Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout217-0027. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU C-11B Tubing Swap RWO Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 217-002 50-029-20382-02-00 341J ADL 0028305 13432 Conductor Surface Intermediate Production Liner 9014 2636 8164 6551 1611 3790 9645 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 8953 31 - 2667 29 - 8193 2484 - 9035 8874 - 10485 9642 - 13432 2500 31 - 2667 29 - 7687 2484 - 8425 8278 - 9015 8952 - 9014 13411 2670 4760 5410 7500 10530 9645, 12442 5380 6870 7240 8430 10160 11950- 13362 4-1/2" 12.6# L-80 27 - 88799020 - 9014 Structural 79 20" x 30" 32 - 111 32 - 111 4-1/2" Baker S3 Packer No SSSV Installed 8823, 8231 Date: Torin Roschinger Operations Manager Michael Hibbert michael.hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY 10/9/2024 Current Pools: Prudhoe Oil Proposed Pools: Prudhoe Oil Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 12:37 pm, Sep 26, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.09.25 14:19:25 - 08'00' Torin Roschinger (4662) 324-554 * BOPE test to 2500 psi. DSR-9/27/24SFD 9/30/2024MGR01OCT24 10-404 JLC 10/2/2024 Gregory Wilson Digitally signed by Gregory Wilson Date: 2024.10.02 13:59:02 -08'00'10/02/24 RBDMS JSB 100324 RWO – Tbg Swap PBU C-11B PTD:217-002 Well Name:PBU C-11B API Number:50-029-20382-02 Current Status:Not-Operable; TxIA Rig:CDR2 or Innovation Estimated Start Date:10/15/2024 Estimated Duration:6days Reg.Approval Req’std?10-403 Date Reg. Approval Rec’vd: Regulatory Contact:Abbie Barker First Call Engineer:Michael Hibbert 907-903-5990 (O)907-903-5990 (M) Second Call Engineer:Aras Worthington (907) 564-4763 (O)907-440-7692 (M) Current Bottom Hole Pressure:3,250 psi @ 8,800’ TVD Reservoir Est KWF 7.4 ppg Plan on using 8.4 ppg fluid throughout the RWO – based on last SI WHP Max. Anticipated Surface Pressure:2,500 psi (Based on last SI WHP) Last SI WHP:2500 psi (7/21/2024) Min ID:2.313” X-nipple in PTSA @ 9,645’ MD Max Angle:95 Deg @ 10,540’ MD/ 70 deg @ 9,752’ MD Brief Well Summary: C-11B is a naturally flowing Not Operable Ivishak production well. C-11B currently has TxIA communication and fails an MIT-T. The well has a patch in the 4-1/2” tubing, covering a leak in GLM #4 (found in 2006), and new tubing leak below the top patch at 6290’ was found on 8/2/24 with an acoustic LDL. The tubing and IA were loaded and an XX plug was installed in the PTSA nipple at 9,645’ to secure the well. The well passed a CMIT-TxIA to 2500 psi on 7/31/24. This verifies the production casing and packer have integrity. Objective: Pull tubing patch. Circulate well to 1% KCL/seawater. Pull the existing 4-1/2” tubing. Run new 13Cr 4-1/2” completion with stacker packer. Achieve a passing tubing and casing MITs. Return the well to production. Well Completion Information: Tree: CIW – 6-3/8” bore x 7-1/16” flange Wellhead: FMC – 13-5/8” Existing Production Packer: 7” x 4-1/2” BKR S-3 Packer Pre RWO work: Wellhead: 1. PPPOT-T to 5000 psi, PPPOT-IC to 3500 psi – completed 9/21/24. PPPOT-T/IC both passed. Slickline & Fullbore: 2. Pull tubing patch from 3289’ a. Send to Baker to be redressed if possible. 3. Pull XX plug. Set RWO PX plug at 8846’. 4. Pull dummy valve from GLM #1 and leave open. 5. CMIT-TxIA to 2500 psi with crude/diesel. Need 10-403 Sundry Approval before executing any of the following steps: E-line: 6. Mechanically cut tubing @ 8760’, 9’ below collar at 8751’ per the tubing tally. a. 9’ below top collar of 41’ joint between lowest GLM and nipple at 8802’. RWO – Tbg Swap PBU C-11B PTD:217-002 Fullbore: 7. Circ well to 1% KCL. 8. Either wait 1-2 hours and circ additional crude out of the well after fluids swap or return the following day to circ out remaining crude. 9. Place diesel cap on tubing and IA. DHD: 10. Bleed WHP to 0 psi. Valve Shop: 11. Set and test TWC – J style 6-3/8” a. Will need hydraulic lubricator to install RWO Procedure: 12. MIRU Workover Rig. 13. Nipple down tree and tubing head adaptor. Inspect landing threads. 14. NU BOPE configuration top down: Annular, 2-7/8”x 5-1/2” VBRs, blind/shear rams and integral flow cross. 15. Test BOPE to 250psi Low/3,000psi High, annular to 250psi Low/2,500psi High (hold each ram/valve and test for 5-min). a. Record accumulator pre-charge pressures and chart tests. b. Notify AOGCC 24 hrs in advance of BOP test. c. Confirm test pressures per the Sundry Conditions of approval. d. Test the 2-7/8”x 5-1/2” VBRs with 4-1/2” test joint. e. Test the annular with 4-1/2” test joint. f. Submit a completed 10-424 form to the AOGCC within 5 days of BOPE test. 16. RU and pull TWC. a. Will need hydraulic lubricator to pull 17. Rock out diesel freeze-protect. 18. MU landing joint or spear, BOLDS and pull hanger to the floor. a. Expected PU weightin 8.4ppg = 96k-lbs calculated. b. Old 4-1/2” tally has 125k as the landing weight. 19. Pull 4-1/2” tubing to floor, circulate bottoms up. 20. Lay down 4-1/2” completion. Tubing hanger and tubing will not be salvaged. 21. Run 4-1/2” 13Cr Vam Top gas lifted tubing string with stacker packer completion a. Torque turn connections. Will need hydraulic lubricator to pull RWO – Tbg Swap PBU C-11B PTD:217-002 22. Land Hanger and reverse in corrosion inhibited 8.4 ppg KCl or seawater. 23. Drop ball and rod and set packer. 24. Perform MIT-T to 2,500 psi. 25. Bleed off tubing pressure to 1000 psi and MIT-IA to 2,500 psi for 30 charted minutes. 26. Bleed tubing pressure down to shear the shear out valve in the top GLM. FP Tubing and IA with diesel to 2200’ MD. 27. Set TWC. 28. ND BOPE 29. NU tree and tubing head adapter. 30. Test both tree and tubing hanger void to 500psi low/5,000psi high. 31. RDMO Workover Rig. Post-rig valve shop work 32. Pull TWC. Post-rig Slickline Work 33. Pull Shear-out valve, run KO GLV. 34. Pull Ball and rod and RHC profile. 35. Pull catcher and TTP. Attachments: x Wellbore Schematic x Proposed Wellbore Schematic x BOP Schematic(s) x Sundry Revision Change Form RWO – Tbg Swap PBU C-11B PTD:217-002 Current Wellbore Schematic RWO – Tbg Swap PBU C-11B PTD:217-002 Proposed Wellbore Schematic RWO – Tbg Swap PBU C-11B PTD:217-002 CDR2 BOP Stack Innovation BOP Stack RWO – Tbg Swap PBU C-11B PTD:217-002 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HNS Prepared By (Initials) HNS Approved By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will planned perforations require a spacing exception?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStrastigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other: Post Initial Injection MIT Req'd? Spacing Exception Required?Yes Yes No No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU C-11B Extended Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 217-002 50-029-20382-02-00 341I ADL 0028305 13432 Conductor Surface Intermediate Production Liner 9014 2636 8164 6551 1611 3790 12919 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 9017 31 - 2667 29 - 8193 2484 - 9035 8874 - 10485 9642 - 13432 2500 31 - 2667 29 - 7687 2484 - 8425 8278 - 9015 8952 - 9014 None 2670 4760 5410 7500 10530 12919 5380 6870 7240 8430 10160 12520 - 13362 4-1/2" 12.6# L-80 27 - 88799016 - 9014 Structural 79 20" x 30" 32 - 111 32 - 111 4-1/2" Baker S-3 Perm Packer No SSSV Installed 8823, 8231 Date: Torin Roschinger Area Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com PRUDHOE BAY 6/1/2023 Current Pools: PRUDHOE OIL Proposed Pools: Prudhoe Oil STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 10/2022 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov 907-903-5990 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.05.18 11:15:31 -08'00' Torin Roschinger (4662) By Grace Christianson at 3:12 pm, May 25, 2023 323-294 7/15/2023 MDG 6/29/2023 MGR02JUN23 2500 10-404 3 DSR-5/25/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.06.29 16:18:30 -05'00' &': 07/03/23 RBDMS JSB 071123 Plug and Add Perf C-11B PTD: 217-002 Well Name:C-11B CTU Plug & Add Perf API Number: 50-029-20382-02 Current Status:Producing Rig:CTU & Surface Deployed TCP Guns Estimated Start Date:5/31/2023 Estimated Duration:3 days Reg.Approval Req’std? N/A Date Reg. Approval Rec’vd:N/A Regulatory Contact:Abbie Barker Permit to Drill Number:217-002 First Call Engineer:Marshall Brown (601) 613-0173 (M) (601) 613-0173 (M) Second Call Engineer:Michael Hibbert (907) 903-5990 (M) (907) 903-5990 (M) Current Bottom Hole Pressure:3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP) Maximum Expected BHP:3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP) Max. Anticipated Surface Pressure:2500psi (Based on SI TBG pressure 2/7/21) Last SI WHP:2500 psi (Taken on 2/7/21) Min ID:2.313” X NIP at 9645’ MD Max Angle:95 deg at 10540’ Reference Log:SLB Memory Cement Eval Log dated 7/3/2017 Brief Well Summary: A 2017 natural flow sidetracked into Z1B, C-11B had 312’ of initial/open toe perfs. In April of 2021, the toe was isolated by CIBP and the second stage of perfs added. Recently, the second stage of perfs has reached marginal GOR. The goal of this program is to move to the third stage of perforations to return well to economic GOR. Objective: Add 250’ of perfs. Notes On Wellbore Condition: x Last down hole intervention in liner: coiled tubing RIH 04/2021, set CIBP and perforated from 12,520’ – 12,770’ x Gas lift – DPBGL needed to help kick off well Procedure: Service Coil – Mill Plug: 1.MIRU CTU, MU PCE 2.MU 2.3” Milling BHA a.WSS discretion to use a Venturi Burn shoe or junk mill b.Objective is to mill plug and push to bottom 3.RIH loaded well with safelube as needed 4.Mill CIBP at ~12,919’ and push to bottom, POOH Notes x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Service Coil – Drift/Log/Set Plug: 5. MU 2.20” logging carrier with GR/CCL and 2.25” nozzle Plug and Add Perf C-11B PTD: 217-002 6. RIH and tag TD at ~13,413’ a. Log OOH to 10,500’ b. Flag Pipe near plug setting depth at 12,450’ and top perf @ 11,950’ c. Send Log to OE to verify tie-in 7. Bullhead ~170 bbls of 8.4 ppg 1% KCl or equivalent down the tubing to the formation. a. Wellbore volume = 9600’ X .0152bpf + .0079bpf x 1000’ +.0058 bpf x 2700’= 170 bbls 8. Confirm well is dead. Freeze protect tubing as needed. 9. MU 2-7/8” CIBP and RIH, correct to flag. a. Contact OE Marshall Brown 601-613-0173 or Michael Hibbert 907-903-5990 prior to setting plug/perforating for final approval of tie-ins 10. Set plug mid-joint at ±12,450’ MD and test to 1500 psi. 11. POOH and prepare for open hole deployment of guns Service Coil – Extended Ad-Perf: Sundry Procedure (Approval Required to Proceed) Coil Tubing – Extended Add Perf 1. Prepare for deployment of 2”, 6 SPF, 60 degree phasing TCP guns. 2. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/ KWF as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is re-established. a. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 3. Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a. At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 4. Break lubricator connection at QTS and begin makeup of TCP guns. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Table 1: C-11B Proposed Ad-Perf Gun Runs 5. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per RE/OE. POOH. 6. Note any tubing pressure change in WSR. 7. After perforating, PUH to top of liner or into tubing tail to ensure debris do not fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary, before pulling to surface. 8. Pump pipe displacement while POOH. Stop at surface to reconfirm well dead and hole full. 9. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 10. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 11. Once guns are pulled, coordinate with operations to determine if a freeze protect is required or if the well will be brought online. FP well as required. 12. RDMO CTU Gun Run # Perf Top Perf Bottom Perf Length 1 11,950’ 12,200’ 250’ Total 250’ Make up PCE. Plug and Add Perf C-11B PTD: 217-002 Attachments: 1. As-built Schematic 2. Proposed Schematic 3. BOP Schematic 4. Standing Orders for Open Hole Well Control During Perf Gun Deployment 5. Equipment Layout Diagram 6. Tie in Log 7. Sundry Change Form Plug and Add Perf C-11B PTD: 217-002 As-built Schematic: Plug and Add Perf C-11B PTD: 217-002 Proposed Schematic: Plug and Add Perf C-11B PTD: 217-002 BOP Schematic Plug and Add Perf C-11B PTD: 217-002 Plug and Add Perf C-11B PTD: 217-002 Plug and Add Perf C-11B PTD: 217-002 Tie in Log: Plug and Add Perf C-11B PTD: 217-002 Plug and Add Perf C-11B PTD: 217-002 Plug and Add Perf C-11B PTD: 217-002 Plug and Add Perf C-11B PTD: 217-002 Plug and Add Perf C-11B PTD: 217-002 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU C-11B Tubing Swap RWO Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 217-002 50-029-20382-02-00 13432 Conductor Surface Intermediate Production Liner 9014 2636 8164 6551 1611 3790 12442 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 9018 31 - 2667 29 - 8193 2484 - 9035 8874 - 10485 9642 - 13432 31 - 2667 29 - 7687 2484 - 8425 8278 - 9015 8952 - 9014 13411 2670 4760 5410 7500 10530 12442 5380 6870 7240 8430 10160 11950- 13362 4-1/2" 12.6# 13cr80, L-80 27 - 8879 9020 - 9014 Structural 79 20" x 30" 32 - 111 32 - 111 4-1/2" HES TNT Packer 8823, 8231 8618, 8823 8045, 8231 Torin Roschinger Operations Manager Michael Hibbert michael.hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028305 27 - 8282 N/A N/A 669 458 46478 38982 103 60 1400 1150 1100 900 324-554 13b. Pools active after work:Prudhoe Oil 4-1/2" Baker S3 Packer 8618, 8045 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations No SSSV Installed By Grace Christianson at 4:04 pm, Oct 22, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.10.22 15:35:14 - 08'00' Torin Roschinger (4662) RBDMS JSB 103124 WCB 2-10-2025 DSR-10/23/24 ACTIVITY DATE SUMMARY 9/28/2024 ***WELL S/I ON ARRIVAL*** RAN 2' x 1-7/8" STEM, 3.80" G-RING & TAGGED 45 KB BKR ONE TRIP PATCH @ 3289' MD (no issues) PULLED 45 KB BKR ONE TRIP PATCH @ 3268' SLM (Recovered 1 Caliper Arm) RAN 2.25'' x 5' P. BAILER TO XX PLUG @ 9645' MD (Empty) RAN 2-7/8'' SHEARABLE EQ. PRONG TO XX PLUG @ 9645' MD ***WSR CONT. ON 09-29-2024*** 9/29/2024 ***WSR CONT. FROM 09-28-2024*** PULLED 2.313'' XX PLUG @ 9646' MD SET 3.80'' PX PLUG @ 8846' MD SET WHIDDON CATCHER @ 8815' SLM PULL BK-DGLV FROM STA #1 @ 8734' MD- LEAVE OPEN POCKET PULLED 4-1/2" WHIDDON FROM TOP OF P-PRONG @ 8809' SLM ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS*** 9/30/2024 T/I/O= 193/2/30. LRS 72 CMIT-TxIA (RWO EXPENSE). Bled gas off the TBG while pumping 8.3 bbls of crude into the IA. Shut in the bleed and pumped 5 more bbls to achieve test pressure. TxIA lost 126/134 psi during the first 15 minutes and 60/61 psi during the second 15 minutes. TxIA lost 186/195 psi during the 30 minute test. Bled back 4.4 bbls to Final T/I/O= 224/200/34. 9/30/2024 T/I/O = 190/0+/30. Temp = SI. T & IA FL (FB req). No AL. T FL @ 480'. IA FL @ surface. Pumpers in control of well upon departure. SV, SSV, WV = O. WV = C. IA, OA = OTG. 13:00 10/1/2024 *** WELL S/I ON ARRIVAL*** OBJECTIVE WELLTEC TBG CUT RIG UP YJ ELINE. PT PCE 300 PSI LOW / 3000 PSI HIGH, FUNCTION TEST WLVS RIH W/ WELLTEC " MECHANICAL CUTTER CUT 4 1/2" TBG @ 8761'' 10' BELOW THE COLLAR @8751' CUT DIAMETER INDICATOR SHOWS 4.60" ON SURFACE RDMO YELLOWJACKET ELINE JOB COMPLETE ***WELL S/I ON DEPARTURE**** 10/2/2024 T/I/O= 50/50/31. LRS 72 CircOut (RWO EXPENSE). Pumped 100 bbls of deep clean and 360 bbls of 1% KCl into the IA while taking TBG returns to the F/L. Freeze protect TxIA with 141 bbls of diesel. FWHPs 23/24/42. 10/3/2024 T/I/O = SI/0/0 Free up & change 2 LDS, 1LDS at 6 o'clock still stuck, cut off flush with gland nut. Will grind off tip when we nipple down for RWO & leave as a blank. FWP's = SI/0/0 10/3/2024 T/I/O=0/0/0. Pre RWO. Set 6" "J" TWC #423 @125" with CIW lubricator.*** Job Complete*** Final WHP's TWC/0/0. 10/3/2024 T/I/O=TWC/0/0. Pre RWO. Removed 6x7 CIW upper tree and install tree cap on MV. Torque to spec. PT tree cap against MV to 300/5000 psi. Pass. ***Job Complete*** Final WHP's TWC/0/0. Daily Report of Well Operations PBU C-11B RIG UP YJ ELINE. PT PCE 300 PSI LOW / 3000 PSI HIGH, FUNCTION TEST WLVS RIH W / WELLTEC " MECHANICAL CUTTER CUT 4 1/2" TBG @ 8761'' 10' BELOW THE COLLAR @8751' Daily Report of Well Operations PBU C-11B 10/6/2024 PBU C-11B RWO Scope: Rig released from C-18B at 00:00. Rig up LRS and freeze protect C-18B with 173bbls diesel down the IA and allow u-tube, 290psi left on T/IA. Scope down derrick, complete rig move checklists, and swap power from gens to coldstart at 04:30. Cruz trucks on location at 06:00. RDMO C-18B and MIRU on C- 11B. Cruz trucks released at 13:30. Scope derrick, bridal down, and complete checklist. Rig accepted at 19:00. N/D Tree, inspect and clean tubing hanger - Good. N/U BOPE. ***CONT WSR ON 10/07/2024*** 10/7/2024 PBU C-11B RWO Scope: Finish N/U BOPE. Flood lines and observe leak at trip riser, replace o-ring and re-install - Good. Finish rigging up test tools/equipment. Test BOPE per Sundry, witnessed waived by AOGCC rep Sean Sullivan, 1 F/P on Blinds. Changed out leaking CTS plug in hanger during test. R/D Test equipment. Pull TWC, M/U Landing jt, and BOLDS. Unseat hanger at 116K. Rock out freeze protect with 46bbl heated soap pill chasing with 8.4ppg sea water, overboarded 141bbls diesel. Bring hanger to floor and L/D, 124K free travel. POOH laying down 4-1/2" De- completion F/ 8760' - T/ 2790'. ***CONT WSR ON 10/07/2024*** 10/7/2024 T/I/O=0/0/0 check void for psi, nipple down THA, clean void and TWC profile, grind off nose (1) seized up LDS, M/U 7" NSCC lift sub 9RH turns, B/O and L/D, function LDS 1 at a time, 4-1/4" C/B, retorqued to 500 ft/lbs, all functioned as should, install new BX-160, stand by for BOP N/U, after BOP test pull 6-1/2" J-plug, M/U 7" NSCC lift sub 9RH turns, B/O LDS, (1) LDS broke but was able to be backed out fully, will replace upon completion, pull hanger, standy by while rig circulates, Final WHP's T/I/O=0/0/0 10/8/2024 PBU C-11B RWO Scope: Continue POOH with 4-1/2" De-completion F/ 2790' - T/ Surface. Clean and clear rig floor and rig up Parker TRS TQ turn equipment. Stage jewelry in pipe shed. RIH with 4-1/2" 12.6# L-80 13-Cr VamTop upper completion tagging No-Go at 8765', perform space out with no pups putting bottom of overshot mule shoe at 8762.2' once hanger landed (8.2' swallow over cut jt). Reverse circulate in 265bbls displacing the IA to 8.4ppg 1%KCL CIB. Drop ball/rod and observe packer set at 1950psi. Perform MIT-T and MIT-IA to 2500psi for 30 min each - Good. Flush and B/D BOP'S and all surface lines. N/D BOPE, N/U Tree. Test Tree and Hanger void T/ 500/5000 - Good. R/U Lines for Freeze protect. ***FINAL WSR*** Rig released at 00:00 10/8/2024 T/I/O=0/0/0 RWO completion, Make up hanger to tubing string, drain BOP through IA, land hanger on RKB, verify landed by looking @ mark on pup through IA valve, run in lock down screws, torque to 500 ft/lbs, tighten glandnuts, stand by for circulating, testing, drop ball & rod. Set 4" H TWC, stand by for BOP nipple down, clean void, ring groove, & hanger, install new SBMS & BX-160, c/o broken LDS but new LDS started to gall, left the new LDS out far enough to clear bowl, nipple upTHA oriented same as the other wells in the row, test void 500 psi/5 min, 5000 psi/30 min., 25 psi loss in first 15 mins, 0 psi in second 15 mins, good tests, bleed off test psi, stand by for successful tree test, pull TWC w/ T-bar, RDMO T/I/O=0/0/0 10/9/2024 Assist I rig with Freeze protect. Pump 172 bbls DSL down IA. gg g RIH with 4-1/2" 12.6# L-80 13-Cr VamTop upper completionjy tagging No-Go at 8765', perform space out with no pups putting bottom of overshot gg g mule shoe at 8762.2' once hanger landed g g Perform MIT-T and MIT-IA to 2500psi for 30 min each - Good Test g gg g BOPE per Sundry, witnessed waived by AOGCC rep Sean Sullivan Daily Report of Well Operations PBU C-11B 10/10/2024 T/I/O=0/0/0. Post I-RIg RWO, Removed SV from DH configuration and installed new 4" CIW production tree. Torqued to specs. PT'd against MV to 300/5000 psi (Passed). Connect production flowlines and set wellhouse. FWHP's = 0/0/0. ***Job Complete*** 10/11/2024 ***WELL S/I ON ARRIVAL*** PULLED B&R FROM 8686' MD PULLED ST#2 BK-DGLV FROM 6137' MD PULLED ST#3 BEK- SHEAR VLV FROM 3374' MD SET ST#3 BK-LGLV (16/64'' ports,1500# tro) @ 3374' MD SET ST#2 BK-OGLV @ (22/64'' ports) @ 6137' MD PULLED 3.81'' RHC PLUG BODY FROM 8686' MD ***WSR CONT ON 10-12-24*** 10/12/2024 ***WSR CONT FROM 10-11-24*** PULLED P-PRONG FROM PX-PLUG BODY @ 8686' MD ATTEMPED TO PULL 3.81'' PX- PLUG BODY FROM 8846' MD RAN KJ,10' x 2.50'' P. BAILER (msfb) TO 8820' SLM, GET STUCK / FREE AFTER 16HOURS... (see log) (full bailer of muck / metal shavings) ***JOB INCOMPLETE, WELL LEFT S/I**** ****** 3.81'' PX PLUG BODY LEFT IN HOLE @ 8846' MD, NO P-PRONG, POSSIBLY PLUGGED OFF****** 10/12/2024 T/I/O=0/0/30 Assist Slickline ( Stuck In Hole ) Pressure test lateral to 1500 psi. Pump 202 bbls diesel down IA taking returns through SO valve up TBG to production. Pumped 1.5 bbls DSL down TBG, Bleed TBG down to zero, ***Job continued to 10-13-24*** 10/13/2024 *** Job continued from 10-12-24*** (RWO EXPENSE) Pumped 9 bbls 60/40 and 143 bbls crude to FP FL, Well secured, DSO notifed upon departure, FWHP= 0/0/28 10/13/2024 ***WELL S/I ON ARRIVAL*** (RWO expense) BAILED SAND & ALUMINUM PIECES FROM PLUG BODY @ 8,846' MD PULLED 3.81" PX PLUG BODY FROM 8,846' MD ***WELL S/I ON DEPARTURE*** PULLED 3.81" PX PLUG BODY FROM 8,846' MD Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:217-002 6.50-029-20382-02-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 13432 12919 9017 8823 None 12919 8231 Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 79 20" x 30" 32 - 111 32 - 111 Surface 2636 13-3/8" 31 - 2667 31 - 2667 5380 2670 Intermediate 8164 9-5/8" 29 - 8193 29 - 7687 6870 4760 Liner 6551 7" 2484 - 9035 2484 - 8425 7240 5410 Liner 1611 4-1/2" 8874 - 10485 8278 - 9015 8430 7500 Perforation Depth: Measured depth: 12520 - 13362 feet True vertical depth:9016 - 9014 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 27 - 8879 27 - 8283 8823 8231Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker S-3 Perm Packer Liner 3790 9642 - 13432 8952 - 9014 10160 10530 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 879135038408 27929526 1250 37404 1146 853 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Wyatt Rivard wrivard@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.777.8547 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon …Plug Perforations 5 Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9014 Sundry Number or N/A if C.O. Exempt: 321-152 No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Extended Perf w CTU Operations shutdown … Change Approved Program 5 N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028305 PBU C-11B 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations 3-1/2" x 3-1/4" x 2-7/8" By Meredith Guhl at 9:57 am, May 10, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.05.09 10:43:00 -05'00' Stan Golis (880) DSR-5/10/21MGR29JUL2021 SFD 5/10/2021RBDMS HEW 5/12/2021 ACTIVITY DATE SUMMARY 4/22/2021 CTU#9 1.75" CT Job Scope: Depth Log, CIBP, Extend Adperf MIRU CTU. ***Job Continued on 04/23/21*** 4/23/2021 CTU#9 1.75" CT Job Scope: Depth Log, CIBP, Extend Adperf Pump 1.188" drift ball through coil. Perform Weekly BOP Test. MU 2.20" HES logging carrier with 2.25" JSN drift & RIH. Log up from 13000' to 12400'. Paint flag at 12900'. At surface, download data, + 4' correction. Corrected EOP = 12,895'. MU & RIH with NS 2-7/8" CIBP. Tie in at flag, correct depth. Set top of plug at 12919'. PT to 1000 psi. Pooh. ***Continue on 04/24/21*** 4/24/2021 CTU#9 1.75" CT Job Scope: Depth Log, CIBP, Extend Adperf At surface. LD NS setting tools. Deploy HES MaxForce perf gun. . RIH & correct depth via CIBP. Perforate from 12520'-12770' using 2" HES MaxForce. POOH pumping across the top. LD perf guns. FP well w/ 200bbls of diesel to help kick off well. RDMO. ***Complete*** Daily Report of Well Operations PBU C-11B 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU C-11B Extended Perf w CTU, Mill CIBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 217-002 50-029-20382-02-00 13432 Conductor Surface Intermediate Production Liner 9014 2636 8164 6551 1611 3790 12442 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 9018 31 - 2667 29 - 8193 2484 - 9035 8874 - 10485 9642 - 13432 31 - 2667 29 - 7687 2484 - 8425 8278 - 9015 8952 - 9014 13411 2670 4760 5410 7500 10530 12442 5380 6870 7240 8430 10160 11950- 13362 4-1/2" 12.6# L-80 27 - 8879 9020 - 9014 Structural 79 20" x 30" 32 - 111 32 - 111 4-1/2" Baker S-3 Perm Packer 8823, 8231 8823 8231 Torin Roschinger Operations Manager Michael Hibbert michael.hibbert@hilcorp.com 907-777-8420 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028305 27 - 8282 N/A N/A 372 1863 36836 1157 64 756 50 50 1160 1160 323-294 13b. Pools active after work:Prudhoe Oil No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 4:24 pm, Sep 01, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.09.01 12:35:50 -08'00' Torin Roschinger (4662) DSR-9/1/23 RBDMS JSB 090823 WCB 3-13-2024 ACTIVITY DATE SUMMARY 8/27/2023 CTU #9, 1.75" 0.156" Job Scope: Mill CIBP, Log/drift, Set CIBP, Ext Adperfs MIRU CTU 9. MU 2.30" 4 blade junk milling BHA. RIH. Had to rotate thru Patch 3289' MD. Had to rotate thru Top LNR 9630' MD. RIH tag CIBP @ 12,954' CTM / 12,953' Mech. Mill CIBP in 4 hours and Push to Btm to 13,411' MD. POOH. LD YJ milling BHA. M/U HES memory log tool. RIH ***Continue to WSR 8/28/23*** 8/28/2023 CTU #9, 1.75" 0.156" Job Scope: Mill CIBP, Log/drift, Set CIBP, Ext Adperfs Log up from TD for depth control, POOH. BD HES Logging BHA. Good data -30' Corr. MU YJ 2-7/8" CIBP. RIH. Corr Depth at Flag. Set 2-7/8" CIBP Top @ 12,442'. Fill well and PT CIBP. Good. POOH. BD YJ Tools. ND BOPs and perform BOP Test. ***Continued to WSR on 8/29/23*** 8/29/2023 CTU #9, 1.75" 0.156" Job Scope: Mill CIBP, Log/drift, Set CIBP, Ext Adperfs Finish BOP test, M/U YJ MHA & PT. Deploy 250' HES 2"MaxForce Perf Guns. RIH. Tag CIBP corr depth. PUH and Perf 11,950' - 12,200'. POOH. Undepoly 250' of spent HES perf guns. FP well w/ 38 bbls diesel. RD Scaffolding. RDMO CTU 9. ***Job Complete*** Daily Report of Well Operations PBU C-11B RIH tag CIBP @ 12,954' CTM / g@ 12,953' Mech. Mill CIBP in 4 hours and Push to Btm to 13,411' MD. POOH. gg g Set 2-7/8" CIBP Top @ 12,442'. Job Scope: Mill CIBP, Log/drift, Set CIBP, Ext Adperfs Fill well and PT CIBP. Good. POOH. g Deploy 250' HES 2"MaxForce Perf Guns. RIH. y Tag CIBP corr depth. PUH and Perf 11,950' - 12,200'. POOH. Undepoly 250' ofg spent HES perf guns. Operator Name:2. Exploratory Development Service… …5 … Permit to Drill Number:217-002 6.API Number:50-029-20382-02-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 028305 Property Designation (Lease Number):10. 341 H 8. PBU C-11B 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon …Plug Perforations 5 Fracture Stimulate …Repair Well … Operations shutdown Extended Perf w CTU … Op Shutdown GAS … GSTOR…WAG … SPLUG … … Abandoned Oil 5 WINJ … Exploratory …Development 5Stratigraphic……Service WDSPL … 12. Attachments: PRESENT WELL CONDITION SUMMARY 13432 Effective Depth MD: L-80 11. 4/19/2021 Commission Representative: 15. Suspended … Contact Name: Wyatt Rivard Contact Email: wrivard@hilcorp.com Authorized Name: Stan Golis Authorized Title:Sr. Area Operations Manager Authorized Signature: Plug Integrity …BOP Test …Mechanical Integrity Test …Location Clearance … Other: Yes …No …Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: 5OtherAlter Casing Pull Tubing … Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: No SSSV Installed Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 9014 Effective Depth TVD:Plugs (MD):Junk (MD): …Other Stimulate Re-enter Susp Well Suspend … …Plug for Redrill 5Perforate …Perforate New Pool 8823, 8231 No SSSV Installed Date: Liner 3790 3-1/2 x 3-1/4" x 2-7/8"9642 - 13432 8952 - 9014 10160 10530 Well Status after proposed work: 16. Verbal Approval: 5 … …Change Approved Program 32 - 111 29 - 8193 29 - 7687 14. Estimated Date for Commencing Operations: BOP Sketch 31 - 2667 Conductor 7240 Proposal Summary 13. Well Class after proposed work: 4-1/2" Baker S-3 Perm Packer 12970 - 13362 9016 - 9014 4-1/2" 12.6#27 - 8879 Liner 13413 9014 31 - 2667 2670 9-5/8" 7" Contact Phone:907.777.8547 Date: 5410 2636 538013-3/8"Surface 4760 …GINJ 5 Post Initial Injection MIT Req'd? Yes No … 5 …… … Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 79 20" x 30"32 - 111 Intermediate 8164 6870 Liner 6551 2484 - 9035 2484 - 8425 1611 4-1/2" 8874 - 10485 8278 - 9015 8430 7500 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. …No 5Yes Casing Length MD TVD Burst Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic … 2500 Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. By Samantha Carlisle at 8:48 am, Mar 30, 2021 321-152 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.03.29 16:21:02 -08'00' Stan Golis (880) X 10-404 DLB03/30/2021 2500 MGR30MAR21 DSR 3/30/21 Yes …on Required? Comm. 3/30/21 dts 3/30/2021 JLC 3/30/2021 RBDMS HEW 3/31/2021 Plug and Add Perf C-11B PTD:217-002 Well Name:C-11B CTU Plug & Add Perf API Number:50-029-20382-02 Current Status:Producing Rig:CTU & Surface Deployed TCP Guns Estimated Start Date:4/19/2021 Estimated Duration:3days Reg.Approval Req’std?N/A Date Reg. Approval Rec’vd:N/A Regulatory Contact:Abbie Barker Permit to Drill Number:217-002 First Call Engineer:Wyatt Rivard (907) 777-8547 (O)(509) 670-8001 (M) Second Call Engineer:Noel Nocas (907) 564-5278 (O)(907) 229-9532 (M) AFE Number:212-00353 IOR 575 Current Bottom Hole Pressure:3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP) Maximum Expected BHP:3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP) Max. Anticipated Surface Pressure:2500psi (Based on SI TBG pressure 2/7/21) Last SI WHP:2500 psi (Taken on 2/7/21) Min ID:2.313” X NIP at 9645’ MD Max Angle:95 deg at 10540’ Reference Log:SLB Memory Cement Eval Log dated 7/3/2017 Brief Well Summary: A 2017 natural flow sidetrack into Z1B, C-11B has 312’ of initial/open toe perfs and has recently reached marginal GOR. The goal of this program is to move to next stage of perforations to return well to economic GOR. Objective:Utilize CTU to isolate existing perforations then surface deploy TCP guns with CTU to add new perfs and improve fluid rates. Sundry Procedure (Approval Required to Proceed): Note: The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging or plug set run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Coil Tubing 1. MIRU Coiled Tubing Unit and spot ancillary equipment. 2. MU GR/CCL and drift for 2-7/8” CIBP. 3. RIH below target CIBP set depth of ±12,920’ MD 4. Log up, stopping to paint flag. 5. POOH and confirm good data, obtain correction. 6. Bullhead ~220 bbls of 8.4 ppg 1% KCl or equivalent down the tubing to the formation. a. Wellbore volume = 9600’ X .0152bpf + .0079bpf x 1000’ +.0058 bpf x 2200’= 170 bbls 7. Confirm well is dead. Freeze protect tubing as needed. 8. MU 2-7/8” CIBP. and RIH and correct to flag. a. Contact OE Wyatt Rivard 1(509) 670-8001 or Noel Nocas at 1(907) 229-9532 prior to setting plug/perforating for final approval of tie-ins 9. Set plug mid-joint at ±12,920’ MDand test to 1500 psi. POOH. . Deploy tools with PCE. * Plug and Add Perf C-11B PTD:217-002 10. At surface, prepare for deployment of TCP guns. Assure excess fluids available if needed to keep hole full. 11. Confirm well is dead. Bleed any pressure off to returns tank. Kill well w/8.4 ppg 1% KCl or equivalent as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 12. Pickup safety joint and TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. 13. Break lubricator connection at QTS and begin makeup of TCP guns per Table 1: C-11B Proposed Ad-Perf Gun Run below. Gun Run #Perf Top Perf Bottom Perf Length 1 ±12520 ±12770 ±250 Total ±250 Table 1: C-11B Proposed Ad-Perf Gun Run 14. RIH and correlate to flag. Contact OE Wyatt Rivard 1(509) 670-8001 or Noel Nocas at 1(907)229-9532 prior to perforating for final approval of tie ins. 15. Pickup and perforate intervals per Table 1: C-11B Proposed Ad-Perf Gun Run. POOH. a. Note any tubing pressure change in WSR. 16. POOH. Stop at surface to reconfirm well dead and hole full. 17. