HomeMy WebLinkAbout217-0737. If perforating:
1. Type of Request:
2. Operator Name:
3. Address:
4. Current Well Class:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Property Designation (Lease Number):10. Field:
Abandon
Suspend
Plug for Redrill Perforate New Pool
Perforate
Plug Perforations
Re-enter Susp Well
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well
Other:
Change Approved Program
Operations shutdown
What Regulation or Conservation Order governs well spacing in this pool?
Will perfs require a spacing exception due to property boundaries?Yes No
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
PRESENT WELL CONDITION SUMMARY
Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft):
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
12. Attachments:
14. Estimated Date for
Commencing Operations:
13. Well Class after proposed work:
15. Well Status after proposed work:
16. Verbal Approval:
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal.
Proposal Summary Wellbore schematic
BOP SketchDetailed Operations Program
OIL
GAS
WINJ
WAG
GINJ
WDSPL
GSTOR
Op Shutdown
Suspended
SPLUG
Abandoned
ServiceDevelopmentStratigraphicExploratory
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
AOGCC USE ONLY
Commission Representative:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Location ClearanceMechanical Integrity TestBOP TestPlug Integrity
Other Conditions of Approval:
Post Initial Injection MIT Req'd?Yes No
Subsequent Form Required:
Approved By:Date:
APPROVED BY
THE AOGCCCOMMISSIONER
PBU B-36A
OA Squeeze
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK
99503
217-073
50-029-22667-01-00
341J
ADL 0028309, 0028310
13702
Conductor
Surface
Intermediate
Liner
Liner
8853
78
3613
10790
936
2804
11465
20"
9-5/8"
7"
4/1/2"
3-1/2" x 3-1/4" x 2-7/8"
8905
36 - 114
36 - 3649
33 - 10823
10614 - 11550
10898 - 13702
2430
36 - 114
36 - 3339
33 - 8606
8452 - 8932
8658 - 8853
None
470
3090
7020 / 5410
7500
10530
11465, 11950,
12800, 13530
1490
5750
8160 / 7240
8430
10160
10976 - 13573 4-1/2" 12.6# 13cr80, L80 31 - 106208704 - 8903
Structural
4-1/2" Baker S3 Packer
4-1/2" Baker S3 Packer
10383, 8282
10564, 8415
Date:
Torin Roschinger
Operations Manager
Oliver Sternicki
oliver.sternicki@hilcorp.com
(907) 564 4891
PRUDHOE BAY
10/15/2024
Current Pools:
PRUDHOE OIL
Proposed Pools:
PRUDHOE OIL
Suspension Expiration Date:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov
No SSSV Installed
By Grace Christianson at 1:55 pm, Sep 30, 2024
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2024.09.30 13:39:08 -
08'00'
Torin
Roschinger
(4662)
324-567
10-404
DSR-10/2/24MGR03OCT24SFD 10/4/2024JLC 10/4/2024
Gregory Wilson Digitally signed by Gregory Wilson
Date: 2024.10.07 13:52:36 -08'00'
10/07/24
RBDMS JSB 100824
OA WellLock Squeeze
Well: B-36
PTD: 217-073
Well Name:B-36A Permit to Drill Number:217-073
Well Type P API Number:50-029-22667-01
Job Scope:OA WellLock Squeeze Reg.Approval Req’d?Yes
Current Status:Under Eval, Online Date Reg. Approval Rec’vd:
Estimated Start Date:10/15/2024 Estimated Duration:2day
Regulatory Contact:Abbie Barker (907)564-4915
First Call Engineer:Oliver Sternicki (907) 564 4891
Second Call Engineer:Michael Hibbert (907)903-5990
Brief Well Summary:
B-36 is a natural flow producer. On 9/23/24 the OA began to rapidly repressurize and exceed MOASP.
The OA of B-36 was cemented to surface on 9/13/08 as part of a RWO to repair a SC leak. Since the OA
was cemented, it has seen periods of OA repressurization. Due to this, the OA was Wellocked on
10/11/2019 and again on 9/19/2021.
Current Status:
B-36 is currently under evaluation starting 09/23/2024.
Scope of Work:
Squeeze OA with Well Lock (or similar) to repair OA repressurization.
Procedure:
1 Valve Shop ND OA GATE VALVE, NU OA INTEGRAL
2 DHD WELL LOCK OA SQUEEZE
3 Special Projects A/DHD WELL LOCK SQUEEZE
4 DHD POP U/E, MONITOR FOR OA REPRESSURIZATION,
5 Valve Shop ND OA INTEGRAL, NU OA GATE VALVE
6 DHD RE-SQUEEZE OA WITH WELL LOCK IF NECESSARY.
OA WellLock Squeeze
Well: B-36
PTD: 217-073
Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: September 30, 2024Subject: Changes to Approved Sundry Procedure for Well B-36ASundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU B-36A
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
217-073
50-029-22667-01-00
13702
Conductor
Surface
Intermediate
Liner
Liner
8853
78
3613
10790
936
2804
11465
20"
9-5/8"
7"
4/1/2"
3-1/2" x 3-1/4" x 2-7/8"
8905
36 - 114
36 - 3649
33 - 10823
10614 - 11550
10898 - 13702
36 - 114
36 - 3339
33 - 8606
8452 - 8932
8658 - 8853
None
470
3090
7020 / 5410
7500
10530
11465, 11950, 12800, 13530
1490
5750
8160 / 7240
8430
10160
10976 - 13573
4-1/2" 12.6# 13cr80, L80 31 - 10620
8704 - 8903
Structural
4-1/2" Baker S3 Packer 10383, 8282
10383, 10564
8282, 8415
Torin Roschinger
Operations Manager
Michael Hibbert
michael.hibbert@hilcorp.com
907-903-5990
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028309, 0028310
31 - 8456
N/A
N/A
138
1431
13394
41462
43
0
600
1250
205
863
N/A
13b. Pools active after work:PRUDHOE OIL
4-1/2" Baker S3 Packer 10564, 8415
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
No SSSV Installed
By Grace Christianson at 1:25 pm, Apr 09, 2024
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662),
ou=Users
Date: 2024.04.09 12:54:05 -08'00'
Torin
Roschinger
(4662)
DSR-4/12/24
RBDMS JSB 041024
WCB 2024-07-09
ACTIVITY DATE SUMMARY
2/26/2024
*** WELL FLOWING ON ARRIVAL ***
RIH W/ 30'X 2.29" DMY GUN DEVIATE OUT @ 11060'SLM, POOH
RIH W/ 20'X 2.29" DMY GUNS, tag @ 10854'SLM, WORK TOOLS FOR 20MINS
WONT FALL THROUGH, POOH.
*CONTINUE ON 2-27-2024*
2/27/2024
*CONTINUED FROM 2-26-2024*
*** WELL FLOWING ON ARRIVAL***
RIH W/ 20' X 2.29 DMY GUNS SIT DOWN @ 11083'SLM, WORK TOOLS TO
11,130'SLM, POOH.
RIH W/ 10' X R-STEM, OJ, LSS, 10' X DMY GUN DRIFT (2.99") DEVIATE OUT @
11,563'SLM POOH
** WELL FLOWING ON DEPARTURE ***
3/30/2024
*** WELL S/I ON ARRIVAL*** OBJECTIVE: SET NS 325-228 EXTRA RANGE CIBP
AND PERFORATE INTERVAL W/2'' GEO RAZOR GUN
6 spf 60 DEG PHASE
MIRU YELLOW JACKET E-LINE.
PT PCE 250 PSI LOW./3500 PSI HIGH
RIH W/CH/1.69'' GUN GAMMA/20' OF 2'' GEO RAZOR GUN, 1.69'' MSST
SETTING TOOL AND NS 325-228 EXTRA RANGE CIBP TO SET PLUG AT 11595'
325-228 EXTRA RANGE CIBP AT 11465' MD CCL TO MID ELEMENT 39' CCL
STOP DEPTH 11426', AND PERFORATE INTERVAL 10976'-10996' MD W/2'' GEO
RAZOR 6spf 60 DEG PHASE TOOL TAG AT 11518'
GR-CCL TO BAKER RPM DATED 05-JULY-2017
RDMO YELLOW JACKET ELINE
***WELL S/I ON DEPARTURE ***
Daily Report of Well Operations
PBU B-36A
CIBP and adperfs are correctly shown on the new WBS, below. -WCB
PERFORATE INTERVAL 10976'-10996' MD
RIH W/CH/1.69'' GUN GAMMA/20' OF 2'' GEO RAZOR GUN, 1.69'' MSST
SETTING TOOL AND NS 325-228 EXTRA RANGE CIBP TO SET PLUG AT 11595'
EXTRA RANGE CIBP AT 11465' MD
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU B-36A
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
217-073
50-029-22667-01-00
13702
Conductor
Surface
Intermediate
Production
Liner
8853
78
3613
10790
936
2804
11950
20"
9-5/8"
7"
4-1/2"
3-1/2" x 3-1/4" x 2-7/8"
9053
36 - 114
36 - 3649
33 - 10823
10614 - 11550
10898 - 13702
36 - 114
36 - 3339
33 - 8606
8452 - 8932
8658 - 8853
None
470
3090
7020 / 5410
7500
10530
11950, 12800, 13530
1490
5750
8160 / 7240
8430
10160
11830 - 13573
4-1/2" 12.6# 13cr80, L-80 31 -10620
9046 - 8903
Structural
4-1/2" Baker S3 Packer 10383, 8282
10383, 10564
8282, 8415
Torin Roschinger
Operations Manager
Michael Hibbert
michael.hibbert@hilcorp.com
907-903-5990
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028309, 0028310
31 - 8456
N/A
N/A
169
303
21946
4822
160
331
1200
1200
874
172
13b. Pools active after work:PRUDHOE OIL
4-1/2" Baker S3 Packer 10564, 8415
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 2:06 pm, Aug 21, 2023
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662),
ou=Users
Date: 2023.08.21 13:46:00 -08'00'
Torin
Roschinger
(4662)
DSR-8/21/23
RBDMS JSB 082423
WCB 3-12-2024
ACTIVITY DATE SUMMARY
8/9/2023
***WELL S/I ON ARRIVAL***(pre-eline)
T-BIRD LOADS/KILLS WELL W/ 180 BBLS CRUDE
DRIFT W/ 24' x 2.26" DMY PERF GUNS (2.26 od), 1.75" SAMPLE BAILER TO
12,100' SLM (see log, pump assistance past 11,855' slm)
***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED***
8/9/2023
T/I/O= 1900/1900/0 Temp=SI (TFS Unit 4 Assist SL with perforating) Pumped
207 BBLS of crude down TBG to assist SL with reaching Target Depth. SL in control
of well upon TFS Departure.
Final WHPS= 468/1467/0
8/13/2023
T/I/O= 530/1351/0 Temp= S/I (TFS Unit 4 Assist E-line with pump down) Pumped
118 BBLS of crude in attempt to get E-line to target depth. Well left in E-line control
upon TFS departure.
Final WHPS=635/1237/0
8/13/2023
***WELL SHUT IN ON ARRIVAL***
Pressure test from 200LP - 3000HP
Run #1 : RIH with 1 7/16" Cable Head, 1 11/16" GR/CCL, 2" Perf Gun, Owens Long
Stroke, Northern Tubing Plug (Max OD = 2.10, Max Lenth = 42')
Correlate to HES Memory CBL dated 21-aug-19
Plug Set Depth= 11,950' , CCL Offset = 38.3' , CCL Stop Depth = 11,911.7'
Shooting Depth = 11,850 - 11,830' , CCL Offset = 8.6' , CCL Stop Depth = 11821.4
(2" 6spf 60phase HSC w/ razor charges)
Run#2 : RIH with 1 7/16" Cable Head, 1 11/16" GR/CCL, 2" Perf Gun (Max OD =
2.10" , Max Lenth= 38')
Make 3 attempts to make it to perforation depth but stall out at 11490', decision made
to push rest of interval to Coil
***WELL SHUT IN ON DEPARTURE***
Daily Report of Well Operations
PBU B-36A
y
Plug Set Depth= 11,950' ,
Shooting Depth = 11,850 - 11,830'
g
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s):
Abandon
Suspend
Plug for Redrill Perforate New Pool
Perforate
Plug Perforations
Re-enter Susp Well
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name:
Authorized Title:
Authorized Signature with date:
Contact Name:
Contact Email:
Contact Phone:
PBU B-36A
OA Squeeze
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
217-073
50-029-22667-01-00
13702
Conductor
Surface
Intermediate
Liner
Liner
8853
78
3613
10790
936
2804
12800
20"
9-5/8"
7"
4-1/2"
3-1/2" x 3-3/16" x 2-7/8"
9040
36 - 114
36 - 3649
33 - 10823
10614 - 11550
10898 - 13702
36 - 114
36 - 3339
33 - 8606
8452 - 8932
8658 - 8853
None
470
3090
7020 / 5410
7500
10530
12800, 13530
1490
5750
8160 / 7240
8430
10160
11980 - 13573
4-1/2" 12.6# L-80 31 - 10620
9048 - 8903
Structural
4-1/2" Baker S3 Packer 10383, 8282
10383, 8282
10564, 8415
Stan Golis
Sr. Area Operations Manager
Oliver Sternicki
Oliver.Sternicki@hilcorp.com
907.564.4891
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV (type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final
13.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028309 & 0028310
4-1/2" Baker S3 Packer
31 - 10620
10564, 8415
OA at Surface.
Pumped 0.5-gallons of WellLock & applied 2500-psi squeeze pressure.
250
205
24471
22250
200
134
300
0
435
855
321-453
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Senior Pet. Engineer: Senior Res. Engineer:
Form 10-404 Revised 3/2020 Submit Within 30 days or Operations
By Meredith Guhl at 2:14 pm, Oct 01, 2021
Digitally signed by Stan Golis
(880)
DN: cn=Stan Golis (880),
ou=Users
Date: 2021.10.01 13:10:25 -08'00'
Stan Golis
(880)
DSR-10/5/25 RBDMS HEW 10/1/2021
MGR15OCT2021 SFD 10/6/2021
ACTIVITY DATE SUMMARY
9/13/2021
T/I/O = 480/0/0.Verified Zero flow on working side OA. Removed working side OA
valve. Installed integral w/ Block vlave and cap. FWHP's 480/0/0 OTG.
9/16/2021
T/I/O = 480/0+/0. Temp = 101*. Steam conductor (Pre wellock). No AL. OA is
cemented to surface (open bleed to a BT). Steamed the conductor ports for 3.5
hours. Cement top in conductor with some gravel. Conductor flute cement top @ the
10 o'clock position = 11" with cement top trending down to the flute @ the 3:30
position (31"). Steam job complete.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:45
9/19/2021
T/I/O = 480/0+/0+. Temp = 100°. OA WellLock Squeeze (repair SC leak). No AL.
OA cemented & Wellocked to surface. Remove 1502 cap & block valve, re-install
1502 cap. Pumped 0.5 gallons of WellLock and squeeze OA to 2500 psi for 6 hrs.
Monitor WH temp & Wellock sample until sample is set up. WH temp between 60° -
90° until sample is set up. Heater installed in well house, man door ajar. Installed
3/4" CNG hose charged w/1500 psi of N2. Final WHPs = 480/0+/1500.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:00
9/21/2021
T/I/O = 480/0+/1360. Temp = 104°. WHPs (post Wellock). No AL. Heater working
properly. Wellock sample set up.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 02:00
9/23/2021
T/I/O = 480/0+/1100. Temp = 104°. WHPs (post Wellock). No AL. Heater not
working properly, attempted to reset burner & called dispatch to fix. Wellock sample
set up.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 05:00
9/24/2021
T/I/O = 480/0+/1110. Temp = 104°. WHPs (post Wellock). No AL. Heater working
properly. Wellock sample set up.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 03:00
Daily Report of Well Operations
PBU B-36A
From:Regg, James B (CED)
To:AOGCC Records (CED sponsored)
Subject:FW: OPERABLE: Producer B-36A (PTD #2170730) Well Lock remedied sustained OA casing pressure
Date:Wednesday, October 13, 2021 8:09:02 AM
Attachments:image001.png
Jim Regg
Supervisor, Inspections
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907-793-1236
From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent: Wednesday, October 13, 2021 7:38 AM
To: Regg, James B (CED) <jim.regg@alaska.gov>
Cc: Wallace, Chris D (CED) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Subject: OPERABLE: Producer B-36A (PTD #2170730) Well Lock remedied sustained OA casing pressure
Mr. Regg,
On 09/19/21 an outer annulus Well Lock down squeeze was performed on Producer B-36A (PTD #2170730). No OA re-pressurization has been observed since the down squeeze, indicating the sustained casing pressure has been remedied. The well is now classified back to OPERABLE.
Please respond with any questions.
Andy Ogg
Hilcorp Alaska LLC
Field Well Integrity / Compliance
andrew.ogg@hilcorp.com
P: (907) 659-5102
M: (307)399-3816
From: Alaska NS - PB - Field Well Integrity <PBFieldWellIntegrity@hilcorp.com>
Sent: Tuesday, September 7, 2021 9:45 AM
To: Regg, James B (CED) <jim.regg@alaska.gov>
Cc: chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; John Condio - (C) <John.Condio@hilcorp.com>; Alaska NS - PB - Field Well Integrity <PBFieldWellIntegrity@hilcorp.com>
Subject: UNDER EVALUATION: Producer B-36A (PTD #2170730) OA casing pressure above MOASP
Mr. Regg,
Producer B-36A (PTD #2170730) has a cemented outer annulus and an OA down squeeze with Well Lock was performed in 2019 to remedy rapid OA re-pressurization. On 09/07/21 Operations reported rapid OA re-pressurization that resulted in a MOASP excursion. The outer annulus pressure
was reported to be 1,053 psi. The well is classified as UNDER EVALUATION to address the rapid OA re-pressurization.
Plan forward:
1. DHD: Open bleed on cemented OA
2. Wellhead: IC pack off test
3. Operations Engineer: Evaluate for Well Lock re-squeeze
4. Well Integrity: Additional diagnostics as needed
Please respond with any questions.
Andy Ogg
Hilcorp Alaska LLC
Field Well Integrity / Compliance
andrew.ogg@hilcorp.com
P: (907) 659-5102
M: (307)399-3816
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considersappropriate.
1
Carlisle, Samantha J (CED)
From:Regg, James B (CED)
Sent:Monday, September 20, 2021 9:36 AM
To:AOGCC Records (CED sponsored)
Subject:FW: UPDATE UNDER EVALUATION: Producer B-36A (PTD #2170730) OA casing pressure above
MOASP
Jim Regg
Supervisor, Inspections
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907‐793‐1236
From: Alaska NS ‐ PB ‐ Field Well Integrity <PBFieldWellIntegrity@hilcorp.com>
Sent: Saturday, September 18, 2021 10:50 AM
To: Regg, James B (CED) <jim.regg@alaska.gov>
Cc: Wallace, Chris D (CED) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; John Condio ‐
(C) <John.Condio@hilcorp.com>; Stan Golis <sgolis@hilcorp.com>
Subject: UPDATE UNDER EVALUATION: Producer B‐36A (PTD #2170730) OA casing pressure above MOASP
Mr. Regg,
Producer B‐36A (PTD #2170730) IA & OA pressures have been bled to 0 psi and the well has been scheduled for a
welllock treatment on the OA. The UNDER EVALUATION clock is being reset to 28 days to accommodate the treatment
and an online monitoring period.
Please call with any questions or concerns.
Ryan Holt
Hilcorp Alaska LLC
Field Well Integrity / Compliance
Ryan.Holt@Hilcorp.com
P: (907) 659‐5102
M: (907) 232‐1005
From: Alaska NS ‐ PB ‐ Field Well Integrity <PBFieldWellIntegrity@hilcorp.com>
Sent: Tuesday, September 7, 2021 9:45 AM
To: Regg, James B (CED) <jim.regg@alaska.gov>
Cc: chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; John Condio ‐ (C)
<John.Condio@hilcorp.com>; Alaska NS ‐ PB ‐ Field Well Integrity <PBFieldWellIntegrity@hilcorp.com>
Subject: UNDER EVALUATION: Producer B‐36A (PTD #2170730) OA casing pressure above MOASP
Mr. Regg,
2
Producer B‐36A (PTD #2170730) has a cemented outer annulus and an OA down squeeze with Well Lock was performed
in 2019 to remedy rapid OA re‐pressurization. On 09/07/21 Operations reported rapid OA re‐pressurization that resulted
in a MOASP excursion. The outer annulus pressure was reported to be 1,053 psi. The well is classified as UNDER
EVALUATION to address the rapid OA re‐pressurization.
Plan forward:
1. DHD: Open bleed on cemented OA
2. Wellhead: IC pack off test
3. Operations Engineer: Evaluate for Well Lock re‐squeeze
4. Well Integrity: Additional diagnostics as needed
Please respond with any questions.
Andy Ogg
Hilcorp Alaska LLC
Field Well Integrity / Compliance
andrew.ogg@hilcorp.com
P: (907) 659‐5102
M: (307)399‐3816
Kaitlyn Barcelona Hilcorp North Slope, LLC
GeoTechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: 907 777-8337
E-mail: kaitlyn.barcelona@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal
Received By: Date:
DATE: 10/05/2021
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL
PBU B-36A (PTD 217-073)
RBT 08/21/2021
Please include current contact information if different from above.
eceived By:
10/05/2021
37'
(6HW
By Abby Bell at 12:15 pm, Oct 05, 2021
7. If perforating:
1. Type of Request:
2. Operator Name:
3. Address:
4. Current Well Class:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Property Designation (Lease Number):10. Field/Pool(s):
Abandon
Suspend
Plug for Redrill Perforate New Pool
Perforate
Plug Perforations
Re-enter Susp Well
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well
Other:
Change Approved Program
Operations shutdown
What Regulation or Conservation Order governs well spacing in thes pool?
Will planned perforations require a spacing exception?Yes No
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD):
PRESENT WELL CONDITION SUMMARY
Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft):
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
12. Attachments:
14. Estimated Date for
Commencing Operations:
13. Well Class after proposed work:
15. Well Status after proposed work:
16. Verbal Approval:
17. I hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approcal.
Proposal Summary Wellbore schematic
BOP SketchDetailed Operations Program
OIL
GAS
WINJ
WAG
GINJ
WDSPL
GSTOR
Op Shutdown
Suspended
SPLUG
Abandoned
ServiceDevelopmentStrastigraphicExploratory
Authorized
Name:
Authorized Title:
Authorized Signature: Date:
Contact Name:
Contact Email:
Contact Phone:
COMMISSION USE ONLY
Commission Representative:
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
Location ClearanceMechanical Integrity TestBOP TestPlug Integrity
Other:
Post Initial Injection MIT Req'd?
Spacing Exception Required?Yes
Yes No
No Subsequent Form Required:
Approved By:Date:
APPROVED BY
THE COMMISSIONCOMMISSIONER
PBU B-36A
OA Squeeze
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400,
Anchorage, AK 99503
217-073
50-029-22667-01-00
N/A
ADL 0028309 & 0028310
13702
Conductor
Surface
Intermediate
Liner
Liner
8853
78
3613
10790
936
2804
12800
20"
9-5/8"
7"
4-1/2"
9040
36 - 114
36 - 3649
33 - 10823
10614 - 11550
10898 - 13702
2430
36 - 114
36 - 3339
33 - 8606
8452 - 8932
8658 - 8853
None
470
3090
7020 / 5410
7500
10530
12800, 13530
1490
5750
8160 / 7240
8430
10160
11980 - 13573 4-1/2" 12.6#L-80 31 - 106209048 - 8903
Structural
4-1/2" Baker S3 Packer
4-1/2" Baker S3 Packer
10383, 8282
10564, 8415
Date:
Stan Golis
Sr. Area Operations Manager
Oliver Sternicki
Oliver.Sternicki@hilcorp.com
907.564.4891
PRUDHOE BAY, PRUDHOE OIL
9/21/2021
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval.
3-1/2" x 3-3/16" x 2-7/8"
No SSSV Installed No SSSV Installed
By Samantha Carlisle at 8:47 am, Sep 08, 2021
321-453
Digitally signed by Stan Golis
(880)
DN: cn=Stan Golis (880),
ou=Users
Date: 2021.09.07 15:56:31 -08'00'
Stan Golis
(880)
10-404
DLB 09/08/2021
MGR15SEP2021
X
DSR-9/8/21
dts 9/15/2021 JLC 9/15/2021
Jeremy Price
Digitally signed by Jeremy
Price
Date: 2021.09.16 10:35:18
-08'00'
RBDMS HEW 9/16/2021
OA WellLock Squeeze
Well: B-36A
PTD: 217-073
API: 50-029-22667-01
Well Name:B-36A Permit to Drill Number:217-073
Well Type P API Number:50-029-22667-01
Job Scope:OA WellLock Squeeze Reg.Approval Req’d?Yes
Current Status:Under Eval, Online Date Reg. Approval Rec’vd:
Estimated Start Date:09/22/2021 Estimated Duration:2days
Regulatory Contact:Mel Rixse
First Call Engineer:Oliver Sternicki
Second Call Engineer:Wyatt Rivard
Brief Well Summary:
B-36A is a natural flow producer. On 9/7/21 the OA exceed MOASP. The OA of B-36A was cemented to
surface on 9/13/08 as part of a RWO to repair a SC leak. Since the OA was cemented, it has seen periods
of OA repressurization. Due to this, the OA was Wellocked on 10/11/2019.
Current Status:
B-36A is currently under evaluation starting 08/21/2021.
Scope of Work:
Squeeze OA with Well Lock (or similar) to repair surface casing leak.
Procedure:
1 Valve Shop ND OA GATE VALVE, NU OA INTEGRAL
2 DHD STRAP TOC. TOP OA WITH CEMENT AS NEEDED. WELL LOCK OA
SQUEEZE
3 Special Projects A/DHD WELL LOCK SQUEEZE
4 DHD POP U/E, MONITOR FOR SC LEAK,
5 Valve Shop ND OA INTEGRAL, NU OA GATE VALVE
6 DHD RE-SQUEEZE OA WITH WELL LOCK IF NECESSARY.
-00 DLB
OA WellLock Squeeze
Well: B-36A
PTD: 217-073
API: 50-029-22667-01
From:Regg, James B (CED)
To:AOGCC Records (CED sponsored)
Subject:FW: UNDER EVALUATION: Producer B-36A (PTD #2170730) OA casing pressure above MOASP
Date:Tuesday, September 7, 2021 12:10:08 PM
Attachments:image001.png
B-36A.pdf
Reviewed 9/7/2021
Jim Regg
Supervisor, Inspections
AOGCC
333 W. 7th Ave, Suite 100
Anchorage, AK 99501
907-793-1236
From: Alaska NS - PB - Field Well Integrity <PBFieldWellIntegrity@hilcorp.com>
Sent: Tuesday, September 7, 2021 9:45 AM
To: Regg, James B (CED) <jim.regg@alaska.gov>
Cc: Wallace, Chris D (CED) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; John Condio - (C) <John.Condio@hilcorp.com>; Alaska NS - PB - Field Well Integrity <PBFieldWellIntegrity@hilcorp.com>
Subject: UNDER EVALUATION: Producer B-36A (PTD #2170730) OA casing pressure above MOASP
Mr. Regg,
Producer B-36A (PTD #2170730) has a cemented outer annulus and an OA down squeeze with Well Lock was performed in 2019 to remedy rapid OA re-pressurization. On 09/07/21 Operations reported rapid OA re-pressurization that resulted in a MOASP excursion. The outer annulus pressure
was reported to be 1,053 psi. The well is classified as UNDER EVALUATION to address the rapid OA re-pressurization.
Plan forward:
1. DHD: Open bleed on cemented OA
2. Wellhead: IC pack off test
3. Operations Engineer: Evaluate for Well Lock re-squeeze
4. Well Integrity: Additional diagnostics as needed
Please respond with any questions.
Andy Ogg
Hilcorp Alaska LLC
Field Well Integrity / Compliance
andrew.ogg@hilcorp.com
P: (907) 659-5102
M: (307)399-3816
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considersappropriate.
Operator Name:2.
Development Exploratory
Service
5
Permit to Drill Number:217-073
6.50-029-22667-01-00
PRUDHOE BAY, PRUDHOE OIL
Hilcorp North Slope, LLC 5.
Well Name and Number:8.
10.Field/Pools:
Well Class Before Work4.
Present Well Condition Summary:11.
Total Depth: measured feet
feet
Plugs measured feet
feet
Effective Depth: measured feet
feet
Packer measured feet
feettrue vertical true vertical
13702
12800
9040
10383, 10564
None
12800, 13530
8282, 8415
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 78 20" 36 - 114 36 - 114 1490 470
Surface 3613 9-5/8" 36 - 3649 36 - 3339 5750 3090
Intermediate 10790 7" 33 - 10823 33 - 8606 8160 / 7240 7020 / 5410
Liner 936 4-1/2" 10614 - 11550 8452 - 8932 8430 7500
Perforation Depth: Measured depth: 11980 - 13573
feet
True vertical depth:9048 - 8903 feet
Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 31 - 10620 31 - 8456
10383 8282Packers and SSSV (type, measured and
true vertical depth)
4-1/2" Baker S3 Packer
Liner 2804 10898 - 13702 8658 - 8853 10160 10530
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
N/A
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
9451810836256
Representative Daily Average Production or Injection Data
Prior to well operation:
Subsequent to operation:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name:
Contact Email:
Wyatt Rivard
wrivard@hilcorp.com
Authorized Name:Stan Golis
Authorized Title:
Authorized Signature with Date:Contact Phone:907.777.8547
Treatment descriptions including volumes used and final pressure:
13.
Sr. Area Operations Manager
Operations Performed1.
Abandon Plug Perforations 5 Fracture Stimulate Pull Tubing
GSTOR WINJ WAG GINJ SUSP SPLUG
16. Well Status after work:Oil 5 Gas
Exploratory Development 5 Stratigraphic
15. Well Class after work:
Service
WDSPL
14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283)
Daily Report of Well Operations
Copies of Logs and Surveys Run
true vertical measured8853
Sundry Number or N/A if C.O. Exempt:
321-378
4-1/2" Baker S3 Packer 10564 8415
Junk
Packer
Printed and Electronic Fracture Stimulation Data
5
Extended Perf w CTU
Operations shutdown
Change Approved Program
5
N/A
Senior Pet Engineer:Senior Res. Engineer:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Suspend Perforate Other Stimulate Alter Casing
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well
3.Address: 3800 Centerpoint Dr, Suite
1400, Anchorage, AK 99503
7.Property Designation (Lease Number):ADL 0028310 & 0028309 PBU B-36A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
Stratigraphic
Other:
API Number:
Form 10-404 Revised 03/2020 Submit Within 30 days of Operations
3-1/2" x 3-3/16" x 2-7/8"
343 20369 535 9091200
1250
No SSSV Installed
By Samantha Carlisle at 9:15 am, Sep 07, 2021
Digitally signed by Stan Golis
(880)
DN: cn=Stan Golis (880),
ou=Users
Date: 2021.09.04 16:36:51 -08'00'
Stan Golis
(880)
MGR11OCT2021 RBDMS HEW 9/7/2021
DSR-9/7/21 SFD 9/7/2021
ACTIVITY DATE SUMMARY
8/4/2021
**WELL S/I ON ARRIVAL**
PULLED PRONG & EQ'D PX @ 10408'MD
**WSR CONT ON 8/5/21**
8/5/2021
**WSR CONT'D FROM 8/4/21**
PULLED PX PLUG BODY @ 10408'MD
**WELL S/I ON DEPARTURE**
8/20/2021
CTU #6 1.75" CT Job oblective: Drift / CBL log / Set CIBP / Ext Adperf
MIRU CTU. Begin Weekly BOP test
***Continued on 08/21/21***
8/21/2021
CTU #6 1.75" CT Job oblective: Drift / CBL log / Set CIBP / Ext Adperf
Complete Weekly BOP test. Make up 2.25" JSN drift and RIH. Bullhead 180 bbls of
slk 1% kcl w/safelube and WHP coming up rapidly. Bleed IA to prevent gas migration
into tubing. Continue to RIH and set down in perfs at 12922 but able to drift clean with
only 0.5-1k weight bobbles. Drift to CIBP and tag at 13500' CTMD, pick up and paint
white/yellow TD flag at 13450'. POOH. Make up HES RBT cement bond log BHA and
RIH. Unable to load well, circulate to ensure liner is liquid packed and log from 13450
to 10550'. Flag pipe at 12700'. Pooh.
***Continued on 08/22/21***
8/22/2021
CTU #6 1.75" CT Job oblective: Drift / CBL log / Set CIBP / Ext Adperf
Receive good data (+31' correction). Town analyzed the data and emailed a revision
to the perforation depths, now only 11980'-12200'. Correlate to Baker Hughes RPM
Log dated 05-July-2017. Make up 2-7/8" NS CIBP. RIH to flag, correct depth. Set
CIBP at 12800' MD. (ME at 12800.42'). PT CIBP to1548 psi. Lost 17 psi in 10 mins.
Pooh circulating out any gas. Confirm well killed at surface. Trim Coil. Make up 220'
of 2" MaxForce Perf guns, 6 spf. RIH and tie-in to CIBP. Perforate 11980'-12200'.
POOH maintaining hole fill. Confirm well killed and surface and lay down perf gun
BHA. Freeze protect well w/ 5 bbls 50/50 & 33 bbls of diesel.
***Job Complete***
Daily Report of Well Operations
PBU B-36A
Operator Name:2.
Exploratory Development
Service
5
Permit to Drill Number:217-073
6.API Number:50-029-22667-01-00
PRUDHOE BAY, PRUDHOE OIL
Hilcorp North Slope, LLC 5.
Field/Pools:9.
Well Name and Number:
ADL 0028310 & ADL 0028309
Property Designation (Lease Number):10.
8.
PBU B-36A
7.If perforating:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception?
Stratigraphic
Current Well Class:4.
Type of Request:1.Abandon Plug Perforations 5 Fracture Stimulate Repair Well
Operations shutdown
Op Shutdown
GAS
GSTOR WAG
SPLUG
Abandoned
Oil 5 WINJ
Exploratory Development 5Stratigraphic Service
WDSPL
12. Attachments:
PRESENT WELL CONDITION SUMMARY
13702
Effective Depth MD:
L-80
11.
8/9/2021
Commission Representative:
15.
Suspended
Contact Name: Wyatt Rivard
Contact Email: Wyatt.Rivard@hilcorp.com
Authorized Name: Stan Golis
Authorized Title:Operations Manager
Authorized Signature:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other:
Yes No Spacing Exception Required?Subsequent Form Required:
Approved by:COMMISSIONER
APPROVED BYTHE
COMMISSION Date:
5OtherAlter Casing
Pull Tubing
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
COMMISSION USE ONLY
17. I hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Detailed Operations Program
Packers and SSSV Type:
No SSSV Installed
Packers and SSSV MD (ft) and TVD (ft):
Perforation Depth MD (ft):Tubing Size:
Size
Total Depth MD (ft):Total Depth TVD(ft):
8853
Effective Depth TVD:Plugs (MD):Junk (MD):
Other Stimulate
Re-enter Susp Well
Suspend
Plug for Redrill
55Perforate
Perforate New Pool
10383 , 10564
8282 , 8415
Date:
Liner 2804 3-1/4" x 3-3/16" x 2-7/8" 10898 - 13702 8658 - 8853 10160 10530
Well Status after proposed work:
16. Verbal Approval:
Change Approved Program
36 - 3649 36 - 3339
14. Estimated Date for Commencing Operations:
BOP Sketch
36 - 114
Structural
8160 / 7240
Proposal Summary 13. Well Class after proposed work:
4-1/2" Baker S-3
12868 - 13573 9038 - 8903 4-1/2" 12.6# 31 - 10620
Production
13530 8918 13530 none
36 - 114 470
9-5/8"
7"
Contact Phone:(907) 777-8547
Date: 7-29-21
7020 / 5410
78 149020"Conductor
3090
GINJ
5
Post Initial Injection MIT Req'd? Yes No
5
Comm.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Surface 3613 5750
Intermediate 10790 33 - 10823 33 - 8606
936 4-1/2"10614 - 11550 8452 - 8932 8430 7500
Address:3800 Centerpoint Dr, Suite 1400,
Anchorage, AK 99503
3.
No 5Yes
Casing Length MD TVD Burst
Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft):
Collapse
MPSP (psi):
Wellbore Schematic
2430
Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval.
CTU Extended Perforating
By Meredith Guhl at 2:19 pm, Jul 29, 2021
321-378
Digitally signed by Stan Golis
(880)
DN: cn=Stan Golis (880),
ou=Users
Date: 2021.07.29 12:45:16 -08'00'
Stan Golis
(880)
DLB07/29/2021MGR29JUL2021 DSR-7/29/21
X 10-404
dts 7/30/2021
JLC 7/30/2021
Jeremy Price
Digitally signed by Jeremy
Price
Date: 2021.07.30 11:00:12
-08'00'
RBDMS HEW 7/30/2021
Plug and perf
B-36A
PTD: 217073
Well Name:B-36A CTU Plug & Add
Perf
API Number: 50-029-22667-01
Current Status:Producing Rig:SL, CTU & Surface
Deployed TCP Guns
Estimated Start Date:8/9/2021 Estimated Duration 3days
Program Date 7/23/2021 Permit to Drill Number:217073
Regulatory Contact:Abbie Barker (907) 564-4915 (O)
First Call Engineer:Wyatt Rivard (907) 777-8547 (O) (509) 670-8001 (M)
Second Call Engineer:Noel Nocas (907) 564-5278 (O) (907) 229-9532 (M)
Expected Rates 531 BOPD, 10 BWPD and 25 mmscfd (30 Day IOR – 180)
Current Bottom Hole Pressure:3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP)
Maximum Expected BHP:3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP)
Max. Anticipated Surface Pressure:2430psi (Based on .1psi/ft gas gradient)
Last SI WHP:2300 psi (Taken on 2/15/21)
Min ID:2.31” X NIP at 10900’ MD
Max Angle:114 deg at 13602’
Reference Log:BHI RPM log dated 7/5/17
Brief Well Summary:
B-36A is 2017 natural flow sidetrack with CIBP set at 13530’ MD and 96’ of perfs added in Z2A as of Oct 2020.
Latest perforations gas’d out immediately with gas increasing from pre plug/perf rate of 23 MMSCFD to 36
mmscfd. A bond log is needed prior to proceeding with next stage of perforations to confirm isolation from
high GOR toe perfs.
Objective:Log CBL to confirm isolation between pevious and proposed perfs. Utilize CTU to isolate existing
perforations then surface deploy TCP guns with CTU to add new perfs and improve GOR.
Sundry Procedure (Approval Required to Proceed):
Note: The well will be killed and monitored before making up the extended perfs guns. This is generally done
during the drift/logging or plug set run. This will provide guidance as to whether the well will be killed by
bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it
will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to
shear the firing head.
Slickline
1. MIRU SL unit and pressure test
2. RIH and pull TTP at 10408’ MD
3. RDMO
Coil Tubing
4. MIRU Coiled Tubing Unit, spot ancillary equipment and PT.
5. Bullhead ~270 bbls of 8.4 ppg 1% KCl or equivalent down the tubing to the formation to kill well ahead
of extended perforations and fluid pack well for logging.
a. Wellbore volume = 10800’ X .0152bpf + .0079bpf x 1000’ +.0058 bpf x 1000’= 180 bbls
b. Freeze protect tubing as needed.
6. MU Cement Bond Logging tools and RIH.
7. Log CBL up from CIBP at ~13530’ MD to 10,660’ MD stopping at ±12,400’ MD to paint flag.
*
-00 DLB
Plug and perf
B-36A
PTD: 217073
c. Log Repeat pass from 11,100’ MD to 10,660’ MD
8. POOH and confirm good data. Obtain corrected flag.
9. MU 2-7/8” CIBP and RIH and correct to flag .
d. Contact OE Wyatt Rivard 1(509) 670-8001 or Noel Nocas at 1(907) 229-9532 prior to setting
plug/perforating for final approval of tie-ins
10. Set plug mid-joint at ±12,800’ MD and test to 1500 psi. POOH.
e.Contingency: CIBP target set depth may be moved up hole based on CBL data if poor
cement found between 12,800’ and previous CIBP/perfs.
11. MU single 31ft 2” gun, 6 spf, 60 deg phased with deep penetrating charges.
f.Contingency: If CBL data showed poor cement between 12626’ and previous CIBP/perfs
then skip conventional gun run Steps 11-13 and proceed directly to upper extended add
perf Step 14.
12. RIH as conventional gun run (with PCE) and correlate to flag.
Gun
Run #Perf Top Perf
Bottom
Perf
Length
1 ±12595 ±12626 ±31
Total ±31
Table 1: B-36A Proposed Conventional Ad-Perf Gun Run
13. Perforate interval per Table 1: B-36A Proposed Conventional Ad-Perf Gun Run. POOH.
g.Contingency: If CBL data showed poor cement between 12626’ and previous CIBP/perfs
then cancel lower moved up hole based on CBL data if poor cement found between
12,800’ and previous CIBP/perfs.
h. Note any tubing pressure change in WSR.
14. At surface, prepare for deployment of TCP guns. Assure excess fluids available if needed to keep hole
full.
15. Confirm well is dead. Bleed any pressure off to returns tank. Kill well w/8.4 ppg 1% KCl or equivalent
as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is
reestablished.
16. Pickup safety joint and TIW valve and space out before MU guns. Review well control steps with crew
prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety
joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the
working platform for quick deployment if necessary.
17. Break lubricator connection at QTS and begin makeup of TCP guns per Table 2: B-36A Proposed Extended
Ad-Perf Gun Run below.
Gun Run
#Perf Top Perf
Bottom
Perf
Length
2 ±11980 ±12230 ±250
Total ±250
Table 2: B-36A Proposed Extended Ad-Perf Gun Run
18. RIH and correlate to flag.
19. Pickup and perforate intervals per Table 2: B-36A Proposed Extended Ad-Perf Gun Run. POOH.
a. Note any tubing pressure change in WSR.
20. POOH. Stop at surface to reconfirm well dead and hole full.
21. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown
of TCP gun string.Standing orders flow chart included with this sundry request.
MU lubricator
*See note above regarding kill methods if pressure observed at
surface after perforating.
Plug and perf
B-36A
PTD: 217073
22. RDMO CTU.
23. RTP or FP well.
Attachments:
1. As-built Schematic
2. Proposed Schematic
3. Coil Tubing BOPE Schematic
4. Equipment Layout Diagram
5. Standing Orders for Open Hole Well Control during Perf Gun Deployment
6. Tie In Log/Perf Sheet
Plug and perf
B-36A
PTD: 217073
Wellbore Schematic
Plug and perf
B-36A
PTD: 217073
Proposed Schematic
Plug and perf
B-36A
PTD: 217073
Coiled Tubing BOPs
Plug and perf
B-36A
PTD: 217073
Equipment Layout Diagram
Plug and perf
B-36A
PTD: 217073
Standing Orders for Open Hole Well Control during Perf Gun Deployment
Plug and perf
B-36A
PTD: 217073
B-36A Tie-In Log
Plug and perf
B-36A
PTD: 217073
Plug and perf
B-36A
PTD: 217073
Plug and perf
B-36A
PTD: 217073
Plug and perf
B-36A
PTD: 217073
Operator Name:2.
Development Exploratory
Service
5
Permit to Drill Number:217-073
6.50-029-22667-01-00
PRUDHOE BAY, PRUDHOE OIL
Hilcorp North Slope, LLC 5.
Well Name and Number:8.
10.Field/Pools:
Well Class Before Work4.
Present Well Condition Summary:11.
Total Depth: measured feet
feet
Plugs measured feet
feet
Effective Depth: measured feet
feet
Packer measured feet
feettrue vertical true vertical
13702
13530
8918
10383, 10564
13530
8282, 8415
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 78 20" 36 - 114 36 - 114 1490 470
Surface 3613 9-5/8" 36 - 3649 36 - 3339 5750 3090
Intermediate 10790 7" 33 - 10823 33 - 8606 8160, 7240 7020, 5410
Liner 936 4-1/2" 10614 - 11550 8452 - 8932 8430 7500
Perforation Depth: Measured depth: 12868 - 13573
feet
True vertical depth:9038 - 8903 feet
Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# L-80 31 - 10620 31 - 8456
10383, 10564 8282, 8415Packers and SSSV (type, measured and
true vertical depth)
4-1/2" Baker S-3
Liner 2804 10898 - 13702 8658 - 8853 10160 10530
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
n/a
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
93408239
1935927 0
23565
110 947
Representative Daily Average Production or Injection Data
Prior to well operation:
Subsequent to operation:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name:
Contact Email:
Wyatt Rivard
wrivard@hilcorp.com
Authorized Name:Stan Golis
Authorized Title:
Authorized Signature with Date:Contact Phone:(907)777-8547
Treatment descriptions including volumes used and final pressure:
13.
Operations Manager
Operations Performed1.
Abandon Plug Perforations 5 Fracture Stimulate Pull Tubing
GSTOR WINJ WAG GINJ SUSP SPLUG
16. Well Status after work:Oil 5 Gas
Exploratory Development 5 Stratigraphic
15. Well Class after work:
Service
WDSPL
14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283)
Daily Report of Well Operations
Copies of Logs and Surveys Run
true vertical measured8853
Sundry Number or N/A if C.O. Exempt:
n/a
No SSSV
Junk
Packer
Printed and Electronic Fracture Stimulation Data
5
Operations shutdown
Change Approved Program
n/a
Senior Pet Engineer:Senior Res. Engineer:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Suspend 5Perforate Other Stimulate Alter Casing
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well
3.Address: 3800 Centerpoint Dr, Suite
1400, Anchorage, AK 99503
7.Property Designation (Lease Number):ADL 028309 & 028310 PBU B-36A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
Stratigraphic
Other:
API Number:
Form 10-404 Revised 03/2020 Submit Within 30 days of Operations
3-1/2" x 3-3/16" x 2-7/8"
By Samantha Carlisle at 9:50 am, Oct 20, 2020
Digitally signed by Stan Golis
DN: cn=Stan Golis,
ou=Users
Date: 2020.10.20 05:37:50 -
08'00'
Stan Golis
DSR-10/20/2020 SFD 10/20/2020MGR22OCT2020RBDMS HEW 11/13/2020
ACTIVITY DATE SUMMARY
10/11/2020
CT #9 1.75" Coil Tubing - Job Scope = Drift/Log, CIBP, AdPerf
MIRU, MU BOT CTC and Reed Memory Gamma/CCL lgging tools and 2.25" drift
nozzle. Load the tubing with KCL and Safe lube, RIH.
