Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout217-098STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
RECEIVE®
1. Operations Performed'Luli
Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑
Pull Tubing ❑ Opera' n dow
❑
Suspend ❑ Perforate ❑ Other Stimulate ❑
Alter Casing ❑ ChanA ry
❑
Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑
Re-enter Susp Well ❑ Other: Nitrite Squeeze Trial
0
1-12S Inhibition
2. Operator Name: BP Exploration (Alaska), Inc
4. Well Class Before Work
Development 0
Exploratory ❑
S. Permit to Drill Number. 217-098
3. Address: P.O. Box 196612 Anchorage,
AK 99519-6612
1 Stratigraphic ❑
Service ❑
1 6. API Number: 50-029-22210-01-00
7. Property Designation (Lease Number): ADL 028325
8.
Well Name and Number: PBU 04.38A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10.
Field/Pools:
PRUDHOE BAY. PRUDHOE OIL
11. Present Well Condition Summary:
Total Depth: measured 10069 feet Plugs
measured None feet
true vertical 8722 feet Junkmeasuretl
8762 feet
Effective Depth: measured 9992 feet Packer
measured 5354, 6575 feet
true vertical 8741 feet Packer true
vertical 5353, 6572 feet
Casing: Length: Size: MD:
TVD: Burst: Collapse:
Conductor 78 20" 34-112
34-112 1490 470
Surface 3460 10-3/4" 34-3494
34-3493 3580 2090
Intermediate 8500 7-5/8" 31-8531
31-8488 6890 4790
Scab Liner 3205 5-1/2" x 3-1/2" 5418-8623
5416-8579 7740/10160 6280 / 10530
Liner 410 5-1/2" 8213-8623
8176-8579 7740 6280
Liner 1500 2-3/8" 8526-10026
8483-8733 11199 11776
Perforation Depth: Measured depth: 8940-9708 feet
True vertical depth: 8784-8794 feet
Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# x 3-1/2" 9.3#, 13Cr80
31 -6630 31 -6627
4-1/2" Baker SABL-3 Packer
5354 5353
Packers and SSSV (type, measured and 3-1/2" Baker SABL-3 Packer
6575 6572
two vertical depth)
4-1/2" Carrico TRCF SCSSSV
2170 2170
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
227
4256
5124
1674
261
Subsequent to operation:
166
3816
4632
1619
259
14. Attachments: (required per 20 Mc 25.070.25.071, &25,283)
15. Well Class after work:
Daily Report of Well Operations D
Exploratory ❑ Development
❑ Service 0 Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work:
Oil 0 Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑ 1
GSTOR ❑ WINJ ❑
WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Sundry Number or N/A if C.O. Exempt:
319-409
Authorized Name: Sidoti, Todd
Contact Name: Sidoti, Todd
Authorized Title: Well Intervention Engineer
Contact Email: Todd.Sidoti@bp.cem
Authorized Signature: Date: I t Contact Phone: +1 907 564 5113
Form 10-404 Revised 04/2017 �/f I,,iI K4r-V-+L?��r7 3BDMS L4r^'NOV 2 2 2ot9 Submit Onginal Only
Daily Report of Well Operations
PBU 04-38A
ACTI V ITYDATF m 111ARA A ev
T/1/0=300/1400/240 Temp= Hot **Well flowing on arrival** (LRS Unit 76- Sodium Nitrite Treatment)
Freeze protected FL with 3 bbls 60/40 and 85 bbls crude. Started down TBG with 5 bbls 60/40
10/25/2019
followed by 455 bbls of FW with Sodium Nitrite ***Continued on 10/26/2019 WSR***
***Continued from 10/25/19*** (LRS unit 76 - Sodium Nitrite Treatment) Continued pumping 125
bbls of FW with sodium nitrite down TBG (580 bbls total) Over flushed TBG with 700 bbls 1% KCL.
Freeze protected TBG with 40 bbls crude. RDMO. DSO notified of well status upon LRS departure.
10/26/2019
Swab, WV=Shut. SSV, MV, IA, OA=O en. AL=Shut. FWHP= 0/1160/30
WELLHEAD
FMC
ACRIATOR
TYPE
OKB. ELEV;
53
REF ELEV =
53'
BF- BEV =
20.98'
KOP=
7100'
Max Angle = 105' @ 10043'
Datum MD=
N'A
Datum TVD=
8800'SS
20- CONDUCTOR
91.51!, HdO,
D =19.124"
1 1 u-3/4- CSG, 45.59, J-55, D = 9.953' 1—t_3494'
Minimum ID = 1.781" @ 8534'
R NIPPLE IN UP w/PTSA
4-112" TBG, 12.6#, 13CR-80 NSCT, 5405'
.0152 bpf, D = 3.958'
TOP OF 5-112' X 3-1/2' SCAB LNR --F6409'
11
LNR-SCAB, 9.2#,
bpf, D = 2.992"
4-12" CAM TRCF SSSV NP, D = 3.812"
LOGGED OUT (08125/08)
GAS LFT MANDRD-S
3-12" TBG, 9.3#, 13CR-80 FOX,
6622' -
TYPE
.0087 bpf, D = 2.992'
LATCH
PORT
DATE
6195'
5-12" SCAB LNR 170, NT80S NSCC
.0232 bpf, D = 4.892'
-KBMG
-KBMG
LNR-SCAB, 9.2#,
bpf, D = 2.992"
4-12" CAM TRCF SSSV NP, D = 3.812"
LOGGED OUT (08125/08)
GAS LFT MANDRD-S
6346' 7-5/e' X 4-12' BKR SABL-3 I
5405' 4-12" X 3-12' XO. D = 2.81'
(PLUG WILL BETIGHi)
5-1/2'X 3-12' BKR S-3
3-12" HES XN NP MLLE
D = 2.87'
8526' -13-12' KB LTPw/N. SOLUTIONS PISA