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 18. RDMO CTU. 19. RTP or FP well. Attachments: 1. As-built Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Tie In Log/Perf Sheet * See note above regarding kill methods if pressure observed at surface after perforating. MU PCE to wellhead. Standing orders flow chart included with this sundry request. Plug and Add Perf C-11B PTD:217-002 Wellbore Schematic Plug and Add Perf C-11B PTD:217-002 Proposed Schematic Plug and Add Perf C-11B PTD:217-002 Coiled Tubing BOPs Plug and Add Perf C-11B PTD:217-002 Equipment Layout Diagram Plug and Add Perf C-11B PTD:217-002 Standing Orders for Open Hole Well Control during Perf Gun Deployment Plug and Add Perf C-11B PTD:217-002 C-11B Tie-In Log Plug and Add Perf C-11B PTD:217-002 Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: March 3, 2021Subject: Changes to Approved Sundry Procedure for Well C-11BSundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:217-002 6.50-029-20382-02-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 13432 13413 9014 8823 8231 Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 79 20" x 30" 32 - 111 32 - 111 Surface 2636 13-3/8" 31 - 2667 31 - 2667 5380 2670 Intermediate 8164 9-5/8" 29 - 8193 29 - 7687 6870 4760 Liner 6551 7" 2484 - 9035 2484 - 8425 7240 5410 Liner 1611 4-1/2" 8874 - 10485 8278 - 9015 8430 7500 Perforation Depth: Measured depth: 12970 - 13362 feet True vertical depth:9016 - 9014 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 27 - 8879 27 - 8282 8823 8231Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker S-3 Perm Packer Liner 3790 9642 - 13432 8952 - 9014 10160 10530 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 8825004240936465 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Wyatt Rivard wrivard@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:(907)777-8547 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon …Plug Perforations …Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9014 Sundry Number or N/A if C.O. Exempt: N/A Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Operations shutdown … Change Approved Program 5 N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend …Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well5 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 028305 PBU C-11B 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations Patch Tubing & Reset LTP 3-1/2" x 3-1/4" x 2-7/8" No SSSV Installed 482 35768 68 8791050 By Samantha Carlisle at 2:27 pm, Feb 08, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.02.08 14:06:36 -09'00' RBDMS HEW 2/8/2021DSR-2/8/21 SFD 2/9/2021MGR19FEB2021 ACTIVITY DATE SUMMARY 1/22/2021 ***WELL FLOWING ON ARRIVAL*** SET 2-7/8" XX-PLUG IN PTSA X-NIPPLE @ 9,645' MD (confirmed w/ check set) FLOW WELL TO TEST SEPERATOR (1550 oil, 230 water, 32 mm gas) EQUALIZE & PULL 2-7/8" XX PLUG FROM LTP ~61' HIGH (ltp moved up hole during flow test) ***CONTINUE ON 01/23/21*** 1/23/2021 T/I/O = 2466/455/46 TEMP= SI (PROFILE MODIFICATION ) Assist Sline as directed Pumped 245 bbls of 80* crude down tbg for load and kill. Pad op notified of well status, Sline incontrol of well upon departure. CV's= OTG FWPH's = 447/443/41 1/23/2021 ***CONTINUED FROM 01-22-21***(profile modification) LRS LOAD & KILL TBG W/ 250bbls CRUDE JAR ON PATCH @ 3,290' MD FOR 1hr LAY DOWN DUE TO WINDS ***CONTINUE AFTER WEATHER HOLD*** 1/25/2021 ***CONTINUED FROM 01/23/21***(profile modification) PULLED 45KB BAKER ONE TRIP PATCH FROM 3,290' MD (missing one full element and pieces of a second element) ***CONTINUED ON 1/26/21*** 1/26/2021 T/I/O= 800/850/20. LRS Unit 72. Assist Slickline (PROFILE MODIFICATION) Pumped 60 bbls of crude into the IA. Pumped 245 bbls of crude into the TBG. Final T/I/O= 260/1000/25 1/26/2021 ***CONTINUED FROM 01-25-21*** RAN 3.75" WIRE GRAB, 4-1/2" BRUSH TO TOP OF LTP @ 9,560' SLM (no recovery) PULLED LTP FROM 9,560' SLM RAN 2.62" WIRE GRAB, 4-1/2" BRUSH TO DEP SLEEVE @ 9,642' MD LRS LOADED 60bbls CRUDE DOWN IA RAN 4-1/2" BRUSH AND 3-1/2" BRUSH TO DEP SLEEVE @ 9,642' MD WHILE LRS LOADS TBG W/ 245bbls CRUDE RAN 45KB PACKER DRIFT W/ PTSA STINGER ASSEMBLY (oal = 16') ***CONTINUE ON 01-27-21*** 1/27/2021 ***CONTINUED FROM 01-26-21***(profile modification) SET 45 KB LTP /PTSA WITH DPU @ 9645'MD EQUALIZE 2 7/8" XX PLUG @ 9636' SLM. ***WSR CONTINUED ON 1/28/21*** 1/27/2021 T/I/O= 70/500/20 Temp= SI. LRS Unit 72 Assist Slickline. Pressure test the LTP to 1000 psi. PASSED at 966 psi. T/IA lost 41/41 psi during the 1st 15 minutes and 28/28 psi during the 2nd 15 minutes. Pumped 120 bbls of 100* F crude to achieve test pressure. Pumped into the TBG while bleeding gas from the IA until fluid at surface. Bled back 2 bbls to Final T/I/O= 800/800/24. 1/28/2021 ***JOB CONTINUED FROM 1/27/21*** PULLED 2 7/8" XX SOLID PLUG FROM PTSA @ 9634' SLM. ***WELL LEFT S/I ON DEPARTURE*** 1/30/2021 Assist E-line (PROFILE MODIFICATION) Pumped 100 bbls of 180* crude down Tbg for ELine. ELine in control of well per LRS departure. IA,OA=OTG Daily Report of Well Operations PBU C-11B Daily Report of Well Operations PBU C-11B 1/30/2021 ***WELL S/I ON ARRIVAL, DSO NOTIFIED***(patch) SET BAKER HUGHES 30' E-E, 45 KB PATCH UPPER MID-ELEMENT AT 3290', LOWER MID-ELEMENT AT 3320'. CCL TO UPPER MID-ELEMENT OFFSET: 8.8', CCL STOP DEPTH: 3281.2'. ***WELL LEFT S/I ON DEPARTURE, WELL SECURE AND TURNED OVER TO DSO***(patch schematic in well pic folder) Samuel Gebert Hilcorp Alaska, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: sam.gebert@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: DATE: 01/12/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL PBU C-11B (PTD 217-002) Production Profile 01/01/2021 Please include current contact information if different from above. PTD: 2170020 E-Set: 34572 Received by the AOGCC 01/13/2021 Abby Bell 01/14/2021 DATA SUBMITTAL COMPLIANCE REPORT 10/5/2017 Permit to Drill 2170020 Well Name/No. PRUDHOE BAY UNIT C-11 B Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20382-02-00 MD 13432 TVD 9014 Completion Date 7/3/2017 REQUIRED INFORMATION Mud Log No DATA INFORMATION Types Electric or Other Logs Run: MWD/GR/RES, GR/CCL/RPM Well Log Information: Log/ Electr Completion Status 1-0I1- Current Status 1-0I1- UIC No Samples No J Directional Survey Yes (data taken from Logs Portion of Master Well Data Maint) Data Digital Dataset Log Log Run Type Med/Frmt Number Name Scale Media No ED C 28428 Digital Data ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C AOGCC 28428 Digital Data 28428 Digital Data 28428 Digital Data 28428 Digital Data 28428 Digital Data 28428 Digital Data 28428 Digital Data 28428 Digital Data 28428 Digital Data 28428 Digital Data 28428 Digital Data 28428 Digital Data Page I of 5 Interval OH/ Start Stop CH Received Comments 10350 13432 7/25/2017 Electronic Data Set, Filename: C- 118 LWD_FINAL_FIELD_COMPOSITE_17JUN2 017_BHI_CTK.Ias 7/25/2017 Electronic File: 10435175 1-7-20171.pdf 7/25/2017 Electronic File: 12914857 3-29-2017x.pdf 7/25/2017 Electronic File: 10043536 1-17-2017.pdf 7/25/2017 Electronic File: 10435175 1-7-20171.pdf 7/25/2017 Electronic File: C-1 1B Post Run 04 USR ' 10043536.pdf 7/25/2017 Electronic File: C -11B Post Run 07 USR' 10435175.pdf 7/25/2017 Electronic File: C - 11B GR Res_17JUN2017_MD_FINAL_FIELD_B• HI_CTK.cgm 7/25/2017 Electronic File: C- - , 118 118_GR_Res_17JUN2017_TVDSS_FINAL_FIEL D_BHI_CTK.cgm 7/25/2017 Electronic File: C - 1 1B GR RES 17JUN2017_2MD_FINAL_FIELD _BHI_CTK.pdf 7/25/2017 Electronic File: C- 11BGR RES_ 17JUN2017_5TVDSS_FINAL_FI ELD__BHI_CTK.pdf 7/25/2017 Electronic File: C-1 1A Final Survey Report.pdf 7/25/2017 Electronic File: C-11 B Final Surveys.csv Thursday, October 5, 2017 DATA SUBMITTAL COMPLIANCE REPORT 1015/2017 Permit to Drill 2170020 Well Name/No. PRUDHOE BAY UNIT C -11B Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20382-02-00 MD 13432 TVD 9014 Completion Date 7/3/2017 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 28428 Digital Data 7/25/2017 Electronic File: 6-1113 Final Surveys.xlsx ED C 28428 Digital Data 7/25/2017 Electronic File: C-11 B.TXT ' ED C 28428 Digital Data 7/25/2017 Electronic File: C-11 B_ 25_tapescan_BHI _CTK.txt ED C 28428 Digital Data 7/25/2017 Electronic File: C-11 B_ 5_tapescan_BHI _CTK.txt ED C 28428 Digital Data 7/25/2017 Electronic File: C-11B_output.tap ED C 28428 Digital Data 7/25/2017 Electronic File: C- 11B_GR_Res— 17JUN2017_MD_FINAL_FIELD_B- HI_CTK.tif ED C 28428 Digital Data 7/25/2017 Electronic File: C- 11B_GR_ Res_ 17JUN2017_TVDSS_FINAL_FIEL" D_BHI_CTK.tif Log C 28428 Log Header Scans 0 0 2170020 PRUDHOE BAY UNIT C -11B LOG HEADERS ED C 28440 Digital Data 8672 13420 7/27/2017 Electronic Data Set, Filename: C- 11B_MRPM PNC3D_RAW_PASS0IUP_1JUL20 . 17 BHl.las ED C 28440 Digital Data 9474 9851 7/27/2017 Electronic Data Set, Filename: C - 11B MRPM PNC3D RAW PASS02UP 1JUL20 17 BHl.las ED C 28440 Digital Data 7/27/2017 Electronic File: C - 11B MRPM_PNC3D_RAW_PASS01UP_1JUL20 17 BHIAlis ED C 28440 Digital Data 7/27/2017 Electronic File: C- 11B_MRPM PNC3D_RAW_PASS02UP_1JUL20` 17 BHIAlis ED C 28440 Digital Data 7/27/2017 Electronic File: C- 11 B_MRPM_PNC30_RAW_1JUL2017_BH I.meta' ED C 28440 Digital Data 7/27/2017 - Electronic File: C- 11B 11B_MRPM_PNC3D_RAW_iJUL2017_BHl.meta .PDF Log C 28440 Log Header Scans 0 0 2170020 PRUDHOE BAY UNIT C -11B LOG ' HEADERS ED C 28505 Digital Data 9614 -20 8/15/2017 Electronic Data Set, Filename: C- 11B_C1_JEWELRY LOG 3JUL2017_SCH_MEM_PASS_UP_60FPM 023PUC.las AOGCC Page 2 of 5 Thursday, October 5, 2017 DATA SUBMITTAL COMPLIANCE REPORT 10/5/2017 Permit to Drill 2170020 Well Name/No. PRUDHOE BAY UNIT C -11B Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20382-02-00 MD 13432 TVD 9014 Completion Date 7/3/2017 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 28505 Digital Data 13404 10690 8/15/2017 Electronic Data Set, Filename: C- 11B_C1_SCMT_3JUL2017—SCH—MEM MAIN P , ASS_U P_30FPM_2.8751 N_L I N E R_013PUC.las ED C 28505 Digital Data 10485 9636 8/15/2017 Electronic Data Set, Filename: C - 11B C1 SCMT_3JUL2017 SCH_MEM MAIN_P ASS_UP_30FPM_3.51N_LINER_019PUC.las - ED C 28505 Digital Data 10710 10470 8/15/2017 Electronic Data Set, Filename: C- 11B_C1SCMT 3JUL2017 SCH MEM _MAIN _P ASS_UID 30FPM_3251N_LINER_014PUC.Ias ' ED C 28505 Digital Data 13404 10690 8/15/2017 Electronic Data Set, Filename: C- 116_ C1_ SCMT_3JUL2017_SCH _MEM _REPEAT - PASS UP 30FPM 2.8751N LINER 012PUC.la _ _ _ _ _ s ED C 28505 Digital Data 10710 10470 8/15/2017 Electronic Data Set, Filename: C - 11B C1_SCMT 3JUL2017 SCH MEM_REPEAT. —PASS _UP_30FPM_3.251N_LIN ER_015PUC.las ED C 28505 Digital Data 10485 9636 8/15/2017 Electronic Data Set, Filename: C- 11B_C1_SCMT 3JUL2017—SCH—MEM—REPEAT —PASS _UP_30FPM_3.51N_LINER_020PUC.las ' ED C 28505 Digital Data 8/15/2017 Electronic File: C-11B—CI—JEWELRY LOG _3JUL2017_SCH _ MEM _PASS_UP_60FPM _023PUC.DLIS ED C 28505 Digital Data 8/15/2017 Electronic File: C - 11B C1 SCMT 3JUL2017 SCH MEM MAIN P - AS S_U P_30F P M_2.8751 N_L I N E R_013 P UC. D C I S ED C 28505 Digital Data 8/15/2017 Electronic File: C- 11B_C1SCMT_3JUL2017 SCH P . _MEM _MAIN ASS_UP_30FP_M_3.51N_LI NER_019P UC. D LI S ED C 28505 Digital Data 8/15/2017 Electronic File: C- 11B_C1_SCMT_3JUL2017_ SCH_MEM_MAIN_P_ ASS_U P_30FPM_3251 N_LI N E R_014PU C. DLI S ED C 28505 Digital Data 8/15/2017 Electronic File: C - 11B C1_ SCMT_3JUL2017_SCH_MEM_REPEAT _PASS_UP_30FPM_2.8751N_LINER_012PUC.D ' LIS ED C 28505 Digital Data 8/15/2017 Electronic File: C - 11B_ C1_ SCMT_3JUL2017_SCH_MEM_REPEAT _PASS_UP_30FPM_3.251N_LINER _015PUC.DLI - S AOGCC Page 3 of 5 Thursday, October 5, 2017 Comments: AOGCC Page 4 of 5 Thursday, October 5, 2017 DATA SUBMITTAL COMPLIANCE REPORT 10/5/2017 Permit to Drill 2170020 Well Name/No. PRUDHOE BAY UNIT C -11B Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20382-02-00 MD 13432 TVD 9014 Completion Date 7/3/2017 Completion Status 1-0I1 Current Status 1 -OIL UIC No ED C 28505 Digital Data 8/15/2017 Electronic File: C - 11B C1 SCMT 3JUL2017 SCH MEM REPEAT PASS UP 30FPM 3.51N LINER 020PUC.DLI ED C 28505 Digital Data 8/15/2017 Electronic File: C - p 11B_C1_JEWELRY_3JUL2017_SCH_MEM_FIE LD_PRINT.PDF ED C 28505 Digital Data 8/15/2017 Electronic File: C- 11B_C1SCMT_ 3JUL2017_SCH_MEM_FIELD_. PRINT.P_DF Log C 28505 Log Header Scans 0 0 2170020 PRUDHOE BAY UNIT C-1 1B LOG HEADERS Well Cores/Samples Information: - Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED//''''�� Completion Report lV ,�-� Directional / Inclination Data QY Mud Logs, Image Files, Digital Data Y / 1 A Core Chips Y MNPA-�1 Production Test Information 0 NA Mechanical Integrity Test Information Y' N Composite Logs, Image, Data Files © Core Photographs Y /�0vv. 1) Geologic Markers/Tops CYle) NA Daily Operations Summary 0 Cuttings Samples Y / Laboratory Analyses Y /SNA/ COMPLIANCE HISTORY Completion Date: 7/3/2017 Release Date: 2/1/2017 Description Date Comments Comments: AOGCC Page 4 of 5 Thursday, October 5, 2017 DATA SUBMITTAL COMPLIANCE REPORT 10/5/2017 Permit to Drill 2170020 Well Name/No. PRUDHOE BAY UNIT C -11B MD 13432 TVD �^90114' Compliance Reviewed By: / Date 07/3/2017 Operator BP EXPLORATION (ALASKA) INC. API No. 50.029-20382-02.00 Completion Status 1-0I1- Current Status 1-0I1 UIC No Date: 10/ S /� AOG( C Page 5 of 5 1 hursday. October 5. 2017 RECEIVED Originated: Schlumberger AUG 15 2017 PTS - PRINT CENTER 6411 A Street AO G CC Anchorage, AK 99518 (907)273-1700 main (907)273-4760fax Delivered to: �MakanaK Bender Natural Resources Technician 11 Alaska Oil & Gas Conservation Commission '4333WT-Ave, Suite 1p0Anchnrige AK? n! 21 7002 TRANSMITTAL DATE TRANSMITTAL #®' DATA LOGGED tLW201"( M.K.BENDER WELL NAME 09.03A API # SOA29-20209-01 SERVICE ORDER it D69W-00126 FIELD NAME PRUDHOE BAY SERVICE DESCRIPTION DELIVERABLE Memory DESCRIPTION PPROF DATA TYPE FINAL FIELD DATELOGGED 27 -Mar -17 COLOR PRINTS 1 CDs 1 NK -14B 50.029-22668-02 DTBP-00002 NIAKUK WL Cement Eval- USI FINAL FIELD 9 -Apr -17 1 1 11.22A 50-029.22035-01 DOMD-00008 PRUDHOE BAY Memory SCMT FINAL FIELD 3 -May -17 1 1 11-18 50-029.21607-00 DODJ-00051 PRUDHOE BAY WL PPROF Rev3 FINAL FIELD 25 -May -17 1 1 09-05A 50-029-20215-01 DTBP-00015 PRUDHOE BAY WL PPROF Revt FINAL FIELD 13 -Jun -17 1 1 C-118 50.029-20382-02 DOMD-00011 PRUDHOE BAY Memory SCMT FINAL FIELD 3 -Jul -17 1 1 C -07A 50.029-20128-01 DTBP-00020 PRUDHOE BAY WL SCMT Revl FINAL FIELD 5 -Jul -17 1 1 N-27 50-029-23365-00 DODJ-00064 PRUDHOE BAY WL (PROF Rev1 FINAL FIELD 14 -Jul -17 2 1 14-32A 50-029-20999-01 DQUJ-00012 PRUDHOE BAY WL Thrubit FINAL FIELD 25 -Jul -17 1 1 Insmittal Receipt A Transmittal Receipt signature confirms that a package (box, envelope, etc.) has been received and the contents of the X package have been verified to match the media noted above. The nt Name Signature Date specific content of the CDs and/or hardcopy prints may or may ease send signed transmittal to BP via email or post. not have been verified for correctness or quality level at this u�dc@bosom@bn.com point. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIF'" "7N WEL ,OMPLETION OR RECOMPLETION REPIL : AND LOG RECEIVE® AUG 01 7n17 1a. Well Status: Oil ® - Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 25.105 20AAC 25.110 ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One 1b. Weil Clas� /�/-�20AAC ? 11�' QDDevelopmen ®®®"`EEEkkkPlolaW7llGINJ IService❑ Stretigrephic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 7/3/2017. 217-002 ' 3. Address: T. Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99519-0612 6/10/2017 ' 50.029.20382-02-00 - 48. Location of Well (Governmental Section): B. Date TD Reached: 16. Well Name and Number: 6/16/2017 - PBU C-118 ' Surface: 665FNL, 1222' FEL, Sec. 19, T1 1N, R14E, UM 9 Ref Elevations KB 61.83 - 17. Field/Pool(s): Top of Productive Interval: 2750' FNL, 97' FWL, Sec. 20, T1 IN, R14E, UM GL 32.25 BF 33.05 PRUDHOE BAY, PRUDHOE OIL - 10. Plug Back Depth(MD/TVD): 18. Property Designation: I Total Depth: 2060' FNL, 846' FWL, Sec. 20, T11N, RUE, UM • 13413'19014' - ADL 028305 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD7TVD): 19. DNR Approval Number: Surface: x- 664140 - y- 5960549 - Zone - ASP 4 - 13432'/ 9014' - 80-274 TPI: x- 665512 y- 5958494 Zone - ASP 4 12. SSSV Depth (MD/TVD): 20 Thickness of Pernafmst MDr VD: Total Depth: x- 666243 y- 5959200 Zone - ASP 4 None 1900' (Approx.) 5. Directional or Inclination Survey: Yes m (attached) No ❑ Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re -d iloLaterel Top Window MDrrVD: ' 1048619015' ' 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD/GR/RES, GR/CCL/RPM 23' CASING, LINER AND CEMENTING RECORD CASING I WT. PER I FT GRADE SETTING DEPTH MD SETTING DEPTH TVD TOP BOTTOM TOP BOTTOM HOLE SIZEAMOUNT CEMENTING RECORD PULLED 20' x 30' 32' 111' 32' 111' 36" 12.9 ou yds Permafrost Concrete 13-3/8" 72# L40 31' 2667' 31' 2667' 17-1/2" 4301 cu It Arctic Set 9-5/8" 47# L40 29' 8193' 29' 7687' 12-1/4" 1276 ou It Class'G, 130 cu 9 AS 1 7" 26# Lao 2484' 9035' 2484' 8425' 8-1/2" 253 sx Class'G', 438 sx Class'G, 528 sx Class'G' 4-1/2' 12.6# Lao 8867' 10485' 1 8271' 9015' 6-1/8" 270 sx Gass'G' -1/2"x3-1/4" x2 -7/e" 9.3#16.6# 1 /6.5# Lao 9631' 1 13432' 8945' 9014' 4-1/4" 162 sz Class'G' 24. Open to production or injection? Yes ® No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number): GRADE DEPTHSET (MD) PACKER SET (MD/TV 4-1/2" 12.6# L-80 8879' 8823' / 8231' 2" Gun Diameter, 6 spf 12970'-13001' 9016'-9014' COMPLETION 13030'- 13249' 9014'- 9014' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No m Per 20 AAC 25.283 (iH2) attach electronic and printed 13300'- 13362' 9015'- 9014' DAT . information VFRIFIED DEPTH INTERVAL (MDA AMOUNT AND KIND OF MATERIAL USED LL• 2500' Freeze Protect w/ 38 Bbls Diesel 27. PRODUCTION TEST Date First Production: July 26, 2017 Method of Operallon (Flowing, gas lift, etc.): Flowing Date of Test: 7/30/2017 Hours Tested: Production for Oil -Bbl: Gas -MCF: Waley -Bbl: Choke Size: Gas -Oil Ratio: 1 Test Period y 14 12 1 46 872 Flow Tubing 280 Press Casinq Press: 1540 Calculated 24 Hour Rate ---1-329287 Oil-Bbl:.Gas-MCF: Water -Bbl: 13 Oil Gravity- API (cor): WA Form 10407 Revised 512017 CONTINUED ON PAGE 2 Submit ORIGINAL only VTL 9/a o/i 7 - "Ar �so/7 RBDMS I/L- AUG - 1,2017 28. CORE DATA I Conventional Core(s) Yes ❑ No 0 -I Sidewall Cores Yes ❑ No 0 ' If Yes to either question, list formations and intervals coretl (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MID TVD Permafrost - Top Well Tested? Yes ❑ No 0 , Permafrost- Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 12401' 9020' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Zone 1B (Fault) 12401' 9020' Formation at total depth: Zone 1B 12401' 1 9020' 31. List of Attachments: Summary of Daily Uniting Reports, Summary of Post -Rig Work, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N - Contact Name: Leemhuis, Jacob Authorized Title: Info ati and D* ort I r Contact Email: Jacob.Leemhuis@bp.com Authorized Signature: ate: 2)1111-7 Contact Phone: +1907 564 4989 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-004 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted, Item Ia. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item ib. Well Class Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and panted logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cared and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this forth: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Forth 10-407 Revised 5/2017 Submit ORIGINAL Only TREF _ WB-LHEAD= FMC ACTUATOR= 07/05/17 ATOM PBRFS (07103/17) OKE. ­ELB/-- 6128' REF ELEV-- — 61.83' BE R = 33.05' KOP= 8100 hbx Angle = 95' @ 10540' Datum MD= DsWm TVD= 9517 8800'SS 13-3/8" CSG, 72#, L-80, D = 12367" - 2666- 45 KB BKR ONE TRP PATCH, 3290' - 332 D = 2.45' (07/08/17) Minimum ID = 2.313" @ 9645' 2-7/8" X NIPPLE IN PTSA ASSY 9-5/8' CSG, 47#, L-80, D = 8.681" H -8193 .0152 bpf, D= 3.958' I3-1/2' LNR 9.3#, L99 -80 STL, -0087 D", O = 2.2' 41/2' KB P(R YMPSTOCK (06/10/17) 1/2" LNR, 12.6#, L-80, .0152 bpf, D = 3.958' LNR, 6.6#, L-80 TCI 1, .0079 bpf, D = 2.85' PERFORATION SUMMARY REF LOG: BKR MIND ON 06/17/17 ANGLEAT TOP PERF: 93' @ 12970' Note: Refer to Production DB for historical o 2" I 6 1 13030 - 132491 O 2' 6 13300 - 13362 O PBTD = 2.441" SAI NOTES: 81V1'ELL ANGLE> 70° 9752'. MAX C -11 B DLS: 25.4° 2206' 4-1/2'FES X NP, D=3.813' 2484' 9-5/B'X7"BKRZXPLTPw MGR.D=6.300' 2694' s -5/a" DV PK7R GAS LFT MANDRB-S `STA #4 = COVERED BY BKR PATCH 8061' 9-5/8"X7-BKR ZXP LTPw/HGR. D=6.260' MLLOUT V0dlOV/ 8193' - 8209' 4FGYN ��4-1/2-FESX NPD=3.613- ICCJNAL COMPLETION 03/28180 ORM 07/05/17 ATOM PBRFS (07103/17) 8867' ST AD TVD DEV TYPE VLV LATCH PORT DATE '4 3297 3297 0 KBG-2 DOME BK 16 01/03(12 3 5671 5529 29 KBG-2 DOM- BK 20 06!26117 2 7467 7086 32 KBG-2 DMY BK 0 04/20/03 1 8734 8150 25 KBG-2 DMY BK 0 04/20/03 `STA #4 = COVERED BY BKR PATCH 8061' 9-5/8"X7-BKR ZXP LTPw/HGR. D=6.260' MLLOUT V0dlOV/ 8193' - 8209' 4FGYN ��4-1/2-FESX NPD=3.613- ICCJNAL COMPLETION 03/28180 ORM 07/05/17 ATOM PBRFS (07103/17) 8867' 4-1/2' HES XN NP MILLED TO 3.80' (03/2 8874' 07/17/17 BTNJ SET PATCH (07/08117) 7-X5"BKR ZXP LTPw/HGR, ID=4.390" 8879' 4-1/2" WLM, ID= 3.95W 79M 964-3.70' DEPLOY SLV, ID=3.OD" 9646' 2-718' X NP, D = 2313" 9667' 3-112" 0TIS X NP, D = 2.812' 10479' 3-1/2" X 3-3/16" XO, ID:-: 2786- I MILLOUT WNDOW (C-118) 10485' - 10493' 1 107 3-3/16' X 2-718' XO_ ID = 2.377' JT w IRA DATE REV BY C0MV8dTS DATE REV BY COMMENTS ICCJNAL COMPLETION 03/28180 ORM 07/05/17 ATOM PBRFS (07103/17) 04/21/03 DAVIM RIGSIDETRACK(C-11A) 07/17/17 ZV/JkU SETLTPw/NSPISA(07107117) 06119117 N-COR2 CTD(C-11B) 07/17/17 BTNJ SET PATCH (07/08117) 06121117 JIMU fRG HO CORRECTIONS 07119117 DG(A U CORRECTION TO LTP 06/26/17 JUJMD RNAL ODEAPPROVAL 07/31117 JN IJM) ADDS) OKB, REF & BF E LB( 07/05117 JPKIJMD GLV 00 (06/26/17) PRUDHOE BAY LINT WELL: C -11B PEFUT No: 217-002 AR No: 50.029-20382-02 SEC 19, T11 N, R14F 669 FN- & 1222' FEF BP Exploration (Alaska) North America - ALASKA - BP Page 1 of 16 Operation Summary Report Common Well Name: C-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/7/2017 End Date: 6/17/2017 X3 -018C2 -C: (2,849,198.00) Project: Prudhoe Bey Site: PB C Pad Rig Nama/No.: CDR -2 Spud Date/Time: 8/11/1979 12:00:OOAM Rig Release: 6/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000638 Active datum: KB @61.83us8 (above Mean Sea Level) Date From -To Him Task Code NPT Total Depth Phase Description of Operations ma c�em 6!//2017 03:00 - 07:30 4.50 MOB P PRE RIG RELEASE FROM D-33 AT 0300 HRS ON i 6/7/2017 - CONTINUE WITH RIGGING DOWN FROM MOB P D-33 PRE PJSM FOR MOVING OFF OF WELL D-33 07:30 - 08:00 0.50 INCLUDES: - 12"X12" BLOCK IS IN PLACE ON MATS IN FRONT OF WELL TO PREVENT RIG ROLLING TOWARDSTREE - RADIOSARE FUNCTION TESTEDAND VERBALCOMMAND OF"STOP"IS 'UNDERSTOOD - HAND SIGNAL FOR "STOP" HAS BEEN DISCUSSED, 4' RULE FOR PROXIMITY TO FIXED OBJECTS IN PLAY 08:00 - 10:00 2.00 MOB N WAIT PRE MOVE MODULES OFF OF D-33 WITH NO ISSUES. STAGE MODULES ON D -PAD WHILE TOOL SERVICE CREW PLACES MATS ON PLANNED ROUTE. UNEXPECTED SOIL HAD BEEN LAID IN OVERNIGHT ON ROUTE WITHOUT ANYONE'S KNOWLEDGE. ROAD TOO SOFT TO MOVE SO MATS HAD TO BE LAID. 10:00 - 11:00 1.00 MOB P PRE MOVE MODULES TO C.PAD, STAGE MODULES ON PAD 11:00 - 12:30 1.50 MOB P PRE INSPECT TREE: IAAND OAAT 0 PSI, TREE VALVES CLOSED IN, MATTING GOOD, PLACE 12"X12"X20' BLOCK IN FRONT OF TREE. CONDUCT PRE -JOB SAFETY MEETING TO DISCUSS MOVE OVER WELLAND STOP POINTS, DISCUSS SAME VISUALAND AUDIBLE COMMANDS OF "STOP". 12:30 - 15:00 2.50 MOB P PRE MOVE SUB MODULE IN PLACE OVER WELL - MOVE PITS MODULE AND COUPLE WITH SUB MODULE. RIG ACCEPT 1500 HRS. 15:00 - 00:00 9.00 RIGU P PRE PREPARE FOR OPERATIONS - PLACE SENSORS ON TREE, CYCLE VALVES PER WELL PLAN CRITERIA - PREP LOCATION, STAGE SUPPORT EQUIPMENT - LEAK TIGHT TEST ON TREE CAP, NO VISIBLE LEAKS OR PRESSURE LOSS AT TREE -AOGCC REP MATTHEW HERRERA WAIVED WITNESS AT 20:18 - GREASE STACKAND CHOKE MANIFOLD. - NIPPLE UP ROPE. PERFORM PRE -SPUD WITH JURY'S CREW. 6/8/2017 00:00 - 03:00 3.00 RIGU P PRE COMPLETE NIPPLE UP OF BORE. ANNULAR, BLIND/SHEAR, 2-3/8" PIPE/ SLIPS, MUD X, 3' PIPE /SLIPS, 2-3/8" x 3-1/2" VARIABLES, MUD X, BLIND / SHEAR, 2-3/8" PIPE / SLIPS Printed 8/1/2017 10'22:37AM 'All depths reported in Drillers Depths' Printed 8/1/2017 10:22:37AM *AAI depths reported in Drillers Depths' North America - ALASKA - BP Page 2 of is Operation Summary Report Common Well Name: C-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: eO12017 End Date: 6/17/2017 X3-01BC2-C: (2,849,198.00) Project: Prudhoe BayI Site: PB C Pad Rig Name/No.: CDR -2 Spud Date/Time: 8/11/1979 12:00:OOAM Rig Release: 6/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI. USA00000638 Active datum: KB @61.83uafl (above Mean Sea Level Date From -To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usR) 03:00 - 07:00 4.00 BOPSUR P PRE CONDUCT BODY TEST, UPPER SWABAND MASTER NOT HOLDING PRESSURE. ATTEMPT TO TESTAGAINST TWO, WOULD NOT HOLD ON INITIAL TEST. BLEED PRESSURE, RE -ATTEMPT AND PRESSURE HELD. -TEST WITNESS WAIVED BY AOGCC REP MATTHERRERA - DISCUSSED CLOSE APPROACH/ INTERSECTION CONTINGENCIES WITH C -PAD OPERATOR. CONFIRMED THAT C-30 IS _ _ PRE CLOSED IN. TEST BORE TO 250 PSI LOW, 3500 PSI HIGH 07:00 - 17:00 10.00 BOPSUR P FOR 5 MINUTES EACH '- CONDUCT RAM LOCK TESTS IN CONJUNCTION WITH BOP RAM TESTS - TEST ALL AUDIBLE AND VISUALALARMS, ALL GOOD 17:00 - 20:30 3.50 BOPSUR P PRE CONTINUE WITH FIX SOMBRARO / REPLACE O -RINGS ON LOWER PORTION OF PDCS - FLUID PACK COIL. TEST INNER REEL VALVE i/PACKOFFS 20:30 - 00:00 3.50 BOPSUR P PRE PERFORM 250 PSI / 3500 PSI - VALVE CREW TEST TORQUE ON TREE/ SERVICE TREE VALVES - TEST BACKWARDS ON C9 & C10 - RETEST TOP SWAB VALVE - TEST OFF DRILLERS PDL TO 250 LOW/ 3500 HIGH. GOOD TEST - DRAIN / STOW OFF DRILLER SIDE PDL. - TEST DRILLERS PDL TO 250 LOW 13500 00:00 - 04:00 4.00 CLEAN P PRE HIGH. GOODTEST INSTALL AND TEST FLOATS. 8/9/2017 PU AND MAKE UP TO PULL TWC. PURGE STACK WITH METHANOL PT LUBRICATOR TO250 LOW/ 3500 PSI HIGH LATCH AND PULL TWO. WELLONVACUUM PERFORM LTT TEST BETWEEN MASTER AND BOTH SWABS GOOD TEST. VERIFIED WE RETRIEVED TWO. 04:00 - 08:45 2.75 CLEAN P PRE OFFLOAD VALVE CREW EQUIPMENT. CLEAR AND CLEAN RIG FLOOR - LINE UP FLUIDS, VERIFY FLOW BACK TANK BLOWN DOWN. - MU NOZZLEAND STAB ON, DISPLACE COIL FROM FRESH WATER TO KCL. WELL ISOLATION WITH 2 CLOSED SWABS AND MASTER. - PJSM ON BULLHEAD KILL. OPEN MASTER, CONFIRM VALVE ALIGNMENT. Printed 8/1/2017 10:22:37AM *AAI depths reported in Drillers Depths' North America -ALASKA- BP Operation Summary Report Common Well Name: C-11 Event Type: RE-ENTER- ONSHORE (RON) i Start Date: 60/2017 End Date: 6/17/2017 AFE No (2,849,198.00) Project: Prudhoe day Sita: PB C Pad Rig Name/No.: CDR -2 Spud Date/Time: 8/11/1979 12:00:OOAM Rig Release: 6/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00DO0638 Active datum: KB @61.83usR (above Mean Sea Level) Date From -To Him I Task Code I NPT Total Depth I Phase Description of Opera9ons Page 3 of 16 BULLHEAD KILL WELL WITH 120° 8.4 PPG 1% KCLAT 4.1 BPM, 415 PSI INITIAL CIRC PRESSURE. - IAAT 160 PSI, OA 0 PSI WITH 60 BBLS AWAY - IA 825 PSI WITH 100 BELS AWAY AT 4.0 BPM - IA AT 1145 PSI WITH 200 BBLS AWAY AT 4.0 - IAAT 1300 PSI WITH 250 BBLS AWAY - CHASE KCL WITH 8.5 PPG HI -VIS MUD PILL FOLLOWED BY 8.5 PPG MUD SYSTEM. PUMP DOWN AT 4.0 BPM, 1820 PSI AND SPOT HI -VIS PILL INTO PERFORATIONS. DOWN ON PUMPS, SLOW PRESSURE LOSS AS FLUID SETTLES INTO PERF ZONE. IA PRESSURE FELL OFF TO 426 PSI WITH PUMPS OFF AND FLUID SETTLING IN. 108:45 - 09:45 1.00 BOPSUR P PRE CONFIRM LINE-UP TO TIGER TANK WITH ISOLATION TO WELL WITH CLOSED IN SWAB VALVES. DISPLACE COIL TO MUD SYSTEM, FLUID PACKING LUBRICATOR WITH 8.5 PPG MUD, MONITOR PRESSURE ON MPD LINE (USED FOR KILL) AND FORMATION IS ON VERY SLIGHT LOSSES. - BRING ON PUMPS TO HAVE 200 PSI OVER PRESSURE BELOW SWABS (FORMATION PRESSURE). OPEN UP TO WELL WITH TESTED INJECTOR, CIRCULATE AT.5 BPM AND ESTABLISH ALMOST ONE-TO-ONE RETURNS. FLOW CHECK GOOD WITH NO FLOW, VERY SLIGHT LOSS. 0945 - 1130 1 75 CLEAN P WEXIT PJSM FOR MAKING UP 3.80" CLEANOUT MILLING BHA #1 POP OFF WITH INJECTOR, BREAK OFF NOZZLE AND STINGER ASSEMBLY - MAKE UP 3.80" MILL / STRING REAMER / MOTOR ASSEMBLY TO BHI COI LTRAK TOOLS WITH GAMMA RAY. BOTH D-331 AND STRING MILLAT 3.80" GO, 3.79" NO-GO. - STAB ON, PRESSURE TEST QUICK TEST SUB - SERVICE REVERSE CIRCULATING VALVES WHILE MAKING UP BHA, TESTING QTS - BREAK CIRCULATION, WELL TOOK 5.12 BBLS FOR AVERAGE LOSS OF 3 BPH WHILE I AT SURFACE WITH NO PUMPS ON 11:30 - 13'.00 1.50 CLEAN P WEXIT RIH TO 8700' - LOSING -30 BPH WHILE RIH AND CIRCULATINGAT 1.25 BPM, 1000-1200 PSI - MW IN 8.52 PPG, MW OUT 8.47 PPG, IAAT _ 410 PSI, OAAT O PSI _ 1300 - 1515 225 CLEAN P WEXIT LOG TIE-IN FOR GEO PDC WITH -9.5' CORRECTION - PICK UP AND LOG CCL FOR CORRELATION TO TUBING SUMMARY. LOG SHOWS JEWELRYAND MARKER JOINT VARIANCE BY -2-3' FOR EACH COMPONENT, PRETTY MUCH _ ON DEPTH WITH HANDOVER SUMMARIES. r15:15 - 15:45 0.50 CLEAN P WEXIT RIH WITH CLEANOUT BHA - SLACK OFF WEIGHT MOVING DOWN HOLE 23-25K; PICKUP WEIGHT 42-43K - DRY DRIFT WITH 3.80" MILL ON TRIP DOWN FROM 94OU TO 10,168'; SET DOWN WITH 3.BK Printed 8/1/2017 10:22:37AM *All depths reported in Drillers Depths' Printed 8/1/2017 10:22:37AM `All depths reported in Drillers Depthi North America - ALASKA - BP Page 4 of 16 Operation Summary Report Common Well Name: C-11 ARE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/7/2017 End Date: 6/17/2017 X3 -018C2 -C: (2,849,198.00) Project: Prudhoe BayI Site: PB C Pad Rig NameRJo.: CDR -2 I Spud DateRme: 8/11/1979 12:00:OOAM Rig Release: 6/19/2017 Rig Cont2otoc NABORS ALASKA DRILLING INC. BPUOI: USA00000638 Active datum: KB @61.83usft (above _ Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) { (usft) 15:45 - 18:30 2.75 CLEAN P WEXIT PICK UP, CLOSE EDC, BEGIN CLEANOUT MILLING RUN AT 2.5 BPM, 2290 PSI FREE SPIN - IAAT 445 PSI - DURING PTM, PERFORMED PRESPUD WITH WARDSCREW. - CLEAN UP SECTION FROM 10,168 -10,186 - WITH SLIGHT MOTORWORK OF 40-50 PSI - PICK BACK UP, DRY DRIFT THROUGH WITHOUT ISSUE. COME BACK ON WITH PUMPS TO 2.5 BPM, WORK DOWN WITHOUT ANY DIFFICULTY TO 1Q40O, SOW 24K. PICK BACK UP WITH NO ISSUES, PUW 43K. WORK DOWN AGAIN WITH MILLAT 2.53 BPM, 2330 PSI TO 10505'. WITHOUT ISSUE. - LOSING AVERAGE OF 27 BPH DURING _ WEXIT CLEANOUT OPERATION DRY DRIFTED ACROSS AREA TO BOTTOM, 18:30 - 20:10 1.67 CLEAN P PUMPED 10 BBL HIVIS SWEEP. PULL UP TO 9209. LOG CCL FOR BOTH LINER TOP AND WHIPSTOCK. COLLAR WEXIT LOCATIONS MONITOR WELL FOR 10 MINUTES: STATIC 20:10 - 20:30 0.33 CLEAN P WEXIT - MUD WEIGHT: 8.57 PPG IN, 8.47 PPG OUT POH FROM 10500' MD TO 200'1 20:30 - 22:30 2.00 CLEAN P - MUD WEIGHT: 6.56 PPG IN, 8.46 PPG OUT - RATE: 2.90 BPM IN, 2.19 BPM OUT, CIRC PRESSURE: 2087 PSI '- IA PRESSURE: 431 PSI, OA PRESSURE:0 PSI 22:30 - 00:00 1.50 CLEAN P WEXIT MONITOR WELL FOR 10 MINUTESAT BHA: STATIC -LAYDOWNBHA. GAUGE MILL AND STRING ! REAMER. 3.80"GO/3.79"NOGG - INJECTOR OFF: 22:45 -PJSM, MAKEUP WHIPSTOCK BHA 6/10/201700:00 - 00:45 0.75 STWHIP P WEXIT MAKE UP WHIPSTOCK SETTING BHA#2 -SURFACE TESTED TOOL. GOOD TEST. - PRESSURE TEST OTS TO 250 PSI LOW FOR S MINUTES / 3500 PSI HIGH FOR 5 MINUTES 0045 - 03'.30 2.75 STWHIP P WEXIT -INJECTOR ON: 0045 RIH WITH WHIPSTOCK SETTING BHA #2 - RATE: 0.31 BPM IN, 0.74 BPM OUT. CIRC PRESSURE: 923 PSI OPEN EDC, TRIPS - MUD WEIGHT: 8.53 PPG IN, 8.49 PPG OUT - LOG DOWN FOR TIE-IN FROM 9170' TO 9217.75' MD (FORMATION) WITH -8' CORRECTION - CONTINUE IN HOLE SET DEPTH. PU WEIGHT 48K 03:30 - 04:05 0.58 STWHIP P WEXIT - 110500 67 (10485' TOWS) SET WHIPSTOCK - CLOSE EDC. PRESSURE UP TO 3700 PSI AND RELEASE FROM WHIPSTOCK - TOWS: 10485' MD - BOWS: 10500.67' MD - SET 45 DEG ROHS - CONFIRM SET WITH 4.2K DOWN WEIGHT Printed 8/1/2017 10:22:37AM `All depths reported in Drillers Depthi North America - ALASKA - BP Page 5 of 16 Operation Summary Report Common Well Name: C-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 6!