Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout217-0737. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU B-36A OA Squeeze Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 217-073 50-029-22667-01-00 341J ADL 0028309, 0028310 13702 Conductor Surface Intermediate Liner Liner 8853 78 3613 10790 936 2804 11465 20" 9-5/8" 7" 4/1/2" 3-1/2" x 3-1/4" x 2-7/8" 8905 36 - 114 36 - 3649 33 - 10823 10614 - 11550 10898 - 13702 2430 36 - 114 36 - 3339 33 - 8606 8452 - 8932 8658 - 8853 None 470 3090 7020 / 5410 7500 10530 11465, 11950, 12800, 13530 1490 5750 8160 / 7240 8430 10160 10976 - 13573 4-1/2" 12.6# 13cr80, L80 31 - 106208704 - 8903 Structural 4-1/2" Baker S3 Packer 4-1/2" Baker S3 Packer 10383, 8282 10564, 8415 Date: Torin Roschinger Operations Manager Oliver Sternicki oliver.sternicki@hilcorp.com (907) 564 4891 PRUDHOE BAY 10/15/2024 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov No SSSV Installed By Grace Christianson at 1:55 pm, Sep 30, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.09.30 13:39:08 - 08'00' Torin Roschinger (4662) 324-567 10-404 DSR-10/2/24MGR03OCT24SFD 10/4/2024JLC 10/4/2024 Gregory Wilson Digitally signed by Gregory Wilson Date: 2024.10.07 13:52:36 -08'00' 10/07/24 RBDMS JSB 100824 OA WellLock Squeeze Well: B-36 PTD: 217-073 Well Name:B-36A Permit to Drill Number:217-073 Well Type P API Number:50-029-22667-01 Job Scope:OA WellLock Squeeze Reg.Approval Req’d?Yes Current Status:Under Eval, Online Date Reg. Approval Rec’vd: Estimated Start Date:10/15/2024 Estimated Duration:2day Regulatory Contact:Abbie Barker (907)564-4915 First Call Engineer:Oliver Sternicki (907) 564 4891 Second Call Engineer:Michael Hibbert (907)903-5990 Brief Well Summary: B-36 is a natural flow producer. On 9/23/24 the OA began to rapidly repressurize and exceed MOASP. The OA of B-36 was cemented to surface on 9/13/08 as part of a RWO to repair a SC leak. Since the OA was cemented, it has seen periods of OA repressurization. Due to this, the OA was Wellocked on 10/11/2019 and again on 9/19/2021. Current Status: B-36 is currently under evaluation starting 09/23/2024. Scope of Work: Squeeze OA with Well Lock (or similar) to repair OA repressurization. Procedure: 1 Valve Shop ND OA GATE VALVE, NU OA INTEGRAL 2 DHD WELL LOCK OA SQUEEZE 3 Special Projects A/DHD WELL LOCK SQUEEZE 4 DHD POP U/E, MONITOR FOR OA REPRESSURIZATION, 5 Valve Shop ND OA INTEGRAL, NU OA GATE VALVE 6 DHD RE-SQUEEZE OA WITH WELL LOCK IF NECESSARY. OA WellLock Squeeze Well: B-36 PTD: 217-073 Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: September 30, 2024Subject: Changes to Approved Sundry Procedure for Well B-36ASundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-36A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 217-073 50-029-22667-01-00 13702 Conductor Surface Intermediate Liner Liner 8853 78 3613 10790 936 2804 11465 20" 9-5/8" 7" 4/1/2" 3-1/2" x 3-1/4" x 2-7/8" 8905 36 - 114 36 - 3649 33 - 10823 10614 - 11550 10898 - 13702 36 - 114 36 - 3339 33 - 8606 8452 - 8932 8658 - 8853 None 470 3090 7020 / 5410 7500 10530 11465, 11950, 12800, 13530 1490 5750 8160 / 7240 8430 10160 10976 - 13573 4-1/2" 12.6# 13cr80, L80 31 - 10620 8704 - 8903 Structural 4-1/2" Baker S3 Packer 10383, 8282 10383, 10564 8282, 8415 Torin Roschinger Operations Manager Michael Hibbert michael.hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028309, 0028310 31 - 8456 N/A N/A 138 1431 13394 41462 43 0 600 1250 205 863 N/A 13b. Pools active after work:PRUDHOE OIL 4-1/2" Baker S3 Packer 10564, 8415 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations No SSSV Installed By Grace Christianson at 1:25 pm, Apr 09, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2024.04.09 12:54:05 -08'00' Torin Roschinger (4662) DSR-4/12/24 RBDMS JSB 041024 WCB 2024-07-09 ACTIVITY DATE SUMMARY 2/26/2024 *** WELL FLOWING ON ARRIVAL *** RIH W/ 30'X 2.29" DMY GUN DEVIATE OUT @ 11060'SLM, POOH RIH W/ 20'X 2.29" DMY GUNS, tag @ 10854'SLM, WORK TOOLS FOR 20MINS WONT FALL THROUGH, POOH. *CONTINUE ON 2-27-2024* 2/27/2024 *CONTINUED FROM 2-26-2024* *** WELL FLOWING ON ARRIVAL*** RIH W/ 20' X 2.29 DMY GUNS SIT DOWN @ 11083'SLM, WORK TOOLS TO 11,130'SLM, POOH. RIH W/ 10' X R-STEM, OJ, LSS, 10' X DMY GUN DRIFT (2.99") DEVIATE OUT @ 11,563'SLM POOH ** WELL FLOWING ON DEPARTURE *** 3/30/2024 *** WELL S/I ON ARRIVAL*** OBJECTIVE: SET NS 325-228 EXTRA RANGE CIBP AND PERFORATE INTERVAL W/2'' GEO RAZOR GUN 6 spf 60 DEG PHASE MIRU YELLOW JACKET E-LINE. PT PCE 250 PSI LOW./3500 PSI HIGH RIH W/CH/1.69'' GUN GAMMA/20' OF 2'' GEO RAZOR GUN, 1.69'' MSST SETTING TOOL AND NS 325-228 EXTRA RANGE CIBP TO SET PLUG AT 11595' 325-228 EXTRA RANGE CIBP AT 11465' MD CCL TO MID ELEMENT 39' CCL STOP DEPTH 11426', AND PERFORATE INTERVAL 10976'-10996' MD W/2'' GEO RAZOR 6spf 60 DEG PHASE TOOL TAG AT 11518' GR-CCL TO BAKER RPM DATED 05-JULY-2017 RDMO YELLOW JACKET ELINE ***WELL S/I ON DEPARTURE *** Daily Report of Well Operations PBU B-36A CIBP and adperfs are correctly shown on the new WBS, below. -WCB PERFORATE INTERVAL 10976'-10996' MD RIH W/CH/1.69'' GUN GAMMA/20' OF 2'' GEO RAZOR GUN, 1.69'' MSST SETTING TOOL AND NS 325-228 EXTRA RANGE CIBP TO SET PLUG AT 11595' EXTRA RANGE CIBP AT 11465' MD 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-36A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 217-073 50-029-22667-01-00 13702 Conductor Surface Intermediate Production Liner 8853 78 3613 10790 936 2804 11950 20" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 9053 36 - 114 36 - 3649 33 - 10823 10614 - 11550 10898 - 13702 36 - 114 36 - 3339 33 - 8606 8452 - 8932 8658 - 8853 None 470 3090 7020 / 5410 7500 10530 11950, 12800, 13530 1490 5750 8160 / 7240 8430 10160 11830 - 13573 4-1/2" 12.6# 13cr80, L-80 31 -10620 9046 - 8903 Structural 4-1/2" Baker S3 Packer 10383, 8282 10383, 10564 8282, 8415 Torin Roschinger Operations Manager Michael Hibbert michael.hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028309, 0028310 31 - 8456 N/A N/A 169 303 21946 4822 160 331 1200 1200 874 172 13b. Pools active after work:PRUDHOE OIL 4-1/2" Baker S3 Packer 10564, 8415 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 2:06 pm, Aug 21, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.08.21 13:46:00 -08'00' Torin Roschinger (4662) DSR-8/21/23 RBDMS JSB 082423 WCB 3-12-2024 ACTIVITY DATE SUMMARY 8/9/2023 ***WELL S/I ON ARRIVAL***(pre-eline) T-BIRD LOADS/KILLS WELL W/ 180 BBLS CRUDE DRIFT W/ 24' x 2.26" DMY PERF GUNS (2.26 od), 1.75" SAMPLE BAILER TO 12,100' SLM (see log, pump assistance past 11,855' slm) ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED*** 8/9/2023 T/I/O= 1900/1900/0 Temp=SI (TFS Unit 4 Assist SL with perforating) Pumped 207 BBLS of crude down TBG to assist SL with reaching Target Depth. SL in control of well upon TFS Departure. Final WHPS= 468/1467/0 8/13/2023 T/I/O= 530/1351/0 Temp= S/I (TFS Unit 4 Assist E-line with pump down) Pumped 118 BBLS of crude in attempt to get E-line to target depth. Well left in E-line control upon TFS departure. Final WHPS=635/1237/0 8/13/2023 ***WELL SHUT IN ON ARRIVAL*** Pressure test from 200LP - 3000HP Run #1 : RIH with 1 7/16" Cable Head, 1 11/16" GR/CCL, 2" Perf Gun, Owens Long Stroke, Northern Tubing Plug (Max OD = 2.10, Max Lenth = 42') Correlate to HES Memory CBL dated 21-aug-19 Plug Set Depth= 11,950' , CCL Offset = 38.3' , CCL Stop Depth = 11,911.7' Shooting Depth = 11,850 - 11,830' , CCL Offset = 8.6' , CCL Stop Depth = 11821.4 (2" 6spf 60phase HSC w/ razor charges) Run#2 : RIH with 1 7/16" Cable Head, 1 11/16" GR/CCL, 2" Perf Gun (Max OD = 2.10" , Max Lenth= 38') Make 3 attempts to make it to perforation depth but stall out at 11490', decision made to push rest of interval to Coil ***WELL SHUT IN ON DEPARTURE*** Daily Report of Well Operations PBU B-36A y Plug Set Depth= 11,950' , Shooting Depth = 11,850 - 11,830' g 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name: Authorized Title: Authorized Signature with date: Contact Name: Contact Email: Contact Phone: PBU B-36A OA Squeeze Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 217-073 50-029-22667-01-00 13702 Conductor Surface Intermediate Liner Liner 8853 78 3613 10790 936 2804 12800 20" 9-5/8" 7" 4-1/2" 3-1/2" x 3-3/16" x 2-7/8" 9040 36 - 114 36 - 3649 33 - 10823 10614 - 11550 10898 - 13702 36 - 114 36 - 3339 33 - 8606 8452 - 8932 8658 - 8853 None 470 3090 7020 / 5410 7500 10530 12800, 13530 1490 5750 8160 / 7240 8430 10160 11980 - 13573 4-1/2" 12.6# L-80 31 - 10620 9048 - 8903 Structural 4-1/2" Baker S3 Packer 10383, 8282 10383, 8282 10564, 8415 Stan Golis Sr. Area Operations Manager Oliver Sternicki Oliver.Sternicki@hilcorp.com 907.564.4891 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final 13.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028309 & 0028310 4-1/2" Baker S3 Packer 31 - 10620 10564, 8415 OA at Surface. Pumped 0.5-gallons of WellLock & applied 2500-psi squeeze pressure. 250 205 24471 22250 200 134 300 0 435 855 321-453 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Senior Pet. Engineer: Senior Res. Engineer: Form 10-404 Revised 3/2020 Submit Within 30 days or Operations By Meredith Guhl at 2:14 pm, Oct 01, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.10.01 13:10:25 -08'00' Stan Golis (880) DSR-10/5/25 RBDMS HEW 10/1/2021 MGR15OCT2021 SFD 10/6/2021 ACTIVITY DATE SUMMARY 9/13/2021 T/I/O = 480/0/0.Verified Zero flow on working side OA. Removed working side OA valve. Installed integral w/ Block vlave and cap. FWHP's 480/0/0 OTG. 9/16/2021 T/I/O = 480/0+/0. Temp = 101*. Steam conductor (Pre wellock). No AL. OA is cemented to surface (open bleed to a BT). Steamed the conductor ports for 3.5 hours. Cement top in conductor with some gravel. Conductor flute cement top @ the 10 o'clock position = 11" with cement top trending down to the flute @ the 3:30 position (31"). Steam job complete. SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:45 9/19/2021 T/I/O = 480/0+/0+. Temp = 100°. OA WellLock Squeeze (repair SC leak). No AL. OA cemented & Wellocked to surface. Remove 1502 cap & block valve, re-install 1502 cap. Pumped 0.5 gallons of WellLock and squeeze OA to 2500 psi for 6 hrs. Monitor WH temp & Wellock sample until sample is set up. WH temp between 60° - 90° until sample is set up. Heater installed in well house, man door ajar. Installed 3/4" CNG hose charged w/1500 psi of N2. Final WHPs = 480/0+/1500. SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:00 9/21/2021 T/I/O = 480/0+/1360. Temp = 104°. WHPs (post Wellock). No AL. Heater working properly. Wellock sample set up. SV = C. WV, SSV, MV = O. IA, OA = OTG. 02:00 9/23/2021 T/I/O = 480/0+/1100. Temp = 104°. WHPs (post Wellock). No AL. Heater not working properly, attempted to reset burner & called dispatch to fix. Wellock sample set up. SV = C. WV, SSV, MV = O. IA, OA = OTG. 05:00 9/24/2021 T/I/O = 480/0+/1110. Temp = 104°. WHPs (post Wellock). No AL. Heater working properly. Wellock sample set up. SV = C. WV, SSV, MV = O. IA, OA = OTG. 03:00 Daily Report of Well Operations PBU B-36A From:Regg, James B (CED) To:AOGCC Records (CED sponsored) Subject:FW: OPERABLE: Producer B-36A (PTD #2170730) Well Lock remedied sustained OA casing pressure Date:Wednesday, October 13, 2021 8:09:02 AM Attachments:image001.png Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Wednesday, October 13, 2021 7:38 AM To: Regg, James B (CED) <jim.regg@alaska.gov> Cc: Wallace, Chris D (CED) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: OPERABLE: Producer B-36A (PTD #2170730) Well Lock remedied sustained OA casing pressure Mr. Regg, On 09/19/21 an outer annulus Well Lock down squeeze was performed on Producer B-36A (PTD #2170730). No OA re-pressurization has been observed since the down squeeze, indicating the sustained casing pressure has been remedied. The well is now classified back to OPERABLE. Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity / Compliance andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 From: Alaska NS - PB - Field Well Integrity <PBFieldWellIntegrity@hilcorp.com> Sent: Tuesday, September 7, 2021 9:45 AM To: Regg, James B (CED) <jim.regg@alaska.gov> Cc: chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; John Condio - (C) <John.Condio@hilcorp.com>; Alaska NS - PB - Field Well Integrity <PBFieldWellIntegrity@hilcorp.com> Subject: UNDER EVALUATION: Producer B-36A (PTD #2170730) OA casing pressure above MOASP Mr. Regg, Producer B-36A (PTD #2170730) has a cemented outer annulus and an OA down squeeze with Well Lock was performed in 2019 to remedy rapid OA re-pressurization. On 09/07/21 Operations reported rapid OA re-pressurization that resulted in a MOASP excursion. The outer annulus pressure was reported to be 1,053 psi. The well is classified as UNDER EVALUATION to address the rapid OA re-pressurization. Plan forward: 1. DHD: Open bleed on cemented OA 2. Wellhead: IC pack off test 3. Operations Engineer: Evaluate for Well Lock re-squeeze 4. Well Integrity: Additional diagnostics as needed Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity / Compliance andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considersappropriate. 1 Carlisle, Samantha J (CED) From:Regg, James B (CED) Sent:Monday, September 20, 2021 9:36 AM To:AOGCC Records (CED sponsored) Subject:FW: UPDATE UNDER EVALUATION: Producer B-36A (PTD #2170730) OA casing pressure above MOASP     Jim Regg  Supervisor, Inspections  AOGCC    333 W. 7th Ave, Suite 100  Anchorage, AK 99501  907‐793‐1236    From: Alaska NS ‐ PB ‐ Field Well Integrity <PBFieldWellIntegrity@hilcorp.com>   Sent: Saturday, September 18, 2021 10:50 AM  To: Regg, James B (CED) <jim.regg@alaska.gov>  Cc: Wallace, Chris D (CED) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; John Condio ‐  (C) <John.Condio@hilcorp.com>; Stan Golis <sgolis@hilcorp.com>  Subject: UPDATE UNDER EVALUATION: Producer B‐36A (PTD #2170730) OA casing pressure above MOASP    Mr. Regg,    Producer B‐36A (PTD #2170730) IA & OA pressures have been bled to 0 psi and the well has been scheduled for a  welllock treatment on the OA. The UNDER EVALUATION clock is being reset to 28 days to accommodate the treatment  and an online monitoring period.     Please call with any questions or concerns.     Ryan Holt  Hilcorp Alaska LLC  Field Well Integrity / Compliance  Ryan.Holt@Hilcorp.com  P: (907) 659‐5102  M: (907) 232‐1005    From: Alaska NS ‐ PB ‐ Field Well Integrity <PBFieldWellIntegrity@hilcorp.com>   Sent: Tuesday, September 7, 2021 9:45 AM  To: Regg, James B (CED) <jim.regg@alaska.gov>  Cc: chris.wallace@alaska.gov; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; John Condio ‐ (C)  <John.Condio@hilcorp.com>; Alaska NS ‐ PB ‐ Field Well Integrity <PBFieldWellIntegrity@hilcorp.com>  Subject: UNDER EVALUATION: Producer B‐36A (PTD #2170730) OA casing pressure above MOASP    Mr. Regg,    2 Producer B‐36A (PTD #2170730) has a cemented outer annulus and an OA down squeeze with Well Lock was performed  in 2019 to remedy rapid OA re‐pressurization. On 09/07/21 Operations reported rapid OA re‐pressurization that resulted  in a MOASP excursion. The outer annulus pressure was reported to be 1,053 psi. The well is classified as UNDER  EVALUATION to address the rapid OA re‐pressurization.    Plan forward:  1. DHD: Open bleed on cemented OA  2. Wellhead: IC pack off test  3. Operations Engineer: Evaluate for Well Lock re‐squeeze  4. Well Integrity: Additional diagnostics as needed    Please respond with any questions.    Andy Ogg  Hilcorp Alaska LLC  Field Well Integrity / Compliance  andrew.ogg@hilcorp.com  P: (907) 659‐5102  M: (307)399‐3816       Kaitlyn Barcelona Hilcorp North Slope, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: kaitlyn.barcelona@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: DATE: 10/05/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL PBU B-36A (PTD 217-073) RBT 08/21/2021 Please include current contact information if different from above. eceived By: 10/05/2021 37' (6HW By Abby Bell at 12:15 pm, Oct 05, 2021 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field/Pool(s): Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will planned perforations require a spacing exception?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStrastigraphicExploratory Authorized Name: Authorized Title: Authorized Signature: Date: Contact Name: Contact Email: Contact Phone: COMMISSION USE ONLY Commission Representative: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other: Post Initial Injection MIT Req'd? Spacing Exception Required?Yes Yes No No Subsequent Form Required: Approved By:Date: APPROVED BY THE COMMISSIONCOMMISSIONER PBU B-36A OA Squeeze Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 217-073 50-029-22667-01-00 N/A ADL 0028309 & 0028310 13702 Conductor Surface Intermediate Liner Liner 8853 78 3613 10790 936 2804 12800 20" 9-5/8" 7" 4-1/2" 9040 36 - 114 36 - 3649 33 - 10823 10614 - 11550 10898 - 13702 2430 36 - 114 36 - 3339 33 - 8606 8452 - 8932 8658 - 8853 None 470 3090 7020 / 5410 7500 10530 12800, 13530 1490 5750 8160 / 7240 8430 10160 11980 - 13573 4-1/2" 12.6#L-80 31 - 106209048 - 8903 Structural 4-1/2" Baker S3 Packer 4-1/2" Baker S3 Packer 10383, 8282 10564, 8415 Date: Stan Golis Sr. Area Operations Manager Oliver Sternicki Oliver.Sternicki@hilcorp.com 907.564.4891 PRUDHOE BAY, PRUDHOE OIL 9/21/2021 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval. 3-1/2" x 3-3/16" x 2-7/8" No SSSV Installed No SSSV Installed By Samantha Carlisle at 8:47 am, Sep 08, 2021 321-453 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.09.07 15:56:31 -08'00' Stan Golis (880) 10-404 DLB 09/08/2021 MGR15SEP2021 X DSR-9/8/21  dts 9/15/2021 JLC 9/15/2021 Jeremy Price Digitally signed by Jeremy Price Date: 2021.09.16 10:35:18 -08'00' RBDMS HEW 9/16/2021 OA WellLock Squeeze Well: B-36A PTD: 217-073 API: 50-029-22667-01 Well Name:B-36A Permit to Drill Number:217-073 Well Type P API Number:50-029-22667-01 Job Scope:OA WellLock Squeeze Reg.Approval Req’d?Yes Current Status:Under Eval, Online Date Reg. Approval Rec’vd: Estimated Start Date:09/22/2021 Estimated Duration:2days Regulatory Contact:Mel Rixse First Call Engineer:Oliver Sternicki Second Call Engineer:Wyatt Rivard Brief Well Summary: B-36A is a natural flow producer. On 9/7/21 the OA exceed MOASP. The OA of B-36A was cemented to surface on 9/13/08 as part of a RWO to repair a SC leak. Since the OA was cemented, it has seen periods of OA repressurization. Due to this, the OA was Wellocked on 10/11/2019. Current Status: B-36A is currently under evaluation starting 08/21/2021. Scope of Work: Squeeze OA with Well Lock (or similar) to repair surface casing leak. Procedure: 1 Valve Shop ND OA GATE VALVE, NU OA INTEGRAL 2 DHD STRAP TOC. TOP OA WITH CEMENT AS NEEDED. WELL LOCK OA SQUEEZE 3 Special Projects A/DHD WELL LOCK SQUEEZE 4 DHD POP U/E, MONITOR FOR SC LEAK, 5 Valve Shop ND OA INTEGRAL, NU OA GATE VALVE 6 DHD RE-SQUEEZE OA WITH WELL LOCK IF NECESSARY. -00 DLB OA WellLock Squeeze Well: B-36A PTD: 217-073 API: 50-029-22667-01 From:Regg, James B (CED) To:AOGCC Records (CED sponsored) Subject:FW: UNDER EVALUATION: Producer B-36A (PTD #2170730) OA casing pressure above MOASP Date:Tuesday, September 7, 2021 12:10:08 PM Attachments:image001.png B-36A.pdf Reviewed 9/7/2021 Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: Alaska NS - PB - Field Well Integrity <PBFieldWellIntegrity@hilcorp.com> Sent: Tuesday, September 7, 2021 9:45 AM To: Regg, James B (CED) <jim.regg@alaska.gov> Cc: Wallace, Chris D (CED) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; John Condio - (C) <John.Condio@hilcorp.com>; Alaska NS - PB - Field Well Integrity <PBFieldWellIntegrity@hilcorp.com> Subject: UNDER EVALUATION: Producer B-36A (PTD #2170730) OA casing pressure above MOASP Mr. Regg, Producer B-36A (PTD #2170730) has a cemented outer annulus and an OA down squeeze with Well Lock was performed in 2019 to remedy rapid OA re-pressurization. On 09/07/21 Operations reported rapid OA re-pressurization that resulted in a MOASP excursion. The outer annulus pressure was reported to be 1,053 psi. The well is classified as UNDER EVALUATION to address the rapid OA re-pressurization. Plan forward: 1. DHD: Open bleed on cemented OA 2. Wellhead: IC pack off test 3. Operations Engineer: Evaluate for Well Lock re-squeeze 4. Well Integrity: Additional diagnostics as needed Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity / Compliance andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considersappropriate. Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:217-073 6.50-029-22667-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 13702 12800 9040 10383, 10564 None 12800, 13530 8282, 8415 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 78 20" 36 - 114 36 - 114 1490 470 Surface 3613 9-5/8" 36 - 3649 36 - 3339 5750 3090 Intermediate 10790 7" 33 - 10823 33 - 8606 8160 / 7240 7020 / 5410 Liner 936 4-1/2" 10614 - 11550 8452 - 8932 8430 7500 Perforation Depth: Measured depth: 11980 - 13573 feet True vertical depth:9048 - 8903 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 31 - 10620 31 - 8456 10383 8282Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker S3 Packer Liner 2804 10898 - 13702 8658 - 8853 10160 10530 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 9451810836256 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Wyatt Rivard wrivard@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.777.8547 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon …Plug Perforations 5 Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8853 Sundry Number or N/A if C.O. Exempt: 321-378 4-1/2" Baker S3 Packer 10564 8415 Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Extended Perf w CTU Operations shutdown … Change Approved Program 5 N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend …Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028310 & 0028309 PBU B-36A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations 3-1/2" x 3-3/16" x 2-7/8" 343 20369 535 9091200 1250 No SSSV Installed By Samantha Carlisle at 9:15 am, Sep 07, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.09.04 16:36:51 -08'00' Stan Golis (880) MGR11OCT2021 RBDMS HEW 9/7/2021 DSR-9/7/21 SFD 9/7/2021 ACTIVITY DATE SUMMARY 8/4/2021 **WELL S/I ON ARRIVAL** PULLED PRONG & EQ'D PX @ 10408'MD **WSR CONT ON 8/5/21** 8/5/2021 **WSR CONT'D FROM 8/4/21** PULLED PX PLUG BODY @ 10408'MD **WELL S/I ON DEPARTURE** 8/20/2021 CTU #6 1.75" CT Job oblective: Drift / CBL log / Set CIBP / Ext Adperf MIRU CTU. Begin Weekly BOP test ***Continued on 08/21/21*** 8/21/2021 CTU #6 1.75" CT Job oblective: Drift / CBL log / Set CIBP / Ext Adperf Complete Weekly BOP test. Make up 2.25" JSN drift and RIH. Bullhead 180 bbls of slk 1% kcl w/safelube and WHP coming up rapidly. Bleed IA to prevent gas migration into tubing. Continue to RIH and set down in perfs at 12922 but able to drift clean with only 0.5-1k weight bobbles. Drift to CIBP and tag at 13500' CTMD, pick up and paint white/yellow TD flag at 13450'. POOH. Make up HES RBT cement bond log BHA and RIH. Unable to load well, circulate to ensure liner is liquid packed and log from 13450 to 10550'. Flag pipe at 12700'. Pooh. ***Continued on 08/22/21*** 8/22/2021 CTU #6 1.75" CT Job oblective: Drift / CBL log / Set CIBP / Ext Adperf Receive good data (+31' correction). Town analyzed the data and emailed a revision to the perforation depths, now only 11980'-12200'. Correlate to Baker Hughes RPM Log dated 05-July-2017. Make up 2-7/8" NS CIBP. RIH to flag, correct depth. Set CIBP at 12800' MD. (ME at 12800.42'). PT CIBP to1548 psi. Lost 17 psi in 10 mins. Pooh circulating out any gas. Confirm well killed at surface. Trim Coil. Make up 220' of 2" MaxForce Perf guns, 6 spf. RIH and tie-in to CIBP. Perforate 11980'-12200'. POOH maintaining hole fill. Confirm well killed and surface and lay down perf gun BHA. Freeze protect well w/ 5 bbls 50/50 & 33 bbls of diesel. ***Job Complete*** Daily Report of Well Operations PBU B-36A Operator Name:2. Exploratory Development Service… …5 … Permit to Drill Number:217-073 6.API Number:50-029-22667-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 0028310 & ADL 0028309 Property Designation (Lease Number):10. 8. PBU B-36A 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon …Plug Perforations 5 Fracture Stimulate …Repair Well … Operations shutdown … Op Shutdown GAS … GSTOR…WAG … SPLUG … … Abandoned Oil 5 WINJ … Exploratory …Development 5Stratigraphic……Service WDSPL … 12. Attachments: PRESENT WELL CONDITION SUMMARY 13702 Effective Depth MD: L-80 11. 8/9/2021 Commission Representative: 15. Suspended … Contact Name: Wyatt Rivard Contact Email: Wyatt.Rivard@hilcorp.com Authorized Name: Stan Golis Authorized Title:Operations Manager Authorized Signature: Plug Integrity …BOP Test …Mechanical Integrity Test …Location Clearance … Other: Yes …No …Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: 5OtherAlter Casing Pull Tubing …… Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: No SSSV Installed Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 8853 Effective Depth TVD:Plugs (MD):Junk (MD): ……Other Stimulate Re-enter Susp Well Suspend …… ……Plug for Redrill 55Perforate ……Perforate New Pool 10383 , 10564 8282 , 8415 Date: Liner 2804 3-1/4" x 3-3/16" x 2-7/8" 10898 - 13702 8658 - 8853 10160 10530 Well Status after proposed work: 16. Verbal Approval: … … …Change Approved Program 36 - 3649 36 - 3339 14. Estimated Date for Commencing Operations: BOP Sketch 36 - 114 Structural 8160 / 7240 Proposal Summary 13. Well Class after proposed work: 4-1/2" Baker S-3 12868 - 13573 9038 - 8903 4-1/2" 12.6# 31 - 10620 Production 13530 8918 13530 none 36 - 114 470 9-5/8" 7" Contact Phone:(907) 777-8547 Date: 7-29-21 7020 / 5410 78 149020"Conductor 3090 …GINJ 5 Post Initial Injection MIT Req'd? Yes No … 5 …… … Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Surface 3613 5750 Intermediate 10790 33 - 10823 33 - 8606 936 4-1/2"10614 - 11550 8452 - 8932 8430 7500 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. …No 5Yes Casing Length MD TVD Burst Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic … 2430 Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. CTU Extended Perforating By Meredith Guhl at 2:19 pm, Jul 29, 2021 321-378 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.07.29 12:45:16 -08'00' Stan Golis (880) DLB07/29/2021MGR29JUL2021 DSR-7/29/21 X 10-404  dts 7/30/2021 JLC 7/30/2021 Jeremy Price Digitally signed by Jeremy Price Date: 2021.07.30 11:00:12 -08'00' RBDMS HEW 7/30/2021 Plug and perf B-36A PTD: 217073 Well Name:B-36A CTU Plug & Add Perf API Number: 50-029-22667-01 Current Status:Producing Rig:SL, CTU & Surface Deployed TCP Guns Estimated Start Date:8/9/2021 Estimated Duration 3days Program Date 7/23/2021 Permit to Drill Number:217073 Regulatory Contact:Abbie Barker (907) 564-4915 (O) First Call Engineer:Wyatt Rivard (907) 777-8547 (O) (509) 670-8001 (M) Second Call Engineer:Noel Nocas (907) 564-5278 (O) (907) 229-9532 (M) Expected Rates 531 BOPD, 10 BWPD and 25 mmscfd (30 Day IOR – 180) Current Bottom Hole Pressure:3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP) Maximum Expected BHP:3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP) Max. Anticipated Surface Pressure:2430psi (Based on .1psi/ft gas gradient) Last SI WHP:2300 psi (Taken on 2/15/21) Min ID:2.31” X NIP at 10900’ MD Max Angle:114 deg at 13602’ Reference Log:BHI RPM log dated 7/5/17 Brief Well Summary: B-36A is 2017 natural flow sidetrack with CIBP set at 13530’ MD and 96’ of perfs added in Z2A as of Oct 2020. Latest perforations gas’d out immediately with gas increasing from pre plug/perf rate of 23 MMSCFD to 36 mmscfd. A bond log is needed prior to proceeding with next stage of perforations to confirm isolation from high GOR toe perfs. Objective:Log CBL to confirm isolation between pevious and proposed perfs. Utilize CTU to isolate existing perforations then surface deploy TCP guns with CTU to add new perfs and improve GOR. Sundry Procedure (Approval Required to Proceed): Note: The well will be killed and monitored before making up the extended perfs guns. This is generally done during the drift/logging or plug set run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Slickline 1. MIRU SL unit and pressure test 2. RIH and pull TTP at 10408’ MD 3. RDMO Coil Tubing 4. MIRU Coiled Tubing Unit, spot ancillary equipment and PT. 5. Bullhead ~270 bbls of 8.4 ppg 1% KCl or equivalent down the tubing to the formation to kill well ahead of extended perforations and fluid pack well for logging. a. Wellbore volume = 10800’ X .0152bpf + .0079bpf x 1000’ +.0058 bpf x 1000’= 180 bbls b. Freeze protect tubing as needed. 6. MU Cement Bond Logging tools and RIH. 7. Log CBL up from CIBP at ~13530’ MD to 10,660’ MD stopping at ±12,400’ MD to paint flag. * -00 DLB Plug and perf B-36A PTD: 217073 c. Log Repeat pass from 11,100’ MD to 10,660’ MD 8. POOH and confirm good data. Obtain corrected flag. 9. MU 2-7/8” CIBP and RIH and correct to flag . d. Contact OE Wyatt Rivard 1(509) 670-8001 or Noel Nocas at 1(907) 229-9532 prior to setting plug/perforating for final approval of tie-ins 10. Set plug mid-joint at ±12,800’ MD and test to 1500 psi. POOH. e.Contingency: CIBP target set depth may be moved up hole based on CBL data if poor cement found between 12,800’ and previous CIBP/perfs. 11. MU single 31ft 2” gun, 6 spf, 60 deg phased with deep penetrating charges. f.Contingency: If CBL data showed poor cement between 12626’ and previous CIBP/perfs then skip conventional gun run Steps 11-13 and proceed directly to upper extended add perf Step 14. 12. RIH as conventional gun run (with PCE) and correlate to flag. Gun Run #Perf Top Perf Bottom Perf Length 1 ±12595 ±12626 ±31 Total ±31 Table 1: B-36A Proposed Conventional Ad-Perf Gun Run 13. Perforate interval per Table 1: B-36A Proposed Conventional Ad-Perf Gun Run. POOH. g.Contingency: If CBL data showed poor cement between 12626’ and previous CIBP/perfs then cancel lower moved up hole based on CBL data if poor cement found between 12,800’ and previous CIBP/perfs. h. Note any tubing pressure change in WSR. 14. At surface, prepare for deployment of TCP guns. Assure excess fluids available if needed to keep hole full. 15. Confirm well is dead. Bleed any pressure off to returns tank. Kill well w/8.4 ppg 1% KCl or equivalent as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 16. Pickup safety joint and TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. 17. Break lubricator connection at QTS and begin makeup of TCP guns per Table 2: B-36A Proposed Extended Ad-Perf Gun Run below. Gun Run #Perf Top Perf Bottom Perf Length 2 ±11980 ±12230 ±250 Total ±250 Table 2: B-36A Proposed Extended Ad-Perf Gun Run 18. RIH and correlate to flag. 19. Pickup and perforate intervals per Table 2: B-36A Proposed Extended Ad-Perf Gun Run. POOH. a. Note any tubing pressure change in WSR. 20. POOH. Stop at surface to reconfirm well dead and hole full. 21. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string.Standing orders flow chart included with this sundry request. MU lubricator *See note above regarding kill methods if pressure observed at surface after perforating. Plug and perf B-36A PTD: 217073 22. RDMO CTU. 23. RTP or FP well. Attachments: 1. As-built Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Tie In Log/Perf Sheet Plug and perf B-36A PTD: 217073 Wellbore Schematic Plug and perf B-36A PTD: 217073 Proposed Schematic Plug and perf B-36A PTD: 217073 Coiled Tubing BOPs Plug and perf B-36A PTD: 217073 Equipment Layout Diagram Plug and perf B-36A PTD: 217073 Standing Orders for Open Hole Well Control during Perf Gun Deployment Plug and perf B-36A PTD: 217073 B-36A Tie-In Log Plug and perf B-36A PTD: 217073 Plug and perf B-36A PTD: 217073 Plug and perf B-36A PTD: 217073 Plug and perf B-36A PTD: 217073 Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:217-073 6.50-029-22667-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 13702 13530 8918 10383, 10564 13530 8282, 8415 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 78 20" 36 - 114 36 - 114 1490 470 Surface 3613 9-5/8" 36 - 3649 36 - 3339 5750 3090 Intermediate 10790 7" 33 - 10823 33 - 8606 8160, 7240 7020, 5410 Liner 936 4-1/2" 10614 - 11550 8452 - 8932 8430 7500 Perforation Depth: Measured depth: 12868 - 13573 feet True vertical depth:9038 - 8903 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# L-80 31 - 10620 31 - 8456 10383, 10564 8282, 8415Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker S-3 Liner 2804 10898 - 13702 8658 - 8853 10160 10530 12. Stimulation or cement squeeze summary: Intervals treated (measured): n/a Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 93408239 1935927 0 23565 110 947 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Wyatt Rivard wrivard@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:(907)777-8547 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon …Plug Perforations 5 Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8853 Sundry Number or N/A if C.O. Exempt: n/a No SSSV Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Operations shutdown … Change Approved Program … n/a Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 028309 & 028310 PBU B-36A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations 3-1/2" x 3-3/16" x 2-7/8" By Samantha Carlisle at 9:50 am, Oct 20, 2020 Digitally signed by Stan Golis DN: cn=Stan Golis, ou=Users Date: 2020.10.20 05:37:50 - 08'00' Stan Golis DSR-10/20/2020 SFD 10/20/2020MGR22OCT2020RBDMS HEW 11/13/2020 ACTIVITY DATE SUMMARY 10/11/2020 CT #9 1.75" Coil Tubing - Job Scope = Drift/Log, CIBP, AdPerf MIRU, MU BOT CTC and Reed Memory Gamma/CCL lgging tools and 2.25" drift nozzle. Load the tubing with KCL and Safe lube, RIH. ***Job Continued on 10/12/2020*** 10/12/2020 CT #9 1.75" Coil Tubing - Job Scope = Drift/Log, CIBP, AdPerf RIH wtih BOT CTC and Reed Memory gamma/CCL w/ 2.25" nozzle. Drifted to 13588 ctm. Perfom tie in log. Correlate to BHI LWD GR-MPR 27-June-2017. MU & RIH w/ Northern Solutions CIBP (2.1" OD). Correct depth at Flag. Set CIBP (Middle Element) at 13530'. Pressure test CIBP to 1500psi - pass. POOH. MU and RIH w/ Gun number 1. ***Job Continued on 10/13/2020*** 10/13/2020 CT #9 1.75" Coil Tubing - Job Scope = Drift/Log, CIBP, AdPerf RIH w/ HES Millenium Perf Gun #1. Tag CIBP, correct depth. PUH & Perforate from 12932'-12964' w/ 2.00" Millenium 6spf. POOH. RIH w/ HES Millenium Perf Gun #2. Tag CIBP, correct depth. PUH & Perforate from 12900'-12932' w/ 2.00" Millenium 6spf. POOH. RIH w/ HES Millenium Perf Gun #3. Tag CIBP, correct depth. PUH & Perforate from 12868'-12900' w/ 2.00" Millenium 6spf. RDMO. ***Job Complete*** Daily Report of Well Operations PBU B-36A new perfs STATE OF ALASKA RECej V ALASKA OIL AND GAS CONSERVATION COMMISSION E® REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed NOV (� + Abandon 11Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations ShJltlL2019 ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Cha ngg Approved Program ❑ Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Oth�f�gf�Laos e 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number: 217-073 3. Address: P.O. Box 196812 Anchorage, AK 99519-6612 Stratigraphic ❑ Service❑ 6. API Number 50-029-22667-01-00 7 Property Designation (Lease Number): ADL 028310 & 028309 8. Well Name and Number: PBU B -36A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 13702 feet Plugs measured None feet true vertical 8853 feet Junk measured None feet Effective Depth: measured 13666 feet Packer measured 10383, 10564 feet true vertical 8866 feet Packer true vertical 8282, 8415 feet Casing:. Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 78 20" 36-114 36-114 1490 470 Surface 3613 9-5/8" 36-3649 36-3339 5750 3090 Intermediate 10790 7" 33-10823 33-8606 7240/8160 5410 / 7020 Liner 936 4-1/2" 10614 - 11550 8452-8932 8430 7500 Liner 2804 3-1/2" x 3-1/4" x 2- 10898 - 13702 8658 - 8853 Perforation Depth: Measured depth: 13553 - 13573 feet True vertical depth: 8910-8903 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6#, 13Cr80 / L-80 31 -10620 31 -10620 Packers and SSSV (type, measured and 4-1/2" Baker S-3 Perm Packer 10383 8282 true vertical depth) 4-112" Baker S-3 Perm Packer 10564 8415 12. Stimulation or cement squeeze summary: Intervals treated (measured): OA cemented to surface. Strap OA @ 32.5". Treatment descriptions including volumes used and final pressure: Laid in 5.17 gallons of WeIlLock from bottom up, evacuated an additional 3.0 gallons of fluid & grease (4.5 gallons total) Installed sweeping 90 and 3' stand pipe. Pumped 2.5 gallons of Well-ock (7.5 gallons total) to fill stand pipe and squeeze OA to 2500 psi. Monitor OAP & SH Temp for next 24 hrs. Monitored WHPs and SH Temp post OA Wellock squeeze until Wellock sample is fully cured. Final Pressures: OA = 0 psi, IA = 0 psi, TBG = 740 psi 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 258 23827 6 0 878 Subsequent to operation: Shut In 0 740 14. Attachments: (required per 20 MC 25.070.25.071, s 25.2e0) 15. Well Class after work: Daily Report of Well Operations Z Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319-195 Authorized Name: Lastufka, Joseph N Contact Name: Tempel, Joshua Authorized Title: Specialft Contact Email: Joshua.Tempel@bp.com Authorized Signature: Date: Contact Phone: 1 9078915930 Form 10.404 Revised 04/2077,,e`;' , e RBDMS OV 0 5 2019 Submit Original Only -Daily Report of Well Operations PBU B -36A ACTIVITYnATF el uAu• MW T/I/O = SSV/300/350. Temp = SI. Bleed OAP to 0 psi & strap TOC (pre Wellock). AL disconnected. OA FL @ cemented to surface. Bled OAP from 350 psi to 0 psi in —1 min, gas. Held open bleed for 1 hr for valve shop to C/O casing valve. Strapped OA cement top @ —14". 10/1/2019 Valve shop in control of well upon departure. 11:00 T/I/O=SI/300/350. Pre well lock. RD OA. RU intragal and block valve with 1502 cap. Installed wireless gage on 1502 cap.***JOB COMPLETE***. See log for details. Final WHP's SI/300/0. MV 10/1/2019 open SSV,SV and WV closed. IA and OA open to gage. OA valve is well house. T/I/O = 1860/330/350. Temp = SI. Bleed IAP & OAP to 0 psi (WellLock Squeeze). AL disconnected. Intergal and 2" hardline valve on OA. IA FL @ 6909' (Sta # 3, Dome). OA FL @ cemented to surface. Bled IAP to OT from 330 psi to 0 psi in 2 hrs, all gas. IA FL unchanged. Bled OAP to 0 psi in <1 min, all gas. Held open bleed on OA for 2 hrs. Monitored for 30 min. Heater is still installed and doors are open and tree cap bled to 0 psi. Final WHPs = 1680/0/0. 10/10/2019 SV, WV, SSV = C. MV = O. IA, OA = OTG. 03:15 T/I/O = SSV/0/110. Temp = SI. OA WellLock Squeeze. AL disconnected. OA cemented to surface. Bled OAP from 110 psi to 0 psi in <1 min (all gas). Monitor OAP for 1 hr for no observable flow. Remove 1502 cap & block valve, strap OA @ 32.5" (-3.2 gallons). Evacuate —1.5 gallons of fluid from OA w/ suction pump. Laid in 5.0 gallons of WellLock from bottom up, evacuated an additional 3.0 gallons of fluid & grease (4.5 gallons total). Installed sweeping 90 and 3' stand pipe. Pumped 2.5 gallons of WellLock (7.5 gallons total) to fill stand pipe and squeeze OA to 2500 psi. Monitor OAP & SH Temp for next 24 hrs. 10/11/2019 ***WSR continued on 10/12/19*** ***WSR continued from 10/11/19*** T/I/O = SSV/0/1760. Temp = SI. OA WellLock Squeeze. AL disconnected. OA cemented to surface. Monitored WHPs and SH Temp post OA Wellock squeeze. Bled OAP from 1720 psi to 760 psi post monitor (-1 tablespoon of WellLock, mostly gas). WellLock has consistency of warm honey. 1 door partially open, other door closed. Tag hung. Final WHPs = SSV/0/780, SH Temp = 80*. 10/12/2019 SV, WV, SSV = C. MV = 0. IA, OA = OTG. 12:30 T/I/O = SSV/0/820. Temp = SI. WHPs & WH Temp (Post WellLock). AL disconnected. WH Temp = 89°. OAP decreased 10 psi and WH temp increased 1° in 15 hrs. WellLock sample has consistency of warm honey. Both well house doors and heater vent partially open. 10/13/2019 SV, WV, SSV = C. MV = O. IA, OA = OTG. 15:50 TWO = SSV/0/770. Temp = SI. WHPs & WH Temp (Post WellLock). AL disconnected. WH Temp = 87°. OAP decreased 10 psi and WH Temp increased 11 * in 15.5 hrs. WellLock sample is tacky and has consistency of cold molasses. Both well house doors partially open. 10/14/2019 SV, WV, SSV = C. MV = O. IA, OA = OTG. 12:45 TWO = SSV/0/730. Temp = SI. WHPs & WH Temp (Post WellLock). AL disconnected. WH Temp = 870. OAP decreased 40 psi and WH Temp unchanged in 14 hrs. WellLock sample is tacky and is starting to solidify. Both well house doors partially open. 10/15/2019 SV, WV, SSV = C. MV = 0. IA, OA = OTG. 02:50 T/I/O = SSV/0/650. Temp = SI. WHPs & WH Temp (Post WellLock). AL disconnected. WH Temp = 90°. WellLock sample is no longer tacky but can be indented with fingernail. Both well house doors partially open. 10/16/2019 SV, WV, SSV = C. MV = O. IA, OA = OTG. 03:20. T/I/O = SSV/0/540. Temp = SI. WHPs & WH Temp (Post Wellock). WH Temp = 70°. Wellock sample set up hard. 10/17/2019 SV, WV, SSV = C. MV = 0. IA, OA = OTG. 23:30. TWO = SSV/0/560. Temp = SI. WHPs (Post Wellock). AL spool disconnected. WH temp = 62*. Adjusted heater trunk closer to casing. CNG hose rigged up to OA jewelry being used as an accumulator. 10/18/2019 SV, WV, SSV = C. MV = 0. IA, OA = OTG. 11:10 Daily Report of Well Operations PBU B-36A T/I/O = SSV/0/580. Temp ;'—ST. WHPs & WH Temp. (Post WellLock). AL spool disconnected. WH temp = 86°. Wellock sample set up hard. One wellhouse door open. 10/19/2019 SV, WV, SVV = C. MV = O. IA, OA = OTG. 15:00 TWO = SSV/0/560. Temp = SI. WHPs & WH temp. (Post WeIILo k). AL disconnected. WH temp = 80*. Heater in wellhouse, one door open. Wellock sample set up hard. 10/20/2019 SV, WV, SSV = C. MV = 0. IA, OA = OTG. 09:30 T/l/O = SSV/0/550. Temp = Sl. WHPs & WH temp. (Post Welll-ock). WH temp = 88°. Both man- doors closed with 2nd heater outlet fully open. Wellock sample appears to be fully cured. 10/22/2019 SV, WV, SSV = C. MV = 0. IA, OA = OTG. 23:59. TWO = SSV/0/240. Temp = SI. WHPs (Post Wellock). WH temp = 60*. Adjusted heater trunk. Wellock sample is fully cured. 10/23/2019 SV, WV, SSV = C. MV = 0. IA, OA = OTG. 12:45 T/I/0 = SSV/0/220. Temp = SI. WHPs (Post Wellock). WH temp = 80*. Adjusted heater trunk. Wellock sample is fully cured. 10/24/2019 SV, WV, SSV = C. MV = 0. IA, OA = OTG. 03:30 TWO = SSV/0/220. Temp = SI. WHPs (Post Wellock). WH temp = 58°. Shut wellhouse door. Wellock sample is fully cured. 10/25/2019 SV, WV, SSV = C. MV = O. IA, OA = OTG. 23:59. T/I/O=SI/200/0 Removed Integral flange and jewelry from OA outlet and installed gate valve. 10/26/2019 Torqued to API specs. FWP's SI/200/0 TWO = SSV/O+/O+. Temp = SI. WHPs (Post Wellock). No AL. WHPs unchanged overnight. Wellock sample is set up. Pulled heater. 10/27/2019 SV, WV, SSV = C. MV = 0. IA, OA = OTG. 13:00 WELLHEAD= FMC ACTUATOR = DEV OKB. aR =76.91' LATCH REE ELBI= 76.91' BF. R" = 43.23' KOP= 12W Max Angle =� 114" ! 13602' Datum NO 11396' TJatum TVP= -8$00' SS 91-5#, H -40,D =19.124' 269. L-80 BTG D = 6276" 3244' 40#, L-80 BTC, D = 8.835" 3649' 7" C5G. 26#, L-80 8T6AL D = 6276' -t 9' Minimum ID = 2.31" @ 10900' HES X NIP IN LTP WIPTSA & JFE 4-112' TBG, D = 3-958' 7" CSG, 29#, 13CR NSCC, ID= 6,184- 13- X 3-114" X 2-7/8" TOUT D = 2.992" H 11648' ''2'UNI 12.8#, 73CR NSCT, ^•11550' A152 bpf, ID = 3.953' 6.69, 13CR-85 TCS, .0079 bpf, D = 2.650" 11931' PERFORATION SUIMR9ARY REF LOG: ON ANGLEATTOPPE RP: 111` @ 13553' Note: Refer to Production DB for historical pert data I -EISPFI NI6RVAL OpnISgz I SHOT I SOZ • I 6 1'1551- 11171 If A IMIAW471 LPBTDJ 13666' 13CR•85 STL, .0058 bpf, D= 2.441" 13702' B 36A Lc,AHr4o1! NOTES: WELL ANGLE> 70* @ 11495"" E TBG, CSG& LINER***MAX DLS:262- @ 2086• 4-12" HES X NP, D = 3.813" 7" HES ES C9N J 9-518" X 7- BKR BC PXR GAS I. FT AAA Nf1RR C ST MD TVD DEV TYPE VLV LATCH LT1Rr DOTE 4 3804 3452 43 KGB2 DOAE BK 16 03/16/17 3 6909 5706 42 KGB2 DOA,E BK 16 03!16!17 2 8942 7209 42 KGB2 ow BK 0 09/10/08 1 10266kI961 41 KGB2 DA71' BK 0 09/10/08 10374' ��7" X 4-72" BKR S -S PI(R D = 3.870" 10408' 4-12" FES XNP. D = 3.813" 1062$' 7" X 4-72" UIJOUE OVBZSFDT 10663' 4-112" HES X NP, D = 3.813" 10664' 7' X 4-72" BKR S3 PKR D = 3.875" 10687' 4-12" FES X NP, D = 3.673" 10606" 4-112" FES XN NP IALLED TO 3.80" 10614' 10'TNYTEBACK SLV. D=5.241' X I2'TW DOVE TAIL FIGR, D - 3.915' LTPwD DEFLOY MENT SLV, D= Iusuu" I-)FIE6X NP,D=2.31" 10920" 3-12' X NP, D = 2.613' 11648' 3-12"X3-3/16' XO, D = 2.786' MLLOUT WINDOW (B -36A) 11550'- 11560- 1931' H 33116" X 2-78" XO, D = 2.377" PRUDHOE BAY LW WALL B -36A PEFW W: 217-073 API No: 50-029-22667-01 SEC 31, T71N, R14E 529' FNL & 1894' FFL DATE REV BY COMMENTS DATE REV BY 00MMB4TS 05/22/96 N28E ORIGINAL COMPLETION 06/22/17 JNJJMD ADD®BF & REFELEV OW04106 D76 RWO 07/03117 JMD DRLG HO aww=Ns 09111106 D16 RIND 07/05/17 RdJJ D FMLODEAPPFDVAL 07/01/17 N•CDR2 CTDSIDEfRACK(B•36A) 07/10!17 JC/JMD ADFERF5 (07/06/17) 06/08/17 lMD BUILT PROPOSED 06/30/17 659JAD SET LTPw/PTSA & X NP (06/26117) BP Exploration (Alaska) 0622/17 JTMUMD MLL®XN NP&SET WSw/PPTAG THE STATE °f11. GOVERNOR MIKE DUNLEAVY Katherine O'Connor Integrity and Interventions Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B -36A Permit to Drill Number: 217-073 Sundry Number:319-059 Dear Ms. O'Connor: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aOgcc.olaska.gov The AOGCC denies the enclosed application for sundry approval relating to the above -referenced well. The reason for this denial is the AGOCC will require recent TIO plots, an OA injectivity test, and another MIT -IA (or CMIT TxIA) before placing well lock in the OA in a manner that could mask communication to the OA (surface and/or shoe) from the IA. This denial is without prejudice to your right to resubmit an application in the future if you are able to provide the necessary supporting information. As provided in AS 31.05.080(a), within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal an AOGCC decision to Superior Court unless reconsideration has been requested. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this 2-o dray of February, 2019. RBDMS S49 2 0119 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 CE' VE 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing❑ Change g Approved Program -,p Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other OA WellLock Squeeze 0 2, Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development 0 - 5. Permit to Drill Number 217-073 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigrephic ❑ Service ❑ 6. API Number: 60-029-22667-01-00 7. If perhat Regula What Regulation or Conservation Order governs well spacing in this pool? B. Well Name and Number: Will planned perforations require a spacing exception? Yes ❑ No 0 PBU B -36A 9. Property Designation (Lease Number): 10. Field/Pools: ADL 028310 & 028309 PRUDHOE BAY. PRUDHOE ' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 13702 8853 13668 8866 None None Casing Length Size MD TV Burst Collapse Structural Conductor 78 20" 36-114 36 - 114 1490 470 Surface 3613 9-5/8" 36-3649 38 - 3339 5750 3090 Intermediate 10790 7" 33-10823 33 - 8606 7240/8160 5410/7020 Liner 838 4-1/2" 10614-11 55 8452 - 8932 8430 7500 Liner 2804 3 -1112"x3 -1/4"x2-7/8" 98 - 1 02 8658 - 8853 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing e: Tubing Grade: Tubing MD (ft): 13553 - 13573 8910 - 8903 / 12.6rt 13Cr80 / L-80 31 -10620 Packers and SSSV Type: 4-1/2" Baer S-3 Packer / Packers and SSSV MD (ft) and TVD (11 103831 4412" Baker S-3 Packer I / 105641 12. Attachments: Proposal Summary 0 Wellbore"S to 13. Well Class after Proposed work: Detailed Operations Program ❑ ketc Exploratory ❑ Stratigraphic ❑ Development 0 Service ❑ 14. Estimated Date for Commencing Operations: March 019 15. Well Status after proposed work: Oil 0 WINJ ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Dater GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and th procedure approved herein will not Contact Name: O'connor, Katherine be deviated from without prior written approval. Contact Email: Katherne.O'connor0 p.00m Authorized Name: O'cennor, Katherine Contact Phone: +1 8075644640 Authorized Title: Integrity & Interval4tions Engineer Authorized Signature: Date: ZI l j j 9 COMMISSION USE ONLY alon so that a representative may witness Sundry Number: h `� U(�✓ Conditions of apXired? Plug Integrity Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Post Initial Injects ❑ No [I Spacing Exceptis ❑ No (7 Subsequent Form Required: IC -10L4 APPROVED BYTHE Approved by: COMMISSIONER COMMISSION Date: ORIGINAL RBDMS3ZFEB 2 0 1019 #L" 11 resmr Submit Fo- rm and Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. Attachm is in Duplicate / Z f5 -/j• by la^ k*j Well: B-36 B-36 OA WeIlLock Squeeze Well Interventions Engineer: Katherine O'Connor (907) 564-4640 Pad Engineer: Wade Boman (907) 564-4674 Expected Start Date: March 1, 2019 History B-36 is a naturally producing well. In 2008 a RWO cut & pulled the PC and cemented the OA to repair a surface casing leak. The well was on a on/off production cycle, and the last time the well was "on" (Nove 2018 — Jan 2019) there was rapid OA repressurization. This well was monitored for repressurization trends, and on 2/3/2019 the well was put under evaluation with T/I/O of 2130/290/790 psi. The well passed PPPOT-T and PPPOT-IC tests, indicating the communication is not through the well head. The plan forward is to complete a WeIlLock treatment — squeezing the WeIlLock into the cemented OA to mitigate repressurization. Pending a successful squeeze, the well can be brought back to operable status. Current Status The well is currently under evaluation and will be soon shut-in and classified as "Not Operable" by BP. Objective Squeeze the cemented OA with Well Lock to seal off the OA re -pressurization. Procedure 1. ND OA Gate Valve, NU OA Integral, 2. Bleed Annuli, Prep OA, WeIlLock OA top job squeeze to 2500 psi per RPs. 3. E EV a 78.91' I TVDI MV I TYPE I vLV ELEV - 43.23' 647E 20' GOND, ' 1250' 43 KG62 Angle= 1146 A 13607 16 D- 19 124' =MD= 11396' 5706 42 infiVD-: - --eaov ss BK asm• RG 4W, L-tU RR:, XI=A 835' 1-I 3949• Taco. car. L-tW OTaµo cs; c^ 9770 Minimum ID =2.3, 10900' HES X NIP IN LTP wIPTSA 6 NE BEAR .0152 bpi, D - 3.938' ra-irr TBG. t2.88. L-80, .0toz i,rr, u-p.>tae� - i LNFL 9.39. 13CR#9 STL. 0087 bp/. 11) 92• 111{1• 4-177 LF81, 12.81, 13CR NSCT, 0152 bpi. D = 3.953' it#(X^W IKM 5tRAMANT HLF LOG: ON _f_ f_ AN2.EATTOPPUF 111'01355Y RTL. Bose W, 1)=244V SAFETY NOTES: WELL ANGLE> 701 @ 11415'... CHROME B -36A g $Qaj' ]-j4t2'IfsxPp.D^3.Et3- 43 6 CEAYIB4 Vrxra a-,Rw r,A51 FT VAWIR 1 S ST I UD I TVDI MV I TYPE I vLV I LATCH RTF 647E 4 3804 3452 43 KG62 DOME BK 16 03/16117 3 6909 5706 42 KG92 DOME BK 16 03/18117 2 8942 1 72DD 42 KOW 0647 BK 0 1 091101 100M 881195 41 KGB2 DW BK 0 0011588 -11 1�� 7' % 4-112" BKR 5-3 PKR D a 1.870' r x 412- 1066{• -(r X 4-.I/2• RKR 5-3 MR D = 5-875' 10917' 1-�4-In'r+rSXrv, ma 387 ]•� 10608' H412'MES XN FJP MBL®703.80'0 10914' +o•TNYT8RA0<sLv,o-stat' 1fAIN ,--�4'IIL-YYLtIi. Ua D.`J.70J 10639' �L3AU 1-f LOGC�O6i1G19E... '� 1� T•Y4ttl'TMII TP Az3915 HYDRD HOP, D =1515 - KB RKR LIP w IPFSA. D = 2.44• (0821 '0.13KR OEFLOf MDR SLV. D+3.00' 112^ X NP, D= 2-813- 112• X 1918' XO, D - 2.166' MLLOUT WFWW (B -38A) 11 S50'- I I500' 1 1931' 13n6 X tam- xo. D • z 37r DATE fiV BY OOFR.Bm 64TE FEV BY COPA NM 05MMS 5273E ORKDAL COM PLET10N 0522!17 J JJMD AWED BF 9 H4.' ELEV llw"s 019 FMIO 07103(17 JMD DPLG HD OOF7d*IMNS. owilse DIG )MID 07105117 10aW17 FCIJMD FMLODEARii7VAL 07101117 NCDRZ CTDSN MCK(&36A) 07/10117 J AU AOFERFS(07105117) 06108117 JMD BIILT FF40POSM B13FJJAD SFT UP IPTSA B X NP (0&2&17 0529'17 JIMJUD MLLeDxN NPl SET WS w0P TAG RIDR)E BAY Ulf WELL B -36A PEFUT P* 217-073 AM N0: 50-029.22867.01 STD 31, TI IK RUE 529' FHL 8 1894' FE_ BP BlploraHom (Aba9kal Rixse, Melvin G (DOA) From: Rixse, Melvin G (DOA) Sent: Tuesday, February 19, 2019 3:07 PM To: 'O'Connor, Katherine' Cc: Guy L Schwartz (DOA) (guy.schwartz@alaska.gov) Subject: RE: PTD 217-073, Sundry 319-059 - PBU B -36A Katherine, Sundry request #319-059 is currently denied. AGOCC will require recent TIO plots, an OA injectivity test, and another MIT -IA (or CMIT TxIA) before placing well lock in the OA in a manner that could mask communication to the OA (surface and/or shoe) from the IA. Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-223-3605 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231) or (Melvin.Rixse(&alaska.eov). cc. Guy Schwartz From: O'Connor, Katherine <Katherine.O'connor@bp.com> Sent: Monday, February 11, 2019 11:05 AM To: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov> Subject: RE: PTD 217-073, Sundry 319-059 - PBU B -36A Hi Mel, In March 2017 the well had a passing MIT -T and CMIT-TxIA. The IA is not fluid packed. The fluid level is at the Station 3 Dome valve. Thanks, Katherine O'Connor Interventions & Integrity Engineer Phone: 907-564-4640 Mobile: 214-684-7400 katherine.o'connor@bn.com From: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov> Sent: Monday, February 11, 2019 9:19 AM To: O'Connor, Katherine <Katherine.O'connor@bp.com> Subject: PTD 217-073, Sundry 319-059 - PBU B -36A Katherine, DATA SUBMITTAL COMPLIANCE REPORT 10/5/2017 Permit to Drill 2170730 Well Name/No. PRUDHOE BAY UNIT B -36A MD 13702 TVD 8853 Completion Date 7/6/2017 REQUIRED INFORMATION / Mud Log No DATA INFORMATION Types Electric or Other Logs Run: MWD/GR/RES t P—PK Well Log Information: Log/ Electr Operator BP EXPLORATION (ALASKA) INC. API No. 50-029.22667-01-00 Completion Status/ 1 -OIL Current Status 1 -OIL UIC No Samples No Directional Survey Yes✓ Data Digital Dataset Log Log Run Type Med/Frmt Number Name Scale Media No ED C 28413 Digital Data ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C 28413 Digital Data 28413 Digital Data 28413 Digital Data 28413 Digital Data 28413 Digital Data 28413 Digital Data 28413 Digital Data 28413 Digital Data 28413 Digital Data 28413 Digital Data 28413 Digital Data (data taken from Logs Portion of Master Well Data Maint) Interval OH / Start Stop CH Received Comments 10808 13702 7/25/2017 Electronic Data Set, Filename: B- 36A_LWD FINAL FIELD_COMPOSITE_27JUN2 017_ BHI_CTK.Ias 7/25/2017 Electronic File: 10435175 1-7-20171.pdf , 7/25/2017 Electronic File: 12914857 3-29-2017x.pdf - 7/25/2017 Electronic File: B -36A Pre Run 03 USR 10435175.pdf 7/25/2017 Electronic File: B -36A Pre Run 04 USR 12914857 airhang.pdf 7/25/2017 Electronic File: B- 36A_GR_Res 27JUN2017_MD_FINAL_FIELD_B - HI_CTK.cgm 7/25/2017 Electronic File: B - 36A GR_ Res_ 27JUN2017_TVDSS_FINAL_FIEL - D_BHI_CTK.cgm 7/25/2017 Electronic File: B- p 36A_GR_Res_27JUN2017_MD_FINAL_FIELD_B HI_CTK.pdf 7/25/2017 Electronic File: B - V2 36A_GR_Res_27JUN2017_TVDSS_FINAL_FIEL- D_BHI_CTK.pdf 7/25/2017 Electronic File: B -36A Final Survey Report.pdf. , 7/25/2017 Electronic File: B -36A Final Survey Report.txt . 7/25/2017 Electronic File: B -36A Final Surveys TO 13702.csv AOGCC Page I of 3 Thursday, October 5, 2017 DATA SUBMITTAL COMPLIANCE REPORT 10/5/2017 Permit to Drill 2170730 Well Name/No. PRUDHOE BAY UNIT B -36A MD 13702 ED C ED C ED C ED C ED C TVD 8853 28413 Digital Data 28413 Digital Data 28413 Digital Data 28413 Digital Data 28413 Digital Data Completion Date 7/6/2017 ED C 28413 Digital Data Log C 28413 Log Header Scans ED C 28471 Digital Data ED C 28471 Digital Data ED C 28471 Digital Data ED C 28471 Digital Data ED C 28471 Digital Data ED C 28471 Digital Data Log C 28471 Log Header Scans Well Cores/Samples Information: Name Operator BP EXPLORATION (ALASKA) INC. Completion Status 1 -OIL 0 0 10210 13671 11346 11589 0 0 Interval Start Stop Sent Received API No. 50-029-22667-01-00 Current Status 1 -OIL UIC No 7/25/2017 Electronic File: B -36A Final Surveys TO .. AOGCC Page 2 of 3 Thursday, October 5, 2017 13702.x1sx 7/25/2017 Electronic File: B-36A_25_tapescan_BHI _CTK.txt - 7/25/2017 Electronic File: B-36A_5_tapescan_BHI _CTK.txt- 7/25/2017 Electronic File: B-36A_output.tap 7/25/2017 Electronic File: B- 36A_GR_Res _ 27JUN2017_MD_FINAL_FIELD_B . HI_CTK.tif 7/25/2017 Electronic File: B- 36A_GR_Res _ 27JUN2017_TVDSS_FINAL_FIEL D_BHI_CTK.tif 2170730 PRUDHOE BAY UNIT B -36A LOG HEADERS 8/8/2017 Electronic Data Set, Filename: B- 36A_MRPM_ PNC3D_RAW_PASS0IUP_5JUL20 , 17_BHl.las 8/8/2017 Electronic Data Set, Filename: B - 36A_ MRPM_ PNC3D_RAW_PASS02UP_5JUL20 ' 17 6Hl.las 8/8/2017 Electronic File: B- 36A_MRPM_PNC3D_RAW _5JU L2017_BH I. meta Electronic File: B- p8/8/2017 T 36A_ MRPM_PNC3D_RAW_5JUL2017_BHI.PDF' 8/8/2017 Electronic File: B- 36A_MRPM PNC3D_RAW_PASS0IUP_5JUL20 17 BHI.dlis 8/8/2017 Electronic File: B - 36A_ MM RP_ PNC3D_RAW_PASS02UP_5JUL20 - 17 BHI.dlis 2170730 PRUDHOE BAY UNIT B -36A LOG HEADERS Sample Set Number Comments AOGCC Page 2 of 3 Thursday, October 5, 2017 DATA SUBMITTAL COMPLIANCE REPORT 10/5/2017 Permit to Drill 2170730 Well Name/No. PRUDHOE BAY UNIT B -36A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-22667-01-00 MD 13702 TVD 8853 Completion Date 7/6/2017 Completion Status 1-0I1- Current Status 1 -OIL UIC No INFORMATION RECEIVED Completion Report Directional / Inclination Data YY Mud Logs, Image Files, Digital Data /YY�' l.% Core Chips Y Production Test Informatior®Y NA Mechanical Integrity Test Informatio5Y, Composite Logs, Image, Data Files') Core Photographs Y (j�111 Geologic Markers/TopsJ Daily Operations Summary Cuttings Samples Y Laboratory Analyses Y ! A COMPLIANCE HISTORY Completion Date: 7/6/2017 Release Date: 6/1/2017 Description Date Comments: Compliance Comments Date:/ D [ S /( AOGCC Page 3 of 3 Thursday, October 5, 2017 STATE OF ALASKA j ALASKA OIL AND GAS CONSERVATION COMM, ,ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations Cl Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Reenter Susp Well ❑ Other. Set Liner Top Packer 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development m Exploratory ❑ 5. Permit to Dnll Number: 217-073 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 8. API Number: 50-029-2266701-00 7. Property Designation (Lease Number): ADL 0028310 8. Well Name and Number PBU B -36A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: REC1111M Total Depth: measured 13702 feet Plugs measured feet SEP 2 5 true vertical 8853 feet Junk measured feel 2011 Effective Depth: measured 13888 feet Packer measured See Attaatment feet �q{�/'�)'^'+^_ true vertical 8866 feet Packer true vertical See Attachment feet ^ ""��^ C Casing: Length: Size: MD: ND: Burst: Collapse: Structural Conductor 78 20" 91.5# H40 36-114 36-114 1490 470 Surface 3613 9-5/8" 40# L-80 36-3649 36-3339 5750 3090 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 13553 - 13573 feet True vertical depth: 8910 - 8903 feet feet Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV (type, measured and See Attachment See Attachment See Attachment true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 945 33531 0 1520 986 Subsequent to operation: Shut -In 1280 240 14. Attachments: I.q.,.a per 20 MC 25D70 25,071, a 25.2831 15. Well Class after work: Daily Report of Well Operations R1 Exploratory ❑ Development ® Service ❑ Stmtigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil ® Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ IGSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17, 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or WA if C.O. Exempt: N/A Authorized Name: Boman, Wade Contact Name: Boman, Wade Authorized Title: Production Engineer, B&X pads Contact Email: Wade.BOman@bp.com Authorized Signature: ( �,! A„np� Date: -��_ 2� -� Contact Phone: +1 9075644674 Form 10404 Revised 04/2017ISA ` I `� RBDMS ` moo` i - 3 2017 Submit Original Only Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary September 21, 2017 To Whom it May Concern: DECEIVED SEP 2 5 2017 Attached please find the Report of Sundry Well Operations for Setting of a Liner Top Packer for Well B -36A, PTD # 217-073. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Packers and SSV's Attachment PBU B -36A SW Name Type MD TVD Depscription B -36A TBG PACKER 10382.52 8281.15 4-1/2" Baker S-3 Perm Packer B -36A TBG PACKER 10563.65 8414.51 4-1/2" Baker S-3 Perm Packer B -36A PACKER 10882 8647.79 3-1/2" Baker 45 KB Packer Casing / Tubing Attachment PBU B-36A Casing Length Size MD TVD Burst Collapse CONDUCTOR 78 20" 91.5# H-40 36 114 36 114 1490 470 SURFACE 3613 9-5/8" 40# L-80 36 3649 36 3339 5750 3090 INTERMEDIATE 32237' 26# L-80 33 3256 33 3051 7240 5410 INTERMEDIATE 6485 7" 26# L-80 3250 9735 3047 7799 7240 5410 INTERMEDIATE 1088 7" 29# 13CR80 9735 - 10823 7799 8606 8160 7020 LINER 650 3-1/2" 9.3# 13Cr85 10898 - 11548 8658 8931 10160 10530 LINER 1199 3-1/4" 6.6# 13Cr85 11548 - 12747 8931 9043 TUBING10506 4-1/2" 12.6# 13Cr80 31 - 10536 31 8394 8430 1 7500 TUBING 89 4-1/2" 12.6# L-80 10532 - 10620 8391 8456 8430 7500 Daily Report of Well Operations PBU B -36A ACTIVITYDATE SUMMARY ***WELL SHUT IN ON ARRIVAL*** (Post CTD) RU SWCP 4518 TO SET LTP 8/25/2017 ***CONT. ON 08/26/17 WSR*** T/1/0=2300/1800/200 Temp=Sl (LRS Unit 72 - Assist Slickline: Liner Top Packer) Pumped 2 bbls 8/25/2017 50/50 meth and 10 bbls crude down Tbg to start load ***Job Cont to 08-26-2017 WSR*** ***WELL FOUND S/I ON ARRIVAL*** (Post CTD) DRIFT TO DEVIATION W/ 2.25" CENT, 1.75" S. BAILER @ 11790' SLM RAN BP TANDEM SBHPS GAUGES ACCORDING TO PROGRAM 8/26/2017 ***WELL LEFT SHUT IN, PAD -OP NOTIFIED*** ***CONT. FROM 08/25/17 WSR*** (Post CTD) RAN DUMMY LTP TO DEPLOYMENT SLV AT 10858' SLM, SET W/ LRS ASSIST. SET LTP IN DEPLOYMENT SLV @ 10861' SLM W/ LRS ASSIST. (OAL= 22', top of LTP @ 10882' md, 2.31" x -nip @ 10900' md) LRS PERFORM PASSING MIT -T TO 2160 PSI. PULL 2-7/8" XX PLUG FROM LTP AT 10862' SLM. 8/26/2017 ***JOB COMPLETE*** ***Job Cont from 08-25-2017 WSR*** (LRS Unit 72 -Assist Slickline: Load & Test) Pumped 170 bbls crude (180 total) down Tbg for load. Pumped 58 bbls crude down Tbg for injectivity test. Got -4.5 bpm at 2000 psi for injectivity test. Pumped 9 bbls at 2bpm while Stine set drift plug. Pumped 39 bbls crude down Tbg for injectivity test after SLine set drift plug. Got an injectivity of 2.5 bpm @ 2050 psi. S -Line Set LTTP, MIT -T ***PASSED*** to 2233 psi. Max Applied = 2400 psi. Target = 2160 psi. Loss of 92 psi 1st 15 min, Loss of 25 psi 2nd 15 min. Bled down To 750. Pumped 5.9 bbls crude down Tbg to reach test pressure. S -Line on location upon departure 8/26/2017 FWHP=750/1290/200 Fluids Summary Bbls Type 2 50/50 Methanol/Water 342 Crude 3 Diesel 3== -L AD= RLC RJATOR = 3. ELEV = 76.91' ELEV = 76.91' ELEV = 43.23' 20" COPD. 110' = 1250' Angle = 114" OM 13607 D - 19.124' im AD= 11396' Im TVD= saw. SSI 7• CSG, 26#, L -BO BTC, D = 6.276" 3244' 9-5/8" CSG, 40#, L-80 BTC, D = 8.835' 3649' T CSG, 26#, L-60 HTGM. D= 6.276' - 9736 Minimum ID = 2.31" @ 10900' HES X NIP IN LTP w/PTSA 4-12' TBG, 12.6#, 13CR-80 VAM TOP 10512' 8 JFE BEAR, .0152 bpf, D = 3.958' 4-1/2" 4-1/2• LNR J1 10614- D = 2.992• 1 -UKKW w/RAUDACTNE PP TAG (06/09117) —f 1161 RR(AHOE BAY II IT WELL: B -36A PEATT Pb: 217-073 AR No: 50-029-22667-01 SEC 31, Tl lN, R14F- 529' FNL 8 1894' FEL 4-1/2' LNR, 12.6#, 13CR NSCT, .0152 bpf, D = 3.953" —115 kU TVD LNR 6.60, 13CR-85 TCS .0079 bpf, D = 2.850'1193 PERFORATION SIAWARY REF LOG. ON _/ 1 ANGLE AT TOP PERF: 111' @ 13553' Note: Refer to production DB for historical perf data SIZE I SPF I MERVAL I Opn/Sgz I SHOT SOZ 2- 112-7/8• LNR PBTD 13666' .441• 13702' . ETY NOTES: WELL ANGLE> 70' @ 11495'*** B -313A CHROME TBG, CSG & LINER`••MAX DLS: 26.8' 11741'. 