NP @ 8534', D = 1.781' (1028117)
s.875" 8631'
8532' 2.70' SEALBORE DEPLOY SLV, D=225
MILLOUT WINDOW (04-38A) 8623'-8632'
PERFORATION SLAM f?f
DATE REV BY COMMENTS
TYPE
VLV
LATCH
PORT
DATE
ffl�370(0
MW799
Opn/Sgz
-KBMG
-KBMG
DOME
SO
BK
BK
i6
24
04/24/17
05/20/18
6346' 7-5/e' X 4-12' BKR SABL-3 I
5405' 4-12" X 3-12' XO. D = 2.81'
(PLUG WILL BETIGHi)
5-1/2'X 3-12' BKR S-3
3-12" HES XN NP MLLE
D = 2.87'
8526' -13-12' KB LTPw/N. SOLUTIONS PISA
NP @ 8534', D = 1.781' (1028117)
s.875" 8631'
8532' 2.70' SEALBORE DEPLOY SLV, D=225
MILLOUT WINDOW (04-38A) 8623'-8632'
9103'
W
1 9762' 1
PBTD 9992
2-3/8' LNR 4.7#, 13CR-85 TH511,
.0039 bpf, D = 1.995'
DATE
PERFORATION SLAM f?f
DATE REV BY COMMENTS
REF LOG: B" ON 10/15/17
ORIGINAL COMPLETION
ANGLEAT TOP PERF: 79° @ 8940'
Note:
Refer to Production DB for historical perf data
SIZE
SPF INTERVAL
Opn/Sgz
SHOT
SOZ
1.56"
6 8940-9075
O
10/21/17
11/01/17
1.56"
6 9110-9295
O
10/21/17
1.56"
6 9345-9375
O
10/21/17
1-56"
6 94240-9535
O
10/21/17
1.56"
6 9603-9708
O
10/21/17
9103'
W
1 9762' 1
PBTD 9992
2-3/8' LNR 4.7#, 13CR-85 TH511,
.0039 bpf, D = 1.995'
DATE
REV BY COMMENTS
DATE REV BY COMMENTS
09/06191
ORIGINAL COMPLETION
11/07/17 MGS/JMC SET LTP w/PTSA & R NP
02108/95
D46 RWO (SCAB LNR)
11/07/17 BSEJJMD GLV C/O (11/04/17)
0327195
D46 RWO
11/07/17 JNL/JMD
ADDED REF & BF ELEV
1022M7
N-CDR2 CTD (04-38A)
0523/18 JPK/JMD
GLV C/O (0520/18)
11/01/17
JMD DRLG HO CORRECTIONS
11/18119 DD/JMD ADDED CONDUCTOR NFO
11/01/17
SM/JMD FINAL ODE APPROVAL
PRUDHOE BAY UNIT
WELL 04-38A
PERMIT No: 217-098
API No: '500292221001
SEC 27, T11N, R15E, 383' FSL & 65
BP Exploration (Alaska)
THE STATE
°fALASKA
GOVERNOR MIKE DUNLEAVY
Todd Sidoti
Well Intervention Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 04-38A
Permit to Drill Number: 217-098
Sundry Number: 319-409
Dear Mr. Sidoti:
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
w .aogcc.alaska.gov
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
24si6eL.hmielowski
Commissioner
DATED this I � day of September, 2019.
3BDMS I�" SEP 12 2019
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
?n AAr 99 osn
rsCULIVE®
SEP 0 9 2019
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ OperatiQ�S^tl� ❑
ChangF
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Approv ❑
Plugfor Redrill Other Nitrite Squeeze Trial
❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑
(H2S Inhibition)
2. Operator Name: BP Exploration (Alaska), Inc
4. Current Well Class:
Exploratory ❑ Development 0 .
5. Permit to Drill Number 217498
3, Address: P.O. Box 196612 Anchorage, AK
99519-6612
Stretigraphic ❑ Service ❑
6_ API Number: 50-029-22210-01-00 '
7. If perforating:
What Regulation or Conservation Order governs well spacing in this pool?
8. Well Name and Number.
Will planned perforations require a spacing exception? Yes ❑ No 0
PBU 04.38A
9. Property Designation (Lease Number):
10. Field/Pools.
ADL 028325 •
PRUDHOE BAY. PRUDHOE OIL '
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD(a): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
10069 8722 9992 8741
None 8762
Casing Length Size MD Ti Burst Collapse
Conductor 7820" 34-112 34-112 1490 470
Surface 3460 10-3/4" 34-3494 34-3493 3580 2090
Intermediate 8500 7-5/8" 31-8531 31 - 8488
6890 4790
Scab Liner 3205 5-1/2" x 3-1/2" 5418-8623 5416-8579 7740 / 10160 6280 / 10530
Liner 410 5-1/2" 8213-8 3 1 8176-8579 7740 6280
Liner 1500 2-3/8" 8526-10026 1 8483-8733 11199 11776
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
8940 - 9708
8784 - 8794
4-1/2" 12.6# x 3-1/2" 9.3#
13Cr80
31 -6630
Packers and SSSV Type: 4-1/2" Baker SABL-3 Packer
Packets and SSSV MD (ft) and TVD (ft)' 5354 / 5353
3-1/2" Baker SABL-3 Packer
6575/6572
4-1/2" Camco TRCF SCSSSV
2170 12170
12. Attachments: Proposal Summary El Wellbore Schematic Ej
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑
Exploratory ❑ Stratigrephic ❑ Development EI - Service ❑
14. Estimated Date for Commencing Operations: 9/27/2019
15, Well Status after proposed work:
Oil El. WINJ ❑ WDSPL ❑ Suspended ❑
16. Verbal Approval: Date:
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
Commission Representative:
GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not
Contact Name: Sitloti, Totltl
be deviated from without prior written approval.
