Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
217-019
DATA SUBMITTAL COMPLIANCE REPORT 2/20/2018 Permit to Drill 2170190 Well Name/No. PRUDHOE BAY UNIT R -28A MD 12010 TVD 8649 Completion Date 11/19/2017 REQUIRED INFORMATION Mud Log No DATA INFORMATION List of Logs Obtained: MWD/GR/Res Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name ED C 28848 Digital Data ED C 28848 Digital Data ED C 28848 Digital Data ED C 28848 Digital Data ED C 28848 Digital Data ED C 28848 Digital Data ED C 28848 Digital Data ED C ED C ED C ED C ED C ED C ED C 28848 Digital Data 28848 Digital Data 28848 Digital Data 28848 Digital Data 28848 Digital Data 28848 Digital Data 28848 Digital Data Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-22273-01-00 Completion Status 1-0I1- Current Status 1 -OIL UIC No Samples No V/ Directional Survey Yes f Log Log Run Scale Media No (from Master Well Data/Logs) Interval OH / Start Stop CH Received Comments 8957 12010 12/6/2017 Electronic Data Set, Filename: R- 28A_LW D_ FINAL_ FIELD_COMPOSITE_16NOV 2017 BHI CTK.Ias 12/6/2017 Electronic File: 11584922.pdf ' 12/6/2017 Electronic File: R-28A_USR 11584922_PostRun06_10-16-17.pdf• 12/6/2017 Electronic File: R - 28A GR Res _16112017_MD_FINAL_FIELD_BHI- _CTK.cgm 12/6/2017 Electronic File: R- 28AGR_Res _ 16112017_TVDSS_FINAL_FIELD _BHI_C_TK.cgm 12/6/2017 Electronic File: R- P 28A_GR_Res_ 16112017_MD_FINAL_FIELD_BHI- _CTK.pdf 12/6/2017 Electronic File: R - 2 8A GR_ Res_ 16112017_TVDSS_FINAL_FIELD f _BHI_CTK.pdf 12/6/2017 Electronic File: R -28A Field Surveys.csv ' 12/6/2017 Electronic File: R -28A Field Surveys.xlsx ' 12/6/2017 Electronic File: R -28A Final Survey Report.pdf 12/6/2017 Electronic File:.R-28A Final Survey Report.txt - 12/6/2017 Electronic File: R-28A_25_tapescan_BHI _CTK.txt - 12/6/2017 Electronic File: R-28A_5_tapescan_BHI_CTK.txt . 12/6/2017 Electronic File: R-28A_output.tap - AOGCC Pagel of 2 Tuesday, February 20, 2018 DATA SUBMITTAL COMPLIANCE REPORT 2/20/2018 Permit to Drill 2170190 Well Name/No. PRUDHOE BAY UNIT R -28A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-22273-01-00 MD 12010 TVD 8649 Completion Date 11/19/2017 Completion Status 1-0I1- Current Status 1 -OIL UIC No ED C 28848 Digital Data 12/6/2017 Electronic File: R- 28A_GR_Res- 16112017—MD—FINAL—FIELD—BHI. _CTK.tif ED C 28848 Digital Data 12/6/2017 Electronic File: R - 28A_ GR_ Res_ 16112017_TVDSS_FINAL_FIELD ' BHI CTK.tif Log C 28848 Log Header Scans 0 0 2170190 PRUDHOE BAY UNIT R -28A LOG HEADERS Well Cores/Samples Information: Name INFORMATION RECEIVED Completion Report 6 Production Test InfonnatioroNA Geologic Markers/Tops COMPLIANCE HISTORY Completion Date: 11/19/2017 Release Date: 3/22/2017 Description Comments: Compliance Reviewed By: Sample Interval - Set Start Stop Sent Received Number Comments Directional / Inclination Data Mud Logs, Image Files, Digital Data Y /.189 Core Chips Y Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files O Core Photographs Y Daily Operations Summary D Cuttings Samples Y/6 Laboratory Analyses Y / Date Comments Date: AOGCC Page 2 of 2 Tuesday, February 20, 2018 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL-OMPLETION OR RECOMPLETION REP( AND LOG i• Y DEC 13 2017 la. Well Status: Oil 0- Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1b. Well 20AAC 25.105 20AAC 25.110 Development ® Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WOSPL ❑ No. of Completions: One Service ❑ St2tigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 11/19/2017 217-019 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 11/9/2017 50-029-22273-01-00 4a. Location of Well (Governmental Section): 8. Date TO Reached 16. Well Name and Number: 11/15/2017 PBU R -28A 9 Ref Elevations KB 51.20 17. Field/Pool(s): Surface: 585' FSL, 716 FWL, Sec.32, T12N, R13E, UM • Top Of Productive InfeN61: 795' FSL, 1181' FEL, Sec. 31, T12N, R13E, UM GL 18.74 • BF 19.84 PRUDHOE BAY, PRUDHOE OIL 10. Plug Back Depth(MD/TVD): 18, Property Designation: Total Depth: 1838' FSL, 3627' FEL, Sec. 31, T12N, R13E, UM • 11985'/8650' ADL 028279' 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11, Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 634371 • y- 5977049 Zone - ASP 4 12010'/ 8649' 77-028 12. SSSV Depth (MD/TVD): 20Thickness of Permafrost MD/TVD. TPL x- 632468 y- 5977226 Zone - ASP 4 Total Depth: x- 630000 y- 5978223 Zone - ASP 4 None 1900' (Approx.) 5. Directional or Inclination Survey: Yes m (attached) No ❑ 13. Water Depth, if Offshore: 21, Re-dnn/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) , 9249'18710' ' 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and panted lags within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, diameter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD/GR/RES 23, CASING, LINER AND CEMENTING RECORD CASING WT, PER FT GRADE SETTING DEPTH MD SETTINGDEPTHTVD HOLESIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" Conductor 37' 117' 37' 117' 30" 260 sx Arctic Bel(Approx.) 10-3/4" 45.5# L -Be 36' 3022'' 36' 3021' 13-1/2" 2182 cu ft AS III, 400 cu 8 Class'G', 44 sx Class'G' 7-5/8" 29.7# L -BUNT -95 32' 9181' 32' 8651' 9-5/8" 1250 cu ft Class'G', 673 sx Class'G' 5-1/2" 17# 13CM0 8916' 9249— 6422' 8710' 8-1/2" 202 cu ft Class'G' -1/2"x3-1/4" 9.3#/6.6# lwre 8854' 12001' 8369' 8650' 4-1/4" 164 sx Class'G' X2-718" 1 /6.5# 24. Open to production or injection? Yes ® No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation GRADE DEPTH SET (MD) PACKER SET (MDrV Size and Number): 4-1/2" 12.6# 13Cr80 8925' 8678'/ 8220' 2" Gun Diameter. 6 sof 8839'18356' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10320'-10420' 8647'-8646' r. �n9oi _c.i�xi 10570'- 11630' 8649'- 8637' 11830'- 11985' 8650'- 8650' r Was hydraulic fracturing used during completion? Yes ❑ No IZZ , Per 20 AAC 25.283 (i)(2) attach electronic and printed - - I information L v- DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 2500' Freeze Protect w/ 50 Bble Diesel, 5 bbls Meth 27. PRODUCTION TEST Date First Production: December 1, 2017 Method of Operation (Flowing, gas lift, etc.): Flowing Dale of Test12/6/17 Hours Tested: Protluction for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: 6 Test Periotl y 1]3 508 11 176 2926 Flow Tubing 200 Casing Press: Calculated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity- API (con1: Press 350 24 Hour Rate --111 692 2025 44 N/A Fong 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only RBDMS ISL DEC 14 2017 28. CORE DATA Conventional Cores) Yes ❑ No 0 Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+ND of top and bottom of each), and summarize: lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No 0 Permafrost- Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 9194' 8662' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Sag River 9194' 8882' Shublik 9241' 8703' Kicked off from Parent Well 9249' 8710' (R-28) Sadlerochit-Zone 4 9332' 8773' Sublik (Invert) 9570' B778' Sag River 9920' 8676' Formation at total depth: Sag River (From Base) 9920' 8676' 31. List of Attachments: Summary of Daily Drilling Reports, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Leemhuis, Jacob Authorized Title: Info and D fo aller Contact Email: Jacob. Leemhuts@bp.com Authorized Signature: ale; 12-113/1-7 Contact Phone: +1 907 564 4989 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska, Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item Ia. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other Item 41b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MO and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05-030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only VYaLFEAD= FMC ACTUATOR= DATE REV BY COMMENTS OKB= 51.2' REF ELE/= sir BF. ELE/ = 19.84' KOP= 5200' SPF NIERVAL Opn/Sg2 SHOT Da 2" OH 10320-10420 O 11/18/17 Max Angle = 113° @9620' 1D-3/4" CSG PATCH, tum ND= NA 45.5#, L-80 BTC, tum ND= SB00'SS D=10.05' 5/8' CSG PATCH, 29.7#, L-80 BTC, D = 6.875' 10-3/4- CSG, 45.5#, L-80 BTC, D = 9.950' -i Minimum ID = 2.377" @ 9838' 3-1/4" X 2-7/8" XO 4 -12 -TBG, 12.6#, 13CR-80 .0152 bpf, D = 3.958" TUB14G STUB (10/261091 -� ITOPOF 3-12" X 3-1/4' X 2-7/8' LNR I 1 5T 1 1 8916' 1 4-12' TBG, 12.60,13CR FOX, —� .0752 bpf, D = 3.958' 7-5/8" CSG, 29.7#, NT95SH NSOC, D = 6.875' —C 3-1/2' LNR, 9.3#, 13CR-8G STL, .0087 bpf, D = 2:992' 5-12' LNR, 17#, NT13CR-80 FL4S, .0232 bpf, D = 4.892' R CAFETY NOTES: WELL ANGLE > -70° @ 9383'. R-2 v AAX DIS: 382° @ 9383'. —CHROM E TUBING & 2017' 4-12' X NIPPLE, D = 3.813' 2861' 7-5/e' ES CEMENTER GAS LFT MANDRILS REV BY PERFORATION SU�/TNARY DATE REV BY COMMENTS 07107192 RTL= LOG MAD GR LOG ON 11/17/17 MD I TVD ANGLEAT TOP PERF: 92° @ 1032V 1 TYPEI Note: Refer to Froduction DB for historical pert data SIZE SPF NIERVAL Opn/Sg2 SHOT SOZ 2" 6 10320-10420 O 11/18/17 1 2' 6 1057D-11630 O 11118/17 16 2' 6 11830-11985 O 11/18/17 R CAFETY NOTES: WELL ANGLE > -70° @ 9383'. R-2 v AAX DIS: 382° @ 9383'. —CHROM E TUBING & 2017' 4-12' X NIPPLE, D = 3.813' 2861' 7-5/e' ES CEMENTER GAS LFT MANDRILS =2.441' —j 12001' x- 8670' 7-51W x 4-12" BKR S-3 TCR, D = 3.875' 8704' 4-12' X NPFLE, D = 3.813' 7-5/8' X 4-12" UNDUE OVERSHOT 7-518' x 4-1/2' BM SABL HYDRA P'�2 PICT, D = 3.875- 3.70" DEPLOYMENT SLV, D = 3.00" 3-1/2- X NP, D = 2.812" 4-12" PKR SWS NP. D = 3.813' 8914'—�4-1/2' RCR SWN NP MILLED T( R976' 7-5/8' X 5-12' LNR HGR, 1) 8911' BMD TT LOGGED 07/19/92 9_ 22W 1y3 -V2- X 3-1/4- XO, D=Z.78ti- I MILLOUT WINDOW (R -28A) 9249' - 9259- =2.441' 259' DATE REV BY CONVENTS DATE REV BY COMMENTS 07107192 ST MD I TVD I DEV 1 TYPEI VLV LATCH PORT DATE CTD SIDETRACK [R -211A) 4 3590 3589 1 KBG2 DONE BK 16 11/30/17 12/06117 GIB/JM] GLV C10 (11/30/17) 3 5834 5802 26 1 KBG2 SO BK 20 111/30/17 27574 7288 31 KBC2 OMY BK 0 12I01/i6 1 8562 8121 32 1 KBG2 DW BK 0 12101/16 =2.441' —j 12001' x- 8670' 7-51W x 4-12" BKR S-3 TCR, D = 3.875' 8704' 4-12' X NPFLE, D = 3.813' 7-5/8' X 4-12" UNDUE OVERSHOT 7-518' x 4-1/2' BM SABL HYDRA P'�2 PICT, D = 3.875- 3.70" DEPLOYMENT SLV, D = 3.00" 3-1/2- X NP, D = 2.812" 4-12" PKR SWS NP. D = 3.813' 8914'—�4-1/2' RCR SWN NP MILLED T( R976' 7-5/8' X 5-12' LNR HGR, 1) 8911' BMD TT LOGGED 07/19/92 9_ 22W 1y3 -V2- X 3-1/4- XO, D=Z.78ti- I MILLOUT WINDOW (R -28A) 9249' - 9259- =2.441' 259' DATE REV BY CONVENTS DATE REV BY COMMENTS 07107192 ORIGINAL COMPLETION 12112/17 JNUJND ADDED BF & REF aEV 11/06109 DIG RWO 11/19117 N-CDR2 CTD SIDETRACK [R -211A) 11/27117 JIMD DRLG HO COPoiECTKM 11/28117 JUJMJ FNALOOEAPPROVAL 12/06117 GIB/JM] GLV C10 (11/30/17) PRUDHOE BAY UNIT V1ELL: R -28A PERIAT W: 217-019 AR No: 50029-22273-01 SEC 32, T12K R1 3E. 585' FSL & 718' FWL BP Brploration (Alaska) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 11/6/2017 21:00 - 0000 3.00 RIGU_j P PRE REVIEW PROCEDUREAND CONDUCT PJSM WITH TRUCKING CREW AND NABORS CREW FOR MOVING RIG. 11/7/2017 00:00 North America - ALASKA- BP Page 1 of 15 RIGU Operation Summary Report 0600 Common Well Name: R-28 AFF No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/6/2017 End Date: 11/16/2017 X3-018DM-C: (2,519,260.00 ) Project: Prudhoe Bay Site: PB R Pad RIGU Rig Name/No.: CDR -2 Spud Date/Time: 6/21/1992 12:00 OOAM Rig Release: 11/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI'. USA00000324 Active datum: KB @51.20usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 11/6/2017 21:00 - 0000 3.00 RIGU_j P PRE REVIEW PROCEDUREAND CONDUCT PJSM WITH TRUCKING CREW AND NABORS CREW FOR MOVING RIG. 11/7/2017 00:00 - 06:00 6.00 RIGU P 0600 - 10:00 RIGU P 4.00 10:00 - 12:30 2.50 RIGU P 12'.30 - 15'.30 3.00 RIGU P 1530 - 1545 0.25 RIGU P 15.45 - 18:00 2.25 RIGU P 18:00 - 19:00 1.00 BOPSUR P REVIEW USE OF 12X12 STOP BLOCK, STOP COMMAND AND GOOD RADIO COMMUNICATIONS. PULL MUD MODULE AWAY AND STAGE AT ENTRANCE TO PAD. PULL SUB AWAY FROM WELL. INSTALL JEEPS UNDER BOTH MODULES FOR ROAD TRAVEL. PRE MOVE RIG FROM DS04 TOWARD R -PAD AT 0600. ESTIMATED DISTANCE -27 MILES PRE CONTINUE MOVING RIG TO R PAD. _ '- RIG ON LOCATION @ 10:00 HRS PRE PJSM. SPOT MUD MODULE FIRST, DUE TO TIGHT QUARTERS AT END OF PAD. WSL VERIFIED CASING PRESSURES PER SOP REVIEW PROCEDURE AND CONDUCT PJSM WITH TRUCKING CREW AND NABORS CREW FOR MOVING RIG. .- REVIEW USE OF 12X12 STOP BLOCK, STOP COMMAND AND GOOD RADIO COMMUNICATIONS. -SPOT SUB OVER WELL WITH WSL, DRILL SITE OPERATOR AND TP WITNESSING - FINALIZE SPOT ON MUD MODULE. SET DOWN "'RIG ACCEPTED 12:30 HRS"' PRE RIG UP VARIOUS COMPONENTS. - RIG UP TO BE ABLE TO MONITOR I/AAND O/A, BOTH AT 0 PSI. - PERFORM ALL ITEMS ON PRE WELL CHECK LIST. PRE UNANNOUNCED H2S/RIG EVACUATION DRILL. -WELL SECURED, PAD OPERATOR NOTIFIED -ALL HANDS MUSTERED TO MUSTER AREA, HEAD COUNTACCURATE. -AAR. HANDS REPORTED WHERE THEY WERE WHEN THE ALARM SOUNDED. -ALARM WAS HEARD BYALL HANDS. TIME TO MUSTER / HEAD COUNT 3 MINUTES 10 SECONDS. - DISCUSSED ACTUAL GAS RELEASES FROM EXPERIENCE AND WHAT WE DID RIGHT. PRE COMPLETE RIG UP CHECKLIST PRE PJSM AND PREPARE FOR N/U BOPE. - NIPPLE DOWN TREE CAP FLANGE - N/U 7 1/16" X 5M BOP STACK. - STACK CONFIGURATION AS FOLLOWS: TOP TO BOTTOM: 7 1116'X 5M. ANNULAR PREVENTOR, BLIND SHEARS, 2-3/8" PIPE / SLIPS, MUD CROSS - 3" PIPE / SLIPS, 2 3/8" X 3-1/2" VBR, MUD CROSS, BLIND SHEARS, 2-3/8" PIPE SLIPS. Printed 12/4/2017 10:51:38AM "All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: R-28 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 11/6/2017 End Date: 11/16/2017 X3-018DM-C(2,519,260.00) Project: Prudhoe Bay Site: PB R Pad Rig Name/No.: CDR -2 Spud Date/Time: 6/21/1992 12:00:OOAM Rig Release: 11/19/2017 Page 2 of 15 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000324 Active datum: KB @51.20usft (above Mean Sea Level) Date From - To Hm Task Code NPT Total Depth Phase Description of Operations (hr) _ _ (usft) 1900 - 1930 0.50 BOPSUR P PRE PJSM, REVIEW BOPE TEST PROCEDURE. - DISCUSS PRESSURE CROSSCHECK USAGE - DISCUSS ROLES AND RESPONSIBILITIES DURING TESTING '- FUID PACK LINES AND BLEEDAIR FROM BOPE -PERFORM SHELLTEST. GOOD TEST. L— _ _ BLEED DOWN _ 1930 - 0000 4.50 BOPSUR P PRE TEST ROPE TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MINUTES EACH - TEST WITH 2-3/8" x 3.0" x 3.5' MULTI -JOINT '- ALL RAMS TESTED ON RAM LOCKS - ALL TESTS CHARTED, SEE ATTACHED BOP TEST CHARTS -TEST WITNESS WAIVED BY AOGCC REP BRIAN BIXBY 11/8/2017 00:00 - 0230 2.50 BOPSUR P PRE CONTINUE TO TEST BOPE TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MINUTES EACH - TEST WITH 2-3/8" x 3.0" x 3.5" MULTI -JOINT -ALL RAMS TESTED ON RAM LOCKS -ALL TESTS CHARTED, SEE ATTACHED BOP TEST CHARTS -TEST WITNESS WAIVED BY AOGCC REP BRIAN BIXBY - CONDUCT ACCUMULATOR DRAWDOWN TEST 1 FAIL/PASS (88 HCR VALVE) 02.30 - 05:30 3.00 RIGU P PRE PRESSURE TESTED C-9 AND C-10 (BACKWARDS). PUMP SLACK FORWARD - FLUID PACK COILAND PUMP SLACK - TEST INNER REEL VALVES TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH SIMOPS: GREASE VALVES IN TREE AND CHECK BOLT TORQUES ON TREE 0530 - 0800 2.50 WHSUR P PRE INSTILLED UQC AND CHECKS TESTED SAME 3500 PSI/ OK 0800 - 09'00 1.00 WHSUR P PRE DISPLACED COIL TO DRILLING MUD. - DISPLACED COIL VOLUME (58.3 BBLS). 0900 - 12:30 3.50 WHSUR P PRE PJSM. -RIG UP VALVE CREW TOOLS AND LUBRICATOR. -PRESSURE TEST LUBRICATOR/ 3500 PSI 15 MIN, GOOD. - LATCH INTO TWC AND PULL, SEE 280 PSI SITPAND VERIFY.. - CLOSE MASTER VALVE, CLOSE SWAB VALVE, PERFORM LTT ON MASTER VALVE, GOOD. - RIG DOWN LUBRICATOR AND TOOLS. Pnnted 12/4/2017 10:51.38AM *Ail depths reported in Drillers Depths' North America -ALASKA - BP Page 3 of 15 Operation Summary Report Common Well Name: R-28 APE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/6/2017 End Date: 11/18/2017 X3-018OM-C: (2,519,260.00 ) Project: Prudhoe Bay Site: PB R Pad Rig Name/No.: CDR -2 Spud DateTme: 6/21/1992 12:00:OOAM Rig Release: 11/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000324 Active datum: KB @51.20usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) _ 12:30 - 15:45 3.25 KILLW P PRE PJSM. BULLHEAD KILLING WELL - HIGHLIGHT GOOD COMMUNICATION TECHNIQUES - DOUBLE CHECK VALVE ALIGNMENT, WALK LINES - REVIEW PRESSURE CROSS CHECK LIST. - LINE UPAND PUMP 5 BELS METHANOL SPEAR. - LINE UPAND PUMP SLICK KCL. - INITIAL RATE/ PRESSURE = 5 BPM @ 500 PSI. - PUMP 270 BBLS KCL, FOLLOW W/ 27 BELS OF 125,000 LSRV PILL @ 2BPM / 25 PSI. - CHASE THAT WITH 8.54 PPG DRILLING MUD @ 5 BPM / 300 PSI. - PUMP 125 BBLS DRILLING MUD, 5 BPM @ 300 PSI FCP. _ _ 1545 - 1800 2.25 EVAL P PRE BLOW DOWN LINES. LINE UP TO THE COIL. - PUMP @ 3 - 4 BPM AND SEE RETURNS AFTER PUMPING 27 BBLS. - INITIAL LOSS RATE WHILE PUMPING 3 BPM / 150 BPH. - LOSS RATE DROPS TO 103 BPH AFTER 10 MINUTES. - CONSULT TOWN, DECISION MADE TO MIX CALCIUM CARBONATE PILL. - GET MATERIAL COMING AND CONTINUE TO MONITOR LOSS RATE. -LOSS RATE @17:00 HRS =54 BPH. TOWN AGREES TO GO AHEAD AND MAKE UP WINDOW MILLING BHA. - WILL MAKE UP WINDOW MILLING BHAAND RIH WHILE PILL IS BEING MADE. 18:00 - 19:00 1.00 STWHIP P 119.00 WEXIT MU 3.80" MILL ON BHI SMART TOOLS TO 119' BHALENGTH - 2-7/8" STRAIGHT BAKER X-TREME MUD MOTOR -MILL 3.80" GO, 3.79" NO-GO, STRING REAMER 3.78" GO, 3.77" NO-GO _ 1900 - 21:15 2.25 STWHIP P 9,249.00 WEXIT RUN IN THE HOLE WITH 3.80" MILLING BHA FROM THE TOP OF THE BHAAT 119' MD TO : THE TOP OF THE WHIPSTOCK AT 9249' MD. - POWER ON TOOLS, PRESSURE TEST QUICK TEST SUB - LOG DOWN FOR TIE-IN FROM 9050' TO 9102' MD WITH -13' CORRECTION - NO ISSUES PASSING THROUGH JEWLERY IN TUBING 21:15 - 00:00 2.75 STWHIP P 9,249.00 WEXIT MILL 3.80" WINDOW IN 5.5" LINER PER BAKER REP FROM TOP OF WHIPSTOCK 9249' MD TO 9253' MD - TOW @ 9251' MD - MILL WINDOW WITH AUTO DRILL AT 1 FPH - RATE: 2.89 BPM IN, 2.35 BPM OUT - MUD WEIGHT: 8.63 PPG IN, 8.66 PPG OUT - DWOB: 0.4 - 2.5 KLBS - FREE SPIN: 2580 PSI - INITIAL LOSS RATE AT FULL PUMP RATE _ 100 BPH - LOSSES HEALED TO -36 BPH WHILE Printed 12/4/2017 10:51:38AM *All depths reported in Drillers Depths' North America - ALASKA- BP Page 4 of 15 Operation Summary Report Common Well Name: R-28 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date: 11/6/2017 End Date. 11/16/2017 X3 -0180M -C: (2.519,26(L00) Project: Prudhoe Bay Site: PB R Pad Rig Name/No.: CDR -2 Spud Daterrime: 6/21/1992 12:00:OOAM Rig Release: 11/19/2017 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000324 Active datum: KB @51.20usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) 11/9/2017 00:00 - 06:00 6.00 STWHIP P 9,257.00 WEXIT MILL 3.80" WINDOW IN 5.5" LINER PER BAKER REP FROM TOP OF WHIPSTOCK 9253' MD TO 9257' MD - TOW @ 9252' MD - MILL WINDOW WITH AUTO DRILL PER WELL PROGRAM - RATE: 2.88 BPM IN, 2.49 BPM OUT - MUD WEIGHT: 8.59 PPG IN, 8.61 PPG OUT - DWOB: 3 - 4 KLBS - FREE SPIN: 2600 PSI - LOSSES HEALED TO -25 BPH WHILE MILLING WINDOW 0600 - 11:00 5.00 STWHIP P 9,261.00 WEXIT MILL 3.80" WINDOW IN 5.5" LINER PER BAKER REP TO 9261'. MD - TOW @ 9251' MD BOW @ 9261'. - MILL WINDOW WITH AUTO DRILL PER WELL PROGRAM - RATE: 2.88 BPM IN, 2.49 BPM OUT - MUD WEIGHT: 8.59 PPG IN, 8.61 PPG OUT - DWOB: 3-4 KLBS _ - FREE SPIN: 2600 PSI 11:00 12:30 1.50 STWHIP P 9,271.00 WEXIT MILL 10'OF RATHOLE. 9261'-9271'. - 2.83 BPM IN / 2.58 BPM OUT. 8.6 PPG IN / 8.55 PPG OUT. - WOB 3-4K, ROP 5 FPH, 2675 PSI ON BOTTOM DRILLING PRESSURE. _ - GOOD INDICATION OF SHUBLIK IN SAMPLES 12:30 - 13:00 0.50 STWHIP P 9,271.00 WEXIT DRESS WINDOW. 46K UP WT, 20K DOWN - MAKE (3) PASSES @ l' / MIN UPAND DOWN. - DRY DRIFT, WINDOW IS SMOOTH. 1300 - 15.00 2.00 STWHIP P 9,271.00 WEXIT PJSM. PICK UP ABOVE WINDOW, - FLOW CHECK, (10) MIN, 8.6 PPG MUD IN AND OUT. - OPEN EDC. - POOH, PUMPING 3.3 BPM @ 2350 PSI. - PAINT FLAG @ 9200' BIT DEPTH, (YELLOW). - CONTINUE OUT OF HOLE W/ WINDOW MILLING BHA. - 9 - 10 BELS LOST WHILE POOH. _ 15:00 - 1700 2.00 DRILL P 9,271.00 PROW BREAK OFF BHAAND LAY DOWN COMPONENTS - FLOW CHECK WELLAT SURFACE - WINDOW MILLAT 3.80" GO, 3.79" NOGG, NO EXCESSIVE WEAR NOTED. - SWAP OUT TO BHA#2, MU HCC 3.75" X 4.25" BI -CENTER BIT ON LOW SPEED MOTOR AND BHI SMART TOOLS TO BHA LENGTH OF 79.49' _MD 1790 - 1930. 2.50 DRILL P 9.271.00 PROD1 RUN IN THE HOLE WITH 3.75" X 4.25" BUILD BHA TO BOTTOM AT 9271' MD - POWER UP TOOLS AND PRESSURE TEST QUICK TEST SUB - SLACK OFF WEIGHT RIH AT 16K, MW IN AND OUT 8.67 PPG - TIE IN WITH GAMMA, -16CORRECTION; CHECK FLAG PAINTED AT 9200' MD (FLAG OFF BY -6') - RIH TO WINDOW, PUWAT WINDOW 51K Printed 12/4/2017 10:51:38AM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 5 of 15 Common Well Name: R-28 MD AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 11/6/2017 End Date: 11/16/2017 X3-013DM-C(2,519,260.00J Project: Prudhoe Bay Site: PB R Pad WINDOW ECD: 10.52 PPG CHOKE Rig Name/No.: CDR -2 Spud Date/Time: 6/21/1992 12:00:00AM Rig Release: 11/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. -LOSSES AT-15SPH BPUOI: USA00000324 Active datum: KB @51.20usft (above Mean Sea Level) ODE Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr)(usft) - MONITOR THE WELL FOR 10 MIN AT THE TOP OF THE WINDOW (MINOR LOSSES) 19:30 - 23:30 4.00 DRILL P 9,504.00 PROW DRILL 4.25° BUILD FROM 9271' MD TO 9504' 2330 - 0000 0.50 DRILL P 11/102017 0000 - 0200 200 DRILL P 0200 - 03:30 1.50 03:30 - 06:15 1 2.75 06:15 - 10'.30 4.25 1030 - 1345 3.25 13:45 - 16:45 3.00 DRILL P DRILL I P DRILL P DRILL P DRILL P Printed 12/4/2017 10:51:38AM *All depths reported in Drillers Depths' MD - FREE SPIN: 2620 PSI, 2.88 BPM - RATE: 2.88 BPM IN, 2.65 BPM OUT. CIRC PRESSURE: 2620-2850 PSI - MUD WEIGHT: 8.57 PPG IN, 8.67 PPG OUT, WINDOW ECD: 10.52 PPG CHOKE PRESSURE:0 PSI -ROP: 120 FT/HR, WOB: 2-4 KLBS -LOSSES AT-15SPH - NO MPD DUE TO LOSSES, APPROVED BY ODE 9,504.00 PROW PULL OUT OF THE HOLE FROM 9504' MD TO 9200' MD - MONITOR THE WELL FOR 10 MIN AT THE TOP OF THE WINDOW (MINOR LOSSES) -PUMP OUT AT 3.31 BPM - NO ISSUES PULLING THROUGH WINDOW 9,504.00 PROW PULL OUT OF THE HOLE FROM 9200' MD TO SURFACE -MONITOR WELLAT 200' MD (MINOR LOSSES) - PUMP OUT OF THE HOLE AT 3.33 BPM 9.504.00 PROD1 CHANGE OUT BHA .-C/O BIT, MOTOR, HOT AND DGS -BIT GRADE: I -I -CT -G -X4 -NO -BHA - 5 BPH STATIC LOSS RATE WHILE CHANGING OUT BHA _ __SERVICE TOPDRIVE 9,504.00 PROD? RIH W/ LATERAL SECTION BHA. - TIE IN W/ GAMMA, MINUS 11' CORRECTION. 1 -CONTINUE ON IN THROUGHT WINDOW, NO ISSUES. - CLOSE EDC AND BRING ON PUMPS, 2.8 BPM IN / S.3 BPM OUT. - TAG UP @ 9506' 9,504.00 PRODi DRILL 101' LATERAL FROM 9506' MD TO 9607' MD (8711' TVD) - FREE SPIN: 2650 PSI, 2.85 BPM - RATE: 2.87 BPM IN, 2.77 BPM OUT. CIRC PRESSURE: 2850 - 3050 PSI - MUD WEIGHT: 8.65 PPG IN, 8.66 PPG OUT, ECD: 9.85 PPG - ROP: 10 - 20 FT/HR, WOB: 2 - 4KLBS - ALOT OF FAST DRILL OFFS AND SUBSEQUENT PICK UPS IN THIS SECTION. - SAW FAULT @ 9570' -GEOLOGIST... SAMPLES INDICATE WE ARE IN SHUBLIK 9,656.00 PROD? DRILLAHEAD, TURNING DOWN TO ADJUST FOR GEOLOGY. - DRILL F/ 9607'- 9656'. (8695 TVD) - BIT SEEMEDA LITTLE SLOW RESPONDING BUT CAME AROUND - 2.86 IN / 2.79 OUT 12750 PSI FREE SPIN / 2875 - 2950 ON BOTTOM - WOB 3 - 5K, ROP 15 - 25 FPH. 9,735.00 PROD? CONTINUE TO DRILLAHEAD F/9656'-9735'. - MADE 150' WIPER @ 9705'. - 2.881N 12.78 OUT 2875 PSI ON BTM. 8.65 PPG IN / 8.62 PPG OUT Printed 12/4/2017 10:51:38AM *All depths reported in Drillers Depths' Common Well Name: R-28 Event Type: RE-ENTER- ONSHORE(RON) Project: Prudhoe Bay Rig Name/No.: CDR -2 North America - ALASKA - BP Pape 6 of 15 Operation Summary Report Start Date: 11/6/2017 End Date: 11/16/2017 Site: PB R Pad Spud Dale/Time: 6/21/1992 12:00:OOAM Active datum: KB @51.20usft (above Mean Sea Level) Date From - To Him Task (hr) 1645 - 0000 7.25 DRILL AFE No K3-018DM-C: (2,519,260.00 ) Rig Release: 11/19/2017 Code NPT Total Depth Phase Description of Operations P 11/11/2017 0000 - 0400 4.00 DRILL P 0400 - 0600 2.00 DRILL P 0600 - 0700 1.00 DRILL P 0700 - 10:00 3.00 DRILL N 10 00 - 1045 0 75 DRILL N (usft) 9,860.00 PROD1 CONTINUE TO DRILLAHEAD F/9,735'-9,860'. - MADE 100' WIPER @ 9750". - 2.94 BPM IN / 2.86 BPM OUT - 8.63 PPG IN 18.67 PPG OUT - AT 9,780' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. - ROP 15 - 25 FPH, WOE 3 - 5K. '- AT 9,850' PUMP 5 BBLS LO/HI VIS SWEEPS AROUND. -AT 9,850 PULL 150' WIPER TRIP. CLEAN PASS UP AND DOWN. 47K UP WT, 23K SLACKOFF WEIGHT. 9,951.00 PROD1 DRILL 4.25° LATERAL FROM 9,860' MD TO 9,951' MD - FREE SPIN: 2,650 PSI, 2.93 BPM - RATE: 2.93 BPM IN, 2.88 BPM OUT. CIRC PRESSURE: 2,650-2,850 PSI - MUD WEIGHT: 8.63 PPG IN, 8.67 PPG OUT, ECD: 9.76 PPG -ROP: 10-30 FT/HR, WOB: 3-4 KLBS - AT 9,920' PUMP 5 BBLS LO / HI VIS SWEEPS ,AROUND. 9,951.00 PROD? PERFORM LONG WIPER TRIP TO WINDOW FROM 9,951'MD - RATE: 2.91 BPM IN, 2.66 BPM OUT. CIRC PRESSURE: 2,730 PSI - 12K OVERPULLAT 9,800' MD, -7K ON DWOB. - PULL THROUGH WINDOW, SLIGHT DRAG SEEN HERE. - OPEN EDC, PUMP BOTTOMS UP IN TUBING AT 4.06 BPM / 3,100 PSI. - SIGNIFICANT INCREASE IN CUTTINGS W/ BOTTOMS UP. - UP TO THE TUBING TAIL, BACK TO THE WINDOW (2X). 9,95100 PROD1 TROUBLE GETTING BACK DOWN THRU WINDOW. - TAG MULTIPLE TIMES TRYING VARIOUS ORIENTATIONS. - CONSULT SWSLAND ODE. AGREE TO POOH F/. WINDOW MILLING BHA. 9,951.00 PRODt POOH W/ LATERAL DRILLING BHA. - JET OUT @ 3.8 BPM 13200 PSI. - MAINTAIN 9.8 - 9.9 ECD WHILE POOH. - FLOW CHECKAT SURFACE, (10 MIN), 8.6 PPG MUD IN AND OUT, WELL BORE STABLE. - PJSM ON BHA CHANGE WHILE FLOW CHECKING WELL. 9,951.00 PROD1 INJECTOR OFF @ 10:00 HRS. - POOH AND HANG BACK LATERAL BHA. - RIH W / WINDOW MILLING BHA. - INJECTOR BACK ON WELL @ 10:30 HRS. - TEST OTS @ 3500 SPI, GOOD. 1045 - 1200. 1 25 DRILL N 9,951.00 PROD? RIH W/ WINDOW MILLING BHA TO DRESS WINDOW - RIH @ 90 FPM /.37 BPM IN /.77 BPM OUT / 285 PSI. Printed 12/4/2017 10:51.38AM •All depths reported in Drillers Depths' North America - ALASKA -BP Operation Summary Report Page 7 of 15 Common Well Name'. R-28 AFE No Event Type: REENTER- ONSHORE (RON) Start Dale. 11/6/2017 End Date: 11/16/2017 X3-018DM-C'. (2,519,260.00 ) Project: Prudhoe Bay Site: PB R Pad Rig Narne/No.: CDR -2 Spud Date/Time: 6/21/1992 12:00:OOAM Rig Release: 11/1912017 Rig Contractor: NABORS ALASKA DRILLING INC. SPUOI: USA00000324 Active datum: KB @51.20usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ _ (usft) 12:00 - 15:15 3.25 DRILL N 9,951.00 PRODI TIE IN W/ GAMMA, MINUS 7'. UP WT 45K, DOWN WT 27K. - BRING ON PUMP, 2.78 BPM IN, 2.69 BPM OUT/ 2625 PSI. - TAG @ 9252'& STALL, PICK UP AND RUN BACK DOWN SLOWLY. - TAG AND MILL THROUGH OBSTRUCTION IN 'SHORT ORDER. - BAKER WINDOW SPECIALIST OPINES IT LOOKED LIKE IT MAY HAVE BEEN A LIP. - MAKE SEVERAL PASSES THIRD THE 'WINDOW, UP AND DOWN. - DRY DRIFT WITH NO ISSUES. RUN IN TO 9299' AT MINIMUM RATE. - CLEAN, SO PICK UP 7O 9275', OPEN EDC AND JET WHIPSTOCK TRAY. - PUMPING 3.85 BPM / 3015 PSI. NOT MUCH COMING OVER SHAKER THROUGHOUT THIS OP. 1515 - 17'.30 2.25 DRILL N 9,951.00 PRODI POOH W/ WINDOW MILLING / DRESSING BHA. I '- EDC OPEN, 3.88 BPM IN / 3.30 BPM OUT PULLING 95 FPM. . - OBSERVE SHAKER WHILE JETTING OUT OF _ —_HOLE_, VERY CLEAN. 1730 - 18'.00 _ 0.50 DRILL N 9,951.00 PRODI CONTINUE POOH WITH BHA#4. HOLD 9.8 PPGAT THE WINDOW. 1800 - 1900 1.00 DRILL N 9,951.00 PRODI STOP AT 188', FLOW CHECK WELL. CLOSE EDC. FLOW CHECK IS STATIC. REVIEW PROCEDURE FOR CHANGING BHA. OPEN RISER AND INSPECT LAST 50' OF CT FOR WEAR SPOTS, NONE SEEN. INJECTOR OFF AT 11ii LAY DOWN MILLING BHA#4, MILL IS 3.79" GO 3.78" NO GO. REAMER IS 3.79" NO-GO. MAKE UP LATERAL BHA #5 WITH HCC BIT WITH P104 CUTTERS. INJECTOR ON AT 19:00. 1900 - 21 30 2.50 DRILL N 9,951.00 PROD1 RIH WITH 4.25" DRILLING BHA Ill. - RATE: 0.48 BPM IN, 0.89 BPM OUT. CIRC PRESSURE: 1,190 PSI. - KEEPING 9.8 PPG AT THE WINDOW. - MUD WEIGHT: 8.55 PPG IN, 8.67 PPG OUT 21:30 - 00:00 2.50 DRILL N 9,951.00 PROD1 ATA DEPTH OF 7,890' THE E -STOP FOR THE VFD WAS INADVERTANTLY ACTIVATED. PUMP, INJECTOR AND REEL ALL CAME TO A STOP. INFECT EQUIPMENT BEFORE CONTINUING OPERATIONS. GOOSENECK SUPPORT IS BENT. MAKE NOTIFICATIONS TO SR WSLAND WELLS SUPT. DISCUSS WITH NABORS ANC MANAGEMENT. DECISION IS MADE TO SWAP OUT THE GOOSENECK SUPPORT. DEVELOPA RISK ASSESSMENT AND PROCEDURE FOR THE SWAP. CONTINUE HOLDING 9.8 PPG AT WINDOW WITH 3-6 BBUHR LOSS RATE WHILE SWAPPING GOOSENECK SUPPORTS. Printed 12/4/2017 10:51:38AM 'All depths reported in Drillers Depths' Common Well Name: R-28 Event Type: RE-ENTER- ONSHORE(RON) Project: Prudhoe Bay North America - ALASKA - BP Page 8 of 15 Operation Summary Report StartDate: 11/6/2017 End Date. 11/16/2017 Site: PB R Pad AFE No K3-018DM-C: (2,519,260,00) Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000324 Active datum: KB (ID51.20usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ 11/12/2017 00:00 - 02:30 2.50 DRILL N 9,951.00 PROD1 DEVELOPA PROCEDURE AND RISK 02:30 - 0330 1.00 0330 - 0500 1.50 05:00 - 08:15 3.25 0815 - 0830 0.25 08:30 - 09:45 1.25 0945 - 10:00 0.25 10100 - 10'.30 0.50 DRILL N 9,951.00 PROD1 DRILL P 9,951.00 PROD? DRILL P 10,130.00 PROD? DRILL P i 10,130.00 PROD? DRILL P 10,250.00 PROD? DRILL P 10,250.00 PROD? DRILL P 10,281.00 PRODI Printed 12/4/2017 10:51:38AM 'All depths reported in Drillers Depths' ASSESSMENT FOR CHANGING OUT THE GOOSENECK SUPPORT. DISCUSS WITH ONCOMING CREW. REMOVE DAMAGED GOOSENECKAND LOWER IT DOWN INTO PIPE SHED. RIG UP NEW GOOSENECK SUPPORT AND LIFT IT TO RIG FLOOR. REVIEW PROCEDURE FOR INSTALLING NEW GOOSENECK SUPPORT. USE TUGGERS TO LIFT GOOSENECK SUPPORT IN PLACE AND PIN IT INTO POSITION. CONTINUE HOLDING 9.8 PPG AT WINDOW WITH 3-6 BBUHR LOSS RATE WHILE SWAPPING GOOSENECK SUPPORTS. AFTER CHANGING SUPPORT, ROLL CT BACK AND INSPECT, NOTHING SEEN. CONTINUE RIH. TIE-IN DEPTH, CORRECT -2 FT. PASS THROUGH WINDOW WITH NO ISSUES. RIH TO BOTTOM, KEEP AS DRILLED TFAND REDUCE RATE TO 1 BPM THROUGH SHALES. '- NO ISSUES GETTING TO BOTTOM, HOLE WAS VERY CLEAN AND SMOOTH - TAG @ 9951' DRILL 4.25" LATERAL FROM 9951' MD TO 10,130' MD (8604' TVD) - FREE SPIN: 2675 PSI, 2.85 BPM - RATE: 2.88 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 2900-3050 PSI - MUD WEIGHT: 8.65 PPG IN, 8.66 PPG OUT, ECD: 9.91 PPG - ROP: BUILT FROM 35 TO 75 FPH FT/HR, WOB: 2— 4KLBS PERFORM 150' WIPER TRIP. - 5 BELS LO VIS / 5 BBLS HI VIS SWEEP AHEAD OF WIPER. - 10 - 15% INCREASE IN CUTTINGS OVER SHAKER. DRILL 4.25" LATERAL FROM 10,130' MD TO 10,250' MD (8599' TVD) - FREE SPIN: 2675 PSI @ 2.85 BPM - RATE: 2.88 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 2900-3050 PSI - MUD WEIGHT: 8.65 PPG IN, 8.66 PPG OUT, ECD: 9.92 PPG - ROP: 115 FPH FT/HR, WOB: 2 — 4KLBS PUMP 5 BBLS LO / 5 BBLS HI VIS SWEEP AHEAD OF WIPER TRIP - WIPER TRIP, (150'), SLIGHT INCREASE IN CUTTINGS. DRILL 4.25" LATERAL FROM 10,250' MD TO 10,281' MD (8599' TVD) - FREE SPIN: 2675 PSI @ 2.85 BPM - RATE: 2.88 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 2900 - 3050 PSI - MUD WEIGHT: 8.65 PPG IN, 8.66 PPG OUT, ECD: 9.92 PPG - ROP: 110 FPH FT/HR, WOB: 2 — 4KLBS 5 X 5 Q%AMPD eucen North America - ALASKA - BP Operation Summary Report Common Well Name: R-28 Event Type: RE-ENTER- ONSHORE(RON) Start Date: 11/6/2017 AFE No End Date: 11/1612017 X3-018DM-C.(2,519,260. 00) Page 9 of 15 � .,ay Rig Name/No.: CDR -2 Spud Date/Time: 6/21/1992 12:00 OOAM Rig Release: 11/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000324 Active datum: KB @51.20usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 10:30 - 13:00 2.50 DRILL P 10,281.00 PROD1 WIPER TRIP TO TUBING TAIL. (8925') - ELECTED TO PERFORM WIPER TRIP EARLY TO ENSURE NO CUTTINGS BUILD UP. - WITH SWEEP OUTAT BIT, LET IT GET AHEAD AND CHASE TO WINDOW - NO ISSUES WITH WELL BORE. PULLABOVE WINDOW AND OPEN EDC. - PUMP @ 4 BPM / 3125 PSI. DID NOT OBSERVE SIGNIFICANT INCREASE IN CUTTINGS. - WELL WORC SHOWS.49 BBLS CUTTINGS RECOVERED DURING WIPER. - RBIH, TIE IN, ADD T CORRECTION. CLOSE EDC ABOVE WINDOW. - CONTINUE IN HOLE, SMOOTH, HOLE IS IN GOOD SHAPE. 13:00 - 16:30 3.50 DRILL P 10,547.00 PROW DRILL 4.25" LATERAL FROM 10,281' MD TO 10,550'MD(8599' TVD) - FREE SPIN: 2675 PSI @ 2.85 BPM - RATE: 2.88 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 2900-3050 PSI '- MUD WEIGHT: 8.65 PPG IN, 8.66 PPG OUT, ECD: 9.92 PPG -ROP: 130 FPH FT/HR, WOB:2-4KLBS 5X 5 SWEEPAHEAD -100' WIPER TRIPAND ROLLTF RIGHT. - CONTINUE TO DRILL AHEAD TO 10,437, 200' WIPER TRIP. - DRILL ON TO 10,529', STALL, STALLAGAIN AT 10,534' AND AT 10,547'. - PUMP 5 BELS LO / 5 BELS HI VIS SWEEP TO BIT. 16:30 - 17:30 1.00 DRILL P 10,547.00 PROD1 MAKE 700' WIPER TRIP CHASING SWEEP AHEAD OF BIT. - WIPER TRIP Q 25 FPM / 2.88 BPM IN / 2.88 BPM OUT/2675 PSI, 17:30 - 18:20 0.83 DRILL P 10,547.00 PROD1 DRILL 4.25" LATERAL FROM 10,550'MD TO 10,576' MD (8599' TVD) - FREE SPIN: 2,850 PSI ® 2.90 BPM - RATE: 2.95 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 2900-3350 PSI - MUD WEIGHT: 8.65 PPG IN, 8.71 PPG OUT, ECD: 9.92 PPG (9:8# AT WINDOW) - ROP: 40- 80 FT/HR Printed 12/42017 10:51:38AM *All depths reported in Drillers Depths" Common Well Name: R-28 Event Type: RE-ENTER- ONSHORE(RON) Project: Prudhoe Bay North America - ALASKA - BP Operation Summary Report Start Date. 11/6/2017 End Date 11/16/20'7 Site PB R Pad Spud Daterrime: 6/21/1992 12.00:OOAM Page 10 of 15 AFE No X3-018DM-C: (2,519,260 00 ) Rig Release. 11/19/2017 Rig Contractor: NABORSALASKA DRILLING INC. BPUOh USA00000324 Active datum: KB @51.20us8 (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) Wait) 18:20 - 19:30 1.17 DRILL N 10,547.00 PROD1 SEE ROP SLOW DOWN AFTER 10,550'. CONTINUE DRILLING AHEAD WITH FREQUENT PICKUPS, NO OVERPULLS SEEN. AT 10,576' PICK UP IS 15K OVER, CONTINUE PICKING UPHOLE AND DISCUSS WITH GEO. DECIDE TO PUMPA BOTTOMS UP BEFORE DRILLING ANY FURTHER TO LOOK FOR TRACES OF KINGAK. ABOUT 50' OFF BOTTOM WHILE PICKING UPHOLE INCORRECT MPD CHOKE ADJUSTMENT IS ENTERED, RESULTING IN HIGH WELLHEAD PRESSURE. START PULLING HEAVY, GET CHOKE OPENED BACK UP. STILL HAVE GOOD CIRCULATION AS BEFORE. TRY TO MOVE DOWN, CANT MOVE UP OR DOWN, CYCLE PIPE OK TO 75K. PUMP BOTTOMS UP FOR THE GEO, PUMP UP TRACTION PRESSURE TO ALLOW MORE PULLING FORCE THEN SHUT DOWN AND 'RELAX HOLE. SHUT OFF PUMPS, OPEN CHOKE. RELAX HOLE FOR 5 MIN. CYCLE PIPE 3 TIMES OK TO 90K, NO MOVEMENT. NO TENSION SEEN ON DWOB, ABLE TO ORIENT FREELY. NO TRACE OF KINGAK SEEN ON BOTTOMS UP OR ANY RETURNS FOR ABOUT AN HOUR AFTERWARDS. 19.30 - 2220 2 83 DRILL N 10,576.00 PROD1 PUMP 15 BBLS KCL SPACER, 19 BBLS LVT, 15 BBLS KCL BEHIND. PUMP 5 BBLS OUTAND SOAK FOR 12 MIN. CYCLE PIPE 2 TIMES OK TO 90K, NO MOVEMENT. PUMP 5 MORE BBLS LVT OUT, LET SOAK 20 MIN. CYCLE PIPE 2 TIMES OK TO 90K, NO MOVEMENT. PUMP 5 MORE BBLS LVT OUT, LET SOAK 30 MIN. CYCLE PIPE 3 TIMES OK TO 90K, NO MOVEMENT. PUMP REMAINING 4 BBLS LVT OUT, LET SOAK. CYCLE PIPE OK TO 90K, PIPE IS FREE. 22.20 - 00:00 1.67 DRILL P 10,578.00 PROD1 WIPER TRIP TO WINDOWAND TIE-IN. CIRCULATE LVT OUT OF HOLE, MAINTAIN 9.6 PPG AT THE WINDOW. 11/13/2017 00'.00 - 00:30 0.50 DRILL P 10,576.00 PROD1 PULL THROUGH WINDOWAND OPEN EDC. RUN DOWN AND JETACROSS WHIPSTOCK TRAY. PICK UPAND TIE-IN DEPTH, CORRECT +5 FT. GETTING SHALE PEBBLES BACKAFTER 1.SX ;BOTTOMS UP. Printed 12/4/2017 10:51:38AM *All depths reported in Drillers Depths' North America - ALASKA - BP Page 11 of 15 Operation Summary Report Common Well Name: R-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 11/6/2017 End Date 11/16/2017 X3-018DM-C'. (2,519,260.00 ) Project: Prudhoe Bay Site: PB R Pad Rig Name/No.: CDR -2 Spud Dale/Time: 6/21/1992 12:00:OOAM Rig Release: 11/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000324 Active datum: KB @51.20usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ _ (usft) _ 00:30 - 06:00 5.50 DRILL N 10,576.00 PROD1 HMI SCREEN IN OPS CAB IS DEAD. THIS SCREEN CONTROLS PUMP TRIPS, TUBING SPEED AND FORCE TRIPS AND USE OF THE AUTODRILLER. CONTINUE JETTING CASING WHILE ELECTRICIAN COMES OUTAND TROUBLESHOOTS. CONDUCT CCL LOG ACROSS LINER TOP SETTING AREA WHILE WAITING. 0600 - 13.00 7.00 DRILL N 10,576.00 PRODi NABORS ELECTRICIAN WORKING WITH SPECIALIST IN CANADA. - DOWNLOADING PROGRAMS ON TO HMI SCREEN PROCURED FROM CDR -3 RIG. - CONTINUE TO CIRCULATE FROM WINDOW AREA @2 BPM IN/2 BPM OUT/1700 PSI, ,EDC OPEN. - CLEAN AND MAINTAIN EQUIPMENTAROUND THE RIG. 13:00 - 14:45 175 DRILL N 10,576.00 PROD1 PROGRAMS INSTALLED ON HMI SCREEN / COMPUTER. - ELECTRICIAN INSTALLING SCREEN / _ COMPUTER BACK ON STATION. 1445 - 15:30 0.75 DRILL P 10.576.00 PROD1 RUN IN THE HOLE WITH 4-1/4" DRILLING ASSEMBLY FROM 9150' MD (100' ABOVE WINDOW) TO PREVIOUSLY DRILLED DEPTH OF 10578' MD (COMPLETE WIPER TRIP) - CLOSE EDC PRIOR TO TRIPPING - 2.2 BPM IN, 2.35 BPM OUT, 2135-2200 PSI CIRC PRESSURE - SLACKOFF WEIGHT = 25 KLBS AT 25 FPM - MAINTAIN 9SPPG AT WINDOW WITH 150 PSI WH PRESSURE 1590 - 21.00 5.50 DRILL P 10,830.00 PROD1 DRILL4-1/4" LATERAL FROM 10,576'MD TO 10,830' MD IN SAG RIVER SAND - FREE SPIN: 2750-2800 PSI @ 2.85 BPM - RATE: 2.88 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 2900 - 3050 PSI - MW: 8.67 PPG IN, 8.69 PPG OUT, ECD: 10.05 PPG, 125 PSI WH PRESSURE TO MAINTAIN 9.8PPG ECD AT WINDOW - ROP: 50-100 FPH FT/HR, WOB: 2— 4KLBS - AT 10,670' ADD 0.25% NXS LUBE TO BRING TOTAL LUBE CONCENTRATION TO 2.75% - AT 10,690' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. -AT 10,720' PULL SHORT WIPER BACK TO 10,_200'. CLEAN PASS UPAND DOWN. 21:00 - 23:30 2.50 DRILL P 10,976.00 PROD1 DRILL 4-1/4" LATERAL FROM 10,830' MD TO 10,978' MD IN SAG RIVER SAND - FREE SPIN: 2750-2800 PSI @ 2.93 BPM - RATE: 2.92 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 3,000 - 3,150 PSI - MW: 8.67 PPG IN, 8.70 PPG OUT, ECD: 10.11 PPG, 120 PSI WH PRESSURE TO MAINTAIN 9.8PPG ECD AT WINDOW - ROP: 50-150 FPH FT/HR, WOB: 2— 3KLBS - AT 10,840' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. - AT 10,869' PULL 500' WIPER TRIP, CLEAN PASS UP AND DOWN. - AT 10,970' PUMP 10 BBLS LO / HI VIS SWEEP AROUND, PREP FOR LONG WIPER. Panted 12/42017 10:51:38AM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 12 of 15 1 Common Well Name: R-28 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 11/6/2017 End Date. 11/16/2017 X3-018DM-C:(2,519,260.00) Project: Prudhoe Bay Site: PB R Pad __PRESSURE: 2,800 PSI _ Rig Name/Nc.: CDR -2 Spud Date/Time: 6/21/1992 12:00 OOAM Rig Release: 11/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000324 Active datum: KB @51.20usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usR) 2330 - 0000 0.50 DRILL P 10,976.