2086' 4-1/2• HES X NP, D = 3.813• 3193' 7• HES Es CB.�ns2 3206' 9-5/8• X 7.13KR EG PKR GAS LFT MANDRELS 10374' I—j7" X 4-12' BKR S-3 PKR D = 3.870' X 4-12' UJDLIE OV ERSH0T 12-FESX NP,D=3.813' X 4-12' BKR S-3 R(R D = 3.875" 12•HES XNP, D=3.813" 3.80' 10' TMVTE-BACK SLV I-12' WLEG. D = 3.951 X 4-12' TNV DOV E TAL 'DRO FIGR, I BKR LTP w /PBA, D = 2.44' 0898' 1-13.70' BKR DEPLOYMENT SLV, D = 3.00' 0800' HES X NP, D = 2.31' 0920' 3-12• X NP, D = 2.813' 1648' 3-12' X 33/16' XO, D = 2.786' MLLOUT WNDOW (B -36A) 11550'- 11560' 1931' 3-3/16' X 2-7/8' XO, D = 2.377' 2747' PLAJTw/RATAG RR(AHOE BAY II IT WELL: B -36A PEATT Pb: 217-073 AR No: 50-029-22667-01 SEC 31, Tl lN, R14F- 529' FNL 8 1894' FEL DATE REV BY COM. NTS DATE REV BY COMu NTS kU TVD DEV TYPE VLV LATCH PORT DATE 06/08/17 JM) BUILT PROPOSED I—F2 BP Exploration (Alaska) 3804 6909 8942 10266 3452 5706 72(19 8196 43 42 42 41 KGB2 KGB2 KG62 KG82 DOMEJ DOW DA1Y DAM BK BK BK BK 16 16 0 0 JWV16�17 0311 0911 09110108 10374' I—j7" X 4-12' BKR S-3 PKR D = 3.870' X 4-12' UJDLIE OV ERSH0T 12-FESX NP,D=3.813' X 4-12' BKR S-3 R(R D = 3.875" 12•HES XNP, D=3.813" 3.80' 10' TMVTE-BACK SLV I-12' WLEG. D = 3.951 X 4-12' TNV DOV E TAL 'DRO FIGR, I BKR LTP w /PBA, D = 2.44' 0898' 1-13.70' BKR DEPLOYMENT SLV, D = 3.00' 0800' HES X NP, D = 2.31' 0920' 3-12• X NP, D = 2.813' 1648' 3-12' X 33/16' XO, D = 2.786' MLLOUT WNDOW (B -36A) 11550'- 11560' 1931' 3-3/16' X 2-7/8' XO, D = 2.377' 2747' PLAJTw/RATAG RR(AHOE BAY II IT WELL: B -36A PEATT Pb: 217-073 AR No: 50-029-22667-01 SEC 31, Tl lN, R14F- 529' FNL 8 1894' FEL DATE REV BY COM. NTS DATE REV BY COMu NTS 05122196 N28E ORIGINAL COMPLETION 062V17 JNJJAD AOO® BF 8 REF ELEV 09104/06 D16 RWO 07/03/17 JAD ORLG HD CORRECTIONS 09/1'1108 D16 RWO 07/05/17 RdJArD FINAL ODE APPROVAL 07101117 N-COR2 CTD SIDETRACK(B-36A) 07110117 JCIJAD ADPE RFS (07106/17) 06/08/17 JM) BUILT PROPOSED 08/30/17 BSEIJMD SET LTPw IPTSA 8 X NIP (08/26117) BP Exploration (Alaska) 06/22/17 JTMJMJ ALL® XN NP 8 SET WS w /RP TAG BA ER %' PRINT DISTRIBUTION LIST ily limb a GE company COMPANY BP Exploration Alaska 1 WELL NAME B -36A V FIELD Prudhoe Bay Unit AUG 0 8 2017 21 7073 28471 se sign and return one copy of this transmittal form to: Exploration (Alaska) Inc. rotechnical Data Center, LR2-1 DATA L % oGE I E. Benson Blvd. M. K. SENDEr :horage, Alaska 99508 COUNTY PRUDHOE BAY nnGCC LOGTYPE RPM:PNC3D BHI DISTRICT Alaska AUTHORIZED BY Paul Canizares EMAIL Paul Canizares(a)bakerhuohes.com LOG DATE July 5, 2017 TODAYS DATE August 6, 2017 Revision STATUS Final Replacement: No Details: Rev. Requested by: --- COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V 1 1 BP North Slope. :EOA, PROC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 2 IIConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 3-344 700 G Street Anchorage, AK 99510 3 ExxonMobil, Alaska Attn: Lynda M. Yaskell andror Lisa Boggs 3201 C Street, Suite 505 Anchorage, AK 99503 4. State of Alaska - AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 51DNR - Division ofOil & Gas *" Attn: James Hyun 550 West 7th Avenue, Suite 802 'Anchorage, Alaska 99501 i""-• Stamp "confidential' on all material deliver to DNR' FIELD I FINAL CD/DVDFINAL PRELIM (las, dlis, PDF, META, SURVEY REPORT LOGS LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES # OF COPIES 9 lu 4 4 1; 0 10 1 1 1 0 10 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, aR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 Attn: Gerardo Cedillo TOTALS FOR THIS PAGE 0 2 5 0 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMS -)N WEL_ .;OMPLETION OR RECOMPLETION REPti AND LOG 1a. Well Status: Oil m Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ Well Class: 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One 11b. Development 0 Exploratory ❑ Service ❑ Stretigrephic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 7/6/2017 217-073- 17-073-3. 3-Address: 7. Dale Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 6/21/2017 50-029-22667-01-00, 4a. Location of Well (Governmental Section): S. Date TD Reached: 16, Well Name and Number: 6/26/2017 • PBU B -36A • 9 Ref Elevations KB 76.91 17. Field/Pool(s): Surface: 4751' FSL, 1894' FEL, Seo. 31, TI IN, R14E, UM • Top of Productive Interval: 485' FSL, 4441' FWL, Sec. 29, T71 N, R14E, UM GL 41.33 . BF 43.23 PRUDHOE BAY, PRUDHOE OIL 10. Plug Back Depth(MD/TVD): 18. Property Designation: Total Depth: 1882' FSL, 896' FWL, Sec. 28, T11 N, R14E, UM • 13666'/ 8866' - ADL 028310 & 028309 ' 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 663734 • y- 5950115 Zone - ASP 4 • 13702'/ 8853' • 89.034 TPI: x- 670042 y- 5951269 Zone - ASP 4 12. SSSV Depth (MO/TVD): 20Thickness of Pennafmat MDTVD: Total Depth: x- 671746 y- 5952485 Zone - ASP 4 None 1900' (Appmx.) 5. Directional or Inclination Survey: Yes RI (attached) No ❑ 13. Water Depth, 1 Offshore: 21. RedrilBLatend Tap Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) - 11550'/ 8932' - 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma my, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD/GR/RES 23' CASING, LINER AND CEMENTING RECORD CASING Wr. PER GRADE FT. SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H40 36' 114' 36 114' 30" 260 sx Arctic Set (Approx.) 9-5/8" 60# Lda 36' 3649' 36' 333W 12-1/4" 1375 sx CS III, 335 ax Class'G'. 300 sx CS 11 7" 26#/29# LawlXft 33' 10823' 33' 8606' 8-112" 225 sx Class'G 4-1/2" 12.6# 13CM 10614' 11550' 8452' 8932' 6" 236 sx C4ws'G' -1/2"x3-1/4" 9.3#/6.6 13OW 10898' 13702' 8658' 8853' 1 4-1/4' 137 sx Class'G' x2-7/8" /6.5# 24. Open to production or injection? Yes ® No ❑ 25. TUBING RECORD If Yes, list each interval open (MDRVD of Top and Bottom; Perforation Size and Number): GRADE DEPTH SET (MD) PACKER SET (MD/FV 4-1/2" 12.6# 13Cr80/L-BD 10620' 10383' / 8282' 2" Gun Diameter, 6 spf 10564-18415- 0564'/8415'13553'-13573' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 13553'- 13573'8910'- 8903' E C E i V E C Was hydraulic fracturing used during completion? Yes ❑ No ® • Per AAC 25.283 (i)(2) attach electronic and printed information DATE DEPTHINTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 11 ti) i, AUG 0 3 2011 VERIFIED 2500' Freeze Protect w/ 40 Bbls Diesel ' AOGCC 27. PRODUCTION TEST Date First Production: July 8, 2017 Method of Operation (Flowing, gas lift, etc.): Flowing Date of Test: 7/9/2017 Hours Tested: Production for Oil -Bbl' Gas -MCF: Water -Bbl: Choke Size: Galtl Ratio: 4 Test Penod -11-321 4403 0 96 13710 Flow Tubing 980 Press Casing Press: 1240 Calculated 24 Hour Rate --w Oil -Bbl: 1927 Gas -MCF: 1 26415 Water -BN: 0 Oil Gravity- API (oxr): WA Farm 10.407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only 8 2017 RBDMS '-� All" 28. CORE DATA 1 Conventional Core(s) Yes ❑ No ® .i Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology, and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost -Top Well Tested? Yes ❑ No Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 11343' 8855separate sheets to this form, if needed, and submit detailed test Information per 20 AAC 25.071. CGL-Zone 3 11178' 8788' Base of CGL - Zone 2C 11343' 8855' 23SB - Zone 2B 11472' 8907' Kicked off from Parent Well B-36 11550' 8932' 22TS 11670' 8980' 21TS-Zone 2A 11803' 9039' 22TS (Invert) 13196' 9026' 23SB - Zone 2B 13392' 8965' Base of CGL - Zone 2C 13553' 8910' Formation at total depth: Zone 2C (From Base) 13553' 1 8910' 31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post-Rig Work, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Ciolkosz, Ryan R Authorized Tifle: Info at n and DWa ont er Contact Email: Ryan.Ciolkosz@bp.com Authorized Signature: te: ib Contact Phone: +1907 564 5977 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10407 well completion report and 10404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item Ia. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this forth and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in Item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well lest results. Form 10407 Revised 5/2017 Submit ORIGINAL Only TREE= _ RNC WELLHEAD = ACTUATOR= VLV LATCH OKB. ELEV = 76.91' 4 REF ELS/ = 76.91' KGB2 BF. ELEV = 43.23' 16 20' COND. KOP= 1250' 5706 42 91.571, H.40, Max Angle = 114'@ 136OZ 16 03/16/17 2 8942 7209 42 D= 19.124' Datum MD = 11396' 0 09/10/08 Datum TVD = 8". SS] 81961 41 1 KG82 T CSG, 260, L-80 BTC. D = 6.276' BK 9-5/8' CSC, 400. L-80 BTC. D = 8.835' 7' CSG, 260, L-80 BTC -M. D= 6.276' 1 3244' 1 Minimum ID = 2.377" @ 11931' 33/16" X 2-7/8" XO 4-12' TBG, 12.60, 13CR-80 VAM TOP 8 JFE BEAR, .0152 bpf, D = 3.958' 41/2' TBG STUB (09/09/081 7- CSG, 290, 1 10512' 1 13-1/2' X 3-1/4'X 2-78' TOU TOC I 41/2' LNR, 12 .60, 13CR NSCT, 111550' .0152 bpf, D = 3.953' LNR 6.6#, 13CR-85 TCI, .0079 bpf, D = 2.850' 11931' PEWORATI IN SUMIMRY MF LOG: ON ANGLE AT TOP FEtiF: 111' @ 13553' Note: Refer to Production DB for historical perf data S¢E SPF Kn3WAL Opn/Sgz SHOTI SOZ 3 2-7/e' LNR 6.5#. 13CR-66 STL, .0058 bpf, D = 2.441' TY NOTESWELL 70- * C1TBG,CSGSLINER***MAXDLS:26-8°B-36A 11741'. •' 2086' 4-12' FES X NP, D = 3.813' 3183' 7' HFS EF CBr1B7TH2 GAS LFT MAN7fa=LS ST MJ TVD DB/ TYPE VLV LATCH PORT DATE 4 3804 3452 43 KGB2 DOME BK 16 03/16/17 3 6909 5706 42 KGB2 DOME BK 16 03/16/17 2 8942 7209 42 KGB2 DW BK 0 09/10/08 1 10266 81961 41 1 KG82 Dbfl' 11 BK 0 09/10/08 FESX NP. D=3.813' 17' X 4-1/2' BKR S-3 PKR D= 3.870' 1 4-12' UNIQUE OV ERSFDT 2'FESXNP,D=3.813' 14-12' HES X NP. D = 3.813' 1 •1 10614'—j10'TIWTEBACKSLV,1D=5.241' REV BY 10620' 4-12-WLEG, D=3.958' 10629' ELMD TT LOGGED 06/16/96 10-62� 7-X4-12'Tw LTP. D=3.861' I HYDRO HGR. D=3.915' I 3.70' BKR DEPLOY MBNT SLV, D = 3.00' n�-1rv< nr.a�o nv,u=ciao- I MLLOUT WINDOW (B -36A) 11550'- 11560' 1231,l -43 -3/i6 -X2 -718 -XO . 113=2377- DATE =2377' DATE REV BY COMM6411'S LATE REV BY COMP NTS 05122196 N28E ORIGINAL COMPLETION 06/22/17 JN /JMJ ADO® BF B REF ELEV 09/04/06 016 RWO 07/03/17 JMJ DRLG HO CORMIMNS 09/11/08 Dib RWO 07/05/17 RCUM3 FWLODEAPPROVAL 07/01/17 N-CDR2 CTD SIDETRACK (B -36A) 07/10/17 JCJJMJ ADPWS(07/06/17) 06/08/17 JM) BUILT PROPOSED 06/22/17 JTMJMJ MLLED XN NP 8 SET WS w /PP TAG PRUDHDE BAY UNIT WELL: B36A P9iMT No: 217-073 AR No: 50.029-22667-01 SEC 31, T11 N R14E 529 FN- 8 1894' FEL BP Exploration (Alaska) Printed 822017 4:06:37PM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 1 or 12 Operation Summary Report Common Well Name: B-36 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 61192017 End Date: X3-018HL-C:(2,576,514.00) Project: Prudhoe Bay Site: PB B Pad Rig Name/No.: CDR-2 Spud Date/Tme: 4/30/1996 12:00:OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000626 Active datum: KB @76.91 usft (above Mean Sea Level) Date From- To Him Task Code NPT Total Depth Phase Description of Operations hr usft 6/192017 1600 - 19:15 3.25 DEMOB P PRE RELEASE RIG OFF C-11 B, FINISH RIG DOWN, MOVE RIG TO B-PAD 19:15 - 22:15 3.00 DEMOB P PRE ARRIVE B-PAD VERIFY VALVES CLOSED AND PRESSURE BELOW 50 PSI. 12 x 12 CHOCK BLOCK IN PLACE. SPOTTERS ASSIGNED RADIO COMMUNICATION VERIFIED I SPOT RIG AND SET DOWN I "`RIG ACCEPTED AT 22:15- 22:15 - 00:00 1.75 RIGU P PRE WORK ON RIG UP CHECKLISTS 620/2017 00:00 - 01:00 1.00 RIGU P PRE CONTINUE WITH RIG UP CHECKLIST 01:00 - 03:30 2.50 RIGU P PRE RU TO WING VALVE- PERFORM LTT ON SWABS / MASTER TO 3500#. GOOD TEST NIPPLE DOWN TREE CAP. NIPPLE UP 4-1/16" x7-1/16"ADAPTER NIPPLE UP MPD LINE. CONTINUE RIGGING UP 03:30 - 06:00 2.50 BOPSUR P PRE COMPLETE RIG UP CHECKLIST. INSTALL MP LINE AND DRILLNG SPOOL. INSTALL BOPS. 06:00 - 1415 8.25 SOPSUR P PRE INSTALL TURNBUCKLES, FLUID PACK STACK TEST BOPS AS PER CHECKLIST. 25013.500 PSI EACH TEST FOR 5 MIN. TEST ANNULAR WITH 2-3/8" AND 3-1/2" TEST JOINT, UPPER BLIND SHEARS, UPPER 2-3/6" PIPE SLIPS, 3" PIPE SLIPS, VBRS WITH 2-3/8" AND 312" TEST JOINT, LOWER BLIND SHEARS, AND LOWER 2-3/8" PIPE SLIPS. WITNESS WAIVED BY AOGCC REP JEFF 14:15 - 17:00 2.75 BOPSUR P PRE JONES. LINE UP AND TEST INNER REEL VALVE. PUMP 60 BBLS FORWARD TO COMPLETE CABLE SLACK MANAGEMENT. LINE AND TEST Ce, C9 FROM THE OPPOSITE 1700 - 1830 1.50 BOPSUR P PRE SIDE. INSTALL BHI FLOATS AND PRESSURE TEST. 18:30 - 19:00 0.50 BOPSUR P PRE PRESSURE TEST UQC SUB CONNECTION. CONDUCT RIG EVAC EXERCISE WITH VANCLEVE CREW. ALL PERSONS MUSTER AND ACCOUNTED FOR IN 3 MIN. CONDUCT AAR FOLLOWING THE DRILL. 19:00 - 20:00 1.00 BOPSUR _ P PRE HOLD PRE-SPUD MEETING WITH RIG CREW__ REMOVE TEST SUB FROM END OF CT. 1 MAKE UP INJECTOR TO WELLAND TORQUE TREE BOLTS. LOAD BPV LUBRICATOR ONTO RIG. BPV CREW GETS INDEPENDENT STACK MEASUREMENTS. Printed 822017 4:06:37PM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 2 or 12 Operation Summary Report Common Well Name: B-36 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 End Date. X3-018HL-C: (2,576,514.00) Project: Prudhoe Bay Site: PB B Pad Rig Name/No.: CDR -2 Spud Date/Time: 4/30/1996 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000626 Active datum: KB @76.91 usft (above Mean Sea Level Date From -To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) PRE PJSM AND REVIEW PROCEDURE FOR 20:00 - 23:00 3.00 BOPSUR P PULLING TWC. LOAD BPV LUBRICATOR TO RIG FLOORAND MAKE UP EXTENSIONS. MAKE UP BPV LUBRICATOR TO WELL. PRESSURE TEST BPV LUBRICATOR TO 2501 3,500 PSI, GOOD. PULL BPV, ABOUT 500 PSI ON WELL. BLEED OFF PRESSURE, PURGE BPV LUBRICATOR WITH MEOH OUT TO TIGER TANK. RIG DOWN AND OFFLOAD BPV EQUIPMENT. PRE PJSM THEN MAKE UP NOZZLE BHA. PRE PRESSURE TEST LUBRICATOR TO 3,500 PSI, 23:00 - 00:00 1.00 RIGU P 6/21/2017 00:00 - 01:30 1.50 RIGU P GOOD. CONFIGURE PITS FOR BOTTOM KILL. PUMP 5 BBLS MEOH TO END OF CT. 01:30 - 03:00 1.50 RIGU P PRE CONDUCT PJSM FOR INITIAL WELL ENTRY. OPEN WELL TO CLOSED CHOKE. WELL SHOWS 60 PSI. BLEED OFF TO TIGER TANK. CHECK PRESSURE AT RIG FLOOR, NO PRESSURE SEEN. OPEN RISER AND OBSERVE WELL, EVALUATE FEASIBILITY OF MAKING UP THE MILLING BHA. VERY SLIGHT BUBBLING SEEN. MAKE UP RISER, PT TO 3,500 PSI, GOOD. P PRE RIH, DISPLACE WELL FLUIDS TO TIGER TANK 03:00 - 06:00 3.00 RIGU HOLD 150 PSI WHP. TAG WHIPSTOCXK@11,53755K PUW VERIFING DISPLACEMENT AT FLOWBACK TANK PUMPING 0.63 BPM / 06:00 - 08:15 2.25 RIGU P PRE DISPLACE WELL TO 1% KCL -PUMP 1.5 HOLE VOLUME 185 BBLS AT 3.5 BPM/ 188OPSI -FLOWCHECK WELL FOR 10 MINUTES, WELL STATIC -DISPLACE WELLBORE FLUIDS TO 8.6 PPG USED DRILLING -ONCE MUD START OUT OF NOZZLE START POH PRE POH PUMPING 8.6 USED DRILLING FLUID 08:15 - 10:30 2.25 RIGU P 3.5 BPM / 2350 PSI -STOPAT 200 FOOTAND FLOW CHECK WELL, STATIC 10:30 - 11:15 0.75 RIGU P PRE LD BHAAND SECURE WELL -1.5 BBLS MORE DISPLACEMENT THAN CALCULATED 11:15 - 12:00 0.75 RIGU P PRE CONDUCT PRE -SPUD MEETINGAND TABLE _ TOP DRILL ON H2S RESPONSE WEXIT MAKE UP MILLING BHA 12:00 - 13:00 1.00 STWHIP P - PRESSURE TEST QTS TO 3,500 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 12:45 13:00 - 16:00 3.00 STWHIP P WEXIT RIH WITH MILLING BHA -0.25 BPM 1990 PSI Printed 8/2/2017 4:06:37PM •A8 depths reported in Drillers Depths' Printed 81212017 4.06:37PM *All depths reported in Drillers Depths' North America - ALASKA - BP Page 3 or 12 Operation Summary Report Common Well Name. B-36 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 End Date: X3 -018H1 --C: (2,576,514.00) Project: Prudhoe Bay Site: PB B Pad Rig Name/No.: CDR -2 Spud Datemme: 4/30/1996 12:00 OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000626 Active datum: KB @76.91 usR (above Mean Sea Level) Date From- To Hrs Task Code NPT Total Depth Phase - Description W Operations (hr) (usR) 16:00 - 00:00 8.00 STWHIP P WEXIT MILL 3.80"WINDOW IN 4-1/2"CASING/LINER PER BAKER REP FROM 11,537.7' MD TO 11,543.1'MD - RATE: 2.84 BPM IN, 2.84 BPM OUT - MUD WEIGHT: 8.66 PPG IN, 8.68 PPG OUT -DWOB:1-3 KLBS i- CIRC PRESSURE: 2,720 PSI - MILL RATHOLE 7O 11,555' MD. - PUMP 10 BELS HI -VIS SWEEP AROUND. 6/22/2017 00:00 - 01:00 1.00 STWHIP P WEXIT CONDUCT ONE REAMING PASS, NOTHING SEEN. DRY DRIFT OF WINDOW IS CLEAN. SAMPLE FROM MID RATHOLE IS MOSTLY STWHIP P WEXIT FORMATION. POOH. 01:00 - 02:45 1.75 FLAG PIPE AT 11,400 FT EDP. OPEN EDC, PAINT FLAG, FLOWCHECK WELL, STATIC. PUMP 3.53 BPM / 2,700 PSI. BUILD BHA #2 AND HANG FROM PDL WINCH STWHIP P WEXIT WHILE POOH. AT 1,000' MM OUT DENSITY IS REDUCED, 02:45 - 03:30 0.75 WITH INCREASE IN WHP. STOP CTAND SHUTDOWN PUMP, FLOWCHECK WELL. ZERO LEL ON ALL GAS SENSORS. MUD BALANCE MEASUREMENT IS Or 8.6# HEAVY. 10 MIN FLOWCHECK IS GOOD, NO FLOW. CIRCULATE OUT TO TIGER TANK FOR 5 MIN, IN AND OUT MM READING 1:1 WITH SOLID DENSITY, HOWEVER WHP IS HIGHER THAN NORMAL. SUSPECT PARTIALLY PLUGGED STWHIP P WEXIT CHOKE OR OUT MM. CONTINUE POOH. 03:30 - 04:00 0.50 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC - CLOSE EDC, POWER DOWN - INJECTOR OFF: 04:05 DRILL P PROD1 - MILL IS 3.79" NO-GO, 3.80 GO" MAKE UP 4.25" DRILLING BHA #3 04:00 - 05:00 1.00 - PICK UP 2.875: ULS MOTOR (1.95"DEG AKO) AND 3 COILTRAKTOOLS - MAKE UP 4.25 HYCALOG BICENTER BIT - SURFACE TESTED TOOL. GOOD TEST. - PRESSURE TEST QTS TO 250 PSI LOW FOR 5 MINUTES 13500 PSI HIGH FOR 5 MINUTES 3.50 DRILL + P PRODt - INJECTOR ON: 05:05 RIH PUMPAT 0.25 BPM/880 PSI 80 FPM 0500 - 0830 -TIE-IN LOG, +12' CORRECTION -8.7 PPG IN / 8.77 PPG OUT Printed 81212017 4.06:37PM *All depths reported in Drillers Depths' North America - ALASKA - SP Page 4 of 12 Operation Summary Report Common Nall Ni B-36 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/192017 End Date: X3-016HL-C: (2,576,514.00 ) Project: Prudhoe Bay I Site: PB B Pad Rig NameMo.: CDR -2 Spud DateRime: 4/30/1996 12:00 00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000626 Active datum: KB @76.91 usR (above Mean Sea Level) Daa From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 08:30 - 20:00 11.50 DRILL P PROD? DRILL4.25" BUILD FROM 11,566' MD TO 11,920' MD - FREE SPIN: 3065 PSI, 2.8 BPM - RATE: 2.77 BPM IN, 2.78 BPM OUT. CIRC 'PRESSURE: 3050-3302 PSI - MUD WEIGHT: 8.81 PPG IN, 8.85 PPG OUT, ECD: 10.42 PPG j -ROP: 35-65 FT/HR, WOB: 1.5-3.5 KLBS I PRESSURES AT WINDOW 8.7 PPG MUD I CHECK#12.0 BPM ANNULUS 46251 SURFACE PSI - 2326 WP 43, 2.25 BPM ANNULUS = 4647 PSI, PUMP 2512, WHP 56 2.5 BPM ANNULUS 4670 PSI, 2700 PUMP, 56 PSI WHP CHECK #22.0 BPM ANNULUS 4649/ SURFACE PSI -2317 WP 41, 2.25 BPM I ANNULUS = 4675 PSI, PUMP 2538, WHP 48 2.5 BPM ANNULUS 4700 PSI , 2829 PUMP, 56 PSI WHP 20:00 - 22:45 2.75 DRILL P PROD1 DRILL 4.25" BUILD FROM 11,920' MD TO 11,872' MD - FREE SPIN: 3,300 PSI, 2.76 BPM �- RATE: 2.76 BPM IN, 2.76 BPM OUT. CIRC PRESSURE: 3,300 - 3,500 PSI - MUD WEIGHT: 8.81 PPG IN, 8.86 PPG OUT, ECD: 10.42 PPG - FOR 30 - 50 FT/HR, WOB: 1.5 - 3.5 KLBS STACKING WEIGHT AT 11,920'. PULL WIPER TRIP BACK TO WINDOW. TIE-IN DEPTH WHILE AT WINDOW, CORRECT -2 FT. USE MPD CHOKE TO MAINTAIN 10.1 PPG WHILE AT THE WINDOW. CLEAN PASS UP AND DOWN. DRILL PAST 11,930' PUMP 5 BBLS LO / HI VIS SWEEPSAROUND. SWEEPS DONT BRING BACK MUCH ADDITIONAL CUTTINGS. BLEED IA ONCE FROM 180 PSI TO 60 PSI. 22:45 - 23:30 0.75 DRILL N PRODI WIPER TO WINDOWTO TIE-IN. DEPTH COUNTER HAS BEEN STICKING AND NOT RECORDING DEPTH PROPERLY. CLEAN COUNTER WHEEL. TIE-IN TO RA TAG, CORRECT -59 FT. RIH TO FINISH BUILD SECTION. 23:30 - 00:00 050 DRILL P PROD1 DRILL4.25"BUILD FROM 11,970'MDTO 11,983' MD - FREE SPIN: 3,200 PSI, 2.76 BPM - RATE: 2.76 BPM IN, 2.75 BPM OUT. CIRC PRESSURE: 3,200 - 3,500 PSI - MUD WEIGHT: 8.84 PPG IN, 8.94 PPG OUT, ECD: 10.42 PPG FOR 30-50 FT/HR, WOB: 1.5-3.5 KLBS Printed 802017 4*06:37PM 'All depths reported in Drillers Depths' Printed 8/2/2017 4:06:37PM •AII depths reported in Drillers Depths' North America - ALASKA - BP Page 5 of 12 Operation Summary Report Common Well Name: B-36 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 End Date: X3-018HL-C: (2,576,514.00) Project: Prudhoe Bay I Site: PB B Pad Rig Name/No.: CDR -2 Spud Date/rim: 4/30/1996 12*00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000626 Alive datum: KB @76.91 us0 (above Mean Sea Level Date From -To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usll 6/23/2017 00:00 - 00:30 0.50 DRILL P 12,020.00 PRODI DRILL 4.25' BUILD FROM 11,983' MD TO I :12,020' MD �- FREE SPIN: 3,200 PSI, 2.76 BPM - RATE: 2.76 BPM IN, 2.75 BPM OUT. CIRC PRESSURE: 3,200-3,500 PSI - MUD WEIGHT: 8.84 PPG IN, 8.94 PPG OUT, ECD: 10.42 PPG - ROP: 30 - 50 FT/HR, WOB: 1.5 - 3.5 KLBS 00:30 - 02.30 2.00 DRILL P 12.020 00 PRODI _-_DRILLTO END OF BUILD SECTION. _ PUMP 5 BBLS LO / HI VIS SWEEPSAROUND MONITOR WELL FOR 10 MINUTES: STATIC - MUD WEIGHT: 8.86 PPG IN, 8.91 PPG OUT - RATE: 3.52 BPM IN, 3.50 BPM OUT OPEN EDC, JET WHIPSTOCK TRAY - RATE: 3.51 BPM. CIRC PRESSURE: 3,350 PSI - PUMP 1.5X B/U FROM WINDOW. - SWEEPS + B/U BRINGING BACK 50% 02:30 - 03:45 1.25 DRILL P 12,020.00 PRODI EXCESS CUTTINGS. DISPLACE WELL WITH 9.8# MUD FROM THE WINDOW. -FLOW CHECK WELL, STATIC 03:45 - 06:15 2.50 DRILL P 12,020.00 PRODI POOH - MUD WEIGHT: 9.85 PPG IN, 9.76 PPG OUT - RATE: 1.51 BPM IN, 0.95 BPM OUT OPEN EDC, POH -FLOW CHECK WELLAT 200' MD, WELL STATIC NO LOSSES ON TRIP OUT OF HOLE 06:15 - 06:45 0.50 DRILL P 12,020.00 PROD? LD BHA -POP-OFF INJECTOR AT 06:30 -SET BACK MWD OFF TO THE SIDE 1.00 T _ _ _ __ DRILL P 12,020.00 PROD1 -LD MOTOR AND BIT MU BHA 06:45 - 07:45 MAKE UP 4.25" DRILLING BHA #4 - PICK UP 2.875X" ULTRA LS MOTOR (1.1 ° AKO) AND 3.0° COILTRAK TOOLS - MAKE UP HCC RWD2ST3053 P78 CUTTER BICENTER BIT - SURFACE TESTED TOOL. GOOD TEST. - PRESSURE TEST OTS TO 250 PSI LOW FOR 5 MINUTES / 3500 PSI HIGH FOR 5 MINUTES, GOOD TEST - INJECTOR ON: 07:50 REPAIRED DEPTH TRACKER WHILE CHANGING BHA 07:45 - 12:30 4.75 DRILL P 12,020.00 PROD1 RIH WITH 4.25"DRILLING BHA #4 FROM SURFACE TO 12020' MD RATE: 0 BPM IN, 0.28 .28 BPM OUT. CIRC PRESSURE: 1360PSI - MUD WEIGHT: 8.73 PPG IN, 9.83 PPG OUT- ' DISPLACING WHILE RIH - LOG DOWN FOR TIE-IN FROM 10820 TO 10889'MD WITH+16.5'CORRECTION - PU 47 KLBS, SO 17 KLBS -CIRC FOR 15 MINUTES AT WINDOW TO FINISH GET 9.8 PPG MUD OUT -CLOSE EDC -RIH THROUGH WINDOW WITHOUT ISSUES Printed 8/2/2017 4:06:37PM •AII depths reported in Drillers Depths' North America - ALASKA - BP Page 6 of 12 Operation Summary Report Common Well Name: B-36 ARE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 End Date: X3-018HL-C: (2,576,514.00) Project: Prudhoe Bay Site: PB B Pad Rig Name/No.: CDR -2 Spud DateTme: 4/30/1996 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI. USA00DO0626 Active datum: KB @76.91 usft (above Mean Sea Level) Date From -To Him Task Code NPT Total Depth Phase Description of Operations (hr) (uslt) 12:30 - 14:30 2.00 DRILL P _ _' 12,195.00 PROD1 DRILL 4.25"LATERAL FROM 12020'MD TO 12195' MD - FREE SPIN: 2780 PSI ,3065PSI ON BOTTOM - RATE: 2.85 BPM IN, 2.85 BPM OUT. j - MUD WEIGHT: 8.75 PPG IN, 8.79 PPG OUT, ECD:10.66 PPG - ROP: 40-125 FT/HR, WOB: 2 3.5 KLBS OBSERVED DWOB COMING OFF AND PULLED UP, STUCK ON BOTTOM 14:30 - 17:00 2.50 DRILL N _ 12,195.00 PROD1 PULLED 80K. NO MOVEMENT. SEEING IT ON WOB. NO PROBLEM ORIENTING. DIFFERENTIALLY STUCK PUMP CUTTINGS UP HOLE. LET RELAX. ATTEMPTED TO PULL FREE. NO MOVEMENT. PUMP 15 BELS 1% KCL SPACER / 20 BBLS ,MINERAL OIL/15 BBLS 1%KCL LET SOAK WITH 10 BBLS OUT BIT. PULLED _ FREE. PUMP LVT AND SPACERS OUT OF BIT. 12,195.00 PROD1 PULL BACK TO WINDOW FOR TIE -1 N. 17:00 - 18:30 1.50 DRILL N CORRECT+8 FT. PULLING 1 O OVER THROUGH MASSIVE SHALE ZONEAROUND 11,950'. MOSTLY CLEAN PASS BACK TO BOTTOM. USE AS DRILLED TF WITH 0.5 BPM WHILE RIH THROUGH SHALES, STACK WEIGHTAT 11,860' THEN POP THROUGH. 12,195.00 PROD1 DRILL 4.25" LATERAL FROM 12,195' MD TO 18:30 - 22:00 3.50 DRILL P 12,340' MD - FREE SPIN: 2780 PSI ,3065PSI ON BOTTOM - RATE: 2.82 BPM IN, 2.79 BPM OUT. - MUD WEIGHT: 8.75 PPG IN, 8.83 PPG OUT, ECD:10.49 PPG - ROP: 40-125 FT/HR, WOB: 2-3.5 KLBS - BEGIN HOLDING 10.5 PPG ECD DURING DRILLING AND TRIPPING, AS PER ODE. AT 12,280' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. - SWEEPS BRING BACK 20% EXCESS CUTTINGS. - CONDUCT FREQUENT SHORT PICKUPS WHEN STACKING WEIGHT. P 22:00 - 22:15 0.25 DRILL 12,195.00 PROD1 DRILL 4.25"LATERAL FROM 12,340'MD TO 12,340' MD - FREE SPIN: 2,900 PSI - RATE: 2.79 BPM IN, 2.79 BPM OUT. - MUD WEIGHT: 8.79 PPG IN, 8.85 PPG OUT, ECD:10.60 PPG - ROP: 30-150 FT/HR, WOB: 2 - 3.5 KLBS - USE MPO CHOKE TO HOLD 10.5 PPG AT WINDOW. - CIRC PRESSURE: 3,120 PSI WHILE DRILLING - WHP: 220 PSI Printed 8/2/2017 4:06:37PM •AII depths reported in Drillers Depths' Printed 82/2017 4:06:37PM •AIL depths reported in Drillers Depths' North America - ALASKA - BP Page 7 of 12 Operation Summary Report Common Well Name: B-36 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 6/19/2017 End Date X3-018HL-0:(2,576,514.00) Project: Prudhoe Bay Site: PB B Pad Rig Name/No.: CDR -2 Spud DateTme: 4/30/1996 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USAOOOOOS26 Active datum: KB @76.91 usr (above Mean Sea Level) - Date From -To Him Task Code NPT Total Depth Phase Description of Operators (hr) Wit) 22:15 - 22:45 0.50 DRILL N 12,360.00 PRODt WEIGHT DRILLS OFF. TRY TO PICK UP AND CAN'T, DIFFERENTIALLY STUCK. GET LVT PUP INTO POSITION. RELAX HOLE, WORK PIPE 4 TIMES 10KTO 80K, NO MOVEMENT. SEEING TENSION ON DWOB, ABLE TO MOVE ORIENTER FREELY. CONDUCT PJSM THEN MIX SPACERS FOR LVT PILL. 22:45 - 00:00 1.25 DRILL N 12,360.00 PROD? PUMP 15 BBLS KCL SPACER, 20 BBLS LVT, THEN 15 BBLS KCL SPACER. WITH 10 BELS OIL OUT, WORK PIPE ONCE 10K TO 75K, NO MOVEMENT. SOAK FOR 10 MIN WITH 10K TENSION, COIL _ (POPS FREE. 624/2017 00:00 - 05:00 5.00 DRILL P 12,650.00 PROD1 I DRILL4.25" LATERAL FROM 12,360' MD TO 112,650' MD '- FREE SPIN: 2,900 PSI - RATE: 2.84 BPM IN, 2.81 BPM OUT. - MUD WEIGHT: 8.80 PPG IN, 8.86 PPG OUT, ECD: 10.60 PPG - ROP: 30-150 FT/HR, WOB: 2 - 3.5 KLBS - USE MPD CHOKE TO HOLD 10.5 PPG AT WINDOW. -CIRC PRESSURE: 3,100-3,300 PSI WHILE DRILLING - CONDUCT FREQUENT SHORT PICKUPS WHEN STACKING WEIGHT. 05:00 - 06:00 1.00 DRILL P 12,650.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW FROM 12,650'MD - RATE: 2.80 BPM IN, 2.58 BPM OUT. CIRC PRESSURE: 3,100 PSI - REDUCE PUMP RATEAND KEEPAS DRILLED TF PULLING THROUGH SHALES. - NO ISSUES ON TRIP - 1.5'CORRECTION WITH RA TAG ON WHIPSTOCK 0600 - 1200 600 DRILL P 12,808.00 PROD1 DRILL 4.25" LATERAL FROM 12,650'MD TO 12,808 MD - FREE SPIN: 2,980 PSI i- RATE: 2.84 BPM IN, 2.81 BPM OUT. - MUD WEIGHT: 8.80 PPG IN, 8.86 PPG OUT, ECD: 10.60 PPG - ROP: 30-150 FT/HR, WOB: 2 - 3.5 KLBS - USE MPD CHOKE TO HOLD 10.5 PPG AT WINDOW. - CIRC PRESSURE: 3,100-3,300 PSI WHILE DRILLING - CONDUCT FREQUENT SHORT PICKUPS WHEN STACKING WEIGHT DIFFICULT DRILLING DUE WEIGHT TRANSFER TO BIT Printed 82/2017 4:06:37PM •AIL depths reported in Drillers Depths' North America - ALASKA - BP Page 8 of 12 Operation Summary Report Common Well Name: 8-36 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 End Date: X3-018HL-C: (2,576,514.00) Project: Prudhoe Bay I Site: PB B Pad Rig NamerNo.: CDR-2 Spud Dat—T,— 4/30/1996 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000626 Active datum: KB @76.91 ush (above Mean Sea Level) Date From -To Him ! Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12:00 - 18:15 6.25 DRILL P 13,104.00 PRODt DRILL 4.25" LATERAL FROM 12,650'MD TO 13,104' MD - FREE SPIN: 2,980 PSI - RATE: 2.84 BPM IN, 2.81 BPM OUT. I- MUD WEIGHT: 8.80 PPG IN, 8.86 PPG OUT, ECD: 10.60 PPG -ROP: 30-150 FT/HR, WOB: 2-3.5 KLBS !- USE MPD CHOKE TO HOLD 10.5 PPG AT WINDOW. -CIRC PRESSURE: 3,100-3,300 PSI WHILE DRILLING �- CONDUCT FREQUENT SHORT PICKUPS WHEN STACKING WEIGHT -CLEAN PICKUPS, UP WT=52K, DOWN Wr= 13 - 14K. 18:15 - 18:30 0.25 DRILL P 13,104.00 PROD? WIPER TRIP TO WINDOW. ,- PULLING @ 35 FPM, SEE 15-20K OVERPULL @ 12,600' - SEE INDICATIONS OF STARTING TO PACK OFF, SLACK OFF TO NEUTRAL Wr. - SEE RETURNS OF 1:1. SLACK OFF AND UNABLE TO GO DOWN. - PULL UP (1) MORE TIME, NO GOOD W/ 17K OVERPULL. - SLACK OFF, NOTABLE TO GO DOWN. PREP TO PUMP MINERAL OIL. PROD? W/ 5-6K SLACKED OFF BELOW DOWN Wr, 18:30 - 21:00 2.50 DRILL N 13,104.00 (3.5K WOB), PUMP 15 BELS SPACER. - PUMPING @ 1.16 BPM / 1.14 BPM OUT. 3000 PSI PUMP PRESSURE. -MOTOR IS EITHER STALLED OR PACKED OFF. - FOLLOW W/ 20 BBLS MINERAL OILAND 15 BBLS SPACER. - WITH 10 BBLS LVT OUT, PUSH DOWN HARD AND BREAK FREE. -PULLING HEAVY WITH HIGH CIRC 'PRESSURE. RECIPROCATE PIPE AND CLEAN UP WELL. 21:00 - 00:00 3.00 DRILL P 13,104.00 PROD1 WIPER TO WINDOW. REDUCE PUMP RATE AND USE AS DRILLED TF THROUGH SHALE ZONES. SLIGHT DRAGGING SEEN, OTHERWISE CLEAN PASS TO WINDOW. PULL THROUGH WINDOW AND OPEN EDC, PUMP 3.9 BPM 13,600 PSI. PUMP 10 BBLS LO / HI VIS SWEEPS AROUND. PUMP SWEEPS UPATA HIGH RATE, DONT RETURN MUCH ADDITIONAL CUTTINGS. RIH BACK TO BOTTOM. PROD? CONTINUE WIPER TRIP BACK TO BOTTOM 825/2017 00:00 - 00:30 0.50 DRILL P 13,104.00 Printed 822017 4*06:37PM 'All depths reported in Drillers Depths' Printed 812/2017 4:06:37PM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 9 of 12 Operation Summary Report Common Well Name: 8-36 APE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 End Date: X3-018HL-C: (2,576,514.00) Project: Prudhoe Bay Site: PB _BPad Rig Name/No.: CDR -2 Spud DateTme: 4/30/1996 12:00:00AM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI. USA00000626 Active datum: KB ®76.91 usft (above Mean Sea Level) Date From -To Him Task Code NPT Total Depth Phase Description of Operators (hr) I(usft) 13,225.00 PROD? DRILL 4.25" LATERAL FROM 13,105' MD TO 0030 - 03:30 _I 3.00 - DRILL P 13,225' MD - FREE SPIN: 3,200 PSI - RATE: 2.78 BPM IN, 2.79 BPM OUT. - MUD WEIGHT: 8.80 PPG IN, 8.96 PPG OUT, ECD: 10.60 PPG - ROP: 30-150 FT/HR, WOB: 1 - 3.5 KLBS - USE MPD CHOKE TO HOLD 10.5 PPG AT WINDOW. - CIRC PRESSURE: 3,100 -3,500 PSI WHILE DRILLING - WEIGHT TRANSFER GETTING DIFFICULT, PUSHING UPHILL - FREQUENT PICKUPS FOR STACKING WEIGHT - PUMP 5 BBLS LO / HI VIS SWEEPS AROUND AT 13,225'. 03:30 - 09:15 5.75 DRILL P 13,470.00 PROD? DRILL 4.25" LATERAL FROM 13,225' MD TO 13,470' MD - FREE SPIN: 3,200 PSI - RATE: 2.80 BPM IN, 2.79 BPM OUT. - MUD WEIGHT: 8.84 PPG IN, 8.86 PPG OUT, ECD: 10.60 PPG - ROP: 10-50 FT/HR, WOB: 1 - 3.5 KLBS - USE MPD CHOKE TO HOLD 10.5 PPG AT WINDOW. - CIRC PRESSURE: 3,100.3,500 PSI WHILE 13,470.00 PROD1 DRILLING WIPER BACK TO WINDOW 09:15 - 11:00 1.75 DRILL P - RATE: 2.75 BPM IN, 2.78 BPM OUT. CIRC PRESSURE: 3,100 PSI - REDUCE PUMP RATEAND AS DRILLED TOOL FACE PULLING THROUGH SHALES. - NO ISSUES ON TRIP - 3.5' CORRECTION WITH RA TAG ON WHIPSTOCK 11:00 - 15:30 4.50 DRILL P 13,470.00 PROD? _ DRILL 4.25" LATERAL FROM 13,470' MD TO 13,503' MD - FREE SPIN: 3,120 PSI - RATE: 2.80 BPM IN, 2.80 BPM OUT. MUD WEIGHT: 8.84 PPG IN, 8.86 PPG OUT, ECD: 10.60 PPG - ROP: LESS THAN 5'/HR FT/HR, WOB: 1 -3.5 KLBS - USE MPD CHOKE TO HOLD 10.5 PPG AT WINDOW. -CIRC PRESSURE: 3,100-3,500 PSI WHILE DRILLING VERY LITTLE DIFFERENTIAL PRESSURE AND POOR EFFECTIVE WOB Printed 812/2017 4:06:37PM "All depths reported in Drillers Depths" Printed 8/2/2017 4:06 37PM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 10 of 12 Operation Summary Report Common Well Name: B-36 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 End Date: X3-018HL-C: (2,576,514.00) Pmjecl: Prudhoe Bay Site: PB B Pad Rig Name/No.: CDR -2 Spud DateTme: 4/30/1996 12:00:00AM Riq Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000826 Active datum: KB @76.91usft (above Mean Sea Level) Date From- To Hm Task Code NPT Total Depths Phase Description of Operations (hr) (usR) PROD1 POH 15:30 - 19:30 4.00 DRILL _ _ _ _ P 13,503.00 PUMP 5 BELS LO/ Al VIS SWEEPSAROUND. MONITOR WELL FOR 10 MINUTES: STATIC - MUD WEIGHT: 8.86 PPG IN, 8.91 PPG OUT - RATE: 2.8 BPM IN, 2.77 BPM OUT SWEEPS + B/U BRINGING BACK 20% EXCESS CUTTINGS. OPEN EDC - RATE: 3.51 BPM. CIRC PRESSURE: 3,350 PSI � IN 9.8 PPG KILL WEIGHT MUD FROM - LFROM OPEN HOLE TO SURFACE. 