Authorized Name: Sitloti, Totltl Contact Email: Todd.Sidoti00bp.cem
Contact Phone: +1 907 564 5113
Authorized Title: Well Intervention E igineer
Authorized Signature: Date:
r
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number.
L/D
Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑
Other:
�3BDMS 6 -/SEP 12 2019
Post Initial Injection MIT Req'd? Yes No ❑/.
Spacing Exception Required? Yes ❑ No Gd Subsequent Form Required: 16 -46 J
APPROVED BYTHE
Approved by: �/ COMMISSIONER COMMISSION Date:
ORIGINAL
Form 10403 Revised D4/2017 Approved application is valid for 12 months from the date of approval.
ubmi[ Form and
Attachments in Duplicate
10-403 Sundry Application for Well PBU 04-38A PTD #217-098
Expected Start Date: September 27, 2019
Current condition of well: Gas Lift Producer, Operable, Online:
Oil Rate:
141 bopd
Gas Rate:
5143 Mscf/Da
Water Rate:
7196 bw d
Flowing Tubing Pressure:
279 psi
Shut-in Wellhead Pressure:
300 psi
Reservoir Pressure:
3304 psi
Program Objective(s):
04-38A has relatively high H2S (300-625 ppm range) as do several others at DS -4.
To better understand how to economically manage this risk over the long term, we
are trialing an H2S inhibitor treatment known as a Sodium Nitrite Squeeze.
Over the past year, several high-H2S wells in GPB were monitored. 04-38A was
selected for the Nitrite Squeeze trial due to its elevated and consistent H2S levels
in addition to its good on-time. Should this inexpensive treatment prove effective at
reducing H2S levels in individual producers, GPB will have a potential option for
safely producing high H2S wells in the event that they continue to increase or if
individual facilities reach emission limits in the future. Continued monitoring of H2S
levels following this treatment is critical to evaluating the effectiveness of the Nitrite
Squeeze, these details are outlined in the Pumping and Monitoring Requirements
tables.
Proposed Program:
1. Perform TIFL
2. Pump Nitrite Squeeze (See Pumping Details Table)
3. Monitor Results (See Monitoring Details Table)
BP Exploration (Alaska), Inc.
P.O. Box 196612 Anchorage, AK 99519-6612
10-403 Sundry Application for Well PBU 04-38A PTD 6217-098
Pumping Details:
Wei
04-38A
Work Desc
Write Squeeze
APE
CAPSU
Date
0710&19
En kleer
MeredYth Richards
Phone
907 564-4867
H2S Value 300
112S Date rl 5/302019
sodium nitrite into reservoir for short-term reduction of HS produced from well.
ie design for 04-38A will use 1000 ppm of sodium nnnte (100 lbs dry salt in sacks per 290 bbl
rck of hot water). A 580 bbl treatment will be planned to make maximum use of one truck.
ie 747 barrel 2% KCI overflush and freeze protect cap was sized to push the treatment 4' to
into the formation assuming 250' to 550' of perforations take fluid. Pumping pressures
ould be limited to avoid exceeding the frac gradient or 5 bpm. Shut in for a standard 12-
iur soak to avoid more than one day of lost production.
Pump Schedule
State
Fluid Type
Pum Into
Vol bbls
Rate
m Max Pres
S ar
Methanol! Water
TBG
5
5
1200
Load
Sodium Ndrde
TBG
580
5
1200
Over -Flush
1% KCI
TBG
707
5
1200
Freeze Protect
Methanol l Water
TBG
40
5
1200
1. Pump nitrite treatment per schedule
2. Do not exceed 1200 psi treating pressure once fluid is caught.
Directions
When filling out the pumping templateplease note the following
MIT x1
TestType
Tar et Pressure
Mex Applied Pressure
Test Fluid
Inter Lints Confsmed ❑
MIT*3
Test Type
Target Pressure
Max Applied Pressure
Test Fluid
Integrity Lends Confirmed ❑
If "MIT" is selected as a stage. the corresponding MIT section must be filed out. The boxes are defined as follows'.
Test Type: Type of test to be performed (MIT -T, MIT -IA, MIT -OA. etc)
Target Pressure: This is the requested Mll test pressure (M MIT -T to 2500 psi)
Max Applied Pressure This m the max pressure that can be applied in order to achieve a passing MIT of the target test pressure, typically 10%
greater than target pressure. BP practice 100218 (1045) requires that the test pressure must remain above or equal to the target pressure during
the snore test evaluation period This pressure must not exceed the lowest rated working pressure (taking into account corrosion, erosion, etc) of
any well banter element in the wren barrier envelope
Test Fluid: The fluid to be used for the test.
Integrity Limits Confimted: By checking this box, you have confirmed that the -Max Applied pressure' requested is within the limits of the wells
Well Barrier Envelope'
BP Exploration (Alaska) , Inc.
P.O. Box 196612 Anchorage, AK 99519-6612
10-403 Sundry Application for Well PBU 04-38A PTD #217-098
Monitoring Details:
Monitoring
This is an important trial, and the data from pre and posttreatment are critical to understanding the value.
