O CO r N CD V OD O O C) N V CO V CO V CO a- CD 0 N N CO 0 V 0) O 1s V CD 0) 0) CO CO CU CD N CO Cl O O V O 0 in 0) (O CO O N- V (D C) O V O (D (D r N- V N 1- . N N N a- a- a- N CD CD (D V V V V CD Cn CO CD CD C() CO CO C) C) Cl C) CO Cl C) C) C) C) C) C) E 0_ (NO m .N 4 i co 0) CO CD N Cr CO 1- N CO N N- CO CD (A CO O CD C) N CO N- CD CO CD C) J V0) CO CO CD CO V CD N N CO CD C) = V OD N 1` CO r O CD W N- CO Q CO V CD 6) V r OO .-: O6 CD a0 N- N O) CA O) W T (A CD CO CO {p co co co 0) O O O .- '- .- co O O O O O O O O O O O O O U T V N m -F, C �. E -a U .c O l LL N N N I O E CON N N Z Cl d lL CL (L O co C) co V V N O CO N V O C) CO CD CD CD C) O O CD V N- V V CO CO CC C a C) - (A N co V 0 (O CO - a- O) C) (0 CD CD C) CO CO CO CD CO CO CD CO COel es O 6 O6 O6 O O O O N O O O O W 1- r N O W O O O O O N CD 0) N CD OD V 1- O CO CO 0) N N CO O V n V CO O CO CO CA r- N N N N C) CO C) V V V CD N LO CD CO CD CO 1� 1` 1` CO (O CO O O 0) O O O O O O O O O O O O O O O O O O O O O O O O O O O O T co .. 2 y .- r r N. C 7 o C T 11 2 E :' N N N 2 N jN141k cp.) am33o v') N - ■ O) O) N- N- O V O CO M M _ V N N- IN CC) CD CO (0 CD N- I` CO CO N c- O LO V N O O (D N IN V CO CO CO M N CO CO (D CO CO N- m O V 0) 0 '■� 0 N (O V V M Co Co Co N6 N N . O 6 M CC) O I- N4 V C- O) OD -co N CO CO .- V I� O CO CD O N CO CO V N. O CO CO CD 3- M O N- O LM CD CO CO r- N. IN CO CO CO CO CO O) O) O O O N N N N M M M m `W O M Co Co M M M C') C') 6 M M C') (h V V V V V V V V V V V V V V 3 O co a0 m O co CO co O CD 0) O (D N LO N h CD CO N CO CD M Cr O N- N CO O CO V V Q .d -O 0) r 0 LO Co M M N V IN 0o CO (D Co CO N CO N- O V W W .- N- Ln N 0_ N M LO N N Co M N CO N O M O V Co LO M (O (O N6 6 LD L() U Q m y r r r r N 2 0 o p o 2' n 7 CL 1 N C6 Lv!) j y 9 N CVD CVD Z N O) 0 O V o o CO CO LD (O o O V CO CO V CO N3--Co CDCO LO V I,- /�� CO M N. V CD N CO CO CD 00 O CO N- CO CO CO N Co CO I. N V V O CO M G 3 Q O CD I- .- (` f` V O N LO V 00 ,- I` LO N CO 00 N. CO m N LO LO V CO m CD 0 Y CO CO LOO 0 CD CD CD CD Co COO LO V CO (D (D N O 0) N M N O CO N- ) CO(O N Y Y E LO '- ,— ,— ,— ,- .- ,— ,— - ' ,— ,— O o 0 0 0 o O co co CO 0) LL 0 0 3 d' c = N N N N N Ni- N N N N N N N N N N N Ni- N N N N N N N N E V) N CO U) CO CO LO CO N C) CO C) CO CO CO C) CO C) CO CC) CO LD CO CO CO LO CO N CO N N N ` C 0 IL M, CD (O CD CD CO (O (D CD CO CD CO CD CD (O CD CO CO CO CD CO (D CD CD CD CD CD CO LL LL F- 2 W 1i CO CO O CO N LD V N (` 6 CO N 0) M N- M LO V V N- V '- OD OD ,- O O N M CD V O M o CO CO N. CO V M o 0 O O M V M M N O) O CO M N- CO O N CO O (3) V V CO N- LO O M M CA M O) G) V M N , O o O s- O W I- V N O) V co Co I- n CO Co I- CO M U 0) V N- O co Co co N CO OD s- V CD 0) N CO CO M CD N O N V CD 00 O N C M co co V V V V LO N U) Co CD Co co N. r I- co co co N W O) Cr co 0) O L L = CO ooco- CO co- co- N co- co- CO co- co- CO co- co- CO 0 co- co- co- ooo co- oo co- OD 0) a, in .t N n N- N- N- N- r N- N- I` N- N- N- N- N- N- N- r I` N- N- n N- N- N- N- N- N- z, co co O O) O) O) 0) 0) co O) CO 0) co co co 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) rZ lO CO CO Cn LO LO LO In CO Cn N CO t0 Cn CO tO LO CO LO C) Cn CO l[) CO LO to co O ▪ m O 'O OU VN N 7 co O A M CD o N V M CO o CO M O) l O W O) O) M V O o LO M (O LO ID C (D O D V N- C` N CO CO N M r V N n N IN C` M W CO co VGwd U O O 0 M .- O O C C O N 1� V Co M V r-: (` O M o N N O O O O N Co V CO N- CO O) N V CO CO 6 0 y N V V V V V V V V V V V V V V V V V V V Ln CO CO O CCD O LO Co N L a 0 a J 0 Z (7 ( wO t O (o I- Co C) N N co N O O O V N 0) CO CO N CO o N- V N CO0. V CO CO CO N V CD N Co N CO O) CO O CD M CO N O CO V U) V V N O W N CO Co CO O (O W O O O N W OD CY O co Co co N CO co V IN O Co CO CO CO OD O CO CO N. O .- V CO I- O) CO (O Co CD N. N- I- 6 co co W O) O) O) O O O N N N N N N CL Q) Co Co Co CO CO- CO Co Co CO. CO. COCO CO Co V V V V V V V V V V V V V m Z z 2 c as c LL Co N N O N CO N- 0 Co N 1� 0) N V O o N CD O O N- CO CO CD Co N Co O N CO o CO O 3- LO M CO - ti N N- V 3- V N CO CD o V CD M CO M ✓ CO W Co O CD W o N CO I- O N CO N- N OD LO V CO 6 V OD Co co O) N- (D CO CO V) V V CO LO CO LO CD CD CO CD N- N- CO CO O Co V CD N- CO 0 N CO N CD 00 CO OD CO CO O CO CO CO N CO CO CO CO CO CD T 0) 0 0) 0) 0) O) O 01 y Os fD N CO LD N W O O N tD OD N N N tD O O CO m aD N M M W (D a0 O) O N 2. I- CD Co V CD Co M I� CD CO CO CO V V CD O V CO Co N- N o N. CO - V N- co LO N CO I,- O CO V 1- N N. N T CD O N- CO N CO W CO 03 O co O) O M OD V Co Co V I- W N V I- W N CO N O co O V CO N N N V CO co co (NI , •- N N N N Co CO V CO LC) N- CO 0) r N V CO CO O) 0) 0) 0) 0) 0) 0) 0 0) 0) 0) O) O) 0) 0) 0) 0) 0) 0) CO 0) 0) 0 0 0 O O 0 O CO- N OD CO- 0 CO 03CD COODCO N 0 OD 03COID CO COOD OD CO O CO CO Cr; N N co co CO N. N r CD CO CO co N CO CD CO N V CD CD CO CD CO 0 N- CO M 0 V V V N 0) O O N- CO V N. CO CO CO N N- N n CO CD CO 0) o Co N- V Co N N N N V N N V O OD Co V N (D CO M 0o CO O CO O L CO C) CO V V V co co co co co N N N ,- N Co Co V Co CO M CO Co Co Co Co Co CO CO Co co CO Co Co Co CO CO E N _ 0_ co N a (I) Co O V O M N- O CO CT CD V CO N- 0) Co N. O N O V 0) co o co N CD V J N- O N. 3- N 0) 0) V CO CO 0) 0 N CO CO N V CO I. N O CD o N JI- 0 O) CO 6 6 CO N V CO CO 6 V CO N- V6 Co 6 W O O O) O O 0• r W 0 NCO CO CO CO CO CO CO CD CO OD N- N. O COIN CD ( CO CO CD CD LO O >. U .-. (p N m C E N N a L • O a -0 LL. Ni N N O IT) N N N Z It D LC L.L LL OD CO CD co N ,- CO O CO CD CO 0 CO N 0) V N CO CO N V CO CO N. CO Co N- Z CI CO N N LO N N M CO O CD V) 0 O CO CO O CO o N. ,- (O CO M CO o CO CO O O o O O o o O O O O N N N O N Co N O M CO e- N CO 0 V ! O .M- N C N CO Q) V CO V 0 coco, coCD N. CO NN.- 0) . O O O N N N N CO M CO V V co,V CO LO CO O (O CO (o N 0) O a- a- a- T y R 41;.- O4.bi c .. 8 T M o c ♦NIl ' O CL U) O Cl) N LO • • 03 III III ( 10 ill fig_ co s Ell , 2 ii. 'f O I g I Qam) 3 o Q O O o N N o — 3 3N (L CO 3 Y (COOS CO/,O�S� > CO G G 3 Q O U Ca N Y CO E La m rn L O O E N W Lo C N N 3 C o W "" O CO (L lL H W 0 N 2 CO L U) Q) U ii O) co m C o C O 2 0 ,V CA m w d _ Cb Cb co L O p N = d '- Y c ca ui U s O U V d U N c m m w N y ui U• m Ce a R (_ o 0re _ cp V) ci 0 r « J 2 2 (n 0 W - () i.,, -)3 M O) 0 6 O VIf Q Co d N 0m w N M m O. a'i co L o EEEEEEEEE To o "O -O -oU D -o U D .. N N N N N N 'Dm N C CO m N N N (0 (5"03 (0 CO (0 N O -O o O a Q O. °O_ n 0C1 C. 0_ 0_ 0, (N C O) O ci_d O N U) N N N N N N N p a a p N 0 H Y C C C C C C C C C a N CL (0 - - 0 6 CO O CO O) O N _ W V CO ,- M (� W 0) 6 N- O N 6 (O 6M .- 05 N ,-- o n n r gvo Ul E vvo vgvvvvvco NNW co y + O co L 7 O U I R CO N- 6 CO CO 0) N- CO V CO O V C CO CO CO N V I"- (` O r CO O N OJ Cl O O M N- CO CC) M N Cr) M (D CO O N V CO CO V N.- N (n F co M co V V V V V 6 c0 6 M L 0 Q Z 0 N N N N N N N N N N N V `) + 7 M E N ° osd co •N 4 ( V I- O) V O V M d) l[) V CO CO M a0 (O O O I` M N (7 L M I- O M (O a0 0) N- r N 6 N C/) V U c_" V I- O N V CO CO O N V CO Q N O. W O O) O 0000 - - - - 0 _I 0 ; �, co CO 0) O) 0) 0) 0) 0) 0) 0) O) 0) U TO C N U a 0 N 3 ..- C E N W rico 0 0 0 a) CC, R V 00) N (() COO 0 Q O (i 2 L O V ari iri (O (n (Ci (Ci ri V 4 O L -O (L N N N 0 ` 7 e O V N. O co CO 0) N CO 0) N M I- N0. N COCOON- n C` N- CO WOW 00` NNN Z 1 (i (i L « m y p co- rn rn rnrnrnrn co rn co- rn iOO M O Ln �i y c°-r 'o pOC -v< a" ° c o m a m m rn OE 2 «: m m a 7 m h C.) o. in 33 o m a N • . 2 Northing(250 usft/in) elf 51 N h N N h N N N N N h N N h N 23 N N N N M� 656500 �- '`__.� ro - +656500 N O m N C 656250 Q LL N�QO N co N 656250 65600011 LL - w LLl LL •aa.. -_- .-. -__... Hog N_ N- LL - 656000- 655750. LL LL , .-...... _. .-.- _.-_ - ---._. 655750 ;c0 655500 X000 '000 _- -.__ _- _ +- - 655500 ,_ ,_r> 655250- LL ,. u'_ _..655250 gg 655000 - LL .. _ 000 _ +655000 13= 0 m e 0 e 654750- LL < •• {654750 oeo cico c7 „Q 0 i!'-'41 c a r 654500_.. ' s'- ' y O O0 654500 3LL WLL'S O> LL • '1 Wil _-_ Q i -654250 u ��m 654250 -_.. O '600 �_ vlco O ,. 0 a 00 S v 653750 ..- - --_ -.r �� .=7�. 0 `654000 _; m 0 00g .p1 p 654000 -� a8"' 0 0 v - - a hp .00 :. - .__ __.F653750 g m o 0`''' 653500, 0 - o tip 0p0 op --- 653500 o o 653250 coo o\ LL 853250 I�r--' O` mop E,, ,p •..' 653000 --- - --- �� C� 0 -653000 gi o 652750 g ic: =♦ -.-652750 LL -o /� ^652500 -_ _ _o _-.0- Lo —,�►'��. -- r o��� p --652500_ V LL o ._I 0 0 0�s b CD N O n C N O � c F Z y 652250 o rn ! 00 .„ -652250 4 Is a 652000 LL N o L 00 652000 0 N LL Od N 651750 %N o - 651750" 1.-! !it'll 0 p mLL or 0 c �J ® 651500 -_m -- 0 - - -.- -._ - -__-651500 m of 00 ol . 'oAl IF, � ) W 651250 -ALL o QPO O. 651250 w 4 u V' L`.N co 0 o `� O 651000. LL LL _.. �.. . ..- 1651000 00 U 650750 : _ ... :_. .__ - ,650750 650500_ N 0 0008 -- :650500 0 LLp0 t 650250 ni d' 10 - -- - - --- 650250 ,/ LL 09 h 650000- < _ ___- --_ ---_ _- `650000 >. N u 649750. -_. ___._ _.--- _ ..- __-__ - 649750 e m 'm v 2 ga` - - 649500 __.. -_ . .•:00 649500 •Lci 2 ,.�d] 00 J e rn. 0�-. :.. - _.:._. .-._ -___---___ --__ _----.. --_. 649250 15°�°°� ut _ 649250 o�+3a.• i y 649000 Q '4" C N 1649000 648750 N - -648750 648500 csir_._.. _-._. _._ __._--_- - -_IK -.- _-. _._._ -648500 U. 648250 ' __ ___ __-_____ --._ r0,1. ____ .--._ __.[648250 648000 ,a: �, 1648000 647750 " - -.-. _. __- -_. -._- _ _--647750 LL (�\j 647500 N- --- --- - -- - --- -.-Y647500 iiLL.... 647250- - 1 647250 3 0 8 . 8 8 8a r O 8 8 8 <, 8 R 8 <, 8 8 m 0 v .n Ln In Ln .n in Ln .n Ln u, to LO v, LOuO v, (ui/Usn 052)Nu!gpO.; LL • • 0 bp North America - ALASKA - BP Prudhoe Bay PB F Pad F-22 F-22A F-22A Anticollision Summary Report 25 May, 2017 BAKER HUGHES AOGCC Report • e.°C • BP HIM 1� by • Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-22 Project: Prudhoe Bay TVD Reference: F-22 OKB @ 64.54usft Reference Site: PB F Pad MD Reference: F-22 OKB @ 64.54usft Site Error: 0.00usft North Reference: True Reference Well: F-22 Survey Calculation Method: Minimum Curvature Well Error: 0.O0usft Output errors are at 1.00 sigma Reference Wellbore F-22A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-22A Offset TVD Reference: Offset Datum Reference F-22A Filter type: NO GLOBAL FILTER:Using user defined selection&filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 5/25/2017 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.04 9,600.00 1 :Schlumberger GCT multishot(F-22) GCT-MS Schlumberger GCT multishot 9,644.00 11,796.97 CTK MWD 4-1/4"(F-22A) MWD MWD-Standard Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB F Pad F-05-F-05-F-05 4,302.27 4,650.00 149.04 66.10 82.92 Pass-Major Risk F-05-F-05A-F-05A 4,302.27 4,650.00 149.04 66.10 82.92 Pass-Major Risk F-05-F-05B-F-05B WP11 4,302.27 4,650.00 149,04 66.10 82.92 Pass-Major Risk F-10-F-10-F-10 4,640.86 4,775.00 470.63 99.43 371.53 Pass-Major Risk F-10-F-10A-F-10A 4,640.86 4,775.00 470.63 99.43 371.53 Pass-Major Risk F-10-F-10B-F-10B 4,640.86 4,775.00 470.63 99.43 371.53 Pass-Major Risk F-10-F-10C-F-10C 4,640.86 4,775.00 470.63 99.43 371.53 Pass-Major Risk F-10-F-10CPB1-F-1 OCPB1 4,640.86 4,775.00 470.63 99.43 371.53 Pass-Major Risk F-11-F-11-F-11 5,282.31 5,350.00 152.63 127.34 40.33 Pass-Major Risk F-11-F-11A-F-11A 5,282.31 5,350.00 152.63 127.34 40.33 Pass-Major Risk F-11-F-118-F-11 B 5,282.31 5,350.00 152.63 127.34 40.33 Pass-Major Risk F-18-F-18-F-18 3,473,06 3,700.00 397.96 61.90 336.18 Pass-Major Risk F-18-F-18A-F-18A 3,460.37 3,675.00 397.80 61.64 336.22 Pass-Major Risk F-18-F-18AL1-F-18AL1 WP05 3,460.37 3,675.00 397.80 61.64 336.22 Pass-Major Risk F-18-F-18AL1-01-F-18AL1-01 WP07 3,460.37 3,675.00 397.80 61.64 336.22 Pass-Major Risk F-19-F-19-F-19 3,343.03 3,550.00 120.29 61.03 59.33 Pass-Major Risk F-19-F-19A-F-19A 3,347.15 3,550.00 120.44 61.12 59.46 Pass-Major Risk F-19-F-19B-F-19B 3,336.08 3,550.00 120.50 60.89 59.62 Pass-Major Risk F-21-F-21-F-21 3,592.03 3,600.00 57.88 56.89 0.99 Pass-Major Risk F-21-F-21 PB1-F-21 PB1 3,790.75 3,800.00 54.63 54.04 0.69 Pass-Major Risk F-22-F-22-F-22 9,910.65 9,925.00 48.11 14.33 34.28 Pass-Major Risk F-23-F-23-F-23 3,296.25 3,300.00 134.51 52.88 81.63 Pass-Major Risk F-23-F-23A-F-23A 3,296.25 3,300.00 134.51 52.88 81.63 Pass-Major Risk F-23-F-23B-F-23B 3,296.25 3,300.00 134.51 52.88 81.63 Pass-Major Risk F-24-F-24-F-24 1,417.21 1,425.00 229.54 26.52 203.02 Pass-Major Risk F-24-F-24A-F-24A 1,417.21 1,425.00 229.54 26.52 203.02 Pass-Major Risk F-24-F-24APB1-F-24APB1 1,417.21 1,425.00 229.54 26.52 203.02 Pass-Major Risk F-33-F-33-F-33 1,270.63 1,275.00 160.70 20.95 139.78 Pass-Major Risk F-33-F-33A-F-33A 1,271.73 1,275.00 160.73 20.99 139.76 Pass-Major Risk F-33-F-33APB1-F-33APB1 1,271.73 1,275.00 160.73 21.00 139.76 Pass-Major Risk F-35-F-35-F-35 3,320.62 3,325.00 49.68 54.35 -4.67 FAIL-Major Risk F-35-F-35A-F-35A 3,320.62 3,325.00 49.68 54.35 -4.67 FAIL-Major Risk F-42-F-42-F-42 2,845.58 2,850.00 204.95 42.24 162.71 Pass-Major Risk F-42-F-42A-F-42A 2,845.13 2,850.00 204.93 42.23 162.71 Pass-Major Risk AOGCC Rpoi 5/25/2017 4:55::42PM Page 2 of 3 COMPASS 5000.1 Build 818 • BP S 4.I 0 bp Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-22 Project: Prudhoe Bay TVD Reference: F-22 OKB @ 64.54usft Reference Site: PB F Pad MD Reference: F-22 OKB @ 64.54usft Site Error: 0.00usft North Reference: True Reference Well: F-22 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-22A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-22A Offset TVD Reference: Offset Datum Reference Depths are relative to F-22 OKB @ 64.54usft Coordinates are relative to.F-22 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones,NAD27*OGP-Usa AK Central Meridian is 150°0'0.000 W° Grid Convergence at Surface is 1.17° Ladder Plot 600 _- I • • J J J J 1 J J _. I I I I I I C I I p I I I S'450- __ k I I 1 I L -I-CD .