HomeMy WebLinkAbout216-175From:Lau, Jack J (OGC)
To:Oliver Sternicki
Cc:PB Wells Integrity; Michael Hibbert
Subject:RE: [EXTERNAL] Re: NK-15A (PTD# 216175) Request to flow under evaluation with TxIA comm for economic
evaluation
Date:Thursday, June 5, 2025 9:12:30 AM
Good morning Oliver,
You have approval to produce with gas lift for the under eval period. Please ensure the
well is monitored for any additional signs of ann comm including IAxOA while online.
Thanks,
Jack
From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com>
Sent: Thursday, June 5, 2025 8:25 AM
To: Lau, Jack J (OGC) <jack.lau@alaska.gov>
Cc: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>; Michael Hibbert
<Michael.Hibbert@hilcorp.com>
Subject: RE: [EXTERNAL] Re: NK-15A (PTD# 216175) Request to flow under evaluation with TxIA
comm for economic evaluation
Jack,
Ops has been trying to flow NK-15 since 5/30/25, but have not been able to get the well
unloaded. We had previously assumed that we wouldn’t need gas lift on this well, but it
looks like we will. We would like to request approval to use gas lift for this POP UE
period on NK-15.
Thanks,
Oliver Sternicki
Hilcorp Alaska, Hilcorp North Slope LLC
Well Integrity Supervisor
Office: (907) 564 4891
Cell: (907) 350 0759
Oliver.Sternicki@hilcorp.com
CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders.
From: Lau, Jack J (OGC) <jack.lau@alaska.gov>
Sent: Tuesday, May 20, 2025 4:16 PM
To: Oliver Sternicki <Oliver.Sternicki@hilcorp.com>
Subject: [EXTERNAL] Re: NK-15A (PTD# 216175) Request to flow under evaluation with TxIA comm
for economic evaluation
Oliver,
You are approved to produce NK-15A for up to 45 days under eval for economic
evaluation of a RWO.
Jack
From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com>
Sent: Thursday, May 15, 2025 10:12 AM
To: Lau, Jack J (OGC) <jack.lau@alaska.gov>
Subject: NK-15A (PTD# 216175) Request to flow under evaluation with TxIA comm for
economic evaluation
Jack,
NK-15A (PTD# 216175) is currently not operable since 6/21/23 due to failing a MIT-T. The
well was secured and a subsequent LDL on 6/23/23 found holes in the tubing at 7930’
and 11120’ MD with a LLR of 0.5 bpm at 2500 psi. On 5/14/25 the well passed a CMIT-
TxIA to 2834 psi verifying a competent secondary well barrier. Hilcorp would like to
request permission to place NK-15A on production for up to 45 days to evaluate
economics in support of a rig workover to replace the tubing. Gas lift will not be needed
for this operation. IAP will be maintained below MOASP of 2500 psi and the well will be
secured at the end of the evaluation period.
Regards,
Oliver Sternicki
Hilcorp Alaska, Hilcorp North Slope LLC
Well Integrity Supervisor
Office: (907) 564 4891
Cell: (907) 350 0759
Oliver.Sternicki@hilcorp.com
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the
onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
From:Lau, Jack J (OGC)
To:Oliver Sternicki
Subject:Re: NK-15A (PTD# 216175) Request to flow under evaluation with TxIA comm for economic evaluation
Date:Tuesday, May 20, 2025 4:15:35 PM
Oliver,
You are approved to produce NK-15A for up to 45 days under eval for economic evaluation of
a RWO.
Jack
From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com>
Sent: Thursday, May 15, 2025 10:12 AM
To: Lau, Jack J (OGC) <jack.lau@alaska.gov>
Subject: NK-15A (PTD# 216175) Request to flow under evaluation with TxIA comm for
economic evaluation
Jack,
NK-15A (PTD# 216175) is currently not operable since 6/21/23 due to failing a MIT-T. The
well was secured and a subsequent LDL on 6/23/23 found holes in the tubing at 7930’
and 11120’ MD with a LLR of 0.5 bpm at 2500 psi. On 5/14/25 the well passed a CMIT-
TxIA to 2834 psi verifying a competent secondary well barrier. Hilcorp would like to
request permission to place NK-15A on production for up to 45 days to evaluate
economics in support of a rig workover to replace the tubing. Gas lift will not be needed
for this operation. IAP will be maintained below MOASP of 2500 psi and the well will be
secured at the end of the evaluation period.
Regards,
Oliver Sternicki
Hilcorp Alaska, Hilcorp North Slope LLC
Well Integrity Supervisor
Office: (907) 564 4891
Cell: (907) 350 0759
Oliver.Sternicki@hilcorp.com
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
7. If perforating:
1. Type of Request:
2. Operator Name:
3. Address:
4. Current Well Class:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Property Designation (Lease Number):10. Field:
Abandon
Suspend
Plug for Redrill Perforate New Pool
Perforate
Plug Perforations
Re-enter Susp Well
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well
Other:
Change Approved Program
Operations shutdown
What Regulation or Conservation Order governs well spacing in thes pool?
Will perfs require a spacing exception due to property boundaries?Yes No
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
PRESENT WELL CONDITION SUMMARY
Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft):
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
12. Attachments:
14. Estimated Date for
Commencing Operations:
13. Well Class after proposed work:
15. Well Status after proposed work:
16. Verbal Approval:
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal.
Proposal Summary Wellbore schematic
BOP SketchDetailed Operations Program
OIL
GAS
WINJ
WAG
GINJ
WDSPL
GSTOR
Op Shutdown
Suspended
SPLUG
Abandoned
ServiceDevelopmentStratigraphicExploratory
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
AOGCC USE ONLY
Commission Representative:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Location ClearanceMechanical Integrity TestBOP TestPlug Integrity
Other Conditions of Approval:
Post Initial Injection MIT Req'd?Yes No
Subsequent Form Required:
Approved By:Date:
APPROVED BY
THE AOGCCCOMMISSIONER
PBU NK-15A
Tbg swap
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK
99503
216-175
50-029-22745-01-00
0034635 , 0034630
16752
Conductor
Surface
Intermediate
Liner
Liner
9800
80
7324
7442
6853
2785
13944
20"
13-3/8"
9-5/8"
7"
4-1/2"
9460
49 - 129
48 - 7372
45 - 7487
7285 - 14138
13965 - 16750
3267
49 - 129
48 - 5075
45 - 5107
5051 - 9617
9477 - 9801
none
520
2260
4760
5410
7500
13944 , 14670
1530
5020
6870
7240
8430
14164 - 16700 4/12" 12.6# L-80 44 - 139659638 - 9814
Structural
4-1/2" HES TNT Perm
No SSSV
13834
9372
Date:
Bo York
Operations Manager
Eric Dickerman
Eric.Dickerman@hilcorp.com
907.564.4061
PRUDHOE BAY
8-1-2023
Current Pools:
RAVEN OIL
Proposed Pools:
RAVEN OIL
Suspension Expiration Date:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov
By Grace Christianson at 8:17 am, Jul 14, 2023
323-397
Digitally signed by Bo York (1248)
DN: cn=Bo York (1248)
Date: 2023.07.14 07:16:52 -08'00'
DSR-7/19/23
3267
MDG 7/21/2023
10-404
BOPE pressure test to 3500 psi. Annular to 2500 psi.