***Job Continued on 10/12/2020***
10/12/2020
CT #9 1.75" Coil Tubing - Job Scope = Drift/Log, CIBP, AdPerf
RIH wtih BOT CTC and Reed Memory gamma/CCL w/ 2.25" nozzle. Drifted to 13588
ctm. Perfom tie in log. Correlate to BHI LWD GR-MPR 27-June-2017. MU & RIH w/
Northern Solutions CIBP (2.1" OD). Correct depth at Flag. Set CIBP (Middle
Element) at 13530'. Pressure test CIBP to 1500psi - pass. POOH. MU and RIH w/
Gun number 1.
***Job Continued on 10/13/2020***
10/13/2020
CT #9 1.75" Coil Tubing - Job Scope = Drift/Log, CIBP, AdPerf
RIH w/ HES Millenium Perf Gun #1. Tag CIBP, correct depth. PUH & Perforate from
12932'-12964' w/ 2.00" Millenium 6spf. POOH. RIH w/ HES Millenium Perf Gun #2.
Tag CIBP, correct depth. PUH & Perforate from 12900'-12932' w/ 2.00" Millenium
6spf. POOH. RIH w/ HES Millenium Perf Gun #3. Tag CIBP, correct depth. PUH &
Perforate from 12868'-12900' w/ 2.00" Millenium 6spf. RDMO.
***Job Complete***
Daily Report of Well Operations
PBU B-36A
new perfs
STATE OF ALASKA RECej V
ALASKA OIL AND GAS CONSERVATION COMMISSION E®
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed NOV
(� +
Abandon 11Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations ShJltlL2019 ❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Cha ngg Approved Program ❑
Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑
Oth�f�gf�Laos e
2. Operator Name: BP Exploration (Alaska), Inc
4. Well Class Before Work
Development 0 Exploratory ❑
5. Permit to Drill Number: 217-073
3. Address: P.O. Box 196812 Anchorage,
AK 99519-6612
Stratigraphic ❑ Service❑
6. API Number 50-029-22667-01-00
7 Property Designation (Lease Number): ADL 028310 & 028309
8. Well Name and Number: PBU B -36A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pools:
PRUDHOE BAY, PRUDHOE OIL
11. Present Well Condition Summary:
Total Depth: measured 13702 feet Plugs measured None feet
true vertical 8853 feet Junk measured None feet
Effective Depth: measured 13666 feet Packer measured 10383, 10564 feet
true vertical 8866 feet Packer true vertical 8282, 8415 feet
Casing:. Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 78 20" 36-114 36-114 1490 470
Surface 3613 9-5/8" 36-3649 36-3339 5750 3090
Intermediate 10790 7" 33-10823 33-8606 7240/8160 5410 / 7020
Liner 936 4-1/2" 10614 - 11550 8452-8932 8430 7500
Liner 2804 3-1/2" x 3-1/4" x 2- 10898 - 13702 8658 - 8853
Perforation Depth: Measured depth: 13553 - 13573 feet
True vertical depth: 8910-8903 feet
Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6#, 13Cr80 / L-80 31 -10620 31 -10620
Packers and SSSV (type, measured and 4-1/2" Baker S-3 Perm Packer 10383 8282
true vertical depth)
4-112" Baker S-3 Perm Packer 10564 8415
12. Stimulation or cement squeeze summary:
Intervals treated (measured): OA cemented to surface. Strap OA @ 32.5".
Treatment descriptions including volumes used and final pressure: Laid in 5.17 gallons of WeIlLock from bottom up, evacuated an additional 3.0 gallons of fluid &
grease (4.5 gallons total) Installed sweeping 90 and 3' stand pipe. Pumped 2.5 gallons of Well-ock (7.5 gallons total) to fill stand pipe and squeeze OA to 2500
psi. Monitor OAP & SH Temp for next 24 hrs. Monitored WHPs and SH Temp post OA Wellock squeeze until Wellock sample is fully cured.
Final Pressures: OA = 0 psi, IA = 0 psi, TBG = 740 psi
13. Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
258
23827
6
0
878
Subsequent to operation:
Shut In
0
740
14. Attachments: (required per 20 MC 25.070.25.071, s 25.2e0)
15. Well Class after work:
Daily Report of Well Operations Z
Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
319-195
Authorized Name: Lastufka, Joseph N Contact Name: Tempel, Joshua
Authorized Title: Specialft Contact Email: Joshua.Tempel@bp.com
Authorized Signature: Date: Contact Phone: 1 9078915930
Form 10.404 Revised 04/2077,,e`;' , e RBDMS OV 0 5 2019 Submit Original Only
-Daily Report of Well Operations
PBU B -36A
ACTIVITYnATF el uAu• MW
T/I/O = SSV/300/350. Temp = SI. Bleed OAP to 0 psi & strap TOC (pre Wellock). AL
disconnected. OA FL @ cemented to surface. Bled OAP from 350 psi to 0 psi in —1 min, gas. Held
open bleed for 1 hr for valve shop to C/O casing valve. Strapped OA cement top @ —14".
10/1/2019
Valve shop in control of well upon departure. 11:00
T/I/O=SI/300/350. Pre well lock. RD OA. RU intragal and block valve with 1502 cap. Installed
wireless gage on 1502 cap.***JOB COMPLETE***. See log for details. Final WHP's SI/300/0. MV
10/1/2019
open SSV,SV and WV closed. IA and OA open to gage. OA valve is well house.
T/I/O = 1860/330/350. Temp = SI. Bleed IAP & OAP to 0 psi (WellLock Squeeze). AL
disconnected. Intergal and 2" hardline valve on OA. IA FL @ 6909' (Sta # 3, Dome). OA FL @
cemented to surface. Bled IAP to OT from 330 psi to 0 psi in 2 hrs, all gas. IA FL unchanged. Bled
OAP to 0 psi in <1 min, all gas. Held open bleed on OA for 2 hrs. Monitored for 30 min. Heater is
still installed and doors are open and tree cap bled to 0 psi. Final WHPs = 1680/0/0.
10/10/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 03:15
T/I/O = SSV/0/110. Temp = SI. OA WellLock Squeeze. AL disconnected. OA cemented to
surface. Bled OAP from 110 psi to 0 psi in <1 min (all gas). Monitor OAP for 1 hr for no observable
flow. Remove 1502 cap & block valve, strap OA @ 32.5" (-3.2 gallons). Evacuate —1.5 gallons of
fluid from OA w/ suction pump. Laid in 5.0 gallons of WellLock from bottom up, evacuated an
additional 3.0 gallons of fluid & grease (4.5 gallons total). Installed sweeping 90 and 3' stand pipe.
Pumped 2.5 gallons of WellLock (7.5 gallons total) to fill stand pipe and squeeze OA to 2500 psi.
Monitor OAP & SH Temp for next 24 hrs.
10/11/2019
***WSR continued on 10/12/19***
***WSR continued from 10/11/19***
T/I/O = SSV/0/1760. Temp = SI. OA WellLock Squeeze. AL disconnected. OA cemented to
surface. Monitored WHPs and SH Temp post OA Wellock squeeze. Bled OAP from 1720 psi to
760 psi post monitor (-1 tablespoon of WellLock, mostly gas). WellLock has consistency of warm
honey. 1 door partially open, other door closed. Tag hung. Final WHPs = SSV/0/780, SH Temp =
80*.
10/12/2019
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 12:30
T/I/O = SSV/0/820. Temp = SI. WHPs & WH Temp (Post WellLock). AL disconnected. WH Temp
= 89°. OAP decreased 10 psi and WH temp increased 1° in 15 hrs. WellLock sample has
consistency of warm honey. Both well house doors and heater vent partially open.
10/13/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 15:50
TWO = SSV/0/770. Temp = SI. WHPs & WH Temp (Post WellLock). AL disconnected. WH Temp
= 87°. OAP decreased 10 psi and WH Temp increased 11 * in 15.5 hrs. WellLock sample is tacky
and has consistency of cold molasses. Both well house doors partially open.
10/14/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 12:45
TWO = SSV/0/730. Temp = SI. WHPs & WH Temp (Post WellLock). AL disconnected. WH Temp
= 870. OAP decreased 40 psi and WH Temp unchanged in 14 hrs. WellLock sample is tacky and
is starting to solidify. Both well house doors partially open.
10/15/2019
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 02:50
T/I/O = SSV/0/650. Temp = SI. WHPs & WH Temp (Post WellLock). AL disconnected. WH Temp
= 90°. WellLock sample is no longer tacky but can be indented with fingernail. Both well house
doors partially open.
10/16/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 03:20.
T/I/O = SSV/0/540. Temp = SI. WHPs & WH Temp (Post Wellock). WH Temp = 70°. Wellock
sample set up hard.
10/17/2019
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 23:30.
TWO = SSV/0/560. Temp = SI. WHPs (Post Wellock). AL spool disconnected. WH temp = 62*.
Adjusted heater trunk closer to casing. CNG hose rigged up to OA jewelry being used as an
accumulator.
10/18/2019
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 11:10
Daily Report of Well Operations
PBU B-36A
T/I/O = SSV/0/580. Temp ;'—ST. WHPs & WH Temp. (Post WellLock). AL spool disconnected.
WH temp = 86°. Wellock sample set up hard. One wellhouse door open.
10/19/2019
SV, WV, SVV = C. MV = O. IA, OA = OTG. 15:00
TWO = SSV/0/560. Temp = SI. WHPs & WH temp. (Post WeIILo k). AL disconnected. WH temp
= 80*. Heater in wellhouse, one door open. Wellock sample set up hard.
10/20/2019
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 09:30
T/l/O = SSV/0/550. Temp = Sl. WHPs & WH temp. (Post Welll-ock). WH temp = 88°. Both man-
doors closed with 2nd heater outlet fully open. Wellock sample appears to be fully cured.
10/22/2019
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 23:59.
TWO = SSV/0/240. Temp = SI. WHPs (Post Wellock). WH temp = 60*. Adjusted heater trunk.
Wellock sample is fully cured.
10/23/2019
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 12:45
T/I/0 = SSV/0/220. Temp = SI. WHPs (Post Wellock). WH temp = 80*. Adjusted heater trunk.
Wellock sample is fully cured.
10/24/2019
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 03:30
TWO = SSV/0/220. Temp = SI. WHPs (Post Wellock). WH temp = 58°. Shut wellhouse door.
Wellock sample is fully cured.
10/25/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 23:59.
T/I/O=SI/200/0 Removed Integral flange and jewelry from OA outlet and installed gate valve.
10/26/2019
Torqued to API specs. FWP's SI/200/0
TWO = SSV/O+/O+. Temp = SI. WHPs (Post Wellock). No AL. WHPs unchanged overnight.
Wellock sample is set up. Pulled heater.
10/27/2019
SV, WV, SSV = C. MV = 0. IA, OA = OTG. 13:00
WELLHEAD=
FMC
ACTUATOR =
DEV
OKB. aR =76.91'
LATCH
REE ELBI=
76.91'
BF. R" =
43.23'
KOP=
12W
Max Angle =�
114" ! 13602'
Datum NO
11396'
TJatum TVP=
-8$00' SS
91-5#, H -40,D =19.124'
269. L-80 BTG D = 6276" 3244'
40#, L-80 BTC, D = 8.835" 3649'
7" C5G. 26#, L-80 8T6AL D = 6276' -t 9'
Minimum ID = 2.31" @ 10900'
HES X NIP IN LTP WIPTSA
& JFE
4-112' TBG,
D = 3-958'
7" CSG, 29#, 13CR NSCC, ID= 6,184-
13- X 3-114" X 2-7/8" TOUT
D = 2.992" H 11648'
''2'UNI 12.8#, 73CR NSCT, ^•11550'
A152 bpf, ID = 3.953'
6.69, 13CR-85 TCS, .0079 bpf, D = 2.650" 11931'
PERFORATION SUIMR9ARY
REF LOG: ON
ANGLEATTOPPE RP: 111` @ 13553'
Note: Refer to Production DB for historical pert data
I
-EISPFI NI6RVAL OpnISgz I SHOT I SOZ
• I 6 1'1551- 11171 If A IMIAW471
LPBTDJ 13666'
13CR•85 STL, .0058 bpf, D= 2.441" 13702'
B 36A Lc,AHr4o1!
NOTES: WELL ANGLE> 70* @ 11495""
E TBG, CSG& LINER***MAX DLS:262- @
2086• 4-12" HES X NP, D = 3.813"
7" HES ES C9N J
9-518" X 7- BKR BC PXR
GAS I. FT AAA Nf1RR C
ST
MD
TVD
DEV
TYPE VLV
LATCH
LT1Rr
DOTE
4
3804
3452
43
KGB2 DOAE
BK
16
03/16/17
3
6909
5706
42
KGB2 DOA,E
BK
16
03!16!17
2
8942
7209
42
KGB2 ow
BK
0
09/10/08
1
10266kI961
41
KGB2 DA71'
BK
0
09/10/08
10374' ��7" X 4-72" BKR S -S PI(R D = 3.870"
10408' 4-12" FES XNP. D = 3.813"
1062$' 7" X 4-72" UIJOUE OVBZSFDT
10663' 4-112" HES X NP, D = 3.813"
10664'
7' X 4-72" BKR S3 PKR D = 3.875"
10687'
4-12" FES X NP, D = 3.673"
10606"
4-112" FES XN NP IALLED TO 3.80"
10614'
10'TNYTEBACK SLV. D=5.241'
X
I2'TW DOVE TAIL
FIGR, D - 3.915'
LTPwD
DEFLOY
MENT SLV, D=
Iusuu" I-)FIE6X NP,D=2.31"
10920" 3-12' X NP, D = 2.613'
11648' 3-12"X3-3/16' XO, D = 2.786'
MLLOUT WINDOW (B -36A) 11550'- 11560-
1931' H 33116" X 2-78" XO, D = 2.377"
PRUDHOE BAY LW
WALL B -36A
PEFW W: 217-073
API No: 50-029-22667-01
SEC 31, T71N, R14E 529' FNL & 1894' FFL
DATE REV BY COMMENTS
DATE REV BY 00MMB4TS
05/22/96 N28E ORIGINAL COMPLETION
06/22/17 JNJJMD ADD®BF & REFELEV
OW04106 D76 RWO
07/03117 JMD DRLG HO aww=Ns
09111106 D16 RIND
07/05/17 RdJJ D FMLODEAPPFDVAL
07/01/17 N•CDR2 CTDSIDEfRACK(B•36A)
07/10!17 JC/JMD ADFERF5 (07/06/17)
06/08/17 lMD BUILT PROPOSED
06/30/17 659JAD SET LTPw/PTSA & X NP (06/26117)
BP Exploration (Alaska)
0622/17 JTMUMD MLL®XN NP&SET WSw/PPTAG
THE STATE
°f11.
GOVERNOR MIKE DUNLEAVY
Katherine O'Connor
Integrity and Interventions Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B -36A
Permit to Drill Number: 217-073
Sundry Number:319-059
Dear Ms. O'Connor:
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aOgcc.olaska.gov
The AOGCC denies the enclosed application for sundry approval relating to the above -referenced
well. The reason for this denial is the AGOCC will require recent TIO plots, an OA injectivity
test, and another MIT -IA (or CMIT TxIA) before placing well lock in the OA in a manner that
could mask communication to the OA (surface and/or shoe) from the IA.
This denial is without prejudice to your right to resubmit an application in the future if you are
able to provide the necessary supporting information.
As provided in AS 31.05.080(a), within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend. A person may not appeal an AOGCC decision to
Superior Court unless reconsideration has been requested.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner
DATED this 2-o dray of February, 2019.
RBDMS S49 2 0119
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
CE' VE
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing❑ Change
g Approved Program -,p
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other OA WellLock Squeeze 0
2, Operator Name: BP Exploration (Alaska), Inc
4. Current Well Class:
Exploratory ❑ Development 0 -
5. Permit to Drill Number 217-073
3. Address: P.O. Box 196612 Anchorage, AK
99519-6612
Stratigrephic ❑ Service ❑
6. API Number: 60-029-22667-01-00
7. If perhat
Regula
What Regulation or Conservation Order governs well spacing in this pool?
B. Well Name and Number:
Will planned perforations require a spacing exception? Yes ❑ No 0
PBU B -36A
9. Property Designation (Lease Number):
10. Field/Pools:
ADL 028310 & 028309
PRUDHOE BAY. PRUDHOE '
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft):
Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD:
MPSP (psi): Plugs (MD):
Junk (MD):
13702
8853 13668 8866
None
None
Casing
Length Size MD TV Burst
Collapse
Structural
Conductor
78 20" 36-114 36 - 114 1490
470
Surface
3613 9-5/8" 36-3649 38 - 3339
5750
3090
Intermediate
10790 7" 33-10823 33 - 8606 7240/8160
5410/7020
Liner
838 4-1/2" 10614-11 55 8452 - 8932 8430
7500
Liner
2804 3 -1112"x3 -1/4"x2-7/8" 98 - 1 02 8658 - 8853
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing e:
Tubing Grade:
Tubing MD (ft):
13553 - 13573
8910 - 8903
/
12.6rt
13Cr80 / L-80
31 -10620
Packers and SSSV Type: 4-1/2" Baer S-3 Packer /
Packers and SSSV MD (ft) and TVD (11 103831
4412" Baker S-3 Packer
I /
105641
12. Attachments: Proposal Summary 0 Wellbore"S to
13. Well Class after Proposed work:
Detailed Operations Program ❑ ketc
Exploratory ❑ Stratigraphic ❑ Development 0 Service ❑
14. Estimated Date for Commencing Operations: March 019
15. Well Status after proposed work:
Oil 0 WINJ ❑ WDSPL ❑ Suspended ❑
16. Verbal Approval: Dater
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
Commission Representative:
GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. 1 hereby certify that the foregoing is true and th procedure approved herein will not Contact Name: O'connor, Katherine
be deviated from without prior written approval.
Contact Email: Katherne.O'connor0 p.00m
Authorized Name: O'cennor, Katherine
Contact Phone: +1 8075644640
Authorized Title: Integrity & Interval4tions Engineer
Authorized Signature: Date: ZI l j j 9
COMMISSION USE ONLY
alon so that a representative may witness Sundry Number: h `�
U(�✓
Conditions of apXired?
Plug Integrity Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑
Other:
Post Initial Injects ❑ No [I
Spacing Exceptis ❑ No (7 Subsequent Form Required: IC -10L4
APPROVED BYTHE
Approved by: COMMISSIONER COMMISSION Date:
ORIGINAL RBDMS3ZFEB 2 0 1019
#L" 11 resmr Submit Fo- rm and
Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. Attachm is in Duplicate
/ Z f5 -/j•
by
la^
k*j Well: B-36
B-36 OA WeIlLock Squeeze
Well Interventions Engineer: Katherine O'Connor (907) 564-4640
Pad Engineer: Wade Boman (907) 564-4674
Expected Start Date: March 1, 2019
History
B-36 is a naturally producing well. In 2008 a RWO cut & pulled the PC and cemented the OA to repair
a surface casing leak. The well was on a on/off production cycle, and the last time the well was "on"
(Nove 2018 — Jan 2019) there was rapid OA repressurization. This well was monitored for
repressurization trends, and on 2/3/2019 the well was put under evaluation with T/I/O of 2130/290/790
psi. The well passed PPPOT-T and PPPOT-IC tests, indicating the communication is not through the
well head. The plan forward is to complete a WeIlLock treatment — squeezing the WeIlLock into the
cemented OA to mitigate repressurization. Pending a successful squeeze, the well can be brought
back to operable status.
Current Status
The well is currently under evaluation and will be soon shut-in and classified as "Not Operable" by
BP.
Objective
Squeeze the cemented OA with Well Lock to seal off the OA re -pressurization.
Procedure
1. ND OA Gate Valve, NU OA Integral,
2. Bleed Annuli, Prep OA, WeIlLock OA top job squeeze to 2500 psi per RPs.
3. E EV a
78.91'
I TVDI
MV
I TYPE I
vLV
ELEV -
43.23'
647E
20' GOND,
'
1250'
43
KG62
Angle=
1146 A 13607
16
D- 19 124'
=MD=
11396'
5706
42
infiVD-:
- --eaov ss
BK
asm• RG 4W, L-tU RR:, XI=A 835' 1-I 3949•
Taco. car. L-tW OTaµo cs; c^ 9770
Minimum ID =2.3, 10900'
HES X NIP IN LTP wIPTSA
6 NE BEAR .0152 bpi, D - 3.938'
ra-irr TBG. t2.88. L-80, .0toz i,rr, u-p.>tae� - i
LNFL 9.39. 13CR#9 STL. 0087 bp/. 11) 92• 111{1•
4-177 LF81, 12.81, 13CR NSCT,
0152 bpi. D = 3.953'
it#(X^W IKM 5tRAMANT
HLF LOG: ON _f_ f_
AN2.EATTOPPUF 111'01355Y
RTL. Bose W, 1)=244V
SAFETY NOTES: WELL ANGLE> 701 @ 11415'...
CHROME
B -36A g
$Qaj' ]-j4t2'IfsxPp.D^3.Et3-
43 6 CEAYIB4
Vrxra a-,Rw
r,A51 FT VAWIR 1 S
ST
I UD
I TVDI
MV
I TYPE I
vLV
I LATCH
RTF
647E
4
3804
3452
43
KG62
DOME
BK
16
03/16117
3
6909
5706
42
KG92
DOME
BK
16
03/18117
2
8942
1
72DD
42
KOW
0647
BK
0
1
091101
100M
881195
41
KGB2
DW
BK
0
0011588
-11
1�� 7' % 4-112" BKR 5-3 PKR D a 1.870'
r x 412-
1066{• -(r X 4-.I/2• RKR 5-3 MR D = 5-875'
10917' 1-�4-In'r+rSXrv, ma 387 ]•�
10608' H412'MES XN FJP MBL®703.80'0
10914' +o•TNYT8RA0<sLv,o-stat'
1fAIN ,--�4'IIL-YYLtIi. Ua D.`J.70J
10639' �L3AU 1-f LOGC�O6i1G19E...
'� 1� T•Y4ttl'TMII TP Az3915
HYDRD HOP, D =1515 -
KB RKR LIP w IPFSA. D = 2.44• (0821
'0.13KR OEFLOf MDR SLV. D+3.00'
112^ X NP, D= 2-813-
112• X 1918' XO, D - 2.166'
MLLOUT WFWW (B -38A) 11 S50'- I I500' 1
1931' 13n6 X tam- xo. D • z 37r
DATE
fiV BY OOFR.Bm
64TE
FEV BY COPA NM
05MMS
5273E ORKDAL COM PLET10N
0522!17
J JJMD AWED BF 9 H4.' ELEV
llw"s
019 FMIO
07103(17
JMD DPLG HD OOF7d*IMNS.
owilse
DIG )MID
07105117
10aW17
FCIJMD FMLODEARii7VAL
07101117
NCDRZ CTDSN MCK(&36A)
07/10117
J AU AOFERFS(07105117)
06108117
JMD BIILT FF40POSM
B13FJJAD SFT UP IPTSA B X NP (0&2&17
0529'17 JIMJUD MLLeDxN NPl SET WS w0P TAG
RIDR)E BAY Ulf
WELL B -36A
PEFUT P* 217-073
AM N0: 50-029.22867.01
STD 31, TI IK RUE 529' FHL 8 1894' FE_
BP BlploraHom (Aba9kal
Rixse, Melvin G (DOA)
From: Rixse, Melvin G (DOA)
Sent: Tuesday, February 19, 2019 3:07 PM
To: 'O'Connor, Katherine'
Cc: Guy L Schwartz (DOA) (guy.schwartz@alaska.gov)
Subject: RE: PTD 217-073, Sundry 319-059 - PBU B -36A
Katherine,
Sundry request #319-059 is currently denied. AGOCC will require recent TIO plots, an OA injectivity test, and
another MIT -IA (or CMIT TxIA) before placing well lock in the OA in a manner that could mask communication to the OA
(surface and/or shoe) from the IA.
Mel Rixse
Senior Petroleum Engineer (PE)
Alaska Oil and Gas Conservation Commission
907-793-1231 Office
907-223-3605 Cell
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),
State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or
disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it,
and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231) or (Melvin.Rixse(&alaska.eov).
cc. Guy Schwartz
From: O'Connor, Katherine <Katherine.O'connor@bp.com>
Sent: Monday, February 11, 2019 11:05 AM
To: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov>
Subject: RE: PTD 217-073, Sundry 319-059 - PBU B -36A
Hi Mel,
In March 2017 the well had a passing MIT -T and CMIT-TxIA. The IA is not fluid packed. The fluid level is at the Station 3
Dome valve.
Thanks,
Katherine O'Connor
Interventions & Integrity Engineer
Phone: 907-564-4640
Mobile: 214-684-7400
katherine.o'connor@bn.com
From: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov>
Sent: Monday, February 11, 2019 9:19 AM
To: O'Connor, Katherine <Katherine.O'connor@bp.com>
Subject: PTD 217-073, Sundry 319-059 - PBU B -36A
Katherine,
DATA SUBMITTAL COMPLIANCE REPORT
10/5/2017
Permit to Drill 2170730 Well Name/No. PRUDHOE BAY UNIT B -36A
MD 13702 TVD 8853 Completion Date 7/6/2017
REQUIRED INFORMATION /
Mud Log No
DATA INFORMATION
Types Electric or Other Logs Run: MWD/GR/RES t P—PK
Well Log Information:
Log/ Electr
Operator BP EXPLORATION (ALASKA) INC. API No. 50-029.22667-01-00
Completion Status/ 1 -OIL Current Status 1 -OIL UIC No
Samples No Directional Survey Yes✓
Data Digital Dataset Log Log Run
Type Med/Frmt Number Name Scale Media No
ED C 28413 Digital Data
ED C
ED C
ED C
ED C
ED C
ED C
ED C
ED C
ED C
ED C
ED C
28413 Digital Data
28413 Digital Data
28413 Digital Data
28413 Digital Data
28413 Digital Data
28413 Digital Data
28413 Digital Data
28413 Digital Data
28413 Digital Data
28413 Digital Data
28413 Digital Data
(data taken from Logs Portion of Master Well Data Maint)
Interval OH /
Start Stop CH Received
Comments
10808 13702 7/25/2017
Electronic Data Set, Filename: B-
36A_LWD FINAL FIELD_COMPOSITE_27JUN2
017_ BHI_CTK.Ias
7/25/2017
Electronic File: 10435175 1-7-20171.pdf ,
7/25/2017
Electronic File: 12914857 3-29-2017x.pdf -
7/25/2017
Electronic File: B -36A Pre Run 03 USR
10435175.pdf
7/25/2017
Electronic File: B -36A Pre Run 04 USR
12914857 airhang.pdf
7/25/2017
Electronic File: B-
36A_GR_Res 27JUN2017_MD_FINAL_FIELD_B -
HI_CTK.cgm
7/25/2017
Electronic File: B -
36A GR_ Res_ 27JUN2017_TVDSS_FINAL_FIEL -
D_BHI_CTK.cgm
7/25/2017
Electronic File: B-
p
36A_GR_Res_27JUN2017_MD_FINAL_FIELD_B
HI_CTK.pdf
7/25/2017
Electronic File: B -
V2
36A_GR_Res_27JUN2017_TVDSS_FINAL_FIEL-
D_BHI_CTK.pdf
7/25/2017
Electronic File: B -36A Final Survey Report.pdf. ,
7/25/2017
Electronic File: B -36A Final Survey Report.txt .
7/25/2017
Electronic File: B -36A Final Surveys TO
13702.csv
AOGCC Page I of 3 Thursday, October 5, 2017
DATA SUBMITTAL COMPLIANCE REPORT
10/5/2017
Permit to Drill 2170730 Well Name/No. PRUDHOE BAY UNIT B -36A
MD 13702
ED C
ED C
ED C
ED C
ED C
TVD 8853
28413 Digital Data
28413 Digital Data
28413 Digital Data
28413 Digital Data
28413 Digital Data
Completion Date 7/6/2017
ED C 28413 Digital Data
Log C 28413 Log Header Scans
ED C 28471 Digital Data
ED
C
28471
Digital Data
ED
C
28471
Digital Data
ED
C
28471
Digital Data
ED
C
28471
Digital Data
ED C 28471 Digital Data
Log C 28471 Log Header Scans
Well Cores/Samples Information:
Name
Operator BP EXPLORATION (ALASKA) INC.
Completion Status 1 -OIL
0 0
10210 13671
11346 11589
0 0
Interval
Start Stop Sent Received
API No. 50-029-22667-01-00
Current Status 1 -OIL UIC No
7/25/2017 Electronic File: B -36A Final Surveys TO ..
AOGCC Page 2 of 3 Thursday, October 5, 2017
13702.x1sx
7/25/2017
Electronic File: B-36A_25_tapescan_BHI _CTK.txt -
7/25/2017
Electronic File: B-36A_5_tapescan_BHI _CTK.txt-
7/25/2017
Electronic File: B-36A_output.tap
7/25/2017
Electronic File: B-
36A_GR_Res _ 27JUN2017_MD_FINAL_FIELD_B .
HI_CTK.tif
7/25/2017
Electronic File: B-
36A_GR_Res _ 27JUN2017_TVDSS_FINAL_FIEL
D_BHI_CTK.tif
2170730 PRUDHOE BAY UNIT B -36A LOG
HEADERS
8/8/2017
Electronic Data Set, Filename: B-
36A_MRPM_ PNC3D_RAW_PASS0IUP_5JUL20 ,
17_BHl.las
8/8/2017
Electronic Data Set, Filename: B -
36A_ MRPM_ PNC3D_RAW_PASS02UP_5JUL20 '
17 6Hl.las
8/8/2017
Electronic File: B-
36A_MRPM_PNC3D_RAW _5JU L2017_BH I. meta
Electronic File: B-
p8/8/2017
T
36A_ MRPM_PNC3D_RAW_5JUL2017_BHI.PDF'
8/8/2017
Electronic File: B-
36A_MRPM PNC3D_RAW_PASS0IUP_5JUL20
17 BHI.dlis
8/8/2017
Electronic File: B -
36A_ MM
RP_ PNC3D_RAW_PASS02UP_5JUL20 -
17 BHI.dlis
2170730 PRUDHOE BAY UNIT B -36A LOG
HEADERS
Sample
Set
Number
Comments
AOGCC Page 2 of 3 Thursday, October 5, 2017
DATA SUBMITTAL COMPLIANCE REPORT
10/5/2017
Permit to Drill 2170730 Well Name/No. PRUDHOE BAY UNIT B -36A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-22667-01-00
MD 13702 TVD 8853 Completion Date 7/6/2017 Completion Status 1-0I1- Current Status 1 -OIL UIC No
INFORMATION RECEIVED
Completion Report Directional / Inclination Data YY Mud Logs, Image Files, Digital Data
/YY�' l.% Core Chips Y
Production Test Informatior®Y NA Mechanical Integrity Test Informatio5Y,
Composite Logs, Image, Data Files') Core Photographs Y (j�111
Geologic Markers/TopsJ Daily Operations Summary Cuttings Samples Y Laboratory Analyses Y ! A
COMPLIANCE HISTORY
Completion Date: 7/6/2017
Release Date: 6/1/2017
Description Date
Comments:
Compliance
Comments
Date:/ D [ S /(
AOGCC Page 3 of 3 Thursday, October 5, 2017
STATE OF ALASKA j
ALASKA OIL AND GAS CONSERVATION COMM, ,ION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed
Abandon ❑ Plug Perforations Cl Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Reenter Susp Well ❑ Other. Set Liner Top Packer
2. Operator Name: BP Exploration (Alaska), Inc
4. Well Class Before Work
Development m Exploratory ❑
5. Permit to Dnll Number: 217-073
3. Address: P.O. Box 196612 Anchorage,
AK 99519-6612
Stratigraphic ❑ Service ❑
8. API Number: 50-029-2266701-00
7. Property Designation (Lease Number): ADL 0028310
8. Well Name and Number PBU B -36A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools:
PRUDHOE BAY, PRUDHOE OIL
11. Present Well Condition Summary: REC1111M
Total Depth: measured 13702 feet Plugs measured feet
SEP 2 5
true vertical 8853 feet Junk measured feel 2011
Effective Depth: measured 13888 feet Packer measured See Attaatment feet
�q{�/'�)'^'+^_
true vertical 8866 feet Packer true vertical See Attachment feet ^ ""��^ C
Casing: Length: Size: MD: ND: Burst: Collapse:
Structural
Conductor 78 20" 91.5# H40 36-114 36-114 1490 470
Surface 3613 9-5/8" 40# L-80 36-3649 36-3339 5750 3090
Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Production
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation Depth: Measured depth: 13553 - 13573 feet
True vertical depth: 8910 - 8903 feet feet
Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment
Packers and SSSV (type, measured and See Attachment See Attachment See Attachment
true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
945
33531
0
1520
986
Subsequent to operation:
Shut -In
1280
240
14. Attachments: I.q.,.a per 20 MC 25D70 25,071, a 25.2831
15. Well Class after work:
Daily Report of Well Operations R1
Exploratory ❑ Development ® Service ❑ Stmtigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work: Oil ® Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑ IGSTOR
❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17, 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or WA if C.O. Exempt:
N/A
Authorized Name: Boman, Wade Contact Name: Boman, Wade
Authorized Title: Production Engineer, B&X pads Contact Email: Wade.BOman@bp.com
Authorized Signature: ( �,! A„np� Date: -��_ 2� -� Contact Phone: +1 9075644674
Form 10404 Revised 04/2017ISA ` I `� RBDMS ` moo` i -
3 2017 Submit Original Only
Alaska Oil and Gas Conservation Commission
333 West Seventh Avenue
Anchorage, AK 99501-3572
RE: BP Exploration (Alaska), Inc.
Report of Sundry Well Operations Summary
September 21, 2017
To Whom it May Concern:
DECEIVED
SEP 2 5 2017
Attached please find the Report of Sundry Well Operations for Setting of a Liner Top
Packer for Well B -36A, PTD # 217-073.
Sincerely,
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Attachment: Form 10-404
BP Exploration (Alaska) , Inc.
P.O. Box 196612 Anchorage, AK 99519-6612
Packers and SSV's Attachment
PBU B -36A
SW Name
Type
MD TVD Depscription
B -36A
TBG PACKER
10382.52 8281.15 4-1/2" Baker S-3 Perm Packer
B -36A
TBG PACKER
10563.65 8414.51 4-1/2" Baker S-3 Perm Packer
B -36A
PACKER
10882 8647.79 3-1/2" Baker 45 KB Packer
Casing / Tubing Attachment
PBU B-36A
Casing
Length
Size MD
TVD
Burst
Collapse
CONDUCTOR
78
20" 91.5# H-40 36
114
36
114
1490
470
SURFACE
3613
9-5/8" 40# L-80 36
3649
36
3339
5750
3090
INTERMEDIATE
32237'
26# L-80 33
3256
33
3051
7240
5410
INTERMEDIATE
6485
7" 26# L-80 3250
9735
3047
7799
7240
5410
INTERMEDIATE
1088
7" 29# 13CR80 9735 -
10823
7799
8606
8160
7020
LINER
650
3-1/2" 9.3# 13Cr85 10898 -
11548
8658
8931
10160
10530
LINER
1199
3-1/4" 6.6# 13Cr85 11548 -
12747
8931
9043
TUBING10506
4-1/2" 12.6# 13Cr80 31 -
10536
31
8394
8430
1 7500
TUBING
89
4-1/2" 12.6# L-80 10532 -
10620
8391
8456
8430
7500
Daily Report of Well Operations
PBU B -36A
ACTIVITYDATE
SUMMARY
***WELL SHUT IN ON ARRIVAL*** (Post CTD)
RU SWCP 4518 TO SET LTP
8/25/2017
***CONT. ON 08/26/17 WSR***
T/1/0=2300/1800/200 Temp=Sl (LRS Unit 72 - Assist Slickline: Liner Top Packer) Pumped 2 bbls
8/25/2017
50/50 meth and 10 bbls crude down Tbg to start load ***Job Cont to 08-26-2017 WSR***
***WELL FOUND S/I ON ARRIVAL*** (Post CTD)
DRIFT TO DEVIATION W/ 2.25" CENT, 1.75" S. BAILER @ 11790' SLM
RAN BP TANDEM SBHPS GAUGES ACCORDING TO PROGRAM
8/26/2017
***WELL LEFT SHUT IN, PAD -OP NOTIFIED***
***CONT. FROM 08/25/17 WSR*** (Post CTD)
RAN DUMMY LTP TO DEPLOYMENT SLV AT 10858' SLM, SET W/ LRS ASSIST.
SET LTP IN DEPLOYMENT SLV @ 10861' SLM W/ LRS ASSIST.
(OAL= 22', top of LTP @ 10882' md, 2.31" x -nip @ 10900' md)
LRS PERFORM PASSING MIT -T TO 2160 PSI.
PULL 2-7/8" XX PLUG FROM LTP AT 10862' SLM.
8/26/2017
***JOB COMPLETE***
***Job Cont from 08-25-2017 WSR*** (LRS Unit 72 -Assist Slickline: Load & Test)
Pumped 170 bbls crude (180 total) down Tbg for load.
Pumped 58 bbls crude down Tbg for injectivity test. Got -4.5 bpm at 2000 psi for injectivity test.
Pumped 9 bbls at 2bpm while Stine set drift plug.
Pumped 39 bbls crude down Tbg for injectivity test after SLine set drift plug. Got an injectivity of 2.5
bpm @ 2050 psi. S -Line Set LTTP,
MIT -T ***PASSED*** to 2233 psi. Max Applied = 2400 psi. Target = 2160 psi. Loss of 92 psi 1st
15 min, Loss of 25 psi 2nd 15 min. Bled down To 750. Pumped 5.9 bbls crude down Tbg to reach
test pressure.
S -Line on location upon departure
8/26/2017
FWHP=750/1290/200
Fluids Summary
Bbls Type
2 50/50 Methanol/Water
342 Crude
3 Diesel
3==
-L AD= RLC
RJATOR =
3. ELEV = 76.91'
ELEV = 76.91'
ELEV = 43.23' 20" COPD. 110'
= 1250'
Angle = 114" OM 13607 D - 19.124'
im AD= 11396'
Im TVD= saw. SSI
7• CSG, 26#, L -BO BTC, D = 6.276" 3244'
9-5/8" CSG, 40#, L-80 BTC, D = 8.835' 3649'
T CSG, 26#, L-60 HTGM. D= 6.276' - 9736
Minimum ID = 2.31" @ 10900'
HES X NIP IN LTP w/PTSA
4-12' TBG, 12.6#, 13CR-80 VAM TOP 10512'
8 JFE BEAR, .0152 bpf, D = 3.958'
4-1/2"
4-1/2• LNR J1 10614-
D = 2.992•
1
-UKKW w/RAUDACTNE PP TAG (06/09117) —f 1161
RR(AHOE BAY II IT
WELL: B -36A
PEATT Pb: 217-073
AR No: 50-029-22667-01
SEC 31, Tl lN, R14F- 529' FNL 8 1894' FEL
4-1/2' LNR, 12.6#, 13CR NSCT,
.0152 bpf, D = 3.953"
—115
kU
TVD
LNR 6.60, 13CR-85 TCS .0079 bpf, D = 2.850'1193
PERFORATION SIAWARY
REF LOG. ON _/ 1
ANGLE AT TOP PERF: 111' @ 13553'
Note: Refer to production DB for historical perf data
SIZE
I SPF
I MERVAL
I Opn/Sgz
I SHOT
SOZ
2-
112-7/8• LNR
PBTD 13666'
.441• 13702'
. ETY NOTES: WELL ANGLE> 70' @ 11495'***
B -313A
CHROME TBG, CSG & LINER`••MAX DLS: 26.8'
11741'.
2086' 4-1/2• HES X NP, D = 3.813•
3193' 7• HES Es CB.�ns2
3206' 9-5/8• X 7.13KR EG PKR
GAS LFT MANDRELS
10374' I—j7" X 4-12' BKR S-3 PKR D = 3.870'
X 4-12' UJDLIE OV ERSH0T
12-FESX NP,D=3.813'
X 4-12' BKR S-3 R(R D = 3.875"
12•HES XNP, D=3.813"
3.80'
10' TMVTE-BACK SLV
I-12' WLEG. D = 3.951
X 4-12' TNV DOV E TAL
'DRO FIGR,
I BKR LTP w /PBA, D = 2.44'
0898' 1-13.70' BKR DEPLOYMENT SLV, D = 3.00'
0800' HES X NP, D = 2.31'
0920' 3-12• X NP, D = 2.813'
1648' 3-12' X 33/16' XO, D = 2.786'
MLLOUT WNDOW (B -36A) 11550'- 11560'
1931' 3-3/16' X 2-7/8' XO, D = 2.377'
2747' PLAJTw/RATAG
RR(AHOE BAY II IT
WELL: B -36A
PEATT Pb: 217-073
AR No: 50-029-22667-01
SEC 31, Tl lN, R14F- 529' FNL 8 1894' FEL
DATE REV BY COM. NTS
DATE REV BY COMu NTS
kU
TVD
DEV
TYPE
VLV
LATCH
PORT
DATE
06/08/17 JM) BUILT PROPOSED
I—F2
BP Exploration (Alaska)
3804
6909
8942
10266
3452
5706
72(19
8196
43
42
42
41
KGB2
KGB2
KG62
KG82
DOMEJ
DOW
DA1Y
DAM
BK
BK
BK
BK
16
16
0
0
JWV16�17
0311
0911
09110108
10374' I—j7" X 4-12' BKR S-3 PKR D = 3.870'
X 4-12' UJDLIE OV ERSH0T
12-FESX NP,D=3.813'
X 4-12' BKR S-3 R(R D = 3.875"
12•HES XNP, D=3.813"
3.80'
10' TMVTE-BACK SLV
I-12' WLEG. D = 3.951
X 4-12' TNV DOV E TAL
'DRO FIGR,
I BKR LTP w /PBA, D = 2.44'
0898' 1-13.70' BKR DEPLOYMENT SLV, D = 3.00'
0800' HES X NP, D = 2.31'
0920' 3-12• X NP, D = 2.813'
1648' 3-12' X 33/16' XO, D = 2.786'
MLLOUT WNDOW (B -36A) 11550'- 11560'
1931' 3-3/16' X 2-7/8' XO, D = 2.377'
2747' PLAJTw/RATAG
RR(AHOE BAY II IT
WELL: B -36A
PEATT Pb: 217-073
AR No: 50-029-22667-01
SEC 31, Tl lN, R14F- 529' FNL 8 1894' FEL
DATE REV BY COM. NTS
DATE REV BY COMu NTS
05122196 N28E ORIGINAL COMPLETION
062V17 JNJJAD AOO® BF 8 REF ELEV
09104/06 D16 RWO
07/03/17 JAD ORLG HD CORRECTIONS
09/1'1108 D16 RWO
07/05/17 RdJArD FINAL ODE APPROVAL
07101117 N-COR2 CTD SIDETRACK(B-36A)
07110117 JCIJAD ADPE RFS (07106/17)
06/08/17 JM) BUILT PROPOSED
08/30/17 BSEIJMD SET LTPw IPTSA 8 X NIP (08/26117)
BP Exploration (Alaska)
06/22/17 JTMJMJ ALL® XN NP 8 SET WS w /RP TAG
BA ER %' PRINT DISTRIBUTION LIST
ily limb
a GE company
COMPANY BP Exploration Alaska 1
WELL NAME B -36A V
FIELD Prudhoe Bay Unit AUG 0 8 2017
21 7073
28471
se sign and return one copy of this transmittal form to:
Exploration (Alaska) Inc.
rotechnical Data Center, LR2-1 DATA
L % oGE
I E. Benson Blvd. M. K. SENDEr
:horage, Alaska 99508
COUNTY PRUDHOE BAY nnGCC LOGTYPE RPM:PNC3D
BHI DISTRICT Alaska
AUTHORIZED BY Paul Canizares
EMAIL Paul Canizares(a)bakerhuohes.com
LOG DATE July 5, 2017
TODAYS DATE August 6, 2017
Revision
STATUS Final Replacement: No Details:
Rev. Requested by: ---
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
V
1 1 BP North Slope.
:EOA, PROC, PRB-20 (Office 109)
D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 IIConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 3-344
700 G Street
Anchorage, AK 99510
3 ExxonMobil, Alaska
Attn: Lynda M. Yaskell andror Lisa Boggs
3201 C Street, Suite 505
Anchorage, AK 99503
4. State of Alaska - AOGCC
Attn: Makana Bender
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
51DNR - Division ofOil & Gas *"
Attn: James Hyun
550 West 7th Avenue, Suite 802
'Anchorage, Alaska 99501
i""-• Stamp "confidential' on all material deliver to DNR'
FIELD I
FINAL
CD/DVDFINAL
PRELIM
(las, dlis, PDF, META,
SURVEY
REPORT
LOGS
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTS
# OF COPIES
# OF COPIES
# OF COPIES
9 lu 4 4 1;
0 10 1 1 1 0 10
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, aR2-1
900 E. Benson Blvd
Anchorage, Alaska 99508
Attn: Gerardo Cedillo
TOTALS FOR THIS PAGE
0 2 5 0 0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMS -)N
WEL_ .;OMPLETION OR RECOMPLETION REPti AND LOG
1a. Well Status: Oil m Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
Well Class:
20AAC 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One
11b.
Development 0 Exploratory ❑
Service ❑ Stretigrephic Test ❑
2. Operator Name:
6. Date Comp., Susp., or Abend.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
7/6/2017
217-073-
17-073-3.
3-Address:
7. Dale Spudded:
15. API Number:
P.O. Box 196612 Anchorage, AK 99519-6612
6/21/2017
50-029-22667-01-00,
4a. Location of Well (Governmental Section):
S. Date TD Reached:
16, Well Name and Number:
6/26/2017 •
PBU B -36A •
9 Ref Elevations KB 76.91
17. Field/Pool(s):
Surface: 4751' FSL, 1894' FEL, Seo. 31, TI IN, R14E, UM •
Top of Productive Interval: 485' FSL, 4441' FWL, Sec. 29, T71 N, R14E, UM
GL 41.33 . BF 43.23
PRUDHOE BAY, PRUDHOE OIL
10. Plug Back Depth(MD/TVD):
18. Property Designation:
Total Depth: 1882' FSL, 896' FWL, Sec. 28, T11 N, R14E, UM
• 13666'/ 8866' -
ADL 028310 & 028309 '
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11. Total Depth (MD/TVD):
19. DNR Approval Number:
Surface: x- 663734 • y- 5950115 Zone - ASP 4
• 13702'/ 8853' •
89.034
TPI: x- 670042 y- 5951269 Zone - ASP 4
12. SSSV Depth (MO/TVD):
20Thickness of Pennafmat MDTVD:
Total Depth: x- 671746 y- 5952485 Zone - ASP 4
None
1900' (Appmx.)