/12017 End Date: 6/17/2017 X3-018C2-C: (2,849,198.00) Protect: Practice Bay Site: PB C Pad Rig Name/Na: CDR-2 Spud DateRme: 8/11/1979 12:00:OOAM Rig Release: 6/19/2017 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000638 Active datum: KB Q61.63usft (alb v Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) I (usft) 04:05 - 07:15 3.17 STWHIP P WEXIT _ MONITOR WELL FOR 10 MINUTES: STATIC - MUD WEIGHT: 8.56 PPG IN, 8.47 PPG OUT RATE: 1.40 BPM IN, 0.94 BPM OUT - POH FROM 10500' MD TO 200' MD - FLOW CHECK WELL WITH BHA BELOW BOP. FLOW CHECK GOOD, WELL ON VACUUM. - PULL BHA INTO BOP AND TAG UP - POP OFF WITH INJECTOR AT 0715 07:15 - 08:30 1.25 STWHIP P WEXIT LAY DOWN WHIPSTOCK BHA - MAKE UP 3.80" MILLING BHA #3. MILLS GAUGE 3.80" GO, 3.79" NO-GO. MU TO I COILTRAK TOOLS. - STAB ON WITH INJECTOR AT 0830 08:30 - 11:00 2.50 STWHIP P WEXIT POWER ON TOOLS AND FUNCTION WHILE QTS IS PRESSURE TESTED - RIH WITH 3.80" MILLING BHA - INITIAL IAAT 190 PSI, MW IN 8.5 PPG. BREAK CIRCULATION, 4 BELS LOSSES WHILE AT SURFACE - RIH AT .35 BPM IN, CIRC PRESSURE OF 715 PSI, IA INCREASED TO 250 PSI - LOG TIE-IN TO FORMATION WITH -9' CORRECTION - RECORD PARAMETERS BEFORE MILLING: PICKUP WEIGHT44K, SLICK OFF WEIGHT 25K AT 10,400' - RIH, ENGAGE WHIPSTOCK AT 10,486. PICK UP, ON WITH PUMPS AND RE-ENGAGE AT 10,485' 11:00 - 17:15 6.25 STWHIP P WEXIT BEGIN MILLING OPERATIONS - CIRCULATION RATE OF 2.64 BPM, CIRC PRESSURE 2400 PSI (FREE SPIN) - IA 465 PSI, OA 0 PSI, LOSS RATE AT 2.64 BPM OF -12 BPH, MW IN 8.52 PPG, MW OUT 8.49 PPG - FOLLOW WELL PLAN FOR FIRST FOOT OF MILLING. INCREASE WOB TO 1.7-2.eK AT 2.65 BPM, 2550 PSI TO MILLAHEAD. - MW IN 8.53 PPG, MW OUT 8.49 PPG, ECD OF 9.66 PPG, LOSS RATE FAIRLY CONSISTENTAT 6-7 BPH DURING MILLING - NOSE OUT WITH MILLAT 3.6' IN TO MILLING, SLIGHT FALL OFF IN DIFFERENTIAL BUT WOB FELL FROM AS HIGH AS 2.8 TO .7-1.BK - MILLING WITH WINDOW MILL NOSED OUT HAS INCREASED IN SPEED FROM 1 FPH TO 1.2 FPH WITH LITTLE RESISTANCE- WOB DROPPED OFF TO AS LOW AS 120 LBS WITH BHA AT MIDPOINT AND STRING REAMER ACROSS WINDOW. HAVING BOT REP MAINTAIN CONSISTENT WOB WITH GOAL OF USING THE .e• BEND OF THE MOTOR TO GAIN SEPARATION. - DISCUSS AMONGST TEAM, TWO POSSIBILITIES: WHIPSTOCK FELL AWAY OR LITTLE OR NO RESISTANCE FROM CASING / FORMATION DUE TO SET IN PERF ZONE. Printed 8/1/2017 10.22.37AM •A8 depths reported in Drillers Depths` North America - ALASKA - BP Page 6 of 16 Operation Summary Report Common Well Name: C-11 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date: 6!7/2017 End Date: 6/17/2017 X3-018C2-C: (2,849,198.00) Project: Prudhoe Bay I Site: PB C Pad Rig Name/No.: CDR-2 Spud Date"hme: 8/11/1979 12:00:00AM Rig Release: 6/19/2017 Rig Contracts: NABORS ALASKA DRILLING INC. BPUOI: USA00000638 Active datum: KB @61.83us8 (above_ Mean Sea Level) Date From-To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usR) 17:15 - 17:30 0.25 STWHIP P WEXIT PICK UP OFF WHIPSTOCK PUW OF 45 K PICK UP HOLE, DOWN ON PUMPS AND MOVE DOWN. SLACK OFF WEIGHT OF 23-24K. BOTH ARE IN RANGE OF ORIGINAL PARAMETERS. - MOVE DOWN, BHA TOOK WEIGHTAT WHIPSTOCK DEPTH. SET DOWN 2.3K. WEXIT CONTINUE IN HOLE, NO REAL WOB AFTER 1730 - 2030 3.00 STWHIP P MIDPOINT. TIME MILL TO END OF TRAY. GEO CALLED SAMPLES ALL FORMATION I DRILL RATHOLE TO 10507' PUMP 10 BBLS SWEEP. MAKE TWO REAMING PASSES, SAWALITTLE MOTOR WORK ON FIRST PASS. DRY DRIFT WINDOW. NO ISSUES 20:30 - 22:30 2.00 STWHIP P WEXIT MONITOR WELL FOR 10 MINUTES: STATIC - MUD WEIGHT: 8.56 PPO IN, 8.51 PPG OUT - RATE: 2.71 BPM IN, 2.22 BPM OUT WEXIT MONITOR WELL FOR 10 MINUTESAT BHA: 22:30 - 00:00 1.50 STWHIP P STATIC -POWER DOWN - INJECTOR OFF: 22:50 - 3.80" GO / 3.79" NOGO ON BOTH WINDOW MILLAND STRING REAMER 6/11/2017 00:00 - 01:20 1.33 DRILL P PRODi MAKE UP 4.25" DRILLING BHA #4 - PICK UP 2-718' M1 XLS MOTOR (0.94 DEG AKO) AND 3.0" COILTRAK TOOLS - MAKE UP 3.75" X 4-1/4" HCC BI-CENTER BIT �- SURFACE TESTED TOOL. GOOD TEST. - PRESSURE TEST OTS TO 250 PSI LOW FOR 5 MINUTES 13500 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 01:20 PERFORMED MOCK RUN FOR UNDEPLOY SPACE OUT 01:20 - 04:15 2.92 DRILL P PROD1 RIR WITH 4.25"DRILLINGBHA#4 - RATE: 0.29 BPM IN, 0.77 BPM OUT. CIRC PRESSURE: 1039 PSI - MUD WEIGHT: 8.55 PPG IN, 8.53 PPG OUT - LOG DOWN FOR TIE-IN FROM 10410' TO 10454.64' MD (FORMATION) WITH -14' CORRECTION - CLOSE EDC. PU WEIGHT48K RIH WEIGHT 25K _ - ORIENT FOR WINDOW 4.50 DRILL P��PROW DRILL 4.25" LATERAL FROM 10507'MD 04:15 - 08:45 - FREE SPIN: 2986 PSI, 2.83 BPM - RATE: 2.81-2.83 BPM IN, 2.66-2.75 BPM OUT. CIRC PRESSURE: 2966-3900 PSI - MUD WEIGHT: 8.60 PPG IN, 8.56 PPG OUT, ECO: 9.90 PPG WITHOUT BACKPRESSURE, DRILLING MAINTAINING 11.1 PPG INFLUENCED ECD - ROP: DRILLING EXCEPTIONALLY FAST AT 160-225 FT/HR, WOB:.5—1.7KLBS. - LOSSES AVERAGING 3-8 BPH Pnnted 6/1/2017 10:22:37AM *AII depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Common Well Name: C-11 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/7/2017 End Date: 6/17/2017 Project PrudhoeBaySite: PB C Pad Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: KB @61.83us8 (above Mean Sea Level) Date From - To Him I Task Code I NPT Total Depth I Phase 1015 - 1500 4.75 DRILL PP Page 7 of 16 AFE No Q -018C2 -C: (2,849,198.00 ) Rig Release: Description of Operations CLEANING, GEO TIE-IN FOR PDC LOG - CLEAN PICKUP, PUW 4142K - WIPER AT 2.90 BPM IN, 2.65 BPM 0UT, 3680-3850 PSI, MAINTAINING 11.1 PPG ECD WITH 8.58 PPG MW - SHORT INTERVAL OF SK OVERPULL WHEN PULLING THROUGH WINDOW. ATTRIBUTE IT TO CUTTINGS, NO WINDOW INTEGRITY. OPEN EDC, FLUSH ACROSS WHIPSTOCK TRAY. - INITIAL CIRCULATION IS BRINGING UP -30% INCREASE IN CUTTINGS THATARE VERY DRY BUT NOT STICKY. INITIAL OUT DENSITY ROSE TO 8.78 PPG. CIRC PRESSURES ARE DROPPING AS THE CUTTINGS ARE MOVED UP HOLE, OUT DENSITY HAS DROPPED TO 8.63 PPG APPROXIMATELY HALFWAY THROUGH CIRCULATION AT 4.0 BPM, 3680 PSI. - LOGGING PDC TIE-IN FOR GEO DURING THIS CIRCULATION - RETURNS HAVE BECOME WETAND STEADY NOW, REDUCED BACK DOWN TO NORMAL EXPECTATION FOR RETURNS ACROSS 'iSHAKER. LOST 20 BBLS DURING THIS HIGHER PUMPING RATE. - SLACK OFF WEIGHT IN CASED HOLE 22K -MOVE THROUGH WINDOW WITH NO ISSUES OR WEIGHT BOBBLES -CONTINUE LOGGING DOWN FOR PRIMARY TIE-IN. SOW IN OPEN HOLE 20K. - LOG COMPLETE, CONTINUE RIH TO TD OF PROD1 DRILL 4.25' LATERAL FROM 10,956'MD - FREE SPIN: 3520 PSI, 2.80 BPM - RATE: 2.75 BPM IN, 2.74 BPM OUT. CIRC PRESSURE: 3650-4100 PSI - MUD WEIGHT: 8.60 PPG IN, 8.66 PPG OUT, ECD: 9.90 PPG WITHOUT BACKPRESSURE, DRILLING MAINTAINING 11.1 PPG INFLUENCED ECD - DRILLING EXCEPTIONALLY FAST FOR MOST OF THIS SECTION AT 160275 FT/HR, W08:.5 - 1.8KLBS. ONE SHORT SECTION IT SLOWED TO 4060 FPH, CORRESPONDED TO POSSIBLE SHALE INTERVAL. - LOSSES AVERAGING 6-8 BPH Printed 8/1/2017 10:22:37AM *All depths reported in Drillers Depths" North America - ALASKA - BP Page 8 of 16 Operation Summary Report Commn Well Name: C-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6!7/2017 End Date: 6/17/2017 X3 -018C2 -C: (2,849,198.00) I Hlg NaMINo.: CUN-2 Spud DateRme: 8/11/1979 12:00:OOAM Rig Release: 6/19/2017 Active datum: KB @61.83usR (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) MR) PRODI 15:00 - 16:45 1.75 DRILL P WIPER TRIP TO WINDOW FOR HOLE CLEANING - HEAVY PICK UP TO 48K, CLEAN ONCE MOVING UP HOLE WITH PUW OF 41-42K ON TRIP TO WINDOW - MAINTAIN 11.1 PPG ECD WITH 8.60 PPG MW - NO ISSUES WHEN PULLING THROUGH WINDOW. OPEN EDC, FLUSH ACROSS WHIPSTOCKTRAY. PULL INTO WINDOW AND 23:20 - 00:00 0.67 DRILL P CONTINUE TO CIRCULATE AT 3.85 BPM, 3560 PROD1 PJSM. DISCUSS UNDEPLOY CHECKLIST. PSI. INITIAL RETURNS HEAVY AT 8.75 PPG, START UNDEPLOYMENT CHECKLIST DROPPED OFF WITH BOTTOMS UP. MAINTAIN 11.0 PPG EQUIVALENTAT WINDOW 6/12/2017 00:00 - PICK UP WEIGHT IN CASED HOLE 43K, 5.50 DRILL P PROD1 CONTINUE WITH UNDEPLOYMENT SLACK OFF WEIGHT IN CASED HOLE 22K PROCEDURE - MOVE DOWN THROUGH WINDOW WITH NO LAY DOWN BHA. ISSUES OR WEIGHT BOBBLES PJSM FOR DEPLOYING BHA ON A LIVE WELL. - RUN TO BOTTOM SPACEOUTWITHPDL FOLLOW CHECKLIST. 16:45 - 19:40 _ 2.82 DRILL P PRODI DRILL 4.25' LATERAL FROM 11,407' MD - FREE SPIN: 3645 PSI, 2.80 BPM - PRESSURE TEST LUBRICATOR - RATE: 2.78 BPM IN, 2.68 BPM OUT. CIRC PRESSURE: 3880-3915 PSI - MUD WEIGHT: 8.64 PPG IN, 8.72 PPG OUT, DRILLING MAINTAINING 11.1 PPG INFLUENCED ECD FUNCTION TEST. 2.50 -ROP: DRILLING FASTAT 80-180 FPH, WOB: P 05:30 - 0800 1.0-1.9KLBS. RIHWITH BHA. SHALLOW TEST AGITATOR AT - LOSSES AVERAGING 6-8 BPH - DIRECTIONAL HAVING HARDTIME WITH 1 000'AT 2.5 BPM, GOOD TEST WITH POSITIVE LEFT HAND TURN. DISCUSSION WITH ETL AND ODE. DECISION TO POOH FOR BHA _ 3.67 DRILL P I T PROD1 MONITOR WELL WITH A MPD DYNAMIC FLOW 19:40 - 23:20 VIBRATIONS. I CHECK AFTER 10 MINUTES LOSING 4 BPH - MUD WEIGHT: 8.69 PPG IN, 8.67 PPG OUT - RATE: 3.0 BPM IN, 2.72 BPM OUT - WIPER TO WINDOW. JOG IN THE HOLE PRIOR TO PULLING THROUGH WINDOW. - PULL THROUGH WINDOW WITH NO ISSUE. OPEN EDC/ JETTRAY. OPEN EDC, POH FROM 10450' MD TO 200' MD - RATE: 3.02 BPM. CIRC PRESSURE: 2945 PSI - PERFORM JOG AT 1500' TO FLUSH CUTTINGS. - PULL UP TO 200' 23:20 - 00:00 0.67 DRILL P PROD1 PJSM. DISCUSS UNDEPLOY CHECKLIST. START UNDEPLOYMENT CHECKLIST MAINTAIN 11.0 PPG EQUIVALENTAT WINDOW 6/12/2017 00:00 - 05:30 5.50 DRILL P PROD1 CONTINUE WITH UNDEPLOYMENT PROCEDURE LAY DOWN BHA. PJSM FOR DEPLOYING BHA ON A LIVE WELL. SPACEOUTWITHPDL FOLLOW CHECKLIST. - PRESSURE TEST LUBRICATOR COMPONENTS. POWER UP TOOLS, FUNCTION TEST. 2.50 DRILL P 05:30 - 0800 PROD1 RIHWITH BHA. SHALLOW TEST AGITATOR AT 1 000'AT 2.5 BPM, GOOD TEST WITH POSITIVE VIBRATIONS. - RIH WTH BHA #5 Printed 8/1/2017 10,22:37AM *All depths reported in Drillers Depths' North America - ALASKA - BP Page 9 of 16 Operation Summary Report Common Well Name: C-11 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 6/7/2017 End Date: 6/17/2017 X3 -018C2 -C:(2,849,198.00) Project Prudhoe Bay I Site: PB C Pao Rig Name/No.: CDR -2 Spud DateTme: 8/11/1979 12:00:00AM Rig Release -, 6/192017 Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: 0000638 Active datum: KB @61.83usft (above Mean Sea Level) Data From - To Hrs Task Code NPT Total Depth Phase Description of Operations _ (hr) (usft) 06:00 - 09:30 1.50 DRILL P PROD1 DRILL 4.25" LATERAL FROM 11,561' MD '- FREE SPIN: 4065 PSI, 2.71 BPM WITH AGITATOR IN BHA - RATE: 2.81-2.83 BPM IN, 2.66-2.75 BPM OUT. CIRC PRESSURE: 2966-3900 PSI - MUD WEIGHT: 8.60 PPG IN, 8.56 PPG OUT, ECD: 9.90 PPG WITHOUT BACKPRESSURE, DRILLING MAINTAINING 11.1 PPG INFLUENCED ECD - ROP: 160225 FPH, WOB: .5 — I.7KLBS. - LOSSES AVERAGING 3-5 BPH - CANNOT MOVE PIPE ONATTEMPTED 09:30 - 12:15 275 DRILL PICKUP. N DPRB 11,629.00 PROD1 ATTEMPT TO WORKFREE, NO-GO. ABLE TO OREINT, HAVE FULL CIRCULATION RETURNS. WOB SENSOR AT PERFORMANCE SUB INDICATES DIFFERENTIALLY STUCKAT BHA. - PUMP MINERAL OIL PER PLAN, FREEAS MINERAL OIL CAME AROUND BIT WITH BHA IN TENSION - RECIPROCATE PIPE, CIRCULATE MINERAL OILAND SPACER PILLS OUT 12:15 - 15:30 3.25 _ DRILL P PROD? DRILL 4.25' LATERAL FROM 11,629' MD - FREE SPIN: 3870 PSI, 2.74 BPM - RATE: 2.72 BPM IN, 2.69 BPM OUT. CIRC PRESSURE: 4200-4275 PSI - MUD WEIGHT: 8.66 PPG IN, 8.84 PPG OUT, ECD: 9.90 PPG WITHOUT BACKPRESSURE, DRILLING MAINTAINING 11.1 PPG INFLUENCED ECD - ROP: 110190 FPH, WOB:.7-2.25KLBS - PUW 44K, SOW 21 K ON SHORT WIPERS, DIRECTIONAL PATH FALLING BEHIND PROJECTED 14° DLS, DROP FLOW RATE IN ATTEMPT TO APPLY MORE WOB FOR DIRECTIONAL CONTROL. - NEW PARAMETERS: 2.33 BPM IN, 2.31 BPM OUT, 3480 PSI CIRC PRESSURE, 3200 PSI FREE SPIN, 2.1-4.1K WOB - LOSSES AVERAGING 6 BPH DRILL N DPRB 11,861.00 PROD1 PICK UP FOR WIPER WHILE HAVING 1530 - 2030 5.00 DISCUSSION WITH DIRECTIONAL DRILLER ABOUT SURVEYS. - DISCUSS INABILITY TO KEEP HIGHER TURN RATE AND CONCERN WITH POLYGON WITH TOWNODE. NOTABLE TO DRILL TO THE EXPECTED DOG LEG SEVERITY OF 14° THAT WAS PLANNED FOR THE CURRENT POLYGON RESTRICTIONS. PICKUP AND CONDUCT WIPER AT DIRECTION OF ODE UNTIL POLYGON IS SHIFTED, APPROVED AND DIRECTIONAL PLAN DEVELOPED. - LOSSES WHILE CIRCULATING IN TUBING STEADYAT 34 BPH WITH 10.1 PPG MANAGED PRESSURE AT WINDOW DRILL N DPRB 11,861.00 PROD1 DISCUSSIONS WITH ODE AND DIRECTIONAL 20:30 - 21:00 0.50 DRILLER, RESDEV IS OK WITH NEW POLYGON COORDINATES. - UTILIZE TIME TO PERFORM A KICK WHILE TRIPPING DRILL WITH NEW CREW MEMBER. EVERYONE AT STATIONS IN 37 SEC. Printed 8112017 10:22:37AM 'All depths reported in Drillers Depths' Printed 8/1/2017 10:22:37AM `AIL depths reported in Drillers Depths' North America -ALASKA - BP Page 10 of 16 Operation Summary Report Common Well Name: C-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: dr7/2017 Eno Date: 6/17/2017 X3 -018C2 -C: (2,849,198.00) Project: Prudhoe Bay Site: PB C -Pad Rig Name/No.: CDR -2 Spud Date/Time: 8/11/1979 12:00:00AM Rig Release: 6/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000638 _ Active datum: KB @61.83usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth I Phase Desorption of Operations (hr) (usft) 21:00 - 00:00 3.00 DRILL P PROD? DRILL 4.25" LATERAL FROM 11881' TO 12062' - FREE SPIN: 3455 PSI, 2.5 BPM - RATE: 2.50 BPM IN, 2.49 BPM OUT. CIRC PRESSURE: 3455-3637 PSI - MUD WEIGHT: 8.76 PPG IN, 8.69 PPG OUT, ECD: 10.1 PPG AT WINDOW - ATTEMPT TO DRILL WITH A LOWER RATE AND STAND ON IT TO ASSIST IN GETTING OUR LEFT TURN. - STARTING TO GET DESIRED DOG LEGS _ WHILE MAKING TURN. 6/13/2017 00:00 - 02:00 2.00 DRILL P PROD1 DRILL 4.25"LATERAL FROM 12062'MD TO 12110' ;- FREE SPIN: 3970 PSI, 2.70 BPM �- RATE: 2.69 BPM IN, 2.68 BPM OUT. CIRC PRESSURE: 3970-4150 PSI - MUD WEIGHT: 8.80 PPG IN, 8.73 PPG OUT, ECD: 10.2 PPG AT WINDOW 02:00 - 03:50 1.83 DRILL P PRODI DRILL 4.25' LATERAL FROM 12110'10 12206' - FREE SPIN: 4080 PSI, 2.71 BPM - RATE: 2.72 BPM IN, 2.72 BPM OUT. CIRC PRESSURE: 4080- PSI - MUD WEIGHT: 8.80 PPG IN, 8.74 PPG OUT, ECD: 10.2 PPG AT WINDOW SAMPLES SHOWING 30% CHERT. DOGLEG SEVERITY INCREASING. DISCUSSING WITH 03:50 - 07:00 3.17 DRILL P - PROD1 ODE PERFORM MPD DYNAMIC FLOW CHECK FOR 10 MINUTES: STATIC - MUD WEIGHT: 8.81PPG IN, 8.79 PPG OUT - RATE: 2.80 BPM IN, 2.50 BPM OUT OPEN EDC, POH FROM 12206' MD TO 200' MD WHILE MAINTAINING 10.1 PPG ECDAT WINDOW. - PULL TO SURFACE WITH BHA BELOW BOP. CONDUCT DYNAMIC FLOW CHECK AT.95 BPM WITH SLIGHT LOSSES OVER 10 MIN PERIOD. GOOD FLOW CHECK. 07:00 09:00 2.00 DRILL P PRODI -PULL BHA INTO STACK CONDUCT PRESSURE UN -DEPLOY PER NABORS CHECKLIST WHILE MAINTAINING MANAGED PRESSURE BELOW CLOSED IN SWAB VALVES. - POP OFF WITH INJECTOR AT 0725 HRS - COMPLETE BREAKDOWN OF BHA UTILIZING PRESSURE UN -DEPLOY CHECKLIST 09:00 - 09:15 0.25 DRILL P PROD1 - BIT GRADE 73RD AND BT ON GAUGE ROW FUNCTION TEST BOP STACK FROM 09:15 - 11:30 2.25 DRILL P PROD1 ACCUMULATOR WITH TEST JOINT PRESSURE DEPLOY BHA p6 WITH HYCALOG 11:30 - 16:20 4.83 DRILL P PRODI BIT AND AGITATOR ON .94° MOTOR BEND RIH WITH 4.25' DRILLING BHA #6 - LOG DOWN FOR TIE-IN (FORMATION) WITH 16:20 - 20:15 3.92 DRILL P PROD? -14 CORRECTION DRILL 4.25" LATERAL FROM 12208' MD TO 12509' - FREE SPIN: 3681 PSI, 2.48 BPM - RATE: BPM 2BPM OUT. CIRC PRESSURE:RE: - 3887 -420000 PSI - MUD WEIGHT: 8.81 PPG IN, 8.78 PPG OUT, ECD: 10.2 PPG Printed 8/1/2017 10:22:37AM `AIL depths reported in Drillers Depths' North America - ALASKA- BP Page 11 of 16 Operation Summary Report Common Well Name: C-11 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 6(//2017 End Date: 6/17/2017 X3 -018C2 -C:(2,849,198.00) Project: Prudhoe Bay I Site: PBC —Pad Rig Name/No.: CDR -2 Spud Datartlima: 8/11/1979 12:00:00AM Rig Release: 8/192017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000638 Active datum: KB @61.83usft (above Mean Sea Level) Date From -To HM Task Code NPT Total Depth Phase Description of Operations hr (usft) 2015 - 22:10 1.92 DRILL N STUC 12,508.00 PRODI PULLED 80K NO LUCK. SEEING IT ON WOB. NO PROBLEM ORIENTING, DIFFERENTIALLY STUCK PUMP CUTTINGS UP HOLE. LET RELAX. ATTEMPTED TO PULL FREE, NO LUCK PUMP 15 BBLS 1% KCL SPACER 120 BBLS MINERAL OIL/ 15 BBLS 1% KCL LET SOAK WITH 10 BBLS OUT BIT. PULLED _ _FREE. PUMP LVT AND SPACERS OUT OF BIT. PROD1 PERFORM WIPER TO WINDOW 22:10 - 00:00 1.83 DRILL P LOG TIE TO RATAG WITH +9' CORRECTION. RIH TO BOTTOM TO CONTINUE DRILLING 12,570.00 PRODI DRILL 4.25" LATERAL FROM 12509' 6/142017 - 02:15 2.25 DRILL P 100:00 i- FREE SPIN: 3823 PSI, 2.50 BPM - RATE: 2.52 BPM IN, 2.49 BPM OUT. CIRC PRESSURE 3823-450OPSI - MUD WEIGHT: 8.85 PPG IN, 8.81 PPG OUT, ECD: 10.61PPG i -HAVING TO DROP RATE TO KEEP PUMP PRESSURES DOWN. ECD'S CLIMBING. MUD CLOSE TO 70K 1 -SRV / YP 33 / SOLIDS 1.2% -PREP FOR MUD SWAP. WEIGHTTRANSFER ANISSUE. WILLSWAPTO NEWMUD THEN START INCREASING LUBES. 12,570.00 PROD1 START MUD SWAP. IMMEDIATE 02:15 - 03:30 1.25 DRILL P IMPROVEMENT IN PRESSURES, INCREASE RATE. START DRILLING. 12,698.00 PRODI DRILL 4.25° LATERAL FROM 12600'7012,698' 03:30 - 05:00 1.50 DRILL P - FREE SPIN: 3775 PSI, 2.75 BPM - RATE: 2.74 BPM IN, 2.73 BPM OUT. CIRC PRESSURE: 3828-4071 PSI - MUD WEIGHT: 8.61 PPG IN, 8.65 PPG OUT, ECD: 10.1 PPGATWINDOW - ROP: 130 FT/HR, WOS: 1.9-2.5 KLBS ATTEMPTED TO PULL UPAFTER SIGNS OF BEING DIFFERENTIAL STUCK PULLED HEAVY UP TO 85K, UNABLE TO MOVE PIPE. ABLE TO N ORIENT TOOL FACE, STUCK ABOVE HOT _ 12,698.00 PRODI PULLED80K NOTSEEINGITONWOB. NO 05:00 - 11:30 6.50 DRILL PROBLEM ORIENTING. DIFFERENTIALLY STUCK PUMP CUTTINGS UP HOLE. LET RELAX. UNSUCCESSFUL IN PULLING FREE. PUMP 15 BBLS 1% KCL SPACER / 12 BBLS MINERAL OIL (EVERYTHING IN PUP)/15 BBLS 1%KCL LET SOAK WITH 10 BBLS OUT BIT. UNSUCCESSFUL IN PULLING FREE. WORK PIPE 10 CYCLES, PUMP SECOND LVT AND SPACERS OUT OF BIT. LET RELAX. UNSUCCESSFUL IN PULLING FREE. PUMP 15 BBLS 1% KCL SPACER 115 BBLS MINERAL OIL/ 15 BBLS 1% KCL LET SOAK WITH 10 BBLS OUT BIT. UNSUCCESSFUL IN PULLING FREE. PULLED A TOTAL OF 26 CYCLES SINCE GETTING DETAINED PARK PREP FOR CRUDE Pnnted 6112017 10:22:37AM *AN depths reported in Drillers Depths' North America - ALASKA - SP Page 12 of 16 Operation Summary Report Common Well Name: C-11 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 677/2017 Project: Prudhoe Bay Site: PB C Pad Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: KB @61.83usft (above Mean Sea Level) Date From -To Hrs Task Code (h0 11:30 - 13:00 1.50 DRILL N I ,13:00 - 19:15 8.25 DRILL N 19:15 - 00:00 I 4.75 DRILL N 6/15/2017 00:00 - 03:00 1 3.00 1 DRILL 0300 - 03'.30 0.50 03.30 - 04'.30 1.00 DRILL DRILL P P AFE No End Date: 6/17/2017 X3 -018C2-0:(2,849,198.00) Rig Release: Total Depth (usft) Phase Description of Operations 12,698.00 PRODI CIRCULATE PILLS OOH PREPARE PITSAND PILL TO PUMP 208 BBL CRUDE WORKING INTERMITTINGLY 12,698.00 PROD1 PREPARING TO PUMP DEAD CRUDE -WAITING ON RESULTS HYDROCARBON VAPOR TEST j- RECEIVED APPROVAL TO PROCEED WITH THE HVT AT 1.7 MUD ENGINEER TAKE SAMPLE OF CRUDE i- FROM LRS. MUD BALANCE WEIGHT= 7.1 PPG - RU LRS TO CEMENT LINE. PT TO LOW 250 PSI AND 4471 PSI FOR 5 MIN. BLEED DOWN 12,698.00 PROD1 PUMP SCHEDULE PER OCNk5 - PUMP 20 BBLS 1% VISCOSIFIED KCL - PUMPED 180 BBLS OF DEAD CRUDE (TOOLS POPPED FREE) 21:18 - TAIL WITH 20 BBLS 1% VISCOSIFIED KCL. - RECIPROCATE OFF BOTTOM WHILE GETTING OUR 8.6 PPG MUD TO THE BIT. - TAG TO WHEN MUD COMING OUT OF BIT, START WIPER TO WINDOW - START SENDING 1%AND DEAD CRUDE OUT TO TIGER TANK - ONCE LAST SPACER AND MUD COMING OUT TOP. - PURGE RISER TO TV3 OUT TO TIGER TANK UNTIL CLEAN MUD. - BRING MUD BACK INSIDE. -PULL THROUGH WINDOW WITH NO ISSUE. - LOG TIE IN WITH +5' CORRECTION WHILE PUMPING BOTTOMS UP. -CLOSE EDC. HEAD BACK TO BOTTOM 12,800.00 PROD1 DRILL 4.25° LATERAL FROM 12697' - FREE SPIN: 3785 PSI, 2.74 BPM - RATE: 2.74 BPM IN, 2.73 BPM OUT. CIRC PRESSURE: 3785-4400 PSI - MUD WEIGHT: 8.64 PPG IN, 8.81 PPG OUT, ECD: 10.1 PPG AT WINDOW - ROP: 60 FT/HR, WOB: 1.5 - 3.0 KLBS MUD ENGINEER STARTED INCREASING LUBES BY 1% MAKING FREQUENT PICK UPS 12,81000 PROD? DRILL 4.25"LATERAL FROM 12697'TO 12819 - FREE SPIN: 3683 PSI, 2.75 BPM - RATE: 2.74 BPM IN, 2.73 BPM OUT. CIRC PRESSURE: 3785-4400 PSI - MUD WEIGHT: 8.64 PPG IN, 8.65 PPG OUT, ECD: 10.1 PPG AT WINDOW - ROP: 60 FT/HR, WOB: 1.5 - 3.0 KLBS STARTING TO GET GRABBY, START TAKE WEIGHT. PULLING 80+ 12,820.00 PRODi PERFORM SHORT 200'BHA WIPER DRILL 4.25° LATERAL FROM 12810' - FREE SPIN: 3683 PSI, 2.75 BPM - RATE: 2.74 BPM IN, 2.73 BPM OUT. CIRC PRESSURE: 3785-4400 PSI - MUD WEIGHT: 8.64 PPG IN, 8.65 PPG OUT, ECD: 10.11PPGAT WINDOW - ROP: 30 FT/HR, WOB: 1.5-3.0 KLBS 10:22:37AM *Ail depths reported in Drillers Depths' Printed 8/1/2017 10:22:37AM 'AII depths reported in Drillers Depths" North America - ALASKA - BP Page 13 of 16 Operation Summary Report Common Well Name: C-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/7/2017 End Date: 6/17/2017 ''.X3 -018C2 -C: (2,849,198,00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: CDR -2 Spud DatelT!me: 8/11/1979 12:00:OOAM Rig Release: 6/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000638 Active datum: KB @61.83usft (above Mean Sea Level) Date From -To Him Task 1 Code NPT Total Depth Phase Description of Operations (hr) (usft 04:30 - 06:00 1.50 DRILL N 12,836.00 PROD? I SIGNIFICANT AMOUNT OF MOTOR RUBBER ! COMING ACROSS SHAKER MONITOR WELL FOR 10 MINUTES MPD DYNAMIC FLOW CHECK: STATIC - MUD WEIGHT: 8.67 PPG IN, 8.63 PPG OUT - RATE: 2.96 BPM IN, 2.87 BPM OUT - OPEN EDC, POH FROM 10400' MD - RATE: 3.92 BPM. CIRC PRESSURE:3250 PSI THICK VISCOUS MUD RETURNING BACK TO SURFACE RESULTING IN HIGH ECDAND !ANNULAR PRESSURES 06:00 - 07:20 1.33 DRILL N 12,836.00 PROD1 CIRCULATE THICK MUD TO TIGER TANK -ISOLATE PIT 1 AND TAKE RETURNS TO OUTSIDE -DISPOSE A TOTAL OF 120 BBLS -2.0 BPM / 3200 PSI -FLUSH CHOKE LINE 07:20 - 09:55 2.58 DRILL N 12,836.00 PROD? POH 4.0 BPM / 3500 PSI -HOLDING 10.8 ECD AT WINDOW 09:55 - 10:30 0.58 DRILL N 12,836.00 PROD1 LAY DOWN BHA#6 -FLOW CHECK WELL FOR TEN MINUTES, WELL STATIC -PJSM ON LD BHA -POP-OFF AT 09:55 10:30 - 16:00 5.50 DRILL P 12,836.00 PRODI CUT 19'OF COIL AND REHEAD -BHI MU UOC AND TEST E -LINE -PULLTEST TO 50 K -PT LOG AND CHECKS -PT COIL CONNECTOR CLEAR OUT MICRO -MOTION OFA SMALL PIECE OF DEBRIS 16:00 - 16:30 0.50 DRILL N 12,836.00 PROD? MU BHA#7 -MU NEW MOTOR, 4.25" HYCALOG BITAND AGITATOR STAB ON AT 16:20 16:30 - 19:45 3.25 DRILL N 12,836.00 PROD1 RIH WITH 4.25° DRILLING BHA #7 - RATE: 0.3 BPM IN, 0.8 BPM OUT. - MUD WEIGHT: 8.62 PPG IN, 8.59 PPG OUT - MAINTAIN 10.1 PPG ECD AT WINDOW, ! - LOG DOWN FOR TIE-IN FROM 10420' TO 10453' MD (FORMATION) WITH -14' CORRECTION I - RIH TO BOTTOM. SAT DOWN IN SHALEAT 11371'. PICKED UP AND WENT BY. _ - PU WEIGHT 42K, RIH WEIGHT 18K 19:45 - 22:00 2.25 DRILL P 12,960.00 PROD1 DRILL 4.25° LATERAL FROM 12836'MD TO 12960' - FREE SPIN: 3448 PSI, 2.78 BPM - RATE: 2.84 BPM IN, 2.83 BPM OUT. CIRC PRESSURE: 3448-4000 PSI - MUD WEIGHT: 8.66 PPG IN, 8.66 PPG OUT, ECD: 10.12 PG 80 FT -ROP: 30.80 FTMR, WOB: 1.0-3.0 KLBS Printed 8/1/2017 10:22:37AM 'AII depths reported in Drillers Depths" North America -ALASKA - 3P Page 14 of 16 Operation Summary Report Common Well Name: C-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 8/7/2017 End Date: 6/17/2017 (2,849,198.00) IX3-018C2-C: Project Prudhoe Bay Site: PB C Pad 1 Rig Name/No.: CDR -2 Spud DateTme: 8/11/1979 12:00:00AM Rig Release: 6/19/2017 Rig Contractor NABORS ALASKA DRILLING INC. BPU01: USA00000638 Active datum: KB @61.83usR (above Mean Sea_ Level)_ Date From -To Hrs Task Code NPT Total Depth' Phase Description of Operations (hr) usR) 22:00 - 00:00. 2.00 DRILL P 13,051.00 PROD? DRILL 4.25' LATERAL FROM 12960'- 13051' - FREE SPIN: 3448 PSI, 2.78 BPM - RATE: 2.84 BPM IN, 2.83 BPM OUT. CIRC PRESSURE: 3448-4000 PSI - MUD WEIGHT: 8.66 PPG IN, 8.66 PPG OUT, ECD: 10.12 PPG - ROP: 30-80 FT/HR, WOB: 1.0-3.0 KLBS 6/16/2017 00:00 - 01:30 1.50 DRILL P 13,157.00 PROD? DRILL 4.25" LATERAL FROM 13051'TO 13157' - FREE SPIN: 3446 PSI, 2.78 BPM - RATE: 2.84 BPM IN, 2.83 BPM OUT. CIRC PRESSURE: 3448-4000 PSI - MUD WEIGHT: 8.66 PPG IN, 8.66 PPG OUT, ECD: 10.12 PPG 1 -ROP: 84100 FT/HR, WOB: 1.0-3.0 KLBS 01:30 - 02:30 1.00 DRILL N 13,157.00 L PROD? ATTEMPTED TO PULL FREE (DI FFERENTIALLY STUCK) RELAX HOLE. NO AVAIL. SEEING RESPONSE ON WOB. CAN ROTATE HOT FREELY. MOST LIKELY STUCK ON RESISTIVITY. PUMP 15 BELS 1%VISCOSIFIED KCL PUMP 20 BBLS MINERAL OIL PUMP 15 BBLS 1% VISCOSIFIED KCL PUMP SPACER / 10 BBLS MINERAL OIL OUT BIT, 12BBLSLVTOUT. PULLEDFREE. CONTINUE CIRCULATING REMAINING LVT AND SPACER OUT. WIPER TO WINDOW 02:30 - 04:00 1.50 DRILL P T 13,157.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW FROM 13157' MD TO 10400' MD - RATE: 2.77 BPM IN, 2.63 BPM OUT. CIRC PRESSURE: 3650 PSI -LOG DOWN FOR TIE-IN (RA TAG) WITH +7' 04:00 - 06:00 200 DRILL P 13,157.00 PROD1 RIH WITH 4.25"DRILLING BHA - RATE: 2.14 BPM IN, 2.05 BPM OUT. CIRC PRESSURE: 2688 PSI - MUD WEIGHT: 8.67 PPG IN, 8.63 PPG OUT - MAINTAIN 10.1 PPG ECDAT WINDOW, CHOKE PRESSURE: 150 PSI 06:00 - 07:15 1.25 DRILL P T 13,157.00 PROD1 DRILL4.25' LATERAL FROM 1315TTO 13275' - FREE SPIN: 3558 PSI, 2.78 BPM - RATE: 2.84 BPM IN, 2.83 BPM OUT. CIRC PRESSURE: 3448-4000 PSI - MUD WEIGHT: 8.66 PPG IN, 8.66 PPG OUT, ECD: 10.12 PPG - ROP: 80-100 FT/HR, WOB: 1.0 - 3.0 KLBS 07:15 - 09:00 1.75 DRILL N 13,275.00 PROD1 ATTEMPTED TO PULL FREE (DIFFERENTIALLY STUCK) RELAX HOLE. NOAVAIL. SEEING RESPONSE ON WOB, CAN ROTATE HOT FREELY. MOST LIKELY STUCK ON RESISTIVITY. PUMP 15 BBLS 1%VISCOSIFIED KCL PUMP 20 BBLS MINERAL OIL PUMP 15 BBLS 1%VISCOSIFIED KCL PUMP SPACER/ 6 BBLS MINERAL OIL OUT BIT. PULLED FREE. CONTINUE CIRCULATING REMAINING LVT AND SPACER OUT. WIPER TO WINDOW Printed 8/1/2017 10:22:37AM •AII depths reported in Drillers Depths" North America - ALASKA - BP Page 15 of 16 Operation Summary Report Common Well Name. C-11 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 67/2017 End Date: 6/17/2017 X3-01BC2-C:(2,849,198.00) Project: Prudhoe Bey Site: PB C Pad Rig Name/No.: CDR-2 Spud DatefTime: 8/11/1979 12:00:OOAM Rig Release: 6/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000638 Active datum: KB @61.83usR (above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (us :09:00 - 11:00 2.00 DRILL P 13,275.00 PRODt I PERFORM LONG WIPER TRIP TO WINDOW FROM 13275' MD TO 10400' MD - RATE: 2.8 BPM IN, 2.74 BPM OUT. CIRC PRESSURE: 3800 PSI - LOG DOWN FOR TIE-IN (RA TAG) WITH+6' -RIG AT 40' FPM 0.40 BPM / 1500 PSI PROW DRILL 4.25" LATERAL FROM 13275' T0134W- 11:00 - 15:45 4.75 DRILL P 13,432.00 - FREE SPIN: 3860 PSI, 2.78 BPM til br7— r - RATE: 2.84 BPM IN, 2.83 BPM OUT. CIRC PRESSURE: 3780-4000 PSI - MUD WEIGHT: 8.70 PPG IN, 8.70 PPG OUT, ECD: 10.37 PPG - ROP: 80-100 FT/HR, WOB: 1.0 — 3.0 KLBS WIPERS AS NEEDED 15:45 - 17:15 1.50 DRILL N 13,432.00 PROD1 DIFFERENTIALLY STUCK RELAX HOLE. NOAVAIL. SEEING RESPONSE ON WOB. CAN ROTATE HOT FREELY. MOST LIKELY STUCK ON RESISTIVITY. PUMP 15 BBLS 1%VISCOSIFIED KCL PUMP 17 BBLS MINERAL OIL PUMP 15 BBLS 1% VISCOSIFIED KCL PUMP SPACER 112 BBLS MINERAL OIL OUT PULLED FREE, CONTINUE CIRCULATING REMAINING LVT AND SPACER OUT. WIPER TO WINDOW PROW WIPER TO WINDOW. INTERMITTENT POWER. 17:15 - 18:30 1.25 DRILL N 13,430.00^ EDC, AN NOW HOT 18:30 - 21:00 2.50 DRILL N _ 13,430.00 PROD? POOH FOR TOOL SWAP OUT GOT COMMS BACK WITH TOOLS ATABOUT 1000' 13,432.00 PROD1 MONITOR WELL FOR IO MINUTES AT BHA: 21:00 - 00:00 3.00 DRILL N STATIC - INJECTOR OFF: 22:10 - LAY DOWN COMPLETE BHI STRING. BHI PERFORMED CHECKS ON STRING -CLOSE SWABS, COME ONLINE DOWN MPD LINE TO MAINTAIN 10.1 PPG AT WINDOW. -TEST UQC. EVERYTHING GOOD. BREAK DOWN CONNECTIONS. - PLENTY OF SLACK REHEAD WIRE / REPLACE FLOW SUB. - MAKE UP AND PT TO 250 LOW / 3500 HIGH. STAB ON AND PT CHECKS IN UQC. --100K ON PACKOFFS. REPLACE 6/17/2017 00:00 - 03:00 3.00 DRILL N 13,432.00 PROD1 FINISH CHANGING PACKOFFS. PREPARE TO TEST. FLOATS IN UQC NOT HOLDING. REPLACE FLOATS AND PACKOFFS. PRESSURE TEST 25013500 FOR 5 MIN EACH CEASE HOLDING MPD, OPEN BOTH SWABS. PERFORM 10 MIN FLOW CHECK. WELL ON X34 BPH LOSSES. SURFACE TESTED TOOL. GOOD TEST. - PRESSURE TEST OTS TO 250 PSI LOW FOR 5 MINUTES / 3500 PSI HIGH FOR 5 MINUTES �- INJECTOR ON: 02:50 Printed 8/1/2017 10,22'.37AM *Ali depths reported in Drillers Depths' t� North America - ALASKA - BP Page 16 of 16 Operation Summary Report Common Well Name: C-11 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Data 6O/2017 End Date: 6/17/2017 X3 -018C2 -C: (2,849,198.00 ) Project: Prudhoe Bay - Site: PBC Ped — — Rig Name/No.: CDR -2 Spud DateRme: 8/11/1979 12:00:OOAM Rig Release: 6/19/2017 Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00000638 Active datum: KB @61.83usft (above Mean Sea Level) Date From - To Him I Task Code NPT Total Depth Phase Description of Operations (hr) (usft) DRILL N 13,432.00 PRO01 RIH WITH 4.25" DRILLING BHA #8 FROM 03:00 - 06:00 3.00 SURFACE - RATE: 3.02 BPM IN, 3.59 BPM OUT. CIRC PRESSURE: 3060 PSI - MUD WEIGHT: 8.70 PPG IN, 8.66 PPG OUT -MAINTAIN 10.1 PPG ECDAT WINDOW, CHOKE PRESSURE: 394 PSI - LOG DOWN FOR TIE-IN FROM 10420' 106:00 - 07:30 1.50 (FORMATION) WITH -CORRECTION DRILL P 13,432.00 PROD? RIH THROUGH OPEN HOLE 10,480 - 13,432 MD SOME DIFFICUILTIES PASSING THROUGH BOTTOM OF WINDOW, 4ATTEMPTS AND PUMP AT 0.27 BPM AND PASSED -RIH AT 0.48 BPM / 1580 PSI -TAG BOTTOM ON DEPTH OF 13,432' MD WITH ZERO WOB NO ISSUES RUNNING TO BOTTOM 07:30 - 09:00 1.50 DRILL P 13,432.00 PROD1 PUMP OUT OF HOLE AT 2.7 BPM 13622 PSI _ DRILL P 13,432.00 PRODt PULLING AT 40 FPM 09:00 - 11:00 2.00 POH TO WINDOW 1-FLOWCHECK WELL FOR 10 MINUTES, WELL ON SLIGHT LOSSES 4-6 BPH -OPEN EDC -JETTED WHIPSTOCK TRAY -POH AT 100 FPM PUMPING 9.8 SLICK COMPLETION BRINE -3.83 BPM / 4160 PSI PAINT TO FLAGS AT 9437 MD AND WINDOW DRILL P 13,43200 PROD1 AT 6392'MD 11:00 - 13:00 2.00 _FLAG POH TO BHA, FLOW CHECK WELL, WELL ON SLIGHT LOSSES OF 4-6 BPH - 9.8 PPG BRINE HOLDING HYDROSTATICAT WINDOW I - POP-OFF AT 11:50 - BIT GRADE = 2 -2 -CTG -X -I -NO -TD -FLUSH AND CLEAN LD BHA Printed 8/1/2017 10:22:37AM `All depths reported in Drillers Depths" Printed 6/1/2017 10.23.13AM 'All depths reported in Drillers Depths' North America -ALASKA- BP Page 1 of Operation Summary Report Common Well Name: C-11 AFE No Event Type: COM- ONSHORE (CON) Start Date: I 6/17/2017 End Date: 6/19/2017 X3 -018C2 -C: (1,331,991.00) Project: Prudhoe Bay Site: PB C Pad Rig NamrlNo.: CDR -2 Spud Daterrime: 8/11/1979 12:00:OOAM Rig Release: 6/19/2017 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000638 Active datum: KB @61.83usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth I Phase Description of Operations (hr) (usft) 8/17/2017 13:00 - 15:00 2.00 RIGU P 13,432.00FRUNPRDDPUMP _ E -LINE FORWARD A -PUMP 69'OF ELINE OUTAND CUT 15:00 - 16:00 1.00 RIGU P 13,43200PUMP 3/4"BALL TO NOZZLE -BALL LANDED AS CALCULATED -60.3 BELS -BROKE OFF CROSSOVER AND NOZZLE, _ 13,432.00 RUNPRD RECOVERED BALL 16:00 - 18:30 2.50 RIGU P RIG UP TO RUN COMPLETION LINER -VERIFY FLOW PATH IS CLEAR -PICK UP REMAINING PUP JOINTS AND CROSSOVERS 18:30 - 00:00 5.50 CASING P 13,432.00 RUNPRD MAKE UP 3-1/2" x 3-1/4" x 2-7/8" L-80 PRODUCTION LINER - MAKE UP SHORT SHOE TRACK WITH BULL NOSE, AGITATOR, STAGE COLLAR, FLOAT, 10' PUP JOINT, FLOAT - RUN 32 JOINTS 2-7/8" 6.5#, L-80, ST -L WITH CEMENTRALIZER (FILLING FIRST FIVE, THEN EVERY 10 AFTER) - RUN 2-7/8" X 10' RA PUP - RUN 53 JOINTS 2-7/8" 8.50, L-80, ST -L WITH CEMENTRALIZER (FILLING EVERY 10 JOINTS) _ 6/18/2017 00:00 - 0400 4.00 CASING P 13,432.00 RUNPRD CREW CHANGE. COUNT PIPE. COUNT VERIFIED - RUN SAFETY JOINT IN WHILE SWAPPING HANDLING EQUIPMENT - RUN (07) 3-1h4" 6.6#, L-80, TCII JOINTS W/ CEMENTRALIZERS (COUNT VERIFIED) -RUN SAFETY JOINT IN WHILE SWAPPING HANDLING EQUIPMENT - RUN (26) 3-1/2" 9.3#, L-80, ST -L JOINTS NO CEMENTRALIZERS - RUN 3-1/2" PUP JOINT - RUN SAFETY JOINT IN WHILE SWAPPING HANDLING EQUIPMENT 0400 - 0630 2.50 CASING P 13,432.00 RUNPRO MAKE LINER HANDLING BHA -PU 7JTS OF 27/8 pHs AND DEPLOYMENT ASSEMBLY INJECTOR ON AT 06:10 TEST OTS 250 PSI LOW FOR 5 MINUTES AND 3500 PSI HIGH FOR 5 MINUTES, BOTH PASSING TEST Printed 6/1/2017 10.23.13AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 2 of 4 Operation Summary Report Common Well Name. C-11 AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/17/2017 End Date: 6/19/2017 X3 -018C2 -C: (1,331,991.00) Project: Prudhoe Bay Site: PBC Pad Rig NarnI CDR -2 Spud Date/Time: 8/11/1979 12:00:00AM Rig Release: 6/19/2017 Rig Contracts[ NABORS ALASKA DRILLING INC. BPUOI: USA00000638 Active datum: KB @61.83us6 (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Descrip8on of Operations (hr) Nam 06:30 - 12:30 6.00 CASING P 13,432.00 RUNPRD RIH WITH PRODUCTION LINER -RIH TO WINDOW PUMPING 9.8 SLICK BRINE MIN RATE AT 0.25 / 1200 PSI �-PASSED THROUGH WINDOW WITHOUT ISSUES 4' CORRECTION TO FLAGS AND COUNTER -START PUMPING DRILLING MUD WITH BEADS DOWN A 1.15 BPM 1605 PSI 130 FPM -AT 12,188' STACKED OUT / BRING PUMP RATE UP TO 2.5 BPM - PHYSICAL IN DICTATION OF AGITATOR WORKING -2.5 BPM 13502 PSI ONLY PUMP WHEN GOING DOWN -WORKED PIPE TO TO BY PUMPING AND LET AGITATOR WORK THE STRING DOWN, DOWN WfS -5 TO 10 K -BEADS COMPLETELY AROUND !