MGR14JUL23GCW 07/24/2023JLC 7/24/2023
Brett W.
Huber, Sr.
Digitally signed by
Brett W. Huber, Sr.
Date: 2023.07.24
19:06:17 -06'00'07/24/23
RBDMS JSB 072523
NK-15A : Tbg Swap
PTD: 216-175
Page 1 of 7
Well Name:NK-15A API Number:50-029-22745-01-00
Current Status:Not Operable, Shut in Permit to Drill Number:216175
Estimated Start Date:August 2023 Rig:Thunderbird
Regulatory Contact:Carrie Janowski Estimated Duration:6 days
First Call Engineer:Eric Dickerman Cell Number:307-250-4013
Second Call Engineer:Dave Bjork Cell Number:907-440-0331
Brief Well Summary:
NK-15A was drilled as an injector in the Raven block at Niakuk. The well was converted from an injector
to a producer in 1Q 2021 and has been a full time producer since that time. In June 2023, the well was
made Not Operable after a leak detection log found holes in the tubing at 7,930’ and 11,120’. A caliper
was logged on June 24, 2023 and found the tubing in poor condition due to corrosion.
x The well is currently secured with a plug in the tubing tail, and the well passed a CMIT-TxIA on
6/22/2023 indicating the tubing tail plug and production casing have integrity.
Objective:
Replace tubing. Return well to production.
Current Bottom Hole Pressure:4,252psi at 9,850’TVDss | from NK-38B SBHP in same fault block
8.31 ppg EMW
Max. Anticipated Surface Pressure:3,267psi (0.1psi/ft gas gradient to surface)
Last Shut-in WHP:1,850psi (WSR 6/19/2023)
Min. ID:3.725” XN Nipple at 13,944’md
Max. Deviation:65.5 degrees at 12,125’md
H2S Concentration:0 PPM (4/13/2023)
Well Integrity Information:
Tbg: MIT-T failed, 0.5bpm at 2,500psi.
IA: CMIT-TxIA passed 2,250psi, 6/22/2023.
OA: MIT-OA passed 1,115psi, 1/29/2018.
PPPOT-T: PPPOT-T passed 5,000psi, 6/16/2023.
PPPOT-IC: PPPOT-IC passed 3,500psi, 1/17/2018.
3,267psi (
NK-15A : Tbg Swap
PTD: 216-175
Page 2 of 7
Wellwork Procedure:
Wellhead:
1. PPPOT-IC. Function all LDS.
Eline/Fullbore:
2. Cut tubing at ~13,754’.
3. Circulate the well to 9.8ppg KWF + freeze protect.
DHD:
4. Bleed WHPs to 0 psi.
Valve Shop:
5. Set and test TWC.
6. ND production tree and THA. Inspect landing threads.
7. NU BOPs for over 3K MASP, top down: Annular, 2-7/8”x 5” VBRs, blinds and integral flow cross,
2-7/8”x 5” VBRs.
RWO:
8. MIRU Thunderbird #1 Rig.
9. Test BOPE to 250psi Low/3,500psi High, annular to 250psi Low/3,000psi High (hold each
ram/valve and test for 5-min).
A. Record accumulator pre-charge pressures and chart tests.
B. Notify AOGCC 24 hrs in advance of BOP test.
C. Confirm test pressures per the Sundry Conditions of approval.
D. Test the 2-7/8” x 5” VBRs and annular with a 4-1/2” test joint.
E. If a workstring run is required during the operation, stop and test VBR’s and annular with a
2-7/8” test joint.
F. Submit to AOGCC a completed 10-424 form within 5 days of BOPE test.
10. Pull TWC. RU a lubricator if pressure is suspected below the TWC.
11. MU landing joint or spear, BOLDS and pull hanger to the floor. Circulate bottoms up. PU weights
are expected to be ~148k# in 9.8ppg brine.
12. Lay down 4-1/2”, L-80, VamTop tubing.
13. Run 4-1/2”, 13Cr, VamTop gas lifted completion.
a. Due to Niakuk’s proximity to a navigable waterway, the completion will include a tubing
retrievable surface controlled subsurface safety valve with hydraulic control line set at
~2,000’md.
i. Permafrost depth estimated at 1,900’md from offset well log picks.
ii. A set depth of 2,000’md is within the engineered fail safe setting depth of the
TRSV.
iii. TRSV is planned to be the same manufacturer and model installed in the most
recent drill wells at Niakuk: NK-08B (set at 2,053’md), NK-14B (set at 2,013’md),
and NK-26A (set at 2,007’ md).
14. Land hanger.
15. Set TWC.
16. RDMO Thunderbird #1.
NK-15A : Tbg Swap
PTD: 216-175
Page 3 of 7
Valve Shop/Fullbore:
17. ND BOPE.
18. NU THA and production tree. Test tree and tubing hanger void to 500psi low/5,000psi high.
19. Pull TWC.
20. Circulate the well to inhibited 8.5ppg seawater.
21. Drop ball and rod and set packer.
22. Perform MIT-T to 3,000psi and MIT-IA to 3,000psi for 30 charted minutes.
23. Shear valve in top GLM.
24. Freeze protect well with diesel to 2,500’tvd.
Slickline:
25. Pull ball and rod.
26. Set kick off gas lift design.
27. Pull plug from 13,944’md.
28. Hand well over to DSO to POP.
29. Obtain AOGCC witnessed SVS test within 5 days of putting well online.
NK-15A : Tbg Swap
PTD: 216-175
Page 4 of 7
Current Wellbore Schematic:
NK-15A : Tbg Swap
PTD: 216-175
Page 5 of 7
Proposed Schematic:
NK-15A : Tbg Swap
PTD: 216-175
Page 6 of 7
BOP Schematic:
NK-15A : Tbg Swap
PTD: 216-175
Page 7 of 7
Changes to Approved Sundry Procedure
Date:
Subject:
Sundry #:
Any modifications to an approved sundry will be documented and approved below. Changes to an
approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written
approval of the change is required before implementing the change.
Step Page Date Procedure Change
HAK
Prepared
By
(Initials)
HAK
Approve
d
By
(Initials)
AOGCC Written
Approval
Received
(Person and
Date)
Approval:
Operations Manager Date
Prepared:
Operations Engineer Date
Operator Name:2.
Development Exploratory
Service
5
Permit to Drill Number:216-175
6.50-029-22745-01-00
PRUDHOE BAY, RAVEN OIL
Hilcorp North Slope, LLC 5.
Well Name and Number:8.
10.Field/Pools:
Well Class Before Work4.
Present Well Condition Summary:11.
