Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout217-093Operator Name:2.
Development Exploratory
Service
5
Permit to Drill Number:217-093
6.50-029-20608-02-00
PRUDHOE BAY, PRUDHOE OIL
Hilcorp North Slope, LLC 5.
Well Name and Number:8.
10.Field/Pools:
Well Class Before Work4.
Present Well Condition Summary:11.
Total Depth: measured feet
feet
Plugs measured feet
feet
Effective Depth: measured feet
feet
Packer measured feet
feettrue vertical true vertical
12750
12655
8690
9224
none
none
8428
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20" 94# 47 - 127 47 - 127 1530 520
Surface 2571 13-3/8" 47 - 2618 47 - 2618 5380 2670
Intermediate 3163 9-5/8" 45 - 3208 45 - 3203 6870 4760
Intermediate 9434 7" 42 - 9476 42 - 8646 7240 5410
Perforation Depth: Measured depth: 9695 - 12655
feet
True vertical depth:8813 - 8690 feet
Tubing (size, grade, measured and true vertical depth)4-1/2" 13Cr85 40 - 9317 40 - 8509
9224 8428Packers and SSSV (type, measured and
true vertical depth)
4-1/2" HES TNT Perm Packer
Liner 3442 4-1/2" 9306 - 12748 8499 - 8690 8430 7500
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
308510106276
84017413 682
10882
918 342
Representative Daily Average Production or Injection Data
Prior to well operation:
Subsequent to operation:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name:
Contact Email:
Ryan Thompson
Ryan.Thompson@hilcorp.com
Authorized Name:Bo York
Authorized Title:
Authorized Signature with Date:Contact Phone:907-564-5280
Treatment descriptions including volumes used and final pressure:
13.
Operations Manager
Operations Performed1.
Abandon Plug Perforations Fracture Stimulate Pull Tubing
GSTOR WINJ WAG GINJ SUSP SPLUG
16. Well Status after work:Oil 5 Gas
Exploratory Development 5 Stratigraphic
15. Well Class after work:
Service
WDSPL
14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283)
Daily Report of Well Operations
Copies of Logs and Surveys Run
true vertical measured8690
Sundry Number or N/A if C.O. Exempt:
N/A
no SSSV
Junk
Packer
Printed and Electronic Fracture Stimulation Data
5
Operations shutdown
Change Approved Program
Senior Pet Engineer:Senior Res. Engineer:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Suspend 5Perforate Other Stimulate Alter Casing
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well
3.Address: 3800 Centerpoint Dr, Suite
1400, Anchorage, AK 99503
7.Property Designation (Lease Number):ADL 028312 PBU 14-16B
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
Stratigraphic
Other:
API Number:
Form 10-404 Revised 03/2020 Submit Within 30 days of Operations
By Samantha Carlisle at 10:11 am, Nov 17, 2020
Digitally signed by Bo York
DN: cn=Bo York, c=US, o=HIlcorp
Alaska LLC, ou=Alaska North
Slope, email=byork@hilcorp.com
Date: 2020.11.17 09:57:30 -09'00'
Bo York
RBDMS HEW 11/17/2020
DSR-11/17/2020 SFD 11/18/2020MGR11JAN2020
ACTIVITYDATE SUMMARY
10/22/2020
T/I/O/OO = 300/490/190/140. Temp = 120°. T FL (E-line req). ALP 490 psi, AL
online. T FL @ surface, well is flowing.
SV = C. WV, SSV, MV = O. IA, OA, OOA = OTG. 20:30
10/23/2020
...Well flowing on arrival... (HES Eline - drift/adperf)
DRIFT TO 9814' ELMD WITH 3.125"x 34' DUMMY GUN TOOLSTRING. (toolstring
shorted at 9300' while RIH, continued drift past target perf depth).
JEWELRY LOG FROM 9,805' - 9,050' ELMD.
...Continued on 24-OCT-2020 WSR...
10/23/2020
T/I/O = 1430/540/80. Temp = SI. T FL (E-line). ALP = 490 psi, AL SI @ casing
valve. T FL @ 9281' (171' below sta #1, DMY).
E-line in control of well upon departure. 20:45
10/24/2020
...Continued from 24-OCT-20.... (HES Eline - drift/adperf)
PERFORATE 9,693'-9,707' AND 9,715'-9,720' WITH 3.125", 6 SPF, 60 DEG
PHASING LOADED WITH 22.7 GR GEODYNAMIX BASIX CHARGES.
REFERENCE LOG DEPTHS 9,695' - 9,709' AND 9,717' - 9,722'. BP PDCL 13-NOV-
2017.
***Job Complete. Well turned over to DSO to POP.***
10/24/2020
T/I/O/OO= 1540/600/160/60. LRS unit 72 Assist E-Line (PERFORATING) Load the
TBG with 170 bbls of crude at 5 bpm. Final T/I/O/OO= 0/600/160/60.
Daily Report of Well Operations
PBU 14-16B
217093
313>0
BA ER 0 PRINT DISTRIBUTION LIST
I UGHES
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME 14-16B
FIELD Prudhoe Bay Unit
COUNTY North
BHI DISTRICT Alaska
lse sign and return one copy of this transmittal form to:
Exploration (Alaska) Inc.
rotechnical Data Center, 1112-1
) E. Benson Blvd.
-horage, Alaska 99508 orAKGDMINTERNAL@bp.com
LOG TYPE RPM:PNC3D
LOG DATE August 17, 2019
AUTHORIZED BY Dirk Zeijlemaker
EMAIL Dirk zeiilemaker(abakerhucthes.com TODAYS DATE October 18, 2019
Revision
STATUS Final Replacement: No Details:
Rev. Requested by: --
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
V
BP North Slope.
EOA. PBOC, PRB-20 (Office 109)
D&C Wells Project Aids Agatha Burka & Barbara Glassmaker
900 E. Reason Blvd.
Anchorage. Alaska 99508
FIELD 1
FINAL
CD/DVD
FINAL
PRELIM
(las, dlis, PDF, META,
SURVEY
I
REPORT
LOGS
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTS
# OF COPIES
# OF COPIES
# OF COPIES
lu 4 J;
2 ConocoPhillips Alaska Inc.
Atm: Ricky Elgarico RC
G
ATO 3-344 (�
700 G Street OCT 2 2 2019
Anchorage, AK 99501 _
3 Exxon Mobil, Alaska
Attn: Lynda M. Yaskell and/or Lisa Boggs
3201 C Street, Suite 505
Anchorage, AK 99503
4'. State of Alaska - AOGCC 1
Attn: Natural Resources Technician it
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR - Division of Oil & Gas ... 1
Attn: Garret Brown
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
6 RP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Attn: David Itter 0
M,
TOTALS FOR THIS PAGE: 0 1 4 0 0
WELL LOG TRANSMITTAL #905895846
To: Alaska Oil and Gas Conservation Comm. September 12, 2019
Attn.: Natural Resource Technician
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: Production Profile: 14-16B
Run Date: 8/17/2019
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518
14-16B
Digital Data (LAS), Digital Log file RECEIVED1 CD Rom
50-029-20606-02
SEP 2 4 2019
AOGCC
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Halliburton
Wireline & Perforating
Attn: Fanny Sari
6900 Arctic Blvd.
Anchorage, Alaska 99518
Office: 907-275-2605
FRS_ANC@ha%lliibuurtoon.ccoo and GANCPDC@USAANC.hou
Date: l/ 61 !/" " Signed:
21 309,;
3 124 4
DATA SUBMITTAL COMPLIANCE REPORT
1/26/2018
Permit to Drill
2170830
Well Name/No. PRUDHOE BAY UNIT 14-16B
- -V,1' Operator SP EXPLORATION (ALASKA) INC.
MD 12750
TVD
8690 Completion Date 10/24/2017
Completion Status 1-0I1- Current Status 1 -OIL
REQUIRED INFORMATION
Mud Log No
DATA INFORMATION
List of Logs Obtained: MWD/GR/RES/DEN/NEU
Well Log Information:
Log/ Electr
Data Digital Dataset
Type MedlFrmt Number Name
ED C 28898 Digital Data
ED C 28898 Digital Data
ED C 28898 Digital Data
ED C 28898 Digital Data
ED C 28898 Digital Data
ED C 28898 Digital Data
ED C
ED C
ED C
ED C
ED C
ED C
28898 Digital Data
28898 Digital Data
28898 Digital Data
28898 Digital Data
28898 Digital Data
28898 Digital Data
API No. 50-029-20608-02-00
UIC No
Samples No f Directional Survey Yes t/
(from Master Well Data/Logs)
Log Log Run Interval OH /
Scale Media No Start Stop CH Received
Comments
12/18/2017
Electronic File: 14-16B_BHI_LTK_2MD_Memory
Drilling Log.cgm
12/18/2017
Electronic File: 14-
16B_BHI _LTK_2TVDSS_Memory Drilling '
Log.cgm
12/18/2017
Electronic File: 14-16B_BHI_LTK_5MD_Memory
Drilling Log.cgm
12/18/2017
Electronic File: 14
16B_BHI _LTK_5TVDSS_Memory Drilling
Log.cgm
12/18/2017
Electronic File: 14-16B_BHI_STK_5MD_Memory
Drilling Log.cgm
12/18/2017
Electronic File: 14-
166 —BI -Ill Composite FE Drilling
Data.dlis
12/18/2017
Electronic File: 14-16B_BHI_LTK_2MD_Memory
P
Drilling Log.pdf
12/18/2017
Electronic File: 14-
,2
16B_BHI_LTK_2TVDSS_Memory Drilling Log.pdf
12/18/2017
Electronic File: 14-16B_BHI_LTK_51VID_ Memory -
P
Drilling Log.pdf
12/18/2017
Electronic File: 14-
e
16B_BHI_LTK_5TVDSS_Memory Drilling Log.pdf
12/18/2017
Electronic File: 14-16B_BHI_STK_5MD_ Memory .
•P
Drilling Log.pdf
12/18/2017
Electronic File: 14-168 AOGCC Offset Report.pdf
AOGCC Page I of Friday, January26, 2018
DATA SUBMITTAL COMPLIANCE REPORT
1/26/2018
Permit to Drill 2170930 Well Name/No. PRUDHOE BAY UNIT 14-16B
MD
12750
TVD 8690
ED
C
28898 Digital Data
ED
C
28898 Digital Data
ED
C
28898 Digital Data
ED
C
28898 Digital Data
ED
C
28898 Digital Data
Completion Date 10/24/2017
Operator SP EXPLORATION (ALASKA) INC. API No. 50-029-20608-02-00
Completion Status 1 -OIL
3179 12750
Log
C
28898 Log Header Scans 0 0
Log
C
28899 Log Header Scans 0 0
ED
C
28899 Digital Data 3180 10945
ED
C
28899 Digital Data
ED
C
28899 Digital Data
ED
C
28899 Digital Data
ED
C
28899 Digital Data
ED
C
28899 Digital Data
ED
C
28899 Digital Data
ED
C
28899 Digital Data
Current Status 1 -OIL UIC No
12/18/2017 Electronic File: 14-16B_BHI_Final Survey
AOGCC Page 2 of 4 Friday, January 26, 2018
Report.pdf
12/18/2017
Electronic File: 14-16B—BHI—Final Survey -
Report.txt
12/18/2017
Electronic File: 14-16B—BHI—Final Survey.csv
12/18/2017
Electronic File: 14-16B—BHI—Final Survey.xlsx
12/18/2017
Electronic Data Set, Filename: 14-
168_BHI_LTK_MEM _Composite FE Drilling
Data.las
2170930 PRUDHOE BAY UNIT 14-16B LOG
HEADERS
2170930 PRUDHOE BAY UNIT 14-16B PB1
LOG HEADERS
12/18/2017
Electronic Data Set, Filename: 14-
16BP61_BHI _LTK_MEM _Composite FE Drilling
Data.las
12/18/2017
Electronic File: 14-
166PB1_BHI_LTK_2MD_Memory Drilling<
Log.cgm
12/18/2017
Electronic File: 14-
16BPB1_BHI_LTK_2TVDSS_Memory Drilling'
Log.cgm
12/18/2017
Electronic File: 14-
16BPB1_BHI_LTK_5MD_Memory Drilling
Log.cgm
12/18/2017
Electronic File: 14-
16BPB1_BHI_LTK_5TVDSS_Memory Drilling
Log.ogm
12/18/2017
Electronic File: 14-
16BPB1_BHI_STK _5MD_MemoryDrilling -
Log.cgm
12/18/2017
Electronic File: 14-
16BPB1_BHI_LTK_MEM _Composite FE Drilling
Data.dlis
12/18/2017
Electronic File: 14-
P
16BPB1_BHI_LTK_2MD_Memory Drilling Log.pdf
AOGCC Page 2 of 4 Friday, January 26, 2018
DATA SUBMITTAL COMPLIANCE REPORT
1/26/2018
Permit to Drill
2170930 Well Name/No. PRUDHOE BAY UNIT 14-16B
Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20608-02-00
MD
12750
TVD 8690 Completion Date 10/24/2017
Completion Status 1-0I1- Current Status 1-0I1- UIC No
ED
C
28899 Digital Data
12/18/2017
Electronic File: 14-
,P
16BPB1_BHI_LTK_2TVDSS_Memory Drilling
Log.pdf
ED
C
28899 Digital Data
/18/2017
Electronic File: 14-
16BPB1_BHI_LTK_5MD_Memory Drilling Log.pdf
ED
C
28899 Digital Data
12/18/2017
Electronic File: 14
P
16BP61_BHI_LTK_5TVDSS_Memory Drilling -
Log.pdf
ED
C
28899 Digital Data
12/18/2017
Electronic File: 14-
P
16BPB1 BHI_STK_5MD_Memory Drilling Log.pdf ..
ED
C
28899 Digital Data
12/18/2017
Electronic File: 14-16BPB1_BHI_Final Survey
P
Report.pdf
ED
C
28899 Digital Data
12/18/2017
Electronic File: 14-16BPB1_BHI_Final Survey .
Report.txt
ED
C
28899 Digital Data
12/18/2017
Electronic File: 14-16BPB1_BHI_Final Survey.csv
ED
C
28899 Digital Data
12/18/2017
Electronic File: 14-16BPB1_BHI_Final Survey.xlsx
Well Cores/Samples Information:
Sample
Interval
Set
Name
Start Stop
Sent Received Number
Comments
INFORMATION RECEIVED
Completion Report O
Production Test InformationOY / NA
Geologic Markers/Tops 0
COMPLIANCE HISTORY
Completion Date:
Release Date:
Description
10/24/2017
7/18/2017
Directional / Inclination Data O Mud Logs, Image Files, Digital Data Y /®
Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files1P
Daily Operations Summary OY Cuttings Samples Y / OA
Date
Comments
Core Chips Y /6�
Core Photographs Y /CJ
Laboratory Analyses Y / l`tCii
AOGCC Page 3 of Friday, January 26, 2018
DATA SUBMITTAL COMPLIANCE REPORT
1126/2018
Permit to Drill 2170930 Well Name/No. PRUDHOE BAY UNIT 14-16B Operator BP EXPLORATION (ALASKA) INC.
MD 12750 TVD 8690 Completion Date 10/24/2017 Completion Status 1-0I1- Current Status 1-0I1
Comments:
Compliance Reviewed By:
API No. 50-029-20608-02.00
UIC No
Date:
AUGCC Page 4 of Friday, January 26, 2018
DEC 18 2017
BA ER A� PRINT DISTRIBUTION LIST
F�UGHEB
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME
14-16B
CD/DVD
FIELD
Prudhoe Bay Unit
PRELIM
COUNTY
PRUDHOE BAY
SURVEY
BHI DISTRICT
Alaska
AUTHORIZED BY Paul Canizares
EMAIL Paul.Canizaresp_bhoe.com
STATUS Final Replacement:
COMPANY
ADDRESS (FEDEX MALL NOT DELIVER TO P.O. BOX)
PERSON ATTnENTION
V
t BP North slope. — —
EOA, PBOC. PRP -20 (Office 109)
D&C Wells Project Aides
Attn: Bends Glassmaker & Peggy O'Neil
900 E. Benson Blvd.
Anchorage, Alaska 99508
21 7093
286;90
Please sign and return one copy of this transmittal form to:
BP Exploration (Alaska) Inc. DATA LOGGED
Petrotechnical Data Center, L12-1 I /It /2014
M. K. BENDER
900 E. Benson Blvd.
Anchorage, Alaska 99508 or AKGDMINTERNAL@bp.com
to acknowledge receipt of this data.
LOG TYPE GR-RES-DEN-NEU
STK:Image Log
LOG DATE October 18, 2017
TODAYS DATE December 18, 2017
Revision
Details:
Rev. Requested by:
FIELDI
FINAL
CD/DVD
FINAL
PRELIM
(las, dlis, PDF, META,
I
SURVEY
REPORT
LOGS
LOGS
CGM, Final S;,Ne
(Compass)
# OF PRINTS
# OF COPIES
# OF COPIES
# OF COPIES
M
2 ConocoPhillips Alaska Inc. D D D
Attn: Ricky Elgarico
ATO 3.344
700 G Street
Anchorage, AK 99510
3 ExsonMobil. Alaska D 0 0
Attn: Lynda M. Yaskell and/or Lisa Boggs
3201 C Street, Suite 505
Anchorage, AK 99503
e of Alaska -AOGCC
I: Makana Bender
W. 7th Ave. Suite 100
hora¢e. Alaska 99501
DNR -Division of Oil&Gas
Attn: Garret Brown
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
"*• Stamp "confidential" on all material
BP Exploration (Alaska) Inc. I I
Petrotechnical Data Center, LR2-1 1-
900 E. Benson Blvd.
Anchorage, Alaska 99508
Attn: Gerardo Cedillo
TOTALS FOR THIS PAGE: 0 2 5 4 0
0 by
DEC 18 2)`x;7
AOGCC
North America - ALASKA - BP
Prudhoe Bay
PB DS 14
14-16
14-16B
500292060802
Design: 14-16B
Final Survey Report
19 October, 2017
BAT00
ER a GE company
21 7093
28898
by
14-168
BP
Final Survey Report
ER
1UGHES
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 14-16
Latitude:
70' 14'26.346 N
TVD Reference:
1416B Actual @ 88.71usft (Actual P272)
Project:
Prudhoe Bay
MD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
She.
PB DS 14
North Reference:
True
Well:
1416
Survey Calculation Method:
Minimum Curvature
Wellbore:
14-16B
Database:
EDM R5K - Alaska PROD - ANCP1
Design:
14-16B
Prudhoe Bay, PBU, PRUDHOE
m:
FGe.D.t._:
Alaska NAD27 Stale Plane Zones
System Datum:
Mean Sea Level
Using Well Reference Paint
NAD27' OGP-Usa AK [4267'15864]
Using geodetic scale factor
Magnetics
NAD27' OGP-Usa AK / Alaska zone 4 [26734'1586
Declination
Dip Angle
Site. PB DS 14, TR -10-14
14-168
Audit Notes:
Northing:
5,939,577.430 usft
Latitude:
70' 14'26.346 N
She Position:
Easting:
674,150.480 usft
Longitude:
148° 35'36.726 W
From: Map
Position Uncertainty: 0.00 usft
Slot Radius:
0.000 in
Grid Convergence:
1.32 '
Design
14-168
Audit Notes:
Well
14-16,14-16
Well Position
-N/-S 0.00 usft
Northing:
5,939,293.700 usft
Latitude:
70° 14'23.277 N
10,154.78
+E/ -W 0.00 usft
Easting:
675,373.690 usft
Longitude:
148' 35' 1.368 W
Position Uncertainty
0.00 usft
Wellhead Elevation:
42.16 usft
Ground Level:
41.91 usft
46.55
D.00
0.00
110.00
Wchbore
14-168
Magnetics
Model Name Sample Date
Declination
Dip Angle
Field Strength
(<)
(`)
(nT)
BGGM2017 9/25/2017
17.72
80.95
57,490
Design
14-168
Audit Notes:
Version:
Phase:
ACTUAL
Tie On Depth:
10,154.78
Vertical Section:
Depth From (TVD)
+N/ -S
+E/ -W
Direction
(usft)
(usft)
(usft)
(')
46.55
D.00
0.00
110.00
10/192017 12:44: 02PM Page 2 COMPASS 5000.1 Build 81D
am
BP
Final Survey Report
BAF�IGHES
E,. p,,
Company:
North America- ALASKA - BP
Local Coordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-168 Actual (ria 88.71 usft (Actual P272)
Site:
PB DS 14
MD Reference:
14-16B Actual @ 88.71usft (Actual P272)
Well:
14-16
North Reference:
True
Wellbore:
14-16B
Survey Calculation Method:
Minimum Curvature
Design:
14-16B
Database:
EDM R5K-Alaska PROD -ANCP1
Survey Program
Date 10/19/2017
Azi (azimuth)
From
To
NIS
EIW
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
117.71
3,192.71 Gyrodata Gryo (14-16)
GVD-CT-CMS
Gyrodata cont.casing m/s
3,208.00
9,437.08 BHGE ATK MWD 8-1/2"x97/8"(14-16BP
MWD+IFR+MS-WOCA
MWD+IFIR +Multi Station W/O Crustal
9,523.99
10,154.78 BHGE OTK MWD 61/8"(14-16BPB1)
MWD+IFR+MS-WOCA
MWD + FIR +Multi Station W/O Crustal
10,177.96
12,709.45 BHGE OTK MWD 6-1/8"(14-16B)
MWD+IFR+MS-WOCA
MWD+IFR +Multi Station W/O Crustal
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
(usft)
(°)
(•)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
46.55
0.00
0.00
46.55
-42.16
0.00
0.00
5,939,293.700
675,373.690
0.00
117.71
0.16
333.51
117.71
29.00
0.09
-0.04
5,939,293.788
675,373.644
0.22
217.71
0.04
75.78
217.71
129.00
0.22
-0.07
5,939,293.921
675,373.612
0.17
317.71
0.16
105.18
317.71
229.00
0.19
0.10
5,939,293.897
675,373.781
0.13
417.71
0.33
127.69
417.71
329.00
-0.02
0.46
5,939,293.693
675,374.149
0.19
517.71
0.39
112.03
517.71
429.00
-0.32
1.00
5,939,293.402
675,374.699
0.11
617.71
0.41
106.56
617,70
528.99
-0.55
1.66
5,939,293.187
675,375.363
0.04
717.71
0.40
87.49
717.70
628.99
-0.64
2.35
5,939,293.117
675,376.056
0.13
817.71
0.36
53.57
817.70
728.99
-0.44
2.95
5,939,293.332
675,376.653
0.22
917.71
0.32
34.56
917.70
828.99
-0.02
3.36
5,939,293.758
675,377.054
0.12
1,017.71
0.38
31.14
1,017.70
928.99
0.49
3.69
5,939,294.280
675,377.372
0.06
1,117.71
0.44
38.58
1,117.69
1,028.98
1.08
4.11
5,939,294.873
675,377.769
0.08
1,217.71
0.36
59.04
1,217.69
1,128.98
1.54
4.61
5,939,295.347
675,378.267
0.16
1,317.71
0.34
108.89
1,317.69
1,228.98
1.61
5.16
5,939,295.425
675,378.815
0.30
1,417.71
0.32
137.29
1,417.69
1,328.98
1.30
5.63
5,939,295.135
675,379.292
0.16
1,517.71
0.18
149.94
1,517.69
1,428.98
0.96
5.90
5,939,294.800
675,379.568
0.15
1,617.71
0.20
280.30
1,617.69
1,528.98
0.86
5.81
5,939,294.693
675,379.478
0.35
1,717.71
0.29
232.17
1,717.69
1,628.98
0.73
5.44
5,939,294.560
675,379.109
0.22
1,817.71
0.33
210.97
1,81768
1,728.97
0.33
5.09
5,939,294.150
675,378.771
0.12
1,917.71
0.33
212.92
1,917.68
1,828.97
-0.16
4.79
5,939,293.655
675,378.477
0.01
V. Sec
(usft)
0.00
-0.07
-0.14
0.02
0.44
1.05
1.75
2.43
2.92
3.17
3.30
3.49
3.81
4.30
4.85
5.22
5.17
4.86
4.67
4.55
10/19/2017 12.44.02PM Page 3 COMPASS 5000.1 Build BID
J
BP BAKER 1t(_ER
1T
by Final Survey Report IaGEc mass
Company:
North America - ALASKA - SP
Local Co-ordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-166 Actual @ 88.71 usfl (Actual P272)
MO Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Site:
PB DS 14
TVD
TVDSS
Well:
14-16
North Reference:
True
DI -eq
V. Sec
Survey Calculation Method:
Minimum Curvature
Wellbore:
14-16B
(usR)
(usN)
(usft)
(usR)
Database:
EDM R5K-Alaska PROD -ANCP1
Design:
14168
0.27
203.70
Survey
MD
Inc
Ari (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DI -eq
V. Sec
(usR)
(°)
(°)
(usft)
(usR)
(usN)
(usft)
(usR)
(usR)
(°/100usft)
(usR)
2,017.71
0.27
203.70
2,017.68
1,928.97
-0.61
4.53
5,939,293.192
675,378.237
0.08
4.47
2,117.71
0.36
211.62
2,117.68
2,028.97
-1.10
4.27
5,939,292.702
675,377.989
0.10
4.39
2,217.71
0.44
209.04
2,217.68
2128.97
-1.70
3.92
5,939,292.091
675,377.652
0.08
4.27
2,317.71
0.51
184.47
2,317.67
2,228.96
-2.48
3.70
5,939,291.307
675,377.449
0.21
4.33
2,417.71
0.74
173.79
2,417.67
2,328.96
-3.57
3.74
5,939,290.222
675,377.509
0.26
4.73
2,517.71
1.00
167.09
2,517.66
2,428.95
-5.06
4.00
5,939,288.737
675,377.809
0.28
5.49
2,617.71
0.83
167.76
2.617.64
2,528.93
-6.62
4.35
5,939,287.187
675,378.193
0.17
6.35
2,618.71
0.83
167.76
2,618.64
2,529.93
-6.63
4.35
5,939,287.173
675,378.197
0.00
6.36
13 3/8"
2,717.71
0.66
132.61
2,717.64
2,628.93
-7.71
4.93
5,939,286.103
675,378.796
0.48
7.27
2,817.71
1.08
105.35
2,817.62
2,728.91
-8.35
6.26
5,939,285.495
675,380.143
0.58
'8.74
2,917.71
5.87
51.37
2,917.42
2,828.71
-5.41
11.17
5,939,288.553
675,384.980
5.31
12.34
3,017.71
9.49
45.41
3,016.51
2,927.80
3.57
21.04
5,939,297.762
675,394.637
3.70
18.55
2,952.45
6.53
24.04
5,939,300.783
675,397.572
1.69
20.36
3,042.71
9.91
45.61
3,041.16
3,067.71
10.57
44.11
3,065.76
2,977.05
9.68
27.18
5,939,304.006
675,400.631
2.85
22.23
3,092.71
10.78
44.13
3,090.32
3,001.61
13.00
30.40
5,939,307.404
675,403.777
0.84
24.12
3,117,71
11.14
43.46
3,114.87
3,026.16
16.43
33.69
5,939,310.911
675.406.985
1.53
26.04
3,142.71
11.67
41.92
3,139.37
3,050.66
20.07
37.04
5,939,314.622
675,410.250
2.44
27.94
3,167.71
12.16
40.22
3,163.84
3,075.13
23.96
40.43
5,939,318.591
675,413.547
2.41
29.80
3,192.71
12.28
39.67
3,188.27
3,099.56
28.02
43.83
5,939,322.726
675,416.849
0.67
31.60
3,199.46
12.33
39.75
3,194.86
3,106.15
29.12
44.74
5,939,323.854
675,417.742
0.83
32.09
9618..
3,208.00
12.40
39.86
3,203.21
3,114.50
30.53
45.92
5,939,325.285
675,418.880
0.83
32.71
3,222.13
13.19
35.20
3,216.99
3,128.28
33.01
47.82
5,939,327.811
675,420.724
9.19
33.64
3,314.44
13.19
24.00
3,306.88
3,218.17
51.24
58.17
5,939,346,276
675,430.652
2.76
37.14
3,409.71
13.08
12.00
3,399.67
3,310.96
71.72
64.84
5,939,366.902
675,436,837
2.86
36.40
3,504.78
13.17
1.10
3,492.27
3,403.56
93.07
67.28
5,939,388.306
675,438.785
2.60
31.39
101192017 12:44 02P Page 4 COMPASS 5000.1 Build 61D
NZ
BP
Final Survey Report
BA <ER
F�UGHES
Company:
North America -ALASKA- BP
Local Coordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-16B Actual @ 88.71 usft (Actual P272)
Site:
PB DS 14
MD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Well:
14-16
North Reference:
True
Wellbore:
14-168
Survey Calculation Method:
Minimum Curvature
Design:
14-168
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
Ari (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(')
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
3,546.64
13.41
357.21
3,533.01
3,444.30
102.69
67.14
5,939,397.916
675,438.416
2.21
27.97
3,642.19
14.92
350.53
3,625.66
3,536.95
125.89
64.57
5,939,421.051
675,435.314
2.33
17.62
3,736.10
16.84
345.55
3,715.99
3,627.28
150.99
59.19
5,939,446.018
675,429.348
2.51
3.98
3,831.76
18.79
345.92
3,807.05
3,718.34
179.36
51.98
5,939,474.205
675,421.484
2.04
-12.49
3,925.23
20.09
350.10
3,895.20
3,806.49
209.77
45.56
5,939,504.464
675,414.356
2.04
-28.93
4,018.80
20.06
351.92
3,983.08
3,894.37
241.49
40.54
5,939,536.056
675,408.601
0.67
-44.50
4,113.17
21.08
358.43
4,071.45
3,982.74
274.49
37.80
5,939,568.975
675,405.094
2.65
-58.36
4,208.10
22.06
4.45
4,159.74
4,071.03
309.33
38.72
5,939,603.828
675,405.199
2.55
-69.42
4,302.52
22.64
9.80
4,247.08
4,158.37
344.92
43.19
5,939,639.510
675,408.839
2.24
-77.39
4,396.84
23.86
12.31
4,333.74
4,245.03
381.45
50.34
5,939,676.193
675,415.145
1.67
-83.16
4,490.83
25.85
12.40
4,419.02
4,330.31
420.04
58.80
5,939,714.966
675,422.698
2.12
-88.41
4,585.99
27.11
13.39
4,504.19
4,415.48
461.40
68.27
5,939,756.529
675,431.209
1.40
-93.65
4,679.95
30.37
13.79
4,586.57
4,497.86
505.30
78.90
5,939,800.667
675,440.807
3.48
-98.68
4,774.07
32.80
14.51
4,666.74
4,578.03
553.10
90.96
5,939,848.726
675,451.751
2.61
-103.70
4,868.65
35.82
14.05
4,744.85
4,656.14
604.76
104.10
5,939,900.674
675,463.686
3.20
-109.02
4,963.42
38.64
12.37
4,820.30
4,731.59
660.57
117.17
5,939,956.776
675,475.457
3.16
-115.82
5,057.49
41.87
9.54
4,892.09
4,803.38
720.24
128.67
5,940,016.691
675,485.564
3.95
-125.43
5,152.72
45.00
7.16
4,961.24
4,872.53
785.01
138.14
5,940,081.657
675,493.521
3.71
-138.68
5,248.52
48.24
4.50
5,027.04
4,936.33
854.26
145.16
5,940,151.049
675,498.935
3.94
-155.76
5,341.53
50.55
3.01
5,087.57
4,998.86
924.71
149.77
5,940,221.588
675,501.903
2.77
-175.53
5,436.33
50.88
3.80
5,147.59
5,058.88
997.96
154.13
5,940,294.910
675,504.557
0.73
-196.49
5,530.29
50.89
3.11
5,206.87
5,118.16
1,070.73
158.53
5,940,367.757
675,507.256
0.57
-217.25
5,627.02
50.83
3.19
5,267.93
5,179.22
1,145.64
162.65
5,940,442.738
675,509.635
0.09
-238.99
5,719.22
50.79
2.52
5,326.19
5,237.48
1,217.01
166.21
5,940,514.168
675,511.533
0.56
-260.06
5,813.84
50.79
1.54
5,386.01
5,297.30
1,290.28
168.80
5,940,587.471
675,512.425
0.80
-282.68
5,909.06
48.87
1.46
5,447.43
5,358.72
1,363.01
170.71
5,940,660.223
675,512.638
2.02
-305.76
6,002.72
46.54
2.32
5,510.45
5,421.74
1,432.25
172.98
5,940,729.489
675,513.301
2.58
-327.30
10/19/2017 12'44:02PM Page 5 COMPASS 5000.1 Build 81D
BP
by Final Survey Report �JUGHES
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Ml 14-16
TVD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Project:
Prudhoe Bay
MD Reference:
14-166 Actual @ 88.71 usft (Actual P272)
She:
PB DS 14
TVD
(usft)
5,576.85
5,647.08
5,719.91
TVDSS
(usft)
5,488.14
5,558.37
5,631.20
Well:
14-16
North Reference:
True
Di -eq
(•1100usft)
3.06
2.71
2.94
V. Sec
(usft)
-347.14
-365.44
-381.80
Survey Calculation Method:
Minimum Curvature
Wellbore:
14-168
Database:
EDM RSK-Alaska PROD -ANCP1
ne.u...•
1d-1613
675,524.557
675,529.056
675,534.434
675,540.769
675,547.578
2.87
3.44
2.91
3.21
2.83
Survey
MD
(usft)
6,096.84
6,192.01
6,286.87
Inc
(•)
43.71
41.18
38.49
Azi(azimuth)
(•)
3.09
3.82
4.97
TVD
(usft)
5,576.85
5,647.08
5,719.91
TVDSS
(usft)
5,488.14
5,558.37
5,631.20
NIS
(usft)
1,498.86
1,562.97
1,623.55
ENV
(usft)
176.12
179.98
184.62
Northing
(usft)
5,940,796.156
5,940,860.330
5,940,920.998
Easting
(usft)
675,514.887
675,517.255
675,520.483
Di -eq
(•1100usft)
3.06
2.71
2.94
V. Sec
(usft)
-347.14
-365.44
-381.80
6,381.96
6,475.26
6,569.99
6,664.93
6,758.20
35.81
32.63
30.06
27.11
24.57
5.86
6.68
8.59
10.19
11.84
5,795.70
5,872.84
5,953.74
6,037.10
6,121.03
5,706.99
5,784.13
5,865.03
5,948.39
6,032.32
1,680.71
1,732.86
1,781.70
1,826.51
1,866.41
190.02
195.74
202.26
209.64
217.38
5,940,978.268
5,941,030.533
5,941,079.503
5,941,124.473
5,941,164.541
675,524.557
675,529.056
675,534.434
675,540.769
675,547.578
2.87
3.44
2.91
3.21
2.83
-396.27
-408.74
419.32
-427.71
-434.08
6,852.44
6,944.90
7,041.46
7,133.92
7,228.09
21.41
18.75
15.99
13.17
10.33
13.20
15.30
19.42
23.98
31.12
6,207.78
6,294.61
6,386.76
6,476.24
6,568.43
6,119.07
6,205.90
6,298.05
6,387.53
6,479.72
1,902.34
1,933.11
1,960.63
1,982.27
1,999.30
225.32
233.10
241.62
250.14
258.86
5,941,200.646
5,941,231.585
5,941,259.293
5,941,281.123
5,941,298.355
675,554.690
675,561.747
675,569.624
675,577.634
675,585.961
3.40
2.98
3.13
3.29
3.38
-438.90
-442.12
-443.53
-442.92
440.55
7,323.43
741792
7,511.63
7,606.20
7,701.93
7.90
5.51
4.33
4.44
6.33
39.36
49,97
71.21
115.96
147.59
6662.56
6,756.40
6,849.78
6,944.10
7,039.42
6,573.85
6,667.69
6,761.07
6,855.39
6,950.71
2,011.69
2,019.63
2,023.66
2,023.21
2,017.13
267.44
275.03
281.83
288.50
294.66
5,941,310.936
5,941,319.050
5,941,323.240
5,941,322.943
5,941,317.009
675,594.245
675,601.651
675,608.350
675,615.031
675,621 332
2.89
2.84
2.30
3.53
3.60
436.73
432.31
-427.30
-420.88
-413.01
7.796,28
7,891.04
7,986.41
8,080.51
8,175.40
8.37
10.44
12.75
15.51
18.67
162.19
166.50
169.74
173.86
172.52
7,133.00
7,226.48
7,319.90
7,411.14
7,501.83
7,044.29
7,137.77
7,231.19
7,322.43
7,413.12
2,006.20
1,991.28
1,972.52
1,949.79
1,922.11
299.55
303.66
307.56
310.75
314.09
5,941,306.195
5,941,291.380
5,941,272.716
5,941,250.066
5,941,222.473
675,626.474
675,630.934
675,635.261
675,638.984
675,642.962
2.92
2.31
2.52
3.12
3.36
-404.68
-395.71
-385.63
-374.86
-362.26
8,269.84
8,363.41
8,459.65
8,553.79
21.61
24.19
26.13
28.69
173.00
172.46
172.61
171.33
7,590.49
7,676.68
7,763.78
7,847.35
7,501.78
7,587.97
7,675.07
7,758.64
1,889.86
1,853.74
1,813.18
1,770.27
318.18
322.79
328.11
334.18
5,941,190.323
5,941,154.330
5,941,113.899
5,941,071.151
675,647.799
675,653.254
675,659.509
675,666.579
3.12
2.77
2.02
2.79
-347.38
-330.69
-311.82
-291.44
101192017 12:44:02PM Page 6 COMPASS 5000.1 Build 81D
e
BP
Final Survey Report
BAF�UU,FS
Company:
North America -ALASKA - BP
Local Coordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-16B Actual @ 88.71 usft (Actual P272)
Site:
PB DS 14
MD Reference:
14-16BActual @ 88.7lusft (Actual P272)
Well:
14-16
North Reference:
True
Wellbore:
14-16B
Survey Calculation Method:
Minimum Curvature
Design:
14-166
Database:
EDM R5K - Alaska PROD - ANCPI
Survey
MD
Inc
AN (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
8,648.86
29.99
172.75
7,930.22
7,841.51
1,724.14
340.62
5,941,025.184
675,674.089
1.55
-269.61
8,741.64
30.05
172.85
8,010.55
7,921.84
1,678.09
346.44
5,940,979.283
675,680.976
0.08
-248.40
8,835.91
30.05
172.79
8,092.15
8,003.44
1,631.25
352.34
5,940,932.600
675,687.963
0.03
-226.83
8,930.07
30.06
172.59
8,173.65
8,084.94
1,584.48
358.34
5,940,885.980
675,695.050
0.11
-205.20
9,024.59
30.01
172.74
8,255.48
8,166.77
1,537.55
364.38
5,940,839.213
675,702.179
0.10
-183.47
9,119.24
30.02
172.11
8,337.44
8,248.73
1,490.62
370.62
5,940,792.442
675,709.510
0.33
-161.56
9,214.04
30.00
172.40
8,419.53
8,330.82
1,443.64
377.01
5,940,745.624
675,716.991
0.15
-139.48
9,308.46
29.96
172.09
8,501.32
8,412.61
1,396.89
383.37
5,940,699.038
675,724.442
0.17
-117.51
9,402.82
30.00
172.86
8,583.05
8,494.34
1,350.15
389.55
5,940,652.453
675,731.702
0.41
-95.72
9,437.08
30.00
172.95
8,612.72
8,524.01
1,333.15
391.66
5,940,635.509
675,734.213
0.13
-87.92
9,476.00
31.94
172.60
8,646.09
8,557.38
1,313.28
394.19
5,940,615.708
675,737.195
5.00
-78.76
INTERMEDIATE CASING
2
9,523.99
34.33
172.21
8,686.27
8,597.56
1,287.28
397.66
5,940,589.798
675,741.269
5.00
-66.60
9,556.20
37.24
173.39
8,712.40
8,623.69
1,268,60
400.01
5,940,571.175
675,744.056
9.28
-58.00
9,585.93
39.94
174.87
8,735.64
8,646.93
1,250.15
401.90
5,940,552.781
675,746.374
9.60
-49.92
9,617.37
42.36
171.09
8,759.31
8,670.60
1,229.63
404.44
5,940,532.325
675,749.394
11.04
40.51
9,650.86
45.75
169.42
8,783.38
8,694.67
1,206.69
408.39
5,940,509.480
675,753.877
10.70
-28.95
9,681.86
49.26
169.08
8,804.32
8,715.61
1,184.23
412.66
5,940,487.134
675,758.663
11.35
-17.26
9,713.09
53.21
168.64
8,823.87
8,735.16
1,160.35
417.36
5,940,463.365
675,763.923
12.70
-4.67
9,747.48
57.06
169.65
8,843.52
8,754.81
1,132.64
422.67
5,940,435.790
675,769.873
11.45
9.80
9,779.60
60.24
172.77
8,860.23
8,771.52
1,105.54
426.85
5,940,408.795
675,774.680
12.91
22.99
9,809.37
63,03
174.75
8,874.38
8,785.67
1,079.50
429.69
5,940,382.833
675,778.126
11.05
34.57
9,841.00
66.28
175.51
8,887.92
8,799.21
1,051.02
432.11
5,940,354.421
675,781.211
10.50
46.58
9,872.77
69.97
174.11
8,899.75
8,811.04
1,021.67
434.78
5,940,325.137
675,784.564
12.31
59.13
9,902.32
73.20
174.43
8,909.08
8,820.37
993.77
437.58
5,940,297.319
675,788.010
10.98
71.30
9,934.79
77.59
173.49
8,917.27
8,828.56
962.54
440.89
5,940,266.168
675,792.043
13.81
85.10
9,965.82
81.19
173.10
8,922.98
8,834.27
932.25
444.45
5,940,235.975
675,796.308
11.67
98.80
10/19/2017 1244 02P Page 7 COMPASS 5000.1 Build BID
J
BP
BAKER
gUGHES
by Final Survey Report �Eomoaw
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 14-16
TVD Reference:
14-16B Actual @ 88.71 usft (Actual P272)
Project:
Prudhoe Bay
MD Reference:
14-16B Actual @ 88.71 usft (Actual P272)
Site:
PB DS 14
TVD
(usft)
8,926.70
8,928.58
8,928.58
8,926.65
8,922.16
TVDSS
(usft)
8,837.99
8,839.87
8,839.87
8,837.94
6,833.45
Well:
1416
North Reference:
True
DLeg
(°1100usft)
11.57
12.73
9.19
13.59
14.06
V. Sec
(usft)
112.42
126.97
139.99
154.22
168.34
Survey Calculation Method:
Minimum Curvature
Wellbore:
14168
Database:
EDM RSK- Alaska PROD-ANCP1
Deal...
14-16B
675,821.414
675,825.000
12.44
10.38
Survey
MD
(usft)
9,996.10
10,028.76
10,058.05
10,090.32
10,123.18
Inc
(')
84.69
86.72
91.30
95.55
100.17
Azi (azimuth)
(°)
172.98
174.00
173.23
174.32
174.24
TVD
(usft)
8,926.70
8,928.58
8,928.58
8,926.65
8,922.16
TVDSS
(usft)
8,837.99
8,839.87
8,839.87
8,837.94
6,833.45
NIS
(usft)
902.43
870.04
840.93
808.92
776.54
ENV
(usft)
448.09
451.79
455.05
458.54
461.78
Northing
(usft)
5,940,206.246
5,940,173.954
5,940,144.934
5,940,113.011
5,940,080.717
Easting
(usft)
675,800.641
675,805.089
675,809.022
675,813.258
675,817.253
DLeg
(°1100usft)
11.57
12.73
9.19
13.59
14.06
V. Sec
(usft)
112.42
126.97
139.99
154.22
168.34
10,154.78
10,777.98
103.89
105.70
172.94
171.30
8,915.57
8,909.65
8,826.86
8,820.94
745.83
723.63
465.23
468.30
5,940 050.100
5,940,027.981
675,821.414
675,825.000
12.44
10.38
182.08
192.56
14-168 KOP- WS
10,209.70
1D,239.34
10,270.75
103.37
101.15
99.58
172.21
173.20
171.77
8,901.69
8,895.39
8,889.74
8,812.98
8,806.68
8,801.03
693.23
664.50
633.87
472.70
476.38
480.42
5,939,997.689
5,939,969.057
5,939,938.531
675,830.110
675,834.454
675,839.206
7.85
6.7.711
6
207.10
220.38
234.65
10,302.23
10,334.48
10,365.37
10,397.72
10,429.04
96.94
98.67
98.20
98.11
98.44
169.35
166.82
163.13
159.33
155.82
8,884.67
8,879.74
8,875.20
8,870.61
8,866.10
8,795.96
8,791.03
8,786.49
8,781.90
8,777.39
603.22
572.04
542.54
512.22
483.58
485.52
492.10
500.02
510.32
522.14
5,939,908.014
5,939,876.997
5,939,847.685
5,939,817.621
5,939,789.260
675,845.014
675,852.316
675,860.920
675,871.924
675,884.408
7.85
7.80
11.91
11.63
11.14
249.92
266.77
284.30
304.35
325.26
10,459.69
10,492.31
10,522.48
10,553.98
10,585.02
99.69
100.41
101.85
104.78
107.49
152.29
148.35
147.31
144.68
143.14
8,861.27
8,855.58
8,849.76
8,842.50
8,833.87
8,772.56
8,766.87
8,761.05
8,753.79
8,745.16
456.36
428.46
403.41
378.00
353.91
535.38
551.28
567.04
584.18
601.74
5,939,762.365
5,939,734.844
5,939,710.162
5,939,685.160
5,939,661.483
675,898.274
675,914.818
675,931.155
675,948.877
675,966.991
12.08
12.10
5.85
12.35
9.95
347.01
371.49
394.87
419.66
444.40
10,616.80
10,646.91
10,680.13
10,711.76
10,741.25
111.32
113.15
113.28
113.57
113.98
141.79
141.66
141.99
142.01
140.94
8,823.32
8,811.92
8,798.83
8,786.26
8,774.37
8,734.61
8,723.21
8,710.12
8,697.55
8,685.66
330.14
308.26
284.26
261.39
240.28
619.99
637.25
656.12
673.99
690.80
5,939,638.149
5,939,616.679
5,939,593.125
5,939,570.678
5,939,549.963
675,985.792
676,003.559
676,022.981
676,041.375
676,058.669
12.70
6.09
0.99
0.92
3.60
469.69
493.39
519.33
543.94
566.96
10,775.06
113.39
142.66
8,760.78
8,672.07
215.94
709.95
5,939,526.085
676,078.374
4.97
593.27
101192017 12'44:02PM Page 8 COMPASS 5000.1 Build 81D
BP
Final Survey Report
BAF�UGHES
E -p.,
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 14-16 '
project:
Prudhoe Bay
TVD Reference:
14-16B Actual (a3 88.71usft (Actual P272)
Site:
PS DS 14
MD Reference:
14-16B Actual @ 88.7lusft (Actual P272)
Well:
14-16
North Reference:
True
Wellbore:
14-168
Survey Calculation Method:
Minimum Curvature
Design:
14-166
Database:
EDM R5K-Alaska PROD -ANCP1
Survey
MD
Inc
AS(aaimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V,Sec(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft
(usft)
10,807.79
112.77
142.13
8,747.95
8,659.24
192.09
728.32
5,939,502.667
676,097.296
2.41
618.70
10,836.99
111.88
142.58
8,736.86
8,648.15
170.70
744.82
5,939,481.670
676,114.285
3.36
641.51
10,869.44
109.78
142.67
8,725.32
8,636.61
146.60
763.23
5,939,458.006
676,133.249
6.48
667.06
10,900.77
106.93
142.86
8,715.46
8,626.75
122.93
781.22
5,939,434.760
676,151.785
9.11
692.06
10,930.67
104.13
143.38
8,707.45
8,618.74
99.89
798.50
5,939,412.128
676,169.601
9.51
716.18
10,963.68
101.21
143.33
6,700.21
8,611.50
74.05
817.72
5,939,386.746
676,189.416
8.85
743.08
10,993.06
98.12
143.70
8,695.28
8,606.57
50.77
834.94
5,939,363.870
676,207.171
10.59
767.23
11,025.45
94.91
144.52
8,691.61
8,602.90
24.70
853.80
5,939,338.250
676,226.634
10.22
793.87
11,057.75
91.87
145.26
8,689.70
8,600.99
-1.68
672.35
5,939,312.316
676,245.783
9.69
820.31
11,090.21
88.83
144.08
8,689.50
8,600.79
-28.15
891.12
5,939,286.284
676,265.161
10.05
847.00
11,121.29
86.59
142.92
8,690.74
8,602.03
-53.12
909.59
5,939,261.760
676,284.206
8.11
872.90
11,152.51
86.69
141.92
8,692.57
8,603.86
-77.81
928.59
5,939,237.511
676,303.781
3.21
899.21
11,184.63
87.46
140.42
8,694.21-
8605.50
-102.80
948.71.
5,939,212.999
676,324.469
5.24
926.65
11,214.03
87.64
139.43
8,695,47
8,606.76
- -125.28
967.62
5,939,190.970
676,343.895
3.42
952.11
11,247.78
88.56
136.82
8,696.59
6,607.88
-150.39
990.13
5,939,166.388
676,366.985
8.20
981.85
11,279.34
89.55
134.69
8,697.11
8,608.40
-173.00
1,012.15
5,939,144.304
676,389.520
7.44
1,010.27
11,309.85
92.40
133.09
8,696.59
8,607,88
-194.14
1,034.13
5,939,123.677
676,411.986
10.71
1,038.16
11,341.12
94.95
131.40
8,694.58
8,605.87
-215.12
1,057.22
5,939,103.243
676,435.563
9.78
1,067.04
11,372.67
95.48
129.26
8,691.71
8,603.00
-235.45
1,081.17
5,939,083.474
676,459.979
6.96
1,096.50
11,401.97
94.77
126.88
8,689.10
8,600.39
-253.45
1,104.15
5,939,066.021
676,483.362
8.45
1,124.24
11,433.27
94.49
125.74
8,686.57
8,597.86
-271.92
1,129.29
5,939,048.139
676,508.923
3.74
1,154.19
11,468.09
90.60
124.53
8,685.02
8,596.31
-291.94
1,157.73
5,939,028.792
676,537.821
11.70
1,187.76
11,498.18
87.49
122.74
8,685.53
8,596.82
-308.60
1,182.77
5,939,012.719
676,563.245
11.92
1,216.99
11,531.32
86.01
120.18
8,687.40
8,598.69
-325.86
1,210.99
5,938,996.114
676,591.857
8.91
1,249.41
11,562.87
66.02
117.17
8,689.60
8,600.69
-340.96
1,238.60
5,938,981.661
676,619.809
9.52
1,280.52
11,592.86
87.13
114.78
8,691.39
8,602.68
-354.07
1,265.51
5,938,969.181
676,647.015
8.77
1,310.29
11,626.88
87.41
112.64
8,693.01
8,604.30
-367.79
1,296.60
5,938,956.191
676,678.412
5.76
1,344.20
1011912 01 7 12:44:02PM Page 9 COMPASS 5000.1 Build 81D
N
BF BA I
0R
by Final Survey Report Grcmpaw
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well 14-16
Depth
Depth
TVD Reference:
1416B Actual @ 88.7lusft (Actual P272)
Project:
Prudhoe Bay
MD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Site:
PS DS 14
4.500
True
Well:
1416
North Reference:
Survey Calculation Method:
Minimum Curvature
Wellbore:
14168
V -i ea
Database:
EDM R5K - Alaska PROD - ANCP1
Casing Points
Measured
Vertical
Casing
Hole
Depth
Depth
Diameter
Diameter
(usft)
(usft) Name
(in)
(in)
Survey
8,690.17 41/2"
4.500
6.125
MD Inc
(usft) (°)
11,658.45
11,685.34
88.21
89.56
Azi (azimuth)
(°)
113.32
113.41
TVD
(usft)
8,594.22
8,694.74
TVDSS
(usft)
8,605.51
8,606.03
NIS
(usft)
-380.16
-390.82
E/W
(usft)
1,325.62
1,350.30
Northing
(usft)
5,938,944.504
5,938,934.419
Easting
(usft)
676,707.711
676,732.631
DLeg
(°/100usft)
2.95
5.03
V. Sec
(usft)
1,375.70
1,402.54
11,719.26
11,780.96
11,875.55
11,968.85
12,064.72
89.99
89.96
89.93
90.11
91.58
112.87
111.94
111.64
111.91
113.27
8,694.87
8,694.90
8,694.99
8,694.96
8,693.54
8,606.16
8,606.19
8,606.28
8,606.25
8,604.83
404.15
-427.67
-462.78
-497.39
-534.21
1,381.49
1,438.54
1,526.37
1,613.01
1,701.51
5,938,921.820
5,938,899.638
5,938,866.580
5,938,833.996
5,938,799.246
676,764.121
676,821.690
676,910.309
676,997.728
677,087.055
2.04
1.51
0.32
0.35
2.09
1,436.41
1,498.05
1,592.60
1,685.85
1,781.61
12,157.43
12,252.57
12,345.76
12,441.56
12,535.06
90.13
89.90
89.96
91.43
89.92
113.32
113.66
114.58
114.43
112.28
8,692.16
8,692.14
8,692.25
8,691.09
8,689.99
8,603.45
8,603.43
8,603.54
8,602.38
8,601.28
-570.87
-608.79
-646.87
-686.60
-723.66
1,786.65
1,873.91
1,958.96
2,046.12
2,131.95
5,938,764.581
5,938,728.701
5,938,692.611
5,938,654.920
5,938,619.869
677,173.020
677,261.128
677,347.038
677,435.095
677,521.754
1.56
0.43
0.99
1.54
2.81
1,874.15
1,969.11
2,062.06
2,157.56
2,250.88
12,630.47
12,709.45
12,750.00
89.99
89.93
89.93
112.76
113.11
113.11
8,690.06
8,690.12
8690.17
8,601.35
8,601.41
8601.46
-760.21
-790.98
-806.90
2;220.08
2,292.82
2,330.11
5,938,585.389
5,938,556.314
5,938,541.271
677,610.709
677,684.137
677,721.790
0.51
0.45
0.00
2,346.20
2,425.08
2,465.57
Projection to TD - 4112"
Casing Points
Measured
Vertical
Casing
Hole
Depth
Depth
Diameter
Diameter
(usft)
(usft) Name
(in)
(in)
12,750.00
8,690.17 41/2"
4.500
6.125
10/192017 12:44:02PM Page 10 COMPASS 5000.1 Build 81D
BP
Final Survey Report
BAF�UGHES
E -,.M
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Site:
PB DS 14
MD Reference:
14-16B Actual @ 88.71 usft (Actual P272)
Well:
14-16
North Reference:
True
Wellbore:
14-16B
Survey Calculation Method:
Minimum Curvature
Design:
14-16B
Database:
EDM R5K - Alaska PROD - ANCPI
Design Annotations
Measured
Depth
(usft)
10,177.96
12,750.00
Vertical Local Coordinates
Depth +Nl-S +El -W
(usft) (usft) (usft)
8,909.65 723,63 468.30
8,690.17 -806.90 2,330.11
Comment
14-16B KOP- WS
Projection to TO
Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes a GE Company
10/192017 12.44: 02PM Page 11 COMPASS 5000.1 Build 81D
. nrvr• an rnar
DEC 1 B J17
BAfCERUGHES C PRINT DISTRIBUTION LIST
a GE company
COMPANY BP EXDloratlon Alaska Inc.
WELL NAME
14-16BPB1
CD/DVD
FIELD
Prudhoe Bay Unit
PRELIM
COUNTY
PRUDHOEBAY
SURVEY
BHI DISTRICT
Alaska
AUTHORIZED BY
Paul Canizares
EMAIL
Paul.Can izares(a)bhoe.com
21 7093
28899
ase sign and return one copy of this transmittal form to:
Exploration (Alaska) Inc. DATA LOGGED
:rotechnical Data Center, L12-1 M.
/%k/201
M. K. BENDEE
R
) E. Benson Blvd.
:horage, Alaska 99508 or AKGDMINTERNAL@bp.com
LOG TYPE GR-RES-DEN-NEU
STK:Image Log
LOG DATE October 16, 2017
TODAYS DATE December 18, 2017
Revision
STATUS Final Replacement: No Details:
Rev. Requested by:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
V
BP NOrth Slope.
EOA, PBOC. PRB-20 (Office 109)
D&C Wells Projeel Aides
Attn: Bentla Glassmeker &Peggy O'Neil
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConocePhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 3-344
700 G Street
Anchorsg4 AK 99510
3 EXsonMobil, Alaska
Attn: Lynda M. Vaskell and/or Lisa Boggs
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska - AOGCC
Attn: Makana Render
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
)NR - Divislon of Oil & Gas ...
kttn: Garret Brown
150 West 7th Avenue, Suite 1100
knehoratm, Alaska 99501
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd,
Anchorage, Alas" 99508
Attn: Gerardo Cedillo
FIELDI
FINAL
CD/DVD
FINAL
PRELIM
LOGS
I
(las, dlis, PDF, META,
I
SURVEY
REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTS
# OF COPIES
# OF COPIES
# OF COPIES
0 1 0 1 1 1 1 1 0
0
1
TOTALS FOR THIS PAGE: 0 2 5 4 0
to Z
�.0 bp
RECEIVED
OEC 1 8 2017
AOGCC
North America - ALASKA - BP
Prudhoe Bay
PB DS 14
14-16
14-16BPB1
500292060871
Design: 14-16BPB1
Final Survey Report
19 October. 2017
BAF IGHES
BAT
GE company
21 7993
28899
BP
by Final Survey Report BAKER
JUHES
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 14
Well:
14-16
Wellbore:
14-16BPBI
Design:
14-165PB1
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
We1114-16
14-16B Actual @ 88.71 usft (Actual P272)
14-16B Actual @ 88.71 usft (Actual P272)
Two
Minimum Curvature
EDM R5K - Alaska PROD - ANCPI
Project Prudhoe Bay, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point
Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor
Site PB DS 14, TR -10-14
Site Position: Northing: 5,939,577.430 usft Latitude: 70° 14'26.346 N
From: Map Basting: 674,150.480 usft Longitude: 148'35'36.726W
Position Uncertainty: 0.00 usft Slat Radius: 0.000 in Grid Convergence: 1.32
Well
14-16, 14-16
Wellbore
14-16BPB1
Magnetics
Model Name Sample Date
Well Position
-NIS 0.00 usft
Northing:
5,939,293.700 usft
Latitude:
70' 14'23.277 N
+E/ -W 0.00 usft
Easting:
675,373.690 usft
Longitude:
1480 35' 1.368 W
Position Uncertainty
0.00 Usti
Wellhead Elevation:
42.16 usft
Ground Level:
41.91 usft
Declination
ACTUAL
Wellbore
14-16BPB1
Magnetics
Model Name Sample Date
46.55
BGGM2017 9/25/2017
Design
14-16BPB1
Audit Notes:
Declination
ACTUAL
Dip Angle
C)
+N/S
(usft)
17.72
46.55
80.95
Version: Phase:
ACTUAL
Vertical Section: Depth From (TVD)
+N/S
(usft)
(usft)
46.55
0.00
Field Strength
(rT)
57,490
Te On Depth:
3,192.71
+E/ -W
Direction
(usft)
V)
0.00
110.00
10/192017 12:39:36PM Page 2 COMPASS 5000.1 Build SID
by
BP
Final Survey Report
8 JUGHES
ErP
Company:
North America -ALASKA - BP
Local Coordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-16B Actual @ 88.71 usft (Actual P272)
Site:
PB DS 14
MD Reference:
14-16B Actual P 88.71 usft (Actual P272)
Well:
14-16
North Reference:
True
Wellbore:
14-16BPB1
Survey Calculation Method:
Minimum Curvature
Design:
14-16BPB1
Database:
EDM R5K-Alaska PROD -ANCP1
Survey Program
From
(usft)
117.71
3,208.00
9,523.99
10,365.38
Date 10/19/2017
To
(usft) Survey (Wellbore)
3,192.71 GYrotlata Gryo (1416)
9,437.08 BHGE ATK MWD 8-1/2"x 9 7/8" (14-16BP
10,293.25 BHGE OTK MWD 61/8"(14-16BPB1)
10,892.20 BHGE ATK MWD 6-1/8'(14-16BPB1)
Tool Name
GYD-CT-CMS
MWD+IFR+MS-WOCA
MWD+IFR+MS-WOCA
MWD+IFR+MS-WOCA
Description
Gyrotlata cont.casing m/s
MWD+ IFR+ Multi Station W/O
MWD + IFR + Multi Station W/O
MWD + IFR + Multi Station W/O
Crustal
Crustal
Crustal
Survey
MD
Inc
Azi(azimuth)
TVD
TVDSS
NIS
FJW
Northing
Easting
DLeg
V. Sec
(usft)
(°)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
46.55
0.00 0.00
46.55
-42.16
0.00
0.00
5,939,293.700
675,373.690
0.00
0.00
117.71
0.16 333.51
117.71
29.00
0.09
-0.04
5,939,293.788
675,373.644
0.22
-0.07
217.71
0.04 75.78
217.71
129.00
0.22
-0.07
5,939,293.921
675,373.612
0.17
-0.14
317.71
0.16 105.18
317.71
229.00
0.19
0.10
5,939,293.897
675,373.781
0.13
0.02
417.71
0.33 127.69
417.71
329.00
-0.02
0.46
5,939,293.693
675,374.149
0.19
0.44
517.71
0.39 112.03
517.71
429.00
-0.32
1.00
5,939,293402
675,374.699
0.11
1.05
617.71
0.41 106.56
617.70
528.99
-0.55
1.66
5,939,293.187
675,375.363
0.04
1.75
717.71
0.40 87.49
717.70
628.99
-0.64
2.35
5,939,293.117
675,376.056
0.13
2.43
817.71
0.36 53.57
817.70
728.99
-0.44
2.95
5,939,293.332
675,376.653
0.22
2.9:
1
917.71
0.32 34.56
917.70
828.99
-0.02
3.36
5,939,293.758
675,377.054
0.12
3.17
J
1,017.71
0.38 31.14
1,017.70
928.99
0.49
3.69
5,939,294.280
675,377.372
0.06
3.30
1,117.71
0.44 38.58
1,117.69
1,028.98
1.08
4.11
5,939,294.873
675,377.769
0.08
3.49
1,217.71
0.36 59.04
1,217.69
1,128.98
1.54
4.61
5,939,295.347
675,378.267
0.16
3.81
1,317.71
0.34 108.89
1,317.69
1,228.98
1.61
5.16
5,939,295.425
675,378.815
0.30
4.30
1,417.71
0.32 137.29
1,417.69
1,328.98
1.30
5.63
5,939,295.135
675,379.292
0.16
4.85
1,517.71
0.18 149.94
1,517.69
1,428.98
0.96
5.90
5,939,294.800
675,379.568
0.15
5.22
1,617.71
0.20 280.30
1,617.69
1,528.98
0.86
5.81
5,939,294.693
675,379.478
0.35
5.17
1,717.71
0.29 232.17
1,717.69
1,628.98
0.73
5.44
5,939,294.560
675,379.109
0.22
4.86
1,817.71
0.33 210.97
1,817.68
1,728.97
0.33
5.09
5,939,294,150
675,378.771
0.12
4.67
1,917.71
0.33 212.92
1,917.68
1,826.97
-0.16
4.79
5,939,293.655
675,378.477
0.01
4.55
1011912017 12'39:36PM Page 3 COMPASS 5000.1 Build 81D
BP BAKER
Lip Final Survey Report qUGHES
%1042 aGEcompa�
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
MD Reference:
14-16B Actual @ 88.71 usft (Actual P272)
Site:
PB DS 14
TVD
TVDSS
Well:
14-16
North Reference:
True
Wellbore:
14-16BPB1
Survey Calculation Method:
Minimum Curvature
Design:
14-16BPB1
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
(usft)
2,017.71
0.27
203.70
2,017.68
1,928.97
-0.61
4.53
5,939,293.192
675,378.237
0.08
4.47
2,117.71
0.36
211.62
2,117.68
2,028.97
-1.10
4.27
5,939,292.702
675,377.989
0.10
4.3'
2,217.71
0.44
209.04
2,217.68
2,128.97
-1.70
3.92
5,939,292.091
675,377.652
0.08
4.27
2,317.71
0.51
184.47
2,317.67
2,228.96
-2.48
3.70
5,939,291.307
675,377.449
0.21
4.33
2,417.71
0.74
173.79
2,417.67
2,328.96
-3.57
3.74
5,939,290.222
675,377.509
0.26
4.73
2,517.71
1.00
167.09
2,517.66
2,428.95
-5.06
4.00
5,939,288.737
675,377.809
0.28
5.49
2,617.71
0.83
167.76
2,617.64
2,526.93
-6.62
4.35
5,939,287.187
675,378.193
0.17
6.35
2,618.71
0.83
167.76
2,618.64
2,529.93
-6.63
4.35
5,939,287.173
675,378.197
0.00
6.36
13 3/8"
2,717.71
0.66
132.61
2,717.64
2,628.93
-7.71
4.93
5,939,286.103
675,378.796
0.48
7.27
2,817.71
1.08
105.35
2,817.62
2,728.91
-8.35
6.26
5,939,285.495
675,380.143
0.58
8.74
2,917.71
5.87
51.37
2,917.42
2,828.71
-5.41
11.17
5,939,288.553
675,384.980
5.31
12.34
3,017.71
9.49
45.41
3,016.51
2,927.80
3.57
21.04
5,939,297.762
675,394.637
3.70
18.55
3,042.71
9.91
45.61
3,041.16
2,952.45
6.53
24.04
5,939,300.783
675,397.572
1.69
20.36
3,067.71
10.57
44.11
3,065.76
2,977.05
9.68
27.18
5,939,304.006
675,400.631
2.85
22.23
3,092.71
10.78
44.13
3,090.32
3,001.61
13.00
30.40
5,939,307.404
675,403.777
0.84
24.12
3,117.71
11.14
43.46
3,114.87
3,026.16
16.43
33.69
5,939,310.911
675,406.985
1.53
26.0'
3,142.71
11.67
41.92
3,139.37
3,050.66
20.07
37.04
5,939,314.622
675,410.250
2.44
27.94
3,167.71
12.16
40.22
3,163.84
3,075.13
23.96
40.43
5,939,318.591
675,413.547
2.41
29.80
12.28
39.67
3,188.27
3,099.56
28.02
43.83
5,939,322.726
675,416.849
0.67
31.60
3,192.71
14.16BPBI TIP
3,199.46
12.33
39.75
3,194.86
3,106.15
29.12
44.74
5,939,323.854
675,417.742
0.83
32.09
9 5/8"
3,208.00
12.40
39.86
3,203.21
3,114.50
30.53
45.92
5,939,325.285
675,418.880
0.83
32.71
14-16SPB1 KOP-
Top of WS
3,216.99
3,128.28
33.01
47.82
5,939,327.811
675,420.724
9.19
33.64
3,222.13
13.19
35.20
14.16BPBI Bottom of WS
10/192017 12:39:36PM Page 4 COMPASS 5000.1 Build 810
b BP BA ER'
P Final Survey Report F�UGHES
cEom�a,
Company:
North America -ALASKA- BP
Local Coordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-16B Actual @ 88.71 us0 (Actual P272)
Site:
PB DS 14
MD Reference:
14-16B Actual @ 88.71 usft (Actual P272)
Well:
14-16
North Reference:
True
Wellbore:
14-16BPB1
Survey Calculation Method:
Minimum Curvature
Design:
14-16BPB1
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi(azimuth)
TVD
TVDSS
NIS
EIW
Northing
Basting
DLeg
V. Sec
(usR) (°)
(°)
(usR)
(usR)
(usft)
lust)
(usft)
(usR)
(°1100us/t)
(usR
3,253.00
13.14
31.46
3,247.05
3,158.34
38.88
51.68
5,939,333.769
675,424.447
2.76
35.21
SV3
3,314.44
13.19
24.00
3,306.88
3,218.17
51.24
58.17
5,939,346.276
675,430.652
2.76
37.14
14-16BPBI Interpolated
Azimuth
3,409.71
13.08
12.00
3,399.67
3,310.96
71.72
64.84
5,939,366.902
675,436.837
2.86
36.40
14-16BPBI Interpolated
Azimuth
3,466.00
13.08
5.53
3,454.50
3,365.79
84.29
66.77
5,939,379.513
675,438.482
2.60
33.92
SV2
3,504.78
13.17
1.10
3,492.27
3,403.56
93.07
67.28
5,939,388.306
675,438.785
2.60
31.39
3,546.64
13.41
357.21
3,533.01
3,444.30
102.69
67.14
5,939,397.916
675,438.416
2.21
27.97
3,642.19
14.92
350.53
3,625.66
3,536.95
125.89
64.57
5,939,421.051
675,435.314
2.33
17.62
3,736.10
16.84
345.55
3,715.99
3,627.28
150.99
59.19
5,939,446.018
675,429.348
2.51
3.98
3,831.76
18.79
345.92
3,807.05
3,718.34
179.36
51.98
5,939,474.205
675,421.484
2.04
-12.49
3,875.00
19.38
347.92
3,847.92
3,759.21
193.13
48.79
5,939,487.896
675,417.969
2.04
-20.21
SVi
3,925.23
20.09
350.10
3,895.20
3,806.49
209.77
45.56
5,939,504.464
675,414.356
2.04
-28.93
4,018.80
20.06
351.92
3,983.08
3,894.37
241.49
40.54
5,939,536.056
675,408.601
0.67
-44.51
4,113.17
21.08
358.43
4,071.45
3,982.74
274.49
37.80
5,939,568.975
675,405.094
2.65
-58.36
4,208.10
22.06
4.45
4,159.74
4,071.03
309.33
38.72
5,939,603.828
675,405.199
2.55
-69.42
4,302.52
22.64
9.80
4,247.08
4,158.37
344.92
43.19
5,939,639.510
675,408.839
2.24
-77.39
4,396.84
23.86
12.31
4,333.74
4,245.03
381.45
50.34
5,939,676.193
675,415.145
1.67
-83.16
4,490.83
25.85
12.40
4,419.02
4,330.31
420.04
58.80
5,939,714.966
675,422.698
2.12
-88.41
4,522.00
26.26
12.73
4,447.02
4,358.31
433.40
61.78
5,939,728.394
675,425.365
1.40
-90.18
UG4
4,567.00
26.86
13.20
4,487.27
4,398.56
453.01
66.29
5,939,748.100
675,429.423
1.40
-92.64
UG4A
4,585.99
27.11
13.39
4,504.19
4,415.48
461.40
68.27
5,939,756.529
675,431.209
1.40
-93.65
4,679.95
30.37
13.79
4,586.57
4,497.86
505.30
78.90
5,939,800.667
675,440.807
3.48
-98.68
10/192017 12:39: 36PM Page 5 COMPASS 5000.1 Build 810
BP
BAKER gUHES
by Final Survey Report GE� m,,
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 14-16
Prudhoe Bay
TVD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Project:
MD Reference:
14-16B Actual @ 88.71 usft (Actual P272)
Site:
PB DS 14
Inc
(°)
32.80
35.51
Azi (azimuth)
(°)
14.51
14.09
Well:
14-16
North Reference:
True
Northing
(usft)
5,939,848.726
5,939,895.187
Easting
(usft)
675,451.751
675,462.445
Survey Calculation Method:
Minimum Curvature
Wellbore:
14-166PBI
Database:
EDM RSK - Alaska PROD - ANCP1
D..Inn.
