*Variance as per 20 AAC 25.112(i): Approved for alternate abandonment plug placement on parent
well contingent upon fully cemented liner and sealing whipstock on upcoming sidetrack.
*Window milling on service coil not approved on 10-403, refer to sidetrack PTD for approval.
Open hole window milling not to exceed 15'.
DSR-10/30/25
10/31/25
To: Alaska Oil & Gas Conservation Commission
From: William Long
Drilling Engineer
Date: October 18, 2025
Re:J-28A Sundry Request
Sundry approval is requested to set a whipstock in the J-28A wellbore as part of the drilling and
completion of the proposed J-28B CTD lateral.
Proposed plan:
Prior to drilling activities, screening will be conducted to drift for whipstock and MIT. E-line or coil will mill the XN-
nipple. E-line will set a 4-1/2" packer whipstock. Coil will mill window pre-rig. If unable to set the whipstock or mill
the window pre-rig, the rig will perform that work.
See J-28B PTD request for complete drilling details - A coil tubing drilling sidetrack will be drilled with the Nabors
CDR2 or CDR3 rig. The rig will move in and test BOPE. If unable to pre-rig, the rig will set the 4-1/2" packer
whipstock and mill a single string 3.80" window + 10' of formation. The well will kick off drilling in the Schublik and
lands in Ivishak Zone 2. The lateral will continue in Zone 2 to TD. The proposed sidetrack will be completed with a
3-1/2"x3-1/4"x2-7/8 13Cr solid liner, cemented in place and selectively perforated post rig (will be perforated with
rig if unable to post rig). This completion will completely isolate and abandon the parent Prudhoe Pool perfs.
20 AAC 25.112(i) Variance Request: Hilcorp requests to plug the existing perforations via the liner cement job,
packer whipstock and/or liner top packer, if the liner lap pressure test fails as an alternate plug placement.
The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of
the current wellbore and proposed sidetrack is attached for reference.
Pre-Rig Work: (Estimated to start in November 2025)
1. Slickline : Dummy WS drift
2. E-Line : Set 4-1/2" Packer Whipstock at 10,765 MD at 180 degrees ROHS
3. Fullbore : MIT-IA and/or MIT-T to 2,500 psi (min)
4. Coil : Mill XN nipple (at 10,495' MD) and 3.80" Single String 4.5" Window (if window
not possible, mill with rig).
5. Valve Shop : Pre-CTD Tree Work
6. Operations : Remove wellhouse and level pad.
Rig Work: (Estimated to start in December 2025)
Reference J-28B Permit submitted in concert with this request for full details.
1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,383 psi). Give AOGCC 24hr notice
prior to BOPE test.
2. Mill 3.80 Single String 4-1/2" Window (if not already done pre-rig)
3. Drill build section: 4.25" OH, ~511' (27 deg DLS planned).
4. Drill production lateral: 4.25" OH, ~2490' (12 deg DLS planned). Swap to KWF for liner.
5. Run 3-1/2 x 3-1/4 x 2-7/8 13Cr solid liner
6. Pump primary cement job*: 38 bbls, 15.3 ppg Class G, 1.24 (ft3/sk), TOC at TOL. Set LTP*. If high
losses are encountered during cement job and it is deemed necessary, a cement down squeeze from
TOL to loss zone will be performed with the rig or service coil (if performed by service coil see future
sundry).
7. Only if not able to do with service coil extended perf post rig Perforate Liner with 1-1/4" CS Hydril
8. Freeze protect well to a min 2,200' TVD.
9. Close in tree, RDMO.
* Alternate plug placement variance request per 20 AAC 25.112(i)
Post Rig Work:
1. Valve Shop : Valve & tree work
2. Slickline : Set LTP* (if necessary). Set live GLVs.
3. Service Coil : Post rig RPM, CBL and perforate (~200) - see extended perf procedure
attached.
4. Testing : Portable test separator flowback.
William Long CC: Well File
Drilling Engineer Joe Lastufka
907-263-4372
Well Date
Quick Test Sub to Otis -
Top of 7" Otis 0.0 ft
Distances from top of riser
Excluding quick-test sub
Top of Annular
CL Annular
Bottom Annular
CL Blind/Shears
CL Coiled Tubing Pipe / Slips
Kill Line Choke Line
CL BHA Pipe / Slip
CL Coiled Tubing Pipe / Slips
TV1 TV2
T1 T2
Flow Tee
Master
Master
LDS
IA
OA
LDS
Ground Level
CDR#-AC BOP Schematic
CDR Rig's Drip Pan
Fill Line
Normally Disconnected
HP hose
to Micromotion
LP hose open ended
to Flowline (optional)
Hydril 7 1/16"
Annular
Blind/Shear
CT Pipe/Slips
2 3/8" Pipe/Slips
2 3/8" Pipe/Slips
7-1/16"
5k Mud
Cross
CT Pipe/Slips
BHA Pipe / Slips
nneeeeeceeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU J-28A
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
217-075
50-029-21721-01-00
15750
Conductor
Surface
Intermediate
Liner
Liner
8608
80
2046
2907
7882
5253
13100
20"
13-3/8"
9-5/8"
7"
4-1/2"
8685
49 - 129
48 - 2682
46 - 2953
2787 - 10669
10495 - 15748
49 - 129
48 - 2682
46 - 2952
2787 - 8634
8492 - 8608
None
2670
4760
5410
7500
13100, 15000
5380
6870
7240
8430
11920 - 15520
4-1/2" 12.6# 13cr85 44 - 10512
8681 - 8611
Structural
4-1/2" HES TNT Perm Packer
10389
8404
Torin Roschnger
Operations Manager
Aras Worthington
aras.worthington@hilcorp.com
907-564-4763
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028282
44 - 8507
N/A
N/A
402
282
48448
43318
24
50
2005
650
947
880
N/A
13b. Pools active after work:PRUDHOE OIL
No SSSV Installed
10389, 8404
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2024.07.18 14:38:11 -
08'00'
Torin
Roschinger
(4662)
By Grace Christianson at 3:38 pm, Jul 18, 2024
WCB 9-30-2024
RBDMS JSB 072524
DSR-7/18/24
ACTIVITY DATE SUMMARY
7/8/2024
LRS CTU #2 - 2.0" Coil
Job Obective: Set CIBP
MIRU CTU. Perform weekly BOP test.
...Continued on WSR 7-9-24...
7/9/2024
LRS CTU #2 - 2.0" Coil ***Cont. from WSR 7-8-24***
Job Obective: Set CIBP
Complete weekly BOP test. Make up CIBP drift BHA with 3.60" DJN. RIH. Load well
with 170bbls KCL. Tag CIBP @ 15,000' POOH, M/U NS 4.5" CIBP. RIH set at
13,100'. POOH. Freeze protect well with 38bbls diesel. L/D tools, Recover ball.
RDMO
...Job Complete..........
Daily Report of Well Operations
PBU J-28A
M/U NS 4.5" CIBP. RIH set at
13,100'. POOH
CIBP is correctly shown on WBS below. -WCB
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU J-28A
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
217-075
50-029-21721-01-00
15750
Conductor
Surface
Intermediate
Liner
Liner
8608
80
2046
2907
7882
5253
15000
20"
13-3/8"
9-5/8"
7"
4-1/2"
8631
49 - 129
48 - 2682
46 - 2953
2787 - 10669
10495 - 15748
49 - 129
48 - 2682
46 - 2952
2787 - 8634
8492 - 8608
None
2670
4760
5410
7500
15000
5380
6870
7240
8430
11920 - 15520
4-1/2" 12.6# 13cr85 44 - 10512
8681 - 8611
Structural
4-1/2" HES TNT Perm Packer 10389, 8404
10389
8404
Torin Roschnger
Operations Manager
Aras Worthington
aras.worthington@hilcorp.com
907-564-4763
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028282
44 - 8507
N/A
N/A
383
402
44134
48448
20
24
1993
2005
1038
947
N/A
13b. Pools active after work:PRUDHOE OIL
No SSSV Installed
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 1:26 pm, Apr 04, 2024
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662),
ou=Users
Date: 2024.04.04 12:41:17 -08'00'
Torin
Roschinger
(4662)
DSR-4/12/24
RBDMS JSB 041024
WCB 2024-07-09`
ACTIVITY DATE SUMMARY
2/17/2024
***WELL S/I ON ARRIVAL***
DRIFT W/ 4-1/2" XN LOCATOR, 1-3/4" SAMPLE BAILER DEVIATE OUT @ 11,060'
SLM (44' correction 11,104' MD)
RUN SBHP'S SEE LOG FOR DETAILS
***WELL LEFT S/I***
3/29/2024
Coil Unit #9 1.75" Coil .156" WT Dura-Coil. Job Scope = Drift & Set CIBP
Mobilize CTU 9.
***Continue on WSR 3/30/24***
3/30/2024
Coil Unit #9 1.75" Coil .156" WT Dura-Coil. Job Scope = Drift & Set CIBP ***Job
continued form 3/29/24***
MIRU CTU 9. Pump 1.188" Drift Ball. BOP Test. Pass on the BOP test. Ball
recovered. MU NS MHA and 3.69" drift nozzle. Load the well with KCL and safelube.
RIH to 15,200' ctmd. Pulled heavy 10,470' ctmd, had to work past by pumping down
the tubing at a high rate and it popped through. Likely the tubing tail. Continue OOH.
Perform gas release below the BOP drill. BD Slb Drift BHA. PT NS MHA. MU NS
4.5" CIBP. RIH to 15,000' CTM. Launch 1/2" ball.
***Continue on WSR 3/31/24***
3/31/2024
Coil Unit #9 1.75" Coil .156" WT Dura-Coil. Job Scope = Drift & Set CIBP ***Job
continued form 3/30/24***
Set NS 4.5" CIBP @ 15,000' CTM. POOH. FP well. RDMO
***Job Complete***
Daily Report of Well Operations
PBU J-28A
Set NS 4.5" CIBP @ 15,000' CTM. POOH.
MU NS g
4.5" CIBP. RIH to 15,000' CTM. Launch 1/2" ball.
CIBP is correctly shown on the new WBS, below. -WCB
DATA SUBMITTAL COMPLIANCE REPORT
1/16/2018
Permit to Drill
2170750 Well Name/No.
PRUDHOE BAY UNIT J -28A IF 13 L Operator
BP EXPLORATION (ALASKA) INC. API No. 50-029-21721-01-00
MD 15750
TVD 8608 Completion Date 7/15/2017 Completion Status
1-0IL Current Status 1 -OIL UIC No
REQUIRED INFORMATION
Mud Log No
Samples No ✓
Directional Survey Yes
DATA INFORMATION
List of Logs Obtained: MWD/GR/RES/DEN/NEU
(from Master Well Data/Logs)
Well Log Information:
Log/
Electr
Data Digital
Dataset
Log Log Run Interval
OH /
Type Med/Frmt
Number Name
Scale Media No Start Stop
CH Received
Comments
ED C
28564 Digital Data
2911 15750
9/7/2017
_
Electronic Data Set, Filename: J-
28A_BHI LTK_MEM _Composite FE Drifting
Data.las
ED C
28564 Digital Data
9/7/2017
Electronic File: J-28A_BHI_LTK_2MD_Memory ,
Drilling Log.cgm
ED C
28564 Digital Data
9/7/2017
Electronic File: J-
28A_BHI_LTK_2TVDSS_Memory Drilling -
Log.cgm
ED C
28564 Digital Data
9/7/2017
Electronic File: J-28A_BHI_LTK_5MD_Memory
Drilling Log.cgm
ED C
28564 Digital Data
9/7/2017
Electronic File: J-
28A_BHI_LTK_5TVDSS_Memory Drilling
Log.cgm
ED C
28564 Digital Data
9/7/2017
Electronic File: J -28A BHI STK
IMAGE(6.125)_Composite_5MD_Memory Drilling ,
Log.cgm
ED C
28564 Digital Data
9/7/2017
Electronic File: J-
28A_BHI LTK_Mem_Composite_FE Drilling
Data.dlis
ED C
28564 Digital Data
9/7/2017
Electronic File: J-28A_BHI_LTK_2MD_Memory ,
P
Drilling Log.pdf
ED C
28564 Digital Data
9/7/2017
Electronic File: J- -
r
28A_BHI_LTK_2TVDSS_Memory Drilling Log.pdf
ED C
28564 Digital Data
9/7/2017
Electronic File: J-28A_BHI_LTK_5MD_Memory
�1
r
Drilling Log.pdf
ED C
28564 Digital Data
9/7/2017
Electronic File: J -
n
1"
28A_BHI_LTK_5TVDSS_Memory Drilling Log.pdf
AOGCC
Page 1 of
Tuesday, January 16, 2018
DATA SUBMITTAL COMPLIANCE REPORT
1116/2018
Permit to Drill
2170750 Well Name/No. PRUDHOE BAY UNIT J -28A Operator
SP EXPLORATION (ALASKA) INC. API No. 50-029-21721-01-00
MD
15750
TVD 8608 Completion Date 7/15/2017 Completion Status
1 -OIL Current Status 1 -OIL UIC No
ED
C
28564 Digital Data
9/7/2017
Electronic File: J-28A_BHI STK IMAGE (6.125) ,
Composite _5MD_Memory Drilling Log.pdf
ED
C
28564 Digital Data
9/7/2017
Electronic File: J -28A AOGCC Offset Report.pdf
ED
C
28564 Digital Data
9/7/2017
Electronic File: J-28A_BHI_Final Survey.
Report.pdf
ED
C
28564 Digital Data
9/7/2017
Electronic File: J-28A_BHI_Final Survey '
Report.txt
ED
C
28564 Digital Data
9/7/2017
Electronic File: J-28A_BHI _Final Surveys.csv -
Log
C
28564 Log Header Scans 0 0
2170750 PRUDHOE BAY UNIT J -28A LOG
HEADERS
Log
C
28565 Log Header Scans 0 0
2170750 PRUDHOE BAY UNIT J -28A PB1 LOG
HEADERS
ED
C
28565 Digital Data 2911 13611
9/7/2017
Electronic Data Set, Filename: J-
28APB1 BHI_LTK_Memory_Composite_FE
Drilling Data.las
ED
C
28565 Digital Data
9/7/2017
Electronic File: J-
28APB1_BHI _LTK_2MD_Memory Drilling -
Log.cgm
ED
C
28565 Digital Data
917/2017
Electronic File: J-
28APB1_BHI _LTK_2TVDSS_Memory Drilling
Log .cgm
ED
C
28565 Digital Data
9/7/2017
Electronic File: J-
28APB1_BHI_LTK_5MD_Memory Drilling Log -
.cgm
ED
C
28565 Digital Data
9/7/2017
Electronic File: J-
28APB1_BHI _LTK_5TVDSS_Memory Drilling
Log .cgm
ED
C
28565 Digital Data
9/7/2017
Electronic File: J-28APB1 BHI STK
IMAGE(6.125)_Composite_5MD_Memory Drilling
Log.cgm
ED
C
28565 Digital Data
9/7/2017
Electronic File: J-
28APB1_BHI _LTK Memory_Composite FE
Drilling Data.dlis
ED
C
28565 Digital Data
9/7/2017
Electronic File: J-
28APB1_BHI _LTK_2MD_Mmecry Drilling Log.pdf
ED
C
28565 Digital Data
9/7/2017
Electronic File: J-
-
Q
28APB1_BHI_LTK_2TVDSS_Memory Drilling.
Log.pdf
AOGCC
Page 2 of 4
Tuesday, January 16, 2018
DATA SUBMITTAL COMPLIANCE REPORT
1/16/2018
Permit to Drill 2170750 Well Name/No. PRUDHOE BAY UNIT J -28A
MD 15750 TVD 8608
ED C 28565 Digital Data
ED C 28565 Digital Data
ED C 28565 Digital Data
ED C 28565 Digital Data
ED C 28565 Digital Data
ED C 28565 Digital Data
ED C 28565 Digital Data
Well Cores/Samples Information:
Name
INFORMATION RECEIVED
Completion Report e)
Production Test Information Y / JCA
Geologic Markers/Tops V
COMPLIANCE HISTORY
Completion Date: 7/15/2017
Release Date: 5/18/2017
Description
Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21721-01-00
Completion Date 7/15/2017 Completion Status 1 -OIL Current Status 1 -OIL UIC No
9/7/2017
-
Electronic File: J-
AI)
P
28APB1 BHI LTK 5MD Memory Drilling Log.pdf-
9/7/2017
Electronic File: J-
19
28APB1_BHI_LTK_5TVDSS_Memory Drilling
Log.pdf
9/7/2017
Electronic File: J-28APB1_BHI
_STK
Image(6.125)Composite5M_D_Memory Drilling -
Log.pdf
9/7/2017
Electronic File: J-28APB1_BHI_Final Survey ,
Report.pdf
9/7/2017
Electronic File: J-28APB1_BHI_Final Survey,
Report.txt
9/7/2017
Electronic File: J-28APB1_BHI_Final Surveys.csv
9/7/2017
Electronic File: J-28APB1_BHI _Final Surveys.xls-
Sample
Interval Set
Start Stop Sent Received Number
Comments
Directional / Inclination DataY Y 1 Mud Logs, Image Files, Digital Data Y / hCEN Core Chips Y /
Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files e) Core Core Photographs Y /
Daily Operations Summary D Cuttings Samples Y//rvHy Laboratory Analyses Y A
Date Comments
AOGCC Page 3 of 4 Tuesday, January 16, 2018
DATA SUBMITTAL COMPLIANCE REPORT
111 612 01 8
Permit to Drill 2170750 Well Name/No. PRUDHOE BAY UNIT J -28A Operator BP EXPLORATION (ALASKA) INC.
MD 15750 TVD 8608 Completion Date 7/15/2017 Completion Status 1 -OIL Current Status 1 -OIL
Comments:
Compliance
API No. 50-029-21721-01-00
UIC No
Date: d//q//B
AOGCC Page 4 of 4 Tuesday, January 16, 2018
BA ER 0 PRINT DISTRIBUTION LIST
F�GHES
a GE company
COMPANY BP Exploration Alas l WL
a VEL
WELL NAME J -28A
FIELD Prudhoe Bay Unit JAN 19 2018
COUNTY PRUDHOE BAY f4, 0- C
BHI DISTRICT
Alaska
21 7075
2 B-91*
5ro,y
ase sign and return one copy of this transmittal form to:
Exploration (Alaska) Inc. DATA LOGGED
rotechnical Data Center, 1-112-1 '.1_ /6 /20111
wl K BENDER
E. Benson Blvd. 7-11
;horage, Alaska 99508 or AKGDMINTERNAL@bp.com
LOG TYPE GR-RES-DEN-NEU
STK:Image Log
LOG DATE July 7. 2017
AUTHORIZED BY Paul Canizares
EMAIL Paul.Canizare�m TODAYS DATE January 18, 2018
Revision
STATUS Rev Replacement: CD Details: Corrected Survey Files.
Rev. Requested by: Gerardo Cedillo
1
COMPANY
ADDRESS (FEDE% WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
V
4, PBOC, PRB-20 (Office 109)
C Wells Project Aides
n Benda Glassmaker & Peggy O'Neil
E. Benson Blvd.
horage, Alaska 99508
2 ConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 3-344
700 G Street
Anchorage, AK 99510
3 ExxonMubil, Alaska
Attn: Lynda M. Yaskell and/or Lisa Boggs
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska - AOGCC
Attn: Stephen Davies / Makana Bender
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR - Division of Oil & Gas ***
Attn: Garret Brown
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
*** Stamp "confidential" on all material deliver to DNR
6 BP Exploration (Alaska) Inc.
Petrotecfinical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Attn: Gerardo Cedillo
FIELD
FINAL
CD/DVDFINAL
PRELIM
LOGS
(las, dlis, PDF, META,
SURVEY
REPORT
LOGS
CGM, Final Suryeys)
(Compass)
# OF PRINTSUr
rMIN
# OF COPIES
1# OF COPIES
I# OF COPIES
4 41 lu
C+i
0 0 --i-----F 0 0
0 1 D 1 0 1 0 0
RECEIVED
AOGCC;
TOTALS FOR THIS PAGE: 0 0 1 0 0
SEP 01 2011
BAM(g0 A01PPrDISTRIBUTION LIST
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME J -28A
FIELD Prudhoe Bay Unit
COUNTY PRUDHOE BAY
BHI DISTRICT Alaska
AUTHORIZED BY Paul Cani2ares
EMAIL Paul.Canizares@bhoe.com
21 7075
28564
ase sign and return one copy of this transmittal form to:
Exploration (Alaska) Inc. DATA LOGGED
rotechnical Data Center, LR2-1 9 A\./201 i
) E. Benson Blvd. M, K. BENDER
:horage, Alaska 99508 or AKGDMINTERNAL@bp.com
LOG TYPE GR-RES-DEN-NEU
STK:Image Log
LOG DATE July 8, 2017
TODAYS DATE August 25, 2017
Revision
STATUS Final Replacement: No Details:
Rev. Requested by:
COMPANY
ADDRESS (FEDEXVWL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
U
t 1 BP North Slope.
EOA, PBOC, PRB-20 (Offlce 109)
i D&C Wells Pmject Aides
i Attn: Benda Glassmaker & Peggy O'Neil
900 E. Benson Blvd.
;Anchorage, Alaska 99508
2 CorwcoPhillips Alaska Inc.
Atm: Ricky Elgarico
G Street
honee. AK
3 ExxonMobil. Alaska
iAun: Lynda M. Yaskell and/or Lisa Boggs
:3201 C Street. Suite 505
Anclo raze, AK 99503
r of Alaska -AOGCC
r. Makin Bender
W. 7th Ave, Suite 100
hornet, Alaska 99501
t -Division of OD&Gas —
: Garret Brown
West 7th Avenue. Suite 1100
hornet. Alaska 99501
Exploration (Alaska) Inc.
,ntecheical Data Center, Lli
E. Benson Blvd.
horaee. Alaska 99508
FIELD I
FINAL
CD/DVD FINAL
PRELIMLOGS
I
(las, tills, PDF, META, SURVEY
REPORT
LOGS
CGM, Final Surveys) (Compass)
# OF PRINTS
# OF COPIES # OF ES COPI
# OF COPIES
TOTALS FOR THIS PAGE: 0 2 5 4 0
bp
RECEIVED
SEP 0 7 2017
AOGCC
North America - ALASKA - BP
Prudhoe Bay
PB J Pad
J-28
J -28A
500292172101
Design: J -28A
Final Survey Report
11 July, 2017
BA ER
F UGHES
a GE company
21 7075
28564
byFinal
PB J Pad, TR -11-13
BP
Survey Report
�'I 'P'MS
Company:
Project:
Site:
North America - ALASKA -BP
Prudhoe Bay
PB J Pad
Local Coordinate Reference:
TVD Reference:
MD Reference:
Well J-28
J-28AActual (d 65.87usft (Parker 272 Actual)
J-28A Actual @ 85.87usft (Parker 272 Actual)
Well:
J-28
North Reference:
True
Wellbore:
J-28A
Survey Calculation Method:
Minimum Curvature
Design:
J-28A
Database:
EDM RSK- Alaska PROD -ANCP7
Project Prudhoe Bay, GPB, PRUDHOE BAY
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27. OGP-Usa AK (4267.15864] Using Well Reference Point
Map Zone: NAD27' OGP-Usa AK /Alaska zone 4 [26734'1586, Using geodetic scale factor
Site
PB J Pad, TR -11-13
Site Position:
Northing:
5,968,224.220 usft
Latitude:
70° 19' 14.645 N
From:
Map
Easting:
641,155.790 usft
Longitude:
148° 51'20.092 W
Position Uncertainty:
0.00 usft
Slot Radius:
0.000 in
Grid Convergence:
1.08 `
Well
J-28, J-28
Well Position
+N/S 0.00 usft
Northing:
5,970,537.000 usft
Latitude:
70° 19'37.316 N
+E/ -W 0.00 usft
Easting:
642,621.000 usft
Longitude:
148' 50'36.055 W
Position Uncertainty
0.00 usft
Wellhead Elevation:
39.52 usft
Ground Level:
39.07 usft
Wellbore
J -28A
Magnetics
Model Name Sample Date
Declination
Dip Angle Field Strength
(nT)
BGGM2016 7/1/2017
17.78
81.01
57,551
Design
J -28A
Audit Notes:
Version:
1.0 Phase:
ACTUAL
Tie On Depth: 11,283.21
Vertical Section:
Depth From (TVD)
+N/ -S
+EPW
Direction
(usft)
(usft)
(usft)
(')
46.35
0.00
0.00
277,75
7/112017 1026:45AM Page 2 COMPASS 50001 Build 81D
BP
Final Survey Report
BA ER
F�V,q, S
Company: North America -ALASKA - BP
Local Coordinate Reference:
Well J-28
Project. Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Site: PS J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well: J-28
North Reference:
True
Wellbore: J -28A
Survey Calculation Method:
Minimum Curvature
Design: J -28A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey Program
Date 7/11/2017
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
108.76
2,908.76 J-28 Srvy 1 BOSS -MS (J-28PB1)
BOSS -GYRO
Sperry -Sun BOSS gyro multishot
2,953.00
3,706.00 Gyrodata SS 8-1/2" (J-28APB1)
GYD-GC-SS
Gyrodata gyro
single shots
3,801.81
10,630.03 BHI ATK MWD 8-1/2'X9-7/8"(J-28APB1)
MWD+IFR+MS-WOCA
MWD + IFR +Multi Station W/O Crustal
10,683.54
11,283.21 BHI OTK MWD 6-1/8"(J-28APB1)
MWD+IFR+MS-WOCA
MWD + IFR
+ Multi Station W/O Crustal
11,302.76
15,706.98 BHI OTK MWD 6 -1/8"(J -28A)
MWD+IFR+MS-WOCA
MWD +IFR+Multi Station W/O Crustal
Survey
MD
Inc Azi (azimuth) TVD
TVDSS
NIS
EIW
Northing
Easgng
DLeg V. Sec
(usft)
0 V) (usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft) (watt)
46.35
0.00 0.00
46.35
-39.52
0.00
0.00
5,970,537.000
642,621.000
0.00
0.00
108.76
0.18 129.40
108.76
22.89
-0.06
0.08
5,970,536.939
642,621.077
0.29
-0.08
208.76
0.13 87.19
208.76
122.89
-0.16
0.31
5,970,536.850
642,621.313
0.12
-0.33
308.76
0.18 125.70
308.76
222.89
-0.24
0.55
5,970,536.768
642,621.556
0.11
-0.58
408.76
0.10 62.80
408.76
322.89
-0.29
0.76
5,970,536.720
642,621.762
0.16
-0.79
508.76
0.13 94.61
508.76
422.89
-0.26
0.95
5,970,536.755
642,621.952
0.07
-0.97
608.76
0.12 156.50
608.76
522.89
-0.37
1.10
5,970,536.652
642,622.109
0.13
-1.14 _
708.76
0.08 86.60
708.76
622.89
-0.46
1.21
5,970,536.563
642,622.222
0.12
-1.2f
808.76
0.10 72.80
808.76
722.89
-0.43
1.37
5,970,536.596
642,622.374
0.03
-1.41
908.76
0.10 119.31
908.76
822.89
-0.45
1.53
5,970,536.582
642,622.534
0.08
-1.57
1,008.76
0.00 0.00
1,008.76
922.89
-0.49
1.60
5,970,536.540
642,622.611
0.10
-1.65
1,108.76
0.25 352.61
1,108.76
1,022.89
-0.27
1.57
5,970,536.756
642,622.579
0.25
-1.60
1,208.76
0.05 356.50
1,208.76
1,122.89
-0.01
1.54
5,970,537.015
642,622.543
0.20
-1.53
1,308.76
0.10 12.89
1,308.76
1,222.89
0.11
1.56
5,970,537.144
642,622.558
0.05
-1.53
1,408.76
0.02 177.11
1,408.76
1,322.89
0.18
1.58
5,970,537.212
642,622.577
0.12
-1.54
1,508.76
0.15 287.70
1,508.76
1,422.89
0.20
1.46
5,970,537.232
642,622.452
0.16
-1.42
1,608.76
0.18 258.30
1,608.76
1,522.89
0.21
1.18
5,970,537.235
642,622.174
0.09
-1.14
1,708.76
0.10 292.00
1,708.76
1,622.89
0.21
0.94
5,970,537.231
642,621.939
0.11
-0.91
1,808.76
0.22 262.30
1,808.76
1,722.89
0.22
0.67
5,970,537.233
642,621.668
0.14
-0.64
7111/2017 10.26r45AM
Page 3
COMPASS 5000.1 Build 81D
+00
= by
B
Final Survey Report
B"F�VE
Company: North America -ALASKA -BP
Local Co-ordinate Reference:
Well J-28
Project Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actua0
Site: PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well: J-28
North Reference:
True
Wellbore: J -28A
Survey Calculation Method:
Minimum Curvature
Design: J -28A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. JOX
(usft)
(°)
(°)
(usft)
(usft)
(usft)
Wall)
(usft)
(usft)
(°7100usft)
(u
1,908.76
0.22
318.11
1,908.76
1,822.89
0.34
0.35
5,970,537.344
642,621.347
0.21
2,008.76
0.28
341.40
2,008.75
1,922.88
0.71
0.15
5,970,537.715
642,621.134
0.12
-0.0:
2,108.76
0.33
346.00
2,108.75
2,022.88
1.22
0.00
5,970,538.223
642,620.977
0.06
0.16
2,208.76
0.12
355.40
2,208.75
2,122.88
1.61
-0.08
5,970,538.605
642,620.891
0.21
0.29
2,308.76
0.07
315.50
2,308.75
2,222.88
1.75
-0.13
5,970,538.752
642,620.837
0.08
0.36
2,408.76
0.10
25.30
2,408.75
2,322.88
1.88
-0.13
5,970,538.874
642,620.830
0.10
0.39
2,508.76
0.10
154.40
2,508.75
2,422.88
1.88
-0.06
5,970,538.876
642,620.905
0.18
0.31
2,608.76
0.18
102.40
2,608.75
2,522.88
1.77
0.13
5,970,538.767
642,621.098
0.14
0.11
2,676.76
0.09
32.99
2,676.75
2,590.88
1.79
0.26
5,970,538.792
642,621.231
0.25
-0.02
13 318"
2,708.76
0.13
355.40
2,708.75
2,622.88
1.84
0.28
5,970,538.849
642,621.241
0.25
-0.02
2,758.76
2.88
308.11
2,758.73
2,672.86
2.68
-0.72
5,970,539.662
642,620.232
5.59
1.07
2,808.76
4.02
303.40
2,808.64
2,722.77
4.42
-3.17
5,970,541.355
642,617.748
2.35
3.74
2,858.76
4.57
300.40
2,858.50
2,772.63
6.39
-6.35
5,970,543.267
642,614.530
1.19
7.15
2,908.76
5.07
298.70
2,908.32
2,822.45
8.46
-10.01
5,970,545.266
642,610.836
1.04
11.06
2,953.00
5.83
300.05
2,952.36
2,866.49
10.52
-13.67
5,970,547.260
642,607.138
1.74
14.96
2,954.21
5.82
301.58
2,953.56
2,867.69
10.59
-13.77
5,970,547.321
642,607.031
12.89
15.0'
9518..
2,967.00
5.92
317.73
2,966.29
2,880.42
11.41
-14.77
5,970,548.129
642,606.020
12.89
16.17
2,999.00
7.15
322.01
2,998.08
2,912.21
14.20
-17.10
5,970,550.875
642,603.632
4.13
18.86
3,035.00
9.32
326.01
3,033.71
2,947.84
18.39
-20.11
5,970,555.000
642,600.544
6.23
22.41
3,065.00
11.12
329.72
3,063.23
2,977.36
22.90
-22.93
5,970,559.458
642,597.642
6.39
25.81
3,095.00
12.42
333.01
3,092.60
3,006.73
28.27
-25.85
5,970,564.774
642,594.617
4.88
29.43
3,126.00
13.16
335.35
3,122.83
3,036.96
34.45
-28.84
5,970,570.894
642,591.516
2.91
33.22
3,216.00
15.80
346.72
3,209.98
3,124.11
55.70
-35.93
5,970,591.998
642,584.024
4.30
43.11
3,246.00
16.86
350.15
3,238.77
3,152.90
63.96
-37.61
5,970,600.226
642,582.184
4.78
45.69
3,276.00
17.50
351.46
3,267.43
3,181.56
72.70
-39.02
5,970,608.944
642,580.604
2.49
48.47
7/112017 10:26:45AM Page 4 COMPASS 5000.1 Build 81D
r
by
'►N`
BP
Final Survey Report
BAFUGHES
cE�omw�v
Company: North America -ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project: Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Site: PS J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well: J-28
North Reference:
True
Wellbore: J -28A
Survey Calculation Method:
Minimum Curvature
Design: J -28A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft)
(•)
(•)
(usft)
(usft)
(usft)
(usft)
tysft)
(usft)
(•1100usft)
(usft)
3,306.00
18.86
353.72
3,295.93
3,210.06
81.99
-40.22
5,970,618.200
642,579.228
5.11
50.9',
3,336.00
19.73
353.70
3,324.25
3,238.38
91.84
-41.31
5,970,628.030
642,577.955
2.90
53.32
3,406.00
22.08
357.62
3,389.64
3,303.77
116.73
43.15
5,970,652.882
642,575.639
3.91
58.50
3,506.00
24.59
4.14
3,481.47
3,395.60
156.28
-42.43
5,970,692.429
642,575.609
3.60
63.12
3,605.00
27.53
9.21
3,571.30
3,485.43
199.86
-37.23
5,970,736.097
642,579.982
3.69
63.84
3,706.00
30.46
12.95
3,658.77
3,572.90
247.38
-27.85
5,970,783.792
642,588.458
3.44
60.95
3,801.81
32.23
12.39
3,740.59
3,654.72
296.01
-16.92
5,970,832.612
642,598.456
1.87
56.68
3,865.93
34.83
13.63
3,794.04
3,708.17
330.51
-8.94
5,970,867.256
642,605.784
4.19
53.42
3,960.44
39.21
15.07
3,869.48
3,783.61
385.61
5.20
5,970,922.613
642,618.867
4.72
46.85
4,055.57
43.83
15.81
3,940.69
3,854.82
446.38
22.00
5,970,983.679
642,634.509
4.88
38.40
4,149.28
47.24
16.40
4,006.32
3,920.45
510.62
40.56
5,971,048.256
642,651.842
3.67
28.67
4,243.75
50.29
17.18
4,068.58
3,982.71
578.62
61.09
5,971,116.631
642,671.074
3.29
17.50
4,339.62
53.49
18.13
4,127.74
4,041.87
650.48
83.97
5,971,188.913
642,692.590
3.43
4.51
4,434.38
56.88
19.03
4,18144
4,095.97
724.21
108.77
5,971,263.092
642,715.978
3.66
-10.12
4,529.38
58.04
19.13
4,232.94
4,147.07
799.90
134.95
5,971,339.255
642,740.712
1.22
-25.85
4,624.25
57.99
19.00
4,283.19
4,197.32
875.95
161.23
5,971,415.789
642,765.544
0.13
-41.64
4,719.07
57.95
18.80
4,333.48
4,247.61
952.00
187.27
5,971,492.316
642,790.130
0.18
-57.18
4,813.53
58.06
19.23
4,383.53
4,297.66
1,027.74
213.37
5,971,568.532
642,814.785
0.40
-72.83
4,907.71
57.94
20.09
4,433.43
4.347.56
1,102.95
240.24
5,971,644.236
642,840.219
0.78
-89.32
5,001.45
57.97
20.23
4,483.17
4,397.30
1,177.54
267.63
5,971,719.326
642,866.179
0.13
-106.39
5,096.94
58.02
19.91
4,533.78
4,447.91
1,253.60
295.42
5,971,795.893
642,892.514
0.29
-123.67
5,191.76
58.08
19.87
4,583.96
4,498.09
1,329.26
322.79
5,971,872.050
642,918.441
0.07
-140.59
5,286.22
58.07
19.70
4,633.91
4,548.04
1,404.70
349.93
5,971,947.986
642,944.138
0.15
-157.31
5,380.85
58.02
19.22
4,683.99
4,598.12
1,480.40
376.68
5,972,024.178
642,969.441
0.43
-173.60
5,475.24
58.06
19.21
4,733.96
4,648.09
1,556.02
403.03
5,972,100.280
642,994.353
0.04
-189.52
5,570.10
57.95
19.66
4,784.22
4,698.35
1,631.89
429.80
5,972,176.635
643,019.672
0.42
-205.81
5,664.58
58.05
19.91
4,834.28
4,748.41
1,707.28
456.92
5,972,252.525
643,045.353
0.25
-222.52
7/11/2017 10: 26'45AM Page 5 COMPASS 5000.1 Build BID
h
b
Final
BP
Survey Report
BA ER
F UGtq 0
cE,ompnm
�=
Company: North America
- ALASKA - BP
Local Co-ordinate
Reference:
Well J-28
Project: Prudhoe Bay
ND Reference:
J-28AActual @ 85.87usft
(Parker 272
Actual)
Site: PB J Pad
MD Reference:
J-28AActual P 85.87usft
(Parker 272
Actual)
Well: J-28
North Reference:
True
Wellbore: J -28A
Survey Calculation
Method:
Minimum Curvature
Design: J -28A
Database:
EDM RSK- Alaska
PROD -ANCPI
Survay,
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easgng
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/loousft)
(usft)
5,758.29
57.93
19.66
4,883.96
4,796.09
1,782.05
483.82
5,972,327.788
643,070.823
0.26
-239.09
5,853.62
57.76
19.31
4,934.69
4,848.82
1,858.14
510.74
5,972,404.365
643,096.290
0.36
-255.5C
5,947.16
57.75
19.33
4,984.60
4,896.73
1,932.79
536.91
5,972,479.502
643,121.039
0.02
-271.37
6,042.58
57.94
19.89
5,035.38
4,949.51
2,008.89
564.03
5,972,556.095
643,146.698
0.54
-267.97
6,137.28
57.86
19.81
5,085.71
4,999.84
2,084.35
591.27
5,972,632.049
643,172.497
0.11
-304.79
6,231.80
57.80
20.58
5,136.03
5,050.16
2,159.44
618.89
5,972,707.644
643,198.682
0.69
-322.03
6,326.45
57.84
21.05
5,186.44
5,100.57
2,234.32
647.35
5,972,783.047
643,225.719
0.42
-340.14
6,421.21
57.76
21.50
5,236.94
5,151.07
2,309.04
676.45
5,972,858.301
643,253.386
0.41
-358.89
6,515.82
57.83
21.42
5,287.36
5,201.49
2.383.54
705.74
5,972,933.342
643,281.250
0.10
-377.87
6,610.67
57.81
21.61
5,337.88
5,252.01
2,458.23
735.18
5,973,008.568
643,309.265
0.17
-396.97
6,705.55
57.84
21.23
5,388.40
5,302.53
2,532.99
764.51
5,973,083.868
643,337.165
0.34
-415.95
6,800.35
58.02
21.27
5,438.73
5,352.86
2,607.86
793.62
5,973,159.273
643,364.850
0.19
-434.70
6,895.33
58.02
20.85
5,489.04
5,403.17
2,683.04
822.57
5,973,234.988
643,392.365
0.38
-453.25
6,990.61
58.09
20.57
5,539.45
5,453.58
2,758.67
851.16
5,973,311.138
643,419.511
0.26
471.38
7,084.76
58.02
20.00
5,589.27
5,503.40
2,833.61
878.86
5,973,386.581
643,445.778
0.52
-488.72
7,178.86
58.00
19.61
5,639.12
5,553.25
2,908.70
905.90
5,973,462.165
643,471.385
0.35
-505.39
7,273.57
58.06
19.90
5,689.27
5,603.40
2,984.31
933.06
5,973,538.277
643,497.097
0.27
-522.lr
7,368.22
58.04
20.26
5,739.35
5,653.48
3,059.74
960.63
5,973,614.212
643,523.229
0.32
-539.25
7,462.90
57.95
20.89
5,789.53
5,703.66
3,134.91
988.85
5,973,689.895
643,550.009
0.57
-557.07
7,558.10
54.24
20.38
5,842.63
5,756.76
3,208.84
1,016.70
5,973,764.333
643,576.444
3.92
-574.70
7,652.77
50.19
19.58
5,900.62
5,814.75
3,279.13
1,042.27
5,973,835.097
643,600.674
4.33
-590.56
7,747.58
46.65
19.36
5,963.53
5,877.66
3,345.98
1,065.91
5,973,902.382
643,623.036
3.74
-604.96
7,841.74
42.85
18.06
6,030.39
5,944.52
3,408.75
1,087.19
5,973,965.535
643,643.121
4.15
-617.59
7,936.32
39.34
17.43
6,101.66
6,015.79
3,467.95
1,106.15
5,974,025.077
643,660.947
3.74
-628.39
8,031.73
35.52
16.19
6,177.41
6,091.54
3,523.44
1,122.94
5,974,080.873
643,676.681
4.08
-637.54
8,126.03
31.74
15.56
6,255.91
6,170.04
3,573.66
1,137.24
5,974,131.352
643,690.019
4.03
-644.94
8,221.25
28.17
15.35
6,338.40
6,252.53
3,619.47
1,149.91
5,974,177.398
643,701.818
3.75
-651.32
7/112017 10.26:45AM
Page 6
COMPASS 5000.1 Build SID
2�~�Z (,
Z. _2 by
�►N`
BP
Final Survey Report
ER
1 UGHES
GE wmpaM
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well J-28
Project: Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Site: PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well: J-28
North Reference:
True
Wellbore: J -28A
Survey Calculation Method:
Minimum Curvature
Design: J -28A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi(azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
8,315.86
24.05
15.74
6,423.34
6,337.47
3,659.58
1,161.06
5,974,217.708
643,712.199
4.36
-656.9'
8,411.18
19.76
15.68
6,511.76
6,425.89
3,693.81
1,170.68
5,974,252.106
643,721.174
4.50
-661.88
8,505.50
15.37
16.01
6,6D1.66
6,515.79
3,721.19
1,178.44
5,974,279.626
643,728.412
4.66
-665.87
8,599.19
11.61
15.27
6,692.74
6,606.87
3,742.22
1,184.35
5,974,300.770
643,733.920
4.02
-668.89
8,693.63
8.58
10.08
6,785.71
6,699.84
3,758.33
1,188.09
5,974,316.944
643,737.349
3.35
-670.42
8,789.04
4.99
357.46
6,880.45
6,794.58
3,769.49
1,189.15
5,974,328.118
643,738.199
4.05
-669.97
8,882.69
3.52
308.60
6,973.86
6,887.99
3,775.35
1,186.72
5,974,333.935
643,735.660
4.02
-666.77
8,977.77
3.65
253.20
7,068.78
6,982.91
3,776.30
1,181.54
5,974,334.783
643,730.464
3.51
-661.51
9,073.37
4.61
241.15
7,164.14
7,078.27
3,773.56
1,175.27
5,974,331.931
643,724.239
1.35
-655.66
9,167.99
6.26
240.14
7,258.33
7,172.46
3,769.16
1,167.46
5,974,327.380
643,716.520
1.75
-648.52
9,262.81
8.43
240.00
7,352.36
7,266.49
3,763.11
1,156.96
5,974,321.132
643,706.134
2.29
-638.93
9,357.28
10.16
239.08
7,445.59
7,359.72
3,755.37
1,143.81
5,974,313.140
643,693.138
1.84
-626.95
9,451.97
12.21
239.36
7,538.48
7,452.61
3,745.97
1,128.03
5,974,303.447
643,677.539
2.17
-612.58
9,546.84
14.34
239.92
7,630.81
7,544.94
3,734.97
1,109.23
5,974,292.090
643,658.953
2.25
-595.43
9,641.31
16.67
238.45
7,721.83
7,635.96
3,722.01
1,087.56
5,974,278.726
643,837.532
2.50
-575.71
9,735.74
18.51
236.75
7,811.84
7,725.97
3,706.71
1,063.48
5,974,262.966
643,613.749
2.02
-553.91
9,830.25
20.22
236.69
7,901.00
7,815.13
3,689.51
1,037.28
5,974,245.276
643,587.885
1.81
-530.27
9,924.12
22.12
237.63
7,988.53
7,902.66
3,671.14
1,008.79
5,974,226.367
643,559.755
2.06
-504.52
10,019.80
24.08
238.82
8,076.54
7,990.67
3,651.39
976.88
5,974,206.013
643,528.221
2.11
-475.56
10,114.46
26.08
238.92
8,162.27
8,076.40
3,630.64
942.53
5,974,184.624
643,494.279
2.11
-444.32
10,209.75
28.04
239.07
8,247.12
8,161.25
3,608.32
905.37
5,974,161.596
643,457.558
2.06
-410.52
10,303.83
29.41
238.64
8,329.63
8,243.76
3,584.93
866.68
5,974,137.479
643,419.317
1.47
-375.33
10,398.92
31.39
239.59
8,411.64
8,325.77
3,560.24
825.38
5,974,112.012
643,378.499
2.14
-337.74
10,493.16
33.31
239.64
8,491.25
8,405.38
3,534.74
781.88
5,974,085.687
643,335.496
2.04
-298.08
10,588.25
35.79
240.25
8,569.56
8,483.69
3,507.74
735.20
5,974,057.808
643,289.344
2.63
-255.47
10,630.03
36.87
239.91
8,603.22
8,517.35
3,495.39
713.75
5,974,045.057
643,268.132
2.63
-235.88
7/11/201710:2645AM Page 7 COMPASS 5000 1 Build 81D
h BP BA ER
b
1000
`j Final Survey Report F�UGHES
Company:
North America -ALASKA -BP
Local Coordinate Reference:
Well J-28
Project:
Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Site:
PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well:
J-28
North Reference:
True
Wellbore:
J -28A
Survey Calculation Method:
Minimum Curvature
Design:
J -28A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
ND
NDSS
N/S
EIW
Northing
Easfing
DLeg
V. Sec
(usft)
(°)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
10.669.00
38.09
240.00
8,634.14
8,548.27
3,483.52
693.23
5,974,032.798
643,247.838
3.12
-217.14
7..
10,683.54
38.54
240.03
8,645.55
8,559.68
3,479.01
685.42
5,974,028.146
643,240.118
3.12
-210.01
10,716.37
41.28
237.19
8,670.74
8,584.87
3,468.03
667.45
5,974,016.827
643,222.364
10.02
-193.69'
10,747.40
45.00
236.37
8,693.37
8,607.50
3,456.41
649.71
5,974,004.866
643,204.846
12.12
-177.67
10,777.75
47.88
238.09
8,714.29
8,628.42
3,444.51
631.22
5,973,992.623
643,186.583
10.34
-160.95
10,810.65
51.20
237.26
8,735.63
8,649.76
3,431.13
610.07
5,973,978.837
643,165.695
10.27
-141.80
10,842.08
54.58
237.57
8,754.59
8,668.72
3,417.63
588.95
5,973,964.944
643,144.840
10.78
-122.70
10,872.98
56.70
239.10
8,772.03
8,686.16
3,404.24
567.24
5,973,951.149
643,123.389
7.99
-102.99
10,907.12
60.02
239.58
8,789.94
8,704.07
3,389.43
542.24
5,973,935.860
643,098.677
9.80
-80.22
10,937.21
63.83
240.97
8,804.10
8,718.23
3,376.27
519.19
5,973,922.269
643,075.880
13.30
-59.15
10,967.31
67.41
240.47
8,816.52
8,730.65
3,362.86
495.28
5,973,908.410
643,052.232
11.99
-37.27
10,998.96
70.88
241.56
8,827.79
8,741.92
3,348.54
469.41
5,973,893.595
643,026.642
11.43
-13.57
11,031.66
74.06
242.94
8,837.64
8,751.77
3,334.02
441.82
5,973,878.561
642,999.333
10.52
11.81
11,062.24
77.85
241.33
8,845.06
8,759.19
3,320.16
415.60
5,973,864.201
642,973.384
13.40
35.92
11,094.24
81.36
240.11
8,850.83
8,764.96
3,304.76
388.15
5,973,848.291
642,946.236
11.59
61.05
11,125.61
85.30
239.11
8,854.47
8,768.60
3,289.00
361.28
5,973,832.024
642,919.672
12.95
85.5.`
11,158.34
88.95
238.93
8,856.11
8,770.24
3,272.18
333.26
5,973,814.673
642,891.978
11.17
111.04
11,188.84
91.75
238.30
8,855.93
8,770.06
3,256.30
307.22
5,973,798.300
642,866.253
9.41
134.70
11,220.16
95.24
236.33
8,854.02
8,768.15
3,239.42
280.92
5,973,780.926
642,840.274
12.79
158.49
11,250.84
98.35
237.19
8,850.39
8,764.52
3,222.72
255.44
5,973,763.749
642,815.121
10.51
181.48
11,283.21
99.60
240.73
8,845.34
8,759.47
3,206.24
228.05
5,973,746.748
642,788.052
11.47
206.40
TIP to J-28APB1
11,302.76
101.38
242.63
8,841.78
8,755.91
3,197.12
211.13
5,973,737.309
642,771.310
13.20
221.93
11,334.38
102.18
243.24
8,835.32
8,749.45
3,183.04
183.57
5,973,722.704
642,744.021
3.16
247.34
11,366.23
103.47
242.76
8,828.25
8,742.38
3,168.94
155.90
5,973,708.084
642,716.626
4.31
272.86
11,395.00
104.89
242.65
8,821.21
8,735.34
3,156.15
131.11
5,973,694.825
642,692.088
4.95
295.70
7/11/2017 10:26ASAM Page 8 COMPASS 5000 1 Build 81D
f
2f ZBP
by
Final Survey Report
B ER
FUGHES
�.fffr
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project:
Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Site:
PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well:
J-28
North Reference:
True
Wellbore:
J -28A
Survey Calculation Method:
Minimum Curvature
Design:
J -28A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Seo
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
('HOOusft)
(usft)
11,430.51
106.17
242.37
8,811.70
8,725.83
3,140,35
100.76
5,973,678.460
642,662.046
3.68
323.61
11,460.86
107.55
242.27
8,802.90
8,717.03
3,126.86
75.04
5,973,664.483
642,636.588
4.56
347.31
11,489.39
109.36
241.95
8,793.87
8,708.00
3,114.20
51.12
5,973,651.373
642,612.917
6.43
369.30
11,523.58
111.32
241.93
8,781.98
8,696.11
3,099.12
22.83
5,973,635.760
642,584.922
5.73
395.30
11,554.77
111.27
241.53
8,770.65
8,684.78
3,085.36
-2.76
5,973,621.513
642,559.596
1.21
418.80
11,583.60
111.08
241.39
8,760.24
8,674.37
3,072.52
-26.38
5,973,608.224
642,536.229
0.80
440.47
11,679.49
107.45
240.75
8,728.61
8,642.74
3,028.73
-105.59
5,973,562.944
642,457.874
3.84
513.05
11,712.23
105.48
239.93
8,719.33
8,633.46
3,013.19
-132.87
5,973,546.892
642.430.895
6.48
537.99
11,743.20
104.47
239.51
8,711.33
8,625.46
2,998.11
-158.70
5,973,531.319
642,405.352
3.51
561.55
11,773.32
103.33
239.31
8,704.09
8,618.22
2,983.23
-183.87
5,973,515.966
642,380.473
3.84
584.48
11,806.49
100.82
237.63
8,697.15
8,611.28
2,966.27
-211.51
5,973,498.483
642,353.160
9.04
609.59
11,837.49
98.46
236.74
8,691.96
8,606.09
2,949.70
-237.20
5,973,481.437
642,327.798
8.12
632.80
11,868.08
97.16
234.60
8,687.80
8,601.93
2,932.61
-262.22
5,973,463.875
642,303.105
8.13
655.29
11,900.99
97.03
233.10
8,683.74
8,597.87
2,913.35
-288.59
5,973,444.114
642,277.108
4.54
678.82
11,933.56
97.00
232.10
8,679.76
8,593.89
2,893.72
-314.27
5,973,423.997
642,251.808
3.05
701.62
11,963.19
96.18
231.24
8,676.36
8,590.49
2,875.46
-337.36
5,973,405.308
642,229.072
4.00
722.04
11,997.08
95.16
231.21
8,673.01
8,587.14
2,854.34
-363.65
5,973,383.694
642,203.189
3.01
745.24
12,026.91
93.98
231.19
8,670.64
8,584.77
2,835.71
-386.83
5,973,364.627
642,180.375
3.96
765.69
12,057.77
92.97
230.58
8,668.76
8,582.89
2,816.28
-410.72
5,973,344.745
642,156.852
3.82
786.75
12,090.41
93.15
229.94
8,667.02
8,581.15
2,795.44
-435.79
5,973,323.436
642,132.192
2.03
808.77
12,121.95
92.65
229.86
8,665.43
8,579.56
2,775.15
-459.88
5,973,302.694
642,108.489
1.61
829.91
12,151.01
92.13
229.44
8,664.21
8,578.34
2,756.35
-482.01
5,973,283.480
642,086.724
2.30
849.30
12,246.20
90.10
227.66
8,662.36
8,576.49
2,693.36
-553.34
5,973,219.145
642,016.613
2.84
911.48
12,340.31
90.11
226.87
8,662.19
8,576.32
2,629.49
-622.46
5,973,153.985
641,948.721
0.84
971.36
12,434.47
90.23
226.74
8,661.91
8,576.04
2,565.04
-691.11
5,973,088.246
641,881.319
0.19
1,030.69
12,527.89
90.20
226.71
8,661.56
8,575.69
2,501.00
-759.12
5,973,022.930
641,814.537
0.05
1,089.45
12,622.43
90.23
226.52
8,661.21
8,575.34
2,436.06
-827.83
5,972,956.702
641,747.083
0.20
1,148.77
7/11/2017 10.26:45AM Page 9 COMPASS 5000.1 Build 81D
. h
�.l p
a
BP
Final Survey Report
�F�UGHES
Company:
Project:
Site:
North America - ALASKA - BP
Prudhoe Bay
PB J Pad
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
Well J-28
J-28AActual @ 85.87usft (Parker 272 Actual)
J-28AActual @ 85.87usft (Parker 272 Actual)
Well:
J-28
North Reference:
True
Wellbore:
Design:
J -28A
J -28A
Survey Calculation Method:
Database:
Minimum Curvature
EDM R5K-Alaska PROD -ANCP1
Survey
MD
Inc
Aid (azimuth)
TVD
TVDSS
NIS
E1W
Northing
Easting
DLeg
V. Sac
(weft)
(•)
(•)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(•HOOusft)
(usft)
12,717.63
89.25
226.47
8,661.64
8,575.77
2,370.53
-896.88
5,972,889.871
641,679.298
1.03
1,208.35
12,811.93
85.78
226.63
8,665.73
8,579.86
2,305.75
-965.26
5,972,823.807
641,612.162
3.68
1,267.3f
12,846.48
84.30
226.72
8,668.71
8,582.84
2,282.13
-990.30
5,972,799.720
641,587.578
4.29
1,289.00
12,879.20
85.47
226.10
8,671.63
8,585.76
2,259.66
-1,013.90
5,972,776.807
641,564.407
4.04
1,309.36
12,906.96
86.15
225.88
8,673.66
8,587.79
2,240.43
-1,033.82
5,972,757.198
641,544.866
2.57
1,326.50
13,000.87
86.08
224.55
8,680.02
8,594.15
2,174.42
-1,100.31
5,972,689.950
641,479.639
1.41
1,383.49
13,034.35
87.35
222.99
8,681.94
8,596.07
2,150.29
-1,123.44
5,972,665.381
641,456.983
6.00
1,403.14
13,066.04
87.53
221.36
8,683.35
8,597.48
2,126.83
-1,144.69
5,972,641.522
641,436.180
5.17
1,421.04
13,096.48
87.47
219.31
8,684.68
8,598.81
2,103.65
-1,164.37
5,972,617.974
641,416.943
6.73
1,437.42
13,128.86
89.34
218.44
8,685.58
8,599.71
2,078.45
-1,184.69
5,972,592.397
641,397.114
6.37
1,454.15
13,160.58
90.23
216.49
8,685.70
8,599.83
2,053.27
-1,203.98
5,972,566.861
641,378.304
6.76
1,469.87
13,190.80
90.23
215.88
8,685.58
8,599.71
2,028.88
-1,221.82
5,972,542.137
641,360.931
2.02 -
1,484.26
13,285.38
90.26
215.40
8,685.18
8,599.31
1,952.02
-1,276.93
5,972,464.246
641,307.296
0.51
1,528.50
13,319.04
90.63
215.26
8,684.92
8,599.05
1,924.56
-1,296.40
5,972,436.423
641,288.358
1.18
1,544.08
13,348.97
91.52
215.60
8,694.35
8,598.48
1,900.18
-1,313.74
5,972,411.717
641,271.479
3.18
1,557.98
13,380.28
93.06
215.05
8,683.10
8,597.23
1,874.65
-1,331.83
5,972,385.855
641,253.880
5.22
1,572.47
13,412.70
95.06
215.37
8,680.81
8,594.94
1,848.23
-1,350.48
5,972,359.087
641,235.742
6.25
1,587.3f
13,444.36
95.06
215.61
8,678.02
8,592.15
1,822.55
-1,368.79
5,972,333.068
641,217.926
0.76
1,602.06
13,474.62
95.09
215.52
8,675.34
8,589.47
1,798.04
-1,386.32
5,972,308.222
641,200.865
0.31
1,616.12
13,538.68
95.15
216.52
8,669.62
8,583.75
1,746.43
-1,423.84
5,972,255.917
641,164.335
1.56
1,646.34
13,569.17
94.71
217.28
8,667.00
8,581.13
1,722.14
-1,442.08
5,972,231.285
641,146.563
2.87
1,661.14
13,601.84
93.97
218.31
8,664.53
8,578.66
1,696.40
-1,462.04
5,972,205.171
641,127.093
3.87
1,677.45
13,633.57
93.33
219.31
8,662.51
8,576.64
1,671.72
-1,481.89
5,972,180.126
641,107.722
3.74
1,693.78
13,663.51
93.15
220.40
8,660.82
8,574.95
1,648.78
-1,501.04
5,972,156.821
641,089.007
3.68
1,709.67
13,699.56
93.15
221.10
8,658.84
8,572.97
1,621.51
-1,524.54
5,972,129.112
641,066.035
1.94
1,729.27
13,728.38
92.56
222.50
8,657.40
8,571.53
1,600.05
-1,543.72
5,972,107.296
641,047.262
5.27
1,745.39
13,758.25
92.19
223.16
8,656.16
8,570.29
1,578.16
-1,564.01
5,972,085.029
641,027.395
2.53
1,762.54
7/112017 10:26:45AM Page 10 COMPASS 5000.1 Build 81D
r
Survey
BP
0
by
Final Survey Report
BAER
FUGHES
►N
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well J-28
Project: Prudhoe Bay
ND Reference:
J-28AActual @ 85.87usR (Parker 272 Actual)
Site: PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well: J-28
North Reference:
True
Wellbore: J -28A
Survey Calculation Method:
Minimum Curvature
Design: J -28A
Database:
EDM R5K-Alaska PROD -ANCP1
Survey
Mo
Inc
AN (azimuth)
TD
TOSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
(usft)
V)
(°)
(usft)
(usft)
lusty
(usft)
(usft)
(usft)
(°I100usft)
(usft) -
13,791.76
91.60
224.13
8,655.05
8,569.18
1,553.93
-1,587.13
5,972,060.361
641,004.746
3.39
1,782.11,
13,823.38
90.14
225.67
8,654.57
8,568.70
1,531.53
-1,609.44
5,972,037.548
640,982.862
6.71
1,801.27
13,852.00
89.20
227.53
8,654.74
8,568.87
1,511.87
-1,630.24
5,972,017.495
640,962.448
7.28
1,819.22
13,886.37
89.25
229.34
8,655.20
8,569.33
1,489.07
-1,655.95
5,971,994.212
640,937.175
5.27
1,841.63
13,918.26
89.13
230.42
8,655.66
8,569.79
1.468.52
-1,680.33
5,971,973.207
640,913.189
3.41
1,863.02
13,946.67
89.16
232.03
8,656.08
8,570.21
1,450.73
-1,702.48
5,971,955.001
640,891.387
5.67
1,882.56
13,981.45
90.32
233.80
8,656.24
8,570.37
1,429.76
-1,730.22
5,971,933.508
640,864.049
6.08
1,907.22
14,012.78
90.26
235.62
8,656.08
8,570.21
1,411.66
-1,755.79
5,971,914.928
640,838.828
5.81
1,930.12
14,041.12
90.26
237.53
8,655.95
8,570.08
1,396.05
-1,779.44
5,971,898.872
640,815.480
6.74
1,951.45
14,075.76
91.61
239.76
8,655.38
8,569.51
1,378.03
-1,809.02
5,971,880.294
640,786.255
7.52
1,978.32
14,107.77
93.18
241.94
8,654.05
8,568.18
1,362.46
-1,836.95
5,971,864.190
640,758.630
8.39
2,003.90
14,135.72
94.20
242.84
8,652.25
8,566.38
1,349.53
-1,861.66
5,971,850.797
640,734.167
4.86
2,026.64
14,169.53
94.16
244.27
8,649.78
8,563.91
1,334.51
-1,891.85
5,971,835.211
640,704.269
4.22
2,054.53
14,201.55
94.19
245.09
8,647.45
8,561.58
1,320.86
-1,920.72
5,971,821.008
640,675.669
2.56
2,D81.29
14,230.73
93.79
245.33
8,645.42
8,559.55
1,308.65
-1,947.15
5,971,808.303
640,649.481
1.60
2,105.83._
14,264.47
92.95
246.25
8,643.44
8,557.57
1,294.84
-1,977.87
5,971,793.911
640,619.033
3.69
2,134.45
14,295.28
92.23
247.70
8,642.05
8,556.18
1,282.80
-2,006.19
5,971,781.338
640,590.943
5.25
2,160.85
14,325.48
92.07
248.95
8,640.91
8,555.04
1,271.65
-2,034.24
5,971,769.662
640,563.118
4.17
2,187.14
14,358.35
92.07
249.49
8,639.73
8,553.86
1,260.00
-2,064.95
5,971,757.427
640,532.636
1.64
2,216.00
14,419.95
92.07
251.09
8,637.50
8,551.63
1,239.24
-2,122.90
5,971,735.570
640,475.094
2.60
2,270.62
14,514.22
90.99
255.24
8,634.98
8,549.11
1,211.95
-2,213.08
5,971,706.578
640,385.459
4.55
2,356.29
14,546.76
90.06
256.98
8,634.68
8,548.81
1,204.14
-2,244.66
5,971,698.169
640,354.030
6.06
2,386.54
14,578.37
90.11
258.43
8,634.64
8,548.77
1,197.41
-2,275.54
5,971,690.852
640,323.282
4.59
2,416.23
14,608.10
90.08
259.42
8,634.59
8,548.72
1,191.70
-2,304.72
5,971,684.588
640,294.222
3.33
2,444.37
14,641.35
90.08
260.19
8,634.54
8,548.67
1,185.82
-2,337.45
5,971,678.083
640,261.618
2.32
2,476.00
14,673.15
90.08
261.78
8,634.50
8,548.63
1,180.83
-2,368.85
5,971,672.504
640,230.314
5.00
2,506.45
14,703.75
90.14
263.43
8,634.44
8,548.57
1,176.90
-2,399.20
5,971,667.990
640,200.053
5.40
2,535.99
7/11/2017 10,26:45AM Page 11 COMPASS 5000.1 Build BID
t S by
e
BP
Final Survey Report
�F�UGHES
Company: North America - ALASKA - BP
Project: Prudhoe Bay
Site: PB J Pad
Local Coordinate Reference:
TVD Reference:
MD Reference:
Well J-28
J-28AActual @ 85.87usft (Parker 272 Actual)
J-28AActual @ 85.87usft (Parker 272 Actual)
Well: J-28
North Reference:
True
Wellbore: J -28A
Design: J -28A
Survey Calculation Method:
Database:
Minimum Curvature
EDM RSK- Alaska PROD -ANCP7
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
WS
ENV
Northing
Easting
DLeg
V. Sec
(usft) (')
(')
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
('NOOusft)
(usft)
14,736.30
90.08
264.76
6,634.38
8,548.51
1,173.55
-2,431.57
5,971,664.D27
640,167.748
4.09
2,567.62
14,766.95
90.08
266.50
8,634.33
8,548.46
1,171.21
-2,462.13
5,971,661.112
640,137.241
5.68
2,597.51'
14,797.78
90.08
266.75
8,634.29
8,548.42
1,169.40
-2,492.91
5,971,658.712
640,106.507
0.81
2,627.83
14,892.14
91.15
267.03
8,633.28
8,547.41
1,164.28
-2,587.12
5,971,651.804
640,012.414
1.17
2,720.50
14,986.04
91.15
267.36
8,631.39
8,545.52
1,159.68
-2,680.89
5,971,645.428
639,918.757
0.35
2,812.79
15,080.22
92.29
267.73
8,628.57
8,542.70
1,155.65
-2,774.94
5,971,639.609
639,824.808
1.27
2,905.43
15,174.09
92.23
267.75
8,624.86
8,538.99
1,151.95
-2,868.66
5,971,634.130
639,731.179
0.07
2,997.80
15,268.95
92.20
267.07
8,621.20
8,535.33
1,147.67
-2,963.36
5,971,628.048
639,636.593
0.72
3,091.05
15,305.05
92.29
265.40
8,619.78
8,533.91
1,145.30
-2,999.35
5,971,624.996
639,600.654
4.63
3,126.40
15,334.83
92.23
264.03
8,618.61
8,532.74
1,142.56
-3,028.98
5,971,621.693
639,571.084
4.60
3,155.39
15,363.76
92.26
262.57
8,617.48
8,531.61
1,139.19
-3,057.69
5,971,617.775
639,542.446
5.04
3,183.38
15,397.16
92,29
260.91
8,616.15
8,530.28
1,134.39
-3,090.72
5,971,612.354
639,509.519
4.97
3,215.46
15,428.32
92.29
259.62
8,614.90
8,529.03
1,129.13
-3,121.40
5,971,606.508
639,478.941
4.14
3,245.15
15,457.59
92.26
258.98
8,613.74
8,527.87
1,123.70
-3,150.14
5,971,600.533
639,450.314
2.19
3,272.90
15,490.92
92.26
257.83
8,612.43
8,526.56
1,117.00
-3,182.76
5,971,593.221
639,417.825
3.45
3,304.32
15,552.86
92.01
255.81
8,61D.12
8,524.25
1,102.89
-3,243.03
5,971,577.966
639,357.846
3.28
3,362.13
15,586.11
91.17
254.35
8,609.20
8,523.33
1,094.33
-3,275.14
5,971,568.801
639,325.901
5.06
3,392.8r
15,617.15
90.81
253.15
8,608.66
8,522.79
1,085.65
-3,304.94
5,971,559.552
639,296.279
4.04
3,421.15
15,647.03
90.31
253.17
8,608.37
8,522.50
1,076.99
-3,333.53
5,971,550.355
639,267.854
1.67
3,448.32
15,706.98
90.08
252.43
8,608.17
8,522.30
1,059.27
-3,390.80
5,971,531.544
639,210.937
1.29
3,502.67
15,750.00
90.08
252.43
8,608.11
8,522.24
1,046.28
-3,431.82
5,971,517.781
639,170.182
0.00
3,541.56
Projection to TD .4 1/2"
71111201710.26,45AM Page 12 COMPASS 5000.1 Build 810
:rZBP BAER
Z0•N`r by Final Survey Report F�UGHEs
Company:
Project:
Site:
Well:
Wellbore:
Design:
Casing Points
North America - ALASKA- BP
Prudhoe Bay
PB J Pad
J-28
J -28A
J -28A
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well J-28
J-28AActual @ 85.87usft (Parker 272 Actual)
J-28AActual Q 85.87usft (Parker 272 Actual)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCPi
7/112017 10'26:45AM Page 13 COMPASS 5000.1 Build 810
Measured
Vertical
Casing
Hole
Depth
Depth
Diameter
Diameter -
(usft)
(usft)
Name
(in)
(in)
15,750.00
8,608.11
41/2'
4.500
6.125
Design Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+Nl-S
+El -W
lush)
(usft)
(usft)
(usft) Comment
11,283.21
8,845.34
3,206.24
228.05 TIP to J-28AP81
15,750.00
8,608.11
1,046.28
-3,431.82 Projection to TD
Prepared By: Yosha Raghirsingh Survey Manager Baker Hughes a GE Company
7/112017 10'26:45AM Page 13 COMPASS 5000.1 Build 810
RECEIVED
BA ER SEP 0 7 2017
F�UGHES PRINT DISTRIBUTION LIST
aGEcompany AOGCC
COMPANY BP Exploration Alaska Inc.
WELL NAME 3-28APB1
FIELD Prudhoe Bay Unit
COUNTY PRUDHOE BAY
BHI DISTRICT Alaska
21 7075
ase sign and return one copy of this transmittal form to:
Exploration (Alaska) Inc.
:rotechnical Data Center, LR2-1 DATA LOGGED
9 /:x/2071
) E. Benson Blvd. ivl_ K. BENDER
:horage, Alaska 99508 orAKGDMINTERNAL@bp.com
LOG TYPE GR-RES-DEN-NEU
STK:Image Log
LOG DATE July 3, 2017
AUTHORIZED BY Paul Caninres
EMAIL Paul.Canizaresanbhge.com TODAYS DATE August 25, 2017
Revision
STATUS Final Replacement: No Details:
Rev. Requested by:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
lu
I :BP north Slope.
:EOA, PBOC. PRB-20 (Office 109)
D&C Wells Project Aides
iAnn: Benda Glassmaker & Peggy O'Neil
:900 E. Benson Blvd.
Anchorage, Alaska 99508
:ConocoPhiilips Alaska Inc.
Attn: Ricky Elgarico
C Street
99510
FIELD /
FINALCD/DVD
FINAL
PRELIM
LOGS
I
(las, dlis, PDF, META,
SURVEY REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRIN
OF PRIN
# OF COPIES
—31
I# OF COPIES J# OF COPIES
3 ExxonMobil, Alaska 0 0 i 1 0
:Attn. Lynda M. Yaskell and/or Lisa Boggs
3201 C Street, Suite 505
:,Anchorage, AK 99503
e of Alaska -AOGCC
x Makana Bender
W. 7th Ave, Suite 100
horage, Alaska 99501
5;DNR-Division of0d&Gas *** 0 1 0 1 1 1 1 1 U 1
IAtm: Garret Brown
1550 West 7th Avenue, Suite 1100
!Anchorage, Alaska 99501
** Stamp "confidential" on as material deliver to DNR
6!BP Exploration (Alaska) Inc.
Pet ntechnical Data Center, LR2-1
'900 E. Benson Blvd.