Total Depth: measured feet
feet
Plugs measured feet
feet
Effective Depth: measured feet
feet
Packer measured feet
feettrue vertical true vertical
16752
14670
9991
13834
none
none
9372
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20" 49 - 129 49 - 129 1530 520
Surface 7324 13-3/8" 48 - 7372 48 - 5075 5020 / 5380 2260 / 2670
Intermediate 7442 9-5/8" 45 - 7487 45 - 5107 6870 4760
Liner 6853 7" 7285 - 14138 5051 - 9617 7240 5410
Perforation Depth: Measured depth: 14164 - 16700
feet
True vertical depth:9638 - 9814 feet
Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 44 - 13965 44 - 9478
13834 9372Packers and SSSV (type, measured and
true vertical depth)
4-1/2" HES TNT Perm Packer
Liner 2785 4-1/2" 13965 - 16750 9477 - 9801 8430 7500
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
0000
4219912 1327
0
1309 967
Representative Daily Average Production or Injection Data
Prior to well operation:
Subsequent to operation:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name:
Contact Email:
Kirsty Schultz
Kirsten.Schultz@hilcorp.com
Authorized Name:Bo York
Authorized Title:
Authorized Signature with Date:Contact Phone:(907) 564-5258
Treatment descriptions including volumes used and final pressure:
13.
Operations Manager
Operations Performed1.
Abandon Plug Perforations Fracture Stimulate Pull Tubing
GSTOR WINJ WAG GINJ SUSP SPLUG
16. Well Status after work:Oil 5 Gas
Exploratory Development 5 Stratigraphic
15. Well Class after work:
Service
WDSPL
14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283)
Daily Report of Well Operations
Copies of Logs and Surveys Run
true vertical measured9800
Sundry Number or N/A if C.O. Exempt:
320-543
K-valve 1994 1993
Junk
Packer
Printed and Electronic Fracture Stimulation Data
5
Operations shutdown
Change Approved Program
5
Senior Pet Engineer:Senior Res. Engineer:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Suspend Perforate Other Stimulate Alter Casing
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well
3.Address: 3800 Centerpoint Dr, Suite
1400, Anchorage, AK 99503
7.Property Designation (Lease Number):ADL 034635 & 034630 RAVN NK-15A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
Stratigraphic
Other:
API Number:
Form 10-404 Revised 03/2020 Submit Within 30 days of Operations
convert to producer, install
new K-valve design
By Samantha Carlisle at 9:43 am, Jan 29, 2021
Digitally signed by Bo York
DN: cn=Bo York, c=US, o=HIlcorp
Alaska LLC, ou=Alaska North
Slope, email=byork@hilcorp.com
Date: 2021.01.28 15:39:25 -09'00'
Bo York
RBDMS HEW 1/29/2021
SFD 2/1/2021DSR-2/1/21MGR19FEB2021
ACTIVITYDATE SUMMARY
1/15/2021
***WELL S/I ON ARRIVAL*** (SSSV MAINTENANCE)
MISU POLLARD #57 TO SET HES K-VALVE AT 1,994' MD.
***LDFN, WELL S/I & SECURED, CONTINUE ON 1/16/21 WSR***
1/16/2021
***CONTINUED FROM 1/15/21 WSR*** (SSSV MAINTENANCE)
SET 4-1/2" HES K-VALVE (722 Dome psi @ 60* - s/n = K5OA) AT 1,952' SLM /
1,994' MD.
RAN 4-1/2" CHECK SET TO X-LOCK AT 1,952' SLM (Tool sheared indicating good
set).
***WELL S/I ON DEPARTURE, NOTIFIED DSO OF WELL STATUS***
Daily Report of Well Operations
PBU NK-15A
Operator Name:2.
Development Exploratory
Service
5
Permit to Drill Number:216-175
6.50-029-22745-01-00
PRUDHOE BAY, RAVEN OIL
Hilcorp North Slope, LLC 5.
Well Name and Number:8.
10.Field/Pools:
Well Class Before Work4.
Present Well Condition Summary:11.
Total Depth: measured feet
feet
Plugs measured feet
feet
Effective Depth: measured feet
feet
Packer measured feet
feettrue vertical true vertical
16752
14670
9991
13834
none
none
9372
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20" 49 - 129 49 - 129 1530 520
Surface 7324 13-3/8" 48 - 7372 48 - 5075 5020 / 5380 2260 / 2670
Intermediate 7442 9-5/8" 45 - 7487 45 - 5107 6870 4760
Liner 6853 7" 7285 - 14138 5051 - 9617 7240 5410
Perforation Depth: Measured depth: 14164 - 16700
feet
True vertical depth:9638 - 9814 feet
Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 44 - 13965 44 - 9478
13834 9372Packers and SSSV (type, measured and
true vertical depth)
4-1/2" HES TNT Perm Packer
Liner 2785 4-1/2" 13965 - 16750 9477 - 9801 8430 7500
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
73916812737118
223100 0
1727
1560 1000
Representative Daily Average Production or Injection Data
Prior to well operation:
Subsequent to operation:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name:
Contact Email:
Kirsty Schultz
Kirsten.Schultz@hilcorp.com
Authorized Name:Bo York
Authorized Title:
Authorized Signature with Date:Contact Phone:(907) 564-5258
Treatment descriptions including volumes used and final pressure:
13.
Operations Manager
Operations Performed1.
Abandon Plug Perforations Fracture Stimulate Pull Tubing
GSTOR WINJ WAG GINJ SUSP SPLUG
16. Well Status after work:Oil 5 Gas
Exploratory Development 5 Stratigraphic
15. Well Class after work:
Service
WDSPL
14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283)
Daily Report of Well Operations
Copies of Logs and Surveys Run
true vertical measured9800
Sundry Number or N/A if C.O. Exempt:
320-381
no SSSV
Junk
Packer
Printed and Electronic Fracture Stimulation Data
5
Set CIBP
Operations shutdown
Change Approved Program
5
Senior Pet Engineer:Senior Res. Engineer:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Suspend 5Perforate Other Stimulate Alter Casing
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well
3.Address: 3800 Centerpoint Dr, Suite
1400, Anchorage, AK 99503
7.Property Designation (Lease Number):ADL 034635 & 034630 RAVN NK-15A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
Stratigraphic
Other:
API Number:
Form 10-404 Revised 03/2020 Submit Within 30 days of Operations
By Samantha Carlisle at 3:44 pm, Jan 05, 2021
Digitally signed by Bo York
DN: cn=Bo York, c=US, o=HIlcorp
Alaska LLC, ou=Alaska North
Slope, email=byork@hilcorp.com
Date: 2021.01.05 12:51:54 -09'00'
Bo York
Convert to producer HEW
MGR17FEB2021 DSR-1/6/21 RBDMS HEW 1/13/2021
SFD 1/13/2021
ACTIVITYDATE SUMMARY
11/8/2020
T/I/O=1750/690/0 Assist Slickline (Load tbg) Pump 2 bbls 60/40, 250 bbls 1% slick
kcl, 33 bbls crude. Slickline unable to POOH into lubricator. Pump 10 bbls 60/40 & 18
bbls 180* crude down tbg to thaw lubricator. Load lubricator with 1.25 bbls neat meth
FWHPs=1500/700/0
11/8/2020
***WELL S/I ON ARRIVAL***(perforating).
DRIFT W/ 3.625" CENT, 3' 1-7/8", 3.70" CENT TO DEVIATION @ 14,680' SLM.
DRIFT W/ 30' X 2-7/8" DMY GUNS TO 9,025' SLM (unable to pass).
LRS PUMPED 240 BBLS SAFE LUBE, 40 BBLS CRUDE DOWN TBG.