5. Directional or Inclination Survey: Yes RI (attached) No ❑
13. Water Depth, 1 Offshore:
21. RedrilBLatend Tap Window
MD/TVD:
Submit electronic and printed information per 20 AAC 25.050
N/A (ft MSL)
- 11550'/ 8932' -
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma my, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MWD/GR/RES
23' CASING, LINER AND CEMENTING RECORD
CASING Wr. PER GRADE
FT.
SETTING DEPTH MD SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
AMOUNT
PULLED
TOP BOTTOM TOP BOTTOM
20" 91.5# H40
36' 114' 36 114'
30"
260 sx Arctic Set (Approx.)
9-5/8" 60# Lda
36' 3649' 36' 333W
12-1/4"
1375 sx CS III, 335 ax Class'G'. 300 sx CS 11
7" 26#/29# LawlXft
33' 10823' 33' 8606'
8-112"
225 sx Class'G
4-1/2" 12.6# 13CM
10614' 11550' 8452' 8932'
6"
236 sx C4ws'G'
-1/2"x3-1/4" 9.3#/6.6 13OW
10898' 13702' 8658' 8853'
1 4-1/4'
137 sx Class'G'
x2-7/8" /6.5#
24. Open to production or injection? Yes ® No ❑
25. TUBING RECORD
If Yes, list each interval open (MDRVD of Top and Bottom; Perforation
Size and Number):
GRADE DEPTH SET (MD) PACKER SET (MD/FV
4-1/2" 12.6# 13Cr80/L-BD 10620' 10383' / 8282'
2" Gun Diameter, 6 spf
10564-18415-
0564'/8415'13553'-13573'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
13553'- 13573'8910'- 8903'
E C E i V E C
Was hydraulic fracturing used during completion? Yes ❑ No ® •
Per AAC 25.283 (i)(2) attach electronic and printed
information
DATE
DEPTHINTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED
11 ti) i, AUG 0 3 2011
VERIFIED
2500' Freeze Protect w/ 40 Bbls Diesel
' AOGCC
27. PRODUCTION TEST
Date First Production: July 8, 2017
Method of Operation (Flowing, gas lift, etc.): Flowing
Date of Test: 7/9/2017
Hours Tested:
Production for
Oil -Bbl'
Gas -MCF:
Water -Bbl:
Choke Size:
Galtl Ratio:
4
Test Penod -11-321
4403
0
96
13710
Flow Tubing 980
Press
Casing Press:
1240
Calculated
24 Hour Rate --w
Oil -Bbl:
1927
Gas -MCF:
1 26415
Water -BN:
0
Oil Gravity- API (oxr):
WA
Farm 10.407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only
8 2017
RBDMS '-� All"
28. CORE DATA 1 Conventional Core(s) Yes ❑ No ® .i Sidewall Cores Yes ❑ No 0
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology, and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS
NAME
MD
TVD
Permafrost -Top
Well Tested? Yes ❑ No
Permafrost - Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
11343'
8855separate sheets to this form, if needed, and submit detailed test Information per 20
AAC 25.071.
CGL-Zone 3
11178'
8788'
Base of CGL - Zone 2C
11343'
8855'
23SB - Zone 2B
11472'
8907'
Kicked off from Parent Well B-36
11550'
8932'
22TS
11670'
8980'
21TS-Zone 2A
11803'
9039'
22TS (Invert)
13196'
9026'
23SB - Zone 2B
13392'
8965'
Base of CGL - Zone 2C
13553'
8910'
Formation at total depth:
Zone 2C (From Base)
13553' 1
8910'
31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post-Rig Work, Survey, Cement Report, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Ciolkosz, Ryan R
Authorized Tifle: Info at n and DWa ont er Contact Email: Ryan.Ciolkosz@bp.com
Authorized Signature: te: ib Contact Phone: +1907 564 5977
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10407 well completion report and 10404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item Ia. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this forth and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in Item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well lest results.
Form 10407 Revised 5/2017 Submit ORIGINAL Only
TREE=
_
RNC
WELLHEAD =
ACTUATOR=
VLV
LATCH
OKB. ELEV =
76.91'
4
REF ELS/ =
76.91'
KGB2
BF. ELEV =
43.23'
16
20' COND.
KOP=
1250'
5706 42
91.571, H.40,
Max Angle =
114'@ 136OZ
16
03/16/17
2
8942
7209 42
D= 19.124'
Datum MD =
11396'
0
09/10/08
Datum TVD =
8". SS]
81961 41 1
KG82
T CSG, 260, L-80 BTC. D = 6.276'
BK
9-5/8' CSC, 400. L-80 BTC. D = 8.835'
7' CSG, 260, L-80 BTC -M. D= 6.276'
1 3244' 1
Minimum ID = 2.377" @ 11931'
33/16" X 2-7/8" XO
4-12' TBG, 12.60, 13CR-80 VAM TOP
8 JFE BEAR, .0152 bpf, D = 3.958'
41/2' TBG STUB (09/09/081
7- CSG, 290,
1 10512' 1
13-1/2' X 3-1/4'X 2-78' TOU TOC I
41/2' LNR, 12 .60, 13CR NSCT, 111550'
.0152 bpf, D = 3.953'
LNR 6.6#, 13CR-85 TCI, .0079 bpf, D = 2.850' 11931'
PEWORATI IN SUMIMRY
MF LOG: ON
ANGLE AT TOP FEtiF: 111' @ 13553'
Note: Refer to Production DB for historical perf data
S¢E SPF Kn3WAL Opn/Sgz SHOTI SOZ
3
2-7/e' LNR 6.5#. 13CR-66 STL, .0058 bpf, D = 2.441'
TY NOTESWELL 70- *
C1TBG,CSGSLINER***MAXDLS:26-8°B-36A 11741'.
•'
2086' 4-12' FES X NP, D = 3.813'
3183' 7' HFS EF CBr1B7TH2
GAS LFT MAN7fa=LS
ST
MJ
TVD DB/
TYPE
VLV
LATCH
PORT
DATE
4
3804
3452 43
KGB2
DOME
BK
16
03/16/17
3
6909
5706 42
KGB2
DOME
BK
16
03/16/17
2
8942
7209 42
KGB2
DW
BK
0
09/10/08
1
10266
81961 41 1
KG82
Dbfl' 11
BK
0
09/10/08
FESX NP. D=3.813'
17' X 4-1/2' BKR S-3 PKR D= 3.870' 1
4-12' UNIQUE OV ERSFDT
2'FESXNP,D=3.813'
14-12' HES X NP. D = 3.813' 1
•1 10614'—j10'TIWTEBACKSLV,1D=5.241'
REV BY
10620'
4-12-WLEG, D=3.958'
10629'
ELMD TT LOGGED 06/16/96
10-62�
7-X4-12'Tw LTP. D=3.861'
I HYDRO HGR. D=3.915' I
3.70' BKR DEPLOY MBNT SLV, D = 3.00'
n�-1rv< nr.a�o nv,u=ciao- I
MLLOUT WINDOW (B -36A) 11550'- 11560'
1231,l -43 -3/i6 -X2 -718 -XO . 113=2377-
DATE
=2377'
DATE
REV BY
COMM6411'S
LATE
REV BY
COMP NTS
05122196
N28E
ORIGINAL COMPLETION
06/22/17
JN /JMJ ADO® BF B REF ELEV
09/04/06
016
RWO
07/03/17
JMJ
DRLG HO CORMIMNS
09/11/08
Dib
RWO
07/05/17
RCUM3
FWLODEAPPROVAL
07/01/17
N-CDR2
CTD SIDETRACK (B -36A)
07/10/17
JCJJMJ
ADPWS(07/06/17)
06/08/17
JM)
BUILT PROPOSED
06/22/17
JTMJMJ MLLED XN NP 8 SET WS w /PP TAG
PRUDHDE BAY UNIT
WELL: B36A
P9iMT No: 217-073
AR No: 50.029-22667-01
SEC 31, T11 N R14E 529 FN- 8 1894' FEL
BP Exploration (Alaska)
Printed 822017 4:06:37PM 'All depths reported in Drillers Depths'
North America - ALASKA
- BP
Page 1 or 12
Operation Summary Report
Common Well Name: B-36
AFE No
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 61192017 End Date:
X3-018HL-C:(2,576,514.00)
Project: Prudhoe Bay
Site: PB B Pad
Rig Name/No.: CDR-2
Spud Date/Tme: 4/30/1996 12:00:OOAM
Rig Release:
Rig Contractor. NABORS ALASKA DRILLING INC.
BPUOI: USA00000626
Active datum: KB @76.91 usft (above
Mean Sea Level)
Date
From- To
Him
Task
Code
NPT
Total Depth
Phase
Description of Operations
hr
usft
6/192017
1600 -
19:15
3.25
DEMOB
P
PRE
RELEASE RIG OFF C-11 B, FINISH RIG DOWN,
MOVE RIG TO B-PAD
19:15 -
22:15
3.00
DEMOB
P
PRE
ARRIVE B-PAD
VERIFY VALVES CLOSED AND PRESSURE
BELOW 50 PSI.
12 x 12 CHOCK BLOCK IN PLACE.
SPOTTERS ASSIGNED
RADIO COMMUNICATION VERIFIED
I
SPOT RIG AND SET DOWN
I
"`RIG ACCEPTED AT 22:15-
22:15 -
00:00
1.75
RIGU
P
PRE
WORK ON RIG UP CHECKLISTS
620/2017
00:00 -
01:00
1.00
RIGU
P
PRE
CONTINUE WITH RIG UP CHECKLIST
01:00 -
03:30
2.50
RIGU
P
PRE
RU TO WING VALVE- PERFORM LTT ON
SWABS / MASTER TO 3500#. GOOD TEST
NIPPLE DOWN TREE CAP. NIPPLE UP 4-1/16"
x7-1/16"ADAPTER
NIPPLE UP MPD LINE. CONTINUE RIGGING
UP
03:30 -
06:00
2.50
BOPSUR
P
PRE
COMPLETE RIG UP CHECKLIST.
INSTALL MP LINE AND DRILLNG SPOOL.
INSTALL BOPS.
06:00 -
1415
8.25
SOPSUR
P
PRE
INSTALL TURNBUCKLES, FLUID PACK STACK
TEST BOPS AS PER CHECKLIST.
25013.500 PSI EACH TEST FOR 5 MIN.
TEST ANNULAR WITH 2-3/8" AND 3-1/2" TEST
JOINT, UPPER BLIND SHEARS, UPPER 2-3/6"
PIPE SLIPS, 3" PIPE SLIPS, VBRS WITH 2-3/8"
AND 312" TEST JOINT, LOWER BLIND
SHEARS, AND LOWER 2-3/8" PIPE SLIPS.
WITNESS WAIVED BY AOGCC REP JEFF
14:15 -
17:00
2.75
BOPSUR
P
PRE
JONES.
LINE UP AND TEST INNER REEL VALVE.
PUMP 60 BBLS FORWARD TO COMPLETE
CABLE SLACK MANAGEMENT.
LINE AND TEST Ce, C9 FROM THE OPPOSITE
1700 -
1830
1.50
BOPSUR
P
PRE
SIDE.
INSTALL BHI FLOATS AND PRESSURE TEST.
18:30 -
19:00
0.50
BOPSUR
P
PRE
PRESSURE TEST UQC SUB CONNECTION.
CONDUCT RIG EVAC EXERCISE WITH
VANCLEVE CREW.
ALL PERSONS MUSTER AND ACCOUNTED
FOR IN 3 MIN.
CONDUCT AAR FOLLOWING THE DRILL.
19:00 -
20:00
1.00
BOPSUR
_
P
PRE
HOLD PRE-SPUD MEETING WITH RIG CREW__
REMOVE TEST SUB FROM END OF CT.
1
MAKE UP INJECTOR TO WELLAND TORQUE
TREE BOLTS.
LOAD BPV LUBRICATOR ONTO RIG.
BPV CREW GETS INDEPENDENT STACK
MEASUREMENTS.
Printed 822017 4:06:37PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP Page 2 or 12
Operation Summary Report
Common Well Name: B-36 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 End Date. X3-018HL-C: (2,576,514.00)
Project: Prudhoe Bay Site: PB B Pad
Rig Name/No.: CDR -2 Spud Date/Time: 4/30/1996 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000626
Active datum: KB @76.91 usft (above Mean Sea Level
Date
From -To
Him
Task
Code
NPT
Total Depth Phase Description of Operations
(hr)
(usft)
PRE PJSM AND REVIEW PROCEDURE FOR
20:00 - 23:00
3.00
BOPSUR
P
PULLING TWC.
LOAD BPV LUBRICATOR TO RIG FLOORAND
MAKE UP EXTENSIONS.
MAKE UP BPV LUBRICATOR TO WELL.
PRESSURE TEST BPV LUBRICATOR TO 2501
3,500 PSI, GOOD.
PULL BPV, ABOUT 500 PSI ON WELL.
BLEED OFF PRESSURE, PURGE BPV
LUBRICATOR WITH MEOH OUT TO TIGER
TANK.
RIG DOWN AND OFFLOAD BPV EQUIPMENT.
PRE PJSM THEN MAKE UP NOZZLE BHA.
PRE PRESSURE TEST LUBRICATOR TO 3,500 PSI,
23:00 - 00:00
1.00
RIGU
P
6/21/2017
00:00 - 01:30
1.50
RIGU
P
GOOD.
CONFIGURE PITS FOR BOTTOM KILL.
PUMP 5 BBLS MEOH TO END OF CT.
01:30 - 03:00
1.50
RIGU
P PRE CONDUCT PJSM FOR INITIAL WELL ENTRY.
OPEN WELL TO CLOSED CHOKE. WELL
SHOWS 60 PSI.
BLEED OFF TO TIGER TANK.
CHECK PRESSURE AT RIG FLOOR, NO
PRESSURE SEEN.
OPEN RISER AND OBSERVE WELL,
EVALUATE FEASIBILITY OF MAKING UP THE
MILLING BHA.
VERY SLIGHT BUBBLING SEEN. MAKE UP
RISER, PT TO 3,500 PSI, GOOD.
P PRE RIH, DISPLACE WELL FLUIDS TO TIGER TANK
03:00 - 06:00
3.00
RIGU
HOLD 150 PSI WHP.
TAG WHIPSTOCXK@11,53755K PUW
VERIFING DISPLACEMENT AT FLOWBACK
TANK
PUMPING 0.63 BPM /
06:00 - 08:15
2.25
RIGU
P
PRE DISPLACE WELL TO 1% KCL
-PUMP 1.5 HOLE VOLUME 185 BBLS AT 3.5
BPM/ 188OPSI
-FLOWCHECK WELL FOR 10 MINUTES, WELL
STATIC
-DISPLACE WELLBORE FLUIDS TO 8.6 PPG
USED DRILLING
-ONCE MUD START OUT OF NOZZLE START
POH
PRE POH PUMPING 8.6 USED DRILLING FLUID
08:15 - 10:30
2.25
RIGU
P
3.5 BPM / 2350 PSI
-STOPAT 200 FOOTAND FLOW CHECK WELL,
STATIC
10:30 - 11:15 0.75 RIGU P
PRE LD BHAAND SECURE WELL
-1.5 BBLS MORE DISPLACEMENT THAN
CALCULATED
11:15 - 12:00 0.75 RIGU P
PRE CONDUCT PRE -SPUD MEETINGAND TABLE
_
TOP DRILL ON H2S RESPONSE
WEXIT MAKE UP MILLING BHA
12:00 - 13:00 1.00 STWHIP P
- PRESSURE TEST QTS TO 3,500 PSI HIGH
FOR 5 MINUTES
- INJECTOR ON: 12:45
13:00 - 16:00 3.00 STWHIP P
WEXIT RIH WITH MILLING BHA
-0.25 BPM 1990 PSI
Printed 8/2/2017 4:06:37PM •A8 depths reported in Drillers Depths'
Printed 81212017 4.06:37PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 3 or 12
Operation Summary Report
Common Well Name. B-36
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/19/2017 End Date:
X3 -018H1 --C: (2,576,514.00)
Project: Prudhoe Bay
Site: PB B
Pad
Rig Name/No.: CDR -2
Spud Datemme: 4/30/1996 12:00 OOAM
Rig Release:
Rig Contractor. NABORS ALASKA DRILLING INC.
BPUOI: USA00000626
Active datum: KB @76.91 usR (above
Mean Sea Level)
Date
From- To
Hrs
Task
Code
NPT
Total Depth
Phase
- Description W Operations
(hr)
(usR)
16:00 - 00:00
8.00
STWHIP
P
WEXIT
MILL 3.80"WINDOW IN 4-1/2"CASING/LINER
PER BAKER REP FROM 11,537.7' MD TO
11,543.1'MD
- RATE: 2.84 BPM IN, 2.84 BPM OUT
- MUD WEIGHT: 8.66 PPG IN, 8.68 PPG OUT
-DWOB:1-3 KLBS
i- CIRC PRESSURE: 2,720 PSI
- MILL RATHOLE 7O 11,555' MD.
- PUMP 10 BELS HI -VIS SWEEP AROUND.
6/22/2017
00:00 - 01:00
1.00
STWHIP
P
WEXIT
CONDUCT ONE REAMING PASS, NOTHING
SEEN.
DRY DRIFT OF WINDOW IS CLEAN.
SAMPLE FROM MID RATHOLE IS MOSTLY
STWHIP
P
WEXIT
FORMATION.
POOH.
01:00 - 02:45
1.75
FLAG PIPE AT 11,400 FT EDP.
OPEN EDC, PAINT FLAG, FLOWCHECK WELL,
STATIC.
PUMP 3.53 BPM / 2,700 PSI.
BUILD BHA #2 AND HANG FROM PDL WINCH
STWHIP
P
WEXIT
WHILE POOH.
AT 1,000' MM OUT DENSITY IS REDUCED,
02:45 - 03:30
0.75
WITH INCREASE IN WHP.
STOP CTAND SHUTDOWN PUMP,
FLOWCHECK WELL.
ZERO LEL ON ALL GAS SENSORS.
MUD BALANCE MEASUREMENT IS Or 8.6#
HEAVY.
10 MIN FLOWCHECK IS GOOD, NO FLOW.
CIRCULATE OUT TO TIGER TANK FOR 5 MIN,
IN AND OUT MM READING 1:1 WITH SOLID
DENSITY, HOWEVER WHP IS HIGHER THAN
NORMAL. SUSPECT PARTIALLY PLUGGED
STWHIP
P
WEXIT
CHOKE OR OUT MM.
CONTINUE POOH.
03:30 - 04:00
0.50
MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
- CLOSE EDC, POWER DOWN
- INJECTOR OFF: 04:05
DRILL
P
PROD1
- MILL IS 3.79" NO-GO, 3.80 GO"
MAKE UP 4.25" DRILLING BHA #3
04:00 - 05:00
1.00
- PICK UP 2.875: ULS MOTOR (1.95"DEG AKO)
AND 3 COILTRAKTOOLS
- MAKE UP 4.25 HYCALOG BICENTER BIT
- SURFACE TESTED TOOL. GOOD TEST.
- PRESSURE TEST QTS TO 250 PSI LOW FOR
5 MINUTES 13500 PSI HIGH FOR 5 MINUTES
3.50
DRILL
+
P
PRODt
- INJECTOR ON: 05:05
RIH PUMPAT 0.25 BPM/880 PSI 80 FPM
0500 - 0830
-TIE-IN LOG, +12' CORRECTION
-8.7 PPG IN / 8.77 PPG OUT
Printed 81212017 4.06:37PM *All depths reported in Drillers Depths'
North America - ALASKA - SP
Page 4 of 12
Operation Summary Report
Common Nall Ni B-36
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/192017 End Date:
X3-016HL-C: (2,576,514.00 )
Project: Prudhoe Bay I Site: PB B Pad
Rig NameMo.: CDR -2 Spud DateRime: 4/30/1996 12:00 00AM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000626
Active datum: KB @76.91 usR (above Mean Sea Level)
Daa
From - To Him
Task
Code
NPT Total Depth Phase
Description of Operations
(hr)
(usft)
08:30 - 20:00 11.50
DRILL
P
PROD?
DRILL4.25" BUILD FROM 11,566' MD TO 11,920'
MD
- FREE SPIN: 3065 PSI, 2.8 BPM
- RATE: 2.77 BPM IN, 2.78 BPM OUT. CIRC
'PRESSURE: 3050-3302 PSI
- MUD WEIGHT: 8.81 PPG IN, 8.85 PPG OUT,
ECD: 10.42 PPG
j
-ROP: 35-65 FT/HR, WOB: 1.5-3.5 KLBS
I
PRESSURES AT WINDOW 8.7 PPG MUD
I
CHECK#12.0 BPM ANNULUS 46251
SURFACE PSI - 2326 WP 43, 2.25 BPM
ANNULUS = 4647 PSI, PUMP 2512, WHP 56
2.5 BPM ANNULUS 4670 PSI, 2700 PUMP, 56
PSI WHP
CHECK #22.0 BPM ANNULUS 4649/
SURFACE PSI -2317 WP 41, 2.25 BPM
I
ANNULUS = 4675 PSI, PUMP 2538, WHP 48
2.5 BPM ANNULUS 4700 PSI , 2829 PUMP, 56
PSI WHP
20:00 - 22:45 2.75 DRILL P PROD1
DRILL 4.25" BUILD FROM 11,920' MD TO 11,872'
MD
- FREE SPIN: 3,300 PSI, 2.76 BPM
�- RATE: 2.76 BPM IN, 2.76 BPM OUT. CIRC
PRESSURE: 3,300 - 3,500 PSI
- MUD WEIGHT: 8.81 PPG IN, 8.86 PPG OUT,
ECD: 10.42 PPG
- FOR 30 - 50 FT/HR, WOB: 1.5 - 3.5 KLBS
STACKING WEIGHT AT 11,920'.
PULL WIPER TRIP BACK TO WINDOW.
TIE-IN DEPTH WHILE AT WINDOW, CORRECT
-2 FT.
USE MPD CHOKE TO MAINTAIN 10.1 PPG
WHILE AT THE WINDOW.
CLEAN PASS UP AND DOWN.
DRILL PAST 11,930' PUMP 5 BBLS LO / HI VIS
SWEEPSAROUND.
SWEEPS DONT BRING BACK MUCH
ADDITIONAL CUTTINGS.
BLEED IA ONCE FROM 180 PSI TO 60 PSI.
22:45 - 23:30 0.75 DRILL N PRODI
WIPER TO WINDOWTO TIE-IN. DEPTH
COUNTER HAS BEEN STICKING AND NOT
RECORDING DEPTH PROPERLY.
CLEAN COUNTER WHEEL.
TIE-IN TO RA TAG, CORRECT -59 FT.
RIH TO FINISH BUILD SECTION.
23:30 - 00:00 050 DRILL P PROD1
DRILL4.25"BUILD FROM 11,970'MDTO 11,983'
MD
- FREE SPIN: 3,200 PSI, 2.76 BPM
- RATE: 2.76 BPM IN, 2.75 BPM OUT. CIRC
PRESSURE: 3,200 - 3,500 PSI
- MUD WEIGHT: 8.84 PPG IN, 8.94 PPG OUT,
ECD: 10.42 PPG
FOR 30-50 FT/HR, WOB: 1.5-3.5 KLBS
Printed 802017 4*06:37PM 'All depths reported in Drillers Depths'
Printed 8/2/2017 4:06:37PM •AII depths reported in Drillers Depths'
North America - ALASKA
- BP
Page 5 of 12
Operation Summary Report
Common Well Name: B-36
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/19/2017
End Date:
X3-018HL-C: (2,576,514.00)
Project: Prudhoe Bay
I Site: PB B Pad
Rig Name/No.: CDR -2
Spud Date/rim: 4/30/1996 12*00:00AM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000626
Alive datum: KB @76.91 us0 (above
Mean Sea Level
Date
From -To
Him
Task
Code
NPT
Total Depth
Phase
Description of Operations
(hr)
(usll
6/23/2017
00:00 - 00:30
0.50
DRILL P
12,020.00
PRODI
DRILL 4.25' BUILD FROM 11,983' MD TO
I
:12,020' MD
�- FREE SPIN: 3,200 PSI, 2.76 BPM
- RATE: 2.76 BPM IN, 2.75 BPM OUT. CIRC
PRESSURE: 3,200-3,500 PSI
- MUD WEIGHT: 8.84 PPG IN, 8.94 PPG OUT,
ECD: 10.42 PPG
- ROP: 30 - 50 FT/HR, WOB: 1.5 - 3.5 KLBS
00:30 - 02.30
2.00
DRILL P
12.020 00
PRODI
_-_DRILLTO END OF BUILD SECTION. _
PUMP 5 BBLS LO / HI VIS SWEEPSAROUND
MONITOR WELL FOR 10 MINUTES: STATIC
- MUD WEIGHT: 8.86 PPG IN, 8.91 PPG OUT
- RATE: 3.52 BPM IN, 3.50 BPM OUT
OPEN EDC, JET WHIPSTOCK TRAY
- RATE: 3.51 BPM. CIRC PRESSURE: 3,350 PSI
- PUMP 1.5X B/U FROM WINDOW.
- SWEEPS + B/U BRINGING BACK 50%
02:30 - 03:45
1.25
DRILL P
12,020.00
PRODI
EXCESS CUTTINGS.
DISPLACE WELL WITH 9.8# MUD FROM THE
WINDOW.
-FLOW CHECK WELL, STATIC
03:45 - 06:15
2.50
DRILL
P
12,020.00
PRODI
POOH
- MUD WEIGHT: 9.85 PPG IN, 9.76 PPG OUT
- RATE: 1.51 BPM IN, 0.95 BPM OUT
OPEN EDC, POH
-FLOW CHECK WELLAT 200' MD, WELL
STATIC
NO LOSSES ON TRIP OUT OF HOLE
06:15 - 06:45
0.50
DRILL P
12,020.00
PROD?
LD BHA
-POP-OFF INJECTOR AT 06:30
-SET BACK MWD OFF TO THE SIDE
1.00 T
_ _ _ __
DRILL P
12,020.00
PROD1
-LD MOTOR AND BIT
MU BHA
06:45 - 07:45
MAKE UP 4.25" DRILLING BHA #4
- PICK UP 2.875X" ULTRA LS MOTOR (1.1 °
AKO) AND 3.0° COILTRAK TOOLS
- MAKE UP HCC RWD2ST3053 P78 CUTTER
BICENTER BIT
- SURFACE TESTED TOOL. GOOD TEST.
- PRESSURE TEST OTS TO 250 PSI LOW FOR
5 MINUTES / 3500 PSI HIGH FOR 5 MINUTES,
GOOD TEST
- INJECTOR ON: 07:50
REPAIRED DEPTH TRACKER WHILE
CHANGING BHA
07:45 - 12:30
4.75
DRILL P
12,020.00
PROD1
RIH WITH 4.25"DRILLING BHA #4 FROM
SURFACE TO 12020' MD
RATE: 0
BPM IN, 0.28 .28 BPM OUT. CIRC PRESSURE:
1360PSI
- MUD WEIGHT: 8.73 PPG IN, 9.83 PPG OUT-
'
DISPLACING WHILE RIH
- LOG DOWN FOR TIE-IN FROM 10820 TO
10889'MD WITH+16.5'CORRECTION
- PU 47 KLBS, SO 17 KLBS
-CIRC FOR 15 MINUTES AT WINDOW TO
FINISH GET 9.8 PPG MUD OUT
-CLOSE EDC
-RIH THROUGH WINDOW WITHOUT ISSUES
Printed 8/2/2017 4:06:37PM •AII depths reported in Drillers Depths'
North America - ALASKA - BP Page 6 of 12
Operation Summary Report
Common Well Name: B-36 ARE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 End Date: X3-018HL-C: (2,576,514.00)
Project: Prudhoe Bay Site: PB B Pad
Rig Name/No.: CDR -2
Spud DateTme: 4/30/1996 12:00 OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI. USA00DO0626
Active datum: KB @76.91 usft (above Mean Sea Level)
Date
From -To
Him Task Code NPT Total Depth
Phase
Description of Operations
(hr) (uslt)
12:30 - 14:30
2.00
DRILL
P
_
_'
12,195.00
PROD1
DRILL 4.25"LATERAL FROM 12020'MD TO
12195' MD
- FREE SPIN: 2780 PSI ,3065PSI ON BOTTOM
- RATE: 2.85 BPM IN, 2.85 BPM OUT.
j
- MUD WEIGHT: 8.75 PPG IN, 8.79 PPG OUT,
ECD:10.66 PPG
- ROP: 40-125 FT/HR, WOB: 2 3.5 KLBS
OBSERVED DWOB COMING OFF AND PULLED
UP, STUCK ON BOTTOM
14:30 - 17:00
2.50
DRILL
N
_
12,195.00 PROD1 PULLED 80K. NO MOVEMENT. SEEING IT ON
WOB. NO PROBLEM ORIENTING.
DIFFERENTIALLY STUCK
PUMP CUTTINGS UP HOLE. LET RELAX.
ATTEMPTED TO PULL FREE. NO MOVEMENT.
PUMP 15 BELS 1% KCL SPACER / 20 BBLS
,MINERAL OIL/15 BBLS 1%KCL
LET SOAK WITH 10 BBLS OUT BIT. PULLED
_ FREE. PUMP LVT AND SPACERS OUT OF BIT.
12,195.00 PROD1 PULL BACK TO WINDOW FOR TIE -1 N.
17:00 - 18:30
1.50
DRILL
N
CORRECT+8 FT.
PULLING 1 O OVER THROUGH MASSIVE
SHALE ZONEAROUND 11,950'.
MOSTLY CLEAN PASS BACK TO BOTTOM.
USE AS DRILLED TF WITH 0.5 BPM WHILE RIH
THROUGH SHALES,
STACK WEIGHTAT 11,860' THEN POP
THROUGH.
12,195.00 PROD1 DRILL 4.25" LATERAL FROM 12,195' MD TO
18:30 - 22:00 3.50 DRILL
P
12,340' MD
- FREE SPIN: 2780 PSI ,3065PSI ON BOTTOM
- RATE: 2.82 BPM IN, 2.79 BPM OUT.
- MUD WEIGHT: 8.75 PPG IN, 8.83 PPG OUT,
ECD:10.49 PPG
- ROP: 40-125 FT/HR, WOB: 2-3.5 KLBS
- BEGIN HOLDING 10.5 PPG ECD DURING
DRILLING AND TRIPPING, AS PER ODE.
AT 12,280' PUMP 5 BBLS LO / HI VIS SWEEPS
AROUND.
- SWEEPS BRING BACK 20% EXCESS
CUTTINGS.
- CONDUCT FREQUENT SHORT PICKUPS
WHEN STACKING WEIGHT.
P
22:00 - 22:15 0.25 DRILL
12,195.00 PROD1 DRILL 4.25"LATERAL FROM 12,340'MD TO
12,340' MD
- FREE SPIN: 2,900 PSI
- RATE: 2.79 BPM IN, 2.79 BPM OUT.
- MUD WEIGHT: 8.79 PPG IN, 8.85 PPG OUT,
ECD:10.60 PPG
- ROP: 30-150 FT/HR, WOB: 2 - 3.5 KLBS
- USE MPO CHOKE TO HOLD 10.5 PPG AT
WINDOW.
- CIRC PRESSURE: 3,120 PSI WHILE
DRILLING
- WHP: 220 PSI
Printed 8/2/2017 4:06:37PM •AII depths reported in Drillers Depths'
Printed 82/2017 4:06:37PM •AIL depths reported in Drillers Depths'
North America - ALASKA
- BP
Page 7 of 12
Operation Summary Report
Common Well Name: B-36
AFE No
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 6/19/2017 End Date
X3-018HL-0:(2,576,514.00)
Project: Prudhoe Bay
Site: PB B Pad
Rig Name/No.: CDR -2
Spud DateTme: 4/30/1996 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USAOOOOOS26
Active datum: KB @76.91 usr (above Mean Sea Level)
-
Date
From -To
Him
Task
Code NPT Total Depth
Phase
Description of Operators
(hr)
Wit)
22:15 - 22:45
0.50
DRILL
N
12,360.00
PRODt
WEIGHT DRILLS OFF. TRY TO PICK UP AND
CAN'T, DIFFERENTIALLY STUCK.
GET LVT PUP INTO POSITION.
RELAX HOLE, WORK PIPE 4 TIMES 10KTO
80K, NO MOVEMENT.
SEEING TENSION ON DWOB, ABLE TO MOVE
ORIENTER FREELY.
CONDUCT PJSM THEN MIX SPACERS FOR
LVT PILL.
22:45 - 00:00
1.25
DRILL
N
12,360.00
PROD?
PUMP 15 BBLS KCL SPACER, 20 BBLS LVT,
THEN 15 BBLS KCL SPACER.
WITH 10 BELS OIL OUT, WORK PIPE ONCE
10K TO 75K, NO MOVEMENT.
SOAK FOR 10 MIN WITH 10K TENSION, COIL
_
(POPS FREE.
624/2017 00:00 - 05:00 5.00
DRILL P 12,650.00
PROD1
I DRILL4.25" LATERAL FROM 12,360' MD TO
112,650' MD
'- FREE SPIN: 2,900 PSI
- RATE: 2.84 BPM IN, 2.81 BPM OUT.
- MUD WEIGHT: 8.80 PPG IN, 8.86 PPG OUT,
ECD: 10.60 PPG
- ROP: 30-150 FT/HR, WOB: 2 - 3.5 KLBS
- USE MPD CHOKE TO HOLD 10.5 PPG AT
WINDOW.
-CIRC PRESSURE: 3,100-3,300 PSI WHILE
DRILLING
- CONDUCT FREQUENT SHORT PICKUPS
WHEN STACKING WEIGHT.
05:00 - 06:00 1.00
DRILL P 12,650.00
PROD1
PERFORM LONG WIPER TRIP TO WINDOW
FROM 12,650'MD
- RATE: 2.80 BPM IN, 2.58 BPM OUT. CIRC
PRESSURE: 3,100 PSI
- REDUCE PUMP RATEAND KEEPAS DRILLED
TF PULLING THROUGH SHALES.
- NO ISSUES ON TRIP
- 1.5'CORRECTION WITH RA TAG ON
WHIPSTOCK
0600 - 1200 600
DRILL P 12,808.00
PROD1
DRILL 4.25" LATERAL FROM 12,650'MD TO
12,808 MD
- FREE SPIN: 2,980 PSI
i-
RATE: 2.84 BPM IN, 2.81 BPM OUT.
- MUD WEIGHT: 8.80 PPG IN, 8.86 PPG OUT,
ECD: 10.60 PPG
- ROP: 30-150 FT/HR, WOB: 2 - 3.5 KLBS
- USE MPD CHOKE TO HOLD 10.5 PPG AT
WINDOW.
- CIRC PRESSURE: 3,100-3,300 PSI WHILE
DRILLING
- CONDUCT FREQUENT SHORT PICKUPS
WHEN STACKING WEIGHT
DIFFICULT DRILLING DUE WEIGHT
TRANSFER TO BIT
Printed 82/2017 4:06:37PM •AIL depths reported in Drillers Depths'
North America - ALASKA - BP Page 8 of 12
Operation Summary Report
Common Well Name: 8-36 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 End Date: X3-018HL-C: (2,576,514.00)
Project: Prudhoe Bay I Site: PB B Pad
Rig NamerNo.: CDR-2 Spud Dat—T,— 4/30/1996 12:00:OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000626
Active datum: KB @76.91 ush (above Mean Sea Level)
Date
From -To Him
! Task Code
NPT
Total Depth
Phase Description of Operations
(hr)
(usft)
12:00 - 18:15 6.25
DRILL
P
13,104.00
PRODt DRILL 4.25" LATERAL FROM 12,650'MD TO
13,104' MD
- FREE SPIN: 2,980 PSI
- RATE: 2.84 BPM IN, 2.81 BPM OUT.
I- MUD WEIGHT: 8.80 PPG IN, 8.86 PPG OUT,
ECD: 10.60 PPG
-ROP: 30-150 FT/HR, WOB: 2-3.5 KLBS
!- USE MPD CHOKE TO HOLD 10.5 PPG AT
WINDOW.
-CIRC PRESSURE: 3,100-3,300 PSI WHILE
DRILLING
�- CONDUCT FREQUENT SHORT PICKUPS
WHEN STACKING WEIGHT
-CLEAN PICKUPS, UP WT=52K, DOWN Wr=
13 - 14K.
18:15 - 18:30
0.25
DRILL
P
13,104.00
PROD? WIPER TRIP TO WINDOW.
,- PULLING @ 35 FPM, SEE 15-20K OVERPULL
@ 12,600'
- SEE INDICATIONS OF STARTING TO PACK
OFF, SLACK OFF TO NEUTRAL Wr.
- SEE RETURNS OF 1:1. SLACK OFF AND
UNABLE TO GO DOWN.
- PULL UP (1) MORE TIME, NO GOOD W/ 17K
OVERPULL.
- SLACK OFF, NOTABLE TO GO DOWN. PREP
TO PUMP MINERAL OIL.
PROD? W/ 5-6K SLACKED OFF BELOW DOWN Wr,
18:30 - 21:00
2.50
DRILL
N
13,104.00
(3.5K WOB), PUMP 15 BELS SPACER.
- PUMPING @ 1.16 BPM / 1.14 BPM OUT. 3000
PSI PUMP PRESSURE.
-MOTOR IS EITHER STALLED OR PACKED
OFF.
- FOLLOW W/ 20 BBLS MINERAL OILAND 15
BBLS SPACER.
- WITH 10 BBLS LVT OUT, PUSH DOWN HARD
AND BREAK FREE.
-PULLING HEAVY WITH HIGH CIRC
'PRESSURE. RECIPROCATE PIPE AND CLEAN
UP WELL.
21:00 - 00:00
3.00
DRILL
P
13,104.00
PROD1 WIPER TO WINDOW.
REDUCE PUMP RATE AND USE AS DRILLED
TF THROUGH SHALE ZONES.
SLIGHT DRAGGING SEEN, OTHERWISE
CLEAN PASS TO WINDOW.
PULL THROUGH WINDOW AND OPEN EDC,
PUMP 3.9 BPM 13,600 PSI.
PUMP 10 BBLS LO / HI VIS SWEEPS AROUND.
PUMP SWEEPS UPATA HIGH RATE, DONT
RETURN MUCH ADDITIONAL CUTTINGS.
RIH BACK TO BOTTOM.
PROD? CONTINUE WIPER TRIP BACK TO BOTTOM
825/2017
00:00 - 00:30
0.50
DRILL
P
13,104.00
Printed 822017 4*06:37PM 'All depths reported in Drillers Depths'
Printed 812/2017 4:06:37PM "All depths reported in Drillers Depths"
North America - ALASKA
- BP
Page 9 of 12
Operation Summary Report
Common Well Name: 8-36
APE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/19/2017 End Date:
X3-018HL-C: (2,576,514.00)
Project: Prudhoe Bay
Site: PB _BPad
Rig Name/No.: CDR -2
Spud DateTme: 4/30/1996 12:00:00AM
Rig Release:
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI. USA00000626
Active datum: KB ®76.91 usft (above Mean Sea Level)
Date
From -To
Him
Task Code
NPT
Total Depth
Phase
Description of Operators
(hr)
I(usft)
13,225.00
PROD?
DRILL 4.25" LATERAL FROM 13,105' MD TO
0030 - 03:30
_I
3.00 - DRILL P
13,225' MD
- FREE SPIN: 3,200 PSI
- RATE: 2.78 BPM IN, 2.79 BPM OUT.
- MUD WEIGHT: 8.80 PPG IN, 8.96 PPG OUT,
ECD: 10.60 PPG
- ROP: 30-150 FT/HR, WOB: 1 - 3.5 KLBS
- USE MPD CHOKE TO HOLD 10.5 PPG AT
WINDOW.
- CIRC PRESSURE: 3,100 -3,500 PSI WHILE
DRILLING
- WEIGHT TRANSFER GETTING DIFFICULT,
PUSHING UPHILL
- FREQUENT PICKUPS FOR STACKING
WEIGHT
- PUMP 5 BBLS LO / HI VIS SWEEPS AROUND
AT 13,225'.
03:30 - 09:15
5.75
DRILL
P
13,470.00
PROD?
DRILL 4.25" LATERAL FROM 13,225' MD TO
13,470' MD
- FREE SPIN: 3,200 PSI
- RATE: 2.80 BPM IN, 2.79 BPM OUT.
- MUD WEIGHT: 8.84 PPG IN, 8.86 PPG OUT,
ECD: 10.60 PPG
- ROP: 10-50 FT/HR, WOB: 1 - 3.5 KLBS
- USE MPD CHOKE TO HOLD 10.5 PPG AT
WINDOW.
- CIRC PRESSURE: 3,100.3,500 PSI WHILE
13,470.00
PROD1
DRILLING
WIPER BACK TO WINDOW
09:15 - 11:00
1.75
DRILL
P
- RATE: 2.75 BPM IN, 2.78 BPM OUT. CIRC
PRESSURE: 3,100 PSI
- REDUCE PUMP RATEAND AS DRILLED
TOOL FACE PULLING THROUGH SHALES.
- NO ISSUES ON TRIP
- 3.5' CORRECTION WITH RA TAG ON
WHIPSTOCK
11:00 - 15:30
4.50
DRILL P 13,470.00
PROD?
_
DRILL 4.25" LATERAL FROM 13,470' MD TO
13,503' MD
- FREE SPIN: 3,120 PSI
- RATE: 2.80 BPM IN, 2.80 BPM OUT.
MUD WEIGHT: 8.84 PPG IN, 8.86 PPG OUT,
ECD: 10.60 PPG
- ROP: LESS THAN 5'/HR FT/HR, WOB: 1 -3.5
KLBS
- USE MPD CHOKE TO HOLD 10.5 PPG AT
WINDOW.
-CIRC PRESSURE: 3,100-3,500 PSI WHILE
DRILLING
VERY LITTLE DIFFERENTIAL PRESSURE AND
POOR EFFECTIVE WOB
Printed 812/2017 4:06:37PM "All depths reported in Drillers Depths"
Printed 8/2/2017 4:06 37PM 'All depths reported in Drillers Depths'
North America - ALASKA
- BP
Page 10 of 12
Operation Summary Report
Common Well Name: B-36
AFE No
Event Type: RE-ENTER- ONSHORE
(RON)
Start Date: 6/19/2017
End Date:
X3-018HL-C: (2,576,514.00)
Pmjecl: Prudhoe Bay
Site: PB B Pad
Rig Name/No.: CDR -2
Spud DateTme: 4/30/1996 12:00:00AM
Riq Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000826
Active datum: KB @76.91usft (above Mean Sea Level)
Date
From- To
Hm
Task Code NPT Total Depths
Phase
Description of Operations
(hr)
(usR)
PROD1
POH
15:30 - 19:30
4.00
DRILL
_ _ _ _
P
13,503.00
PUMP 5 BELS LO/ Al VIS SWEEPSAROUND.
MONITOR WELL FOR 10 MINUTES: STATIC
- MUD WEIGHT: 8.86 PPG IN, 8.91 PPG OUT
- RATE: 2.8 BPM IN, 2.77 BPM OUT
SWEEPS + B/U BRINGING BACK 20%
EXCESS CUTTINGS.
OPEN EDC
- RATE: 3.51 BPM. CIRC PRESSURE: 3,350 PSI
�
IN 9.8 PPG KILL WEIGHT MUD FROM
- LFROM
OPEN HOLE TO SURFACE.
18:30 - 21:00
1.50
DRILL
P
13,503.00
PROD?
MONITOR WELL FOR 10 MINUTES AT BHA
STATIC
- CLOSE EDC, POWER DOWN
- INJECTOR OFF: 20:00
- BIT IS 3-1.
21:00 - 21:30
0.50
BOPSUR P
13,503.00
PROD1
PJSM AND REVIEW PROCEDURE FOR
FUNCTION TESTING BOPS.
PERFORM WEEKLY FUNCTION TEST OF
BOPS.
RECORD CLOSING TIMES.
21:30 - 22:00
0.50
DRILL P
13,503.00
PRODt
REPAIR SERVICE LOOP COVER.
22:00 - 00:00
2.00
DRILL P
13,503.00
PROD1
REPLACE FLOATS IN UOC.
CHANGE OUT CT PACKOFFS.
PRESSURE TEST FLOATS AND CT PACKOFFS,
GOOD.
6/26/2017 00:00 - 02:00
2.00
DRILL P
13,503.00
PROD1
REMOVE INJECTOR.
TAKE OFF NOZZLE.
MAKE UP 4.25" DRILLING BHA #5
- PICK UP 2-7/8° ULS MOTOR (1.1 DEG AKO)
AND 3° COI LTRAK TOOLS
- MAKE UP 4.25 HYC BICENTER BIT WITH
DURAFORCE CUTTERS
- SURFACE TESTED COILTRACKAND
AGITATOR TOOL. GOOD TEST.
- PRESSURE TEST QTS TO 3,500 PSI HIGH
FOR 5 MINUTES
- INJECTOR ON: 01:40
- WHILE MAKING UP BHA, CONDUCT KICK
DRILL WITH COYNE CREW.
- WELL IS SECURED IN ABOUT 1 MIN, WITH
ALL PERSONNEL REPORTING TO ASSIGNED
POSITIONS.
_
-CONDUCTAAR.
02:00 - 05:30
3.50
DRILL P
13,503.00
PROD1
RIH WITH 4.25" DRILLING BHA #5
- RATE: 0.3 BPM IN, 0.56 BPM OUT. CIRC
PRESSURE: 1,065 PSI
- MUD WEIGHT: 8.86 PPG IN, 9.79 PPG OUT
-DISPLACE CT TO DRILLING MUD AS RIH.
- USE MPD CHOKE TO MAINTAIN 10.5 PPG AT
THE WINDOW.
- LOG DOWN FOR TIE-IN FROM 10,800' MO
(FORMATION) WITH +8' CORRECTION
- PARK ABOVE WINDOW AND CIRCULATE 9.8#
I MUD OUT.