14-16BPB1
Survey
MD
(usft)
4,774.07
4,859.00
Inc
(°)
32.80
35.51
Azi (azimuth)
(°)
14.51
14.09
TVD
(usft)
4,666.74
4,737.01
TVDSS
(usft)
4,578.03
4,648.30
NIS
(usft)
553.10
599.30
E1W
(usft)
90.96
102.73
Northing
(usft)
5,939,848.726
5,939,895.187
Easting
(usft)
675,451.751
675,462.445
DLeg
(°1100usft)
2.61
3.20
V. Sec
(usft)
-103.70
-108.4,
UG3
4,868.65
35.82
14.05
4,744.85
4,656.14
604.76
104.10
5,939,900.674
675.463.686
3.20
-109.02
4,963.42
5,057.49
38.64
41.87
12.37
9.54
4,820.30
4,892.09
4,731.59
4,803.38
660.57
720.24
117.17
128.67
5,939,956.776
5,940,016.691
675,475.457
675,485.564
3.16
3.95
-115.82
-125.43
5,152.72
45.00
7.16
4,961.24
4,872.53
785.01
138.14
5,940,081.657
675,493.521
3.71
-138.68
5,248.52
48.24
4.50
5,027.04
4,938.33
854.26
145.16
5,940,151.049
675,498.935
3.94
-155.76
5,341.53
50.55
3.01
5,087.57
4,998.86
924.71
149.77
5,940,221.588
675,501.903
2.77
-175.53
5,436.33
50.88
3.80
5,147.59
5,058.88
997.96
154.13
5,940,294.910
675,504.557
0.73
-196.49
5,530.29
50.89
3.11
5,206.87
5,118.16
1,070.73
158.53
5,940,367.757
675,507.256
0.57
-217.25
5,596.00
50.85
3.16
5,248.34
5,159.63
1,121.62
161.31
5,940,418.700
675,508.861
0.09
-232.03
UG7
5,627.02
50.83
3.19
5,267.93
5,179.22
1,145.64
162.65
5,940,442.738
675,509.635
0.09
-238.89
5,719.22
5,813.84
50.79
50.79
2.52
1.54
5,326.19
5,386.01
5,237.48
5,297.30
1,217.01
1,290.28
166.21
168.80
5,940,514.168
5,940,587.471
675,511.533
675,512.425
0.56
0.80
-260.06
-282.68
5,909.06
48.87
1.46
5,447.43
5,358.72
1,363.01
170.71
5,940,660.223
675,512.638
2.02
-305.76
6,002.72
46.54
2.32
5,510.45
5,421.74
1,432.25
172.98
5,940,729.489
675,513.301
2.58
-327.3k
6,096.84
43.71
3.09
5,576.85
5,488.14
1,498.66
176.12
5,940,796.156
675,514.887
3.06
-347.14
6,192.01
41.18
3.82
5,647.08
5,558.37
1,562.97
179.98
5,940,860.330
675,517.255
2.71
-365.44
6,286.87
38.49
4.97
5,719.91
5,631.20
1,623.55
184.62
5,940,920.998
675,520.483
2.94
-381.80
6,365.00
36.29
5.69
5,781.99
5,693.28
1,670.78
189.02
5,940,968.318
675,523.784
2.87
-393.82
WEST SAK 2
6,381.96
35.81
5.86
5,795.70
5,706.99
1,680.71
190.02
5,940,978.268
675,524.557
2.87
-396.27
6,475.26
32.63
6.68
5,872.84
5,784.13
1,732.86
195.74
5,941,030.533
675,529.056
3.44
-408.74
6,569.99
30.06
8.59
5,953.74
5,865.03
1,781.70
202.26
5,941,079.503
675,534.434
2.91
419.32
6,664.93
27.11
10.19
6,037.10
5,948.39
1,826.51
209.64
5,941,124.473
675,540.769
3.21
427.71
10/192017 12:39:36PM Page 6 COMPASS 5000.1 Build 81D
by BP
Final Survey Report B F UGHES
Company:
North America -ALASKA - BP
Local Co-ordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-168 Actual @ 88.71 usfl (Actual P272)
Site:
PB DS 14
MD Reference:
14-16B Actual @ 88.71 usfl (Actual P272)
Well:
14-16
North Reference:
True
Wellbore:
14-16BPB1
Survey Calculation Method:
Minimum Curvature
Design:
14-16BPB1
Database:
EDM R5K - Alaska PROD - ANCPI
Survey
MD
Inc
AS (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usfl)
(I
(ry
(usfl)
(usfl)
(usft)
(usR)
(usfl)
(usR)
(°I100usft)
(usR)
6,758.20
24.57
11.84
6,121.03
6,032.32
1,866.41
217.38
5,941,164.541
675,547.578
2.83
-434.Ot
6,762.00
24.44
11.89
6,124.49
6,035.78
1,867.95
217.70
5,941,166.091
675,547.866
3.40
-434.31
WEST SAK 1
6,852.44
21.41
13.20
6,207.78
6,119.07
1,902.34
225.32
5,941,200.646
675,554.690
3.40
-438.90
6,923.00
19.38
14.75
6,273.91
6,185.20
1,926.20
231.25
5,941,224.636
675,560.055
2.98
-441.50
CMJ
6944.90
18.75
15.30
6,294.61
6,205.90
1,933.11
233.10
5,941,231.585
675,561.747
2.98
-442.12
7,041.46
15.99
19.42
6,386.76
6,298.05
1,960.63
241.62
5,941,259.293
675,569.624
3.13
-443.53
7,133.92
13.17
23.98
6,476.24
6,387.53
1,982.27
250.14
5,941,281.123
675,577.634
3.29
-442.92
7,228.09
10.33
31.12
6,568.43
6,479.72
1,999.30
258.86
5,941,298.355
675,585.961
3.38
-440.55
7,323.43
7.90
39.36
6,662.56
6,573.85
2,011.69
267.44
5,941,310.936
675,594.245
2.89
-436.73
7,390.00
6.19
45.99
6,728.63
6,639.92
2,017.72
272.92
5,941,317.093
675,599.587
2.84
-433.64
CM2
7,417.92
5.51
49.97
6,756.40
6,667.69
2,019.63
275.03
5,941,319.050
675,601.651
2.84
-432.31
7,511.63
4.33
71.21
6,849.78
6,761.07
2,023.66
281.83
5,941,323.240
675,608.350
2.30
-427.30
7,606.20
4.44
115.96
6,944.10
6,855.39
2,023.21
288.50
5,941,322.943
675,615.031
3.53
-420.88
7,701.93
6.33
147.59
7,039.42
6,950.71
2,017.13
294.66
5,941,317.009
675,621.332
3.60
-413.01
7,796.28
8.37
162.19
7,133.00
7,044.29
2,006.20
299.55
5,941,306.195
675,626.474
2.92
-404.68
7,891.04
10.44
166.50
7,226.48
7,137.77
1,991.28
303.66
5,941,291.380
675,630.934
2.31
-395.71
7,986.41
12.75
169.74
7,319.90
7,231.19
1,972.52
307.56
5,941,272.716
675,635.261
2.52
-385.63
8,001.00
13.17
170.49
7,334.12
7,245.41
1,969.30
308.12
5,941,269.506
675,635.897
3.12
-384.00
CMI
8,080.51
15.51
173.86
7,411.14
7,322.43
1,949.79
310.75
5,941,250.066
675,638.984
3.12
-374.86
8,175.40
18.67
172.52
7,501.83
7,413.12
1,922.11
314.09
5,941,222.473
675,642.962
3.36
-362.26
8,269.84
21.61
173.00
7,590.49
7,501.78
1,889.86
318.18
5,941,190.323
675,647.799
3.12
-347.38
8,363.41
24.19
172.46
7,676.68
7,587.97
1,853.74
322.79
5,941,154.330
675,653.254
2.77
-330.69
8,459.65
26.13
172.61
7,763.78
7,675.07
1,813.18
328.11
5,941,113.899
675,659.509
2.02
-311.82
101192017 12 39 36P Page 7 COMPASS 5000.1 Build 81D
BP
by Final Survey Report BAKER
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
MD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Site:
PB DS 14
Inc
(')
26.79
Azi (azimuth)
(')
172.26
Well:
1416
North Reference:
True
Northing
(usft)
5,941,103.181
Survey Calculation Method:
Minimum Curvature
Wellbore:
14-16BP81
HRZ
8,553.79
8,648.86
8,682.00
28.69
29.99
30.01
171.33
172.75
172.79
141613PB1
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
(usft)
8,484.00
Inc
(')
26.79
Azi (azimuth)
(')
172.26
TVD
(usft)
7,785.58
TVDSS
(usft)
7,696.87
NIS
(usft)
1,802.42
ENV
(usft)
329.53
Northing
(usft)
5,941,103.181
Easting
(usft)
675,661.188
DLeg
r1leousft)
2.79
V. Sec
(usft)
-306.80
HRZ
8,553.79
8,648.86
8,682.00
28.69
29.99
30.01
171.33
172.75
172.79
7,847.35
7,930.22
7,958.92
7,758.64
7,641.51
7,870.21
1,770.27
1,724.14
1,707.70
334.18
340.62
342.70
5,941,071.151
5,941,025.184
5,941,008.799
675,666.579
675,674.089
675,676.557
2.79
1.55
0.08
-291.44
-269.61
-262.03
KING
8,741.64
30.05
172.85
8,010.55
7,921.84
1,678.09
346.44
5,940,979.283
675,680.976
0.08
-248.40
8,835.91
8,930.07
9,024.59
9,119.24
9,214.04
30.05
30.06
30.01
30.02
30.00
172.79
172.59
172.74
172.11
172.40
8,092.15
8,173.65
8,255.48
8,337.44
8,419.53
8,003.44
8,084.94
8,166.77
8,248.73
8,330.82
1,631.25
1,584.48
1,537.55
1,490.62
1,443.64
352.34
358.34
364.38
370.62
377.01
5,940,932.600
5,940,885.980
5,940,839.213
5,940,792.442
5,940,745.624
675,687.963
675,695.050
675,702.179
675,709.510
675,716.991
0.03
0.11
0.10
0.33
0.15
-226.83
-205.20
-183.47
-161.56
-139.48
9,308.46
9,402.82
29.96
30.00
172.09
172.86
8,501.32
8,583.05
8,412.61
8,494.34
1,396.89
1,350.15
383.37
389.55
5,940,699.038
5,940,652.453
675,724.442
675,731.702
0.17
0.41
-117.51
-95.72
9,437.06
9,475.00
30.00
31.89
172.95
172.61
8,612.72
8,645.24
8,524.01
8,556.53
1,333.15
1,313.80
391.66
394.12
5,940,635.509
5,940,616.230
675,734.213
675,737.115
0.13
5.00
-87.92
-79.00
TSGR
9,476.00
31.94
172.60
8,646.09
8,557.38
1,313.28
394.19
5,940,615.708
675,737.195
5.00
-78.7
INTERMEDIATE
CASING 2
9,507.00
33.48
172.34
8,672.17
8.583.46
1,296.67
396.38
5,940,599.157
675,739.777
5.00
-71.01
TSHU
9,523.99
34.33
172.21
8,686.27
8,597.56
1,287.28
397.66
5,940,589.798
675,741.269
5.00
-66.60
9,556.20
9,585.93
37.24
39.94
173.39
174.87
8,712.40
8,735.64
8,623.69
8,646.93
1,268.60
1,250.15
400.01
401.90
5,940,571.175
5,940,552.781
675,744.056
675,746.374
9.28
9.60
-58.00
-49.92
9,599.00
40.93
173.25
8,745.59
8,656.88
1,241.72
402.78
5,940,544.373
675,747.448
11.04
-46.21
TSAD
9,617.37
42.36
171.09
8,759.31
8,670.60
1,229.63
404.44
5,940,532.325
675,749.394
11.04
40.51
9,650.86
45.75
169.42
8,783.38
8,694.67
1,206.69
408.39
5,940,509.480
675,753.877
10.70
-28.95
1011912017 12:39:36PM Page 8 COMPASS 5000.1 Build 81D
1#2
BP
Final Survey Report
BAF�UGHES
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Site:
PB DS 14
MD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Well:
14-16
North Reference:
True
Wellbore:
14-16BPB1
Survey Calculation Method:
Minimum Curvature
Design:
14-16BPB1
Database:
EDM R5K-Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
9,681.86
49.26
169.08
8,804.32
8,715.61
1,184.23
412.66
5,940,487.134
675,758.663
11.35
-17.21
J
9,713.09
53.21
168.64
8,823.87
8,735.16
1,160.35
417.36
5,940,463.365
675,763.923
12.70
-4.67
9,747.48
57.06
169.65
8,843.52
8,754.81
1,132.64
422.67
5,940,435.790
675,769.873
11.45
9.80
9,779.60
60.24
172.77
8,860.23
8,771.52
1,105.54
426.65
5,940,408.795
675,774.680
12.91
22.99
9,809.37
63.03
174.75
8,874.38
8,785.67
1,079.50
429.69
5,940,382.833
675,778.126
11.05
34.57
9,841.00
66.28
175.51
8,887.92
8,799.21
1,051.02
432.11
5,940,354.421
675,781.211
10.50
46.58
9,872.77
69.97
174.11
8,899.75
8,811.04
1,021.67
434.78
5,940,325.137
675,764.564
12.31
59.13
9,902.32
73.20
174.43
8,909.08
8,820.37
993.77
437.58
5,940,297.319
675,788.010
10.98
71.30
9,934.79
77.59
173.49
8,917.27
8,828.56
962.54
440.89
5,940,266.168
675,792.043
13.81
85.10
9,965.82
81.19
173.10
8,922.98
8,834.27
932.25
444.45
5,940,235.975
675,796.308
11.67
98.80
9,996.10
84.69
172.98
8,926.70
8,837.99
902.43
448.09
5,940,206.246
675,800.641
11.57
112.42
10,028.76
88.72
174.00
8,928.58
8,839.87
670.04
451.79
5,940,173.954
675,805.089
12.73
126.97
10,058.05
91.30
173.23
8,928.58
8,839.87
840.93
455.05.
5,940,144.934
675,809.022
9.19
139.99
10,090.32
95.55
174.32
8,926.65
8,837.94
808.92
458.54
5,940,113.011
675,813.258
13.59
154.22
10,123.18
100.17
174.24
8,922.16
6,833.45
776.54
461.78
5,940,D80.717
675,817.253
14.06
168.34
10,154.78
103.89
172.94
8,915.57
8,826.86
745.83
465.23
5,940,050.100
675,821.414
12.44
182.0(
10,183.80
107.11
171.26
8,907.82
8,819.11
718.13
469.07
5,940,022.504
675,825.896
12.42
195.16
1
10,217.81
111.31
171.01
8,896.63
8,807.92
686.41
474.02
5,939,990.904
675,831.580
12.37
210.66
10,249.58
113.55
171.02
8,884.51
8,795.80
657.40
478.60
5,939,962.016
675,836.839
7.05
224.89
10,281.72
113.65
170.93
8,871.64
8,782.93
628.32
483.22
5,939,933.046
675,842.134
0.40
239.18
10,293.25
113.79
170.51
8,867.00
8,778.29
617.90
484.92
5,939,922.672
675,844.078
3.55
244.35
10,365.38
113.43
170.43
8,838.11
8,749.40
552.72
495.87
5,939,857.768
675,856.533
0.51
276.92
10,427.97
112.49
171.08
8,813.70
8,724.99
495.84
505.12
5,939,801.121
675,867.111
1.78
305.07
10,459.45
111.93
170.64
8,801.80
8,713.09
467.06
509.75
5,939,772.464
675,872.408
2.20
319.27
10,491.50
110.95
170.98
8,790.08
8,701.37
437.61
514.52
5,939,743.136
675,877.856
3.21
333.82
10,523.19
110.17
170.77
8,778.95
8,690.24
408.32
519.22
5,939,713.959
675,883.241
2.54
348.26
10,554.52
109.45
170.59
8,768.34
8,679.63
379.23
524.00
5,939,684.993
675,888.690
2.36
362.69
10/192017 1239: 36PM Page 9 COMPASS 5000.1 Build 810
BP
by Final Survey Report �I U E
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 14
Well:
14-16
Wellbore:
14-16BPB1
Deman:
14-16BPB1
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 14-16
14-168 Actual @ 88.71 usft (Actual P272)
14-168 Actual @ 88.71 usft (Actual P272)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
Aft (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Seating
DLeg
V. Sec
(usft)
(')
(')
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
('1100usft)
(usft)
10,586.36
108.66
170.12
8,757.94
8,669.23
349.56
529.04
5,939,655.451
675,894.421
2.85
377.58
10,617.16
108.63
166.69
8,748.09
8,659.38
320.98
534.90
5,939,627.014
675,900.948
10.55
392.8
10,647.40
108.69
164.87
8,738.42
8,649.71
293.21
541.94
5,939,599.416
675,908.629
5.71
408.98
10,680.29
109.01
162.18
8,727.79
8,639.08
263.36
550.77
5,939,569.787
675.918.146
7.80
427.48
8,629.19
235.54
560.30
5,939,542.194
675,928.320
7.18
445.95
10,711.32
108.15
160.01
8,717.90
10,741.86
107.47
158.21
8,708.56
8,619.85
208.38
570.67
5,939,515.281
675,939.317
6.04
464.96
10,774.14
105.57
156.64
8,699.38
8,610.67
179.80
582.55
5,939,486.994
675,951.859
7.51
485.92
10,809.94
103.13
155.32
8,690.51
8,601.80
148.13
596.67
5,939,455.658
675,966.710
7.69
510.02
10,836.33
101.12
154.69
8,684.96
8,596.25
124.75
607.57
5,939,432.536
675,978.152
7.97
528.26
10,867.91
99.32
153.93
8,679.36
6,590.65
96.74
621.04
5,939,404.853
675,992.271
6.17
550.50
10,892.20
98.04
152.67
8,675.69
8,586.98
75.29
631.83
5,939,383.661
676,003.556
7.35
567.97
10,946.00
98.04
152.67
8,668.17
8,579.46
27.96
656.29
5,939,336.921
676,029.106
0.00
607.14
Projection to TO
9,476.00 8,646.09 INTERMEDIATE CASING 2 7.000 9.875
3,199.46 3,194.86 9 5/8" 9.625 12.250
101192017 12:39:36PM Page 10 COMPASS 5000.1 Build 81D
by Final SuBe Report
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 14
Well:
14-16
Wellbore:
14-16BPB1
Design:
14-16BPBl
Formations
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Measured
Vertical
Measured
Dip
Depth
Depth
(usft)
Dip Direction
(usft)
(usft)
Name
Lfthology
6,365.00
5,781.99
WEST SAK 2
3,306.88
4,567.00
4,487.27
UG4A
Clay/Sandstone
9,507.00
8,672.17
TSHU
27.96
5,596.00
5,248.34
UG1
3,875.00
3,847.92
SV1
SAND
7,390.00
6,728.63
CM2
3,466.00
3,454.50
SV2
SAND
9,599.00
8,745.59
TSAD
8,484.00
7,785.58
HRZ
6,762.00
6,124.49
WESTSAKI
6,923.00
6,273.91
CM3
4,859.00
4,737.01
UG3
Clay/Sandstone
8,682.00
7,958.92
KNG
8,001.00
7,334.12
CM1
9,475.00
8,645.24
TSGR
4,522.00
4,447.02
UG4
Clay/Sandstone
3,253.00
3,247.05
SV3
SAND
Design Annotations
Measured
Vertical
Depth
Depth
(usft)
(usft)
3,192.71
3,188.27
3,208.00
3,203.21
3,222.13
3,216.99
3,314.44
3,306.88
3,409.71
3,399.67
10,946.00
8,668.17
10/19/2017 12'39.36PM
Local Coordinates
+w -S
•El -W
(usft)
(usft)
Comment
28.02
43.83
14-16BPB1 TIP
30.53
45.92
14-16BPB1 KOP- Top of WS
33.01
47.82
14-16BPB1 Bottom of WS
51.24
58.17
14-16BPB1 Interpolated Azimuth
71.72
64.84
14-16BPB1 Interpolated Azimuth
27.96
656.29
Projection to TD
BA ER
F�UGHES
Well 14-16
14-16B Actual @ 88.71 usft (Actual P272)
14-16BActual @ 88.7lusft (Actual P272)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes a GE Company
Page 11
COMPASS 5000.1 Build 81D
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMIS^'ON
WELL OMPLETION OR RECOMPLETION REPT ,- AND LOG
Ia. Well Status: Oil 0 • Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspentled ❑
tD. Well Class:
20AAC 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One •
Development 10 Exploratory ❑
Service ❑ Stratigraphic Test ❑
2. Operator Name:
6. Date Camp., Susp., or Abend.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
10/24/2017
217-093
3. Address:
7. Date Spudded:
15. API Number:
P.O. Box 196612 Anchorage, AK 99519-6612
9/27/2017
50-029-20608-02-00
4a. Location of Well (Governmental Section):
8. Date TD Reached:
16, Well Name and Number:
10/18/2017
PBU 14-16B
Surface: 1050' FNL, 1083' FEL, Sec. 09, TION, R14E, UM •
9 Ref Elevations KB 88 71
17. Field/Pool(s):
Top of Productive Interval: 263' FSL, 696' FEL, Sec. 04, Tl ON, R14E, UM
GL 41.91 • BF 42.16
PRUDHOE BAY, PRUDHOE OIL -
10. Plug Back Depth(MD/TVD):
18. Property Designation:
Total Depth: 1858' FNL, 1235' FWL, Sec. 10, TION, R14E, UM
12655'18690'
ADL 028312 •
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11, Total Depth (MDfrVD):
19. DNR Approval Number:
Surface: x- 675374 • y- 5939294 • Zone - ASP 4
12750'/ 8690' •
77-043
12. SSSV Depth (MD/TVD):
20Thickness of Permafrost MD/(VD:
TPI: x- 675737 y- 5940616 Zone - ASP 4
Total Depth: x- 677722 y- 5938541 Zone - ASP 4
None
1900' (Approx.)
5. Directional or Inclination Survey: Yes 0 (attached) No ❑
13. Water Depth, if Offshore.
21. Re-drill/Lateral Tap W iximv
MD/TVD:
Submit electronic and printed information per 20 AAC 25.050
N/A (ft MSL)
, 3208'13203' ,
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MWD/GR/RES, MW9/GR/RES /DEN /NEU
23' CASING, LINER AND CEMENTING RECORD
CASING
WT. PER
GRADE
SETTING DEPTH MD SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
AMOUNT
PULLED
TOP
BOTTOM TOP
BOTTOM
20"
94#
H40
47'
127' 47'
127'
30"
300 ax Pemlalrost
13-3/8"
72#
L-80
47'
2618' 47'
2618'
17-1/2"
2600 sx Fondu, 400 ax AS II
9-5/8"
47#
L -SO
45'
3208' 45'
3203'
12-1/4"
500 sx Class'G'
7"
26#
L-113
42'
9476' 42'
8646'
&12"x9.7/8"
403 sx Class'G'
4-1/2"
12.8#
13Cr05
9306'
12748' 8499'
8690'
6-1/8"
186 sx Bi -Modal
24. Open to production or injection? Yes 0 No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number):
GRADE DEPTH SET (MD) PACKER SET (MD/TV
4-1/Z'12.6# 13Cr85 9317 9224'18428'
2-7/8" Gun Diameter, 6 spf
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
11150'- 11225' 8692'- 8696' RECEIVED
11530'- 11550' 8687' - 8689'
Was hydmulicfmcturing used during completion? Yes ❑ No 0
Per 20 AAC 25.283 (i)(2) attach electronic and printed
{1 7
11650'- 11765' 8694'- 8695' NOV 2 0 2017
11865'- 12100' 8695'- 8693'
12200' - 12525' 8692'- 5690'/////----�'����
information
12550'- 12655' 8690'- 8690'
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
AV�����•sNGCC
" I. '- L '"
2100' Freeze Protect w/70 Bbls Diesel
')A: 7E
27. b`- PRODUCTION TEST
Date First Production: November 14, 2017
Method of Operation (Flouring, gas lift, etc.): Gas Lift
Date a Test: 11/17/17
Hours Tested'
Produdicn far
Oil-Bbi
Gas -MCF:
Water -Bbl:
Choke Sive.
Gas -Oil Ratio
12
Test Period y
689
2012
12
a0
2920
Flow Tubing 0
Press
Casing Press:
1151
Calculated
24 Hour Rate y
Oil -Bbl:
1378
Gas -MCF:
4024
Water -Bbl:
24
Oil Gravity- API(wm:
26.1
Form IDA07 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only
RBU'S
L tav22.2017
,11
28. CORE DATA ( Conventional Cores) Yes ❑ No 0 Sidewall Cores Yes ❑ No 21
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Permafrost - Top
Well Tested? Yes ❑ No m
Permafrost - Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
9476'
8646'
separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Ugnu
4523'
4448'
West Salk
6365'
5782'
Colville Mudstone
6917'
6268'
HRZ
8483'
7785'
Base of HRZ
8684'
7961'
Kingak
8703'
7977'
Sag River
9476'
8646'
Shublik
9507'
8672'
Sadlerochit-Zone 4
9598'
8745'
Shublik (Invert)
10781'
8758'
Sag River
10977'
8698'
Shublik (Revert)
11252'
8697'
Sag River (Invert)
11295'
8697'
Formation at total depth:
Sag River (From Base)
11295'
8697'
31. List of Attachments: LOT / FIT Summary, Summary of Daily Drilling Reports, Surveys, Cement Reports, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schemafic, directional or inclination survey, care analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Sperry, Nathan
Authorized Title: Inform % and D tC Iler Contact Email: Nathan.Sperry@bp.com
Authorized Signature: Date:., Contact Phone: 907-564-4258
INSTRUCTIONS
General: This toren is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15, The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this wait is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain),
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including. but not limited to: core analysis, paleontological report, production or well test results.
Forth 10-407 Revised 512017 Submit ORIGINAL Only
TREE = 5X7 L FMC 120
WBIFEAD=
GRAY
ACTUATOR=___
BAKER
KB. BEV =
71'
i&-&E—V-:: = ------
BF. E -EV = -------'---42.16'
86.71'
KOP=
3000'
Max Angle =
114° @ 10741'
Datum MD=
9843'
DatumND=
8800' SS
= 12.347"
Minimum ID = 3.812" @ 2024'
4-1/2" HES X NIPPLE
a-IWTOL 9306'
TBG, 12.6#, 13CR-85 VAM TOP, h 9317
oPf, D = 3.958"
7" CSG, 26#, L-80 W
.0383 bpf, D = 6.276'
.0152 bpf, D = 3.958"
14-16B FM NOTES. WELL ANGLE> 700 @ 9873'. MAX
_S: 14.1° @ 10123.'"" CHROME TBG & LNR ""
MLLOUT WINDOW (14-16B) 3208' - 3220'
GAS LFT MANDRELS
ST
MD I
PERFORATION SUP MARY
DEV
I TYPE VLV LATCH
REF LOG: MAO ON 10/19117
ORIGINAL COMPLETION
ANGLEAT TOP PERF: 87° @ 11150'
Note: Refer to Froduction DB for historical pert data
SIZE
SPF
INTERVAL
OpnfSgz
SHOT
SOZ
2-7/8"
6
11150- 11225
O
10122/17
11/02/17
2-718"
6
11530- 11550
O
10122/17
0
2-7/8"
6
11650-11765
O
1022117
KBG OMY BK -2
2-718"
6
11865 - 121 DO
O
10/22/17
25
2-7/8"
6
12200 - 12525
O
1022117
6330
2-7/8"
6
12550 - 12655
O
10/22/17
.0152 bpf, D = 3.958"
14-16B FM NOTES. WELL ANGLE> 700 @ 9873'. MAX
_S: 14.1° @ 10123.'"" CHROME TBG & LNR ""
MLLOUT WINDOW (14-16B) 3208' - 3220'
GAS LFT MANDRELS
ST
MD I
ND I
DEV
I TYPE VLV LATCH
PORTLDIATE6
ORIGINAL COMPLETION
1120/17 JNJJMD UPDATED OUB, REF, & BF IFA/
3613
3597
14
K8G BK
16
NORDIC
5
5794
5373
51
KBG SO BK
20
11/02/17
4
7020
6366
17
KBCr" DMY BK -2
0
3
7797
7134
8
KBG OMY BK -2
0
2
8412
7721
25
KBG DMY BK -2
0
1
9110
6330
30
K13G DMY BK -2
0
1 9326' 1
DATE
REW BY
COMMEIVIS
DATE I FiEV BY I COMMENTS
09102161
ORIGINAL COMPLETION
1120/17 JNJJMD UPDATED OUB, REF, & BF IFA/
05107/97
D-16
R WO
12126197
NORDIC
SIDETRACKED(14-16A)
10124117
P-272
SIDETRACI®(14-166)
11/02/17
JMD
DRLG HO CORRECTIONS
11/08/17
NS/JMD
FINALODEAPPROVAL
11/13117 BSFIJMC
GLV CJO(11/09/17)
17" X 4-1/2' HES TNT PKR. D = 3.856" 1
14-1/2- HES X NP, D=3.812"
X 5" WFD LTP & HGR
/fEBACK SLV, D = 4.300'
1/2' WLEG. D
5' X 4-1/2' XO. D = 3.910"
PRUDHOE BAY UNIT
VVELL: 14-168
PDRAT No: 217-093
API No: 50-029-20608-02
'10N R14E 1050' FTL & 1093' FIi
BP Exploration (Alaska)
Page 1 of 1
BP AMERICA
LOT / FIT Summary
Well Name: 14-16B
Surface
Leak Off
Test
Test
Test Depth
Test Depth AMW
Pressure
Pressure
EMW
Date
Type
(TMD -Ft)
(TVD -Ft) (pp)
(psi)
(BHP) (psi)
(ppg)
09/27/17
LOT
3,222.00
3,216.94 10.00
600.00
2,271.14
13.59
10/08/17
FIT
9,478.00
8,646.26 8.60
667.00
4,529.75
10.09
Page 1 of 1
08:00 - 14:00 6.00 PRE RIGID RIG P MOVE RIG MODULES FROM Pt -04
ALONG PM1 ROAD TO WEST DOCK
ROAD
14:00 - 00:00 10.00 PRE RIGID RIG N WAIT LAY MATS ON OXBOW ROAD AND
North America - ALASKA - BP
Page 1 of 53
Operation Summary Report
Common Well Name: 14-16
ACCESS TO DS 14
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date 9/24/2017 End Date
X3 -0189M -C: (7,812,778.23)
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11/1981 12:00 00AM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-168 Actual @88.71 uslt (above Mean Sea Level)
Date From - To Him
Phase Task Unit or Code NPT NPT
Description of Operations
(hr)
_ - _ Rotary t _ Depth
_
9/23/2017 06:00 - 08:00 2.00
PRE
RIGID RIG
P
GENERAL RIG DOWN
8.00
PRE
RIGID
RIG
- SKID RIG FLOOR
LAY MATS ON OXBOW ROAD AND
- LAY OVER DERRICK
-SEPERATE MODULES AND STAGE IN
ACCESS TO DS 14
PREPERATION FOR MOVE
08:00 - 14:00 6.00 PRE RIGID RIG P MOVE RIG MODULES FROM Pt -04
ALONG PM1 ROAD TO WEST DOCK
ROAD
14:00 - 00:00 10.00 PRE RIGID RIG N WAIT LAY MATS ON OXBOW ROAD AND
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths'
ACCESS TO DS 14
- RIG WAITING AT WEST DOCK STAGING
AREA WHILE RIG MATS ARE BEING
PLACED ON THE ROADS
9/24/2017 00'.00
- 08:00
8.00
PRE
RIGID
RIG
N WAIT
LAY MATS ON OXBOW ROAD AND
ACCESS TO DS 14
- RIG WAITING AT WEST DOCK STAGING
AREA WHILE RIG MATS ARE BEING
PLACED ON THE ROADS
08:00
- 14:30
6.50
PRE
RIGID
RIG
P
MOBILIZE RIG MODULES FROM WEST
DOCK ROAD STAGING AREA TO OXBOW
INTERSECTION
- EAST ON OX BOW ROAD TO OX BOW
SPINE INTERSECTION, SOUTH ON SPINE
TO DS14 ACCESS ROAD. RIG ON
_
LOCATION AT 14:30.
14:30
- 18:30
4.00
PRE
RIGU
RIG
P
SPOT DRILL MODULE OVER DS14-16B
AND MATE UP UTILITY MODULE AND
MUD MODULE
- RAISE DERRICK, SKID RIG FLOOR TO
DRILLING POSITION AND MOVE HAUNCH
INTO POSITION
- RAISE DERRICK OFF RACK WITH 525
KLBS
18:30
- 20:00
1.50
PRE
RIGID
RIG
P
RIG UP OVER I4 -16B
- PERFORM IADC DERRICK INSPECTION
- BRIDLE DOWN
-RIG UP INTER -CONNECTS BETWEEN
RIG MODULES
- CONNECT FLOW LINE
- RIG UP RIG FLOOR EQUIPMENT
- RE -INSTALL WALKWAYS ON ROOF
- CONNECT STEAM AND WATER LINES
THROUGHOUT RIG
- PREP PITS TO TAKE ON SEAWATER
- SPOT CUTTINGS TANK
- RIG UP PIPE SHED
- SPOT FLOW BACK TANK, RIG UP
HARDLINE
2000
- 2200
2.00
PRE
RIGID
RIG
P
CONTINUE WITH GENERAL RIG UP
OPERATIONS
- FINISH RIGGING UP RIG FLOOR
EQUIPMENT
- BRIDLE DOWN, INSTALL TORQUE TUBE
PIN
- INSTALL MOUSE HOLES
- RU SECONDARY KILL ON THE IA
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths'
9/25/2017 00.00 - 01:30 1.50 PRE RIGU
01.30 - 0300 1.50 PRE ROD
03:00 - 06'.30 3.50 PRE RICO
06:30 - 09:30 3.00 PRE RIGU
09'.30 - 1200'. 2.50 PRE RIGU
1200 - 1800 600 PRE RIGU
- EVACUATE RIG FOR SIMULATED H2S IN
THE CELLAR
- RIG CREW EVACUATED TO THE
PRIMARY MUSTER POINT
- PRESPUD MEETING
RIG ACCEPTED AT MIDNIGHT
RIG P RIG UP OPERATIONS
- TAKE ON 8.5 PPG FRESH WATER TO
CALIBRATE PVT SYSTEM
North America - ALASKA - BP
Page 2 of 53
PRESSURE TEST BPV FROM BELOW TO
Operation Summary Report
3500 PSI HIGH FOR 5 CHARTED MIN
Common Well Name: 14-16
- 8 BBL TO PRESSURE UP, 8 BBL BLED
APE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 912 412 01 7 End Date:
X3 -0189M -C: (7,812,778,23)
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud DateTme: 6/11/1981 12:00:OOAM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
FLANGE
BPUOI: USA00000813
Active datum: 14-16B Actual @88.71 uss (above Mean Sea Level)
Date From - To Him
Phase Task Unit or Code NPT NPT
Description of Operations
. _ (hr) _
-_. Rotary Depth
22:00 - 00:00 2.00
PRE RIGD RIG P
RIG EVACUATION:
9/25/2017 00.00 - 01:30 1.50 PRE RIGU
01.30 - 0300 1.50 PRE ROD
03:00 - 06'.30 3.50 PRE RICO
06:30 - 09:30 3.00 PRE RIGU
09'.30 - 1200'. 2.50 PRE RIGU
1200 - 1800 600 PRE RIGU
- EVACUATE RIG FOR SIMULATED H2S IN
THE CELLAR
- RIG CREW EVACUATED TO THE
PRIMARY MUSTER POINT
- PRESPUD MEETING
RIG ACCEPTED AT MIDNIGHT
RIG P RIG UP OPERATIONS
- TAKE ON 8.5 PPG FRESH WATER TO
CALIBRATE PVT SYSTEM
Printed 11/612017 1:32:27PM *All depths reported in Drillers Depths'
RIG ACCEPTEDAT 00:01 ON 09/26/17
RIG P
PRESSURE TEST BPV FROM BELOW TO
3500 PSI HIGH FOR 5 CHARTED MIN
- 8 BBL TO PRESSURE UP, 8 BBL BLED
BACK
- PASSING TEST
-USE PRESSURE CROSSCHECK
CHECKLIST PRIOR TO TEST
RIG P
NIPPLE DOWN TREE AND ADAPTER
FLANGE
- FUNCTION AND INSPECT ALL LOCK
DOWN SCREWS AND GLAND NUTS PER
CAMERON REP
- CLEAN AND INSPECT HANGER
THREADS.
- MAKE UP BLANKING PLUG
- INSTALL TEST DART IN K -PLUG. MAKE
UP4-1/21FX 5-1/2"MCA CROSSOVER
WITH BLANKING PLUG ON TOP (18
TURNS) TO MAKE UP
- STICK UP 40" ABOVE LOWER LOCK
DOWNSCREWS
SIMOPS:
- CONTINUE CALIBRATING PIT SENSORS
- GENERAL HOUSEKEEPING
THROUGHOUT RIG.
RIG P
NIPPLE UP ROPE AND HIGH PRESSURE
RISER
- REMOVE 18" RISER AND INSTALL 24"
RISER SECTION
- TORQUE ALL BOLTS TO SPEC
- OBTAIN RKB MEASUREMENTS
- UPPERAND LOWER RAMS DRESSED
WITH 2-7/&'X 5" VBR'S
RIG P
RIG UP TO TEST BOPE
- MAKE UP AND SPACE OUT TEST
JOINTS
-FILLALLSURFACE LINESAND
EQUIPMENT WITH FRESHWATER
RIG P
TEST ROPE TO 250 PSI LOCK, 3500 PSI
HIGH FOR 5 MINUTES EACH PER BPAND
AOGCC REQUIREMENTS
- ALL TESTS PASS, SEE ATTACHED TEST
CHARTS
- TEST WITH 4" AND 5" TEST JOINTS
- TESTALARMS, PVTAND FLOW SHOW
- TEST WITNESS WAIVED BY AOGCC
REP BRIAN BIXBY
Printed 11/612017 1:32:27PM *All depths reported in Drillers Depths'
Printed 1116/2017 1:3227PM *AI depths reported in Drillers Depths'
North America - ALASKA - BP
Page 3 of 53
Operation Summary Report
Common Well Name: 14-16
AFE No
Event Type: RE-ENTER- ONSHORE
(RON)
Start Date: 9/2 412 01 7
End Date.
X3 -0189M -C: (7,812,778 23 )
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Date/time: 8/11/1981 120000AM
Rig Release. 10/24/2017
Rig Contractor: PARKER DRILLING
CO.
BPUOI: USA00000813
Active datum: 14-16B Actual @88.7lusft (above Mean Sea Level)
Date From -To
His
Phase Task
Unit or
Code NPT NPT
Description of Operations
_
1
(hr)
Rotary
Depth
_
18:00 - 19:00
1.00
PRE RIGU
RIG
P
RIG DOWN BOPE TEST EQUIPMENTAND
MAKE UP 4" LANDING JOINT TO PULL
BLANKING PLUG THROUGH DUTCH
RISER.
19:00 - 21:00
2.00
PRE RIGU
RIG
P
RIG UP DUTCH RISER AND LUBRICATOR.
PULL BLANKING PLUG AND BPV.
- INSTALL DUTCH RISER AND FILL WITH
FRESH WATER
- MAKE UP LUBRICATOR AND PRESSURE
TEST TO 250 PSI LOW, 3500 PSI HIGH
FOR 5 MINUTES EACH
- REMOVE LUBRICATOR AND RIH WITH
BLANKING PLUG ASSEMBLY. REMOVE
BLANKING PLUG AND HANGER CROSS
OVER.
- RIH WITH T -BAR AND REMOVE K -PLUG
- MAKE UP LUBRICATORAND TEST
BREAK WITH QUICK TEST SUB
-PULL BPV
- RIG DOWN LUBRICATOR AND DUTCH
RISER
21:00 - 22:00
1.00
PRE RIGU
RIG
P
CIRCULATE OUT DIESEL WITH 300 BBLS
OF SEAWATER DOWN THE TUBING.
TAKING RETURNS THROUGH THE IA TO
THE TIGER TANK
- 8 BPM, 1050 PSI
1
- 190 BBLS OF DIESELSENT TO GC2 FOR
_
HYDROCARBON RECYCLE
22:00 - 22:30
0.50
PRE RIGU
RIG
P
SERVICE RIG FLOOR PIPE HANDLING
_
EQUIPMENT
22'.30 - 00:00
1.50
PRE RIGU
RIG
P
MAKE UPAND RUN IN HOLE WITH 4-1/2"
SCHLUMBERGER SPEAR AND PACKOFF
PER SLB REPRESENTATIVE. SPEAR AND
ENGAGE GRAPPLE 4' BELOW HANGER.
- BHA LENGTH = 12.37'
- BLEED OFF CONTROL LINE VOID AND
CAP
- BACKOUT LOCK DOWN SCREWS
- RIG UP DOYON CASING TONGS AND
SCHLUMBERGER CONTROL LINE
SPOOLER
9/26/2017 00.00 - 01:30
1.50
PRE RIGU
RIG
P
TERMINATE CONTROL LINES. BACK OUT
LOCK OWN SCREWS AND TORQUE
GLAND NUTS.
SIMOPS: BEGIN BUILDING STANDS OF 4"
DP OFFLINE _
01:30 - 02:00
0.50
PRE RIGU
RIG
P
PULL TUBING HANGER TO THE FLOOR
- INITIAL PICKUP WEIGHT = 82 KLBS (12
KLBS OVER CALCULATED STRING
WEIGHT)
- STRING WEIGHT = 70 KLBS
- MONITOR WELL FOR 10 MINUTES:
_ _�_
STATIC
02:00 - 03:00
1.00
PRE RIGU
RIG
P
CIRCULATE SOAP PILL SURFACE TO
SURFACE THROUGH TUBING CUT AT
3200' MD
- 350 GPM, 1000 PSI
- PERFORM 10 MINUTE FLOW CHECK
STATIC
Printed 1116/2017 1:3227PM *AI depths reported in Drillers Depths'
North America -ALASKA - BP
Operation Summary Report
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 9/242017 End Date.
Proiect: Prudhoe bay Site: PB DS 14
AFE No
K3-0189M-Ct(7, 812,778.23)
Page 4 of 53
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum. 14-16B Actual @88.7lusft (above Mean Sea Level)
Date From - To
Hire
Phase
Task
Unit or Code NPT
NPT Description of Operations
(hr)
Rotary
Depth _
-
03:06__ -MO
0.50
PRE
RIGU
RIG P
DISENGAGE 4-12" SPEAR PER
SCHLUMBERGER FISHING REPAND LAY
--_-_DOWN
03:30 - 04:00
0.50
PRE
RIGU
RIG P
LAY DOWN TUBING HANGER
04:00 - 08:30
4.50
PRE
RIGU
RIG P
PULL 4-1/2" NSTC, 12.6#, 13CR-80 TUBING
WITH 2 CONTROL LINES FROM TUBING
CUT AT -3238' MD.
- MONITOR WELL FOR 10 MINUTES:
STATIC
- PU = 70 KLBS, SO = 70 KLBS 3238' MD
- LAY DOWN 74 JOINTS OF 4-1/2"
TUBING, 1 GAS LIFT MANDREL WITH
HANDLING PUPS, 1 SSSV WITH
HANDLING PUPS
- RECOVER 1 CUT JOINT WITH LENGTH
39.62 IN, WITH A CUT FLARE OF 4-7/8"
- RECOVER 47/58 STAINLESS STEEL
BANDS
- MUD WEIGHT IN/OUT =8.5 PPG
- MONITOR HOLE FILL VIA TRIP TANK
GOOD HOLE FILL
08:30 - 10'.30
2.00
PRE
RIGU
RIG P
RIG DOWN DOYON CASING
- CLEAN AND CLEAR RIG FLOOR
- MAKE UP HANDLING JOINTAND SET
8-3/4" WEAR RING
- MAKE UP SHEAR JOINT
- BLOW DOWN SURFACE LINES AND
EQUIPMENT
10:30 - 1500
4.50
WEXIT
WHIP
RIG P
MAKE UP 9-5/8"TRACKMASTER
WHIPSTOCKAND MILLING ASSEMBLY
PER SCHLUMBERGER REPRESENTATIVE
- PICK UP WHIPSTOCKAND MAKE UP TO
TRI-MILLASSEMBLY
- PICK UP (9) JOINTS DRILL COLLARS
- PICK UP (29) JOINTS HEAVY WEIGHT
DP
- PLUG IN AND UPLOAD MWD
- SHEAR PINS SETAT 30 KLBS FOR
SHALLOW SET DEPTH _
15:00 - 17'.00
2.00
WEXIT
WHIP
RIG P
RUN IN HOLE WITH WHIPSTOCKAND
MILLING BHA FROM 1295' MD TO 3200'
MD ON ELEVATORS
- RUN IN HOLE ON 4" DRILLPIPE
- FILL PIPE EVERY 2000' MD
- SHALLOW HOLE TEST TOOLS AT 1391'
MD
- RIH AT 40 FT/MIN PER SCHLUMBERGER
REPRESENTATIVE
- PU = 130 KLBS, SO = 132 KLBS AT 3200'
MD
- MONITOR DISPLACEMENT WITH TRIP
TANK: GOOD DISPLACEMENT
Printed 11/6/2017
1:32:27PM *All depths reported in Drillers Depths'
Common Well Name. 14-16
Event Type: RE-ENTER- ONSHORE (RON)
North America - ALASKA - BP Page 5 of 53
Operation Summary Report
AFE No
Start Date: 9/24/2017 Eno Date: X3 -0189M -C: (7,812,778.23 )
Site: PB DS 14
Rig Name/No.: PARKER 272 Spud DateRime: 8/11/1981 12:OO:OOAM Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO. BPUOI: USAOOOOOB13
Active datum: 14-168 Actual @88.71 usR (above Mean Sea Level)
Date From- To Him Phase Task Unit or Code NET NPT Descnp8on of Operations
(hr) Rotary Depth
17:00 - 18:00 1.00 WEXIT WHIP RIG P ORIENT AND SET WHIPSTOCK AT 3235'
MD
-ORIENT WHIPSTOCK TO 274 DEG HIGH
SIDE WITH MWD
- TAG TOP OF STUMP AT 3236' MD
- PICK UP 5'AND SET WHIPSTOCK
- SHEAR OFF WITH 35 KLBS DOWN
- PU =128 KLBS, SO = 130 KLBS AFTER
SHEAR
TOP OF SLIDE = 3208' MD
18:00
- 1830
0.50
WEXIT
WHIP
RIG
P
DISPLACE 8.5 PPG SEAWATER WITH 10
PPG LSND MILLING FLUID
- 550 GPM, 1530 PSI
- PUMP 40 BBL ELVIS SPACER SWEEP
18:30
- 19:00
0.50
WEXIT
WHIP
RIG
P
SERVICE TOP DRIVE
19:00
- 00:00
5.00
WEXIT
WHIP
RIG
P
MILL WINDOW FROM 3206' TO 3220' MD
- 450 GPM, 1010 PSI ON BOTTOM, 1000
PSI OFF BOTTOM, 60-90 RPM, TORQUE _
4-9 KFT-LBS ON, 2 KFT-LBS OFF, 2-10
KLBS WOB
- PU = 127 KLBS, SO = 127 KLBS, ROT =
127 KLBS
- MUD WEIGHT IN/OUT = 10 PPG
9/27/2017 00:00 - 03:00 300 WEXIT WHIP RIG P CONTINUE TO MILLWINDOWAND 20'OF
NEW FORMATION FROM 3220' TO 3242'
MD
-450 GPM, 1010 PSI ON BOTTOM, 1000
PSI OFF BOTTOM, 60-90 RPM, TORQUE _
4-9 KFT-LBS ON, 2 KFT-LBS OFF, 2-10
KLBS WOB
- PU = 127 KLBS, SO = 127 KLBS, ROT =
127 KLBS
- MUD WEIGHT IN/OUT= 10 PPG
- DRIFT WINDOW WITH AND WITHOUT
PUMPS, NO NOTABLE DRAG ACROSS
WINDOW
- PULLBACK INSIDE WINDOW AND
PERFORM 10 MINUTE FLOW CHECK:
STATIC
103:00 - 04:00 1.00 WEXIT WHIP RIG P CIRCULATE HI VIS SWEEP
- 420 GPM, 1040 PSI
_ - 90 RPM, 1600 KFT-LBS TORQUE _ _
04:00 - 05:00 1.00 WEXIT WHIP RIG P PERFORM LEAK OFF TEST TO 13.5 PPG
EM W
-ENSURE MW IN = MW OUT AT 10 PPG
- 3.0 BBLS PUMPED, 1.1 BBLS BLED
BACK
TEST DEPTH TVD = 3212' MD
PRESSURE UP TO 600 PSI AND
OBSERVE PRESSURE TREND BREAK
OVER
- PROVIDE ODE WITH TEST
DOCUMENTATION AND RECIEVE
APPROVAL TO PROCEED
Printed 11/6/2017
1:32:27PM *All depths reported in Drillers Depths*
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE(RON)
Project Prudhoe Bay
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLING CO.
Active datum: 14-16B Actual @88.71 usft (at
Date From - To Ars
(hr)
05:00 - 05:30 0.50
North America - ALASKA - BP Page 6 of 53
Operation Summary Report
Start Date', 9/24/2017 End Dale:
Site: PB DS 14
Spud Date/rime: 8/11/1981 120000AM
Mean Sea Level)
Phase Task
WEXIT WHIP
05.30
- 0730
2.00
WEXIT
WHIP
0730
- 0830
1.00
WEXIT
WHIP
08:30
- 10:30
2.00
INTI
DRILL
1030
- 1200
1.50
INTI
DRILL
1200.
- 1830
6.50
INTI
DRILL
18:30 - 19:00 0.50 INTI DRILL
19:00 - 21:00 2.00 INTI DRILL
AFE No
K3 -0189M -C: (7,812,77813)
Rig Release: 10/24/2017
Unit or Code NPT NPT Description of Operations
Rotary Depth
RIG P PULLOUTOF THE HOLE WITH MILLING
ASSEMBLY FROM 3235' MD - 1295' MD
- MONITOR HOLE FILL WITH TRIPTANK:
GOOD HOLE FILL
- MONITOR WELL FOR 10 MINUTES:
STATIC
- PU = 126 KLBS, SO = 127 KLBS AT 3241'
MD
- MW IN/OUT = 10 PPG
RIG P LAY DOWN MILLING BHA FROM 1295' MD
PER SCHLUMBERGER REP
- MONITOR WELL FOR 10 MINUTES
BEFORE PULLING NON SHEARABLES
THROUGH THE STACK: STATIC
- PU = 72 KLBS, SO = 72 KLBS AT 1295'
MD
- MW IN/OUT = 10 PPG
RIG P CLEAN AND CLEAR RIG FLOOR AND
FLUSH STACK
RIG P MAKE UP AND RUN IN HOLE WITH 8-1/2"
DRILLING BHA FROM SURFACE TO 821'
MD ON ELEVATORS
- MW IN/OUT = 10 PPG
- CALIBRATE BLOCKS WITH BAKER
RIG P RUN IN HOLE WITH 8-1/2" DRILLING BHA
FROM 821' MD TO 3242' MD
- RUN IN HOLE ON ELEVATORS
-
MW IN/OUT = 10 PPG
- MONITOR DISPLACEMENT WITH TRIP
_ TANK: GOOD DISPLACEMENT_
RIG P DIRECTIONAL DRILL 8-1/2"
INTERMEDIATE HOLE FROM 3242' MD TO
3559' MD / 3545' TVD IN THE SV4 AND
SV3 FORMATIONS (317' IN 6.5 HRS =49
FT/HR)
- 550 GPM, 1790 PSI ON BOTTOM, 1730
PSI OFF BOTTOM
-60 RPM, 3 KFT-LBS TORQUE ON
BOTTOM, 1 KFT-LBS TORQUE OFF
BOTTOM, 16 KLBS WOB
- PU = 110 KLBS, SO = 108 KLBS, ROT =
107 KLBS
-SURVEY EVERY -90 FT
- FIRST CLEAN SURVEY OBSERVED AT
3404' MD
- BACKREAM 30 FTAT CONNECTIONS
- NO LOSSES WHILE DRILLING AHEAD
- MW IN/OUT =10 PPG
SIMOPS: BUILD STANDS OF 4" DP
OFFLINE
RIG P CIRCULATE 2X BU AT 550 GPM
- 550 GPM, 1785 PSI
- MONITOR WELL FOR 10 MINUTES FOR
PULLING OFF BOTTOM: STATIC
RIG P PULLOUT OF HOLE ON ELEVATORS
FROM 3559' MD TO 840' MD
i - MONITOR WELL FOR 10 MINUTES
BEFORE PULLING NON-SHEARABLES
THROUGH THE STACK: STATIC
- PU = 71 KLBS, SO = 69 KLBS AT 840' MD
Printed 11/6/2017 1:32:27PM •AII depths reported in Drillers Depths'
i
NorthAmerica- ALASKA - BP
Operation Summary Report
Page 7 of 53
Common Well Name. 14-16
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date9/24/2017
End Date.
X3 -0189M -C: (7,812,77823)
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud DateTme: 8/11/1981 12,00
OOAM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOL USA00000S13
Active datum: 14-16BActual @88.71usft (above Mean Sea Level)
Date From - To Hrs
Phase Task Unit or
Code NPT
NPT Description of Operators
(hr)
-21:00
Rotary
_
Depth
- 23:30 2.50
INTI DRILL RIG
P
PULL OUT OF HOLE FROM 840 TO
SURFACE RACK BACK AND LAY DOWN
BHA
- RACK BACK HWDP AND DC
BIG GRADE 1-1 WT -A -E -I -NO -BHA _
23:30 - 0000 0.50
INTI DRILL RIG
P
SERVICE ST -80 AND TOP DRIVE
9/28/2017 00:00 - 04:00 4.00
INTI DRILL RIG
P
MU 8-1/2" RSS DRILLING BHA WITH
FROM SURFACE TO 567' MD
- HYCALOG 616-Jl D PDC BIT WITH
GR@BIT/GR/RES/DIR/P WDIVSS/CO-PILO
T/ANDERREAMER
- RIH ON ELEVATORS, PICKING UP
TOOLS FROM PIPE SHED
- PLUG IN AND UPLOAD TOOL
- SHALLOW HOLE TEST TOOLS AT 567'
MD
- MW IN/OUT = 10 PPG
- MONITOR DISPLACEMENT WITH TRIP
TANK: GOOD DISPLACEMENT
04:00 - 07:00 3,00
INTI DRILL RIG
P
RUN IN HOLE WITH 8-1/2" RSS DRILLING
BHA FROM 567' MD TO 3559' MD ON
ELEVATORS
-MONITOR DISPLACEMENT WITH TRIP
TANK: GOOD DISPLACEMENT
- WASH DOWN AND OBTAIN LOGS FROM
3425' TO 3559' MD
- DROP BALLAND OPEN UNDERREAMER
PER NOV REPRESENTATIVE
- OBTAIN BASELINE ECD READINGS
- RIH AT 200 FT/MIN PER GUIDELINES
FROM WELL PROGRAM _
07:00 - 12:00 5.00
INT1 DRILL RIG
P
DRILLAHEAD IN B-1/2" X 9-7/8"
INTERMEDIATE HOLE WITH RSS AND
ANDERREAMER DRILLING ASSEMBLY
FROM 3559' MD TO 4013' MD / 3977' MD IN
THE SV FORMATION (454' IN 5 HOURS =
91FT/HR)
- 750 GPM, 3000 PSI ON BOTTOM, 3000
PSI OFF BOTTOM
-150 RPM, 3 KFT-LBS TORQUE ON
BOTTOM, 2 KFT-LBS TORQUE OFF
BOTTOM, 20 KLBS WOB
- INSTANTANEOUS ROP = 250 FT/HR
- PU = 111 KLBS, SO =107 KLBS, ROT =
102 KLBS
- MUD WEIGHT IN/OUT = 10 PPG
- SURVEY EVERY STAND
- ECD ACTUAL= 10.75 PPG EMW
- NO BACKREAMING AT CONNECTIONS
- NO LOSSES TO THE FORMATION WHILE
DRILLING AHEAD
Printed 11/6/2017 1:32:27PM •AAI depths reported in Drillers Depths'
North Arnenra -ALASKA - BP
Operation Summary Report
Common Well Name: 14-16
Event Type. RE-ENTER- ONSHORE (RON)
Start Date. 9/24/2017
Project: Prudhoe Bay
Site. PB DS 14
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11
Rig Contractor: PARKER DRILLING CO.
Active datum: 14-168 Actual @88.71 usfi (above Mean Sea Levet)
Date From - To Hrs
Phase Task
(hr)
12:00 - 00:00 1200.
INTI DRILL
End Date
Unit or Code NPT
Rotary _
RIG P
Printed 11162017 1:32:27PM *All depths reported in Drillers Depths'
Page 8 of 53
AFE No
X3 -0189M -C:(7,812,778.23)
BPUOI: USA00000813
NPT Description of Operations
Depth
DRILLAHEAD IN 8-1/2" X 9-7/8"
INTERMEDIATE HOLE WITH RSSAND
UNDERREAMER DRILLING ASSEMBLY
FROM 4013' MD TO 5102' MD / 4924' TVD
IN THE SVAND UG4/3 FORMATIONS
(1089' IN 12 HOURS = 91 FT/HR)
- 715 GPM, 3580 PSI ON BOTTOM, 3550
PSI OFF BOTTOM
- 150 RPM, 5 KFT-LBS TORQUE ON
BOTTOM, 3 KFT-LBS OFF BOTTOM, 14-20
KLSS WOB
- INSTANTANEOUS ROP = 250 FT/HR
- SURVEY EVERY STAND
-ECD ACTUAL =10.9 PPG
- LOSSES WHILE DRILLING: 20 BBLS
- MUD WEIGHT IN/OUT = 10 PPG
PUMP 40 BBL HI VIS SWEEPS:
@ 4500' MD: 50% INCREASE IN
CUTTINGS
@ 5000' MD: 75% INCREASE IN
CUTTINGS
SIMOPS: BUILD STANDS OF 4" DP
OFFLINE
North America -ALASKA - BP
Operation Summary Report
Page 9 of 53
Common Well Name: 14-16
APE No
Event Type'. RE-ENTER- ONSHORE (RON) Start Date: 9/24/2017 End Dale'.
X3 -0189M -C: (7,812,778.23 )
Project: Prudhoe Bay Site: PB DS 14
Rig Name/No.: PARKER 272 Spud Date/time: 8/11/1981 12:00:OOAM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-16B Actual (0388.71 usfl (above Mean Sea Level)
Date From - To Him Phase Task Unit or Code NPT
NPT Description of Operations
(hr) Rotary
Depth_
9/29/2017 00:00 - 12:00 12.00 INTI DRILL RIG P
DRILLAHEAD IN B -1/2"X9-7/8"
INTERMEDIATE HOLE WITH RSS AND
ANDERREAMER DRILLING ASSEMBLY
FROM 5102' MD TO 5700' MD / 5314' TVD
IN THE UG4/3 FORMATIONS (598 FT IN 12
HOURS = 50 FT/HR)
' - 715 GPM, 3744 PSI ON BOTTOM, 3650
PSI OFF BOTTOM AT 5102' MD
- 150 RPM, 5 KFT-LBS TORQUE ON
BOTTOM, 3 KFT-LBS OFF BOTTOM, 12-25
KLBS WOB
- INSTANTANEOUS ROP =100-200 FT/HR
- SURVEY EVERY STAND
' - BUILD INCLINATION FROM 41 DEG TO 51
DEG DEG AT 5700' MD
i - ECDACTUAL= 10.5 - 10.8 PPG EMW
- MUD WEIGHT IN/OUT = 10 PPG
- NO BACKREAMING AT CONNECTIONS
- OBSERVE OCCASIONAL SPIKES IN GAS
WATCH VALUES TO -1000 UNITS,
CORRESPONDING TO COAL SEAMS IN
THE UGNU FORMATIONS
OBSERVE INCREASING PUMP
PRESSURE WHILE DRILLING AHEAD:
@ 3920' MD: 745 GPM, 3000 PSI
@ 4500' MD: 735 GPM, 3300 PSI
@ 5000' MD: 715 GPM, 3500 PSI
@ 5400' MD: 715 GPM, 3750 PSI
@ 5500' MD: 705 GPM, 3800 PSI
@ 5600' MD: 705 GPM, 3900 PSI (BEGIN
OBSERVING FLUCTUATING PRESSURE
WITH INCREASED WOB)
@ 5500' MD: 705 GPM, 4100 PSI
OBSERVE PRESSURE SPIKES
CORRESPONDING WITH APPLIED WOB
AT ^5600' MD IN THE UG4A/UG3
- COPILOT READINGS INDICATE THAT
APPLIED WOB IS NOT BEING
TRANSFERRED DOWN TO THE
BIT/COPILOT ASSEMBLY
- OBSERVE PRESSURE SPIKING FROM
3800 PSI TO 4400 PSI
PULL 3 STANDS TO ATTEMPT TO
ALLEVIATE HIGH PUMP PRESSURE
FROM 5670' MD TO 5385' MD
- PUMP OUT OF THE HOLE 3 STANDS
WITH NO SIGNS OF OVERPULL
- 715 GPM, 3900 PSI AT TOP OF SHORT
TRIP
WASH BACK DOWN TO BOTTOM AT FULL
RATE FROM 5385' MD TO 5670' MD
- OBSERVE SLIGHT DRAG -5-10 KLBS
- 715 GPM, 4200 PSI ON BOTTOM
- OVERALL NO PRESSURE RELIEF FROM
PULLING 3 STANDS
PUMPED 35 BBL HI VIS SWEEP:
@ 5735' MD: 35 BBL HI VIS SWEEP WITH
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths`
North America - ALASKA - BP Page 10 of 53
Operation Summary Report
Common Well Name: 14-16
DRILL
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Stan Date: 9/2412017 End Date
X3 -0189M -C: (7,812,778.23)
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11/1981 12:00:00AM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-16B Actual @88.71usft (above Mean Sea Level)
Date From - To His
Phase Task Unitor Code NPT
NPT Descnption of Operations
(hr)
Rotary
Depth
12:00 - 21:00 9.00 INT1 DRILL RIG P
21:00 - 22:30 150 INTI DRILL RIG P
2230 - 0000 1.50
9/30/2017 00:00 - 01:30 1.50
INT1
DRILL
RIG N
INTI
DRILL
RIG N
NUT PLUG WHEN BACK ON BOTTOM
WHILE DRILLING AHEAD, OBSERVE 200%
INCREASE IN CUTTINGS WITH COAL,
CLAYAND SAND
SIMOPS: BUILD STANDS OF 4" DP
_
'OFFLINE
DRILL AHEAD IN 8-1/2" X 9-7/8"
INTERMEDIATE HOLE WITH RSS AND
UNDERREAMER DRILLING ASSEMBLY
FROM 5700' MD TO 6330' MD / 5752' TVD
IN THE UG3/WS2 FORMATION (630 FT IN
9 HOURS = 70 FT/HR)
- 700 GPM, 4175 PSI ON BOTTOM, 4100
PSI OFF BOTTOM
- 150 RPM, 8 KFT-LBS TORQUE ON
BOTTOM, 4 KFT-LBS TORQUE OFF
BOTTOM, 14 KLBS WOB
- PU = 144 KLBS, SO = 118 KLBS, ROT =
120 KLBS
- SURVEY EVERY STAND
- DROP INCLINATION ANGLE FROM 51
DEG TO 36 DEG AT 6330' MD
- ECD ACTUAL = 10.62 PPG EMW
- BEGIN TO OBSERVE WELL TAKING
FLUID AT -5950' MD
- MUD LOSSES = 20 BBLS/HR
- MUD WEIGHT I WOUT = 10 PPG
PUMPED 35 BBL HI VIS SWEEPS:
@ 5750' MD: 35 BBL HI VIS SWEEP WITH
NUT PLUG, 0% INCREASE IN CUTTINGS
@ 6150' MD: 35 BBL HI VIS SWEEP, 75%
INCREASE IN CUTTINGS
PERFORM 5 STAND WIPER TRIP FROM
6330' MD TO 5760' MD ON ELEVATORS
TO ASSESS HOLE CONDITIONS AND
ATTEMPT TO ALLEVIATE HIGH PUMP
PRESSURES
- NO SIGNS OF OVERPULL OR DRAG
- CBU AFTER WIPER TRIP AND OBSERVE
GAS WATCH SPIKE TO -350 UNITS AT
BOTTOMS UP
- FLOW CHECK FOR 10 MINUTES AT TOP
OF WIPER TRIP BEFORE RUNNING BACK
IN THE HOLE: STATIC
RREP 6,330.00 TROUBLESHOOT AND REPLACE
CRACKED SUCTION POD ON MUD PUMP
#2
- PERFORM INSPECTION OF PUMP #2
AND OBSERVE CRACKED SUCTION POD
#3
- REPLACE SUCTION POD #3
RREP 6,330.00 CONTINUE TO REPAIR MUD PUMP#2
SUCTION POD #3
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths`
North America - ALASKA - BP
Operation Summary Report
Common Well Name'. 14-16
Event Type: RE -ENTER -ONSHORE (RON)
Project: Prudhoe Bay
Start Date. 9/24/2017 End Date.
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11/1981 12:00:00AM
Active datum: 14-16B Actual @88.71 usft (above Mean Sea Level)
Date From - To Him Phase Task Unit or Code
(hr) Rotary_ _
01:30 - 1200 10.50 INT1 DRILL RIG P
Page 11 of 53
AFE No
K3 -0189M -C'.(7,812,778. 23
BPUOI. USA00000813
NPT NPT Description of Operations
Depth__. _
DRILLAHEAD IN 8 -117 -X9 -7/B"
9-7/B"
INTERMEDIATE HOLE WITH RSSAND
UNDERREAMER DRILLING ASSEMBLY
FROM 6300' MD TO 7000' MD / 6347' TVD
IN THE WS21 WS1/CM3 FORMATIONS
- 700 GPM, 4250 PSI ON BOTTOM, 4220
PSI OFF BOTTOM
- 150 RPM, 7 KFT-LBS TORQUE ON
BOTTOM, 5 KFT-LBS TORQUE OFF
BOTTOM, 10-14 KLBS WOB
- PU = 160 KLBS, SO = 127 KLBS, ROT =
133 KLBS
- NOVOS AND SOFTSPEED ENABLED
- SURVEY EVERY STAND
- ECD ACTUAL= 10.7 PPG EMW
- MUD WEIGHT IN/OUT = 10 PPG/10.1
PPG
- 10-15 BPH DYNAMIC LOSS RATE
- WS1 AT 6762' MD (6124' TVD)
- CM3 AT 6923' MD (6274' TVD)
12:00 - 20:00 8.00 INTI DRILL RIG P DRILLAHEAD IN 8-1/2"X9-7/8"
INTERMEDIATE HOLE WITH RES AND
UNDERREAMER DRILLING ASSEMBLY
FROM 7000' MD TO 7380' MD / 6718' TVD
IN THE CM3 FORMATION
- 700 GPM, 4220 PSI ON BOTTOM, 4160
PSI OFF BOTTOM
- 150 RPM, 8 KFT-LBS TORQUE ON
BOTTOM, 7 KFT-LBS TORQUE OFF
BOTTOM, 10 KLBS WOB
- PU = 170 KLBS, SO = 133 KLBS, ROT =
138 KLBS
- NOVOS AND SOFTSPEED ENABLED
- SURVEY EVERY STAND
- ECD ACTUAL= 10.73 PPG EM W
- MUD WEIGHT IN/OUT = 10 PPG
REVERSE DRILLING BREAKAT 7380' MD
(NEAR TCM2), DISABLE NOVOS SYSTEM
TO MANAGE WOB, ROPAND PUMP
PRESSURES. PICKED UP OFF BOTTOM
TO RESEAT BIT AND 3% LEL ALARM
WENT OFF. SPACED OUT DRILL STRING
16' OFF BOTTOM (7365' MD) AND FLOW
CHECKED WELL. OBSERVED GAS
BREAKING OUT IN BELL NIPPLE AND
FLOW FROM WELL. GAS WATCH
READINGS IN POSSUM BELLY
INCREASED TO 547 UNITS.
SHUT-IN WELL PER STANDING ORDERS
AND MADE TIER 3 NOTIFICATIONS.
INITIAL SHUT-IN CASING PRESSURE = 0
PSI. INCREASED TO 10 PSI AFTER 10
MIN,
Printed 11/6/2017 1:32:27PM *Ali depths reported in Drillers Depths*
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE (RON)
Project: Prudhoe Bay
Rig Name/No.: PARKER 272
Active datum: 14-168 Actual @8
Date From - To
20:00 _-23 -00
North America - ALASKA - BP
Operation Summary Report
Start Dale. 9/24/2017 End Date:
Site: PB DS 14
71 usft (above Mean Sea Level)
Him Phase Task
(hr)
3.00 INTI DRILL
Unit or Code
Rotary
RIG N
2300 - 00:00 1.00 INTI DRILL RIG N
Page 12 of 53
AFE No
K3 -0189M -C'.(7,812,778.231
BPUOI: USA00000813
NPT NPT
Description of Operations
Depth
DPRB 7,381.00
DISCUSS WELL CONDITIONS PRIOR TO
SHUT-IN WITH LOSSES AT 0-10 BPH
DYNAMIC, 0 BPH STATIC AND LOW
CASING PRESSURE WITH ACTING WSUP
AND ACTING WOM. DECISION MADE TO
PERFORM EXHALE TEST WITH 2 BBL
BLEEDS THROUGH MUD GAS
SEPARATOR PER WELLBORE
BREATHING RP TO DETERMINE IF FLOW
WAS A RESULT OF INDUCED
BREATHING.
-SHUT-IN CASING PRESSURE 10 PSI
-SHUT-IN DRILL PIPE PRESSURE 40-50
PSI (HYDROSTATIC PRESSURE FROM
KELLY HOSE -95' ABOVE TO RIG FLOOR
WITH 10 PPG MUD = 49 PSI)
- LINED UP THROUGH THE MUD GAS
SEPARATOR TO A TRIP TANK AND FLUID
PACKED ALL LINES.
OPENED CHOKE AND BLED OFF 2 BBLS
OVER 30 MIN. CLOSED CHOKE.
- SHUT-IN CASING PRESSURE
STABILIZED AT 10 PSI AFTER 20 MIN.
OPENED CHOKE AND BLED OFF
SECOND 2 BBL INCREMENT OVER 23
MIN. CLOSED CHOKE.
- SHUT-IN CASING PRESSURE
STABILIZED AT 20 PSI AFTER 30 MIN.
UNABLE TO VALIDATE WELLBORE
BREATHING DUE TO INCREASE IN
SHUT-IN PRESSURES AND INCREASE IN
FLOW BACK RATES DURING BLEED
OFFS. DISCUSSED RESULTS WITH
ACTING WSUPAND ACTING WOM.
APPROVED TO PERFORM FIRST
CIRCULATION OF THE DRILLER'S
METHOD AND CIRCULATE A SURFACE TO
SURFACE VOLUME WITH THE ORIGINAL
10 PPG MUD.
DPRB 7,381.00
HELD PRE -JOB MEETING WITH RIG
CREW. VERIFIED MUD GAS SEPERATOR
VENT LINE CLEAR OF ICE WITH STEAM.
LINED UP TO CIRCULATE.
BEGIN FIRST CIRCULATION OF
DRILLER'S METHOD WITH 10.0 PPG MUD.
- 40 SPM; 400 PSI; HOLDING 50 PSI BACK
PRESSURE ON THE CHOKE.
Printed 11/6/2017 1 32:27PM `AAI depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 13 of 53
Common Well Name: 14-16
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 9/24/2017
End Date.
X3 -0189M -C: (7,812,778.23 )
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud DateRme: 8/11/1981 120000AM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum. 14-16B Actual C88.71us8 (above Mean Sea Level)
Date From - To Hrs
Phase Task
Unit or
Code NPT
NPT
Description of Operations
(hr)
Rotary
Depth
-
_
10/1/2017 00:00 - 02:00 2.00
INTI DRILL
RIG
N DPRB
7,381.00
7,381.00
CONTINUE WITH FIRST CIRCULATION OF
DRILLER'S METHOD WITH 10.0 PPG MUD.
- 40 SPM; 400 PSI; HOLDING 50 PSI BACK
PRESSURE ON THE CHOKE
- SHUT DOWN PUMPS AND CLOSE
CHOKE AT SURFACE TO SURFACE
VOLUME
- CASING PRESSURE BUILT BACK UP TO
20 PSI
LINEUP THROUGH MUD GAS
SEPARATOR TO TRIP TANK AND BLED
BACK 1.5 BBLS OVER 15 MIN. CLOSE
CHOKE.
- SHUT-IN CASING PRESSURE
STABILIZED AT 20 PSI AFTER 15 MIN.
NOTIFYACTING WOM OF PRESSURE
AFTER CIRCULATION AND BEGIN
WEIGHTING UP ACTIVE PIT TO 10.1 PPG.
02:00 - 05:30 3.50 INTI DRILL RIG N DPRB 7,381.00 WEIGHT UPACTIVE ITO 10.1 PPG AND
STAGE BARITE IN HOPPER ROOM TO
MAINTAIN 10.1 PPG THROUGH SECOND
CIRCULATION OF DRILLER'S METHOD
BEGIN SECOND CIRCULATION WITH 10.1
PPG -SND.
- 40 SPM; 400 PSI; HOLDING 50 PSI BACK
PRESSURE ON THE CHOKE
-SHUT DOWN PUMPS AND CLOSE
CHOKE AT SURFACE TO SURFACE
VOLUME WITH 10.1 PPG IN/OUT
- NO PRESSURE ON THE CASING
- OPEN CHOKEAND VERIFY NO FLOW
THROUGH THE MUD GAS SEPARATOR.
- OPEN UP THE ANNULAR AND VERIFY
WELL STATIC.
0530 - 1000 4.50 INT1 DRILL RIG N DPRB 7,381.00 TAKE SLOW PUMP RATES WITH 10.1 PPG
MUD IN/OUTAND CONTINUE DRILLING
AHEAD IN 8-1/2" X 9-7/8" INTERMEDIATE
HOLE FROM 7380' MD TO 7385' MD. GAS
WATCH READINGS SPIKED UP TO 2515
UNITS.
- PERFORM FLOW CHECK; GAS
BREAKING OUT BUT NO FLOW
CLOSE ANNULAR PREVENTER AND LINE
UP TO CIRCULATE THROUGH THE MUD
GAS SEPARATOR TO KEEP GAS OUT OF
PITS WHILE PERFORMING THE
PLANNED WEIGHT UP TO 10.3 PPG.
- 200 GPM; 540 PSI THROUGH AN OPEN
CHOKE AND THE MUD GAS SEPARATOR.
- 10.3 PPG IN/OUT, SHUT DOWN PUMPS
AND MONITOR WELL FOR 10 MIN -
STATIC.
- OPEN ANNULAR PREVENTER AND
BLOW DOWN CHOKE MANIFOLD
- TAKE SLOW PUMP RATES WITH 10.3
PPG MUD IN/OUT
Printed 111WO17 1:3227PM *All depths reported in Drillers Depths'
North America - ALASKA - BP Page 14 of 53
Operation Summary Report
Common Well Name. 14-16
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date' 9/24/2017 End Date
X3 -0189M -C: (7,812,778,23)
Project: Prudhoe Bay
Site: PB DS 14
Rig Namei PARKER 272
Spud Date/Time: 8/11/1981 12:00:00AM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-16B Actual Q88.71 usft (above Mean Sea Level)
Date From - To Hrs
Phase Task Unitor Code NPT
NPT Description of Operations
_ (hr) _
- Rotary
Depth
10:00 - 00:00 14.00
INT1 DRILL RIG P
CONTINUETO DRILLAHEAD IN 13-1/2"X
9-7/8" INTERMEDIATE HOLE FROM 7385'
MD TO 8030' MD / 7362' TVD IN THE
CM2/CMl FORMATION (645 FT IN 14
HOURS = 46 FT/HR)
- 650 GPM, 4240 PSI ON BOTTOM, 4210
PSI OFF BOTTOM
- 150 RPM, 9 KFT-LBS TORQUE ON
BOTTOM, 6 KFT-LBS TORQUE OFF
BOTTOM, 10-12 KLBS WOB
- PU = 181 KLBS, SO = 137 KLBS, ROT =
148 KLBS
- NOVOS AND SOFTSPEED ENABLED
- SURVEY EVERY STAND
- ECDACTUAL= 11.1 PPG EMW
- MUD WEIGHT IN/OUT = 10.3 PPG
PUMPED 35 BBLWEIGHTED SWEEP:
@ 7850' MD: 35 BBL 1.5PPG OVER
WEIGHTED SWEEP, 0% INCREASE IN
CUTTINGS
_
CM1 AT 8001' MD (7334' TVD)
10/2/2017 00:00 12:00 1200.
INTI DRILL RIG P
DRILLAHEAD IN 8-1/2" X 9-7/8"
INTERMEDIATE HOLE FROM 8030' MD TO
8500' MD (7799' TVD) IN THE CM1/HRZ
FORMATION (470 FT IN 12 HOURS = 39
FT/HR WITH CONNECTIONS)
- 620 GPM, 4290 PSI ON BOTTOM, 4290
PSI OFF BOTTOM
- 180 RPM, 9 KFT-LBS TORQUE ON
BOTTOM, 7.5 KFT-LBS TORQUE OFF
BOTTOM, 12-15 KLBS WOB
- PU = 205 KLBS, SO = 140 KLBS, ROT =
151 KLBS
- NOVOS AND SOFTSPEED ENABLED
- SURVEY EVERY STAND
- ECD ACTUAL = 11.1 PPG EMW
- MUD WEIGHT IN/OUT =10.5 PPG
REDUCE FLOW RATE FROM 650 GPM
(4325 PSI) TO 620 GPM (4100 PSI) AT
8090' MD TO DECREASE PUMP
PRESSURE.
AT 8220' MD INCREASE MUD WEIGHT
FROM 10.3 PPG TO 10.5 PPG WITH
BLACK PRODUCT ADDITIONS PER PLAN
PRIOR TO ENTERING THE HRZ.
HRZ AT 8484' MD (7786' TVD)
N.S. SR. WSL, JAY MURPHY, AND RIG
LEADERSHIP HELD SAFETY MEETINGS
WITH BOTH CREWS TO REVIEW
OPERATION DISCIPLINE, RECENT
INCIDENTS AND A VIDEO ON THE PIPER
ALPHA.