***JOB CONTINUED ON 11/9/20 WSR***
11/8/2020
***WELL S/I ON ARRIVAL***(perforating).
DRIFT W/ 3.625" CENT, 3' 1-7/8", 3.70" CENT TO DEVIATION @ 14,680' SLM.
DRIFT W/ 30' X 2-7/8" DMY GUNS TO 9,025' SLM (unable to pass).
LRS PUMPED 240 BBLS SAFE LUBE, 40 BBLS CRUDE DOWN TBG.
***JOB CONTINUED ON 11/9/20 WSR***
11/9/2020
***JOB CONTINUED FROM 11/8/20 WSR***(perforating).
RAN 20' x 2-7/8" DMY GUNS TO 14,500' SLM (no issues, used roller stem).
***JOB COMPLETE, WELL LEFT S/I ON DEPARTURE***
11/9/2020
***JOB CONTINUED FROM 11/8/20 WSR***(perforating).
RAN 20' x 2-7/8" DMY GUNS TO 14,500' SLM (no issues, used roller stem).
***JOB COMPLETE, WELL LEFT S/I ON DEPARTURE***
11/11/2020
***WELL S/I ON ARRIVAL*** (HES E-Line PLUG & PERFORATE)
SET 4-1/2" NORTHERN SOLUTIONS CIBP AT 14,670' MD MID-ELEMENT.
***JOB CONTINUED ON 12-NOV-20202***
11/12/2020
***JOB CONTINUED FROM 11-NOV-2020*** (HES E-Line Plug & Perforate)
PERFORATE 14,221' - 14,241' W/ 2 7/8" MAXFORCE, 6 SPF, 60 DEG PHASE
GUN.
PERFORATE 14,201' - 14,221' W/ 2-7/8" MAXFORCE, 6 SPF, 60 DEG PHASE
GUN.
***JOB CONTINUED ON 13-NOV-2020***
11/13/2020
***JOB CONTINUED FROM 12-NOV-2020*** (HES E-Line Plug & Perforate)
PERFORATE 14181' - 14201' W/ 2 7/8" MAXFORCE, 6 SPF, 60 DEG PHASE GUN.
PERFORATE 14164' - 14181' W/ 2 7/8" MAXFORCE, 6 SPF, 60 DEG PHASE GUN.
***JOB COMPLETE, WELL S/I AND SECURED ON DEPARTURE, DSO
NOTIFIED***
11/18/2020
LRS Test Unit #6 ,High H2S Injector Flowback, IL Well NK-15 , OL Well NK-38
***Begin WSR 11/18/20*** MIRU , PT , POP/Flow/Stabilize ***Job in
Progress***Continue on WSR 11/19/20***
11/19/2020
LRS Test Unit #6 ,High H2S Injector Flowback, IL Well NK-15 , OL Well NK-38
***Continue from WSR 11/18/20*** Continue Flow / Open Choke, 8 Hour Test ***Job
in Progress***Continue on WSR 11/20/20***
11/20/2020
LRS Test Unit #6 ,High H2S Injector Flowback, IL Well NK-15 , OL Well NK-38
***Continue from WSR 11/19/20*** Continue Flow, completed 8 hr test, started 8
Hour Piggy Back Test, ***Job in Progress***Continue on WSR 11/21/20***
11/21/2020
LRS Test Unit #6 ,High H2S Injector Flowback, IL Well NK-15 , OL Well NK-38
***Continue from WSR 11/20/20*** Continue Flow, 8 hr Well Test ***Job in
Progress***Continue on WSR 11/22/20***
11/21/2020
LRS Test Unit #6 ,High H2S Injector Flowback, IL Well NK-15 , OL Well NK-38
***Continue from WSR 11/20/20*** Continue Flow, 8 hr Well Test ***Job in
Progress***Continue on WSR 11/22/20***
Daily Report of Well Operations
PBU NK-15A
Daily Report of Well Operations
PBU NK-15A
11/22/2020
LRS Test Unit #6 ,High H2S Injector Flowback, IL Well NK-15 , OL Well NK-38
***Continue from WSR 11/21/20*** Continue Flow, 8 hr Well Test ***Job in
Progress***Continue on WSR 11/23/20***
11/23/2020
LRS Test Unit #6 ,High H2S Injector Flowback, IL Well NK-15 , OL Well NK-38
***Continue from WSR 11/22/20*** Continue Flow, 8 hr Well Test,RDMO ***Job
Complete***End WSR 11/23/20***
12/13/2020
LRS Well Test Unit 6. Well Test/ Rate Verification. Begin WSR 12/13/20, Perform
Unit Move, Begin Rig Up. Inlet Well NK-15, Outlet Well NK-38. Job in Progress,
Continued on WSR 12/14/20
12/14/2020
LRS Well Test Unit 6. Well Test/ Rate Verification. Continue from WSR 12/13/20.
Complete Rig Up, PT, Standby, Inlet Well NK-15, Outlet Well NK-38. Job in Progress,
Continued on WSR 12/15/20
12/15/2020
LRS Well Test Unit 6. Well Test/ Rate Verification. Continue from WSR 12/14/20.
POP / Stabilize Well, Bypass IL Choke. Inlet Well NK-15, Outlet Well NK-38. Job in
Progress, Continued on WSR 12/16/20
12/16/2020
LRS Well Test Unit 6. Well Test/ Rate Verification. Continue from WSR 12/15/20.
Continue flowback. Inlet Well NK-15, Outlet Well NK-38. Job in Progress, Continued
on WSR 12/17/20
12/17/2020
LRS Well Test Unit 6. Well Test/ Rate Verification. Continue from WSR 12/16/20.
Continue flowback. DSO diverted NK-15 into WPS and began purge. Inlet Well NK-
15, Outlet Well NK-38. Job in Progress, Continued on WSR 12/18/20
12/18/2020
LRS Well Test Unit 6. Well Test/ Rate Verification. Continue from WSR 12/16/20.
Continue flowback. Begin 8 hr Piggyback well test. Inlet Well NK-15, Outlet Well NK-
38. Job in Progress, Continued on WSR 12/18/20
12/19/2020
LRS Well Test Unit 6. Well Test/ Rate Verification. Continue from WSR 12/18/20.
Continue flowback. Begin 8 hr well test. Inlet Well NK-15, Outlet Well NK-38. Job in
Progress, Continued on WSR 12/20/20
12/20/2020
LRS Well Test Unit 6. Well Test/ Rate Verification. Continue from WSR 12/19/20.
Continue flowback. perform 8 hr well test. Inlet Well NK-15, Outlet Well NK-38. Job in
Progress, Continued on WSR 12/21/20
12/21/2020
LRS Well Test Unit 6. Well Test/ Rate Verification. Continue from WSR 12/20/20.
Continue flowback. perform 8 hr well test. Inlet Well NK-15, Outlet Well NK-38. Job in
Progress, Continued on WSR 12/22/20
12/22/2020
LRS Well Test Unit 6. Well Test/ Rate Verification. Continue from WSR 12/21/20.