-TAG BOTTOM AT 13,438 WITH -5 K WT, WT DID NOT WORK OFF 8' DIFFERENCE IN COUNTER, LINER ON BOTTOM AT 12:00 HRS PULED TO 42K UP OBSERVE PUMP PRESSURE DROP FROM 4300 PSI TO 3300 PSI AND SMOOTH PU DYNAMIC FLOW CHECK WELL /WELL STATIC NO LOSSES P 13,432.00 RUNPRD POH WITH RUNNING TOOL 12:30 - 14.30 2.00 CASING -1.5 BPM AND 1100 PSI j I -PULLED AT 100 FPM -WELL ON LESS THAN 2 BPH LOSSES -FLOW CHECKAT SURFACE TO HANDLE BHA - WELL STATIC P 14-.30 - 16'.00 1.50 CASING 13,432.00 RUNPRD LD BHA -LD 6 JOINTS OF PH 6 AND BROKE OFF RUNNING TOOL ON JOINT 7 -PU SEALASSEMBLY -CUT ADDITIONAL 115' OF ELINE FOR A TOTAL OF 184' PUMP OUT -PU A TOTAL 7 JOINT S OF 2 3/8 PH6 AND SEALASSEMBLY -STAB ON AT 0600 HRS _ 16:00 - 19.00 3.00 CEMT P 13,432.00 RUNPRD RIH WITH SEALASSEMBLY TO CEMENT LINER - 750 PSI @ 0.25 BPM - PICKUP WEIGHT - PRESSURE INCREASE OF 100 PSI AT 9653'. COME OFFLINE WITH PUMP - STING IN TO 9658' - COME ONLINE WITH PUMP AT 0.25 BPM. BRING PRESSURE UPT02000M, BALLSEAT SHEARED. REGAINED RETURNS. 13,432.00 RUNPRD CIRCULATE WELL OVER TO 1% KCL 19:00 - 20:00 1.00 CEMT P - 2.90 BPM IN, 2.90 BPM OUT - 8.43 PPG IN 19.01 PPG OUT 13,432.00 RUNPRD PJSM, DISCUSS PRESSURE X -CHECK WITH 20:00 - 21:45 1.75 CEMT P SCHLUMBERGER I NABORS/BOT BYPASS MM / PRESSURE TEST UP AGAINST CLOSED IRV TO 250 PSI LOW FOR 5 MIN AND 4850 PSI FOR 5 MIN. LINE UP DOWN CIRCULATION PATH FOR CEMENTING. SCHLUMBERGER START BATCHING CEMENT Pnnted 6/1/2017 10:23-.13AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 3 of 4 Operation Summary Report Common Well Name: C-11 AFE No Event Type: COM- ONSHORE (CON) Start Date: 6/17!2017 End Date: 6/19/2017 X3-018C2-C: (1,331,991.00) Project: Prudhoe BaySBe: PBC Pad Rig Name/No.: CDR-2 Spud DateTme: 8/11/1979 12:00:OOAM Rig Release: 6/19/2017 Rig Contractor. NABORSALASKA DRILLING INC. BPUOI: USA0000063S Active datum: KB @61.83usft (above Mean Sea Level) Date From- To Hrs Task Code 1 NPT Total Depth Phew Description of Operations (hr) Waft 21:45 - 00:00 2.25 CEMT P 13,432.00 RUNPRD MIX AND PUMP 37.8 BBLS OF CEMENT: I- FILL LINES WITH WATER AND PRESSURE TEST TO 4840 PSI FOR 5 MINUTES '- CEMENT WET AT 21:24 HRS. - ZERO IN MM ONCE DENSITY= 13.5 PPG - LOAD 37.8 BBLS 15.3 PPG CEMENT IN REEL - SWAP TO RIG PUMP. CLEANUP LINES TO SLB UNIT. - PERFORM DISPLACEMENT WITH RIG PUMPS - DISPLACE CEMENT WITH 8.4 PPG EXHAUST PILL - RATE: 2.56 BPM IN, 2.47 BPM OUT - ZERO OUT MM WITH CEMENTAT SHOEAT 83.3 BBLS AWAY - TAKE RETURNS TO PIT 3 FOR MANUAL STRAP - SHUT DOWN PUMPS AT 122 BBLS AWAY (30.3 BBLS BEHIND PIPE) - OPEN P3/ P4 AND CHECK FLOATS. GOOD TEST. - CEMENT IN PLACE: 22:55 HRS - UNSTING FROM LINER. CIRCULATE CEMENT OFF LINER TOP. - START JETTING AT 3.0 BPM IN 12.90 BPM - MAKE SLOW PASS ACROSS 9400' TO 9650' �- PUMPED BOTTOMS UP, SLUG OF 12.6 PPG COME OUT AN DROPPED BACK TO 8.4 PPG. - LAY CLEAN 1.25 PPG GEOVIS FROM LINER TOP UP TO 9400' - POOH CIRCULATING 1% SLICK KCL. 6/19/2017 00:00 - 02:00 2.00 CEMT P 13,432.00 RUNPRD - MUD WEIGHT: 8.4 PPG IN, 8.4 PPG OUT - RATE: 2.85 BPM IN, 2.50 BPM OUT JETTING JEWELRY WHILE COMING OUT OF HOLE. MAKE PASS ACROSS GLM #4 RU LRS, PT 250 PSI LOW / 3500 PSI HIGH 02:00 - 03:00 1.00 CEMT P 13,432.00 RUNPRD LOAD COIL WITH 50 BBLS DIESEL WITH LRS LAY IN DIESEL FROM 2500' TO SURFACE. 03:00 - 04:00 1.00 CEMT P 13,432.00 RUNPRD MONITOR WELL FOR 10 MINUTES AT BHA: STATIC - INJECTOR OFF: 03:30 - LAY DOWN 2-3/8" PH6 x 7 - CEMENT STINGER 04:00 - 06:30 2.50 DEMOB P 13,432.00 POST CLOSE MASTER VALVE. PREPARE FOR END OF WELL OPS -FLUSH STACK -FUNCTION RAMS -CLEAR FLOOR OF EXCESS EQUIPMENT 06:30 - 08:00 1.50 DEMOB P 13,432.00 POST PUMP SLACK AT BPM WITH FRESH WATER -CUT 280' OF COIL 08:00 - 11:00 3.00 DEMOB P 13,432.00 POST RE-HEAD PULL TEST TO 50 K -TEST 5 MINUTES EACH TO 250 LOW AND 3600 PSI, PASSING TEST -PUMP SLACK FORWARD -BLOW COIL DOWN WITH RIG COMPRESSOR -SET UP FOR BHI TO MAKE UP UGC / FLOATS /CHECK VALVES Pnnted 8/1/2017 10:23:13AM *All depths reported in Drillers Depths* Printed 8/1/2017 10:23:13AM 'All depths reported in Drillers Depths' North America - ALASKA - Blo Page 4 of 4 Operation Summary Report Common Well Name: C-11 AFE No Event Type: COM- ONSHORE (CON) Start Data 6/17/2017 End Date: 6/192017 X3 -018C2 -C: (1,331,991.00) Project: Prudhoe Bay Site -RB C Pad Rig Name/No.: CDR -2 Spud DateRme: 6/11/1979 12:00:OOAM Rig Release: 6/192017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000638 Active datum: KB ®61.83usft (above Mean Sea Level) Date Fran -To Hrs Task Code NPT Total Depth Phase Description of Operations _ (hr) I (usft) 11:00 - 16:00 5.00 DEMOB P 13,432.00 POST PREPARE TO NIPPLE DOWN AND RDMO TEST TREE CAP FLANGE TO 3500# NO VISUAL LEAKS RIG RELEASE AT 16:00 FINISH RIG DOWN 12 X 12 CHOCK IN PLACE COMMUNICATIONS IN PLACE. CREW IS AWARE THAT WELL DOES NOT HAVE A BPV Printed 8/1/2017 10:23:13AM 'All depths reported in Drillers Depths' Daily Report of Well Operations C-11 B ACTIVITYDATE CI IMMGRY T/I/O = VAC/20/? Temp =SI. TBG & IA FL (Pre Liner Lap Test). TBG FL near surface. (-2 bbls). IA FL @ 230' (11 bbls). Unable to access OA due to Rig scaffolding on top of floor kit. 6/20/2017 SV, WV, SSV = C. MV = O. IA = CTG. OA = ?. 09:00 T/l/O = 9/5/20. Temp = SI. Liner lap Test (Post Rig). T FL near surface. IA FL @ 230' (11 bbls). Pumping in progress. 6/21/2017 ***Continued on 6/2/17 WSR*** T/1/0=0/0/0 N/D upper CDR 2 Tree, N/U production tree. PT'd tree against 6" CIW "H" TWC. Pulled TWC. N/D 3" piggyback IA valve Temp. #67. job complete. FWP's 0/0/0 see log for 6/21/2017 details. ***Continued from 6/21/17 WSR*** T/1/0 = 100/90/20. Temp = SI. Liner Lap Test FAILED (Post Rig). Max applied = 1490 psi, Target pressure = 2360 psi. Continue to pump a total of 38 bbls of diesel and obtained a LLR on T/IA of 7.1 GPM @ 1485 psi for 30 min. Monitored 30 min. TP/IAP decreased to 902/905 psi. Bled TP/IAP from 902/905 psi to 70/70 psi in 10 min (2 bbls). Tags hung. Final WHPs = 70/70/20. 6/22/2017 SV, WV, SSV = C. MV = O. IA, OA = OTG. 0340. T/I/O = 42/4/1 (LRS Unit 72 - Assist Slickline: Liner Top Packer) CMIT-TxIA **Inconclusive** Pumped 31 bbls of crude into the TBG and IA simultaneously to compensate for 58% tubing wall loss. Establish LLR of 1.3 bpm at 2490/2390 of TBG/IA pressure. 6/24/2017 ***Job Cont to 06-25-2017 WSR*** ***WELL S/I ON ARRIVAL***(ctd) RAN 30'7" x 3.70 DUMMY PATCH DRIFT TO 3,500' SLM (no issues) RAN DUMMY LTP DRIFT TO 3.70 DEPOLYMENT SLEEVE @ 9,642' MD (tattle tales indicate good set) SET NORTHER SOLUTIONS LTP W/ PTSA IN DEPLOYENT SLEEVE @ 9,642' SLM LRS ATTEMPED TO TEST LTP (obtained a 7gpm LLR) EQUALIZE & PULLED 2-7/8" XX PLUG FROM PTSA MADE 3 ATTEMPTS TO PULL LTP (total jar time 1.5 hrs) 6/24/2017 ***CONTINUED ON 06-25-17 WSR*** ***Job Cont from 06-24-2017 WSR*** (LRS Unit 72 -Assist Slickline: Liner Top Packer) Pump 25 bbls of crude as directed to prove leak while SL uses standing valve. Pumped 190 bbls of 60* DSL down IA to load IA before before SLine set ST#3. 6/25/2017 ***Job Cont to 06-26-2017 WSR*** ***CONTINUED FROM 06-24-17 WSR*** MADE SEVERAL ATTEMPTS TO PULL LTP FROM DEPLOYMENT SLEEVE @ 9,642' MD (unsuccessful, total jar time 31hrs 40min) RAN D&D HOLE FINDER (able to pressure up to 2100psi 9,553' slm, move up hole to 9,429' slm & unable to pressure up) 5" LONG x 1/2" WIDE CHUNCK OF RUBBER MISSING FROM ELEMENT ON D&D SET 4-1/2" WHIDDON ON TOP OF LTP @ 9,621' SLM PULLED BK-DGLV FROM ST#3 @ 5,671' MD LRS LOADED IA W/ 190bbls DIESEL 6/25/2017 ***CONTINUED ON 06-26-17 WSR*** Daily Report of Well Operations C-11 B ***CONTINUED FROM 06-25-17 WSR***(ctd) MADE 3 ATTEMPTS TO SET BK-LGLV IN ST#3 @ 5,671' MD RAN POCKET BRUSH w/ TATTLE TALE PINS TO ST#3 (pins sheared, indicating in pocket all the way) SET BK-LGLV (tro 1600#, 20/64" ports) IN ST#3 @ 5,671' MD R/D 4519 & SWAP TO 4522 AND R/U .160 JAR ON LTP FOR 1 hr @ 3200# (no movement) 6/26/2017 ***CONTINUED ON 06-27-17 WSR*** ***Job Cont from 06-25-2017 WSR*** (LRS Unit 72 - Assist Slickline: Liner Top Packer) SB for Stine to set ST#3. SB for Stine to pull and set LTP. No fluids pumped ***Job Cont to 06- 6/26/2017 27-2017 WSR*** ***CONTINUED FROM 06-26-17 WSR***(ctd) JARRED ON LTP FOR 50min (metal from stripped f/n of Itp on gs) PLANTED 3.70" UNIQUE SPEAR IN LTP 9,615' SLM PULLED NORTHERN SOLUTION LPT W/ PTSA FROM DEPLOYMENT SLEEVE @ 9,642' SLM (missing one full element) RAN 3.625 WIRE GRAB, 4-1/2" BRUSH TO TOP OF DEPLOYMENT SLEEVE (no recovery) RAN 2.60 WIRE GRAB, 3-1/2 " BRUSH TO 9,700' SLM (recovered 1/2 of the missing element) RAN 2.60 WIRE GRAB, 3-1/2" BRUSH TO 9,770' SLM (recovered 1" x 4" piece of metal) RAN 2.60 WIRE GRAB, 3-1/2" BRUSH TO DEVIATION @ 9,770' SLM (recovered small piece of metal) CURRENTLY RUNNING HES 24 ARM CALIPER 6/27/2017 ***CONTINUED ON 06-28-17 WSR** ***Job Cont from 06-26-2017 WSR*** (LRS Unit -Assist Slickline: Liner Top Packer) RD from IA. No fluids pumped. SLine in control of well per LRS departure. ***Tag hun on IA. AFE sign already on wing 6/27/2017 FWHP's=100/250/0 IA,OA=OTG T/1/0=68/72/14 (LRS Unit 42 -Assist Slickline: Liner Top Packer) CMIT-TxIA Target pressure = 2360 psi Max applied = 2500 psi Attempted to reach test pressure 3 times, unable to get test. LLR=1 bpm @ 2000 psi- SSL on well upon departure. Caution tags /AFE sign hung on well. 6/28/2017 FWHP=315/354/15 ***CONTINUED FROM 06-27-17 WSR***(ctd) RAN HES 24 ARM CALIPER FROM 9700' SLM TO 9405' SLM RAN 2.1" MAGNET TO DEVIATION @ 9,770' SLM (recovered -10 small pieces of metal) RAN 3.50" LIB TO TOP OF DEPLOYMENT SLEEVE @ 9,642' MD (impression of 1/2 of the fish neck & 1/2 possibly damaged fish neck) RAN 45KB LTP DRIFT TO LINER @ 9,622' SLM SET 4-1/2" NORTHERN SOLUTIONS LTP W/ PTSA IN DEPLOYMENT SLEEVE @ 9,624' SLM LRS ATTEMPT CMIT TxIATO 2,500psi (FAIL, LLR OF 1 BPM @ 2,000psi) SET LTTP IN NORTHERN SOLUTIONS LTP @ 9,607' SLM (FAIL, LLR OF 1 BPM @ 2,000psi) EQUALIZE & PULL 2-7/8" XX PLUG FROM PTSA @ 9,628' SLM JAR ON LTP @ 9,609' SLM FOR 1 hr (no movement) 6/28/2017 ***CONTINUED ON 06-29-17 WSR*** **CTU #14 1.75" CT** Stand by for slickline to complete work. 6/28/2017 **Cont onto 6-29-17 WSR** Daily Report of Well Operations C-11 B CTU #14 - 1.75" CT (Mill/RPM/Pert with Pressure Deployment System). **Cont from WSR 06/28/17** Stand by for slickline to pull LTP & well support to rig up. Begin RU of pressure deployment system. 6/29/2017 ***Continue on WSR 06/30/17*** **Cont from 6-28-17 WSR** Stand by for slickline to pull LTP, Well support to rig up iron and pressure deployment to get 6/29/2017 Isetup. ***CONTINUED FROM 06-28-17 WSR***(ctd)*** PULLED NORTHERN SOLUTIONS LTP @ 9,600' SLM (2hrs jarring) 6/29/2017 ***WELL LEFT S/I ON DEPARTURE, PAD -OP NOTIFIED OF STATUS*** CTU #14 - 1.75" CT (Mill/RPM/Pert with Pressure Deployment System). **Cont from WSR 06/29/17** RU pressure deployment system. Perform truncated 7 day BOP test. M/U and RIH w/ Baker 1.69" motor and 2.30" 4 bladed junk mill. Sat down in 3 1/2" liner @ 9892, 9929, pump min rate an able to get past. Mill up obstruction @ 12320'. Saw a couple more hard spots that milled up easily. Circulate in some safelube due to weight transfer issues in 2-7/8" liner. Continue milling to PBTD. 6/30/2017 ***Job Continue on WSR 07/01/17*** CTU #14 - 1.75" CT: (Mill/RPM/Pert with Pressure Deployment System). **Cont from WSR 06/30/17** Continue milling to PBTD. Tag bottom @ 13402' do / 13389' up. Didn't see much motor work, but starting -12700' we were getting a stall every -31', which is the length of joints for the 2- 7/8" completion. Pump 10 bbls gel @ PBTD, backream out of liner. Launch 3/8" ball and open circ sub once out of liner, increase rate and chase to surface. Mill looked pretty clean, 2.31" go, 2.28" no-go. Make up Baker RPM tools and tag TD @ 13409' CTM. Log from PBTD to 8700'@ 20 fpm. Perform repeat pass from 9850' to 9500'@ 20 fpm. POOH with tools. Download log data and make (+) 10' correction. Start RU pressure deployment gear. 7/1/2017 ***Continue on WSR 07/01/17*** CTU #14 - 1.75" CT (Mill/RPM/Pert with Pressure Deployment System). **Cont from WSR 07/01/17** RU pressure deployment system. Pressure deploy BHA with 2" Powerjet pert guns. RIH and correct depth to top shot @ PBTD. PUH and park @ 12970' MD. Launch 1/2" ball to initiate detonation sequence. 7/2/2017 ***Job continued on WSR 07/03/17*** CTU #14 - 1.75" CT. (Mill/RPM/Perf with Pressure Deployment System). **Cont from WSR 07/03/17** Continue pumping 1/2" ball to initiate detonation sequence. Perforate interval 12970'- 13001'. RIH and perforate interval: 13030'- 13249'. RIH and perforate interval: 13300'- 13362'. POOH. Undeploy spent guns. - All shots fired. RD work window and hydroconn and take down scaffold. MU and RIH with SLB Memory SCMT. Log from bottom up to 9500'. 7/3/2017 1 ***Job Continued on WSR 07/04/17*** Daily Report of Well Operations C-11 B CTU #14 - 1.75" CT (Mill/RPM/Perfwith Pressure Deployment System). **Cont from WSR 07/03/17** Continue logging memory SCMT. Pull jewelry log to surface., tools came back with good data.RIH w/ Baker motor and polish mill w/ spacer sub and locator tattle tail sub, 3.80" string reamer to deployment sleeve, Dry tag @ 9633' down/ 9628' got wt back, pick up 9618' and get free spin, work polish mill into deployment sleeve and tag up and stall @ 9628', repeated same process 2 more times, called it good. Back reem to XN nipple all clean, drop circ sub ball and chase with diesel. Circ well over to diesel from 8550' to surface to assist in poping well.Polish mill had good marks on it as well as the tattle tail brass showed we were all the way in.RDMO. 7/4/2017 ***Job completed, turned well over to Pad op, left shut in*** 1 ***W ELL S/I ON ARRIVAL***(ctd ). RAN 4-1/2" BRUSH, 3.685" CENT, 3-1/2" BRUSH TO DEPLOYMENT SLEEVE @ 9,642' MD RAN 4-1/2" D&D HOLE FINDER TO TOP OF DEPLOYMENT SLEEVE @ 9,642' MD (LLR OF .45bpm @ 2,000psi) MOVED D&D UP HOLE TO 9,532' SLM, (LLR OF .63bpm @ 2,000psi) (ooh w/ d&d element missing 5" x 1/2" piece) 7/6/2017 ***JOB IN PROGRESS, CONTINUED ON 07-07-17 WSR*** T/I/0= 8/10/4. Assist Slickline Load TBG with 35 bbls crude for Brush & Flush . pumped 29 7/6/2017 bbls crude down TBG to assist Slickline . ***Job continues on 07-07-17*** ***Job continues from 07-06-17***... Assist Slickline. CMIT-TxIA to 2368x2444 Txl, ***PASS***. Pumped 13 bbls crude w/ SLB using DND tool, Pumped 50 bbls crude for brush n flush. Pumped 6.82 bbls to achieve test pressure. 1st 15 min lost 30x28 Txl, 2nd 15 min lost 16x17 Txl, for a total loss of 46x45 Txl. ***PASS*** Bled back — 5.64 bbls. Hang 7/7/2017 tags. FHWP's =433/503/6. SLB on well upon departure. ***CONTINUED FROM 07-06-17 WSR***(ctd) RAN 4-1/2" D&D HOLE FINDER TO 9,621' SLM, 9,548' SLM, 9,005' SLM, 8,836' SLM (d&d element damaged), fine sand in tools, results inconclusive, see LRS log). DRIFT TO & BRUSH 3.70" DEPLOY SLV @ 9,642' MD & 4-1/2" LINER W/ 4-1/2" BRUSH, 3.685" GAUGE RING, Tx 1-1/2" STEM, 3-1/2" BRUSH (No issues). LRS PUMPED 50bbls OF CRUDE DOWN THE TBG TO ASSIST W/ BRUSH & FLUSH. RAN DUMMY 45KB PACKER DRIFT, 4'x 2-7/8" PUP JOINT, NORTHER SOLUTIONS PTSA STINGER TO 3.70" DEPLOYMENT SLV @ 9,642' MD (tattle tails indicate stinger was fully stung in) SET BAKER 45KB PACKER W/ 4'x 2-7/8" PUP JOINT, NORTHERN SOLUTIONS PTSA W/ 2-7/8" X -NIPPLE IN 3.70" DEPLOYMENT SLV @ 9,642' MD. LRS PERFORMED PASSING CMI-TxIA ***WELL S/I ON DEPARTURE, PAD OP NOTIFIED*** 7/7/2017 ***2-7/8" XX PLUG W/ RETRIEVABLE GUIDE SHOE LEFT IN PTSA*** Daily Report of Well Operations C-11 B ***JOB STARTED ON 8 -JULY -2017*** (SLB ELINE SET PATCH) RU. PT. RIH W/ BKR 45 KB 30' PATCH. SET TOP MID ELEMENT OF PATCH AT 3292', CCL TO TOP MID ELEMENT SHOT = 8.2', CCL STOP DEPTH = 3283.8', 30' PATCH. DROP DOWN, TAG PLUG. POOH. LOG CORRELATED TO SLB LEAK DETECT LOG DATED 2 -JULY -2006. RDMO. NOTIFY PAD OP ON DEPARTURE. HANDOVER WELL CERTIFICATE KEPT IN MANIFOLD BUILDING. WELL SHUT IN ON DEPARTURE. **NOTE - STATION # 4 GAS LIFT MANDREL IS COVERED BY TUBING PATCH** 7/8/2017 ***JOB COMPLETE ON 8 -JULY -2017*** T/I/0= 100/212/12 Temp= Shut in. CMIT-TxIA PASSED to 2427/2415 psi. Target psi 2360, max applied psi 2478/2488. MIT -T PASSED to 2456 psi. Target psi 2360, max applied psi 2498. Pressured up Tbg and IA with a total of 11 bbls crude to reach a max applied of 2478/2488 psi on 2nd test. CMIT-TxIA lost 35/54 psi in 1st 15 minutes and 16/19 psi in 2nd 15 minutes for a total loss of 51/73 psi in a 30 minute test. Bled down Tbg and IAP (total —7 bbls). Pressured up Tubing with 2.4 bbls crude to reach a max applied of 2498 psi. MIT -T lost 31 psi in 1 st 15 minutes and 11 psi in 2nd 15 minutes for a total loss of 42 psi in a 30 minute test. Bled down Tbg psi (-2 bbls crude). Hung AFE sign and Tags on wing and IA.. 7/9/2017 FWHP's=398/400/6. ***WELL S/I ON ARRIVAL*** (ctd). EQUALIZE & PULL 2-7/8" XX -RETRIEVABLE -GUIDE -SHOE FROM 45KB LINER TOP PACKER @ 9,645' MD (all intact). ***WELL S/I ON DEPARTURE*** (pad op notified= job complete, well & well house 7/9/2017 condition). �Nr bp North America - ALASKA - BP Prudhoe Bay PB C Pad C-11 C-11 B 500292038202 Design: C -11B Final Survey Report - 19 June, 2017 rias BAKER HUGHES ti-'0*) b BP I/.aw p Final Survey Report BAKER HUGHES Company: NOM America - ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-11 Wellbore: C -11B Design: C -11B Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well C-11 C -11A @ 61.83usft (Nabors 2ES) C -11A (M 61.83usft (Nabors 2ES) True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 roject Prudhoe Bay, GPB, PRUDHOE BAY ap System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level eo Datum: NAD27' OGP-Use AK [4267'15854] Using Well Reference Point ap Zone: NAD27'OGP-Usa AK/Alaska zone 4` 267341586, [ Using geodetic scale factor Site PB C Pad, TR -11-14 Site position: 148° 41'2.797 W From: Map Position Uncertainty: 0.00 usft Latitude: 70° 17'54.775 N Longitude: - Well C-11, C-11 Well Position •N/ -S 0.00 usft +EI -W 0.00 usft Position Uncertainty 0.00 usft Wellbore C -11B Magnetics Model Name BGGM2016 Design C-11 B Audit Notes: Sample Date 6/1/2017 Version: Phase: Vertical Section: Depth From (TVD) (usft) 2878 Northing: Basting: Slot Radius: Northing: Eluding; Wellhead Elevation: 5,957,218.720 usft 662,550.030 usft 0.000 in 5,960,549.000 usft 664,140.000 usft 33.05 usft Latitude: — - - 70° 17'22.673 Longitude: 148° 41'2.797 W Grttl Convergence: 1.24 ° 11 — Latitude: 70° 17'54.775 N Longitude: 148° 40' 14.357 W Ground Level: 32.73usft Declination Dip Angle Field Strength (nT) 17.87 81.01 57,551 ACTUAL Tie On Depth: 10,463.03 +N/ -S 4E/ -W Direction (usft) (usft) (°) Coo 0.00 119.79 6119/2017 5:55:17PM Page 2 COMPASS 5000.1 Build BID 00 by Date 6/19/2017 Asi (azimuth) FIRS .y/♦ Final Survey ReportBAKER To Northing Easting DL" (usft) HUGHES Company: North Amenca- ALASKA -BP Local Co-ordinate Reference: Well C-11 100.55 Project: Prudhoe Bay TVD Reference: C-11A @ 61.83usft (Nabors 2ES) (usft) Site: PB C Pad MD Reference: C-11A @ 61.83usft (Nabors 2ES) MWD+FIR +Multi Station W/O Crustal Well: C-11 North Reference: True MWD Wellbore: C-11B Survey Calculation Method: Minimum Curvature , 5,960,549.000 Design: C-11B Database: EDM RSK-Alaska PROD -ANCP1 Survey Program Date 6/19/2017 Asi (azimuth) TVD TVDSS From To Northing Easting DL" (usft) (usft) Survey (Wellbore) Tool Name Description --� 100.55 8,100.55 C-11 Srvy 1 BOSS -MS (C-11) BOSS -GYRO Sperry -Sun BOSS gyro multishm (usft) 8,193.00 10,463.03 C-11ASrvy1 MWD+FIR+MS(C-11A) MWD+IFR+MS-WOCA MWD+FIR +Multi Station W/O Crustal 28.78 10,481.00 13,432.00 BHI CTK MWD(C-11B) MWD MWD - Standard 0.00 Survey MD Inc Asi (azimuth) TVD TVDSS WS ENV Northing Easting DL" V. Sac (usft) (•) (•) (usft) (usft) (usft) (usft) (usft) (usft) (•1100usft) (usft) 28.78 0.00 0.00 28.78 -33.05 0.00 0.00 5,960,549.000 664,140.000 0.00 0.00 100.55 0.18 32.50 100.55 38.72 0.10 0.06 5,960,549.097 664,140.058 0.25 0.01 200.55 0.23 330.21 200.55 138.72 0.40 0.05 5,960,549.403 664,140.036 0.22 -0.16 300.55 0.38 261.29 300.55 238.72 0.53 -0.38 5,960,549.518 664,139.606 0.37 -0.59 400.55 0.48 234.29 400.55 338.72 0.23 -1.05 5,960,549.208 664,138.945 0.22 -1.03 500.55 0.77 224.69 500.54 438.71 -0.49 -1.86 5,960,548.469 664,138.148 0.31 -1.37 600.55 0.73 216.10 600.53 538.70 -1.48 -2.71 5,960,547.458 664137.323 0.12 -1.62 700.55 0.52 216.60 700.52 638.69 -2.36 -3.36 5,960,546.565 664,136.696 0.21 -1.74 800.55 0.37 229.69 800.52 738.69 -2.94 -3.87 5,960,545.981 664,136.192 0.18 -1.90 --. 900.55 0.28 258.70 900.52 838.69 -3.19 -4.36 5,960,545.714 664,135.712 0.18 -2.20 1,000.55 0.32 272.50 1,000.52 938.69 -3.23 -4.88 5,960,545.667 664,135.194 0.08 -2.63 1,100.55 0.22 296.00 1,100.52 1,038.69 -3.13 -5.33 5,960,545.753 664,134.741 0.15 -3.07 1,200.55 0.20 334.30 1,200.52 1,138.69 -2.89 -5.58 5,960,545.989 664,134.487 0.14 -3.40 1,300.55 0.20 23.60 1,300.52 1,238.69 -2.57 -5.58 5,960,546.306 664,134.475 0.17 -3.57 1,400.55 0.25 17.39 1,400.52 1,338.69 -2.21 -5.45 5,960,546.677 664,134,602 0.06 -3.63 1,500.55 0.32 11.50 1,500.51 1,438.68 -1.72 -5.33 5,960,547.161 664,134.712 0.08 -3.77 1,600.55 0.33 341.71 1,600.51 1,538.68 -1.18 -5.36 5,960,547.707 664,134.665 0.17 4.07 1,700.55 0.42 329.11 1,700.51 1,638.68 -0.59 -5.64 5,960,548.289 664,134.374 0.12 4.60 1,800.55 0.33 338.71 1,800.51 1,738.68 -0.01 -5.93 5,960,548.865 664,134.089 0.11 -5.15 1,900.55 0.40 353.80 1,900.51 1,838.68 0.61 -6.08 5,960,549.478 664,133.913 0.12 -5.58 6/19/2017 5.55.17PM Page 3 COMPASS 5000.1 Build BID �,.•., by BP rias t . N� ►• Final Survey Report HIUGHES Company: NOM America - ALASKA- BP Local Co-ordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: C -11A@ 61.83usR(Nabors 2ES) Site: PB C Pad MD Reference: C -11A @ 61.83ush (Nabors 2ES) Well: C-11 North Reference: True Wellbore: C-118 Survey Calculation Method: Minimum Curvature Design: C -11B Database: EDM RSK-Alaska PROD -ANCP1 Survey - MD Inc AN (azimuth) TVD TVDSS NIS ENV Northing Easting Dlsg V. Sec (usR) (°I PI (usR) IwRI (usf) Waft) IwR) (usR) 11400usfy (usR) 1 2,000.55 0.72 332.00 2,000.50 1,938.67 1.51 -6.41 5,960,550.372 664,133.561 0.38 -6.31 2,100.55 0.35 282.71 2,100.50 2,038.67 2.13 -7.00 5,960,550.981 664,132.954 0.56 -7.14 2,200.55 0.35 256.60 2,200.50 2,138.67 2.13 -7.60 5,960,550.964 664,132.359 0.16 -7.65 2,300.55 0.28 262.10 2,300.49 2,238.66 2.03 -8.14 5,960,550.848 664,131.823 0.08 -8.07 2,400.55 0.70 145.61 2,400.49 2,336.86 1.49 -8.03 5,960,550.313 664,131.938 0.86 -7.71 2,500.55 0.75 127.70 2,500.48 2,438.65 0.58 -7.17 5,960,549.427 664,132.820 0.23 -&51 2,600.55 1.08 103.20 2,600.47 2,538.84 -0.03 -5.73 5,960,548.844 664,134.268 0.50 4.96 2,700.55 1.32 87.90 2,700.45 2,638.62 -0.20 -3.67 5,960,548.716 664,136.340 0.40 -3.08 2,800.55 0.88 80.00 2,800.43 2,738.60 -0.03 -1.76 5,960,548.933 664,138.243 0.46 -1.51 2,900.55 0.60 76.50 2,900.42 2,838.59 0.23 -0.49 5,960,549.216 664,139.502 0.28 -0.54 3,000.55 0.32 92.20 3,000.42 2,938.59 0.34 0.30 5,960,549.345 664,140.288 0.30 0.09 3,100.55 0.30 113.20 3,100.42 3,038.59 0.22 0.81 5,960,549.242 664,140.810 0.11 0.60 3,200.55 0.27 135.20 3,200.42 3,138.59 -0.05 1.22 5,960,548.981 664,141.222 0.11 1.08 3,300.55 0.30 132.50 3,300.42 3,238.59 -0.39 1.58 5,960,548.645 664,141.589 0.03 1.57 3,400.55 0.23 164.11 3,400.41 3,338.58 -0.78 1.83 5,960,548.280 664,141.845 0.16 1.96 3,500.55 1.50 218.00 3,500.40 3,438.57 -2.01 1.11 5,960,547.013 884,141.158 1.37 1.97 3,600.55 5.33 241.19 3,600.21 3,538.36 -5.31 -3.73 5,960,543.610 664,136.390 4.02 -0.60 3,700.55 8.22 22480 3,699.51 3,637.68 -12.64 -12.82 5,960,536.083 664,127.461 3.46 -4.84 3,800.55 7.30 196.29 3,798.63 3,736.80 -23.83 -19.62 5,960,524.745 664,120.904 3.89 -5.19 3,900.55 8.72 191.69 3,897.65 3,835.82 -37.36 -22.94 5,960,511.155 664,117.882 1.56 -1.35 4,000.55 10.30 194.19 3,996.28 3,934.45 -53.45 -26.67 5,960,494.987 664,114.507 1.63 3.41 4,100.55 12.37 196.00 4,094.32 4,032.49 -72.41 -31.81 5,960,475.915 664,109.778 2.10 8.371 4,200.55 14.03 199.00 4,191.68 4,129.85 -94.17 -38.71 5,960,454.012 664,103.356 1.80 13.19 4,300.55 15.93 202.10 4,288.27 4,226.44 -118.35 -47.82 5,960,429.642 664,094.776 2.06 17.30 4,400.55 18.10 205.00 4,383.89 4,322.06 -145.15 -59.55 5,960,402.597 664,083.636 2.33 20.43 4,500.55 20.42 208.10 4,478.29 4,416.46 -174.62 -74.34 5,960,372.811 664,069.500 2.53 22.24 4,600.55 22.60 209.39 4,571.32 4,509.49 -206.75 -91.99 5,960,340.301 664,052.559 2.23 22.89 6119/2017 5:55:17PM Page 4 COMPASS 5000.1 Build BID FO sem by Final Survrvey Report BAKER•■ HUGHES Company: North America - ALASKA -BP Local Co-ordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: C-11A Q 61.83us%(Nabors 2ES) Site: PB C Pad MD Reference: C-11A @ 61.83us6 (Nabors 2ES) Well: C-11 North Reference: True Wellbore: C-118 Survey Calculation Method: Minimum Curvature Design: C-11B Database: EDM RSK- Alaska PROD -ANCPl Survey MD Inc All (azimuth) ND TVDSS WS EIW Northing Easgng DLeg V. Sec (usft) 0 (°) (usft) (usft) (usft) (usft) (usft) (usft) (*1100us(t) (usft) 4,700.55 24.77 210.29 4,662.89 4,601.06 -241.59 -111.98 5,960,305.040 664,033.327 2.20 22.84 4,800.55 25.63 210.00 4,753.38 4,691.55 -278.41 -133.36 5,960,267.764 664,012.758 0.87 22.58 4,900.55 26.13 209.89 4,843.35 4,781.52 -316.23 -155.15 5,960,229.478 663,991.803 0.50 22.46 5,000.55 26.37 209.89 4,933.03 4,871.20 -354.58 -177.19 5,960,190.663 663,970.606 0.24 22.38 5,100.55 26.10 209.79 5,022.73 4,960.90 -392.92 -199.19 5,960,151.850 663,949455 0.27 22.35 5,200.55 26.38 209.69 5,112.43 5,050.60 431.31 -221.12 5,960,112.993 663,928.367 0.28 22.38 5,300.55 26.72 210.60 5,201.88 5,140.05 469.96 -243.57 5,960,073.864 663,906.771 0.53 22.11 5,400.55 27.08 210.89 5,291.06 5,229.23 -508.85 -266.70 5,960,034487 663,884.497 0.38 21.35 5,500.55 27.80 211.50 5,379.81 5,317.98 -548.28 -290.57 5,959,994.561 663,861.495 0.77 20.22 5,600.55 29.05 212.60 5,467.75 5,405.92 -588.60 -315.84 5,959,953883 663,837.118 1.36 18.33 5,700.55 28.97 212.69 5,555.21 5,493.38 -629.44 -342.00 5,959,912289 663,811.857 0.09 15.92 5,800.55 29.10 213.00 5,642.64 5,580.81 -670.21 -368.32 5,959,870.951 663,786.432 0.20 13.33 5,900.55 29.17 212.79 5,729.99 5,668.16 -711.09 -394.76 5,959,829.505 663,760.892 0.12 10.69 6,000.55 28.70 213.19 5,817.50 5,755.67 -75187 421.10 5,959,788.361 663,735.444 0.51 7.99 6,100.55 29.22 213.19 5,905.00 5,843.17 -792.19 -447.61 5,959,747.274 663,709.831 0.52 5.12 6,200.55 29.47 212.50 5,992.17 5,930.34 -833.37 474.19 5,959,705.534 663,684.160 0.42 2.51 6,300.55 29.38 213.00 6,079.27 6,017.44 -874.69 -500.76 5,959,663.647 663,658.494 0.26 -0.03 6,400.55 29.28 213.00 6,166.45 6,104.62 -915.77 -527.44 5,959,621.996 663,632.721 0.10 -2.77 6,500.55 29.03 213.00 6,253.78 6,191.95 -956.62 -553.98 5,959,580.571 663,607.088 0.25 -5.50. 6,600.55 28.43 213.60 6,341.47 6,279.64 -996.80 -580.36 5,959,539.831 663,581.586 0.67 -8.44 6,700.55 28.05 213.69 6,429.57 6,367.74 -1,036.19 -606.58 5,959,499.880 663,556.239 0.38 -11.62 6,800.55 27.22 214.00 6,518.16 6,456.33 -1,074.72 -632.41 5,959,460.803 663,531.257 0.84 -14.90 6,900.55 27.75 213.29 6,606.87 6,545.04 -1,113.14 -657.98 5,959,421.835 663,506.536 082 -18.00 7,000.55 30.27 213.89 6,694.32 6,632.49 -1,153.53 -684.81 5,959,380.873 663,480.590 2.54 -21.22 7,100.55 32.98 214.39 6,779.46 6,717.63 -1,196.92 -714.25 5,959,336.853 663,452.115 2.72 -25.21 7,200.55 34.03 214.19 6,862.84 6,801.01 -1,242.52 -745.34 5,959,290.561 663,422.023 1.06 -29.54 7,300.55 33.28 214.19 6,946.08 6,884.25 -1,288.36 -776.49 5,959,244.074 663,391.892 0.75 -33.79 6/1912017 5:55:17PM Page 5 COMPASS 5000.1 Build 81D r4 by BP FORM ry4,'f Final Survey Report BMW HUGHES Company: North America - ALASKA -BP Local Co-ordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: C-11A @ 61 .83usft (Nabors 2ES) Site: PB C Pad MD Reference C-11A @ 61.83usft (Nabors 2ES) Well: C-11 North Reference: True Wellbore: C-11B Survey Calculation Method; Minimum Curvature Design: C-11B Database: EDM RSK- Alaska PROD -ANCP1 Survey_ MD Inc Azi(azimuth) TVD TVOSS WS ENV Northing Easang OLeg V. Sec (usft) (°) (°) (usft) lusft) (usft) (usft) (usft) (usft) (°/100ustq (usft) 1 7,400.55 32.47 214.60 7,030.07 6,988.24 -1,333.16 -807.15 5,959,198.627 663,362.219 0.84 -38.14 7,500.55 31.73 214.29 7,114.78 7,052.95 -1,376.98 -837.20 5,959,154.162 663,333.127 0.76 -42.46 7,600.55 31.15 214.69 7,200.10 7,138.27 -1,419.97 -886.74 5,959,110.538 663,304.540 0.62 -46.73 7,700.55 31.32 215.19 7,285.60 7,223.77 -1,462.48 -896.44 5,959,067.395 663,275.780 0.31 -51.38 7,800.55 32.32 214.69 7,370.57 7,308.74 -1,505.70 -928.63 5,959,023.526 663,246.539 1.03 -56.11 7,900.55 33.65 208.69 7,454.47 7,392.64 -1,552.00 -955.16 5,958,978.618 663,219.035 3.53 -57.87 8,000.55 35.92 208.29 7,536.60 7,474.77 -1,602.14 -982.36 5,958,925.899 663,192.933 2.28 -56.57 8,100.55 38.38 209.79 7,616.30 7,554.47 -1,654.92 -1,011.69 5,958,872.495 663,164.764 2.62 -55.80 8,193.00 41.47 210.35 7,687.19 7,625.36 -1,706.26 -1,041.43 5,958,820.525 663,136.161 3.36 -56.10 8,219.07 40.47 212.14 7,706.87 7,645.04 -1,720.87 -1,050.29 5,958,805.722 683,127.620 5.91 -56.53 8,311.62 I 36.56 219.33 7,779.31 7,717.48 -1,787.66 -1,083.77 5,958,758.210 663,095.174 6.42 -62.33 8,404.30 32.07 228.09 7,855.89 7,794.06 -1,805.49 -1,119.61 5,958,719.610 663,060.166 7.19 -74.65 8,498.34 27.09 229.59 7,937.65 7,875.82 -1,836.07 -1,154.52 5,958,688.281 663,025.939 5.35 -89.75 8,591.07 25.60 230.09 8,020.74 7,958.91 -1,862.61 -1,185.96 5,958,661.060 662,995.083 1.62 -103.85 8,685.11 25.00 226.45 8,105.77 8,043.94 -1,889.34 -1,215.95 5,958,633.685 662,965.688 1.77 -116.80 _ 8,777.86 24.58 223.20 8,189.79 8,127.96 -1,916.85 -1,243.30 5,958,605.589 662,938.945 1.54 -126.67 8,871.50 24.21 219.11 8,275.26 8,213.43 -1,946.01 -1,268.80 5,958,575.882 662,914.090 1.84 -134.31 8,951.19 23.16 218.33 8,348.24 8,286.41 -1,970.98 -1,288.83 5,958,550.479 662,894.614 1.37 -139.29 9,062.76 22.44 212.32 8,451.10 8,389.27 -2,006.19 -1,313.83 5,958,514.733 662,870.395 2.18 -143.49 9,098.25 22.36 210.09 8,483.92 8,422.09 -2,017.76 -1,320.83 5,958,503.018 662,863.644 2.40 -143.82 9,126.00 19.06 208.22 8,509.87 8,448.04 -2,026.32 -1,325.62 5,958,494.354 662,859.042 12.13 -143.72 9,157.34 16.45 190.85 8,539.74 8,477.91 -2,035.19 -1,328.88 5,958,485.411 662,855.979 18.75 -142.14 9,191.53 12.90 173.98 8,572.82 8,510.99 -2,043.75 -1,329.39 5,958,476.846 662,855.655 16.15 -138.34 9,222.98 15.97 154.54 8,603.29 8,541.46 -2,051.15 -1,327.16 5,958,469.493 662,858.046 18.11 -132.72 9,251.63 20.09 142.52 8,630.54 8,568.71 -2,058.62 -1,322.47 5,958,462.129 662,862.899 19.31 -124.94 9,285.05 20.80 136.00 8,661.86 8,600.03 -2,067.45 -1,314.85 5,958,453.473 662,870.706 7.13 -113.95 9,317.78 20.87 132.89 8,692.45 8,630.62 -2,075.59 -1,306.55 5,958,445.509 662,879.189 3.39 -102.69 61192017 5:55:17PM Page 6 COMPASS 5000.1 Build 81D "11411, BP FrA Z pFinal Survey Report BMW UGGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: weIIC-11 Project: Prudhoe Bey TVD Reference: C -11A @ 61.83usft (Nabors 2ES) Site: PB C Pad MD Reference: C -11A @ 61.83usft (Nabors 2ES) Well: C-11 North Reference: True Wellbore: C -11B Survey Calculation Method: Minimum Curvature Design: C -11B Database: EDM RSK-Alaska PROD -ANCP1 Survey MD Inc Azl (azimuth) TVD 7VDSS NIS EM Nothing Easting Dl -eq V. Sac 1 [usft) PI 0 (usft) (usft) ryslt) (usft) (usft) (usft) ("I1001 (usft) �. 