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths'
North America - ALASKA - BP Page 15 of 53
Operation Summary Report
Common Well Name: 14-16 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/24/2017 End Date. X3-0189M-C: (7,812,778 23)
Project: Prudhoe Bay Site: PB DS 14
Rig Name/No.. PARKER 272 Spud DateMme: 8/11/1981 12:00:OOAM Rio Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI USA00000813
Active datum: 14-16B Actual 088.71usft (above Mean Sea Level)
Date From - To Hrs
Phase Task
Unit or Code NPT NPT Description of Operations
(hr)
_ _
Rotary Depth _..__ _. _. _. _._
72:00 - 00:00 12.00
INTI DRILL
RIG P DRILLAHEAD IN B -1/2"X9-7/8"
INTERMEDIATE HOLE FROM 8500' MD TO
9285' MD (8242' TVD) IN THE HRLKNG
FORMATION (785 FT IN 12 HOURS = 65
j
FT/HR WITH CONNECTIONS)
- 590 GPM, 4360 PSI ON BOTTOM, 4320
PSI OFF BOTTOM
- 180 RPM, 10 KFT-LBS TORQUE ON
BOTTOM, 8 KFT-LBS TORQUE OFF
BOTTOM, 12-15 KLBS WOB
- PU = 220 KLBS, SO = 147 KLBS, ROT =
158 KLBS
- NOVOS AND SOFTSPEED ENABLED
'- SURVEY EVERY STAND
- ECD ACTUAL= 11.4 PPG EMW
- MUD WEIGHT IN/OUT = 10.5 PPG
REDUCE FLOW RATE FROM 620 GPM
(4380 PSI) TO 600 GPM (4246 PSI) AT
8573' MD TO DECREASE PUMP
PRESSURE
REDUCE FLOW RATE FROM 600 GPM
(4411 PSI) TO 590 GPM (4330 PSI) AT
9130' MD TO DECREASE PUMP
PRESSURE
10/3/2017 00:00 - 02:30
2.50
INTI DRILL
RIG P DRILLAHEAD IN B -1/2"X9-7/8"
INTERMEDIATE HOLE FROM 9285' MD TO
9474' MD (8644' TVD) IN THE KNG
FORMATION (189 FT IN 2.5 HOURS = 758
FT/HR WITH CONNECTIONS)
- 570 GPM, 4280 PSI ON BOTTOM, 4250
PSI OFF BOTTOM
- 180 RPM, 11 KFT-LBS TORQUE ON
BOTTOM, 8 KFT-LBS TORQUE OFF
BOTTOM, 15 KLBS WOB
- PU = 235 KLBS, SO = 142 KLBS, ROT =
160 KLBS
- NOVOS AND SOFTSPEED ENABLED
- SURVEY EVERY STAND
- ECD ACTUAL= 11.4 PPG EMW
- MUD WEIGHT IN/OUT = 10.5 PPG
TSAG CASING PICK STRATEGY: DRILL
187' TVD (218' MD) PAST TJB MARKER IF
REVERSE DRILLING BREAK NOT
OBSERVED AND CONFIRM WITH
SAMPLES.
- TJBAT 9257' MD (8457' TVD_)
0230 - 0330 1.00
INTI DRILL
RIG P CIRCULATE SAMPLES FOR GEOLOGY
- 566 GPM; 4090 PSI
- UNABLE TO CONFIRM TSAG WITH
SAMPLES CIRCULATED.
110330 - 0500 1.50
INTI DRILL
RIG P DRILL 4'MD TO 9478' MD 18648- TVD) AND
CIRCULATE SAMPLES FOR GEOLOGY TO
CONFIRM SAG RIVER SANDS
- 565 GPM; 4095 PSI
-CONFIRM GLAUCONITIC SANDSTONE
IN SAMPLES
RIG GEOLOGISTS CALL INTERMEDIATE
INTERVALTD AT 9478' MD (8648' TVD)
'All depths reported in Drillers Depths'
Project: Prudhhoeoe B -
Bay
Site'. PB DS 14
North America - ALASKA - BP
Page 16 of 53
Operation Summary Report
Spud Date(Time: 8/11/1981 12:00 OOAM
- -
Common Well Name: 14-18
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/24/2017 Eno Date.
X3 -0189M -C: (7,812,778.23)
Project: Prudhhoeoe B -
Bay
Site'. PB DS 14
Rig Name/No.: PARKER 272
Spud Date(Time: 8/11/1981 12:00 OOAM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-16B Actual @88.7lusft (above Mean Sea Level)
Date From - To Him
Phase Task
Unit or Code NPT
NPT Description of Operations
(hr)
Rotary
Depth
05:00 - 09:00 4.00
INT1 DRILL
RIG P
CIRCULATE THEWELLCLEANATTD
09:00 - 12'.00 3.00 INTI DRILL RIG
1200'. - 12:30 0.50 INT1 DRILL RIG
12:30 - 14:00 1.50 INTI DRILL RIG
14'.00 - 14'.30 0.50 INTI DRILL RIG
- DROP BALL AND CLOSE
UNDERREAMER PER NOV
REPRESENTATIVE
- 620 GPM; 4375 PSI ICP, 4278 PSI FCP
- 180 RPM, 10 KFT-LBS TORQUE
PUMPED 35 BBL HI VIS SWEEPS,
MINIMAL INCREASE IN CUTTINGS
PUMPED LOW VIS / HI VIS TANDAM
SWEEP, 25% INCREASE IN CUTTINGS
P PULL OUT OF THE HOLE ON ELEVATORS
FROM 9478' MD TO 4519' MD
- MONITOR THE WELL FOR 10 MIN PRIOR
TO PULLING OFF BOTTOM; STATIC
- PU= 245 KLBS; SO= 140 KLBS AT 9478'
MD
- MUD WEIGHT IN/OUT 10.5 PPG
- HOLE TAKING PROPER FILL.
P ATTEMPT TO CIRCULATEA BOTTOMS UP
AT 4519' MD
- 725 GPM, 3770 PSI
- 150 RPM, 7 KFT-LBS TORQUE
- LOST ALL RETURNS AFTER PUMPING
19 BBLS
SHUT DOWN AND FLOW CHECKED
WELL. OBSERVED SIGNS OF FLOW AND
CLOSED ANNULAR. NS SR. WSL WAS ON
RIG FOR WSL CHANGE OUT AND MADE
NOTIFICATIONS OF POTENTIAL
WELLBORE BREATHING TO WSUP AND
WOM,
N DPRB 4,519.00 PERFORM EXHALE TEST WITH 1 BBL
BLEEDS THROUGH MUD GAS
SEPARATOR PER WELLBORE
BREATHING RP TO DETERMINE IF FLOW
WAS A RESULT OF INDUCED
BREATHING.
- SHUT-IN CASING PRESSURE 0 PSI
- LINED UP THROUGH THE MUD GAS
SEPARATOR TO ATRIP TANKAND FLUID
PACKED ALL LINES.
OPENED CHOKE AND ATTEMPT TO BLED
OFF 1 BBL -NO FLOW
DISCUSS RESULTS OF EXHALE TEST
WITH WSUP.
OPEN ANNULAR AND FILL HOLE WITH
HOLE FILL PUMP
- 7 BBLS TO FILL HOLE
- MONITOR WELL FOR 10 MIN; STATIC
P CIRCULATE 2 BOTTOMS UPAT 4519' MD
- 650 GPM, 3100 PSI
- 150 RPM, 7 KFT-LBS TORQUE
- NO LOSSES OBSERVED DURING
CIRCULATION
- MONITOR WELL FOR 10 MIN; STATIC
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths'
Common Well Name. 14-16
Event Type: RE-ENTER- ONSHORE (RON)
Project: Prudhoe Bay
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLING CO.
North America - ALASKA - BP Page 17 of 53
Operation Summary Report
Start Date. 9/24/2017 End Data
Site: PB DS 14
Active datum: 14-16B Actual @88.71 usft (above Mean Sea Level)
Date From - To Hrs Phase Task
- (hr)
14:30 - 19:00 4.50 INT1 DRILL
1900. - 2000 1.00 INT1 DRILL
20:00 - 00:00 4.00 INTI
AFE No
X3 -0189M -C'. (7,812,778.23 )
BPUOI: USA00000813
Unit or
Code NPT
NPT Description of Operations
Rotary
Depth
RIG
P
RUN IN THE HOLE ON ELEVATORS FROM
4519' MD TO 9478' MD
- PU= 129 KLBS, SO= 109 KLBS AT 4519'
MD
- WASH DOWN LAST STAND AT 1
BBUMIN; NO FILL NOTED ON BOTTOM
RIG
P
ATTEMPTTO CIRCULATE BOTTOMS UP
AT TD
- STAGE UP PUMPS TO 550 GPM, 4031
PSI
LOST RETURNS:
- DYNAMIC LOSS RATE = 260-300 BPH
- STATIC LOSS RATE = 28 BPH
NOTIFIED ODE, NS SR. WSLAND WSUP
OF CONDITIONS
DRILL RIG N DPRB, 9,478.00 ATTTMEPT TO CONTROL LOSSES AND
DETERMIN LOST CIRCULATION ZONE
PUMP 80 BBL, 40 LB/BBL DRILLAHEAD
LCM PILLAT 5 BPM, 900 PSI TO THE BIT
- REDUCE PUMP RATE TO 2.5 BPM, 438
PSI UNTIL LCM PILL CLEARS THE DRILL
STRING
- CONTINUE PUMPING AT4 BPM, 673 PSI
FOR 570 BBLS - NO RETURNS
- 60 RPM, 10 KFT-LBS TORQUE AND
RECIPROCATING PIPE 85'
- DYNAMIC LOSS RATE = 260 BPM
- STATIC LOSS RATE = 28 BPH
NOTIFY ODE OF RESULTS
PUMP A SECOND 80 BBL 40 LB/BBL DRILL
AHEAD LCM PILLAT 5 BPM, 947 PSI TO
THE BIT
- REDUCE PUMP RATE TO 2.5 BPM, 445
PSI
- 60 RPM, 10 KFT-LBS TORQUE AND
RECIPROCATING PIPE 85'
Printed 11/6/2017 1 32:27PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 14-16 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/24/2017 Eno Date: X3 -0189M -C: (7,812,778,23)
Proied: Prudhoe Bav Site: PB DS 14
Page 18 of 53
Rig Contractor PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-16B Actual @88.71 usft (above Mean Sea Level)
Date From - To Him Phase Task
Unitor Code NPT NPT
Desorption of Operations
(hr)
_ RotaryDepth
1014/2017 0000 - 05:00 5.00 INT1 DRILL
RIG N DPRB 9,478.00
CONTINUE CIRCULATING LOST
CIRCULATION MATERIAL TO CONTROL
-
AND EVALUATE LOSSES
PUMP SECOND 80 BBL 40 PPB DRILL
AHEAD LCM PILL; 2.5 BPM, 445 PSI, 60
RPM, 10 KFT-LBS TORQUE
- RECIPROCATE 85' INTERVAL WHILE
CIRCULATING
-OBSERVED DECREASE IN DYNAMIC
LOSS RATE FROM 260 BPH TO 90-150
BPH WITH LCM PILLAT DEPTHS 5800' MD
TO 6800' MD; REGAIN PARTIAL RETURNS
- TAKE STATIC LOSS RATE = 3 BPH
PUMP THIRD 80 BBL 40 PPB DRILL
AHEAD LCM PILL; 2 BPM, 384 PSI, 60
RPM, 10 KFT-LBS TORQUE
- RECIPROCATE 85SECTION WHILE
CIRCULATING
- PRIOR TO LCM PILL EXITING BIT, LOSS
RATE BEGAN TO DECREASE. WITH LCM
400' OUTSIDE THE BIT, LOSS RATE FELL
TO 0 BPH.
- OBSERVE PIT GAIN AND INCREASE IN
FLOW OUT PERCENTAGE, SHUT DOWN
AND MONITOR WELL. WELL FLOWING.
SHUT-IN WELLATANNULAR
PREVENTER.
- PIT GAIN = 13 BBLS, SIDP = 90 PSI, SICP
= 70 PSI
Printed 11/6!2017 1:32:27PM *All depths reported in Drillers Depths'
North America -ALASKA - BP Page 19 of 53
Operation Summary Report
Common Well Name: 14-16 AFE No
Event Type'. RE-ENTER- ONSHORE (RON) Start Date 9/24/2017 End Date. 'X3 -0189M -Q (7,812,778.23)
Project: Prudhoe Bay Site: PB DS 14
Rig Name/No.: PARKER 272 Spud Date/Time: 8/11/1981 12:00:OOAM Rig Release: 10/24/2017
Give datum: 14-16B Actual @88.71 us8 (above Mean Sea Level)
Date From - To Him Phase Task Unitor Code NPT NPT
Description of Operations
(hr) _ Rotary Depth
05:00 - 09:00 4.00 INTI DRILL RIG N DPRB 9,478.00
PERFORM EXHALE TEST
- NOTIFY WSUP OF SHUT-IN; BREATHING
SUSPECTED DUE TO LOST CIRCULATION
AND PRIOR BREATHING ON THIS HOLE
SECTION
- APPROVAL GIVEN TO PERFORM
EXHALETEST
- WHILE MAKING NOTIFICATIONS AND
DISCUSSING PLAN FORWARD WITH
ANCHORAGE TEAM, PRESSURE BLED
TO SICP = 60 PSI, SIDP = 40 PSI
EXHALE TESTAS FOLLOWS:
- 8.0 BELS, 3:00 MIN, SICP = 60 PSI, SIDP
= 40 PSI
- 6.5 BBLS, 3:10 MIN, SICP = 50 PSI, SIDP
= 40 PSI
- 4.5 BBLS, 3:20 MIN, SICP = 50 PSI, SIDP
= 40 PSI
- 4.0 BBLS, 3:30 MIN, SICP = 50 PSI, SIDP
= 40 PSI
- 4.6 BBLS, 4:30 MIN, SICP = 40 PSI, SIDP
=40 PSI
DECREASING TREND ESTABLISHED.
CONTACT ANCHORAGE TEAM AND
RECEIVE APPROVAL TO OPEN CHOKE
AND BLEED BACK WELL WHILE
MONITORING BBLS / TIME
- BLEED BACK 6 BBLS TOTAL, TIME FOR
EACH BBL 2:30, 1:01, 1:27, 1:37, 1:28, 1:32
MIN
- SHARE RESULTS WITH ANCHORAGE
TEAM, RECEIVE APPROVAL TO
PERFORM ANOTHER BLEED CYCLE
- BLEED BACK 10 BBLS TOTAL, TIME FOR
EACH BBL: 3:26,2:50.2:53,2:08.3:10,
3:24,5:10.6:24.6:40,12:07, FLOW
DIMINISHED
-SHARE RESULTS WITH ANCHORAGE
TEAM, RECEIVE APPROVAL TO OPEN
WELL, MOVE PIPE AND CIRCULATE
_BOTTOMS UP
09:00 - 16:00 7.00 INTI DRILL RIG N DPRB 9,478.00
CIRCULATE HOLE CLEAN AND MANAGE
LOSSES PRIOR TO TRIP
- STAGE UP PUMPS TO 600 GPM IN 0.5 - 2
BPMINCREMENTS
- FINAL RATE AND PRESSURE = 600
GPM, 4300 PSI
- ROTATE AT 80 RPM, 11 KFT-LBS,
RECIPROCATE 85' INTERVAL
- PUMP 40 BBL40 PPB DRILLAHEAD LCM
PILL, NO OBSERVABLE CHANGE IN LOSS
RATE
- FINAL DYNAMIC LOSS RATE = 12 BPH @
590 GPM
1600 - 1630 0.50 INTI DRILL RIG N DPRB 9,478.00
MONITOR WELL PRIOR TO TRIPPING
OUT OF HOLE
- 9.3 BBLS FLOWBACK, WELL IS STATIC
AFTER HOUR
Printed 11/6/2017 1:32:27PM •AII depths reported in Drillers Depths'
NorthAmerica- ALASKA - BP
Operation Summary Report
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/24/2017 End Date.
Project: Prudhoe Bay Site: PB DS 14
Rig Name/No.: PARKER 272 Spud Date/Time: 8/11/1981 12:00 LOAM
Rig Contractor: PARKER DRILLING CO
AFE No
X3 -0189M -C: (7,812,778.23)
Rig Release: 10/24/2017
Page 20 of 53
Active datum: 14-16BActual @88.71usft (above Mean Sea Level)
Date From - To Hrs Phase Task Unit or Code NPT NPT Description of Operations
(hr) Rotary Depth
16:30 - 00:00 7.50 INTI DRILL RIG P FINALTRIP. PULLOUT OFHOLE WITH
10/5/2017
0000
- 0200
2.00
INTI
DRILL
RIG P
02'.00
i
- 04:30
2.50
INTI
BOPSUR
I
RIG P
04.30 - 0600 1.50 INT1 CASING RIG
06.00 - 07:00 1.00 INTI CASING RIG
P
P
'All depths reported in Drillers Depths'
8-1/2" X 9-7/8" DRILLING ASSEMBLY
FROM 9478' MD TO TOP OF BHA AT 567'
MD ON ELEVATORS
- FINAL PICKUP / SLACKOFF WEIGHTS
ON BOTTOM = PU 230 KLBS, SO 150
KLBS
- MONITOR WELL VIA TRIP TANK (MINOR
LOSSES < 5 BPH)
- MW 10.5 PPG IN / OUT
- PULLING SPEED = 20-80 FPM IN OPEN
HOLE, 120 FPM IN CASED HOLE
- NO ISSUES WHILE TRIPPING
- MONITOR WELL FOR 10 MIN AT 9-5/8"
WINDOW, 6 BPH STATIC LOSSES
LAY DOWN 8-112"X 9-7/8" DRILLING
ASSEMBLY FROM 567' MD TO SURFACE
- FLOW CHECK WELL FOR 10 MIN PRIOR
TO PULLING NON-SHEARABLES
THROUGH STACK, STATIC
- NO PLUGGED NOZZLES OR
OBSTRUCTIONS IN BHA
-BIT GRADED 2 -2 -WT -G -X -IN -CT -
TD
- UNDERREAMER GRADED 3 -2 -BT -A -
.X -I -WT -TD
CHANGE UPPER BOPE RAMS FROM
2-7/8" X 5" VBRS TO 7" FBRS
- RIG UP HOSE TO IA TO FILL WHILE
CHANGING RAMS AND TESTING BOP
(MONITORED 10.5 PPG LSND KWF)
- PULL WEAR RING AND SET TEST PLUG,
RUN IN LOCKDOWN SCREWS AND
TORQUE TO SPEC
FUNCTION TEST BLIND / SHEAR AND
UPPER RAMS AS PART OF WEEKLY
FUNCTION TEST.
PRESSURE TEST 7"FBRS, ANNULAR
PREVENTER AND HORS TO 250 PSI LOW
/ 3500 PSI HIGH FOR 5 MIN EACH
- PRESSURE TEST 7" FBRS WITH T' TEST
JOINT
- PRESSURE TESTANNULAR
PREVENTER WITH 4" AND 7" TEST JOINT
- ANNULAR AND HORS TESTED FOR
WELL SHUT-IN PER AOGCC
REGULATIONS (AOGCC REP GUY COOK
WAIVED WITNESS 10/3/17 @ 17:24)
-ALL TESTS PASS
-SEE ATTACHED PRESSURE TEST
CHART
RIG UP TO RUN 7" CASING
- MAKE UP VOLANT TOOLAND BAIL
EXTENSIONS
- MAKE UP SHEAR JOINT AND TESTED
FOSV
-RIG UP DOYON CASING EQUIPMENT
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE(RON)
Project: Prudhoe Bay
Rig Name/No.: PARKER 272
North America - ALASKA - BP
Operation Summary Report
Start Date: 9/24/2017 End Date
Site: PB DS 14
Spud DaterTlme: 8/11/1981 12:00:OOAM
Active datum. 14-168 Actual @88.71usR (above Mean Sea Level)
Date From - To His Phase Task Unit or Code NPT
(hr) Rotary
07:00 - 00:00 17.00 INTI CASING RIG P
10/6/2017 00:00 - 05:30 5.50 INT1 CASING RIG P
05:30 - 10:00 4.50 INTI CASING RIG N WAIT
Page 21 of 53
AFE No
X3 -0189M -C:(7,812,778,231
Rig Release: 10/24/2017
NPT
Description of Operations
Depth
RUN 7",26#, L-80, VAM TOP HC
INTERMEDIATE LONG STRING FROM
SURFACE TO 7413' MD (JOINT 177) AT
MIDNIGHT
- FLOW CHECK WELL PRIOR TO
RUNNING IN HOLE (STATIC)
- MAKE UP SHOE TRACK(BAKERLOK
CONNECTIONS) AND CHECK FLOATS
(PASS)
- APPLY JET LUBE SEAL GUARD DOPE
AND TORQUE TURN ALL VAM TOP HC
CONNECTIONS TO OPT MU TORQUE
. 11950 FT -LBS. MAKEUP JOINTS WITH
DOUBLE STACK TONGS.
- RUNNING SPEED IN CASED HOLE _
70-110 FPM, OPEN HOLE = 30-70 FPM
- VAM REPRESENTATIVE VERIFY
TORQUE -TURN GRAPHS AND INSPECT
CONNECTIONS AS NECESSARY
- RUN 34 FREE FLOATING 9-5/8" X 12"
CENTRALIZERS (SHOE TRACK, JOINTS
1-31)
- FILL CASING ON FLY, TOP OFF EVERY
10 JOINTS
- CIRCULATE BOTTOMS UP AT 9-5/8"
WINDOW, 10 BPM, 360 PSI
-CIRCULATE EVERY 10TH JOINT DOWN
WITH 3-5 BPM FOR 5 MIN; PARTIAL
RETURNS WHILE CIRCULATING
- CIRCULATE S CONSECUTIVE JOINTS
DOWN AT JOINT 175 (7333' MD) AT 3 BPM;
PARTIAL RETURNS WHILE CIRCULATING.
- DECISION MADE TO FORGO BOTTOMS
UPAT THRZ IN ORDER TO MAINTAIN
ADEQUATE MUD VOLUME. HOLE
CONDITIONS DO NOT INDICATE NEED
FOR ADDITIONAL CIRCULATING.
-PUSHING AWAY FLUID DURING RUN
(FINAL VALUE TO BE REPORTED AT END
OF RUN)_
RUN 7", 26#, L-80, VAM TOP HC
INTERMEDIATE LONG STRING FROM
7413' MD TO PLANNED SET DEPTH OF
9476' MD
- SEE DETAILS OF RUN ON PREVIOUS
TIME ENTRY
- TAG SECTION TD AT 9478' MD AND PICK
UP TWO FEET OFF BOTTOM
- FINAL PICKUP / SLACK OFF WEIGHTS
AT TD: PU 320 KLBS / SO 160 KLBS
- TOTAL OF 479 BBLS LOST FOR CASING
RUN
9,478.00
CIRCULATE AND WAIT ON FLUID
SUPPORT FROM LIQUID MUD PLANT
- ATTEMPT TO STAGE UP PUMPS TO
CONDITION WELL PRIOR TO CEMENT
JOB. SEVERITY OF LOSSES GREATER
THAN EXPECTED. CALL OUTADDITIONAL
FLUID FROM MUD PLANT TO ENSURE
ADEQUATE FLUID ON LOCATION.
- 2 BPM, 230 PSI, 60 BPH LOSS RATE
Printed 11/612017 1:3227PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 14-16 AFE No
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 9/24/2017 Ertl Date X3 -0169M -C (7,812,77823)
Project: Prudhoe Bay Site: PB DS 14
Page 22 of 53
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11/1981 12:o0:00AM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI USA00000813
Active datum: 14-168 Actual (Q88.71 usft (above Mean Sea Level)
Date From - To Him
Phase Task
Unit or
Code NPT
NPT
Description of Operations
(hr)
Rotary_
_ _ '_
Depth
10:00 - 11:00 1.00
INTI CASING
RIG
N WAIT
9,478.00
STAGE UP PUMPS TO CEMENTING RATE
OF 5 BPM IN 0.5-1 BPM INCREMENTS
- CIRCULATE 150 BELS (1.5 X GAUGE
HOLE VOLUME) CLEAN FLUID BETWEEN
TSGR AND CM2
-LOSS RATE 290 BPH AT 5 BPM
1100 - 16.00 5.00
INTI CASING
RIG
N WAIT
9,478.00
WAIT ON FLUID SUPPORT FROM LIQUID
MUD PLANT
- CIRCULATE AT 1 BPM FOR 5 MIN EVERY
30 MIN
- RECIPROCATE PIPE STRETCH WHILE
WAITING
16:00 - 17:00 1.00
INTI CASING
RIG
P
STAGE UP PUMPS TO CEMENTING RATE
OF 5 BPM IN 0.5 BPM INCREMENTS
- 1-5 BPM, 350450 PSI
- LOSS RATE 250 BPH AT 5 BPM
- CLOSE TO 100% LOSSES WITH
TRICKLE OF FLUID MOVEMENT
OBSERVABLE IN POSSUM BELLY
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths`
Common Well Name'. 14-16
Event Type: RE-ENTER- ONSHORE(RON)
Prudhoe B;
NorthAmerica- ALASKA - BP
Operation Summary Report
Start Date: 924/2017 Eno Date
Site' PB DS 14
Scud Date/Time: 8/11/1981 12.00.00AM
Active datum: 14-168 Actual @88.71 usft (above Mean Sea Level)
Date From - To Him Phase Task Unit or Code NPT
(hr)_.. __ _ Rotary .
17.00 - 19:30 2.50 INTI CASING RIG P
Printed 1116/2017 1'. 32 27P *All depths reported in Drillers Depths'
Page 23 of 53
AFE No
X3 -0189M -Q (7,812,778.23)
Rig Release: 10/24/2017
NPT Description of Operations
Depth
CEMENT 7" INTERMEDIATE CASING AS
FOLLOWS:
- FILL LINES WITH WATER AND
PRESSURE TEST TO 4300 PSI FOR 5
MINUTES
- PUMP 35 BBLS OF 12 PPG MUDPUSH II
SPACER AT 5 BPM, ICP 400 PSI, FCP 275
PSI
- UNSTING VOLANT TOOLAND RELEASE
BOTTOM PLUG
- PUMP 84 BBLS OF 15.8 PPG CLASS G
TAILAT 5 BPM, EXCESS VOLUME 40%
(YIELD 1.17 CU.FT/SK), ICP 600 PSI, FCP
290 PSI
-DROP TOP PLUG
-SCHLUMBERGER CEMENTERS KICK
OUT PLUG WITH 10 B81- WATER
- PERFORM DISPLACEMENT WITH RIG
PUMPS AND 10.5 PPG 1 -SND MUD PER
SLB CADE
- 225 BBLS DISPLACED AT 5 BPM: ICP 75
PSI, FCP 75 PSI (DID NOT CATCH
PRESSURE)
- REDUCE RATE FOR MUDPUSH EXITING
SHOE. 10 BBLS DISPLACED AT 3 BPM:
ICP 20 PSI, FCP 20 PSI (DID NOT CATCH
PRESSURE).
- 25 BBLS DISPLACED AT 5 BPM: ICP 75
PSI, FCP 75 PSI (DID NOT CATCH
PRESSURE)
- REDUCE RATE FOR BOTTOM PLUG
LANDING AND CEMENT EXITING SHOE.
10 BBLS DISPLACED AT 3 BPM: ICP 20
PSI, FCP 20 PSI (DID NOT CATCH
PRESSURE).
- BOTTOM PLUG LANDS AT 2808
STROKES (58 STROKES / 5.4 BBLS
EARLY)
- 65 BBLS DISPLACED AT 5 BPM: ICP 90
PSI, FCP 850 PSI
- REDUCE RATE FOR PLUG BUMP. 11
BBLS DISPLACED AT 2 BPM: ICP 700 PSI,
FCP 800 PSI
- BUMP PLUG AND INCREASE PRESSURE
TO 1300 PSI, CHECK FLOATS - GOOD
- TOTAL DISPLACEMENT VOLUME 359.5
BBLS(MEASURED BY STROKES AT 97%
PUMP EFFICIENCY)
- RECIPROCATE PIPE STRETCH FOR
DURATION OF THE JOB
- TOTAL LOSSES FROM CEMENT EXIT
SHOE TO CEMENT IN PLACE: 81 BBLS
(FULL LOSSES). LOSS ZONEABOVE
CEMENTED INTERVAL, AND WILL NOT
AFFECT ISOLATION. OBSERVE TRICKLE
OF FLUID MOVING IN POSSUM BELLY
THROUGHOUT JOB, HOLE STAYING
FULL.
- TOTAL LIFT PRESSURE = 860 PSI
- CEMENT IN PLACE AT 19:27
- WELL STATIC AFTER CEMENT JOB
- FIELD PICK TOP OF CEMENT = 8175' MD
'All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 24 of 53
Operation Summary Report
Common Well Name: 14-16
AFE No
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 9/24/2017 Eno Date:
X3 -0189M -C:(7,812,77823)
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11/1981 12:00:00AM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-16B Actual @88.71 us8 (above Mean Sea Level)
Date From - To Hrs
Phase Task Unit or Code NPT NPT
Description of Operations
(hr)
Rotary Depth
(AS PLANNED WITH 40% HOLE
_
WASHOUT) _
19:30 - 21:00 1.50
INT1 CASING RIG P
PRESSURE TEST 7" INTERMEDIATE
CASING WITH 10.5 PPG _SND TO 3500
PSI FOR 30 MIN (TEST FAILED)
- PRESSURE INCREASED BY 40 PSI
OVER 40 MIN (THERMAL EFFECTS OF
CEMENT SETTING UP)
- PUMP AND BLEED BACK 5 BBLS
- TEST REJECTED BY WSLAND WSUP
DELEGATE
- CASING WILL BE RE -TESTED WHEN
CEMENT REACHES 500 PSI
21.00 - 00 00 3.00
INTI CASING RIG P
MONITOR WELLAND WAIT ON CEMENT
PRIOR TO BREAKING CONTAINMENT TO
SET 7" CASING ON SLIPS
- COMPRESSIVE STRENGTH OF 200 PSI
REQUIRED FOR BREAKING
CONTAINMENT WILL BE REACHED AT
04:00 HRS ON 10/7/17
- 12 HR MONITORING PERIOD WILL BE
COMPLETE AT 08:37 HRS ON 10!//17 (3 X
AMOUNT OF TIME TO COMPLETE
BREAKING CONTAINMENT WORK)
SIMOPS:
- PERFORM PREVENTATIVE
MAINTENANCE AND GENERAL
HOUSEKEEPING THROUGHOUT RIG
- RINSE CEMENT MANIFOLD
-CONSOLIDATE 10.5 PPG LSNDAND
CLEAN PITS.
10/7/2017 00.00 - 06.30 6.50
INTI CASING RIG P
MONITOR WELLAND WAIT ON CEMENT
PRIOR TO BREAKING CONTAINMENT TO
SET 7" CASING ON SLIPS
- COMPRESSIVE STRENGTH OF 200 PSI
REQUIRED FOR BREAKING
CONTAINMENT WILL BE REACHEDAT
04:00 HRS ON 1017117
- 12 HR MONITORING PERIOD WILL BE
COMPLETE AT 08:37 HRS ON 10/7/17 (3 X
AMOUNT OF TIME TO COMPLETE
BREAKING CONTAINMENT WORK)
SIMOPS:
- BUILD STANDS OF 4" HWDP OFFLINE
- PREP WELL HOUSE FOR WELLHEAD
WORK
'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 14-16
Event Type. RE-ENTER- ONSHORE (RON) Start Date: 9/24/2017 End Date
Project: Prudhoe Bay Site: PB DS 14
AFE No
X3 -0189M -C: (7,812,778.23 )
Page 25 of 53
Rig Contractor PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-168 Actual @88.71 usft (above Mean Sea Levey
Date From - To
Him
Phase
Task Unit or Code NPT
NPT Description of Operations
(hr)
Rotary
Depth
06:30 - 07:30
1.00
INTI
CASING RIG P
CONTINUE TO MONITOR THE WELL
PRIOR TO BREAKING CONTAINMENT
PER GWO ALASKA REGION SOP:
SETTING CASING SLIPS ON
INTERMEDIATE AND PRODUCTION
CASING
- 12 HR MONITORING PERIOD WILL BE
COMPLETE AT 08:37 HRS ON 1017117 (3 X
AMOUNT OF TIME TO COMPLETE
BREAKING CONTAINMENT WORK)
SIMOPS:
- PRESSURE TEST 7" INTERMEDIATE
CASING 250/3500 PSI FOR 5/30 CHARTED
MIN
- REVIEW PRESSURE CROSSCHECK
CHECKLIST
- GOOD TEST; TEST MET BP TESTING
CRITERIA PER BP PRACTICE 100218
- ACTING WSUP APPROVED TEST.
- SEE ATTACHED TEST CHARTAND TEST
CRITERIA CALCULATOR.
0730 - 0900
1.50
INTI
CASING
RIG P
CONTINUE TO MONITOR THE WELL
PRIOR TO BREAKING CONTAINMENT
PER G WO ALASKA REGION SOP:
SETTING CASING SLIPS ON
INTERMEDIATE AND PRODUCTION
CASING
- 12 HR MONITORING PERIOD WILL BE
COMPLETE AT 08:37 HRS ON 1017/17 (3 X
AMOUNT OF TIME TO COMPLETE
BREAKING CONTAINMENT WORK)
SIMOPS:
- CONTINUE TO PREP WELL HOUSE AND
BOP DECK FOR UPCOMING WELLHEAD
WORK
09:00 - 11:00
2.00
INT1
CASING RIG P
SPLIT BOP STACK FOR WELLHEAD
WORK
- SUCK OUT STACK AND T' CASING FOR
CUT
- NIPPLE DOWN AND SPLIT STACK FROM
WELLHEAD SPOOL.
11:00 - 1200
1.00
INTI
WHSUR RIG P
INSTALL CASING SLIPS ON 7" CASING IN
CASING SPOOL PER CAMERON
WELLHEAD REPRESENTATIVE
- PULL 80K OVER ON STRING
- INSTALL CASING SLIPS AND SLACK OFF
ON 7" CASING.
12.00 - 14:00
2.00
INTI
CASING RIG P
PERFORM WACHS CUT ON 7" CASING
2.5" ABOVE FLANGE ON CASING SPOOL
PER CAMERON WELLHEAD
REPRESENTATIVE
- RIG UP WACHS CUTTER ON 7" CASING
JOINT
- CUT 7" CASING PER CAMERON
REPRESENTATIVE.
Printed 11/62017 1:32:27PM •AAI depths reported in Drillers Depths'
Printed 11/6/2017 1:32'.27PM 'All depths reported in Drillers Depths'
North America -ALASKA - 813
Page 26 of 53
Operation Summary Report
Common Well Name: 14-16
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date. 9/24/2017 End Date
X3 -0189M -C: (7,812,778.23 )
Project: Pau has Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Daterrime: 8/11/1981 12:00 OOAM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-16B Actual @88.71 usft (above Mean Sea Level)
Date From - To Hrs
Phase Task Unit or Code NPT NPT
Description of Operations
_ (hr)_
Rotary Depth
14:613_ -MO 4.00
INTI WHSUR RIG P
NIPPLE DOWN BOPE STACKAND HIGH
PRESSURE RISER, INSTALL NEWT'
PACK-OFFAND NEW TUBING SPOOL.
- BREAK OUT 7" CUT JOINTAND LAY
DOWN TO PIPE SHED
- RIG DOWN VOLANT TOOLAND BAIL
EXTENSIONS
- NIPPLE DOWN BOP STACK AND SET
BACK ON STUMP
- PULL HIGH PRESSURE RISER AND
DROP OFF BOTTOM 24" SPACER SPOOL
INSTALL NEW 13-5/8" x 7" PACK -OFF AND
NIPPLE UP NEW TUBING SPOOL PER
CAMERON WELLHEAD
REPRESENTATIVE AND RUN IN LOCK
DOWN SCREWS
SIMOPS:
- CHANGE OUT UPPER RAMS IN BOP
STACK WHILE STOOD BACK ON STUMP
FROM 7"FBR TO 2-7/8"x 5'VBR.
111 - 19.00 1.00
INT1 WHSUR RIG P
PRESSURE TEST NEW SPOOL AND
13-5/8" x 7" PACK -OFF PER CAMERON
WELLHEAD REPRESENTATIVE
- 3500 PSI FOR 15 MIN (OCN #4)
- REVIEW PRESSURE CROSSCHECK
CHECKLIST
- GOOD TEST; TEST MET BP TESTING
CRITERIA PER BP PRACTICE 100218
-ACTING WSUP APPROVED TEST.
- SEE ATTACHED TEST CHART
1900 - 2230 3.50
INTI BOPSUR RIG P
NIPPLE UP HIGH PRESSURE RISER AND
BOP STACK
- NIPPLE UP HIGH PRESSURE RISER
- NIPPLE UP BOP STACK ON RISER
- INSTALL LOW PRESSURE RISER,
FLOWLINE AND PITCHER NIPPLE
- INSTALL SECONDARY IA VALVE ON
NEW TUBING SPOOL
- AIR UPALLAIRBOOTS
22.30 - 0000 1.50
INT1 BOPSUR RIG P
RIG UP TO TEST BOPE
-MAKE UP TEST JOINT
- INSTALL TEST PLUG
- FILL STACKAND PURGE SYSTEM OF
AIR
- MAKE UP TEST MANIFOLD ON RIG
FLOOR
-PERFORM SHELL TEST ON STACKAND
RISER
Printed 11/6/2017 1:32'.27PM 'All depths reported in Drillers Depths'
Common Well Name: 14-16
Event Type. RE-ENTER- ONSHORE(RON)
North America - ALASKA - BP
Operation Summary Report
Start Date: 9/24/2017 End Date.
Site: PB DS 14
AFE No
X3-0189WC: (7,812,77823)
Rig Name/No.'. PARKER 272 Spud DaleTme: 8/11/1981 12:00:00AM Rig Release: 10/24/2017
Page 27 of 53
Rig Contractor: PARKER DRILLING CO.
BPUOL USA00000813
Active datum: 14-16B Actual @88.71 usft (above Mean Sea Level)
Date From - To
His
Phase
Task
Unit or Code NPT
NPT Description of Operations
(hr)
_
Rotary
Depth
10/8/2017 0000 - 0330
3.50
INTI
BOPSUR
RIG P
TEST ROPE: 250/3500 PSI FOR 5
CHARTED MIN EACH
- TEST ANNULAR WITH 2-7/8" TEST JOINT
- TEST UPPER AND LOWER PIPE RAMS
WITH 2-7/8" AND 4-1/Z' TEST JOINT
- TEST ALL CHOKE MANIFOLD VALVES,
VALVES #6,8,9 AND 12 TESTED FROM
BOTH DIRECTIONS
-TEST BLIND/SHEAR RAMS
- PERFORM ACCUMULATOR DRAW
DOWN TESTAND OPERATE ALL RAMS
FROM BOTH REMOTE STATIONS
- SEE ATTACHED TEST CHARTS
03:30 - 04:30
1.00
INTI
WHSUR
RIG P
PULL TEST PLUG AND INSTALL WEAR
RING
- BLOW DOWN SURFACE LINES AND
TEST EQUIPMENT
- DRAIN STACKAND PULL TEST PLUG
- RUN IN AND INSTALL 8-7/8" ID WEAR
RING AND RUN IN LOCK DOWNS
SIMOPS:
- RIG UP LINE FROM FREEZE PROTECT
MANIFOLD TO IA _
04:30 - 0500
0.50
INTI
WHSUR
RIG P
OPERATIONAL ASSURANCE TEST ON
SECONDARY IA VALVE ADDED TO NEW
SPOOL
- 250 PSI LOW 3500 PSI HIGH FOR 5
CHARTED MIN EACH.
- REVIEW PRESSURE CROSSCHECK
CHECKLIST WITH DRILLER AND CREW
-GOOD TEST
05.00 - 06'.00
1.00
INTI
WHSUR
RIG P
FREEZE PROTECT 9-5/8" x 7" ANNULUS
- INJECT 42.3 BELS OF 9.8 PPG BRINE;
2.5 BPM, ICP 500, 450 PSI FCP
- INJECT 5.5 BBLS OF 6.8 PPG DIESEL, 1
BPM, ICP 400 PSI,, FCP 400 PSI
0600 - 0700
1.00
INTI
DRILL
RIG P
MAKE UP 6-1/8" BAKER PRODUCTION
HOLE MOTOR BUILD ASSEMBLY FROM
SURFACE TO 143' MD
- NEW SMITH XR20 TRI -CONE INSERT
BIT, BENT MOTOR WITH 1.80° AKO,
PORTED FLOAT, GR/RES
- RUN JARS 3636' BEHIND THE BIT PER
SLB MODELING
- FULL STRING 4" HT -38 DRILL PIPE
- FLOW CHECK WELL FOR 10 MIN PRIOR
TO RUNNING IN HOLE, STATIC
0700 - 11:30
4.50
INTI
DRILL
RIG P
TRIP IN HOLE WITH 6-1/8" DRILLING
ASSEMBLY FROM BHAAT 143' MD TO
9115' MD ON ELEVATORS
- FILL PIPE EVERY 2000' MD
- TRIPPING SPEED = 265 FPM
- MONITOR WELL ON TRIP TANK
(PROPER DISPLACEMENT)
- MUD WEIGHT 10.5 PPG IN/OUT
- SHALLOW HOLE TEST MWD TOOLS AT
1000' MD
- NO ISSUES TRIPPING IN HOLE
Printed 11/6/2017 1.32:27PM *All depths reported In Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 26 of 53
Common Well Name: 14-16
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date9/24/2017 End Date
X3 -0189M -C: (7,812,778.23 )
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11/1981 12:00:OOAM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-16B Actual 088.71 usft (above Mean Sea Level)
Date From - To Him
Phase Task Unit or Code NET
NPT Description of Operations
(hr)
Rotary
Depth
11:30 - 12:30 1.00
INTI DRILL RIG P
WASH DOWN WITH 6-1/8" DRILLING
ASSEMBLY FROM 9115' MD TO 9389' MD
- 2 BPM, 650 PSI, 60 RPM, 8 KFT-LBS
TORQUE
SLOW PUMP RATES @ 9352' MD WITH
10.5 PPG LSND:
MP#1: 30 SPM = 710 PSI, 40 SPM = 940
PSI
MP#2: 30 SPM = 720 PSI, 40 SPM = 960
PSI _
12:30 - 13:30 1.00
INTI DRILL RIG P
DRILL OUT SHOE TRACK CEMENT AND
PLUGS FROM 9389' MD TO 9466' MD (10'
FROM SHOE)
- 250 GPM, 1700-2000 PSI, 35 RPM, 7
KFT-LBS TRQ, 0-3 KLBS WOB
- DID NOT SEE INDICATION OF TAGGING
CEMENT OR PLUGS ON WEIGHT
INDICATOR, BUT OBSERVED YELLOW,
ORANGE AND BLACK RUBBER COMING
ACROSS SHAKERS. HARD CEMENT
ALSO SEEN COMING OVER SHAKERS.
- 35 MIN TO DRILL THROUGH PLUGS,
FLOAT COLLAR AND CEMENT WITH
NEGLIGABLE WEIGHT ON BIT
- CONTACT ODE AND ACTING WSUP
PRIOR TO PERFORMING DISPLACEMENT
1330 - 1500 1.50
INTI DRILL RIG P
DISPLACE WELL FROM 10.5 PPG LSND
TO 8.6 PPG QUIKDRIL-N
- 300 GPM, 1800-2700 PSI (PRESSURES
WITHIN 500 PSI UPPER AND LOWER
BOUNDSACCORDING TO BAROID
DISPLACEMENT MODEL)
- PUMP 40 BBLS 8.5 PPG SEAWATER
SPACER AND 40 BBLS 8.6 PPG HI -VIS
QUIKDRIL SPACER AHEAD OF FULL
HOLE VOLUME OF 8.6 PPG QUIKDRIL
- MONITOR BBL IN AND BBL OUT, ONE
FOR ONE
- NO ROTATION OR RECIPROCATION
DURING DISPLACEMENT
SLOW PUMP RATES @ 9466' MD WITH
8.6 PPG QUIKDRIL-N:
MP#1: 30 SPM = 700 PSI, 40 SPM = 840
PSI
MP#2: 30 SPM = 700 PSI, 40 SPM = 640
_____
PSI
15'.00 - 17:00 2.00
INT1 DRILL RIG P
PERFORM 30 MIN NO -FLOW TEST AFTER
DISPLACEMENT, WELL IS STATIC.
- TEST APPROVED BY WSUP (VERBAL)
- SIMOPS: SLIP AND CUT 10 WRAPS (85')
OF DRILLING LINE, CALIBRATE BLOCKS
_
_
PER MWD REP
17100 - 17:30 0.50
INT1 DRILL RIG P
_
DRILL OUT REMAINING I0'OF SHOE
TRACK AND 2' OF RATHOLE FROM 9466'
MD TO 9478' MD
- 250 GPM, 1400 PSI, 35 RPM, 7 KFT-LBS
TRO, 3-6 KLBS WOB
- PERFORM 15 MIN FLOW CHECK PRIOR
TO DRILLING NEW FORMATION; STATIC
Printed 11/62017 1:3227PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 29 of 53
Common Well Name: 14-16
AFE No
Event Type: RE -ENTER -ONSHORE (RON)
Start Date: 9/24/2017 End Date.
X3 -0189M -C: (7,812,778.23 )
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11/1981 1200:00AM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-168 Actual (4188.71 usft (above Mean Sea Level)
Date From - To Hrs
Phase Task Unit or Code NPT
NPT Description of Operations
(hr)
_ Rotary _ _ _
Depth
1730 - 1830 1.00
INTI DRILL RIG P
DRILL 20' OF NEW FORMATION FROM
9478' MD TO FIT DEPTH AT 9498' MD
- 270 GPM, 1500 PSI, 40 RPM, 7-8
KFT-LBS TRQ, 5 KLBS WOB
18:30 - 19:30 1.00
INTI DRILL RIG P
CIRCULATE BOTTOMS UP TO CONDITION
HOLE PRIOR TO FIT
- 315 GPM, 1800 PSI, NO
RECIPROCATION OR ROTATION
- M W IN/OUT = 8.6 PPG
1930 2000 0.50
INTI DRILL RIG P
PERFORM FIT ON 7" LINER SHOE TO 10.0
PPG
.9476P MD, 8646' TVD, 8.6 PPG MW, 663
PSI APPLIED SURFACE PRESSURE
- PRESSURE BLEEDS FROM 663 PSI TO
630 PSI OVER 10 MIN
- 0.7 BBLS TO PRESSURE UP, 0.7 BBLS
BLED BACK
- OBTAIN AUTHORIZATION TO PROCEED
FROM ODE
- SEE ATTACHED FIT CHART
2000 - 00'00 4.00
PROD1 DRILL RIG P
DIRECTIONAL DRILL6-1/8"PROD HOLE
BUILD SECTION IN SAG RIVER AND
SHUBLIK FORMATIONS FROM 9498' MD
TO 9572' MD (8729' TVD)
- 94' IN 3.5 HRS = 26.9 FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP= 15-30 FPH
- 300 GPM, 1600-1650 PSI OFF BOTTOM,
1730-1800 PSI ON BOTTOM, ROT 40-50
RPM, 7-8 KFT-LBS TRIO, 5-12 KLBS WOB
- MW IN/OUT = 8.6 PPG
- NO LOSSES TO FORMATION WHILE
DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS >
5°/100'
- NO BACKREAMING AT CONNECTIONS
- OBTAIN 1 ST DIRECTIONAL SURVEY -87'
FROM LAST SURVEY IN INTERMEDIATE
HOLE
- DRILLING ON DIRECTIONAL PLAN WITH
NO ISSUES, BUILD INCLINATION FROM
30° TO 34.3°
- 7" LINER SHOE OFFICIALLY LOGGED
AFTER DRILLOUT AT 7497' MD (1'
DIFFERENT THAN LINER TALLY. NO
DEPTH CORRECTIONS MADE TO LINER
TALLY).
-GAS WATCH: AVERAGE BACKGROUND
= 19-40 UNITS, MAXIMUM = 93 UNITS
- SOFTSPEED ACTIVE FOR ROTATING
INTERVALS, NOVOS NOT ACTIVE
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths'
PUMPED 35 BBL HIGH VIS SWEEP AT
9960' MD: NO INCREASE IN CUTTINGS
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 30 of 53
Operation Summary Report
Common Well Name: 14-16
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 9/24/2017 End Date
X3 -0189M -C'. (7,812,778.23)
Project: Prudhoe Bay
Site. PB DS 14
Rig Name/No.: PARKER 272
Spud Daterrime: 8/11/1981 12:00:00AM
Rig Release: 1012412017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-168 Actual @88.71 usft (above Mean Sea Level)
Date From - To Him
Phase Task Unit or Code NPT NPT
Description of Operations
(hr)
_Rotary _ Depth
10/9/2017 0000 - 1200 12.00
PROD1 DRILL RIG P
DIRECTIONAL DRILL 6-1/8" PROD HOLE
BUILD SECTION IN THE SHUBLIKAND
IVISHAK FORMATIONS FROM 9572' MD
TO 9920' MD (8916' TVD)
- 348' IN 12 HRS = 29 FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP = 12-85 FPH
- 300 GPM, 1600-1720 PSI OFF BOTTOM,
1730-1830 PSI ON BOTTOM, ROT 40-50
RPM, 7-14 KFT-LBS TRO, 5-14 KLBS WOB
- MW IN/OUT = 8.6 PPG
- NO LOSSES TO FORMATION WHILE
DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS >
5°1100'
- NO BACKREAMING AT CONNECTIONS
-SLIGHTLYAHEAD OF DIRECTIONAL
PLAN WITH NO ISSUES, BUILD
INCLINATION FROM 34° TO 73°
- GAS WATCH: AVERAGE BACKGROUND
= 20-74 UNITS, MAXIMUM = 165 UNITS
- SOFTSPEED ACTIVE FOR ROTATING
INTERVAL, NOVOS NOT ACTIVE
1200 - 0000 12.00
PRODt DRILL RIG P
DIRECTIONAL DRILL 6-118" PROD HOLE
BUILD SECTION IN THE IVISHAK
FORMATION FROM 9920' MD TO 10,180'
MD (6912' TVD)
- 260' IN 12 HRS = 21.7 FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP = 12-85 FPH
- 300 GPM, 1720-1760 PSI OFF BOTTOM,
1830-1870 PSI ON BOTTOM, ROT 40-60
RPM, 8-11 KFT-LBS TRQ, 14-25 KLBS
WOB
- MW IN/OUT = 8.6 PPG
- NO LOSSES TO FORMATION WHILE
DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS >
5.1100'
- NO BACKREAMING AT CONNECTIONS
- SLIGHTLY BEHIND ON INC AND HIGH
(-27) ON TVD OF DIRECTIONAL PLAN
WITH NO ISSUES, BUILD INCLINATION
FROM 73° TO 104°
-GAS WATCH: AVERAGE BACKGROUND
= 38-56 UNITS, MAXIMUM = 147 UNITS
- SOFTSPEED ACTIVE FOR ROTATING
INTERVALS, NOVOS ACTIVE FOR SHORT
PERIODS OF TIME
PUMPED 35 BBL HIGH VIS SWEEP AT
9960' MD: NO INCREASE IN CUTTINGS
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths'
North Amenca- ALASKA - BP
Operation Summary Report
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE (RON)
Start Date. 9/24/2017
1.00
Eno Date:
Project: Prudhoe Bay
Site: PB DS 14
06.30
- 11'.00
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11/1981 12:00:OOAM
DRILL
Rig Contractor: PARKER DRILLING CO.
Active datum: 14-16B Actual @88.71us8 (above Mean Sea Level)
Date From - To Him
Phase Task
Unit or
Code NPT
(hr)
Rotary
10/10/2017 0000 0530 5.50
PRODI DRILL
RIG
P
0530
- 0630
1.00
PROD1
DRILL
RIG P
06.30
- 11'.00
4.50
PROD1
DRILL
RIG P
11:00 - 12'.30 1.50 PROD? DRILL RIG P
Printed 11/6/2017 1 3227PM •AII depths reported in Drillers Depths'
Page 31 of 53
AFE No
X3-0189WC: (7,812,778.23 J
Rig Release: 10/24/2017
BPUOI. USA00000813
NPT Description of Operations
Depth _
DIRECTIONAL DRILL 6-1/8" PROD HOLE
BUILD SECTION IN THE IVISHAK
FORMATION FROM 10180' MD TO 10350'
MD (8844' TVD)
- 170' IN 5.5 HRS = 31 FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP= 15-90 FPH
- 300 GPM, 1720-1760 PSI OFF BOTTOM,
1830-1870 PSI ON BOTTOM, ROT 50-60
RPM, B-11 KFT-LBS TRO, 14-25 KLBS
WOB
- MW IN/OUT = 8.6 PPG
- NO LOSSES TO FORMATION WHILE
DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS >
5-/1001
- NO BACKREAMING AT CONNECTIONS
- STILL SLIGHTLY BEHIND ON INC AND
HIGH (^23') ON TVD OF DIRECTIONAL
PLAN WITH NO ISSUES, BUILD
INCLINATION FROM 104° TO 114°
-GAS WATCH: AVERAGE BACKGROUND
= 38-57 UNITS, MAXIMUM = 94 UNITS
- SOFTSPEED ACTIVE FOR ROTATING
INTERVALS, NOVOS NOT ACTIVE
CIRCULATE BOTTOMS UP PRIOR TO
TRIP FOR 6-1/8" RSS ASSEMBLY
- 300 GPM, 1750 PSI, 60 RPM, 9-11
KFT-LBS TORQUE
- RECIPROCATE 60' INTERVAL WHILE
CIRCULATING
- NO SIGNIFICANT CUTTINGS OVER
SHAKERS, HOLE IS CLEAN
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM, STATIC
PLANNED TRIP FOR RSS: TRIP OUT OF
HOLE WITH 6-1/8" MOTOR ASSEMBLY
FROM BUILD SECTION TD AT 10350' MD
TO BHAAT 143' MD ON ELEVATORS
- TRIPPING SPEED = 60 FPM IN OPEN
HOLE, 150-200 FPM IN CASED HOLE
- MONITOR WELL ON TRIP TANK
(PROPER DISPLACEMENT)
- MONITOR WELL FOR 10 MIN AT 7"
SHOE, STATIC
- MUD WEIGHT 8.6 PPG IN/OUT
_ - NO ISSUES TRIPPING OUT OF HOLE
- PLANNED TRIP FOR RSS: LAY DOWN
6-1/8" MOTOR ASSEMBLY FROM 143' MD
TO SURFACE
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING NON-SHEARABLES THROUGH
STACK, STATIC
-BIT GRADE: I - I - WT - A - E - IN - WT -
BHA
North America - ALASKA - BP
Operation Summary Report
Common Well Name. 14-16
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/24/2017 Eno Date
Project: Prudhoe Bay Site: PB DS 14
AFE No
K3 -0189M -C'. (7,812,778 23 )
Page 32 of 53
Rig Name/No.: PARKER 272
Spud Daterrime: 8/11/1981 12:00:OOAM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
DRILL
RIG
BPUOI: USA00000813
Active datum: 14-16B Actual @88.71usft (above Mean Sea Level)
1.50
PROD?
Date From - To His,
Phase Task
Unit or Code NPT
NPT Description of Operations
(hr)
PROD1
Rotary
Depth
1230 - 1630 4.00
PROD1 DRILL
RIG P
PLANNED TRIP FOR RSS: MAKE UP 6-1/8"
1630 - 2230 6.00 PROD1 DRILL RIG
22:30
- 00:00
1.50
PROD1
DRILL
RIG
10/11/2017 00:00
- 01:30
1.50
PROD?
DRILL
RIG
01:30
- 04:30
3.00
PROD1
DRILL
RIG
0430 - 0530 1.00 PROD1 DRILL RIG
05'.30 - 0700 1.50 PROD1 DRILL RIG
RSS ASSEMBLY FROM SURFACE TO 210'
MD
-NEW 6-1/8" SMITH X516 PDC BIT, RSS
WITH PORTED FLOAT, GR AT BIT,
GR/RES/NEU/DEN, STARTRAK IMAGE
LOG, MOCS CIRCULATION SUB 206'
FROM BIT
- RUN JARS 3738' BEHIND BIT PER SLB
MODELLING
- FULL STRING 4" HT -38 DRILL PIPE
- MONITOR WELL FOR 10 MIN PRIOR TO
_ RUNNING IN HOLE, STATIC
P PLANNED TRIP FOR RSS: TRIP IN HOLE
WITH 6-1/8" DRILLING ASSEMBLY FROM
BHAAT 210' MD TO 10129' MD ON
ELEVATORS
- FILL PIPE EVERY 2000' MD
- TRIPPING SPEED = 150 FPM IN CASED
HOLE, 70 FPM IN OPEN HOLE
- MONITOR WELL ON TRIP TANK
(PROPER DISPLACEMENT)
- MUD WEIGHT 8.6 PPG IN/OUT
- SHALLOW HOLE TEST MWD TOOLS AT
2500' MD (GOOD TEST)
- NO ISSUES TRIPPING IN HOLE
P WASH DOWN FULL STAND TO MAD PASS
DEPTH OF 10129' MD WHILE STAGING UP
PUMPS TO 300 GPM
P MAD PASS BUILD INTERVAL FROM 10129'
TO 10000' MD (BIT DEPTH) TO OBTAIN
NEU/DEN DATA
- PULLING SPEED =180 FPH
- 300 GPM, NO ROTATION, ORIENT
LOWSIDE (180° TFO)_
N WAIT 10,000.00 CONTINUE MAD PASS OF BUILD
INTERVAL FROM 10000' TO 9600' MD (BIT
DEPTH) TO OBTAIN NEU/DEN DATA
- TIME INTERVAL BROKEN OUT FOR NPT
- SEE PREVIOUS TIME ENTRY FOR
DETAILS
N DFAL 10,129.00 TROUBLESHOOT STARTRAK IMAGE
TOOL
- TROUBLESHOOT IN OPEN HOLE PER
BAKER DIRECTION DUE TO (STAR
TRACK) LIMITATIONS IN CASED HOLE.
- ROTATE AND CYCLE PUMPS
- COMMUNICATE WITH BAKER TECH
SUPPORT
- UNABLE TO ACTIVATE STARTRAK
DECISION MADE TO FINISH MAD PASS
AND THEN TRIP FOR STARTRAK TOOL.
P CONTINUE MAD PASS OF BUILD
INTERVAL FROM 9600' TO 9450' MD (BIT
DEPTH) TO OBTAIN NEU/DEN DATA
- SEE PREVIOUS TIME ENTRY FOR
DETAILS
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 14-16 APE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date'. 9/24/2017 End Dale: X3 -0189M -C: (7,812,778.23)
Project: Prudhoe Bay Site: PB DS 14
Rig Name/No.: PARKER 272 Spud Date rime: 6/11/1981 12:00:00AM Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO. BPUOI: USA00000813
Active datum: 14-168 Actual @88.71 usft (above Mean Sea Level)
Date From- To Him Phase Task Unit or
(hr) Rotary
0700 - 11:30 4.50 PROD1 DRILL RIG
11.30 - 20.00 8.50 PROD1 DRILL RIG
2000 - 0000 4.00 PRODi DRILL RIG
Page 33 of 53
Code NPT NPT
Description of Operations
Depth
_
N DFAL 10,129.00
UNPLANNED TRIP FOR LWD FAILURE:
TRIP OUT OF HOLE WITH 6-1/8" RSS
ASSEMBLY FROM 7" SHOE AT 9450' MD
TO BHAAT 209' MD ON ELEVATORS
- MONITOR WELL FOR 10 MIN AT 7"
SHOE, STATIC
- TRIPPING SPEED = 120-200 FPM IN
CASED HOLE
- MONITOR WELL ON TRIP TANK
(PROPER DISPLACEMENT)
- MUD WEIGHT 8.6 PPG IN/OUT
- NO ISSUES TRIPPING OUT OF HOLE
N DFAL 10,129.00
UNPLANNED TRIP FOR LWD FAILURE:
HANDLE 6-1/8" RSS BHA ON SURFACE
- PLUG INTO TOOLS ON FAILED
ASSEMBLYAND VERIFY
COMMUNICATION (GOOD)
- CLEAN AND CLEAR FLOOR
- MAKE UP TOOLS AND PLUG IN TO
INITIALIZE
- MAKE UP TOP DRIVE AND PUMP AT 325
GPM, 950 PSI WITH STARTRAK ABOVE
ROTARY TABLE (FUNCTIONING
PROPERLY)
- RE -RUN 6-1/8" SMITH X516 PDC BIT,
AUTOTRAK RSS AND MWD/LWD TOOLS
ALL CHANGED OUT, RE -RUN MODS
CIRCULATION SUB (208' BEHIND BIT)
AND JARS (3738' BEHIND BIT)
- FULL STRING 4" HT -38 DRILL PIPE
-TOTAL BHA: 209'
BP WSUP COMBUSTABLE GAS AT
SURFACE CONVERSATION WITH CREW:
TALKING POINTS GAS IN AIR, GAS IN
MUD, LEL'S & ALARM SETTINGS
N DFAL 10,129.00
UNPLANNED TRIP FOR LWD FAILURE:
TRIP IN HOLE WITH 6-1/8" DRILLING
ASSEMBLY FROM BHAAT 209' MD TO
9075' MD ON ELEVATORS
- FILL PIPE EVERY 2000' MD
- TRIPPING SPEED =120-200 FPM IN
CASED HOLE, 70 FPM IN OPEN HOLE
- MONITOR WELL ON TRIP TANK
(PROPER DISPLACEMENT)
- MUD WEIGHT 8.6 PPG IN/OUT
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/24/2017 End Date
Project Prudhoe Bay Site: BE PB DS 14
Rig Name/No.: PARKER 272 Spud Date/Time: 8/11/1981 12.00: o0AM
APE No
X3 -0189M -C.(7,812,778,23)
Page 34 of 53
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-168 Actual @88.71 usft (above Mean Sea Level)
Date From- To Him
Phase Task
Unit or Code NPT NPT Description of Operations
(hr)
Rotary Depth
10/12/2017 00:00 - 02:30 2.50
iikobi DRILL
RIG N DFAL 10,129.00 CONTINUE UNPLANNED TRIP FOR LWD
FAILURE: TRIP IN HOLE WITH 6-118"
DRILLING ASSEMBLY FROM 9075' MD TO
10350' MD (END OF BUILD SECTION) ON
ELEVATORS
- FILL PIPE EVERY 2000' MD
- TRIPPING SPEED = 120-200 FPM IN
CASED HOLE, 70 FPM IN OPEN HOLE
PER THE WELL PROGRAM
- MONITOR WELL VIA TRIP TANK, GOOD
DISPLACEMENT, MW IN/OUT = 8.6 PPG
- NO ISSUES TRIPPING IN OPEN HOLE
- WASH FINAL STAND DOWN AT 200 FPH
WITH 300 GPM, 1820 PSI, STAGING
PUMPS UP ALLOWING FOR PRESSURE
STABILIZATION. NO ISSUE GETTING
BACK TO BOTTOM.
SPR'S TAKEN
0230 - 0600 350
PROD1 DRILL
RIG P DIRECTIONAL DRILL 6-1/8" PRODUCTION
HOLE IN ZONE 4A FROM 10350' MD TO
10475' MD (125' IN 3.5 HRS = 35 'PH WITH
CONNECTIONS)
- INSTANTANEOUS ROP =30-80 FPH
- 300 GPM, 1770 PSI ON BOTTOM, 150
RPM, 8 / 10 KFT-LBS TRQ ON/OFF BTM,
2-8 KLBS WOB
- BREAK IN BIT AND DEVELOP CUTTINGS
PATTERN AT 60-80 RPM, 4-5 KLBS WOB
- MW IN/OUT = 8.6 PPG, SLIGHT
SEEPAGE LOSSES TO WELL DURING
ISI
DRILLING
- SURVEY EVERY 90' FOR DOGLEGS <
5°/100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE
DRILLING INTERVAL
- NOVOS OPERATING SYSTEM ENGAGED
ON BOTTOM: NOV REP ON SITE FOR
INSTRUCTION TO PARKER DRILLERS.
-GAS WATCH: AVERAGE BACKGROUND
= 40-75 UNITS, MAXIMUM = 148 UNITS
WHILE DRILLING
Printed 11/6/2017 1:32:27PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 14-16
Event Type. RE-ENTER- ONSHORE (RON)
Start Date: 9/24/2017
End Date:
Project: Prudhoe Bay
Site: P8 DS 14
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11/1981 12:00:00AM
Rig Contractor: PARKER DRILLING CO.
Active datum: 14-188 Actual @88.71usft (above Mean Sea Level)
Date From - To Him
Phase Task
Unit or Code NPT
(hr)
_Rotary
06:00 - 12:00 6.00
PROD1 DRILL
RIG P
Page 35 of 53
AFE No
X3 -0189M -C: (7,812,778.23 )
Rig Release: 10/242017
BPUOI: USA00000813
NPT Description of Operations
Depth
DIRECTIONAL DRILL 8-1/8" PRODUCTION
HOLE IN ZONE 4B FROM 10475' MD TO
10660' MD 8735' TVD (185' IN 6 HRS = 31
FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP=30-50 FPH IN
- 300 GPM, 1800 PSI ON BOTTOM, 140-160
RPM, 10 / 10.5 KFT-LBS TRO ON/OFF
BTM, 2-12 KLBS WOB
- MW IN/OUT = 8.7 PPG, SLIGHT
SEEPAGE LOSSES TO WELL DURING
DRILLING
- SURVEY EVERY 30' FOR DLS > 5°/100'
- NO BACKREAMING AT CONNECTIONS
- SOFTSPEED ACTIVE FOR ENTIRE
DRILLING INTERVAL
- NOVOS OPERATING SYSTEM ENGAGED
ON BOTTOM: NOV REP ON SITE FOR
INSTRUCTION TO PARKER DRILLERS
- GAS WATCH: AVERAGE BACKGROUND
= 3060 UNITS, MAXIMUM = 166 UNITS
WHILE DRILLING
-GEOSTEERING PER WELLSITE
GEOLOGIST
- SLOWED ROP TO 30-50 FPH AS
REQUIRED FOR DIRECTIONAL CONTROL
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths'
Common Well Name'. 14-16
Event Type: RE-ENTER- ONSHORE (RON)
Prudhoe
North America - ALASKA- BP
Operation Summary Report
Start Date: 9/24/2017 End Date
Site: PB DS 14
Active datum: 14-168 Actual @88.71 usft (above Mean Sea Level)
Date From - To Him Phase Task Unitor Code NPT NPT
(hr) Rotary Depth
12:00 - 00'00 1200.PROD? DRILL RIG P
Panted 11/6/2017 1.3227PM 'All depths reported in Drillers Depths'
Page 36 of 53
AFE No
X3 -0189M -C: (7,812,778.23)
Rig Release: 10/242017
BPUOI: USA00000813
Description of Operations
DIRECTIONAL DRILL 6-1/8" PRODUCTION
HOLE IN TSAD 8 SHUBLIK FROM 10660'
MD TO 10945' MD 8690' TVD (285' IN 11.5
HRS = 25 FPH WITH CONNECTIONS)
- INSTANTANEOUS ROP = 30-50 FPH
- 300 GPM, 1800 PSI ON BOTTOM, 140-160
RPM, 10 / 10.5 KFT-LBS TRQ ON/OFF
BTM, 2-12 KLBS WOB.
- MW IN/OUT = 8.7 PPG, SLIGHT
SEEPAGE LOSSES TO WELL DURING
DRILLING.
- SURVEY EVERY 30' FOR DLS > 5'/100'
- NO BACKREAMING AT CONNECTIONS.
- SOFTSPEED ACTIVE FOR ENTIRE
DRILLING INTERVAL.
- NOVOS OPERATING SYSTEM ENGAGED
ON BOTTOM: NOV REP ON SITE FOR
INSTRUCTION TO PARKER DRILLERS.
-GAS WATCH: AVERAGE BACKGROUND
= 30-55 UNITS, MAXIMUM = 75 UNITS
WHILE DRILLING.
- GEOSTEERING PER WELLSITE
GEOLOGIST.
- SLOWED ROP TO 30-50 FPH AS
REQUIRED FOR DIRECTIONAL
CONTROL.
- TROUBLE OBTAINING REQUIRED DROP
FOR REVERT POINT.
- ACTUAL DRILLING TIME FOR 24 HOUR
PERIOD = 15.4 HOURS.
- JAR HOURS = 35.4 HOURS
- DIRECTIONAUGEO NOTES FOR THE
DAY: ENTER SAG RIVER (TSHU
MARKER)AT 11800' MD, REVERT POINT
#1 AT 12110' MD IN SAG RIVER
- 24 HOUR FLUID LOSS: 67 BBLS
- UNABLE TO GET OILS REQUIRED FOR
REVERT POINT IN THE SAG RIVER:
- OBSERVED LOWER (RABBIT EAR)
GAMMA SIGNATURE AT 10877' MD
INDICATING THE TOP OF THE SAG RIVER
FORMATION. MADE NOTIFICATIONS TO
THE ODE AND TOWN GEOLOGISTS.
DECISION TO CONTINUE DRILLING
MAKING ALLATTEMPTS TO OBTAIN
REVERT POINT BACK IN TO THE SAG
FORMATION. OBSERVED UPPER
(RABBIT EAR) MARKER INDICATING TOP
OF THE SAG RIVER. OBSERVED BASE
OF KING AK SHALE ON NEAR BIT
GAMMA. DRILLED ADDITIONAL 5' FOR
CONFIRMATION. CIRCULATE FOR
SAMPLES
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE (RON)
North America - ALASKA - BP
Operation Summary Report
Start Date: 9/24/2017 End Date.
AFE No
X3 -0189M -C:(7,812,778.23)
Page 37 of 53
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud DateRme: 8/11/1981 12:00:OOAM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-168 Actual @88.7lusft (above Mean Sea Level)
Dale From - To We
Phase Task
Unit or Code
NPT NPT
Description of Operations
(hr)
Rotary
Depth
10/13/2017 00:00 - 02:00 2.00
PROD? DRILL
RIG N
DFAL 10,945.00
CIRCULATE 2.5 BOTTOMS UP TO
CONFIRM PRESENCE OF KINGAK SHALE
IN SAMPLES AND CONDITION HOLE
PRIOR TO TRIPPING FOR OPEN HOLE
SIDETRACK BHA
- 300 GPM, 1800 PSI, 60 RPM, 7 KFT-LBS
TORQUE
- RECIPROCATE 60' INTERVAL WHILE
CIRCULATING
- SAMPLES CONFIRM KINGAK SHALE
- PUMP HI -VIS SWEEP: 10% INCREASE IN
CUTTINGS OBSERVED AT SHAKERS
- TAKE SURVEY ON BOTTOM
-MW 8.7 PPG IN/OUT
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM, STATIC
02:00 - 07:00 5.00 PROD1
07:00 - 14:00 -- 7.00
PROD1
DRILL
DRILL
RIG N DFAL
RIG N DFAL
SLOW PUMP RATES (9? 10945' MD WITH
8.6 PPG QUIKDRIL-N:
MP#1: 30 SPM = 500 PSI, 40 SPM = 700
PSI
MP#2: 30 SPM = 500 PSI, 40 SPM = 690
_ PSI
10,945.00 UNPLANNED TRIP FOR OPEN HOLE
SIDETRACK:
PULL OUT OUT OF HOLE WITH 6-1/8" RSS
ASSEMBLY ON ELEVATORS FROM 10945'
TO BHAAT 209' MD ON ELEVATORS
- FINAL PICKUP / SLACKOFF WEIGHTS =
PU 190 KLBS, SO 140 KLBS, ROT 156
KLBS
-TRIPPING SPEED = 60-80 FPM IN OPEN
HOLE, 100-200 FPM IN CASED HOLE
- MONITOR WELL ON TRIP TANK
(PROPER DISPLACEMENT)
- MUD WEIGHT 8.7 PPG IN/OUT
-NO ISSUES TRIPPING OUT OF HOLE
- MONITOR WELL FOR 10 MIN AT 7"
SHOE, STATIC _
10,945.00 UNPLANNED TRIP FOR OPEN HOLE
SIDETRACK
LAY DOWN 6-1/8" RSS BHA#7 FROM 209'
MD
- MONITOR WELL 10 MIN PRIOR TO
PULLING BHATHROUGH THE BOP
MAKE UP NEW MOTOR BHA#8 PER
BAKER DO FROM SURF TO 226' MD
- NEW 8-1/8" HUGHES CHRISTENSEN
VGD-20DX TRI -CONE INSERT BIT,
MOTOR WITH 1.5° AKO,
GR/RES/NEU/DEN, STARTRAK IMAGE
LOG, MOCS CIRC SUB (225' BEHIND BIT)
- RUN JARS 3755' MD BEHIND BIT PER
SLB MODELING
- MONITOR WELL 10 MIN PRIOR TO RIH
WITH BHA- WELL STATIC
- FULL STRING 4" HT -38 DRILL PIPE
-TOTAL BHA: 226'
Printed 11/6/2017 1:32t27PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 38 of 53
Common Well Name: 14-16 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/24/2017 End Date X3 -018911i (7,812,778,23)
Project: Prudhoe Bay Site: PB DS 14
Active datum: 14-168 Actual @88.71 usft (above Mean Sea Level)
Date From - To Him Phase Task Unit or
(hr)_ _ Rotary
14:00 - 20:30 6.50 PROD, DRILL RIG
Rig Release: 10/24/201
BPUOI: USA00000813
Code NPT NPT
Description of Operabons
__Depth
_
N DFAL 10,945.00
UNPLANNED TRIP FOR OPEN HOLE
SIDETRACK:
RUN IN HOLE WITH 6-1/8" DRILLING
ASSEMBLY FROM BHAAT 226' MD TO
OPEN HOLE SIDETRACKTROUGHING
POINT OF 10184' MD ON ELEVATORS
- SHALLOW HOLE TEST TOOLS AT 2000'
MD (GOOD TEST)
- FILL PIPE EVERY 2000'MD
- TRIPPING SPEED = 120-200 FPM IN
CASED HOLE, 40-60 FPM IN OPEN HOLE
- MONITOR WELL ON TRIP TANK
(PROPER DISPLACEMENT)
- MUD WEIGHT 8.6 PPG IN/OUT
- NO ISSUES TRIPPING IN HOLE
AT 7" SHOE, FUNCTION ANNULAR
PREVENTER, UPPER AND LOWER RAMS,
AND HCRS FOR WEEKLY BOP FUNCTION
TEST. BLIND / SHEAR RAMS WILL BE
FUNCTIONED WHEN OUT OF HOLE.
SLOW PUMP RATES @ 9445' MD WITH
8.6 PPG QUIKDRIL-N:
li 30 SPM = 490 PSI, 40 SPM = 690
PSI
li 30 SPM = 500 PSI, 40 SPM = 680
PSI
20:30 - 23:00 2.50 PROD1 DRILL RIG N DFAL 10,945.00 OPEN HOLE SIDETRACK WITH 1.5°
MUD MOTORAND HCC INSERT BIT
-ORIENT DRILL STRING 160° L, TROUGH
FOR SIDETRACK FROM 10182' MO TO
10212' MD
- 300 GPM, 1990 PSI ON, 1920 PSI OFF.
8-10K , WOB AT 50 FPH
2300 - 0000 1.00 PROD1 DRILL RIG N DFAL 10,945.00 TIME DRILL FOR OPEN HOLE SIDETRACK
FROM 10212' TO 10213' MD AT MIDNIGHT
300 GPM, 1920 PSI ON, 1920 PSI OFF, 2 K
WOB. PUW-188K, SOW -140K
- TIME DRILL ACCORDING TO APPROVED
LEVEL 2 OCN A9
- MW 8.7 PPG IN / OUT -
SOFTSPEEDACTIVE FOR ENTIRE
DRILLING INTERVAL
- NOVOS OPERATING SYSTEM ENGAGED
ON BOTTOM: NOV REP ON SITE FOR
INSTRUCTION TO PARKER DRILLERS.