18:30 - 21:00 1.50 DRILL P 13,503.00 PROD? MONITOR WELL FOR 10 MINUTES AT BHA STATIC - CLOSE EDC, POWER DOWN - INJECTOR OFF: 20:00 - BIT IS 3-1. 21:00 - 21:30 0.50 BOPSUR P 13,503.00 PROD1 PJSM AND REVIEW PROCEDURE FOR FUNCTION TESTING BOPS. PERFORM WEEKLY FUNCTION TEST OF BOPS. RECORD CLOSING TIMES. 21:30 - 22:00 0.50 DRILL P 13,503.00 PRODt REPAIR SERVICE LOOP COVER. 22:00 - 00:00 2.00 DRILL P 13,503.00 PROD1 REPLACE FLOATS IN UOC. CHANGE OUT CT PACKOFFS. PRESSURE TEST FLOATS AND CT PACKOFFS, GOOD. 6/26/2017 00:00 - 02:00 2.00 DRILL P 13,503.00 PROD1 REMOVE INJECTOR. TAKE OFF NOZZLE. MAKE UP 4.25" DRILLING BHA #5 - PICK UP 2-7/8° ULS MOTOR (1.1 DEG AKO) AND 3° COI LTRAK TOOLS - MAKE UP 4.25 HYC BICENTER BIT WITH DURAFORCE CUTTERS - SURFACE TESTED COILTRACKAND AGITATOR TOOL. GOOD TEST. - PRESSURE TEST QTS TO 3,500 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 01:40 - WHILE MAKING UP BHA, CONDUCT KICK DRILL WITH COYNE CREW. - WELL IS SECURED IN ABOUT 1 MIN, WITH ALL PERSONNEL REPORTING TO ASSIGNED POSITIONS. _ -CONDUCTAAR. 02:00 - 05:30 3.50 DRILL P 13,503.00 PROD1 RIH WITH 4.25" DRILLING BHA #5 - RATE: 0.3 BPM IN, 0.56 BPM OUT. CIRC PRESSURE: 1,065 PSI - MUD WEIGHT: 8.86 PPG IN, 9.79 PPG OUT -DISPLACE CT TO DRILLING MUD AS RIH. - USE MPD CHOKE TO MAINTAIN 10.5 PPG AT THE WINDOW. - LOG DOWN FOR TIE-IN FROM 10,800' MO (FORMATION) WITH +8' CORRECTION - PARK ABOVE WINDOW AND CIRCULATE 9.8# I MUD OUT. Printed 8/2/2017 4:06 37PM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 11 of 12 Operation Summary Report Common Well Name: 8-36 APE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 End Date- X3-018HL-C: (2,576,514.00) Project: Prudhoe Bay Site: PB B Pad Rig Name/No.: CDR -2 Spud Daterrime: 413011996 12:00:OOAM Rig Release: Rig Contractor. NABORSALASKA DRILLING INC. BPUOI: USA00000628 Active datum: KB @76.91 usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Desorption of Operations (hr) i (usft) 05:30 - 06:45 125 DRILL P 13,503.00 PROD? RIH WITH 4.25° DRILLING BHA N6 FROM 11,550' MO TO 13503' MO - RATE:.35 BPM IN, .35BPM OUT. CIRC PRESSURE: 1770 PSI - MUD WEIGHT: 8.95 PPG IN, 8.99 PPG OUT NO ISSUES RIH THROUGH SHALES 0845 - 1500 8.25 DRILL P 13,695.00 PROD? DRILL 4.75" LATERAL FROM 13503' MD TO 13695' MD (8787' TVD) - FREE SPIN: 3635 PSI, 2.70 BPM - RATE: 2.8 BPM IN, 2.8 BPM OUT. CIRC PRESSURE: 38504110 PSI �I- MUD WEIGHT: 8.9 PPG IN, 8.9 PPG OUT, ECD: 10.85 PPG :-ROP: 5-35 FT/HR, WOB: 1.2-2.5 KLBS TOOK 2.8 BPM BEFORE SEEING POSITIVE AGITATOR MOVEMENT _ 15:00 - 16:00 1.00 DRILL P 13,695.00 PRODt PUMP HIGH/LOW SWEEPS SEEN ANNULAR PRESSURE INCREASING (11.6 ECD) BEFORE SWEEPS EXIT, HOLE STARTED TAKING FLUID 2.8 BPM LOSS RATE = 0.75 BPM /45 BPH SLOWED PUMP TO 2 BPM LOSS RATE AT 0.5 BPM 30 BPH -NOTIFIED WSUP OF LOSSES OF 30 BPH j MUD WT IN 8.88 IN 8.82 OUT 2700 PSI 13,695.00 PROD? WIPER HOLE BACK TO WINDOW 1600 - 1730 1.50 DRILL P PUMP 2 BPM EXCEPT THROUGH SHALE SECTION LOSS RATE A 2 BPM IS STILL 0.5 BPM 2 BPM 1770 PSI. HANGING UP AT WINDOW, WORK CT UP AND DOWN TO GET THROUGH. STILL DRAGGING AFTER PULLING THROUGH WINDOW. PICK UP AND WORK PIPE TO CLEAN UP WELL. 17'.30 - 2120 3.83 DRILL P 13,695.00 PROD1 OPEN EDC, WIPER TO SURFACE. GETTING 30 BBL/HR LOSS RATE NEAR WNDOW, GRADUALLY IMPROVING AS THE CT IS PULLED UPHOLE. NEAR WINDOW 2.0 / 1.23 BPM AT 50 FT/MIN. AT 9,000 FT 2.68 / 2.20 BPM AT 50 FT/MIN. PUMPS BBLS LO/ HI SWEEPS AROUND. AT 8,400 FT 3.33 / 2.91 BPM AT 50 FT/MIN. MW: 8.85 / 8.85 PPG IN / OUT. USE MPD CHOKE TO HOLD 10.1 PPG AT THE WINDOW. 21:20 - 00:00 2.67 DRILL P 13,695.00 PROD1 RIH BACKTO WINDOW. PUMP 1 BPM, HOLD 10.1 PPG AT THE WINDOW. TIE-IN DEPTH AT FORMATION, CORRECT -8 FT. PASS THROUGH WINDOW WITH NO ISSUES, RIH TO BOTTOM. Printed 81212017 4.06:37PM •AII depths reported in Drillers Depths' North America - ALASKA - BP Page 12 of 12 Operation Summary Report Common Nkll Name: B-36 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/19/2017 Eno Date: X3-018HL-C: (2,576,514.00) Project Prudhoe Bay Site: PB B Pad Rig Name/No.: CDR -2 Spud Daterhme: 4/30/1996 12:00:OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00000626 Active datum: KB @76.91 usft (above Mean Sea Level) Date From -To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usR) PROD1 CONTINUE RIH. 6/27/2017 00:00 - 01:45 1.75 DRILL P ! 13,702.00 PAST THE LAST BIG SHALE ZONE START BEAD PILL IN 9.88 MUD DOWN THE CT. CLEAN PASS TO BOTTOM. TAG AT 13,707, CORRECTED DRILLED DEPTH. PERFORM DYNAMIC FLOW CHECK NEAR BOTTOM, ON LOSSES. 01:45 - 05:45 4.00 DRILL P 13,702.00 PROD1 BEADS OUT THE BIT, POOH LAY IN BEAD PILL IN 9.8# MUD UP TO WINDOW. CLEAN PASS TO WINDOW, SLIGHT OVERPULL ONCE AT 11,870'. PULL THROUGH WINDOWAND PERFORM 100 SFT JOG, OPEN EDC. JET WHIPSTOCK TRAY. POOH WHILE CIRCULATING IN HEAVY MUD. - MUD WEIGHT: 9.80 PPG IN, 8.89 PPG OUT - RATE: 1.96 BPM IN, 1.92 BPM OUT - CIRC PRESSURE: 1,810 PSI - FLAG PIPE WHILE POOH. 0545 - 0700 1.25 DRILL P 13,702.00 PROD- LAYDOWN BHA - INJECTOR OFF @ 05:45 HRS. -INSPECT COILABOVE CONNECTOR P 13,702.00 07:00 - 08:00 1 00 DRILL PROD1 CLEAR FLOOR AND LAY OUT BHA. - BIT GRADED 1-2. Printed 8/2/2017 4.06:37PM 'Ail depths reported in Drillers Depths' North America - ALASKA - BP Paget of 9 Operation Summary Report Common Well Name: B-36 AFE No Event Type: COM- ONSHORE (CON) Start Date: 6/2712017 End Date: X3-018HL-C: (1,055,885.00) Project: Prudhoe BayI Site: PB B Pad Rig Name/No.: CDR -2 Spud Datelrme: 4/30/1996 12:00:OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUO I: USA00000626 Active datum: KB @76.91usft (above Mean Sea Level) Date From - To Hire Task Code NPT Total Depth Phase Description of Operations _ hr Waft) 6/27/2017 08:00 - 12:00 4.00 RIGU P 13,702.00 RUNPRD PJSM. CUT OFF 100' OF 2 3/8", 4.41 PPF COIL. - RE HEAD. PULL TEST 50K AND PRESSURE TEST @ 4500 PSI, OK. RUNPRD PJSM. PICK UP (2) JTS OF 2 3/8" PH -6 TUBING 12:00 - 13:30 1.50 RIGU P 13,702.00 AND WU TO COIL. - PUMP SLACK FORWARD. BREAK OFFAND CUT 334' OF 5116'E LINE. -REBOOT. RUNPRD PJSM. PUMP 3/4"BALLAROUND. 13:30 - 15:30 2.00 RIGU P 13,702.00 - PUMP 90 BBLS AT 4 BPM..., DID NOT HEAR BALL GO OVER GOOSENECK - RECOVERED BALLAND BOOT, RE BOOT 15:30 - 16:00 0.50 RIGU P 13,702.00 ELINE. RUNPRD REVIEWED PROCEDURE FOR RUNNING LINER. - REVIEWED RISKS AND CORRESPONDING MITIGATIONS. - TABLE TOP DRILL ON SHUTTING IN THE WELL WHILE RUNNING LINER. - DISCUSSED HOW WE RESPOND TO H2S ALARMS GOING OFF WHILE SHUTTING IN WELL. - GOOD DISCUSSION WITH CREW AND TOOL PUSHER PRESENT. 16:00 - 19:00 3.00 RIGU P 13,702.00 RUNPRD RUN 2-716'x 3-11N'x 31/1' 13CR85 LINER TO 2,803'MD -FILL PIPE EVERY 10 JTS RUNPRD CONTINUE MAKING UP LINER. 19:00 - 19:30 0.50 RIGU P 13,702.00 OCCASIONAL LEL READINGS NOTED (4 - 8%) FROM SENSORS ON SHAKER, CHOKE, AND RIG FLOOR. READINGS NOT HIGH ENOUGH TO ACTIVATE ANY ALARMS. STOP AND CHECK THESE AREAS WITH HANDHELD MONITOR, SHOWING ZEROS ALL AREAS. VERIFY NO -FLOW FROM WELL, TRIP SHEET IS -1 BBLS SINCE THE START OF MAKING UP LINER. CALL NABORS ELECTRICIAN OUT TO TROUBLESHOOT SENSORS. NOTIFY WSUP OF LEL READINGS. 19:30 - 20:00 0.50 RIGU N 13,702.00 RUNPRD ELECRICIAN ON LOCATION. STOP OPERATIONS AND INSTALL SAFETY JOINTAND TORQUE IT UP WHILE ELECTRICIAN CALIBRATES ALL SENSORS. CONTINUE TO MONITOR FLUID LEVEL IN WELL, NO BUBBLING, STATIC FLUID LEVEL. MONITOR SHAKER AND RIG FLOOR WITH HANDHELD GAS DETECTOR FOR THE REST OF THE LINER JOB. 20:00 - 00:00 4.00 RIGU P 13,702.00 RUNPRD LAY DOWN SAFETY JOINT, CONTINUE MAKING UP LINERAS PER LINER SUMMARY. NO MORE LEL READINGSAFTER CALIBRATION. Printed 8/2/2077 4:06:04PM •Ai depths reported in Drillers Depths' North America - ALASKA - BP Page 2 of 9 Operation Summary Report Common Well Name: B-36 AFE No Event Type: COM- ONSHORE (CON) Start Date: 6/27/2017 End Date: X3 -0181-11--C: (1,055,885.00 ) Project: Prudhoe Bay I Site: PS B Pad Rig Name/No.: CDR -2 Spud Date/Time: 4/30/1996 12:00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000626 Active datum: KB (876.91 usft (above Mean Sea Level) Data From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 6/28/2017 00:00 - 03:45 3.75 RIGU P 13,702.00 RUNPRD CONTINUE MAKE UP LINER AND RUNNING TOOLS, FILL EVERY 10 JTS. RUN LINER ON COIL - PRESSURE TEST OTS TO 3,500 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 03:40 RUNPRD RIH WITH 2-7/8"X3-1/4"X3-1/2"COMPLETION 03:45 - 07:00 3.25 RUNCOM P 13,702.00 BHA - RUN DOWN WITH 15-16 K SLACK OFF WEIGHT PUMPING AT.3 BPM, 1150-1370 PSI - VERY SLIGHT LOSSES DURING RIH - MW IN AND OUT 9.84 PPG - CIRC DOWN BEADS PER PRESCRIBED PLAN FORWARD - PICK UP WEIGHTAT WINDOW WITH PUMPS OFF 74K INITIAL. PICKUPAND BRING ON PUMPS, JOG 1 000'TO GET BEADS DOWN ANDAROUND. PICKUP GOOD AT 68-70K MOVE DOWN, SLACK OFF WEIGHT OF 16K. PICK UP WEIGHT AT WINDOW OF 65K WITH PUMPS ON AT .5 BPM. 07:00 - 08:15 1.25 RUNCOM P 13,702.00 RUNPRD MOVE THROUGH WINDOWAND RUN DOWN INTO OPEN HOLE - MUD WEIGHT: 9.82 PPG IN, 9.82 PPG OUT - RATE .54 BPM IN, .72 BPM OUT AND CIRC PRESSURE OF AVERAGE 1300 PSI - MUD LOSSES WHILE RIH MINIMAL - TAG UP AT 12,658'. COINCIDES WITH BEGINNING OF SHALE SECTION FROM 12,670' TO 12,870'. 08:15 - 13:30 5.25 RUNCOM N 13,702.00 RUNPRD WORK LINER ASSEMBLY DOWN FROM 12,658' - PUW WHILE WORKING 65-71K, SOW FALLING TO LOW AS -3K - DIFFICULT TO MAKE ANY PROGRESS PAST ,12,850'. CYCLE PIPE 30 TIMES IN THIS AREA. PUMP DOWN 40 BBL FRESH 9.8 PPG MUD PILL WITH FULL LUBES IN ATTEMPT TO WORK DOWN LAST 20' THROUGH SHALE. - CIRC RATE OF .65-.72 BPM, 1375-1480 PSI. - MADE PROGRESS UP TO 12,889' WHILE CIRCULATING DOWN FRESH MUD PILL MADE SHORT WIPER UP TO 12,800', VERY DIFFICULT TO MOVE BACK DOWN. FRESH MUD PILL HELPED GET BHA BACK DOWN TO 12,867'. CANNOT MAKE PROGRESS. DISCUSS WITH ODEAND TOWN TEAM. Pnnted 8/2/2017 4:06:04PM `All depths reported in Drillers Depths' North America - ALASKA - BP Page 3 of 9 Operation Summary Report Common Well Name: B-36 AFE No Event Type: COM- ONSHORE (CON) Start Date: 6/27/2017 End Date: X3-018HL-C: (1,055,885.00) Project: Prudhoe Bay Site: PB B Pad Rig Name/No.: CDR -2 Spud Daternme: 4/30/1996 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00000826 Active datum: KB Q78.91 usft (above Mean Sea Level) Date From- To Hrs Task Code NPT Total Depth Phase Description of Operations (h0 (usft) 13:30 - 18:00 4.50 RUNCOM N 13,702.00 RUNPRD ATTEMPTTO USE DRILLING ECD OF 10.5 PPG TO INHIBIT SHALE WITH NO MOVEMENT. WORK PIPE THROUGH INTERVAL, PUW INCREASED TOAS HIGH AS 90K (-20K OVER). SEEMS TO BE DEFINITE LEDGE AT 12,867'. - INCREASING SYSTEM LUBRICANT LEVELTO 4% OVER TIME. MOBILIZE IN MINERAL OIL AND PREPARE SPACER. - RECORDING 6-7 BPH LOSSES WITH INCREASED PRESSURE AND NO MOVEMENT. DECIDE TO STOP USING INFLUENCED ECD. LOSSES STOPPED IMMEDIATELY. - MAKE ATTEMPTS TO MOVE PIPE BUT HAVING HEAVY PICKUPS AT 12,848' AND CANNOT PULLABOVE THAT. CIRCULATING AT .52 BPM IN, .47 BPM OUT, 1400 PSI. - PUMP DOWN SPACER - MINERAL OIL - SPACER COMBO FOLLOWED BY HIGHER LUBE CONCENTRATION 9.8 PPG MUD SYSTEM. CIRCULATE DOWN AT.96BPM, 1625 PSI. - CONTINUE MAKING EFFORTS TO MOVE DOWN WHILE PUMPING DOWN MINERAL OIL; ATTRIBUTE INITIAL MOVEMENT TO HIGHER CIRC RATES. MOVE TO 12,902'. - SLOW CIRCULATION RATES DUE TO PRESSURE LIMITATIONS. PUMP RATES VARYING FROM.01 BPM TO.22 BPM AT 1670-1780 PSI. STILL ABLE TO MOVE PIPE AND MAKING FORWARD PROGRESS. MOVING PIPE IN SLOW INCREMENTS BUT MAKING PROGRESS. PICKUP WEIGHTS FAIRLY HEAVY, RANGING FROM 65-94K. 118:00 - 2100 3.00 RUNCOM N 13,702.00 RUNPRD WORK PIPE TO 13,040', NO FURTHER PROGRESS. ! CONTINUE CIRCULATING MINERAL OIL TO SHOE. TRY WORKING PAST 13,040' PERIODICALLY. CIRCULATE 0.50 BPM / 1,750 PSI. ABLE TO GET TO 1 BPM / 1,750 JUST BEFORE OIL EXITS SHOE. WITH 3 BBLS OIL OUT GO TO 0.25 BPM, START WORKING PIPE DOWN. ABLE TO WORK DOWN PAST 13,2001. LOTS OF CUTTINGS COMING BACK. WORK DOWN TO 13,260'. WITH ALL OIL OUT PARK AT 13,246' AND CIRCULATE. USE MPD CHOKE TO APPLY 250 PSI WHP WHILE LVT IS CIRCULATED OUT. CONTINUE CIRCULATING 1.18 11 As BPM AT 1,830 PSI 'WITH 230 PSI WHP. Printed 82/2017 4:06:04PM 'AII depths reported in Drillers Depths' North America - ALASKA - BP Page 4 of 9 Operation Summary Report Common Well Nacre: B-36 AFE No Event Type: COM- ONSHORE (CON) Start Date: 5/27/2017 End Date: X3-018HL-C: (1,055,885.00) Project: Prudhoe Bay Site: PB B Pad Rig Name/No.: CDR -2 Spud Daterrme: 4/30/1996 12:00:OOAM Rig Release: Rig Contracts: NABORS ALASKA DRILLING INC. BPUOI: SSA00000626 Active datum: KB @76.91usit(above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) Wait) 21:00 - 23:00 2.00 RUNCOM N 13,702.00 RUNPRD WITH LVT INTERFACE BACK TO SURFACE, NO INCREASE IN VISCOSITY NOTED. FUNNEL VIS OF INTERFACE IS 57 SEC, NORMAL MUD IS 55 SEC. STILL GETTING GOOD AMOUNT OF CUTTINGS BACK, MOSTLY BEADS AT THIS POINT ACCORDING TO GEO. WITH LVT OUT OPEN MPD CHOKE, GETTING 1,G4 10,11 BPM AT 1,800 PSI, CONTINUE TRYING TO WORK PIPE PERIODICALLY, NO PROGRESS. PARKAT 13,243' AND DISCUSS WITH ODE TO PUMP ANOTHER MINERAL OIL PILL. CONTINUE WORKING PIPE PERIODICALLY, NO PROGRESS PAST 13,242'. 13,702.00 RUNPRD PUMP 15 BBLS 6% KCLVIS BRINE WITH NO 23:00 - 00:00 1.00 RUNCOM N LUBES SPACER, 20 BBLS LVT, 15 BBLS 6% KCL VIS BRINE WITH NO LUBES. PUMP 0.92 / 0.90 BPM AT 1,700 PSI. REDUCE PUMP AS NEEDED TO STAY BELOW 1,900 PSI. 6/29/2017 00:00 - 01:30 1.50 RUNCOM N 13,702.00 RUNPRD CONTINUE CIRCULATING LVT TO SHOE. SLOWLY INCREASE RATE KEEPING PUMP PRESSURE < 1,900 PSI. 01:30 - 02:15 0.75 RUNCOM N 13,702.00 RUNPRD 5 BBLS LVT OUT, START WORKING PIPE. WORK PIPE DOWN TO 13,265' CAN'T PASS THIS SPOT. REVIEW COILLIFE, ABOUT 28% NOW IN THIS AREA. TRY VARIOUS RUNNING SPEEDS, PUMPS ON, PUMPS OFF, DIFFERENT WHP. UNABLE TO PASS 13,265'. TRY LETTING LVT SOAK, NO PROGRESS. PICK UP 60 FT AND TRY TO RIH FAST, LOSING HOLE. WORK BACK DOWN TO 13,237'. 02:15 - 04:15 2.00 RUNCOM N 13,702.00 RUNPRD PUMP REMAINING LVT OUT, LET SOAK. PUT 300 PSI ON WHP. AFTER 15 MIN PUSH DOWN TO 13,256'. AFTER 10 MIN PICK UPAND PUSH DOWN TO 13,263'. WAIT AND PUSH DOWN 7013,277'. KEEP 300 PSI ON WHP. AFTER 10 MIN PICKUPAND PUSH DOWN TO 13,288'. WAIT S70 MIN EACH TIME THEN WORK PIPE DOWN. TRY PUMPS ON AND OFF EACH TIME. ABLE TO WORK DOWN TO 13,294'. Printed 8/2/2017 4:06:04PM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 5 of 9 Operation Summary Report Common Well Name: B-36 AFE No Event Type: COM- ONSHORE (CON) Start Date: 6/27/2017 End Date: X3-018HL-C: (1,055,885.00) Project: Pmdhoe Bay Site: PB B Pad Rig Name/No.: CDR -2 Spud Date/rime: 4/30/1996 12:00:OOAM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00000626 Active datum: KB Q76.91usft (above Mean Sea Level) Date From- To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) RUNPRD CONTINUE WORKING PIPE DOWN 04:15 - 14:45 10.50 RUNCOM N 13,702.00 - WORK PIPE WHILE MINERAL OIL PILL IS BEING CIRCULATED OUT OF WELLBORE - MAKING INCONSISTENT BUT STEADY PROGRESS USING VARYING PUMP RATES AND SHORT PICKUPS - LOSING ALL RETURNS AT ANYTHING LESS THAN 1.1 BPM. FLUID LEVEL ISAT MUD CROSS; SOON AS RATE IS BROUGHT TO 1.2 BPM RETURNS AT SHAKER. COMBINATION OF LOWER PUMP RATES AND SHORT PICKUPS SEEM TO HELP MOVEMENT PROGRESS. - PICKUP WEIGHTS BETWEEN 72 KAND 91K, MOSTAVERAGING MID 80 K - PUMP TWO ITERATIONS OF BEADS DOWN ONE HOUR APART TO SEE IF IT WILL HELP WITH SLOWING LOSSES/ INCREASE PIPE MOVEMENT BUT DID NOT SEEM TO HELP. -TD FLAG 2' OFF, BHA IS ON DEPTH -CONDUCTED VAPOR TEST ON DEAD CRUDE AS CONTINGENCY, VAPOR PRESSURE TOLERANCE GOOD AT .9 PSI - HAVING DIFFICULTY GETTING PAST 13,444' 14:45 - 17:30 2.75 RUNCOM N 13,702.00 RUNPRD CIRCULATE DOWN 15 BBL KCL SPACER PILL - 18 BBLS LV!- 15 BBL KCL SPACER PILL AT INITIAL RATE 1.38 BPM, 1820 PSI. - RATE AS LOW AS A BPM DUE TO PRESSURE LIMITATIONS BUT MOST CIRCULATION DOWN AT .6-.7 BPM IN, .1-.15 BPM OUT, 1680-1880 PSI - CONTINUING WITH EFFORT TO MOVE TO BOTTOM WHILE CIRCULATING AND MOVING FORWARD WITH VERY SMALL BITES RUNPRD CONTINUE WORKING PIPE DOWN TO 13,489' 1730 - 1830 1.00 RUNCOM N 13,702.00 RETURNS HAVE GONEAWAY, LINE UP TO FILL THE WELLACROSS THE TOP, FILL WITH 1 BBL. LET LVT SOAKAWHILE AND KEEP WORKING PIPE. 18:30 - 20:00 1.50 RUNCOM N 13,702.00 RUNPRD APPLY 200 PSI WHP FROM THE TOP. CONTINUE WORKING PIPE DOWN TO 13,523'. PUMP 1 - 2 BBLS LVT OUT PERIODICALLY, LEAVE WELL SHUT IN. WORK PIPE DOWN TO 13,522'. 13,702.00 RUNPRD PUMP I MORE BBL LVT OUTAND LET SOAK 20:00 - 21:20 1.33 RUNCOM N WORK DOWN TO 13,567', PUMP 1 MORE BBL OUTAND LET SOAK WORK PIPE DOWN TO 13,575'. KEEP 200 PSI ON WHP. WORK PIPE DOWN TO 13,597'. 13,702 00 RUNPRD CONTINUE WORKING PIPE WITH THE CHOKE 21:20 - 23:00 1.67 RUNCOM N CLOSED. PICK UP JUST TO BREAKOVER EACH TIME AND RIH QUICKLY. WORK PIPE DOWN TO 13,612'. PUMP 1 MORE BBLS OF LV OUT AND APPLY 200 PSI WHP, LET SOAK. CONTINUE WORKING PIPE DOWN TO 13,660'. Pnnted 8/2/2017 4*06:04PM 'All depths reported in Drillers Depths' Printed 82/2017 4:06:04PM `All depths reported in Drillers Depths' North America - ALASKA - BP Page 6 of 9 Operation Summary Report Common Well Name: B-36 AFE No Event Type: COM- ONSHORE (CON) Start Date:6272017 End Date. X3-018HL-C: (1,055,88&00) Project: Prudhoe Bay Site: PB B Pad Rig Name/No.: CDR -2 Spud DateMme: 4/30/1996 12:00:00AM 1 Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. I BPUO1: USA00000626 Active datum: KB Q76.91 usft (above Mean Sea Level) Date From - To Hire Task Code NPT Total Depth Phase Description of Operators (hr) (usft) 23:00 - 00:00 1.00 RUNCOM N 13,702.00 RUNPRD OPEN CHOKE AND CIRCULATE, GET GOOD CIRCULATION INITIALLY THEN RETURNS FALLING OFF. CIRCULATE 0.8 / 0.2 BPM OUT TO TIGER TANK, LVT INTERFACE MAY BE COMING 1 BACK. TRY WORKING PIPE WHILE CIRCULATING, LOSE 5 FT BACK TO 13,655'. CLOSE CHOKE BACK IN AND PUT 200 PSI WHIP ABLE TO WORK DOWN TO 13,680'. 6/30/2017 00:00 - 01:00 1.00 RUNCOM P 13,702.00 RUNPRD WORK DOWN TO 13,680' NO FURTHER ,PROGRESS. HAVE HIT THIS SPOTABOUT 10 TIMES. CONSIDER THIS DEPTH TD. UNCORRECTED TO AT 13,689. PERFORM 3PICKUPS HERE, EACH AT 35 FT/MIN. BREAKOVER IS 68K, 68K, 70K, EACH TIME WITH THE SAME STRETCH. 01:00 - 02:30 1.50 RUNCOM P 13,702.00 RUNPRD PUMP 5/8" STEEL BALLAROUND AT 1.96/0.21 BPM. CIRC PRESSURE IS 2,560 PSI. BALL IS NOT HEARD ROLLING. AFTER 29 BBLS AWAY LAUNCH AGAIN WITH 1 3,000 PSI, SLOW PUMP TO 0.75 BPM AFTER 35 BBLS AWAY. AFTER 70 BBLS AWAY, NO SIGN OF BALL. TRY CYCLING REELAND PUMP, NO LUCK. 02:30 - 03:00 0.50 RUNCOM P 13,702.00 RUNPRD RE -LAUNCH WITH 2,500 PSI. BALL ON SEAT AT 115 BBLS AWAY, PRESSURE UP TO 4,500 PSI TO SHEAR OUT RUNNING TOOL, PERFORM 2 PICKUPS, EACH AT 35 FT/MIN. BREAKOVER IS 54K, 56K, EACH TIME WITH THE SAME STRETCH. SET BACK DOWN 1 OK ON THE TOOL. Printed 82/2017 4:06:04PM `All depths reported in Drillers Depths' North America - ALASKA - BP Page 7 of 9 Operation Summary Report Common Well Name: B36 AFE No Event Type: COM- ONSHORE (CON) Start Date: 6/27/2017 End Date: X3-018HL-C: (1,055,885.00) Project: Prudhoe Bay Site: PB B Pad Rig Name/No.: CDR -2 Spud DateRme: 4/30/1996 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. _ SPUOI: USA00000626 Active datum: KB @76.91 usR (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operators (hr) _ _ CEMT (usil) 03:00 - 10:00 7.00 P 13,702.00 RUNPRD SWAP WELL TO 8.4 PPG 1%KCL. AFTER KCL REACHES SHOE, RETURNS ARE LOST. LINE UP TO DISPLACE MUD IN ANNULUS BY BULLHEADING KCL. BULLHEAD 140 BBLS 8.4 PPG KCL DOWN BACKSIDE AT INITIAL RATE OF i BPM / 1,350 PSI. -PRESSURES DROPPING AS HEAVIER FLUID IS BULLHEADED INTO FORMATION. CIRCULATION PRESSURE DOWN TO 920 PSI AS 8.4 PPG KCL IS EXITING WINDOW ON BACKSIDE. - LINE UP CIRCULATION PATH DOWN COIL WITH RETURNS NORMAL WAY. BRING ON PUMPS SLOWLY TO BREAK CIRCULATION. BRING PUMPS UP TO 1.35 BPM, 495 PSI, WITH 1.15 BPM RETURNS. CONTINUE INCREASING PUMP RATE UP TO 1.45 BPM WITH 1.27 BPM RETURNS. - FINAL CIRCULATION RATE WITH 8.4 PPB 1% KCLAROUND AT 2.25 BPM, 1340 PSI, WITH RETURNS AVERAGING 1.70 BPM. LOSS RATE ESTABLISHED ATAVERAGE OF 28 BPH. -CONTINUE WITH CIRCULATION WHILE CEMENTERS LINE UP FOR PRESSURE TESTING LINES, CONDUCT PRESSURE CROSSCHECK DISCUSSION WITH SL8 CEMENTING CREW FOR PRESSURE TESTING LINES. PRESSURE TEST CEMENT LINES UP TO INNER REEL VALVE TO 250 PSI LOW/ 4700 PSI HIGH. - CIRCULATE WHILE CREWS CONDUCT 'CHANGEOUT. CONDUCT PJSM FOR CEMENT JOB. REVEIW PRESSURE CROSSCHECK, VALVE ALIGNMENTS, PERSONNEL ASSIGNMENTS. Printed 8/2/2017 4:06:04PM *All depths reported in Drillers Depths' Printed 8/212017 4:06:04PM •AII depths reported in Drillers Depths' North America - ALASKA - BP Page 8 of 9 Operation Summary Report Common Well Name: B-36 AFE No Event Type: COM- ONSHORE (CON) Start Date: 6/272017 End Date. X3-018HL-C: (1,055,885.00) Project: Prudhoe Bay Site: PB 8 Pad Rig Name/No.: CDR-2 Spud Data/Tme: 4/30/1996 12:00:OOAM Rig Release: Rig Contractor NABORS ALASKA DRILLING INC. BPUOI: USA00000626 Active datum: KB @76.91 usft (above Mean Sea Levey Date From -To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 10:00 - 12:15 2.25 CEMT P 13,702.00 RUNPRD MIX AND PUMP 37 BBLS OF CEMENT: -CEMENT WETAT 1015 HRS. I -ZERO IN MM ONCE DENSITY =13.5 PPG - LOAD 31.9 BBLS 15.3 PPG CEMENT IN REEL - SWAP TO RIG PUMP. CLEANUP LINES TO SLB UNIT. PERFORM DISPLACEMENT WITH RIG PUMPS - DISPLACE CEMENT WITH 8.4 PPG EXHAUST PILL - RATE: 1.95 BPM IN, 1.65 BPM OUT LAUNCH PEE WEE DART AND LINER WIPER j PLUG AS FOLLOWS: - PICK UP TO BREAKOVER+13 FT (13,653' MD) PER BTT REP, EXPOSE DOGS, SET DOWN AT 13,670' MD (10 FT HIGHER) - PU: 60 KLBS, SO: 11 KLBS, SET DOWN 10K TO 1 K ON AT INDICATOR. - SHIFT LINER WIPER PLUG DOWN, PICK BACK UP TO 13,655' MD AND SIDE EXHAUST 5 BBLS - SET DOWN 1OK AT 13,670' MD AND LAUNCH PEE WEE DART. - PRESSURE UP ON WIPER PLUG AND ZERO MM. - LINER WIPER PLUG SHEARED AT 4100 PSI (3 BBLS TO SHEAR), DISPLACE LINER WIPER PLUG - DISPLACE AT 1.95 BPM, 2400-2700 PSI - PLUG BUMPED AT 18.6 BBLS, 3460 PSI (18.6 BBLS CALCULATED) - OPEN BLEEDER AND CHECK FLOATS. GOOD TEST. - PRESSURE UP TO 800 PSI ON COIL, PICK UP AND CONFIRM PRESSURE DROP - CEMENT IN PLACE: 1207 HRS - 24 BBLS CEMENT BEHIND PIPE, BASED ON MANUALSTRAP. i- TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE: 6 BBLS _ 12.15 - 15:00 2.75 CEMT P 13,702.00 RUNPRD PJSM. POOH W/ COILAND LINER RUNNING ASSEMBLY. - POOH @ 100 FPM / PUMPING 2.9 BPM 1125 PSI. - GOOD INDICATION OF CEMENT RETURNS BOTH FROM SIDE EXHAUST AND AFTER BUMPING PLUG AND STINGING OUT PRIOR TO POOH. - - POOH TO 2520'. 15:00 - 16:15 1.25 DISPL P 13,702.00 POST PJSM W/ LITTLE RED. - RIG UP LITTLE RED AND CHECK VALVE ALIGNMENT. - REVIEWED NABORS PROCEDURE AND PRESSURE CROSS CHECK LIST. - PUMP (40) BBLS DIESEL DOWN COIL @ 2 BPM W/ LITTLE RED. 16:15 - 1730 125 DISPL P 13,702.00 POST PJSM. POOH LAYING IN DIESEL FREEZE PROTECT. Printed 8/212017 4:06:04PM •AII depths reported in Drillers Depths' North America - ALASKA - BP Page 9 of 9 Operation Summary Report Common Well Name: 8-36 AFE No Event Type: COM- ONSHORE (CON) Start Date: 6/27/2017 End Date: X3-018HL-C: (1,055,885.00) I Project: Prudhoe Bay Site: PB B Pad Rig Name/No.: CDR -2 Spud Date/time: 4/30/1996 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUDI: USA00000626 Active datum: KB 076.91 usft (above Mean Sea Level) Data From -To Hrs Task Code NPT Total Depth Phase Description of Operations _ (hr) 2.00 DISPL (usft) 17:30 - 19:30 P 13,702.00 RUNPRD I MONITOR WELL FOR 10 MIN AT BHA, STATIC. LAY DOWN PH6 AND 7 JTS OF DRILL COLLARS. LAY DOWN SELRT RUNNING TOOLS, RECOVER 5/8" BALL. CLOSE MASTER VALVE. 19:30 - 21:00 1.50 DISPL P 13,702.00 POST _ PJSM WITH HES N2 CREW AND RIG CREW FOR PUMPING NITROGEN. INSTALL NOZZLE, MAKE UP TO WELL. PUMP FRESH WATER AND MEOH AHEAD OF THE N2. COOL DOWN N2 UNIT. WSLAND N2 SUPERVISOR PERFORM PRESSURE XCHECK VERIFICCATION PRIOR TO PT OF LINES. P 13,702.00 POST PURGE REEL WITH N2. 21:00 - 0000 3.00 DISPL PUMP 2,000 SCFM FOR 15 MIN. ALLOW PRESSURE TO BLEED OFF, PURGE SURFACE LINES. GREASE PLUG VALVES THAT SAW NITROGEN. _ _ PREP TO REMOVE IRON FROM REEL POST _ PERFORM LEAK TIGHT TEST ON SWAB AND 7/1/2017 00:00 - 0300 3.00 DISPL P 13,702.00 MASTER VALVES TO PREPARE FOR REMOVING BOPS. REMOVE 1502 IRON FROM INSIDE REEL. REMOVE COUNTERS FROM INJECTORAND REEL. INSTALL CT GRAPPLE. CONDUCT PJSM FOR UNSTABBING CT. 03:00 - 07:30 4.50 DISPL P 13,702.00 POST UNSTAB PIPE FROM INJECTOR, ROLL IT BACK TO REELAND SECURE ITATTHE REEL. 07:30 - 08:30 1.00 DISPL P 13,702.00 POST CONTINUE TO CLEAN PITS AND PREP FOR NIPPLE DOWN. 08:30 - 10:00 1.50 DISPL P 13,702.00 POST PJSM. NIPPLE DOWN DOPE. - FILLTREE W/ DIESEL, N/U TREE CAP. - LEAK TIGHT TEST ON TREE CAP AGAINST SWAB. - PT 250 / 3500 PSI, OK - SECURE WELL RIG RELEASED @ 10:00 HRS. - ALL FURTHER ENTRIES FOR TODAY ON THE 2017 COR2 MAINTENANCE REPORT. THE RIG WILL STOP AT PEAK YARD FOR ONE DAY OF MAINTENANCE BEFORE PROCEEDING ON TO 12-03A. PnMed 8/212017 4.06 04PM *At depths reported in Drillers Depths' T/1/0= Vac/0/200 Post CDR2. Set 4" H TWC #429 @ 125". R/D 4" CDR tree. Install 4" CIW Upper production tree. Torqued to API Specs. PT'd Upper Tree against MV. Low 300psi, High 5000psi.(Passed). Pulled 4" H TWC #429 @125 ". Installed tree cap plug & 7/1/2017 PTd to 500psi. (Passed). RDMO. *** Job Complete*** See log for details. FWHP= CTU #14 -1.75" CT (DrifURPM/Pert) MIRU. Start 7 -day BOP Test. 7/4/2017 ***Job Continued on WSR 07/05/17*** CTU #14 - 1.75" CT (Drif /RPM/Perf) **"Job Continued from WSR 07/04/17*** Complete 7 -day BOP Test. Liner Lap Test FAILED (Post Rig). TWO = 0/42/206, temp = SI. Max applied pressure = 2400 psi. Target pressure = 2160 psi. Obtained a LLR of 9.5 gpm @ 2015 psi. MU and RIH with 2.25" DJN drift BHA. Tag Bottom @ 13629' do / @ 13615' up. Stop and paint Flag @ 13564POOH. MU and RIH with Baker RPM tools and tag lightly on btm @ 13626'E and log from compression up to 10200'@ 20 FPM. Perform repeat pass from 11550'- 11350'. POOH. Download log data and make (+) 37' correction to be on depth with reference log: Baker MWD GR on 07/27/17. Cut 100' of pipe. Stack down change packoffs. 7/5/2017 ***Job continued on WSR 07/06/17*** CTU #14 - 1.75" CT (Drift/RPM/Pert) ***Job Continued from WSR 07/05/17*** MU and RIH with 20' of 2" Millenium Perf Guns. Perforate 13,553-13,573'. POOH. FP well with 30bbls of 50/50 methanol. Pump 10bbl of CONQOR 303A corrosion inhibitor in 1.75" coil -reel #5849 (pre pipe swap to 2"). Load 1/2" foam pig, displace coil to N2. 