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW 11,412' MD IN SAG RIVER SAND '- FREE SPIN: 2,825 PSI @ 2.89 BPM - RATE: 2.85 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 2,950 - 3,150 PSI - MW: 8.67 PPG IN, 8.70 PPG OUT, ECD: 10.07 PPG, 90 PSI WH PRESSURE TO MAINTAIN 9.8PPG ECD AT WINDOW - ROP: 50 - 100 FT/HR, WOB: 2 - 3KLBS Printed 12/412017 10:51:38AM *All depths reported in Drillers Depths' FROM 10,976'. - RATE: 2.92 BPM tN 2.73 BPM OUT. CIRC __PRESSURE: 2,800 PSI _ 11/14/2017 '00:00 - 02:30 2.50 DRILL P 10,976.00 PROD? CONTINUE LONG WIPER TRIP TO WINDOW - PULL THROUGH WINDOW AND OPEN EDC. RUN BACK IN AND JET WHIPSTOCK TRAY. - PUMP 1.5X BOTTOMS UP WHILE TIE IN DEPTH. - CORRECT+2 FT. - CLOSE EDC AND RUN BACK TO BOTTOM, NOTHING SEEN AT WINDOW. - KEEP AS DRILLED TF AND REDUCED PUMP _ RATE, CLEAN_ PASS TO BOTTOM. _ 02:30 - 05:15 2.75 DRILL P 11,137.00 PROD? DRILL 4-1/4" LATERAL FROM 10,977'MD TO 11,137' MD IN SAG RIVER SAND - FREE SPIN: 2,800 PSI @ 2.89 BPM - RATE: 2.89 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 3,000-3,150 PSI - MW: 8.67 PPG IN, 8.70 PPG OUT, ECD: 10.07 PPG, 90 PSI WH PRESSURE TO MAINTAIN 9.8PPG ECD AT WINDOW -ROP: SO FT/HR, Woe 2- 3KLBS 0515 - 0545 0.50 DRILL ? P 11,137.00 PROD1 WITH 5 BBLS LO / 5 BBLS HI VIS SWEEP OUT AT BIT, PERFORM WIPER TRIP. -TRIP @40 FPM/2.85 BPM IN/2.57 BPM OUT 12800 PSI. - PULL TO 10,640', CLEAN, RBIH Q 32 FPM, 24K DOWN WE CLEAN UP AND DOWN. 05'.45 - 09:00 3.25 DRILL P 11,270.00 PROD? DRILL 4-1/4" LATERAL FROM 11,137'MD TO 11,270' MD IN SAG RIVER SAND 8591' TVD - FREE SPIN: 2,825 PSI @ 2.89 BPM - RATE: 2.89 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 3,000-3,150 PSI - MW: 8.67 PPG IN, 8.70 PPG OUT, ECD: 10.07 PPG, 90 PSI WH PRESSURE TO MAINTAIN 9aPPG ECDAT WINDOW - ROP: 50 - 100 FT/HR, WOE: 2 - 3KLBS 09:00 - 09:30 0.50 DRILL P 11,270 00 PROD1 WITH 5 BBLS LO/ 5 BBLS HI VIS SWEEP OUT AT THE BIT, PERFORM A WIPER TRIP. - WIPER TRIP TO 10,760', NO ISSUES. WELL WORD INDICATES.41 BBLS OF CUTTINGS _ BACK ON WIPER. 09:30 - 12:30 3.00 DRILL P 11412.00 PROD? DRILL 4-1/4" LATERAL FROM 11,270'MDTO 11,412' MD IN SAG RIVER SAND '- FREE SPIN: 2,825 PSI @ 2.89 BPM - RATE: 2.85 BPM IN, 2.85 BPM OUT. CIRC PRESSURE: 2,950 - 3,150 PSI - MW: 8.67 PPG IN, 8.70 PPG OUT, ECD: 10.07 PPG, 90 PSI WH PRESSURE TO MAINTAIN 9.8PPG ECD AT WINDOW - ROP: 50 - 100 FT/HR, WOB: 2 - 3KLBS Printed 12/412017 10:51:38AM *All depths reported in Drillers Depths' North America - ALASKA - BP Page 13 of 15 Operation Summary Report Common Well Name: R-28 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 11/6/2017 End Date: 11/16/2017 X3-018DM-C: (2,519,260.00 ) Project: Prudhoe Bay Site: PB R Pad Rig Name/No.: CDR -2 Spud Date/rime: 6/21/1992 12.00:OOAM Rig Release: 11/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000324 Active datum: KB @51.20usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ - (usft) ____ 1230 - 17'00 4.50 DRILL P 11,412.00 PROD? PERFORM LONG WIPER TRIP TO WINDOW 17:00 - 21:30 4.50 2130 - 00'.00 2 50 11/15/2017 00.00 - 0145 1.75 FROM 11412' MD (436' FROM LAST LONG WIPER TRIP) - 100 PSI HELD ON WELLHEAD TO MAINTAIN 9.8 PPG AT WINDOW - PUMP 10 BBLS LO / 10 BBLS HI VIS SWEEPSOUT OF BIT PRIOR TO TRIP DEPTH AND CHASE OUT OF THE HOLE DURING WIPER (NO SIGNIFICANT INCREASE AT SHAKERS) - 25 FPM, RATE: 2.88 BPM IN / 2.71 BPM OUT, CIRC PRESSURE: 2850 PSI WHILE PULLING IN OPENHOLE -PULL THROUGH WINDOW WITH NO ISSUES AT 0.5 BPM - JOG AND OPEN EDC (NEW PRESSURE 2375 PSI AT 2.91 BPM, 3500 PSI AT 4 BPM) - PUMP 5 BELS LO 15 BBLS HI VIS SWEEP AND SEE DIME SIZE CUTTINGS RETURNED AT THE SHAKERS (PLUGGING OFF MM OUT) -- JET WHIPSTOCK TRAY AND UP TO TUBING TAILAT8925MD '- TIE IN TO GR LOG AT 9000'MD WITH+2' CORRECTION - CLOSE EDC AND RUN IN HOLE TO PREVIOUSLY DRILLED DEPTH OF 11412' MD DRILL P 11,620.00 PROD1 DRILL 4-1/4" LATERAL FROM 11,412'MD TO 11,620'MD IN SAG RIVER SAND - FREE SPIN: 3,000 PSI @ 2.90 BPM - RATE: 2.91 BPM IN, 2.83 BPM OUT. CIRC PRESSURE: 3,000 - 3,500 PSI - MW: 8.74 PPG IN, 8.80 PPG OUT, ECD: 10.1 PPG, 100 PSI WH PRESSURE TO MAINTAIN 9.8PPG ECD AT WINDOW - ROP: 40 - 60 FT/HR, WOB: 1-3 KLBS - AT 11,470' PUMP 5 BELS LO / HI VIS SWEEPS AROUND. -AT 11,580' PULL SHORT WIPER BACK TO 11,100'. DRILL P 11,750.00 PROD1 DRILL 4-1/4" LATERAL FROM 11,620'MD TO 11,750' MD IN SAG RIVER SAND - FREE SPIN: 3,050 PSI @ 2.91 BPM - RATE: 2.91 BPM IN, 2.88 BPM OUT. CIRC PRESSURE: 3,000-3,500 PSI - MW: 8.77 PPG IN, 8.84 PPG OUT, ECD: 10.29 PPG, 110 PSI WH PRESSURE TO MAINTAIN 9.8PPG ECD AT WINDOW - ROP: 40- 100 FT/HR, WOB: 1-3 KLBS - USE 290 BBLS NEW MUD FOR DUMP AND DILUTE. _ DRILL P 11,833.00 PROD? DRILL 4-1/4" LATERAL FROM 11,750'MD TO 11,833' MD IN SAG RIVER SAND - FREE SPIN: 2,700 PSI @ 2.93 BPM - RATE: 2.93 BPM IN, 2.68 BPM OUT. CIRC PRESSURE: 2,750 - 3,150 PSI - MW: 8.67 PPG IN, 8.76 PPG OUT, ECD: 10.11 PPG, 120 PSI WH PRESSURE TO MAINTAIN 9.8PPG ECDAT WINDOW - ROP'. 80 - 100 FT/HR, WOB: 2 - 3KLBS Printed 12/412017 10:51:38AM *All depths reported in Drillers Depths' North America -ALASKA - BP Operation Summary Report Page 14 of 15 FROM 17,833' MD (421' FROM PREVIOUS LONG WIPER) - RATE: 2.84 BPM IN, 2.68 BPM OUT. CIRC PRESSURE: 2,730 PSI -PUMP 10 BBLS LO / Al VIS SWEEPS AHEAD OF WIPER. -PULL THROUGH WINDOW AND PERFORM JOG, THEN OPEN EDC. -JET WHIPSTOCK TRAY THEN PICKUP FOR 71E -IN, PUMP 1.SX B/U -TIE-IN DEPTH, CORRECT+1 FT. -RUN BACK TO BOTTOM _ PRODt DRILL 4-1/4" LATERAL FROM 11,833'MD TO 12,071' MD IN SAG RIVER SAND -FREE SPIN: 2,700 PSI @ 2.93 BPM - RATE: 2.93 BPM IN, 2.88 BPM OUT. CIRC PRESSURE: 2,750 - 3,150 PSI - MW. 8.67 PPG IN, 8.76 PPG OUT, ECD: 10.11 PPG, 120 PSI WH PRESSURE TO MAINTAIN 'I '9.8 Common Well Name: R-28 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date: 11/6/2017 End Date: 11/16/2017 X3-018DM-C'. (2,519,260.00) Project: Prudhoe Bay Site: PB R Pad Rig Name/No.: CDR -2 Spud Daterrime: 6/21/1982 12:00:OOAM Rig Release: 11/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000324 Active datum: KB @51.20us8 (above Mean Sea Level) Date From - To We Task Code NPT Total Depth Phase Description of Operations (hr) _ (usm _ _ 0145 - 0530 3.75 DRILL P 11,833.00 PRODt PERFORM LONG WIPER TRIP TO WINDOW 0530 - 0945 4.25 DRILL P 09.45 - 11'.30 1.75 DRILL P N:30 - 1T.00 5.50 DRILL P Printed 12/4R017 10:51:38AM *All depths reported in Dri PPG ECD AT WINDOW -ROP: 80-100 FT/HR, WO8:2-3KLBS - GEO TEAM HAS INFORMATION THEY NEED PAST FAULT ZONE, CALL TD AT 12011' MD 12,011.00 PROD? CONDUCT WIPER FROM TD CHASING A LO -VIS / HI -VIS SWEEP COMBO. PICKUP CLEAN, PUW CONSISTENT TO WINDOW AT 48 -SOK. ' -HIGH RATIO OF CUTTINGS RETURNS AS BHA CAME UP TO WINDOW, -30% INCREASE FROM NORMAL RETURNS EARLIER -TURN AROUND AND MOVE BACK TO BOTTOM WITH CONSISTENT 24K SOW � -MAINTAIN 2.80 BPM FLOW RATE ON TRIP UP AND DOWN. LOWER PUMP RATE TO 1.50 BPM ON TRIP UP THROUGH SHALE AND LOWER TO .S BPM ON TRIP DOWN. 12,011.00 PRODi TAG UP ON BOTTOM AND TIME TURN AROUND WITH ANOTHER LO -VIS / HI -VIS SWEEP -CHASE SWEEP OUT AND UP HOLE AT 2.90 BPM. PUW CONSISTENT AT 48-49K. -LOWER RATE THROUGH SHALE SECTION TO 1.50 BPM -CHASE UP TO WINDOW, OPEN EDC WITH LO -VIS SWEEP COMING OUTAND JET ACROSS WHIPSTOCK TRAY -CIRCULATE THROUGH 5-1/2" TUBING AT 4.4 BPM, 3980 PSI, PULLING SLOWLY. BOTTOMS UP HAS DIME TO NICKEL SIZE SHALE COMING ACROSS SHAKER. TURNAROUND AND RUN DOWN AT 700 FPM WHILE CIRCULATINGAT 4.15 BPM 70 FLUSH 5-1/2" AGAIN. SHAKER HAS CLEANED UP, ONLY FINE CUTTINGS ACROSS NOW -PICK UP THROUGH 5-112" AT 20 FPM, 4.45 SPM, 4000 PSI -NOTICEABLE REDUCTION IN RETURNS AND NO SHALE DURING THIS CIRCULATION. CONTINUE TO POH TO SURFACE. 12,011.00 llers Depths' Common Well Name'. R-28 Event Type. RE-ENTER- ONSHORE(RON) Rig Name/No.: Active datum: KB @51.20usft (abo Date From - To 1700 - 1840 18:40 - 19:30 1930 - 20:00 20.00 - 2020 North America - ALASKA- BP Operation Summary Report Start Date: 11/6/2017 End Date: 11/16/2017 Site: PB R Pad Spud Date7rime: 6/21/1992 12:00:OOAM Mean Sea Level) Page 15 of 15 AFE No K3-018DM-C: (2,519,260.00 ) Rig Release: 11/19/2017 BPUOI: USA00000324 Him Task Code NPT Total Depth Phase Description of Operations (hr) Waft) - RATE: 1.0 BPM IN, 1.23 BPM OUT, CIRC 1.67 DRILL P 12,011.00 PROD1 CONTINUE POOH TO SURFACE. PERFORM 500' JOG AT SURFACE, DOES NOT BRING BACK ANY ADDITIONAL CUTTINGS. JUST FINE CUTTINGS COMING ACROSS SHAKERS NOW. _ 0.83 DRILL P 12,011.00 PROD? 10 MIN PUMPS OFF FLOW CHECK IS STATIC. REVIEW PROCEDURE FOR CHANGING BHA. 'OPEN RISER AND INSPECT LAST 50.OF CT, 11/16/2017 00:00 - 01:00 1.00 CONDHL P 12,010.00 NOTHING SEEN. INJECTOR OFF 19:25. 01:00 - 06:30 5.50 CONDHL P 12,010.00 BHA. 0.50 BOPSUR P 12,011.00 PRODt _S_TA_ND_BAC_K FUNCTION TEST BOPS. 0.33 BOPSUR P 12,011.00 PROD1 'MAKE UP 4.25' DRILLING BHA#6, SAME AS LAST BHA - PICK UP 2-7/8" ILLS MOTOR (1.2 DEG AKO) AND 3" COILTRAK TOOLS - USE SAME HCC BIT WITH P104 CUTTERS. - SURFACE TESTED COILTRACK TOOL. GOOD TEST. - PRESSURE TEST OTS 703,500 PSI HIGH ,FOR 5 MINUTES -- INJECTOR ON: 20:00 20:20 - 00:00 3.67 BOPSUR P 12,011.00 PROD1 RIH WITH 4.25" DRILLING BHA#6 - RATE: 1.0 BPM IN, 1.23 BPM OUT, CIRC PRESSURE: 1,370 PSI - MUD WEIGHT: 8.67 PPG IN, 8.68 PPG OUT - USE MPD CHOKE TO KEEP 9.8 PPG AT THE WINDOW. - LOG DOWN FOR TIE-IN FROM 9,900' WITH +18'CORRECTION - PASS THROUGH WINDOW WITH NO ISSUES, CLEAN PASS TO BOTTOM.. 11/16/2017 00:00 - 01:00 1.00 CONDHL P 12,010.00 PROW CONTINUE RIF TO BOTTOM. TAG AT 12,010' CORRECTED DRILLED TD. 01:00 - 06:30 5.50 CONDHL P 12,010.00 PROD1 POOH LAY IN BEAD PILL FROM TO TO WINDOW. PULLTHROUGH WINDOW AND PERFORM 50' JOGABOVE WINDOW, THEN OPEN EDC. RUN INAND JET WHIPSTOCKTRAY WITH OPEN EDC. PULLABOVE WINDOW AND PUMP EP LUBE PILLAROUND FOLLOWED BY 9.8# MUD. CONDUCT 3 PICKUPS AT LINER TOP DEPTH AT 30 FT/MIN, ZERO PUMP RATE. TRAVEL DISTANCE EACH TIME IS 3.1, 3.1, AND 3.4 FT WEIGHT EACH TIME IS FROM 30K TO BREAKOVER OF 51K. CONTINUE POOH. FLAG PIPE ON THE WAY OUT 8,600' AND 5,800' EDP. - FLOW CHECKAT SURFACE, POP OFF WITH INJECTOR 06:30 - 07:30 1.00 CONDHL P 12,010.00 PROD1 INSPECT PIPE AS REEL IS PULLED BACK COIL IN GOOD CONDITION, NO WEAR SPOTS FROM 200' - BREAK OFF BHA, BLOW DOWN AND LAY DOWN Printed 12/4/2017 10:51:38AM *All depths reported in Drillers Depths' Printed 12/412017 10:52:05AM 'All depths reported in Drillers Depths' North America - ALASKA - Ble Page 1 or 5 Operation Summary Report Common Well Name. R-28 AFE No Event Type 'COM- ONSHORE (CON) Start Date: 11/16/2017 End Date. 11119/2017 X3-016DM-C:(1,168,034.00) Project: Prudhoe Bay Site: PB R Pad Rig Name/No.: CDR -2 Spud Date/Time: 6/21/1992 12:00:00AM Rig Release: 11/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOL USA00000324 Active datum: KB Q51.20usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 11/16/2017 07:30 - 12:30 5.00 CASING P 12,010.00 RUNCMP CUT OFF COIL CONNECTOR AND 50'OF COIL / E -LINE FOR CHROME MANAGEMENT - INSTALL NEW CONNECTOR, PULLAND PRESSURE TEST PER LEAK TIGHT 'REQUIREMENTS. GOOD TEST. - PUMP SLACK FORWARD, CUT 190' OF E -LINE -RE -BOOT E -LINE _ 1290 - 14.30 2.00 CASING P 12,010.00 RUNCMP INSTALL STINGER AND NOZZLE, STAB ON ,AND PUMP 3/4" DRIFT BALLAROUND - POP OFF, RETRIEVE BALL '- INSPECT PIPE IN PIPE SHED, VERIFY RUNNING ORDER AND LIFT COMPONENTS 14:30 - 18:30 4.00 CASING P 12,010.00 RUNCMP PJSM ON MU COMPLETION ASSEMBLY - DISCUSS WELL CONTROL CONTINGENCIES '- WSL, BTT REPAND DRILLER CONFIRM PIPE COUNT - BEGIN MAKING UP 2-7/8" X 3-1/4" X 3-1/2" 13CR-85 LINER ASSEMBLY PER RUNNING ORDER FILL PIPE EVERY 10 JTS. 1830 - 19.00 0.50 CASING P 12,010.00 RUNCMP .AFTER JT#70 CONDUCT of DRILL. CREW PICKS UP SAFETY JOINT AND XO, . MAKES IT UPAND TORQUES IT. DRILLER RUNS IN TO CORRECT SPACEOUT, SIMULATES SHUT IN. CREW GOES TO ASSIGNED POSITIONS. WELL IS SECURED IN 3 MIN. CONDUCTAAR. 19:00 - 23:30 4.50 CASING P 12,010.00 RUNCMP CONTINUE MAKING UP LINER. MAKE UP 6 JTS OF PHIS AND SWIVEL, MAKE UP INJECTOR. PRESSURE TEST QTS TO 3,500 PSI, GOOD. 23:30 - 00:00 0.50 CASING P 12,010.00 RUNCMP RIH WITH LINER. 11/17/2017 0000 - 01:00 1.00 CASING P 12,010.00 RUNCMP CONTINUE RIH WITH LINER. 01.00 - 04:00 3.00 CASING P 12,010.00 RUNCMP STOP AT FIRST FLAG, CORRECT+12 FT. CONSISTENT WITH EARLIER DRILLING CORRECTIONS. UP WEIGHT AT WINDOW IS 54K WITH 3.4 FT OF TRAVEL. CLEAN PASS DOWN TO 11,702', STACKING WEIGHT. PICKUP IS 56K. START WORKING LINER TO BOTTOM. WORK LINER TO 11,852' STACKING REPEATEDLY HERE. Printed 12/412017 10:52:05AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: R-28 AFE No Event Type: COM- ONSHORE (CON) Start Date: 11/16/2017 End Date: 11/19/2017 X3-018DM-C: (1,168,034.00) Project: Prudhoe Bay Site: PB R Pad Page 2 of 5 Rig Name/No.: CDR -2 Spud Date/Time: 6/21/1992 12:00 OOAM Rig Release: 11/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000324 Active datum: KB @51.20usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations -- — _ (hr) _ (usft) __— 04:00 - 0900 5.00 CASING P 12,010.00 RUNCMP PUMP SPACERS AND 20 BBLS LVi DOWN - WORK PIPE DOWN WITH LVT OUT OF PIPE. PICKUPS FAIRLY CLEAN, RANGING BETWEEN 64-79K PICKUPS. - TD FLAG DEPTH RIGHT ON DEPTH. CONTINUE TO WORK DOWN, ABLE TO GET TO 12,004' BUT THEN LOST TIN FURTHER ATTEMPTS TO WORK. - NO FURTHER PIPE MOVEMENT FROM 12,001' WITH PUMP RATE UP TO 1.2 BPM AND 15K SET DOWN WEIGHT. CONTINUE TO USE 15K SET DOWN WEIGHT AND PUMPING AT 7 BPM IN PREPARATION TO PUMP 5/8" BALL DOWN TO RELEASE. - NO MOVEMENT OF PIPE DURING CIRCULATION 0900 - 10:15 1.25 CASING P 12,010.00 RUNCMP NEW CREW ON LOCATION, CONDUCT PJSM FOR DROPPING BALL - PLACE REEL IN FAVORABLE LAUNCH POSITION, LAUNCH BALL - BALL LANDED AT 48 BBLS AWAY, SHEAR AT 4700 PSI - CONDUCT TWO PICKUPS WITH INDICATION OF BREAKOVER AT -50K AT LESS THAN 12' OF TRAVEL 10:15 - 13:00 2.75 CEMT N 12,010.00 RUNCMP ATTEMPT TO TRANSFER KCL FROM TANK FARM TO RIG, PUMP IS LEAKING AT PACKING WHEN ENGAGED. ATTEMPT TO TIGHTEN, STILL LEAKING WHEN ENGAGED. -TRANSFER FLUID VIATRUCK ON LOCATION - CIRCULATE AROUND 8.7 PPG MUD SYSTEM AT 1.20 BPM, 1500 PSI WHILE CONDUCTING F _ _ TRANSFER 13:00 - 15:00 2.00 CEMT P 12,010.00 RUNCMP KCL HAS BEEN TRANSFERRED TO RIG PIT SYSTEM. DISPLACE TO 8.45 PPG KCLAT 2.50 BPM, 2000 PSI. - CEMENTERS ARE RIGGED UP, PREPARED FOR OPERATIONS -CLEAN KCLALLTHE WAYAROUND. CIRC PRESSURE OF 320 PSI AT 1.0 BPM. - CONDUCT PRESSURE CROSSCHECK DISCUSSION. PRESSURE TEST LINES UP TO INNER REELVALVE TO 4700 PSI. GOOD TEST. Printed 12/4/2017 10:52:05AM 'All depths reported in Drillers Depths' Common Well Name: R-28 Event Type: COM- ONSHORE (CON) Prudhoe North America - ALASKA- BP Operation Summary Report Start Date: 11/16/2017 End Date'. 11/19/2017 Site: PB R Pad AFE No X3-018DM-C: (1,168,034.00 ) ( Rig Name/No.: CDR -2 Spud Date/time: 6/21/1992 12:00 OOAM Rig Release: 11/19/2017 Active datum: KB @51.20usft (above Mean Sea Level) Date From- To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 1500 - 1730 2.50.5b CEMT P 12,010.00 RUNCMP PJSM ON CEMENT JOB. 17:30 - 20:40 3.17 CEMT P 12,010.00 20:40 - 22:30 1.83 CEMT P 12,010.00 22:30 - 00:00 1.50 CEMT P 12,010.00 11118/2017 00:00 - 06:00 6.00 PERFOB P 12,010.00 Page 3 of 5 Printed 12/4/2017 10:52.05AM *All depths reported in Drillers Depths" - MIX AND PUMP 43 BELS OF CEMENT, CEMENT WETAT 1550 HRS - LOAD 38.2 BELS 15.3 PPG CEMENT IN REEL, SWAP TO RIG PUMP, CLEANUP LINES TO SLB UNIT - DISPLACE CEMENT WITH 8.45 PPG EXHAUST PILL AT AVERAGE OF 2.50-3.0 BPM, 1615-2840 PSI - SHUT DOWN PUMPS, PICK UPAND SET DOWN 10'HIGHER. ROLLPUMPSAND LAUNCH PEE WEE DART, PICK UP AND SIDE EXHAUST 5 BELS. SET BACK DOWN AND PRESSURE UP TO 2000 PSI, LAUNCH LINER WIPER PLUG DOWN AND ZERO IN MM. - LINER WIPER PLUG SHEAREDAT 3300 PSI, .3 BBLS - DISPLACE LINER WIPER PLUG AT AVERAGE OF 2.25-2.4 BPM, 1900-2250 PSI, FINAL RATE OF 2.35 BPM, 2680 PSI - PLUG BUMPEDAT 20.5 BELS, 3600 PSI (20.5 BBLS CALCULATED) - OPEN BAKER CHOKE AND CHECK FLOATS. GOOD TEST. - CLOSE BAKER CHOKE, PRESSURE UP TO 1000 PSI ON COIL, PICK UP AND CONFIRM PRESSURE DROP -CEMENT IN PLACE: 1725 HRS - 34.7 BBLS CEMENT BEHIND PIPE, BASED ON ORION AND WELLWORC MICROMOTION READINGS - NO LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE RUNCMP PICK UP FROM DEPLOYMENT SLEEVE AND CLEAN ABOVE LINER TOP. - DYNAMIC FLOW CHECK HERE FOR 10 MIN, STATIC - CONTINUE TO PICK UP WHILE CIRCULATING AT 3.0 BPM, 2270 PSI, WITH 8.41 PPG IN, 8.43 PPG OUT - FLAG_ PIPE AT 6,921 FT EDP WHILE POOH. RUNCMP FLOW CHECKAT SURFACE IS STATIC. PJSMAND REVIEW PROCEDURE FOR LAYING DOWN PH6. LAY DOWN 6 JTS OF PH6 AND LINER RUNNING TOOL. RECOVER 5/8" BALL. INJECTOR OFF AT 21:00. TOOL HAS FUNCTIONED NORMALLY. RUNCMP CUT OFF BOT EXTERNAL CONNECTOR, INSTALL INTERNAL DIMPLE CONNECTOR. PULL TEST TO 40K, PRESSURE TEST TO 3,500 PSI, GOOD. OTHCMP PJSM AND REVIEW PROCEDURE AND RISKS FOR MAKING UP PERF GUNS. MAKE UP PERF BHAAS PER PERF MEMO. TOTAL OF 79 2" MAXFORCE PERF GUNS WITH 6 SPF / 60° PHASING - STAB ON WITH INJECTOR, PRESSURE TEST QUICK TEST SUB Printed 12/4/2017 10:52.05AM *All depths reported in Drillers Depths" Printed 12/412017 10:52:05AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 4 of 5 Operation Summary Report Common Well Name: R-28 AFE No Event Type: COM- ONSHORE(CON) Start Date. 11/76/2017 End Date 11/19/2017 X3-018DM-C:(1,168.034.00) Project: Prudhoe Bay Site: PB R Pad Rig Name/No.: CDR-2 Spud Daterl-ime: 6/21/1992 12:OO.00AM Rig Release: 11/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000324 _ Active datum: KB @51.20usR (above Mean Sea Level) Date From -To Him Task Code NPT Total Depth Phase Description of Operations (hr) _,. _ Wall). 0600 - 0945 3.75 PERFOB P 12,070.00 OTHCMP RIH WITH PERFORATION BHA - FLAG OFF DEPTH BY 10', CORRECTION IS TYPICAL OF CORRECTIONS DURING DRILLING I - TAG ON DEPTH AT PBTD OF 11,987' WITH 4K DOWN - CONDUCT LINER LAP TEST TO 2400 PSI FOR 130 MINUTES, GOOD TEST -CONDUCT PJSM WITH PERFORATORS 'WHILE CONDUCTING LINER LAP TEST _ 09:45 - 10:15 0.50 PERFOB P 12,010.00 OTHCMPCONDUCT FIRING SEQUENCE PER HALLIBURTON REP - PLACE ON DEPTH AT PBTD OF 11985', POSITIVE INDICATION OF FIRING '- IMMEDIATELY PICK STRING UPAND PREPARE FOR POH _ 1015 - 1315 3.00 PERFOB P 12,010.00 OTHCMP POH HOLDING -200 PSI BACK PRESSURE - INITIAL LOSS OF 4 BBLS - POH WITH -6-8 BPH LOSS RATE - FLOW CHECKAT LINER TOP, WELL ON LOSSES -CONTINUE TO POH TO SURFACE. FLOW CHECK 200' BELOW SURFACE, ALL GOOD. - POP OFF WITH INJECTOR 1315 - 19.00 5.75 PERFOB P 12,010.00 OTHCMP LAY DOWN UPPER PORTION OF WORK STRING WITHOUT ISSUES - NO ISSUES LAYING DOWN BHA, ALL SHOTS FIRED - WELL IS TAKING -1-2 BPH WHILE STATIC AT SURFACE - SUBMIT TEST REQUEST TO AOGCC FOR BOP TEST ON MONDAY, NOV 20, AT 060.0 HRS 1900 - 2030 1.50 PERFOB P 12,010.00 OTHCMP FINISHED LID PERF GUNS, ALL SHOTS FIRED. PERFORATED INTERVALS: 10,320' - 10,420- 10,570'- 11,630- 1,630'11,830'-71,985'CLEAN 11,830- - AND CLEAR RIG FLOOR. OFFLOAD PERF RUNNING EQUIPMENT. 2030 - 21:00 0.50 WHSUR P 12010.00 POST MAKE UP FREEZE PROTECT BHA. MAKE UP INJECTOR TO WELL. TEST QTS TO 3,500 PSI, GOOD. 21:00 - 23:30 2.50 WHSUR P 12,010.00 POST RIH PJSM WITH LRS CREW, REVIEW PROCEDURE FOR PUMPING DIESEL FREEZE PROTECT. WSLAND LRS SUPERVISOR REVIEW PRESSURE CROSSCHECKAND VERIFY LOW PRESSURE PUMP TRIPS. PT LRS LINES THEN PUMP 50 BBLS DIESEL, FOLLOW WITH 5 BBLS MEOH. LAY IN DIESEL FREEZE PROTECT FROM _2,500' TO SURFACE. 23:30 - 00:00 0.50 WHSUR P 12,010.00 POST VALVE CREW GREASES TREE THEN T-BAR IN TWC. CLOSE MASTER VALVE. _ 11/19/2017 00:00 - 02:00 2.00 RIGD P 12,010.00 POST PUMP SLACK BACK THEN DISPLACE REEL TO FRESH WATER. RIG UP HYDRAULIC CUTTER, CUT OFF 277' OF CT (1.81% SLACK). CABLE ISN'T SEEN. Printed 12/412017 10:52:05AM 'All depths reported in Drillers Depths' North America - ALASKA - SP Page 5 of 5 Operation Summary Report Common Well Name: R-28 AFE No Event Type: COM- ONSHORE(CON) Start Date: 11/16/2017 End Date: 11/19/2017 X3-018DWC:(1,166,034.00) Project: Prudhoe Bay Site: PB R Pad Phase Rig Name/No.: CDR -2 Spud Daterrime: 6/21/1992 12:00:OOAM Rig Release: 11/19/2017 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000324 Active datum: KB Q51.20usft (above Mean Sea Level) (usft) Date From - To Him Task Code NPT Total Depth Phase Descdp8on of Operations (hr) _ (usft) 0200 - 03:00 1.00 RIGD P 12,010.00 POST INSTALL CT CONNECTOR. PULL TEST TO 45K, GOOD. 0300 - 0430 1.50 RIGID P 12,010.00 POST INSTALL BHI CABLE HEAD. PRESSURE TEST BHI CABLE HEAD AND CT CONNECTOR TO 4,700 PSI, GOOD. 0430 - 0630 2.00 RIGID P 12,010.00 POST MAKE UP NOZZLE, JET STACKAND PUMP SLACK FORWARD AT THE SAME TIME. _-BLOW DOWN REEL 0630 - 13:30 7.00 RIGID P 12,010.00 POST RIG TEAM CONDUCTING RIG DOWN OPERATIONS IN PREPARATION FOR MOVE - RIG FLOOR PREPARATIONS FOLLOW RIG MOVE PROCEDURE CHECKLIST - CONDUCT LEAK TIGHT TEST, ND BOP AND SECURE - FILL TREE WITH METHANOL, INSTALL TREE CAP AND CONDUCT LEAK TIGHT TEST -RIG RELEASE AT 1330 HRS. SEE RON REPORT FOR H-37 FOR FURTHER _ACTIVITIES. Printed 12/4/2017 10:52:05AM 'All depths reported in Drillers Depths' by North America - ALASKA - BP Prudhoe Bay PB R Pad R-28 R -28A 500292227301 Design: R -28A Final Survey Report 21 November, 2017 BAIGIHES T 1 aGEcompany BP (ER BA�UG by Final Survey Report GE,.mp y Company: North Amenca- ALASKA -BP Local Coordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R-28A Survey Calculation Method: Minimum Curvature Design: R-28A Database: EDM RSK- Alaska PROD -ANCP1 Project Prudhoe Bay, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK [4267'15864) Using Well Reference Point Map Zone: NAD27'OGP-Usa AK/Alaskamne4[26734`1586 Using geodetic scale factor Site PB R Pad, TR-12-13 Site Position: Northing: 5,975,706.220 usft Latitude: 70' 20'29.100 N From: Map Easting: 637,446.420 usft Longitude: 148° 53'4.328 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.05 ° Well R-28, R-28 Well Position +N/-S 0.00 usft Northing: 5,877,049.160 usft Latitude: 70° 20'42.655 N +EI-W 0.00 usft Easting: 634,371.180 usft Longitude: 148° 54'33.451 W Position Uncertainty 0.00 usft Wellhead Elevation: 19.84 usft Ground Level: 18.74 usft Wellbore R-28A Magnetics Madel Name Sample Date Declination Dip Angle Field Strength BGGM2017 11/1/2017 17.60 80.99 57,494 Design R-28A Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,20000 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft] (usft) (I 3136 0.00 0.00 295.00 11212017 1:49:30PM Page,e COMPASS 5000 1 Build 81D bp Final SurveBP y Report �F�UGHES GEmm,, Company: North Amence - ALASKA - BP Local Co-ordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R -28A Survey Calculation Method Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCP1 Survey Program Date 11/2112017 (usft) From To 31.36 0.00 (usft) lush) Survey (Wellbore) Tool Name Description -19.84 100.00 9,200.00 1 Schlumberger GCT multishot (R-28) GCT -MS Schlumberger GCT multishot 5,977,049.160 9,249.00 12,010.00 BHGE CoilTrak MWD (R -28A) MWD MWD - Standard 0.00 Survey MD Inc Azi (azimuth) TVD TVDSS WS EIW Northing Easting 01.89 (usft) V) (1 lush) (usft) (usft) (usft) (usft) (usft) (°1100usft) 31.36 0.00 0.00 31.36 -19.84 0.00 0.00 5,977,049.160 634,371.180 0.00 100.00 0.07 14.58 100.00 48.80 0.04 0.01 5,977,049.201 634,371.190 0.10 200.00 0.10 110.95 200.00 148.80 0.07 0.11 5,977,049.230 634,371.286 0.13 300.00 0.12 103.95 300.00 248.80 0.01 0.29 5,977,049.177 634,371.470 0.02 400.00 0.20 79.47 400.00 348.80 0.02 0.56 5,977,049.189 634,371.743 0.10 500.00 0.18 60.38 500.00 448.80 0.13 0.87 5,977,049.304 634,372.049 0.07 600.00 0.18 63.73 600.00 548.80 0.28 1.15 5,977,049.456 634,372.324 0.01 700.00 0.20 72.33 700.00 648.80 0.40 1.46 5,977,049.584 634,372.629 0.03 800.00 0.27 85.88 800.00 748.80 0.47 1.86 5,977,049.661 634,373.029 0.09 900.00 - 0.72 127.28 899.99 848.79 0.10 2.59 5,977,049.311 634,373.770 0.55 1,000.00 1.78 149.92 999.97 948.77 -1.62 3.87 5,977,047.609 634,375.079 1.15 1,100.00 2.43 155.02 1,099.90 1,048.70 4.89 5.54 5,977,044.375 634,376.811 0.68 1,200.00 2.62 155.67 1,199.80 1,148.60 -8.89 7.38 5,977,040.404 634,378.719 0.19 1,300.00 2.55 156.25 1,299.70 1,248.50 -13.01 9.22 5,977,038.319 634,380.630 0.07 1,400.00 2.52 148.57 1,399.60 1,348.40 -16.92 11.26 5,977,032.445 634,382.742 0.34 1,500.00 2.52 139.88 1,499.51 1,448.31 -20.48 13.82 5,977,028.935 634,385.368 0.38 1,600.00 2.60 127.95 1,599.41 1,548.21 -23.55 17.03 5,977,025.917 634,388.628 0.54 1,700.00 2.83 118.77 1,699.30 1,648.10 -26.14 20.98 5,977,023.405 634,392.626 0.49 1,800.00 2.55 118.40 1,799.19 1,747.99 -28.38 25.10 5,977,021.234 634,396.786 0.28 1,900.00 2.08 116.65 1,899.10 1,847.90 -30.26 28.88 5,977,019.426 634,400.397 0.48 2,000.00 1.72 115.00 1,999.05 1,947.85 -31.70 31.66 5,977,018.032 634403405 0.36 V. See (usft) 0.00 0.01 -0.07 -0.26 -0.50 -0.74 -0.93 -1.15 -1.49 -2.3' -4.19 -7.09 -10.45 -13.85 -17.36 -21.18 -25.39 -30.06 -34.75 -38.78 -42.10 11212017 1.'49:30PM Page 3 COMPASS 5000.1 Build 81D BP BA�(ER bp Final Survey Report YES E,..,n, Company: North America - ALASKA - BP Local Coordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB (02 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB Q 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R -28A Survey Calculation Method; Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS Nis E/W Northing Easting DLeg V. Set; (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (Wousft) (usft) 2,100.00 1.50 113.75 2,099.01 2,047.81 -32.86 34.22 5,977,018.916 634,405.983 0.22 -44.91 2,200.00 1.32 118.70 2,198.98 2,147.78 -33.95 36.43 5,977,015.876 634,408.210 0.22 -47.36 2,300.00 1.20 126.17 2,298.96 2,247.76 -35.12 38.29 5,977,014.738 634,410.086 0.20 -49.54 2,400.00 1.07 129.93 2,398.94 2,347.74 -36.33 39.85 5,977,013.549 634,411.669 0.15 -51.47 2,500.00 0.98 123.92 2,498.92 2,447.72 -37.41 41.27 5,977,012.499 634,413.114 0.14 -53.22 2,600.00 1.00 124.18 2,598.90 2,547.70 -38.38 42.70 5,977,011.557 634,414.562 0.02 -54.92 2,700.00 1.02 125.25 2,698.89 2,647.69 -39.38 44.15 5,977,010.579 634,416.029 0.03 -56.66 2,800.00 0.97 122.87 2,798.87 2,747.67 40.35 45.59 5,977,009.632 634,417.484 0.06 -58.37 2,900.00 0.95 123.00 2,898.86 2,847.66 -41.27 47.00 5,977,008.747 634,418.906 0.02 -60.03 3,000.00 0.80 132.25 2,998.85 2,947.65 -42.19 48.21 5,977,007.848 634,420.134 0.21 -61.52 3,100.00 0.60 158.42 3,098.84 3,047.64 -43.14 48.92 5,977,006.905 634,420.860 0.37 -62.57 3,200.00 0.60 160.47 3,198.84 3,147.64 -44.12 49.29 5,977,005.931 634,421.245 0.02 -63.32 3,300.00 0.55 168.63 3,298.83 3,247.63 15.09 49.56 5,977,004.972 634,421.532 0.10 -63.97 3,400.00 0.58 170.78 3,398.83 3,347.63 46.08 49.73 5,977,004.005 634,421.725 0.04 -64.54 3,500.00 0.38 241.18 3,498.82 3,447.62 -46.72 49.52 5,977,003.342 634,421.528 0.58 -64.63 3,600.00 1.42 335.87 3,598.81 3,547.61 15.75 48.73 5,977,004.299 634,420.713 1.50 -63.41 3,700.00 1.45 335.32 3,698.78 3,647.58 13.47 47.69 5,977,006.560 634,419.638 0.03 -61.59 3,800A0 1.35 336.27 3,798.75 3,747.55 11.24 46.69 5,977,008.770 634,418.596 0.10 -59.74 3,900.00 1.27 333.13 3,898.73 3,847.53 -39.17 45.71 5,977,010.819 634,417.584 0.11 -57.98 4,000.00 1.23 333.37 3,998.70 3,947.50 -37.22 44.73 5,977,012.749 634,416.567 0.04 -56.27 4,100.00 1.22 334.08 4,098.68 4,047.48 -35.31 43.78 5,977,014.648 634,415.587 0.02 -54.60 4,200.00 1.20 333.53 4,196.66 4,147.46 -33.41 42.85 5,977,016.526 634,414.621 0.02 -52.96 4,300.00 1.07 337.62 4,298.64 4,247.44 -31.61 42.03 5,977,018.311 634,413.767 0.15 -51.45 4,400.00 0.97 338.27 4,398.62 4,347.42 -29.96 41.36 5,977,019.949 634,413.068 0.10 -50.15 4,500.00 0.83 343.83 4,498.61 4,447.41 -28.48 40.85 5,977,021.421 634,412.527 0.16 -49.05 4,600.00 0.35 338.95 4,598.60 4,547.40 -27.50 40.53 5,977,022.396 634,412.198 0.48 -48.36 4,700.00 0.20 0.47 4,698.60 4,647.40 -27.04 40.43 5,977,022.853 634,412.082 0.18 -48.07 11/212017 1:49:30PM Page 4 COMPASS 5000.1 Build 81D BP BA�UG by Final Survey Report (ER GEcampany Company: North America - ALASKA - BP Local Coordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R -28A Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) C) C) (usft) (daft) (usft) (usft) (usft) (usft) (on00us@) (usft) 4,800.00 0.13 8.25 479860 41747.40 -26.75 40.44 5,977,023.140 634,412.094 0.07 -47.96 4,900.00 0.55 357.78 4,898.60 4,847.40 -26.16 40.44 5,977,023.732 634,412.081 0.42 -47.71 5,000.00 370 327.53 4,998.52 4,947.32 -22.96 38.69 5,977,026.903 634,410.273 3.24 -44.77 5,100.00 5.47 314.75 5,098.20 5,047.00 -16.88 33.57 5,977,032.888 634,405.048 2.03 -37.56 5,200.00 8.17 296.78 5,197.49 5,146.29 -10.32 23.84 5,977,039.271 634,395.201 3.41 -25.97 5,300.00 11.00 291.85 5,296.09 5,244.89 -3.57 8.64 5,977,045.750 634,379.882 2.94 -9.34 5,400.00 13.48 289.00 5,393.81 5,342.81 3.78 -11.24 5,977,052.739 634,359.876 2.55 11.78 5,500.00 16.02 281.80 5,490.51 5,439.31 10.40 -35.77 5,977,058.915 634,335230 3.13 36.82 5,600.00 18.83 274.55 5,585.93 5,534.73 14.50 -65.38 5,977,062.487 634,305.560 3.55 65.38 5,700.00 22.17 272.15 5,679.58 5,628.38 16.49 -100.33 5,977,063.849 634,270.580 3.44 97.90 5,800.00 25.28 270.12 5,771.12 5,719.92 17.24 -140.55 5,977,063.880 634,230.359 3.22 134.66 5,900.00 28.52 268.38 5,860.29 5,809.09 16.61 -185.77 5,977,062.439 634,185.153 3.33 175.39 6,000.00 30.82 267.05 5,947.17 5,895.97 14.62 -235.23 5,977,059.560 634,135.747 2.39 219.37 6,100.00 31.08 266.70 6,032.94 5,98174 11.82 -286.58 5,977,055.836 634,084.457 0.32 264.72 6,200.00 31.13 266.82 6,118.56 6,06236 8.90 -338.16 5,977,051.992 634,032.943 0.08 310.24 - 6,300.00 31.53 268.50 6,203.98 6,152.78 6.78 -390.11 5,977,048.943 633,981.045 0.96 356.4- 6,400.00 32.02 272.10 6,289.00 6,237.80 7.06 -442.74 5,977,048.286 633,928.416 1.96 404.25 6,500.00 32.18 272.48 6,373.71 6,322.51 9.19 -495.84 5,977,049.458 633,875.294 0.26 453.27 6,600.00 32.37 272.65 6,458.26 6,407.06 11.58 -549.19 5,977,050.891 633,821.919 0.21 502.62 6,700.00 32.50 272.63 6,542.66 6,491.46 14.05 -602.76 5,977,052.400 633,768.310 0.13 552.23 6,800.00 32.60 272.53 6,626.95 6,575.75 16.47 -656.51 5,977,053.858 633,714.531 0.11 601.96 6,900.00 32.60 272.92 6,711.20 6,660.00 19.03 -710.33 5,977,055.454 633,660.682 0.21 651.82 7,000.00 _ 32.43 273.60 6,795.52 6,744.32 22.09 -763.99 5,977,057.548 633,606.976 0.40 701.75 7,100.00 31.72 274.63 6,880.26 6,829.06 25.89 -816.96 5,977,060.403 633,553.956 0.90 751.36 7,200.00 31.28 275.30 6,965.52 6,914.32 30.41 -869.01 5,977,063.989 633,501.834 0.56 80044 7,300.00 31.02 276.67 7,051.10 6,999.90 35.80 -920.45 5,977,068.456 633,450.307 0.75 849.34 7,400.00 30.72 277.48 7,136.94 7,085.74 42.12 -971.37 5,977,073.860 633,399.288 0.51 898.16 11@12017 1:49:30PM Page 5 COMPASS 5000.1 Build BID BP BAT 40 bp final Survey Report UGHES GEcompany Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB R Pad Well: R-28 Wellbore: R -28A Design: R -28A Survey MD Inc TVD (usft) 1°1 N/S 7,500.00 30.85 7,600.00 30.67 7,700.00 30.75 7,800.00 31.48 7,900.00 32.38 8,000.00 33.08 8,100.00 33.42 8,200.00 33.67 8,300.00 33.38 8,400.00 32.18 8,500.00 31.55 8,600.00 31.85 8,700.00 32.17 8,800.00 32.13 8,900.00 31.03 9,000.00 30.37 9,100.00 30.00 9,200.00 30.37 Tie in to R-28 633,298.179 9,249.00 30.53 KOP-TOWS 7,394.76 9,280.76 34.84 Interpolated Azimuth -1,122.14 9,310.69 45.01 Interpolated Azimuth 0.12 9,345.78 55.75 let good survey 7,429.17 9,382.59 68.47 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well R-28 KB @ 51.20usft (ORIG KELLY BUSHING) KB @ 51.20usft (ORIG KELLY BUSHING) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 An (azimuth) TVD TVDSS N/S -1,960.95 E/W Northing 35.61 Easting DLeg V. Sec (°) (usft) (usft) (usft) 632,382.316 (usft) (usft) 306.93 (usft) (oll00usft) (usft) 27970 7,222.85 7,171.65 49.77 1,933.34 -1,021.97 5,977,080597 633,348.564 1.14 947.25 281.97 7,306.78 7,257.58 59.38 -1,072.19 5,977,089.304 633,298.179 1.17 996.83 282.15 7,394.76 7,343.56 70.05 -1,122.14 5,977,099.076 633,248.057 0.12 1,046.60 280.98 7,480.37 7,429.17 80.40 -1,172.76 5,977,108.520 633,197.259 0.95 1,096.86 280.33 7,565.24 7,514.04 90.18 -1,224.74 5,977,117.351 633,145.120 0.96 1,148.10 280.85 7,649.37 7,598.17 100.12 -1,277.88 5,977,126.345 633,091.809 0.75 1,200.47 281.20 7,732.99 7,681.79 110.60 -1,331.70 5,977,135.864 633,037.817 0.39 1,253.67 280.78 7,816.34 7,765.14 121.14 -1,385.95 5,977,145.423 632,983.395 0.34 1,307.29 279.42 7,899.70 7,848.50 130.82 -1,440.32 5,977,154.133 632,928.864 0.81 1,360.66 277.18 7,983.78 7,932.58 138.65 -1,493.88 5,977,161.002 632,875.174 1.71 1,412.51 278.03 8,066.71 8,017.51 145.64 -1,546.21 5,977,167.046 632,822.735 0.77 1,462.89 278.77 8,153.79 8,102.59 153.31 -1,598.19 5,977,173.790 632,770.627 0.49 1,513.24 279.15 8,238.59 8,187.39 161.57 -1,650.55 5,977,181.105 632,718.132 0.38 1,564.19 279.97 8,323.25 8,272.05 170.41 -1,703.02 5,977,189.000 632,665.513 0.44 1,615.48 276.98 8,40844 8,357.24 179.04 -1,754.87 5,977,196.699 632,613.720 1.22 1,665.94 281.25 8,494.43 8,443.23 167.99 -1,804.93 5,977,204.752 632,563.317 1.33 1,715.2'', 283.28 8,580.88 8,529.68 198.57 -1,854.05 5,977,214.543 632,514.011 1.09 1,764.30 285.50 8,667.32 8,616.12 211.16 -1,902.75 5,977,226.166 632,465.106 1.18 1,813.72 286.13 8,709.56 8,658.36 217.93 -1,926.64 5,977,232.504 632,441.098 0.73 1,838.23 288.00 8,736.29 8,885.09 222.98 -1,943.02 5,977,237.256 632,424.626 13.94 1,855.21 293.00 8,759.21 8,708.01 229.78 -1,960.95 5,977,243.730 632,406.564 35.61 1,874.33 300.12 8,781.57 8,730.37 241.95 -1,985.00 5,977,255.467 632,382.316 34.33 1,901.28 306.93 8,798.77 8,747.57 259.96 -2,011.98 5,977,272.991 632,355.019 38.20 1,933.34 11/212017 1:49:30PM Page 6 COMPASS 5000.1 Build 81D BP BA ER by Final Survey Report F UGHES �E company Company: North America -ALASKA - BP Local Co-ordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R -28A - Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCPt Survey MD Inc All (azimuth) TVD TVDSS NIS ENI/ Northing Easting DLeg V. Sec (usft) (°( (') (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 9,410.88 78.26 308.82 8,806.86 8,755.66 276.59 -2,033.35 5,977,289.233 632,333,364 35.19 1,959.73 9,443.54 89.54 311.24 8,810.33 8,759.13 297.45 -2,058.17 5,977,309.641 632,308.177 35.31 1,991.04 9,470.66 98.69 313.80 8,808.38 8,757.18 315.70 -2,078.08 5,977,327.538 632,287.938 35.03 2,016.80 9,500.11 108.07 315.25 8,801.58 8,750.38 335.77 -2,098,49 5,977,347.229 632,267.175 32.21 2,043.78 9,530.50 109.14 313.06 8,791.88 8,740.88 355.83 -2,119.15 5,977,366.917 632,246.159 7.68 2,070.98 9,560.50 111.38 309.74 8,781.49 8,730.29 374.44 -2,140.25 5,977,385.146 632,224.729 12.79 2,097.97 9,590.02 112.40 308.00 8,770.48 8,719.28 391.63 -2,161.58 5,977,401.950 632,203.102 6.47 2,124.56 9,620.19 113.05 305.51 8,758.83 8,707.63 408.28 -2,183.87 5,977,418.198 632,180.516 7.91 2,151.81 9,650.50 112.19 304.59 8,747.17 8,695.97 424.35 -2,206.77 5,977,433.850 632,157.329 3.99 2,179.35 9,680.17 110.78 304.02 8,736.30 8,685.10 439.91 -2,229.58 5,977,448.996 632,134.250 5.08 2,206.60 9,700.26 110.03 302.71 8,729.30 8,678.10 450.26 -2,245.31 5,977,459.067 632,118.342 7.16 2,225.23 9,730.21 108.24 300.60 8,71948 8,666.28 465.11 -2,269.39 5,977,473.477 632,093.998 8.95 2,253.33 9,760.34 105.58 300.15 8,71072 8,659.52 479.68 -2,294.26 5,977,487.602 632,068.874 8.94 2,282.03 9,790.64 104.23 298.15 8,702.92 8,651.72 493.94 -2,319.83 5,977,501.401 632,043.054 7.78 2,311.23 9,820.13 103.44 294.98 8,695.87 8,644.67 506.75 -2,345.44 5,977,513.741 632,017.222 10.78 2,339.85 9,850.23 103.18 292.21 8,688.94 8,637.74 518.47 -2,372.28 5,977,524.980 631,990.179 9.00 2,369,1'- 9,880.88 100.98 290.95 8,682.52 8,631.32 529.49 -2,400.15 5,977,535.499 631,962.119 8.23 2,389.04 9,910.31 99.44 288.04 8,677.31 8,626.11 539.15 -2,427.45 5,977,544.670 631,934.652 11.05 2,427.87 9,940.14 97.20 285.43 8,672.99 8,621.79 547.65 -2,455.71 5,977,552.657 631,906.245 11.46 2,457.07 9,970.22 98.19 281.79 8,668.96 8,617.76 554.66 -2,484.67 5,977,559.151 631,877.160 12.44 2,486.29 9,999.79 97.76 278.48 8,664.86 8,613.66 559.81 -2,513.50 5,977,563.785 631,848.251 11.18 2,514.59 10,030.58 95.01 275.80 8,661.43 8,610.23 563.62 -2,543.85 5,977,567.040 631,817.834 12.43 2,543.71 10,060.60 94.21 272.49 8,659.02 8,607.82 565.78 -2,573.69 5,977,568.667 631,787.962 11.31 2,571.67 10,091.72 93.72 268.97 8,656.87 8,605.67 566.17 -2,604.73 5,977,568.506 631,756.925 11.39 2,599.96 10,120.85 92.15 267.12 8,655.37 8,604.17 565.18 -2,633.80 5,977,566.992 631,727.877 8.32 2,625.89 10,150.82 90.77 271.00 8,654.61 8,603.41 564.69 -2,663.75 5,977,565.964 631,697.943 13.74 2,652.83 10,180.57 91.97 276.20 8,653.90 8,602.70 566.56 -2,693.43 5,977,567.298 631,668.245 17.93 2,680.51 11212017 1:49:30PM Page 7 COMPASS 5000.1 Build 810 b BP Bi�(ER p final Survey Report jUGHES a GEcomWny Comparry: North America - ALASKA - BP Local Coordinate Reference: Well R-28 Projece Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB Q 51.20usft (ORIG KELLY BUSHING) Wall: R-28 North Reference: True Wellbore: R -28A Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD iVDSS NIS EIW Northing Basting DLag V. Sec (usft) C) C) (usft) (usft) (usft) (usft) (usft) (usft) (°HOOusft) (usft) 10,210.65 92.80 281.64 8,652.65 8,601.45 571.21 -2,723.11 5,977,571.423 631,638.489 18.28 2,709.36 10,240.63 92.80 287.58 8,651.18 8,599.98 578.76 -2,752.07 5,977,578.452 631,609.398 19.79 2,738.82 10,272.01 93.19 292.90 8,649.54 8,598.34 589.60 -2,781.46 5,977,588.759 631,579.819 16.98 2,770.03 10,300.80 93.19 298.36 8,647.94 8,596.74 602.03 -2,807.37 5,977,600.721 631,553.695 18.94 2,798.77 10,330.81 92.09 303.53 8,646.55 8,595.35 617.44 -2,833.07 5,977,615.667 631,527.724 17.60 2,828.57 10,361.08 90.74 308.42 8,645.81 8,594.61 635.21 -2,857.55 5,977,632.994 631,502.930 16.75 2,858.27 10,390.75 89.14 305.08 8,645.84 8,594.64 652.96 -2,881.32 5,977,650.313 631,478.849 12.48 2,887.31 10,420.98 89.36 300.93 8,646.23 8,595.03 669.42 -2,906.66 5,977,666.317 631,453.216 13.75 2,917.24 10,450.88 88.68 296.97 8,646.74 8,595.54 683.89 -2,932.82 5,977,680.312 631,426.808 13.44 2,947.06 10,480.78 87.60 293.14 8,647.72 8,596.52 696.54 -2,959.88 5,977,692.477 631,399.521 13.30 2,976.94 10,510.66 89.51 289.02 8,648.47 8,597.27 707.28 -2,987.75 5,977,702.715 631,371.471 15.19 3,006.73 10,541.09 89.63 284.90 8,648.70 8,597.50 716.16 -3,016.85 5,977,711.066 631,342.219 13.54 3,036.85 10,570.57 89.14 284.94 8,649.01 8,59781 723.75 -3,045.33 5,977,718.144 631,313.606 1.67 3,065.88 10,600.48 86.44 283.16 8,650.17 8,598.97 731.00 -3,074.32 5,977,724.878 631,284.493 10.81 3,095.22 10,630.37 87.45 278.92 8,651.76 6,600.56 736.72 -3,103.61 5,977,730.065 631,255.109 14.56 3,124.18 _ 10,660.54 86.99 275.21 8,653.22 8,602.02 740.42 -3,133.51 5,977,733.234 631,225.150 12.38 3,152.