-GAS WATCH: AVERAGE BACKGROUND
= 41 UNITS, MAXIMUM = 41 UNITS WHILE
DRILLING
-ACTUAL DRILLING TIME FOR 24 HOUR
PERIOD=.6 HOURS.
- JAR HOURS = 36 HOURS
- 24 HOUR FLUID LOSS: 19 BBLS
Printed 11/6/2017 1:32:27PM •AII depths reported in Drillers Deplhs'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 9/24/2017
Eno Dale:
Project Prudhoe Bay
Site: PB DS 14
TIME DRILL FOR OPEN HOLE SIDETRACK
Rig Name/No.: PARKER 272
Spud DateTme: 8/11/1981 1200 00AM
Rig Contractor. PARKER DRILLING CO.
LEVEL 2 OCN #9
Active datum: 14-168 Actual @88.7lusft (above Mean Sea Level)
Date From - To Hrs
Phase Task
Unit or Code
_ (hr)
_
Rotary
10/14/2017 00:00 - 08:00 6.00
PROD1 DRILL
RIG N
06:00 - 12:00 6.00 PROD1 DRILL RIG N
Page 39 of 53
AFE No
X3 -0189M -C:(7,812,778.23)
Rig Release: 10/24/2017
NPT NPT
Description of Operations
Depth
DFAL 10,945.00
TIME DRILL FOR OPEN HOLE SIDETRACK
FROM 10212' MD TO 10236' MD PER
LEVEL 2 OCN #9
- 300 GPM, 1910 PSI OFF BOTTOM,
1950-1970 PSI ON BOTTOM, 1-7 KLBS
WOB
- FROM 10212' MD TO 10218' MD 0 2 FPH
- FROM 10218' MD TO 10222' MD @ 4 FPH,
OBSERVE DIFFERENTIAL PRESSURE
AND WOE (WELL IS SIDETRACKED)
- FROM 10222' MD TO 10236' MD @ 10-20
FPH
- MW 8.7 PPG IN / OUT
SURVEY CONFIRMATION INDICATES
ACTUAL KOP AT 10182' MD WHERE THE
TROUGHING BEGAN.
DFAL 10,945.00
DIRECTIONAL DRILL 6-1/8" PROD HOLE
BUILD SECTION IN IVISHAK ZONE 4
FORMATION FROM 10236' MD TO 10345'
MD
- 109' IN 6 HRS = 18 FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP = 20-75 FPH
- 300 GPM, 1930-1940 PSI OFF BOTTOM,
199U-2040 PSI ON BOTTOM, ROT 70 RPM,
5-7 KFT-LBS TRQ, 7-10 KLBS WOB
- MW 8.7 PPG IN/OUT
- NO LOSSES TO FORMATION WHILE
DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS >
5°/100'
- NO BACKREAMING AT CONNECTIONS
- DIRECTIONAL: 20' LOW TO TVD OF
DIRECTIONAL PLAN 89.6° BEHIND ON
INC. LOSING INCLINATION FROM THE
KICK OFF POINT TO 10345' MD
-GAS WATCH: INTERMITTENT READINGS
(QUADCO REP CALLED OUT TO
TROUBLESHOOT)
- SOFTSPEED ACTIVE FOR ROTATING
INTERVALS, NOVOS ACTIVE FOR PART
OF DRILLING TIME
Printed 11/6/2017 1:32:27PM 'Ail depths reported in Drillers Depths'
Common Well Name'. 14-16
Event Type: RE-ENTER- ONSHORE (RON)
North America - ALASKA - BP
Page 40 of 53
Operation Summary Report
AFE No
Start Date: 9/24/2017
End Date: X3 -0189M -C: (7,812,778,23)
Project: Prudhoe Bay Site: PB DS 14
Rig Name/No.: PARKER 272 Spud Date/Time: 8/11/1981 12:00.00AM Rig Release: 10/24/2017
Active datum: 14-168 Actual @88.71 us8 (above Mean Sea Level)
Date From - To Him Phase Task
(hr) _ _
12:00 - 18:00 6.00 PROD1 DRILL
BPUOI'. USA00000813
Unit or Code NET NPT Description of Operations
Rotary Depth
RIG N DEAL 10,11200 DIRECTIONAL DRILL 6-1 /8" PROD HOLE
BUILD SECTION IN IVISHAK ZONE 4
FORMATION FROM 10,345' MO TO 10,529'
MD
-184' IN 6 HRS = 31 FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP = 20-100 FPH
- 300 GPM, 1960-1980 PSI OFF BOTTOM,
2050-2120 PSI ON BOTTOM, ROT 70 RPM,
5-7 KFT-LBS TRQ, 7-20 NILES WOB
- MW 8.7 PPG IN/OUT
- NO LOSSES TO FORMATION WHILE
DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS >
5°/100'
- NO BACKREAMING AT CONNECTIONS
- GAS WATCH: AVERAGE BACKGROUND
= 50-75 UNITS, MAXIMUM = 146 UNITS
WHILE DRILLING
- SOFTSPEED ACTIVE FOR ROTATING
INTERVALS, NOVOS ACTIVE FOR PART
OF DRILLING TIME
- TROUBLE OBTAINING BUILD RATE.
-DIRECTIONAL' 58' LOW TO TVD OF
DIRECTIONAL PLAN, 12.5' LEFT 8 6°
BEHIND ON INC. SLIGHTLY BUILDING
ANGLE FROM 98.67* TO 101°
- BAKER DO CALCULATED AN
ESTIMATED 45° OFFSET IN TOOL FACE.
EXPLAINING WHY THE MOTOR WAS NOT
GIVING THE EXPECTED BUILD RATE.
Printed 11/6/2017 1 32 27P *All depths reported in Drillers Depths'
North America - ALASKA - Ble
Operation Summary Report
Common Well Name', 14-16
Event Type. RE-ENTER- ONSHORE (RON) Start Date. 9/24/2017
Project: Prudhoe Bay Site: PS DS 14
End Date
AFE No
X3 -0189M -C:(7,812,778.23)
Page 41 of 53
Rig Name/No.: PARKER 272 Spud Daterrime: 8/11/1981 12:00:OOAM
Rig Release: 10/24/2017
Rig Contractor. PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-188 Actual @88.71us8 (above Mean Sea Level)
Date From - To Hire Phase Task Unit or Code
NPT NPT Description of Operations
Rotary ary
_— -
Depth
18:00 - 00:00 6.00 PROD1 DRILL RIG N
DEAL 10,112.00 DIRECTIONAL DRILL 6-1/a" PROD HOLE
BUILD SECTION IN IVISHAK ZONE 4
FORMATION FROM 10,529' MD TO 10,706'
MD
- 177' IN 6 HRS = 29.5 FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP = 20-75 FPH
. - 300 GPM, 2000 PSI OFF BOTTOM, 2170
. PSI ON BOTTOM, ROT 70 RPM, 8 KFT-LBS
TRO ON, 6K TO OFF, 7-10 KLBS WOB
- MW 8.7 PPG IN/OUT
-SLIGHT SEEPAGE LOSSES TO
FORMATION WHILE DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS >
5x/100'
- NO BACKREAMING AT CONNECTIONS
- ACTUAL DRILLING TIME FOR 24 HOUR
PERIOD = 15.4 HOURS.
-JAR HOURS =51.6 HOURS
- 24 HOUR FLUID LOSS: 30 BBLS
-GAS WATCH: AVERAGE BACKGROUND
= 50-75 UNITS, MAXIMUM = 149 UNITS
WHILE DRILLING
- SOFTSPEED ACTIVE FOR ROTATING
INTERVALS, NOVOS ACTIVE FOR PART
OF DRILLING TIME
- PUMPED 35 BBL HIGH VIS SWEEP -
MINIMAL INCREASE OF CUTTINGS AT
BOTTOMS UP - 10%
-DIRECTIONAL: 54' LOW TO TVD OF
DIRECTIONAL PLAN, 40' LEFT & 7°
AHEAD ON INC. BUILDING ANGLE FROM
101° TO 113.57°
USING CORRECTED OFFSET FOR TOOL
FACE OF 45°-65° WAS ABLE TO OBTAIN
EXPECTED BUILD RATE AND DLS FROM
MUD MOTOR
10/15/2017 00:00 - 12'.00 1200.PROD1 DRILL RIG N
DEAL 10,112.00 DIRECTIONAL DRILL 6-1/8" PROD HOLE
BUILD SECTION IN IVISHAK ZONE 4 &
SHUBLIK FORMATIONS FROM 10706' MD
TO 10882' MD.
- 176' IN 12 HRS = 15 FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP = 30-40 FPH
- 300 GPM, 2055 PSI OFF BOTTOM, 2150
PSI ON BOTTOM, ROT 70 RPM, 7K TRO
OFF, SKTO ON, 7-10 KLBS WOB
- MW 8.7 PPG IN/OUT
- SLIGHT SEEPAGE LOSSES TO
FORMATION WHILE DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS >
5°/100'
- NO BACKREAMING AT CONNECTIONS
- BASE OF SHUBLIK IN AT -10800'M D
-GAS WATCH: AVERAGE BACKGROUND
= 40 UNITS, MAXIMUM = 58 UNITS WHILE
DRILLING
- SOFTSPEED ACTIVE FOR ROTATING
INTERVALS, NOVOS ACTIVE FOR PART
OF DRILLING TIME
- SPR'S AT 10708' MD , 8784' TVD
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths*
North Arnenra - ALASKA - BP
Operation Summary Report
Page 42 of 53
Common Well Name. 14-16 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/24/2017 Eno Date: X3 -0189M -C: (7,812 778 23 )
Project. Prudhoe Bay Site: PB DS 14
Rig Contractor: PARKER DRILLING CO.
Active datum: 14-168 Actual @88.71 usft (above Mean Sea Level)
Date From - To Him Phase Task
(hr)
12:00 - 18:00 8.00 PROD? DRILL
Unit or Code NPT NPT
Rotary Depth
RIG N DFAL 10,112.00
Printed 11/62017 1:32:27PM `All depths reported in Drillers Depths'
Rig Release: 1024/2017
BPUOI: USA00000813
Description of Operations
DIRECTIONAL DRILL 6-1/8" PROD HOLE
BUILD SECTION IN THE SHUBLIK
FORMATION FROM 10,882' MD TO 10947'
MD. 8703' TVD
- 65' IN 6 HRS = FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP =20-30 FPH
- 300 GPM, 2055 PSI OFF BOTTOM, 2150
PSI ON BOTTOM, ROT 70 RPM, 7K TRO
OFF, 8K TO ON, 10-20 KLBS WOB
- MW 8.7 PPG IN/OUT
- SLIGHT SEEPAGE LOSSES TO
FORMATION WHILE DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS >
5°/100'
- NO BACKREAMING AT CONNECTIONS
- DIRECTIONAL: NO ISSUES, 10' LOW &
56' LEFT OF PLAN
- MOTOR PERFORMING AS EXPECTED
YIELDING ABOUT 10.5°/100'
-GAS WATCH: AVERAGE BACKGROUND
=40 UNITS, MAXIMUM = 95 UNITS WHILE
DRILLING
- SOFTSPEED ACTIVE FOR ROTATING
INTERVALS, NOVOS ACTIVE FOR PART
OF DRILLING TIME
- 10945' MD OFF NPT FROM OH
SIDETRACK. B ACK ON PRODUCTIVE
TIME
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE (RON)
Pmject: Prudhoe
North America -ALASKA - BP Page 43 of 53
Operation Summary Report
Start Dale: 9/24/2017 End Date:
Site: PB DS 14
AFE No
—---X3-0189M-C: (7,812,778.23 )
Rig Release: 10/24/2017
Rig Contractor. PARKER DRILLING CO.
BPUOI. USA00000813
Active datum: 14-18B Actual 088.71 usft (above Mean Sea Level)
Date From - To Hrs Phase Task
Unitor
Code NPT NPT Description of Operations
(hr)
Rotary
Depth
18:00 - 00:00 6.00 PROD1 DRILL
RIG
P DFAL 10,112.00 DIRECTIONAL DRILL 6-1/8" PROD HOLE
BUILD SECTION IN SHUBLIK AND SAG
RIVER FORMATION FROM 10947' MD TO
11083' MD. 8609' TVD
- 119' IN 6 HRS = 20 FPH WITH
CONNECTIONS.
- INSTANTANEOUS ROP = 30-60 FPH
- 300 GPM, 1930-1940 PSI OFF BOTTOM,
1990-2040 PSI ON BOTTOM, ROT 70 RPM,
5-7 KFT-LBS TRO, 7-10 KLBS WOB
- MW 8.7 PPG IN/OUT, CONTINUOUS
CENTRIFUGE OPERATION AND RUNNING
10 BELS OF WATER ALL DAY.
- SLIGHT SEEPAGE LOSSES TO
FORMATION WHILE DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS >
5o/100'
- NO BACKREAMING AT CONNECTIONS
- ACTUAL DRILLING TIME FOR 24 HOUR
PERIOD = 16.3 HOURS.
-JAR HOURS =67.9 HOURS
-24 HOUR FLUID LOSS: 37 BBLS
-GAS WATCH: AVERAGE BACKGROUND
=40 UNITS, MAXIMUM = 95 UNITS WHILE
DRILLING
- SOFTSPEED ACTIVE FOR ROTATING
INTERVALS, NOVOS ACTIVE FOR PART
OF DRILLING TIME
- GEOLOGY: ENTERED THE BASE OF
THE SAG AT 10,982' MD. ROP INCREASED
FROM 3040 FPH INSTANTANEOUS TO
50-60 FPH.
- DIRECTIONAL: NO ISSUES, 0.80' LOW &
45' LEFT OF PLAN. LANDED 90° IN THE
SAG AT 11077' MD. TOWN GEOLOGY
INSTRUCTED DO TO BRING INC DOWN
TO 87° FOR POTENTIAL FAULT. WILL
GEO STEER FROM THERE. _
Printed 11/6/2017 1:32:27PM •AII depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 14-16 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/24/2017 End Date. X3 -0189M -C: (7,812,778.23)
Project: Prudhoe Bay i Site: PB DS 14
Page 44 of 53
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-168 Actual @88.71 usft (above Mean Sea Level)
Date From - To Him Phase Task
Unit or Code NPT NPT
Description of Operations
_ (hr) _ _ _
Rotary
Depth
_ -
10/16/2077 00:00 - 12:00 12.00 PRODi DRILL
RIG P DEAL
10,112.00
DIRECTIONAL DRILL 6-1/8" PROD HOLE
BUILD SECTION IN THE SAG RIVER
FORMATION FROM 11083' MD. TO 11,410'
MD
- 327' IN 12 HRS = 27 FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP = 50-60 FPH
SLIDING, 100 FPH IN ROTATION
- 300 GPM, 1930-1940 PSI OFF BOTTOM,
1990-2040 PSI ON BOTTOM, ROT 70 RPM,
5-7 KFT-LBS TRO, 7-10 KLBS WOB
- MW 8.7 PPG IN/OUT, CONTINUOUS
CENTRIFUGE OPERATION WHILE
RUNNING 10 BBLS OF WATER
- SLIGHT SEEPAGE LOSSES TO
FORMATION WHILE DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS >
5°/100'
- NO BACKREAMING AT CONNECTIONS
- DIRECTIONAL: GEO STEER TO PLAN
BRING INCLINATION TO 87° FOR
POSSIBLE FAULT. TURN BACK UP TO 96'
PER THE TOWN GEO
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 45 of 53
Common Well Name: 14-16
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 9/24/2017 End Date:
X3 -0189M -C'. (7,812,778.23)
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Daterrime: 8/11/1981 12:00,00AM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-16B Actual @88.71 usfi (above Mean Sea Level)
Date From - To Hrs
Phase Task Unit or Code NPT
NPT Description of Operations
(hr)
Rotary.
.. Depth
12:00 - 13:30 1.50
PROD1 DRILL RIG P DEAL
10,112.00 DIRECTIONAL DRILL &1/8" PROD HOLE
BUILD SECTION IN THE SAG RIVER
FORMATION FROM 11,410' MD TO 11431'
MD, 8,686' TVD- END OF SECTION WITH
MOTOR ASSEMBLY
- 327' IN 12 HRS = 27 FPH WITH
CONNECTIONS
- INSTANTANEOUS ROP = 50-60 FPH
SLIDING, 100 FPH IN ROTATION
- 300 GPM, 1930-1940 PSI OFF BOTTOM,
1990-2040 PSI ON BOTTOM, ROT 70 RPM,
5-7 KFT-LBS TRO, 7-10 KLBS WOB
- MW 8.7 PPG IN/OUT, CONTINUOUS
CENTRIFUGE OPERATION WHILE
RUNNING 10 BBLS OF WATER
- SLIGHT SEEPAGE LOSSES TO
FORMATION WHILE DRILLING AHEAD
- SURVEY EVERY 30' FOR DOGLEGS >
5°/100'
- NO BACKREAMING AT CONNECTIONS
- TAKE SPR'S AT 11,431' MD
- ACTUAL DRILLING TIME FOR 24 HOUR
PERIOD = 7.5 HOURS.
- JAR HOURS = 75 HOURS
- 24 HOUR FLUID LOSS: 53 BBLS
-GAS WATCH: AVERAGE BACKGROUND
= 40 UNITS, MAXIMUM = 294 UNITS
WHILE DRILLING
- SOFTSPEED ACTIVE FOR ROTATING
INTERVALS, NOVOS ACTIVE FOR PART
OF DRILLING TIME
- GEOLOGY: DRILLING SAG FORMATION,
DIPPED INTO THE SHUBLIK BEFORE
BRINGING INC UP TO 96°
- DIRECTIONAL: HAVING ISSUES
SLIDING IN THE SAG FORMATION
DIFFICULTLY GETTING BUILD FOR GEO
STEER REQUEST.
- DISCUSSION WITH ANCHORAGE
LEADERSHIP: DECISION MADE TO PULL
MOTOR BHAAND MU RSS BHA.
- 10 MIN FLOW CHECK OFF BOTTOM -
STATIC
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths'
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE(RON)
Project: Prudhoe Bay
Rig Name/No.: PARKER 272
North America - ALASKA - BP Page 46 of 53
Operation Summary Report
Start Date: 9/24/2017 End Date:
Site: PB DS 14
Rig Contractor: PARKER DRILLING CO.
Active datum: 14-16BActual @88.71usft (above Mean Sea Level)
Date From - To
Hire
Phase
Task
Unit or
UNPLANNED TRIP OUT OF THE HOLE'.
(hr) _
_
Rotary
13:30 - 20:00
6.50
PROD?
DRILL
RIG
2000 - 2330
3.50
PROD1
DRILL
RIG
23:30 - 00:00
0.50
PROD?
DRILL
RIG
AFE No
X3 -0189M -O. (7,812,778,23)
BPUOI: USA00000813
Code NPT NPT
Description of Operations
Depth
N DPRB 11,431.00
UNPLANNED TRIP OUT OF THE HOLE'.
POOH TO PICK UP RSS BHA
- POOH ON ELEVATORS FROM 11,431'
MD TO BHA AT 209'
-PU-189K, SOW -136K, ROT -154K
- 10 MIN FLOW CHECK PRIOR TO
PULLING INTOTHE SHOE- WELLSTATIC
- MONITOR WELL ON TRIP TANK- SLIGHT
LOSS TO WELL -9 BBLS FOR ENTIRE
TRIP.
-MW 8.7 PPG IN/OUT
- TIGHT SPOT AT 10,710' MD, PULLED 30K
OVER, KELLY UP AND ROTATE PIPE 180°
AND PULLED THROUGH WITH OUT
ISSUE.
- WORKED OH SIDETRACK JUNCTION AT
-10,200'- ORIENT MOTOR HIGH SIDE
WORK PAST INTERSECTION TWO TIMES
WITH 300 GPM, 1970 PSI
RIH WITH PUMPS OFF AND MOTOR
ORIENTATED HIGH SIDE, UNABLE TO
SLIDE IN PB7 HOLE.
N DPRB 11,431.00
LAY DOWN MOTOR BHA#8. FROM 200'
TO SURFACE
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING NON-SHEARABLES THROUGH
STACK, STATIC
-LD CIRC SUB, JOINT OF 4" DP. REMOVE
SOURCE FROM SDN, LD FLOAT, FILTER
SUB AND 2 NON MAG COLLARS
- PLUG IN AND DOWN LOAD DATA FROM
MWD.
- LD PONY COLLAR AND STRING STAB.
DD VERIFY SCRIBE ON MUD MOTOR AT
SURFACE: VERIFIED A72* ERROR FROM
ORIGINAL MEASUREMENT. 60° DEG
OFFSET CORRECTION APPLIED WHILE
DRILLING.
- VERIFIED BREAK OUT TO FOR THE
MWD AND MOTOR BY USING THE RIG
TONGS FOR GREATER ACCURACY.
EACH BREAK WAS 10K MATCHING OPT
MAKE UP TO FOR 3-1/2" IF.
- BREAK BIT, BREAKAND LD MOTOR
-BIT GRADE: 3 - 7 - BT - G - E - 1/8 - LT -
BHA, 1/8" UNDER GAUGE
N DPRB 11 431.00
MOBILIZE PISS BHA #9 FOR ASSEMBLY
- PICKUP STEERING HEAD
Printed 1116/2017 1:32:27PM *All depths reported in Drillers Depths*
North America - ALASKA- BP
Operation Summary Report
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 9/24/2017 End Date.
Protect: Prudhoe Bay Site: PB DS 14
Active datum: 14-16B Actual 088.71 usft (above Mean Sea Level)
Date From- To Hrs Phase Task Unit or Code
(hr) _ Rotary. .__.
10/17/2017 00:00 - 02:00 2.00 PROD1 DRILL RIG N
02:00 - 05:00 3.00 PRODi DRILL RIG N
05.00 - 06:00 1.00 PROD1 DRILL RIG N
Page 47 of 53
AFE No
X3 -0189M -C:(7,812,778,23)
Rig Release: 10/24/2017
BPUOI: USA00000813
NPT NPT
Description of Operations
Depth
DPRB 11,431.00
UNPLANNED TRIP FOR RSS:
MAKE UP 6-1/8" RSS ASSEMBLY FROM
SURFACE TO 210' MD
- NEW 6-1/8" HUGHES T406FSX PDC BIT,
RSS WITH PORTED FLOAT, GR AT BIT,
GR/RES/NEU/DEN, STARTRAK IMAGE
LOG, MOCS CIRCULATION SUB 208'
FROM BIT
- RUN JARS 3737' BEHIND BIT PER SLB
MODELING
- OAL LENGTH OF BHA: 209'
- FULL STRING 4" HT -38 DRILL PIPE
- MONITOR WELL FOR 10 MIN PRIOR TO
RUNNING IN HOLE, STATIC _
DPRB 11,431.00
UNPLANNED TRIP FOR RSS BHA:
TRIP IN HOLE WITH 6-1/8" DRILLING
ASSEMBLY FROM BHAAT 209' MD TO
2087' MD ON ELEVATORS
- TRIPPING SPEED = 150 FPM IN CASED
HOLE
- MONITOR WELL ON TRIP TANK
(PROPER DISPLACEMENT)
- FILL PIPE EVERY 2000' MD
- MUD WEIGHT 8.6 PPG IN/OUT
- SHALLOW HOLE TEST MWD TOOLS AT
2087' MD -TROUBLE SHOOTING MWD. 2
OF 3 RIBS ARE NOT COMMUNICATING.
TROUBLE SHOOT BY CHANGING MODE
FROM "STEER" TO "HOLD" AND
RE -TESTING, CYCLE PUMPS OFF FOR
HARD RESET. ATTEMPTTO ROTATE AT
30 RPM. MWD CONSULTING WITH
BAKER TECH SUPPORT FOR
ADDITIONAL TROUBLE SHOOTING
INSTRUCTIONS.
DFAL 2,100.00
UNPLANNED TRIP OUT OF THE HOLE
FOR FAILED RSS / MWD.
PULL OUT OF HOLE WITH 6-1/8" RSS
ASSEMBLY #9ON ELEVATORS FROM
2087' TO BHAAT 209' MO ON ELEVATORS
- FINAL PICKUP / SLACK OFF WEIGHTS =
PU 70 KLBS, SO 68 KLBS.
- 100-200 FPM IN CASED HOLE, PER THE
WELL PROGRAM.
-MONITOR WELL ON TRIP TANK
(PROPER DISPLACEMENT)
-MUD WEIGHT 8.7 PPG IN/OUT
- NO ISSUES TRIPPING OUT OF HOLE
- 10 MIN FLOW CHECK PRIOR TO
PULLING OUT OF THE HOLE - WELL
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 48 of 53
Common Well Name: 14-16
- 16'.30
1.00
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 9/24/2017 End Date.
16:30
X3 -0189M -C: (7,812,778,23)
Project: Prudhoe Bay
Site: PB DS 14
DRILL
RIG N
Rig Name/No.: PARKER 272
Spud Date/rime. 8/11/1981 12:00:OOAM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
(20' ABOVE 7" SHOE) ON ELEVATORS
BPUOI: USA00000813
Active datum: 14-168 Actual @88.71 daft (above Mean Sea Level)
- TRIPPING SPEED = 120-200 FPM IN
Date From - To Him
Phase Task Unit or Code NPT
NPT
Description of Operations
(hr)
Rotary
Depth
06:00 - 10:30 4.50
_—PRO&I DRILL RIG N DEAL
2,100.00
UNPLANNED TRIP OUT OF THE HOLE
- UNANNOUNCED (D7) DRILL WITH AAR
DPRB 11,431.00
SLIP AND CUT DRILLING LINE
FOR FAILED RSS / MWD.
-SLIP AND CUT 48' OF DRILLING LINE
-MONITOR WELL ON TRIP TANK DURING
LAY DOWN BHA # 9 PER DO DIRECTION
OPERATION
DPRB 11,431.00
UNPLANNED TRIP FOR OPEN HOLE
- FLOW CHECK WELL 10 MIN PRIOR TO
SIDETRACK FAILED RSS/MWD.
RUN IN HOLE WITH 6-1/8" DRILLING
PULLING BHA THROUGH THE STACK
ASSEMBLY FROM BHA FROM 9,030" MD
TO 11,431' MD ON ELEVATORS.
- UNLOAD NUCLEAR SOURCE, PER
- WASH DOWN FROM 11,316' MD TO
11,351' TAG UP ON LEDGE, SET DOWN
BAKER PROCEDURE
20K, ATTEMPT TO RUN PAST WITH NO
SUCCESS.
- BREAK BITAND LAY DOWN FAULTY
- REAM DOWN FROM 11,351' MD TO
11,431' WITH NO ISSUES
STEERING HEAD
- 300 GPM, 1960 PSI, 6"0 RPM, 6-7 K
TO
MAKE UP BHA# 10 WITH NEW STEERING
HEAD ALL OTHER COMPONENTS
REMAIN THE SAME AS BHA # 9
- PROGRAM TOOLS,
NEW 6-1/8" HUGHES T406FSX PDC BIT,
RSS WITH PORTED FLOAT, GR AT BIT,
GR/RES/NEU/DEN, STARTRAK IMAGE
LOG, MOCS CIRCULATION SUB 208'
FROM BIT
- RUN JARS 3737' BEHIND BIT PER SLB
MODELING
- DAL LENGTH OF BHA: 209'
-SURFACE TEST BHA -GOOD TEST
- FULL STRING 4" HT -38 DRILL PIPE
- MONITOR WELL FOR 10 MIN PRIOR TO
RUNNING IN HOLE, STATIC
10:30 - 15:30 5.00 PROD1 DRILL
RIG N
15'.30
- 16'.30
1.00
PROD?
DRILL
RIG P
16:30
- 18:00
1.50
PROD1
DRILL
RIG N
TO BOTTOM.
Printed 11/6/2017 1:32:27PM 'All depths reported in Drillers Depths'
RIH ON ELEVATORS FROM BHAAT 209'
TO 2100' MD
- SHALLOW HOLE TEST RSS / MWD -
GOOD TEST _
DPRB 11,43100
UNPLANNED TRIP FOR OPEN HOLE
SIDETRACK: FAILED RSS/MWD.
RUN IN HOLE WITH 6-1/8" DRILLING
ASSEMBLY FROM 2100' MD TO 9,030" MD
(20' ABOVE 7" SHOE) ON ELEVATORS
- FILL PIPE EVERY 2000' MD
- TRIPPING SPEED = 120-200 FPM IN
CASED HOLE, 40-60 FPM IN OPEN HOLE
- MONITOR WELL ON TRIP TANK
(PROPER DISPLACEMENT)
-MUD WEIGHT 8.6 PPG IN/OUT
- NO ISSUES TRIPPING IN HOLE
- SPR'S AT 9,027' MD
- UNANNOUNCED (D7) DRILL WITH AAR
DPRB 11,431.00
SLIP AND CUT DRILLING LINE
-SLIP AND CUT 48' OF DRILLING LINE
-MONITOR WELL ON TRIP TANK DURING
OPERATION
DPRB 11,431.00
UNPLANNED TRIP FOR OPEN HOLE
SIDETRACK FAILED RSS/MWD.
RUN IN HOLE WITH 6-1/8" DRILLING
ASSEMBLY FROM BHA FROM 9,030" MD
TO 11,431' MD ON ELEVATORS.
- WASH DOWN FROM 11,316' MD TO
11,351' TAG UP ON LEDGE, SET DOWN
20K, ATTEMPT TO RUN PAST WITH NO
SUCCESS.
- REAM DOWN FROM 11,351' MD TO
11,431' WITH NO ISSUES
- 300 GPM, 1960 PSI, 6"0 RPM, 6-7 K
TO
TO BOTTOM.
Printed 11/6/2017 1:32:27PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 49 of 53
Common Well Name'. 14-16
AFE No
Event Type. RE-ENTER- ONSHORE (RON)
Start Date: 9/24/2017 End Date'.
X3 -0189M -C: (7,812 778,23 )
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Date/Time'. 8/11/1981 12:00:00AM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USAOOOOOB13
Active datum: 14-168 Actual @88.71 usft (above Mean Sea Level)
Date From To Hm
Phase Task Unit or Code NPT
NPT Description of Operations
(hr)
Rotary
Depth
1800 - 0000 6.00
PRODt DRILL RIG P DFAL
10,945.00 DIRECTIONAL DRILL 6-1/8" PRODUCTION
HOLE IN SAG FROM 11,431' MD TO 11535'
MD 86881 TVD (1041 IN 6..5 HRS =16 FPH
WITH CONNECTIONS)
- INSTANTANEOUS ROP = 50-75 FPH
- 300 GPM, 1935 PSI ON BOTTOM, 140-160
RPM, 10 / 6 KFT-LBS TRQ ON/OFF BTM,
2-12 KLBS WOB.
- MW IN/OUT = 8.7 PPG, SLIGHT
SEEPAGE LOSSES TO WELL DURING
DRILLING.
- SURVEY EVERY 30' FOR DLS> 5'/100'
- NO BACKREAMING AT CONNECTIONS.
- SOFTSPEED ACTIVE FOR ENTIRE
DRILLING INTERVAL.
- NOVOS OPERATING SYSTEM ENGAGED
ON BOTTOM: NOV REP ON SITE FOR
INSTRUCTION TO PARKER DRILLERS.
- GAS WATCH: AVERAGE BACKGROUND
= 30-60 UNITS, MAXIMUM = 150 UNITS
WHILE DRILLING.
- GEOSTEERING PER WELLSITE
GEOLOGIST.
- ACTUALDRILLING TIME FOR 24 HOUR
PERIOD =3.2 HOURS.
-JAR HOURS =78.6 HOURS
- DIRECTIONAL/GEO NOTES FOR THE
DAY: OBSERVED LOWER RABBIT EAR
TRANSITION ZONE MARKER AT 11,445'.
ONSITE GEO INSTRUCTED DD TO STEER
DOWN AT 87°
- SLOWED ROP TO 30.50 FPH AS
REQUIRED FOR DIRECTIONAL
CONTROL.
-AT-11,500ON SITE GEO INSTRUCTED
DD TO DROP INCLINATION TO 86° TO
HELP GET BACK IN THE PRODUCTIVE
ZONE OF THE SAG.
Printed 11/8/2017 1:32:27PM *All depths reported in Drillers Depths'
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE(RON)
Project: Prudhoe Bay
Rig Name/No.: PARKER 272
North America - ALASKA - BP
Operation Summary Report
Start Dale: 9/24/2017 Ertl Date
Site: PB DS 14
Spud Dale/Time: 8/11/1981 12:00.00AM
Active datum: 14-168 Actual @88.71 usft (above Mean Sea Level)
Date From - To Ars Phase Task
(hr)
10/18/2017 00:00 - 1200 12.00 PROD1 DRILL
Unit or
Rotary
RIG
1200 - 22:30 10.50 PRODt DRILL RIG
Page 50 of 53
AFE No
K3 -0189M -C: (7,812,778.23 )
Rig Release: 10/24/2017
Code NPT NPT
Description of Operations
Depth
P DEAL 10,945.00
DIRECTIONAL DRILL 6-1/8" PRODUCTION
HOLE IN SAG FROM 11,535' MD TO
12,010'MD (475'IN6HRS=79FPH
WITH CONNECTIONS)
- INSTANTANEOUS ROP = 75-150 FPH
- 300 GPM, 1935 PSI ON, 1920 PSI OFF,
140-160 RPM, 10 / 6 KFT-LBS TRQ
ON/OFF BTM, 12-17 KLBS WOB.
- MW IN/OUT = 8.7 PPG, SLIGHT
SEEPAGE LOSSES TO WELL DURING
DRILLING. <6 BPH
- SURVEY EVERY 30' FOR OLS > 5°/100'
- NO BACKREAMING AT CONNECTIONS.
- SOFTSPEED ACTIVE FOR ENTIRE
DRILLING INTERVAL.
- NOVOS OPERATING SYSTEM ENGAGED
ON BOTTOM: NOV REP ON SITE FOR
INSTRUCTION TO PARKER DRILLERS.
-GAS WATCH: AVERAGE BACKGROUND
= 100-150 UNITS, MAXIMUM = 240 UNITS
WHILE DRILLING.
- GEOSTEERING PER WELLSITE
GEOLOGIST WITH NO ISSUES.
- TAKE SPR'S
- 35 BBL HIGH VIS SWEEP PUMPED AT
12,010' MD, NO INCREASE IN CUTTINGS
AT BOTTOMS UP.
P DEAL 10,945.00
DIRECTIONAL DRILL 6-1/8" PRODUCTION
HOLE IN SAG FROM 12,010' MD TO
12,750' MD, 8,689' TVD (TD)
(740' IN 10.5 HRS = 70.5 FPH WITH
CONNECTIONS)
- INSTANTANEOUS ROP =75-150 FPH
- 300 GPM, 1935 PSI ON, 1920 PSI OFF,
140-160 RPM, 10 / 6 KFT-LBS TRO
ON/OFF BTM, 12-17 KLBS WOB.
- MW IN/OUT=8.7 PPG, SLIGHT
SEEPAGE LOSSES TO WELL DURING
DRILLING. <6BPH
-SURVEY EVERY 30' FOR DLS> 5°/100'
-NO BACKREAMINGAT CONNECTIONS.
- SOFTSPEED ACTIVE FOR ENTIRE
DRILLING INTERVAL.
- NOVOS OPERATING SYSTEM ENGAGED
ON BOTTOM: NOV REP ON SITE FOR
INSTRUCTION TO PARKER DRILLERS.
- GAS WATCH: AVERAGE BACKGROUND
= 150-230 UNITS, MAXIMUM = 425 UNITS
WHILE DRILLING.
- GEOSTEERING PER WELLSITE
GEOLOGIST WITH NO ISSUES.
- ACTUAL DRILLING TIME FOR 24 HOUR
PERIOD = 3.2 HOURS.
-JAR HOURS =93.4 HOURS
- DIRECTIONAUGEO NOTES FOR THE
DAY: DRILLED LATERALLY IN THE SAG
FORMATION ALL DAY WITH NO ISSUES.
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths"
North America - ALASKA- BP Page 51 of 53
Operation Summary Report
Common Well Name: 14-16
Event Type: RE-ENTER- ONSHORE (RON)
Project Prudhoe Bay
Start Date: 9/24/2017
Site: PB DS 14
AFE No
End Date. X3 -0189M -C: (7,812,778.23)
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-18B Actual @88.71
usft (above Mean Sea Levet
Date From - To
Him
Phase
Task Unit or Code NPT NPT
Description of Operations
(hr)
Rotary Depth
22:30 - 00:00
1.50
PROD1
DRILL RIG P DFAL 10,945.00
CIRCULATE HOLE CLEAN
- TOTAL OF 3 BOTTOMS UP
-PUMP HIGH VIS SWEEP -NO INCREASE
IN CUTTINGS RETURNS
-300 GPM AT 2100 PSI -120 RPMS AT 9K
FT -LBS TORQUE
-RECIPROCATE 70' AND ROTATE DURING
CIRCULATING TIME
-MW 8.7 PPG IN/OUT
- FLOWCHECK WELL FOR 10 MINUTES,
WELL LOSSING SLIGHTLY DROPPED 3-4
INCHES IN THE BELL NIPPLE OVER 10
MIN
10/19/2017 00:00 - 01:00
1.00
PROD1
DRILL RIG P DFAL 10,945.00
CIRCULATE HOLE CLEAN
- TOTAL OF 3 BOTTOMS UP
-PUMP HIGH VIS SWEEP- NO INCREASE
IN CUTTINGS RETURNS
-300 GPM AT 2100 PSI -120 RPM'S AT 9K
FT -LBS TORQUE
-RECIPROCATE 70' AND ROTATE DURING
CIRCULATING TIME
- MW 8.7 PPG IN / OUT
- FLOWCHECK WELL FOR 10 MINUTES,
WELL LOSING SLIGHTLY DROPPED 3-4
INCHES IN THE BELL NIPPLE OVER 10
MIN
01'.00 - 03:00
2.00
PROD1
DRILL RIG P DFAL 10,945.00
PLANNED WIPER TRIP
- TRIP OUT OF THE HOLE WITH 6-1/8"
RSS DRILLING ASSEMBLY ON
ELEVATORS FROM 12,750' MO MTO
11,250' MD
- PU 190 KLBS, SO 134 KLBS PULLING
OFFBOTTOM
- MONITOR WELL VIA TRIP TANK GOOD
DISPLACEMENT (MUD LOSSESAT 3-4
BPH)
- NO ISSUES TRIPPING THROUGH OPEN
HOLE FROM To TO START OF MAD PASS
03:00 - 05:00
2.00
PROD1
EVAL RIG N DFAL 10,945.00
MAD PASS LOG FROM -11,320' MDTO
11,040' MD BIT DEPTHS
-RES IMAGE SENSOR-91'BACK
- MAO PASS LOG PER BP GEOLOGY
- 300 GPM / 1830 PSI
- 150 FPH 1120-150 RPM, 6K TO
05:00 - 05:30
0.50
PROD1
DRILL RIG P DFAL 10,945.00
PLANNED WIPER TRIP:
- CONTINUE TO PULL OUT OF THE HOLE
WITH 6-1/8" RSS DRILLING ASSEMBLY
ON ELEVATORS FROM 11,040' MD TO
-10,650' MD (PER LEVEL 1 ODN # 11)
- PU = 185 KLBS, SO = 140 KLBS AT 10650'
MD
- MONITOR WELL VIA TRIP TANK, GOOD
DISPLACEMENT
Printed 11/6/2017 1:32:27PM *All depths reported in Drillers Depths*
North America - ALASKA - Ble
Operation Summary Report
Common Well Name. 14-16
Event Type: RE-ENTER- ONSHORE (RON) Start Date. 9/2412017 End Date
Project: Prudhoe Bay Site: PB DS 14
AFE No
X3 -0189M -C'. (7,812 778 23 )
Page 52 of 53
Rig Name/No.: PARKER 272
Spud Date/Time: 6/11/1981 12:00:OOAM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USAD0000813
Active datum: 14-168 Actual @88.71
usft (above Mean Sea Level)
Date From - To
Him
Phase Task
Unit or
Code NPT NPT
Description of Operations
(hr)
_
Rotary
Depth
05:30 - 07:00
1.50
PROD1 DRILL
RIG
P DEAL 10,945.00
RUN IN HOLE ON ELEVATORS WITH
6-1/8" RSS DRILLING ASSEMBLY FROM
I
10650' MD TO 12700' MD
- RIH AT 75 FT/MIN PER TRIPPING
SPEEDS OUTLINED IN WELL PROGRAM
- FILL PIPE EVERY 2000'
- PU = 190 KLBS, SO = 135 KLBS AT 12750'
MD
- MONITOR DISPLACEMENT VIATRIP
TANK: GOOD DISPLACEMENT
07:00 - 09:30
2.50
PROD1 DRILL
RIG
P DFAL 10,945.00
CIRCULATE HOLE CLEAN AT TD, 12750'
MD
!
- 300 GPM, 2100 PSI ICP, 1785 PSI FCP
- 120 RPM, 7 KLBS TORQUE
- PUMP HIGH VIS SWEEP SURFACE TO
SURFACE
- PERFORM MUD DILUTION PER BAROID
- OBTAIN SLOW PUMP RATES
- PERFORM FLOW CHECK PRIOR TO
PULLING OFF BOTTOM: STATIC
- MUD WEIGHT IN/OUT = 8.7 PPG
0930 - 11'.30
2.00
PROD1 DRILL
RIG
P DEAL 10,945.00
PULL OUT OF THE HOLE ON ELEVATORS
FROM 12750' MD TO INTERMEDIATE
SHOEAT9470'MD
- PU = 185 KLBS, SO = 140 KLBS AT 12750'
MD
- MONITOR HOLE FILL WITH TRIP TANK:
GOOD HOLE FILL
- PULL OUT OF HOLE AT 50 - 75 FT/MIN
PER SPEEDS IN WELL PROGRAM
11:30 - 12:00
0.50
PROD1 DRILL
RIG
P DEAL 10,945.00
CIRCULATE HOLE CLEAN AT 9470'MD
- 300 GPM, 1550 PSI
- 80 RPM, 3 KLBS TORQUE
- MW 8.7 PPG IN / OUT
- NO INCREASE IN CUTTINGS AT
BOTTOMS UP_
1200'. - 17:30
5.50
PROD? DRILL
RIG
P DEAL 10,945.00
PULL OUT OF THE HOLE ON ELEVATORS
FROM 9676' MD TO 210' MD
- MONITOR WELL FOR 10 MINUTES
BEFORE PULLING NON-SHEARABLES
THROUGH THE STACK: STATIC
- PU = 180 KLBS, SO = 140 KLBS AT 9400'
MD
- MUD WEIGHT IN/OUT = 8.7 PPG
-1-2 BPH LOSS RATE WHILE PULLING
OUT OF THE HOLE
15:00- (D1) WELL CONTROL DRILL WITH,
COMPLICATED WITH RIG BLACK OUT
Printed 11/6/2017 1:32:27PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 14-16
Rig Release: 10/242017
Event Type: RE-ENTER- ONSHORE (RON)
Start Date. 9/24/2017
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud DateRme: 8/11
Rig Contractor: PARKER DRILLING CO.
Depth
Active datum: 14-16B Actual @88.71usft (above Mean Sea Level)
Date From - To Him
Phase Task
(hr)
17:30 - 19:00 1.50
PROD1 DRILL
APE No
End Date X3 -0189M -C: (7,812,778.23)
Page 53 of 53
1981 12:00.00AM
Rig Release: 10/242017
BPUOI: USA00000813
Unitor Code
NPT NET Description of Operations
Rotary
Depth
RIG P
IDEAL 10,945.00 LAY DOWN BHA PER BAKER DD/MWD
- MONITOR WELL FOR 10 MIN, 1-2 BPH
STATIC LOSS RATE
- LD CIRC SUB, 4" JOINT OF DP, FLOAT
SUB AND FILTER SUB
- REMOVE RADIOACTIVE SOURCE FROM
SDN
. - LAY DOWN 2 NM DRILL COLLARS,
ONTRAK AND SDN
- BREAK OFF BIT, GRADE
1 -1 -BT -G -X -1 -CT -TD
-LAY DOWN ONTRAK AND AUTOTRAK
RSS
- DOWNLOAD MEMORY DATA FROM MWD
TOOLS IN PIPE SHED
END OF DS14-16B RON EVENT- SWITCH
TO 0514-16 CON EVENT.
- CLEAN AND CLEAR RIG FLOOR AND
PREPARE FOR 4-1/2" LINER RUN
Printed 11/612017 1:32:27PM 'All depths reported in Drillers Depths`
North America - ALASKA - BP
Operation Summary Report
Page 1 of 11
Common Well Name: 1416
P
12,750.00
RUNPRD
AFE No
Event Type: COM- ONSHORE (CON)
12,750.00
Start Dale: 10/19/2017
End Date: 10/24/2017
X3 -0189M -C: (2,012,222.00)
Project: Prudhoe Bay
RUNPRD
Site: PB DS 14
P
12,750.00
Rig Name/NO.: PARKER 272
Spud DateTme: 8/11/1981 12:00:00AM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USAOOOOOB13
Active datum: 14-16B Actual @88.71 usft
(above Mean Sea Level)
Date From - To
Him
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
_
(usft)
10/19/2017 19:00 - 19:30
0.50
CASING P
12,750.00 RUNPRD
PERFORM WEEKLY BOPE FUNCTION TEST
- FUNCTION TEST PER API 53
- FUNCTION ALL PREVENTERS, HCR VALVES.
1930 - 21:00
1.50
CASING P
12,750.00 RUNPRD
RIG UP TO RUN 4-1/2" 12.6 #, 13CR VT LINER
- RIG UP TONGS AND TORQUE TURN
EQUIPMENT
- VERIFY LINER, SHOE TRACKAND LINER
HANGER/PACKER IN PIPE SHED
- VERIFY LIFTING TOOLS SIZEAND LIFTING
CAPACITY.
2190 - 0000 3.00 CASING P 12,750.00 RUNPRD RUN 4-1/2",12.6# 13CR-85 VAM TOP LINER TO
10/20/2017 00'.00 - 04:30 4.50
0430 - 05:00 0.50
05:00 - 05:30 0.50
05.30 - 0600 0.50
CASING
P
12,750.00
RUNPRD
CASING
P
12,750.00
RUNPRD
CASING
P
12,750.00
RUNPRD
CASING
P
12,750.00
RUNPRD
Printed 11/6/2017 1:32:57PM *All depths reported in Drillers Depths*
1169' MD
- PU, MAKE UP 8 BAKER LOCK SHOE TRACK.
CHECK FLOATS: HOLDING
- USE JET LUBE SEAL GUARD PIPE DOPE
- VERIFY TORQUE TURN WITH DUMP VALVE
TEST.
- TORQUE CONNECTIONS TO 4440 FT -LBS
- RUN 2 OMD SPLIT RIB HYDROFORM
CENTRALIZER'S ON JOINTS 1 - 74
- FILL CASING EVERY 20 JOINTS
- MUD WEIGHT WOUT = 8.7 PPG
-MUD LOSSES WHILE RIH , 1-2 BPH
RUN 4 1/7', 12.6111, 13CR VAM TOP
PRODUCTION LINER TO 3442' MD
- USE JET LUBE SEAL GUARD PIPE DOPE
(FF=1.0) ON ALL VAMTOP CONNECTIONS
- TORQUE TURN ALL 4 1/2" 12.6# VAM-TOP
CONNECTIONS TO 4440 FT -LBS
- RUN LINER PER APPROVED TALLY, INSTALL
CENTRALIZER'S PER WELL PROGRAM
- RIH AT 75.100 FPH IN CASED HOLE
- FILL LINER EVERY ON THE FLY, TOP OFF
EVERY10JTS
- MINIMAL LOSS WHILE RUNNING IN THE
HOLE -1-2 BPH LOSS RATE
RUN ATOTAL OF 78 JOINTS / 3,442'OF LINER
PICK UP AND MAKE UP WEATHERFORD 7" X
5" LINER HANGER/PACKER ASSEMBLY
- CHANGE ELEVATORS
- VERIFY SHEAR SCREWS ON LINER HANGER
AND ON LINER TOP PACKER WITH
WEATHERFORD REPRESENTATIVE
- POUR HIGH -VIS PALMIX INTO PBRAND
RE -INSTALL BONNET
BREAK CIRCULATION, CIRCULATE 1.SX LINER
VOLUMES
-STAGE PUMPS UP TO 5 BPM, 325 PSI
-MW=8.7PPGIN/OUT
NO MUD LOSSES WHILE CIRCULATING
- RIG DOWN LINER RUNNING TOOLS
LUBRICATE RIG.
-CHANGE OUT WASHPIPE.
Common Well Name: 14-16
Event Type: COM- ONSHORE (CON)
Prudhoe
North America - ALASKA - BP
Operation Summary Report
Start Date: 10/19/2017 End Date: 10/24/2017
Site: PB DS 14
X3 -0189M -C: (2,012,222.00 )
Page 2 of 11
Rig Contractor: PARKER DRILLING CO. BPUOI: USA00000813
Active datum: 14-16B Actual @88.71 usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase Description of Operations
(hr) (usfi)
08:00 - 10:00 4.00 CASING P 12,750.00 RUNPRD RUN IN HOLE ON ELEVATORS WITH 4-1/2"
10:00 - 11:00 1.00 CASING P
11:00 - 1830 7.50 CASING P
LINER ON 4" DRILLPIPE FROM 3473' MD TO
9478' MD
- PU = 160 KLBS, SO = 138 KLBS
- MONITOR DISPLACEMENT WITH TRIP TANK,
GOOD DISPLACEMENT
- FILL PIPE EVERY 10 STANDS
-MUD WEIGHT IN/OUT=8.7 PPG _
12,750.00 RUNPRD CIRCULATE BOTTOMS UP AT 9,476' MD
- STAGE UP PUMPS IN 1 BBL INCREMENTS TO
5 BPM, 630 PSI
'-OBTAIN SLOW PUMP RATES
- PERFORM FLOW CHECK BEFORE
ENTERING OPEN HOLE: STATIC
- MW 8.7 PPG IN / OUT
12,750.00 RUNPRD CONTINUE TO RUN IN THE HOLE ON
ELEVATORS WITH 4-1/2" LINER ON 4"
DRILLPIPE FROM 9476' MD TO 12160' MD ON
DRILLPIPE
- RUN IN THE HOLE ON ELEVATORS AT 60
FT/MIN
- PU = 175 KLBS, SO = 125 KLBS AT 11200' MD
- FILL PIPE EVERY 1000 FT
ENCOUNTER TIGHT HOLE CONDITIONS AT
11315' MD.
- SET DOWN 30 KLBS AT 11315' MD, MULTIPLE
ATTEMPTS TO WORK THROUGH WITH NO
SUCCESS (50 KLBS OVER UP AND DOWN)
- STAGE UP PUMPS SLOWLY IN 1 BBL
INCREMENTS TO 5 BPM, 825 PSI AND WASH
THROUGH BRIDGE.
- OBSERVE SAME ISSUES, ABLE TO WORK
THROUGH.
@ 11560' MD, WASH DOWN AT 3 BPM WITH 50
KLBS OVER UP/DOWN.
@ 11675' MD: WASH DOWN, 40 KLBS DOWN
AND 5 BPM.
@ 11740' MD: WASH DOWN, 5 BPM AND 75
KLBS DOWN.
@ 11814' MD: WASH DOWN, 5 BPM
- CONTINUE TO WORK DOWN EACH STAND,
OBSERVING SIMILAR ISSUES EVERY 30'- 40'
MD
- ATTEMPT TO WORK THROUGH BRIDGE AT
12160' MD, AND UNABLE TO BREAK OVER
COMING UP. BEGIN WORKING STUCK PIPE.
SUBMITTED
Printed 11/6/2017 1:32:57PM `All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 3 or 11
Common Well Name: 14-16
AFE No
Event Type. COM- ONSHORE (CON)
Start Date. 10/19/2017 End Date: 10/24/2017
X3 -0189M -C: (2,012,222.00)
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11/1981 1200:00AM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-16B Actual @88.71 usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth Phase
Description of Operations
. _ (hr)
(us8)
18:30 - 00:00 5.50
CASING N 12,750.00 RUNPRD
WORK TIGHT HOLE CONDITIONSAT 12,160'
MD
- WORK STUCK PIPE WITH 70 KLBS DOWN
AND 325 KLBS UP
- PUMP 40 BBL LUBE PILLAND SPOT
OUTSIDE THE SHOE. WORK PIPE.
- PUMP SECOND 40 BBL LUBE PILL OUTSIDE
THE SHOE
-AFTER SPOTTING PILL, PULL STRING INTO
1,
TENSION WITH 325 KLBS OVER AND ALLOW
LUBE PILL TO SOAK FOR ONE HOUR
- SLACK OFF AFTER ALLOWING PILL TO SOAK
TO 70 KLBS DOWN. PICK UP AND OBSERVE
WEIGHT BREAK OVER AT 285 KLBS
'- OBSERVE FREE PIPE WITH PU = 175 KLBS,
SO=122 KLBS
10/21/2017 00:00 - 02:00 2.00
CASING N 12,750.00
RUNPRD
CIRCULATE SURFACE TO SURFACE WITH
SWEEP
- RACK BACK STAND TO WORK PIPE
- 40 BBL LOW VIS / HIGH VIS SWEEP- NO
INCREASE IN CUTTINGS AT BOTTOMS UP
1
- 5 BPM, 770 PSI
-MW 8.7 PPG IN/OUT
-SEEPAGE LOSSES WHILE CIRCULATING <2
BPH__
0200 - 0400 2.00
CASING P r 12,750.00 RUNPRD
RUN IN THE HOLE WITH 41/2" VAM TOP
LINER ON 4" DRILL PIPE STANDS OUT OF THE
DERRICK FROM 12,162' MD TO TD AT 12,748'
MD
- WORKING TIGHT HOLE CONDITIONS FROM
12,162' TO TD.
- VARY TRIP PARAMETERS TO GET PIPE
DOWN STAYING WITHIN SAFE OPERATING
LIMITS OUTLINED IN WELL PROGRAM. MAX
'SLACK OFF Wr=70K, MAX PUW=325K
1
1— RUNNING SPEED 30-50 FPM. PUMP RATES:
2 BPM WITH 485 PSI, 5 BPM, 850 PSI.
- PU 175K, SO 130K
- MW IN/OUT = 8.7 PPG
- MAKE UP CEMENT HEAD AND SINGLE AND
WASH DOWN FROM 12,729' MD TO 12,754'
MD, SET DOWN 5K
PU TO LINER SET DEPTH AT 12,748' MD
(LINER SET DEPTH)
- 84 GPM, 575 PSI.
- SPACE OUT 18' IN ON SINGLE PER TALLY
PLACING 4-1/2" SHOE AT 12,748' MD
-TOTAL LOSSES WHILE RUNNING LINER IN
THE HOLE = 64 BBLS
Printed 11/6/2017 1:32:57PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 14-16 AFE No
Event Type: COM- ONSHORE (CON) Start Date'. 1011912017 End Date. 10/24/2017 X3 -0189M -C'. (2,012 222 00 )
Project: Prudhoe Bay Site: PB DS 14
Page 4 of 11
Rig Name/No.: PARKER 272
Spud Dale/Time: 8/11/1981 12:00:OOAM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOL USA00000813
Active datum. 14-16B Actual @88.7lusft (above Mean Sea Level)
Date From - To Him
Task Code
NPT Total Depth
Phase Description of Operations
(hr)
_
_ (usft)
04:00 - 09:00 5.00
CASING P
12,750.00
RUNPRD STAGE UP TO CEMENTING RATE TO
CONDITION HOLE PRIOR TO CEMENTING:
- PICK UP CEMENT HEAD
- STAGE PUMPSALLOWING FOR PRESSURE
STABILIZATION BEFORE INCREASING RATE
1 BPM: 405 PSI, 4% RETURN FLOW
2 BPM: 515 PSI, 8% RETURN FLOW
3 BPM: 635 PSI, 10% RETURN FLOW
4 BPM: 765 PSI, 12% RETURN FLOW
5 BPM: 910 PSI, 14% RETURN FLOW
- INITIAL PRESSURE AT CIRCULATING RATE _
910 PSI
-FINAL CIRCULATING PRESSURE = 885 PSI
- CIRCULATE TOTAL OF S TIMES BOTTOMS
UP
- MUD LOSSES DURING CIRCULATION = 12
BBLS
'- MUD WEIGHT IN/OUT = 8.7 PPG
- RECIPROCATE PIPE 30-60' WHILE
CIRCULATING
Printed 11/62017 1 32 57P *Ali depths reported in Drillers Depths'
North America - ALASKA- BP
Operation Summary Report
Common Well Name. 14-16 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 10/19/2017 End Date: 10/24/2017 X3 -0189M -C'. (2,012,222.00 )
Page 5 of 11
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Datei 8/11/1981
12:00:OOAM
Rig Release: 1024/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-168 Actual @88.71usft (above Mean Sea Level)
Date From - To Him
Task Code
NPT Total Depth
Phase Description of Operations
(hr)
(usfQ
09:00 - 11:30 2.50
CASING P
12,750.00
RUNPRD CEMENT4-12" PRODUCTION UNERAS
FOLLOWS:
- FILL LINES WITH WATER AND PRESSURE
TEST TO 4500 PSI FOR 5 MINUTES
- PUMP 30 BBLS OF 8.6 PPG MUD PUSH II
SPACER @ 5 BPM, 1170 PSI
- PUMP 110 BBLS OF 8.6 PPG (BIMODAL)
CEMENT @ 5 BPM, EXCESS VOLUME -80%
(YIELD 3.32 CUFT/SK), ICP = 1095 PSI, FCP =
1213 PSI
- WASH UP CEMENT IN LINES (NO CEMENT
LEFT ON TOP OF DRILL PIPE DART)
- RELEASE DART FROM WEATHERFORD
CEMENT HEAD
11:30 - 12:00 0.50 CASING P 12,750.00
PERFORM DISPLACEMENT WITH
SCHLUMBERGER CEMENT UNIT:
'- 60 BBLS PERF PILL 8.6 PPG @ 5 BPM: ICP =
1013 PSI, FCP = 975 PSI
- 30 BBLS 8.7 PPG QUIKDRIL (ova 5 BPM
- 10 BBLS 8.7 PPG QUIKDRIL @ 3 BPM FOR
DART LATCH. OBSERVE DART LATCH WITH
150 PSI, AT 95 BBLS DISPLACED
- 34 BBLS 8.7 PPG QUIKDRIL @ 5 BPM, ICP
700 PSI, FCP 740 PSI
- 11.8 BBLS 8.7 PPG QUIKDRIL @ 3 BPM,
OBSERVE PLUG BUMP AT 145.6 BBLSAWAY-
- TOTAL: 145.6 BBLS DISPLACED AT 3-5 BPM:
ICP 1000 PSI, 510 PSI
- INCREASE PRESSURE TO 2000 PSI, HOLD 5
MIN
- CHECK FLOATS: FLOATS HOLDING
- TOTAL DISPLACEMENT VOLUME 146.3 BELS
(MEASURED BY SCHLUMBERGER
MICROMOTION)
- TOTAL LOSSES FROM STAR OF JOB TO
CEMENT IN PLACE: 20 BELS
- TOTAL LOSSESAFTER CEMENT ROUNDED
THE SHOE: 1 BBL
- CEMENT IN PLACE AT 11:30 HRS
-500 PSI CEMENT COMPRESSIVE STRENGTH
REACHED AT 03:47 HRS ON 10/222017
- RECIPROCATED PIPE UNTIL 50 BBLS OF
CEMENTAROUND THE CORNER. PARKED
STRING WHEN SLACKOFF WEIGHTS
DECLINED OVER 20K IN ONE STROKE.
-SEE ATTACHED CEMENTING DOCUMENTS
RUNPRD SET LINER HANGER AND LINER TOP PACKER
PER WEATHERFORD REPRESENTATIVE
- INCREASE PRESSURE TO 3500 PSI TO SET
LINER HANGER
- SET DOWN 60 KLBS TO CONFIRM HANGER
SET
- PICK UP TO EXPOSE DOG SUB AND SET
DOWN 50 KLBS ON LINER TOP, 15 RPM TO
SET LINER TOP PACKER
- PICK UP TO REMOVE RS PACKOFF AND
CIRCULATE EXCESS CEMENT FROM LINER
TOP
Printed 11/62017 1:32:57PM *AAI depths reported in Drillers Depths'
North America - ALASKA- BP
Operation Summary Report
Page 6 of 11 1
Common Well Name 14-16
Him
AFE No
Event Type: COM- ONSHORE (CON)
Start Date, 10/19/2017 End Date: 10/24/2017
X3 -0189M -C: (2,012,222.00)
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11/1981 12:00:OOAM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-16B Actual 088.71 usft (above Mean Sea Level)
- 12:30
Date From - To
Him
Task
Code
NET Total Depth
Phase
Description of Operations
(hr)
(usft)
', 72:00
- 12:30
0.50
CASING
P
12,750.00
RUNPRD
CIRCULATE BOTTOMS UP WITH RUNNING
TOOL ABOVE LINER TOP
- 10 BPM, 1340 PSI
- -40 BBLS EXCESS CEMENT TO SURFACE
ON BOTTOMS UP _
12:30
- 13:30
1.00
CASING
P
12,750.00
RUNPRD
DISPLACE 8.7 PPG QUIKDRIL WITH 8.5 PPG
3% KCL
-10 BPM, 1450 PSI
- MW IN/OUT AT END OF DISPLACEMENT = 8.5
_
PPG
1330
- 1400
0.50
CASING
P
12,750.00
RUNPRD
CLEAN TROUGHS AFTER DISPLACEMENT.
LAY DOWN CEMENT HEAD AND SINGLE.
14:00
- 1800
4.00
CASING
P
12,750.00
RUNPRD
PULL OUT OF THE HOLE ON ELEVATORS
FROM 9200' MD TO SURFACE WITH
WEATHERFORD RUNNING TOOL
- MONITOR WELL FOR 10 MINUTES BEFORE
INITIATING TRIP OUT OF THE HOLE: STATIC
PU = 150 KLBS, SO =120 KLBS AT 8800' MD
1800
- 1830
0.50
CASING
P
12,750.00
RUNPRD
CLEAN AND CLEAR RIG FLOOR
18:30
- 19:00
0.50
CASING
P
12,750.00
RUNPRD
SERVICE TOP DRIVE
19:00
- 20:00
1.00
CASING
P
12,750.00
RUNPRD
MAKE UP 2-7/8" TEST JOINT. SUCK OUT
STACK. PULL WEAR RING.
20:00
- 21:00
1.00
BOPSUR
P
12,750.00
RUNPRD
PERFORM SHELL TEST
- MAKE UP 2-7/8" AND 4" TEST JOINTS
- RUN IN HOLE WITH TEST PLUG AND
INSTALL)
21'.00
- 00:00
3.00
BOPSUR
P
12,750.00
RUNPRD
TEST BOPE TO 250 PSI LOW, 3500 PSI HIGH
FOR 5 MINUTES EACH
- TEST WITH 2-7/8" AND 4-1/2" TEST JOINTS
- TESTED ALARMS: PVT AND FLOW SHOW
-TEST WITNESS WAIVED BYAOGCC REP
JEFF JONES
10/22/2017 00:00
- 01:00
1.00
BOPSUR
P
12,750.00
RUNPRD
RIG DOWN BOP TESTING EQUIPMENT
- PULL TEST PLUG AND INSTALL 8-718" ID
WEAR RING
- RIG DOWN ALL TESTING EQUIPMENT, BLOW
_
DOWN CHOKE AND KILL LINES
01:00
- 02.30
1.50
PERFOB
P
12,750.00
OTHCMP
RIG UP TO RUN PERF GUNS
- CONFIRM PERF GUN LAYOUT IN PIPE BARN.
- MAKE UP WELL CONTROL SAFETY JOINTS
FOR PERF GUN RUN.
- VERIFY LIFTING TOOL SIZE AND RATINGS
FOR SIZE OF PIPE BEING RAN.
0230
- 0430
2.00
PERFOB
P
12,750.00
OTHCMP
PICK UP AND RUN IN THE HOLE WITH 2-7/8"
JRC VANN GUNS PERFORATING ASSEMBLY
FROM THE PIPE SHED TO 1533' MD.
-(68 GUNS, 34 DOUBLE ASSEMBLIES) 6 SPF,
60 DEG PHASE.
- PICK UP A TOTAL OF 68 GUN ASSEMBLIES
WITH MAX FORCE FIRING ASSEMBLY, TRIPLE
CONNECTOR, FIRING HEADASSEMBLY, XO'S
AND BAKER HYD DISCONNECT (1533.67.65'
OAL)
- PU 45K, SO 45K
- MONITOR WELL WITH TRIP TANK - GOOD
DISPLACEMENT
(Di) KICK WHILE TRIPPING DRILL. AAR
Printed 1116/2017 1:32:57PM *All depths reported in Drillers Depths'
Printed 11/6/2017 1 32:57PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 7 of 11
Operation Summary Report
Common Well Name'. 14-16
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 10/19/2017 End Date: 10/24/2017
X3 -0189M -C: (2,012,222.00 )
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11/1981 12:00:OOAM
Rig Release: 1 012412 01 7
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-168 Actual @88.71 usft (above Mean Sea Level)
Date From - To Ars
Task Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
04:30 - 08:00 3.50
PERFOB P 12,750.00 OTHCMP
TRIP IN HOLE WITH 2-7/8" PERFORATING
ASSEMBLY ON 2-7/8" PAC DP
- PICK UP PAC JOINTS FROM THE PIPE SHED
(59 JTS TOTAL)
- FROM 1533' MD' MD AT TO 3384' MD.
- RUNNING SPEED = 100-125 FPM
- PUW-70K ,
- MONITOR WELL WITH TRIP TANK - GOOD
DISPLACEMENT
- CHANGE OUT HANDLING EQUIPMENT.
CLEAR RIG FLOOR_, INSTALL PS -21 SLIPS
0800 - 1300 500
PERFOB P 12,750.00 OTHCMP
TRIP IN HOLE WITH 2-7/8" PERFORATING
ASSEMBLY ON 4" DP STANDS FROM 3384' MD
TO 12,655' MD
-RUNNING SPEED =90-100 FPM
- PICKUP/SLACK OFF WEIGHTS ON DEPTH =
220/122 KLBS
'- TAGGED PLUGS AT 12,655' ON DEPTH TO
TALLY. SET DOWN 5 K, PULLED STRING IN
TENSION.
13:00 - 13:$0 0.50
PERFOB P 12,750.00 OTHCMP
CIRCULATE DP VOLUME TO ENSURE NO AIR
IN SYSTEM
- 3 BPM, 750 PSI,
8.55 PPG KCL IN/OUT
- PRE JOB SAFETY MEETING FOR LINER
1
PRESSURE TEST
- REVIEW PRESSURE CROSS CHECK LIST.
13:30 - 15:015:0 50
PERFOB P 1 12,750.00 1 OTHCMP
PRESSURE TEST 4-1/2" PRODUCTION LINER
- 250 PSI LOW / 3500 PSI HIGH FOR 5 / 30
CHARTED MINUTES
,- TEST MET BP WELLBORE INTEGRITY
TESTING CRITERIA
- LOST 15 PSI IN THE FIRST 15 MIN, LOST 2
PSI IN THE SECOND 15 MIN
1- 5.5 BBLS TO PRESSURE UP, BLED BACK 5.5
BELS
- WSUP APPROVED TEST
- SEE ATTACHED TEST CHART AND TEST
CRITERIA CALCULATOR
_
15:00 - 15:30 0.50
PERFOB P 12,750.00 OTHCMP
PERFORATE WELL WITH 2-7/8" JRC VANN
GUNS PER HALLIBURTON REP
- FOLLOW PRESSURE UP/BLEED OFF
SEQUENCE FOR 31 MINUTES TO FIRE WITH
MAXFIRE HEAD.
- 875' NET PERFS IN SAG RIVER SAND
FORMATION (FINAL PEE MEMO DATED
10/20/17), REFERENCE LOG = BAKER
DRILLING LWD LOGS
- FOUR INTERVALS, 6 SPF, 60° PHASING,
17.5G CHARGES,
- 11150' MD - 11225' MD, 75
- 11530'MD - 11550' MD, 20'
- 11650' MD - 11765' MD, 115'
- 11865'- 121 00'MD, 235'
- 12200'- 12525' MD, 325'
- 15550'- 12655' MD 105'
- OBSERVE POSITIVE SIGNS OF SHOTS
FIRING; 100 PSI LOSS AND INITIAL LOSS
RATE OF 12.5 BPH
Printed 11/6/2017 1 32:57PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 8 of ill
Common Well Name: 14-16
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 10/19/2017
End Date: 10/24/2017
X3 -0189M -C: (2,012,22Z00)
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud DateRime: 8/11/1981 12:OO:OOAM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-16B Actual @88.71usR
(above Mean Sea Level)
Date From - To
Him
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(ustt)
15:30 - 19:30
4.00
PERFOB P
12,750.00 OTHCMP
PULL UP HOLE WITH 2-7/8' PERFORATING
ASSEMBLY TO SAFETY FROM 12655' MD TO
3388' MD
- INITIAL PICKUP WEIGHT = 182 KLBS;
- PULLING SPEED = 110 FPM (PER PROGRAM)
- NO SIGNS OF WELL SANDING OR GUN
SWELLING ISSUES
- FLOWCHECK WELL FOR 10 MIN AT TOP OF
LINER, WELLTAKING FLUID -12.5SPH
19:30 - 22:00
2.50
PERFOB P
12,750.00 OTHCMP
PULL OUT OF THE HOLE WITH 2-7/8"
PERFORATING ASSEMBLY, LAYING DOWN
2-7/8" PAC DRILL PIPE SINGLES TO THE PIPE
SHED
- FROM 3388' MD TO TOP OF PERFORATING
GUNSAT 1530' MD
.- MONITOR HOLE FILL WITH TRIP TANK, WELL
TAKING -4-5 BPH
22:00 - 00:00
2.00
PERFOB P
12,750.00 OTHCMP
PULL OUT OF THE HOLE AND LAY DOWN
2-7/8" PERFORATING GUNS FROM 1533' MD
TO 1408' MD
- MONITOR HOLE FILL WITH TRIP TANK WELL
TAKING -3-4 BPH
10/23/2017 00.00 - 01:30
1.50
PERFOB P
12,750.00 OTHCMP
PULL OUT OF THE HOLE AND LAY DOWN
2-7/8" PERFORATING GUNS FROM 1408' MD
TO SURFACE
- PUW-42K , SOW-42KAT 1408' MD
- MONITOR HOLE FILL WITH TRIP TANK, WELL
TAKING -3-4 BPH
- RIG DOWN PERF GUN HANDLING
EQUIPMENT.
_
-ALL GUNS FIRED
01:30 - 02:00
0.50
PERFOB P
12,750.00 OTHCMP
CLEAN AND CLEAR RIG FLOOR OF ALL
EQUIPMENT
- PREPARE TO PICK UP 4-1/2" COMPLETION. _
02:00 - 03.30
1.50
RIGU P
12,750.00 RUNCMP
RIG UP TO RUN 4-1/2" COMPLETION
ASSEMBLY
- RIG UP TORQUE TURN EQUIPMENT
-DRAIN STACKAND PULL WEAR BUSHING
- VERIFY COMPLETION LAY -OUT IN PIPE
SHED WITH HALLIBURTON REPRESENTATIVE
AND WSL.
Printed 11/6/2017 1:32:67PM 'All depths reported in Drillers Depths'
North America -ALASKA - BP
Operation Summary Report
Common Well Name: 14-16
Event Type: COM- ONSHORE (CON) Start Date. 10/19/2017 End Date. 10/24/2017
Project: Prudhoe Bay Site: PB DSU
Rig Name/No.: PARKER 272 Spud Date/rime: 8/11/1981 1200 00AM
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00000813
Active datum: 14-16B Actual @88.71 usR (above Mean Sea Level)
Date From - To Him
Task Code
(hr)
(usR)
03:30 - 17:30 14.00
RUNCOM P
17:30 - 19:30 2.00
RUNCOM P
i
Page 9 of 17
AFE No
X3 -0189M -C: (2,012,222.00)
Printed 11/6/2017 1:32:57PM *All depths reported in Drillers Depths'
BPUOI: USA00000813
NPT Total Depth
Phase Description of Operations
(usR)
12,750.00
RUNCMP RUN 4-1/7',12.6#, 13CR-85 VAM TOP
COMPLETION ASSEMBLY TO 9316' MD
-BAKER-LOKALL CONNECTIONS BELOW THE
PRODUCTION PACKER
�- USE JET LUBE SEAL GUARD PIPE DOPE ON
ALL VAMTOP CONNECTIONS & TORQUE ALL
CONNECTIONS TO OPTIMUM MAKE UP
TORQUE; 4440 FT -LBS
- VAM REP ON LOCATION TO INSPECTALL
THREADS AND WITNESS MAKE UP
'- RUN IN THE HOLE AT 90 FPM
I- NO ISSUES RUNNING IN HOLE
-MUD LOSSES WHILE RUNNING IN THE HOLE
=-2.5 BPH
j
- PU = 136 KLBS, SO = 123 KLBS AT 91 99'MD
-MUD WEIGHT =8.5 PPG IN/OUT
SPACE OUTAND LAND TUBING HANGER:
- TAG BASE OF PBR AT 9322' MD, 5' DEEPER
THAN EXPECTED
'- SPACE OUT WITH (3) 4-1/2" VAMTOP PUPS:
Zoe% 9.84', 20.31' TO PLACE BOTTOM OF
WLEG AT 9316' MD. HALF WAY INSIDE THE
PER
�- MAKE UP AND LAND TUBING HANGER PER
CAMERON PROCEDURE.
- RUN IN LOCK DOWN SCREWS PER
i
CAMERON REP
- SEEATTACHED TUBING TALLY.
SIMOPS:
- LAY DOWN 4" DRILLPIPE OFFLINE WHILE
RUNNING COMPLETION
12,750.00
RUNCMP REVERSE CIRCULATE CLEAN BRINE AND
CORROSION INHIBITED BRINE DOWN THE
BACKSIDE, TAKING RETURNS UP THE
TUBING
- REVERSE 145 BBLS OF CLEAN 8.6 PPG
BRINE, 3.5 BPM,650 PSI
- REVERSE 110 BBLS OF INHIBITED 8.6 PPG
BRINE, 3.5 BPM 650 PSI
- REVERSE 72 BBLS OF CLEAN BRINE, -
PUMP 5 BBLS DOWN TUBING TO FLUSH
RHC -M BALL SEAT
- ENSURE BBL IN / BBL OUT WHILE
CIRCULATING
I- FLOW CHECKAFTER CIRCULATION
COMPLETE: STATIC
-MUD WEIGHT IN/OUT= 8.6 PPG
Printed 11/6/2017 1:32:57PM *All depths reported in Drillers Depths'
North America -ALASKA - SP
Page 10 of 11
Operation Summary Report
Common Well Name: 14-16
AFE No
Event Type: COM- ONSHORE (CON) Start Date: 1011912017 End Date- 10/24/2017
'X3 -0189M -C. (2r012,222 00 )
Project: Prudhoe Bay Site: PB DS 14
Rig Name/No.: PARKER 272 Spud DateTme: 8/11/1981 12.00.00AM
Rig Release: 10/24/2017
Rig Contractor: PARKER DRILLING CO. _
BPUOI: USA00000813
Active datum: 14-16B Actual @88.71 usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) _.- _-- (usft)
19:30 - 22:30 3.00 RUNCOM P 12,750.00 RUNCMP
SET PACKER AND TEST COMPLETION AS
FOLLOWS:
- MAKEUP LANDING JOINT AND DROP
REGULAR BALLAND ROD ASSEMBLY
-ALLOW BALLAND ROD TO FALL FOR 10 MIN.