-... [hl 'r 1 1 � C _ _J___- '-_ _ ___ It ' J J J J I_ ' d Q I ir, '. Ii, I I 613 300 _ L►' 1� I I 1 - I I N eyed ILtI1I ,i I I� I IO Kai4fy _J J Jo Lm150 I sa6 � I I 1 I f..s ry.e_.,pes.saY - r w�vvc�-v-r�-•Nr1-rr1-v-rw� I I 1 I I �° iE✓�dd�eAbAewsal6�i�E.s.��,lv'i� I I I I I I I I I 1 I 0 I I I I I I 0 2000 4000 6000 8000 10000 12000 Mea Lred G EpN_(2000 usft/in) $- F-05,F-05,F-05 V6 -A- F-18,F-18A,F-18A VO -a- F-24,F-24,F-24 V1 -A- F-05,F-05A,F-05A V6 F-18,F-18AL1,F-18AL1 WP05 VO - - F-24,F-24A,F-24A V0 F-05,F-05B,F-05B WP11 VO F-18,F-18AL1-01,F-18AL1-01 WP07V0 - F-24,F-24APB1,F-24APB1 V0 -0- F-10,F-10,F-10 V5 r4-- F-19,F-19,F-19 V9 $- F-33,F-33,F-33 V2 -e- F-10,F-10A,F-10A V1 -- F-19,F-19A,F-19A VO il F-33,F-33A,F-33A VO -r- F-10,F-10B,F-10B V2 F-19,F-19B,F-19B V0 F-33,F-33APB1,F-33APB1 V4 -9- F-10,F-10C,F-10C VO . F-21,F-21,F-21 V1 -e- F-35,F-35,F-35 V1 -F F-10,F-10CPB1,F-1DCPB1 VO -0-- F-21,F-21PB1,F-21PB1 V1 -B- F-35,F-35A,F-35AV0 -F F-11,F-11,F-11 V4 F-22,F-22,F-22 V1 X F-42,F-42,F-42 V6 -A- F-11,F-11A,F-11AV3 -1- F-23,F-23,F-23 V1 a F-42,F-42A,F-42AV4 AOGCC RcpoltCOMPASS 5000.1 Build 818 5/25/2017 4:55:42PM Page 3 of 3 • 1111 04 1-1 L N 0) " `7I W N c aa J Q C U) a . N. a ❑ 2 n n O p :',4'" IN ~ w 0 0 O 0 N O) W ° 0 1-1'3 It?) _ a o a C I U' a) �„ 2z8 w c, 1_ Z c (13 < W 0 ❑O ei UU U U 0O X0 r- O -� N v E- Q CO m Q CO CO o N N N Z iq y0 2 .N 0 o a U o o w n na) E a)n 2 0 a wo 0 oy N O ° da w 0 0� W .-. O -7 2 N 5 N o u o f/� aD 3 U c- O .- U) O f,�iJ O x N UI +,', a) ao u)) a c c v c m x a) 1. n C N N 00 O N O .. X o ,l In 3 W co _ ❑ E N0. < X a) c 0 0 Y6 O N j -0 a) a) o a a 0 n= 5 m c J o a ; o `I o. o a) co o a a a U m E ,'r. U tr.) Q o po } H 0 n I— N U7 V ', r o N O )p �N' 0- t N N .-. Qj C /i% E c N N .) 1a. " N JV n ai m <o n _ > a a Q a c c �} c O) N C N- U) 0 0 Wi tr U7 w w iZ m .'O c o_ a U) > n > N a 3 :; y a)) U Z o m E E di. .co Q N a^o �W ❑ Q ❑ W W to a > U E E I u7 C a) ❑ w O i y O a) Z _� O N 0 O p N U) m rn p 1 N U N Cl) 0) O) 2) d O Co .. u. a a o_ -- N U) CO co u) O a) U' O N U O) W U) 0 j N E. CO a •• Z O O O n a .U) N 3 a) O) 0 (O N a0 O 'O cu W a c E -0 E c Z > 0 0) LL I Li m o) '� f (O " _ _c co u0Ocw Q Z VJ YQ PI °-aoo Z H O of : t � O 0Qz ❑ aO E:LtiC w a d ;II'A A Z ( J < W W 8 y: QO a7UQ Wf U Z a' Z w r0 W W J z O 0 ZLu 0 W )O/) = / 0 g O 0 U >- v w Q • J ❑ M w < l o a Y y 2 0 0 c 2 0 )n pp LL 01 0 ") U a' Z W W Co N o "N S JQ co a -- =' U a o N 0 o E a.i m O Q %%!� W fn W E U E'0'- 47 rn N a' O - r a) 6W H -. N co o 0 m 00 a c O) ---(1.)-- - i* O • a) -0 .. Z < n a) a) 0) .. O 2 ui to E E E S °) u) c a o o U a a) 1= m a) ate) (1) . E U in O - H U .. N a) > U E n m Q 0) ... a) E m 0 n c c o a- 2 Z rT ❑ > o 0 .x c a) C a) a) ^2 . n UI F- U o 2 > O a . E w a) c3 .V 'O Z' 0. "O Y L -O U) ` 0 o co 000 co m a U aw 0 0:1 U v a w 3 u) a' •co cn 0 2 0 ❑ ❑ D O D O , "� °` ' , A' 3 'a Do E ��6Y,r ¢ m X I\1 To l6 J z d a H 7 = N N ., ,„ I a yl U �/ J co IIO „ II � 't d > N a _ > E co CD 0 a) 0U� Z Z U cg 1 CD I a ,g a) • o L a a - �>. 0 0) II0) (.3a, Ti H f IW o c9 - C I a x; I, N 0 E a) 1.' °D o m o a i1. ui ?,! u_ 41 m E 1 F- o U III � C a Z d F C l6 O (xp N_ a. r p Z co p C a o W C J m a tL A o m1Q X cn —1 1111 a c II x a 0,.§. E v -53 rn E Z Z N ✓ o d Y II Z m N N LL = a C N N G rn : N7 N J 44 w a ` O CfI I a-i Si m i, E a o 3 1 L , 10 ., to �, L m v a o `- a go % C m ' o co E d F c c m u) 0 C C d Zr r n- n y . a) o 2 v d . m a O .>> > n CL -o 0 .E. S m y w .a C ' g g' } -Cey 0 17) F zi ao z H OO o E u o� d c1) E TA < fE ;,./ a = o O cn COm m p 8s U) E 3 U c E 3 2 N- N Y 'i.: Hd ,_O F a N O IN U a �. ; CO • 74 mIU o t, 0 N N Z'E- v W -i 'D = a O in o. m m CO E a � Eg a z a 0 o cnn ace B 21 ¢ 1.) a� E zo m ,' • IIIx ova, -5 F- = r 2 C m Eo a 0 0 o 0 o - O = m CO N OD x a' a J .. C N O n l If w a H O = o a o mo- °P --E- H HF m cn m Q ,2 n z m f 0 ' wa ca ca c c o E a o 0 -2- Z = E .0 o J O 7 l0 7 �. c7 Zcn J > a U To g a U a w z Z Z p II o w m m -0 w . a .-. N -FZ F f = N W rn E 0Ca r i ZaoWy 61>.O uoi a , oID w C o N. N m �On U a V r E ' iZ olO m 1g . O. cs. 0 HII U Q < II (O N 12 ai oII CaTO = O • F N a a O • Et0 w N O II E os N C a7 C 7 7 O ° > o - a 0 - ao U a w U m e E o a a CO Cowo0 m f 12 1= 0 0 CO O 03 F = RECEIVE. • 2 1 s 16 3 3 0 4 W61111° JUN 19 2011 BAKER PRINT DISTRIBUTION LIST 2 8 HUGHESPlease sign and return one copy of this transmittal form to: COMPANY AQLQrr pion Alaska Inc. BP Exploration (Alaska)Inc. Petrotechnical Data Center,LR2-1 DATA LOGGED /24/201 WELL NAME F-22A 900 E.Benson Blvd. ivi.K.BENDER Anchorage,Alaska 99508 FIELD Prudhoe Bay Unit to acknowledge receipt of this data. COUNTY North Slope Borough LOG TYPE RPM:PNC3D BHI DISTRICT Alaska LOG DATE June 2,2017 AUTHORIZED BY Paul Canizares EMAIL Paul.Canizares(a)bakerhughes.com TODAYS DATE June 16,2017 Revision STATUS Final Replacement: No Details: Rev. Requested by: COMPANY FIELD/ FINAL CD/DVD FINAL PRELIM LOGS (las,dlis,PDF,META, SURVEY REPORT ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BO* LOGS CGM,Final Surveys) (Compass) PERSON ATTENTIONJ� #OF PRINTS #OF l'HIN I S #OF COPIES #OF COPIES #OF COPIES O 1 BP North Slope. 0 0 0 0 0 EOA,PBOC,PRB-20(Office 109) D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. 0 1 1 0 0 Attn:Ricky Elgarico ATO 3-344 700 G Street Anchorage,AK 99510 3 ExxonMobil,Alaska 0 0 1 0 0 Attn:Lynda M.Yaskell and/or Lisa Boggs 3201 C Street,Suite 505 Anchorage,AK 99503 4 State of Alaska -AOGCC 0 1 1 0 0 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas *** 0 1 1 0 0 Attn:James Hyun 550 West 7th Avenue,Suite 802 'Anchorage,Alaska 99501 ***Stamp"confidential"on all material deliver to DNR 6 BP Exploration(Alaska)Inc. 0 I 0 I 0 0 0 Petrotechnical Data Center,LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 Attn:Nancy Landi TOTALS FOR THIS PAGE: 0 3 4 0 0 RECEIV4D • 2 1 6 1 6 3 JUN 072017 28267 BAKER PRINT DISTRIBUTION LIST HUGHES AOGCG Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc BP Exploration(Alaska) Inc. Petrotechnical Data Center,LR2-1 DATA LOGGED /2011 WELL NAME F-22A 900 E. Benson Blvd. .BEN K.BENDER DED. Anchorage,Alaska 99508 FIELD Prudhoe Bay Unit to acknowledge receipt of this data. COUNTY North Slope Borough LOG TYPE GR-RES BHI DISTRICT Alaska LOG DATE May 23,2017 AUTHORIZED BY Patrick Rider EMAIL Patrick.Rider(@,bakerhughes.com TODAYS DATE June 5,2017 Revision STATUS Final Replacement: No Details: Requested by: COMPANY FIELD FINAL CD CD ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BO)] LOGS LOGS (digital/image) Surveys (Final Surveys) PERSON ATTENTION #OF PRINTS #OF PRIN I S #OF COPIES #OF COPIES #OF COPIES V 1 BP North Slope 1 0 1 EOA,PBOC,PRB-20(Office 109) D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. 0 1 1 Attn:Ricky Elgaricio PO Box 100360 700 G Street Anchorage,AK 99510 3 ExxonMobil,Alaska 0 1 0 Attn:Lynda M.Yaskell and/or Leonardo Elias 3201 C Street,Suite 505 Anchorage,AK 99503 4 State of Alaska -AOGCC 1 1 1 IAttn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas *** I 0 I 1 I 1 Attn:Resource Evaluation 550 West 7th Avenue,Suite 1100 Anchorage,Alaska 99501 ***Stamp"confidential"on all material deliver to DNR 6 BP Exploration(Alaska)Inc. Petrotechnical Data Center,LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 Attn:Nancy Landi TOTALS FOR THIS PAGE: 0' 2 4 4 0 0 TOTALS FOR ALL PAGES: 0 2 4 4 0 0 M • • CO e-- tO tO CNI r. CO N (NI 1111 W al m_ W 0 hien 4Z m 0 > N () a W o 0 CO V = 0 I W - ' < < CC C/) Q 't J O Q Q I W ca OC •v >% L a) E0- N = Q '' o U)m. w N II N _. • °in = a il N u.ERS O LL N C' `° N O N N .� a. Z a. LL LL 2 02 I.I.. `n N f • • a y - % kill z4 Z ® \ � \ \ / / { / .- ben S 1MI LO w •;',6'r w Cl) k < .. 0 V, } \\ \ \ _, _ ) \ \ m [ } / ) \ : . . - » § cE \ uuI uJ § 3 ± ( ! ] J : \ '- § A LO • 2 / _1 \ e. \ } & a) \� ) k5 § 2 k lc \ - a) � � .. 0 u % a & \ ■ E ' - _ LO _ C © _ . _ & § - o - tea a \ � § 22a LO\ 0 \ \ \ f 8 � / { <\ \ ° : y . co - CC 6 Cr I / k \ / « s } ^ i\ ; - LO N OD C & § Lu \ 0 k 5 C / C / zI � ; _ z a & . ) - f E o 0 -±- 0 z I- \coino « < co a ± 2 ° -c. a 2 - \ ( \ \ a ^} \ / ` \ i \ \ / CO)° } CO • % < < \ o = o COo 5 k 0DD ° . 0 < - < ■ § < CO ri o • \ \ � U. ƒ w & § 9 ■ < a ) i G R z & ¥ \ 0- R § § f $ ƒ - z 2 co J J I & » Q. nzo _ @6 : § ) § k 0. � E 2 .5 .5 ) .. ) ! K ( � fr. § 0 • #• 5 _ ) £ E a o � . a ƒ $ § 2 & 7 � 2 ( G o.u) a } £ A 2 2 £ ) & 2 . a J ; & \ . • • a la O O N O N 0) tO N 0) (D O N- N V N M O Cm O O N- V O r co N V co O (.0 c- CO 7 .- N- M CO CO. (O CO kU�� 6 O O O N M V N6 (O N- N- CA ) 66 O 1 ' 0 `Wa 6en kV M0 > m •?- o Q= o 0 COvi O M V N N N r OD M U) CO 00 CO M O CO O) 00 <,[ a O O NNO N N- '- O O 1- N- N- 00 00000 O o O O O O O O O O O O O O O O O O O O O O O o az H 0 NT 2 N a o O O p N (U = 7 LL N LOU)7 Y N O N CO u') CO CO N O V 7 r Cl. N CO r N V N c- CO O�1 OZ O OO M O CA r M CO N M r N r O N O N CO M CO ©© < O O CO N c- CO N- (D N O) CO M CO 7 r 0) N Cr N N. r U ' OO OO N- N. N- (D N u) N V C R 4 V V 7 C) N N N N NOD CO Y V V Cr V Cr Cr V 7 V V V V V 7 V V V V V V V Y Y E N IT (D co co co N co co N co N co co co co co (D co co co co co 1 0 0 7 tt LV N N N N N N N N N N N N N N N N N N N N N N N N ... 2 y ca N N N N N N N N N N N N N N N N N N N N N >75 N N L Q W co co CD co (D CO 6 co N N CO N CO CD CO N CO CD CO CO N LL LL I- 2 W O CD Cl. N N M N 00 Cr N CO UO CO CO (0 CO M V CO O Cr) CO CO r (O V (A CO CO O O N V CT) CO Cr CD CO M O O) CO Cr CO O O O N V CO N CO O M n N N N N� N Cn O W O r N- N N '' M N n- _ O O W6 f0 r N- N C •0• C N r 1"-- N` N- r n r n N- r C- N- N- N- N- N- N- r O� 2 t L x V Cr.. V 7 7 V R V 4 7 V 7 V 7 7 V V V V V 'U m 4) o V 1C-;0) IC; rn rn rn rn 0) 0( rn 6'; 1.,) C rn rn W W C) W 0)) m CL Z N N ) N N co- N co- N N co- N N N N N N N N N N C W O N N ._ C I,' N U A O O co N V CO Cr M CO O N- CO O n V (O CO (OE U 7 N O O ) MCOVOD — N r CO V N O N N N4- . Q d ` w N P CJ O O) O O N N C) M M M C') C6) M M N N N N (..) d d K T m E oCL o0 J rL 2 NN 8' 0 -O W 7 m a 0 c rn m co p ,' E ) o O U C) N N N M N N) CO C) 7 N O Cr) (O N Q V 7 0 o O ,- N CO 0) CO N N- N N N CD N n ' CO N W a) L O 'O• O O N M 7 N 6 N. N- 00 00 (A O O N CY (• c) 2 CL N N x m L 2 ! ,.:li � (0 C iA_ N co co CO CD N Cr e} CO M N N N N N N- Cr Cl- 'Cr Cl- V V V V 7 V V V' V V V' V V Cr V V CO CO N N N N N N N N N N N N N N N N N N N N CO I C') M CO CO co co C) CO M M M CO M M CO M CO CO CO M co U) N M V CO CO r CO 0) O N CO R N CD r•-•- OD CD (E a H a 2 2 Q >p N O U ~ F 0 C',. Cr) O O O O 0) CO CO h-. N CD CO CO (O CO N N N N N N M O O O O CO O 0) C7) 0) O CA m C) O) CT 0) 0) CO CO O) OD O O O O CT C) C) O) O) CA CA C) CT CP (A CT CP Q) CT m N OCr. N N M V CrV N CO N- 00 CD O 04 M V N N N CO m N _ U .. E• Q N O O N N N� N U) N co N CO O N CO CO M 0 N r O N N C) O O CO N- N N CO CO N CO CO CO. CO N 00 N- CO CD N O Pc LLL..i O Mr..: N N M6 (A O N M (P O 6M a0 O 6_ L co O O W rn O O N- CO N N. N N CD r N N ;Yc. N N N N N N N- a- N N r- N- a- a- 1- a m E TF N 7 'N 2.7 LL N- g Q .3 m 7 N OT s 2 Q Q N CO U Y D) CO N 7 •• I- O N O N M N O N CON- LOOLOINCD N- N N 00 CO N Q co (I) .- 0 O O N 7 7 CO n N N N 7 CO M M V M CO M N N M J O O O O O O O O O O O O O O O O O O O O O Q N O CO C6 O (0 co Qc.) >, O CO - O U :.mlii 11. b 0 • N .. LLNNrV N O ` m N N N Z LL LL LL LL LL o O aCA O O O O O O O O O O O O o O O O O O O O O O M O O O O 00000 00000 00000 O O• V CO O O O O O O O O O O O O O O O O O O O O DiN cri N O O O O O O O O O O O O O O O O O O O O C N M V N N 00 O O �_ CO (O N O c. O N G c N Q L a LL, '. 2 a C• .. — I() a ° C m m o E ai 'ui Z Z o d u ciO m33o U) rn CO Lo $ • • y N CO M 7 LO 0) co co co O 0) n CD LO CO 0) V '- O LO O 0) m CD CD CO 0) co M N CO O N V N M 6) LO 0) 0) N CO O N 0) CO CD CO W N CM V 0U 6) W O N6 6 6 .. N6 M V V V' In O V 'p kV igi N CANCAN N N M M M M M M M M M M M 111 S1/41U CC • an m WU� �� j co o 0 co O LO O V O CO 00 LO O CO CO CO LO CO CO O CO CD CD n O 63 7 O) n a N- .- .- .- = 0 O O O M O O ONN N O O .- CO O M OO o O O O O O O O O O O O O O O O O O O O O O O O O O N o Qz w U co U.' m a 00 o o CO U) J J LL V V N (f1 LO j Y l0 N co LO co U) N N CD N CD CD 00 O CO 0) V CO CO N N (O LO V W n N CO p'p� N N N 0) OD CD O N CO CO Cr O 0) CO V CO CO r N n (0 CO r N N N ©© Q N r co 7 coV n n N CO LOCr) . .- CO(O - CO7 CON V N N O CO O 0 ' N U) N LO LO N IA N (O CO N 6 OD W 6) M W 6 O) W W W OD CD W n N CO CO Y V V Cr 7 7 Cr V 7 V V V Sr Cr Cr Cr Cr V 7 V Cr Cr Cr V a Cr V N Y Y E co CO CD (O (O (D CO CD CO CO CO CO CD (O CO CO CO CD CO CO CO CO CO CO CO CD CD LL O O E ct C U N N N N (f) to to U) to LN (N N to N in to l(f IN to N N LN N to u) to - N N N � U 7 CO CO CO CD CO CO CO CD CD CD CD CO CD CD CO CD CO O CO CO CO CO CO CO CO (0 >.) N N 2 a W > 1 LL F W - N N O N CO N N CO Cr) _ n CO 7 LO CD N0 M LO CO CO N N N O O LD M LO N0 r CO LO N O R (D V CO CO V CO Cr O D7 N LO V O) n CD LO V O LO 0) CO 01 0) CO O CO 1t) CO CO O O U) Lf) V M N t- O 6 M n CO LO 7 M s 6) OD (D N Lf) N V V M N N CO U CA O O O O O O O O O 0) 0) co C) 6) C6 co Cb W Co CO co CO op W W CO C CC ` r n n n N-rCO CO CO CO CD (D CD CD CD CO CO CO CO CO CO CO CO CO (O CO U) t L `V V V V V V V V V V V d' 7 V V 7 V V V V V V V V' V V W N ., N +:r n n n n n r N n r n r n N n N n N N n n n N n N r C 7, 'm 0) m m 0) Cr) 0) m o) m 6) co6) rn a, 0) D) 6) 0) a, 0) m 0) 0) rn m w 2a. Z LD lD N U) U) N U) Ln N N LO Lo 1. U) N co- co- N N co- N U) U N N U) C d d '- O is C W U N i ` U 7 DCO Ln O . . 