Continue flowback. perform 8 hr well test. Inlet Well NK-15, Outlet Well NK-38. Job in
Progress, Continued on WSR 12/23/20
12/23/2020
LRS Well Test Unit 6. Well Test/ Rate Verification. Continue from WSR 12/22/20. BD,
RDMO, SB for Scheduling. Inlet Well NK-15, Outlet Well NK-38, End WSR/ Job
Complete
2SHUDWRU1DPH
([SORUDWRU\'HYHORSPHQW
6HUYLFH
5
3HUPLWWR'ULOO1XPEHU
$3,1XPEHU
358'+2(%$<5$9(12,/358'+2(%$<1,$.8.2,/
+LOFRUS1RUWK6ORSH//&
)LHOG3RROV
:HOO1DPHDQG1XPEHU
$'/
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU
QD ,ISHUIRUDWLQJ
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ"
6WUDWLJUDSKLF
&XUUHQW:HOO&ODVV
7\SHRI5HTXHVW$EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:HOO
2SHUDWLRQVVKXWGRZQ
2S6KXWGRZQ
*$6
*6725 :$*
63/8*
$EDQGRQHG
2LO 5 :,1-
([SORUDWRU\ 'HYHORSPHQW 56WUDWLJUDSKLF 6HUYLFH
:'63/
$WWDFKPHQWV
35(6(17:(//&21',7,216800$5<
(IIHFWLYH'HSWK0'
/
&RPPLVVLRQ5HSUHVHQWDWLYH
6XVSHQGHG
&RQWDFW1DPH .LUVW\6FKXOW]
&RQWDFW(PDLO .LUVWHQ6KXOW]#KLOFRUSFRP
$XWKRUL]HG1DPH %R<RUN
$XWKRUL]HG7LWOH2SHUDWLRQV0DQDJHU
$XWKRUL]HG6LJQDWXUH
3OXJ,QWHJULW\ %237HVW 0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
2WKHU
<HV 1R 6SDFLQJ([FHSWLRQ5HTXLUHG"6XEVHTXHQW)RUP5HTXLUHG
$SSURYHGE\&200,66,21(5
$33529('%<7+(
&200,66,21 'DWH
52WKHU$OWHU&DVLQJ
3XOO7XELQJ
&RQGLWLRQVRIDSSURYDO1RWLI\&RPPLVVLRQVRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
&200,66,2186(21/<
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRW
EHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
'HWDLOHG2SHUDWLRQV3URJUDP
3DFNHUVDQG66697\SH
1R6669,QVWDOOHG
3DFNHUVDQG66690'IWDQG79'IW
3HUIRUDWLRQ'HSWK0'IW7XELQJ6L]H
6L]H
7RWDO'HSWK0'IW7RWDO'HSWK79'IW
(IIHFWLYH'HSWK79'3OXJV0'-XQN0'
2WKHU6WLPXODWH
5HHQWHU6XVS:HOO
6XVSHQG
3OXJIRU5HGULOO
3HUIRUDWH
3HUIRUDWH1HZ3RRO
1R6669,QVWDOOHG
'DWH
/LQHU
:HOO6WDWXVDIWHUSURSRVHGZRUN
9HUEDO$SSURYDO
&KDQJH$SSURYHG3URJUDP
(VWLPDWHG'DWHIRU&RPPHQFLQJ2SHUDWLRQV
%236NHWFK
6WUXFWXUDO
3URSRVDO6XPPDU\:HOO&ODVVDIWHUSURSRVHGZRUN
+(67173HUP3DFNHU
/LQHU
QRQH
&RQWDFW3KRQH
'DWH
&RQGXFWRU
*,1-
5
3RVW,QLWLDO,QMHFWLRQ0,75HT
G" <HV 1R
5
&RPP
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
6XUIDFH
,QWHUPHGLDWH
$GGUHVV&HQWHUSRLQW'U6XLWH
$QFKRUDJH$.
1R 5<HV
&DVLQJ /HQJWK 0'79' %XUVW
7XELQJ*UDGH7XELQJ0'IW3HUIRUDWLRQ'HSWK79'IW
&ROODSVH
0363SVL
:HOOERUH6FKHPDWLF
&RPP6U3HW(QJ 6U3HW*HR 6U5HV(QJ
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO
&RQYHUWWR3URGXFHU
,QVWDOOQHZ6669GHVLJQ
3%81.$
By Jody Colombie at 3:43 pm, Dec 28, 2020
'LJLWDOO\VLJQHGE\%R<RUN
'1FQ %R<RUNF 86R +,OFRUS
$ODVND//&RX $ODVND1RUWK
6ORSHHPDLO E\RUN#KLOFRUSFRP
'DWH
%R<RUN
6)'
'656)'
0*5'(&
<HVSWLRQ5HTXLUHG"
&RPP
12/29/2020
dts 12/29/2020
RBDMS HEW 1/26/2021
^^^s/ŶƐƚĂůůĂƚŝŽŶ
tĞůů͗E<Ͳϭϱ
ĂƚĞ͗ϭϮͬϮϳͬϮϬ
tĞůůEĂŵĞ͗E<ͲϭϱW/EƵŵďĞƌ͗ϱϬͲϬϮϵͲϮϮϳϰϱͲϬϭ
ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^ŚƵƚŝŶ Ͳ ŽƉĞƌĂďůĞ WĂĚ͗E<
ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗ϭͬϭϬͬϮϬϮϬ ZŝŐ͗
ZĞŐ͘ƉƉƌŽǀĂů ZĞƋ͛Ě͍ϭϬͲϰϬϯΘϭϬͲϰϬϰ ĂƚĞ ZĞŐ͘ƉƉƌŽǀĂů ZĞĐ͛ǀĚ͗
&ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗<ŝƌƐƚLJ^ĐŚƵůƚnj WŚŽŶĞEƵŵďĞƌ͗;ϵϬϳͿϯϱϬͲϰϯϭϬ
&EƵŵďĞƌ͗ :ŽďdLJƉĞ͗^^^sŝŶƐƚĂůůĂƚŝŽŶ
ƐƚŝŵĂƚĞĚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ͗ ϰϲϴϴƉƐŝΛϵ͕ϴϱϬdsƐƐ
DW^W͗ϯϳϬϯƉƐŝ
DĂdžĞǀ͗ϭϬϱĚĞŐΛϭϲϮϰϵ͛D
DŝŶ/͗ϯ͘ϳϮϱ͟Λϭϯϵϰϰ͛D
ƌŝĞĨtĞůů^ƵŵŵĂƌLJ͗
E<ͲϭϱŝƐĂŶŽďƐŽůĞƚĞŝŶũĞĐƚŽƌǁĞĂƌĞĐŽŶǀĞƌƚŝŶŐƚŽĂĨƵůůƚŝŵĞƉƌŽĚƵĐĞƌ͘dŚĞǁĞůůƌĞĐĞŶƚůLJŚĂĚĂ/WƐĞƚĂŶĚ
ƉĞƌĨŽƌĂƚŝŽŶƐƐŚŽƚŝŶƚŚĞ^ĂŐ͘dŚĞǁĞůůǁĂƐĨůŽǁĞĚďĂĐŬƚŚƌŽƵŐŚĂƉŽƌƚĂďůĞƚĞƐƚƐĞƉĂƌĂƚŽƌĨŽƌϭϰĚĂLJƐƚŽƉƌŽǀĞ
ĐŽŵƉĞƚŝƚŝǀĞŶĞƐƐĂƚƚŚĞĨĂĐŝůŝƚLJ͘E<ͲϭϱĐĂŵĞŽŶůŝŶĞŚŝŐŚůLJĐŽŵƉĞƚŝƚŝǀĞĂƚƚŚĞƉůĂŶƚ͕ƐŽƚŚĞǁĞůůǁŝůůďĞƚŝĞĚŝŶĂƐ
ĂĨƵůůƚŝŵĞƉƌŽĚƵĐĞƌ͘E<ͲϭϱǁŝůůƵƚŝůŝnjĞƚŚĞĂĚũĂĐĞŶƚĨůŽǁůŝŶĞŽĨ>d^/ƉƌŽĚƵĐĞƌE<ͲϲϮ͘dŚĞǁĞůůĂůƐŽƌĞƋƵŝƌĞƐĂ
ƐƵďƐƵƌĨĂĐĞĐŽŶƚƌŽůůĞĚƐƵďƐƵƌĨĂĐĞƐĂĨĞƚLJǀĂůǀĞƚŽďĞŝŶƐƚĂůůĞĚďĞĨŽƌĞďĞŝŶŐƉƵƚŽŶůŝŶĞĨƵůůƚŝŵĞ͘
KďũĞĐƚŝǀĞ͗