& 10,690.65 85.33 271.30 8,655.24 8,604.04 742.13 -3,163.50 5,977,734.402 631,195.140 14.08 3,180.74 10,720.96 87.33 267.18 8,657.18 8,605.98 741.73 -3,193.73 5,977,733.458 631,164.917 15.08 3,207.97 10,750.78 89.20 269.56 8,658.09 8,606.89 740.88 -3,223.53 5,977,732.077 631,135.148 10.15 3,234.61 10,780.56 89.82 274.86 8,658.34 8,607.14 742.03 -3,253.27 5,977,732.691 631,105.389 17.92 3,262.06 10,810.66 89.57 281.18 8,658.50 8,607.30 746.22 -3,283.06 5,977,736.354 631,075.531 21.01 3,290.83 10,843.51 89.02 287.59 8,658.91 8,607.71 754.38 -3,314.86 5,977,743.938 631,043.591 19.58 3,323.10 10,870.68 88.49 291.74 8,659.50 8,608.30 763.52 -3,340.44 5,977,752.616 631,017.860 15.39 3,350.14 10,900.66 69.63 297.02 8,659.99 8,608.79 775.89 -3,367.73 5,977,764.493 630,990.352 18.01 3,380.10 10,930.59 90.28 300.36 8,660.01 8,608.81 790.25 -3,393.98 5,977,778.386 630,963.849 11.37 3,409.97 10,960.34 88.56 303.67 8,660.31 8,609.11 806.02 -3,419.20 5,977,793.698 630,938.353 12.54 3,439.49 10,990.54 91.01 308.11 8,660.43 8,609.23 823.72 -3,443.66 5,977,810.953 630,913.584 16.79 3,469.13 111212017 1.49:30PM Page 8 COMPASS 5000.1 Build 81D BP BA ER bp Final Survey Report ,f�UGHES I,fr „v Company: North America - ALASKA - BP Local Co-ordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R -28A Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCP1 Survey - - MD Inc AN(azlrnuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) r) (°) (usft) (usft) (usft) (usft) (waft) (usfq (°1100usft) (Usft) 11,020.84 94.18 313.01 8,659.05 8,607.85 843.39 -3,466.65 5,977,830.209 630,890.249 19.25 3,498.28 11,050.74 94.45 309.15 8,656.80 8,605.60 862.98 -3,489.12 5,977,849.390 630,867.433 12.90 3,526.92 11,080.74 94.49 305.43 8,654.46 8,603.26 881.10 -3,512.91 5,977,867.076 630,843.324 12.36 3,556.14 11,110.52 94.64 301.53 8,652.09 8,600.89 897.47 -3,537.86 5,977,883.001 630,818.281 13.06 3,585.50 11,139.65 94.40 298.33 8,649.80 8,598.60 911.96 -3,582.82 5,977,897.034 630,792.864 10.98 3,614.43 11,170.70 92.98 294.16 8,647.80 8,596.60 925.66 -3,590.61 5,977,910.230 630,764.840 14.16 3,645.40 11,200.77 93.81 290.74 8,646.02 8,594.82 937.12 -3,618.35 5,977,921.192 630,736.904 11.68 3,675.38 11,230.54 94.43 285.18 8,643.88 8,592.68 946.27 -3,646.58 5,977,929.836 630,708.512 18.74 3,704.84 11,260.38 95.99 282.57 8,641.17 8,589.97 953.40 -3,675.43 5,977,936.444 630,679.545 10.16 3,733.99 11,290.63 94.24 278.69 8,638.47 8,587.27 958.95 -3,705.03 5,977,941.467 630,649.847 14.02 3,763.17 11,320.55 94.18 275.38 8,636.27 8,585.07 962.61 -3,734.64 5,977,944.589 630,620.178 11.03 3,791.55 11,350.69 92.43 277.68 8,634.53 8,583.33 966.03 -3,764.54 5,977,947.475 630,590.232 9.58 3,820.09 11,380.85 93.69 282.87 8,632.92 8,581.72 971.40 -3,704.16 5,977,952.312 630,560.520 17.68 3,849.21 11,410.55 93.44 288.74 8,631.07 8,579.87 97947 -3,822.67 5,977,959.869 630,531.873 19.74 3,878.45 11,440.32 89.69 291.59 8,630.26 8,579.06 98972 -3,850.59 5,977,969.622 630,503.769 15.82 3,908.10 11,480.49 90.43 297.18 8,630.22 8,579.02 1,006.30 -3,887.17 5,977,985.541 630,466.909 14.04 3,948.25 11,510.60 89.45 298.23 8,630.25 8,579.05 1,020.30 -3,913.82 5,977,999.058 630,440.007 4.77 3,978.33 11,540.70 87.36 300.23 8,631.09 8,579.89 1,034.99 -3,940.08 5,978,013.275 630,413.496 9.61 4,008.33 11,570.53 85.54 303.62 8,832.94 8,581.74 1,050.73 -3,965.34 5,978,028.558 630,387.955 12.88 4,037.88 11,600.64 86.44 309.08 8,635.04 8,583.84 1,068.53 -3,989.52 5,978,045.917 630,363.460 16.33 4,06732 11,640.64 86.96 312.60 8,637.35 8,586.15 1,094.64 4,019.73 5,978,071.480 630,332.793 8.88 4,105.73 11,670.81 87.33 306.89 8,638.84 8,587.64 1,113.77 -4,042.74 5,978,090.193 630,309.449 19.07 4,134.66 11,700.77 87.45 303.40 8,640.21 6,589.01 1,131.11 -4,067.37 5,978,107.088 630,284.512 11.57 4,164.32 11,730.75 86.96 300.17 8,641.68 8,590.48 1,146.88 -4,092.82 5,978,122.399 630,258.785 10.88 4,194.05 11,760.64 85.14 296.01 8,643.74 8,592.54 1,160.92 -4,119.12 5,978,135.962 630,232.241 15.16 4,223.81 11,800.68 84.00 291.75 8,647.53 8,596.33 1,177.05 -4,155.56 5,978,151.436 630,195.522 10.97 4,263.66 11,840.82 85.91 287.77 8,651.06 8,599.86 1,190.56 -4,193.18 5,978,164.273 630,157.668 10.96 4,303.46 1121/2017 1*49:30PM Page 9 COMPASS 5000.1 Build 81D BP BTS ER by Final Survey Report UGHES GEmmpany Company: NOM America - ALASKA - BP Local Co-ordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R -28A Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) V) (I lush) (usft) (usft) (usft) (usft) (usft) (01100uift) (usft) 11,870.68 85.97 287.65 8,653.17 8,601.97 1,199.62 -4,221.55 5,978,172.623 630,129.139 0.45 4,333.01 11,900.72 89.82 286.44 8,654.28 8,603.06 1,208.42 4,250.25 5,976,181.104 630,100.293 13.43 4,362.73 11,930.76 94.43 289.95 8,653.16 8,601.96 1,217.79 -4,278.75 5,978,189.959 630,071.625 19.28 4,392.53 11,960.60 92.89 295.53 8,651.25 8,600.05 1,229.30 -4,306.21 5,978,200.972 630,043.973 19.36 4,422.27 11,977.75 92.00 298.07 8,650.52 8,599.32 1,237.02 -4,321.50 5,978,208.421 630,028.546 15.68 4,439.40 12,010.00 92.00 298.07 8,649.40 8,598.20 1,252.19 -4,349.94 5,978,223.073 629,999.842 0.00 4,471.58 Projection to TD Design Annotations Measured Vertical Local Coordinates Depth Depth •N/ -S Ef-W lush) (usft) (usft) (usft) Comment 9,200.00 8,667.32 21116 -1,902.75 Tie in to R-28 9,249.00 8,709.56 217.93 -1,926.84 KOP-TOWS 9,280.76 8,736.29 222.98 -1,943.02 Interpolated Azimuth 9,310.69 8,759.21 229.78 -1,960.95 Interpolated Azimuth -. 9,345.78 8,781.57 241.95 -1,985.00 1St good Survey 12,010.00 8,649.40 1,252.19 -4,349.94 Projection to TD Prepared By: Jose Vazquez - Tech Support Engineer - BHGE 11@112017 1:49:30PM Page 10 COMPASS 5000.1 Build 810 5979000 5910850 5978100 5918550 5918400 59782W R -28/19-28A S 5918100 e ssn9m �59n600 c s9nfim z 5911599. 59773501 59n20D R- /R-2' SBn050 5918900 59]6750, 5916600. 5916450'. 5976900;R -11/14-11A 1PB1 R -02/R -02A \ ^& 0 m Easting(150usftrin) AOGCC 1.9 IEfEl E.TM BA. �(ER UGHES E, mp, P N N N P 0 D O O 0 O i5979450 -0g qp. .gg. ... .........0 O O 3/ -0 5979300 g000 59/9150 R -28A ..5979000 5978850 5978700 5918.550 5918400 5918250 5000 0 5918100 E 5M� 591/95pw ssneao Ne 5911650 H ssnsaB'o�� p q0 4000 �, -- 5977350 �O 5 5977050 4000 g0p0 '"5916900 0 5916150 5976450 P-00: PT ho Bay ��.p irm �3.P DETAILS: R 2SA Ale: PBRPaO Well: R -2B 4'TWELLBORE r..Lm R.28A VeN¢i(1Y 0 bpWell6ora: a28A � +®.� Parent WBII5a 9-20 Deagn: 9Z9A(92&928A) weiaa'ci®i D: Teon M0: 8200.00 Naw�a0�9n9 Calor Post Drilling Eaasdngg(15p0usft/in)) N q 41 fNJ q V 41 41 p fJ 41 41 m T q d fi 41 NJ L1 Y Y 4 fWJ Y O O OOOOOOO 59]9450 R -41/R-41 5979:YA N O N OOOOOOoOOO 3 F /R 31AOD R-3 1/R-31 10 O 5979000 5910850 5978100 5918550 5918400 59782W R -28/19-28A S 5918100 e ssn9m �59n600 c s9nfim z 5911599. 59773501 59n20D R- /R-2' SBn050 5918900 59]6750, 5916600. 5916450'. 5976900;R -11/14-11A 1PB1 R -02/R -02A \ ^& 0 m Easting(150usftrin) AOGCC 1.9 IEfEl E.TM BA. �(ER UGHES E, mp, P N N N P 0 D O O 0 O i5979450 -0g qp. .gg. ... .........0 O O 3/ -0 5979300 g000 59/9150 R -28A ..5979000 5978850 5978700 5918.550 5918400 5918250 5000 0 5918100 E 5M� 591/95pw ssneao Ne 5911650 H ssnsaB'o�� p q0 4000 �, -- 5977350 �O 5 5977050 4000 g0p0 '"5916900 0 5916150 5976450 North America - ALASKA - BP Prudhoe Bay PB R Pad R-28 R -28A R -28A AOGCC Post Drilling Offset Report 04 December. 2017 BA ER I UGHES a GE company BP BA ER by AntiCollision Report F�U ,H 0 Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB R Pad Site Error: 0.00usft Reference Well: R-28 Well Error: 0.00usft Reference Wellbore R -28A Reference Design: R -28A Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well R-28 KB Q 51.20usft (ORIG KELLY BUSHING) KB @ 51.20usft (ORIG KELLY BUSHING) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Reference R -28A Filter type: NO GLOBAL FILTER: Using user defined selection 8 filtering criteria WARNING: There is hidden tight data in this project Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 12/4/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 9,200.00 1 : Schlumberger GCT multishot (R-28) GCT -MS Schlumberger GCT multishot 9,249.00 12,010.00 BHGECoilTmk MWD(R-28A) MWD MWD -Standard Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) PB R Pad R-01 - R-01 - R-01 3,408.82 3,425.00 16.50 58.14 -41.35 FAIL- Major Risk R-02 - R-02 - R-02 3,612.47 3,625.00 207.20 50.03 157.18 Pass - Major Risk R-02 - R -02A - R -02A WPI 0 3,612.47 3,625.00 207.20 50.03 157.18 Pass - Major Risk R-03 - R-03 - R-03 2,998.93 3,000.00 332.34 43.08 289.27 Pass - Major Risk R-03 - R -03A- R -03A 3,003.41 3,000.00 332.35 43.11 289.25 Pass - Major Risk R-03 - R -03B - R -03B 3,003.41 3,000.00 332.35 43.11 289.25 Pass - Major Risk R-04- R-04- R-04 2,999.73 3,000.00 448.22 46.37 401.86 Pass - Major Risk R -07 -R -07-R-07 3,839.96 3,850.00 20.24 47.05 -26.81 FAIL - Major Risk R-07 - R -07A - R -07A 3,839.96 3,850.00 20.24 47.05 -26.81 FAIL - Major Risk R-11 - R-11 - R-11 4,914.79 5,300.00 197.23 193.08 4.83 Pass - Major Risk R-11 - R -11A- R -11A 4,917.31 5,300.00 197.43 193.46 4.87 Pass - Major Risk R -14 -R -14-R-14 10,520.06 10,025.00 424.32 646.54 -203.93 FAIL - Major Risk R-14 - R -14A- R -14A 10,725.00 10,050.00 451IS7 682.54 -225.07 FAIL - Major Risk R-14 - R -14B - R -14B 4,367.28 4,900.00 237.83 167.81 104.06 Pass - Major Risk R-14-R-14BPB1-R-14BP01 4,367.28 4,900.00 237.83 167.81 104.06 Pass - Major Risk R-28 - R-28 - R-28 Out of range R-29 - R-29 - R-29 3,802.15 3,825.00 104.44 54.52 49.94 Pass - Major Risk R-29 - R -29A - R -29A 11,675.00 10,625.00 126.26 254.55 -60.60 FAIL - Major Risk R-30 - R-30 - R-30 2,207.12 2,225.00 232.32 44.68 187.67 Pass - Major Risk R-30 - R -30A - R -30A WP10 2,207.12 2,225.00 232.32 44.68 187.67 Pass - Major Risk R-31 - R-31 - R-31 3,321.46 3,325.00 276.33 54.29 222.04 Pass - Major Risk R-31 - R -31A- R -31A 3,321.46 3,325.00 276.33 54.29 222.04 Pass - Major Risk R-35 - R-35 - R-35 396.75 400.00 113.07 8.70 104.36 Pass - Major Risk R-35 - R -35A - R -35A 396.75 400.00 113.07 8.70 104.36 Pass - Major Risk R-35 - R-35AL1 - R-35AL1 71.44 75.00 109.92 3.25 106.67 Pass - Major Risk R -39 -R -39-R-39 8,995.49 8,875.00 138.38 165.23 -16.52 FAIL - Major Risk R-39 - R -39A - R -39A 8,995.49 8,875.00 138.38 165.38 -16.66 FAIL - Major Risk R-39-R-39AL1-R-39AL1 8,995.49 8,875.00 138.38 165.57 -16.78 FAIL - Major Risk R-39-R-39ALl PB1-R-39AL1 PB1 8,995.49 8,875.00 138.38 165.57 -16.78 FAIL - Major Risk R41 -R41 -R41 775.38 775.00 53.98 14.81 39.23 Pass - Major Risk 12/4/2017 3.31:33PM // t t // j j /F/aoe 2 of 3 / / / / COMPASS 5000.1 Build 81D BP BAER by Anticollision Report UGHES OmOany Company: North America - ALASKA - BP Project: Prudhoe, Bay Reference Site: PB R Pad Site Error: 0.0ousfl Reference Well: R-28 Well Error: 0.0ousft Reference Wellbore R -28A Reference Design: R -28A Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well R-28 KB @ 51.20usft (ORIS KELLY BUSHING) KB @ 51.20usft (ORIG KELLY BUSHING) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to KB @ 51.20usft (ORIS KELLY Coordinates are relative to: R-28 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK Central Meridian is 150° 0'0.000 W' Grid Convergence at Surface is: 1.03° 12/4/2017 331:33PM // ( t // ) ) /q'ege 3 of 3 1 / / / COMPASS 5000.1 Build 81D Printed 12/12/2017 4:60:30PM North America -ALASKA- BP Page 1 of 2 ---- Cementlng Report Common Well Name: R-28 / 01 --- - - — Report no.: 1 Reporttlate: 11/17/2017 Prejecl: Prudhoe Bay Site: PB R Pad_ Spud Daterlime: 6/21/1992 Event Type: COM -ONSHORE (CON) _ Start Date: 11/18/2017 Entl Date: 11/19/2017 AFE No.: Contractor: NABORS ALASKA DRILLING INC. Rig Name/No.: CDR-2Ri9 Release: 11/19/2017 X1018DM-C: (1,168,034.00) BPUOI: USA00000324 Active tlatum: KB @51.20usft (above Mean Sea Level) - Gervand Information Job type: Primary Cement job start date/time: 11/17/2017 3:0OPM Job end datettime: 11/17/2017 6:OOPM Cement Company: SCHLUMBERGER Cementer: DYLAN WAUGH Cemented String: PRODUCTION LINER i String Size: 2.875 (in) String Set TMD: 12,001.00 (usft) Hole Size: 4.250 (in) Pipe Movement Pipe Movement: NO MOVEMENT Rotating Time (Start -End): RPM: Rotating Torque (in tlavg/max): (11-I1bf) Reciprocating Time (Start -End): Recip Drag Up/Down: - (kip) SPM: Stroke Length: Flydd Nems: CEMENT Fluids (1 of 1) Slurry Type: CEMENT Purpose: PRIMARY Class: G -CLASS Description LEAD SLURRY Density: 15.30 (ppg) Yield: 1.3100 (ft3/sk) Mix Water Ratio: 6.094 (gaVsk94) Excess: 20.00(%) Mix Method BATCH Sacks Used: 163.80 (9411b sacks) Water Volume: 23.8 (bbl) Excess Slurry Volume: 6.4 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 38.2 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 9.60 (ppg) PV: 3.00 (cp) VP: 18.000 (Ibf/t00ft3) Viscosity: 47.00 (s/qt) Gels 10 Sec: 14.000 (Ibf/100ftl Gels 10 Min: 16.000 (Ibf/100ft3) Name Type Amount Units Concentration Unit 0047 ANTIFOAM AGENT 0.100 GAL/SX D206 ANTIFOAMAGENT 0.100 GAL/SX D065 DISPERSANT 1.000 % BWOC D167 FLUID LOSS 0.100 % BWOC D600G GASBLOK 1.500 GAUSX D163 CEMENT 5.000 %BWOC D800 RETARDERAID 0.050 %BWOC Fluid Teats Thick time hick Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength (hr) temp. (%) temp. (CC130min) temp. press.Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) ("F) (°F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) min(psi) °F (min) 4.97 90.00 0.00 80.00 38.0 180.00 1,000.00 Printed 12/12/2017 4:60:30PM Printed 12/12/2017 4:50:30PM Page 2 of 2 North America - ALASKA - BP Cementing Report - - - — - -- 1 Report no.: 1 Report date: 11/17/2017 Common Well Name: R-28/ 01 Project Prudhoe Bay Site. PB R Pad Sputl Date/Tlme: 6Y11/1992 Event Type: COM- ONSHORE (CON) Start Date. 11/16/2017 �Entl Date: 11/19/2017 AFE No Contractor: NABORSALASKA DRILLING INC. Rig NaCDR-2 Rig Release: 11/19/2017 X3-01BDM C. (1,1689034 00 ) BPUOI'. USA00000324 Active tlatum: KB �51.20usR (above Mean Sea Levep stapes Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom Plug Pressure Float Pressure Rmums Cirwlate Cmt Vol to Total Annular no. (usft) (usft) Rate Press. Plug Plug Bampad Bumped Hem Hem Prior Surface Mud Lost Flaw (gpm) (psi) (hr) (bbl) (bbl) After (psi (min) 1 PRIMARY CEMENT 8,854.00 12,001.001 Y Y y Y leumphp Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumpetl Disp. Rate TMD TMD Pmp date/time job Used temp. temp. (bbl) Rate (bbymin) (usft) (usft) (scf) bbl/min Tests Casing Test Shoe Test Liner Top Teat Test Pressure: 3,500.00 (psi) FIT/LOT: (ppg) Liner Overlap: (usft) Time: (min) Tool: N Positive Test: (ppg) Positive Test Tool: N Cement Found betvreen Shoe and Collar: N Open Hole Length: (usft) Negative Test: (ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: 8,854.00 (usft) Under Pressure: (psi) How Determined: TOP OF LINER Bond Quality: TOC Sufficient: Y CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey' N Remedial Cement Required: N Him Prior to Log: (hr) How Determined: 0 Printed 12/12/2017 4:50:30PM BA ER 00 PRINT DISTRIBUTION LIST F UGHES aGEcompany RECEIVE COMPANY BP Exploration Alaska Inc. WELL NAME R -28A DEC 0 6 2017 FIELD Prudhoe Bay Unit nnrGc COUNTY PRUDHOE BAY BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rideri -.Ok"I�- by `tiN` RECEIVED DEC 0 6 2017 AOGCC North America - ALASKA - BP Prudhoe Bay PB R Pad R-28 R -28A 500292227301 Design: R -28A Final Survey Report 21 November. 2017 BA ER BAT a GE company 21 7019 28848 41111111 # by R -28A BP Final Survey Report BAKER rjUGHES 'ylY1ra Well GE<oi„nary Company: North America - ALASKA - BP Local Coordmate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R -28A Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCP1 Project Prudhoe Bay, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK [4267'158641 Using Well Reference Point Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor Site PB R Pad, TR -12-13 Site Position: Northing: 5,975,706.220 usft Latitude: 70" 20'29.100 N From: Map Easting: 637,446.420 usft Longitude: 148° 53'4.328 W Position Uncertainty' 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.05 ` Wellbore R -28A Magnetics Model Name Sample Date Declination Dip Angle Field Strength (9 PI (nT) BGGM2017 11/1/2017 17.60 80.99 57,494 Design R -28A Audit Notes: Well R-28, R-28 Version: Phase: ACTUAL Tie On Depth: 9,200.00 Well Position +N/ -S 0.00 usft Northing: 5,977,049.160 usft Latitude: 700 20'42.855 N (usft) +E/ -W 0.00 usft Easting: 634,371.180 usft Longitude: 148° 54'33.451 W Position Uncertainty 0.00 usft Wellhead Elevation: 19.84 usft Ground Level: 18.74 usft Wellbore R -28A Magnetics Model Name Sample Date Declination Dip Angle Field Strength (9 PI (nT) BGGM2017 11/1/2017 17.60 80.99 57,494 Design R -28A Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,200.00 Vertical Section: Depth From (TVD) +N/S +E/ -W Direction (usft) (usft) (usft) (1) 31.36 0.00 0.00 295.00 11/21/2017 1'49:30PM Page 2 COMPASS 5000 1 Build 81D by BP BA�UG Final Survey Report CER 6E mmpairy Company: North America - ALASKA - BP Local Co-ordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R -20A Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM R5K-Alaska PROD -ANCP1 Survey Survey Program Date 11/21/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description MD 100.00 9,200.00 1 : Schlumberger GCT multishot (R-28) GCT -MS Schlumberger GCT multishot TVDSS 9,249.00 12,010.00 BHGE Coin-rak MWD (R -28A) MWD MWD -Standard Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) (a) (') (usft) (usft) (usft) (usft) (usft) (usft) (°I10ousft) (usft) 31.36 0.00 0.00 31.36 -19.84 0.00 0.00 5,977,049.160 634,371.180 0.00 0.00 100.00 0.07 14.58 100.00 48.80 0.04 0.01 5,977,049.201 634,371.190 0.10 0.01 200.00 0.10 110.95 200.00 148.80 0.07 0.11 5,977,049.230 634,371.286 0.13 -0.07 300.00 0.12 103.95 300.00 248.80 0.01 0.29 5,977,049.177 634,371.470 0.02 -0.26 400.00 0.20 79.47 400.00 348.80 0.02 0.56 5,977,049.189 634,371.743 0.10 -0.50 500.00 0.18 60.38 500.00 448.80 0.13 0.87 5,977,049.304 634,372.049 0.07 -0.74 600.00 0.18 63.73 600.00 548.80 0.28 1.15 5,977,049.456 634,372.324 0.01 -0.93 700.00 0.20 72.33 700.00 648.80 0.40 1.46 5,977,049.584 634,372.629 0.03 -1.15 800.00 0.27 85.88 800.00 748.80 0.47 1.86 5,977,049.661 634,373.029 0.09 -1.49 900.00 0.72 127.28 899.99 848.79 0.10 2.59 5,977,049.311 634,373.770 0.55 -2.3' 1,000.00 1.78 149.92 999.97 948.77 -1.62 3.87 5,977,047.609 634,375.079 1.15 -4.19 1,100.00 2.43 155.02 1,099.90 1,048.70 -4.89 5.54 5,977,044.375 634,376.811 0.68 -7.09 1,200.00 2.62 155.67 1,199.80 1,148.60 -8.89 7.38 5,977,040.404 634,378.719 0.19 -10.45 1,300.00 2.55 156.25 1,299.70 1,248.50 -13.01 9.22 5,977,036.319 634,380.630 0.07 -13.85 1,400.00 2.52 148.57 1,399.60 1,348.40 -16.92 11.26 5,977,032.445 634,382.742 0.34 -17.36 1,500.00 2.52 139.88 1,499.51 1,448.31 -20.48 13.82 5,977,028.935 634,385.368 0.38 -21.18 1,600.00 2.60 127.95 1,599.41 1,548.21 -23.55 17.03 5,977,025.917 634,388.628 0.54 -25.39 1,700.00 2.83 118.77 1,699.30 1,648.10 -26.14 20.98 5,977,023.405 634,392.626 0.49 -30.06 1,800.00 2.55 118.40 1,799.19 1,747.99 -28.38 25.10 5,977,021.234 634,396.786 0.28 -34.75 1,900.00 2.08 116.65 1,899.10 1,847.90 -30.26 28.68 5,977,019.426 634,400.397 0.48 -38.78 2,000.00 1.72 115.00 1,999.05 1,947.85 -31.70 31.66 5,977,018.032 634,403.405 0.36 -42.10 1121/2017 1: 49:30PM Page 3 COMPASS 5000.1 Build 81D BAfKER by Final SurveNe , y Report UGHES .�,.,,ws„ Company: North America - ALASKA - BP Local Coordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R -28A Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS WS EMI Northing Easgng DLeg V. Sec (usft) (°) (') (usft) (usft) (usft) (usft) (usft) (usft) ('1100usft) (usft) 2,100.00 1.50 113.75 2,099.01 2,047.81 -32.86 34.22 5,977,016.916 634,405.983 0.22 -44.91 2,200.00 1.32 118.70 2,198.98 2,147.78 -33.95 36.43 5,977,015.876 634,408.210 0.22 -47.5 2,300.00 1.20 126.17 2,298.96 2,247.76 -35.12 38.29 5,977,014.738 634,410.086 0.20 -49.54 2,400.00 1.07 129.93 2,398.94 2,347.74 -36.33 39.85 5,977,013.549 634,411.669 0.15 -51.47 2,500.00 0.98 123.92 2,498.92 2,447.72 -37.41 41.27 5,977,012.499 634,413.114 0.14 -53.22 2,600.00 1.00 124.18 2,598.90 2,547.70 -38.38 42.70 5,977,011.557 634,414.562 0.02 -54.92 2,700.00 1.02 125.25 2,698.89 2,647.69 -39.38 44.15 5,977,010.579 634,416.029 0.03 -56.66 2,800.00 0.97 122.87 2,798.87 2,747.67 40.35 45.59 5,977,009.632 634,417.484 0.06 -58.37 2,900.00 0.95 123.00 2,898.86 2,847.66 41.27 47.00 5,977,008.747 634,418.906 0.02 -60.03 3,000.00 0.80 132.25 2,998.85 2,947.65 -42.19 48.21 5,977,007.848 634,420.134 0.21 -61.52 3,100.00 0.60 158.42 3,098.84 3,047.64 -43.14 48.92 5,977,006.905 634,420.860 0.37 -62.57 3,200.00 0.60 160.47 3,198.84 3,147.64 -44.12 49.29 5,977,005.931 634,421.245 0.02 -63.32 3,300.00 0.55 168.63 3,298.83 3,247.63 45.09 49.56 5,977,004.972 634,421.532 0.10 -63.97 3,400.00 0.58 170.78 3,398.83 3,347.63 -46.06 49.73 5,977,004.005 634,421.725 0.04 -64.54 3,500.00 0.38 241.18 3,498.82 3,447.62 -46.72 49.52 5,977,003.342 634,421.528 0.58 -64.63 3,600.00 1.42 335.87 3,598.81 3,547.61 45.75 48.73 5,977,004.299 634,420.713 150 -63.49 3,700.00 1.45 335.32 3,698.78 3,647.58 -43.47 47.69 5,977,006.560 634,419.638 0.03 -61.5 3,800.00 1.35 336.27 3,798.75 3,747.55 -41.24 46.69 5,977,008.770 634,418.596 0.10 -59.7. 3,900.00 1.27 333.13 3,898.73 3,847.53 -39.17 45.71 5,977,010.819 634,417.584 0.11 -57.98 4,000.00 1.23 333.37 3,998.70 3,947.50 -37.22 44.73 5,977,012.749 634,416.567 0.04 -56.27 4,100.00 1.22 334.08 4,098.68 4,047.48 -35.31 43.78 5,977,014.648 634,415.587 0.02 -54.60 4,200.00 1.20 333.53 4,198.66 4,147.46 -33.41 42.85 5,977,016.526 634,414.621 0.02 -52.96 4,300.00 1.07 337.62 4,298.64 4,247.44 -31.61 42.03 5,977,018.311 634,413.767 0.15 -51.45 4,400.00 0.97 338.27 4,398.62 4,347.42 -29.96 41.36 5,977,019.949 634,413.068 0.10 -50.15 4,500.00 0.83 343.83 4,498.61 4,447.41 -28.48 40.85 5,977,021.421 634,412.527 0.16 -49.05 4,600.00 0.35 338.95 4,598.60 4,547.40 -27.50 40.53 5,977,022.396 634,412.198 0.48 -48.36 4,700.00 0.20 0.47 4,698.60 4,647.40 -27.04 40.43 5,977,022.853 634,412.082 0.18 -48.07 11121/2017 1: 49:30PM Page 4 COMPASS 5000.1 Build 81D BP by Final Survey Report B F UGHES 0 n v Company: North America - ALASKA - BP Local Coordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R -28A Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) -. 4,800.00 0.13 8.25 4,798.60 4,747.40 -26.75 40.44 5,977,023.140 634,412.094 0.07 -47.9 4,900.00 0.55 357.78 4,898.60 4,847.40 -26.16 40.44 5,977,023.732 634,412.081 0.42 -47.71 5,000.00 3.70 327.53 4,998.52 4,947.32 -22.96 38.69 5,977,026.903 634,410.273 3.24 44.77 5,100.00 5.47 314.75 5,098.20 5,047.00 -16.88 33.57 5,977,032.888 634,405.048 2.03 -37.56 5,200.00 8.17 296.78 5,197.49 5,146.29 -10.32 23.84 5,977039.271 634,395.201 3.41 -25.97 5,300.00 11.00 291.85 5,296.09 5,244.89 -3.57 8.64 5,977,045.750 634,379.882 2.94 -9.34 5,400.00 13.48 289.00 5,393.81 5,342.61 3.78 -11.24 5,977,052.739 634,359.876 2.55 11.78 5,500.00 16.02 281.80 5,490.51 5,439.31 10.40 -35.77 5,977,058.915 634,335.230 3.13 36.82 5,600.00 18.83 274.55 5,585.93 5,534.73 14.50 -65.38 5,977,062.487 634,305.560 3.55 65.38 5,700.00 22.17 272.15 5,679.58 5,628.38 16.49 -100.33 5,977,063.849 634,270.580 3.44 97.90 5,800.00 25.28 270.12 5,771.12 5,719.92 17.24 -140.55 5,977,063.880 634,230.359 3.22 134.66 5,900.00 28.52 268.38 5,860.29 5,809.09 16.61 -185.77 5,977,062.439 634,185.153 3.33 175.39 6,000.00 30.82 287.05 5,947.17 5,895.97 14.62 -235.23 5,977,059.560 634,135.747 2.39 219.37 6,100.00 31.08 266.70 6,032.94 5,981.74 11.82 -286.58 5,977,055.836 634,084.457 0.32 264.72 6,200.00 31.13 266.82 6,118.56 6,067.36 8.90 -338.16 5,977,051.992 634,032.943 0.08 310.24 6,300.00 31.53 268.50 6,203.98 6,152.78 6.78 -390.11 5,977,048.943 633,981.045 0.96 356.4 6,400.00 32.02 272.10 6,289.00 6,237.80 7.06 -442.74 5,977,048.286 633,928.416 1.96 404.25 6,500.00 32.18 272.48 6,373.71 6,322.51 9.19 -495.84 5,977,049.458 633,875.294 0.26 453.27 6,600.00 32.37 272.65 6,458.26 6,407.06 11.58 -549.19 5,977050.891 633,821.919 0.21 502.62 6,700.00 32.50 272.63 6,542.66 6,491.46 14.05 -602.76 5,977,052.400 633,768.310 0.13 552.23 6,800.00 32.60 272.53 6,626.95 6,575.75 16.47 -656.51 5,977,053.858 633,714.531 0.11 601.96 6,900.00 32.60 272.92 6,711.20 6,660.00 19.03 -710.33 5,977,055.454 633,660.682 0.21 651.82 7,000.00 32.43 273.60 6,795.52 6,744.32 22.09 -763.99 5,977,057.548 633,606.976 0.40 701.75 7,100.00 31.72 274.63 6,880.26 6,829.06 25.89 -816.96 5,977,060.403 633,553.956 0.90 751.36 7,200.00 31.28 275.30 6,965.52 6,914.32 30.41 -869.01 5,977,063.989 633,501.834 0.56 800.44 7,300.00 31.02 276.67 7,051.10 6,999.90 35.80 -920.45 5,977,068.456 633,450.307 0.75 849.34 7,400.00 30.72 277.48 7,136.94 7,085.74 42.12 -971.37 5,977,073.860 633,399.288 0.51 898.16 11/212017 1: 49: 30PM Page 5 COMPASS 50001 Budd 81D �, "I b BP B JER r p Final Survey Report UGHES "" Company: North America - ALASKA - BP Local Co-ordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R -28A Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting Dreg V, Sec (usft) 0 (1 (usft) (usft) (usft) (usft) (usft) (usft) ('1100usft) (usft) 7,500.00 30.85 279.70 7,222.85 7,171.65 49.77 -1,021.97 5,977,080.597 633,348.564 1.14 947.25 7,600.00 30.67 281.97 7,308.78 7,257.58 59.38 -1,072.19 5,977,089.304 633,298.179 1.17 996.8 7,700.00 30.75 282.15 7,394.76 7,343.56 70.05 -1,122.14 5,977,099.076 633,248.057 0.12 1,046.6u 7,800.00 31.48 280.98 7,480.37 7,429.17 80.40 -1,172.76 5,977,108.520 633,197.259 0.95 1,096.86 7,900.00 32.38 280.33 7,565.24 7,514.04 90.18 -1,224.74 5,977,117.361 633,145.120 0.96 1,148.10 8,000.00 33.08 280.85 7,649.37 7,598.17 100.12 -1,277.88 5,977,126.345 633,091.809 0.75 1,200.47 8,100.00 33.42 281.20 7,732.99 7,681.79 110.60 -1,331.70 5,977,135.864 633,037.817 0.39 1,253.67 8,200.00 33.67 280.78 7,816.34 7,765.14 121.14 -1,385.95 5,977,145.423 632,983.395 0.34 1,307.29 8,300.00 33.38 279.42 7,899.70 7,848.50 130.82 -1,440.32 5,977,154.133 632,928.864 0.61 1,360.66 8,400.00 32.18 277.18 7,983.78 7,932.58 138.65 -1,493.88 5,977,161.002 632,875.174 1.71 1,412.51 8,500.00 31.55 278.03 8,068.71 8,017.51 145.64 -1,546.21 5,977,167.046 632,822.735 0.77 1,462.89 8,600.00 31.85 278.77 8,153.79 8,102.59 153.31 -1,598.19 5,977,173.790 632,770.627 0.49 1,513.24 8,700.00 32.17 279.15 8,236.59 8,187.39 161.57 -1,650.55 5,977,181.105 632,718.132 0.38 1,564.19 8,800.00 32.13 279.97 8,323.25 8,272.05 170.41 -1,703.02 5,977,189.000 632,665.513 0.44 1,615.48 8,900.00 31.03 278.98 8,408.44 8,357.24 179.04 -1,754.67 5,977,196.699 632,613.720 1.22 1,665.94 9,000.00 30.37 281.25 8,494.43 8,443.23 187.99 -1,804.93 5,977,204.752 632,563.317 1.33 1,715.27 9,100.00 30.00 283.28 8,580.88 8,529.68 198.67 -1,854.05 5,977,214.543 632,514.011 1.09 1,764.3- 9,200.00 30.37 285.50 8,667.32 8,616.12 211.16 -1,902.75 5,977,226.166 632,465.106 1.18 1,813.7, Tie in to R-28 9,249.00 30.53 286.13 8,709.56 8,658.36 217.93 -1,926.64 5,977,232.504 632,441.098 0.73 1,838.23 KOP-TOWS 9,280.76 34.84 288.00 8,736.29 8,685.09 222.98 -1,943.02 5,977,237.256 632,424.626 13.94 1,655.21 Interpolated Azimuth 9,310.69 45.01 293.00 8,759.21 8,708.01 229.78 -1,960.95 5,977,243.730 632,406.584 35.61 1,874.33 Interpolated Azimuth 9,345.78 55.75 300.12 8,781.57 8,730.37 241.95 -1,985.00 5,977,255.467 632.382.316 34.33 1,901.28 tat good survey 9,382.59 68.47 306.93 8,798.77 8,747.57 259.96 -2,011.98 5,977,272.991 632,355.019 38.20 1,933.34 11/21/2017 1.49: 30PM Page 6 COMPASS 5000.1 Build 81D by Final BP Survey Report �F UGHES E company Company: North Amenca- ALASKA - BP Local Co-ordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KS @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well:. R-28 North Reference: True Wellbore: R -28A Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCP7 Survey MD Inc Azl (azimuth) TVD TVDSS NIS E1W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°7100usft) (usft) 9,410.88 78.26 308.82 8,806.86 8,755.66 276.59 -2,033.35 5,977,289.233 632,333.364 35.19 1,959.7 9,443.54 89.54 311.24 8,810.33 8,759.13 297.45 -2,058.17 5,977,309.641 632,308.177 35.31 1,991.04 9,470.66 98.69 313.80 8,808.38 8,757.18 315.70 -2,078.08 5,977,327.538 632,287.938 35.03 2,016.80 9,500.11 108.07 315.25 8,801.58 8,750.38 335.77 -2,098.49 5,977,347.229 632,267.175 32.21 2,043.78 9,530.50 109.14 313.06 8,791.88 8,740.68 355.83 -2,119.15 5,977,366.917 632,246.159 7.68 2,070.98 9,560.50 111.38 309.74 8,781.49 8,730.29 374.44 -2,140.25 5,977,385.146 632,224.729 12.79 2,097.97 9,590.02 112.40 308.00 8,770.48 8,719.28 391.63 -2,161.58 5,977,401.950 632,203.102 6.47 2,124.56 9,620.19 113.05 305.51 8,758.83 8,707.63 408.28 -2,183.87 5,977,418.198 632,180.516 7.91 2,151.81 9,650.50 112.19 304.59 8,747.17 8,695.97 424.35 -2,206.77 5,977,433.850 532,157.329 3.99 2,179.35 9,680.17 110.78 304.02 8,736.30 8,685.10 439.91 -2,229.58 5,977,448.996 632,134.250 5.08 2,206.60 9,700.26 110.03 302.71 8,729.30 8,678.10 450.26 -2,245.31 5,977,459.067 632,118.342 7.16 2,225.23 9,730.21 108.24 300.60 8,719.48 8,668.28 465.11 -2,269.39 5,977,473.477 632,093.998 B.95 2,253.33 9,760.34 105.58 300.15 8,71072 8.659.52 479.68 -2,294.26 5,977,487.602 632,068.874 8.94 2,282.03 9,790.64 104.23 298.15 8,702.92 8,651.72 493.94 -2,319.83 5,977,501.401 632,043.054 7.78 2,311.23 9,820.13 103.44 294.98 8,695.87 8,644.67 506.75 -2,345.44 5,977,513.741 632,017.222 10.78 2,339.85 9,850.23 103.18 292.21 8,688.94 8,637.74 518.47 -2,372.28 5,977,524.980 631,990.179 9.00 2,369.1 9,880.88 100.98 290.95 8,682.52 8,631.32 529.49 -2,400.15 5,977,535.499 631,962.119 8.23 2,399.04 9,910.31 99.44 288.04 8,677.31 8,626.11 539.15 -2,427.45 5,977,544.670 631,934.652 11.05 2,427.87 9,940.14 97.20 285.43 8,672.99 8,621.79 547.65 -2,455.71 5,977,552.657 631,906.245 11.46 2,457.07 9,970.22 98.19 281.79 8,668.96 8,617.76 554.66 -2,484.67 5,977,559.151 631,877.160 12.44 2,486.29 9,999.79 97.76 278.48 8,664.86 8,613.66 559.81 -2,513.50 5,977,563.785 631,848.251 11.18 2,514.59 10,030.58 95.01 275.80 8,661.43 8,610.23 563.62 -2,543.85 5,977,567.040 631,817.834 12.43 2,543.71 10,060.60 94.21 272.49 8,659.02 8,607.82 565.78 -2,573.69 5,977,568.667 631,787.962 11.31 2,571.67 10,091.72 93.72 268.97 8,656.87 8,605.67 566.17 -2,604.73 5,977,568.506 631,756.925 11.39 2,599.96 10,120.85 92.15 267.12 8,655.37 8,604.17 565.18 -2,633.80 5,977,566.992 631,727.877 8.32 2,625.89 10,150.82 90.77 271.00 8,654.61 8,603.41 564.69 -2,663.75 5,977,565.964 631,697.943 13.74 2,652.83 10,160.57 91.97 276.20 8,653.90 8,602.70 566.56 -2,693.43 5,977,567.298 631,668.245 17.93 2,680.51 11/21/2017 149: 30PM Page 7 COMPASS 5000.1 Build 81D BP BA, ICER by Final Survey Report rj IGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R -28A Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi jazimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (') (') (usft) (usft) (waft) (usft) (usft) Waft) ('/100usft) (usft) 10,210.65 92.80 281.64 8,652.65 8,601.45 571.21 -2,723.11 5,977,571.423 631,638.489 18.28 2,709.38 10,240.63 92.80 287.58 8,651.18 8,599.98 578.76 -2,752.07 5,977,578.452 631,609.398 19.79 2,738.P 10,272.01 93.19 292.90 8,649.54 8,598.34 589.60 -2,781.46 5,977,588.759 631,579.819 16.98 2,770.05 10,300.80 93.19 298.36 8,647.94 8,596.74 602.03 -2,807.37 5,977,600.721 631,553.695 18.94 2,798.77 10,330.81 92.09 303.53 8,646.55 8,595.35 617.44 -2,833.07 5,977,615.667 631,527.724 17.60 2,828.57 10,361.08 90.74 308.42 8,645.81 8,594.61 635.21 -2,857.55 5,977,632.994 631.502.930 16.75 2,858.27 10,390.75 89.14 305.08 8,645.84 8,594.64 652.96 -2,881.32 5,977,650.313 631,478.849 12.48 2,887.31 10,420.98 89.36 300.93 8,646.23 8,595.03 669.42 -2,906.66 5,977,666.317 631,453.216 13.75 2,917.24 10,450.88 88.68 296.97 8,646.74 8,595.54 683.89 -2,932.82 5,977,680.312 631,426.808 13.44 2,947.06 10,480.78 87.60 293.14 8,647.72 8,596.52 696.54 -2,959.88 5,977,692.477 631,399.521 13.30 2,976.94 10,510.66 89.51 289.02 8,648.47 8,597.27 707.28 -2,987.75 5,977,702.716 631,371.471 15.19 3,006.73 10,541.09 89.63 284.90 8,646.70 8,597.50 716.16 -3,016.85 5,977,711.066 631,342.219 13.54 3,036.85 10,570.57 89.14 284.94 8,649.01 8;597.81 723.75 -3,045.33 5,977,718.144 631,313.606 1.67 3,065.88 10,600.48 86.44 283.16 8,650.17 8,598.97 731.00 -3,074.32 5,977,724.878 631,284.493 10.81 3,095.22 10,630.37 87.45 278.92 8,651.76 8,600.56 736.72 -3,103.61 5,977,730.065 631,255.109 14.56 3,124.18 10,660.54 86.99 275.21 8,653.22 8,602.02 740.42 -3,133.51 5,977,733.234 631,225.150 12.38 3,152.84 10,690.65 85.33 271.30 8,655.24 8,604.04 742.13 -3,163.50 5,977,734.402 631,195.140 14.08 3,180.7 10,720.96 87.33 267.18 8,657.18 8,605.98 741.73 -3,193.73 5,977,733.458 631.164.917 15.08 3,207.9, 10,750.78 89.20 269.56 8,658.09 8,606.89 740.88 -3,223.53 5,977,732.077 631,135.148 10.15 3,234.61 10,780.56 89.82 274.86 8,658.34 8,607.14 742.03 -3,253.27 5,977,732.691 631,105.389 17.92 3,262.06 10,810.66 89.57 281.18 8,658.50 8,607.30 746.22 -3,283.06 5,977,736.354 631,075.531 21.01 3,290.83 10,843.51 89.02 287.59 8,658.91 8,607.71 754.38 -3,314.86 5,977,743.938 631,043.591 19.58 3,323.10 10,870.68 88.49 291.74 8,659.50 8,608.30 763.52 -3,340.44 5,977,752.616 631,017.860 15.39 3,350.14 10,900.66 89.63 297.02 8,659.99 8,608.79 775.89 -3,367.73 5,977,764.493 630,990.352 18.01 3,380.10 10,930.59 90.28 300.36 8,660.01 8,608.81 790.25 -3,393.98 5,977,778.386 630,963.849 11.37 3,409.97 10,960.34 88.56 303.67 8,660.31 8,609.11 806.02 -3,419.20 5,977,793.698 630,938.353 12.54 3,439.49 10,990.54 91.01 308.11 8,660.43 8,609.23 823.72 -3,443.66 5,977,810.953 630,913.584 16.79 3,469.13 11/212017 1:49:30PM Page 8 COMPASS 5000.1 Build 81D BP BAT(ER by Final Survey Report UGHES Company: North America -ALASKA - BP Local Coordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well R-28 North Reference: True Wellbore: R -28A Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) 11,020.84 94.18 313.01 8,659.05 8,607.85 843.39 -3,466.65 5,977,830.209 630,890.249 19.25 11,050.74 94.45 309.15 8,656.80 8,605.60 862.98 -3,489.12 5,977,849.390 630,867.433 12.90 11,080.74 94.49 305.43 8,654.46 8,603.26 881.10 -3,512.91 5,977,867.076 630,843.324 12.36 11,110.52 94.64 301.53 8,652.09 8,600.89 897.47 -3,537.66 5,977,883.001 630,818.281 13.06 11,139.65 94.40 298.33 8,649.80 8,598.60 911.96 -3,562.82 5,977,897.034 630,792.864 10.98 11,170.70 92.98 294.16 8,647.80 8,596.60 925.66 -3,590.61 5,977,910.230 630,764.840 14.16 11,200.77 93.81 290.74 8,646.02 8,594.82 937.12 -3,618.35 5,977,921.192 630,736.904 11.68 11,230.54 94.43 285.18 8,643.88 8,592.68 946.27 -3,646.58 5,977,929.836 630,708.512 18.74 11,260.38 95.99 282.57 8,641.17 8,589.97 953.40 -3,675.43 5,977,936.444 630,679.545 10.16 11,290.63 94.24 278.69 8,638.47 8,587.27 958.95 -3,705.03 5,977,941.467 630,649.847 14.02 11,320.55 94.18 275.38 8,636.27 8,585.07 962.61 -3,734.64 5,977,944.589 630,620.178 11.03 11,350.69 92.43 27268 8,634.53 8,583.33 966.03 -3,764.54 5,977,947.475 630,590.232 9.58 11,380.85 93.69 282.87 8,632.92 8,581.72 971.40 -3,79416 5,977,952.312 630,560.520 17.68 11,41D.55 93.44 288.74 8,631.07 8,579.87 979.47 -3,822.67 5,977,959.869 630,531.873 19.74 11,440.32 89.69 291.59 8,630.26 6,579.06 989.72 -3,850.59 5,977,969.622 630,503.769 15.82 11,480.49 90.43 297.18 8,630.22 8,579.02 1,006.30 -3,887.17 5,977,985.541 630,466.909 14.04 11,510.60 89.45 298.23 8,630.25 8,579.05 1,020.30 -3,913.82 5,977,999.058 630,440.007 4.77 11,540.70 87.36 300.23 8,631.09 8,579.89 1,034.99 -3,940.08 5,978,013.275 630,413.496 9.61 11,570.53 85.54 303.62 8,632.94 8,581.74 1,050.73 -3,965.34 5,978,028.558 63D,387.955 12.88 11,600.64 86.44 309.08 8,635.04 8,583.84 1,068.53 -3,989.52 5,978,045.917 630,363.460 18.33 11,640.64 86.96 312.60 8,637.35 8,586.15 1,094.64 -4,019.73 5,978,071.480 630,332.793 8.88 11,670.61 87.33 306.89 8,638.84 8,587.64 1,113.77 -4,042.74 5,978,090.193 630,309.449 19.07 11,700.77 87.45 303.40 8,640.21 8,589.01 1,131.11 -4,067.37 5,978,107.088 630,284.512 11.57 11,730.75 86.96 300.17 0,641.68 8,590.48 1,146.88 -4,092.82 5,978,122.399 630,258.785 10.88 11,760.64 85.14 296.01 8,643.74 8,592.54 1,160.92 4,119.12 5,978,135.962 630,232.241 15.16 11,800.68 84.00 291.75 8,647.53 8,596.33 1,177.05 -4,155.56 5,978,151.438 630,195.522 10.97 11,840.82 85.91 287.77 8,651.06 8,599.86 1,190.56 -4,193.18 5,978,164.273 630,157.668 10.96 V. Sec (usft( 3,498.2 3,526.92 3,556.14 3,585.50 3,614.43 3,645.40 3,675.38 3,704.84 3,733.99 3,763.17 3,791.55 3,820.09 3,849.21 3,878.45 3,948.: 3,978.33 4,008.33 4,037.88 4,067.32 4,105.73 4,134.66 4,164.32 4,194.05 4,223.81 4,263.66 4,303.46 11212017 1:49: 30PM Page 9 COMPASS 5000.1 Build 81D BP BA, ICER r by Final Survey Report UGHEs Company: North America - ALASKA - BP Local Coordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Site: PB R Pad MD Reference: KB @ 51.20usft (ORIG KELLY BUSHING) Well: R-28 North Reference: True Wellbore: R -28A Survey Calculation Method: Minimum Curvature Design: R -28A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E1W Northing Easing DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 11,870.68 85.97 287.65 8,653.17 8,601.97 1,199.62 4,221.55 5,978,172.823 630,129.139 0.45 4,333.01 11,900.72 89.82 286.44 8,654.28 8,603.08 1,208.42 4,250.25 5,978,181.104 630,100.293 13.43 4,362.: 11,930.76 94.43 289.95 8,653.16 8,601.96 1,217.79 -4,278.75 5,978,189.959 630,071.625 19.28 4,392.53 11,960.60 92.89 295.53 8,651.25 8,600.05 1,229.30 -4,306.21 5,978,200.972 630,043.973 19.36 4,422.27 11,977.75 92.00 298.07 8,650.52 8,599.32 1,237.02 -4,321.50 5,978,208.421 630,028.546 15.68 4,439.40 12,010.00 92.00 298.07 8,649.40 8,598.20 1,252.19 4,349.94 5,978,223.073 629,999.842 0.00 4,471.58 Projection to TD Design Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +FJ -W (usft) (usft) (usft) (usft) Comment 9,200.00 8,667.32 211.16 -1,902.75 Tie in to R-28 9,249.00 8,709.56 217.93 -1,926.64 KOP-TOWS 9,280.76 8,736.29 222.98 -1,943.02 Interpolated Azimuth 9,310.69 8,759.21 229.78 -1,960.95 Interpolated Azimuth 9,345.78 8,781.57 241.95 -1,985.00 1st good survey 12,010.00 8,649.40 1,252.19 4,349.94 Projection to TD Prepared By: Jose Vazquez - Tech Support Engineer - BHGE 11!212017 1:49:30PM Page 10 COMPASS 5000.1 Build 810 � AI"VI ) Loepp, Victoria T (DOA) V From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Monday, November 20, 2017 2:03 PM To: Loepp, Victoria T (DOA) Cc: Thompson, Ryan Subject: Withdraw sundry requests for 04-21A (PTD #217-117) and R -28A (PTD #217-019) 31} 44S 31 Li41e Follow Up Flag: Follow up Flag Status: Flagged Victoria, Please withdraw / cancel sundry request for 04-21A (PTD #217-117) and R -28A (PTD #217-019). These were submitted as post drilling perforations by our Klondike wellwork platform. Both wells had perforations shot with the rig, so these are no longer necessary. Please let me know if you have any questions. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 vrr: a BP Exploration AlaskaJ900 E. Benson Blvd.lRoom: 788DIAnchorage, AK RBCsda LL-- G-, 0 0 2017 ( STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIS A APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend ❑ Perforate 0. Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other Klondike W WP 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development 0 Exp 5. Permit to Drill Number: 217-019 ' S. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Siratigrephic ❑ Service ❑ 6. API Number: 50-029.22273.01-00 7. If perforating: B. Well Name and N `f�EC What Regulation or Conservation Order governs well spacing in this pool? E I V Will planned perforations require a spacing exception? Yes ❑ No 0 R -28A E 9. Property Designation (Lease Number): I- 1 p 10. Field/Pools: SCP 1 9 2017 ADL 028279 ' PRUDHOE BAY, PRUDHOE OIL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(ft) : Effective Depth MD: Effective Depth ND: MPSP (psi). (M D): Junk (MD): -11986'-8587'ss -11900'-8586ss 2482 ' IN None None Casing Length Size MD TVO Burst Collapse Structural Conductor 80 20" 37-117 37 Surface 2986 10.3/4" 36-3022 36-0021 5210 2480 Intermediate 9149 7-5/8" 32-9181 -8651 6890/8180 4790 / 5120 Liner 332 5-1/2" 8916-924 4 2 6709 7740 1 6280 Liner -3066 3 -1/2"x3 -1/4"x2-7/8" -8920--11986 -8374'ss--8587'ss Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Tubing Grade: Tubing MD Ili None li�Size: 4-1/2" 13Cr80 30-8799 Packers and SSSV Type: 4-1/2" Baker S-3 Packer ckers SSSV MD (ft) and TVD (ft): 8678/8220 4-1/2" Baker SABL Packer 8839/8356 Q. Attachments: Proposal Summary 0 Wellbore Schema 3.1 Class after proposed work: Detailed Operations Program ❑ BOP S c xpi story ❑ Stretigraphic ❑ Development 0 Service ❑ 14. Estimated Date for Commencing Operations: November 1, 15. Well Status after proposed work: Oil 0 WINJ ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 77 Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the proced# approved herein will not Contact Name: Thompson, Ryan be deviated from without prior written approval. Contact Email: RYAN.THOMPSON@bp.com Authorized Name: Thompson, Ryan Contact Phone: -1907 564 4535 Authorized Title: Interventions En i Authorized Signature: A, Date: COMMISSION USE ONLY Conditions of approval: Notify Commission so at a representative may witness Sundry Number: 4(" Ice Plug Integrity ❑ BOP Te ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Post Initial Injection MIT Req'd? es ❑ No ❑ Spacing Exception Required? Yes ❑ No ❑ Subsequent Form Required: APPROVED BYTHE Approved by: COMMISSIONER COMMISSION Date: ORIGINAL Form 10403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. RSDfAS L- Li,' 1 12017 Submit Form and Attachments in Duplicate Sundry Request for Extended Length Perforating utilizing the Well Work Platform Well: R-28 Date: 9/18/2017 Engineers: Kirsten Schultz 907-564-5105 Ryan Thompson: 907-564-4535 MASP: 2482 psi Well Type: Producer Estimated Start date: November 2017 History: R-28 is a Rotary Zone 4A and 4B horizontal sidetrack which was initially put on production in September 1992. A RWO was performed in November 2009 to repair a surface casing leak and the 7%' production casing was replaced with new casing with premium connections, which was cemented to surface. The 4%" tubing was also replaced with chrome tubing with premium connections. A CTD sidetrack is planned for November 2017. Scope of Work: The objective of this intervention is to utilize Service Coil and the Well Work Platform to add 1500' of perforations post rig after CTD drills, completes, and cements the well. Proposed WWP Procedure: • MIRU WWP, BOPE and support equipment • MIRU CTU • Test BOPE with four preventers configured top down (annular, blind shears, 1.75" pipe/slips, mud cross, 2-3/8" x 3-1/2" VBR's, 1.75" pipe/slips). Test the blind shears, VBR's, and pipe slips to 3500 psi and the annular to 2500 psi. Drift and tie in run with GR/CCL • Perforate -1500ft in new completion • RDMO CTU and WWP Planned Wellbore Configuration after Sidetrack and Completion ID -low Minimum ID = 3.726" @ 8814' 4-112" PARKER SWM NIPPLE 0152 IOF. 0 - 3 856• 3956' 4-682' PeWORKTDN SUAMRY REFLOO: SV r.BHCS ON0773192 ANXEAT TOPPEIF: 3VO92W 6 I am -9m I O I 070=11 1J -OW R -28A PROPOSED SAFETY ROM: —CWWME TIMMO t UWr" St ho I TVO OEV TYPE VLVDR I PORT (SAYE 4 3500 3500 1 103G2 OOW 9K 18 1201118 3 5830 9802 28 KBFi SO W 20 1201!18 2 7570 T266 31 I®62 DN F9( 0 1201118 1 8562 8721 32 RfiQ faf! 9K 0 1201118 rw f K _4 X YLLOMW WfR-:.)6250_ OAIE f1EV BY ICd1YENT8 GAIE - REV BY YERTS 0711171112 IONGUAL 0owtl71OIIM nfw611 a6 Toro 61m aF6ETluaf 0/16187 JMO WET PROPOSED PRUGHOE BAY VNR WELL R-264- mFVAWT W AFRW. SO{QP7227301 SEC V. TIM. RIN 504In 67111 FV/L W f3pen66n IA16a111 BOP rig up Hvdraulicall4 Actuated valve Choke Line {It 11 cl- 1-3 Platform Floor Ri.er to platform floor Annular BlindlShear Coil Pipelslip *U2� Kill Linc Variable Bore Ram Coil PipelSlip T x 7 Spool as needed Swab Valve Flow Cross SSV Master Valve THA Tubing Head Ground Level Loepp, Victoria T (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Monday, November 20, 2017 2:03 PM To: Loepp, Victoria T (DOA) �� 6 Cc: Thompson, Ryan /3) Subject: Withdraw sundry requests for 04-21A (PTD #217-117) an R -28A (PTD #217-019) Follow Up Flag: Follow up / Flag Status: Flagged Victoria, Please withdraw / cancel sundry request for 04-21A (PTD #217-117) and R -28A (PTD #217-019). These were submitted as post drilling perforations by our Klondike wellwork platform. Both wells had perforations shot with the rig, so these are no longer necessary. Please let me know if you have any questions. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 ----------------------------------------------------------------------------------------- w, .4ew A BP Exploration Alaska1900 E. Benson Blvd.lRoom: 788DIAnchorage, AK THE STATE °fKA11. --- GOVERNOR BILL WALKER John Egbejimba Drilling Supervisor BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.a[aska.gov Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU R -28A BP Exploration (Alaska), Inc. Permit to Drill Number: 217-019 Surface Location: 585' FSL, 718' FWL, Sec. 32, T12N, RUE, UM Bottomhole Location: 1845' FSL, 3607' FEL, Sec. 31, TI 2N, RI 3E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy P. Foerster Chair DATED this % day of March, 2017. STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMIS? PERMIT TO DRILL 20 AAC 25.005 la. Type of Work:1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1c. Specify if well is proposed for: Drill El ❑ Strafigraphic Test 11 Development -Oil IZ ' Service -Winj 11 Single Zone ®' Coalbed Gas ❑ GaSHydrates❑ Redrill M' Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone 11 Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket ®- Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 295705380. PBU R -29A 3 Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchorage. AK 99519-6612 MD: 11986' . TVD: 8587'ss PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well Governmental Section): ( ) 7. Properly Designation (Lease Number): ADL 028279 8. Land Use Permit: 13. Approximate spud date: Surface: 5a5' FSL, 718' FWL, Sec. 32, T12N, R13E, UM Tap Of Productive Horizon: 795' FSL, 1181' FEL, Sec. 31, T12N, R13E, UM 77-028 June 1, 2017 ' 9. Acres in Property: 2459 14. Distance to Nearest Property: Total Depth: 184T FSL, 3607' FEL, Sec. 31, T12N, R13E, UM 14050 4b, Location of Wall (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 51.2 • feet 15. Distance to Nearest Well Open to Same Pool: Surface: x- 634371 y- 5977049 Zone - ASP 4 GL Elevation above MSL: 9.2 •feet100 16. Deviated wells: Kickoff Depth: 9250 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 110 degrees Downhole: 3350 ' Surface: 2482 ' 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casin Weight Grade COu lin Len th MD TVD TVD (includingstage data 4-1/4" 3-1/2"x3-1/4" 9.2#/6.4# 13Cr85 STLITCII 3066' 8920' 8374'ss 11986' 8587'ss 168 sx Class'( 1 x2-7/8" /6.2# +' VE 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) 3 Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 1 9836 9213 9395 9395 8835 None Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20" 260 sx Arctic Set (Approx.) 37-116 37-116 Surface 2986 10-3/4- 2182 cu ft AS Ill, 400 cu ft Class'G'. 44 sx Class'G' 36-3022 36-3021 Intermediate 9149 7s/3" 1250 cu ft Class'G', 673 sx Class'G' 32-9181 32-8651 Production Liner 920 5-1/2" 202 cu ft Class'G' 8916-9836 8422-9213 Perforation Depth MD (ft): 9200-9414 Perforation Depth TVD (ft): 8667-8851 20. Attachments Property Plat ❑ BOP Sketch IZ Drilling Program 51 Time v. Depth Plot ❑ Shallow Hazerd Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program m 20 AAC 25.050 requirements IZ 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Leemhuis, Jacob from without prior written approval. Email Jacob.Leemhuis@bp.cem Printed Name John Egbejimba Title Drilling Supervisor Signature Phone +1907 564 4139 Date >0 Commission Use Only Permit to Drill / Number. Z (�' f 9 API Number: 50- 029-22273-01-00 Permit Approval Date: Sae cover letter for other ( requirements: not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: 1 Conditions of approval : If box is checked, well m 1 7ayy PC —Vi -sr Samples req'd: Yes ❑/ No V Mud log req'd: Yes ❑/ No (H/ Other: � � Pgt �^ C%�MtC H2S measures Yes 6d No ❑/ Directional svy req'd: Yes 13 No ❑ Y� AtrmvEP PER Ase Spacing/%9.�1r�\ption req'tl: Vas ❑ No fd nclination-only svy req'd: Yes ❑ No !H 25' �Z'I.NJ Post initial injection MIT req'd: Yes ❑ No ❑ APPROVED BY Approved by: ; COMMISSIONER THE COMMISSION Date.9 - 2—� ORIGINAL Farm 10401 Revised 112015 This permit is valid for 24 months from the date of ap roval (20 AAC 25.005(g)) Submit Form and Attachments in Duplicate t�)�v. llz'L 101 To: Alaska Oil & Gas Conservation Commission MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,461 psi). ✓ 2. Mill 3.80" window and 10' of rathole. 3. N'I 4. From: Jacob Leemhuis CTD Engineer : se,♦�� �� Pump primary cement job: 34.8 bbls, 15.3 ppg Class G, TOC at -8,920' MD. ✓ 7. Perform cleanout run if needed 8. Date: February 13, 2017 Perforate -1,500' 10. Re: R -28A Permit to Drill Request Close in tree, RDMO. Approval is requested for a permit to drill a CTD sidetrack from well R -28A by the Nabors CDR2 Drilling rig on or around June 1, 2017. The R -28A sidetrack will be a single string exit from the existing 5%" liner. A 4%" x 5'/" Delta Whipstock will be set above a PosiSet plug, which will allow isolation from the Ivishak perforations. R -28A will kickoff from 5'/:" liner drilling a horizontal well to provide offtake in the target fault block across the Sag River sands. Well design involves kicking off a 4%" x 5%" Delta whipstock, drilling build section with 35 DLS, drilling lateral with 12 DLS geosteering in the Sag River, run 3%" x 3'/e" x 2%" 13Cr-85 production liner, cemented and perforated. Rig Work (scheduled to begin June 1, 2017) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,461 psi). ✓ 2. Mill 3.80" window and 10' of rathole. 3. Drill Build: 4.25" OH, -234'(35 deg DLS planned). 4. Drill Lateral: 4.25" OH, 2,482' 12 deg DLS planned). 5. Run 3'/" x 3%" x 2%" 13Cr-85 liner leaving TOL at -8,920' MD. 6. Pump primary cement job: 34.8 bbls, 15.3 ppg Class G, TOC at -8,920' MD. ✓ 7. Perform cleanout run if needed 8. Perform liner lap test*. ✓ 9. Perforate -1,500' 10. Freeze protect well to a min 2,000' TVDss. 11. Close in tree, RDMO. *Approved alternative plug placement per 20 AAC 25.112 (i) ✓ Post -Rig Work 1. V Pull TWC. Tree work as necessary 2. S Set LTP (if necessary) 3. F Pressure Test LTP (if necessary) 4. T ASRC flowback 5. F SIT *Approved alternative plug placement per 20 AAC 25.112 (i) '; .7>eY 31'1- 0-1 b Mud Program: • Milling/drilling: 8.4 - 9.5 ppg solids free fluid for milling window and drilling (8.4 ppg provides 536 psi over -balance) Disposal: • All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids > 1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through X" screen must go to GNI. • Fluids with pH > 11 must go to GNI. Hole Size: 0 4.25" from 9,250' MD to 11,986' MD Liner Program: • 3-1/2" 9.2# 13Cr-85, STL Solid from 8,920' MD to 9,238' MD • 3-1/4" 6.4# 13Cr-85, TCII Solid from 9,238' MD to "'9,850' MD • 2-7/8" 6.2# 13Cr-85, STL Solid from 9,850' MD to 11,986' MD • 34.8 bbls of 15.3 ppg cement will be used to cement the liner in place. (TOC at 8,920' MD) - • The primary barrier for this operation: minimum EMW of 8.4 ppg (provides 536 psi overbalance) • A cross over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams, and the CT packoff will be pressure tested to 250 psi low and 3,500 psi high. • The annular preventer will be tested to 250 psi low and 3,500 psi high. ✓ Directional: • See attached directional plan. Maximum planned hole angle is 110°. • Magnetic and inclination surveys will betaken every 30 ft. No gyro will be run. • Distance to nearest property line: 14,050' • Distance to nearest well within pool: 100' TVD (R-29A Ivishak horizontal production hole crosses 100' TVD below R-28A Sag horizontal section) -" Logging: • MWD directional, gamma ray, and resistivity will be run over all of the open hole section. Perforating: • HES MaxForce 2.00", 6 spf, perf guns, 1" CSH work string, & 2-1/16" CSH • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures: • R-14 Fails Major Risk for R-28A WP08 Anti-Collision. R-14 has been P&A'd due to sidetrack and has been minor risked. • R-14A Fails Major Risk for R-28A WP08 Anti-Collision. R-14A has been P&A'd due to sidetrack and has been minor risked. • R-29A Fails Major Risk for R-28A WPO8 Anti-Collision. R-29A will be shut-in and minor risked. Hazards: • R-Pad is considered a H2S pad • Most recent 112S level on R-Pad was at R-29A with 100 ppm recorded on 8/21/2016 • Lost circulation potential in R-28A is considered to be med (2 mapped fault in target location) Reservoir Pressure: / • The reservoir pressure on R-28A is expected to be 3,350 psi at 8,900' TVDss. (7.24 ppg EMW) ✓ • Maximum expected surface pressure with a full column of gas (0.10 psi/ft) to surface is 2,461 psi. • An EMW of 8.4 ppg will provide a 536 psi overbalance to the reservoir. Managed Pressure Drilling: • MPD techniques may be used to improve hole stability. • An automatic choke will maintain a target ECD at the window for the duration of drilling to improve hole stability. • A pressure schedule will be used for tripping In/Out of the hole. The purpose of the pressure schedule for tripping is to maintain the same bottom hole pressure at the window by applying surface pressure via the choke. • At all times, drilling fluid weight will be greater than equivalent pore pressure. MPD is only being used for hole stability. Jacob Leemhuis CC: Well File CTD Engineer Joe Lastufka Jacob.Leemhuis@bp.com 907-564-4989 TREE = CNV WELLHEAD= FMC ACTUATOR= BAK92 NRAL KB. E.E _ 51.7 BF. E.EV = 20' KOP= 5200' kbx Angie = 34'@ 8200' tum MD 9414' 09+22/93 BK = 10.314" CSO PATCH{ tum 7VD= BOW SSI 45.5#, L-80 ETC, D =10.05' 5/8' CSG PATCH, 29.7#, L-80 BTC, ID= 6.875' — 10.3/4' CSG, 45.5#, NT -80 BTC, D = 9.953- — Minimum ID = 3.726" @ 8914' 4-1/2" PARKER SWN NIPPLE 4-1/2 TBG, 12.8#,13CR-80 TCJ .0152bof. ID 3.959' LNR D = 3.958' 8777' 1 8782' 1 PERFORATION SLM,MRY REFLOG: SWSBHCS ON 07/3/92 ANGLE AT TOP PERF: 30-@9200- Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz SEDT SOz 3-3/8" 6 9200-9237 O 09+22/93 BK 2-7/8' 6 9208 -9233 O 07/03/11 26 3-3/8" 6 9322 -9362 O 0922193 2 3-3/8" 4 9324- 9354 O 09r23/92 BK 3-318" 4 9360 - 9396 O 09123192 32 3-318' 4 9404- 9414 C 09123192 5-1/2' LW 17#, NT13CR-80 FL4S, .0232 W, D = 4.892' R-28 I -FETY NOTES: —CHROME TUBING & LIMER ' GAS LFA T MANTRS ST MD I ND I DEV I TYPE I VLV LATCH FORT DATE 4 3590 3589 1 KBG2 DOW BK 16 05/16/14 3 58 34 5802 26 KBG2 DOME SK 16 05/16/14 2 7574 7286 31 KEW DOME BK 16 05/16/14 1 8562 8121 32 KBG2 SO BK 22 05/16/14 8870' I—j 7-98"x 4-1/2' BKR S-3 PKI 8704' 4-1/2 X NP PLE D = 3.813" ' x 4-712' INOIEOVERSHC x 4-1/2" BKR SABL A PROAEd PW D = 3.875 PKR SWS W. D=3.813' 8914' H4-18'FKRSWNN?D=3.725- x 8825'-14-W- WLEG, D= 3.869" 8811' HEIM TT LOGGED 07/19/92 DATE REV BY COKOAN 5 DATE I REV BY I OOMbBJiS 07/07192 ORIGINAL COMPLETION 0&191141 BSEJMD GLV aO (05/16114) 11/06109 Dig RWO 07/10/14 RCT/JM7 SET PIC RAIG(07/09/14) 08/16111 JKLY PJC CARBOLRE (FRAC} (8113/11) 11/02/15 SWC/J RA -LED ED PX PLUS (1089/15) 08/17111 DLW/ RJC GLV C/O (08116/11) 0882/11 PBS/PJC SAND aFAN OLIT(8119/11) 05124/13 JJL/JMD FOO/CMR&SAND(0580/13) PRUDHDE BAY LIMIT WELL R-28 PERMT No:'1920580 API No: 50.029-22273-00 SEF 32, T12K R13E 585' FSL & 718' FWL BP EKplora8on(AWka) JRm= WELLHEAD= FMC ACTUATOR= 8920' NML K8. ELE 512' BEEEV= 20' KOP= 5200' Max Allgle = _` @ ' Datum MD= ' Datum ND= 8800'SS 10.3/4" CSO PATCH, --i-5r 45.5#, L-80 BTC, D =10.05' 7-51W CSG PATCH. 29.79, L-80 BTC, D = 6.675' 2908 10-314" CSG, 45.5#, L-80 BTC, ID = 9.950' 3022 Minimum ID = 3.726" @ 8914' 4-1/2" PARKER SWN NIPPLE 4-1/2' TBG, 12.6#, 13CR$0 TCtl $777' .0152 bpf, D = 3.958' TOP OF 5-12-LNR —j 8916' OF 3-1/2' X 31/4" X 2-7/9" LNR 89.20• TOP OF CEMENT ()IX/XX/XX) 8920' 4-1/2" TBG, 12.6.# 13CR FOX, 8925' .0152 bpf, D= 3.958' 5-1/2' DEFTA WHIPSTOCK Ci / ) I-1 9248- 5-1/2' LNR 17#, NT13CR-60 FL4S, —9248' .0232 bpf, D = 4.892' ORIGINAL COMPLETION #, L-00 STL, .0097 bpf, ID = 2.992' 9238' 7574 18562 PERFORATION SLAaTWRY REF LOG: SWSSBH(S ON 07/3/92 ANGLEAT TOP P9iF: 30" @ 9200' Note: Refer to Production DB for historical pert data SIZE SPF NfE1NAL OpnlSgz SHOT SOZ 3 318"r 6 9200-9237 O 09/21/93 2-7/8" 6 9208-9233 O 07!03/11 bpf, ID PBTD — bpf, ID = R -28A PROPOSED . FETY NOTES: '"'CHROM E TUBING 8 LINER - 14.1/2" X NIPPLE D = 3.813" I x 4-12' BKRSABL 4 PRBdEFt PW D= 3.875" FKR SWS TAP, D = 3.813' PKR SWN NP D = 3 725' -518" x 5-12" LPR HGR D 70" DEPLOYMENT SLV, ID- .i7 D-.17 1A1 MILLOIfi WINDOW (R -28A) 9250'-_' 923w - 31/2' X3-1/4' 7D, ID=x.xxx' 131/4" X2-7/8" XO. D = 2.377" 1 DATE 834� COMMENTS DATE REV BY COMMENTS 0710792 ORIGINAL COMPLETION 1198109 2 7574 18562 CTD SIDETRACK (R -28A] 01/03/17 JMD 1 87211 32 KBG2 DMY BK 0 12A 8638' 4-1/2" X NFFLE K)=&813" 86� 7-59' x 4-1/2" BKR S-3 PKR D= 3.975- x 4-12' BKRSABL 4 PRBdEFt PW D= 3.875" FKR SWS TAP, D = 3.813' PKR SWN NP D = 3 725' -518" x 5-12" LPR HGR D 70" DEPLOYMENT SLV, ID- .i7 D-.17 1A1 MILLOIfi WINDOW (R -28A) 9250'-_' 923w - 31/2' X3-1/4' 7D, ID=x.xxx' 131/4" X2-7/8" XO. D = 2.377" 1 DATE REV BY COMMENTS DATE REV BY COMMENTS 0710792 ORIGINAL COMPLETION 1198109 D78 RWO CTD SIDETRACK (R -28A] 01/03/17 JMD BUILT PROPOSED 01/28/17 JCL/TLH REV 1 PROPOSED PRUDHOE BAY UNIT WELL: R-2aA PERMIT No: _ API No: 50-029-22273-01 SEC 32, T1 2N, R13E. 585' FSL & 71W FWL SP Explora8on(Alaska) bp"00W North America - ALASKA - BP Prudhoe Bay PB R Pad R-28 R -28A FafToIWZIK'-T-,X WOOF BP Coil Tubing Report 06 February, 2017 rias BAKER HUGHES : by Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB R Pad Well: R-28 Wellbore: R -28A Design: R -28A WP08 BP PB R Pad, TR -12-13 naw BP Coil Tubing Report OMER Northing: INCHES Latitude: Local Coordinate Reference: Well R-28 Map Easting: TVD Reference: Mean Sea Level Longitude: 148° 53'4.328 W MD Reference: ORIG KELLY BUSHING @ 51.20usft (DOYON 16) Slot Radius: North Reference: r True Grid Convergence: 1.05` Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 tject Prudhoe Bay, GPB, PRUDHOE BAY p System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level o Datum: NAD27.OGP-Usa AK [4267'15864] Using Well Reference Point p Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734.1586• - Using geodetic scale factor Site PB R Pad, TR -12-13 Site Position: Northing: 5,975,706.220 usft Latitude: 70° 20'29.100 N From: Map Easting: 637,446.420 usft Longitude: 148° 53'4.328 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.05` Well R -28,R -28 -Well Position +NI -5 0.00 usft Northing: 5,977,049.160 usft Latitude: 70° 20'42.855 N +FJ -W 0.00 usft Easting: 834,371.180 usft Longitude: 148'54'33.451 W Position Uncertainty 0.00 usft Wellhead Elevation: 19.84 usft - Ground Level: 19.20 usft Wellbore R -28A --_-� Magnetics Model Name Sample Date Declination Dip Angle Field Strength 1.1 11 InTI BGGM2016 8/1/2017 17.72 81.01 57,551 Design R -28A WP08 ll Audit Notes: Version: Phase: PLAN Tie On Depth: 9,100.00 Vertical Section: Depth From (TVD) +NI -S +E/ -W Direction (usft) (usft) (usft) (°) -1984 0.00 0.00 295.00 2162017 12:34:55PM Page 2 COMPASS 5000.1 Build 81B BP RAW b ••_ S !J y BP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA - BP Local Cororcinate Reference: Well R-28 Project Prudhoe Bay TVD Reference: Mean Sea Level Site: PB R Pad MD Reference: ORIG KELLY BUSHING @ 51.20usg (DOYON 16) Well: R-28 North Reference: Two Wellbore: R -25A Survey Calculation Method: Minimum Curvature Design: R -28A WP08 Database: EDM RSK- Alaska PROD -ANCPI Survey Tool Program Data 2/6/2017 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,100.00 1: Schlumberger GCT muhishot(R-28) GCT -MS Schlumberger GCT muhishot 9.100.00 11,986.00 R -28A WP08(R-28A) MWD MWD -Standard Planned Survey MD Inc Azl TVDSS NIS ENV Northing Easting DLeg V. Sec TFace (usft) 1°) (9 (usft) (ustt) (usfy (usft) lusft) 1°1100usft) (usft) 1"I 9,100.00 30.00 283.28 8,529.68 198.87 -1,854.05 5,977,214.543 632,514.011 0.00 1,764.30 0.00 R-28 Actual Survey 9,200.00 30.37 285.50 8,616.12 211.16 -1,902.75 5,977,226A66 632,465.106 1.18 1,813.72 72.62 R-28 Actual Survey TIP 9,250.00 30.53 286.14 8,659.22 218.07 -1,927.12 5,977,232.636 632,440.609 0.72 1,838.73 64.02 KOP 9,270.00 32.10 287.83 8,676.31 221.11 -1,937.06 5,977,235.497 632,430.618 9.00 1,849.02 30.00 End 9deg/100ft 9,300.00 41.49 295.74 8,700.32 227.89 -1,953.65 5,977,241.973 632,413.914 35.00 1,866.92 30.00 9,320.00 47.97 299.51 8,714.52 234.43 -1,966.10 5,977,248.293 632,401.353 35.00 1,880.96 23.64 5 9,400.00 74.72 309.09 8,752.60 274.20 -2,023.04 5,977,287.025 632,343.711 35.00 1,949.38 20.00 9,500.00 108.54 318.26 8,749.79 342.11 -2,094.26 5,977,353.646 632,271'.288 35.00 2,042.63 15.27 9,504.33 110.00 318.69 8,748.36 345.17 -2,096.97 5,977,356.658 632,268.522 35.00 2,046.38 15.54 End 35deg/100ft 9,600.00 110.00 306.48 8,715.64 405.89 -2,163.04 5,977,416.177 632,201.386 12.00 2,131.91 -67.90 9,700.00 110.00 293.71 8,681.44 452.90 -2,244.17 5,977,461.728 632,119.426 12.00 2,225.32 -87.81 9,709.33 110.00 292.51 8,678.25 456.35 -2,252.24 5,977,465.025 632,111.300 12.00 2,234.08 -89.80 7 9,800.00 110.00 280.94 8,647.24 480.82 -2,333.70 5,977,488.037 632,029.425 12.00 2,318.25 -88.01 9,869.33 110.00 272.08 8,623.52 488.20 -2,398.36 5,977,494.255 631,964.641 12.00 2,379.98 -88.48' 8 9,900.00 106.54 273.39 8,613.91 489.60 -2,427.45 5,977,495.128 631,935.540 12.00 2,406.93 160.00 2/6/2017 12: 34 55P Page 3 COMPASS 5000.1 Build 81B bp Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB R Pad Well: R-28 Wellbore: R -28A Design: R -28A WP08 Planned Survey I MD (usft) 10,000.00 10,045.77 9 10,100.00 10,200.00 10,28&0D 10 10,300.00 10,400.00 10,500.00 10,566.00 11 10,600.00 10,700.00 10,800.00 10,846.00 12 10,900.00 11,000.00 11,100.00 11,126.00 13 11,200.00 11,300.00 11,400.00 11,406.00 14 11,500.00 BP Azi TVDSS FS Fag BP Coil Tubing Report Northing 5,977,607.914 BAKER 631,561.685 DLeg V. Sec MGM 90.00 Local Co-ordinate Reference: Well R-28 (usft) (usft) TVD Reference: Mean Sea Level (usft) 631,474.644 MD Reference: ORIG KELLY BUSHING @ 51.20usft (DOYON 16) (°) North Reference: True 8,595.08 498.89 Survey Calculation Method: Minimum Curvature 5,977,686.438 631,837.814 Database: EDM R5K-Alaska PROD -ANCP1 2,499.29 Inc Azi TVDSS NIS ISM Northing 5,977,607.914 Easting 631,561.685 DLeg V. Sec TFace 90.00 294.33 (usft) (usft) (usft) (usft) 5,977,656.758 (usft) 631,474.644 (°1100usft) (usft) (°) 95.20 277.41 8,595.08 498.89 -2,525.03 5,977,502.669 5,977,686.438 631,837.814 631,379.350 12.00 2,499.29 160.41 90.00 279.18 8,593.00 505.49 -2,570.26 5,977,508.451 5,977,694.862 631,792.476 631,313.945 12.00 2,543.07 161.17 90.00 285.69 8,593.00 517.15 -2,623.19 5,977,519.168 5,977,698.072 631,739.353 631,280.110 12.00 2,595.97 90.00 90.00 297.69 8,593.00 554.04 -2,715.94 5,977,554.381 5,977,721.301 631,645.961 631,183.041 12.00 2.695.62 9000 90.00 308.01 8,593.00 600.62 -2,788.10 5,977,599.660 5,977,764.204 631,572.988 631,092.924 12.00 2,780.71 9D.00 90.00 306.33 8,593.00 609.08 -2,799.25 5,977,607.914 631,561.685 12.00 2,794.39 -90.00 90.00 294.33 8,593.00 659.48 -2,885.41 5,977,656.758 631,474.644 12.00 2,893.77 -90.00 90.00 282.33 8,593.00 690.86 -2,980.16 5,977,686.438 631,379.350 12.00 2,992.92 -90.00 90.00 274.41 8,593.00 700.46 -3,045.41 5,977,694.862 631,313.945 12.00 3,056.11 -90.00 90.04 278.49 8,592.99 704.28 -3,079.19 5,977,698.072 631,280.110 12.00 3,088.33 89.50 90.14 290.49 8,592.84 729.24 -3,175.83 5,977,721.301 631,183.041 12.00 3,186.47 89.50 90.24 302.49 8,592.51 773.76 -3,265.17 5,977,764.204 631,092.924 12.00 3,286.25 89.52 90.28 308.01 8,592.31 800.30 -3,302.73 5,977,790.061 631,054.902 12.00 3,331.51 89.56 90.73 301.54 8,591.83 831.07 -3,347.05 5,977,820.038 631,010.032 12.00 3,384.69 -86.001 91.53 289.57 8,589.86 874.12 -3,437.09 5,977,861.463 630,919.247 12.00 3,484.48 -86.06 92.27 277.58 8,586.53 897.54 -3,534.06 5,977,883.134 630,821.875 12.00 3,582.27 -86.29 92.44 274.46 8,585.46 900.27 -3,559.90 5,977,885.396 630,795.998 12.00 3,606.83 -86.69 92.49 283.35 8,582.27 911.70 -3,632.86 5,977,895.521 630,722.847 12.00 3,677.79 89.50 92.46 295.36 8,577.94 944.75 -3,726.95 5,977,926.880 630,628.191 12.00 3,777.03 89.88 92.32 307.37 8,573.75 996.67 -3,812.10 5,977,977.253 630,542.128 12.00 3,876.15 90.40', 92.31 308.09 8,573.51 1,000.34 -3,816.85 5,977,980.837 630,537.319 12.00 3,882.00 90.91 89.94 297.05 8,571.66 1,05D.85 -3,895.91 5,978,029.925 630,457.367 12.00 3,975.01 -102.00 2162017 12: 34 55P Page 4 COMPASS 5000.1 Build 81B Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB R Pad Weft: R-28 Wellbore: R -28A Design: R -28A WPOS Planned Survey MD Inc (usm (°I 11,600.00 87.42 11,606.00 87.27 i6 11,700.00 87.32 11,800.00 87.49 11,806.00 87.50 16 11,900.00 89.11 11,986.00 90.61 TD at 11986.00 2/6/2017 12:34:55PM Page 5 COMPASS 5000.1 Build 81B BP Far aa BP Coil Tubing Report EIMER HUGHES Local Corordinate Reference: Well R-28 TVD Reference: Mean Sea Level MD Reference: ORIG KELLY BUSHING @ 51.20usft (DOYON 16) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Azi TVDSS NIS EAN Northing Easting DLeg V. Sec TFace (°) (usft) (usft) (usft( (usft( (usft) (°1100usft) (usft (°) 285.33 8,573.97 1,086.94 -3,988.95 5,978,064.332 630,363.704 12.00 4,074.58 -102.22 284,62 8,574.25 1,088.49 -3,994.74 5,978,065.777 630,357.884 12.00 4,080.48 -101.95 295.91 8,578.70 1,120.96 4,082.68 5,978,096.665 630,269.387 12.00 4,173.90 90.00 307.92 8,583.24 1,173.68 4,167.32 5,978,147.856 630,183.826 12.00 4,272.89 89.47 308.65 8,583.51 1,177.39 4,172.02 5,978,151.486 630,179.053 12.00 4,278.73 88.92 297.48 8,586.29 1,228.56 4,250.64 5,978,201.234 630,099.536 12.00 4,371.60 -82.00 287.26 8,586.50 1,261.25 4,330.07 5,978,232.489 630,019.546 12.00 4,457.40 -81.67 2/6/2017 12:34:55PM Page 5 COMPASS 5000.1 Build 81B bruMlo wa WELWOHE DETAILS: H-2aA a'+6m-+9.6iH+�Nannµ WE.. PrO�act Prutlh0e Bay AY9�![Nvh:1LR Site: PBR Pad T/d wP.etici'm R-2977 caab ^na lydEl B.k -W+I q-ID. uue Nmh WeA. R-2H y =Sa�,S>�,� °am.Nry°IW-N—fiW�' BAKER Wellbore: R-28A ff44// dp�9b.e,n, sR-28xmnlvs19e1ere sM-p.00N.0.00E) 0 bp Plan: R-29A WPW Plus 50W M0 R-2B1R-2877 we. ,rz4, Parent Wellbore: 9100 ua�sweaW Nee OAIG NFllV 908M4G@5t10unX(0GVON 167 N m 9 Ta an MD: 9100.00 btln0 hum eae HUGHES Easing (100 usiMn) -..__... o21 8 e e 8 8 8 3 S 1 1 8 59)&9001,08/11-08AL1 5978900 R30/R-30 yoo A4FllR-08AP81-15/R-15A 9 R-02/11-02 59)9800 0 R 41/11-41 $O R-OB/R-07777 5978800 41, 59]8)00' QOro g by by 59]8]00 3 R-2918-29 ry m a 597%% N ' h� �+ p ho 5978600 5978500 Q ,q) y Do p 9 5978500 dh S� o roo h 5978400 be m 5978400 00 5978300 � �ryb o yo 00 �� 5979300 m o- roo h 5979200. 59]8200 R-28A W P08 P Oft MV 0 0 0 59791004N 59]8100 0 0 59)8000 0 �)BOOO �z 59))900 59])900$ 0 0 ' h t 59))800 �911800 c; z ro 5977700 m 5977700 p 59))600-5977600 5977500 N 5977500 o 5977400 o 0 59))400 m R-29/R-29A m m ton 5977300 - 0 59T1300 m o R-28/R-28 m ao 597720D W R-14/11-14 Wa o 59])200 N 59]]100 0 59))100 0 R-9 0� 597700D00 N-11/11-1177 qq4/R-1477 R-39IR--39IR�33A 597)000 R-39'11 39AL1 PBl - 59)6900 R-39 H 39ALI 159)6900 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Easting (100 usAAn) Mean Sea Level Ra Prudh" Amwa]m.Ro-n WELLBORE DETAIL$: R -28A RE08F WOwIAPOI �.. M: Bay eaPuwm:nn ." {1 She: PBRPad ua+d=rw R-2BA coam.eelxel wts. waan,nuwm N WN: R-28 ssg sYla kd RVOIR m Ain DWLaw BMM W-2&AW M1�L ObMaaetAt s«eon(V61 ReMxee. BM-I68LLYB oq PIsS: R•29AWPo81R-?ati.B1A) m: i PmeM Wellbme: R-28 Akawe]CepNeetnrn w CNf.�LYBU9fANGQ51RNfl910Y�w 16) MOM ID71ean MD: 9/00.00 cdaunm Nemoa'ummcweete G W tr F Me: R -28A P08 R2AAFaalifi' R -29A Fauh7 R-28AFWt2 R-2AATerg R-2 / R-280. Targuls3 11-28ATugetV \R 28A Target Ml 2xA Fault5 West( -)/East(+) (250 usftlin) R-28AFau11 81 WELL DETAILS: R-20 Oraund Level: 1920 .W -S aE/-W NoMmg EMng LeOdude Longitude Slot 0.00 0.00 59'!709.160 031371.100 70.20'42955N 148.5433.451W SECTIONDETAILS ANNOTATIONS Sec MD Mc Ad wTVD -WS a&W 04 TFece VS8d Target ND MD AMO(eOOn 1 9100.00 30.00 283.28 8529.6B 198.67 -08540.5 OAO 0.00 1764.30 8529.68 9100.00 R-28AIA MSulvey 2 9200.00 30.37 285.50 8616.12 211.16 -1902.75 1.18 72.621813,72 861&12 9200.00 R-2BAdua1SuweyT1P 3 9250.00 30.53 286.14 8659.22 218.07 -1927.12 0.72 64.02 1838.73 8659.22 9250.00 KOP 4 9270.00 32.10 2870.3 8676.31 221.11 -1931.06 9.00 3D.00 1849.02 8676.31 9270.00 End9dey1008 5 9320.00 47.97 299.51 8714.52 234.43 -1966.1D 35.00 30.00 1880.96 8714.52 932D.00 5 6 9504.33 110.00 318.69 8748]6 345.17 -2096.97 35.00 20.00 2046.38 874&36 9504.33 EM35d6g71008 7 9709.33 110.00 292.51 8678.25 456.35 425214 12.00 -90.00 2234.08 867&25 9709.33 7 8 SB69.33 110.00 27208 862352 48810 4398.36 12.00 -90.00 2379.98 8623.52 9869.33 S 9 10045.77 9100 279.18 8593.00 505A9 -257016 12.00 160.00 2543.07 8593.00 10045.77 9 10 iD28&00 90.00 3DBB1 8593.00 600.62 4788.10 12.00 90.00 2780.71 8593.00 10286.00 10 11 105fi&00 90.00 274.41 8593.00 700.46 3045.41 12.00 -90.00 3056.11 8593.00 10566.00 11 12 1OBWA 9018 308.01 8592.31 800.70 330273 12.00 89.50 3331.51 859231 10846.00 12 13 11126.00 92.44 274.46 8585.46 900.27 3559.9D 12.00 36.00 3606.63 658546 11126.00 13 14 11406.00 92.31 308.09 8573.51 1000.34 3816.85 12.00 89.50 3882.00 857151 11406.00 14 15 11606.00 87.27 280.62 857415 1008.49 -3994.74 12.00 -102.00 40BOA8 857425 11606.00 15 16 11806,00 8750 308.65 8583.51 117239 417202 12.00 90.00 4278.73 8583.51 11806.00 16 17 11986.00 90.61 28716 8586.60 1261.25 4330.07 12.00 -82.00 4457.40 85815,50 11986.00 TDa111986.00 G W tr F Me: R -28A P08 R2AAFaalifi' R -29A Fauh7 R-28AFWt2 R-2AATerg R-2 / R-280. Targuls3 11-28ATugetV \R 28A Target Ml 2xA Fault5 West( -)/East(+) (250 usftlin) R-28AFau11 81 B S e R428 1 urrcY P R-ISATar,IMI g.7gAT ✓<W2 R-38ATnrgel kJ �_ . R-281Targele4. J. KOP R -2&R 180. - 9 11 11 12 13 I 15 ifi IItetll .00 8 I I 87 5 l 1 II e I n Se Level l 91 1400 1500 1600 17M 1800 1900 200D 2100 MOD 23M 2400 2500 2600 2]00 28(10 2900 3NXl 3100 3200 3300 3400 3.5(1(1 3000 3700 38M 391111 4000 41M 4200 4300 MOD 4500 MOD 4719 4800 900 51100 51M 5200 5300 Vertical Section at 295.00° (100 usftlin) ANTI -COLLISION SETTINGS COMPANY DETAILS: North America - ALASKA - BP N, ��.■ Calculation Method: Minimum Curvature Interpolation Tal: 25.00 BAKER From: Error System: ISCWSA a To Depth Range From: 910 .00 00 Results Limited Centhe Distance: 11 Scan Method: Tray. Cylinder North HUGHES Centre 1395.46 Vice: Reference: R : ce: -28A Plan: -28A WPOB -28/R -20A) Mu Warninrro Basedic (R Rethod:ules Project: Site: Prudhoe Bay PB R Pad From Colour To MID b Well: R-28 p Wellbore: R-28( ' Plan: R -28A WP08 (R -28/R -28A) From Colour To MID Gr414tl 14va1: 1620 Depth Range: 9100.00 Toll 986.00 9100 - 9380 NK ARN aw " aoNYnp 9�A111Y.12 ai IaIIIIi Lo1111i 6oei no.aratir'l 1.6'N 6N51W See Sec MD Iro Aa TVD +W -S .F/ -W Oleg TFace VSec1 Possible Magnetic Interference: 9380 9500 1 9100.00 30.00 283.28 8529.68 198.67 -1854.05 0.00 0.00 1764.30 From KOP to 9,380' MD 0100 - 2 9200.00 30.37 285.50 8616.12 211.16 -1902.75 1.18 72.62 1913.72 340- 20 9500 11550 3 9250.00 30.53 286.14 8659.22 218.0] -1927.12 O72 64.02 1838.73 4 9270.00 32.10 287.83 8676.31 221.11 -1937.06 9.00 30.00 1849.02 90 _ _ _ _ 11550 - _ 11700 5 9320.00 47.97 299.51 8714.52 234.43 -1966.10 35.00 30.00 1880.96 6 9504.33 110.00 318.69 8748.36 345.17 -2096.97 35.00 20.00 2046.38 _ _ _ 11700 - - 11986 7 97°9.33 110.00 292.51 8678.25 45685 -2252.24 12.00 90.00 2234.08 8 9869.33 110.00 272.00 0623.52 48820 -2396.36 12.00 90.00 2379.98 320 80 40 9 10045.77 90.00 279.10 8593.00 505.49 -257028 12.00 160.00 2543.07 R 28AWP08 10 11 10266.00 10566.00 90.00 90.00 306.01 8593.00 Idle 62 2]4.41 8593.00 700.46 -2788.10 -3045.41 12.00 12.00 90.00 90.00 2780.71 3056.11 70 12 10846.03 W20 308.01 859281 800.30 -3302.73 12.00 6950 3331.51 \ 13 11126.00 92.44 274.4fi 9565.46 900.27 -3559.90 12.00 -86.00 3606.83 14 1140fi.00 92.31 308.09 8573.51 1000.34 -3616.85 12.00 89.50 3882.00 \ 15 11606.00 87.27 284.62 8574.25 1088.49 -399474 12.00 -102.00 4080.48 60 16 11806.00 87.50 308.65 8583.51 11T7.39 -4172.02 12.00 90.00 4278.73 \ 17 11986.00 90.61 287.26 0506.50 1261.25 -4330.07 12.00 412.00 11 30G/50 0 A 40 6UPVEYPROGMM 30 OMe IDl611-01Na]p.W VXYLN:Yas Vpsiun'. o f Prue Di T4 swepRnn Tool 1gR.0e R000I 1'RNumoo erGCTmiIticMIR-291 GCi.Yb 260 20 6D 111 11986.87 R-2BRWPe91"Itool MWG 0240 340 20 10 200 270 '9 i00\70 90 320 40 \ �\ 93 160 X60 260,. -`� 1001 120 116$9 R-28A%PO8 - .. 40 R -29A -29 80 . 40 1 \ 270 R.28: 11847 90 240 `, `120 9323 \ / 40. \ 9393 - i / \ L'EG ERO 80 - \ 45RR-161,'-IR dol.P 1k R-1 M. F1MY3 g1 12D 3432 140 R-1]."176. PW 115 R1 a1I /120 714-018-0339 Cel Phone - Fr17,ri of \ 90]34L7604 E1neWn, R-28 'R-22. Iii Ri Vl \ 160 Yoshi, Ragdict-Survey Manager 90 R,02. Fi 9 Keekto ovo 9073478436.Io Call Phone •- R-87, Ri Ri VI 22D 14D Tdi$furdiVd°I-01C°rdinalor 200-. 16.0 , R.2 9.Rage Rage V1 11631 2BD 945$ 907-301-1858 Cel Phone 100 nAP. Ri R -?i V1 -- Fri Ri R-28 Patrick Rider - MWD Connector 907-952-3497 Cdl Phone 160 - RaiR..flaw WPIOY➢ 200 240 ]-Q9A Catl ullich.opelationsMdRa9elgzimuth from North vs Centre to Centre Separation [10 R�49.Ra94u.Ra94uw usfUin] -•R-3a.R-99,LIFFIR"MLIPIII V° 180 1162 907-382-5534 Cal Phone Azimuth them North [y vs Centre to Cem a Separation 140 us%n1 ��♦~:BP Z p Travelling Cylinder Report �N Company: North Amedca- ALASKA -BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 Usti Output errors are at Reference Wellbore R -28A Database: Reference Design: R -28A WP08 Offset TVD Reference: ri.m BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Reference R -28A WPOS GCT -MS =filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference MWD- Standard interpolation Method: MD Interval 25.00usft Error Model: ISCWSA 3epth Range: 9,100.00 to 11,986.00usft Sun Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,395.46 usft Error Surface: Elliptical Conic Survey Tool Program Date 2/0/2017 From To (usft) (usft) Survey (Wellbore) 100.00 9,100.00 1 Schlumberger GCT multishol (R-28) 9,100.00 11,986.00 R -28A WP08 (R -28A) Casing Points Tool Name Description GCT -MS Schlumberger GCT multishot MWD MWD- Standard Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 80.00 28.80 20" 20.000 30.000 3,020.00 2,967.65 103/4" 10.750 13.500 9,181.00 8,599.72 75/8" 7.625 9.625 9,250.00 8,659.22 51/2" Planned TOWS 5.500 6.000 11,986.00 8,588.50 27/8" 2.875 4.250 Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) )usft) PB M Pad M-04 - M-04 - M-04 Out of range PB R Pad R-01 - R-01 - R-01 9,116.52 9,375.00 1,179.16 221.59 987.60 Pass- Major Risk R -02 -R -02-R-02 9,800.00 9,100.00 1,209.68 140.95 1,073.44 Pass - Major Risk R-02 - R -02A - R -02A WP10 9,625.00 10,969.20 1,147.07 10,728.73 -9,513.15 FAIL - Major Risk R-03 - R-03 - R-03 Out of range R-03 - R -03A - R -03A Out of range R-03 - R -03B - R -03B Out of range R-08 - R -08A - Plan #21 R -08A update Out of range R-08 - R -OSA- R-0BA Out of range R-08 - R-0BAL1 - R-0BAL1 Out of range R-08 - R-08APB1 - R-OBAPBI Out of range R-11 - R-11 - R-11 Out of range R-11 - R -11A- R -11A Out of range R-14 - R-14 - R-14 10,268.28 9,750.00 354.42 11.92 350.54 Pass - Minor 1/10 R-14 - R -14A - R -14A 10,268.28 9,750.00 354.42 11.92 350.54 Pass - Minor 1/10 R-15 - R -15A- R -15A 9,775.00 10,525.00 1,171.96 303.35 869.98 Pass - Major Risk R-17 - R-1 7B - Plan #15 R -17B approved 9,109.61 13,350.00 897.32 148.77 755.67 Pass- Major Risk R-17 - R -17B - R -17B 9,160.21 13,475.00 88248 149.03 742.45 Pass -Major Risk R -28 -R -28-R-28 9,404.65 9,450.00 81.86 8.48 81.86 Pam -NOERRORS R-29 - R-29 - R-29 11,440.79 10,100.00 477.87 250.18 242.36 Pass - Major Risk R-29 - R -29A - R -29A 11,648.21 10,700.00 111.49 11.80 111.19 Pass -Minor 1/10 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation ZZ/2017 1:02:42PM Page 2 COMPASS 5000.1 Build 618 Well Blank—7R2-AC BOP Schematic 'ate Quick Test Sub to Otis 1.1 ft Top of 7" Otis F-0—oft-14---.—.--.—.—.