7 V n cocoa0 D N n CD O CO CO LD V N LO 0) CO d) rV N CO CO CO O CO CO LO CD N n OD Ln CO rM CO f) CU dV N N N N N N N N N O O O O O O O O O O 7 O 7 ] O Nw aO 2y > m — 0Ld Q 0 , o J 1-r2 2 co 0 W -C o CO co co n.. U) 0) N O n n 6) M O CD n O N CD (O n LO V O 0) M Q. Cr) O N M LO n CO O N CO �' LO 6) N O 0 CO O V = 0) 0) (I) N CO LO CO N CO 0> O N M V 6 n O) O N M M M 7 7 N (D (D V CC N N c';' `'.4 N M M M M M M M M M ("? M CL yN CO z ZV CO CO c LL O O 6) CO CO n O O LO N M 'N 6) W n n (D (D (O CD O LO N N V C M M co co M M M M M M M N N N NNC NNNNNNNN LO N N N LO O LO N N N .tO:' N V7 LO LO N Ln N lO N N N lO LOM M M M M M N M M M M M M M M M M M M M M M M M M CCD DH O .- N M V U) CO (O n O 0) 'O :06,7, M N (O n DD C) O r N M V CO co gN N N N N N N N N N N M CO CO. M M M M M M V V V 7 V a O co V V CON N OO 6) M CO r CO O O) CO Cr) 0) O O 6) W 6) 0) co co co co co_„ co CO co OO co co Co Co co n n n W O 0 CD 0) 0) CO O 0) O 0) O O 6) 6) O O 0):i m O) m m 0) 6) 0) 0) O N CO V LO CO CO n CO 0) O N CO Cr LO CO P CO 6) O N CO V ^ N N N N N N N N N N N CO' CO- CO' CO- CO- CO CO- COM CO. V 7 7 V V Fly .0 co n n M O O N N CO CO M CO N n LO N O LO LO N CO CO CO 00 CO M (D O N n CO N M CO N N r N CO V CO 7 O co co 4 co co LO co ✓ M N N M n CO 0) N N n CO N LC) W O O n 6) N L CO CU 6) CO nor, CO CO N LO CO V n n N r n CO C3) O CO. N 6) CO N V 3 .- .- .- .- .- .- c- .- . N N N .- N CO E LL2. R v CO 1J Y Q CO M CO O N MON CO LO CO N CO OD CO O N N LO O LO CU NO CO LO N Q LO CO n CD N r n N N n n n co O) m CA n V N N (O co 7 CO J O O O O O O O O O O O O O O O O O O O O O O O O O N a (o U N (U m C E• N N r -o LL N N N O ` m N N N a Z d O_ Il LL LL O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O DCDCDCDCDC 00000 00000 O O O O O O O O N O O O O O O O O O O O O O O O O O O O O O O O O O CD O O O O O O O O O O O O O O O O O O O N M 4- co CO CO N N CO 6) O .- N CO Cr LO CD n OD O O c- N CO LO Q ^. N N N N N N N M N N N M CO- M M CO CO- CO- M M CO- V V V V V V R 5. C) C 7 n 0 a g o c d o .o En E •o an d 'm N cia` m33c in r • . iii y u) O N U) s- M CO 0) C0 CO N CO M CO CO 0 O N n CD CO N CO CO a CO M_ CO CO s- s- n O n o a N CO O 0) N CO CO CO CO LO D) e- O N CO CD N O. O n O) O ' M 0 Lill�� n CD O co )f) a CO N N4 u1 co O CD N t0 O M CD p N N ser n 0 a CO M N M aO M m a O) a 0 CC) 0 O O N .w N N M CO a N N O n N- CO CO O 0)O 0 0 `WV V CO M H O aia= 43 lid 01 IN N O) a 0 )D CD CD N n 0 O a a0 s- CO O) CO 0 n 0) N- CO CO a CO CO O) N N s- a CO IN CO CO CO s- U1 CO an s- e- CO O M N N O N M N ✓ N N N N N M N N N N s- O O O O O O 6 O 6 O O O O O O O O Q N 0 O 7 O C' J G Q27. cc la ada N N 7 Y C6 W CD 0 Z N a f0 0 O O 0 co O O) O co co O m CO N n M N- C0 M CO N M CO �`�\ Q 00 N ' 0) N a CO M C0 n CO M n a 0 ' n a ' O f0 CD n G G 7 COM �D CO (O (O N N W M a a a LO M CO N CD Cr, CO I� M a N CO 0 u) Di O M n O) s- N N M M M M M M N N 7, O O Di m W n (D 6 M Nm CO Y a s M M N 0 O aO N- (D N a M N 0 Cr, CO CD 0 'Cr M N 0 Y Y E co c0 co co co CD CD (0 CO u) an LO 0 U) 0 0 v) 0 0 a Cr a a a_ a a c a LL Q Q 7 d' C r N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N E y 7 to Cn lD LO )O LO N t0 C0 N 00 LO N N C0 4) C0 N LO Cn N to C0 N C0 N CD - N N 7 C_ t0 co (O CD CO tp CD (0 CD (D t0 (O (O CD (O CO CO CO (O CD 01 CO (0 CO CD CD (O (O > u LL I- 2 W W N- CO N a 0 CO O a N- LO N CO N (O 00 IN (D (D CO 0 O N N O) 0 LO a a O 7 N O) CO (p M IN a 0 O) a CD 0 0 0) CO 0) CD N CO 0 CO 00 O O O O CO C0 O CD N n a (0 O) IN M CO CO. N M M M O a CO O O 0) M CO n a0 6 N OO 6a CO(O CD a n O M. N a N C0 CO O C) •• O f O O O CO co 0O N C0 O a O a O a O a 0 N 0 C0 0 CO CO n C 0 C CO n n n n n co co CO O O0 O N M M a s N (O (O n ro 2 L L r a a a a a a a Cr a a a C0 00 C0 N N (0 CD N LO N 0 0 C0 0 N N N w a) 7 N- N- O0) T C 0) CDm On) m a, CD 0) m C)) 0)) 0) On) On) T On) W CD On) 00)) al a, 61 Z ui N N Cn CC) Cn 0Cn C0 N Cp ui N (0 N N 6 U) 6 (t) 6 N Cn N N U) 6- c a) N p •_ y a) C V l0 V -Q L V QO V D W a O 0 a � CO CO 0 a N n a CD O n a CO CO to N t` - O o CO O O O 0) O CO CO O CO CO a O n a 0 (O CO N CO n 0 C . iCn oCO O a N O 0 n O Ua s h M M N N N c'l •cr ( Cco I OD a, 0 N M a N CO n 00 O NNV wd I t t t N t IM x s d 1 p O O 0 ' N W v t'' O 1 O Cr, 0 0 a N- o n M CO N CO n N a co O O6 a) O co O O (D Q O M o Co N co O O N CO CO CO M a LO N n W CO O s- N O N CD CD CO O CD U) c- M O n N O O n O N 6 O 7 co 6 n 6 O 7 7 N Ct N a N- O a CO N N NN-COa s 0 C0 CCO CO n CCO 00 O N- 0 0 . T to cs- CO Z 7 (/) 4 c6 C LL O O M a aO O O 0 CO CO N u) u) M CO CO O O CO M O a 0 a M a IN O N CO IN CO M Cp N O CO a CO c. n n N CO 0 O (D CO a IN O a O CO a s N O n M n O O O (O N ao M OD M n 7 O O U) O Cn O N n 01 M M M M N N O a0 N CO a M O CON N a N O CD (O (0 M N U) t0 CO n CO O O ' N M M a u) O n CO O 0) O s- N CO a s N O n CO CCD O co a a a .0 a to N N ui ui u) C0 u) C0 CD N N CO O (D CD O CO c0 co- CO CD a O u) 0 M N- CO N M CO a N n CD O Cr, N- O N- M M N- n CO CO a CO n O O CO a N N O n N 0) 00 CO N co r O Cn CO O N N O U) a O W n N (NI n N a U) a O O N co M N- CO O Cn O4 O u) O O N O O O O CON- 0) COCO 0 a N O 00 CO u) M_ N 0 CO n CO a CO 0 (0 CD n CO O 0 N CO a u) N n n CO O) O N co M a (D CO n 03 O •-• a a a a a 6 6 h 6 co- Cp 6 N Lc N u) O O CO co- (O O c0 (O co O O 0 en N- 0 O C0 O O CD ONCOON O M 00 C0 N 001 M CO N- M u) u) M O N0 CO O LO IN CO Co a 0) 0) O O O CO n CO LC) a LO a CO N co a N O CD W N CO (D (O IN CoC3 O O O O O O O O O O) O O O O CX) 6O L 01 a a a a a a a a a a a 0 N a a a a a Cr a a a a Cr a a M M M M M M M M M M M M M M M M M M M M M M M M M M co E N '5— d s m 'N I a (n NCON O C10 COM N M C0 00 an n M N LO M N N N N 00 Cp n n n JM 0) 0) 0 N CO CO a ', O N O 00 a0 CO n 0N N m CO a Cr. N O n Q N n O 6 N 6 6 6 (D OD O O O N N N N N N O O 7 7 c- Cp N N N N M M M M M M M M CO M M M M M M MM V T V CD CCI E a) N • L d Q Q o (-Si N N 7 m 2a. 0 LL LL U O O O O O O O O O O O O O O O O O O O O O O O O O O O Z a O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O eL O O O O O O O O O O O O O O O O O O O O O O O O O O O O IN CO O O e- N M a to CO r CO CO O s- N CO V u) CO n CO O O .- N cmpO Ea a a a 16 (() u) t0 u) (f) (0 an CD N (D (O CO CO (D (0 CD (O (O co- n n n V 0 C df 2 V n a pO c d O O d N d 7 O a N >S 0 N 10 • CO m O N N N VII1• U) V CO COU) N V M CO O O c0 6) O 1`, O N 1` U) O N O O OO �_ O cc; OR U) W U) 6 r O O O N L0O N R O V O II- N N M M 7 7 r-- N. CO CO Q) W O O ,- N CO CO 7 VE. r r r r r r N N N N N N N N CO W� rbagon o a= Lo0 m 0) 0) CO 0) O 0 O 0 U) Cr CO N- CO 0) N 0) O 0) O V U) N CO U) CO g V N O a- U) O N V V a- a- N V V 0 O N N U) CO M a- 0 N O O O O O O O O O O O O O6 6 6 c- N ,- .- '- O o z U O o o C z....' vcc CUU CU 2...."-- = 3 > d V V N U) Cc L0 V CO N co N- N M O r N- 6) 0) 6) r- O a- N- M O O V N. N co co co CD OC N O U) O 0) CO V U) co N 0) 0) N- 0) Cr CO U) V U) O O M ©© 3 Q CO U) U) 'Cr N a- V CO N V U) r CO V c- O M N O r a- VN O V O ' N O CO O V N O O r U) M O 0) 0) 0) O r O O M 1- O d) O) NCO CO Y 0) CO O U) V co N O 0) CO N- CO U) CO N a- O 0) CO N- N- CO 0 V CO Y Y E U) C co co co co co CO CO CO N N N N N N N N N a a- a- a- a- a- a- LL O O 3E N N N N N N N (Ni N N N N N N N N N N N N NI0 .11 00000 00000 00000 000010 N N N CV- LO j N N ` C_ p )p ... co co O co co co O co co co co co co co co co O co co co co co O co O LL LL F-- 2 W W co V co N. V V O V a- N N. N. N N- CO 0) O CO CO M O Cr CO N N- O _ V N N CO O 0) V V U) C) r O m N V CO O - V N. O 0) N N CO V V V Cr N- Cr CO CO U) CO V M CO N O 0 V N 0 O N O O O V N O r U) U) O M O N O O O N O O O co co V COCOCOCOV U) CO V 0) V 0) O N C 7 coCO CD O) U) O O N N N CO M Cr V U) U) CO CO N- CO CO CO 0) 0) O 0 t L C 6 U) U) O O O O O O O O O O O O O O O O O O O O O N. d N .t U) ;'N r N. r r N N. r r r N. N N. N r ti N. 1� N N N- N- N- N- m m 0) 0) rn co m o) m a, rn rn m a) O) 0) co rn a> rn m N- CO m rn CD N O A N +.7. C Cd) hi C N71 dCVy UM — N O O W N O O Cr N- M O O CC N N CO O 0 N V V N CO N CO M O NI- W O UO CO 01 U) O CC O W CO O Q NwUW N0 V 0 O CC O O 4 O N N N o O O O O M Uco N. co W 0 M V UO f, CO O) 0 N N M O V N M V O O Qd RCV NNNNNNNMMMMMMMMMV V VVVV V V0 V A L 0 O C O 7 )U W 7 J 2 Z co CI t O O O h N 6) O CO r r 0 Co O .crn O O CO CO V _ N O Q 1` 1` cr N CO 0 M CO O CO N N r CD V V V O 0) CO N CO (i) N O 6 CO CO MO CC CO V P') 6i O V Ui W C) O N T O C"i Ct U) O N 0) V CD V 0) M CO CO CO CO r N 1- N N. CO 0) _ V 1- CO • N N N M M.: V V N O O O N- r O O 6) m O O • N N CO a N co E - - - - - - - - - - - - N N N N N N N m L' z A C ci) (o C LL N OMOCC O `Cr O O r hW CLO N CO V CCC N COelC^') CO M O O M 6 O V 6) O N 6).-.O M CC V CC M M M N O co N 01 CO O U) 'Cr M O 6) h. O 0 V N O O CO O V N O N. 0 H 0) O O a- N co V N CO r N- CO 0) O r- N CO M V U) N O 1..- CO CO In CO N N N- N N- n n r n r N r O O co- co- O co- co- O co- O O O al C N co 0) N N O V N- CO - U) CO N. U) :U) M N M N... CO O O M CO O O CO N O N CO U) CO N N Cr 0 O CO O O N N 1- W V O V r V O O M O r V co U) M O M.::..0 n O r r N M O N- CO V M N O 0) O N. U) V M O_ Cr/ N. O Cr N U) O O O V O O N M V U) O O N- CO 0) O N N 0 V0 CO CO 1� N. CO 0) CO- 1- N. r r N- r r r r r r CO co- co- O 6 co- co". CC CoO C CC CC W CC F. N O CO O O CO O V CO') N N O W O N N O CO O- CO Cr N CO N- N- n N- r n n r r n N- r O C) m W W O N NNNN L V V Cr V V V V V V V V V V V V V V V CC E0 C N N N U) 7 M M CO CO CO M CO M M M CO CO CO M CO CO CO M M :CO CO M M6 M E _ N o_ a co 'N 1 a 0 n N U) O O M CO M N N O NONCON O N N C V N N N- N J O N O O 0) CO N. O CO O O CO U) a- CO 0) 0) N O O U) M U) C0 CO Q O O O O O O O 6) 6 O 6) 6) O 6)) 6) 6) 6) M V O O r N. O O) M M M M N N N N N N N N N N N N M M CO CO CO M M CO M CO U N V N co C E• N N 'O LL N N N OOE CC N N N a Z El- Cl- IL CL CL O O O O O O O O O O O O O O O O 00000 0000 O O O O O O O O O O O O O O O O O O O O O O O O O Cl.. O• O O O O O O O O O O O O O O O 6 6 6 O6 O O O O O O O O O O O O O O O 00000 O O O O M 0000 coIn V U) O Is- CO 0) O a- N CO V U) O N CO 0) O a- N N M V U) O 0 D N. N- r N- N- N- CC co- CC co- co- co- CC co- O Co CA Oi 0i 0) 0i 0) CC CA Lo nO d V c m z 2 o) F r. 0 s.2 o f d o a o) c°� ain33o rn N k i i ! m . y M 6) V - W U) M M V N V CD W U) Cr, co N O co. co O U) V V CD N CO. CO O n n O Cb W A- 0) W co co U) CO N 6) O O O n CO 0) co v a 1'�� o M U) n O N U) 0 o co g N- c0 coP n N 0) W OOD .o `W.w ga N N N N N N N N N N N N N N N N N N N CO v"Nemo !n c, mlI c, N N U) U) CO CD N CD 0) UO U) V N N CO o V a d CD U — OO N co V O V N N V 0) 1- r• CO CO M 0 p U O d U) N (O U) M N M CON V V M Oft O •V M n 0 Z 1- N .- r c- 0 Q O N N M ❑ -I o o ❑ d 3 a ✓• V d U) 0 > Y 4 4 CO N N CO CO CO N W CD 0 0 n 0o CO UO V 00 p`�` Z V co U) O co co n O O N O O n O O n O co ©© 7 Q Cn n n O N co. n co V ,- N O V CO CO V 0 ' V co CO MN V O co O N c0 O M n O Nco co Y a co co N N N N N N N N N CO CO CO V V V U) U) Y Y .,- .- — — .,- .,- ,- r LL 0 0 a et C = N N N N N N N N N N NI N (V N N CV OV N OV — N N N E E 0 ) N U) U) co U) U) U) U) U) U) N N N CO U) N h N N N N N ` _ O CO CO CD CD CD CO CO CO CO CD CO CO CD CO CO CO CO CO 2i LL OL H W W CO 0 V U) CO V O N CD 0 CO CO 0 n N 00 O 00 M CD N n N co co co co N V O co 0 V CO n 0 CO n V 0 V CO N M CO C` N 0 N CO V 0 a CO. V Gi O O O W 0) Ni CO n V M V M M co Ni coN U 'O O n CA N V n O N U) O V N- 0 M N n 0 N C O E O O ,_ s- ,_ ,_ ,- N N N M co M V V V V U) OO x h h N r r n• r N- N- N N- ri r In N- n N- r N w cd 3 OniN. In O) 0) On) rn 0) N. m C) T 0) CA 0) CD CD CA W O C 6 v N N') U) U) N N U) U) N U") rz G z O 0 @ m ._ U f0 U d C p U 3 m N CD 0 O m 0) O CO 0 N- W N 0 0 L C y V 6) V N r M n 0) M N O N 0 O r N 6) CO CO V ` A On n O N N fD N C) (D n V O r Ni W V CA V O w wN co UO n n n n n n N- co CO UO UD CO OO V V CO CO Ced es sr q v v v v v v v v v v v v v Y 1- 5 5 - L J @ 2 N ❑ W =' t 0 n OO ..OD O CT n UD V UO O CO 0 0 N CO 0 N Q CO UO AN V n n UO n UO O V N V V V 0) CO O (I) r O O CO n N 0 CO 4 U) V V V' Ni n Ni M o (O O N V O m V n O M O CD N V CD 6) M M V V V V V OO N N (O CO CO CO n n n N OD CL 0.) N - N N N N N N N N N CV NV N N N N N NiN NiN CO i 2 0 C O O n M CD 0 CO z0 M N CO O M M O CO O U) O OO M N a0 CO 0 'M r CO N- CO O N V CO N N O n N o 6) V U) C) M co O N OD Na V V Ni O co U) W O N V O N- coCA O N N N N N N CO 0) 0 CD O O O 0 0 0 0 .- `- ,- c- .- .- W CO 0 00 OD CO CD C)) Oi O) 6) W CA O O CA CP O) CD W CD a ❑rn N N V n O) V o V CO 0 =. O V n N V n N CA M - O CO CO CO CO UO CO n CO .,M CO N n CO CO CO n CO n O M Co O 6 n n Ni U) O Ni O Uo W O CO V n O N V O CO O N V U) ,, n C0O m UD O O O 0) O 0 0 0 0 .'�a. 0 cd C) 6) O) 6) CD CD CD CD 01 "'-"OI 0) 0) 0) 0) Q) O co Fel_ co O O O O O O O V N n OO 0) N N N n CD OD CD 0 0 0 O U) O CO UU 4) n o n U) N N O N- N N M M4 O N4 V V V 6 (D n Oa; O N U) L :I:, N CO U) N <- ,- s- ., CO M co M M E N ..... 0 m 'N 1 Q Un co V co co In V N 0_ n n M M (O W n ORI Q O V n co co N N V O O n U) O N JO O 0) V V C) M NU) O V n 6) M CO U) CQp V V V co V CO co OO UO co n n UD 0o OD O CD CD O U T 1I U .N m C " L L L L L L L L L E N fro 7 7 7 7 7 7 7 0 0 • o a E E E E E E E E E O E co N N N Q 4 4 4 4 Q 4 Q 4 Z a L IZ o 9 V mO Is Tr co 0 is CD 9 co 13 n 3 O S N U6 CO N N n as Ca E O .dM .. 