Printed 8/2/2017 4:06 37PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP Page 11 of 12
Operation Summary Report
Common Well Name: 8-36 APE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 End Date- X3-018HL-C: (2,576,514.00)
Project: Prudhoe Bay Site: PB B Pad
Rig Name/No.: CDR -2 Spud Daterrime: 413011996 12:00:OOAM Rig Release:
Rig Contractor. NABORSALASKA DRILLING INC. BPUOI: USA00000628
Active datum: KB @76.91 usft (above Mean Sea Level)
Date
From - To
Him
Task
Code
NPT
Total Depth
Phase Desorption of Operations
(hr)
i
(usft)
05:30 - 06:45
125
DRILL
P
13,503.00
PROD? RIH WITH 4.25° DRILLING BHA N6 FROM
11,550' MO TO 13503' MO
- RATE:.35 BPM IN, .35BPM OUT. CIRC
PRESSURE: 1770 PSI
- MUD WEIGHT: 8.95 PPG IN, 8.99 PPG OUT
NO ISSUES RIH THROUGH SHALES
0845 - 1500
8.25
DRILL
P
13,695.00
PROD?
DRILL 4.75" LATERAL FROM 13503' MD TO
13695' MD (8787' TVD)
- FREE SPIN: 3635 PSI, 2.70 BPM
- RATE: 2.8 BPM IN, 2.8 BPM OUT. CIRC
PRESSURE: 38504110 PSI
�I- MUD WEIGHT: 8.9 PPG IN, 8.9 PPG OUT,
ECD: 10.85 PPG
:-ROP: 5-35 FT/HR, WOB: 1.2-2.5 KLBS
TOOK 2.8 BPM BEFORE SEEING POSITIVE
AGITATOR MOVEMENT
_
15:00 - 16:00 1.00 DRILL P
13,695.00
PRODt
PUMP HIGH/LOW SWEEPS
SEEN ANNULAR PRESSURE INCREASING
(11.6 ECD) BEFORE SWEEPS EXIT,
HOLE STARTED TAKING FLUID 2.8 BPM LOSS
RATE = 0.75 BPM /45 BPH
SLOWED PUMP TO 2 BPM LOSS RATE AT 0.5
BPM 30 BPH
-NOTIFIED WSUP OF LOSSES OF 30 BPH
j
MUD WT IN 8.88 IN 8.82 OUT 2700 PSI
13,695.00 PROD? WIPER HOLE BACK TO WINDOW
1600 - 1730 1.50 DRILL P
PUMP 2 BPM EXCEPT THROUGH SHALE
SECTION
LOSS RATE A 2 BPM IS STILL 0.5 BPM
2 BPM 1770 PSI.
HANGING UP AT WINDOW, WORK CT UP AND
DOWN TO GET THROUGH.
STILL DRAGGING AFTER PULLING THROUGH
WINDOW. PICK UP AND WORK PIPE TO
CLEAN UP WELL.
17'.30 - 2120 3.83 DRILL P
13,695.00 PROD1 OPEN EDC, WIPER TO SURFACE.
GETTING 30 BBL/HR LOSS RATE NEAR
WNDOW, GRADUALLY IMPROVING AS THE
CT IS PULLED UPHOLE.
NEAR WINDOW 2.0 / 1.23 BPM AT 50 FT/MIN.
AT 9,000 FT 2.68 / 2.20 BPM AT 50 FT/MIN.
PUMPS BBLS LO/ HI SWEEPS AROUND.
AT 8,400 FT 3.33 / 2.91 BPM AT 50 FT/MIN.
MW: 8.85 / 8.85 PPG IN / OUT.
USE MPD CHOKE TO HOLD 10.1 PPG AT THE
WINDOW.
21:20 - 00:00
2.67
DRILL
P
13,695.00
PROD1
RIH BACKTO WINDOW.
PUMP 1 BPM, HOLD 10.1 PPG AT THE
WINDOW.
TIE-IN DEPTH AT FORMATION, CORRECT -8
FT.
PASS THROUGH WINDOW WITH NO ISSUES,
RIH TO BOTTOM.
Printed 81212017 4.06:37PM •AII depths reported in Drillers Depths'
North America - ALASKA - BP Page 12 of 12
Operation Summary Report
Common Nkll Name: B-36 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 Eno Date: X3-018HL-C: (2,576,514.00)
Project Prudhoe Bay Site: PB B Pad
Rig Name/No.: CDR -2 Spud Daterhme: 4/30/1996 12:00:OOAM Rig Release:
Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000626
Active datum: KB @76.91 usft (above Mean Sea Level)
Date
From -To
Him
Task
Code
NPT
Total Depth
Phase Description of Operations
(hr)
(usR)
PROD1 CONTINUE RIH.
6/27/2017
00:00 - 01:45
1.75
DRILL
P
! 13,702.00
PAST THE LAST BIG SHALE ZONE START
BEAD PILL IN 9.88 MUD DOWN THE CT.
CLEAN PASS TO BOTTOM.
TAG AT 13,707, CORRECTED DRILLED DEPTH.
PERFORM DYNAMIC FLOW CHECK NEAR
BOTTOM, ON LOSSES.
01:45 - 05:45 4.00 DRILL
P
13,702.00
PROD1
BEADS OUT THE BIT, POOH LAY IN BEAD PILL
IN 9.8# MUD UP TO WINDOW.
CLEAN PASS TO WINDOW, SLIGHT
OVERPULL ONCE AT 11,870'.
PULL THROUGH WINDOWAND PERFORM 100
SFT JOG, OPEN EDC.
JET WHIPSTOCK TRAY.
POOH WHILE CIRCULATING IN HEAVY MUD.
- MUD WEIGHT: 9.80 PPG IN, 8.89 PPG OUT
- RATE: 1.96 BPM IN, 1.92 BPM OUT
- CIRC PRESSURE: 1,810 PSI
- FLAG PIPE WHILE POOH.
0545 - 0700 1.25 DRILL
P
13,702.00
PROD- LAYDOWN BHA
- INJECTOR OFF @ 05:45 HRS.
-INSPECT COILABOVE CONNECTOR
P
13,702.00
07:00 - 08:00 1 00 DRILL
PROD1 CLEAR FLOOR AND LAY OUT BHA.
- BIT GRADED 1-2.
Printed 8/2/2017 4.06:37PM 'Ail depths reported in Drillers Depths'
North America - ALASKA - BP Paget of 9
Operation Summary Report
Common Well Name: B-36 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 6/2712017 End Date: X3-018HL-C: (1,055,885.00)
Project: Prudhoe BayI Site: PB B Pad
Rig Name/No.: CDR -2 Spud Datelrme: 4/30/1996 12:00:OOAM
Rig Release:
Rig Contractor. NABORS ALASKA DRILLING INC. BPUO I: USA00000626
Active datum: KB @76.91usft (above Mean Sea Level)
Date
From - To
Hire
Task
Code
NPT
Total Depth
Phase Description of Operations
_
hr
Waft)
6/27/2017
08:00 - 12:00
4.00
RIGU
P
13,702.00
RUNPRD PJSM. CUT OFF 100' OF 2 3/8", 4.41 PPF COIL.
- RE HEAD. PULL TEST 50K AND PRESSURE
TEST @ 4500 PSI, OK.
RUNPRD PJSM. PICK UP (2) JTS OF 2 3/8" PH -6 TUBING
12:00 - 13:30
1.50
RIGU
P
13,702.00
AND WU TO COIL.
- PUMP SLACK FORWARD. BREAK OFFAND
CUT 334' OF 5116'E LINE.
-REBOOT.
RUNPRD PJSM. PUMP 3/4"BALLAROUND.
13:30 - 15:30
2.00
RIGU
P
13,702.00
- PUMP 90 BBLS AT 4 BPM..., DID NOT HEAR
BALL GO OVER GOOSENECK
- RECOVERED BALLAND BOOT, RE BOOT
15:30 - 16:00
0.50
RIGU
P
13,702.00
ELINE.
RUNPRD REVIEWED PROCEDURE FOR RUNNING
LINER.
- REVIEWED RISKS AND CORRESPONDING
MITIGATIONS.
- TABLE TOP DRILL ON SHUTTING IN THE
WELL WHILE RUNNING LINER.
- DISCUSSED HOW WE RESPOND TO H2S
ALARMS GOING OFF WHILE SHUTTING IN
WELL.
- GOOD DISCUSSION WITH CREW AND TOOL
PUSHER PRESENT.
16:00 - 19:00
3.00
RIGU
P
13,702.00
RUNPRD RUN 2-716'x 3-11N'x 31/1' 13CR85 LINER TO
2,803'MD
-FILL PIPE EVERY 10 JTS
RUNPRD CONTINUE MAKING UP LINER.
19:00 - 19:30
0.50
RIGU
P
13,702.00
OCCASIONAL LEL READINGS NOTED (4 - 8%)
FROM SENSORS ON SHAKER, CHOKE, AND
RIG FLOOR.
READINGS NOT HIGH ENOUGH TO ACTIVATE
ANY ALARMS.
STOP AND CHECK THESE AREAS WITH
HANDHELD MONITOR, SHOWING ZEROS ALL
AREAS.
VERIFY NO -FLOW FROM WELL, TRIP SHEET
IS -1 BBLS SINCE THE START OF MAKING UP
LINER.
CALL NABORS ELECTRICIAN OUT TO
TROUBLESHOOT SENSORS.
NOTIFY WSUP OF LEL READINGS.
19:30 - 20:00
0.50
RIGU
N
13,702.00
RUNPRD
ELECRICIAN ON LOCATION.
STOP OPERATIONS AND INSTALL SAFETY
JOINTAND TORQUE IT UP WHILE
ELECTRICIAN CALIBRATES ALL SENSORS.
CONTINUE TO MONITOR FLUID LEVEL IN
WELL, NO BUBBLING, STATIC FLUID LEVEL.
MONITOR SHAKER AND RIG FLOOR WITH
HANDHELD GAS DETECTOR FOR THE REST
OF THE LINER JOB.
20:00 - 00:00
4.00
RIGU
P
13,702.00
RUNPRD LAY DOWN SAFETY JOINT, CONTINUE
MAKING UP LINERAS PER LINER SUMMARY.
NO MORE LEL READINGSAFTER
CALIBRATION.
Printed 8/2/2077 4:06:04PM •Ai depths reported in Drillers Depths'
North America - ALASKA - BP Page 2 of 9
Operation Summary Report
Common Well Name: B-36 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 6/27/2017 End Date: X3 -0181-11--C: (1,055,885.00 )
Project: Prudhoe Bay I Site: PS B Pad
Rig Name/No.: CDR -2 Spud Date/Time: 4/30/1996 12:00:00AM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000626
Active datum: KB (876.91 usft (above Mean Sea Level)
Data
From - To
Hrs
Task
Code
NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
6/28/2017
00:00 - 03:45
3.75
RIGU
P
13,702.00
RUNPRD CONTINUE MAKE UP LINER AND RUNNING
TOOLS,
FILL EVERY 10 JTS.
RUN LINER ON COIL
- PRESSURE TEST OTS TO 3,500 PSI HIGH
FOR 5 MINUTES
- INJECTOR ON: 03:40
RUNPRD RIH WITH 2-7/8"X3-1/4"X3-1/2"COMPLETION
03:45 - 07:00
3.25
RUNCOM
P
13,702.00
BHA
- RUN DOWN WITH 15-16 K SLACK OFF
WEIGHT PUMPING AT.3 BPM, 1150-1370 PSI
- VERY SLIGHT LOSSES DURING RIH
- MW IN AND OUT 9.84 PPG
- CIRC DOWN BEADS PER PRESCRIBED PLAN
FORWARD
- PICK UP WEIGHTAT WINDOW WITH PUMPS
OFF 74K INITIAL. PICKUPAND BRING ON
PUMPS, JOG 1 000'TO GET BEADS DOWN
ANDAROUND. PICKUP GOOD AT 68-70K
MOVE DOWN, SLACK OFF WEIGHT OF 16K.
PICK UP WEIGHT AT WINDOW OF 65K WITH
PUMPS ON AT .5 BPM.
07:00 - 08:15
1.25
RUNCOM
P
13,702.00
RUNPRD
MOVE THROUGH WINDOWAND RUN DOWN
INTO OPEN HOLE
- MUD WEIGHT: 9.82 PPG IN, 9.82 PPG OUT
- RATE .54 BPM IN, .72 BPM OUT AND CIRC
PRESSURE OF AVERAGE 1300 PSI
- MUD LOSSES WHILE RIH MINIMAL
- TAG UP AT 12,658'. COINCIDES WITH
BEGINNING OF SHALE SECTION FROM
12,670' TO 12,870'.
08:15 - 13:30 5.25
RUNCOM N 13,702.00
RUNPRD WORK LINER ASSEMBLY DOWN FROM 12,658'
- PUW WHILE WORKING 65-71K, SOW
FALLING TO LOW AS -3K
- DIFFICULT TO MAKE ANY PROGRESS PAST
,12,850'. CYCLE PIPE 30 TIMES IN THIS AREA.
PUMP DOWN 40 BBL FRESH 9.8 PPG MUD
PILL WITH FULL LUBES IN ATTEMPT TO
WORK DOWN LAST 20' THROUGH SHALE.
- CIRC RATE OF .65-.72 BPM, 1375-1480 PSI.
- MADE PROGRESS UP TO 12,889' WHILE
CIRCULATING DOWN FRESH MUD PILL
MADE SHORT WIPER UP TO 12,800', VERY
DIFFICULT TO MOVE BACK DOWN. FRESH
MUD PILL HELPED GET BHA BACK DOWN TO
12,867'. CANNOT MAKE PROGRESS.
DISCUSS WITH ODEAND TOWN TEAM.
Pnnted 8/2/2017 4:06:04PM `All depths reported in Drillers Depths'
North America - ALASKA - BP Page 3 of 9
Operation Summary Report
Common Well Name: B-36 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 6/27/2017 End Date: X3-018HL-C: (1,055,885.00)
Project: Prudhoe Bay Site: PB B Pad
Rig Name/No.: CDR -2 Spud Daternme: 4/30/1996 12:00:OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000826
Active datum: KB Q78.91 usft (above Mean Sea Level)
Date
From- To
Hrs
Task
Code
NPT
Total Depth
Phase Description of Operations
(h0
(usft)
13:30 - 18:00
4.50
RUNCOM
N
13,702.00 RUNPRD ATTEMPTTO USE DRILLING ECD OF 10.5 PPG
TO INHIBIT SHALE WITH NO MOVEMENT.
WORK PIPE THROUGH INTERVAL, PUW
INCREASED TOAS HIGH AS 90K (-20K OVER).
SEEMS TO BE DEFINITE LEDGE AT 12,867'.
- INCREASING SYSTEM LUBRICANT LEVELTO
4% OVER TIME. MOBILIZE IN MINERAL OIL
AND PREPARE SPACER.
- RECORDING 6-7 BPH LOSSES WITH
INCREASED PRESSURE AND NO MOVEMENT.
DECIDE TO STOP USING INFLUENCED ECD.
LOSSES STOPPED IMMEDIATELY.
- MAKE ATTEMPTS TO MOVE PIPE BUT
HAVING HEAVY PICKUPS AT 12,848' AND
CANNOT PULLABOVE THAT. CIRCULATING
AT .52 BPM IN, .47 BPM OUT, 1400 PSI.
- PUMP DOWN SPACER - MINERAL OIL -
SPACER COMBO FOLLOWED BY HIGHER
LUBE CONCENTRATION 9.8 PPG MUD
SYSTEM. CIRCULATE DOWN AT.96BPM,
1625 PSI.
- CONTINUE MAKING EFFORTS TO MOVE
DOWN WHILE PUMPING DOWN MINERAL OIL;
ATTRIBUTE INITIAL MOVEMENT TO HIGHER
CIRC RATES. MOVE TO 12,902'.
- SLOW CIRCULATION RATES DUE TO
PRESSURE LIMITATIONS. PUMP RATES
VARYING FROM.01 BPM TO.22 BPM AT
1670-1780 PSI. STILL ABLE TO MOVE PIPE
AND MAKING FORWARD PROGRESS.
MOVING PIPE IN SLOW INCREMENTS BUT
MAKING PROGRESS. PICKUP WEIGHTS
FAIRLY HEAVY, RANGING FROM 65-94K.
118:00 - 2100 3.00
RUNCOM
N
13,702.00
RUNPRD
WORK PIPE TO 13,040', NO FURTHER
PROGRESS.
! CONTINUE CIRCULATING MINERAL OIL TO
SHOE.
TRY WORKING PAST 13,040' PERIODICALLY.
CIRCULATE 0.50 BPM / 1,750 PSI.
ABLE TO GET TO 1 BPM / 1,750 JUST BEFORE
OIL EXITS SHOE.
WITH 3 BBLS OIL OUT GO TO 0.25 BPM,
START WORKING PIPE DOWN.
ABLE TO WORK DOWN PAST 13,2001.
LOTS OF CUTTINGS COMING BACK.
WORK DOWN TO 13,260'.
WITH ALL OIL OUT PARK AT 13,246' AND
CIRCULATE.
USE MPD CHOKE TO APPLY 250 PSI WHP
WHILE LVT IS CIRCULATED OUT. CONTINUE
CIRCULATING 1.18 11 As BPM AT 1,830 PSI
'WITH
230 PSI WHP.
Printed 82/2017 4:06:04PM 'AII depths reported in Drillers Depths'
North America - ALASKA - BP Page 4 of 9
Operation Summary Report
Common Well Nacre: B-36 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 5/27/2017 End Date: X3-018HL-C: (1,055,885.00)
Project: Prudhoe Bay Site: PB B Pad
Rig Name/No.: CDR -2 Spud Daterrme: 4/30/1996 12:00:OOAM
Rig Release:
Rig Contracts: NABORS ALASKA DRILLING INC.
BPUOI: SSA00000626
Active datum: KB @76.91usit(above Mean Sea Level)
Date
From - To Him
Task
Code
NPT
Total Depth
Phase
Description of Operations
(hr)
Wait)
21:00 - 23:00
2.00
RUNCOM
N
13,702.00 RUNPRD WITH LVT INTERFACE BACK TO SURFACE, NO
INCREASE IN VISCOSITY NOTED. FUNNEL
VIS OF INTERFACE IS 57 SEC, NORMAL MUD
IS 55 SEC.
STILL GETTING GOOD AMOUNT OF
CUTTINGS BACK, MOSTLY BEADS AT THIS
POINT ACCORDING TO GEO.
WITH LVT OUT OPEN MPD CHOKE, GETTING
1,G4 10,11 BPM AT 1,800 PSI,
CONTINUE TRYING TO WORK PIPE
PERIODICALLY, NO PROGRESS.
PARKAT 13,243' AND DISCUSS WITH ODE TO
PUMP ANOTHER MINERAL OIL PILL.
CONTINUE WORKING PIPE PERIODICALLY,
NO PROGRESS PAST 13,242'.
13,702.00 RUNPRD PUMP 15 BBLS 6% KCLVIS BRINE WITH NO
23:00 - 00:00
1.00
RUNCOM
N
LUBES SPACER, 20 BBLS LVT, 15 BBLS 6%
KCL VIS BRINE WITH NO LUBES.
PUMP 0.92 / 0.90 BPM AT 1,700 PSI.
REDUCE PUMP AS NEEDED TO STAY BELOW
1,900 PSI.
6/29/2017
00:00 - 01:30
1.50
RUNCOM
N
13,702.00
RUNPRD
CONTINUE CIRCULATING LVT TO SHOE.
SLOWLY INCREASE RATE KEEPING PUMP
PRESSURE < 1,900 PSI.
01:30 - 02:15
0.75
RUNCOM
N
13,702.00
RUNPRD
5 BBLS LVT OUT, START WORKING PIPE.
WORK PIPE DOWN TO 13,265' CAN'T PASS
THIS SPOT.
REVIEW COILLIFE, ABOUT 28% NOW IN THIS
AREA.
TRY VARIOUS RUNNING SPEEDS, PUMPS ON,
PUMPS OFF, DIFFERENT WHP. UNABLE TO
PASS 13,265'.
TRY LETTING LVT SOAK, NO PROGRESS.
PICK UP 60 FT AND TRY TO RIH FAST, LOSING
HOLE.
WORK BACK DOWN TO 13,237'.
02:15 - 04:15 2.00
RUNCOM
N
13,702.00 RUNPRD PUMP REMAINING LVT OUT, LET SOAK. PUT
300 PSI ON WHP.
AFTER 15 MIN PUSH DOWN TO 13,256'.
AFTER 10 MIN PICK UPAND PUSH DOWN TO
13,263'.
WAIT AND PUSH DOWN 7013,277'. KEEP 300
PSI ON WHP.
AFTER 10 MIN PICKUPAND PUSH DOWN TO
13,288'.
WAIT S70 MIN EACH TIME THEN WORK PIPE
DOWN.
TRY PUMPS ON AND OFF EACH TIME.
ABLE TO WORK DOWN TO 13,294'.
Printed 8/2/2017 4:06:04PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP Page 5 of 9
Operation Summary Report
Common Well Name: B-36 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 6/27/2017 End Date: X3-018HL-C: (1,055,885.00)
Project: Pmdhoe Bay Site: PB B Pad
Rig Name/No.: CDR -2
Spud Date/rime: 4/30/1996 12:00:OOAM Rig Release:
Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00000626
Active datum: KB Q76.91usft (above Mean Sea Level)
Date
From- To
Him
Task
Code
NPT
Total Depth
Phase Description of Operations
(hr)
(usft)
RUNPRD CONTINUE WORKING PIPE DOWN
04:15 - 14:45
10.50
RUNCOM
N
13,702.00
- WORK PIPE WHILE MINERAL OIL PILL IS
BEING CIRCULATED OUT OF WELLBORE
- MAKING INCONSISTENT BUT STEADY
PROGRESS USING VARYING PUMP RATES
AND SHORT PICKUPS
- LOSING ALL RETURNS AT ANYTHING LESS
THAN 1.1 BPM. FLUID LEVEL ISAT MUD
CROSS; SOON AS RATE IS BROUGHT TO 1.2
BPM RETURNS AT SHAKER. COMBINATION
OF LOWER PUMP RATES AND SHORT
PICKUPS SEEM TO HELP MOVEMENT
PROGRESS.
- PICKUP WEIGHTS BETWEEN 72 KAND 91K,
MOSTAVERAGING MID 80 K
- PUMP TWO ITERATIONS OF BEADS DOWN
ONE HOUR APART TO SEE IF IT WILL HELP
WITH SLOWING LOSSES/ INCREASE PIPE
MOVEMENT BUT DID NOT SEEM TO HELP.
-TD FLAG 2' OFF, BHA IS ON DEPTH
-CONDUCTED VAPOR TEST ON DEAD CRUDE
AS CONTINGENCY, VAPOR PRESSURE
TOLERANCE GOOD AT .9 PSI
- HAVING DIFFICULTY GETTING PAST 13,444'
14:45 - 17:30
2.75
RUNCOM
N
13,702.00
RUNPRD CIRCULATE DOWN 15 BBL KCL SPACER PILL -
18 BBLS LV!- 15 BBL KCL SPACER PILL AT
INITIAL RATE 1.38 BPM, 1820 PSI.
- RATE AS LOW AS A BPM DUE TO
PRESSURE LIMITATIONS BUT MOST
CIRCULATION DOWN AT .6-.7 BPM IN, .1-.15
BPM OUT, 1680-1880 PSI
- CONTINUING WITH EFFORT TO MOVE TO
BOTTOM WHILE CIRCULATING AND MOVING
FORWARD WITH VERY SMALL BITES
RUNPRD CONTINUE WORKING PIPE DOWN TO 13,489'
1730 - 1830
1.00
RUNCOM
N
13,702.00
RETURNS HAVE GONEAWAY, LINE UP TO
FILL THE WELLACROSS THE TOP, FILL WITH
1 BBL.
LET LVT SOAKAWHILE AND KEEP WORKING
PIPE.
18:30 - 20:00
1.50
RUNCOM
N
13,702.00 RUNPRD APPLY 200 PSI WHP FROM THE TOP.
CONTINUE WORKING PIPE DOWN TO 13,523'.
PUMP 1 - 2 BBLS LVT OUT PERIODICALLY,
LEAVE WELL SHUT IN.
WORK PIPE DOWN TO 13,522'.
13,702.00 RUNPRD PUMP I MORE BBL LVT OUTAND LET SOAK
20:00 - 21:20 1.33 RUNCOM
N
WORK DOWN TO 13,567',
PUMP 1 MORE BBL OUTAND LET SOAK
WORK PIPE DOWN TO 13,575'.
KEEP 200 PSI ON WHP.
WORK PIPE DOWN TO 13,597'.
13,702 00 RUNPRD CONTINUE WORKING PIPE WITH THE CHOKE
21:20 - 23:00 1.67 RUNCOM
N
CLOSED.
PICK UP JUST TO BREAKOVER EACH TIME
AND RIH QUICKLY.
WORK PIPE DOWN TO 13,612'.
PUMP 1 MORE BBLS OF LV OUT AND APPLY
200 PSI WHP, LET SOAK.
CONTINUE WORKING PIPE DOWN TO 13,660'.
Pnnted 8/2/2017 4*06:04PM 'All depths reported in Drillers Depths'
Printed 82/2017 4:06:04PM `All depths reported in Drillers Depths'
North America - ALASKA
- BP
Page 6 of 9
Operation Summary Report
Common Well Name: B-36
AFE No
Event Type: COM- ONSHORE (CON)
Start Date:6272017
End Date.
X3-018HL-C: (1,055,88&00)
Project: Prudhoe Bay
Site: PB B Pad
Rig Name/No.: CDR -2
Spud DateMme: 4/30/1996 12:00:00AM
1 Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
I BPUO1: USA00000626
Active datum: KB Q76.91 usft (above Mean Sea Level)
Date
From - To
Hire
Task
Code
NPT
Total Depth
Phase
Description of Operators
(hr)
(usft)
23:00 - 00:00
1.00
RUNCOM
N
13,702.00
RUNPRD
OPEN CHOKE AND CIRCULATE, GET GOOD
CIRCULATION INITIALLY THEN RETURNS
FALLING OFF.
CIRCULATE 0.8 / 0.2 BPM OUT TO TIGER
TANK, LVT INTERFACE MAY BE COMING
1
BACK.
TRY WORKING PIPE WHILE CIRCULATING,
LOSE 5 FT BACK TO 13,655'.
CLOSE CHOKE BACK IN AND PUT 200 PSI
WHIP ABLE TO WORK DOWN TO 13,680'.
6/30/2017
00:00 - 01:00
1.00
RUNCOM
P
13,702.00
RUNPRD
WORK DOWN TO 13,680' NO FURTHER
,PROGRESS.
HAVE HIT THIS SPOTABOUT 10 TIMES.
CONSIDER THIS DEPTH TD. UNCORRECTED
TO AT 13,689.
PERFORM 3PICKUPS HERE, EACH AT 35
FT/MIN.
BREAKOVER IS 68K, 68K, 70K, EACH TIME
WITH THE SAME STRETCH.
01:00 - 02:30
1.50
RUNCOM
P
13,702.00
RUNPRD
PUMP 5/8" STEEL BALLAROUND AT 1.96/0.21
BPM.
CIRC PRESSURE IS 2,560 PSI.
BALL IS NOT HEARD ROLLING.
AFTER 29 BBLS AWAY LAUNCH AGAIN WITH
1
3,000 PSI,
SLOW PUMP TO 0.75 BPM AFTER 35 BBLS
AWAY.
AFTER 70 BBLS AWAY, NO SIGN OF BALL.
TRY CYCLING REELAND PUMP, NO LUCK.
02:30 - 03:00
0.50
RUNCOM P
13,702.00
RUNPRD
RE -LAUNCH WITH 2,500 PSI.
BALL ON SEAT AT 115 BBLS AWAY,
PRESSURE UP TO 4,500 PSI TO SHEAR OUT
RUNNING TOOL,
PERFORM 2 PICKUPS, EACH AT 35 FT/MIN.
BREAKOVER IS 54K, 56K, EACH TIME WITH
THE SAME STRETCH.
SET BACK DOWN 1 OK ON THE TOOL.
Printed 82/2017 4:06:04PM `All depths reported in Drillers Depths'
North America - ALASKA - BP Page 7 of 9
Operation Summary Report
Common Well Name: B36 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 6/27/2017 End Date: X3-018HL-C: (1,055,885.00)
Project: Prudhoe Bay Site: PB B Pad
Rig Name/No.: CDR -2 Spud DateRme: 4/30/1996 12:00:OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC. _ SPUOI: USA00000626
Active datum: KB @76.91 usR (above Mean Sea Level)
Date
From - To
Hrs
Task
Code
NPT
Total Depth
Phase
Description of Operators
(hr)
_ _
CEMT
(usil)
03:00 - 10:00
7.00
P
13,702.00
RUNPRD SWAP WELL TO 8.4 PPG 1%KCL.
AFTER KCL REACHES SHOE, RETURNS ARE
LOST.
LINE UP TO DISPLACE MUD IN ANNULUS BY
BULLHEADING KCL.
BULLHEAD 140 BBLS 8.4 PPG KCL DOWN
BACKSIDE AT INITIAL RATE OF i BPM / 1,350
PSI.
-PRESSURES DROPPING AS HEAVIER FLUID
IS BULLHEADED INTO FORMATION.
CIRCULATION PRESSURE DOWN TO 920 PSI
AS 8.4 PPG KCL IS EXITING WINDOW ON
BACKSIDE.
- LINE UP CIRCULATION PATH DOWN COIL
WITH RETURNS NORMAL WAY. BRING ON
PUMPS SLOWLY TO BREAK CIRCULATION.
BRING PUMPS UP TO 1.35 BPM, 495 PSI, WITH
1.15 BPM RETURNS. CONTINUE INCREASING
PUMP RATE UP TO 1.45 BPM WITH 1.27 BPM
RETURNS.
- FINAL CIRCULATION RATE WITH 8.4 PPB 1%
KCLAROUND AT 2.25 BPM, 1340 PSI, WITH
RETURNS AVERAGING 1.70 BPM. LOSS RATE
ESTABLISHED ATAVERAGE OF 28 BPH.
-CONTINUE WITH CIRCULATION WHILE
CEMENTERS LINE UP FOR PRESSURE
TESTING LINES, CONDUCT PRESSURE
CROSSCHECK DISCUSSION WITH SL8
CEMENTING CREW FOR PRESSURE TESTING
LINES. PRESSURE TEST CEMENT LINES UP
TO INNER REEL VALVE TO 250 PSI LOW/ 4700
PSI HIGH.
- CIRCULATE WHILE CREWS CONDUCT
'CHANGEOUT. CONDUCT PJSM FOR CEMENT
JOB. REVEIW PRESSURE CROSSCHECK,
VALVE ALIGNMENTS, PERSONNEL
ASSIGNMENTS.
Printed 8/2/2017 4:06:04PM *All depths reported in Drillers Depths'
Printed 8/212017 4:06:04PM •AII depths reported in Drillers Depths'
North America - ALASKA - BP
Page 8 of 9
Operation Summary Report
Common Well Name: B-36
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 6/272017 End Date.
X3-018HL-C: (1,055,885.00)
Project: Prudhoe Bay
Site: PB 8 Pad
Rig Name/No.: CDR-2
Spud Data/Tme: 4/30/1996 12:00:OOAM
Rig Release:
Rig Contractor NABORS ALASKA DRILLING INC.
BPUOI: USA00000626
Active datum: KB @76.91 usft (above Mean Sea Levey
Date
From -To Him
Task
Code
NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
10:00 - 12:15 2.25
CEMT P 13,702.00 RUNPRD
MIX AND PUMP 37 BBLS OF CEMENT:
-CEMENT WETAT 1015 HRS.
I
-ZERO IN MM ONCE DENSITY =13.5 PPG
- LOAD 31.9 BBLS 15.3 PPG CEMENT IN REEL
- SWAP TO RIG PUMP. CLEANUP LINES TO
SLB UNIT.
PERFORM DISPLACEMENT WITH RIG PUMPS
- DISPLACE CEMENT WITH 8.4 PPG EXHAUST
PILL
- RATE: 1.95 BPM IN, 1.65 BPM OUT
LAUNCH PEE WEE DART AND LINER WIPER
j
PLUG AS FOLLOWS:
- PICK UP TO BREAKOVER+13 FT (13,653' MD)
PER BTT REP, EXPOSE DOGS, SET DOWN AT
13,670' MD (10 FT HIGHER)
- PU: 60 KLBS, SO: 11 KLBS, SET DOWN 10K
TO 1 K ON AT INDICATOR.
- SHIFT LINER WIPER PLUG DOWN, PICK
BACK UP TO 13,655' MD AND SIDE EXHAUST 5
BBLS
- SET DOWN 1OK AT 13,670' MD AND LAUNCH
PEE WEE DART.
- PRESSURE UP ON WIPER PLUG AND ZERO
MM.
- LINER WIPER PLUG SHEARED AT 4100 PSI
(3 BBLS TO SHEAR),
DISPLACE LINER WIPER PLUG
- DISPLACE AT 1.95 BPM, 2400-2700 PSI
- PLUG BUMPED AT 18.6 BBLS, 3460 PSI (18.6
BBLS CALCULATED)
- OPEN BLEEDER AND CHECK FLOATS. GOOD
TEST.
- PRESSURE UP TO 800 PSI ON COIL, PICK UP
AND CONFIRM PRESSURE DROP
- CEMENT IN PLACE: 1207 HRS
- 24 BBLS CEMENT BEHIND PIPE, BASED ON
MANUALSTRAP.
i-
TOTAL LOSSES FROM CEMENT EXIT SHOE
TO CEMENT IN PLACE: 6 BBLS _
12.15 - 15:00 2.75
CEMT P 13,702.00 RUNPRD
PJSM. POOH W/ COILAND LINER RUNNING
ASSEMBLY.
- POOH @ 100 FPM / PUMPING 2.9 BPM
1125 PSI.
- GOOD INDICATION OF CEMENT RETURNS
BOTH FROM SIDE EXHAUST AND AFTER
BUMPING PLUG AND STINGING OUT PRIOR
TO POOH.
- -
POOH TO 2520'.
15:00 - 16:15 1.25
DISPL P 13,702.00 POST
PJSM W/ LITTLE RED.
- RIG UP LITTLE RED AND CHECK VALVE
ALIGNMENT.
- REVIEWED NABORS PROCEDURE AND
PRESSURE CROSS CHECK LIST.
- PUMP (40) BBLS DIESEL DOWN COIL @ 2
BPM W/ LITTLE RED.
16:15 - 1730 125
DISPL P 13,702.00 POST
PJSM. POOH LAYING IN DIESEL FREEZE
PROTECT.
Printed 8/212017 4:06:04PM •AII depths reported in Drillers Depths'
North America - ALASKA - BP Page 9 of 9
Operation Summary Report
Common Well Name: 8-36 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 6/27/2017 End Date: X3-018HL-C: (1,055,885.00)
I
Project: Prudhoe Bay Site: PB B Pad
Rig Name/No.: CDR -2 Spud Date/time: 4/30/1996 12:00 OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC. BPUDI: USA00000626
Active datum: KB 076.91 usft (above Mean Sea Level)
Data
From -To
Hrs Task
Code
NPT
Total Depth
Phase Description of Operations
_ (hr)
2.00 DISPL
(usft)
17:30 - 19:30
P
13,702.00
RUNPRD
I MONITOR WELL FOR 10 MIN AT BHA, STATIC.
LAY DOWN PH6 AND 7 JTS OF DRILL
COLLARS.
LAY DOWN SELRT RUNNING TOOLS,
RECOVER 5/8" BALL.
CLOSE MASTER VALVE.
19:30 - 21:00 1.50 DISPL
P
13,702.00
POST
_
PJSM WITH HES N2 CREW AND RIG CREW
FOR PUMPING NITROGEN.
INSTALL NOZZLE, MAKE UP TO WELL.
PUMP FRESH WATER AND MEOH AHEAD OF
THE N2.
COOL DOWN N2 UNIT.
WSLAND N2 SUPERVISOR PERFORM
PRESSURE XCHECK VERIFICCATION PRIOR
TO PT OF LINES.
P
13,702.00
POST
PURGE REEL WITH N2.
21:00 - 0000 3.00 DISPL
PUMP 2,000 SCFM FOR 15 MIN.
ALLOW PRESSURE TO BLEED OFF, PURGE
SURFACE LINES.
GREASE PLUG VALVES THAT SAW
NITROGEN.
_
_
PREP TO REMOVE IRON FROM REEL
POST
_
PERFORM LEAK TIGHT TEST ON SWAB AND
7/1/2017 00:00 - 0300 3.00 DISPL
P
13,702.00
MASTER VALVES TO PREPARE FOR
REMOVING BOPS.
REMOVE 1502 IRON FROM INSIDE REEL.
REMOVE COUNTERS FROM INJECTORAND
REEL.
INSTALL CT GRAPPLE.
CONDUCT PJSM FOR UNSTABBING CT.
03:00 - 07:30
4.50
DISPL
P
13,702.00
POST UNSTAB PIPE FROM INJECTOR, ROLL IT
BACK TO REELAND SECURE ITATTHE REEL.
07:30 - 08:30
1.00
DISPL
P
13,702.00
POST CONTINUE TO CLEAN PITS AND PREP FOR
NIPPLE DOWN.
08:30 - 10:00
1.50 DISPL
P
13,702.00
POST PJSM. NIPPLE DOWN DOPE.
- FILLTREE W/ DIESEL, N/U TREE CAP.
- LEAK TIGHT TEST ON TREE CAP AGAINST
SWAB.
- PT 250 / 3500 PSI, OK
- SECURE WELL RIG RELEASED @ 10:00 HRS.
- ALL FURTHER ENTRIES FOR TODAY ON THE
2017 COR2 MAINTENANCE REPORT. THE RIG
WILL STOP AT PEAK YARD FOR ONE DAY OF
MAINTENANCE BEFORE PROCEEDING ON TO
12-03A.
PnMed 8/212017 4.06 04PM *At depths reported in Drillers Depths'
T/1/0= Vac/0/200 Post CDR2. Set 4" H TWC #429 @ 125". R/D 4" CDR tree. Install 4"
CIW Upper production tree. Torqued to API Specs. PT'd Upper Tree against MV. Low
300psi, High 5000psi.(Passed). Pulled 4" H TWC #429 @125 ". Installed tree cap plug &
7/1/2017
PTd to 500psi. (Passed). RDMO. *** Job Complete*** See log for details. FWHP=
CTU #14 -1.75" CT (DrifURPM/Pert)
MIRU. Start 7 -day BOP Test.
7/4/2017
***Job Continued on WSR 07/05/17***
CTU #14 - 1.75" CT (Drif /RPM/Perf)
**"Job Continued from WSR 07/04/17***
Complete 7 -day BOP Test. Liner Lap Test FAILED (Post Rig). TWO = 0/42/206, temp =
SI. Max applied pressure = 2400 psi. Target pressure = 2160 psi. Obtained a LLR of 9.5
gpm @ 2015 psi.
MU and RIH with 2.25" DJN drift BHA. Tag Bottom @ 13629' do / @ 13615' up. Stop and
paint Flag @ 13564POOH. MU and RIH with Baker RPM tools and tag lightly on btm @
13626'E and log from compression up to 10200'@ 20 FPM. Perform repeat pass from
11550'- 11350'. POOH. Download log data and make (+) 37' correction to be on depth
with reference log: Baker MWD GR on 07/27/17. Cut 100' of pipe. Stack down change
packoffs.
7/5/2017
***Job continued on WSR 07/06/17***
CTU #14 - 1.75" CT (Drift/RPM/Pert)
***Job Continued from WSR 07/05/17***
MU and RIH with 20' of 2" Millenium Perf Guns. Perforate 13,553-13,573'. POOH. FP well
with 30bbls of 50/50 methanol. Pump 10bbl of CONQOR 303A corrosion inhibitor in 1.75"
coil -reel #5849 (pre pipe swap to 2"). Load 1/2" foam pig, displace coil to N2.