7/6/2017 1 ***Job Complete*** p North America - ALASKA - BP Prudhoe Bay PB B Pad B-36 B -36A 500292266701 Design: B -36A Final Survey Report 28 June, 2017 riFag BAKER HUGHES %0+41"s by Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB B Pad Well: 8-36 Wellbore: B -36A Design: B -36A BP Final Survey Report Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Database: WE am RAWER HUGHES Wall B-36 ORIG KELLY BUSHING @ 76.91usft (DOYON 16) ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) True Minimum Curvature EDM RSK-Alaska PROD -ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Use AK [4267°15864] Using Well Reference Point - Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734°7586, Using geodetic scale factor Site PS B Pad, TR -11-14 Site Position: Northing: 5,946,440.220 usft Latitude: 70° 15'15' 36.4 From: Map Easting: 662,094.050 usft Longitude: 148° 41' 22.843 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.23 ° - WON 8 -36,B -36__ WON Position +N/ -S 0.00 usft Northing: 5,950,114.740 usft Latitude: 70' 16'12.259 N +EJ -W 0.00 usft Easting: 663,733.740 usft Longitude: 148° 40'32.816 W Position Uncertainty 0.00 usft Wellhead Elevation: 43.23 usft Ground Level: 41.33 usft Wellbore B -36A Magnetic$ Model Name Sample Date Declination Dip Angle Field Strength (ron BGGM2016 7/1/2017 17.81 80.99 57,547 - Design B -36A — _- - - - - Audit Notes: Version: Phase: ACTUAL Tie On DspN: 11,524.60 Vertical Section: Depth From (TVD) +NI -S +H -W Direction (usft) (usft) (usft) r) 33.68 0.00 0.00 74.94 6/282017 2: 17:30PM Page 2 COMPASS 5000.1 Build 81D ,Z by 5101W Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB B Pad Well: B-36 Wellbore: B -36A Design: B -36A Survey Program Date 6/28/2017 From TO (usft) (usft) Survey (Wellbore) 100.00 6,050.00 Survey #2 (B-36) 6,107.49 11,524.60 1 : MWD - Standard (8-36) 11,547.00 13,656.40 BHI CTK MWD (B -36A) BP FEARS Final Survey Report BAKER MWD HUGHES Local Co-ordinate Reference: Well B-36 TVD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) MD Reference: ORIG KELLY BUSHING Q 76.91 usft (DOYON 16) Norm Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Tool Name Description GYD-GC-MS Gyrodala gyrocompassing m/s MWD MWD -Standard MWD MWD - Standard Survey MD Inc AN (azimuth) TVD TVDSS NIS E W Nothing Easting DLeg V. Sec (usft) (°) 0 (usft) (usft) (usft) (usft) (usft) (usft) (°1100uaR) (usft) 33.68 0.00 0.00 33.68 43.23 0.00 0.00 5,950,114.740 663,733.740 0.00 0.00 100.00 0.12 158.07 100.00 23.09 -0.06 0.03 5,950,114.676 663,733.767 0.18 0.01 110.00 0.11 158.30 110.00 33.09 -0.08 0.03 5,950,114.657 663,733.775 0.06 0.01 20" 200.00 0.06 162.42 200.00 123.09 -0.21 0.08 5,950,114.530 663,733.825 0.08 0.02 300.00 0.08 101.96 300.00 223.09 -0.28 0.16 5,950,114.468 663,733.911 0.07 0.09 400.00 0.37 88.91 400.00 323.09 -0.27 0.56 5,950,114.479 663,734.301 0.29 0.47 500.00 1.88 119.32 499.98 423.07 -1.06 2.31 5,950,113.732 863,736.071 1.58 1.95 600.00 3.47 118.84 599.87 522.96 -3.32 6.39 5,950,111.558 663,740.200 1.59 5.31 -� 700.00 4.15 116.59 699.64 622.73 -6.40 12.28 5,950,108.608 863,746.152 0.70 10.19 750.00 4.52 111.92 749.50 672.59 -7.95 15.72 5,950,107.138 863,749.630 1.02 13.12 800.00 4.99 108.54 799.33 722.42 -9.37 19.61 5,950,105.796 663,753.549 1.09 16.50 850.00 5.10 109.78 849.13 772.22 -10.82 23.76 5,950,104.443 663,757.733 0.31 20.14 900.00 5.42 106.98 898.92 822.01 -12.26 28.11 5,950,103.096 663,762.112 0.82 23.96 950.00 5.59 110.10 948.89 871.78 -13.79 32.66 5,950,101.669 663,766.689 0.69 27.96 1,000.00 5.98 114.56 996.44 921.53 -15.70 37.32 5,950,099.852 663,771.386 1.19 31.95 1,050.00 6.21 113.34 1,048.16 971.25 -17.86 42.17 5,950,097.804 663,776.283 0.53 36.08 1,100.00 6.77 121.35 1,097.84 1,020.93 -20.46 47.17 5,950,095.309 663,781.338 2.13 40.23 1,150.00 7.52 117.41 1,147.45 1,070.54 -23.50 52.59 5,950,092.388 663,786.824 1.79 44.68 1,200.00 8.19 122.90 1,196.98 1,120.07 -28.94 58.48 5,950,089.077 663,792.792 2.01 49.47 1,250.00 9.91 119.36 1,248.36 1,169.45 -30.99 65.22 5,950,085.180 663,799618 3.61 54.93 6262017 2'17.30PM Page 3 COMPASS 5000.1 Build 81D Survey MD Inc AN (mlinuth) as ko♦o by NIS Final Survrvey Report B4KER Easting DLeg V. Sac HUGHES Company: NOM America - ALASKA - BP Local Cc -ordinate Reference: Well B-36 Protect Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Well: B-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc AN (mlinuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sac (usft) (1) (') (usft) (usft) (usft) (usft) (usft) (usft) (°1100usfq (usft) 1,300.00 11.08 119.06 1,295.52 1,218.61 -35.43 73.17 5,950,080.911 663,807.663 2.34 61.45 1,350.00 12.15 119.03 1,344.49 1,267.58 -40.32 81.97 5,950,076.217 863,816.567 2.14 68.68 1,400.00 13.34 115.85 1,393.26 1,316.35 -45.39 91.77 5,950,071.363 663,826.466 2.76 76.82 1,450.00 14.06 114.02 1,441.84 1,364.93 -50.37 102.51 5,950,066.611 663,837.310 1.68 85.90 1,500.00 14.74 112.20 1,490.27 1,413.36 -55.25 113.94 5,950,061.985 663,848.850 1.63 95.67 1,550.00 14.75 109.00 1,538.62 1,461.71 -59.73 125.85 5,950,057.770 663,860.851 1.63 106.01 1,600.00 15.60 107.18 1,586.88 1,509.97 -63.78 138.29 5,950,053.984 663,873.377 1.95 116.97 1,850.00 15.94 106.46 1,635.00 1,558.09 -67.72 151.30 5,950,050.336 663,886.466 0.78 128.51 1,700.00 16.41 107.13 1,683.02 1,606.11 -71.74 164.63 5,950,046.602 663,899.884 1.01 140.34 1,750.00 16.87 100.46 1,730.93 1,654.02 -75.14 178.52 5,950,043.507 663,913.839 3.93 152.86 1,800.00 16.98 100.58 1,778.76 1,701.85 -77.80 192.83 5,950,041.162 663,928.203 0.23 165.99 1,850.00 17.77 101.50 1,828.48 1,749.57 -80.66 207.48 5,950,036.620 663,942.915 1.67 179.40 1,900.00 19.47 96.97 1,873.86 1,796.95 -83.19 223.23 5,950,036.431 663,958.715 4.46 193.95 1,950.00 22.23 91.39 1,920.59 1,843.811 -64.43 240.97 5,950,035.576 663,976.469 6.79 210.75 2,000.00 23.08 91.21 1,966.73 1,889.82 -64.87 280.22 5,950,035.558 663,995.726 1.71 229.23 _ 2,050.00 22.08 90.56 2,012.90 1,935.99 -85.17 279.42 5,950,035.677 664,014.923 2.06 247.69 2,100.00 21.64 90.25 2,059.30 1,982.39 -85.30 298.03 5,950,035.950 664,033.536 0.91 265.63 2,150.00 22.79 90.29 2,105.59 2,028.68 -85.39 316.94 5,950,036.272 664,052.436 2.30 283.86 2,200.00 25.05 90.45 2,151.29 2,074.38 -85.52 337.21 5,950,036.581 664,072.704 4.52 303.40 2,250.00 25.90 90.31 2,196.43 2,119.52 -85.66 358.71 5,950,036.906 664,094.206 1.70 324.13 2,300.00 26.05 90.84 2,241.38 2,164.47 -85.88 380.61 5,950,037.163 664,116.101 0.55 345.22 2,350.00 25.47 91.45 2,286.41 2,209.50 -66.32 402.34 5,950,037.203 664,137.829 1.26 366.09 2,400.00 25.58 92.04 2,331.53 2,254.62 -86.97 423.87 5,950,037.016 664,159.372 0.55 386.71 2,450.00 25.06 92.48 2,376.73 2,299.82 -87.81 445.24 5,950,036.639 664,180.751 1.11 407.13 2,500.00 25.53 93.83 2,421.94 2,345.03 -88.99 466.57 5,950,035.925 664,202.100 1.49 427.42 2,550.00 26.33 95.80 2,466.90 2,389.99 -90.83 488.35 5,950,034.559 664,223.916 2.35 447.98 2,600.00 27.02 96.04 2,511.58 2,434.67 -93.15 510.68 5,950,032.730 664,248.286 1.40 468.93 6/28/2017 2.17'30PM Page 4 COMPASS 5000.1 Build BID BP I/.as StiNa2 p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Site: PB B Pad MD Reference: Well: 8-36 North Reference: Wellbore: B -38A Survey Calculation Method: Design: B -36A Database: Survey MD Inc (usft) (') 2,650.00 2,700.00 2,750.00 2,800.00 2,850.00 2,900.00 2,950.00 3,000.00 3,050.00 3,100.00 3,150.00 3,200.00 3,250.00 3,300.00 3,350.00 3,400.00 3,450.00 3,500.00 3,550.00 3,600.00 3,649.00 9 318' 3,650.00 3,700.00 3,750.00 3,800.00 3,850.00 Well 8-36 ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) True Minimum Curvature EDM RSK- Alaska PROD -ANCPI �IIII V. Sac (usft) 490.99 514.43 538.82 563.77 588.96 614.67 641.40 669.27 697.98 727.48 757.90 789.32 821.63 854.36 887.30 - 920.24 953.33 987.09 1,021.24 1,056.28 1,090.55 43.27 Aar (azimuth) TVD TVDSS NIS ENO Northing Easting DLeg 1,091.23 (°) (usft) (usft) (usft) (usft) (usft) (usft) ('1100usit) 29.28 95.35 2,555.66 2,478.75 -95.49 534.15 5,950,030.900 664,269.801 4.56 30.53 94.25 2,599.01 2,522.10 -97.58 558.99 5,950,029.353 664,294.678 2.74 31.49 93.23 2,641.86 2,564.95 -99.25 584.69 6,950,028.236 664,320.410 2.19 31.59 91.58 2,684.47 2,607.56 -100.35 610,82 5,950,027.707 664,346.555 1.74 31.78 91.15 2,727.02 2,650.11 -100.98 637.07 5,950,027.653 664,372.816 0.59 32.98 91.14 2,769.25 2,692.34 -101.51 663.84 5,950,027.701 664,399.590 2.40 34.60 90.70 2,810.80 2,733.89 -101.95 691.65 5,950,027.862 664,427.394 3.28 36.13 90.39 2,851.57 2,774.66 -102.23 720.58 5,950,028.217 664,456.328 3.08 36.73 89.01 2,891.80 2,814.89 -102.07 750.27 5,950,029.021 664,486.005 2.03 37.91 87.53 2,931.56 2,854.65 -101.15 780.57 5,950,030.600 664,518.273 2.96 39.04 86.48 2,970.71 2,893.80 -99.52 811.64 5,950,032.904 664,547.292 2.61 40.56 85.39 3,009.12 2,932.21 -97.25 843.56 5,950,035.872 664,579.156 3.34 41.40 84.06 3,046.87 2,969.86 -94.23 876.21 5,950,039.598 664,611.729 2.42 41.50 82.80 3,084.35 3,007.44 -90.44 909.09 5,950,044.100 664,644.516 1.68 41.82 82.34 3,121.70 3,044.79 -86.14 942.04 5,950,049.113 664,677.368 0.89 4138 82.05 3,159.09 3,082.18 -81.64 974.93 5,950,054.335 664,710.149 0.96 42.27 81.90 3,196.35 3,119.44 -76.98 1,007.95 5,950,059.707 664,743.054 1.79 43.46 81.85 3,233.00 3,156.09 -72.17 1,041.62 5,950,065.245 664,776.610 2.38 43.51 82.03 3,269.28 3,192.37 -67.35 1,075.69 5,950,070.809 664,810.563 0.27 46.38 82.36 3,304.66 3,227.75 -62.56 1,110.68 5,950,076.363 664,845.439 5.76 43.33 82.24 3,339.39 3,262.48 -57.93 1,144.92 5,950,081.735 664,879.574 6.22 43.27 82.24 3,340.12 3,263.21 -57.84 1,145.60 5,950,081.842 664,880.251 6.22 1,091.23 44.05 82.36 3,376.29 3,299.38 -53.21 1,179.81 5,950,087.210 684,914.347 1.57 1,125.46 43.49 82.59 3,412.40 3,335.49 -48.68 1,214.10 5,950,092.484 664,948.528 1.16 1,159.75 43.56 82.57 3,448.65 3,371.74 -44.23 1,248.25 5,950,097.672 664,982.566 0.14 1,193.88 43.23 79.95 3,484.99 3,408.08 -39.02 1,282.19 5,950,103.625 685,018.389 3.66 1,228.02 6/2112017 2,17:3OPM Page 5 COMPASS 5000.1 Build 81D by BP Final Survey Report Company: North America - ALASKA - BP Project Prudhoe Bay Sire: PB 8 Pad Well: B-36 Wellbore: B -36A Design: B -36A Survey._. (usft) WIPARI BAKER HUGHES Local Co-ordinate Reference: Well 8-36 TVD Reference: ORIG KELLY BUSHING Q 76.9lusft (DOYON 16) MD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) North Reference: Two Survey Calculation Method: Minimum Curvature Database: EDM R5K- Alaska PROD - ANCP1 MD Inc AN(azimuth) TVD TVDSS NIS EIW Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°It00usft) 3,900.00 43.20 79.20 3,521.43 3,444.52 -32.82 1,315.86 5,950,110.551 665,049.915 1.03 3,950.00 42.75 77.41 3,558.01 3,481.10 -25.92 1,349.24 5,950,118.181 665,083.129 2.60 4,000.00 42.21 77.20 3,594.89 3,517.98 -18.50 1,382.18 5,950,126.315 665,115.898 1.12 4,050.00 42.72 77.29 3,631.77 3,554.86 -11.04 1,415.10 5,950,134.482 665,148.650 1.03 4,100.00 42.44 77.55 3,688.59 3,591.68 -3.67 1,448.12 5,950,142.567 665,181.498 0.66 4,150.00 43.78 78.00 3,705.09 3,628.18 3.56 1,481.52 5,950,150.525 665,214.725 2.75 4,200.00 43.12 78.19 3,741.39 3,664.48 10.65 1,515.16 5,950,158.348 665,248.207 1.35 4,250.00 43.11 78.35 3,777.89 3,700.98 17.60 1,548.62 5,950,166.021 665,281.505 0.22 4,300.00 43.06 78.80 3,814.40 3,737.49 24.37 1,582.10 5,950,173.513 665,314.825 0.62 4,350.00 43.28 79.04 3,850.87 3,773.96 30.94 1,615.67 5,950,180.815 665,348.242 0.55 4,400.00 42.91 78.80 3,887.38 3,810.47 37.50 1,649.19 5,950,188.107 665,381.613 0.81 4,450.00 43.16 78.70 3,923.93 3,847.02 44.16 1,682.66 5,950,195.490 665,414.924 0.52 4,500.00 43.03 78.78 3,960.44 3,883.53 50.83 1,716.16 5,950,202.887 665,448.272 0.28 4,550.00 42.95 78.97 3,997.01 3,920.10 57.41 1,749.62 5,950,210.191 665,481.571 0.30 4,800.00 42.78 79.18 4,033.66 3,956.75 63.86 1,783.01 5,950,217.362 665,514.818 0.44 4,650.00 42.34 79.18 4,070.49 3,993.58 70.20 1,816.23 5,950,224.431 665,547.886 0.88 4,700.00 42.36 79.20 4,107.44 4,030.53 76.52 1,849.31 5,950,231.466 665,580.824 0.05 4,750.00 41.75 79.30 4,144.57 4,067.66 82.77 1,882.22 5,950,238.427 665,613.582 1.23 4,800.00 42.07 79.52 4,181.77 4,104.86 86.91 1,915.05 5,950,245.277 665,646.268 0.70 4,850.00 41.49 79.76 4,219.06 4,142.15 94.90 1,947.82 5,950,251.979 665,678.898 1.20 4,900.00 42.38 80.18 4,256.26 4,179.35 100.72 1,980.72 5,950,258.512 665,711.665 1.87 4,950.00 42.58 80.45 4,293.13 4,216.22 106.40 2,014.01 5,950,264.915 665,744.816 0.54 5,000.00 42.39 80.49 4,330.00 4,253.09 111.99 2,047.31 5,950,271.228 665,777.988 0.38 5,050.00 42.14 80.72 4,367.01 4,290.10 117.48 2,080.49 5,950,277.438 665,811.035 0.59 5,100.00 41.56 81.18 4,404.25 4,327.34 122.73 2,113.43 5,950,283.401 665,843.854 1.31 5,150.00 41.91 81.03 4,441.56 4,364.65 127.87 2,146.32 5,950,289.261 665,878.616 0.73 5,200.00. 42.87 80.79 4,478.49 4,401.58 133.20 2,179.60 5,950,295.310 665,909.775 1.95 I V. Sec (usft) 1,262.14 1,296.16 1,329.90 1,363.63 1,397.43 1,431.56 1,465.89 1,500.01 1,534.09 1,568.22 1,602.30 1,636.34 1,670.43 1,704.44 1,738.37 -- 1,772.09 1,805.68 1,839.08 1,872.38 1,905.58 1,938.86 1,972.48 2,006.09 2,039.56 2,072.73 2,105.82 2,139.35 6/282017 2:17:30PM Page 6 COMPASS 50001 Build 61D BID r Final Survey Report BMER " HUGHES Company: North America -ALASKA -BP Local Co-ordinate Reference: Well B-36 Project: Prudhoe Bey TVD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) Well: 8-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EDM RSK-Alaska PROD -ANCP1 Survey MD Inc Azl (azimuth) TVD TVDSS NIS EfW Northing Eating DL99 V. Sec (usft) 0 1°I lush) (usft) (usft) (usft) (usft) (usft) (9100usft) (usft) 5,250.00 43.55 80.62 4,514.93 4,438.02 138.73 2,213.38 5,950,301.573 665,943.428 1.38 2,173.41 5,300.00 43.07 80.67 4,551.31 4,474.40 144.30 2,247.22 5,950,307.882 665,977.138 0.96 2,207.54 5,350.00 43.23 80.80 4,587.79 4,510.88 149.81 2,280.97 5,950,314.120 666,010.757 0.37 2,241.56 5,400.00 43.23 81.16 4,624.22 4,547.31 155.18 2,314.80 5,950,320.223 666,044.453 0.49 2,275.61 5,450.00 42.89 81.63 4,660.76 4,583.85 160.29 2,348.55 5,950,326.064 666,078.085 0.94 2,309.54 5,500.00 42.49 82.46 4,697.51 4,620.60 164.98 2,382.13 5,950,331.486 666,111.547 1.38 2,343.18 5,550.00 42.33 82.71 4,734.42 4,857.51 169.33 2,415.56 5,950,336.564 666,144.882 0.46 2,376.60 5,600.00 42.56 82.40 4,771.32 4,694.41 173.70 2,449.02 5,950,341.663 666,178.236 0.82 2,410.04 5,650.00 43.53 81.47 4,807.86 4,730.95 178.49 2,482.81 5,950,347.187 666,211.911 2.32 2,443.92 5,700.00 43.58 81.69 4,844.10 4,767.19 183.54 2,516.69 5,950,352.972 666,245.872 0.32 2,478.14 5,750.00 43.36 82.06 4,860.38 4,803.47 188.40 2,550.95 5,950,358.573 666,279.809 0.67 2,512.29 5,800.00 43.82 81.49 4,916.60 4,839.69 193.33 2,585.07 5,950,364.246 666,313.811 1.21 2,546.52 5,850,00 43.59 79.69 4,952.75 4,875.84 198.98 2,619.15 5,950,370.632 666,347.757 2.53 2,580.89 5,900.00 43.68 80.11 4,988.93 4,912.02 205.03 2,653.12 5,950,377.420 666,381.583 0.61 2,615.27 5,950.00 44.65 81.12 5,024.80 4,947.89 210.71 2,687.48 5,950,383.844 666,415.819 2.40 2,649.93 6,000.00 45.14 82.49 5,060.22 4,983.31 215.74 2,722.41 5,950,389.630 666,450.627 2.17 2,684.97 6,050.00 45.18 82.90 5,095.48 5,018.57 220.24 2,757.58 5,950,394.902 666,485.684 0.59 2,720.09 6,107.49 46.60 81.80 5,135.49 5,058.58 225.74 2,798.49 5,950,401.289 666,526.460 2.83 2,781.03 6,202.96 46.10 81.70 5,201.39 5,124.48 235.66 2,866.85 5,950,412.686 666,594.588 0.53 2,829.62 6,298.62 45.40 78.50 5,268.15 5,191.24 247.42 2,934.34 5,950,425.917 666,661.796 2.51 2,897.84 6,393.20 46.00 79.20 5,334.21 5,257.30 260.51 3,000.75 5,950,440.445 666,727.903 0.83 2,965.37 6,489.02 46.20 78.20 5,400.65 5,323.74 274.04 3,068.45 5,950,455.443 666,795.291 0.78 3,034.27 6,584.86 45.40 75.60 5,467.47 5,390.56 289.80 3,135.36 5,950,472.453 666,861.843 2.12 3,102.92 6,680.64 44.40 74.50 5,535.31 5,458.40 307.03 3,200.68 5,950,491.304 666,926.762 1.32 3,170.53 6,776.28 42.70 74.00 5,604.63 5,527.72 324.92 3,264.10 5,950,510.559 666,989.773 1.81 3,236.42 6,871.63 42.40 74.50 5,675.02 5,598.11 342.46 3,326.29 5,950,529.446 667,051.560 0.47 3,301.02 6,967.59 42.30 74.00 5,745.79 5,668.88 359.97 3,388.37 5,950,548.302 667,113.247 0.37 3,365.53 6128/2017 2:17.30PM Page 7 COMPASS 5000.1 Build 810 ii BP FS as � by Final Survey Report BAKER HUGHES Company: North Amenca-ALASKA-BP Local Co-ordinate Reference: Well B-36 Project Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Well: B-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EDM RSK- Alaska PROD -ANCPI Survey MD Inc Azi (azimuth) ND NDSB NIS FJW Northing Easting DLag V. Sec (usft) (°) 1°I (usft) (usft) (usft) (usft) (usft (usft) (°1100uaf) (usft) 7,063.40 42.30 73.60 5,816.68 5,739.75 377.95 3,450.30 5,950,567.633 667,174.758 0.28 3,430.00 7,137.88 42.40 74.30 5,871.70 5,794.79 391.83 3,498.51 5,950,582.549 667,222.659 0.65 3,480.16 7,230.84 42.40 75.70 5,940.35 5,863.44 408.05 3,559.06 5,950,600.083 667,282.832 1.02 3,542.84 7,326.46 42.40 77.00 6,010.96 5,934.05 423.26 3,621.71 5,950,616.657 667,345.134 0.92 3,607.30 7,422.05 42.50 79.10 6,081.50 6,004.59 436.62 3,684.82 5,950,631.382 667,407.937 1.49 3,671.71 7,517.67 42.10 79.60 6,152.37 6,075.46 448.54 3,748.20 5,950,644.676 667,471.035 0.55 3,736.01 7,614.01 41.80 79.80 6,223.87 6,146.96 460.03 3,811.43 5,950,657.539 667,533.998 0.34 3,800.06 7,708.33 42.90 80.10 6,293.58 6,216.67 471.12 3,874.00 5,950,669.983 667,596.301 1.19 3,863.35 7,804.11 43.00 79.60 6,363.68 6,286.77 482.62 3,938.23 5,950,682.878 667,660.270 0.37 3,928.37 7,898.85 42.90 79.60 6,433.03 6,356.12 494.27 4,001.73 5,950,695.908 667,723.489 0.11 3,992.71 7,995.28 42.60 80.10 6,503.84 6,426.93 505.81 4,066.16 5,950,708.842 667,787.650 0.47 4,057.93 8,089.95 42.10 79.40 6,573.80 6,496.69 517.15 4,128.91 5,950,721.550 667,850.140 0.73 4,121.48 8,163.96 41.10 78.90 6,644.10 6,567.19 528.90 4,190.21 5,950,734.626 667,911.165 1.12 4,183.72 8,280.93 40.80 78.70 6,717.34 6,640.43 541.24 4,252.56 5,950,748.323 667,973.221 0.34 4,247.13 8,376.10 41.30 78.90 6,789.11 6,712.20 553.38 4,313.87 5,950,761.791 668,034.248 0.54 4,309.49 8,471.71 41.60 79.60 6,860.78 6,783.87 565.19 4,376.05 5,950,774.944 668,098.151 0.58 4,372.60 8,567.02 42.60 80.10 6,931.49 6,854.58 576.44 4,438.94 5,950,787.567 666,158.785 1.11 4,436.26 8,662.66 43.50 81.20 7,001.36 6,924.47 587.05 4,503.36 5,950,799.566 668,222.953 1.23 4,501.22 8,758.51 43.10 81.00 7,071.14 6,994.23 597.21 4,568.31 5,950,811.145 668,287.856 0.44 4,568.58 8,654.50 42.70 81.40 7,141.46 7,064.55 607.21 4,632.88 5,950,822.544 668,351.991 0.50 4,631.53 8,949.28 42.30 81.90 7,211.34 7,134.43 616.51 4,696.23 5,950,833.219 668,415.122 0.55 4,695.12 9,045.13 41.60 80.10 7,282.63 7,205.72 626.53 4,759.51 5,950,844.608 668,478.165 1.45 4,758.83 9,140.85 41.30 81.00 7,354.37 7,277.46 636.93 4,822.01 5,950,856.369 668,540.422 0.70 4,821.89 9,235.03 40.80 79.10 7,425.40 7,348.49 647.61 4,882.93 5,950,868.372 668,601.085 1.43 4,883.49 9,331.31 41.70 78.70 7,497.78 7,420.87 659.84 4,945.22 5,950,881.946 668,663.093 0.97 4,946.82 9,421.19 41.20 78.40 7,565.15 7,488.24 671.65 5,003.53 5,950,895.022 668,721.131 0.60 5,006.20 9,522.31 41.20 78.00 7,641.24 7,584.33 685.27 5,068.73 5,950,910.056 668,786.014 0.26 5,072.70 6/282017 2.17.30PM Page 8 COMPASS 5000 1 Build 81O BP IER by Final Survey Report BAKER HUGHES Company: North America -ALASKA - BP Local Co-ordinate Reference: Well B-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Well: B-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc AN (ulmuth) TVD iVDSS NIS EIW Northing Pwting DLog V. Sec (usft) 1°I 1'1 (usft) (usft) (usft) (usft) (usft) (usft) ('1100USR) (usft) 9,617.08 42.20 78.70 7,712.00 7,635.09 697.99 5,130.48 5,950,924.122 668,847.462 1.16 5,135.63 9,712.25 42.80 78.20 7,782.17 7,705.26 710.87 5,193.48 5,950,938.365 668,910.163 0.72 5,199.81 9,807.98 41.90 78.20 7,852.91 7,776.00 724.06 5,256.60 5,950,952.920 668,972.976 0.94 5,264.19 9,903.58 41.20 79.10 7,924.46 7,847.55 736.54 5,318.76 5,950,966.751 669,034.851 0.96 5,327.46 9,998.99 41.80 80.30 7,995.91 7,919.00 747.84 5,380.96 5,950,979.400 669,096.786 1.04 5,390.46 10,094.94 42.80 80.80 8,066.88 7,989.97 758.44 5,444.66 5,950,991.382 669,160.235 1.10 5,454.72 10,190.36 42.30 81.00 8,137.18 8,060.27 768.64 5,508.37 5,951,002.970 669,223.707 0.54 5,518.90 10,285.97 41.10 81.20 8,208.56 8,131.65 778.48 5,571.21 5,951,014.175 669,286.309 1.26 5,582.14 10,381.59 41.40 81.20 8,280.45 8,203.54 788.13 5,633.51 5,951,025.173 669,348.385 0.31 5,644.81 10,477.61 43.20 80.00 8,351.47 8,274.56 798.70 5,697.26 5,951,037.122 669,411.883 2.05 5,709.11 10,572.89 42.50 80.30 8,421.32 8,344.41 809.78 5,761.10 5,951,049.593 669,475.465 0.77 5,773.64 10,669.76 42.50 80.80 8,492.74 8,415.83 820.53 5,825.66 5,951,061.739 669,539.767 0.35 5,838.77 10,748.92 42.80 81.00 8,550.96 8,474.05 829.01 5,878.62 5,951,071.371 669,592.524 0.42 5,892.11 10,798.90 41.90 80.50 8,587.90 8,510.99 834.42 5,911.85 5,951,077.503 669,625.627 1.92 5,925.81 10,823.00 42.34 80.28 8,605.78 8,528.87 837.12 5,927.78 5,951,080.547 669,641.500 1.93 5,941.70 7.. 10,831.74 42.50 80.20 8,612.23 8,535.32 838.12 5,933.59 5,951,081.673 669,647.287 1.93 5,947.57 10,862.59 45.30 80.00 8,634.46 8,557.55 841.80 5,954.67 5,951,085.808 669,668.271 9.09 5,968.87 10,892.61 49.30 79.20 8,654.81 8,577.90 845.78 5,976.36 5,951,090.265 669,689.872 13.47 5,990.86 10,922.15 52.40 80.00 8,673.46 8,596.55 849.91 5,998.89 5,951,094.886 669,712.304 10.70 6,013.69 10,954.09 56.40 80.00 8,692.05 8,615.14 854.42 6,024.46 5,951,099.949 669,737.769 12.52 6,039.55 10,985.89 59.10 78.60 8,709.02 8,632.11 859.42 6,050.88 5,951,105.520 669,764.074 9.27 6,066.36 11,017.23 62.60 75.80 8,724.23 8,647.32 865.50 6,077.59 5,951,112.179 669,790.639 14.15 6,093.73 11,048.41 65.60 73.20 8,737.80 8,660.89 873.01 6,104.63 5,951,120.272 669,817.511 11.70 6,121.80 11,081.28 67.50 69.30 8,750.89 8,673.98 882.70 6,133.17 5,951,130.587 669,845.835 12.32 6,151.88 11,110.52 67.90 64.80 8,761.99 8,685.08 893.25 6,158.08 5,951,141.672 669,870.501 14.30 6,178.67 11,145.04 67.20 60.30 8,775.18 8,698.27 907.95 6,186.38 5,951,156.983 669,898.476 12.22 6,209.82 6282017 2:17:30PM Page 9 COMPASS 50001 Build 81D Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB B Pad Well: 8-36 Wellbore: B -36A Design: B -36A Survey MD I (usft) 11,182.25 11,214.22 11,245.14 11,276.01 11,306.33 11,337.90 11,369.82 11,401.98 11,425.50 11,463.17 11,494.62 11,524.60 TIP 11,547.00 KOP-TOWS 11,550.00 4112" 11,570.18 Interpolated Azimuth 11,600.30 Interpolated Azimuth 11,630.12 Interpolated Azimuth 11,660.21 11,680.94 11,710.61 11,740.80 11,770.28 BP HIM Final Survey Report BMER NIS HUGHES Local Coordinate Reference: Well B-36 TVD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 18) MD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K- Alaska PROD - ANCP1 nc Azi(azimuth) ND TVDSS NIS EM Northing Eastirg DLeg V. Sec 74.70 32.55 (usft) (usft) (usft) (usft) (usft) (usft) (°HOOusft) (usft) 66.70 54.10 8,789.76 8,712.85 926.48 6,215.14 5,951,176.136 669,926.828 15.39 6,242.41 66.70 53.60 8,802.40 8,725.49 943.80 6,238.85 5,951,193.967 669,950.154 1.44 6,269.80 66.20 52.90 8,814.76 8,737.85 960.76 6,261.57 5,951,211.415 669,972.489 2.63 6,296.14 65.70 53.50 8,827.34 8,750.43 977.65 6,284.14 5,951,228.787 669,994.687 2.40 6,322.33 65.70 53.30 8,839.82 8,762.91 994.13 6,306.32 5,951,245.741 670,016.507 0.60 6,348.03 65.60 52.50 8,852.83 8,775.92 1,011.47 6,329.26 5,951,263.583 670,039.062 2.33 6,374.69 65.70 52.50 8,865.99 8,789.08 1,029.18 6,352.33 5,951,281.783 670,061.741 0.31 6,401.57 65.40 52.20 8,879.30 8,802.39 1,047.06 6,375.51 5,951,300.164 670,084.524 1.26 6,428.60 65.90 51.80 8,889.00 8,812.09 1,060.25 6,392.40 5,951,313.720 670,101.117 2.63 6,448.33 67.20 48.20 8,904.00 8,827.09 1,082.46 6,418.86 5,951,336.501 670,127.090 9.42 6,479.66 70.10 41.80 8,915.53 8,838.62 1,103.30 6,439.68 5,951,357.788 670,147.447 20.94 6,505.17 73.80 36.20 8,924.76 8,847.85 1,125.30 6,457.47 5,951,380.167 670,164.759 21.77 6,528.08 75.21 32.88 8,930.75 8,853.84 1,143.08 6,469.71 5,951,398.207 670,176.803 15.61 6,544.51 74.70 32.55 8,931.52 8,854.61 1,145.52 6,471.27 5,951,400.878 670,178.115 20.00 6,546.66 71.31 30.26 8,937.42 8,860.51 1,161.99 6,481.33 5,951,417.358 670,187.811 20.00 6,560.64 68.56 26.71 8,948.25 8,871.34 1,186.67 6,494.74 5,951,442.328 670,200.680 19.22 6,580.01 63.33 22.99 8,960.88 8,883.97 1,211.17 6,506.10 5,951,467.067 670,211.503 15.65 6,597.34 59.99 18.97 8,975.16 8,898.25 1,235.88 6,515.59 5,951,491.977 670,220.454 16.17 6,612.93 56.33 22.29 8,986.10 8,909.19 1,252.36 6,521.79 5,951,508.585 670,226.286 22.29 6,623.19 59.02 27.59 9,001.97 8,925.06 1,275.07 6,532.37 5,951,531.521 670,236.370 17.60 6,639.31 65.78 32.64 9,015.96 6,939.05 1,298.17 6,545.81 5,951,554.907 670,249.305 26.84 6,658.29 68.60 37.42 9,027.39 8,950.48 1,320.41 6,561.41 5,951,577.474 670,264.417 17.74 6,679.13 6728/2017 2: 1730PM Page 10 COMPASS 5000.1 Build 81D r'••s BP bp .�• Final Survey Report Company: North America - ALASKA - BP Project Prudhoe Bay Site: PB B Pad Well; B-36 Wellbore: B -36A Design: B -36A Survey I/.a\ HUGHES Local Coordinate Reference: Well B-36 TVD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) MD Reference: ORIG KELLY BUSHING Q 76.91 usft (DOYON 16) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 MD Inc AN (mimuth) TVD TVDSS WS ENV Northing Eastlrlg DLeg (usft) rl 1'1 (usft) (usft) (usft) (usft) (usft) (usft) (1100usf) 11,800.58 71.15 43.41 9,037.82 8,960.91 1,342.05 6,579.85 5,951,599.507 670,282.382 20.38 11,830.22 75.04 48.13 9,046.45 8,969.54 1,361.81 6,600.17 5,951,619.706 670,302.265 20.11 11,860.08 80.22 53.51 9,052.85 8,975.94 1,380.21 6,622.77 5,951,638.594 670,324.458 24.71 11,890.44 87.36 55.85 9,056.13 8,979.22 1,397.65 6,647.38 5,951,656.558 670,348.683 24.73 11,920.06 92.49 59.62 9,056.17 8,979.26 1,413.45 6,672.41 5,951,672.901 670,373.365 21.49 11,949.92 99.47 62.68 9,053.06 6,976.15 1,427.77 6,698.40 5,951,687.786 670,399.035 25.50 11,981.53 98.46 68.01 9,048.13 8,971.22 1,440.79 6,726.77 5,951,701.417 670,427.110 16.96 12,016.15 91.29 71.16 9,045.19 8,968.28 1,452.81 6,759.08 5,951,714.134 670,459.144 22.61 12,041.06 91.32 74.91 9,044.62 8,967.71 1,460.08 6,782.89 5,951,721.915 670,482.794 15.05 12,070.75 88.62 77.84 9,044.64 8,967.73 1,467.07 6,811.74 5,951,729.533 670,511.482 13.42 12,101.10 88.77 83.79 9,045.33 8,968.42 1,471.91 6,841.68 5,951,735.024 670,541.307 19.61 12,130.68 90.46 82.94 9,045.53 8,968.62 1,475.33 6,871.06 5,951,739.080 670,570.603 6.40 12,159.98 91.81 79.35 9,044.95 8,968.04 1,479.84 6,900.00 5,951,744.216 670,599.436 13.09 12,190.16 90.89 76.65 9,044.23 8,967.32 1,486.11 6,929.51 5,951,751.129 670,628.800 9.45 12,223.18 89.97 72.68 9,043.99 8,967.08 1,494.84 6,961.35 5,951,760.549 670,660.437 12.34 12,253.01 89.32 69.60 9,044.17 8,967.26 1,504.48 6,989.57 5,951,770.802 670,688.443 10.55 12,282.17 88.65 66.64 9,044.69 8,967.78 1,515.34 7,016.62 5,951,782.251 670,715.250 10.41 12,310.80 88.40 63.80 9,045.42 8,968.51 1,527.34 7,042.60 5,951,794.807 670,740.964 9.95 12,340.52 89.35 61.73 9,046.01 8,969.10 1,540.94 7,069.02 5,951,808.975 670,787.079 7.66 12,372.39 90.18 58.41 9,046.14 8,969.23 1,556.83 7,096.64 5,951,825.469 670,794.340 10.74 12,404.37 89.20 54.76 9,046.31 8,969.40 1,574.44 7,123.33 5,951,843.652 670,820.637 11.82 12,430.65 90.16 52.64 9,046.45 8,969.54 1,590.00 7,144.50 5,951,659.665 670,641.470 8.89 12,460.46 89.14 51.40 9,046.63 8,969.72 1,608.34 7,168.00 5,951,878.514 670,664.560 5.43 12,490.52 90.43 45.22 9,046.74 8,969.83 1,628.33 7,190.44 5,951,898.979 670,886.554 21.00 12,520.89 91.63 42.22 9,046.20 6,969.29 1,650.27 7,211.42 5,951,921.371 670,907.054 10.64 12,550.88 91.90 38.97 9,045.27 8,968.36 1,873.03 7,230.92 5,951,944.547 670,926.056 10.87 12,580.60 90.12 35.60 9,044.75 8,967.84 1,696.63 7,248.96 5,951,968.539 670,943.576 12.23 V. Sec (usft) 6,702.57 6,727.32 6,753.93 6,782.22 6,810.50 6,839.32 6,870.10 6,904.41 6,929.30 6,958.97 6,989.14 7,018.40 7,047.52 7,077.65 7,110.66 7,140.42 7,169.36 7,197.57 7,226.61 7,257.41 7,287.76 7,312.25 7,339.71 7,366.56 7,392.53 7,417.27 7,440.83 6282017 2: 17.30PM Page 11 COMPASS 5000.1 Build BID ,... BP Azl (uhnudi) byFinal Survey Report BAKER EAN Northing HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well B-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING Q 76.91 usft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Well: B-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EOM RSK- Alaska PROD -ANCP1 Survey MD Inc Azl (uhnudi) TVD TVOSS NIS EAN Northing Besting DLeg (usft) PI P) (usft) (usft) (usft) (usft) (usft) (usft) (°1100alft) 12,610.98 90.34 31.81 9,044.63 8,967.72 1,721.87 7,265.86 5,951,994.138 670,9%921 13.15 12,640.50 90.49 28.98 9,044.41 8,967.50 1,747.33 7,280.79 5,952,019.914 670,974.296 9.60 12,670.38 91.14 23.91 9,043.99 8,967.08 1,774.07 7,294.10 5,952,046.937 670,987.011 17.10 12,700.55 90.15 19.84 9,043.65 8,966.74 1,802.06 7,305.33 5,952,075.163 670,997.637 13.88 12,730.51 90.28 15.79 9,043.54 8,966.63 1,830.58 7,314.50 5,952,103.871 671,006.178 13.52 12,760.35 93.41 18.03 9,042.58 8,965.67 1,859.11 7,323.17 5,952,132.580 671,014.227 12.90 12,790.71 93.75 22.13 9,040.68 8,963.77 1,887.56 7,333.57 5,952,161.251 671,024.006 13.52 12,820.31 91.29 25.71 9,039.36 8,962.47 1,914.59 7,345.56 5,952,188.528 871,035.402 14.66 12,850.97 91.14 29.17 9,038.73 8,961.82 1,941.79 7,359.68 5,952,216.027 671,048.930 11.29 12,861.65 93.66 32.34 9,037.44 8,960.53 1,968.13 7,375.35 5,952,242.697 671,064.023 13.19 12,912.00 94.89 36.08 9,035.18 8,958.27 1,993.15 7,392.37 5,952,268.084 671,080.486 12.94 12,940.57 94.06 37.40 9,032.95 8,956.04 2,015.97 7,409.40 5,952,291.272 671,097.022 5.45 12,970.52 9175 39.25 9,031.43 8,954.52 2,039.44 7,427.95 5,952,315.131 671,115.053 9.88 13,000.82 90.21 43.39 9,030.91 8,954.00 2,062.18 7,447.95 5,952,338.306 671,134.550 14.58 13,030.25 89.69 47.84 9,030.94 8,954.03 2,082.76 7,468.98 5,952,359.338 671,155.123 15.22 13,061.08 87.60 49.54 9,031.67 8,954.76 2,103.11 7,492.12 5,952,380.179 671,177.822 8.74 13,090.80 89.08 51.74 9,032.53 8,955.62 2,121.95 7,515.09 5,952,399.512 671,200.373 8.92 13,120.75 90.74 55.24 9,032.58 8,955.67 2,139.76 7,539.16 5,952,417.845 671,224.046 12.93 13,150.91 93.81 57.92 9,031.38 8,954.47 2,156.36 7,564.31 5,952,434.983 671,248.825 13.51 13,180.14 98.13 60.66 9,028.34 6,951.43 2,171.20 7,589.29 5,952,450.366 671,273.479 17.47 13,210.83 102.02 62.11 9,022.97 8,946.06 2,185.67 7,615.81 5,952,465.408 671,299.675 13.50 13,240.52 104.84 64.19 9,016.08 8,939.17 2,198.72 7,641.57 5,952,479.008 671,325.143 11.69 13,271.06 109.97 67.64 9,006.94 8,930.03 2,210.61 7,668.16 5,952,491.481 671,351.462 19.96 13,300.39 112.03 70.99 8,996.43 8,919.52 2,220.29 7,693.77 5,952,501.710 671,376.852 12.77 13,335.72 111.51 76.48 8,983.32 8,906.41 2,229.47 7,725.25 5,952,511.574 671,408.125 14.50 13,365.24 108.80 79.50 8,973.14 8,896.23 2,235.23 7,752.35 5,952,517.921 671,435.093 13.28 13,390.64 108.54 83.77 8,965.01 8,888.10 2,238.73 7,776.15 5,952,521.936 671,458.810 15.96 V. Sec (usft) 7,463.70 7,484.74 7,504.53 7,522.66 7,538.92 7,554.70 7,572.14 7,590.74 7,611.44 7,633.42 7,656.35 7,678.73 7,702.74 7,727.96 7,753.61 7,781.25 7,808.33 7,836.20 7,864.79 7,892.78 7,922.14 7,950.41 7,979.17 8,006.42 8,039.20 8,066.87 8,090.76 628/2017 2:17.30PM Page 12 COMPASS 50001 Build BID 6/282017 2:17:30PM Page 13 COMPASS 5000.1 Build 810 BP I/.�� Zti��2 p Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well B-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 76.9lusft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) Well: B-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD T/DSS WS ENV Northing Easting 131-e9 V. Sec (usft' (•) (°) (usft) lush) (usft) lush) (usft) (usft) (°/100usfy (usft) 13,421.04 109.73 89.46 8,955.04 8,878.13 2,240.43 7,804.80 5,952,524.259 671,487.419 18.11 6,118.87 13,450.37 110.29 94.49 8,944.99 8,868.08 2,239.48 7,832.34 5,952,523.911 671,514.964 16.23 8,145.21 13,480.21 109.61 99.92 8,934.81 8,857.90 2,235.96 7,860.15 5,952,520.998 671,542.846 17.26 8,171.16 13,510.18 109.32 103.95 8,924.82 8,847.91 2,230.12 7,887.79 5,952,515.758 671,570.604 12.71 8,196.33 13,535.16 109.93 103.04 8,915.43 8,839.52 2,224.63 7,910.67 5,952,510.767 671,593.595 4.21 8,217.00 13,570.26 111.95 103.52 8,903.88 8,826.97 2,217.10 7,942.57 5,952,503.934 671,625.653 5.89 8,245.85 13,602.40 113.76 100.14 8,891.40 8,814.49 2,211.02 7,971.55 5,952,498.490 671,654.756 11.21 8,272.25 13,635.31 113.47 99.44 8,878.21 8,801.30 2,205.90 8,001.27 5,952,494.011 671,684.573 2.14 8,299.62 13,656.40 112.19 99.39 8,870.03 8,793.12 2,202.72 8,020.44 5,952,491.249 671,703.812 6.07 8,317.31 13,697.00 112.19 99.39 8,854.70 8,777.79 2,196.58 8,057.53 5,952,485.925 671,741.023 0.00 8,351.53 2 7/8" 13,702.00 112.19 99.39 8,852.81 8,775.90 2,195.83 8,062.10 5,952,485.269 671,745.606 0.00 8,355.74 Projection to TD -- Casing Pointe - _ Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) lush) No" (in) (in) 13,697.00 8,854.70 27/8" 2.875 4.250 11,550.00 8,931.52 4 1/2" 4.500 7.000 6/282017 2:17:30PM Page 13 COMPASS 5000.1 Build 810 1eN� by BP FORM S` t Final Survey Report BMER +W -S +PJ -W Company: Norm Amenca- ALASKA -BP Local Co-ordinate Reference: Well B-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 76.9lusft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING Q 76.91usft (DOYON 16) Weil: B-36 North Reference: True Wellbore: B-36A Survey Calculation Method: Minimum Curvature Design: B-36A Database: EDM RSK- Alaska PROD -ANCPt Design Annotations Measured Vertical Local Coordinates Depth Depth +W -S +PJ -W (usft) (usft) (usft) (usft) Comment 11,524.60 8,924.76 1,125.30 6,457.47 TIP 11,547.00 8,930.75 1,143.08 6,469.71 KOP-TOWS 11,570.18 6,937.42 1,161.99 6,481.33 Interpolated Azimuth 11,600.30 8,948.25 1,186.67 6,494.74 Interpolated Azimuth 11,630.12 8,960.88 1,211.17 6,506.10 Interpolated Azimuth 13,702.00 8,852.81 2,195.83 8,062.10 Projection to TD I Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes 82812017 2,17:30PM Page 14 COMPASS 5000.1 Build 81D POST DRILLING Ensdng(300usftlin) $ $ g W m m W aoW Oo� oO 0ww oOwi Owm ou.e�P aOu OoJ _-_oO. w Q 0 0 O0._+.O J 0 oO ePO oW oN eo'c 0o 00 00 NOee 0 oq e wS o 0 o e o 5954400 - B -3014-3D B qqOSp/d5�-qO$pBSPpB1 _•' _. 59541W 9000 'B-30/B-3DA 05/B-05DP 5951100{ . B-28IB-28 5954100 59538 W{ o 58530 5953500! o B -36A ACTUAL &153s 5953200- n ,-�B=07/B-07 LR- R-0,113m1595320D 0�p0 / 'tea BOt 3 B-OB/B-08A 000 �j, �0S0 2000 0 9000 oh B -27/B -27G B -36/B -36A PI.: P.dh..Rav [yswi:fiAi •`••o.•no uo un.n.ow. nvmc�.e naaniu� ao o ,m WelSleel PBBB-36 wen: 84 Wellbore: aaM Design:"MIBaN9aMl A yy� i x.rmmi B'�p P4ren1 WNb4n: Bab Te an MD: 11521b9 CooinleR lwbiues: Xtl xs.TUMT vu°rtl llNl XeAmxn gW°ELLr °ILMN3 na�W 4nbn ry51 x4nerce. 4u p n°x nPFl �� .. O°�6Euv °uww0nsiwryovoxmlHUGHM r.. BAKERObp o POST DRILLING Ensdng(300usftlin) $ $ g W m m W aoW Oo� oO 0ww oOwi Owm ou.e�P aOu OoJ _-_oO. w Q 0 0 O0._+.O J 0 oO ePO oW oN eo'c 0o 00 00 NOee 0 oq e wS o 0 o e o 5954400 - B -3014-3D B qqOSp/d5�-qO$pBSPpB1 _•' _. 59541W 9000 'B-30/B-3DA 05/B-05DP 5951100{ . B-28IB-28 5954100 59538 W{ o 58530 5953500! o B -36A ACTUAL &153s 5953200- n ,-�B=07/B-07 LR- R-0,113m1595320D 0�p0 / 'tea BOt 3 B-OB/B-08A 000 �j, �0S0 2000 0 9000 oh B -27/B -27G B -36/B -36A 00 o u \ 5951100 OO ao o ,m � 58/95001 o voi 5949390 Y9/B-1690 Y00 oo oc o 1B-21/8-21 -7000 B-19/6 19B B-29B-23AB 0216-02A 600 8000 o 8-22/B-22 5848700! - p 0 a /B-29 8 5948400- B_ /B-2 Q 8-29IB-29A 819 51pp� B I 2 DS/e-0 /B- 182 9/6.29APB1 B -22/8-22A - B{02/8.02 - P N N w w O O O e O Q O A O P O O O 0 lPii o W J � P W o u m m Y J O O O O . O O O O O e Easting(300 usft/in) J N + o O O O O O O O .