0 dV dV 20 24) 2M dO lien U0L- UV UN aOV UR N N N cNN O R D 2 j A V R V R p O O O N O Ni V n 0 0 OM OO OOON OCO OCT, ON CO CANU) 0o0 NON- ^ 0 coe.neN e.N.. E. ^ E OD ECO E.00 e6) E 0) 0) o 0 0 . 6i O o y ) m Cii y 6 y 6) y cc i y Oy ay 0mO O O O O O O Lo c y ❑ )1 c E . c c c c E c v 0 ma y Jao . ) -6yy Lo U L to ❑ nN Lo • 0 . M 0 N 0) CO co V V 00 N U) 03 Co r N N 0 h CO N N N 0 Co m U) (O N M CO CO M r 0) CO. U) O) U) O O n 0 0) e- N- N 1- CO r- N O Op 1.A/1 O V N 00 N Co O (D COO) 00 U) Co N6 CO N Co O U) M4 N a (O O N V U) O co V) CO V CO p) N U/ CO 0 CO C O Co V) CO V N- O CO CO O O O O O O O x- x- .- N N N M M M -et Nt V V N U) V) U) j �W0 d E N N N N N M M coM coco M M M M M M M M M M coM M M coM CO co a bgj 8 o 410 coCO co co V V 0 N I- U) V 0) 0 n V U) N 0) U) Co c0 U) N 00 V N a M OO M - 0 U) V O O .- N 0) V N. M 0 N n co co ' CO 0 s- CO CO U) 0 M ( V V VM O V V O O - M Vn M M M M W - UU O . s Z V a a N T. 7 o o o 0 _- (0 (0 cc z0 NI- U. m m U) U) w00 COCO U y (VO IVO (6 W U) O O co 0) 0 O) Oco_ N N U) ) 1) co co N 0) N- Co 0 0 N- _ 0)V CO ©p' Q O V7 COO M N- U) U) U) CO CO V 0) 0) (0 V) O CO 00 0) V 3 U) O V U) O U) 00 O O O V CO CO 00 O (D O CO O t` h O O Co) V x- (.) (..) Ni V U) U) M C) V N- O O 6) n N4 (O (o U) M V N V N ro V) NCO CO Y U) I- CO 0) 0 0 N N 0 0 0) CO r CO CO U) U) U) U) U) V) U) Y Y E (p C - - - - N N N N N N N N N N N x- x- e- x- s- 7 • N N N N N N N N N N N N N N N N N N N N CVN N N N N N - N N N E 2 N 7 (6O coc (to (UO (ND <C) CO up N (CO (CO (CO CCO (CO UO (up NO (CO ((00 (CO CO CO 1+1 C (UD ((0 (Ul CO COC0O (CO (0O CON T) N N ` C 0 NL li Ni H W N N- co N- O V N O co co n V V V co U) O V ,- N N V V U1 N 0 Co) CO N CO 1--- V N 0 0 U) CO N N 0_ 0 _ 0) CO ,- N Co U) U) U) OD N N O M O U) 0 (D CO CO CO M O O M V N U? M V O N V U) O) O) 0) U) U) N O W N V M aD OO V N 0) U) N n U M V (NI0) N- N p .a co V n O co co O V N- O co co co V co 0) N N O x- V N- 0 N U) CO C OC 111 (p U) U) U) U) N- n N. OD CO CO CO Co 0) O 0) O 0 0 x- x- e- N N N N L L = N- N- N- N- N- N- N- r r r r N- N- N- N- N- n O co- co- OD co- OD co- co- co- 00 w N • ca 7 op 0) 0)) 0 0 O) 0 0) 0 0 0 a) 0 0 01 00)) 00)) 0 0) 00)) 6a) W 0 Or) On) 0 co d 26 N U) U) N U) U) U) U) U) U) U) 6 N U) U) U) U) U) U) U) N V) V) U) U) LO I. C Z N ili p C d V F V 0) C 0 - co N V 0) r CO r U) 0) U) N 0 CO 0) N N- 0 0) 00 M U) 0) Co C v i 0 N- N- r 0) V N V U) COU) O O 'W n U) r M M COV I- O O V 0) C � r � O ` 4-'60, R V) Ni N N Ni r N OD N V V U) O V O) O U) Co .- V V co .- N_ V n O O w U N N o 0) CO r N- (0 U) CO U) U) N- N,- N- CO 0) 0 N () V V V M M M M Co Co M M M Co M M Co M V 1- 'N 'N ' �' Y V v v y L cu R O r z A p 0 0 . m w t's"'` J 2 Z N D 't O U 0) 0) V) V 0) U) I,- O CD Co) CO M V 0 0) V 0 0) M N Co 00 I-- O L- CD CO N M U) O _ 0 U) Co) V CO i` N O U) 0) 0) N-- CO V U) OD O V a) 0) co U) N 0) N (D V N O 6 N- Co 0) U) (-4 N- U) 00 V N = 0) OD (O Ce M co 0) N U) N- 0 M (D 0) N V r 0 Co U) OV N- 0 Co U) 0) V N� CO CO CO 0) 0) O 0 O O O N N N N M M Co V V V V U) U) U) d > N - N N N Ni Ni CV M Co M (;i Co Co M Co co- M M M C> M C') Co Co co- Co Co Co Ws c it N M V U) U) V U) V)....N O V N O O CO CO V (D V N n M O M ✓ CO O (D O 00 CO 0V CO O CO M (D O O CO M M U) N N N M h O CO h V O N U) h n N`.....U) U) U) M V V U) U) U1 V V N M Co) M M 0) 00 Ni 0) a- .- 0_ 0_ O CO 0 c0 V M N 0 0) CO U) U) V N 0 O 0) Cr) O o O O 0 O O O O O O O O 0)O O O) CO 0 a) O Cr, O CO CO (O N 0) 0) oi O O O) O O p) 0) O O O) O) 0) 00 00 a0 co" OD co- co- 00 co- co- co- coa. - co r UD 0) 0) U) CO 0) CO () V CO (O V V O N CO O CO CD r Co N- U) O M V CO U) M M U) Cr) M N M CO U) U) M O CO OD O CO 0) N N U) O U- NN- - UO NN MNO O 0O U. UO) U) O) 7 W CO n Or 00 Nn- Ur) UO 0V _ _ _ _ O 0 0 0 0 0 0 0 0 0 O O O O O O >, 0) 0) 0 6 D) 6) 6) 6) 6) of 0 O) a) 6) 0) D) 0) 6) 0) 0) 6) 00 co" co" co- OD OD 3 7 O 0) U) V M U) U) (p CO U) 0 U) 0 OD - x- N V) V CO 0 =:O Co N V M M V CO U) 0 N N U) U) CV O O I--- •t U) O O UM U) p N U) O O . O V O UOUNOUr) N 7 N V M O V O U)) - p - n) UV UNU = Co MM Co M M M M M Co CO Co M CO E N :.. a 07 •N a c co U) N V CO N- N U) N r N U) 0) CO 0) U) M N Co N- O N U) Co) Q V O U) Co) U) .- M V (0 N N U) U) O x- a CO N n U) n Co U) CO N- CO C 16 'N U) 6) c r; ,- O O ,- .7 O Oo U) U) n 6 a) 6i D) a) 6) 6) co co U) O 0) O 0) 0 0 0 x- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 e- CO U > V 0)• m(CIC a 0 a r .0 LL N N N O i CO N N N Z a a LL Il Il U) O) Co M a N V O Co M OD (0 U) Co 0 0 aD r V V M OO CL Co - O N U0 NTN 0 OD U) U) U) x- s- 0) M CO U) U) M U) CO CO N 01 U) U) U) U) N- O O) O O O O O O OO N6 6 6 6 0) N- N- N6 O6 O O O 0 N U). O N NCO V0-• O Co U) 0) N U) OO 0 V h V U) 0 Co CD 0) •. N N N N Co CO CO V V V U) U) U) U) CD CO U) r N- r CO CO 00 0) 0) Cr) 0) 0 Q E O O O O O O O O O O O O O O O O O O O O O O O O O O O V C . .. 0 r r n a V 6 C T E o :3 d d •'� Z Lo O a N 0 U) N (n • • CO 1. N O O N N O V O CO M M N N N N CD CO CD CO N N N CO N LO s- W N V N O O CD N N V N N CO M N CO CO CD N O N O V 0) 1. N L 6i a0 <D V V M C) M M N M N N <- O CO (0 U) O N N V V N 0) CO CO a CO N V 0 CO CO C) N N CO V N O M CO CO M N O M cO CO CO CO N N N CO CO CO CO 01 0) CD O O O I- a- e- N N N N M M M CO ` w W d M co- M tM CM C7 C) M (h C) co- C) C) v V v v v v v v V v v v N O j a O 4 COco m CO co O co O co 0) CO co N LO N N C) CO CO M CO CO V 0 N N CO 0 0 V V a d.- NI 0 CO N CO N CO CO M N V N CO 0) CO M CO CO tO N 0 V C) 0) s- N LO p 0 N M N N N CO C7 CO C) N O4 ,— U) M6 o N M CD h N 6 CO Z .- ,- 4- U Q 0) 0 OJ• O O 0 o 7 3 a VV N co N N g W Cf) LO 0 V 0 CD CO CO LO f0 0 0 V N U3 V 01 N CO o CO LO V N • N K) CO N V CO N CO CO CO CO 0 CO 00 M N N CO LO N N V V 0 CO CO • Q 0 CD N 4- N N V 0 N LO V CO •- N N N CO e- CO N- CO O LO LO LO V CO 0 L V V O 0) O N M N 0 6 O M C) N O M O 6 N O O CO V O N Nm co Y coh coLO coCDO (OCDO NLOVMN OO) 0OON MNOCON CON E n s — — — — - — 0 0 0 0 0 0 0 0 0) 0, m LL Q E C = N N N• N N N N N N N N N N N N N N N N N N N N y LO LO O () LO LO LO Y) LO O N LO LO O N LO U) 01 LO LO O O O N 0 N D - N N N mIDOCDCOO co CD (OO COD (DNOCDO ocDCOCO (O COOCOCOCO NO cm (7) LLN H` O O OO N N MLCO V N NM nOD NN CNA MM 4228 818 ,17,- c7 N V V M O N O) O CO. M N 00 O N CO O O) V V O N tO O CO CO Q) M O U) V C) N O O O O 6 N R N 6) V co M N N N (D N N 6 O -0 co V N 0 CO CD 0) N LO 00 V CO CA N CO CO CO CO CO 0 N V CO CD 0 C M M M V V V V LO N LO CO (O CO (O N N N CO CD CD CO C0 O O) 0) C O d t L ` 00co- co- co- CO CO 00 CO CO O CO CO CO CO- CO CO CO OO CO CO OD O CO- CO 00 CO O w N 0 ON) ON) O ON) CA O O ON) O C) O N m) O 0) 0) CA O) O ON) ON) ON) 0) 0) O O O N ON N Y) N 6 U) N 0N N N LO N U) N N co- N N6 N N N N N LO N c z C) O Am 2 y U 10 U O O CO O Cr M V0 N4 CO LO 0 CO CO 0) N 0 0) CD CO M V 0 0 N- CO 7i ,C O O CO U1 N CO O O N V N N co co N N co N V N N N C) C) LO CO 9 a N w A o6 CD M O CO N N O N N V co co C) - V N e— N 0 M O N N o w 0) 0 d 1 N vvyvO 0 0 O vvN CO V LO N CO CO N V LC) N CO CD 0 ✓ ° rtTvv vvvv Vvv vv 'f - uuunDuTO ' a) a u- OO> O r r 0 F- g Z N O • W O CO N CO N N N M U- N 0 0 0 V N O N CO 03 N 0 N V N Q _CO V LO CO >.:COCD N V (D N (D N CO CD CO m O CO CO N O CO V 4) V V Ni - e- e- O W 00 CO C) ,- (O O CD CA O a0 O N O) CO O co (0 CD N LO CO .- V N 0 CO LO CO LO CO 0 M LO N 0 V CO N CO CO CO 0 (O N N N CO CO CO C) C) 0) C) 0 O O N N N N N N a > N CO- CO- CO' CO- CO- CO- C) CM C) CO Ci CO Ci C) 7 7 7 V V V V 7 7 V R V a CO i z (n '' asc L— CO N N 0 N 0) N CO CO N N 0) N V O 0 N CD 0 CO N- M CO CO CO N (D CD N CO 0 CO C) LO CO CO N N N V V N CO c0 O V O) M N CO V U) O) C) O 00 CO O N C() N o N Ln c; Na)0) V 00 C) CO CO N CO N 0 N V V u) LOLO LO (O (D O U) N N O 0) 0 M V (O N COO OO co co CO co co co co O W co W co co CO CO CO CO CO O) 0) O) 0) O 0) O 0 C CD CI CC C' OD CO CO CO- CO CC 00 CO- 00 CO W ao CO co- aD W 00 co- co- co- co- co- CO CO 0) a O N 7 N CO (0 V CO CO CO N CD CO CO CO V V CD O V K) CO N N 0 N CO • V N CO N N LO N O Cb V N N N N O) CO 0 'N CO N CO O) LD 0) 0 CO 6 O C) W V M M V N O) N V N CC N CD N O OD O V W N co N V 6 co co N N N N N CO CO V U) LO N CO O N V 0 O CO O O O 0) 0) 0) O) 0) CO C0 C) C0 0) 0) CD CD C0 0) O) C) O O O O O ^ co- OO co- co- 00 OO co- co- co- co- CO CO co- co- co- co- CO 00 CO OD CO co- CO CA co- 6 O1 SFT+ v COro O N- U3 CO M0N CO V V ? OO V N CO N 4.) CO N N LO CO CO 0) O M N V M N N N O V N 00 V O co CO V N -CO N M OJ LO 0 (O O .cN N Y) V V V CO CO CO CO CO N N N N CO M V CO CO CO M CO CO CO CO CO CO M C?.:: CO CO CO CO CO CO CO E _ .N a = m .N a 0) M o V O M N CO CO CD CO V CO N O CO N 0 N O V 0) CO 0 CO N CO V J N 0 N 4- N C) C) V CD LC) O) O N 0) CO N e- V x- LO N N O CO 0 N OOC) O 00 D VVCONNVCO rNQ O O CCOCCOCO COCDCOOO ON N0O coN coN CO CO CO CO O T t) 0 CO C N N Q o a t II LL N N N O E CO N N N Z a a LL LL LL CO CO CO M N M O O CD CO O LO N O) V N COCO N V M CD N OO M N Z a CD LO U) LO CO N CO CO CO CD CO O 0 Co CO 0 u) 0 N .7 CO N M LO O CD 0) O O O O O O O O O O O N _N N O N M (N O M t0 CL r r r o �- r r r r r .- r O O Q) r� cm cc • o O N N N N CO M CO V V V N co co CO CO CO CD N r N co O R C N �' .y0.. N O. H -iUJ ' a • • . H 0 co CO m ,. _ co m a �W 0 0n � m i� j = o aLo m co O a a_ O O o z H O 7 ❑ 0 O O N N ... 7 7 a V V 2 In N 7 y G V 'S aO i 0 CO CD N CO Y E L., c ti 0 O )" N- N 3 c 0 O O O CO U ti H ❑LL ''.... w a) t z N I 0L- Lc) (1) ui o Y C G c Mo a) 2 L L y 0"; m O o Z LD- N Q3 112 0 as - V cts ca) V N O U V d 7 C F„ ` w N N m O d w z � w Q) .c d 4 til Ci- Ce0 t'' ate+ N t0 CO p O 3 m W 7 N J 2Z d) 0 M a) C i t - O N Cc) Ca a) rt N Cr CO 03 CL. a 0 a h CO Z .7.. .c _c .c L .c .c L L L 0 EEEEEEEEE T M Q Q Q Q Q Q Q Q ¢ o a v v a. -p v v a v CC N N N I' 2 N N N N N c CO a cO c N CO W 16 CO 0 N N f6 O - .-- N O O 0. O O O O O O U a) 1. o a a a a a a a a a 8 W 'Cn CL G a 0 N.-d) N N N N N N N p d 4 a N U F- c."'c c c c c c c c a. N W ,-- a) u) c0 0 co a) ''0) a) V CO CO (� O)::0) 0 7) CD r O N c0 N {r N O) ,- 7) � (0 I,- r r r � � r O O �_ w 51- 5YIYYIYY 't �D N N W 7 c0 N + O R • a) c 7 O O U R co r CD CO CO CD r O V' O O V 0CO CO c0 N .7 r I� O I,- O O N O J CO - O O CO 1s cd N c6 Lfi o M co co O N V' 0 CO r.... N 7 I V) e M M M V V' V a 4 Lo N N CO _ '� Z a) N N N N Ni. N N N N N N V 3 M + 7. E ., N :.. to0 co •q Q7 � W I'M O VO O W M O crn R t c7 r O M O O M r r N 6 N Q N O Q.y 0 Ori 0 0 0 0 0 0 'Cl. N- CO Qai ; „7„ cc W a a a> O) M a O) O> O) O) 10 a O O N V 4 O U) Op c • N !"fel O 0 N V CD CO CD CD CO r O O Q O d O O O co O .7 V M 0 M0 0 t O C Nn co N Ic0 c0 P') V V O 'C U N N N 7 i' O 4 r... O M CD CD N cO CD N CO O 0 m N N N ~ H N N O c0 O r r r r co co c0 a) O Z a a tL tL tL r d .7,.N O Oi. O Q1 D7 O) W a) Q) D7 O) O O - O O 2 ID i co M J y O h p O C v 0 c 2 2 a Q I. psa " „o m o m iV ao 0))nD o N ) ) Loepp, Victoria T (DOA) From: Loepp,Victoria T(DOA) Sent: Friday, May 12, 2017 10:15 AM To: Browning,Zachary H Subject: RE: PBU F-22A(PTD 216-163)Anti-collision Since the possible collision point is in the reservoir for PBU F-14, PBU F-14 can be kept producing while drilling PBU F- 22A. Include this approval with the approved PTD. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loeop aa..alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC Is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loeop©alaska.gov From: Browning,Zachary H [mailto:Zachary.Browning@bp.com] Sent:Thursday, May 11, 2017 2:38 PM To: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov> Cc: Lastufka,Joseph N<Joseph.Lastufka@bp.com> Subject: RE: PBU F-22A(PTD 216-163)Anti-collision Victoria, As discussed on the phone the decision to leave wells online or require them to be shut in is determined by a risk assessment of the HSE risks associated with a collision.This offset well fails in the reservoir section,where the expected pressures are equal to or less than the planned pore pressures for F-22A. From our Tolerable Collision Risk Worksheet for F-22A: FOR CID ONLY: is the well a producer that will be left on line? EYes No "'ryes, the below cons The collision point is in the reservoir? lEi.Yes Below the production packer? (ries There is no significant overpressure (No HSE Risk)expected from offset produced zone (d The ResDev TL has been consulted and agrees with expected pressures in offset? id Yet Other mitigations in place and well documented in the well program will include: • Sufficient fluid will be on location to handle expected losses from a collision(min 300 bbls). • Pad operator, rig crews,and all essential personal will be fully informed and ready to shut-in the offset F-14 and handle any losses from a possible collision. 