- PRESSURE UP ON TUBING TO 250 PSI LOW
FOR 5 CHARTED MIN (SHUT IN KILL HCR TO
ISOLATE PUMP), GOOD TEST
- PRESSURE UPAND START TO SET THE 7"x
41/2" HES'TNT' PACKER AT 1900 PSI, FULL
SET AT -3000 PSI
- CONTINUE TO PRESSURE UPAND TEST
THE TUBING 3500 PSI FOR 30 CHARTED MIN
I _ LOST 50 PSI IN FIRST 15 MIN AND 10 PSI IN
THE SECOND 15 MIN, TEST MET BP
PRESSURE TESTING CRITERIA FOR WBE
'- PUMPED 2.5 BLS GOT BACK 2.5 BBLS-
CORRECT TO CALCULATED
- BLED PRESSURE ON THE TUBING TO 2000
PSI
- PRESSURE TEST THE PACKER AND IA
.250/3500 PSI FOR 5/30 CHARTED MIN
- LOST 15 PSI IN THE FIRST 15 MIN AND 5 PSI
IN THE SECOND 15 MIN, TEST MET BP
PRESSURE TESTING CRITERIA FOR WBE
- 3.5 BBLS PUMPED AND 3.5 BBLS BLED BACK
-CORRECT TO CALCULATED
DISCUSS PRESSURE TEST RESULTS WITH
WSUP AND RECEIVE AUTHORIZATION TO
PROCEED
BLEED OFF PRESSURE ON TUBING AND
SHEAR DCK VALVE. PUMP BOTH WAYSAND
VERIFY CIRCULATION BOTH WAYS.
- 2 BPM, 750 PSI DOWN THE TUBING
- 2 BPM, 450 PSI DOWN THE IA
SEE ATTACHED TEST CHART AND TEST
- _
CRITERIA CALCULATOR
22'.30 - 00:00 1.50 RUNCOM P 12,750.00 RUNCMP
_
FREEZE PROTECT WELL TO -2100' MD WITH
70 BBLS OF DIESEL
- RIG UP FOR FREEZE PROTECT OPERATION
- REVERSE CIRCULATE 70 BBLS OF DIESEL
AT 2 BPM, 875 PSI
-ALLOW THE WELL TO UJUBE FOR 1 HOUR
SIMOPS: LAY DOWN 4" DRILL PIPE UTILIZING
OFF-LINE STAND BUILDING EQUIPMENT.
10/24/2017 00.00 - 01'.00 1.00 RUNCOM P 12,750.00 RUNCMP
FINISHALLOWING THE WELLTO U -TUBE
DIESEL FREEZE PROTECT
- ALLOW THE WELL TO U -TUBE FOR 1 HOUR
- MONITOR WELL FOR 10 MINUTES AFTER U-
TUBE.STATIC
Printed 11/6/2017 1-.32:57PM *All depths reported in Drillers Depths'
UTILIZING OFF-LINE STAND BUILDING
EQUIPMENT.
07:30 - 09:30 2.O�SUR P 12,750.00 RUNCMP NIPPLE UP TUBING HEADADAPTER & 4 1/16"
DOUBLE MASTER VALVE DRY HOLE TREE.
PRESSURE TEST TUBING HEAD ADAPTER
TBG SPOOL VOID
- 250 PSI LOW FOR 5 MIN AND 4500 PSI HIGH
FOR 15 MIN TO BP PRACTICE 100218
CRITERIA (10-45)
- PASSING TEST: MEETS 10-45 TABLE 2
PRESSURE TEST ACCEPTANCE CRITERIA 3A
- PRESSURE TEST START: 4807 PSI, END:
4768 PSI LOSING < 5 PSI/MIN FOR 15 MIN
-APPROVED BY WSUP
- SEE ATTACHED CHART
- TEST WITH HYDRAULIC OIL, AMBIENT AIR
TEMP = 4°F
- PERFORM LEAK TIGHT PRESSURE TEST
WITH DIESEL TO 250 PSI LOW AND 4500 PSI
HIGH (PASSING TESTS, NO CHART
REQUIRED)
09:30 - 12:00 2.50 WHSUR P 12,750.00 RUNCMP CLEAN WELL CELLAR AND SECURE WELL.
END CON EVENT AND RELEASE PARKER RIG
272 AT 12:00 ON 1024/17.
-SIMOPS: GENERAL RIG DOWN
OPERATIONS THROUGHOUT RIG - SECURE
TOP DRIVE AND BRIDLE UP, RIG DOWN RIG
FLOOR
�- FINAL TMO = 0/0/0 PSI
-CLEAN UP PAD LOCATION AND CONFIRM
ACCEPTABLE CONDITION WITH PAD
OPERATOR.
Printed 11/62017 1:32:57PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 11 of 11
Operation Summary Report
Common Well Name: 1416
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 10/19/2017 End Date: 1024/2017
X3 -0189M -C: (2,012,222.00 )
Project: Prudhoe Bay
Site: PB DS 14
Rig Name/No.: PARKER 272
Spud Date/Time: 8/11/1981 12:00:OOAM
Rig Release: 10/24/2017
Rig Contractor. PARKER DRILLING CO.
BPUOI: USA00000813
Alive datum: 14-188 Actual 088.71 usft
_ _ _ _
(above Mean Sea Level)
Date From - To
Hrs
Task Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
,01:00 - 02:30
1.50
WHSUR P 12,750.00 RUNCMP
INSTALL AND TEST 41/6"H STYLETWCPER
WELLHEAD REPRESENTATIVE
- INSTALL TWC BY DRYROD
- TEST FROM BELOW WITH DIESEL; 250 PSI
LOW 3500 PSI HIGH FOR 5 CHARTED MIN
EACH; GOOD TEST
SIMOPS: LAY DOWN 4" DRILL PIPE UTILIZING
_
OFF-LINE STAND BUILDING EQUIPMENT.
02:30 - 07:30
5.00
BOPSUR P 12,750.00 RUNCMP
NIPPLE DOWN BOPE AND HIGH PRESSURE
RISER
- PUMP OUT STACK AND CLEAN DRIP PANS
-DE -ENERGIZE ACCUMULATOR
- LET AIR OUT OF AIR BOOTS AND PULL BELL
NIPPLE
.- RE -DRESS UPPER RAM CAVITIES WITH
412" X 7" VBR'S FOR NEXT WELL
- BREAK STACK AND RACK BACK ON STUMP
- NIPPLE DOWN HIGH PRESSURE RISERS
AND LAY DOWN TO PIPE SHED
- SIMOPS: LAY DOWN 4" DRILL PIPE
UTILIZING OFF-LINE STAND BUILDING
EQUIPMENT.
07:30 - 09:30 2.O�SUR P 12,750.00 RUNCMP NIPPLE UP TUBING HEADADAPTER & 4 1/16"
DOUBLE MASTER VALVE DRY HOLE TREE.
PRESSURE TEST TUBING HEAD ADAPTER
TBG SPOOL VOID
- 250 PSI LOW FOR 5 MIN AND 4500 PSI HIGH
FOR 15 MIN TO BP PRACTICE 100218
CRITERIA (10-45)
- PASSING TEST: MEETS 10-45 TABLE 2
PRESSURE TEST ACCEPTANCE CRITERIA 3A
- PRESSURE TEST START: 4807 PSI, END:
4768 PSI LOSING < 5 PSI/MIN FOR 15 MIN
-APPROVED BY WSUP
- SEE ATTACHED CHART
- TEST WITH HYDRAULIC OIL, AMBIENT AIR
TEMP = 4°F
- PERFORM LEAK TIGHT PRESSURE TEST
WITH DIESEL TO 250 PSI LOW AND 4500 PSI
HIGH (PASSING TESTS, NO CHART
REQUIRED)
09:30 - 12:00 2.50 WHSUR P 12,750.00 RUNCMP CLEAN WELL CELLAR AND SECURE WELL.
END CON EVENT AND RELEASE PARKER RIG
272 AT 12:00 ON 1024/17.
-SIMOPS: GENERAL RIG DOWN
OPERATIONS THROUGHOUT RIG - SECURE
TOP DRIVE AND BRIDLE UP, RIG DOWN RIG
FLOOR
�- FINAL TMO = 0/0/0 PSI
-CLEAN UP PAD LOCATION AND CONFIRM
ACCEPTABLE CONDITION WITH PAD
OPERATOR.
Printed 11/62017 1:32:57PM *All depths reported in Drillers Depths'
by
North America - ALASKA - BP
Prudhoe Bay
PB DS 14
14-16
14-16BPB1
500292060871
Design: 14-16BPB1
Final Survey Report
19 October, 2017
BA ER
F UGHES
a GE company
Project Prudhoe Bay, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK (4267'158641 Using Well Reference Point
Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 (26734'1586, Using geodetic scale factor
Site
PB DS 14, TR -10-14
BP
BA ER
by
Final Survey Report
F�UGHES
cr �omeam
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Site:
PB DS 14
MD Reference:
14-16B Actual @ 88.71 usft (Actual P272)
Well:
14-16
North Reference:
Tme
Wellbore:
14-16BPB1
Survey Calculation Method:
Minimum Curvature
Design:
14-16BPB1
Database:
EDM R5K-Alaska PROD -ANCP7
Project Prudhoe Bay, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK (4267'158641 Using Well Reference Point
Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 (26734'1586, Using geodetic scale factor
Site
PB DS 14, TR -10-14
Site Position:
Northing:
5,939,577430 usft
Latitude:
70° 14'26.346 N
From:
Map
Easting:
674,150.480 usft
Longitude:
148° 35'36.726 W
Position Uncertainty:
0.00 usft
Slot Radius:
0.000 in
Grid Convergence:
1.32 °
Well
14-16,14-16
Well Position
+N/ -S 0.00 usft
Northing:
5,939,293.700 usft
Latitude:
70° 14'23.277 N
+El -W 0.00 usft
Easting:
675,373.690 usft
Longitude:
148° 35' 1.368 W
Position Uncertainty
0.00 usft
Wellhead Elevation:
42.16 usft
Ground Level:
41.91 usft
Wellbore
14-16BPB1
Magnetics
Model Name Sample Date
Declination
Dip Angle Field
Strength
0
(°)
(nT)
BGGM2017 9/25/2017
17.72
80.95
57,490
-�
Design
14-168PB1
Audit Notes:
Version:
Phase:
ACTUAL
Tie On Depth: 3,192.71
Vertical Section:
Depth From (ND)
+N/ -S
+E/ -W
Direction
(usft)
(usft)
(usft)
(°)
46.55
0.00
0.00
110.00
10/192017 12:39:36PM
Page 2
COMPASS 5000.1 Build 81D
BP BA ER
by Final Survey Report F�UGHES
company
Company: North America -ALASKA -BP
Inc
Local Coordinate Reference:
Well 14-16
Project: Prudhoe Bay
WS
TVD Reference:
14-168 Actual Q 88.71 usft (Actual P272)
Site: PB DS 14
DLeg
MD Reference:
14-16B Actual @ 88.71 usft (Actual P272)
Well: 14-16
(usft)
North Reference:
True
Wellbore: 14-16BPB1
(usft)
Survey Calculation Method:
Minimum Curvature
Design: 14-16BPB1
0.00
Database:
EDM RSK - Alaska PROD - ANCP1
Survey Program Date 10/19/2017
0.00
0.00
5,939,293.700
From To
0.00
117.71
0.16
(usft) (usft) Survey (Wellbore)
Tool Name
Description
0.09
11771 3,192.71 Gyrodala Gryo (14-16)
GVD-CT-CMS
Gyrodata cont.casmg mis
0.22
3,208.00 9,437.08 BHGE ATK MWD B -1/7'x97/8"(14 -1613P
MWD+IFR+MS-WOCA
MWD +IFR+Multi Station W/O Crustal
217.71
9,523.99 10,293.25 BHGE OTK MWD 6 1/8" (14-16BPBI)
MWD+IFR+MS-WOCA
MWD +IFR+Multi Station W/O Crustal
5,939,293.921
10,365.38 10,892.20 BHGE ATK MWD 6-1/8"(14-16BPB1)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
0.16
Survey
317.71
229.00
0.19
MD
Inc
Azi (azimuth)
TVD
TVDSS
WS
EIW
Northing
Easdng
DLeg
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(ucf)
(usft)
(usft)
(°7100usft)
46.55
0.00
0.00
46.55
-42.16
0.00
0.00
5,939,293.700
675,373.690
0.00
117.71
0.16
333.51
117.71
29.00
0.09
-0.04
5,939,293.788
675,373.644
0.22
217.71
0.04
75.78
217.71
129.00
0.22
-0.07
5,939,293.921
675,373.612
0.17
317.71
0.16
105.18
317.71
229.00
0.19
0.10
5,939,293.897
675,373.781
0.13
417.71
0.33
127.69
417.71
329.00
-0.02
0.46
5,939,293.893
675,374.149
0.19
517.71
0.39
112.03
517.71
429.00
-0.32
1.00
5,939,293.402
675,374.699
0.11
617.71
0.41
106.56
617.70
528.99
-0.55
1.66
5,939,293.187
675,375.363
0.04
717.71
0.40
87.49
717.70
628.99
-0.64
2.35
5,939,293.117
675,376.056
0.13
817.71
0.36
53.57
817.70
728.99
-0.44
2.95
5,939,293.332
675,376.653
0.22
917.71
0.32
34.56
917.70
828.99
-0.02
3.36
5,939,293.758
675,377.054
0.12
1,017.71
0.38
31.14
1,017.70
928.99
0.49
3.69
5,939,294.280
675,377.372
0.06
1,117.71
0.44
38.58
1,117.69
1,028.98
1.08
4.11
5,939,294.873
675,377.769
0.08
1,217.71
0.36
59.04
1,217.69
1,128.98
1.54
4.61
5,939,295.347
675,378.267
0.16
1,317.71
0.34
108.89
1,317.69
1,228.98
1.61
5.16
5,939,295.425
675,378.815
0.30
1,417.71
0.32
137.29
1,417.69
1,328.98
1.30
5.63
5,939,295.135
675,379.292
0.16
1,517.71
0.18
149.94
1,517.69
1,428.98
0.96
5.90
5,939,294.800
675,379.568
0.15
1,617.71
0.20
280.30
1,617.69
1,528.98
0.86
5.81
5,939,294.693
675,379.478
0.35
1,717.71
0.29
232.17
1,717.69
1,628.98
0.73
5.44
5,939,294.560
675,379.109
0.22
1,817.71
0.33
210.97
1,817.88
1,728.97
0.33
5.09
5,939,294.150
675,378.771
0.12
1,917.71
0.33
212.92
1,917.68
1,826.97
-0.16
4.79
5,939,293.655
675,378.477
0.01
V. Sec
(usft)
0.00
-0.07
-0.14
0.02
0.44
1.05
1.75
243
29.
3.17
3 30
3.49
3.81
4 30
4.85
5.22
5.17
4.86
4.67
4.55
10/192017 12:39:36PM Page 3 COMPASS 5000.1 Build BID
BP BAKER
by Final Survey Report gUGHES
Emmpany
Company: North America - ALASKA - BP
Local Coordinate
Reference:
Well 14-16
Project: Prudhoe Bay
TVD Reference:
14-16B Actual 88.71
usft (Actual P272)
Site: PB DS 14
MD Reference:
14-16B Actual l8 88.71usft
(Actual P272)
Well: 14-16
North Reference:
True
Wellbore: 14-16BPB1
Survey Calculation
Method:
Minimum Curvature
Design: 14-168PB1
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Besting
DLeg
V. Sec
(usft) C)
r)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
('1100usft)
(usft)
2,017.71
0.27
203.70
2,017.66
1,928.97
-0.61
4.53
5,939,293.192
675,378.237
0.08
4.4,
2,117.71
0.36
211.62
2,117.68
2,028.97
-1.10
4.27
5,939,292.702
675,377.989
0.10
4.39
2,217.71
0.44
209.04
2,217.68
2,126.97
-1.70
3.92
5,939,292.091
675,377.652
0.08
4.27
2,317.71
0.51
184.47
2,317.67
2,228.96
-2.48
3.70
5,939,291.307
675,377.449
0.21
4.33
2,417.71
0.74
173.79
2,417.67
2,328.96
-3.57
3.74
5,939,290.222
675,377.509
0.26
473
2,517.71
1.00
167.09
2,517.66
2,428.95
-5.06
4.00
5,939,280.737
675,377.809
0.28
549
2,617.71
0.83
167.76
2,617.64
2,528.93
-6.62
4.35
5,939,287.187
675,378.193
0.17
6.35
2,618.71
0.83
167.76
2,618.64
2,529.93
-6.63
4.35
5,939,287.173
675,378.197
0.00
6.36
13 3l8"
2,717.71
0.66
132.61
2,717.84
2,828.93
-7.71
4.93
5,939,286.103
675,378.796
0.48
7.27
2,817.71
1.08
105.35
2,817.62
2,728.91
-8.35
6.26
5,939,285.495
675,380.143
0.58
8.74
2,917.71
5,87
51.37
2,91742
2,828.71
-5.41
11.17
5,939,288.553
675,384.980
5.31
12.34
3,017.71
9.49
45.41
3,016.51
2,927.80
3.57
21.04
5,939,297.762
675,394.637
3.70
18.55
3,042.71
9.91
45.61
3,041.16
2,952.45
8.53
24.04
5,939,300.783
675,397.572
1.69
20.36
3,067.71
10.57
44.11
3,065.76
2,977.05
9.68
27.18
5,939,304.006
675,400.831
2.85
22.23
3,092.71
10.78
44.13
3,090.32
3,001.61
13.00
30.40
5,939,307.404
675,403.777
0.84
24.1'
3,117.71
11.14
4346
3,114.87
3,026.16
16.43
33.89
5,939,310.911
675,406.985
1.53
26.04
3,142.71
11.67
41.92
3,139.37
3,050.66
20.07
37.04
5,939,314.622
675,410.250
2.44
27.94
3,167.71
12.16
40.22
3,163.84
3,075.13
23.96
40.43
5,939,318.591
675,413.547
2.41
29.80
3,192.71
12.28
39.67
3,188.27
3,099.56
28.02
43.83
5,939,322.726
675,416.849
0.67
31.60
14-16BPBI TIP
3,199.46
12.33
39.75
3,194.86
3,106.15
29.12
44.74
5,939,323.854
675,417.742
0.83
32.09
9 618"
3,208.00
12.40
39.86
3,203.21
3,114.50
30.53
45.92
5,939,325.285
675,418.880
0.83
32.71
14-16BPB1 KOP-Top of WS
3,222.13
13.19
35.20
3,216.99
3,128.28
33.01
47.82
5,939,327.811
675,420.724
9.19
33.64
14-16SP81 Bottom of WS
10/192017 12:39:36PM
Page 4
COMPASS 5000.1 Build 81D
BP BAER
by Final Survey Report
0U R
ompa
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 14
Well:
14-16
Wellbore:
14-16BPB1
Design:
14-16BP81
Survey
4,487.27
MD
Inc
(usft)
(°)
3,253.00
13.14
SV3
V. Sec
3,314.44
13.19
14.16BPB1 Interpolated Azimuth
3,409.71
13.06
14-1613PB1 Interpolated Azimuth
3,466.00
13.08
SV2
(°Moousft)
3,504.78
13.17
3,546.64
13.41
3,642.19
14.92
3,736.10
16.84
3,831.76
18.79
3,875.00
19.38
SV1
24.00
3,925.23
20.09
4,018.80
20.06
4,113.17
21.08
4,208.10
22.06
4,302.52
22.64
4,396.84
23.86
4,490.83
25.85
4,522.00
26.26
UG4
675,436.837
4,567.00
26.86
UG4A
5.53
4,585.99
27.11
4,679.95
30.37
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 14-16
14-16B Actual @ 88.7lusft (Actual P272)
14-168 Actual @ 88.7lusft (Actual P272)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
AN (azimuth)
4,487.27
TVD
TVDSS
NIS
E/W
Northing
Easting
DI -eq
V. Sec
-92.64
V)
4,504.19
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°Moousft)
(usft)
-93.65
31.46
4,586.57
3,247.05
3,158.34
38.68
51.68
5,939,333.769
675,424.447
2.76
35.2t
-98.68
24.00
3,306.88
3,218.17
51.24
58.17
5,939,346.276
675,430.652
2.76
37.14
12.00
3,399.67
3,310.96
71.72
64.84
5,939,366.902
675,436.837
2.86
36.40
5.53
3,454.50
3,365.79
84.29
66.77
5,939,379.513
675,438.482
2.60
33.92
1.10
3,492.27
3,403.56
93.07
67.28
5,939,388.306
675,438.785
2.60
31.39
357.21
3,533.01
3,444.30
102.69
67.14
5,939,397.916
675,438.416
2.21
27.97
350.53
3,625.66
3,536.95
125.89
64.57
5,939,421.051
675,435.314
2.33
1762
345.55
3,715.99
3,627.28
150.99
59.19
5,939,446.018
675,429.348
2.51
3.98
345.92
3,807.05
3,718.34
179.36
51.98
5,939,474.205
675,421.484
2.04
-12.49
347.92
3,847.92
3,759.21
193.13
48.79
5,939,487.896
675,417.969
2.04
-20.21
350.10
3,895.20
3,805.49
209.77
45.56
5,939,504.464
675,414.356
2.04
-28.93
_.
351.92
3,983.08
3,894.37
241.49
40.54
5,939,536.056
675,408.601
0.67
-44.5,
358.43
4,071.45
3,982.74
274.49
37.80
5,939,568.975
675,405.094
2.65
-58.36
4.45
4,159.74
4,071.03
309.33
38.72
5,939,603.828
675,405.199
2.55
-6942
9.80
4,247.08
4,158.37
344.92
43.19
5,939,639.510
675,408.839
2.24
-77.39
12.31
4,333.74
4,245.03
381.45
50.34
5,939,676.193
675,415.145
1.67
-83.16
12.40
4,419.02
4,330.31
420.04
58.80
5,939,714.966
675,422.898
2.12
-88.41
12.73
4,447.02
4,358.31
433.40
61.78
5,939,728.394
675,425.365
1.40
-90.18
13.20
4,487.27
4,398.56
453.01
66.29
5,939,746.100
675,429.423
1.40
-92.64
13.39
4,504.19
4,415.48
461.40
68.27
5,939,756.529
675,431.209
1.40
-93.65
13.79
4,586.57
4,497.86
505.30
78.90
5,939,800.667
675,440.807
3.48
-98.68
10/192017 12.39:36PM Page 5 COMPASS 5000.1 Build 81D
bp Final SBP urvey Report BAJUGHES
romoa
Company: North America - ALASKA - BP
Local Co-ordinate
Reference:
Well 14-16
Project: Prudhoe Bay
TVD Reference:
14-168 Actual @ 88.71usft
(Actual P272)
Site: PB DS 14
MD Reference:
14-188 Actual @ 88.7lusft
(Actual P272)
Well: 14-16
North Reference:
True
Wellbore: 14-168PB1
Survey Calculation Method:
Minimum Curvature
Design: 14-16BPBI
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100ueft)
(usft)
4,774.07
32.80
14.51
4,666.74
4,578.03
553.10
90.96
5,939,848.726
675,451.751
2.61
-103.7L
4,859.00
35.51
14.09
4,737.01
4,648.30
599.30
102.73
5,939,895.187
675,462.445
3.20
-10644
UG3
4,868.65
35.82
14.05
4,744.85
4,656.14
604.76
104.10
5,939,900.674
875,463.886
3.20
-109.02
4,963.42
38.64
12.37
4,820.30
4,731.59
660.57
117.17
5,939,956.776
675,475.457
3.16
-115.82
5,057.49
41.87
9.54
4,892.09
4,803.38
720.24
128.67
5,940,016.691
675,485.564
3.95
-125.43
5,152.72
45.00
7.16
4,961.24
4,872.53
785.01
138.14
5,940,081.657
675,493.521
3.71
-138.68
5,248.52
48.24
4.50
5,027.04
4,938.33
854.26
145.16
5,940,151.049
675,498.935
3.94
-155.76
5,341.53
50.55
3.01
5,087.57
4,998.86
924.71
149.77
5,940,221.588
675,501.903
2.77
-175.53
5,438.33
50.88
3.80
5,147.59
5,058.88
997.96
154.13
5,940,294.910
675,504.557
0.73
-19649
5,530.29
50.89
3.11
5,206.87
5,118.16
1,070.73
158.53
5,940,367.757
675,507.256
0.57
-217.25
5,596.00
50.85
3.16
5,248.34
5,159.63
1,121.62
161.31
5,940,418.700
675,508.861
0.09
-232.03
UGI
5,627.02
50.83
3.19
5,267.93
5,179.22
1,146.64
162.65
5,940,442.738
675,509.635
0.09
-238.99
5,719.22
50.79
2.52
5,328.19
5,237.48
1,217.01
166.21
5,940,514.168
675,511.533
0.56
-260.06
5,813.84
50.79
1.54
5,366.01
5,297.30
1,290.26
168.80
5,940,587.471
675,512.425
0.80
-2826:
5,909.06
48.87
1.46
5,447.43
5,358.72
1,363.01
170.71
5,940,660.223
675,512.638
2.02
-305.76
6,002.72
46.54
2.32
5,510.45
5,421.74
1,432.25
172.98
5,940,729.489
675,513.301
2.58
-327.30
6,096.84
43.71
3.09
5,576.85
5,488.14
1,498.86
176.12
5,940,796.156
675,514.887
3.06
-347.14
6,192.01
41.18
3.82
5,647.08
5,558.37
1,562.97
179.98
5,940,860.330
675,517.255
2.71
-36544
6,286.87
38.49
4.97
5,719.91
5,631.20
1,623.55
184.82
5,940,920.998
875,520.483
2.94
-381.80
6,365.00
36.29
5.69
5,781.99
5,693.28
1,670.78
189.02
5,940,968.318
675,523.784
2.87
-393.82
WEST SAK 2
6,381.96
35.81
5.86
5,795.70
5,706.99
1,680.71
190.02
5,940,978.268
675,524.557
2.87
-396.27
6,475.26
32.63
6.68
5,872.84
5,784.13
1,732.86
195.74
5,941,030.533
675,529.056
3.44
-408.74
6,569.99
30.06
8.59
5,953.74
5,865.03
1,781.70
202.26
5,941,079.503
675,534.434
2.91
-419.32
6,664.93
27.11
10.19
6,037.10
5,948.39
1,826.51
209.64
5,941,124.473
675,540.769
3.21
-427.71
10/192017 12:39:36PM Page 6 COMPASS 5000.1 Build 810
BP BAKER
by Final Survey Report JUGHES
aE-Pany
Company: North America - ALASKA - BP
Local Co-ordinate
Reference:
Well 14-16
Project: Prudhoe Bay
TVD Reference:
14-168 Actual Q 88.71
usft (Actual P272)
Site: PB DS 14
MD Reference:
14-168 Actual @ 88.71
usft (Actual P272)
Well: 14-16
North Reference:
True
Wellbore: 14-16BPB1
Survey Calculation
Method
Minimum Curvature
Design: 14-16SPBI
Database:
EDM R5K - Alaska PROD - ANCP7
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
WS
EIW
Northing
Easting
DLeg
V. Sec
(usft) (°)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°HOOusft)
(usft)
6,758.20
24.57
11.84
6,121.03
6,032.32
1,866.41
217.38
5,941,164.541
675,547.578
2.83
-434.01.
6,762.00
24.44
11.89
6,124.49
6,035.78
1,867.95
217.70
5,941,166.091
675,547.866
3.40
-434.31
WEST SAK 1
6,852.44
2141
13.20
6,207.78
6,119.07
1,902.34
225.32
5,941200.846
675,554.890
3.40
-438.90
6,923.00
19.38
14.75
6,273.91
6,185.20
1,926.20
231.25
5,941,224.636
675,560.055
2.98
-441.50
CM3
6,944.90
18.75
15.30
6,294.61
6,205.90
1,933.11
233.10
5,941,231.585
675,561.747
2.98
-442.12
7,041.46
15.99
19.42
6,386.76
6,298.05
1,960.63
241.62
5,941,259.293
675,569.624
3.13
-443.53
7,133.92
13.17
23.98
6,476.24
6,387.53
1,982.27
250.14
5,941,281.123
675,577.634
3.29
-442.92
7,228.09
10.33
31.12
6,568.43
6,479.72
1,999.30
258.88
5,941,298.355
675,585.961
3.38
-440.55
7,323.43
7.90
39.36
6,662.56
6,573.85
2,011.69
267.44
5,941,310.936
675,594.245
2.89
-436.73
7,390.00
6.19
45.99
6,728.63
6,639.92
2,017.72
272.92
5,941,317.093
675,599.587
2.84
-433.64
CM2
7,417.92
5.51
49.97
6,756.40
6,667.69
2,019.63
275.03
5,941,319.050
675,601.651
2.84
-432.31
7,511.63
4.33
71.21
6,849.78
6,761.07
2,023.66
281.83
5,941,323.240
675,608.350
2.30
-427.30
7,606.20
4.44
115.96
6,944.10
6,855.39
2,023.21
288.50
5,941 322 943
675,615.031
3.53
-420.88
7,701.93
6.33
147.59
7,039.42
6,950.71
2,017.13
294.86
5,941,317.009
675,621.332
3.60
-413.01
7,796.28
8.37
162.19
7,133.00
7,044.29
2,006.20
299.55
5,941,306.195
675,626.474
2.92
-404.68
7,891.04
10.44
166.50
7,226.48
7,137.77
1,991.28
303.66
5,941,291.380
675,630.934
2.31
-395.71
7,98841
12.75
169.74
7,319.90
7,231.19
1,972.52
307.56
5,941,272.716
675,635.261
2.52
-385.63
8,001.00
13.17
170.49
7,334.12
7,245.41
1,969.30
308.12
5,941,269.506
675,635.897
3.12
-384.00
Cliff
8,080.51
15.51
173.86
7,411.14
7,322.43
1,949.79
310.75
5,941,250.066
675,638.984
3.12
-374.86
8,175.40
18.67
172.52
7,501.83
7,413.12
1,922.11
314.09
5,941,222.473
675,642.962
3.36
-362.26
8,269.84
21.61
173.00
7,590.49
7,501.78
1,889.86
318.18
5,941,190.323
675,647.799
3.12
-347.38
8,363.41
24.19
172.46
7,676.68
7,587.97
1,853.74
322.79
5,941,154.330
675,653.254
2.77
-330.69
8,459.65
26.13
172.61
7,763.78
7,675.07
1,813.18
328.11
5,941,113.899
675,659.509
2.02
-311.82
10/192017 12:39:36PM
Page 7
COMPASS 5000.1 Build
81D
20
Company:
Nord America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 14
Well:
14-16
Wellbore:
14-16BPB1
Design:
14-16BPB1
Survey
MD
Inc
(usft)
P)
8,484.00
26.79
HRZ
True
8,553.79
28.69
8,648.86
29.99
8,682.00
30.01
KNG
(usft)
8,741.64
30.05
8,835.91
30.05
8,930.07
30.06
9,024.59
30.01
9,119.24
30.02
9,214.04
30.00
9,308.46
29.96
9,402.82
30.00
9,437.08
30.00
9,475.00
31.89
TSGR
7,930.22
9,476.00
31.94
INTERMEDIATE CASING 2
9,50200
33.48
TSHU
-269.61
9,523.99
34.33
9,556.20
37.24
9,585.93
39.94
9,599.00
40.93
TSAD
172.85
9,617.37
42.36
9,650.86
45.75
BP BATER
Final Survey Report UGHES
Emmpany
Local Coordinate Reference:
Well 14-16
TVD Reference:
14-1613 Actual @ 88.71usft (Actual P272)
MD Reference:
14-16B Actual @ 88.7lusft (Actual P272)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K-Alaska PROD -ANCP1
Azi (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Basting
DLeg
V. Sec
V)
(usft)
(usft)
(usft)
(usft)
(uaft)
(usft)
(°1100usft)
(usft)
172.26
7,785.58
7,696.87
1,80242
329.53
5,941,103.181
675,661.188
2.79
-306.8L
171.33
7,847.35
7,758.64
1,770.27
334.18
5,941,071.151
675,666.579
2.79
-291.441
172.75
7,930.22
7,841.51
1,724.14
340.62
5,941,025.184
675,674.089
1.55
-269.61
172.79
7,958.92
7,870.21
1,707.70
342.70
5,941,008.799
675,676.557
0.08
-262.03
172.85
8,010.55
7,921.84
1,678.09
346.44
5,940,979.283
675,680.976
0.08
-24840
172.79
8,092.15
8,003.44
1,631.25
352.34
5,940,932.600
675,687.963
0.03
-226.83
172.59
8,173.65
8,084.94
1,584.48
358.34
5,940,885.980
675,695.050
0.11
-205.20
172.74
8,255.48
8,166.77
1,537.55
364.38
5,940,839.213
675,702.179
0.10
-183.47
172.11
8,337.44
8,248.73
1,490.62
370.62
5,940,792.442
675,709.510
0.33
-161.56
172.40
8,419.53
8,330.82
1,443.64
377.01
5,940,745.624
675,716.991
0.15
-139.48
172.09
8,501.32
8,412.61
1,396.89
383.37
5,940,699.038
675,724.442
0.17
-117.51
172.86
8,583.05
8,494.34
1,350.15
389.55
5,940,652.453
675,731.702
0.41
-95.72
172.95
8,612.72
8,524.01
1,333.15
391.66
5,940,635.509
675,734.213
0.13
-87.92
172.61
8,645.24
8556.53
1,313.80
394.12
5,940,616.230
675,737.115
5.00
-79 Or
172.60
8,646.09
8,557.38
1,313.28
394.19
5,940,615708
875,737.195
5.00
-78.76
172.34
8,672.17
8,583.46
1,296.67
396.38
5,940,599.157
675,739.777
5.00
-71.01
172.21
8,686.27
8,597.56
1,287.28
397.66
5,940,589.798
675,741.269
5.00
-66.60
173.39
8,712.40
8,623.69
1,268.60
400.01
5,940,571.175
675,744.056
9.28
-58.00
174.87
8,735.84
8,646.93
1,250.15
401.90
5,940,552.781
675,746.374
9.60
49.92
173.25
8,745.59
8,656.88
1,241.72
402.78
5,940,544.373
675,747.448
11.04
-46.21
171.09
8,759.31
8,670.60
1,229.63
404.44
5,940,532.325
675,749.394
11.04
-40.51
169.42
8,783.38
8,694.67
1,206.69
408.39
5,940,509.480
675,753.877
10.70
-28.95
10/19/2017 12:39:36PM Page 8 COMPASS 5000.1 Build 81D
BP BA ER
by Final Survey Report F�UGHES
E.m,,
Company: North America -ALASKA -BP
Local Co-ordinate
Reference.
Well 14-16
Project: Prudhoe Bay
TVD Reference:
14-168 Actual @ 88.71
usft (Actual P272)
Site: PB DS 14
MD Reference:
14-16B Actual @ 88.71
usft (Actual P272)
Well: 14-16
North Reference:
True
Wellbore: 14-166PBI
Survey Calculation
Method
Minimum Curvature
Design: 14-16BPB1
Database:
EDM R5K - Alaska PROD - ANCP7
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Easting
Use
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
9,681.86
49.26
169.08
8,804.32
8,715.61
1,184.23
412.66
5,940,487.134
675758.663
11.35
-17.2L
9,713.09
53.21
168.64
8,823.87
8,735.16
1,160.35
417,36
5,940,463.365
675,763.923
12.70
-4.67
9,747.48
57.06
169.65
8,843.52
8,754.81
1,132.64
422.67
5,940,435.790
675,769.873
11.45
9.80
9,779.60
60.24
172.77
8,860.23
8,771.52
1,105.54
426.85
5,940,408.795
675,774.680
12.91
22,99
9,809.37
63.03
174.75
8,874.38
8,785.67
1,079.50
429.69
5,940,382.833
675,778.126
11.05
34.57
9,841.00
66.28
175.51
8,887.92
8,799.21
1,051.02
432.11
5,940,354.421
675,781.211
10.50
46.58
9,872.77
69.97
174.11
8,899.75
8,811.04
1,021.67
434.78
5,940,325.137
675,784.564
12.31
59.13
9,902.32
73.20
174.43
8,909.08
8,820.37
993.77
437.58
5,940,297.319
675,788.010
10.98
71.30
9,934.79
77.59
173.49
8,917.27
8,828.56
962.54
440.89
5,940,266.168
675,792.043
13.81
85.10
9,965.82
81.19
173.10
8,922.98
8,834.27
932.25
444.45
5,940,235.975
675,796.308
11.67
98.80
9,996.10
84.69
172.98
8,926.70
8,837.99
902.43
448.09
5,940,206.246
675,800.641
11.57
112.42
10,028.76
88.72
174.00
8,928.58
8,839.87
870.04
451.79
5,940,173.954
675,805.089
12.73
126.97
10,058.05
91.30
173.23
8,928.58
8,839.87
840.93
455.05
5,940,144.934
675,609.022
9.19
139.99
10,090.32
95.55
174.32
8,926.65
8,837.94
808.92
458,54
5,940,113.011
675,813.258
13.59
154.22
10,123.18
100.17
174.24
8,922.16
8,833.45
776.54
461.78
5,940,080.717
675,817.253
14.06
168.34
10,154.78
103.89
172.94
8,915.57
8,826.86
745.83
465.23
5,940,050.100
675,821.414
12.44
182.Oi
10,183.80
107.11
171.26
8,907.82
8,819.11
718.13
469.07
5,940,022.504
675,825.896
12.42
195.16
10,217.81
111.31
171.01
8,896.63
8,807.92
686.41
474.02
5,939,990.904
675,831.580
12.37
210.66
10,249.58
113.55
171.02
8,864.51
8,795.80
657.40
478.60
5,939,962.016
675,836.839
7.05
224.89
10,281.72
113.65
170.93
8,871.64
8,782.93
628.32
463.22
5,939,933.046
675,842.134
0.40
239.18
10,293.25
113.79
170.51
8,867.00
8,778.29
617.90
484.92
5,939,922.672
675,844.078
3.55
244.35
10,365.38
113.43
170.43
8,838.11
8,749.40
552.72
495.87
5,939,857.768
675,856.533
0.51
276.92
10,427.97
11249
171.08
8,813.70
8,724.99
495.84
505.12
5,939,801.121
675,867.111
1.78
305.07
10,459.45
111.93
170.64
8,801.80
8,713.09
467.06
509.75
5,939,772.464
675,872.408
2.20
319.27
10,491.50
110.95
170.98
8,790.08
8,701.37
437.61
514.52
5,939,743.136
675,877.856
3.21
333.82
10,523.19
110.17
170.77
8,778.95
8,690.24
408.32
519.22
5,939,713.959
675,883.241
2.54
348.26
10,554.52
109.45
170.59
8,768,34
8,679.63
379.23
524.00
5,939,684.993
675,888.690
2.36
362.69
10/192017 12.39:36PM Page 9 COMPASS 5000 1 Build 81D
Company: North America - ALASKA - BP
BP
Project: Prudhoe Bay
BA
Site: PB DS 14
Final
Survey
Report
Well: 14-16
F�UGHES
Wellbore: 14-16BPB1
Design: 14-16BPBI
GEmmpany
Survey
Local Coordinate
Reference:
MD Inc
An (azimuth)
TVD
(usft) 1°1
1")
TVD Reference:
(usft)
10,586.36
108.66
170.12
8,757.94
10,617.16
108.63
166.69
8,745.09
10,647.40
108.69
164.87
8,738.42
10,680.29
109.01
162.18
8,727.79
10,711.32
108.15
160.01
8,717.90
10,741.86
107.47
158.21
8,708.56
10,774.14
105.57
156.64
8,699.38
10,809.94
103.13
NIS
155.32
8,690.51
10,836.33
101.12
DLeg
154.69
8,684.96
10,867.91
99.32
153.93
8,679.36
10,892.20
98.04
(usft) --
152.67
8,675.69
10,948.00
96.04
529.04
152.67
8,658.17
Projection to TD
377.5E
8,659.38
9,476.00
534.90
8,646.09
INTERMEDIATE CASING 2
3,199.46
392.86
3,194.86
9 5/8"
10/19,2017 12:39:36PM Page 10 COMPASS 5000.1 Build BID
BP
BA
ER
Final
Survey
Report
F�UGHES
GEmmpany
Local Coordinate
Reference:
Well 14-16
TVD Reference:
14-168 Actual @ 88.71
usft (Actual P272)
MD Reference:
14-168 Actual @ 88.71usft
(Actual P272)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K-Alaska PROD -ANCP1
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(usft)
(usft)
(usft)
(usft)
(110ousft)
(usft) --
8,669.23
349.56
529.04
5,939,655451
675,894.421
2.85
377.5E
8,659.38
320.98
534.90
5,939,627.014
675,900.948
10.55
392.86
8,649.71
293.21
541.94
5,939,599.416
675,908.629
5.71
408.98
8,639.08
263.36
550.77
5,939,569.787
675,918.146
7.80
42748
8,629.19
235.54
560.30
5,939,542.194
675,928.320
7.18
445.95
8,619.85
208.38
570.67
5,939,515.281
675,939.317
6.04
464.98
8,610.67
179.80
582.55
5,939,486.994
675,951.859
7.51
485.92
8,601.80
148.13
596.67
5,939,455.858
675,966.710
7.69
510.02
8,596.25
124.75
607.57
5,939,432.536
675,978.152
7.97
528.26
8,590.65
96.74
621.04
5,939,404.853
675,992.271
6.17
550.50
8,586.98
75.29
631.83
5,939,383.661
676,003.556
7.35
567.97
8,57946
27.96
656.29
5,939,336.921
676,029.106
0.00
607.14
7.000 9.875
9.625 12.250
10/19,2017 12:39:36PM Page 10 COMPASS 5000.1 Build BID
BP BA ER
by Final Survey Report I UGHES
cc pam
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Site:
PB DS 14
MD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Well:
14-16
North Reference:
True
Wellbore:
14-16BPB1
Survey Calculation Method:
Minimum Curvature
Design:
14-16BPBI
Database:
EDM R5K - Alaska PROD - ANCP1
Formations
Measured
Vertical
Dip
Depth
Depth
Dip Direction
'
(usft(
(usft)
Name
Lithology
6,365.00
5,781.99
WESTSAK2
4,567.00
4,487.27
UG4A
Clay/Sandstone
9,507.00
8,672.17
TSHU
5,596.00
5,248.34
UGI
3,875.00
3,847.92
SW
SAND
7,390.00
6,728.63
CM2
3,466.00
3,454.50
SV2
SAND
9,599.00
8,745.59
TSAD
8,484.00
7,785.58
HRZ
6,762.00
6,124.49
WESTSAKI
6,923.00
6,273.91
CM3
4,859.00
4,737.01
UG3
Clay/Sandstone
8,682.00
7,958.92
KNG
8,001.00
7,334.12
CM1
9,475.00
8,645.24
TSGR
4,522.00
4,447.02
UG4
Clay/Sandstone
3,253.00
3,247.05
SV3
SAND
_
Design Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/43
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
3,192.71
3,188.27
28.02
43.83
14-16BPB1 TIP
3,208.00
3,203.21
30.53
45.92
14-16BPB1 KOP- Top of WS
3,222.13
3,216.99
33.01
47.82
14-16BPBI Bottom of WS
3,314.44
3,306.88
51.24
58.17
14-16BPBI Interpolated Azimuth
3,409.71
3,399.67
71.72
64.84
14-16BPBI Interpolated Azimuth
10,946.00
8,668.17
27.96
656.29
Projection to TO
Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes a GE Company
1011912017 12.'39:36PM Page 11 COMPASS 5000.1 Build BID
by
North America - ALASKA - BP
Prudhoe Bay
PB DS 14
14-16
14-16B
500292060802
Design: 14-16B
Final Survey Report
19 October, 2017
BA <ER 0F�UGHES
a GE company
project Prudhoe Bay, PBU, PRUDHOE
Map System: Alaska NA027 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27 • OGP-Use AK [4267.158641 Using Well Reference Point
Map Zone: NAD27 • OGP-Usa AK /Alaska zone 4 [26734.1586• Using geodetic scale factor
Site
PB DS 14, TR -10-14
BP
BAF ER
bp
Map
Final Survey Report
0.00 usft
Well
14-16,14-16
Well Position
GEmmpany
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 14-16
Project
Prudhoe Bay
TVD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Site:
PB DS 14
MD Reference:
14-168 Actual @ 88.71 usft (Actual P272)
Well:
14-16
North Reference:
True
Wellbore:
14-16B
Survey Calculation Method:
Minimum Curvature
Design:
14-16B
Database:
EDM R5K - Alaska PROD - ANCP1
project Prudhoe Bay, PBU, PRUDHOE
Map System: Alaska NA027 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27 • OGP-Use AK [4267.158641 Using Well Reference Point
Map Zone: NAD27 • OGP-Usa AK /Alaska zone 4 [26734.1586• Using geodetic scale factor
Site
PB DS 14, TR -10-14
Site Position:
usft
From:
Map
Position Uncertainty:
0.00 usft
Well
14-16,14-16
Well Position
+N/3 0.00 usft
+EI -W 0.00 usft
Position Uncertainty
0.00 usft
Wellbore
14-16B
Magnetics
Model Name Sample Date
BGGM2017 9/25/2017
Design
14-168
Audit Notes:
Version:
Phase:
Vertical Section.
Depth From (TVD)
(usft)
46 55
Northing:
5,939,577.430
Easting:
usft
Latitude:
Easting:
674,150.480
Dip Angle
usft
Longitude:
Slot Radius:
0.000
in
Grid Convergence:
Northing:
5,939,293.700 usft
Easting:
675,373.690 usft
Wellhead Elevation:
42.16 usft
Declination
Dip Angle
(°)
(°)
17.72
80.95
Field Strength
(nT)
57,490
ACTUAL
Tie On Depth:
10,154.78
+N/ -S
+E/ -W
Direction
(usft)
(usft)
(°)
0.00
000
110 00
Latitude:
Longitude:
Ground Level:
70° 14'26.346 N
148° 35'36.726 W
1.32 '
70° 14'23.277 N
148' 35' 1.368 W
41.91 usft
10/192017 12'44:02PM Page 2 COMPASS 5000.1 Build 81D
SAM} BP BA' ICER
€�W.r by Final Survey Report 4ER
GEmmpany
Company: Norm America - ALASKA - BP
Inc
Local Coordinate Reference:
Well 14-16
Project: Prudhoe Bay
NIS
TVD Reference:
14-166 Actual @ 88.71 usft (Actual P272)
Site: PB DS 14
DLeg
MD Reference:
14-168 Actual @ 88.71usft (Actual P272)
Well: 14-16
(usft)
North Reference:
True
Wellbore: 14-168
(usft)
Survey Calculation Method:
Minimum Curvature
Design: 14-168
0.00
Database:
EDM R5K - Alaska PROD - ANCPl
Survey Program Date 10/19/2017
0.00
0.00
5,939,293.700
From To
0.00
117.71
0.16
(usft) (usft) Survey (Wellbore)
Tool Name
Description
0.09
117.71 3,192.71 Gyrodata Gryo (14-16)
GYD-CT-CMS
Gyrodata cont.casing m/s
0.22
3,208.00 9,437.08 BHGE ATK MWD 8-1/2"x97/8"(14-16BP
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
217.71
9,523.99 10,154,78 BHGE OTK MWD 61/81'(14-16BPB1)
MWD+IFR+MS-WOCA
MWD +IFIR +Multi Station W/O Crustal
5,939,293.921
10,177.96 12, 709.45 BHGE OTK MWD 6-1/8"(14-16B)
MWD+IFR+MS-WOCA
MWD+IFR +Multi Station W/O Crustal
0.16
Survey
MD
Inc
An (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
(usft)
(°)
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
46.55
0.00
0.00
46.55
-42.16
0.00
0.00
5,939,293.700
675,373.690
0.00
117.71
0.16
333.51
117.71
29.00
0.09
-0.04
5,939,293.788
675,373.644
0.22
217.71
0.04
75.78
217.71
129.00
0.22
-0.07
5,939,293.921
675,373.612
0.17
317.71
0.16
105.18
317.71
229.00
0.19
0.10
5,939,293.897
675,373.781
0.13
417.71
0.33
127.69
417.71
329.00
-0.02
0.46
5,939,293.693
675,374.149
0.19
517.71
0.39
112.03
517.71
429.00
-0.32
1.00
5,939,293.402
675,374.699
0.11
617.71
0.41
106.56
617.70
528.99
455
1.66
5,939,293.187
675,375.363
0A4
717.71
0.40
87.49
717.70
628.99
-0.84
2.35
5,939,293.117
675,376.056
0.13
817.71
0.36
53.57
817.70
728.99
-0.44
2.95
5,939,293.332
675,376.653
0.22
917.71
0.32
34.56
917.70
828.99
-0.02
3.36
5,939,293.758
675,377.054
0.12
1,017.71
0.38
31.14
1,017.70
928.99
0.49
3.69
5,939,294.280
675,377.372
0.06
1,117.71
0.44
38.58
1,117.69
1,028.98
1.08
4.11
5,939,294.873
675,377.769
0.08
1,217.71
0.36
59.04
1,217.69
1,128.98
1.54
4.61
5,939,295.347
675,378.267
0.16
1,317.71
0.34
108.89
1,317.69
1,228.98
1.61
5.16
5,939,295.425
675,378.815
0.30
1,417.71
0.32
137.29
1,417.69
1,326.98
1.30
5.63
5,939,295.135
675,379.292
0.16
1,517.71
0.18
149.94
1,517.69
1,428.98
0.96
5.90
5,939,294.800
675,379.568
0.15
1,617.71
0.20
280.30
1,617.69
1,528.98
0.86
5.81
5,939,294.693
675,379.478
0.35
1,717.71
0.29
232.17
1,717.69
1,628.98
0.73
5.44
5,939,294.560
875,379.109
0.22
1,817.71
0.33
210.97
1,817.68
1,728.97
0.33
5.09
5,939,294.150
675,378.771
0.12
1,917.71
0.33
212.92
1,917.68
1,828.97
-0.16
4.79
5,939,293.655
675,378.477
0.01
V. Sec
(usft)
0.00
-0.07
-0.14
0.02
044
1 05
1.75
243
2.9.
317
330
3.49
381
4.30
4.85
5.22
5.17
4.86
467
4.55
10/19/2017 12:44.02PM Page 3 COMPASS 5000.1 Build 81D
Dim
Company:
North Amedca- ALASKA -BP
Project:
Prudhoe Bay
Site:
PB DS 14
Well:
14-16
Wellbore:
14-168
Design:
14-16B
Survey
MD
(usft)
2,017.71
2,117.71
2,217.71
2,317.71
2,417.71
2,517.71
2,617.71
2,618.71
13 318"
2,717.71
2,817.71
2,917.71
3,017.71
3,042.71
3,067.71
3,092.71
3,117.71
3,142.71
3,167.71
3,192.71
3,199.46
95181,
3,208.00
3,222.13
3,314.44
3,409.71
3,504.78
BP BAKER
Final Survey Report JUGHES
E -,,v
Local Coordinate Reference:
Well 14-16
TVD Reference:
14-16B Actual @ 88.7lusft (Actual P272)
MD Reference:
14-16B Actual @ 88.71usft (Actual P272)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Inc
Azi (azimuth)
TVD
NDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(')
V)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
0.27
20370
2,017.68
1,928.97
-0.61
4.53
5,939,293.192
675,378.237
0.08
4.4',
0.36
211.62
2,117.68
2,028.97
-1.10
4.27
5,939,292.702
675,377.989
0.10
4.39
0.44
209.04
2,217.68
2,128.97
-1.70
3.92
5,939,292.091
675,377.652
0.08
4.27
0.51
184.47
2,317.67
2,228.96
-2.48
3.70
5,939,291.307
675,377.449
0.21
4.33
0.74
173.79
2,417.67
2,328.96
-3.57
3.74
5,939,290.222
675,377.509
0.26
4.73
1.00
167.09
2,517.66
2,428.95
-5.06
4.00
5,939,288.737
675,377.809
0.28
5.49
0.83
167.76
2,617.64
2,528.93
-6.62
4.35
5,939,287.187
675,378.193
0.17
6.35
0.83
167.76
2,618.64
2,529.93
-6.63
4.35
5,939,287.173
675,378,197
0.00
6.36
0.66
132.61
2,717.64
2,628.93
-7.71
4.93
5,939,286.103
675,378.796
0.48
7.27
1,08
105.35
2,817.62
2,728.91
-8.35
6.26
5,939,285.495
675,380.143
0.58
8.74
5.87
51.37
2,91742
2,828.71
-5.41
11.17
5,939,288.553
675,384.980
5.31
12.34
9.49
45.41
3,016.51
2,927.80
3.57
21.04
5,939,297.762
675,394.637
3.70
18.55
9.91
45.61
3,041.16
2,952.45
6.53
24.04
5,939,300.783
675,397.572
1.69
20.36
10.57
44.11
3,065.76
2,977.05
9.68
27.18
5,939,304.006
675,400.631
2.85
22.23
10.78
44.13
3,090.32
3,001.61
13.00
30.40
5,939,307.404
575,403.777
0.84
24.1'
11.14
43.46
3,114.87
3,026.16
16.43
33.69
5,939,310.911
675,406.985
1.53
26.04
11.67
41.92
3,139.37
3,050.66
20.07
37.04
5,939,314.822
675,410.250
2.44
27.94
12.16
40.22
3,163.84
3,075.13
23.96
40.43
5,939,318.591
675,413.547
2.41
29.80
12.28
39.67
3,188.27
3,099.56
28.02
43.83
5,939,322.726
675,416.849
0.67
31.60
12.33
39.75
3,194.86
3,106.15
29.12
44.74
5,939,323.854
675,417.742
0.83
32.09
12.40
39.86
3,203.21
3,114.50
30.53
45.92
5,939,325.285
675,418.880
0.83
32.71
13.19
35.20
3,216.99
3,128.28
33.01
47.82
5,939,327.811
675,420.724
9.19
33.84
13.19
24.00
3,306.88
3,218.17
51.24
58.17
5,939,346.276
675,430.652
2.76
37.14
13.08
12.00
3,399.67
3,310.96
71.72
64.84
5,939,366.902
675,436.837
2.86
36.40
13.17
1.10
3,492.27
3,403.56
93.07
67.28
5,939,388.306
675,438.785
2.60
31.39
10/19/2017 12: 44 02P Page 4 COMPASS 5000.1 Build BID
BP BA ER
�� �P Final Survey Report I IGHES
emmcaro
Company:
North America
- ALASKA - BP
Local Co-ordinate Reference:
Wall 14-16
Project:
Prudhoe Bay
TVD Reference:
14-16B Actual @ 88.7lusft
(Actual P272)
Site:
PB DS 14
MD Reference:
14-168 Actual @ 88.71
usft (Actual P272)
Well:
14-16
North Reference:
True
Wellborn:
14-168
Survey Calculation Method:
Minimum Curvature
Design:
14-16B
Database:
EDM R5K-Alaska PROD -ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft) (')
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°NOOueft)
(usft)
3,546.64
13.41
357.21
3,533.01
3,444.30
102.69
67.14
5,939,397.916
675,438.416
2.21
27.91
3,642.19
14.92
350.53
3,625.66
3,536.95
125.89
64.57
5,939,421.051
675,435.314
2.33
17.62
3,736.10
16.84
345.55
3,715.99
3,627.28
150.99
59.19
5,939,446.018
675,429.348
2.51
3.98
3,831.76
18.79
345.92
3,807.05
3,718.34
179.36
51.98
5,939,474.205
675,421.484
2.04
-12.49
3,925.23
20.09
350.10
3,895.20
3,806.49
209.77
45.56
5,939,504.464
675,414.356
2.04
-28.93
4,018.80
20.06
351.92
3,983.08
3,894.37
241.49
40.54
5,939,536.056
675,408.601
0.67
-44.50
4,113.17
21.08
358.43
4,071.45
3,982.74
274.49
37.80
5,939,568.975
675,405.094
2.65
-58.36
4,208.10
22.06
4.45
4,159.74
4,071.03
309.33
38.72
5,939,603.828
675,405.199
2.55
-69.42
4,302.52
22.64
9.80
4,247.08
4,158.37
344.92
43.19
5,939,639.510
675,408.839
2.24
-77.39
4,396.84
23.86
12.31
4,333.74
4,245.03
381.45
50.34
5,939,676.193
675,415.145
1.67
-83.16
4,490.83
25.85
12.40
4,419.02
4,330.31
420.04
58.80
5,939,714.966
675,422.698
2.12
-88.41
4,585.99
27.11
13.39
4,504.19
4,41548
461.40
68.27
5,939,756.529
675,431.209
1.40
-93.65
4,679.95
30.37
13.79
4,586.57
4,497.86
505.30
78.90
5,939,800.667
675,440.807
3.48
-98.681
4,774.07
32.80
14.51
4,666.74
4,578.03
553.10
90.98
5,939,848.726
675,451.751
2.61
-103.70
4,868.65
35.82
14.05
4744.85
4,656.14
604.76
1D4.10
5,939,900.674
675,463.686
3.20
-109.02'
4,963.42
38.64
12.37
4,820.30
4,731.59
660.57
117.17
5,939,956.776
675,475.457
3.16
-115.81
5,057.49
41.87
9.54
4,892.09
4,803.38
720.24
128.67
5,940,016.691
675,485.564
3.95
-125.43
5,152.72
45.00
7.16
4,961.24
4,872.53
785.01
138.14
5,940,081.657
675,493.521
3.71
-138.68
5,248.52
48.24
4.50
5,027.04
4,938.33
854.26
145.16
5,940,151.049
675,498.935
3.94
-155.761
5,341.53
50.55
3.01
5,087.57
4,998.86
924.71
149.77
5,940,221.588
675,501.903
2.77
-175.53
5,436.33
50.88
3.80
5,147.59
5,058.88
997.96
154.13
5,940,294.910
675,504.557
0.73
-196.49
5,530.29
50.89
3.11
5,206.87
5,118.16
1,070.73
158.53
5,940,367.757
675,507.256
0.57
-217.25
5,627.02
50.83
3.19
5,267.93
5,179.22
1,145.64
162.65
5,940,442.738
675,509.635
0.09
-238.99
5,719.22
50.79
2.52
5,326.19
5,237.48
1,217.01
166.21
5,940,514.168
675,511.533
0.56
-260.06
5,813.84
50.79
1.54
5,386.01
5,297.30
1,290.28
168.80
5,940,587.471
675,512.425
0.80
-282.68
5,909.06
48.87
1.46
5,447.43
5,358.72
1,363.01
170.71
5,940,860.223
675,512.638
2.02
-305.76
6,002.72
46.54
2.32
5,510.45
5,421.74
1,432.25
172.98
5,940,729.489
675,513.301
2.58
-327.30
101192017
12:44:O2PM
Page 5
COMPASS 5000.1 Build 81D
BP BA ER
by Final Survey Report F�UGHES
GEmmpany
Company:
North America - ALASKA - BP
Local Coordinate
Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-168 Actual Q 88.7lusft
(Actual P272)
Site:
PB DS 14
MD Reference:
14-168 Actual a 88.71
usft (Actual P272)
Well:
14-16
North Reference:
True
Wellbore:
14-16B
Survey Calculation Method
Minimum Curvature
Design:
14-16B
Database:
EDM R5K-Alaska PROD -ANCPi
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)-
6,096.84
43.71
3.09
5,576.85
5,488.14
1,498.86
176.12
5,940,796.156
675,514.887
3.06
-3471-
6,192.01
41.18
3.82
5,647.08
5,558.37
1,562.97
179.98
5,940,860.330
675,517.255
2.71
-36544
6,286.87
38.49
4.97
5,719.91
5,631.20
1,623.55
184.62
5,940,920.998
675,520.483
2.94
-381.80
6,381.96
35.81
5.86
5,795.70
5,706.99
1,680.71
190.02
5,940,978.268
675,524.557
2.87
-396.27
6,475.26
32.63
6.68
5,872.84
5,784.13
1,732.86
195.74
5,941,030.533
675,529.056
3.44
408.74
6,569.99
30.06
8.59
5,953.74
5,865.03
1,781.70
202.26
5,941,079.503
675,534.434
2.91
-419.32
6,664.93
27.11
10.19
6,037.10
5,948.39
1,826.51
209.64
5,941,124.473
675,540.769
3.21
-427.71
6,758.20
24.57
11.84
6,121.03
6,032.32
1,866.41
217.38
5,941,164.541
675,547.578
2.83
-434.08
6,852.44
21.41
13.20
6,207.78
6,119.07
1,902.34
22532
5,941,200.646
675,554.690
3.40
-438.90
6,944.90
18.75
15.30
6,294.61
6,205.90
1,933.11
233.10
5,941,231.585
675,561.747
2.98
-442.12
7,041.46
15.99
19.42
6,386.76
6,298.05
1,960.63
241.62
5,941,259.293
675,569.624
3.13
443.53
7,133.92
13.17
23.98
6,476.24
6,387.53
1,982.27
250.14
5,941,281.123
675,577.634
3.29
-442.92
7,228.09
10.33
31.12
6,568.43
6,479.72
1,999.30
258.86
5,941,298.355
875,585.961
3.38
-440.55
7,323.43
7.90
39.36
6,662.56
6,573.85
2,011.69
267.44
5,941,310.936
675,594.245
2.89
-436.73
7,417.92
5.51
49.97
6,756.40
6,66789
2,019.63
275.03
5,941,319.050
675,601.651
2.84
-432.31
7,511.63
4.33
71.21
6,849.78
6,761.07
2,023.66
281.83
5,941,323.240
675,608.350
2.30
-427.3
7,606.20
4.44
115.96
6,944.10
6,855.39
2,023.21
288.50
5,941,322.943
675,615.031
3.53
-420.88
7,701.93
6.33
147.59
7,039.42
6,950.71
2,017.13
294.66
5,941,317.009
675,621.332
3.60
-413.01
7,796.28
8.37
162.19
7,133.00
7,044.29
2,006.20
299.55
5,941,306.195
675,626.474
2.92
-404.68
7,891.04
10.44
166.50
7,226.48
7,137.77
1,991.28
303.66
5,941,291.380
675,630.934
2.31
-395.71
7,986.41
12.75
169.74
7,319.90
7,231.19
1,972.52
307.56
5,941,272.716
675,635.261
2.52
-385.63
8,080.51
15.51
173.86
7,411.14
7,322.43
1,949.79
310.75
5,941,250.066
675,638.984
3.12
-374.86
8,175.40
18.67
172.52
7,501.83
7,413.12
1,922.11
314.09
5,941,222.473
675,642.962
3.36
-36226
8,269.84
21.61
173.00
7,590.49
7,501.78
1,889.86
318.18
5,941,190.323
675,647.799
3.12
-347.38
8,363.41
24.19
172.46
7,676.68
7,587.97
1,853.74
322.79
5,941,154.330
675,653.254
2.77
-330.69
8,459.65
26.13
172.61
7,763.78
7,675.07
1,813.18
328.11
5,941,113.899
675,659.509
2.02
-311.82
8,553.79
28.69
171.33
7,847.35
7,758.64
1,770.27
334.18
5,941,071.151
675,666.579
2.79
-291.44
10/19/2017
12:44.:02PM
Page 6
COMPASS
5000.1 Build 81D
BP BAKER
bp Final Survey Report JUGHES
Emma,
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well 14-16
Project: Prudhoe Bay
TVD Reference:
14-168 Actual @ 88.71
usft (Actual P272)
Site: PB DS 14
MD Reference:
14-168 Actual Q 88.71
usft (Actual P272)
Well: 14-16
North Reference:
True
Wellbore: 14-16B
Survey Calculation Method:
Minimum Curvature
Design: 14-168
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1loousft)
(usft)
-
8,648.66
29.99
172.75
7,930.22
7,841.51
1,724.14
340.62
5,941,025.184
675,674.089
1.55
-269.6
8,741.64
30.05
172.85
8,010.55
7,921.84
1,678.09
346.44
5,940,979.283
675,680.976
0.08
-24840
8,835.91
30.05
172.79
8,092.15
8,003.44
1,631.25
352.34
5,940,932.600
675,687.963
0.03
-226.83
8,930.07
30.06
172.59
8,173.65
8,084.94
1,584.48
358.34
5,940,885.980
675,695.050
0.11
-205.20
9,024.59
30.01
172.74
8,255.48
8,166.77
1,537.55
364.38
5,940,839.213
675,702.179
0.10
-183.47
9,119.24
30.02
172.11
8,337.44
8,248.73
1,490.62
370.62
5,940,792.442
675,709.510
0.33
-161.56
9,214.04
30.00
172.40
8,419.53
8,330.82
1,443.64
377.01
5,940,745.824
675,716.991
0.15
-139.48
9,308.46
29.96
172.09
8,501.32
8,412.61
1,396.89
383.37
5,940,699.038
675,724.442
0.17
-117.51
9,402.82
30.00
172.86
8,583.05
8,494.34
1,350.15
389.55
5,940,652.453
675,731.702
0.41
-95.72
9,437.08
30.00
172.95
8,612.72
8,524.01
1,333.15
391.66
5,940,635.509
675,734.213
0.13
-87.92
9,476.00
31.94
172.60
8,646.09
8,557.38
1,313.28
394.19
5,940,615.708
675,737.195
5.00
-78.76
INTERMEDIATE CASING
2
9,523.99
34.33
172.21
8,686.27
8,597.56
1,287.28
397.66
5,940,589.798
675,741.269
5.00
-66.60
9,556.20
37.24
173.39
8,712.40
8623.69
1,268.60
400.01
5,940,571.175
675,744.056
9.28
-58.00
9,585.93
39.94
174.87
8,735.64
8,646.93
1,250.15
401.90
5,940,552.781
675,746.374
9.60
49.92
_
9,617.37
42,36
171.09
8,759.31
8,670.60
1,229.63
404.44
5,940,532.325
675,749.394
11.04
40.5
9,650.86
45.75
169.42
8,783.38
8,694.67
1,206.69
408.39
5,940,509.480
675,753.877
10.70
-28.95
9,681.86
49.26
169.08
8,804.32
8,715.61
1,184.23
412.66
5,940,487.134
675,758.663
11.35
-17.26
9,713.09
53.21
168.64
8,823.87
8,735.16
1,160.35
417,36
5,940,463.365
675,763.923
12.70
-4.67
9,747.48
57.06
169.65
8,843.52
8,754.81
1,132.64
422.67
5,940,435.790
675,769.873
11.45
9.80
9,779.60
60.24
172.77
8,860.23
8,771.52
1,105.54
426.85
5,940,408.795
675,774.680
12.91
22.99
9,809.37
63.03
174.75
8,874.38
8,785.67
1,079.50
429.69
5,940,382.833
675,778.126
11.05
34.57
9,841.00
66,28
175.51
8,887.92
8,799.21
1,051.02
432.11
5,940,354.421
675,781.211
10.50
46.58
9,872.77
69.97
174.11
8,899.75
8,811.04
1,021.67
434.78
5,940,325.137
675,784.564
12.31
59.13
9,902.32
73.20
174.43
8,909.08
8,820.37
993.77
437.58
5,940,297.319
675,788.010
10.98
71.30
9,934.79
77.59
173.49
8,917.27
8,828.56
962.54
440.89
5,940,266.168
675,792.043
13.81
85.10
9,965.82
81.19
173.10
8,922.98
8,834.27
932.25
444.45
5,940,235.975
675,796.308
11.67
98.80
10/19/2017 12:44:02PM
Page 7
COMPASS 5000.1 Build
81D
BF BAT(ER
by Final Survey Report GHES
Emmpm
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well 14-16
Project: Prudhoe Bay
TVD Reference:
14-166 Actual @ 88.7lusft
(Actual P272)
Site: PB DS 14
MD Reference:
14168 Actual Q? 88.7lusft
(Actual P272)
Well: 14-16
North Reference:
True
Wellbore: 14-168
Survey Calculation Method:
Minimum Curvature
Design: 14-168
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
EIYV
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°HOOusft)
(usft)
9,996.10
84.69
172.98
8,926.70
8,837.99
902.43
448.09
5,940,206.246
675,800.641
11.57
112.41
10,028.76
88.72
174.00
8,928.58
8,839.87
870.04
451.79
5,940,173.954
675,805.089
12.73
126.97
10,058.05
91.30
173.23
8,928.58
8,839.87
840.93
455.05
5,940,144.934
675,809.022
9.19
139.99
10,090.32
95.55
174.32
8,926.65
8,837.94
808.92
458.54
5,940,113.011
675,813.258
13.59
154.22
10,123.18
100.17
174.24
8,922.16
8,833.45
776.54
461.78
5,940,080.717
675,817.253
14.06
168.34
10,154.78
103.89
172.94
8,915.57
8,826.86
745.83
465.23
5,940,050.100
675,821.414
12.44
182.08
10,177.96
105.70
171.30
8,909.65
8,820.94
723.63
468.30
5,940,027.981
675,825.000
10.36
192.56
14-168 KOP- WS
10,209.70
103.37
172.21
8,901.69
8,812.98
693.23
472.70
5,939,997.689
675,830.110
7.85
207.10
10,239.34
101.15
173.20
8,895.39
8,806.68
664.50
476.38
5,939,969.057
675,834.454
8.17
220.38
10,270.75
99.58
171.77
8,889.74
8,801.03
633.87
480.42
5,939,938.531
675,839.206
6.71
234.65
10,302.23
98.94
169.35
8,884.67
8,795.96
603.22
485.52
5,939,908.014
675,845.014
7.85
249.92
10,334.48
98.67
166.82
8,879.74
8,791.03
572.04
492.10
5,939,876.997
675,852.316
7.80
266.77
10,365.37
98.20
163.13
8,875.20
8,786.49
542.54
500.02
5,939,847.685
675,860.920
11.91
284.30
10,397.72
98.11
159.33
8,870.61
8,781.90
512.22
510.32
5,939,817.621
675,871.924
11.63
304.35
10,429.04
98.44
155.82
6,866.10
8,777.39
483.58
522.14
5,939,789.260
675,684.408
11.14
325, 2r
10,459.69
99.69
152.29
8,861.27
8,772.56
456.36
535.38
5,939,762.365
675,898.274
12.08
347.01
10,492.31
100.41
148.35
8,855.58
8,766.87
428.46
551.28
5,939,734.844
675,914.818
12.10
371.49
10,522.48
101.85
147.31
8,849.76
8,761.05
403.41
567.04
5,939,710.162
675,931.155
5.85
394.87
10,553.98
104.78
144.68
8,842.50
8,753.79
378.00
584,18
5,939,685.160
675,948.877
12.35
419.66
10,585.02
107.49
143.14
8,633.87
8,745.16
353.91
601.74
5,939,661.483
675,966.991
9.95
444.40
10,616.80
111.32
141.79
8,823.32
8,734.61
330.14
619.99
5,939,638.149
675,985.792
12.70
469.69
10,646.91
113.15
141.66
8,811.92
8,723.21
308.26
637.25
5,939,616.679
676,003.559
6.09
493.39
10,680.13
113.28
141.99
8,798.83
8,710.12
284.26
656.12
5,939,593.125
676,022.981
0.99
519.33
10,711.76
113.57
142.01
6,786.26
8,697.55
261.39
873.99
5,939,570.678
676,041.375
0.92
543.94
10,741.25
113.98
140.94
8,774.37
8,685.66
240.28
690.80
5,939,549.963
676,058.669
3.60
566.96
1 10,775.06
110/192017
113.39
142.66
8,760.78
8,672.07
215.94
709.95
5,939,526.085
676,078.374
4.97
593.27
12:44:02PM
Page 8
COMPASS 5000 1 Build 81D
BP BAKER
by Final Survey Report JUGHES
wm� ,
Company: North America - ALASKA - BP
Local Coordinate
Reference:
Well 14-16
Project: Prudhoe Bay
TVD Reference:
14-168 Actual @ 88.71
usft (Actual P272)
Site: PB DS 14
MD Reference:
14-168 Actual ,@ 88.71
usft (Actual P272)
Well: 14-16
North Reference:
True
Wellbore: 14-16B
Survey Calculation
Method:
Minimum Curvature
Design: 14-16B
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Basting
DLeg
V. Sec
(usft) (I
(°)
(usft)
(usft)
Waft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
10,807.79
112.77
142.13
8,747.95
8,659.24
192.09
728.32
5,939,502.667
676,097.296
2.41
618.71
10,836.99
111.88
142.56
8,736.86
8,648.15
170.70
744.82
5,939,481.670
676,114.285
3.36
641.51
10,869.44
109.78
142.67
8,725.32
8,636.61
146.60
763.23
5,939,458.006
676,133.249
6.46
667.06
10,900.77
106.93
142.86
8,715.46
8,626.75
122.93
781.22
5,939,434.760
676,151.785
9.11
692.06
10,930.67
104.13
143.38
8,707.45
8,618.74
99.89
798.50
5,939,412.128
676,169.601
9.51
716.18
10,963.68
101.21
143.33
8,700.21
8,611.50
74.05
817.72
5,939,386.746
676,189.416
8.85
743.08
10,993.06
98.12
143.70
8,695.28
8,606.57
50.77
834.94
5,939,363.870
676,207.171
10.59
767.23
11,025.45
94.91
144.52
8,691.61
8,602.90
24.70
853.80
5,939,338.250
676,226.634
10.22
793.87
11,057.75
91.87
145.26
8,689.70
8,600.99
-1.68
872.35
5,939,312.316
676,245.783
9.69
820.31
11,090.21
88.83
144.08
8,689.50
8,600.79
-28.15
891.12
5,939,286.284
676,265.161
10.05
847.00
11,121.29
86.59
142.92
8,690.74
8,602.03
-53.12
909.59
5,939,261.760
676,284.206
6.11
872.90
11,152.51
86.69
141.92
8,692.57
8,603.86
-77.81
928.59
5,939,237.511
676,303.781
3.21
899.21
11,184.63
(17.46
140.42
8,694.21
8,605.50
-102.80
948.71
5,939,212999
676,324.469
5.24
926.65
11,214.03
87.64
139.43
8,695.47
8,606.76
-125.28
967.62
5,939,190.970
676,343.895
3.42
952.11
11,247.78
88.56
136.82
8,696.59
8,607.88
-150.39
990.13
5,939,166.388
676,366.985
8.20
981.85
11,279.34
8955
134.69
8,697.11
8,608.40
-173.00
1,012.15
5,939,144.304
676,389.520
7.44
1,010.2.