—. - �CDR2 Rig's Drip Pan Distances from top of riser Excluding quick -test sub Top of Annular F 0.0 ft 7-1N6" 5k Flange x r Otis Box B5 Deployment Ci 3" Pipe/Slips I 6.6 ft I� Cu 2-318"x3.112" VBRs 7.4 ft Bt Kill Line Ci Blind/Shears 10.Oft CL 2-3/8" Combi's 10.7 ft CI of Top Swab iHydril 71110 C Top Annular Element 0.7 ft Annular Bottom Annular 2.Oft a. CL Blind/Shears 3.3 ft CI 2-318" Combi's 4.1 ft B5 Deployment Ci 3" Pipe/Slips I 6.6 ft I� Cu 2-318"x3.112" VBRs 7.4 ft Bt Kill Line Ci Blind/Shears 10.Oft CL 2-3/8" Combi's 10.7 ft CI of Top Swab 13.3 ft '*—Swab 2 Test Pump Hose L/ Swab 1 CI of Bottom Swab 14.8 ft T1 A T2 CL Flow Tee 16.2 ft BOP2 CI of SSV 17.5 k Master 2 } Fusabla CL of Master Valve 19.0 ft BON Master 1 LDS 20.5ft �� Gound Level 0 North America - ALASKA - BP Prudhoe Bay PB R Pad R-28 R -28A Plan: R -28A WP08 BP Coil Tubing Report 06 February, 2017 ri.a BAKER HUGHES 40¢o Model Name ® &� b p °s14,O" Site Position: Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PS R Pad Well: R-28 Wellbore: R -28A Design: R -28A WP08 BP Model Name Sample Date ream BP Coil Tubing Report Site Position: Northing: BAKER Latitude: 70° 20'29.100 N From: Map HUGHES 637,446.420 usft Local Coordinate Reference: Well R-28 Position Uncertainty: 0.00 usft Slot Radius: TVD Reference: Mean Sea Level 1.05 ° MD Reference: ORIG KELLY BUSHING @ 51.20usft (DOYON 16) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, GPS, PRUDHOE BAY Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK 14267`15864] Using Well Reference Point Map Zone: NAD27`OGP-Usa AK/ Alaska zone 4126734'1586, Using geodetic scale factor Site - PB R Pad, TR -12-13 Model Name Sample Date Declination (°) Well Site Position: Northing: 5,975,706.220 usft Latitude: 70° 20'29.100 N From: Map Easting: 637,446.420 usft Longitude: 148° 53'4.328 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.05 ° Wellbore R -28A Magnetics Model Name Sample Date Declination (°) Well R-28, R-28 BGGM2016 8/1/2017 Well Position -NIS 0.00 usft Northing: 5,977,049.160 usft +E/ -W 0.00 usft Easting: 634,371.180 usft Position Uncertainty 0.00 usft Wellhead Elevation: 19.64 usft Wellbore R -28A Magnetics Model Name Sample Date Declination (°) BGGM2016 8/1/2017 17.72 Design R -28A WPDB Audit Notes: Version: Phase: PLAN Vertical Section: Depth From (TVD) FN/ -S (usft) (usft) -19.84 0.00 Dip Angle 81.01 Te On Depth: +E/ -W (usft) 000 Latitude: Longitude: Ground Level: Field Strength (nT) 57,551 9,100.OD Direction (°) 295.00 70' 20'42.855 N 148'54'33.451 W 19.20 usft 2162017 12:34 55P Page 2 COMPASS 5000.1 Build SIB BP rrA.s byBP Coil Tubing Report BAKER te HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB R Pad Well: R-28 Wellbore: R -28A Design: R -28A WP08 Survey Tool Program Date 2/6/2017 From To (usft) (usft) Survey (Wellbore) 100.00 9,100.00 1 Schlumberger GCT multishot (R-28) 9,100.00 11,986.00 R -28A WP08 (R -28A) Planned Survey MD Inc TVDSS (usft) (ry EM 9,100.00 30.00 R-28 Actual Survey DLeg 9,200.00 30.37 R-28 Actual Survey TIP (usft) 9,250.00 30.53 KOP (usft) 9,270.00 32.10 End 9deg1100ft 9,300.OD 41.49 9,320.00 47.97 5 632,514.011 9,400.00 74.72 9,500.00 106.54 9,504.33 110.00 End 35deg/100ft -1,902.75 9,600.00 110.00 9,700.00 110.00 9,709.33 110.00 7 8,659.22 9,800.00 110.00 9,869.33 110.00 8 0.72 9,900.00 106.54 21612017 12:34: 55PM Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Tool Name Description GCT -MS Schlumberger GCT multishot MWD MWD - Standard Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature EDM R5K - Alaska PROD - ANCP7 Azi TVDSS WS EM Northing Fasting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 283.28 8,529.68 198.67 -1,854.05 5,977,214.543 632,514.011 0.00 1,764.30 285.50 8,816.12 211.16 -1,902.75 5,977,226.166 632,465.106 1.18 1,813.72 286.14 8,659.22 218.07 -1,927.12 5,977,232.636 632,440.609 0.72 1838.73 287.83 8,676.31 221.11 -1,937.06 5,977,235.497 632,430.618 9.00 1,849.02 295.74 8,700.32 227.89 -1,953.65 5,977,241.973 632,413.914 35.00 1,866.92 299.51 8,714.52 234.43 -1,966.10 5,977,248.293 632,401.353 35.00 1,880.96 309.09 8,752.60 274.20 -2,023.04 5,977,287.025 632,343.711 35.00 1,949.38 318.26 8,749.79 342.11 -2,094.26 5,977,353.646 632,271288 35.00 2,042.63 318.69 8,748.36 345.17 -2,096.97 5,977,356.658 632,268.522 35.00 2,046.38 306.48 8,715.64 405.89 -2,163.04 5,977,416.177 632,201.386 12.00 2,131.91 293.71 8,681.44 452.90 -2,244.17 5,977,461.728 632,119.426 12.00 2,225.32 292.51 8,678.25 456.35 -2,252.24 5,977,465.025 632,111.300 12.00 2,234.08 280.94 8,647.24 480.82 -2,333.70 5,977,488.037 632,029.425 12.00 2,318.25 272.08 8,623.52 488.20 -2,398.36 5,977,494.255 631,964.641 12.00 2,379.98 273.39 8,613.91 489.60 -2,427.45 5,977,495.128 631,935.540 12.00 2,406.93 Page 3 0.00 72.62 64.02 30.00 30.00 23.64 20.00 15.27 15.54 -87.90 -87.81 -89.80 -88.01 -88.48 160.00 COMPASS 5000.1 Build 81B Planned Survey BP WARS pBP Coil Tubing Report HUGHES MD Company: North America - ALASKA - BP Local Coordinate Reference: Well R-28 NIS Project Prudhoe Bay TVD Reference: Mean Sea Level DLeg She: PB R Pad MD Reference: ORIG KELLY BUSHING @ 51.20usft (DOYON 16) Well: R-28 North Reference: True (usft) Wellbore: R -28A Survey Calculation Method: Minimum Curvature ('I100usft) Design: R-28AWP08 Database: EDM RSK-Alaska PROD -ANCP1 95.20 Planned Survey MD Inc Azi TVDSS NIS EIW Northing Easting. DLeg V. Sac TFace (usft) (') (% (usft) (usft) (usft) (usft) (usft) ('I100usft) (usft) r) 10,000.00 95.20 277.41 8,595.08 498.89 -2,525.03 5,977,502.669 631,837.814 12.00 2,499.29 160.41 10,045.77 90.00 279.18 8,593.00 505.49 -2,570.26 5,977,508.451 631,792.476 12.00 2,543.07 161.17 9 10,100.00 90.00 285.69 8,593.00 517.15 -2,623.19 5,977,519.168 631,739.353 12.00 2,595.97 90.00 10,200.00 90.00 297.69 8,593.00 554.04 -2,715.94 5,977,554.381 631,645.961 12.00 2,695.62 90.00 10,286.00 90.00 308.01 8,593.00 600.62 -2,788.10 5,977,599.660 631,572.988 12.00 2,780.71 90.00 10 10,300.00 90.00 306.33 8,593.00 609.08 -2,799.25 5.977,607.914 631,561.685 12.00 2,794.39 -90.00 10,400.00 90.00 294.33 8,593.00 659.48 -2,885.41 5,977,656.758 631,474.644 12.00 2,893.77 -90.00 10,500.00 90.00 282.33 8,593.00 690.86 -2,980.16 5,977,686.438 631,379.350 12.00 2,992.92 -90.00 10,566.00 90.00 274.41 8,593.00 700.46 -3,045.41 5,977,694.862 631,313.945 12.00 3,056.11 -90.00 11 10,600.00 90.04 278.49 8,592.99 704.28 -3,079.19 5,977,698.072 631,280.110 12.00 3,088.33 89.50 10,700.00 90.14 290.49 8,592.84 729.24 -3,175.83 5,977,721.301 631,183.041 12.00 3,186.47 89.50 10,800.00 90.24 302.49 8,592.51 773.76 -3,265.17 5,977,764.204 631,092.924 12.00 3,286.25 89.52 10,846.00 90.28 308.01 8,592.31 800.30 -3,302.73 5,977,790.061 631,054.902 12.00 3,331.51 89.56 12 10,900.00 90.73 301.54 8,591.83 831.07 -3,347.05 5,977,820.038 631,010.032 12.00 3,384.69 -86.00 11,000.00 91.53 289.57 8,589.86 874.12 -3,437.09 5,977,861.463 630,919.247 12.00 3,484.48 -86.06 11,100.00 92.27 277.58 8,586.53 897.54 -3,534.06 5,977,883.134 630,821.875 12.00 3,582.27 -86.29 11,126.00 92.44 274.46 8,585.46 900.27 -3,559.90 5,977,885.396 630,795.998 12.00 3,606.83 -86.69 13 11,200.00 92.49 283.35 8,582.27 911.70 -3,632.86 5,977,895.521 630,722.847 12.00 3,677.79 89.50 11,300.00 92.46 295.36 8,577.94 944.75 -3,726.95 5,977,926.880 630,628.191 12.00 3,777.03 89.88 11,400.00 92.32 307.37 8,573.75 996.67 -3,812.10 5,977,977.253 630,542.128 12.00 3,876.15 90.40 11,406.00 92.31 308.09 8,573.51 1000.34 -3,816.85 5,977,980.837 630,537.319 12.00 3,882.00 90.91 14 11,500.00 89.94 297.06 8,571.66 1,050.85 -3,895.91 5,978,029.926 630,457.367 12.00 3,975.01 -102.00 2161201712:34.55PM Page 4 COMPASS 5000.1 Build BIB Planned Survey BP IGA2 t (, p BP Coil Tubing Report BAKER O HUGHES Company: North America - ALASKA- BP Local Coordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB R Pad MO Reference: ORIG KELLY BUSHING @ 51.20usft (DOYON 16) Well: R-28 North Reference: hue Wellbore: R -28A Survey Calculation Method: Minimum Curvature Design: R -28A WP08 Database: EDM RSK- Alaska PROD -ANCPi Planned Survey MD Inc Azi TVDSS NIS ENV Northing Easting DLeg V. Sec TFace (usft) V) (°) (usft) (usft) (usfq (usft) (usft) (°1100usft) (usft) O 11600,00 87.42 285.33 8,573.97 1,086.94 -3,988.95 5,978,064.332 630,363.704 12.00 4,074.58 -1D2.22 11,606.00 87.27 284.62 8,574.25 1,088.49 -3,994.74 5,978,065.777 630,357.884 12.00 4,08D.48 -101.95 15 11,700.00 87.32 295.91 8,578.70 1,120.96 -4,082.68 5,978,096.665 630,269.387 12.00 4,173.90 9D.00 11,800.00 87.49 3D7.92 8,583.24 1,173.68 -4,167.32 5,978,147.856 630,183.826 12.00 4,272.69 89.47 11,806.00 87.50 308.65 8,583.51 1,177.39 -4,172.02 5,978,151.486 630,179.053 12.00 4,278.73 88.92 16 11,900.00 89.11 297.48 8,586.29 1,228.56 -4,250.64 5,976,201.234 630,099.536 12.00 4,371.60 -82.00 11,986.00 90.61 287.26 8,586.50 1,261.25 4,330.07 5,978,232.489 630,019.546 12.00 4,457.40 -81.67 TD at 11986.00 2W017 12.34:55PM Page 5 COMPASS 5000.1 Build 81B Targets BP WARE 01 p BP Coil Tubing Report NUGIIES to -hitlmiss target Dip Angle Dip Dir. TVD +WS +PJ -W Company: North America - ALASKA- BP Local Coordinate Reference: Well R-28 -Shape (°) (°) (usft) (usft) Project: Prudhoe Bay TVD Reference: Mean Sea Level Latitude Longitude Site: PB R Pad MD Reference: ORIG KELLY BUSHING @ 51.20usft (DOYON 16) Well: R-28 Norm Reference: True Wellbore: R -28A Survey Calculation Method: Minimum Curvature - Polygon Design: R -28A WP08 Database: EDM R5K-Alaska PROD -ANCP1 Targets Target Name -hitlmiss target Dip Angle Dip Dir. TVD +WS +PJ -W Northing Easting -Shape (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude R -28A Polygon 0.00 0.00 0.00 325.62 -1,656.74 5,977,345.000 632,709.000 70° 20'46.056 N 148° 55' 21.859 W - plan misses target center by 8532.90usft at 9100.00usft MD (8529.68 TVD, 198.67 N, -1854.05 E) - Polygon Point 1 0.00 0.00 0.00 5,977,345.00 632,709.00 Point 0.00 341.23 -901.10 5,977,670.00 631,602.00 Point 0.00 496.20 -1,343.43 5,977,817.00 631,357.00 Point 0.00 725.21 -2,010.48 5,978,034.00 630,686.00 Points 0.00 900.64 -2,422.44 5,978,202.00 630,271.00 Point 0.00 1,254.08 -2,944.23 5,978,546.00 629,743.00 Point 0.00 1,074.55 -3,084.48 5,978,364.00 629,606.00 Point 0.00 717.07 -2,504.75 5,978,017.00 630,192.00 Point 9 0.00 518.79 -2,045.19 5,977,827.00 630,655.00 Point 10 0.00 403.66 -1,705.17 5,977,718.00 630,997.00 Point 11 0.00 137.19 -1,012.78 5,977,464.00 631,694.00 Point 12 0.00 -247.1D -109.46 5,977,096.00 632,604.00 Point 13 0.00 -114.31 -40.06 5,977,230.00 632,671.00 Point 14 0.00 0.00 0.00 5,977,345.00 632,709.00 R -28A Fault 3 0.00 0.00 0.00 -346.96 -908.62 5,976,686.000 633,469.000 70° 20' 39.442 N 148° 54' 59.997 W - plan misses target center by 8599.24usft at 9100.00usft MD (8529.68 TVD, 198.67 N, -1854.05 E) - Polygon Point 1 0.00 0.00 0.00 5,976,686.00 633,469.00 Point 2 0.00 956.98 -2,496.45 5,977,598.OD 630,956.00 R -28A Target 01 0.00 0.00 8,592.00 522.17 -2,577.44 5,977,525.000 631,785.000 70' 20'47.986 N 148° 55'48.762 W - plan misses target center by 15.26usft at 10056.38usft MD (8593.00 TVD, 507.29 N, -2580.71 E) - Point R -28A Fault 7 0.00 0.00 0.00 1,816.14 -5,403.92 5,978,768.000 628,936.000 70° 21'0.696 N 148° 57' 11.378 W - plan misses target center by 8671.16usft at 11986.00usft MD (8586.50 TVD, 1261.25 N, -4330.07 E) - Polygon Point 1 0.00 0.00 0.00 5,978,768.00 628,936.00 Point 0.00 686.59 -581.83 5,979,444.00 628,342.00 R -28A Target #3 0.00 0.00 8,572.00 1,035.26 -3,858.55 5,978,015.000 630,495.000 70' 20'53.027 N 148' 56'26.203 W - plan misses target center by 4.76usft at 11460.05usft MD (8571.97 TVD, 1031.25 N. -3861.12 E) ZWO17 12:34:55PM Page 6 COMPASS 5000.1 Build 81B 0BP 0.00 0.00 0.00 758.74 FKA1 y�Nr by 631,808.000 BP Coil Tubing Report 148" 55'47.968 W BAKER 8576.34usft at 9100.00usft MD (8529.68 TVD, 198.67 N, -1854.05 E) HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well R-28 Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB R Pad MO Reference: ORIG KELLY BUSHING @ 51.20usft (DOYON 16) Well: R-28 North Reference: True 631,608.00 Wellbore: R -28A Survey Calculation Method: Minimum Curvature 0.00 Design: R -28A WP08 Database: EDM RSK-Alaska PROD -ANCP1 R -28A Fault 5 0.00 0.00 0.00 758.74 -2,550.19 5,977,762.000 631,808.000 70° 20'50.313 N 148" 55'47.968 W - plan misses target center by 8576.34usft at 9100.00usft MD (8529.68 TVD, 198.67 N, -1854.05 E) - Polygon Point 1 0.00 0.00 0.00 5,977,762.00 631,608.00 Point 0.00 410.19 -1,120.92 5,978,152.00 630,680.00 R -28A Fault 4 0.00 0.00 0.00 750.99 -3,791.63 5,977,732.000 630,567.000 70' 20'50.232 N 148° 56'24.244 W - plan misses target center by 8576.94usft at 11419.59usft MD (8573.00 TVD, 1008.56 N, -3827.65 E) - Polygon Point 1 0.00 0.00 0.00 5,977,732.00 630,567.00 Point 0.00 680.69 -1,926.26 5,978,378.00 628,629.00 R -28A Fault 6 0.00 0.00 0.00 1,988.35 4,743.68 5,978,952.000 629,593.000 70° 21'2.396 N 148° 56' 52.066 W - plan misses target center by 8627.15usft at 11986.00usft MD (8586.50 TVD, 1261.25 N, 4330.07 E) -Poygon Point 1 0.00 0.00 0.00 5,978,952.00 629,593.00 Point 0.00 -595.71 645.48 5,978,368.00 630,249.00 R -28A Target #5 0.00 0.00 8,587.00 1,262.84 4,334.58 5,978,234.000 630,015.000 70° 20'55.263 N 148' 56'40.118 W - plan misses target center by 4.82usft at 11986.00usft MD (8586.50 TVD, 1261.25 N, 4330.07 E) - Point R -28A Fault 2 0.00 0.00 0.00 1,115.69 -4,718.31 5,978,080.000 629,634.000 70° 20' 53.813 N 148° 56'51.328 W - plan misses target center by B596.50usft at 11986.00usft MD (8586.50 TVD, 1261.25 N, 4330.07 E) - Polygon Point 1 0.00 0.00 0.00 5,978,080.00 629,634.00 Point 0.00 307.72 1,748.94 5,978,419.00 631,377.00 Point 3 0.00 602.76 2,420.39 5,978,726.00 632,043.00 Point 0.00 307.72 1,748.94 5,978,419.00 631,377.00 R -28A Target #4 0.00 0.00 8,584.00 1,191.43 4,200.83 5,978,165.000 630,150.000 70° 20'54.561 N 148' 56'36.208 W - plan misses target center by 6.05usft at 11837.86usft MD (8584.74 TVD, 1196.44 N, 4197.52 E) - Point R -28A Target #2 0.00 0.00 8,591.00 861.93 -3,396.55 5,977,650.000 630,960.000 70° 20'51.325 N 148" 56' 12.701 W - plan misses target center by 3.95usft at 10958.07usft MD (8590.86 TVD, 858.37 N. -3398.26 E) - Point R -28A Fault 1 0.00 0.00 0.00 336.21 -2,414.73 5,977,342.000 631,951.000 70° 20'46.158 N 148' 55'44.006 W - plan misses target center by 8549.19usft at 9100.00usft MD (8529.68 TVD, 198.67 N, -1854.05 E) - Polygon Point 1 0.00 0.00 000 5,977,342.00 631,951.00 Point 0.00 565.20 1,056.39 5,977,926.00 632,997.00 216/2017 12:34:55PM Page 7 COMPASS 50001 Build 81B by BP BP Coil Tubing Report rER BAKER Measured Vertical HUGHES Company: North America-ALASKA -BP Local Coordinate Reference: Well R-28 Depth Project: Prudhoe Bay TVD Reference: Mean Sea Level (usft) Site: PB R Pad MD Reference: ORIG KELLY BUSHING @ 51.20usft (DOYON 16) Well: R-28 Norm Reference: True 75/8" Wellbore: R-28A Survey Calculation Method: Minimum Curvature 8,659.22 Design: R-28A WP08 Database: EOM RSK- Alaska PROD -ANCP1 11,986.00 Casing Points Measured Vertical Local Coordinates Casing Hole Depth Depth +E/.W Diameter Diameter (usft) (usft) Name (in) (in) 9,181.00 8,599.72 75/8" 7.625 9.625 9,250.00 8,659.22 51/2'Planned TOWS 5.500 6.000 11,986.00 8,586.50 27/8" 2.875 4.250 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/S +E/.W (usft) (waft) (usft) (usft) Comment 9,100.00 8,529.68 198.67 -1,854.05 R-28 Actual Survey 9,200.00 8,616.12 211.16 -1,902.75 R-28 Actual Survey TIP 9,250.00 8,659.22 218.07 -1,927.12 KOP 9,270.00 8,676.31 221.11 -1,937.06 End 9deg/100ft 9,320.00 8,714.52 234.43 -1,966.10 5 9,504.33 8,748.36 345.17 -2,096.97 End 35deg/100ft 9,709.33 8,678.25 456.35 -2,252.24 7 9,869.33 8,623.52 488.20 -2,398.36 8 10,045.77 8,593.00 505.49 -2,570.26 9 10,286.00 8,593.00 600.62 -2,788.10 10 10,566.00 8,593.00 700.46 -3,045.41 11 10,846.00 8,592.31 800.30 -3,302.73 12 11,126.00 8,585.46 900.27 -3,559.90 13 11,406.00 8,573.51 1,000.34 -3,816.85 14 11,606.00 8,574.25 1,088.49 -3,994.74 15 11,806.00 8,583.51 1,177.39 -4,172.02 16 11,986.00 8,586.50 1,261.25 -4,330.07 TO at 11986.00 Checked By: Approved By: Date: 2/6/2017 12.34:55PM Page 8 COMPASS 5000.1 Build 8/B Protea: Rlstlhoe8eyuw9.�1. Site: PSR Pad MxPwkFtl WELLBORE DETAILS: R -28A aEFBiNCEIN'ORM°ipN R-2820 c44MreelIA�Relexw'. wuape.nuwia aWRanen: Well: R-20 %eel=5>xlam uttn3eateb v4 Wellbore: R28A ae °�� Parent Wellhare: R-28 rH.W Rat: R-28AWPoBlR-2520-2620) °nuecacal Tie on MD: 9100.00 �I,%taa simws;sl2aafl80s'ultsl Slol '.. am 000 ithb.ty°y'.M ge°pr° ri.S HUGHES R -28A WP08 12-2HAFaoh6 R-18AFnuI17 i�\\\ R- RATamnMS \ RZRATrgcltl4/ R-2NATuenm R-7WR-'\ R-28ATe1Rna2 R-26ATu?m Nl R-2RAPauh..0 R-2HA Fuu115 8.28AFauh4 R -X42 -7S R-2RAFeulO 500 -5250 -5000 4750 4X0 42X1 4000 .3750 .3500 3150 M -2750 -2500 -150 -M -1750 -1500 -1250 -1000 West( -)/Fast(+) (250 usft/in) w WELL DETAILS: R-28 GmuMLewl: 1920 .N -S rH.W mmin9 Easua, La4Wde Lny4ude Slol '.. am 000 59]]0,19AN 934371.180 70.2042.855N 148°54'33A51W ' 0841M_.._ SECTIDNDEfABS ANNOTATIONS See MD 9m Ari III .NLS .ELW Dleg TFace VSect Target ND MD Annotation 1 9100.0030 .00 283.28 8529.68 198.67 -1854.05 0.00 0.00 1764.30 8529.68 9100.00 R-28AcWWSuney 2 9200.00 30.37 285.50 8616.12 211.16 -19M.75 1.18 72.62 1813.72 8616.12 9200.00 R46 Actual Survey TIP 3 9250.0030.53 286.14 8659.22 218.07 4927.12 0.72 64.02 1838.73 865&22 9250.00 KOP 4 9270.00 3210 287.83 8676.31 221.11 4937.06 9.00 30.00 1849.02 8676.31 9270.00 Erd9de9r1004 5 9320.00 47.97 299.51 8714.52 234.43 -1966.10 35.00 30.00 1880.96 8714.52 9320.00 5 '9504.33 110.00 311169 8748.36 345.17 -2096.97 35.00 20.00 2046.38 8748.36 9504.33 End 35deg11008 7 9709.33 110.00 29251 8678.25 456.35 -2252-24 12.00 .90.00 2234.08 867&25 9709.33 7 8 9869.33 110.00 272.08 8623.52 488.20 -2398.36 12.00 -90.00 2379.98 8623.52 9369.33 8 9 10045.77 90.00 279.18 8593.00 505.49 -2570.26 12.00 160.00 2543.07 8593.00 10675.77 9 10 10286.00 90.00 308.01 8593.00 600.62 .2788.10 12.00 90.00 2780.71 8593.00 10286.00 10 11 10566.00 90.00 274.41 8593.00 700.46 -3045.41 12.00 -90.00 3056.11 859100 10566.00 11 12 10846.00 90.28 308.01 8592.31 800.30 -3302.73 12.00 89.50 3331.51 8592.31 10946.00 12 13 11126.00 92:14 274.46 8585.46 900.27 -3559.90 12.00 -86.00 3606.83 858546 11126.00 13 14 11406.00 92.31 308.09 8573.51 1000.34 -3816.85 12.00 89.50 3882.00 8573.51 11406.00 14 15 11606.00 8227 284.62 8574.25 1088.49 -3994.74 12.00 -102.00 4080.48 8574.25 11606.00 15 16 11806.00 87.50 308.65 8583.51 1177.39 4172.02 12.00 90.00 4278.73 8583.51 11806.00 16 17 11986.00 90.61 287.26 8586.50 1261.25 4730.07 12.00 -8200 4457.40 8586.50 1198&00 TD at 11986.00 ri.S HUGHES R -28A WP08 12-2HAFaoh6 R-18AFnuI17 i�\\\ R- RATamnMS \ RZRATrgcltl4/ R-2NATuenm R-7WR-'\ R-28ATe1Rna2 R-26ATu?m Nl R-2RAPauh..0 R-2HA Fuu115 8.28AFauh4 R -X42 -7S R-2RAFeulO 500 -5250 -5000 4750 4X0 42X1 4000 .3750 .3500 3150 M -2750 -2500 -150 -M -1750 -1500 -1250 -1000 West( -)/Fast(+) (250 usft/in) w R -28A WP08 am 0841M_.._ 0 Tar 49 a L R R-2RAcmal Survey TlPR-2NAsn - R-2PATarpclpl R-2RATann 02 R-2flATargelp3 R-38ATueaW y - KOP R- 'SB -2F\ v Q R 'End We6/IOOH Y IU II 12 13 14 15 Ib IDm11936W id R R � 5 R _ Psd 3�dIWn v F 9001 Means Level I,, c :• 1400 IWO 1600 1900 1800 MIT NR0 2100 2200 23W 2400 2500 2510 2100 2600 2900 3000 3100 3200 3300 3400 3500 3900 3700 3M 3900 4(%ID 4110 4200 4300 Iwo 4500 4uA)0 4700 4800 4900 5M 5100 520) 5300 Vertical Section at 295.00° (100 usft/in) Pro1M:AWRoaBay Sda- POR Pad wrniirx WELLSORE DETAILS: R -29A aER3ENf£XfORVAneN R -28A c�wns�IxElwx�.m wa ase.*rv.wn Wel: R-28 smy..s:ss m� veami0wlaewe�m. wc�swxaei Wel6ae: R-28Ae�i Parent 5somll'S)Rdaena: '�+�-lo.wx.aooEl Pbn: W2BAWP0a1R-� am:errxxm� eon MrD:9100.00B"��'1B"m'reusxixc�5imsnloovoxfst celaNbn MbW. Ffvnxm Curvanva ME b2 BAKER HUGHES West( -)/East(+) (100 usftlin) 0 N N N1 Project: Prudhoe Bay ANTI -COLLISION SETTINGS COMPANY DETAILS: North America - ALASKA - BP F'.. Site: PB R Pad Interpolation Calculation Method: Minimum Curvature BAKER bp Well: R-28 rpolation Method: MD, interval: 25.00 Error System: ISCWSA Depth Range From: 9100.00 To 11986.00 C Scan Method: Tray. Cylinder North NUGI�S Wellbore: R -28A Results Limited By: Centre Distance: 1395.46 N Plan: R -28A WPDS R-28IR-28A Reference: Plan: R -28A WP08 (R -2&R -28A) Enor Sudace: Elliptical Conic ( ) Warning Method: Rules Based R-28 Possible Offset Well Magnetic Interference: From To KOP - 9,380' MD LEGEND -> R-04, R-Ia, R-14 V5 R.14 R -WA, R-MV3 - R-15. R -15A, R -15T V0 R-1]. R -ire. Plan M15 R4]B apprwM VD - R-17. R -17B, R -OB W R -n. R -n, W28 V1 .. R-02. R -UM R -03A WP10 V0 =- R.M. R-021 R02 VI • R¢B, R -M, R -MA V1 y R.39, R-29. R 29 V1 - R-01, R-01, R-01 V1 R -30,R -e RJMWPIO V0 R-39,R-39AL1, R-3MLI Vo R-39, R-"IPB1, Rd L1PBIW R -29A nm10 nllr IIr�1111r I� IiQ1101111 III111111 I Ir R-14Al1II1111 IIIIIdIli81 r WHIP IN1111111111 t�111Nr 1111NIIItlllll 0HEIIG 11111111NIII1 01111111 I IHIHIIIrII, 411111 111111111�fr �i11 111111111 _ R-29 Possible Offset Well Magnetic Interference: From To KOP - 9,380' MD LEGEND -> R-04, R-Ia, R-14 V5 R.14 R -WA, R-MV3 - R-15. R -15A, R -15T V0 R-1]. R -ire. Plan M15 R4]B apprwM VD - R-17. R -17B, R -OB W R -n. R -n, W28 V1 .. R-02. R -UM R -03A WP10 V0 =- R.M. R-021 R02 VI • R¢B, R -M, R -MA V1 y R.39, R-29. R 29 V1 - R-01, R-01, R-01 V1 R -30,R -e RJMWPIO V0 R-39,R-39AL1, R-3MLI Vo R-39, R-"IPB1, Rd L1PBIW R -29A Measured Depth (100 usflin) A O O 00 O A N J fv 7 O O O O O O O O O O O O O O O O O O O O O O O Measured Depth (100 usflin) Project: Prudhoe Bay Site: PB R Pad ANTI -COLLISION SETTINGS COMPANY DETAILS: North America -ALASKA - BP Interpolation Method: MD, interval: 25.00 Calculation MehIod, Minimum Curvature Well. R-28 Depth Range From: 9100.00 To 11986.00 Error System: ISCWSA Wellbore: R -28A Results Limited By: Centre Distance: 1395.46 Scan Method: Tray. Cylinder North Plan: R-28AWPO8R-28!11-28A ( ) Reference: Plan: R -28A WPO8 (R -2841-28A) Error Surface: Elliptical Conic Warning Method: Rules Based Depth Range: 9100.00 Toll 986.00 Possible Magnetic Interference: OfbO From KOP to 9,380' MD 340 20 90 320 ' 80 R -28A WP08 70 60 300 50 \ 40 From Colour To MD 30 9380 9380 .......................................9500 '...9140 280 11550 20 --11700 11700 10 From Colour To MD 9100 9380 9380 .......................................9500 '...9140 9500 11550 11550 --11700 11700 11986 �QO 3 0 \ 270 0 DW 11647 9C R-28 932.3 '...9140 120 260. -. 20 R. 9se \ 3 0 s. 40 M Wr?DRkIW CM11.110 TD•F 42655M 146•H 31191w 246,50 1 45 fl.15.a-1S4 P-15Pw 4r'I -� R-17,R1IM nnll5R-124h WVa Sec MO 1. Ilii ND \ 70 \q TFace Conf4ctlldD: @@ �GSEVa7g4478-4.tSC $O x'140 - 714MI-7339 PlIv6Ybefal 11-28 907-341-7604 Emergency Emr9eny 8529.68 YDsha Raybirsingh-SurveyManager 90 907.3424436 Cel Phone 0.00 Tai Sturdivant-ODCw,dinator 200 160 907 -MI -18M CJPhone 100 Palml,Rider-MWDCRardRalnr 180 907-352-3497 Cell Shoe -190275 Cad Ulnch-OperasonsManagerAzimuth from North [ °J vs Centre to Centre Separation [10 usfVin] 907382-5534 Cel Phone 3 60 80 i 90 1r' FORM BAKER HUGHES 320 ' - 200�40 160 /R.29A 120 \ 60 R-28Ai�/P08\40 80 270 R-28' 11647 9C 0.l : 1AA 932.3 120 .WS R. MoRNM .1, Ia1mWe Lon911 wk s. am M Wr?DRkIW CM11.110 TD•F 42655M 146•H 31191w 1 45 fl.15.a-1S4 P-15Pw 4r'I -� R-17,R1IM nnll5R-124h WVa Sec MO 1. Ilii ND .RV -S aP-W Dleg TFace VSec4 1 9100.00 30.00 283.28 8529.68 198.67 -1854.05 0.00 0.00 1764.30 2 9200.00 30.37 285.50 %16.12 211.16 -190275 1.18 72.62 1813.72 3 9250.00 30.53 286.14 8659.22 218.07 -1927.12 0.72 64.02 1838.73 4 9270.00 32.10 287.83 8676.31 221.11 -1937.06 900 30.00 1849.02 5 9320.00 47.97 299.51 871452 234.43 -1%6.10 35.00 30.00 1880.96 6 9504.33 110.00 318.69 8748.36 345.17 -206.97 35.00 20.00 2046.38 7 9709.33 110.00 292.51 8678.25 456.35 -2252.24 12.00 -90.00 2234.08 8 9869.33 110.00 272.08 8623.52 488.20 -2398.36 12.00 -90.00 2379.98 9 10045.T7 90.00 279.18 8593.00 505.49 -2570.26 12.00 160.00 2543.07 10 10286.00 90.00 308.01 0593.00 600.62 .2788.10 12.00 90.00 2790.71 11 10566.00 90.00 274.41 8593.00 700.46 -3045.41 12.00 -90.00 3056.11 12 10846.00 90.20 308.01 8592.31 800.30 -3302.73 12.00 89.50 3331.51 11126.00 9244 274,46 &585.46 900.27 -3559.90 12.00 46.00 3606.83 13 4 11406.00 92.31 308.09 8573.51 10%.34 -3816.85 12.00 89.50 3882.00 15 11606.00 87.27 284.62 8574.25 1088.49 -3994]4 12.00 -102.00 4080.48 -- 16 11806.00 87.50 308.65 6583,51 1177.39 1172.02 12.00 Soon 4278,73 17 11986.00 90.61 28726 8586.50 1261.25 -0330.7 12.00 -82.00 4457.40 SUIIVEYPflp3PPlA oaM:.IaIIn4r.uo4o veaaieB Ws vwvw= o" n DqN a Suwa4Ren Twl 100,00 9187.1E I:SCMuwmv,GCTm�1v4(R-aa) WTWS .Inuvo 11959.. R.RuprarR 041 MWD 340.. 0240 '---..20 320 ' - 200�40 160 /R.29A 120 \ 60 R-28Ai�/P08\40 80 270 R-28' 11647 9C 932.3 120 40. 9393 LEGEND 80 . P11, RIo, W10 V5 R14,R1oA R1M V] ` 1 45 fl.15.a-1S4 P-15Pw 4r'I -� R-17,R1IM nnll5R-124h WVa 128..9432 12D -8717, fl -178. FI7Bw • R -$B fli8 11-28 V1 160 +n02flMh.RO2AWP10W S e0.M,R�,R@V1 -was. wa9n wzaavl 220\ 200 _ 11691 9455 - , 140 R -H, V1 R.I. 1,RLl. "I Vf R-26 4. Rao. Raon RaanwPlSw 200 zoo = -- �gp R-Z9A a R -E. Ra9PL1,R NW.Iw-" fly, fla9AL1P01. flaML1PB1 w Azimuth horn North j°J vs Centree to to Centre Separation 140 ustlfin] North America - ALASKA - BP Prudhoe Bay PB R Pad I[i Travelling Cylinder Report 06 February, 2017 rias BAKER HUGHES '0 b BP FA fig pTravelling Cylinder Report BAKER ES Company: North Amedca-ALASKA - BP Project: Prudhoe Bay Reference Site: PS R Pad Site Error: 0.00 usft Reference Well: R-28 Well Error: 0.00 usft Reference Wellbore R -28A Reference Design: R -28A WP08 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference R -28A WP08 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Measured Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 9,100.00 to 11,986.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,395.46 usft Error Surface: Elliptical Conic Survey Tool Program Date 2/62017 - From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 9,100,00 1 : Schlumberger GCT multishot (R-28) GCT -MS Schlumberger GCT muhishot 9,100.00 11,986.00 R -28A WP08(R-28A) MWD MWD - Standard Casing Points Measured Vertical Casing Hole Depth Depth Allowable Diameter Diameter (usft) (usft) Name (in) (in) 80.00 28.80 20" 20.000 30.000 3,020.00 2,967.65 103/4" 10.750 13.500 9,181.00 8,599.72 75/8" 7.625 9.625 9,250.00 8,659.22 51/2"Planned TOWS 5.500 6.000 11,986.00 8,586.50 27/8" 2.875 4.250 Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) lush) PB M Pad M.04- M-04. M-04 Out of range PB R Pad R-01 - R-01 - R-01 9,116.52 9,375.00 1,179.16 221.59 987.60 Pass- Major Risk R -02 -R -02-R-02 9,800.00 9,100.00 1,209.68 140.95 1,073.44 Pass - Major Risk R-02 - R -02A - R -02A WP10 9,625.00 10,989.20 1,147.07 10,728.73 -9,513.15 FAIL - Major Risk R-03 - R-03 - R-03 Out or range R-03 - R -03A - R -03A Out of range R-03 - R -03B - R -03B Out of range R-08 - R -08A- Plan #21 R -08A update Out of range R-08 - R -08A - R -08A Out of range R-08 - R-08ALl - R-08AL1 Out of range R-08 - R-08APB1 - R-08APB1 Out or range R-11 - R-11 - R-11 Out of range R-11 - R-11 A- R-11 A Out of range R-14 - R-14 - R-14 10,268.28 9,750.00 354.42 11.92 350.54 Pass- Minor 1/10 R-14 - R -14A- R -14A 10,268.28 9,750.00 354.42 11.92 350.54 Pass- Minor 1/10 R-1 5 - R-1 5A - R-1 5A 9,775.00 10,525.00 1,171.96 303.35 869.98 Pass - Major Risk R-17 - R -17B - Plan #15 R -17B approved 9,109.61 13,350.00 897.32 148.77 755.67 Pass- Major Risk R-17-R-17B-RA713 9,160.21 13,475.00 882.48 149.03 742.45 Pass - Major Risk R -28 -R -28-R-28 9,404.65 9,450.00 81.86 8.48 81.86 Pass - NOERRORS R -29 -R -29-R-29 11,440.79 10,100.00 477.87 250.18 242.36 Pass - Major Risk R-29 - R -29A- R -29A 11 648.21 10,700.00 111.49 11.80 111.19 Pass- Minor 1110 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2162017 1:02: 42PM Page 2 COMPASS 5000.1 Build 81B P Company: North America- ALASKA - BP Project: Prudhoe Bay Reference Site: PB R Pad Site Error: 0.00 usft Reference Well: R-28 Well Error: 0.00 usft Reference Wellbore R -28A Reference Design: R-28AWPO8 BP Travelling Cylinder Report Local CG -ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: WARE BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM RSK- Alaska PROD -ANCP1 Offset Datum Summary PB R Pad - R-01 - R-01 - R-01 Reference Offset Centre to No -Go Allowable 100-1po95-GYRO Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Betel Majorli.lc Offset Well -Wellbore -Design (usft) (usft) (usft) (usft) PB R Pad Measured Venice) Measured R-30 - R-30 - R-30 Reference OffsN TooBanF Offset VNllborecentn Casep- Out of range R-30 - R -30A - R -30A WP10 11,467.81 14,415.00 747.54 322.75 425.66 Pass - Major Risk R-31 - R-31 - R-31 Depth Aalmuth rW-s Out of range R-31 - R-31 A- R-31 A Centre Di.m a Deulation Out of range R-39 - R-39ALl - R-39ALl 10,163.52 11,775.00 930.46 229.29 714.72 Pass - Major Risk R-39-R-39ALl PBI-R-39ALl Pet 9,300.00 10,925.00 1,091.37 189.40 921.47 Pass - Major Risk R-41 - R-41 - R-41 9,116.52 8,54398 9.375.00 9,080.30 Out of range Offset Design PB R Pad - R-01 - R-01 - R-01 Offset ske Errec cm us6 Survey Pmtrem: 100-1po95-GYRO Rule AssiOn etl Major Risk Onset Well E. 0.00 u.0 Refs.... West Betel Majorli.lc Measured Venice) Measured Vertical Reference OffsN TooBanF Offset VNllborecentn Casep- Centre. No Go Allowable flhmkl9 Depth Depth Depth Depth Aalmuth rW-s s& -W Hole Blas Centre Di.m a Deulation (aeN) (uml (uan) (use) (usft) (usft) 0 (usft) (esa) (is) (use) (.an) (eaft) 9,116.52 8,54398 9.375.00 9,080.30 15.55 5008 120.39 49774 4,07786 5937 1,179,18 221.59 98760 Pass- Major Risk, CC, ES, SF 9,135.63 8560.61 9,400.00 9,105.35 16.60 50.12 12822 -49747 -0.079.10 5,937 1.18957 221.75 99820 Pas. - Major Risk 9,154.73 8.577.02 9,425.00 9,130.32 15.65 50.18 12008 -497.18 -1,08035 5.937 1,200.04 221.94 1,00896 Pass - Major Risk 817382 8,593.52 9.450.00 9,155.28 15.71 5023 127.90 -496.87 -1,081.65 5937 1,21054 222.14 1,01986 Pass - Major Risk 9.19290 8,609.99 9.47500 9,100.24 15.76 5029 127.76 -49655 -1,083.00 5.937 1,22109 222.35 1,03038 Pas. - Major Risk 9,212.52 8626.92 %5000(j 9.20520 15.79 50.34 127.60 -496.22 -1,084.39 4.875 1.23164 22242 1,04127 Pass - Major Risk 9.232.46 0,644.11 9,525.00 9.230.16 15.00 5040 127.44 -49587 -11086.80 4.975 1.242,25 22256 1,052.13 Pass - Major Risk 9,250.00 8,659,22 %560.00 9155.12 15.80 50.47 12729 -49552 -1,08120 4.875 1.252.90 222.71 1,063.11 Pass - Major Risk 9,25041 8.686.44 9.575.00 9,28(1 15.01 50.53 127.21 -49516 -1,08861 4,675 1,263.75 22244 1,074.56 Pass -Major Risk 9,270.00 8,878.31 9.600.00 9.305.03 15.81 50.59 127.17 4MAE) -1,090.02 4,876 1,274.80 22195 1.08820 Pass - Major Risk 9170.00 8,676.31 8625.00 9,329.99 1581 50.66 127.00 -49443 -1,091.41 3.562 1.286.26 22207 1.098.57 Paas - Major Risk 9.270.00 8.676.31 9,65000 9,354.95 1581 50.73 12682 494.06 1092.78 3.562 1,290.02 222.30 1,111.25 Pa.a - Major Risk 9.280.00 8.684.63 9,67500 9.379.91 15.82 50.00 127.17 49380 4,094.12 3.552 1.310.10 21989 1,12308 Pass - Major Risk 9.211000 8,684.63 9,70000 9,404.07 1582 60.84 127.01 49331 -1.095.45 3.562 1,32846 219.74 1,13743 Pass - Major Risk 9,200.00 0584.63 9.72500 9,429.84 1582 50.87 126.86 492.93 1.096.78 3582 1,335.18 219.02 1.151.31 Pass - Major Risk 828000 0684.63 973000 9,434.03 1582 5088 126.83 492.86 1097.05 3.582 133776 219.03 1.154.12 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2162017 1:02.:42PM Page 3 COMPASS 5000.1 Build 810 Offset Design I BP I EARN pTravelling Cylinder Report BAKER KRES Company: - North America-ALASKA -BP Local Co-ordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB R Pad MD Reference: ORIG KELLY BUSHING @ 51.20usft '. Assigned: Major Rak Dinner Well Ersor: 000 pan (DOYON 16) Site Error: 0.00 usft North Reference: True Reference Well: R-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore R-28A Database: EDM RSK- Alaska PROD -ANCPt Reference Design: R-28A WP08 Offset TVD Reference: Offset Datum Offset Design PB R Pad - R-02 - R-02 - R-02 met she Error: 0.00 pare Survey Program: 10D-GYD-CT-CM8, 81100 -BOSS -GYRO Rule Assigned: Major Rak Dinner Well Ersor: 000 pan Refers.. DiFsat semi Ma)or Ptle Measured Vertical Measured Verlical Rererome Christ Tonnage+ Onset Wellbore Centre CAR.,, Centre to No Go Allowable Washing Depth Depth Depth Depth A7lmuth ♦NI -8 -w-W Nose size Centre Distance Deviation loan) print (Mail junk) peek) lush) 0 josh) luck) (in) lural (.i) pu40 9,764.95 0,659.23 0,40000 7.75836 1746 1665 -27.55 1.360.65 -1,71840 9625 1391.19 135.93 128046 Pass - Major Risk 9,766.29 8658.77 8,425.00 ].]0948 17.49 1675 26.89 1,377.10 -1,728,70 9625 137901 137.19 1,7711 Pass - Major Risk 9,775.00 8655.79 8450.00 7,610.51 17.55 16.05 -2749 1.385.01 -1.739.09 9.625 1,367.31 13745 1,254.05 Pass - Major Risk 9.775.00 8.65579 847500 7,831.51 1755 16.95 -2657 1,394.39 -1.74961 9,625 1.355.03 13712 1,241.43 Pass - Major Risk 9]7500 8,65579 8.500.00 7,85257 17.55 17.04 -25.64 1402.05 -1.76009 9.625 1,344.60 137.98 1,229.W Pass - Major Risk 9,775.00 065579 8,525.00 7.87368 17.55 17.14 -24.69 1.41144 -1,77036 9,625 1,333.90 13035 1,217,22 Pass - Major Risk 9,775.00 8,65579 8,550.0 7,694.79 1755 1723 -23.72 1,420.06 -1]8062 9.625 132361 13852 1,20580 Pas. -Major Risk 9,77500 8,655.79 8.575.00 7,915.07 1]55 1733 -22.74 1,420.61 -1,79098 9.625 1,31364 13879 1,194.70 Pass -Major Risk 9,775.00 8,655.79 86000 7.936.99 17.55 1742 -21.74 1,437.25 -1,00120 9.625 1,304.17 13905 1,104.11 Pass -Major Risk 877500 8.65579 8,625.00 7,958.21 17.55 17.52 -20.73 1,445.86 -1,01122 9.625 1,295.11 139.31 1.17393 PA. - Major Risk 977500 8.655.79 8.650.00 7,97945 17.55 1761 -1970 1,454.36 -1.82130 9.625 1,286.36 139.57 1,16100 Pass - Major Risk %775 00 8,655.79 8,67500 0,00.73 17.55 17.71 -1066 146269 -1.83128 9625 1.278.09 139.83 1.15471 Pass - Major Risk 9,775.0 6,655.79 0,70000 0,022.03 17.55 17.80 -17.61 147155 -1,841.10 9625 1,27039 140.09 1,145.94 Pass - Motor Risk 9,775.0 8,655.79 0.725.00 8.04321 17.55 17N -16.54 148032 -1,851.06 9625 1,26334 140.36 1137.72 Pass - Major Risk 9,775.0 0,655.79 8,750.00 8.064.38 17.65 17.95 -15.46 148908 4,861.67 9,625 125654 140.50 1.13008 Pass - Mayr Risk 9,78371 8,652.81 8,77500 8.00562 17.81 Ism -1$05 1,497.77 -1.87099 9.625 1.250 42 140.86 1.12249 Pass- Major ask 9784.70 0,652.44 8.80.00 8.406.93 17.52 10.04 4493 1,506.37 -1,aic" 9.625 1.244.18 140.69 1,11562 Pass. Major Risk 9.705.03 0,65267 8.825.0 8,128.28 17.62 10.05 -14.00 1,51691 -1.89063 0,625 1,238.67 14069 1,109.32 Pass - Major Risk 9,786.84 0,65174 8,850.0 8.149.67 17,63 1006 -1305 1.52343 -1,900.30 9,625 1,233.61 140.70 1,103.51 Pass - Major Risk 9,707.04 8.651.40 8,0750 8.171.0 17.64 10.06 -1209 1,531.92 4910.09 9.625 1,229.02 140.70 1,098.19 Pass - Major Risk 9,788,81 8,651.06 11.90000 8,19253 V,14 10.07 -11.11 1,540.39 -1.919.76 9.625 1.224.89 140.71 1.093.37 Paz.. Major Risk 9.709]6 865074 8.925.00 8,214.0 1765 10.08 -10.13 1.548.83 -1.92940 9,625 1,221.25 140.74 1,009.03 Paz. - Major Risk 9,790.69 8,65042 8950.0 8,23549 1168 18.10 9.13 155724 4,930.99 9.625 1,210.00 140.76 1,005.21 Pass - Major Risk 9,79160 8,650.11 8,975.00 0,257.01 Vat 18.11 -9.12 1,56563 -1940.55 9.625 1,215.39 14079 1,001.91 Pass - Major Risk 9800.2 8,60.24 9,000.00 927sW 1773 18.12 -840 1,574.00 1,95808 9,625 1,21327 140.70 1,07895 Pass - Major Risk 9,00000 860.24 9,02500 8,300.14 17,73 18.15 723 1582.35 1,967.55 9,625 1.211.57 140.76 1,076.71 Pass - Major Risk 9,800.00 8,647.24 9,05000 6,321.75 17.73 18.17 -6.05 159071 -1,976.94 9625 1,210.40 14062 1,075.04 Pass - Major Risk 9,80.00 8,647,24 9,075.00 8343.30 17.73 18,19 -4.08 1,59909 -1,90637 9625 1,209.77 140.88 107395 Pass - Major Risk 980.0 0,647.24 910000 8.36504 1773 11121 -370 1,60747 -1,995.52 9.625 1,209.60 140.95 1.07344 Paris- Major Risk. CC. ES, SF 9600.0 8,647.24 9.12500 8,38672 1773 1824 -2.52 1.615.85 -2,004.72 9,625 1.210.12 141.03 1.07347 Paris - Major Risk 9,800 00 8,64724 9.15000 840842 17.73 10.28 -1.35 1,62414 -2.013.67 9.625 1.211.08 141.12 1,07407 Pass - Major Risk 9.80000 8,84724 9.17500 6430.14 17.73 1031 -0.17 1,832.62 -2.022.90 9625 1.21256 141.20 1,07522 Pass - Major Risk 9.800.00 8,8224 9,20.00 845168 17,73 10.34 1.0 1.64100 -2.032.05 7812 1.21456 141.14 1,077.09 Pass - Major Rok 9,000.00 8.647.24 9225.0 8.47365 17.73 10.30 2.17 1.849.36 -2.041.05 7.812 1,217.06 141.25 1,079.33 Paas - Major Risk 9,000.00 8,6224 9,250.0 8.49547 17.73 18.42 333 1.657.69 -2,049.67 7.812 1,22008 141.37 1082.10 Pass - Major Risk 9800.00 8.647.24 9,27500 0,517.34 1773 10.47 449 1,666.00 .2.056.77 6.937 1,223.56 141.41 1,085.47 Pass - Major Risk 9,800.00 8,60.24 9,30000 8,539.26 1773 10.51 5,84 1,674.27 -2.067.49 6.937 1.M7,64 141.53 1,00930 Pass - Major Risk 9,00000 8,43,17 24 9,325.00 0,561,20 1773 18.55 6.78 1,60265 -2076.08 5,625 1232.14 14155 1,093.80 Pass - Major Risk 9,00000 864724 9,350.00 6,503.11 17.73 10.81 7.91 1,691.26 2,004.48 5,625 1,23749 141.67 1,099.15 Pass - Major Risk 9,800.00 8,647.24 9,375.00 0,605.01 1773 1865 902 1.700.10 -2,09270 5,625 1,243.58 14180 1105.19 Pass - Major Risk 9,800.00 6,647.24 9,40000 0,626.07 17.73 1870 10.13 1,709.16 -2,100.74 5.625 1,250.39 14192 1.11199 Pass - Major Risk 9,800.00 6,647.24 9,425,00 0,640.74 1773 1876 1122 1,710.32 -2,10887 5.625 1,257.79 142.07 1,11938 Pass - Major Risk 9,80.00 0,547.24 945000 8.670.62 17.73 18.82 1229 1,727.46 -211859 5.625 1,28561 14212 1,127.24 Pass - Major Risk 9.80) 00 0,647.24 9,475.00 8,69253 17.73 1868 13.36 1,736.57 -2,12447 5625 1.273.86 14237 1.135.55 Pass - Major Risk 9,90000 0,647,24 9.50.00 8.71445 17.73 1524 1441 1,745.65 -2,13234 $625 1,282.51 14252 1.14431 Pass - Major Risk 9.800.00 8,64724 9,525.00 8.73639 17.73 1901 1544 1.754,72 -2,140.17 5,625 1,291.59 142.70 1,15349 Pass - Major Risk 9.800.00 8,647.24 9,550.00 8,75883 17.73 19,08 16.46 1.76382 -2,147.98 5825 1,301,12 142.88 1.163.14 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1:02:42PM Page 4 COMPASS 5000.1 Build 81B b BP FeA II p Travelling Cylinder Report HUGHES Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB R Pad Site Error. 0.00 usft Reference Well: R-28 Well Error: 0.00 usft Reference Wellbore R -28A Reference Design: R -28A WPO/ Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCPt Offset Datum Offset Design PB R Pad - R-02 - R-02 - R-02 Mae am Error. 0,00 use Survey Program: 100-GYGOLCMS, 080"OSs-GYRO Rule Assigned: Major Rak Men Wall EMd: 000 us8 Reference Me Saml Major Axis Measured Vertical Measured Vertical Reference West Turner.. Met Wounder, Centre Cosi,- Centre to No Go Allowable WamNs DepN Depth Dnu, Njob Azimuth ♦M.3 +V.W How aide Centre Distance Deman (matt) (ura) (ura) (User) man (..ft) (°) (maftl Juan) (n) loan) (man) (user) 9,800.00 0647.24 9,67500 8,78027 17.73 19.15 17.47 1,772.94 .2,15$76 5625 1,31108 143 US 1, 173.25 Pass Major Risk 9,800.00 8,64724 9.600.00 8,802,21 1273 1923 18.46 1,702.00 -2.163.50 5.625 1,32145 14724 1,18301 Pass - Major Risk 9.800.00 8.647.24 9.625.00 8.824.15 17,73 1831 1943 1,79123 -2,171.23 5625 1,332.24 143.44 1.194.78 Pau - Major Risk 9,800.00 8.647.24 9,650.00 8.846.10 17.73 1939 2039. 1.80039 .2,170.95 5.625 1,34341 14364 1,206.13 Pass Major Risk 9,800.00 8.647 24 9,67500 8,988.04 17.73 1947 21.33 1.009.56 .2.18867 5625 1,35496 143.84 1,21773 Pass Major Risk 9,800.00 8.6424 9]00.00 8,809.98 17,73 1955. 22.25 1.010.74 2.194.30 5,625 1.366.80 144.04 1.229.72 Pass - Major Risk 9.800.00 8.647.24 9]25.00 8,911.91 17,73 1964. 23.16 1,827.94 -2,202.07 5,625 1,379.16 10.26 1.242.09 Pass. Major Risk 9,80000 8,647.24 9,750.00 0,933.04 17.73 19.73 24.05 1.37.17 -2,209.75 5.625 1,391.03 114.48 1.254.05 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2//2017 1:02: 42PM Page 5 COMPASS 5000.1 Build 81B Offset Design PB R Pad - R-02 BP reA.g byTravelling Cylinder Report BAKER orcein are Enor, 0.00ua8 HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB R Pad MD Reference: ORIG KELLY BUSHING @ 51.20usft Seml MajorAal. (DOYON 16) Site Error: 0.00 usft North Reference: True Reference Well: R-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore R -28A Database: EDM R5K-Alaska PROD -ANCPI Reference Design: R -28A WPO8 Offset TVD Reference: Offset Datum Offset Design PB R Pad - R-02 - R -02A - R -02A WP10 orcein are Enor, 0.00ua8 Survey Pro92m: ll0.GYD-CT-CMS, 8724 BOSS-G(RO, 91 Rule As.i9ne0: Mayor Risk asset Well E.: 0,0[i RasereMe OrcaM Seml MajorAal. Measured Veelcal Measara6 Vertical Rafaenm Cesar TooBacee Osaet Welleora Oemn Casing- Centre to No Go Alloxrebie vitamins Depth Depth Caput Death ".1,11h aNl3 +ERV Hae Sias Camra Dntanca D.yla6an join) (daft) (.R) loan) (.an) (usft) PI (uaR) lose) pn) (usft) (-ft) (uatt) 9,625.00 0.707.09 10.96920 6,631.11 16.67 3,64442 29.73 1.378.74 -1,555.13 6.937 1,14707 10728.73 -9.513.15 FAIL- Major Risk, CC, ES, SF 9,63794 8702.66 10,950.00 8,63107 1673 3,41884 27.04 1391.92 -1,566.80 6.937 1.153.22 10,01145 -8,860.69 FAIL - Major Risk 9,650.00 6,699.54 10,875.00 8630.92 1879 2,55526 2704 1.44637 -1,610.35 6.937 1,17269 7,454.41 -8219.07 FAIL - Major Risk 9,650.00 6690.54 10900.00 8,630.97 16.79 2,837]6 26.62 1,429.13 -1,600.25 8.937 1,167.03 8,282.36 -7,097,41 FAIL - Major Risk 9650.00 8.698.54 10,92500 8,631.02 1679 3,12493 26.20 1,41096 -1,583.00 6.937 1,160.61 9,11250 -7,982.75 FAIL - Major Risk 965481 8.693.64 10.850.00 8,630.67 1686 227768 2501 146264 1,637.33 6.937 1.177.27 6,567.84 -5,37334 FAIL - Major Risk 9675.00 8,689.99 10,800.00 8,63077 16.92 1.74055 24.01 1492.72 4.677.26 6.937 1.184.68 assess -3,66557 FAIL - Major Risk 9,675.00 6,58999 10,825.00 8,630.02 16.92 2,005.74 23.60 1,477a9 -1.657.13 6937 1,191.07 5,702.36 -4,52349 FAIL - Major Risk 9,684.25 81688.03 10,77500 8630]2 16.97 1,481.74 22.04 1.50853 -1,696.62 6.937 1.189.90 4,001.04 -2.855.08 FAIL Major Risk 9.69068 9.684.63 10,75000 8,63067 17.00 1228.61 22.15 1,525.32 -1.715.14 6.937 1,196]6 3,310.96 -2,07268 FAIL - Major Risk 9.700.00 8,68144 10,70000 9.630.56 17.06 737.38 21.34 1,561]1 -1.749.40 6.937 1,21525 1,800.92 -60696 FAIL Major Risk 9,700.00 8.681.44 10,72500 8.630.62 17.06 990.58 20.95 1,54310 -1,732.74 6,937 1.205.24 2,585.18 -1.328.11 FAIL Major Risk 9,70933 8,678.25 10.65000 8,530.45 17.11 27042 2047 1.60147 4,77967 6.937 1.239.72 504.07 711.94 Pass - Major Risk 9.70933 9,678.25 10.67500 8.630.51 17.11 499.38 20.11 1,581.19 4765.05 6.937 1.226.75 1.205.56 57.64 Pass - Major Risk 971968 6,674.71 10.62500 863040 17.18 103.26 1904. 