:Anchorage, Alaska 99508
Attn: Gerardo Cedillo
TOTALS FOR THIS PAGE: 0 2 5 4 0
_,.., b
1,,,,,i p
RECEIVE®
SEP 0 7 2017
AOGCC
North America - ALASKA - BP
Prudhoe Bay
PB J Pad
J-28
J-28APB1
500292172171
Design: J-28APB1
Final Survey Report
10 July, 2017
BA ER
F IGHES
BAT
GE company
21 7075
28565
•�BID
J-28, J-28
Audit Notes:
BA ER
4 j by
Phase:
Final Survey Report
FUGHES
+NIS 0.00
usft
Northing:
5,970,537.000 usft
Na
70° 19' 37.316 N
+EI -W 0.00
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well J-28
Project:
Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Site:
PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well:
J-28
North Reference:
True
Wellbore:
J-2BAP81
Survey Calculation Method:
Minimum Curvature
Design:
J-28APB1
Database:
EDM RSK- Alaska PROD -ANCP1
Protect
Prudhoe Bay, GPB, PRUDHOE BAY
Map System:
Alaska NAD27 State Plane Zones
System Datum:
Mean Sea Level
Geo Datum:
NAD27' OGP-Usa AK [4267`15864]
Using Well Reference Point
Map Zone:
NAD27' OGP-Usa AK /Alaska zone 4 [26734'1586,
Using geodetic scale factor
Site
PS J Pad, TR -11-13
Site Position:
Northing: 5,968,224.220 usft Latitude:
70' 19' 14.845 N
From:
Map
Easting: 641,155.790 usft Longitude;
148' 51'20.092 W
Position Uncertaintv: 0.00 usft
Slot Radius: 0.000 in Grid Convergence: 1.08 °
If
J-28, J-28
Audit Notes:
Version:
Phase:
Vertical Section:
II Position
+NIS 0.00
usft
Northing:
5,970,537.000 usft
Latitude:
70° 19' 37.316 N
+EI -W 0.00
usft
Easting:
642,621.000 usft
Longitude:
148° 50' 36.055 W
iftion Uncertainty
0.00
usft
Wellhead Elevation:
39.52 usft
Ground Level:
39.07 usft
Wellbore - J-28APB1
Magnetics Model Name Sample Date
BGGM2016 7/1/2017
Design
J-28APBI
Audit Notes:
Version:
Phase:
Vertical Section:
Depth From (TVD)
(usft)
46.35
Declination
1%
17.78
Dip Angle
l°l
e1.o1
ACTUAL Tie On Depth:
+N/ -S +E/ -W
(usft) (usft)
0.00 0.00
Field Strength
(nT)
57,551
2, 908.76
Direction
C)
276.27
7/10/2017 4:36:16PM Page 2 COMPASS 5000.1 Build 81D
Se :BP
by
Date 7/10/2017
BA ER a w
Azl (azimuth)
Final Survey Report
F�y tlES
NIS
E/W
(usft)
Company: North America -ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project: Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Site: PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well: J-28
North Reference:
True
Wellbore: J-28APB1
Survey Calculation Method:
Minimum Curvature
Design: J-28APB1
Database:
EDM R5K-Alaska PROD -ANCP7
Survey Program
Date 7/10/2017
Inc
Azl (azimuth)
From
To
NIS
E/W
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
108.76
2,908.76 J-28 Srvy 1 BOSS -MS (J-28PB1)
BOSS -GYRO
Sperry -Sun BOSS gyro multishot
2,953.00
3,706.00 Gyrodata SS 8-1/2" (J-28APB1)
GYD-GC-SS
Gyrodata gyro single shots
3,801.81
10,630.03 BHI ATK MWD 8-1/2'X9-7/8"(J-28APB1)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
10,683.54
11,440.25 BHI OTK MWD 6-1/8"(J-28APB7)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
11,523.02
13,569.08 BHI ATK MWD 6-1/8"(J-28APB1)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
Survey
MD
Inc
Azl (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sac
(usft)
(1
0
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
46.35
0.00
0.00
46.35
-39.52
0.00
0.00
5,970,537.000
642,621.000
0.00
0.00
108.76
0.18
129.40
108.76
22.89
-0.06
0.08
5,970,536.939
642,621.077
0.29
-0.08
208.76
0.13
87.19
208.76
122.89
-0.16
0.31
5,970,536.850
642,621.313
0.12
-0.33
308.76
0.18
125.70
308.76
222.89
-0.24
0.55
5,970,536.768
642,621.556
0.11
-0.57
408.76
0.10
62.80
408.76
322.89
-0.29
0.76
5,970,536.720
642,621.762
0.16
-0.78
5D8.76
0.13
94.61
508.76
422.89
-0.26
0.95
5,970,536.755
642,621.952
0.07
-0.97
608.76
0.12
156.50
608.76
522.89
-0.37
1.10
5,970,536.652
642,622.109
0.13
-1.14
708.76
0.08
86.60
708.76
622.89
-0.46
1.21
5,970,536.563
642,622.222
0.12
-1.2
808.76
0.10
72.80
808.76
722.89
-0.43
1.37
5,970,536.596
642,622.374
0.03
-1.41
9D8.76
0.10
119.31
908.76
822.89
-0.45
1.53
5,970,536.582
642,622.534
0.08
-1.57
1,008.76
0.00
0.00
1,008.76
922.89
-0.49
1.60
5,970,536.540
642,622.611
0.10
-1.65
1,108.76
0.25
352.61
1,108.76
1,022.89
-0.27
1.57
5,970,536.756
642,622.579
0.25
-1.59
1,208.76
0.05
356.50
1,208.76
1,122.89
-0.01
1.54
5,970,537.015
642,622.543
0.20
-1.54
1,308.76
0.10
12.89
1,308.76
1,222.89
0.11
1.56
5,970,537.144
642,622.558
0.05
-1.54
1,408.76
0.02
177.11
1,408.76
1,322.89
0.18
1.58
5,970,537.212
642,622.577
0.12
-1.55
1,508.76
0.15
287.70
1,508.76
1,422.89
0.20
1.46
5,970,537.232
642,622.452
0.16
-1.43
1,608.76
0.18
258.30
1,608.76
1,522.89
0.21
1.18
5,970,537.235
642,622.174
0.09
-1.15
1,708.76
0.10
292.00
1,708.76
1,622.89
0.21
0.94
5,970,537.231
642,621.939
0.11
-0.91
1,808.76
0.22
262.30
1,808.76
1,722.89
0.22
0.67
5,970,537.233
642,621.668
0.14
-0.64
711012017 4: 36: 16PM Page 3 COMPASS 5000.1 Build BID
BP
Final Survey Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
BAER
S
lgtm ny
Well J-28
J-28AActual @ 85.87usft (Parker 272 Actual)
J-28AActual @ 85.87usft (Parker 272 Actual)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Survey
by
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB J Pad
Well:
J-28
Wellbore:
J-28APB1
Design:
J-28APB1
BP
Final Survey Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
BAER
S
lgtm ny
Well J-28
J-28AActual @ 85.87usft (Parker 272 Actual)
J-28AActual @ 85.87usft (Parker 272 Actual)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
Azl (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
(usft)
(')
(')
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
('1100usft)
(usft)
1,908.76
0.22
318.11
1,908.76
1,822.89
0.34
0.35
5,970,537.344
642,621.347
0.21
-0.31
2,008.76
0.28
341.40
2,008.75
1,922.88
0.71
0.15
5,970,537.715
642,621.134
0.12
-0.0
2,108.76
0.33
346.00
2,108.75
2,022.88
1.22
0.00
5,970,538.223
642,620.977
0.06
0.13
2,208.76
0.12
355.40
2,208.75
2,122.88
1.61
-0.08
5,970,538.605
642,620.891
0.21
0.25
2,308.76
0.07
315.50
2,308.75
2,222.88
1.75
-0.13
5,970,538.752
642,620.837
0.08
0.32
2,408.76
0.10
25.30
2,408.75
2,322,88
1.88
-0.13
5,970,538.874
642,620.830
0.10
0.34
2,508.76
0.10
154.40
2,508.75
2,422.88
1.88
-0.06
5,970,538.876
642,620.905
0.18
0.26
2,608.76
0.18
102.40
2,608.75
2,522.88
1.77
0.13
5,970,538.767
642,621.098
0.14
0.06
2,676.76
0.09
32.99
2,676.75
2,590.88
1.79
0.26
5,970,538.792
642,621.231
0.25
-0.07
13 318"
2,708.76
0.13
355.40
2,708.75
2,622.88
1.84
0.28
5,970,538.849
642,621.241
0.25
-0.07
2,758.76
2.88
308.11
2,758.73
2,672.86
2.68
-0.72
5,970,539.662
642,620.232
5.59
1.01
2,808.76
4.02
303.40
2,808.64
2,722.77
4.42
-3.17
5,970,541.355
642,617.748
2.35
3.63
2,858.76
4.57
300.40
2,858.50
2,772.63
6.39
-6.35
5,970,543.267
642,614.530
1.19
7.01
2,908.76
5.07
298.70
2,908.32
2,822.45
8.46
-10.01
5,970,545.266
642,610.836
1.04
10.87
TIP
2,953.00
5.83
300.05
2,952.36
2,866.49
10.52
-13.67
5,970,547.260
642,607.138
1.74
14.7?
KOP-TOWS
2,954.21
5.82
301.58
2,953.56
2,867.69
10.59
-13.77
5,970,547.321
642,607.031
12.89
14.84
9518..
2,967.00
5.92
317.73
2,966.29
2,880.42
11.41
-14.77
5,970,548.129
642,606.020
12.89
15.93
2,999.00
7.15
322.01
2,998.08
2,912.21
14.20
-17.10
5,970,550.875
642,603.632
4.13
18.55
3,035.00
9.32
326.01
3,033.71
2,947.84
18.39
-20.11
5,970,555.000
642,600.544
6.23
22.00
3,065.00
11.12
329.72
3,063.23
2,977.36
22.90
-22.93
5,970,559.458
642,597.642
6.39
25.29
3,095.00
12.42
333.01
3,092.60
3,006.73
28.27
-25.85
5,970,564.774
642,594,617
4.88
28.79
3,126.00
13.16
335.35
3,122.83
3,036.96
34.45
-28.84
5,970,570.894
642,591.516
2.91
32.43
3,216.00
15.80
346.72
3,209.98
3,124.11
55.70
-35.93
5,970,591.998
642,584.024
4.30
41.79
7/1012017 4:36: 16PM Page 4 COMPASS 5000.1 Build 81D
by
BP
RA�GHES
%N` _S
Final Survey Report
Ncr�omr��v
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project:
Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
She:
PB J Pad
MD Reference:
J-28AActual aQ 85.87usft (Parker 272 Actual)
Well:
J-28
North Reference:
True
Wellbore:
J-28APB1
Survey Calculation Method:
Minimum Curvature
Design:
J-28APB1
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
AN (azimuth)
TVD
TVDSS
NIS
EIW
Nothing
Easting
DLeg
V. Sec
(waft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°11100usft)
(usft)
3,246.00
16.86
350.15
3,238.77
3,152.90
63.96
-37.61
5,970,600.226
642,582.184
4.78
44.3;
3,276.00
17.50
351.46
3,267.43
3,181.56
72.70
-39.02
5,970,608.944
642,580.604
2.49
46.73
3,306.00
18.86
353.72
3,295.93
3,210.06
81.99
-40.22
5,970,618.200
642,579.228
5.11
48.94
3,336.00
19.73
353.70
3,324.25
3,238.38
91.84
-41.31
5,970,628.030
642,577.955
2.90
51.09
3,406.00
22.08
357.62
3,389.64
3,303.77
116.73
-43.15
5,970,652.882
642,575.639
3.91
55.64
3,506.00
24.59
4.14
3,481.47
3,395.60
156.28
-42.43
5,970,692.429
642,575.609
3.60
59.25
3,606.00
27.53
9.21
3,571.30
3,485.43
199.86
-37.23
5,970,736.097
642,579.982
3.69
58.83
3,706.00
30.46
12.95
3,658.77
3,572.90
247.38
-27.85
5,970,783.792
642,588.458
3.44
54.70
3,801.81
32.23
12.39
3,740.59
3,654.72
296.01
-16.92
5,970,832.612
642,598.456
1.87
49.15
3,865.93
34.83
13.63
3,794.04
3,708.17
330.51
-8.94
5,970,867.256
642,605.784
4.19
44.98
3,960.44
39.21
15.07
3,869.48
3,783.61
385.61
5.20
5,970,922.613
642,618.867
4.72
36.95
4,055.57
43.83
15.81
3,940.69
3,854.82
446.38
22.00
5,970,983.679
642,634.509
4.88
26.88
4,149.28
47.24
16.40
4,006.32
3,920.45
510.62
40.56
5,971,048.256
642,651.842
3.67
15.45
4,243.75
50.29
17.18
4,068.58
3,982.71
578.62
61.09
5,971,116.631
642,671.074
3.29
2.47
4,339.62
53.49
18.13
4,127.74
4,041.87
650.48
83.97
5,971,188.913
642,692.590
3.43
-12.43
4,434.38
56.88
19.03
4,181.84
4,095.97
724.21
108.77
5,971,263.092
642,715.978
3.66
-29.0;
4,529.38
58.04
19.13
4,232.94
4,147.07
799.90
134.95
5,971,339.255
642,740.712
1.22
-46.78
4,624.25
57.99
19.00
4,283.19
4,197.32
875.95
161.23
5,971,415.789
642,765.544
0.13
-64.60
4,719.07
57.95
18.80
4,333.48
4,247.61
952.00
187.27
5,971,492.316
642,790.130
0.18
-82.18
4,813.53
58.06
19.23
4,383.53
4,297.66
1,027.74
213.37
5,971,568.532
642,814.785
0.40
-99.85
4,907.71
57.94
20.09
4,433.43
4,347.56
1,102.95
240.24
5,971,644.236
642,840.219
0.78
-118.35
5,001.45
57.97
20.23
4,483.17
4,397.30
1,177.54
267.63
5,971,719.326
642,866.179
0.13
-137.42
5,096.94
58.02
19.91
4,533.78
4,447.91
1,253.60
295.42
5,971,795.893
642,892.514
0.29
-156.74
5,191.76
58.08
19.87
4,583.96
4,498.09
1,329.26
322.79
5,971,872.050
642,918.441
0.07
-175.69
5,286.22
58.07
19.70
4,633.91
4,548.04
1,404.70
349.93
5,971,947.986
642,944.138
0.15
-194.42
5,380.85
58.02
19.22
4,683.99
4,598.12
1,480.40
376.68
5,972,024.178
642,969.441
0.43
-212.74
5,475.24
58.06
19.21
4,733.96
4,648.09
1,556.02
403.03
5,972,100.280
642,994.353
0.04
-230.68
7/10/2017 4:36:16PM Page 5 COMPASS 5000.1 Build 81D
-0"#
sbp
BP
BAER
4-
Final Survey Report
F�UGHES
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project: Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Site: PB J Pad
MD Reference:
J -28A Actual @ 85.87usft (Parker 272 Actual)
Well: J-28
North Reference:
True
Wellbore: J-28APBI
Survey Calculation Method:
Minimum Curvature
Design: J-28APB1
Database:
EDM RSK- Alaska PROD -ANCPl
Survey
MD
Inc
Azl (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
("HOOusft)
(usft)
5,570.10
57.95
19.66
4,784.22
4,698.35
1,631.89
429.80
5,972,176.635
643,019.672
0.42
-249.00
5,664.58
58.05
19.91
4,834.28
4,748.41
1,707.28
456.92
5,972,252.525
643,045.353
0.25
-267.7
5,758.29
57.93
19.66
4,883.96
4,798.09
1,782.05
483.82
5,972,327.788
643,070.823
0.26
-286.30
5,853.62
57.76
19.31
4,934.69
4,848.82
1,858.14
510.74
5,972,404.365
643,096.290
0.36
-304.75
5,947.16
57.75
19.33
4,984.60
4,898.73
1,932.79
536.91
5,972,479.502
643,121.039
0.02
-322.61
6,042.58
57.94
19.89
5,035.38
4,949.51
2,008.89
564.03
5,972,556.095
643,146.698
0.54
-341.25
6,137.28
57.86
19.81
5,085.71
4,999.84
2,084.35
591.27
5,972,632.049
643,172.497
0.11
-360.09
6,231.80
57.80
20.58
5,136.03
5,050.16
2,159.44
618.89
5,972,707.644
643,198.682
0.69
-379.34
6,326.45
57.84
21.05
5,186.44
5,100.57
2,234.32
647.35
5,972,783.047
643,225.719
0.42
-399.46
6,421.21
57.76
21.50
5,236.94
5,151.07
2,309.04
676.45
5,972,858.301
643,253.386
0.41
-420.22
6,515.82
57.83
21.42
5,287.36
5,201.49
2,383.54
705.74
5,972,933.342
643,281.250
0.10
041.20
6,610.67
57.81
21.61
5,337.88
5,252.01
2,458.23
735.18
5,973,008.568
643,309.265
0.17
062.31
6,705.55
57.84
21.23
5,388.40
5,302.53
2,532.99
764.51
5,973,083.868
643,337.165
0.34
083.30
6,800.35
58.02
21.27
5,438.73
5,352.86
2,607.86
793.62
5,973,159.273
643,364.850
0.19
-504.06
6,895.33
58.02
20.85
5,489.04
5,403.17
2,683.04
822.57
5,973,234.988
643,392.365
0.38
-524.63
6,990.61
58.09
20.57
5,539.45
5,453.58
2,758.67
851.16
5,973,311.138
643,419.511
0.26
-544.79
7,084.76
58.02
20.00
5,589.27
5,503.40
2,833.61
878.86
5,973,386.581
643,445.778
0.52
-564.1
7,178.86
58.00
19.61
5,639.12
5,553.25
2,908.70
905.90
5,973,462.165
643,471.385
0.35
-582.81
7,273.57
58.06
19.90
5,689.27
5,603.40
2,984.31
933.06
5,973,538.277
643,497.097
0.27
-601.55
7,368.22
58.04
20.26
5,739.35
5,653.48
3,059.74
960.63
5,973,614.212
643,523.229
0.32
-620.72
7,462.90
57.95
20.89
5,789.53
5,703.66
3,134.91
988.85
5,973,689.895
643,550.009
0.57
-640.56
7,558.10
54.24
20.38
5,842.63
5,756.76
3,208.84
1,016.70
5,973,764.333
643,576.444
3.92
-660.17
7,652.77
50.19
19.58
5,900.62
5,814.75
3,279.13
1,042.27
5,973,835.097
643,600.674
4.33
-677.91
7,747.56
46.65
19.36
5,963.53
5,877.66
3,345.98
1,065.91
5,973,902.382
643,623.036
3.74
-694.10
7,841.74
42.85
18.06
6,030.39
5,944.52
3,408.75
1,087.19
5,973,965.535
643,643.121
4.15
-708.41
7,936.32
39.34
17.43
6,101.66
6,015.79
3,467.95
1,106.15
5,974,025.077
643,660.947
3.74
-720.78
8,031.73
35.52
16.19
6,177.41
6,091.54
3,523.44
1,122.94
5,974,080.873
643,676.681
4.08
-731.41
7/102017 4: 36 16P Page 6 COMPASS 5000.1 Build 81D
BID ER
10044,. --by Final Survey ReportI UGHES
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project:
Prudhoe Bay
TVD Reference:
J -28A Actual @ 85.87usft (Parker 272 Actuati
Site:
PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well:
J-28
North Reference:
True
Wellbore:
J-28APB7
Survey Calculation Method:
Minimum Curvature
Design:
J-28APB7
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
(usft)
8,126.03
31.74
15.56
6,255.91
6,170.04
3,573.66
1,137.24
5,974,131.352
643,690.019
4.03
-740.1,
8,221.25
28.17
15.35
6,338.40
6,252.53
3,619.47
1,149.91
5,974,177.398
643,701.818
3.75
-747.73
8,315.86
24.05
15.74
6,423.34
6,337.47
3,659.58
1,161.06
5,974,217.708
643,712.199
4.36
-754.43
8,411.18
19.76
15.68
6,511.76
6,425.89
3,693.81
1,170.68
5,974,252.106
643,721.174
4.50
-760.27
8,505.50
15.37
16.01
6,601.66
6,515.79
3,721.19
1,178.44
5,974,279.626
643,728.412
4.66
-764.99
8,599.19
11.61
15.27
6,692.74
6,606.87
3,742.22
1,184.35
5,974,300.770
643,733.920
4.02
-768.57
8,693.63
8.58
10.08
6,785.71
6,699.84
3,758.33
1,188.09
5,974,316.944
643,737.349
3.35
-770.52
8,789.04
4.99
357.46
6,880.45
6,794.58
3,769.49
1,189.15
5,974,328.118
643,738.199
4.05
-770.36
8,862.69
3.52
308.60
6,973.86
6,887.99
3,775.35
1,186.72
5,974,333.935
643,735.660
4.02
-767.30
8,977.77
3.65
253.20
7,068.78
6,962.91
3,776.30
1,181.54
5,974,334.783
643,730.464
3.51
-762.05
9,073.37
4.61
241.15
7,164.14
7,078.27
3,773.56
1,175.27
5,974,331.931
643,724.239
1.35
-756.11
9,167.99
6.26
240.14
7,258.33
7,172.46
3,769.16
1,167.46
5,974,327.380
643,716.520
1.75
-748.83
9,262.81
8.43
240.00
7,352.36
7,266.49
3,763.11
1,156.96
5,974,321.132
643,706.134
2.29
-739.05
9,357.28
10.16
239.08
7,445.59
7,359.72
3,755.37
1,143.81
5,974,313.140
643,693.138
1.84
-726.83
9,451.97
12.21
239.36
7,538.48
7,452.61
3,745.97
1,128.03
5,974,303.447
643,677.539
2.17
-712.17
9,546.84
14.34
239.92
7,630.81
7,544.94
3,734.97
1,109.23
5,974,292.090
643,658.953
2.25
-694.6:
9,641.31
16.67
238.45
7,721.83
7,635.96
3,722.01
1,087.56
5,974,278.726
643,637.532
2.50
-674.56
9,735.74
18.51
236.75
7,811.84
7,725.97
3,706.71
1,063.48
5,974,262.966
643,613.749
2.02
-652.29
9,830.25
20.22
236.69
7,901.00
7,815.13
3,689.51
1,037.28
5,974,245.276
643,587.885
1.81
-628.13
9,924.12
22.12
237.63
7,988.53
7,902.66
3,671.14
1,008.79
5,974,226.367
643,559.755
2.06
-601.82
10,019.80
24.08
238.82
8,076.54
7,990.67
3,651.39
976.88
5,974,206.013
643,528.221
2.11
-572.25
10,114.46
26.08
238.92
8,162.27
8,076.40
3,630.64
942.53
5,974,184.624
643,494.279
2.11
-540.37
10,209.75
28.04
239.07
8,247.12
8,161.25
3,608.32
905.37
5,974,161.596
643,457.558
2.06
-505.88
10,303.83
29.41
238.64
8,329.63
8,243.76
3,584.93
866.68
5,974,137.479
643,419.317
1.47
-469.97
10,398.92
31.39
239.59
8,411.64
8,325.77
3,560.24
825.38
5,974,112.012
643,378.499
2.14
-431.62
10,493.16
33.31
239.64
8,491.25
8,405.38
3,534.74
781.88
5,974,085.687
643,335.496
2.04
-391.16
10,588.25
35.79
240.25
8,569.56
8,483.69
3,507.74
735.20
5,974,057.808
643,289.344
2.63
-347.71
7/102017 4:36,16PM Page 7 COMPASS 5000.1 Build 81D
BP
Zy by Final Survey Report B FUGHES
►0
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project:
Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Site:
PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well:
J-28
North Reference:
True
Wellbore:
J-28APB1
Survey Calculation Method;
Minimum Curvature
Design:
J-28APB1
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
NDSS
NIS
PJW
Northing
Easting
DLeg
V. Sec
(usR)
(I
(')
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
('MOousft)
(usft)
10,630.03
36.87
239.91
8,603.22
8,517.35
3,495.39
713.75
5,974,045.057
643,266.132
2.63
-327.74
10,669.00
38.09
240.00
8,634.14
8,548.27
3,483.52
693.23
5,974,032.798
643,247.838
3.12
-308.6'
7"
10,683.54
38.54
240.03
8,645.55
8,559.68
3,479.01
685.42
5,974,028.146
643,240.118
3.12
-301.36
10,716.37
41.28
237.19
8,670.74
8,584.87
3,468.03
667.45
5,974,016.827
643,222.364
10.02
-284.70
10,747.40
45.00
236.37
8,693.37
8,607.50
3,456.41
649.71
5,974,004.866
643,204.846
12.12
-268.34
10,777.75
47.88
238.09
8,714.29
8,628.42
3,444.51
631.22
5,973,992.623
643,186.583
10.34
-251.25
10,810.65
51.20
237.26
8,735.63
8,649.76
3,431.13
610.07
5,973,978.837
643,165.695
10.27
-231.69
10,842.08
54.58
237.57
8,754.59
8,668.72
3,417.63
588.95
5,973,964.944
643,144.840
10.78
-212.16
10,872.98
56.70
239.10
8,772.03
8,686.16
3,404.24
567.24
5,973,951.149
643,123.389
7.99
-192.06
10,907.12
60.02
239.58
8,789.94
8,704.07
3,389.43
542.24
5,973,935.860
643,098.677
9.80
-168.82
10,937.21
63.83
240.97
8,804.10
8,718.23
3,376.27
519.19
5,973,922.269
643,075.880
13.30
-147.35
10,967.31
67.41
240.47
8,816.52
8,730.65
3,362.86
495.28
5,973,908.410
643,052.232
11.99
-125.04
10,998.96
70.88
241.56
8,827.79
8,741.92
3,348.54
469.41
5,973,893.595
643,026.642
11.43
-100.89
11,031.66
74.06
242.94
8,837.64
8,751.77
3,334.02
441.82
5,973,878.561
642,999.333
10.52
-75.05
11,062.24
77.85
241.33
8,845.06
8,759.19
3,320.16
415.60
5,973,864.201
642,973.384
13.40
-50.50
11,094.24
81.36
240.11
8,850.83
8,764.96
3,304.76
388.15
5,973,848.291
642,946.236
11.59
-24.9r
11,125.61
85.30
239.11
8,854.47
8,768.60
3,289.00
361.28
5,973,832.024
642,919.672
12.95
O.M
11,158.34
88.95
238.93
8,856.11
8,770.24
3,272.16
333.26
5,973,814.673
642,891.978
11.17
26.10
11,188.84
91.75
238.30
8,855.93
8.770.06
3,256.30
307.22
5,973,798.300
642,866.253
9.41
50.25
11,220.16
95.24
236.33
8,854.02
8,768.15
3,239.42
260.92
5,973,780.926
642,840.274
12.79
74.55
11,250.84
98.35
237.19
8,850.39
8,764.52
3,222.72
255.44
5,973,763.749
642,815.121
10.51
98.05
11,283.21
99.60
240.73
8,845.34
8,759.47
3,206.24
228.05
5,973,746.748
642,788,052
11.47
123.48
11,314.82
103.70
242.08
8,838.96
8,753.09
3,191.42
200.88
5,973,731.419
642,761.166
13.63
148.87
11,345.98
107.84
242.15
8,830.49
8,744.62
3,177.40
174.38
5,973,716.897
642,734.940
13.29
173.68
11,378.41
111.18
240.44
8,819.66
8,733.79
3,162.73
147.57
5,973,701.716
642,708.417
11.44
198.73
11,409.67
112.27
240.23
8,808.09
8,722.22
3,148.35
122.34
5,973,686.868
642,683.464
3.54
222.24
711012017 4:36.16PM Page 6 COMPASS 5000.1 Build 81D
r
by
BP
BAFUGHES
%Nar
Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well J-28
Project: Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Site: PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Wall: J-28
North Reference:
True
Wellbore: J-28APB1
Survey Calculation Method:
Minimum Curvature
Design: J-28APB1
Database:
EDM RSK- Alaska PROD -ANCPt
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
[usft)
(usft)
(usft)
(°HOOusft)
(usft) -
11,440.25
112.60
240.22
8,796.42
8,710.55
3,134.32
97.80
5,973,672.369
642,659.203
1.08
245.0<-
11,523.02
111.84
238.79
8,765.12
8,679.25
3,095.43
31.78
5,973,632.240
642,593.939
1.84
306.47
11,584.05
110.82
237.55
8,742.92
8,657.05
3,065.45
-16.52
5,973,601.346
642,546.224
2.52
351.21
11,620.12
109.64
236.42
8,730.44
8,644.57
3,047.01
-44.89
5,973,582.371
642,518.203
4.40
377.40
11,647.97
107.79
235.13
8,721.51
8,635.64
3,032.17
-66.70
5,973,567.124
642,496.684
7.96
397.46
11,677.96
106.23
235.03
8,712.74
8,626.87
3,015.76
-90.21
5,973,550.265
642,473.488
5.21
419.04
11,713.83
104.86
234.04
8,703.12
8,617.25
2,995.71
-118.36
5,973,529.685
642,445.732
4.65
444.82
11,742.11
102.60
232.73
8,696.41
8,610.54
2,979.32
-140.41
5,973,512.885
642,424.001
9.17
464.95
11,772.03
100.19
231.80
8,690.50
8,604.63
2,961.37
-163.60
5,973,494.499
642,401.155
8.61
486.04
11,809.45
97.38
230.94
8,684.78
8,598.91
2,938.29
-192.49
5,973,470.871
642,372.716
7.85
512.24
11,838.08
95.34
230.77
8,681.61
8,595.74
2,920.32
-214.55
5,973,452.494
642,350.996
7.15
532.21
11,867.39
93.98
230.01
8,679.23
8,593.36
2,901.70
-237.06
5,973,433.447
642,328.851
5.31
552.54
11,901.30
94.14
230.06
8,676.83
8,590.96
2,879.97
-262.98
5,973,411.233
642,303.346
0.49
575.94
11,961.59
94.26
229.56
8,672.42
8,586.55
2,841.17
-308.91
5,973,371.568
642,258.163
0.85
617.36
12,055.55
92.68
228.66
8,666.73
8,580.86
2,779.78
-379.81
5,973,308.844
642,188.451
1.93
681.13
12,150.92
90.09
227.95
8,664.42
8,578.55
2,716.37
-451.00
5,973,244.095
642,118.490
2.82
744.9r
12,245.98
90.23
227.64
8,664.16
8,578.29
2,652.51
-521.41
5,973,178.913
642,049.307
0.36
807.98
12,340.85
90.17
227.38
8,663.83
8,577.96
2,588.43
-591.37
5,973,113.520
641,980.587
0.28
870.52
12,433.94
90.26
227.78
8,663.48
8,577.61
2,525.63
-660.09
5,973,049.436
641,913.078
0.44
931.97
12,529.49
90.14
227.58
8,663.14
8,577.27
2,461.30
-730.74
5,972,983.779
641,843.670
0.24
995.17
12,624.07
90.20
228.33
8,662.86
8,576.99
2,397.96
-800.97
5,972,919.119
641,774.656
0.80
1,058.07
12,718.68
90.36
228.45
8,662.40
8,576.53
2,335.14
-871.71
5,972,854.965
641,705.131
0.21
1,121.52
12,812.71
89.52
228.67
8,662.50
8,576.63
2,272.90
-942.20
5,972,791.410
641,635.843
0.92
1,184.79
12,907.76
89.13
228.60
8,663.62
8,577.75
2,210.09
-1,013.53
5,972,727.260
641,565.724
0.42
1,248.84
13,002.81
88.33
228.63
8,665.73
8,579.86
2,147.27
-1,084.83
5,972,663.098
641,495.640
0.84
1,312.85
13,096.30
86.35
226.89
8,670.07
8,584.20
2,084.50
-1,153.96
5,972,599.027
641,427.717
2.82
1,374.71
13,130.05
86.54
224.33
8,672.16
8,586.29
2,060.94
-1,178.03
5,972,575.014
641,404.102
7.59
1,396.07
7/10/2017 4:36: 16PM Page 9 COMPASS 5000.1 Build 81D
-%1Nr
i i by
Vertical
BP
Final Survey ReportI
UGHES
r�Ne
Depth
Diameter
mpany
(usft)
lust[) Name
(in)
(in)
Company:
North America - ALASKA -BP
Local Co-ordinate Reference:
Well J-28
Project:
Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Site:
PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well:
J-28
North Reference:
True
Wellbore:
J-28APB1
Survey Calculation Method:
Minimum Curvature
Design:
J-28APB1
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
Vertical
Casing
Hole
Depth
Depth
Diameter
Diameter
(usft)
lust[) Name
(in)
(in)
2,954.21
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
)usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
13,161.58
85.41
222.97
8,674.37
8,588.50
2,038.18
-1,199.74
5,972,551.850
641,382.831
5.60
1,415.16
13,190.73
85.62
222.76
8,676.65
8,590.78
2,016.88
-1,719.51
5,972,530.180
641,363.471
1.02
1,432.4'
13,225.34
85.74
220.22
8,679.26
8,593.39
1,991.03
-1,242.37
5,972,503.902
641,341.107
7.33
1,452.39
13,256.24
85.37
220.27
8,681.65
8,595.78
1,967.51
-1,262.27
5,972,480.015
641,321.656
1.21
1,469.60
13,285.21
85.77
219.72
8,683.89
8,598.02
1,945.39
-1,280.84
5,972,457.541
641,303.517
2.34
1,485.64
13,320.01
86.27
219.43
8,686.31
8,600.44
1,918.63
-1,302.95
5,972,430.368
641,281.915
1.66
1,504.70
13,351.13
86.95
218.06
8,688.15
8,602.28
1,894.40
-1,322.40
5,972,405.776
641,262.938
4.91
1,521.38
13,378.91
87.01
216.81
8,689.61
8,603.74
1,872.37
-1,339.26
5,972,383.434
641,246.499
4.50
1,535.74
13,413.59
87.25
215.46
8,691.35
8,605.48
1,844.40
-1,359.68
5,972,355.080
641,226.611
3.95
1,552.98
13,474.56
88.79
214.89
8,693.45
8,607.58
1,794.59
-1,394.78
5,972,304.621
641,192.466
2.69
1,582.43
13,508.14
92.25
215.79
8,693.15
8,607.28
1,767.21
-1,414.20
5,972,276.872
641,173.572
10.65
1,598.75
13,537.55
95.05
216.64
8,691.28
8,605.41
1,743.53
-1,431.54
5,972,252.871
641,156.688
9.95
1,613.40
13,569.08
96.78
217.63
8,688.03
8,602.16
1,718.53
-1,450.47
5,972,227.516
641,138.236
6.31
1,629.48
13,611.00
96.78
217.63
8,683.08
8,597.21
1,685.56
-1,475.89
5,972,194.074
641,113.454
0.00
1,651.15
Projection to TD
Casing Points
Measured
Vertical
Casing
Hole
Depth
Depth
Diameter
Diameter
(usft)
lust[) Name
(in)
(in)
2,954.21
2.953.56 9 5/8"
9.625
12.250
10,669.00
8,634.14 7"
7.000
7.500
7/102017 4: 36: 16PM Page 10 COMPASS 5000.1 Build 81D
•�:b BP B ER
%044,2 p Final Survey Report BT
Yq, EM
Company:
North America -ALASKA - BP
Project:
Prudhoe Bay
Site:
PB J Pad
Well:
J-28
Wellbore:
J-28APB1
Design:
J-28APB1
Formations
Measured
Vertical
Local Coordinates
Depth
Depth
Depth
(usft)
(usft)
9,258.00
7,347.60
TKNG
7,462.00
5,789.05
CM3
4,888.00
4,422.98
UG3
6,153.00
5,094.07
UG1
3,293.00
3,283.61
SV2
7,796.00
5,997.37
CM2
6,682.00
5,375.86
WESTSAK2
10,667.00
8,632.57
TSGR
4,361.00
4,140.35
UG4A
7,055.00
5,573.51
WEST SAK 1
3,714.00
3,665.66
SVi
10,837.00
8,751.63
TSAD
2,952.21
2,951.57
SV4
9,142.00
7,232.48
LCU/rMLV
10,719.00
8,672.71
SHUBLIK
6,943.00
7,034.08
CM1
4,301.00
4,104.42
UG4
3,153.00
3,149.06
SV3
Design Annotations
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Dip
Dip Direction
Name Limology, (I (I
Measured
Vertical
Local Coordinates
Depth
Depth
.NI -S
+E1 -W
(usft)
(usft)
(usft)
(usft)
Comment
2,908.76
2,908.32
8.46
-10.01
TIP
2,953.00
2,952.36
10.52
-13.67
KOP-TOWS
13,611.00
8,683.08
1,685.56
-1,475.89
Projection to TD
Well J-28
J-28AActual @ 85.87usft (Parker 272 Actual)
J-28AActual @ 85.87usft (Parker 272 Actual)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes a GE Company
7/102017 4:36,16PM Page 11 COMPASS 50001 Build SlD
Link, Liz M (DOA)
From: Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Sent: Monday, August 28, 2017 4:13 PM
To: AOGCC Reporting (DOA sponsored)
Subject: PBU J -28A / PTD # 217-075
Hello,
Please reference the following well:
Well Name: PBU J -28A
Permit #: 217-075
API #: 50-029-21721-01-00
Date of Test: 8/26/17
Type of Test: IPT (Initial Production Test)
Choke Size: 96
Choke Unit:
Production Method: Flowing
Duration (Hours Tested): 10
Top Reference (Top Pert MD): 11920'
Bottom Reference (Bottom Pert MD): 15520'
Tubing Flowing (Pressure): 1000
Casing Pressure: 1300
Total Test Rate (O, G, W): 383 / 16464 1 6
24 -Hour Rate (O, G, W): 918 / 39514 / 14
Gravity (Oil, API): 48.4
GOR (Gas -Oil Ratio): 43037
This well began Production on
Method of Operations on this date: August 25, 2017
RBDMS (,u 062' 9 2017
Wallace, Chris D (DOA)
From:
AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com>
Sent:
Monday, August 21, 2017 6:54 AM
To:
AK, GWO Well Testing WSL; AK, OPS EOC Specialists; AK, OPS GC2 Facility OTL, AK, OPS
GC2 Field O&M TL; AK, OPS GC2 OSM; AK, OPS GC2 Wellpad Lead; AK, OPS PCC Ops
Lead; AK, OPS Prod Controllers; AK, OPS Well Pad HUQ; AK, OPS Well Pad LV; AK, OPS
Well Pad MN; AK, OPS Well Pad RJ; AK, OPS WELL PAD S; AK, OPS Well Pad SW, AK,
OPS WELL PAD W; AK, OPS Well Pad Z; Ak, Ops West Area TL; AK, RES GPB East Wells
Opt Engr; AK, RES GPB West Wells Opt Engr, Bergene, Matthew; Frankenburg, Amy;
Peru, Cale; Rupert, C. Ryan; Shriver, Tyson; Wellman, Julie; Youngmun, Alex; Zoesch, Eric;
AK, GWO DHD Well Integrity; AK, GWO SUPT Well Integrity, AK, GWO Well Integrity
Well Information; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A;
Daniel, Ryan; Dempsey, David G; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis
J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R; Worthington,
Aras J
Cc:
Regg, James B (DOA); Wallace, Chris D (DOA)
Subject:
OPERABLE: Producer 1-28 (PTD# 2170750) New Rotary Sidetrack
up
Producer J-28 (PTD# 2170750) is a newly -completed rotary sidetrack. The rig performed a passing MIT -T to 3690psi and
MIT -IA to 3595psi on 07/14/17. The well is reclassified as Operable.
The next and final step of the post -rig program is flowback to a portable test separator.
Please be mindful of fluid packed annuli.
Please reply if in conflict with proposed plan.
Matt Ross
(Alternate: Josh Stephens)
Well Integrity Engineering
Office 907-659-8110
Cell 907-980-0552
Harmony 4530
From: AK, GWO Well Integrity Engineer
Sen: e 16, 2017 8:22 AM
To: AK, GWO WellIn ngineer; AK, OPS GC2 OSM; AK, OPS GC2 Facility OTL; AK, OPS GC2 Field O&M TL; AK, OPS
GC2 Wellpad Lead; AK, OPS We AK, OPS Prod Controllers; AK, OPS PCC Ops Lead; Cismoski, Doug A; Daniel,
Ryan; AK, RES GPB West Wells Opt Engr;��GPB East Wells Opt Engr; Wellman, Julie
Cc: AK, GWO DHD Well Integrity; AK, GWO Projects We4 Iterity; AK, GWO Completions Well Integrity; AK, GWO SUPT
Well Integrity; AK, OPS FF Well Ops Comp Rep; AK, GWO SU I Projects; AKIMS App User; Dempsey, David G;
Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; itch, Beau; Sternicki, Oliver R;
Worthington, Aras J
Subject: NOT OPERABLE: Producer 3-28 (PTD# 1870410) Sidetrack Prep
All,
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMIT' -)N
WEL. .OMPLETION OR RECOMPLETION REPT AND LOG
1a. Well Status: Oil 0 - Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
1b. Well Class:
20AAC 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One '
Development 0 Exploratory ❑
Service ❑ Stretigraphic Test ❑
2. Operator Name:
6. Date Comp., Susp., or Abend.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
7/15/2017
217-075 '
3. Address:
7. Date Spudded:
15. API Number:
P.O. Box 196612 Anchorage, AK 99519-6612
6/20/2017
50.029.21721-01-09
4a. Location of Well (Governmental Section):
8. Date TD Reached:
16. Well Name and Number:
7/8/2017
PBU J -28A '
Surface: 799 FNL, 1731' FEL, Sec. 09, TI IN, R1 3E, UM
9 Ref Elevations KB 85.87
17. Field/Pool(s):
Top of Productive Interval: 2684' FSL, 1030' FEL, Sec. 04, T1 IN, R13E, UM
GL 39.07 BF 39.52
PRUDHOE BAY, PRUDHOE OIL -
10. Plug Back Depth(MD/fVD):
I
18. Property Designation:
Total Depth: 24T FSL, 5161' FEL, Sec. 04, TIN, R13E, UM
• 15656'/ 8608' -
ADL 028281
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11. Total Depth (MD/TVD):
19. DNR Approval Number:
Surface: x- 642621 - y- 5970537 ' Zone - ASP 4
. 15750'18608' . _
85-24
TPI: x- 643248 y- 5974033 Zone- ASP4
12. SSSV Depth(MD/TVD):
20 Thickness of Permafrost MDr VD
Total Depth: x- 639170 y- 5971518 Zone - ASP 4
None
2063'/ 2063'
5. Directional or Inclination Survey: Yes 0 (attached) No ❑
13. Water Depth, if Offshore:
21. Re-drill/Lateral Top Window
Submit electronic and printed information per 20 AAC 25.050
N/A (ft MSL)
MDfFVD:
2953'12952'
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MWD/GR/RES, MWD /GR/RES /DEN /NEU
23. CASING, LINER AND CEMENTING RECORD
CASING
WT, PER
FT
GRADE
SETTING DEPTH MD SETTING DEPTH TVD
HOLE SIZEAMOUNT
CEMENTING RECORD
PULLED
TOp BOTTOM TOP
BOTTOM
20"
Conductor
49' 129' 49'
129'
8 cu yds Concrete
13-3/8"
72#
Lawsoa%
48' 2682' 48'
2682'
17-1/2"
3723 cu ftr Permafrost C
9-5/8"
47"
LA0
46' 2953' 46'
2952'
12-1/4"
2167 cu It Class'G'
7"
26#
Lao
2787' 10669' 2787'
8634'
9-7/8"x8-1/2"
403 sx Class' G'
4-1/2'
12.6#/13.5#
I -M
10495' 15748' 8492'
8608'
6-1/8"
576 sx Class'G'
24. Open to production or injection? Yes 0 No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number):
GRADE DEPTH SET (MD) PACKER SET (MD/TV
4-1/2" 12.6# 13Cr85 10512' 10389'/ 8403-
2-7/8" Gun Diameter, 6 sof
11920'- 12920' 8681'-8675'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
13300'- 13650' 868T - 8662'
Was 0AAChydraulic .283 (i (2 used during completion? yes ❑ No 0 .
Per AAC 25.283 (i)(2) attach electronic and printed
�
14185'- 14675' 8649' - 8634' I� E C E I V E D
15150'- 15520' 8626' - 8611'
RECEIVED
B ■
information
m
COMPLETION
AT AUG 14 2017
DEPTHINTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED
2200' Freeze Protect w/ 151 Bbls Diesel
I
1VERIFIED
-01
Anr%f%^
27. PRODUCTION TEST
Date First Production: Not on Protluctlon
Melhotl of Operation (Flowing, gas lift, etc.): N/A
Data of Test:
Hours Tested:
Production for
Oil -Bbl:
Gas -MCF:
Walar-Bbl:
Choke Size:
Gas -Oil Ratio:
Test Pence �►
Flow Tubing
Press
Casino Press:
Calculated
24 Hour Rale
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Oil Gravity- API (me):
Form 10.407 Revis&d 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only
TTT
�`��� �--Ie RBDMS LL, AUG 1 5 2017
28. CORE DATA ( Conventional Com(s) Yes ❑ No ® y Sidewall Cores Yes ❑ No m
If Yes to either question, list fbnations and intervals cared (MD+TVD of top and bottom of each), and summarize lithology and presenceof oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratoryanalytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered): 30, FORMATION TESTS
NAME
MID
TVD
Permafrost - Top
Well Tested? Yes ❑ No RI
Permafrost- Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
10668'
8633' separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Ugnu
4298'
4103'
West Sak
6685'
5377'
Colville Mudstone
7461'
5789'
HRZ
8943'
7034'
Base of HRZ
9140'
7230'
Kingak
9258'
7348'
Sag River
10668'
8633'
ShublikA
10719'
8673'
Shublik B
10779'
8715'
Shublik C
10808'
8734'
Sadlerochit - Zone 4
10837'
8752'
Shublik C (Invert)
11564'
8767'
Shublik B
11622'
8747'
ShublikA
11683'
8728'
Sag River
11900'
8684'
Shublik A(Revert)
12932'
8675'
Sag River (Fault)
13183'
8686' '
Formation at total depth:
Sag River
13183'
8686'
31. List of Attachments: LOT / FIT Summary, Summary of Daily Drilling Reports, Surveys, Cement Reports, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32.1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Reese, J. Kyle
Authorized Title: Informs n and Data troller Contact Email: john.mese@bp.com
Authorized Signature:A- k ate: C%� /I� Contact Phone: +1 9075644629
INSTRUCTIONS
General: This form is designed r submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10304 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated is
pool
a completion.
Item tb. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 41b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vesical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional Interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10407 Revised 5/2017 Submit ORIGINAL Only
OW 7-1/16'
-
MiCV Vi
I
ACTUATOR =
TYPE
VLV LATCH
OKB. EP/ =
77.11'
6
Rff ELEV =
85.87'
20' COND,110'
KBG-2
BF. EF/ =
39.57
91.58, H40,
5
KOP=
2953'
D = 19.124'
KBG-2
Max Angle =
111_' Q 11524'
07114/17
4
_
Datum AD=
10837'
24
' CSG, 72#, L-80, BTPS, D = 12.347' 267W _ J
9-5/8• WHIPSTOCK (0620/17) 2863'
8- CSG. 47#. L-80, NSCC, D = 8.681' -2863'
Minimum ID = 3.725"@ 10495'
41/2" HES XN NIPPLE
SAF 'NOTES: WELL ANGLE > -70" @ 10983'.
J —2 8 A **TBG DEPTHS�ADJUSTED 1 I'DEEPER**
11062'. —CHROME 8 LNR"•
I2014' 4-12' HES X NP, 10 = 3.813'
1TI—I9-5/8' X T WFD LTP w RACK
WFD HGR, D = 6.18-
MILLOU'r WINDOW (J -28A) 2953' - 2967'
GAS I FT MANTIRR C
8
ST
MJ
TVD
—NN
TYPE
VLV LATCH
PORIFJ
DATE
6
3610
3575
28
KBG-2
DCK-2 BE(
-
07114/17
5
6711
5391
58
KBG-2
CIMY BK
0
07114/17
4
8321
6428
24
KBG-2
OMY BK
0
07/14/17
3
9099
7190
5
KBG-2
DAN BK
0
07114/17
2
9715
7792
18
KBG-2
DAN BK
0
07/14/17
1
10327
8350
30
KBG-2
DAN BK
0
07/14/17
14-12'HES X W. D=3.813' 1
FPS XN
10495' 7' X 5' WFD LTPw R933AI
TOP OF 41/2- LNR 10496' HGR D = 3.92'
10612' 4-12' WLEG, D= 3.958'
13CR-BS VAM TOP, 10512'
D == 3.9 3.958'
„\10616' 5'X4-12'XO. D=3.92
7- LNR 26#, L-80 VAM TOP HC,
10669'
0383 bpf, D = 6.276'
I
0925187
ORK;lKgL COMPLETION
' LNR 12.6#, 13CR-85 HYD 521,
12865'
bpf, D = 3.958'
fMlO
PERFORATION SUMMARY
Pff LOG: BAKER LWD ON 07/08/17
ANGLE AT TOP PERF: 97' @ 11920'
Pbte: Refer to Roduotion DB for hi5tDmal perf data
2-7/8-1 6 1 13300-136500 07/13/17
2-7/8' 6 14185-146 75 O 07/13/17
2-7ffi-1 6 1 15150-155210 O 07/13117
41/2" LNR, 13.5#, 13CR-85 HYD 521,
.0149 bpf, D = 3.920'
DA TE
REV BY
COMMENTS
DATE RE / BY OOM+@LTS
0925187
ORK;lKgL COMPLETION
07/12106
WEi
fMlO
07115/17
P-272
SIDETRACK (J -28A)
07117/17
JMD
DRLG HO CORRECTIONS
07/31117KTLJAD
FNALODEAPPROVAL
08114/17
KR/JMD
ADt1USTH) TBG DE'RI51II
3.856'
F-17i�i
PRUDHOE BAY INF
WELL J -28A
PERMT ND: 217-075
AR ND: 50029-21721-01
T11 N, RI 3F 799 FW 8 1737 FEL
BP Explora0on (Alaska)
Page 1 of 1
BP AMERICA
LOT / FIT Summary
Well Name: J -28A
Surface
Leak Off
Test
Test
Test Depth
Test Depth AMW
Pressure
Pressure
EMW
Date
Type
(TMD -Ft)
(TVD -Ft) (ppg)
(psi)
(BHP) (psi)
(ppg)
06/20/17
LOT
2,953.00
2,952.36 9.70
620.00
2,107.69
13.74
06/30/17
FIT
10,670.00
8,635.00 8.60
610.00
4,467.72
9.96
Page 1 of 1
Printed 8/8/2017 11:19:44AM 'All depths reported in Drillers Depths`
North Amenca
- ALASKA - BP
Page 1 of 47
Operation Summary
Report
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/16/2017
End Date: 7/8/2017
%3 -0184N -C: (8,648,145.00)
Project: PrudhoeBay
Site: PB J Pad
Rig Name/No.: PARKER 272
Spud Date/Tme: 5/17/1987 12:00:00AM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-28AActual @85.87usfi (above Mean Sea Level)
Date From - To
Him
Task Code NPT
Total Depth Phase
Description of Operations
__
hr
(usiq
6/16/2017 18:00 - 19:00
1.00
RIGD P
PRE
BEGIN EVENT WITH PARKER RIG 272 AT 18:00
GENERAL RIG DOWN OPERATIONS ON L2-29:
- SKID CATTLE CHUTE AND RIG FLOOR TO
TRAVEL POSITION
- LOWER PIPE SKATE
- LAY OVER DERRICK 390K ON RACK
19:00 - 20:00
1.00
RICO P
PRE
DISCONNECT SERVICE LINES AND
ELECTRICAL LINES IN INNER CONNECTS.
REMOVE ROOF CAPS AND FLOOR PLATES.
TURN TIRES AND INSTALL TIE RODS.
20:00 - 23:00
3.00
RICO P
PRE
SPLIT MODULES AND MOVE OFF OF 1.2-29.
STAGE ALL THREE MODULES AT ENTRANCE
TO THE DRILL SITE FOR MOVE.
23:00 - 00:00
1.00
RIGID P
PRE
MOVE MODULES FROM L2 TO DS 18 ON WAY
TO J-28 _
6/17/2017 00:00 - 05:00
5.00
RIGU P
PRE
MOVE RIG ALONG WEST DOCK ROAD TO
WEST DOCK STAGING AREA ON WAY TO J-28.
05:00 - 20:00
15.00
RIGU N
PRE
STAGE RIG ON WEST DOCK STAGING AREA
AND WAIT FOR PRE -RIG WORK AND PAD
PREP COMPLETION ON J-28,
OPPORTUNISITIC GENERAL RIG
MAINTENANCE:
- REPAIR AND REPLACE PADS BETWEEN
MODULES
- PERFORM WELDING AND GENERAL
MAINTENANCE PROJECTS
- INSTALL GUTTERS AROUND RIG.
20:00 - 00:00
4.00
RIGU P
PRE
MOVE RIG TOWARDS J PAD
-MIDNIGHT UPDATE: RIGATKPADACCESS
ROAD ON K -E -G ROAD MOVING TOWARD
PAD ACCESS ROAD
6/18/2017
00:00 - 03:00
3.00
RIGU P
-0.79 PRE
MOVE RIG FROM K -PAD ACCESS ROAD TO
03:00 - 15:00
12.00
RIGU N
-0.79 PRE
J -PAD
STAGE MODULES ON J PAD WHILE WAITING
ON COMPLETION OF PAD PREP, LEVELING
PADAND LAYING RIG MATS IN FRONT OF
WELL HOUSES
-REPAIR DRILL MODULE DRIVE MOTORS
-PERFORM GENERAL MAINTENANCE IN MUD
MODULE
- PAINT NONSLIP IN FRONT OF PALLET LIFT
- TOTAL OF 27 HOURS OF RIG WAITING TIME
FOR COMPLETION OF PAD PREP AND PRE
RIG WORKTO BE COMPLETED
- 21 TOTAL MILES MOVED IN 16 HOURS ON
THE ROAD =1.3 MPH AVERAGE MOVE
SPEED.
F1500 - 1830
3.50
RIGU P
-079 PRE
SPOT MODULES OVER WELL
- SPOT DRILL MODULE OVER WELL (-2
HOURS).
- SPOT UTILITY MODULE AND BUTTON UP TO
DRILL MODULE.
- SPOT MUD MODULE AND BUTTON UP TO
DRILL MODULE.
Printed 8/8/2017 11:19:44AM 'All depths reported in Drillers Depths`
North America - ALASKA - BP
Operation Summary Report
Page 2 of 47
Common Well Name: J-28
T—
OF TREE.
--.
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/16/2017
End Date: 7/8/2017
X3 -0184N -C: (8,648,145.00 )
Site: PB J Patl
- HANDOVER COMPLETE WITH WELLS
Project: Prudhoe Bay -
Rig Name/No.: PARKER 272
Spud DateRme: 5/17/1987 12:00:00AM
I Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
SPUOI: USA00000397
Active datum: J -28A Actual @J85.87usft (above Mean Sea Level)
AA
Data From -To Hrs
Task Code
NPT
Total Depth
Phase
Description of Operations
_ (hr)
_
(usft)
RIG
18:30 - 19:30 1.00
RIGU
P
-0.79
PRE
GENERAL RIG UP OPERATIONS:
PREPARE TO TEST BPV
- RECONNECTALL ELECTRICAL
- PRESSURE TEST SURFACE LINES 704000
PSI (PASSING TEST).
0200 - 0300
1.00
INTERCONNECTS.
PRE PRESSURE TEST BPV FROM BELOW WITH
SEAWATER TO 250 PSI LOW 13500 PSI HIGH
- PERFORM DERRICK INSPECTION.
19:30 - 20:00
0.50
RIGU
P
-0.79
PRE
RAISE THE MAST: 540 KLSS OFF THE RACK
20:00 20:30
0.50
RIGU
P
-0.79
PRE
SKID RIG FLOOR
- MAKEUP 4-1/2" IF X 7" TC -II CROSSOVER
- SKID FLOOR FROM DERRICK OVER
-INSTALL FMC BLANKING PLUG (WITH 10
POSITION TO WELL CENTER
SOPEAND LUBRICATOR PRESSURE TESTS.
- BUTTON UP HAUNCH TO THE RIG FLOOR
- SEPARATE TREE FROM ADAPTER IN BOP
DECK FOR INSPECTION.
- INSTALL FLOW LINE AT DRIP PAN AND RAISE
20:30 - 22:30
2.00
RIGU P
-0.79
PRE
CAT
_PIPE
GENERAL RIG UP OPERATIONS:
-RIG UP TONGS AND INSTALL OFFLINE
MOUSE HOLE EXTENSIONS
- RE -INSTALL MAN RIDERSAND PIN INTO
PLACE.
- BRIDLE DOWN AND RIG UP BLOCKS TO TOP
DRIVE. UNPIN FORUM CRANE. INSTALL
__
TORQUE TUBE PIN.
22:30 - 00:0
RIGU
P
-0.79
PRE
_
GENERAL RIG UP OPERATIONS
THROUGHOUT THE RIG
-PERFORM PRE -SPUD CHECKLISTS.
- TAKE ON 580 BBLS 140OF 8.5 PPG
SEAWATER TO PITS
- QUADCO REP ON LOCATION TO CHECK
PVT, FLOW SENSOR AND GAS WATCH.
!
SIMOPS: RIG UP TO PRESSURE TEST BPV
-LINEUP UP SECONDARY KILLTO THE IA.
- RIG UP SENSORS TO MONITOR IAAND TOP
Pnnted 8/8/2017 11:19.44AM *All depths reported in Drillers Depths'
T—
OF TREE.
--.
6119/2017 00:00 - 02:00
2.00
RIGU P
PRE RIG ACCEPT ON J-28AAT 00:01 ON6119/2017
- HANDOVER COMPLETE WITH WELLS
GROUP
- WELL HANDOVER CERTIFICATE IN PLACE
WITH GC -2 OPERATIONS AND WELLS GROUP
AA
- ALL PRE -RIG WORK CONFIRMED BY WSL
- PERMIT TO DRILL & SUNDRY POSTED ON
RIG
- 5-3/4" PUMP LINERS AND NC -50 SAVER SUB
INSTALLED
PREPARE TO TEST BPV
- PRESSURE TEST SURFACE LINES 704000
PSI (PASSING TEST).
0200 - 0300
1.00
WHSUR ! PP
PRE PRESSURE TEST BPV FROM BELOW WITH
SEAWATER TO 250 PSI LOW 13500 PSI HIGH
FOR 5 CHARTED MINUTES (PASSING TEST,
SEE ATTACHED TEST CHART)
03:00 - 04:30
1.50
WHSUR P
PRE NIPPLE DOWN TREE AND ADAPTER FLANGE
PER CAMERON REPRESENTATIVE.
- CLEAN AND INSPECT HANGER THREADS.
- MAKEUP 4-1/2" IF X 7" TC -II CROSSOVER
INTO HANGER WITH 7-1/4 TURNS.
-INSTALL FMC BLANKING PLUG (WITH 10
TURNS) TO ACTAS HARD BOTTOM FOR
SOPEAND LUBRICATOR PRESSURE TESTS.
- FUNCTION ALL LOCKDOWNS
- SEPARATE TREE FROM ADAPTER IN BOP
DECK FOR INSPECTION.
Pnnted 8/8/2017 11:19.44AM *All depths reported in Drillers Depths'
Printed a/8/2017 11:19:44AM 'All depths reported in Drillers Depths'
North America - ALASKA -
BP
Page 3 of 47
Operation Summary Report
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/16/2017 End Date: 7/8/2017
X3-0184NC: (8,648,145.00)
Project: Pmdhoe Bay
Site: PB J Pad
Rig Nam/No.: PARKER 272
Spud Date/time: 5/17/1987 12:00:OOAM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-26AAclual @85.87usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depen
Phase
Description of Operations
(hr)
(usft)
04:30 - 07:30 3.00
BOPSUR P
PRE
NIPPLE UP HIGH PRESSURE RISERS AND
BOPE
- TORQUE ALL BOLTS TO SPEC. INSTALL BELL
NIPPLE, HOLE FILL LINES AND TURN
BUCKLES.
-CHECK PRE -CHARGE PRESSURES ON
ACCUMULATOR BOTTLES
- RECORD RKB MEASUREMENTS AND SEND
IN RIG ELEVATION FORM.
CONFIGURATION FROM TOP TO BOTTOM:
13-5/8" SHAFFER SKANNULAR PREVENTER
4-1/2" X 7" CAMERON 5K VARIABLE BORE
RAMS
CAMERON 5K BLIND -SHEAR RAMS
MUDCROSS
2-7/8"X 5" CAMERON 5K VARIABLE BORE
RAMS
07.30 - 08:30 1.00
BOPSUR P
PRE
RIG UP TO PRESSURE TEST ROPE.
- MAKEUP TEST JOINT AND TESTS
ASSEMBLIES
PERFORM SHELL TEST 7O 3500 PSI
08:30 - 1230 4.00
BOPSUR P
PRE
TEST BOPE TO 250 PSI LOWAND 3500 PSI
HIGH FOR FIVE MIN EACH PER BP
STANDARDS AND AOGCC REGULATIONS
- TEST WITNESS WAIVED BY AOGCC
REPRESENTATIVE JEFF JONES
- TESTANNULAR PREVENTER WITH 4" & 5"
TEST JOINTS(LARGESTAND SMALLEST DP)
- TEST UPPER VBRS WITH 5" AND 7" TEST
JOINTS
- TEST LOWER VBRS WITH 4" AND S' TEST
JOINTS
- TEST RAM LOCKS ON INITIAL TEST AND
BACKSIDE OF DUAL -DIRECTION CHOKE
MANIFOLD VALVES
- COMPLETE BLACKOUT TEST
- NO FAILURES, SEE ATTACHED
_
12:30 _ 13:00 0.50
BOPSUR P
PRE
_DOCUMENTATION
RIG DOWN AFTER TESTING BOPE
13:00 - 13:30 0.50
_
WHSUR P
DECOMP
RIG UP DUTCH RISER AND LUBRICATOR FOR
PULLING BPV.
�13:30 - 14:00 0_.50
WHSUR P
DECOMP
PERFORM RIG EVACUATION DRILLAND HOLD
AAR WITH YEAROUT CREW
- PRESPUD MEETING WITH YEAROUT CREW
HELD DURING PRE -TOUR MEETING.
Printed a/8/2017 11:19:44AM 'All depths reported in Drillers Depths'
Common Well Name: J-28
Event Type: RE-ENTER- ONSHORE
I Rig Name/Ni
North America -ALASKA - BP
Operation Summary Report
Start Date: 6/16/2017 End Date: 7/8/2017
Active datum: J-28AActual @85.87usft (above Mean Sea Level)
Date From -To Him Task Code NPT Total Depth
_(hr) _14:(usft)
00 - 16:30 2.50 ! WHSUR P
1630 - 19:30 3.00
WHSUR P 2,989.00
19:30 - 21:00 1.50 WHSUR I P
2,989.00
Page 4 of 47
AFE No
X3-01841 (8,648,145.001
Rig Release: 7/15/2017
Phase
Description of Operations
DECOMP
PULL BACK PRESSURE VALVE WITH
LUBRICATOR AS FOLLOWS:
- PRESSURE TEST LUBRICATOR 70250/3500
PSI LEAKTIGHT CRITERIA (PASSING TESTS,
SEE ATTACHED CHART)
- BREAK OFF LUBRICATOR AT QUICK TEST
SUB
- RUN STAND OF 4"DRILLPIPE WITH
LEFT-HANDED RUNNING TOOL DOWN
THROUGH DUTCH RISER. MAKEUP TO
BLANKING PLUG IN TUBING HANGER WITH 10
TURNSTOLEFT. ROTATE ADDITIONAL 7.5
TURNS TO BACKOUT T' TC -II XO. RETRIEVE
BLANKING PLUG AND XO TO SURFACE
THROUGH DUTCH RISER.
- MAKEUP LUBRICATOR AND TEST QUICK
TEST SUB
- PULL BPV(NO TRAPPED PRESSURE FOUND
BELOW BPi
- RDMO VALVE SHOP LUBRICATOR CREW.
DECOMP
DISPLACE DIESEL FREEZE PROTECT OUT OF
WELLAS FOLLOWS.
- LINE UP TO CIRCULATE DOWN TUBING
THROUGH THE JET CUT AT 2962'MD. TAKE
RETURNS OUT IA THROUGH CHOKE SKID TO
FLOWBACK TANK (SHALLOW CUT ALLOWS
FOR SINGLE DIRECTION LONG WAY
CIRCULATION).
- PUMP 125 BBLS OF 120-F 6.5 PPG
SEAWATER; 315 GPM, 750 PSI PUMP
PRESSURE, 150 PSI PRESSURE
DOWNSTREAM OF CHOKE
- SHUT DOWN PUMPS FOR 1:15 AND ALLOW
SEAWATER IN TUBING AND IA TO SWAP WITH
23 BBLS DIESEL IN TUBING BELOW CUT & 31
BBLS DIESEL IN IA BELOW CUT
-PUMP SURFACE TO SURFACE 2058BLS; 315
GPM, FCP = 950 PSI, 150 PSI PRESSURE
DOWNSTREAM OF CHOKE
- NOTE: OA PRESSURE BUILT TO 950 PSI
DURING FIRST 125 BBLS OF CIRCULATING.
BLEED PRESSURE DOWN TO 400 PSI.
PRESSURE BUILDS AGAIN TO 950 PSI
DURING 205 BBLS OF CIRCULATING. BLEED
AGAIN TO 325 PSI.
- DUMP ALL FLUID DURING CIRCULATING AND
SEND TO HYDROCARBON RECYCLE
- SIMOPS: RIG UP DOYON CASING TUBING
HANDLING EQUIPMENT, PICKUP -10 STANDS
OF 5" DRILLPIPE
DECOMP
PULLTUBING HANGER TO RIG FLOOR
- CAMERON REP ON LOCATION TO BACKOUT
LOCKDOWN SCREWS
- UNSEAT HANGER WITH 77 KLBS
- PULL THROUGH STACK TO RIG FLOOR WITH
68 KLBS (EXPECTED = 68 KLBS)
-CAMERON REP INSPECTS HANGER FOR
RE-USEAND CONFIRMS CONDITION IS
ACCEPTABLE
- LAYDOWN HANGER.
Printed 8le/2017 11.19:44AM •AII depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: J-28
Rig Release: 7/15/2017
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/16/2017
Project: Prudhoe Bay
Site: PB -j Patl
Rig Name/No.: PARKER 272
(USM
Spud DatafTme: 5/17
Rig Contractor: PARKER DRILLING CO.
DECOMP CIRCULATE HOLE CLEAN WITH SOAP PILL
Active datum: J-28AActual @85.87us8 (above Mean Sea Level)
Date From - To
21:00 - 22:00
Hrs Task Code
(hr)
1.00 i RIGU I P II
22:00 - 00:00 r 2.00 1 RIGU P
6/20/2017 00.00 - 01.30 1 50 RIGU P
01'.30 - 0400 2.50 RIGU P
End Date: 7/8/2017
AFE No
X3 -0184N -C: (8,648,145.00)
Page 5 of 47
1987 12:00:OOAM
Rig Release: 7/15/2017
BPUOI: USA00000397
NPT Total Depth
Phase Description of Operations
(USM
_-
2,989.00
DECOMP CIRCULATE HOLE CLEAN WITH SOAP PILL
SURFACE TO SURFACE
- 630 GPM, 750 PSI
- FLOWCHECK WELL FOR 10 MIN AT END OF
CIRCULATING (STATIC)
2,989.00
DECOMP LAYDOWN 4-1/2", 12.6#, 13CR, VAMTOP
PRODUCTION TUBING FROM JET CUTAT
2962' ELMD (2989' MD P272 CORRECTED
DEPTH, 27' SHIFT) TO 1302' MDAT MIDNIGHT.
- APPLY JET LUBE SEAL GUARD AND THREAD
PROTECTORS TO ALL JOINTS TO SAVE FOR
USE AS CONDITION B KILL STRING AT LATER
DATE.
- 200 FPM PULLING SPEED, AVERAGE 35
JOINTS PER HOUR
- TUBING CONDITION = GOOD
SIMOPS: BUILD 5 STANDS OF 5" HWDP _
2,988.21
DECOMP LAYDOWN 4-1/2",12.6111, 13CR, VAMTOP
PRODUCTION TUBING FROM 1302' MD AT
MIDNIGHT TO SURFACE.
- LAY DOWN TUBING AS PLANNED OFF OLD
RUN TALLY:
- TOTAL OF 68 FULL JOINTS
- (3) SPACEOUT PUP JOINTS
-(1) X NIPPLE ASSEMBLY WITH HNADLING
PUPS
- (1) TUBING HANGER WITH T' X 4-1/7 XO
PUP
- CUT JOINT 39.42' WITH 5" OD FLARE,
GOODCUT
- SIMOPS: PICKUP 5" DRILLPIPE
- INSPECT ALL OLD COMPLETION
EQUIPMENT FOR NORM PRIOR TO IT
LEAVING LOCATION
- NO CLEANOUT RUN REQUIRED PRIOR TO
RUNNING WHIPSTOCK
2,988.21
DECOMP RIG DOWN TUBING HANDLING EQUIPMENT
AND PREPARE TO MAKE UPAND RUN SLB
WHIPSTOCK
- RIG DOWN DOYON CASING AND SEND
EQUIPMENT OUT
- SET 9-1/16" ID WEAR RING AND RUN IN 4
LOCK DOWN SCREWS
- LOAD AND PREPARE SLB TRACKMASTER
WHIPSTOCK AND MILLS
- RUN IN HOLE WITH 6-1/2" DRILL COLLARS,
PULL OUT OF HOLE AND RACK BACK (3)
STANDS
11:19:44AM 'All depths reported in Drillers Depths'
08:30 - 09:30
BOTTOM OF WINDOW = 2967' MD _
1.00 WHIP Pr 2.95221 WEXIT DISPLACE WELL FROM 8.5 PPG SEAWATER
TO 9.7 PPG LSND MILLING FLUID.
- 640 GPM, WITH 1530 PSI.
- PUMP HIGH VIS SPACER AHEAD OF MILLING
FLUID.
- OBTAIN SPR AT 2952'19.7 PPG IN/OUT
- MP #1: 30/40 SPM; 170/210 PSI
- MP #2: 30/40 SPM; 170/210 PSI
Printed a/6/2o17 11 "19:44AM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 6 of 47
Operation Summary Report
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/16/2017 Eno Date: 7/8/2017
X30184N-C: (8,648,145.00)
Project: Prudhoe Bay
I Site: PB J Pad
Rig NamdNo.: PARKER 272
Spud Date7Time: 5/17/1987 12:00 OOAM
Rig Release: 7/15/2017
Rig Contractor. PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-28AActual Q85.87usft (above Mean Sea Level)
Date From - To H.
Task I Code NPT Total Depth Phase
Description of Operations
(hr)
(usit)
04:00 - 05:30 1.50
WHIP P 2,988.21 WEXIT
MAKEUPAND RUN IN HOLE WITH SLB
TRI-MILLTRACKMASTER SINGLE RUN
WHIPSTOCK FROM SURFACE TO BHA
OVERALL LENGTH 119' MD
- MAKE UP WHIPSTOCK WITH 30 KLBS
SHEAR BOLT, VERIFIED BY WSL
- GYRODATAAND BAKER CONFIRM
ORIENTATION OF USED SUB.
- 6 KLB ROLL PIN AND 8 KLBS SCREW ON
WHIPSTOCKANCHOR
- RUN (3) STANDS DRILL COLLARS AND (10)
STANDS HWDP (MAX WEIGHT AVAILABLE TO
ENSURE SETTING CAPABILITY AT SHALLOW
DEPTH)
- SPERRY WIRELINE UNIT AND GYRODATA ON
LOCATION AS CONTINGENCY FOR
ORIENTING WHIPSTOCK.
0530 - 08:00 2.50
WHIP P 2,952.21 WEXIT
TRIP IN HOLE WITH WHIPSTOCK ASSEMBLY
FROM MILLS AT 119' MD TO TAG TUBING
STUB ON DEPTH AT 2989' MD (ON DEPTH
INCLUDING P272 27' RKB SHIFT FROM I
TUBING TALLY)
- REDUCED RUNNING SPEED OF RUN IN THE
HOLE AT 45 FPM DUE TO LOW SHEAR BOLT
RATING FOR SHALLOW WHIPSTOCK
- PU/SO WEIGHTS=144KLBSAT 2989' MD
- MONITOR DISPLACEMENT WITH THE TRIP
TANK
- RECORD SLOW PUMP RATES PRIOR TO
SETTING WHIPSTOCK
- NO ISSUES TRIPPING IN THROUGH CASED
HOLE.
08:00 - 08:30 0.50
WHIP P 2952.21 WEXIT
_
ORIENTAND SET WHIPSTOCK WITH MWD AT
700 ROHS PER DIRECTIONAL PLAN:
- HOLE INCLINATION= 40
- 515 GPM; 1150 PSI
- TAG TUBING STUBAT 2989' MD WITH 10K
DOWN, PU 13' SET ANCHOR AT 2974' MD, -3-
ABOVE 9-5/8" CASING COLLAR ON Mi LOG
RUN PRE-RIG
- SET DOWN 10K, PU TO UP WT. SET DOWN
20K, PU TO UP WT
- SLACK OFF AND SHEAR MILLS OFF
I
WHIPSTOCK WITH 27K PER SLB FISHING REP
TOP OF WINDOW = 2953' MD, 2952' TVD;
08:30 - 09:30
BOTTOM OF WINDOW = 2967' MD _
1.00 WHIP Pr 2.95221 WEXIT DISPLACE WELL FROM 8.5 PPG SEAWATER
TO 9.7 PPG LSND MILLING FLUID.
- 640 GPM, WITH 1530 PSI.
- PUMP HIGH VIS SPACER AHEAD OF MILLING
FLUID.
- OBTAIN SPR AT 2952'19.7 PPG IN/OUT
- MP #1: 30/40 SPM; 170/210 PSI
- MP #2: 30/40 SPM; 170/210 PSI
Printed a/6/2o17 11 "19:44AM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 7 of 47
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Data: 6/16/2017 End Date: 7/8/2017
X3 -0164N -C: (8,648,145.00 )
4Site:
Project: Prudhoe Bay
PB J Pad
Rig Name/No.: PARKER 272
Spud Date(Time: 5/17/1987 12:00:00AM
Rig Release: 7/15/2017
Rig Contractor. PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-28AActual @85.87usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth
__ _ _ _ WH
(hr) __ usft)_
:09:30 - 15:00 5.50 IP P 2,966.21
.01
Phase Description of Operations
WEXIT BEGIN J -28A WELLBORE AT 9:30 ON 6/20/17
MILL WINDOW IN 9-5/8" CASING PER SLB
FISHING REP FROM 2953' MD TO 2967' MD
- 400 GPM; 600-660 PSI, 80 RPM; 2-8/2-3
KFT-LBS TORQUE ON/OFF, 3-7 KLBS WOB
- PU/SO/ROT = 140/140/135 KLBS
- NO TORQUE SPIKES OR PICKUPS DURING
WINDOW.
- MW IN/OUT= 9.7 PPG
- NO CEMENT OBSERVED BEHIND CASING__
T MILL 8-1/2" INTERMEDIATE HOLE FROM 2967'
MD TO TO 2987' MD, 2986' TVD (20' FROM
BASE OF WINDOW TO MEET MINIMUM
AOGCC REQUIREMENTS)
- 400 GPM, 710 PSI ON, 640 PSI OFF, 80 RPM,
4/3 KFT-LBS TRQ OWOFF BTM, 1-3 KLBS WOB
- MW 9.7 PPG IN/OUT
- OBTAIN SPR AT 2987' MD PRIOR TO
TRIPPING
- OBSERVE SIGNS OF 8.4 PPG FRESH WATER
BELOW WHIPSTOCK SWAPPING WITH 9.7
PPG LSNDABOVE WHIPSTOCK MAINTAIN
CONSISTENT MW WITH BARITE.
WORK MILLS THROUGH WINDOW WITH AND
WITHOUT ROTATION AND WITH AND
WITHOUT PUMPS SEVERAL TIMES - NO
SIGNIFICANT DRAG NOTICED. WINDOW
LOOKS GOOD.