1 • • Key Assumptions for Minor Risking: • If a collision occurred the immediate consequences to the current well (F-22A)would be high losses for a short time to fill the offset tubing,the well would be plugged back with a billet and sidetracked. • The immediate consequences to the offset well (F-14)would be a shut in at surface.Then a non-rig intervention for cleanout and a patch would be able to return the well to service.Assume no surface production equipment damage to F-14 due to drilling mud. Thanks, Zach Browning CTD&RWO Engineer BP Alaska 0:(907)564-5220 C:(907)351-7941 Zacharv.browning()bp.com From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Thursday, May 11, 2017 9:50 AM To: Browning, Zachary H Subject: RE: PBU F-22A(PTD 216-163)Anti-collision Zach, We will review this. The approved PTD requires F-14 be shut in at this time. Victoria From: Browning,Zachary H (mailto:Zachary.Browning@bp.com] Sent: Monday, May 08,2017 4:54 PM To: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov> Cc:Lastufka,Joseph N<Joseph.Lastufka@bp.com> Subject: RE: PBU F-22A(PTD 216-163)Anti-collision Victoria, After taking a close look at the risks,we plan to leave F-14 online while drilling by it with F-22A.This is fully in line with our internal policies and procedures. We can minor risk it because we believe there is No Incremental HSE risk by leaving it online. No tolerance lines will be crossed and we are prepared to handle any possible scenario leaving us with only a financial risk. Factors we considered in the minor risking process: • The possible collision point is in the reservoir, below the production packer. • There is no significant overpressure(No HSE Risk)expected from the offset produced zone(due to faulting, etc.). F-14 expected pressure is^'6.2 ppg EMW. 8.4 ppg fluid will provide-1006 psi overbalance to the F-14 produced zone. • Sufficient fluid will be on location to handle expected losses from a collision. • Pad operator, rig crews,and all essential personal will be fully informed and ready to shut-in the offset F-14 and handle losses from a possible collision. Let me know if you have any questions. 2 • • Thanks, Zach Browning 4 CTD&RWO Engineer BP Alaska 0:(907)564-5220 C:(907)351-7941 Zachary.browning@bp.com The object of opening the mind,as of opening the mouth,is to shut it again on something solid.-G.K. Chesterton From: Browning, Zachary H Sent: Thursday,January 05, 2017 9:54 AM To: 'Loepp, Victoria T(DOA)' Subject: RE: PBU F-22A(PTD 216-163)Anti-collision Hi Victoria, F-14 will be shut in and LOTO during the drilling of F-22A.This will eliminate any HSE risk, allowing it to be minor risked. Thanks,Zach From: Loepp, Victoria T(DOA) [mailto:victoria.loepp()alaska.gov] Sent: Thursday, January 05, 2017 9:42 AM To: Browning, Zachary H Subject: PBU F-22A(PTD 216-163)Anti-collision Zachary, Well PBU F-14 fails major risk. What mitigation measures allow this well to be minored? Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp a(�alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loeoo@alaska.gov 3 17„ 2i (—l4, 3 Loepp, Victoria T (DOA) From: Mclaughlin, Sean M <Sean.Mclaughlin@bp.com> Sent: Tuesday, February 07, 2017 10:26 AM To: Loepp,Victoria T(DOA) Subject: RE: MPD use- Nabors CDR2 rig Follow Up Flag: Follow up Flag Status: Flagged Victoria- The affected wells are: 09-29A—PTD 216-129 03-22A- PTD 216-176 03-24B—PTD 216-165 17-11A—PTD 217-001 F-35A—PTD 216-152 F-22A—PTD 216-163 F-05B—PTD Submitted C-11B—PTD Submitted E-12A- PTD 216-127 E-07B- PTD submitted Managed Pressure Drilling verbiage for all future wells— • MPD techniques may be used to improve hole stability. • An automatic choke will maintain a target ECD at the window for the duration of drilling to improve hole stability. • A pressure schedule will be used for tripping In/Out of the hole.The purpose of the pressure schedule for tripping is to maintain the same bottom hole pressure at the window by applying surface pressure via the choke. • At all times, drilling fluid weight will be greater than equivalent pore pressure. MPD is only being used for hole stability. ***This is the verbiage we will used in future PTD's. Regards, sean From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Tuesday, February 07, 2017 9:15 AM To: Mclaughlin, Sean M Subject: PBU: MPD use- Nabors CDR2 rig Sean, For the approved PTDs that will be using MPD, please send an email outlining the use of MPD. For future PTDs utilizing MPD, please include verbage in the submitted PTD outlining the use of MPD. 1 OF Tye • • ti y \ I//7; THE STATE Alaska Oil and Gas pfy of LAsKA. Conservation Commission �.,..:__ `, 333 West Seventh Avenue ti., GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 '3Main: 907.279.1433 ALAS) Fax: 907.276.7542 www.aogcc.alaska.gov John Egbejimba Drilling Supervisor BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F-22A BP Exploration (Alaska), Inc. Permit to Drill Number: 216-163 Surface Location: 2095' FNL, 2177' FEL, SEC. 02, Ti 1N, R13E, UM Bottomhole Location: 2263' FSL, 2709' FEL, SEC. 35, T12N, R13E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition,the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20,Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy/P. Foerster Chair /ft-- DATED this day of January, 2017. RECEIVED STATE OF ALASKA DEC'OKA OIL AND GAS CONSERVATION COMMI C 01 2016 PERMIT TO DRILL 20 AAC 25.005 l�`'�I C 1 a. Type of Work: lb. Proposed Well Class: Exploratory-Gas IDService-WAG IDService-Disp❑ 1 c.Specify if Wel pro for: Drill 0 Lateral 0 Stratigraphic Test 0 Development-Oil ® • Service-Winj 0 Single Zone ®• Coalbed Gas 0 Gas Hydrates 0 Redrill ®• Reentry 0 Exploratory-Oil 0 Development-Gas 0 Service-Supply 0 Multiple Zone 0 Geothermal 0 Shale Gas 0 2. Operator Name: 5. Bond Blanket ®• Single Well ❑ 11. Well Name and Number: BP Exploration(Alaska),Inc Bond No. 29S105380 - PBU F-22A - 3 Address: 6. Proposed Depth: 12. Field/Pool(s): P.O.Box 196612 Anchorage,AK 99519-6612 MD: 11801' • TVD: 8974'ss PRUDHOE BAY,PRUDHOE OIL 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): ADL 028280&028277 Surface: 2095'FNL,2177'FEL,Sec.02,T11 N,R13E,UM • 8. Land Use Permit: 13. Approximate spud date: Top of Productive Horizon: 99'FSL,2618'FEL,Sec.35,T12N,R13E,UM 87-035 January 1,2017 Total Depth: 2263'FSL,2709'FEL,Sec.35,T12N,R13E,UM 9. Acres in Property: 2560 14.Distance to Nearest Property: 6300 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10. KB Elevation above MSL: 64.54 feet• 15. Distance to Nearest Well Open Surface:x- 652648• y- 5974719• Zone - ASP 4 GL Elevation above MSL: 35.79 feet• to Same Pool: 650 16. Deviated wells: Kickoff Depth: 9645 • feet 17. Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 110 degrees Downhole: 3217 - Surface: 2337 • 18. Casing Program: Specifications Top-Setting Depth-Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 4-1/4" 3-1/2"x3-1/ 9.2#/6.5# L-80 TCII/STL 2901' 8900' 8314'ss 11801' 8774'ss 162 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth ND(ft): I Plugs(measured): I Effect.Depth MD(ft): I Effect.Depth TVD(ft): I Junk(measured): 10034 9271 None 9899 9170 None Casing Length Size Cement Volume MD ND Conductor/Structural 79 20" 31 -111 31 -111 Surface 2654 13-3/8" 3830 cu ft Permafrost 31 -2685 31 -2685 Intermediate 9209 9-5/8" 2369 cu ft Class'G' 28-9238 28-8658 Production Liner 1039 5-1/2" 479 cu ft Class'G' 8995-10034 8459-9271 Perforation Depth MD(ft): 9253-9698 I Perforation Depth TVD(ft): 8670-9018 20.Attachments Property Plat 0 BOP Sketch ® Drilling Program 0 Time v.Depth Plot ❑ Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program WI 20 AAC 25.050 requirements Fil 21.Verbal Approval: Commission Representative: Date 22.I hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Browning,Zachary H from without prior written approval. Email Zachary.Browning@bp.com Printed Name John Egbejimba Q� Title Drilling Supervisor Signature .vl ' 6 ` Phone +1 907 564 4139 Date ' I / 7 O/201 b (((/// Commission Use Only Permit to Drill //� // Permit Approval Number: �l l[ /k7__ API Number: 50- 029-21951-01-00 Date:m coin See cover letter for other requirements: �/ Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shales: L►1 Other: t� _ Samples req'd: Yes 0 No If" Mud log req'd: Yes 0 No Bop 7'55 . 7 3.5c p S f 1 H2S measures Yes I$/ No ❑ Directional svy req'd: Yes III No 0 117-1-v2vlar err v k7.fr� ✓ IDt$/ Spacing exception req'd: Yes No Inclination-only svy req'd: Yes 0 No �,, Z50o `� �s Post initial injection MIT req'd: Yes 0 No l APPROVED BY Approved by: /7/�l COMMISSIONER THE COMMISSION Date:/— — /7 OR1G1AL ' '� ��6 AL Form 10-401 Revised 11/2015 This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit Form and Attachments in Duplicate !2. . 7 44, • • To: Alaska Oil & Gas Conservation Commission From: Zach Browning ♦w CTD Engineer by Date: November 30, 2016 Re: F-22A Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack lateral from well F-22 with a Nordic Coiled Tubing Drilling rig on or around January 1st, 2017. Planned operations: Drill a through tubing sidetrack with the Nordic 2 Coiled Tubing Drilling rig on or around January 1st 2017. A plug will be set pre-rig isolating the ivishak perforations in F-22 and a 5-1/2" Whipstock will be set above the plug. A 3.80" window will be milled off the 5-1/2" whipstock. The well kicks-off at the base of the Conglomerates, and a U-shape well will be drilled targetting reserves in Zone 3/Zone 4. The • proposed sidetrack is a—2150' horizontal Ivishak producer to be completed with a 3-1/2" x 3-1/4" L-80 solid liner, cemented in place and selectively perforated. There are open parent perf intervals above and below the proposed KOP. A plug will be set above the lower intervals and then the liner cement job or liner top packer will isolate all parent perforations.* Rig Work(scheduled to begin January 1st, 2017) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,337 psi). 2. Mill 3.80"window. 3. Drill build and lateral: 4.25" OH, —2150' (12 deg DLS planned). 4. Run 3-1/2"x 3-1/4" L-80 liner leaving TOL at—8900' MD. 5. Pump primary cement job: 33.5 bbls, 15.3 ppg Class G, TOC at TOL (-8900' MD).* P 6. Freeze protect well to a min 2,200'TVDss. p 7D 7. Close in tree, RDMO. *Approved alternate plug placement per 20 AAC 25.112(i) Post-Rig Work: 1. V: Tree work as necessary. 2. D: Liner lap test. 3. C: GR/CCL/RPM log and Perforate. 4. S: LTP set post rig if needed, and test.* 5. S: SBHPS Mud Program: • • • Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (626 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or - Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 4.25" for production hole section from 9645' MD to 11,801' MD. Liner Program: • 3-1/4", 6.5 lb/ft, TCII, L-80 solid liner: 9635' MD- 11,801' MD • 3-1/2", 9.2 lb/ft, STL, L-80 8900' MD-9635' MD • A planned 33.5 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at-8900' MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg (626 psi over-balance). . • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 110°, inclination at kick off point is 42°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property- 6300' • Distance to nearest well within pool- 650' Logging: • MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. • Cased hole GR/CCL/RPM logs will be run inside casing (Post-rig). Perforating: • Perforating planned Post-rig: -50' of perforations, 2.5", 60 deg random phasing, 6 spf, perf guns. Anti-Collision Failures: • None. All offset wells pass BP anti-collision scan criteria. • F-14 is minor risked 1/10. Hazards: • F-pad is considered an H2S pad. Latest H2S reading on the F-22 was 54 ppm on 1/9/15. • 1 expected fault crossing and 1 possible crossing. However the lost circulation risk in F-22A is considered - to be LOW at the fault crossings and throughout the interval. Reservoir Pressure: • The reservoir pressure on F-22A is expected to be 3,217 psi at 8,80Q'.TVDSS (7.03 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,337 psi. • A min EMW of 8.4 ppg for this well will provide 626 psi over-balance to the reservoir. Zach Browning CC: Well File CTD Engineer Joseph Lastufka 564-5220 Loepp, Victoria T (DOA) From: Browning,Zachary H <Zachary.Browning@bp.com> Sent: Thursday,January 05,2017 9:54 AM To: Loepp,Victoria T(DOA) Subject: RE: PBU F-22A(PTD 216-163)Anti-collision Hi Victoria, F-14 will be shut in and LOTO during the drilling of F-22A. This will eliminate any HSE risk, allowing it to be minor risked. Thanks, Zach From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Thursday,January 05, 2017 9:42 AM To: Browning, Zachary H Subject: PBU F-22A(PTD 216-163)Anti-collision Zachary, Well PBU F-14 fails major risk. What mitigation measures allow this well to be minored? Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loeppaalaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loem@alaska.gov 1 TREE= 4-1/16"CIW •WELLHEAD=13-518"Mc EVOY -2 SAFETY NO .***4-1/2"CHROME TBG*** ACTUATOR= BAKER C OKB.ELEV= 64.5' BF. ELEV 37.14' I KOP= 4800' Max Angie= 41° 9700" 20"CONDUCTOR, -110 ' 2200' —4-1t2"OTIS X NP,D=3.813" Datum MD= 9498' _#, Datum TVD= 8800'SS D= " GAS LFT MANDRELS 13-3/8"CSG,68#,L-80 BUTT,I)=12.415' -2685' ST ND TVD DEV TYPE VLV LATCH SEE DATE 11 5 2979 2979 1 PM1G DONE RK ir 16 09/27/14 4 4981 4974 15 MNG SO RK ' 20 09/27/14 3 6430 6246 32 G MAY RK r 0 06/24/14I MN 2 7630 7274 30 MG DMY RK ' 0 06/24/14 Minimum ID = 3.725" @ 8920' 1 8708 8213 29 WAG DMY RK ' 0 06/24/14 4-112" OTIS XN NIPPLE_ 8786' —14-1/2'OTIS X NP,D=3.813" 8814' —{9-5/8"X 4-1/2"AHC HYD SET FKR,U.