1,62249 -1783.21 6.937 1.253.99 267.79 1010.88 Pass - Major Risk 9,725.00 8.67289 10,575.00 8.631.51 1721 184.53 10.02 1168590 -1,817.95 6,937 1,20545 630.08 65045 Pas. - Major Risk 9.72500 8.672.09 10,60000 8.63043 1721 200.44 1046 1.8 14 -1.805.70 6,937 126952 682.61 58994 Pass - Major Risk 9,73399 8.659.01 10.550.00 8.633.90 17.27 17977 1168 1,88758 -1,830.16 6,937 1,30146 623.98 67980 Pass - Major Risk 9,73830 9.650,34 10.52500 8.637.58 17.30 176.80 17.39 1.709.12 -1,842.30 6937 1.317.50 81580 70426 Pass - Major Risk 9]5000 8,664.34 10.425.00 885670 17.37 16825 17.24 1394.59 489043 6937 1,30365 59054 79595 Pass - Major Risk 9,750 OD 8,654.34 10450.00 8,653.20 17.37 171.11 1684 1773.03 4.87828 6937 1,365.62 59845 77045 Pass - Major Risk 9350.00 9.664.34 10.475.00 8.64840 17.37 173.18 16,38 1751.65 -1,866.24 6937 1.350.01 604.13 74752 Pass - Major Risk 975000 8.664.34 10,500.00 8.64256 17.37 174.05 15.87 1,730.47 4,85432 6,937 1333.82 60872 726.11 Pan - Major Risk 9784.94 8.659.23 8,400.00 176836 1140 1665 -27.56' - 1,36865 -171840 9.625 1.391.19 136.93 1280.46 Pass - Major Risk 976629 8,656.77 8,425.00 778948 17.49 16.75 -28.69 1377.18 .172870 9625 1,379.01 137.19 1.267.11 Pass - Major Risk 9.77500 8.655.79 845000 7.81051 17.55 16.85 -2149 138581 .1739.09 9,626 1,367.31 137.45 1.25405 Pas. - Major Risk 9.775.00 0,655.79 8.47500 7,831.51 17.55 16.95 -26.57 139439 1749.61 9,625 1355.83 13172 1,24143 Pass - Major Risk 9,775.00 8,65579 8.50000 7,652.57 17.55 17,04 -25.64 1,40285 476009 9.625 1.344.60 137.98 1,22906 Pass - Major Risk 9,775.00 6,655.79 8.52500 7.07368 17.55 17.14 2669 1,611.44 -1.770.36 9625 1.333.90 138.25 121722 Pass - Major Risk 9,775.00 0,655,79 8,55000 7.89479 17.55 17.23 -23.72 1,420.06 -1.70062 9625 1,32861 13852 1.205.80 Pass - Maj, Risk 9,775.00 0,65579 8,575.00 7,91587 17.55 17.33 -22.74 1428.61 -1,790.98 9,625 1,31964 13879 1.194,70 Pass - Major Risk 9,775.00 0,65579 6,60000 793699 17.55 17.42 -21.74 1,437.25 -1,00120 9625 1,304.17 139.05 1.184.11 Pas. - Major Risk 9.775.00 8.65579 8,825.00 7,956.21 17.55 17.52 -20.73 1445.05 -1,011.22 9,626 1,295.11 13931 1.17393 Pass Major Risk 9,775.00 8,65579 0,650.00 7,979.45 17.55 1161 -19.70 1454.38 -1,021.30 9.625 1,205.38 139.57 1.164.08 Pass - Maj, Risk 9,775.00 885579 0,67500 8,907.73 17.55 17.71 -1866 1.462.09 -1,83128 9.625 1.270.09 13983 1,164.71 Paas - Major Risk 9,775.00 0,655.79 6,700.00 0.022.03 17.55 17.80 -1761 1,471.55 1,041.10 9625 1,270.39 14009 1,145.94 Pan - Major Risk 9,775.00 0.65579 6,725.00 0.043.21 1755 17.90 -16.54 1,480.32 -1.05106 9625 1,263.24 140.36 1,13772 Pau - Major Risk 9,775.00 8,65579 0750.00 0.06430 17.55 17.95 -15.46 1,409.00 -1,661.06 9.625 1.256.54 14050 1,130.08 Pass -Major Risk 9.78371 0,85281 0,775.00 0.08562 17.61 18.00 -15.85 1.49737 -187099 9.625 1.250.12 140.68 1,122.49 Pan - Major Risk 9784.78 0.65244 0,900.00 0.107.93 1762 18.04 -14.93 1,506.37 -1,00084 9625 1,244.18 140.69 1,11562 Pass - Major Risk 9705.03 0.65200 0,825.00 8,128.28 17.52 18.05 -1400 1,514.91 -1.89063 9625 1,238.67 14069 1,10932 Pass - Major Risk 9786.64 8,65174 8,850.00 8149.67 17.63 1806 -13.05 1.523.43 -1.900.30 9625 1,23361 14070 1,10351 Pass - Major Risk 9,707.84 8.65140 0,875.00 8,171.08 17.64 18.06 -12.09 1531.92 -1.91009 9625 1.22902 14030 1090.19 Pass - Major Risk 9.700.81 8651.06 0,90000 0,192.53 17.65 1&07 -11.11 1.540.39 -1.919.76 9625 1,224.89 14031 1,093.37 Pass - Major Risk 9.78975 8,65074 0.925.00 8214.00 1765 1809 -10.13 1.548.83 -1,929.40 9,625 1 221 25 14034 1,089,03 Pass - Major Risk 9,79069 885042 0.95000 0,23549 1166 10.10 9.13 1,557.24 -1,930.99 9,625 121808 14036 1,085.21 Pass - Major Risk 9,791.60 8650A1 8.975.00 8,257.01 1167 15.11 8.12 1.565.63 -1.940.55 9,626 1,21539 14039 1,081.91 Pass - Major Risk CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 21612017 1:02:42PM Page 6 COMPASS 5000.1 Build BIB . bBP p Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore R -28A Database: Reference Design: R -28A WPO8 Offset TVD Reference: FORM BAK HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design Pa Pad - R-02 - R -02A - R -02A WP10 What SAB E. 0.00 ush Survey Program: IMGYD-CT-CMG, 0724 -BOSS -GYRO, 9200. Rule tuera,ed: Major Risk Onset Vasil Errors 000 pan Reference Oeut Seat MMorA.is Measured VMpe.1 Measahad Vertical Reference must Teolrace• West Wellbore Centre Deaths- Centre to wase AlbvnCk Warning Depth Depth Depth Depth Azimuth AV3 r m Role 81m Centre Distance Deviation pen) lush) (okoh Juan) hisft) than) 19 (use) loan) (in) loam luenl (Us") 9,000.00 8.647.24 9,000.00 8,270.56 1173 10.12 -8.40 1.57400 -1.95500 9625 1213.27 140.70 1,078,95 Pass - Major Risk 9.800.00 8.647.24 9025.00 8,300.14 1173 18.15 -7.23 1,582.35 -1.967.55 9.625 1,211.57 14076 1,076.71 Pass - Major Risk 9.800.00 8M724 9050.00 8,321,75 17.73 10.17 405 1,59071 -1,976.94 9.625 1,21040 140.82 1,075.04 Pass - Major Risk 9,000.00 8.647.24 9,07500 8.343.30 1173 10.19 4.80 1.599.09 -1,986.27 9.625 1.209.77 14088 1,07395 Pass - Major Risk 9.800.00 8.60.24 9,100.00 8.365.04 1173 18.21 -3.70 1,60147 -1.995.52 9,625 1,209.86 140.95 1,07344 Pass - Mayr Risk 9.800.00 8,647,24 9,125.00 8,386]2 1173 1524 -2.52 1,615.65 -2,004.72 9625 1.210.12 141.03 1,07347 Pass - Major Risk 9.800.00 8.647.24 9,150.00 9,40542 17.73 18.20 -1.35 1,624.24 -2,013.87 9,625 1,211.00 141.12 1,074.07 Pass - Major Risk 9,800.00 5647.24 9.175.00 8.430.14 1713 18.31 -0.17 1.832.82 -2,022.96 9.625 1.212.56 141.20 1.07522 Pass - Major Risk 9,80000 8.647.24 9,200.00 8.451.08 1773 18.34 1.00 1.641.00 -2,03205 7.812 1,214.55 141.14 1,07109 Pass - Major Risk 9,800.00 8.64124 9,225,00 8,473.65 17.73 18.30 2.17 1,649.36 -2,041.05 7,812 1.21105 14125 1,079.33 Pass - Major Risk 9.800.00 8.647.24 9.250.00 849547 17.73 18.42 3.33 11857.69 -2,049.96 7.812 1.220.06 141.37 1,002.10 Pass - Major Risk 9.800.00 8,647.24 9,275.00 8,517.34 1173 18.47 449 1.666.00 -205577 6.937 1.223.56 141.41 1,005.47 Pas. Major Risk 9.800.00 8,647.24 9,300.00 8,539.26 17.73 18.51 5.64 1,674.27 -2067.49 6,937 1,227.54 141.53 1,089.30 Pass - Major Risk 9,800.00 8.647.24 9,325.00 91561.20 17.73 18.56 0.78 1,66265 -2,076.08 6,937 1,232.13 141.65 1,093.77 Pass - Major Risk 9.800.00 8.647.24 9,350.00 8.503.12 17.73 1961 7.91 1,091.25 -2,084.49 6.937 1,237.40 141.78 1099.03 Pass - Major Risk 9,800.00 8,647.24 9,375.00 8.605.02 1173 18.65 9.02 1.700.00 -2,09289 6.937 1,243.57 141.90 1,105.07 Pass - Major Risk 9.000.00 8,647.24 9,40000 8,626.03 17.73 18.70 10.13 1709.19 @.100 e2 6.937 1,250.41 142.01 1111.92 Pas. - Major Risk 9.800.00 8,647.24 9.425.00 8.647.60 1173 18.74 11.20 1,719.35 -2.10984 6937 1.256.59 142.11 1.120.17 Pass - Math Risk 9.800.00 0.647.24 9.45000 8,666.52 17.73 1500 12.19 1.731.70 -212081 6,937 I'vako1 142.25 1.130.60 Pass - Major Risk 9.800.00 8.647.24 9,475.00 8,602.52 17.73 18.90 13.09 1,746.05 -2133.55 6.937 1,281.44 14247 1, 143.20 Pass - Major Risk 9.810.00 8.643.51 9,500.00 8.695.41 17.01 1904 11.09 1]82.04 -2,147.75 6.937 1.28537 142.57 1,156.73 Pass - Maier Risk 9.814.54 8.642.26 9.525.00 8.704.90 17.04 1929 12.00 1,779.32 -2,16309 6.937 1.310.62 14303 1,171.70 Pass - Major Risk 9,825.00 6638.69 9,550.00 8,710.76 17,91 19.77 10.60 179747 -2,17921 6.937 1,326.76 143.78 1,188.62 Pau - Maier Risk 9.825.00 0.638.89 9575.00 6,71208 17.91 2102 mol 1816.00 -2,195.73 6.937 1.343.21 146.48 1,201.15 Pass - Major Risk 10.356.26 8.593.00 9,600.00 8.711.15 23.50 19.05 3337 1834.72 2212.28 6.937 1.35790 166.57 1,196.43 Pass - Major Risk 10,375.00 8,593.00 9,62500 8.705.78 23.61 18.81 32.08 185303 -2228A0 6.937 1.366.01 16625 1,206.61 Pass - Major Risk 10,375.00 8,593.00 9,650.00 8.699.58 23.01 18.74 31.77 1872.84 -224228 6.937 1.37571 166.05 1,21164 Pass Major Risk 10,375.00 8,50,00 9,675.00 8.693.68 23.61 1016 31.49 1,89468 225297 6.937 1,391.02 166.12 1,231.05 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1:02r42PM Page 7 COMPASS 5000.1 Build BIB .N BP pTravelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 usit North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore R -28A Database: Reference Design: R -28A WP08 Offset TVD Reference: Vias BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB R Pad - R-14 - R-14 - R-14 orae sae Emp: o.DD use Survey Program: 10613013SGYRo Rule Asaigne@Minor 1110 01hudwellEmp: O.OD has Reverence OMeet 8eml Major Asia Measured Verllcal Measured vertical Reference Ofieat Toolrace♦ OXaet Wellbore CNrtre Casing- Cenral. No Go Allowable blaming Depth Depth Depth Depth AHmush eNI-5 eVM Hine Sim Centre Distance Deviation (uaa) (u.n) (u.a) loan) (uau) (uaal 1°I haul Delia (in) less) Ural) haat) 9950.00 8,602.07 8600.00 7,567.66 1894 146.23 90.50 36300 2,280.67 6250 1,070.40 11.14 1.069.80 Pass-Minort/10 9,950.00 8.602.07 8625.00 157857 1894 14).00 -9079 361.01 2,294.27 6.250 1.047.77 11.14 1.04725 Pass - Minor t/10 9.950.00 8,602.07 8,650.00 7,59939 1894 147.76 -9109 360.10 2.300.01 6.250 1.025.31 11.14 1,024,79 Pass -Minor 1/10 9,950.00 0.602.07 0.87500 7.620.11 1894 148.52 -9141 358.59 -2.321.91 6250 1,003.05 11.14 1,002.53 Pass - Minor 1/10 9,96061 0,600.18 0,)0000 7,64073 1804 149.20 -9124 36703 2,335.95 6250 900.01 1105 98029 Pass - Minor 1/10 9,964.09 8,599.60 0]2500 7,68125 19.08 150.09 -9142 355.51 -2,350.16 6.250 95802 1101 950.30 Pas. - Minor ilio 9,975.00 8.597.% 0,75000 7,68189 19.18 150.90 -9128 354.03 -2.364.49 6.250 937.10 10.91 936.58 Pass - Minor t/10 9.975.00 0597.95 8,775.00 7,702.01 19.18 151.71 -8186 352.59 -2,370.97 6.250 915.43 10.91 914.91 Pass - Minor 1/10 9,975.00 8.597,96 8.80000 7.722.24 19.18 152.53 -9205 351.18 @,393.59 6,250 89400 10.91 09340 Pass - Minor 1/10 9.975.00 8.59]96 8,825.00 7.74237 19.18 153.39 -9248 349.80 -2400.35 6.250 072.04 10.91 87282 Pass - Minor 1/10 9.903.92 8.6911 8,850.00 7,762.40 1927 154.25 -8249 Uses -2.423.25 6.250 851.84 10.83 851.32 Pass - Minor 1/10 9,90842 8.596.26 0875.00 7.782.32 1931 155.11 -9275 347.10 -2.430.29 6250 831.13 10.79 830.61 Pass - Minor 1/10 10,000.00 8.59508 8.90000 7,802.14 19.42 155.98 -9272 Us 78 2,453.47 6.250 810,75 10.67 910.23 Pass - Moor 1110 10,00000 8.595.00 8,925.00 7.821.08 19.42 15680 -9322 344.51 -2,468.76 6.250 79047 10,67 789.94 Pas. - Minor t/10 10.00000 81595.00 8,950.00 7.841.56 19.42 157.79 -93.74 34332 -2.404.13 6.250 770.50 10.87 76997 Pose - Minor 1/10 10.00831 8.584.39 8,975.00 7.11 1951 158.69 -93.93 342.22 -2.499.59 6.250 750.75 10.58 750.23 Pass - Minor 1110 10,013.77 8.591.02 &00000 ).000]4 1958 159,60 -9427 341.19 -2,515.12 8.250 731.28 1053 73076 Pass - Minor 1110 10,025.00 8,593.43 9.025.00 7,000.24 19.68 150.53 -94.41 340.23 -2,530.73 6,250 712.14 10.43 71162 Pas - Minor 1110 10,025.00 8,59343 9.050.00 7,919.70 1960 16146 -95.03 33931 -?54840 6.250 697.18 1043 69265 Pa.. - Minor 1110 10,031.38 0,593.21 9,075.OD 7,939.11 19.74 16240 -9544 330.44 -2,562.14 8.250 67457 ID38 674.05 Pass - Minor 1110 10.037.68 8.593.07 9,100.00 7,958.46 19.81 163.33 -9508 337.61 -2,57194 8.250 656.30 1032 655.77 Pass - Minor 1110 10,045.77 0.593.00 9,125.00 7,977.82 19.89 16427 -9829 336.80 -2,593.75 6.250 638.33 1025 637.80 Pass - Minor 1110 10,054.35 0.593.00 9. 150 00 7,997.21 1990 16521 -96.06 335.90 -2,60950 6250 620.60 1031 820.08 Pass - Minor 1110 10,0162 01 9,175.00 8,01664 20.10 166.15 -9557 335.15 -262521 6.250 60707 10.38 602.55 Pass - Minor 1110 1007500 0,593.00 9,200.00 0,036.11 2020 167.09 -9538 334.30 -2.640.87 4437 51 1030 505.40 Pas, - Minor 1110 10,087.32 0,593.00 @22500 8,055.62 20.33 168.01 9494 33344 -2,65648 4437 56870 10.38 580.33 Pas, - Minor 1110 10,097.95 0,593.00 9,25000 8,675.16 2044 168.93 -9480 332.56 -2,672.04 4437 551.92 10.45 551.55 Pass - Minor 1110 10,108.30 0,593.00 9,275.00 11 2056. 169.85 9479 33167 -2,687.56 3,562 53545 10.45 535.15 Pass - Minor t/10 10.11062 8,593.00 9,300.00 8,11437 2067 17077 -94.92 33076 -2,70302 3.562 $1834 10.53 51904 Pass - Minor t/10 10.12064 8.59300 9.325.00 8,13403 2078. 171.67 95.19 329.84 3.71843 3,562 50362 1062 503.32 Pass - Minor 1110 10.138.47 8,59300 9,350.00 8.153.74 2089 172.58 -9580 32894 -2.73379 3562 480.33 10.72 488.04 Pass - Minor 1110 10.150.00 8.59300 9,375.00 8,173.49 2102 173.49 8595 320.04 -2.74900 3582 473.53 1002 473.24 Pass - Minor 1110 10,15149 8.593.00 9,40000 8,19329 21.10 17439 9692 327.15 -2,764.32 3,562 459.26 10.89 45897 Pass - Minor 1110 10.16568 8.593.00 9.42500 8,213.14 2121 17520 9183 32629 -2.779.50 3.562 44580 10.98 445.30 Pass - Minor 1/10 10,17500 8,59300 9,450.00 8.23303 2130 176.17 -9900 325.44 3,794.63 3.562 43250 11.05 432.30 Pass - Minor t/10 10.10446 8.59300 9.475.00 8.252.93 21.41 171% 100.18 324.62 -2.80969 3.562 420.34 11.14 420.04 Pass - Minor 1110 10.19704 8.59300 9,500.00 8.272.94 21.50 177.95 40181 323.02 -292469 3,562 400.09 11,22 408.59 Pans- Miner 1/10 10,200.00 8,593.00 9.525.00 8292.98 2158 178.82 -103.44 323.05 -2.83962 3.562 398.33 11.28 399.03 Pass - Minor 1/10 10,20959 81593.00 9.550.00 8.313,08 21.69 17869 -105.10 322.32 4,854.47 3.562 388.71 1106 38841 Pass - Minor 1/10 10,217.56 8.593.00 9.575 DO 8.333.24 21.78 100,55 -107.10 321.62 -2,869.23 3.562 300.14 11 43 37984 Paas - Minor 1110 10.22500 0.593.00 9.600.00 0,35347 21.86 181.42 -109.32 320.95 -2.80391 3.562 372.68 1149 37238 Pas. - Minor 1110 10,232.95 0.59300 9.625.00 0.373.76 21.95 10226 .111.61 320.37 3.098,50 3.562 36640 1156 366.10 Pae. - Minor 1110 10,240.31 8,593.00 9,650.00 0.394.12 22.04 18310 -114.08 $19.07 -2.913.00 3.562 361.34 11.63 360.65 Pas. - Minor 1110 10,250.00 8,593.00 9,675.00 0,414.56 22.14 18394 -116.30 319.48 -2.92740 3.552 357.50 1173 356.12 Pass - Mine, 1110 10,254.61 0,593.00 9.700.00 8,435.06 22.20 18438 -119.35 319.18 -2,941]0 3.562 355.12 11.79 352.84 Pass - Minor 1110 10,261.52 0,593.00 9,725.00 8,455.82 22.27 lasso -122.10 310.96 -295592 3.5132 354.06 11.85 311 Pas. - Minor 1110. CC 10,268.28 8593.00 9,750.00 0,478.24 22.35 18640 -12489 310.03 -2,97005 3.562 35442 11.92 36.54 Pa..- Minor 1110. E5. SF CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation V62017 1:02:42PM Page a COMPASS 5000.1 Build 81B � PB R Pad - R-14 BP pTravelling (4,11, Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference She: PB R Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore R -28A Database: Reference Design: R -28A WPO8 Offset TVD Reference: ri.s BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING ® 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB R Pad - R-14 - R-14 - R-14 met ane Evac 0.0 elft sm's, Pro9mm: ' GooOSS-GYRO Rule Assignee: Minor 1110 OReat Wall Emo. 000 usft Relerence Was, Semi Major Axis Measured Vertical Measured Vertical Reference Onset T9olface+ Onset Wellbore Cemre c.sirp- Centre to No Go Allowable Warning Depen peen Deem Depth Azimuth eW4 +83.97 NOlesite Centre Oistanu Dzei.d.i. (usft) (sen) (un) (.an) (man) (mn) r) (mart) (man) (in) (un) lusnl (ms) 10275.00 859300 9,775.00 8,496.92 22.42 187.21 -127.67 31876 -2.904.11 3682 35621 11.99 351.54 Pass - Minor 1110 10,28134 859300 9,80000 8,517.65 2249 10802 -13045 310.77 -2,99008 3.562 35941 12.05 353.98 Pass - Minor 1110 10,29776 8.593.00 9,825.00 8538.42 22.69 188.81 -13478 31881 .3.011.99 3.562 36399 12.06 35192 Pass - Minor 1110 10,346.35 8,59300 9,850.00 8,55821 23.25 10961 -143.98 318.85 3.02587 3.562 359A0 11.90 362.69 Pas. - Mina, 1110 10401.39 0.59300 8,875.00 8.500.03 2394 19040 -153.85 318Ae -3,039.71 3.562 374.14 Was 367.55 Pass - Minor Ill 10,45253 8.593.00 990000 0,600.07 2474 191.20 164.37 31891 -3,053.52 3.562 37802 11.38 37223 Pass - Minor tll0 10.52834 8,593.00 9.92500 8,621.77 25.62 191.97 -175.30 318.95 3,087.24 3.562 382.84 1103 37645 Pass Minor1110 10,669.34 6.503.00 9.95000 8,642.75 26.16 192.74 177,41 319.02 -3.080.84 3.662 386.27 10.85 379.70 Pas. - Minor 1110 10,575.00 8.593.00 9.97500 0.663.80 26.24 193.51 175.04 31912 -3,094.32 3.562 39067 1092 30353 Pass - Minor 1110 10,584.13 8,593.00 10.001100 8,684.94 2636 19429 173.17 319.24 .3,107,67 3.562 396.31 11.02 38862 Pass - Minor 1/10 10,59142 6,593.00 10,02500 8,708.11 26.46 19505 171.16 319.30 -3.120.96 3.562 403.18 11.11 39494 Pas. - Minor 1/10 10.60D.00 0.59299 10.050.00 872728 26.57 19681 169.43 319.53 -3,13627 3.562 411.21 1121 40249 Pa.. - Minor 1/10 10,605.94 0.592.99 10,075.00 8,74643 26.65 196.57 WAS 31968 -3,147.59 3.582 420.34 1128 411.14 Pass - Minor 1110 10,613.15 0,592.98 10.10000 8,769.57 26,75 197.33 16565 319.84 -3.160,93 3,662 430.51 1136 42088 Pass - Minor V10 10.620.32 8,59290 10.125.00 8,790.74 26.85 190.08 16432 320.01 y174,24 3.562 441.83 11.44 43162 Pass - Minor 1110 10,625.00 8,592.97 10.150.00 8.81194 2692 190.04 16262 320.21 -3.18748 3562 45366 11.50 443.27 Pass - Minor 1110 10,634.42 8.592.% 10,175.00 8.833.19 2705 19959 161.62 32043 -3.20065 3.562 46649 11.61 45581 Pass - Minor 1110 10.64135 8,592.95 10,20000 0.854.49 27.14 200.35 160.44 32087 3,213]4 3.582 480.09 1171 469.13 Pa. - Minor 1110 10.85000 8,592.94 10,225.00 8075.02 27,26 201.09 159.50 32095 -3,M6.78 3.582 494.38 1183 483.19 Pass - Minor 1110 10,65500 8,59293 10,250.00 8897.17 27.33 201.82 15840 32128 -3,239.77 3.562 509.29 WeD 49785 Pass - Minor 1110 10,661.72 8.59292 10,275.00 8,918.56 27.43 202.56 157.54 321.67 -3.252.71 3.562 52677 11.99 513.12 Pass - Minor 1110 t0.66&M 8.59291 10,30000 8,939.96 27.52 20130 156.77 322.11 -3,28560 3.562 540.70 1208 52895 Pass - Minor 1110 10,875.00 8,59289 10.325.00 8,96141 27.62 204.03 158.09 32261 327846 3.562 557.27 12.17 645.20 Pass - Minor 1/10 10.601.53 859288 10.35000 8982.85 27.71 204,76 15549 323.14 -3,29130 3.562 574,21 1226 58207 Pass - Minor 1/10 10.600.02 0,592.67 10.375.00 9,00430 27.00 20549 15498 32371 -3,304.14 3.562 591.57 12.35 57929 Pass - Minor 1/10 lessees 0.59285 10400.00 9,02575 27.09 205.23 154.55 32431 -3,3t6.96 3562 609.30 1244 596.90 Pass - Minor 1/10 10,700.00 8.592.04 10,425.00 9.047.20 27.97 206.90 154.08 324.% -3.329.79 3582 627.37 12.51 614.86 Pass - Moor elle 10,70722 8,592.02 10450.00 9.01 28.07 207.70 15389 325.65 -3,342.65 3562 645.75 1260 633.15 Pass - Minor 1110 10.71354 8.592.80 10475.00 9,090.03 28.16 208.44 15306 326.38 -3,355.54 3,562 66441 1260 651,73 Pass - Minor 1110 10,71983 8.592.79 10,500.00 9,11142 28.25 209.18 15349 32715 -3,36847 3.562 88334 12.76 570.57 Paas -Minor 1110 10,72500 8.592.77 10,525.00 9.13279 28.33 209.55 153.25 327.94 -3.30142 3.562 70252 12.83 68967 Pass - Mina, 1110 10.73226 8.59275 10,550.00 9.154.16 2843 209.93 153.31 32873 -3.394.36 3.562 721.95 12.92 709.05 Pass - Minor 1110 10.738.38 8.59273 10,575.00 9,175.53 28.51 21030 153.29 32962 -3.407.31 3.562 74162 12.99 72865 Pass Mina, 1/10 10,74323 8,592.72 10,595.00 9.19263 28.50 21080 153.30 33015 -3,417.66 3.582 757.51 13.05 74450 Pass - Minor 1110 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1:02:42PM Page 9 COMPASS 5000.1 Build 81B 1 � BP bs,. p Travelling Cylinder Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 raft North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore R -28A Database: Reference Design: R -28A WPO8 Offset TVD Reference: ri.I BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usR (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Offset Design PB R Pad - R-14 - R -14A- R -14A Omer Sia Error: too um Survey Program: 10060Ss-GYRO, 9885 -MM Rule Assignee; Mlnar111D wast Well Error: 0.00 usft Rehnios Most earn Major mi. Mansund Vntlsal Maisons! Vesical Parini oewt Rings,. Dean Wallboraciii casing- Centra to NOGo Allowable Warning Depth Depth Down Depth Aalmutb aWS aP.W Hole Sue Centre Distance Deviation lusR) (oan) leas) (ush) lural loan) r) )reit) Isom (in) ii (.,ft) Igm) 995000 0,602.07 8,60000 7,55766 18.94 14623 -90.50 36340 -22808] 6.250 107040 11.14 1069.08 Paae - Minor 1/10 9,950.00 860207 8.625.00 2,5)0.57 18.94 147.00 -079 351.81 -2,294.27 8.250 1047]) 11.14 1.047,25 Pass - Minor 1/10 9,950.00 0,602.07 885000 7,59989 18.94 147,76 -9109 380.18 -2308.01 6.250 1,025.31 11.14 1,024,79 Pass - Mina, 1/10 9,950.00 8,602.07 8,675.00 7.620.11 1894 140.52 9141 358.59 -2,321.91 6.250 1,003.05 11.14 1.0253 Pass - Mina, 1110 9.96081 01800.10 8,700.00 2.640.23 1904 149.28 9124 352.03 -2.33596 6.250 900.81 11.05 980.29 Pass - Minor 1/10 9,964.09 0,59960 8,725.00 2,681.25 1908. 150.09 -9142 355.51 -2,350.16 6350 95882 11.01 95880 Pass -Minor 1/10 9,92500 0,597.96 8,75000 7,681.60 1918. 150.90 -9128 354.03 -2,36449 6.250 932.10 1091 936.50 Pass - Minor 1/10 992500 8.592.96 8,27500 2.702.0 1918. 151.21 91.66 352.59 -2,37992 6.250 915.43 1091 914.91 Pass - Mina, 1110 8975.00 8,592.96 8,0000 2.22224 1918. 152.53 9205 351.18 -2.393.59 6.250 894.00 1091 093.48 Pass - Minor 1/10 9.92500 0.592.96 8825.00 2,742.37 1918. 153.39 -92.46 me 80 -2,40835 6.250 022.04 10.91 82282 Pass - Minor 1/10 9,983.92 8.596.29 8,85000 2,26240 1927. 154.25 9249 34844 -2,423.25 6.250 051.84 1083 051.32 Pass - Minor 1/10 9.98842 8,596.26 8,0750 2,78232 1931. 155.11 9275 347.10 -2,438.29 6.250 031.13 1029 630.81 Pae. - Mina, 1110 10000.00 8.59500 0,90000 2.002.14 19.42 155.90 9272 345.20 -245342 6.250 810.75 10.62 810.23 Pass - Minor 1110 10.000.00 8,59508 8,925.00 2.021.80 19.42 156.80 93.22 344.51 2.48876 6,260 290.47 10.67 289.94 Pass - Minor 1110 10.00000 8,59508 6,9500 2,841.55 19.42 152]9 -9354 343.32 -2,404.13 6,250 770.50 10.67 269.92 Pass - Minor 1/10 10,008.31 8.594.39 8,97500 2,061.18 19.51 158.69 -93.93 342.22 -2,499.59 6.250 250.75 1058 250.23 Pass - Minor 1110 10,013.22 8,594.02 9,00000 2.98074 less 15960 -94.22 341.19 -2,515.12 6.250 231.20 10.53 23076 Pass - Minor 1110 10,02500 8,59343 9.025.00 2.900.24 19.68 160.53 -94.41 340.23 3.530.73 6.250 21214 1043 211,62 Pass - Minor 1110 10,02500 0,59343 9,050.00 2,919.20 1968 16145 -95.03 339.31 -2.546.40 5,250 69318 10.43 692.65 Pass - Minor 1110 10.031.30 0,59321 9,07500 2,939.11 19.24 16240 -95.44 33844 -2.562.14 - 6.250 67457 10.38 674.05 Pass - Minor 1110 10.032.68 8,59307 9,10000 2,959.48 19.01 163.33 -95.06 337.61 -2,527.94 6.250 656.30 10.32 655.22 Pass - Minor 1110 10,045.22 8,593.00 9.12500 7,977.02 19.09 164.27 -96.29 336.80 -2593.75 6.250 63833 10.25 637.80 Pass - Minor 1/10 10054.35 6,593.00 9,150.00 2.997 21 19.98 16521 -96.05 33598 -2609.50 6.250 62060 10.31 620.08 Pa., - Minor 1110 10,065,52 8,593.00 9.175.00 9,016.64 20.10 166.15 -9557 335.15 3.625.21 6.250 60307 10.38 602.55 Pass - Minor 1110 10.025.00 8,593.00 9,200.00 6,036.11 2020. 162.09 -9538 33430 3,640.02 4.432 585.22 10.30 585.40 Pass - Minor 1110 10.08732 0,593.00 9.22500 8.055.62 2033 168.01 94.94 33344 265648 4.432 56e20 10.38 568.33 Pass - Minor 1110 10,092.95 0,593.00 9,25000 8.075.16 2044. 168.93 94.80 332.56 3672.04 4.437 55192 1045 551.55 Pass - Minor 1110 10,10B.38 0.59300 9,276.00 8.M.75 2055. 189.05 -9429 331.67 -2.687.56 3.562 535.45 1045 535.15 Pass - Minor 1110 10,118.62 0,59300 9,30000 8114.32 2067 120.77 94.92 330]6 -2.703.02 3.562 51934 10.53 519.04 Pass - Minor 1/10 10.128.64 0,593.00 9,32500 0,134.03 2078. 12167 -95.19 32984 -2,210.43 3.562 50362 10.62 503.32 Pass - Minor 1/10 10,13842 8,593.00 9,35000 8.15374 20.09 W2.50 -9560 32894 -2,733,79 3.562 488.33 10.72 480.0 Pass - Minor 1110 10,15000 859300 9,375.00 a.17349 21.02 123.49 -95.95 32804 -2,249.08 3.582 423.53 10.82 47324 Pa.. -Minor 1110 10157,49 0,59300 9,400.00 8.193.29 2140 124.39 -96.92 327.15 -2264.32 3562 459.26 10.89 450.97 Pass - Minor 1110 10.166.60 0,593.00 942500 8,213.14 21.21 17526 -97.03 32629 -2229.50 3.562 445.80 10.98 445.30 Pass - Minor 1110 10.1750D 8.593.00 945000 9233.03 21.30 128.17 -99.00 325.44 -2,29463 3.562 43280 1105 432.30 Pass - Minor 1/10 10,184.46 0,593.00 9475.00 8,252.98 21.41 177.05 -100.18 32482 -2.80969 3.562 42034 11.44 420.04 Pass - Minor 1/10 10,19304 0,593.00 9,50000 0,222.94 21.50 122.95 -10164 32382 -282469 3.562 40888 1122 400.59 Pass - Minor 1/10 1020000 8,59300 9,52500 829298 21.50 128.02 -10344 32305 -2.83962 3,562 39833 11.28 390.03 Pass - Minor 1110 1020959 0,59300 9.55000 8.313.00 2169 17969 -105.10 322.32 -2.85447 3.582 38821 1136 38041 Pass - Minor 1110 1021756 0.59300 9,52500 8.333.24 21.78 18055 -102.10 321.62 -2869.23 3.562 390.14 1143 379.84 Pass - Minor 1110 10.225.00 0,593.00 9160000 9,353.42 21.06 18142 -10932 320.96 -2.883.91 3.582 37288 11.49 37238 Pass - Minor 1110 10232.90 0,59300 982500 9.32336 21.95 18226 111.61 32037 -2.890.50 3.562 38540 11.56 366.10 Pass - Minor W10 10,240.31 0,593.00 9.65000 8384.12 22.04 183.10 -114,08 31987 -2.913.00 3.562 36134 11,63 360.65 Pass Minor 1/10 10,250.00 8,59300 9.67500 8.41/56 22.14 183.94 -11638 31948 -2,92740 3.562 357.58 11,73 358.12 Pass - Minor 1/10 10,254.61 8,59300 9,200.00 643508 2220 184.78 -119.35 319.18 3,941.70 3.562 355.12 1178 352.04 Pas. - Minor 1/10 10.261.52 8.59300 9,72500 845562 2222 195.59 -122.10 318.96 -2955.0 3562 354.06 11.85 35099 Pass - Minor 1/10. CC 10,26825 8,59300 9,25000 8.42624 2235 19540 -124.89 31083 .2,970.05 3582 35442 11.92 35054 Pass - Minor 1/10, Es, SF CC - Min centre to Center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1:02:42PM Page 10 COMPASS 5000.1 Build 816 r BP byTravelling Cylinder Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore R -28A Database: Reference Design: R -28A WP08 Offset ND Reference: ri.9 BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCPt Offset Datum Offset Design PB R Pad - R-14 - R -14A - R -14A ORSM site error. 0.00 visa survey Program: 100 -e063 -GYRO, 980SMWD Rule Auignetl: Minor l/ to OftsM Wall EvoC 0.00 poll Retaeri Onset Semi Major Acis Measured Vertical pressured Vertical Reforance Offset TPolracea met WelOore came Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Aavnuth nW$ +VM No. aIle Camara, GistenGa GeVMlion (pant (usft) (mean Past teat (ust (°) (pan) foah) (in) lust lust (usft) 10,27500 8.593.00 9,77500 0.498.92 2242 10721 .127.67 310.76 -2.904.11 3.562 356.21 Ilea 351.54 Pass - Minor 1110 10,20134 8,59300 9,80000 8.51265 22.49 108.02 430.45 318.77 -2.99800 3.562 359.41 1205 353.98 Pass - Minor 1/10 10.297.77 8,593.00 9,825.00 8.538.42 22.68 180.42 -134.78 31881 -3.012.00 3.562 363.99 922 350, 60 Pass - Minor 1110 10,348.37 8.593.00 9.85000 8,559.21 2325 186.82 -143.99 310.06 -3.02500 3.562 369.10 6.58 364.09 Pan - Minor 1/10 10.40145 8,593.00 9.875.00 050002 23.94 188.22 -153.86 310.89 303912 3.562 374.14 4.70 369.57 Pam - Minor 1110 10.46429 8,593.00 9,900.00 8,600.60 24.77 18938 -164.54 318.86 -3.05392 3562 378.98 4.50 374.48 Pass - Minor 1110 10,542.58 8.593.00 892500 8,619.40 25.81 189.38 -17674 318.03 -3.07024 3.562 384.01 4.62 379.41 Pass Minm1/10 10.57500 B.593.00 9.95000 0.63561 26.24 18838 17921 315.57 -3,069.14 3.562 389.57 456 38490 Pass - Minor 1/10 10,58505 0593.00 9,975.00 0,618.36 26.37 18830 17868 311.56 -3,11023 3.552 397.30 467 39272 Pass - Minor l/W 10,60000 0,592.99 10.000,00 6,856.82 26.57 189.39 179.45 306.53 -3,133.17 3.562 408.44 4.71 40186 Pass - Minor 1110 10.60940 8,592.98 10.02500 8 W61 2670 18939 -179.88 301.05 3.15207 3.552 416.18 469 411.60 Pass - Minor 1/10 10,62500 8,592.97 10.05000 806428 2692 18939 .118.10 293.65 -3.18070 3.552 428.02 474 423,43 Pass - Minor IIID 10631,42 0,582.98 10.075.00 0,855.99 27.01 189.40 -17222 262.40 -3,20303 3582 44350 4.71 43890 Pass - Minor 1/10 10,640.0 0,59295 10,10000 8666.58 27.13 189.40 -175.80 268.14 -3.223.49 3562 461.85 4.72 45224 Pass - Minor 1110 10,85000 0,59294 10,12500 8.688.20 2726 189.41 -17049 251.54 -3.24209 3562 482,41 4.76 47778 Pass - Minor Ill 10,85000 6.592.94 10.15000 6871.32 27.26 18941 -174.46 233.47 -3259.06 3562 50439 4.70 49977 Pass - Minor 1/10 10,65844 859292 10.175.00 8876.26 27.38 18942 -173.60 215.24 3,27543 3562 52876 4.73 522.13 Pass - Minor 1/10 10,663,27 8.59292 10,200.00 8.68287 27.45 18942 .173.32 196.95 .3291.22 3.562 54940 473 544.79 Pass - Minor 1110 10,06261 8.59291 1032500 8.690.13 2251 109.43 -173.18 178.54 -3,306.40 3562 57228 4.72 567.68 Pass - Minor 1110 10,675.00 9,592.69 10.25000 sins 71 2282 189.43 -172.55 159.43 -3,321.11 3582 595.65 4.75 59105 Pass - Minor 1/10 10.67500 9,592.89 10,27500 8.702.15 27.62 18944 -172.67 139.83 .3,335.37 3.562 619.36 4.71 61479 Pass - Minor 1110 10.67500 8,592.89 10.300.00 8.706.4B 27.62 189.44 -172.68 11927 3,34920 3.562 64338 467 63B.83 Pa.. - Minor 1110 10.67500 8.592.89 10,325.00 8,709.64 27.62 10945 -17259 98.39 3,362.57 3.562 667.59 463 66306 Pass - Minor 1110 10,862.91 8,592.88 10,35000 8,71154 27,73 10945 171.44 7706 3,37548 3.582 691 79 467 68726 Pass - Minor 1/10 10,084.96 8.592.87 10.375.00 0,112.01 27.76 18946 -170.90 5546 338805 3.562 71801 665 711.48 Pass - Minor 1/10 1080227 8,592.07 10,40000 8,711.44 27.79 109.46 .17026 34.31 3,40135 3.562 73990 4.64 735.37 Pass - Minor 1/10 10.69000 8,502.88 10.42500 8.709.93 27.83 109.47 -189.54 13.96 -3,41579 3.562 763.32 463 758.80 Pass - Minor 1/10 10,69287 8592.86 10,450.00 8.707.50 27.87 IWO -168.75 591 -3,430.76 3562 786.42 463 781.89 Pass - Min., 1110 10.700.00 8,592.84 10,475.00 8,70460 2797 189.48 -16745 .25.81 4.445.87 3582 809.46 4.66 804.92 Pa. -Min., 1/10 10,700.00 8,592.04 10.50000 6,701.56 2297 18969 -167.02 -4534 3.46093 3562 832.51 482 827.98 Pa. -Min., 1/10 10,70000 8592.84 10,52500 0.69a08 27.97 189.50 -168.62 -6473 3476.43 3.562 855.55 4.59 851.03 Pa. - Minor 1110 1070000 8,592.84 10.550.00 8.696.18 27.97 109.51 468.27 -8349 3492.7 3.562 878,441 4.55 873.94 Pass - Minor 1/10 10]0261 8.592.02 10,575.00 8.694.05 2808 189.52 -165.05 -101.61 3,509.06 3582 901.09 458 896.58 Pa. - Minor 1/10 10,711.04 8.592.01 10,600.00 8.692.22 20.13 189.52 -16437 -119.19 41.52253 3562 923.61 4.57 919.11 Pass - Minor 1110 10,714.70 8,592.80 10625.00 8.690.B2 20.18 189.53 -16330 43801 4,545.97 3.562 945.65 4.55 94136 Pass - Minor 1/10 10]25.00 8,592.77 1065000 8.690.11 20.33 189.54 -162.29 -151.53 3,585.55 3.562 pan% 4.59 963.06 Pass - Minor 1110 10,725.00 8592.77 10,67500 8,690.01 28.33 189.% -162.16 -165.48 3,586.30 3.562 988.32 4.52 983.87 Pan - Minor 1/10 10]2500 0,592.77 10700.00 8.690.33 28.33 189.57 -162.07 4.4.19 -3.608.35 3562 1,007.85 444 1,00344 Pass - Minor 1110 10.733.01 8,59275 10725.00 S691.05 2845 189.59 -160.96 488.61 -3.631.50 3562 1,025.90 4.43 1,02152 Pass - Minor VlO 10.739.73 8,592.73 10,750,00 0,692.11 20.53 189.60 -16022 -193.75 -3,85542 3.562 1,042A6 439 1.038.15 Pass - Minor 1110 10,750.00 8.59270 10,77500 8692.37 28,611 189.62 -158.92 -198.92 -3,879.07 3.562 1.05771 437 1.05341 Pae. - Minor 1110 10,750.00 8592.70 10.80000 8891,48 28,611 18984 -158.81 -202.20 -3,70463 3.562 1,071,49 426 1,06721 Pass - Minor 1110 1075902 8.592.67 1082500 0,68987 28.81 16966 -15757 -203.43 3,72952 3.562 1.00374 4.22 1,079.57 Pass - Minor 1110 10,765.87 8,59264 10,85000 0681.19 20.90 169.86 .1%57 -20242 -37549 3.562 1.094.25 4.15 1,090.15 Pas. - Minor 1110 10,11500 8,592,61 10,875.00 likes 75 29.03 18970 -155.31 -190.52 -3.77093 3.562 1.102.45 4.10 1,M8,41 Pass - Minor 1110 10.175 DO 8.592.61 10.900.00 8.602.57 29.03 18973 -155.17 -191.74 -3,80380 3.562 1.100.26 396 1,104.33 Pass - Minor 1110 10787,10 8.59256 10,92500 8,681.47 29.21 18975 -153.58 -182.85 3.826.21 3562 1,112.33 3.92 1,108d6 Pass - Minor 1110 CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 2/62017 1:02:42PM Page 11 COMPASS 5000.1 Build 81B j b BP �.1trr Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore R -28A Database: Reference Design: R -28A WP08 Offset TVD Reference: I/.R2 HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PBR Pad - R-14 - R -14A- R -14A Offset She Emor: 0.00 on Survey Program: 100 -BOW -GYRO. 9885 -MWD Rule Aseighae: Minor 1/10 Ofaat"I Eder: 0.00 tell Reference Offset Sem, Major Asia Measured Vertical instrument Vertical Reference Offset Toottace♦ West Wellbore cents casing- Centre to No Go Alloaab,e Warning Depth Depth Depth Depth Azimuth ♦W8 ae6W Hole Shoe Centre Distance Deviation heart) tum) (mol loan) (usft) (um) 19 loan) tum) (m) hung (might (usft) 11,106.56 8.50286 10.950.00 888159 35.02 189.77 173.37 -17209 -3,848.76 3562 110927 5.23 1,106.00 Pass - Minor 1110 11,200.00 8.58227 10.975.00 8,68212 3523 18979 -171.81 -15920 3,870.17 3.562 1,10142 5.27 1,098.24 Pass - Minor 1110 11200.00 8.58227 11,00000 0.682.75 35.23 189.81 -17104 -14432 -3,090,53 3562 1.09203 5.15 1,006.91 Pass - Minor 1110 11.20000 8,58227 11,02500 8,68303 35.23 189.83 -172.05 -130.73 3,911.24 3.562 1.083.65 5.03 1,078.60 Pass - Minor 1/10 11.21529 8.58181 11,050.00 6,88301 35.45 189.85 -17022 -1190a -3.93280 3.562 1,076.94 5.07 1,071.91 Pass - Minor 1110 11,225.00 8.591.19 11,075.00 0,682.79 35.61 189.88 -16907 -10743 -3.955.41 3.562 1.07289 5.05 1057,90 Pass - Minor 1110 11225.00 8.581.19 11.10000 8682.92 3561 18990 469.14 -90]7 -3,978.05 1562 1,07143 4.91 1,06653 Paas - Minor 1/10 11.238.20 8,58061 11,125.00 0,68196 35.81 199.93 -15159 -92.18 -4,002.93 3.562 1,07253 4.91 1.067.67 Pass -Minor 1110 11.250.00 8580.10 11,15000 8686.34 35.99 10996 -166.20 -07.76 -4.02741 3552 1,07641 4.09 1,071.59 Pass - Minor 1110 11,250.00 8,580.10 11,175.00 8.690.19 35.99 18899 -16851 -05.11 -4,051.96 3.562 1,002.40 476 1.077,75 Paas -Minor 1/10 11.260.24 8579.85 11,200.00 0,59562 36.15 190.02 -16552 83.09 -4,076.33 3582 IDW35 473 1.08567 Pass -Minor 1110 11.266.96 8,579.38 11.225.00 8702,41 30.26 190.05 -16503 -04.23 -4,100.38 3.562 1,100.07 468 1,09545 Pass -Minor 1110 11,275.00 8.579.02 1125000 8.710.34 38.38 19008 -166.42 -06.27 4,123.99 3.562 1.11168 4.65 1,107.11 Paws Minor 1110 11,275.00 8.579.02 11.275.OD 9.719.36 38.38 1901,. -154.84 -90.02 -4,147.00 3.562 1.125.08 4.54 112059 Pass - Minor 1110 11,28441 8,57861 11,30100 8.72947 36.53 190.14 464.12 -9553 -4,169,18 3.562 1,140.13 4.53 1.13568 Pass - Min., 1110 11,289.16 8,57840 1192500 8740.54 MAD 190.17 -164.00 -10268 4,19042 3.562 1,156]0 449 1.152.30 Pass - Minor 1/10 11,30000 8,577.94 11,350.00 8,75221 3677 190.19 -163.13 410.94 4310.92 3.562 1,174,34 8.33 1.166.17 Pass - Minor 1110 11,30000 8,577,94 11375.00 8,76391 3677 190.20 -163.60 41925 4,231.39 3,562 1192.12 13.82 1,178.83 Pass - Minor 1110 11,30000 9,577.94 11,37800 8,765.31 3877 190.20 -163.66 -120.24 4233.95 3.562 1.194.27 14.51 1,180.38 Pass - M'orm Vic CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1:02: 42PM Page 12 COMPASS 5000.1 Build BIB +.� by BP F31 Fag Travelling Cylinder Report BAKER UHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB R Pad MD Reference: ORIG KELLY BUSHING @ 51.20usft 96 -BOSS -GYRO, 8401 -MM (DOYON 16) Site Error: 0.00 usft North Reference: True Reference Well: R-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore R -28A Database: EDM RSK- Alaska PROD -ANCP1 Reference Design: R -28A WP08 Offset TVD Reference: Offset Datum Offset Design PB R Pad - R-15 - R -15A - R -15A Olrest ane Emer: 0.00 usn Survey Program: 96 -BOSS -GYRO, 8401 -MM Rule leanest: Major Risk met Well En9r: 000 us8 R.rmence what BemlMgorrexis Measured Vertical Maaauratl Vertical Reterance onto Toolface+ Offset Wellbora Centra C.."- Centre 1,b Noses Allowable Warning Depth Depth Depth Depth Aain.th +NIS +EIM H.I. BW Cents Distance Deviation Iota") law) lean) lush) (uaR) (ush) i°) lust hiss) (in) (ess) (ura) (ies) 915642 8.570.48 9525.00 8824.94 1566 6680 35.19 1,35735 -1,145.40 5931 1,3811 282.41 1,130.19 Pass - Major Risk 9, 534 a5 8,737.09 9,550.00 8,818.42 16.34 6886 4839 1.353.00 4,169.12 3.562 1.311.99 244.13 1,137,08 Pass - Major Risk 9,54065 8,735.94 9,575.00 0.81328 1635 66.91 4751 1,369.50 .1.19247 3.562 1.36620 245.913 1, 123.59 Pass - Major Risk 9550.00 8.732.74 960000 8.006.88 1638 66.97 4599 1.377.10 -1.21540 3562 1.35598 248.83 1,111.70 Pass - Major Risk 9,550.00 8.732.74 9.82500 8,800.15 16.38 0703 4607 1385.58 1,237.94 3,562 1,34693 249.15 1100.19 Pass - Major Risk 9.558.03 8729]2 9.65000 879308 1841 6709 44.62 1.394.67 4,26DA3 3.562 1.33a B4 251.03 1,090.33 Pas. - Major Risk 9.565.11 6,727.57 %675.00 8,785.85 1643 67.16 4360 1.404.06 1.252.14 3.562 1.331.41 25380 1.080.92 Pass - Major Risk 9,57500 0.724.19 9,700.00 8.778.73 1646 67.22 4197 1,41338 1.304.21 3562 1,32423 25664 1,072.04 Pass - Major Risk 9.57500 8,724.19 9725.00 8,772.12 1646 67.29 42.05 142253 -1,326.52 3.562 131708 257.00 1.06244 Pass - Major Risk 9584.14 8,72106 9750.00 8766.50 16.50 67.36 4062 1431.77 -1.34906 3.562 131021 25960 1.053.79 Pass - Major Risk 9.590.54 071887 9,77500 8,761.05 1652 67.44 3969 144156 -1.371.58 3582 1,304.15 261,50 1.045.72 Pass - Map(Risk 9.600.00 0.71564 9,800.00 8,757.94 1656 67.52 30.28 1,451.52 -1.394.18 a%2 1,298.57 114.05 1.03833 Pass - Mayr Risk 9.800.00 8,715.64 9025.00 6,15477 1656 67.60 30.52 146173 -1,416.77 3.562 1,29354 264.47 1.03088 Pass - Map, Risk 9,609.82 8.71228 9,050.00 8,752.22 1660 67,66 37.11 1,472.06 4,439.40 3.562 1.200.94 287.04 1.02448 Paas - Map, Risk 9,616.25 8.71008 9,875.00 8.750.11 1663 6777 38.30 1,482.32 -1.482.10 3.552 1.204.61 28882 1,018.16 Pass -Major Risk 982500 8.707.09 9,900.00 8,740.49 16.87 67.86 35.12 1,492.39 -1,484.92 3.552 1,200.44 27103 1,012.18 Pass - Major Risk 982500 8,707.09 9,925.00 8747.91 1867 67.95 3547 1,501.82 -1.508.14 3,552 1,275.75 27148 1005.19 Pass -Major Risk 9,63525 8,703.59 9.850.00 8.74798 16.71 6805 34.11 1.51040 -1,531.52 3.562 1271.00 273.90 98877 Pass - Major Risk 9.84144 8.701.47 9,975.00 0748.82 16.74 68.14 3347 1.518.73 .1,555.10 3.562 1286.03 275.50 991.95 Pass - Major Risk 9,65000 8.698.54 10,000.00 0.75062 1679 6825 3246 1,526.21 .1,518.69 3.562 1,260.71 21747 904.95 Pass - Major Risk 9.85000 8.690.54 10,025.00 0,753.38 16.79 6835 3297 1,53331 -1,60269 3.562 1,255.46 27793 977.63 Pass - Major Risk 9,659.34 8.695.35 10,050.00 075734 1683 6845 3193 1,539.42 -1,62661 3562 1,249.68 27895 970.33 Pass - Major Risk g,565.11 8,693.37 10,075.00 8761.76 16.06 68.56 3152 1545.14 1,650.54 3862 1,243.97 281.33 98298 Pass - Major Risk 9,675.00 8,689.99 10,100.00 0,76626 16.92 6867 3041 1,551.06 -167441 1562 1,238.87 28328 956.47 Pass - Major Risk 9675.00 8.60999 10,12500 8,770.57 1692 6878 30.99 1.557.03 169030 1562 1,234.14 28377 949.93 Pas, - Major Risk 0.675.00 8,689.99 10,15000 8,77438 16.92 68.89 31.56 1562.36 172242 3552 1,229.19 28425 94325 Pass - Major Risk 0,688.72 8685.29 10.115.00 8,777.90 18.69 8901 2977 1566.99 1.746.70 3,662 1223.72 28662 935.63 Pass - Major Risk 9700.00 8,601.44 10.20000 6,781.34 17.06 69.13 28.39 1,57143 1,771.10 3.562 1318.55 288.49 93024 Pa.. - Major Risk 9.700.00 8681 44 10.225.00 8,78452 17.06 69,25 2894 1,575.43 .179557 3.562 1.21323 28899 923.36 Pass - Major Risk 9.709.33 0,678.25 10,250.00 8.787.21 17.11 69,37 21.88 1,578.88 -1,820.16 3.562 1.207.74 290.53 91666 Pass - Major Risk 9.709.33 8,67825 10.275.00 8.789.55 11.11 69.50 2840 1,582.19 -1.84485 3562 1.20245 291.04 909.93 Pass - Majo, Risk 9,71939 8,67481 10,300.00 8,791.00 1718 69.63 2720 1.585.17 -1.86956 3562 1,197.19 292.06 90357 Pass - Major Risk 9,725.00 8,672.89 10.32500 8,794.21 1121 69.75 26.77 11588.08 -1.89428 3.562 1,192.25 294.10 997,47 Pass - Major Risk 9.72500 0,672.89 10.35000 8,198.81 17.21 59.09 27.31 1.591.17 -1,91897 3.562 1,187.97 294.64 89197 Pass - Mepr Risk 9,73834 8.66833 10,375.00 8.798.10 17.30 70.02 25.55 1,594.36 -1,94384 3.562 1.184.06 296.74 887.15 Pa.. -Map, Risk 9.750.00 8.664.34 10,400.00 8.801,58 17.37 70.16 24.10 1.597,30 -196534 a%2 1,180.41 290.48 88259 Pass - Major Risk 9,75000 8,654.34 10,425.00 8.004.06 1737 70.30 2465 1,600.35 -1,96303 3.562 1,177.10 298.03 878.35 Pass - Major Risk 9,76000 8,684.34 10,450.00 6506.59 17.37 7044 25.19 1.60157 -2,017.70 3.562 1,11485 299.60 87491 Pas. - Major Risk 9,76400 8,659.52 10,475.00 0,008,94 17.47 70.58 2332 1.606.97 -2.042.35 3.552 1.172.52 30139 87203 Pass - Major Risk 9,77500 8,655.79 10,500.00 0.01087 17.55 70.73 21.96 1.611.01 @,068.94 3.552 1,171.48 302.76 07024 Pass - Majo, Risk, CC 9.77500 8.655.79 10,525.00 0,01228 1755 70.88 22.45 1,616.27 -2,08134 3.582 1,171.96 30335 059.98 Pass- Major Risk, ES, SF 9.784.10 8,65268 10,550.00 0.81347 1761 7103 21.35 1,621.94 -2,11565 3.562 1,173.22 30449 070.56 Pass - Major Risk 9.790.05 8,650.37 10,574.91 8,01396 1766 71.18 2062. 