WEXIT CIRCULATE 1.5 BOTTOMS UP, ENSURE MUD
WEIGHT IN/OUT 9.7 PPG FOR LOT
- 650 GPM; 1600 PSI, 50 RPM; 3KFT-LBS
TORQUE
- RECIPROCATE 40' DURING CIRCULATION.
- PUMP 30 BBL HIGH VIS SWEEP FOR HOLE
CLEANING.
- OA PRESSURE INCREASED TO 950 PSI
DURING CIRCULATION, BLED TO 400 PSI.
BLED PRESSURE TO BLEED TRAILER.
- MONITOR WELL FOR 10 MIN AFTER
1900 - 1930 0.50 WHIP
P 2,986.21
Pnnted 8/8/2017 11:19:44AM 'All depths reported in Drillers Depths'
Commn Well Name: J-28
Event Type: RE -ENTER -
North America -ALASKA - SP
Operation Summary Report
Start Date: 6/16/2017 End Date: 7/8/2017
AFE No
(0,648,145.00)
Page 8 of 47
Rig Name/No.: PARKER 272 Spud DateMme: 5/17/1987 12:00:OOAM Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO. BPUOI. USA00000397
Active datum: J -28A Actual @85.87usft (above Mean Sea Level)
Date From -To Him Task Code NPT Total Depth Phase Description of Operations
(hr) (usft)
18:30 - 21:00 1.50 WHIP P 2,866.21 WEXIT PERFORM LOT TO 13.7 PPG EMW
I -SPACEOUT WITH MILLS INSIDE WINDOW
AND CLOSE ANNULAR PREVENTER
21:00 - 21:30 0.50 1 WHIP P
21:30 - 00:00 2.50 WHIP P
6/21/2017 100:00 - O1:30 1 1.50 1 STWHIP I P
01:30 - 02:30 1.00 1 BOPSUR P
02:30 - 04:00 1.50 DRILL P
11:19:44AM `All depths reported in Drillers Depths'
- MW = 9.7 PPG, 2952' TVD, 2953' MD
- PUMP 3 BELS TO 710 PSI AT 0.75 BPM
- PUMP AWAY 1 BBLAFTER BREAK OVER AT
620 PSI
1
- MONITOR PRESSURE STABILIZATION FOR
10 MIN (BLEEDS DOWN TO 400 PSI)
- BLEED OFF PRESSURE TO TRIP TANK 3
BBLS PUMPED, 2.8 BBL RETURNED
- MONITOR WELL FOR 15 MIN FOLLOWING
TEST AND PRIOR TO PULLING OUT OF THE
HOLE (STATIC)
- RECEIVE APPROVAL TO PROCEED FROM
ODE, SEE ATTACHED DOCUMENTATION.
- OBSERVE PRESSURE INCREASE ON OA
DURING TEST RELATED TO COMPRESSION
(NO PRESSURE TRANSMISSION OBSERVED
TO OA, I.E. OA PRESSURE INCREASES 70 PSI
TO 402 PSI WHILE WELLBORE LOT
PRESSURE IS -750 PSI).
j
- 13.7 PPG EMW EXCEEDS MINIMUM 12.3 PPG
LOT REQUIREMENT FOR 25 BBLS KT FOR
HOLE SECTION
2,988.21 WEXIT
RIG SERVICE
298621 WEXIT
PULL OUT OF THE HOLE ON ELEVATORS
WITH MILLING ASSEMBLY FROM 2953' MD TO
11 9'MD BHA AT MIDNIGHT.
- MONITOR DISPLACEMENT WITH THE TRIP
TANK
- MONITOR THE WELL FOR 10 MIN BEFORE
PULLING NON-SHEARABLES(STATIC)
- RACK BACK FIVE STANDS 5" HWDP.
LAYDOWN REMAINDER OF HWDP+ (9) 6-1/2"
DC
2,987.00 WEXIT
LAYDOWN B-1/2" SLB TRACKMASTER
WINDOW MILUNG ASSEMBLY FROM B14AAT
119' MD TO SURFACE.
-LOWER MILL - 1/4'UNDER
-MIDDLE MILL- 1/8" UNDER
_
- UPPER MILL- IN GUAGE.
2,98700 WEXIT
FLUSH STACKAFTER MILLING WINDOWAND
RETURN WELL CONTROL EQUIPMENT TO
NORMAL LINEUP _
2,987.00 INT1
MAKEUPAND RUN IN HOLE WITH 8-117
MOTOR DRILLING ASSEMBLY FROM
SURFACE TO BHA OVERALL LENGTH AT 825'
MD.
- 8-1/2" NEW HUGHES GX117 MILL TOOTH
ROLLER CONE BIT, SERIAL 65267109
- 6-3W' 1.30 BENT ULTRA X-TREME MUD
MOTOR, PORTED FLOAT,
DIR/GR/RES/PWDNSS, UBHO SUB (84' BACK
FROM BIT), JARS (670' BACK FROM BIT)
11:19:44AM `All depths reported in Drillers Depths'
Commn Well Name: J-28
Event Type: RE-ENTER- ONSHORE (RON)
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLING CO.
Active datum: J-28AActual @85.87usft (above
Date I From - To Hes
- 06:30 1 0.50
North America - ALASKA - BP
Operation Summary Report
Start Date: 6/16/2017 End Date: 7/8/2017
Site: PB J Patl —L
AFE No
X3 -0184N -C:(8,648,145.00)
Rig Release: 7/152017
Page 9 of 47
an Sea Level)
Task Code NPT Total Dept Phase Description of Operations
(usft)
DRILL
P
2,987.00 INTI TRIP IN HOLE WITH 8-12" MOTOR DRILLING
ASSEMBLY FROM BHAAT 825' MD TO TOP OF
WHIPSTOCK AT 2953' MD
- 200 FPM TRIPPING SPEED FROM WELL
PROGRAM
- BREAK CIRCULATION, FILL PIPE, AND
CONFIRM 9.7 PPG MW
- RECORD SLOW PUMP RATES WITH NEW
BHA
2,987.00 INT -I SLIP AND CUT 43'1-3/8" DRILL LINE, 8 WRAPS
_
DRILL
P
- CUT AT 1015 TON -MILES
-CALIBRATE BLOCKS WITH BAKER
06:30 - 08:00 1.50 DRILL P 2,987.00 INTI RUN GYRO SURVEY PER OCN #1 TO ORIENT
MUD MOTORAND CONFIRM ORIENTATION OF
WHIPSTOCKSLIDE
- ORIENT MUD MOTOR IN CASING PRIOR TO
OPEN HOLE AND AGAIN WITH BIT ON
BOTTOMAT2987'MD
- NO PRESSURE CONTROL EQUIPMENT. RUN
INTEGRALLINE WIPER/CUTTER _
08:00 - 12:00 4.00 DRILL P 3,188.00 INTI DIRECTIONAL DRILL 8-12"INTI BUILD
SECTION FROM 2953'TO3188'MD,
(3185 -TVD) (235' IN 4 HRS = 59 FPH WITH
CONNECTIONS)
- INSTANTANEOUS ROP= 80-150 FPH
- 500 GPM; 1125 PSI ON, 1090 PSI OFF
- 40 RPM WITH 3K TO ON/OFF. - 12-14 K WOB
- AST -.7, ART- 1.0
- PU-130K , SO -120K, ROT -119K
- MUD WEIGHT IN/OUT 9.7 PPG
- SURVEY EVERY 100' FOR DOGLEGS <
5'/100'
- BACK REAM ZERO FEET PRIOR TO
CONNECTION
- SOFTSPEED ACTIVE FOR MOST OF
DRILLING INTERVAL
-GAS WATCH: AVERAGE BACKGROUND=
0-43 UNITS, MAXIMUM =43 UNITS
- PER OCN #1, TAKE GYRO SURVEY AFTER
FIRST TWO STANDS DRILLED DOWN TO
CONFIRM AZIMUTH TREND AND BHA WALK
TENDENCY.
- OBTAIN SPR AT 2914' MD 2914 TVD , 9.7 PPG
N/OUT
- MP #1: 30/40 SPM; 210/250 PSI
- MP #2: 30140 SPM; 200/250 PSI
Printed 8/6/2017
11.19.44AM 'All depths reported in Drillers Depths'
Printed 8/8/2017 11:19:44AM •All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 10 of 47
Operation Summary Report
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/16/2017 End Date: 7/8/2017
X3-0184N-C: (8,648,145.00)
Pmject: Pmdhoe Bay
Site: PB J Pad
Rig Name/No.: PARKER 272
Spud DateRms: 5/17/1987 12:00 OOAM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-28AActual @85.87usft (above Mean Sea Levey
Date From -To Hrs
Task Coda NPT Total Depth Phase
Description of Operations
_ (hp_
112:00 - 19:30 7.50
DRILL P 3,800.00 INTI
DIRECTIONALLY DRILL 13-1/2"INTERMEDIATE
HOLE BUILD SECTION FROM 3188' MD TO
3800' MD BHA TRIP DEPTH, (3738-TVD) (612'
IN 7.5 HRS = 81.6 FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP =80-150 FPH
- 600 GPM; 1610 PSI ON, 1470 PSI OFF
- 40 RPM WITH 3K TO ON/OFF. -12-14 K WOB
- TOTAL DRILLING TIME SLIDE TIME-3.3 HRS
ROTATE TIME- 3.2 HRS
- PU-130K , SO-120K, ROT-119K
MUD WEIGHT WOUT 9.7 PPG
- SURVEY EVERY 100' FOR DOGLEGS <
5"/100'
- SLIDE 30'45' PER STAND TO ACHIEVE 34
DEG DLS.
- BACK REAM 30 FEET PRIOR TO
CONNECTION
- SOFTSPEED ACTIVE FOR MOST OF
DRILLING INTERVAL
- GAS WATCH: AVERAGE BACKGROUND =
043 UNITS, MAXIMUM = 43 UNITS
- DRILLED TO DIRECTIONAL PLAN WP08, AND
OCN #1 FOR GYRO SURVEY REQUIREMENTS.
- HIGH VIS SWEEP AT 3800' MD - 0 %
INCREASE
- CLEAN MWD SURVEYS OBSERVED AT 3226'
MD'
- NO LOSSES WHILE DRILLING.
- OBTAIN SPRAT 3286' MO 3273 TVD, 9.7 PPG
IN/OUT
- MP #1: 30/40 SPM; 160 / 210 PSI
_
- MP #2: 30/40 SPM; 1601210 PSI _
19:30 - 20:30 1.00
DRILL PT 3,800.00 INTI
CIRCULATE BOTTOMS UP X2
- 600 GPM, 1525 PSI, RECIPROCATE 45' WITH
40 RPM & 3K TQ
- PUMP 35 BBL HIGH VIS SWEEP AT 3557' MD -
NO INCREASE IN CUTTINGS AT BOTTOMS UP.
-MW 9.7 PPG IN/OUT
20:30 - 22:30 2.00
DRILL P 3,80000 INTI
_
RUN FINAL GYRO SURVEYS ON ELINETO
VERIFY AZIMUTH TREND FOR NEXT HOLE
SECTION.
- RACK BACK ONE STAND AND PICK UPA
SINGLE WITH A 15' PUP FOR CORRECT
SPACE OUT.
- SURVEYS TAKEN PER THE DDAND GYRO
DATA TO ENSURE 100' OF OVERLAP PAST
AREA OF BAD SURVEYS AND 30' SURVEYS
OVER >5 DEG DLS INTERVALS
22:30 - 23:00 0.50
DRILL P 3,800.00 INTI
RIG SERVICE
- GREASE WASH PIPE
- GREASE BLOCKS AND CHECK GEAR & HYD
T
OIL
23:0000 - 00:001 001 00
DRILL P 3.80000 INTI
PLANNED TRIP OUT OF THE HOLE FOR BHA
- POOH ON ELEVATORS WITH THE 8-1/2"
MOTOR BHA FROM 3800' MD TO BHA AT 824'
MD
- MONITOR WELL PRIOR TO PULLING OFF
BOTTOM- STATIC
- MONITOR WELL VIA TRIP TANK (PROPER
j
DISPLACEMENT)
- PULLING SPEED = 60 FPM
- NO ISSUES PULLING OFF BOTTOM.
Printed 8/8/2017 11:19:44AM •All depths reported in Drillers Depths'
Common Well Name: J-2
Event Type: RE -ENTER -
Project: Prudhoe Bay
North America - ALASKA - BP
Operation Summary Report
Start Date: 6/16/2017
End Date: 7/8/2017
AFE No
(8,648,145.00)
Page 11 of 47
Kig NaMNO.: YAKKER 272
Spud Daternme: 5/17/1987 12:00:OOAM
Rig Release: 7/15/2017
Rig Contractor. PARKER DRILLING CO.
BPUOI: USA00000397
_
Active datum: J-28AACtual @85.87usR (above Mean Sea Level)
Date From -To Him
Task Code NPT
Total Depth
Phase
Description of Operations
6/22/2017 00:00 - 01:30 1.50
DRILL
P
3,800.00
INT1
LAY DOWN 8-1/2" DRILLING ASSEMBLY FROM
824' MD TO SURFACE
- FLOW CHECK WELL FOR 10 MIN PRIOR TO
PULLING NOWSHEARABLES THROUGH
STACK- STATIC
-BITGRADED1-I-NO-A-E-I-NO-BHA
(IN GAUGE),
- NO ISSUES WITH BHA
- MONITOR WELL ON TRIP TANK.
01:30 - 02:00 0.50
DRILL
P
3,800.00
INTI
CLEAR AND CLEAN RIG FLOOR
- LOAD NEXT BHA TO RIG FLOOR.
- LAY OUT TOOLS IN PIPE SHED_
102:00 - 05:00 3.00
DRILL
P
3,800.00
INTI
MAKEUPAND RUN IN HOLE WITH 8-117X
9-7/8" RSS DRILLING ASSEMBLY#3 PER
BAKER DO FROM SURFACE TO BHA
j
OVERALL LENGTH AT 595'MD.
- 8-117 NEW HYCALOG 616-JID PDC BIT,
AUTO TRACW ZONE TRACK AT BIT GAMMA,
COPILOT, ON TRACK LWD/MWD,
(GR/RES/PWDNSS/DIR)
- 9-7/8" NOV ANDERREAMER UNDER REAMER
164' BACK FROM BIT, JARS (346' BACK FROM
BIT)
- SHALLOW HOLE TEST MWD AT -630' - ALL
FUNCTIONS NORMAL.
- MONITOR WELL ON TRIP TANK FOR
CORRECT DISPLACEMENT.
- NOV REP ON RIG FLOOR FOR VERIFICATION
OF NOV TOOL PLACEMENTAND SET UP.
0500 - 06.00 1.00
DRILL P
3,800.00
INTI
RUN IN HOLE WITH B -1/2"X9-7/8" RSS
DRILLING ASSEMBLY #3 FROM 595' MD TO
2953' MD
- RIH ON ELEVATORS TO THE 9-5/8" CASING
- PU-110 K, SO -100K, AT 2900' MD
�- MONITOR TRIP ON TRIP TANK
Pnnted 8/8/2017
11:19:44AM •AII depths reported in Drillers Depths*
Common Well Name: J-28
Event Type: RE-ENTER- ONSHORE (RON)
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLING CO.
Active datum: J-28AActual @85.87usft (abovr
Date I From - To Him
North America - ALASKA - BP Page 12 of 47
Operation Summary Report
Start Date: 6/16/2017 End Date:
Spud Data/Time:
Task ' Code I NPT ! Total
0930
- 1000
050
DRILL
P
3,800.00
1090
- 11'.00
1 00
DRILL
P
3,810 00
Art NO
X3 -0184N -C:(8,648,145.00)
BPUOI: USA00000397
Phase Description of Operations
INT1 RUN IN HOLE WITH -8-117'X 9-7/8" RSS
DRILLING ASSEMBLY #3 FROM WINDOW AT
2953' MD TO PREVIOUSLY DRILLED MD OF
3800' MD.
- NO ISSUES WITH BIT PASSING THRU THE
WINDOW.
- TROUBLE WORKING FINAL (2) 8-3/8"
STABILIZERSAND UNDER REAMER
THROUGH THE WINDOW WITH BIT DEPTH AT
3125' MD. ROTATE STRING 3/4 TURN AND
USE 10K DOWN TO WORK THROUGH.
- RUN -2.5 MORE STANDS TO BIT DEPTH OF
3389' MD (ALL BHA EXCEPT HWDP BELOW
WINDOW] AND SET DOWN HARD WITH 45K
DOWN. UNSUCCESSFULLY ATTEMPT TO
WASH THRU WITH 2 BPM AND FULL500 GPM
NO PRESSURE RESPONSE WITH TAGGING
UP). UNSUCCESSFULLY ATTEMPT TO REAM
THROUGH WITH 5-10 RPM. TAG HARD AND
REQUIRE (3) JAR UP HITS WITH 40K OVER TO
GET FREE.
- WASH AND REAM DOWN AS NEEDED OVER
SEVERAL MORE INTERVALS W/500 GPM,
1390 PSI, 80 RPM, 2-3 K TO, 2-3 K WOB,
300-600 FPH SPEED. NO PACK OFFS AND NO
DHWOB OBSERVED WHEN STACKING OUT
ON HARD SPOTS, SUGGESTING ISSUE
RELATED TO STIFF BHA THROUGH BUILD
SECTION.
- TAG BOTTOM WITH NO FILL.
- OBTAIN SPR AT 3800' MD, 3735' TVD, 9.7 PPG
IN/OUT
- MP #1: 30/40 SPM, 1701240 PSI
_ - MP #2: 30/40 SPM: 170/240 PSI
INTI PRODUCTIVE TIME SPLIT OUT FROM
PREVIOUS TIME ENTRY FOR TIME IT SHOULD
HAVE TAKEN TO TRIP IN THE HOLE WITH THE
8-1/2" RSS DRILLING ASSEMBLY FROM 2953'
MD TO 3800' MD ON ELEVATORS.
INTI OPEN THE NOVANDERREAMER
UNDERREAMER PER NOV REP
- DRILL STAND DOWN 10' MD FROM 3800' MD
TO 3810' MD TO PLACE TOOL JOINT AT RIG
FLOOR.
- OPEN THE NOV UNDER REAMER BLADES AT
3810' MD BIT DEPTH, 3635' MD REAMER
DEPTH PER NOV REP.
- PUMP DOWN 1-3/8" STEEL BALLAT 350 GPM
,750 PSI. OBSERVE 50 PSI DROP WHEN BALL
LANDS.
- REAM T THEN CONFIRM BLADES OPEN
WITH 15K OVERPULLAGAINST STARTING
DEPTH. MWD TURBINE SPEEDS DROP FROM
3550 TO 3280 & PUMP PRESSURE DROPS
FROM 1860 TO 1740 PSI WITH BLADES OPEN.
Printed 8/8/2017 11:19:"AM *All depths reported in Drillers Depths*
North America -ALASKA - BP
Operation Summary Report
Page 13 of 47
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/16/2017 Eno Date: 7/8/2017
X3-0184kli (8,648,145.00)
Project: Prutlhoe Bay
Site: PB J Pad
Rig Name/No.: PARKER 272
Spud Date/Time: 5/17/1987 12,00:OOAM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J -28A Actual @85.87usft (above Mean Sea Level)
Date From -To Him
Task Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
11:00 - 13:00 2.00
DRILL P 3,954.00 INTI
DIRECTIONAL GRILL B-1/2" X 9-7/8" INT HOLE
SECTION FROM 3810" MD TO 3954' MD (144'
IN 2.0 HRS = 72 FPH WITH CONNECTIONS)
-INSTANTANEOUS ROP= 150-200 FPH
- 750 GPM, 2500-2560 PSI ON BOTTOM, 80-150
RPM, 4 / 3 TRO ON/OFF BTM, 10-12 KLBS
WOB
- MW IN/OUT= 9.7 PPG
-ECD ACTUAL- 10.67 PPG, CALCULATED
CLEAN HOLE 10.4 PPG
- SURVEY EVERY 90' FOR MULTI -STATION
CORRECTION
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- DRILLING ON DIRECTIONAL PLAN WITH NO
_
ISSUES _
13:00 - 16:00 3.00
DRILL N 3,954.00 �.. INT1
MUD PUMP MAINTENANCE
- CHANGE OUT WASHED VALVE AND SEAT ON
MP#2.
- 375 GPM, 775 PSI, RECIPROCATING PIPE 40'
STROKES WHILE CHANGING OUT VALVE AND
SEAT. INSPECT VALVES AND SEATS ON MP
#1.
16:00 - 00:00 8.00
DRILL P 4,760.00 INTI
DIRECTIONAL DRILL B -1/2"X 9-7/8" INTHOLE
SECTION FROM 3954' MD TO4760' MD, 4380'
TVD (806'N 8 HRS = 101 FPH WITH
CONNECTIONS)
- INSTANTANEOUS ROP = 150-200 FPH
- 750 GPM, 2710 ON, 2680 PSI OFF, 100-150
RPM, To ON/OFF 4/3 KFT-LBS
- MW IN/OUT = 9.7 PPG
-ECD ACTUAL- 10.6 PPG, CALC 10.44 PPG
EMW.
- SURVEY EVERY 90' FOR MULTI -STATION
CORRECTION
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEEDACTIVE FOR ENTIRE DRILLING
INTERVAL
- DRILLING ON DIRECTIONAL PLAN WITH NO
ISSUES
- ACTUAL DRILLING TIME FOR 24 HOUR
PERIOD =7.9 HOURS
- GAS WATCH: AVERAGE BACKGROUND =
0-80 UNITS, MAXIMUM =-200 UNITS
PUMPED SWEEPS AS FOLLOWS:
- 3980' MD: 35 BBL DRILLAND SLIDE
PREVENTATIVE BIT BALLING SWEEP.
4290'MD: BBL WEIGHTED, 50%
I
INCREASESE IN CUTTINGS.
11'19'44AM •AII depths reported in Drillers Depths'
Name: J-28
Active tlatum: J -28A X85
Data
From 823/2017 -00:00 - 06:1
North America - ALASKA - BP
Operation Summary Report
Start Date: 6/182017 End Date: 7/8/2017
Site: PB J Pad
Spud DateTme: 5/17/1987 12:00:00AM
Hm I Task
Code NPT Total Depth Phase
(usft)
P 5,400.00 INT1
06:00 - 12.00 6.00 DRILL P
5,957.00 INTI
Printed 8/8/2017 11:19:44AM `All depths reported in Drillers Depths`
Pape 14 of 47
AFE No
X3 -0184N-0:(8,648,145.00)
BPUOI: USA00000397
DIRECTIONAL DRILL 8-1/2"X9-7/8" INT HOLE
SECTION FROM 4760' MD, TO 5400' MO (64V
IN 6 HRS = 107 FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP= 150-200 FPH
- 750 GPM, 2710 ON, 2680 PSI OFF, 150 RPM,
TO OWOFF, 6/4 K FT -LB
- MW IN/OUT = 9.7 PPG
-ECD ACTUAL- 10.78 PPG, CALCULATED
CLEAN HOLE 10.5 PPG
- SURVEY EVERY 90' FOR MULTI -STATION
CORRECTION
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- DRILLING ON DIRECTIONAL PLAN WITH NO
ISSUES-
- GAS WATCH: AVERAGE BACKGROUND=
80-200 UNITS, MAXIMUM= -3300 UNITS
- AT -4870' MD DRILLED COAL SEAM AT BASE
OF UGNU 4 MD OBSERVED GAS WATCH
SPIKE TO 3300 UNITS. ZERO % LEL ON RIG
GAS DETECTION SYSTEM. VERIFIED
PRESSURIZED VS NON -PRESSURIZED MUD
WEIGHTS TO BE SAME AT 9.7 PPG. GEOLOGY
ATTRIBUTED DRILLED COAL SEAM FOR GAS
AT BOTTOMS UP. OBSERVED RAPID FALL
OFF GAS ON GAS WATCH.
PUMPED SWEEPS AS FOLLOWS:
- 4850' MD : 35 BBL TANDEM LOW VIS /
WEIGHTED, 50% INCREASE IN CUTTINGS
DIRECTIONAL DRILL 8=11Z'X 9-7/8" INT HOLE
FROM 5400' MD TO 5957' MD IN UG3
FORMATION (55T IN 6 HRS = 93 FPH WITH
CONNECTIONS).
- INSTANTANEOUS ROP = 150 FPH
- 750 GPM, 3050 PSI ON/OFF BOTTOM, 150
RPM, TRQ ON/OFF BTM = 8/6 KFT-LBS, WOB =
10-12 KLBS
-MW IWOUT=9.7
- ECD CALC CLEANHOLE = 10.5 PPG EMW,
ACTUAL= 10.9 PPG EMW, HARDLINE= 11.5
PPG EMW
- LOSSES =0
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GAS WATCH: BACKGROUND =-100 UNITS,
MAX = 373 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTIONS
-CO-PILOT/ UNDERREAMER NOTES: NO
ISSUES NOTED
PUMPED SWEEPS AS FOLLOWS:
- 5332' MD: 35 BBL WEIGHTED SWEEP 75%
INCREASE IN CUTTINGS.
- 5613' MD : 35 BBL WEIGHTED, 45%
Common Well Name: J-28
Event Type: RE-ENTER- ONSHORE(RON)
Project: Prudhoe Bay
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLING CO.
Active datum: J-28AActual 085.87usR (above
Date From -To Him
(hr)
12:00 - 18:00 S.00
1800 - 0000 6.00
North America - ALASKA - BP Page 15 of 47
Operation Summary Report
Start Date: 6/16/2017 End Date: 7/8/2017
Site: PB J -Pa -d-
Spud DateTme: 5/17/1987 12:00:OOAM
Task Code NPT Total Depth Phase
(usft)
TRILL P 6,560.00 INTI
Printed 8/8/2017 11.19:44AM 'All depths reported in Drillers Depths'
AFE No
X3 -0184N -C: (8,648,145.00 )
BPUOI: USA00000397
De=Iption of Operations
DIRECTIONAL DRILL 8-1/2" X 9-7/8" INT HOLE
FROM 5957' MD TO 6560' MD IN UG3 8 UG1
FORMATIONS (523' IN 6 HRS = 87 FPH WITH
CONNECTIONS).
- INSTANTANEOUS ROP = 120-150 FPH
- 750 GPM, 3215/ 3195 PSI ON/OFF BOTTOM,
150 RPM, TRQ ON/OFF BTM = 8/6 KFT-LBS,
WOB =10-12 KLBS
- MW IN/OUT = 9.7
- ECD CALC CLEANHOLE = 10.45 PPG EMW,
ACTUAL= 10.75 PPG EMW, HARDLINE = 11.5
PPG EMW
- LOSSES = 0
- SOFTSPEEDACTIVE FOR ENTIRE DRILLING
INTERVAL
MGAS WATCH: BACKGROUND = 40 UNITS,
AX = 82 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTIONS
PUMPED SWEEPS AS FOLLOWS:
- 6086' MD: 35 BBL WEIGHTED SWEEP 5%
INCREASE IN CUTTINGS.
- 6560' MD : 35 BBL WEIGHTED, 50%
INCREASE IN CUTTINGS.
- SPRS TAKEN AT 5991' MD , 5007' TVD
DIRECTIONAL DRILL 8-10 X 9-7/8" INT HOLE
FROM 6560' MD TO 7033' (5561' TVD) MD IN
UG1 8 WS2 FORMATIONS (473' IN 6 HRS = 79
FPH WITH CONNECTIONS).
- INSTANTANEOUS ROP =150 FPH
- 750 GPM, 3320/3318 PSI ON/OFF BOTTOM,
150 RPM, TRO ON/OFF BTM = 10/8 KFT-LBS,
WOB = 10-12 KLBS
- PU-187K, SO -135K, ROT -136K
-MW IN/OUT = 9.7 / 9.7+
- ECD CALC CLEAN HOLE =10.55 PPG EMW,
ACTUAL= 11.07 PPG EMW, HARD LINE = 11.5
PPG EMW
-LOSSES=ZERO
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GAS WATCH: BACKGROUND = 42 UNITS,
MAX = 164 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTIONS
- CO-PILOT / UNDERREAMER NOTES:
NOTHING OUT OF THE ORDINARY. NO
EXCESSIVE VIBRATIONS OR INCONSISTENT
TORQUES OR DHWOB ISSUES
- ACTUAL DRILLING HOURS FOR PAST 24
HOUR REPORTING PERIOD =18.1 HRS, 75%
- DIRECTIONAUGEO/N1UD NOTES FOR THE
DAY: DIRECTIONAL DRILLING ON PLAN
HOLDING TANGENT AT 58° UNTIL -7400' MD.
- SPRS TAKEN AT 6936' MD , 5510' TVD
11:19:44AM 'All depths reported in Drillers Depths*
North America -ALASKA - BP
Page 16 of 47
Operation Summary Report
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/16/2017 End Date: 7/8/2017
X3 -0184N -C: (8,848,145.00)
Project: Prudhoe Bay _
Site: PB J Pad
Rig Name/No.: PARKER 272
Spud DateTme: 5/17/1987 12:00:00AM
Rig Release: 7/15/2017
Rig Contractor. PARKER DRILLING CO.
BPUOL USA00000397
Active datum: J-28AAclual @85.87usft (above Mean Sea Level)
Date
From- To Hrs
TaskCode. NPT
Total Depth
Phase
Description of Operations
(hr)
100:00
(usft)
6/24/2017 - 08:00 6.00
DRILL P 7,625.00 INTI
DIRECTIONAL DRILL &1/2"X9-7/8"INT HOLE
FROM 7033' MD TO 7625' MD IN WS1 & CM3
I
FORMATIONS (592' IN 6 HRS = 99 FPH WITH
I
CONNECTIONS).
- INSTANTANEOUS ROP = 150 FPH
- 750 GPM, 3480 PSI ON/OFF BOTTOM, 150
RPM, TRO ON/OFF BTM = 10/8 KFT-LBS, WOB
=8-12 KLBS
-MW IN/OUT=9.7
- ECD CALC CLEANHOLE = 10.45 PPG EMW,
ACTUAL =11.12 PPG EMW, HARDLINE = 11.5
PPG EMW
- LOSSES = ZERO
- SOFTSPEEDACTIVE FOR ENTIRE DRILLING
INTERVAL
- GAS WATCH: BACKGROUND = 80 UNITS,
MAX =290 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTIONS
PUMPED SWEEPS AS FOLLOWS:
- 7064' MD: 35 BBL WEIGHTED SWEEP 25%
INCREASE IN CUTTINGS.
- 7600' MD 35 BBLTANDEM LOW VIS /
WEIGHTED SWEEP NO INCREASE IN
CUTTINGS.
- PLANNED WEIGHT UP STARTED AT
-7450'MD. WEIGHT UP FROM 9.7 PPG TO 10.1
PER THE WELL PROGRAM. WEIGHT UP
USING DONE USING 290 BBLS OF 12 PPG
12:00 8.00
DRILL P 7,925.00 INTI
SPIKE FLUID.
DIRECTIONAL DRILL 8-1/2" X 9-7/8" INTHOLE
FROM 7625' MD TO 7925' MD IN CM2 & CM1
FORMATIONS (300' IN 6 HRS = 50 FPH WITH
CONNECTIONS).
- INSTANTANEOUS ROP = 80-100 FPH
- 725 GPM, 3700 PSI ON/OFF BOTTOM, 150
RPM, TRO ON/OFF BTM = 10/9 KFT-LBS, WOB
= 10.12 KLBS
-MW IN/OUT =10.1
ECD CALC CLEANHOLE =10.75 PPG EMW,
ACTUAL= 11.45 PPG EMW, HARDLINE =11.5
PPG EMW, MAX OBSERVED DURING
li
DRILLING = 11.66 PPG
- LOSSES = ZERO
- SOFTSPEEDACTIVE FOR ENTIRE DRILLING
INTERVAL
- GAS WATCH: BACKGROUND =150 UNITS,
MAX = 335 UNITS
- NO BACKREAMING AT CONNECTIONS.
'.
SURVEY EACH CONNECTIONS
- CO-PILOT / UNDERREAMER NOT: NO
ISSUES
11:19:44AM 'All depths reported in Drillers Depths*
Common Well Name: J-28
Event Type: RE-ENTER- ONSHORE(RON)
Active datum: J -28A Actual
Date 1 From - To His
North America -ALASKA - BP
Operation Summary Report
Start Date: 6/162017 End Date: 7/8/2017
Spud Daternme: 5/17/1987 12:00:OOAM
Task Code I NPT Total Depth Phase
Page 17 of 47
AFE No
X3 -0184N -C: (8,648,145.00 )
Rig Release: 7/152017
BPUOI: USA00000397
Description of Operations
DIRECTIONAL DRILL 8-1/2"X 9-7/8" INT HOLE
FROM 7925' MD TO 8390' MD IN CM2
FORMATION (485' IN 6 HRS = 78 FPH WITH
CONNECTIONS).
- INSTANTANEOUS ROP= 100.150 FPH
- 725 GPM, 3620 PSI ON/OFF BOTTOM, 150
RPM, TRO ON/OFF BTM = 12/10 KFT-LBS,
WOB = 9-13 KLBS
MW IN/OUT =10.1
- ECD CALC CLEANHOLE =10.75 PPG EMI,
ACTUAL= 11.36 PPG EMW, HARDLINE = 11.5
PPG EMW
-LOSSES=ZERO
- SOFTSPEEDACTIVE FOR ENTIRE DRILLING
INTERVAL
-GAS WATCH: BACKGROUND = 200 UNITS,
MAX = 365 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTIONS
-CO-PILOT/ UNDERREAMER NOTES: NO
ISSUES WITH UNDERREAMER
- 8074' MD 35 BBLHIGH VIS SWEEP 50%
,625.00 INTI DIRECTIONAL DRILL 8-1/2" X 9-7/8" INT HOLE
FROM 8390' MD TO 8625' MD IN CM2 8 CMI
FORMATIONS (235' IN 6 HRS = 40 FPH WITH
CONNECTIONS).
-INSTANTANEOUS ROP =80 FPH
- 700 GPM, 3450 PSI ONIOFF BOTTOM, 150
RPM, TRO ON/OFF BTM = 13/10 KFT-LBS,
WOB = 9-130 KLBS
- MW IN/OUT = 10.2
- ECD CALC CLEANHOLE =10.85 PPG EMW,
ACTUAL= 11.39 PPG EMW, HARDLINE = 11.5
PPG EMW
- WEIGHT UP FROM 10.1 PPG TO 10.3 PPG
WITH BLACK PRODUCTS. USE 10.8 PPG
SPIKE FLUID FROM THE MUD PLANT.
TRICKLE IN OVER 4 FULL CIRCULATIONS,
REDUCED PUMP RATE FROM 725 GPM TO 700
GPM TO HELP REDUCE ECD.
- LOSSES = ZERO
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GAS WATCH: BACKGROUND = 200 UNITS,
MAX = 750 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTIONS
- CO-PILOT / UNDERREAMER NOTES: NO
ISSUES WITH
- ACTUAL DRILLING HOURS FOR PAST 24
HOUR REPORTING PERIOD =19.8 HRS, 82.5%
- DIRECTIONALIGEO/MUD NOTES FOR THE
DAY: DROP AND TURN DRILLING ACCORDING
TO DIRECTIONAL PLAN, 8' LEFT OF LINE, 1'
HIGH. TOP OF CM1 CAME IN AT 8577'MO. 76'
HIGH OF PLAN.
Printed 8/8/2017 11:19:44AM *All depths reported in Drillers Depths*
North America - ALASKA - BP
Operation Summary Report
Page 18 of 47
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/16/2017 End Date: 7/8/2017
X3 -0184N -C: (8,648,145.00)
Project: Prudhoe Bay
Site: PB J Pad
Rig Name/No.: PARKER 272
Spud Date/Time: 5/17/1987 12:00:OOAM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-28AActual (!D85.87usft (above Mean Sea Lev
Date From - To Him Task
_ (hr)._.._
6/25/2017 00:00 08:00 6.00 DRILL
Code NPT Total Depth Phase
P 8,83 00 INTI
Primed 8/8/2017 11:19:44AM 'All depths reported in Drillers Depths`
Description of Operations
FROM 8625' MD TO 8838' MD IN CM2 & CM1
FORMATIONS (213' IN 6 HRS = 36 FPH WITH
CONNECTIONS).
- INSTANTANEOUS ROP = 50-80 FPH, LIMITED
FOR ECD
- 700 GPM, 3340 PSI ON/OFF BOTTOM, 150
RPM, TRO ON/OFF BTM = 13/10 KFT-LBS,
WOB = 5-12 KLBS
- MW IN/OUT=10.2- PPG, NO LOSSES
- ECD CALC CLEANHOLE =10.85 PPG EMW,
ACTUAL= 10.80 PPG EMW, HARDLINE = 11.34
PPG EMW
- SOFTSPEEDACTIVE FOR ENTIRE DRILLING
INTERVAL
- GAS WATCH: BACKGROUND =150 UNITS,
MAX = 200 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTION
- 8738' MD 35 BBLHIGH VIS SWEEP 20%
INCREASE IN CUTTINGS.
- CO-PILOT / UNDERREAMER NOTES: FROM
-8647' MD TO -8735' MD OBSERVED HIGH
LEVELS OFWHIRLAT7 AND STICK SLIPAT6.
STOPPED ROTARY AND PU OFF BOTTOM TO
RELAX THE STRING FOR 30 SEC. RESUME
DRILLING AT REDUCED PARAMETERS: SKLBS
WOB, 130 RPM WITH REDUCED STICK SLIP,
SAME WHIRL ISSUES. VARY PARAMETERS
UNTIL WHIRLAND AND STICK SLIP WENT
AWAY. CONTACT NOV ANDERREAMER REP
TO HELP TROUBLE SHOOT ISSUE. CO-PILOT
DATA INDICATES DOWN HOLE TORQUE
VALUES TO BE NORMAL, INDICATING NO
UNDERREAMER ISSUES.
- POSSIBLY FORMATION RELATED AS THE
WELL CHANGED FROM THE CM2 TO THE CM1
AT 8577' MD AND/OR RELATED TO
DIRECTIONAL PLAN AS INC = 5° DURING
SIGNIFICANT DROPAND TURN.
Common Well Name: J-28
Event Type: RE-ENTER-(
Proiect: Prudhoe Bay
Active datum: J-28AActual 085.87,
Date From -To
06:00 - 12:00
North America - ALASKA - BP
Operation Summary Report
(RON) Start Date: 6/1612017 End Date. 7/8/2017
Site: PB J Pad
Spud Datemme: 5/17/1987 12:00:OOAM
CO.
R (above Mean Sea Level)
Him I Task Code NPT 1 Total Depth Phase
(hr) _' _ _ (uslt) _
6.00 1 DRILL P 9,065.00 INTI
INTI
Pnnted 8/6/2017 11:19:44AM *All depths reported in Drillers Depths'
Page 19 of 47
AFE No
X3 -0184N -C: (8,648,145.00)
BPUOI: USA00000397
Description of Operations
DIRECTIONAL DRILL 8-1/2" X 9.7/8" INT HOLE
FROM 883V MD TO 9065' MD IN CM1 AND HRZ
FORMATIONS (227' IN 6 HRS = 38 FPH WITH
CONNECTIONS).
-INSTANTANEOUS ROP =50 FPH, LIMITED
FOR ECD
- 700 GPM, 3600-3700 PSI ON/OFF BOTTOM,
150 RPM, TRO ON/OFF BTM =13-14/11-13
KFT-LBS, WOB = 7-12 KLBS
- MW IN/OUT= 10.3 PPG, NO LOSSES
- ECD CALC CLEANHOLE =10.9 PPG EMW,
ACTUAL = 11.4-11.5 PPG EMW, HARDLINE _
11.5 PPG EMW
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GAS WATCH: BACKGROUND = 200-300
UNITS, MAX = 378 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTION
- 9022' MD 35 BBL LOW VIS / HIGH VIS SWEEP
50% INCREASE IN CUTTINGS.
-CO-PILOT/UNDERREAMER NOTES: NO
VIBRATIONS OF NOTE, NO ISSUES DRILLING
THROUGH THE HRZ.
- TOP OF HRZ AT 8943' MD, -50' HIGH TO
PLAN. _
DIRECTIONAL DRILL 8-1/2" X 9-7/8" INT HOLE
FROM 9065' MD TO 9311' MD IN HRZ 8 KINGAK
FORMATIONS (246' IN 6 HRS = 41 FPH WITH
CONNECTIONS).
INSTANTANEOUS ROP =40-70 FPH
- 700 GPM, 3700 PSI OWOFF BOTTOM, 1580
RPM, TRO ON/OFF BTM =15/12 KFT-LBS,
WOB = 5-13 KLBS
- MW IN/OUT =10.3, NO LOSSES
- ECD CALL CLEANHOLE = 10.85 PPG EMW,
ACTUAL = 11.4 PPG EMW, HARDLINE = 11.5
PPG EMW
- SOFTSPEEDACTIVE FOR ENTIRE DRILLING
INTERVAL
- GAS WATCH: BACKGROUND = 200 UNITS,
MAX = 419 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTION
- CO-PILOT / UNDERREAMER NOTES: NO
ISSUES TO REPORT DRILLING THROUGH THE
KINGAK.
- TOP OF KINGAKAT 9255' MD, ^35' HIGH TO
PLAN.
I
1200.
- 18'.00
6.00
DRILL
P
9,311.00
INTI
Pnnted 8/6/2017 11:19:44AM *All depths reported in Drillers Depths'
Page 19 of 47
AFE No
X3 -0184N -C: (8,648,145.00)
BPUOI: USA00000397
Description of Operations
DIRECTIONAL DRILL 8-1/2" X 9.7/8" INT HOLE
FROM 883V MD TO 9065' MD IN CM1 AND HRZ
FORMATIONS (227' IN 6 HRS = 38 FPH WITH
CONNECTIONS).
-INSTANTANEOUS ROP =50 FPH, LIMITED
FOR ECD
- 700 GPM, 3600-3700 PSI ON/OFF BOTTOM,
150 RPM, TRO ON/OFF BTM =13-14/11-13
KFT-LBS, WOB = 7-12 KLBS
- MW IN/OUT= 10.3 PPG, NO LOSSES
- ECD CALC CLEANHOLE =10.9 PPG EMW,
ACTUAL = 11.4-11.5 PPG EMW, HARDLINE _
11.5 PPG EMW
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GAS WATCH: BACKGROUND = 200-300
UNITS, MAX = 378 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTION
- 9022' MD 35 BBL LOW VIS / HIGH VIS SWEEP
50% INCREASE IN CUTTINGS.
-CO-PILOT/UNDERREAMER NOTES: NO
VIBRATIONS OF NOTE, NO ISSUES DRILLING
THROUGH THE HRZ.
- TOP OF HRZ AT 8943' MD, -50' HIGH TO
PLAN. _
DIRECTIONAL DRILL 8-1/2" X 9-7/8" INT HOLE
FROM 9065' MD TO 9311' MD IN HRZ 8 KINGAK
FORMATIONS (246' IN 6 HRS = 41 FPH WITH
CONNECTIONS).
INSTANTANEOUS ROP =40-70 FPH
- 700 GPM, 3700 PSI OWOFF BOTTOM, 1580
RPM, TRO ON/OFF BTM =15/12 KFT-LBS,
WOB = 5-13 KLBS
- MW IN/OUT =10.3, NO LOSSES
- ECD CALL CLEANHOLE = 10.85 PPG EMW,
ACTUAL = 11.4 PPG EMW, HARDLINE = 11.5
PPG EMW
- SOFTSPEEDACTIVE FOR ENTIRE DRILLING
INTERVAL
- GAS WATCH: BACKGROUND = 200 UNITS,
MAX = 419 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTION
- CO-PILOT / UNDERREAMER NOTES: NO
ISSUES TO REPORT DRILLING THROUGH THE
KINGAK.
- TOP OF KINGAKAT 9255' MD, ^35' HIGH TO
PLAN.
Well Name: J-28
a: RE-ENTER- ONSHORE (MON)
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILL
Active datum: J-28AActual @85
North America - ALASKA- BP
Operation Summary Report
Start Date: 6/16/2017
Site: PB J Pad
Spud Date/Time: 5/17P
me Mean Sea Le
6/26/2017 00:00 - 06'.00 6.00 DRILL
End Date: 7/8/2017
Code NPT Total Depth Phase
(N=tU
P - 9,622.00 INTI
�jI.
P 9,942.00
INTI
Printed 8/8/2017 11:19:44AM *All depths reported in Drillers Depths`
Page 20 of 47
AFE No
(3 -0184N -C:(8,648,145.00)
Zig Release: 7/152017
Description of Operations
DIRECTIONAL DRILL 8-1/2" X 9-7/B" INT HOLE
FROM 9311' MD TO 9622' MD IN KINGAK
FORMATIONS (311' IN 6 HRS = 52 FPH WITH
CONNECTIONS).
- INSTANTANEOUS ROP = 50-80 FPH
- 700 GPM, 3720 PSI ON/OFF BOTTOM, 150
RPM, TRQ ON/OFF BTM = 16115 KFT-LBS,
WOB = 8-13 KLBS
- MW INIOUT=10.3 PPG, NO LOSSES
- ECD CALC CLEANHOLE = 10.85 PPG EMW,
ACTUAL= 11.46 PPG EMW, HARDLINE =11.5
PPG EMW
-LOSSES=ZERO- SOFTSPEED ACTIVE FOR
ENTIRE DRILLING INTERVAL
- GAS WATCH: BACKGROUND = 200 UNITS,
MAX = 330 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTION
- 9595' MD 35 BBL LOW VIS / HIGH VIS SWEEP
NO INCREASE IN CUTTINGS.
- CO-PILOT / UNDERREAMER NOTES: NO
ISSUES TO REPORT
- ACTUAL DRILLING HOURS FOR PAST 24
HOUR REPORTING PERIOD =19.5 HRS, 81%
- DIRECTIONALIGEO NOTES FOR THE DAY:
BUILDING ANGLE FROM VERTICAL TO -37°
INC WITH 2°/100' DLS
DIRECTIONAL DRILL a-1/2" X 9-7/8" INT HOLE
FROM 9622' MD TO 9942' MD IN KINGAK
FORMATION (320' IN 6 HRS = 53 FPH WITH
CONNECTIONS).
- INSTANTANEOUS ROP = 70 FPH
- 700 GPM, 3850 PSI ON/OFF BOTTOM, 150
RPM, TRO ON/OFF BTM = 17/16 KFT-LBS,
WOB = 8-13 KLBS
- MW IN/OUT= 10.3, NO LOSSES
- ECD CALC CLEANHOLE =10.93 PPG EMW,
ACTUAL= 11.5 PPG EMW, HARDLINE = 11.5
PPG EMW
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GAS WATCH: BACKGROUND =180 UNITS,
MAX = 206 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTION
- CO-PILOT/ UNDERREAMER NOTES: NO
Printed 8MI2017 11:19:44AM
`All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 21 of 47
Operation Summary Report
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/16/2017 End Date: 7/8/2017
X3-0184N-C: (8,648,145.00 )
Project Prudhoe Bay
Site: PB JPatl
Rig Name/No.: PARKER 272
Spud DateRme: 5/17/1987 12:OO:ODAM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-28A Actual @85.87usR (above Mean Sea Level)
Date From -To Him
Task Code NPT Total Depth I Phase
Description of Operations
(hr)
(us8)
06:00 - 12:00 6.00
DRILL P 10,345.00 INTI
DIRECTIONAL DRI LL 8-1/2"X9-7/8"INT HOLE
FROM 9942' MD TO 10345' MD IN KINGAK
FORMATION (403' IN 6 HRS = 67 FPH WITH
CONNECTIONS).
- INSTANTANEOUS ROP = 75-100 FPH
- 700 GPM, 3740 PSI ON/OFF BOTTOM, 150
RPM, TRO ON/OFF BTM = 19/18 KFT-LBS,
WOB = 8-14 KLBS
-MW IN/OUT =10.3
- ECD CALC CLEANHOLE = 10.9 PPG EMW,
ACTUAL= 11.50 PPG EMW, HARDLINE = 11.5
PPG EMW
I- LOSSES=ZERO
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
(INTERVAL
i- GAS WATCH: BACKGROUND = 120 UNITS,
MAX = 330 UNITS
'- NO BACKREAMING AT CONNECTIONS,
SURVEY EACH CONNECTION
-CO-PILOT/ UNDERREAMER NOTES: NO
I ISSUES TO REPORT
- SPR'S TAKEN AT 9783'MD/7851'TVD
- 9885'PUMP 35 BBL LOW /HIGH VIS SWEEP -
NO NOTICEABLE INCREASE IN CUTTINGS
�
jRETURNS.
Printed 8MI2017 11:19:44AM
`All depths reported in Drillers Depths"
Common Well Name: J-28
Event Type: RE-ENTER- ONSHORE (RON)
Protect Prudhoe Bav
Active datum: J-28AActual
North America - ALASKA - BP
Operation Summary Report
Start Date: 8/16/2017 End Date: 7/812017
Site: PB J Pad
Spud Date/rime: 5/17/1987 12:00 OOAM
Date
From -To
Hm Task
Code
NPT Total Depth
_
(hr)
I
(us8)
12:00 - 17:30
5.50
DRILL
P
10,670.00
Phase
INTI
Pnnted 8/6/2017 11 19 44A *All depths reported in Drillers Depths'
Page 22 of 47
AFE No
X3 -0184N -C: (8,648,145.00 )
Rig Release: 7/15/2017
BPUOI: USA00000397
FROM 10345' MD TO 10670' MD, 8635' TVD
(HOLE SECTION TD) IN KINGAK AND SAG
RIVER FORMATIONS (325' IN 5.5 HRS = 59 FPH
WITH CONNECTIONS).
- INSTANTANEOUS ROP = 60-75 FPH
- 700 GPM, 3785 PSI ON/OFF BOTTOM, 150
RPM, TRO ON/OFF BTM = 19/18KFT-LBS, WOB
= 8-14 KLBS
!- MW IN/OUT= 10.3 PPG, NO LOSSES
ECD CALC CLEAN HOLE = 10.91 PPG EMW,
ACTUAL= 11.41 PPG EMW, HARD LINE = 11.5
PPG EMW
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GAS WATCH: BACKGROUND =120 UNITS,
MAX = 164 UNITS
- NO BACKREAMING AT CONNECTIONS.
SURVEY EACH CONNECTION
- CO-PILOT / UNDER REAMER NOTES: NO
ISSUES TO REPORT
- ACTUAL DRILLING HOURS FOR PAST 24
HOUR REPORTING PERIOD =15.5 HRS, 89%
- DIRECTIONAL NOTES FOR THE DAY: BUILT
INCLINATION AT 2°/100' THROUGH SHALES
FROM 3° INC TO 37° INCAT SECTION TD. NO
MAJOR ISSUES, THOUGH BETTER SUCCESS
NOTED AT -75 FPH THAN 100 FPH. FINAL
POSITION = T LOW / 18' RIGHT OF PLAN AT
TD.
- TAKE SLOW PUMP RATESAND FINAL
SURVEY ON BOTTOM
7" INTERMEDIATE CASING POINT PICK
- FIX PARAMETERS FOR TJB MARKERAT 12
KLBS WOB, -60-70 FPH. OBSERVE REVERSE
DRILLING BREAK TO -25 FPH AT 10463' MD,
8380' TVD
- TJB MARKER THEN CONFIRMED WITH
GAMMA RAY AND RESISTIVITY. TSGR
EXPECTED AT 10672' MO, 8551' TVD (171'
ISOPACH AT 35' AVG INC)
- OBSERVE ROP SLOWDOWN AS
UNDERREAMER PASSES THROUGH TJB
MARKER (BIT DEPTH -10638' MD)
- ENCOUNTER REVERSE DRILLING BREAK AT
10665' MD. DRILLADDITIONAL VMD PER
CASING PICK PROCEDURE. CONFIRM SAG
RIVER SAND WITH GLAUCONITE IN FIRST
BOTTOMS UP SAMPLES.
- TOP OF SAG RIVER PICKED AT 10667' MD.
7" CASING PLANNED FOR 10668' MD (1' INTO
SAG RIVER, 2' RATHOLE)
"'CLOSE UNDERREAMER PER NOV
PROCEDURE AND REP 1850 STROKES (25%)
INTO FIRST BU AFTER TO
- PICK UP SLOWLY FROM TO TO PLACE TOOL
JOINT AT RIG FLOOR. SHUTDOWN PUMPS,
DROP 1-7/8" CLOSING BALL.
- PUMP BALL DOWN AT 100 GPM, 310 PSI, 40
RPM, 20KFT-LBS TRO, PULLING PIPE SLOWLY
Common Well Name: J-28
Event Type: RE-ENTER- ONSHORE (RON)
Proiect Prudhoe Bev
North America - ALASKA - BP
Operation Summary Report
Start Date: 6/18/2017 I End Date: 7/8/2017
AFE No
(8,648,145.00)
Page 23 of 47
Rig NameMo.: PARKER 272 Spud DateTme: 5/17/1987 12:00:OOAM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
SPUOI: USA00000397
Active datum: J-28AActual @85.87usft (above Mean Sea Level)
Date From - To Hrs Task CodeI NPT
Total Depth
Phase Description of Opembons
(hr)(usH)
OFF BOTTOM
-AFTER 22 MIN, OBSERVE PRESSURE
INCREASE TO 2400 PSI. SHUT DOWN PUMPS
FOR 2 MIN ALLOWING FOR CUTTERS TO
RELAX.
- RESUME CIRCULATING AT 750 GPM, 4150
SII
PSI, 120 RPM, 19K FT -LBS TRQ,
RECIPROCATING 30' STROKES AT 2.5 FPM TO
GET FIRST BOTTOMS UP AFTER TD
- DOWNLINK TO CLOSE AUTOTRAK RIBS,
—
ALLOW FOR FASTER RECIPROCATION.
.17:30 - 21:00 3.50 DRILL P 10,670.00
INTI CIRCULATE HOLE CLEAN AND CONDITION
MUD FOR TRIPPING WITH 4 TOTAL BOTTOMS
UP
- 750 GPM, ICP 4170 PSI, FOR 4090 PSI, 120
RPM, 18K FT -LBS TORQUE OFF
- PU-293K , SO -171K, ROT -2199K
-ECD CLEANHOLE= 10.91 PPG, ACTUAL 11.2
PPG, FINAL 11.15 PPG
- MW IN/OUT=10.3 PPG, NO LOSSES
- RECIPROCATE 45' WHILE CIRCULATING
FIRST TWO BOTTOMS UP
- PUMPED TOTAL OF TWO BOTTOMS UP AT
10670' MD (TD)
- PUMP 35 BBL HIGH VIS SWEEP AFTER
FIRST BOTTOMS UP. MINIMAL -10%
INCREASE IN CUTTINGSAT BOTTOMS UP.
- CONTINUE CIRCULATING AT 750 GPM, 4100
PSI, 120 RPM, 18K TO WHILE RACKING BACK
STANDS FROM TD 10670' MD TO 10450' MD
SHUT DOWN PUMP AND ROTATION AT 10450'
MD. RUN IN HOLE TO CHECK 8-1/2" X 9-7/8"
HOLE SECTION.
- RIH FROM 10450' MD TO -10525' MD INSIDE
TOP OF 8-1/2" HOLE AT 10495' MD, NO DRAG
OBSERVED.
- FLOWCHECK WELL FOR 10 MIN PRIOR TO
PULLING OUT OF THE HOLE(STATIC)
WEEKLY BORE FUNCTION TEST: SEE
REMARKS SECTION FOR DETAIL
21:00 - 0000 3.00 DRILL P 10,670.00
INTI PLANNED WIPER TRIP FROM INT TD: PUMP
OUT THROUGH THE SHALES WITH 8-1/2" X
9-7/8" RSS DRILLING ASSEMBLY FROM
INTERMEDIATE TO AT 10450' MD TO 9211' MD
ATMIDNIGHT.
- PULLING SPEED = 40 FPM, PUMPS AT 3/4
BPM, 90-100 PSI
- INITIAL PICKUP WEIGHT OFF BOTTOM = 305
KLBS (PUMPS OFF)
NO ISSUES WHILE PULLING IN OPEN HOLE.
6/27/2017 00:00 - 00:30 iT 0.50 DRILL P
10,670.00
INTI PLANNED WIPER TRIP FROM INTTD: PUMP
OUT OF THE HOLE WITH 8-1/2" X 9-7/8" RSS
DRILLING ASSEMBLY FROM 9211'MD TO
8900' MD
I
- PULLING SPEED = 40 FPM, PUMPS AT 3/4
BPM, 90-100 PSI
- INITIAL PICKUP WEIGHT OFF BOTTOM = 305
KLBS (PUMPS ON)
Pnnted 8/8.'2017 11:19.44AM 'All depths reported in Drillers Depths'
Common Well Name: J-28
Event Type: RE-ENTER- ONSHORE (RON)
Project: Prudhoe Bay
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLING CO.
Active datum: J -28A Actual @85.87usft (above
Date From -To Hi
(hr)
00:30 - 03:30 3.00
North America - ALASKA- BP
Operation Summary Report
Start Date: 6/16/2017 End Date: 7/8/2017
DateTme: 5/17/1987
Task Code NPT Total Depth Phase
(usft)
)RILL P—� iQ670.00 INTI
03:30 - 04:30 1.00 1 DRILL I P
3.50 DRILL P
08.00 - 11'.00 3.00 DRILL P
Page 24 of 47
AFE No
{8 0184N -C: (8,648,145.00 )
BPUOI: USA00000397
Description of Operations
OUT OF THE HOLE ON ELEVATORS FROM
8900' MD TO 2880' MID, 70' INSIDE THE 9-5/8"
WINDOWN AT 2880' MD
- PULLAT TRIP SPEEDS OUTLINED IN THE
WELL PROGRAM
- NO ISSUE WHEN BHA PULLED INTO THE
8-1/2" OH SECTION STARTING AT 3635' MD
- 20K OVER PULL OBSERVED AT 3680' MD BIT
DEPTH. WIPED CLEAN WITH ONE PASS.
- PULLED THE BHA THROUGH THE BOTTOM
OF THE 9-5/8" WINDOW AT 2967' MD WITH 10K
1 DRAG
- MONITOR WELL ON TRIP TANK -CORRECT
HOLE FILL OBSERVED FOR ENTIRE TRIP
10, 076.00 INTI PLANNED WIPER TRIP FROM INT TD:
CIRCULATE BOTTOMS UP X 2.5
- STAGE PUMPS UP TO 750 GPM, ICP = 3000
PSI, FCP = 2950 PSI , 120 RPM, 2 KFT-LBS TO
- PUMP 35 BBL HIGH VIS SWEEP- HOLE
UNLOADED WITH 100% INCREASE; SHAKERS
CLEANED UP AFTER
- RECIPROCATE FULL STAND WHILE
CIRCULATING BOTTOMS UP.
- SHAKERS CLEANED UP AFTER SWEEP OUT
OF THE HOLE
- MW IN/OUT = 10.3 PPG
- ECD CLEANHOLE = 10.92 PPG, ACTUAL=
11.20 / 11.02 PPG INITIAL/FINAL
- SHUT DOWN AND MONITOR WELL FOR 10
MIN PRIOR TO RUNNING IN HOLE- WELL
_ STATIC.
10,670.00 INTI PLANNED WIPER TRIP FROM INT TD: TRIP IN
HOLE WITH 8-1/2"X 9-7/8" RSS DRILLING
ASSEMBLY ON ELEVATORS FROM TOP OF
WIPER TRIPAT 2880' MD TO HOLE SECTION
TO AT 10670' MD. WASH FINAL 45' TO
BOTTOM; 3 BPM, 700 PSI .
- FILL EVERY 20 STANDS
- OBSERVE 10 KLBS SET DOWN AND MINOR
PACK -OFF WHEN STAGING UP PUMPSAT
10647 MD
10,670.00 INTI CIRCULATE HOLE CLEAN WITH 4 TOTAL
BOTTOMS UP UNTIL SHAKERS ARE CLEAN
- STAGE UP PUMPS OVER 1.25 HOURS IN 1
BPM INCREMENTS; OBSERVE SIGNS OT
THICK MUD
- 750 GPM, 4200 PSI ICP, 3960 PSI FCP, 120
RPM, 18-19 KFT-LBS, RECIPROCATING 1/2
STAND AT 500 FPH
- INITIAL ECD = 11.4 PPG, FINAL= 11.1 PPG
- MW IN/OUT= 10.3 PPG, NO LOSSES
- OBSERVE 1065 UNITS OF GAS ON FIRST
BOTTOMS UP. RETURN TO 125 UNITS
BACKGROUNDAFTER SPIKE
- PUMP (1) 40 BBL HI -VIS SWEEP WITH 50%
RETURNSINCREASE
- FLOWCHECK WELL FOR 10 MIN PRIOR TO
Printed 8/8/2017 11:19:44AM 'AII depths reported in Drillers Depths'
North America -ALASKA - BP Page 25 of 47
Operation Summary Report
Common Well Name: J-28 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/162017 End Date: 7/8/2017 X3-0184N-C: (6,648,145.00)
Project: Prudhoe BayS� Pte B aJ tlP
Rig Name/No.: PARKER 272 Spud DateTme: 5/17/1987 12:00:OOAM Rig Release: 7/15/2017
Rig Contractor. PARKER DRILLING CO. BPUOI: USA00000397
Active datum: J-28AACWal @85.8'
Data From -To
11:00 - 1730
Dove Mean Sea Level)
Hm Task Code NPT 1 Total Depth Phase
(hr) 11 (usft)
4.50 DRILL P 10,670.00 INTI
17:30 - 20:00 2.50 DRILL P
- 20:30 0.50 CASING P
- 23:00 2.50 CASING P
23:00 - 00:00 1.00 CASING P
10,670.00 INTI
10,670.00 INTI
10,670.00 INTI
10,670.00 INTI
Printed 6/82017 11:19:44AM 'All depths reported in Drillers Depths"
Description of Operations
PULL OUT OF THE HOLE WITH 8-12" X 9-7/8"
INT RSS DRILLING ASSEMBLY FROM HOLE
SECTION TD AT 10670' MD TO BHA AT 596' MD
- PUMP OUT THROUGH KINGAKAND HRZ
SHALES (10670' - 8943' MD); 40 FPM, 0.5 BPM,
60 PSI
- PULL ON ELEVATORS REMAINDER OF TRIP;
50 FPM WORKING UP TO 250 FPM IN CASED
HOLE)
- MONITOR HOLE FILL ON TRIP TANK. PUMP
DRY JOB AT TOP OF SHALES
NO ISSUES IN OPEN HOLE
- 7 KLBS DRAG NOTICED PULLING STIFF RSS
ASSEMBLY THROUGH WINDOW
- FLOWCHECK WELL FOR 10 MIN AT WINDOW
AND AT TOP OF BHA (STATIC)
LAYDOWN 8.11Z'X 9-7/8" INT RSS DRILLING
ASSEMBLY FROM 596' MD TO SURFACE.
-BIT GRADE: I -3 -CT -S -X -I -WT -TO
- UNDERREAMER GRADED: 1 - 1 - NO - A- X - I
- BT- TD; TOOL IN EXCELLENT CONDITION
WITH NEGLIGABLE WEAR.
- FUNCTION TEST BLIND SHEAR RAMS TO
COMPLETE REQUIREMETNS FOR 6IM17
WEEKLY BOPE FUNCTION TEST
CLEAN AND CLEAR FLOOR AFTER FINAL TRIP
OUT OF HOLE
RIG UP TO RUN T' LINER
- MAKE UP LINER HANGER / PACKER
ASSEMBLY TO RACK BACK IN DERRICK
(MINIMIZE STATIONARY TIME WITH LINER IN
OPEN HOLE)
- RIG UP DOYON CASING TONGS AND
TORQUE TURN EQUIPMENT
RUN T', 26#, L-80, VAM TOP HC
INTERMEDIATE LINER FROM SURFACE TO
LINER OVERALL LENGTH AT 546' MD
- FLOW CHECK WELL PRIOR TO RUNNING IN
HOLE (STATIC)
- MAKE UP SHOE TRACK (BAKERLOK
CONNECTIONS) AND CHECK FLOATS (PASS)
- APPLY JET -LUBE SEAL GUARD DOPE AND
TORQUE TURN ALL VAM TOP HC
CONNECTIONS TO OPT MU TORQUE 11950
FT -LBS. MAKE UP JOINTS WITH DOUBLE
STACK TONGS
- RUNNING SPEED IN CASED HOLE = 110 FPM
- VAM AND TUBULAR SOLUTIONS ALASKA
REPRESENTATIVES VERIFY TORQUE -TURN
GRAPHSAND INSPECT CONNECTIONS IF
NECESSARY, ALL CONNECTIONS GOOD
- RUN 33 FREE FLOATING 7-118!'X 8-1/4"
CENTRALIZERS (SHOE TRACKAND JOINTS
1-30)
- FILL CASING ON FLY, TOP OFF EVERY 10
JOINTS
Printed 8/82017 11:19:44AM "All depths reported in Drillers Depths`
North America - ALASKA - BP
Page 26 of 47
Operation Summary Report
Common Well Name: J-28
APE No
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 6/1812017 End Date:7/82X3-0184N-C:(8,648,145.00)
Project: Prudhoe Bay
Site: PB J Pao
Rig Name/No.: PARKER 272
Spud DateRme: 5/17/1987 12:00:OOAM
'Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
'.. BPUOI: USA00000397
Active datum: J-211AActual @85.87usft (above Mean Sea Level)
Date From - To Hrs
Task
Code
NPT Total Depth Phase
Description of Operations
(hr)
-00:00-
(usft)
6/28/2017 03:30
3.50
CASING P 10,870.00 INTI
RUN 7",26#, L-80, VAM TOP HC
INTERMEDIATE LINER FROM 548' MD TO 2921'
MD. ABOVE THE 95/8" WINDOW
j
-APPLY JET -LUBE SEAL GUARD DOPEAND
TORQUE TURN ALL VAM TOP HC
CONNECTIONS TO OPT MU TORQUE 11950
FT -LBS. MAKE UP JOINTS WITH DOUBLE
STACK TONGS
- RUNNING SPEED IN CASED HOLE =110 FPM
- VAM AND TUBULAR SOLUTIONS ALASKA
REPRESENTATIVES VERIFY TORQUE -TURN
GRAPHSAND INSPECT CONNECTIONS IF
NECESSARY, ALL CONNECTIONS GOOD
- RUN 33 FREE FLOATING 7-1/8" X 8-1/4"
CENTRALIZERS (SHOE TRACK AND JOINTS
1-30)
- FILL CASING ON FLY, TOP OFF EVERY 10
JOINTS
- NO LOSSES WHILE RUNNING IN CASED
0.50
CASING P 10,670.00 INTI
HOLE.
CIRCULATE BOTTOMS UPABOVE THE 9-5/8"
03:30 - 04:00
WINDOW AT 2921' MD
- STAGE PUMPS UP SLOWLY ALLOWING FOR
PRESSURE TO STABILIZE
- STAGE UP TO 10 BPM WITH 1250 PSI.
8.00
CASING P 10,670.00 INT1
- MW 10.3 PPG IN / OUT
RUN T', 26#, L-80, VAM TOP HC
04:00 - 12:00
INTERMEDIATE LINER FROM 2921' MD TO
OVERALL LENGTH AT 795T MD
-APPLY JET -LUBE SEAL GUARD DOPE AND
TORQUE TURN ALL VAM TOP HC
CONNECTIONS TO OPT MU TORQUE 11950
FT -LBS. MAKE UP JOINTS WITH DOUBLE
STACKTONGS
- RUNNING SPEED IN OPEN HOLE = 110 FPM
- MONITOR TRIP ON TRIP TANK CORRECT
MUD DISPLACEMENT OBSERVED
1.00
_
CASING P 10,670.00 INTI
- NO LOSSES IN OPEN HOLE
CROSSOVER TO DRILL PIPE AT 795TMD
12:00 - 13:00
- RIG UP 5" ELEVATORS
- PICK UP AND INSTALL WEATHERFORD
LINER HANGER / LINER TOP PACKER
ASSEMBLY PER WFT REP
- FINAL PICKUP / SLACKOFF WEIGHTS WITH
FULL LINER LENGTH = 243 / 136 KLBS AT
7953'MD
Printed 8/82017 11:19:44AM "All depths reported in Drillers Depths`
Common Well Name: J-28
Event Type: RE -ENTER -ONSHORE (RON)
North America - ALASKA - BP
Operation Summary Report
Start Date: 6/16/2017 End Date: 7/8/2017
Site: -PB Pad
AFE No
X3 -0184N -C: (8,648,145,00)
Page 27 of 47
Rig NameJNo.: PARKER 272 1 Spud DateTime: 5/17/1987 12:00:OOAM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
BPUO1: USA00000397
Active datum: J-28AActual @85.87usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth
Phase Description of Operations
_ (hr)
(usft)
13:00 - 15:30 2.50
CASING
P
10,670.00
INTI RUN 7", 26#, L-80, VAM TOP HC
INTERMEDIATE LINER ON 5" DRILL PIPE
j
FROM 7953' MD TO SECTION TO AT 10668' MD
- FILL PIPE EVERY 10 STANDS
- RUNNING SPEED = 60-100 FPM, MAX OF 110
FPM
- CIRCULATE BOTTOMS UP OVER THREE
JOINTS FROM 8570' MD TOABOVE THE HRZ
SHALES AT 8840'
- STAGING PUMPS UP SLOWLY ALLOWING
FOR PRESSURE TO STABILIZE.
- 300 GPM, 660 PSI.
- MONITOR DISPLACEMENT VIA ACTIVE PIT 1.
- NO ISSUES RUNNING IN HOLE AND NO FILL
I
NOTED ON BOTTOM
- RU CEMENT HEADAND RUN LAST JOINT
DOWN, TAG BOTTOM AT EXPECTED DEPTH
_
OF 10668'MD. CONFIRM WITH SKLB_S_ DOWN.
15:30 - 21:30
6.00
CASING
P 10,670.00
INTI STAGE UP PUMPS IN 1 BPM INCREMENTS TO
7 BPM CEMENTING RATE OVER 1.5 HOURS
- 384 PSI @ 2 BPM
-400 PSI @3BPM
-410 PSI @4 BPM
-515 PSI @@ BPM
-615 PSI @6 BPM
I
- 742 PSI @ 7 BPM
- CONDITION MUD TO 10.3 PPG, 18 YP
- RECIPROCATE PIPE STRETCH
-ICPAT FINAL CEMENTING RATE -745 PSI,
FCP AFTER CONDITIONING -660 PSI
- TOTAL OF TWO FULL CIRCULATIONS
Printed 8/82017
11:19:44AM *All depths reported in Drillers Depths`
North America - ALASKA - BP
Page 28 of 47
Operation Summary Report
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/162017 End Date: 7/82017
X3 -0184N -C: (8,648,145.00 )
Project: Prudhoe Bay Site: PB J Pad
Rig NameMo.: PARKER 272
Spud Date rime: 5/17/1987 12:00 OOAM
Rig Release: 7/152017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-28AActual @85.87usft (above Mean Sea Level)
Date From- To Hm Task Code NPT Total Depth Phase
Description of Operations
(hr) (usfl)
_
1121:30 - 23:30 2.00 CASING P 1 10,670.00 INTI
CEMENT T' INTERMEDIATE LINER TO WELL
PLAN 8 SLB CEMENTICS PROGRAM.
- FILL LINES WITH WATER AND PRESSURE
TEST TO 4500 PSI FOR 5 MINUTES
- PUMP 35 BBLS OF 12 PPO MUDPUSH It
SPACER @ 5 BPM, 180 PSI
-RELEASE BOTTOM DART FROM
WEATHERFORD CEMENT HEAD
- PUMP TOTAL 84 BBLS OF 15.8 PPG CLASS
G TAIL @ 5 BPM, EXCESS VOLUME 40%
(YIELD 1.17 CU.FT/SK)
- WITH 25 BBLS PUMPED, SLOW RATE TO 3
BPM TO OBSERVE BOTTOM DART LATCH. -
NO LATCH OBSERVED
- INCREASED RATE BACK TO 5 BPM FOR
REMAINDER OF THE CEMENT. ICP- 275-
FCP-215 PSI
- RELEASE TOP DART FROM WEATHERFORD
CEMENTHEAD
- SCHLUMBERGER CEMENTERS KICK OUT
DART WITH 10 BBL WATER AT 5 BPM
PERFORM DISPLACEMENT WITH RIG PUMPS
AND 10.3 PPG _SND MUD PER SLB
1
CEMENTICS
1
-15 BBLS DISPLACED AT 7 BPM: ICP 46 PSI,
1
SLOW DOWN TO 3 BPM FOR TOP DART
LATCH
-OBSERVE DART LATCH AT 291 STROKES
INTO DISPLACEMENT, CALCULATED FOR 319
STROKES (RECALCULATE PLUG BUMP WITH
LATCH CORRECTION)
- INCREASE RATE BACK T07 BPM, ICP -314
PSI, FCP-252
- PUMP 214 BBLS
- REDUCE RATE TO 3 BPM, 47 PSI, FOR
BOTTOM WIPER PLUG.
-PLUG LANDEDAND SHIFTED LANDING
COLLAR AT 2610 STROKES Is STROKES
EARLY)
- INCREASE RATE TO 7 BPM, PUMP 67.5 BBLS
ICP- 780 PSI, FCP-1300 PSI
- REDUCE RATE TO 3 BPM FOR PLUG BUMP.