9,346.80 20.91 133.87 8,719.56 8,657.73 -2,082.70 -1,299.03 5,958,438.568 662,886863 1.21 -92.63 9,379.60 1 24.75 133.27 8,749.78 8,687.95 -2,091.47 -1,289.80 5,958,430.007 662,896.274 11.73 -80.27 9,409.68 27.23 129.23 8,776.82 8,714.99 -2,100.14 -1,279.88 5,958,421.556 662,906.378 10.13 -67.36 9,439.94 31.01 123.04 8,803.26 8,741.43 -2,108.77 -1,267.98 5,958,413.185 662,918.467 15.96 -52.73 9,473.57 36.42 116.51 8,831.23 8,769.40 -2,117.96 -1,251.77 5,958,404.353 662,934.876 19.34 -34.10 9,504.50 38.25 110.47 8,855.83 8,794.00 -2,125.41 -1,234.57 5,958,397.281 662,952.226 13.23 -15.48 9,533.09 40.69 105.73 8,877.91 8,816.08 -2,131.03 -1,217.31 5,958,392.036 662,969.612 13.56 2.30 9,566.78 44.89 101.05 8,902.63 8,840.80 -2,136.29 -1,195.05 5,958,387.264 662,991.975 15.63 24.23 9,596.81 48.42 95.18 8,923.25 8,861.42 -2,139.34 -1,173.45 5,958,384.689 663,013.638 18.44 44.49 9,625.11 52.12 93.48 8,941.33 8,879.50 -2,140.97 -1,151.75 5,958,383.530 663,035.365 13.87 64.14 9,658.21 54.75 91.75 8,961.05 8,899.22 -2,142.18 -1,125.20 5,958,382.904 663,061.937 8.99 87.78 9,688.99 58.87 88.78 8,977.90 8,916.07 -2,142.28 -1,099.45 5,958,383.363 663,087.679 15.63 110.18 9,717.79 65.57 87.98 8,991.32 8,929.49 •2,141.56 -1,073.99 5,958,384.644 663,113.111 23.39 131.91 9,751.69 71.14 89.83 9,003.82 8,941.99 -2,140.97 -1,042.50 5,958,385.924 663,144.578 17.19 158.94 9,783.17 77.56 88.98 9,012.30 8,950.47 -2,140.65 -1,012.21 5,958,386.904 663,174.857 20.56 185.08 -_ 9,811.38 84.25 86.35 9,016.76 8,954.93 -2,139.51 -984.39 5,958,388.651 663,202.837 25.44 208.65 9,843.05 89.20 83.48 9,018.57 8,956.74 -2,136.71 -952.91 5,958,392.141 663,234.047 18.06 234.57 9,905.04 87.28 83.14 9,020.47 8,958.64 -2,129.49 -891.38 5,958,400.700 663,295.406 3.15 284.39 9,953.46 91.48 83.14 9,021.00 8,959.17 -2,123.71 -843.32 5,958,407.530 663,343.325 8.67 323.23 10,029.05 89.01 82.65 9,020.68 8,958.85 -2,114.36 -768.32 5,958,418.514 663,418.100 3.33 383.68 10,060.02 88.40 81.86 9,021.38 8,959.55 -2,110.18 -737.64 5,958,423.355 663,448.679 3.22 408.23 10,091.09 89.75 82.67 9,021.88 8,960.05 -2,106.00 -706.85 5,958,428.207 663,479.361 5.07 432.87 10,133.26 93.40 81.52 9,020.72 8,958.89 -2,100.21 -665.11 5,958,434.913 663,520.967 9.07 466.21 10,183.25 94.02 81.06 9,017.48 8,955.65 -2,092.65 -615.80 5,958,443.542 663,570.096 1.54 505.26 10,230.86 93.64 81.54 9,014.30 8,952.47 -2,085.47 -568.84 5,958,451.751 663,616.882 1.28 542.441 10,278.48 88.83 79.79 9,013.28 8,951.45 -2,077.75 -521.88 5,958,460.495 663,663.662 10.75 579.361 10,372.66 88.64 80.19 9,015.36 8,953.53 -2,061.38 -429.16 5,958,478.881 663,755.999 0.47 651.70) 6/19/2017 5:55:17PM Page 7 COMPASS 5000.1 Build 81D by BP SRIMERRIMERER Final Survey Report HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-11 Wellbore: C -11B Design: C -11B Survey Well C-11 MD Inc C -11A @ 61.83usft (Nabors 2ES) (usft) (°) C -11A@ 61.83usft(Nabors 2ES) 10,463.03 91.05 10,481.00 90.59 Top of Whipstock EDM R5K- Alaska PROD - ANCP1 10,508.20 93.66 Interpolated azimuth 79.90 9,015.34 10,539.81 94.98 Interpolated azimuth 663,862.141 4.07 10,569.04 91.32 Interpolated azimuth 5,958,514.351 10,600.90 87.02 Interpolated azimuth 86.12 10,531.06 88.18 Interpolated azimuth -203.78 10,641.08 69.26 First clean survey 830.47 10,666.06 90.25 10,691.08 87.66 10,737.72 87.60 10,766.10 87.24 10,791.47 87.02 10,821.18 88.19 10,85L51 68.40 10,876.30 86.87 10,911.13 87.94 10,940.69 89.91 10,971.22 93.93 10,995.56 94.51 11,020.94 90.80 Local Coordinate Reference: Well C-11 TVD Reference: C -11A @ 61.83usft (Nabors 2ES) MD Reference: C -11A@ 61.83usft(Nabors 2ES) North Reference: True Survey Calculation Method; Minimum Curvature Database: EDM R5K- Alaska PROD - ANCP1 Azi (azimuth) TVD TVDSS NIS EN Northing Easting DLag (°) (usft) (usft) (usft) (usft) (usft) lust) (°I100usft) 79.33 9,015.60 8,953.77 -2,045.32 -340.23 5,958,496.882 663,844.544 2.83 79.90 9,015.34 8,953.51 -2,042.08 -322.56 5,958,500.506 663,862.141 4.07 V. Sec 1 (usft) 720.89 734 62 81.31 9,014.33 8,952.50 -2,037.64 -295.75 5,958,505.525 663,888.849 12.40 755.68 82.95 9,011.95 8,950.12 -2,033.33 -264.52 5,958,510.521 663,919.967 6.64 780.64 84.47 9,010.35 8,948.52 -2,030.13 -235.52 5,958,514.351 663,948.892 13.55 804.22 86.12 9,010.81 8,948.96 -2,027.52 -203.78 5,958,517.658 663,980.566 14.48 830.47 87.68 9,012.07 8,950.24 -2,025.89 -173.69 5,958,519.944 664,010.609 6.45 855.77 88.20 9,012.29 8,950.46 -2,025.53 -163.88 5,958,520.523 664,020.609 11.96 86428 93.88 9,012.40 8,950.57 -2,025.98 -138.72 5,958,520.815 664,045.578 23.08 886.17 95.10 9,012.86 8,951.03 -2,027.94 -113.78 5,958,519.202 664,070.548 11.44 908.78 101.97 9,014.79 8,952.96 -2,034.85 -67.72 5,958,513.298 664,116.741 14.72 952.19 105.68 9,016.07 8,954.24 -2,041.62 -40.20 5,958,507.128 664,144406 13.12 979.44 108.33 9,017.34 8,955.51 -2,049.03 -15.97 5,958,500.250 664,168.788 10.47 1,004.15 111.24 9,018.58 8,956.75 -2,059.08 11.96 5,958,490.816 664,196.927 10.55 1,033.38 115.31 9,019.48 8,957.65 -2,071.06 39.80 5,958,479.451 664,225.024 13.43 1,063.49 118.03 9,020.50 8,958.67 -2,082.17 61.93 5,958,468.822 664,247.391 12.58 1,088.22 121.58 9,022.08 8,960.25 -2,099.46 92.12 5,958,452.195 664,277.945 10.64 1,123.01 124.74 9,022.64 8,960.81 .-2,115.63 116.86 5,958,436.577 664,303.028 12.60 1,152.51 129.57 9,021.61 8,959.78 -2,134.05 141.16 5,958,418.695 664,327.730 20.57 1,182.75 128.86 9,019.82 8,957.99 -2,149.39 159.97 5,958,403.764 664,346.867 3.76 1,208.70 125.40 9,018.65 8,956.82 -2,164.69 180.18 5,958,388.912 664,367.401 19.98 1,231.83 6/192017 5:55:17PM Page 8 COMPASS 5000.1 Build 81D BP pFinal Survey Report BAKER HUGHES Company: North America -ALASKA -BP Local Coordinate Reference: Well C-11 Project: Prudhoe Bay ND Reference: C -11A @ 61.83usft (Nabors 2ES) Site: P8 C Pad MD Reference: C -11A Q 61.83usft (Nabors 2ES) Well: C-11 North Reference: True Wellbors: C -11B Survey Calculation Method: Minimum Curvature Design: C -11B Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (uhnuth) ND TVDSS NIS ENV Northing Esstbrg DL69 V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 11,051.36 91.01 123.83 9,018.17 8,956.34 -2,181.97 205.21 5,958,372.186 664,392.802 5.21 1,262.14 11,083.41 89.45 121.78 9,018.04 8,956.21 -2,199.33 232.15 5,958,355.417 664,420.110 8.04 1,294.15 11,116.43 89.57 119.27 9,018.32 8,956.49 -2,218.10 260.59 5,958,339.274 664,448.907 7.61 1,327.16 11,146.43 90.18 116.61 9,018.39 6,956.56 -2,230.15 287.09 5,958,325.803 664,475.707 9.10 1,357.14 11,177.90 92.67 116.12 9,017.60 8,955.77 -2,244.12 315.27 5,958,312.452 664,504.189 8.06 1,388.54 11,211.38 90.68 113.82 9,016.62 8,954.79 -2,258.25 345.61 5,958,298.994 864,534.822 9.08 1,421.88 11,241.08 89.08 117.24 9,016.69 8,954.86 -2,271.05 372.40 5,958,286.785 664,561.889 12.71 1,451.50 11,270.51 89.02 119.92 9,017.17 8,955.34 -2,285.12 398.24 5,958,273.278 664,568.026 9.11 1,480.91 11,296.01 89.11 120.62 9,017.59 8,955.76 -2,297.98 420.26 5,958,260.911 664,610.320 2.77 1,506.41 11,325.64 90.77 119.98 9,017.62 8,955.79 -2,312.92 445.84 5,958,246.526 664,636.220 6.00 1,536.04 11,351.10 89.85 116.83 9,017.48 8,955.65 -2,325.03 468.23 5,958,234.909 664,658.869 12.89 1,561.49 11,364.36 88.99 115.76 9,017.82 8,955.99 -2,339.77 498.05 5,958,220.832 664,688.998 4.13 1,594.68 11,410.68 88.25 114.78 9,018.45 8,956.62 -2,351.00 521.84 5,958,210.123 664,713.030 4.66 1,620.91 11,440.65 90.21 112.87 9,018.86 8,957.03 -2,363.10 549.25 5,958,198.621 654,740.697 9.13 1,650.71 11,471.34 90.77 112.49 9,018.59 8,956.76 -2,374.94 577.57 5,958,187.410 664,769.262 2.21 1,681.17 11,506.04 93.17 111.36 9,017.40 8,955.57 -2,387.88 609.74 5,958,175.169 664,801.703 7.64 1,715.52 11,536.84 91.72 111.22 9,016.09 8,954.26 -2,399.06 638.41 5,958,164.626 664,830.610 4.73 1,745.95 11,556.68 90.55 109.39 9,015.69 8,953.86 -2,405.94 657.01 5,958,158.151 664,649.357 10.95 1,765.51 11,583.11 89.88 105.92 9,015.60 8,953.77 -2,413.95 882.19 5,958,150.689 664,874.705 13.37 1,791.35 11,608.32 88.99 101.70 9,015.84 8,954.01 -2,419.97 706.67 5,958,145.210 664,899.303 17.11 1,815.58 11,644.61 86.66 98.30 9,017.22 8,955.39 -2,426.27 742.37 5,958,139.695 664,935.135 11.35 1,849.69 11,672.04 1 86.44 96.75 9,018.87 8,957.04 -2,429.85 769.52 5,958,136.703 664,962.348 5.70 1,875.03 11,701.77 86.93 95.55 9,020.59 8,958.78 -2,433.03 799.02 5,958,134.169 664,991.918 4.35 1,902.22 11,731.76 89.54 93.83 9,021.52 8,959.69 -2,435.48 828.90 5,958,132.372 665,021.834 10.42 1,929.36 11,766.74 Willi 91.24 9,021.69 8,959.86 -2,437.03 863.84 5,958,131.589 665,056.799 7.47 1,960.45 11,791.52 89.17 88.90 9,021.90 8,960.07 -2,437.06 888.62 5,958,132.099 665,081.569 9.87 1,981.97 11,822.11 89.82 86.55 9,022.17 8,960.34 -2,435.85 919.18 5,958,133.981 665,112.096 7.97 2,007.89 6119@017 5:55:17PM Page 9 COMPASS 5000.1 Build 81D by Final Surveey Report RIMER•• HUGHES Company: NOM America - ALASKA -BP Local Co-ordinate Reference: Well C-11 Project: Prudhoe Bay ND Reference: CAIAG 61.83usft(Nabors 2ES) Site: PBCPad MD Reference: C-11A a 61.83usft(Nabors 2ES) Well: C-11 North Reference: True Wellbore: C-11B Survey Calculation Method: Minimum Curvature Design: C-11B Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Aid (azimuRl) ND NDSB NIS ENV Northing Basting D1.e9 V. a" (usR) (•) (y (usR) (usR) (usR) (usfy (usR( (usR) (•1100usR) (usR 11,851.77 91.32 84.71 9,021.87 8,960.04 -2,433.59 948.75 5,958,136.886 665,141.607 8.00 2,032.43 11,880.48 91.26 81.24 9,021.23 8,959.40 -2,430.08 977.23 5,958,141.016 665,170.005 12.09 2,055.41 11,911.86 90.86 77.27 9,020.65 8,958.82 -2,424.23 1,008.05 5,958,147.536 665,200.686 12.71 2,079.25 11,940.52 90.22 74.13 9,020.38 8,958.55 -2,417.15 1,035.82 5,958,155.218 665,228.290 11.18 2,099.83 11,970.44 90.92 69.44 9,020.08 8,958.25 -2,407.80 1,064.23 5,958,165.185 665,256.488 15.85 2,119.84 12,005.00 90.31 63.73 9,019.71 8,957.88 -2,394.07 1,095.93 5,958,179.600 665,287.877 16.61 2,140.53 12,030.24 90.68 58.50 9,019.49 8,957.66 -2,381.89 1,118.02 5,958,192.267 665,309.696 2077 2,153.65 12,060.23 92.12 56.51 9,018.76 8,956.93 -2,365.78 1,143.30 5,958,208.919 665,334.622 6.19 2,167.59 12,091.88 89.85 50.28 9,018.21 8,956.38 -2,346.92 1,168.69 5,958,228.328 665,359.591 20.95 2,180.26 12,120.40 88.06 45.04 9,018.73 8,956.90 -2,327.72 1,189.76 5,958,247.980 665,380.235 19.41 2,189.00 12,156.64 88.34 39.03 9,019.87 8,958.04 -2,300.83 1,214.00 5,958,275.393 665,403.882 16.59 2,196.68 12,181.11 88.71 35.36 9,020.50 8,958.67 -2,281.35 1,228.79 5,958,295.192 665,418.238 15.07 2,199.83 12,210.69 88.37 30.91 9,021.25 8,959.42 -2,256.69 1,244.95 5,958,320.293 665,433.852 15.08 2,201.56 12,241.96 88.00 25.96 9,022.25 6,950.42 -2,229.12 1,259.83 5,958,348.084 665,448.124 15.87 2,200.82 12,271.41 91.78 23.64 9,022.30 8,960.47 -2,202.39 1,272.18 5,958,375.073 665,459.887 15.06 2,198.26 12,305.91 92.12 21.49 9,021.13 8,959.30 -2,170.55 1,285.41 5,958,407.191 665,472.418 6.31 2,193.92 12,330.61 91.29 23.14 9,020.39 8,958.56 -2,147.71 1,294.78 5,958,430.228 665,481.290 7.48 2,190.71 12,360.60 90.03 26.14 9,020.05 8,958.22 -2,120.46 1,307.28 5,958,457.746 665,493.192 10.85 2,188.02 12,390.90 90.46 29.35 9,019.92 8,958.09 -2,093.65 1,321.39 5,958,484.858 665,506.705 10.69 2,186.94 12,422.45 92.43 32.81 9,019.12 8,957.29 -2,066.64 1,337.66 5,958,512.213 665,522.389 12.62 2,187.65 12,451.44 91.99 36.07 9,018.00 8,956.17 -2,042.75 1,354.04 5,958,536.451 665,538.243 11.34 2,190.00 12,480.80 92.18 39.50 9,016.94 8,955.11 -2,019.57 1,372.02 5,958,560.021 665,555.705 11.69 2,194.08 12,510.68 91.38 43.33 9,016.01 8,954.18 -1,997.17 1,391.77 5,958,582.838 665,574.963 13.09 2,200.09 12,540.94 91.29 45.58 9,015.30 8,953.47 -1,975.58 1,412.95 5,958,604.690 665,595.666 7.37 2,207.75 12,570.62 91.63 49.41 9,014.55 8,952.72 -1,955.53 1,434.82 5,958,625.409 665.617.088 13.02 2,216.76 12,600.88 90.71 51.63 9,013.93 8,952.10 -1,936.30 1,458.17 5,958,645.147 665,640.010 7.94 2,227.47 12,630.51 91.10 48.87 9,013.46 8,951.63 -1,917.36 1,480.94 5,958,664.581 665,662.365 9.41 2,237.83 6/19/2017 5:55'17PM Page 10 COMPASS 50001 Build 81D :'' by BP Azi (azimuth) F�be %N Final Survey Report ENV BAKER Easling DLeg V. Sac HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-11 lusR) Project: Prudhoe Bay TVD Reference: C -11A @ 61.83usft (Nabors 2ES) (usR) She: PBCPad MD Reference: C -11A @ 61.83usft(Nabors 2ES) Well: C-11 North Reference: True 9,013.05 Wellbore: C-118 Survey Calculation Method: Minimum Curvature 5,958,685.195 Design: C -11B Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easling DLeg V. Sac (usft) (°) 0 lusR) (usR) (usft) (usR ) (usR) (usft) (°1700usR) lusR) 12,660.07 90.49 45.16 9,013.05 8,951.22 -1,897.21 1,502.56 5,958,685.195 665,683.536 12.72 2,246.58., 12,690.83 89.23 42.86 9,013.12 8,951.29 -1,875.09 1,523.93 5,958,707.776 665,704.416 8.53 2,254.13 12,720.88 89.57 40.90 9,013.44 8,951.61 -1,852.71 1,543.99 5,958,730.579 665,723.980 6.62 2,260.43 12,750.61 88.89 39.31 9,013.84 8,952.01 -1,829.98 1,563.14 5,958,753.727 665,742.627 5.82 2,265.75 12,780.22 87.73 35.32 9,014.71 8,952.88 -1,806.44 1,581.08 5,958,777.645 665,760.045 14.03 2,269.62 12,810.59 88.34 32.70 9,015.75 8,953.92 -1,781.29 1,598.05 5,958,803.166 665,776.466 8.85 2,271.86 12,840.30 89.42 32.54 9,016.33 8,954.50 -1,756.27 1,614.07 5,958,828.526 665,791.927 3.67 2,273.32 12,871.19 89.45 35.56 9,016.64 8,954.81 -1,730.68 1,631.36 5,958,854.486 665,808.655 9.78 2,275.62 12,902.59 89.20 37.92 9,017.01 8,955.18 -1,705.52 1,650.14 5,958,880.047 665,826.881 7.56 2,279.42 12,929.92 90.98 40.48 9,016.97 8,955.14 -1,684.34 1,667.41 5,958,901.595 665,843.684 11.41 2,283.88 12,965.82 92.54 42.35 9,015.86 8,954.03 -1,657.43 1,691.14 5,958,929.013 665,866.824 6.78 2,291.11 12,991.40 92.40 44.85 9,014.76 8,952.93 -1,638.93 1,708.77 5,958,947.898 665,884.037 9.78 2,297.21 13,020.47 91.14 51.15 9,013.86 8,952.03 -1,619.50 1,730.35 5,958,967.795 665,905.188 22.09 2,306.29 13,055.26 90.15 56.17 9,013.47 8,951.64 -1,598.89 1,758.38 5,958,989.008 665,932.742 14.71 2,320.36 13,080.85 89.23 58.48 9,013.61 8,951.78 -1,585.08 1,779.90 5,959,003.288 665,953.972 9.72 2,332.19 _ 13,110.82 89.17 62.15 9,014.03 8,952.20 -1,570.24 1,605.93 5,959,018.890 665,979.670 12.25 2,347.41 13,140.98 89.75 64.90 9,014.31 8,952.48 -1,556.79 1,832.92 5,959,032.719 666,006.381 9.32 2,364.16 13,170.80 89.57 62.62 9,014.49 8,952.66 -1,543.61 1,859.67 5,959,046.482 666,032.809 7.67 2,380.82 13,200.85 89.57 62.18 9,014.71 8,952.88 -1,529.69 1,888.30 5,959,060.981 666,059.127 1.46 2,397.01 13,231.52 90.52 59.82 9,014.69 8,952.86 -1,514.82 1,913.12 5,959,076.430 686,085.616 8.29 2,412.90 13,263.46 91.32 59.19 9,014.18 8,952.35 -1,498.61 1,940.64 5,959,093.232 666,112.772 3.19 2,428.73 13,290.72 88.28 54.30 9,014.27 8,952.44 -1,483.67 1,963.42 5,959,108.668 666,135.225 21.12 2,441.08 13,324.15 90.18 53.18 9,014.72 8,952.89 -1,463.90 1,990.38 5,959,129.019 666,161.736 6.60 2,454.65 13,350.09 91.07 51.81 9,014.44 8,952.61 -1,448.11 2,010.95 5,959,145.255 666,181.961 6.30 2,464.66 13,380.50 91.20 50.28 9,013.84 8,952.01 -1,429.00 2,034.60 5,959,164.881 666,205.179 5.05 2,475.69 13,391.16 90.18 _ 48.49 9,013.71 8,951.88 -1,422.06 2,042.69 5,959,171.994 666,213.116 19.33 2,479.26 6119/2017 5.55.17PM Page 11 COMPASS 5000.1 Build 61D )b Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-11 Wellbore: C -11B Design: C -11B Survey MD (usft) 13,432.00 — Projection to TO Design Annotations Measured Depth (usft) 10,481.00 10,508.20 10,539.81 10,569.04 10,600.90 10,631.06 10,641.08 13,432.00 Inc Aid(azlmuth) (1) (1) 98.18 48.49 Vertical Depth (usR) 9,015.34 9,014.33 9,011.95 9,010.35 9,010.81 9,012.07 9,012.29 9,013.58 BP +N/ -S //... Final Survey Report (usft) (usft) BAKER -2,042.08 -322.56 Top of Whipstock HUGHES -295.75 Local Co-ordinate Reference: Well C-11 -264.52 Interpolated azimuth TVD Reference: C -11A @ 61.83usft (Nabors 2ES) Interpolated azimuth -2,027.52 MD Reference: C -11A @ 61.83usft(Nabors 2ES) -2,025.89 -173.69 North Reference: True -163.68 First clean survey Survey Calculation Method: Minimum Curvature Projection to TO Database: EDM R5K- Alaska PROD - ANCP1 TVD TVDSS N/S ENV Northing Easting DLep V. See (usft) (usft) (usft) (usft) (usft) (usft) (°1100esft) (ueR) 9,013.58 8,951.75 -1,394.99 2,073.27 5,959,199.720 666,243.098 0.00 2,492.35] Local Coordinates +N/ -S +E/ -W (usft) (usft) Comment -2,042.08 -322.56 Top of Whipstock -2,037.64 -295.75 Interpolated azimuth -2,033.33 -264.52 Interpolated azimuth -2,030.13 -235.52 Interpolated azimuth -2,027.52 -203.78 Interpolated azimuth -2,025.89 -173.69 Interpolated azimuth -2,025.53 -163.68 First clean survey -1,394.99 2,073.27 Projection to TO Prepared By: Jose Vazquez - Tech Support Engineer 6/192017 5:55:17PM Page 12 COMPASS 5000 1 Build 81D Pm)e0h ftdho6Bay 916: P8C Pal Wall: C-01 Obpl: Welh6n: C11B Plan: 40118 W P09 (C -111C-118) POST DRILLING MAP .a BAKER HUGHES ,� • "^^m•eTu �* uwr.rr fOxp.519i19n WELLBOREDUAItS: C-118 Bsm5x INFMWl C -11B M1 it T.4N VnSaljNpl Belaema. G11A@81a INba M) O6asm:elnl ae avm' Perenl Wellbe,aumm6mIN�118eN— C -11A seem Ns)aelmam: SM-IOWN,U% gg Easting (200 usNim) gg 8 g OG2NC-20o 9wN6ix+.wl eie,Me: Te on MD: 10483.03 py®,am c1u®64e]usfi 1x20202551 - ffi cvounanwmme: N99rem cmrewre POST DRILLING MAP .a BAKER HUGHES /BOO GCC Report c 8 g gg 0-1 8 gg Easting (200 usNim) gg 8 g OG2NC-20o 'g �G131C-13A ffi g s5961596120016 � - C -351C -35o IG040 -ONC-018 9 mine GOBIGOSA 5881000 CJ9C-35B 5 gpp0 ? C-13IG-13 5951000 5950800 9 6000 Blj1 C-34IC-34 SBfi08% GMC -39A 5960600 � G1NC-t5q 1A1 ('0g1.PIeYlc-Oi �y11 I �2MC-39APB1 5960600 5980 es $ 0 4 000 `_'^�^ $ 0 0 G15IG15o 00 5960400 Sesame $ p 5BBOm0 Op 4 $ 5%0000 O � 5950000 0 000 C-39IG39 5959800 Po $ 0-21IC-21A 2VC-21 O 391C-39PB1 NS9800 595mo0 N� W0 I 0 08 0 0 0 0 59598% 595B40o �Oo �0 C4IC- o SMC -02A 5000 5000 ' 6 -902500 0 59594% m $O m� C -111C -11B 5959200 G22IC-22Ap00 y yz 59592%$ 0 955959000 2 22 6p00 5859000 g 9 3 30 O 5958600 z -01A yy 5%8800 S ' 595%00 O o .9 5958800 O ifA b SBS8400 X000 �0 0 5958400 5958200 3C o 0 0 �0 5958200 5956000 8000 -IM -30 $1 5958000 C-iNG19G l 0 595]800 ;) 100 B ]000 585]800 5951600 C-11IC-11 000 5957600 C-09 5957400 8000 C-1V612CPB 595]400 59S]m0 9000 -2 0 -2�e %12IC-12 PB1 10 5957200 8000 g00 S9S]0% $ C-09IC-09A C 2IC-1 A 90 C-OWC-D9BPB �0 -101C-108 6 C -121C -12B y y.-921 W57000 C -oft 09B C -t OIG10 .dq DIC -10A sa E Y Y Y & $g g g —z o e e o e o o e o e e o 0 o e o g o g e e S o o e o 0 e o e o o e a Fa61in9(200 uaNin) /BOO GCC Report North America - ALASKA - BP Prudhoe Bay PB C Pad C-11 C-11 B C-11 B AOGCC POST Drilling Offset Well Report 22 June, 2017 riFag BAKER HUGHES AOOGCC Report BP ~� by Travelling Cylinder Report BAKER R•■ %w HUGHES Company: North America -ALASKA -BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00 usft Reference Well: C-11 Well Error: 0.00 usft Reference Wellbore C -11B Reference Design: C -11B Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well C-11 011A @ 61.83usft (Nabors 2ES) C -11A (8J 61.83usft (Nabors 2ES) True Minimum Curvature 1.00 sigma EDM RSK- Alaska PROD - ANCP1 Onset Datum Reference C-1 1B Filter type: NO GLOBAL FILTER: Using user defined selection 8 filtering cntena WARNING: There is hidden tight data in this project Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scam Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00 usft Error Surface: Elliptical Conic Survey Progrn1 Date 6/22/2017 From To Offset Centre to (usft) (usft) Survey (Wellbore) Tool Name Description 100.55 8,100.55 C-11 Srvy 1 BOSS -MS (C-11) BOSS -GYRO Sperry -Sun BOSS gyro multishot 8,193.00 10,463.03 C -11A Srvy1 MWD+FIR+MS(C-11A) MWD+IFR+MS-WOCA MWD+IFR +Multi Station W/O Crustal 10,481.00 13,432.00 BHI CTK MM(C-11 B) MWD MWD -Standard J Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore- Design (usft) (usft) (usft) PB C Pad C-01 - C-01 - C-01 C-01 - C -01A- C -01A 12,241.19 10,059.00 349.03 C-01 - C-01 B- C-01 B C-01 - C-01 BPB1 - 001 BPB1 C-02. C -02A- C -02A C -04 -C -04-C-04 4,215.96 4,325.00 398.30 C-04 - C -04A - C -04A 4,208.05 4,325.00 397.16 C-04-C-04APBI-C-04APBt 4,208.05 4,325.00 397.16 C-04 - C-04APB2 - C-04APB2 4,208.05 4,325.00 397.16 C-04 - C-04APB3 - C-D4APB3 4,208.05 4,325.00 397.16 C-04 - C -04B - C -04B 4,208.05 4,325.00 397.16 C-04- C -04B- Plan #5 4,208.05 4,325.00 397.16 C-08 - C -0e - C-08 5,085.86 5,200.00 214.62 C-08 - C -08A - C -08A 5,079.92 5,200.00 213.84 C-08-C-08APB1-C-08APB1 5,079.92 5,200.00 213.84 C-08 - C -08B - C -08B 5,079.92 5,200.00 213.64 C-08 - C-08BPB1 - C-GBBP81 5,079.92 5,200.00 213.84 C-08 - C -08C - C -08C 5,079.92 5,200.00 213.84 C-08-C-0BCP61-C-08GPB1 5,079.92 5,200.00 213.84 C-08 - C-08CPB2 - C-08CPB2 5,079.92 5,200.00 213.84 C -09 -C -09-C-09 2,798.75 2,800.00 228.17 C-09 - C -09A - C -09A 2,798.75 2,800.00 228.17 C-09 - C -09B - C -09B 2,798.75 2,800.00 228.17 C-09 - C-09BPB1 - C-09BPBI 2,798.75 2,800.00 228.17 C-10 - C-10 - 010 2,824.83 2,825.00 119.07 CC - Min centre to 62V201710:18:25AM E� inOell ffiaaration Il COMPASS 5000.1 Build SID 11*10. BP FS &I = p a" Offset Travelling Cylinder Report BAKER Measured Measured Centre Site Name HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-11 (usft) Project: Prudhoe Bay TVD Reference: C-11A @ 61.83usft (Nabors 2ES) Reference Site: PBCPad MD Reference: C-11A@ 61.83usft(Nabom 2ES) C-10 - C -10B - C -10B Site Error: 0.00 usft North Reference: True 8,420.35 Reference Well: 611 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma 0.00 Reference Wellbore C-11B Database: EDM RSK- Alaska PROD -ANCP1 C -12 -C -12A -C -12A Reference Design: C-11B Offset TVD Reference: Offset Datum 2,271.76 Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) PB C Pad C-10 - C -10A- C -10A 2,824.48 2,825.00 119.07 C-10 - C -10B - C -10B 2,824.48 2,825.00 119.07 C-11 - 611 - C-11 8,420.35 8,425.00 30.24 C-11 - C -11A - C41A C-11 - C-11 B - G1I B M06 13,463.49 13,463.49 0.00 C -12 -C -12-C-12 2,271.76 2,275.00 97.53 C -12 -C -12A -C -12A 2,271.76 2,275.00 97.53 C-12-C-12APB1-C-12AP81 2,271.76 2,275.00 97.53 C -12 -C -12B -C -12B 2,271.76 2,275.00 97.53 C -12 -C -12C -612C 2,271.76 2,275.00 97.53 C-12-612CP81-C-12CPB1 2,271.76 2,275.00 97.53 C-13-613-CG73 3,096.39 3,100.00 188.98 C-1 3 - C-1 3A - C-1 3A 3,098.39 3,100.00 188.98 C -14-C-14-614 2,825.17 2,825.00 305.33 C-15 - C-15 - C-15 3,666.80 3,700.00 366.74 C -15-615A-61 SA 3,666.80 3,700.00 366.74 C -18-C-18-618 1,256.85 1,275.00 293.44 618 -C -18A -C-1 BA 1,256.85 1,275.00 293.44 C -18 -C -188-C-1 BB 1,256.85 1,275.00 293.44 C-18-C-18BPB7-618BPB1 1,256.85 1,275.00 293.44 C-19 - C-19 - C-19 3,719.36 3,750.00 185.25 C-19 - 619A- 619A 3,719.36 3,750.00 185.25 C-19 - 6198 - C-1 9B 3,719.36 3,750.00 185.25 C-19-C-19BP81-619BPB1 3,719.36 3,750.00 185.25 619 - C-1 9C - C-1 9C 4,250.25 4,275.00 151.03 619 - C-1 QC - Plan #6 619C approved 4,244.83 4,275.00 117.16 C-20 - C-20 - C-20 2,006.41 2,050.00 41.49 C-20 - C -20A - C -20A 2,013.32 2,050.00 41.65 C-20 - C -20B - C -20B 2,013.32 2,050.00 41.65 C-20 - C -20C - C -20C 2,013.32 2,050.00 41.65 C-21 - C-21 - C-21 4,975.41 4,925.00 190.17 621 -C -21A -621A 4,975.41 4,925.00 190.17 C-22 - C-22 - C-22 3,118.74 3,125.00 438.94 C-22 - C -22A - C -22A 3,123.78 3,125.00 436.93 C-23 - C -23C - C -23C C-25 - C -25B - C-258 C -30 -C -30-C-30 13,206.58 9,450.00 325.89 C -30 -C -30A -C -30A 13,206.09 9,450.00 328.81 C-33 - C-33 - C-33 868.04 875.00 26.79 C-33 - C -33A - C -33A 868.04 875.00 26.79 C-33 - C -33A- Plan #2 868.04 875.00 26.79 C-33 - C-33PB1 - C-33PB1 668.04 875.00 26.79 C-34 - C-34 - C-34 C-34 - CUA C -34A C-35 - C-35 - 635 C-35 - C -35A- C -35A C-35 - C -35B - C35B C-36 - C-36 - C-36 4,178.61 4,300.00 285.54 C-36 - C -36A- C -36A 4,176.61 4,300.00 285.54 C-36-C-36APB1-C-36APB1 4,178.61 4,300.00 285.54 C -38 -C -38-C38 1,972.30 2,100.00 307.13 C39 -C39-639 639 - C39A- C -39A 622/2017 10: 18:25AM CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation Page 3 /�OGCC Report COMPASS 5000.1 Build 810 ` A by BP IGk2 �� Travelling Cylinder Report BAKER HUGHES Company: North Amens -ALASKA -BP Project: Prudhoe Bay Reference Site: PB C Pad She Error: 0.00 usft Reference Well: C-11 Well Error: 0.00 usft Reference Wellbore C-118 Reference Design: C-118 Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well C-11 C-1 1A @ 61.83usft (Nabors 2ES) C -11A @ 61.83usft (Nabors 2ES) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Oftset Datum Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) lush) (usft) PB C Pad C-39 - CJ9APB1 - C-39AP81 C-39 - C-39PB1 - C-39PB1 C42 -C42 -C,42 3,312.77 3,325.00 128.53 C42-C42A-C42A 3,312.77 3,325.00 128.53 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 6/22/2017 10:18:25AM Page 4 COMPASS 5000.1 Build 81D A00 "GCC RSR, o�conr � Pdnted 7/31/2017 1:1621PM North America -ALASKA - BP Page 1 of 2 Cementing Report Common Well Name: C-11 / 02 --" --- - -- Projacl: Prudhoe BaY - - _ _- - _ - - - — -- _ — -- - _ Report date: 6/18/2017—� Re ort no.: 1 - - — D Event Type: COM- ONSHORE (CON) _ - Site: PB C Pad ._ _. -- — — — Spud Date/Time: 8/11/1979 Contractor: NABORS ALASKA DRILLING INC. Start Date: 6/17/2017 End Date: 6/18/2017 _ AFE No.: BPUOI: SA "00 - Rig Name/No.: COR -2 Rig Release: 6/19/2017 X3-01BC2-C: (1,331,991.00 ) Active datum: KB @61.83usft (above Mean Sea Level) _—"-- -- - -- General Information Job type. Primary Cement Company: SCHLUMBERGER Cement job start date/time: 6/18/2017 9:45PM Job end date/time: 6/19/2017 12:OOAM Cemented String: PRODUCTION LINER 1 String Size: Cementer: DYLAN WAUGH 2.875 (in) String Set TMD: 13,432.00 (usfl) Hole Size: 0.000 (in) Pipe 11110"Memt Pipe Movement: NO MOVEMENT Rotating Time (Start -End): RPM: Rotating Torque (init/avg/max): (It-lbo Reciprocating Time (Start -End): Recip Drag Up/Down: - (kip) SPM: Stroke Length: pluidwatine: cram Fluids (1 of 1) Slurry Type: CEMENT Purpose: PRIMARY Yield: Class: G -CLASS Description: TAIL SLURRY Density: (ppg) 1.3100 (ft'/sk) Mix Water Ratio: 6.113 (gaVsk84) Excess: 20.00 (%a) Mix Method* hod BATCH Sacks Used: 162.00 (941b sacks) Water Volume: 23.6 (bbl) Excess Slurry Volume: 6.3 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 37.8 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Gels 10 Sec: Density: 8.45 (ppg) PV: 0.00 (cp) YP: 0.000 (I01001tJ Viscosity: 0.00 (s/qt) 0.000 (Ibf/100ft-) Gels 10 Min: 0.000 (fbf/10of -) Additly" Name Type Amount Units D047 ANTIFOAM AGENT Concentration Unit D085 DISPERSANT 0.200 GAL/SX D767 FLUID LOSS 1.500 %BWOC D600 G GAS -BLOCK 0.100 %BWOC Di63 MICRO 1.500 GAL/SX D800 RETARDER AID 5.000 %BWOC 0.01011. BWOC Fluid Teale Thick time Thick Free water (hr) temp. (%) Free water Fluid loss temp. Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength ("F) (cG30min) (°F) I temp. press. Strength Strength 9 9 Stren th Stren th Time Pressure 2 Temperature 2 (psi) (°F) i) Time 1 Pressure 1 Temperature 1 2 (psi) (`F) 5.45 0.00 80.00 44.0 (min) (psi) 180.00 1,000.00 (°F) ((min) Pdnted 7/31/2017 1:1621PM Printed 7/31/2017 1:16:21PM North America -ALASKA - BP Page 2 012 Cementing Report Common Well Name: C-11 / 02 _ _ _ Repon no. 1 Report date: 6/18/2017 Project: Prudhoe Bay __ _ __ _ Site: PBC Ped - -- - - Spud Date/Time: B/11/1979 - - Event Type: COM-ONSHORE (CON) Start Date: 6/17/2017 End Date: 611QW17 - - AFE No.: Contractor: NABORS ALASKA DRILLING INC. Rig Name/No.: CDR-2 Rig Release: 6/1812017 X3-018C2-C (1,331,991.00 ) BPUOI: USAO0000s38 - _ Active datum: KB (ig61s3uaR (above Mean Sea Level) - -- - - Stage Stage Type Est. Top Est( Est. Bottom Mud Circ. Mud Circ. Top Bottom plea presswe Finat pressure ReWme Circulate Cmt Val to Total Annular no. (usft) Rate Press. Plug Plug Bumped Bumped Held Held Prior Surtace Mud Lost Flow (gpm) (psi) (ire) (min) (hr) (bbl) (bbl) After 1 PRIMARYCEMENT 9,642.00 13,432.00 y Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumped Disp. Rate TMD TMD Pmp dateltime job Used temp. temp. (bbl) Rate (bbl/min) (usft) (usR) (scf) (bbl/min . Tolle Casing Test Shoe Test Liner Top Test Test Pressure: (psi) FIT/LOT: (ppg) Liner Overlap: (usR Time: (min) Tool: N Positive Test: (Ppg) Positive Teat Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test. P13g) Negative Test Tool: N Hours Before Start: (hr) Time befo-e test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usR) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Hrs Prior to Log: (hr) How Determined: Printed 7/31/2017 1:16:21PM 21 7002 BA ER PRINT DISTRIBUTION LIST 2 8 4 4 0 F�UGHES a GE company COMPANY BP Exploration Alaska AECEI�E WELL NAME C -IIB Y G JUL 2 7 2017 FIELD Prudhoe Bav Unit COUNTY PRUDHOE BAY Ay^GCC BHI DISTRICT Alaska AUTHORIZED BY Paul Canizares EMAIL Paul.Canizares@bakerhuohes com STATUS Final Replacement COMPANY ADDRESS (FEDEX WILL WT DELIVER TO P.O. BOX) PERSON ATTENTION V I BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage. Alaska 99508 2 ConocoPhillips Alaska Inc. Atm: Ricky Elgarico AT03-344 700 G Street Anchorage, AK 99510 3 ExxonMobil, Alaska Ann: Lynda M. Yaskell and/or Lisa Boggs 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska -AOGCC Atte: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division oloil & Gas -- Ann: James Hyun 550 West 7th Avenue, Suite 802 IAnchorage, Alaska 99501 l-* Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, IR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 Attn: Dodie Stinson ase sign and return one copy of this transmittal form to: Exploration (Alaska) Inc. rotechnical Data Center, 1-112-1 DATA LOGGED Q /z/201-1 E. Benson Blvd. M. K. BENDER :horage, Alaska 99505 LOG TYPE RPM:PNC3D LOG DATE July 1, 2017 TODAYS DATE July 16, 2017 Revision No Details: Requested by: FIELD FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Suryeys) (Compass) # OF PRINTS # OF COPIES # OF COPIES # OF COPIES 4 lu 4 4 4 4 0 0 1 1 0 TOTALS FORTH IS PAGE: 0 2 5 5 0 BA ER PRINT DISTRIBUTION LIST FUGHES a GE company COMPANY BP Exploration Alaska Inc. �° WELL NAME C-11B ' ECE FIELD Prudhoe Bay Unit JUL 2 5 2017 21 7002 28428 sign and return one copy of this transmittal form to: Exploration (Alaska)Inc rotechnical Data Center, L12-1 DATA LOGGED 12=/2017 ) E. Benson Blvd. J, K. BENDER :h0rage. Alaska 99505 COUNTY PRUDHOEBAY GCC LOG TYPE GR -RES BHI DISTRICT Alaska las, tills, PDF, META, I --- REPORT LOGS LOG DATE June 17, 2017 AUTHORIZED BY Patrick Rider # OF PRIN ur Mum EMAIL Patrick. Rider(cDbakerhughes com TODAYS DATE July 21, 2017 STATUS Final Replacement: COMPANY ADDRESS (FEDEx wnL Nor DELIVER TO P.O. Box) PERSON ATTENTION V 1 BP North Slope. EOA, PBOC, PRBdO (Office 109) D&GWO Wells Admin Brenda Glammaker & Peggy O'Neill 900 E. Reason Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Atm: Ricky Elgarico ATO 3-344 700 G Street Anchorage, AK 99510 3 ExxonMobil, Alaska Ann: Lynda M. Yaskell and/or Leonardo Elias .3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Atm: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, .Alaska 99501 Revision No Details: Rev. Requested by: FIELD/ FINAL CD/DVD FINAL PRELIM LOGS las, tills, PDF, META, I SURVEY REPORT LOGS CG(M, Final Surveys) (Compass) # OF PRIN ur Mum # OF COPIES J#OFCOPIES # OF COPIES 4 lu 0 0 1 1 0 0 1 1 1 1 1 1 1 0 5 DNR - Division ofoil & Gas •.. 0 0 Atm: Resource Evaluation 550 West 7th Avenue. Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 F Benson Blvd Anchorage, Alaska 99508 Attn: Gerardo Cedillo TOTALS FOR THIS PAGE: 0 2 4 4 0 bp RECEIVED JUL 2 5 2017 AOGCC North America - ALASKA - BP Prudhoe Bay PB C Pad C-11 C-11 B 500292038202 Design: C -11B Final Survey Report 19 June, 2017 21 7002 riFag BAKER HUGHES 28428 o = "' by �,.