7/6/2017 1
***Job Complete***
p
North America - ALASKA - BP
Prudhoe Bay
PB B Pad
B-36
B -36A
500292266701
Design: B -36A
Final Survey Report
28 June, 2017
riFag
BAKER
HUGHES
%0+41"s by
Company: North America - ALASKA - BP
Project: Prudhoe Bay
Site: PB B Pad
Well: 8-36
Wellbore: B -36A
Design: B -36A
BP
Final Survey Report
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
WE am
RAWER
HUGHES
Wall B-36
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
True
Minimum Curvature
EDM RSK-Alaska PROD -ANCP1
Project Prudhoe Bay, GPB, PRUDHOE BAY
Map System: Alaska NAD27 State Plane Zones
System Datum:
Mean Sea Level
Geo Datum: NAD27' OGP-Use AK [4267°15864]
Using Well Reference Point
-
Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734°7586,
Using geodetic scale factor
Site PS B Pad, TR -11-14
Site Position:
Northing:
5,946,440.220 usft Latitude:
70° 15'15' 36.4
From: Map
Easting:
662,094.050 usft Longitude:
148° 41' 22.843 W
Position Uncertainty: 0.00 usft
Slot Radius:
0.000 in Grid Convergence:
1.23 °
-
WON 8 -36,B -36__
WON Position +N/ -S 0.00 usft
Northing:
5,950,114.740 usft
Latitude:
70' 16'12.259 N
+EJ -W 0.00 usft
Easting:
663,733.740 usft
Longitude:
148° 40'32.816 W
Position Uncertainty 0.00 usft
Wellhead Elevation: 43.23 usft
Ground Level:
41.33 usft
Wellbore B -36A
Magnetic$ Model Name Sample Date
Declination
Dip Angle Field Strength
(ron
BGGM2016 7/1/2017
17.81
80.99 57,547
-
Design B -36A
— _-
- - - -
Audit Notes:
Version: Phase: ACTUAL
Tie On DspN: 11,524.60
Vertical Section: Depth From (TVD)
+NI -S
+H -W Direction
(usft)
(usft)
(usft) r)
33.68
0.00
0.00 74.94
6/282017 2: 17:30PM Page 2
COMPASS 5000.1 Build 81D
,Z
by
5101W
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB B Pad
Well:
B-36
Wellbore:
B -36A
Design:
B -36A
Survey Program
Date 6/28/2017
From
TO
(usft)
(usft) Survey (Wellbore)
100.00
6,050.00 Survey #2 (B-36)
6,107.49
11,524.60 1 : MWD - Standard (8-36)
11,547.00
13,656.40 BHI CTK MWD (B -36A)
BP
FEARS
Final Survey Report
BAKER
MWD
HUGHES
Local Co-ordinate Reference:
Well B-36
TVD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
MD Reference:
ORIG KELLY BUSHING Q 76.91 usft (DOYON 16)
Norm Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K-Alaska PROD -ANCP1
Tool Name
Description
GYD-GC-MS
Gyrodala gyrocompassing m/s
MWD
MWD -Standard
MWD
MWD - Standard
Survey
MD
Inc
AN (azimuth)
TVD
TVDSS
NIS
E W
Nothing
Easting
DLeg
V. Sec
(usft)
(°)
0
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100uaR)
(usft)
33.68
0.00
0.00
33.68
43.23
0.00
0.00
5,950,114.740
663,733.740
0.00
0.00
100.00
0.12
158.07
100.00
23.09
-0.06
0.03
5,950,114.676
663,733.767
0.18
0.01
110.00
0.11
158.30
110.00
33.09
-0.08
0.03
5,950,114.657
663,733.775
0.06
0.01
20"
200.00
0.06
162.42
200.00
123.09
-0.21
0.08
5,950,114.530
663,733.825
0.08
0.02
300.00
0.08
101.96
300.00
223.09
-0.28
0.16
5,950,114.468
663,733.911
0.07
0.09
400.00
0.37
88.91
400.00
323.09
-0.27
0.56
5,950,114.479
663,734.301
0.29
0.47
500.00
1.88
119.32
499.98
423.07
-1.06
2.31
5,950,113.732
863,736.071
1.58
1.95
600.00
3.47
118.84
599.87
522.96
-3.32
6.39
5,950,111.558
663,740.200
1.59
5.31
-�
700.00
4.15
116.59
699.64
622.73
-6.40
12.28
5,950,108.608
863,746.152
0.70
10.19
750.00
4.52
111.92
749.50
672.59
-7.95
15.72
5,950,107.138
863,749.630
1.02
13.12
800.00
4.99
108.54
799.33
722.42
-9.37
19.61
5,950,105.796
663,753.549
1.09
16.50
850.00
5.10
109.78
849.13
772.22
-10.82
23.76
5,950,104.443
663,757.733
0.31
20.14
900.00
5.42
106.98
898.92
822.01
-12.26
28.11
5,950,103.096
663,762.112
0.82
23.96
950.00
5.59
110.10
948.89
871.78
-13.79
32.66
5,950,101.669
663,766.689
0.69
27.96
1,000.00
5.98
114.56
996.44
921.53
-15.70
37.32
5,950,099.852
663,771.386
1.19
31.95
1,050.00
6.21
113.34
1,048.16
971.25
-17.86
42.17
5,950,097.804
663,776.283
0.53
36.08
1,100.00
6.77
121.35
1,097.84
1,020.93
-20.46
47.17
5,950,095.309
663,781.338
2.13
40.23
1,150.00
7.52
117.41
1,147.45
1,070.54
-23.50
52.59
5,950,092.388
663,786.824
1.79
44.68
1,200.00
8.19
122.90
1,196.98
1,120.07
-28.94
58.48
5,950,089.077
663,792.792
2.01
49.47
1,250.00
9.91
119.36
1,248.36
1,169.45
-30.99
65.22
5,950,085.180
663,799618
3.61
54.93
6262017 2'17.30PM
Page 3
COMPASS
5000.1 Build 81D
Survey
MD
Inc
AN (mlinuth)
as
ko♦o by
NIS
Final Survrvey Report
B4KER
Easting
DLeg
V. Sac
HUGHES
Company:
NOM America - ALASKA - BP
Local Cc -ordinate Reference:
Well B-36
Protect
Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
Site:
PB B Pad
MD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Well:
B-36
North Reference:
True
Wellbore:
B -36A
Survey Calculation Method:
Minimum Curvature
Design:
B -36A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
AN (mlinuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sac
(usft)
(1)
(')
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usfq
(usft)
1,300.00
11.08
119.06
1,295.52
1,218.61
-35.43
73.17
5,950,080.911
663,807.663
2.34
61.45
1,350.00
12.15
119.03
1,344.49
1,267.58
-40.32
81.97
5,950,076.217
863,816.567
2.14
68.68
1,400.00
13.34
115.85
1,393.26
1,316.35
-45.39
91.77
5,950,071.363
663,826.466
2.76
76.82
1,450.00
14.06
114.02
1,441.84
1,364.93
-50.37
102.51
5,950,066.611
663,837.310
1.68
85.90
1,500.00
14.74
112.20
1,490.27
1,413.36
-55.25
113.94
5,950,061.985
663,848.850
1.63
95.67
1,550.00
14.75
109.00
1,538.62
1,461.71
-59.73
125.85
5,950,057.770
663,860.851
1.63
106.01
1,600.00
15.60
107.18
1,586.88
1,509.97
-63.78
138.29
5,950,053.984
663,873.377
1.95
116.97
1,850.00
15.94
106.46
1,635.00
1,558.09
-67.72
151.30
5,950,050.336
663,886.466
0.78
128.51
1,700.00
16.41
107.13
1,683.02
1,606.11
-71.74
164.63
5,950,046.602
663,899.884
1.01
140.34
1,750.00
16.87
100.46
1,730.93
1,654.02
-75.14
178.52
5,950,043.507
663,913.839
3.93
152.86
1,800.00
16.98
100.58
1,778.76
1,701.85
-77.80
192.83
5,950,041.162
663,928.203
0.23
165.99
1,850.00
17.77
101.50
1,828.48
1,749.57
-80.66
207.48
5,950,036.620
663,942.915
1.67
179.40
1,900.00
19.47
96.97
1,873.86
1,796.95
-83.19
223.23
5,950,036.431
663,958.715
4.46
193.95
1,950.00
22.23
91.39
1,920.59
1,843.811
-64.43
240.97
5,950,035.576
663,976.469
6.79
210.75
2,000.00
23.08
91.21
1,966.73
1,889.82
-64.87
280.22
5,950,035.558
663,995.726
1.71
229.23
_
2,050.00
22.08
90.56
2,012.90
1,935.99
-85.17
279.42
5,950,035.677
664,014.923
2.06
247.69
2,100.00
21.64
90.25
2,059.30
1,982.39
-85.30
298.03
5,950,035.950
664,033.536
0.91
265.63
2,150.00
22.79
90.29
2,105.59
2,028.68
-85.39
316.94
5,950,036.272
664,052.436
2.30
283.86
2,200.00
25.05
90.45
2,151.29
2,074.38
-85.52
337.21
5,950,036.581
664,072.704
4.52
303.40
2,250.00
25.90
90.31
2,196.43
2,119.52
-85.66
358.71
5,950,036.906
664,094.206
1.70
324.13
2,300.00
26.05
90.84
2,241.38
2,164.47
-85.88
380.61
5,950,037.163
664,116.101
0.55
345.22
2,350.00
25.47
91.45
2,286.41
2,209.50
-66.32
402.34
5,950,037.203
664,137.829
1.26
366.09
2,400.00
25.58
92.04
2,331.53
2,254.62
-86.97
423.87
5,950,037.016
664,159.372
0.55
386.71
2,450.00
25.06
92.48
2,376.73
2,299.82
-87.81
445.24
5,950,036.639
664,180.751
1.11
407.13
2,500.00
25.53
93.83
2,421.94
2,345.03
-88.99
466.57
5,950,035.925
664,202.100
1.49
427.42
2,550.00
26.33
95.80
2,466.90
2,389.99
-90.83
488.35
5,950,034.559
664,223.916
2.35
447.98
2,600.00
27.02
96.04
2,511.58
2,434.67
-93.15
510.68
5,950,032.730
664,248.286
1.40
468.93
6/28/2017 2.17'30PM Page 4 COMPASS 5000.1 Build BID
BP I/.as
StiNa2 p Final Survey Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Project:
Prudhoe Bay
TVD Reference:
Site:
PB B Pad
MD Reference:
Well:
8-36
North Reference:
Wellbore:
B -38A
Survey Calculation Method:
Design:
B -36A
Database:
Survey
MD Inc
(usft) (')
2,650.00
2,700.00
2,750.00
2,800.00
2,850.00
2,900.00
2,950.00
3,000.00
3,050.00
3,100.00
3,150.00
3,200.00
3,250.00
3,300.00
3,350.00
3,400.00
3,450.00
3,500.00
3,550.00
3,600.00
3,649.00
9 318'
3,650.00
3,700.00
3,750.00
3,800.00
3,850.00
Well 8-36
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
True
Minimum Curvature
EDM RSK- Alaska PROD -ANCPI �IIII
V. Sac
(usft)
490.99
514.43
538.82
563.77
588.96
614.67
641.40
669.27
697.98
727.48
757.90
789.32
821.63
854.36
887.30 -
920.24
953.33
987.09
1,021.24
1,056.28
1,090.55
43.27
Aar (azimuth)
TVD
TVDSS
NIS
ENO
Northing
Easting
DLeg
1,091.23
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
('1100usit)
29.28
95.35
2,555.66
2,478.75
-95.49
534.15
5,950,030.900
664,269.801
4.56
30.53
94.25
2,599.01
2,522.10
-97.58
558.99
5,950,029.353
664,294.678
2.74
31.49
93.23
2,641.86
2,564.95
-99.25
584.69
6,950,028.236
664,320.410
2.19
31.59
91.58
2,684.47
2,607.56
-100.35
610,82
5,950,027.707
664,346.555
1.74
31.78
91.15
2,727.02
2,650.11
-100.98
637.07
5,950,027.653
664,372.816
0.59
32.98
91.14
2,769.25
2,692.34
-101.51
663.84
5,950,027.701
664,399.590
2.40
34.60
90.70
2,810.80
2,733.89
-101.95
691.65
5,950,027.862
664,427.394
3.28
36.13
90.39
2,851.57
2,774.66
-102.23
720.58
5,950,028.217
664,456.328
3.08
36.73
89.01
2,891.80
2,814.89
-102.07
750.27
5,950,029.021
664,486.005
2.03
37.91
87.53
2,931.56
2,854.65
-101.15
780.57
5,950,030.600
664,518.273
2.96
39.04
86.48
2,970.71
2,893.80
-99.52
811.64
5,950,032.904
664,547.292
2.61
40.56
85.39
3,009.12
2,932.21
-97.25
843.56
5,950,035.872
664,579.156
3.34
41.40
84.06
3,046.87
2,969.86
-94.23
876.21
5,950,039.598
664,611.729
2.42
41.50
82.80
3,084.35
3,007.44
-90.44
909.09
5,950,044.100
664,644.516
1.68
41.82
82.34
3,121.70
3,044.79
-86.14
942.04
5,950,049.113
664,677.368
0.89
4138
82.05
3,159.09
3,082.18
-81.64
974.93
5,950,054.335
664,710.149
0.96
42.27
81.90
3,196.35
3,119.44
-76.98
1,007.95
5,950,059.707
664,743.054
1.79
43.46
81.85
3,233.00
3,156.09
-72.17
1,041.62
5,950,065.245
664,776.610
2.38
43.51
82.03
3,269.28
3,192.37
-67.35
1,075.69
5,950,070.809
664,810.563
0.27
46.38
82.36
3,304.66
3,227.75
-62.56
1,110.68
5,950,076.363
664,845.439
5.76
43.33
82.24
3,339.39
3,262.48
-57.93
1,144.92
5,950,081.735
664,879.574
6.22
43.27
82.24
3,340.12
3,263.21
-57.84
1,145.60
5,950,081.842
664,880.251
6.22
1,091.23
44.05
82.36
3,376.29
3,299.38
-53.21
1,179.81
5,950,087.210
684,914.347
1.57
1,125.46
43.49
82.59
3,412.40
3,335.49
-48.68
1,214.10
5,950,092.484
664,948.528
1.16
1,159.75
43.56
82.57
3,448.65
3,371.74
-44.23
1,248.25
5,950,097.672
664,982.566
0.14
1,193.88
43.23
79.95
3,484.99
3,408.08
-39.02
1,282.19
5,950,103.625
685,018.389
3.66
1,228.02
6/2112017 2,17:3OPM Page 5 COMPASS 5000.1 Build 81D
by BP
Final Survey Report
Company:
North America - ALASKA - BP
Project
Prudhoe Bay
Sire:
PB 8 Pad
Well:
B-36
Wellbore:
B -36A
Design:
B -36A
Survey._.
(usft)
WIPARI
BAKER
HUGHES
Local Co-ordinate Reference:
Well 8-36
TVD Reference:
ORIG KELLY BUSHING Q 76.9lusft (DOYON 16)
MD Reference:
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
North Reference:
Two
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K- Alaska PROD - ANCP1
MD
Inc
AN(azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°It00usft)
3,900.00
43.20
79.20
3,521.43
3,444.52
-32.82
1,315.86
5,950,110.551
665,049.915
1.03
3,950.00
42.75
77.41
3,558.01
3,481.10
-25.92
1,349.24
5,950,118.181
665,083.129
2.60
4,000.00
42.21
77.20
3,594.89
3,517.98
-18.50
1,382.18
5,950,126.315
665,115.898
1.12
4,050.00
42.72
77.29
3,631.77
3,554.86
-11.04
1,415.10
5,950,134.482
665,148.650
1.03
4,100.00
42.44
77.55
3,688.59
3,591.68
-3.67
1,448.12
5,950,142.567
665,181.498
0.66
4,150.00
43.78
78.00
3,705.09
3,628.18
3.56
1,481.52
5,950,150.525
665,214.725
2.75
4,200.00
43.12
78.19
3,741.39
3,664.48
10.65
1,515.16
5,950,158.348
665,248.207
1.35
4,250.00
43.11
78.35
3,777.89
3,700.98
17.60
1,548.62
5,950,166.021
665,281.505
0.22
4,300.00
43.06
78.80
3,814.40
3,737.49
24.37
1,582.10
5,950,173.513
665,314.825
0.62
4,350.00
43.28
79.04
3,850.87
3,773.96
30.94
1,615.67
5,950,180.815
665,348.242
0.55
4,400.00
42.91
78.80
3,887.38
3,810.47
37.50
1,649.19
5,950,188.107
665,381.613
0.81
4,450.00
43.16
78.70
3,923.93
3,847.02
44.16
1,682.66
5,950,195.490
665,414.924
0.52
4,500.00
43.03
78.78
3,960.44
3,883.53
50.83
1,716.16
5,950,202.887
665,448.272
0.28
4,550.00
42.95
78.97
3,997.01
3,920.10
57.41
1,749.62
5,950,210.191
665,481.571
0.30
4,800.00
42.78
79.18
4,033.66
3,956.75
63.86
1,783.01
5,950,217.362
665,514.818
0.44
4,650.00
42.34
79.18
4,070.49
3,993.58
70.20
1,816.23
5,950,224.431
665,547.886
0.88
4,700.00
42.36
79.20
4,107.44
4,030.53
76.52
1,849.31
5,950,231.466
665,580.824
0.05
4,750.00
41.75
79.30
4,144.57
4,067.66
82.77
1,882.22
5,950,238.427
665,613.582
1.23
4,800.00
42.07
79.52
4,181.77
4,104.86
86.91
1,915.05
5,950,245.277
665,646.268
0.70
4,850.00
41.49
79.76
4,219.06
4,142.15
94.90
1,947.82
5,950,251.979
665,678.898
1.20
4,900.00
42.38
80.18
4,256.26
4,179.35
100.72
1,980.72
5,950,258.512
665,711.665
1.87
4,950.00
42.58
80.45
4,293.13
4,216.22
106.40
2,014.01
5,950,264.915
665,744.816
0.54
5,000.00
42.39
80.49
4,330.00
4,253.09
111.99
2,047.31
5,950,271.228
665,777.988
0.38
5,050.00
42.14
80.72
4,367.01
4,290.10
117.48
2,080.49
5,950,277.438
665,811.035
0.59
5,100.00
41.56
81.18
4,404.25
4,327.34
122.73
2,113.43
5,950,283.401
665,843.854
1.31
5,150.00
41.91
81.03
4,441.56
4,364.65
127.87
2,146.32
5,950,289.261
665,878.616
0.73
5,200.00.
42.87
80.79
4,478.49
4,401.58
133.20
2,179.60
5,950,295.310
665,909.775
1.95
I
V. Sec
(usft)
1,262.14
1,296.16
1,329.90
1,363.63
1,397.43
1,431.56
1,465.89
1,500.01
1,534.09
1,568.22
1,602.30
1,636.34
1,670.43
1,704.44
1,738.37 --
1,772.09
1,805.68
1,839.08
1,872.38
1,905.58
1,938.86
1,972.48
2,006.09
2,039.56
2,072.73
2,105.82
2,139.35
6/282017 2:17:30PM Page 6 COMPASS 50001 Build 61D
BID
r Final Survey Report BMER
" HUGHES
Company:
North America -ALASKA -BP
Local Co-ordinate Reference:
Well B-36
Project:
Prudhoe Bey
TVD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Site:
PB B Pad
MD Reference:
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
Well:
8-36
North Reference:
True
Wellbore:
B -36A
Survey Calculation Method:
Minimum Curvature
Design:
B -36A
Database:
EDM RSK-Alaska PROD -ANCP1
Survey
MD
Inc
Azl (azimuth)
TVD
TVDSS
NIS
EfW
Northing
Eating
DL99
V. Sec
(usft)
0
1°I
lush)
(usft)
(usft)
(usft)
(usft)
(usft)
(9100usft)
(usft)
5,250.00
43.55
80.62
4,514.93
4,438.02
138.73
2,213.38
5,950,301.573
665,943.428
1.38
2,173.41
5,300.00
43.07
80.67
4,551.31
4,474.40
144.30
2,247.22
5,950,307.882
665,977.138
0.96
2,207.54
5,350.00
43.23
80.80
4,587.79
4,510.88
149.81
2,280.97
5,950,314.120
666,010.757
0.37
2,241.56
5,400.00
43.23
81.16
4,624.22
4,547.31
155.18
2,314.80
5,950,320.223
666,044.453
0.49
2,275.61
5,450.00
42.89
81.63
4,660.76
4,583.85
160.29
2,348.55
5,950,326.064
666,078.085
0.94
2,309.54
5,500.00
42.49
82.46
4,697.51
4,620.60
164.98
2,382.13
5,950,331.486
666,111.547
1.38
2,343.18
5,550.00
42.33
82.71
4,734.42
4,857.51
169.33
2,415.56
5,950,336.564
666,144.882
0.46
2,376.60
5,600.00
42.56
82.40
4,771.32
4,694.41
173.70
2,449.02
5,950,341.663
666,178.236
0.82
2,410.04
5,650.00
43.53
81.47
4,807.86
4,730.95
178.49
2,482.81
5,950,347.187
666,211.911
2.32
2,443.92
5,700.00
43.58
81.69
4,844.10
4,767.19
183.54
2,516.69
5,950,352.972
666,245.872
0.32
2,478.14
5,750.00
43.36
82.06
4,860.38
4,803.47
188.40
2,550.95
5,950,358.573
666,279.809
0.67
2,512.29
5,800.00
43.82
81.49
4,916.60
4,839.69
193.33
2,585.07
5,950,364.246
666,313.811
1.21
2,546.52
5,850,00
43.59
79.69
4,952.75
4,875.84
198.98
2,619.15
5,950,370.632
666,347.757
2.53
2,580.89
5,900.00
43.68
80.11
4,988.93
4,912.02
205.03
2,653.12
5,950,377.420
666,381.583
0.61
2,615.27
5,950.00
44.65
81.12
5,024.80
4,947.89
210.71
2,687.48
5,950,383.844
666,415.819
2.40
2,649.93
6,000.00
45.14
82.49
5,060.22
4,983.31
215.74
2,722.41
5,950,389.630
666,450.627
2.17
2,684.97
6,050.00
45.18
82.90
5,095.48
5,018.57
220.24
2,757.58
5,950,394.902
666,485.684
0.59
2,720.09
6,107.49
46.60
81.80
5,135.49
5,058.58
225.74
2,798.49
5,950,401.289
666,526.460
2.83
2,781.03
6,202.96
46.10
81.70
5,201.39
5,124.48
235.66
2,866.85
5,950,412.686
666,594.588
0.53
2,829.62
6,298.62
45.40
78.50
5,268.15
5,191.24
247.42
2,934.34
5,950,425.917
666,661.796
2.51
2,897.84
6,393.20
46.00
79.20
5,334.21
5,257.30
260.51
3,000.75
5,950,440.445
666,727.903
0.83
2,965.37
6,489.02
46.20
78.20
5,400.65
5,323.74
274.04
3,068.45
5,950,455.443
666,795.291
0.78
3,034.27
6,584.86
45.40
75.60
5,467.47
5,390.56
289.80
3,135.36
5,950,472.453
666,861.843
2.12
3,102.92
6,680.64
44.40
74.50
5,535.31
5,458.40
307.03
3,200.68
5,950,491.304
666,926.762
1.32
3,170.53
6,776.28
42.70
74.00
5,604.63
5,527.72
324.92
3,264.10
5,950,510.559
666,989.773
1.81
3,236.42
6,871.63
42.40
74.50
5,675.02
5,598.11
342.46
3,326.29
5,950,529.446
667,051.560
0.47
3,301.02
6,967.59
42.30
74.00
5,745.79
5,668.88
359.97
3,388.37
5,950,548.302
667,113.247
0.37
3,365.53
6128/2017 2:17.30PM Page 7 COMPASS 5000.1 Build 810
ii
BP
FS as
�
by
Final Survey Report
BAKER
HUGHES
Company: North Amenca-ALASKA-BP
Local Co-ordinate Reference:
Well B-36
Project Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
Site: PB B Pad
MD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Well: B-36
North Reference:
True
Wellbore: B -36A
Survey Calculation Method:
Minimum Curvature
Design: B -36A
Database:
EDM RSK- Alaska PROD -ANCPI
Survey
MD
Inc
Azi (azimuth)
ND
NDSB
NIS
FJW
Northing
Easting
DLag
V. Sec
(usft)
(°)
1°I
(usft)
(usft)
(usft)
(usft)
(usft
(usft)
(°1100uaf)
(usft)
7,063.40
42.30
73.60
5,816.68
5,739.75
377.95
3,450.30
5,950,567.633
667,174.758
0.28
3,430.00
7,137.88
42.40
74.30
5,871.70
5,794.79
391.83
3,498.51
5,950,582.549
667,222.659
0.65
3,480.16
7,230.84
42.40
75.70
5,940.35
5,863.44
408.05
3,559.06
5,950,600.083
667,282.832
1.02
3,542.84
7,326.46
42.40
77.00
6,010.96
5,934.05
423.26
3,621.71
5,950,616.657
667,345.134
0.92
3,607.30
7,422.05
42.50
79.10
6,081.50
6,004.59
436.62
3,684.82
5,950,631.382
667,407.937
1.49
3,671.71
7,517.67
42.10
79.60
6,152.37
6,075.46
448.54
3,748.20
5,950,644.676
667,471.035
0.55
3,736.01
7,614.01
41.80
79.80
6,223.87
6,146.96
460.03
3,811.43
5,950,657.539
667,533.998
0.34
3,800.06
7,708.33
42.90
80.10
6,293.58
6,216.67
471.12
3,874.00
5,950,669.983
667,596.301
1.19
3,863.35
7,804.11
43.00
79.60
6,363.68
6,286.77
482.62
3,938.23
5,950,682.878
667,660.270
0.37
3,928.37
7,898.85
42.90
79.60
6,433.03
6,356.12
494.27
4,001.73
5,950,695.908
667,723.489
0.11
3,992.71
7,995.28
42.60
80.10
6,503.84
6,426.93
505.81
4,066.16
5,950,708.842
667,787.650
0.47
4,057.93
8,089.95
42.10
79.40
6,573.80
6,496.69
517.15
4,128.91
5,950,721.550
667,850.140
0.73
4,121.48
8,163.96
41.10
78.90
6,644.10
6,567.19
528.90
4,190.21
5,950,734.626
667,911.165
1.12
4,183.72
8,280.93
40.80
78.70
6,717.34
6,640.43
541.24
4,252.56
5,950,748.323
667,973.221
0.34
4,247.13
8,376.10
41.30
78.90
6,789.11
6,712.20
553.38
4,313.87
5,950,761.791
668,034.248
0.54
4,309.49
8,471.71
41.60
79.60
6,860.78
6,783.87
565.19
4,376.05
5,950,774.944
668,098.151
0.58
4,372.60
8,567.02
42.60
80.10
6,931.49
6,854.58
576.44
4,438.94
5,950,787.567
666,158.785
1.11
4,436.26
8,662.66
43.50
81.20
7,001.36
6,924.47
587.05
4,503.36
5,950,799.566
668,222.953
1.23
4,501.22
8,758.51
43.10
81.00
7,071.14
6,994.23
597.21
4,568.31
5,950,811.145
668,287.856
0.44
4,568.58
8,654.50
42.70
81.40
7,141.46
7,064.55
607.21
4,632.88
5,950,822.544
668,351.991
0.50
4,631.53
8,949.28
42.30
81.90
7,211.34
7,134.43
616.51
4,696.23
5,950,833.219
668,415.122
0.55
4,695.12
9,045.13
41.60
80.10
7,282.63
7,205.72
626.53
4,759.51
5,950,844.608
668,478.165
1.45
4,758.83
9,140.85
41.30
81.00
7,354.37
7,277.46
636.93
4,822.01
5,950,856.369
668,540.422
0.70
4,821.89
9,235.03
40.80
79.10
7,425.40
7,348.49
647.61
4,882.93
5,950,868.372
668,601.085
1.43
4,883.49
9,331.31
41.70
78.70
7,497.78
7,420.87
659.84
4,945.22
5,950,881.946
668,663.093
0.97
4,946.82
9,421.19
41.20
78.40
7,565.15
7,488.24
671.65
5,003.53
5,950,895.022
668,721.131
0.60
5,006.20
9,522.31
41.20
78.00
7,641.24
7,584.33
685.27
5,068.73
5,950,910.056
668,786.014
0.26
5,072.70
6/282017 2.17.30PM Page 8 COMPASS 5000 1 Build 81O
BP
IER
by
Final
Survey Report
BAKER
HUGHES
Company: North America
-ALASKA - BP
Local Co-ordinate Reference:
Well B-36
Project: Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING
@ 76.91usft
(DOYON 16)
Site: PB B Pad
MD Reference:
ORIG KELLY BUSHING
@ 76.91usft
(DOYON 16)
Well: B-36
North Reference:
True
Wellbore: B -36A
Survey Calculation Method:
Minimum Curvature
Design: B -36A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD Inc
AN (ulmuth)
TVD
iVDSS
NIS
EIW
Northing
Pwting
DLog
V. Sec
(usft) 1°I
1'1
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
('1100USR)
(usft)
9,617.08
42.20
78.70
7,712.00
7,635.09
697.99
5,130.48
5,950,924.122
668,847.462
1.16
5,135.63
9,712.25
42.80
78.20
7,782.17
7,705.26
710.87
5,193.48
5,950,938.365
668,910.163
0.72
5,199.81
9,807.98
41.90
78.20
7,852.91
7,776.00
724.06
5,256.60
5,950,952.920
668,972.976
0.94
5,264.19
9,903.58
41.20
79.10
7,924.46
7,847.55
736.54
5,318.76
5,950,966.751
669,034.851
0.96
5,327.46
9,998.99
41.80
80.30
7,995.91
7,919.00
747.84
5,380.96
5,950,979.400
669,096.786
1.04
5,390.46
10,094.94
42.80
80.80
8,066.88
7,989.97
758.44
5,444.66
5,950,991.382
669,160.235
1.10
5,454.72
10,190.36
42.30
81.00
8,137.18
8,060.27
768.64
5,508.37
5,951,002.970
669,223.707
0.54
5,518.90
10,285.97
41.10
81.20
8,208.56
8,131.65
778.48
5,571.21
5,951,014.175
669,286.309
1.26
5,582.14
10,381.59
41.40
81.20
8,280.45
8,203.54
788.13
5,633.51
5,951,025.173
669,348.385
0.31
5,644.81
10,477.61
43.20
80.00
8,351.47
8,274.56
798.70
5,697.26
5,951,037.122
669,411.883
2.05
5,709.11
10,572.89
42.50
80.30
8,421.32
8,344.41
809.78
5,761.10
5,951,049.593
669,475.465
0.77
5,773.64
10,669.76
42.50
80.80
8,492.74
8,415.83
820.53
5,825.66
5,951,061.739
669,539.767
0.35
5,838.77
10,748.92
42.80
81.00
8,550.96
8,474.05
829.01
5,878.62
5,951,071.371
669,592.524
0.42
5,892.11
10,798.90
41.90
80.50
8,587.90
8,510.99
834.42
5,911.85
5,951,077.503
669,625.627
1.92
5,925.81
10,823.00
42.34
80.28
8,605.78
8,528.87
837.12
5,927.78
5,951,080.547
669,641.500
1.93
5,941.70
7..
10,831.74
42.50
80.20
8,612.23
8,535.32
838.12
5,933.59
5,951,081.673
669,647.287
1.93
5,947.57
10,862.59
45.30
80.00
8,634.46
8,557.55
841.80
5,954.67
5,951,085.808
669,668.271
9.09
5,968.87
10,892.61
49.30
79.20
8,654.81
8,577.90
845.78
5,976.36
5,951,090.265
669,689.872
13.47
5,990.86
10,922.15
52.40
80.00
8,673.46
8,596.55
849.91
5,998.89
5,951,094.886
669,712.304
10.70
6,013.69
10,954.09
56.40
80.00
8,692.05
8,615.14
854.42
6,024.46
5,951,099.949
669,737.769
12.52
6,039.55
10,985.89
59.10
78.60
8,709.02
8,632.11
859.42
6,050.88
5,951,105.520
669,764.074
9.27
6,066.36
11,017.23
62.60
75.80
8,724.23
8,647.32
865.50
6,077.59
5,951,112.179
669,790.639
14.15
6,093.73
11,048.41
65.60
73.20
8,737.80
8,660.89
873.01
6,104.63
5,951,120.272
669,817.511
11.70
6,121.80
11,081.28
67.50
69.30
8,750.89
8,673.98
882.70
6,133.17
5,951,130.587
669,845.835
12.32
6,151.88
11,110.52
67.90
64.80
8,761.99
8,685.08
893.25
6,158.08
5,951,141.672
669,870.501
14.30
6,178.67
11,145.04
67.20
60.30
8,775.18
8,698.27
907.95
6,186.38
5,951,156.983
669,898.476
12.22
6,209.82
6282017 2:17:30PM
Page 9
COMPASS 50001 Build 81D
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB B Pad
Well:
8-36
Wellbore:
B -36A
Design:
B -36A
Survey
MD I
(usft)
11,182.25
11,214.22
11,245.14
11,276.01
11,306.33
11,337.90
11,369.82
11,401.98
11,425.50
11,463.17
11,494.62
11,524.60
TIP
11,547.00
KOP-TOWS
11,550.00
4112"
11,570.18
Interpolated Azimuth
11,600.30
Interpolated Azimuth
11,630.12
Interpolated Azimuth
11,660.21
11,680.94
11,710.61
11,740.80
11,770.28
BP
HIM
Final Survey Report
BMER
NIS
HUGHES
Local Coordinate Reference:
Well B-36
TVD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 18)
MD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K- Alaska PROD - ANCP1
nc
Azi(azimuth)
ND
TVDSS
NIS
EM
Northing
Eastirg
DLeg
V. Sec
74.70
32.55
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°HOOusft)
(usft)
66.70
54.10
8,789.76
8,712.85
926.48
6,215.14
5,951,176.136
669,926.828
15.39
6,242.41
66.70
53.60
8,802.40
8,725.49
943.80
6,238.85
5,951,193.967
669,950.154
1.44
6,269.80
66.20
52.90
8,814.76
8,737.85
960.76
6,261.57
5,951,211.415
669,972.489
2.63
6,296.14
65.70
53.50
8,827.34
8,750.43
977.65
6,284.14
5,951,228.787
669,994.687
2.40
6,322.33
65.70
53.30
8,839.82
8,762.91
994.13
6,306.32
5,951,245.741
670,016.507
0.60
6,348.03
65.60
52.50
8,852.83
8,775.92
1,011.47
6,329.26
5,951,263.583
670,039.062
2.33
6,374.69
65.70
52.50
8,865.99
8,789.08
1,029.18
6,352.33
5,951,281.783
670,061.741
0.31
6,401.57
65.40
52.20
8,879.30
8,802.39
1,047.06
6,375.51
5,951,300.164
670,084.524
1.26
6,428.60
65.90
51.80
8,889.00
8,812.09
1,060.25
6,392.40
5,951,313.720
670,101.117
2.63
6,448.33
67.20
48.20
8,904.00
8,827.09
1,082.46
6,418.86
5,951,336.501
670,127.090
9.42
6,479.66
70.10
41.80
8,915.53
8,838.62
1,103.30
6,439.68
5,951,357.788
670,147.447
20.94
6,505.17
73.80
36.20
8,924.76
8,847.85
1,125.30
6,457.47
5,951,380.167
670,164.759
21.77
6,528.08
75.21
32.88
8,930.75
8,853.84
1,143.08
6,469.71
5,951,398.207
670,176.803
15.61
6,544.51
74.70
32.55
8,931.52
8,854.61
1,145.52
6,471.27
5,951,400.878
670,178.115
20.00
6,546.66
71.31
30.26
8,937.42
8,860.51
1,161.99
6,481.33
5,951,417.358
670,187.811
20.00
6,560.64
68.56 26.71 8,948.25 8,871.34 1,186.67 6,494.74 5,951,442.328 670,200.680 19.22 6,580.01
63.33 22.99 8,960.88 8,883.97 1,211.17 6,506.10 5,951,467.067 670,211.503 15.65 6,597.34
59.99
18.97
8,975.16
8,898.25
1,235.88
6,515.59
5,951,491.977
670,220.454
16.17
6,612.93
56.33
22.29
8,986.10
8,909.19
1,252.36
6,521.79
5,951,508.585
670,226.286
22.29
6,623.19
59.02
27.59
9,001.97
8,925.06
1,275.07
6,532.37
5,951,531.521
670,236.370
17.60
6,639.31
65.78
32.64
9,015.96
6,939.05
1,298.17
6,545.81
5,951,554.907
670,249.305
26.84
6,658.29
68.60
37.42
9,027.39
8,950.48
1,320.41
6,561.41
5,951,577.474
670,264.417
17.74
6,679.13
6728/2017 2: 1730PM Page 10 COMPASS 5000.1 Build 81D
r'••s BP
bp
.�• Final Survey Report
Company:
North America - ALASKA - BP
Project
Prudhoe Bay
Site:
PB B Pad
Well;
B-36
Wellbore:
B -36A
Design:
B -36A
Survey
I/.a\
HUGHES
Local Coordinate Reference:
Well B-36
TVD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
MD Reference:
ORIG KELLY BUSHING Q 76.91 usft (DOYON 16)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
MD
Inc
AN (mimuth)
TVD
TVDSS
WS
ENV
Northing
Eastlrlg
DLeg
(usft)
rl
1'1
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(1100usf)
11,800.58
71.15
43.41
9,037.82
8,960.91
1,342.05
6,579.85
5,951,599.507
670,282.382
20.38
11,830.22
75.04
48.13
9,046.45
8,969.54
1,361.81
6,600.17
5,951,619.706
670,302.265
20.11
11,860.08
80.22
53.51
9,052.85
8,975.94
1,380.21
6,622.77
5,951,638.594
670,324.458
24.71
11,890.44
87.36
55.85
9,056.13
8,979.22
1,397.65
6,647.38
5,951,656.558
670,348.683
24.73
11,920.06
92.49
59.62
9,056.17
8,979.26
1,413.45
6,672.41
5,951,672.901
670,373.365
21.49
11,949.92
99.47
62.68
9,053.06
6,976.15
1,427.77
6,698.40
5,951,687.786
670,399.035
25.50
11,981.53
98.46
68.01
9,048.13
8,971.22
1,440.79
6,726.77
5,951,701.417
670,427.110
16.96
12,016.15
91.29
71.16
9,045.19
8,968.28
1,452.81
6,759.08
5,951,714.134
670,459.144
22.61
12,041.06
91.32
74.91
9,044.62
8,967.71
1,460.08
6,782.89
5,951,721.915
670,482.794
15.05
12,070.75
88.62
77.84
9,044.64
8,967.73
1,467.07
6,811.74
5,951,729.533
670,511.482
13.42
12,101.10
88.77
83.79
9,045.33
8,968.42
1,471.91
6,841.68
5,951,735.024
670,541.307
19.61
12,130.68
90.46
82.94
9,045.53
8,968.62
1,475.33
6,871.06
5,951,739.080
670,570.603
6.40
12,159.98
91.81
79.35
9,044.95
8,968.04
1,479.84
6,900.00
5,951,744.216
670,599.436
13.09
12,190.16
90.89
76.65
9,044.23
8,967.32
1,486.11
6,929.51
5,951,751.129
670,628.800
9.45
12,223.18
89.97
72.68
9,043.99
8,967.08
1,494.84
6,961.35
5,951,760.549
670,660.437
12.34
12,253.01
89.32
69.60
9,044.17
8,967.26
1,504.48
6,989.57
5,951,770.802
670,688.443
10.55
12,282.17
88.65
66.64
9,044.69
8,967.78
1,515.34
7,016.62
5,951,782.251
670,715.250
10.41
12,310.80
88.40
63.80
9,045.42
8,968.51
1,527.34
7,042.60
5,951,794.807
670,740.964
9.95
12,340.52
89.35
61.73
9,046.01
8,969.10
1,540.94
7,069.02
5,951,808.975
670,787.079
7.66
12,372.39
90.18
58.41
9,046.14
8,969.23
1,556.83
7,096.64
5,951,825.469
670,794.340
10.74
12,404.37
89.20
54.76
9,046.31
8,969.40
1,574.44
7,123.33
5,951,843.652
670,820.637
11.82
12,430.65
90.16
52.64
9,046.45
8,969.54
1,590.00
7,144.50
5,951,659.665
670,641.470
8.89
12,460.46
89.14
51.40
9,046.63
8,969.72
1,608.34
7,168.00
5,951,878.514
670,664.560
5.43
12,490.52
90.43
45.22
9,046.74
8,969.83
1,628.33
7,190.44
5,951,898.979
670,886.554
21.00
12,520.89
91.63
42.22
9,046.20
6,969.29
1,650.27
7,211.42
5,951,921.371
670,907.054
10.64
12,550.88
91.90
38.97
9,045.27
8,968.36
1,873.03
7,230.92
5,951,944.547
670,926.056
10.87
12,580.60
90.12
35.60
9,044.75
8,967.84
1,696.63
7,248.96
5,951,968.539
670,943.576
12.23
V. Sec
(usft)
6,702.57
6,727.32
6,753.93
6,782.22
6,810.50
6,839.32
6,870.10
6,904.41
6,929.30
6,958.97
6,989.14
7,018.40
7,047.52
7,077.65
7,110.66
7,140.42
7,169.36
7,197.57
7,226.61
7,257.41
7,287.76
7,312.25
7,339.71
7,366.56
7,392.53
7,417.27
7,440.83
6282017 2: 17.30PM Page 11 COMPASS 5000.1 Build BID
,...
BP
Azl (uhnudi)
byFinal
Survey Report
BAKER
EAN
Northing
HUGHES
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well B-36
Project: Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING Q 76.91 usft (DOYON 16)
Site: PB B Pad
MD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Well: B-36
North Reference:
True
Wellbore: B -36A
Survey Calculation Method:
Minimum Curvature
Design: B -36A
Database:
EOM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azl (uhnudi)
TVD
TVOSS
NIS
EAN
Northing
Besting
DLeg
(usft)
PI
P)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100alft)
12,610.98
90.34
31.81
9,044.63
8,967.72
1,721.87
7,265.86
5,951,994.138
670,9%921
13.15
12,640.50
90.49
28.98
9,044.41
8,967.50
1,747.33
7,280.79
5,952,019.914
670,974.296
9.60
12,670.38
91.14
23.91
9,043.99
8,967.08
1,774.07
7,294.10
5,952,046.937
670,987.011
17.10
12,700.55
90.15
19.84
9,043.65
8,966.74
1,802.06
7,305.33
5,952,075.163
670,997.637
13.88
12,730.51
90.28
15.79
9,043.54
8,966.63
1,830.58
7,314.50
5,952,103.871
671,006.178
13.52
12,760.35
93.41
18.03
9,042.58
8,965.67
1,859.11
7,323.17
5,952,132.580
671,014.227
12.90
12,790.71
93.75
22.13
9,040.68
8,963.77
1,887.56
7,333.57
5,952,161.251
671,024.006
13.52
12,820.31
91.29
25.71
9,039.36
8,962.47
1,914.59
7,345.56
5,952,188.528
871,035.402
14.66
12,850.97
91.14
29.17
9,038.73
8,961.82
1,941.79
7,359.68
5,952,216.027
671,048.930
11.29
12,861.65
93.66
32.34
9,037.44
8,960.53
1,968.13
7,375.35
5,952,242.697
671,064.023
13.19
12,912.00
94.89
36.08
9,035.18
8,958.27
1,993.15
7,392.37
5,952,268.084
671,080.486
12.94
12,940.57
94.06
37.40
9,032.95
8,956.04
2,015.97
7,409.40
5,952,291.272
671,097.022
5.45
12,970.52
9175
39.25
9,031.43
8,954.52
2,039.44
7,427.95
5,952,315.131
671,115.053
9.88
13,000.82
90.21
43.39
9,030.91
8,954.00
2,062.18
7,447.95
5,952,338.306
671,134.550
14.58
13,030.25
89.69
47.84
9,030.94
8,954.03
2,082.76
7,468.98
5,952,359.338
671,155.123
15.22
13,061.08
87.60
49.54
9,031.67
8,954.76
2,103.11
7,492.12
5,952,380.179
671,177.822
8.74
13,090.80
89.08
51.74
9,032.53
8,955.62
2,121.95
7,515.09
5,952,399.512
671,200.373
8.92
13,120.75
90.74
55.24
9,032.58
8,955.67
2,139.76
7,539.16
5,952,417.845
671,224.046
12.93
13,150.91
93.81
57.92
9,031.38
8,954.47
2,156.36
7,564.31
5,952,434.983
671,248.825
13.51
13,180.14
98.13
60.66
9,028.34
6,951.43
2,171.20
7,589.29
5,952,450.366
671,273.479
17.47
13,210.83
102.02
62.11
9,022.97
8,946.06
2,185.67
7,615.81
5,952,465.408
671,299.675
13.50
13,240.52
104.84
64.19
9,016.08
8,939.17
2,198.72
7,641.57
5,952,479.008
671,325.143
11.69
13,271.06
109.97
67.64
9,006.94
8,930.03
2,210.61
7,668.16
5,952,491.481
671,351.462
19.96
13,300.39
112.03
70.99
8,996.43
8,919.52
2,220.29
7,693.77
5,952,501.710
671,376.852
12.77
13,335.72
111.51
76.48
8,983.32
8,906.41
2,229.47
7,725.25
5,952,511.574
671,408.125
14.50
13,365.24
108.80
79.50
8,973.14
8,896.23
2,235.23
7,752.35
5,952,517.921
671,435.093
13.28
13,390.64
108.54
83.77
8,965.01
8,888.10
2,238.73
7,776.15
5,952,521.936
671,458.810
15.96
V. Sec
(usft)
7,463.70
7,484.74
7,504.53
7,522.66
7,538.92
7,554.70
7,572.14
7,590.74
7,611.44
7,633.42
7,656.35
7,678.73
7,702.74
7,727.96
7,753.61
7,781.25
7,808.33
7,836.20
7,864.79
7,892.78
7,922.14
7,950.41
7,979.17
8,006.42
8,039.20
8,066.87
8,090.76
628/2017 2:17.30PM Page 12 COMPASS 50001 Build BID
6/282017 2:17:30PM Page 13 COMPASS 5000.1 Build 810
BP
I/.��
Zti��2 p
Final
Survey Report
BAKER
HUGHES
Company: North America
- ALASKA- BP
Local Co-ordinate Reference:
Well B-36
Project: Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING
@ 76.9lusft (DOYON 16)
Site: PB B Pad
MD Reference:
ORIG KELLY BUSHING
@ 76.91 usft (DOYON 16)
Well: B-36
North Reference:
True
Wellbore: B -36A
Survey Calculation Method:
Minimum Curvature
Design: B -36A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
T/DSS
WS
ENV
Northing
Easting
131-e9
V. Sec
(usft' (•)
(°)
(usft)
lush)
(usft)
lush)
(usft)
(usft)
(°/100usfy
(usft)
13,421.04
109.73
89.46
8,955.04
8,878.13
2,240.43
7,804.80
5,952,524.259
671,487.419
18.11
6,118.87
13,450.37
110.29
94.49
8,944.99
8,868.08
2,239.48
7,832.34
5,952,523.911
671,514.964
16.23
8,145.21
13,480.21
109.61
99.92
8,934.81
8,857.90
2,235.96
7,860.15
5,952,520.998
671,542.846
17.26
8,171.16
13,510.18
109.32
103.95
8,924.82
8,847.91
2,230.12
7,887.79
5,952,515.758
671,570.604
12.71
8,196.33
13,535.16
109.93
103.04
8,915.43
8,839.52
2,224.63
7,910.67
5,952,510.767
671,593.595
4.21
8,217.00
13,570.26
111.95
103.52
8,903.88
8,826.97
2,217.10
7,942.57
5,952,503.934
671,625.653
5.89
8,245.85
13,602.40
113.76
100.14
8,891.40
8,814.49
2,211.02
7,971.55
5,952,498.490
671,654.756
11.21
8,272.25
13,635.31
113.47
99.44
8,878.21
8,801.30
2,205.90
8,001.27
5,952,494.011
671,684.573
2.14
8,299.62
13,656.40
112.19
99.39
8,870.03
8,793.12
2,202.72
8,020.44
5,952,491.249
671,703.812
6.07
8,317.31
13,697.00
112.19
99.39
8,854.70
8,777.79
2,196.58
8,057.53
5,952,485.925
671,741.023
0.00
8,351.53
2 7/8"
13,702.00
112.19
99.39
8,852.81
8,775.90
2,195.83
8,062.10
5,952,485.269
671,745.606
0.00
8,355.74
Projection to TD
--
Casing Pointe
-
_
Measured
Vertical
Casing Hole
Depth
Depth
Diameter Diameter
(usft)
lush)
No"
(in) (in)
13,697.00
8,854.70
27/8"
2.875 4.250
11,550.00
8,931.52
4 1/2"
4.500 7.000
6/282017 2:17:30PM Page 13 COMPASS 5000.1 Build 810
1eN� by
BP
FORM
S` t
Final Survey Report
BMER
+W -S
+PJ -W
Company: Norm Amenca- ALASKA -BP
Local Co-ordinate Reference:
Well B-36
Project: Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING @ 76.9lusft (DOYON 16)
Site: PB B Pad
MD Reference:
ORIG KELLY BUSHING Q 76.91usft (DOYON 16)
Weil: B-36
North Reference:
True
Wellbore: B-36A
Survey Calculation Method:
Minimum Curvature
Design: B-36A
Database:
EDM RSK- Alaska PROD -ANCPt
Design Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+W -S
+PJ -W
(usft)
(usft)
(usft)
(usft)
Comment
11,524.60
8,924.76
1,125.30
6,457.47
TIP
11,547.00
8,930.75
1,143.08
6,469.71
KOP-TOWS
11,570.18
6,937.42
1,161.99
6,481.33
Interpolated Azimuth
11,600.30
8,948.25
1,186.67
6,494.74
Interpolated Azimuth
11,630.12
8,960.88
1,211.17
6,506.10
Interpolated Azimuth
13,702.00
8,852.81
2,195.83
8,062.10
Projection to TD
I Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes
82812017 2,17:30PM Page 14 COMPASS 5000.1 Build 81D
POST DRILLING
Ensdng(300usftlin)
$ $ g W m m W
aoW Oo� oO 0ww oOwi Owm ou.e�P aOu
OoJ _-_oO.
w
Q 0
0 O0._+.O J
0
oO ePO
oW
oN
eo'c 0o 00 00 NOee
0 oq
e wS
o
0 o e o
5954400 - B -3014-3D B qqOSp/d5�-qO$pBSPpB1 _•' _. 59541W
9000 'B-30/B-3DA 05/B-05DP
5951100{ .
B-28IB-28 5954100
59538 W{ o
58530
5953500! o B -36A ACTUAL &153s
5953200- n ,-�B=07/B-07
LR- R-0,113m1595320D
0�p0 / 'tea BOt
3 B-OB/B-08A
000
�j, �0S0 2000
0
9000 oh
B -27/B -27G
B -36/B -36A
PI.: P.dh..Rav
[yswi:fiAi
•`••o.•no uo un.n.ow.
nvmc�.e naaniu�
ao
o ,m
WelSleel PBBB-36
wen: 84
Wellbore: aaM
Design:"MIBaN9aMl
A yy�
i
x.rmmi
B'�p
P4ren1 WNb4n: Bab
Te an MD: 11521b9
CooinleR lwbiues: Xtl xs.TUMT
vu°rtl llNl XeAmxn gW°ELLr °ILMN3 na�W
4nbn ry51 x4nerce. 4u p n°x nPFl
�� .. O°�6Euv °uww0nsiwryovoxmlHUGHM
r..
BAKERObp
o
POST DRILLING
Ensdng(300usftlin)
$ $ g W m m W
aoW Oo� oO 0ww oOwi Owm ou.e�P aOu
OoJ _-_oO.
w
Q 0
0 O0._+.O J
0
oO ePO
oW
oN
eo'c 0o 00 00 NOee
0 oq
e wS
o
0 o e o
5954400 - B -3014-3D B qqOSp/d5�-qO$pBSPpB1 _•' _. 59541W
9000 'B-30/B-3DA 05/B-05DP
5951100{ .
B-28IB-28 5954100
59538 W{ o
58530
5953500! o B -36A ACTUAL &153s
5953200- n ,-�B=07/B-07
LR- R-0,113m1595320D
0�p0 / 'tea BOt
3 B-OB/B-08A
000
�j, �0S0 2000
0
9000 oh
B -27/B -27G
B -36/B -36A
00
o u
\ 5951100 OO
ao
o ,m
�
58/95001
o
voi
5949390 Y9/B-1690
Y00
oo oc
o
1B-21/8-21
-7000
B-19/6 19B
B-29B-23AB
0216-02A
600
8000
o
8-22/B-22
5848700!