ICP - 765 PSI, FCP AT PLUG BUMP 985 PSI
- BUMP PLUG WITH FINAL CIRCULATING
PRESSURE OF 985 PSI, INCREASE
PRESSURE TO 1450 PSI, HOLD FOR 5 MIN.,
CHECK FLOATS -GOOD
- TOTAL DISPLACEMENT VOLUME 324 BBLS
(MEASURED BY STROKES a 96% PUMP
EFFICIENCY) — (327 BBLS WAS CALCULATED
DISPLACEMENT)
- NO RECIPROCATION THROUGHOUT JOB
- TOTAL LOSSES FROM CEMENT EXIT SHOE
TO CEMENT IN PLACE: 0 BBLS
- CEMENT IN PLACE AT 23:27 PM
- ESTIMATED TOC BASED ON VOLUME
PUMPED, LOSSES, LIFT PRESSURE, -9368'
MD
SEE ATTACHED CEMENTING DOCUMENTS.
Printed 8/6/2017 1-1 19:44AM *AAI depths reported in Drillers Depths'
Common Well Name: J-28
Event Type: RE -ENTER -ONSHORE (RON)
North America -ALASKA- BP
Operation Summary Report
'tart Date: 6/162017 End Date: 7/8/2017
AFE No
K3 -0184N -C:(8,648,145.00)
Rig Naore/No.: PARKER 272 Spud DataRme: 5/17/1987 12:00:00AM Rig Release: 7/152017
Rig Contractor: PARKER DRILLING CO. BPUOI: USA00000397
Active datum: J-28AActual @85.87usft (above Mean Sea leve
Date From - To Him Task
(hr)
123:30 - 00:00 0.50 CASING
6/29/2017 00:00 - 0130 1.50
01:30 - 02:30 1.00
Page 29 of 47
Code NPT Total Depth Phase Description of Operations
(usft)
P 10,670.00 INT1 SET LINER HANGER AND RELEASE FROM
CASING P
CASING r P
RUNNING TOOL PER WEATHERFORD
PROCEDURE
- INCREASE PRESSURE TO 2800 PSI TO SET
HANGER, SET DOWN 40 KLBS TO CONFIRM
LINER HANGER IS SET
- INCREASE PRESSURE TO 4000 PSI TO
RELEASE LINER RUNNING TOOL
- PICK UP -8' ABOVE BREAK OVER AND
OBSERVE WEIGHT LOSS INDICATING
SUCCESSFUL RELEASE OF LINER RUNNING
TOOL
- INITIATE ROTATION AT 15 RPM AND SLACK
OFF 70K TO SET LINER TOP PACKER WITH
PACKER ACTUATOR
- OBSERVE POSITIVE INDICATION OF
PACKER SET _
10,670.00 INT1 RELEASE LINER RUNNING TOOLS, PICK UP
TO EXPOSE RACKOFF AND CIRCULATE HOLE
CLEAN WITH 2 BOTTOMS UP
- 11 BPM, 1300 PSI
_ - MUD WEIGHT 10.3 PPG IN/OUT
10,670.00 INTI PULL OUT OF HOLE WITH T' LINER RUNNING
TOOLS FROM 2800' MD TO SURFACE ON
ELEVATORS
-FINAL PICKUP/ SLACKOFF WEIGHTABOVE
TOL =115/98 KLBS
FLOW CHECK WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM, STATIC
- MUD WEIGHT 10.3 PPG IN / OUT
- MONITOR WELL VIA TRIP TANK (PROPER
DISPLACEMENT)
- NO ISSUES WHILE TRIPPING
Panted 8/8/2017 11:19:44AM *AA depths reported in Drillers Depths'
- RACK BACK HEAVY WEIGHT DRILL PIPE,
_
WILLBE LAID DOWN OFFLINE.
.0230
- 0330
1.00
CASING
P
10,670.00
INTI
LAY DOWN 7" LINER RUNNING TOOLS
- FLOW CHECK WELL PRIOR TO PULLING
NON-SHEARABLES THROUGH THE STACK
STATIC
-CLEAN AND CLEAR FLOOR AFTER TRIPPING
03:30
- 05:00
1.50
BOPSUR
P
10,670.00
INTI
CHANGE UPPER RAMS FROM 4-1/2"X T'
VARIABLE BORE RAMS TO 2-7/8" X 5"
VARIABLE BORE RAMS
- PULL 9-1/18" WEAR RING
- SET MCEVOY TEST PLUG AND RUN IN
LOCKDOWN SCREWS PER CAMERON REP__
05:00
- 06.00
1.00
BOPSUR
P
10,670.00
INTI
TEST UPPER PIPE RAMS TO 250 PSI LOW
AND 3500 PSI HIGH FOR 5 MIN (PASS)
- TEST WITH 4" TEST JOINT
..
- SEE ATTACHED PRESSURE TESTING CHART
0600
- 0700
1.00
SOPSUR
P
10,670,00
INTI
RIG DOWN AFTER CHANGING AND TESTING
RAMS
- BACK OUT LOCKDOWN SCREWS PER
CAMERON REP
- PULL TEST PLUG AND LAY DOWN TEST
JOINT
- SET 9-1/16" WEAR RING
Panted 8/8/2017 11:19:44AM *AA depths reported in Drillers Depths'
North America -ALASKA - BP Page 30 of 47
Operation Summary Report
Common Well Name: J-28 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/162017 End Date: 7/8/2017 X3 -0184N -C: (8,648,145.00)
Rig Name/No.: PARKER 272
Spud DataRme: 5/17/1987 12:00:00AM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
Active datum: J-28AActual @85.87usft (above Mean Sea Level)
- NEW 61/8" HUGHES VG-18DX ROLLER
CONE BIT, STEERABLE MOTOR (180° AKO),
GR/RES
- RUN JARS 6156' BEHIND THE BIT PER SLB
MODELING
- NO GHOST REAMERS
-4"HT-38 DRILL PIPE
- FLOW CHECK WELL FOR 10 MIN PRIOR TO
RUNNING IN HOLE, STATIC
BPUOI: USA00000397
Date
From- To
Him
Mr)
1.50
! Task Code
_ _
DRILL P
NPT Total Depth
(usft)
10,670.00
Phase Description of Operations
INTI MAKE UP 61/8" BAKER MOTOR PRODUCTION
- FILL PIPE EVERY 2000'MD
07:00 - 08:30
HOLE BUILD ASSEMBLY FROM SURFACE TO
172' MD
Printed 8/8/2017
11:19.44AM •AII depths reported in Drillers Depths'
- NEW 61/8" HUGHES VG-18DX ROLLER
CONE BIT, STEERABLE MOTOR (180° AKO),
GR/RES
- RUN JARS 6156' BEHIND THE BIT PER SLB
MODELING
- NO GHOST REAMERS
-4"HT-38 DRILL PIPE
- FLOW CHECK WELL FOR 10 MIN PRIOR TO
RUNNING IN HOLE, STATIC
08:30 - 14:30 6.00 DRILL i P 10,670.00
INTI TRIP IN HOLE WITH 61/6" BUILD ASSEMBLY
FROM BHA AT 172' MD TO 10459' MO ON
ELEVATORS
- FILL PIPE EVERY 2000'MD
- TRIPPING SPEED = 265 FPM
- MONITOR WELL ON TRIP TANK (PROPER
DISPLACEMENT)
- MUD WEIGHT 10.3 PPG IN/OUT
- NO ISSUES TRIPPING IN HOLE
14:30 - 16:00 1.50 DRILL P10,670.00
INTI PRESSURE TEST T'UNERAND LINER TOP
PACKER AGAINST UPPER RAMS WITH 10.3
PPG LSND TO 250 PSI LOW FOR 5 MIN AND
3500 PSI HIGH FOR 30 MIN (PASSING TEST
PER ACCEPTANCE CRITERIA3B IN TABLE
OF BP PRACTICE 100218). SEE ATTACHED
DOCUMENTATION.
- CEMENT REACHES 500 PSI COMPRESSIVE
STRENGTH AT 08:32 HRS ON 6/29/17
- PUMPAND BLEED BACK 6 BBLS
- LOSE 40 PSI IN THE FIRST 15 MIN AND 0 PSI
IN THE SECOND 15 MIN
! _
-TESTAPPROVED BYACTING WSUP
16:00 - 16:30 0.50 DRILL P 10,670.00
INT1 WASH DOWN WITH 61/8" DRILLING
ASSEMBLY FROM 10459' MD TO 10572' MD
- TAG TOP OF PLUGS AT 10572
- 300 GPM, 2645 PSI, 60 RPM, 6 KFT-LBS TO,
ROT -150K
- OBSERVED CEMENT STRINGERS FROM
_ 10_550' MD TO 10572' MD, SET 3-4K DOWN.
16:30 - 20:00 3.50 DRILL P 10,670.00
INTI DRILL OUT SHOE TRACK AND CEMENT
PLUGS TO 10' ABOVE THE 7" SHOE FROM
10572' MD TO 10658' MD (10' FROM SHOE)
- 300 GPM, 2645 PSI, 60 RPM, 69 KFT-LBS
TRO, 5-17 KLBS WOB
- TAG CEMENT PLUGS ON DEPTH
- 1 HOUR TO DRILL THROUGH CEMENT
PLUGS
MW- 10.3 PPG IN / OUT
SLOW PUMP RATES @ 10459' MD WITH 10.3
PPG LSND:
MP#1: 30 SPM = 660 PSI, 40 SPM = 930 PSI
MP#2: 30 SPM = 640 PSI, 40 SPM = 920 PSI
Printed 8/8/2017
11:19.44AM •AII depths reported in Drillers Depths'
Printed 8/8/2017 11 19 44A •AII depths reported in Drillers Depths'
North America - ALASKA - BP
Page 31 of 47
Operation Summary Report
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/16/2017 End Date: 7/8/2017
X3 -0184N -C: (8,648,145.00)
Project: Prudhoe Bay
Site: PB J Pad
Rig Name/No.: PARKER 272
Spud Date/Time: 5/17/1987 12:00:OOAM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
_Active datum: J -28A Actual @85.81(above Mean Sea Level)
Date
From - To
Hm
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
2.00
DRILL P
(usft)
15670.00 INTI
DISPLACE WELL FROM 10.3 PPG LSND TO 8.6
20:00 - 22:00
PPG OUIKDRIL-N
- 300 GPM, 1680 PSI (PRESSURES WITHIN 500
PSI UPPER AND LOWER BOUNDS
ACCORDING TO BAROID DISPLACEMENT
MODEL -SEE ATTACHED CHART)
- PUMP 40 BELS 8.5 PPG SEAWATER SPACER,
40 BBLS 8.6 PPG HI -VIS CUIKDRIL SPACER
AND 8.6 PPG EP MUDLUBE OUIKDRIL SPACER
AHEAD OF FULL HOLE VOLUME OF 8.6 PPG
OUIKDRIL
'- MONITOR BBL INAND BBL OUT.
- ROTATE 30 RPM, RECIPROCATE FULL
STAND DURING DISPLACEMENT
SLOW PUMP RATES @ 10648' MD WITH 8.6
PPG OUIKDRIL-N:
MP#1: 30 SPM = 520 PSI, 40 SPM = 690 PSI
MP#2: 30 SPM = 520 PSI, 40 SPM = 690 PSI
22:00 - 22:30
0.50
DRILL
P
10,670.00
INTI
_
PERFORM 30 MIN N0 -FLOW TEST AFTER
DISPLACEMENT. WELL IS STATIC.
- TESTAPPROVED BY WSUP (VERBAL)
_
22:30 23:30 1.00
DRILL P 10,670.00 INT1
SLIPAND CUT DRILLING LINE
CUT 250'
- SERVICE TOP DRIVE.
CALIBRATE BLOCKS
23:30 - 00:00 0.50
DRILL P 10,670.00 INT1
DRILL OUT REMAINING 10' OF SHOE TRACK
AND V OF RATHOLE FROM 10658' MO TO
10671' MD
- 300 GPM, 1760 PSI ON 1610 PSI OFF, 60
RPM, 6-8 KFT-LBS TRO OWOFF BOTTOM, 7-12
KLBS WOB
- PERFORM 15 MIN FLOW CHECK PRIOR TO
DRILLING NEW FORMATION PER THE WELL
PROGRAM. - WELL STATIC.
MW- 8.6 PPG IN/OUT.
6/30/2017 00:00 - 00:30 0.50
BOPSUR P 10.690.00 INT1
DRILL 20' OF NEW FORMATION FROM 10760'
MD TO LOT DEPTH AT 10690' MD
- 300 GPM, 1760 PSI, 60 RPM, 8-8 KFT-LBS
TRO ON/OFF BOTTOM, 10-12 KLBS WOB
00:30 - 0130 1.00
DRILL P 10,690.00 INTI
CIRCULATE BOTTOMS UP TO CONDITION
HOLE PRIOR TO LOT
- 300 GPM, 1670 PSI, ROTATE 60 RPM W/ 8K
''i
TO 8 RECIPROCATE 60' STROKES WHILE
CIRCULATING
-MW IN/OUT =8.6 PPG
01:30 - 02:00 0.5D
DRILL P 10,690.00 INTI
_
PERFORM FIT ON T' LINER SHOE TO 9.9 PPG
- 10670' MD, 8635' TVD, 8.6 PPG MW, 610 PSI
APPLIED SURFACE PRESSURE.
- PRESSURE BLEEDS FROM 610 PSI TO 580
PSI OVER 10 MIN.
j
- 2.6 BBLS TO PRESSURE UP, 2.5 BELS BLED
BACK.
- OBTAIN AUTHORIZATION TO PROCEED
FROM ODE.
- SEE ATTACHED LOT CHART AND
CALCULATOR.
Printed 8/8/2017 11 19 44A •AII depths reported in Drillers Depths'
Common Well Name: J-28
Event Type: RE -ENTER -ONSHORE (RON)
Rig Name/No.: PARKER
Active dahim: J-28AActual @85.87usft (above Mean Sea Lei
Date From - To Hrs Task
(hr)
02:00 - 08:00 4.00 DRILL
North America - ALASKA - BP
Operation Summary Report
6/1132017 End Date: 7/8/2017
Code NPT ' Total Depth I Phase
P
06:00 - 1200 6.00 DRILL P 10,962.00 PROD1
Printed 8/8/2017 11:19:44AM *All depths reported in Drillers Depths`
Page 32 of 47
AFE No
X3 -0194N -C:(8,648,145.00)
Rig Release: 7/15/2017
Description of Operations
DIRECTIONAL DRILL 6-1/8" PROD HOLE BUILD
SECTION IN SAG & SHUBLIK FORMATIONS
FROM 10690' MD TO 10775' MD (85' IN 4.0 HRS
= 21 FPH WITH CONNECTIONS 8 SURVEYS)
INSTANTANEOUS POP =25-40 FPH
- 300 GPM, 1790 PSI ON BOTTOM, 60 RPM, 13 /
10 KFT-LBS TRO ON/OFF BTM, 10-12 KLBS
WOB.
- MW IN/OUT = 8.6 PPG.
- NO LOSSES TO FORMATION WHILE
DRILLING AHEAD.
- SURVEY EVERY 30' FOR DOGLEGS> 5°/100'
- NO BACKREAMING AT CONNECTIONS.
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL.
- OBTAIN 1ST CLEAN DIRECTIONAL SURVEY
AT 10,863.
- DRILLING ON DIRECTIONAL PLAN WITH NO
ISSUES.
- 7" LINER SHOE OFFICIALLY LOGGED AFTER
DRILLOUTAT 10669' MD (ON DEPTH WITH
LINER TALLY. NO DEPTH CORRECTIONS
MADE TO LINER TALLY). TSGR LOGGEDAT
10667' MD.
- GAS WATCH: AVERAGE BACKGROUND = 25
UNITS, MAXIMUM = 65 UNITS. _
DIRECTIONAL DRILL 6-1/8" PROD HOLE BUILD
SECTION IN SHUBLIK 81VISHAK FORMATION
FROM 10775' MD TO 10962' MD (187' IN 6 HRS
= 31 FPH WITH CONNECTIONS)
INSTANTANEOUS ROP = 20-60 FPH
- 300 GPM, 1770-1860 PSI ON BOTTOM, 60
RPM, 10/8 KFT-LBS TRO ON/OFF BTM, 1012
KLBS WOB
- MW IN/OUT = 8.6 PPG
- NO LOSSES TO FORMATION WHILE
DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS, 5-1100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- DRILLING ON DIRECTIONAL PLAN WITH NO
ISSUES.
- GAS WATCH: AVERAGE BACKGROUND =
25-65UNITS, MAXIMUM = 276 UNITS
Common Well Name: J-28
Event Type: RE -ENTER -C
North America - ALASKA- BP
Operation Summary Report
(RON) Start Date: 6/16/2017
Site: PB J Pad
End Date: 7/82017
AFE No
X3 -0184N -C: (8,648,145.00)
Page 33 of 47
Rig Name/No.: PARKER 272 Spud DateRme: 5/17/1987 12:00:00AM Rig Release: 7/152017 1
Active datum: J-28AActual @85.87usR (above Mean Sea Level)
Date
From - To Hm Task Code NPT Total Depth Phase
Description of Operations
_
(hr)_ _ _ (us8)
12:00 - 18:00
_
6.00 DRILL P 11,245.00 PROD1
DIRECTIONAL DRILL 6-118" PROD HOLE BUILD
SECTION IN IVISHAK FORMATION FROM
10962' MD TO 11245' MD (283' IN 6 HRS = 47
FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP = 50-120 FPH
- 300 GPM,1770-1860 PSI ON BOTTOM, 60
RPM, 10/8 KFT-LBS TRQ ON/OFF BTM, 10.12
KLBS WOB
- MW IN/OUT = 8.6 PPG
- SLIGHT SEEPAGE LOSSES TO FORMATION
WHILE DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS> 5°/100'
- NO BACKREAMING AT CONNECTIONS
-
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- DRILLING ON DIRECTIONAL PLAN WITH NO
ISSUES.
GAS WATCH: AVERAGE BACKGROUND=
30-120 UNITS, MAXIMUM = 524 UNITS
18:00 - 23:30
5.50
DRILL P 11,495.00
PROD1
DIRECTIONAL DRILL 6-1/8" PROD HOLE BUILD
SECTION IN IVISHAK FORMATION FROM
11245' MD TO 11495'MD (250' IN 6 HRS = 42
FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP= 30-120 FPH
- 300 GPM,1770-1860 PSI ON BOTTOM, 60
RPM, 10/8 KFT-LBS TRO ON/OFF BTM, 10-12
KLBS WOB
- MW IN/OUT = 8.6 PPG
- SLIGHT SEEPAGE LOSSES TO FORMATION
WHILE DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS> 5°/100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- DRILLING ON DIRECTIONAL PLAN WITH NO
ISSUES.
- SPR'S TAKEN AT BUILD SECTION TO.
-GAS WATCH: AVERAGE BACKGROUND = 175
UNITS, MAXIMUM = 381 UNITS
- ACTUAL DRILLING TIME FOR 24 HOUR
PERIOD =12.3 HOURS. (ART -3.6 HRS,
AST=8.5 HRS)
- JAR HOURS =21.4 HOURS
- DIRECTIONAUGEO NOTES FOR THE DAY:
LANDED THE BUILD SECTION AT 112° INC &
239 AZ, 32' HIGH TO PLAN PER THE GEO
REQUEST & 37' RIGHT OF PLAN DUE TO
FORMATION. TOP OF TSAD AT 1083T MD (12'
LOW TO PROG) INVERT # 1 AT 11170' MD,
_
- 24 HOUR FLUID LOSS: 83 BBLS
23:30 - 0000 050 DRILL P 11,495.00 PROD?
_
PLANNED BHA TRIP:
- CIRCULATE WELLBORE CLEAN. PUMP HIGH
VIS SWEEP SURFACE TO SURFACE.
- TOTAL OF 2.5 BOTTOMS UP.
- 300 GPM, 1860 PSI , 60 RPM, 9K TO,
- PU- 194K, SO -132K, ROT- 156K
MW- 8.6 PPG IN / OUT. - NO LOSSES
RECIPROCATE PIPE FULL STAND WHILE
PUMPING
Printed 8/8/2017 11:19:44AM 'Ali depths reported in Drillers Depths'
Common Well Name: J-28
Event Type: RE -ENTER -ONSHORE
I Rig Name/No.: PARKER
North America -ALASKA - BP
Operation Summary Report
Stan Date: 6/162017 End Date: 7/8/2017
Active datum: J-28AActual @85.87usft (above Mean Sea Leveq
Date From - To
Hrs
Task
Code NPT
11,495.00
PROD1 PLANNED BHA TRIP:
- CIRCULATE WELLBORE CLEAN. PUMP HIGH
7/1/2017 00:00 - 02:00
2.00
DRILL
I
P
- TOTAL OF 2.5 BOTTOMS UP.
I
P
102:00 - 07:00
5.00
DRILL
0700 - O8:30
1.50
DRILL
P
0830 - 09:30
1.00
DRILL
P
12:00:OOAM
Page 34 of 47
AFE No
X3-Ota4N-C: (8,548,145.00 )
Rig Release: 7/15/2017
BPUOI: USA00000397
Printed 8/82017 11'1944AM 'All depths reported in Drillers Depths`
Total Depth
Phase Description of Operations
(usft)
11,495.00
PROD1 PLANNED BHA TRIP:
- CIRCULATE WELLBORE CLEAN. PUMP HIGH
VIS SWEEP SURFACE TO SURFACE. - 25%
INCREASE IN CUTTINGSAT BOTTOMS UP
- TOTAL OF 2.5 BOTTOMS UP.
- 300 GPM, 1860 PSI, 60 RPM, 9K TO,
- PU- 194K, SO -132K, ROT- 156K
MW -8.6 PPG IN/OUT. - NO LOSSES
RECIPROCATE PIPE FULL STAND WHILE
PUMPING
11,495.00
PRODt PLANNED BHA TRIP: TRIP OUT OF OPEN
HOLE WITH 6-1/8" PRODUCTION HOLE BUILD
ASSEMBLY FROM 11495' MD TO 172'
- FLOW CHECK WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM, 1/2 FOOT FLUID
LEVEL DROP INSIDE THE BORE
- FINAL PICKUP / SLACK OFF WEIGHTS ON
BOTTOM = PU 194 KLBS, SO 135 KLBS
- MONITOR WELL VIA TRIP TANK (PROPER
DISPLACEMENT)- LOST -6 BELS WHILE
PULLING OUT OF THE HOLE
-MW 8.6 PPG IN/OUT
- PULLING SPEED = 50-200 FPM PER THE
APPROVED WELL PROGRAM TRIPPING
PRACTICES TO MAINTAIN ECD'S OVER 7.4
PPG EMW
- NO ISSUES WHILE TRIPPING OUT OF OPEN
HOLE - NO TIGHT SPOTS NOTED.
- NO ISSUE PULLING THROUGH THE SHOE
11,495.00
PROD1 PLANNED BHA TRIP: HANDLE 6-1/8"
PRODUCTION HOLE DRILLING ASSEMBLY # 4
ON SURFACE
- PULLAND LAYDOWN BHA FROM 172' TO
SURFACE
- BREAK OFF 6-1/8" HCC VG-18OX INSERT BIT,
GRADED 2 -4 -BT -A -E -IN -WT -BHA
- DOWNLOAD ONTRAKAND LWD DATA
- FLOW CHECK WELL FOR 10 MIN PRIOR TO
PULLING NON-SHEARABLES THROUGH THE
STACK, STATIC
11 495.00
PROD1 CLEAN AND CLEAR RIG FLOOR:
- PICK UPAND MAKE UP TOOLS FOR BOPE
TEST
- PULLAND INSPECT WEAR RING.
- SET MCEVOY TEST PLUG. CAMERON REP
ON LOCATION TO RUN IN LOCK DOWN
SCREWS AND VERIFY SETTING
- FLUSH SURFACE LINES.
-PERFORM SHELL TEST TO 3500 PSI
Printed 8/82017 11'1944AM 'All depths reported in Drillers Depths`
Ion Well Name: J-28
Type: RE-ENTER- ONSHORE (RON)
Active tlatum: J-28AActual @85.87usft (above
Date1 From -To Him
North America -ALASKA - BP
Operation Summary Report
Start Date: 6/16/2017 Eno Date: 7/8/2017
Site: PB J Pad -- _
Spud DateI 5/17/1987 12:00:OOAM
;as Level) _
Task Code NPT Total Depth I Phase
12:00
- 13:00
1.00
WHSUR P
13:00
- 1600
3.00
DRILL
P
11,495.00 PROD1
11,495.00 PROD1
16.00 - 0000 8.00 DRILL P 11,495.00
Page 35 of 47
AFE No
X3 -0184N -C:(8,648,145.001
Rig Release: 7/15/2017
BPUOI: USA00000397
Description of Operations
TEST BOPE TO 250 PSI LOW AND 3500 PSI
HIGH FOR FIVE MIN EACH PER BP
STANDARDS ANDAOGCC REGULATIONS
- TEST WITNESS WAIVED BY AOGCC
REPRESENTATIVE BOB NOBLE VIA EMAIL
- TEST ANNULAR PREVENTER WITH 2-7/8"
TEST JOINTS (SMALLEST DP)
- TEST UPPER VERS WITH 2-7/8" AND 4-1/2"
TEST JOINTS
- TEST LOWER VBRS WITH 2-7/8" AND 4-1/2"
TEST JOINTS
- CHOKE MANIFOLD TESTED OFFLINE.
- COMPLETE BLACKOUT TEST
- NO FAILURES, SEE ATTACHED
DOCUMENTATION
PULL TEST PLUG
- BOLDS, PULL TEST PLUG PER CAMERON
DIRECTION.
- INSTALL NEW WEAR RING - (6-7/8" ID)
- LD TEST JOINT
- BLOW DOWN SURFACE LINES
PLANNEDBHATRIP: HANDLE 6-1/8"RSS
PRODUCTION HOLE BHA FROM SURFACE TO
1209'
-RUN USED 6-1/8" HCYA PDC, SKH513D,
- RSS WITH PORTED FLOAT, GR AT BIT,
GR/RES/NEU/DEN, STARTRAK IMAGE LOG,
4-7/8' MOCS CIRCULATION SUB 209' FROM
BIT
- RUN JARS 6193' BEHIND THE BIT PER SLB
MODELING
- NO GHOST REAMERS
- FLOW CHECK WELL FOR 10 MIN PRIOR TO
PROD1 PLANNED BHA TRIP: TRIP IN HOLE WITH
6-1/8" PRODUCTION HOLE DRILLING
ASSEMBLY FROM BHAAT 209' MD TO 11495'
MD
- FILL PIPE EVERY 2000' MD
- TRIPPING SPEED = 90-100 FPM IN CASED
HOLE, 50-60 FPM IN OPEN HOLE
- MONITOR WELL ON TRIP TANK (PROPER
DISPLACEMENT) SLIGHT LOSS OF 6 BBLS
OVER ENTIRE TRIP.
- MUD WEIGHT 8.65 PPG IN/OUT
- NO ISSUES TRIPPING IN HOLE
- WASH FINAL STAND DOWN FROM 11440' MD
TO 11495' AT 300 GPM, 1900 PSI, NO FILL ON
BOTTOM.
- SHALLOW HOLE TEST MWD TOOLS: 300
GPM, 1050 PSI
AT 1150'. 3045' & 5772' MD - TROUBLE
SHOOTING SOME BACKGROUND NOISE.
- BAKER MWD ABLE TO SUCCESSFULLY
TROUBLE SHOOT ISSUE, TOOLS
FUNCTIONING NORMALLY.
- OBTAIN SPR'S ON BOTTOMAT 11495' MD
Printed a/8/2017 11:19:44AM 'All depths reported in Drillers Depths'
North America -ALASKA - BP
Operation Summary Report
Page 36 of 47
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/16/2017 End Date. 7/8/2017
X3 -0184N -C: (8,648,145.00)
Project: Prudhoe Bay
Site: PEI J Pad
Rig Name/No.: PARKER 272
Spud Date/Time: 5/17/1987 12:00;00AM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-28AActual @85.87usft (above Mean Sea Level)
Date From -To Him
Task Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
7/2/2017 00:00 - 06:00 6.00
DRILL P 11,789.00 f PROD1
DIRECTIONAL DRILL 6-1/8" PROD HOLE BUI LD
SECTION IN IVISHAKAND SHUBLIK
FORMATIONS FROM 11495' MD TO 11 789'MD
(294' IN 6 HRS = 49 FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP=30-120 FPH
I
- 300 GPM, 1900-1950 PSI ON/OFF BOTTOM,
145 RPM, 12/10 KFT-LBS TRO ON/OFF BTM,
e-10 KLBS WOB
- MW IN/OUT = 8.6 PPG
- SLIGHT SEEPAGE LOSSES TO FORMATION
WHILE DRILLINGAHEAD (<5 BPH)
- SURVEY EVERY STAND FOR DOGLEGS <
5°1100'
- SURVEY EVERY 30' FOR DOGLEGS > 5°/100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GEOSTEERING PER WELLSITE GEOLOGIST
WITH NO ISSUES
- GAS WATCH: AVERAGE BACKGROUND = 65
UNITS, MAXIMUM = 150 UNITS
06.00 - 1200 6.00
DRILL P 12,173.00 PROD1
DIRECTIONAL DRILL6-1/8"PROD HOLE BUILD
AND LATERAL SECTIONS IN SHUBLIKAND
SAG RIVER FORMATIONS FROM 11789' MD TO
12173' MD (384' IN 6 HRS = 64 FPH WITH
CONNECTIONS)
- INSTANTANEOUS ROP = 100 FPH
- 300 GPM, 1900-2000 PSI ON/OFF BOTTOM,
150 RPM, 12/10 KFT-LBS TRO ON/OFF BTM,
5-8 KLBS WOB
- MW IN/OUT = 8.6 PPG
- SLIGHT SEEPAGE LOSSES TO FORMATION
WHILE DRILLING AHEAD (<5 BPH)
- SURVEY EVERY STAND FOR DOGLEGS <
5'/100'
- SURVEY EVERY 30' FOR DOGLEGS, 5°1100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GEOSTEERING PER WELLSITE GEOLOGIST
WITH NO ISSUES;
- GAS WATCH: AVERAGE BACKGROUND = 45
UNITS, MAXIMUM = 130 UNITS
Printed 6/6/2017 11.19:44AM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: J-28
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/162017
P ieG: Prudhoe Bay
She: PB J Red
Rig Name/No.: PARKER 272
Spud DateRme: 5/17
Rig Contractor: PARKER DRILLING CO.
LATERAL SECTION IN SAG RIVER
Active datum: J-28AActual Q85.87usft (above Mean Sea Level)
Date i From - To Him
I Task Code
P
18:00 - 00:00 I 6.00 I DRILL I P
Page 37 of 47
AFE No
End Date. 7/8/2017 X3 -0194N -C:(8,648,145.00)
Rig Release: 7/152017
Printed 8/82017 11.19.44AM •AII depths reported in Drillers Depths'
Total Depth Phase
Description of Operations
(usft)
12,688.00 PROD1
DIRECTIONALDRILL6-1/8"PROD HOLE
LATERAL SECTION IN SAG RIVER
FORMATION FROM 12173' MD TO 12668' MD
(495' IN 6 HRS = 83 FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP = 100-150 FPH
- 300 GPM, 2000-2100 PSI ON/OFF BOTTOM,
150 RPM, 13 / 11 KFT-LBS TRO ON/OFF BTM,
8-10 KLBS WOB
- MW IN/OUT = 8.6 PPG
- SLIGHT SEEPAGE LOSSES TO FORMATION
WHILE DRILLING AHEAD (<5 BPH)
- SURVEY EVERY STAND FOR DOGLEGS <
5°/100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GEOSTEERING PER WELLSITE GEOLOGIST
WITH NO ISSUES
- 12006' MD 35 BBL HIGH VIS SWEEP 50%
INCREASE IN CUTTINGS.
- 12478' MD 35 BBL HIGH VIS SWEEP 0%
INCREASE IN CUTTINGS.
- GAS WATCH: AVERAGE BACKGROUND =100
UNITS, MAXIMUM =210 UNITS
13,109.00 PROD?
DIRECTIONAL DRILL6-1/8"PROD HOLE
LATERAL SECTION IN SAG RIVER
FORMATION FROM 12668' MD TO 13137' MD
(441' IN 6 HRS = 74 FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP = 150 FPH
- 300 GPM, 2100-2150 PSI ON/OFF BOTTOM,
150 RPM, 12-16/11 KFT-LBS TRO ON/OFF BTM,
5-8 KLBS WOB
-MW INI=8.6 PPG 18.6+
- SLIGHT SEEPAGE LOSSES TO FORMATION
WHILE DRILLING AHEAD (<5 BPH)
- SURVEY EVERY STAND FOR DOGLEGS <
5°/100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GEOSTEERING PER WELLSITE GEOLOGIST
WITH NO ISSUES
- 13046' MD 35 BBL HIGH VIS SWEEP MINIMAL
INCREASE IN CUTTINGS.
-GAS WATCH: AVERAGE BACKGROUND= 160
UNITS, MAXIMUM = 330 UNITS.
- ACTUAL DRILLING TIME FOR 24 HOUR
PERIOD = 15.4 HOURS.
- JAR HOURS =28.3 HOURS
- DIRECTIONALIGEO NOTES FOR THE DAY:
ENTER SAG RIVER (TSHU MARKER) AT 11800'
MD, REVERT POINT #1 AT 12110' MD IN SAG
RIVER
Printed 8/82017 11.19.44AM •AII depths reported in Drillers Depths'
Common Well Name: J-28
Event Type: RE -ENTER -
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLI�
Active datum: J-28AAc ua1 @85.8
Date From - To
7/3/2017100:00 - 05:30
North Annenca-ALASKA - BP
Operation Summary Report
(RON) Start Date: 6/16/2017 End Date: 7/8/2017
-- Site: PB J Pad
Spud DateTime: 5/17/1987 12:00:OOAM
Love Mean Sea Level)
Hrs Task Code NPT Total Depth I Phase
AFE No
X3 -0184N -O. (8,648,145.00 )
BPUOI: USA00000397
Description of Operations
Page 38 of 47
LATERAL SECTION IN SAG RIVER
FORMATION FROM 11137'11113111 MD
(375' IN 5.5 HRS = 68 FPH WITH
CONNECTIONS)
i- INSTANTANEOUS ROP = 100-150 FPH
- CONTROL DRILLING AT MAXIMUM OF 150
FPH PER WELL PROGRAM, REDUCE ROP TO
100 FPH INTERMITTENTLY FOR IMRPOVED
DIRECTIONAL CONTROL
- 300 GPM, 2100-2150 PSI ON/OFF BOTTOM,
150 RPM, 12-16/11 KFT-LBS TRQ ON/OFF BTM,
5-8 KLBS WOB
- MW IN/OUT = 8.618.6- PPG
- SLIGHT SEEPAGE LOSSES TO FORMATION
WHILE DRILLING AHEAD (<5 BPH)
- SURVEY EVERY STAND FOR DOGLEGS <
5°/100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEEDACTIVE FOR ENTIRE DRILLING
INTERVAL
- OBSERVED PLANNED FAULT#1 AT 13165'
MD, FAULTED FROM SHUBLIK INTO
TRANSITION ZONE AT BOTTOM OF KINGAK.
ESTIMATED FAULT THROW OF -44' TVD.
DRILLED TOTAL OF 32' MD OF KINGAK
TRANSITION ZONE PRIOR TO RE-ENTERING
SAG RIVER.
- AFTER CROSSING FAULT, ATTEMPT TO
LAND WELL IN MIDDLE OF SAG RIVER
PRODUCTIVE ZONE. TSHU ENCOUNTERED
AT 13474' MD DUE TO HIGHER THAN
EXPECTED DIP.
- NO ISSUES DRILLING AHEAD FROM FAULT
CROSSING AT 13165' MD TO 13512' MD
-GAS WATCH: AVERAGE BACKGROUND = 160
UNITS, MAXIMUM = 220 UNITS
- PUMPED 35 BBL HI -VIS SWEEP AT 13046' MD
WITH MINIMAL INCREASE IN CUTTINGS
05.30 - O630 1.00 DRILL N 13,525.00 PROD1 BACKREAM ONE STAND AND CIRCULATE
HOLE CLEAN WHILE DISCUSSING PLAN
FORWARD WITH ANCHORAGE TEAM. DUE TO
LACK OF ANY HOLE ISSUES, DECISION MADE
TO DRILLAHEAD TO TSGR IN ORDER TO
DETERMINE DIP INFORMATION PAST FAULT
#1.
- 300 GPM, 2100 PSI, 150 RPM, 13 KFT-LBS
0630 - 0730 1.00 DRILL N 13,525.00 PRODI DIRECTIONAL DRILL6-1/8"PROD HOLE
LATERAL SECTION IN SHUBLIKAND SAG
RIVER FORMATIONS FROM 13512' MD TO
13572 MD
- SECOND TSHU POINT ENCOUNTEREDAT
13559' MD, CALCULATED DIP OF -3%
- 300 GPM, 2100 PSI, 150 RPM, 14 KFT-LBS, 12
KLBS WOB
Printed 8/8/2017
11:19:44AM 'All depths reported in Drillers Depths`
North America - ALASKA - BP
Operation Summary Report
Comirron Well Name: J-28 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Data. 6/162017 Eno Date: 7/8/2017 X3 -0184N -C: (8,648,145.00 )
Rig Contractor PARKER DRILLING CO.
Active datum: J-28AActual @85.87usR (above Mean Sea Le
Date From -To Hrs Task
_. (hr)
09:00 - 10:00 1 1.00 1 DRILL
10:00 - 11:00 I 1.00 1 DRILL
11:00 - 12:00 I 1.00 1 DRILL
12:00 - 13:00. 1.00 1 DRILL
13:00 - 15:30 - 2.50 DRILL
I
1530 - 16:00 0.50 DRILL
I I I
Mme: 5/17/1987 12:00 OOAM
Code NPT Total Depth Phase
(usft)
N 13,52500 PROD1
IN 13,525.00 PROD1
I
N 13,525.00 PROD1
� I
I
N 13,525.00 PROD1
N 13,525.00 PROD?
N 13,52500 PROD1
N 13,525.00 PROD1
Printed 8/8/2017 111 19 44A *AII depths reported in Drillers Depths*
Page 39 of 47
Rig Release. 7/15/2017
BPUOI: USA00000397
Description of Operations
BACKREAM OUT OF HOLE WITH 6-1/8" PROD
HOLE RSS ASSEMBLY FROM 13572' MD TO
12715' MD TO CONFIRM NO HOLE ISSUES
WHILE WAITING ON PLAN FORWARD.
DECISION MADE TO PERFORM OPEN HOLE
SIDETRACK DUE TO POTENTIAL KINGAK
INSTABILITY.
- 300 GPM, 2100 PSI, 150 RPM, 6-10 KFT-LBS
- PULLING SPEED = 30 FPM
RUN IN HOLE WITH 6-1/8" PROD HOLE RSS
ASSEMBLY FROM 12715' MD TO 13572' MD ON
ELEVATORS
- NO ISSUES RUNNING IN HOLE _
DIRECTIONAL DRILL 6-1/8" PROD HOLE
LATERAL SECTION IN SAG RIVER
FORMATIONS FROM 13572' MO TO 13611' MD
(P81 TD)
- DRILLED ADDITIONAL FOOTAGE PAST FAULT
AND EXPOSED KINGAK TO HELP DEVELOP
NEW DIRECTIONAL PLAN 8 IDENTIFYA
MORE ACCURATE DIP CALCULATION FOR
THE UPCOMING OPEN HOLE SIDETRACK
- 300 GPM, 2100 PSI, 150 RPM, 14 KFT-LBS, 12
KLBS WOB
- MW IN/OUT = 8.6 PPG 18.6+
- SLIGHT SEEPAGE LOSSES TO FORMATION
WHILE DRILLING AHEAD (5-10 BPH)
- SURVEY EVERY STAND FOR DOGLEGS <
5°/100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL.
- GAS WATCH: AVERAGE BACKGROUND =160
UNITS, MAXIMUM = 330 UNITS.
- ACTUAL DRILLING TIME FOR 24 HOUR
PERIOD = 7.6 HOURS.
-JAR HOURS =52.3 HOURS
- 24 HOUR FLUID LOSS: 147 BBLS.
CIRCULATEAND CONDITION HOLE WHILE
WAITING ON DIRECTIONAL PLAN AND OCN
FOR OPEN HOLE SIDETRACK
- 300 GPM, 2150 PSI
PUMP OUT OF HOLE WITH 6-1/8" PROD HOLE
RSS ASSEMBLY FROM 13516' MD TO 12762'
MD WHILE WAITING ON DIRECTIONAL PLAN
AND 01 FOR OPEN HOLE SIDETRACK
- 300 GPM, 2000 PSI
- PULLING SPEED = 65 FPM
MAD PASS OUT OF HOLE WITH 6-1/8" PROD
HOLE RSS ASSEMBLY FROM 12762' MD TO
12385' MD WHILE WAITING ON DIRECTIONAL
PLAN AND 01 FOR OPEN HOLE SIDETRACK
- LOGGING PERFORMED
OPPORTUNISTICALLY FOR BUILD MORE
COMPLETE DATA SET
- 300 GPM, 2050 PSI, 150 RPM, 9 KFT-LBS
- PULLING SPEED = 225 FPH
RUN IN RUN IN HOLE WITH 6-1/8" PROD HOLE
RSS ASSEMBLY FROM 12385' MD TO OPEN
HOLE SIDETRACK DEPTH OF 12700' MD ON
ELEVATORS
- NO ISSUES RUNNING IN HOLE
North America -ALASKA - BP Page 40 of 47
Operation Summary Report
Common Well Name: J-28
NPT
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
-TIME DRILLACCORDING TO APPROVED
Start Date: 6/16/2017 End Date: 7/8/2017
%3 -0184N -C: (8,648,145.00)
SIDETRACK (12700' MD) WHILE WAITING ON
LEVEL 2 CON #3
DIRECTIONAL PLAN AND OCN FOR OPEN
Project: Prudhoe Bay --
Site: PB J Pad
Rig Name/No.: PARKER 272
30' INTERVAL AT SIDETRACK 3 TIMES
Spud DaWime: 5/17/1987 12:00:OOAM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
- TRENCH 30' INTERVAL FROM 12670' MD TO
BPUOI: USA00000397
Active datum: J-28AActual @85.87us8 (above
Date From -To Him
(h0
16:00 - 21:00 1 5.00
0000 3.00
Task Code
NPT
I Total Depth Phase Description of Operations
(usR)
1 13,525 00 PRODI TRENCH AT KICKOFF POINT FOR OPEN HOLE
STKOH N
-TIME DRILLACCORDING TO APPROVED
SIDETRACK (12700' MD) WHILE WAITING ON
LEVEL 2 CON #3
DIRECTIONAL PLAN AND OCN FOR OPEN
HOLE SIDETRACK
30' INTERVAL AT SIDETRACK 3 TIMES
I- 250 GPM, 1560 PSI, 100-125 RPM, 9 KFT-LBS
1
- ROTATE WITH RIBS OFF AT KICKOFF POINT
- TRENCH 30' INTERVAL FROM 12670' MD TO
- BEGIN TIME DRILLING AT 0.5 FPH PER OCN
12700' MD, 100% STEER FORCE, -180° TFO
1
STKOH N
1 13,52500 PRODI TIME DRILLFOR OPEN HOLE SIDETRACK
7/4/2017 X00:00 - 11:30 11.50 STKOH
1130 - 1400 1 2.50 1 STKOH
14:00 - 16'.30 2.50
STKOH
FROM 12700' TO 12702' MD AT MIDNIGHT
Printed 6/6/2017 11:19:44AM •AII depths reported in Drillers Depths'
-TIME DRILLACCORDING TO APPROVED
LEVEL 2 CON #3
- DOWNLINK AUTOTRAK RIBS OFF AND REAM
30' INTERVAL AT SIDETRACK 3 TIMES
- ROTATE WITH RIBS OFF AT KICKOFF POINT
AT 100 RPM, 250 GPM FOR 30 MIN
- BEGIN TIME DRILLING AT 0.5 FPH PER OCN
TIME DRILL PER THE FOLLOWING SCHEDULE
FROM OCN#19:
2 HRS: 1/2 FT/HR
3 HRS: 1 FT/HR
3 HRS: 2 FT/HR
3 HRS:4 FT/HR
1 HRS: 8 FT/HR
TOTAL 30'IN 12 HRS
N
13,611.00 PROD1 TIME DRILL FOR OPEN HOLE SIDETRACK
FROM 12702' MD TO 12746' MD PER OCN #3
- 250 GPM, 1575 PSI, 100 RPM, 8 KFT-LBS TO
- MW IN/OUT 8.6 PPG
TIME DRILLACCORDING TO THE FOLLOWING
SCHEDULE:
-2 HRS 0.5 FPH
- 3 HRS @ 1 FPH
-3 HRS @2 FPH
-3 HRS @4 FPH
I HR @ 8 FPH
-IHR@12 FPH
_ -0.5 HRS@20 FPH
N
13,611.00
PROD1 ATTEMPTTO DRILLAHEAD IN 6-1/8"
PRODUCTION HOLE FROM 12746' MD TO
12856' MD (OPEN HOLE SIDETRACK)
- 300 GPM, 2100 PSI, 100 RPM, 8 KFT-LBS TO
- OBSERVE ZERO WOB AND NO DEPARTURE
IN INCLINATION FROM ORIGINAL WELLBORE,
DETERMINED THAT OPEN HOLE SIDETRACK
ATTEMPT WAS UNSUCCESSFUL
- DISCUSS RESULTS WITH ANCHORAGE
TEAM, DECISION MADE TO PULLOUT OF
HOLE AND ATTEMPT OPEN HOLE SIDETRACK
_
IN BUILD SECTION OF WELL
N
+13,611.+00PFROD1
PULL OUT OF HOLE WITH 6-1/8" PROD
DRILLING ASSEMBLY FROM 12858' MD TO
11300' MO ON ELEVATORS
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM, STATIC
- MW IN/OUT 8.6 PPG
- MONITOR WELL VIATRIP TANK GOOD
DISPLACEMENT
i- NO ISSUES PULLING OUT OF HOLE
Printed 6/6/2017 11:19:44AM •AII depths reported in Drillers Depths'
North America - ALASKA - BP Page 41 of 47
Operation Summary Report
Common Wall Name: J-28
18'.30
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/16/2017 End Date: 7/8/2017
X3 -0184N -C: (8,648,145.00)
13,611.00
7/5/2017
00:00
Project: Prudhoe Bay - — _
---
- Site: PB J —Pad --
Rig Name/No.: PARKER 272
Spud DateRme: 5/17/1987 12:00:OOAM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-28AActual @85.87usft (above Mean Sea Level)
Date From - To Hrs Task i Code I NPT Total Depth
(hr) (use
16:30 - 18:30 2.00 STKOH N 13,611.00
01:00 - 08:00 7.00 STKOH Nor 13,611.00
uu:Uu Ua:3u 1.50
STKUH
N 13,611.00
Phase
18'.30
- 0000
550
STKOH
N
13,611.00
7/5/2017
00:00
- 01:00
1.00
STKOH
N �_�13,611A0
01:00 - 08:00 7.00 STKOH Nor 13,611.00
uu:Uu Ua:3u 1.50
STKUH
N 13,611.00
Phase
Description of Operations
PROD1
TRENCH AT KICKOFF POINT FOR OPEN HOLE
SIDETRACK (11345' MD) WHILE WAITING ON
DIRECTIONAL PLAN AND OCN FOR OPEN
HOLE SIDETRACK
- VERBAL APPROVAL GIVEN FOR TRENCHING
AND 30' OF TIME DRILLING
- 250 GPM, 1515 PSI, 125 RPM, 8 KFT-LBS
- TRENCH 50' INTERVAL FROM 11 295'MD TO
11 345'MD, 100% STEER FORCE, -180° TFO
- OBSERVE BIT START TO TAKE WEIGHT AT
11326' MD ON FIRST PASS, DECISION MADE
TO PROCEED WITH OPEN HOLE SIDETRACK
WHILE OPPORTUNITY PRESENTS ITSELF
- SIDETRACK WELL FROM 11326' MD TO
11 345'MOAT BOTTOM OF STAND
- CONTACTANCHORAGE TEAM TO DISCUSS
RESULTS OF SIDETRACKING OPERATION.
WAIT ON NEW DIRECTIONAL PLAN AND
APPROVED OCN BEFORE DRILLING AHEAD. _
PROD1
WAIT ON NEW DIRECTIONAL PLAN AND
APPROVED OCN PRIOR TO DRILLING AHEAD
- REAM FULL STAND 3 TIMES TO CONFIRM
RE-ENTRY INTO OPEN HOLE SIDETRACK; 250
GPM, 1500 PSI, 60-100 RPM, 7 KFT-LBS TO
- RECIPROCATE FULL STAND WHILE WAITING
FOR PLAN FORWARD', 250 GPM, 1500 PSI _
PROD?
CONTINUE TO WAIT ON NEW DIRECTIONAL
PLAN AND APPROVED OCN PRIOR TO
DRILLING AHEAD
- RECIPROCATE FULL STAND WHILE WAITING
FOR PLAN FORWARD, 250 GPM, 1470 PSI
PROD?
DIRECTIONALLY DRILLAHEAD IN 6-1/8"
PRODUCTION HOLE PER APPROVED OCN #4
AND DIRECTIONAL PLAN WP12; FROM 11,341'
MD TO 11,7581(87061 TVD)
- INSTANTANEOUS ROP = 30-120 FPH
- 300 GPM, 2009 PSI ON/OFF BOTTOM, 150
RPM, 8/9 KFT-LBS TRO 0 WOFF BTM, 2-8 KLBS
WOB
- MW IN/OUT = 8.6 PPG
- SLIGHT SEEPAGE LOSSES TO FORMATION
WHILE DRILLING AHEAD (<5 BPH)
- SURVEY EVERY STAND FOR DOGLEGS -
5/100'
- SURVEY EVERY 30' FOR DOGLEGS > 5-1100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEEDACTIVE FOR ENTIRE DRILLING
INTERVAL
- GAS WATCH: AVERAGE BACKGROUND = 125
UNITS, MAXIMUM = 500 UNITS
PROD1
TROUBLESHOOT OBSERVED 75-100 PSI
PRESSURE DROP WHILE DRILLING 6-1/8"
PROD HOLE
- PRESSURE TEST SURFACE EQUIPMENT
- NO ISSUES FOUND WITH SURFACE
Pnnted B/B/2017 11.19.44AM 'All depths reported in Drillers Depths'
Printed 8/8/2017 11:19:44AM *All depths reported in Drillers Depths*
North America - ALASKA - BP
Page 42 of 47
Operation Summary Report
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 6/16/2017 End Date: 7/8/2017
X3-0184N-C:(8,648,145.00)
Project: Prudhoe Bay
She: PB J Patl
Rig Name/No.: PARKER 272
Spud Daternme: 5/17/1987 12:00:OOAM
I Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
_ _
Active datum: J-28AActual @85.87usft (above Mean Sea Level)
Data
From-To Hrs
Task Code NPT Total Depth Phase
Description of Operations
_.- (hr)
_ (ustt)
09:30 - 13:00 3.50
.... _
STKOH N 13,611.00 PROD?
PULL OUT OF THE HOLE ON ELEVATORS
LOOKING FOR A WASHOUT IN THE DRILL
STRING FROM 11,758' MD TO 8206' MD
- MONITOR WELL FOR 10 MIN: STATIC
- PU 185K, SO 133K AT 11,758' MD
- MW IN/OUT = 8.6 PPO
- 1040K OVER PULLS FROM 11,500' MD TO
11,153'MD
- BACKREAM 1 STAND FROM 11,500' MD TO
11,406' MD AT 60 RPM, 8K FT-LBS TORQUE,
300 GPM, 1650 PSI
- FOUND WASHOUTAT 8206' MD, IN THE SLIP
SETAREA ON A JOINT
- LAY DOWN AND REPLACE DAMAGED JOINT
- CIRCULATE AT 300 GPM, 1975 PSI AND
_
113:00 - 15:30 2.50
STKOH N 13,611.00 PROD1
VERIFY STRING INTEGRITY
RUN IN THE HOLE ON ELEVATORS FROM
8206' MD TO 11,710' MD
I
- MONITOR WELL FOR 10 MIN: STATIC
- FILL PIPE EVERY 2000' MD
j
-MW IN/OUT =8.6 PPG
- WASH DOWN LAST 48' TO BOTTOM AT
15:30 - 00:00 8.50
STKOH N 13,877.00 PROD1
11,758' MD WITH NO ISSUES
DIRECTIONALLY DRILLAHEAD IN 6-1/8"
PRODUCTION HOLE PER APPROVED OCN #4
AND DIRECTIONAL PLAN WP12; FROM 11,758'
MD TO 12,101' (8667' TVD)
1
INSTANTANEOUS ROP =30-120 FPH
- 300 GPM, 2050-2070 PSI ON/OFF BOTTOM,
150 RPM, 11/9 KFT-LBS TRQ ON/OFF BTM,
8-12 KLBS WOB
- MW IN/OUT = 8.6/8.7 PPG
- SLIGHT SEEPAGE LOSSES TO FORMATION
WHILE DRILLING AHEAD (<5 BPH)
- SURVEY EVERY STAND FOR DOGLEGS <
5°/100'
- SURVEY EVERY 30' FOR DOGLEGS > 5°/100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEEDACTIVE FOR ENTIRE DRILLING
INTERVAL
- GEOSTEERING PER WELLSITE GEOLOGIST
WITH NO ISSUES
- GAS WATCH: AVERAGE BACKGROUND = 125
UNITS, MAXIMUM = 500 UNITS
Printed 8/8/2017 11:19:44AM *All depths reported in Drillers Depths*
North America -ALASKA - BP
Operation Summary Report
Common Well Name: J-28
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/162017 End Date: 7/8/2017
AFE No
(8,648,145.00)
Page 43 of 47
Klg NaMNO.: PARKER 272 1 Spud DateRme: 5/17/1987 12:00:OOAM
Rig Release: 7/152017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-28AActual @85.e7usft (above Mean Sea Level)
Date
From - To Hrs Task Code NPT Total Depth
Phase Description of Operations
(hr) (usiry 1
7/6/2017 00:00 - 14:30 14.50 STKOH N 13,611.00
PROD1 DIRECTIONALLY DRILLAHEAD IN 6-1/8"
PRODUCTION HOLE PER APPROVED OCN #4
AND DIRECTIONAL PLAN WP12; FROM 12,101'
MD TO 13,166' (8686' TVD)
- 1065' IN 14.5 HRS = 73.4 FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP = 30.120 FPH
- 300 GPM, 2200 PSI ON/OFF BOTTOM, 150
RPM, 11/10 KFT-LBS TRQ ON/OFF BTM, 8-12
KLBS WOB
- MW IN/OUT = 8.618.6 PPG
- SLIGHT SEEPAGE LOSSES TO FORMATION
WHILE DRILLING AHEAD (<5 BPH)
1
- SURVEY EVERY STAND FOR DOGLEGS <
5°/100'
- SURVEY EVERY 30' FOR DOGLEGS> 5°/100'
- NO BACKREAMING AT CONNECTIONS
1
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GEOSTEERING PER WELLSITE GEOLOGIST
WITH NO ISSUES
- GAS WATCH: AVERAGE BACKGROUND = 250
UNITS, MAXIMUM = 950 UNITS
- ENCOUNTERED FAULT#1 AT 13,180' MD
(8686' TVD) AND FAULTED INTO SAG RIVER
J�
FORMATION; NO ISSUES WITH FAULT
14:30 - 00:00 9.50 STKOH P 13,739.00
PROD? DIRECTIONALLY DRILLAHEAD IN 6-1/8"
PRODUCTION HOLE FROM 13,166' MD TO
13,739' MD (8657' TVD)
- 573' IN 9.5 HRS = 60.3 FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP= 30.120 FPH
- 300 GPM, 2210 PSI ON/OFF BOTTOM, 150
RPM, 12/11 KFT-LBS TRQ ON/OFF BTM, 8-12
KLBS WOB
-MW IN/OUT =8.6/8.7 PPG
- SLIGHT SEEPAGE LOSSES TO FORMATION
WHILE DRILLING AHEAD (<5 BPH)
- SURVEY EVERY STAND FOR DOGLEGS <
5°/100'
- SURVEY EVERY 30' FOR DOGLEGS > 5-1100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GEOSTEERING PER WELLSITE GEOLOGIST
WITH NO ISSUES
- GAS WATCH: AVERAGE BACKGROUND = 300
'
UNITS, MAXIMUM = 2150 UNITS
- AVERAGE BACKGROUND GAS INCREASED
TO -650 UNITS WITH A PEAK OF 2150 UNITS
-
FROM 13,290' MD TO 13,500' MD
11'19"44AM 'All depths reported in Drillers Depths'
North America -ALASKA - BP
Operation Summary Report
Common Well Name: J-28
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/16/2017 End Date: 7/8/2017
Page 44 of 47
AFE No
X3-0184N-C:(8,648,145.00I
vri Hruonoe Nay I Site: PB J Pad
Rig Name/No.: PARKER 272 Spud DateRms: 5/17/1987 12:00:OOAM Rig Release: 7/15/2017
Rig Contractor. PARKER DRILLING CO. BPUOI: USA00000397
Active datum:
Date
7012017
From - To
12:00 - 00:00
Love Mean Sea Leve0
Him Task Code I NPT Total Depth
12.00 STKOH
Description of Operations
14,337.00 PROD1 DIRECTIONALLY DRILLAHEAD IN 6-1/8"
PRODUCTION HOLE FROM 13,739' MD TO
14,337 MD (8641' TVD)
- INSTANTANEOUS ROP= 30-100 FPH
- 300 GPM, 2316 PSI ON/OFF BOTTOM, 150
RPM, 13/12 KFT-LBS TRQ ON/OFF BTM, 8-12
KLBS WOB
PU 192K, SO 128K, ROT 151K
- MW IN/OUT = 8.718.7 PPG
- LOSSES TO FORMATION WHILE DRILLING
AHEAD (10-12 BPH)
- SURVEY EVERY STAND FOR DOGLEGS <
5"/100'
- SURVEY EVERY 30' FOR DOGLEGS > 5°1100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEEDACTIVE FOR ENTIRE DRILLING
INTERVAL
- GEOSTEERING PER WELLSITE GEOLOGIST
WITH NO ISSUES
- GAS WATCH: AVERAGE BACKGROUND = 200
UNITS, MAXIMUM= 1250 UNITS
- SLOWED ROP TO 50 FPH FROM 13,800' MD
TO 13,900' MD FOR INCREASED DIRECTIONAL
CONTROL
P 14,937.00 PROD1 DIRECTIONALLY DRILLAHEAD IN 6-118"
PRODUCTION HOLE FROM 14,33T MD TO
14,937 MD (8634' TVD)
- INSTANTANEOUS ROP= 30-100 FPH
- 300 GPM, 2330 PSI ON/OFF BOTTOM, 150
RPM, 14/13 KFT-LBS TRQ ON/OFF BTM, 12
KLBS WOB
- PU 199K, SO 123K, ROT 150K
- MW IN/OUT = B.7/8.7 PPG
- INCREASE IN LOSSES TO FORMATION
WHILE DRILLING AHEAD
- LOSSES OF 14-20 BPH UP TO 22:00 HRS
- LOSSES OF 44 BPH FROM 22:00-23:00 HRS
(14,815' MD)
- LOSSES OF 20 BPH FROM 23:00 -MIDNIGHT
- SURVEY EVERY STAND FOR DOGLEGS <
5°/100'
- SURVEY EVERY 30' FOR DOGLEGS > 5°1100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GEOSTEERING PER WELLSITE GEOLOGIST
WITH NO ISSUES
- GAS WATCH: AVERAGE BACKGROUND = 200
UNITS, MAXIMUM =1150 UNITS
- REDUCE ROP TO 50 FPH AS REQUIRED FOR
DIRECTIONAL CONTROL
Pnnted 8/812017 11:19:44AM `All depths reported in Drillers Depths'
North America -ALASKA - BP Page 45 of 47
Operation Summary Report
Common Well Name: J-28 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 6/162017 End Date: 7/8/2017 X3 -0184N -C: (8,648,145.00)
Project: Prudhoe Bay Site: PB J Pad
Rig NameMo.: PARKER 272 Spud DateRme: 5/17/1987 12:00:00AM Rig Release: 7/152017
Rig Contractor: PARKER DRILLING CO. BPUOI.. USA00000397
Active datum, J -28A Actual (JD85.87usft (above Mean Sea Level)
Date
From - To Him
Task Code NPT Total Depth Phase Description of Operations
STKOH P 15,037.00 PRODi DIRECTIONALLY DRILLAHEAD IN 8-1/8"
7/8/2017
00:00 - 01:00 1.00
PRODUCTION HOLE FROM 14,937' MD TO
15,037 MD
- INSTANTANEOUS ROP= 30-100 FPH
- 300 GPM, 2330 PSI ON/OFF BOTTOM, 150
RPM, 14/13 KFT-LBS TRO ON/OFF BTM, 12
KLBS WOB
- PU 11 SO 123K, ROT 150K
- MW IN/OUT = 8.7/8.7 PPG
- LOSSES TO FORMATION WHILE DRILLING
' AHEAD 30 BPH
- SURVEY EVERY STAND FOR DOGLEGS <
5"/100'
- SURVEY EVERY 30' FOR DOGLEGS - 5°/100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
- INTERVAL
- GEOSTEERING PER WELLSITE GEOLOGIST
WITH NO ISSUES
- GAS WATCH: AVERAGE BACKGROUND = 150
UNITS, MAXIMUM =450 UNITS
- REDUCE ROP TO 50 FPH AS REQUIRED FOR
01:00 - 03:00 1 2.00 1 STKOH I N
- 16:30 I 13.50 STKOH I P
15,037.00
15,750.00
PRODi TROUBLESHOOT FAULTY READINGS ON
MWD PRESSURE TRANSDUCER
- REPLACE TRANSDUCER AND ISSUE STILL
PRESENT
- CALL OUT ELECTRICIAN AND
TROUBLESHOOT WIRING
- ELECTRICIAN FOUND A CORRODED
TERMINAL ON A PLUG COMING OUT OF THE
J -BOX
- REPLACE CONNECTION
- RECIPROCATE PIPE SLOWLY WHILE
TROUBLESHOOTING AND REPAIRING
CONNECTION.
PROCI DIRECTIONALLY DRILLAHEAD IN 6-1/8"
PRODUCTION HOLE FROM 15,03T MD TO
SECTION TDAT 15,750' MD (8608' TVD)
- 713' IN 13.5 HRS = 52.8 FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP= 30-100 FPH
- 300 GPM, 2385/2380 PSI ON/OFF BOTTOM,
150 RPM, 14/12 KFT-LBS TRQ ON/OFF BTM, 12
KLBS WOB
- MW IN/OUT = 8.7/8.7 PPG
- LOSSES TO FORMATION WHILE DRILLING
AHEAD 15-20 BPH
- SURVEY EVERY STAND FOR DOGLEGS <
5'/100'
- SURVEY EVERY 30' FOR DOGLEGS - 5°/100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING
INTERVAL
- GEOSTEERING PER WELLSITE GEOLOGIST
WITH NO ISSUES
- PUMP 40 BBL40 PPB DRILLAHEAD PILLAT
15,400' MD - NO CHANGE IN LOSS RATE
GEO TEAM CALLED PRODUCTION SECTION
TD EARLY AT 15,750' MD WITH 2650' OF SAG
RIVER FORMATION DRILLED.
Panted e/6/2017 11:19:44AM 'All depths reported in Drillers Depths'
Printed 6/8/2017 11:19:44AM "All depths reported in Drillers Depths'
North America - ALASKA -
BP
Page 46 of 47
Operation Summary Report
Common Well Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6/162017
End Date: 7/8/2017
X3 -0164N -C: (8,648,145.00)
Project: Prudhoe Bay
Site: PB J Pad
Rig Name/No.: PARKER 272
Spud Data/Time: 5/17/1987 12:00:OOAM
Rig Release: 7/15/2017
Rig Contractor. PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J -28A Actual @85.87usft (above Mean Sea Level)
Date
From -To
Him
_
Task Code NPT
Total Depth
Phase
Description of Operations
(usft)
116:30 - 1900
2.50
STKOH P
15,750.00
PROD?
CIRCULATE WELL CLEAN AT TD
PUMP 40 BBL 40 PPB DRILL AHEAD PILLAT
15,400' MD - NO CHANGE IN LOSS RATE
'- CIRCULATE 2X BOTTOMS UP STROKES
- 300 GPM, 2350 PSI, 100 RPM, 12 KFT-LBS
TRQ
-RECIPROCATE 90'
- TAKE SLOW PUMP RATES
- MONITOR WELL FOR 10 MIN, 4-6 BPH STATIC
_
LOSS RATE
,19:00 - 21:30
250
STKOH P
15,750.00
PROD1
PULL OUT OF THE HOLE ON ELEVATORS
FROM 15,750' MD TO 11,750' MD
- PULLED INTO CUTTINGS BED IN BUILD
SECTION OF THE WELL AT 11,750' MD
-
- 15-25K OVERPULL, OBSTRUCTION MOVED
UP HOLE SEVERAL FEET WITH EACH
ATTEMPT
21:30 - 22:30
1.00
STKOH P
15,750.00
PROD1
CIRCULATE HOLE CLEAN WITH 1X BOTTOMS
UPSTROKES
- 300 GPM, 2000 PSI, 80-100 RPM, 10-12
KFT-LBS TRQ
- RECIPROCATE 90'
- NO OBSERVABLE CHANGE AT SHAKERS AT
BOTTOMS UP
2230 - 23:00
0.50
STKOH P
15,750.00
PROD,
PULL OUT OF THE HOLE ON ELEVATORS
FROM 11,750' MD TO 10,650' MD, ABOVE 7"
LINER SHOE
- MONITOR WELL FOR 10 MIN, 46 BPH STATIC
LOSS RATE
PULLING AT 51 FPM
2300 - 23:30
0.50
STKOH P
15,750.00
PROD,
PERFORM WEEKLY BORE FUNCTION TEST
- MONITOR WELL FOR 10 MIN, 46 BPH STATIC
LOSS RATE
- FUNCTION UPPER RAMS, LOWER RAMS
ANDANNULAR
,23:30 - 00:00
0.50
STKOH P
15,750.00
PROD1
_
SERVICE TOP DRIVE AND BLOCKS
CHANGE OUT WASHPIPE
7/9/2017 00:00 - 01:30
1.50
STKOH P
15,750.00
PRODt
SLIP AND CUT 152'(19 WRAPS) OF DRILL LINE
CALIBRATE BLOCKS
01:30 - 04:30
300
., STKOH 1
15,750.00
PROD,
_
RUN IN THE HOLE TO TO ON ELEVATORS,
FROM 10,650' MD TO 15,750' MD
- MONITOR WELL FOR 10 MIN, 46 BPH STATIC
LOSS RATE
- RUN IN THE HOLE AT 90 FPM
- 13,386' MD: TOOK 10K, PICKED UPAND DID
NOT SEEANYTHING COMING DOWN THE
_
SECOND TIME
04:30 06:30
�—
2.00
STKOH P
15,750.00
PROD,
_
STAGE UP PUMPS AND CIRCULATE 2X
BOTTOMS UP TO CLEAN THE HOLE AT TD
-
300 GPM, 2300 PSI, 120 RPM, 14 KFT-LBS
TRQ
RECIPROCATE PIPE 90'
06.30 - 09:30
3.00
STKOH P
15,750.00
PROD?
PULL OUT OF THE HOLE ON ELEVATORS
FROM 15,750' MD TO 10,650' MD, ABOVE 7"
LINER SHOE
-
MONITOR WELL FOR 10 MIN, 46 BPH STATIC
LOSS RATE
-
PULLAT 50-90 FPM
- NO ISSUES NOTED ON FINALTRIP OUT
Printed 6/8/2017 11:19:44AM "All depths reported in Drillers Depths'
Printed 8/6/2017 11 19:44AM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 47 of 47
Operation Summary Report
Common Wall Name: J-28
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 6116/2017 End Date: 702017
X3 -0184N -C: (8,648,14&00)
Project: Prudhoe Bay
Site: PB J Pad
Rig Name/No.: PARKER 272
Spud Dohme: 5/17/1987 12*00:OOAM
Rig Release: 7/15/2017
Rig Contractor. PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J -28A Actual @85.87us8 (ahove Mean Sea level)
Date From -To His
Task
Code NPT
Total Dept Phase
Description of Operations
(hr)
08:30 - 10:30 1.00
STKOH P 15,750.00 PROD1
CIRCULATE IX BOTTOMS UP AT THE 7" LINER
SHOE
- MONITOR WELL FOR 10 MIN, 4-6 BPH STATIC
LOSS RATE
- DROP THE BALL AND FUNCTION THE MOCS
TOOLOPEN
- CIRCULATE AT 600 GPM, 1500 PSI, 120 RPM
- RECIPROCATE 90'
- NO OBSERVABLE CHANGE AT SHAKERS AT
BOTTOMS UP
10:30 - 14:00 3.50
STKOH P 15,750.00 PROD?
PULL OUT OF THE HOLE ON ELEVATORS
I
FROM 10,650' MD TO 2900' MD, WITH THE
MOCS CIRCULATING SUBAT THE 7"LINER
TOP
- MONITOR HOLE FILL WITH THE TRIP TANK
_
STATIC LOSS RATE 4-6 BPH
14:00 - 15:00 1.00
STKOH P 15,750.00 PROD1
CIRCULATE THE UPPER HOLE SECTION
CLEAN
- CIRCULATE AT 600 GPM, 1200 PSI, 120 RPM
- PUMP 35 BBL HIGH -VIS SWEEP
- SIGNIFICANT INCREASE IN FINE CUTTINGS
BOTTOMS UP
15:00 - 16:00 1.00
STKOH P 15,750.00 PROD1
CONTINUE TO PULL OUT OF THE HOLE ON
ELEVATORS FROM 2900' MD TO THE TOP OF
THE BHAAT 210' MD
- MONITOR HOLE FILL WITH THE TRIP TANK
STATIC LOSS RATE 4-6 BPH
18:00 - 18:00 2.00
1
I
_
STKOH P 15,750.00 PROD1
LAY DOWN 6-1/8" DRILLING ASSEMBLY
- MONITOR WELL FOR 10 MIN, 4-6 BPH STATIC
LOSS RATE
- LAY DOWN COLLARS TO THE PIPE SHED
-HANDLE SOURCES
-BITGRADE: 1 -1 -WT -A -X -I -NO -TD
- DOWNLOAD MEMORY DATA FROM MWD
TOOLS IN PIPE SHED
END OF J -28A RON EVENT
Printed 8/6/2017 11 19:44AM 'All depths reported in Drillers Depths'
Printed 8/82017 1120: 11AM *All depths reported in Drillers Depths*
North America - ALASKA - BP
Page 1 of 12
Operation Summary Report
Common Well Name: J-28
AFE No
Event Type. COM- ONSHORE (CON)
Start Date: 7/9/2017
End Date: 7/15/2017
X3 -0184N -C: (2,859,304.00)
Project: Prudhoe Bay -
Site: PB J Pad
Rig Name(No.: PARKER 272
Spud DateRme: 5/17/1987 12:00:00AM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-28AActual @85.87usR (above Mean Sea Level)
Date From- To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
7/9/201718:00
- 19:00
1.00
CASING
P
15,750.00 j RUNPRD
RIG UP TO RUN 41/7' HYD521 LINER
'— CLEAN AND CLEAR RIG FLOOR
'- MOBILIZE LINER RUNNING EQUIPMENT TO
RIG FLOOR
- RIG UP TONGS AND TORQUE TURN
EQUIPMENT
- VERIFY LINER, SHOE TRACKAND LINER
HANGER/PACKER IN PIPE SHED
19:00 - 19:30
0.50
CASING
P
15,750.00
RUNPRD
RIG SERVICE
- SERVICE AND INSPECT PIPE CAT
19:30 - 00:00 4.50
CASING P
15,750.00 RUNPRD
RUN 412", 13.5#/ 12.8#, 13CR HYD521
PRODUCTION LINER TO 3500' MD
- DUAL WEIGHT LINER; FIRST 75 JTS (2784')
13.5#, REMAINING 57 JTS (2334') 12.8#
- BAKER-LOK SHOE TRACK
- CHECK FLOATS, GOOD
- USE JET LUBE SEAL GUARD PIPE DOPE
(FF=1.0) ON ALL HYD521 CONNECTIONS
-TORQUE 41/2"13.5# HYD521 CONNECTIONS
TO 5000 FT -LBS
- TORQUE 41/2" 12.8# HYD521 CONNECTIONS
TO 4700 FT -LBS
- RUN 1 CENTRALIZER LOCKED DOWN 5'
FROM PIN ON FIRST SHOE TRACK JOINT
- RUN 1 CENTRALIZER LOCKED DOWN
MI D -JOINT ON SECOND SHOE TRACK JOINT
- RUN 1 FLOATING CENTALIZER W/ STOP
RINGS T FROM EACH END ON THIRD SHOE
TRACK JOINT
- RUN 2 FLOATING CENTRALIZERS ON
JOINTS 1 - 127 W/ STOP RINGS ON BOTH
ENDS AND IN THE MIDDLE
- RA TAG INSTALLED IN STOP RING AT 14,800'
MD
- FILL LINER EVERY ON THE FLY, TOP OFF
EVERY 10 JTS
PU 75K, SO 75K
Printed 8/82017 1120: 11AM *All depths reported in Drillers Depths*
Common Well Name: J-28
Event Type: COM- ONSHORE(CON)
Name/No.: PARKER 272
Date I From - To
North America - ALASKA- BP
Operation Summary Report
Start Dale. 7/9/2017 End Date: 7/15/2017
Site: PB J Pad
Spud DateRme: 5/17/1987 12:00:OOAM
X v Mean Sea Level)
Hrs Task Code NPT Total Depth Phase
(hr) (usR)
?.00 CASING P 15,75000 RUNPRD
tD
N
11:00 - 15'.00 4.00 CEMT P 15,750.00 RUNPRD
Printed 8/8/2017 11:20.11AM •All depths reported in Drillers Depths'
Page 2 of 12
AFE No
X3 -0184N -C:(2,859,304.00)
Rig Release:
Description of Operations
CONTINUE TO RUN 4 1/7', 13.5#! 12.6#, 13CR
HYD521 PRODUCTION LINER FROM 3500' MD
TO 5712' MD
- DUAL WEIGHT LINER; FIRST 75 JTS (2764')
13.5#, REMAINING 57 JTS (2334') 12.6#
- USE JET LUBE SEAL GUARD PIPE DOPE
(FF=1.0) ON ALL HYD521 CONNECTIONS
- TORQUE 4 1/2" 12.6# HYD521 CONNECTIONS
TO 4700 FT -LBS
- RUN 1 CENTRALIZER LOCKED DOWN 5'
FROM PIN ON FIRST SHOE TRACK JOINT
- RUN 1 CENTRALIZER LOCKED DOWN
MID -JOINT ON SECOND SHOE TRACK JOINT
-RUN 1 FLOATING CENTRALIZER W! STOP
RINGS T FROM EACH END ON THIRD SHOE
TRACK JOINT
- RUN 2 FLOATING CENTRALIZERS ON
JOINTS i -127 W! STOP RINGS ON BOTH
ENDS AND IN THE MIDDLE
- RA TAG INSTALLED IN STOP RING AT 14,800'
MD
- FILL LINER EVERY ON THE FLY, TOP OFF
EVERY 10 JTS
- PU 92K, SO 90K
PICK UP AND MAKE UP WEATHERFORD 7" X
5" LINER HANGERIPACKER ASSEMBLY
- CHANGE ELEVATORS
- VERIFY SHEAR SCREWS ON LINER HANGER
AND ON LINER TOP PACKER WITH
WEATHERFORD REPRESENTATIVE
- POUR HIGH -VIS MIX INTO PBR AND
RE -INSTALL BONNET.