Monitoring should include:
Analyte
Location
frequency
By Who
Purpose
Once week before,
Production
Test separator
Daily 7 days after,
Drill Site Operator
Monitor production and
Monthlyafter
enable sampling
Weekly 4 weeks pre.
112S
Wellhead
Twice daily 7 daysafter,
GPB Lab
Definition of success
Weekly 4 weeks afte r,
Monthly yearafter
Residual nitrte,
Once week before,
Understand flowback
nitrate, sulfate, sulfide
Test Separator
Twice daily 7 daysaRer
GPB Lab
characteristics
Elemental sulfur
Once week before,
confirm corrosion
analysis
Test Separator
Twice daily 7 daysafter
GPB Lab
assumptions
Once week before,
PH
Test Separator
GPB Lab
Confirm corrosion
Twice daily 7daysafter
assumptions
Once week before,
Total iron
Test Separator
GPB Lab
Confirm mechanism
Twice daily 7 days afte r
SRB, SRA, total
Once week before,
GPB Lab sent to
prokaryotes
Wellhead
Weekly imonth after
Westport for gPCR
Confirm mechanism
Total organisms
Wellhead
Once week before,
Nalco Champion PC
Confirm mechanism
Weekly 1 month after
using ATP
Corrosion monitoring
Corrosion rate
We If L ine
Month before and after 1by
ER probe in well
Confirm corrosion
line
assumptions
BP Exploration (Alaska), Inc.
P.O. Box 196612 Anchorage, AK 99519-6612
10-403 Sundry Application for Well PBU 04-38A PTD #217-098
Wellbore Schematic:
3. 8.E11 53'
'BEY= 6Y
F1EY = 20.96'
°' _.__71ar 2D•(X7MXXTtxt 7
Argk � 105' � 10003' 1, _
Im MD= WA D=
Im NO 8600 SS
l 10-3/4- CSG. 45.61, F55. 0.9.95T -( _K
Limum tD = 1,781"@ 8534'
NIPPLE IN LTP WIPTSA
4 -VT nW. 12.61,13CR-80 ISCT, ps
0152 1p1, 13= 3,958-
FT
958•IS-tMx}1M 6G6LFR 6
W.1)= 2.992•
0232 bpl. 0.4 697
L -W.. 0 •
04-38A > 0SWr. �WWE�eN'ASC"
21527815276r 0 IA-KMGI so I Bx 1 24 I05M
63N• ]-sro•x4-In•BatsABLapatn•3w•
S10$' 4-t2'%}12•X0.0=2.81•
(RUG WLL BE TGM)
WOi' -(]-516•X618 RI"LWt GkO=486'
I/ 1 XN WMLLr9 TO
tr2• wee, 0= 299'.
_-
5� 1/Y % 0.1fY x0. D � 2 el•
o-va Ne LIF* In JOLUTU i FBA 40 R
w @ 8534', D = 1 781• (102417)
GATE REV BY I
I.00Br bpt, 0= 2.997
_
I7 SE7L71dw1P15A 6 RNP
111rOM6 ala RW0(9cAe Lfii)
11107111UsbiRC Civ tlO(11/0Y17)
WrLll% 078 RYFO
11107!17 JN.IRA ADDU F6
fB30PA710N RY
05/23018 JROJkU GLV C10(052N18)
REF LOG_ BW ON 1x15/17
�1Y01r17 SWR.0 FIALDDEAFFRUVAL
ANOLEAT TOPf6S: 79' @ 8910'
Nab: Rota b fRmAxion DB for wokalperr deb
SQE s F M160VAL
()OrJSge'i SHOT
SO2
_. ��
1.58• 8 8940-9075
1.56• 6 9110-9286
O ;1021117
O 1D21/17
1.56• 6 W45 - 9375
1.68• 8 9040-9536
O 1021117
O 1021/17
2NF NR. 41111JC
1.56' 6 9603 - 9706
0 11021/17
1
10009 bpf, 0 = 1995•
ISI/71Ht
171, 17CR6D, 0232 bpf, D=4.892' 9103•1106•
-F-M---]
GATE REV BY I
rhA7 REV BY CW.B41^
®MMI 01111MAL COMPLCD011111071
I7 SE7L71dw1P15A 6 RNP
111rOM6 ala RW0(9cAe Lfii)
11107111UsbiRC Civ tlO(11/0Y17)
WrLll% 078 RYFO
11107!17 JN.IRA ADDU F6
10'B7i7 MCDIQ CTDIW38A)
05/23018 JROJkU GLV C10(052N18)
11IOtr17 TNU DIiGHDCDf 37r1QN5
�1Y01r17 SWR.0 FIALDDEAFFRUVAL
BP Exploration (Alaska), Inc.
P.O. Box 196612 Anchorage, AK 99519-6612
1Ril. )hM BAY LR41
WBL043UA
PEFUrM 217-096
ARN9: '500292221001
SEC27. T11K RISE 387 FSL 8655' FEL
OPFaplwaeoa (Abeka)
Wallace, Chris D (DOA)
From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEn inee
b .com>
Sent: Saturday, May 5, 2018 7:30 AM
To: AK, GWO Well Integrity Engineer;AK, OPS EOC Specialists;AK, OPS FS2 DS Ops Lead;
AK, OPS FS2 Facility OTL;AK, OPS FS2 Field OTL;AK, OPS FS2 OSM;AK, RES GPB East
Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL;G GPB FS2
Drillsites; Richards, Meredyth; Regg,James B (DOA)
Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects
Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep;AKIMS
App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert,
Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau;
O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,
Aras J;Wallace, Chris D (DOA);AK, GWO Well Integrity Well Information
Subject: UNDER EVALUATION: Producer 04-38 (PTD#2170980) Sustained inner annulus casing
pressure above NOL
All,
Producer 04-38(PTD#2170980)was reported to have sustained inner annulus casing pressure above NOL after it was
shut in due to a power outage at flow station#2 on 4/30/2018. The well failed a subsequent warm TIFL on 5/4/2018
indicating a potential loss of one or more well barriers. At this time the well is reclassified as Under Evaluation and is on
the 28 day clock for diagnostics and repairs.