^Ğƚ^^^sŝŶdžͲŶŝƉƉůĞĂƚϭϵϵϰ͛D͘
^ůŝĐŬůŝŶĞWƌŽĐĞĚƵƌĞ͗
ϭ͘ D/Zh^ůŝĐŬůŝŶĞ
Ϯ͘ Z/,ĂŶĚƐĞƚƐƵďƐƵƌĨĂĐĞĐŽŶƚƌŽůůĞĚƐƵďƐƵƌĨĂĐĞƐĂĨĞƚLJǀĂůǀĞŝŶdžͲŶŝƉƉůĞĂƚϭϵϵϮ͛D͘
ϯ͘ dƵƌŶǁĞůůŽǀĞƌƚŽŽƉĞƌĂƚŝŽŶƐĨŽƌĨƵůůƚŝŵĞƉƌŽĚƵĐƚŝŽŶ;ŝĨƉĞƌŵĂŶĞŶƚtd/ŝƐĐŽŵƉůĞƚĞͿ͘
ϰ͘ K'ǁŝƚŶĞƐƐĞĚƐĂĨĞƚLJǀĂůǀĞƚĞƐƚǁŝƚŚŝŶϱĚĂLJƐŽĨE<ͲϭϱďĞŝŶŐďƌŽƵŐŚƚŽŶůŝŶĞ͘
KRXUQRWLFHWR$2*&&WRZLWQHVVVDIHW\YDOYHV\VWHPSHUIRUPDQFHWHVW
^^^s/ŶƐƚĂůůĂƚŝŽŶ
tĞůů͗E<Ͳϭϱ
ĂƚĞ͗ϭϮͬϮϳͬϮϬ
'DWH
7HVW'DWD
7HVW'DWH
*URVV)OXLG5DWH %/3'
)ORZLQJ:HOO+HDG3UHVVXUH SVL
)ORZLQJ:HOO+HDG7HPSHUDWXUH GHJ)
*25 VFIEEO
7*/5 ( VFIEEO
)ORZLQJ3UHVVXUH&DOFXODWLRQV%DVHGRQ0XNKHUMHHDQG%ULOO0XOWLSKDVH)ORZ&RUUHODWLRQ
.9DOYH6HWWLQJ'HSWK79' IW
)ORZLQJ7XELQJ3UHVVXUH:LWK*DV/LIW 1$ SVL
)ORZLQJ7XELQJ3UHVVXUH:LWKRXW*DV/LIW SVL
9DOYHVHWWRFORVHDW3ZK
)ORZLQJ7XELQJ3UHVVXUH#QLSSOH#3ZKSVL SVL
.9DOYH7HVW5DFN6HW3UHVVXUHDWGHJ) SVL
127(:HOOQHHGVWRIORZDW!3ZK
9DOYHVHWWRFORVHDWOHVVWKDQ3ZKRISVL
.9DOYH&DOFXODWLRQ6KHHW
:HOO1.$
9DOYH6L]H 9ROXPH5DWLR
^^^s/ŶƐƚĂůůĂƚŝŽŶ
tĞůů͗E<Ͳϭϱ
ĂƚĞ͗ϭϮͬϮϳͬϮϬ
tĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ͗
Samuel Gebert Hilcorp Alaska, LLC
GeoTechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: 907 777-8337
Fax: 907 777-8510
E-mail: sam.gebert@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510
Received By: Date:
DATE: 12/01/2020
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL
NK-15A (PTD 216-175)
PLUG SETTING AND PERFORATING RECORD 11/13/2020
Please include current contact information if different from above.
Received by the AOGCC 12/04/2020
PTD: 2161750
E-Set: 34318
Abby Bell 12/04/2020
Operator Name:2.
Exploratory Development
Service
5
Permit to Drill Number:216-175
6.API Number:50-029-22745-01-00
PRUDHOE BAY, RAVEN OIL / PRUDHOE BAY, NIAKUK OIL
Hilcorp North Slope, LLC 5.
Field/Pools:9.
Well Name and Number:
ADL 034635 & 034630
Property Designation (Lease Number):10.
CO 329 B/C 8.
RAVN NK-15A
7.If perforating:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception?
Stratigraphic
Current Well Class:4.
Type of Request:1.Abandon Plug Perforations Fracture Stimulate Repair Well
Operations shutdown
convert to producer
Op Shutdown
GAS
GSTOR WAG
SPLUG
Abandoned
Oil 5 WINJ
Exploratory Development 5Stratigraphic Service
WDSPL
12. Attachments:
PRESENT WELL CONDITION SUMMARY
16752
Effective Depth MD:
L-80
11.
10/1/2020
Commission Representative:
15.
Suspended
Contact Name: Kirsty Schultz
Contact Email: Kirsten.Schultz.hilcorp.com
Authorized Name:
Authorized Title:
Authorized Signature:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other:
Yes No Spacing Exception Required?Subsequent Form Required:
Approved by:COMMISSIONER
APPROVED BYTHE
COMMISSION Date:
5OtherAlter Casing
Pull Tubing
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
COMMISSION USE ONLY
17. I hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Detailed Operations Program
Packers and SSSV Type:
No SSSV Installed
Packers and SSSV MD (ft) and TVD (ft):
Perforation Depth MD (ft):Tubing Size:
Size
Total Depth MD (ft):Total Depth TVD(ft):
9800
Effective Depth TVD:Plugs (MD):Junk (MD):
Other Stimulate
Re-enter Susp Well
Suspend
Plug for Redrill
5Perforate
Perforate New Pool
13834, 9372
No SSSV Installed
Date:
Liner 2785 4-1/2" 13965 - 16750 9477 - 9801 8430 7500
Well Status after proposed work:
16. Verbal Approval:
Change Approved Program
48 - 7372 48 - 5075
14. Estimated Date for Commencing Operations:
BOP Sketch
49 - 129
Structural
6870
Proposal Summary 13. Well Class after proposed work:
4-1/2" HES TNT Perm Packer
16060 - 16700 9968 - 9814 4-1/2" 12.6# L-80 44 - 13965
Liner
16702 9813 None None
49 - 129 520
13-3/8"
9-5/8"
Contact Phone:(907)564 - 5258
Date: 9-16-20
4760
80 153020"Conductor
2260 / 2670
GINJ
5
Post Initial Injection MIT Req'd? Yes No
5
Comm.