—T— J o N O f�,IGCC 11 -DW; o -- 00 o u \ 5951100 OO North America - ALASKA - BP Prudhoe Bay PB B Pad B-36 AOGCC Offset Well Report 28 June, 2017 rias BAKER °G OO 00O Report HUGHES aNd� I i�bp ed Filter type: NO GLOBAL FILTER: Using user defined selection 6 filtering criteria WARNING: There is hidden Light data in this project Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB B Pad Site Error: 0oouSft Reference Well: 8-36 Well Error: 0.00usft Reference Wellbore B -36A Reference Design: B -36A BP Anticollision Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: ,efts BAKER HUGHES Well B-36 ORIG KELLY BUSHING @ 76.91usft (DOYON 16) ORIG KELLY BUSHING @ 76.91usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference B -36A ----� Filter type: NO GLOBAL FILTER: Using user defined selection 6 filtering criteria WARNING: There is hidden Light data in this project Interpolation Method: MD Interval 25.00usft Ercor Madel: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center- center disbnce of 1,213.72usft Error Surface: Elliptical Conic Survey Program Deb 6/28/2017 _ ----� From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 6,050.00 Survey #2 (B-36) GYD-GC-MS Gymdata gyrocompassing m/s 6,107.49 11,524.601: MWD - Standard (B-36) MWD MWD -Standard 11,547.00 13,656.40 BHI CTK MWD (B -36A) MWD MWD -Standard 6/262017 2:3613PM COMPASS 5000.1 Build 81D 2,.NS h BP //FA\ Z S by Anticollision Report BAKER %f♦ •'� HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well B-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Reference Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Site Error: 000usft North Reference: True Reference Well: B-36 Survey Calculation Method: Minimum Curvature Well Error: 0.0ousft Output errors are at 1.00 sigma Reference Wellbore B -36A Database: EDM RSK- Alaska PROD -ANCPt Reference Design: B -36A Offset TVD Reference: Offset Datum Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Whet Well - Wellbore - Design (usft) (usft) (usft) PB B Pad B-01 - B-01 - 8-01 2,154.26 2,100.00 463.66 8-02 - B-02 - B-02 2,131.05 2,075.00 346.96 B-02 - B -02A - B -02A 2,145.98 2,100.00 347.23 B-03 - 8-03 - 8-03 2,128.68 2,075.00 236.58 B-03 - B-03PB1 - B-03PB1 2,128.88 2,075.00 236.58 B -03A - B -03A - B -03A 2,120.88 2,075.00 158.20 B -03A - B -03B - B -03B 2,120.88 2,075.00 158.20 8-04 - B-04 - B-04 2,105.60 2,050.00 132.62 B-04 - B -04A - B -04A 2,105.60 2,050.00 132.62 B-D4-B-04APB1-B-04APB1 2,105.60 2,050.00 132.62 B -05 -B -05-B-05 10,344.82 10,675.00 406.09 B -05 -B -05A -B -05A 9,934.19 10,250.00 304.06 B-05 - B -05B - B -05B 2,114.91 2,075.00 226.17 B-05 - B -05C - B -05C 2,114.91 2,075.00 226.17 B-05 - B -05D - B -05D 2,114.91 2,075.00 226.17 8-05-B-05DPB1-B-05DPB1 2,114.91 2,075.00 226.17 B-06 - 8-06 - B-06 2,123.11 2,075.00 39.59 8-07 - B-07 - 8-07 2,152.17 2,100.00 65.15 B-07 - B -07A - B -07A 2,156.02 2,125.00 65.18 B-08 - 8-08 - B-08 2,143.37 2,100.00 266.10 B-08 - B -08A - B -08A 2,140.65 2,100.00 266.04 8-18 - 8-18 - B-18 622.70 625.00 179.29 B-19 - B-19 - 8-19 479.27 475.00 76.35 B-19 - B -19A- 8-19A 479.27 475.00 76.35 8 -19 -B -19B -B -19B 493.83 500.00 76.59 B-1 9 - B-1 9B - Plan #16 B-1 9B 492.26 500.00 76.56 B-20 - 8-20 - B-20 71.92 75.00 35.05 B-20 - B -20A - B -20A 71.92 75.00 35.05 B-21 - B-21 - B-21 1,275.45 1,275.00 131.64 8 -22 -B -22-B-22 1,475.00 1,475.00 229.30 B-22 - B -22A - B -22A 1,482.30 1,475.00 229.51 B -23 -B -23-B-23 1,557.21 1,550.00 337.33 8 -23 -B -23A -B -23A 1,564.17 1,550.00 337.44 8 -24 -B -24-B-24 1,606.98 1,600.00 445.35 B-27 - B-27 - B-27 2,110.44 2,075.00 112.46 8 -27 -B -27A -B -27A 2,116.48 2,075.00 112.52 8 -27 -B -27B -B -27B 2,116.48 2,075.00 112.52 B-27 - B -27C - B -27C 11,597.18 12,375.00 125.78 B-27 - B-27CPB1 - B-27CPB1 2,116.48 2,075.00 112.52 8-27-B-27CP82-B-27CPB2 2,116.48 2,075.00 112.52 B-26 - 8-28 - 8-28 2,046.23 2,000.00 227.77 8-29 - B-29 - B-29 566.63 575.00 131.60 B-29 - B -29A- B -29A 566.63 575.00 131.60 B-29 - B-29APB7 - B-29APB7 566.63 575.00 131.60 B -30 -B -30-B-30 1,121.03 1,125.00 84.95 B-30 - B -30A - B -30A 1,121.03 1,125.00 84.95 B-33 - B-33. B-33 693.54 675.00 442.19 B-33 - B -33A - B -33A 691.01 675.00 442.15 B -36-B-36-13-36 11,850.90 11,850.00 86.90 PB DS 07 07 -09 -07 -09A -07-09A 13,695.62 11,125.00 618.62 6282017 2:36:13PM COMPASS 5000.1 Build 81D urea O WZelr 3.50:01 PM North America - ALASKA - BP Page 1 of 2 Cementing Report Common Well Name: B-38 / 01 Project: Prudhoe Bey --- --- - -- - -- -- --- — ---Event no,:i Report date:6/30/2017____Ste:PBPad Type: COM-ONSHORE(CON) - - TReport Date/Time: 4/30/1996 StartDatiws/27/2017 End Date: o.:Contractor: NABORSALASKA DRILLING INC. - _ ---- Rig Name/No.: CDR -2 Rig Release: 8HL-C: (1,056,885.00) BPUOI: USAD0000626- _ -- --"—' - Active datum: KB @76.91usft (above Mean Sea Level) — - — -- General Information Job type: Primary Cement job start date/time. 660/2017 10 42A Job end date/time: 6130/2017 12:14PM Cement Company: SCHLUMBERGER Cementer: SETTLE Cemented String: PRODUCTION LINER 1 String Size: 2.675 (in) String Set TMD: 13,70200 lust) Hole Size: 4.250 (in) Pipe Movement Pipe Movement: NO MOVEMENT Rotating Time (Start -End): RPM. Rotating Torque (initlavg/max): (ft-Ibf) Reciprocating Time (Start -End). Recip Drag Up/Down: - (kip) SPM: Stroke Length: Fluid Name: CEMENT Fluids (i of 1) Slurry Type: CEMENT Purpose: PRIMARY Class: G -CLASS Description: LEAD SLURRY Density: 15.30 (ppg) Yield: 1.3100 (f-/sk) Mix Water Ratio: 6.106 (gallsk94) Excess: 20.00(%) Mix Method: BATCH Sacks Used: 136.70 (941b sacks) Water Volume: 19.9 (boil Excess Slurry Volume: 5.3 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 31.9 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 9.78 (ppg) PV: 9.00 (cp) YP: 28.000 (Ibf/100ft) Viscosity: 54.00 (s/qt) Gels 10 Sec: 17.000 (Ibf/100111 Gels 10 Min: 21.000 (IM/100W) Additives Name Type Amount Units Concentration Unit 0047 ANTIFOAM AGENT D085 DISPERSANT 0.200 GAL/SX 0.167 FLUID LOSS 1.300 %BWOC 0600 G GAS -BLOCK 0.100 %BWOC D183 CEMENT 1.500 GAL/SX D800 RETARDER AID 5.000 %BWOC 0.050 % IWOC urea O WZelr 3.50:01 PM Printed 8/2/2017 3:50:01 PM North America - ALASKA - BP Page 2ef9' Cementing Report Common Well Name: B-36 / 01 — __ _ Report no-.. 1 Report date'. 6/30/2017 Project: Prudhoe Bay _. _ —� Site: PB B P d - Spud Date/Time: 4/30/1896 Event Type: COM -ONSHORE (CON) _ _ Stolt Dete: 6/27/2017End Date APE No.: Contractor: NABORS ALASKA DRILLING INC. Rig Name/No.: CDR -2 I Rig Release: X3-018HL-C: (1,065.885.00) BPUOI', USA100000626 Active datum: KB @76.911(above Mean Sea Level) _ - Stag" Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud CirC. Top Bottom Plug Pressure Float Pressure Reurns Circulate Cmt Vol to Total Annular no. (usfl) (use) Rate Press. Plug Plug Bumped Bumped Held Held Prier Surface Mutl Lest Flow (gpm) (psi) lnsl) (min) (hr) (bbl) (bhq Atter 1 PRIMARY CEMENT 10,898.00 13,702.00 y y Pumping Bohai Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ, Bin static Pumped Diep, Rate TMD TMD Pmp date/time job Used temp. temp. (bhQ Rate (bbVmin) (usfl) (usfl) (scfj bbl/min Tests Casing Test Shoe Test Liner Top Test Test Pressure'. (psi) FIT/LOT: Wit) Liner Overlap: lush) Time. (min) Tool: N Positive Test: (Ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (Ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool. N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (us") Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N GET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Him Prior to Log: (hr) How Determined: Printed 8/2/2017 3:50:01 PM 21 7073 BA R 28413 Ta�U'&HESPRINT DISTRIBUTION LIST GE Company Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc. BP Exploration (Alaska) Inc. DATA LOGGED WELL NAME B -36A RECEIVE `B nslonlBlvd. Data Center, LR2-1 M. K BENDEq Anchorage, Alaska 99508 FIELD Prudhoe Bay Unit JUL 25 2017 toacknowledge recei tofthisdata. COUNTY PRUDHOE BAYGCCLOG TYPE BHI DISTRICT Alaska GR - RES LOG DATE June 27, 2017 AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(a_bakerhughes.com TODAYS DATE July 21, 2017 Revision STATUS Final Replacement: No Details: Rev. Requested by: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. 90X) PERSON ATTENTION V I BP North Slope. EOA, PBOC, PR&20 (Office 109) D&G WO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Atm: Ricky Elgarico ATO 3-344 700 G Street Anchorage, AK 99510 3 Exxon Mobil, Alaska Atm: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 FIELD 1 FINAL CD/DVD FINAL PRELIM(las, LOGS dlis, PDF, META, SURVEY I REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTSa ur rKilm # OF COPIES # OF COPIES I# OF COPIES 4 4 4 Z � lu 01 01 1 11 0 0 0 1 0 0 4 State of Alaska -AOGCC 0 1 1 7 0 Atm: Makans Bender 333 W. 7th Ave, Suite 100 .Anchorage, Alaska 99501 5 DNR- Division ofOil & Gas *** 0 0 1 1 0 Atm: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, IR24 900 E. Benson Blvd Anchorage, Alaska 99508 Attn: Gerardo Cedillo TOTALS FOR THIS PAGE: 0 2 4 4 0 by RECEIVED JUL 2 5 2017 A®GCC North America - ALASKA - BP Prudhoe Bay PB B Pad B-36 B -36A 500292266701 Design: B -36A Final Survey Report 28 June, 2017 21 7073 rias BAKER HUGHES 284"15 b Z p Company: NOMAmedca- ALASKA -BP Project: Prudhoe Bay Site: PB B Pad Well: B-36 Wellbore: B -36A Design: B -36A BP I/.RE Final Survey Report BAKER +N/ -S HUGHES Local Co-ordinate Reference: Well B-36 TVD Reference: ORIG KELLY BUSHING @ 76.9lusft (DOYON 16) MD Reference: ORIG KELLY BUSHING @ 76.9lusft (DOYON 16) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27'OGP-Usa AK/ Alaska zone 4[26734`1586, Using geodetic scale factor site PB B Pad, TR -11-14 ACTUAL Tie On Depth: Depth From (TVD) +N/ -S Site Position: Northing: 5,946,440.220 Usti Latitude: 70° 15' 36.475 N From: Map Easting: 662,094.050 usft Longitude: 148' 41'22.1143 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.23 ' g B-36, B-36 ACTUAL Tie On Depth: Depth From (TVD) +N/ -S II Position +N/.S 0.00 usti Northing: 5,950,114.740 usft Latitude: 70° 16'12.259 N .E/ -W 0.00 usti Easting: 663,733.740 usft Longitude: 148° 40'32+816 W rition Uncertainty 0.00 usft Wellhead Elevation: 43.23 usft Ground Level: 41.33 usft Wellbors, Magnetics Design Audit Notes: Version: Vertical Section: B -36A Model Name Sample Date Declination 1°I BGGM2016 7/1/2017 17.81 B -36A Dip Angle 1°) 80.99 Phase: ACTUAL Tie On Depth: Depth From (TVD) +N/ -S +EAW (usft) (uslt) (usft) 33.68 0.00 0.00 Field Strength (nT) 57,547 11,524.60 Direction (°) 74.94 6/282017 2: 17.30PM Page 2 COMPASS 5000.1 Build 81D Survey Program Date 6/28/2017 BP rER b pFinal To Survey Report BAKER (usft) (usft) Survey (Wellbom) Tool Name HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well B-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.9lusft (DOYON 16) Well: B-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EDM RSK- Alaska PROD -ANCP1 Survey Program Date 6/28/2017 From To (usft) (usft) Survey (Wellbom) Tool Name Description 100.00 6,050.00 Survey #2 (8-36) GYD-GC-MS Gyrodata gyrocompassing m/s 6,107.49 11,524.60 1 : MWD -Standard (B-36) MWD MWD - Standard 11,547.00 13,656.40 BHI CTK MWD (B -36A) MWD MWD -Standard Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easing DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 33.68 0.00 0.00 33.68 43.23 0.00 0.00 5,950,114.740 663,733.740 0.00 0.00 100.00 0.12 158.07 100.00 23.09 -0.06 0.03 5,950,114.676 663,733.767 0.18 0.01 110.00 0.11 158.30 110.00 33.09 -0.08 0.03 5,950,114.657 663,733.775 0.06 0.01 20" 200.00 0.06 162.42 200.00 123.09 -0.21 0.08 5,950,114.530 663,733.825 0.06 0.02 300.00 0.08 101.96 300.00 223.09 -0.28 0.16 5,950,114.468 663,733.911 0.07 0.09 400.00 0.37 86.91 400.00 32309 -0.27 0.56 5950,114.479 663,734.301 0.29 0.47 500.00 1.88 119.32 499.98 423.07 -106 2.31 5,950,113.732 663,736.071 1.58 1.95 600.00 3.47 118.84 599.87 522.96 -3.32 6.39 5,950,111.558 663,740.200 1.59 5.31 700.00 4.15 116.59 699.64 622.73 -6.40 12.28 5,950,108.608 663,746.152 0.70 10.1: 750.00 4.52 111.92 749.50 672.59 -7.95 15.72 5,950,107.138 663,749.630 1.02 13.12 800.00 4.99 108.54 799.33 722.42 -9.37 19.61 5,950,105.796 663,753.549 1.09 16.50 850.00 5.10 109.78 849.13 772.22 -10.82 23.76 5,950,104.443 663,757.733 0.31 20.14 900.00 5.42 106.98 898.92 822.01 -12.26 28.11 5,950,103.096 663,762.112 0.82 23.96 950.00 5.59 110.10 948.69 871.78 -13.79 32.66 5,950,101.669 663,766.689 0.69 27.96 1,000.00 5.98 114.56 998.44 921.53 -15.70 37.32 5,950,099.852 663,771.386 1.19 31.95 1,050.00 6.21 113.34 1,048.16 971.25 -17.86 42.17 5,950,097.804 663,776.283 0.53 36.08 1,100.00 6.77 121.35 1,097.84 1,020.93 -20.46 47.17 5,950,095.309 663,781.338 2.13 40.23 1,150.00 7.52 117.41 1,147.45 1,070.54 -23.50 52.59 5,950,092.388 663,786.824 1.79 44.68 1,200.00 8.19 122.90 1,196.98 1,120.07 -26.94 58.48 5,950,089.077 663,792.792 2.01 49.47 1,250.00 9.91 119.36 1,246.36 1,169.45 -30.99 65.22 5,950,085.180 663,799.618 3.61 54.93 6/28/2017 2:17:30PM Page 3 COMPASS 5000.1 Build BI D Survey BP EARN = p Final Survey Report BAKER �lEs1E5 Company: North America - ALASKA - BP Local Coordinate Reference: Well B-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Well: B-36 North Reference: True Wellborn B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (admuft) TVD TVDSS NIS ElW Northing Easting DLeg V. Sac (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 1,300.00 11.08 119.06 1,295.52 1,218.61 -35.43 73.17 5,950,080.911 663,807.663 2.34 61.45 1,350.00 12.15 119.03 1,344.49 1,267.58 40.32 81.97 5,950,076.217 663,816.567 2.14 68.61' 1,400.00 13.34 115.85 1,393.26 1,316.35 45.39 91.77 5,950,071.363 663,826.466 2.76 76.82 1,450.00 14.06 114.02 1,441.84 1,364.93 -50.37 102.51 5,950,066.611 663,837.310 1.68 85.90 1,500.00 14.74 112.20 1,490.27 1,413.36 -55.25 113.94 5,950,061.985 663,848.850 1.63 95.67 1,550.00 14.75 109.00 1,538.62 1,461.71 -59.73 125.85 5,950,057.770 663,860.851 1.63 106.01 1,600.00 15.60 107.18 1,586.88 1,509.97 -63.78 138.29 5,950,053.984 663,873.377 1.95 116.97 1,650.00 15.94 106.46 1,635.00 1,558.09 -67.72 151.30 5,950,050.336 663,886.466 0.78 128.51 1,700.00 16.41 107.13 1,683.02 1,606.11 -71.74 164.63 5,950,046.602 663,899.884 1.01 140.34 1,750.00 16.87 100.46 1,730.93 1,654.02 -75.14 178.52 5,950,043.507 663,913.839 3.93 152.86 1,800.00 16.98 100.58 1,778.76 1,701.85 -77.80 192.83 5,950,041.162 663,928.203 0.23 165.99 1,850.00 17.77 101.50 1,826.48 1,749.57 -80.66 207.48 5,950,038.620 663,942.915 1.67 179.40 1,900.00 19.47 96.97 1,873.86 1,796.95 -83.19 223.23 5,950;036:431 663,958.715 4.46 193.95 1,950.00 22.23 91.39 1,920.59 1,843.68 -84.43 240.97 5950,035.576 663,976.469 6.79 210.75 2,000.00 23.08 91.21 1,966.73 1,889.82 -84.87 260.22 5,950,035.558 663,995.726 1.71 229.23 2,050.00 22.08 90.56 2,012.90 1,935.99 -85.17 279.42 5,950,035.677 664,014.923 2.06 247.69 2,100.00 21.64 90.25 2,059.30 1,982.39 -85.30 298.03 5,950,035.950 664,033.536 0.91 265,6? 2,150.00 22.79 90.29 2,105.59 2,028.68 -85.39 316.94 5,950,036.272 664,052.436 2.30 283.86 2,200.00 25.05 90.45 2,151.29 2,074.38 -85.52 337.21 5,950,036.581 664,072.704 4.52 303.40 2,250.00 25.90 90.31 2,196.43 2,119.52 -85.66 358.71 5,950,036.906 664,094.206 1.70 324.13 2,300.00 26.05 90.84 2,241.38 2,164.47 -85.88 380.61 5,950,037.163 664,116.101 0.55 345.22 2,350.00 25.47 91.45 2,286.41 2,209.50 -86.32 402.34 5,950,037.203 664,137.829 1.28 366.09 2,400.00 25.58 92.04 2,331.53 2,254.62 -86.97 423.87 5,950,037.016 664,159.372 0.55 386.71 2,450.00 25.06 92.48 2,376.73 2,299.82 -87.81 445.24 5,950,036.639 664,180.751 1.11 407.13 2,500.00 25.53 93.83 2,421.94 2,345.03 -88.99 466.57 5,950,035.925 664,202.100 1.49 427.42 2,550.00 26.33 95.80 2,466.90 2,389.99 -90.83 488.35 5,950,034.559 664,223.916 2.35 447.98 2,600.00 27.02 96.04 2,511.58 2,434.67 -93.15 510.68 5,950,032.730 664,246.286 1.40 468.93 6/28/2017 2:17.30PM Page 4 COMPASS 5000.1 Build 81D ,Pit" BP EARN S_ % by Final Survey Report BAKER kI'HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB B Pad Well: B-36 Wellbore: B -36A Design: B -36A Survey MD (usft) 2,650.00 2,700.00 2,750.00 2,800.00 2,850.00 2,900.00 2,950.00 3,000.00 3,050.00 3,100.00 3,150.00 3,200.00 3,250.00 3,300.00 3,350.00 3,400.00 3,450.00 3,500.00 3,550.00 3,600.00 3,649.00 9513.1 3,650.00 3,700.00 3,750.00 3,800.00 3,850.00 Inc (1) 29.28 30.53 31.49 31.59 31.78 32.98 34.60 36.13 36.73 37.91 39.04 40.56 41.40 41.50 41.82 41.38 42.27 43.46 43.51 46.38 43.33 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well B-36 ORIG KELLY BUSHING @ 76.91usft (DOYON 16) ORIG KELLY BUSHING @ 76.91usft (DOYON 16) True Minimum Curvature EDM R5K- Alaska PROD - ANCP1 Azi (azimuth) TVD TVDSS NIS EM/ Northing 5,950,081.842 Eas0ng 6.22 DLeg V. Sec V) (usft) (usft) (usft) (usft) (usft) 5,950,087.210 (usft) 1.57 (°1100usft) (usft) 95.38 2,555.66 2,478.75 -95.49 534.15 5,950,030.900 5,950,092.484 664,269.801 1.16 4.56 490.9E 94.25 2,599.01 2,522.10 -97.58 558.99 5,950,029.353 5,950,097.672 664,294.678 0.14 2.74 514.43 93.23 2,641.86 2,564.95 -99.25 584.69 5,950,028.236 5,950,103.625 664,320.410 3.66 2.19 538.82 91.58 2,684.47 2,607.56 -100.35 610.82 5,950,027.707 664,346.555 1.74 563.77 91.15 2,727.02 2,650.11 -100.98 637.07 5,950,027.653 664,372.816 0.59 588.96 91.14 2,769.25 2,692.34 -101.51 663.84 5,950,027.701 664,399.590 2.40 614.67 90.70 2,810.80 2,733.89 -101.95 691.65 5,950,027.862 664,427.394 3.28 641.40 90.39 2,851.57 2,774.66 -102.23 720.58 5,950,028.217 664,456.328 3.08 669.27 89.01 2,891.80 2,814.89 -102.07 750.27 5,950,029.021 664,486.005 2.03 697.98 87.53 2,931.56 2,854.65 -101.15 780.57 5,950,030.600 664,516.273 2.96 727.48 86.48 2,970.71 2,893.80 -99.52 811.64 5,950,032.904 664,547.292 2.61 757.90 85.39 3,009.12 2,932.21 -97.25 643.56 5,950,035.872 664,579.156 3.34 789.32 84.06 3,046.87 2,969.96 -94.23 876.21 5,950,039.598 664,611.729 2.42 821.63 82.80 3,084.35 3,007.44 -90.44 909.09 5,950,044.100 664,644.516 1.68 854.36 82.34 3,121.70 3,044.79 -86.14 942.04 5.950.049.113 664,677.368 0.89 887.30 82.05 3,159.09 3,082.18 -81.64 974.93 5,950,054.335 664,710.149 0.96 920.25 81.90 3,196.35 3,119.44 -76.98 1,007.95 5,950,059.707 664,743.054 1.79 953.33 81.85 3,233.00 3,156.09 -72.17 1,041.62 5,950,065.245 664,776.610 2.38 987.09 82.03 3,269.28 3,192.37 -67.35 1,075.69 5,950,070.809 664,810.563 0.27 1,021.24 82.36 3,304.66 3,227.75 -62.56 1,110.68 5,950,076.363 664,845.439 5.76 1,056.28 82.24 3,339.39 3,262.48 -57.93 1,144.92 5,950,081.735 664,879.574 6.22 1,090.55 43.27 82.24 3,340.12 3,263.21 -57.84 1,145.60 5,950,081.842 664,880.251 6.22 1,091.23 44.05 82.36 3,376.29 3,299.38 -53.21 1,179.81 5,950,087.210 664,914.347 1.57 1,125.46 43.49 82.59 3,412.40 3,335.49 -48.68 1,214.10 5,950,092.484 664,948.528 1.16 1,159.75 43.56 82.57 3,448.65 3,371.74 -44.23 1,248.25 5,950,097.672 664,982.566 0.14 1,193.88 43.23 79.95 3,484.99 3,408.08 -39.02 1,282.19 5,950,103.625 665,016.389 3.66 1,228.02 628/2017 2: 1790PM Page 5 COMPASS 5000.1 Build 81D b BP /d Fla pFinal Survey Report BAKERER HUGHES Company: Project: Site: Well; Wellbore: Design: North America - ALASKA - BP Prudhoe Bay PB B Pad 8-36 B -36A B -36A Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well B-36 ORIG KELLY BUSHING @ 76.91usf1 (DOYON 16) ORIG KELLY BUSHING @ 76.9lusf1 (DOYON 16) True Minimum Curvature EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (ucft) (usft) (usft) Will) (usft) (usft) (°NOOusft) (waft) 3,900.00 43.20 79.20 3,521.43 3,444.52 -32.82 1,315.86 5,950,110.551 665,049.915 1.03 1,262.14 3,950.00 42.75 77.41 3,558.01 3,481.10 -25.92 1,349.24 5,950,118.181 665,083.129 2.60 1,296.1f 4,000.00 42.21 77.20 3,594.89 3,517.98 -18.50 1,382.18 5,950,126.315 665,115.898 1.12 1,329.90 4,050.00 42.72 77.29 3,631.77 3,554.86 -11.04 1,415.10 5,950,134.482 665,148.650 1.03 1,363.63 4,100.00 42.44 77.55 3,668.59 3,591.68 -3.67 1,448.12 5,950,142.567 665,181.498 0.66 1,397.43 4,150.00 43.78 78.00 3,705.09 3,628.18 3.56 1,481.52 5,950,150.525 665,214.725 2.75 1,431.56 4,200.00 43.12 78.19 3,741.39 3,664.48 10.65 1,515.16 5,950,158.348 665,248.207 1.35 1,465.89 4,250.00 43.11 78.35 3,777.89 3,700.98 17.60 1,548.62 5,950,166.021 665,281.505 0.22 1,500.01 4,300.00 43.06 78.80 3,814.40 3,737.49 24.37 1,582.10 5,950,173.513 665,314.825 0.62 1,534.09 4,350.00 43.28 79.04 3,850.87 3,773.96 30.94 1,615.67 5,950,180.815 665,348.242 0.55 1,568.22 4,400.00 42.91 78.80 3,887.38 3,810.47 37.50 1,649.19 5,950,188.107 665,381.613 0.81 1,602.30 4,450.00 43.16 78.70 3,923.93 3,847.02 44.16 1,682.66 5,950,195.490 665,414.924 0.52 1,636.34 4,500.00 43.03 78.78 3,960.44 3,883.53 50.83 1,716.16 5,950,202.887 665,448.272 0.28 1,670.43 4,550.00 42.95 78.97 3,997.01 3,920.10 57.41 1,749.62 5,950,210.191 665,481.571 0.30 1,704.44 4,600.00 42.76 79.18 4,033.66 3,956.75 63.86 1783.01 5,950,217.362 665,514.818 0.44 1,738.37 4,650.00 42.34 79.18 4,070.49 3,993.58 70.20 1,816.23 5,950,224.431 665,547.886 0.88 1,772.09 4,700.00 42.36 79.20 4,107.44 4,030.53 76.52 1,849.31 5,950,231.466 665,580.824 0.05 1,805.6A 4,750.00 41.75 79.30 4,144.57 4,067.66 82.77 1,882.22 5,950,238.427 665,613.582 1.23 1,839.08 4,800.00 42.07 79.52 4,181.77 4,104.86 88.91 1,915.05 5,950,245.277 665,646.268 0.70 1,872.38 4,650.00 41.49 79.76 4,219.06 4,142.15 94.90 1,947.82 5,950,251.979 665,676.898 1.20 1,905.58 4,900.00 42.38 80.18 4,256.26 4,179.35 100.72 1,980.72 5,950,258.512 665,711.665 1.87 1,938.86 4,950.00 42.58 80.45 4,293.13 4,216.22 106.40 2,014.01 5,950,264.915 665,744.816 0.54 1,972.48 5,000.00 42.39 80.49 4,330.00 4,253.09 111.99 2,047.31 5,950,271.228 665,777.988 0.38 2,006.09 5,050.00 42.14 80.72 4,367.01 4,290.10 117.48 2,080.49 5,950,277.438 665,811.035 0.59 2,039.56 5,100.00 41.56 81.18 4,404.25 4,327.34 122.73 2,113.43 5,950,283.401 665,843.854 1.31 2,072.73 5,150.00 41.91 81.03 4,441.56 4,364.65 127.87 2,146.32 5,950,289.261 665,876.616 0.73 2,105.82 5,200.00 42.87 80.79 4,478.49 4,401.58 133.20 2,179.60 5,950,295.310 665,909.775 1.95 2,139.35 6282017 2: IT.30PM Page 6 COMPASS 5000.1 Build BID Survey Z by Final Survey Report BAKER ,2 s►N HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well B-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING (off 76.9lusft (DOYON 16) Well: B-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azt(azimuth) TVD T/DSS NIS PJW Northing Beating DLeg V. Seo (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°AOOusft) (usft) 5,250.00 43.55 80.62 4,514.93 4,438.02 138.73 2,213.38 5,950,301.573 665,943.428 1.38 2,173.41 5,300.00 43.07 80.67 4,551.31 4,474.40 144.30 2,247.22 5,950,307.882 665,977.138 0.96 2,207.54 5,350.00 43.23 80.80 4,587.79 4,510.88 149.81 2,280.97 5,950,314.120 666,010.757 0.37 2,241.56 5,400.00 43.23 81.16 4,624.22 4,547.31 155.18 2,314.80 5,950,320.223 666,044.453 0.49 2,275.61 5,450.00 42.89 81.63 4,660.76 4,583.85 160.29 2,348.55 5,950,326.064 666,078.085 0.94 2,309.54 5,500.00 42.49 82.46 4,697.51 4,620.60 164.98 2,382.13 5,950,331.486 666,111.547 1.38 2,343.18 5,550.00 42.33 82.71 4,734.42 4,657.51 169.33 2,415.56 5,950,336.564 666,144.882 0.46 2,376.60 5,600.00 42.56 82.40 4,771.32 4,694.41 173.70 2,449.02 5,950,341.663 666,178.236 0.62 2,410.04 5,650.00 43.53 81.47 4,807.86 4,730.95 178.49 2,482.81 5,950,347.187 666,211.911 2.32 2,443.92 5,700.00 43.58 81.69 4,844.10 4,767.19 183.54 2,516.89 5,950,352.972 666,245.872 0.32 2,478.14 5,750.00 43.36 82.06 4,880.38 4,803.47 188.40 2,550.95 5,950,358.573 666,279.809 0.67 2,512.29 5,800.00 43.82 81.49 4,916.60 4,839.69 193.33 2,585.07 5,950,364.246 666,313.611 1.21 2,546.52 5,850.00 43.59 79.69 4,952,75 4,875.84 198.98 2,619.15 5,950,370.632 666,347.757 2.53 2,580.89 5,900.00 43.68 80.11 4,988.93 -4,912.02 205.03 2,653.12 5,950,377.420 666,381.583 0.61 2,615.27 5,950.00 44.65 81.12 5,024.80 - 4,947.89 - 210.71 2,687.48 - 5,950,383.844 666,415.819 2.40 2,649.93 6,000.00 45.14 82.49 5,060.22 4,983.31 215.74 2,722.41 5,950,389.630 666,450.627 2.17 2,684.97 6,050.00 45.18 82.90 5,095.48 5,018.57 220.24 2,757.58 5,950,394.902 666,465.684 0.59 2,720.09 6,107.49 46.60 81.80 5,135.49 5,058.58 225.74 2,798.49 5,950,401.289 666,526.460 2.83 2,761.03 6,202.96 46.10 81.70 5,201.39 5,124.48 235.66 2,866.85 5,950,412.686 666,594.588 0.53 2,829.62 6,298.62 45.40 78.50 5,268.15 5,191.24 247.42 2,934.34 5,950,425.917 666,661.796 2.51 2,897.84 6,393.20 46.00 79.20 5,334.21 5,257.30 260.51 3,000.75 5,950,440.445 666,727.903 0.83 2,965.37 6,489.02 46.20 78.20 5,400.65 5,323.74 274.04 3,068.45 5,950,455.443 666,795.291 0.78 3,034.27 6,584.86 45.40 75.60 5,467.47 5,390.56 289.60 3,135.36 5,950,472.453 666,861.843 2.12 3,102.92 6,680.64 44.40 74.50 5,535.31 5,458.40 307.03 3,200.68 5,950,491.304 666,926.762 1.32 3,170.53 6,776.28 42.70 74.00 5,604.63 5,527.72 324.92 3,264.10 5,950,510.559 666,989.773 1.81 3,236.42 6,871.83 42.40 74.50 5,675.02 5,598.11 342.46 3,326.29 5,950,529.446 667,051.560 0.47 3,301.02 6,967.59 42.30 74.00 5,745.79 5,668.88 359.97 3,388.37 5,950,548.302 667,113.247 0.37 3,365.53 612812017 2: 17.30PM Page 7 COMPASS 5000.1 Build 81D ice? BP Final Survey Report FORM HUGHES HUGHES Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB B Pad Local Co-ordinate Reference: TVD Reference: MD Reference: Well B-36 ORIG KELLY BUSHING @ 76.9lusft (DOYON 16) ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) Well: 8-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EDM RSK- Alaska PROD -ANCP7 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E1W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) ('HOOusft) (usft) 7,063.40 42.30 73.60 5,816.66 5,739.75 377.95 3,450.30 5,950,567.633 667,174.758 0.28 3,430.00 7,137.88 42.40 74.30 5,871.70 5,794.79 391.83 3,498.51 5,950,582.549 667,222.659 0.65 3,480.1f 7,230.84 42.40 75.70 5,940.35 5,863.44 408.05 3,559.06 5,950,600.083 667,262.832 1.02 3,542.84 7,326.46 42.40 77.00 6,010.96 5,934.05 423.26 3,621.71 5,950,616.657 667,345.134 0.92 3,607.30 7,422.05 42.50 79.10 6,081.50 6,004.59 436.62 3,684.82 5,950,631.382 667,407.937 1.49 3,671.71 7,517.87 42.10 79.60 6,152.37 6.075.46 448.54 3,748.20 5,950,644.676 667,471.035 0.55 3,736.01 7,614.01 41.80 79.80 6,223.87 6.146.96 460.03 3,811.43 5,950,657.539 667,533.998 0.34 3,800.06 7,708.33 42.90 80.10 6,293.58 6,216.67 471.12 3,874.00 5,950,669.983 667,596.301 1.19 3,863.35 7,804.11 43.00 79.60 6,363.68 6,286.77 482.62 3,938.23 5,950,682.878 667,660.270 0.37 3,928.37 7,898.85 42.90 79.60 6,433.03 6,356.12 494.27 4,001.73 5,950,695.908 667,723.489 0.11 3,992.71 7,995.28 42.60 80.10 6,503.84 6,426.93 505.81 4,066.16 5,950,708.842 667,787.650 0.47 4,057.93 8,089.95 42.10 79.40 6,573.80 6,496.89 517.15 4,128.91 5,950,721.550 667,850.140 0.73 021.48 8,183.96 41.10 78.90 6,644.10 6,567.19 528.90 4190.21 5,950,734.626 667,911.165 1.12 4,183.72 8,280.93 40.80 78.70 6,717.34 6,640.43 541.24 4,252.56 5,950,748.323 667,973.221 0.34 4,247.13 8,376.10 41.30 78.90 6,789.11 6,712.20 553.38 4,313.87 5,950,761.791 668,034.248 0.54 4,309.49 8,471.71 41.60 79.60 6,860.78 6,783.87 565.19 4,376.05 5,950,774.944 668,096.151 0.58 4,372.60 8,567.02 42.60 80.10 6,931.49 6,854.58 576.44 4,438.94 5,950,787.567 668,158.785 1.11 4,436.2f 8,662.66 43.50 81.20 7,001.38 6,924.47 587.05 4,503.36 5,950,799.566 668,222.953 1.23 4,501.22 8,758.51 43.10 81.00 7,071.14 6,994.23 597.21 4,568.31 5,950,811.145 668,287.656 0.44 4,566.58 8,854.50 42.70 81.40 7,141.46 7,064.55 607.21 4,632.88 5,950,822.544 668,351.991 0.50 4,631.53 8,949.28 42.30 81.90 7,211.34 7,134.43 616.51 4,696.23 5,950,833.219 668,415.122 0.55 4,695.12 9,045.13 41.60 80.10 7,282.63 7,205.72 626.53 4,759.51 5,950,844.608 668,478.165 1.45 4,758.83 9,140.85 41.30 81.00 7,354.37 7,277.46 636.93 4,822.01 5,950,856.369 668,540.422 0.70 4,621.89 9,235.03 40.80 79.10 7,425.40 7,348.49 647.61 4,882.93 5,950,868.372 668,601.085 1.43 4,883.49 9,331.31 41.70 78.70 7,497.78 7,420.87 659.84 4,945.22 5,950,881.946 668,663.093 0.97 4,946.82 9,421.19 41.20 78.40 7,565.15 7,488.24 671.65 5,003.53 5,950,895.022 668,721.131 0.60 5,006.20 9,522.31 41.20 78.00 7,641.24 7,564.33 685.27 5,068.73 5,950,910.056 668,786.014 0.26 5,072.70 6/28/2017 2: 17'30PM Page 8 COMPASS 5000.1 Build 81D bp BP //.R\ Z. S Final Survey Report BAKER HUGHES Company: North America- ALASKA - BP Local Co-ordinate Reference: Well B-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 76.9lusft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Well: B-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S ENV Northing Easting Dl -eq V. Sec (usft) (1) V) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 9,617.08 42.20 78.70 7,712.00 7,635.09 697.99 5,130.48 5,950,924.122 668,847.462 1.16 5,135.65 9,712.26 42.80 78.20 7,782.17 7,705.26 710.87 5,193.48 5,950,938.365 668,910.163 0.72 5,199.81 9,807.98 41.90 78.20 7,852.91 7,776.00 724.06 5,256.60 5,950,952.92D 668,972.976 0.94 5,264.19 9,903.58 41.20 79.10 7,924.46 7,847.55 736.54 5,318.76 5,950,966.751 669,034.851 0.96 5,327.46 9,998.99 41.80 80.30 7,995.91 7,919.00 747.84 5,380.96 5,950,979.400 669,096.786 1.04 5,390.46 10,094.94 _ 42.80 80.80 8,066.88 7,989.97 758.44 5,444.66 5,950,991.382 669,160.235 1.10 5,454.72 10,190.36 42.30 81.00 8,137.18 8,060.27 768.64 5,508.37 5,951,002.970 669,223.707 0.54 5,518.90 10,285.97 41.10 81.20 8,208.56 6,131.65 778.48 5,571.21 5,951,014.175 669,286.309 1.26 5,582.14 10,381.59 41.40 81.20 8,280.45 8,203.54 788.13 5,633.51 5,951,025.173 669,348.385 0.31 5,644.81 10,477.61 43.20 80.00 8,351.47 8,274.56 798.70 5,697.26 5,951,037.122 669,411.883 2.05 5,709.11 10,572.69 42.50 80.30 8,421.32 8,344.41 809.78 5,761.10 5,951,049.593 669,475.465 0.77 5,773.64 10,669.76 42.50 80.80 8,492.74 8,415.83 820.53 5,825.66 5,951,061739 669,539.767 0.35 5,838.77 10,748.92 42.80 81.00 8,550.96 8,474.05 829.01 5,878.62 ;5,951,071.371 669,592.524 0.42 5,892.11 10,798.90 41.90 80.50 8,587.90 8,510.99 834.42 5,911.85 5,951,077.503 669,625.627 1.92 5,925.61 10,823.00 42.34 80.28 8,605.78 8,528.87 837.12 5,927.78 5,951,080.547 669,641.500 1.93 5,941.70 7.. 