Plan Forward:
1. Slickline: GLV change out
2. DHD: Warm TIFL
3. Well Integrity Engineer:Additional diagnostics as needed
Please respond with any questions,
Joshua Stephens
r
Well Integrity Engineer
Office: 907-659-8110
Cell: 907-341-9068
WC)
skew1
DATA SUBMITTAL COMPLIANCE REPORT
1/22/2018
Permit to Orill
2170980 Well Name/No. PRUDHOE BAY UNIT 04-38A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-22210-01-00
MD
10069
TVD 8722 Completion Date
10/22/2017 Completion Status 1-0I1-
Current Status 1-0I1- UIC No
REQUIRED INFORMATION
/
_—Mud Log No 1/
,�/
Samples No V
Directional Survey Yes✓
-
DATA
INFORMATION
List of Logs Obtained: MWD / GR / RES
(from Master Well Data/Logs)
Well Log Information:
Log/
Electr
Data
Digital
Dataset
Log Log Run Interval OHI
Type
Med/Frmt Number Name
Scale Media No Start Stop
P CH
Received
Comments
ED
C
28760 Digital Data
8366 10069
11/1/2017
Electronic Data Set, Filename: 04-
38A_LW D_ FINAL_ FIELD_COMPOSITE_15OCT
2017_BHI_CTK.Ias
ED
C
28760 Digital Data
11/1/2017
Electronic File: 11584975.pdf
ED
C
28760 Digital Data
11/1/2017
Electronic File: Post_Run_03_11584975.pdf
ED
C
28760 Digital Data
1111/2017
Electronic File: PreRun_02_USR_11584975.pdf
ED
C
28760 Digital Data
11/1/2017
Electronic File: 04-
38A_GR_Res_150CT2017_MD_FINAL_FIELD_'
BHI_CTK.cgm
ED
C
28760 Digital Data
11/1/2017
Electronic File: 04-
38A_GR_Res_150CT2017_TVDSS_FINAL_FIEL.
D_BHI_CTK.cgm
ED
C
28760 Digital Data
11/1/2017
Electronic File: 04-
Q
38A_GR_Res _15OCT2017_MD_FINAL_FIELD_ ,
BHI_CTK.pdf
ED
C
28760 Digital Data
11/1/2017
Electronic File: 04-
p
38A_GR_Res 15OCT2017_TVDSS_FINAL_FIEL-
1
D_BHI_CTK.pdf
ED
C
28760 Digital Data
11/1/2017
Electronic File: 04-38A Final Survey Report.pdf•
ED
C
28760 Digital Data
11/1/2017
Electronic File: 04-38A Final Survey Report.txt .
ED
C
28760 Digital Data
11/1/2017
Electronic File: 04-38A Final Survey.csv
ED
C
28760 Digital Data
11/1/2017
Electronic File: 04-38A Final Survey.xlsx -
ED
C
28760 Digital Data
11/1/2017
Electronic File: 04-
38A_25_tapescan_131-1I_CTK.txt
ED
C
28760 Digital Data
11/1/2017
Electronic File: 04-38A_5_ tapescan_BHI_CTK.txt
AOGCC
Page 1 of 2
Monday, January 22, 2018
DATA SUBMITTAL COMPLIANCE REPORT
1/22/2018
Permit to Drill
2170980 Well Name/No. PRUDHOE BAY UNIT 04-38A
Operator BP EXPLORATION (ALASKA) INC. API No. 50-029.22210-01-00
MD 10069
TVD 8722 Completion Date 10/22/2017
Completion Status 1-0I1 Current Status 1 -OIL UIC No
ED C
28760 Digital Data
11/1/2017
Electronic File: 04-38A_output.tap
ED C
28760 Digital Data
11/1/2017
Electronic File: 04-
38A GR Res _150CT2017_MD_FINAL_FIELD—
BHI_CTKtif
ED C
28760 Digital Data
11/1/2017
Electronic File: 04-
38A GR Res_ 15OCT2017_TVDSS_FINAL_FIEL'
D_BH I_CTK.tif
Log C
28760 Log Header Scans
0 0
2170980 PRUDHOE BAY UNIT 04-38A LOG
HEADERS
Well Cores/Samples Information:
Sample
Interval
Set
Name
Start Stop
Sent Received Number
Comments
INFORMATION RECEIVED
Completion Report
Production Test Information / NA
Geologic Markers/Tops 9
COMPLIANCE HISTORY
Completion Date: 10/22/2017
Release Date: 7/7/2017
Description
Comments:
Directional / Inclination Data 0 Mud Logs, Image Files, Digital Data Y16 Core Chips Y /
Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files YY Core Photographs Y /
Daily Operations Summary Cuttings Samples Y N Laboratory Analyses Y /
Compliance Reviewed BL' V
A0GC(
c
Date Comments
Date: I / t_/
Pagc 2 01 2 Monday. January 22, 2018
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WEL( DMPLETION OR RECOMPLETION REPI1 AND LOG
0 at11-vLI v GV
NOV 14 2017
la. Well Status: Oil El • Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
1b.WellCCC
20AAC 25.105 20AAC25.110Development
GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One •
Exploratory
®Exploratory ❑
ISeNice
❑ St Test ❑
2. Operator Name:
6. Date Comp., Susp., or Abend.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
10/222017 . 1
217-098 '
3. Address:
7. Date Spudded
15. API Number:
P.O. Box 196612 Anchorage, AK 99519-0612
10/11/2017 -
50-029-22210-01-00
4a. Location of Well (Govemmental Section):
8. Date TO Reached:
16. Well Name and Number:
10/14/2017
PBU 04-38A
Surface: 383' FSL, 655' FEL, Sec 27, Tl IN, RISE, UM
9 Ref Elevations KB 53.00
17. Field/Pool(s):
Top of Productive Interval: 94' FNL, 246' FEL, Sec. 34, Tl IN, RISE, UM
GL 18.88 • BE 20.98
PRUDHOE BAY, PRUDHOE OIL '
10. Plug Back Depth(MWI VD):
18. Property Designation:
Total Depth: 837 FNL, 836 FEL, Sec. 34, TIIN, RISE, UM
• 9992'18741' •
ADL 028325 .