RUN IN THE HOLE WITH 4 1/2" HYD521 LINER
ON 4" DRILL PIPE STANDS OUT OF THE
DERRICK
- FROM 5281' MD TO 15,750' MD
- RUNNING SPEED 90 FPM
- FILL PIPE EVERY 10 STANDS
- CIRCULATE 1.5X DRILL PIPE AND LINER
VOLUME AT 7" SHOE, 5 BPM, 639 PSI
- PU 193K, SO 126K
- MW IN/OUT = 8.7 PPG
- LOSSES WHILE RUNNING IN THE HOLE = 64
STAGE UP TO CEMENTING RATE TO
CONDITION HOLE PRIOR TO CEMENTING
- 2 BPM: 620 PSI, 2% RETURN FLOW
- 3 BPM: 788 PSI, 3% RETURN FLOW
- 4 BPM: 950 PSI, 4% RETURN FLOW
- 5 BPM: 1150 PSI, 6% RETURN FLOW
- RECIPROCATE PIPE 90' WHILE
CIRCULATING
- SPOT CEMENTERS AND RIG UP CEMENT
Common Well Name: J-28
Event Type: COM- ONSHORE (CON)
Prudhoe
Rig Contractor PARKER DRILLING CO.
Active datum: J-28AActual @85.87us8 (abov(
Date I From -To Him
1500
North America - ALASKA - BP
Operation Summary Report
Start Date: 7/9/2017 End Date: 7/15/2017
Site: PB J Pad
Spud Date/time: 5/17/1987 12:00:OOAM
;ea Level)
Task Code' NPT I Total Depth ! Phase
CEMT P ��� 15,750.00 RUNPRD
Printed 13/8/2017 11-.20: 11AM 'All depths reported in Drillers Depths'
Page 3 of 12
AFE No
X3 -0184N -C:(2,859,304.00)
Rig Release: 7/15/2017
BPUOI: USA00000397
Description of Operations
FOLLOWS:
- FILL LINES WITH WATER AND PRESSURE
TEST TO 4500 PSI FOR 5 MINUTES
- PUMP 30 BBLS OF 12 PPG MUOPUSH II
SPACER @ 5 BPM, 1000 PSI
- PUMP 120 BBLS OF 15.8 PPG CLASS G TAIL
@ 5 BPM, EXCESS VOLUME 30% (YIELD 1.17
CU.FT/SK), ICP 900 PSI, FCP 320 PSI
- WASH UP CEMENT IN LINES WITH PERF
PILL (NO CEMENT LEFT ON TOP OF DRILL
PIPE DART)
- RELEASE DART FROM WEATHERFORD
CEMENTHEAD
PERFORM DISPLACEMENT WITH
SCHLUMBERGER CEMENT UNIT; PUMP 94
BELS 8.6 PPG PERF PILL AND REMAINDER 8.6
PPG OUIKDRIL PER SLB CEMENTICS
- 94 BBLS DISPLACED AT 5 BPM: ICP 700 PSI,
FCP 1400 PSI
- SLOW DOWN FOR LATCH UPAND DISPLACE
12.3 BBLS AT 3 BPM: ICP 800 PSI, FCP 1100
PSI
OBSERVE FIRST DART LATCH AT 106.3 BBLS
(2.6 BBLS EARLY)
- INCREASE RATE TO 5 BPM AND DISPLACE
70.7 BBLS AT 5 BPM, ICP = 1200 PSI, 2200 PSI
- OBSERVE INDICATIONS OF PACKING OFF
AND APPROACHING HANGER SET
PRESSURE, STOP RECIPROCATING AND
LEAVE 4-1/2" SHOE 2' OFF BOTTOM
- REDUCE RATE TO 3 BPM AT 177 BBLS AWAY
(10 BBLS PRIOR TO CALCULATED PLUG
BUMP), ICP 1680 PSI, FCP 1740 PSI
- BUMP PLUG AT 185 BBLS AWAY (2 BBLS
EARLY); FINAL CIRCULATING PRESSURE
1740 PSI; INCREASE PRESSURE TO 2100 PSI,
CHECK FLOATS -GOOD
- TOTAL DISPLACEMENT VOLUME 185 BBLS
(MEASURED BY SCHLUMBERGER
MICROMOTION)
- RECIPROCATE 30'STROKE THROUGHOUT
JOB UNTIL SIGNS OF PACKING OFF WERE
SEEN
- TOTAL LOSSES FROM CEMENT EXIT SHOE
TO CEMENT IN PLACE: 15 BBLS
-CEMENT IN PLACE AT 16:49 HRS
- FIELD PICK TOP OF CEMENT = 10491' MD
(BASED ON VOLUME PUMPED, LOSSES, LIFT
PRESSURE, AND CEMENT CIRCULATED OFF
TOP OF LINER)
Common Well Name: J-28
Event Type: COM- ONSHC
Project: Prudhoe Bev
North America - ALASKA - BP Page 4 of 12
Operation Summary Report
AFE No
Start Date: 7/9/2017 End Date: 7/15/2017 X3 -0184N -C: (2,859,304.00)
5/17/1987
nig i,ennacrm: rnrtnuc urca.urvm GV.
SPUOI: USA00000397
NPT Total Dept
Phase Description of Operations
Active datum: J-28AActual 085.87use (above Mean Sea Level)
Date
From - To
Hrs
Task
Code
_
(hr)
- SET DOWN 70KAND CONFIRM HANGER SET
'17-.00 - 17:30
0.50
CASING
P
it
11730 - 1830
100
CASING
P
t
18:30 - 20.00
1.50
CASING
I I
P
2000 - 23'.30
3.50
CASING
P
EXCESS CEMENT AS SOON AS PRESSURE
I I
23:30 - 00:00
0.50 I
i
CASING
- PULL RUNNING TOOLABOVE TOP OF LINER
I
AND MARK NO-GO
i
- 14 BPM, 2930 PSI
7/11/2017 00:00 - 08:00
8.00
CLEAN
N
RUNPRD DISPLACE WELL TO CLEAN SEAWATER
- 12 BPM, 2400 PSI ICP, 2120 PSI FCP
08:00 - 09:30
1.50
CASING
P
11:20:11AM "AII depths reported in Drillers Depths'
SPUOI: USA00000397
NPT Total Dept
Phase Description of Operations
(use)
15,750.00
RUNPRD SET LINER HANGER AND LINE _TOP PACKER
PER WEATHERFORD REPRESENTATIVE
- INCREASE PRESSURE 704300 PSI AND
OBSERVE LINER HANGER SET
- SET DOWN 70KAND CONFIRM HANGER SET
- PICK UP AND EXPOSE DOG SUB
- SET DOWN WITH DOG SUB ON LINER TOP
WITH 50KAND 15 RPM TO SET LINER TOP
PACKER
- GOOD INDICATION ON LINER TOP PACKER
SET
- HOLD -100 PSI AND SLOWLY PICK UP TO
REMOVE RS PACK -OFF
- BRING ON PUMPS TO CIRCULATE OFF
EXCESS CEMENT AS SOON AS PRESSURE
BLEEDS OFF _
15,750.00
RUNPRD CIRCULATE OUT EXCESS CEMENT
- PULL RUNNING TOOLABOVE TOP OF LINER
AND MARK NO-GO
- 14 BPM, 2930 PSI
- 30 BBLS OF GOOD CEMENT BACK TO
SURFACE
15,750.00
RUNPRD DISPLACE WELL TO CLEAN SEAWATER
- 12 BPM, 2400 PSI ICP, 2120 PSI FCP
- TAKE SLOW PUMP RATES
- MONITOR WELL FOR 10 MIN - STATIC
15,750.00
RUNPRD PULL OUT OF THE HOLE ON ELEVATORS
FROM 10491' MD TO SURFACE
- MONITOR WELL WITH TRIP TANK GOOD
HOLE FILL.
SIMOPS:
- LOAD 2 7/8" PERF GUNS IN PIPE SHED
15,750.00
RUNPRD LAY DOWN WEATHERFORD LINER RUNNING
TOOL TO PIPE SHED
- ALL PARTS OF THE RUNNING TOOL INTACT
- GOOD INDICATION ON DOG SUB
-BUMPER SUB IS DAMAGED WITH A-3"
LONG x -3W' WIDE PIECE OF STEEL MISSING
- NOTIFY ODE, NS WOSAND WSUP.
15,750.00
RUNPRD DISCUSS DAMAGED BUMPER SUB / MISSING
METAL DOWNHOLE WITH ANCHORAGE TEAM
- LOCATE AND MOBILIZE TOOLS AND
ADDITIONAL 27/8" PAC DRILL PIPE FOR
CLEAN-OUT/DRIFT RUN
- RIG UP DOYON CASING TO MAKE UP PAC
PIPE
- CLEAN PITSAND TAKE ON SEAWATER
15,750.00
RUNPRD PRESSURE TEST 41/2" PRODUCTION LINER
- 250 PSI LOW 13500 PSI HIGH FOR 5 / 30
CHARTEDMINUTES
- TEST MET BP WELBORE INTEGRITY
TESTING CRITERIA
- LOST 30 PSI IN THE FIRST 15 MIN, LOST 10
PSI IN THE SECOND 15 MIN
- 9 BBLS TO PRESSURE UP, BLED BACK 9
BBLS
- WSUP APPROVED TEST
- SEE ATTACHED TEST CHART AND TEST
CRITERIA CALCULATOR
11:20:11AM "AII depths reported in Drillers Depths'
10:30 - 18:30 1 8.00 1 CLEAN I N
I
1830 - 21:00 2.50 CLEAN I N
21:00 - 21:30 1 0.50 j CLEAN I N
21.30 - 00:00 2.50 CLEAN N
7/12/2017 100:00 - 01:00 1.00
Printed 8/8/2017
CLEAN N
North America - ALASKA - BP
Page 5 of 12
WITH BORE SCOPE WHILE WAITING ON BHA
Operation Summary Report
Common Well Name: J-28
COMPONENTS AND APPROVED OCN.
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 7/9/2017 End Date: 7/15/2017
X3 -0184N -C: (2,859,304.00 )
Project: Prudhoe Bay
Site: PB J Pad
Rig Name/No.: PARKER 272
Spud DateTime: 5/17/1987 12:00:00AM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
iBPUOI: USA00000397
_
Active datum: J-28AActual @85.87usft (above Mean Sea Level)
Data From -To Hrs
Task Cade
NPT
Total Depth
I Phase
Description of Operators
_ _ (hr) _
WITH PIPE HANDLER UNTILABLE TO PASS
(usft)
THROUGH.
09:30 - 10:30 1.00
CLEAN
N
- PU 83K, SO 80K
15,750.0
PRD
NURO
_
DRAIN STACKAND INSPECT RAM CAVITIES
10:30 - 18:30 1 8.00 1 CLEAN I N
I
1830 - 21:00 2.50 CLEAN I N
21:00 - 21:30 1 0.50 j CLEAN I N
21.30 - 00:00 2.50 CLEAN N
7/12/2017 100:00 - 01:00 1.00
Printed 8/8/2017
CLEAN N
11:20:IIAM 'All depths reported in Drillers Depths'
WITH BORE SCOPE WHILE WAITING ON BHA
COMPONENTS AND APPROVED OCN.
_
NOTHING FOUND IN STACK.
15,750.00 RUNPRD
UNPLANNED CLEANOUT RUN: RUN IN THE
HOLE WITH 3.69" OD MILL/ CLEAN-OUT
ASSEMBLY TO 5343' MD, PICKING UP 2 -7/8 -
PAC DRILL PIPE SINGLES FROM PIPE SHED
PER APPROVED OCN 016.
- MINOR ISSUES GETTING DOWN THROUGH
7" LINER TOP: ROTATE STRING 114 TURN
WITH PIPE HANDLER UNTILABLE TO PASS
THROUGH.
-MW IN/OUT =8.5 PPG
- PU 83K, SO 80K
- MONITOR WELL WITH TRIP TANK -GOOD
DISPLACEMENT
15,750.00
RUNPRD
UNPLANNED CLEANOUT RUN: RUN IN THE
HOLE WITH CLEAN-OUT ASSY ON 4" DRILL
PIPE STANDS OUT OF THE DERRICK FROM
5343' MD TO 10,464' MD.
- PU 155K, SO 122K
- MONITOR WELL WITH TRIP TANK- GOOD
_
_DISPLACEMENT
15,750.00 RUNPRD
UNPLANNED CLEANOUTRUN: SLOWLY
ENTER 4 1/2" LINER WITH MILLAT 10,491' MD
AND CONTINUE IN TO 10,540' MD.
NO SIGN OF FISH AND DID NOT SEE LINER
TOP. PICK UP 30' ABOVE TOP OF LINER AND
CIRCULATE FOR 5 MIN PER OCN N6 IN AN
ATTEMPT MOVE FISH INTO LINER.
- 250 GPM, 2810 PSI
15.750.00 RUNPRD
UNPLANNED CLEANOUT RUN: CONTINUETO
RUN IN THE HOLE WITH CLEAN-OUTASSY
ON 4" DRILL PIPE STANDS OUT OF THE
DERRICK FROM 10,540' MD TO 14,791' MD.
- PU 185K, SO 120K
- MONITOR WELL WITH TRIP TANK- GOOD
DISPLACEMENT
15,750.00 RUNPRD
UNPLANNED CLEANOUT RUN: CONTINUE TO
RUN IN THE HOLE WITH CLEAN-OUTASSY
ON 4" DRILL PIPE STANDS OUT OF THE
DERRICK FROM 14,791' MD TO TAG PBTD AT
15,664' MD (8' DEEPER THAN TALLY)
- MONITOR WELL WITH TRIP TANK- GOOD
DISPLACEMENT
- PICKUP AND SLACKOFF WEIGHTS AT PBTD
= 202/121 KLBS
11:20:IIAM 'All depths reported in Drillers Depths'
Common Well Name: J-28
Event Type: COM- ONSH(
North America - ALASKA - BP
Operation Summary Report
(UUN) Stan Uate: 7/8/2017 End Date. 7/15/2017
Project: Prudhoe Bay
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLING CO.
Active datum: J-28AActual @85.87usft (above Mean
DatefTime:
Date From -To Him Task
(hr) —_ -
01:00 - 02:30 1.50 CLEAN
Page 6 of 12
AFE No
X3 0184N -C: (2,859,304.00)
Rig Release: 7/15/2017
Code NPT I Total Depth Phase Description of Operations
(usft)
N15,750.00 RUNPRD 'UNPLANNED CLEANOUT RUN: PICK UP TO
15,632' MD (25' ABOVE PBTD) AND CIRCULATE
02.30 - 08:30 6.00 CLEAN N
08.30 - 1100 2.50 CLEAN N T
11:00 - 16:00 1 5.00 1 CLEAN N
16:00 - 17:00 1 1.00 1 CLEAN I N
OUT OLD PERF PILL WITH NO PIPE
MOVEMENT PER OCN #6
I- 200 GPM, 3150 PSI
1- 41 BBLS BEFORE BOTTOMS UP, CEMENT
CONTAMINATED PERF PILL OBSERVED AT
I THE SHAKERS
-CONTAMINATED PERF PILL 8.6• PPG, 12.5
PH.
- CONTINUE TO CIRCULATE UNTIL CLEAN
SEAWATER BACK TO SURFACE; 1.5X
BOTTOMS UP
SIMOPS:
- LAY DOWN STANDS OF 4" DRILL PIPE
OFFLINE
15,750.00 RUNPRD UNPLANNED CLEANOUT RUN: LAY PERF PILL
IN LINER WHILE PULLING OUT OF THE HOLE
WITH 2-7/8" CLEANOUT ASSEMBLY FROM
PBTD AT 15656' MD TO TOP OF 4-1/2" LINER
AT 10495' MD.
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM (STATIC)
- SPOT 8.5 PPG PERF PILL ON BOTTOM, 230
GPM 3350 PSI
- PULLAT 90 FPM PUMPING AT 1.5 BBLS/
STAND TO LAY PERF PILL IN 4 1/2"
PRODUCTION LINER MATCHING METAL
DISPLACEMENT.
- INITIAL PICKUP WEIGHT OFF BOTTOM = 207
KLBS
SIMOPS:
- LAY DOWN STANDS OF 4" DRILL PIPE
OFFLINE WHILE PULLING OUT OF THE HOLE.
15,750.00 RUNPRD UNPLANNED CLEANOUT RUN: PULLOUTOF
THE HOLE WITH 2-7/8" CLEANOUT ASSEMBLY
ON ELEVATORS, RACKING BACK 4"
DRILLPIPE, FROM TOP OF 4-1/2" LINER AT
10495' MO TO PAC PIPE AT 5352' MD.
- PULLING SPEED = 250 FPM (NO LIMIT)
- SIMOPS: LAYING DOWN EXCESS DRILLPIPE
WITH OFFLINE EQUIPMENT _
15,75000 RUNPRD UNPLANNED CLEANOUT RUN: PULLOUTOF
THE HOLE WITH 2-7/8" CLEANOUT ASSEMBLY
FROM TOP OF PAC PIPE AT 5352' MD TO 1600'
MD, LAYING DOWN 2-7/8" PAC PIPE SINGLES
- PULLING SPEED = 250 FPM (NO LIMIT)
HELD PLANNING MEETING FOR UPCOMING
_RIG MOVE TO C -34B
15,750.00 RUNPRD UNPLANNED CLEANOUTRUN: PULLOUTOF
THE HOLE WITH 2-7/8" CLEANOUT ASSEMBLY
FROM 1600' MD TO SURFACE, RACKING BACK
-15 STANDS OF 2-7/8" PAC PIPE TO UTILIZE
FOR PERF GUN RUN.
I- PULLING SPEED = 950 FPM (Nn I (MITI,
11:20: 11AM *All depths reported in Drillers Depths'
Printed 8/8/2017 11:20:11AM *AA depths reported in Drillers Depths`
North America - ALASKA
- BP
Page 7 of 12
Operation Summary Report
Common Well Name: J-28
AFE No
Event Type: COM- ONSHORE (CON)
I Start Date: 7/9/2017 End Date:
7/15/2017
X3 -0184N -C: (2,859,304,00)
Project: Prudhoe Bay
Site: PB J Pad
Rig Name/No.: PARKER 272
Spud Daterrme: 5/17/1987 12:00:00AM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
I BPUOI: USA00000397
_ _
Active datum: J-28AActual @85.87usft (above Mean Sea Level)
_
Date From - To His
Task Code NPT Total Depth
Phase
Description of Operations
(hr)
(usft)
CLEAN N 15,750.00
:17:00 - 17:30 0.50
RUNPRD
UNPLANNED CLEANOUT RUN: BREAKDOWN
AND OFFLOAD 2-7/8" CLEANOUT TOOLS.
- NO WEAR OR INDICATION OF FISH ON MILL
NO SIGN OF BROKEN METAL PIECE FROM
BUMPER UMPER SUB(PURPOSE OF CLEANOUT RUN
17:30 - 18:30 1.00
PERFOB
P
15,750.00
OTHCMP
IRIGUPTORUNPERFGUNS
CONFIRM PERF GUN LAYOUT IN PIPE BARN.
18:30 - 22:00 3.50
PERFOB P 15,750.00
OTHCMP
PICK UP AND RUN IN THE HOLE WITH 2-7/8"
PERFORATING ASSEMBLY FROM THE PIPE
SHED TO 3641' MD
- PICK UPATOTAL OF 79 GUNASSEMBLIES
AND THE FIRING HEAD ASSEMBLY (3641.65'
OAL)
- PU 68K, SO 66K
- MONITOR WELL WITH TRIP TANK- GOOD
22:00 - 00:00 1 2.00
PERFOB P 15,750.00
OTHCMP
DISPLACEMENT
TRIP IN HOLE WITH 2-7/8" PERFORATING
ASSEMBLY ON 2-7/8" PAC DP
- PICK UP 5 JOINTS FROM THE PIPE SHED
AND RUN IN 15 STANDS OUT OF THE
DERRICK (50 JTS TOTAL)
- FROM 3461' MD AT TO 5216 MD.
RUNNING SPEED = 150 FPM
- PU 75K, SO 75K
00:00 - 05:00 5.00
PERFOB P 15,75000
OTHCMP
- MONITOR WELL WITH TRIP TANK- GOOD
DISPLACEMENT
TRIP IN HOLE WITH 2-7/8" PERFORATING
7/13/2017
ASSEMBLY ON 4" DP STANDS FROM 5216' MD
AT MIDNIGHT TO TAG PBTD ON DEPTH AT
15655' MD. PULL UP 134' TO SPACEOUT WITH
BOTTOM OF GUN ASSEMBLYAT 15521' MD.
j
- RUNNING SPEED = 200 FPM
- PICKUP/SLACKOFF WEIGHTS ON DEPTH =
220/122 KLBS
05:00 06:00 1.00
PERFOB P 15,750.00
OTHCMP
PERFORATE WELL WITH 2-718" JRC VANN
GUNS PER HALLIBURTON REP
- FOLLOW PRESSURE UP/BLEED OFF
SEQUENCE FOR 31 MINUTES TO FIRE WITH
MAXFIRE HEAD.
- 2210' NET PERFS IN SAG RIVER SAND
FORMATION (FINAL PEF MEMO DATED
7/10/17), REFERENCE LOG = BAKER DRILLING
LWO LOGS
- FOUR INTERVALS, 6 SPF, 600 PHASING,
17.5G CHARGES, 38.6" PENETRATION, 0.37"
ENTRY HOLE DIAMETER:
- 11920' MD -12920' MD (1000' IN FAULT
BLOCK I)
- 13300'- 13650' MD (350' IN FAULT BLOCK
2)
- 14185' - 14675' MD (490' IN FAULT BLOCK
3)
- 15150'- 15520' MO (370' IN FAULT BLOCK
4)
-
OBSERVE POSITIVE SIGNS OF SHOTS
FIRING; 100 PSI LOSS AND INITIAL LOSS OF 7
BBLS
Printed 8/8/2017 11:20:11AM *AA depths reported in Drillers Depths`
North Amenca - ALASKA - BP Page 6 of 12
Operation Summary Report
Common Well Name: J-28 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 7/92017 End Date: 7/15/2017 X3 -0184N -C: (2,859,304.00 )
Rig Name/No.: PARKER 272 1, Spud DateTme: 5/17/1987 12:00 OOAM Rig Release: 7/152017 1
Active datum: J-28AActual @85.87usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase Description of Operations
(hr) _ _ Wait)
06:00 - 08:30 2.50 PERFOB P 15,750.00 OTHCMP i PULL UP HOLE HATH 2-7/8" PERFORATING
(ASSEMBLY TO SAFETY FROM 15521' MD TO
ABOVE TOP OF 4-12" LINER AT 10495 MD
INITIAL PICKUP WEIGHT= 235 KLBS; 25
KLBS HIGHER THAN PU WEITH PRIOR TO
FIRING GUNS
0 2.50 PERFOB
11:00 - 13:30 I 2.50 I PERFOB
13:30 - 16:00 ' 2.50 PERFOB
Printed ere/2017 11:20:11AM •All depths reported in Drillers Depths'
- PULLING SPEED = 110 FPM (PER PROGRAM)
- MONITOR HOLE FILL WITH TRIP TANK, WELL
- NO SIGNS OF WELL SANDING OR GUN
SWELLING ISSUES
1600 - 1700 1.00 PERFOS P
- FLOWCHECK WELL FOR 10 MIN AT TOP OF
_U
LINER; WELL TAKING FLUID
P 15,750.00
OTHCMP PULL OUT OF THE HOLE WITH 2-7/8"
PERFORATING ASSEMBLY FROM 10495' MD
DOWN PERFORATING GUNS ANDAAR WITH
TO 5212' MD
- STANDING BACK 4" DRILL PIPE STANDS IN
THE DERRICK
CREW. DRILLER QUICKLY RECOGNIZED
SIMOPS:
- LAY DOWN. STANDS OF 4" DRILL PIPE
UTILIZING OFF-LINE STAND BUILDING
INITIATED THE WELL CONTROL RESPONSE.
EQUIPMENT
P 15,750.00
OTHCMP PULL OUT OF THE HOLE WITH 2-7/8"
PERFORATING ASSEMBLY, LAYING DOWN
NON-SHEARBLES (PERF GUNS) WAS
2-7/8" PAC DRILL PIPE SINGLES TO THE PIPE
SHED
- FROM 5212' MD TO TOP OF PERFORATING
WAS ALSO HELD ON WAYS TO IMPROVE
GUNSAT 3640' MD
SAFETY JOINT HANDLING AND MAKE UP FOR
- MONITOR HOLE FILL WITH TRIP TANK, WELL
SMALL PIPE (2-7/8" PAC SAFETY JT). _
TAKING -1 BPH
P 15,750.00
OTHCMP PULL OUT OF THE HOLEAND LAY DOWN
2-7/8" PERFORATING GUNS FROM 3460' MD
LAY DOWN 2-7/8" PERFORATING GUNS FROM
TO 2590' MD
- PU 68K, SO 66KAT 3640' MD
Printed ere/2017 11:20:11AM •All depths reported in Drillers Depths'
- MONITOR HOLE FILL WITH TRIP TANK, WELL
TAKING -1 BPH
1600 - 1700 1.00 PERFOS P
15,750.00
OTHCMP UNANNOUNCED D2 (KICK WHILE TRIPPING)
DRILL WITH ADDED COMPLEXITY OF LAYING
DOWN PERFORATING GUNS ANDAAR WITH
RIG CREW AND HALLIBURTON PERFORATING
CREW. DRILLER QUICKLY RECOGNIZED
INCREASE IN FLUID IN TRIP TANKAND
INITIATED THE WELL CONTROL RESPONSE.
DURING AAR, STANDING ORDERS FOR
NON-SHEARBLES (PERF GUNS) WAS
REVIEWED AND DISCUSSED. DISCUSSION
WAS ALSO HELD ON WAYS TO IMPROVE
SAFETY JOINT HANDLING AND MAKE UP FOR
_
SMALL PIPE (2-7/8" PAC SAFETY JT). _
17:00 - 23:30 6.50 PERFOB P
15,75000
OTHCMP CONTINUE TO PULL OUT OF THE HOLE AND
LAY DOWN 2-7/8" PERFORATING GUNS FROM
2590' MD TO SURFACE
- MONITOR HOLE FILL WITH TRIP TANK WELL
TAKING -1 BPH
- ALL GUNS FIRED
23:30 - 00:00 0.50 PERFOB P
15,750.00
OTHCMP CLEAN AND CLEAR RIG FLOOR
Printed ere/2017 11:20:11AM •All depths reported in Drillers Depths'
Comnan Well Name: J-28
Event Type: COM- ONSHORE (CON)
Rig Name/No.:
Rig Contractor,
North America - ALASKA- BP
Operation Summary Report
Start Date: 7/9/2017 End Date: 7/15/2017
Site: PB J Pad
Spud DateRme: 5/17/1987 12:0M00AM
e datum: J-28AActual @85.87usft (above Mean Sea Leveq
Page 9 of 12
AFE No
X3-0184WC: (2,859,304,00)
Rig Release: 7/15/2017
BPUOI: USA00000397
Date From - To Him Task Code NPT I Total Depth
Phase Description of Operations
(hr) ___ (us")
___
14/2017 00:00 - 01:30 1.50 RUNCOM P 15,750.00
RUNCMP RIG UP TO RUN 4-1/2" COMPLETION
ASSEMBLY
- RIG UP TORQUE TURN EQUIPMENT
-DRAIN STACK AND PULL WEAR BUSHING
-VERIFY COMPLETION LAY -OUT IN PIPE
SHED WITH HALLIBURTON REPRESENTATIVE
AND WSL.
01:30 - 14:30 13.00 RUNCOM P 15,750.00
RUNCMP RUN 4-1/2"COMPLETIONASSEMBLYTO
10516' MD (TAG BASE OF PBR 11' DEEPER
THAN EXPECTED).
- BAKER-LOK ALL CONNECTIONS BELOW THE
PRODUCTION PACKER
- USE JET LUBE SEAL GUARD PIPE DOPE ON
ALL VAMTOP CONNECTIONS B TORQUE ALL
CONNECTIONS TO OPTIMUM MAKE UP
TORQUE; 4440 FT -LBS
- VAM REP ON LOCATION TO INSPECT ALL
THREADS AND WITNESS MAKE UP
- RUN IN THE HOLE AT 90 FPM
- NO ISSUES RUNNING IN HOLE THROUGH T'
LINER TOP AT 2787' MD
- MUD LOSSES WHILE RUNNING IN THE HOLE
= 6 BBLS
- ONE JOINT REJECTED, THREAD
PROTECTOR CAME OFF DURING HANDLING
AND DAMAGED SEAL FACE.
SIMOPS:
-LAY DOWN 4"DRILL PIPE OFFLINE WHILE
RUNNING COMPLETION
14:30 - 17:00 2.50 RUNCOM P 15,750.00
RUNCMP LAND 4-1/2"COMPLETION
iSPACE-OUTAND
WITH WLEG AT 10501' MD.
- TAG BASE OF PBR AND SPACE -OUT WITH
20' PUP TO PLACE WLEG IN MIDDLE OF PER
- MAKE UP AND LAND TUBING HANGER PER
CAMERON WELLHEAD REPRESENTATIVE
- PU 157 KLBS, SO 113 KLBS (P272 BLOCKS +
TD = 35 KLBS).
- RUN IN LOCK DOWN SCREWS
- SEEATTACHED TUBING TALLY.
1700 - 19:00 2.00 RUNCOM P 15,750.00
_
RUNCMP REVERSE CIRCULATE IN COMPLETION
FLUIDS
- PUMP 126 BELS OF CORROSION INHIBITED
SEAWATER AT BPM
- PUMP WITH 169 BBLS CLEAN SEAWATERAT
4 BPM
- CLEAN SEAWATER SPACED OUT TO BE
ABOVE UPPER GLM IN BOTH TUBING AND IA,
INHIBITED
SEAWATER BELOW GLM IN IA.
- PUMP 5 BBLS DOWN TUBING TO FLUSH
Printed 8/8/2017 11:20:11AM 'All depths reported in Drillers Depths'
North America - ALASKA - BP Page 10 of 12
Operation Summary Report
Common Well Name: J-28 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 7/9/2017 End Date: 7/152017 X3 -0184N -C: (2,859,304.00)
Rig Name/No.: PARKER 272
21:30
1 Spud DateRme: 5/17/1987 12:00:0OAM
Rig Release: 7/15/2017
Rig Contractor. PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-28AActua1 @85.87usft (above Mean Sea Level)
7/15/2017
00:00
Date
From - To
Him
Task Code
NPT Total Depth
Phase Description of Operations
_
(hr)
(usft)
1900 - 21:30
2.50
RUNCOM P
15,750.00
RUNCMP SET PACKER AN -TEST COMPLETION AS
FOLLOWS:
-
-MAKEUP LANDING JOINT AND DROP THE
ROLLER -STEM BALLAND RODASSEMBLY
- PRESSURE UP ON THE TUBING TO 250 PSI
LOW NOT HOLDING PRESSURE; ATTEMPT
SEVERAL TIMES AT DIFFERENT PRESSURES
AND RATES WITH SAME RESULT.
- TROUBLESHOOT BLEED OFF ON TUBING
PRESSURE AND VERIFY LINEUP.
- REVERSE 3 BBLS TO FLUSHANY DEBRIS
OFF OF RHC -M PROFILE
- PRESSURE UP ON TUBING AND SHUT IN
PUMP; PRESSURE TREND BETTER BUT NOT
PASSING
- DETERMINE FLUID LEAKING BY PUMP.
- PRESSURE UP ON TUBING T0250 PSI LOW
FOR 5 CHARTED MIN (SHUT IN KILL HCR TO
ISOLATE PUMP), GOOD TEST
- PRESSURE UP AND SET THE 7" x 4-12" HES
'TNT PACKER AT 2100 PSI
- CONTINUE TO PRESSURE UPAND TEST
THE TUBING 3500 PSI FOR 30 CHARTED MIN
- LOST 45 PSI IN FIRST 15 MIN AND 15 PSI IN
THE SECOND 15 MIN, TEST MET BP
PRESSURE TESTING CRITERIA FOR WBE
- BLED PRESSURE ON THE TUBING T02000
PSI
- PRESSURE TEST THE PACKER AND IA
250/3500 PSI FOR 5/30 CHARTED MIN
- LOST 45 PSI IN THE FIRST 15 MIN AND 10
PSI IN THE SECOND 15 MIN, TEST MET BP
PRESSURE TESTING CRITERIA FOR WBE
- 10 BBLS PUMPED AND 10 BBLS BLED BACK
DISCUSS PRESSURE TEST RESULTS WITH
WOS(WSUP DELEGATE FOR WEEKEND)AND
RECEIVE ATP.
BLEED OFF PRESSURE ON TUBING AND
SHEAR DCK VALVE. PUMP BOTH WAYS AND
VERIFY CIRCULATION BOTH WAYS.
.2 BPM, 850 PSI DOWN THE TUBING
- 2 BPM, 550 PSI DOWN THE IA
SEE ATTACHED TEST CHART AND TEST
CRITERIA CALCULATOR _
15,750.00 RUNCMP FREEZE PROTECT WELL TO-2200'MD WITH
151 BBLS OF DIESEL
- REVERSE CIRCULATE 151 BBLS OF DIESEL
AT 2 BPM, 700 PSI
- ALLOW THE WELL TO U -TUBE FOR 1 HOUR
SIMOPS: LAY DOWN 4" DRILL PIPE UTILIZING
OFF-LINE STAND BUILDING EQUIPMENT_
15,750.00 RUNCMP FINISH ALLOWING THE WELL TO U -TUBE
DIESEL FREEZE PROTECT
- ALLOW THE WELL TO U -TUBE FOR i HOUR
- MONITOR WELL FOR 10 MINUTES AFTER U -
TUBE: STATIC
Pnnted 8/82017 11 20 11A `All depths reported in Drillers Depths'
21:30
- 00:00
2.50
1 RUNCOM P
RUNCOM P
7/15/2017
00:00
- 00:30
0.50
SEVERAL TIMES AT DIFFERENT PRESSURES
AND RATES WITH SAME RESULT.
- TROUBLESHOOT BLEED OFF ON TUBING
PRESSURE AND VERIFY LINEUP.
- REVERSE 3 BBLS TO FLUSHANY DEBRIS
OFF OF RHC -M PROFILE
- PRESSURE UP ON TUBING AND SHUT IN
PUMP; PRESSURE TREND BETTER BUT NOT
PASSING
- DETERMINE FLUID LEAKING BY PUMP.
- PRESSURE UP ON TUBING T0250 PSI LOW
FOR 5 CHARTED MIN (SHUT IN KILL HCR TO
ISOLATE PUMP), GOOD TEST
- PRESSURE UP AND SET THE 7" x 4-12" HES
'TNT PACKER AT 2100 PSI
- CONTINUE TO PRESSURE UPAND TEST
THE TUBING 3500 PSI FOR 30 CHARTED MIN
- LOST 45 PSI IN FIRST 15 MIN AND 15 PSI IN
THE SECOND 15 MIN, TEST MET BP
PRESSURE TESTING CRITERIA FOR WBE
- BLED PRESSURE ON THE TUBING T02000
PSI
- PRESSURE TEST THE PACKER AND IA
250/3500 PSI FOR 5/30 CHARTED MIN
- LOST 45 PSI IN THE FIRST 15 MIN AND 10
PSI IN THE SECOND 15 MIN, TEST MET BP
PRESSURE TESTING CRITERIA FOR WBE
- 10 BBLS PUMPED AND 10 BBLS BLED BACK
DISCUSS PRESSURE TEST RESULTS WITH
WOS(WSUP DELEGATE FOR WEEKEND)AND
RECEIVE ATP.
BLEED OFF PRESSURE ON TUBING AND
SHEAR DCK VALVE. PUMP BOTH WAYS AND
VERIFY CIRCULATION BOTH WAYS.
.2 BPM, 850 PSI DOWN THE TUBING
- 2 BPM, 550 PSI DOWN THE IA
SEE ATTACHED TEST CHART AND TEST
CRITERIA CALCULATOR _
15,750.00 RUNCMP FREEZE PROTECT WELL TO-2200'MD WITH
151 BBLS OF DIESEL
- REVERSE CIRCULATE 151 BBLS OF DIESEL
AT 2 BPM, 700 PSI
- ALLOW THE WELL TO U -TUBE FOR 1 HOUR
SIMOPS: LAY DOWN 4" DRILL PIPE UTILIZING
OFF-LINE STAND BUILDING EQUIPMENT_
15,750.00 RUNCMP FINISH ALLOWING THE WELL TO U -TUBE
DIESEL FREEZE PROTECT
- ALLOW THE WELL TO U -TUBE FOR i HOUR
- MONITOR WELL FOR 10 MINUTES AFTER U -
TUBE: STATIC
Pnnted 8/82017 11 20 11A `All depths reported in Drillers Depths'
North America - ALASKA - BP Page 11 of 12
Operation Summary Report
Common Well Name: J-28 AFE No
Event Type: COM- ONSHORE (CON) I Start Date: 7/9/2017 End Date: 7/15/2017 X3 -0184N -C: (2,859,304.00)
Rig Name/No.: PARKER 272 1 Spud DateTme: 5/17/1987 12:00:OOAM Rig Release: 7/15/2017 !
Active datum: J-28AActual @85.87usft (above Mean Sea Levu
Date From -To His Task Code NPT Total Depth Phase Description of Operators
_ (hr) (usft)
00:30 - 03:00 2.50 WHSUR P 15,750.00 RUNCMP INSTALL AND TEST 6"TWC PER VALVECREW
REPRESENTATIVE
- MAKE UP DUTCH RISER AND LUBRICATOR
-INSTALL TWC
- RIG DOWN LUBRICATOR AND DUTCH RISER
- TEST FROM BELOW WITH DIESEL; 250 PSI
LOW 3500 PSI HIGH FOR 5 CHARTED MIN
EACH; GOOD TEST
- TEST FROM ABOVE WITH DIESEL, 250 PSI
LOW 3500 PSI HIGH FOR 5 CHARTED MIN
! EACH; GOOD TEST
SWOPS: LAY DOWN 4" DRILL PIPE UTILIZING
_ OFF-LINE STAND BUILDING EQUIPMENT.
03:00 - 06:30 3.50 BOPSUR P 15,750.00 RUNCMP NIPPLE DOWN BOPEAND HIGH PRESSURE
06:30 - 09:00 i 2.50
09:00 - 12:00 I 3.00
- 13:00 1.00
Printed 8/82017 11:20:11AM *All depths reported in Drillers Depths'
RISER
- PUMP OUT STACK AND CLEAN DRIP PANS
-DE-ENERGIZE ACCUMULATOR
- LET AIR OUT OF AIR BOOTS AND PULL BELL
NIPPLE
- RE -DRESS UPPER RAM CAVITIES WITH
4-1/2" X 7" VBR'S FOR NEXT WELL
- BREAK STACKAND RACK BACK ON STUMP
- NIPPLE DOWN HIGH PRESSURE RISERS
AND LAY DOWN TO PIPE SHED
- SIMOPS: LAY DOWN 4" DRILL PIPE
UTILIZING OFF-LINE STAND BUILDING
EQUIPMENT.
_
WHSUR
P
15,750.00
RUNCMP NIPPLE UP TUBING HEAD ADAPTER
- SIMOPS: LAY DOWN 4" DRILL PIPE
UTILIZING OFF-LINE STAND BUILDING
EQUIPMENT.
WHSUR
N
15,750.00
RUNCMP UNSUCCESSFULLY ATTEMPT TO PRESSURE
TEST TUBING HANGER VOID.
- UNABLE TO GET PRESSURE TO HOLD.
TROUBLESHOOTAND CONFIRM NO ISSUES
WITH HANGER VOID.
- CHANGE OUTAIR/HYDRAULIC PUMP TWICE,
CHANGE OUT TESTING MANIFOLD/FITTINGS.
RE -FLUSH UNESNOID WITH NEW
HYDRAULIC OIL.
- SIMOPS: LAY DOWN 4" DRILL PIPE
UTILIZING OFF-LINE STAND BUILDING
EQUIPMENT.
WHSUR PT~- 15,750.00
RUNCMP PRESSURE TEST TUBING HANGER VOID TO
250 PSI LOW FOR 5 MIN AND 4500 PSI HIGH
FOR 15 MIN TO OLD BP PRACTICE 100218
CRITERIA (NEW CRITERIA NOT MOC'D IN
ALASKA VET).
- PASSING TESTS, APPROVED VERBALLY BY
WEEKEND ON DUTY WSUP.
- SEE ATTACHED CHART
-TEST WITH HYDRAULIC OIL, AMBIENT AIR
TEMP = 45°F
- HIGH PRESSURE TEST TAKES 40 MIN TO
STABILIZE BEFORE PRESSURE DECLINE
DROPS BELOW 5 PSI/MIN
- SIMOPS: GENERAL RIG DOWN
Printed 8/82017 11:20:11AM *All depths reported in Drillers Depths'
Printed 8/8/2017 11 20: 11AM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 12 of 12
Operation Summary Report
Common Well Name: J-28
- - --
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 7/9/2017 End Date: 7/15/2017
X3 -0184N -C: (2,859,304.00)
Project: Prudhoe Bay
Site: PB J Pad
Rig Name/No.: PARKER 272
Spud DateRme: 5/17/1987 12:00:OOAM
Rig Release: 7/15/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000397
Active datum: J-28AActual (9?85.87usft (above Mean Sea Level)
Date From -To Him
Task
Code
NPT Total Dept
Phase
Description of Operations
(hr)_
(usft)
13:00 - 14:00 1.00
WHSUR P 15,750.00 j RUNCMP
NIPPLE UP 7-1/16" DOUBLE MASTER VALVE
DRYHOLETREE.
- VALVES ALIGNED TO RIGHT
- PERFORM LEAKTIGHT PRESSURE TEST
WITH DIESEL TO 250 PSI LOW AND 4500 PSI
HIGH (PASSING TESTS, NO CHART
REQUIRED)
- SIMOPS: GENERAL RIG DOWN
_.
OPERATIONS THROUGHOUT RIG
14.00 - 1600 2.00
RIGID P 15,750.00 RUNCMP
CLEAN WELL CELLAR AND SECURE WELL.
END CON EVENT AND RELEASE PARKER RIG
272 AT 16:00 ON 7/15/17.
-SIMOPS: GENERAL RIG DOWN
OPERATIONS THROUGHOUT RIG - SECURE
TOP DRIVE AND BRIDLE UP, RIG DOWN RIG
FLOOR
j
- FINAL TA/O = 0/0/O PSI
- INSTALL WELLHEAD AND TREE JEWELRY
WITH CAMERON. ALLTREENVELLHEAD
VALVES LEFT CLOSED
- CLEAN UP PAD LOCATION AND CONFIRM
ACCEPTABLE CONDITION WITH PAD
OPERATOR.
- COMPLETE WELL HANDOVER WITH WELLS
GROUP (FORM AND SCHEMATIC ATTACHED)
PERFORMANCE SUMMARY:
- TIME: 28.92 DAYS, 1.28 DAYS UNDER 30.2
DAY AFE, 1.52 DAYS OVER 27.4 DAY TARGET
-COST: $10.5MM,$500K UNDER$11.022MM
AFE, $300K OVER $10.2MM TARGET
-159.5 HOURS, 6.65 DAYS, 23%
NON-PRODUCTIVE TIME (WAITING ON PAD
PREP, PRODUCTION HOLE SIDETRACK,
CLEANOUT RUN PRE -PERF GUNS)
- DAYS PER 10K FROM SPUD (BEGIN OF
WINDOW) TO LAYDOWN FINAL DRILLING BHA
-15.1
NEXT WELL= C -34B RIG SIDETRACK
Printed 8/8/2017 11 20: 11AM *All depths reported in Drillers Depths'
2�44r,:
P
North America - ALASKA - BP
Prudhoe Bay
PB J Pad
J-28
J-28APB1
500292172171
Design: J-28APB1
Final Survey Report
10 July, 2017
BA ER
F IGHES
BAT
GE company
���•s 1r''p
BP
^'
Final Survey Report
BAFYE So
Company: North America -ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project: Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Sao: PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Wall: J-28
North Reference:
True
Wellbore: J-28APB7
Survey Calculation Method:
Minimum Curvature
Design: J-28APB7
Database:
EDM RSK-Alaska PROD -ANCPI
Project Prudhoe Bay, GPB, PRUDHOE BAY
Map System: Alaska NAD27 State Plane Zones
System Datum:
Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK 14267'15864]
Using Well Reference Point
Map Zone: NAD27 °OGP-Usa AK / Alaska zone 4126734.1586•
Using geodetic scale factor
— �
--
- -- -
-
Site PB J Pad, TR -11-13
Site Position:
Northing:
5,988,224.220 usft Latitude:
70° 19' 14.845 N
From: Map
Position Uncertainty: 0.00
Easting:
641,155.790 usft Longitude:
148" 51'20.( W
usft
Slot Radius:
0.000 in Grid Convergence:
1.08 °
Well J-28, J-28
Well Position -NI-S 0.00 usft
Northing:
5,970,537.000 usft
Latitude:
70° 19'37.316 N
I .El -W 0.00 usft
Easting:
642,621.000 usft
Longitude:
148° 50'36.055 W
LPosition Uncertainty 0.00 usft
Wellhead Elevation: 39.52 usft
Ground Level:
39.07 usft
Wellbore J-28APB1s
Magnetics Name Sample Date
Mo
Declination
Dip Angle Field Strength
1°I
1°I Inn
13GGM2016 7/1/2017
17.78
81.01 57,551
Design J-28APB1
- --
Audit Notes:
Version: Phase: ACTUAL
To On Depth: 2,908.76
Vertical Section: Depth From (TVD)
•W -S
•El -W Direction
(usft)
(usft)
(usft) (I
46.35
0.00
0.00 275.27
7710/2017 4:36116PM Page 2 COMPASS 5"..1 Build 81D
•. h
BP
From
Zti�� �./p
Final Survey Report
BAF�UGHES
108.76
2,908.76 J-28 Srvy 1 BOSS -MS (J-28PB1)
6HES
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project: Prudhoe Bay
TVD Reference:
J-28AActual Q 85.87usft (Parker 272 Actual)
Site: PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well J-28
North Reference:
True
Wellbore: J-28APB1
Survey Calculation Method:
Minimum Curvature
Design: J-28APB7
Database:
EDM RSK - Alaska PROD -ANCP7
Survey Program
Date 7/10/2017
From
To
(usft)
(Usft) Survey [Wellbore)
108.76
2,908.76 J-28 Srvy 1 BOSS -MS (J-28PB1)
2,953.00
3,706.00 Gyrodata SS 8-1/2" (J-28APB7)
3,801.81
10,630.03 BHI ATK MWD 8-1/2' X 9-7/8" (J-28APB7)
10,683.54
11,440.25 BHI OTK MWD SAW (J-28AP81)
11,523.02
13,569.08 BHI ATK MWD 6-1/8"(J-28APB1)
608.76
0.12
Survey
608.76
MD
Inc Azi(azimuth) TVD
Weill)
1°I 0 (usft)
46.35
0.00 0.00 46.35
108.76
0.18 129.40 108.76
208.76
0.13
87.19
208.76
308.76
0.18
125.70
308.76
408.76
0.10
62.80
408.76
508.76
0.13
94.61
508.76
608.76
0.12
156.50
608.76
708.76
0.08
86.60
708.76
808.76
0.10
72.80
808.76
808.76
0.10
119.31
908.76
1,008.76
0.00
0.00
1,008.76
1,108.76
0.25
352.61
1,108.76
1,208.76
0.05
356.50
1,208.76
1,308.76
0.10
12.69
1,308.76
1,408.76
0.02
177.11
1,408.76
1,508.76
0.15
287.70
1,508.76
1,608.76
0.18
258.30
1,608.76
1,708.76
0.10
292.00
1,708.78
1,808.76
0.22
-
262.30
1,808.76
Tool Name Description
BOSS -GYRO Sperry -Sun BOSS gyro multishot
GYD-GC-SS Gyrodata gyro single shots
MWD+IFR+MS-WOCA
MIND + IFR +Multi Station W/O Crustal
MWD+IFR+MS-WOCA
MWD + IFR + Mufti Station W/O Crustal
MWD+IFR+MS-WOCA
MWD +IFR+Multi Station W/O Crustal
TVDSS
ILS
EAN
Northing
EssBng
D1.9g
(Usft)
(usft)
(usft)
(usft)
(usft)
(°/100us1q
-39.52
0.00
0.00
5,970,537.000
642,621.000
0.00
22.89
-0.06
0.08
5,970,536.939
642,621.077
0.29
122.89
-0.16
0.31
5,970,536.850
642,621.313
0.12
222.89
-0.24
0.55
5,970,536.768
642,621.556
0.11
322.89
-0.29
0.76
5,970,536.720
642,621.762
0.16
422.89
-0.26
0.95
5,970,536.755
642,621.952
0.07
522.89
-0.37
1.10
5,970,536.652
642,622.109
0.13
622.89
-0.46
1.21
5,970,536.563
642,622.222
0.12
722.69
-0.43
1.37
5,970,536.596
642,622.374
0.03
822.89
-0.45
1.53
5,970,536.582
642,622.534
0.08
922.89
-0.49
1.60
5,970,536.540
642,622.611
0.10
1,022.89
-0.27
1.57
5,970,536.756
642,622.579
0.25
1,122.89
-0.01
1.54
5,970,537.015
642,622.543
0.20
1,222.89
0.11
1.56
5,970,537.144
642,622.558
0.05
1,322.89
0.18
1.58
5,970,537.212
642,622.577
0.12
1,422.89
0.20
1.46
5,970,537.232
642,622.452
0.16
1,522.89
0.21
1.18
5,970,537.235
642,622.174
0.09
1,622.89
0.21
0.94
5,970,537.231
642,621.939
0.11
1,722.89
0.22
0.67
5,970,537.233
642,621.668
0.14
V. Sec
(usft)
0.00
-0.08
-0.33
-0.57
-0.78
-0.97
-1.14
-1.26
-1.41
-1.57
-1.65
-1.59
-1.54
-1.54
-1.55
-1.43
-1.15
-0.91
-0.64
7/10/2817 4r36:16PM Page 3 COMPASS 5000.1 Build 81D
�.lrN�S
00#0 by
Company: North America - ALASKA - BP
Project: Prudhoe Bay
Site: PB J Pad
Well: J-28
Wellbore: J-29APS1
Design: J-28APB1
Survey
MD
Wall)
1,908.76
2,008.76
2,108.76
2,208.76
2,308.76
2,408.76
2,508.76
2,608.76
2,676.76
13 3/8"
2,708.76
2,758.76
2,808.76
2,858.76
2,908.76
TIP
2,953.00
KOP-TOWS
2,954.21
9518..
2,967.00
2,999.00
3,035.00
3,065.00
3,095.00
3,126.00
3,216.00
BP BATER i
Final Survey Report UGHES
ae�ooeay
Local Coordinate Reference:
Well J-28
TVD Reference:
J-28AAclual @ 85.87usft (Parker 272 Actual)
MD Reference:
J-28AAclual Q 85.87usft (Parker 272 Actual)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K- Alaska PROD - ANCP1
Inc
Azl(azimuth)
TVD
NDSS
NIS
E/W
Northing
Eating
DLeg
V. Sec
1°1
(°)
(usft)
Waft)
(usft)
(usft)
(usft)
(usR 1
('l100usft)
(usft)
0.22
318.11
1,908.76
1,822.89
0.34
0.35
5,970,537.344
642,621.347
0.21
-0.31
0.28
341.40
2,008.75
1,922.88
0.71
0.15
5,970,537.715
642,621.134
0.12
-0.07
0.33
346.00
2,108.75
2,022.88
1.22
0.00
5,970,538.223
642,620.977
0.06
0.13
0.12
355.40
2,208.75
2,122.88
1.61
-0.08
5,970,538.605
642,620.891
0.21
0.25
0.07
315.50
2,308.75
2,222.88
1.75
-0.13
5,970,536.752
642,620.837
0.08
0.32
0.10
25.30
2,408.75
2,322.88
1.88
-0.13
5,970,538.874
642,620.830
0.10
0.34
0.10
154.40
2,508.75
2,422.88
1.88
-0.06
5,970,538.876
642,620.905
0.18
0.26
0.18
102.40
2,608.75
2,522.86
1.77
0.13
5,970,538.767
642,621.098
0.14
0.06
0.09
32.99
2,676.75
2,590.88
1.79
0.26
5,970,538.792
642,621.231
0.25
-0.07
0.13
355.40
2,708.75
2,622.88
1.84
0.28
5,970,538.849
642,621.241
0.25
-0.07
2.88
308.11
2,758.73
2,672.86
2.68
-0.72
5,970,539.662
642,620.232
5.59
1.01
4.02
303.40
2,808.64
2,722.77
4.42
-3.17
5,970,541.355
642,617.748
2.35
3.63
4.57
300.40
2,858.50
2,772.63
6.39
-6.35
5,970,543.267
642,614.530
1.19
7,01
5.07
298.70
2,908.32
2,822.45
8.46
-10.01
5,970,545.266
642,610.836
1.04
10.87
5.83
300.05
2,952.36
2,866.49
10.52
-13.67
5,970,547.260
642,807.138
1.74
14.73
5.82
301.58
2,953.56
2,667.69
10.59
-13.77
5,970,547.321
642,607.031
12.89
14.84
5.92
317.73
2,966.29
2,880.42
11.41
-14.77
5,970,548.129
642,606.020
1209,
15.93
7.15
322.01
2,998.08
2,912.21
14.20
-17.10
5,970,550.875
642,603.632
4.13
18.55
9.32
326.01
3,033.71
2,947.84
18.39
-20.11
5,970,555.000
642,600.544
6.23
22.00
11.12
329.72
3,063.23
2,977.36
22.90
-22.93
5,970,559.456
642,597.642
6.39
25.29
12.42
333.01
3,092.60
3,006.73
28.27
-25.85
5,970,564.774
642,594.617
4.88
28.79
13.16
335.35
3,122.83
3,036.96
34.45
-28.84
5,970,570.894
642,591.516
2.91
32.43
15.80
346.72
3,209.98
3,124.11
55.70
-35.93
5,970,591.998
642,584.024
4.30
41.79
7/10/2017 4:36:16PM Page 4 COMPASS 5000.1 Build 81D
=p
0411`
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB J Pad
Well:
J-28
Wellbore:
J-28APB1
Design:
J-28APB1
Survey
MD
(usft)
3,246.00
3,276.00
3,306.00
3,336.00
3,406.00
3,506.00
3,606.00
3,706.00
3,801.81
3,865.93
3,960.44
4,055.57
4,149.28
4,243.75
4,339.62
4,434.38
4,529.38
4,624.25
4,719.07
4,813.53
4,907.71
5,001.45
5,096.94
5,191.76
'. 5,286.22
5,380.85
5,475.24
BP
Azi (azimuth)
Final Survey Report
BA ER
UGHES
NIS
aae�o,,,�,�v
Local Co-ordinate Reference:
Well J-28
TVD Reference:
J-28AActual @ 85.67usft (Parker 272 Actual)
MD Reference:
J-28AActual 0 85.87usft (Parker 272 Actual)
North Reference:
Tme
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Inc
Azi (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
1°1
I`1
(usft)
(usft)
(usft)
(usft)usft
1 1
1us64
('11100usft)
(usrt)
16.86
350.15
3,238.77
3,152.90
63.96
-37.61
5,970,600.226
642,582.184
4.78
44.37
17.50
351.46
3,267.43
3,181.56
72.70
-39.02
5,970,608.944
642,580.604
2.49
46.73
18.86
353.72
3,295.93
3,210.06
81.99
40.22
5,970,618.200
642,579.228
5.11
48.94
19.73
353.70
3,324.25
3,238.38
91.84
41.31
5,970,628.030
642,577.955
2.90
51.09
22.08
357.62
3,389.64
3,303.77
116.73
43.15
5,970,652.862
642,575.639
3.91
55.64
24.59
4.14
3,481.47
3,395.60
156.28
-42.43
5,970,692.429
642,575.609
3.60
59.25
27.53
9.21
3,571.30
3,485.43
199.66
-37.23
5,970,736.097
642,579.982
3.69
58.83
30.46
12.95
3,658.77
3,572.90
247.38
-27.85
5,970,783.792
642,588.458
3.44
54.70
32.23
12.39
3,740.59
3,654.72
296.01
-16.92
5,970,832.612
642,598.456
1.87
49.15
34.83
13.63
3,794.04
3,708.17
330.51
-8.94
5,970,867.256
642,605.784
4.19
44.98
39.21
15.07
3,869.48
3,783.61
385.61
5.20
5,970,922.613
642,618.867
4.72
36.95
43.83
15.81
3,940.69
3,854.82
446.38
22.00
5,970,983.679
842,634.509
4.88
26.88
47.24
16.40
4,006.32
3,920.45
510.62
40.58
5,971,048.256
642,651.842
3.67
15.45
50.29
17.18
4,068.58
3,982.71
578.62
61.09
5,971,116.831
642,671.074
3.29
2.47
53.49
18.13
4,127.74
4,041.87
650.48
83.97
5,971,188.913
642,692.590
3.43
-12.43
56.88
19.03
4,181.84
4,095.97
724.21
108.77
5,971,263.092
642,715.978
3.66
-29.03
58.04
19.13
4,232.94
4,147.07
799.90
134.95
5,971,339.255
642,740.712
1.22
46.78
57.99
19.00
4,283.19
4,197.32
875.95
161.23
5,971,415.789
642,785.544
0.13
-64.60
57.95
18.80
4,333.48
4,247.61
952.00
187.27
5,971,492.316
642,790.130
0.18
-82.18
58.06
19.23
4,383.53
4,297.66
1,027.74
213.37
5,971,568.532
642,814.785
0.40
-99.85
57.94
20.09
4,433.43
4,347.56
1,102.95
240.24
5,971,644.236
642,840.219
0.78
-118.35
57.97
20.23
4,483.17
4,397.30
1,177.54
267.63
5,971,719.326
642,866.179
0.13
-137.42
58.02
19.91
4,533.78
4,447.91
1,253.60
295.42
5,971,795.893
642,892.514
0.29
-156.74
58.08
19.87
4,583.96
4,498.09
1,329.26
322.79
5,971,872.050
642,918.441
0.07
-175.69
58.07
19.70
4,633.91
4,548.04
1,404.70
349.93
5,971,947.986
642,944.138
0.15
-194.42
58.02
19.22
4,883.99
4,598.12
1,480.40
376.68
5,972,024.178
642,969.441
0.43
-212.74
58.06
19.21
4,733.96
4,648.09
1,556.02
403.03
5,972,100.280
642,994.353
0.04
-230.68
7/102017 4:36:16PM Page 5 COMPASS 5000.1 Build 81D
r••'rs BP
y►..�
bp Final Survey Report BAgUGHES
Eoumpany
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project
Prudhoe Bay
TVD Reference:
J-28AACWal @ 85.87usft (Parker 272 Actual)
Site:
PB J Pad
MD Reference:
J-28AActual a 85.87usft (Parker 272 Actual)
Well:
J-28
North Reference:
True
Wellbore:
J-28APB1
Survey Calculation Method:
Minimum Curvature
Design:
J-28APB1
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
4,784.22
4,698.35
1,631.89
MD
Inc
AN (aimu8r)
TVD
TVDSS
NIS
EIW
Northing
Easting
DI -99
V. Sec
(usft)
(I
(I
(usft)
(usft)
(usft 1
(usft)
(usft)
(usft)
(1100us1q
(usft)
5,570.10
57.95
19.68
4,784.22
4,698.35
1,631.89
429.60
5,972,176,635
643,019.672
0.42
-249.00
5,664.58
58.05
19.91
4,634.28
4,748.41
1,707.28
456.92
5,972,252.525
643,045.353
0.25
-267.73
5,758.29
57.93
19.66
4,883.96
4,798.09
1,782.05
483.82
5,972,327.788
643,070.823
0.26
-286.30
5,853.62
57.76
19.31
4,934.69
4,848.82
1,858.14
510.74
5,972,404.365
643,096.290
0.36
-304.75
5,947.16
57.75
19.33
4,984.60
4,898.73
1,932.79
536.91
5,972,479.502
643,121.039
0.02
-322.61
6,042.58
57.94
19.89
5,035.38
4,949.51
2,008.89
564.03
5,972,556.095
643,146.698
0.54
-341.25
6,137.28
57.88
19.81
5,085.71
4,999.84
2,084.35
591.27
5,972,632.049
643,172.497
0.11
-360.09
6,231.80
57.80
20.58
5,136.03
5,050.16
2,159.44
618.89
5,972,707.644
643,198.682
0.69
-379.34
6,326.45
57.84
21.05
5,186.44
5,100.57
2,234.32
647.35
5,972,783.047
643,225.719
0.42
-399.46
6,421.21
57.76
21.50
5,236.94
5,151.07
2,309.04
676.45
5,972,858.301
643,253.386
0.41
420.22
6,515.82
57.83
21.42
5,287.36
5,201.49
2,383.54
705.74
5,972,933.342
643,281.250
0.10
441.20
6,610.67
57.81
21.61
5,337.88
5,252.01
2,458.23
735.18
5,973,008.568
643,309.265
0.17
-462.31
6,705.55
57.84
21.23
5,388.40
5,302.53
2,532.99
764.51
5,973,083.868
643,337.165
0.34
-483.30
6,800.35
58.02
21.27
5,438.73
5,352.86
2,607.86
793.62
5,973,159.273
643,364.850
0.19
-504.06
6,895.33
58.02
20.85
5,489.04
5,403.17
2,683.04
822.57
5,973,234.888
643,392.365
0.38
-524.63
6,990.61
58.09
20.57
5,539.45
5,453.58
2,758.67
851.16
5,973,311.138
643,419.511
0.26
-544.79
7,084.76
58.02
20.00
5,589.27
5,503.40
2,833.61
878.86
5,973,386.581
643,445.778
0.52
-564.14
7,178.86
58.00
19.61
5,639.12
5,553.25
2,908.70
905.90
5,973,462.165
643,471.385
0.35
-582.81
7,273.57
58.06
19.90
5,689.27
5,603.40
2,984.31
933.06
5,973,538.277
643,497.097
0.27
-601.55
7,368.22
58.04
2016
5,739.35
5,653.48
3,059.74
960.63
5,973,614.212
643,523.229
0.32
-620.72
7,462.90
57.95
20.89
5,789.53
5,703.66
3,134.91
988.85
5,973,689.895
643,550.009
0.57
-640.56
7,558.10
54.24
20.38
5,842.63
5,756.76
3,208.84
1,016.70
5,973,764.333
643,576.444
3.92
-660.17
7,652.77
50.19
19.58
5,900.62
5,814.75
3,279.13
1,042.27
5,973,835.097
643,600.674
4.33
-677.91
7,747.58
46.65
19.36
5,963.53
5,877.66
3,345.98
1,065.91
5,973,902.382
643,623.036
3.74
-694.10
7,841.74
42.85
18.06
6,030.39
5,944.52
3,408.75
1,087.19
5,973,965.535
643,643.121
4.15
-708.41
7,936.32
39.34
17.43
6,101.66
6,015.79
3,467.95
1,106.15
5,974,025.077
643,660.947
3.74
-720.78
8,031.73
35.52
16.19
6,177.41
6,091.54
3,523.44
- �-
1,122.94
5,974,080.873
643,676.681
4.08
-731.41
7/10/2017 4:36:16PM
-
Page e
-
COMPASS 5000.1 Build 870
r...,, b
�..Nj P
Company:
Project:
Site:
Well:
Wellbore:
Design:
Survey
BP
Final Survey Report
BA ER
BAT
GEmmp ny
North America - ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Prudhoe Bay
TVDSS
NIS
EIW
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actua0
J-28
North Reference:
True
J-28APB1
Survey Calculation Method:
Minimum Curvature
J-28APBI
Database:
EDM R5K-Alaska PROD - ANCP1
MD
Inc
AN (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Emdng
DLeg
V. Sec
(usft)
(°)
)°)
(usft)
(usft)
(usft)
Wait)
(usft)
(usfo
(°1100usR)
(usft)
8,126.03
31.74
15.56
6,255.91
6,170.04
3,573.66
1,137.24
5,974,131.352
643,690.019
4.03
-740.14
8,221.25
28.17
15.35
6,338.40
6,252.53
3,619.47
1,149.91
5,974,177.398
643,701.818
3.75
-747.73
8,315.86
24.05
15.74
6,423.34
6,337.47
3,659.58
1,161.06
5,974,217.708
643,712.199
4.36
-754.43
8,411.18
19.78
15.68
6,511.76
6,425.89
3,693.81
1,170.68
5,974,252.106
643,721.174
4.50
-760.27
8,505.50
15.37
16.01
6,601.66
6,515.79
3,721.19
1,178.44
5,974,279.626
643,728.412
4.66
-76099
8,599.19
11.61
15.27
6,692.74
6,606.87
3,742.22
1,184.35
5,974,300.770
643,733.920
4.02
-768.57
8,693.63
8.58
10.08
6,785.71
6,699.84
3,758.33
1,188.09
5,974,316.944
643,737.349
3.35
-770.52
8,789.04
4.99
357.46
6,880.45
6,794.58
3,769.49
1,189.15
5,974,328.118
643,738.199
4.05
-770.36
8,882.69
3.52
308.60
6,973.86
6,887.99
3,775.35
1,186.72
5,974,333.935
643,735.660
4.02
-767.30
8,977.77
3.65
253.20
7,068.78
6,982.91
3,778.30
1,181.54
5,974,334.783
643,730.464
3.51
-762.05
9,073.37
4.61
241.15
7,164.14
7,078.27
3,773.56
1,175.27
5,974,331.931
643,724.239
1.35
-756.11
9,167.99
6.26
240.14
7,258.33
7,172.46
3,769.16
1,167.46
5,974,327.380
643,716.520
1.75
-748.83
9,262.81
8.43
240.00
7,352.36
7,266.49
3,763.11
1,156.96
5,974,321.132
643,706.134
2.29
-739.05
9,357.28
10.113
239.08
7,445.59
7,359.72
3,755.37
1,143.81
5,974,313.140
643,693.138
1.84
-726.83
9,451.97
12.21
239.36
7,538.48
7,452.61
3,745.97
1,128.03
5,974,303.447
643,677.539
2.17
-712,17
9,546.64
14.34
239.92
7,630.81
7,544.94
3,734.97
1,109.23
5,974,292.090
643,658.953
2.25
-694.68
III 9,641.31
16.67
238.45
7,721.83
7,635.96
3,722.01
1,087.56
5,974,278.726
643,637.532
2.50
-674.56
9,735.74
18.51
236.75
7,811.84
7,725.97
3,706.71
1,063.48
5,974,262.966
643,613.749
2.02
-652.29
9,830.25
20.22
236.69
7,901.00
7,815.13
3,689.51
1,037.28
5,974,245.276
643,587.885
1.81
-628.13
9,924.12
22.12
237.63
7,988.53
7,902.66
3,871.14
1,008.79
5,974,226.367
643,559.755
2.06
-601.82
10,019.80
24.08
238.82
8,076.54
7,990.67
3,651.39
976.88
5,974,206.013
643,528.221
2.11
-572.25
10,114.46
26.08
238.92
8,162.27
8,076.40
3,630.64
942.53
5,974,184.624
643,494.279
2.11
-540.37
10,209.75
28.04
239.07
8,247.12
8,161.25
3,608.32
905.37
5,974,161.596
643,457.558
2.06
-505.88
10,303.83
29.41
238.64
8,329.63
8,243.76
3,584.93
866.58
5,974,137.479
643,419.317
1.47
-469.97
10,398.92
31.39
239.59
8,411.64
6,325.77
3,560.24
825.38
5,974,112.012
643,378.499
2.14
-431.62
10,493.16
33.31
239.84
6,491.25
8,405.38
3,534.74
781.88
5,974,085.687
643,335.496
2.04
-391.16
10,588.25
35.79
240.25 _
8,569.56
8,483.69
3,507.74
735.20
5,974,057.808
643,289.344
2.63
-347.71
7/1012017 4:36:16PM
Page 7
COMPASS
5000.1 Build 81D
1
.,.. by vP
Final Survey Report BAF�UGHES
E .... piw
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project Prudhoe Bay
TVD Reference:
J -26A Actual @ 85.87usft (Parker 272 Actual)
She: PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well: J-28
North Reference:
True
Wellbore: J-28APBI
Survey Calculation Method:
Minimum Curvature
Design: J-28APB1
Database:
EDM RSK- Alaska PROD -ANCPi
Survey
MD Inc
AN (azimuth)
TVD
TVDSS
NIS
VIN
Northing
Easting
DLeg V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usR)
(usft)
(usft)
(°1100usft) (usft)
- .