�•' C-11, C-11 BP Final Survey Report IGaa BAKER HUGHES Company: Project: Site: North America - ALASKA - BP Prudhoe Bay PB C Pad Local Co-ordinate Reference: ND Reference: MD Reference: Well C-11 C -11A @ 61.83usft (Nabors 2ES) C -11A @ 61.83usft (Nabors 2ES) 70' 17'22.367 N Well: C-11 North Reference: True 148' 41'2.797 W Wellbore: Design: C -11B C -11B Survey Calculation Method: Database: Minimum Curvature EDM RSK-Alaska PROD -ANCP1 1.24 ° Project Prudhoe Bay, GPB, PRUDHOE BAY Ground Level: 32.73 usft (1) Map System: Geo Datum: Map Zone: Alaska NAD27 State Plane Zones NAD27' OGP-Usa AK [4267'15864] NAD27' OGP-Use AK/ Alaska zone 4 [26734'1586, System Datum: Mean Sea Level Using Well Reference Point Using geodetic scale factor 119.79 Site PB C Pad, TR -11-14 C-11, C-11 Site Position: Northing: 5,957,218.720 usft Latitude: 70' 17'22.367 N From: Map Easting: 662,550.030 usft Longitude: 148' 41'2.797 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.24 ° Well C-11, C-11 Audit Notes: Well Position +N/S 0.00 usft Northing: 5,960,549.000 usft Latitude: 70" 17'54.775 N ACTUAL +E/ -W 0.00 usft Easting: 664,140.000 usft Longitude: 148° 40' 14.357 W Position Uncertainty 0.00 usft Wellhead Elevation: 33.05 usft Ground Level: 32.73 usft Wellbore C -11B Magnetics Model Name Sample Date Declination _wa.. Dip Angle Field Strength (1) (1) (nT) BGGM2016 6/1/2017 17.87 81.01 57,551 Design C -11B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,463.03 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (1) 28.78 0.00 0.00 119.79 6/192017 5:55:17PM Page 2 COMPASS 5000.1 Build 81D 1•+a� BP IGR\ b Z p Final Survey Report BAKER �N` HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: C -11A @ 61.83usft (Nabors 2ES) Site: PB C Pad MD Reference: C -11A @ 61.83usft (Nabors 2ES) Well: C-11 North Reference: True Wellbore: C-11 B Survey Calculation Method, Minimum Curvature Design: C-118 Database: EDM RSK- Alaska PROD -ANCP1 C Survey MD Survey Program Date 6/19/2017 TVD TVDSS From To Northing Easting DLeg (usft) (usft) Survey (Wellbore) Tool Name Description (usft) 100.55 8,100.55 C-11 Srvy 1 BOSS -MS (C-11) BOSS -GYRO Sperry -Sun BOSS gyro multishot (usft) 8,193.00 10,463.03 C -11A Srvyt MWD+FIR+MS(C-11A) MWD+IFR+MS-WOCA MWD +IFR+Multi Station W/O Crustal 10,481.00 13,432.00 BHI CTK MWD (C-11 B) MWD MWD - Standard C Survey MD Inc An (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg (usft) (1 (°) (usft) (usft) (usft) (usR) (usft) (usft) ("/100usft) 28.78 0.00 0.00 28.78 -33.05 0.00 0.00 5,960,549.000 664,140.000 0.00 100.55 0.18 32.50 100.55 38.72 0.10 0.06 5,960,549.097 664,140.058 0.25 200.55 0.23 330.21 200.55 138.72 0.40 0.05 5,960,549.403 664,140.036 0.22 300.55 0.38 261.29 300.55 238.72 0.53 -0.38 5,960,549.518 664,139.606 0.37 400.55 0.48 234.29 400.55 338.72 0.23 -1.05 5,960,549.208 664,138.945 0.22 500.55 0.77 224.69 500.54 438.71 -0.49 -1.86 5,960,548.469 684,138.148 0.31 600.55 0.73 216.10 600.53 538,70 -1,48 -271 5,960,547.458 664,137.323 0.12 700.55 0.52 216.60 700.52 638.69 -2.36 -3.36 5,960,546.565 664,136.696 0.21 800.55 0.37 229.69 800.52 738.69 -2.94 -3.87 5,960,545.981 664,136.192 0.18 900.55 0.28 258.70 900.52 838.69 -3.19 -4.36 5,960,545.714 664,135.712 0.18 1,000.55 0.32 272.50 1,000.52 938.69 -3.23 -4.88 5,960,545.667 664,135.194 0.08 1,100.55 0.22 296.00 1,100.52 1,038.69 -3.13 -5.33 5,960,545.753 664,134.741 0.15 1,200.55 0.20 334.30 1,200.52 1,138.69 -2.89 -5.58 5,960,545.989 664,134.487 0.14 1,300.55 0.20 23.60 1,300.52 1,238.69 -2.57 -5.58 5,960,546.306 664,134.475 0.17 1,400.55 0.25 17.39 1,400.52 1,338.69 -2.21 -5.45 5,960,546.677 664,134.602 0.06 1,500.55 - 0.32 11.50 1,500.51 1,438.68 -1.72 -5.33 5,960,547.161 664,134.712 0.08 1,600.55 0.33 341.71 1,600.51 1,538.68 -1.18 -5.36 5,960,547.707 664,134.665 0.17 1,700.55 0.42 329.11 1,700.51 1,638.68 -0.59 -5.64 5,960,548.289 664,134.374 0.12 1,800.55 0.33 338.71 1,800.51 1,738.68 -0.01 -5.93 5,960,548.865 664,134.069 0.11 1,900.55 0.40 353.80 1,900.51 1,838.68 0.61 -6.08 5,960,549.478 664,133.913 0.12 6119/2017 5,55: 17PM Page 3 V. Sec (usR) 0.0C 0.01 -0.1E -0.5s -1.02 -1.37 -1.6, -1.74 -1.9C -2.21 -2.62 -3.07 -3.4C -3.51 -3.61 -3.77 -4.07 -4.6C -5.1E -5.5E COMPASS 5000.1 Build 81D BP FORM bFinal Survey Report BAKER Company: North America - ALASKA - BP Local Coordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: C -11A @ 61.83usft (Nabors 2ES) Site: PB C Pad MD Reference: C -11A @ 61.83usft (Nabors 2ES) Well: C-11 North Reference: True Wellbore: C-11 B Survey Calculation Method: Minimum Curvature Design: C -11B Database: EDM RSK-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVOSS NIS ENV Northing Easting DLeg V. Sec (waft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 2,000.55 0.72 332.00 2,000.50 1,938.67 1.51 -6.41 5,960,550.372 664,133.561 0.38 -6.31 2,100.55 0.35 282.71 2,100.50 2,038.67 2.13 -7.00 5,960,550.981 664,132.954 0.56 -7.11 2,200.55 0.35 256.60 2,200.50 2,138.67 2.13 -7.60 5,960,550.964 664,132.359 0.16 -7.65 2,300.55 0.28 262.10 2,300.49 2,238.66 2.03 -8.14 5,960,550.848 664,131.823 0.08 -8.07 2,400.55 0.70 145.61 2,400.49 2,338.66 1.49 -8.03 5,960,550.313 664,131.938 0.86 -7.71 2,500.55 0.75 127.70 2,500.48 2,438.65 0.58 -7.17 5,960,549.427 664,132.820 0.23 -6.51 2,600.55 1.08 103.20 2,600.47 2,538.64 -0.03 -5.73 5,960,548.844 664,134.268 0.50 4.96 2,700.55 1.32 87.90 2,700.45 2,638.62 -0.20 -3.67 5,960,548.716 664,136.340 0.40 -3.08 2,800.55 0.88 80.00 2,800.43 2,738.60 -0.03 -1.76 5,960,548.933 664,138.243 0.46 -1.51 2,900.55 0.60 76.50 2,900.42 2,838.59 0.23 -0.49 5,960,549.216 664,139.502 0.28 -0.54 3,000.55 0.32 92.20 3,000.42 2,938.59 0.34 0.30 5,960,549.345 664,140.288 0.30 0.09 3,100.55 0.30 113.20 3,100.42 3,038.59 0.22 0.81 5,960,549.242 664,140.810 0.11 0.60 3,200.55 0.27 135.20 3,200.42.3;138:59 -0.05 1.22 5,960,548.981 664,141.222 0.11 1.08 3,300.55 0.30 132.50 3,300.42 3,238.59 -0.39 1.58 5,960,548.645 664,141.589 0.03 1.57 3,400.55 0.23 164.11 3,400.41 3,338.58 -0.76 1.83 5,960,548.280 664,141.845 0.16 1.96 3,500.55 1.50 216.00 3,500.40 3,438.57 -2.01 1.11 5,960,547.013 664,141.158 1.37 1.97 3,600.55 5.33 241.19 3,600.21 3,538.38 -5.31 -3.73 5,960,543.610 664,136.390 4.02 -0.6f 3,700.55 8.22 224.60 3,699.51 3,637.68 -12.64 -12.82 5,960,536.083 664,127.461 3.46 4.84 3,800.55 7.30 196.29 3,798.63 3,736.80 -23.83 -19.62 5,960,524.745 664,120.904 3.89 -5.19 3,900.55 8.72 191.69 3,897.65 3,835.82 -37.36 -22.94 5,960,511.155 664,117.882 1.56 -1.35 4,000.55 10.30 194.19 3,996.28 3,934.45 -53.45 -26.67 5,960,494.987 664,114.507 1.63 3.41 4,100.55 12.37 196.00 4,094.32 4,032.49 -72.41 -31.81 5,960,475.915 664,109.778 2.10 8.37 4,200.55 14.03 199.00 4,191.68 4,129.85 -94.17 -38.71 5,960,454.012 664,103.356 1.80 13.19 4,300.55 15.93 202.10 4,288.27 4,226.44 -118.35 47.82 5,960,429.642 664,094.776 2.06 17.30 4,400.55 18.10 205.00 4,383.89 4,322.06 -145.15 -59.55 5,960,402.597 664,083.636 2.33 20.43 4,500.55 20.42 208.10 4,478.29 4,416.46 -174.62 -74.34 5,960,372.811 664,069.500 2.53 22.24 4,600.55 22.60 209.39 4,571.32 4,509.49 -206.75 -91.99 5,960,340.301 664,052.559 2.23 22.89 6/19/2017 5..55: 17PM Page 4 COMPASS 5000.1 Build 81D 40'"= b z•...� p BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: C -11A @ 61.83usft (Nabors 2ES) Site: PB C Pad MD Reference: C -11A @ 61.83usft (Nabors 2ES) Well: C-11 North Reference: True Wellbore: C-11 B Survey Calculation Method: Minimum Curvature Design: C -11B Database: EDM RSK- Alaska PROD -ANCP1 ri.G RAKER Survey MD Inc Azl(minnuth) TVD TVDSS NIS EIW Northing Easting DI -eq V. Sec (usft) V) (I (usft) (usft) (usft) (usft) (usft) (usft) (9100usft) (usft) 4,700.55 24.77 210.29 4,662.89 4,601.06 -241.59 -111.98 5,960,305.040 664,033.327 2.20 22.84 4,800.55 25.63 210.00 4,753.38 4,691.55 -278.41 -133.36 5,960,267.764 664,012.758 0.87 22.58 4,900.55 26.13 209.89 4,843.35 4,781.52 -316.23 -155.15 5,960,229.478 663,991.803 0.50 22.46 5,000.55 26.37 209.89 4,933.03 4,871.20 -354.58 -177.19 5,960,190,663 663,970.606 0.24 22.38 5,100.55 26.10 209.79 5,022.73 4,960.90 -392.92 -199.19 5,960,151.850 663,949.455 0.27 22.35 5,200.55 26.38 209.69 5,112.43 5,050.60 431.31 -221.12 5,960,112.993 663,928.367 0.28 22.38 5,300.55 26.72 210.60 5,201.88 5,140.05 -469.96 -243.57 5,960,073.864 663,906.771 0.53 22.11 5,400.55 27.08 210.89 5,291.06 5,229.23 -506.85 -266.70 5,960,034.487 663,884.497 0.38 21.35 5,500.55 27.80 211.50 5,379.81 5,317.98 -548.26 -290.57 5,959,994.561 663,861.495 0.77 20.22 5,600.55 29.05 212.60 5,467.75 5,405.92 -588.60 -315.84 5,959,953.683 663,837.118 1.36 16.33 5,700.55 28.97 212.69 5,555.21 5,493.38 -629.44 -342.00 5,959,912.289 663,811.857 0.09 15.92 5,800.55 29.10 213.00 5,642.64 5,580.81 -670.21 -368.32 5,959,870.951 663,786,432 0.20 13.33 5,900.55 29.17 212.79 5,729.99 5,668.16 -711.09 - -394.76 5,959,829.505 663,760.892 0.12 10.69 6,000.55 28.70 213.19 5,817.50 5,755.67 -75167 -421.10 5,959,788.361 663,735.444 0.51 7.99 6,100.55 29.22 213.19 5,90500 5,843.17 -792.19 447.61 5,959,747.274 663,709.831 0.52 5.12 6,200.55 29.47 212.50 5,992.17 5,930.34 -833.37 474.19 5,959,705.534 663,684.160 0.42 2.5. 6,300.55 29.38 213.00 6,079.27 6,017.44 -874.69 -500.76 5,959,663.647 663,656.494 0.26 -0.03 6,400.55 29.28 213.00 6,166.45 6,104.62 -915.77 -527.44 5,959,621.996 663,632.721 0.10 -2.77 6,500.55 29.03 213.00 6,253.78 6,191.95 -956.62 -553.98 5,959,580.571 663,607.088 0.25 -5.50 6,600.55 28.43 213.60 6,341.47 6,279.64 -996.80 -580.36 5,959,539.831 663,581.586 0.67 -8.44 6,700.55 28.05 213.69 6,429.57 6,367.74 -1,036.19 -606.58 5,959,499.880 663,556.239 0.38 -11.62 6,800.55 27.22 214.00 6,518.16 6,456.33 -1,074.72 -632.41 5,959,460.803 663,531.257 0.84 -14.90 6,900.55 27.75 213.29 6,606.87 6,545.04 -1,113.14 -657.98 5,959,421.835 663,506.536 0.62 -18.00 7,000.55 30.27 213.89 6,694.32 6,632.49 -1,153.53 -684.81 5,959,380.873 663,480.590 2.54 -21.22 7,100.55 32.98 214.39 6,779.46 6,717.63 -1,196.92 -714.25 5,959,336.853 663,452.115 2.72 -25.21 7,200.55 34.03 214.19 6,862.84 6,801.01 -1,242.52 -745.34 5,959,290.581 663,422.023 1.06 -29.54 7,300.55 33.28 214.19 6,946.08 6,884.25 -1,288.36 -776.49 5,959,244,074 663,391.892 0.75 -33.79 611912017 5: 55: 17PM Page 5 COMPASS 5000.1 Build 81D ,,N,, 10...E by BP Final Survey Report WARS BAKER V N ES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Local Co-ordinate Reference: TVD Reference: MD Reference: well C-11 C -11A @ 61.83usft (Nabors 2ES) C -11A @ 61.83usft (Nabors 2ES) Well; C-11 Wellbore: C -11B Design: C -11B North Reference: Survey Calculation Method: Database: True Minimum Curvature EDM RSK- Alaska PROD -ANCP1 Survey MD Inc AN (azimuth) TVD TVDSS NIS EIW Northing Easting OLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 7,400.55 32.47 214.60 7,030.07 6,968.24 -1,333.16 -807.15 5,959,198.627 663,362.219 0.84 -38.14 7,500.55 31.73 214.29 7,114.78 7,052.95 -1,376.98 -837.20 5,959,154.162 663,333.127 0.76 -42.4- 7,600.55 31.15 214.69 7,200.10 7,138.27 -1,419.97 -866.74 5,959,110.538 663,304.540 0.62 -46.73 7,700.55 31.32 215.19 7,285.60 7,223.77 -1,462.48 -896.44 5,959,067.395 663,275.780 0.31 -51.38 7,800.55 32.32 214.69 7,370.57 7,308.74 -1,505.70 -926.63 5,959,023.526 663,246.539 1.03 -56.11 7,900.55 33.65 208.69 7,454.47 7,392.64 -1,552.00 -955.16 5,958,976.618 663,219.035 3.53 -57.87 8,000.55 35.92 208.29 7,536.60 7,474.77 -1,602.14 -982.36 5,958,925.899 663,192.933 2.28 -56.57 8,100.55 38.38 209.79 7,616.30 7,554.47 -1,654.92 -1,011.69 5,958,872.495 663,164.764 2.62 -55.80 8,193.00 41.47 210.35 7,687.19 7,625.36 -1,706.26 -1,041.43 5,958,820.525 663,136.161 3.36 -56.10 8,219.07 40.47 212.14 7,706.87 7,645.04 -1,720.87 -1,050.29 5,958,805.722 663,127.620 5.91 -56.53 8,311.62 36.56 219.33 7,779.31 7,717.48 -1,767.66 -1,083.77 5,958,758.210 663,095.174 6.42 -62.33 8,404.30 32.07 228.09 7,855.89 7,794 06 -1,805.49 -1,119.61 5,958,719.610 663,060.166 7.19 -74.65 8,498.34 27.09 229.59 7,937.65 7,875.82 -1.836.07 -1,154.52 5,958,688.281 663,025.939 5.35 -89.75 8,591.07 25.60 230.09 8,020.74 7,958.91 -1,862.61 .1,185.96 5,958,661.060 662,995.083 1.62 -103.85 8,685.11 25.00 226.45 8,105.77 8,043.94 -1,889.34 -1,215.95 5,958,633.685 662,965.688 1.77 -116.60 8,777.66 24.58 223.20 8,189.79 8,127.96 -1,916.85 -1,243.30 5,958,605.589 662,938.945 1.54 -126.67 8,871.50 24.21 219.11 8,275.26 8,213.43 -1,946.01 -1,268.80 5,958,575.882 662,914.090 1.84 -134.3 8,951.19 23.16 218.33 8,348.24 8,286.41 -1,970.98 -1,288.83 5,958,550.479 662,894.614 1.37 -139.29 9,062.76 22.44 212.32 8,451.10 8,389.27 -2,006.19 -1,313.83 5,958,514.733 662,870.395 2.18 -143.49 9,098.25 22.36 210.09 8,483.92 8,422.09 -2,017.76 -1,320.83 5,958,503.018 662,863.644 2.40 -143.82 9,126.00 19.06 208.22 8,509.87 8,448.04 -2,026.32 -1,325.62 5,958,494.354 662,859.042 12.13 -143.72 9,157.34 16.45 190.85 8,539.74 8,477.91 -2,035.19 -1,328.88 5,958,485.411 662,855.979 18.75 -142.14 9,191.53 12.90 173.98 8,572.82 8,510.99 -2,043.75 -1,329.39 5,958,476.846 662,855.655 16.15 -138.34 9,222.98 15.97 154.54 8,603.29 8,541.46 -2,051.15 -1,327.16 5,958,469.493 662,858.046 18.11 -132.72 9,251.63 20.09 142.52 8,630.54 8,568.71 -2,058.62 -1,322.47 5,958,462.129 662,862.899 19.31 -124.94 9,285.05 20.80 136.00 8,661.86 8,600.03 -2,067.45 -1,314.85 5,958,453.473 662,870.706 7.13 -113.95 9,317.78 20.87 132.89 8,692.45 8,630.62 -2,075.59 -1,306.55 5,958,445.509 662,879.189 3.39 -102.69 6/1912017 5:55:17PM Page 6 COMPASS 5000.1 Build 81D by %*041 BP Final Survey Report Company: North America -ALASKA- BP Local Co-ordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: C -11A @ 61.83usft (Nabors 2ES) Site: PB C Pad MD Reference: C -11A Q 61.83usft (Nabors 2ES) Well: C-11 North Reference: True Wellbore: C-11 B Survey Calculation Method: Minimum Curvature Design: C -11B Database: EDM RSK- Alaska PROD -ANCP1 HAS BAKER HUGHES Survey MD Inc Azi (azimuth) TVD TVDSS NIS EM Northing Basting DLeg V. Sec (usft) (1) (1) (usft) (usft) (usft) (usft) (usft) (usft) (1I100usft) (usft) 9,346.80 20.91 133.87 8,719.56 8,657.73 -2,082.70 -1,299.03 5,958,438.566 662,886.863 1.21 -92.65 9,379.60 24.75 133.27 8,749.78 8,667.95 -2,091.47 -1,289.80 5,958,430.007 662,896.274 11.73 -80.27 9,409.68 27.23 129.23 8,776.82 8,714.99 -2,100.14 -1,279.88 5,958,421.556 662,906.378 10.13 -67.36 9,439.94 31.01 123.04 8,803.26 8,741.43 -2,108.77 -1,267.98 5,958,413.185 662,918.467 15.96 -52.73 9,473.57 36.42 116.51 8,831.23 8,769.40 -2,117.96 -1,251.77 5,958,404.353 662,934.876 19.34 -34.10 9,504.50 38.25 110.47 8,855.83 8,794.00 -2,125.41 -1,234.57 5,958,397.281 662,952.226 13.23 -15.48 9,533.09 40.69 105.73 8,877.91 8,816.08 -2,131.03 -1,217.31 5,958,392.036 662,969.612 13.56 2.30 9,566.78 44.89 101.05 8,902.63 8,840.80 -2,136.29 -1,195.05 5,958,387.264 662,991.975 15.63 24.23 9,596.81 48.42 95.18 8,923.25 8,861.42 -2,139.34 -1,173.45 5,958,384.689 663,013.638 18.44 44.49 9,625.11 52.12 93.48 8,941.33 8,879.50 -2,140.97 -1,151.75 5,958,383.530 663,035.365 13.87 64.14 9,658.21 54.75 91.75 8,961.05 8,899.22 -2,142.18 -1,125.20 5,958,382.904 663,061.937 8.99 87.78 9,688.99 58.87 88.78 8,977.90 8,916.07 -2,142.28 -1,099.45 5,958,383.363 663,087.679 15.63 110.18 9,717.79 65.57 87.98 8,991.32 8,929.49 -2,141.56 -1,073.99 5,958,384.644 663,113.111 23.39 131.91 9,751.69 71.14 89.83 9,003.82 8,941,99 -2,140.97 -1,042.50 5,958,385.924 663,144.578 17.19 158.94 9,783.17 77.56 88.98 9,012.30 8,950.47 -2,140.65 -1,012.21 5,958,386,904 663,174.657 20.56 185.08 9,811.38 84.25 86.35 9,016.76 8,954.93 -2,139.51 -984.39 5,958,388.651 663,202.637 25.44 208.6'. 9,843.05 89.20 83.48 9,018.57 8,956.74 -2,136.71 -952.91 5,958,392.141 663,234.047 18.06 234.57 9,905.04 87.28 83.14 9,020.47 8,958.64 -2,129.49 -891.38 5,958,400.700 663,295.406 3.15 284.39 9,953.46 91.48 83.14 9,021.00 8,959.17 -2,123.71 -843.32 5,958,407.530 663,343.325 8.67 323.23 10,029.05 89.01 82.65 9,020.68 8,958.85 -2,114.36 -768.32 5,958,418.514 663,418.100 3.33 383.68 10,060.02 88.40 81.86 9,021.38 8,959.55 -2,110.18 -737.64 5,958,423.355 663,448.679 3.22 408.23 10,091.09 89.75 82.67 9,021.68 8,960.05 -2,106.00 -706.85 5,958,428.207 663,479.361 5.07 432.87 10,133.26 93.40 81.52 9,020.72 8,958,89 -2,100.21 -665.11 5,958,434.913 663,520.967 9.07 466.21 10,183.25 94.02 81.06 9,017.48 8,955.65 -2,092.65 -615.80 5,958,443.542 663,570.096 1.54 505.26 10,230.86 93.64 81.54 9,014.30 8,952.47 -2,085.47 -568.84 5,958,451.751 663,616.882 1.28 542.44 10,278.48 88.83 79.79 9,013.28 8,951.45 -2,077.75 -521.88 5,958,460.495 663,663.662 10.75 579.36 10,372.66 88.64 80.19 9,015.36 8,953.53 -2,061.38 429.16 5,958,478.881 663,755.999 0.47 651.70 6119/2017 5: 55: 17PM Page 7 COMPASS 5000.1 Build 810 ri.S HKER UGHES Survey BP Z by r Final Survey Report ►ra Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: C -11A @ 61.83usft (Nabors 2ES) Site: PB C Pad MD Reference: C -11A @ 61.83usft (Nabors 2ES) Well: C-11 North Reference: True Wellbore: C -11B Survey Calculation Method: Minimum Curvature Design: C-116 Database: EDM RSK- Alaska PROD -ANCP7 ri.S HKER UGHES Survey MD Inc Azi (azimuth) TVD TVDSS NIS EM Northing Easting DLeg V. Sec (uaft) 11 (1 (usft) (usft) (usft) (usft) (usft) (usft) ("HODusft) (usft) 10,463.03 91.05 79.33 9,015.60 8,953.77 -2,045.32 -340.23 5,958,496.882 663,844.544 2.83 720.89 10,481.00 90.59 79.90 9,015.34 8,953.51 -2,042.08 -322.56 5,958,500.506 663,862.141 4.07 734.6' Top of Whipstock 10,508.20 93.66 81.31 9,014.33 8,952.50 -2,037.64 -295.75 5,958,505.525 663,888.849 12.40 755.68 Interpolated azimuth 10,539.81 94.98 8295 9,011.95 8,950.12 -2,033.33 -264.52 5,958,510.521 663,919.967 6.64 780.64 Interpolated azimuth 10,569.04 91.32 84.47 9,010.35 8,948.52 -2,030.13 -235.52 5,958,514.351 663,948.892 13.55 804.22 Interpolated azimuth 10,600.90 87.02 86.12 9,010.81 8,948.98 -2,027.52 -203.78 5,958,517.658 663,980.566 14.46 830.47 Interpolated azimuth 10,631.06 88.18 87.68 9,012.07 8,950.24 -2,025.89 -173.69 5,958,519.944 664,010.609 6.45 855.77 Interpolated azimuth 10,641.08 89.26 88.20 9,012.29 8.950.46 -2,025:53 -163.68 5,958,520.523 664,020.609 11.96 864.28 First clean survey 10,666.06 90.25 93.88 9,012.40 8,950.57 -2,025.98 -138.72 5,958,520.615 664,045.576 23.08 886.17 10,691.08 87.66 95.10 9,012.86 8,951.03 -2,027.94 -113.78 5,958,519.202 664,070.548 11.44 908.78 10,737.72 87.60 101.97 9,014.79 8,952.96 -2,034.85 -67.72 5,958,513.298 664,116.741 14.72 952.19 10,766.10 87.24 105.68 9,016.07 8,954.24 -2,041.62 40.20 5,958,507.128 664,144.406 13.12 979.4- 79.410,791.47 10,791.47 87.02 108.33 9,017.34 8,955.51 -2,049.03 -15.97 5,958,500.250 664,168.788 10.47 1,004.15 10,821.18 88.19 111.24 9,018.58 8,956.75 -2,059.08 11.96 5,958,490.816 664,196.927 10.55 1,033.38 10,851.51 88.40 115.31 9,019.48 8,957.65 -2,071.06 39.80 5,958,479.451 664,225.024 13.43 1,063.49 10,876.30 86.87 118.03 9,020.50 8,958.67 -2,082.17 61.93 5,958,468.822 664,247.391 12.58 1,088.22 10,911.13 87.94 121.58 9,022.08 8,960.25 -2,099.46 92.12 5,958,452.195 664,277.945 10.64 1,123.01 10,940.69 89.91 124.74 9,022.64 8,960.81 -2,115.63 116.86 5,958,436.577 664,303.028 12.60 1,152.51 10,971.22 93.93 129.57 9,021.61 8,959.78 -2,134.05 141.16 5,958,418.695 664,327.730 20.57 1,182.75 10,995.56 94.51 128.86 9,019.82 8,957.99 -2,149.39 159.97 5,958,403.764 664,346.867 3.76 1,206.70 11,020.94 90.80 125.40 9,018.65 8,956.82 -2,164.69 180.18 5,958,388.912 664,367.401 19.98 1,231.83 61192017 5.55: 17PM Page 8 COMPASS 5000.1 Build 81D 11 p BP Final Survey Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: C -11A @ 61.83usft (Nabors 2ES) Site: PB C Pad MD Reference: C -11A @ 61.83usft (Nabors 2ES) Well: C-11 North Reference: True Wellbore: C-118 Survey Calculation Method: Minimum Curvature Design: C -11B Database: EDM RSK- Alaska PROD -ANCP1 ERR HUGHES Survey MD Inc AN (azimuth) TVD TVDSS NIS EIW Northing Basting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft 1 11,051.36 91.01 123.83 9,018.17 8,956.34 -2,181.97 205.21 5,958,372.186 664,392.802 5.21 1,262.14 11,083.41 89.45 121.78 9,018.04 8,956.21 -2,199.33 232.15 5,958,355.417 664,420.110 8.04 1,294.15 11,116.43 89.57 119.27 9,018.32 8,956.49 -2,216.10 260.59 5,958,339.274 664,448.907 7.61 1,327.16 11,146.43 90.18 116.61 9,018.39 8,956.56 -2,230.15 287.09 5,958,325.803 664,475.707 9.10 1,357.14 11,177.90 92.67 116.12 9,017.60 8,955.77 -2,244.12 315.27 5,958,312.452 664,504.189 8.06 1,388.54 11,211.38 90.68 113.82 9,016.62 8,954.79 -2,258.25 345.61 5,958,298.994 664,534,822 9.08 1,421.88 11,241.08 89.08 117.24 9,016.69 8,954.86 -2,271.05 372.40 5,958,286.785 664,561.889 12.71 1,451.50 11,270.51 89.02 119.92 9,017,17 8,955.34 -2,285.12 398.24 5,958,273.278 664,588.026 9.11 1,480.91 11,296.01 89.11 120.62 9,017.59 8,955.76 -2,297.98 420.26 5,958,260.911 664,610.320 2.77 1,506.41 11,325.64 90.77 119.98 9,017.62 8,955.79 -2,312.92 445.84 5,958,246.526 664,636.220 6.00 1,536.04 11,351.10 89.85 116.83 9,017.48 8,955.65 -2,325.03 468.23 5,958,234.909 664,658.869 12.89 1,561.49 11,384.36 88.99 115.76 9,017.82 8,955.99 -2,339.77 498.05 5,958,220.832 664,688.998 4.13 1,594.68 11,410.68 88.25 114.78 9,018.45 8,956.62 -2,351.00 .521.84 5,958,210.123 664,713.030 4.66 1,620.91 11,440.65 90.21 112.87 9,018.86 8,957.03 -2,363.10 549.25 5,958,198.621 664,740.697 9.13 1,650.71 11,471.34 90.77 112.49 9,018.59 8,956.76 -2,374.94 577.57 5,958,187.410 664,769.262 2.21 1,681.17 11,506.04 93.17 111.36 9,017.40 8,955.57 -2,387.88 609.74 5,958,175.169 664,801.703 7.64 1,715.51 11,536.84 91.72 111.22 9,016.09 8,954.26 -2,399.06 638.41 5,958,164.626 664,830.610 4.73 1,745.95 11,556.68 90.55 109.39 9,015.69 8,953.86 -2,405.94 657.01 5,958,158.151 664,849.357 10.95 1,765.51 11,583.11 89.88 105.92 9,015.60 8,953.77 -2,413.95 682.19 5,958,150.689 664,874.705 13.37 1,791.35 11,608.32 88.99 101.70 9,015.84 8,954.01 -2,419.97 706.67 5,958,145.210 664,899.303 17.11 1,815.58 11,644.61 86.66 98.30 9,017.22 8,955.39 -2,426.27 742.37 5,958,139.695 664,935.135 11.35 1,849.69 11,672.04 86.44 96.75 9,018.87 8,957.04 -2,429.85 769.52 5,958,136.703 664,962.348 5.70 1,875.03 11,701.77 86.93 95.55 9,020.59 8,958.76 -2,433.03 799.02 5,958,134.169 664,991.918 4.35 1,902.22 11,731.76 89.54 93.83 9,021.52 8,959.69 -2,435.48 828.90 5,958,132.372 665,021.834 10.42 1,929.36 11,766.74 89.88 91.24 9,021.69 8,959.86 -2,437.03 863.84 5,958,131.589 665,056.799 7.47 1,960.45 11,791.52 89.17 88.90 9,021.90 8,960.07 -2,437.06 888.62 5,958,132.099 665,081.569 9.87 1,981.97 11,822.11 89.82 86.55 9,022.17 8,960.34 -2,435.85 919.18 5,958,133.981 665,112.096 7.97 2,007.89 6/1912017 5:55:17PM Page 9 COMPASS 50001 Build 61D Survey BP I/.16 by B %,t Final Survey Report �ICuER MES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well C-11 TVD NO* 9,021.87 Project: Prudhoe Bay TVD Reference: G -11A @ 61.83uslf (Nabors 2ES) Northing (usft) 5,958,136.886 Site: PB C Pad MD Reference: C -11A @ 61.83usft (Nabors 2ES) Well: C-11 North Reference: True 9,021.23 Wellbore: C -11B Survey Calculation Method: Minimum Curvature 5,956,141.016 665,170.005 Database: EDM RSK- Alaska PROD -ANCPl Desian: C -11B 90.86 77.27 9,020.65 Survey MD (usR) 11,851.77 Inc (°) 91.32 AN (azimuth) (°) 84.71 TVD NO* 9,021.87 TVDSS (usft) 8,960.04 NIS (waft) -2,433.59 EIW (usft) 948.75 Northing (usft) 5,958,136.886 Easting (waft) 665,141.607 DLeg (°I100usft) 8.00 V. Sec (usft) 2,032.43 11,880.48 91.26 81.24 9,021.23 8,959.40 -2,430.08 977.23 5,956,141.016 665,170.005 12.09 2,055.4' 11,911.86 90.86 77.27 9,020.65 8,958.82 -2,424.23 1,008.05 5,958,147.536 665,200.686 12.71 2,079.25 11,940.52 90.22 74.13 9,020.38 8,958.55 -2,417.15 1,035.82 5,958,155.218 665,228.290 11.18 2,099.83 11,970.44 90.92 69.44 9,020.08 6,958.25 -2,407.80 1,064.23 5,958,165.185 665,256.488 15.85 2,119.84 12,005.00 90.31 63.73 9,019.71 8,957.88 -2,394.07 1,095.93 5,958,179.600 665,287.877 16.61 2,140.53 12,030.24 90.68 58.50 9,019.49 8,957.66 -2,381.89 1,118.02 5,958,192.267 665,309.696 20.77 2,153.65 12,060.23 92.12 56.51 9,018.76 8,956.93 -2,365.78 1,143.30 5,958,208.919 665,334.622 8.19 2,167.59 12,091.88 89.85 50.28 9,018.21 8,956.38 -2,346.92 1,168.69 5,958,228.328 665,359.591 20.95 2,180.26 12,120.40 88.06 45.04 9,018.73 8,956.90 -2,327.72 1,169.76 5,958,247.980 665,380.235 19.41 2,189.00 12,156.64 88.34 39.03 9,019.67 8,958.04 -2,300.83 1,214.00 5,958,275.393 665,403.882 16.59 2,196.68 12,181.11 88.71 35.36 9,020.50 8,958.67 -2,281.35 1,228.79 5,958,295.192 665,418.238 15.07 2,199.83 12,210.69 88.37 30.91 9,021.25 8,959.42 -2,256.59 1,244.95 5,958,320.293 665,433.852 15.08 2,201.56 12,241.96 88.00 25.96 9,022.25 8,960.42 -2,229.12 1,259.83 5,958,348.064 665,448.124 15.87 2,200.82 12,271.41 12,305.91 91.78 92.12 23.64 21.49 9,022.30 9,021.13 8,960.47 8,959.30 -2,202.39 -2,170.55 1,272.18 1,285.41 5,958,375.073 5,958,407.191 665,459.887 665,472.418 15.06 6.31 2,198.26 2,193.92 12,330.61 12,360.60 91.29 90.03 23.14 26.14 9,020.39 9,020.05 8,958.56 8,956.22 -2,147.71 -2,120.46 1,294.78 1,307.28 5,958,430.228 5,958,457.746 665,481.290 665,493.192 7.48 10.85 2.190.7- 2,188.02 12,390.90 90.46 29.35 9,019.92 8,958.09 -2,093.65 1,321.39 5,958,484.858 665,506.705 10.69 2,186.94 12,422.45 92.43 32.81 9,019.12 8,957.29 -2,066.64 1,337.66 5,958,512.213 665,522.389 12.62 2,187.65 12,451.44 91.99 36.07 9,018.00 8,956.17 -2,042.75 1,354.04 5,958,536.451 665,538.243 11.34 2,190.00 12,480.80 92.18 39.50 9,016.94 8,955.11 -2,019.57 1,372.02 5,958,560.021 665,555.705 11.69 2,194.08 12,510.68 91.38 43.33 9,016.01 8,954.18 -1,997.17 1,391.77 5,958,582.838 665,574.963 13.09 2,200.09 12,540.94 91.29 45.56 9,015.30 8,953.47 -1,975.58 1,412.95 5,958,604.890 665,595.666 7.37 2,207.75 12,570.62 12,600.88 91.63 90.71 49.41 51.63 9,014.55 9,013.93 8,952.72 8,952.10 -1,955.53 -1,936.30 1,434.82 1,458.17 5,958,625.409 5,958,645.147 665,617.088 665,640.010 13.02 7.94 2,216.76 2,227.47 12,630.51 91.10 48.87 9,013.46 8,951.63 -1,917.36 1,480.94 5,958,664.581 665,662.365 9.41 2,237.83 611912017 5.55:17PM Page 10 COMPASS 5000 1 Build 81D by BP Final Survey Report Company: North America -ALASKA- BP Local Co-ordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: C -11A @ 61.83usft (Nabors 2ES) She: PB C Pad MD Reference: C -11A @ 61.83usft (Nabors 2ES) Well: C-11 North Reference: True Wellbore: C -11B Survey Calculation Method: Minimum Curvature Design: C -11B Database: EDM RSK- Alaska PROD -ANCP1 FrA BAKER• • HUGHES Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Basting DLeg V. See Net) (1) (1) Well) (usR) (usft) (usR) (usR) (usR) (°1100usft) (usR) 12,660.07 90.49 45.16 9,013.05 8,951.22 -1,897.21 1,502.56 5,958,685.195 665,683,536 12.72 2,246.51, 12,690.83 89.23 42.86 9,013.12 8,951.29 -1,875.09 1,523.93 5,958,707.776 665,704.416 8.53 2,254.13 12,720.88 89.57 40.90 9,013.44 8,951.61 -1,852.71 1,543.99 5,958,730.579 665,723.980 6.62 2,260.43 12,750.61 88.89 39.31 9,013.84 8,952.01 -1,829.98 1,563.14 5,958,753.727 665,742.627 5.82 2,265.75 12,780.22 87.73 35.32 9,014.71 8,952.88 -1,806.44 1,581.08 5,958,777.645 665,760.045 14.03 2,269.62 12,810.59 88.34 32.70 9,015.75 8,953.92 -1,781.29 1,598.05 5,958,803.166 665,776.466 8.85 2,271.86 12,840.30 89.42 32.54 9,016.33 8,954.50 -1,756.27 1,614.07 5,958,828.526 665,791.927 3.67 2,273.32 12,871.19 89.45 35.56 9,016.64 8,954.81 -1,730.68 1,631.36 5,958,854.486 665,808.655 9.78 2,275.62 12,902.59 89.20 37.92 9,017.01 8,955.18 -1,705.52 1,650.14 5,958,880.047 665,826.881 7.56 2,279.42 12,929.92 90.98 40.48 9,016.97 8,955.14 -1,684.34 1,667.41 5,958,901.595 665,843.684 11.41 2,283.88 12,965.82 92.54 42.35 9,015.86 8,954.03 -1,657.43 1,691.14 5,958,929.013 665,866.824 6.78 2,291.11 12,991.40 92.40 44.85 9,014.76 8,952.93 -1,638.93 1,708.77 5,958,947.898 665,884,037 9.78 2,297.21 13,020.47 91.14 51.15 9,013.86 8,952.03 -1,619.50 1,730.35 5,958,967.795 665,905.188 22.09 2,306.29 13,055.26 90.15 56.17 9,013.47 8,95164 -1,596.89 1,758.36 5,958,989.008 665,932.742 14.71 2,320.36 13,080.85 89.23 58.48 9,013.61 8,951.78 -1,585.08 1,779.90 5,959,003.288 665,953.972 9.72 2,332.19 13,110.82 89.17 62.15 9,014.03 8,952.20 -1,570.24 1,805.93 5,959,018.690 665,979.670 12.25 2,347.4, 13,140.98 89.75 64.90 9,014.31 8,952.48 -1,556.79 1,832.92 5,959,032.719 666,006.361 9.32 2,364.16 13,170.80 89.57 62.62 9,014.49 8,952.66 -1,543.61 1,859.67 5,959,046.482 666,032.809 7.67 2,380.82 13,200.85 89.57 62.18 9,014.71 8,952.88 -1,529.69 1,886.30 5,959,060.981 666,059.127 1.46 2,397.01 13,231.52 90.52 59.82 9,014.69 8,952.86 -1,514.82 1,913.12 5,959,076.430 666,085.616 8.29 2,412.90 13,263.46 91.32 59.19 9,014.18 8,952.35 -1,498,61 1,940.64 5,959,093.232 666,112.772 3.19 2,428.73 13,290.72 88.28 54.30 9,014.27 8,952.44 -1,483.67 1,963.42 5,959,108.668 666,135.225 21.12 2,441.08 13,324.15 90.18 53.18 9,014.72 8,952.89 -1,463.90 1,990.38 5,959,129.019 666,161.736 6.60 2,454.65 13,350.09 91.07 51.81 9,014.44 8,952.61 -1,448.11 2,010.95 5,959,145.255 666,181.961 6.30 2,464.66 13,380.50 91.20 50.28 9,013.84 8,952.01 -1,429.00 2,034.60 5,959,164.881 666,205.179 5.05 2,475.69 13,391.16 90.18 48.49 9,013.71 8,951.88 -1,422.06 2,042.69 5,959,171.994 666,213.116 19.33 2,479.26 6/19/2017 5,55r17PM Page 11 COMPASS 5000.1 Build 81D Design Annotations Measured BP Local Coordinates Wiraa Depth +N1 -S +E/ -W BAKER Z ' S p 000iGHES Final Survey Report (usft) Comment 10,481.00 Company: North America - ALASKA - BP -2,042.08 Local Coordinate Reference: Well C -it 10,508.20 Project: Prudhoe Bay -2,037.64 TVD Reference: C -11A @ 61.83usft (Nabors 2ES) 10,539.81 Site: PB C Pad -2,033.33 MD Reference: C-11 A @ 61.83usft (Nabors 2ES) 10,569.04 Well: C-11 -2,030.13 North Reference: True 10,600.90 Wellbore: C-11 B -2,027.52 Survey Calculation Method: Minimum Curvature 10,631.06 Design: C -11B -2,025.89 Database: EDM RSK- Alaska PROD -ANCP1 10,641.08 Survey -2,025.53 -163.68 First clean survey 13,432.00 MD Inc Azi (azimuth) TVD NDSS NIS E/W Northing Easting DLeg V. Sec (usft) V) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/10ousft) (usft) 13,432.00 90.18 48.49 9,013.58 8,951.75 -1,394.99 2,073.27 5,959,199.720 666,243.098 0.00 2,492.35 Projection to TD Design Annotations Measured Vertical Local Coordinates Depth Depth +N1 -S +E/ -W (usft) (usft) (usft) (usft) Comment 10,481.00 9,015.34 -2,042.08 -322.56 Top of Whipstock 10,508.20 9,014.33 -2,037.64 -295.75 Interpolated azimuth 10,539.81 9,011.95 -2,033.33 -264.52 Interpolated azimuth 10,569.04 9,010.35 -2,030.13 -235.52 Interpolated azimuth 10,600.90 9,010.81 -2,027.52 -203.78 Interpolated azimuth 10,631.06 9,012.07 -2,025.89 -173.69 Interpolated azimuth 10,641.08 9,012.29 -2,025.53 -163.68 First clean survey 13,432.00 9,013.58 -1,394.99 2,073.27 Projectionto TD Prepared By Jose Vazquez - Tech Support Engineer 6/19/2017 5 55.17PM Page 12 COMPASS 5000.1 Build 61D Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWeliSiteEnginee@bp.com> Sent: Monday, July 10, 2017 9:41 AM To: AK, OPS GC1 Field O&M TL; AK, OPS GC3 Facility OTL, AK, OPS GC3 Wellpad Lead; AK, OPS GC3&PCC OSM; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; AK, OPS Well Pad CX; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; Glasheen, Brian P; Oshiro, Joleen; Regg, James B (DOA) Cc: AK, GWO DHD Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep; AKIMS App User, Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis 1; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R, Worthington, Aras J; Wallace, Chris D (DOA) Subject: OPERABLE: Producer C -11B (PTD# 2170020) Post Rig CMIT-TxIA and MIT -T Passed All, Producer C -11A (PTD# 2030480) was made not operable on 03/08/17 for having sustained inner annulus casing pressure over NOL and for failing a diagnostic TIFL. The well underwent a coil tubing sidetrack in April and is now C-118 (PTD# 2170020). Post rig work to correct the TxIA communication included a gas lift valve change out and resetting a tubing patch to isolate a known leak. The well passed an MIT -T to 2,456psi and OMIT-TxIA to 2,427psi on 07/09/17. The well now has two competent barriers and is reclassified as Operable at this time. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 WO From: AK, GWO Pr ' Well Integrity Sent: Wednesday, March 017 4:51 PM To: AK, GWO SUPT Well Integrity, OPS GC3&PCC OSM; AK, OPS GC3 Facility OTL; AK, OPS GC3 Field OTL; AK, OPS GC3 Operators; AK, OPS GC3 Wellpad Le , ismoski, Doug A; Daniel, Ryan; AK, GWO SUPT Special Projects; AK, GWO SUPT Slickline; AK, RES GPB West Wells Opt Eng?, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; AK, OPS PCC Ops Lead; AK, OPS Well Pad CX; 'Regg, James 8 (D im.regg@alaska.gov)'; Glasheen, Brian P Cc: AK, GWO DHD Well Integrity; AK, GWO Projects Well Integra , OPS FF Well Ops Comp Rep; Worthington, Jessica; Dickerman, Eric; Sternicki, Oliver R; AK, GWO Completions We rity; Burton, Kaity; AKIMS App User; Burton, Kaity; AK, GWO Completions Well Integrity; 'chris.wallace@alaska.gov , mpsey, David G; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; Tempel, Tfoy4.Worthington, Aras J; Allely, Josh Subject: NOT OPERABLE: Producer C -11A (PTD# 2030480) High Inner Annulus Pressure -Over MOASP THE STATE "'ALASKA GOVERNOR BILL WALKER John Egbejimba Drilling Supervisor BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU C -11B BP Exploration (Alaska), Inc. Permit to Drill Number: 217-002 Surface Location: 665' FNL, 1222' FEL, Sec. 19, Ti 1N, R14E, UM Bottomhole Location: 1940' FNL, 961' FWL, Sec. 20, TI IN, R14E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy P Foerster Chair DATED this LJday of February, 2017. STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMIS PERMIT TO DRILL 20 AAC 25.005 •■.vc1 v CLU JAN 13 2011 A r'l t`�_ 2-,A—% 1a. Type ofWork: 1b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑ 1 C. Specify if Well is proposed for: Drill ElLateral ❑ Strati graphic Test ❑ Development - Oil 0 Service - Winj ❑ Single Zone ® Coalbed Gas ❑ Gas Hydrates ❑ Redrill ® Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket ® • Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 295705380 • PBU C-11IS 3 Address: 8. Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 13425' - TVD: 8960'ss • PRUDHOE BAY, PRUDHOE OIL , 4a. Location of Well (Governmental Section): 7, Property Designation (Lease Number): ADL 028305 Surface: 665' FNL, 1222' FEL, Sec. 19, TI IN, 814E, UM 8. Land Use Permit: 13, Approximate spud date: Top of Productive Horizon: 2806 FNL, 2376' FEL, Sec. 19, T1 IN, R14E, UM 60-274 June 1, 2017 ' 9. Acres in Property: 2480 14. Distance to Nearest Property: Total Depth: 1940' FNL. 961' FWL, Sec. 20, T11N, R14E, UM 25910 4b, Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 61.83 -feet 15. Distance to Nearest Well Open Surface: x- 664140 . y- 5960549. Zone - ASP 4 GL Elevation above MSL: 32.73 deet to Same Pool: 16. Deviated wells: Kickoff Depth: 10485 • feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 90 - degrees Downhole: 3276 ' Surface: 2396 - 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casin Wei ht Gretle 'n Len th MD TVD TVD (includingstagedaza 9.3#/6.6# L-80 STUlC-11 3775' 9650' 8894'ss 13425' 8960'ss 172 sx Class'G' x2-7/8" /6.5# 19, PRESENT WELL CONDITION SUMMARY (To be completed for Retlrill and Re -Entry Operations) Total Depth MD (it): Total Depth TVD (11): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (it): Junk (measured): 10645 9017 10090 10090 9022 None Casing Length Size Cement Volume MD TVD Conductor/Strudurel 79 20"40" 12.9 cu vds Permafrost Concrete 32-111 32-111 Surface 2636 133/8" 4301 cu It Arcticeet 31-2667 31-2667 Intermediate 8164 9-5/8" 1276 cu it Class'G', 130 cu it AS 1 29-8193 29-7687 Liner 6551 7" 253 sx Class'G'. 