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11. Total Depth (MD/TVD):
19. DNR Approval Number:
Surface: x- 712164 • y- 5952237. Zone - ASP 4
.10069'/87221 •
70-039
TPI: x- 712585 y- 5951771 Zone - ASP 4
12. SSSV Depth (MD/TVD):
20 Thickness of Permafrost MDr VD
Total Depth: x- 712020 y- 5951017 Zone - ASP 4
2170'12170'
1900' (Approx.)
5. Directional or Inclination Survey: Yes m (attached) No ❑
13. Water Depth, if Offshore:
21. Re ddll/Lateral Top Wndow
Submit electronic and printed information per 20 AAC 25.050
N/A (1t MSL)
MD7ND:
8623'18579' .
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and panted logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record,
Acronyms may be used. Attach a separate page if necessary
MWD/GR/RES
23, CASING, LINER AND CEMENTING RECORD
CASING
WT. PERGRADE
FT.
SETTING DEPTH MD
SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
AMOUNT
PULLED
TOP
BOTTOM
TOP
BOTTOM
20"
91.5#
H-va
35'
113'
35'
113'
30"
11 yens AS
10-3/4"
45.5#
J-55
34'
3495'
34'
3494'
13-1/2"
2910 cu ft AS 111,406m ft Class'G', 290 cu ft Class'G'
7-5/8"
29.7#
L -Bo
32'
8532'
32'
8489'
9-7/8"
542 cu It MTC, 348 cu it Class'G'
5-1/2"x3-1/2"
17#/9.2#
N7-80515418'
13cm
8623'
5417'
8579'
Scab Liner
385 cu ft Class'G'
5-1/2"
17#
13C-
1 8213'
8623'
8175'
8579'
6-3/4"
189 cu It Class'G'
2-3/8"
4.7#
18Cr85 1
6526'
10026'
8483'
8733'
3-1/4"
70 sx Class'G'
24. Open to production or injection? Yes ® No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/fVD of Top and Bottom; Perforation
Size and Number):
GRADE DEPTH SET (MD) PACKER SET (MD/TV
4-12" 12.6# 13Cr80 6630' 5354'/5353-
1.56" Gun Diameter, 6 spf
COMPLETION
x 3-1/2"9.3# 13Cr80 6575'/ 6572'
26, ACID, FRACTURE, CEMENT SQUEEZE, ETC.
8940'-9075' 8784'-8794' DATE
9110'- 9295' 8795'- 8798'
/2Z 2
Was hydraulic fracturing used during completion? Yes ❑ No 0 .
Per 20 AAC 25.283 (i)(2) attach electronic and printed
_ _�b
9345'- 9375' 8798'- 8797' {
9440'- 9535' 8795'- 8794' VERIFIED
9603'- 9708' 8797'-8794' L
information
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
9762' Fish: BOT Circulation Sub Motor Parabolic Mill
2555' Freeze Protect w/ 50 Bbis Diesel
27. PRODUCTION TEST
Date First Pmduclion: November 6, 2017
Method of Operation (Flowing, gas lift, etc.): Gas Lift
Date of Test: 11/8/17
Hours Tested
Production for
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Choke Sive:
Gas -Oil Ratio:
10
Test Period
1037
625
784
85
186D
Flow Tubing 600
Press
Casino Press:
1480
Calculated
24 Hour Rate �1
Oil -Bbl:
2488
Gas -MCF:
1500
Water -Bbl:
1881
Oil Grevily-API from:
WA
Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only
VtL 11/1s//9'
x (r1sl, RMTS L" NOV 1 2017, �ir-tT r7 a
28. CORE DATA Conventional Cores) Yes ❑ No IZ Sidewall Cores Yes ❑ No m
i
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Permafrost - Top
Well Tested? Yes ❑ No 0
Permafrost- Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
8841
8744'
separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
CGL - Zone 3
8633'
8588'
Base of CGL - Zone 2C
8673'
8626'
23 SB - Zone 2B
8735'
8678'
21TS - Zone 2A
8841'
8744'
Zone 2B (Invert)
9882'
8767'
Formation at total depth:
Zone 2B (From Base)
9882'
8767'
31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post -Rig Work, Survey, Cement Report, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070,
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Browning, Zachary H
Authorized Title: Inf a n and Dat ntroller Contact Email: Zachary.Browning@bp oom
Authorized Signature: Date: 1 I {{. Contact Phone: +1 907 564 5220
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (fop of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean we level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex. 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29,