11,309.85
92,40
133.09
6,696.59
8,607.88
-194.14
1,034.13
5,939,123.677
676,411.986
10.71
1,038.16
11,341.12
94.95
131.40
8,694.58
8,605.87
-215.12
1,057.22
5,939,103.243
676,435.563
9.78
1,067.04
11,372.67
95.48
129.26
8,691.71
8,603.00
-235.45
1,081.17
5,939,083.474
676,459.979
6.96
1,096.50
11,401.97
94.77
128.88
8,689.10
8,600.39
-253.45
1,104.15
5,939,066.021
676,483.362
6.45
1,124.24
11,433.27
94.49
125.74
8,666.57
8,597.86
-271.92
1,129.29
5,939,048.139
676,508.923
3.74
1,154.19
11,468.09
90.80
124.53
8,685.02
8,596.31
-291.94
1,157.73
5,939,028.792
676,537.821
11.70
1,187.76
11498.18
87.49
122.74
8,685.53
8,596.82
-308.60
1,182.77
5,939,012.719
676,563.245
11.92
1,216.99
11,531.32
88.01
120.18
8,687.40
8,598.69
-325.86
1,210.99
5,938,996.114
676,591.857
8.91
1,24941
11,562.87
86.02
117.17
8,689.60
8,600.89
-340.96
1,238.60
5,938,981.661
676,619.809
9.52
1,280.52
11,592.86
67.13
114.78
8,691.39
8,602.68
-354.07
1,265.51
5,938,969.181
676,647.015
6.77
1,310.29
11,626.88
87.41
112.84
8,693.01
8,604.30
-367.79
1,296.60
5,936,956.191
676,678.412
5.76
1,344.20
10/192017 12:44 02P Page 9 COMPASS 5000.1 Build 81D
Company:
North America -ALASKA -BP
Project:
Prudhoe Bay
Site:
PB DS 14
Well:
14-16
Wellbore:
14-16B
Design:
14-166
Survey
MD Inc
Well 1416
(usft) ( )
14168 Actual @ 88.71 usft (Actual P272)
11,658.45
88.21
11,685.34
89.56
11,719.26
89.99
11,780.98
89.96
11,875.55
89.93
11,968.85
90.11
12,064.72
91.58
12,157.43
90.13
12,252.57
89.90
12,345.76
89.96
12,441.56
91.43
12,535.06
89.92
12,830.47
89.99
12,709.45
89.93
12,750.00
89.93
Projection to TD - 4112"
1,375.7L
Casing Points
BP BA ER °
Final Survey Report F yLES -
r,
Local Co-ordinate Reference:
Well 1416
ND Reference:
14168 Actual @ 88.71 usft (Actual P272)
MD Reference:
14-16BActual @ 88.71usft (Actual P272)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM RSK- Alaska PROD -ANCP1
Azi (azimuth)
TVD
TVDSS
NIS
(usft)
EIW
Northing
8.690 17 4 1/2"
Easting
DLeg
V. Sec
V)
(usft)
(usft)
(waft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
113.32
8,694.22
8,605.51
-360.16
1,325.62
5,938,944.504
676,707.711
2.95
1,375.7L
113.41
8,694.74
8,606.03
-390.82
1,350.30
5,938,934.419
676,732.631
5.03
1,402.54
112.87
8,694.87
8,606.16
404.15
1,381.49
5,938,921.820
676,764.121
2.04
1,436.41
111.94
8,694.90
8,606.19
427.67
1,438.54
5,938,899.638
676,821.690
1.51
1,498.05
111.64
8,694.99
8,606.28
462.78
1,526.37
5,938,866.580
676,910.309
0.32
1,592.60
111.91
8,694.96
8,606.25
497.39
1,613.01
5,938,833.998
676,997.728
0.35
1,685.85
113.27
8,693.54
8,604.83
-534.21
1,701.51
5,938,799.246
677,087.055
2.09
1,781.61
113.32
8,692.16
8,603.45
-570.87
1,786.65
5,938,764.581
677,173.020
1.56
1,874.15
113.66
8,692.14
8,603.43
-608.79
1,873.91
5,938,728.701
677,261.128
0.43
1,969.11
114.58
8,692.25
8,603.54
-646.87
1,958.96
5,938,692.611
677,347.038
0.99
2,062.06
114.43
8,691.09
8,602.38
-686.60
2,046.12
5,938,654.920
677,435.095
1.54
2,157.56
112.28
8,689.99
8,601.28
-723.66
2,131.95
5,938,619.869
677,521.754
2.81
2,250.68
112.76
8,690.06
8,601.35
-760.21
2,220.08
5,938,585.389
677,610.709
0.51
2,346.20
113.11
8,690.12
8,601.41
-790.98
2,292.82
5,938,556.314
677,684.137
0.45
2,425.08
113.11
8,690.17
8,601.46
-806.90
2,330.11
5,938,541.271
677,721.790
0.00
2,465.57
Measured
Vertical
Depth
Depth
(usft)
(usft)
12 750 00
8.690 17 4 1/2"
Name
Casing
Hole
Diameter
Diameter
(in)
(in)
4.500
6.125
10719/2017 12: 44.02PM Page 10 COMPASS 5000.1 Build 810
BP BA, ICER
bp Final Survey Report UGHES
GE[Ompaw
Company:
North Amerim- ALASKA -BP
Local Coordinate Reference:
Well 14-16
Project:
Prudhoe Bay
TVD Reference:
14-168 Actual @j 88.71 usft (Actual P272)
Site:
PB DS 14
MD Reference:
14166 Actual @ 88.71 usft (Actual P272)
Well:
14-16
North Reference:
True
Wellbore:
14168
Survey Calculation Method:
Minimum CuNature
Design:
14-16B
Database:
EDM R5K - Alaska PROD - ANCP7
Design Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+El -W
(usft)
(usft)
(usft)
(usft)
Comment
10,177.96
8,909.65
723.63
468.30
14-16B KOP- WS
12,750.00
8,690.17
-806.90
2,330.11
Projection to TD
Prepared By. Yosha
Baker Hughes a GE Company
10/19/2017 12.44: 02PM Page 11 COMPASS 5000.1 Build 81D
ti..a.mr�wm
PlOIeeL PBG60eay
BuyRwann.
Sift. PB16
Wq1: 14,6 a.p 9wss.�
WNlfiore 14166 opmzs
0agn:14168 (1416'10.,68) e�en4.mr
WELLBORE OETAIL5: 10-166
PfEEB:M£ybC6W1CN
,4168
cnua�aelw6lwla.w. tvair4rq rm�xmn
Easting(150 usltrn)
vaaw6volwre�ea» iuseaami0aan nlaaaavznl
Parent WNlbore: 14-18BP81
s.amrvslxmerca. sn-ry oaxa wEl
w:u.46anwren.: rcreeaa�ai�9err�laava nnl
Pe on MD: 16154.]6
Gku'bon MaM. A1�mm6uMue
Post Drilling
BA ER
IUGHES
GEmmpany
Easting (150 usftrin)
Easting(150 usltrn)
p V
O O
J V V J J J
O
O O O O O
J J
O N
J
O N O
N O O
N
Nj V N O
N O N .
pw� p m m
d N W N
N N
p
W
J J J
O N O
J J
J
O
J Q N N
Vd O N
N O
0
S,Sw
O
14-01J14 01
O O
O O O
14-02/14 026
O O O O
O O O O O
14-03/14-03-
O O O
O O O
-0
4-04!14-04A
O O
O O
14.16714-16A
14-16!14-16i
594, 500
14 01/14-01A
14-02/14.62
14-41/14-41
14 03/1403
^°0
14�04I14�04
16/14-16AP81
59413w-
°°°
14-02,'14-02
O
5 3w
6000
594, 200
14-43/14-43
d
59912w
5941050
0000
-6000
60 0
°O
°
59410w
8000
59409W-
)
000
. 5940900
s5W50:5
000
�
0 00
's91o]w
y°o°
14-15n4-15.
594060p.
5000
5840600
00
�
0
59404w_
0
�$°
o
-85/14-35
°o59903wz
5940450
C 5990300:
5000
®
0
0
14-02/14 CLI
O
5990,wj
500
00
0
-., 5940130
O
06
y 59900W,.
o°°
h
4000 000
^
14-13/14 3
Qn
5919830
$
5939950 O
C
fSw9]w
o O
y
, 5939700'3
O
Z
�+
5939556
4000
°
5309550"'
59394M
AQP (3
O° 14-1 14-166PBI
O
'. 693M
14-16B&14BPB1
ACTUAL
swreso'.
0
0
0
593s100
°
5939950'
s
0 ,4-14/ -19
5938950
5
a
a
14-12/14
593B8w
58?A350-
5938630
s93�6o'
-
,4-,6/14-166-
14-02/14-02
s936566
V
. O
w
593ww
J
NN N N N W 0
N
P N J
O/
N P N Os
P
W m N N
Easting (150 usftrin)
North America - ALASKA - BP
Prudhoe Bay
PB DS 14
14-16
14-16B
14-16B
AOGCC Post Drilling Offset Report
19 October. 2017
BATIGHES
a GE company
(rel OC'
0',_o C
k
o/
F'i..
North America - ALASKA - BP
Prudhoe Bay
PB DS 14
14-16
14-16B
14-16B
AOGCC Post Drilling Offset Report
19 October. 2017
BATIGHES
a GE company
(rel OC'
0',_o C
BP BAKER
Lip BP
Report JUGHES
GE[ompany
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 14
Site Error:
0.00usft
Reference Well:
14-16
Well Error:
0.00usft
Reference Wellbore
14-168
Reference Design:
14-16B
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 14-16
14-168 Actual @ 88.71 usft (Actual P272)
14-16B Actual @ 86.71 usft (Actual P272)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
14-16B
GVD-CT-CMS
Filter type:
NO GLOBAL FILTER: Using user defined selection 8 filtering criteria
WARNING: There is hidden tight data in this project
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 500.00usft Error Surface:
Elliptical Conic
Survey Program Date 10/19/2017
From To
(usft) (usft) Survey(Wellbone) Tool Name Description
117.71
3,192.71 Gyrodata Gryo (14-16)
GVD-CT-CMS
Gyrodata cont.casing mls
3,208.00
9,437.08 BHGEATKMWDB-1/2"x97/8"(14-16BP
MWD+IFR+MS-WOCA
MWD + IFR +Multi Station W/O Crustal
9,523.99
10,154.78 BHGEOTKMWD61/8"(14-16BPBl)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
10,177.96
12,709.45 BHGE OTK MWD 6-1/8"(14-16B)
MWD+IFR+MS-WOCA
MWD + IFR +Muth Station W/O Crustal
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
PB DS 14
14-01 - 14-01 - 14-01
1,966.55
1,950.00
185.81
26.73
159.08
Pass - Major Risk
14 -01 -14 -01A -14-01A
1,971.34
1,950.00
185.84
26.76
159.08
Pass -Major Risk
14-02 - 14-02 - 14-02
2,740.76
2,725.00
263,46
36.57
226.90
Pass - Major Risk
14-02 - 14-02A- 14-02A
2,746.05
2,725.00
263.54
36.65
226.90
Pass - Major Risk
14-02 - 14-02B - 14-02B
2,746.05
2,725.00
263.54
36.65
226.90
Pass - Major Risk
14-02 - 14-02C - 14-02C
2,743.97
2,725.00
263.51
36.62
226.90
Pau - Major Risk
14-02 - 14-02CL1 - 14-02CL1
2,743.97
2,725.00
263.51
36.62
226.90
Pass - Major Risk
14-03 - 14-03 - 14-03
3,234.63
3,300.00
92.08
44.47
47.70
Pass - Major Risk
14-03 - 14-03A - 14-03A
3,234.63
3,300.00
92.08
44.47
47.70
Pass - Major Risk
14-04 - 14-04 - 14-04
2,613.62
2,675.00
138.79
50.05
88.77
Pass - Major Risk
14-04 - 14-04A - 14-04A
2,613.62
2,675.00
138.79
50.05
88.77
Pass - Major Risk
14-12 - 14-12 - 14-12
12,559.61
9,225.00
305.44
121.38
187.02
Pass - Major Risk
14-13 - 14-13 -14-13
2,795.81
2,775.00
358.22
38.13
320.13
Pass - Major Risk
14-14 - 14-14 - 14-14
2,392.39
2,375.00
253.00
40.06
213.01
Pass - Major Risk
14-15 - 14-15 - 14-15
3,012.00
3,000.00
84.18
40.53
43.65
Pass - Major Risk
14-16 - 14-16 - 14-16
3,514.08
3,500.00
31.18
5.88
25.65
Pass - Major Risk
14 -16 -14 -16A -14-16A
3,514.08
3,500.00
31.18
5.88
25.65
Pass -Major Risk
14-16-14-16APB1-14-16APB1
3,514.08
3,500.00
31.18
5.88
25.85
Pass -Major Risk
14-16 - 14-16BPB1 - 14-16BPBI
10,462.99
10,475.00
69.27
10.40
64.84
Pass - Major Risk
14-35 - 14-35 - 14-35
4,976.67
4,800.00
266.78
60.80
211.70
Pass - Major Risk
1441-1441-1441
6,033.65
5,525.00
388.53
66.10
322.71
Pass - Major Risk
1443 - 14-43 - 1443
5,396.07
5,100.00
309.91
59.76
250.43
Pass - Major Risk
10/192017 12.52.30PM // ( t / / ) ) Made 2 of 3 / / / / COMPASS 5000.1 Build 81D
BP
BTER
by Anticollision Report UGHES
&omp ny
Company:
North America -ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 14
Site Error:
0.00usft
Reference Well:
14-16
Well Error:
0.00usft
Reference Wellbore
14-16B
Reference Design:
14-16B
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 14-16
14-16B Actual @ 88.71 usft (Actual P272)
14-16B Actual @ 88.71 usft (Actual P272)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to 14-16 B Actual Q 88.71 usft (Actual
Coordinates are relative to: 14-16
Onset Depths are relative to Offset Datum
Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK
Central Meridian is 150° 0'0.000 W'
Grid Convergence at Surface is: 1.33°
10/192017 12.52:30PM // I I // l/)✓age 3 of 3 / / COMPASS 5000 1 Build 81D
rnmea 1120/2017 1:20:43PM
North America - ALASKA - BP
Page 1 of 3
Cementing Report
Pro�' Pr dhoe �'
'
- _ -. _ — _ _
Site: PB OS 74
_ Report no.. 1 Report date: 10/6/2017
-
Event Type: RE-ENTER- ONSHORE (RON)
SWtl DateRme: &11/1981
Start Date: 9/24/2017 End Date:
AFE No.: -
Contractor PARKER DRILLING CO.
Rig Name/No.: PARKER 272 Rig Release: 10/24/2017 X3 -0189M -C: (7,812,778.23)
BPUOI: USAGODOO813
Active datum: 14-160ACtual 988.71usft (above Mean Sea Level)
---
General Information
Job type: Primary
Cement job start date/time: 10/6/2017 5:OOPM
Job end date/time: 10/6/2017 7 30P
Cement Company: SCHLUMBERGER
Cementer: KYLE CHRISTENSEN
Cemented String: INTERMEDIATE CASING 2
String Size: 7.000 (in)
String Set TMD: 9,478.00 (usft) Hole Size: 9.875 (in)
Pipe Movement
Pipe Movement: RECIPROCATING
Rotating Time (Start -End):
RPM:
Rotating Torque (initlavg/max): (ft-Ibf)
Reciprocating Time (Start -End). 5:30:00 am - 7:30:00 pm
Recip Drag Up/Doom: 20.0 - 20.0 (kip)
SPM: 1.00 (spm) Stoke Length: 9.00 (usft)
Fluid Name: NEW MUD
Fluids (1 of 4)
Slurry Type: SPACER
Purpose: SPACER
Class:
SPACER Description:
MUD PUSH 11 Density: 12.00 (ppg)
Yield:
Mix Water Ratio:
Excess:
Mix Method: BATCH
Sacks Used:
Water Volume:
Excess Slurry Volume:
0.0 (bbl) Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well:
Slurry Volume:
35.0 (bbl) Excess Measured From:
Mud Type: LSND
Density:
10.50 (ppg) PV: 11.00 (cp)
YP: 18.000 (lbr/1008-) Viscosity: 49.00 (algt)
Gels 10 Sec: 5.000 (Ibf/100f?)
Gets 10 Min:
7.000 (Ibf/100ft-)
Fluid Name: NEW MUD
Fluids (2 of 4)
Slurry Type. CEMENT
Purpose. PRIMARY
Class:
G -CLASS Description:
TAIL SLURRY Density: 15.80 (ppg)
Yield 1.1700 (ft'/sk)
Mix Water Ratio:
5.204 (gal/sk94) Excess:
40.00(%) Mix Method: BATCH
Sacks Used'. 403.00 (941b sacks)
Water Volume:
49.9 (bbl) Excess Slurry Volume:
23.0 (bbl) Density Measured by: DENSOMETER
Other Volume.
Total Vol in Well:
Slurry Volume:
84.0 (bbl) Excess Measured From: EST. GAUGE HOLE
Mud Type. LSND
Density:
10.50 (ppg) PV: 11.00 (cp)
YP; 18.000 (Ibf/100ft2) Viscosity; 49.00 (s/qt)
Gels 10 Sec: 5.000 (Itd11001t.)
Gels 10 Min:
7.000 (Ibf/100R')
rnmea 1120/2017 1:20:43PM
Printed 11/20/2017 120'.43PM
Pace 2 M 3
North America - ALASKA - BP
Cementing Report
Common Well Name: 14-16 / 03
1Report no.: 1 Report data: I OIW2017
Project Prudhoe Bay
- —
Site: PB DS 14
Spud DateTme: 8/11/1981
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 91242017 End Deft:
AFE No.:
Contractor PARKER DRILLING CO.
NamdNo.: PARKER 272 Rip Release: 10242017
X3 -0189M -C: (7,812,778.23 )
BPUOI: USA00000813
ArftiveRip tlatum: 14188 ACtual Q88.71usft(stove Mean See Level)
AddRlves
Name
Type
Amount Units
Concentration Unit
D206
ANTIFOAMAGENT
60.00 GALS
0.100 GAUSX
D047
ANTIPOAMAGENT
45.00 GALS
0.100 GAUSX
D065
DISPERSANT
148.00 LBS
0.350 %BWOC
D600 G
GAS -BLOCK
902.00 GALS
2.000 GAUSX
D-167
FLUID LOSS
42.00 LBS
0.100 % BWOC
D-177
RETARDER
18.00 GALS
0.040 GAUSX
Field Name: NEW MUD,
Fluids (3 of 4)
Slurry Type: SPACER
Purpose: SPACER
Class:
OTHER Description:
FRESH WATER Density: 8.33 (ppg)
Yield:
Mix Water Rada:
Excess:
Mix Method: ON -THE -FLY
Socks Used:
Water Volume:
Excess Slurry Volume:
0.0 (bol)
Density Measured by:
Other Volume:
Total Vol in Well:
Slurry Volume:
10.0 (bid)
Excess Measured From:
Mud Type: LSNO
Density:
10.50 (ppg) PV: 11.00 (cp)
YP:
18.000 (Ibf/100ft-) Viscosity: 49.00 (slot)
Gels 10 Sec: 5.000 (brf/100ft2)
Gets 10 Min:
7.000 (Ibf/10082)
Fluid Nam: DISPLACEMENT
Fluids (4 of 4)
Slurry Type'. DISPLACEMENT
PurposeDISPLACEMENT
Class'.
OTHER Description:
DISPLACEMENT Density: 10.50 (ppg)
Yield
Mix Water Ratio:
Excess:
Mix Method:
Sacks Used
Water Volume:
Excess Slurry Volume:
0.0 (bbl)
Density Measured by. PRESS. SAL
Other Volume.
Total Vol in Well:
Slurry Volume:
349.6 (bol)
Excess Measured From:
Mud Type. LSNO
Density:
10.50 (ppg) PV: 11.00 (op)
YP:
18.000 (Ib1/100ft0 Viscesity: 49.00 (s/qt)
Gels 10 Seo: 5.000 (Ibf/100ft2)
Geis 10 Min:
7.000 (Ibf/100ft2)
Printed 11/20/2017 120'.43PM
Printed 11/20/2017 1:20:43PM
North America - ALASKA - BP
Page 3 of 3
Cementing Report
Common Well Name: 14-16 / 03
--F
Report no.: 1 Report date 10/8/2017
Project Prudhoe Ba
1 Y
'Site: PB DS 14
--
- ---
�, Spud Date/time: 8/11/7981
- — —
Event Type: RE-ENTER-ONSHORE (RON)
_- -- I —
— -- --
- -- — -
Start Date: 8/24/2017 End Dale:
AFE No
X3-0189M-C: (7,812,778.23 )
Contractor. PARKER DRILLING CO. Rig Name/No.. PARKER 272 Rig Release: 10/24/2017
BPUOI: USA00000813
-Active datum: 14168 Actual @88.71usft (above Mean Sea Leve0
-
Stages
Stage
Stage Type
Est, Top
Est. Bottom
Mud Cire
Mud Circ.
Top
Bottom
Plug
Pressure
Float
Pressure
Ratums
Circulate
Cmt Vol to
Total
Annular
no.
(usft)
usft)
Rate
I
Press.
Plug
Plug
Bumped
Bumped
Heid
Hem
Prior
Surface
Mud Lost
Flow
(gpm)
(psi)
(poi)
(min)
(hr)
(bbl)
(bbl)
After
1
PRIMARYCEIVIENT
7,670.00
9,478.00
5.0
450.1
V
I Y
V
1 1,3N.o0
V
5.m o
11.501
0.0
1,392.0
Pumping Schedule
Fluid pumped
Volume
Avg.
Max Disp.
Slurry Top
Slurry Base
Start Mix Cmt
Start Slurry
Pumping end
Start Disp
Foam
Gas Type
Gas Vol
BH circ.
Bh static
Pumped
Disp.
Rate
TMD
TMD
I
Pmp
date/time
job
Used
temp.
temp.
(bbl)
Rate
(bbl/min)
(usft)
(usft)
bbymin
NEW MUD-FRESHWATER
10.0
N
NEWMUD-SPACER
35.0
7,439.00
7,670.00
N
WEIGHTED
NEWMUD-TAILSLURRV
84.0
7,670.00
9,478.00
N
DISPLACEMENT-
349.6N
DISPLACEMENT
Testa
Casing Test
Shoe Test
Liner Top Test
Test Pressure: 3,500.00 (psi)
FIT/LOT:
10.00 (ppg)
Liner Overlap:
(usft)
Time: 30 (min)
Tool:
N
Positive Test:
(ppg)
Positive Test Tool:
N
Cement Found between Shoe and Collar:
N
Open Hole Length: 20.00 (usft)
Negative Test:
(ppg)
Negative Test Tool:
N
Hours Before Start: (hr)
Time before test:
(hr)
Cmt Found on Tool:
N
Log/Survey Evaluation
Interpretation Summary
CBL Run: N
Cement Top:
7,670.00 (usft)
Under Pressure: (psi)
How Determined:
CALCULATED
Bond Quality:
TOC Sufficient.
V
CET Run: N
Job Rating:
GOOD
Bond Quality:
If Unsuccessful, Detection Indicator.
Temp Survey: N
Remedial Cement Required.
N
Him Prior to Log: (hr)
How Determined:
Printed 11/20/2017 1:20:43PM
rnmea nn OLu1/ 8:32:3BAM
North America - ALASKA - SP
Page 1 of 2
Cementing Report
Common Well Name 14-16 / 04
-- ---
P101F Prudhoe Bay ------
-Spud
- -- --
Site: PB D514 --- - -- -- -- --
- -- Report no.: 2 Report date_10/21/2017-
--
Event Type: COM- ONSHORE (CON)-
-- _— --- - -r - -
DateRime: e/1 V19B1
- - -
Siert Date- 10/19/2017 End Date: 10/24/2017
AFE No - - -- - --
Contractor. PARKER DRILLING CO.
_ _— _-
-
Rig Name/No.: PARKER 272 Rig Release: 10/24/2017 X3-0189M-C'. (2012,222.00)
BPUOI: USAOOOOOBI3
j Active datum: 14-168 Actual @88.71ua L
sft (above Mean Seeve0
1 - - - - - - - ---- - - -
General Info r a on
Job type: Primary
Cement job start date/time: 10/21/2017 9:OOAM
Job end date/time: 10/21/2017 11.30AM
Cement Company: SCHLUMBERGER
Cemented Strang: PRODUCTION LINER 1
Strang Size:
Cementer: KYRAJONES
4.500 (in)
String Set TMD: 12,748.00 (usft) Hole Size: 6.125 (in)
Pipe Mownxrrd
Pipe Movement: RECIPROCATING
Rotating Time (Start-End).
RPM:
Rotating Torque (initfavg/max): (ft-Ibf)
Reciprocating Time (Start-End):
Recip Drag Up/Down: - (kip)
SPM:
Stroke Length:
Fluld Name. SPACER
Fluids (1 of 2)
Slurry Type: SPACER
Purpose: SPACER
Class:
Description:
MUD PUSH II Density: 8.60 (ppg)
Yield:
Mix Water Ratio:
Excess:
Mix Method BATCH
Sacks Used:
Water Volume:
Excess Slurry Volume:
0.0 (bbl) Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well:
Slurry Volume:
30.0 (bbl) Excess Measured From:
Mud Type:
Density:
8.55 (ppg) PV: 0.00 (cp)
YP: 0.000 (Ibf/100ft2) Viscosity: 0.00 e/qt)
Gels 10 Sec: 0.000 (Ibf/100f -)
Gels 10 Min:
0.000 (Ibf/took')
Fluid Name: CEMENT
FIUMa (2 of 2)
Slurry Type. CEMENT
Purpose: PRIMARY
Class:
OTHER Description:
LEAD SLURRY Density: 8,g0 (ppg)
Yield : 3.3200 (ft'/Bk)
Mix Water Ratio:
13.649 (gal/sk94) Excess:
80.00(%) Mix Method: ON-THE-FLY
Sacks Used: 186.00 (941b sacks)
Water Volume:
60.4 (bbl) Excess Slurry Volume:
48.9 (bbl) Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well:
Slurry Volume:
110.0 (bbl) Excess Measured From: EST, GAUGE HOLE
Mud Type:
Density:
8.55 (ppg) PV: 0.00 (cp)
YP: 0.000 (Ibf/100ft') Viscosity: 0.00 (s/qt)
Gels 10 Sec: 0.000 (Ibf/100fN)
Gels 10 Min:
0.000 (Ibf/100ft-)
Addlavaa
Name
Type
Amount
Units
Concentration Unit
D206
ANTIFOAM AGENT
D167
FLUID LOSS
0.090
GAUSx
D085
DISPERSANT
0.900
%BWOC
D800 G
GAS-BLOCK
0.300
%BWOC
1.624
GAvsx
rnmea nn OLu1/ 8:32:3BAM
Printed 11/17/2017 8:32:38AM
Page 2 of 2
North America - ALASKA - BP
Cementing Report
Report no. 2 Report date: 10/21/2017
Common Well Name: 14-18 / 04
Project' Prudhoe Bay
Site: PB DS 14
_ _ Spud Date/Time: BH1/1981
Event Type: COM- ONSHORE (CON)
Start Date. 10/19/2017 End Date: 10/24/2017 AFE No.:
Contractor: PARKER DRILLING CO.
Rig Name/No.. PARKER 272 Rig Release: 10/24/2017 X3-0189M-C: (2,012,222.00)
JBPUOI:
USA00000813
Active datum. 14-188 Actual ®88.71 usft (above Mean Sea Level)
Fluld T" s
Thick ame
Thick
Free water
Free water
Fluid loss
Fluid loss
Fluid loss
Comp
Comp
Comp
Comp Comp Strength
Comp Strength
(hr)
temp.
M
temp.
(cU30min)
temp.
press.
Strength
Strength
Strength
Strength Time Pressure 2
Temperature 2
(°F)
(°F)
(°F)
(psi)
Time 1
Pressure1
Temperature 1
2 (psi)
(°F)
min
si
°F)
min
9.28
90.00
0.00
80.00
44.0
180.00
1,000.00
Stages
Stage
Stage Type
Est. Top
Est Bottom
Mud Circ.
Mud Circ.
Top
Bottom
plug
Pressure
Float
Pressure
Returns
Cirwlate
Cmt Vol to
Total Annular
no.
(usft)
(usft)
Rate
Press.
Plug
Plug
aumpeb
Bumped
Held
Held
Prior
Surtace
Mud Lost Flow
(gpm)
(psi)
(psi)
(min)
(hr)
(bbl)
(bbl) After
1
RIMA RY CEMENT
9,306.00
12,748.00
Y
v
v
Pumping Schedule
Fluid pumped Volume
Avg.
Max Disp. Slurry Top
Slurry Base
Start Mix Cmt
Start Slurry
Pumping end Start Disp
Foam
Gas Type
Gas Vol
BH circ. Bh static
Pumped
Disp.
Rate TMD
TMD
Pmp
date/time
job
Used
temp. temp.
(bbl)
Rate
(bblimin) (usft)
(usft)
(9d)
bbl/min
Tomb
Casing Test
Shoe Test
Liner Top Test
Test Pressure: 3,500.00 (psi)
FIT/LOT: (Ppg)
Liner Overap: (usft)
Time: 30 (min)
Tool: N
Positive Test: (ppg) Positive Test Tool: N
Cement Found between Shoe and Collar:
N
Open Hole Length: (usft)
Negative Test: (ppg) Negative Test Tool: N
Hours Before Start: (hr)
Time before test: (hr)
Cmt Found on Tool: N
Log/Survey Evaluation
Interpretation Summary
CBL Run: N
Cement Top: 9,306.00 (usft)
Under Pressure: (psi)
How Determined: TOP OF LINER
Bond Quality:
TOC Sufficient: Y
CET Run: N
Job Rating:
Bond Quality:
If Unsuccessful, Detection Indicator:
Temp Survey: N
Remedial Cement Required: N
HIM Prior to Log: (hr)
How Determined:
Printed 11/17/2017 8:32:38AM
P&k [4-(6P,
RD zl10gi30
Regg, James B (DOA)
From: Rig 272 Senior Manager <rig272srmgr@parkerdrilling.com>
Sent: Thursday, October 12, 2017 2:31 PM S (61,013
To: Regg, James B (DOA)
Subject: RE: State Form for Shut-in on PBU-14 16B on 19:45 Hrs on 10/3/2017.
On the 3rd it was not a well control event it was a breathing issue. There was no gas to surface.
CThanA 3oa,
oFatA'i ncA
Cfatket 272 A& o`lana�et
0atAwc -PtIL(Lao
Office - 907-685-4801
rig272srmgr@parkerdrilling.com
From: Regg, James B (DOA) [mailto:jim.regg@alaska.gov]
Sent: Thursday, October 12, 2017 2:16 PM
To: Rig 272 Senior Manager
Subject: RE: State Form for Shut-in on PBU-14 16B on 19:45 Hrs on 10/3/2017.
Not referring to the BOPE test reports, I am referring to the BOPE Use Report for 10/3/17
Jim Regg
Supervisor, Inspections
AOGCC
333 W.7th Ave, Suite 100
Anchorage, AK 99501
907-793-1236
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.
The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,
please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Jim Regg at 907-
793-1236 or lim.regg(@alaska.&ov.
From: Rig 272 Senior Manager[mailto:rie272srmgr@parkerdrillina.com)
Sent: Thursday, October 12, 2017 1:48 PM
To: Regg, James B (DOA) <iim.reee@alaska.aov>; AADU Tech Limit Engineer
<AADUTechLimitEngineerPparkerdrillin> com>; akd&chseinfo@bp.com; akdcrie272wellsiteleader(@bp.com; DOA
AOGCC Prudhoe Bay <doa.aogcc.prudhoe.bav alaska.gov>; Casanova, Luis <Luis.Casanova Pparkerdrill ing.com>;
Brooks, Phoebe L (DOA) <phoebe.brooks( alaska.eov>
Subject: RE: State Form for Shut-in on PBU-14 16B on 19:45 Hrs on 10/3/2017.
These are the last to Reports for DS14-16B
(;TlLanA YOa,
oPatAnclL
oPatket 272 Cft 01ana.qez
C?atket ,,,DtXinq
office - 907-685-4807
rig2 72srmgr@parkerdrilling.com
From: Regg, James B (DOA) [mailto:jim.reggColalaska.gov]
Sent: Thursday, October 12, 2017 12:18 PM
To: Rig 272 Senior Manager; AADU Tech Limit Engineer; akd&chseinfo(abl).com; akdcrio272wellsiteleader(&bp com; DOA
AOGCC Prudhoe Bay; Casanova, Luis; Brooks, Phoebe L (DOA)
Subject: RE: State Form for Shut-in on PBU-14 16B on 19:45 Hrs on 10/3/2017.
Looks like there should have been a 20d report for use of BOPE on 10/3/17. Only notice received was for BOPE use on
9/30/17 (received 10/1/17)
Jim Regg
Supervisor, Inspections
AOGCC
333 W.71h Ave, Suite 100
Anchorage, AK 99501
907-793-1236
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCQ, State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.
The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,
please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Jim Regg at 907-
793-1236 or iim.reggOalaska.zov.
From: Rig 272 Senior Manager[mailto:rig272srmgr@parkerdrilling.com)
Sent: Friday, October 6, 2017 3:52 AM
To: AADU Tech Limit Engineer<AADUTechLim itEngineer@parkerdrillina.com>; akd&chseinfo@bp.com;
akdcrig272wellsiteleader@bp.com; DOA AOGCC Prudhoe Bay<doa.aoacc.prudhoe. bav@a]aska.eov>; Casanova, Luis
<Luis.Casanova@parkerdrilling.com>; Regg, James B (DOA) <iim.reee@alaska.gov>; Brooks, Phoebe L (DOA)
<Phoebe.brooks@alaska.gov>
Subject: State Form for Shut-in on PBU-14 16B on 19:45 Hrs on 10/3/2017.
State Form for Shut-in on PBU-1416B on 19:45 Hrs. on 10/3/2017.
"Re -Test on Annular & HCR Valves"
DARRELL MASSIE
Parker Drilling Company
Parker Drilling Alaska Services, LTD
Jr. Rig Manager Rig 272
Alternate: Jon King
(907) 685-4801 work
(907) 715-6086 cell
darrell.massiena parkerdrilling.com
I r
crz1U 'T'VIA ,: Orin vtvtaWo +�
NOTICE BY Parker Drilling Company
This message, as well as any attached document, contains information from Parker Drilling Company that is confidential
and/or privileged. The information is intended only for the use of the addressee named above.
If you are not the intended recipient, you are hereby notified that any use, disclosure, copying, distribution or the taking
of any action in reliance on the contents of this message or its attachments is strictly prohibited, and may be unlawful. If
you have received this message in error, please delete all electronic copies of this message and its attachments, if any,
destroy any hard copies you may have created, without disclosing the contents, and notify the sender immediately.
Unless expressly stated otherwise, nothing contained in this message should be construed as a digital or electronic
signature, nor is it intended to reflect an intention to make an agreement by electronic means.
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
'All BOPE reports are due to the agency within 5 days of testing'
Submit to: Lm regg(cilalaskagow AOGCC InSPectors(cDalaska goy: Phoebe brooks( alaska goy
Contractor:
Parker
Size/Type
Rig No.: 272
DATE:
10/5/17
Pit Level Indicators
Rig Rep.:
Patrick Lynch
I
Rig Phone: 907-685-4801
P
#1 Rams
1
Operator:
B. P.
#2 Rams
Op. Phone: 907-685-4802
Blind / Shear
NT
#3 Rams
Rep.:
Blair Newfeld
NT
E -Mail rig272srmgrat7.parkerdrilling.com
0
Well Name:
PBU 14 16B
#5 Rams
PTD # 2170930
Sundry #
NA
#6 Rams
0
Operation:
Drilling: X
1
Workover:
Explor.:
HCR Valves
2
Test:
Initial:
Kill Line Valves
Weekly:
Bi -Weekly:
X
Check Valve
st Pressure (psi):
Rams: 250/3500
Annular: 250/3500
Valves:
250/3500 MASP:
2379
MISC. INSPECTIONS:
TEST DATA
FLOOR SAFETY VALVES:
Test Result
Test Result
Quantity
Test Result
Location Gen.
NT
Well Sign
NT
Upper Kelly
1
NT
Housekeeping
NT
Rig
NT
Lower Kelly
1
NT
PTD On Location
NT
Hazard Sec.
NT
Ball Type
4
NT
ling Order Posted
NT
Misc.
NA
Inside BOP
2
NT
FSV Misc
0
NA
BOP STACK:
Quantity
Size/Type
Test Result
Stripper
0
Pit Level Indicators
NA
Annular Preventer
I
13-5/8"
P
#1 Rams
1
7"
P
#2 Rams
I
Blind / Shear
NT
#3 Rams
1
2-7/8" X 5"
NT
#4 Rams
0
NA
#5 Rams
0
NA
#6 Rams
0
NA
Choke Ln. Valves
1
3-1/8"
NT
HCR Valves
2
3-1/8"
P
Kill Line Valves
2
2-1/16", 3-1/8"
NT
Check Valve
0
NA
BOP Misc
0
NA
MUD SYSTEM:
Visual
Alarm
Trip Tank
NT
NT
Pit Level Indicators
NT
NT
Flow Indicator
NT
NT
Meth Gas Detector
NT
NT
H2S Gas Detector
NT
NT
MS Misc
0
NA
Quantity Test Result
Inside Reel valves
ACCUMULATOR SYSTEM:
Time/Pressure
System Pressure (psi)
CHOKE MANIFOLD: Pressure After Closure (psi)
Quantity Test Result 200 psi Attained (sec)
No. Valves 15 P Full Pressure Attained (sec)
Manual Chokes 1 P Blind Switch Covers:
Hydraulic Chokes I P Nitgn. Bottles # & psi (Avg.):
CH Misc 0 NA ACC Misc
Test Results
Number of Failures: 0 Test Time: 1.6 Hours
Repair or replacement of equipment will be made within NA days.
Notifv the AOGCC of repairs with written confirmation to: AOGCC.Insi
Remarks: The test was conducted with A 4" test joint, The test was conducted on the Annular &
14 16B on 19:45 Hrs on 10/3/2017. All shut-in components were tested successfully.
24 hr Notice Yes Date/Time
rest Start Date/Time: 10/5/2017
(date)
rest Finish Date/Time: 10/5/2017
By
(time) I Witness
Test Result
NT
NT
on
Form 10-424 (Revised 03/2017) 2017-1005 BOP Parker272 test -after -use PBU 14-16B
l f6kA, 14-r�,8
Pm 2,I1tfy3o
Regg, James B (DOA)
From: Murphy, Jay <Jay.Murphy@bp.com>
Sent: Sunday, October 1, 2017 1:58 PM
To: DOA AOGCC Prudhoe Bay 1�
Cc: Klein, Anchala; Romo, Louis A; Cismoski, Doug A; Isaacson, William S; Schiavenato,
Carlos F; Seymour, Len I; Allen, Kenneth W; Egbejimba, Uchenna J; Daniel, Ryan; Kilfoyle,
Jeffery A
Subject: AOGCC BOPE Usage Form
Attachments: Parker 272 BOPE Usage Form 14-16B. 9-30-17.docx
Thank You,
Jay Murphy
GWO-Alaska
Senior Well Site Leader
Office: (907) 659-4618
Cell: (907) 715-9211
Harmony: 2156
Alternate: Greg Sarber
AOGCC BOPE USAGE REPORT FORM (Well Control event only)
Field Superintendent Name:Wellsite
Jay Murphy
Leader Name:
Dave Newlon /Brett Anderson
Contact Number: 907-659-4618
Contact Number: 907-685-4802
BP IRIS Number: 275174
Rig Name & Well Pad or Drill Site & Well Name:
GPB Drill Site 14 Well 16B ✓ P Z-7 2_
Permit To Drill (PTD) Number: 217-093
Date and Time of Incident: 19:45 9/30/2017
Original Scope of Work:
Drilling Intermediate Hole -
Operational Description Leading up to Well Control Event:
Drilling ahead at 7380'md (6718'tvd) flow checked well. Observed gas breaking out in bell nipple and flow from well.
BOPE Used and Reason:
Shut Annular Preventer, opened HCR Choke to closed Choke Manifold to prevent influx.
Prepare to circulate wellbore through the choke and MGS.
Current BOPE test time/date: 9/25/17
Is a BOPE re -test required after use: Yes
BOPE Retest time/date and result (WSL to complete as applicable):
Plan Forward:
Continue to drill to interval TD. Plan to re -test annular preventer and valves after POOH. Forecast looking like it will be
On the 3rd of October 2017'.
Additional Comments:
Well Control issues resolved.
ACTIONS REQUIRED:
1) Well Site Leader: Timely email notification of BOPE re -test time estimate to AOGCC North Slope
Inspectors is required following any WC incident to allow the State to witness re -test as required. (This is a
judgment call given WC is an unplanned event during rig operations and factors such as wellbore condition
and trip timing will influence timing of any retest)
2) Superintendents: Email the completed BOPE Usage Report form to AOGCC North Slope Inspectors within
24 hours of a WC incident: doa.aogcc.prudhoe.bay@alaska.gov
3) Well Site Leader: Complete AOGCC BOPE Test report form 10-424 and send to three AOGCC addresses
(noted in form) within 5 days following the test/retest. This is applicable to Well Control events Only.
P7-0 -� /7 -693
Loepp, Victoria T (DOA)
From: Sperry, Nathan <Nathan.Sperry@bp.com>
Sent: Wednesday, September 27, 2017 9:28 AM
To: Loepp, Victoria T (DOA)
Cc: Lastufka, Joseph N
Subject: RE: PBU 14-16B (PTD 217-093) Changes to PTD
Attachments: 14-16B Ops Summary Ver 3.docx
Follow Up Flag: Follow up
Flag Status: Flagged
Good morning Victoria,
Thank you for your response.
I've updated the Proposed Drilling Operation in the attached Ops Summary. The red text indicates the
changes. Strikethrough indicates the step has been removed. Red text without strikethrough indicates the step has
been added.
Regards,
Nathan Sperry
Drilling Engineer
C: (907) 268-8416
0:(907)564-4258
From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.gov)
Sent: Wednesday, September 27, 2017 8:52 AM
To: Sperry, Nathan <Nathan.Sperry@bp.com>
Subject: RE: PBU 14-16B (PTD 217-093) Changes to PTD
Nathan,
The modifications as outlined below are approved. Please include this approval with the approved PTD. Please send an
updated procedure.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Vlctorla.LoeppBalaska oov
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska 42
From: Sperry, Nathan [mailto:Nathan.SperrvC@bp.com]
Sent: Tuesday, September 26, 2017 2:55 PM
To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.eov>
Cc: Lastufka, Joseph N <Joseph.Lastufka@bo.com>
Subject: RE: PBU 14-16B (PTD 217-093) Changes to PTD
Hi Victoria,
Thanks for taking our call today.
We originally planned to pump 244 sx of Class G cement in our 8-1/2" x 7" annulus. We are planning to underream the
intermediate hole to 9-7/8". As a result of the increased hole size, the cement volume has increased to 90.8 bbls, 508
cu ft, 438 sacks of 15.8ppg class G.
The directional targets have not changed. We updated the directional plan to WP09 to account for the results of the
gyro surveys. I've attached the updated directional plan with the anticollision scan.
Please let me know if you need any additional information.
Regards,
Nathan Sperry
Drilling Engineer
C: (907) 268-8416
0:(907)564-4258
From: Sperry, Nathan
Sent: Tuesday, September 19, 2017 2:51 PM
To:'Loepp, Victoria T(DOA)' <victoria.loepp@alaska.eov>
Cc: Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Subject: RE: PBU 14-16B (PTD 217-093) Changes to PTD
Hi Victoria,
I'm writing to follow up on my previous e-mail. Have you had a chance to review the proposed changes listed in the e-
mail below?
Thank you,
Nathan Sperry
Drilling Engineer
C: (907) 268-8416
0:(907)564-4258
From: Sperry, Nathan
Sent: Monday, September 11, 2017 4:52 PM
To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>
Cc: Lastufka, Joseph N <Joseph.Lastufka @bp.com>
Subject: PBU 14-16B (PTD 217-093) Changes to PTD
Hi Victoria,
We have made a few changes to our planned 14-16B sidetrack since the well was permitted.
1. The offset gyros were run, as per the a -mail chain below, and the anticollision passes major risk.
2. We are planning to underream the intermediate hole to 9-7/8". As a result, the cement volume has changed to
90.8 bbls, 508 cu ft, 438 sacks of 15.8ppg class G.
3. We have changed our decomplete. We are not planning to perform a 9-5/8" shallow cut and pull. We are
planning to run the 7' casing to surface and we will land it in the existing tubing spool. We will add a new tubing
spool for our 4-1/2" tubing. We made this change because of the risks associated with a shallow cut and pull.
Please let me know if you need any additional information.
Also, please let me know if you approve these proposed changes.
Regards,
Nathan Sperry
Drilling Engineer
C:(907)268-8416
O: (907) 564-4258
From: Loepp, Victoria T (DOA)[mailto:victoria.loepp@alaska.gov]
Sent: Monday, July 17, 2017 10:37 AM
To: Sperry, Nathan <Nathan.Sperry@bp.com>
Subject: RE: PBU 14-16B(PTD 217-093) Anti -collision
Nathan,
When will these gyros be run and the results available?
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria. LoeoorrDalaska. aov
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or VIC3ona.Loepp@a1oska.00v
From: Sperry, Nathan [mailto:Nathan.Sperry@bp.com]
Sent: Monday, July 10, 2017 4:32 PM
To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>
Subject: RE: PBU 14-16B(PTD 217-093) Anti -collision
Hi Victoria,
We plan to run a gyro in each offset well in order to reduce the positional uncertainty of the wells. Once we have the
gyro results, we will re -calculate the anticollision to see if it passes.
If the AC does not pass after the gyro's, the following will apply:
14-01 (and sidetrack) — Will have a plug set below the potential collision depth. This well is an operable injector that is
online.
14-03 (and sidetrack) - Will have a plug set below the potential collision depth. This well is a non-operable producer that
is shut-in.
14-05A—This well passes major risk.
14-12 - Will be shut in at surface and a collision in the reservoir will not pose an HSSE risk. This well is operable but is
currently shut-in.
14-15 — Will have a plug set below the potential collision depth. This well is an operable producer that is online.
Please let me know if you need any additional information.
Regards,
Nathan Sperry
Drilling Engineer
C: (907) 268-8416
O: (907) 564-4258
From: Loepp, Victoria T (DOA) [mailto:victoria.loepo @alaska.gov]
Sent: Friday, July 7, 2017 10:55 AM
To: Sperry, Nathan <Nathan.Sperry@bp com>
Subject: PBU 14-16B(PTD 217-093) Anti -collision
Nathan,
PBU 14-01, 14-01A, 14-03, 14-03A, 14-05A, 14-15 are minor risked. Please outline their status how they will be secured
to mitigate risk.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria. Loepp(a)alaska.gov
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are on unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at 19071793-1247 or _Victoria.I oeolaska.ao_v
14-16B Operations Summary
Current Well Status:
4/23/2016 MIT -OA PASS to 1200
4/23/2016 MIT -IA Pass to 3500
4/17/2016 PPPOT-IC PASS to 3500psi (all LDS cycled)
4/17/2016 PPPOT-T Pass to 5000psi (all LDS cycled)
Previous Cementing Work:
13-3/8" Cement Job (1981)
Casing landed at 2601, Stab in job. Pump 70bb1 lignosulfonate spacer, 2600sxs fondu mixed at 11.7-
12ppg, 400sx Arctic Set mixed at 15.2ppg. Did get cement returns to surface, drilled hard cement in
shoe track, and LOT to 12.5ppg.
9-5/8" Cement Job (1981):
Landed Casing at 9384'MD. Pumped 102bb1 Class G cement, no indication of losses. TOC estimate
with 40% washout is 8078' and 7556' with gauge hole. Good casing test, drilled cement with no u -
tube and LOT to 12.5ppg
7" Liner Job (1981):
RIH with liner to 10180. TOL at 9085'MD. Pump 400sx 15.8ppg Class G. Floats held, release from
hanger. Circ DP and pump pill. RIH with 6" bit and casing scraper. Tag Cement at 8740' indicating
returns off the top of liner. Drill firm cement all the way through 9100' and on to 9146. Stringer were
cleaned out from 9842 to 10005'MD. Drill casing collar and cleanout cement to 10125'PBTD Test
casing and run CBL "acceptable bond" in reports.
OA Freeze Protect (3/19/82):
Downsqueeze 300Sxs Arctic set 1 followed by 131bbls Arctic Pack down 13-318" x 9-5/8" Annulus.
Estimated TOC based on displacement with Arctic Pack = 2255" MD
Current Wellhead Configuration:
See last page
Pre -Rig Work:
1
F
Injectivty Test.
2
F
Fullbore P&A. Planned Toc at —8000'.
3
S
D&T. Pull GLV from Sta 5.
4
F
A/SL: MIT -T. MIT -IA. MIT -OA
5
F
Circ Cement Plug. Place TOC in TBG and IA at 7500' MD.
6
S
D&T. Drift for jet cut. MTT log.
7
F
MIT -T. MIT -IA
8
E
Jet cut TBG at —3200' MD PER ODE
9
F
CMIT-TxlA to 3500 psi.
10
W
PPPOT-T and IC. Function LDS.
11
O
Cement Control Lines
12
0
PT Control Lines
Proposed Drilling Operations
1. MIRU Parker 272.
2. Test TWC from above and below to 3,500 psi for 5 minutes each.
3. Nipple down tree. Nipple up BOPE and test to 3,500 psi. (Configured from top to bottom: annular
preventer, 2-7/8" x 5" VBR, blind/shear, mud cross, 2-7/8" x 5" VBR).
4. Pull TWC with lubricator.
5. RU hard lines to BOP. Circulate out diesel freeze protection and displace well to clean seawater.
6. Pull 5-1/2" x 4-1/2" tubing from the pre -rig cut.
A. DreSS Gasing GUt ARd cap With shallow sapping tool
a - %-te-�SP-c41-)-
11. PU and RIH with 9-5/8" Smith whipstock assembly and 8.5" window milling assembly. RIH to the
top of the tubing stub. Orient and set the whipstock. Shear off the whipstock.
12. Displace the well to -9 7 1 O Opp,, LSND based milling fluid prior to 9-5/8" casing milling operation.
13. Mill a window in the 9-5/8" casing at -3200' MD'.
14. POOH for drilling BHA.
15. MU an 8-1/2" >::' :"5 Rotary Steerable drilling BHA with DIR/GR/RES/PWD/GR-at-bit. RIH
16. Drill 8-1/2" x - ,` intermediate interval to weight up point above HRZ. Weight up mud to 10.5ppg
(HRZ/Kingak stability).
17. Continue drilling to 7" casing point at the top of the Sag River.
18. Circulate well clean, short trip, run back to TD, circulate wellbore clean. POOH for 7" casing.
19. Run 7", 26#, L-80, Vam-Top HC casing back to surface. Cement 7" casing with 15.8 ppg class G
cement. Displace cement with mud.
20. ND BOP and set 7" slips.
21. NU new tubing spool and test packoffs.
22. Freeze protect the 9-5/8" x 7" annulus.
23. Change out 7" rams to VBR's and test to 250 psi / 3,500 psi.
24. MU a 6-1/8" RSS BHA with DIR/GR/RES/DEN/NEU with a PDC bit and RIH to the 7" landing
collar.
NOTE: may need to run bent motor and insert bit to achieve DLS in plan and land in
sag.
25. Pressure test the casing to 3500 psi.
26. Displace well to the planned 8.6 ppg DIF.
27. Drill out the 7" shoe plus 20' of formation. Pull into the shoe and perform an FIT.
28. Drill the 6-%" production build and lateral as per directional plan. Circulate well clean, short trip as
needed, and POOH.
29. Run 4-1/2", 12.6# 13Cr VamTop liner to TD.
30. Cement liner to TOL with 15.8 ppg Class G cement. If losses are high, 8.6ppg bi-modal ultra -light
cement may be used.
31. Set liner top packer and hanger.
32. Displace wellbore to clean seawater and circulate excess cement above TOL.
33. POOH and LD liner running tool.
34. Pressure test liner/packer/casing to 3,500 psi for 30 minutes.
35. CONTINGENCY: RU DPC pert guns, RIH, and perforate liner with MaxForce pert guns (base
plan is to perforate post -rig).
36. RU and run 4-1/2", 12.6# 13Cr VamTop completion per the tally. Tag up in PBR, space out, and
land tubing hanger. RILDS.
37_ Perforate 1 200on d,Opipe.
38. Displace tubing and IA to clean seawater.
39. Reverse circulate in heated seawater and inhibited seawater to IA and tubing (surface to surface).
40. Drop ball & rod and set production packer. Individually test tubing and IA to 3,500 psi for 30
minutes each.
41. Shear DCK valve.
42. Reverse circulate in diesel freeze protect down IA using rig's injection pump.
43. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm
well is dead.
44. Install TWC and test from above to 250 psi low / 3,500 psi high for 5 minutes each and below to
250 psi low / 3,500 psi high for 5 minutes each.
45. N/D BOPE. NU adapter flange and double master valves. Test to 5,000 psi with diesel.
46. Ensure Heet is left on top of TWC and only diesel is left in the tree.
47. Install all annulus valves and secure the well.
48. RDMO
Post -Rig Operations
1. Change out dry hole tree for production tree.
2. DSM to pull TWC.
3. MI/RU slick line. Pull TWC, ball and rod, and RHC plug. Pull shear valve and dummy GLVs.
Install GLVs.
5. Flowback/Test.
Obp
North America - ALASKA - BP
Prudhoe Bay
PB DS 14
14-16
Plan 14-16B
Plan: 14-16B wp09
BP Directional Plan Summary Report
30 August, 2017
BATER
a GE company
by
Company:
North America -ALASKA -BP
Project:
Prudhoe Bay
Stte:
PB DS 14
Well:
14-16
Wellbore:
Plan 14168
Design:
14-16B wp09
Project
Prudhoe Bay, PBU, PRUDHOE
Map System:
Alaska NAD27 State Plane Zones
Geo Datum:
NAD27 ` OGP-Usa AK 14267.158641
Map Zone:
NAD27. OGP-Usa AK / Alaska zone 4 [;
am
PB DS 14, TR -10-14
Site Position:
Direction
From:
Map
Position Uncertainty:
0.00 usft
Well
14-16,14-16
Well Position
+N/S 0.00 usft
70°14'26.346 N
+E/ -W 0.00 usft
Position Uncertainty
0.00 usft
0.000 in
Grid Convergence:
INagburs
Plan 14168
Magnetks
Model Name
5,939,293.700 usft
BGGM2017
Design
14158 WPOS
Audit Notes:
148° 36'1.368 W
Sample Date
8/25/2017
Version: Phase:
Vertical Section: Depth From (TVD)
(usft)
47.09
BP
BP Directional Plan Summary Report
Northing:
Seeding:
Slot Radius
Northing:
Easting:
Wellhead Elevation:
Declination
(°1
1772
PROTOTYPE
+N/ -S
(usft)
0.00
Local Coordinate Reference:
TVD Reference:
MO Reference:
North Reference:
Survey Calculation Method:
Database:
Well 14-16
14-16B Plan @ 89.25us11 (ngx)
14-168 Plan @ 89.25usft(rigx)
True
Minimum Curvature
EDM RSK -Alaska PROD -ANCP1
BAKER
JUGHES
E company
System Datum:
Mean Sea Level
+E/ -W
Direction
Using Well Reference Point
(I
0.00
Using geodetic scale factor
5,939,577.430 usft
Latitude:
70°14'26.346 N
674,150.480 usft
Longitude:
148° 35'36.726 W
0.000 in
Grid Convergence:
1.32 °
5,939,293.700 usft
Latitude:
70° 14'23.277 N
675,373.690 usft
Longitude:
148° 36'1.368 W
42.16 usft
Ground Level:
42.10 usft
Dip Angle
1°)
Field Strength
(nn
80.95 57,490
Tle On Depth:
3,116.25
+E/ -W
Direction
(usft)
(I
0.00
110.00
81301201710:51:35AM Page 2 COMPASS 5000.1 Build 81D
t by
Company:
North America -ALASKA -BP
Project:
Prudhoe Bay
Site:
PB DS 14
Well:
14-16
Wellbore:
Plan UAW
Design:
14.188 wp09
Suety Tool Program
Date 8/30/2017
From
To
(w(q
(usfq Survey (wentione)
118.25
3,118.25 Gyrodata Gryo (14-16)
3,118.25
3,200.00 14-16B wp09 (Plan 14-168)
3,200.00
3,800.00 14-168 wp09 (Plan 14-16B)
3,800.00
9,487.00 14.168 wp09 (Plan 14-168)
3,800.00
9,487.00 14.168 wp09 (Plan 14.188)
9,487.00
10,700.00 14-16B wp09 (Plan 14-166)
9,487.00
10,700.00 14-168 wp09 (Plan 14-168)
10,700.00
12,761.70 14-168 wp09 (Plan 14-168)
10,700.00
12,761.98 14-188 wp09 (Plan 14.168)
W01201710:51:354M
BP
BP Directional Plan Summary Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Tool Name DeseripSon
GYD-CT-CMS
Gyrodata cont.casing Ms
Planned Survey
Gyrodata cont easing We
MD
Inc
(wit)
( )
3,118.25
11.14
TIP
MWD -Standard
3,200.00
12.27
KOP-9618"
MWD - Standard
3,217.00
12.44
Start 20.00 hold
at 3217.00 MD
3,237.00
12.44
Start DLS 2.50 TFO 270.80
3,255.08
12.44
SV3
0.00
3,300.00
12.53
3,400.00
13.08
3,465.38
13.67
SV2
70.25
3,500.00
14.04
3,600.00
15.35
3,700.00
16.93
W01201710:51:354M
BP
BP Directional Plan Summary Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Tool Name DeseripSon
GYD-CT-CMS
Gyrodata cont.casing Ms
GYD-0T-CMS
Gyrodata cont easing We
BLIND
Blind drilling
MWD
MWD - Standard
MWD+IFR+MS-WOCA
MWD + IFR +Mufti Station W/O Crustal
MWD
MWD -Standard
MWD+IFR+MS-WOCA
MWD + IFR + Mufti Station W/O Crustal
MWD
MWD - Standard
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W10 Crustal
Well 14-16
14-168 Plan ® 89.25usft (rigx)
14.168 Plan @ 89.25usft (ngx)
True
Minimum Curvature
EDM R5K -Alaska PROD - ANCP1
Azi (azimuth)
TVD
TVDSS
N/S
EIW
Northing
Easting
DLeg
(°)
lush)
(us8)
(uaft)
(usft)
(wN)
("Off)
675,437.606
(wloouse)
43.46
3,115.41
3,026.16
16.43
33.69
5,939,310.911
675,406.985
5,939,376.614
0.00
44.67
3,195.46
3,106.21
28.34
46.23
5,939,323.086
675,418.243
70.25
1.41
35.16
3,212.07
3,122.82
31.12
47.55
5,939,325.920
675,420.502
114.81
12.00
35.16
3,231.60
3,142.35
34.65
50.03
5,939,329.496
875,422.899
3,591.41
0.00
33.05
3,249.25
3,160.00
37.87
52.22
5,939,332.772
675,425.007
2.50
BAER
Fyq, E
CEwmpany
TFace
(°)
0.00
12.85
-90.00
0.00
-90.00
27.88
3,293.11
3,203.86
46.24
57.13
5,939,341.249
675,429.730
2.50
-87.95
16.85
3,390.64
3,301.39
66.66
65.49
5,939,361.858
675,437.606
2.50
-82.90
10.25
3,454.25
3,365.00
81.34
69.01
5,939,376.614
675,440.782
2.50
-72.14
7.00
3,487.86
3,398.61
89.53
70.25
5,939,394.833
675,441.831
2.50
-65.72
358.59
3,584.60
3,495.35
114.81
71.40
5,939,410.132
875,442.395
2.60
-62.56
361.59
3,680.66
3,591.41
142.45
68.94
5,939,437.705
675,439.298
2.50
-54.43
Page 3
COMPASS 5000.1 Build 81D
1
" by
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PS DS 14
Well:
14-16
Wellbore:
Plan 14.166
Design:
14-16B wp09
Planned Survey
Well 14-16
MD Inc
14-168 Plan (d) 89.25usft (ngx)
("ft) (')
14-168 Plan ® 89.25usft (rigx)
3,800.00
18.70
3,837.00
19.39
Start DLS 2.60 TFO 90.00
EOM R5K-Alaska PROD -ANCP1
3,856.51
19.40
SV1
(usfq
3,900.00
19.45
4,000.00
19.80
4,100.00
20.44
4,200.00
21.34
4,300.00
22.47
4,337.00
22.94
Start DLS 3.00 TFO.24A2
4,400.00
24.57
4,500.00
27.46
4,526.06
28.20
UG4
5,939,479.076
4,600.00
30.29
4,700.00
33.15
4,730.53
34.02
UG3
190.30
4,800.00
36.02
4,900.00
38.92
5,000.00
41.82
5,100.00
44.74
5,200.00
47.66
5,239.80
48.83
Start 681.32 hold at 5239.80 MD
5,300.00
48.83
BP
BP Directional Plan Summary Report BAKER
a �,r Pavy
Local Co-ordinate Reference:
Well 14-16
TVD Reference:
14-168 Plan (d) 89.25usft (ngx)
MD Reference:
14-168 Plan ® 89.25usft (rigx)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EOM R5K-Alaska PROD -ANCP1
AN (azimuth)
TND
TVDSS
381.71
NIS
E/W
Northing
Beating
Usti
Tiraes
1°)
(Mf)
(Usft)
84.68
(Mfq
(usfq
(wft)
(usft)
(°110oMf)
(•)
345.82
3,775.87
3,686.52
5,939,731.689
172.39
62.89
5,939,467.500
675,432.546
2.50
47.70
343.94
3,810.85
3,721.60
675,457.581
184.05
59.73
5,939,479.076
675,429.123
2.50
42.20
345.41
3,629.25
3,740.00
3.00
190.30
58.02
5,939,485.282
675,427.267
2.50
90.00
348.68
3,870.27
3,781.02
-17.14
204.39
54.78
5,939,499.294
675,423.699
2.50
88.61
356.05
3,964.47
3,875.22
6.65
237.62
50.35
5,939,532.410
675,418.491
2.50
85.54
3.09
4,058.38
3,969.13
4,836.68
271.95
50.12
5,939,566.729
675,417.467
2.50
78.59
9.63
4,151.82
4,062.57
4,820.23
307.33
54.10
5,939,602.185
675,420.627
2.50
71.98
15.61
4,244.61
4,155.36
844.28
343.68
62.29
5,939,638.711
675,427.967
2.50
66,86
17.67
4,278.75
4,189.50
140.10
357.36
68.3(1
5,939,652.482
675,431.740
2.50
60.32
15.80
4,336.39
4,247.14
381.71
73.69
5,939,676.998
675,438.480
3.00
-24.42
13.29
4,428.21
4,336.95
424.25
84.68
5,939,719.775
675,448.474
3.00
-22.71
12.71
4,449.25
4,360.00
436.10
87.42
5,939,731.689
675,460.934
3.00
-20.45
11.21
4,513.78
4,424.51
471.44
94.89
5,939,767.189
675,457.581
3.00
-19.94
9.46
4,598.82
4,509.57
523.16
104.29
5,939,819.109
675,465.775
3.00
-18.63
8.98
4,624.25
4,535.00
539.83
106.99
5,939,836.834
675,468.091
3,00
-17.14
7.96
4,681.14
4,591.89
579.26
112.86
5,939,875.393
675,473.034
3.00
-16.74
6.65
4,760.50
4,671.25
639.60
120.57
5,939,935.886
675,479.338
3.00
-15.90
5.50
4,836.68
4,747.43
704.00
127.40
5,940,000.424
675,484,670
3.00
-14.86
4.47
4,909.48
4,820.23
772.29
133.33
5,940,068.B29
675,489.015
3.00
-13.98
3.54
4,978,68
4,889.43
844.28
138.36
5,940,140.913
675,492.361
3.00
-13.24
3.19
5,005.19
4,915.94
873.92
140.10
5,940,170.580
675,493,413
3.00
-12.59
3.19
5,044.82
4,955.57
919.16
142.62
5,940,215.870
675,494.883
0.00
n nn
8/302017 10:51:35AM Page 4 COMPASS 5000.1 Build 81D
bBP
p
BP Directional Plan Summary
Report
BA ER
BAT U GIHES
mmp �y
Corrlpany: North America-ALASKA-BP
Local Coordinate Reference:
Well 14-16
Project: Prudhoe Bay
TVD Reference:
14-16B Plan ® 89.25usft (riga)
Site: PB DS 14
MD Reference:
14-168 Plan C 89.25usft
(ngx)
Well: 14-16
North Reference:
True
Wellbore: Plan 14-168
Survey Calculation Method:
Minimum Curvature
Deign: 14-168 wp09
Database:
EDM R5K-Alaska PROD - ANCP1
Planned Survey
AAD Inc
A d (azi nuth)
TVD
TVDSS
NIS
ElW
Northing
EaeBng
DLeg
TFace
(Yep ( I
11
(Mft)
(will)
(oan)
(MR)
("to
(USM
(011001
(ry
5,400.00
48.83
3.19
5,110.65
5,021.40
994.32
146.81
5,940,291.099
675,497.325
0.00
0.00
5,500.00
48.83
3.19
5,176.48
5,087.23
1,069.47
151.00
5,940,366.328
675,499.767
0.00
0.00
5,600.00
48.83
3.19
5,242.32
5,153.07
1,144.63
155.20
5,940,441.557
675,502.209
0.00
0.00
5,602.94
48.83
3.19
5,244.25
5,155.00
1,146.84
155.32
5,940,443.765
675,502.280
0.00
0.00
UG1
5,700.00
48.83
3.19
5,308.15
5,218.90
1,219.79
159.39
5,940,516.786
675,504.650
0.00
0.00
5,800.00
48.83
3.19
5,373.98
5,284.73
1,294.94
163.58
5,940,592.015
675,507.092
0.00
0.00
5,900.00
48.83
3.19
5,439.81
5,350.56
1,370.10
187.77
5,940,667.243
675,509.534
0.00
0.00
5,921.12
48.83
3.19
5,453.72
5,364.47
1,385.97
168.65
5,940,683.129
675,510.050
0.00
0.00
Start DLS 3.00 TFO 174.82
6,000.00
46.47
3.49
5,506.85
5,417.60
1,444.17
172.05
5,940,741.383
875,512.018
3.00
174.82
6,100.00
43.49
3.90
5,577.58
5,488.33
1,514.70
176.59
5,940,811.995
675,514.989
3.00
174.62
8,200.00
40.50
4.35
5,651.90
5,562.65
1,581.42
181.39
5,940,878.807
675,518.237
3.00
174.33
6,248.60
39.05
4.59
5,669.25
5,600.00
1,612.42
183.82
5,940,909.853
675,519.939
3.00
173.99
WS2
6,300.00
37.52
4.87
5,729.59
5,640.34
1,644.15
186.44
5,940,941.638
675,521.824
3.00
173.81
6,400,00
34.54
5.46
5,810.46
5,721.21
1,702.73
191.72
5,941,000.315
675,525.740
3.00
173.59
6,500.00
31.56
6.14
5,894.27
5,805.02
1,756.98
197.22
5,941,054.678
675,529.974
3.00
173.11
6,588.83
28.98
6.84
5,969.25
5,880.00
1,800.47
202.16
5,941,098.264
675,533.899
3.00
172.54
WS1
6,600.00
21.59
6.96
5,980.79
5,691.54
1,806.76
202.92
5,941,104.576
675,534.515
3.00
171.94
6,700.00
25.62
7.94
6,069.80
5,980.55
1,851.94
208.81
5,041,149.874
675,539.349
3.00
171.83
6,800.00
22.67
8.17
6,161.04
6,071.79
1,892.38
214.86
5,941,190.447
675,544.464
3.00
170.96
6,606.89
22.40
9.29
6,169.25
6,080.00
1,895.75
215.41
5,941,193.819
675,544.932
3.00
169.84
CM3
6,900.00
19.72
10.73
6,254.27
6,165.02
1,927.99
221.08
5,941,226.184
675,549.846
3.00
169.73
7,000.00
16.79
12.82
6,349.23
6,259.98
1,958.65
227.43
5,941,256.987
675,555.480
3.00
168.38
7,100.00
13.89
15.76
6,445.66
6,356.41
1,984.30
233.89
5,941,282.772
675,561.350
3.00
186.39
8/302017 10:51:35AM
Page 5
COMPASS 5000.1 Build 81D
by
Company: North America -ALASKA -BP
Project: Prudhoe Bay
She: PB DS 14
Well: 14-16
Wellbore: Plan 14-180
Design: 14-168 Wp09
Ptamrtl Survey
TVD
MD
Inc
(usR)
rl
7,200.00
11.05
7,300.00
8.31
7,400.00
5.83
7,403.17
5.76
CM2
(usm
7,500.00
4.12
7,600.00
4.23
7,700.00
6.07
7,800.00
8.58
7,900.00
11.34
8,000.00
14.19
8,024.76
14.91
CM1
247.12
8,100.00
17.09
8,200.00
20.02
8,300.00
22.97
8,400.00
25.93
8,500.00
28.90
8,505.79
29.07
THRZ
42.22
8,537.14
30.00
Start 960.00 hold at $537.14 MD
8,600.00
30.00
8,700.00
30.00
8,707.72
30.00
LCUITKNG
7,270.00
8,800.00
30.00
8,900.00
30.00
BP
BP Directional Plan Summary Report
Local Coordinate, Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 14-16
14-168 Plan @ 89.25usft (dgx)
14-16B Plan 0 89.25usft (rigx)
True
Minimum Curvature
EDM R5K -Alaska PROD - ANCP1
BAKER
JUGHES
Ewmpany
Azl (azimuth)
TVD
TVDSS
NIS
EAV
Northing
Eastarg
DLsg
TFace
(%
(Will
(usR)
(ustq
(unit)
(usR)
(usm
(°MB(lueR)
(%
20.20
6,543.29
6,454.04
2,004.85
240.47
5,941,303.468
675,567.441
3.00
163.56
27.58
6,641.86
6,552.61
2,020.25
247.12
5,941,319.018
675,573.735
3.00
158.23
41.59
6,741.10
6,651.85
2,030.46
253.84
5,941,329.380
675,580.216
3.00
151.95
42.22
6,744.25
6,655.00
2,030.70
254.05
5,941,329.623
675,580.424
3.00
138.04
70.72
6,840.73
6,751.48
2,035.45
260.61
5,941,334.525
675,586.866
3.00
137.41
112.81
6,940.49
6,851.24
2,035.20
267.41
5,941,334.439
675,593.666
3.00
109.01
139.92
7,040.10
6,950.85
2,029.73
274.21
5,941,329.123
675,600.598
3.00
67.03
152.95
7,138.28
7,050.03
2,019.03
281.01
5,941,318.590
675,607.643
3.00
40.01
159.91
7,237.77
7,148.52
2,003.15
287.78
5,941,302.871
675,614.782
3.00
27.09
164.15
7,335.29
7,246.04
1,982.12
294.51
5,941,282.007
675,621.994
3.00
20.23
164.95
7,359.25
7,270.00
1,975.13
296.16
5,941,276.054
675,623.789
3.00
16.10
166.98
7,431.58
7,342.33
1,956.01
301.17
5,941,256.057
675,629.261
3.00
15.32
189.00
7,526.37
7,437.12
1,924.88
307.75
5,941,225.090
675,836.562
3.00
13.37
170.53
7,619.40
7,530.15
1,888.82
314.23
5,941,189.193
675,643.877
3.00
11.45
171.72
7,710.42
7,621.17
1,847.93
320.59
5,941,148.463
675,651.187
3.00
10.03
172.69
7,799.19
7,709.94
1,802.32
326.81
5,941,103.013
675,658.470
3.00
8.94
172.74
7,804.25
7,715.00
1,799.53
327.17
5,941,100.239
675,658.891
3.00
8,09
173.00
7,831.53
7,742.28
1,784.20
329.09
5,941,084.955
675,661.165
3.00
8.04
173.00
7,885.96
7,796.71
1,753.00
332.92
5,941,053.856
675,665.720
0.00
0.00
173.00
7,972.57
7,883.32
1,703.38
339.01
5,941,004.389
675,672.966
0.00
0.00
173.00
7,979.25
7,890.00
1,699.55
339.48
5,941,000.572
675,673.525
0.00
0.00
173.00
8,059.17
7,969.92
1,653.75
345.10
5,940,954.921
675,680.211
0.00
0.00
173.00
8,145.77
8,056.52
1,604.12
351.20
5,940,905.452
675,687.457
0.00
0.00
8/302017 10.51:35AM Page 6 COMPASS 5000.1 Build 81D
1
Planned Survey
BP
z'110#0) bp
BP Directional Plan Summary Report
BAKER
GHES
Mb
Inc
Azl(azimuth)
A CA company
Company:
North America-ALASKA-BP
Local Coordinate Reference:
Well 14-16
Ending
Project:
Prudhoe Bay
TVD Reference:
14-16B Plan @ 89.25usft (rigx)
(°)
Site:
PS DS 14
MD Reference:
14-16B Plan @ 89.25usft (ri9x)
(unit)
Well:
14-16
Norm Reference:
True
30.00
Wellbore:
Plan 14-16B
Survey Calculation Method:
Minimum Curvature
357.29
Design:
14-16B wp09
Database:
EDM R5K-Alaska PROD -ANCPI
9,100.00
Planned Survey
Mb
Inc
Azl(azimuth)
TVD
TVDSS
NIS
E/W
Northing
Ending
OLeg
TFace
(unit)
r)
(°)
(MR)
("ft)
(nsR)
(usft)
(unit)
(-it)
(°MOOuatq
(°)
9,000.00
30.00
173.00
8,232.37
8,143.12
1,554.49
357.29
5,940,855.983
675,694.703
0.00
0.00
9,100.00
30.00
173.00
8,318.98
8,229.73
1,504.87
363.38
5,940,806.514
675,701.949
0.00
0.00
9,200.00
30.00
173.00
8,405.58
8,316.33
1,455.24
369.48
5,940,757.045
675,708.194
0.00
0,00
9,273.52
30.00
173.00
8,469.25
8,380.00
1,418.75
373.96
6,940,720.675
675,714.522
0.00
0.00
TJB
9,300.00
30.00
173.00
8,492.18
8,402.93
1,405.61
375.57
5,940,707,576
675,716.440
0.00
0.00
9,386.68
30.00
173.00
8,567.26
8,478.00
1,362.59
380.85
5,940,664.896
675,722.721
0.00
0.00
TJA
9,400.00
30.00
173.00
8,578.78
8,469.53
1,355.98
381.67
5,940,656.107
675,723.686
0.00
0.00
9,487.14
30.00
173.00
8,654.25
8,565.00
1,312.74
386.98
5,940,615.000
675,730.000
0.00
0.00
Start 26.00 hold at 9487.14 MD - TSGR .7-
9,500.00
30.00
173.00
8,666.39
8,576.14
1,306.36
387.76
5,940,608.638
675,730.932
0.00
0.00
9.512.14
30.00
173.00
8,675.90
8,586.65
1,300.33
388.50
5,940,602.633
675,731.811
0.00
0.00
Start Build 6.00
9,518.33
30.37
173.00
8,681.25
8,592.00
1,297.24
388.88
5,940,599.554
675,732.262
6.00
0.00
TSHU
9,600.00
35.27
173.00
8,749.86
8,660.61
1,253.32
394.27
5,940,555.770
675,738.676
6.00
0.00
9,610.31
35.89
173.00
8,758.25
8,669.00
1,247.36
395.00
5,940,549.833
675,739.545
6.00
0.00
TSAD
9,618.98
36.41
173.00
8,765.25
8,676.00
1,242.29
395.63
5,940,544.774
675,740.266
6.00
0.00
Start Build 12.00
9,700.00
46.13
173.00
8,826.07
8,736.82
1,189.31
402.13
5,940,491.962
675,748.021
12.00
0.00
9,800.00
58.13
173.00
8,887.34
8,798.09
1,111.10
411.73
5,940,414.000
675,759.441
12.00
0.00
9,900.00
70.13
173.00
8,930.89
8,841.64
1,021.95
422.68
5,940,325.138
675,772.457
12.00
0.00
10,000.00
82.13
173.00
8,954.81
8,865.56
925.76
434.49
5,940,229.259
675,786.500
12.00
0.00
10,100.00
94.13
173.00
8,958.07
8,868.82
826.74
446.85
5,940,130.555
675,800.957
12.00
0.00
10,200.00
106.13
173.00
8,940.51
8,851.26
729.21
458.62
5,940,033.338
675,815.197
12.00
0.00
8/302017 10:51:35AM Page 7 COMPASS 5000.1 Build 81D
1
Planned Survey
MD Inc
BF
AN(azfrnuth)
TVD
by
BP Directional Plan Summary Report
EIW
BATER
UGHES
Easting
DL.eg
Wass
GE company
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well 14-16
(daft)
Pre)eot: Prudhoe Bay
TVD Reference:
14-168 Plan @ 89.25usft (rigx)
(ueR)
SRO: PB DS 14
MD Reference:
14-16B Plan @ 89.25usft (rigx)
114.41
Wen: 14-16
North Reference:
True
665.04
Wellbore: Plan 14-168
Survey Calculation Method:
Minimum Curvature
12.00
Design: 14-16B wp09
Database:
EDM RSK - Alaska PROD - ANCP1
Planned Survey
MD Inc
AN(azfrnuth)
TVD
TVDSS
Nf8
EIW
Worthing
Easting
DL.eg
Wass
1M11) r)
P)
IusM
(daft)
(watt)
lusts)
lusft)
(ueR)
(1100ustq
(•)
10,268.98
114.41
173.00
8,916.63
8,827.38
665.04
466.50
5,939,969.372
675,824.566
12.00
0.00
Start 160.00 hold at 10268.98 MD
10,300.00
114.41
173.00
8,903.81
8,814.56
637.01
469.94
5,939,941.426
675,828.659
0.00
0.00
10,400.00
114.41
173.00
8,862.48
8,773.23
546.63
481,04
5,839,851.333
675,841.856
0.00
0.00
10,428.98
114.41
173.00
8,850.50
8,761.25
520.43
484.26
5,939,825.222
675,845.680
0.00
0.00
Start OLS 7.00 TFO.107.32
10,500.00
112.84
167.85
8,822.02
8,732.77
456.31
495.09
5,939,761.371
675,858.003
7.00
-107.32
10,600.00
110.37
180.81
8,785.16
8,695.91
366.88
520.23
5,939,572.560
675,885.215
7.00
-109.38
10,700.00
107.62
154.00
8,752.59
8,663.34
279.68
556.58
5,939,586.228
675,923.580
7.00
-111.98
10,800.00
104.64
147.40
8,724.78
8,635.53
195.99
603.60
5,939,503.662
675,972.527
7.00
-114.20
10,900.00
101.49
140.96
8,702.15
8,612.90
117.07
660.58
5,939,426.093
676,031.325
7.00
-116.04
11,000.00
98.20
134.71
8,685.04
8,595.79
44.09
726.68
5,939,354.676
676,099.099
7.00
-117.49
11,100.00
94.81
128.55
8,673.70
8,584.45
-21.86
800,91
5,939,290.477
676,174.837
7.00
-118.56
11,200.00
91.37
122.44
8,666.31
8,579.06
.79.79
882.16
5,939,234.453
676,257.412
7.00
-119.26
11,248.00
89.71
119.52
8,667.86
8,578.61
-104.49
923.30
5,939,210.717
676,299.114
7.00
-118.59
Start 240.86 hold at 11248.00 MD
11,300.00
89.71
119.52
8,668.13
8,578.88
-130.12
988.56
5,939,186.155
676,344.947
0.00
0.00
11,400.00
89.71
119.52
8,666.64
8,579.39
-179.39
1,055.57
5,939,138.923
676,433.081
0.00
0.00
11,488.86
89.71
119.52
8,669.10
8,579.85
-223.17
1,132.90
5,939,096.953
676,511.396
0.00
0.00
Start OLS 6.00 TFO.84.39
11,500.00
89.76
118.97
8,669.15
8,579.90
-228.62
1,142.62
5,939,091.739
676,521.240
5.00
-84.39
11,548.87
90.00
116.53
8,669.25
6,580.00
-251.37
1,185.86
5,939,070.000
676,565.000
5.00
.84.39
Start DLS 5.00 TFO 0.00
11,559.13
90.51
116.53
8,669.20
8,579.95
-255.95
1,195.04
5,939,065.633
676,574.280
5.00
0.00
Start 663.46 hold at 11569.13 MD
11,600.00
90.51
116.53
8,668.84
8,579.59
-274.21
1,231.60
5,939,048.231
676,611.280
0.00
0.00
11,700.00
90.51
116.53
8,667.94
8,578.69
-318.88
1,321.07
5,939,005.655
676,701.732
0.00
0.00
11,800.00
90.51
116.53
8,667.05
8,577.80
-363.55
1,410.53
5,938,963.080
676,792.204
0.00
0.00
wj3 du7f 1u:b1:3bAM Page 6 COMPASS 5000.1 Build 81D
Planned Survey
BP
b
1"
y
BP Directional Plan Summary Report
BAKER
UGHES
a�r:oroa�y
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well 14-16
TVD
Project: Prudhoe Bay
TVD Reference:
14-1613 Plan ® 89.25usft (dgz)
Northing
Site: PB DS 14
MD Reference:
14-168 Plan (M 89.25usft (ngz)
Veee
Well: 14-16
North Reference:
True
(ac n)
Wellbore: Plan 14-158
Survey Calculation Method:
Minimum Curvature
(uen)
Design: 14-16B Wp09
Database:
EDM R5K-Alaska PROD -ANCP1
r)
Planned Survey
No Int
AN (Mhnuth)
TVD
TVDSS
N13
EAV
Northing
Eas6ng
OL"
Veee
(Mfg (1)
r)
(ac n)
(oan)
(uefq
(wR)
(uen)
(u,1t)
Cnoowtp
r)
11,900.00
90.51
116.53
6,666.15
8,576.90
408.22
1,499.99
5,938,920.505
676,882.677
0.00
0.00
12,000.00
90.51
116.53
8,665.26
8,576.01
-452.89
1,588.46
5,938,877.930
676,973.149
0.00
0.00
12,100.00
90.51
116.53
8,654.36
8,575.11
497.57
1,678.92
5,938,835.355
677,063.622
0.00
0.00
12,112.58
90.51
116.53
8,664.25
8,575.00
-503.18
1,690.17
5,938,830.000
677,075.000
0.00
0.00
Start DLS 440 TFO.123.13
12,162.14
89.43
114.87
8,664.28
8,575.03
-524.68
1,734.83
5,938,809.549
677,120.145
4.00
-123.13
Start 69944 hob at 12162.14 MD
12,200.00
89.43
114.87
8,664.65
8,575.40
-540.60
1,769.18
5,938,794.431
677,154.847
0.00
0.00
12,300.00
89.43
114.87
8,865.65
8,576.40
-582.66
1,859.90
5,938,754.495
677,246.514
0.00
0,00
12,400.00
89.43
114.87
8,666.64
8,577.39
-624.72
1,950.61
5,938,714.560
677,338.181
0.00
0.00
12,500.00
89,43
114.87
8,667.64
8,578.39
-686.78
2,041.33
5,938,674.624
677,429.848
0.00
0.00
12,600.00
89.43
114.87
8,668.64
8,579.39
-708.84
2,132.05
5,938,634.689
677,521.515
0.00
0.00
12,700.00
89.43
114.87
8,669.63
8,580.38
-750.90
2,222.77
5,938,594.753
677,613.182
0.00
0.00
12,761.98
89.43
114.87
6,670.25
8,581.00
-776.97
2,279.00
5,938,570.001
677,669.998
0.00
0.00
TD at 12761.96 .41112'
4,rol.Ma 4,01U.20 4112"
3,200.00 3,195.46 95W
9,487.14 8,654.25 7"
9.625 12.250
7.000 8.500
8/302017 10:51:35AM Page 9 COMPASS 5000.1 Build 81D
1
by
BP
BP Directional Plan Summary Report
Company:
North America - ALASKA - BP
Project;
Prudhoe Bay
Local Coordinate Reference:
Well 14-16
PB DS 14
NSiteD Reference:
14-16B Plan @ 89.25usft (rigx)
Well
Well:
14-16
MD Reference:
14-168 Plan @ 89.25usft (rigx)
Wellbore:
Plan 14-168
North Reference:
True
Design:
14188 wp09
Survey Calculation Method:
Minimum Curvature
Database:
EDM RSK -Alaska PROD -ANCP1
Formations
Measured
Vertloal
Depth
Depth
Dip
(wit)
(URM
Dip Direction
Name
Lithalogy
8,707.72
7,979.25
LCU/TKNG
2,709.32
2,709.25
SW
5,602.94
5,244.25
UG1
3,856.51
3,829.25
SV7
6,586.83
5,969.25
WS1
7,403.17
6,744.25
CM2
8,024.76
7,359.25
CM1
9,518.33
8,681.25
TSHU
6,808.89
6,169.25
CM3
3,255.08
3,249.25
SVA
8,505.79
7,804.25
THRZ
9,273.52
8,469.25
TJB
8,487.14
8,854.25
TSGR
4,730.53
4,624.25
UG3
9,386.68
8,567.25
TJA
9,810.31
8,758.25
TSAD
3,465.38
3,454.25
SV2
4,526.06
4,449.25
UG4
6,248.60
5,689.25
WS2
BAKER 10
gUGHES
GL
8/302017 10:51:35AM Page 10 COMPASS 5000.1 Build 81D
byBP Directional Plan Summary Report B'F UGHES
ear cemmpay
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 14
Well:
14-16
Wellbore:
Plan 14-168
Design:
14-166 wp09
Plan Annotations
Measured
Depth
(MR)
3,118.25
3,200.00
3,217.00
3,237.00
3,837.00
4,337.00
5,239.80
5,921.12
8,537.14
9,487.14
9,512.14
9,618.98
10,288.98
10,428.98
11,248.00
11,488.86
11,548.87
11,559.13
12,112.58
12,162.14
12,761.98
Vertical
Depth
(MR)
3,115.41
3,195.46
3,212.07
3,231.60
3,810.85
4,278.75
5,005.19
5,453.72
7,831.53
8,654.25
8,675.90
8,765.25
8,916.63
8,850.50
8,667.86
8,669.10
8,669.25
8,669.20
8,664.25
8,664.26
8,670.25
Local Coordinates
-NI-S
+FJ -W
(usft)
(usft)
16.43
33.69
28.34
45.23
31.12
47.55
34.65
50.03
184.05
59.73
357.36
66.38
873.92
140.10
1,385.97
168.65
1,784.20
329.09
1,312.74
386.98
1,300.33
388.50
1,242.29
395.63
665.04
466.50
520.43
484.26
-104.48
923.30
-223.17
1,132.90
-251.37
1,185.86
-255.95
1,195.04
-503.18
1,690.17
-524.68
1,734.83
-776.97
2,279.00
Comment
TIP
KOP
Start 20.00 hob at 3217.00 MO
Start DLS 2.50 TFO 270.00
Start DLS 2.50 TFO 90.00
Start DLS 3.00 TFO -24.42
Start 681.32 hold at 5239.80 MD
Start DLS 3.00 TFO 174.82
Start 950.00 hold at 8537.14 MD
Start 25.00 hold at 9487.14 MD
Start Build 6.00
Start Build 12.00
Start 160.00 hold at 10268.98 MD
Start DLS 7.00 TFO -107.32
Start 240.86 hold at 11248.00 MO
Start DLS 5.00 TFO -84.39
Start DLS 5.00 TFO 0.00
Start 553.45 hold at 11659.13 MD
Start DLS 4.00 TFO -123.13
Start 599.84 hold at 12162.14 MD
TD at 12761.98
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 14-16
14-16B Plan @ 89.25usft (dgx)
14-16B Plan @ 89.25usft (rigx)
True
Minimum Curvature
EDM R5K-Alaska PROD -ANCP1
&30/2017 10:51:35AM Page 11 COMPASS 5000.1 Build 81D
North America - ALASKA - BP
Prudhoe Bay
PB DS 14
14-16
Plan 14-16B
14-16B wp09
Anticollision Summary Report
30 August, 2017
BA ER
I IGHES
BAT
GE company
BP BAER
by Anticollision Report F�UGHEs
Company:
North America -ALASKA -BP
Project:
Prudhoe Bay
Reference Site:
PB DS 14
Site Error
O.00usft
Reference Well:
14-16
Well Error:
O.00uaft
Reference Wellbore
Plan 14-16B
Reference Design:
14-168 wp09
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errom are at
Database:
Offset TVD Reference:
Wall 14-16
14-166 Plan C 89.25usft (rigx)
14-IOB Plan @ 89.25usft (rigx)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
14-16Bwp09
Froin
Filter type:
NO GLOBAL FILTER: Using user defined selection 8 filtering criteria
WARNING: There is hidden tight data in this project
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
3,000.00 to 12,761.98usft Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum cerrlercenter distance of 1,471.49usft Error Surface:
Elliptical Conic
Survey Tool Program
Data 8/30/2017
Froin
To
(uslt)
(waft) Survey (Wellborn)
118.25
3,118.25 Gyrodata Gryo (14-16)
3,118.25
3,200.00 14-168 wp09 (Plan 14-16B)
3,200.00
3,800.00 14-186 wp09 (Plan 14-16B)
3,800.00
9,487.00 14-16B wp09 (Plan 14-18B)
3,800.00
9,487.00 14-16B wpD9 (Plan 14-16B)
9,487.00
10,700.00 14-16B wp09 (Plan 14-16B)
9,487.00
10,700.00 14-16B wp09 (Plan 14-16B)
10,700.00
12,761.70 14.166 wp09 (Plan 14-168)
10,700.00
12,761.98 14-16B wp09 (Plan 14-168)
Tool Name Description
GYD-CT-CMS
Gyrodata cont.casing mls
GYD-CT-CMS
Gyrodata cont.casing nVs
BLIND
Blind drilling
MWD
MWD- Standard
MWD+IFR+MS-MCA
MWD + IFR +Mufti Station W/O Crustal
MWD
MWD -Standard
MWD+IFR+MS-WDCA
MWD + IFR + MUPo Station W/O Crustal
MWD
MWD - Standartl
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
8/302017 11:07.44AM Page 2 of 4 COMPASS 5000.1 Build BID
wood BP
by Anticollision Report B F UECtR
�E�am�M
Company:
North America -ALASKA -8P
Local Coordinate Reference:
Well 14-16
Project:
Prudhoe Bay
ND Reference:
14-168 Plan @ 89.25usft (rigx)
Reference Site:
PB DS 14
MD Reference:
14168 Plan @ 89.25usft (ngx)
Site Error:
0.00usft
North Reference:
True
Reference Well:
14-16
Survey Calculation Method:
Minimum Curvature
Well Error:
0 00usft
Output errors are at
1.00 sigma
Reference Wellbore
Plan 14-16B
Database:
EDM RSK-Alaska PROD -ANCP1
Reference Design:
14-16B wp09
Offset ND Reference:
Offset Datum
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
PB DS 14
14-01 -1401 -14-01
3,012.24
3,050.00
323.33
40.42
283.59
Pass - Major Risk
14,01 -14 -01A -1401A
3,018.36
3,050.00
325.12
40.49
285.32
Pass - Major Risk
14-02 - 14-02 -14-02
3,ODO.00
3,025.00
276.62
39.41
237.31
Pass - Major Risk
14 -02 -14 -02A -14-02A
3,004.30
3,025.00
277.02
39.44
237.68
Pass - Major Risk
14 -02 -14 -02B -14-02B
3,004.30
3,025.00
277-02
39.44
237.68
Pass- Major Risk
14-02 - 14.02C - 14-02C
3,002.48
3,025.00
276.86
39.43
237.54
Pass - Major Risk
14-02 - 14-02CL1 - 14-02CL1
3,002.48
3,025.00
276.86
39.32
237.65
Pass- Major Risk
14-03-14-03-14-03
3,235.44
3,300.00
92.51
44.27
48.28
Pass - Major Risk
14 -03 -14 -03A -14-03A
3,235.44
3,300.00
92.51
44.27
48.28
Pass - Major Risk
14-04 - 14-04 - 14-04
3,013.23
3,100.00
277.97
60.65
219.05
Pass - Major Risk
14 -04 -14 -04A -14-04A
3,013.23
3,100.00
277.97
60.65
219.05
Pass - Major Risk
1405 -1405 -14-05
3,015.64
3,075.00
590.40
36.53
553.89
Pass - Major Risk
14 -05 -14 -05A -14-05A
3,015.84
3,075.00
590.40
36.53
553.89
Pass - Major Risk
1412 -1412 -14-12
12,800.28
9,175.00
291.91
197.67
105.50
Pass - Major Risk
1413 -1413 -14-13
3,011.15
3,025.00
373.88
41.35
332.88
Pass - Major Risk
1414 -1414 -14-14
3,011.52
3,025.00
370.10
63.92
311.08
Pass - Major Risk
1415 - 1415 - 14-15
3,012.54
3,000.00
84.18
40.53
43.65
Pass - Major Risk
1416 -1416 -14-16
3,442.11
3,425.00
15.61
0.00
15.61
Pass - NOERRORS
1416 -14-16A- 14-16A
3,442.11
3,425.00
15.61
0.00
15.61
Pass - NOERRORS
1416-14-16AP81 - 1416APB1
3,442.11
3,425.00
15.61
0.00
15.61
Pass - NOERRORS
14-20 -14.20 - 14-20
8,824.88
8,825.00
710.93
437.28
273.70
Pass - Major Risk
14-28-14-288 - 14-28B
11,214.98
9,075.00
734.67
123.05
614.30
Pass - Major Risk
1429 -1429 -14-29
12,178.97
9,075.00
958.68
282.46
677.72
Pass - Major Risk
14-31 -14-31 - 14-31
6,475.DO
5,775.00
813.73
269.57
681.31
Pass - Major Risk
1435 -14-35 -1435
4,992.33
4,800.00
268.50
110.18
160.33
Pass - Major Risk
14-41 .1441 -1441
5,997.97
5,500.00
385.82
127.88
258.05
Pass - Major Risk
14-43 -1443 -14-43
5,353.73
5,050.00
301.26
113.13
188.25
Pass - Major Risk
Plan 14 -45 -Plan 14-45-14-45 wp05
3,009.55
3,325.00
1,303.64
44.62
1,261.90
Pass - Major Risk
8/30/2017 11:0744AM Page 3 of 4 COMPASS 5000.1 Build 81O
by
Company:
North America -ALASKA - BP
Project
Prudhoe Bay
Reference SKe:
PB DS 14
Site Error.