- p
0
a
/B-29
8
5948400-
B_ /B-2
Q
8-29IB-29A
819
51pp� B I 2
DS/e-0
/B-
182 9/6.29APB1
B -22/8-22A - B{02/8.02
-
P
N N w w
O O O e
O
Q O
A O
P
O O
O
0
lPii o W J �
P W
o u m m Y J
O O O O . O O O O O
e Easting(300 usft/in)
J
N + o
O O O O
O O O
.—T—
J
o N
O
f�,IGCC 11 -DW; o
--
00
o u
\ 5951100 OO
North America - ALASKA - BP
Prudhoe Bay
PB B Pad
B-36
AOGCC Offset Well Report
28 June, 2017
rias
BAKER
°G OO 00O Report
HUGHES
aNd�
I
i�bp
ed
Filter type:
NO GLOBAL FILTER: Using user defined selection 6 filtering criteria
WARNING: There is hidden Light data in this project
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB B Pad
Site Error:
0oouSft
Reference Well:
8-36
Well Error:
0.00usft
Reference Wellbore
B -36A
Reference Design:
B -36A
BP
Anticollision Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
,efts
BAKER
HUGHES
Well B-36
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
B -36A
----�
Filter type:
NO GLOBAL FILTER: Using user defined selection 6 filtering criteria
WARNING: There is hidden Light data in this project
Interpolation Method:
MD Interval 25.00usft Ercor Madel:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center- center disbnce of 1,213.72usft Error Surface:
Elliptical Conic
Survey Program
Deb 6/28/2017 _
----�
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name Description
100.00
6,050.00 Survey #2 (B-36)
GYD-GC-MS Gymdata gyrocompassing m/s
6,107.49
11,524.601: MWD - Standard (B-36)
MWD MWD -Standard
11,547.00
13,656.40 BHI CTK MWD (B -36A)
MWD MWD -Standard
6/262017 2:3613PM
COMPASS 5000.1 Build 81D
2,.NS h BP //FA\
Z S by Anticollision Report BAKER
%f♦ •'� HUGHES
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well B-36
Project:
Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Reference Site:
PB B Pad
MD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Site Error:
000usft
North Reference:
True
Reference Well:
B-36
Survey Calculation Method:
Minimum Curvature
Well Error:
0.0ousft
Output errors are at
1.00 sigma
Reference Wellbore
B -36A
Database:
EDM RSK- Alaska PROD -ANCPt
Reference Design:
B -36A
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Whet Well - Wellbore - Design
(usft)
(usft)
(usft)
PB B Pad
B-01 - B-01 - 8-01
2,154.26
2,100.00
463.66
8-02 - B-02 - B-02
2,131.05
2,075.00
346.96
B-02 - B -02A - B -02A
2,145.98
2,100.00
347.23
B-03 - 8-03 - 8-03
2,128.68
2,075.00
236.58
B-03 - B-03PB1 - B-03PB1
2,128.88
2,075.00
236.58
B -03A - B -03A - B -03A
2,120.88
2,075.00
158.20
B -03A - B -03B - B -03B
2,120.88
2,075.00
158.20
8-04 - B-04 - B-04
2,105.60
2,050.00
132.62
B-04 - B -04A - B -04A
2,105.60
2,050.00
132.62
B-D4-B-04APB1-B-04APB1
2,105.60
2,050.00
132.62
B -05 -B -05-B-05
10,344.82
10,675.00
406.09
B -05 -B -05A -B -05A
9,934.19
10,250.00
304.06
B-05 - B -05B - B -05B
2,114.91
2,075.00
226.17
B-05 - B -05C - B -05C
2,114.91
2,075.00
226.17
B-05 - B -05D - B -05D
2,114.91
2,075.00
226.17
8-05-B-05DPB1-B-05DPB1
2,114.91
2,075.00
226.17
B-06 - 8-06 - B-06
2,123.11
2,075.00
39.59
8-07 - B-07 - 8-07
2,152.17
2,100.00
65.15
B-07 - B -07A - B -07A
2,156.02
2,125.00
65.18
B-08 - 8-08 - B-08
2,143.37
2,100.00
266.10
B-08 - B -08A - B -08A
2,140.65
2,100.00
266.04
8-18 - 8-18 - B-18
622.70
625.00
179.29
B-19 - B-19 - 8-19
479.27
475.00
76.35
B-19 - B -19A- 8-19A
479.27
475.00
76.35
8 -19 -B -19B -B -19B
493.83
500.00
76.59
B-1 9 - B-1 9B - Plan #16 B-1 9B
492.26
500.00
76.56
B-20 - 8-20 - B-20
71.92
75.00
35.05
B-20 - B -20A - B -20A
71.92
75.00
35.05
B-21 - B-21 - B-21
1,275.45
1,275.00
131.64
8 -22 -B -22-B-22
1,475.00
1,475.00
229.30
B-22 - B -22A - B -22A
1,482.30
1,475.00
229.51
B -23 -B -23-B-23
1,557.21
1,550.00
337.33
8 -23 -B -23A -B -23A
1,564.17
1,550.00
337.44
8 -24 -B -24-B-24
1,606.98
1,600.00
445.35
B-27 - B-27 - B-27
2,110.44
2,075.00
112.46
8 -27 -B -27A -B -27A
2,116.48
2,075.00
112.52
8 -27 -B -27B -B -27B
2,116.48
2,075.00
112.52
B-27 - B -27C - B -27C
11,597.18
12,375.00
125.78
B-27 - B-27CPB1 - B-27CPB1
2,116.48
2,075.00
112.52
8-27-B-27CP82-B-27CPB2
2,116.48
2,075.00
112.52
B-26 - 8-28 - 8-28
2,046.23
2,000.00
227.77
8-29 - B-29 - B-29
566.63
575.00
131.60
B-29 - B -29A- B -29A
566.63
575.00
131.60
B-29 - B-29APB7 - B-29APB7
566.63
575.00
131.60
B -30 -B -30-B-30
1,121.03
1,125.00
84.95
B-30 - B -30A - B -30A
1,121.03
1,125.00
84.95
B-33 - B-33. B-33
693.54
675.00
442.19
B-33 - B -33A - B -33A
691.01
675.00
442.15
B -36-B-36-13-36
11,850.90
11,850.00
86.90
PB DS 07
07 -09 -07 -09A -07-09A
13,695.62
11,125.00
618.62
6282017 2:36:13PM
COMPASS 5000.1 Build 81D
urea O WZelr 3.50:01 PM
North America - ALASKA - BP
Page 1 of 2
Cementing Report
Common Well Name: B-38 / 01
Project: Prudhoe Bey --- ---
- -- - -- --
---
— ---Event
no,:i Report date:6/30/2017____Ste:PBPad
Type: COM-ONSHORE(CON)
- -
TReport
Date/Time: 4/30/1996
StartDatiws/27/2017 End Date:
o.:Contractor:
NABORSALASKA DRILLING INC.
- _ ----
Rig Name/No.: CDR -2 Rig Release:
8HL-C: (1,056,885.00)
BPUOI: USAD0000626-
_ -- --"—' -
Active datum: KB @76.91usft (above Mean Sea Level)
— - — --
General Information
Job type: Primary
Cement job start date/time. 660/2017 10 42A
Job end date/time: 6130/2017 12:14PM
Cement Company: SCHLUMBERGER
Cementer: SETTLE
Cemented String: PRODUCTION LINER 1
String Size: 2.675 (in)
String Set TMD: 13,70200 lust) Hole Size: 4.250 (in)
Pipe Movement
Pipe Movement: NO MOVEMENT
Rotating Time (Start -End):
RPM.
Rotating Torque (initlavg/max): (ft-Ibf)
Reciprocating Time (Start -End).
Recip Drag Up/Down: - (kip)
SPM: Stroke Length:
Fluid Name: CEMENT
Fluids (i of 1)
Slurry Type: CEMENT
Purpose: PRIMARY
Class:
G -CLASS Description:
LEAD SLURRY Density: 15.30 (ppg)
Yield: 1.3100 (f-/sk)
Mix Water Ratio:
6.106 (gallsk94) Excess:
20.00(%) Mix Method: BATCH
Sacks Used: 136.70 (941b sacks)
Water Volume:
19.9 (boil Excess Slurry Volume:
5.3 (bbl) Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well:
Slurry Volume:
31.9 (bbl) Excess Measured From: EST. GAUGE HOLE
Mud Type:
Density:
9.78 (ppg) PV: 9.00 (cp)
YP: 28.000 (Ibf/100ft) Viscosity: 54.00 (s/qt)
Gels 10 Sec: 17.000 (Ibf/100111
Gels 10 Min:
21.000 (IM/100W)
Additives
Name
Type
Amount Units
Concentration Unit
0047
ANTIFOAM AGENT
D085
DISPERSANT
0.200
GAL/SX
0.167
FLUID LOSS
1.300
%BWOC
0600 G
GAS -BLOCK
0.100
%BWOC
D183
CEMENT
1.500
GAL/SX
D800
RETARDER AID
5.000
%BWOC
0.050
% IWOC
urea O WZelr 3.50:01 PM
Printed 8/2/2017 3:50:01 PM
North America - ALASKA - BP
Page 2ef9'
Cementing Report
Common Well Name: B-36 / 01
— __ _
Report no-.. 1 Report date'. 6/30/2017
Project: Prudhoe Bay
_.
_
—�
Site: PB B P d
-
Spud Date/Time: 4/30/1896
Event Type: COM -ONSHORE (CON)
_ _
Stolt Dete: 6/27/2017End Date
APE No.:
Contractor: NABORS ALASKA DRILLING INC.
Rig Name/No.: CDR -2 I Rig Release:
X3-018HL-C: (1,065.885.00)
BPUOI', USA100000626
Active datum: KB @76.911(above Mean Sea Level)
_ -
Stag"
Stage
Stage Type
Est. Top
Est. Bottom
Mud Circ.
Mud CirC.
Top Bottom
Plug
Pressure
Float
Pressure
Reurns
Circulate
Cmt Vol to
Total Annular
no.
(usfl)
(use)
Rate
Press.
Plug Plug
Bumped
Bumped
Held
Held
Prier
Surface
Mutl Lest Flow
(gpm)
(psi)
lnsl)
(min)
(hr)
(bbl)
(bhq Atter
1
PRIMARY CEMENT
10,898.00
13,702.00
y
y
Pumping Bohai
Fluid pumped
Volume
Avg.
Max Disp.
Slurry Top
Slurry Base
Start Mix Cmt
Start Slurry
Pumping end
Start Disp
Foam Gas Type
Gas Vol
BH circ,
Bin static
Pumped
Diep,
Rate
TMD
TMD
Pmp
date/time
job
Used
temp.
temp.
(bhQ
Rate
(bbVmin)
(usfl)
(usfl)
(scfj
bbl/min
Tests
Casing Test
Shoe Test
Liner Top Test
Test Pressure'. (psi)
FIT/LOT:
Wit)
Liner Overlap:
lush)
Time. (min)
Tool:
N
Positive Test:
(Ppg)
Positive Test Tool:
N
Cement Found between Shoe and Collar:
N
Open Hole Length: (usft)
Negative Test:
(Ppg)
Negative Test Tool:
N
Hours Before Start: (hr)
Time before test:
(hr)
Cmt Found on Tool.
N
Log/Survey Evaluation
Interpretation Summary
CBL Run: N
Cement Top:
(us")
Under Pressure: (psi)
How Determined:
Bond Quality:
TOC Sufficient:
N
GET Run: N
Job Rating:
Bond Quality:
If Unsuccessful, Detection Indicator:
Temp Survey: N
Remedial Cement Required:
N
Him Prior to Log: (hr)
How Determined:
Printed 8/2/2017 3:50:01 PM
21 7073
BA R 28413
Ta�U'&HESPRINT DISTRIBUTION LIST
GE Company Please sign and return one copy of this transmittal form to:
COMPANY BP Exploration Alaska Inc. BP Exploration (Alaska) Inc. DATA LOGGED
WELL NAME B -36A
RECEIVE `B nslonlBlvd. Data Center, LR2-1 M. K BENDEq
Anchorage, Alaska 99508
FIELD Prudhoe Bay Unit JUL 25 2017 toacknowledge recei tofthisdata.
COUNTY PRUDHOE BAYGCCLOG TYPE
BHI DISTRICT Alaska
GR - RES
LOG DATE June 27, 2017
AUTHORIZED BY Patrick Rider
EMAIL Patrick. Rider(a_bakerhughes.com TODAYS DATE July 21, 2017
Revision
STATUS Final Replacement: No Details:
Rev. Requested by:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. 90X)
PERSON ATTENTION
V
I BP North Slope.
EOA, PBOC, PR&20 (Office 109)
D&G WO Wells Admin Brenda Glassmaker & Peggy O'Neill
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConocoPhillips Alaska Inc.
Atm: Ricky Elgarico
ATO 3-344
700 G Street
Anchorage, AK 99510
3 Exxon Mobil, Alaska
Atm: Lynda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
FIELD 1
FINAL
CD/DVD
FINAL
PRELIM(las,
LOGS
dlis, PDF, META,
SURVEY
I
REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTSa
ur rKilm
# OF COPIES
# OF COPIES
I# OF COPIES
4 4 4 Z � lu
01 01 1 11 0
0 0 1 0 0
4 State of Alaska -AOGCC 0 1 1 7 0
Atm: Makans Bender
333 W. 7th Ave, Suite 100
.Anchorage, Alaska 99501
5 DNR- Division ofOil & Gas *** 0 0 1 1 0
Atm: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
*** Stamp "confidential" on all material deliver to DNR
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, IR24
900 E. Benson Blvd
Anchorage, Alaska 99508
Attn: Gerardo Cedillo
TOTALS FOR THIS PAGE: 0 2 4 4 0
by
RECEIVED
JUL 2 5 2017
A®GCC
North America - ALASKA - BP
Prudhoe Bay
PB B Pad
B-36
B -36A
500292266701
Design: B -36A
Final Survey Report
28 June, 2017
21 7073
rias
BAKER
HUGHES
284"15
b
Z p
Company:
NOMAmedca- ALASKA -BP
Project:
Prudhoe Bay
Site:
PB B Pad
Well:
B-36
Wellbore:
B -36A
Design:
B -36A
BP
I/.RE
Final Survey Report
BAKER
+N/ -S
HUGHES
Local Co-ordinate Reference:
Well B-36
TVD Reference:
ORIG KELLY BUSHING @ 76.9lusft (DOYON 16)
MD Reference:
ORIG KELLY BUSHING @ 76.9lusft (DOYON 16)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Project Prudhoe Bay, GPB, PRUDHOE BAY
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point
Map Zone: NAD27'OGP-Usa AK/ Alaska zone 4[26734`1586, Using geodetic scale factor
site PB B Pad, TR -11-14
ACTUAL
Tie On Depth:
Depth From (TVD)
+N/ -S
Site Position:
Northing:
5,946,440.220 Usti
Latitude:
70° 15' 36.475 N
From: Map
Easting:
662,094.050 usft
Longitude:
148' 41'22.1143 W
Position Uncertainty: 0.00 usft
Slot Radius:
0.000 in
Grid Convergence:
1.23 '
g B-36, B-36
ACTUAL
Tie On Depth:
Depth From (TVD)
+N/ -S
II Position +N/.S 0.00 usti
Northing:
5,950,114.740 usft
Latitude:
70° 16'12.259 N
.E/ -W 0.00 usti
Easting:
663,733.740 usft
Longitude:
148° 40'32+816 W
rition Uncertainty 0.00 usft
Wellhead Elevation:
43.23 usft
Ground Level:
41.33 usft
Wellbors,
Magnetics
Design
Audit Notes:
Version:
Vertical Section:
B -36A
Model Name Sample Date Declination
1°I
BGGM2016 7/1/2017 17.81
B -36A
Dip Angle
1°)
80.99
Phase:
ACTUAL
Tie On Depth:
Depth From (TVD)
+N/ -S
+EAW
(usft)
(uslt)
(usft)
33.68
0.00
0.00
Field Strength
(nT)
57,547
11,524.60
Direction
(°)
74.94
6/282017 2: 17.30PM Page 2 COMPASS 5000.1 Build 81D
Survey Program
Date 6/28/2017
BP
rER
b pFinal
To
Survey Report
BAKER
(usft)
(usft) Survey (Wellbom)
Tool Name
HUGHES
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well B-36
Project:
Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Site:
PB B Pad
MD Reference:
ORIG KELLY BUSHING @ 76.9lusft (DOYON 16)
Well:
B-36
North Reference:
True
Wellbore:
B -36A
Survey Calculation Method:
Minimum Curvature
Design:
B -36A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey Program
Date 6/28/2017
From
To
(usft)
(usft) Survey (Wellbom)
Tool Name
Description
100.00
6,050.00 Survey #2 (8-36)
GYD-GC-MS
Gyrodata gyrocompassing m/s
6,107.49
11,524.60 1 : MWD -Standard (B-36)
MWD
MWD - Standard
11,547.00
13,656.40 BHI CTK MWD (B -36A)
MWD
MWD -Standard
Survey
MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easing DLeg V. Sec
(usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft)
33.68 0.00 0.00 33.68 43.23 0.00 0.00 5,950,114.740 663,733.740 0.00 0.00
100.00 0.12 158.07 100.00 23.09 -0.06 0.03 5,950,114.676 663,733.767 0.18 0.01
110.00 0.11 158.30 110.00 33.09 -0.08 0.03 5,950,114.657 663,733.775 0.06 0.01
20"
200.00
0.06
162.42
200.00
123.09
-0.21
0.08
5,950,114.530
663,733.825
0.06
0.02
300.00
0.08
101.96
300.00
223.09
-0.28
0.16
5,950,114.468
663,733.911
0.07
0.09
400.00
0.37
86.91
400.00
32309
-0.27
0.56
5950,114.479
663,734.301
0.29
0.47
500.00
1.88
119.32
499.98
423.07
-106
2.31
5,950,113.732
663,736.071
1.58
1.95
600.00
3.47
118.84
599.87
522.96
-3.32
6.39
5,950,111.558
663,740.200
1.59
5.31
700.00
4.15
116.59
699.64
622.73
-6.40
12.28
5,950,108.608
663,746.152
0.70
10.1:
750.00
4.52
111.92
749.50
672.59
-7.95
15.72
5,950,107.138
663,749.630
1.02
13.12
800.00
4.99
108.54
799.33
722.42
-9.37
19.61
5,950,105.796
663,753.549
1.09
16.50
850.00
5.10
109.78
849.13
772.22
-10.82
23.76
5,950,104.443
663,757.733
0.31
20.14
900.00
5.42
106.98
898.92
822.01
-12.26
28.11
5,950,103.096
663,762.112
0.82
23.96
950.00
5.59
110.10
948.69
871.78
-13.79
32.66
5,950,101.669
663,766.689
0.69
27.96
1,000.00
5.98
114.56
998.44
921.53
-15.70
37.32
5,950,099.852
663,771.386
1.19
31.95
1,050.00
6.21
113.34
1,048.16
971.25
-17.86
42.17
5,950,097.804
663,776.283
0.53
36.08
1,100.00
6.77
121.35
1,097.84
1,020.93
-20.46
47.17
5,950,095.309
663,781.338
2.13
40.23
1,150.00
7.52
117.41
1,147.45
1,070.54
-23.50
52.59
5,950,092.388
663,786.824
1.79
44.68
1,200.00
8.19
122.90
1,196.98
1,120.07
-26.94
58.48
5,950,089.077
663,792.792
2.01
49.47
1,250.00
9.91
119.36
1,246.36
1,169.45
-30.99
65.22
5,950,085.180
663,799.618
3.61
54.93
6/28/2017 2:17:30PM
Page 3
COMPASS 5000.1 Build BI D
Survey
BP
EARN
= p
Final Survey Report
BAKER
�lEs1E5
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well B-36
Project: Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
Site: PB B Pad
MD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Well: B-36
North Reference:
True
Wellborn B -36A
Survey Calculation Method:
Minimum Curvature
Design: B -36A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (admuft)
TVD
TVDSS
NIS
ElW
Northing
Easting
DLeg
V. Sac
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
1,300.00
11.08
119.06
1,295.52
1,218.61
-35.43
73.17
5,950,080.911
663,807.663
2.34
61.45
1,350.00
12.15
119.03
1,344.49
1,267.58
40.32
81.97
5,950,076.217
663,816.567
2.14
68.61'
1,400.00
13.34
115.85
1,393.26
1,316.35
45.39
91.77
5,950,071.363
663,826.466
2.76
76.82
1,450.00
14.06
114.02
1,441.84
1,364.93
-50.37
102.51
5,950,066.611
663,837.310
1.68
85.90
1,500.00
14.74
112.20
1,490.27
1,413.36
-55.25
113.94
5,950,061.985
663,848.850
1.63
95.67
1,550.00
14.75
109.00
1,538.62
1,461.71
-59.73
125.85
5,950,057.770
663,860.851
1.63
106.01
1,600.00
15.60
107.18
1,586.88
1,509.97
-63.78
138.29
5,950,053.984
663,873.377
1.95
116.97
1,650.00
15.94
106.46
1,635.00
1,558.09
-67.72
151.30
5,950,050.336
663,886.466
0.78
128.51
1,700.00
16.41
107.13
1,683.02
1,606.11
-71.74
164.63
5,950,046.602
663,899.884
1.01
140.34
1,750.00
16.87
100.46
1,730.93
1,654.02
-75.14
178.52
5,950,043.507
663,913.839
3.93
152.86
1,800.00
16.98
100.58
1,778.76
1,701.85
-77.80
192.83
5,950,041.162
663,928.203
0.23
165.99
1,850.00
17.77
101.50
1,826.48
1,749.57
-80.66
207.48
5,950,038.620
663,942.915
1.67
179.40
1,900.00
19.47
96.97
1,873.86
1,796.95
-83.19
223.23
5,950;036:431
663,958.715
4.46
193.95
1,950.00
22.23
91.39
1,920.59
1,843.68
-84.43
240.97
5950,035.576
663,976.469
6.79
210.75
2,000.00
23.08
91.21
1,966.73
1,889.82
-84.87
260.22
5,950,035.558
663,995.726
1.71
229.23
2,050.00
22.08
90.56
2,012.90
1,935.99
-85.17
279.42
5,950,035.677
664,014.923
2.06
247.69
2,100.00
21.64
90.25
2,059.30
1,982.39
-85.30
298.03
5,950,035.950
664,033.536
0.91
265,6?
2,150.00
22.79
90.29
2,105.59
2,028.68
-85.39
316.94
5,950,036.272
664,052.436
2.30
283.86
2,200.00
25.05
90.45
2,151.29
2,074.38
-85.52
337.21
5,950,036.581
664,072.704
4.52
303.40
2,250.00
25.90
90.31
2,196.43
2,119.52
-85.66
358.71
5,950,036.906
664,094.206
1.70
324.13
2,300.00
26.05
90.84
2,241.38
2,164.47
-85.88
380.61
5,950,037.163
664,116.101
0.55
345.22
2,350.00
25.47
91.45
2,286.41
2,209.50
-86.32
402.34
5,950,037.203
664,137.829
1.28
366.09
2,400.00
25.58
92.04
2,331.53
2,254.62
-86.97
423.87
5,950,037.016
664,159.372
0.55
386.71
2,450.00
25.06
92.48
2,376.73
2,299.82
-87.81
445.24
5,950,036.639
664,180.751
1.11
407.13
2,500.00
25.53
93.83
2,421.94
2,345.03
-88.99
466.57
5,950,035.925
664,202.100
1.49
427.42
2,550.00
26.33
95.80
2,466.90
2,389.99
-90.83
488.35
5,950,034.559
664,223.916
2.35
447.98
2,600.00
27.02
96.04
2,511.58
2,434.67
-93.15
510.68
5,950,032.730
664,246.286
1.40
468.93
6/28/2017 2:17.30PM Page 4 COMPASS 5000.1 Build 81D
,Pit" BP EARN
S_ % by Final Survey Report BAKER
kI'HUGHES
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB B Pad
Well:
B-36
Wellbore:
B -36A
Design:
B -36A
Survey
MD
(usft)
2,650.00
2,700.00
2,750.00
2,800.00
2,850.00
2,900.00
2,950.00
3,000.00
3,050.00
3,100.00
3,150.00
3,200.00
3,250.00
3,300.00
3,350.00
3,400.00
3,450.00
3,500.00
3,550.00
3,600.00
3,649.00
9513.1
3,650.00
3,700.00
3,750.00
3,800.00
3,850.00
Inc
(1)
29.28
30.53
31.49
31.59
31.78
32.98
34.60
36.13
36.73
37.91
39.04
40.56
41.40
41.50
41.82
41.38
42.27
43.46
43.51
46.38
43.33
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well B-36
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
True
Minimum Curvature
EDM R5K- Alaska PROD - ANCP1
Azi (azimuth)
TVD
TVDSS
NIS
EM/
Northing
5,950,081.842
Eas0ng
6.22
DLeg
V. Sec
V)
(usft)
(usft)
(usft)
(usft)
(usft)
5,950,087.210
(usft)
1.57
(°1100usft)
(usft)
95.38
2,555.66
2,478.75
-95.49
534.15
5,950,030.900
5,950,092.484
664,269.801
1.16
4.56
490.9E
94.25
2,599.01
2,522.10
-97.58
558.99
5,950,029.353
5,950,097.672
664,294.678
0.14
2.74
514.43
93.23
2,641.86
2,564.95
-99.25
584.69
5,950,028.236
5,950,103.625
664,320.410
3.66
2.19
538.82
91.58
2,684.47
2,607.56
-100.35
610.82
5,950,027.707
664,346.555
1.74
563.77
91.15
2,727.02
2,650.11
-100.98
637.07
5,950,027.653
664,372.816
0.59
588.96
91.14
2,769.25
2,692.34
-101.51
663.84
5,950,027.701
664,399.590
2.40
614.67
90.70
2,810.80
2,733.89
-101.95
691.65
5,950,027.862
664,427.394
3.28
641.40
90.39
2,851.57
2,774.66
-102.23
720.58
5,950,028.217
664,456.328
3.08
669.27
89.01
2,891.80
2,814.89
-102.07
750.27
5,950,029.021
664,486.005
2.03
697.98
87.53
2,931.56
2,854.65
-101.15
780.57
5,950,030.600
664,516.273
2.96
727.48
86.48
2,970.71
2,893.80
-99.52
811.64
5,950,032.904
664,547.292
2.61
757.90
85.39
3,009.12
2,932.21
-97.25
643.56
5,950,035.872
664,579.156
3.34
789.32
84.06
3,046.87
2,969.96
-94.23
876.21
5,950,039.598
664,611.729
2.42
821.63
82.80
3,084.35
3,007.44
-90.44
909.09
5,950,044.100
664,644.516
1.68
854.36
82.34
3,121.70
3,044.79
-86.14
942.04
5.950.049.113
664,677.368
0.89
887.30
82.05
3,159.09
3,082.18
-81.64
974.93
5,950,054.335
664,710.149
0.96
920.25
81.90
3,196.35
3,119.44
-76.98
1,007.95
5,950,059.707
664,743.054
1.79
953.33
81.85
3,233.00
3,156.09
-72.17
1,041.62
5,950,065.245
664,776.610
2.38
987.09
82.03
3,269.28
3,192.37
-67.35
1,075.69
5,950,070.809
664,810.563
0.27
1,021.24
82.36
3,304.66
3,227.75
-62.56
1,110.68
5,950,076.363
664,845.439
5.76
1,056.28
82.24
3,339.39
3,262.48
-57.93
1,144.92
5,950,081.735
664,879.574
6.22
1,090.55
43.27
82.24
3,340.12
3,263.21
-57.84
1,145.60
5,950,081.842
664,880.251
6.22
1,091.23
44.05
82.36
3,376.29
3,299.38
-53.21
1,179.81
5,950,087.210
664,914.347
1.57
1,125.46
43.49
82.59
3,412.40
3,335.49
-48.68
1,214.10
5,950,092.484
664,948.528
1.16
1,159.75
43.56
82.57
3,448.65
3,371.74
-44.23
1,248.25
5,950,097.672
664,982.566
0.14
1,193.88
43.23
79.95
3,484.99
3,408.08
-39.02
1,282.19
5,950,103.625
665,016.389
3.66
1,228.02
628/2017 2: 1790PM Page 5 COMPASS 5000.1 Build 81D
b BP /d Fla
pFinal Survey Report BAKERER
HUGHES
Company:
Project:
Site:
Well;
Wellbore:
Design:
North America - ALASKA - BP
Prudhoe Bay
PB B Pad
8-36
B -36A
B -36A
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well B-36
ORIG KELLY BUSHING @ 76.91usf1 (DOYON 16)
ORIG KELLY BUSHING @ 76.9lusf1 (DOYON 16)
True
Minimum Curvature
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(ucft)
(usft)
(usft)
Will)
(usft)
(usft)
(°NOOusft)
(waft)
3,900.00
43.20
79.20
3,521.43
3,444.52
-32.82
1,315.86
5,950,110.551
665,049.915
1.03
1,262.14
3,950.00
42.75
77.41
3,558.01
3,481.10
-25.92
1,349.24
5,950,118.181
665,083.129
2.60
1,296.1f
4,000.00
42.21
77.20
3,594.89
3,517.98
-18.50
1,382.18
5,950,126.315
665,115.898
1.12
1,329.90
4,050.00
42.72
77.29
3,631.77
3,554.86
-11.04
1,415.10
5,950,134.482
665,148.650
1.03
1,363.63
4,100.00
42.44
77.55
3,668.59
3,591.68
-3.67
1,448.12
5,950,142.567
665,181.498
0.66
1,397.43
4,150.00
43.78
78.00
3,705.09
3,628.18
3.56
1,481.52
5,950,150.525
665,214.725
2.75
1,431.56
4,200.00
43.12
78.19
3,741.39
3,664.48
10.65
1,515.16
5,950,158.348
665,248.207
1.35
1,465.89
4,250.00
43.11
78.35
3,777.89
3,700.98
17.60
1,548.62
5,950,166.021
665,281.505
0.22
1,500.01
4,300.00
43.06
78.80
3,814.40
3,737.49
24.37
1,582.10
5,950,173.513
665,314.825
0.62
1,534.09
4,350.00
43.28
79.04
3,850.87
3,773.96
30.94
1,615.67
5,950,180.815
665,348.242
0.55
1,568.22
4,400.00
42.91
78.80
3,887.38
3,810.47
37.50
1,649.19
5,950,188.107
665,381.613
0.81
1,602.30
4,450.00
43.16
78.70
3,923.93
3,847.02
44.16
1,682.66
5,950,195.490
665,414.924
0.52
1,636.34
4,500.00
43.03
78.78
3,960.44
3,883.53
50.83
1,716.16
5,950,202.887
665,448.272
0.28
1,670.43
4,550.00
42.95
78.97
3,997.01
3,920.10
57.41
1,749.62
5,950,210.191
665,481.571
0.30
1,704.44
4,600.00
42.76
79.18
4,033.66
3,956.75
63.86
1783.01
5,950,217.362
665,514.818
0.44
1,738.37
4,650.00
42.34
79.18
4,070.49
3,993.58
70.20
1,816.23
5,950,224.431
665,547.886
0.88
1,772.09
4,700.00
42.36
79.20
4,107.44
4,030.53
76.52
1,849.31
5,950,231.466
665,580.824
0.05
1,805.6A
4,750.00
41.75
79.30
4,144.57
4,067.66
82.77
1,882.22
5,950,238.427
665,613.582
1.23
1,839.08
4,800.00
42.07
79.52
4,181.77
4,104.86
88.91
1,915.05
5,950,245.277
665,646.268
0.70
1,872.38
4,650.00
41.49
79.76
4,219.06
4,142.15
94.90
1,947.82
5,950,251.979
665,676.898
1.20
1,905.58
4,900.00
42.38
80.18
4,256.26
4,179.35
100.72
1,980.72
5,950,258.512
665,711.665
1.87
1,938.86
4,950.00
42.58
80.45
4,293.13
4,216.22
106.40
2,014.01
5,950,264.915
665,744.816
0.54
1,972.48
5,000.00
42.39
80.49
4,330.00
4,253.09
111.99
2,047.31
5,950,271.228
665,777.988
0.38
2,006.09
5,050.00
42.14
80.72
4,367.01
4,290.10
117.48
2,080.49
5,950,277.438
665,811.035
0.59
2,039.56
5,100.00
41.56
81.18
4,404.25
4,327.34
122.73
2,113.43
5,950,283.401
665,843.854
1.31
2,072.73
5,150.00
41.91
81.03
4,441.56
4,364.65
127.87
2,146.32
5,950,289.261
665,876.616
0.73
2,105.82
5,200.00
42.87
80.79
4,478.49
4,401.58
133.20
2,179.60
5,950,295.310
665,909.775
1.95
2,139.35
6282017 2: IT.30PM
Page 6
COMPASS
5000.1 Build BID
Survey
Z by
Final Survey Report
BAKER
,2
s►N
HUGHES
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well B-36
Project:
Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Site:
PB B Pad
MD Reference:
ORIG KELLY BUSHING (off 76.9lusft (DOYON 16)
Well:
B-36
North Reference:
True
Wellbore:
B -36A
Survey Calculation Method:
Minimum Curvature
Design:
B -36A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azt(azimuth)
TVD
T/DSS
NIS
PJW
Northing
Beating
DLeg
V. Seo
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°AOOusft)
(usft)
5,250.00
43.55
80.62
4,514.93
4,438.02
138.73
2,213.38
5,950,301.573
665,943.428
1.38
2,173.41
5,300.00
43.07
80.67
4,551.31
4,474.40
144.30
2,247.22
5,950,307.882
665,977.138
0.96
2,207.54
5,350.00
43.23
80.80
4,587.79
4,510.88
149.81
2,280.97
5,950,314.120
666,010.757
0.37
2,241.56
5,400.00
43.23
81.16
4,624.22
4,547.31
155.18
2,314.80
5,950,320.223
666,044.453
0.49
2,275.61
5,450.00
42.89
81.63
4,660.76
4,583.85
160.29
2,348.55
5,950,326.064
666,078.085
0.94
2,309.54
5,500.00
42.49
82.46
4,697.51
4,620.60
164.98
2,382.13
5,950,331.486
666,111.547
1.38
2,343.18
5,550.00
42.33
82.71
4,734.42
4,657.51
169.33
2,415.56
5,950,336.564
666,144.882
0.46
2,376.60
5,600.00
42.56
82.40
4,771.32
4,694.41
173.70
2,449.02
5,950,341.663
666,178.236
0.62
2,410.04
5,650.00
43.53
81.47
4,807.86
4,730.95
178.49
2,482.81
5,950,347.187
666,211.911
2.32
2,443.92
5,700.00
43.58
81.69
4,844.10
4,767.19
183.54
2,516.89
5,950,352.972
666,245.872
0.32
2,478.14
5,750.00
43.36
82.06
4,880.38
4,803.47
188.40
2,550.95
5,950,358.573
666,279.809
0.67
2,512.29
5,800.00
43.82
81.49
4,916.60
4,839.69
193.33
2,585.07
5,950,364.246
666,313.611
1.21
2,546.52
5,850.00
43.59
79.69
4,952,75
4,875.84
198.98
2,619.15
5,950,370.632
666,347.757
2.53
2,580.89
5,900.00
43.68
80.11
4,988.93
-4,912.02
205.03
2,653.12
5,950,377.420
666,381.583
0.61
2,615.27
5,950.00
44.65
81.12
5,024.80 -
4,947.89
- 210.71
2,687.48 -
5,950,383.844
666,415.819
2.40
2,649.93
6,000.00
45.14
82.49
5,060.22
4,983.31
215.74
2,722.41
5,950,389.630
666,450.627
2.17
2,684.97
6,050.00
45.18
82.90
5,095.48
5,018.57
220.24
2,757.58
5,950,394.902
666,465.684
0.59
2,720.09
6,107.49
46.60
81.80
5,135.49
5,058.58
225.74
2,798.49
5,950,401.289
666,526.460
2.83
2,761.03
6,202.96
46.10
81.70
5,201.39
5,124.48
235.66
2,866.85
5,950,412.686
666,594.588
0.53
2,829.62
6,298.62
45.40
78.50
5,268.15
5,191.24
247.42
2,934.34
5,950,425.917
666,661.796
2.51
2,897.84
6,393.20
46.00
79.20
5,334.21
5,257.30
260.51
3,000.75
5,950,440.445
666,727.903
0.83
2,965.37
6,489.02
46.20
78.20
5,400.65
5,323.74
274.04
3,068.45
5,950,455.443
666,795.291
0.78
3,034.27
6,584.86
45.40
75.60
5,467.47
5,390.56
289.60
3,135.36
5,950,472.453
666,861.843
2.12
3,102.92
6,680.64
44.40
74.50
5,535.31
5,458.40
307.03
3,200.68
5,950,491.304
666,926.762
1.32
3,170.53
6,776.28
42.70
74.00
5,604.63
5,527.72
324.92
3,264.10
5,950,510.559
666,989.773
1.81
3,236.42
6,871.83
42.40
74.50
5,675.02
5,598.11
342.46
3,326.29
5,950,529.446
667,051.560
0.47
3,301.02
6,967.59
42.30
74.00
5,745.79
5,668.88
359.97
3,388.37
5,950,548.302
667,113.247
0.37
3,365.53
612812017 2: 17.30PM Page 7 COMPASS 5000.1 Build 81D
ice?
BP
Final Survey Report
FORM
HUGHES
HUGHES
Company: North America - ALASKA- BP
Project: Prudhoe Bay
Site: PB B Pad
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
Well B-36
ORIG KELLY BUSHING @ 76.9lusft (DOYON 16)
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
Well: 8-36
North Reference:
True
Wellbore: B -36A
Survey Calculation Method:
Minimum Curvature
Design: B -36A
Database:
EDM RSK- Alaska PROD -ANCP7
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
E1W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
('HOOusft)
(usft)
7,063.40
42.30
73.60
5,816.66
5,739.75
377.95
3,450.30
5,950,567.633
667,174.758
0.28
3,430.00
7,137.88
42.40
74.30
5,871.70
5,794.79
391.83
3,498.51
5,950,582.549
667,222.659
0.65
3,480.1f
7,230.84
42.40
75.70
5,940.35
5,863.44
408.05
3,559.06
5,950,600.083
667,262.832
1.02
3,542.84
7,326.46
42.40
77.00
6,010.96
5,934.05
423.26
3,621.71
5,950,616.657
667,345.134
0.92
3,607.30
7,422.05
42.50
79.10
6,081.50
6,004.59
436.62
3,684.82
5,950,631.382
667,407.937
1.49
3,671.71
7,517.87
42.10
79.60
6,152.37
6.075.46
448.54
3,748.20
5,950,644.676
667,471.035
0.55
3,736.01
7,614.01
41.80
79.80
6,223.87
6.146.96
460.03
3,811.43
5,950,657.539
667,533.998
0.34
3,800.06
7,708.33
42.90
80.10
6,293.58
6,216.67
471.12
3,874.00
5,950,669.983
667,596.301
1.19
3,863.35
7,804.11
43.00
79.60
6,363.68
6,286.77
482.62
3,938.23
5,950,682.878
667,660.270
0.37
3,928.37
7,898.85
42.90
79.60
6,433.03
6,356.12
494.27
4,001.73
5,950,695.908
667,723.489
0.11
3,992.71
7,995.28
42.60
80.10
6,503.84
6,426.93
505.81
4,066.16
5,950,708.842
667,787.650
0.47
4,057.93
8,089.95
42.10
79.40
6,573.80
6,496.89
517.15
4,128.91
5,950,721.550
667,850.140
0.73
021.48
8,183.96
41.10
78.90
6,644.10
6,567.19
528.90
4190.21
5,950,734.626
667,911.165
1.12
4,183.72
8,280.93
40.80
78.70
6,717.34
6,640.43
541.24
4,252.56
5,950,748.323
667,973.221
0.34
4,247.13
8,376.10
41.30
78.90
6,789.11
6,712.20
553.38
4,313.87
5,950,761.791
668,034.248
0.54
4,309.49
8,471.71
41.60
79.60
6,860.78
6,783.87
565.19
4,376.05
5,950,774.944
668,096.151
0.58
4,372.60
8,567.02
42.60
80.10
6,931.49
6,854.58
576.44
4,438.94
5,950,787.567
668,158.785
1.11
4,436.2f
8,662.66
43.50
81.20
7,001.38
6,924.47
587.05
4,503.36
5,950,799.566
668,222.953
1.23
4,501.22
8,758.51
43.10
81.00
7,071.14
6,994.23
597.21
4,568.31
5,950,811.145
668,287.656
0.44
4,566.58
8,854.50
42.70
81.40
7,141.46
7,064.55
607.21
4,632.88
5,950,822.544
668,351.991
0.50
4,631.53
8,949.28
42.30
81.90
7,211.34
7,134.43
616.51
4,696.23
5,950,833.219
668,415.122
0.55
4,695.12
9,045.13
41.60
80.10
7,282.63
7,205.72
626.53
4,759.51
5,950,844.608
668,478.165
1.45
4,758.83
9,140.85
41.30
81.00
7,354.37
7,277.46
636.93
4,822.01
5,950,856.369
668,540.422
0.70
4,621.89
9,235.03
40.80
79.10
7,425.40
7,348.49
647.61
4,882.93
5,950,868.372
668,601.085
1.43
4,883.49
9,331.31
41.70
78.70
7,497.78
7,420.87
659.84
4,945.22
5,950,881.946
668,663.093
0.97
4,946.82
9,421.19
41.20
78.40
7,565.15
7,488.24
671.65
5,003.53
5,950,895.022
668,721.131
0.60
5,006.20
9,522.31
41.20
78.00
7,641.24
7,564.33
685.27
5,068.73
5,950,910.056
668,786.014
0.26
5,072.70
6/28/2017 2: 17'30PM Page 8 COMPASS 5000.1 Build 81D
bp
BP
//.R\
Z. S
Final
Survey Report
BAKER
HUGHES
Company: North America-
ALASKA
- BP
Local Co-ordinate
Reference:
Well B-36
Project: Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING
@ 76.9lusft (DOYON 16)
Site: PB B Pad
MD Reference:
ORIG KELLY
BUSHING
@ 76.91usft (DOYON 16)
Well: B-36
North Reference:
True
Wellbore: B -36A
Survey Calculation
Method:
Minimum Curvature
Design: B -36A
Database:
EDM RSK-
Alaska PROD -ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
N/S
ENV
Northing
Easting
Dl -eq
V. Sec
(usft) (1)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
9,617.08
42.20
78.70
7,712.00
7,635.09
697.99
5,130.48
5,950,924.122
668,847.462
1.16
5,135.65
9,712.26
42.80
78.20
7,782.17
7,705.26
710.87
5,193.48
5,950,938.365
668,910.163
0.72
5,199.81
9,807.98
41.90
78.20
7,852.91
7,776.00
724.06
5,256.60
5,950,952.92D
668,972.976
0.94
5,264.19
9,903.58
41.20
79.10
7,924.46
7,847.55
736.54
5,318.76
5,950,966.751
669,034.851
0.96
5,327.46
9,998.99
41.80
80.30
7,995.91
7,919.00
747.84
5,380.96
5,950,979.400
669,096.786
1.04
5,390.46
10,094.94
_ 42.80
80.80
8,066.88
7,989.97
758.44
5,444.66
5,950,991.382
669,160.235
1.10
5,454.72
10,190.36
42.30
81.00
8,137.18
8,060.27
768.64
5,508.37
5,951,002.970
669,223.707
0.54
5,518.90
10,285.97
41.10
81.20
8,208.56
6,131.65
778.48
5,571.21
5,951,014.175
669,286.309
1.26
5,582.14
10,381.59
41.40
81.20
8,280.45
8,203.54
788.13
5,633.51
5,951,025.173
669,348.385
0.31
5,644.81
10,477.61
43.20
80.00
8,351.47
8,274.56
798.70
5,697.26
5,951,037.122
669,411.883
2.05
5,709.11
10,572.69
42.50
80.30
8,421.32
8,344.41
809.78
5,761.10
5,951,049.593
669,475.465
0.77
5,773.64
10,669.76
42.50
80.80
8,492.74
8,415.83
820.53
5,825.66
5,951,061739
669,539.767
0.35
5,838.77
10,748.92
42.80
81.00
8,550.96
8,474.05
829.01
5,878.62
;5,951,071.371
669,592.524
0.42
5,892.11
10,798.90
41.90
80.50
8,587.90
8,510.99
834.42
5,911.85
5,951,077.503
669,625.627
1.92
5,925.61
10,823.00
42.34
80.28
8,605.78
8,528.87
837.12
5,927.78
5,951,080.547
669,641.500
1.93
5,941.70
7..