1,626.98 -2,138.55 3,562 1,176.19 30542 07290 Pass - Major Risk 9,800.00 8,647.24 10,500,00 8.813.65 17.73 71.34 1942. 1,637.33 -2.163.20 1562 1,100.79 30839 076.89 Pass - Majo, Risk 9,800.00 5,647.24 1062500 8,812.72 17.73 7149 1974 1,645.54 -2,186.42 3.562 1,105.58 30698 882.19 Pass - Major Risk 9,511.12 8,64343 10,65000 8,81144 17.01 1185 18.13 1,858.84 .2,209.16 3.562 1,193.18 30780 608.80 Pass - Major Risk 9.825.00 8,638.69 10,675.00 11 17.91 71.80 16.03 1,688.41 -2,231.26 3,562 1.20279 308.59 897.23 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 21612017 1:02:42PM Page 13 COMPASS 5000.1 Build 81B BP (ok by Travelling Cylinder Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore R -28A Database: Reference Design: R -28A WPO8 Offset TVD Reference: ri.I BAKER HUGHES Well R-28 Mean Sea Level - ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PBRPad- R -15 -R -15A -R -15A omit sake error: 000 usft survey Program: 96.806s -GYRO, 8401 -MWD Rule Assigned: Major Risk Offset Well Error. 0.00 usft Reference Onset semi Major Aals Measured Vmi,al Measured Vinical Reference Offset mutters+ Offset Wellbore Centre Casing- centre to No Go Allowable Vhming Depth Depth CapN Deptin Azimuth +N18 +V.w Nola site Centre Distance Deviation (heal (usft( (usit) (usft) (.it) (ham (1) Juan) (usft) (M) Junde (usft) (usft) 9,02500 8.638.69 10.700.00 8,809.49 1781 71.% 16.29 1.68125 -2,252.72 3.562 1,21]22 309.17 90].39 Pass - Major Risk 10,38273 8.59300 10.72500 9.809.28 23.45 72.11 39.02 1,694.51 .2,273.91 3.562 1,21947 30071 913.53 Pass - Major Risk 10.37500 9,593110 10.75000 8.809.82 23.61 72.27 37.55 1.708.16 -2.294.05 3.562 1,22163 31288 913.79 Pass - Major Risk 10.375.00 9.59300 10,77500 8,81089 23.61 72.42 37.57 1,722A9 -2.315.30 3.552 1.22500 31355 814.93 Pass - Major Risk 10.383.83 8,59300 10,80000 9.812.34 2372 72.50 36.55 1,73887 -2,33563 3.562 1,229.00 315.91 917,07 Pass -Major Risk 10,390.78 8.59300 1082500 8.813.96 23.81 72.73 35.75 1.75156 -2,355.07 3.562 1,23352 31784 919.75 Past - Major Risk 10.40000 8.59300 10.85000 8,81568 23.93 72.89 3469 1.766.16 -2.37809 3.562 1,238,45 320,09 922.93 Pass - Major Risk 10.400.00 9,593.00 10,875.00 8,817.41 23.93 73.D5 3472 1,791.11 -2.398.05 3.582 1,244.14 32076 928.00 Pass - Major Risk 10,411.26 8.593.00 10,900.00 8.819.07 2407 73.21 3339 1,79978 2,415.47 3.562 1,25096 32321 93204 Pass - Major Risk 10,42500 8.593.00 10.92500 8820.43 24.25 73.M 31 ]3 1,813.28 -2.434.19 3.562 1,25921 325.82 930.77 Pass - Major Risk 10,42500 8,59300 10.950.00 8.82064 24.25 73.51 3167 1,930.48 -2.452.32 3.652 1,26827 326.46 94423 Pass - Major Risk 10,425.00 8,59300 10,975.00 8.820.30 24.25 73.65 31.57 1,547.97 -2.470.10 3362 1,279.01 327.09 95447 Pass - Major Risk 10436.05 8,59300 11000.00 8,819.77 24.41 73.01 30.04 1,88564 -2,407.05 3.562 1,288.15 32920 963.10 Pass - Major Risk 10450.00 8,593.00 11,025.00 8,819.17 24.58 73% 2935 1.683.70 -2.505.14 3.562 1.299.18 33124 972.81 Pass - Major Risk 10.450.00 8,593.00 11.050.00 8.810.57 24.58 74.10 2823 1.902.56 -2,52153 3.662 1,311.39 33183 983.77 Pass - Major Risk 10,450.00 8,59300 11,07500 8.617,79 24.58 74.24 28.09 1,922.36 -2.53685 3.652 1,325.06 332.40 99592 Paas - Major Risk 1045969 0.593.00 11,10000 0.016.85 2411 7487 26.70 1,942.50 -2,551.43 3.562 1,33963 333.83 1,00972 Pass Major Risk 10464.88 0.593.00 1112500 0,815.04 24,78 74.51 26,01 1.983.07 -2,56571 3.562 1,35471 334.78 1.023.75 Pass - Major Risk 10475.00 0,593.00 11,15000 8814.71 24.91 7464 24.64 1.903.57 .2,579.98 3.562 1.370.05 336.01 1.037.88 Pate - Major Risk 10.475.00 8593.00 11,17500 0,013.28 24.91 74.77 24A0 2,004.05 -2,59424 3.562 1.305.46 336.53 1.05254 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/8/2017 1:0242PM Page 14 COMPASS 50001 Build 81B 1.11400 b BP / pTravelling Cylinder Report BAKERAKERER HUGHES Company: North America -ALASKA - BP Project: Pwdhoe Bay Reference Site: PS R Pad Site Error: 0.00 usft Reference Well: R-28 Well Error: 0.00 usft Reference Wellbore R -28A Reference Design: R -28A WPO8 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB R Pad - R-17 - R -17B - Plan #15 R -17B approved oRuteleaError: 0.00 ua6 Survey Program: it&BOSB-GYRO, 377SGYD-GC-MS.4253-10NANFR+MSWOCA, 9491.1,1WDMFR+MSWOG4, 9]1}MWD, 971 Rule Assigmtl: Major Risk OneH Well Error; 0.0) part Reference Offset Semi Mejor Axis Measured Verthal Measured Vertical Reference Onset Toolface+ Offset Wellbore Gmre Casing- C.Mreto No Oo Alloeable Warning Depth Depth Depth Depth Avenin, HV45 +EI -W Hole sip centre DiWnce Deviation heart (..M (-M (aan) (unit) Wi 19 (peal laaftl (in) fusel tusnl (usft) 9.109.61 8,536.00 13,350W 0609.64 15.53 22.94 -17560 £9051 -1944.96 4.375 097.32 1487 755.67 Pass- Major Risk, CC, ES. SF 9,11942 0.54649 13,375.0 660878 15.56 2309 -174.24 480.71 -1,969.88 4.375 098.14 14929 756.48 Pass - Major Risk 912914 0.554.99 13,4000 9,607.91 15.59 23.23 -172.90 48891 -1.994.80 4.375 899.53 149.00 75790 Pass. Major Risk 9.139.07 6.583.49 13,425.00 0.60705 15.61 23.38 -171.37 885.11 -2.019.72 4.375 90149 150.32 759.94 Pass - Major Risk 9,148.91 8,571.89 13,450.0 0,606.19 1584 23.52 -169.94 68331 -2,044.64 4.375 904.01 150.93 761 Pass - Major Risk 9.158.75 0,500.50 13,475.W 9605.32 15.67 2167 -160.53 40151 -2.069.56 4.375 907.08 151.34 76580 Pass - Major Risk 9,18861 0,589.02 13,500.00 11604,46 15.70 2381 -157.12 67970 -2,09448 4.375 910.71 151.84 769.52 Pass - Major Risk 9,17947 0,597.53 13.5250 0.603.60 15.72 23.96 -16573 4inso -2.11940 4.375 914.87 152.34 774.02 Pass - Major Risk 9,18834 8,60.0 13,550.00 8,602.73 15.75 24.11 -164.35 676.10 -2,14432 4.375 919.58 15284 778.99 Pass - Major Risk 9.19822 0,614.58 13,5750 8601.87 15.78 24.25 -182.96 8]4.30 -2.16914 4.375 924.81 15333 784.53 Pas. - Major Risk 9,20885 9,623.58 13,600.00 8.601,00 15]9 24.40 -161.64 872.50 -2,194.16 4.375 930.56 15]]7 79066 Pass - Major Risk CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1:02..42PM Page 15 COMPASS 5000.1 Build 818 b BPwel &V pTravelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB R Pad Site Error: 0.00 us% Reference Well: R-28 Well Error, 0.00 usR Reference Wellbore R -28A Reference Design: R -28A WP08 Local Co-ordinate Reference 7VD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PBR Pad - R-17 - R-178 - R -17B Meet side Error: oaousa Survey Program: 116-BOSS-GYRO,3773-GYD-GC-MS, 425SMVaD+IFR+MSW0CX k491-MW0r+IFR+Ma-WDOA, 9839-MWD+IFR Rule AeflgnW: Major Risk Olfeet Well Error: ON ur8 Reference Me" send Major Axle Measured Vertical Measured Vertical Reference meet reason+ Oneet Wellbore Centre Casing- Centre to No Go Allocable Waning Depth Depth Depth Depth Azimuth +R14 +E/ -W Hole Was Centra Distance Deviation (dea) (deft) (uenl (dell (um) (dart) V) (urn) (deal (In) (den) (dart) (..it) 9,103.55 0,92.75 13,350.00 8,610.40 15.51 21.97 -177.72 605.66 1.913.50 5.937 890.74 146.11 750.90 Pass - Major Risk 9,114.90 0,542.57 13,375.00 8,619.45 15.55 22.10 -176.34 60063 -1.930.00 5.937 887.89 146.61 747.92 Pass - Major Risk 9,12627 855242 13,400.00 8620.52 1558 22.23 -174.95 -676.19 4962.64 5937 86576 147.09 74571 Pass - Major Risk 9,137.65 856227 13.425.00 8.621.58 1561 22.36 -173.56 -67187 -1.987.11 5,937 884.29 147.50 744.20 Pass - Major Risk 9.148.90 8.57205 13,450.00 8,622.51 1564 22.50 -172.15 -667,02 -2.011.66 5.937 88320 140.06 743.10 Pass -Major Risk 9,16021 8.58176 13,475.00 0,62330 1567 2263 -170.74 -66220 -2,036.17 5.937 882.48 149.03 74245 Pass- Major Risk, ES. SF 9,171 43 8.591,46 13.500.00 0.624.03 15.70 2273 -169.33 -657.33 -2,06068 5.937 882.23 152.69 742.53 Pass -Major Risk. CC 9.170.18 8,59728 13.5150D 9,624.47 1572 2260 -1613.48 -654.40 -207539 5.937 682.34 154.04 742.65 Pass - Major Risk ^a n CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1: 02:42PM Page 16 COMPASS 5000.1 Build BIB I I b BP f p Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 list North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0,00 usft Output errors are at Reference Wellbore R -28A Database: Reference Design: R-28AWPO8 Offset TVD Reference: rias BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB R Pad - R-28 - R-28 - R-28 onset line Error: 000 uae survey Program: 100.GCT-MS Rule Assigned: NOERRORS Offset Well Ertor: 0.0.0 ft Reference Offset Beal Major Asia Measured Vertical Measured Visai Rehrence me Tease. Offset Wellbore Cahn Casing- Cantrato Foca AlkwabR blaming Depth Depth Ni Depth AzMuth ♦1414 +VM We she Centre Dann. Dev4tlan loan) (osn) (-M (uaR) (usff) (u -n) (°) (.an) luso) Un) tuft) (uaft) (usn) 9,12500 8,55132 9,125.00 0,551.32 0.07 0.10 -76.16 20160 -1866.22 0000 000 0.01 000 Pass - NOERRORS 9.150.00 8.$72.94 9.150.00 8572.94 0.14 021 -75.60 204.66 -1,870.39 0,000 000 004 0.00 Pass - NOERRORS 9.175.00 0.594.54 9.175.00 8,594.54 0.21 0.31 -75.05 207.85 -1,890.57 0.000 0.00 0.09 000 Pass - NOERRORS 9,200.00 8,616.12 9,200.00 8616.12 0.20 0.42 -74.50 211.16 -1,90275 0000 am 0.18 0.0 Pass - NOERRORS 9.225.00 8,637,67 9,225.00 863768 0.29 0.54 169.94 214.58 -1,814.93 0,000 004 0.25 004 Pass - NOERRORS 9.250.00 8.65922 9.250.00 8.65822 030 067 -49,06 218.07 -1.927.13 0.000 000 032 000 Pass-NOERRORS 9,274.98 8.68049 9275.00 8.680.75 0.31 079 13445 221.64 -1,93933 0,000 051 0.93 0.51 Pass-NOERRORS 9,29946 8.699.91 9,300.00 8.702.25 0.33 0.92 137,84 22529 -1,95t55 0000 382 2.52 382 Pass - NOERRORS 9,322.53 9,71620 9,32500 8.72373 0.3fi 1.04 13925 22803 -195377 0000 10.61 3.98 1061 Pass-NOERRORS 9.34352 8.729.04 9.30.00 8.745.19 0.39 1.17 14041 232.89 -1,97601 0000 2049 5.26 2049 Pass - NOERRORS 9,362.16 8,738.67 9,375.00 8.76562 0.43 130 14142 23866 -1,98826 0.00 32.98 6.34 3288 Pass - NOERRORS 9,37843 8,74562 9400.00 9.788.02 047 143 142.34 24095 -2,000.51 0000 47.62 7.22 47.62 Pass - NOERRORS 9,39252 8.75047 9.4250 8,809.41 052 1.55 143.17 245.14 -2,012.76 0.000 64.03 7.92 64.03 Pass - NOERRORS 9.404.65 8.75377 94000 8,83080 056 168 143.91 24941 -2.024.97 0.000 81.86 B48 81.86 Pass- NOERRORS, CC, ES, 51 9415.11 8755.93 9.475.00 8,852.19 061 1 s 144.57 25378 2.037.15 0,000 100.82 8.93 10082 Pass- NOERRORS 9424.17 8.75729 9,500.00 8,873.58 0.65 1.92 145.17 25834 -2,049.30 0,000 120.70 929 120.70 Pass - NOERRORS 9,432,03 8,75808 9,52500 8,894.98 0.69 2.03 14569 262.79 -2,061.40 0,000 141.31 9.58 141.31 Pass-NOERRORS 9,440.00 8,75851 9.55000 891640 074 2.14 146.25 267.43 -2.07343 0,000 162.53 9.85 16253 Pass - NOERRORS 9,44491 8,758.59 9.575.00 8,937.84 076 2.24 146.55 272.17 -2.085.39 0,000 164.24 1001 18424 Pass - NOERRORS 9.450.00 0,758.52 9.6000 8,959.29 079 2.35 146.89 276.99 -2,097.29 0.000 206.35 10.15 205.35 Pass - NOERRORS 9,454.94 8,758.31 9.62500 0.980.75 082 246 14723 281.88 -2,109.15 0000 228.81 10.30 22881 Pau - NOERRORS 9,460.00 8,75794 9,65000 9.002.22 0.85 2.56 1261 286.80 -2,12098 0000 251.56 10.43 251.55 Pass - NOERRORS 9,462.91 8]57,66 9.57500 9,023.69 0.87 266 147.80 291.74 -2,13278 0.000 27455 10.50 274.55 Pau - NOERRORS 9.466.30 0,75727 9.700.00 9,045.17 0.89 276 14806 29572 -2,144.56 0.000 29775 10.58 29775 Pau - NCERRORS 9.470.00 8,756.77 9,725.00 sM6.66 0.91 289 146.36 301.71 -2,156.33 0.000 321.12 10.66 321.12 Pass - NOERRORS 9.470.00 87:4.77 9,750.00 9,088.14 0.91 3.01 148.30 306.70 -2,168.10 0000 34487 1066 344.67 Pass-NOERRORS 9.474.69 8.756.02 9,775.00 9,10963 0.94 3.13 14874 31169 -2,17986 o00o 38832 10.76 368.32 Pass - NOERRORS 9,480.00 8,765.02 9.800.00 9,131.11 0.97 3.25 149.28 316.60 -2,19163 0,000 392.14 10.86 392.14 Pass-NOERRORS 9.480.00 8,755.02 9.826.00 9,15260 097 3.32 149.23 321.67 -2,203.40 0.000 416.99 10.85 415.99 Pass - NOERRORS 9480.00 8,755.02 9,836.00 9,16205 0.97 3.35 14922 323.88 -2,20858 0.000 426.52 10.86 42652 Pass - NOERRORS CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/62017 102: 42PM Page 17 COMPASS 5000.1 Build 81B .�M. I BP WE.9 pTravelling Cylinder Report BAKER onset SM Error. OM ties FIUGHES Company: North America -ALASKA- BP Local Co-ordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB R Pad MD Reference: ORIG KELLY BUSHING @ 51.20usft '. West Semi Major Atls (DOYON 16) - Site Error: 0.00 usft North Reference: True Reference Well: R-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00 us% Output errors are at 1.00 sigma Reference Wellbore R -28A Database: EDM R5K-Alaska PROD -ANCP7 Reference Design: R -28A WPO8 Offset TVD Reference: Offset Datum Offset Design PB R Pad - R-29 - R-29. R-29 onset SM Error. OM ties Survey Program: 42 -GW -MB R.I. A1.19 O: Major Risk 0*W Well ERor: O.W usll Reference West Semi Major Atls Wei VanlcW Measured Vai Reference OBset Ta.1fi+ ODael 99e110om Centre Colo- Care.W No Go Allowable, Wamin9 Depth Depth Depui Depth Ammith +1113 ♦Et -W Nuis, alas, Centre Dlsrance Deviation hall (ien) (.rt) hart) la.nj (usft) r) (uaft) (tiato Iln) loan) (aaO) luaRt 10,304.83 8593.00 832500 7.28489 2276 21,43 -35.04 Sal 97 -2,536.70 6.250 136529 160.24 1,296.77 Pass - Major Risk 10,312.81 8.593.00 835000 7,304.12 22.85 2155 -35.07 988.03 -2,551.57 6.250 1,36596 169.34 1,27660 Pass - Major Risk 10,32500 0,593.00 8.375.00 7,32333 22.99 2168 -37.20 994.11 -2.666.37 6.250 1,346.75 170,83 1,256al Pass - Major Risk 10,32500 8,593.00 8,40000 7.34254 22.99 21.82 -3104 1,00022 -2.501.16 5250 1,327.64 1]1.24 123862 Pass - Major Risk 10,337.14 8.59300 8,425.00 7.361.73 23.14 21.96 -30.33 1.008.33 -2.595.97 6.250 130SW 172.71 1.21686 Pass - Major Risk 10,35000 8,593.00 8.45000 7,390.91 23.30 22.11 -39.69 1.01246 -2,81078 6.260 1.289.76 174.18 1,19723 Pass - Major Risk 10,35000 8,593.00 8.475.00 7,400.09 2330 22.25 -3949 1,010.60 -2.625.60 6,250 1.270.99 17461 1,1830 Pass - Major Risk 10,36195 8,593.00 8,50000 7.41925 2344 22.39 -4070 1,024.76 -2.640.43 62W 1,252.35 175.94 1,15281 Pass - Major Risk 10,370.31 8.593.00 452500 7.438.41 2355 22.53 -41.46 1.030.93 -2,655.26 6,260 1,233.84 176.93 1,130.33 Paas - Major Risk 10,211 8.593.00 8.55000 ],45].55 23.61 22.66 -41.77 1.037.12 -2.670.00 6.250 1,215.47 177,65 1110.85 Pas. - Major Risk 10,387.11 8.59300 8.575.00 ].4]6.71 2376 2280 -42.94 1,043.30 -2.60092 Eno 1,197.21 17084 1,09965 Pas. - Mapr Risk 10400.00 8.593.00 6600.00 7.495.06 2]9] 22.93 -44.19 1,049.49 -2,69976 6250 1,17911 179.97 1.08059 Pass - Major Risk 10,400.00 8,593.00 8625.00 7.515.05 2393 23.04 -43.86 1.0$568 -2.714.53 6.206 118109 100.31 1.061.30 Pass - Mapr Risk 10,41229 8.593.00 8.65000 7,534.36 2108 23.14 -44.98 1,%1.03 -2,729.17 6.250 1,143.12 181.22 1.04235 Pass - Major Risk 1042500 8,593.00 8.67500 7,653.61 24.25 23.23 -46.13 1.067.96 -2.74363 8.250 1,125.22 18206 1,023,42 Pass -Major Risk 10425W 8.593.00 8,700.00 ],5]341 2425 23.32 -4512 1,074.05 -2,757.91 8.250 1.107.32 18235 100420 Pass - Major Risk 10.43878 0.593.00 0,725.00 7.593.06 24.40 23.43 -46.69 11000.11 -2,]]2.12 6.250 1009.53 183.12 98526 Pass -Major Risk 10.444.88 8,593,00 8,75000 7.612.70 2451 23.55 -47.20 1,088.18 -2,706.36 6.250 1,071.93 103.75 96537 Paaa - Major Risk 10AW.00 8.59300 0.]]500 7,63230 2458 2369 -47.32 1.09226 -2,80063 6.250 1.054.55 184.33 947.55 Pass - Major Risk 10,461.07 8,593.00 8800.00 ].6518] 24.72 2383 -48.13 1,090.35 -2,814.94 6.250 1.037.39 185.05 928.97 Pass -Major Risk 10.489.17 5,58]00 0,02500 7.67140 24.83 23.98 -48.54 1,104.47 -2.029.30 8.250 1,020.46 185.65 910.55 Pass - Major Risk 10.47500 8,59300 0,050.00 7,690.81 24.91 24.12 -48,68 1,110.59 -2,04360 8.250 1.003.70 186.18 89228 Pass - Major Risk 10.40528 8.59300 8,075.00 7,710,41 25.05 24.27 -49.28 1,110.73 2,858.07 6.260 901 186.75 87422 Paas - Major Risk 10.493.29 8.59300 0.900.00 7,729.90 25.15 24.41 49.59 1,122,86 287248 8.250 971.12 18724 855.34 Pass - Major Risk 10.500.00 0,593.00 0.925.00 7,74935 25.24 24.58 -4971 1.129.00 -2,880.94 8.250 955.20 18169 83868 Pa.. - Major Risk 10.50924 0,5%.c0 8,950.00 ],760.]4 253] 24.70 -50.10 1,135.15 -2,901.4] 6.250 939.58 188.12 82127 Paaa - Major Risk 10,517.19 0,593.0O 8,975.00 7,70009 25A7 24.05 50.29 1,14130 -2,916.% 6.250 92629 188.50 804.12 Pass - Major Risk 10,525.00 8,5%.00 9000.00 7,807.40 25.58 24.99 -50.44 1,147,45 -2,930.70 6.250 909.31 18885 78124 Pass - Major Risk 10,532.95 6.593.00 9,025.00 7,82870 25.68 25.14 5058 1,15360 -2,94534 8.250 8%,66 18917 ]]0.61 Pass - Maker Risk 111.54075 6,593.00 9,050.00 7,846.00 25.78 25.29 -5062 1,159.75 -2.960.00 8.250 8W.33 189.45 754.25 Pas. - Major Risk 10,550.00 059300 9,07500 7.865.30 25.91 25.43 -5081 1,165.91 -2,97465 5250 088.37 189.66 730.17 Pass - Major Risk 10,556.12 8,593.00 9,100.00 7,884.59 25.99 25.50 -5050 1,172.07 -2,98931 6.250 052.77 189.91 72246 Pass - Major Risk 10,56600 0.593.00 9,125.00 7,903.89 26.12 25.70 -50.76 1178.2] 3,001 6.250 639.56 189.92 70108 Pass - Major Risk 10,050.00 0,59229 9.15000 7,923.20 3006 25.80 -16.95 1.18439 -31018.80 6.250 022.11 20465 691.14 Pass - Major Risk 10.862.39 8.592.21 9.17500 7.942.52 30.23 2589 1185 1.190.53 -3.01 6250 004.13 2%.45 8]1.34 Pass - Major Risk 10,675.00 8,592.10 9,20000 7,961.85 MAI 2590 4835 1,196.68 -3.047.83 4A37 706.42 208.05 651.07 Pass - Major Risk 10,67500 8,592.10 9.22500 198120 30.41 26.08 4807 1,202.82 -3.0243 4A37 760.92 208.33 531.]8 Pass - Major Risk 10,88675 8.591.99 9,25000 8.000.53 30.50 2820 -10.77 1,208.97 -3.0]].04 4,437 751.80 209.97 612.31 Pass - Major Risk 10,69495 8.591.90 9.27500 8,019.04 3069 26.34 -1899 1.215.11 -3,09168 3562 ]34]3 211.15 592.94 Pass - Major Risk 10,90000 8,591.03 9,30000 8039.13 30.76 2648 -1830 1,22126 -3.10535 3.562 718.10 212.09 573.57 Pass - Major Risk 10,911.45 5.59168 9.32500 8.058,30 30.93 26.63 -1929 1,22740 -3.12108 3S62 ]01.]6 21351 554.63 Pass - Major Risk 10,919.74 8,591.55 9.35000 8,07182 31.05 28.70 19.37 1.23355 3.13560 3.562 685.78 21476 53583 Pass - Major Risk 10,925.00 8,59147 9.3750 8.09655 31.13 26.93 19.02 1,239.70 3.150.55 3562 670.18 215.68 517.20 Pass - Mapr Risk 10,93638 8,59128 9.400% 8.11804 3129 27.08 -19.34 1,24586 3.16533 3582 654.% 217.02 4911 Pass - Major Risk 10944.73 8.591.12 9.42500 8.13522 3142 2122 -1824 1,25202 -3.180.14 3562 640.16 210.07 48108 Pass - Major Risk 10,95000 8.591.02 9,450.00 8.154.30 3149 27.37 -1869 1,258.17 3.19498 3,562 625.81 210.07 46344 Pas. - Major Risk 10,961.43 8.59079 9,475.00 8.173.52 3165 27.52 -18.82 1.264.32 -3.209.83 1562 611.92 220.04 44620 Pas. - Map, Risk CC - Min centre to center distance or covergent point, SF - min Separation factor, ES - min ellipse separation 2/6/2017 1:02:42PM Page 18 COMPASS 5000.1 Build 818 i bBP p Travelling Cylinder Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore R -28A Database: Reference Design: R -28A WPO8 Offset TVD Reference: ri.S BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB R Pad - R-29 - R-29 - R-29 =am SRO Error: 5.og Ran survey Program: Q2 CT -MS Ruh Assigned: Major Risk ghat Well Eear: O.Wean Reference Offset aemi Major mia Measurad ihnical Measured Vertical Ross... West Tooiface♦ ONaat Wellbore Centre Casing- C.M. to No Oo Allo ons Warning Oepur Oeph onto 0epni Azimuth •1,114 rt`w Hole Size Centre Dnarers Deviation (Ran) lung IRSRI (Raft) lum) (gag) 11, (earn loan, (in) (ask) (Ran) (usft) 10.959.77 8.59060 9,50000 8,192.65 31.79 27.67 -10.50 1,27047 3]24]1 3,562 598.55 220.94 429.48 Pan - Major Rol, 10.975.00 059048 9.525.00 0,21177 31.87 27.00 -17.72 1.27661 4.23960 3582 58571 22161 413.18 Pess - Major Risk 10,986.40 8.59021 9.550.00 8.230.09 32.04 27.93 -17.62 1,282.72 -3.254.51 3,562 57341 222.52 397.36 Pass - Major Risk 10,994.89 8,59000 9.575.00 8,250.00 32.16 2907 -1705 1.289.81 -3,26943 3,562 561]2 22326 302.10 Pass - Major Risk 11,000.00 8,589.86 9,800.00 8,269.10 32.24 28.21 -16.06 1.29489 4284.37 3.582 550.69 223.85 367.51 Pass - Major Risk 11.011.16 8,509.55 9.62500 8,20921 3241 28.32 -15.69 1.30093 -3,29932 3.562 540.29 224.52 353.50 Pass Major Risk 11.019.33 8,509.32 9.650.00 9307.31 3253 28.45 -14.87 1.30695 -3.31427 3.552 530.80 225.07 34027 Pass - Major Risk 11,02500 0,509.15 9,675.00 0.32640 3262 20.58 -13.67 1.312.94 -3.329.26 3.562 521.70 22$.57 32192 Pass - Major Risk 11,035.54 8,500.82 9,700.00 8,345.53 3278 2989 -12.98 1,31991 -3,34421 3.562 513.56 226.00 31632 Paas - Major Risk 11,043.52 0,500.57 9.725.00 8,36472 3290 28.80 -11.91 1.324.81 -3.359.12 3.562 505.22 22636 305.71 Pass Motor Risk 11,05000 6.500.36 9,75000 0.303.91 32.89 2891 -1058 1,33069 -3.37401 3.562 499,75 226.60 29,522 Pass - Major Risk 11,05928 6.500.04 9,775.00 0.403.14 33.13 2801 -9.02 1,336.52 -3.38869 3.562 494.18 226.93 20.63 Paas - Major Risk 11,067.06 855777 8,00000 042238 33.25 29.13 -823 1.34230 -340377 3.562 489.52 227.16 28026 Pass - Major Risk 11.075.00 0,50748 9,02500 0,44104 33.37 2923 -6,90 1.346.04 -341863 3.552 485.83 22782 274.10 Pass Major Risk 11,082.38 0.587.21 9.05000 0,46093 3340 29.35 -547 1.35374 -3.43349 3.662 483.12 227.40 269.23 Pass Major Risk 11,089.93 0,586.93 9,075.00 0,40022 33.59 2946 -403 1,359.40 -3.448.34 3.562 481.42 22760 26585 Pass - Major Risk 11,100.00 0,586.53 9,900.00 0.499.55 3374 2967 -20B 1,365.01 -3.463.17 3.562 480,74 227.56 263.18 Pass - Major Risk 11,10000 0,588.53 9,92500 0.518.91 33.74 2868 -046 1370.57 -3477.98 3.562 481.12 227.07 26321 Paas - Major Risk 11,11206 0.506.05 9,950W 0.538.30 33.92 2978 045 1,376.11 -3492,76 3.582 482.46 227.63 263.22 Pass - Major Risk 11,119.25 8.585]5 9,97500 955770 34.02 29.90 1.95 1.38165 -3507.52 3.562 494.93 227.60 265.22 Pass Major Risk 11,406.00 8,573.51 10.000.00 0,577.03 3935 30.03 38.54 1.30732 '3,522.32 3.502 486.33 243.54 25564 Pass - Mejor Risk 11,416.87 8,573.09 10.025.00 0.596.15 38.51 30.10 39.56 1,393.26 -3.537,30 3.582 48251 245.57 250.27 Pess - Major Risk 1142500 8,572.02 10.05000 0,615.02 3063 3033 4081 1399.51 -3,55246 3.562 479.80 247.16 246.22 Pass - Major Risk 11,432.61 8.57259 10.05.00 953373 30,76 30.49 4231 140594 -368775 3562 478.35 248.65 243.58 Pass - Major Risk 11,440.79 8.572.37 10.100.00 8.652.34 30.07 30.64 43.65 141246 -3.503.11 3662 477.87 250.18 242.36 Pass- Major Risk, CC, Es. SF 11,45000 8,572.16 10,125.00 8.670,94 39.01 3019 44.84 1.418.97 3.598.50 3,562 478,410 25176 242.57 Pass - Major Risk 11457.55 9572.01 10,15000 8,689,53 39.12 30.93 4622 142545 3.613.90 3562 479.92 25306 244.13 Paas -Mi Risk 11466.10 8.571.87 10,17500 8.709.14 39.25 31.06 47,45 143184 3,629.33 3562 482.36 25040 247.02 Pass - Major Risk M475,00 8,571.77 10.20000 8,726.74 39.39 31.20 48.60 1.438.14 -3.644,79 3562 405.71 255.72 251.14 Pass - Major Risk 11,483.57 8.571.70 10.22500 8.745.32 39.52 31.34 49.75 1,444.39 -3.66031 3.562 409.93 25700 25841 Pass - Mi Risk 11,492.53 8,57166 10.25000 8,763.83 3986 31.50 5078 1,450.63 3,675.91 3,562 495.02 25828 26278 Pass - Major Risk 11,500.00 9571.66 10.27500 8.782.27 39.70 31.66 51.92 1.456.89 3.691.59 3.562 500.0 25938 27027 Pass Major Risk 1151091 8.57109 10.30000 8,800.64 39.95 3182 52.59 1463.18 3,70734 3.562 507.71 26072 27967 Paas - Major Risk 1152032 8.57177 10.32500 9,919.94 40.10 31.99 53.35 140944 3,723.18 3.562 515.22 261.86 28803 Pass Major Risk 11,52988 8,571.89 10.35000 8,037.17 40.25 32.15 54.01 1.47573 3,73909 3.562 523.45 262.93 298.25 Pass - Major Risk 11,53958 8.57205 10.37500 8855.33 4040 32.32 54.58 1,48204 -3.755.06 3.582 532.37 263.95 30936 Pass - Major Risk 11.55000 8,572.26 10.400.00 8,0346 4057 3248 54.97 1.48838 4]7107 3.552 Sales 264.90 32098 Pass - Major Risk 1155920 8.072.50 1042500 8,891.56 40]1 3264 $542 1,494.76 -3,787.09 3.552 552.25 265.72 33348 Pass - Mejor Risk 11.56920 8.57279 10.45000 8,909.84 40.87 32.79 55.69 1.W1.19 3,803.11 3.562 563.15 266.47 34661 Paas - Major Risk 11,579.35 9.573.13 10.475.00 8,92770 4103 32.95 55.88 1,W769 4.91914 3.582 57666 267.14 360.33 Pass - Mani Rlsk 11,50940 9,573.52 10.500.00 0,94573 41.19 33.10 55.98 1,51123 -3.835.17 3.562 586,72 267.71 374.57 Pass - Malo, Risk 11.600.00 8.573.97 10.525.00 0.96375 4138 33.25 55.95 1.52081 -3.85120 3,682 599.29 260.21 30925 Pass - Major Risk 11,759.07 0,59146 10,550.00 0,901.74 4398 3341 74.05 1,527.42 -3.86725 3.662 611.47 275,71 396.17 Pass - Major Risk 11.013.42 8,593.82 10.575.00 0,999.72 44.70 33.57 7990 1.534.09 -3.88329 3.562 61945 275.30 4W.79 Paas - Mejor Risk 11,025.00 0,584.28 10,80009 9,01776 4487 3371 97.10 1,540.92 -3,89934 3.562 628.15 277.56 417.58 Paso -Meloy Risk 11.83042 8.58448 1062500 9,03563 44.95 3380 80.84 1,54778 -3,91529 3.562 637,39 27964 42900 Pacs - Mejor Risk 11.830.95 8.584]0 1065000 9,06357 45.08 3389 81.17 1.554,62 -3.93129 3.562 6227 280.14 441.16 Pass - Mejor Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1: 02,42PM Page 19 COMPASS 5000.1 Build 818 BP rel.d r by Travelling Cylinder Report BAKER m HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB R Pad Site Error: 0.00 usft Reference Well: R-28 Well Error: 0.00 usft Reference Wellbore R -28A Reference Design: R -28A WPO8 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output en'ors are at Database: Offset TVD Reference: Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB R Pad - R-28 - R-29 - R-29 onset ane error; o.W.sft 8..'Program: 42 -GCT -MS Rule Asthma: Myor Risk Man soon Enon 0.00tift Reference me Semi Mafor Axla Measured Vertical Menen.4 Vaunt Reference onart restrain ♦ Offset Weliboreceere Casing- Centra to No Da Allevvbls Wamine Depth Depth Depth Depth Azimuth ♦1,145 + -W Hole aha cars. Distance Deviation (..it) (.ra) (ean) (..it) (..it) (us") 1°I fusel (ien) (in) (.eft) loan) loft) 11.850.00 0,505.14 10,67500 9.071.50 4525 33.90 81.15 1.56148 -3.94.30 3.562 657.74 281.91 45393 Pass-Melor Risk 11,856.10 0,505.32 10,70000 9.089.44 45.35 34.06 8154 1,56084 -3,963.31 3.562 668.73 28298 467.25 P8as-Mepr Risk 11,86480 8,505.55 10,725.00 9,10788 45.40 34.15 81.79 1,575.19 $979.31 3.562 680.25 28418 48109 Pan - Mapr Risk 11.875.00 $58581 10,750.00 9,125.32 45.65 34.24 81.68 1,502.05 -3,995.32 3,662 692.27 205.71 495.38 Pon -Major Risk CC - Min centre to center distance or covergenl point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1:02:42PM Page 20 COMPASS 5000.1 Build 81B I ( BP j p Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 usft Output enore are at Reference Wellbore R -28A Database: Reference Design: R -28A WPO8 Offset TVD Reference: rias BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCPi Offset Datum Offset Design PBR Pad- R-29 - R -29A - R -29A Offset ane Ener: 010.9 Survey Program: 42-GC&MS, 10041 -MWD Rule Assigned: Minor 1/10 Olne1110 E.I. 0.00 us8 inference man Semi Major mi. Measured Vertical Measuerd Vertical Reference, Ofted Tooffacea Offset WvllbareCarrtra ceding- centmtd No Go A119Webe V6ming Depth Oepsh Depth Rapids AdrinulM1 ew-g eVi Role, Side, career Oiduxe Elevlen. tuft) (uan) (ran) (ien) (waft) (..ft) (11 (usn) Iden) ilei (waft) (usft) (use) 10304.03 0.593.00 8.325.00 7,20009 22.76 21.43 -3504 98197 -2,53670 6.250 1,36529 12,26 1,384.77 Pass - Minor 1110 10.31201 8,593.00 8,350.00 7,304.12 22.05 21.55 -35.87 900.03 .2.551,57 6,250 1,36595 12.24 1,36544 Pass - Minor 1/10 10,32500 8593.00 8,375.00 7,323.33 22.99 21.60 -37.20 994.11 -2.566.37 6.250 1.348]5 1220 1.34523 Pass - Minor 1/10 10.32500 8,59300 0,400.00 7.342.54 22.99 21.82 -37.04 1.00022 -2,581.16 6260 1,327.64 12.20 1.327.12 Pass - Minor 1/10 10.337.14 8.59300 0.42500 7.361.73 23.14 2198 -38.33 1006.33 -2,595.97 6250 1,308.63 12.16 1.300.11 Pass - Minor 1/10 10,350.00 8.593.00 0,450.00 7,300.91 23.30 22.11 -3969 1,01246 -2.61078 5250 1,299.76 12.11 1.209.24 Pass -Minor 1/10 10,350.00 9,593.00 0475.00 7.400.09 23.30 22.25 -3949 1,0186) -2.62560 6.250 1,27099 12.11 1,27047 Pass Minmt/10 1036196 0,59300 8,50000 7,419.25 2344 22.39 -40.70 1.02476 -2.640.43 6.250 1,252.35 12.06 1,25182 Paas-Minort/ID 10,370.31 8.593.00 0.52500 7.43041 2365 2253 .4146 1,03093 -2,655.26 6.250 1.233.84 12.02 1,23331 Pau -Minor V10 10.375.00 8593.00 8550.00 7,457.56 23.61 22.66 41.77 1,037.12 -2.67008 6.250 1.21547 R00 1,21494 Paas-Minort110 10.387.11 8,59300 0.57500 7.47671 2376 nod 4294 1,04330 -2,684.92 6.250 1.197.21 11.95 1,196.69 Pa..- Minor t/10 10,400.00 8,59300 6.600.00 7.495.06 2393 22.93 44.19 1,04949 -2.699.76 6.250 1,179.11 11.09 1.178.59 Pass - Minor 1110 10,400.00 8,59300 8,625.00 7.515.05 2393 2304 4386 1105565 -2,71453 6,250 1,161.09 11.09 1,160.57 Pass - Minor 1110 10.41239 6,59300 9.85000 7,534.36 24.08 23.14 4490 1.061.83 3,729.17 6250 1.143.12 11.63 1,142.60 Pass - Minor 1110 1042500 0,593,00 8,875.00 7,553.81 2425 23.23 4613 1,007.96 -2,74363 6.250 1.125.22 1177 1,12489 Pass - Minor 1110 1042500 0.593.00 8.70000 7.57341 2425 2332 -45.72 1,074.05 -2,757.91 6.250 1.107.32 1177 1.106 80 Paas - Minor 1110 10,436.79 0.593.00 8.72500 7,593.06 2440 23.43 -46.69 11000.11 -2,772.12 6250 1.089.53 1172 1.089.01 Paas - Minor 1110 10.444.08 0.593.00 8.750.00 7.612.70 24.51 23.55 47.20 1,008.10 -2,786.36 8250 1,071.93 1160 1,071.41 Pass - Minor 1/10 10450.00 6,593.00 8,77500 7,632.30 24.58 2369 -47.32 1.09228 -2000.63 6250 1,05056 1166 1.054.03 Pass -M'nor 1110 10.461.07 0,593.00 880000 7,85197 24.72 23.03 -48.13 1.090.35 -2,01494 6,250 1.03739 1181 1036.86 Pass -M'nar 1110 10,469:17 0,593.00 8,825.00 7,67140 24.93 23.90 -48.54 1,104.47 -2.029.30 6.250 1.02046 11.57 101994 Pass - Miner 1/10 10,475.00 0.593.00 8.850.00 7,69091 2691 24.12 4888 1,110.59 -2.M3.68 6250 1,00378 11.54 1,00326 Pass - Minor 1/10 10,465.26 8,593.00 8,97500 7,71041 25.05 24.27 -4920 1,11673 2.85807 6250 98732 11.49 986.80 Pass - Minor 1/10 10493.29 8,593.00 8,90000 7.72990 25.15 2041 -49.59 1,122.86 2.872.48 6.250 971.12 11.45 970.60 Pass- Minor 1/10 10,500.00 0,593.00 0.925.00 7.74935 2524 24.56 -4971 1.129.00 2,886.94 6.250 95520 11.41 954.68 Pass - Minor 1/10 10,509,24 8,593.00 0.95000 7.768.74 25.37 2470 -50.10 1,135.15 3,90147 6250 939.58 11.36 939.06 Pass - Minor 1/10 10,517.19 8,593.00 0,975.00 7.700.09 25.47 24.65 -5029 1,14130 391686 8.20 924.29 11.32 92377 Pass - Minor 1/10 10,52500 8,59300 9.000.00 7,00740 25.58 24.99 -5044 1,14745 -393070 8250 909.31 11.28 908.79 Pass - Minor 1/10 10.532.95 9.59300 9,025,00 7,02670 25.68 25.14 -50.56 1.15360 -2.94534 6250 89486 1123 094.14 Pass - Minor 1110 10.54075 8.59300 9,050.00 7,046.00 25.78 25.29 -50.62 1,15975 -2.96000 6,250 000.33 11.19 07981 Pas. - Minor 1110 10.550.00 8.593.00 9.075.00 7.865.30 2591 2543 -50.81 1,165.91 -2.974.65 6.250 056.37 11.13 865.84 Pass - Minor 1110 10,556.12 8.59300 9.100.00 7.984.59 2599 2558 50.50 1.172.07 -2,999.31 6.250 052.77 11.09 05224 Pass -Minor 1110 10,566.00 0.593.00 9.125.00 7,903.69 26,12 2570 -50.76 1,176.23 -3,003.96 6.250 839.56 1103 839.04 Pan - Minor 1110 10,950.00 8,59229 9,150.00 7,923.20 3006 25.00 -1695 1,184.39 -3,018.80 6.250 922.11 14.51 821.59 Pass - Minor t/10 10,86239 8,59221 9,17500 7,942.52 30.23 25.89 17,85 1,190.53 -3,033.22 6250 804.13 1449 80361 Pass - Minor 1110 1000500 8.592.10 8200.00 71961.85 30.41 25.98 18.75 1.196.60 -3.047.03 4,437 781342 1429 786.05 Pau - Minor 1/10 10.07500 8.592.10 9,225.00 7,991.20 3041 26.00 -19.07 1.202.82 -3,06243 4,437 76892 14.29 768.55 Pass - Minor 1110 10,88675 8,59199 9.250.00 6,000.53 30.50 26.20 -18.77 1,20897 -3,077.04 4437 751.68 14.25 751,31 Pass - Minor 1110 10,69495 0,59190 9,27500 81 3069 26.34 -18.99 1.215.11 -3.0918B 3562 73473 14.15 73443 Pass - Minor 1110 10190000 8,59183 9300.00 8039.13 30.76 26.40 -10.78 1.221.26 -3.10635 3,562 718.10 14.13 717.80 Pass - Minor 1110 10.91145 8,59168 9,32500 805838 30.93 2863 -19.29 1,227.40 -3.12105 3562 70118 14,09 70146 Paas - Mina, 1/10 10,919,74 0,591.55 9,35000 8,077.62 31.05 2678 -19.37 1,233.55 43,13590 3.562 685.78 1405 68549 Pass - Minor 1110 10.925.00 0,59147 9,375.00 0.09685 31.13 26.93 -19.02 1,23970 -3.15055 3.562 670.18 1403 669.89 Pass - Minor 1110 10.936.30 8,591,28 9,400.00 8.11604 3129 2208 -19.34 1,245.86 -3,16533 3.562 654.% 1397 85156 Pass - Minor 1110 10.94473 8,591.12 942500 8,135.22 3142 27,22 4924 1,252.02 43,180.14 3.562 640.16 1393 639.96 Pass - Minor 1110 10,95000 8,59102 9,450.00 8,154.38 3149 27.37 4869 1,251 -3,11)1 3.562 625.81 1390 62552 Pass - Minor 1110 10,98143 0.590.79 947500 8.173.52 31.66 27.52 4882 1,26432 -3,209.93 3.562 611.92 1384 61162 Pass Minor 1110 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 21612017 1:02:42PM Page 21 COMPASS 5000.1 Build 81B I ( bBP p Travelling Cylinder Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay ND Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 Daft Output errors are at Reference Wellbore R -28A Database: Reference Design: R-28AWP08 Offset TVD Reference: wed RV BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING (ova 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB R Pad - R-29 - R -29A - R -29A Met arcs arm: 0.09 unit Survey Pm9ram: 42 -GCT -Me, 10041 -MWD RUM Asel9natl: Minor i/10 Met Well Enron 0.00 an R.N... Met Sual Malo'Axi. Mamoru! Vuliml Manama Vertical Reference Onset Turks.. West Walloon Centro caalna- Co."ip soon Allowable Wamin9 Depth Depth Depth Depth ".urn 4a0g aV e, Hole BW Centre OMtanu OeAstion (onft) (oan) (nert) IDM) (UM) loan) 1°I (Dani loaft) (in) (Daft (arm Imft) 10,96977 8,59060 9,50000 8192.65 31.79 27.67 -1659 1,27047 -3.224.71 3.562 598.55 13.79 $9825 Pass - Minor 1110 10,975.00 8,590,48 9,525.00 8,21177 31.87 27.80 -17,72 1.276,51 -3,23960 3.562 585.71 13.76 505,41 Pas. Minor 1110 10,98640 0,590.21 9,55000 8,230,89 32.04 27.93 -17,62 1.282.72 -3.254S1 3.562 57341 13.69 573.11 Pass - Minor 1110 10.994.69 8,590.00 9.575.00 8,250.00 32.16 20.07 -17.06 1.200.81 -3.269.43 3.562 561.72 1363 59142 Pass - Minor 1110 1100000 8,58986 9,60000 0,269.10 3234 28.21 -1608 1,294.89 -3.204.37 3.562 550.69 1360 SW 39 Pass � Minor 1110 11,011.16 8,58955 9,625.00 0,288.21 3241 28.32 -1569 1,300,93 -3,29932 3.562 540.20 13.54 539.98 Pan - Minor 1110 11,019.33 8.589.32 9,650.00 6307.31 32.53 20.45 -14.87 1.306.95 -3,31427 3.582 530.60 13.50 530.31 Pass -Minor 1110 11,025.00 0.589.15 9,675.00 0,326.40 3262 20.58 4357 1,312.94 -3,329.26 3.562 52170 1146 521.40 Pass -Minor 1110 11.03554 8,588.82 9,700.00 0,345.53 3278 2869 -12.98 1,310.91 -3,344.21 3.562 513.56 1340 51326 Pass - Minor 1110 11.043.52 0,588.57 9,725.00 0,364.72 32.90 20.00 11.91 1.324.81 -31359.12 3562 508.22 1334 505.92 Pass - Motor 1110 11.050.00 0,588.36 9.750.00 &363.81 3299 20.91 -10.58 1.330.69 -3.37/01 3562 49975 1330 49946 Pass -Minor 1110 11,05928 0,588.04 9,775.00 8,403.14 33.13 29.01 -9.52 1,336.62 -3.30089 3562 494.18 1324 493.88 Pass - Minor 1110 11,05706 858777 9,000.00 0,422.38 3325 29.13 -823 1,342.30 -3.403,77 3,562 489.52 13.19 48923 Pau - Minor 1110 11.07500 8,587.48 9.82500 0,44164 3337 29.23 -6.90 1,348.04 -3,41863 3.562 485.83 13.13 485.53 Pae. - Minor 1/10 11,002.38 8.587.21 9,850011 8,48093 3348 29.35 -5.47 1,35374 3.43349 3562 483.12 13.07 482.02 Pass - Minor 1/10 11,009.93 8,586.93 9.075.00 0,480.22 3359 2046 .4.03 1,359.40 -3.448.34 3,552 48142 13.02 481.13 Pau - Minor 1/10 11.100.00 8,586.53 9,90000 0.499.55 3374 29.57 -2.00 1.365.01 -3,463.17 3,562 48074 12.94 48045 Pass -Minor 1/10 11.100.00 8,585.53 9,92500 6518.91 33.74 2960 -046 1,370.57 -3.477.90 3,562 481.12 12.94 480.83 Pass - Minor 1110 11.112.06 8,585.05 9,95000 8,530.30 33.92 29.70 0.45 1,378.11 -3,49276 3.562 48246 12.04 482.16 Paas- Minor 1110 11.119.25 8,58575 9.97500 655770 34.02 29.90 1.95 1,381,65 -150752 3562 484.93 12.78 48463 Pass - Minor 1110 11,350.00 8,575.01 11,325.00 8780.51 37.53 30.56 -169.02 505.44 4.072.12 3.562 589.11 066 580.97 Pass - Minor 1/10 11,350.00 8,575.01 11,35000 8.790.39 37.53 30.57 -169.13 48387 -4,079.% 3.552 613.54 0.61 605.44 Pass -Minor 1/10 11,350.00 8,575.81 11,37500 8,001.12 37.53 3057 -16932 463.21 4.00909 3.562 638.21 857 63015 Pass - Minor 1110 11,350.00 8.575.01 11400.00 9.81249 37.53 30.57 -169.511 44345 -4099.35 3,562 662.99 8.53 654.98 Pass - Minor 1110 11,350.00 8,575.01 11,42500 8.024.37 3753 30.58 -169.83 424.54 4,110.56 3,562 667.77 049 679.82 Pass - Minor 1110 11.%0.00 8,575.01 11,450.00 8.037.35 37.53 3058 -170.18 406.90 4,122.61 3562 712.38 844 70450 Pass - Minor 1/10 11350.00 8,575,81 11475.00 8,850.86 37.53 30.59 -17057 39045 4.13571 3.562 736.79 840 72899 Pass- Minor 1110 11,387.00 8.575.81 11,500.00 8,86540 37.53 3061 -171.03 37500 4,140.93 3.562 760.91 8.35 753.20 Pas, - Minor 1110 11.350.00 8,575.81 11.52500 688099 37.53 3062 -171.56 36070 4,162.24 .3.562 70465 831 777.03 Pass - Minor 1110 11,35).00 8,575.01 11,550.00 8,69730 3753 30.64 -172.13 34784 -4.96.14 3.562 007.95 8.26 00043 Pass - Minor 1110 11,350.00 8,575.81 11,575.00 8.91434 37.53 3066 -172.76 33651 -4.190.51 3.562 030.70 8.21 82329 Pass - Minot 1110 11356.58 8,575.54 11.300.00 077123 37.63 3056 -168.13 52767 -4065.45 3.552 564.95 870 6M73 Pass - Minor 1110 11,358.42 8,57546 11,80000 8,931.85 3765 30.68 172.35 32573 -4.20542 3.562 052.78 8.16 84543 Pass - Minor 1110 11,36040 8.575.30 11,27500 8,76258 37.611 30.57 -16765 550.51 -4,059.97 3.552 "I'M 875 53299 Pass Minor 1/10 11,361.20 8,575.35 11.62500 8,949.92 37.69 3071 -172.60 31849 -4,22044 3.552 874.41 0.11 85716 Pas. - Minor 1/10 11,364.13 8575.22 11,65000 8,96874 3774 3075 -93.03 31107 -4,23526 3.562 895.37 8.06 08823 Pass - Minor 1110 11.365.00 8,575.10 11,250.00 6.755.09 3775 30.57 167.16 573.96 4,05579 3.562 518.17 8.81 509.85 Pass - Minor 1110 11367.14 8.575.10 11,67500 0.988.48 3770 3078 -93.44 305.55 -4,249.55 3.562 915.48 601 908.46 Pass - Minor 1110 11,37500 8.57477 1120000 8.74275 37.90 30.57 -166.41 622.19 -4,05140 3.562 474.46 093 466.05 Pass - Minor 1110 17375.00 8,574,4 11,22500 0748.54 37.90 30.57 166.12 597.92 4,05302 3.582 495.92 806 487.51 Pa.. - Minor 1110 11,375.00 8,574.77 11700.00 9,00931 37.90 3082 -9332 301.39 -4,262.73 3582 93478 7.97 927.85 Pass - Minor 1110 11,384.45 8,574.38 11.17500 8,73750 36.04 30.57 -165.50 616.62 -4,05098 3,562 453.02 0.99 445.36 Pass - Minor 1110 11,392.39 8.57406 11.150.00 0,732.72 38.16 30.58 -165.01 671.16 -4,05130 31562 43392 9.06 425.42 Pass - Minor 1110 11,400.00 8.67375 11,125.00 0,72873 3827 30.50 -16451 695.04 4,051.46 3.562 41450 9.12 405.911 Pass - Minor 1/10 1140600 8.573.51 10000.00 8,577.03 3836 30.03 3854 1,307.32 -3.52232 3.562 48633 1662 486.03 Pass - Minor 1110 11418.86 8,573.09 10.025,00 8,596.15 3851 30.14 39.56 1,393.28 -3,53730 3.562 49251 14,15 482.21 Pass - Minor 1110 11425.00 8.57282 10.050.00 0,614.91 3863 30.18 4090 1,399.54 -3.55258 3.562 47982 1203 479.52 Pass - Minor 1110 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1:02:42PM Page 22 COMPASS 5000.1 Build 81B r lsaq� BP .