438 sx Class'G'. 528 sx Class'G' 2484-9035 2484 - 8425 Liner 1777 4-112" 270 sx Class'G' 8867-10644 8271-901 Perforation Depth MD (It): 9810-10555 Perforation Depth TVD (it): 9017-9016 20. Attachments Property Plat ❑ BOP Sketch m Drilling Program ® Time v. Depth Plot ❑ Shallow Huard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Hvab. Trevor from without prior written approval. Email Trevor.Hyatt@bp.com Printed Name John Egbejimba Title Drilling Supervisor Signature Phone +1 907 564 4139 Date Commission Use Only Permit to Drill,7 ! 7 �� Number: L Apl Number: 50- 029-20382-02-00 Date:it Approval See cover letter for other 1 � requirements: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbedmet ne, gas hydrates, or gas contained in shales: Other: B o p fr�-t �C, �3 5v a p 51, Cd ,--1 Samples req'd: Yes ❑ / No Mud log req'd: Yes ❑ No V —W/ I���c�, f4"ri'Lljo ✓'(� ✓f lz✓��J H2S measures Yes No ❑, Directional svy req'd: Yes 19/ No ❑/ to 757610 %�� / Spacing exception req'd: Yes ❑ No 12/Inclination-only svy req'd: Yes ❑ No ff7 l Post initial injection MIT req'd: Yes ❑ No APPROVED BY Approved by COMMISSIONER THE COMMISSION Date:'L • (— ORIG NAL Form 10-401 Revised 11/2015 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) Submit Form and Attachments in Duplicate tltI17 ,,4b /-/71/ To: Alaska Oil & Gas Conservation Commission From: Trevor Hyatt Rig: Nabors CDR2 1 i CTD Engineer Target Reservoir: Ivishak Zone 1 & 2 Soo 1, IA✓J Date: January 10, 2017 Re: C-11 B Permit to Drill Request History and current status: Well C-11 was drilled and produced in March 1980. In April 2003 a Rotary sidetrack was performed to C -11A because the original well developed a leak in the casing. In 2012, a 4-1/2" tubing patch was set over GLM #4. This well is currently not competitive and is ready for a sidetrack. Proposed plan: Nabors CDR2 Coiled Tubing Drilling rig will drill a through tubing sidetrack on or around June 1st, 2017. Nabors CDR2 will exit into lower Zone 2A formation in C-1 1A perforations. The sidetrack will target Zone 1 B and 2A reserves. The proposed sidetrack is a 2,940' MD horizontal Ivishak Zone 1 B and 2A producer. The lateral will be completed with a 3-1/2" x 3-1/4" x 2-7/8" L-80 liner which will be cemented and perforated isolating the current Zone 2A perforations. CTD Drill and Complete C-11 B program: Ric Start Date June 1st 2017 Pre-Ri Work 1 S Fish Patch. Set TTP. Pull GLV 3. Circulate IA. Dummy Valves. Pull TTP, Pull Nipple Reducer 2. F Assist SL: Circulate IA to Diesel, MIT -OA, CMIT-TxIA 3. C Mill XN, Mill CIBP, Dummy WS drift to 10,485' MD 4. V Set BPV and Pre CTD Tree Work Rig Work: 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,396 psi. 2. Set 4-1/2" KB Packer Whipstock. 3. Mill 3.80" window plus 10' of rathole. Swap the well to 8.5-9.5 ppg drilling mud. 4. Drill 4.25" hole to TD at -13,425' MD 5. Run 3-1/2"x 3-1/4" x 2-7/8" L-80 liner leaving TOL at -9,650' MD. 6. Pump primary cement bringing TOC to between 9800' MD and TOL, 35.5 - 39.9 bbls of 15.3 ppg liner cement planned' 7. Cleanout liner and run GR/CCL/RPM log if cement job does not go as planned. 8. Test liner lap to 2,400 psi. ✓ 9. Freeze protect well, RDMO Post Rig: 1. V: Tree work as necessary. 2. S: LTP if necessary*. 3. F: Pressure Test LTP if necessary. ✓ 4. T: ASPIC flowback. ` Approved alternate plug placement per 20 AAC 25.112(i) Mud Program: • Well kill: 8.4-8.6 ppg brine. • Milling/drilling: 8.4-9.5 ppg Power Pro for milling window and drilling (>567 psi over -balance ). -- Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4.25" Liner Program: • 3-1/2", 9.3#, L-80, STL Solid Liner 9,650' MD —10,475' MD • 3-1/4", 6.6#, L-80, TCII Solid Liner 10,475' MD —10,685' MD • 2-7/8", 6.5# L-80, STL Solid Liner 10,685' MD — 13,425' MD • A minimum of 35.5 — 39.9 bbls of 15.3 ppg cement will be used for liner cementing. (TOC to between 9,800' MD and TOL) • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 9W. - • Magnetic and inclination surveys will be taken every 30 ft. - • Distance to nearest property — 25,910' • Distance to nearest well within pool — 216' Anti -Collision Failures • C-01 A Fails Major Risk for C-11 B W PO4 Anit-Collision. C-01 A is P&A'd and will be minor risked. • C-30 Fails Major Risk for C-11 B W PO4 Anit-Collision. C-30 is P&A'd and will be minor risked. • C -30A Fails Major Risk for C-11 B WP04 Anit-Collision. C -30A will be shut in and minor risked. Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL/RPM logs will be run if cleanout run is needed. Perforating: • 2", 6 spf, pert guns. Hazards • C -Pad is NOT an H2S pad • Low risk of lost circulation and only one planned fault crossings. Reservoir Pressure • The reservoir pressure is expected to be 3,276 psi at 8800' TVDss. (7.16 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,396 psi. • An EMW of 8.4 ppg for this well will provide 567 psi over -balance to the reservoir. Trevor Hyatt CC: Well File CTD Engineer Joseph Lastufka TREE = 6-318" ClW FLS WELLHEAD= ACTUATOR =BAKER FMC Oa" = KE. 61.3' BF. ELEV = 34.10' KOP= 8100• Max Angle = 94" @ 1018Y Datum MD= 9512' Datum TVD = 88w SS 13-3/8" CSG, 72M, L-80. D= 12.347" Minimum ID = 2.31" @ 8846' 4-1/2" X 2-7/8" NIP REDUCER 19-5/8" CSG, 47#, L-80, D = 8.681" I PERFORATION S11WT4ARY REF LOG: MAD GR ON 04/07/03 ANGLE AT TOP PI#: 84° Q 9810' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OpnISgz SHOT SQZ 3-3/8" 4 9810-9840 O 12118/11 BK 3-318" 4 9910-9940 O 12116/11 29 2" 6 10025- 10055 O 05115/14 2 2-12" 4 10140 - 10370 C 04/18/03 BK 2-12" 4 10420-10555 C 04/18/03 25 C-11 A SAFETY ES: WELL ANGLE> 70" @ 9752. 2205--412- H6 X NP, D= 3.813" 2484' 9-5/8" X 7" BKR ZXP LNR TOP PKR 2594' 9-5/8" w PKR BKR 45 WL KB STRA DOLE PATCH (02117/12) D = 2.45" GAS LET MANDRELS ST MD TVD DEV TYPE VLV LATCH HURT10"4J20103 01/31112 RCT/JXX FLOG SET (0129/12) 4 3297 3297 0 KBG-2 DOME BK 16 3 5671 5529 29 KBG2 DOME BK 16 2 7467 7086 32 KBG-2 OW BK 0 1 8734 8150 25 KBG-2 OW BK 0 8051' 9-5/8" X 7" BKR ZXP LNR TOP PKR ELbD TT NOT LOGG® MLLOUT WINDOW 8193 - 8209 8802' 41/2" FES X NP, D = 3.813" t;T.-Tr 4112' TBG, 12.6#, L-80. --1 8879' .0152 bpf, D = 3.958' 7' U4R. 29#, L-80, .0365 bpf, D = 6.125" 14-12" LNR 12.6#, L-80, .0152 bpf, D= 3.958' I DATE REV BY I ODWENTS DATE REVBYJ OOMVIENTS 03/28180 ORIGINALCOMPLEIION 05/19/14 LBIJMD ADPERFS(05/15/14) 04121/03 DAV/KK PoG SIDETRACK (C -11A) 06/30114 RB!PJC TREE CIO (06/26/14) 01/07/12 TBD/ PJC RILL PLUG, GLV CIO (0110311 1) 01/31112 RCT/JXX FLOG SET (0129/12) 02120/12 JTCIJMD SET STRADDLE PCR (02/17/12) 03/21/12 TJWJMD PILL XX PLUG (03/20112) ID=2.31" FES XN NP, D -73 725" 4-112" WLEG, D = 3.958" FW-17"X5"BKRZXP LNRTOPPKR !18' MARKER" T 10090' 412 C8P (12118111) 10558' PBTD PRUDHOE BAY LUT WELL: C -11A PERiAT No: 2030480 AR No: 500.029-20382-01 SEC 19, T11 N, R14F 665' FNL & 1222' FEL BP Exploration (Alaska) TREE WELLHEAD= FMC ACTIATOR= I DEVI OKB. E LEV = 61.3 BF. E LB/ = 34.10' KOP= 8100' Max Angle = _` @ ' Datum MD= _ Datum ND= 8800'SS PROPuSED SAEtf .OTES: WELL ANGLE >70"@ C_11 B 2206' 4-1/2" KM X NP, D = 3.813' 13-3/6- USG, 72#, L-80, D = 12.347' -t 2666' Minimum ID = 2.377" @ 10685' 3-3/16" X 2-7/8" XO 1 9-5/8' CSG, 47#, L-80, D= 8.681" 1 4-12' TBG, 12.6#, L-80, 8879• .0152 bpf, D = 3.958' O. _03650. _0365 bo�— OF 3-1/2" 3-1/2' LIR, _#, L- 980 STL, 10475' .0087 Dpf, D = 2.92' 2" KB PKR WHPSTOCK � 10486' 12.6#, L-80..0152 bpf, ID = 3.958' -10486 L-80 TCI t, .0079 bpf, D = 2.85' 10686' PERFORATION SEWARY W LOG: ON if ANGLE AT TOP PERF: @_' Note: Refer to Production DB for historical cert data FBTD . 1 2484' 1 GAS LFT MANDRAS ST MD I TVD I DEVI TYPEI VLV ILATCHIPORTI DATE 4 3297 3297 O KBG-2 DOMEBK i6 01103112 3 5671 5529 29 KBG-2 DOME BK 16 01/03/12 2 7467 7086 32 KBG-2 DMY SK 0 00120/03 1 8734 8150 25 KBG+2 DMY BK 0 04/20/03 - 8051'J -I9-5/8" X 7" BKR ZXP LTP w/HGR, D=6.280" F____] E Llm TT NOT LOGGED MILLOUT WFDOW 8193- 8209' 8802' 4-1/2' HES X NP, D= 3.813' 12' BKR S-3 I;BaA LKR D = 3.875' HES X NP, 57- 3.813' PES XN NP MLL®TO 3.80" (_!_ 887 7" X 5 887—'I a 12" 966 -1170" DEPLOY SLV, D= 3.00" 3-12"_XNP,D=2.813" 10476' 3-112"X 3-3116"X MLLOUT NRFOOW (C-118) 10485' 106 3-3/16' X 2-7/8" XO. D - 2.377" PUP JT w /RA TAG I DATE REV BY ODK94ENTS DATE I REV BY COMM80TS 03128180 OREGENAL COMPLETION 04/21103 DAV/KK RIG SIDETRACK(C-11A) _I_I_ CTD(C-118) 12/19/16 JMD BOLT PROPOS® PRUDHOE BAY UNIT WELL C -11B PEMT No: API No: 50-029-20382-02 SEC 19, TI IN, R14F_ 665' FPL 8 1222' FEL BP Exploration (Aim ka) Zti.•� bp North America - ALASKA - BP Prudhoe Bay PB C Pad C-11 C-11 B Plan: C -11B WP04 BP Coil Tubing Report 10 January, 2017 Fi BAKER HUGHES BP BP Coil Tubing Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well C-11 Mean Sea Level C -11A @ 61.83usft (Nabors 2ES) ° True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 'reject Prudhoe Bay, GPB, PRUDHOE BAY lap System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level leo Datum: NAD27 ° OGP-Usa AK [4267°15864] Using Well Reference Point lap Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor Site PB C Pad, TR -11-14 Site Position: C -11B WP04 ?,,,4 by From: Map Company: North Americs- ALASKA - BP Project: Prudhoe Bay Site: PB C Pad Well: C-11 Wellbore: C -11B Design: C -11B WP04 BP BP Coil Tubing Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well C-11 Mean Sea Level C -11A @ 61.83usft (Nabors 2ES) ° True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 'reject Prudhoe Bay, GPB, PRUDHOE BAY lap System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level leo Datum: NAD27 ° OGP-Usa AK [4267°15864] Using Well Reference Point lap Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor Site PB C Pad, TR -11-14 Site Position: C -11B WP04 Northing: 5,957,218.720 usft From: Map Easting: 662,550.030 usft Position Uncertainty: _ 0.00 usft _ Slot Radius: _ 0.000 In Well C-11, C-11Well 10,372.66 Vertical Section: Position aNl-S 0.00 usft Northing: 5,960,549.000 usft Position Uncertainty +El -W 0.00 usft 0.00 usft Easting: 664,140.000 usft (°) Wellhead Elevation: 33.05 usft 0.00 70.00 Ma ticks M Latitude: Longitude: Grid Convergence: g odel Name Sample Date Declination Dip Angle Field Strength 11 11 OT) BGGM2016 6/1/2017 17.87 81.01 57,551 Design C -11B WP04 Audit Notes: Version: Phase: PLAN Tie On Depth: 10,372.66 Vertical Section: Depth From (TVD( +N/ -S •EI -W Direction (usft) just[) (usft) (°) -33.05 0.00 0.00 70.00 Latitude: Longitude: Ground Level: Ned .a BAKE MES 70°17'22.367 N 148° 41'2.797 W 1.24 J 70° 1T 54.775 NJ 148° 40' 14.357 W 32.73 usft 1/1012017 8..31:15AM Page > COMPASS 5000.1 Build 81B ;b p Well C-11 TVD Reference: Mean Sea Level S0��e C -11A @ 61.83usft (Nabors 2ES) North Reference: True Company: North America - ALASKA - BP Minimum Curvature Database: Project: Prudhoe Bay MWD+IFR+MS-WOCA Site: PB C Pad + Multi Station W/O Crustal Well: C-11 MWD MWD -Standard Wellbore: C -11B NIS Design: C-118 VYP04 Northing Easting DLeg V. Sac TFace (usft) (usm Survey Tool Program Data 1/9/2017 (usft) (°/ta0usft) From 70 1°I -2,061.38 -429.16 (usft) (usft) Survey (Waltham) 0.00 100.55 8,100.53 C-11 Srvy 1 BOSS -MS (C-11) 0.00 8,193.00 10,372.66 C -11A Srvy 1 MWD+FIR+MS (C -11A) 10,372.66 13,425.00 C -11B WP04(C-11 B) - 663,782.813 Planned Survey, -1,081.39 -19.64 -2,045.32 MD Inc Azt 663,844.544 TVDSS (usft) 11 (°1 -2,041.38 (usft) 10,372.66 88.64 80.19 8,953.53 Actual Survey C -11A -2,038.96 -303.82 5,958,5D4.034 10,400.00 89.37 79.93 8,954.00 10,463.03 91.05 79.33 8,953.77 Actual Surey C -11A TIP -977.96 90.01 -2,033.73 10,485.00 90.49 80.03 8,953.48 KOP 90.00 -2,034.14 -204.12 10,500.00 90.49 81.36 8,953.35 10,505.00 90.49 81.83 8,953.30 End 9deg1100ft 12.00 -800.41 92.53 10,555.00 90.49 87.83 8,952.88 8 -725.32 92.53 -2,114.14 10,600.00 90.25 93.23 8,952.59 10,700.00 89.72 105.21 8,952.62 10,800.00 89.20 117.20 8,953.57 10,855.00 88.93 123.80 8,954.47 7 12.00 -588.41 -89.90 10,900.00 88.93 118.40 8,955.31 11,000.00 88.97 106.40 8,957.15 11,100.00 89.06 94.39 8,958.87 11,135.00 89.10 90.19 8,959.43 I e BP BAKER•■ BP Coil Tubing Report Nuc1Es Local Coordinate Reference: Well C-11 TVD Reference: Mean Sea Level MD Reference: C -11A @ 61.83usft (Nabors 2ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM RSK - Alaska PROD - ANCPi Tool Name Description BOSS -GYRO Sperry -Sun BOSS gyro multishot MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD MWD -Standard NIS ENy Northing Easting DLeg V. Sac TFace (usft) (usm (usft) (usft) (°/ta0usft) (usft ) 1°I -2,061.38 -429.16 5,958,478.881 663,755.999 0.00 -1,108.31 0.00 -2,056.66 402.23 5,958,484.187 663,782.813 2.83 -1,081.39 -19.64 -2,045.32 -340.23 5,958,496.882 663,844.544 2.83 -1,019.25 -19.64 -2,041.38 -318.62 5,958,501.289 663,865.063 4.08 -997.60 128.66 -2,038.96 -303.82 5,958,5D4.034 663,880.808 9.00 -982.86 90.00 -2,038.23 -298.87 5,958,504.872 663,885.737 9.00 -977.96 90.01 -2,033.73 -249.10 5,958,510.460 663,935.395 12.00 -929.65 90.00 -2,034.14 -204.12 5,958,511.029 663,980.371 12.00 -887.53 92.50 -2,050.13 -105.59 5,958,497.193 664,079.218 12.00 -800.41 92.53 -2,086.24 -12.54 5,958,463.129 664,173.031 12.00 -725.32 92.53 -2,114.14 34.82 5,958,436.277 664,220.982 12.00 -690.36 92.42 -2,137.36 73.33 5,958,413.895 664,259.990 12.00 662.11 -90.00 -2,175.39 165.60 5,958,377.898 664,353.065 12.00 -588.41 -89.90 -2,193.40 263.77 5,958,362.041 664,451.592 12.00 -502.32 -89.68 -2,194.80 298.73 5,958,361.405 664,486.572 12.00 -469.95 -89.47 1/1012017 831: 15AM Page 3 COMPASS 5000.1 Build 81B BP I/.ig BP Coil Tubing Report BAKER HUGHES ''0''sbp . .s,♦- Reference: Company: North America - ALASKA - BF Project: Prudhoe Bay Site: PB C Pad Well: C-11 TVD Reference: Wellbore: C -11B Mean Sea Level Design: C -11B WP04 Planned Survey MD Inc lusfq 11 11,200.00 89.79 11,219.71 90.00 8 11,300.00 90.00 11,369.45 90.00 10 11,400.00 90.00 11,500.00 90.00 11,600.00 90.00 11,700.00 90.00 11,800.00 90.00 11,900.00 90.00 12,000.00 90.00 12,064.45 90.00 11 TVDSS 12,100.00 90.00 12,200.00 90.00 12,300.00 90.00 12,344.45 90.00 12 (usfq 1 12,400.00 90.00 12,500.00 90.00 12,600.00 90.00 12,624.45 90.00 13 363.51 12,700.00 90.00 12,800.00 90.00 12,900.00 90.00 BP I/.ig BP Coil Tubing Report BAKER HUGHES 1/10/2017 8:31:15AM Page 4 COMPASS 5000.1 Build 878 Local Coordinate Reference: Well C-11 TVD Reference: Mean Sea Level MD Reference: C -11A C 61.83usft (Nabors 2ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Azi TVDSS WS PJW Northing Easting DLeg V. Sec TFace 1°I (usft) (usfq (ust!) (usfq (usf) (°1100mft) (ustq 1°I 97.96 8,960.05 -2,199.42 363.51 5,958,358.202 664,551.435 12.00 -410.66 85.00 100.32 8,960.09 -2,202.55 382.97 5,958,355.496 664,570.960 12.00 -393.44 84.92 109.95 8,960.09 -2,223.49 460.38 5,958,336.252 664,648.802 12.00 -327.86 90.00 118.29 8,960.09 -2,251.85 523.71 5,958,309.286 664,712.736 12.00 -278.05 90.00 114.62 8,960.09 -2,265.45 551.06 5,958,296.281 664,740.367 12.00 -257.01 -90.00 102.62 8,960.09 -2,297.33 645.65 5,958,266.480 664,835.625 12.00 -179.02 •90.00 90.62 8,980.09 -2,308.84 744.80 5,956,257.137 664,934.997 12.00 -89.79 -90.00 78.62 8,860.09 -2,299.49 844.18 5,958,268.658 665,034.140 12.00 6.80 -90.00 66.62 8,960.09 -2,269.68 939.44 5,958,300.540 665,128.721 12.00 106.51 -90.00 54.62 8,960.09 -2,220.71 1,026.42 5,958,351.390 665,214.607 12.00 204.99 -90.00 42.62 8,960.09 •2,154.73 1,101.32 5,958,418.986 665,288.044 12.00 297.94 -90.00 34.89 8,960.09 -2,104.51 1,141.64 5,958,470.075 665,327253 12.00 353.01 -90.00 39.15 8,960.09 -2,076.13 1,163.04 5,958,498.907 665,348.024 12.00 382.82 90A0 51.15 8,960.09 -2,005.74 1,233.81 5,958,570.823 665,417.236 12.00 473.40 90.00 63.15 8,960.09 -1,951.60 1,317.67 5,958,626.776 665,499.888 12.00 570.72 90.00 68.49 8,960.09 -1,933.40 1,358.21 5,958,645.857 665,540.017 12.00 615.04 90,00 61.82 8,960.09 -1,910.08 1,408,59 5,956,670.275 665,589.869 12.00 670.35 -90.00 49.82 8,960.09 -1,854.01 1,491.17 5,958,728.133 665,671.199 12.00 767.13 -90.00 37.82 8,960.09 -1,781.99 1,560.28 5,958,801.637 665,738.722 12.00 856.71 -90.00 34.89 8,960.09 -1,762.30 1,574.78 5,958,821.639 665,752.782 12.00 877.06 -90.00 43.95 8,960.09 -1,704.00 1,622.70 5,958,880.966 665,799.417 12.00 942.04 90.00 55.95 8,960.09 -1,639.78 1,699.11 5.958,946.838 665,874.404 12.00 1,035.81 90.00 67.95 8,960.09 -1,592.85 1,787.21 5,858,995.679 665,961.448 12.00 1,134.64 90.00 1/10/2017 8:31:15AM Page 4 COMPASS 5000.1 Build 878 byBP BP Za •: Coil Tubing Report BAMUR HWHES Company: North America - ALASKA -BP Local Co-ordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB C Pad MD Reference: C-11A @ 61.83usft (Nabors 2ES) Well: C-11 North Reference: True Wellbore: C-11B Survey Calculation Method: Minimum Curvature Design: C-11B WP04 Database: EDM RSK- Alaska PROD -ANCP1 Planned SurveyNo Inc Azi TVDSS NIS EIW Northing Easting DLeg V. Sec TFace (usft) Cl 1°I (usnq I-nl (usl) (usft ) (usrtl (°n0ousry (usft) 1°I 12,904.45 90.00 68.49 8,960.09 -1,591.19 1,791.35 5,958,997.421 665,965.547 12.00 1,139.09 90.00 14 13,000.00 90.00 57.02 8,960.09 -1,547.53 1,876.15 5,959,042.926 666,049.372 12.00 1,233.72 -90.00 13,100.00 90.00 45.02 8,960.09 -1,484.74 1,953.75 5,959,107.387 666,125.575 12.00 1,328.11 -90.00 13,184.45 90.00 34.69 8,960.09 -1,420.09 2,007.91 5,959,173.203 666,178.312 12.00 1,401.12 -90.00 is 13,200.00 90.00 36.75 8,960.09 -1,407.48 2,017.01 5,959,186.003 666,187.132 12.00 1,413.98 90.00 13,300.00 90.00 48.75 8,960.09 -1,334.19 2,084.77 5,959,260.753 666,253.272 12.00 1,502.73 90.00 13,400.00 90.00 60.75 8,960.09 -1,276.59 2,166.29 5,959,320.119 656,333.508 12.00 1,599.03 90.00 13,425.00 - 90.00 63.75 8,960.09 - -1,264.95 2,188.42 5,959,332.238 666,355.373 12.00 1,623.80 90.00 TD at 13425.00 111012017 8:31:15AM Page 5 COMPASS 5000.1 Build 81B 0 0� by 10 BP Coil BP Tubing Ed Fag *Qk Report BAKER MUGMES Company: North America- ALASKA -BP Local Coordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB C Pad MD Reference: C-11A @ 61.83usft (Nabors 2ES) Well: G-11 North Reference: True Wellbore: C-11B Survey Calculation Method: Minimum Curvature Design: C-11BWP04 - Database: EDM RSK- Alaska PROD -ANCP1 Targets - Target Name - hi6miss target Dip Angle Dip Dir. TVD +WS +E7•W Northing Easting • Shape (1) (•) (usf" (usft) just" (usft) (usft) Latitude Longitude I C-11 B Polygon 0.00 0.00 - plan misses target center by 8970.78usft at 13425.00usft MD 0.00 -1,148.37 (8960.09 TVD, -1264.95 N, 2188.42 E) 2,610.52 5,959,458.000 666,774.800 70° 17'43.4T7 N 148° 38'58.269 W ' - Polygon Point 1 0.00 0.00 0.00 5,959,458.00 666,774.80 Point 0.00 228.87 -219.57 5,959,682.00 666,550.30 Point D.00 -542.87 -1,249.74 5,958,886.00 665,537.30 Point 0.00 -1,065.93 -1,712.11 5,958,355.00 665,086.50 Point 0.00 -936.01 -2,439.39 5,958,469.00 664,356.60 Point 0.00 -1,224.83 -2,497.42 5,958,179.00 664,304.90 Point 0.00 -1,350.82 •1,675.72 5,958,071.00 665,129.10 Point 0.00 -1,064.67 -1,220.73 5,958,367.00 665,577.70 Point 0.00 -630.72 -845.94 5,958,809.00 665,942.90 Point 10 0.00 -199.00 -231.72 5,959,254.00 686,547.50 C-11 B T4 0.00 0.00 8,960.00 - plan misses target center by O.10usft at 13424.56usft MO (8980.09 TVD, -1265.14 -1,265.18 N. 2188.02 E) 2,188.04 5,958,332.000 666,355.000 70° 17'42.329 N 148" 39'10.584 W - Point C-11B Fault 2 0.00 0.00 0.00 - plan misses target center by 8997.86usft at 10372.66usft MD (8953.53 TVD, -2,731.61 N, -1,017.97 5,957,796.000 663,182.000 70" 17'27.909 N 148'40'44.021 W -Poygon -2061.38 429.16 E) Points 0.00 0.00 0.00 5,957,796.00 663,182.00 Point 2 0.00 -132.57 1,489.56 5,957,696.00 664,674.00 Point 3 0.00 -371.00 3,336.92 5,957,498.00 666,526.00 Point 0.00 -132.57 1,489.56 5,957,696.00 664,674.00 C-11B Fault 3 0.00 0.00 0.00 - plan misses target center by 8971.48usft at 10372.66usft MD (8953.53 TVD, -2,166.12 N, -986.61 5,958,362.000 663,201.000 70° 17'33.471 N 148° 40'43,109 W - Polygon -2061.38 -429.16 E) Point 1 0.00 0.00 0.00 5,958,362.00 663,201.00 Point 0.00 450.63 1,258.55 5,957,939.00 664,469.00 Point 0.00 -631.76 3,002.13 5,957,796.00 666,216.00 Point 0.00 450.63 1,258.55 5,957,939.00 664,469.00 C-11B T1 0.00 0.00 8,960.00 -2,199.61 - plan misses target center by 0.26usft at 11199.57usft MD (8960.05 TVD, -2199.36 N, 363.09 E) 363.07 5,958,358.000 664,551.000 70° 17'33.142 N 148° 40'3.776 W - Point 1/1012017 8:31:15AM Page 6 COMPASS 5000.1 Build SIB bBP �^' FPS Fag "a��• •� BP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA - BP Vertical Project: Prudhoe Bay Site: PB C Pad Depth Well: C-11 •E74N Wellbore: C -11B (usft) Design: C -11B WP04 (usft( C -11B T3 0.00 0.00 8,960.00 -1,640.61 1,698.69 - plan misses target center by 0.46usft at 12799.14usft MD (8960.09 TVD, -1640.26 N, 1698.40 E) 8,953.53 - Point 429.16 C-11 B Fault 1 0.00 0.00 0.00 -1,772.30 309.39 - plan misses target center by 8964.85usft at 10800.00usft MD (8953.57 TVD, -2088.24 N, -12.54 E) -2,045.32 - Polygon Actual Surey C -11A TIP Point 1 0.00 0.00 0.00 Point 0.00 -133.99 1,874.65 Point 3 0.00 349.33 4,247.94 Point 0.00 -133.99 1,874.65 C-118 T2 0.00 0.00 8,960.00 -2,154.72 1,101.28 - plan misses target center by 0.10usft at 11999.98usft MD (8960.09 TVD, -2154.75 N, 1101.31 E) 8,952.88 - Point -249.10 r 10,485.00 8,953.48 41/2"Planned TOWS 10,855.00 13,425.00 8,960.09 2-7/8" -2,114.14 I - Plan Annotations Measured Vertical Local Coordinates Depth Depth -NI-S •E74N (usft) (usft) (usft( (usft) Comment 10,372.66 8,953.53 -2,061.38 429.16 Actual Survey C -11A 10,463.03 8,953.77 -2,045.32 -340.23 Actual Surey C -11A TIP 10,485.00 8,953.48 -2,041.38 -318.62 KOP 10,505.00 8,953.30 -2,038.23 -298.87 End Weigh 00ft 10,555.00 8,952.88 -2,033.73 -249.10 6 10,855.00 8,954.47 -2,114.14 34,82 7 11,135.00 8,959.43 -2,194.80 298.73 8 11,219.71 6,960.09 -2,202.55 382.97 9 11,369.45 8,960.09 -2,251.85 523.71 10 12,064.45 8,960.09 -2,104.51 1,141.64 11 12,344.45 8,960.D9 -1,933.40 1,358.21 12 12,624.45 8,960.09 -1,762.30 1,574.78 13 12,904.45 8,960.09 -1,591.19 1,791.35 14 13,184.45 8,960.09 -1,420.09 2,007.91 15 13,425.00 8,960.09 -1,264.95 2,188.42 TD at 13425.00 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: 5,958,946.000 5,958,784.000 5,958,784.00 5,958,691.00 5,959,226.00 5,958,691.00 5,958,419.000 4.500 4.500 2.875 4.250 Well C-11 Mean Sea Level C -11A @ 61.83usft (Nabors 2ES) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 665,874.000 70' 17'38.638 N 148' 39'24.049 W 664,486.000 70° 17'37.345 N 148° 40'5.340 W 664,488.00 666,365.00 668,727.00 666,365.00 665,288.000 70' 17'33.583 N 148° 39'42.263 W 111012017 8:31:15AM Page 7 COMPASS 5000.1 Build 81B ?�• by BP FORM .000e BP Coil Tubing Report BAKER HUGHES Company: North America Project: Prudhoe Bay Site: PB C Pad Well: C-11 Wellbore: C -11B Design: C -11B WP04 Checked By: ALASKA -BP Approved By: Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well C-11 Mean Sea Level C -11A @ 61.83usft (Nabors 2ES) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Date: 1110/2017 a 31:15AM Page 8 COMPASS 5000 1 Build 81B bp ProSIM: R CIPli Bay 111Le: PBC Patl WN: C-11 �- Well C-118 PI4n:C-118 WP04(C-/VC-1111) WELL DETAILS: C-11 _. SECTIONDETAYS see MD he Aa mTVD +WS +EFW Dog TFm VSei Ta" 1 1037286 88.64 80.19 8953.53 -2061.38 429.16 0.00 0.00 -1108.31 2 10463.03 91.05 79.33 8953.77 2045.32 44013 2,83 4904-1019.25 3 10485A0 90.49 80.03 895148 -2041,3B 41802 408 128.66 .997.60 4 1050540 90.49 81.93 8953,30 -203813 -298,87 9.00 90.00 -977.96 5 10555.00 90.49 87.83 895248 -2033.73 -249.10 12.00 90.00 .929.65 6 10855.00 86.93 123.80 8954.47 2114.14 34.82 12.00 92.50 090.36 �l 7 11135.00 89.10 90.19 8959.43 4194.80 298.73 12,00 -90.00 469.95 B 11219.71 90.00 100.32 8960.09 -220255 38297 12.00 85.00 .393.44 9 11369.45 90.00 118.29 8960.09 .2251115 523.71 12.00 9040 -278.05 10 12064.45 90.00 34.89 896049 -2104.51 1141.64 12.00 -90.00 353.01 11 12344.45 90.00 68.49 8960A9 -1933.40 135811 12.00 90.00 615.04 12 12624.45 90.00 34.89 8960.09 -1762.30 1574.78 12.90 -90.00 87746 13 12904.45 90.00 68.49 8960.09 -1591,19 1791,35 12.00 90.00 1139.09 14 13184.45 90.00 34.89 8960.09 4420,09 2007.91 12.00 00.00 1401.12 15 13425.00 90.00 63.75 8960.09 -1264.95 2188.42 12.00 90.00 1623.80 a°'�aaM1T^^�e WELLBORE DETAI49: C-118 WpelnMm:lia uymral C -11B S np 8 Boe000l P ---t Wan MID: 10372 amM�ml Tie on MO: 103]2.fi6 slot 4(l() �'M I4E18eM1�mo: WJIL11,iw µaN au�(N01Pobmm AbnbaetpW ANNOTATIONS _6eK) L-11A�fi1AN11 iM OpN Pabaim: k4we2ES1 NO MO Annual 6953.53 1037266 ActUSISUPAYG11A 0m' 8953.77 10463.03 A:bulSumyGIIATIP -32m I 8953.48 10485.00 KOP IOeI., 89513010505.00 End9d40'1000 -2m 0 2m 095288 1055500 6 0954.47 10855.00 7-1' West( -)Bast(+) (200 usft/in) 8959.43 11135.00 8 c 8456. 9960.09 11219.71 9 N -lam. 896D0911369.45 10 85501 - 8960.09 12064.45 11 W.09 12344.45 12 0960.09 12624.45 13 C 6645, 8960 12904.45 14 o -I" 8960.09 13184.45 15 9_ C -111C -[IA 8960.09 13425.00 TDe113425.00 2bm' C-IIBFuu51 IBTI 11EfB>EILEINFCgAP1MN1 - BRIM -/_.■ �'M I4E18eM1�mo: WJIL11,iw µaN au�(N01Pobmm AbnbaetpW , N61P.w�.s S61@61 oWD HUGHES L-11A�fi1AN11 iM OpN Pabaim: k4we2ES1 C-11 B WP04 C -IIA;-IIB -32m I -2m 0 2m 4m 6m 8m IMO 12m 14110 JIM IBM 20m 22011 2400 260 28011 mm 32m 3400 West( -)Bast(+) (200 usft/in) 8456. 85501 - -. C 6645, C-11 B WP04 9_ p 87W' 8935 6 C -I 11C-I',IA C-IIBTI C-IIBTZ C-IIBT3 C-IIB"I'4 � 8930 od O 9025 6 7. 8 Y 10 - 11 12 13 14 IS TDa11342i1X1 KOP 9120 y - AC1uaISm YC-IIA"rIP - 4l F.d9JCy/Imfl W15 F 9310 Meog,laPa Level -17111 -1615 -1520-1415 -13311 -1235 -1140 -1015 -950 855 -76[1 �665 -570 _3 47i 80 285 -190 -95 0 9,5 190 2115 380 475 5711 665 700 X,59 950 II91 1140 1235 1330 142.5 1520 1615 1710 180.5 1900 1995 Vertical Section at 70.00° (95 usft/in) Mean Sea ProlePl: Prudhoe Bay She: Site C1 11 C-11 Wellbore: C41B PIea:C-11BWPN(C.11/C.11B) • �wm� WELLBORE DETAILS: C11B PEFEAEucESSatNaiaa Q u+Pe�rn C -11B coag rom lfral Pe�ere ce watt -it, irve HOM Pv�s1Sp®u Ve2a11N01aefe'rre Ahen a®IoM \ oe�:etAi m. yf�f Parent WaAbore: C -11A Szem lVsl anorerm sbf.lo WrI O.00E7 T wm_aism rre on MD: 10372.fie y„o.�ocem ares. uffa�suwnlxmmr�sl caeuamn uthon lcwu.ncuvwre ri.9 BAKER HUGHES Wes (-)/East(+) (100 usf /in) �N Project: pfodhoe iBay ANTI -COLLISION SETTINGS COMPANY DETAILS: Norah America - ALASKA - OP b p Ste: PB C Pad ��.. Well: terpdalion Method: MD, interval: 25.00 Calculation Method: Minimum Curvature 2 C-11 InDepth Range From: 10372.66 To 13425.45 Error System: ISCWSA BAKER Wellbore: G71 B Results Llmlted By: Centre Distance: 1539.67 Scan Method: Tray. Cylinder North HUGHES Plan: G11B WP04(C-11/C-118) Reference: Plan: C-116 WP04 (C -11/C-118) Error Surface: Elliptical Conk Wannino Method: Rules Based From Colour To MO rwlMe r,w: 01.73 DepthRange: .W� 6nN4n9 �M 4•,.xl ,n• �, �M P 9 10372.66 To 13425.45 10373 10650 ao 6JIU wpn do Possible Magne!10.65Interference: 10650 -- 12100 1 1WM.fib 88hicT !64 80.19 895Ad ss3 -2 lAll 42x16 0.00 TODD -11088..911 From KOP to 10.fi50' MD 0100 2 10483.03 91.05 79.33 895377 -2045.32 -340.23 2.83 -09.64 -1019.25 340 20 12100 12200 3 10485.00 90.49 80.03 0953.8 -2041.30 -318.62 4.06 120.66 -997.60 12200 .12600 4 10505.00 90.49 81.83 8953.30 -203823 -29B.87 9.00 90.00 -977.96 90 5 10555.00 90.49 87.83 8952.88 -2033.]3 .249.10 12.00 90.00 .929.65 12600._-.. .. _12900 6 10055.00 88.93 12380 8954.47 -2114.14 34.82 12.00 92.50 690.36 7 11135.00 89.10 90.19 8959.43 -2194.80 290.73 12.00 .90.00 -069.95 _ 8 11219.71 90.00 100.32 8%0.09 -2202.55 382.97 12.00 05.00 x93.44 320 80 - 12,900 - 13425 9 11369.45 80.00 118.29 8960.09-i!a1.85 523.71 12.00 90.00 -278.05 L�23 ���h1JJt�'3 Ru 10 12064.45 90.00 34.89 8980.09 -210451 1141.64 12.00 -90.00 353.01 C'1 [t3-YVro4 1 12344.45 90.00 68.49 8%0.09 -1933.40 1358.21 12.00 90.00 615.04 70 7, \ 12 12624.45 90.MO 00 34.89 .09 -1762.30 1574.78 12.00 - 877.06 13 12904.45 89.00 66.49 9960.09 -1591.19 1791.35 12.00 W40 1139.09 \ 14 13184.45 WOO 34.09 8860.09 -142049 2007.91 12.00 -90.00 1401.12 15 13425.00 90.00 60 63.75 8950.09 -1264.95 2188.42 12.00 90.00 1623.80 300 �. 0 sugVeyPROd M 50 M9 \ O.a116I2-I2 000 W4NM4:Y44 WMuo: V \\\\�\\\ Ogl6 '.pagh TO SwryMn Tw / \ \\\ \ IC-II SN1 aJS'MS C111 03S GYgD4D C-IIASY,MW0.n+MS(ItAI W. Ge332 C -11A 30 WR66 13425.U0 3-I18(C'ug MWO 280 � �4120� - 106231 \\ 80 10 � ��� 340 0240 20 10574 270 _ 00 app. ,.01 200 ,1 1 72,66 12 6 -0tA 40 10 / ,j C -34A 160 \ 260 20100. 