10,630.03
36.87
239.91
8,603.22
8,517.35
3,495.39
713.75
5,974,045.057
643,268.132
2.63
-327.74
10,669.00
38.09
240.00
8,634.14
8,548.27
3,483.52
693.23
5,974,032.798
643,247.838
3.12
-308.63
7°
10,683.54
38.54
240.03
8,645.55
8,559.68
3,479.01
685.42
5,974,028.146
643,240.118
3.12
-301.36
10,716.37
41.28
237.19
8,670.74
8,584.87
3,468.03
667.45
5,974,016.827
643,222.364
10.02
-284.70
10,747.40
45.00
236.37
8,693.37
8,607.50
3,456.41
649.71
5,974,004.866
643,204.846
12.12
-268.34
10,777.75
47.88
238.09
8,714.29
8,628.42
3,444.51
631.22
5,973,992.623
643,186.583
10.34
-251.25
10,810.65
51.20
237.26
8,735.63
8,649.76
3,431.13
610.07
5,973,978.837
843,165.695
10.27
-231.69
10,842.08
54.58
237.57
8,754.59
8,668.72
3,417.63
588.95
5,973,964.944
643,144.840
10.78
-212.18
10,872.98
56.70
239.10
8,772.03
8,686.16
3,404.24
567.24
5,973,951.149
643,123.389
7.99
-192.06
10,907.12
60.02
239.58
8,789.94
8,704.07
3,389.43
542.24
5,973,935.860
643,098.677
9.80
-168.82
10,937.21
63.83
240.97
8,804.10
8,718.23
3,376.27
519.19
5,973,922.269
643,075.880
13.30
-147.35
10,967.31
67.41
240.47
8,816.52
8,730.65
3,362.86
495.28
5,973,908.410
643,052.232
11.99
-125.04
10,998.96
70.88
241.56
8,827.79
8,741.92
3,348.54
469.41
5,973,893.595
643,026.642
11.43
-100.89
11,031.66
74.06
242.94
8,837.64
8,751.77
3,334.02
441.82
5,973,878.561
642,999.333
10.52
-75.05
11,062.24
77.85
241.33
6,845.08
8,759.19
3,320.18
415.80
5,973,864.201
642,973.384
13.40
-50.50
11,094.24
81.36
240.11
8,850.83
8,764.96
3,304.76
388.15
5,973,848.291
642,946.236
11.59
-24.90
11,125.61
85.30
239.11
8,854.47
8,768.60
3,289.00
361.28
5,973,832.024
642,919.672
12.95
0.09
11,158.34
88.95
238.93
8,856.11
8,770.24
3,272.18
333.26
5,973,814.673
642,891.978
11.17
26.10
11,188.84
91.75
238.30
8,855.93
8,770.06
3,256.30
307.22
5,973,798.300
642,866.253
9.41
50.25
11,220.16
95.24
236.33
8,854.02
8,768.15
3,239.42
280.92
5,973,760.926
642,840.274
12.79
74.55
11,250.84
98.35
237.19
8,850.39
8,764.52
3,222.72
255.44
5,973,763.749
642,815.121
10.51
98.05
11,283.21
99.60
240.73
8,845.34
8,759.47
3,205.24
228.05
5,973,746.748
642,788.052
11.47
123.48
11,314.82
103.70
242.08
8,838.96
8,753.09
3,191.42
200.88
5,973,731.419
642,761.166
13.63
148.87
11,345.98
107.84
242.15
8,830.49
8,744.62
3,177.40
174.38
5,973,718.897
642,734.940
13.29
173.68
11,378.41
111.18
240.44
8,819.66
8,733.79
3,162.73
147.57
5,973,701.716
642,708.417
11.44
198.73
11,409.67
112.27
240.23
8,808.09
8,722.22
3,148.35
122.34
5,973,686.868
642,683.464
3.54
222,24
7/1012017 4:36'16PM
Page 6
COMPASS 5000.1 Build 81D
p%04 -
BP
Final Survey Report
BAKER
JUGHES
.GE -pi,
Company:
North America -ALASKA -BP
Local Co-ordinate Reference:
Well J-28
Project:
Prudhoe Bay
TVD Reference:
J -28A Actual@ 85.87usR(Parker 272 Actual)
Site:
PB J Pad
MD Reference:
J -28A Actual C 85.87usft (Parker 272 Actual)
Well:
J-28
North Reference:
True
Wellbore:
J-2aAP61
Survey Calculation Method:
Minimum Curvature
Design:
J-2aAPB1
Database:
EDM RSK-Alaska PROD -ANCP1
Survey
MD
Inc
Azi(azimuth)
TVD
TVDSS
NIS
PJW
Northing
Pasting
OL09
V. Sec
(usft)
(°)
1°)
(ush)
lush)
Wall) 1
(WSft)
(Waft)
(Waft)
(°NOOusR)
(UsR)
11,440.25
112.60
240.22
8,796.42
8,710.55
3,134.32
97.80
5,973,672.369
642,659.203
1.08
245.0E
11,523.02
111.84
238.79
8,765.12
8,679.25
3,095.43
31.78
5,973,632.240
842,593.939
1.84
306.47
11,584.05
110.82
237.55
8,742.92
8,657.05
3,065.45
-16.52
5,973,601.346
642,546.224
2.52
351.21
11,620.12
109.64
236.42
8,730.44
8,644.57
3,047.01
-44.89
5,973,582.371
642,518.203
4.40
377.4C
11,647.97
107.79
235.13
8,721.51
8,635.64
3,032.17
-66.70
5,973,567.124
642,496.684
7.96
39746
11,677.96
106.23
235.03
8,712.74
8,626.87
3,015.76
-90.21
5,973,550.265
642,473.488
5.21
419.04
11,713.83
104.86
234.04
8,703.12
8,617.25
2,995.71
-118.36
5,973,529.685
642,445.732
4.65
444.82
11,742.11
102.60
232.73
8,696.41
8,610.54
2,979.32
-140.41
5,973,512.885
642,424.001
9.17
464.95
11,772.03
100.19
231.80
8,690.50
8,604.63
2,961.37
-163.60
5,973,494.499
642,401.155
8.61
486.04
11,809.45
97.38
230.94
8,684.78
8,598.91
2,938.29
-192.49
5,973,470.871
642,372.716
7.85
512.24
11,838.08
95.34
230.77
8,681.61
8,595.74
2,920.32
-214.55
5,973,452.494
642,350.996
7.15
532.21
11,867.39
93.98
230.01
8,679.23
8,593.36
2,901.70
-237.06
5,973,433.447
642,328.851
5.31
552.54
11,901.30
94.14
230.06
8,676.83
8,590.96
2,879.97
-262.98
5,973,411.233
642,303.346
0.49
575.94
11,961.59
94.26
229.56
8,672.42
8,588.55
2,841.17
-308.91
5,973,371.568
642,258.163
0.85
617.36
12,055.55
92.68
228.66
8,666.73
8,580.86
2,779.78
-379.81
5,973,308.844
642,188.451
1.93
681.13
12,150.92
90.09
227.95
8,664.42
8,578.55
2,716.37
-451.00
5,973,244.095
642,118.490
2.82
744.96
12,245.98
90.23
227.64
8,664.16
8,578.29
2,652.51
-521.41
5,973,178.913
842,049.307
0.36
807.98
12,340.85
90.17
227.38
8,663.63
8,577.96
2,588.43
-591.37
5,973,113.520
641,980.587
0.28
870.52
12,433.94
90.26
227.78
8,66348
8,577.61
2,525.63
-660.09
5,973,049.436
641,913.078
0.44
931.97
12,529.49
90.14
227.58
8,663.14
8,577.27
2,461.30
-730.74
5,972,983.779
641,843.670
0.24
995.17
12,624.07
90.20
228.33
8,662.86
8,576.99
2,397.96
-800.97
5,972,919.119
641,774.656
0.80
1,058.07
12,718.68
90.36
228.45
8,662.40
8,576.53
2,335.14
-871.71
5,972,854.965
641,705.131
0.21
1,121.52
12,812.71
89.52
228.67
8,662.50
8,576.63
2,272.90
-942.20
5,972,791.410
641,635.843
0.92
1,184.79
12,907.76
89.13
228.60
8,663.62
8,577.75
2,210.09
-1,013.53
5,972,727.260
641,565.724
0.42
1,248.84
13,002.81
88.33
228.63
8,665.73
8,579.86
2,147.27
-1,084.83
5,972,663.098
641,495.640
0.84
1,312.85
13,096.30
86.35
226.89
8,670.07
8,584.20
2,084.50
-1,153.96
5,972,599.027
641,427.717
2.82
1,374.71
13,130.05
86.54
224.33
8,672.16
8,586.29
2,060.94
-1,178.03
5,972,575.014
641,404.102
7.59
1,396.07
7/10/2017 4.36:16PM Page 9
COMPASS 5000.1 Build 81D
e4o�.BP
�,♦a,= by Final Survey Report BAF IE
S
-11
Company:
North Amenca- ALASKA -BP
Project:
Prudhoe Bay
Site:
P8 J Pad
Well:
J-28
Wellbore:
J-28APB1
Design:
J-28APBI
Survey
MD
(usft)
13,161.58
13,190.73
13,225.34
13,256.24
13,285.21
13,320.01
13,351.13
13,378.91
13,413.59
13,474.56
13,508.14
13,537.55
13,569.08
13,611.00
Projection to TD
Casing Points
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method;
Database:
Well J-28
J-28AActual @ 85.87usft (Parker 272 Actual)
J -28A Actual Q 85.87usft (Parker 272 Actual)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Inc
AN (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
(in)
(in)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
1'1100usfo
(usft)
85.41
222.97
8,674.37
8,588.50
2,038.18
-1,199.74
5,972,551.850
641,382.831
5.60
1,415.16
85.62
222.76
8,676.65
8,590.78
2,016.88
-1,219.51
5,972,530.180
641,363.471
1.02
1,432.48
85.74
220.22
8,679.26
8,593.39
1,991.03
-1,242.37
5,972,503.902
641,341.107
7.33
1,452.39
85.37
220.27
8,681.65
8,595.78
1,967.51
-1,262.27
5,972,480.015
641,321.656
1.21
1,469.60
85.77
219.72
8,683.89
8,598.02
1,945.39
-1,280.84
5,972,457.541
841,303.517
2.34
1,485.64
86.27
219.43
8,686.31
8,600.44
1,918.63
-1,302.95
5,972,430.368
641,281.915
1.66
1,504.70
86.95
218.06
8,688.15
8,602.28
1,894.40
-1,322.40
5,972,405.776
641,262.938
4.91
1,521.38
87.01
216.81
8,689.61
8,603.74
1,872.37
-1,339.26
5,972,383.434
641,246.499
4.50
1,535.74
87.25
215.46
8,691.35
8,605.48
1,844.40
-1,359.68
5,972,355.080
641,226.611
3.95
1,552.98
88.79
214.89
8,693.45
8,607.58
1,794.59
-1,394.78
5,972,304.621
641,192.466
2.69
1,582.43
92.25
215.79
8,693.15
8,607.28
1,767.21
-1,414.20
5,972,276.872
641,173.572
10.85
1,598.75
95.05
216.64
8,691.28
8,605.41
1,743.53
-1,431.54
5,972,252.871
641,156.688
9.95
1,613.40
96.78
217.63
8,688.03
8,602.16
1,718.53
-1,450.47
5,972,227.516
641,138.236
6.31
1,629.48
96.78
217.63
6,683.08
8,597.21
1,685.56
-1,475.89
5,972,194.074
641,113.454
0.00
1,651.15
Measured
Vertical
Casing
Hole
Depth
Depth
Diameter
Diameter
(usft)
(usft) Name
(in)
(in)
2,954.21
2,953.56 95/8"
9.625
12.250
10,669.00
8,634.14 7"
7.000
7.500
7/1072017 4:36.16PM Page 10 COMPASS 5000.1 Budd 81D
e*00S
BP
Z00*0S by
Final Survey Report
Deptl1
Dip Direction
Company: North America -ALASKA - BP
Local Co-ordinate Reference:
Project: Prudhoe Bay
TVD Reference:
Site: PB J Pad
MD Reference:
Well: J-28
North Reference:
Wellbore: J-28APB1
Survey Calculation Method:
Design: J-28APBi
Database:
Formations
5,094.07
Measured
Vertical
Dip
Depth
Deptl1
Dip Direction
(usft)
(
(usft)
Name Lithology
9,258.00
7,347.60
TKNG
7,462.00
5,789.05
CM3
4,888.00
4,422.98
UG3
6,153.00
5,094.07
UG1
3,293.00
3,283.61
SV2
7,796.00
5,997.37
CM2
6,682.00
5,375.86
WEST SAK2
10,667.00
8,632.57
TSGR
4,361.00
4,140.35
UG4A
7,055.00
5,573.51
WEST SAK 1
3,714.00
3,665.66
SV1
10,837.00
8,751.63
TSAD
2,952.21
2,951.57
SV4
9,142.00
7,232.48
LCU/TMLV
10,719.00
8,672.71
SHUBLIK
8,943.00
7,034.08
CM1
4,301.00
4,104.42
UG4
3,153.00
3,149.08
SV3
BAKER
gUGHES
GE�wnpany
Well J-28
J -28A Actual@ 85.87usft (Parker 272 Actual)
J-211AActual @ 85.87usft (Parker 272 Actual)
True
Minimum Curvature
EDM R5K- Alaska PROD - ANCP1
Design Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
NU -3 •¢/-W
(usft)
(usft)
(usft) (usft) Comment
2,908.76
2,908.32
8.46 -10.01 TIP
2,953.00
2,952.36
10.52 -13.67 KOP-TOWS
13,611.00
8,683.08
1,885.56 -1,475.89 Projection to TD
Prepared By: Yoshe Ragbirsingh Survey Manager Baker Hughes a GE Company
7/10/2017 4:36.16PM Page 11
COMPASS 50001 Build 81D
North America - ALASKA - BP
Prudhoe Bay
PB J Pad
J-28
J -28A
500292172101
Design: J -28A
Final Survey Report
11 July, 2017
BA ER
F IGHES
BAT
GE company
:r�4a1
by
BP
,,,,,,:
Final Survey Report
BA4UGHES R
Emmpa
Company: North America -ALASKA - BP
Project: Prudhoe Bay
Local Co-ordinate Reference:
Well J-28
Site: PB J Pad
TVD Reference:
J -28A Actual @ 85.87usft (Parker 272 Actual)
Well: J-28
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual
Wellbore: J -28A
North Reference:
True
Survey Calculation Method:
Minimum Curvature '
Design: J -28A
Database:
EDM RSK- Alaska PROD -ANCP1
Project Prudhoe Bay, GPB, PRUDHOE BAY
Map System: Alaska NAD27 State Plane Zones
Goo Datum: NAD27. OGP-Usa AK [4267.15864]
System Datum:
Mean Sea Level
Using Well Reference Point
Map Zone: NA027 •OGP-Usa AK / Alaska zone 4 [26734.1588•
Using geodetic scale factor
Sib PB J Pad, TR-11-13�
SitPosition:
Northing:
5,988,224.220 usft Latitutla:
70° 19'14 845 N-
From:
Fromo MaP
Easting:
641,155.790 usft Longitude:
148'51'20,092 W
Position Uncertainty: 0.00 usft _ _ _
_ Slot Radius:
0.000 in Gdtl Convergence:
- —
1.08 °
J
Well J-28, J-28
Well Position +N/ -S 0.00 usft
Northing:
5,970,537.000 usft
Latitude:
70' 19'37.316 N
+EI -W 0.00 usft
Easting:
642,621.000 usft
Longitude:
148° 50' 36.055 W
LPosition Uncertainty 0.00 usft
Wellhead Elevation: 39.52 usft
Ground Level
39.07usft
Wellbore J -28A -
-
- - - -
Magnetics Model Name Sample Dab
Declination
Dip Angle Field Strength
r)
(I (nT)
BGGM2016 7/1/2017
17.78
81.01 57,551
--
Design J -26A
- -
-
-- - --
Audit Notes:
Version: 1.0 Phase: ACTUAL
Tie On Depth: 11,283.21
Vertical Section: Depth From (ND)
+NI.B
+E7 -W Direction
("It)
lust)
(usft) 1°)
46.35
0.00
0.00 277.75
7111201710.26.45AM
Page 2
COMPASS 5000.1 Build 81D
BP
s,, by Final Survey Report BT
HUGHES
E,..,,
Company: North America - ALASKA - BP
Project Prudhoe Bay
She: PB J Pad
Well: J-28
MWD+IFR+MS-WOCA
Wellbore: J -28A
EIW
Design: J -28A
Easting
Survey Program
Date 7/11/2017
From
To
(usft)
(usft) Survey (Wellbore)
108.76
2,908.76 J-28 Srvy 1 BOSS -MS (J-28PB7)
2,953.00
3,706.00 Gyrodata SS 8-1/2" (J-28APB7)
3,801.81
10,630.03 BHI ATK MWD 8-1/7X9-7/8"(J-28APB7)
10,683.54
11,283.21 BHI OTK MWO 6-1/8"(J-28APB7)
11,302.76
15,706.98 BHI OTK MWD 6 -1/8"(J -28A)
Survey
0.00
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Tool Name Descdptlon
BOSS -GYRO Sperry -Sun BOSS gyro muleshot
GYD-GC-SS Gyrodate gyro single shots
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
MWD+IFR+MS-WOCA
MWD +IFR+Mufti Station W/O Crustal
VW11 J-28
J-28AActual @ 85.87usft (Parker 272 Actual)
J -20A Actual Q 85.87usft (Parker 272 Actual)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
MD
Inc
AN (azimu0t)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
(usft)
(1
11
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(9100usft)
46.35
0.00
0.00
46.35
-39.52
0.00
0.00
5,970,537.000
642,621.000
0.00
108.76
0.18
129.40
108.76
22.89
-0.06
0.08
5,970,536.939
642,621.077
0.29
208.76
0.13
87.19
208.76
122.89
-0.16
0.31
5,970,536.850
642,621.313
0.12
308.76
0.18
125.70
308.76
222.89
-0.24
0.55
5,970,536.768
642,621.556
0.11
408.76
0.10
62.80
408.76
322.89
-0.29
0.76
5,970,536.720
642,621.762
0.16
508.76
0.13
94.61
508.76
422.89
-0.26
0.95
5,970,536.755
642,621.952
0.07
608.76
0.12
156.50
606.76
522.89
-0.37
1.10
5,970,536.652
642,622.109
0.13
708.76
0.08
86.60
708.76
622.89
-0.46
1.21
5,970,536.563
642,622,222
0.12
808.76
0.10
72.80
808.76
722.89
-0.43
1.37
5,970,536.596
642,622.374
0.03
908.76
0.10
119.31
908.76
822.89
445
1.53
5,970,536.582
642,622.534
0.08
1,008.76
0.00
0.00
1,008.76
922.89
-0.49
1.60
5,970,536.540
642,622.611
0.10
1,108.76
0.25
352.61
1,108.76
1,022.89
-0.27
1.57
5.970,536.756
642,622.579
0.25
1,208.76
0.05
356.50
1,208.76
1,122.89
-0.01
1.54
5,970,537.015
642,622.543
0.20
1,308.76
0.10
12.89
1,308.76
1,222.89
0.11
1.56
5,970,537.144
642,622.558
0.05
1,408.76
0.02
177.11
1,408.76
1,322.89
0.18
1.58
5,970,537.212
642,622.577
0.12
1,508.76
0.15
287.70
1,508.76
1,422.89
0.20
1.46
5,970,537.232
642,822.452
0.16
1,608.76
0.18
258.30
1,608.76
1,522.89
0.21
1.18
5,970,537.235
642,622.174
0.09
1,708.76
0.10
292.00
1,708.76
1,622.89
0.21
0.94
5,970,537.231
642,621.939
0.11
1,808.76
0.22
262.30
1,808.76
1,722.89
0.22
0.67
5,970,537.233
642,621.668
0.14
V. Sec
(usly
0.00
-0.08
-0.33
-0.58
-0.79
-0.97
-1.14
-1.26
-1.41
-1.57
-1.65
-1.60
-1.53
-1.53
-1.54
-1.42
-1.14
-0.91
-0.64
711112017 1026.45AM Page 3 COMPASS 5000.1 Build 01D
p00,,.,E
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB J Pad
Well:
J-28
Wellbore:
J -28A
Design:
J -28A
Survey
MD
(usf )
1,908.76
2,008.76
2,108.76
2,208.76
2,308.76
2,408.76
2,508.76
2,608.76
2,676.76
13 318"
2,708.76
2,758.76
2,608.76
2,858.76
2,908.76
2,953.00
2,954.21
9 618"
2,967.00
2,999.00
3,035.00
3,065.00
3,095.00
3,126.00
3,216.00
3,246.00
3,276.00
BP
AN (azimuth)
Final Survey Report
BAT
UGHES
Nis
rWmw"y
Local Co-ordinate Reference:
WWII J-28
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Inc
AN (azimuth)
TVD
TVDSS
Nis
ENV
Northing
Essting
DLeg
V. Sec
7.15
322.01
Wait)
(usft)
just)usft
( )
(usft'
(uaR)
(11100u8111)
(usft)
0.22
318.11
1,908.76
1,822.89
0.34
0.35
5,970,537.344
642,621.347
0.21
-0.31
0.28
341 AD
2,008.75
1,922.88
0.71
0.15
5,970,537.715
642,621.134
0.12
-0.051
0.33
346.00
2,108.75
2,022.88
1.22
0.00
5,970,538.223
642,620.977
0.06
0.16
0.12
355.40
2,208.75
2,122.88
1.61
-0.08
5,970,538.605
642,620.891
0.21
0.29
0.07
315.50
2,308.75
2,222.88
1.75
-0.13
5,970,538.752
642,620.637
0.08
0.36
0.10
25.30
2,408.75
2,322.88
1.88
-0.13
5,970,538.874
642,620.830
0.10
0.39
0.10
154.40
2,508.75
2,422.88
1.88
-0.06
5,970,538.876
642,620.905
0.18
0.31
0.18
102.40
2,608.75
2,522.88
1.77
0.13
5,970,538.767
642,621.098
0.14
0.11
0.09
32.99
2,676.75
2,590.88
1.79
0.26
5,970,538.792
642,621.231
0.25
-0.02
0.13
355.40
2,708.75
2,622.88
1.84
0.28
5,970,538.849
642,821.241
0.25
-0.02
2.88
308.11
2,758.73
2,672.86
2.68
-0.72
5,970,539.662
642,620.232
5.59
1.07
4.02
303.40
2,808.64
2,722.77
4.42
-3.17
5,970,541.355
642,617.748
2.35
3.74
4.57
300.40
2,858.50
2,772.63
6.39
-6.35
5,970,543.267
642,614.530
1,19
7,15
5.07
298.70
2,908.32
2,822.45
8.46
-10.01
5,970,545.266
842,610.836
1.04
11.06
5.83
300.05
2,852.36
2,868.49
10.52
-13.87
5,970,547.280
842,807.138
1.74
14.96
5.82
301.58
2,953.56
2,867.69
10.59
-13.77
5,970,547.321
642,607.031
12.89
15.071
5.92
317.73
2,966.29
2,880.42
11.41
-14.77
5,970,548.129
642,606.020
12.89
16.17
7.15
322.01
2,998.08
2,912.21
14.20
-17.10
5,970,550.875
642,603.632
4.13
18.86
9.32
326.01
3,033.71
2,947.84
18.39
-20.11
5,970,555.000
642,600.544
6.23
22.41
11.12
329.72
3,063.23
2,977.36
22.90
-22.93
5,970,559.458
642,597.642
6.39
25.81
12.42
333.01
3,092.60
3,006.73
28.27
-25.85
5,970,564.774
642,594.617
4.88
29.43
13.16
335.35
3,122.83
3,036.96
34.45
-28.84
5,970,570.894
642,591.516
2.91
33.22
15.80
346.72
3,209.98
3,124.11
55.70
-35.93
5,970,591.998
642,584.024
4.30
43.11
16.86
350.15
3,238.77
3,152.90
63.96
-37.61
5,970,600.226
642,582.184
4.78
45.89
17.50
351.46
3,267.43
3,181.56
72.70
-39.02
5,970,608.944
642,580.604
2.49
48.47
771112017 10:26.45AM Page 4 COMPASS 5000.1 Build 81D
Z
b p
i
TVD
Company:
North America -ALASKA - BP
Project
Prudhoe Bay
Site:
PB J Pad
Well:
J-28
Wellbore:
J -28A
Design:
J -28A
Survey
BP
Final Survey Report
Local Co-ordinate Reference:
TVD Reference:
MO Reference:
North Reference:
Survey Calculation Method:
Database:
BAKER
gUGHES
er.°, .,
Well J-28
J-28AActual 0 85.87usft (Parker 272 Actual)
J -28A Actual @ 85.87usft (Parker 272 Actual)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
MD
Inc
Azi(azimuth)
TVD
TVDSS
N/S
ENV
Northing
Easting
DLeg
V. Sao
lush)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100 ism
(usft)
3,306.00
18.86
353.72
3,295.93
3,210.05
81.99
-40.22
5,970,618.200
642,579.228
5.11
50.91
3,338.00
19.73
353.70
3,324.25
3,238.38
91.84
41.31
5,970,628.030
642,577.955
2.90
53.32
3,406.00
22.08
357.62
3,389.64
3,303.77
116.73
43.15
5,970,652.882
642,575.639
3.91
58.50
3,506.00
24.59
4.14
3,481.47
3,395.60
156.28
42.43
5,970,692.429
642,575.609
3.60
63.12
3,606.00
27.53
9.21
3,571.30
3,485.43
199.86
-37.23
5,970,738.097
642,579.982
3.69
63.84
3,706.00
30.46
12.95
3,658.77
3,572.90
247.38
-27.85
5,970,783.792
642,588.458
3.44
60.95
3,801.81
32.23
12.39
3,740.59
3,654.72
296.01
-16.92
5,970,832.612
642,598.456
1.87
56.68
3,865.93
34.83
13.63
3,794.04
3,708.17
330.51
-8.94
5,970,867.256
642,605.784
4.19
53.42
3,960.44
39.21
15.07
3,669.48
3,783.61
385.61
5.20
5,970,922.613
642,618.867
4.72
46.85
4,055.57
43.83
15.81
3,940.69
3,854.82
446.38
22.00
5,970,983.679
642,634.509
4.88
38.40
4,149.28
47.24
16.40
4,006.32
3,920.45
510.62
40.56
5,971,048.256
642,651.842
3.67
28.67
4,243.75
50.29
17.18
4,068.58
3,982.71
578.62
61.09
5,971,116.631
642,671.074
3.29
17.50
4,339.62
53.49
18.13
4,127.74
4,041.87
650.48
83.97
5,971,188.913
642,692.590
3.43
4.51
4,434.38
56.88
19.03
4,181.84
4,095.97
724.21
108.77
5,971,263.092
642,715.978
3.66
-10.12
4,529.38
58.04
19.13
4,232.94
4,147.07
799.90
134.95
5,971,339.255
642,740.712
1.22
-25.85
4,624.25
57.99
19.00
4,283.19
4,197.32
875.95
161.23
5,971,415.789
642,765.544
0.13
41.64
4,719.07
57.95
18.80
4,333.48
4,247.61
952.00
187.27
5,971,492.316
642,790.130
0.18
-57.18
4,813.53
58.06
19.23
4,383.53
4,297.66
1,027.74
213.37
5,971,568.532
642,814.785
0.40
-72.83
4,907.71
57.94
20.09
4,433.43
4,347.56
1,102.95
240.24
5,971,644.236
642,840.219
0.78
-89.32
5,001.45
57.97
20.23
4,483.17
4,397.30
1,177.54
267.63
5,971,719.326
642,866.179
0.13
-106.39
5,096.94
58.02
19.91
4,533.78
4,447.91
1,253.60
295.42
5,971,795.893
642,892.514
0.29
-123.67
5,191.76
58.08
19.87
4,583.96
4,498.09
1,329.26
322.79
5,971,872.050
642,918.441
0.07
-140.59
5,286.22
58.07
19.70
4,633.91
4,548.04
1,404.70
349.93
5,971,947.986
642,944.138
0.15
-157.31
5,380.85
58.02
19.22
4,683.99
4,598.12
1,480.40
376.68
5,972,024.178
642,969.441
0.43
-173.60
5,475.24
58.06
19.21
4,733.96
4,648.09
1,556.02
403.03
5,972,100.280
642,994.353
0.04
-189.52
5,570.10
57.95
19.66
4,784.22
4,698.35
1,631.89
429.80
5,972,176.635
643,019.672
0.42
-205.81
5,664.58
56.05
19.91
4,834.28
4,748.41
1,707.28
456.92
5,972,252.525
643,045.353
0.25
-222.52
7/11/2017 10.26.45AM Page 5 COMPASS 5000.1 Build BID
p BA <
,� Final Survey Report UGER
HES
a GE,umpa,
Company:
North America -ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project-
Prudhoe Bay
TVD Reference:
J-28AActual @ 85.87usR (Parker 272 Actual)
Sire:
PB J Pad
MD Reference:
J -28A Actual @ 85.87usR (Parker 272 Actual)
Well:
J-26
North Reference:
True
Wellbore:
J -28A
Survey Calculation Method:
Minimum Curvature
Design'
J -28A
Database:
EDM RSK- Alaska PROD -ANCPI
Surrey
57.93
19.66
4,883.96
MD
Inc
AN (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
Waft)
(°)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usR)
(°1100usft)
(usft)
5,758.29
57.93
19.66
4,883.96
4,798.09
1,782.05
483.82
5,972,327.788
643,070.823
0.28
-239.09
5,853.62
57.76
19.31
4,934.69
4,848.82
1,858.14
510.74
5,972,404.365
643,096.290
0.36
-255.50
5,947.16
57.75
19.33
4,984.60
4,898.73
1,932.79
536.91
5,972,479.502
643,121.039
0.02
-271.37
6,042.58
57.94
19.89
5,035.38
4,949.51
2,008.89
564.03
5,972,556.095
643,146.698
0.54
-267.97
6,137.28
57.86
19.81
5,085.71
4,999.84
2,084.35
591.27
5,972,632.049
643,172.497
0.11
-304.79
6,231.80
57.80
20.58
5,136.03
5,050.16
2,159.44
618.89
5,972,707.644
643,198.682
0.69
-322.03
6,326.45
57.84
21.05
5,186.44
5,100.57
2,234.32
647.35
5,972,783.047
643,225.719
0.42
-340.14
6,421.21
57.76
21.50
5,236.94
5,151.07
2,309.04
676.45
5,972,858.301
643,253.386
0.41
-358.89
6,515.82
57.83
21.42
5,287.36
5,201.49
2,383.54
705.74
5,972,933.342
643,281.250
0.10
-377.87
6,610.67
57.61
21.61
5,337.88
5,252.01
2,458.23
735.18
5,973,008.568
643,309.265
0.17
-396,97
6,705.55
57.84
21.23
5,388.40
5,302.53
2,532.99
764.51
5,973,063.868
643,337.165
0.34
-415.95
6,800.35
58.02
21.27
5,438.73
5,352.86
2,607.86
793.62
5,973,159.273
643,364.850
0.19
-434.70
6,895.33
58.02
20.85
5,469.04
5,403.17
2,683.04
822.57
5,973,234.988
643,392.365
0.38
-453.25
6,990.61
58.09
20.57
5,539.45
5,453.58
2,758.67
851.16
5,973,311.138
843,419.511
0.26
471.38
7,084.76
58.02
20.00
5,589.27
5,503.40
2,833.81
878.66
5,973,386.581
643,445.778
0.52
488.72
7,178.86
58.00
19.61
5,639.12
5,553.25
2,908.70
905.90
5,973,462.165
643,471.385
0.35
-505.39
7,273.57
58.06
19.90
5,689.27
5,603.40
2,984.31
933.06
5,973,538.277
643,497.097
0.27
-522.10
7,368.22
58.04
20.26
5,739.35
5,653.48
3,059.74
960.63
5,973,614.212
643,523.229
0.32
-539.25
7,462.90
57.95
20.89
5,789.53
5,703.66
3,134.91
988.85
5,973,689.895
643,550.009
0.57
-557.07
7,558.10
54.24
20.38
5,842.63
5,756.76
3,208.84
1,016.70
5,973,764.333
643,576.444
3.92
-574.70
7,652.77
50.19
19.58
5,900.62
5,814.75
3,279.13
1,042.27
5,973,835.097
643,600.674
4.33
-590.56
7,747.58
46.65
19.36
5,963.53
5,877.66
3,345.98
1,065.91
5,973,902.382
643,623.036
3.74
-604.96
7,841.74
42.85
18.06
6,030.39
5,944.52
3,408.75
1,087.19
5,973,965.535
643,643.121
4.15
-617.59
7,936.32
39.34
17.43
6,101.66
6,015.79
3,467.95
1,106.15
5,974,025.077
643,660.947
3.74
-628.39
8,031.73
35.52
16.19
6,177.41
6,091.54
3,523.44
1,122.94
5,974,080.873
643,676.681
4.08
-637.54
8,126.03
31.74
15.56
6,255.91
6,170.04
3,573.56
1,137.24
5,974,131.352
643,690.019
4.03
-644,94
8,221.25
- 28.17
15.35
6,338.40
6,252.53
3,619.47
1,149.91
5,974,177.398
643,701.818
3.75
-651.32
7/11/2017 10.26'45AM
Page 6
COMPASS
5000.1 Build 81D
BP
Final Survey Report
BAKER 01
gUGHES
�e�a„wro
Company:
North America -ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project:
Prudhoe Bay
ENV
Northing
Easting
DLeg
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Site:
PB J Pad
MD Reference:
J -28A Actual @ 85.87usft (Parker 272 Actual)
Well:
J-28
North Reference:
True
Wellbore:
J -28A
Survey Calculation Method:
Minimum Curvature
Design:
J -28A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
AN (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(ust)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
8,315.86
24.05
15.74
6,423.34
6,337.47
3,659.58
1,161.06
5,974,217.708
643,712.199
4.36
-656.9'.
8,411.18
19.75
15.68
6,511.76
6,425.89
3,693.81
1,170.68
5,974,252.106
643,721.174
4.50
-661.8E
8,505.50
15.37
16.01
6,601.66
6,515.79
3,721.19
1,178.44
5,974,279.626
643,728.412
4.66
-665.87
8,599.19
11.61
15.27
6,692.74
6,606.87
3,742.22
1,184.35
5,974,300.770
643,733.920
4.02
-668.85
8,693.63
8.58
10.08
6,785.71
6,699.84
3,758.33
1,188.09
5,974,316.944
843,737.349
3.35
-670.42
8,789.04
4.99
357.46
6880.45
6,794.58
3,769.49
1,189.15
5,974,328.118
643,738.199
4.05
-669.97
8,882.69
3.52
308.60
6,973.86
6,887.99
3,775.35
1,186.72
5,974,333.935
643,735.660
4.02
-666.77
8,977.77
3.65
253.20
7,068.76
6,982.91
3,776.30
1,181.54
5,974,334.783
643,730.464
3.51
-661.51
9,073.37
4.61
241.15
7,164.14
7,078.27
3,773.56
1,175.27
5,974,331.931
643,724.239
1.35
-655.66
9,167.99
6.26
240.14
7,258.33
7,172.46
3,769.16
1,167.46
5,974,327.380
643,716.520
1.75
-648.52
9,262.81
8.43
240.00
7,352.36
7,266.49
3,763.11
1,156.96
5,974,321.132
643,706.134
2.29
-638.93
9,357.28
10.16
239.08
7,445.59
7,359.72
3,755.37
1,143.81
5,974,313.140
643,693.138
1.84
-626.95
9,451.97
12.21
239.36
7,538.48
7,452.61
3,745.97
1,128.03
5,974,303.447
643,677.539
2.17
-612.58
9,546.84
14.34
239.92
7,630.81
7,544.94
3,734.97
1,109.23
5,974,292.090
643,658.953
2.25
-595.43
9,641.31
16.67
238.45
7,721.83
7,635.96
3,722.01
1,087.56
5,974,278.726
643,637.532
2.50
-575.71
9,735.74
18.51
236.75
7,611.84
7,725.97
3,706.71
1,063.48
5,974,262.966
643,613.749
2.02
-553.91
9,830.25
20.22
236.69
7,901.00
7,815.13
3,689.51
1,037.28
5,974,245.276
643,587.885
1.81
-530.27
9,924.12
22.12
237.63
7,988.53
7,902.66
3,671.14
1,008.79
5,974,226.367
643,559.755
2.06
-504.52
10,019.80
24.08
238.82
8,076.54
7,990.67
3,651.39
976.88
5,974,206.013
643,528.221
2.11
-475.56
10,114.46
26.08
238.92
8,162.27
8,076.40
3,630.64
942.53
5,974,184.624
643,494.279
2.11
-444.32
10,209.75
28.04
239.07
8,247.12
8,161.25
3,608.32
905.37
5,974,161.596
643,457.558
2.06
410.52
10,303.83
29.41
238.64
8,329.63
8,243.76
3,584.93
866.66
5,974,137.479
643,419.317
1.47
-375.33
10,398.92
31.39
239.59
8,411.64
8,325.77
3,560.24
825.38
5,974,112.012
643,378.499
2.14
-337.74
10,493.16
33.31
239.64
8,491.25
8,405.38
3,534.74
781.88
5,974,085.687
643,335.496
2.04
-298.08
10,588.25
35.79
240.25
8,569.56
8,483.69
3,507.74
735.20
5,974,057.808
643,289.344
2.63
-255.47
10,630.03
36.87
_ 239_91
8,603.22
8,517.35
3,495.39
713.75
5,974,045.057
643,268.132
2.63
-235.88
7/112017 10:26:45AM Page 7 COMPASS 5000 1 Build 81D
pS�4ea
ry
Final Survey Report
BA ER
1UGIiES
eeGomvaw
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project:
Prudhoe Bay
5,974,028.146
643,240.118
3.12
-210.01
TVD Reference:
J -28A Actual @ 85.87usft (Parker 272 Actual)
Site:
PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well.
J-28
North Reference:
True
Wellbore:
J -28A
Survey Calculation Method:
Minimum Curvature
Design:
J -28A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
(us1R
10,669.00
7-
10,683.54
10,716.37
10,747.40
10,777.75
10,810.65
10,842.08
10,872.98
10,907.12
10,937.21
10,987.31
10,998.96
11,031.66
11,062.24
11,094.24
11,125.61
11,158.34
11,188.84
11,220.16
11,250.84
11,283.21
71P to J-28AP81
11,302.76
11,334.38
11,366.23
11,395.00
Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easgng DLeg V. Sec
(°) 0 lust) lust) (ust) (ase) (usR) (usR) r1laousft) (usR)
38.09 240.00 8,634.14 6,548.27 3,483.52 693.23 5,974,032.798 643,247.838 3.12 -217.14
38.54
240.03
8,645.55
8,559.68
3,479.01
685.42
5,974,028.146
643,240.118
3.12
-210.01
41.28
237.19
8,670.74
8,584.87
3,468.03
667.45
5,974,016.827
643,222.364
10.02
-193.69
45.00
236.37
8,693.37
8,607.50
3,456.41
649.71
5,974,004.866
643,204.846
12.12
-177.67
47.88
238.09
8,714.29
8,628.42
3,444.51
631.22
5,973,992.623
643,186.583
10.34
-160.95
51.20
237.26
8,735.63
8,649.76
3,431.13
610.07
5,973,978.837
643,165.695
10.27
-141.80
54.58
237.57
8,754.59
8,668.72
3,417.63
588.95
5,973,964.944
643,144.840
10.78
-122.70
56.70
239.10
8,772.03
8,686.16
3,404.24
567.24
5,973,951.149
643,123.389
7.99
-102.99
60.02
239.58
8,769.94
8,704.07
3,389.43
542.24
5,973,935.860
643,098.677
9.80
-80.22
63.83
240.97
8,804.10
8,718.23
3,376.27
519.19
5,973,922.269
643,075.880
13.30
-59.15
67.41
240.47
8,816.52
6,730.65
3,362.86
495.28
5,973,908.410
643,052.232
11.99
-37.27
70.88
241.56
8,827.79
8,741.92
3,348.54
469.41
5,973,893.595
643,026.642
11.43
-13.57
74,06
242.94
8,837.64
8,751.77
3,334.02
441.82
5,973,878.561
642,999.333
10.52
11.81
77.85
241.33
8,845.06
8,759.19
3,320.16
415.60
5,973,864.201
842,973.384
13.40
35.92
81.36
240.11
8,850.83
8,764.96
3,304.76
388.15
5,973,848.291
642,946.236
11.59
61.05
85.30
239.11
8,854.47
8,768.60
3,289.00
361.28
5,973,832.024
642,919.872
12.95
85.55
88.95
238.93
8,856.11
8,770.24
3,272.18
333.26
5,973,814.673
642,891.978
11.17
111.04
91.75
238.30
8,855.93
8,770.06
3,256.30
307.22
5,973,798.300
642,866.253
9.41
134.70
95.24
236.33
6,854.02
8,768.15
3,239.42
280.92
5,973,780.926
642,840.274
12.79
158.49
98.35
237.19
8,850.39
8,764.52
3,222.72
255.44
5,973,763.749
642,815.121
10.51
181.48
99.80
240.73
8,845.34
8,759.47
3,206.24
228.05
5,973,746.748
642,788.052
11.47
206.40
101.38
242.63
8,841.78
8,755.91
3,197.12
211.13
5,973,737.309
642,771.310
13.20
221.93
102.18
243.24
8,835.32
8,749.45
3,183.04
163.57
5,973,722.704
642,744.021
3.16
247.34
103.47
242.76
8,828.25
8,742.38
3,168.94
155.90
5,973,708.084
642,716.626
4.31
272.86
104.89
242.65
8,821.21
8,735.34
3,156.15
131.11
5,973,694.825
642,692.088
4.95
295.70
7/112017 10:26:45AM Page 8 COMPASS 5000.1 Build 81D
0,100 BP
iAV♦�I p Final Survey Report BA UGHES
.GE00,,
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well J-28
Project:
Prudhoe Bay
ENV
Northing
Easting
131.e9
TVD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Site:
PB J Pad
MD Reference:
J-28AActual Q 85.87usft (Parker 272 Actual)
Well
J-28
North Reference:
True
Wellbore:
J -28A
Survey Calculation Method:
Minimum Curvature
Design:
J -28A
Database:
EDM RSK- Alaska PROD -ANCP7
Survey
MD
Inc
AM (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
131.e9
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usR)
(usR)
(usft)
(usft)
(°HOOusft)
(usft)
11,430.51
106.17
242.37
8,811.70
8,725.83
3,140.35
100.76
5,973,678.460
642,662.046
3.68
323.64
11,460.86
107.55
242.27
8,802.90
8,717.03
3,126.86
75.04
5,973,664.483
642,636.588
4.56
347.31
11,489.39
109.36
241.95
8,793.87
8,708.00
3,114.20
51.12
5,973,651.373
642,612.917
6.43
369.30
11523.58
111.32
241.93
8,781.98
8,696.11
3,099.12
22.83
5,973,835.760
642,584.922
5.73
395.30
11,554.77
111.27
241.53
8,770.65
8,684.78
3,085.36
-2.76
5,973,621.513
642,559.596
1.21
418.80
11,583.60
111.08
241.39
8,760.24
8,674.37
3,072.52
-26.38
5,973,608.224
642,536.229
0.80
440.47
11,679.49
107.45
240.75
8,728.61
8,642.74
3,028.73
-105.59
5,973,562.944
642,457.874
3.84
513.05
11,712.23
105.48
239.93
8,719.33
8,633.46
3,013.19
-132.87
5,973,546.892
642,430.895
6.48
537.99
11,743.20
104.47
239.51
8,711.33
8,625.46
2,998.11
-158.70
5,973,531.319
642,405.352
3.51
561.55
11,773.32
103.33
239.31
8,704.09
8,618.22
2,983.23
-183.87
5,973,515.966
642,380.473
3.84
584.48
11,806.49
100.82
237.63
8,697.15
8,611.28
2,966.27
-211.51
5,973,498.483
642,353.160
9.04
609.59
11,837.49
98.46
236.74
6,691.96
8,606.09
2,949.70
-237.20
5,973,481.437
842,327.798
8.12
632.80
11,868.08
97.16
234.60
8,687.80
8,801.93
2,932.81
-262.22
5,973,463.875
642,303.105
8.13
655.29
11,900.99
97.03
233.10
8,683.74
8,597.87
2,913.35
-288.59
5,973,444.114
842,277.108
4.54
678.82
11,933.56
97.00
232.10
8,679.76
8,593.89
2,893.72
-314.27
5,973,423.997
642,251.608
3.05
701.62
11,963.19
96.18
231.24
8,676.36
8,590.49
2,875.46
-337.36
5,973,405.308
642,229.072
4.00
722.04
11,997.08
95.16
231.21
8,673.01
8,587.14
2,854.34
-363.65
5,973,383.694
642,203.189
3.01
745.24
12,026.91
93.98
231.19
8,670.64
8,584.77
2,835.71
-386.83
5,973,364.627
642,180.375
3.96
765.69
12,057.77
92.97
230.58
8,668.76
8,582.89
2,816.28
410.72
5,973,344.745
642,156.852
3.82
786.75
12,090.41
93.15
229.94
8,687.02
8,581.15
2,795.44
435.79
5,973,323.436
842,132.192
2.03
808.77
12,121.95
92.65
229.86
8,665.43
8,579.56
2,775.15
459.88
5,973,302.694
642,108.489
1.61
829.91
12,151.01
92.13
229.44
8,664.21
8,578.34
2,756.35
482.01
5,973,283.480
642,086.724
2.30
849.30
12,246.20
90.10
227.66
8,662.36
8,576.49
2,693.36
-553.34
5,973,219.145
642,016.613
2.84
911.48
12,340.31
90.11
226.87
8,662.19
8,576.32
2,629.49
-622.46
5,973,153.985
641,948.721
0.84
971.36
12,434.47
90.23
226.74
8,661.91
8,576.04
2,565.04
-691.11
5,973,088.246
641,881.319
0.19
1,030.69
12,527.89
90.20
226.71
8,661.56
8,575.69
2,501.00
-759.12
5,973,022.930
641,814.537
0.05
1,089.45
12,622.43
90.23
226.52
8,661.21
8,575.34
2,436.06
-627.83
5,972,956.702
641,747.083
0.20
1,148.77
711112017 10:26.45AM Page 9 COMPASS 50001 Build 810
?e 4�BP
%0 by Final Survey BAKER
Report JUGHES
ace �omvaw
Company:
North Amerim- ALASKA -BP
Local Co-ordinate Reference:
project
Prudhoe Bay
ENV
Site:
PB J Pad
TVD Reference:
MD Reference:
Well:
J-28
(usft)
Wait)
(usR)
North Reference:
Wellbore:
J -28A
Survey Calculation Method:
Design:
J -28A
Database:
Survey
2,370.53
-896.88
MD Inc
(usR) 1°)
12,717.63
12,811.93
12,846.48
12,879.20
12,906.96
13,000.87
13,034.35
13,066.04
13,096.48
i
13,128.86
13,160.58
13,190.60
13,285.38
13,319.04
13,348.97
13,380.28
13,412.70
13,444.36
13,474.62
13,538.68
13,569.17
13,601.84
13,633.57
13,663.51
13,699.56
13,728.38
13,758.25
Well J-28
J-28AActual @ 85.87usft (Parker 272 Actual)
J -28A Actual @ 85.87usft (Parker 272 Actual)
True
Minimum Curvature
EDM R5K- Alaska PROD - ANCP1
V. Sec
)usR)
1,208.35
1,267.38
1,289.00
1,309.36
1,326.50
1,383.49
1,403.14
1,421.04
1,437.42
1,454.15
1,469.87
1,484.26
1,528.50
1,544.08
1,557.98
1,572.47
1,587.38
1,602.06
1,616.12
1,646.34
1,861.14
1,677.45
1,693.78
1,709.67
1,729.27
1,745.39
1,762.54
7/11/2017 10:26:45AM Page 10 COMPASS 5000.1 Build 81D
Azi (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Basting
OL09
(°)
(usft)
Wait)
(usR)
(usft)
Wait)
)usR)
(°f100usft)
89.25
226.47
8,661.64
8,575.77
2,370.53
-896.88
5,972,889.871
641,679.298
1.03
85.78
226.63
8,665.73
8,579.86
2,305.75
-965.26
5,972,823.807
641,612.162
3.68
84.30
226.72
8,668.71
8,582.84
2,282.13
-990.30
5,972,799.720
641,587.578
4.29
85.47
226.10
8,671.63
8,585.76
2,259.66
-1,013.90
5,972,776.807
641,564.407
4.04
86.15
225.88
8,673.66
8,587.79
2,240.43
-1,033.82
5,972,757.198
641,544.866
2.57
86.08
224.55
8,680.02
8,594.15
2,174.42
-1,100.31
5,972,689.950
641,479.639
1.41
87.35
222.99
8,681.94
8,596.07
2,150.29
-1,123.44
5,972,685.381
641,456.983
6.00
87.53
221.36
8,683.35
8,597.48
2,126.83
-1,144.69
5,972,641.522
641,436.180
5.17
87.47
219.31
8,684.68
8,598.81
2,103.65
-1,164.37
5,972,617.974
641,416.943
6.73
89.34
218.44
8,685.58
8,599.71
2,078.45
-1,184.69
5,972,592.397
641,397.114
6.37
90.23
216.49
8,685.70
8,599.83
2,053.27
-1,203.98
5,972,566.861
641,378.304
6.76
90.23
215.86
8,685.58
8,599.71
2,028.88
-1,221.82
5,972,542.137
641,360.931
2.02
90.26
215.40
8,685.18
8,599.31
1,952.02
-1,276.93
5,972,464.246
641,307.296
0.51
90.63
215.26
8,684.92
8,599.05
1,924.56
-1,296.40
5,972,436.423
641,288.358
1.18
91.52
215.60
8,684.35
8,598.48
1,900.18
-1,313.74
5,972,411.717
641,271.479
3.18
93.06
215.05
8,683.10
8,597.23
1,874.65
-1,331.83
5,972,385.855
641,253.880
5.22
95.06
215.37
8,680.81
8,594.94
1,848.23
-1,350.48
5,972,359.087
641,235.742
6.25
95.06
215.61
8,678.02
8,592.15
1,822.55
-1,368.79
5,972,333.068
641,217.926
0.76
95.09
215.52
8,675.34
8,589.47
1,798.04
-1,386.32
5,972,308.222
641,200.865
0.31
95.15
216.52
8,669.62
8,583.75
1,746.43
-1,423.84
5,972,255.917
641,164.335
1.56
94.71
217.28
8,667.00
8,581.13
1,722.14
-1,442.08
5,972,231.285
641,146.563
2.87
93.97
218.31
8,664.53
8,578.66
1,696.40
-1,462.04
5,972,205.171
641,127.093
3.87
93.33
219.31
8,662.51
8,576.64
1,671.72
-1,481.89
5,972,180.126
641,107.722
3.74
93.15
220.40
8,660.82
8,574.95
1,648.78
-1,501.04
5,972,156.821
641,089.007
3.68
93.15
221.10
8,658.84
8,572.97
1,621.51
-1,524.54
5,972,129.112
641,066.035
1.94
92.56
222.50
8,657.40
8,571.53
1,600.05
-1,543.72
5,972,107.296
641,047.262
5.27
92.19
223.16
8,656.16
8,570.29
1,578.16
-1,564.01
5,972,085.029
641,027.395
2.53
V. Sec
)usR)
1,208.35
1,267.38
1,289.00
1,309.36
1,326.50
1,383.49
1,403.14
1,421.04
1,437.42
1,454.15
1,469.87
1,484.26
1,528.50
1,544.08
1,557.98
1,572.47
1,587.38
1,602.06
1,616.12
1,646.34
1,861.14
1,677.45
1,693.78
1,709.67
1,729.27
1,745.39
1,762.54
7/11/2017 10:26:45AM Page 10 COMPASS 5000.1 Build 81D
BP
Final Survey Report
BAKER
gUGHES
cF,pa,y
Company:
North America -ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project:
Prudhoe Bay
ENV
Northing
Easeng
DLeg
ND Reference:
J -28A Actual @ 85.87usft (Parker 272 Actual)
Site:
PB J Pad
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
Well:
J-28
North Reference:
True
Wellbore'
J -28A
Survey Calculation Method:
Minimum Curvature
Design:
J -28A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
5,972,060.361
641,004.746
3.39
MD
Inc
Azi (azimuth)
TVD
rvDSS
NIS
ENV
Northing
Easeng
DLeg
V. Sac
(usft)
(°)
(^)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100us1)
(usft)
13,791.76
91.60
224.13
8,655.05
8,569.18
1,553.93
-1,587.13
5,972,060.361
641,004.746
3.39
1,782.18
13,823.38
90.14
225.67
8,654.57
8,568.70
1,531.53
-1,609.44
5,972,037.548
640,982.862
6.71
1,80127
13,852.00
89.20
227.53
8,654.74
8,568.87
1,511.87
-1,630.24
5,972,017.495
640,962.448
7.28
1,819.22
13,886.37
89.25
229.34
8,655.20
8,569.33
1,489.07
-1,655.95
5,971,994.212
640,937.175
5.27
1,841.63
13,918.26
89.13
230.42
8,655.66
8,569.79
1,468.52
-1,680.33
5,971,973.207
640,913.189
3.41
1,863.02
13,946.87
89.16
232.03
8,656.08
6,570.21
1,450.73
-1,702.48
5,971,955.001
640,691.387
5.67
1,882.56
13,981.45
90.32
233.80
8,858.24
8,570.37
1,429.76
-1,730.22
5,971,933.508
640,864.049
6.08
1,907.22
14,012.78
90.26
235.62
8,656.08
6,570.21
1,411.66
-1,755.79
5,971,914.928
640,838.828
5.81
1,930.12
14,041.12
90.26
237.53
8,655.95
8,570.08
1,396.05
-1,779.44
5,971,896.872
640,815.480
6.74
1,951.45
14,075.76
91.61
239.76
8,655.38
8,569.51
1,378.03
-1,809.02
5,971,880.294
640,786.255
7.52
1,978.32
14,107.77
93.18
241.94
8,654.05
8,568.18
1,362.46
-1,836.95
5,971,804.190
640,758.630
8.39
2,003.90
14,135.72
94.20
242.84
8,652.25
8,566.38
1,349.53
-1,861.66
5,971,850.797
640,734.167
4.86
2,026.64
14,169.53
94.16
244.27
8,649.78
8,563.91
1,334.51
-1,891.85
5,971,835.211
640,704.269
4.22
2,054.53
14,201.55
94.19
245.09
8,647.45
8,561.58
1,320.86
-1,920.72
5,971,821.008
640,675.669
2.56
2,081.29
14,230.73
93.79
245.33
8,645.42
8,559.55
1,308.65
-1,947.15
5,971,808.303
640,649.481
1.60
2,105.83
14,264.47
92.95
246.25
8,643.44
8,557.57
1,294.84
-1,977.87
5,971,793.911
640,619.033
3.69
2,134.41
14,295.28
92.23
247.70
8,642.05
8,556.18
1,282.80
-2,006.19
5,971,781.338
640,590.943
5.25
2,160.85
14,325.48
92.07
248.95
8,640.91
8,555.04
1,271.65
-2,034.24
5,971,769.662
640,563.118
4.17
2,187.14
14,358.35
92.07
249.49
8,639.73
8,553.86
1,260.00
-2,064.95
5,971,757.427
640,532.636
1.64
2,216.00
14,419.95
92.07
251.09
8,637.50
8,551.63
1,239.24
-2,122.90
5,971,735.570
640,475.094
2.60
2,270.62
14,514.22
90.99
255.24
8,634.98
8,549.11
1,211.95
-2,213.08
5,971,706.578
640,385.459
4.55
2,356.29
14,546.76
90.06
256.98
8,634.68
8,548.81
1,204.14
-2,244.66
5,971,698.169
640,354.030
6.06
2,386.54
14,578.37
90.11
258.43
8,634.64
8,548.77
1,197.41
-2,275.54
5,971,690.852
640,323.282
4.59
2,416.23
14,608.10
90.08
259.42
8,634.59
8,548.72
1,191.70
-2,304.72
5,971,684.588
640,294.222
3.33
2,444.37
14,641.35
90.08
260.19
8,634.54
8,548.67
1,185.82
-2,337.45
5,971,678.083
640,261.618
2.32
2,476.00
14,673.15
90.08
261.78
8,834.50
8,548.63
1,180.83
-2,368.85
5,971,672.504
640,230.314
5.00
2,506.45
14,703.75
90.14
263.43
8,634.44
8,546.57
1,176.90
-2,399.20
5,971,667.990
640,200.053
5.40
2,535.99
711112017 10:2&454M page 11 COMPASS 5000.1 Build 81D
bp
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
SRO:
PB J Pad
Well:
J-28
Wellbore:
J -28A
Design:
J-2aA
Survey
MD
Inc
(usft)
(°)
14,736.30
90.08
14,766.95
90.08
14,797.78
90.08
14,892.14
91.15
14,986.04
91.15
15,080.22
92.29
15,174.09
92.23
15,268.95
92.20
15,305.05
92.29
15,334.83
92.23
15,363.76
92.26
15,397.16
92.29
15,428.32
92.29
15,457.59
92.26
15,490.92
92.26
15,552.86
92.01
15,586.11
91.17
15,617.15
90.81
15,647.03
90.31
15,706.98
90.08
15,750.00
90.08
Projection to TD
- 4 117'
BP
Final Survey Report BAKER
1 acE HES
Local Co-ordinate Reference:
Well J-28
TVD Reference:
J -28A Actual @ 85.87usft (Parker 272 Actual)
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K- Alaska PROD - ANCP1
Azi (azimuth)
TVD
TVDSS
NIS
ENO
Northing
Easbng
DL99
V. Sac
P)
(usft)
(usft)
(usft)
(usft)
(uaft)
(usft)
(°1100usft)
(usft)
264.76
8,634.38
8,548.51
1,173.55
-2,431.57
5,971,854.027
640,167.748
4.09
2,567.62
266.50
8,634.33
8,548.46
1,171.21
-2,462.13
5,971,661.112
640,137.241
5.68
2,597.58
266.75
8,634.29
8,548.42
1,169.40
-2,492.91
5,971,658.712
640,106.507
0.81
2,627.83
267.03
8,633.28
8,547.41
1,164.28
-2,587.12
5,971,651.804
640,012.414
1.17
2,720.50
267.36
8,631.39
8,545.52
1,159.68
-2,680.89
5,971,645.428
639,918.757
0.35
2,812.79
267.73
8,628.57
8,542.70
1,155.65
-2,774.94
5,971,639.609
639,824.808
1.27
2,905.43
267.75
8,624.86
8,538.99
1,151.95
-2,868.66
5,971,634.130
639,731.179
0.07
2,997.80
267.07
8,621.20
8,535.33
1,147.67
-2,963.36
5,971,628.048
639,636.593
0.72
3,091.05
265.40
8,619.78
8,533.91
1,145.30
-2,999.35
5,971,624.996
639,600.654
4.63
3,126.40
264.03
8,618.61
8,532.74
1,142.56
-3,028.98
5,971,621.693
639,571.084
4.60
3,155.39
262.57
8,617.48
8,531.81
1,139.19
-3,057.69
5,971,617.775
639,542.446
5.04
3,183.38
260.91
8,616.15
8,530.28
1,134.39
-3,090.72
5,971,612.354
539,509.519
4.97
3,215.46
259.62
8,614.90
8,529.03
1,129.13
-3,121.40
5,971,606.508
639,478.941
4.14
3,245.15
258.98
8,613.74
8,527.87
1,123.70
-3,150.14
5,971,600.533
639,450.314
2.19
3,272.90
257.83
8,612.43
8,526.56
1,117.00
-3,182.76
5,971,593.221
639,417.825
3.45
3,304.32
255.81
8,610.12
6,524.25
1,102.89
-3,243.03
5,971,577.966
639,357.846
3.28
3,362.13
254.35
8,609.20
8,523.33
1,094.33
-3,275.14
5,971,568.801
639,325.901
5.06
3,392.80
253.15
8,608.66
6,522.79
1,085.65
-3,304.94
5,971,559.552
639,296.279
4.04
3,421.15
253.17
8,608.37
8,522.50
1,076.99
-3,333.53
5,971,550.355
639,267.854
1.67
3,448.32
252.43
8,608.17
8,522.30
1,059.27
-3,390.80
5,971,531.544
639,210.937
1.29
3,502.67
252.43 8,608.11 8,522.24 1,046.28 -3,431.82 5,971,517.781 639,170.182 0.00 3,541.56
7/112017 1O:26.45AM Page 12 COMPASS 50001 Build 81D
1
Design Annotations
Measured
Depth
(usR)
11,283.21
15,750.00
BP
Final Survey Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Casing
Hole
by
Diameter
Company: North America - ALASKA - BP
Project Prudhoe Bay
4.500
Site: PB J Pad
Well: J-28
Wellbore: J -28A
Design: J -28A
Casing Points
Measured
Vertical
Depth
Depth
(usR)
(usft) Name
15,750.00
8,608.11 41/2'
Design Annotations
Measured
Depth
(usR)
11,283.21
15,750.00
BP
Final Survey Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Casing
Hole
Diameter
Diameter
(in)
(in)
4.500
6.125
BAKER
JUGHES
E—,-,
Well J-28
J-211AActual @ 85.87usft (Packer 272 Actual)
J -28A Actual Q 85.87usft (Parker 272 Actual)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Vertical Local Coordinates
Depth .N/ -S •E/ -W
(usft) (usft) (usft) Comment
8,845.34 3,206.24 228.05 TIP to J-28APB1
8,608.11 1,046.26 -3,431.82 Projection to TO
Prepared By: Yosha Raghirsingh Survey Manager Baker Hughes a GE Company
7/112017 10:26:454M Page 13 COMPASS 5000 1 Build 81D
Z by
Project:
Site:
Well: J-28
Wellbore: J -28A
,�, •
o
REFERENCE INFOR
J -05/J -05B-----
J -28A
wat.I.R.TrveRwm
ar T
CoVetcN
VMrall D)Re... 12BF Mw1�05.B1wfl (PAXer Z12 MNM7
VS)Relaema
Secy (VS) FeMam. 6Xd(BOON,000E)
Meaeureo repo gelersw: JRBB NXaIQBS.B1wX(Paler2M RduM)
c31cuWm WT 1ITom C wmem
POST DRILLING
V to m J O O m S m A P A A A A A
N w p mp
O O O O O O O O O O O O O O O O p O O O
5976000', J -07/J-0
J-O6/J-O6
li 5975700 9000
5975400
5975100
5974800 J -28/J-280 9p00 J -22/J-22
5974500 900 -22/J- 2A
J-291,1-29 Qoj
5974200
J -29/J-29 J-28/J-28PB1
5973900
0
`973600- 00 9 �
973300 J-0031JJ-03
&973000
972700 J -26/J-26 0 g000 90 0
000 9000 00
X59724001 ro0 Oo
O
972100 000 1.28/,1-28APB1 0t
`� J-11 /J-11AP81 000
0
5971800 000
5971500 J -28/J -28A 00 000 00
o h� J- 1/J
J -11/J-11
5971200
J-11/JA1 co o o a 0 00
5970900- o o
v1v a
5970600
5970300
70
5970000 J-271,1-27 J-14/1 14
5969700
J-27/1 27A J -14/J-14
-
BA. �(ER
UGHES
cEr��wey
(A1 (Ail A A A w N UI N OI N
to a V V w 0
O O w w N w w A J O N
o J 0/J07 0 0 0 0 0 0 0 0 0 o
0 0 0 0 0 0
900 - 5976000
0
5975700
'5975400
8000 15975100
J -25/J -25A
J -05/J -05C i
w w 5969700
m m- m.. m.—.
A A p A N A A A A A A A A A A
m �p w m N Ll N
O O O O O O O O O O O O G O O O O O O O O O O O O O O O
O O G O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
ADGM Repol-
-
o
J -05/J -05B-----
rSOU
A
5974500
Op
-
5974200
Y
70 6000
190
5973900
5973604
8000
J-05/J-05CL
o O
59733001
O 00
''qJ
-05/J-05
59730�WD
6000
7000
J-05/J-05APB1 J -05/J -05A
o
5972700
Q �0
C
i0
app 00
[5972400
p
-600
5972100-
1O
�O0
5000
pOp 1O
5971800 --
J-25/J-
J-251,1-25
5971500
5971200
4000
5970900
oo
J
-161,1-16B
J -17/J -17A
J-011,1-01 B
o
J -17/J -17D 1.5970600
J -01/J -WB oo
o
J -18/1-18A
J-18/1-18
J -17/J -17C
5970300
1511 -15/1 15A
o
00
1 27
0
000
0
5970000
-
J -16/J 16
J-171,1-
w w 5969700
m m- m.. m.—.
A A p A N A A A A A A A A A A
m �p w m N Ll N
O O O O O O O O O O O O G O O O O O O O O O O O O O O O
O O G O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
ADGM Repol-
-
by
North America - ALASKA - BP
Prudhoe Bay
PB J Pad
J-28
J -28A
J -28A
AOGCC Post Drilling Offset Report
10 July, 2017
B<ER
HAUGHES
a GE company
/�OOGCC Report
by
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB J Pad
Site Error:
0.00usft
Reference Well:
J-28
Well Error:
O.00usft
Reference Wellbore
J -28A
Reference Design:
J -28A
BP BAKER ICER
Anticollision Report UGHES
cr�omoa�v
Local Coordinate Reference:
Well J-28
TVD Reference:
J -28A Actual @ 85.87usft (Parker 272 Actual)
MD Reference:
J-28AActual @ 85.87usft (Parker 272 Actual)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Output errors are at
1.00 sigma
Database:
EDM RSK - Alaska PROD - ANCP1
Offset TVD Reference:
Offset Datum
Reference
J -28A
BOSS -GYRO
Filter type:
NO GLOBAL FILTER: Using user defined selection 8 filtering criteria
WARNING: There is hidden fight date in this project
Interpolation Method:
MD Irderval 25.00usft Error Model:
ISCWSA
Depth Range:
11,283.21 to 15,750.00usft Scan Method:
Tram. Cylinder North
Results Limited by:
Maximum center -center, distance of 2,160.92usft Error Surface:
Elliptical Conic
Survey Program Date 7/10/2017
From To
(-It) (usR) Survey (Wellbore) Tool Name Description
108.76
2,908.76 J-28 Srvy 1 BOSS -MS (J-26PB1)
BOSS -GYRO
Sperry -Sun BOSS gym muftishot
2,953.00
3,706.00 Gyrodata SS 8-1/2" (J-28APB1)
GYD-GC-SS
Gylodata gyro single shots
3,801.81
10,630.03 BHI ATK MWD 8-1/2'X9-7/9'(J-28APB7)
MWD+IFR+MS-WOCA
MWD + IFR + Mufti Station W/O Crustal
10,683.54
11,283.21 BHI OTK MWD 6-118"(J-28APB1)
MWD+IFR+MS-WOCA
MWD + IFR + Mufti Station W/O Crustal
11,302.76
15,706.88 BHI OTK MWD 6 -1/8"(J -28A)
MWD+IFR+MSWOCA
MWD+IFR +Multi Station W/O Crustal
71702077 5: 18:55PM/L✓ 0 G7 ape 2pf f-14-filt PO (r l- COMPASS 5000.1 Build BlD
BP
pAnticollision Report BAF�UGHES
Ec mpany
Company:
North America -ALASKA - BP
Local Coordinate Reference:
Well J-28
Project:
Prudhoe Bay
TVD Reference:
J-28AActual@ 85.87usft(Parker 272 Actual)
Reference Site:
PB J Pad
MD Reference:
J -28A Actual a 85.87usft (Parker 272 Actual)
Site Error:
0.00usft
North Reference:
True
Reference Well:
J-28
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
J -28A
Database:
EDM R5K-Alaska PROD -ANCP7
Reference Design:
J -28A
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Welltlom Design
(usft)
(usft)
(usft)
(usft)
PB J Pad
J-01 - J-01 - J-01
Out of range
J -01 -J -01A -J -01A
13.39696
9,900.00
1,661.20
98.77
1,563.83
Pass - Major Risk
J-01 - J-01 B - J-01 B
Out of range
J-01 - J-01 B - Plan #7
Out of range
J-03 - J-03 - J-03
13,215.61
9,375.00
717.64
175.21
550.40
Pass -Major Risk
J-05 - J-05 - J-05
Out of range
J-05 - J -05A - J -05A
Out of range
J-05 - J-05APB1 - J-05APB1
Out of range
J-05 - J-058 - J -05B
Out of range
J-05 - J -05C - J -05C
Out of range
J-05 - J-05CL1 - J-05CL7
Out of range
J -06 -J -06-J-06
11,908.21
9,425.00
1,459.81
251.99
1,311.53
Pass -Major Risk
J-07 - J-07 - J-07
Out of range
J-07 - J -07A- J -07A
Out of range
J -11 -J -11-J-11
15,739.77
9,450.00
975.39
661.05
416.46
Pass -Major Risk
J -11 -J -11A -J -11A
15,587.44
10,300.00
110.52
617.22
-505.13
FAIL - Major Risk
J-11-J-11APB1-J-11APB1
15,587.44
10,300.00
110.52
617.22
-505.13
FAIL -Major Risk
J-14 - J-14 - JA4
Out of range
J-14 - J -14A- JA4A
Out of range
J-15 - J-15 - J-15
Out of range
J-15 - J -15A- J-1 5A
Out of range
J-15 - J-1 5B - J -15B
Out of range
J-16 - J-16 - J-16
Out of range
J-16 - J -18A- J-1 6A
Out of range
J-16 - J -16B - J-168
Out of range
J-18 - J-168PB1 - J -168P81
Out of range
J-17 - J-17 - J-17
Out of range
J-17 - J -17A- J -17A
Out of range
J-17 - J-1 7B - J-178
Out of range
J-17 - J-178PB1- J-178PB7
Out of range
J-17 - J-1 7C - J-1 7C
Out of range
J-17 - J-1 7D - J-1 7D
Out of range
J-18 - J-18 - J-18
Out of range
J-18 - J -18A- J-1 SA
Out of range
J-22 - J-22 - J-22
11,796.23
9,400.00
515.88
118.60
401.93
Pass - Major Risk
J-22 - J -22A - J -22A
11,796.23
9,400.00
515.88
118.60
401.93
Pass - Major Risk
J-25 - J-25 - J-25
Out of range
J-25 - J -25A- J -25A
Out of range
J-25 - J -25A -Plan 1/6
Out of range
J -26 -J -26-J-26
15,749.28
9,375.00
698.58
169.06
540.22
Pass - Major Risk
J-27 - J-27 - J-27
Out of range
J-27 - J -27A- J -27A
Out of range
J-27 - J -27B - J -27B
Out of
J -28 -J -28-J-28
13,158.21
9,075.00
1,800.80
182.38
1,837.48
Passs-.Major Risk
J-28-J-28APB1-J-28APB1
13,307.76
13,300.00
0.46
33.52
-32.96
FAIL - Major Risk
J-28-J-28PB7-J-28PB7
13,133.21
9,175.00
1,802.89
172.71
1,641.23
Pass -Major Risk
J -29 -J -29-J-29
15,591.28
10,050.00
567.00
152.86
420.48
Pass - Major Risk
J-29 - J-29 - Plan #9d J-29 approved
15,583.21
10,075.00
564.81
158.51
412.32
Pass - Major Risk
J-30 - J-30 - J-30
Out of range
7/70/2017 5:18'55PMAO G o/ �� P O I ('j j COMPASS 5000.1 Build 81D
Printed 8/8/2017 11:20:46AM
North America - ALASKA - BP
Page 1 of 2
Cementing Report
Comrtan Well Name: J-28 / 02
.a _ —--- --- -----
--- —
Project Prutlhce Bey
Site: PB J Ped --
Rspodo.: n 1 Report date: 6/28/2017
--
Event Type: RE -ENTER -ONSHORE (RON)
_ _
SPud DeteRane: 5/17/1987
Start Date: 6/16/2017 End Gate: 7/8/2017
AFE No.:
Contractor PARKER DRILLING CO.
Rig Namei PARKER 272 Rig Release: 7/15/2017 X3 -0184N -C: (8,648,145.00 )
BPUOI: USA00000397
Active datum: JQeAActual @85.87usft (above Mean Sea LeveO
General Information
Job type: Primary
Cement job start date/time. 6/28/2017 9 30P
Job end date/time: 6/28/2017 11:30PM
Cement Company: SCHLUMBERGER
Cementer: DYLAN WAUGH
Cemented String: TIEBACK LINER 1
String Size: 7.000 (in)
String Set TMD'. 10,669.00 (usft) Hole Size: 9.875( in)
Pipe Movement
Pipe Movement. NO MOVEMENT
Rotating Time (Start -End):
RPM.
Rotating Torque(init/avg/max)'. (ft-ibf)
Reciprocating Time (Start -End):
Recip Drag Up/Down. - (kip)
SPM:
Stroke Length'.
Fluid Name: SPACER
Fluids (1 of 2)
Slurry Type: SPACER
Purpose: SPACER
Class:
Description:
MUD PUSH II Density: 12.00 (ppg)
Yield:
Mix Water Ratio:
Excess:
Mix Method: BATCH
Sacks Used:
Water Volume:
Excess Slurry Volume:
0.0 (1 Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well:
Slurry Volume:
35.0 (bbl) Excess Measured From: EST. GAUGE HOLE
Mud Type:
Density:
10.30 (ppg) PV: 10.00 (cp)
YP: 17.000 (Ibf/t00fP) Viscosity: - 45.00 (s/qt)
Gels 10 Sec: 6.000 (Ibf/1 WWI
Gels 10 Min:
9.000 (lbf/100ft')
Fluid Name: CEMENT
Fluids (2 of 2)
Slurry Type', CEMENT
Purpose: SPACER
Class:
G -CLASS Description:
TAIL SLURRY Density: 15.80 (ppg)
Yield: 1.1700 (fP/sk)
Mix Water Ratio:
5.212 (gaVsk94) Excess:
40.00(%) Mix Method: BATCH
Sacks Used: 403.00 (941b sacks)
Water Volume:
50.0 (bbl) Excess Slurry Volume:
24.0 (bbl) Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well :
Slurry Volume:
84.0 (bbl) Excess Measured From: EST. GAUGE HOLE
Mud Type:
Density:
10.30 (ppg) PV: 10.00 (cp)
YP: 17,000 (0100R') Viscosity: 45.00 (s/qt)
Gels 10 Sec: 6.000 (Ibf/109f 2)
Gels 10 Min:
9.000 (lon o0w)
Additives
Name
Type
Amount
Units
Concentration Unit
D047
ANTIFOAM AGENT
D085
DISPERSANT
0.200
GAUBBL
D600 G
GAS -BLOCK
0.600
% BWOC
D187
FLUID LOSS
2.000
GAUSX
D177
RETARDER
0.100
% BMOC
0.030
GAUSX
Printed 8/8/2017 11:20:46AM
Printed 8/8/2017 11:20:46AM
North Armadog - ALASKA - BP
Page s of 2
Cementing Report
—
ommon Well Name J 28 / 02
-- — —
—
-
- — ----
Report no.:—1 Report date: 8/28/2017
Project: Prudhoe Bay
Site: PS J Pad
tl Date/Time: 5/17/1987
Event Type: RE-ENTER-ONSHORE (RON)
- _
Start Date: 6/16/2017
-- -_-- _- _– ---
End Date: 7/8/2017
No :Contractor:
tAt
PARKER DRILLING CO.
Rig Name/No.: PARKER 272 Rig Release: 7/15/2017
3-01B4N-C: (8,648,145.00 )
BPUOL USA00000397
Active datum'. J-28AActual @85.8760(above Mean Sea Level)
_
_--
PIPId Tots
Thick time Thick
Free water
Free water Fluid loss Fluid loss
Fluid loss Comp Comp Comp
Comp Comp StrengthComp
Strength
(hr) temp.
M
temp.
(cc/30min) temp.
press. Strength Strength Strength
Strength Time Pressure 2
Temperature 2
('F)
(`F)
(°F)
(psi) Time 1 Pressure 1 Temperature
1
2 (psi)
(°F)
min) (psi"F
min
5.13
0.00
80.00 18.0 150.00
1,000.00
stages
Stage
Stage Type
Est. Top
Est. Bottom
Mud Circ. Mud Circ.