APPLICATION FOR SUNDRY APPROVALS20 AAC 25.280
Surface 7324 5020 / 5380
Intermediate 7442 45 - 7487 45 - 5107
6853 7" 7285 - 14138 5051 - 9617 7240 5410
Address:3800 Centerpoint Dr, Suite 1400,
Anchorage, AK 99503
3.
No 5Yes
Casing Length MD TVD Burst
Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft):
Collapse
MPSP (psi):
Wellbore Schematic
Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Torin Roschinger
Sr. Operations Engineer
320-381
Digitally signed by Torin Roschinger (4662)
DN: cn=Torin Roschinger (4662), ou=Users
Date: 2020.09.17 14:39:44 -08'00'Torin Roschinger (4662)
X
X
24 hour observer during temporary piping flow back test without SSSV.
Increase well monitoring (minimum of 4 times per day) during flow back after permanent piping is in place.
X
flow test
DLB 09/18/2020 DSR-9/18/2020
DLB
3700
10-404
MGR02OCT20
Performance test of safety valves. 24 hour notice.
Yption Required?
Comm
10/5/2020
dts 10/05/2020 JLC 10/5/2020
RBDMS HEW 10/28/2020
NK-15 Convert to Producer
Integrity Engineer:Aras Worthington (907) 440-7692
Ops Engineer:Kirsty Schultz (907) 564-5258
Ops Manager: Bo York (907) 777-8345
Expected Start Date:August 31, 2020
History
Drilled and completed in 1997 and then rotary sidetracked in 2018 as an injector in the Raven
field. The well was back-flowed in December of 2019 but never put on injection.
Objective
Isolate existing perforations, shoot Sag perforations, and flow the well back to determine if it will
make a competitive producer.
Procedural steps
Slickline or Eline
1. Set a CIBP or CBP @ ~14,450’ MD (or deeper if achievable) to isolate existing perforations.
2. Shoot perforations in the Sag from 14,167’ – 14,197’ MD and 14,205’ – 14,244’ MD.
Wells Support
1. RU Temporary Flowback iron to an adjacent well.
2. Flowback the well for no more than 14 days without a SSSV (K-valve) to obtain representative well
tests.
3. If the well tests prove the well is competitive then tie-in the well permanently as a Producer.
4. Flowback the well again for no more than 14 days without a K-valve to get representative well tests
and flowing pressures down the well’s flowline in order to properly design K-valve.
5. Install K-valve and flow the well as a Producer.
* If second flow back without a K valve is required:
Submit a new 10-403 with a complete description of tagging, monitoring, witnessed performance testing,
accurate schematics, and MPSP described.
*Pressure test piping to MPSP. Performance test of safety valves.
24 hour notice to AOGCC for performance test witnessing.
Pressure test flow back piping to minimum of MPSP.
Performance test safey valves. AOGCC to witness.
3. MIT-IA (or set plug, CMIT TxIA, pull plug).
Prior to flowing, well to be tagged per 20 AAC 25.265(m).
2
Bridge Plug with 25’ of cement between
8050’ and 8500’ MDSuperceded
I
CIBP @ ~14450’ MD or deeperSuperceded
NK-15ANK-12CNK-15ANK-12CSuperceded
CIBP @ ~14450’ MD or deeperPerforations 14,167-14197, 14205-14244
NK-15ANK-12CNK-15ANK-12C
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
RECEIVED
ncr, 1 e nn.n
1. Operations Performed
Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑
Pull Tubing ❑Ope
❑
Suspend ❑ Perforate Q Other Stimulate ❑
Alter Casing ❑ Ch tl m
gi Ap' r 0Qd TFO d
❑
Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑
Re-enter Susp Well ❑ Other:
❑
2. Operator Name: BP Exploration (Alaska), Inc
4. Well Class Before Work
Development ❑
Explo2tory ❑
5. Permit to Drill Number 216-175
3. Address: P.O. Box 196612 Anchorage,
AK 99519-6612
Stratigraphic ❑
Service Q
6' API Number: 50-029-22745-01-00
7 Property Designation (Lease Number): ADL 034630 8 034635
B.
Well Name and Number: PBU NK -15A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10.
Field/Pools:
PRUDHOE BAY, RAVEN OIL
11. Present Well Condition Summary:
Total Depth: measured 16752 feet Plugs
measured None feet
true vertical 9800 feet Junk
measured None feet
Effective Depth: measured 16702 feet Packer
measured 13834 feet
true vertical 9813 feet Packer
true vertical 9372 feet
Casing: Length: Size: MD:
TVD: Burst: Collapse:
Structural
Conductor 80 20" 49-129
49-129 1530 520
Surface 7324 13-3/8" 48-7372
48-5075 5020 / 5380 2260/2670
Intermediate 7442 9-5/8' 45-7487
45-5107 6870 4760
Liner 6853 7" 7285-14138
5051 -9617 7240 5410
Liner 2785 4-1/2" 13965 - 16750
9477 - 9801 8430 7500
Perforation Depth: Measured depth: 16060 - 16700 feet
True vertical depth: 9968-9814 feet
Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# L-80
44-13965 44-9477
Packers and SSSV (type, measured and 4-1/2" HES TNT Perm Packer
13834 9372
true vertical depth)
No SSSV Installed
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
Shut In
649
0
Subsequent to operation:
Shut In
2298
0
14. Attachments: (.gUireaper2ownc2s.m02ao7t a25.263)
15. Well Class after work:
Daily Report of Wei( Operations Q
Exploratory ❑ Development
❑ Service Q Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work:
Oil ❑ Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑ 1
GSTOR ❑ WINJ Q
WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Sundry Number or N/A if C.O. Exempt:
WA
Authorized Name: Sauve, Mark A
Contact Name: Sauve, Mark A
Authorized Title: GPMA/Lisburne Lead PE
Contact Email: Mark.Sauve@bp.com
Authorized Signature: Date: (Z—(7_/7 Contact Phone: +1 907 564 4660
Form 10-404 Revised 04/2017 Submit Original Only
�-.onMC�''J OEC 17 2019
Daily Report of Well Operations
PBU NK -15A
ACTIVITYnATF e I Innnn n ov
***WELL S/I ON ARRIVAL*** (Perforating)
DRIFT TO DEVIATION AT 14,816' SLM W/ 3.70" CENT, S-BLR (No sample or issues).
SET 4-1/2" WHIDDON C -SUB ON 4-1/2" XN-NIPPLE AT 13,916' SLM 113,944' MD.
PULL BK-DGLV'S FROM ST #3 (4,692' MD) & FROM ST #2 (9,602' MD).
SET BK-LGLV AT ST #3 (4,692' MD) & BK-OGLV AT ST #2 (9,602' MD).