120 60 90 ,�� _80 �, �. \ 40 f C -11A 40 80 2\40 L 06/I.ID I I j 1373 270 9C \ 50 Fal, IA w1Avs i 1b373 240 vca Q$®,ca19vu A V < 6 1, cat 64)ivi. 40 60 , '01,w18PB1,D-e:BPa1Vo. \ -11 0-1113. G11P V4 C 2 1.. C -25e. 6258 V4 \ 80 70 wo, c3a.caoavz' 630.0 cWv1 \ �C34 caw cawvz v j Coach Sl nongo: gn » wq c 3aq Pwrn �P40 7 20 Jose Vazquez-TechsuP0o41rtMpQYanler 80 140 -ca0. ca4 w4v1 .120 714-076-0339 CeIIPhone - G-39. ca9 wa v1 907-341-7604 Emergency w c w, C-39MI ca9Pa1 v3 160 Vorha Ra90v9ingh-survey Manager 907342-2436 Cep Prone 90 - c39.csnd,Ca9APW v7 Tai 51ur0ivant-OO Coordinator 6se.ca9A,ca9nv2 220- 140 907-3111-DDCoor1858 Cap Phone 26U -160 =Owc.Om.0 VI 200 100 - -C-09 Ca9, cm v1 Patrick Rider MWOCoordmalor - .669 ca9agel. 0a 1.l vo 200 290 160 9W -952-34W Cep Phone 180 cas,cu9a,co9e vo a"01ntn E 07_��P Cylinder Azimuth (fFO+AZI) [°] vs Centre to Centre Separation [10 usft/i`� 907.Travelling CylinderAzimuth (TFO+A71) [ 1j 6vs0 Centre to Carlin, Separation 140 us0/in) sp0001e North America - ALASKA - BP Prudhoe Bay PB C Pad C-11 C-11 B C -11B WP04 Travelling Cylinder Report 09 January, 2017 AFag BAKER HUGHES BP WE rag bp Travelling Cylinder Report BAKER 004e HUGHES Company: North America -ALASKA -BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00 usft Reference Well: C-11 Well Error: 0.00 usft Reference Wellbore C -11B Reference Design: C -11B WPD4 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well C-11 Mean Sea Level C -11A @ 61.83usft (Nabors 2ES) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCP1 Offset Datum Reference C -11B WP04 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference To Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 10,372.66 to 13,425.45usft Scan Method: Tray. Cylinder North Results Limited by: Maximum canter -center distance of 1,539.67 usft Error Surface: Elliptical Conic Survey Tool Program Date 1/9/2017 Casing From To Depth (usft) (usft) Survey (Wellbore) Tool Name Description 100.55 8,100.53 C-11 Srvy 1 BOSS -MS (C-11) BOSS -GYRO Sperry -Sun BOSS gyro multishot 8,193.00 10,372.66 C-11ASrvy1 MWD+FIR+MS(C-11A) MWD+IFR+MS-WOCA MWD +IFR+Mufti Station W/O Crustal 10,372.66 13,425.00 C -11B WP04(C-118) MWD MWD - Standard 12.250 9,035.53 8,364.12 — Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft( (usft) Name (in) (in) 2,668.55 2,604.63 133/8" 13.375 17.500 8,193.00 7,625.36 95/8" 9.625 12.250 9,035.53 8,364.12 DRILLING LINER 1 7.000 8.500 10,485.00 8,953.48 41/2"Planned TOWS 4.500 4.500 13,425.00 8,960.09 2-7/8" 2.875 4.250 Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning SRO Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore- Design (usft) (usft) (usft) Waft) PB C Pad C-01 - C-01 - C-01 12,250.00 9,050.00 1,414.11 321.29 1,106.16 Pass- Major Risk C-01 - C -01A- C -01A 12,185.62 10,059.00 223.29 20.79 222.91 Pass - Minor 1/10 C-01 - C-01 B - C-01 B 12,737.70 9,225.00 1,216.16 332.68 893.92 Pass - Major Risk C-01-C-01BPB1-C-01BPB1 12,737.70 9,225.00 1,216.16 332.68 893.92 Pass - Major Risk C-02 - C -02A - C -02A 13,134.40 10,750.00 1,266.32 343.61 922.63 Pass - Major Risk C-04 - C-04 - C-04 Out of range C-04 - C -04A- C -04A Out of range C-04 - C-04APB1 - C-04APB1 Out of range C-04 - C-04APB2 - C-04APB2 Out of range C-04 - C-04APB3 - C-04APB3 Out of range C-04 - C -04B - C -04B Out of range C-04 - C-040 - Plan #5 Out of range C-08 - C-08 - C-08 Out of range C-08 - C -08A - C -DBA Out of range C-08 - C-OSAPBI - C-08APB1 Out of range C-08 - C-088 - C -08B Out of range C-08 - C-08BPB1 - C-08BPBI Out of range C-08 - C -08C - C -OBC Out of range C-08 - C-OBCPBI - C-OSCPBI Out of range C-08 - C-08CPB2 - C-08CPB2 Out of range C -09 -C -09-C-09 11,613.38 9,550.00 650.54 308.10 350.51 Pass - Major Risk C-09 - C -09A - C -09A 11,613.38 9,550.00 650.54 305.88 351.13 Pass - Major Risk C-09 - C -09B - C -09B 11,616.64 9,425.00 662.59 303.06 379.89 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 1/9/2017 1:49:56PM Page 2 COMPASS 5000.1 Build BIB .011% BP BP EPA 4 p Travelling Cylinder Report BAKER �rN't HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00 usft Reference Well: C-11 Well Error: 0.00 usft Reference Wellbore C -11B Reference Design: C -11B WP04 Summary Site Name Offset Well - Wellbore - Design PB C Pad C-09 - C-09BPB1 - C-09BPB1 C-10 - C-10 - C-10 C-10 - C-1 GA - C -10A C-10 - C-1 OB - C-1 OB C-11 - C-11 - C-11 C-11 - C -11A- C-11 A C-12 - C-12 - C-12 C-12 - C -12A - C -12A C-12 - C-12APB1 - C-12APB1 C-12 - C -12B - C -12B C-12 - C -12C - C -12C C-12 - C-12CPB1 - C-12CPB1 C -13 -C -13-C-13 C-13 - C -13A - C -13A C -14 -C -14-C-14 C -15 -C -15-C-15 C-15 - C -15A- C -15A C -18 -C -18-C-18 C-18 - C -18A - C -18A C-18 - C -18B - C -18B C-18 - C-18BPB1 - C-18BPB1 C-19 - C-19 - C-19 C-19 - C-1 9A - C-1 9A C-19 - C-1 9B - C -19B C-19 - C-19BPB1 - C-19BPB1 C-19 - C-1 9C - C-1 9C C-19 - C-1 9C - Plan #6 C-1 9C approved C-20 - C-20 - C-20 C-20 - C -20A- C -20A C-20 - C -20B - C -20B G-20 - C -20C - C -20C C-21 - C-21 - C-21 C-21 - C -21A- C -21A C-22 - C-22 - C-22 G-22 - C -22A - C -22A C-23 - C -23C - G -23C C-25 - C-258 - C -25B C-30 - C30 - C-30 C-30 - C30A- C -30A C-33 - C33 - C-33 C-33 - C -33A- C -33A C-33 - C -33A- Plan #2 C-33 - C33PB1 - C-33PB1 C-34 - C34 - C-34 C-34 - C -34A - C -34A C-34 - C -34A- Plan #2 0-35 - C35 - C-35 C-35 - C35A - C -35A C-35 - C -35B - Ci35B C-36 - C-36 - C-36 C-36 - C -36A- C -36A C-36 - C-36APBI - C-36APB1 1WO17 1:49:56PU Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Reference Offset Measured Measured Depth Depth (usft) )usft) 11,61664 9425.00 Well C-11 Mean Sea Level C -11A @ 61.83usft (Nabors 2ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Centre to No -Go Centre Distance Distance (usft) (usft) 9,400.00 662.59 303.06 11,775.OD 11,250.00 1,325.96 13,146.82 9,400.00 306.99 13,146.83 9,400.00 306.99 13,425.00 8,650.00 1,388.98 12,825.00 11,043.00 534.71 12,775.00 11,000.00 552.72 centre to center distance or Page 3 Allowable Deviation from Plan (usft) 379.89 413.17 909.08 15.28 300.19 6.83 300.62 344.98 1,100.62 369.80 184.85 368.20 193.25 seoamtinn farfnr PR _ min ellinm - -mfr- Warning Pass - Major Risk Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Pass - Major Risk Pass - Minor 1/10 Pass- Minor 1/10 Out of range Out of range Out of range Out of range Pass - Major Risk Pass - Major Risk Pass - Major Risk Out of range Out of range Out of range Out of range Out of range Out of range COMPASS 50001 Build SIB %h eP I/&I 1,� by Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00 usft Reference Well: C-11 Well Error: 0.00 usft Reference Wellbore C -11B Reference Design: C -17B WPO4 Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well C-11 Mean Sea Level C -11A @ 61.83usft (Nations 2ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Summary PB C Pad - C-01 - C-01 - C-01 Reference offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) Vertical (usft) Vertical PB C Pad Onset T.M.. Offset Aolbore Cense Casing- Centre 10 No Go C -39 -C -39-C-39 13,425.00 9,075.00 674.67 371.34 456.96 Pass - Major Risk C-39 - C -39A - C -39A 13,425.00 9,075.00 674.67 372.84 456.02 Pass - Major Risk C-39-C-39APB1-C-39APB1 13,425.00 9,075.00 674.67 372.97 455.90 Pass - Major Risk C-39 - C-39PB7 - C-39PB1 13,425.00 9,075.00 674.67 371.45 456.85 Pass - Major Risk C41 - 041 B - C41 B 8.275.00 8,X8.88 0719 805 50.27 Out of range C -42 -C -42-C-42 5807 1,532.45 12520 1,421.51 Pass - Major Risk 10,75000 Out of range C42-C42A-C42A 6.233]2 87.19 6.12 4940 -823.09 Out of range Offset Design PB C Pad - C-01 - C-01 - C-01 Grew sm Error. ow ase survey Pregnm: 11aC8-GYRO-MS Rule Assigned: Major Risk Onset wtll ERnC 0.0 rte Reference Otrew Semi Major Asia Measured Vertical Measured Vertical Relerence Onset T.M.. Offset Aolbore Cense Casing- Centre 10 No Go Allocable Yeming Mph Mph Mob Death AximuN aN/41 +EIM ibk siaa Co." `,fence GBVYIKn (.at" (awry (.am (rift( loan( leen) rl (usnl la.nl gnl 1.01 lusnl (usft) 1075000 11 8.275.00 8,X8.88 0719 805 50.27 -025.11 407.38 5807 1,532.45 12520 1,421.51 Pass - Major Risk 10,75000 8952.95 8.300.00 6.233]2 87.19 6.12 4940 -823.09 44932 5.687 1.522.84 12534 1,411.98 Pass Major Risk 10)50.00 8952.98 8,325.00 8,250.55 87.19 620 48.53 821.12 45150 5887 1,51382 12548 1.40286 Pass Major Risk 10,750.00 8.952.98 8,38000 8,203.36 87.19 681 47,84 -819.21 45391 6687 1,501,0 12564 1,394.13 Pass-MajorRisk 10,7WM 8,952.98 8,37500 0,308.15 87.19 642 4815 -81733 45852 5687 1,496.40 125.79 1,385.85 Pass - Major Risk 10,75000 0,952.98 8,400.00 8,332.92 87,19 652 4584 4115.50 459:34 5.607 1,488.41 125.95 1378.02 Pass Major Risk 10,750.00 8,952.98 8,425.00 8.357.60 87.19 6.64 8493 -813.71 482.37 5.687 1,480.84 126.11 1,3711.84 Pass - Major Risk 10.75000 8.95298 8,45000 8,38242 87,19 6.76 44.00 -81192 465.45 5687 1473.89 12620 1,38368 Pass - Major Risk 10,750.00 8.952.98 8.475.00 8,407.16 87.19 689 4307 410.10 488.54 5,687 1,486.85 126.44 1,357.13 Pass - Major Risk 10,75872 895307 8.50000 8,43190 87.19 102 43.10 4006,7,/ 47163 5887 1,460.52 12485 1,34955 Pass - Major Risk 10,759.34 895307 8.525.00 8450.61 07.19 7.14 42.20 -800.41 474.73 $887 145461 12490 1.M74 Pass - Major Risk 10.759.90 8,953.05 8.550.00 8,481.39 87.19 725 4140 -804% 477.76 5887 1.41901 12095 1,330.30 Pass - Major Risk 10.760.53 8.953.08 8,575.00 8508.15 87.19 137 40.50 802.83 08069 5807 1,4,13]8 12500 1,333.16 Pan -Mayr Risk 10,761.10 8.953.09 8,0000(1 8530.94 87.19 148 39.50 -801.13 483.51 5607 1,438.84 125011 1,328.%Pass -Minor Risk 1078165 8.953.10 5,825.00 0.555.73 07.19 7.60 MAR -799.49 48824 5.607 1,43123 125.12 1,923.93 Pass - Major Risk 10,762,19 8,953.10 8,85000 8.580.54 87.19 771 3777 -097.88 488.92 5.687 1,42999 125.19 1,319e9 Pass - Major Risk 10,762]2 8,953.11 8,675,00 8.605.30 87.19 7.82 36 Is -79629 49157 5687 1428.15 12526 1,315.94 Pen - Major Risk 10,753.25 8953.11 8.70ols) SA3016 87.19 793 35W -09472 494.19 5687 1422.71 125.32 1,31255 Pen -Maim Risk 10,783]] 8953.12 8,725.00 8656.97 87.19 8.04 34.58 793.16 498.78 5.687 1419.67 12540 1309.60 Pass -Major Risk 10,78129 8953.12 8.750.00 8879.79 87.19 0.16 UZI -79183 499.36 5887 1.41701 12547 1,30699 Pass - Major Risk 10,76481 8,953.13 8,775.00 8,70481 87.19 827 X110 490.11 501.92 5887 1.414.82 12555 1.300.70 Pass - Major Risk 10.755.32 8953.14 8000.0() 8.729.44 87.19 8.39 32.15 -78062 50110 5807 1.413.02 125.61 1,30% Ruk 10.785.84 8,953.14 8.825.00 0,754.28 87.19 851 3121 -787.14 50702 5.887 141181 125.74 1,30151 Pass - Major Ria, 10,775.00 8,95325 8,850.00 8,779.09 87.19 861 31.28 -785.89 509.55 $.687 1.410.77 12476 1.299.22 Pass - Major Risk 10,775.00 8.953.25 8.875.00 880393 87.19 am 30.27 48427 512.07 5.807 141020 12493 1.29863 Pass Major Risk 10,775.00 8,953.25 8,900.00 8,828.76 87.19 am 29.28 78286 51455 5.807 1,41005 125.11 1,290.42 Pass - Major Risk, CC 10.775.00 8953.25 8.92500 8,85360 87.19 9.01 28.24 .78149 51701 5687 1,41030 125.28 1,298.60 Pass - Major Risk 10.775.00 0,953.25 8,950.00 887844 07.19 9.13 27.23 480.13 51969 San 1,410.98 12546 1,299.16 Pass - Major Risk 10,77500 8,953.25 8,975,00 8,903.29 07.19 926 26.22 -778.79 52191 5,687 1,412.08 12563 1,300.11 Pass - Major Risk t0,A5.00 8,953.25 9,000.00 8,928.10 87.19 RM 25.21 -77746 52430 5,687 1,41356 12581 1.301.44 Pines Major Risk 12,250.00 8,950.09 8.025.00 8.952.99 85.54 9.51 -32.56 -776,16 $26.66 5.607 1,414.15 321.09 1,106.23 Pass Major Risk 12,250.00 8960.09 9,05.00 8,977.85 8854 963 -33.57 -774.87 52800 3.687 1,414.11 32129 1,10616 Pas. - Major Risk, ES,W 12,25000 8,98009 9,07500 9,002.72 0854 975 -3457 -773.61 53128 3,687 1,414.52 321 as 1,106.41 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 1/9/2017 1:49:56PM Page 4 COMPASS 5000.1 Build 81B bp BP RAW 1"' Travelling Cylinder Report ��( HUGHES Company: North America -ALASKA -BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00 usft Reference Well: C-11 Well Error: 0.00 usft Reference Wellbore C -11B Reference Design: C -11B WPO4 Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well C-11 Mean Sea Level C -11A @ 61.83usft (Nabors 2ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to C -11A @ 61.83usft (Nabors 2ES) Coordinates are relative to: C-11 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27.OGP-Usa AK / Dentral Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 1.25 ° Ladder Plot 0 0 2500 5000 I I I I I I I I I I I I I I I I I --------------- I I I I I I I I I I I � I 1 I i Measured Depth LEGEND $ C-01,C-01A,C-01AV5 $ C -30,C -30,C -30V1 $ C -01,C-01 B,C-01B V0 $ C-34,G34A,C-34AV2 $ C-01,001,001 V1 -Xf C34,C34A, Plan #2 V2 -W C-01,C-01BPB1,C-01BPB1 VO -A- C -34,034,034V7 1� 011,011A,011AV4 -0- 039,039,039V1 -{- C-25,C-25B4O25BV4 j(- G39,C39PS1,C-39PB1 V3 $ 030,030A,030AV2 -Ar 039,C-39APB1,C39APB1 V7 10000 1 -II- C 39,C-39A,C-39A V2 ♦- G09, C -09A, C -09A Vt -XE C-09,C-09,G09V7 -I� G-09,C-09BPB1,009BPB1 VO i C-09,C-09B,C-09BV0 $ C-02,C-02A,C-02AVO 15000 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 1192017 1:49:56PM Page 38 COMPASS 5000.1 Build 81B BP pTravelling Cylinder Report Bih� HUGHES Company: Project: Reference Site: Site Error: Reference Well: Well Error: Reference Wellbore Reference Design: North America - ALASKA - BP Local Coordinate Reference: Well C-11 Prudhoe Bay TVD Reference: Mean Sea Level PB C Pad MD Reference: C -11A @ 61.83usft (Nabors 2ES) 0.00 usft North Reference: True C-11 Survey Calculation Method: Minimum Curvature 0.00 usft Output errors are at 1.00 sigma C -11B Database: EDM R5K-Alaska PROD -ANCP1 C -11B WPO4 Offset TVD Reference: Offset Datum Reference Depths are relative to C - IIA® 61.83usft (Nabors 2ES) Coordinates are relative to: C-11 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK / Central Meridian is 1501 0' 0.000 W Grid Comergence at Surface is: 1.25 ° Separation Factor $ C01,C-01A,C-01AV5 $ C-01,C-01B,C01BVO t C01,C-01,C-01 V1 -XE C-01,C01BPB1,C01BPB1 VO -rte C-11,C-11A,C-11AV4 -f- C-25,C-25B,C-25BV4 $ C-30,C-30A,C30AV2 LEGEND $ C-30,G30,C-30V1 $ C-34,C-34A,C34AV2 -X- G34,C-34A,Plan#2V2 r 034,C -34,C -34V1 $ C -39,C -39,C -39V1 -F C39,C39PB1,C39PB1 V3 -&- C39,C-39APB1,C39APB1 V7 -+- C-39,C39A,C-39AV2 -0- C-09,C-09A,C-09AV1 -1f C -09,409,C-08 V7 -�- C09,C-0gBPB1,C09BPB1 VO —9— C-09,C09B,C-09BV0 $ C-02,C-02A,C-02AVO CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 1/9/2017 1: 49: 56PM Page 39 COMPASS 5000.1 Build 61B BP I/ad bp p Travelling Cylinder Report BAKM NUGM Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00 usft Reference Well: C-11 Well Error: 0.00 usft Reference Wellbore C -11B Reference Design: C -11B WP04 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well C-11 Mean Sea Level C -11A @ 61.83usft (Nabors 2ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to C -11A @ 61.83usft (Nabors 2ES) Coordinates are relative to: C-11 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK / Central Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 1.25 - Travelling Cylinder l 21 3� 30 � 1800— I 13400 10775 300 122W 1 t1 Sg 60 900 A7 600'x. 13012 12188 270 13118 13150 i \ 90 240 �. ��1950 120 \_ 11450 - '� Inrn 11725 A 11575 210 \_ - ' 2100 150 -180 Azimuth from North [y vs Centre to Centre Separation [1000 usft/in] LEGEND EN $ C-01,C-011A,C01AV5 $ C-30,C30,G30V1 -0- C-39,C39A,C-39AV2 $ C-01,C01B,C-01BV0 -0- C-34,C34A,G34AV2 C-09,C-09A,C-09AV1 -Y- C-01,CO1,C01 V1 -1F C34,0-34A,Plan#2V2 -t- C -09,C -09,C -09V1 -)F C-01,C-01BPB1,C01BPB1V0 $ C -34,C -34,C -34V1 -&- C-09,C09BPB1, C-MBP81 V0 -8- C-11,611A,G11AV4 $ C -39,C -39,C -39V1 -L- C09,C-09B,C-09BV0 -S- C-25,C-25B,G25BV4 -F C39,C19PB1,C39PB1V3 $ C-02,CO2A,C-02AV0 $C-30,C30A,C-3QA\/2 -d- C39,C39AP1311,C39APB1V7 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 1/92017 1:49.56PM Page 40 COMPASS 5000.1 Build 81B Project: Prutlhae Bay Slt�Well: PBC Patl -- — - Well: C-11 - ObpWHWOR: C -11B PYn: GLIB WP04PWe C-1113 0(G11/C-i18) 5958300 6sH+enccnrow.wlron C -11B cpwaaere1m511a0.�mxe weu cll. iLei 5858200 Vmml(NOI6etlg-n9rM Parent Wellboe: C -11A oM 0 MEI 59591. �sue wm namM®91bvM e2B)TleoMO: . CoWbmn�Md Mim w�m 5956000 595]900 5951800 5958100 C-0810 o S o S GPo 5e5e990 5959600 � 5959500 C-OWC-091A 5959900 6'r00 595]900 5959300: C-11IC-11 %0 10IC-10 5959200 9IC 9BP7}1 6500 5959100 C -WC OB - �59960a 5959000 C-2 5/G25B -0�1 10ICOA 5950900 w .8500...... 5500 .. d' - %5950600 o 0 8 8 0 8 8 8 x 8 o 0 Eastlng (100 usiVin) 5950100 o 8 t S i 5950600 -C G-1vC-11A -19099C 5958500 5958300 6sH+enccnrow.wlron C -11B cpwaaere1m511a0.�mxe weu cll. iLei 5858200 Vmml(NOI6etlg-n9rM Parent Wellboe: C -11A oM 0 MEI 59591. �sue wm namM®91bvM e2B)TleoMO: . CoWbmn�Md Mim w�m 5956000 595]900 5951800 5958100 S o S o S Mean Sea Level MmiNum iM NN uw�wm,. i>a s ssn�w Om.vM..efO we.almii uoeaeearsmi WELLBORE DETAILS: 0-11B 6sH+enccnrow.wlron C -11B cpwaaere1m511a0.�mxe weu cll. iLei Vmml(NOI6etlg-n9rM Parent Wellboe: C -11A oM 0 MEI 1037266 �sue wm namM®91bvM e2B)TleoMO: . CoWbmn�Md Mim w�m BAI ER • • Nu�NEs Enw, (100 wf1(n) C�8O6;p p8 fICl0B BP Bt p o Oh C34 34 $ C-39/C-39PBt lC -341C -34A H961D � yip O c p 'B p !t O yh ppp h EPhC-11 B 04 us 500ft M I& , C -011C -01A p 0°'hp hyo app 6500 1*p / \hypo � 0 5959600 n 9500 B9&aC-02A q 5959400 4 f 5959300 0$ s 59592M 0 5959100 5959000 pp C-IW12A 30 by C-12JC-126 5958900 Z G -121C,12 5956800 -' ypp G-121c-1ECP81 m G12/0 -j 2C 5958]00 g -1vF12Ape pp 5958800 S ^p �g 500 d Op ,.5958400 X500 p p C301C-30A 5958100 m� 5e5e990 E000 � C-OWC-091A 595]900 GOWC-WB 10IC-10 9IC 9BP7}1 6500 C -WC OB - �59960a 09/� 09 C-2 5/G25B -0�1 10ICOA w .8500...... ,— - .. d' - $ 8 0 8 8 0 o 0 8 8 0 8 8 8 x 8 o 0 Eastlng (100 usiVin) 0 o 8 by North America - ALASKA - BP Prudhoe Bay PB C Pad C-11 C-11 B C-11 B WP04 Plus 500ft MD AOGCC Offset Well Report 10 January, 2017 RARE BAKER HUGHES 2NarLBP FII • Anticollision Report BAK ~"r HUGH Company: North America -ALASKA -BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 0.00uaft Reference Well: C-11 Well Error: 0oousft Reference Wellbore C -11B Reference Design: C -11B WP04 Plus 500ft MD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well C-11 Mean Sea Level C -11A @ 61.83usft (Nabors 2ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum teference C -11B WP04 Plus 5008 MD 'iher type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference To lterpolation Method: MD Interval 25.00usft Error Model: ISCWSA lepth Range: 10,372.66 to 13,925.00usft Scan Method: Tray. Cylinder North results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic Survey Tool Program pate 1/10/2017 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.55 8,100.53 C-11 Srvy 1 BOSS -MS (C-11) BOSS -GYRO Sperry -Sun BOSS gyro mukishot 8,193.00 10,372.66 C -11A Srvy1 MWD+FIR+MS(C-11A) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 10,372.66 13,925.00 C-11 B WPD4 Plus 500ft MD (C-11 B) MWD MWD -Standard Summary Site Name Offset Well - Wellbore - Design PB C Pad C-11 - C-118 - C-11 B WP04 Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft( (usft) 13,425.00 13,425.00 0.00 1/102017 10: 17:58AM Page 2 of 7 COMPASS 5000.1 Build 81B 04400 BP Fur aI by Anticollision Report BAKM HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB C Pad Site Error: 000usft Reference Well: C-11 Well Error: O.00usft Reference Wellbore C -11B Reference Design: C-11 B WP04 Plus 500ft MD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well C-11 Mean Sea Level C -11A @ 61.83usft (Nabors 2ES) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB C Pad - C-11 - C -11A - C-11 A Survey Program: 101-906SGYRO, 819a VO IFR+MS=CA Reference Onset Measured Vertical fleasVleB VeMcal Offset%Vellbom Centre Ce"w Depth Depth Depth oepth +NIS +EI -W GMre lural (usft) loan) (geff) lose) (ucft) Nem 10,375.00 8953.58 10,376W 0,953.50 -2,080.98 426.85 0.00 10,400.00 8,951.00 10.400.00 8951.o0 -2,OM.66 -40223 0.0D 10,426W 8,954.13 10.425.00 8,954.13 -2,05224 -37782 0.00 10.450.00 8,953.97 10.450.00 8,953.97 -2,047]2 -353.04 0.00 10,47500 8,99.53 10,475.00 8,953.50 -2,043.14 -32840 ow 10,53000 8,99.35 147500.00 895340 -2,030.85 .30384 0.12 10,524.96 8,953.13 10,525.00 9,953.48 -2.03489 .279.15 0.90 10,5tea0 8952.92 10,550.W 8.90.85 -2,03129 -254,42 282 10,574.43 8.952]3 10,57500 8,954.38 -2,027.92 -229.65 5]1 10,59872 8.9959 10.000.00 8,954.02 -2.024.55 -204.80 079 10,022.54 8.952.51 10.025.00 0,955.23 -2,021.18 -180.11 1508 10,60120 8,99.49 10,845.00 8953.55 -2.01810 -160.30 0.19 1/142017 10:17:584M Page 3 of 7 COMPASS 50001 Build 81B I I BP ti by Anticollision Report Company: North America -ALASKA -BP Local Co-ordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB C Pad MD Reference: C -11A @ 61.83usft (Nabors 2ES) Site Error: O.00usft North Reference: True Reference Well: C-11 Survey Calculation Method: Minimum Curvature Well Error: O.00usft Output errors are at 1.00 sigma Reference Wellbore C -11B Database: EDM R5K-Alaska PROD -ANCP1 Reference Design: C -11B WP04 Plus 500ft MD Offset TVD Reference: Onset Datum Far Fag N GHFs Offset Design PB C Pad - C-11 - C-11 B - C-11 B WP04 Survey Program: 101-BOS&GYRO, 8193-MMe1PR-MS-MCA 10371MVID Reference efeet Measure) Vem.1 ARedoun8 Venial OfzetlVellhon Centro Centreto Depth Depth Depth Depth ew-e ♦V -W Centre Poen) Nem leen) Poen), tusnl teem lean) 10,375.00 8953.58 10,37500 0,953.50 -2r%098 426.05 Doe 10400.00 0,95400 10,400.00 8,954.00 -2.056.66 402.23 0.00 10,425.00 8.954.13 10,42500 8,954.13 -2.052.24 -37TW 0.00 10,45000 8,95397 10,450.00 8.953.97 -2.04772 -35304 0.00 10.475.00 8,953.58 10475.00 8,95358 -2,043.14 -ns,46 000 10,500.00 8,953.35 10.500.00 01953.35 -2,038.% -307.52 0.00 10.52500 8,953.13 10.525.00 8,953.13 -2.035.80 -27902 0.00 10.55000 8,952.92 10,550.% 8.952.92 -2,033.94 -254.09 000 10,575.% 8952.73 10,575.00 8,95273 -2,03399 -229.10 0.00 10,800.00 8,952.59 10po0.00 0.952.59 -2,03414 -204.12 0.00 10,825.00 8,95251 1082500 8.952.51 -2.036.20 17921 0.00 10,650.00 895249 10,850.00 8.%2.49 -2,03958 -154.44 000 10.675.00 8.952.52 10,675.00 8,952.52 -2044.21 -129.88 0.00 10.70000 0,952.82 10,700.00 8952.82 .2,050.13 -105.59 0.00 10185.00 8952.T 10]2500 8952.77 -2,057.32 -8165 000 10,750.00 895298 10.75000 0,952.98 -2.065.75 -50.12 000 10,775.00 8,953.25 10.175.o0 8953.25 -2,075.40 -35.06 0.00 10.800.00 8,953.57 10,800.00 0,953.57 -2,08824 -125M 0.00 10,825.00 0,95395 10,825.00 8953.95 -2,09824 9.38 0.00 10,85000 8,954.38 101850.% 8.954.30 -2,111.38 30,65 ew 10187500 8.954.84 10875.00 8,954.04 -2,12491 5158 000 10,900. Do 8.955.31 10,900.00 8,955.31 -2,137.38 8.33 0.00 10,92500 0,955]8 10,925.00 8.955]8 -2,148.87 9582 000 10,950.00 8.958.24 10.95000 8.958.24 2.15080 11847 0.00 10.975.00 8.958]0 10.975.00 8,956.70 .2.167,71 14182 000 11.00000 8957.15 11.000.00 8,957.15 -2,17589 165.60 0% 11.025.00 8957 59 11.025.00 8,957.59 -2,181.01 189.76 0.00 11.050.00 89MM 11.050.00 8,958.03 -2,100.97 21421 0.00 11,07500 8.95845 11,07500 8,95815 -2,190.83 23091 000 11,10000 8,958.87 11,100.00 8958.87 -2,193.40 283.77 000 11,125.00 8,95927 11,125.00 0,959.27 -2,19486 280.73 0.00 11,15ew 0,959.64 11,15000 8.959.64 2,19508 3138 000 11,17500 8,959.% 11175.00 6.959.90 -2.196.00 33867 000 11,20000 8960.05 11200.00 8,asoos -2.199.42 38351 0.00 11,22500 8.%0.09 11225.00 8,960.09 -2203.52 308.17 000 11,250.00 0,%0.09 11,250.00 8%0.09 -2.20891 41258 DOD 11275M 0,950.09 11,27500 8.950.09 2,21558 43867 000 11.300.00 8.95009 11.30000 8,960.09 -2.223.49 45038 000 11,32500 8,%0.09 11,325.00 8,960.09 -2,23263 40385 0.00 11.350.00 8,900.09 11,350.00 8,980.09 -2,242.% 508.40 000 11,375.00 6,980.09 11.37500 8,9110.09 -2.254.45 52861 0.00 11,400.00 6.96009 11.400.00 8,98009 -2,26545 55108 0% 11,425.00 8.960.09 11,425.00 a,8W.09 -2,27527 574.05 0.00 11,450.00 8,96009 11,650.00 sashes -2,28367 597,52 0.00 1117500 8,960.09 11,475 DD 8.960.09 -2,29123 62141 000 11,500.00 8950.09 11,50000 8980.09 -2,297,33 645.65 000 11,525% 0.960.09 11,525.00 6,980.09 -2,30215 670.18 000 11,55000 81980.09 11,550.00 8,96009 -2,305.68 694.92 000 11102017 10:17:58AM Page 4 of 7 COMPASS 5000.1 Build 818 byBP rel Anticollision Report BAKER HUGHES Company: North America - ALASKA- BP Local Coordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB C Pad MO Reference: C-1 IA @ 61.83usft (Nabors 2ES) Site Error. 0.0ou9ft North Reference: True Reference Well: C-11 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore C -11B Database: EDM R5K-Alaska PROD -ANCP1 Reference Design: C -11B WPO4 Plus 500ft MD Offset TVD Reference: Offset Datum Offset Design PB C Pad - C-11 - C-11 B - C-11 B WPO4 aury y Program: 101-809SGYRO, 8193 -MV IPR.M3MCA 103 &MWD Re ,.n.e Oftn M...e V.M.I Mxeme4 wm,.l OBse"Ibom Centra Centre t. Depth Depth Dep, apo .w a .VM Gena Ih41M (ush) Ihenl Ipenl Ipsnl IueIM local 11,57500 8,960.09 11,57500 8.960.09 2.301.92 71982 000 11.600.00 8,980.09 11,890.00 0980.09 -2308N 7"90 O.3 11,62500 0980.09 11.625.00 0980.09 -2308.46 78979 000 ' 11,650.00 8,96009 11.65000 8,06) 09 -2,3W.P ]94.]3 0.00 11,67500 8,980.09 11,875.00 8.98003 -2,303]0 819M 0.00 11,700.00 0980.09 11,73.3 0980.09 -2,299.49 844.18 000 11,72500 0980.09 11,7253 8960.09 -2,29892 868.55 000 11]5000 0.96009 11]5000 0960.09 2.287,08 092.59 000 11,]]500 8.960.09 11,775.00 0%0.03 2.27899 916.24 0.00 11,000.00 81960.09 11.000.00 8,980.09 -2,M9.68 93944 0.00 11.825.00 8.980.09 11.825.00 098009 -2,259.16 982.12 0.3 11.85000 8,980.09 11,850.00 8,980.09 -2.247.47 984.21 000 11,875.00 8,980.09 11,87500 8.930 09 -2,234.85 1,005.8] 0.00 11,90000 093.09 11,900.00 8.83.09 -2,220.71 1,026.42 0.00 11,925.00 8.960.03 11,92500 8,960.09 @,205.71 1,Wfi 42 000 11,950.3 8.93.09 11193.00 0.9309 -2,18968 1,065.60 03 11,9753 8.960.09 11,9753 8.93.09 -2,17288 1,003.92 0.3 12.03.3 B,MM 12.303 8,Mo9 2.154.]3 1,101.32 0.00 12.02500 8.93.09 12.025.00 093.09 -2.135.3 1,11716 000 12,30.00 09309 12.03.3 0,93.09 -2.118.24 1,133.19 03 12,075.3 8,9309 12.075.3 8,980.09 -2,095.92 1,14277 03 12,13.3 803.09 12.13.3 8,960 US -2.076.13 1,183.04 0.00 12.125.3 8,93.09 12.125.3 8,93 .3 -2,057.17 1,17992 0.00 12.15000 8,980.3 12,15000 8,93 .09 -2,3908 1198.58 0.3 12,17500 8.93.09 12,175.00 area) 09 -202193 1,214.76 0.3 12200.3 8.960.09 12.260.3 0,960.09 -2,00574 1,233.81 0.00 12,225.3 0,93.09 12,2253 09M.W -1.99058 1,253.3 0.00 12,250.3 8,9M.09 12,25000 8.93.09 -1,976.48 1,27432 0.00 12.2!500 09309 12X15.00 8.9309 -0,983.47 1.29567 03 12,300.00 8,980.09 12,33.00 0.96009 895180 1,31]8] 03 12,325.00 098009 12,325.00 8,980.09 -1,940.3 1,340.26 0.00 12.350.3 8,960.09 12.350.3 8,93.3 -1.93134 1,38396 0.00 12.375.3 093.09 12.3]5.00 0980.3 -1.921.30 1,388.25 03 12,40000 8.96.09 12,43.00 8,93.09 -1,91008 1.408.59 000 12,425.00 8.960.09 12,42500 8,960.09 -1,89].70 1430.30 000 12.450 00 0960.09 12,450.3 8,980.09 -1,08421 1,45134 0.00 12,475.00 0,%0.09 12.4]5.3 8.953 US -1.869.3 1,47165 ON 12,9303 8 9610 12,500.3 8.9309 -1,851.01 1491.17 0.3 12,525.00 6.%0.09 12,525.00 09M.09 -1,837,39 1,50984 0.3 12,55000 8,9309 12,53.00 0.960.09 -11819.81 1,527.61 0.00 12,575.00 8,MOO 12,575.3 8,960.09 -1,801.33 1,51444 000 12,60.3 8,9M.09 12,3000 6.93.09 -1,]8199 1.560.28 0.3 12.6253 8,93.3 12.82500 8,9M.09 -1.761.85 1,575.09 000 12.550.00 8,931.3 12.850.00 8,93.09 -1,741,74 1.589.94 0.00 12,675.00 @931.09 12.67500 a M.00 -1,72244 1,805.83 0.00 12.73.00 8,980.09 12,73.3 0,96.09 1,701.00 1,622.]0 0.00 12,]2500 SM09 12,]2500 8,9MOg -1.68647 1.640.6 0.3 12,750.00 0.960.09 12,750.00 093.09 -1,39.89 1,659,22 0.3 1/102017 f 0:17:58AM Page 5 of 7 COMPASS 5000.1 Build 81B I le �b BP Race Oke p Anticollision Report BAKER HUGHES Company: North America -ALASKA- SP Local Co-ordinate Reference: Well C-11 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB C Pad MD Reference: C -11A Q 61.83usft (Nabors 2ES) Site Error: O.00usft North Reference: True Reference Well: C-11 Survey Calculation Method: Minimum Curvature Well Error: O.00usft Output errors are at 1.00 sigma Reference Wellbore C -11B Database: EDM R5K-Alaska PROD -ANCP7 Reference Design: C -11B WPO4 Plus 500ft MD Offset TVD Reference: Offset Datum Offset Design PB C Pad - C-11 - C-11 B - C-11 B WP04 Survey Fmgnm: 101-80$&GYRO.819&M IFReM&WOCA 1037&MWD Reference Ofeet Measured Vertical Measured VerBcel OM4MYMIbete GMro cont - Depth Depth Depth Depth aw-a -w4V Depth, (-airy (-010 (ue91) NaRI (--ft) 0010 (Usm 12,7500 8,960.09 12,775.00 sash 09 -1,65431 167877 000 12 ,50.5 8,980.09 12800.00 8,960.09 -1,63978 1,689.11 0.00 12,825.00 6.960.09 12.825.00 8960.09 -1,828.33 1,72r1.19 000 12,85000 8,960.09 12.850.00 8,960.09 -1,814.00 1.741.93 0.00 12,87500 8980.09 12,87500 8,960.09 -1,5283 1,764.29 000 12,900.00 8.960.09 12,90000 8,960.09 -1,592.85 1,787.21 000 12,92500 8.911009 12,92500 8,96eeg -1,58325 1,810.29 0.00 12.950.00 8WD09 12,950.00 895.09 -1,57250 1,632.Be 0.00 12.W5.00 805.09 12,975.00 8,96009 -1,500.58 1,85183 0.00 1300000 8.969.09 13000.00 8980.09 -1.50.53 1,878.15 000 18025.00 8,980.09 13,025.00 89110.09 -1,533.38 1,895.76 0.00 13,05000 8,960.09 13.05000 set, 09 -1,518.17 1,918.59 000 13,07500 8,960.09 13,075.00 8,9a0.09 -1.50194 1.935.61 0.00 13,100.00 8,960.09 13,10.00 8,960.09 -1.484.74 1,951.75 000 13,125.00 8960.09 13,12500 896009 -1,406.62 1,9mN 000 13,150.00 9,960.09 13,150.00 8,95 .09 -1,44762 1,98720 000 13,175.00 8960.09 13,17500 8.95eN -1.42779 2,002,3 000 13,20000 8,96009 13.20000 8980.09 -1,407 48 2,017.01 000 13.225.09 8,960.09 13,225.00 8980.09 -1,387,65 2,032.49 0.00 13.250.00 8.960.09 132511.00 898009 -1,38805 2,01897 000 13,27500 8,960.09 13.275.00 8,96009 -1,351.16 2.086,2 000 13,30000 8,960.09 13.300.00 8.960.09 -1.334.19 2084.77 0.00 13,32500 8,96009 13,32500 896009 -1,31821 2,103.99 000 13,35000 8,960.09 13.35000 8,950 09 -1.30325 2,124.02 am 13,375.00 8,980.09 13.375.00 8,960.09 -1.25.37 2,144.81 0.00 13,45.5 8,860.08 13,400.5 8,9509 -1,27859 2,111629 0.00 13,425.00 states 13,42500 8.95.09 4.28495 2,180.42 000 13,42545 8,95.09 13,42545 8.95.09 -1,264]5 2,199.82 0.00 1/10/2017 10,17:58AM Page 6 of 7 COMPASS 5000.1 Build BIB by BP FGFag S : Anticollision Report SAM ` HUGHES Company: North America -ALASKA -BP Project: Prudhoe Bay Reference She: PB C Pad Site Error: O.00usft Reference Well: C-11 Well Error: O.00usft Reference Wellbore C -11B Reference Design: C-11 B WPO4 Plus 500ft MD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well C-11 Mean Sea Level C -11A @ 61.83usft (Nabors 2ES) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to C -11A @ 61.83usft (Nabors 2ES) Coordinates are relative to: C-11 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Use AK Central Meridian is 150° 0' 0.000 W ° Grid Convergence at Surface is: 1.25° 1/10/201710:17.56AM Page 7 of 7 COMPASS 5000.1 Build 81B Well Blank 13.3 it ')R2 -AC BOP Schematic 'e Quick Test Sub to Otis - - 7.7tt —'- - - - - Top of]"Otis � T1 CL Flow Tee 16.2 h �-COR2 Rig's Drip Pan Distances from top of riser CL of SSV 17,8 fl Excluding quick -test sub } Top of Annular 0.0 it 7-1/16" Sk Flange %T' ORs Box 19.0 ft BOP] \� Hydril 71/16" Top Annular Element 0.7tt Annular Bottom Annular CL Blind/Shears 3.3ft Blind/Sh., -saw CL 2-3/8" Combf's 4.1 ft Deployment CL 3" Pipe/Slips CL 2-3/8"x3-1/2" VBRs e1 az Kill Line CL Blind/Shears CL 2-3/8" Combi's 10.7 ft CL of Top Swab 13.3 it -Swab 2 CL of Bottom Swab 7q.g ft �/ Swab 1 � T1 CL Flow Tee 16.2 h BOP2 CL of SSV 17,8 fl Master 2 } Fumble CL of Master Valve 19.0 ft BOP] Master 1 LDS Gound Level OA T2 Test Pump Hose Davies, Stephen F (DOA) From: Hyatt, Trevor <Trevor.Hyatt@bp.com> Sent: Tuesday, January 17, 2017 12:35 PM To: Davies, Stephen F (DOA) Subject: RE: PBU C-11 B (PTD #217-002) - Question Here is a table of other H2S level's at other wells nearby along with the C -11A measurement. Let me know if you need anything else. Parent Well (if sidetrack) #1 Closest SHL Well 112S Level #2 Closest SHL Well H2S Level #1 Closest BHL Well 112S Level #2 Closest BHL Well 112S Level #3 Closest BHL Well 112S Level Max. Recorded 112S on Pad/Facility Trevor Hyatt BP Exploration (Alaska), Inc. Coil Tubing & RWO Drilling Engineer Trevor. HvattC@bp.com Work: 907-564-4627 Cell: 907-223-3087 Well Name H25 Level Reading Date Comments C -11A 20 ppm 4/3/15 C -33A 22 ppm 1/14/16 C-12 20 ppm 4/16/15 C -02A 10 ppm 1/28/16 C-21 16 ppm 5/24/16 C -32C 9 ppm 5/3/16 C -33A 38 ppm 4/6/11 From: Davies, Stephen F (DOA) [mailto:steve.davies@alaska.gov] Sent: Tuesday, January 17, 2017 11:12 AM To: Hyatt, Trevor Subject: PBU C -11B (PTD #217-002) - Question Trevor, BP's Permit to Drill application for PBU C -11B (PTD #217-002) states that C -Pad at Prudhoe is not an H2S pad. Could you please provide me with the latest H2S measurements from well C -11A and from the other nearby wells drilled from C - Pad? Thank you. Regards, Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviesPalaska.¢ov. TRANSMITTAL LETTER CHECKLIST WELL NAME: � e- PTD: 2(-7_G-� 2 -- /Development Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: u �x� POOL:C<d / Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL (If last two digits No. , API No. 50 - Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50-_ -� from records, data and logs acquired for well (name on pit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Comnanv Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Companv Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 PTD#:2 Company BP EXPLORATION N.(ALA$KA11 C.- Initial Class/Type _Well Name: PRUDHOE BAY UNIT -11B _ _program DEV_ _ Well bore seg l_ / PEND GeoArea $90 Unit Administration Administration 1 — Permit fee attached- - _ NA -DEV _ 11650_ On/Off Shore On Annular Disposal ❑ 2 Lease number appropriate - - _ - - Yes _ Entire Well lies within ADL0028305. 3 Unique well name and number _ - _ _ - _ - - _ Yes- 4 Well located in a defined pool Yes PRUDHOE BAY, PRUDHOE OIL POOL - 64015, govemed by CO 341F 5 Well located proper distance from drilling unit boundary Yes CO 341 F, Rule 2: There shall be no restrictions as to well. spacing except that no pay shall be 6 Well located proper distance from other wells Yes opened in a well closer than 500 feet to the boundary of the affected area. Planned well to CO 7 Sufficient acreage available in. drilling unit Yes _conforms 341F, Rule 2. 8 If deviated, is wellbore plat. included - Yes 9 Operator only affected party - Yes 10 Operator hasappropriate bond in force - - Yes 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes SFD 1/17/2017 13 Can permit be approved before 15 -day wait - Yes 14 Well located within area and. strata authorized by Injection Order # (put. 10# in comments) (For NA 15 All wellswithin1/4 mile area of review identified (For service well only) NA 16 Pre -produced injector: duration. of pre -production less than 3 months (For. service well only) NA 17 Nonoonven, gas conforms to AS31,05.030Q.1.A),Q.2.A-D) _ _ _ _ _ NA Engineering 18 Conductor string provided _ - _ _ NA Conductor set in PBV C-11 19 Surface casing. protects all -known USDWs - NA Surface casing set in PBU C-11 20 CMT vol adequateto circulate. on conductor & surf csg NA Surface casing set and fully cemented 21 CMT vol adequate to tie-in long string to surf csg. NA 22 CMT will cover all known productive horizons Yes Productive interval will be completed with cemented production perforated 23 Casing designs adequate for C, T, B & permafrost. - Yes -liner _and 24 Adequate tankage or reserve pit Yes Rig has steel tanks; all waste to approved disposal wells 25 If. a. re -drill, has a 10-403 for abandonment been approved Yes - PTD 203-048,. Sundry 317-020 26 Adequate wellbore separation proposed - Yes Anti -collision analysis complete; Major risk failures: C-01A&C-30, both P&A'd, C -30A - will be SI 27 If diverter required., does it meet regulations NA Appr Date 28 Drilling fluid. program schematic & equip list adequate Yes - Max formation pressure is 3276 psig(7.16 ppg EMW); will drill w/ 8.4. ppg EMW VTL 1/31/2017 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put prig in comments). Yes - MPSP is 2396 psig; will test BOPs to 3500.psig 31 Choke manifold complies w/API. RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes _ _ 33 Is presence of H2S gas probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (For service well only) NA Geology 35 Permit can be issued w/o hydrogen sulfide measures No -- —_ C -Pad wells are 112S -bearing. H2S measures are required. 36 Data. presented on potential overpressure zones Yes Planned drilling ram 4 - - 9 mud program 9- (about 8..ppg) appears adequate to control operator's forecast Appr Date 37 Seismic analysis of shallow gas. zones- _ _ _ _ NA pore pressure gradient (about 7.2 ppg). Should higher pore pressures be encountered, SFD 1/17/2017 38 Seabed condition survey (if off -shore) NA - BP has immediate access to nearby fluid. mixing facilities. 39 Contact name/phone for weeklyprogress reports [exploratory only) Geologic Engineering Public Commissioner: Date: C issioner. Date Commissioner Date &'s fil ) )7 4 � _1-17 z[. I,g