10,831.74
42.50
80.20
8,612.23
8,535.32
838.12
5,933.59
5,951,081.673
669,647.287
1.93
5,947.57
10,862.59
45.30
80.00
8,634.46
8,557.55
841.80
5,954.67
5,951,085.808
669,668.271
9.09
5,968.87
10,892.61
49.30
79.20
8,654.81
8,577.90
845.78
5,976.36
5,951,090.265
669,689.872
13.47
5,990.86
10,922.15
52.40
80.00
8,673.46
8,596.55
849.91
5,998.89
5,951,094.886
669,712.304
10.70
6,013.69
10,954.09
56.40
80.00
8,692.05
8,615.14
854.42
6,024.46
5,951,099.949
669,737.769
12.52
6,039.55
10,985.89
59.10
78.60
8,709.02
8,632.11
859.42
6,050.88
5,951,105.520
669,764.074
9.27
6,066.36
11,017.23
62.80
75.80
8,724.23
8,647.32
865.50
6,077.59
5,951,112.179
669,790.639
14.15
6,093.73
11,048.41
65.60
73.20
8,737.80
8,660.89
873.01
6,104.63
5,951,120.272
669,817.511
11.70
6,121.80
11,081.28
67.50
69.30
8,750.89
8,673.98
882.70
6,133.17
5,951,13D.587
669,645.835
12.32
6,151.88
11,110.52
67.90
64.80
8,761.99
8,685.08
893.25
6,158.08
5,951,141.672
669,870.501
14.30
6,178.67
11,145.04
67.20
60.30
8,775.18
8,698.27
907.95
6,186.38
5,951,156.983
669,898.476
12.22
6,209.62
6/282017 2.17.30PM
Page 9
COMPASS 5000.1 Build 81D
'sem` p
BP
Final Survey Report
WE Fag
BAKER
HUGHES
Company: North America - ALASKA - BP
Project: Prudhoe Bay
Site: PS B Pad
Well: B-36
Wellbore: B -36A
Design: B -36A
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well B-36
ORIG KELLY BUSHING @ 76.9lusft (DOYON 16)
ORIG KELLY BUSHING @ 76.9lusft (DOYON 16)
True
Minimum Curvature
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
PJW
Northing
Easting
DLeg
V. See
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(weft)
(usft)
(usft)
(°/100usft)
(usft)
11,182.25
66.70
54.10
8,789.76
8,712.85
926.48
6,215.14
5,951,176.136
669,926.826
15.39
6,242.41
11,214.22
66.70
53.60
8,802.40
8,725.49
943.80
6,238.85
5,951,193.967
669,950.154
1.44
6,269.8f
11,245.14
66.20
52.90
8,814.76
8,737.85
960.76
6,261.57
5,951,211.415
669,972.489
2.63
6,296.14
11,276.01
65.70
53.50
8,827.34
8,750.43
977.65
6,284.14
5,951,228.787
669,994.687
2.40
6,322.33
11,306.33
65.70
53.30
8,839.82
8,762.91
994.13
6,306.32
5,951,245.741
670,016.507
0.60
6,348.03
11,337.90
65.60
52.50
8,852.83
8,775.92
1,011.47
6,329.26
5,951,263.583
670,039.062
2.33
6,374.69
11,369.82
65.70
52.50
8,865.99
8,789.08
1,029.18
6,352.33
5,951,281.763
670,061.741
0.31
6,401.57
11,401.98
65.40
52.20
8,879.30
8,802.39
1,047.06
6,375.51
5,951,300.164
670,084.524
1.26
6,428.60
11,425.50
65.90
51.80
8,889.00
8,812.09
1,060.25
6,392.40
5,951,313.720
670,101.117
2.63
6,448.33
11,463.17
67.20
46.20
8,904.00
8,827.09
1,082.46
6,418.86
5,951,336.501
670,127.090
9.42
6,479.66
11,494.82
70.10
41.80
8,915.53
6,838.62
1,103.30
6,439.68
5,951,357.788
670,147.447
20.94
6,505.17
11,524.60
73.80
36.20
8,924.76
8,847.85
1,125.30
6,457.47
5,951,380.167
670,164.759
21.77
6,528,08
TIP
11,547.00
75.21
32.88
8,930.75
8,853.84
1,143.08
6,469.71
5,951,398.207
670,176.603
15.61
6,544.51
KOP-TOWS
11,550.00
74.70
32.55
8,931.52
8,854.61
1,145.52
6,471.27
5,951,400.678
670,178.115
20.00
6,546.66
4112'
11,570.18
71.31
30.26
8,937.42
8,860.51
1,161.99
6,481.33
51951,417.358
670,187.811
20.00
6,560.6,
Interpolated
Azimuth
11,600.30
66.56
26.71
8,948.25
8,871.34
1,186.67
6,494.74
5,951,442.328
670,200.680
19.22
6,580.01
Interpolated
Azimuth
11,630.12
63.33
22.99
8,960.88
8,883.97
1,211.17
6,506.10
5,951,467.067
670,211.503
15.65
6,597.34
Interpolated
Azimuth
11,660.21
59.99
18.97
8,975.16
8,898.25
1,235.88
6,515.59
5,951,491.977
670,220.454
16.17
6,612.93
11,680.94
56.33
22.29
8,986.10
8,909.19
1,252.36
6,521.79
5,951,508.585
670,226.286
22.29
6,623.19
11,710.61
59.02
27.59
9,001.97
8,925.06
1,275.07
6,532.37
5,951,531.521
670,236.370
17.60
6,639.31
11,740.80
65.78
32.64
9,015.96
8,939.05
1,298.17
6,545.81
5,951,554.907
670,249.305
26.84
6,658.29
11,770.28
68.60
37.42
9,027.39
8,950.48
1,320.41
6,561.41
5,951,577.474
670,264.417
17.74
6,679.13
6282017 2:17.30PM Page 10 COMPASS 5000 1 Build 81D
bBP I
p Final Survey Report BAKER
HUGHES
Company: North America - ALASKA - BP
Local Co-ordinate
Reference:
Well B-36
Project: Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING
@ 76.91usft (DOYON 16)
Site: PB B Pad
MD Reference:
ORIG KELLY BUSHING @ 76.9lusft (DOYON 16)
Well: 8-36
North Reference:
True
Wellbore: B -36A
Survey Calculation Method:
Minimum Curvature
Design: 8-36A
Database:
EDM RSK- Alaska
PROD -ANCP1
Survey
MD Inc
Azi(azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Seo
(usft) (°)
(°)
(usft)
(usft)
(usft)
lust[)
(usft)
(usft)
(°1100usft)
(usft)
11,800.58
71.15
43.41
9,037.82
8,960.91
1,342.05
6,579.65
5,951,599.507
670,282.382
20.38
6,702.57
11,830.22
75.04
48.13
9,046.45
8,969.54
1,361.81
6,600.17
5,951,619.706
670,302.265
20.11
6,727.32
11,860.08
80.22
53.51
9,052.85
8,975.94
1,380.21
6,822.77
5,951,638.594
670,324.458
24.71
6,753.93
11,890.44
87.36
55.85
9,056.13
8,979.22
1,397.65
6,647.38
5,951,656.558
670,348.683
24.73
6,782.22
11,920.06
92.49
59.62
9,056.17
8,979.26
1,413.45
6,672.41
5,951,672.901
670,373.365
21.49
6,810.50
11,949.92
99.47
62.68
9,053.06
8,976.15
1,427.77
6,698.40
5,951,687.786
670,399.035
25.50
6,839.32
11,981.53
98.46
68.01
9,048.13
8,971.22
1,440.79
6,726.77
5,951,701.417
670,427.110
16.96
6,870.10
12,016.15
91.29
71.16
9,045.19
8,968.28
1,452.81
6,759.08
5,951,714.134
670,459.144
22.61
6,904.41
12,041.06
91.32
74.91
9,044.62
8,967.71
1,460.08
6,782.89
5,951,721.915
670,482.794
15.05
6,929.30
12,070.75
88.62
77.84
9,044.64
8,967.73
1,467.07
6,811.74
5,951,729.533
670,511.482
13.42
6,958.97
12,101.10
88.77
83.79
9,045.33
8,968.42
1,471.91
6,841.68
5,951,735.024
670,541.307
19.61
6,989.14
12,130.68
90.46
62.94
9,045.53
8,968.62
1,475.33
6,871.06
5,951,739.080
670,570.603
6.40
7,018.40
12,159.98
91.81
79.35
9,044.95
8,968.04
1,479.84
6,900.00
5,951,744.216
670,599.436
13.09
7,047.52
12,190.16
90.89
76.65
9,04423
8,967.32
1,486.11
6,929.51
5,951,751.129
670,628.800
9.45
7,077.65
12,223.18
89.97
72.68
9,043.99
8,967.08
1,494.84
6,961.35
5,951,760.549
670,660.437
12.34
7,110.66
12,253.01
89.32
69.60
9,044.17
8,967.26
1,504.48
6,989.57
5,951,770.802
670,688.443
10.55
7,140.42
12,282.17
88.65
66.64
9,044.69
8,967.78
1,515.34
7,016.62
5,951,782.251
670,715.250
10.41
7,169.36
12,310.80
88.40
63.80
9,045.42
8,968.51
1,527.34
7,042.60
5,951,794.607
670,740.964
9.95
7,197.57
12,340.52
89.35
61.73
9,046.01
8,969.10
1,540.94
7,069.02
5,951,808.975
670,767.079
7.66
7,226.61
12,372.39
90.18
58.41
9,046.14
8,969.23
1,556.83
7,096.64
5,951,825.469
670,794.340
10.74
7,257.41
12,404.37
89.20
54.76
9.046.31
8,969.40
1,574.44
7,123.33
5,951,843.652
670,820.637
11.82
7,287.76
12,430.65
90.18
52.64
9,046.45
8,969.54
1,590.00
7,144.50
5,951,859.665
670,841.470
8.89
7,312.25
12,460.46
89.14
51.40
9,046.63
8,969.72
1,608.34
7,168.00
5,951,878.514
670,864.560
5.43
7,339.71
12,490.52
90.43
45.22
9,046.74
8,969.83
1,628.33
7,190.44
5,951,898.979
670,886.554
21.00
7,366.56
12,520.89
91.63
42.22
9,046.20
8,969.29
1,650.27
7,211.42
5,951,921.371
670,907.054
10.64
7,392.53
12,550.88
91.90
38.97
9,045.27
8,968.36
1,673.03
7,230.92
5,951,944.547
670,926.056
10.87
7,417.27
12,580.60
90.12
35.80
9,044.75
8,967.84
1,696.63
7,248.96
5,951,968.539
670,943.576
12.23
7,440.83
6282017 2:1730PM
Page 11
COMPASS
5000.1 Build 81D
Survay
BP
IGFlu
Zit
Final Survey Report
HUGHES
HUGHES
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well B-36
Project:
Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Site:
PB 8 Pad
MD Reference:
ORIG KELLY BUSHING (off 76.91usft (DOYON 16)
Well:
8-36
North Reference:
True
Wellbore:
B -36A
Survey Calculation Method:
Minimum Curvature
Design:
B -36A
Database:
EDM RSK- Alaska PROD -ANCP1
Survay
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
(uaft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usR)
(usft)
12,610.98
90.34
31.81
9,044.63
8,967.72
1,721.87
7,265.86
5,951,994.138
670,959.921
13.15
7,463.70
12,640.50
90.49
28.98
9,044.41
8,967.50
1,747.33
7,280.79
5,952,019.914
670,974.296
9.60
7,484.7
12,670.38
91.14
23.91
9,043.99
8,967.08
1,774.07
7,294.10
5,952,046.937
670,987.011
17.10
7,504.53
12,700.55
90.15
19.84
9,043.65
8,966.74
1,802.06
7,305.33
5,952,075.163
670,997.637
13.88
7,522.66
12,730.51
90.28
15.79
9,043.54
8,966.63
1,830.58
7,314.50
5,952,103.871
671,006.178
13.52
7,538.92
12,760.35
93.41
18.03
9,042.58
8,965.67
1,859.11
7,323.17
5,952,132.580
671,014.227
12.90
7,554.70
12,790.71
93.75
22.13
9,040.68
8,963.77
1,887.56
7,333.57
5,952,161.251
671,024.006
13.52
7,572.14
12,820.31
91.29
25.71
9,039.38
8,962.47
1,914.59
7,345.56
5,952,188.528
671,035.402
14.66
7,590.74
12,850.97
91.14
29.17
9,038.73
8,961.82
1,941.79
7,359.68
5,952,216.027
671,048.930
11.29
7,611.44
12,881.65
93.66
32.34
9,037.44
8,960.53
1,968.13
7,375.35
5,952,242.697
671,064.023
13.19
7,633.42
12,912.00
94.89
36.08
9,035.18
8,958.27
1,993.15
7,392.37
5,952,268.084
671,080.486
12.94
7,656.35
12,940.57
94.06
37.40
9,032.95
8,956.04
2,015.97
7,409.40
5,952,291.272
671,097.022
5.45
7,678.73
12,970.52
91.75
39.25
9,031.43
8,95452
2,039.44
7,427.95
5,952,315.131
671,115.053
9.88
7,702.74
13,000.82
90.21
43.39
9,030.91
8,954.00
2,062.18
7,447.95
5,952,338.306
671,134.550
14.58
7,727.96
13,030.25
89.69
47.84
9,030.94
8954.03
2,082.76
7,468.98
5,952,359.338
671,155.123
15.22
7,753.61
13,061.08
87.60
49.54
9,031.67
8,954.76
2,103.11
7,492.12
5,952,380.179
671,177.822
8.74
7,781.25
13,090.80
89.08
51.74
9,032.53
8,955.62
2,121.95
7,515.09
5,952,399.512
671,200.373
8.92
7,808.3:
13,120.75
90.74
55.24
9,032.58
8,955.67
2,139.76
7,539.16
5,952,417.845
671,224.046
12.93
7,836.20
13,150.91
93.81
57.92
9,031.38
8,954.47
2,156.36
7,564.31
5,952,434.983
671,248.825
13.51
7,864.79
13,180.14
98.13
60.66
9,028.34
8,951.43
2,171.20
7,589.29
5,952,450.366
671,273.479
17.47
7,892.78
13,210.83
102.02
62.11
9,022.97
8,946.06
2,185.67
7,615.81
5,952,465.408
671,299.675
13.50
7,922.14
13,240.52
104.84
64.19
9,016.08
8,939.17
2,198.72
7,641.57
5,952,479.008
671,325.143
11.69
7,950.41
13,271.06
.109.97
67.64
9,006.94
8,930.03
2,210.61
7,668.16
5,952,491.481
671,351.462
19.96
7,979.17
13,300.39
112.03
70.99
8,996.43
8,919.52
2,220.29
7,693.77
5,952,501.710
671,376.852
12.77
8,006.42
13,335.72
111.51
76.48
8,983.32
8,906.41
2,229.47
7,725.25
5,952,511.574
671,408.125
14.50
8,039.20
13,365.24
108.80
79.50
8,973.14
8,896.23
2,235.23
7,752.35
5,952,517.921
671,435.093
13.28
8,066.87
13,390.64
108.54
83.77
8,965.01
8,888.10
2,238.73
7,776.15
5,952,521.936
671,458.810
15.96
8,090.76
6128/2017 2.17.30PM Page 12 COMPASS 5000.1 Build 81D
Z. _r ��
Final
BF
Survey Repot
US Fag
AKER
HUGHES
Company: North Amenca
- ALASKA - BP
Local Coordinate
Reference:
Well B-36
Project: Prudhoe Bay
ND Reference:
ORIG KELLY BUSHING @ 76.91
usft (DOYON 16)
Site: PB B Pad
MD Reference:
ORIG KELLY BUSHING @ 76.91
usft (DOYON 16)
Well: 8-36
North Reference:
True
Wellbore: B -36A
Survey Calculation
Method:
Minimum Curvature
Design: B -36A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°/100usft)
(usft)
13,421.04
109.73
89.46
8,955.04
8,878.13
2,240.43
7,804.80
5,952,524.259
671,487.419
18.11
8,118.87
13,450.37
110.29
94.49
8,944.99
8,868.08
2,239.48
7,832.34
5,952,523.911
671,514.964
16.23
8,145.21
13,480.21
109.61
99.92
8,934.81
8,857.90
2,235.96
7,860.15
5,952,520.998
671,542.846
17.26
8,171.16
13,510.18
109.32
103.95
8,924.82
8,847.91
2,230.12
7,887.79
5,952,515.758
671,570.604
12.71
8,196.33
13,535.16
109.93
103.04
8,916.43
8,839.52
2,224.63
7,910.67
5,952,510.767
671,593.595
4.21
8,217.00
13,570.26
111.95
103.52
8,903.88
8,826.97
2,217.10
7,942.57
5,952,503.934
671,625.653
5.89
8,245.85
13,602.40
113.76
100.14
8,891.40
8,814.49
2,211.02
7,971.55
5,952,498.490
671,654.756
11.21
8,272.25
13,635.31
113.47
99.44
8,878.21
8,801.30
2,205.90
8,001.27
5,952,494.011
671,684.573
2.14
6,299.62
13,656.40
112.19
99.39
8,870.03
8,793.12
2,202.72
8,020.44
5,952,491.249
671,703.812
6.07
8,317.31
13,697.OD
112.19
99.39
8,854.70
8,777.79
2,196.58
8,057.53
5,952,485.925
671,741.023
0.00
8,351.53
2 718"
13,702.00
112.19
99.39
8,852.81
8,775.90
2,195.83
8,062.10
5,952,485.269
671,745.606
0.00
8,355.74
Projection to 7D
Casing Points
Measured
Vertical
Casing Hole
Depth
Depth
Diameter Diameter
(usft)
(usft)
Name
(in) (in)
13,697.00
8,854.70
27/8'
2.875 4.250
11,550.00
8,931.52
4117'
4.500 7.000
6/282017 2A7:30PM Page 13 COMPASS 5000.1 Build 81D
z by BP Was
Final Survey Report
Z_ HUGHES
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well B-36
Project
Prudhoe Bay
TVD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Site:
PB B Pad
MD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Well:
B-36
North Reference:
True
Wellbore:
B -36A
Survey Calculation Method:
Minimum Curvature
Design:
B -36A
Database:
EDM RSK-Alaska PROD -ANCP1
Design Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
.NI -S
+E1 -W
(usft)
(usft)
(usft)
(usft)
Comment
11,524.60
8,924.76
1,125.30
6,457.47
TIP
11,547.00
8,930.75
1,143.08
6,469.71
KOP-TOWS
11,570.18
8,937.42
1,161.99
6,481.33
Interpolated Azimuth
11,600.30
8,948.25
1,186.67
6,494.74
Interpolated Azimuth
11,630.12
8,960.88
1,211.17
6,506.10
Interpolated Azimuth
13,702.00
8,852.81
2,195.83
8,062.10
Projection to TO
Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes
6/28@017 2 17,30PM Page 14 COMPASS 5000.1 Build 61D
THE STATE
°fALASKA
GOVERNOR BILL WALKER
John Egbejimba
Engineering Team Leader
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
333 west Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.00gcc.aloska.gov
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B -36A
BP Exploration (Alaska), Inc.
Permit to Drill Number: 217-073
Surface Location: 4751' FSL, 1894' FEL, SEC. 31, TI IN, R14E, UM
Bottomhole Location: 1686' FSL, 930' FWL, SEC. 28, TI IN, R14E, UM
Dear Mr. Egbejimba:
Enclosed is the approved application for permit to re -drill the above referenced development well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner
DATED this L�day of June, 2017.
STATE OF ALASKA
-ASKA OIL AND GAS CONSERVATION COMMISE
PERMIT TO DRILL
20 AAC 25.005
1a. Type of Work:
1b. Proposed Well Class: Exploratory -Gas ❑ Service -WAG ❑ Service - Disp❑
1c. Specify if well is proposed for:
Drill El Lateral ❑
Stratigmphic Test ❑ Development - Oil O- Service-Winj ❑ Single Zone Ri•
lExplomtDry-Oil
Coalbed Gas ❑ Gas Hydrates❑
Redrill ®• Reentry ❑
❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket IZ ' Single Well ❑
11. Well Name and Number.
BP Exploration (Alaska), Inc RECEiVon
Bond No. 295105380 •
PBU B -36A
3 Address:
6. Proposed Depth:
12. Field/Pool(s):
!, C
MAY U 5 29
P.O. Box 196612 Anchorage, AK 99519-6612
MD: 13672' • TVD: 8785ss
PRUDHOE BAY, PRUDHOE
OIL -
4a. Location of Well (Governmental Section). AOG11
`
7. Property Designation (Lease Number):
1'e�y
ADL 028310 & 028309 -
Surface: 4751' FSL, 1894' FEL, Sec. 31, T11N, R14E, UM
8 Land Use Permit.
13. Approximate spud date:
Top of Productive Horizon: 338 FSL, 4030' FWL, Sec. 29, T1 IN, R14E, UM
89-034
July 1, 2017 .
Total Depth: 1686' FSL, 930' FWL, Sec. 28, T11 N, R14E, UM
9. Acres in Property: 2491 & 2560
14. Distance to Nearest Property:
7158
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL: 76.91- feet
15. Distance to Nearest Well Open
Surface: x- 663734 - y- 5950115 • Zone - ASP 4
GL Elevation above MSL: 42.3 - feet
to Same Pool:
7
16. Deviated wells: Kickoff Depth: 11550 • feet
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 110 degrees
Downhole: 3318 ' Surface: 2421
18. Casing Program: Specifications
Top - Setfng Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casin Weight Grade Cou lin Len h
MD TVD TVD includin stage data
4-1/2" 3-1/2"x31/4" 9.3#/6.5# 13Cr85 STL/TCIt 2671'
11000' 8642',, 13671• 8785',, 140 sx Class'G'
z2-7/8" /6.4# ISTI
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (f):
Plugs'assured):
Effect. Depth MD (ft):
Effect. Depth TVD (ft):
Junk (measured):
12691 9095
12400
12400
9037
12580
Casing Length size Cement Volume MD TVD
Conductor/Structural 78 20' 260 ax Arctic Set (Approx.) 36-114 36-114
Surface 3613 9-5/8" 1375 sx CS III, 335 sx Class'G% 300 sx CS II 36-3649 36-3340
Intermediate 10790 7" 225 sx Class'G' 33-10823 33-8609
Production
Liner 2077 4-1/7 236 sx Class'G' 10614 -12691 8455-9095
Perfomtion Depth MD (ft): 11590 -12520 Perforation Depth TVD (ft): 8943-9053
20. Attachments Property Plat ❑ BOP Sketch ® Drilling Program ® Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program ® 20 AAC 25.050 requirements m
21. Verbal Approval: Commission Representative:
Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Ciolkosz, Ryan R
from without prior written approval.
Email Ryan.Ciolkoszabp.com
Printed Name John Egbejimba Title Engineering Team Leader- CTD & RWO
Signature Phone +1 907 564 4139 Date 5 $
Commission use Use Only
PermiNumb r: Drill_ 73
Number: 7
API Number: 50- 029-22667-01-00
Permit Approval
Dere:
See cover letter for other
requirements:
Conditions of approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: ET
Other: gap -r-r-:5/ J v 35ZICIP t, Samples req'd: Yes ❑ No 113 Mud log mq'd: Yes ❑ No Ed"
142S measures Yes No ❑ Directional svy req'd: Yes No ❑ ,
�y r 44 r h rt K-( k
nt-f,
J--�5d— � 5-0 U 1' y(_q Spacing exception mq'd: Yes ❑ No Inclination -only svy mq'd: Yes ❑ No .N]J
/
J Post initial injection MIT mq'd: Yes ❑ No
APPROVED BY /'
Approved t COMMISSIONER THE COMMISSION t,/;v
pate:6/
OFo 10001 Revised 11/2015 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) Submit Forth and
Duplicate
�sl�/�
To: Alaska Oil & Gas Conservation Commission
From: Ryan Ciolkosz1Wi
CTD Engineer 0, S
Date: May 4, 2017
Re: B -36A Permit Approval
Permit approval is requested drill an Ivishak horizontal well from the B-36 wellbore
Well was initially completed in the Ivishak in June 1996 and new tubing was installed in 2006 with Rig workover
However, there is no remaining opportunity in parent bore
Proposed plan: Drill a through tubing sidetrack with the CDR 2 Coiled Tubing Drilling rig on or around July
1st, 2016. Coil tubing unit will set a CTD whipstock. CDR 2 will mill a 3.80" window in the 4-1/2" liner and drill
an Ivishak well to —13,671 ' MD. The lateral will be completed with a 3-1/2" x 3-1/4'x 2-7/8" 13Cr-80 liner
which will be cementedand perforated.
The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of
the current wellbore and proposed sidetrack is attached for reference.
CTD Drill and Complete B -36A program: Rip Start Date: July 1st 2017
Pro -Rig Work scheduled to begin May 15th, 2017
C
1
Mill N. Set Snap Lock Orienter, Set Whipstock
V
5
Set TWC. CTD Tree Work
Rig Work:
1. MIRU and test BOPE. Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,421 psi.
2. Mill 3.80" window plus 10' of rathole. Swap the well to 8.5-9.5 ppg drilling fluid.
3. PU drilling BHA with GR/Resistivity
4. Drill 4.25" hole to TD.
5. Run 3-1/2"x3-1/4" x 2-7/8" 13CR-80 liner.
6. Pump primary cement bringing TOC to TOL, 29 bbls of 15.3 ppg liner cmt planned*
7. Freeze protect well, RDMO
Post Rig:
1. V: Tree work as necessary.
2. F: Liner Lap Test
3. C: RPM and Perforate
4. S: Install LTP if necessary.*
5. F: Pressure test Liner top packer ✓
* Approved alternate plug placement per 20 AAC 25.112(1)
Mud Program:
• Well kill: 8.4-8.6 ppg brine.
• Milling/drilling: 8.4-9.5 ppg Power Pro for milling window and drilling
Disposal:
• All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
• All Class I wastes will go to Pad 3 for disposal. .
Hole size: 4.25"
Liner Program:
• 3-1/2", 9.3# 13Cr-85 STL Liner 11,000 MD - 11,500 MD
• 3-1/4", 6.5# 13Cr-85 TCII Liner 11,500 MD — 11,900 MD
• 2-7/8" 6.4# 13Cr-85 STL 11,900' MD- 13,671 MD
• The primary barrier for this operation: a minimum EMW of 8.4 ppg.
• A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi.
• The annular preventer will be tested to 250 psi and 3,500 psi.
Directional
• See attached directional plan.
• Magnetic and inclination surveys will be taken every 30 ft.
• Distance to nearest property — 27,158
• Distance to nearest well within pool - 70'(B -27C)
Logging
0 MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section.
Perforating:
• 2" guns, 6 spf, pert guns
• The primary barrier for this operation: a minimum EMW of 8.4 ppg. -
• A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Anti -Collision Failures /
• There are no wells that fail "Major Risk" with the B -36A wellpath. ✓
Hazards %
• DS B -pad is an H2S pad
• Low Risk of lost circulation
• No anticipated fault crossing
Reservoir Pressure
• The reservoir pressure on B -36A is expected to be 3318 psi at 8977' TVDss. (7.11 ppg equivalent).
• Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,421 psi.
Managed Pressure Drilling ✓
• MPD techniques may be used to improve hole stability.
• An automatic choke will maintain a target ECD at the window for the duration of drilling to improve hole
stability.
• A pressure schedule will be used for tripping In/Out of the hole. The purpose of the pressure schedule for
tripping is to maintain the same bottom hole pressure at the window by applying surface pressure via the
choke.
• At all times, drilling fluid weight will be greater than equivalent pore pressure. MPD is only being used for
hole stability.
Ryan Ciolkosz CC: Well File
CTD Engineer Joseph Lastufka
TREE= CNV
WE.LFEAD=
FMC
ACTLATOR=
BAKERC
OKB. 6-21=
76.91'
BF. flEV =
44.4'
KOP=
1250'
Max Angle = 86" @ 11935'
Datum MO=
11389'
DatumTVD=
88WSS
20- CONDUCTOR
91.5#, H-40,
D =19.124"
7" CSG, 26#, L-80 BTC, D = 6.276-
9-5/8" CSG 40#, L-80 BTC, D = 8.635"
Minimum ID = 3.725F'@ 10608'
4-1/2" HES XN NIPPLE
& JFE BEAR .0152 bpf, D = 3.958"
4-12" TBG STUB (09/09
PERFORATION SUMMARY
REE LOG: BFDS ON 05/18/96
ANGLE AT TOP PERF: 82" Q 12180'
Note: Refer to Pfoduction DB for historical pert data
SIZE
SPF
INTERVAL
Opn/Sgz
SHOT
SOZ
3-3V
6
11590-11610
S
0724196
06107/14
3-318"
6
11670- 11680
S
0724/96
06/07/14
2-718"
6
11750- 11780
S
02/16/00
06/07!14
2-718'
6
1218)-12210
O
02/02!16
BK
33V
6
12490 - 12520
C
06/02/96
B-36
[SA'NOTES: WELL ANGLE> 70 @ 11495'***
CHROME TBG, CSG & LINER"`
2DW —14-1/2- HES X NP, D = 3.8
3193' 7" HES ES a NTH2
3205' 9-5/8"X7" BKR EC PKR
GAS LIFT MANDRR-S
ST
MVTVD
10614'
10' TNVTE-BACK SLV, D= 5241"
TYPE
VLV
LATCH
PORE
DATE
4
38KGB2
0620114 PJC LNR TOFYPERF CORRECTION
DOME
BK
16
06/13114
3
69KG82
SO
8K
20
06113/14
2
89KGB2
DMY
BK
0
09110108
102KGB2
DMP'
BK
0
09110/08
10374' H7" X 4-12" BKR S3 PKR D = 3.870"
10557 -14-12- HBS X 1I, D = 3.813"
10564' H 7- X 4-12" BKR S-3 PIOZ D = 3.875-
1060F —j4-112"
HES XN NP, D= 3.725"
10614'
10' TNVTE-BACK SLV, D= 5241"
10620'
4-1/2" wLEG, D = 3.958'
7" X 4-12" TNV DOVE TA
HYDRO HGR, D = 3.915"
124W 1-14-12" WFD COP (02102/16)
/ 12590' CTM18F,1 H - MLL® WFD COP
/ FASORLL (06/11/14)
DATE REV BY COMMENTS
DATE REV BY OOMABNTS
0522196 N28E ORIGINAL COMPLETION
02115/16 JTC/JIuD SET CBP/ADPERFS (02/02/16)
09104106 D16 RWO
09111/08 D16 RWO
06/17/14 JCF/JMD CMT SOZ/MLL CBP(617-11!14)
06/17/14 WECJJbD GLV C!O (06/13/14)
0620114 PJC LNR TOFYPERF CORRECTION
PRUDHOE BAY UNIT
WELL' B36
PE RM! No: 1960650
AR No: 50-029-72667-00
SEC 31, T11 K R14E, 529' FPL & 1894'
BP Exploration (Alaska)
TREE= aw
VYBLHEAD= FMC
ACTUATOR= BAKERC
OKB. TLE/ = 76.91'
BF. TLEV = 44.4'
KOP= 1250
Max Angie 86'
Daban ku
Datum
B-s6A Proposed
= 11935'
= 11389'
N
91.5#, H-40,
D =19.124'
1TVDIDEVITYPE1
D= 8800SS
10620'
T CSG, 26#, L-80 BTC, D = 6.276"
ILATEHIPaRri
DATE
4
9-5/8" CSG, 40111, L-80 BTC, D = 8.835'
3641
43
KG62
7" CSG, 26#, L -BO BTGM, D = 6276"
873:
16 06!13/14
3
Minimum ID = 3.7256'@ 10608'
4-1/2" HES XN NIPPLE
5706
42
KGB2
4-12' TBG, 12.6#, 13CR80 VAM TOP
& JFE BEAR .0152 bOf. D= 3.958'
1051'
PERFORATION SUMMARY
REF LOG: BHCS ON 05/18/96
ANGLE AT TOP PERF: 82' @ 12180'
Note: Refer to Pmdwfm DB for historical perf data
S12E SPF INTERVAL OpNsciz SHOT SOZ
3-3/8" 6 11590-11610 S 07/24/86 06/07/14
33/8' 6 11670-11680 S 07/24/96 06/07/14
2-7/8' 6 11750-11780 S 02116/00106/07/14
2-7/8' 6 12180 -12210 O 02/0216
33/8' 6 12490-12520 C 06`02!96
STOP OF 4-12' LNR
4-12' TBG, 12.6#, L-80, .0152 bpf, D = 3.958'
T CSG, 29#, 13CR W= D= 6.184'
11 4-1/2'LW
3.70 Baker Deployment Sleeve - 11,000'
3-1/2"X Nipple -11,010'
4-1/2" Whipstock -11,55(
4-1/2" CIBP - 11,580' MD -
12400' 4-12' YWD(BP(02/02/16)
12590'CTM FISH -MLLEE)WFDCBP
8 FASDRLL (06/11/14)
D = 3.953'
SAI / NOTES: W ELL ANGLE > 70 @ 11495' "'
CHROME TBG, CSG & LINIEFr--
2085'-14-12' HES X NP, D = 3.8
3183' 7" FES ES CEME NTER
3205' 9-5/8" X 7' BKR EC PKR
GAR I Fr MANIYIR C
ST
MD
1TVDIDEVITYPE1
10'TWTEBACKSLV,D=5.241'
10620'
VLV
ILATEHIPaRri
DATE
4
3804
3452
43
KG62
DOME
BK
16 06!13/14
3
6909
5706
42
KGB2
SO
BK
20 06/13114
2
8942
7209
42
KGB2
DMY
BK
0 09110/08
1
10266
8196
41
KGB2
I)MY
BK
0 09/10/08
10344'--�4-12' FE•.S X I4°, D= 3.613'
10374' 7" X 4-12' BKR S3 PM D = 3-870'
1� 4-12-HESX NP, D=3-813'
X 4-12' UNDUE O
12" FES X NP, D=
10664' H T X 4-12" BKR S-3 PKR D = 3.875'
105eT 4-12'I$XNP,D=3.613'
10608' I—j4-1/2'
FES XN NP, D= 3.725'
10614'
10'TWTEBACKSLV,D=5.241'
10620'
W2G. D5
j 10624' H 7' X 4 12" 7NV LTP, D = 3.861'
106'26' 7"X4-12'TIWDOVETAL
FIYDRO HGR D= 3.915"
3-1/2" 9.3# 13CR-80 STL -11,500' MD
,_---3-1/4" 6 4# 13CR-80 TCII -11,900' MD
RA Tag
RA Tag
2-7/8" 6.4# 13Cr-80 STL -13,671
DATE REV BY COMMENTS
DATE RE/ BY COMMBJTS
0522196 N28E ORIGINALCOMPLETR)N
02/15/16 JTO7JIJD SEE OBP/ADPBIFS(02/02/16)
09-1 DI6 RWO
-
08/11/08 016 RW
06/17/14 J55JM1) CMTS(OZ/MLLCBP(617-11/14)
06/17/14 WECJJM) GLV 00 (06113/14)
-05—C
06/20!14 LN2 TORPERF CORRECTION
FRUOFIOE BAY LW
VVaL B-36
T$&4T No: 1960650
AR No: 50-029-22667-00
SEC 31, T71 K R14E 529' FTL 81894' FEL
BP Exploration (Alas ka)
:� �=
IM
bpti0+0�
North America - ALASKA - BP
Prudhoe Bay
PB B Pad
B-36
B -36A
Plan: B -36A WP07
BP Coil Tubing Report
03 May, 2017
riFag
BAKER
HUGHES
BP
B -36A
IT .,
1044111t
b p
r
BAK
Company:
North America -ALASKA - BP
Project:
Prudhoe Bay
Site:
PB B Pad
Well:
B-36
Wellbore:
B -36A
Design:
B -36A WP07
BP
B -36A
R••
BP Coil Tubing Report
Easting:
BAK
Design
B -36A WP07 —
u..G�c
n
Local Co-ordinate Reference:
Well 8-36
Phase:
TVD Reference:
Mean Sea Level
Latitude:
MD Reference:
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
North Reference:
True
148° 40'31816 W
Survey Calculation Method:
Minimum Curvature
Ground Level:
Database:
EDM R5K-Alaska PROD -ANCP1
Dip Angle
Project Prudhoe Bay, GPB, PRUDHOE BAY
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Use AK 14267'158641 Using Well Reference Point
Map Zone: NAD27'OGP-Usa AK/ Alaska zone 4126734'1586, Using geodetic scale factor
Site PB B Pad, TR -11-14
Site Position:
From: Map
Position Uncertainty: 0.00 usft
Well B-36, B-36
Well Position +N/ -S 0.00 usft
+E/ -W 0.00 usft
Position Uncertainty 0.00 usft
Wellbore
B -36A
Magnetics
Model Name Sample Date
Easting:
BGGM2016 7/1/2017
Design
B -36A WP07 —
Audit Notes:
0.000
Version:
Phase:
Vertical Section:
Depth From (TVD)
Latitude:
(usft)
Easting:
-43 23
Northing:
5,946,440.220
usft Latitude:
70' 15' 36.475 N
Easting:
662,094.050
usft Longitude:
148' 41' 22.843 W
Slot Radius:
0.000
in Grid Convergence:
1.23 '
Northing:
5,950,114.741 usft
Latitude:
70' 16' 12.259 N
Easting:
663,733.740 usft
Longitude:
148° 40'31816 W
Wellhead Elevation:
43.23 usft
Ground Level:
42.30 usft
Declination
Dip Angle
Field Strength
1°I
1°I
InT)
17.81
80.99
57,547
1
PLAN
+N/ -S
(usft)
000
Tie On Depth:
+E/ -W
(usft)
0.00
11,463 17
Direction
1�1
7467
59/2017 3: 04: 23PM Page 2 COMPASS 5000.1 Build 81B
*0'BP
by
0.l
BP Coil
Tubing Report
BAKER•■
NUGNES
Company: North America - ALASKA - BP
Project: Prudhoe Bay
Local Co-ordinate Reference:
Well B-36
Site: PB Pad
TVD Reference:
Mean Sea Level
Well: 8-386
MD Reference:
ORIG KELLY BUSHING
a 76.91usft (DOYON 16)
Wellbore: B-3
North Reference:
True
Design: &389A WP07
Survey Calculation Method:
Minimum Curvature
Database:
EDM RSK- Alaska PROD -ANCP1
Survey Tool Program Date 5/3/2017
- - -
-- -
-- _--
From To
(usft) (usft)
Survey (Wellbore)
Tool Name
Description
211.85 11,463.171: MWD - Standard
(B-36)
MWD
MWD - Standard
11,463.17 13,671.93
8-36A WP07(B-36A)
MWD
MWD -Standard
Planned Survey
MID Inc
(usft) 11
AN
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sac
TFace
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
(^)
11,463.17
67.20
48.20
8,829.97
1,115.13
6,414.66
5,951,389.069
670,122.180
0.00
6,481.24
0.001
B-36 Actual Survey
11,494.82
70.10
41.80
8,841.50
1,135.97
6,435.48
5,951,390.355
670,142.537
20.94
6,506.83
-65.25
B-36 Actual Survey
11,500.00
70.73
40.81
8,843.24
1,139.64
6,438.70
5,951,394.090
670,145.677
21.77
6,510.90
-56.10
11,524.60
73.80
36.20
8,850.73
1,157.97
6,453.27
5,951,412.734
670,159.849
21.77
6,529.80
-55,77
B-36 Actual Survey TIP
11,550.00
75.40
32.43
8,857.48
1,178.19
6,467.07
5,951,433.251
670,173.204
15.63
6,548.46
-66.75
KOP
11,570.00
73.84
31.49
8,862.79
1,194.55
6,477.28
5,951,449.828
670,183.053
9.00
6,562.63
-150.00
End 9deg/100ft
11,600.00
68.16
27.94
8,872.55
1,219.17
6,491.35
5,951,474.739
670,196.580
22.00
6,582.70
-150.00
11,610.00
66.28
26.70
8,876.42
1,227.36
6,495.58
5,951,483.019
670,200.632
22.00
6,588.95
-148.84
6
11,671.68
53.14
22.78
8,907.48
1,275.56
6,517.92
5,951,531.691
670,221.922
22.00
6,623.24
-166.52
7
11,700.00
57.22
28.51
8,923.65
1,296.48
6,528.00
5,951,552.830
670,231.543
22.00
6,638.49
50.68
11,800.00
73.22
45.25
8,965.67
1,368.01
6,582.74
5,951,625.523
670,284.707
22.00
6,710.19
47.40
71,898.05
90.00
59.00
8,980.00
1,427.00
6,659.00
5,951,686.156
670,359.661
22.00
6,799.34
40,28
8
11,900.00
90.42
59.07
8,979.99
1,428.00
6,660.67
5,951,667.195
670,361.309
22.01
6,801.21
10.00
11,948.98 101.03
60.97
8,975.11
1,452.33
6,702.82
5,951,712.427
670,402.918
22.00
6,848.29
10.00
9
532017 3:04:23PM
Page 3
COMPASS 5000.1 Build 81B
el"s bp
BP
%�
BP Coil
Tubing Report
BAK R••
HUMES
Company: North America - ALASKA - BP
Local Co-ordinate
Reference:
Well 13-36
Project: Prudhoe Bay
ND Reference:
Mean Sea Level
Site: PB B Pad
MD Reference:
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
Well: B-36
North Reference:
True
Wellbore: B -36A
Survey Calculation
Method:
Minimum Curvature
Design: B -36A WP07
Database:
EDM RSK- Alaska PROD -ANCP1
Planned Survey
MD Inc
AN
TVDSS
IIS
E/W
Northing
Easting
DLeg
V. Sec
TFace
(usft) (°I
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100use)
(usft)
1°I
12,000.00
90.47
64.79
8,970.01
1,475.42
6,747.94
5,951,736.491
670,447.517
22.00
6,897.91
160.00
12,002.26
90.00
64.95
8,970.00
1,476.38
6,749.98
5,951,737.495
670,449.541
21.99
6,900.13
160.38
End 22deg/100R
12,100.00
90.00
76.68
8,970.00
1,508.43
6,842.14
5,951,771.547
670,540.969
12.00
6,997.48
90.00
12,162.26
90.00
84.15
8,970.00
1,518.79
6,903.48
5,951,783.234
670,602A72
12.00
7,059.39
90.00
11
12,200.00
90.00
79.63
8,970.00
1,524.11
6,940.84
5,951,789.368
670,639.299
12.00
7,096.82
-90.00
12,300.00
90.00
67.63
8,970.00
1,552.25
7,036.61
5,951,819.582
670,734.426
12.00
7,196.62
-90.00
12,400.00
90.00
55.63
8,970.00
1,599.69
7,124.43
5,951,866.915
670,821.192
12.00
7,293.86
-90.00
12,500.00
90.00
43.63
8,970.00
1,664.35
7,200.47
5,951,935.209
670,895.806
12.00
7,384.29
-90.00
12,600.00
90.00
31.63
8,970.00
1,743.41
7,261.41
5,952,015.568
670,955.005
12.00
7,463.96
-90.00
12,697.26
90.00
19.95
8,970.00
1,830.83
7,303.65
5,952,103.881
670,995.332
12.00
7,527.81
-90.00
12
12,700.00
90.00
20.28
8,970.00
1,833.40
7,304.60
5,952,106474
670,996.219
12.00
7,529.40
90.00
12,800.00
90.00
32.28
8,970.00
1,922.90
7,348.80
5,952,196.906
671,038.458
12.00
7,595.69
90.00
12,900.00
90.00
44.28
8,970.00
2,001.25
7,410.64
5,952,276.580
671,098.577
12.00
7,676.05
90.00
13,000.00
90.00
56.28
8,970.00
2,065.03
7,487.42
5,952,342.013
671,173.946
12.00
7,766.96
_
90.00
13,047.26
90.00
61.95
8,970.00
2,089.28
7,527.96
5,952,367.134
671,213.950
12.00
7,812.47
90.00
13
13,100.00
86.23
63.06
8,967.13
2,113.58
7,574.65
5,952,392.443
671,260.097
12.00
7,863.92
10.00
13,200.00
108.04
65.25
8,946.14
2,156.16
7,662.46
5,952,436.923
671,346.948
12.00
7,959.86
10.06
13,216.81
110.00
65.63
8,940.73
2,162.89
7,676.74
5,952,443.758
671,361.083
12.00
7,975.36
10.52
14
13,300.00
110.00
76.28
8,912.20
2,188.22
7,750.70
5,952,470.888
671,434.472
12.00
8,053.44
88.17
13,400.00
110.00
69.05
8,878.00
2,200.19
7,843.71
5,952,484.875
671,527.191
12.00
8,146.31
87.81
13,461.61
110.00
96.92
8,856.93
2,197.17
7,901.48
5,952,483.119
671,585.010
12.00
8,201.23
88.65
15
13,500.00
110.00
92.02
8,843.80
2,194.36
7,937.44
5,952,481.092
671,621.014
12.00
8,235.16
-89.16
5/3@017 3:04 23P
Page
COMPASS
5000.1 Build BIB
��
� ,:
by
BP
rias
%00414:
BP Coil Tubing Report
BAKER
HUMES
Company: North America -ALASKA -BP
Local Co-ordinate Reference:
Well B-36
Project: Prudhoe Bay
TVD Reference:
Mean Sea Level
Site: PB B Pad
MD Reference:
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
Well: B-36
North Reference:
True
Wellbore: B -36A
Survey Calculation Method:
Minimum Curvature
Design: B -36A WP07
Database:
EDM RSK- Alaska PROD -ANCP1
Planned Survey
MD Inc Azi
TVDSS
NIS EIW
Northing Easting
DLeg V. Sec
TFace
(usft) (1) (1)
(usft)
(usft) (usft)
)usft) (usft)
(°1100usft) (usft)
1°1
13,600.00 110.00 79.25
8,809.60
2,201.50 8,030.94
5,952,490.264 671,714.332
12.00 8,327.22
-87.81
13,671.93 110.00 70.06
8,785.00
2,219,37 8,096.05
5,952,509.541 671,779.034
12.00 8,394.74
-88.43
TD at 13671.93
5/3/2017 3: 04: 23PM Page 5
COMPASS 50001 Build 818
% b BP //.&6
10 p 8P Coil Tubing Report B"IR
HUGOM
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB B Pad
Well:
B-36
Wellbore:
B -36A
Design:
B -36A WP07
Targets
Target Name
-hitrmiss target Dip Angle
Shape (•)
Dip Dir. TVD
19 (usft)
+N/ -S +PJ -W
(usft) (usft)
B -36A T3 0.00 0.00 8,970.00 2,089.14
- plan misses target center by O.t4usft at 13047.23usft MD (8970.00 TVD, 2089.27 N, 7527.94 E)
- Point
B -36A T2 0.00 0.00 8,970.00 1,664.13
- plan misses target center by 0.29usft at 12500.00usft MD (8970.00 TVD, 1664.35 N, 7200.47 E)
- Point
B -36A Fault 3 0.00 0.00 0.00 3,925.38
- plan misses target center by 8979.19usft at 13671.93usft MD (8785.00 TVD, 2219.37 N, 8096.05 E)
- Polygon
Point 1 0.00 0.00
Point 0.00 -2,194.72
Point 0.00 -3,985.91
Point 0.00 -2,194.72
B -36A T4
0.00 0.00 8,785.00
2,218.83
- plan misses target center by 0.50usft at 13671.75usft MD (8785.01 TVD, 2219.31 N,
8095.88 E)
- Point
B -36A Polygon
0.00 0.00 0.00
1,502.26
- plan misses target center by 8844.18usft at 11463.17usft MD (8829.97 TVD, 1115.13 N, 6414.66 E)
- Polygon
Point 1
0.00
0.00
Point
0.00
357.50
Point
0.00
741.97
Point 4
0.00
853.42
Point 5
0.00
627.91
Point
0.00
432.95
Point
0.00
68.91
Point 8
0.00
-211.49
B -36A Fault 4 0.00 0.00 0.00 852.88
- plan misses target center by 8853.75usft at 11463.17usft MD (8829.97 TVD, 1115.13 N, 6414.66 E)
Polygon
P
7,528.01
7,200.86
8,830.35
0.00
-43.75
215.36
-43.75
8,098.00
6,733.00
0.00
441.91
701.35
1,418.00
1,484.11
1,019.73
602.68
111.43
5,821.60
Local Co-ordinate Reference: Well 8-36
TVD Reference: Mean Sea Level
MD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
North Reference: True
Survey Calculation Method: Minimum Curvature
Database: EDM R5K - Alaska PROD - ANCP1
Northing Easting
(usft) (usft) Latitude Longitude'
5,952,367.000 671,214.000 70° 16'32.769 N 148° 36' 53.611 W
5,951,935.000 670,896.000 70° 16'28.592 N 148° 3T 3.154 W
5,954,231.000 672,476.000 70° 16'50.814 N 148" 36'15.625 W
5,954,231.00 672,476.00
5,952,036.00 672,480.00
5,950,251.00 672,778.00
5,952,036.00 672,480.00
5,952,509.000 671,779.000 70° 16'34.038 N 148° 36'37.067 W
5,951,763.000 670,432.000 70° 16'27.0134 N 148° 37' 16.775 W
5,951,763.00 670,432.00
5,952,130.00 670,866.00
5,952,520.00 671,117.00
5,952,647.00 671,831.00
5,952,423.00 671,902.00
5,952,218.00 671,442.00
5,951,845.00 671,033.00
5,951,554.00 670,548.00
5,951,094.000 669,535.000 70° 16'20,625 N 148° 37'43.327 W
i
ont 1 0.00 0.00 0.00 5,951,094.00 869,535.00
Point 0.00 -137.97 2,984.91 5,951,021.00 672,522.00
B -36A Tl _ 0.00 0.00 8,980.00 1,426.84 6,659.34 _ _ 5,951,686.000 _ 670,360.000 70' 16'26.263 N 148° 37'18,922 W
5 O17 3.04:23PM Page 6 COMPASS 5000.1 Build 81B
i
ont 1 0.00 0.00 0.00 5,951,094.00 869,535.00
Point 0.00 -137.97 2,984.91 5,951,021.00 672,522.00
B -36A Tl _ 0.00 0.00 8,980.00 1,426.84 6,659.34 _ _ 5,951,686.000 _ 670,360.000 70' 16'26.263 N 148° 37'18,922 W
5 O17 3.04:23PM Page 6 COMPASS 5000.1 Build 81B
b BP RARE"00"'r p BP Coil Tubing Report BMER
HUGHES
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well B-36
Project: Prudhoe Bay
ND Reference:
Mean Sea Level
Site: PB B Pad
MD Reference:
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
Well: B-36
North Reference:
True
Wellborn: B -36A
Survey Calculation Method:
Minimum Curvature
Design: B -36A WP07
Database:
EDM RSK- Alaska PROD -ANCPl
- plan misses target center by 0.31 usft at 11898.28usft MD (8980.00 ND, 1427.11 IN, 6659.18 E)
- Point
B -36A Fault 2 0.00 0.00 0.00 2,284.50
8,755.63
5,952,589.000
672,437.000 70° 16'34.677 N 148° 36'l 7.857 W
- plan misses target center by 8809.97usft at 13671.93usft MD (8785.00 TVD, 2219.37 N. 8096.05 E)
- Polygon
Point 0.00 0.00
0.00
5,952,589.00
672,437.00
Point 0.00 -878.81
-848.38
5,951,692.00
671,608.00
B -36A Fault 5 0.00 0.00 0.00 3,144.95
7,183.87
5,953,415.000
670,847.000 70" 16'43 156 N 148'37'3,602 W
- plan misses target center by 8880.60usft at 13671.93usft MD (8785.00 TVD, 2219.37 N, 8096.05 E)
- Polygon
Point 1 0.00 0.00
0.00
5,953,415.00
670,847.00
Point 2 0.00 -933.29
-1,378.72
5,952,452.00
669,489.00
B -36A Fault 1 0.00 0.00 0.00 2,845.21
7,581.47
5,953,124.000
671,251.000 70° 16'40.204 N 148° 36'52.032 W
- plan misses target center by 8822.28usft at 13671.93usft MD (8785.00 TVD, 2219.37 N. 8096.05 E)
- Polygon
Point 1 0.00 0.00
0.00
5,953,124.00
671,251.00
Point 0.00 -13.48
1,263.09
5,953,138.00
672,514.00
Casing Points
-- -- - -- ---
Measured Vertical
Casing Hole
Depth Depth
Diameter Diameter
(usft) (usft) Name
(in) (in)
11,550.00 8,857.48 41/2"Planned TOWS
4.500 4.500
13,671.93 6,784.97 27/8"
2.785 4.250
&32017 3r04:23PM Page 7 COMPASS 5000.1 Build 81B
♦00 BP
;,,,,�
bp BP Coil Tubing Report BAHUGHES
KER
Company:
North America - ALASKA - BP
TVD Reference:
Mean Sea Level
MD Reference:
Project:
Prudhoe Bay
True
Survey Calculation Method:
Minimum Curvature
Database:
Site:
PB B Pad
Well:
B-36
Wellbore:
B -36A
Design:
B -36A WP07
Plan Annotations
-
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
11,463.17
8,829.97
1,115.13
6,414.66
B-36 Actual Survey
11,494.82
8,841.50
1,135.97
6,435.48
B-36 Actual Survey
11,524.60
8,850.73
1,157.97
6,453.27
B-36 Actual Survey TIP
11,550.00
8,857.48
1,178.19
6,467.07
KOP
11,570.00
8,862.79
1,194.55
6,477.28
End 9deg/100ft
11,610.00
8,876.42
1,227.36
6,495.58
6
11,671.68
8,907.48
1,275.56
6,517.92
7
11,898.05
8,980.00
1,427.00
6,659.00
8
11,948.98
8,975.11
1,452.33
6,702.82
9
12,002.26
8,970.00
1,476.38
6,749.98
End 22deg/100ft
12,162.26
8,970.00
1,518.79
6,903.48
11
12,697.26
8,970.00
1,830.83
7,303.65
12
13,047.26
8,970.00
2,089.28
7,527.96
13
13,216.61
8,940.73
2,162.69
7,676.74
14
13,461.61
8,856.93
2,197.17
7,901.48
15
13,671.93
8,78500
2,219.37
8,096.05
TD at 13671.93
Checked By: Approved By:
Local Co-ordinate Reference:
Well B-36
TVD Reference:
Mean Sea Level
MD Reference:
ORIG KELLY BUSHING @ 76.91 usft (DOYON 15)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Date:
SWO17 3:04:23PM Page B COMPASS 5000.1 Build BIB
�{"'\
N
ProlecL PrutlM1ce Bay
Site: B-36PH 8
Well: L4]6
u.PnoNw neaffAILS:
61y@CFW36A
aM 5386
B.36A
- - IEFea+celN,71,au
coae'inelelrul wlnmz wm B3eirvgµaB
aW15 Rett Neen 3w
-ppp/'.