10,831.74 42.50 80.20 8,612.23 8,535.32 838.12 5,933.59 5,951,081.673 669,647.287 1.93 5,947.57 10,862.59 45.30 80.00 8,634.46 8,557.55 841.80 5,954.67 5,951,085.808 669,668.271 9.09 5,968.87 10,892.61 49.30 79.20 8,654.81 8,577.90 845.78 5,976.36 5,951,090.265 669,689.872 13.47 5,990.86 10,922.15 52.40 80.00 8,673.46 8,596.55 849.91 5,998.89 5,951,094.886 669,712.304 10.70 6,013.69 10,954.09 56.40 80.00 8,692.05 8,615.14 854.42 6,024.46 5,951,099.949 669,737.769 12.52 6,039.55 10,985.89 59.10 78.60 8,709.02 8,632.11 859.42 6,050.88 5,951,105.520 669,764.074 9.27 6,066.36 11,017.23 62.80 75.80 8,724.23 8,647.32 865.50 6,077.59 5,951,112.179 669,790.639 14.15 6,093.73 11,048.41 65.60 73.20 8,737.80 8,660.89 873.01 6,104.63 5,951,120.272 669,817.511 11.70 6,121.80 11,081.28 67.50 69.30 8,750.89 8,673.98 882.70 6,133.17 5,951,13D.587 669,645.835 12.32 6,151.88 11,110.52 67.90 64.80 8,761.99 8,685.08 893.25 6,158.08 5,951,141.672 669,870.501 14.30 6,178.67 11,145.04 67.20 60.30 8,775.18 8,698.27 907.95 6,186.38 5,951,156.983 669,898.476 12.22 6,209.62 6/282017 2.17.30PM Page 9 COMPASS 5000.1 Build 81D 'sem` p BP Final Survey Report WE Fag BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PS B Pad Well: B-36 Wellbore: B -36A Design: B -36A Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well B-36 ORIG KELLY BUSHING @ 76.9lusft (DOYON 16) ORIG KELLY BUSHING @ 76.9lusft (DOYON 16) True Minimum Curvature EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS PJW Northing Easting DLeg V. See (usft) (°) (°) (usft) (usft) (usft) (weft) (usft) (usft) (°/100usft) (usft) 11,182.25 66.70 54.10 8,789.76 8,712.85 926.48 6,215.14 5,951,176.136 669,926.826 15.39 6,242.41 11,214.22 66.70 53.60 8,802.40 8,725.49 943.80 6,238.85 5,951,193.967 669,950.154 1.44 6,269.8f 11,245.14 66.20 52.90 8,814.76 8,737.85 960.76 6,261.57 5,951,211.415 669,972.489 2.63 6,296.14 11,276.01 65.70 53.50 8,827.34 8,750.43 977.65 6,284.14 5,951,228.787 669,994.687 2.40 6,322.33 11,306.33 65.70 53.30 8,839.82 8,762.91 994.13 6,306.32 5,951,245.741 670,016.507 0.60 6,348.03 11,337.90 65.60 52.50 8,852.83 8,775.92 1,011.47 6,329.26 5,951,263.583 670,039.062 2.33 6,374.69 11,369.82 65.70 52.50 8,865.99 8,789.08 1,029.18 6,352.33 5,951,281.763 670,061.741 0.31 6,401.57 11,401.98 65.40 52.20 8,879.30 8,802.39 1,047.06 6,375.51 5,951,300.164 670,084.524 1.26 6,428.60 11,425.50 65.90 51.80 8,889.00 8,812.09 1,060.25 6,392.40 5,951,313.720 670,101.117 2.63 6,448.33 11,463.17 67.20 46.20 8,904.00 8,827.09 1,082.46 6,418.86 5,951,336.501 670,127.090 9.42 6,479.66 11,494.82 70.10 41.80 8,915.53 6,838.62 1,103.30 6,439.68 5,951,357.788 670,147.447 20.94 6,505.17 11,524.60 73.80 36.20 8,924.76 8,847.85 1,125.30 6,457.47 5,951,380.167 670,164.759 21.77 6,528,08 TIP 11,547.00 75.21 32.88 8,930.75 8,853.84 1,143.08 6,469.71 5,951,398.207 670,176.603 15.61 6,544.51 KOP-TOWS 11,550.00 74.70 32.55 8,931.52 8,854.61 1,145.52 6,471.27 5,951,400.678 670,178.115 20.00 6,546.66 4112' 11,570.18 71.31 30.26 8,937.42 8,860.51 1,161.99 6,481.33 51951,417.358 670,187.811 20.00 6,560.6, Interpolated Azimuth 11,600.30 66.56 26.71 8,948.25 8,871.34 1,186.67 6,494.74 5,951,442.328 670,200.680 19.22 6,580.01 Interpolated Azimuth 11,630.12 63.33 22.99 8,960.88 8,883.97 1,211.17 6,506.10 5,951,467.067 670,211.503 15.65 6,597.34 Interpolated Azimuth 11,660.21 59.99 18.97 8,975.16 8,898.25 1,235.88 6,515.59 5,951,491.977 670,220.454 16.17 6,612.93 11,680.94 56.33 22.29 8,986.10 8,909.19 1,252.36 6,521.79 5,951,508.585 670,226.286 22.29 6,623.19 11,710.61 59.02 27.59 9,001.97 8,925.06 1,275.07 6,532.37 5,951,531.521 670,236.370 17.60 6,639.31 11,740.80 65.78 32.64 9,015.96 8,939.05 1,298.17 6,545.81 5,951,554.907 670,249.305 26.84 6,658.29 11,770.28 68.60 37.42 9,027.39 8,950.48 1,320.41 6,561.41 5,951,577.474 670,264.417 17.74 6,679.13 6282017 2:17.30PM Page 10 COMPASS 5000 1 Build 81D bBP I p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well B-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.9lusft (DOYON 16) Well: 8-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: 8-36A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Seo (usft) (°) (°) (usft) (usft) (usft) lust[) (usft) (usft) (°1100usft) (usft) 11,800.58 71.15 43.41 9,037.82 8,960.91 1,342.05 6,579.65 5,951,599.507 670,282.382 20.38 6,702.57 11,830.22 75.04 48.13 9,046.45 8,969.54 1,361.81 6,600.17 5,951,619.706 670,302.265 20.11 6,727.32 11,860.08 80.22 53.51 9,052.85 8,975.94 1,380.21 6,822.77 5,951,638.594 670,324.458 24.71 6,753.93 11,890.44 87.36 55.85 9,056.13 8,979.22 1,397.65 6,647.38 5,951,656.558 670,348.683 24.73 6,782.22 11,920.06 92.49 59.62 9,056.17 8,979.26 1,413.45 6,672.41 5,951,672.901 670,373.365 21.49 6,810.50 11,949.92 99.47 62.68 9,053.06 8,976.15 1,427.77 6,698.40 5,951,687.786 670,399.035 25.50 6,839.32 11,981.53 98.46 68.01 9,048.13 8,971.22 1,440.79 6,726.77 5,951,701.417 670,427.110 16.96 6,870.10 12,016.15 91.29 71.16 9,045.19 8,968.28 1,452.81 6,759.08 5,951,714.134 670,459.144 22.61 6,904.41 12,041.06 91.32 74.91 9,044.62 8,967.71 1,460.08 6,782.89 5,951,721.915 670,482.794 15.05 6,929.30 12,070.75 88.62 77.84 9,044.64 8,967.73 1,467.07 6,811.74 5,951,729.533 670,511.482 13.42 6,958.97 12,101.10 88.77 83.79 9,045.33 8,968.42 1,471.91 6,841.68 5,951,735.024 670,541.307 19.61 6,989.14 12,130.68 90.46 62.94 9,045.53 8,968.62 1,475.33 6,871.06 5,951,739.080 670,570.603 6.40 7,018.40 12,159.98 91.81 79.35 9,044.95 8,968.04 1,479.84 6,900.00 5,951,744.216 670,599.436 13.09 7,047.52 12,190.16 90.89 76.65 9,04423 8,967.32 1,486.11 6,929.51 5,951,751.129 670,628.800 9.45 7,077.65 12,223.18 89.97 72.68 9,043.99 8,967.08 1,494.84 6,961.35 5,951,760.549 670,660.437 12.34 7,110.66 12,253.01 89.32 69.60 9,044.17 8,967.26 1,504.48 6,989.57 5,951,770.802 670,688.443 10.55 7,140.42 12,282.17 88.65 66.64 9,044.69 8,967.78 1,515.34 7,016.62 5,951,782.251 670,715.250 10.41 7,169.36 12,310.80 88.40 63.80 9,045.42 8,968.51 1,527.34 7,042.60 5,951,794.607 670,740.964 9.95 7,197.57 12,340.52 89.35 61.73 9,046.01 8,969.10 1,540.94 7,069.02 5,951,808.975 670,767.079 7.66 7,226.61 12,372.39 90.18 58.41 9,046.14 8,969.23 1,556.83 7,096.64 5,951,825.469 670,794.340 10.74 7,257.41 12,404.37 89.20 54.76 9.046.31 8,969.40 1,574.44 7,123.33 5,951,843.652 670,820.637 11.82 7,287.76 12,430.65 90.18 52.64 9,046.45 8,969.54 1,590.00 7,144.50 5,951,859.665 670,841.470 8.89 7,312.25 12,460.46 89.14 51.40 9,046.63 8,969.72 1,608.34 7,168.00 5,951,878.514 670,864.560 5.43 7,339.71 12,490.52 90.43 45.22 9,046.74 8,969.83 1,628.33 7,190.44 5,951,898.979 670,886.554 21.00 7,366.56 12,520.89 91.63 42.22 9,046.20 8,969.29 1,650.27 7,211.42 5,951,921.371 670,907.054 10.64 7,392.53 12,550.88 91.90 38.97 9,045.27 8,968.36 1,673.03 7,230.92 5,951,944.547 670,926.056 10.87 7,417.27 12,580.60 90.12 35.80 9,044.75 8,967.84 1,696.63 7,248.96 5,951,968.539 670,943.576 12.23 7,440.83 6282017 2:1730PM Page 11 COMPASS 5000.1 Build 81D Survay BP IGFlu Zit Final Survey Report HUGHES HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well B-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Site: PB 8 Pad MD Reference: ORIG KELLY BUSHING (off 76.91usft (DOYON 16) Well: 8-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EDM RSK- Alaska PROD -ANCP1 Survay MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (uaft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usR) (usft) 12,610.98 90.34 31.81 9,044.63 8,967.72 1,721.87 7,265.86 5,951,994.138 670,959.921 13.15 7,463.70 12,640.50 90.49 28.98 9,044.41 8,967.50 1,747.33 7,280.79 5,952,019.914 670,974.296 9.60 7,484.7 12,670.38 91.14 23.91 9,043.99 8,967.08 1,774.07 7,294.10 5,952,046.937 670,987.011 17.10 7,504.53 12,700.55 90.15 19.84 9,043.65 8,966.74 1,802.06 7,305.33 5,952,075.163 670,997.637 13.88 7,522.66 12,730.51 90.28 15.79 9,043.54 8,966.63 1,830.58 7,314.50 5,952,103.871 671,006.178 13.52 7,538.92 12,760.35 93.41 18.03 9,042.58 8,965.67 1,859.11 7,323.17 5,952,132.580 671,014.227 12.90 7,554.70 12,790.71 93.75 22.13 9,040.68 8,963.77 1,887.56 7,333.57 5,952,161.251 671,024.006 13.52 7,572.14 12,820.31 91.29 25.71 9,039.38 8,962.47 1,914.59 7,345.56 5,952,188.528 671,035.402 14.66 7,590.74 12,850.97 91.14 29.17 9,038.73 8,961.82 1,941.79 7,359.68 5,952,216.027 671,048.930 11.29 7,611.44 12,881.65 93.66 32.34 9,037.44 8,960.53 1,968.13 7,375.35 5,952,242.697 671,064.023 13.19 7,633.42 12,912.00 94.89 36.08 9,035.18 8,958.27 1,993.15 7,392.37 5,952,268.084 671,080.486 12.94 7,656.35 12,940.57 94.06 37.40 9,032.95 8,956.04 2,015.97 7,409.40 5,952,291.272 671,097.022 5.45 7,678.73 12,970.52 91.75 39.25 9,031.43 8,95452 2,039.44 7,427.95 5,952,315.131 671,115.053 9.88 7,702.74 13,000.82 90.21 43.39 9,030.91 8,954.00 2,062.18 7,447.95 5,952,338.306 671,134.550 14.58 7,727.96 13,030.25 89.69 47.84 9,030.94 8954.03 2,082.76 7,468.98 5,952,359.338 671,155.123 15.22 7,753.61 13,061.08 87.60 49.54 9,031.67 8,954.76 2,103.11 7,492.12 5,952,380.179 671,177.822 8.74 7,781.25 13,090.80 89.08 51.74 9,032.53 8,955.62 2,121.95 7,515.09 5,952,399.512 671,200.373 8.92 7,808.3: 13,120.75 90.74 55.24 9,032.58 8,955.67 2,139.76 7,539.16 5,952,417.845 671,224.046 12.93 7,836.20 13,150.91 93.81 57.92 9,031.38 8,954.47 2,156.36 7,564.31 5,952,434.983 671,248.825 13.51 7,864.79 13,180.14 98.13 60.66 9,028.34 8,951.43 2,171.20 7,589.29 5,952,450.366 671,273.479 17.47 7,892.78 13,210.83 102.02 62.11 9,022.97 8,946.06 2,185.67 7,615.81 5,952,465.408 671,299.675 13.50 7,922.14 13,240.52 104.84 64.19 9,016.08 8,939.17 2,198.72 7,641.57 5,952,479.008 671,325.143 11.69 7,950.41 13,271.06 .109.97 67.64 9,006.94 8,930.03 2,210.61 7,668.16 5,952,491.481 671,351.462 19.96 7,979.17 13,300.39 112.03 70.99 8,996.43 8,919.52 2,220.29 7,693.77 5,952,501.710 671,376.852 12.77 8,006.42 13,335.72 111.51 76.48 8,983.32 8,906.41 2,229.47 7,725.25 5,952,511.574 671,408.125 14.50 8,039.20 13,365.24 108.80 79.50 8,973.14 8,896.23 2,235.23 7,752.35 5,952,517.921 671,435.093 13.28 8,066.87 13,390.64 108.54 83.77 8,965.01 8,888.10 2,238.73 7,776.15 5,952,521.936 671,458.810 15.96 8,090.76 6128/2017 2.17.30PM Page 12 COMPASS 5000.1 Build 81D Z. _r �� Final BF Survey Repot US Fag AKER HUGHES Company: North Amenca - ALASKA - BP Local Coordinate Reference: Well B-36 Project: Prudhoe Bay ND Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) Well: 8-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 13,421.04 109.73 89.46 8,955.04 8,878.13 2,240.43 7,804.80 5,952,524.259 671,487.419 18.11 8,118.87 13,450.37 110.29 94.49 8,944.99 8,868.08 2,239.48 7,832.34 5,952,523.911 671,514.964 16.23 8,145.21 13,480.21 109.61 99.92 8,934.81 8,857.90 2,235.96 7,860.15 5,952,520.998 671,542.846 17.26 8,171.16 13,510.18 109.32 103.95 8,924.82 8,847.91 2,230.12 7,887.79 5,952,515.758 671,570.604 12.71 8,196.33 13,535.16 109.93 103.04 8,916.43 8,839.52 2,224.63 7,910.67 5,952,510.767 671,593.595 4.21 8,217.00 13,570.26 111.95 103.52 8,903.88 8,826.97 2,217.10 7,942.57 5,952,503.934 671,625.653 5.89 8,245.85 13,602.40 113.76 100.14 8,891.40 8,814.49 2,211.02 7,971.55 5,952,498.490 671,654.756 11.21 8,272.25 13,635.31 113.47 99.44 8,878.21 8,801.30 2,205.90 8,001.27 5,952,494.011 671,684.573 2.14 6,299.62 13,656.40 112.19 99.39 8,870.03 8,793.12 2,202.72 8,020.44 5,952,491.249 671,703.812 6.07 8,317.31 13,697.OD 112.19 99.39 8,854.70 8,777.79 2,196.58 8,057.53 5,952,485.925 671,741.023 0.00 8,351.53 2 718" 13,702.00 112.19 99.39 8,852.81 8,775.90 2,195.83 8,062.10 5,952,485.269 671,745.606 0.00 8,355.74 Projection to 7D Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 13,697.00 8,854.70 27/8' 2.875 4.250 11,550.00 8,931.52 4117' 4.500 7.000 6/282017 2A7:30PM Page 13 COMPASS 5000.1 Build 81D z by BP Was Final Survey Report Z_ HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well B-36 Project Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Well: B-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A Database: EDM RSK-Alaska PROD -ANCP1 Design Annotations Measured Vertical Local Coordinates Depth Depth .NI -S +E1 -W (usft) (usft) (usft) (usft) Comment 11,524.60 8,924.76 1,125.30 6,457.47 TIP 11,547.00 8,930.75 1,143.08 6,469.71 KOP-TOWS 11,570.18 8,937.42 1,161.99 6,481.33 Interpolated Azimuth 11,600.30 8,948.25 1,186.67 6,494.74 Interpolated Azimuth 11,630.12 8,960.88 1,211.17 6,506.10 Interpolated Azimuth 13,702.00 8,852.81 2,195.83 8,062.10 Projection to TO Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes 6/28@017 2 17,30PM Page 14 COMPASS 5000.1 Build 61D THE STATE °fALASKA GOVERNOR BILL WALKER John Egbejimba Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 west Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.aloska.gov Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B -36A BP Exploration (Alaska), Inc. Permit to Drill Number: 217-073 Surface Location: 4751' FSL, 1894' FEL, SEC. 31, TI IN, R14E, UM Bottomhole Location: 1686' FSL, 930' FWL, SEC. 28, TI IN, R14E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this L�day of June, 2017. STATE OF ALASKA -ASKA OIL AND GAS CONSERVATION COMMISE PERMIT TO DRILL 20 AAC 25.005 1a. Type of Work: 1b. Proposed Well Class: Exploratory -Gas ❑ Service -WAG ❑ Service - Disp❑ 1c. Specify if well is proposed for: Drill El Lateral ❑ Stratigmphic Test ❑ Development - Oil O- Service-Winj ❑ Single Zone Ri• lExplomtDry-Oil Coalbed Gas ❑ Gas Hydrates❑ Redrill ®• Reentry ❑ ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket IZ ' Single Well ❑ 11. Well Name and Number. BP Exploration (Alaska), Inc RECEiVon Bond No. 295105380 • PBU B -36A 3 Address: 6. Proposed Depth: 12. Field/Pool(s): !, C MAY U 5 29 P.O. Box 196612 Anchorage, AK 99519-6612 MD: 13672' • TVD: 8785ss PRUDHOE BAY, PRUDHOE OIL - 4a. Location of Well (Governmental Section). AOG11 ` 7. Property Designation (Lease Number): 1'e�y ADL 028310 & 028309 - Surface: 4751' FSL, 1894' FEL, Sec. 31, T11N, R14E, UM 8 Land Use Permit. 13. Approximate spud date: Top of Productive Horizon: 338 FSL, 4030' FWL, Sec. 29, T1 IN, R14E, UM 89-034 July 1, 2017 . Total Depth: 1686' FSL, 930' FWL, Sec. 28, T11 N, R14E, UM 9. Acres in Property: 2491 & 2560 14. Distance to Nearest Property: 7158 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 76.91- feet 15. Distance to Nearest Well Open Surface: x- 663734 - y- 5950115 • Zone - ASP 4 GL Elevation above MSL: 42.3 - feet to Same Pool: 7 16. Deviated wells: Kickoff Depth: 11550 • feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 110 degrees Downhole: 3318 ' Surface: 2421 18. Casing Program: Specifications Top - Setfng Depth - Bottom Cement Quantity, c.f. or sacks Hole Casin Weight Grade Cou lin Len h MD TVD TVD includin stage data 4-1/2" 3-1/2"x31/4" 9.3#/6.5# 13Cr85 STL/TCIt 2671' 11000' 8642',, 13671• 8785',, 140 sx Class'G' z2-7/8" /6.4# ISTI 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (f): Plugs'assured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 12691 9095 12400 12400 9037 12580 Casing Length size Cement Volume MD TVD Conductor/Structural 78 20' 260 ax Arctic Set (Approx.) 36-114 36-114 Surface 3613 9-5/8" 1375 sx CS III, 335 sx Class'G% 300 sx CS II 36-3649 36-3340 Intermediate 10790 7" 225 sx Class'G' 33-10823 33-8609 Production Liner 2077 4-1/7 236 sx Class'G' 10614 -12691 8455-9095 Perfomtion Depth MD (ft): 11590 -12520 Perforation Depth TVD (ft): 8943-9053 20. Attachments Property Plat ❑ BOP Sketch ® Drilling Program ® Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program ® 20 AAC 25.050 requirements m 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Ciolkosz, Ryan R from without prior written approval. Email Ryan.Ciolkoszabp.com Printed Name John Egbejimba Title Engineering Team Leader- CTD & RWO Signature Phone +1 907 564 4139 Date 5 $ Commission use Use Only PermiNumb r: Drill_ 73 Number: 7 API Number: 50- 029-22667-01-00 Permit Approval Dere: See cover letter for other requirements: Conditions of approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: ET Other: gap -r-r-:5/ J v 35ZICIP t, Samples req'd: Yes ❑ No 113 Mud log mq'd: Yes ❑ No Ed" 142S measures Yes No ❑ Directional svy req'd: Yes No ❑ , �y r 44 r h rt K-( k nt-f, J--�5d— � 5-0 U 1' y(_q Spacing exception mq'd: Yes ❑ No Inclination -only svy mq'd: Yes ❑ No .N]J / J Post initial injection MIT mq'd: Yes ❑ No APPROVED BY /' Approved t COMMISSIONER THE COMMISSION t,/;v pate:6/ OFo 10001 Revised 11/2015 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) Submit Forth and Duplicate �sl�/� To: Alaska Oil & Gas Conservation Commission From: Ryan Ciolkosz1Wi CTD Engineer 0, S Date: May 4, 2017 Re: B -36A Permit Approval Permit approval is requested drill an Ivishak horizontal well from the B-36 wellbore Well was initially completed in the Ivishak in June 1996 and new tubing was installed in 2006 with Rig workover However, there is no remaining opportunity in parent bore Proposed plan: Drill a through tubing sidetrack with the CDR 2 Coiled Tubing Drilling rig on or around July 1st, 2016. Coil tubing unit will set a CTD whipstock. CDR 2 will mill a 3.80" window in the 4-1/2" liner and drill an Ivishak well to —13,671 ' MD. The lateral will be completed with a 3-1/2" x 3-1/4'x 2-7/8" 13Cr-80 liner which will be cementedand perforated. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current wellbore and proposed sidetrack is attached for reference. CTD Drill and Complete B -36A program: Rip Start Date: July 1st 2017 Pro -Rig Work scheduled to begin May 15th, 2017 C 1 Mill N. Set Snap Lock Orienter, Set Whipstock V 5 Set TWC. CTD Tree Work Rig Work: 1. MIRU and test BOPE. Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,421 psi. 2. Mill 3.80" window plus 10' of rathole. Swap the well to 8.5-9.5 ppg drilling fluid. 3. PU drilling BHA with GR/Resistivity 4. Drill 4.25" hole to TD. 5. Run 3-1/2"x3-1/4" x 2-7/8" 13CR-80 liner. 6. Pump primary cement bringing TOC to TOL, 29 bbls of 15.3 ppg liner cmt planned* 7. Freeze protect well, RDMO Post Rig: 1. V: Tree work as necessary. 2. F: Liner Lap Test 3. C: RPM and Perforate 4. S: Install LTP if necessary.* 5. F: Pressure test Liner top packer ✓ * Approved alternate plug placement per 20 AAC 25.112(1) Mud Program: • Well kill: 8.4-8.6 ppg brine. • Milling/drilling: 8.4-9.5 ppg Power Pro for milling window and drilling Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. . Hole size: 4.25" Liner Program: • 3-1/2", 9.3# 13Cr-85 STL Liner 11,000 MD - 11,500 MD • 3-1/4", 6.5# 13Cr-85 TCII Liner 11,500 MD — 11,900 MD • 2-7/8" 6.4# 13Cr-85 STL 11,900' MD- 13,671 MD • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. • Magnetic and inclination surveys will be taken every 30 ft. • Distance to nearest property — 27,158 • Distance to nearest well within pool - 70'(B -27C) Logging 0 MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. Perforating: • 2" guns, 6 spf, pert guns • The primary barrier for this operation: a minimum EMW of 8.4 ppg. - • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti -Collision Failures / • There are no wells that fail "Major Risk" with the B -36A wellpath. ✓ Hazards % • DS B -pad is an H2S pad • Low Risk of lost circulation • No anticipated fault crossing Reservoir Pressure • The reservoir pressure on B -36A is expected to be 3318 psi at 8977' TVDss. (7.11 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,421 psi. Managed Pressure Drilling ✓ • MPD techniques may be used to improve hole stability. • An automatic choke will maintain a target ECD at the window for the duration of drilling to improve hole stability. • A pressure schedule will be used for tripping In/Out of the hole. The purpose of the pressure schedule for tripping is to maintain the same bottom hole pressure at the window by applying surface pressure via the choke. • At all times, drilling fluid weight will be greater than equivalent pore pressure. MPD is only being used for hole stability. Ryan Ciolkosz CC: Well File CTD Engineer Joseph Lastufka TREE= CNV WE.LFEAD= FMC ACTLATOR= BAKERC OKB. 6-21= 76.91' BF. flEV = 44.4' KOP= 1250' Max Angle = 86" @ 11935' Datum MO= 11389' DatumTVD= 88WSS 20- CONDUCTOR 91.5#, H-40, D =19.124" 7" CSG, 26#, L-80 BTC, D = 6.276- 9-5/8" CSG 40#, L-80 BTC, D = 8.635" Minimum ID = 3.725F'@ 10608' 4-1/2" HES XN NIPPLE & JFE BEAR .0152 bpf, D = 3.958" 4-12" TBG STUB (09/09 PERFORATION SUMMARY REE LOG: BFDS ON 05/18/96 ANGLE AT TOP PERF: 82" Q 12180' Note: Refer to Pfoduction DB for historical pert data SIZE SPF INTERVAL Opn/Sgz SHOT SOZ 3-3V 6 11590-11610 S 0724196 06107/14 3-318" 6 11670- 11680 S 0724/96 06/07/14 2-718" 6 11750- 11780 S 02/16/00 06/07!14 2-718' 6 1218)-12210 O 02/02!16 BK 33V 6 12490 - 12520 C 06/02/96 B-36 [SA'NOTES: WELL ANGLE> 70 @ 11495'*** CHROME TBG, CSG & LINER"` 2DW —14-1/2- HES X NP, D = 3.8 3193' 7" HES ES a NTH2 3205' 9-5/8"X7" BKR EC PKR GAS LIFT MANDRR-S ST MVTVD 10614' 10' TNVTE-BACK SLV, D= 5241" TYPE VLV LATCH PORE DATE 4 38KGB2 0620114 PJC LNR TOFYPERF CORRECTION DOME BK 16 06/13114 3 69KG82 SO 8K 20 06113/14 2 89KGB2 DMY BK 0 09110108 102KGB2 DMP' BK 0 09110/08 10374' H7" X 4-12" BKR S3 PKR D = 3.870" 10557 -14-12- HBS X 1I, D = 3.813" 10564' H 7- X 4-12" BKR S-3 PIOZ D = 3.875- 1060F —j4-112" HES XN NP, D= 3.725" 10614' 10' TNVTE-BACK SLV, D= 5241" 10620' 4-1/2" wLEG, D = 3.958' 7" X 4-12" TNV DOVE TA HYDRO HGR, D = 3.915" 124W 1-14-12" WFD COP (02102/16) / 12590' CTM18F,1 H - MLL® WFD COP / FASORLL (06/11/14) DATE REV BY COMMENTS DATE REV BY OOMABNTS 0522196 N28E ORIGINAL COMPLETION 02115/16 JTC/JIuD SET CBP/ADPERFS (02/02/16) 09104106 D16 RWO 09111/08 D16 RWO 06/17/14 JCF/JMD CMT SOZ/MLL CBP(617-11!14) 06/17/14 WECJJbD GLV C!O (06/13/14) 0620114 PJC LNR TOFYPERF CORRECTION PRUDHOE BAY UNIT WELL' B36 PE RM! No: 1960650 AR No: 50-029-72667-00 SEC 31, T11 K R14E, 529' FPL & 1894' BP Exploration (Alaska) TREE= aw VYBLHEAD= FMC ACTUATOR= BAKERC OKB. TLE/ = 76.91' BF. TLEV = 44.4' KOP= 1250 Max Angie 86' Daban ku Datum B-s6A Proposed = 11935' = 11389' N 91.5#, H-40, D =19.124' 1TVDIDEVITYPE1 D= 8800SS 10620' T CSG, 26#, L-80 BTC, D = 6.276" ILATEHIPaRri DATE 4 9-5/8" CSG, 40111, L-80 BTC, D = 8.835' 3641 43 KG62 7" CSG, 26#, L -BO BTGM, D = 6276" 873: 16 06!13/14 3 Minimum ID = 3.7256'@ 10608' 4-1/2" HES XN NIPPLE 5706 42 KGB2 4-12' TBG, 12.6#, 13CR80 VAM TOP & JFE BEAR .0152 bOf. D= 3.958' 1051' PERFORATION SUMMARY REF LOG: BHCS ON 05/18/96 ANGLE AT TOP PERF: 82' @ 12180' Note: Refer to Pmdwfm DB for historical perf data S12E SPF INTERVAL OpNsciz SHOT SOZ 3-3/8" 6 11590-11610 S 07/24/86 06/07/14 33/8' 6 11670-11680 S 07/24/96 06/07/14 2-7/8' 6 11750-11780 S 02116/00106/07/14 2-7/8' 6 12180 -12210 O 02/0216 33/8' 6 12490-12520 C 06`02!96 STOP OF 4-12' LNR 4-12' TBG, 12.6#, L-80, .0152 bpf, D = 3.958' T CSG, 29#, 13CR W= D= 6.184' 11 4-1/2'LW 3.70 Baker Deployment Sleeve - 11,000' 3-1/2"X Nipple -11,010' 4-1/2" Whipstock -11,55( 4-1/2" CIBP - 11,580' MD - 12400' 4-12' YWD(BP(02/02/16) 12590'CTM FISH -MLLEE)WFDCBP 8 FASDRLL (06/11/14) D = 3.953' SAI / NOTES: W ELL ANGLE > 70 @ 11495' "' CHROME TBG, CSG & LINIEFr-- 2085'-14-12' HES X NP, D = 3.8 3183' 7" FES ES CEME NTER 3205' 9-5/8" X 7' BKR EC PKR GAR I Fr MANIYIR C ST MD 1TVDIDEVITYPE1 10'TWTEBACKSLV,D=5.241' 10620' VLV ILATEHIPaRri DATE 4 3804 3452 43 KG62 DOME BK 16 06!13/14 3 6909 5706 42 KGB2 SO BK 20 06/13114 2 8942 7209 42 KGB2 DMY BK 0 09110/08 1 10266 8196 41 KGB2 I)MY BK 0 09/10/08 10344'--�4-12' FE•.S X I4°, D= 3.613' 10374' 7" X 4-12' BKR S3 PM D = 3-870' 1� 4-12-HESX NP, D=3-813' X 4-12' UNDUE O 12" FES X NP, D= 10664' H T X 4-12" BKR S-3 PKR D = 3.875' 105eT 4-12'I$XNP,D=3.613' 10608' I—j4-1/2' FES XN NP, D= 3.725' 10614' 10'TWTEBACKSLV,D=5.241' 10620' W2G. D5 j 10624' H 7' X 4 12" 7NV LTP, D = 3.861' 106'26' 7"X4-12'TIWDOVETAL FIYDRO HGR D= 3.915" 3-1/2" 9.3# 13CR-80 STL -11,500' MD ,_---3-1/4" 6 4# 13CR-80 TCII -11,900' MD RA Tag RA Tag 2-7/8" 6.4# 13Cr-80 STL -13,671 DATE REV BY COMMENTS DATE RE/ BY COMMBJTS 0522196 N28E ORIGINALCOMPLETR)N 02/15/16 JTO7JIJD SEE OBP/ADPBIFS(02/02/16) 09-1 DI6 RWO - 08/11/08 016 RW 06/17/14 J55JM1) CMTS(OZ/MLLCBP(617-11/14) 06/17/14 WECJJM) GLV 00 (06113/14) -05—C 06/20!14 LN2 TORPERF CORRECTION FRUOFIOE BAY LW VVaL B-36 T$&4T No: 1960650 AR No: 50-029-22667-00 SEC 31, T71 K R14E 529' FTL 81894' FEL BP Exploration (Alas ka) :� �= IM bpti0+0� North America - ALASKA - BP Prudhoe Bay PB B Pad B-36 B -36A Plan: B -36A WP07 BP Coil Tubing Report 03 May, 2017 riFag BAKER HUGHES BP B -36A IT ., 1044111t b p r BAK Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB B Pad Well: B-36 Wellbore: B -36A Design: B -36A WP07 BP B -36A R•• BP Coil Tubing Report Easting: BAK Design B -36A WP07 — u..G�c n Local Co-ordinate Reference: Well 8-36 Phase: TVD Reference: Mean Sea Level Latitude: MD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) North Reference: True 148° 40'31816 W Survey Calculation Method: Minimum Curvature Ground Level: Database: EDM R5K-Alaska PROD -ANCP1 Dip Angle Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Use AK 14267'158641 Using Well Reference Point Map Zone: NAD27'OGP-Usa AK/ Alaska zone 4126734'1586, Using geodetic scale factor Site PB B Pad, TR -11-14 Site Position: From: Map Position Uncertainty: 0.00 usft Well B-36, B-36 Well Position +N/ -S 0.00 usft +E/ -W 0.00 usft Position Uncertainty 0.00 usft Wellbore B -36A Magnetics Model Name Sample Date Easting: BGGM2016 7/1/2017 Design B -36A WP07 — Audit Notes: 0.000 Version: Phase: Vertical Section: Depth From (TVD) Latitude: (usft) Easting: -43 23 Northing: 5,946,440.220 usft Latitude: 70' 15' 36.475 N Easting: 662,094.050 usft Longitude: 148' 41' 22.843 W Slot Radius: 0.000 in Grid Convergence: 1.23 ' Northing: 5,950,114.741 usft Latitude: 70' 16' 12.259 N Easting: 663,733.740 usft Longitude: 148° 40'31816 W Wellhead Elevation: 43.23 usft Ground Level: 42.30 usft Declination Dip Angle Field Strength 1°I 1°I InT) 17.81 80.99 57,547 1 PLAN +N/ -S (usft) 000 Tie On Depth: +E/ -W (usft) 0.00 11,463 17 Direction 1�1 7467 59/2017 3: 04: 23PM Page 2 COMPASS 5000.1 Build 81B *0'BP by 0.l BP Coil Tubing Report BAKER•■ NUGNES Company: North America - ALASKA - BP Project: Prudhoe Bay Local Co-ordinate Reference: Well B-36 Site: PB Pad TVD Reference: Mean Sea Level Well: 8-386 MD Reference: ORIG KELLY BUSHING a 76.91usft (DOYON 16) Wellbore: B-3 North Reference: True Design: &389A WP07 Survey Calculation Method: Minimum Curvature Database: EDM RSK- Alaska PROD -ANCP1 Survey Tool Program Date 5/3/2017 - - - -- - -- _-- From To (usft) (usft) Survey (Wellbore) Tool Name Description 211.85 11,463.171: MWD - Standard (B-36) MWD MWD - Standard 11,463.17 13,671.93 8-36A WP07(B-36A) MWD MWD -Standard Planned Survey MID Inc (usft) 11 AN TVDSS NIS EIW Northing Easting DLeg V. Sac TFace V) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) (^) 11,463.17 67.20 48.20 8,829.97 1,115.13 6,414.66 5,951,389.069 670,122.180 0.00 6,481.24 0.001 B-36 Actual Survey 11,494.82 70.10 41.80 8,841.50 1,135.97 6,435.48 5,951,390.355 670,142.537 20.94 6,506.83 -65.25 B-36 Actual Survey 11,500.00 70.73 40.81 8,843.24 1,139.64 6,438.70 5,951,394.090 670,145.677 21.77 6,510.90 -56.10 11,524.60 73.80 36.20 8,850.73 1,157.97 6,453.27 5,951,412.734 670,159.849 21.77 6,529.80 -55,77 B-36 Actual Survey TIP 11,550.00 75.40 32.43 8,857.48 1,178.19 6,467.07 5,951,433.251 670,173.204 15.63 6,548.46 -66.75 KOP 11,570.00 73.84 31.49 8,862.79 1,194.55 6,477.28 5,951,449.828 670,183.053 9.00 6,562.63 -150.00 End 9deg/100ft 11,600.00 68.16 27.94 8,872.55 1,219.17 6,491.35 5,951,474.739 670,196.580 22.00 6,582.70 -150.00 11,610.00 66.28 26.70 8,876.42 1,227.36 6,495.58 5,951,483.019 670,200.632 22.00 6,588.95 -148.84 6 11,671.68 53.14 22.78 8,907.48 1,275.56 6,517.92 5,951,531.691 670,221.922 22.00 6,623.24 -166.52 7 11,700.00 57.22 28.51 8,923.65 1,296.48 6,528.00 5,951,552.830 670,231.543 22.00 6,638.49 50.68 11,800.00 73.22 45.25 8,965.67 1,368.01 6,582.74 5,951,625.523 670,284.707 22.00 6,710.19 47.40 71,898.05 90.00 59.00 8,980.00 1,427.00 6,659.00 5,951,686.156 670,359.661 22.00 6,799.34 40,28 8 11,900.00 90.42 59.07 8,979.99 1,428.00 6,660.67 5,951,667.195 670,361.309 22.01 6,801.21 10.00 11,948.98 101.03 60.97 8,975.11 1,452.33 6,702.82 5,951,712.427 670,402.918 22.00 6,848.29 10.00 9 532017 3:04:23PM Page 3 COMPASS 5000.1 Build 81B el"s bp BP %� BP Coil Tubing Report BAK R•• HUMES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 13-36 Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) Well: B-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A WP07 Database: EDM RSK- Alaska PROD -ANCP1 Planned Survey MD Inc AN TVDSS IIS E/W Northing Easting DLeg V. Sec TFace (usft) (°I (°) (usft) (usft) (usft) (usft) (usft) (°1100use) (usft) 1°I 12,000.00 90.47 64.79 8,970.01 1,475.42 6,747.94 5,951,736.491 670,447.517 22.00 6,897.91 160.00 12,002.26 90.00 64.95 8,970.00 1,476.38 6,749.98 5,951,737.495 670,449.541 21.99 6,900.13 160.38 End 22deg/100R 12,100.00 90.00 76.68 8,970.00 1,508.43 6,842.14 5,951,771.547 670,540.969 12.00 6,997.48 90.00 12,162.26 90.00 84.15 8,970.00 1,518.79 6,903.48 5,951,783.234 670,602A72 12.00 7,059.39 90.00 11 12,200.00 90.00 79.63 8,970.00 1,524.11 6,940.84 5,951,789.368 670,639.299 12.00 7,096.82 -90.00 12,300.00 90.00 67.63 8,970.00 1,552.25 7,036.61 5,951,819.582 670,734.426 12.00 7,196.62 -90.00 12,400.00 90.00 55.63 8,970.00 1,599.69 7,124.43 5,951,866.915 670,821.192 12.00 7,293.86 -90.00 12,500.00 90.00 43.63 8,970.00 1,664.35 7,200.47 5,951,935.209 670,895.806 12.00 7,384.29 -90.00 12,600.00 90.00 31.63 8,970.00 1,743.41 7,261.41 5,952,015.568 670,955.005 12.00 7,463.96 -90.00 12,697.26 90.00 19.95 8,970.00 1,830.83 7,303.65 5,952,103.881 670,995.332 12.00 7,527.81 -90.00 12 12,700.00 90.00 20.28 8,970.00 1,833.40 7,304.60 5,952,106474 670,996.219 12.00 7,529.40 90.00 12,800.00 90.00 32.28 8,970.00 1,922.90 7,348.80 5,952,196.906 671,038.458 12.00 7,595.69 90.00 12,900.00 90.00 44.28 8,970.00 2,001.25 7,410.64 5,952,276.580 671,098.577 12.00 7,676.05 90.00 13,000.00 90.00 56.28 8,970.00 2,065.03 7,487.42 5,952,342.013 671,173.946 12.00 7,766.96 _ 90.00 13,047.26 90.00 61.95 8,970.00 2,089.28 7,527.96 5,952,367.134 671,213.950 12.00 7,812.47 90.00 13 13,100.00 86.23 63.06 8,967.13 2,113.58 7,574.65 5,952,392.443 671,260.097 12.00 7,863.92 10.00 13,200.00 108.04 65.25 8,946.14 2,156.16 7,662.46 5,952,436.923 671,346.948 12.00 7,959.86 10.06 13,216.81 110.00 65.63 8,940.73 2,162.89 7,676.74 5,952,443.758 671,361.083 12.00 7,975.36 10.52 14 13,300.00 110.00 76.28 8,912.20 2,188.22 7,750.70 5,952,470.888 671,434.472 12.00 8,053.44 88.17 13,400.00 110.00 69.05 8,878.00 2,200.19 7,843.71 5,952,484.875 671,527.191 12.00 8,146.31 87.81 13,461.61 110.00 96.92 8,856.93 2,197.17 7,901.48 5,952,483.119 671,585.010 12.00 8,201.23 88.65 15 13,500.00 110.00 92.02 8,843.80 2,194.36 7,937.44 5,952,481.092 671,621.014 12.00 8,235.16 -89.16 5/3@017 3:04 23P Page COMPASS 5000.1 Build BIB �� � ,: by BP rias %00414: BP Coil Tubing Report BAKER HUMES Company: North America -ALASKA -BP Local Co-ordinate Reference: Well B-36 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) Well: B-36 North Reference: True Wellbore: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A WP07 Database: EDM RSK- Alaska PROD -ANCP1 Planned Survey MD Inc Azi TVDSS NIS EIW Northing Easting DLeg V. Sec TFace (usft) (1) (1) (usft) (usft) (usft) )usft) (usft) (°1100usft) (usft) 1°1 13,600.00 110.00 79.25 8,809.60 2,201.50 8,030.94 5,952,490.264 671,714.332 12.00 8,327.22 -87.81 13,671.93 110.00 70.06 8,785.00 2,219,37 8,096.05 5,952,509.541 671,779.034 12.00 8,394.74 -88.43 TD at 13671.93 5/3/2017 3: 04: 23PM Page 5 COMPASS 50001 Build 818 % b BP //.