=3.903" 8849' —14-1/2"OTIS X NP,D=3.813" I • 8920' --14-112"OTIS XN N63,D=3.725" 4-112"TBG,12.6#,13CR-85 VAM TOP, H 8949' I i \— $949• —14-1/2"WLEG,D=3.958- .0152 bpf,D=3.958" TOP OF 5-1/2"LNR H 8995' 8995' —19-5/8"X 5-1/2"TM/LNR HGR,D=4.866" 9-5/8"CSG,47#,L-80 NSCC,D=8.681" -I 9238' {--, , PERFORATION SUMMARY REF LOG:BHCS ON 02/21/80 ANGLE AT TOP PERF:37°@ 9253' Nate:Refer to Production DB for historical perf data SEE SPF INTERVAL Opn/Sqz SHOT SQZ 3-3/8" 6 9253-9293 0 03/18/85 9612' 5-112"MA RKE32 DONT 3-3/8" 6 9342-9362 0 03/18/95 3-3/8' 6 9674-9698 0/R 12/31/95 3-3/8" 4 9674-9698 S 08/22/89 05/23/90 3-3/8" 4 9674-9698 (YR 05/27/90 MID H 9899' 1111111 5-1/2"LNR,17#,L-80 BUTT,.0232 bpf,D=4.892" 10034' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNR ,08/28/89 N-18E ORIGINAL COMPLETION 10/03/14 TLMJND PULL FLUG/GLV GO(09/27/14) WELL: F-22 06125/14 D-16 RINO PEWIT No:'1890620 06/26/14 PJC DRLG DRAFT COR ECTIONS AR ND: 50-029-21951-00 06/26/14 SM PJD FINAL OCE APPROVAL SEC 2,T11N,R13E,2096'F!'L&2178'FEL 08/04/14 DIV PJC I REE GO 08/05/14 RJK/PJC SET PXN PLUG/DGLM BP Exploration(Alaska) TFC= 4-1/8"FMC V1�i F ADR=13-5/8•f OY F -2 3033'NOTES:*'*POSSIBLE COLLAPSED TBG A = BAKER OKB.ELEV= 64.5' BF.ELEV= 37.14' 2096' H4-112"OTIS SSSV NP,D=3.813" KOP= 4800 20"CONDUCTOR, -110 Max Angle= 41"@ 9700 ,092`: -I4-1/2"DSSSV,D=2.62"(05/29/14) Datum MD= 9498' -#• Datum TVD= 8800'SS D- " 13-3/8'CSG,68#,L-80 BUTT,D=123415' '` wl.FTMA -S ST1 MD TVD DEV TYPE VLV LATCH SIZE DATE 4-1/2'TBG CUT(04/25/140 '- 3014' I 5 3099 3099 1 MACCO DMY RK 71-1/2 01/01/06 4-1/2"COLLAPSED TBG(04/08/08 SL DRFT) 3033' 4 5447 5407 27 MACCO DMY RK F1-1/2 01/01/06 4-1/2'BKR PATCH(08/19/06) --6006'-6036' 3 7535 7191 30 MACXJO DMI' RK '1-1/2 2 8704 8210 31 MACCO DMY RK '1-1/2 8551 8337 3**4 MACCO DMY RK '1-112 Minimum ID = 2.313" @ 8956' 8880' -14-1/74MS X NP,D=3.813" 2-7/8" NIPPLE REDUCERS , 8886' H OTIS TBG SEAL ASSY,OD=5.80" 10" 8902' --{9-5/8"X 4-11/2"OTIS PKR,D=3.85' 5j6' X1/2" X NP,' =3.813" t 89$6' 7/8'NP REDUCER,D=2.313"(07/08/06) ::66' ° 2-7/:•""i•-•" PLUG(WM3/08) 8977' H4-1/T OTIS XN NP,D=3.725"E.MD 8979' 4-112'TBG,12.6#,L-80 TDS, H 8978' .0152bpf,D=3.958' 897 14-112"X51/2'XOASSY,13=? TOP OF 5-1/2" -{ 8 8 -'5-1/2"TIWSEAL ASSY STEM ND (LAED IN L44 HANGER TE BACK SLEEVE + +++ ..: , —9-54-4,16464/2"TW LNR HGR,D=4.866' 9-5/8"CSG,47#,L-80 NSCC,D=8.681' - I 9238' I--a .460.4 06041t, PERFORAT10NSt IVAR* REF LOQ BRCS ON 02/21/80 ANGLE AT TOP PERF:37 @ 9253' Note:Refer to Production DB for historical perf data SIZE SPF NTBTVAL Opn/Sqz SI-OT SQZ 3-3/8" 6 9253-9293 0 03/18/95 9612' H5-1/2"MARKER TONT 3-3/8" 6 9342-9362 0 03/18/95 3-3/8" 4 9674-9698 0 05/27/90 PBTD .- 9899' J -1�•1•1•�•1••� ►11111111111114 5-1/2'LNR,17#,L-80 BUTT,.0232 bpf,ID=4.892" --I 10034' �������� DATE REV BY CONNE' S DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/28/89 N-18E ORIGINAL COMPLETION 04/18/08 GIF/TLH CJO TTP(04/13/08) WELL: F-22 09/21/03 C M0fTLP PERF ANGLE CORRECTION 04/27/10 JA/JMD COLLAPSED TBG(04/08/08) FERMI No:'1890620 01/01/06 KDGPJC GLV CIO 04/29/14 JC3NYJMD CUT TBG(04/25/14) AR No: 50-029-21951-00 07/13/06 ORF/TLH NP R®UCER CORRECTION 05/29/14 JLS/PJC SET DSSSV SEC 2,T11N,R13E,2096'FNL&2178'FEL 11/19/07 CAZ/PJC SET PATCH(08/19/06) 06/07!14 PJC TBG UPDATE(TALLY 9/11/89) 04/02/08 CJNYPJC SET TT RUG(03/20/08) Bp Exploration(Alaska) TREE= SAFETY NO.***4-1/2"CHROME TBG*** WELLHEAD=13-5/8"Mc EVOY PROPOS. F-22 ACTUATOR= OKE.ELEV= 64.5' BF.ELEV= 37.14' KOP= 4800' Max Angle= @ � 20"COND, -110 ' I 2200' —14-1/2"OTIS X MP,D=3.813" Datum MD= _ -_#, DatumTVD= 8800'SS D= " GAS UFT MANDRELS 13-3/8"CSG,68#,L-80 BUTT,D=12.415" —I 2685' ST MD TVD DEV TY FE VLV LATCH SIZE DATE 5 2979 2979 1 MMG DOME RK 16 09/27/14 L 4 4981 4974 15 MMG SO RK 20 09/27/14 3 6430 6246 32 MAG DM' RK 0 06/24/14 2 7630 7274 30 MMG DMY RK 0 06/24/14 Minimum ID = —� Co__ 1 8708 8213 29 MMG DMY RK 0 06/24/14 8786' —4-1/2"OTIS X NP,D=3.813" > 8814' —19-5/8"X 4-1/2"AHC HY D SET PKR,ID=3.903" 8849' H4-1/2"OTIS X NP,D=3.813" 111 I TOP OF LNR —I 8900' ":i" --13./0"DEPLOY SL.V IU • I,' --I3-1/2"HES X NPPLE,ID \ 8920' H4-1/2"OTIS XN NP,ID=3.725" 4-1/2"TBG,12.6#,13CR-85 VAM TOP, H 8949' i 8949' —14-1/2"WLEG,D=3.958" .0152 bpf,ID=3.958" TOP OF 5-1/2"LNR —I 8995' 8995' —I9-5/8"X 5-1/2"TM/LNR HGR,D=4.866" _ 19-5/8"CSG,47#,L-80 NSCC,ID=8.681" H 9238' - , 1 3-1/2"LNR, #,L-80 STL,.0087 bpf,ID=2-992" — I-- —I3-1/2"X 3-1/4"XO,D= " 9612' —15-1/2"MARKER JONT 5-1/2"WHPSTOCK(_/ ! — 9645' 5-1/2"LNR,17#,L-80 BUTT,.0232 bpf,D=4.892" — —9646' MILLOUT WINDOW(F-22A)9647'- PERFORATION SUMMARY REF LOG:BHCS ON 02/21/80 ANGLE AT TOP PERF:37°@ 9253' ap JT w/RA TAG Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz SI-DT SQZ 3-3/8" 6 9253-9293 0 03/18/85 3-3/8" 6 9342-9362 0 03/18/95 PBTD — - 3-1/4"LNR,6.EStt A..-80 TC11,.0079 bpf,ID=2.85" 1r)'i. DATE REV BY CONSENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/28/89 N-18E ORIGINAL COMPLETION VVELL: F-22' 06125/14 D-16 RWO PERMIT No: 1 / TD(F-22A) AR No: 50-029-21951-0: 11/14/16 ,1MU BUILT PROPOSED SEC 2,T11 N,R13E,2096'FNL&2178'FEL BP Exploration(Alaska) • i EIn ,. W ig nue `M2 Q= m a CO a a 0 J0. Q a) 1 0) v C •- Lla E N a H a _ N CD t ci m -0 tu N o yN ON (1, E li Z Z a.- g_3 a m °' N C.) I 0 iA 1 COCO 1��W Z 0 � �W m (") 00 0 O O N COc N co cnO V O O °) (D N o0 o cn o. a U 0 Z Q U .,-.- o 0 v O a m a a) N a U V a) C N O. U U V .` 2 O r, J O Q J - � co m U ' O >_ v (i wc O 7 2' U) > O) y J C N N N 0 aS at m a) _▪ 7 a 2 a H 2 aw U N N C 7 O a) -▪ C O 2' a) > J J 0 ° 3 O Qi w V CO C ._ c a U 3 O R O N a) C J J UL U> w drn y m C W2 c .E .2 O N C U rop w u7 3 n .0 '�. o O co O• w a U Q U m y m aT) a « 0 0 0 L 0 CO u re 0 r Z « j, N o w y 0 d 'n J F 2 W a LU CI 0) 0 0 0 L co N O O 0 0 'C Obi (0p O) co CO co 0 L CU 0. n (o at N ) 0) I Q a o r m F 0 C o x a a CL w = a CO it.; j o N o a) m cs L e is v V c o) m z 2• W 3v) E 0 (g� N0 SII L7 ? O c, z ro a co N r >- O CO<, N. at N CO • N a W a p 0 Tr m m 2 a) a H 0 c E . L x N 00 ° CO j a E E. aoN 16 UJ : . m N I- N 01 NN N L CO C N CO 3 3 n O. CO 0 CO Q a) O O O Q, a Y Y & a o 0 o m N 0 m a) Q Q F U) CO N a1 l0 'O O Ci N a) N o > > a Li_ E f Q d d a N z 0 a O O m N N v CO N u >.COaas ¢ O O a ii a a N0 z • « CO O E CO N a Y N N VJ m 0 0 0 CL as 2 + = -O a N N N Q Z Z + } O ` m N N N • Z a a (i (i (i c c ro �a c .' (v iii C 0 c oo O N a) C C O C O V7 it T E •d « 7 « 7 m g " U) co d in Ca) O aOd O C JOo. 2 . ) y CO a ca N F. a . C rn ? CV N 0 di _ 0 0. r0 � _ co aV 12 i \p O . d d d 2 t W .. O ° d N N° al O) U a O 3 3 0 a E t7 2 in in a aa3 2 0 a > > • • ® y O M ) O O OD 0) M N 0 0 N 0 O f0 m W 0 O O O co D r r 0 M 0 0 CO O N n O O n M N N a- O O) O O All_' N co co N co co M M co N (P m a 111161 W j }t01 m bil�O r i,,,, 0 0 0 CO co N Nr 0 n 07 0) a IN 0 0 0 0 0 Q d OO N- OO N- CO CD co n 0 0) M N 0) N 0) N U)V 6 0) O) n O OD n V 0) M (� 0 o n O M v 0) CO 0 IN 0 n CO n 0 M M V V a V co N 0 N- IN CO OD OD 0) 1 0 Q N N N N N N N N N N N N N N N N o y in I O > = 3 a v d 0 I OO D @ NOD N 1 0 co M O O O O O O O O O O O 0 N �j, Q O 0) O o O O O O O O O O o 0 J v U O ,— O 0i N N N N N N N N N N N N Y E ul N O O1 O tL cO J� o N III D O 3 C 2 0 _O U 2 lL N 2 W I,. CD tD n 7 O N OD O O M CO M co n • n CO 0) M M 01 N O R co co co O) co OD OD Nt CO M CD OD N0) O) -0 N6 O) 6 6 o 4 OO N6 O OD 0 m RM M co M N N M CD OD OD O) 0 0 0) C O .- r a- r .- r r- r r e- r N N 2 t C i' N N N N N N N N N N N N N N N I 2 d N N U) OO h OO OO OO (0) co N t0 )1D l0 l0 10 N A O O co O OD CD o t0 CD OD (O CD CD CO CD OO OW ce O d O I' W . V A 'O c V N O 0 (D V co n OD co .- O) co .- 0) co n .- 0 C V W OD n M O O M n N 0 0) N- 0) N 4 �) R w M co co co co V 0 0 O M OO 0 N- 0 w 0 U e j O N V OO m 10 N4 OD O) O) 6Q n o N N d C co 0) O O co O co N co LO CO R R LL) LO OD u C I 't Z .a t o n n n n n n n n n n n n n n J F 'L Z W O C7 a ' p m O 0) r.- 0) 0) rn IN a, o o o N. 0) o Z ui u) ui u) v) N u) in vi u) )n u) v) u) C t 0W O a CO 0- a E . ,_ 0) O O .- M dD OD n N OO 0 a- N M n n N u 3 0 co0 N 0) a- O ? 0) (O O CO Ce IS c IN OO OD fD 0) 0) (D n M 6c0 0 el N N CO0 0) 0) O)c0 c0 a- 0) 0) 0 CO 2 1- ? a V f I I a V C a C? coco 0) G CO - W 7 I- 0 0 CL N co M in n 0 0 0 R 0) N NY CO N in OO OO OO M O OO R M V 0) CO N C') M N O O)OO co d1 4 00 0) 0) n n M OV N co co IN 0) n CD 10 CD V n V CO a 0 E N M M M M v v 10 f0 O n n O m 0) Of Op H �^. N N N N N N N N N N N N N N N 2 _ O 0 Z 19 0 N- Ono .4. V 0) 0 R CO N O) co o 0 0 OO V n .- .- CD CO U) 7 V V M 0 I M CO N C n CO00)) 0 N 0M M 0 0 N lO (O O D7 (A W O O O � � � � '. N N OD co- O W (O 40 O) O OA Q) 0) 0 O) O) 0 LL 0 N O t co EO N n N N. N 0 M n N M N M N U Q CD OO N M 0 OO OD N n v N N Ur N N N M fD N.: ▪ N OD M a- OD �V 0 00 ID 0 0 '- 0 N M M M CO co M O+) O a lL _ a N N _ LL (O ' 2 jo a m o N1 N Y I N Z U l) N N N r lL N- N 0) co co co co OD OO 0) (0 0 O 0 CD N O n O M co n O O O N co m o i0 N- 6 ro m co 0 0 o OD Q 1.: oo o M M C V R a N OD N n CD O) 0) 0) 0) m m o .- I N co N G l0 aa u a. o d CL I- g 4.1 0 — c > > .D ., 'O LL N N • O E CO N N NE u) V) G 2 Z ll ll LL LL a_ ` .0 00 O A O O • 0 O O O O O O O N 0 N O aO O O Y O 7 O O O O O O O O O D) 0 0) o 0 o o O V O V N l0 y 0 N O O O N O O O 1!I O N 1 r OO N N 4 co 40 OHO CD0 •O O 0 0 0 0 o O N JO E / n n (O 0) 0 0 N N M C O N ,-- (I) N M N CO-0) O O) 0 OI W Q) 0I O O O O O O O 0 C N F LL .. '0 r2 .00.. LL U Y W 1q )o n aD CO R VO. g O E T N O 0 2 M d d y D R Off) 0 0 0 CD OO CO 0 CD 0 N 0 0 0 0 O 0 1!) III W f) VCD D QCO C) CD D h O) N D !b O c N O O N O O co O O O O co O O O 0) O'- oo N 'O mom C C7 CO OD CO CO CO CO CO CO V' V V CD 0) 0) CD N V) 0) 0) CD CIO Re ~ o gi Ln co co C) co co co co C) 0) V' N s— N V V' n CO CD V) 0 M a V (O C) V CD CO LO CD N) C) CD 0 CI V: R LO 0 N. CO 0) C o CD V' 6C) (O O 6 V' N CD N N- O V' CD O_ N C) N- 0 C) N CO CD LO N- V V LO C') N N s- N N CD CI 0 0) 0 Z O O s- N N M d m V; o V; LO CO CD n CO CO 0) 0) 0 s- '- N N 0 to 5 fn cev LO Y T. 4 N CND O O O O O O O O O O O O O O O O O O O O CD Q O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O J U L N N N N N N N N N N (Ni N N N N N N N N N N N - O 7 LY 6 r r r 7 C N CD C 2 3 o 3 2 Li H 2 W E, LO o n 0 0 C) CO 0 In 0) 0) N CD CO 0) V 0 CD CO CD CO O) LO C) N 0 CO Nh V) O LO O V' 03 LO O N CO (D 0 V) CO C) 0 0) V' CO V; I` I- CD 0) a 0) C) LO 7 G) '- N- (D O C) N V' 0) CD O N U (D CO 0) O N 0) N si 0) C -8 cm CO n O h n CD r O N CO CO CO Ln LO N Ca V N :,, O C '- s- s- r r s- r �- r r r r O O O 0 O L V N N N N N N N N N N N N N N N N N N N N al 1 w d N ? LD In V) V) V) In LO Ln VI LO In Ln Ln In VI C7 In V) V) LO t!] N LO co co co CD CD CD CD CD CD CO CD CD CD CO CD CD CD CD CO CO CD W W C d O y ._ C C) C) N V 01 C O'6 C Ud 0 N41 0 LO 0 OO0) CO C) 0 0 CD Mm N- V I,- CO CD n N- C) SCO V03 ON N 0 O d 4, ,s N LO CO 0) 0) L) N- O C (0 CD CO V 0) COO w C) U y C) CD O N- C) CD a 0) CO N 0) a 6 C CO Ln Ln (D O 0) 0 C) LY a 107 V) N VV' Ln C)CC t ' N V' 0) 0 0 0 0 0) co 0 I,- CD _ LY d t a C Is-- N. CD 0) 0) 0 s- N N C) V' (O Ln CD CD CD n CO CO 0) To 42 L '�- N- N.:- -t CO- CO- a0 lD m CO- CO- OD (D m m CO CD !b fD a0 2Z rL Z M O 0 0))LO N 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) N- N. 0) N. 0) N. 0) 0) N- , Z N LO to 1!] 1!'1 Ln V) 47 Ln Ln VI N Ln LI] N VI LO 1!) LO V) V) i 0 C1 li 0) C) CO 0 N LO CO .- CD V) 0) CD CO CD In C) 0 V' N Ln I Q) i N — — CD V s- LO N N N N O " CD s- 0 V) '- C) N. 0) R mCD .- co CD V' CD CD 4 N N- V V O) N- 0) LO N CO O O O 0) O O O co co N. N C) V O) '�, 'I 1- 1- 't 't a R Il) Ln u) Ln C 3 co121 g v I— o 0 0 a C) LO C) 0) a CO 0 V' a N v O CO a 0 co co CD 0 v N CD CONN r r h- N V) CO N O '- N O N CI C) N- C) O 7 M O O a0 C) CO V' 0) m M O Ln O) CD m N- CD 0) 0) M r V' CD C) C) V N C) 0 CO 0 0 0) 0) 0) C) CO N- 0) CD CD 1 aa O O ,- N N C) V' V: V) LO CD N N N. CO 0) 0) 0 0 .- N I CC N Ci el C' ca C' CI C) C) 0) 0) (� c') 07 (o c') (o 01 V' v d' C Cl.. Z �. CO In CO 0) N. .- C) s- CD C) CO LO 0 0 0 0 CO N. m 0 01- LO N CD V CO C) s- V) 0) s- 0) O V V V' N 0 N V 11 R 6 O (D O) N CD C) LC) O) (D CD CD CD CD r 0) N O) CO N V) 0 CD V' V' CD h Ln V R V' V' Ln n N- 0 C) 0 0 0 0 0 0) CO 0) 0) CO CO CO CO CO aD m CO CO CO 0) 0) cn to - 0CD 0) m 0 CO- Co Co CO Co Co CO- CO- co- 6 6ao Co co- co- m O a C) N r- CO CD CO 0) N 0) N 0 0) 0 0 Cr) N N V' Iii CD N V) N N- V' CD N LO N 0 C) N CO CD N V) CD 0) CO 'Sr I CD N- N- O N N 0) N- I. CO N- 0) N 0) V' CO O V 1 V V' V] — — V V' in co co LO co co co co co co C) C) co C) co co co co co co� M co , Q 1 C0 m 1 coO) o O03 0) 0) CO CO CO n C) V) 0 0 0 0 0 CD 0 0 O O O 0) 0) 0) 0) 0) 0) 0) V) O O O O 0) CO O O O Q t0 O O 0) 0) 0) 0) O) 0) 0) (O 0) O O O O C) N O6 O co .— O O O O O O O O 0) 0) 0) 0) 0) co N- N N- N I r s- 1- .- .- s- a- .- s- lC U CO 0 --- C03 aLa � �L .O LL N N N N O � CO I a Z 0 CL Ll LL LL 0 CO 0 0 CO 0 0 CO 0 CO 0 0 0 0 0 0 0 0 N- 0 0 cC O coO coC) O O coC) O coC) O O 0) O O 0) O O N- 0 O N T O O) O O O) O O 0) O V O O L)] O O V) O O C) O O N ID C) O O O 0 0 0 aD 0 0 0) 0 0 0 0 N 0 0 .