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and panted logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this forth: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Forth 10-407 Revised 512017 Submit ORIGINAL Only
WB-LhEAD
FMC
AC IIATOR
REF LOG: BH ON 10/15/17
OKE. ELEV =
53'
RTF ELBE =
53'
BF. ELEV =
2D.W
KOP=
7100'
Max Angle = 105° @ 10043'
Datum MD=
NA
DatumTVD:
Saw SS
20" 00NCl1Cf0t�
Minimum ID = 1.781" @ 8534'
R NIPPLE IN LTP w/PTSA
4-12' TBG, 12.6#, 13CR-80 NSCT, 5405'
.0152 bpf, K)=3.958"
TOPOF 5-12' X 11/2- SGB LNR —1 64W
11/2' TBG, 9.3#, 13CR40 FOX, 6622
.0087 bpf, D = 2.992'
SGB LNR, 17#, NTSOS NSCC 8195
bpf, D = 4.892'
TOPTOP OF
112' LNRSCAB, 9.2#,13CR-80 NSCT, H 8715'
.0087 bpf, D = 2-992'
04-38A SAFETY NOTES: WELL ANGLE> 70" @ 8910. MAX
C 12.9'0 8940'.—CFMQOMETBG, LNR & SCAB
2162' 4-1/2' CAM TRCF SSSV NP, D=3.817
LOCKED OUT (08/25/08)
GAS LFT A4ANDRAS
PE3 FORATION SLI MARY
09106191 ORIGINAL COMPLETION
REF LOG: BH ON 10/15/17
02/08195 616 I&VO (SCAB L"
ANGLEATTOPPERF: 790 @ 8940
Note:
Refer to Production DB for historical perf data
SIZE
SPF
INTERVAL
gxgSqz
SHOT
SOZ
1.56'
6
8940-9075
O
1021/17
1.56'
6
9110-9295
O
1021/17
DSO
1.56"
6
9345-9375
O
10121/17
1.56'
6
9440-9535
O
10121/17
1.56'
6
9603-9708
O
10121/17
04-38A SAFETY NOTES: WELL ANGLE> 70" @ 8910. MAX
C 12.9'0 8940'.—CFMQOMETBG, LNR & SCAB
2162' 4-1/2' CAM TRCF SSSV NP, D=3.817
LOCKED OUT (08/25/08)
GAS LFT A4ANDRAS
0,
D = 3.94'
4-12
(PLGW1DT=)B2.81'
7-518' X 5-12' SLF+6 LNR HGP. D = 4.86'
656T—j5.12'X3-12'BKRS-3PeRV=2.82'
6600'3-12" i -ES XN NPMLLEDTO 2.80' (08/30/17)
3-12'WLEG, D=2.99'
= 2.87'
8526' 11/2' KB LTPw/N. SOLUTIONS PISA
NPO 8534', D= 1.781' (1028/77)
8632' 2.70' SFALBORE DEPLOY SLV, D=2.2!
MLLOUT WINDOW (04-38A) 8623' - 8632'
PBro
LNR, 4.7#, 13CI
bpf, D = 1.995'
DATE REV BY I COM E]NTS
DATE ROV BY COMIARM
09106191 ORIGINAL COMPLETION
11107117 MG&AC SET UP w /PISA & R NP
02/08195 616 I&VO (SCAB L"
S2
03127195 616 AM
11/07/17 JNdIMD ADDED Tiff & BF B -EV
11822/17 H-COR2 CTO (04-38A)
11/01/17 JAD DRLG HD OORRMTIDN9
11/01117 SMNJM,D FNALODEAPPROVAL
52 B
5276
A-KBMG
DSO
I BKS
0
11/04/7
0,
D = 3.94'
4-12
(PLGW1DT=)B2.81'
7-518' X 5-12' SLF+6 LNR HGP. D = 4.86'
656T—j5.12'X3-12'BKRS-3PeRV=2.82'
6600'3-12" i -ES XN NPMLLEDTO 2.80' (08/30/17)
3-12'WLEG, D=2.99'
= 2.87'
8526' 11/2' KB LTPw/N. SOLUTIONS PISA
NPO 8534', D= 1.781' (1028/77)
8632' 2.70' SFALBORE DEPLOY SLV, D=2.2!
MLLOUT WINDOW (04-38A) 8623' - 8632'
PBro
LNR, 4.7#, 13CI
bpf, D = 1.995'
DATE REV BY I COM E]NTS
DATE ROV BY COMIARM
09106191 ORIGINAL COMPLETION
11107117 MG&AC SET UP w /PISA & R NP
02/08195 616 I&VO (SCAB L"
11107117 &9E?JM1D GLV C10 (11/04/17)
03127195 616 AM
11/07/17 JNdIMD ADDED Tiff & BF B -EV
11822/17 H-COR2 CTO (04-38A)
11/01/17 JAD DRLG HD OORRMTIDN9
11/01117 SMNJM,D FNALODEAPPROVAL
9762' 1
I. H 10026'
PRUDHOE BAY LUT
WELL: 04-38A
PERMIT No: 217-098
AM No: '500292221001
SEC 27, T1IR RI 5F 383' FSL & 655' FEL
BP Btploration (AMsska)
Common Well Name: 04-38
Event Type: RE -ENTER -ONSHORE (RON)
Project: Prudhoe Bay
Rig Name/No.: CDR -2
Rig Contractor: NABORSALASKA DRILLING IN
Active datum: KB @53.00us6 (above Mean Sea
Date From - To Hire
(hr)
10/6/2017 03:00 - 06:30 3.50
North America - ALASKA - BP
Page 1 of 9
Operation Summary Report
AFE No
Start Date: 10/8/2017 End Date: 10/15/2017 X3-018JR-C: (2,406,171.00)
Site: PB DS 04
Task
RIGU
06:30 - 11:30 5.00 RIGU
11:30 - 13: 1_
00 1.50 RIGU
Code
NPT Total Depth Phase
RIGU
(usft)
P
PRE
P
PRE
RIGU
- -
IN
PRE
BPUOI: USA00001143
Descnption of Operations
REVIEW PROCEDURE AND CONDUCT PJSM
WITH TRUCKING CREW AND NABORS CREW
FOR MOVING RIG.