&6 10 p 8P Coil Tubing Report B"IR HUGOM Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB B Pad Well: B-36 Wellbore: B -36A Design: B -36A WP07 Targets Target Name -hitrmiss target Dip Angle Shape (•) Dip Dir. TVD 19 (usft) +N/ -S +PJ -W (usft) (usft) B -36A T3 0.00 0.00 8,970.00 2,089.14 - plan misses target center by O.t4usft at 13047.23usft MD (8970.00 TVD, 2089.27 N, 7527.94 E) - Point B -36A T2 0.00 0.00 8,970.00 1,664.13 - plan misses target center by 0.29usft at 12500.00usft MD (8970.00 TVD, 1664.35 N, 7200.47 E) - Point B -36A Fault 3 0.00 0.00 0.00 3,925.38 - plan misses target center by 8979.19usft at 13671.93usft MD (8785.00 TVD, 2219.37 N, 8096.05 E) - Polygon Point 1 0.00 0.00 Point 0.00 -2,194.72 Point 0.00 -3,985.91 Point 0.00 -2,194.72 B -36A T4 0.00 0.00 8,785.00 2,218.83 - plan misses target center by 0.50usft at 13671.75usft MD (8785.01 TVD, 2219.31 N, 8095.88 E) - Point B -36A Polygon 0.00 0.00 0.00 1,502.26 - plan misses target center by 8844.18usft at 11463.17usft MD (8829.97 TVD, 1115.13 N, 6414.66 E) - Polygon Point 1 0.00 0.00 Point 0.00 357.50 Point 0.00 741.97 Point 4 0.00 853.42 Point 5 0.00 627.91 Point 0.00 432.95 Point 0.00 68.91 Point 8 0.00 -211.49 B -36A Fault 4 0.00 0.00 0.00 852.88 - plan misses target center by 8853.75usft at 11463.17usft MD (8829.97 TVD, 1115.13 N, 6414.66 E) Polygon P 7,528.01 7,200.86 8,830.35 0.00 -43.75 215.36 -43.75 8,098.00 6,733.00 0.00 441.91 701.35 1,418.00 1,484.11 1,019.73 602.68 111.43 5,821.60 Local Co-ordinate Reference: Well 8-36 TVD Reference: Mean Sea Level MD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Northing Easting (usft) (usft) Latitude Longitude' 5,952,367.000 671,214.000 70° 16'32.769 N 148° 36' 53.611 W 5,951,935.000 670,896.000 70° 16'28.592 N 148° 3T 3.154 W 5,954,231.000 672,476.000 70° 16'50.814 N 148" 36'15.625 W 5,954,231.00 672,476.00 5,952,036.00 672,480.00 5,950,251.00 672,778.00 5,952,036.00 672,480.00 5,952,509.000 671,779.000 70° 16'34.038 N 148° 36'37.067 W 5,951,763.000 670,432.000 70° 16'27.0134 N 148° 37' 16.775 W 5,951,763.00 670,432.00 5,952,130.00 670,866.00 5,952,520.00 671,117.00 5,952,647.00 671,831.00 5,952,423.00 671,902.00 5,952,218.00 671,442.00 5,951,845.00 671,033.00 5,951,554.00 670,548.00 5,951,094.000 669,535.000 70° 16'20,625 N 148° 37'43.327 W i ont 1 0.00 0.00 0.00 5,951,094.00 869,535.00 Point 0.00 -137.97 2,984.91 5,951,021.00 672,522.00 B -36A Tl _ 0.00 0.00 8,980.00 1,426.84 6,659.34 _ _ 5,951,686.000 _ 670,360.000 70' 16'26.263 N 148° 37'18,922 W 5 O17 3.04:23PM Page 6 COMPASS 5000.1 Build 81B i ont 1 0.00 0.00 0.00 5,951,094.00 869,535.00 Point 0.00 -137.97 2,984.91 5,951,021.00 672,522.00 B -36A Tl _ 0.00 0.00 8,980.00 1,426.84 6,659.34 _ _ 5,951,686.000 _ 670,360.000 70' 16'26.263 N 148° 37'18,922 W 5 O17 3.04:23PM Page 6 COMPASS 5000.1 Build 81B b BP RARE"00"'r p BP Coil Tubing Report BMER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well B-36 Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB B Pad MD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) Well: B-36 North Reference: True Wellborn: B -36A Survey Calculation Method: Minimum Curvature Design: B -36A WP07 Database: EDM RSK- Alaska PROD -ANCPl - plan misses target center by 0.31 usft at 11898.28usft MD (8980.00 ND, 1427.11 IN, 6659.18 E) - Point B -36A Fault 2 0.00 0.00 0.00 2,284.50 8,755.63 5,952,589.000 672,437.000 70° 16'34.677 N 148° 36'l 7.857 W - plan misses target center by 8809.97usft at 13671.93usft MD (8785.00 TVD, 2219.37 N. 8096.05 E) - Polygon Point 0.00 0.00 0.00 5,952,589.00 672,437.00 Point 0.00 -878.81 -848.38 5,951,692.00 671,608.00 B -36A Fault 5 0.00 0.00 0.00 3,144.95 7,183.87 5,953,415.000 670,847.000 70" 16'43 156 N 148'37'3,602 W - plan misses target center by 8880.60usft at 13671.93usft MD (8785.00 TVD, 2219.37 N, 8096.05 E) - Polygon Point 1 0.00 0.00 0.00 5,953,415.00 670,847.00 Point 2 0.00 -933.29 -1,378.72 5,952,452.00 669,489.00 B -36A Fault 1 0.00 0.00 0.00 2,845.21 7,581.47 5,953,124.000 671,251.000 70° 16'40.204 N 148° 36'52.032 W - plan misses target center by 8822.28usft at 13671.93usft MD (8785.00 TVD, 2219.37 N. 8096.05 E) - Polygon Point 1 0.00 0.00 0.00 5,953,124.00 671,251.00 Point 0.00 -13.48 1,263.09 5,953,138.00 672,514.00 Casing Points -- -- - -- --- Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 11,550.00 8,857.48 41/2"Planned TOWS 4.500 4.500 13,671.93 6,784.97 27/8" 2.785 4.250 &32017 3r04:23PM Page 7 COMPASS 5000.1 Build 81B ♦00 BP ;,,,,� bp BP Coil Tubing Report BAHUGHES KER Company: North America - ALASKA - BP TVD Reference: Mean Sea Level MD Reference: Project: Prudhoe Bay True Survey Calculation Method: Minimum Curvature Database: Site: PB B Pad Well: B-36 Wellbore: B -36A Design: B -36A WP07 Plan Annotations - Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 11,463.17 8,829.97 1,115.13 6,414.66 B-36 Actual Survey 11,494.82 8,841.50 1,135.97 6,435.48 B-36 Actual Survey 11,524.60 8,850.73 1,157.97 6,453.27 B-36 Actual Survey TIP 11,550.00 8,857.48 1,178.19 6,467.07 KOP 11,570.00 8,862.79 1,194.55 6,477.28 End 9deg/100ft 11,610.00 8,876.42 1,227.36 6,495.58 6 11,671.68 8,907.48 1,275.56 6,517.92 7 11,898.05 8,980.00 1,427.00 6,659.00 8 11,948.98 8,975.11 1,452.33 6,702.82 9 12,002.26 8,970.00 1,476.38 6,749.98 End 22deg/100ft 12,162.26 8,970.00 1,518.79 6,903.48 11 12,697.26 8,970.00 1,830.83 7,303.65 12 13,047.26 8,970.00 2,089.28 7,527.96 13 13,216.61 8,940.73 2,162.69 7,676.74 14 13,461.61 8,856.93 2,197.17 7,901.48 15 13,671.93 8,78500 2,219.37 8,096.05 TD at 13671.93 Checked By: Approved By: Local Co-ordinate Reference: Well B-36 TVD Reference: Mean Sea Level MD Reference: ORIG KELLY BUSHING @ 76.91 usft (DOYON 15) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Date: SWO17 3:04:23PM Page B COMPASS 5000.1 Build BIB �{"'\ N ProlecL PrutlM1ce Bay Site: B-36PH 8 Well: L4]6 u.PnoNw neaffAILS: 61y@CFW36A aM 5386 B.36A - - IEFea+celN,71,au coae'inelelrul wlnmz wm B3eirvgµaB aW15 Rett Neen 3w -ppp/'. _=_i M Wellbore: &36A Phn:B-36AWP(l7(B-XB-WA) WbAVw. 8].93 os..mrm B-316 semen Ns6RHerena. swan O.wN,oaon N,09 B�WO�R aaee GWGIQilYW6HNG®7691WAIOOYW 161 Nuem __ 66�a: __ 11463.1] Celole4m Nd6M. Nirtm3n Wvawrt WELL DETAILS: B36 B-36,076 E S80()B-36A Bi6Acvn15ory f1B SECTIONDETAIS Sec MD he Aa NTVD .NFS .ELW DleO TFm VSec1 Targe 1 11463.17 67.20 48.20 8929.97 1115.13 6414.66 0.00 0.00 6481.24 2 11494.82 70.10 41.80 8941.50 1135.97 6435.18 20.94 -65.25 6506.83 3 11524.60 73.80 3630 8850.73 1157.97 645127 21.77 -66.10 6529.80 4 11550.00 7810 32.43 8057.48 1178.19 6467.07 15.63 -66.75 6548.46 5 11570.00 73.84 31.49 8862]9 1194.55 647728 9.00 -150.00 656263 6 11610.00 66.28 26.70 887642 1227.36 6495.56 22.00 -150.00 6588.95 7 11671.68 5114 21.78 8907.48 127556 6517.92 22.00 -166.52 662124 8 1189805 90.00 59.00 8980.00 1427,00 6659.00 22.00 50.68 6798.34 9 1194898 101.03 60.97 8975.11 1452.33 6702,82 12.00 10.00 6848.29 10 12002.26 90.00 64.95 9970.00 1476.37 674898 22.00 160.00 6900.13 11 12162.26 90.00 84.15 8970.00 1518.79 690148 12.00 90.00 7059.39 12 12697.26 90.00 19.95 8970.00 1830.83 7303.65 1200 -90.00 7527.81 13 13047.26 90.00 61.95 8970.00 208828 7527.96 12.00 90.00 7812.47 14 13216.61 110.00 65.63 8940.73 2162.69 7676.74 12.00 10.00 7975.36 15 13461.61 110.00 96.92 8856.93 2197.17 7901.48 12.00 90.00 8201.23 16 13671.93 110.00 70.06 878800 1219.37 8096.05 12.00 -90.00 83974 Sad ANNOTATIONS TVD MD Anndaboa 8829.97 1146117 B-36AdualSumy 891.50 11494.82 B,MAdud Sumy 8850.73 11524.60 MAdual SUMYTIP 8857.48 11550.00 KOP 886279 11570.00 Erldg*110D0 8876,42 11610.00 6 8907.48 11671.68 7 8960.OD 1189605 8 8975.11 11948.99 9 1970.00 12002.26 End 22dey10pl 8970.00 12162.26 11 897D.00 12697.26 12 8970.00 13047.26 13 8910.73 13216.61 14 885893 13461.61 15 8785.00 13671.93 TD at 13671.93 2600� 2500 B -36A WP07 1 2600 1200'. tial* 67W 68011 6900 7060 7100 72W 7300 7600 7500 7600 771* 78W 7900 8000 8100 SIM 83W 8aU1 West( -)/East(+) (100 usft/in) 8700- 8750 B-36,076 E S80()B-36A Bi6Acvn15ory f1B WP07 KOP B-J6'&36A 8850 Ed9dep/IWO. TD.1367193 .�, 8900 6' - 15 L 7 B 36AT1 B 36A I2 B-36AT3 6 8950 d t] IJ 901*. 3 y Fsd22dep/IL*8 II li 13 W u B W13 16 V 91150 9100 - 2 (- 9150 - MedNy aLeWt - - - 6500 655() 6600 6650 67W 6750 6860 6850 69W 6950 7600 7050 7100 7150 7200 7250 7300 73511 7600 7450 7500 7550 7600 7650 771* 7750 7800 7850 7900 7950 SOW 8050 81W 81511 82W MU 8300 8350 8000 06511 Vertical Section at 74.67'(50 usft/in) Proieel: Pwhoe Bey Bile: PB B Pad Well: B -M Wellbore: &36A Plen:B36AWPB7(8-36113 6A) NYnM¢ TinNpt MytlkNNM1.t18 a�. m me.mm uom ecm® WELLBORE DETAILS: B36A rart#wfwaawnan B -36A � eA (Nfl6tlncas wd M Tau .. vetitl(IVDlgebarce. Nen se tatl Parent Wellbore: B36 emelve)6e�e. Sul. lnnon, 0 aael Te an MD: 1fA63.t7 N I)Vl6aeeake. MIC KELLY euswxc V� 7691 IMYr 16) ulmNan trema Nnrcahawre ri.E BAKER HUGHES 1281 IIW I0 d WIO IIW ]W O NA Mean Sea Level 58W 5Y0) 600) 610) 610) 630) 6A0) 65W 6EW '.. _ .. _ -... bNp 68W fi900 ](100 ]IW ]2W ]300 ]4W ]SW )6W >]W ]tl011 ]Y(IU tl01N1 tlIW tl2(B 830) tl400 BSfB tl6W X]W tltlW 85Y10 YL1M1 YIW 92011 YVW Y900 45W West( -)Bast(+) (100 usftlin) t 0 AV 00)N by Project: Prudhoe Bay Site: PB B Pad Well: B-36 Wellbore: B -36A Plan: B -36A W P07 (B36/B-36A) ANTI -COLLISION SETTINGS COMPANY DETAILS: North America - ALASKA - BP Interpolation Method: MD, Interval: 25.00 caomation Method: Minimum Curvature Depth Range From: 11463.17 To 13671.93 Error System: ISCWSA Results Limited By: Centre Distance: 1563.82 Scan Method: Trav, Cylinder North Reference: Plan: B -36A WP07 (B -36/B -36A) Error Surface: Elliptical Conic BAKER HUGHES LEGEND &07, 0 07. &07 V1 £ &07, &WA B WA VO F B D. &27C. 0,27C VO B34&WBWVI 07-03, W -W, 07Y03A V1 0709, W WA, 07-09A W - W 13, 0713C, 071= VO - OR 13, 0743CPB1, 0713CPBt VO s 0737, 07-W, 0737 W b p Possible Magnetic Interference: From KOP to 11,720' MD Project: Prudhoe Bay I ANTI -COLLISION SETTINGS Site: PB B Pad COMPANY DETAILS: Norah Ani - ALASKA - BP Well: B-36 Interpolation Method: MD, interval: 25.00 Depth Range From: 11463.17 To 13671.93 Wellbore: B -36A Results Limited By: Centre Distance: 1563.82 Plan: B -36A WP07(B-36/13-36A). Reference: Plan: B36A WP07 (B36/8 -36A) Depth Range: 11463.17 To 13671.93 11From colour TOVID 463 11717 20 _._ 0 11720 12100 12100 13500 13500-__ -----13672 CplNactlr4o: Jose Vazquez -Tech 6uppe1l -. eo7 6€fpi✓Ji a D 40 714478-4339 Cel Phone 6,307, e07n, ae7nv0 907-341-7604 Emergency ,. en, a M. 13, Dv0 YorehaRaglursingh-surveyManager a3113,36 v1 907-342-2436 Cal Prime . 070107074, 07 o(=v Tai Slurdivant-DD Coordinator 2 0709, 97,364.07498 W 907dO5fi294 Cdl Phone D 01110' 130.47`1Xv Pal>;ck Rider -JAWD Coordinew 100 07.1107 I=Pm. 0713 907-952-3497 CalPhan 180 W 37.0737, 07-37 W Cad Ulrich - Operations ManagaAzimuth from North [ q vs Centre to Centre Separation 907-382-5534 Cel Phme [10 usft/in] Error System: ISCWSA Scan Method: Tray. Cylinder North Ener Surface: Elgotical Conic I/.&2 BAKER HUGHES ovum IwN: 4290 ON`a .eta N,.Mn6 FeNlnp IaIIroMe bnplWdg 4M o.aa ON S%011a.]41 'g•,9122594 146.40'3381fiW Sm - MD Inc - Aei TVD -.W-S .E/ -W Dleg TFace Yaw 1 11463.17 67.20 48.20 8829.97 1115.13 6414.66 0.00 0.00 6481.24 2 11494.82 70.10 41.80 8841.50 1135.97 6435.6 20.94 -65.25 6506.83 3 11524.60 7300 36.20 8850]3 1157.97 6453.27 21.77 -56.10 652980 4 11550.00 75.40 32.43 885/.48 1178.19 6467.07 15.63 -66.75 6546,46 5 11570.00 73.84 31.49 8862.79 1194.55 6477.28 9.97 -150.W 6562.63 6 11610.00 66.28 26,0 8876.42 1227.36 6495.58 22.00 4W.W 6560.95 7 11671.68 53.14 22.78 8907.48 1275,56 6517.92 22.97 466.52 6623.24 8 11898.05 90.00 59.00 8980.00 1427.00 6659.00 22.00 50.68 6798.34 9 11948.98 101.03 60.97 8975.11 1452.33 6702.82 22.00 10.W 684829 10 12002.26 9000 64.95 0970.00 1476.37 6749.98 22.00 180.00 6900.13 11 12162.26 90.00 84,15 8970.00 1518.79 6903.48 12.W 90.00 7059.39 12 12697.26 good 19.95 8970,00 1830.03 7303.65 12.00 -90.W 7527.81 13 13047.28 90.00 61.95 8970.00 2089.20 7527.96 12.00 90.00 7812.47 14 13216.61 110.00 65.0 8940,3 2162.69 7676.74 12.00 10.00 7975.36 15 13461.61 110.00 96.92 8856.93 2197.17 7901.48 12.00 90.00 8201.23 6UBVEYProGenra 6ffi:2J1]00]rW1Y1C0 VBWNd: I'N Vd9[n: DqN Fmn IXgl, Te ar"M. T. 211.0 11463.17 I:M"-63xmw1e,361 MWD 11463.17 1367193 eEi WF071e3901 MWD 180 Azimuth from North[ I vs Centre to Centre Separation [40 usturin] .0100. S00 North America - ALASKA - BP Prudhoe Bay PB B Pad B-36 B -36A B -36A WP07 Travelling Cylinder Report 03 May,2017 BAKER HUGHES BP /F&\ by Travelling Cylinder Report BAKER �'r*�r MGM Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB B Pad Site Error: 0.00 usft Reference Well: B-36 Well Error: 0.00 usft Reference Wellbore B -36A Reference Design: B -36A Ili Local Co-ordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well B-36 Mean Sea Level ORIG KELLY BUSHING @ 76.91usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM RSK- Alaska PROD -ANCP1 Offset Datum teference B -36A WP07 �ilter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference From lterpolation Method: MD Interval 25.00usft Error Model: ISCWSA lepth Range: 11,463.17 to 13,671.93usft Scan Method: Tray. Cylinder North lesults Limited by: Maximum center -center distance of 1,563.82 usft Error Surface: Elliptical Conic Survey Tool Program Data 5/3/2017 ' From To Reference Offset (usft) (usft) Survey (Wellbore) Tool Name Description 211.85 11,463.17 1 : MWD - Standard (B-36) MWD MWD -Standard Deviation 11,463.17 13,671.93 B -36A WP07(B-36A) MWD MWD -Standard Distance Casing Points from Plan Offset Well -Wellbore-Design lush) Measured Vertical (usR) Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 110.00 33.09 20" 20.000 26.000 B-04 - B -04A - B -04A 3,649.00 3,262.70 95/6" 9.625 12.250 10,823.00 8,531.75 7" B-04 - B-04APB1 - B-04APB1 2000 8.500 11,550.00 8,857.48 4112" Planned TOWS 4.500 4.500 12,925.00 13,671.93 8,784.97 27/8" 1,396.46 2.785 4.250 Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well -Wellbore-Design lush) (usft) (usR) (usft) PB B Pad B-04 - 8-04 - 8-04 Out of range B-04 - B -04A - B -04A Out of range B-04 - B-04APB1 - B-04APB1 Out of range B-07 - B-07 - B-07 12,925.00 12,150.00 1,396.46 482.59 941.61 Pass - Major Risk B-07 - B -07A - B -07A 11,825.00 13,128.00 949.86 616.75 362.48 Pass - Major Risk B-27 - B -27C - B -27C 11,617.88 12,475.00 100.83 32.73 75.63 Pass - Minor 1/200 B-28 - 8-28 - B-28 Out of range B-30 - B -30A - B -30A Out of range 8 -36 -B -36-B-36 11,770.37 11,775.00 70.40 2.09 70.40 Pass-NOERRORS PB DS 07 07 -03 -07 -03A -07-03A 12,289.01 11,508.00 1,406.81 445.42 961.55 Pass - Major Risk 07-03 - 7-038 - 07-038 Plan #4 Out of range 07 -09 -07 -09A -07-09A 13,650.00 10,825.00 500.11 480.57 39.91 Pass - Major Risk 07-13 - 07-13C - 07-13C 12,875.00 14,075.00 899.76 412.69 518.21 Pass - Major Risk 07-13-07-13CPB1-07-13CPBI 12,975.00 13,725.00 987.72 445.20 572.05 Pass - Major Risk 07-37-07-37-07-37 13,425.00 11,725.00 1,070.89 617.60 461.80 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation aWO17 2.07:47PM Page 2 COMPASS 5",1 Build 81B Rolm: Prudhoe Bay Site: PB B Pad Well: 8-36 Wellbore: B Plan: B -36A W Po] PIus500h MD (BS6IB-WA) $ $ 9 m m m $ n e 5953230 B 07/8-07 5953140/ 5953050 5952980 071T07g3CP 5952670 5952760 0713/0]430 S 5952690 5952800 5952510 p5952420- 5 05952330 5952240 z z 5952150 x52080 5951970 5951880 5951790 595800 5951610 347/11 27CP62 5951430 5951340 0 0 0 0 Mean Saa Level ARRU86iru W1 MpMk NaN:lid u>oresorr sssmos m.:ma1 — nbu9mMU WELLBORE DETAILS: B -MA 9Fwarx6P6daanax B -36A coa6noly lwt:l Bnnnm wa16J53MN- Vn6m�R'/019Nnnre: NmnSm L♦W Parent Wellbore: B-36 � NSIReleanm ft, (OMaw) TIe On MD: 11463.1] M°""ar oeph RO—,: p GKLLy683MNG@7691WPMO g16) cuson lmna m�m�mowm.. Easting (90 ushnn) S o 9 9 9 9 — v m E u s a m m 0 0 $ 0 0 8 0 $ a o $ 07-37107-37 B -36A WP07 Plus 500ft MD 36 8 27/8 2]C w_. 0 0 o ge o o e o 0 0 0 0 0 o e Easting(90 u5ivin) 0-36/0-36A WP07 0709/0709 07-09/07-09 PBI �� �r/iuit a Y® 9 9 9 9 \MD - W07 -13A -__.5953230 5953140 30/07308 5953050 5852860 159528]0 x52760 5952890 B3NB36A WPO] 5952800 59x420 z 5952330.- g 052240- "52150 52240-59x150 I59520N 5951970 5951960 5951790 M1700 .x51610 5951520 5951430 5951340 0 o e ,,..0L, Z = b pp N North America - ALASKA - BP Prudhoe Bay PB B Pad B-36 B -36A B -36A WP07 Plus 500ft MD AOGCC Offset Well Report 03 May,2017 F ias BAKER HUGHES BP /Gra2 Anticollision Report BAKM HUGHU Local Co-ordinate Reference: Well B-36 1 by-e0+41,11" Mean Sea Level MD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB B Pad Site Error: 000usft Reference Well: B-36 Well Error: O.00usft Reference Wellbore B -36A Reference Design: B -36A WP07 Plus 500ft MD BP /Gra2 Anticollision Report BAKM HUGHU Local Co-ordinate Reference: Well B-36 TVD Reference: Mean Sea Level MD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) Norm Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP1 Offset TVD Reference: Offset Datum Reference B -36A WP07 Plus 500ft MD Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method; MD Interval 25.00usft Error Model: ISCWSA Depth Range: 11,463.17 to 14,171.93usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic Survey Tool Program Date 5/3/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 211.85 11,463.171: MWD - Standard (B-36) MWD MWD -Standard 11,463.17 14,171.93 B -36A WP07 Plus 500ft MID (B -36A) MWD MWD -Standard Summary Site Name Offset Well - Wellbore - Design PS B Pad B-27 - B -27C - B -27C 8-36 - B-36 - B-36 B-36 - B -36A- B -36A WP07 PB DS 07 Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 11,617.88 12,475.00 100.83 11,770.37 11,775.00 70.40 13,671.93 13,671.93 0.00 532017 4:25:56PM Page 2 of 7 COMPASS 5000.1 Build 81B ZOO,, h BP b lt, y Anticollision Report BAKN 'N HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB B Pad Site Error: 0.00usft Reference Well: B-36 Well Error: 0oousft Reference Wellbore B -36A Reference Design: B -36A WP07 Plus 5001t MD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 8-36 Mean Sea Level ORIG KELLY BUSHING @ 76.91usf((DOYON 16) Tme Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB B Pad - B-27 - B -27C - B -27C Survey Program: 100.GYPCT-CM5, 10166 -MWD, J 5 MM Refuence OftA Measumd VemB l Measum6 Verecal W.tVlelllrorecemle lantle to Depth Depth DWeh mptn 411.8 eEl-W csmn, lusfq (uefq (uel) (uen) (mnl hist) (uafq 11.40157 8,837.58 12,275.00 8.787.37 1,251.09 6,320.96 165.77 11,52117 8,849.77 12,300.09 876829 1,251.14 6,35403 14874 11,54559 6,85038 1232500 8,709.05 1,251.95 6,37892 13373 11,561.17 8.85838 12,35800 8,75945 1,253.38 6,403.87 118,% 11,574.67 8,884.12 12.375.00 8,789.33 1,25561 6,428.77 107.02 11,587.04 884/.99 12497.00 8,788.62 1.2 62 6.453.58 98.97 11,59866 8.872.06 12.425.00 8.78862 1,262.14 647833 95.17 11,609.13 8.87608 12,450.07 8,788.70 1,26525 6.50321 95.78 11.61TU 8,079.70 12,47500 8,789.21 1,267.20 6,52885 10083 11,62500 8852.84 12,50000 6,759.85 1,25792 8,553.03 110.17 1183171 8,955.95 12,52500 8,789.70 1,26728 6,578.02 123.38 11,536.98 8855.50 12,550.00 8,7M67 1,2&537 81502.95 1$931 11.64137 8,890.69 12.575.00 8]09.29 1.262.53 6.6278 157.47 11.61484 8,89247 12.600.00 8]88.53 1,250.59 6,852.45 177.20 11,6:470 8,895.18 12,625.00 8,787,59 1,25349 6,676.91 19799 573/2017 425: 58PM Page 3 of 7 COMPASS 5000.1 Build 81B ►b*BP Q_',by Anticollision Report Company: North America- ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB B Pad MD Reference: Site Error: O.00usft North Reference Reference Well: B-36 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore B -36A Database: Reference Design: B -36A WP07 Plus 5001t MD Offset TVD Reference: Offset Design PB B Pad - B-36 - B-36 - B-36 Survey Program: 212 -MWD Reference onset Measured Vertical Measured vertical OReet Wellbore Ce. care.W Depth Depth Depth Depth aN14 .V -W Cente luso) mate hctm (uefu lueft) lean) fuss) 11475.00 8,83445 11.47500 BBM.45 1,122.60 SAM 66 0.00 11,500.00 8,843.24 11,50000 8.843.24 1.139.64 8.430.70 0.00 11152500 SAW 85 11,525.00 8.850.85 1,158.28 645350 000 111550.M 0,857a 111550.00 885748 1,178.19 6,467.07 0.00 11,574913 8,064.20 11.575.00 8,08334 1,199.09 6.479.48 1.02 11,59953 8.8]23] 11.80000 8,86823 1,220.87 6,491.11 4.% 11.623.15 8,88201 1L625.00 8,812.58 1,24227 6.50282 1055 11.645.42 8892.77 11,650.00 8.876.58 1.MS5 6,51408 19.02 11,656.13 8,904.19 11,67500 888039 1,285.45 6,529.00 2962 11.68943 8,917.81 117W.00 0,883.90 1,307.14 853B81 41.38 11,71543 8,93134 11,72500 8.886.87 1,329.03 6,550.51 52.11 11,742.51 8,944.59 11,750.00 8.889.15 1.351.15 8,55183 6185 11770.37 0,955.91 11.775.00 8,891.10 1,373]6 6.57325 7040 11,798.56 8,965.25 11.80.00 8,892.99 1,39560 8,504.51 7775 11.826.38 8,93230 11.82500 8094.86 1,417.91 6,59563 84.21 11.853.18 8,976.87 11,85o0f) 8,096.85 1,440.30 ea08.56 90.15 11.878.57 8,979.43 11,875.00 8898.94 1,462.86 6,61758 9604 11,903.17 8,979.95 11,900.00 8900.99 1,48500 882060 10252 11,93o,11 8,978.02 11,925W 8902.8] 1,507.37 6,638.58 10947 11,952.93 8.97438 11,95000 8,904.62 1.529.83 SAW." 117.04 11,967.16 8,972.22 11.87500 8,90161 1,552.30 6.661.23 126.40 11,981.31 0,970.79 12.00000 8,908.51 1,57415 6.672.05 13757 11,99533 0,970.08 12.025.00 8,91085 1,597.15 6.882.90 15006 12.009.50 8,9n) W 12,050.00 0,91367 1,818.51 6,69365 16362 12,023.36 8,930.00 12.07500 8,916.01 1812.00 6,704.16 17821 12.036.52 8,970.00 12,10000 8.919.99 1.86446 6,71488 193.63 WEA2 MKMS Well B-36 Mean Sea Level ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP7 Offset Datum 5732017 4:25:58PM Page 4 of 7 COMPASS 5000.1 Build 81B ''� bp Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB B Pad Site Error: O.Oousft Reference Well: B-36 Well Error: O.00usft Reference Wellbore B -36A Reference Design: B -36A WP07 Plus 500ft MD Offset Design PB B Pad - B-36 - B -36A - B -36A WP07 Survey Program: 212-1MD. 11463MND 12,00000 8,970.00 Retarance 8.970.06 OBset 8,97000 12,42500 8.970.00 Me Sumd Vertical Measumd Vertical Dasel WallBon eenite Deyth Depot Depth Depth ew-a eV.w (ush) lusnl lusty luserl Ipm1 lien) 11.475.00 8.83445 11,075.00 8,83145 1,122.60 6.42 66 11,50000 8,84324 11,500.00 8,84324 1139.64 6,430.70 111525M 8,850.85 11,52500 8.850.85 115828 0153.50 11,550.00 8,85]48 11,550.00 8,857,00 1178.19 6,46707 11,57500 Best 22 11,575.00 8,864.22 1,10.65 8,479.76 11,60000 8,072.55 11,80000 8,872.55 1,219.17 6.49185 11,62500 8,882.84 11,825.00 8,88284 1,239.51 0.501.58 11,650.00 0895.18 11,6511.00 0,895.18 1,259.19 6,510.79 11,675.00 8,90940 11,675.00 8,90046 1,278.01 6.518.97 11,70000 8,92365 11]00.00 8923.65 1.296.48 0528.00 11,725.00 8.93648 11,7MeD 8.936.48 1,314.89 6,53901 11,750.00 8,90.83 11,750.00 s%17.83 1.333.06 055188 11,775.W 8,957.59 11,775.00 8,957.59 1,350.82 6.508.50 11,800.00 8,965.67 11.800.00 8,985.67 1,30,01 6.582]4 11.825.00 8,972.01 11,82500 snTel 1,38447 6.60045 11.85000 8,97653 11,85000 8,976.53 1,400.05 6.619.46 11,875.00 097920 11,075.00 8,97820 1,41460 6.639.69 11,900.00 0,97999 11,900.00 8,97999 1428.00 686067 11,92500 8,970.63 11,92500 8,97863 144085 6882.18 11,95000 8,974.92 11950.06 8,974.92 1452.81 6)03.70 11,97500 8,971.34 11.97500 8,971.31 1,464.42 0]25.53 12,000.00 8,970.01 12,000.00 8,97001 1.0542 8.747,94 12,025.00 8 7eW 12.025.00 8,97000 1.48551 6,770.81 12,050.00 8,97000 12,050.00 0,970,00 1,491.39 6,794.17 12.075.00 8,970.00 12.07500 8,970.00 1,502.04 6,817.97 12.100.00 8.970.00 12,100.00 8970.00 1,50543 6,862.14 12.12500 8,90.00 12,12500 8,90.06 1,513.55 086660 12,150.00 8,970.00 12,15000 8.97000 151738 0891.31 12,17500 0,970.00 12175.00 8,970.00 1,520.25 6,916.14 12,200.00 8,970.00 12200.00 8,970.00 1,524.11 6.940.81 12.22500 8,970.06 12.225.00 8,9n1,00 1,529.25 6.965.30 12,250.00 997000 12.250.00 8,97006 1,535.67 6,909.46 12,275.00 0,970.00 12,27500 slincD 1,543.34 7,013.25 12,300.00 8.97000 12,300.00 8,97000 1,552.25 7,026.61 12,325.00 8,97000 12,325.00 8,970.00 1,582.37 7,059.48 12.30.00 8.970.00 12,350.00 0970.00 157367 708176 12.37500 8870.00 12,375.00 3.9M.W 12,00000 8,970.00 12,40000 8.970.06 12025.00 8,97000 12,42500 8.970.00 12050.00 0,970.0 12,450.00 8,970.00 12,0500 0,9700 12.475.0 0,9M.00 12,500.06 8,97000 12.500.00 8,97006 1252500 8,97000 12,525.00 097000 12,550.00 89nee 12,550.00 8,970.00 12,57500 8,970.00 12,575.00 8.970.00 12,000.00 897000 12,600.00 8,97000 12825.00 8970.00 12,625.00 8970.00 12.65006 8.970.00 12,65000 8.970.W 1588.12 7,1044 1.598.69 7,12443 1,614.34 71N69 1,630.03 7,164.15 1.616.71 7,182]6 BP FIN Fla Anticollision Report BAKM Muds Local Co-ordinate Reference: Well B-36 TVD Reference: Mean Sea Level MD Reference: ORIG KELLY BUSHING @ 76.91usft (DOYON 16) North Reference: True Survey Calculation Method Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP1 Offset TVD Reference: Offset Datum C .to czmrc lusel 000 000 0.00 0.00 000 000 000 0.00 0.00 0,00 0.00 000 0,00 0.00 0.00 0.00 0,00 0.00 000 0.00 0.00 0 00 010 0.00 0.00 0.00 000 0.00 000 0.00 0.00 0Do oeo 0.00 0.00 0.00 oW 0.00 0.00 000 000 1.661.3 7,200 47 000 188289 7,217.20 0.00 1,70228 7,233.02 0.00 1,74,47 7,207,75 0.00 1703.41 7.26141 0.00 1,765.03 727396 000 1,78727 7,285.39 0.00 57372017 4:25:58PM Page 5 of 7 COMPASS 5000.1 Build 81B 2' BP b p Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB B Pad MD Reference: Site Error: O.00usft North Reference: Reference Well: B-36 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore B -36A Database: Reference Design: B -36A WP07 Plus 500ft MD Offset ND Reference: Offset Design PB B Pad - B-36 - B -36A - B -36A WP07 Survey 9rogmm: 212-MWO, 11153-03970 Rater... Onset Measutetl Vertical Measured Varaul Onset Wellbore Centre Centhto NWh Oepm Depth Depth ♦WS tvm Caet,e lush Neftl Neftl Issm luslry Iusm lusftl 12,67500 8,970.00 12.675.00 8,9MOO 1,810.09 7,295.57 0.00 12.70000 8,9MW 12,700.00 8,97000 11833.40 7,301.60 0.00 12,T25.W 8,970.00 12,725.00 8,97000 1,858.81 7,31387 0.00 12.750.0) 8,970.00 12,750.00 8.970.03 1,M31 7,324.35 0.0) 12975.00 8,970.00 12,77500 8.9]0.00 1.901A2 7,338.00 O.M 12,900.00 8,97000 12,BM.W 8,970.00 1,922.90 7,348.80 000 12.8250) 0970.0) 12,825W 8,970.00 1,943.67 7,38270 000 12,89700 8.970.00 12.850.00 8,970.00 1,96869 7,377.66 097 12,87500 8,970.00 12.875.W 8,97000 1,902.90 7.393.66 0.00 12.90000 8,970W 12,900.00 8.97000 2,001.25 7,410.64 0.0) 12,625.00 09ID.W 12,925.00 5.970.W 2,01880 7.428.55 0.00 12.950.0) 8,970.00 12,950.M 8,97097 2,035.15 7,"7 36 0.03 12,975.03 8,970.00 12,975.00 8.970.W 2.050.62 7,187.00 0.0 13.0)0= 8,97000 13,03000 8.90.00 2.055.03 7,487.42 OM 13,025.00 8,970.00 13,035.00 8,970.00 2,078.38 7,50057 0.00 13,050.W 8,%9.99 13,050.00 8,96999 2,090.57 7.53039 0.00 13.075W 8.969.20 13,075.00 8,989.20 2,1M.19 7.552.50 OW 13,10000 8,987.13 13,10003 8,987.13 2,11358 7,574.65 0.00 13.12500 8,963.78 13,12500 8.98878 2,124.70 7,59639 0.00 13,150.W 8,959.15 13,15000 8.959.15 2,135.53 7,61894 0.00 13.175.00 8.953.27 13,17500 0,95827 2,146.M 7,84075 0M 13,XoW 8.918.14 13,200W 8.916.14 2,158.16 7,552.46 am 13,22500 8.937,86 13,22500 8.937.86 2.165.87 7,883.95 000 13,250.00 8,929.31 13,250.00 8,94431 2.17053 7.705.77 0.00 13,275W 8.SM75 13,27500 892075 2,182.01 7.728.05 000 13,300.03 8,91220 13,30).M 891220 2,18822 7,750.70 0.0) 13,32500 8,90885 13.325W 8,997.65 2,19.15 7,773.67 000 13,35000 8,8910 13,350.00 8,895.10 2,19819 7)96.87 0.00 13.375.00 0008.51 13,375.00 8,896.54 2,199.14 7,82024 0.00 13,40).W 08899 13,100.00 8,877.9 2.297.18 7,843]1 0.00 13,125.W 8,86914 13.42597 0099.44 2,199.92 7,867.20 OW 13,45000 8,860.89 13.45000 8,85189 2.1994 7,890.63 0.00 13,475.00 8,852.33 13.475.00 8,852.33 2.195.04 7,913.% 0.00 13,500.00 0643.78 13.500.W 8,84370 2,194.38 7,937.43 OW 13,52500 8.035.23 13,525.00 8,83523 2,194.19 7,960.92 0.0) 13,5WW 0,828.88 13.WO.W 8,821.88 2,1932 7,904.38 OM 13,57500 8.818.12 13,575.00 8,81812 2,19776 a=774 0.00 13,60000 8,8M.57 13,W0.00 8,809.57 2,201.50 8,030.93 0.00 13,82597 0801.02 13,625= 8.80102 2,206.52 8,053.88 0.0) 13.850.W 8,792.47 13,650M 8]92.47 2.212.82 8,075.51 OW 13.671.93 0.784.97 13,67193 8]81.97 2.21937 8.0904 000 BAKM Fig HUGRES Well B-36 Mean Sea Level ORIG KELLY BUSHING @ 76.91usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum 5372517 4:25..56PM Page 6 of 7 COMPASS 5000.1 Build 618 BP I/R\ by Anticollision Report BAM HUGH Company: North Amenca- ALASKA -BP Project: Prudhoe Bay Reference Site: PB B Pad Site Error: 0.00usft Reference Well: 8-36 Well Error: (loousft Reference Wellbore B -36A Reference Design: B -36A WP07 Plus 50011 MD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well B-36 Mean Sea Level ORIG KELLY BUSHING @ 76.91 usft (DOYON 16) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to ORIG KELLY BUSHING @ 76.91 usft Coordinates are relative to: B-36 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-U,, AK Central Meridian is 1501 0' 0.000 W - Grid Convergence at Surface is 1.25° &3/2017 4:25:58PM Page 7 of 7 COMPASS 5000.1 Build BIB Well Blank 'DR2-AC BOP Schematic 'late Quick Test Sub to Otis Top of 7" Otis O.Oft—.—.—.—.—.—._ _. —CDR] Rig's Drip Pan Distances from top of riser Excluding quick -test sub Top of Annular 0.0 ft 7-1/16" 6k Flange X 7" Otis Boz O Hydril 71/16" 0 Top Annular Element 0.7ft Annular Bottom Annular 2ft CL Blind/Shears 3.3 tt CL 2-3/8" Combi's 4.1 ft ~ Bs Deployment CL 3" PipelSlips 6.6 ft CL 2-3/8"x3-112" VBRs 7.4 ft B1 Kill Line CL Blind/Shears CL 2-318" Combi's CL of Top Swab CL of Bottom Swab CL Flow Tee CL of SSV CL of Master Valve LDS Gound Level 0 1o.on 10.7 ft � 13.3 ft F� Swab 2 1d.8 ft 4/ Swab 1 Ae T1 16.2 ft BOP2 77.5 ft Master 2 } Fusable 19.0 ft BON Master 1 T2 Test Pump Hose TRANSMITTAL LETTER CHECKLIST WELL NAME: / PTD: D72 (/ Development _ Service Exploratory Stratigraphic Test —Non -Conventional FIELD: l�Cl POOL: 7G� �- 6) I Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. API No. 50 - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- __ _-_ J from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company -Name Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Comfy Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(dx2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 davs; after com letion, sus ension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 KA PTD#� 2170730 Company BP EXPLORATION (ALASINC. _ Initial Class/Type Well Name: PRUDHOE BAY- NIT B36A Program DEV Well bore seg ❑ DEV / PEND_ GeoArea 899 Unit 11 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven, gas conforms to AS31,05.0300.1.A),(j.2.A-D) _ _ _ NA 1 Permit fee attached _ NA 2 Lease number appropriate_ _ _ - _ Yes Surf Loc &.Top Prod Int lie in ADL0028310; TD lies in ADL0028309. 3 Unique well name and number _ . _ _ Yes 4 Well located in a defined pool _ _ _ Yes PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341 F 5 Well located proper distance from drilling unit boundary. Yes CO 341 F, Rule 2: There shall be no restrictions as to well spacing. except that. no pay shall be _ 6 Well located proper distance from other wells. _ Yes opened in a well closer than 500 feet to the boundary of the affected. area. Planned well conforms to CO _ 7 Sufficient acreage available in. drilling unit Yes 341F, Rule 2. 8 If deviated, is wellbore plat. included Yes 9 Operator only affected party Yes _ 10 Operator has appropriate bond in force Yes Appr Date 11 Permit can be issued without conservation order Yes 12 Permit can be issued without administrative approval Yes SFD 5!8/2017 13 Can permit be approved before 15 -day wait Yes 14 Well located within area and strata authorized by Injection Order# (put 10# in. comments) (For NA 15 All wells within 1/4. mile area of review identified (For service well only) NA 16 Pre -produced injector: duration of pre -production less than 3 months (For service well only) NA 18 Conductor string_ provided NA Conductor set. in PBU B-36 Engineering 19 Surface casing protects all known USDWs NA Surface casing set in PBU B-36 20 CMT vol adequate to circulate on conductor & surf csg NA Surface casing set and fully cemented 21 CMT vol adequate to tie-in long string to surf csg. NA 22 CMT will cover all known_ productive horizons. Yes Productive. interval will be completed with cemented production liner 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig has steel tanks; all waste to approved disposal wells 25 If a_ re -drill, has a 10-403 for abandonment been approved Yes PTD 196-065, Sundry 317-184 26 Adequate wellbore separation proposed Yes Anti -collision anslysis complete; no major risk failures 27 If diverter required, does it meet regulations NA Appr Date 28 Drilling Fluid program schematic .& equip list adequate Yes Max formation pressure is 3318 psig(7.1 ppg EMW ); will drill w/ 8.4-9.5 ppg EMW; MPD utilized VTL 5/31/2017 29 SOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments). Yes MPSP is 2421 psig; will test BOPS. to 3500 psig 31 Choke manifold complies w/API. RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (For. service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No B -Pad wells are. H2S-bearing. H2S measures. are required. Geology 36 Data presented on potential overpressure zones Yes Planned drilling mud program (about 8.4 — 9.5 ppg) appears adequate to control operator's forecast Appr Date 37 Seismic analysis of shallow gas. zones NA pore pressure. gradient (about 7.1 ppg). Should higher pore pressures be encountered, SFD 5/8/2017 38 Seabed condition survey (if off -shore) NA BP has immediate access to nearby Fluid mixing facilities. 39 Contact name/phone for weekly progress reports. [exploratory only) NA Geologic Engineering Public Commissioner: Date: Commissioner: Date CommisDate ' ne