PULL EMPTY 4-1/2" WHIDDON CATCHER SUB FROM 13,944' MD.
2/17/2019
***WELL S/I ON DEPARTURE, NOTIFIED DSO OF WELL STATUS***
CTU#9 1.75" CT. Job Scope: Mill Obstruction / Mill Shoe Track / Adperf
MIRU CTU. Perform Weekly BOP Test. MU & RIH with Baker 2-7/8" Milling BHA w/ 3.70" 5 -Bladed
Junk Mill &3.70" Carbide String Reamer. Take pipe displacement returns while rih. DryTag
obstruction at 16350'.
11/24/2019
***Continue Job on 11/25/19 WSR***
CTU#9 1.75" CT. Job Scope: Mill Obstruction / Mill Shoe Track / Adperf
Mill Obstruction at 16350'. Mill thru w/ no issues. Tag again at 16373'. Mill thru w/ no issues. Likely
cement stringers. Continue milling to PBTD. Tag PBTD at 16639'. Pump 10 bbl gel pill & chase
ooh. Make up HES 2-7/8" Logging Carrier w/ 3.63" JSN. Tag PBTD at 16651'. Log from
compression up to 11275'. Flagged pipe at 16550'. Pooh. Receive good data ( + 8 ' Correction ).
Correlated to Baker Hughes MWD GR/Res Mar -2-2018. Corrected EOP at Flag= 16545.53'.
Corrected PBTD = 16656.14'. MU & RIH w/ Baker 2-7/8" Milling BHA w/ 3.70" Diamond Speed Mill
w/ Tempress.
11/25/2019
***In Progress***
CTU#9 1.75" CT. Job Scope: Mill Obstruction / Mill Shoe Track / Adperf
Continue Rih w/ Milling BHA. Tag PBTD 16648' down / 16639' up. Correct Bottom of Mill to
Corrected PBTD Depth of 16656.14'. Begin Milling Liner Wiper Plug. First motor work seen at
16661.5'. Mill through LWP and down to float collar. Tag new PBTD at 16701.6'. PUH and paint
flag at 16625' corrected to Mill face. POOH. Change packoffs. MU & RIH w/ Sib 2-7/8" x 31' PJ
Omega Perf Gun #1. Tag PBTD & Correct Depth. Puh & Perforate Interval 16669'- 16700'. Pooh.
*** New PBTD = 16701.6' ***
11/26/2019
***In Pro ress***
CTU#9 1.75" CT. Job Scope: Mill Obstruction / Mill Shoe Track / Adperf
Continue Pooh w/ Pef Gun #1. All shots fired, ball recovered. MU & RIH w/ Sib 2-7/8" x 31' PJ
Omega Perf Gun #2. Tie into PBTD and shoot 16640-16671'. POOH and FP well. All shots fired, ball
recovered. RDMO CTU.
11/27/2019
***Job Com lete***
TREE= 6" CNV
WELLHEAD =
FMC GEN. 5
ACTUATOR=
BAKER
OKB. ELEV =
59.9
BF. ELEV =
22.35'
KOP =
2500'
Max Angle =
105° @ 16249'
Datum MD=
13705'
Datum TVD =
9200' SS
Minimum ID = 3.725" @ 13944'
4-1/2" XN NIPPLE
TOP OF 7" LNR 72
WHIPSTOCK (02/10/18) 7487-
t, L-80 BTC, ID = 8.681" -7487'
7" TOC I-1 -11437'
JT, .0152 bpf, D = 3.958" --L_13965-
7-
-13965'7" LNR, 26#, L-80 VT HC, 14138'
0383 bpf, D = 6.276"
SHOE TRACK
52 bpf, D = 3.958"
K -15A
PERFORATION SUMMARY
SAFETYNOTES: WELL REQUIRES A SSSV. j
HORIZONTAL WELL. WELL ANGLE> 70" @ 75801.
DATE
REF LOG: BKR MWD ON 03/02/18
0424197
ANGLE AT TOP PERF: 99" @ 16060'
07/17/18
Note: Refer to Production OB for Instorical erfdata
SIZE
SPF
INTERVAL O NS z I
DATE
2.88"
6
16060 -16090 O
10/13/18
2-3/4"
6
16090 -16110 O
03/15/18
2.3/4"
6
16110 -16170 O
10/13/18
23/4"
6
16200 -16220 O
03/15/18
2-7/8"
6
16640 -16671 O
11/27/19
2-7/8"
6
16669 -16700 O
11/26/19
SHOE TRACK
52 bpf, D = 3.958"
K -15A
REV BY
SAFETYNOTES: WELL REQUIRES A SSSV. j
HORIZONTAL WELL. WELL ANGLE> 70" @ 75801.
DATE
MAXDLS:19.1°@7502'.
0424197
ORIG COMPLETION, (POOL 7)
07/17/18
1789' 13-3/8" HES CEMENTER
03107118
P-272
ST NK -15A)
08/14/18
1994' 4-1 /2" HES X NIP, ID = 3.813"
03/08/18
JMD
DRLG HO CORRECTIONS
11/06/18
GAS LFT MANDRELS
-
03/12/18
BG/JMD
ODE APPROVAL
02/18/19
---E - TYPE-- — -. .
ST MD ND
SDEV VLV LATCH R7RT_. DATE
0321/18
OG/JMD
GLV C/003/12/18
12/11/19
__
3 4692 4259 60 KBG-2 DOME --BK -- - 16 02/17/19
0321/18
JCF/JMD
PERFS & OBSTRUCTION
2 9602 6064 49 KBG-2 SO BK 22 02/17/19
1 11466 7490 38 KBG-2 DMY BK 0 03/06/18'
& WFT WPHR HGR, D = 6.19"
MILLOUT WINDOW (NK -16A) 7487'- 7501'
14-112" HES X NP, ID = 3.813" 1
17" X 4-1/2" HES TNT PKR, ID = 3.856"
-------------
4-1/2" HES X NIP. ID = 3.813"
13944' —14-1/2" HES XN NP. ID = 3.725"
13965-)4-1/2"WLEG,m=3.958"�
13965' 7"X 5" WFT LTPw/TEBK SLV & WFT
HGR D=4.29"
13985'5" X 4-1/2" XO, D = 3.92"
DATE
REV BY
COMMENTS
DATE
REV BY COMMENTS
0424197
ORIG COMPLETION, (POOL 7)
07/17/18
GJB/JMD GLV C/O (07114118)
03107118
P-272
ST NK -15A)
08/14/18
GJB/JMD GLV C/O (08/12/18)
03/08/18
JMD
DRLG HO CORRECTIONS
11/06/18
JTC/JMD OBSTRUCTION TAG &ADPERFS
03/12/18
BG/JMD
ODE APPROVAL
02/18/19
GJB/JMD GLV C/O (02117/19)
0321/18
OG/JMD
GLV C/003/12/18
12/11/19
JCF/JMD MILLED SHOETRACK & ADPERFS
0321/18
JCF/JMD
PERFS & OBSTRUCTION
NIAKUK UNIT
WELL: NK -15A
PERMIT No: 216-175
API No: 50-029-22745-01
, T12N, R15E, 1373' FSL & 91 E
BP Exploration (Alaska)