� p Travelling Cylinder Report t0l Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay Ti Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 Usti North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 wait Output errors are at Reference Wellbore R -28A Database: Reference Design: R -28A WPO8 Offset TVD Reference: WARS BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB R Pad - R-29 - R -29A- R -29A Grrset SRa Econ 000ue8 Survey Program: 42 -GCT -MS, 10041 -MW➢ RUN Assigrn@M1nor 1110 Offset Was Error: 000 Use Reference West Semilib Aalz Measured Vertlwl Mansions VMical Refs... greet T.9m. Offeet Wellbore Ce Mn Castle- Co.,. to No Go Assemble Warning Depth Depth Depth Depth "ohdin +N/S eel -W Hole film Calvin Distance Deviation Just) lust) Iustl (wat) ("i (uso) V) (ush) Juan) lint (nt) lust) lull) 11433.12 8.572.57 10.07500 8.63246 38.75 30.20 42.13 1,405.17 -3,56944 3.562 476.60 12.04 47630 Pass - Minor 1110 1144129 8.57236 11,100.00 8,725.74 3838 3059 -168.06 72054 -4,05223 3.562 39570 9.57 38.77 Pass - Minor 1110 11,442.16 867233 10.100.00 884841 3889 3020 43.13 1,40949 -3.580.17 3562 472.02 12.04 47172 Pass - Minor 1110 11,450.00 8.572.16 10.125.00 0,661.20 39.01 30.22 43.90 1,415.66 -3.608.71 3,562 468.36 1201 46806 Pass - Minor Ill 11,464.211 8.571.90 10,150.00 8,67068 3923 30.23 43.57 1,421.09 -3.631.17 3.562 463.21 12.03 462.92 Pass - Minor Ill 1147500 8,57177 10.175.00 8,676.70 39.39 30.26 43.30 1,42509 -3,655.00 3582 456.12 1200 455.82 Pass - Minor ilio 11,408713 8,57157 10,20000 0.87874 3960 30.20 42.22 1,428.14 3,679.77 3.562 44754 11.98 44725 Pass - Minor 1110 11.50000 0,57166 10,225.00 9,677.20 39.78 30.32 4102 1.430.04 3.70464 3.562 43761 1184 437.31 Pan - Minor 1110 11,50630 0.571.67 11,075.00 9,723.30 39.00 30.60 -17T49 745.50 4.053.36 3.562 37553 10.22 366.04 Pass - Minor 1110 11,51336 0,57171 10,250.00 9,674.94 39.99 30.35 39.53 142914 -3,729.50 3.552 42551 1191 42531 Pam - Minor 1110 11.525.00 0.571.82 10.275.00 8.675.05 40.17 30.39 30.63 1.425.52 -3.75421 3.562 412.34 1186 41205 Pam - Minor 1110 11,535.93 0.571.98 10,300.00 8,676,24 40.34 3042 38.08 1,418.33 -3.778.10 3.562 397.00 1185 396.70 Pass - Minor 1110 11,545,71 0,572.17 10,325.00 8677.12 40.50 30.46 37.77 1,407.61 -3,80064 3.562 379.37 11.82 379.07 Pass - Minor 1110 11549.51 6,57225 11050.00 0.721.42 4058 3080 170.35 77041 -4.054.35 3.82 354.27 10.57 344.54 Pass - Minor 1110 11,553.93 9.57236 10.350.00 8.677.10 4063 3048 37,69 1,39322 -3,821.04 3.562 359.33 1179 359.04 Pass - Minor Ill 11,561.19 8.572.55 10.375.00 8.676.67 4074 30.51 37.83 1.37873 -3,839.83 3562 330.14 11.77 337.84 Pass - Minor 1110 11,569.50 8,572.77 10,400.00 8,676.32 40.86 3053 38.11 1.359.75 -3.058.17 3,502 31594 11,76 316.64 Pass - Minor 1/10 11,575.00 9,572.98 10,425.00 8,67546 4096 30.55 38.56 1.342.24 -3.875.99 3,562 29555 11.73 29525 Pass - Minor 1/10 11,580.46 9,573.10 11,025.00 0,719.82 41.05 30.61 171.44 795.33 4,055.47 3,562 332.58 1078 32277 Pass - Minor 1/10 11.58297 8.573.27 10450.00 0.67499 4109 30.57 39.12 1,324.05 3,893.13 3562 274.19 11.71 273.89 Pass - Minor 1/10 11,590.15 8.573.55 10475.00 867542 41.20 30.59 4022 1.305.35 3.915871 3,562 25325 11.69 252.95 Pass - Minor Ill 11,59741 8.57366 10,500.00 867647 4132 3060 41.81 1.206.25 -3.92581 3.562 23283 1167 23253 Pass - Minor 1110 11,604.51 8,57419 11,00000 11,710.31 41.43 3062 167.13 820.23 -4,057,05 3.562 310.79 10.91 30.99 Pass - Minor VID 11.60473 8,574.19 10.525.00 9.6885 41.43 3082 4393 1.26673 3941.37 3.562 212.8 11.64 212.8 Pass - Minor 1110 11.6108 0,57449 10.97500 8,716.79 41.53 30.62 16571 845.11 4,05904 3.82 209.22 11.02 279.49 Pass - Minor 1110 11.61627 0,57474 10.95000 8.71492 41.61 30.63 164.24 069.99 406050 3.562 267.76 11.12 258.13 Pan - Minor 1/10 11.61770 057451 10.55000 8.679.47 41.64 30.64 48.78 1,246.71 -3956.25 3.562 193.64 11.72 193.35 Pass - Minor 1110 11,621,25 0,574.98 10,92500 8,712.80 ales 30.64 16240 894.89 -4,060.95 3.562 246.42 11.21 236.95 Pass - Minor 1110 11,825.00 8.575.16 18900,00 8.71060 4175 3085 Issas 91979 -4,011 3.562 225.42 11.29 216.19 Pass - Minor 1110 11,628.75 0.575.33 10,575.00 0.68080 4181 3065 54.54 1.226.07 -3,970.20 3,662 17468 11]9 174.38 Pa.. - Minor 1/10 11.630.81 8.575.43 10,075.00 0,70828 4185 3066 157.17 944.67 -4,059.71 3,562 20506 11.39 196.16 Pass - Minor t/10 11,635.35 9,57565 10,050.00 9,70586 41.92 30.67 15361 89.45 4.058.10 3.562 185.13 1147 176.69 Pass - Minor 1/10 11.63647 8,57570 10,60000 8601.63 41.94 30.66 60.99 1,204.62 -3.983.10 3.562 15636 11.83 155.06 Pass - Minor 1/10 11.63949 9.575.05 10,82500 8701.95 41.90 30.60 149.11 994.00 -4,055.54 3.562 16596 11.55 158.16 Pass - Minor 1110 11639.03 8.575.86 11725.00 9.030.93 4199 30.05 17ol3 290.05 -4274.8 3.562 95322 9.77 944.]8 Pass - Minor Ill 1164157 8.575.94 10.62500 8.60226 42.02 3067 6859 1,18251 3894,73 3.662 13957 11.84 13927 Pass - Minor 1110 11.64274 8,576.0 10.800.00 8,690.15 42.8 3068 143.30 1.01846 4,051.53 3.582 147.97 11.62 14108 Pass - Minor 1110 11,644.92 8,576.10 1065000 8,83.10 42.07 30.60 77.88 1.159.95 -4,005.46 3.562 12562 11.04 125.33 Pass - Minor 1110 11,64520 8.576,12 10,77500 869451 42.07 30.69 135.89 1.042.63 -4.046.30 3.82 132.20 1167 12669 Pass Minor 1110 11,847.05 8,67620 10,75000 069140 42.10 3069 125.98 1,08068 -4,040.14 3562 120.23 11.73 116.44 Pass Minor 1110 11,64700 0,576.21 10,675.00 0,69462 42.10 3069 09.03 1 13709 -4,01549 3 562 115.09 11.02 115.59 Pass Minor 1110 11,648,19 8,576,26 10,85.00 0.699.76 42.12 3089 114.34 1,09049 -4,03305 SS62 113.00 1177 111.49 Pass - Minor 1110 11.840.21 8,576.26 10,700.00 0,686.51 4212 3069 101.50 1,11396 4,024.78 3582 11149 1400 111.19 Pass- Minor 1110, CC, ES, SF 11.650.00 0,576.34 11,75000 9,053.08 42.15 3088 170.34 295.54 4.20614 3.562 989.07 979 96072 Pass - Minor 1110 11,650.00 8576.34 11,775.00 9,075.92 42.15 3091 169.8 293.58 4,296.09 3,562 90470 976 97649 Pau - Minor 1110 11,650.00 0,576.34 11,00000 9,09921 42.15 30.93 168.36 291.09 1.305.01 3.562 1.00045 1352 986.91 Pa.. - Minor Ill 11,650.00 0.576.34 11,015,00 9,113.19 42.15 30.94 167.78 290.07 4,310.36 3.562 1.010.08 17,75 99279 Pass - Minor Ill CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/62017 1:02:42PM Page 23 COMPASS 5000.1 Build 81B b BP ER p Travelling Cylinder Report BAKER HUGHES Company: North America -ALASKA - BP Local Co-ordinate Reference: Well R-28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB R Pad MD Reference: ORIG KELLY BUSHING @ 51.20usft (DOYON 16) Site Error: 0.00 usft North Reference: True Reference Well: R-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore R -28A Database: EDM RSK- Alaska PROD -ANCP1 Reference Design: R -28A WPOB Offset TVD Reference: Offset Datum CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 216@017 1:02:42PM Page 24 COMPASS 5000.1 Build 81B F�nae BP As4L°� p Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore R -28A Database: Reference Design: R -28A WPO8 Offset TVD Reference: HAS BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Offset Design PBRPad- R-30-R-30A-R-30AWP10 Oe.Msge Ener: GW it Survey Program: 42 -GCT -M6, 10971 -MWD Rule Assigned: Major Risk Offset Wall Emen amusft Reference West 8enl Major Axis Measured Venial Measured Vertical Reference ONeet Tooifien. Onset Wasson Centre casing- Canireb No Go Allosiele Mining Depth Depth Goods Gallen AnnWM1 sNl4 AV.w Hole BW Centre Dlstmn Deviation (.eft) (een) turn Nairn (j luau) 0 (sell lump (in) (usft) (um) (wk) 11,467.81 8,67185 14,415.00 8,629.35 3928 50.17 3525 167561 -3.40633 3.562 ]4].54 322.75 42566 Pas.- Major Risk, CC, ES. SF 11,475.00 0,571.77 14,32500 8.629.15 3838 Saw 33.96 1.76430 -3.471.86 3.562 83138 32322 508.46 Pass. Major Risk 11,475.00 8,571.77 14350.00 8629.23 39.39 50.11 34.07 1,73942 -3.474.20 3562 80858 323.30 485.95 Pass - Major Risk 11,475.00 0,571,77 14.375.00 8.629.29 3939 50.14 34.19 1,714.69 3,477.84 3,562 70542 323.51 463.08 Pass - Major Risk 11.475.00 0,571.77 14.400.00 8,629,33 39.39 58.16 632 1690.18 -3,482.76 3.562 761.90 32381 439.87 Pass - Major Risk 11.404.36 8.571.69 14,30000 8,62906 3954 5802 3215 1,709.28 -3.470.03 3.562 853.58 324.19 53035 Pass - Major Risk 11.490.02 8.571.67 14.275.00 8,828.96 3960 57.96 32.13 1,014.20 -3,471.11 3.562 87533 324.51 55182 Pass - Major Risk 11,500.00 8,571.66 14,20000 0,628.57 39.78 57.73 30.54 1.089.70 -3,479.77 3582 93723 325.00 61307 Pass -Major Risk 11,50000 857166 14.225.00 0,629.71 39.78 67.81 30.63 1664.05 y47558 3.562 917.10 325.26 593.13 Pass - Major Risk 11,50000 8.571.66 14,25000 8.62884 39.78 57.09 30.72 1.83922 -3,47270 3.562 89681 325.50 57273 Pass - Major Risk 11,509.10 8,571.68 14.175.00 8,62841 39.92 57.63 29.40 1.91308 -3,485.24 3.562 956.60 .72562 632.17 Pass - Major Risk 11,51469 857172 14.150.00 8.628.25 4001 67.52 20.68 1,937.16 3,491.97 3562 975.33 325.03 650.75 Pass - Major Risk 11.525.00 0,571.82 14,075.00 8.627.67 40.17 57.14 2723 2,006.80 -3.51960 3.562 1,027.38 325.66 702.91 Pass - Major Risk 11,525.00 0,571.02 14,100.00 8,621.88 40.17 5720 2731 1.904.08 -3,509.10 3562 1,010.70 32803 6Ba00 Pass. Major Risk 1152500 8,57182 1412500 8628.07 40.17 5740 2739 1,%0.84 -3499.96 3582 993.40 328.38 66858 Pass - Major Risk 11,53074 8.51203 14,05000 0.62746 40.39 5699 25.57 2,020.95 -3,531.19 3,502 1,043.14 32629 71041 Pass - Major Risk 1155000 8.57226 14,000.00 0.627.01 40.57 56.67 24.12 2.0726 -3,55778 3.662 1,072.40 326.16 74807 Pass - Major Risk 11.55000 8.57226 14,025.00 8.627.24 40.57 58.83 24.20 205045 -3.54393 3.562 1,05824 326.58 73340 Pas - Major Risk 11,55820 8.57247 13,975.00 8,828.77 4010 $549 23.10 2.09132 -3.57269 3.562 1.085.94 328.14 76158 Pas. - Major Risk 11,56490 8,572.66 Masa00 8626.53 4080 56.30 2226 2.110.57 -3.58864 3.562 1,098.58 32599 774.56 Paas - Major Risk 11,850.00 0,585.14 13,92500 8,826.27 4525 58.11 35.54 2,128,96 -3.605,57 3.562 1,105.01 334.21 774.13 Pass - Major Risk 11,059.99 8,505.43 1390000 8,62601 45.41 55.91 3432 2,146.44 3,823.44 3582 1,110.03 335.36 778.58 Pass - Major Risk 11,875.00 8505.01 13.825.00 0,62520 4565 55.28 3243 2,192.93 3682.10 3552 1.119.74 336.05 78706 Pan - Major Risk 11.075.00 8,505.01 13.850.00 0,625.40 4565 5549 3248 2,17847 3,661.00 3552 1.117.36 336.59 704.97 Pass - Major Risk 11,875.00 8,505.81 13.81500 8,62575 4565 55.71 32.53 2,162.96 $542.20 3.582 1,11423 337.13 70226 Pass - Major Risk 11,889.83 0.506.12 13,800.00 0.62492 45.00 55.05 30.67 2206.31 -3,703.29 3.562 1121,04 337.53 707.97 Pass - Major Risk 11900.00 8.58629 13.750.W 9.62436 saw 54,60 29.41 222957 -374747 3.582 1,121.09 337.68 70773 Pass - Major Risk 11.9000 8.58629 13,775.0 9,624.64 4604 5483 2944 2.21857 -3.725.08 3.562 1, 121 52 330.23 788.15 Pass - Major Risk 11.91231 858646 13,72500 8,624.08 4824 54.37 27.94 223958 -3.770.42 3.562 1,11989 33540 188.11 Pa... Major Risk 11,925.00 8,58658 13,61500 8.623.51 4645 53.92 26.40 2.258.87 -3,916.53 3.562 1,117.55 33861 78403 Pass - Major Risk 11,92500 8,586.58 13700.00 8,623.79 46.45 54.15 2642 2,240.72 -3,19369 3562 1,117.91 339.14 784.14 Pass - Major Risk 11,934.81 0,586.64 13,650.00 0,62322 46.61 53.71 2522 2,270.21 -3,838.81 3,552 1.11891 338.90 785.37 Pass - Major Risk 11,950.00 8585.68 13.575.00 0,622.30 46.05 53.10 2334 2,310.97 4,90156 3.562 1,133.14 338.48 800.42 Pass - Major Risk 11,95000 8,505.60 13.60,00 0,622.63 46.05 5330 2337 229829 -3,08143 3.562 1,126.70 338.93 793.42 Pass Major Risk 11.9%00 8506.68 13,625.0 8,82293 46.85 5350 2339 2,28269 -3.06046 3.562 1,1220 33941 708.32 Pass -Major Risk 11,963.85 6,58668 1355000 0,621.94 4708 52.92 2167 2,32668 -3,921.10 3.582 1,14105 330]4 WI23 Pa... Major Risk 11.975.0 8,58880 13,50000 0,621.11 4736 52.58 20.20 2,36106 -3,95737 3.562 1,151,65 330.34 02952 Pass - Major Risk 11,9750 8.586.60 13.525.00 8,621.64 47.26 5275 20.31 2,343.39 3.93969 3.562 1.150.62 330.73 017.83 Paas -Major Risk 11,986.00 0580.50 13,475.00 8,620.65 4744 $243 1893 2,379.62 -3.974.11 3.562 1.174.15 33824 842.05 Pan - Major Risk CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1:02:42PM Page 25 COMPASS 5000.1 Build 81B i r till) by BP Travelling Cylinder Report N� Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay ND Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore R -28A Database: Reference Design: R -28A WP08 Offset ND Reference: ri.2 BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB R Pad - R-39 - R-39AL7 - R-39AL1 client She Error. 0.00 Pah Survey Program: U&MVr9, 9561-14WD, IM01IMWL3 Rule Assignee: Major Risk Olbat Well Enron 0 D waft RefareMa oesat Semi MajorAai. Measured Vertical Measured Vertical Reference West Tooiface* Oe.et Millions Came casing- centre to No Do Allowable Warning Depth Depth Depth Depth Asimuth ♦14I6 4El-W Hole Sias cents Disarce Deviation haft) (ass) la.e) ho l (usm (ern) (1) Nae) IasR) lin) tu.R) (am) loan) 9,1046 8,533.00 10,200.00 8,780]5 15.52 20.16 170.00 -95125 .1,712.14 3312 1,183.04 16064 1,022.94 Pass - Major Risk 9,11291 8,540.05 10,225.00 8.767,65 15.54 2041 171.12 -957.37 -1]36.35 3.312 1,186.04 16966 1,02520 Pass - Major Risk 9,12059 8.547.50 10,250.00 8.76629 15.56 20.65 172.23 -964.74 -1,760.20 3312 1,190.71 17047 1,029.16 Pass - Major Risk 9,12842 8.554.27 10,275.00 8,765.23 15.50 28.90 173.33 -972,41 -1,783.96 3.312 1.196.17 171,29 1,03394 Pass - Major Risk 9,136.16 8.560.97 10,300.00 8,763.62 15.61 29.15 174.44 .97848 -1,808.16 3.312 1.200.37 172.12 1.037,40 Pass - Major Risk 9,14442 8568.11 10.32500 0,76235 1563 2940 175.54 -903.02 4,832]0 3.312 1,203.54 172.96 1,040.01 Pass - Major Risk 9.153.19 857570 10.35000 0]6143 15.65 29.66 17663 -985.86 -1.857,52 3.312 1,205.53 93.83 1.041.38 Pass - Major Risk 9,162.17 0,583,46 10.375.00 0.76046 15.68 29.91 177,71 -98671 -1,00248 3.312 1,20597 9471 1,041,23 Pas. - Major Risk 9.171.15 0,591.21 10,400.00 0.759.19 15.70 30.16 178.90 -99549 .1,90741 3.312 1,20476 175.59 1.03943 Pass - Major Risk 9,180.20 6589.00 10,42500 0.757.02 15,73 30.40 179.88 -982.39 -1.932.17 3.312 1,20209 176.47 1,036.21 Pass - Major Risk 9,18933 0.606.91 10.45000 8,756.43 15.75 3064 99.04 -977.60 -1,95662 3312 1,197.97 17]35 1,031.56 Pass - Major Risk 9,200.00 8,616.12 10.475.00 8,755.02 15]0 30.07 -177.98 -97055 .1,98062 3,312 1,19240 17822 1,02543 Pa.s- Major Risk 9,20984 8,623.57 10500.05 6754.01 15.79 31.10 -17595 -96212 @004.18 3.312 1,10567 17904 1.018.30 Pass - Major Risk 9,210.90 8,632.42 10.525.00 0.753.16 15,79 31.31 -175.93 -95226 -2.027.00 3.312 1,177.07 17984 1,010.09 Pass - Major Risk 9,228.90 8.641.04 10.550.00 875202 15.79 31.52 -174.92 -940.88 -2,049.31 3312 1,160.05 180,61 1000.68 Pas. - Major Risk 9.238.90 8.649.65 10,575.00 8]51.08 15.80 31.71 -173.93 -927.99 -2,070.70 3.312 1,15861 181.36 900.00 Pass - Major Risk 9.240.57 9,657.99 10,600.00 8.749.97 1580 3189 -17296 -913.56 -2,09107 3.312 1147.04 18208 006.10 Pas. - Major Risk 9,250.00 0,65922 10,625.00 074876 15.80 32.06 -172.03 897.59 .2,11026 3.312 1.134.13 102.79 865.17 Pans -Major Risk 9.25920 8,667.12 10.650.00 0747.39 1581 32.21 471.00 -880.33 -2,12030 3.312 1.120.00 183.11 950.91 Pass -Major Risk 9.264.18 8,67137 10,675.0 0]46.16 15.01 32.35 -17006 -861.93 -2,145.17 3.312 1,105.04 183.54 93566 Pass Major Risk 9.270.00 8.67631 10]00.00 0.745.32 15.01 32.40 -169.12 -842.119 -2,161.34 3.312 1,09957 183.93 920.01 Pass - Major Risk 9.270.00 0,676.31 1072500 8]44.50 15.01 3262 -168.21 -824.31 -2,178.05 3312 1,075.01 184.58 905.54 Pass - Major Risk 9,27441 8,600.01 10,750.00 8,743.90 15.01 32.78 167,03 -806.62 -2.19670 3312 1,061,00 18405 09206 Paas - Major Risk 9,280.00 0,60463 10,775,00 0.74340 15.02 32.95 16575 -789.89 2.21427 3,312 1.05037 18430 880.80 Pass - Major Risk 9.28000 860463 10,000.00 8.742.72 15.02 33.14 -16471 774.36 2,233.84 3.312 1.040.68 195.11 071.27 Pass - Major Risk 9.280.00 8684.63 10.025.00 8.741.73 15.82 33.34 -163.62 76001 $25420 3912 1,032.87 185.97 06387 Pass - Major Risk 9,286.17 s6m.62 10.050.00 8,740.55 15.82 33.56 -162.19 746.70 -227546 3.312 102081 185.71 85]63 Pass - Major Risk 9,290.00 6692.65 10,075.00 8,739.19 1582 3380 -16096 -734.83 -2,297.37 3.312 1.022.76 105.09 053.72 Pass - Major Risk 9,29000 869265 10,90000 673794 1562 3404 -15873 423.92 -2,31983 3.312 1.02044 186.86 851,76 Pass - Major Risk 9.300.011 8,700.32 10.92500 0]36.67 15.83 3430 -15008 -714.12 -2,342.79 3.312 1,019.86 185.74 851.13 Pass - Major Risk 9.30000 0,700.32 10.950.00 0,73537 15.83 3457 -156.98 -705.69 -2,366.20 3.312 1,021.31 186.76 953.02 Pass - Major Risk 9.305.23 0,704.19 10,975.00 0]34.03 15.84 34.05 15563 -690.62 -2.390.22 3.312 1,024.72 18681 855.66 Pass - Major Risk 9.310.00 0,70782 11.000.00 8732.72 15.04 35.14 454.33 -69274 -241048 3312 1,029.07 18654 862.09 Pass - Major Risk 9,314.10 0,710.55 1102500 8,731.82 16.85 3543 153.12 -68]96 -2.439.00 3.312 1.036.65 18658 569.19 Pass - Major Risk 9,32000 0714.52 11,050.00 0,730.58 15.05 3573 .151.06 80443 -2.463.72 3312 1.045.00 186.17 077.87 Pass - Mayr Risk 9,32383 0.717.05 11,07500 8.72949 15.06 36.04 -15070 801.93 -2.488.57 3.312 1.054.93 186.24 808.09 Pass - Major Risk 9,330.00 8.721.00 11.10000 0]27.94 15.07 3635 -149.59 879.96 -2,51344 3.312 1.035.66 105.66 099.05 Pass - Major Risk 9,334.15 8,723.58 11,12500 8,726.57 1587 3666 -14856 877.00 -2153632 3.312 1.076.69 106.50 91045 Pass - Major Risk 9,340.00 8727.03 11,15000 8725.89 1580 3697 -14149 874.81 -2,563.11 3.312 1.08123 105.03 921.27 Pass - Major Risk 9,346.10 8.730.47 11,17500 872511 1589 3127 -14642 86970 -2,507.58 3.312 1.09632 184.30 930.64 Pa. - Major Risk 9,350.00 8,732.50 11,200.00 0,724.18 1590 37.50 -145.50 -663.02 -2.611.63 3.312 1.104.13 184.34 938.91 Pass -Major Risk 9,360.00 8737.64 11.225.00 0.72292 15.91 37.87 -144.23 -654.50 -2,635.09 3.312 1,110.55 18249 945.38 Pass -Major Risk 9.370.00 0,742.19 11.250.00 0,72188 15.93 30.16 -142.99 -644.01 -2,657.75 3312 1,115.31 18074 950.19 Pass - Major Risk 9375.16 0,744.33 11.275.00 0,721.00 15.94 30.43 -142.09 -63180 -2,679.54 3312 1,118.54 19086 953.83 Pan - Major Risk 938349 074148 11.300.00 8]19.83 ism 3069 -141.02 610.16 -2,700.45 3.312 1,120.51 179.84 955.99 Pass - Major Risk 9.390.00 674969 11.32500 8.718.31 1597 38.93 440.09 603,02 -2,72028 3.312 1,121.02 17943 956.83 Pass - Major Risk 10,040.66 8,59303 11,350.00 9,716.04 1964 39.16 -177.41 -586.44 -2,73893 3.312 1,11178 217.58 908.25 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2162017 1:02:42PM Page 26 COMPASS 5000.1 Build BIB I ( BP byTravelling Cylinder Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: R-28 Survey Calculation Method; Well Error. 0.00 usft Output errors are at Reference Wellbore R -28A Database: Reference Design: R -28A WPOB Offset TVD Reference: rel .I BAKER IUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCPt Offset Datum Offset Design PB R Pad - R-39 - R-39AL1 - R-39ALl onset sea Error: o.DO asn Survey Program: 145-MV.D, 9561 -MWD. 10200 -MWD Rule Realism &Major Risk career Wall Eason O.W usft Warier. Weak Semi Major Axis Measured Vertical Measiml VeNal Rabrence West Toofface+ Dnset Wellbore C.M. Casing- Caren to No Do Allowable Warning Depth Depth Depth Depth Aalmuth +11/4 +FJ -W thole size Centre Man.. DeAb. (usft) (muQ (matt) loan) loan) (mas) (% (san) (sand (In) (ain) (sift) (asn) 10.05000 8.593.00 11,375.00 8,715.25 1993 39.30 -176.71 -568.55 -276631 3,312 1,09085 210.56 890.45 Pass - Major Risk 10,050.00 8593.00 11,400.00 871377 1993. 39.57 -176.73 -549.41 -2,772.32 3,312 1,08015 219,41 874.00 Pass - Major Risk 10,060.99 8,593.00 11,425.00 0,711.96 20.05 39.75 -17542 .529.25 -2,706.90 3.312 1.06351 219.95 85587 Pass - Major Risk 1006843 9.593.00 11450.00 &709.53 20.11 39.91 -17475 -508.38 -2,000.51 3.312 1.045.54 220.57 837.32 Pass - Major Rest 10,07500 8.593.00 11,47500 8707.83 20.20 40.07 -173.73 487.10 .2,513.53 3312 1,02737 221.07 818.41 Pass - Major Risk 10075.00 8,593.00 11500.00 8707.13 2020 4025 -17380 46631 -2,827.40 3.312 1.01015 221.87 800.99 Pass - Major Risk 10,083.89 8,593.00 11,52500 0,707.50 2029 4044 -172.86 -446,33 -2.842.40 3.312 994.32 222A4 784.44 Pass - Major Risk 10.09064 8,593,00 1155000 8,70849 20.37 4065 -172.20 .427,62 -2,850.94 3.312 900.43 223.12 769.99 Paas - Major Risk 10,100.00 8,593.00 11.57500 8.70963 20.47 40.89 -171,23 -41021 -2.07585 3.312 %8.48 22376 757.30 Pass - Major Risk 10,100.00 8593.00 11,600.00 0,710.70 2047 41.15 .171.37 -394.05 -2.895.07 3.312 95840 22483 747.12 Pass - Major Risk 10,113.31 8,593.00 11625.00 8,712.00 20.61 41.43 -169.91 .37940 -2,916.09 3.312 950.40 22536 738.13 Pass - Major Risk 10.12500 8,593.00 1165000 0,712.70 20.74 4172 -16860 -36506 -2,937.09 3.312 944.07 22585 730.98 Pass - Major Risk 10,125.00 8,593.00 11,67500 8,712.91 2074 4202 -168.65 45321 .2.95865 3312 939.10 227.05 726.01 Pass - Major Risk 10,138.10 8,593.00 11700.00 8,712.21 2089 42.33 -167.07 -341.25 -2.980.58 3.312 935.16 22147 721.10 Pass - Major Risk 10,150.00 3,59300 1172500 8710.50 2102 4265 -165.56 -329.93 -3.002.82 3.312 932.30 227,87 717.36 Pass - Major Risk 10.150.00 8,593.00 1175000 8700.59 21.02 4297 -16545 -31935 -3025.38 3.312 930.62 229.09 715.83 Pas. - Major Risk 10,163.52 8,593.00 11.77500 8707.42 21.17 43.30 -16375 -30870 -3,040.40 3.312 930.46 229.29 714,72 Pa.s- Major Risk, OD, ES, SF 10,175.00 0.593.00 11,800.00 87011.55 2130 43.64 -16281 -30132 4.07181 3312 932.10 229.54 715.61 Pass - Major Risk 10.175.00 8,593.00 11.825.00 8705.05 21.30 4398 -162.20 -293.48 -3.09563 3,312 934.08 23077 71873 Pass - Major Risk 10,188.77 8,593.00 11,850.00 8,703.22 2145 4433 -160.40 .200.63 -3.11980 3.312 930.85 23069 72178 Pass - Major Risk 10.200.00 8,593.00 1187500 8701.42 21.50 44.68 -158.91 -20079 -3,143.84 3.312 944.34 230.73 72880 Pass - Major Risk 10.200.00 0,593.00 11.90000 8.89990 21.50 45.03 -158.77 Q75B3 -3,16839 3.312 951.17 231,92 73385 Pass - Major Risk 10.212.94 0.593.00 11.925.00 8698.87 21.73 45.39 -157.10 -27151 -3,19289 3312 959.02 23163 74102 Pass - Major Risk 10,225D0 8,59300 11.950.00 8,698.77 21.86 46.74 -15559 26798 3.211.64 3,312 968.17 231.30 749.50 Pass - Major Risk 10.225.00 8,59300 11.975.00 8,699.23 21.06 46.10 -15555 -265.30 3,242.49 3.312 978.51 232.43 760.53 Pass - Major Risk 10.235.45 0,59300 12.00000 869948 21.90 sees -154.23 -26367 3 267A 3,312 990.09 232.14 771.66 Pass - Major Risk 10,625.00 0,592.97 12.025.00 8,699.53 26.92 46.02 -174.65 -263.31 -329243 3.312 995.77 263.05 744.84 Pass - Major Risk 10,62500 8,592.97 12,050.00 8698.54 28.92 47.00 -174.57 -26377 4,317,40 3312 1001.15 26279 74973 Pass - Major Risk 10,636.95 8592.96 12,072.00 8697.53 27.08 47.24 -17305 -264.27 -3.33937 3,312 1,006 22 251.05 75390 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1:02:42PM Page 27 COMPASS 5000.1 Build 816 by PB R Pad- R-39-R-39ALl BP Travelling Cylinder Report PB1 Company: North America -ALASKA -BP Local Co-ordinate Reference: Project: Prudhoe Bay ND Reference: Reference Site: PB R Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: R-28 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore R -26A Database: Reference Design: R -28A WPO8 Offset ND Reference: //.FA\ BAKER HUGHES Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCPi Offset Datum Offset Design PB R Pad- R-39-R-39ALl PB1-R-39ALl PB1 Most she Enter: DOD unit Survey Program: 145 MM. 9561 -MWD Rule Assigned: Major Risk grant Wall Error: ow.eft Reference Of o ii Major Asia Measured Vertical Measured Vertical Reference Cruise Toollik. Onset Wellbore centre Casing- Centrale No Do Allowable Warning Depth Depth Depth Depth Azimuth logy aH-W Hole site Care. Distance tasked. Joan) lash) (user (oan) lewo loan) P) leak) teen) (In) (..it) lush) loan) 9.104.90 8,533.91 10,20000 8.760.89 1552 28.10 169.99 -95108 4,712.18 5.937 1,182.90 169.10 1.022.55 Pass - Major Risk 9,113.72 0.541.55 10,225.00 0]68.24 15.54 28.0 171.11 -955.14 -1,73683 5.937 1,183.92 170.00 1,02275 Pass - Major Risk 9.122.04 8.549.45 10,250.00 8,767.59 15.57 28.70 172.21 -957,07 -1,761.74 5.937 1,183.30 17093 1.02133 Pass - Major Risk 9,13247 0.557]0 10,275.00 8,78733 15.59 20.96 173.30 -95691 -1,706.73 5.937 11181.13 171.05 1,010.38 Pass - Major Risk 9.14233 8.566.31 10,30000 8,761.16 1562 29.21 174.37 -95460 1101162 5937 1,177,28 172.78 1,013,78 Pass - Major Risk 9,152.50 8.57517 10.32500 8.767.38 15.65 29.46 175.42 -960,44 5.937 1,172.11 173.71 1.007a0 Pass - Manor Risk 9,16305 8,58422 10,35000 0]67.87 15.60 29.70 176,45 -94467 -1.860.58 5.937 1,165.79 174.62 1,000.06 Pass - Major Risk 9,17352 8,59326 10.375.00 0]60.31 15.71 2993 17747 -937.35 -1.08440 5.937 1,150.33 17552 992.72 Pass - Major Risk 9.1830 8.601.85 10.400.00 0]80.04 1574 30.16 17949 -928.41 -1,907.81 5.937 1,14952 17640 983.26 Pass - Major Risk 9,193.13 0,610.19 10.425.00 6.767,44 1517 30.37 179.50 -91794 -1,930.50 5.937 1,139.51 177.26 972.93 Pass - Major Risk 9.20326 8,618.93 10.450.00 8767.11 15.79 30.59 -179,49 -90148 -1.953.21 4.675 1,12991 178.02 982.54 Pass - Major Risk 9,213.09 8.620.10 10,475.00 8766s7 15.79 30.82 -17043 -090.34 -1.976.46 4.875 1,121.98 176.85 95407 Pass - Major Risk 9.224.40 0.637.16 10,500.00 8,76517 1519 3106 -177.33 -090.83 3,000.29 4815 11116.00 179.71 94764 Pass -Major Risk 9,235.05 8,84534 10,525.00 8,765.13 15.00 31.31 -176.21 -084.07 -2,024.58 4815 1.112.10 18061 943.24 Pass - Major Risk 9,245.82 605562 10.550,00 0,76068 15.00 31.57 -175W -880.50 -2,049.16 4.875 1,110.34 101.51 940.92 Pas. - Major Risk 9,250.00 8,65922 10.57501) 0,763.75 15.80 3184 -17392 -878.01 -2074.02 4.075 1,110.01 102,48 941.10 Paas - Major Risk 9,25577 8,666,75 10,600.00 0,762.70 1581 32.12 -172.68 -877.09 -2,09898 4.075 1,11332 183.12 94322 Pass - Major Risk %264.53 0,671.88 10,625.00 8,16211 15.81 32,40 -17149 -876.21 -2,12395 4.875 1,116.40 183.89 946.04 Pass - Major Risk 9170.00 0,678.31 10,850.00 8,76120 1581 3269 -17081 -87459 -2,148.88 3.562 1.11921 184.57 940]2 Pass - Major Risk 9,270.00 0.676.31 10.675.00 8,759.67 15.81 32.90 -169.19 -871.77 -2,173.57 3.562 1,12131 185.59 950.77 Peas - Major Risk 9,274.75 8.600.30 10.700.00 8,757.66 15.01 33.27 -16783 -867,40 -2.198.20 3,562 1.122.30 185.78 95160 Paas - Major Risk 9.20000 8.684.63 10.725.00 8.755.60 15.02 3355 46544 -881.16 -2.222.31 3.562 1,121.94 185.80 95110 Pass - Major Risk 9,28000 8.684.63 1D75000 8,753,79 15.82 3382 46535 853.20 -2.245.94 3.562 1.120.31 18882 949.54 Pass - Major Risk 9,290.00 8.88463 10,77500 0]52.30 15.02 34.08 -1642}Y'� -04360 226897 3 .562 1.117.52 10783 946N Pass Major Risk 9,28560 8,689.16 10,800.00 0,751.02 15.02 34.32 -16293 .- -83220 -2,291.17 3.562 1.113.25 107.67 942.54 Pass - Major Risk 9,290.00 8.692.65 10025.00 8.749.86 1562 3455 -16180 -818.95 -2,31233 3.562 1,107.44 187.89 93676 Pass - Major Risk 9,29000 8,692.65 10.850.00 9,740,79 1582 34.70 -16D.67 -804.61 2332.78 3.582 11100.85 180.63 93041 Pass - Major Risk 9.295.43 saints 10.875.00 8.747,37 15.83 35.01 -159.37 -791.03 -2,353.72 3.582 109562 180.40 92522 Pass - Major Risk 9.300.00 0700.32 1.900.00 8.745.89 15.83 3526 -158.09 -778.84 -2,375.49 3.562 1,092.48 180.35 922.21 Pass - Major Risk 9,300.00 8.700.32 10,925.00 8.744.54 15.83 35.52 -157D7 -76797 -2.397% 3,562 1,091.37 18940 92147 Pass- Major Risk. CC, ES. SF 93100D 8.707.62 10.950.00 8,74322 15.04 35.80 -155.53 -758.40 -2.421.01 3562 1,092.19 18560 92221 Pass - Major Risk 9,31000 8.707.62 10,975.00 0,741.70 15.04 3500 -154.54 40.12 -2.444.55 3.562 1.094.88 109.15 925.31 Pass Major Risk 931563 0711.56 11,000.00 0,739,71 1585 38.37 -15326 -742.90 -2,460A2 3.582 1.099.20 10082 929.82 Pass - Major Risk 9,320.00 8,714.52 11,025.00 0736.89 1585 3867 -15205 -737.07 -2,49252 3582 1,105.19 108.77 936.05 Pass - Major Risk 9.324.39 8717.42 11,050.00 0.73346 1586 3698 -10.88 .732.50 -2,516e8 seer 111293 108.71 90.05 Peas - Major Risk 9,33000 8,72100 11,07500 8,730.09 1587 37.29 -149.72 -72932 -2,54154 3.562 112248 188.28 953.00 Pass - Major Risk 9,334.18 0.723.58 11,10000 8720.00 15.87 37.61 -149.69 -02533 -256020 . 3.562 1.132.62 108.21 96423 Pass - Major Risk 9,360.00 0.727.03 11,125.00 872704 1$88 37.93 447.60 -721.94 -2,590.01 3582 1,141.06 18781 97370 Pass - Major Risk 9.345.61 8,730.20 11,150.00 6,72585 15.89 3025 446.56 -715.89 -2,61504 3,562 1.149.92 187.17 982.02 Pass - Msjor Risk 9.350.00 8.732.58 11.175.00 8,724.97 15.90 30.56 -14563 408.30 -2.830.84 3.562 1.10.86 18700 989.33 Pass - Major Risk 9,360.00 8,73764 11.200.00 8.724.23 15.91 30.07 -14441 -898.02 -26620 3.562 1.162.44 105.12 994.90 Pass - Major Risk 9,366.23 8.740.54 11125.00 0.72359 15.93 39.14 -14344 -88783 -2,684.37 3.562 1,166.36 18433 999.07 Pass - Major Risk 9.37398 8,743.85 11,25000 0,723.05 1594 3941 -142,41 -67467 $705.61 3.562 1,168A2 103.41 1,001.31 Pass - Major Risk 9,38000 8,74621 11,275.00 %72.110 15.95 3964 -141.53 -65981 -2,72570 3.562 1,16881 18309 1,002.24 Paz. - Major Risk 8,390.00 8,749.69 11 Union 8.722.17 15,97 3978 -140.43 54464 -2,745.57 3.562 1,169.18 181.51 1,003.13 Pass - Major Risk 10.04577 0,593.00 11,30900 8,72202 19.89 39.84 -177.17 539.19 -2.752.72 3.562 1,16627 225.71 958192 Pass - Major Risk CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 21612017 1:02:42PM Page 28 COMPASS 5000.1 Build 81B J"k fig bBP I p Travelling Cylinder Report BAKERER HUGHES Company: Project: Reference Site: Site Error: Reference Well: Well Error: Reference Wellbore Reference Design: North America - ALASKA - BP Prudhoe Bay PB R Pad 0.00 usff R-28 0.00 usff R -28A R -28A WP08 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method; Output errors are at Database: Offset TVD Reference: Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usff (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to ORIG KELLY BUSHING @ 51.20usft Coordinates are relative to: R-28 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NA027 ° OGP-Usa AK / Central Meridian is 150° 0'0,000 W Grid Convergence at Surface is: 1.03 ° CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1:02:42PM Page 29 COMPASS 5000.1 Build 81B Ladder Plot 1400 i i I i C 1050 O I ) 700— 00 C) U L.!.. 0 I I I U I I I I I 350 -_-- ---_- ---- I 0 0 2000 4000 6000 5000 10000 12000 Measured Depth LEGEND $ R -14,R -14,R -14V5 $ R -28,R -28,R -28V1 $ R -01,R -01,R -01V1 # R-14,R-14A,R-14AV3 -XF R-02,R-02A,R-02WP1OV0 $ RJ0,R-30A,R-30AVVP10V0 -� R-15,R-15A,R-15AVO -&- R -02,R -02,R -02V1 -} R39,R-39AL1,R-39AL1VO $ R-17,R-17B,Plan#15R-17Bapproved VO -+- R-29,R-29A,R-29AV1 $ R-39,R-39AL1PBI,R-39AL1PB1V0 $ R-17,R-17B,R-17BVO $ R -29,R -29,R -29V1 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 2/6/2017 1:02:42PM Page 29 COMPASS 5000.1 Build 81B BP FPS F1 2 by Travelling Cylinder Report BAKER �I HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB R Pad Site Error: 0.00 usft Reference Well: R-28 Well Error. 0.00 usft Reference Wellbore R -28A Reference Design: R -28A WP08 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to ORIG KELLY BUSHING @ 51.20usft Coordinates are relative to: R-28 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK / Central Meridian is 150' W0.000 W Grid Convergence at Surface is: 1.03 ° 9 `o �s 3 0. Separation Factor DIM Go - I i -)f- R-14,R-14A,R-14AV3 I � i i R-15, R -15A, R -15A VO ____�----- ___- ____I__ _ _�______ i 1 i 00 $ R39,R39AL1PB1,R39A1_1PB1V0 I i i (_. $ R-29, R-29, R-29 V1 i 00 0 2500 5000 7500 10000 12500 LEGEND $ R -14,R -14,R -14V5 $ R -28,R -28,R -28V1 $ R -01,R -01,R -01V1 -)f- R-14,R-14A,R-14AV3 -K- R-02,R-02A,R-02AVbP10V0 $ R-30,R-30A,R-30AWP10VO i R-15, R -15A, R -15A VO -a}- R-02, R-02, R-02 V 1 -} R39, R-39AL1, R39AL1 VO $ R -17,R -17B, Plan#15 R-17Bapproved VO —t— R-29,R-29A,R-29AV1 $ R39,R39AL1PB1,R39A1_1PB1V0 $ R-17, R-178, R -17B VO $ R-29, R-29, R-29 V1 CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 2/62017 1:02:42PM Page 30 COMPASS 5000.1 Build BIB !k1l BP FORM bp +i+"r Travelling Cylinder Report BAKER HUGHES Company: North America -ALASKA -aP Project: Prudhoe Bay Reference Site: PB R Pad Site Error: 0.00 usft Reference Well: R-28 Well Error. 0.00 usft Reference Wellbore R -28A Reference Design: R -28A WP08 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well R-28 Mean Sea Level ORIG KELLY BUSHING @ 51.20usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to ORIG KELLY BUSHING @ 51.20usft Coordinates are relative to: R-28 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK / Central Meridian is 150° 0' 0.000 W Grid Convergence at Surface is: 1.03' Travellinq Cylinder 330 / I \ 30 300/ / X / 19uu �_ - '-, \ \ 60 2707240;4 '11647"a'u 10743 9117/\ 120 9105 210 \ I / 150 180 Azimuth from North['] vs Centre to Centre Separation [800 usfVin] LEGEND $ R -14,13 -14,R -14V5 $ R -28,R -28,R -28V1 $ R -01,R -01,R -01V1 -X- R-14,R-14A,R-14AV3 -E- R-02,R-02A,R-02A1NP10V0 $ R-30,R-30A,R-30AWP10V0 —i— R-15,R-15A,R-15AV0 -&- R -02,R -02,R -02V1 -a- R-39,R-39AL1,R-39AL1V0 $ R-17,R-17B,PIan#15R-17Bapproved V0 $- R-29,R-29A,R-29AV1 $ R-39,R-39AL1PB1,R-39AL1PB1V0 $ R-17, R -17B, R -17B V0 $ R-29, R-29, R-29 V1 CC -Min centre to center distance or covergenl point, SF -min separation factor, ES - min ellipse separation 2162017 1:02:42PM Page 31 COMPASS 5000.1 Build 81B TRANSMITTAL LETTER CHECKLIST WELL NAME: �� �—C7 /L PTD: Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: K1,142L POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50 - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing rogram. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 _ Well Name: PRLJ_QHOB BAY UNIT R -28A _Program DEV _ Well bore seg ❑ PTD#:2170190 Company BP EXPLORATION (ALASK"MC. Initial Class/Type DEV / PEND GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal ❑ 3 4 5 6 7 8 9 10 Appr Date 11 SFD 2/21/2017 12 13 14 15 16 18 Engineering 19 Appr Date MJQ 3/22/2017 30 31 Geology 36 Appr Date 37 SFD 2/21/2017 38 Nonconven. gas conforms to AS31,05.0300. 1.A),0 2.A -D) _____ _ _ _ _ _ _ _ _ _ _ NA Permit fee attached - - - - - - - - - .... - - - - - - - ... NA. Lease number appropriate _ _ .. _ _ Yes Entire Well lies within ADL0028279...... Unique well name and number _ _ _ .. - - - ...... Yes Well located in. a. defined pool _ _ _ .... _ _ _ _ _ _ _ _ _ Yes PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341 F Well located proper distance from drilling unit boundary.. _ _ _ _ _ ....... _ . Yes CO 341 F, Rule 2:. There shall be no restrictions. as to well spacing. except that no pay shall be Well located proper distance from other wells _ _ _ Yes _ opened in a well closer than 500 feet to the boundary of the affected. area. Planned well conforms to CO _ Sufficient acreage. available in. drilling unit. _ _ .. _ _ _ ... Yes 341 F,. Rule 2. If.deviated, is wellbore plat included _ _ _ _ _______ _ _ _ _ _ _ _ _ Yes Operator only affected park' _ _ _ _ _ .. Yes Operator has. appropriate bond in force . . . . . . ....... . . _ _ _ _ _ Yes Permit can be issued without conservation order.. _ _ _ _ _ Yes Permit can be issued without administrative. approval _ _ .... _ _ _ _ _ Yes Can permit be approved before 15 -day wait _ _ _ _ ....... Yes Well located within area and. strata authorized by Injection Order # (put 10# in. comments) (For. _NA All welts. within 1/4. mile area. of review identified (For service well only). _ _ _ . Pre -produced injector: duration of preproduction less than 3 months (For service Well only) .. NA Conductor string. provided _ _ _ _ _ ... _ _ _ _ ___________ _ _ _ _ _ _ _ _ _ _ _ NA Set in original well R-28.. _ Surface casing protects all known USDWs _ _ _ _ _ _ _ _ _ _ _ _ _ _ ... NA Set in original well R-28 _ CMT vol adequate to cireulate.on conductor & surf.csg _ _ _ ................. NA _ Set in original well R-28 CMT vol adequate to lie -in long string to surf csg_ ....... _ _ _ _ _ _ . NA _ Set in original well R-28 CMT will cover all known_producfive horizons. .. _ _ - _ - _ _ Yes Sidetrack will cement liner in place ... Casing designs adequate for C, T, B &. permafrost_ ... _ _ _ _ .......... Yes Adequate tankage. or reserve pit _ _ _ _ _ _ _ _ _ _ ______ Yes Rig has steel pits_ If.a re -drill, has.a 10-403 for abandonment been approved _ _ _ _ _ _ _ _ _ _ _ Yes Sundry _317-076___ Adequatewellbore separation _proposed _ _ ... _ _ _ ....... Yes _ Proximity analysis performed ................. . . . . . . _ _ _ If,diverter required, does it meet regulations .. _ _ _ _ _ _ _ _ _ _ .. NA Wellhead in place, BOPE to be installed Drilling fluid program schematic & equip list adequate _ _ _ ......... _ Yes _ Max formation pressue @_8900' TVD is 3350 psi (7.2 ppg EMW), 8.4 ppg MW.planned. BOPEs,. do they meet regulation _ _ _ ... . . . . . . . ......... Yes _ _ _ _ ROPE press rating appropriate: test to (put psig in comments).. _ _ _ _ Yes .. 3800 psi BOP test pressure, MASP is 2461 psi Choke manifold complies w/API RP -53 (May 84) _ _ _ _ _ _ _ _ ____ _ _ _ _ _ _ Yes Work will occur without operation shutdown_ _ _ _ _ _ _ _ _ _ Yes ..... Coil tubing sidetrack in zone _ _ Is presence of H2S gas probable _ ....... . . . . . . _ _ _ _ _ _ _ Yes _ _ _ _ _ H2S measures required.. _ ..... Mechanical condition pf wells within AOR verified (For service well only) ..... NA Permit can be issued w/o hydrogen, sulfide measures. _ _ _ _ _ _ _ ...No....... _ R -Pad wells are H2S-bearing. H2$ measures.are required.. _ Data.presented on potential overpressure zones_ _ _ _ _ _ _ ____ _ _ _ _ _ _ _ _ Yes .. Planned drilling mud program (about 8.4 ppg) appears adequaleto control operator's forecast _ Seismic analysis of shallow gas zones . . . . ... . . . . . . .......... _ NA..... _ _ pore pressure_ gradient (about 7.24 ppg) Should higher pore pressures be encountered, Seabed condition survey.(if off -shore) _ ______ _ _ _ _ _ _ _ _ _ _____ _ _ _ _ _ _ _ _ NA _ _ BP has. immediate access to nearby, Fluid mixing facilities. Contact name/phone for weekly.progress reports. [exploratory only] . _ .... .. NA... Geologic Date Zate� I I > Engineering Date Public Date Commissioner: Commie51one/ C�7+,d 3f7 z `