0oousft
Reference Well:
14-16
Well Error.
0 o0usft
Reference Wellbore
Plan 14-16B
Reference Design:
14-168 wp09
BP
Anticollision Report
Local Coon inate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output emons are at
Database:
Offset TVD Reference:
Well 14-16
14-16B Plan @ 89.25usft (ngx)
14-166 Plan @ 89.25usft (ngx)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
BFURtq
Reference Depths are relative to 14-16B Plan @ 89.25usft (ngx) Coordinates are relative to: 14-16
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 `OGP-Usa AK
Central Meridian is 150° 0'0.000 W' Grid Convergence at Surface is: 1.33"
1600-
1200-
0
600-
1200-O
2
V
0
-0
d 400-
0
Ladder Plot
I
I
I
/
I
1
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I I
I I
I I
1
- I
1 I
1 I
11.
I'
I I
1 I
I
I I
C
I
I
I
I I
it
I
I
I I
I
I
I
I I
I I
I
I
1
I I
1
I
1 I 1 1
2500 5000 7500 10000 12500 15000
Measured Depth (2500 usftfin)
$ 14-01,14-01, 14-01 V1
$ 14-01,14-01A, 14-01AV1
-Ar 14-02,14-02,14-02 V6
$ 14 02,14-02A, 14-02A V4
43- 14-02,14-026,144026 V3
-(- 14-02,14-02C, 14-02CV28
♦- 14-02,14.02CL1, 14-02CL1 VO
$ 14-03,14-03,14-03 V1
43- 14-04,14-04A, 14-04A V3
$ 14-05,14-05,14-05 V1
$- 14 -05,14 -05A,14 -05A V1
-W 14-12,14-12,14-12V1
-!- 14-13,14-13,14-13 V1
-� 14-14,14-14,14-14V2
-�- 14-15,14-15,14-15V1
$ 14-16,14-16,14-16V1
$ 14-20,14-20,14-20 V1
',- 14-28,14-28B, 14-28BVO
-A- 14-29,14-29,14-29 V1
--Ie�--- 14-31,14-31,14-31 V1
-+- 14-35,14-35,14-05 V1
$ 14-41,1441,1441 V1
-)E- 14-43,14-43,1443 V1
$ Plan 1445, Plan 1445,1445wp05Vo
8/30/2017 11:07:44AM Page 4 of 4 COMPASS 5000.1 Build 81D
1�4h�Mltleo60y �TM�n. 9YE1180RE DETAILS: PMn 14168 IIHEAMIIHONNTb!
Mr: Iwmu r...r.a.I auenl VAp6oro: 1816 cwrr04s7wrw: wal4-IF.Tn.re,
036! 1Nt T/p a.M.na.llsm MD: 311636 v'�flvullbleienm. taMJMOb aum(1¢4
W6lwe 2916+114403 �] GiMr. bvbi9Riflrarta 0a-rymxa.a40
I PYn:1NO3vg0311N4?Yn1N101 yJ tes�tmml InwueetrMnMaa' S41a61M0865wAMw1
cr66..I4xr Iusrnawr.
N UDETPILS'. WO
&N
I I IIMq
ITJM Z , KOP
S DLD%TV0270.W
vn 95M. 5150 SIm DLS250TFOWW
a5�111'" --S.MS]OOTFO.2442
IGS
N�
SEC110MOETA68
'�
968 MO Ir0 A33 TO
.WS
4F3 -W
Dkg
TFan VEW T09M
1 3110.2511.14 4146 3115.41
16.43U69
4!03
0.00
an) 03.04
2 MOD 1227 40.61 3196A6
WI
4521
1.41
1Z% 328t
3 32t7.W 120 35.1fi 331207
31.12
47.5
12AG
MAO 30.04
4 3237.03 1244 3516 3211.6D
34.%
50.03
D.W
OZ 35.16
5 3W..W 59.39 30.96 3810.85
184.05
).T3
250
Tram 403
6 43R.W 73594 17.67 42MM
357.36
66.38
ZW
WAO 4984
7 SE&W 4683 3.19 50%.19
673%2
10.10
30.0
.24a 467.25
6 5821.12 4663 3.19 5153.72
13%.97
I%
am
am 315%
9 897.14 Win 17503 7831M
IMM
32903
303
174.02 100.9
10 9187.14 WW MW B%A25
131Z74
386.98
ON
02 6.35 WOT.W1.6
11 9512.14 KOO MW 867503
IMM
33SM
aW
0.03 - 67
12 031898 M41 IMM M25
1262.29
39&63
60.0
OX 4112
13 IO26S98 114.41 IMM 891663
4'30.1
49855)
1203
O.W 210.91
14 0126.%114.41 Inn BOMW
Sa40
0.00
aW 97.06
15 11248W 89.71 119.52 WA
-109.0
93330
7.W
407.33 M36
16 1148&86 M71 119M MID
30.17
113203
OAO
Om Im..W
17 t151&87 9800 116M MZ
-251.37
1185.86
50.0
41335 1290.32 1a160Tb9N3.6
18 11559.13 90.51 316.53 BEHI.29
-2%96
11%0.4
5.03
0.03 1210.51
19 12I1Z58 W.51 1t6.53 8854E
63.18
IMM
GAO
OW 170334 14168T.*4.6
W /218314 W.0 114.87 885428
6N.%
151.83
4.03
-123.13 1809.66
21 1963.% 29A3 114.87 86n25
-71b.W
299W
OW
0..00 207.30 1416BTb98166
I I IIMq
ITJM Z , KOP
S DLD%TV0270.W
vn 95M. 5150 SIm DLS250TFOWW
a5�111'" --S.MS]OOTFO.2442
IGS
N�
ryryUl S.DL33Wr' 40.2
'�
65WBwN6,W
CM2
Ill 10.1G9tv8n 16'
31x.49 3an.W Ess
mv.x 6407.+4 r
6N 3 DLV.WTPO-I
MI
I'KHG
F Sun.uiW 1290 Y1
- a
4!03
raelrmDEMn6
'�
rw W
66.
c
31x.49 3an.W Ess
mv.x 6407.+4 r
"mv
IM6ei6.x+n6+.m
4trs
4!03
�ER d$
I UGN6
StmDL55WTFOOW
S.DL55(.o6-8439 &.DLS4WTF0-123.13
14-I66T4,46 TD!@76198 -
6 1I T qB T. 136 1416..... $6
_/ L 412'
4% 603 150 903 1050 12M 1350 1500 1650
Vertical Section at 110.000 (1501I9f /in)
no W AnMMm
3115AI 311825 W
31MAe 320080 KOP
32120.7 3217-00 SM4Ahcke132174OW
3231&1 UPM SMDLS2.)TF0270.W
3810.65 363700 SWOM2.50TFOWW
4279,75 433700 SMDLS3.WTF0.24.42
W(5.19 5'b90) 8WRI.VI4J&5239ZW
6453.72 5931.12 SWM30TF0174M
783153 %37.14 Sbn%O.W MMN%37.1403
8%625 9497.14 3bn2500hWW9497.14MD
Ons) 951214 SbrtBuiM6.W
876535 961899 $bIRWIM
016.631016899 8W160.WMMYIR68MW
885050 042988 SMDLS7AOTF0-10782
%67-06112490.0 &a1240A6WdWI12QXW
8669.10 11499.96 SMDL55WTF041.39
%0351154887 8MDL65AOTFOOAO
NEM 115F9.13 SWSMAShWWII 59.130
866425 W12.SB SMOL54AOTF0413.13
866.2812IM14 SM59M!vkJW2162.14W
99702512 ON TU1276196
6L0VF'PI6J(90M
DM1WI60339 WW Vdr& Yr Vv n
MND
MMD4F0.�MSNOfA
&0.D
WFLL DEO.: 1N4
ommau.r: i
rfB
eW8 eEY/ MVMpr 9eW ImYEe xWBr. Bp
W BM N}pl.3p BIrAMO ]Y L'}i.iirN tr'Y'I.MBW
1N5
`-------- 14-03/14-03114-03
30D
2]0
240
Azimuth from North [°
WAVVEV MOUR M
30
I _ - sa14-16B wp09
80 3000.00 To 4000.00
40
20
_- --�11'8 --V616il
k60
16/14-16APB
Dm:M`N`3 MW rIlol. Yx 14n1rn'.
Dool From
Pmjecl: Plutlhw BBY
N1TfCDLL6pN 6ETIMC'B
j
b
T{M6
8Xe PB 0814
C. 300000To 25.00
MFFrom W00A0
MDepthRan,
DYD.CT.DM6
3M0.00
M00.00 10.18Bxy0B=141°81
ebwp : Phn W6B
LPI.-W-
M.14W-.ft1=e(1416IPrn10.t6B)
F.,.. cmAea ey veno -...r. :14'1,0
Balemnce. Plein l0.feB¢p0Y1f4161PMniMBB)
WFLL DEO.: 1N4
ommau.r: i
rfB
eW8 eEY/ MVMpr 9eW ImYEe xWBr. Bp
W BM N}pl.3p BIrAMO ]Y L'}i.iirN tr'Y'I.MBW
1N5
`-------- 14-03/14-03114-03
30D
2]0
240
Azimuth from North [°
WAVVEV MOUR M
30
I _ - sa14-16B wp09
80 3000.00 To 4000.00
40
20
_- --�11'8 --V616il
k60
16/14-16APB
w�ia W°�uem wa
BA ER
F�UGHES
Dm:M`N`3 MW rIlol. Yx 14n1rn'.
Dool From
Depth To fiurveyklo
Tool
118.25
311015 Oyoed.01(t4181 GY
T{M6
311825
3M..00 W613"09(PMm441813)
DYD.CT.DM6
3M0.00
M00.00 10.18Bxy0B=141°81
BUN.
3800.00
DN]A. 10.188 wpODIPhn1a188)
MWD
3900.00
019].00 Wall p00�PMn 14180)
MWD.IFReMbWOCP
048].00
10)BO.00 tN8Bxy00(Pln 14188)
MM
8107.00
10]00.00 10.18By0D(PYn t4IDB)
4MN.IFH.M3VgCp
10]W.00
127 0 10.106bpOD(PYn 10.2881
MMp
10700.W
12]8L00 141BBY.p001Phn 1Yt9B1
MA9.IFR.M6 A
w�ia W°�uem wa
BA ER
F�UGHES
14-15/14-15/14-15 330 - --
30
35
30
300ZS 60
14-16/14-16/14-16
20 14-16114-16/14-16A
15 14.16/14-16APgvT4 16APe1
10
14-16B wp09
17 aT6II _.__. X516-3564. �
361z
10
15
20
25
240 1"
30
35
40
210
50
180
Azimuth from North [°] vs Centre to Centre Separation [6 usft/in]
proteru Tw NVS .EW
+ S11 B]! I=.11 41N SIISAI B.r }m
tll!
0.m
lF.p vBvl n"p,
OW
Fmm IXtrx TB MD
.1. I . n Rr1M }!1 WS
ssnm Rr .11 nm
1 =m1
Imxas ro,
m 11m
mlm txM Y.le mlm 336 rm
OW
Om 1119
6 rAm IB.V 31Sm }+015 1M0 m}S
e m]m xv1 men }
m."
xm
xm
Srym 6ID
win a}e
° Itl.•ro
iaM.M
,Ai
bx+1NmW ]IA 1]rm
SWomm
9&1R1.3:1i3i
p.
nln
te]1
w wA
OImO
1`I°BTppala
om
4500
sooD
13 +�e1°n+."li inw 'wax! lemn mW
Rin
�nA
°m "or
M-6000
141. I11A1 Inm eew'rm BIDM rIn
1511 Wm a°it NBl1 Hrm 4m4) mA
O.m
>m
om 3T1M
40]JS WS}
6000
]000
]000
0000
I° IIBW] win ItBA Mr1! dl3] 116H
+e "I ew Berm ural
Sm
>m
b51xmR 1419BlYptlx!
pm Inmlt
6000
D000
M.
ID 1118111 rM Ifln rr10 M 13 M
4AI
4R.IS 1.A IN9B11ga11G
Bill
10000
1+ 1.1. . 111!] }A35 iRn x3Rm
Om
Om SMEI IN881eT159
10000-"11000
000
2000
12080
13000
14-15/14-15/14-15 330 - --
30
35
30
300ZS 60
14-16/14-16/14-16
20 14-16114-16/14-16A
15 14.16/14-16APgvT4 16APe1
10
14-16B wp09
17 aT6II _.__. X516-3564. �
361z
10
15
20
25
240 1"
30
35
40
210
50
180
Azimuth from North [°] vs Centre to Centre Separation [6 usft/in]
PNT .D QNSMRA 6
M ,lNBnMMo4: MD, FYIYek25W
G Renpe Flo. IMM Te 12181.98
R.., li dBy: Gntre DbYWe:leif,4B
ReMenae: Ra¢1418BwpOd 11N81Wnt41BB1
F-- N910ETN8: INB
IYBmles.wk
Y �
Wltl WW yYgyy woo, LLIB IIBlW
Mp BN P M B>YIYw TY"L Tm 1wn.,=W --
60
—too
14-168 wp99 80
4000.00 To 12761.98' - 80
40
20
27 - _ . 4021).. 4123. 429
20
60
14-16114-145'iM 16
60
14-16I14;16o,14-16A
80
100 14-t 6114-16AP B1' 144 6APB 1
120
2 120
140
780
180
200
210 220 160
240
180
Azimuth from North [e] vs Centre to Centre Separation [25 usfUin]
SURVEY MCOR M
0W 2018-03rMTo0:WW WWe44:Yaa VeNrn: I
o.,I, Fmm 0.yM Ta Bu olo- Tool
I
]5 ]11826 OyIodto0. 114-11 OYDCT-0MS
]b 32W.W 10.169w�BIPYn141081 tlYpCTLM6
.00 3800.0014-168 x DD (PMn 14109) NJRo
,00 6481.. t4 -108v (PMn141oe).W WB>.W 14169 xy0B PW 14169) M4D•IFR+M9i AM 07M Do
10.38BKOBIPW 141881 MWD
We7,W 107.00 10.189'"09(PYn 10.768) MJNHFR.MENOCN
10700. 12761.70 10.1 BB wyo61PYn 141681 MWD
10700.. 1276186 14168 w,W(1 n14-188) ~11FR.MGWCCP
Poo
Poo Pl1449
b
PSDB 1t
y
M.mn w TmTm. w0.
Wek /4/i
xx�wer
WBion: PMn%IGB
_.
�� arcloxl]6reas --
PM:1MiBWpMnNt'P W B141iry
PNT .D QNSMRA 6
M ,lNBnMMo4: MD, FYIYek25W
G Renpe Flo. IMM Te 12181.98
R.., li dBy: Gntre DbYWe:leif,4B
ReMenae: Ra¢1418BwpOd 11N81Wnt41BB1
F-- N910ETN8: INB
IYBmles.wk
Y �
Wltl WW yYgyy woo, LLIB IIBlW
Mp BN P M B>YIYw TY"L Tm 1wn.,=W --
60
—too
14-168 wp99 80
4000.00 To 12761.98' - 80
40
20
27 - _ . 4021).. 4123. 429
20
60
14-16114-145'iM 16
60
14-16I14;16o,14-16A
80
100 14-t 6114-16AP B1' 144 6APB 1
120
2 120
140
780
180
200
210 220 160
240
180
Azimuth from North [e] vs Centre to Centre Separation [25 usfUin]
SURVEY MCOR M
0W 2018-03rMTo0:WW WWe44:Yaa VeNrn: I
o.,I, Fmm 0.yM Ta Bu olo- Tool
I
]5 ]11826 OyIodto0. 114-11 OYDCT-0MS
]b 32W.W 10.169w�BIPYn141081 tlYpCTLM6
.00 3800.0014-168 x DD (PMn 14109) NJRo
,00 6481.. t4 -108v (PMn141oe).W WB>.W 14169 xy0B PW 14169) M4D•IFR+M9i AM 07M Do
10.38BKOBIPW 141881 MWD
We7,W 107.00 10.189'"09(PYn 10.768) MJNHFR.MENOCN
10700. 12761.70 10.1 BB wyo61PYn 141681 MWD
10700.. 1276186 14168 w,W(1 n14-188) ~11FR.MGWCCP
%0
40
35
30
300 25 BO
20
5
10
14-16Bwp09 6
270 _ eo
5
10
15
20
240 25 120
30
35
40
210 45 150
So
160
Azimuth from North ['] vs Centre to Centre Separation [8 usfVin]
BAER
UGHES
M.mn w TmTm. w0.
xx�wer
_.
�� arcloxl]6reas --
Ma MC Yc M MI syn
[40 TF VdC mN.,
mue +u4 as msAl
4W JIBSM L4B tl23
Om em MOB
fAi I3ffi B3
From Cg To MOM1
unm x.,e .1. al zS
']+a 1m
rsm POm Lb
ID.Y
a ]w1m 1BA m w}f
wlm 3:44 nal meas X.
no Z3aID
zm mm iu
3118 3B00
YmB am ]eB SBWu mn I.m
]m 4wm
Wo
3600 4W0
t X1.13 wL ].18 5448 130o.130o.IwA6.
B w]11B WID ITim I34ID 3Ub
0.W W JI19
]D] I1B83 dDN
i9 BW14 dm Inm .0 I11�yB w
wlzn4 Wm Inm w�nm + m
D. om n'' lafeemm�le
m om m
V31Mom'°..w. I+w4:, nm wMd +'.4
m.f
5W0—WI)o
M feCBm 1IA41 i]]m w49 1.M YIA
Is +13Mm wll 1189 4dtl BE19
3`2
om mm
]m -la>9 W.m
BWO )Bpo
—'o
+B flwl6 w.n ne9 eew.m .n am
0.W om uam
7000 8000
1. ii®P) W81 ".. BWm EiA
L mBr
6m om 13105 ta+wnlBaly
6M Ialwmryxu
6000 6000
m 77+¢'77 ewi0 iiia Y 11�a1q
xI ON,m ee.o non eBmu �mm zznm
.lO I.
mo -+om tvmID 1NBBLmnse
DOW 1woo
1Dow— 11000
11000 120o0
%0
40
35
30
300 25 BO
20
5
10
14-16Bwp09 6
270 _ eo
5
10
15
20
240 25 120
30
35
40
210 45 150
So
160
Azimuth from North ['] vs Centre to Centre Separation [8 usfVin]
P7 -.D ;� /--093
Loepp, Victoria T (DOA)
From:
Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Sent:
Wednesday, August 16, 2017 4:06 PM
To:
Loepp, Victoria T (DOA)
Subject:
New Parker NOV 6012 BOP Stack
Attachments:
6012 BOP STACK.PDF
Follow Up Flag:
Follow up
Flag Status:
Flagged
Victoria,
Here is the list of Rotary wells that will have the updated BOP stack. If you need any additional information, please don't
hesitate to let me know.
01-35 — PTD #216-021
14-16B — PTD #217-093
L -200A — PTD #216-125
N K -15A — PTD #216-175
Thank you,
Joe Lastufka
Information and Data Controller
Cell: (907) 227-84961 Office: (907) 564-4091
W;
4 A
BP Exploration Alaska1900 E. Benson Blvd.lRoom: 788DIAnchorage, AK
TDP Di MD TAME
gIDI
}1/B' SM MYRYL GTEE VE
} MVM
t/B' MMFlAMIxiD HYD0.11RA; GATE lE VIU
}1/8' SY ttf% ROSE
CfllNt Ao xRll WA dIN1LRR .Tm
ARE FOR REff11QCE DRY B ARE
DEPEICQR Dx D Tofe5
REDIIBEIWIRS
MPPIE tP.
SNM SPDDL
135/r SM itAxfi w
13 5/8• SM LIm= BDITDM
O SPIDER SPDDI
13 5/e• SM fl.1xLS TDP
tJ 5/8' SM fUNCfD BDTfDY
13 5/ STUDDED SM EINAPIER
tJ SNCED WW
nSM w FLANGED BorIDY
GSBIf SPDDI A9'fl6LY
11' SM PLACED roP
11• w F1AlI9ED IIDfIDY
G x A55S y
11• SM FUM IOP
6012 BOP STACK (DRAFT B. 3.17 L. C.)
RDYBDX BELL NPPIE
Dn Wtll
Sz•B8M %PE SVl wEIOFD ro M BDTi11Y W TW itDWBS%
WQx BM TRP M TW BUW SEAL WGi
:
i'r 'S' i
BELL xIPP1E
id• DN i 1B DM IDWER
..... I J_
3. 5/s- Flu OUI1Ef (On DP Z)
na
I
13 S/B• 5M IPIE iIANDE
18' SEAL -1
SFAI-0-GIIM
k) 3-
(t G) 3• DM M. DUREr
q�n
(1 Ew) r oM W. ovnEr
'
_
DIILCM tOd( ooWW FLINSE
s%r�sY
swtvTm txr
1}5/8' 5M $NDBFD TDP
13-5/e• sM eexcm BonoM
13 5/8• SM xD/ 8012 Dg1BLE BDP
13 5/8• SM SNDFD roP
5/8' SM itAIICFD BDRd1
I
w/ }1/2• LLvlI1LL tDCl6 w/ 11- eao51ER
W/
... -
oRcross:
13 5/8' SY
13 5 51TDP
13 5/8' WFlI QED BD
-
I
N
W (Y) 3 1/8' SY 9DE OIIxE15
WL
�
KKl
z-11/1/1 8' 5M Hf6E
2-1/18' SM XB' N}1/DSA
}t/6• w L [µ W
III
FlAIf2D MGxltC w
1 i
PAI 11'PE BDP
13 5/8' SY W W12 A BDP
III
13 5/5• 5M SNDDED TDP
III
13 5/8' SM iLMM BDTIDY
gIDI
}1/B' SM MYRYL GTEE VE
} MVM
t/B' MMFlAMIxiD HYD0.11RA; GATE lE VIU
}1/8' SY ttf% ROSE
CfllNt Ao xRll WA dIN1LRR .Tm
ARE FOR REff11QCE DRY B ARE
DEPEICQR Dx D Tofe5
REDIIBEIWIRS
MPPIE tP.
SNM SPDDL
135/r SM itAxfi w
13 5/8• SM LIm= BDITDM
O SPIDER SPDDI
13 5/e• SM fl.1xLS TDP
tJ 5/8' SM fUNCfD BDTfDY
13 5/ STUDDED SM EINAPIER
tJ SNCED WW
nSM w FLANGED BorIDY
GSBIf SPDDI A9'fl6LY
11' SM PLACED roP
11• w F1AlI9ED IIDfIDY
G x A55S y
11• SM FUM IOP
6012 BOP STACK (DRAFT B. 3.17 L. C.)
pr,9 217-b13
Loepp, Victoria T (DOA)
From: Sperry, Nathan <Nathan.Sperry@bp.com>
Sent: Monday, July 17, 2017 11:07 AM
To: Loepp, Victoria T (DOA)
Cc: Lastufka, Joseph N
Subject: RE: PBU 14-16B(PTD 217-093) Anti -collision
Follow Up Flag: Follow up
Flag Status: Flagged
Good morning Victoria,
The results should be available no later than 1 month from now (hopefully sooner).
Regards,
Nathan Sperry
Drilling Engineer
C: (907) 268-8416
0: (907) 564-4258
From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.gov]
Sent: Monday, July 17, 2017 10:37 AM
To: Sperry, Nathan <Nathan.Sperry@bp.com>
Subject: RE: PBU 14-16B(PTD 217-093) Anti -collision
Nathan,
When will these gyros be run and the results available?
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria Loeop(d)alaska dov
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or Victona.l.oepj aoa aska aov
From: Sperry, Nathan [mailto:Nathan.Sperry@bp.com)
Sent: Monday, July 30, 2017 4:32 PM
To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.eov>
Subject: RE: PBU 14-16B(PTD 217-093) Anti -collision
Hi Victoria,
We plan to run a gyro in each offset well in order to reduce the positional uncertainty of the wells. Once we have the
gyro results, we will re -calculate the anticollision to see if it passes.
If the AC does not pass after the gyro's, the following will apply:
14-01 (and sidetrack) — Will have a plug set below the potential collision depth. This well is an operable injector that is
online.
14-03 (and sidetrack) - Will have a plug set below the potential collision depth. This well is a non-operable producer that
is shut-in.
14-05A—This well passes major risk.
14-12 - Will be shut in at surface and a collision in the reservoir will not pose an HSSE risk. This well is operable but is
currently shut-in.
14-15 — Will have a plug set below the potential collision depth. This well is an operable producer that is online.
Please let me know if you need any additional information
Regards,
Nathan Sperry
Drilling Engineer
C:(907)268-8416
0:(907)564-4258
From: Loepp, Victoria T (DOA) [mailto:victoria.loept)@alaska.gov
Sent: Friday, July 7, 2017 10:55 AM
To: Sperry, Nathan <Nathan.Soerry by com>
Subject: PBU 14-16B(PTD 217-093) Anti -collision
Nathan,
PBU 14-01, 14-01A, 14-03, 14-03A, 14-05A, 14-15 are minor risked. Please outline their status how they will be secured
to mitigate risk.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria LoeooCa)alaska aov
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
THE STATE
°fALASKA
GOVERNOR BILL WALKER
Kenneth Allen
Engineering Team Leader
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 14-16B
BP Exploration (Alaska), Inc.
Permit to Drill Number: 217-093
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Surface Location: 1050' FNL,1093 FEL, Sec. 09, TION, R14E, UM
Bottomhole Location: 1828' FNL, 1184' FWL, Sec. 10, TION, R14E, UM
Dear Mr. Allen:
Enclosed is the approved application for permit to re -drill the above referenced development well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Hollis S. French
Chair
iI-,
DATED this day of July, 2017.
STATE OF ALASKA
ASKA OIL AND GAS CONSERVATION COMM(8(
PERMIT TO DRILL
20 AAC 25.005
r1t4.0t1vtu
JUN 2 12017
1a. Type of Work:
1b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑
to. I sed for:
Drill ❑ Lateral ❑
Stratigraphic Test 11Development - Oil ' Service - Winj ❑ Single Zone 0 •
Coalbed Gas ❑ Gas Hydrates ❑
Redrill 0' Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone 11
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket 0' Single Well ❑
11. Well Name and Number:
BP Exploration (Alaska), Inc
Bond No. 296105380 '
PBU 14.16B -
Address:
3
6. Proposed Depth:
12. FieldlPool(s):
P.O. Box 196612 Anchorage, AK 99519-6612
MD: 12762' • ND: 8670' -
PRUDHOE BAY, PRUDHOE
OIL -
4a. Location of Well (Governmental Section):
7. Property Designation (Lease Number):
ADL 028312
8 DNR Approval Number:
13. Approximate spud dale:
Surface: 1050'FNL, 1093' FEL, Sec. 09. TION, R14E, UM
262' FSL, 704' FEL, Sec. 04, TION, R14E, UM
77-U43
August 15, 2017
Top of Productive Horizon:
9. Acres in Property: 2560
14. Distance to Nearest Property:
1828' FNL, 1184' FWL, Sec. 10, T10N, R14E, UM
Total Depth:
16000
4b, Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL: 89.25' feet
15. Distance to Nearest Well Open
Surface: x- 675374 ' y- 5939294 Zone - ASP 4
GL Elevation above MSL: 42.10' feet
to Same Pool:
5
16. Deviated wells: Kickoff Depth: 3200 - feet
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 114 degrees
Downhole: 3244 Surface: 2379
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casino Weight Grade Couplino Len th
MD I ND Mn I ND (includina since data
8-1/2" 7" 26# L-80 VamTop HC 9490'
Surface Surface 9490' . 8657' 244 sx Class'G'
6-1/8" 4-1/2" 12.6# 13Cr85 VamTo 3420'
9340' 8527' 12760' • 8670' 525 sx Cless'G'
19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth ND (ft):
Plugs (measured):
Effect. Depth MD (ft):
Effect. Depth ND (ft):
Junk (measured):
1
10210 9002
None
10163
8990
9056,9059,9138,9878
Casing Length Size Cement Volume MD ND
Conductor/Structural 80 20" 300 sx Permafrost 29-109 29-109
Surface 2571 13-31V 2600 sx Fondu. 400 sx AS II 29-2600 29-2600
Intermediate 9357 9-518" 500 sx Class'G' 27-9384 27-8635
Liner 393 7" 400 sx Class'G' 9085-9478 8360-8722
Liner 1115 2-7/8" 11 BBIs Class'G' 9085-10200 8360-9000
Perforation Depth MD (ft): 9868-9953 Perforation Depth ND (ft): 8913-8935
Hydraulic Fracture planned? Yes ❑ No 0
20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Spa". Nathan
from without prior written approval.
Contact Email (a�bp.cem
Authorized Name Allen, Kenneth W
907-56 -4258
Authorized Title Engineering Team Lead Contact Phone 907-564-4258
Authorized Signature �^ - Date 6 `a.)
Commission Use Onl
Permit to Drill -7 p,p9
Number: �-� (l f/ G.7
�-(�� ••�o� / v� --.r
�a zlf lJ'fL:Li�}'L/z-��
Permit Approval
Date: '7 _ \e -c —\7
See cover letter for other
requirements:
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed mef ne, gas hydrates, or gas contained in shales:
Other. 2 1 Samples req'd: Yes ❑J No Mud log req'd: Yes ❑/ No 1d
196P7?st 35�r�sf
Yes IY No ❑/ Directional svyreq'd: YeI C� No ❑
H2Smeasures
❑ Yes ❑ No
jC 51 Spacing exception req'd: Yes No Inclination -only svy req'd:
arnor (,� /5 fp be !-<✓i YrNTd a"1d Post initial injection MIT req'd: Yes ❑ No
'
v77!/Rfl�^ a ftr" �Jlci lh/r�td gyros art rvN lo�'�ar {� cl rral�H�
W t}Ol4CGAPPROVED BY
THE COMMISSION Date: Ir PJ'tl
Approved by: COMMISSIONER
�r�1,
iseo 512017 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g))
ORIGINAL "e4�lvl'17
Submit Fann and
Attachments in Duplicate
z; -u- 1-7
by
To: Alaska Oil & Gas Conservation Commission
From: Nathan Sperry, ODE
Date: June 21, 2017
RE: 14-16B Permit to Drill
The 14-16B well is scheduled to be drilled by Parker 272 in August 2017. This sidetrack well is a
horizontal producer targeting the Sag River formation. The planned well is a two -string design using
7" intermediate casing and 4-1/2" production liner. The intermediate casing will be set at the top of the
Sag, and the production interval will be completed with a cemented liner.
The maximurn anticipated surface pressure from the Sag with a full column of gas from TD to surface
is 45i (assumes 7.22 ppg EMW most likely pore pressure and a 0.1 psi/ft gas gradient). The
ell . be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3 rams and an
annular). The BOP rams and annular will be tested to 3,500 psi.
A detailed operations summary is included with the permit application.
If there are any questions concerning information on 14-16B, please do not hesitate to use the contact
information below.
Nathan Sperry Office: (907) 564-4258
Attachments:
Well Bore Schematic
Proposed Pre -Rig Schematic
Proposed Completion
Directional Package
BOPE Schematic
Email: Nathan. SperrvObp.com
As -Staked Survey
Well Head Schematic
Tree Schematic
14-16B PTD 1 6/21/2017
Planned Well Summary
Well 14-16B Well Type Producer Target Sag
Ob'ective
Current Status 14-16A is currently shut-in with a damaged 2-7/8" liner.
Estimated Start Date: 1 8/25/2017
Location
Time to Com tete: 27 Days
FNL / 1093.2' FEL
Planned KOP:
Northing
Easting
TVDss
Offsets
TRS
Tgt
5,940,615
675,730
8,565
262.4' FSL / 703.6' FEL
10N 14E Sec 4
TSGR
Rig: Parker 272
Survey Program:
3,800' MD to TD = MWD+IFR+MS
Nearest Property Line:
—16,000'
Tgt
5,938,570
677,670
8,581
1827'6 FWL 1183'6
10N 14E Sec 10
TD BHL
Planned KOP:
3,200' MD
Planned TD: I
12,762' MD / 8,581' TVDss
Maximum Hole Angle:
•-114° in the production section
None. All offset wells pass BP Anti -Collision Scan Criteria.
Close Approach Wells:
GL -RT:
47.15
HSSE risk.
RTE ref MSL): 1 89.25 '
Rig: Parker 272
Directional — Baker w 06a
KOP: 300' MD
^490 in the intermediate section
Maximum Hole Angle:
•-114° in the production section
None. All offset wells pass BP Anti -Collision Scan Criteria.
Close Approach Wells:
Minor risked wells will be secured such that a collision would not pose an
HSSE risk.
3,200' to 3,800' MD = INC + TREND
Survey Program:
3,800' MD to TD = MWD+IFR+MS
Nearest Property Line:
—16,000'
Nearest Well within Pool:
—285'
14-16B PTD 2 6/21/2017
Formation Tops and Pore Pressure Estimate (SOR)
Form.
Depth
(TVDss)
Pore Pressure
(PP9)
Frac Gradients
(PP9)
SV4
2620
8.50
12.7
KOP
3106
8.50
12.8
SV3
-SV-2
3154
8.50
12.8
3364
8.50
12.8
SV1
3737
8.50
12.9
UG4
4350
9.60
16.1
UG3
4520 1
9.60
16.2
UGI
5150 1
9.60
16.3
WS2
5635 1
8.50
13.2
WS1
5900
8.50
13.2
CM3
6095
9.10
13.5
CM2
-I
6645
9.40
13.8
dM
7240
10.00
14.1
THRZ
7710
10.00
17.0
TKNG
7900
10.00
17.0
TJB
8365
10.10
17.1
TJA
8464
10.10
17.2
TSGR
8551
7.22
12.9
TSHU
8579
7.22
16.3
TSAD
8650
7.31
12.9
q. - - 7, ift
t�;, z-�t. (-7
14-16B PTD 3 6/21/2017
2 q
Casing/Tubing Program
Hole Size
Liner/
Tbg O.D.
WUFt
Grade
Conn
Length
Top
MD / TVDss
Bottom
PV (cp)
lb/ 00ftr
11
API FL
HTHP FL
MBT
pH
3,200' MD -,. , ' MD
MD / TVDss
8-1/2"
7"
26#
L-80
VamTop HC
9,490',
Surface
9,490' / 8,568'
6-1/8"
4'/z'
12.6#
13Cr-85
VamTop
3,420'
9,340'/ 8,438'
12,760'/8,581'
10-15
20- 0
<5
<10
<20
8.5-9.5
(150' lap)
Tubing
4'/"
12.6#
13Cr-85
VamTop
9,345'
Surface
9,345' / 8,442'
(-5' into liner TBS)
Mud Program
Intermediate Mud Pro erties: LSND
Depth Interval
Density
PV (cp)Ib!
p
8-112" Hole Section
Depth I n &-
Density
PV (cp)
lb/ 00ftr
11
API FL
HTHP FL
MBT
pH
3,200' MD -,. , ' MD
9.6 - 9.8
10-15
20-30
<8
NA
<20
8.5-9.5
'MD-8,764'MD
1 10.4 - 11.0 '1
10-15
20-30
<8
NA
<20
8.5-9.5
87 4'MD-9,490'MD
1 10.4-11.0 1
10-15
20- 0
<5
<10
<20
8.5-9.5
I-" .c-4wi�I / /V• 3< ';-rn /� e4 4-4/ /.;tZ. /7 � x_ ,-
Production Mud Properties: Water Bas d Pol r Fluid FloPro) 6-1/8" Hole Section
Depth Interval
Density
PV (cp)Ib!
p
API FL
HTHP FL •MBT p[i -.'
9,490' MD - TD
1 8.5-9.0,
1 <8
j 12-20
1 <12
NA <4 8.5 - 9.5
Logging Program
8-1/2" Intermediate I Sample Catchers - as required by Geology
Drilling: Dir/GR/RES/PWD/NB GR
Open Hole: None
OAS" Production le Catchers - as required b Geology_
Drillin Dir/GR/RES/DEN/NEU
Oen Hole: None
Cased Hole: None
14-16B PTD
6/21/2017
Cement Program
Casing Size
7" 26# L-80 VamTo HC Intermediate Casing
13Cr VamTo Production Liner
Lead
N/A - Sin le Slurry
Basis
Lead TOC
N/A - Sin Ie Slurry
N/A -Sin Ie rry
Tail
Oen hole volume + 40%excess + 80 ft shoe track
I Oen hole volume + 30%excess + 80 ft shoe track
Tail TOC
Ta et 1500 ft MD above TSGR
Total Cement
Spacer
-30 bbls of Viscosified Spacer weighted to -12.0 Mud Push II
Volume
Tail
50.8 bbis, 285 cuft, 244 sks 15.8 Ib/al Class G -1.17 cuft/sk
79.8 bbis, 448 tuft, 525 sks 15.8 Ib/ al Class G - 1.17 cuft/sk
Temp
I BHST 204° F
Liner Size
4-1
13Cr VamTo Production Liner
Lead
N/A - Sin le Slurr
Basis
Lead TOC
N/A -Sin Ie rry
Tail
I Oen hole volume + 30%excess + 80 ft shoe track
Tail TOC
I TOL
Total Cement
S acer-30
bbis of Viscosified S acer wei hted to -11.0 Mud Push 11
Volume
Tail
79.8 bbis, 448 tuft, 525 sks 15.8 Ib/ al Class G - 1.17 cuft/sk
Tem
BHST 204° F
If the well experiences high lost circulation when drilled to TD, an 8.6ppg BiModal cement
slurry will be pumped. The specs are as follows:
Liner Size
4-112" 12-4#730r
VamToP Production Liner
LeadI
N/A - Sin Ie Slurry
Basis
Lead TOC
I N/A - Single Slurry
Tail
Oen hole volume + 100% excess (minimum )+ 80 ft shoe track
Tail TOC
TOL
Total Cement
Spacer
-20 bbis of Viscosified Spacer weighted to -8.6 pp Mud Push II
Volume
Tail
113.7 bbis, 638 cult, 192 sks 8.6 lb/gal BiModal - 3.33 cuft/sk
Tem
BHST 204° F
Surface and Anti -Collision Issues
Surface Close Proximity:
No wells will be affected by the Parker 272 rig shadow.
Sub -Surface Pressure Management:
Sag River Interval: Shut-in 14-35 no later than 1 week prior to spud.
Anti -Collision:
None. All offset wells pass BP Anti -Collision Scan Criteria.
Minor risked wells will be secured such that a collision would not pose an HSSE risk.
Offset well ownership information
All offset wells identified within 200 ft of the proposed wellbore are operated by BP
14-16B PTD 5 6/21/2017
Hydrogen Sulfide
DS14 is considered an H2S site. Recent H2S data from the pad is as follows:
Faults
There are no prognosed fault crossings.
Drilling Waste Disposal
There is no annular injection in this well. '
Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and
inject at DS -04. Any metal cuttings will be sent to the North Slope Borough.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for
injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB
Environmental Advisors (659-5893) for guidance.
14-16B PTD 6 6/21/2017
Well Name
H2S Level
Date of Reading
Parent Well
14-16A
10 ppm
04/05/2015
#1 Closest SHL Well H2S Level
14-15
36 ppm
02/21/2016
#1 Closest BHL Well H2S Level
14-12
58 ppm
01/03/2015
#2 Closest BHL Well H2S Level
14-28A
38 ppm
04/17/2012
#3 Closest BHL Well H2S Level
14-05A
15 ppm
02/19/2016
#4 Closest BHL Well H2S Level
14-20
32 ppm
05/13/2016
Max Recorded H2S on Pad/Facility
14-21
590 ppm
07/16/1995
Faults
There are no prognosed fault crossings.
Drilling Waste Disposal
There is no annular injection in this well. '
Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and
inject at DS -04. Any metal cuttings will be sent to the North Slope Borough.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for
injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB
Environmental Advisors (659-5893) for guidance.
14-16B PTD 6 6/21/2017
Well Control
The 8-1/2" hole section will be drilled with well control equipment consisting of 5,000 psi working
pressure rams (2), blind/shear rams, and annular preventer capable of handling the maximum
potential surface pressures. Based upon calculations below, BOP equipment will be tested to
3,500 psi.
BOP test frequency for 14-16B will be 7 days until the window is milled at which point it will be
14 days with function test every 7 days. Except in the event of a significant operational issue
that may affect well integrity or pose safety concerns, an extension to the 14 -day BOP test
period should not be requested.
8-1/2" Intermediate Interval
Maximum anticipated BHP
3,244 psi at TSGR at 8,551' TVDss 7.22 ppg EMW, 8640' TVD
Maximum surface pressure
2,379 psi at the TSGR 0.10psi/ft gas gradient to surface
Kick tolerance
25 bbls with 12.5 ppg frac gradient.
Assumes 7.22 ppg pore pressure in the SGR + 0.5 ppg kick
intensity and 10.5 ppq MW.
Planned BOP test pressure
Rams test to 3,500 psi / 250 psi.
Annular test to 3,500 psi / 250 psi
Integrity Test — 8-1/2" hole
LOT after drilling 20'-50' of new hole
9-5/8" x 13-3/8" Casing Test 1
3,000 psi surface pressure
6-1/8" Production Interval
Maximum anticipated BHP
3,244 psi at TSGR at 8,551' TVDss 7.22 ppg EMW, 8640' TVD) .
Maximum surface pressure
2,379 psi at the TSGR 0.10 psi/ft gas gradient to surface)
Kick tolerance
Infinite with >8.7 ppg frac gradient.
Assumes ar 7.22 ppg max pore pressure in the Sag + 0.5 ppg kick
intensity and 8.6 ppq MW.
Planned BOP test pressure
Rams test to 3,500 psi / 250 psi.
Annular test to 3,500 psi / 250 psi
Integrity Test — 6-1/8" hole
FIT after drilling 20'-50' of new hole
4-1/2" Liner Top Packer
3,500 psi surface pressure
Planned completion fluids
8.5 ppg seawater / 2,200 ft diesel to 100' below BPRF
14-16B PTD 7 6/21/2017
Variance Requests
There are no variance requests for 14-16B.
Drill and Complete Operations Summary
Proposed Drilling Operations
1. MI RU Parker 272.
2. Test TWC from above and below to 3,500 psi for 5 minutes each.
3. Nipple down tree. Nipple up BOPE and test to 3,500 psi. (Configured from top to bottom: annular
preventer, 2-7/8" x 5" VBR, blind/shear, mud cross, 2-7/8" x 5" VBR).
4. Pull TWC with lubricator.
5. RU hard lines to wellhead. Circulate out diesel freeze protection and displace well to clean
seawater.
6. Pull 5-1/2" x 4-1/2" tubing from the pre -rig cut.
7. Cut 9-5/8" Casing below wellhead.
8. Pull and laydown 9-5/8" casing from cut.
9. Dress casing cut and cap with shallow capping tool.
10. Pressure test wellbore to-3000psi.
11. PU and RIH with 9-5/8" Smith whipstock assembly and 8.5" window milling assembly. RIH to the
top of the tubing stub. Orient and'set the whipstock. Shear off the whipstock.
12. Displace the well to -10.0 ppg LSND based milling fluid prior to 9-5/8" casing milling operation.
13. Mill a window in the 9-5/8" casing at -3200' MD'.
14. POOH for drilling BHA.
15. MU an 8-1/2" Rotary`Steerable drilling BHA with DIR/GR/RES/PWD/GR-at-bit. RIH
16. Drill 8-1/2" intermediate interval to weight up point above HRZ. Weight up mud to 10.5ppg
(HRZ/Kingak stability).
17. Continue drilling to 7" casing point at the top of the Sag River.
18. Circulate well clean, short trip, run back to TD, circulate wellbore clean. POOH for 7" casing.
19. Run 7", 26#, L-80, Vam-Top HC casing back to surface. Cement 7" casing with 15.8 ppg class G
cement. Displace cement with mud.
20. ND BOP and set 7" slips.
21. NU new tubing spool and test packoffs.
22. Freeze protect the 9-5/8" x 7" annulus.
23. Change out 7" rams to VBR's and test to 250 psi / 3,500 psi.
24. MU a 6-1/8" RSS BHA with DIR/GR/RES/DEN/NEL with a PDC bit and RIH to the 7" landing
collar.
NOTE: may need to run bent motor and insert bit to achieve DLS in plan and land in
sag.
25. Pressure test the casing to 3500 psi.
26. Displace well to the planned 8.6 ppg DIF.
27. Drill out the 7" shoe plus 20' of formation. Pull into the shoe and perform an FIT.
28. Drill the 6-%" production build and lateral as per directional plan. Circulate well clean, short trip as
needed, and POOH.
29. Run 4-1/2", 12.6# 13Cr VamTop liner to TD.
30. Cement liner to TOL with 15.8 ppg Class G cement. If losses are high, 8.6ppg bi-modal ultra -light
cement may be used.
31. Set liner top packer and hanger.
14-168 PTD 8 6/21/2017
32. Displace wellbore to clean seawater and circulate excess cement above TOL.
33. POOH and LD liner running tool.
34. Pressure test liner/packer/casing to 3,500 psi for 30 minutes.
35. CONTINGENCY: RU DPC pert guns, RIH, and perforate liner with MaxForce pert guns (base
plan is to perforate post -rig).
36. RU and run 4-1/2", 12.6# 13Cr VamTop completion per the tally. Tag up in PBR, space out, and
land tubing hanger. RILDS.
37. Displace tubing and IA to clean seawater.
38. Reverse circulate in heated seawater and inhibited seawater to IA and tubing (surface to surface).
39. Drop ball & rod and set production packer. Individually test tubing and IA to 3,500 psi for 30
minutes each.
40. Shear DCK valve.
41. Reverse circulate in diesel freeze protect down IA using rig's injection pump.
42. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm
well is dead.
43. Install TWC and test from above to 250 psi low / 3,500 psi high for 5 minutes each and below to
250 psi low / 3,500 psi high for 5 minutes each.
44. N/D BOPE. NU adapter flange and double master valves. Test to 5,000 psi with diesel.
45. Ensure Heet is left on top of TWC and only diesel is left in the tree.
46. Install all annulus valves and secure the well.
Post -Rig Operations
1. Change out dry hole tree for production tree.
2. DSM to pull TWC.
3. MI/RU slick line. Pull TWC, ball and rod, and RHC plug. Pull shear valve and dummy GLVs.
Install GLVs.
4. Perforate with the Kondike Well Work platform.
5. Flowback/Test.
14-16B PTD 9 6/21/2017
DS14-16 Drilling Critical Issues
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control / Reservoir Pressures
A. Intermediate Hole: The UG4 is expected to be a 9.6 ppg EMW. The CM1 is expected to be a
10.0 ppg EMW. Formation pressures will be controlled with a 10.0 ppg mud weight to drill to
within 200' MD of the CM3. At this point, there will be a weight up to 10.4 — 11.0 ppg to drill the
rest of the interval to TD.
B. Production Hole: The Sag River is expected to be at a 7.22 ppg EMW. Reservoir pressures will be
controlled by using 8.5 — 9.0 ppg water based mud. —
II. Lost Circulation/Breathing
A. Intermediate Hole 1: There are no expected fault crossings in the intermediate hole.
B. Production Hole: There are no expected fault crossings in the production hole. DS14 is known for
high lost circulation and losses should be expected at sub -seismic faults and fractures.
III. Fault Locations
There are no prognosed fault crossings for the proposed 14-16B directional profile
IV. Integrity Testing
Test Point Test Depth Test t e EMW (lb/gal)
8-1/2" Rathole I 20'-50' from the window LOT 1 12.5 ppg minimum
7" shoe20'-50' from the 7" shoe I FIT 8.7 ter,.
V. Hydrogen Sulfide
DS14 is considered an H2S site. Recent H2S data from the nad is as fnllnwc
VI. Anti -Collision Issues
None. All offset wells pass BP Anti -Collision Scan Criteria.
Minor risked wells will be secured such that a collision would not pose an HSSE risk.
CONSULT THE DS14 PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION.
14-166 PTD 10 6/21/2017
Well Name
H2S Level
Date of Reading
Parent Well
14-16A
10 ppm
04/05/2015
#1 Closest SHL Well H2S Level
14-15
36 ppm
02/21/2016
#1 Closest BHL Well H2S Level
14-12
58 ppm
01/03/2015
#2 Closest BHL Well H2S Level
14-28A
38 ppm
04/17/2012
#3 Closest BHL Well H2S Level
14-05A
15 ppm
02/19/2016
#4 Closest BHL Well H2S Level
14-20
32 ppm
05/13/2016
Max Recorded H2S on Pad/Facility
14-21
590 ppm
07/16/1995
VI. Anti -Collision Issues
None. All offset wells pass BP Anti -Collision Scan Criteria.
Minor risked wells will be secured such that a collision would not pose an HSSE risk.
CONSULT THE DS14 PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION.
14-166 PTD 10 6/21/2017
TREE= 5X7 L FMC 120
AELLFEAD=
GRAY
ACTIIATDR=
BAKERC
(B. B -EV =
71'
W. 9 -EV =
0924/(
COP= _ _.
3000'
+tax Angle ---75
a 9818'
)alum l,D=
9727
lahjm TVD=
BOW SS
5-12' TBG, 17#, L-80, .0232 bPf, D = 4.892-
10P OF 4-12" TBG H 22'
133/8' CSG, 72#, L-80, D = 12.347 2601'
Minimum ID = 2.360" @ 8970'
4-1/2" RCP PACKER
41/2' TBG, 12.6#, 13 -CR -80, ????
.0152 bpf, D = 3.958'
F
ARNING2-718'LNR PARTED FALLER112 TBG TAIL (-01114107)
3-1/2' LNR 0.3#, L -8C1, .0087 bPt, D = 2.992-
9-5/8' CSG, 47#, L-80, D = 8.681' 93W
4-12" TBG, 12.6#, 13 -CR -80, .0152 bpf 9232'
D = 3.958' (SFECLUTED BTM 09/14/03)
7' LNR, 29#, L-86. .0371 bpf, D=6A84' 9478'
F6Y9RATON SILWARY
RIEF LOG: OH CAL ON 082&81
ANGLEAT TOP PERF. 75' Q 9868'
Note: Refer to Production DB for historical cert data
2-1/8" 4 9904 - 9908 O
2-118' 4 9916 - 9930 O
2-1/8" 4 9937 - 9953 O
2-7/8- LNR,
14-16A I CEMENT NODES? 70-@9713'.-- OBSTRUCTIONNOT 9550 -
IN
D=2.441- —1
TD
X 4-12" XO
GAM BAL-O
GAS LFT MANDRELS
2 5022
4823
34
TB
DW
T-2
0
0924/(
3 7517
6943
27
TB
DMY
T-2
0
04231
4 8710
8017
24
TB
OW
T-2
0
0924/(
5 8899
8190
24
TB
DIM'
T-2
0
0924/(
9011' 9-518' X 4-12- BK R S-3 R(R ( WAS BEHIND
W
jSLV /STAB (05/03/08)
9059' F75Ft i-12' TOOLSTTNONG, TL =
9085' SFECILAT® TOPOF 2-7/8' LN
4-12' FES
MLLOUT WIDOW r @ 9478'
9878' RUBBER Eli34ENT-71a=ATINGR(R
DATE REV BY COMMENTS
DATE REV BY C.OMVBNTS
09/02/81 ORIGINAL COMPLETION
06/18109 KCF/TLH FALLEN LNROO�f1ONS
05107197 Q16 RNO
06/30/14 RB/ PJC TREE C/O (06/20/14)
12/25f97 NORDIC SIDETRACIO�(14-18A)
0426116 TBLYJ GLV Cl0 (0423/16)
0924103 JBMKK GLV Cf0
08/02/06 JMOPJC TOPPER ANGLECORRECC
12107106 DTR/TLH FDB PLUG w /CAIiFiHR SET
01/14/07 JRM AG FILL PDB R_t161 LET RBH
12-7/8" X 2-3/8" XO I
PR DHOE BAY UNIT
WELL: 14-16A
PERMIT No: 1971670
AR No: 50-029-20608-01
SEC 9, T10FL R14F-1050' FNL 8 1093' FEE
13P Exploration (Alaska)
TFM WLFRC120 ODEA
VYELLFEAD=
GRAY
ACRIATOR=
BAnC
KB. RSP/ =
71'
BF. MV =
1
KOP=
3000
Merz Argk
I1SO E
Datum M)=
9722'
Datum TVD=
88W SS
PROPOSAL
5-12" TBG, 17#, �C22
L-80,.0232 bpf,
13-3/8" CSG, 72C, L-80, D = 12.347" 2601'
Minimum ID = 2.360" @ 89T�
4-112" RCP PACKER
4-12' TBG, 12.6#,13-CR90, ????
.0152 bpf, f.