Top
Bottom
Ptu9
Pressure
Float
Pressure
Returns
Circulate
Cmt Vol to
Total
Annular
no.
(usft)
(usk)
Rate Press.
Plug
Plug
9umpe,
lump.,
Hem
Hem
Prior
Surface
Mud Lost
Flow
(gpm) (psi)
(psi)
(bbl)
Aker
I
PRIMARY CEMENT
8,872.00
10,669.00
Y
y
Y
Pumping sehsduls
Fluid pumped
Volume
Avg.
Max Disp. Slurry Top Slurry Base
Start Mix Cmt
Start Slurry Pumping end
Start Disp Foam
Gas Type
Gas Vol
BH circ. Bh static
Pumped
Disp.
Rate TMD TMD
Pmp date/time
job
Used
temp. temp.
(bbl)
I Rate
(bbpmin) (usft) (usft)
(scf)
bbl/min!
Tota
Casing Test
Shoe Test
Liner Top Test
Test Pressure: 3,500.00 (psi)
FIT/LOT: (ppg)
Liner Overlap. (usft)
Time: 30 (min)
Tool: N
Positive Test: (ppg)
Positive Test Tool: N
Cement Found between Shoe and Collar:
N
Open Hole Length: (usft)
Negative Test: (ppg)
Negative Test Tool: N
Hours Before Start: (hr)
Time before test (hr)
Curt Found on Tool: N
Log/Survey Evaluation
Interpretation Summary
CBL Run: N
Cement Top: 8,872.00 (usft)
Under Pressure: (psi)
How Determined: CALCULATED
Bond Quality:
TOC Sufficient: Y
CET Run: N
Job Rating:
Bond Quality:
If Unsuccessful, Detection Indicator:
Temp Survey: N
Remedial Cement Required: N
Pre Prior to Log: (hr)
How Determined:
Printed 8/8/2017 11:20:46AM
Printed 8/8/2017 11:21:19AM
North America - ALASKA - BP
Page i of 2
Cementing Report
Common Well Name, J-28 / 03
-
Project: Prutlhoe Bey
_ _
Site: PBJ Pad
0/2017-—�
Report no.: 2 Report date: 7/1
Event Type: COM -ONSHORE (CON)
Spud Date(Time:-5/17/1987
Start Date: 7/9/2017 End Date: 7/15/2017
WE No.: - - —
Contractor: PARKER DRILLING CO.
Rig Name/No.: PARKER 272 Rig Release: 7/15/2017 X3.0184N-C: (2,059,304.00)
BPUOI: USA00000397
Active datum: J-28AActual 985.87usd (above Mean Sea Level)
-
General Information
Job hype: Primary
Cement job start date/time'. 7/10/2017 2:30PM
Job end date/time: 7/10/2017 5:OOPM
Cement Company: SCHLUMBERGER
Cementer: RICK GRANT
Cemented String: PRODUCTION LINER 1
String Size: 4.500 (in)
String Set TMD'. 15,748.00 (usft) Hole Size: 6.125 (in)
j'
Pipe Movement
Pipe Movement RECIPROCATING
Rotating Time (Start -End):
RPM:
Rotating Torque (init/avg/max)'. (ft-Ibf)
Reciprocating Time (Start -End)'. 12.00:00 pm - 4:35:00 pm
Recip Drag Up/Down: - (kip)
SPM: Stroke Length: 70.00 lush)
Fluid Nemo: SPACER
Faulds (1 of 2)
Slurry Type. SPACER
Purpose'. SPACER
Class:
SPACER Description:
SPACER WEIGHTED Density: 12.00 (ppg)
Yield
Mix Water Ratio:
Excess:
Mix Method: BATCH
Sacks Used:
Water Volume:
Excess Slurry Volume:
0.0 (bbl) Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well:
Slurry Volume:
30.0 (bbl) Excess Measured From:
Mud Type:
Density:
8.50 (ppg) PV'. 0.00 (cp)
YP: 0.000 (Ibf/100ft-) Viscosity: 0.00 elilt)
Gels 10 Sec: 0.000 (Ihf/1001')
Gels 10 Min:
0.000 (Ihf/100ft')
Fluid Name: CEMENT
Fluids (2 of 2)
Slurry Type: CEMENT
Purpose: PRIMARY
Class:
G -CLASS Description:
LEAD SLURRY Density. 15.80 (ppg)
Yield: 1.1700 (%'/sk)
Mix Water Ratio:
5.202 (ga0ske4) Excess:
30.00(%) Mix Method. BATCH
Sacks Used: 576.00 (941b sacks)
Water Volume:
71.3 (bbQ Excess Slurry Volume:
28.4 (bbl) Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well:
100.0 (bbl) Slurry Volume:
120.0 (bbl) Excess Measured From: EST. GAUGE HOLE
Mud Type:
Density:
8.50 (ppg) PV: 0.00 (cp)
YP: 0.000 (Ibf1100fN) Viscosity: 0.00 (s/qt)
Gels 10 Sec: 0.000 (Ibf/100W)
Gels 10 Min:
0.000 (Ibf/t00ft-)
Additives
Name
Type
Amount
Units
Concentration Unit
0047
ANTIFOAM AGENT
D065
DISPERSANT
0.200
GAL/SX
D167
FLUID LOSS
1.000
%BWOC
0800 G
GAS -BLOCK
0.100
%BWOC
D800
RETARDERAID
2.000
GAL/SX
0.100
%BWOC
Printed 8/8/2017 11:21:19AM
Printed 8/8/2017 11:21:19AM
North APnerics - ALASKA • BP
Page 2 of 2
Cementing Report
Common Well Name: J-28 / 03Report
no.:
no.: 2 Repon date: 7/10/2017 -
Project: Prudhoe Bay
Site: PB J Pad
Spud 5/17/1987
Event Type. COM ONSHORE (CON)
I Start Date: 7/9/2017
End Date 7/15/2017
AFE No
X3-0184N-C: (2,859,304.00)
Contractor. PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rig Release' 7/15/2017.
BPUOI: USA00000397
Active datum. J-28A Actual @85.87ustt (above Mean Sea Level)
Fluid Testa
Thick time Thick Free water
Free water Fluid loss
Fluid loss Fluid loss Comp
Comp Comp Comp Comp Strength
Comp Strength
(hr) temp. (%)
temp.
(cc/30min)
temp.
press. Strength
Strength Strength Strength Time Pressure 2
Temperature 2
(°F)
(°F)
(°F)
(psi) Time 1
Pressure 1 Temperature 1 2 (psi)
(°F)
min(psi)
°F (min)
5.50 0.00 80.00 22.0
180.00
1,000.00
stages
Stage Stage Type
Est Top Est, Bottom Mud Circ. Mud Circ. Top Bottom Plug Pressure Pmat Pressure Returns Circulate Cmt Vol to
Total Annular
no.
(usft)
I
(usft) Rate Press. Plug
Plug Bumped eemped nem Hem Prior Surface
Mud Lost Flow
(gpm) (psi)
(hq (bbl)
(bbl) After
/psi) (mio)
1
RIMARYCEMENT
10,494.56
15,750.00
Y y
y
Pumping schedule
Fluid pumped
Volume
Avg.
Max Disp.
Slurry Top
Slurry Base
Start Mix Cmt
Start Slurry
Pumping end
Start Disp
Foam
Gas Type
Gas Vol
BH circ.
Bh static
Pumped
Disp.
Rate
TMD
TMD
Pmp
date/time
job
Used
temp.
temp.
(bbl)
Rate
(bbU rim)
(usft)
(usft)
(scf)
bbl/min)
CEMENT -LEAD SLURRY
123.0
N
SPACER- SPACER
30.0
N
WEIGHTED
raa
Casing Test
Shoe Test
Liner Top Test
Test Pressure: 3,500.00 (psi)
FIT/LOT: (Ppg)
Liner Overlap: (usft)
Time: 30 (min)
Tool: N
Positive Test (Ppg) Positive Test Tool: N
Cement Found between Shoe and Collar:
N
Open Hole Length: (usft)
Negative Test: (Ppg) Negative Test Tool: N
Hours Before Start: (hr)
Time before test: (hr)
Cmt Found on Tool: N
Log/Survey Evaluation
Interpretation Summary
CBL Run: N
Cement Top: 10,494.56 (usft)
Under Pressure: (psi)
How Determined: TOP OF LINER
Bond Quality:
TOC Sufficient Y
CET Run: N
Job Resting: GOOD
Bond Quality:
If Unsuccessful, Detection Indicator:
Temp Survey: N
Remedial Cement Required: N
His Prior to Log: (hr)
How Determined:
Printed 8/8/2017 11:21:19AM
P rD 1� / _7
Loepp, Victoria T (DOA)
From:
Thompson, Jacob <Jacob.Thompson@BP.com>
Sent:
Friday, July 07, 2017 10:17 AM
To:
Loepp, Victoria T (DOA)
Cc:
Allen, Kenneth W; Lastufka, Joseph N; Raese, J. Kyle
Subject:
J -28A PTD# 217-075 Changes for Risk Reduction
Attachments:
J -28 -BP Daily Operations -Partners Report -Report Number10-(06-25-2017).pdf; BP J -28A
Wellpath Geographic Reporuls
Follow Up Flag: Follow up
Flag Status: Flagged
Victoria,
I'm covering for Kyle Raese while he is out of town on vacation. Upon reviewing the approved PTD it was noted that a
few changes were made to the as drilled J -28A well from the permit. The PTD was submitted with a directional plan
WP07. The intermediate hole section was planned to kick off out of the 9-5/8" 47# casing and drill an 8-1/2" hole to TD
at the TSGR. WP07 was quite tortious, and the torque and drag modeling indicated that at the 8-1/2" intermediate TD
the pick up weight of the drill string would be approaching the drill pipe tensile limitations with low open hole friction
factor. This indicated that there was a small margin of overpull, and if any hole problems or instability was encountered
the string could easily become stuck.
To reduce the risk of becoming stuck it was decided to Underream the hole section from 3,800' MD to TD to
allow more annular clearance. In addition to this, the intermediate hole trajectory was modified slightly to reduce
tortuosity. The directional path that was drilled had the same window exit depth / X -Y location, as well as the same
intermediate casing point and production hole trajectory in relation to the approved PTD. The as drilled well path did
not vary from any of the approved points in the PTD in relation to objective formations. The planned top of cement was
not changed either however the volume of cement had to be increased to meet the TOC requirements with the
increased hole diameter. The planned cement top in the PTD was 1,300' above the intermediate casing shoe using 44.2
bbls/248 cuft/212 sks of cement to achieve this objective with the 8-1/2" hole. The as drilled well with the 9-7/8" hole
required a 84 bbis/471.6 cuft/403sks of cement to achieve the TOC 1,300' MD above the 7" casing shoe..
I've attached the drilling report for the day the 7" liner was cemented, as well as the the as drilled survey. I appologise
for informing you of these changes after the fact. We will endevor to inform the AOGCC of these changes prior to
execution of the well in the future.
Feel free to call me on my cell phone if you have any questions as I am out of the office today.
Thank you and have a wonderful weekend.
Jacob Thompson
BP Alaska
Rotary Drilling Engineer
Cell.• (907) 854-4377
Dice: (907) 564-5579
North America - ALASKA - BP
Page 1 of 7
Daily Operations Report - Partners (RE -ENTER -
ONSHORE)
Operator: SP EXPLORATION Event Type: RE-ENTER- ONSHORE Report:
10
Well/Wellbore No.: J-28/02 Event Objective: DRILLSIDETRACKA Date:
25/06/2017
WB Objective: OIL WELL PRODUCER W sll Type: DEVELOPMENT
Site: PS J Pad Job Number: 2
Contractor: PARKER DRILLING CO. Rig: PARKER 272
Current Well Status
Depth MD: 9,622.00 (usft) Casing Size: 9.625 (in) Rig Accept:
00:01:0019/06/2017
Est TVD: 6,935.86 just) Casing(MD): 2,953.00 (usft) Rig Release:
Progress: 997.00 (usft) Cost in: US Dollar Spud Date:
17/05/1987
Au81 Depth: 16,662.00 (usft) Next Casing Size: 7.000 (in) Exchange Rate: WX Date:
20/06/2017
Hole Size: 9.875 (in) Next Casing(MD): 10,676.00 (usft) Daily Mud: 29,444.19 Ground Elevation:
39.51 (usft)
Next Casing(rVD): 8,623.00 (usft) Cum. Mud: 233,929 KB Elev:
85.87(usM
Elev Ref: J-28AActual @85.87usft (above Mean Sea Level) Daily Cost: 271,002.19 Total Personnel:
32
Geologist: T. BOUCHER IT. CUNNINGHAM Cum. Event: 2,712,336 Wellbore Max Angle:
58.04
Engineer: K. RAESE DOL: 9.25
Day WSL: R. CADENHEAD/J. HARTLEY DFS: 5.60
Night WSL: A. KNOWLES Est Days: 26.46
Weather: - 45°F, 8 MPH N WIND, 41° F WC
Status at 00:00: DIRECTIONAL DRILLING 8-112"X 9-7/8" INT HOLE AT 9622' MD
24 Hr Summary: DIRECTIONAL DRILL 8-1/2" X 9-7/8" INT HOLE FROM 8625' MD TO 9622' MD (997' IN 24 HRS = 41.5 FPH WITH CONNECTIONS).
24 Hr Forecast: DIRECTIONAL DRILL 81/2" X 9-7/8" INT HOLE TOWARDS PROJECTED HOLE SECTION TD AT 10670' MD (SAG RIVER)
Update at 06:00: DIRECTIONAL DRILLING 8-1/2" X 9-7/8" INT HOLE AT 9933' MD (52 FPH WITH CONNECTIONS SINCE MIDNIGHT)
Comments: NO ONE HURT, NO DROPPED OBJECTS, NO SPILLS
0 10/0 HRS CODE 8 NPT PARKER (DAILY / MONTHLY / ANNUAL). 33.5 HRS TOTAL NPT FOR WELL
HSE and Well Control
Days Since Last DAFWC: 929 All Free Days: 929 (days)
Incident Details: NONE
Safety Moment Topic: CORRECT PPE FOR THE JOB
Keywords:
Comments: WITH DRILLING OPERATIONS CREWSARE DOING SIDE PROJECTS. DISCUSSED THE IMPORTANCE OF USING PROPER PPE FOR TASKS
THAT REQUIRE IT.
Last Csg Test Press: 3,500.00 (psi) Number of Dropped Objects: 0 Last 1-12S Drill:
12/06/2017
Last BOP Pressure Test 19/06/2017 Last Abandonment Drill: 12/06/2017 Last Trip DO (Dl):
10/06/2017
Next BOP Press Test: 03/07/2017 Last Accum Drill (D4): 19/06/2017 Last Safety Meeting:
25/06/2017
Last Diverter Dnll (133): 11/05/2017 Last Spill Drill: 14/06/2017 Last Environmental Incident:
07108/2015
Safety Observation Cards: 30 Regulatory Agency Insp: No Noncompliance Issued:
No
KICK WHILE DRILL (D2) 25/06/2017 WELL KILL (D5) 25/06/2017
Kick Intensity: 1.305 ppg Kick Tolerence: 49.9
LOT TVD: 2,952.36 (usft) BHP: 2,107.69 (psi) Q2,952.36 (usft) MAASSP:
2,107.69 (psi)
LOT EMW 13.74 (ppg) Test Pressure: 620.00 (psi)
No.
Skov Pump Rates (Circ)
Slow Pump Rates (Choke)
Slow Pump Rates (Kill)
Stroke Rate
Pressure (psi)
TMD (usft)
Stroke Rate
Pressure (psi)
F TMD (usft)
Stroke Rate
Pressure (psi)
TMD (usft)
1
40.00
300.00
9,114.00
30.00
380.00
2
40.00
300.00
9,114.00
30.00
390.00
Performance Measures
Safety Observation Cards SOC JSE4 First Aid
Near Mlss/HSE Opp.
Today 30 14
Total ' 186 I I 135
26/06/2017 06:41:54 version: 5000. 1.20170227
North America -ALASKA - BP Page 2 of 7
Daily Operations Report - Partners (RE -ENTER -
ONSHORE)
Operator: BP EXPLORATION Event Type: RE -ENTER -ONSHORE Report: 10
Well/Wellbore No.: J-28/02 Event Objective: DRILL SIDETRACK A Date: 25/06/2017
WB Objective: OIL WELL PRODUCER Well Type: DEVELOPMENT
Site: PB J Pad Job Number: 2
Contractor: PARKER DRILLING CO. Rig: PARKER 272
Operational Parameters
ROP Daily: 51.13 (f /hr) Rotating Weight: 188 (kip) Daily Bit Hrs 19.50 (hr) Pump Status - Drilling
and
Riser
ROP Cum: 89.16 (ft/hr) Pick Up Wt: 257 (kip) Daily Sliding firs 0.00 (hr) No. Operat Efficiency
WOB (min): 8 (kip) Slack Off Wt: 172 (kip) Cum Bit Hrs 65.30 (hr) ion (%)
WOB (max): 13 (kip) Circ Rate Riser: 0.00 (gpm)
Min RPM: 150 (rpm) Circ Rate Hole: 691.52 (gpm) Ann. Vel. Riser: Type
SPMLiner
(spm)
Cric.
size Rate
(in) (gpm)
89.00
5.750 346
RPM DH: 0 (rpm) Ann. Vel. DC1'. 1 D 96.00
Torque on Bottom: 17 (ft-lbf) Circ On Bottom: 3,710 (psi) Ann. Vel. OR 195.00 (ft/min) 2 D 96.00
89.00
5.750 346
Torque off Bottom: 15 (ft-lbf) Jar Him since Inspect: (hr)
Bit Details
Bit Run
Re -Run
Size
Manuf.
Model
Type
Serial #
Nozzles(32nd")
TFA
Depth
Depth
In(usft)
Out(usft)
1
N
8-1/2
1 HYCALOG
I SKI616M-J1D I
PolycrystallineA237437
6X14
0.900
3,800.00
-Z
Diamond Bit
Cum Frog (usft)
RPM Min/Max
WOB Min/Max
Daily Hrs.
Hours Cum ROP Cum
Condition
5,822.00
150/150
8/13 1950.
65.30 1 89.16
BHA
BHA No.: 3 TMD In: 3,800.00 (usft) BHA Weight:
W orkstring Purpose: DRILLING TMD Out. Wt. Below Jars: 26.Okip
Component
Component type
Component Detail
Jts
Length
Cum
OD
ID
Blade OD
Bend
Connection
P/S
Size (in)
Type
usft
Length
in
in
Angle "
(usft)
Bit
Polycrystalline
HYCALOG
1
0.93
0.93
8.500
4.500
REG
P
Diamond Bit
SKI616M-J1D PDC
BIT
Mud Motor
Steerable Motor
AUTOTRAK RSS
1
7.13
8.06
8.030
2.312
4.500
T2
B
MWD
Directional Gamma
NEAR BIT GAMMA
1
3.94
12.00
7.000
2.312
4.500
T2
B
Sub
Stabilizer
FLEX SUB W/ STAB
1
7.98
19.98
7.016
2.312
8.375
4.500
T2
B
MWD
MWD Tool
COPILOT
1
7.05
27.03
7.480
1.744
MWD
MWD Tool
ONTRAK-MWD
1
16.79
43.82
7.000
2.500
4.500
T2
B
Stabilizer
MWD -STAB
1
4.21
48.03
8.375
2.312
8.375
4.500
T2
B
MWD
Powerand
BCPM
1
10.14
58.17
6.937
2.312
4.500
T2
B
Communication Sub
Sub
Non -Mag Gap
NM MWD - SUB -
1
1.54
59.71
7.000
2.312
4.500
IF
B
STOP
Drill Collar
Non Mag Flex Collar
DRILL PIPE -
1
31.19
90.90
5.000
2.812
4.500
IF
B
COMPRESSIVE
Sub
Filter Sub
NM SUB - FILTER
1
7.10
98.00
6.500
3.000
4.500
IF
B
Drill Collar
Non Mag Flex Collar
DRILL PIPE-
1
28.44
126.44
5.000
2.812
4.500
IF
B
COMPRESSIVE
Stabilizer
Non -Mag Integral
NM STRING STAB
1
5.57
132.01
8.375
2.812
8.375
4.500
IF
B
Blade Stabilizer
Drill Collar
Non Mag Flex Collar
DRILL PIPE -
1
30.78
162.79
5.000
2.812
4.500
IF
B
COMPRESSIVE
Stabilizer
Non -Mag Integral
NM STRING STAB
1
5.62
16841
8.375
2.812
8.375
4.500
IF
B
Blade Stabilizer
Undeneamer
Underreamer
8-1/2" X 94/8"
1
13.87
182.28
6.750
2.750
4.500
IF
B
NOV HYDRAULIC
ANDERREAMER
UNDERREAMER.
Sub
Float Sub
NM SUB - FLOAT
1
3.50
185.78
6.750
2.875
4.500
IF
B
WITH PORTED
FLOAT
Drill Collar
Non Mag Flex Collar
DRILLPIPE-
1
31.08
216.86
5.000
2.812
4.500
IF
B
COMPRESSIVE
26/06/2017 06:41:54 Version. 5000.1.20170227
26/06/2017 06:41:54 Version: 5000.1.20170227
North America - ALASKA - BP Page 3 of 7
Daily Operations Report - Partners (RE-ENTER-
ONSHORE)
Operator.
BP EXPLORATION
Event Type: RE-ENTER- ONSHORE Report: 10
WeltiWalbore No.: J-28/02
Event Objective: DRILLSIDETRACKA Date: 25/08/2017
WB Objective:
OIL WELL PRODUCER
Well Type: DEVELOPMENT
Site:
PB J Pad
Job Number. 2
Contractor.
PARKER DRILLING CO.
Rig: PARKER 272
BHA No.: 3
TMD In: 3,800.00 (usft) BHA Weight:
Nbrkstring Purpose: DRILLING
TMD Out: WL Below Jars: 26.0kip
Component
Component type
Component Detail
AS
Length
Cum
OD
ID
Blade OD
Bend
Connection
P/B
Size (in)F-Type
usft
e h
(inl
finIi
An I
(usfl)
Stabilizer
Non-Mag Integral
NM STRING STAB
1
5.65
222.51
8.375
2.812
8.375
4.500 IF
B
Blade Stabilizer
Heavy Weight
Heavy Weight Drill
HWDP X 18
3
92.16
314.67
5.000
3.000
4.500 IF
B
Pipe
Jar
Drilling Jar
JAR-SLB
1
32.36
347.03
6.500
2.250
4.500 IF
B
Heavy Weight
Heavy Weight Drill
HWDP X 8
8
246.18
593.21
5.000
3.000
4,500 IF
B
Pipe
Sub
Cross Over
SUB - X/O
1
3.50
596.71
6.375
2.750
4.000 HT-38
B
Drill Pipe
Drill Pipe
DRILL PIPE 4" X 75
75
2,363.81
2,960.52
4.000
3.340
4.000 HT-38
B
Sub
Cross Over
SUB-X/O
1
3.50
2,964.02
6.375
2.750
4.000 1 HT-38
B
Drilling Fluid
Type:
LSND
10 sec gels: 7.000 (Ibf/100ft-) Ca: ES:
Time:
21:00 /Active Pit #1
10 min gels: 12.000
(Ibf/100fF) K+: Solids: 10.21(%)
Depth:
9,495.98 (usft)
Fluid Loss: 3.8 (cc130min) CaC12: Oil: 2.01)(1/6)
FLTemp.:
130 (°F)
HTHP Temp: 200.00 (°F) NaCL: Water. 87.56 (%)
Density:
10.30 (ppg)
HTHP WL: 9.0 (cr130mm) CI-: 800 (ppm)
Funnel Disc:
46.00 (s/qt)
Cake: 1.0 (32nd") Sand: 0.25(%) Daily Cuttings:
ECD:
10.79 (ppg)
MBT: 18.5
(Ibm/bbl) HGS: 5.07(%) Cum Cuttings: 0.0 (bbli
PV:
13.00 (Cp)
Lime: 0.08 (Ibm/bbl) LGS: 5.14(%) Lost Downholel Cum:
YP:
21.000 (Ibf/100ft°)
PM: 0.40 (cc) POMP: 0.10/0.80 (ccloc) Lost Surface/ Cum:
pH:
9.50
Operations Summary
From-To
Hm
Phase
Task
Activit
Code
NPT
CPath
Operation
Op. Depth (usft)
(hr)
Path
00:00- 06:00
6.00
INTI
DRILL
DRLDIR
P
YES
DIRECTIONAL DRILL 8.1/2"X9-7/8"INT HOLE FROM
8,838.0
8625' MD TO 8838' MO IN CM2 8 CMI FORMATIONS
(213' IN 6 HRS = 36 FPH WITH CONNECTIONS).
- INSTANTANEOUS ROP= 50-80 FPH, LIMITED FOR ECD
- 700 GPM, 3340 PSI ONIOFF BOTTOM, 150 RPM, TRO
ON/OFF BTM =13/10 KFT-LBS, WOB = 5.12 KLBS
• MW IN/OUT = 10.2+ PPG
- ECD CALC CLEANHOLE =10.85 PPG EMW, ACTUAL =
10.80 PPG EMW, HARDLINE = 11.34 PPG EMW
- LOSSES = ZERO
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING INTERVAL
-GAS WATCH: BACKGROUND =150 UNITS, MAX =
200 UNITS
- NO BACKREAMING AT CONNECTIONS. SURVEY
EACH CONNECTIONS
- 8738' MD 35 BBLHIGH VIS SWEEP 20% INCREASE IN
CUTTINGS. -
-CO-PILOT/ UNDERREAMER NOTES: FROM-864T
MD TO -8735' MO OBSERVED HIGH LEVELS OF WHIRL
AT 7 AND STICK SLIP AT 6. STOPPED ROTARY AND PU
OFF BOTTOM TO RELAX THE STRING FOR 30 SEC.
RESUME DRILLING AT REDUCED PARAMETERS: 5KLBS
WOB, 130 RPM WITH REDUCED STICK SLIP, SAME
WHIRL ISSUES. VARY PARAMETERS UNTIL WHIRL
AND AND STICK SLIP WENT AWAY. CONTACT NOV
ANDERREAMER REP TO HELP TROUBLE SHOOT ISSUE,
26/06/2017 06:41:54 Version: 5000.1.20170227
Page 4 of 7
North America - ALASKA - BP
Daily Operations Report - Partners (RE-ENTER-
ONSHORE)
Operator: BP EXPLORATION Event Type: RE-ENTER-ONSHORE Report. 10
WelIM/ellbore No.: J-28/02 Event Objective: DRILLSIDETRACKA Date: 25/06/2017
WB Objective: OIL WELL PRODUCER Well Type: DEVELOPMENT
Site: PB J Pad Job Number: 2
Contractor: PARKER DRILLING CO. Rig: PARKER 272
Operations Summary
Fran-To
Hrs
Phase
Task
Activity
Code
NPT
Critical
Operation
Op. Depth (usft)
(hr)
Path
CO-PILOT DATA INDICATES DOWN HOLE TORQUE
VALUES TO BE NORMAL, INDICATING NO
UNDERREAMER ISSUES.
- POSSIBLY FORMATION RELATEDAS THE WELL
CHANGED FROM THE CM2 TO THE CM1 AT 8577' MD
AND/OR RELATED TO DIRECTIONAL PLAN AS INC = 5°
DURING SIGNIFICANT DROPAND TURN.
06:00 - 12:00
6.00
INTI
DRILL
DRLDIR
P
YES
DIRECTIONAL DRILL 8-1/2" X 9-7/8" INT HOLE FROM
9,065.0
8838' MD TO 9065' MD IN CMI AND HRZ FORMATIONS
(227' IN 6 HRS = 38 FPH WITH CONNECTIONS).
- INSTANTANEOUS ROP= 50 FPH, LIMITED FOR ECD
- 700 GPM, 36003700 PSI ON/OFF BOTTOM, 150 RPM,
TRQ ON/OFF BTM =13-14/11-13 KFT-LBS, WOB = 7-12
KLBS
- MW IN/OUT =10.3 PPG, NO LOSSES
- ECD CALC CLEANHOLE = 10.9 PPG EMW, ACTUAL =
11.4-11.5 PPG EMW, HARDLINE =11.5 PPG EMW
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING INTERVAL
- GAS WATCH: BACKGROUND = 200-300 UNITS, MAX
= 378 UNITS
- NO BACKREAMING AT CONNECTIONS. SURVEY
EACH CONNECTIONS
- 9022' MD 35 BBL LOW VIS / HIGH VIS SWEEP 50%
INCREASE IN CUTTINGS.
- CO-PILOT/ UNDERREAMER NOTES: NO VIBRATIONS
OF NOTE, NO ISSUES DRILLING THROKUGH THE HRZ.
- TOP OF HRZ CAME IN 8943' MO , —50' HIGH TO PLAN.
12:00 - 18:00
6.00
INTI
DRILL
DRLDIR
P
YES
DIRECTIONAL DRILL 8.1/2" X 9-7/8" INT HOLE FROM
9,311.0
9065' MD TO 9311' MD IN HRZ 8 KINGAK FORMATIONS
(246' IN 6 HRS = 41 FPH WITH CONNECTIONS).
- INSTANTANEOUS ROP = 40-70 FPH
- 700 GPM, $700 PSI ON/OFF BOTTOM, 1580 RPM, TRO
ON/OFF BTM = 15/12 KFT-LBS, WOB = 5-13 KLBS
- MW IN/OUT =10.3
- ECD CALC CLEANHOLE = 10.85 PPG EMW, ACTUAL =
11.4 PPG EMW HARDLINE =11.5 PPG EMW
-LOSSES=ZERO
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING INTERVAL
- GAS WATCH: BACKGROUND = 200 UNITS, MAX =
419 UNITS
- NO BACKREAMING AT CONNECTIONS. SURVEY
EACH CONNECTIONS
-CO-PILOT/ UNDERREAMER NOTES: NO ISSUES TO
REPORT DRILLING THROUGH THE KINGAK
- TOP OF KINGAK CAME IN 9255' MD , —35' HIGH TO
PLAN.
18:00 - 00:00
6.00
INTI
DRILL
DRLDIR
P
YES
DIRECTIONAL DRILL 8-1/2" X 9-7/8" INT HOLE FROM
9,622.0
9311' MO TO 9622' MD IN HRZ / KNGKAK FORMATIONS
(311' IN 6 HRS = 52 FPH WITH CONNECTIONS).
- INSTANTANEOUS ROP = 5030 FPH
- 700 GPM, 3720 PSI ON/OFF BOTTOM, 150 RPM, TRQ
ON/OFF BTM =16/15 KFT-LBS, WOB = 8-13 KLBS
- MW IN/OUT = 10.3
28/06/2017 06:41:64 Version: 5000.1.20170227
North America - ALASKA - BP Page 5 of 7
Daily Operations Report - Partners (RE-ENTER-
ONSHORE)
Operator. BPEXPLORATION Event Type: RE-ENTER-ONSHORE Report: 10
Well/Wellbore No.: J-28/02 Event Objective: DRILLSIDETRACKA Date: 25/06/2017
WB Objective: OIL WELL PRODUCER Wall Type: DEVELOPMENT
Site: PB J Pad Job Number: 2
Contractor: PARKER DRILLING CO. Rig: PARKER 272
Operations Summary
From -To
Hire
Phase
Task
Activity
Code
NPT
Critical
Operation
Op. Depth (usft)
(hr)
Path
- ECD CALC CLEANHOLE =10.85 PPG EMW, ACTUAL =
11.46 PPG EMW, HARDLINE =11.5 PPG EMW
- LOSSES = ZERO
- SOFTSPEED ACTIVE FOR ENTIRE DRILLING INTERVAL
- GAS WATCH: BACKGROUND = 200 UNITS, MAX =
330 UNITS
- NO BACKREAMING AT CONNECTIONS. SURVEY
EACH CONNECTIONS
- 9595' MD 35 BBL LOW VIS / HIGH VIS SWEEP NO
INCREASE IN CUTTINGS.
- CO-PILOT / UNDERREAMER NOTES: NO ISSUES TO
REPORT
-ACTUAL DRILLING HOURS FOR PAST 24 HOUR
REPORTING PERIOD =19.5 HRS, 81%
- DIRECTIONAUGEO NOTES FOR THE DAY: DRILLING
TO DIRECTIONAL WELL PLAN WITH NO ISSUES.
_
06:00 Update
From-To
Hire
Phase
Task
Activity
Code
NPT
Critical
Operation
Op. Depth (usft)
(hr)
Path
00:00 - 06:00
6.00
INT1
DRILL
DRLDIR
P
YES
DIRECTIONAL DRILL 8-1/2" X 9-7/e" INT HOLE FROM
9622 MD TO 9933' MD IN KINGAK FORMATION (311' IN
6 HRS = 52 FPH WITH CONNECTIONS).
-INSTANTANEOUS ROP= FPH
- 700 GPM, 3850 PSI ON/OFF BOTTOM, 150 RPM, TRO
ON/OFF BTM =17/16 KFT-LBS, WOB = 8-13 KLBS
- MW IN/OUT =10.3
- ECD CALC CLEANHOLE =10.93 PPG EMW, ACTUAL =
11.5 PPG EMW HARDLINE = 11.5 PPG EMW
- LOSSES =ZERO
-SOFTSPEED ACTIVE FOR ENTIRE DRILLING INTERVAL
- GAS WATCH: BACKGROUND =180 UNITS, MAX =
206 UNITS
- NO BACKREAMING AT CONNECTONS. SURVEY
EACH CONNECTIONS
- CO-PILOT / UNDERREAMER NOTES: NO ISSUES TO
REPORT.
Mud Log Information
Formation: TKNG
Formation top Col 9,258.00 (usft)
Max Background Gas: 420.00(%)
Max Trip Gas:
Lithology: Shale
Max Connection Gas:
Pore Press:
Materials/Consumption
Item
Unit
Usage
On Hand I
Item Unit Usage
On Hand
FUEL-ARCD-RIG
GAL
0
15,298 FUEL-ULSD-RIG
GAL 473
26,884
FUEL-ULSD-CAMP
GAL
1,192 1
I I
Personnel
Personnel on Board: 32
Company
No. People
Hours
Company
No. People
Hours
BAROID
2
BEACON
2
BP
3
PARKER DRILLING CO.
25
26/06/2017 06:41:54 Version: 5000.1.20170227
26/06/2017 06:41:54 Version: 5000.1.20170227
Page 6 of 7
North America -ALASKA - BP
Daily Operations Report - Partners (RE -ENTER -
ONSHORE)
Operator. SP EXPLORATION Event Type: RE -ENTER -ONSHORE
Report: 10
Well/Wellbore No.: J-28102 Event Objective: DRILLSIDETRACKA
Date: 25/06/2017
WB Objective: OIL WELL PRODUCER Well Type: DEVELOPMENT
Site: PB J Pad Job Number: 2
Contractor: PARKER DRILLING CO. Rig: PARKER 272
Weather
Temperature HIL: 56.00('F) /43.00(-F) Wend Speed: Visibility: 10.00(ml)
Prec Type:
Bar Press: Wird Direction: Ceiling:
Prec Amt.
Wind Chill: - Gust Speed:
Cumulative Phase Breakdown
Phase Planned Change of Scope
Total Hours Total Cost
Prod %Total NPT %Total WOW % Total Prod %Total NPT %Total I WOW %Total
DECOMP 15.00 100.001 0.00 0.00 a00 0.00. 0.00
0.00 15.00 0.00
INTI 111.00 94.47 6.50 5.53 0.00 0.00
0.00
0.00 117.50 1,181,829.50
PRE 40.00 59.70 27.00 40.30 0.00 O.OD
0.00
0.00 67.00 1,278,201.60
WEXIT 22.50 100.00 0.00 0.00 0.00 0.00
0.00
0.00 22.50 252,304.40
Grand Total 168.50 84.91 33.50 15.09 0.00 0.00 0.00 0.001
0.00 0.00 0.00
0.00 222.00 2,712,335.50
Remarks
PJSM PRIOR TO ALL TASKS, 5X5 AFTER STARTING TASKS AND AAR FOLLOWING CRITICAL TASKS TO CAPTURE LEARNINGS.
SPILL CHAMPION MAKES TOURLY WALKAROUND WITH CHECKLIST.
WELL MONITORING MATRIX SIGNED AND IN PLACE DURING DRILLING OPERATIONS.
WSL COMPLETES TOURLY CHECK OF ALARM SETTINGS.
DRILLER CHECK SAVER SUB, SETAND TEST CROWN SAVER AND BRIDGE PROTECTION.
CREW PERFORMING TOURLY ENVIRONMENTAL WALKS AROUND THE PAD TO INSPECT FOR SIGNS OF BROACHING.
WELLSITE LEADER VERIFICATION OF SLIP, TRIP AND FALL HAZARD POTENTIAL AROUND MUSTER AREAS.
YEAROUT CREW (NOON TO MIDNIGHT)
- FULL CREW
FISCHER CREW (MIDNIGHT TO NOON)
- FULL CREW
- (D2) KICK WHILE DRILLING DRILL WITH AAR
INTERMEDIATE HOLE SECTION LOSSES:
DAILY- 0, WELL TO DATE- 0
9-5/8"
TOW - 2953' MD
BOW - 2967' MD
Marker MD TVD +/- to PROG
KOP 2953 2952 NIA
SV3 3153 3149 on prog
SV2 3293 3284 3' high
SV1 3714 3666 5' high
UG4 4301 4104 34' low
UG4A 4361 4140 34'lm
UG3 4888 4423 77' low
UG1 6153 5094 18' low
WS2 6682 5376 31' high
WS1 7055 5574 14' high
CM3 7462 5789 8' high
CM2 7796 5997 26' low -
CM1 8577 6671 62' high
HRZ 8943 7034 38' high
KNG 9142 7233 34' high
OUTER ANNULUS BLEED TRACKER:
-6119/17 18:00, BLEED FROM 960 PSI TO 450 PSI
-6119/17 19:30, BLEED FROM 960 PSI TO 325 PSI
26/06/2017 06:41:54 Version: 5000.1.20170227
North America - ALASKA - BP Page 7 of 7
Daily Operations Report - Partners (RE -ENTER -
ONSHORE)
Operator: BP EXPLORATION Event Type: RE -ENTER -ONSHORE Report: 10
Well/Wellbore No.: J-28102 Event Objective: DRILL SIDETRACK A Date: 25/06/2017
WB Objective: OIL WELL PRODUCER Well Type: DEVELOPMENT
Site: PS J Pao Job Number: 2
Contractor: PARKER DRILLING CO. Rig: PARKER 272
Remarks
- 6/20/17 20:00, BLEED FROM 930 PSI TO 430 PSI IN -5 MIN.
- 6122/1714:00, BLEED FROM 930 PSI TO 320 PSI IN -4 MIN
- 6122/17 20:00, BLEED FROM 850 PSI TO 285 PSI IN -3 MIN.
- 6/23/17 03:40, BLEED FROM 820 PSI TO 160 PSI IN -4 MIN.
- 6/24/17 09:00, BLEED FROM 900 PSI TO 600 PSI IN -4 MIN. NO FLUID OBSERVED DURING BLEED DOWN.
- 6/25/17 12:00, BLEED FROM 825 TO 150 PSI IN -3 MIN. NO FLUID OBSERVED DURING BLEED DOWN
26106/2017 06:41:54 Version: 5000.1.20170227
THE STATE
°fALASKA
GOVERNOR BILL WALKER
Ken Allen
Engineering Team Lead
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU J -28A
BP Exploration (Alaska), Inc.
Permit to Drill Number: 217-075
Surface Location: 799' FNL, 1731' FEL, Sec. 09, TI IN, RI 3E, UM
Bottomhole Location: 243' FNL, 617' FEL, Sec. 08, TI IN, RI 3E, UM
Dear Mr. Allen:
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.00gcc.alaska.gov
Enclosed is the approved application for permit to re -drill the above referenced development well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Cathy P. Foerster
Chair
DATED this 16 day of May, 2017.
STATE OF ALASKA
LASKA OIL AND GAS CONSERVATION COMMIS
PERMIT TO DRILL
20 AAC 25.005
MZGEIVED
MAY 11 n11
Ia. Type of Work:
ib. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑
1c. Spec for:
Drill F1 Lateral ❑
SVatlgraphic Test ❑ Development -Oil 0 ' Service - Winj ❑ Single Zone 0.
Coalbed Gas ❑ Gas Hydrates ❑
Redrill 0. Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket 0 - Single Well ❑
11. Well Name and Number.
BP Exploration (Alaska), Inc
Bond No. 295105380
PBU J -28A -
3 Address:
6. Proposed Depth:
: 12. Field/Pools
( )
P.O. Box 196612 Anchorage, AK 99519-6612
MD: 17539' • TVD: 8641' -
PRUDHOE BAY, PRUDHOE
OIL '
4a Location of Well (Governmental Section):
7. Property Designation (Lease Number):
ADL 028281 & 028282 •
Surface: 799' FNL, 1731' FEL, Sec. 09, T1 1N, R13E, UM
8. Land Use Permit:
13. Approximate spud date:
Top of Productive Horizon: 2671 FSL, 1017' FEL, Sec. 04, T11 N, R13E, UM
85-24
July 1, 2017
9. Acres in Property: 2560 & 2469
14. Distance to Nearest Property:
Total Depth: 243' FNL, 617' FEL, Sec. 08, T1 1N, R13E, UM
14600
4b. Location of Well (Stale Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL: 86.66 •feet
15. Distance to Nearest Well Open
Surface: x- 642621 • y- 5970537 ' Zone - ASP 4
GL Elevation above MSL: 39.51 feet 1
to Same Pool:
130
16. Deviated wells: Kickoff Depth: 2955 feet
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 112 degrees
Downhole: 3212 ' Surface: 2356 '
18, Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casin Wei ht Grade I cru lin L n th
MD TVD MD TVD(including steps data
26# L-80 VamTop HC 11540'
Surface Surface 11540' 8623' 212 sx Class'G'
6-118" -12' 2.6#/13. H ddl 521 6148'
11390' 8496' 17538' 8641' 669 sx Class'G'
19. PRESENT WELL CONDITION SUMMARY (To be completed for Rechill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft):
Plugs (measured):
Effect. Depth MD (ft):
Effect. Depth TVD (ft):
Junk (measured):
11200 9194
10876,10885
10876
8969
10842, 10880,10938
Casing Length Size Cement Volume MD TVD
Conductor/Structural 80 20' 8 cu We Concrete 40-120 40-120
Surface 2647 113/8" 3723 cu fe Permafrost C 40-2086 40-2086
Intermediate 10212 9-518" 2167 cu ft CLass'G' 38-10250 38-8508
Production
Liner 1211 7• 401 cu It Class'G' 9989-11200 8312-9194
Perforation Depth MD (ft): 10850 -10964 Perforation Depth TVD (ft): 8951-9032
20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Rasse. J. Kvle
from without prior written approval.
Email john.mesena bp.com
Printed Name Ken Allen Title Engineering Team Lead
Signature�P[J Ci __ Phone +1 907 564 4366 Date,f I
Commission Use Only
Permit to Drill
Number Zl7-C_ (-
API Number: 50. 029-21721-01-00
Permit Approval
Date: {_ (�� ��
See cover for other
requirements:letter
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales:
-
Omer. 50P f1�5 t f0 35.00 /.05 1 G Samples req'd: Yes ❑ - No 0/ Mud log req'd: Yes ❑/ No lif/
J �
%r7R. h (J�GL ✓ /7 rrll!-rf r- H2S measures Yes No ❑ / Directional svy req'd: Yes G No ❑ ,
/_ �SC7O h r Spacing exception req'tl: Yessr 0 No V Inclinationonly svy mq'd: Yes 11 No
L -U` T re -q U! t -f e a 7 f l r h^ t ( t t,1 y i / r lam) n PPst�al injection MIT eq'd: Yes 13 No Fly
Q -I- U r
'?
APPROVED BY
Approved by: {�y�-- COMMISSIONER THE COMMISSION Date:5-(g_/
ORIGINAL VTL 511S07 -
Form, 10401 Revised 112015 This permit is valid for 24 months from the dale of approval (20 AAC 25.005(g)) Submit Form and
Attachments in Duplicate
by
To: Alaska Oil & Gas Conservation Commission
From: Kyle Raese, ODE
Date: May 8, 2017
RE: J -28A Permit to Drill
The J -28A well is scheduled to be drilled by Parker 272 in July 2017. This sidetrack is a horizontal
producer targeting the Sag River horizon. The planned well is a two string, ultra-slimhole design using
7" intermediate casing and 4-1/2" production liner. The intermediate casing will be set at the top of the
Sag River, and the production interval will be completed with a cemented and perforated liner.
The maximum anticipated surface pressure from the Sag River with a full column of gas from TD to
surface is 2,356 psi (assumes 7.22 ppg EMW most likely pore pressure and a 0.1 psi/ft gas gradient)
The well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3 rams and an
annular). The BOP rams and annular will be tested to 3,500 psi.
A detailed operations summary is included with the permit application.
If there are any questions concerning information on J -28A, please do not hesitate to use the contact
information below.
Kyle Reese Office: (907) 564-4629 Cell: (907) 301-6405 Email: john.raese@bp.com
Attachments:
Well Bore Schematic BOPE Schematic
Proposed Pre -Rig Schematic Well Head Schematic
Proposed Completion Tree Schematic
Directional Package
J -28A PTD 1 5/8/2017
Planned Well Summary
Well J -28A . Well Producer Ob aTarctive et Sag River,
Current Status Shut -In
Estimated Start Date: 1 07/01/2017 Time to Com Tete: 30.5 Day -s--7
Surface
Northin
Easting
I Offsets
I TRS
Location
5,970,537
1 642,621
1 799.2' FNL / 1731.9' FEL
11 N 13E Sec 9'
Planned KOP: 2,955'M Planned TD: 17,538' MD / 8,554' TVDss
Rig: Parker 272 GL -RT: 1 47.15 RTE ref MSL : 86.66'
Directional - Baker wp07A
KOP: I 2,955' MD
NorthinA
Eastina
TVDss
Offsets
TRS
Tgt 1
5,974,020
643,262
8,536
2608.4' FNL / 1016.6'
11N 13E Sec 4
TSGR
-14,600'
Nearest Well within Pool:
1 -130'
FEL
Tgt
BHL
5,971,015
638,445
8,554
242.8' FNL / 617.1'
11N 13E Sec 8
FEL
Planned KOP: 2,955'M Planned TD: 17,538' MD / 8,554' TVDss
Rig: Parker 272 GL -RT: 1 47.15 RTE ref MSL : 86.66'
Directional - Baker wp07A
KOP: I 2,955' MD
Maximum Hole Angle:
-670 in the intermediate section
-112 in the production section
Close Approach Wells:
All offset wells pass BP anti -collision scan criteria, but some offsets
must be shut-in to pass scan criteria - see below for details.
Survey Program:
See attached directional program
Nearest Pro a Line:
-14,600'
Nearest Well within Pool:
1 -130'
J -28A PTD 2 5/11/2017
Formation Tops and Pore Pressure Estimate (SOR)
Formation
Depth (TVDss)
Most Likely Pore
Pressure(ppg)
Fluid Type (for
sands only)
SW
2617
8.40
KOP - 9 5/8"
2868
8.40
SV3
3063
8.40
Water
SV2
3201
8.40
Water
3584
8.40
Water
SV1
3585
9.00
Water
UG4
3985
9.30
Water
UG3
4260
9.30
Water
UG1
4990
9.30
Water
5319
9.30
Water
WS2
5320
8.70
Water
WS1
5502
8.70
Water
5710
8.70
Water
CM3
5711
9.30
CM2
5886
9.80
CM1
6647
9.80
6985
9.80
THRZ
6986
9.75
LCU
7181
9.80
TKNG
7284
9.80
TJF
7598
9.80
TJE
7773
9.80
TJD
7983
9.85
TJC
8266
9.90 '
TJB
8376
10.05
TJA
8451
10.05
8535
10.05
TSGR
8536
7.22
Gas/Oil
8570
7.22
Gas/Oil
TSHU
8571
7.20
8653
7.20
TSAD
8654
7.15
Gas/Oil/Water
INVERT
8810
7.05
Gas/OIIMlater
TCGL
88377.04
Gas/Oil/Water
BCGL
8908
7.00
Gas/Oil/Water
kv"�Cl- Lpe
S. /S. 20 7
J -28A PTD 3 5/8/2017
Casing/Tubing Program
Hole Size
Liner I
Tbg O.D.
MIR
Grade
Conn
Length
Top
Bottom
API FL HTHP FL MBT
pH
KOP - TH RZ I 9.2 -10.0 •
10-18
18-25
<8 NA <20
MD / TVDss
MD / TVDss
8-1/2"
7"
26#
L-80
VamTop HC
11,540'
Surface
11,540'/ 8,536'
6-1/8"
4'A"
12.6#-
13.5#
13Cr-85
Hydril521
6,148'
11,390'18,409'
17,538'/8,554'
(150' lap)
Tubing
4 %"
12.6#
13Cr-85
VamTop
11,395'
Surface
11,395'/8,413'
(-5' into liner TBR)
Mud Program
Intermediate Mud Properties: LSND
Depth Interval Density
PYP
V (cp)
8-1/2" Hole
Section
Depth Interval Density
PV (cp)
IbMO k2
API FL HTHP FL MBT
pH
KOP - TH RZ I 9.2 -10.0 •
10-18
18-25
<8 NA <20
8.5-9.5
THRZ - TD 10.2 - 11.0 .
10-18
I 18-25 1
<5 <10 <20
8.5-9.5
Production Mud Properties, Water Based Pol mer Fluid 6-1/8" Hole Section
Depth Interval Density
PYP
V (cp)
fib/100n fib/100n
API FL
HTHP FL AABT
pH
7" Shoe - TD 1 8,0-0.0
1 <8
I 12-20
1 <12
1 NA <4
1 8,5-9,5
Logging Program
8-1E2" Intermediate
S le Catchers - as required by Geolociv
Drilling:
Dir/GR/RES -
Open Hole:
I None
Cased Hole:
I None
6-1/6" Production
Sam le Catchers - as reguired by Geology
Drilling:
Dir/GR/GRAB/RES/NEU/DEN/IMAGE
Oen Hole:
I None
Cased Hole:
I None
J -28A PTD 4 5/11/2017
Cement Program
Casing Size
7"26#11-40 mTop HC Intermediate Casing
Lead
N/A
Basis
Lead TOC
N/A
Tail
Oen hole volume + 40% excess + 80 ft shoe track
Tail TOC
1300 ft MD above casing shoe
S acer
-50 bbls of Viscosified Spacer weighted to -12 Mud Push II
Total Cement
Lead
N/A
Volume
1 Tail
44.2 bbls, 248 cult, 212 sks 15.8 lb/gal Class G - 1.17 cuft/sk
Temp
BHST 205° F
Casing Size
4-1/2" 12.6#-13.5# 13CR-85 HYD 521 Production Liner
Lead
N/A
Basis
Lead TOC
N/A
Tail
Oen hole volume + 30% excess + 80 ft shoe track + 200'4" DP x 7" LNR annulus
Tail TOC
Top of liner
Spacer
-50 bbls of Viscosified Spacer weighted to -12 Mud Push II
Total Cement
Lead
N/A
Volume
Tail
139.3 bbls, 782 cuft, 669 sks 15.8 Ib/gal Class G -1.17 cuftlsk
Contin enc . 6.616/ al Bi Modal lightweight cement in event of high lost circulation
Tem
BHST 205° F
Surface and Anti -Collision Issues
Surface Close Proximity:
No wells will be affected by the Parker 272 rig shadow.
Anti -Collision:
All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan
criteria:
• J-07: Shut-in with tubing tail plug during intermediate section drilling
• J-11: Shut-in at surface during production section drilling
• J-17: Shut-in with tubing tail plug during intermediate section drilling
• J-27: Shut-in with tubing tail plug during intermediate section drilling
Offset well ownership information
All offset wells identified within 200 ft of the proposed wellbore are operated by BP.
J -28A PTD 5 5/11/2017
Hydrogen Sulfide
J -Pad is considered an H2S site. Recent H2S data from the cad is as follows
Faults
Formation Where
Fault Encountered
Well Name
H2S Level
Date of Reading
Parent Well
J-28
20 ppm .
5/27/2016
#1 Closest SHL Well H2S Level
J -27B
12 ppm
02/02/2016
#2 Closest SHL Well H2S Level
J -18A
14 ppm
02/01/2016
#1 Closest BHL Well H2S Level
J-12
14 ppm
01/12/2016
#2 Closest BHL Well H2S Level
J-05CL1
6 ppm
05/28/2016
#3 Closest BHL Well H2S Level
J -11A14
ppm
01/31/2016
#4 Closest BHL Well H2S Level
J-21
12 ppm
06/20/2016
Max Recorded H2S on Pad/Facility
J-26
110 ppm
12/15/1997
Faults
Formation Where
Fault Encountered
MD
Intersect
TVDss
Intersect
Throw Direction and
Magnitude
Uncertainty
Lost Circ
Potential
Sag River Fault 1)
14,240' 1
8,567'
1 35' DTW
+/_ 150'
Medium
Sag River Fault 2
15,260'
8,593'
1 25' DTE
+/- 250'
Medium
Sag River Fault 3
16,230' 1
8,563'
1 25' DTE
+/_ 250'
Medium
Sag River(Fault 4)
17,035'
8,542'
30' DTW
+/_ 200'
Medium
Drilling Waste Disposal
• There is no annular injection in this well. -
• Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and
inject at DS -04. Any metal cuttings will be sent to the North Slope Borough.
• Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for
injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB
Environmental Advisors (659-5893) for guidance.
J -28A PTD 6 5/8/2017
Well Control
The 8-1/2" and 6-1/8" hole sections will be drilled with well control equipment consisting of 5,000 psi
working pressure rams (2), blind/shear rams, and annular preventer capable of handling the
maximum potential surface pressures. Based upon calculations below, BOP equipment will be
tested to 3,500 psi.
BOP test frequency for J -28A will be 7 days until the window is milled and then will be 14 days
with function test every 7 days. Except in the event of a significant operational issue that may
affect well integrity or pose safety concerns, an extension to the 14 day BOP test period
should not be requested.
8-112" Intermediate Interval
Maximum anticipated BHP
3,205 psi at the TSGR at 8,536' TVDss 7.22 ppg EMW)
Maximum surface pressure
2,351 psi at the TSGR 0.10 sift gas gradient to surface
Kick tolerance
25 bbls with 13.2 ppg frac gradient (existing surface casing LOT)
Assumes 7.22 ppg pore pressure in the SGR + 0.5 ppg kick
intensitv and 10.3 MW.
Planned BOP test pressure
Rams test to 3,500 psi / 250 psi.
Annular test to 3,500 psi / 250 psi
Inte ri Test — 8.1/2" hole
None — see variance request below
7" Casing Test
3,500 psi surface pressure
6-1/8" Production Interval
Maximum anticipated BHP
3,212 psi in the SGR at 8,554' TVDss (7.22 ppq EM
Maximum surface pressure
2,356 psi 0.10 psi/ft gas gradient to surface
Kick tolerance
Infinite with >9.9 ppg frac gradient.
Assumes 7.22 ppg pore pressure in the SGR + 0.5 ppg kick
intensity and 8.7 ppq MW.
Planned BOP test pressure
Rams test to 3,500 psi / 250 psi.
Annular test to 3,500 psi / 250 psi
Integrity Test — 6-1/8" hole
FIT after drilling 20'-50' of new hole
4-1/2" Liner Top Packer
3,500 psi surface pressure
Planned completion fluids
8.5 ppg seawater / 2,000' TVD diesel
J -28A PTD 7 5/8/2017
Drill and Complete Operations Summary
Pre -Rig Prep Work:
1.
F
Fullbore P&A. -35 bbl 15.8 ppg Class G Cement. TOC -9790' MD.
2.
S
D&T TOC. Pull DGLV. MTT Log.
3.
F
CMIT-TxIA to 3500 psi.
4.
F
Circ Cement Plug. TOC -8700' MD.
5.
S
D&T Cement. Drift for Jet Cut.
6.
F
CMIT-TxIA to 3500 psi.
7.
E
Jet Cut TBG at -3000' MD.
8.
F
CMIT-TxIA to 3500 psi. MIT -OA to 2500 psi.
9.
W
PPPOT-T and IC. Function LDS.
10.
V
Install Dry Hole Tree. Install Annulus Valves. Set TWC.
Proposed Drilling Rig Operations:
1. MIRU Parker 272.
2. Test TWC from above and below to 3500 psi.
3. Nipple down dry hole tree. Nipple up BOPE and test to 3500 psi.
4. Pull TWC. Circulate out freeze protect with 8.5 ppg seawater.
5. RU and pull the 4-1/2" tubing from the pre -rig jet cut at -3000' MD.
6. PU 9-5/8" casing cutter and cut 9-5/8" casing below wellhead.
7. Pull 9-5/8" casing. Test IAxOA to 2500 psi to confirm integrity.
8. PU 8-1/2" clean-out assembly and clean-out 9-5/8" casing to tubing stub at 3000' MD.
POOH.
9. Run 9-5/8" scoop guide assembly and engage 9-5/8" casing stub at -120' MD.
10. PU 9-5/8" whipstock and 81/2" window milling assembly. Orient and set the whipstock.
11. Displace the well to LSND milling fluid.
----------------------------End of Sundry /Start of Permit to Drill ----------------- ------- LT,T
12. Mill window in 9-5/8" casing plus 20' of formation. L
POOH.
13. MU 8-1/2" intermediate motor BHA (GR/RES/PWD) and drill build section to -3800' MD.
POOH and LD motor assembly.
14. MU 8-1/2" intermediate RSS BHA (GR/RES/PWD) and drill to TD -11,540' MD in TSGR.
Perform short trip. POOH and LD drilling assembly.
15. Run 7" casing to TD and cement. Test casing to 3500 psi.
16. MU 6-1/8" production motor BHA (GR/RES) and drill shoe track and 20'-50' formation.
17. Perform FIT.
18. Drill 6-1/8" build section to -12,300' MD. POOH and LD motor assembly.
J -28A PTD 9 5/11/2017
Variance Requests V- '/� I—( GI f, C Z5- G/ T7" l r d kTL
A variance is requested to not perform the LOT after milling the 9-5/8" casing window. This is a _
variance from 20 AAC 25.030 (f). Instead of performing a LOT at the window, the proposed plan is to
drill the intermediate section using the original surface casing shoe LOT value of 13.2 ppg EMW. The
justification for variance is as follows:
• There will be no cement behind 9-5/8" casing at the window at —3000' MD. Estimated top of
cement is 5051' MD (assuming 30% open hole washout). A LOT performed at the window
would not exclusively test the integrity of the formation at the window. Rather, it would test
—2400' of open hole between the surface shoe and estimated top of cement.
• Using the surface casing shoe LOT in a window exit sidetrack complies with the grassroots
standard of using the surface shoe LOT for the intermediate section.
• Performing a LOT at the window would be like performing a LOT part way through drilling the
intermediate section of a grassroots well which is not the goal of a LOT.
• The existing surface casing LOT value of 13.2 ppg EMW provides sufficient kick tolerance
(>25 bbl) per BP standards.
J -28A PTD 8 5/8/2017
19. MU 6-1/8" production RSS BHA (GR/GRAB/RES/NEU/DEN/IMAGE) and drill to TD at
—17,538' MD in Sag River. Perform short trip. POOH and LD drilling assembly.
20. Run 4-1/2" liner to TD and cement. Set hanger and liner top packer. Displace well to 8.5 ppg
seawater. POOH and LD liner running assembly.
21. Test liner / liner top packer to 3500 psi.
22. Contingency. Run 2500' of guns and perforate production liner.
23. Run and land 4-1/2" completion.
24. Reverse circulate 8.5 ppg seawater with corrosion inhibitor. Drop ball and rod and set
production packer. Individually test tubing and IA to 3500 psi.
25. Shear GLV and circulate freeze protect to —2000' TVD. Set TWC and test to 3500 psi.
26. Nipple down BOPE. Nipple up adapter and dry hole tree and test to 5000 psi.
27. RDMO Parker 272.
Post -Rig Work:
1
V
Install tree. Pull TWC.
2
SL
Pull BBR. Set LGLV.
3
C
Perforate with wellwork platform
4
T
Flowback/Test
J -28A PTD 10 5/8/2017
J -28A Drilling Critical Issues
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control / Reservoir Pressures
A. Intermediate Hole: The SV formation is expected to be 8.4 — 9.0 ppg EMW. The Ugnu is expected
to be 9.3 ppg EMW. The West Sak is expected to be 8.7 ppg EMW.' The Coleville is expected to
be between 9.3 - 9.8'ppg EMW. Formation pressures will be controlled with a 9.2 — 10.0 ppg mud .
to drill up to the HRZ. At this point, there will be a weight up to 10.2 — 11.0 ppg to drill the rest of
the interval to TD.
B. Production Hole: The Sag River and Ivishak is expected to be 7.22 ppg EMW. Reservoir
pressures will be controlled by using 8.5 — 8.8 ppg water based mud.
II. Lost Circulation/Breathing
A. Intermediate Hole: There are no expected fault crossings in the intermediate hole. However,
breathing has been known to occur in the Colville on other Drill Sites in Prudhoe Bay as a result
of high ECDs.
B. Production Hole: There are 4 expected fault crossings in the production hole with a medium risk
of lost circulation to the Sag -River.
III. Fault Locations
Formation Where
Fault Encountered
MD
Intersect
TVDss
Intersect
Throw Direction and
Ma nitude
Uncertainty
Lost Circ
Potential
Sag River Fault 1
14,240'
8,567'
35' DTW
+/_ 150'
Medium
Sag River Fault 2
15,260'
8,593'
25' DTE
+/- 250'
Medium
Sag River Fault 3
16,230'
8,563'
25' DTE
+/- 250'
Medium
Sag River Fault 4
17,035'
8,542'
30' DTW I+/_
200'
Medium
IV. Integrity Testing
_ Test Point Test Depth Test type _EMW /l_h/aa_n
13-3/8" Shoe 20'-50' from the 13-3/8" shoe LOT 13.2 noa*
7' shoe 20'-50' from the 7" shoe FIT 9.9 ooa
r-enormea aunng parent weuoore construction
V. Hydrogen Sulfide j
J -Pad is considered an H2S site. Recent H2S data from the pad is as follows:
VI. Anti -Collision Issues
➢ None. All offset wells pass BP Anti -collision Scan Criteria.
CONSULT THE J -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION.
J -28A PTD 11 5/8/2017
Well Name
H2S Level
Date of Reading
Parent Well
J-28
20 ppm
5/27/2016
#1 Closest SHL Well H2S Level
J -27B
12 ppm
02/02/2016
#2 Closest SHL Well H2S Level
J -18A
14 ppm
02/01/2016
#1 Closest BHL Well H2S Level
J-12
14 ppm
01/12/2016
#2 Closest BHL Well H2S Level
J-05CL1
6 ppm
05/28/2016
#3 Closest BHL Well H2S Level
J-1 1A
14 ppm01/31/2016
#4 Closest BHL Well H2S Level
J-21
12 ppm
06/20/2016
Max Recorded H2S on Pad/Facility
J-26
110 ppm
12/15/1997
VI. Anti -Collision Issues
➢ None. All offset wells pass BP Anti -collision Scan Criteria.
CONSULT THE J -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION.
J -28A PTD 11 5/8/2017
Max Angle = 48' @ 5800
Datum MO=_ 1074T
Datum TVD= 88WSS
20^ COrDl1CTOR 91.5#, H40, ID= 19.124'110'
13-3/8• CSG, 72#, L-80, BTRS, D = 12.347'670
Minimum ID = 3.726" @ 10021-
4-1/2" OTIS XN NIPPLE
4-1/2• TBG, 12.6#, 13CR-80 VAM TOP,
.0152 bpf, D = 3.958^
TOP OF 7- LNR
1/2' TBG, 12.6#, L-80, .0152 bpf, D = 3-958' — 10054'
9-5/8' CSG, 47#, L-80, BTRS, D = 8.681' 10260'
PERFORATION SLAW ARY
REF LOG: BRCS ON 06/09/87
ANGLE AT TOP PERF. 45 @ 10850
NDte: Fefer to production DB for Nstorical pert data
SIZE I SPF I INTERVAL OpnISgz DATE
3-3/8-1 4 1 10850- 10860 O 07/10/99
3-3/8' 4 1 10890-10964 C 0728/00
7^ LW
=s.z7s^ H 11 zoo•
J-28
.AFETY NOTES
14-12^ FES X NP, D
GAS I IFT LIA WAR S
ST
M)
VVELLHEAD=
WEVOY
ACTUATOR=
BAKER
KB. H.EV =
77.11'
BF. EEV =
40.81'
KOP=
3200'
Max Angle = 48' @ 5800
Datum MO=_ 1074T
Datum TVD= 88WSS
20^ COrDl1CTOR 91.5#, H40, ID= 19.124'110'
13-3/8• CSG, 72#, L-80, BTRS, D = 12.347'670
Minimum ID = 3.726" @ 10021-
4-1/2" OTIS XN NIPPLE
4-1/2• TBG, 12.6#, 13CR-80 VAM TOP,
.0152 bpf, D = 3.958^
TOP OF 7- LNR
1/2' TBG, 12.6#, L-80, .0152 bpf, D = 3-958' — 10054'
9-5/8' CSG, 47#, L-80, BTRS, D = 8.681' 10260'
PERFORATION SLAW ARY
REF LOG: BRCS ON 06/09/87
ANGLE AT TOP PERF. 45 @ 10850
NDte: Fefer to production DB for Nstorical pert data
SIZE I SPF I INTERVAL OpnISgz DATE
3-3/8-1 4 1 10850- 10860 O 07/10/99
3-3/8' 4 1 10890-10964 C 0728/00
7^ LW
=s.z7s^ H 11 zoo•
J-28
.AFETY NOTES
14-12^ FES X NP, D
GAS I IFT LIA WAR S
ST
M)
I TVDJ
CEI
I TYPE
I VLV
ILATCHIPOW1
9-5/8^ TNV HBBP PKR ID
DATE
5
3141
3139
9
AMG
DAM
RK
0
07/08/16
4
5474
5014
48
MIG
DAN
R(
0
07/08/16
3
6922
5992
46
AMC
DAM
RK
0
07/10/06
2
8289
7011
36
MIG
DAM
RK
0
07/10/06
1
9573
8007
42
AMr.
CMY
RK
0
07/10/06
3.813^
9-5/8' X 4-12' BKR S3 PKK D =
4-12^ FES X W, —ID= 3.813'
9898• —i
TBG STIR (DIMS - TAGGED 07/07/1
9892•
9-5/8'x4-12^ LMLE OVERSHOT
9930'
Tl18NG SEAL ASSY
07119/06 O57/ILH OFiLG DRAFT COR4M)NS
9-5/8^ TNV HBBP PKR ID
9989'
10021•
4-12^ OTIS X NP, ID
41/7 OILS XN np D=x775•
10066'BMD TT LOGE® 0629/00
-10842' I BTM 12 OF 3-3/8• IBP (122,
TAGG®07/11106
NKNOW N 3-3/8^ BAKER EP (0626/06)
1
10938' HBP-
DATE FEV BY COAMEN
DATE FE/BY CORM MIS
0925187 OF11GINAL COMPLETION
07/13/16 JMG/JAD GLV CJO (07/08/16)
0 711 2 /11 6 N46IBNO
07119/06 O57/ILH OFiLG DRAFT COR4M)NS
07/30/06 MSSIPAG GLV 00 (07128/06)
0824106 DMITLH DRAFTFM I-CORT:CTIONS
11/03/15 DIYAD TREFCJo(10n3/15)
FRIAHDEBAY INF
WELL: J-28
PEFUT NO: '1870410
AR No: 50-029-21721-00
F11 K R13F 799' SNL 8 1731' WEL
BP Exploration (Alaska)
717EE = 6-3/8' CNV I
VYBLF£AD=
WEVOY
ACTUATOR=
BAKER
KB. 9 -EV =
77.11'
BF. AEV =
40.81'
KOP=
3200'
Mbx Angle =
48" Q 5800'
Datum MD=
1074T
Datum TVD=
8800SS
P&A
PRE -RIG
20' CONOL CTOR 91.54, R 40, D = 19.124-
13-3/8' CSG, 724, L-80, BTRS, D = 12.347-
1 2670' 1
EST TOC 18700'
Minimum ID = 3.726- @ 10021-
4-1/2- OTIS XN NIPPLE
J-28
1 .AFETY NOTES
141/7 FES X NP, D =
4-12- TBG CUT
GAS LET MANDRELS
ST
MD I ND
I DEVI
TYPE I VLV
IGATCH
Poffrj
DATE
5
3141 3139
9
NMG DWRK
0
07108/16
4
5474 5014
48
AMX' DW
RK
0
07108!16
3
6922 5992
46
LW D
RK
0
07/10106
2
8289 7011
36DW
MMG DMt'
RK
0
07110106
1
9573 8007
42
MMG DMY
RK
0
07/10/06
j 9791' x-19-518- X 4-1/2- BKR S3 PKR D = 3
♦♦ 4 14
o���
REV BY COW34TS
TBG. 12.600, 13CR-80 VAM TOP, 1��� Imo" `I;, 1���
III.
• a• 0
• 1��1
INS�•
i
07/13/16 JMG/JI•D GLV GO (07/08/16)
OI`Ksist1 1•�• i
140, 050 1111
WES RWO
05/02/17 KR/JMD PRE -RG PSA CREATE)
07/19/06
• • • Ii4i ;y��I�I�I���
7� �I`4 N
E y� car v. r:v: .EffTrnm
• -
), .0152 bpf, D = 3.958- 10064'
L-80, BTRS, D= 8.681- 1025W
PERFORATION SUb111ARY
REF LOG: BRCS ON 06/09/87
ANGLEATTOP PB'7F: 45 TQ 10850
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL OprJSgz DATE
3-3/8' 4 10850 - 10860 S
3-3/8' 4 10890 - 10964 S
PBro
7- LNR 269, L-80, BTRS, .0383 bpf, D = 6.276-
j 10064' 1j4-12- TBG TAIL
10066' �I.1D TT LOGG® 06/29/00
I -10842' 1
1 10938' 1
DATE
REV BY COW34TS
DATE REV BY OOMM94TS
09126!87
ORIGINAL COMPLETION
07/13/16 JMG/JI•D GLV GO (07/08/16)
07112M6
WES RWO
05/02/17 KR/JMD PRE -RG PSA CREATE)
07/19/06
DCR/TLH MLG DRAFT ODIaEC710PS
07/30106 MMPAG GLV C/O (07128106)
0824/06
DCRRLH DRAFT FINAL CORIECTIONS
11103115
DLVJMD Tf7E=C/O(10/13/15)
07/11/06
PRIDFOE BAY LUT
WELL: J-28
PNMT ND: •1870410
API No: 50-029-21721-00
111 N R13E, 799' SNL 8 1731'
BP &ploration (Alaska)
LLFEAD= McEVOY PROPO: L
rUATOR = J -2 8 A
AFETY NOTES: CHROME TBG &LNR
REV
DATE REV BY COWAENTS
3.aIv= n.1v
ELEV = 40.81• 20" COND, 110•
06/02/17 KB/JMD BULTPRDP(:)S®REV3
'= 2955' 91.5#, H-40,
9-SIS"SCOOP GUD�D=�
Angle = _° @ _' D =19.124"
13-3/B' WYB2 Rl1G
" CSG STL �
an MD =_ 9-5/8EPA
4-1/2- FES X NP, D = 3.813'
45/8' BOWEN CSG PATCH, D=_"
08131/16
MLLOUT WNDOW (J -28A) -2955'--'
133/8' CSG, 72#, L-80, BTRS, D - 12.347' 2670• /
9-5/B"WHPSTO(7(! / / 1 911t:R• -
GASLFTMAh1TiELS
Minimum ID = " @'
4-1/2•• HES XN NIPPLE
TOP OF 4-1/2" LNR �y
4-1/2" TBG, 12.6#, 13CM26 VAM TOP, —
.0152 bpf, D = 3.958"
;, 26#, L-80, V AM TOP HC, D = 6.276"
4-1/2' LNR, 12.6#, 13CR-85 HYD 521, --C
.0152 bpf, D = 1958"
PERFORATION St1MFARY
REF LOG: ON _/_/_
ANGLE AT TOP PERF: _° @
Note: Refer to Production DB for historical pert data
SIZE I SPF I INTERVAL Opn/Sgz I LATE
PBTD —
41/2" LNR, 13 5#, 134
.0149 bpf, D = 3.920"
1/2" FES X NP, ID = 3.813-
X 4-1/2' HES TNr PKR, D=
/2"HFSX NP, D=3.813'
/2" HES XN NP, ID = 3.725"
{ 1139W 7" X 5' D = Lw /TEBACK SLEEV E 6 WFD
FIGR, WFD _"TP
4-1/2" WLEG, D= 1958"
ELMO TT NOT LOGGED
I PUP JT w /RA TAG I
DATE
REV BY
CONWENTS
DATE REV BY COWAENTS
09125187
ORIGINAL COMPLETION
06/02/17 KB/JMD BULTPRDP(:)S®REV3
07112106
NOES
RIND
_I_I_
SIDETRACK JJ -28A)
08131/16
JMD
BUILT PROPOSED
09/01/16
BG/JtrD
BUILT PROPOSED REV 1
05/02/17
KR/JMD
BUILT PROPOSED REV
PRIAHOE BAY LW
WELL: b28A
PERMT No:
AR Nb: 50-029-21721-01
SEC 9. T1 W R13E� 799' FNL & 1737 FE_
BP Exploration (Alaska)
ADW
WELL J-28 eCAMERON
WELL �.