>_' V V' V) C) O N- CO [D 0) 0) O N C) C) V' V) LO O N O O O O O O O O O O 0 C) N E 3 0) CD - N r r r C r r - r r � '- 1-- >.. to `O c w — o N a co \ Uav) 33o 0 I9 . y o � m W CD ;, All fkoZ kti WO T d m km go �, i= — o 0 0 CI m a U CO rn o Z z 71 m CO Q x v a a d 0 W w CC v _ u) 7 Y O )V (D > m Z Q O O O ( ' C N COI x I a) 3 a' y 3 I N O N a) C_ 2 O d 5 2 LL F- W • 0 N CO ro v N- N O CO CCD O O O m O E= CoN N I wN N CO In 0 u) y O (O CD (D D: W C w p R W r C N V dV O • N. CO N O d yw (O C O w wd U W N NC U u °' 01 0) CD 6 aL m a LNa _ O J CO- COF 2 2 (n O O — 2 u) u) u) 0 Q a N r- (1) N co c v Ce Di m m r) co m 0) u) v) u) CL c m = 1 W a I I— 0 0 a CO CO 0 m N r CO u) t0 r ,0 co L CD a) N (o N) I O, ra 2 2 N- N) O N co O N.: M 7 O) co O a) N e co- co- 1 ✓ r- .4- v N u) ✓ r r I u) I N) N) Q — 0 m u) s o O Q o 0 0 r r No CO U T 2 f N m 0 C E o_ 0 m I L a L U LL N O 2 m N N N 1- n Z 0 a 11 U r � o 0 Q iii aoo cocsi d N 0 0 N ` r co_ co_ (N Oto N C C) a mO F t0 O0 U O C N O a y L O) C N E O• ` d d •y RI Oa) c� am33o acv • • 1111 Ma m oo MI is 1 el co sr LIM gm Mil i .4- N m O tr) sr M in co m Lc) sr m co • Q) C O N CO pi O o OI i0 i0 i0 u7 in i0 u1 C C C a C C C sr sr sr sr sr sr si CL Iii 0 O Z C) Q Z Z Z Z Z Z 0 m u7 C M CO u7 0 CO 00 N V CD CO0)co CC O_' Y) M u) M m N D_ ; C u7 _ u) co sr u7 N ig N N N N N N 0 C > 0 J N N N N- m U N u Y E U)) LL C 0 m m N j 'C 0 O 0 0 0 0 0 0 W O O 0 0 0 O O O O O O O 2 LL F ^2 W O l• 00 00) N N UOO CO a0 N M O N- O CO 0 co0to cco N (O co L) co N CO N CO 0) M N 0 n 0 (O COM coGO N OI rn ' c c. c ° u) N YN7 N u) 0 N N N N CO (N N N u u) N N 10 m CO m m m CO u) CO m m CO m N u) CD m (D m )17 m IN ? (O (O (O (O (O (O m .. ui W c C W .c wd m 2 IY c O O 0 O O O O O O 0 O O 0 0 0 0 0 0 0 0 0 O O O O O O O 0 N- O 0 0 0 O N O O O O O O O C 22W 0 ODDOODm O MO u7 O Mo O O 0) co co O 0 co O M CO M 0) O 0) O m C N C (O O 9 C U d O C co N N M N m O) C) O) W 0) O C 4 ` C !� O1 n n m W co- m m N O 0) W a1 4) co- m co- co- n ` w m C N- N r� IN IN N n c0 W N. N IN n CO CO n r- IN N- r- n VN 0 a t C N- CO CO m 0) 0) 0) N N- co 0) 0) 0) N. N- 0) 0) Cr) 0) N 0) m m a �, vi vi vi ui U vi 1.6 iiiui vi u u7 N vi Lc,- ui U) c0 ui 5▪ C G z m 0 J I-2 Z co 0 t 0 0. CC 0) O (O O C C O co O co O M M N O CO 1!] 0) N- O ''i C O N. 0 N 0 T O O CO C m N N- O m M 0) N O 0) O 0) C N n C m M O co m m M O u7 O U) r- O C M CO 0 CO C C N N (O N 0 n N- u7 N- 0 M N (4 M M CO (7 N N N i i O CO I—. —.. o U C 0 N CO C) 0 m W 0 N 0 N C 0 M C M 0 CL m W O Q1 M N N CO CD CO. M O m CO m CD W O C m C O W 0 /� _ _ (y) n O O M O co 'f ) c0 CO n N O m CD m CO m W N un7 0 coM N N N • (D c) NCV N Z h N u) .- •- M 0 C 1- C 0 N 0 01 f a v U v M N_ Z 1" Z I z z CD N z z N N m N . m O N- 0 0 0 0 0 0 cO 0 0 M O O O O co ,iO N O O O O O N 0 O N 0 0 0 0 0 0 CO CO 0 0 0 0 0 IN N- O N 0 0 0 0 O N 0 O O O O0 0 OO N O 0 O O O O O N O O O 0 O O O O- ( -> mm0to ~a > M.... (7 I- M O O N C u) co CO co m O O co C CO co coco C co 0 m 0 co 0 0 O o O CC 00 2 O V) O V)j O .— O O O CC O N O m O O 0 0 a` 3 4- 3 O O 0 0m M •o- ..0 O O 0) n N Off) LL 0 M m m m m U U) r 0 S) o 0 S o o 5 0 S) or, 0U) 0D) oU) oC 0m (J) y O McO O 2 O 0. O N o N o m co r. co La U) n Cc0 0 0 N Q < .°.. co 01 co m coO Omp G d d T T co T N D .0 a a N CO 0 m. d w m m II LL .0 C C C C C L OU U U U U UQ Q 0 IL N N N C C C C C C O co N N N O) DC O1 Ol O) co nZ D O_ LL LL LL P. (p . (`0 ! m i.L d N m N COC u7 m N Co co Cn C) N _ . m m N M v m 0) .- N CO C m N CO.N C C C C C C C C CC M ,(m/_1 C C C C C 07 CC N C C C C C N CC C C °i CC 0 O 0 o 'o 0 o y 'E E o 0 0 0 0 'E „ 'E o 0 0 0 0 C o O E O. >.C 2.a d d LL d d °)C C C C T W LL D_ O_ m C C C 0)LL n. a s 7 m a ,,- N-- >:..c .. Z £ m a m 0 m m.O 10 m 0 m m'O m m O m (C0 0 0 0 a V O C !9 ? t -5-a- ~ ad LL o.0_ < aLL LL ad LL aLL p m _ d d y O)t vi N N N ' N N N ' O V d Vl O != H LL LL LL lL IL IL • • . m 111 Ozia co 1]: m N COco LO (NIin vio a in a ina Ln us Zo Zia a ":1- ¢ a 2 U O z U ¢ ' z z Z I O n MI O N n N I COV CC c 0 = m a a •,:r Lo LO O- H N N N a A> (�Ol Z O O O J V 3 ¢ n U N 0) £ O O O O O O , coO O O O N 0) 2 )i F- W r)Ea • •v) ri co lO 0o )f) N O) • co co O a N U) N 0 LO CO N N N N CO co CD u) CO Ln CO CD COO 0) u .8 C 0 w .c ✓ w rL 00 0 N O O 0 Lo 0 0 (0) O 0) LO N 0) 0) O LO O N l') N 0) y a u N n. N n co O E '0 C U d 5 CO a a) co Co Co = A m C u n N- N v_ u) o o w m y �j ai rn W 0) n N n w m Ca N.- Oa — K L d .o u] ll') us )A In U 0 o C 2 IS o 0 o > 0 0 CO �Y u) N ' c E c m m O U O a O Ce LO LO Lf) co sr Lis I O) joi o of cci m o d c M o r) o m M 0 0 m m rn N a 1 CL N N CO O 00 ' OD (6 m t0 c7 W W W 0 N N N f� I� O co 0D (O cao 0 ', N O N a t0 03 O co Qns V co Z Z Z O 0 f- co a E v o O O 0 a .- co N V' Z 0 0 0 0 N N N 03 0 O O O ci• N N N f7 a rn 0 rn >rn > CO- I I- H co Oa a ) I a cn co of of coY m a co rn m d 0 0 o c o 2 o 2 o a O o Or O , j N V 0 = a N N 0 r r r-- rn i0 0) N O) co a o No m LO CO 70 I , y of CO O 7 0 T O = a w rn rn 0to 0 3 00 2 o o j ; ao ao u) u, O ¢ a N cO O N a.0 >-• 0 0 CD 0ID ou >^ N a) ` d 0 a mmCr �' OmE ) m ¢ a aiU aiU 00 7 o. W 0 j ONN a N N N Cl)U1 0 0 • co N N N O) O) O) 2 03. Z a a lL LL. LL U) U) N Q a _ _ _ _ N N CO a 0) 0 CU 0 ID C C C rp N N N N N N O O O i E d E 0) EC a a a rn a rn -5 0 C .. d .. 1212 07 o N 01'o N 07'o a CO a `) _ a_ m ¢ as aaa a as = o O N N N N Ep Q r N 0) y N N N N O0f c� am33o LL CL a c� • ! y 1 CO CO OaLMIll W m tg o 0 a= m v) cna U 0 Z V Q 0 0 y LY m d V Ln z Y m U (0 OE ct 0 U) N N CU C a Li - W a) Ci C C O 2 .c w d W E LY c W O d C y U U LO '6 U c c d u o y ' m o w ` d U a U m � °fm a r >> a J F g 2 N 8 0 0 0- Cl)Ll) Et 0) a m I— >. >. N N o co co 0 0 O - T CL N 0 O CO CO Cc7c ti 0) co -Q No E Q Q m co r E N N d -60 >O ,a U Li LL YY LLI Ln W N- W 0) o .- N M V Ln W O Q Q Q Q) O O CO N O N (0 N- .- Ln Ln V V N- OD W N 0) N. 0) 0) N N O CO W V N Ln 6 O W W M W W W V V I� N m W Ln W W Wv WN CO W O v O v q LnNn M CO y LV 2 d } R C O o 1 U N (C Ln CO O) N 0 V V N W W O CO 0 jp N CO Ln Ln CO Cr V CO N- Ln W N N N CO u CO N Ln o LU 0) CO — W V' W Ln W D) Ln N O N. CO W N- (C N. 0 (O V CO CO 0) CO O CO Ln -J fA E N CO co co V co N- CO O N V Ln N- 0) O N O) z y N N N N N N N N M co- co- M M CO V V V } 2- 0_ CO N- N- V Cr CO W O O Ln N- CO O O CO N- O CO CO CO V V V N CO N ,- V V •- Ln O 16 z c- W CO W V CO M W Q) N W W 6 N. V U) U V" O N- .- N W O .- .- C- O V CO V V L� V N- E I) d 3 CO CO m m c m 0) C C) C) C CO 0 CO CO 00 CO- Q � o — U >. N I a) 11 coo 0 0 O 0 o O N N CO W W W O O n O 'p o O o 0 o O a) CD CO CO co CO N-0) 0) h %- < Q O d dLO O N (0 N LA O Ln m 0) 0) V N V) M M .- - 'D lL N < < 7481'2 O O V W OM N V W W aW) OCOV N `1,.' O O n N N N Z l Ll 1 Li LL y 0 = °' °) cn m rn o 0 o O O o o in 2 Clcro C N O T (`i IDi c0 QD ��♦� c ., d �'. Y 6 0 a s a m a U S p Q m m s "Ns 00. en 0 d 0 0 9 11 Nf I N v F I laiSi 1 1 N f a0` I 4 • - I oI � — - r / V __-- L __} __-_-1 Y N a - ® -4 I - O F„ r a. r. N , z w 4 ;I 88 } .... au .e. . 43 4 cIl8y a ` N I � vv m ry m e 1 ry N v a m G Y O VJ Ja O _ (� IL O�1i § h 00 n c ch w �e g 1 1 i 1 8 i $ A 0 R + _ o � o (uygsn OOZ)(+iniON/�ginoS ni a i O "' _o 8 .0 mi gg • m.'<4 mil c g 1 m N N N -_ .. c ,-,0-2 . `awwxw,nm,mm ......R 1 1~ b m▪mmmm000�000� 7 , 2�m53m7 �,;,ERRm Ecom E. h 0o m �0 1-, mv ��m M o N LI- > m m o �N N 0 NLL 2 m N N - l O o 0 0 0 0 0 0 0 0 0 0 0 0 0 daLL IL�N., .mo oo - oo 000,rno ___N i � RI , --N--"- o N . -6 .-_----..."--.„."...-_----..."--.„."...c......."-..,LL LL a� m�YYmmm� goM< z - n �����1e -No r aYV4Y' 1- g1- liT."4 il J co��m h D O t';'57317","11727.34: 4'...7,-: Nmu� ,� � o O c 2 Z 21 v v O c.mu en�,monmo r u�m ',,IE ao O NN N N NNN,n ,n,n an v e W m W m m Mi m < g< comm mmrnm0immmm W=c0 O a N Za - „ �, --„, „ n Q a .0omm000g000"-„......-,-m o ti 0 0 0 0 0 0 0 ` c m o _o __ N [�.(] 2Oo Oo Oomm p �o.. �oo<m�� �aimoi<m N ^ 8 b t�f N t m▪m m rn m o 0 0 0 0 0 0....m m m m m m T O. P.- T Zp N�N,,, 'f m mmo�,.i,n R,nm1.- o (uytisn g g)rildau re39.13Aan[ • • ill Mk `W , r T , TO gZ ... - 02 00,8 - o G O r - g Q E , h maam3 .4 a _ A a Ti Mo O O LL N O N LL A uOC r0 � ^ I- LL m o .'• ,C. ,r,„„ O � O '� - N l] r , W 3O 40 mo 3j- - !: Ill $ o J N o a' 3 a - o ,,,R ,,,,4 „ ..§:; a, !,,,„. 1. i i [ . igiieigigorr 1 y,E° 111 1 1k' . aN - � N - m oa <H __ 1 I O a m mu-N N LL d d LL LL� �� ■.,,. c • • q s D ■■■ ■ 1 O 1A iv^ t ■■ -- E ' ^ � LLMEI ^ ^ - \ `7' N s N VC O p 0 C V 4 a Q e ,7, f..., <':-, m M m m N N N N N N N N J (u!/gsn 06) (+)gtuoN/(-)41nos �3 m m 0 0 IP oil NI > m EI' a o > > a > R. > Z m7 5 ¢ y 4 ¢ 5 5 mfW m 9 LL0 LL " aLLa WmmQQLLLLPGO m LL LL LL LL d LL LL LL LL LL LL LL gr a = z 2 moa d U 5U 8 = . 008m -0 E5 >.Qd -11800 c Z 2(-wce in 8 E-88 o 11700 J .c N.0 .0 ~ M >.M(=2 0 c._ c ._ co _ .___._._11600 Qwww „,E 8 5 -11500 O U U -11400 -11300 11200 N N 0n0- O�,-N --- ...-11100 0 O ..O N N2 2 z !F w g Q -11000 - 2OaN - CD W .2 O NLLO 00 - p o ami m - U-. -10900 Z MONiUd O oo o 10800 m w = W m 10700 o,1 y C t EL iG- M n p H kc H 10600 0 --oo 1 _._ _. . -_---- -10500 m DT Q= ....aV_. 2 0.. 75 =* -_--- -10400 A0 MI �j Y -10300 co IL - 0- ` MI _ 10200 oa < a. V LL N N N aaLLLL N 10100 .. .. •• N N a v« m N �N _� N .. ---Ll.... U- t -__. -__. -- -10000 O` LL a m _9900 a 9800 a i 9700 E00 o 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 a 9500 o co co Y N O CO f0 Q N O co o o• N O COOCO V I N G Q lh CO M l7 CI N N N N N (ui/usn OZ)uoileJedag aJluao of aqua° • 0 "gvNr arWO v,om 8 m W vW o'-a p _ - O O . u1 NainiOOOrWmMapNI�<tVO6 >M,O,-VOOWWnu �.-WM.-O .4VVAmpONOWWtT,-MM N N N O N N N N N M M M M M M O P< N 1.Ig N 224288388888888888 O M N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 _ O<W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 L'W LLo�ro O�oou>00000000 —'! v W � N M M M T t 7 O i T T�W W O�W O W M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p V s� O NO?00000000000000 36,-66 N N N N N N N N N N N N N S 3 W F88`,288:1“.2`.=' N N�O X 66644 r:ryy I a �U 3 O 'W W W 66666 M ap 5� vgaae Mvveo vvva v"i v"i p ff O c0 0 s A m I4 N W 7 WnN M V V N`,E2 O O N°-'N r N M • A o. e2 � .NC WOni N'?ocs;tMGOihhM a g ' 14 O (n,,•:: Nymai VINONWMO QM MnMO V a E N C7 �4O ' Nv. O O co O Nm ARa °• _4,'y..... O O O O t0 10 O U pnnavWrnae•inr-66666,rom$N N N>cl a•1a -. cmv -.oao ~0n� Wnoad �m. . 1E - LL C40o ”,. , QO W �'r N po-Ch.) mm m m m rn rnm MFWmWW WWW G; 'A CV CD Ggao U d. S -a'Q0 ?U OWNNV,„NNNNWNOmm-- Q NM mNrNNNNO,V.. 8 1=0� O) oV C m MM-M1�aU.-.-rry n:44 MannO O2 W -' A.-M MMMia d p � OL d U CMM COa9 CO J: 1 LL b03 N r§W 5ANWWMO.000TWn000-�0 =° ODromoooo uSD_ i+ Wmoenroo.9 SI OErg oodo A a 0ot pO 3 J• L d L R L 'o O o O m m 22 M n m rn n n, -Ny O oaro.-.-M m NNO N N W �U�tn� a�°rnmmaoao�Oo' nm t7 N CI 1)iFtucnw yLS Q 5M•-NMOWWAWO. 0 'im°' m 0 Zm� - v 2LLdk a U op p 0 OO O CO 0 °'a ,0ggq •2O O 0( _ iLu 4 CD Z LL LL,4_LL, 1 m 4 4 4 # # A A h 4 ,,, } a di N`.▪ 1' Q O O O O V O co O V _ 0r....L.L 1-.- Lo co a / C Loos -2ON LV CO NLL u fA• 0 c C J = 0 03 U Q O L d as c.E W a) 1- o m-i O Q 7 m _ N 15,- N v— CD D 0 U H • 0 0 0 0 0 0 0 0 - - - 0 0 0 0 0 0 M co r m< vi v C9 N in CO n co co O 0 0.0 -/(.. O co O C4 o 0 _ O C".4 rn rn N O LA N ,.,:N In W O U O N 7- • R QU. CD yLL N c c N +.-. ` m N N co C a) a LL LL a O 4-1 a M _ 3 RI •v Zc N • aa�y fh W N C .92.0 a a, O aa "CP N = a•- N E d c N a_ ,_.) . .„ ._ Nco O (, o ...24, 6w.gm60 C O gOO O6� Og a � a a a a •V O aas ? Zd O aco 9 O W W U in tL= 00C,m U mU tc U L O ao O n a,0 rabtV Om 3< mup cm0 M OM OcoN Of0N ON s gNi - V � Om d c= •-• c".Nr-m,, _L - • • 0 bp North America - ALASKA - BP Prudhoe Bay PB F Pad F-22 500292195100 F-22A F-22A WP02 Travelling Cylinder Report 29 November, 2016 BAKER HUGHES I • 0b BP Gag pTravelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-22 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB F Pad MD Reference: F-22 OKB @ 64.54usft Site Error: 0.00 usft North Reference: True Reference Well: F-22 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore F-22A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-22A WP02 Offset TVD Reference: Offset Datum Reference F-22A WP02 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 100.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,377.27 usft Error Surface: Elliptical Conic Survey Tool Program Date 11/29/2016 I From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.04 9,500.00 1 :Schlumberger GCT multishot(F-22) GCT-MS Schlumberger GCT multishot I 9,500.00 11,801.10 F-22A WP02(F-22A) MWD MWD-Standard I -- -J Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,685.00 2,620.36 13 3/8" 13.375 17.500 9,238.00 8,593.67 9 5/8" 9.625 12.250 9,645.00 8,913.34 5-1/2"Planned KOP 5.500 5.500 11,801.00 8,973.95 3-1/4" 3.250 4.250 L --_ Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design 9 (usft) (usft) (usft) (usft) PB F Pad F-05-F-05-F-05 4,270.46 4,600.00 152.85 65.20 88.27 Pass-Major Risk F-05-F-05A-F-05A 4,270.46 4,600.00 152.85 65.20 88.27 Pass-Major Risk F-06-F-06A-F-06A 10,925.00 10,900.00 791.64 516.41 297.94 Pass-Major Risk F-10-F-10-F-10 4,658.13 4,800.00 472.24 100.84 371.54 Pass-Major Risk F-10-F-10A-F-10A 4,658.13 4,800.00 472.24 100.84 371.54 Pass-Major Risk F-10-F-10B-F-10B 4,658.13 4,800.00 472.24 100.84 371.54 Pass-Major Risk F-10-F-10C-F-1 OC 4,658.13 4,800.00 472.24 100.84 371.54 Pass-Major Risk F-10-F-10CPB1-F-10CPB1 4,658.13 4,800.00 472.24 100.84 371.54 Pass-Major Risk F-11-F-11-F-11 5,328.71 5,400.00 148.83 129.43 42.31 Pass-Major Risk F-11-F-11A-F-11A 5,328.71 5,400.00 148.83 129.43 42.31 Pass-Major Risk F-11-F-11 B-F-11I3 5,328.71 5,400.00 148.83 129.43 42.31 Pass-Major Risk F-13-F-13-F-13 7,161.52 7,000.00 611.45 150.47 461.16 Pass-Major Risk F-13-F-13A-F-13A 7,161.52 7,000.00 611.45 150.47 461.16 Pass-Major Risk F-13-F-13B-F-13B 7,068.53 6,900.00 623.59 157.71 466.01 Pass-Major Risk F-13-F-13BPB1-F-13BPB1 7,146.67 7,000.00 611.31 150.31 461.10 Pass-Major Risk F-14-F-14-F-14 11,168.78 9,900.00 512.92 9.96 512.60 Pass-Minor 1/10 F-18-F-18-F-18 3,473.06 3,700.00 397.96 61.90 336.18 Pass-Major Risk F-18-F-18A-F-18A 3,476.32 3,700.00 398.09 61.97 336.27 Pass-Major Risk F-18-F-18AL1-F-18AL1 WP05 3,476.32 3,700.00 398.09 61.97 336.27 Pass-Major Risk F-18-F-18AL1-01-F-18AL1-01 WP07 3,476.32 3,700.00 398.09 61.97 336.27 Pass-Major Risk F-19-F-19-F-19 3,310.67 3,500.00 125.84 60.36 65.65 Pass-Major Risk F-19-F-19A-F-19A 3,314.89 3,500.00 124.49 60.44 