= 3.956'
WARNING: 2-718- LNR PARTED & FALLEN
4-12- TBG TAIL (-01114/07)
9.3#, L-8D7DD87 bot- D = 2.992'
L-80 BTG D =
.0152 bpf
L-80 BTC,
PERFORATION SLM4ARY
FEF LOG OH CNL ON 0828181
ANGLEATTOPPERF. 75" @ 9868'
Note: Refer to Production DB for historical cert data
2-118" 4 9904:99
- 9908 O
2-118 4 9916 - 9930 O
2-18- 4 9937 - 9953 O
14-16A
101
IZ-fW LNR 6.5#, FL4S..0058 bpf. D=2.441' 1
Q
.TY NOTES: — OBSTRUCTION NOTED @ 9550 -
CEMENTNODES? 70°@9713'.—CHROMETBG
5-12' X 4-12' XO
4-12" CAM BAL-O SSSV NP, D = 3.812"
F.ASI FT LMNIIRR C
ST
ND lVD
DEV TYPE
VLv
ILATCHIP091"I
06/30/14 RB/ PJC TREE GfO (0620114)
DATE
1
3026 3024
10
TB
I1SO E
T-2
16
08!02/16
2
5022 4823
34
TB
T-2
20
06!02/16
3
7517 6943
27
TBDMY
T 2
0
0423116
4
8712 Will
23
TB
q.N
T-2
0
10M26198
5
8898 8189
24
TB
DW
T-2
0
0924103
YOPOF4-117 DEPLOY SLV & 2-
9LV /STUB (05103108)
FSH: 1-12' TOOLSniNC, TL = 2
3PE LATEDTOP OF 2-71B- UV
3PBxjLATED TOP OF 4-12" TT (i
HES XN
MJ-OUr VMDOW 7"@9478'
8876' RUBBER EL AE NT-TRFATNG WR
DATE REl/ BY COWAR 1'3
DATE REV BY COM.BNTS
09/02/81 IORMALcompLEnoN
08118109 KCFfrLH FALLEN LNR COPo€CRONS
05107197 0-16 RWO
06/30/14 RB/ PJC TREE GfO (0620114)
1225197 NDROC SIDETRACK® (14.1611)
04/26/16 -ffDIJLU GLV 00 (04/23/16)
092483 JBMTIX GLV C/0
0722/16 JM) t1PDATEDGLV DWRSPERTALLY
08/02106 JMdPJC TOPPER ANGLE CORFWMN
08/08/16 JGUJMI GLV 00(08/02/16)
12/07106 DTWM PDB PLUG w/CAR IW RSET
10/25/16 M#JAD PF;E-M EDITS
01/14/07 JRP PAG PULL POB FLUG / LffT FISH
10199' 1
XO
PRUDHOE BAY UNIT
WELL: 14-16A
PE MT Nb: 9971670
AR No: 50-029.20608-01
'10N, R14E 105V FPL & 1093' FEL
BP Exploration (Alaska)
TREE =
5X7 L FMC 120
WELLHEAD=
GRAY
OR
��1'
PROPOSED
KB.ELE
KB. BEV =
71'
BF. ae1=
REV 3
KOP=
3000'
Max Angle =—"
@_
9-5/8' CSG STUB
--
Datum 6U-
Datum TVD =
8800'SS'.(—/—/�
9-5/8- BOVYEN CSG PATCH, D = 8.681' —
13-3/8' (SG, 72#. L-80. D = 12.347• 26-01
19-5/8- CSG, 470. L-80 BTC. D = 8.681' H -3200'
Minimum ID = "
7• roc —7880' '
12" TBG, 12.6#, 13CIL85 VAM TOP,
152 bpf, D = 3.958-
7' CSG, 26#, L-80 VA TOP HC,
.0383 Of, D = 6.276'
PERFORATION SLMVMRY
REP LOG: ON
ANGLE AT TOP PERF _° @
Note: Refer to Production DB for historical perf data
LNR, 126#, 13
opt. D = 3.958•
1 12760'- I
14-16B
LDL
_TY NOTES: WELL ANGLE> 70^ MAX
S: _'@ _. —CHROME TBG 8 LNR •^
V= 8.681'
MLLOIfT VVWDOW (14-16B) -3200' - -3210'
GAS LFT MANDRELS
5
4
3
2
1
1 —9500' 1
REV BY COMME34f5
DATE REV BY OOMMINM
ORIGINAL COMPLETION
10/24/16 WAV BLALT PROPOSED REV 3
616 RWO
NORDIC SIDETRAq®(14-16A)
107t26/16
SIDETRAC1037(14-16B)
JMD BULT PROPOSBD
NWJMD BULT PROPOSED REV 1
NWJMD BULT PROPOSED REV 2
D = 3.812"
17"X 4-12' 4IES TNT PCR_ D = • I
14-1/2- HES X NP, D = 3.812. 1
HES X NP, D =
X 4-1/2' WFD LTP d F8
/TIEBACK SLV, D=
1/2' WLEG. D= 3.958'
2,►.,� bps,N40�I
North America - ALASKA - BP
Prudhoe Bay
PB DS 14
14-16
Plan 14-16B
Plan: 14-16B wp06a
BP Well Plan Survey Report
20 June, 2017
F
igs
BAKER
HUGHES
by
Company:
North America -ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 14
Well:
14-16
Wellbore:
Plan 14-16B
Design:
14-168 wpO6a
BP
PB DS 14, TR -10-14
//.RS
BP Well Plan Survey Report
From:
BAKER
Position Uncertainty:
0.00 usft
HUGHES
Local Co-ordinate Reference:
Well 14-16
+N/ -S 0.00 usft
TVD Reference:
14-168 Plan @ 89.25usft (ngx) •
Position Uncertainty
MD Reference:
14-16B Plan @ 89.25usft (rigx)
Plan 14-168
North Reference:
True -
Wellhead Elevation:
Survey Calculation Method:
Minimum Curvature -
14-168 wp06a
Database:
EDM R5K - Alaska PROD - ANr..Pt
Project Prudhoe Bay, GPB, PRUDHOE BAY
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK [4267.15864] Using Well Reference Point
Map Zone: NAD27 ° OGP-Usa AK / Alaska zone 4 [26734'1586 Using geodetic scale factor
Site
PB DS 14, TR -10-14
Site Position:
70° 14'26346 N
From:
Map
Position Uncertainty:
0.00 usft
Well
14-16,14-16
Well Position
+N/ -S 0.00 usft
Northing:
+E/ -W 0.00 usft
Position Uncertainty
0.00 usft
Wellbore
Plan 14-168
Magnetics
Model Name Sample Date
Wellhead Elevation:
BGGM2016 9/4/2017
Design
14-168 wp06a
Audit Notes:
Version:
Vertical Section:
Phase:
Depth From (TVD)
(usft)
4709
Northing:
5,939,577.430 usft
Latitude:
70° 14'26346 N
Easting:
674,150480 usft
Longitude:
148° 35'36.726 W
Slot Radius:
0.000 in
Grid Convergence:
1.32 °
Northing:
5,939,293.700 usft •
Latitude-
70° 14'23.277 N
Easting:
675,373.690 usft
Longitude:
148° 35' 1.368 W
Wellhead Elevation:
42.16 usft
Ground Level:
42.10usft
Declination
Dip Angle Field Strength
(nT)
17.72
80.97
57,542
PLAN Tie On Depth: 3.118.25
-NI-S +E/ -W
Direction
(usft) (usft)
(°)
0.00 0.00
110.00
6/20/2017 9:58.44AM Page 2 COMPASS 5000.1 Build 81D
JAO&b
y
13PP
{A yyf�ite._,
BP Well Plan Survey Report
BAKER
HUGHES
Company: North America - ALASKA- BP
Project Prudhoe Bay
Local Co-ordinate Reference:
Well 14-16
Site: PB DS 14
TVD Reference:
14-168 Plan @ 89.25usft (rigx)
Well: 14-16
MD Reference:
14-16B Plan C 89.25usft (rigx)
Wellbore: Plan 14-16B
North Reference:
True
Design: 74188 wpOea
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Survey Tool Program Date 6/20/2017
- -
From To
(usft) (usft) Survey (Wellbore)
Tool Name
Description
118.25 3,118.25 1 : Camera based gyro multisho (14-16)
CB-GYRO-MS
Camera based gyro multishot
3,118.25 3,200.00 14-16B wp06a (Plan 14-16B)
CB-GYRO-MS
Camera based gyro multishot
3,200.00 3,800.00 14-16B wp06a (Plan 14-16B)
INC-TREND
Inclinometer- known azi trend
3,800.00 9,487.0014-168 wp06a(Plan 14-168)
MWD
MWD- Standard
3,800.00 9,487.00 14-163 Wp068 (Plan 14168)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O
Crustal
9,487.00 10,700.0014-166 wp06a (Plan 14168)
MWD
MWD - Standard
9,487.00 10,700.0014-16B wp06a(Plan 14-168)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O
Crustal
10,700.00 12,761.70 14-16B WP06a (Plan 14-16B)
MWD
MWD- Standard
10,700.00 12,761.7614-16B wpo6a(Plan 14-168)
MWD+IFR+MS-WOCA
MWD +IFR+Multi Station W/O Crustal
Planned Survey
- -
MD Inc Azi (azimuth)
(usft) 1°)
TVD
TVDSS
NIS ENV
Northing
Easting DLeg
TFace
(')
3,118.25 11.25
(usft)
(usft)
(usft) (usft)
(usft)
(usft) (°/t00usft)
(^)
48.00
3,115.17
3,025,92
17.12 37.46
5,939,311.684
675,410.739 0.00
0,00
TIP
3,200.00 12.27 44.67
3,195.20
3,105.95
28.63 49.49
5,939,323.474
675,422.501 1.50
KOP-9618"
-35.28
3,217.00 12.44 35.16
3,211.81
3,122.56
31.41 51.82
5,939,326,309
675,424.759 12.00
Start 20.00 hold at 3217.00 MD
-90.00
3,237.00 12.44 35.16
3,231.34
3,142.09
34.94 54.30
5,939,329.887
675,427.157
Start DLS 2.50 TFO 270.00
0.00
0.00
3,255.34 12.44 33.03
3,249.25
3,160.00
38.21 56.51
5,939,333.208
675,429.294 2.50
SV3
-90.00
3,300.00 12.53 27.88
3,292.86
3,203.61
46.52 61.40
5,939,341.637
675,433.987 2.50
3,400.00 13.08 16.85
3,390.38
3,301.13
66.95 69.75
5,939,362.246
675,441.864 2.50
-8792
3,465.64 13.67 10.23
3,454.25
3,365.00
81.69 73.28
5,939,377.064
675,445.049 2.50
-82.90
SV2
-72.14
3,500.00 14.04 7.00
3,487.61
3,398.36
89.82 74.51
5,939,385.222
675,446.088 2.50
3,600.00 15.35 358.59
3;584.34
3,495.09
115.10 75.66
5,939,410.520
675,446.652
-65.69
2.50
-62.56
3,700.00 16.93 351.59
3,680.41
3,591.16
142.74 73.21
5,939,438.093
675,443.555 2.50
-54.43
6202017 9:58:44AM
Pape 3
COMPASS 50001 Build 81D
�44s
ND
(usft)
3,775.62
3,810.59
MD
b p
"Os 44k
1°1
Company:
North America -ALASKA -BP
Project:
Prudhoe Bay
Site:
PB DS 14
Well:
14-16
Wellborn:
Plan 14-168
Design:
14-168 wp06a
Planned Survey
ND
(usft)
3,775.62
3,810.59
MD
Inc
(usft)
1°1
3,800.00
18.70
3,837.00
1939.
Start DLS 2.50 TFO 90.00
3,856.78
1940.
SW
5,939,485.757
3,900.00
1945.
4,000.00
19.80
4,100.00
20.44
4,200.00
21.34
4,300.00
22A7
4,337.00
22.94
Start DLS 3.00 TFO -24.62
4,400.00
24.67
4,500.00
27.46
4,526.34
28.20
UG4
85.54
7859
71.98
6586
60.32
4,600.00
30.28
4,700.00
33.14
4,730.81
34.02
UG3
3.00
3.00
3.00
4,800.00
36.01
4,900.00
38.90
5,000.00
41,81
5,100.00
44.72
5,200.00
47.64
5,240.01
48.81
Start 681.05 hold
at 5240.01 MD
5,300.00
48.81
8/2012017 9:58.44AM
BID
ND
(usft)
3,775.62
3,810.59
NDSS
(usft)
3,686.37
3,721.34
BP Well Plan Survey Report
ENV
(usft)
67.15
64.00
BAKER
Easting
(usft)
675,436.803
675,433.380
DLeg
(°1100usft)
2.50
2.50
HUGHES
Local Co-ordinate Reference:
Well 14-16
3,740.00
ND Reference:
14-16B Plan @ 89.25usft (rigx)
5,939,485.757
MD Reference:
14-168 Plan @ 89.25usft (dgx)
90.00
North Reference:
True
3,780.76
Survey Calculation Method:
Minimum Curvature
5,939,499.682
Database:
EDM R5K - Alaska PROD - ANCP1
86.60
Azi (azimuth)
(°)
345.82
343.94
ND
(usft)
3,775.62
3,810.59
NDSS
(usft)
3,686.37
3,721.34
NIS
(usft)
172.68
184.34
ENV
(usft)
67.15
64.00
Northing
(usft)
5,939,467.888
5,939,479.465
Easting
(usft)
675,436.803
675,433.380
DLeg
(°1100usft)
2.50
2.50
TFace
(°)
-47.70
-4220
345.43
3,829.25
3,740.00
190.67
62.27
5,939,485.757
675,431.499
2.50
90.00
348.68
3,870.01
3,780.76
204.68
59.05
5,939,499.682
675,427.956
2.50
86.60
356.05
3.09
9.63
15.61
17.67
3,964.22
4,058.13
4,151.57
4,244.36
4,278.49
3,874.97
3,968.88
4,062.32
4,155.11
4,189.24
237.91
272.24
307.62
343.97
357.65
54.81
54.38
58.37
66.56
70.65
5,939,532.799
5,939,567.118
5,939,602.574
5,939,639.099
5,939,652.871
675,422.748
675,421.724
675,424.885
675,432.225
675,435.997
2.50
2.50
2.50
2.50
2.50
85.54
7859
71.98
6586
60.32
15.79
13.26
12.67
4,336.13
4,425.95
4,449.25
4,246.88
4,336.70
4,360.00
382.00
424.54
436.52
77.96
88.92
91.68
5,939,677.386
5,939,720.161
5,939,732.205
675,442.734
675,452.708
675,455.186
3.00
3.00
3.00
-24.62
-22.89
-20.62
11.16
9.39
4,513.52
4,598.58
4,424.27
4,509.33
471.72
523.44
99.09
108.44
5,939,767.571
5,939,819.484
675,461.777
675,469.915
3.00
3.00
-20.70
-18.78
8.90
4,624.25
4,535,00
540.26
111.15
5,939,836.363
675,472.231
3.00
-17.28
7.88
6.56
5.40
4.36
4,680.92
4,760.29
4,836.49
4,909.31
4,591.67
4,671.04
4,747.24
4,820.06
579.53
639.86
704.25
772.53
116.93
124.55
131.27
137.09
5,939,875.760
5,939,936.243
5,940,000.769
5,940,069.159
675,477.101
675,483.315
675,488.539
675,492.760
3.00
3.00
3.00
3.00
-1887
-16.03
-14.99
-14.10
3.42
3.07
4,978.54
5,005.19
4,889.29
4,915.94
844.51
874.30
141.97
143.66
5,940,141.228
5,940,171.049
675,495.965
675,496.961
3.00
3.00
-13.34
-12.69
3.07 _
5,044.69
4,955.44
919.36
146.08
5,940,216.172
675,498.332
0.00
0.00
Page 4
COMPASS
5000.1 Build 51D
by
Company: North America - ALASKA -BP
Project: Prudhoe Bay
Site: PB DS 14
Well: 14-16
Wellbore: Plan 14-16B
Design: 14-168 wpO6a
I Planned Survey
MD
Inc
lusft)
1°1
5,400.00
48.81
5,500.00
48.81
5,600.00
48.81
5,603.05
48.81
UGI
14-16B Plan @ 89.25usft (dgx)
5,700.00
48.81
5,800.00
48.81
5,900.00
48.81
5,921.06
48.81
Start DLB 3.00 TFO 174.88
6,000.00
46.46
6,100.00
43.47
6,200.00
40.48
6,248.55
39.04
WS2
5,940,366.609
6,300.00
37.50
6,400.00
34.52
6,500.00
31.54
6,586.72
28.97
WSI
6,600.00
28.57
6,700.00
25.60
6,800.00
22.65
6,808.75
22.39
CM3
0.00
6,900.00
19.70
7,000.00
16.77
7,100.00 13.87
6/20/2017 9:5844AM
BP
TVD
F)AFRI
BP Well Plan Survey Report
ENV
BAKER
Easting
DLeg
NUGRES
Local Co-ordinate Reference:
W611 14-16
(usft)
TVD Reference:
14-16B Plan @ 89.25usft (dgx)
(usft)
MD Reference:
14-16B Plan @ 89.25usft (rigx)
(°)
North Reference:
Tme
5,021.29
Survey Calculation Method:
Minimum Curvature
5,940,291.391
Database:
EDM R5K- Alaska PROD - ANCP1
000
Azi(admuth)
TVD
1VDSS
NIS
ENV
Northing
Easting
DLeg
TFace
(°)
last)
(usft)
(usft)
(usft)
(usft)
(usft)
r1100usft)
(°)
3.07
5,110.54
5,021.29
994.53
150.11
5,940,291.391
675,500.616
0.00
000
3.07
5,176.39
5,087.14
1,069.68
154.14
5,940,366.609
675,502.900
0.00
0.00
3.07
5,242.24
5,152.99
1,144.83
158.18
5,940,441.828
675,505.185
0.00
3.07
5,244.25
5,155.00
1,147.12
158.30
5,940,444.121
675,505.254
0.00
000
0.00
3.07
5,308.09
5,218.84
1,219.98
162.21
5,940,517.046
675,507.469
0.00
0.00
3.07
5,373.94
5,264.69
1,295.13
166.24
5,940,592.265
675,509.754
0.00
0.00
3.07
5,439.79
5,350.54
1,370.28
170.28
5,940,667.484
675,512.038
0.00
0.00
3.07
5,453.66
5,364.41
1,386.11
171.13
5,940,683.326
675,512.519
0.00
0.00
3.36
5,506.85
5,417.60
1,444.34
174.40
5,940,741.612
675,514.435
3.00
174.88
3.77
5,577.60
5,488.35
1,514.86
178.79
5,940,812.210
675,517.181
3.00
174.68
4.22
5,651.93
5,562.68
1,581.57
183.44
5,940,879.010
675,520.277
3.00
17440
4.46
5,689.25
5,600.00
1,612.53
185.79
5,940,910.015
675,521.904
3.00
174.06
4.73
5,729.64
5,640.39
1,644.30
188.34
5,940,941.828
675,523.715
3.00
173.88
5.31
5,810.52
5,721.27
1,702.86
193.47
5,941,000.491
675,527.485
3.00
173.67
5.99
5,894.35
5,805.10
1,757.10
198.82
5,941,054.839
675,531.576
3.00
173.19
6.68
5,969.25
5,880.00
1,800.53
203.64
5,941,098.360
675,535.376
3.00
172.62
6.80
5,980.89
5,891.64
1,806.88
204.39
5,941,104.724
675,535.978
3.00
172.03
7.77
6,069.91
5,980.66
1,852.04
210.14
5,941,150.007
675,540.679
3.00
171.931
8.98
6,161.17
6,071.92
1,892.48
216.07
5,941,190.566
675,545.664
3.00
171.06
9.10
6,169.25
6,080.00
1,895.78
216.59
5,941,193.885
675,546.114
3.00
169.95
10.53
6,254.41
6,165.16
1,928.07
222.15
5,941,226.288
675,550.922
3.00
169.841
12.60
6,349.38
6,260.13
1,958.72
228.39
5,941,257.077
675,556.437
3.00
168.51
_15.52
6,445.82
6,356.57
1,984.35
234.74
5,941,282.848
675,562.195
3.00
166.54
Page 5
COMPASS
5000.1 Build 81D
Planned Survey
MD
Inc
.�••�
by
%W
11.02
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 14
Well:
14-16
Wellbore:
Plan 14-16B
Design:
14-166 wpO6a
Planned Survey
MD
Inc
lusft)
1°1
7,200.00
11.02
7,300.00
8.28
7,400.00
579
7,402.98
5.73
CM2
14-168 Plan @ 89.25usft (ngx)
7,500.00
4.07
7,600.00
4.20
7,700.00
6.05
7,800.00
8.57
7,900.00
11.33
8,000.00
14.19
8,024.54
14.90
CM1
6,552.79
8,100.00
17.09
8,200.00
20.03
8,300.00
22.98
8,400.00
25.94
8,500.00
28.90
8,505.56
29.07
THRZ
3.00
8,536.91
30.00
Start 960.00 hold at 6636.91 MD
8,600.00
30.00
8,700.00
30.00
8,707.49
30.00
LCUITKNG
70.59
8,800.00
30.00
8,900.00
30.00
BP
TVD
rel.w
BP Well Plan Survey Report
EIW
BAKER
Easting
DLeg
HUGHES
Local Co-ordinate Reference:
Well 14-16
(usft)
TVD Reference:
14-168 Plan @ 89.25usft (ngx)
(usft)
MO Reference:
14-160 Plan @ 89.25usft (rigx)
(I
North Reference:
True
6,454.21
Survey Calculation Method:
Minimum Curvature
5,941,303.529
Database:
EDM R5K-Alaska PROD -ANCPi
163.73
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
TFace
(°I
(usft)
(usft)
(usft)
(risk)
(usft)
(usft)
(°1100usft)
(I
19.92
6,543.46
6,454.21
2,004.89
241.21
5,941,303.529
675,568.179
3.00
163.73
27.26
6,642.04
6,552.79
2,020.28
247.76
5,941,319.065
675,574.373
3.00
159.43
4125
6,741.29
6,652.04
2,030.48
254.39
5,941,329.412
675,580.761
3.00
152.19
41.85
6,744.25
6,655.00
2,030.70
254.58
5,941,329.640
675,580.954
3.00
138.30
70.59
6,840.93
6,751.68
2,035.45
261.07
5,941,334.543
675,587.324
3.00
137.71
113.13
6,940.69
6,851.44
2,035.20
267.78
5,941,334.443
675,594.045
3.00
10906
140.25
7,040.30
6,951.05
2,029.71
274.52
5,941,329.113
675,600.905
3.00
66,63
153.18
7,139.49
7,050.24
2,019.00
281.25
5,941,318.567
675,607.886
3.00
39.60
160.07
7,237.98
7,148.73
2,003.11
287.97
5,941,302.834
675,614.968
3.00
26.77
164.26
7,335.50
7,246.25
1,982.07
294.84
5,941,281.958
675,622.131
3.00
1998.
165.04
7,359.25
7,270.00
1,976.13
296.28
5,941,276.055
675,623.900
3.00
15.90
167.05
7,431.78
7,342.53
1,955.94
301.27
5,941,255.995
675,629.358
3.00
15.14
169.05
7,526.57
7,437.32
1,924.80
307.81
5,941,225.016
675,636.826
3.00
13.21
170.56
7,619.61
7,530.36
1,888.73
314.27
5,941,189.107
675,643.917
3.00
11.31
171.74
7,710.63
7,621.38
1,847.83
320.61
5,941,148.366
675,651.211
3.00
9.91
172.69
7,799.38
7,710.13
1,802.21
326.83
5,941,102.905
675,658.487
3.00
8.83
172.74
7,804.25
7,715.00
1,799.53
327.17
5,941,100.239
675,658.891
3.00
799
173.00
7,831.53
7,742.28
1,784.20
329.09
5,941,084.955
675,661.165
3.00
7.95
173.00
7,886.16
7,796.91
1,752.89
332.93
5,941,053.747
675,665.736
0.00
173.83
173.00
7,972.76
7,883.51
1,703.26
339.02
5,941,004.278
675,672.982
0.00
0.00
173.00
7,979.25
7,890.00
1,699.55
339.48
5,941,000.572
675,673.525
0.00
0.00
173.00
8,059.36
7,970.11
1,653.64
345.12
5,940,954.809
675,680.228
0.00
0.00
173.00
8,145.97
8,056.72
1,604.01
351.21
5,940,905.340
675,687.473
0.00
000
62072017 9:58'44AM Page 6 COMPASS 5000.1 Build 810
by
BP Well
BP
Plan Survey Report
Company: North America - ALASKA - BP
Project: Prudhoe Bay
BAKER
Site: PB DS 14
Well: 14-16
Wellbore: Plan 14-16B
Design: 14-16B Wp06a
Local Co-ordinate Reference:
Planned Survey
MD Inc
AN (azimuth)
(usft) 1°I
(°)
9,000.00
30.00
173.0(
9,100.00
30.00
173.00
9,200.00
30.00
173oC
9,273.30
30.00
173.00
TJB
North Reference:
9,300.00
30.00
173.00
9,386.46
30.00
173.00
TJA
Survey Calculation Method:
Minimum Curvature
9,400.00
30.00
173.00
9,486.91
30.00
173.00
Start 25.00 hold at 9486.91 MD - TSGR - 7-
PROD - ANCPi
9,500.00
30.00
173.00
9,511.91
30.00
173.00
Start Build 6.00
DLeg
(°1100usft)
0.00
TFace
(°)
0.00
9,518.10
30.37
173.00
TSHU
5,940,806.402
5,940,756.934
5,940,720.675
675,701.965
675,709.211
675,714.522
9,600.00
35.29
173,00
9,610.09
35.89
173.00
TSAD
675,716.457
675,722.721
0.00
0.00
9,618.76
36.41
173.00
Start Build 12.00
381.68
386.98
5,940,657.996
5,940,615.000
9,700.00
46.16
173.00
9,800.00
58.16
173.00
9,900.00
70.16
173.00
10,000.00
82.16
173.00
10,100.00
94.16
173.00
10,200.00
106.16
173.00
6/202077 9:56:44AM Page 7 COMPASS 5000 1 Build 81O
BP Well
BP
Plan Survey Report
BAKER
HUGHES
Local Co-ordinate Reference:
Well 14-16
TVD Reference:
14-16B Plan @ 89.25usft
(rigx)
MD Reference:
14-168 Plan @ 89.25usft
(rigx)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska
PROD - ANCPi
TVD
(usft)
8,232.57
TVDSS
(usft)
8,143.32
NIS
(usft)
1,554.38
EIW
(usft)
357.31
Northing
(usft)
5,940,855.871
Easting
(usft)
675,694.719
DLeg
(°1100usft)
0.00
TFace
(°)
0.00
8,319.17
8,405.77
8,469.25
8,229.92
8,316.52
8,380.00
1,504.75
1,455.13
1,418.75
363.40
369.49
373.96
5,940,806.402
5,940,756.934
5,940,720.675
675,701.965
675,709.211
675,714.522
0.00
0.00
0.00
0.00
0.00
0.00
8,492.38
8,567.25
8,403.13
8,478.00
1,405.50
1,362.59
375.59
380.85
5,940,707.465
5,940,664.696
675,716.457
675,722.721
0.00
0.00
0.00
0.00
8,578.98
8,654.25
8,489.73
8,565.00
1,355.87
1,312.74
381.68
386.98
5,940,657.996
5,940,615.000
675,723.702
675,730.000
0.00
0.00
0.00
0.00
6,665.58
8,675.90
8,576.33
8,586.65
1,306.25
1,300.33
387.77
388.50
5,940,608.527
5,940,602.633
675,730.848
675,731.811
0.00
0.00
0.00
0.00
8,681.25
8,592.00
1,297.24
388.88
5,940,599.554
675,732.282
6.00
000
8,750.05
8,758.25
8,660.80
8,669.00
1,253.19
1,247.36
394.29
395.00
5,940,555.641
5,940,549.833
675,738.694
675,739.545
6.00
6.00
0.00
0.00
8,765.25
8,676.00 •
1,242.29
395.63
5,940,544.774
675,740.286
6.00
0.00
8,826.23
8,887.46
8,736.98
8,798.21
1,189.15
1,110.91
402.15
411.76
5,940,491.802
5,940,413.811
675,748.045
675,759.468
12.00
12.00
0.00
0.00
8,930.97
8,954.84
8,958.05
8,940.44
8,841.72
8,865.59
8,868.80
8,851.19
1,021.74
925.54
826.52
729.00
422.71
434.52
446.68
458.65
5,940,324.928
5,940,229.039
5,940,130.332
5,940,033.124
675,772.487
675,786.532
675,800.990
675,815.228
12.00
12.00
12.00
12.00
0.00
0.00
0.00
000
6/202077 9:56:44AM Page 7 COMPASS 5000 1 Build 81O
*009
Ir
"0by
Company: North America -ALASKA -BP
Project: Prudhoe Bay
Site: PB DS 14
Well: 14-16
Wellbore: Plan 14-16B
Design: 14-165 wpO6a
Planned Survey
MD Inc
TVD
(usft) I°I
BP Well Plan Survey Report
10,268.76
114.41
Start 160.00 hold at 10268.76 MD
10,300.00
114.41
10,400.00
114.41
10,428.76
114.41
Start DLS 7.00 TFO.107.32
(usft)
10,500.00
112.84
10,600.00
110.36
10,700.00
107.61
10,800.00
104.64
10,900.00
101.48
11,000.00
98,19
11,100.00
94.80
11,200.00
91.36
11,247.77
89.71
Start 240.86 hold at 11247.77 MD
11,300.00
89.71
11,400.00
89.71
11,488.63
89.71
Start DLS 5.00 TFO.84.39
11,500.00
89.76
11,548.64
90.00
Start OLS 5.00 TFO 0.00
8,850.50
11,558.90
90.51
Start 553,45 hold at 11558.90 MD
11,600.00
90.51
11,700.00
90.51
11,800.00
90.51
BP
TVD
FSFA9
BP Well Plan Survey Report
E/W
BAKER
Besting
DLeg
HUGHES
Local Co-ordinate Reference:
Well 14-16
(usft)
TVD Reference:
14-16B Plan @ 89.25usft (rigx)
(usft)
MD Reference:
14-168 Plan @ 89.25usft (rigx)
(°)
North Reference:
True
8,827.38
Survey Calculation Method:
Minimum Curvature
5,939,969.372
Database:
EDM R5K - Alaska PROD - ANCP1
0.00
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Besting
DLeg
TFace
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usf)
(°)
173.00
8,916.63
8,827.38
665.04
466.50
5,939,969.372
675,824.566
12.00
0.00
173.00
8,903.71
8,814.46
636.81
469.97
5,939,941.223
675,828.689
0.00
178.78
173.00
8,862.39
8,773.14
546.42
481.07
5,939,851.130
675,841.885
0.00
0.00
173.00
8,850.50
8,761.25
520.43
484.26
5,939,825.222
675,845.680
0.00
0.00
167.83
8,821.94
8,732.69
456.10
495.14
5,939,761.169
675,858.051
7.00
-107.32
160.79
8,785.09
8,695.84
36668
520.30
5,939,672.362
675,885.289
7.00
-109.39
153.98
8,752.52
8,663.27
279.48
556.68
5,939,586.038
675,923.679
7.00
-11199
147.38
8,724.72
8,635.47
195.80
603.72
5,939,503.482
675,972.649
7.00
-114.21
140.97
8,702.10
8,612.85
116.90
660.72
5,939,425.925
676,031.468
7.00
-116.04
134.70
8,685.01
8,595.76
43.93
726.84
5,939,354.523
676,099.261
7.00
-117.49
128.53
8,673.68
8,534.43
-22.00
801.08
5,939,290.341
676,175.016
7.00
-118.56
122.43
8,668.31
8,579.06
-79.91
882.35
5,939,234.337
676,257.604
7.00
-119.26
119.52
8,667.86
8,578.61
-104.49
923.30
5,939,210.717
676,299.114
7.00
-119.59
119.52
6,668.13
8,578.88
-130.23
968.75
5,939,186.048
676,345.145
0.00
-0.84
119.52
8,668.64
8,579.39
-179.50
1,055.77
5,939,138.817
676,433.279
0.00
0.00
119.52
8,669.10
8,579.85
-223.17
1,132.90
5,939,096.953
676,511.396
0.00
0.00
118.95
116.53
8,669.15
8,669.25
8,579.90
8,580.00
-228.73
-251.37
1,142.81
1,185.86
5,939,091.634
5,939,070.000
676,521.440
676,565.000
5.00
5.00
-84.39
-84.39
116.53
8,669.20
8,579.95
-255.95
1,195.04
5,939,065.633
676,574.280
5.00
0.00
116.53
116.53
8,668.84
8,667.94
8,579.59
8,578.69
-274.31
-318.98
1,231.81
1,321.27
5,939,048.135
5,939,005.560
676,611.463
676,701.936
0.00
0.00
000
0.00
116.53
8,667.05
8,577.80
-363.65
1,410.73
5,938,962.984
676,792.408
0.00
0.00
8202017 9:58:44AM Page 8 COMPASS 5000.1 Build 810
.0"'. b
p
sr,#41r
Company: North America -ALASKA - BP
Project: Prudhoe Bay
Site: PB DS 14
Well: 14-16
Wellbore: Plan 14-16B
Design: 14-168 wp06a
Planned Survey
TVD
(usft)
8,666.15
8,665.26
8,664.36
8,664.25
MD
Inc
(usft)
(')
11,900.00
90.51
12,000.00
90.51
12,100.00
90.51
12,112.35
90.51
Start DLS 4.00 TFO -123.13
12,161.92
89.43
Start 599.94 hold
at 12161.92 MD
12,200.00
89.43
12,300.00
89.43
12,400.00
89.43
12,500.00
89.43
12,600.00
89.43
12,700.00
89.43
12,761.76
89.43
TO at 12761.76
0.00
0.00
0.00
BP
TVD
(usft)
8,666.15
8,665.26
8,664.36
8,664.25
{+>;
BP Well Plan Survey Report
E/W
(usft)
1,500.20
1,589.66
1,679.12
1,690.17
BAKER
Easting
(usft)
676,882.880
676,973.353
677,063.825
677,075.000
DLeg
(°I100usf)
0.00
0.00
0.00
0.00
HUGHES
Local Co-ordinate Reference:
Well 14-16
8,575.03
TVD Reference:
14-168 Plan @ 89.25usft (ngx)
5193809.549
MD Reference:
14-16B Plan @ 89.25usft (rigx)
-123.13
North Reference:
True
8,575.40
8,576.40
8,577.40
8,578.39
Survey Calculation Method:
Minimum Curvature
5,938,794.341
5,938,754.405
5,938,714.470
5,938,674.534
Database:
EDM R5K - Alaska PROD - ANCP1
0.00
0.00
0.00
0,00
Azi (azimuth)
(°)
116.53
116.53
116.53
116.53
TVD
(usft)
8,666.15
8,665.26
8,664.36
8,664.25
TVDSS
(usft)
8,576.90
8,576.01
8,575.11
8,575.00
NIS
(usft)
-408.32
-452.99
-497.67
-503.18
E/W
(usft)
1,500.20
1,589.66
1,679.12
1,690.17
Northing
(usft)
5,938,920.409
5,938,877.834
5,938,835.259
5,938,830.000
Easting
(usft)
676,882.880
676,973.353
677,063.825
677,075.000
DLeg
(°I100usf)
0.00
0.00
0.00
0.00
TFace
I°)
0.00
0.00
0.00
000
114.87
8,664.28
8,575.03
-524.68
1,734.83
5193809.549
677,120.145
4.00
-123.13
114.87
114.87
114.87
114.87
8,664.65
8,665.65
8,666.65
8,667.64
8,575.40
8,576.40
8,577.40
8,578.39
-540.70
-582.76
-624.82
-666.88
1,769.38
1,860.10
1,950.82
2,041.54
5,938,794.341
5,938,754.405
5,938,714.470
5,938,674.534
677,155.053
677,246.720
677,338.387
677,430.054
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0,00
114.87
114.87
114.87
8,668.64
8,669.63
8,670.25
8,579.39
8,580.38
8,581.00
-708.94
-751.00
-776.97
2,132.28
2,222.98
2,279.00
5,938,634.599
5,938,594.663
5,938,570.000
677,521.722
677,613.389
677,670.000
0.00
0.00
0.00
0.00
0.00
0.00
12,761.78 8,670.25 41/2"
9,486.91 8,654.25 7"
3,200.00 3,195.20 95/8"
4.500 6.125
7.000 8.500
9.625 12.250
6/102017 9:5844AM Page 9
COMPASS 5000.1 Build 810
by
BP
BP Well Plan Survey Report
Company: North America -
ALASKA - BP
Project: Prudhoe Bay
Local Co-ordinate Reference:
Site: PB DS 14
ND Reference:
Well- 14-16
MD Reference:
Wellbore: Plan 14-788
North Reference:
Survey Calculation Method:
Design: 14-16B wpD6a
Database:
Formations
Measured
Vertical
Depth
Depth
Dip
lusft)
(usft)
Dip Direction
Name
Lithology
3,856.78
3,829.25
SV1
6,248.55
5,689.25
W82
2,709.37
2,709.25
SW
8,505.56
7,804.25
THRZ
9,610.09
8,758.25
TSAD
7,402.98
6,744.25
CM2
9,386.46
8,567.25
TJA
9,518.10
8,681.25
TSHU
6,586.72
5,969.25
WS1
3,465.84
3,454.25
SV2
6,808.75
6,169.25
CM3
3,255.34
3,249.25
SV3
4,730.81
4,624.25
UG3
5,603.05
5,244.25
UG1
8,707.49
7,979.25
LCWTKNG
8,024.54
7,359.25
CM1
4,526.34
4,449.25
UG4
9,486.91
8,654.25
TSGR
9,273.30
8,469.25
TJB
Well 14-16
14-168 Plan Q 89.25usft (rigx)
14-16B Plan @ 89.25usft (rigx)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP7
BAKER•■
HUGHES
6/20@017 9:58:44AM Page 10 COMPASS 50001 Build 81D
by BP rER
BP Well Plan Survey Report BAKER
HUGHES
Company:
Project
Site:
Well:
Wellbore:
Design:
Plan Annotations
North America - ALASKA - BP
Prudhoe Bay
PB DS 14
14-16
Plan 14-16B
14-168 wpO6a
Measured
Depth
(usftl
3,118.25
3,200.00
3,217.00
3,237.00
3,637.00
4,337.00
5,240.01
5,921.06
8,538.91
9,486.91
9,511.91
9,618.76
10,268.76
10,428.76
11,247.77
11,488.63
11,548.64
11,558.90
12,112.35
12,161.92
12,761.76
Vertical
Depth
lush)
3,115.17
3,195.20
3,211.81
3,231.34
3,810.59
4,278.49
5,005.19
5,453.66
7,831.53
8,654.25
8,675.90
8,765.25
8,916.63
8,850.50
8,667.86
8,669.10
8,669.25
8,669.20
8,664.25
8,664.28
8,670.25
Local Coordinates
•NI -S
•PJ -W
(usft)
(usft)
17.12
37.46
28.63
49.49
31.41
51.82
34.94
54.30
164.34
64.00
357.65
70.65
874.30
143.6(1
1,386.11
171.13
1,784.20
329.09
1,312.74
386.98
1,300.33
388.50
1,242.29
395.63
665.04
466.50
520.43
484.26
-104.49
923.30
-223.17
1,132.90
-251.37
1,185.88
-255.95
1,195.04
-503.18
1,690.17
-524.68
1,734.83
-776.97
2,279.00
Comment
TIP
KOP
Start 20.00 hold at 3217.00 MD
Start DLS 2.50 TFO 270.00
Start OILS 2.50 TFO 90.00
Start OILS 3.00 TFO -24.62
Start 681.05 hold at 5240.01 MD
Start DLS 3.00 TFO 174.88
Start 950.00 hold at 8536.91 MD
Start 25.00 hold at 9488.91 MD
Start Build 6.00
Start Build 12.00
Start 160.00 hold at 10268.76 MD
Start OILS 7.00 TFO -107.32
Start 240.86 hold at 11247.77 MD
Start DLS 5.00 TFO -84.39
Start DLS 5.00 TFO 0.00
Start 553.45 hold at 11558.90 MO
Start OILS 4.00 TFO -123.13
Start 599.84 hold at 12161.92 MD
TD at 12761.76
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 14-16
14-1 Be Plan @ 89.25usft (rigx)
14-16B Plan @ 89.25usft (rigx)
True
Minimum Curvature
EDM R5K- Alaska PROD - ANCP1
62012017 9:58:44AM Page 11 COMPASS 5000.1 Build 81D
Obp
North America - ALASKA - BP
Prudhoe Bay
PB DS 14
14-16
Plan 14-16B
14-16B wp06a
Anticollision Summary Report
20 June, 2017
BAKER
HUGHES
.Z bBP Was
pAnticollision Report BAKER
HUGHES
Company:
North America -ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 14
Site Error:
0.00usft
Reference Well:
14-16
Well Error:
o.Dousft
Reference Wellbore
Plan 14-16B
Reference Design:
14-16B wp06a
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 14-16
14-16B Plan @ 89.25usft (rigx)
14-16B Plan @ 89.25usft (rigx)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
14-168 wp06a
----��
Filter type:
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
WARNING: There is hidden tight data in this project
Interpolation Method:
MD Interval 100.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 1,471.47usft Error Surface:
Elliptical Conic
Survey Tool Program
Data 6/20/2017
----��
—
From
To
Wait)
(usft) Survey(Wellbore)
Tool Name
Description
118.25
3,118.25 1 : Camera based gyro multisho (14-16)
CB -GYRO -MS
Camera based gyro multishot
3,118.25
3,200.00 14-168 wp06a (Plan 14-168)
CB -GYRO -MS
Camera based gyro multishot
3,200.00
3,800.00 14-168 wp06a (Plan 14-16B)
INC+TREND
Inclinometer+ known azi trend
3,800.00
9,487.0014-16B wp06a(Plan 14-168)
MWD
MWD - Standard
3,800.00
9,487.0014-168 wp06a (Plan 14-168)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
9,487.00
10,700.00 14-16B wpD6a(Plan 14-168)
MWD
MWD - Standard
9,487.00
10,700.0014-16B wp06a(Plan 14-16B)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
10,700.00
12,761.7014-1613 wp08a(Plan 14-16B)
MWD
MWD -Standard
10,700.00
12,761.76 14-168 wp06a (Plan 14-16B)
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
612012017 10:06,49AM Page 2 of 4 COMPASS 5000.1 Build 810
:e►��SBP
pAnticollision Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well 14-16
Project:
Prudhoe Bay
ND Reference:
14168 Plan @ 89.25usft (ngx)
Reference Site:
PB DS 14
MD Reference:
14-168 Plan @ 89.25usft (ngx)
Site Error:
0.00usft
North Reference:
True
Reference Well:
14-16
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
Plan 14-168
Database:
EDM R5K-Alaska PROD -ANCP1
Reference Design:
14-16B wp06a
Offset ND Reference:
Offset Datum
FBI Fag
BAKER
HUGHES
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore- Design
(usft)
(usft)
(usft)
(usft)
PB DS 14
14-01 - 14-01 - 14-01
1,617.61
1,600.00
186.20
125.44
60.76
Pass- Minor 1/200
14 -01 -14 -01A -14-01A
1,622.42
1,600.00
186.17
125.35
60.82
Pass - Minor 1/200
14-02 - 14-02 - 14-02
4,035.97
4,100.00
362.20
217.42
172.71
Pass - Major Risk
14 -02 -14 -02A -14-02A
4,040.51
4,100.00
362.53
217.47
172.65
Pass -Major Risk
14-02 - 14-028 - 14-028
4,040.51
4,100.00
362.53
217.47
172.65
Pass - Major Risk
14 -02 -14 -02C -14-02C
4,038.73
4,100.00
362.40
217.45
172.67
Pass - Major Risk
14-02 - 14-02CL1 - 14-02CL1
4,038.73
4,100.00
362.40
217.45
172.67
Pass - Major Risk
14-03 - 14-03 - 14-03
3,335.62
3,400.00
97.21
37.27
60.14
•. Pass -Minor 1/200
14 -03 -14 -03A -14-03A --
3,335.62
3,400.00
97.21
37.27
60.14
- Minor 11200-
14-04 - 14-04 - 14-04
2,636.68
2,700.00
141.11
52.79
88.41
„Pass
Pass - Major Risk
14 -04 -14 -04A -14-04A
2,636.68
2,700.00
141.11
52.79
88.41
Pass - Major Risk
14-05 - 14-05 - 14-05
2,818.33
2,800.00
572.12
37.31
534.84
Pass - Major Risk
14 -05 -14 -05A -14-05A
2,816.33
2,800.00
572.12
37.31
534.84
Pass - Major Risk
14-12-14-12-14-12-
12,572.27
9,000.00
336.17
86.71
287.56
Pass -Minor 1/200 ,
14-13 - 14-13 - 14-13
2,818.25
2,800.00
359.56
41.66
317.98
Pass - Major Risk
14-14 - 14-14 - 14-14,
2,416.73
2,400.00
253.02
42.21
210.90
Pass - Major Risk
14-15 - 14-15-14-15
3,113.47
3,100.00
82.63
17.76
64.90
Pass -Minor 1/200
14-16-14-16-14-16
3,515.02
3,500.00
30.67
0.20
30.67
Pass-NOERRORS
14 -16 -14 -16A -14-16A
3,515.02
3,500.00
30.67
0.20
30.67
Paw -NOERRORS
14-16 - 14-16APB1 - 14-16AP81
3,515.02
3,500.00
30.67
0.20
30.67
Pass-NOERRORS
14-20 - 14-20 - 14-20
8,814.24
8,800.00
709.20
535.59
173.59
Pass - Major Risk
14-28 - 14-288 - 14-28B
11,200.00
9,000.00
734.92
142.71
590.74
Pass - Major Risk
14-29-14-29-14-29
12,184.68
9,100.00
959.15
285.72
677.65
Pass - Major Risk
14-31 - 14-31 - 14-31
6,564.72
5,900.00
816.68
377.43
688.01
Pass - Major Risk
14-35 - 14-35 - 14-35
4,992.36
4,800.00
272.30
222.56
50.05
Pass - Major Risk
1441 - 1441 -14-41
5,998.32
5,500.00
388.14
231.80
156.51
Pass - Major Risk
14-43 - 1443 .14-43
5,388.50
5,100.00
306.53
224.28
82.69
Pass - Major Risk
Plan 1445 - Plan 1445 - 1445 wp05
801.06
800.00
659.05
13.66
645A0
Pass - Major Risk
612012017 1O.06:49AM Page 3 of 4 COMPASS 5000.1 Build BID
:N#: b BP �/��
Zoi S p Anticollision Report BAKER
HUGHES
Company:
North America- ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 14
Site Error:
O.00usft
Reference Well:
14-16
Well Error:
O.00usft
Reference Wellbore
Plan 14-16B
Reference Design:
14-16B wpO6a
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 14-16
14-168 Plan @ 89.25usft (rigx)
14-16B Plan @ 89.25usft (rigx)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to 14-168 Plan @ 89.25usft (rigx) Coordinates are relative to: 14-16
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK
Central Meridian is 150° 0' 0.000 W - Grid Convergence at Surface is: 1.33°
Ladder Plot
-1- 14-01,14-01,14-01 V1
$ 14-01,14-01A,14-01AV1
�F 14-02,14-02,14-02 V6
$ 14-02,14-02A, 14-02A V4
f 14-02,14-02B, 14-028 V3
$ 14-02,14-02C, 14-02C V28
-t- 14-02,14-02CL1, u-o2CL1 V0
-t- 14-03,14-03,14-03 Vi
Measured Depth (2500 usWtn)
-f-- 14-04,14-04A, 14.04A V3
$ 14-05,14-05,14-05V1
$ 14-05,14-05A,14-05AV1
$ 14-12,14-12,14-12 V1
-rte 14-13,14-13,14-13V1
-)� 14-14,14-14,14-14 V2
-i- 14-15,14-15,14-15V1
-9- 14-16,14-16,14-16V1
$ 14-20,14-20,14-20 V1
-0- 14-28,14-288,14-28BVO
-X- 14-29,14-29,14-29 V1
$ 14-31,14-31,14-31 V1
-dr 14-35,14-35,14-35 V1
$ 14-41,14-41,14-41 Vl
$ 14-43,14-43,14-43 V1
$ Plan 1445, Plan 1445,1445wp05 VO
620/2017 10:06..49AM Page 4 of 4 COMPASS 5000.1 Build 81D
►
.re 311-0N SIBPo3 lin) ifipa ]]s5
'enl
Prefect P9051 Bay
♦♦
p ]AW
SIM: PB0514
_
HUGHES
Well: 14-16
X l 1]]
.1. 0.1
HO
WXB6ore: PMn14-168
s5oawdD6T.]Is
PM n:10.160 wPO6a fl &i sMbn 14168)
-.
r..
napPo iiam i
dm oPo .A.n
°Po
-
wF➢LD6nlle: lora
64-10 PI
�➢Sd
1
m
OIwN YM: `
1MId �W4V
XwNlry
a
FnytSy 3aWyy bnelaW Bp
anY Ono N]tlp].Tp i]6Rlf3p ]0'N'}}S]]Y 14}'6!'1.]6}0
PNNLOLLIBION✓£Ti1NG5 -
F IMfPolto MHIIW MD ftN.J: E.0,
DORanp ]WOW TOWWW
R aubtimtl1By CeMOUSlame 14]1.4]
Rehre a PLm 10. l5Bwpt8anN8.PYn 4-1891
14-03114-03/14-03
i./ 2D
100
80
06 60
40A 1
\
a�5 o 63
-
.re 311-0N SIBPo3 lin) ifipa ]]s5
'enl
40
3
p ]AW
BAKER
60
HUGHES
X l 1]]
.1. 0.1
HO
_ _-- -
.-&o
s5oawdD6T.]Is
MO R
r..
napPo iiam i
dm oPo .A.n
°Po
100
64-10 PI
�➢Sd
1
m
120
/
240
200
140
eo]aa
BWO
liwa w.m
l azuo
160
)4-1
w
1B Iill3]9 W.
Po Ofip]il 16160 imee138
I OOOD
v 1M. 114➢1 wmii inn] mam
om nom iiv3.Pow laraenmise
1OOD
180
10W
200
1300
21 220
0
240
160
Azimuth from North [°] vs Centre to Centre Separation [25 usftlin]
oaM'. 201&0MMO 000 NN6]Ietl Y. Va
Dcp Flom
UiM To B wry man Tool
125
25
3110 i'. CameMagy
Eomi6LpyR0488
311818
.25
3300wgle
00 14-168e(ganl.l6 YR"S
3'300.0,
380000 14-168w 8(PMnl4IMMTREND
38N.00
M7.00 14-18Bx1:Wa(Mn10.168) MWO
380.00
M7-00 14-168 wµr9a(gen 10.1601 MWD,IFRiM3MO
8462.00
10]00.00 10.1S9wpWa(A-14-1613) MWD
8M.00
!020.00
ID]0000 14-1613wMa(Man14168) MM.Wy�� 6ft�MSMOCA
2781.20
1020.00
14-teBwr06a (Ppn10.1881 MWD
1328118 14-16B wF a(% 14168) "011FRaM"MA
-
.re 311-0N SIBPo3 lin) ifipa ]]s5
'enl
-
Fed b9
p ]AW
BAKER
11ID
5310n1 I]➢] Pom9
HUGHES
X l 1]]
.1. 0.1
ODM .SI�SPo])
_ _-- -
.-&o
s5oawdD6T.]Is
MO R
r..
napPo iiam i
dm oPo .A.n
°Po
64-10 PI
�➢Sd
From Cdov ToMD �]]] ] alq]o !So n5]E
50D
6000
2WO
800
900
1WW
00
200
14-16/14-16MWUS ,1 ,a1
%0
0 45
30
40
35 \30, D
��/ 25 '. ABO
20
15
\\ ]
14.168 wpo6a 10
210 ."11$x368�X 90
�96fi 135]5 25 ]
10
14P16/14 1�*Moyb_t
15
20 14 1,/14-iM14-16A
40\ 25 /
\\ �20
30 /
35
40
210 45 160
50
180
Azimuth from North [e] vs Centre to Centre Separation [8 usfttin]
.re 311-0N SIBPo3 lin) ifipa ]]s5
'enl
}4N Y'] eamm
t Polo
p ]AW
11ID
5310n1 I]➢] Pom9
?W IBIM
NPo
X l 1]]
.1. 0.1
ODM .SI�SPo])
'oN
r]iW ]e]fllsi
�l
;q e'ii ".,m'y
I"
dm oPo .A.n
°Po
lOM n4nl wm n1. oI. esu
1
m
600
aeM flail lAno smm wb
om
200
5 ]]ices] m i �1aii a
ii
eo]aa
BWO
liwa w.m
l azuo
u6nN.os
9000
w
1B Iill3]9 W.
Po Ofip]il 16160 imee138
I OOOD
v 1M. 114➢1 wmii inn] mam
om nom iiv3.Pow laraenmise
1OOD
10W
1300
14-16/14-16MWUS ,1 ,a1
%0
0 45
30
40
35 \30, D
��/ 25 '. ABO
20
15
\\ ]
14.168 wpo6a 10
210 ."11$x368�X 90
�96fi 135]5 25 ]
10
14P16/14 1�*Moyb_t
15
20 14 1,/14-iM14-16A
40\ 25 /
\\ �20
30 /
35
40
210 45 160
50
180
Azimuth from North [e] vs Centre to Centre Separation [8 usfttin]
1— PrpS t Peay f ANhLoul9T11NG
oM SEs
S IN, SM. Pe ODDS1l.
Web 1415 ImelwlYon Akui a NP I al: 25.00
_LI oOpNR rpeF 6000D0 mtz-2 )6ti
llt
Weprc Plan14468 q MU..B3 Cimlmo i101.0
PMnF81mmNS Plan
14186 vg06 �i4164]tgn td -165
WELLOETPILa'. 1N6
Gmmo
file 6.
.MIS rE0y1 MaMlnp Emom. d1.ip IyMUY
bryILY Op
p.pp p.pp 6..9383.1.. 6]6]]3680 i0.143]]Py 100'06'1.]66.. FIOm Lgoul is MO ]S4nB 139 N61 ]IGSep 3Bq Ni I9p •E]p ]V]
] =M I3M X.16 R ]IA1 SIB] f3[p ])p.W ])H$
5 L9M IBB
p 1NM iM mm �z.Y
3118 3800 a °W,nyM .96F Ilei N]e.Y >nm ious w �� by
Y Um
240 3800 1000 6 e 1M wood ]m sav9e nX.0 ,i1.n pM d
B W 1 9]M )0]15] 1] <1p ABMY ]M 1)ib6 SA
0 y
220 0 4000 4500 m,iie mm 1llia 0 luso pM exx IaYeiy.l1B
mll
200 \ , 4300 5000 ] 1. 11"'iolil naafi a �� iX�sp .o,
,1 5000 MW 4 1 ].).6' nut 1imW Ym �i loo i»M
180 1011,10 B u4Y " ezz , n ° mo v
1000 6000 1i IISXM M51 11863 eewd, y65% 1 WB]] 10.1BBL�PYB
60 i :Iz,;,]6 Mut , X BY. ,61Y I.41M].TLb
B3 Y li ,gym '
•\ 3Y1 RR116 YU IIBbI 1035 .9eW ] 1616pAgv15b
140 \ 10000 11000 M
120 � � 11000 12000 P1°m opp B
100 12000 130M
A
/1a43 wpO6a —
/ 6400,60 Ta'12761.76 460
0
20 `
210 90 _" ..� ..w..
i20 ; �... .. .... ... .,.
40
50
100 330 45
30
120 ' / 40
2
0 120 35
��
300. 30
60 80
5
180 20
200
20
0 10150
240 210 90
5
ISO
0
Azimuth from North['] vs Centre to Centre Separation [25 usfUin] ,5
SURVEY I..D
FR
20
Dow 2. Sm.F4 iw9.90 vYYXr re vers]pn 240\ 25
PoOIp /
From m Dei 9 ry) 1 � 120
30
11926 3tte16 1-C Yeagym mUf6WM94.1eB
3219.15 32.000 14169 wPC60�%en 14-16$GYgpM6 35
32..00 390.00 14-269w6C60 %an 14-1S6},IR MW
3800.w 84.]00 14A6Bw�fi0 Flan 14168) MWD 40
3800,69 BdB100 14-186 WeU6e PWn14165� Afi4Yl,IFq.M6 OCA
SM100 1..00.00 14-0BSwpO6al%an 14-16. MWO 210 45 150
9491.00 1010..00 14-IB9wp0501%an 10.165 MWppIFq�N$WOLR
10100.00 12161.10 14t65wpWa�%an 14-165) MWD
10]00.00 12161.18 MW➢HFfl.MS�WOCA 180
Azimuth from North [p] vs Centre to Centre Separation [8 usfUin]
BAKER
HUGHES
— —
BECIOXpk1NL6
rc
lF i qM
II ]5 ] qyp Moil
]].13 ]).i5 W 1B.g
p.pp p.pp 6..9383.1.. 6]6]]3680 i0.143]]Py 100'06'1.]66.. FIOm Lgoul is MO ]S4nB 139 N61 ]IGSep 3Bq Ni I9p •E]p ]V]
] =M I3M X.16 R ]IA1 SIB] f3[p ])p.W ])H$
5 L9M IBB
p 1NM iM mm �z.Y
3118 3800 a °W,nyM .96F Ilei N]e.Y >nm ious w �� by
Y Um
240 3800 1000 6 e 1M wood ]m sav9e nX.0 ,i1.n pM d
B W 1 9]M )0]15] 1] <1p ABMY ]M 1)ib6 SA
0 y
220 0 4000 4500 m,iie mm 1llia 0 luso pM exx IaYeiy.l1B
mll
200 \ , 4300 5000 ] 1. 11"'iolil naafi a �� iX�sp .o,
,1 5000 MW 4 1 ].).6' nut 1imW Ym �i loo i»M
180 1011,10 B u4Y " ezz , n ° mo v
1000 6000 1i IISXM M51 11863 eewd, y65% 1 WB]] 10.1BBL�PYB
60 i :Iz,;,]6 Mut , X BY. ,61Y I.41M].TLb
B3 Y li ,gym '
•\ 3Y1 RR116 YU IIBbI 1035 .9eW ] 1616pAgv15b
140 \ 10000 11000 M
120 � � 11000 12000 P1°m opp B
100 12000 130M
A
/1a43 wpO6a —
/ 6400,60 Ta'12761.76 460
0
20 `
210 90 _" ..� ..w..
i20 ; �... .. .... ... .,.
40
50
100 330 45
30
120 ' / 40
2
0 120 35
��
300. 30
60 80
5
180 20
200
20
0 10150
240 210 90
5
ISO
0
Azimuth from North['] vs Centre to Centre Separation [25 usfUin] ,5
SURVEY I..D
FR
20
Dow 2. Sm.F4 iw9.90 vYYXr re vers]pn 240\ 25
PoOIp /
From m Dei 9 ry) 1 � 120
30
11926 3tte16 1-C Yeagym mUf6WM94.1eB
3219.15 32.000 14169 wPC60�%en 14-16$GYgpM6 35
32..00 390.00 14-269w6C60 %an 14-1S6},IR MW
3800.w 84.]00 14A6Bw�fi0 Flan 14168) MWD 40
3800,69 BdB100 14-186 WeU6e PWn14165� Afi4Yl,IFq.M6 OCA
SM100 1..00.00 14-0BSwpO6al%an 14-16. MWO 210 45 150
9491.00 1010..00 14-IB9wp0501%an 10.165 MWppIFq�N$WOLR
10100.00 12161.10 14t65wpWa�%an 14-165) MWD
10]00.00 12161.18 MW➢HFfl.MS�WOCA 180
Azimuth from North [p] vs Centre to Centre Separation [8 usfUin]
Obp
Plalecl: Paudhole,1eXPi kFWMjaj WEL1HOnE DETNL6: PI0n 10.15a RFF.tlILEHapxalYM! .r.■
501. Pa 0510 (z From --'- --
wn:1a1s 4071¢%. Porem W¢IWLb: 1416 eooNnW IN£IReb�ene'wulw6 nu NM
Wembon: Phn1a16BywTI¢OIIMD:311825 VetiWINORekrtrce 1616BPon®69.y'Iglpyl BAKER
seo DNA8xu,rce S'a lo00N4.0CE3 HU6MES
P{an:1a16awP0h11a16MYn 14'1681 11Y. N.muee VepN 616100. 1H60Pon0®SSullppl
- [9eJam 6tmof A5nullgrvwe
27U1'
2{111 11-11�B G[o-Wlryon
m
c IX1w
w
lion
O
IAN
+ Wn
0
4w
-mu
um aun aul
2507.
Nil.&,""
K LL DETAILS 14-16
300.
TIP
1250:
ADP9V151.0
Gold Level
42.10
40p0
Ix/5 -E. lbMllq
Eae0n0
1100001
LonpNtle Sql
31ulULS 11p TPO�24112521610731
OPo Mw%39$13.]. 6]53736. 70-14
]S177111,6'35'1368.
SMDL$]WTFO{'14
Xxcm,
SEC710NDBTARS
SwxDLS{IIOiPO-Id1DC
'CM2 n 9uIW6AV
fie' MD IW AS WD
107-5"
M¢9
�I
WAS, V9el Ta9M
SIYp DL3'I. NTFO-111732]X07-
311
1 x9 11,25 4fl00 311517
17.12 37.46
O.W
SIX 9,35
2 3MDD 12.27 4.67 319510
2063. 4949
1.50
,m 38,72
cwxDDETnLs
3 3217.. 124 3516 321181
31.41 51.82
1200
MOO 3755
_1w
4 3237-M 124 35.16 391.34
34.94 5A33
DAO
OW ND7
sue
MD31es.zo
5 3x17.00 19.39 343.94 WaS
aa,M 64.00
250
27QW -291
3004.. e6zs
ess4 zs 04¢111 7..
fi 43'f7.00 MN 17.67 427&49
357.8 ]Q&
250
90.00 55.93
e670.zs1n51.7s 45.
7 5290.01 48.61 107 50..19
674.30 MISS
3.00
24.62 46401 1
8 541.46 48,81 3.07 5.,66
1386,11 171.13
0.00
0.00 JIa27
9 8536.91 30.00 1730D 7831.53
178420 Mal
300
174.68 500.99
_...
10 San 30.00 MOD 884.9
131274 386..
0.00
0.00 a9 14168TWSM1.6
11 9511.91 3000 173.00 .7553
mm 38660
0.00
DOD -79.67
12 9618.76 36.41 17300 8789
1242.9 SEEM
6.W
0.00 53.12
13 1026&9114.41 IaOO 991563
68.04 4655D
12W
Do 210.91
14 1012176 114.41 I73.W Si
59.M 484.26
000
ODD T77A6
1511247.77 89.71 119.4 SWISS
-104.49 99.30
7,07
40792 DOW
16 11Mx4 89,71 119.4 MID
-29,17 113290
OW
DOD 1140.00
1711546.69 W.W 116.4 8SSUR9
'91.37 11MM
507
&1.911,1032 14-16STag613.6 I
IS 11555. 0751 11553 S6W9
-28.07 119504
ADD
O.W 1210.51
19 1211235 0701 116.53 8664,25
500,18 1690.17
O.W
000 17.,34 1416BTW;,S141
20 12161.92 6943 114.87 SDALM
Xffi T 3 M17
COS
-19.13 1809.66
21 12761.76 8943 114.87 SEISS
.776.97 2279.
OM
O.W 2407.30 14169TB1EI
27U1'
2{111 11-11�B G[o-Wlryon
m
c IX1w
w
lion
O
IAN
+ Wn
0
4w
-mu
um aun aul
2507.
Nil.&,""
300.
TIP
1250:
ADP9V151.0
61nx Dli40TP027100
40p0
9Le1DLS25VTPO0uuu{550
UC4{5W5pN0
31ulULS 11p TPO�24112521610731
SMDL$]WTFO{'14
Xxcm,
SwxDLS{IIOiPO-Id1DC
'CM2 n 9uIW6AV
61un Dulld l?Illl SLV DI.S 5.411 TFO-X{39
p ]bN
SWI DID 51qTF00011
CMI
SIYp DL3'I. NTFO-111732]X07-
_
__ _ TD 112761ICUZ
m0YSOV
'.
9119) TCGLlpr1tMd1
a e" 14.169 T11X[I36 a •.
975.- II-I6aT."16
ILI6BTur9il26 �'u1 '� 14-I611T 61106 14 1613f., 56
An_
a Ip to
LI61 -0511 JW -1111 V INI
SW 450 61X1 750 M 1050 12M 1150 1507 1450 ISM 1950 2iW 2NI 2407 25% 270(1 29% 111,
Vertical Section at 110.000 (150 usf tin) -
-lfiB ruXne 6
I{'16BT,1l,Iv6
V H-RiBLu X tic
I{-I.firmsasl.
m�
414..
]lel Wu 9 1211 181.IW 2{07 271X1 3111A 33111 36111
Wesl11 66
(-)/East(+) (300 us/in)
ANNDTATONS _
TVD MO MWBbx
311517 369.9 TP
3195.9 32WA0 NOP
3211.61 U17M SWWADWMA13217A ND
3231.34 397.45 SIMDL6250702MOD
361059 307A0 8
WDLS2WTFO9D0D
422649 4337.. SWDL53.WTFO-24.G2
W05.19 52MAI SUxfi8I A56Wa152M41 MD
5453.66 541A6 SISIDLS3.00TF017486
763153 8536.91 SW 968A0hcaat&536.91 M0
665425 9486.91 SW2SXh*,194862IW
8fi75 SID 951181 SbDihil
8765.25 95181 Sled806,12.07
89166310068.76 SWiWDOWMa110268,MMD 1
8850.50 10028.76 SWOLS7.0070-10.32
865]86 1124177 SW240.86MM911247.77M0
III IIM653 SWDLS5.WTFOA4.39
8fifi925115Mbd SWOLS5.0OP00,00
68692011568.. SW54.d5Mtlat 1155850,0
665025 12112.35 SWDLSSMUO-12313
86611512161.92 SW599NWI111216152MD
867025 12761.76 TDIS12781.76
61, FROGRgM
DISIWI"TW'MW VaXdaWY65 Vnsg,'.
Dl F. W*T. 9ureYl%al Tml
Ilex 311625 1C.M'ee¢a9Fo^nemnFMlA$
311635 =in taI6B¢pDW(%s 1a1CB[.YRO#AS
RD3f0 Sell MISS.p96aIFlm141661 165 -TREND
YWAO Ni 1a168w00m141681 MWS
MA RVA 14168wpO5aIM161661 MNDAFR.MGWSG
MAM 1070000 1al6BUouil(tm161661 MVD
918700 10MM 1416ewpO6af%m Ia1EH1 WDAFRAO&WpJ1
107MM 121 ia16Bry06a Rn141661 MVD
10i EMILIE 14-16BwXlArMn1416% MNDxiPr1.6WOG
2'N~:
zb
p
North America - ALASKA - BP
Prudhoe Bay
PB DS 14
14-16
Plan 14-16B
wp06a plus 500' MD
AOGCC Offset Well Report
20 June, 2017
BP
`e by Anticollision Report BAKER
HUGHES
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 14
Site Error:
O.00usft
Reference Well:
14-16
Well Error:
O.00usft
Reference Wellbore
Plan 14-16B
Reference Design:
wp06a plus 500' MD
Reference wpO6a plus 500' MD
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 14-16
14-16B Plan Q 89.25usft (rigx)
14-16B Plan Q 89.25usft (rigx)
True
Minimum Curvature
1.00 sigma
EDM R5K -Alaska PROD - ANCP1
Offset Datum
Filter type:
NO GLOBAL FILTER: Using user defined selection S filtering criteria
WARNING: There is hidden tight data in this project
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
3,000.00 to 13,261.76usft Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 200.00usft Error Surface:
Elliptical Conic
Survey Tool Program Date 6/20/2017
From To
(usft) (usft) Survey (Wellbore)
118.25
3,118.25 1 : Camera based gyro multisho (14-16)
3,118.25
3,200.00 wp06a plus 500' MD (Plan 14-16B)
3,200.00
3,800.00 wpO6a plus 500' MD (Plan 14-16B)
3,800.00
9,487.00 wp06a plus 500' MO (Plan 14-16B)
3,800.00
9,487.00 wp06a plus 500' MD (Plan 14-16B)
9,487.00
10,700.00 wp06a plus 500' MD (Plan 14-16B)
9,487.00
10,700.00 wpO6a plus 500' MD (Plan 14-16B)
10,700.00
12,761.70 wp06a plus 500' MD (Plan 14-16B)
10,700.00
13,261.76 wp06a plus 500' MD (Plan 14-168)
Tool Name Description
CB -GYRO -MS
Camera based gyro multishot
CB -GYRO -MS
Camera based gyro multishot
INC+TREND
Inclinometer + known azi trend
MWD
MWD -Standard
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
MWD
MWD -Standard
MWD+IFR+MS-WOCA
MWD +IFIR +Multi Station W/O Crustal
MWD
MWD -Standard
MWD+IFR+MS-WOCA
MWD +IFR+Multi Station W/O Crustal
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
PB DS 14
14-03 - 14-03 - 14-03
3,482.23
3,550.00
112.45
14-03 - 14-03A - 14-03A
3,482.23
3,550.00
112.45
14-15 -14-15 - 14-15
3,563.07
3,575.00
146.87
14-16 - 14-16 - 14-16
3,797.16
3,800.00
109.64
14-16 - 14 -16A -14-16A
3,797.16
3,800.00
109.64
14-16 - 14-16APB1 - 14-16AP81
3,797.16
3,800.00
109.64
14-16 - Plan 14-16B - 14-16B wpO6a
8,425.00
8,425.00
0.00
6/2012017 11:48:42AM Page 2 of 18 COMPASS 5000.1 Build 81D
�
§
� | !
S�/� \ � �\\� � §z<■� {|�
|
Loepp, Victoria T (DOA)
From: Sperry, Nathan <Nathan.Sperry@bp.com>
Sent: Monday, July 17, 2017 11:07 AM
To: Loepp, Victoria T (DOA)
Cc: Lastufka, Joseph N
Subject: RE: PBU 14-16B(PTD 217-093) Anti -collision
Good morning Victoria,
The results should be available no later than 1 month from now (hopefully sooner).
Regards,
Nathan Sperry
Drilling Engineer
0:(907)268-8416
0:(907)564-4258
From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.gov]
Sent: Monday, July 17, 2017 10:37 AM
To: Sperry, Nathan <Nathan.Sperry@bp.com>
Subject: RE: PBU 14-16B(PTD 217-093) Anti -collision
Nathan,
When will these gyros be run and the results available?
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria. Loeoo(dalaska.00v
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 oryicforia.Loeoo@alaska gov
From: Sperry, Nathan [mailto:Nathan.Sperry@bp.com]
Sent: Monday, July 10, 2017 4:32 PM
To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>
Subject: RE: PBU 14-16B(PTD 217-093) Anti -collision
Hi Victoria,
We plan to run a gyro in each offset well in order to reduce the positional uncertainty of the wells. Once we have the
gyro results, we will re -calculate the anticollision to see if it passes.
If the AC does not pass after the gyro's, the following will apply:
14-01 (and sidetrack) — Will have a plug set below the potential collision depth. This well is an operable injector that is
online.
14-03 (and sidetrack) - Will have a plug set below the potential collision depth. This well is a non-operable producer that
is shut-in.
14-05A—This well passes major risk.
14-12 - Will be shut in at surface and a collision in the reservoir will not pose an HSSE risk. This well is operable but is
currently shut-in.
14-15 — Will have a plug set below the potential collision depth. This well is an operable producer that is online.
Please let me know if you need any additional information
Regards,
Nathan Sperry
Drilling Engineer
C: (907) 268-8416
0:(907)564-4258
From: Loepp, Victoria T (DOA) [mailto:victoria.loepr)@alaska gov)
Sent: Friday, July 7, 2017 10:55 AM
To: Sperry, Nathan <Nathan.5oerry bo.com>
Subject: PBU 14-16B(PTD 217-093) Anti -collision
Nathan,
PBU 14-01, 14-01A, 14-03, 14-03A, 14-05A, 14-15 are minor risked. Please outline their status how they will be secured
to mitigate risk.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria LoeooCo7alaska oov
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete if, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)7931247 or Mona.[ oeppsalaska aov
Davies, Stephen F (DOA)
From: Sperry, Nathan <Nathan.Sperry@bp.com>
Sent: Monday, June 26, 2017 7:46 AM
To: Davies, Stephen F (DOA)
Subject: RE: PBU 14-16B (PTD #217-093) - Question
Steve,
When we perform our weight up to 10.4ppg, we will perform that prior to the CM1 (^'8,024' MD). I see that the table on
page 4 has the 10.4ppg MW beginning at 8,556' MD. I apologize for the error.
Regards,
Nathan Sperry
Drilling Engineer
C: (907) 268-8416
O: (907) 564-4258
From: Davies, Stephen F (DOA)[mailto:steve.davies@alaska.gov]
Sent: Friday, June 23, 2017 5:09 PM
To: Sperry, Nathan <Nathan.Sperry@bp.com>
Subject: PBU 14-16B (PTD #217-093) - Question
Nathan,
I'm reviewing BP Permit to Drill for PBU 14-16B, and I have a quick question for you. In general, planned mud weights
appear adequate to control the BP's forecast of estimated pore pressures. However, a static mud weight of 9.8 seems a
bit underbalanced in CM1 and HRZ intervals which are estimated at 10.0 ppg. Does BP have concerns about drilling
these intervals with 9.8 ppg mud?
Thanks,
Steve Davies
Senior Petroleum Geologist
AOGCC
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential
and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If
you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware
of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies(aalaska.eov.
TRANSMITTAL LETTER CHECKLIST
WELL NAME:
PTD: 7'-3
Development _ Service _ Exploratory _ Stratigraphic Test —Non -Conventional
FIELD: G POOL:1(c[�
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. , API No. 50-- -
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69)
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50—
from from records, data and logs acquired for well
(name onpermit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
sam les are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
PTD#:2170930
Adminis
Appr
SFD
Engines
Appr
VTL
Geology
Appr
SFD
CHECKLIST
-640150
(ration 17 Nonconven. gas conforms to HJ31.u0,U3u(I•1.A),ll.L.8-V) _ 14�
1 Permit fee attached _ _ _ _ _ _ _ _ _ _ _ NA
2 Lease number appropriate _ _ _ _ _ Yes
3 Unique well name and number _ _ _ _ Yes
4 Well located in. a defined. pool _ _ _ _ Yes
5 Well located proper distance from drilling unit boundary _ Yes
6 Well located proper distance from other wells. Yes
7 Sufficient acreage. available in drilling unit Yes
8 If deviated, is wellbore plat. included _ _ Yes
9 Operator only affected party..... Yes
10 Operator has appropriate bond in force Yes
Date 11 Permit can be issued without conservation order Yes
12 Permit can be issued without administrative. approval Yes
6/23/2017 13 Can permit be approved before 15 -day wail. _ Yes
14 Well located within area and. strata authorized by Injection Order # (put 10# in comments) (For NA
15 All wells. within 1/4 mile area of review identified (For service well only).. NA
16 Pre -produced injector; duration of pre -production less than 3 months (For service well only) NA
18 Conductor string_ provided NA
ring 19 Surface casing. protects all known USDWs NA
20 CMT vol adequate to circulate on conductor & surf csg NA
21 CMT vol adequate to tie-in long string to. surf csg NA
22 CMT.will cover all known productive horizons_ Yes
23 Casing designs adequate for C, T. B &. permafrost Yes
24 Adequate tankage or reserve pit Yes
25 If a re -drill, has a 10-403 for abandonment been approved Yes
26 Adequate wellbore separation proposed Yes
27 If diverter required, does it meet regulations NA
Date 28 Drilling fluid program schematic & equip list adequate Yes
7/7/2017 29 BOPEs,.do they meet regulation Yes
30 BOPE. press rating appropriate; test to (put psig in comments) Yes
31 Choke. manifold complies w/API. RP -53 (May 84) Yes
32 Work will occur without operation shutdown Yes
33 Is presence of H2S gas probable Yes
34 Mechanical condition of wells within AOR verified (For service well only) NA
35 Permit can be issued w/o hydrogen sulfide measures No
36 Data presented on potential overpressure zones Yes
Date 37 Seismic analysis of shallow gas. zones NA
6/26/2017 38 Seabed condition survey (if off -shore) _ NA
39 Contact name/phone for weekly. progress reports. [exploratory only) NA
Geologic Engineering Public
Commissioner: Date: �C �` missioner• Date Comm. io r% Date
Well Name: PRUDHOE.RAY UNIT 14-168 Program R6V Well bore seg ❑
-V / PEND GeoArea 890 Unit 11650 On/Off Shore Or_._ _. Annular Disposal ❑
Entire Well lies within ADL0028312..
PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341F
CO 341 F, Rule 2:_ There shall be no restrictions as to well spacing. except that no pay shall be
opened in a well closer than 500 feet to the boundary of the. affected area. Planned. well conforms to CO
341F, Rule 2.
Conductor set in PBU 14-16
Surface casing set in PBU 14-16.
Surface casing set and fully cemented
Productive interval will be completed with cemented liner and perforated
Rig has steel tanks; all waste. to approved disposal wells
PTD 197-167, Sundry 317-255 _
Anti -collision analysis complete; 14-01, 14-03A, 14-12&14-15 fail major risk; gyros to be run. before drilling
Max formation pressure is 3244 psig(7.22 ppg.EMW ); will drill w/ 9,6-1.1.0 ppg EMW
MPSP is 2379 psig; will test BOPS to 3500 psig
H2S measures required
DS 14 wells are H2S-bearing. H2S measures are required.
6/26117: Revised mud weights appear adequate to control. the operator's forecast of estimated
pore pressures.Should higher pore pressures be encountered, BP has immediate access
to nearby fluid. mixing facilities. _
Geologic Engineering Public
Commissioner: Date: �C �` missioner• Date Comm. io r% Date
Well Name: PRUDHOE.RAY UNIT 14-168 Program R6V Well bore seg ❑
-V / PEND GeoArea 890 Unit 11650 On/Off Shore Or_._ _. Annular Disposal ❑
Entire Well lies within ADL0028312..
PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341F
CO 341 F, Rule 2:_ There shall be no restrictions as to well spacing. except that no pay shall be
opened in a well closer than 500 feet to the boundary of the. affected area. Planned. well conforms to CO
341F, Rule 2.
Conductor set in PBU 14-16
Surface casing set in PBU 14-16.
Surface casing set and fully cemented
Productive interval will be completed with cemented liner and perforated
Rig has steel tanks; all waste. to approved disposal wells
PTD 197-167, Sundry 317-255 _
Anti -collision analysis complete; 14-01, 14-03A, 14-12&14-15 fail major risk; gyros to be run. before drilling
Max formation pressure is 3244 psig(7.22 ppg.EMW ); will drill w/ 9,6-1.1.0 ppg EMW
MPSP is 2379 psig; will test BOPS to 3500 psig
H2S measures required
DS 14 wells are H2S-bearing. H2S measures are required.
6/26117: Revised mud weights appear adequate to control. the operator's forecast of estimated
pore pressures.Should higher pore pressures be encountered, BP has immediate access
to nearby fluid. mixing facilities. _