Existing Equ.
o.
_0-
121-1/2"
67-1/2"
13 3/8"
96/81,
6 1/2"
RDYaJx &ll xI L
c/L MELI Cll NGE $ELL YIEIaEa ro THE aDWWa IKfItlYBOx
_ D -3-J/9'
Wli'R Ch 1RWI£ IxMi/&£ RO�[A 4µ 'RLLL
. C,. BELL xVRE:
la' DN IPPfR. 19' CN LGYnt
5/r Nl l` 1 I (Dh Cf EJ
1J s/r w B -D G rww'E
1a• auPER sEu-o-GRw
0 G) Y BM $ID. 0mv
—_ MW LM BOwx n.v1O[
40ii HTIAL u® PRCVRE*nal x0110E
I�xs e.swnww �.,w NMeew�A� „.
ra.n a wir I
�x®p Pov I�neem. r< w n'..na'oxo ,am�
n� a Brix ssb n Pe me.ma. xa � .
>a�. ne a mW ieem�
IS -5/B" w SIV3IER w
13-S/Y 5x Mwo w
,Ys/a' w Fw o wnwx
I E ROP.
I3 S/a' w GUERM C. IYRE V IiIiw BOP
IJ 5/6' w R1INGED roP
13 5/B' w EWIGFO WITW
'SBR' & S1 RADS v ARE BdNEil
T I gyS(ER, W R GV
13 5/a- w anwoEB iDP
13 5/9' sx 9W BDnou
M (E) 3 1/B' w som d1iLL15
aLL LW -
2 ;/Id' w 1= nOY
E-1/16' w x J -1/B' w DSA
3-i/a' w
w F M WNGL GR WLK
W1fdp M➢RWya GlE V.LL12
4 $PM1R SPoDt
IS 5/a' w iWN{
WT BDP
13 5/B' w CU41Nx C. 1 v S.Gtf BOP
1J 5/B' w PLNKED iDP
13 s/a' w gN6B➢ BDIIpL
o :h
K nE )SM WD
KWX 13 5/1' w RoP
i16Gx-w uro0i
TDP
u s/e' w MNcfo wnau
CXttE {Wf
s-I/a' w fLWGED 4VYYL G2 vN.VC
sPMER sPN' l
3-i/e- w xwrrn .mRrir,c cvE vrrc
''-R' 13 s/e w MxGE rw
}I/a' w nEx xosE
1J s/a' w rvNcm Blirou
owaE S'IWTD INPIER
35X w MxGFO iOP
11' w ILWDED MITI.
cf1LR ,VVN) Mu lRAD CoxiGUMigx
INE RFSEA£NCE a IAE
ASSEY&r
II'
Nm
EEiENEEM w OPEWidYs
Im
W F
II' w P D
REgRREMfXia
w I
11' Mxuo Weonau
Cxa5G xGD r
ED TE
II' w lW1DfD CP
40ii HTIAL u® PRCVRE*nal x0110E
I�xs e.swnww �.,w NMeew�A� „.
ra.n a wir I
�x®p Pov I�neem. r< w n'..na'oxo ,am�
n� a Brix ssb n Pe me.ma. xa � .
>a�. ne a mW ieem�
IS -5/B" w SIV3IER w
13-S/Y 5x Mwo w
,Ys/a' w Fw o wnwx
I E ROP.
I3 S/a' w GUERM C. IYRE V IiIiw BOP
IJ 5/6' w R1INGED roP
13 5/B' w EWIGFO WITW
'SBR' & S1 RADS v ARE BdNEil
T I gyS(ER, W R GV
13 5/a- w anwoEB iDP
13 5/9' sx 9W BDnou
M (E) 3 1/B' w som d1iLL15
aLL LW -
2 ;/Id' w 1= nOY
E-1/16' w x J -1/B' w DSA
3-i/a' w
w F M WNGL GR WLK
W1fdp M➢RWya GlE V.LL12
4 $PM1R SPoDt
IS 5/a' w iWN{
WT BDP
13 5/B' w CU41Nx C. 1 v S.Gtf BOP
1J 5/B' w PLNKED iDP
13 s/a' w gN6B➢ BDIIpL
o :h
K nE )SM WD
KWX 13 5/1' w RoP
i16Gx-w uro0i
4%0.1
Z bp
North America - ALASKA - BP
Prudhoe Bay
PB J Pad
J-28
J -28A
Plan: J -28A wp07A
BP Well Plan Survey Report
08 May,2017
FI
BAKER
HUGHES
P
Company: North America - ALASKA - BP
Project: Prudhoe Bay
Site: PB J Pad
Well: J-28
Wellbore: J-2aA
Design: J -28A WP07A
BP
PB J Pad, TR -11-13
I/.FA9
BP Well Plan Survey Report
BAKER
-- - ---
Site Position:
HUGHES
Local Co-ordinate Reference:
Well J-28
5,968,224.220 usft
TVD Reference:
J -28A Planning @ 86.66usft (ngx)
From:
MD Reference:
J -28A Planning @ 86.66usft (rigx)
North Reference:
True
148° 51'20.092 W
Survey Calculation Method:
Minimum Curvature
Slot Radius:
Database:
EDM R5K- Alaska PROD - ANCP1
Grid Convergence:
Project Prudhoe Bay, GPB, PRUDHOE BAY
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Pam
Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734`1586, ' Using geodetic scale factor
Site
PB J Pad, TR -11-13
_-
--
-- - ---
Site Position:
Northing:
5,968,224.220 usft
Latitude:
70° 19' 14.845 N
From:
Map
Easting:
641,155.790 usft
Longitude:
148° 51'20.092 W
Position Uncertainty:
0.00 usft
Slot Radius:
0.000 in
Grid Convergence:
1.08 °
Well
J-28, J-28
Well Position
+N/ -S 0.00 usft
Northing:
5,970,537.000 usft
Latitude:
70° 19'37.316 N
+EI -W 0.00 Usti
Easting:
642,621.000 usft
Longitude:
148° 50'36.055 W
Position Uncertainty
0.00 usft
Wellhead Elevation:
39.52 us%
Ground Level:
39.51 usft
Wellbore
J -28A
Magnetics
Model Name Sample Date
Declination
Dip Angle Field Strength
(°)
PI
hT)
BGGM2016 7/1/2017
17.78
81.01
57,551
Design
J -28A wp07A
Audit Notes:
Version:
Phase:
PLAN
Tie On Depth: 2,909 55
Vertical Section:
Depth From (TVD)
+N/ -S
+EI -W
Direction
(usft)
(usft)
(usft)
(^)
47.14
0.00
000
276.27
5/8/2011 9'30054m,
Page 2
COMPASS 5000.7 Build 81B
440
J!" by
BP
BP Well Plan Survey Report
Company: North America -ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project: Prudhoe Bay
TVD Reference:
J -28A Planning @ 86.66usft (rigx)
Site: PB J Pad
MD Reference:
J -28A Planning @ 86.66usft (rigx)
Well: J-28
North Reference:
True
Wellbore: J-2aA
Survey Calculation Method:
Minimum Curvature
Design: J -28A wp07A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey Tool Program
Date 618/2017
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
109.55
2,909.55 J-28 Srvy 1 BOSS -MS (J-28PB1)
BOSS -GYRO
Sperry -Sun BOSS gyro multishot
2,909.55
2,955.00 J-28Awp07A (J-2aA)
BOSS -GYRO
Sperry -Sun BOSS gyro multishot
2,955.00
3,800.00 J -28A wp07A(J-28A)
BLIND
Blind drilling
2,955.00
3,800.00 J -28A wp07A (J -28A)
GYD-BM-MS
Gymclata - badmem drop Ms
3,800.00
11,541.00 J -28A wp07A(J-28A)
MWD
MWD - Standard
3,800.00
11,541.00 J -28A wp07A(J-28A)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
11,541.00
17,538.76 J -28A wp07A(J-28A)
MWD
MWD -Standard
11,541.00
17,53876 J -28A wp07A(J-28A)
MWD+IFR+MS-WOCA
MWD+ IFR+ Multi Station W/O Crustal
Planned Survey
--
-
MD
Inc Azi(azimuth)
TVD
TVDSS
NIS EIW
Northing
Easting
DI-ag
(usft)
(°) (°)
(usft)
(usft)
(usft) (usft)
(usft)
(usft)
(°1100usR)
2,909.55
5.07 298.70
2,909.11
2,822.45
8.46 .10.01
5,970,545.266
642,610.836
0.00
TIP
2,955.00
5.85 300.08
2,954.35
2,867.69
10.58 -13.77
5,970,547.319
642,607.030
1.74
KOP . 9 618"
2,971.00
6.18 318.99
2,970.27
2,883.61
11.64 -15.04
5,970,548.354
642,605.739
12.50
Start 20.00 hold
at 2971.00 MD
2,991.00
6.18 318.99
2,990.15
2,903.49
13.27 -16.46
5,970,549.951
642,604.296
0.00
Start DLS 4.00 TFO 25.00
3,000.00
6.51 320.33
2,999.10
2,912.44
14.03 -17.10
5,970,550.697
642,603.638
4.00
3,100.00
10.30 329.35
3,098.01
3,011.35
26.08 -25.28
5,970,562.596
642,595.232
4.00
3,152.68
12.35 331.85
3,149.66
3,063.00
35.10 -30.34
5,970,571.516
642,590.004
4.00
SV3
3,191.00
13.85 333.22
3,186.98
3,100.32
42.81 -34.34
5,970,579.146
642,585.858
4.00
Start DLS 4.00 TFO 60.00
3,200.00
14.03 334.50
3,195.72
3,109.06
44.76 -35.29
5,970,581.074
642,584.857
4.00
3,295.25
16.33 346.16
3,287.66
3,201.00
68.19 -03.47
5,970,604.346
642,578.246
4.00
SV2
3,300.00
16.46 346.65
3,292.22
3,205.56
69.49 -43.78
5,970,605.643
642,575.906
4.00
BAKER
R•■
HUGHES
TFace
)
0.00
10.24
90.00
0.00
25.00
23.67
14.75
12.29
60.00
58.75
47.50
5/&2017 9:30:05AM Page 3 COMPASS 5000.1 Build 818
1..., b
Z p
mloo4k
Company: North America - ALASKA - BP
Project: Prudhoe Bay
Site: PB J Pad
Well: J-28
Wellbore: J -28A
Design: J-28Awp07A
Planned Survey
MD
Inc
(usft)
(°(
3,400.00
19.40
3,500.00
22.66
3,600.00
26.12
3,691.00
29.37
Start DLS 5.00 TFO
26.66
3,700.00
29.78
3,713.32
30.37
SV1
3,387.37
3,800.00
34.32
3,900.00
38.97
4,000.00
43.68
4,100.00
48.44
4,200.00
53.24
4,267.74
56,50
UG4
642,569.430
4,300.00
58.06
4,333.97
59.70
UG4A
176.79
4,400.00
62.89
4,488.29
67.18
Start 3201.44 hold at 4488.29 MD
4,500.00
87.18
4,600.00
67.18
4,700.00
67,18
4,800.00
67.18
4,900.00
67.18
4,929.21
67.18
UG3
-38.48
BP
BP Well Plan Survey Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well J-28
J -28A Planning @ 86.66usft (rigx)
J -28A Planning @ 86.66usft (ngx)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
BAKERAN
HUGHES
Azi (azimuth(
TVD
TVDSS
NIS
ENV
Northing
Easting
BUS
TFace
(°)
(usft)
(usft(
(usft(
(usft)
(usft)
(usft)
(°I100usH)
(°)
355.49
3,387.37
3,300.71
99.85
-48.36
5,970,635.903
642,570.752
4.00
47.02
1.98
3,480.71
3,394.05
135.67
-49.00
5,970,671.706
642,569.430
4.00
38.61
6.87
3,571.78
3,485.12
176.79
-45.71
5,970,712.878
642,571.946
4.00
32.55
10.36
3,652.31
3,565.65
218.64
-39.29
5,970,754.841
642,577.562
4.00
28.09
10.77
3,660.14
3,573.48
223.01
-38.48
5,970,759.222
642,578.294
5.00
26.66
11.35
3,671.66
3,585.00
229.56
-37.20
5,970,765.794
642,579.449
5.00
26.30
14.70
3,744.88
3,658.22
274.71
-26.68
5,970,811.130
642,589.109
5.00
25.80
17.80
3,825.10
3,738.44
331.96
-9.90
5,970,868.682
642,604.792
5.00
22.97
20.33
3,900.18
3,813.52
394.32
11.72
5,970,931.440
642,625.224
5.00
20.48
22.46
3,969.55
3,882.89
461.32
38.03
5,970,998.926
642,650.249
5.00
18.58
24.29
4,032.68
3,946.02
532.46
68.81
5,971,070.626
642,679.676
5.00
17.10
25.40
4,071.68
3,985.00
582.71
92.10
5,971,121.313
642,701.998
5.00
15.94
25.91
4,089.10
4,002.44
607.18
103.85
5,971,145.996
642,713.282
5.00
15.30
26.42
4,106.66
4,020.00
633.28
116.67
5,971,172.337
642,725.606
5.00
15.03
27.36
4,138.37
4,051.71
684.92
142.87
5,971,224.461
642,750.810
5.00
14.77
28.54
4,175.62
4,088.96
755.60
180.39
5,971,295.834
642,786.977
5.00
14.31
28.54
4,180.17
4,093.51
765.08
185.54
5,971,305.411
642,791.953
0.00
0.001
28.54
4,218.96
4,132.30
848.05
229.58
5,971,387.195
642,834.444
0.00
0.00
28.54
4,257.75
4,171.09
927.02
273.62
5,971,468.979
642,876.934
0.00
0.00
28.54
4,296.54
4,209.88
1,007.98
317.67
5,971,550.762
642,919.424
0.00
0.00
28.54
4,335.33
4,248.67
1,088.95
361.71
5,971,632.546
642,961.915
0.00
0.00
28.54
4,346.66
4,260.00
1,112.61
374.57
5,971,656.438
642,974.328
0.00
0.00
SW2017 9: 30.05AM Page 4 COMPASS 5000.1 Build 819
RNs b
BP
EARN
Z- p
'N
BP Well
Plan Survey Report
BAKER
r2
HUGHES
Company: North America
- ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project: Prudhoe Bay
TVD Reference:
J -28A Planning @ 86.66usft (dgx)
Site: PB J Pad
MD Reference:
J -28A Planning @ 86.66usft (rigx)
Welt: J-28
North Reference:
True
Wellbore: J -28A
Survey Calculation Method:
Minimum Curvature
Design: J -28A wp07A
Database:
EDM RSK- Alaska PROD -ANCP1
Planned Survey
MD Inc
AN (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easgng
DLeg
TFace
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
(°)
5,000.00
67.18
28.54
4,374.12
4,287.46
1,169.92
405.75
5,971,714.330
643,004.405
0.00
0.00
5,100.00
67.16
28.54
4,412.91
4,326.25
1,250.89
449.79
5,971,796.113
643,046.896
0.00
0.00
5,200.00
67.18
28.54
4,451.70
4,365.04
1,331.85
493.83
5,971,877.897
643,089.386
0.00
0.00
5,300.00
67.18
28.54
4,490.49
4,403.83
1,412.82
537.87
5,971,959.681
643,131.877
000
0.00
5,400.00
67.18
28.54
4,529.28
4,442.62
1,493.79
561.91
5,972,041.465
643,174.367
0.00
0.00
5,500.00
67.18
28.54
4,568.07
4,481.41
1,574.76
625.95
5,972,123.248
643,216.857
0.00
0.00
5,600.00
67.18
28.54
4,606.86
4,520.20
1,655.72
669.99
5,972,205.032
643,259.348
0.00
0.00
5,700.00
67.16
28.54
4,645.65
4,558.99
1,736.69
714.03
5,972,286.816
643,301.838
0.00
0.00
5,800.00
67.18
28.54
4,684.44
4,597.78
1,817.66
758.07
5,972,368.599
643,344.329
0.00
0.00
5,900.00
67.18
28.54
4,723.23
4,636.57
1,898.63
802.11
5,972,450.383
643,386.819
0.00
0.00
6,000.00
67.18
28.54
4,762.02
4,675.36
1,979.59
846.15
5,972,532.167
643,429.309
0.00
0,00
6,100.00
67.18
28.54
4,800.81
4,714.15
2,060.56
890.19
5,972,613.950
643,471.800
0.00
0.00
6,200.00
67.18
28.54
4,839.60
4,752.94
2,141.53
934.24
5,972,695.734
643,514.290
0.00
0.00
6,300.00
67.18
28.54
4,878.39
4,791.73
2,222.50
978.28
5,972,777.518
643,556.781
0.00
0.00
6,400.00
67.18
28.54
4,917.18
4,830.52
2,303.46
1,022.32
5,972,859.301
643,599.271
0.00
0.00
6,500.00
67.18
28.54
4,955.97
4,869.31
2,384.43
1,066.36
5,972,941.085
643,641.762
0.00
0.00
6,600.00
67.18
28.54
4,994.76
4,908.10
2,465.40
1,110.40
5,973,022.869
643,684.252
0.00
000
6,700.00
67.18
28.54
5,033.55
4,946.89
2,546.37
1,154.44
5,973,104.652
643,726.742
0.00
0.00
6,800.00
67.18
28.54
5,072.34
4,985.68
2,627.33
1,198.48
5,973,186.436
643,769.233
0.00
0.00
6,811.13
67.18
28.54
5,076.66
4,990.00
2,636.34
1,203.38
5,973,195.537
643,773.961
0.00
0.001
UGI
6,900.00
67.18
28.54
5,111.13
5,024.47
2,708.30
1,242.52
5,973,268.220
643,811.723
0.00
0.00
7,000.00
67.18
28.54
5,149.92
5,063.26
2,789.27
1,286.56
5,973,350.004
643,854.214
0.00
0.00
7,100.00
67.18
28.54
5,188.71
5,102.05
2,870.24
1,330.60
5,973,431.787
643,896.704
0.00
0.00
7,200.00
67.18
28.54
5,227.50
5,140.84
2,951.20
1,374.84
5,973,513.571
643,939.194
0.00
0.00
7,300.00
67.18
28.54
5,266.29
5,179.63
3,032.17
1,418.66
5,973,595.355
643,981.685
0.00
0.00
7,400.00
67.18
28.54
5,305.09
5,218.43
3,113.14
1,462.72
5,973,677.138
644,024.175
0.00
0.00
WW2017 9:30:05AM
Page 5
COMPASS 5000.1 Build 818
1►44% by eP Fibs
•NNS• BP Well Plan Survey Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well J-28
Project:
Prudhoe Bay
TVD Reference:
J -26A Planning @ 86.66usft (ngx)
Site:
PB J Pad
MD Reference:
J -28A Planning @ 86.66usft (ngx)
Well:
J-28
North Reference:
True
Wellbore:
J -28A
Survey Calcutation Method:
Minimum Curvature
Design:
J-28Awp07A
Database:
EDM RSK- Alaska PROD -ANCP1
Planned Survey
MD
Inc
AN(nimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
TPace
(usft)
1'1
1'I
(usft)
(usft)
(usft)
(usft)
(usrt)
(usft)
(°1100usft)
1°I
7,500.00
67.18
28.54
5,343.88
5,257.22
3,194.11
1,506.76
5,973,758.922
644,066.666
0.00
0.00
7,600.00
87.18
28.54
5,382.67
5,296.01
3,275.07
1,550.81
5,973,840.706
644,109.156
0.00
0.00
7,661.86
67.18
28.54
5,406.66
5,320.00
3,325.16
1,578.05
5,973,891.294
644,135.439
0.00
0.00
WS2
1 7,689.73
67.18
28.54
5,417.47
5,330.81
3,347.72
1,590.32
5,973,914.089
644,147.282
0.00
0.00
Start DLS 5.00 TFO
-164.82
7,700.00
66.68
28.40
5,421.50
5,334.84
3,356.03
1,594.83
5,973,922.479
644,151.628
5.00
-164.82
7,800.00
61.88
26.91
5,464.90
5,378.24
3,435.79
1,636.64
5,974,003.013
644,191.918
5.00
-164.76
7,900.00
57.06
25.28
5,515.69
5,429.03
3,513.10
1,674.54
5,974,081.025
644,228.337
5.00
-164.12
8,000.00
52.29
23.46
5,573.50
5,486.84
3,587.38
1,708.23
5,974,155.922
644,260.609
5.00
-163.29
8,024.46
51.12
22.99
5,568.66
5,502.00
3,605.02
1,715.81
5,974,173.705
644,267.844
5.00
-162.24
WS1
8,100.00
47.54
21.40
5,637.88
5,551.22
3,658.05
1,737.46
5,974,227.134
644,288.486
5.00
-161.94
8,200.00
42.84
19.00
5,708.33
5,621.67
3,724.59
1,762.01
5,974,294.119
644,311.758
5.00
-160.91
8,300.00
38.20
16.13
5,784.34
5,697.68
3,786.48
1,761.68
5,974,358.368
644,330.247
5.00
-159.21
8,316.87
37.43
15.59
5,797.66
5,711.00
3,796.43
1,784.50
5,974,366.366
644,332.884
5.00
-157.03
CM3
8,400.00
33.65
12.61
5,865.30
5,778.64
3,843.25
1,796.32
5,974,413.406
644,343.813
5.00
-156.60
8,500.00
29.22
8.15
5,950.62
5,863.96
3,894.48
1,805.84
5,974,464.800
644,352.351
5.00
-154.18
8,525.12
28.13
6.83
5,972.66
5,886.00
3,906.43
1,807.41
5,974,476.776
644,353.698
5.00
-150.37
CM2
8,600.00
24.98
2.29
6,039.64
5,952.98
3,939.77
1,810.15
5,974,510.158
644,355.798
5.00
-149.22
8,700.00
21.08
354.33
6,131.68
6,045.02
3,978.77
1,809.22
5,974,549.135
644,354.126
5.00
-145.15
8,800.00
17.66
343.21
6,22604
6,139.38
4,011.20
1,803.05
5,974,581.435
644,347.349
5.00
-137.82
8,900.00
15.15
327.82
6,322.01
6,235.35
4,036.80
1,791.71
5,974,606.811
644,335.519
5.00
-127.32
9,000.00
13.99
308.38
6,418.85
6,332.19
4,055.37
1,775.26
5,974,625.071
644,318.724
5.00
-112.55
9,100.00
14.53
288.11
6,515.83
6,429.17
4,066.79
1753.84
5,974,636.076
644,297.094
5.00
-93.72
9,200.00
16.60
271.05
6,612.20
6,525.54
4,070.95
1,727.61
5,974,639.741
644,270.793
5.00
-74.06
SW017 9:30054M
Page 6
COMPASS
5000.1 Build 816
bp
BP
•■
y��=
BP Well
Plan Survey Report
BAKER
HUGHES
Company: North America -ALASKA - BP
Project: Prudhoe BaySite
Local Co-ordinate Reference:
Well J-28
PB J Pad
TVD Reference:
J -28A Planning @ 86.66usft (rigx)
Well
Well: J-28
MD Reference:
J -28A Planning @ 86.66usft (rigx)
Wellbore: J -28A
North Reference:
True
Design: J -28A wp07A
Survey Calculation Method:
Minimum Curvature
Database:
EDM RSK- Alaska PROD -ANCPI
Planned Survey
-
MD Inc
(usft) (°)
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Fasting
DLsg
TFace
(°I
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(°)
9,300.00
19.73
256.46
6,707.24
6,620.58
4,067.84
1,696.77
5,974,636.039
644,240.020
5.00
-57.62
9,328.15
20.73
255.61
6,733.66
6,647.00
4,065.65
1,687.29
5,974,633.670
644,230.581
5.00
-45.64
CM1
9,400.00
23.48
249.46
6,800.23
6,713.57
4,057.46
1,661.56
5,974,624.999
644,205.010
5.00
42.97
9,500.00
27.62
242.92
6,690.44
6,803.78
4,039.91
1,622.23
5,974,606.703
644,166.030
5.00
-37.27
9,600.00
31.99
238.01
6,977.21
6,890.55
4,015.31
1,579.10
5,974,581.292
644,123.376
5.00
-31.37
9,600.28
32.00
238.00
6,977.45
6,890.79
4,015.23
1,578.98
5,974,581.211
644,123.251
5.00
-27.10
Start 1940.00 hold at 9600.26 MD
9,700.00
32.00
238.00
7,062.01
6,975.35
3,987.23
1,534.16
5,974,552.364
644,078.981
0.00
0.00
9,712.55
32.00
238.00
7,072.66
6,986.00
3,983.71
1,528.52
5,974,548.732
644,073.408
0.00
TNRZ
0.00
9,800.00
32.00
238.00
7,146.82
7,060.16
3,959.15
1,489.22
5,974,523.435
644,034.587
0.00
0.00
9,900.00
32.00
238.00
7,231.62
7,144.96
3,931.07
1,444.28
5,974,494.507
643,990.193
0.00
9,942.49
32.00
238.00
7,267.66
7,181.00
3,919.13
1,425.19
5,974,482.214
643,971.328
0.00
0.00
0.00
LCUITMLV
10,000.00
32.00
238.00
7,316.43
7,229.77
3,902.99
1,399.34
5,974,465.578
643,945.798
0.00
0.00
10,063.95
32.00
238.00
7,370.66
7,284.00
3,885.03
1,370.60
5,974,447.079
643,917.408
0.00
TKNG
0.00
10,100.00
32.00
238.00
7,401.23
7,314.57
3,874.90
1,354.40
5,974,436.650
643,901.404
0.00
0.00
10,200.00
32.00
238.00
7,486.04
7,399.38
3,846.82
1,309.46
5,974,407.722
643,857.010
0.00
0.00
10,300.00
32.00
238.00
7,570.84
7,484.18
3,818.74
1,264.52
5,974,378.793
643,812.815
0.00
0.00
10,400.00
32.00
238.00
7,655.65
7,568.99
3,790.66
1,219.58
5,974,349.865
643,768.221
0.00
0.00
10,434.21
32.00
238.00
7,684.66
7,598.00
3,781.05
1,204.21
5,974,339.968
643,753.033
0.00
0.00
TJF
10,500.00
32.00
238.00
7,740.45
7,653.79
3,762.58
1,174.64
5,974,320.936
643,723.826
0.00
0.00
10,600.00
32.00
238.00
7,825.26
7,738.60
3,734.50
1,129.70
5,974,292.006
643,679.432
0.00
0.00
10,640.57
32.00
238.00
7,859.66
7,773.00
3,723.11
1,111.47
5,974,280.272
643,661.422
0.00
0.00
TJE
5/82017 930:05AM
Page 7
COMPASS 5000.1 Build 81B
byS"H4e
Local Co-ordinate
Reference:
Well J-28
Company: North America - ALASKA - BP
Project: Prudhoe Bay
Site: PB J Pad
J -28A Planning Q
Well: J-28
Wellbore: J -28A
MD Reference:
Design: J -28A wp07A
J -28A Planning @
86.66usft (rigx)
Planned Survey
MD Inc
Azi (azimuth)
(usft) 1'1
(°)
10,700.00
32.00
238.00
10,800.00
32.00
238.00
10,888.20
32.00
238.00
TJD
Database:
10,900.00
32.00
238.00
11,000.00
32.00
238.00
11,100.00
32.00
238.00
11,200.00
32.00
238.00
11,221.90
32.00
238.00
Tic
(usft)
(°I700uift)
11,300.00
32.00
238.00
11,351.61
32.00
238.00
TJB
0.00
0.00
11,400.00
32.00
238.00
11,440.05
32.00
238.00
TJA
0.00
8,069.66
11,500.00
32.00
238.00
11,540,28
32.00
238.00
Start 20.00 hold at 11540.28
MD - TSGR - 7-
7,993.01
11,56028
32.00
238.00
Start Build 8.00
0.00
0.00
11,581.76
33.72
238.00
TSHU
5,974,176.295
643,501.854
11,600.00
35.18
238.00
11,684.39
41.93
238.00
Start Build 12.00
643,457.460
0.00
11,687.08
42.25
236.00
TSAD
860.07
5,974,118.438
11,700.00
43.80
238.00
5/8/2017 9:30054M
BP FIND
BP Well Plan Survey Report BAKER
HUGHES
Local Co-ordinate
Reference:
Well J-28
TVD Reference:
J -28A Planning Q
86.66usft (rigx)
MD Reference:
J -28A Planning @
86.66usft (rigx)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM RSK- Alaska
PROD -ANCP1
TVD
TVDSS
NIS
PJW
Northing
Easting
OL99
TFace
(usft)
(usft)
(usft'
Net
(usft)
(usft)
(°I700uift)
(°)
7,910.06
7,82340
3,706.42
1,084.77
5,974,263.080
643,635.038
0.00
0.00
7,994.87
7,908.21
3,678.33
1,039.83
5,974,234.151
643,590.643
0.00
0.00
8,069.66
7,983.00
3,653.57
1,000.19
5,974,208.638
643,551.489
0.00
0.00
8,079.67
7,993.01
3,650.25
994.89
5,974,205.223
643,546.249
0.00
0.00
8,164.46
8,077.82
3,622.17
949.95
5,974,176.295
643,501.854
0.00
0.00
8,249.28
8,162.62
3,594.09
905.01
5,974,147.368
643,457.460
0.00
0,00
8,334.09
8,247.43
3,566.01
860.07
5,974,118.438
643,413.066
0.00
0.00
6,352.66
8,266.00
3,559.86
850.22
5,974,112.102
643,403.342
0.00
0.00
8,418.89
8,332.23
3,537.93
815.13
5,974,089.509
643,368.671
0.00
0.00
8,462.66
8,376.00
3,523.43
791.93
5,974,074.579
643,345.758
0.00
0.00
8,503.69
8,417.03
3,509.85
770.19
5,974,060.581
643,324.277
0.00
0.00
8,537.66
8,451.00
3,498.60
752.19
5,974,048.995
643,306.497
0.00
0.00
8,588.50
8,501.84
3,481.76
725.25
5,974,031.653
643,279.883
0.00
0.00
8,622.66
8,536.00
3,470.45
707.15
5,974,020.000
643,262.000
0.00
0.00
8,639.62
8,552.96
3,464.84
698.16
5,974,014.214
643,253.121
0.00
0.00
8,657.66
8,571.00
3,458.66
688.28
5,974,007.854
643,243.360
8.00
0.00
8,672.70
8,586.04
3,453.19
679.52
5,974,002.220
643,234.715
8.00
0.00
8,738.66
8,652.00
3,425.34
634.95
5,973,973.526
643,190.679
8.00
0.00
8,740.66
8,654.00
3,424.38
633.42
5,973,972.540
643,189.168
12.00
0.00
8,750.10
8,663.44
3,419.71
625.94
5,973,967.728
643,181.782
12.00
0.00
Page 8
COMPASS
5000.1 Build 81B
�,►4ti. BP I/Fag
yow BP Well Plan Survey Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB J Pad
Well:
J-28
Wellbore:
J -28A
Design:
J-28Awp07A
Planned Survey
MD Inc
TVD
(usft) (°)
NIS
11,800.00
55.80
11,900.00
67.80
12,000.00
79.80
12,100.00
91.80
12,200.00
103.80
12,266 39
111.77
Start 340.00 hold at 12266.39 MD
12,300.00
111.77
12,400.00
111.77
12,500.00
11177
12,600.00
111.77
12,606.39
111.77
Start DLS 6.00 TFO -157.06
12,700.00
106.58
12,800.00
101.01
12,900,00
95.43
12,988.94
90.46
Start 453.62 hold at 12988.94 MD
13,000.00
90.46
13,100.00
90.46
13,200.00
90.46
13,300.00
90.46
13,400.00
90.46
13,442.56
90.46
Start DLS 6.00 TFO 97.95
8,796.63
13,497.54
90.00
Start 100.00 hold at 13497.54 MD
13,500.00
90.00
5812017 9:30.05AM
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well J-28
J -28A Planning @ 86.66usft (dgx)
J -28A Planning @ 86.66usft (rigx)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Azi(azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
P)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
238.00
8,814.53
8,727.87
3,379.31
561.29
5,973,926.108
643,117.910
12.00
238.00
8,861.69
8,775.03
3,332.69
486.68
5,973,878.084
643,044.212
12.00
238.00
8,889.54
8,802.88
3,281.90
405.39
5,973,825.757
642,963.908
12.00
238.00
8,696.84
8,810.18
3,229.14
320.97
5,973,771.413
642,680.510
12.00
238.00
8,883.29
8,796.63
3,176.74
237.10
5,973,717.427
642,797.661
12.00
238.00
8,863.03
8,776.37
3,143.27
183.54
5,973,682.945
642,744.745
12.00
238.00
8,850.57
8,763.91
3,126.72
157.06
5,973,665.905
642,718.594
0.00
238.00
8,813.48
8,726.82
3,077.51
78.31
5,973,615.207
642,640.793
0.00
238.00
8,776.40
8,689.74
3,028.30
-0.45
5,973,564,510
642,562.991
0.00
238.00
8,739.31
8,652.65
2,979.09
-79.21
5,973,513.813
642,485.189
0.00
238.00
8,736.94
8,850.28
2,975.94
-84.24
5,973,510.574
642,480.219
0.00
235.72
8,706.20
8,619.54
2,927.60
-158.23
5,973,460.840
642,407.168
6.00
233.41
8,682.36
8,595.70
2,871.31
-237.30
5,973,403.055
642,329.182
6.00
231.19
8,668.06
8,581.40
2,810.80
-315.57
5,973,341.082
642,252.083
6.00
229.26
8,663.49
8,576.83
2,753.99
-383.81
5,973,282.990
642,184.939
8.00
229.26
8,663.41
8,576.75
2,746.78
-392.19
5,973,275.616
642,176.700
0.00
229.26
8,662.61
8,575.95
2,681.51
467.95
5,973,208.928
642,102.199
0.00
22926
8,661.81
8,575.15
2,616.25
-543.72
5,973,142.239
642,027.697
0.00
229.26
8,661.02
8,574.36
2,550.98
-619.48
5,973,075.551
641,953.196
0.00
229,26
8,660.22
8,573.56
2,485.72
-695.24
5,973,008.862
641,878.694
0.00
229.26
8,659.88
8,573.22
2,457.94
-727.48
5,972,980.482
641,846.988
0.00
232.52
8,659.66
8,573.00
2,423.26
-770.14
5,972,945.000
641,805,000
8.00
TFace
0.00
0.00
0.00
0.00
000
000
0.00
0.00
0.00
0.00
0.00
-157.06
-157.81
-158.38
-158.68
0.00
0.00
0.00
0.00
0.00
0.00
97.95
232.52 8,659.66 8,573.00 2,421.77 -772.09 5,972,943.468 641,803.078 0.00 0.00
Page 9 COMPASS 5000.1 Build BIB
-,N.ti b BP
Sy04�: p BP Well Plan Survey Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB J Pad
Well:
J-28
Wellbore:
J -28A
Design:
J -28A wp07A
Planned Survey
MD
Inc
(usft)
I°1
13,597.54
90.00
Start DLS 3.00 TFO.99.18
13,600.00
89.99
13,700.00
89.51
13,800.00
89.03
13,900.00
88.56
14,000.00
88.09
14,100.00
87.62
14,152.70
87.38
Start 311.11 hold at
14152.70 MD
14,200.00
87.38
14,300.00
87.38
14,400.00
67.38
14,463.81
87.38
Start DLS 5.50 TFO
81.32
14,500.00
87.68
14,600.00
88.53
14,700.00
89.39
14,800.00
90.26
14,900.00
91.12
15,000.00
91.98
15,100.00
92.81
15,118.55
92.96
Start 347.49 hold at
15118.55 MD
15,200.00
92.96
15,300.00
92.96
15,400.00
92.96
Local Coordinate Reference:
Well J-28
ND Reference:
J -28A Planning @ 86.66usft (rigx)
MD Reference:
J -28A Planning @ 86.66usft (rigx)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
AN (azimuth)
ND
TVDSS
NIS
EItN
Northing
Easgng
DLeg
1°)
lust)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
232.52
8,659.66
8,573.00
2,362.42
-649.50
5,972,882.664
641,726.816
0.00
232.45
8,659.66
8,573.00
2,360.92
-851.45
5,972,881.131
641,724.895
3.00
229.49
8,660.10
8,573.44
2,297.96
-929.12
5,972,816.706
641,648.440
3.00
226.53
8,661.37
8,574.71
2,231.07
-1,003.43
5,972,748.422
641,575.420
3.00
223.56
8,663.47
8,576.81
2,160.44
-1,074.18
5,972,676.465
641,506.037
3.00
220.60
8,666.40
8,579.74
2,086.26
-1,141.16
5,972,601.034
641,440.481
3.00
217.63
8,670.14
8,583.48
2,008.74
-1,204.20
5,972,522.333
641,378.931
3.00
216.07
8,672.44
8,585.78
1,966.61
-1,235.77
5,972,479.620
641,348.166
3.00
216.07
8,674.60
6,587.94
1,928.42
-1,263.60
5,972,440.905
641,321.076
0.00
216.07
8,679.17
8,592.51
1,847.67
-1,322.41
5,972,359.063
641,263.809
0.00
216.07
81683.74
8,597.08
1,766.93
-1,381.23
5,972,277.222
641,206.541
0.00
216.07
8,686.66
8,600.00
1,715.41
-1,418.76
5,972,225.000
641,170.000
0.00
218.04
8,688.22
8,601.56
1,686.55
-1,440.55
5,972,195.739
641,148.767
5.50
223.48
8,691.53
8,604.87
1,610.88
-1,505.78
5,972,118.844
641,084.994
5.50
228.91
8,693.34
8,606.68
1,541.70
-1,577.91
5,972,048.307
641,014.198
5.50
234.34
8,693.65
8,606.99
1,479.64
-1,656.27
5,971,984.779
640,937.030
5.50
239.77
8,692.45
8,605.79
1,425.29
-1,740.16
5,971,928.844
640,854.201
5.50
245.21
8,689.74
8,603.08
1,379.13
-1,828.78
5,971,681.018
840,766.473
5.50
250.65
6,685.56
8,596.90
1,341.60
-1,921.34
5,971,841.740
640,674.655
5.50
251.66
8,684.63
8,597.97
1,335.62
.1,938.87
5,971,835.425
640,657.242
5.50
251.66
8,680.42
8,593.76
1,310.03
-2,016.08
5,971,808.370
640,580.537
0.00
251.66
8,675.25
8,588.59
1,278.60
-2,110.88
5,971,775.153
640,486.365
0.00
251.66
8,670.08
8,583.42
1,247.18
-2,205.67
5,971,741.937
640,392.193
0.00
TFace
1°)
0.00
-99.18
-99.18
-99.16
-99.13
-99.06
-9898
.98.87
0.00
0.00
0.00
0.00
81.32
81.23
81.05
80.95
80.93
81.00
81.15
3�P1
0.00
0.00
0.00
&&2017 9:30: 05AM Page 10 COMPASS 5000.1 Build 81B
Planned Survey
BP
BP Well Plan Survey Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well J-28
J -28A Planning @ 86.66usft (dgx)
J -28A Planning @ 86.66usft (rigx)
True
Minimum Curvature
EDM R5K- Alaska PROD - ANCP1
FEARS
BAKER
HUGHES
MD
Inc
=
bySAN.`
TVDSS
NIS
Company:
North Amedca- ALASKA -BP
Project:
Prudhoe Bay
Site:
PB J Pad
Well:
J-28
Wellbore:
J -28A
Design:
J -28A WP07A
Planned Survey
BP
BP Well Plan Survey Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well J-28
J -28A Planning @ 86.66usft (dgx)
J -28A Planning @ 86.66usft (rigx)
True
Minimum Curvature
EDM R5K- Alaska PROD - ANCP1
FEARS
BAKER
HUGHES
MD
Inc
Azi(azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DI -eq
TFace
(usft)
1°I
(°)
(usft)
(usft)usft
1 1
lusft)
(usft)
(usft)
(°I100usft)
1°I
15,468.04
92.96
251.66
8,666.66
8,580.00
1,226.43
-2,268.27
5,971,720.000
640,330.000
0.00
0.00
Start Drop .5.00
15,500.00
91.27
251.66
8,665.41
8,578.75
1,215.75
-2,300.48
5,971,708.713
640,298.001
5.00
180.00
15,521.04
90.21
251.66
8,665.13
8,578.47
1,209.13
-2,320.45
5,971,701.715
640,278.161
5.00
180.00
Start DLS 5.00 TFO
83.20
15,600.00
90.68
255.58
8,664.52
8,577.86
1,186.87
-2,396.19
5,971,678.020
640,202.867
5.00
83.20
15,700.00
91.27
260.55
8,662.82
8,576.16
1,166.20
-2,493.98
5,971,855.494
640,105.493
5.00
83.23
15,800.00
91.84
265.52
8,660.10
8,573.44
1,154.07
-2,593.18
5,971,641.486
640,006.556
5.00
83.31
15,900.00
92.41
270.49
8,656.39
8,569.73
1,150.59
-2,693.02
5,971,636.105
639,906.809
5.00
83.45
15,916.02
92.50
271.28
8,655.71
8,569.05
1,150.83
-2,709.02
5,971,636.048
639,890.803
5.00
83.63
Start 203.40 hold at
15916.02 MD
16,000.00
92.50
271.28
8,652.05
8,565.39
1,152.71
-2,792.90
5,971,636.333
639,806.912
0.00
0.00
16,100.00
92.50
271.28
8,647.70
8,561.04
1,154.95
-2,892.78
5,971,636.673
639,707.015
0.00
0.00
16,119.42
92.50
271.28
8,646.85
8,560.19
1,155.39
-2,912.18
5,971,636.739
639,687.610
0.00
0.00
Start DLS 5.00 TFO
41.89
16,200.00
92.36
267.25
8,643.44
8,556.78
1,154.36
-2,992.66
5,971,634.182
639,607.170
5.00
-9189
16,300.00
92.17
262.25
8,639.49
8,552.83
1,145.23
-3,092.13
5,971,623.160
639,507.898
5.00
-92.06
16,400.00
91.96
257.25
8,635.88
8,549.22
1,127.46
-3,190.44
5,971,603.526
639,409.951
5.00
-92.26
16,500.00
91.74
252.26
8,632.65
8,545.99
1,101.19
-3,286.84
5,971,575.429
639,314.075
5.00
-92.44
16,600.00
91.51
247.26
8,629.81
8,543.15
1,088.61
-3,380.60
5,971,539.083
639,221.000
5.00
-92.60
16,645.24
91.40
245.00
8,626.66
8,542.00
1,048.31
.3,421.96
5,971,520.000
639,180.000
5.00
-92.74
Start DLS 4.00 TPO.115.62
18,700.00
90.45
243.03
8,627.77
8,541.11
1,024.32
-3,471.17
5,971,495.083
639,131.258
4.00
-115.62
16,800.00
88.72
239.42
8,628.50
8,541.64
976.19
-3,558.80
5,971,445.299
639,044.566
4.00
-115.66
16,900.00
86.99
235.81
8,632.24
8,545.58
922.68
-3,643.17
5,971,390.197
638,961.235
4.00
-115.63
16,920.15
86.65
235.08
8,633.36
8,546.70
911.27
-3,659.74
5,971,378.471
636,944.884
4.00
-115.50
Start 210.39 hold at 16920.15 MD
17,000.00
86.65
235.08
8,638.03
8,551.37
865.64
-3,725.10
5,971,331.612
638,880.410
0.00
0.00
5WO17 9:30:05AM Page 11 COMPASS 5000.1 Build 818
bp.000%2
Vertical
NIS
Depth
Depth
Easting
Company: North America
- ALASKA - BP
Project: Prudhoe Bay
2,955.00
2,954.35
Site: PB J Pad
11,540.28
8,622.66
Well: J-28
17,538.76
8,640.66
Wellbore: J -28A
808.49
-3,806.95
Design: J -28A wp07A
638,799.663
0.00
Planned Survey
8,645.66
8,559.00
MD Inc
-3,831.95
AN (azimuth)
(usft) (I
0.00
(I
17,100.00
86.65
235.08
17,130.54
86.65
235.08
Start DLS 4.00 TFO -0.25
-0.25
8,647.69
17,200.00
89.43
235.07
17,249.14
91.39
235.06
Start 289.62 hold at 17249.14 MD
8,646.46
17,30000
91.39
235.06
17,400.00
91.39
235.06
17,500.00
91.39
235.06
• 17,538.76
91.39
235.06
TD at 17538.76
Casing Points
Measured
Vertical
NIS
Depth
Depth
Easting
(usft)
(usft)
(usft)
2,955.00
2,954.35
95/8"
11,540.28
8,622.66
7"
17,538.76
8,640.66
41/2"
BP
BP Well Plan Survey Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well J-28
J -28A Planning @ 86.66usft (rigx)
J -28A Planning @ 86.66ush (rigx)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
BAK R ■
•
HUGHES
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
TFace
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(°)
8,643.87
8,557.21
808.49
-3,806.95
5,971,272.925
638,799.663
0.00
000
8,645.66
8,559.00
791.04
-3,831.95
5,971,255.000
638,775.000
0.00
0.00
8,648.04
8,561.38
751.30
-3,888.86
5,971,214.190
638,718.863
4.00
-0.25
8,647.69
8,561.03
723.16
-3,929.14
5,971,185.293
638,679.127
4.00
-0.25
8,646.46
8,559.80
694.04
-3,970.82
5,971,155.387
638,638.011
0.00
0.00
8,644.03
8,557.37
636.78
-4,052.77
5,971,096.588
638,557.171
0.00
0.00
8,641.60
8,554.94
579.53
-4,134.72
5,971,037.788
638,476.330
0.00
0.00
8,640.86
8,554.00
557.34
-4,166.48
5,971,015.000
638,445.000
0.00
0.00
Casing
Hole
Diameter
Diameter
Name (in)
(in)
9.825
12.250
7.000
8.500
4.500
6.125
&W017 9:30:05AM Page 12 COMPASS 5000.1 Build 81B
BP
FIN Fla
by BP
s.,��r Well Plan Survey Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB J Pad
Well;
J-28
Wellbore:
J -28A
Design:
J -28A WP07A
Formations
Measured
Vertical
Depth
Depth
(usft)
(usft)
Name Lithology
9,328.15
6,733.66
CMI
11,351.61
8,462.66
TJB
11,540.28
8,622.66
TSGR
11,221.90
8,352.66
TJC
9,712.55
7,072.66
THRZ
3,152.68
3,149.66
SV3
3,713.32
3,671.66
SVI
6,811.13
5,076.66
UG1
9,942.49
7,267.66
LCUITMLV
10,434.21
7,684.66
TJF
4,333.97
4,106.66
UG4A
10,640.57
7,859.86
TJE
7,661.86
5,406.66
WS2
11,440.05
8,537.66
TJA
3,295.25
3,287.66
SV2
4,267.74
4,071.66
UG4
10,063.95
7,370.66
TKNG
11,687.08
8,740.66
TSAD
10,888.20
8,069.66
TJD
8,024.46
5,588.66
WS1
11,581.76
8,657.66
TSHU
4,929.21
4,346.66
UG3
8,316.87
5,797.66
CM3
8,525.12
5,972.66
CM2
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Dip
Dip Direction
(1) (1)
Well J-28
J -28A Planning @ 86.66usft (rigx)
J -28A Planning @ 86.66usft (ngx)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
5/82017 9:30:05AM Page 13 COMPASS 5000.1 Build 81B
BP FORM
S���S 1" BP Well Plan Survey Report
NI�KiHES
Company:
North America -ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project:
Prudhoe Bay
TVD Reference:
J -28A Planning @ 86.66usR (rigx)
Site:
PB J Pad
MD Reference:
J -28A Planning @ 86.66usft (ngx)
Well:
J-28
North Reference:
True
Wellbore:
J -28A
Survey Calculation Method:
Minimum Curvature
Design:
J -28A wp07A
Database:
EOM RSK- Alaska PROD -ANCP1
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+NI -S
+EI -W
(usft)
(usft)
(usR)
lush)
Comment
2,909.55
2,909.11
8.46
-10.01
TIP
2,955.00
2,954.35
10.58
-13.77
KOP
2,971.00
2,970.27
11.64
-15.04
Start 20.00 hold at 2971.00 MD
2,991.00
2,990.15
13.27
-16.46
Start DLS 4.00 TFO 25.00
3,191.00
3,186.98
42.81
-34.34
Start DLS 4.00 TFO 60.00
3,691,00
3,652.31
218.64
-39.29
Start DLS 5.00 TFO 26.66
4,488.29
4,175.62
755.60
180.39
Start 3201.44 hold at 4488.29 MD
7,689.73
5,417.47
3,347.72
1,590.32
Start DLS 5.00 TFO -164.82
9,600.28
6,977.45
4,015.23
1,578.98
Start 1940.00 hold at 9600.28 MD
11,540.28
8,622.66
3,470.45
707.15
Start 20.00 hold at 11540.28 MD
11,560.28
8,639.62
3,464.84
698.16
Start Build 8.00
11,684.39
8,738.66
3,425.34
634.95
Start Build 12.00
12,266.39
8,863.03
3,143.27
183.54
Start 340.00 hold at 12266.39 MD
12,606.39
8,736.94
2,975.94
-64,24
Start DLS 6.00 TFO -157.08
12,988.94
8,66149
2,753.99
-383.81
Start 453.62 hold at 12988.94 MD
13,442.56
8,659.88
2,457.94
-727.48
Start DLS 6.00 TFO 97.95
13,497.54
8,659.66
2,423.26
-770.14
Start 100.00 hold at 13497.54 MD
13,597.54
8,659.66
2,362.42
-849.50
Start DLS 3.00 TFO-99.18
14,152.70
8,672.44
1,966.61
-1,235.77
Start 311.11 hold at 14152.70 MD
14,463.81
8,686.66
1,715.41
-1,418.76
Start DLS 5.50 TFO 81.32
15,118.55
8,684.63
1,335.62
-1,938.87
Start 347.49 hold at 15118.55 MD
15,466.04
8,666.86
1,226.43
-2,268.27
Start Drop -5.00
15,521.04
8,665.13
1,209.13
-2,320.45
Start DLS 5.00 TFO 83.20
15,916.02
8,655.71
1,150.83
-2,709.02
Start 203.40 hold at 15916.02 MD
16,119.42
8,646.85
1,155.39
-2,912.18
Start DLS 5.00 TFO-91.89
16,645.24
8,628.66
1,048.31
-3,421.96
Start DLS 4.00 TFO -115.62
16,920.15
8,633.36
911.27
-3,659.74
Start 210.39 hold at 16920.15 MD
17,130.54
8,645.66
791.04
-3,631.95
Start DLS 4.00 TFO -0.25
17,249.14
8,647.69
723.16
-3,929.14
Start 289.62 hold at 17249.14 MD
17,538.76
8,640.66
557.34
-4,166.48
TO at 17538.76
5/82017 9.30,05AM Page 14 COMPASS 5000.1 Build 81B
by
North America - ALASKA - BP
Prudhoe Bay
PB J Pad
J-28
J -28A
J -28A wp07A
Anticollision Summary Report
05 May, 2017
ri, k-- 2
BAKER
HUGHES
e'L BP FOA FAI
kli,Wp Anticollision Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB J Pad
Site Error:
O.00usn
Reference Well:
J-28
Well Error:
O.00usft ,
Reference Wellbore
J -28A
Reference Design:
J -28A wp07A
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method;
Output errors are at
Database:
Offset TVD Reference:
Well J-28
J -28A Planning @ 86.66usft (rigx)
J -28A Planning Q 86.66usft (rigx)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
tolerance
J -28A wp07A
filter type:
GLOBAL FILTER APPLIED: All wellpaths within 20d+ 100/1000 of reference
iterpolation Method:
MD Interval 25.00usft Error Model: ISCWSA
kpth Range:
2,855.00 to 17,538.76usft Scan Method: Tray. Cylinder North
;esulls Limited by:
Maximum center -center distance of 1,949.16usft Error Surface: Elliptical Conic
Survey Tool Program
Data 5/4/2017
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
109.55
2,909.55 J-28 Srvy 1 BOSS -MS (J-28PB1)
BOSS -GYRO
Sperry -Sun BOSS gyro muhishot
2,909.55
2,955.00 J -28A wp07A(J-28A)
BOSS -GYRO
Sperry -Sun BOSS gyro multishot
2,955.00
3,800.00 J-28Awp07A(J-28A)
BLIND
Blind drilling
2,955.00
3,800.00 J -28A wp07A (J -28A)
GYD-BM-MS
Gyrodata- baVmem drop Ms
3,800.00
11,541.00 J -28A wp07A(J-28A)
MWD
MWD -Standard
3,800.00
11,541.00 J -28A wp07A(J-28A)
MWD+IFR+MS-WOCA
MWD + IFR +Multi Station W/O Crustal
11,541.00
17,538.76 J-28Awp07A(J-28A)
MWD
MWD -Standard
11,541.00
17,538.76 J -28A wp07A (J -28A)
MWD+IFR+MS-WOCA
MWD + IFR + Muhi Station W/O Crustal
S 2017 4:01:40PM Page 2 of 5 COMPASS 5000 1 Build 81B
W000LBP%
=Anticollision Report
"' p BAKERHUGHES
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well J-28
Project:
Prudhoe Bay
TVD Reference:
J -28A Planning @ 86.66usft (ngx)
Reference Site:
PB J Pad
MD Reference:
J -28A Planning @ 86.66usft (ngx)
Site Error:
0.00usft
North Reference:
True
Reference Well:
J-28
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
J -28A
Database:
EDM RSK- Alaska PROD -ANCP1
Reference Design:
J -28A wp07A
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
PB J Pad
J -01 -J -01-J-01
3,797.96
3,775.00
565.66
155.66
415.24
Pass - Major Risk
J -01 -J -01A -J -01A
3,802.20
3,800.00
566.17
153.90
417.48
Pass - Major Risk
J-01 - J-01 B - J-01 B
3,802.20
3,800.00
566.17
153.90
417.48
Pass - Major Risk
J-01 - J -01B - Plan #7
3,802.20
3,800.00
566.17
154.17
417.22
Pass - Major Risk
J -03 -J -03-J-03
4,122.73
4,175.00
95.34
93.70
21.07
Pass - Major Risk
J-05 - J -05B - J -05B
2,866.66
2,875.00
519.53
35.87
483,68
Pass - Major Risk
J-05 - J -05C - J -05C
2,866.66
2,875.00
519.53
35.87
483.68
Pass - Major Risk
J-05-J-05CL1-J-05CLI
2,866.66
2,875.00
519.53
35.87
483.68
Pass - Major Risk
J-06 - J-06 - J-06
4,760.35
4,775.00
460.59
127.12
366.28
Pass - Major Risk
J -07 -J -07-J-07
10,402.42
9,125.00
410.76
13.14
410.01
Pass-Minorl/50
J-07 - J -07A - J -07A
10,571.25
9,250.00
377.78
7.45
377.13
Pass - Minor l/50 ,
J -08 -J -08A -J -05A
9,277.92
9,050.00
760.08
249.02
511.76
Pass - Major Risk
J-09 - J -09A - J -09A
2,855.00
2,925.00
1,051.97
41.09
1,010.93
Pass - Major Risk
J -11 -J -11-J-11
3,698.18
4,125.00
343.55
19.10
324.60
Pan - Minor l/50
J-11 - J -11A - J-11 A
16,435.59
10,400.00
85.74
17.49
71.15
Pass - Minor l/50
J-11-J-11APB1-J-11APB1
16,435.59
10,400.00
85.74
17.49
71.15
Pass - Minor l/50
J-12 - J-12 - J-12
12,050.00
9,875.00
631.51
289.49
346.24
Pass - Major Risk
J -14 -J -14-J-14
2,864.43
2,975.00
416.58
76.18
347.80
Pass - Major Risk
J-14 - J-1 4A - J -14A
2,864.43
2,975.00
416.58
76.18
347.80
Pass - Major Risk
J-15 - J-15 - J-15
2,869.51
3,025.00
320.30
45.32
278.95
Pass - Major Risk
J -15 -J -15A -J -15A
2,869.51
3,025.00
320.30
45.32
278.95
Pass - Major Risk
J-1 5 - J-1 5B - J -15B
2,869.51
3,025.00
320.30
45.32
278.95
Pass - Major Risk
J -16 -J -16-J-16
3,264.28
3,275.00
91.31
52.86
38.45
Pass - Major Risk
J-16 - J -16A - J -16A
3,264.28
3,275.00
91.31
52.86
38.45
Pass - Major Risk
J-16 - J-168 - J-1 Be
3,264.28
3,275.00
91.31
52.86
38.45
Pass - Major Risk
J-1 6 - J- 1 6BPB I - J-1 6BPB1
3,264.28
3,275.00
91.31
52.75
38.56
Pass - Major Risk
J -17 -J -17-J-17
3,055.65
3,050.00
23.95
4.58
19.38
Pass - Minor l/50 '
J-17 - J-1 7A - J-1 7A
3,055.65
3,050.00
23.95
4.80
19.16
Pass - Minor l/50 '
J-17 - J-1 7B - J -17B
3,055.65
3,050.00
23.95
4.80
19.16
Pass - Minor l/50 '
J-17-J-17BPB1-J-17BPB1
3,055.65
3,050.00
23.95
4,80
19.16
Pass - Minor l/50 "
J-1 7 - J -17C - J-1 7C
3,038.74
3,025.00
23.74
4.43
19.31
Pass - Minor l/50 "
J-17 - J -17D - J-1 7D
3,038.74
3,025.00
23.74
4.43
19.31
Pass - Minor 1/50
J -18 -J -18-J-18
2,865.36
3,475.00
1,488.33
178.49
1,424.29
Pass - Major Risk
J-1 8 - J-1 8A - J-1 8A
2,865.36
3,475.00
1,488.33
178.49
1,424.29
Pass - Major Risk
J -21 -J -21-J-21
14,287.40
9,300.00
539.62
187.96
353.13
Pass - Major Risk
J -22 -J -22-J-22
4,831.24
4,675.00
364.70
87.65
28248
Pass - Major Risk
J-22 - J -22A - J -22A
4,831.24
4,675.00
364.70
87.65
282A8
Pass - Major Risk
J -23 -J -23-J-23
3,800.00
4,175.00
1,030.94
163.14
868.62
Pass - Major Risk
J-23 - J -23A - J -23A
3,791.51
4,150.00
1,029.71
160.95
869.52
Pass - Major Risk
J -24 -J -24-J-24
9,229.96
8,275.00
481.16
275.91
204.96
Pass - Major Risk
J-24 - J -24A - J -24A
9,229.96
8,275.00
481.16
275.91
204.96
Pass - Major Risk
J-24 - J-24APB1 - J-24APB1
9,229.96
B,275.00
481.16
275.91
204.96
Pass- Major Risk
J-24 - J-24APB2 - J-24APB2
9,229.96
8,275.00
481.16
275.91
204.96
Pass - Major Risk
J-25 - J-25 - J-25
3,352.64
3,350.00
87.91
61.09
26.99
Pass - Major Risk
J-25 - J -25A - J -25A
3,352.64
3,350.00
B7.91
61.09
26.99
Pass - Major Risk
J-25 - J -25A - Plan #6
3,352.68
3,350.00
87.92
61.20
26.88
Pass - Major Risk
J -26 -J -26-J-26
2,874.71
2,875.00
342.88
46.47
297.19
Pass - Major Risk
J -27 -J -27-J-27
3,086.23
3,075.00
31.72
11.65
20.08
Pass - Minor l/50
J-27 - J -27A - J -27A
3,086.23
3,075.00
31.72
11.65
20.08
Pass - Minor l/50 '
J-27 - J -27B - J -27B
3,086.23
3,075.00
31.72
11.65
20.08
Pass - Minor l/50 -
J -28 -J -28-J-28
3,232.50
3,225.00
19.39
0.00
19.39
Pass-NOERRORS
J-28-J-28PB1-J-28PB1
3,232.50
3,225.00
19.39
0.00
19.39
Pass-NOERRORS
J-29 - J-29 - J-29
3,332.49
3,300.00
208.40
60.22
148.42
Pass - Major Risk
5/52017 4:01:40PM Page 3 of 5 COMPASS 5000.1 Build BIB
Summary
Site Name
Offset Well - Wellbore - Design
PB J Pad
J-29 - J-29 - Plan #9d J-29 approved
BP
Anticollision Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Reference
Offset
=b P
Measured
Measured
Centre
Company:
North America -ALASKA -BP
Project:
Prudhoe Bay
Reference Site:
PB J Pad
Site Error:
0o0usft
Reference Well:
J-28
Well Error:
o.00usft
Reference Wellbore
J -28A
Reference Design:
J -28A wp07A
Summary
Site Name
Offset Well - Wellbore - Design
PB J Pad
J-29 - J-29 - Plan #9d J-29 approved
BP
Anticollision Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Reference
Offset
Centre to
Measured
Measured
Centre
Depth
Depth
Distance
(usft)
(usft)
(usft)
3,329.96
3.300.00
194.68
ri.I
BAKER
HUGHES
Well J-28
J -28A Planning @ 86.66usft (rigx)
J -28A Planning @ 86.66usft (rigx)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
No -Go
Allowable
Distance
Deviation Waminc
(usft)
from Plan
(usft)
61.28
133.55 Pass -Major Risk
53/2017 4:01:40PM Page 4 of 5 COMPASS 5000.1 Build BIB
BP
V/ -/p Anticollision Report BAKER
FeAks
HUGHES
Company:
North America -ALASKA -BP
Project:
Prudhoe Bay
Reference Site:
PB J Pad
Site Error:
O.00usft
Reference Well:
J-28
Well Error:
O.00usft
Reference Wellbore
J -28A
Reference Design:
J-28Awp07A
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well J-28
J -28A Planning @ 86.66usft (dgx)
J -28A Planning Q 86.66usft (dgx)
True
Minimum Curvature
1.00 sigma
EDM RSK - Alaska PROD - ANCP1
Offset Datum
leference Depths are relative to J -28A Planning @ 86.66usft (rigx)
Coordinates are relative to: J-28
)ftset Depths are relative to Offset Datum
Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-(J,, AK
;emrel Meridian is 150° Or 0.000 W -
Grid Convergence at Surface is: 1.09*
Ladder Plot
v
J -01,J -01,J-01
-fr J-01,J-01A,J-01AV1
$ J-01,J-01B,J-016V7
$ ,403,JA3,J-03V1
$ J-05,J-05B,J-0SBV14
$ ,105,J-05C,J-05CV2
$ ,105,J-05CL1,J-05C1.1 V2
-X- J -06,.106,J -06V1
i- J -07,J-07,.-07\17
$ J-07,J-07A,J-07AV1
$ J-08,J-08A,J-08AV8
-A- J-09,J-09A,J-09AV2
$ J-16,J-166,J-16BV0
$ ,116,J-16BPB1,J-16BPB1 VO
$ J -17,J -17,J -17V5
$ J-17,J-17A,J-17AV5
$ J-17,J-176,J-17BV15
$ J-17,1-17BP61,J-178P81 V4
�E- J-17,J-17C,J-17CV11
-ate J-17„1170,J-17DV0
�(- .118„N8,J-18 V7
-*- J-25,J-25A,J-25AV2
$ J-25,J-25A,Plan*6V3
- - ,126„126, J-26 V1
$ .127,J-27„127 V7
-0- J-27,J-27A,J-27AV3
$ ,127„1276,J-27BV0
J -28„128„-28V7
-� .128.J-28PB1,J-28PB1 V0
--� J-29,.129„129 VO
G
5152017 4:01:40PM Page 5 of 5 COMPASS 5000.1 Build 81B
irk
v
J -01,J -01,J-01
-fr J-01,J-01A,J-01AV1
$ J-01,J-01B,J-016V7
$ ,403,JA3,J-03V1
$ J-05,J-05B,J-0SBV14
$ ,105,J-05C,J-05CV2
$ ,105,J-05CL1,J-05C1.1 V2
-X- J -06,.106,J -06V1
i- J -07,J-07,.-07\17
$ J-07,J-07A,J-07AV1
$ J-08,J-08A,J-08AV8
-A- J-09,J-09A,J-09AV2
$ J-16,J-166,J-16BV0
$ ,116,J-16BPB1,J-16BPB1 VO
$ J -17,J -17,J -17V5
$ J-17,J-17A,J-17AV5
$ J-17,J-176,J-17BV15
$ J-17,1-17BP61,J-178P81 V4
�E- J-17,J-17C,J-17CV11
-ate J-17„1170,J-17DV0
�(- .118„N8,J-18 V7
-*- J-25,J-25A,J-25AV2
$ J-25,J-25A,Plan*6V3
- - ,126„126, J-26 V1
$ .127,J-27„127 V7
-0- J-27,J-27A,J-27AV3
$ ,127„1276,J-27BV0
J -28„128„-28V7
-� .128.J-28PB1,J-28PB1 V0
--� J-29,.129„129 VO
G
5152017 4:01:40PM Page 5 of 5 COMPASS 5000.1 Build 81B
< e (U!A3sn 005) (+)9uoN/(-)ginoS
a
3
8
8
8
$asagsg fa;aag 2m 24w
aE aosowoxox o-ooaoa
aaassag8Nag-
MA A��y�3�
�asaae��$���m����x�m„ssser�xse
H as gal gig
"'='$mem?$e�ex:aa�s.aase��saaaa
o8`r° e$m8<8$8r$m"6$$$°m'e8e
�p'�mmm8« em mm mSp
o&p888$8`e88888.oem8=e$88�8$��m8
prm«o�pppp m m
w "ene�'mm'$n$eSR-m99- V G'< � e v m A m ti'p'f'A
imo^mNNr�Q rr
oSem88N8mts 2s
m88
a"88+'.8 `�m�g+888888Rir��6Se88«H8Soo`S
R—HUR
mm
88.$
24a;
e'im
8 &�°'�mf34`m'$mpmerrNmmm�e�;soo am
k8;mn'^
U Q
m
KR K
C ��ZbO T.7
%
�'aasag�aB.
��'r stxtxa3
g' X88,8 a88`r"°
o
a�2
LL��8ae88 o,
o$�yloo__
f
4 a
m� w
33 uv
(m/`lisn NJ CtoQ leolva'A only
0
3
m� 5p5�
a nii�
Mm
v
o
648000
64))00 d
r 3
64)400
64)100 N -
546800'
646500
646200
oeoau4� j
`\ O
645000
644]00
Northing (300 usft/in)
o a o o e o
648000
a � 0006
O
'. ,lp0 4 - � '64]]00
p0
�. ---60400
4 -. ..!647100
OS �84u500
00 0
Opp o 0
m 646200
a
m m
- 00 I ^ 645900
645600
pQ06
` 695300
000
--:645000
—644700
o
OOV
1
o
644100
--
- --
--O
OOOS
- -
^664100
O
643000¢
-,643800
a
643500�
r?-_--
- 4_643600 643600
6432oo;
-
'
�
_
b
d 6a3zoo �
5
Q
642900
m
60
�642900 m
o
642600
642800
o m
0
Q
U642300
C
o _
OOS
..602300
I
C
R 642000
642000 A
641700 0
-
OH
64 700
!/ \1
o
641400
641400
'
O
o O
S
09
641100
40
mom
0
S00
641100
o
640800.
u
m
o
a
640800
640500
-
--
1.
OH
640500
000
640200 -
-
-
--
640200
639900Oo
000
000"
O
639900
839600 -
--5
-
-
Q
639600
$ffi
H0"
639300
H.
639300
6390001639000
638700638700
638]00
638400
-
-
638400
638100
--
N
630100
637800
o
-
637800
63]500
83)500 �
63)200
-
-63)200
636900
-
3 6900
o r
q
$
(u!/1Jsn 000 duiyuop
-
- -
—
Loepp, Victoria T (DOA)
From: Raese, J. Kyle <john.raese@bp.com>
Sent: Tuesday, May 16, 2017 10:46 AM
To: Loepp, Victoria T (DOA)
Cc: Lastufka, Joseph N
Subject: RE: PBU J-28(PTD 187-041, Sundry 317-194) Plug for Redrill
Follow Up Flag: Follow up
Flag Status: Completed
Victoria,
We will install the scoop guide assembly after pulling the top `2 joints of existing 9-5/8" casing. We are pulling the top
"2 joints in order to make room in the wellhead casing spool for the installation of the 7" casing (after drilling the
intermediate section). The scoop guide assembly consists of a 9-5/8" casing patch, pup with wiper plug and scoop guide
(listed from bottom to top). The scoop guide itself is similar to a funnel — it will help direct drilling tools from the larger
13-3/8" casing down into the 9-5/8" casing. The wiper plug will prevent drilling fluids from entering the 13-3/8" x 9-5/8"
annulus while drilling. The casing patch will secure the scoop guide assembly to the 9-5/8" casing stub. Let me know if
you have more questions regarding this tool.
Thanks,
Kyle Raese
Drilling Engineer
BP Exploration (Alaska)
o: 907-564-4629
c: 907-301-6405
From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.gov)
Sent: Tuesday, May 16, 2017 9:41 AM
To: Raese, J. Kyle <john.raese@bp.com>
Subject: PBU 1-28(PTD 187-041, Sundry 317-194) Plug for Redrill
Kyle,
Please explain what the scoop guide is and how it works.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria Loepp(Malaska oov
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
TRANSMITTAL LETTER CHECKLIST
WELL NAME:
PTD:
Development _ Service _ Exploratory _ Stratigraphi'c Test _ Non -Conventional
FIELD: " P.
Check Boz for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. API No. 50-
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50-
_
_-) from records, data and logs acquired for well
name on ermit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Comanany Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samriles are first can" and 10' sam le intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance a roval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2XB) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 da s after com letion, sus ension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 — Well Name: PRUDHOE BAY_UNIT J -28A_ _ Program DEV — Well bore seg
PTD#:2170750 Company BP EXPLORATION (ALASKA) INC. Initial Class/Type _ _ DEV / PENDGeoArea 890 Unit 11650 On/Off Shore On Annular Disposal
Administration i
rernin red audu,eu-
Surface casing protects all known USOWs -
2
Lease number appropriate.. -
Yes
3
Unique well name and number
Yes -
4
Well located in a. defined pool
Yes
5
Well located proper distance from drilling unit boundary
Yes
6
Well located proper distance from other wells
Yes
7
Sufficient acreage. available in. drilling unit
Yes
8
If. deviated, is wellbore plat included
Yes
9
Operator only affected party -
Yes
10
Operator hasappropriatebond in force
Yes
11
Permit can be issued without conservation order.
Yes
Appr Date 12
Permit can be issued without administrative approval
Yes
13
Can permit be approved before 15 -day wait
Yes
SFD 5/15/2017 14
Well located within area and strata authorized by Injection Order # (put. 10# in comments) (For.
NA
15
All wells within 1/4 mile area of review identified (For service well only)
NA.
16
Pre -produced injector; duration of pre -production less than 3 months (For service well only)
NA
17
Nonconven. gas. conforms to AS31,05.0300.1.A),0.2.A-D)
NA
18
Conductor string provided - -
NA
Engineering
19
Surface casing protects all known USOWs -
NA
20
CMT vol adequate to circulate on conductor & surf csg
- NA
21
CMT. vol adequate to tie-in long string to surf csg
NA
22
CMT. will coverall knownproductivehorizons
Yes
23
Casing designs adequate for C, T, B & permafrost
Yes
24
Adequate tankage. or reserve pit
Yes
25
If a. re -drill, has a 10-403 for abandonment been approved
Yes
26
Adequate wellbore separation proposed
Yes
27
If diverter required, does it meet regulations
NA
Appr Date
28
Drilling fluid. program schematic & equip list. adequate
Yes
VTL 5/18/2017
29
BOPEs,-do they meet regulation - -
Yes
30
BOPE press rating appropriate; test to (put psig in comments)
Yes
31
Choke manifold complies w/API RP -53 (May 84)
Yes
32
Work will occur without operation shutdown.
Yes
33
Is presence of H2S gas probable
Yes
34
Mechanical condition of wells within AOR verified (For service well only)
NA
35
Permit can be issued w/o hydrogen. sulfide measures
No
Geology
36
Data presented on potential overpressure zones
Yes
Appr Date
37
Seismic analysis of shallow gas zones
NA
SFD 5/15/2017
38
Seabed condition survey (if off -shore)
NA
39
Contact name/phone for weekly progress reports [exploratory only]
NA
Geologic Engineering Public
Commissioner: Date: Commissioner: Date C,o}mmiLsioner Date
- Surf Loc & Top Prod Int lie in ADL0028281; TO lies -in ADL0028282.. -
PRUDHOE BAY, PRUDHOE-OIL POOL - 64015, governed by CO 341 F
CO 341 F, Rule 2:- There shall be no restrictions as to well spacing except thatno pay shall be
opened in a well closer than 500 feet to the boundary of the affected. area. Planned well conforms to CO
- 341F, Rule 2.. - - - - -
Conductor set in PBU J-28
Surface casing set in PBU J-28
Surface casing set and fully. cemented
Productive. interval will be completed with. cemented production liner and perforated
Rig has steel tanks; all. waste to approved disposal wells
PTD 187-041,Sundry 317-194
Anti -collision analysis complete;major risk failures: J-07, J-1 J-27 SI w/ TT plug; .J-11 SI@surf
Max formation pressure is 3212 psig(7.22 ppg EMW ); will drill. w/ 9.2-11.0 ppg EMW
MPSP is 2356 psig; will test BOPS to 3500 psig
H2S measures required
J -Pad wells are H2S-bearing. H2S measures are. required.
Planned mud weights appear adequate to control the operator's forecast of most likely pore pressures.
Should higher pore pressures be encountered, BP has immediate access to nearby fluid. mixing. facilities.