64.15 Pass-Major Risk F-19-F-19B-F-19B 3,367.83 3,600.00 124.32 61.57 63.52 Pass-Major Risk F-21-F-21-F-21 3,592.03 3,600.00 57.88 56.89 0.99 Pass-Major Risk F-21-F-21 PB1-F-21 PB1 3,790.75 3,800.00 54.63 54.04 0.69 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 11/29/2016 9:56:41AM Page 2 COMPASS 5000.1 Build 81B • • BP rI/11111 0 p Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-22 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB F Pad MD Reference: F-22 OKB @ 64.54usft Site Error: 0.00 usft North Reference: True Reference Well: F-22 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore F-22A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-22A WP02 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB F Pad F-22-F-22-F-22 9,881.08 9,900.00 59.85 5.68 59.85 Pass-NOERRORS F-22-F-22A-Plan F-22A Out of range F-23-F-23-F-23 3,296.25 3,300.00 134.51 52.88 81.63 Pass-Major Risk F-23-F-23A-F-23A 3,296.25 3,300.00 134.51 52.88 81.63 Pass-Major Risk F-23-F-23B-F-23B 3,296.25 3,300.00 134.51 52.88 81.63 Pass-Major Risk F-24-F-24-F-24 1,392.21 1,400.00 229.05 25.88 203.17 Pass-Major Risk F-24-F-24A-F-24A 1,392.21 1,400.00 229.05 25.88 203.17 Pass-Major Risk F-24-F-24APB1-F-24APB1 1,392.21 1,400.00 229.05 25.88 203.17 Pass-Major Risk F-33-F-33-F-33 1,295.56 1,300.00 161.37 21.57 139.83 Pass-Major Risk F-33-F-33A-F-33A 1,296.66 1,300.00 161.40 21.61 139.82 Pass-Major Risk F-33-F-33APB1-F-33APB1 1,296.66 1,300.00 161.40 21.61 139.82 Pass-Major Risk F-34-F-34A-F-34A 3,930.87 3,999.98 607.55 53.10 554.44 Pass-Major Risk F-34-F-34APB1-F-34APB1 3,930.87 3,999.98 607.55 53.10 554.44 Pass-Major Risk F-35-F-35-F-35 3,296.10 3,300.00 49.60 54.02 -4.41 FAIL-Major Risk F-35-F-35A-F-35A WP05 3,296.10 3,300.00 49.60 54.02 -4.41 FAIL-Major Risk F-42-F-42-F-42 2,795.51 2,800.00 204.05 41.01 163.05 Pass-Major Risk F-42-F-42A-F-42A 2,795.06 2,800.00 204.05 41.00 163.05 Pass-Major Risk Offset Design PB F Pad- F-05-F-05-F-05 Offset Site Error: 0.00 usft Survey Program: 100-GYD-CT-CMS,9500-GYD-CT-CMS,9650-CB-GYRO-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Tooltace+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usff) (°) (usft) (usft) lin) (usft) (usft) (usft) 108.62 44.08 100.00 43.89 0.17 0.05 -137.87 -777.32 -703.08 18.062 1,048.13 2.99 1,045.14 Pass-Major Risk 212.51 147.97 200.00 143.88 0.34 0.19 -137.92 -778.84 -70325 16.062 1,049.16 4.93 1,044.23 Pass-Major Risk 316.09 251.55 300.00 243.86 0.66 0.28 -137.99 -780.77 -703.18 18062 1,049.96 7.21 1,042.76 Pass-Major Risk 416.70 352.16 40000 343.84 1.09 0.38 -138.06 -782.84 -703.22 18.062 1,050.78 9.77 1,041.01 Pass-Major Risk 519.48 454.93 500.00 443.80 1.50 0.49 -138.14 -785.65 -703.57 18.062 1,052.17 12.40 1,039.78 Pass-Major Risk 620.44 555.88 600.00 543.74 1.70 0.60 -138.23 -788.93 -703.78 18.062 1,053.62 14.34 1,03929 Pass-Major Risk 71806 653.50 700.00 643.70 166 068 -138.33 -791.90 -703.76 18.062 1,054.80 15.43 1,039.38 Pass-Major Risk 818.11 753.54 800.00 74367 1.70 0.76 -138.39 -794.13 -703.73 18.062 1,055.51 16.79 1,038.73 Pass-Major Risk 917.65 853.08 900.00 84366 1.68 0.85 -138.42 -795.61 -703.81 18.062 1,055.75 17.98 1,037.78 Pass-Major Risk 1,015.78 95120 1,000.00 943.65 1.42 0.95 -138.45 -796.70 -70367 18.062 1,055.66 18.49 1,037.18 Pass-Major Risk 1,113.32 1,048.74 1,100.00 1,04365 1.30 1.05 -138.49 -797.49 -703.24 18.062 1,055.38 19.38 1,03601 Pass-Major Risk 1,21245 1,147.87 1,200.00 1,143.65 1.49 1.14 -138.50 -797.97 -702.98 18.062 1,055.12 21.22 1,033.91 Pass-Major Risk 1,311.62 1,247.04 1,300.00 1,243.65 1.84 1.21 -138.48 -798.26 -703.11 18.062 1,055.07 23.49 1,031.59 Pass-Major Risk 1,41169 1,347.10 1,400.00 1,343.65 2.17 128 -138.46 -798.65 -703.03 18.062 1,054.99 25.70 1,029.30 Pass-Major Risk 1,511.38 1,446.79 1,500.00 1,443.65 2.26 1.34 -138.46 -798.98 -702.52 18.062 1,054.58 27.14 1,027.45 Pass-Major Risk 1,611.23 1,546.64 1,600.00 1,543.64 2.35 1.33 -138.44 -798.95 -702.35 18.062 1,054.15 28.36 1,025.80 Pass-Major Risk 1,710.56 1,645.97 1,700.00 1,643.64 2.49 1.30 -138.38 -798.91 -703.01 18.062 1,054.32 29.69 1,024.64 Pass-Major Risk 1,811.34 1,746.75 1,800.00 1,743.64 2.36 1.32 -138.32 -79928 -704.10 18.062 1,055.05 30.36 1,024.70 Pass-Major Risk 1,911.65 1,847.06 1,900.00 1,843.63 213 1.38 -138.29 -799.83 -704.99 18.062 1,055.75 30.86 1,024.91 Pass-Major Risk 2,013.35 1,948.75 2,00000 1,94363 2.06 1.45 -138.26 -800.44 -705.73 18.062 1,056.30 31.89 1,024.43 Pass-Major Risk 2,116.34 2,051.74 2,100.00 2,04362 2.19 1.52 -138.22 -801.19 -706.55 18.062 1,056.78 33.53 1,023.26 Pass-Major Risk 2,218.24 2,15364 2,200.00 2,143.62 2.41 1.62 -138.19 -801.83 -707.09 18.062 1,056.74 35.49 1,021.27 Pass-Major Risk 2,318.89 2,254.28 2,300.00 2,243.61 2.52 1.72 -138.16 -802.39 -707.27 18.062 1,056.28 37.13 1,019.16 Pass-Major Risk 2,417.26 2,352.64 2,400.00 2,343.61 2.58 1.78 -138.16 -802.85 -706.92 13.562 1,055.49 38.08 1,017.42 Pass-Major Risk 2,518.33 2,453.70 2,500.00 2,443.56 2.76 1.80 -138.27 -803.65 -703.99 13.562 1,053.19 39.72 1,013.48 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 11/29/2016 9:56:41AM Page 3 COMPASS 5000.1 Build 81B • • . Northing(200 usft/in) 1.g.W 658600- 3 n jOG. "' " " u' -656600 UMW LL sz 656400-4. 0 -656400 a 43 656200-1 -656200 -656200 Lo a6 C.Q. a 658000_ 00_ o • '6 -656000 .- 7 :733 LL- •e' 0 655800_ �y0 u` p00 _855800 655600_ �q p -655600 p00 •\'`''655400_ ,..93 _655400 1Epp a 1 0. m 655200- n -655200 h o e z m '� Opp y00 o 655000_ `"� m 6 6. LL 865000 o 1 u, a LOL6 ,00§ �62, 3 s� 6LLB �. nLL CPO . O0 854800- 1. o .1 \654800 7 §s s 2LL t g °,§ 654600- SE@: LL 000 O00 CO -654600 tgiiit g.,1 y 654400_ - o. -854400 pN$� 00 • y 654200- - Q �` 6 -654200 °S` � O _654000 654000_la ®. y00 .1.-,- C 653800mo 4 -653800 pO c p0 0 O O p LL O 00 0 <•P ,6' � N o0 653600 m O r Q09, :-3600 0 NO -.,".. ..... N O 0 0 h a N LL rn 653400- `-t I 'e. �.. o O C "- 653400 •.-- S f- , m 0 0 O W N o 653200- - ;'00 0 to g _ ^O O -653200 .. c 653000-. N LL rn. O-fi53000 CO m pNj ji.� off. 00 e wa. o 0 c 652800-. ' - I o0io - 652800 a 0 n N • o O d N ¢'.'2. 4�g�� 652600-em / O •opo 0 O O 41 O % _ 5� Q OOSL a N o o• •n -652600 g gsiM w n CD 3 a N . -'..— o w 114111 6524008 N oyp�. oo O '®�� O -652400 b ^ N o o O o N Nco:::i - -�' r N • -I_ 652200�• 0008?, O O G? %. g 652000 0 O 651800- P�! o -651800 I i V 651600- L ® OOSB L�O o _651600 7 coLL O u. "`..p,, O SOS O 6514QQ- a ` S 00 3 . -651400 o LL. 0.; ,,u--,_ L r °� - ,8 LL 651200 Q _ �� ° 4851200 c m ,A �0 O3 `to 0 �6 @ -651000 m y 0 651000- N d1 9 O 8a o 0 N In 4 650800- •n'N o _ ° .O 3 00 O -650600 t i Y S 650600- ° r-, -650600 a sS.II000, s LL 3 33ry` 650400- °00 -650400 $ LL 1 650200- 0. .. -650200 o m 0 °° a 650000_ LL O � °Se.... 09. _650000 O 4 N 649800- -649800 m 649600_ 1L 005,0 - _649600 i�_ °p0 649400 :623 g3 649400 O a orl 649200_ Q N N °°0 LL / _649200 Na LL 649000_ N cv. _649000 m NLI LL J 0 g (u!Rlsn OOZ)6UI2SON • • 0 bP North America - ALASKA - BP Prudhoe Bay PB F Pad F-22 F-22A F-22A WP02 Plus 500ft MD AOGCC Offset Well Report 29 November, 2016 r' u BAKER HUGHES • I • h S� up Anticollision Report BAKERFARO HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-22 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB F Pad MD Reference: F-22 OKB @ 64.54usft Site Error: 0.00usft North Reference: True Reference Well: F-22 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore F-22A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-22A WP02 Plus 500ft MD Offset TVD Reference: Offset Datum Reference F-22A WP02 Plus 500ft MD Filter type: NO GLOBAL FILTER:Using user defined selection&filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 9,500.00 to 12,301.76usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 200.Oousft Error Surface: Elliptical Conic Survey Tool Program Date 11/29/2016 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.04 9,500.00 1 :Schlumberger GCT multishot(F-22) GCT-MS Schlumberger GCT multishot 9,500.00 12,301.76 F-22A WP02 Plus 500ft MD(F-22A) MWD MWD-Standard Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well-Wellbore-Design (usft) (usft) (usft) PB F Pad F-22-F-22-F-22 9,818.04 9,825.00 30.20 F-22-F-22A-F-22A WP02 11,800.00 11,800.00 0.00 11/29/2016 11:04:05AM Page 2 of 6 COMPASS 5000.1 Build 81B • • _. _ ._ . . Atom 1 1 I 1 0 Oi Uf ,, ir I 1 i i 1 / C. 1 ! S S • . , 1 I .AIAb,_ �e4 . I wr— 1 ti 1 I, a- r iMil I r \}r\\\\\\\\\\\\.. -ff�� I I a 2 a s m x I — c 1 j,, I 2 y g x I I v a 3 I a a 1I o V , i CM, I I O 0 --t— I .. I 1 1 i I Z I I O 12 I z ®I I F I - U Q u^ U i •1 I aull Jalsne seg Trr dF 8 1 111 a I J Ins �f a :1 I Ce . a I 1 \ v m x I • U_ 1 Irc• I \ . W ia: .0. .• • I• x Zy !Z' ' 1 1 "••••02, i:0: 2 .•••• cl r.. la;- a : 1 LLI ", e OI i O VC 2 a e •1 �� U a \\\ N„ f 4 "2 ¢ v 0 \ 1. ' F n u u n 2 U = 2 2 a 1� n I O• o — 1 2• 2 �I I Z z ,,, I .II A I g 0 i i MI 2 io '8 .tgis _, j C I i E a,E V I r r.f 1 ° U I G I .,I I ••I ■Q n I I 2 2 • • Loepp, Victoria T (DOA) From: Browning,Zachary H <Zachary.Browning@bp.com> Sent: Thursday,January 05,2017 9:54 AM To: Loepp,Victoria T(DOA) Subject: RE: PBU F-22A(PTD 216-163)Anti-collision Hi Victoria, F-14 will be shut in and LOTO during the drilling of F-22A.This will eliminate any HSE risk, allowing it to be minor risked. Thanks, Zach From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent: Thursday, January 05, 2017 9:42 AM To: Browning, Zachary H Subject: PBU F-22A(PTD 216-163)Anti-collision Zachary, Well PBU F-14 fails major risk. What mitigation measures allow this well to be minored? Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp(a�alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victorialoem@alaska.gov 1 • • OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. • TRANSMITTAL LETTER CHECKLIST ..----zzi,/ WELL NAME: (}67_, t___ ,_ PTD: 2,-/4, -" 76 3 /Development Service Ex lorato Exploratory Stratigraphic at graphic Test Non-Conventional FIELD: FIELD: r t-� ' e_f ) POOL: ,c l .(4 Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 • 0 -1 ToN CT 0 O 0. , CO _) a) ❑ o m U' TD E Q 0, E: c y' _: p. 2t : 4 a 0, 0' 0 (6: O a) O J O: C aU. M 2 m ° W o co L co -p a) ' O' o 3. Oct c p, a 0 ° 0. co IP o'' of y ate) 3: , d' a) rn a' ,� o f6 �, �: a) a .c - c �' 0 o N H: c0 t: 0 v' E, W' o �: a 0. t 'E' D. i NO' a, C' y' : C• a)' pa_ O' N : (/> oo: O. •p Q � 0' a � N, U' o O y m S. CO. �: C' �' W 5, O: -, c' N' )y, T coi: o'' T o- 4 o' ci E. o, o: U) cd ' �' a1' co E, .pn .c, a' y' D co au'), re �, a m' c a), f6 a y ' 5; 0, •o ami a 3 C' c' C a), co g. ami _ E. 0 0 - O u c �' o' 0' '� a>). _' 0' of �' €': N, co c' T) v' � E: Z a', 0 Q'. V' ' �, c: , O, 2) 1: C: al a: N� d: _co p a W (n' a U 0' M' U' co u> a a' a' < 2' 2 S a' a' o to a LU U) U) U) U) U) V) U) U) U} U) U) UY - co UD U) U) U) U) U) co U) U) (0 (/) Q Q a), a), a), a), a), a), a), a), N, a), a), ca Q. Q, <C <C Q, Q Q, a), a), a), N, a), Q, a), a), a), a) a), a), Q, ' O, a), Q, Q, Q a z z; >- � >-, � >. >- ) � � >-, >-, r: Z, Z, Z, Z, Z, Z, Z, � >-, >- >- >- z, >- }: � r }: >- Z, z >- Z z, z T a) Nc o 0 Uj E . E, 3 To — ° C 0 0 O•uJ ay . T >S ,- a E C L O. o °, oa)' U O 0 c 0Z, co o ❑ Q•. a'' tt1ll a rn aD, cC.' C a) Q ki 0as °0 T C E o, 4°) -hl O. y, a M, 00' a. -pp d' to m Z o' L 0' 0 N' m �: 3. �' r' xS, E m 0 'S o o O c 0 ti a) °) Z' (/) C y 7 - 7' Q U) w a) a) m W v' d C .0 O a)' C v COCU a) a ' D, O ` N m: o O 07 a) a •C' c c N o p • O M' = a) .-. > w c' C �� C 04 N' w u1 w N d N' L d c E; E o. c, c E 0, 2' o c in '� .. CO C' c, o aa yr o S u> o o -o = • ao 0 0 ., c o' ° rn O • 'm a 0. y, 0 ° •y a, ° - 3 O >' m T m_N ❑ Q• ,k' , c U C, ..�' p' ° ° c' a' c -o a) c a) 15 Q, m. 0 co -0 O. 0) O' N: a) V) D <C o a' O' a) a) C' o 7 7 ° v as' Y ' O p' 0 E; f0' (0' a' >, w . r J 0, 0, E 4 c' c' a m, ••c- a' o' o' ,,, c a�' io CO�' c� a o' fl Eco 3 E 2, C v: c...a. :a, m' a a .- .L.' .L.,' -, co ca, -O N, a) i c, to o a -0 c cn y' •m' y' -o as 3, 3, m' a0), ) .. P � •�, =. 0I,> ` > OO y O' N' 0 o O. — c v' O U)' Z a), D_ C' v OL' a) a) a.. CO O' p N a) O of E O :?' �' O Y. a) O O y v' E a) 0 E L O a) D w y. c' H °' a) 0. -0 a) 0' a' U: 0, p: a C' a 0 o. O' a) a) — v a) ,- a)' -p N' E' co 0' . (T .O c C' O' o o(f �' t' N a)' @ O, a O a) '�' a cco co a •L: ; a): a f0 — - @, O) 0: O 0 0) c' U' 3: •N: 'c' y' p. N' c• L: v O U' E' O' O: o, 3 0' a), G c 0) p. p: L. co -a 0 a p. 0 'm' v: S. c . -°, •co O' o. TD 0 0) 2' N: C' C, a 0. 2 U) >. U) d, �' a: 3 L, -0. .= = C c c >, : L. NEl. 0_ _L-' U): Z- e,U O p d' a) >` -p p' / E iv' a v v' 0 c 0' v ur 'y: v v o U) =° 3' m a w •c 0 a) c 10' c' E' If X c 0' E a)' ) .p.' ..' N v 0 .c N, c ✓ >§ p' O 8, 0 0 0' N a) _� a) 3 N' a7 0 V _V' c N, C0) co I W� c, 2 c, 3' 0 cTo oi' o m a� 0 0 0 0 E' of 0 v v a) o o. v 0 $: 0: a� a E ac) C 0' �' o a)' O O' O' i6 .. .. a) O' O 0 U > > 3 CD p 0 v' a) W' N 3' U)' CD w, 0. a) m J m'I ccc, E, m, v �, �, m , as a`) m,3 2 E E' c m 3, y c, 't H H I- y, Cl) E.D. aG >; 0. a o o a 0, E. 0, .D, m, c o T o 0 a�: E' °' v n a a`) ai co o 0 2; M, 2 0 'p: 0 a' ''0 = O: O, _ a) a) 0: a) a): o, m z a J D �; �; �; CO ', 0 O. a; a; U 5' Q' a UUC.) 00C) < '= Q , o; mmU5 �; a; a, 0u)LO0, ❑ �� W 0CO_ I E n O N M V t0 CO Co m 0 N M -7 LO CO h 00 O O N M u) h 00 Cr) N co V• co co r- Co CA ,- ,- N N N N N N N N N N M co co M M M M M M M C1 0 U m EO c .o+ .O. N .p+ 0 Cp Ix co o W cc) . 0 . e CZE CL J N V! a) 0) U o c " a Q a