_=_i
M
Wellbore: &36A
Phn:B-36AWP(l7(B-XB-WA)
WbAVw. 8].93
os..mrm
B-316
semen Ns6RHerena. swan O.wN,oaon
N,09
B�WO�R aaee GWGIQilYW6HNG®7691WAIOOYW 161
Nuem
__
66�a:
__
11463.1]
Celole4m Nd6M. Nirtm3n Wvawrt
WELL DETAILS: B36
B-36,076
E
S80()B-36A
Bi6Acvn15ory f1B
SECTIONDETAIS
Sec MD he Aa NTVD .NFS .ELW DleO TFm VSec1 Targe
1 11463.17 67.20 48.20 8929.97 1115.13 6414.66 0.00 0.00 6481.24
2 11494.82 70.10 41.80 8941.50 1135.97 6435.18 20.94 -65.25 6506.83
3 11524.60 73.80 3630 8850.73 1157.97 645127 21.77 -66.10 6529.80
4 11550.00 7810 32.43 8057.48 1178.19 6467.07 15.63 -66.75 6548.46
5 11570.00 73.84 31.49 8862]9 1194.55 647728 9.00 -150.00 656263
6 11610.00 66.28 26.70 887642 1227.36 6495.56 22.00 -150.00 6588.95
7 11671.68 5114 21.78 8907.48 127556 6517.92 22.00 -166.52 662124
8 1189805 90.00 59.00 8980.00 1427,00 6659.00 22.00 50.68 6798.34
9 1194898 101.03 60.97 8975.11 1452.33 6702,82 12.00 10.00 6848.29
10 12002.26 90.00 64.95 9970.00 1476.37 674898 22.00 160.00 6900.13
11 12162.26 90.00 84.15 8970.00 1518.79 690148 12.00 90.00 7059.39
12 12697.26 90.00 19.95 8970.00 1830.83 7303.65 1200 -90.00 7527.81
13 13047.26 90.00 61.95 8970.00 208828 7527.96 12.00 90.00 7812.47
14 13216.61 110.00 65.63 8940.73 2162.69 7676.74 12.00 10.00 7975.36
15 13461.61 110.00 96.92 8856.93 2197.17 7901.48 12.00 90.00 8201.23
16 13671.93 110.00 70.06 878800 1219.37 8096.05 12.00 -90.00 83974
Sad
ANNOTATIONS
TVD MD Anndaboa
8829.97 1146117 B-36AdualSumy
891.50 11494.82 B,MAdud Sumy
8850.73 11524.60 MAdual SUMYTIP
8857.48 11550.00 KOP
886279 11570.00 Erldg*110D0
8876,42 11610.00 6
8907.48 11671.68 7
8960.OD 1189605 8
8975.11 11948.99 9
1970.00 12002.26 End 22dey10pl
8970.00 12162.26 11
897D.00 12697.26 12
8970.00 13047.26 13
8910.73 13216.61 14
885893 13461.61 15
8785.00 13671.93 TD at 13671.93
2600�
2500 B -36A WP07
1
2600
1200'.
tial* 67W 68011 6900 7060 7100 72W 7300 7600 7500 7600 771* 78W 7900 8000 8100 SIM 83W 8aU1
West( -)/East(+) (100 usft/in)
8700-
8750
B-36,076
E
S80()B-36A
Bi6Acvn15ory f1B
WP07
KOP
B-J6'&36A
8850
Ed9dep/IWO.
TD.1367193
.�,
8900
6' -
15
L
7 B 36AT1
B 36A I2 B-36AT3
6
8950
d
t]
IJ
901*.
3 y Fsd22dep/IL*8 II
li 13
W
u
B W13 16
V
91150
9100
-
2
(-
9150
-
MedNy aLeWt
- - -
6500 655() 6600 6650 67W 6750 6860 6850 69W 6950 7600 7050 7100
7150 7200 7250 7300 73511
7600 7450 7500 7550 7600 7650 771* 7750 7800 7850 7900 7950 SOW 8050 81W 81511 82W MU 8300 8350 8000 06511
Vertical Section at 74.67'(50 usft/in)
Proieel: Pwhoe Bey
Bile: PB B Pad
Well: B -M
Wellbore: &36A
Plen:B36AWPB7(8-36113 6A)
NYnM¢ TinNpt
MytlkNNM1.t18
a�. m
me.mm
uom ecm®
WELLBORE DETAILS: B36A
rart#wfwaawnan
B -36A
� eA (Nfl6tlncas wd M Tau ..
vetitl(IVDlgebarce. Nen se tatl
Parent Wellbore: B36
emelve)6e�e. Sul. lnnon, 0 aael
Te an MD: 1fA63.t7
N I)Vl6aeeake. MIC KELLY euswxc V� 7691 IMYr 16)
ulmNan trema Nnrcahawre
ri.E
BAKER
HUGHES
1281
IIW
I0 d
WIO
IIW
]W
O NA
Mean Sea Level 58W 5Y0) 600) 610) 610) 630) 6A0) 65W 6EW '.. _ .. _ -...
bNp 68W fi900 ](100 ]IW ]2W ]300 ]4W ]SW )6W >]W ]tl011 ]Y(IU tl01N1 tlIW tl2(B 830) tl400 BSfB tl6W X]W tltlW 85Y10 YL1M1 YIW 92011 YVW Y900 45W
West( -)Bast(+) (100 usftlin)
t 0
AV
00)N by
Project:
Prudhoe Bay
Site:
PB B Pad
Well:
B-36
Wellbore:
B -36A
Plan: B -36A W P07 (B36/B-36A)
ANTI -COLLISION SETTINGS
COMPANY DETAILS: North America - ALASKA - BP
Interpolation Method: MD, Interval: 25.00 caomation Method: Minimum Curvature
Depth Range From: 11463.17 To 13671.93 Error System: ISCWSA
Results Limited By: Centre Distance: 1563.82 Scan Method: Trav, Cylinder North
Reference: Plan: B -36A WP07 (B -36/B -36A) Error Surface: Elliptical Conic
BAKER
HUGHES
LEGEND
&07, 0 07. &07 V1
£ &07, &WA B WA VO
F B D. &27C. 0,27C VO
B34&WBWVI
07-03, W -W, 07Y03A V1
0709, W WA, 07-09A W
- W 13, 0713C, 071= VO
- OR 13, 0743CPB1, 0713CPBt VO
s 0737, 07-W, 0737 W
b
p
Possible Magnetic Interference:
From KOP to 11,720' MD
Project: Prudhoe Bay I ANTI -COLLISION SETTINGS
Site: PB B Pad
COMPANY DETAILS: Norah Ani - ALASKA - BP
Well: B-36 Interpolation Method: MD, interval: 25.00
Depth Range From: 11463.17 To 13671.93
Wellbore: B -36A Results Limited By: Centre Distance: 1563.82
Plan: B -36A WP07(B-36/13-36A). Reference: Plan: B36A WP07 (B36/8 -36A)
Depth Range: 11463.17 To 13671.93 11From colour TOVID
463 11717
20
_._ 0 11720 12100
12100 13500
13500-__ -----13672
CplNactlr4o:
Jose Vazquez -Tech 6uppe1l
-. eo7 6€fpi✓Ji
a D 40
714478-4339 Cel Phone
6,307, e07n, ae7nv0
907-341-7604 Emergency
,. en, a M. 13, Dv0
YorehaRaglursingh-surveyManager
a3113,36 v1
907-342-2436 Cal Prime
. 070107074, 07 o(=v
Tai Slurdivant-DD Coordinator 2
0709, 97,364.07498 W
907dO5fi294 Cdl Phone D
01110' 130.47`1Xv
Pal>;ck Rider -JAWD Coordinew 100
07.1107 I=Pm. 0713
907-952-3497 CalPhan 180
W 37.0737, 07-37 W
Cad Ulrich - Operations ManagaAzimuth from North [ q vs Centre to Centre Separation
907-382-5534 Cel Phme [10 usft/in]
Error System: ISCWSA
Scan Method: Tray. Cylinder North
Ener Surface: Elgotical Conic
I/.&2
BAKER
HUGHES
ovum IwN: 4290
ON`a .eta N,.Mn6 FeNlnp IaIIroMe bnplWdg 4M
o.aa ON S%011a.]41 'g•,9122594
146.40'3381fiW
Sm - MD Inc - Aei TVD -.W-S .E/ -W Dleg TFace Yaw
1 11463.17 67.20 48.20 8829.97 1115.13 6414.66 0.00 0.00 6481.24
2 11494.82 70.10 41.80 8841.50 1135.97 6435.6 20.94 -65.25 6506.83
3 11524.60 7300 36.20 8850]3 1157.97 6453.27 21.77 -56.10 652980
4 11550.00 75.40 32.43 885/.48 1178.19 6467.07 15.63 -66.75 6546,46
5 11570.00 73.84 31.49 8862.79 1194.55 6477.28 9.97 -150.W 6562.63
6 11610.00 66.28 26,0 8876.42 1227.36 6495.58 22.00 4W.W 6560.95
7 11671.68 53.14 22.78 8907.48 1275,56 6517.92 22.97 466.52 6623.24
8 11898.05 90.00 59.00 8980.00 1427.00 6659.00 22.00 50.68 6798.34
9 11948.98 101.03 60.97 8975.11 1452.33 6702.82 22.00 10.W 684829
10 12002.26 9000 64.95 0970.00 1476.37 6749.98 22.00 180.00 6900.13
11 12162.26 90.00 84,15 8970.00 1518.79 6903.48 12.W 90.00 7059.39
12 12697.26 good 19.95 8970,00 1830.03 7303.65 12.00 -90.W 7527.81
13 13047.28 90.00 61.95 8970.00 2089.20 7527.96 12.00 90.00 7812.47
14 13216.61 110.00 65.0 8940,3 2162.69 7676.74 12.00 10.00 7975.36
15 13461.61 110.00 96.92 8856.93 2197.17 7901.48 12.00 90.00 8201.23
6UBVEYProGenra
6ffi:2J1]00]rW1Y1C0 VBWNd: I'N Vd9[n:
DqN Fmn IXgl, Te ar"M. T.
211.0 11463.17 I:M"-63xmw1e,361 MWD
11463.17 1367193 eEi WF071e3901 MWD
180
Azimuth from North[ I vs Centre to Centre Separation [40 usturin]
.0100.
S00
North America - ALASKA - BP
Prudhoe Bay
PB B Pad
B-36
B -36A
B -36A WP07
Travelling Cylinder Report
03 May,2017
BAKER
HUGHES
BP
/F&\
by Travelling Cylinder Report BAKER
�'r*�r
MGM
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB B Pad
Site Error:
0.00 usft
Reference Well:
B-36
Well Error:
0.00 usft
Reference Wellbore
B -36A
Reference Design:
B -36A Ili
Local Co-ordinate Reference
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well B-36
Mean Sea Level
ORIG KELLY BUSHING @ 76.91usft
(DOYON 16)
True
Minimum Curvature
1.00 sigma
EDM RSK- Alaska PROD -ANCP1
Offset Datum
teference
B -36A WP07
�ilter type:
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
From
lterpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
lepth Range:
11,463.17 to 13,671.93usft Scan Method:
Tray. Cylinder North
lesults Limited by:
Maximum center -center distance of 1,563.82 usft Error Surface:
Elliptical Conic
Survey Tool Program
Data 5/3/2017
'
From
To
Reference
Offset
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
211.85
11,463.17 1 : MWD - Standard (B-36)
MWD
MWD -Standard
Deviation
11,463.17
13,671.93 B -36A WP07(B-36A)
MWD
MWD -Standard
Distance
Casing Points
from Plan
Offset Well -Wellbore-Design
lush)
Measured Vertical
(usR)
Casing
Hole
Depth Depth
Diameter
Diameter
(usft) (usft)
Name
(in)
(in)
110.00 33.09 20"
20.000
26.000
B-04 - B -04A - B -04A
3,649.00 3,262.70 95/6"
9.625
12.250
10,823.00 8,531.75 7"
B-04 - B-04APB1 - B-04APB1
2000
8.500
11,550.00 8,857.48 4112" Planned TOWS
4.500
4.500
12,925.00
13,671.93 8,784.97 27/8"
1,396.46
2.785
4.250
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well -Wellbore-Design
lush)
(usft)
(usR)
(usft)
PB B Pad
B-04 - 8-04 - 8-04
Out of range
B-04 - B -04A - B -04A
Out of range
B-04 - B-04APB1 - B-04APB1
Out of range
B-07 - B-07 - B-07
12,925.00
12,150.00
1,396.46
482.59
941.61
Pass - Major Risk
B-07 - B -07A - B -07A
11,825.00
13,128.00
949.86
616.75
362.48
Pass - Major Risk
B-27 - B -27C - B -27C
11,617.88
12,475.00
100.83
32.73
75.63
Pass - Minor 1/200
B-28 - 8-28 - B-28
Out of range
B-30 - B -30A - B -30A
Out of range
8 -36 -B -36-B-36
11,770.37
11,775.00
70.40
2.09
70.40
Pass-NOERRORS
PB DS 07
07 -03 -07 -03A -07-03A
12,289.01
11,508.00
1,406.81
445.42
961.55
Pass - Major Risk
07-03 - 7-038 - 07-038 Plan #4
Out of range
07 -09 -07 -09A -07-09A
13,650.00
10,825.00
500.11
480.57
39.91
Pass - Major Risk
07-13 - 07-13C - 07-13C
12,875.00
14,075.00
899.76
412.69
518.21
Pass - Major Risk
07-13-07-13CPB1-07-13CPBI
12,975.00
13,725.00
987.72
445.20
572.05
Pass - Major Risk
07-37-07-37-07-37
13,425.00
11,725.00
1,070.89
617.60
461.80
Pass - Major Risk
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
aWO17 2.07:47PM Page 2 COMPASS 5",1 Build 81B
Rolm: Prudhoe Bay
Site: PB B Pad
Well: 8-36
Wellbore: B
Plan: B -36A W Po] PIus500h MD (BS6IB-WA)
$ $ 9 m m m
$ n e
5953230 B 07/8-07
5953140/
5953050
5952980
071T07g3CP
5952670
5952760
0713/0]430 S
5952690
5952800
5952510
p5952420-
5
05952330
5952240
z
z
5952150
x52080
5951970
5951880
5951790
595800
5951610
347/11 27CP62
5951430
5951340
0 0 0 0
Mean Saa Level
ARRU86iru W1
MpMk NaN:lid
u>oresorr
sssmos
m.:ma1
— nbu9mMU
WELLBORE DETAILS: B -MA
9Fwarx6P6daanax
B -36A
coa6noly lwt:l Bnnnm wa16J53MN-
Vn6m�R'/019Nnnre: NmnSm L♦W
Parent Wellbore: B-36
� NSIReleanm ft, (OMaw)
TIe On MD: 11463.1]
M°""ar oeph RO—,: p GKLLy683MNG@7691WPMO g16)
cuson lmna m�m�mowm..
Easting (90 ushnn)
S o 9 9 9 9
—
v m E u s a m m
0 0 $ 0 0 8 0 $ a o $
07-37107-37
B -36A WP07 Plus 500ft MD
36
8 27/8 2]C
w_.
0 0 o ge o o e o 0 0 0 0 0 o e
Easting(90 u5ivin)
0-36/0-36A WP07
0709/0709
07-09/07-09 PBI
�� �r/iuit a
Y®
9 9 9 9
\MD
- W07 -13A -__.5953230
5953140
30/07308 5953050
5852860
159528]0
x52760
5952890
B3NB36A WPO] 5952800
59x420 z
5952330.-
g
052240-
"52150
52240-59x150
I59520N
5951970
5951960
5951790
M1700
.x51610
5951520
5951430
5951340
0 o e
,,..0L,
Z = b
pp
N
North America - ALASKA - BP
Prudhoe Bay
PB B Pad
B-36
B -36A
B -36A WP07 Plus 500ft MD
AOGCC Offset Well Report
03 May,2017
F
ias
BAKER
HUGHES
BP /Gra2
Anticollision Report BAKM
HUGHU
Local Co-ordinate Reference:
Well B-36
1 by-e0+41,11"
Mean Sea Level
MD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB B Pad
Site Error:
000usft
Reference Well:
B-36
Well Error:
O.00usft
Reference Wellbore
B -36A
Reference Design:
B -36A WP07 Plus 500ft MD
BP /Gra2
Anticollision Report BAKM
HUGHU
Local Co-ordinate Reference:
Well B-36
TVD Reference:
Mean Sea Level
MD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
Norm Reference:
True
Survey Calculation Method:
Minimum Curvature
Output errors are at
1.00 sigma
Database:
EDM R5K - Alaska PROD - ANCP1
Offset TVD Reference:
Offset Datum
Reference
B -36A WP07 Plus 500ft MD
Filter type:
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
Interpolation Method;
MD Interval 25.00usft Error Model: ISCWSA
Depth Range:
11,463.17 to 14,171.93usft Scan Method: Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic
Survey Tool Program Date 5/3/2017
From To
(usft) (usft) Survey (Wellbore) Tool Name Description
211.85 11,463.171: MWD - Standard (B-36) MWD MWD -Standard
11,463.17 14,171.93 B -36A WP07 Plus 500ft MID (B -36A) MWD MWD -Standard
Summary
Site Name
Offset Well - Wellbore - Design
PS B Pad
B-27 - B -27C - B -27C
8-36 - B-36 - B-36
B-36 - B -36A- B -36A WP07
PB DS 07
Reference Offset Centre to
Measured Measured Centre
Depth Depth Distance
(usft) (usft) (usft)
11,617.88 12,475.00 100.83
11,770.37 11,775.00 70.40
13,671.93 13,671.93 0.00
532017 4:25:56PM Page 2 of 7 COMPASS 5000.1 Build 81B
ZOO,, h BP
b
lt, y Anticollision Report BAKN
'N
HUGHES
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB B Pad
Site Error:
0.00usft
Reference Well:
B-36
Well Error:
0oousft
Reference Wellbore
B -36A
Reference Design:
B -36A WP07 Plus 5001t MD
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 8-36
Mean Sea Level
ORIG KELLY BUSHING @ 76.91usf((DOYON 16)
Tme
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Offset Design
PB B Pad - B-27 - B -27C - B -27C
Survey Program: 100.GYPCT-CM5, 10166 -MWD, J 5 MM
Refuence
OftA
Measumd
VemB l
Measum6
Verecal
W.tVlelllrorecemle
lantle to
Depth
Depth
DWeh
mptn
411.8
eEl-W
csmn,
lusfq
(uefq
(uel)
(uen)
(mnl
hist)
(uafq
11.40157
8,837.58
12,275.00
8.787.37
1,251.09
6,320.96
165.77
11,52117
8,849.77
12,300.09
876829
1,251.14
6,35403
14874
11,54559
6,85038
1232500
8,709.05
1,251.95
6,37892
13373
11,561.17
8.85838
12,35800
8,75945
1,253.38
6,403.87
118,%
11,574.67
8,884.12
12.375.00
8,789.33
1,25561
6,428.77
107.02
11,587.04
884/.99
12497.00
8,788.62
1.2 62
6.453.58
98.97
11,59866
8.872.06
12.425.00
8.78862
1,262.14
647833
95.17
11,609.13
8.87608
12,450.07
8,788.70
1,26525
6.50321
95.78
11.61TU
8,079.70
12,47500
8,789.21
1,267.20
6,52885
10083
11,62500
8852.84
12,50000
6,759.85
1,25792
8,553.03
110.17
1183171
8,955.95
12,52500
8,789.70
1,26728
6,578.02
123.38
11,536.98
8855.50
12,550.00
8,7M67
1,2&537
81502.95
1$931
11.64137
8,890.69
12.575.00
8]09.29
1.262.53
6.6278
157.47
11.61484
8,89247
12.600.00
8]88.53
1,250.59
6,852.45
177.20
11,6:470
8,895.18
12,625.00
8,787,59
1,25349
6,676.91
19799
573/2017 425: 58PM Page 3 of 7 COMPASS 5000.1 Build 81B
►b*BP
Q_',by Anticollision Report
Company:
North America- ALASKA - BP
Local Co-ordinate Reference:
Project:
Prudhoe Bay
TVD Reference:
Reference Site:
PB B Pad
MD Reference:
Site Error:
O.00usft
North Reference
Reference Well:
B-36
Survey Calculation Method:
Well Error:
O.00usft
Output errors are at
Reference Wellbore
B -36A
Database:
Reference Design:
B -36A WP07 Plus 5001t MD
Offset TVD Reference:
Offset Design
PB B Pad - B-36 - B-36 - B-36
Survey Program:
212
-MWD
Reference
onset
Measured
Vertical
Measured
vertical
OReet Wellbore Ce.
care.W
Depth
Depth
Depth
Depth
aN14
.V -W
Cente
luso)
mate
hctm
(uefu
lueft)
lean)
fuss)
11475.00
8,83445
11.47500
BBM.45
1,122.60
SAM 66
0.00
11,500.00
8,843.24
11,50000
8.843.24
1.139.64
8.430.70
0.00
11152500
SAW 85
11,525.00
8.850.85
1,158.28
645350
000
111550.M
0,857a
111550.00
885748
1,178.19
6,467.07
0.00
11,574913
8,064.20
11.575.00
8,08334
1,199.09
6.479.48
1.02
11,59953
8.8]23]
11.80000
8,86823
1,220.87
6,491.11
4.%
11.623.15
8,88201
1L625.00
8,812.58
1,24227
6.50282
1055
11.645.42
8892.77
11,650.00
8.876.58
1.MS5
6,51408
19.02
11,656.13
8,904.19
11,67500
888039
1,285.45
6,529.00
2962
11.68943
8,917.81
117W.00
0,883.90
1,307.14
853B81
41.38
11,71543
8,93134
11,72500
8.886.87
1,329.03
6,550.51
52.11
11,742.51
8,944.59
11,750.00
8.889.15
1.351.15
8,55183
6185
11770.37
0,955.91
11.775.00
8,891.10
1,373]6
6.57325
7040
11,798.56
8,965.25
11.80.00
8,892.99
1,39560
8,504.51
7775
11.826.38
8,93230
11.82500
8094.86
1,417.91
6,59563
84.21
11.853.18
8,976.87
11,85o0f)
8,096.85
1,440.30
ea08.56
90.15
11.878.57
8,979.43
11,875.00
8898.94
1,462.86
6,61758
9604
11,903.17
8,979.95
11,900.00
8900.99
1,48500
882060
10252
11,93o,11
8,978.02
11,925W
8902.8]
1,507.37
6,638.58
10947
11,952.93
8.97438
11,95000
8,904.62
1.529.83
SAW."
117.04
11,967.16
8,972.22
11.87500
8,90161
1,552.30
6.661.23
126.40
11,981.31
0,970.79
12.00000
8,908.51
1,57415
6.672.05
13757
11,99533
0,970.08
12.025.00
8,91085
1,597.15
6.882.90
15006
12.009.50
8,9n) W
12,050.00
0,91367
1,818.51
6,69365
16362
12,023.36
8,930.00
12.07500
8,916.01
1812.00
6,704.16
17821
12.036.52
8,970.00
12,10000
8.919.99
1.86446
6,71488
193.63
WEA2
MKMS
Well B-36
Mean Sea Level
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
True
Minimum Curvature
1.00 sigma
EDM R5K-Alaska PROD -ANCP7
Offset Datum
5732017 4:25:58PM Page 4 of 7 COMPASS 5000.1 Build 81B
''� bp
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB B Pad
Site Error:
O.Oousft
Reference Well:
B-36
Well Error:
O.00usft
Reference Wellbore
B -36A
Reference Design:
B -36A WP07 Plus 500ft MD
Offset Design
PB B Pad - B-36 - B -36A - B -36A WP07
Survey Program: 212-1MD.
11463MND
12,00000
8,970.00
Retarance
8.970.06
OBset
8,97000
12,42500
8.970.00
Me Sumd
Vertical
Measumd
Vertical
Dasel WallBon eenite
Deyth
Depot
Depth
Depth
ew-a
eV.w
(ush)
lusnl
lusty
luserl
Ipm1
lien)
11.475.00
8.83445
11,075.00
8,83145
1,122.60
6.42 66
11,50000
8,84324
11,500.00
8,84324
1139.64
6,430.70
111525M
8,850.85
11,52500
8.850.85
115828
0153.50
11,550.00
8,85]48
11,550.00
8,857,00
1178.19
6,46707
11,57500
Best 22
11,575.00
8,864.22
1,10.65
8,479.76
11,60000
8,072.55
11,80000
8,872.55
1,219.17
6.49185
11,62500
8,882.84
11,825.00
8,88284
1,239.51
0.501.58
11,650.00
0895.18
11,6511.00
0,895.18
1,259.19
6,510.79
11,675.00
8,90940
11,675.00
8,90046
1,278.01
6.518.97
11,70000
8,92365
11]00.00
8923.65
1.296.48
0528.00
11,725.00
8.93648
11,7MeD
8.936.48
1,314.89
6,53901
11,750.00
8,90.83
11,750.00
s%17.83
1.333.06
055188
11,775.W
8,957.59
11,775.00
8,957.59
1,350.82
6.508.50
11,800.00
8,965.67
11.800.00
8,985.67
1,30,01
6.582]4
11.825.00
8,972.01
11,82500
snTel
1,38447
6.60045
11.85000
8,97653
11,85000
8,976.53
1,400.05
6.619.46
11,875.00
097920
11,075.00
8,97820
1,41460
6.639.69
11,900.00
0,97999
11,900.00
8,97999
1428.00
686067
11,92500
8,970.63
11,92500
8,97863
144085
6882.18
11,95000
8,974.92
11950.06
8,974.92
1452.81
6)03.70
11,97500
8,971.34
11.97500
8,971.31
1,464.42
0]25.53
12,000.00
8,970.01
12,000.00
8,97001
1.0542
8.747,94
12,025.00
8 7eW
12.025.00
8,97000
1.48551
6,770.81
12,050.00
8,97000
12,050.00
0,970,00
1,491.39
6,794.17
12.075.00
8,970.00
12.07500
8,970.00
1,502.04
6,817.97
12.100.00
8.970.00
12,100.00
8970.00
1,50543
6,862.14
12.12500
8,90.00
12,12500
8,90.06
1,513.55
086660
12,150.00
8,970.00
12,15000
8.97000
151738
0891.31
12,17500
0,970.00
12175.00
8,970.00
1,520.25
6,916.14
12,200.00
8,970.00
12200.00
8,970.00
1,524.11
6.940.81
12.22500
8,970.06
12.225.00
8,9n1,00
1,529.25
6.965.30
12,250.00
997000
12.250.00
8,97006
1,535.67
6,909.46
12,275.00
0,970.00
12,27500
slincD
1,543.34
7,013.25
12,300.00
8.97000
12,300.00
8,97000
1,552.25
7,026.61
12,325.00
8,97000
12,325.00
8,970.00
1,582.37
7,059.48
12.30.00
8.970.00
12,350.00
0970.00
157367
708176
12.37500
8870.00
12,375.00
3.9M.W
12,00000
8,970.00
12,40000
8.970.06
12025.00
8,97000
12,42500
8.970.00
12050.00
0,970.0
12,450.00
8,970.00
12,0500
0,9700
12.475.0
0,9M.00
12,500.06
8,97000
12.500.00
8,97006
1252500
8,97000
12,525.00
097000
12,550.00
89nee
12,550.00
8,970.00
12,57500
8,970.00
12,575.00
8.970.00
12,000.00
897000
12,600.00
8,97000
12825.00
8970.00
12,625.00
8970.00
12.65006
8.970.00
12,65000
8.970.W
1588.12 7,1044
1.598.69 7,12443
1,614.34 71N69
1,630.03 7,164.15
1.616.71 7,182]6
BP FIN Fla
Anticollision Report BAKM
Muds
Local Co-ordinate Reference:
Well B-36
TVD Reference:
Mean Sea Level
MD Reference:
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
North Reference:
True
Survey Calculation Method
Minimum Curvature
Output errors are at
1.00 sigma
Database:
EDM R5K - Alaska PROD - ANCP1
Offset TVD Reference:
Offset Datum
C .to
czmrc
lusel
000
000
0.00
0.00
000
000
000
0.00
0.00
0,00
0.00
000
0,00
0.00
0.00
0.00
0,00
0.00
000
0.00
0.00
0 00
010
0.00
0.00
0.00
000
0.00
000
0.00
0.00
0Do
oeo
0.00
0.00
0.00
oW
0.00
0.00
000
000
1.661.3
7,200 47
000
188289
7,217.20
0.00
1,70228
7,233.02
0.00
1,74,47
7,207,75
0.00
1703.41
7.26141
0.00
1,765.03
727396
000
1,78727
7,285.39
0.00
57372017 4:25:58PM Page 5 of 7 COMPASS 5000.1 Build 81B
2' BP
b
p Anticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Project:
Prudhoe Bay
TVD Reference:
Reference Site:
PB B Pad
MD Reference:
Site Error:
O.00usft
North Reference:
Reference Well:
B-36
Survey Calculation Method:
Well Error:
O.00usft
Output errors are at
Reference Wellbore
B -36A
Database:
Reference Design:
B -36A WP07 Plus 500ft MD
Offset ND Reference:
Offset Design
PB B Pad - B-36 - B -36A - B -36A WP07
Survey 9rogmm:
212-MWO,
11153-03970
Rater...
Onset
Measutetl
Vertical
Measured
Varaul
Onset Wellbore Centre
Centhto
NWh
Oepm
Depth
Depth
♦WS
tvm
Caet,e
lush
Neftl
Neftl
Issm
luslry
Iusm
lusftl
12,67500
8,970.00
12.675.00
8,9MOO
1,810.09
7,295.57
0.00
12.70000
8,9MW
12,700.00
8,97000
11833.40
7,301.60
0.00
12,T25.W
8,970.00
12,725.00
8,97000
1,858.81
7,31387
0.00
12.750.0)
8,970.00
12,750.00
8.970.03
1,M31
7,324.35
0.0)
12975.00
8,970.00
12,77500
8.9]0.00
1.901A2
7,338.00
O.M
12,900.00
8,97000
12,BM.W
8,970.00
1,922.90
7,348.80
000
12.8250)
0970.0)
12,825W
8,970.00
1,943.67
7,38270
000
12,89700
8.970.00
12.850.00
8,970.00
1,96869
7,377.66
097
12,87500
8,970.00
12.875.W
8,97000
1,902.90
7.393.66
0.00
12.90000
8,970W
12,900.00
8.97000
2,001.25
7,410.64
0.0)
12,625.00
09ID.W
12,925.00
5.970.W
2,01880
7.428.55
0.00
12.950.0)
8,970.00
12,950.M
8,97097
2,035.15
7,"7 36
0.03
12,975.03
8,970.00
12,975.00
8.970.W
2.050.62
7,187.00
0.0
13.0)0=
8,97000
13,03000
8.90.00
2.055.03
7,487.42
OM
13,025.00
8,970.00
13,035.00
8,970.00
2,078.38
7,50057
0.00
13,050.W
8,%9.99
13,050.00
8,96999
2,090.57
7.53039
0.00
13.075W
8.969.20
13,075.00
8,989.20
2,1M.19
7.552.50
OW
13,10000
8,987.13
13,10003
8,987.13
2,11358
7,574.65
0.00
13.12500
8,963.78
13,12500
8.98878
2,124.70
7,59639
0.00
13,150.W
8,959.15
13,15000
8.959.15
2,135.53
7,61894
0.00
13.175.00
8.953.27
13,17500
0,95827
2,146.M
7,84075
0M
13,XoW
8.918.14
13,200W
8.916.14
2,158.16
7,552.46
am
13,22500
8.937,86
13,22500
8.937.86
2.165.87
7,883.95
000
13,250.00
8,929.31
13,250.00
8,94431
2.17053
7.705.77
0.00
13,275W
8.SM75
13,27500
892075
2,182.01
7.728.05
000
13,300.03
8,91220
13,30).M
891220
2,18822
7,750.70
0.0)
13,32500
8,90885
13.325W
8,997.65
2,19.15
7,773.67
000
13,35000
8,8910
13,350.00
8,895.10
2,19819
7)96.87
0.00
13.375.00
0008.51
13,375.00
8,896.54
2,199.14
7,82024
0.00
13,40).W
08899
13,100.00
8,877.9
2.297.18
7,843]1
0.00
13,125.W
8,86914
13.42597
0099.44
2,199.92
7,867.20
OW
13,45000
8,860.89
13.45000
8,85189
2.1994
7,890.63
0.00
13,475.00
8,852.33
13.475.00
8,852.33
2.195.04
7,913.%
0.00
13,500.00
0643.78
13.500.W
8,84370
2,194.38
7,937.43
OW
13,52500
8.035.23
13,525.00
8,83523
2,194.19
7,960.92
0.0)
13,5WW
0,828.88
13.WO.W
8,821.88
2,1932
7,904.38
OM
13,57500
8.818.12
13,575.00
8,81812
2,19776
a=774
0.00
13,60000
8,8M.57
13,W0.00
8,809.57
2,201.50
8,030.93
0.00
13,82597
0801.02
13,625=
8.80102
2,206.52
8,053.88
0.0)
13.850.W
8,792.47
13,650M
8]92.47
2.212.82
8,075.51
OW
13.671.93
0.784.97
13,67193
8]81.97
2.21937
8.0904
000
BAKM Fig
HUGRES
Well B-36
Mean Sea Level
ORIG KELLY BUSHING @ 76.91usft (DOYON 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
5372517 4:25..56PM Page 6 of 7 COMPASS 5000.1 Build 618
BP I/R\
by Anticollision Report BAM
HUGH
Company:
North Amenca- ALASKA -BP
Project:
Prudhoe Bay
Reference Site:
PB B Pad
Site Error:
0.00usft
Reference Well:
8-36
Well Error:
(loousft
Reference Wellbore
B -36A
Reference Design:
B -36A WP07 Plus 50011 MD
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Well B-36
Mean Sea Level
ORIG KELLY BUSHING @ 76.91 usft (DOYON 16)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to ORIG KELLY BUSHING @ 76.91 usft Coordinates are relative to: B-36
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-U,, AK
Central Meridian is 1501 0' 0.000 W - Grid Convergence at Surface is 1.25°
&3/2017 4:25:58PM Page 7 of 7 COMPASS 5000.1 Build BIB
Well Blank 'DR2-AC BOP Schematic 'late
Quick Test Sub to Otis
Top of 7" Otis O.Oft—.—.—.—.—.—._ _.
—CDR] Rig's Drip Pan
Distances from top of riser
Excluding quick -test sub
Top of Annular 0.0 ft 7-1/16" 6k Flange X 7" Otis Boz
O Hydril 71/16" 0
Top Annular Element 0.7ft Annular
Bottom Annular 2ft
CL Blind/Shears 3.3 tt
CL 2-3/8" Combi's 4.1 ft ~
Bs
Deployment
CL 3" PipelSlips 6.6 ft
CL 2-3/8"x3-112" VBRs 7.4 ft
B1
Kill Line
CL Blind/Shears
CL 2-318" Combi's
CL of Top Swab
CL of Bottom Swab
CL Flow Tee
CL of SSV
CL of Master Valve
LDS
Gound Level
0
1o.on
10.7 ft �
13.3 ft
F� Swab 2
1d.8 ft
4/ Swab 1
Ae T1
16.2 ft
BOP2
77.5 ft
Master 2
}
Fusable
19.0 ft BON
Master 1
T2
Test Pump Hose
TRANSMITTAL LETTER CHECKLIST
WELL NAME:
/ PTD: D72
(/ Development _ Service Exploratory Stratigraphic Test —Non -Conventional
FIELD: l�Cl POOL: 7G� �- 6) I
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. API No. 50 -
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50-
__
_-_ J from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company -Name Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Comfy Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(dx2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 davs; after com letion, sus ension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150
KA
PTD#� 2170730 Company BP EXPLORATION (ALASINC. _ Initial Class/Type
Well Name: PRUDHOE BAY- NIT B36A Program DEV Well bore seg ❑
DEV / PEND_ GeoArea 899 Unit 11 On/Off Shore On Annular Disposal ❑
Administration
17
Nonconven, gas conforms to AS31,05.0300.1.A),(j.2.A-D) _ _ _
NA
1
Permit fee attached _
NA
2
Lease number appropriate_ _ _ - _
Yes
Surf Loc &.Top Prod Int lie in ADL0028310; TD lies in ADL0028309.
3
Unique well name and number _ . _ _
Yes
4
Well located in a defined pool _ _ _
Yes
PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341 F
5
Well located proper distance from drilling unit boundary.
Yes
CO 341 F, Rule 2: There shall be no restrictions as to well spacing. except that. no pay shall be _
6
Well located proper distance from other wells. _
Yes
opened in a well closer than 500 feet to the boundary of the affected. area. Planned well conforms to CO _
7
Sufficient acreage available in. drilling unit
Yes
341F, Rule 2.
8
If deviated, is wellbore plat. included
Yes
9
Operator only affected party
Yes
_
10
Operator has appropriate bond in force
Yes
Appr Date
11
Permit can be issued without conservation order
Yes
12
Permit can be issued without administrative approval
Yes
SFD 5!8/2017
13
Can permit be approved before 15 -day wait
Yes
14
Well located within area and strata authorized by Injection Order# (put 10# in. comments) (For
NA
15
All wells within 1/4. mile area of review identified (For service well only)
NA
16
Pre -produced injector: duration of pre -production less than 3 months (For service well only)
NA
18
Conductor string_ provided
NA
Conductor set. in PBU B-36
Engineering
19
Surface casing protects all known USDWs
NA
Surface casing set in PBU B-36
20
CMT vol adequate to circulate on conductor & surf csg
NA
Surface casing set and fully cemented
21
CMT vol adequate to tie-in long string to surf csg.
NA
22
CMT will cover all known_ productive horizons.
Yes
Productive. interval will be completed with cemented production liner
23
Casing designs adequate for C, T, B & permafrost
Yes
24
Adequate tankage or reserve pit
Yes
Rig has steel tanks; all waste to approved disposal wells
25
If a_ re -drill, has a 10-403 for abandonment been approved
Yes
PTD 196-065, Sundry 317-184
26
Adequate wellbore separation proposed
Yes
Anti -collision anslysis complete; no major risk failures
27
If diverter required, does it meet regulations
NA
Appr Date
28
Drilling Fluid program schematic .& equip list adequate
Yes
Max formation pressure is 3318 psig(7.1 ppg EMW ); will drill w/ 8.4-9.5 ppg EMW; MPD utilized
VTL 5/31/2017
29
SOPEs, do they meet regulation
Yes
30
BOPE press rating appropriate; test to (put psig in comments).
Yes
MPSP is 2421 psig; will test BOPS. to 3500 psig
31
Choke manifold complies w/API. RP -53 (May 84)
Yes
32
Work will occur without operation shutdown
Yes
33
Is presence of H2S gas probable
Yes
H2S measures required
34
Mechanical condition of wells within AOR verified (For. service well only)
NA
35
Permit can be issued w/o hydrogen sulfide measures
No
B -Pad wells are. H2S-bearing. H2S measures. are required.
Geology
36
Data presented on potential overpressure zones
Yes
Planned drilling mud program (about 8.4 — 9.5 ppg) appears adequate to control operator's forecast
Appr Date
37
Seismic analysis of shallow gas. zones
NA
pore pressure. gradient (about 7.1 ppg). Should higher pore pressures be encountered,
SFD 5/8/2017
38
Seabed condition survey (if off -shore)
NA
BP has immediate access to nearby Fluid mixing facilities.
39
Contact name/phone for weekly progress reports. [exploratory only)
NA
Geologic Engineering Public
Commissioner: Date: Commissioner: Date CommisDate