- REVIEW USE OF 12X12 STOP BLOCK, STOP
COMMAND AND GOOD RADIO
COMMUNICATIONS.
- PULL MUD MODULE AWAY AND STAGE AT
ENTRANCE TO PAD.
-PULL SUB AWAY FROM WELL.WSL
WITNESSED, PAD OPERATOR WAIVED.
- INSTALL JEEPS UNDER BOTH MODULES
FOR ROAD TRAVEL.
;- PRE MOVE MEETING WITH SECURITY.
- TOTAL MOVE DISTANCE APPROXIMATELY 24
'MILES.
I MOVE RIG OFF OF PAD AND DOWN F PAD
ACCESS ROAD.
,-MOVE RIG DOWN K PAD ROAD. STAGE UP
IAT WEST DOCK JUNCTION.
- ROAD CONDITIONS DICTATE SCARFING
NEEDED TO MOVEAH_EAD SAFELY.
WAIT ON LOADER TO COME OUT AND SCARF
AHEAD OF THE RIG.
- WEATHER CONDITIONS ARE SNOW WITH
FRESH WET SNOW ON THE ROAD AND SOME
ICE.
13:00 - 17:30 4.50 RIGU P PRE CONTINUE TO MOVE RIG TO DRILL SITE 04
ARRIVE LOCATION _
17:30 - 21:00 3.50 RIGU } P PRE WSL VERIFIED CASING PRESSURES PER
SOP
REVIEW PROCEDURE AND CONDUCT PJSM
WITH TRUCKING CREWAND NABORS CREW
21:00
- 00:00 3.00
RIGU
10/9/2017 00:00
- 01:30 1.50
RIGU
01:30
- 02:30 1.00
RIGU
02:30
- 03:30 1.00
RIGU
03:30 - 06:30 3.00 WHSUR
Printed 11/6/2017 1:31:13PM *All depths reported in Drillers Depths'
FOR MOVING RIG.
- REVIEW USE OF 12X12 STOP BLOCK, STOP
COMMAND AND GOOD RADIO
COMMUNICATIONS.
- SPOT SUB OVER WELL WITH WSL AND TP
WITNESSING
- SPOT MUD MODULE. SET DOWN
""RIG ACCEPTED 21:00—
P
PRE
PJSM, DISCUSS FOLLOWING PROCESS OF
RIG UP CHECKLIST.
METHODICALLY START RIGGING RIG UP.
PERFORM PRE -SPUD WITH COYNE / WARD
CREWS
P
PRE
CONTINUE WITH RU CHECKLISTS.
N
PRE
HOOK UP TO PERFORM LTT. MASTER
FAILING LTT. VERIFY LIQUID PACK ON TREE
ATTEMPT LTT TEST AGAIN. FAIL. VERIFY
SWAB HOLDING,
P
PRE
GREASE CREWARRIVED. SERVICED TREE.
PERFORMED LTTAGAINST MASTER/SWAB.
PASSED.
P
PRE
NIPPLE DOWN TREE CAP / NU MPD LINE
PREP LUBRICATOR FOR TESTING
Printed 11/6/2017 1:31:13PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 2 of 9
Common Well Name: 04-38
—
— ---
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Data 10/8/2017 End Date: 10/15/2017
X3-018JR-C: (2,406,171.00)
Project: Prudhoe Bay
Site: PB DS 04
Rig Name/No.: CDR -2
Spud Daterrime: 8/21/1991 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001143
Active datum: KB @53.00usR (above Mean Sea Level)
Date From - To Hrs
Task Cade NPT Total Depth
Phase
Description of Operations
_ (hr)
_ (ustt)
06:30 - 09:30 3.00
BOPSUR P
PRE
NIU 7 1/16"X 5M BOPE.
- STACK CONFIGURATION AS FOLLOWS: TOP
TO BOTTOM: 7 1/16" X 5M.
-ANNULAR PREVENTOR, BLIND SHEARS, 2"
PIPE SLIPS, MUD CROSS
- 2 3/8" PIPE / SLIPS, 2 3/8" PIPE / SLIPS, MUD
CROSS, BLIND SHEARS, 2" PIPE SLIPS.
09:30 - 12:00 2.50
RIGU P
PRE
MAKE UP NOZZLE, STAB ON WELL.
- FLUID PACKAND PREPARE TO DISPLACE
COIL.
- DISPLACE COIL W/ 6.6 PPG 3% LUBE
QUIKDRIL.
12:00 - 14:00 2.00
BOPSUR P
PRE
PREPARE TO TEST BOPE.
-RIG UP EQUIPMENT, FLUID PACKAND LINE
UP.
- OPEN SWAB VALVE, PRESSURE UP TO 3500
PSI, (SHELLTEST).
_
_- NOTIFYAOGCC OF IMPENDING TEST. _
14:00 - 14:30
0.50
BOPSUR P
PRE
H2S/EVACUATION DRILL. (UNANNOUNCED)
- HIGH ALARM SOUNDED, DRILL SITE
OPERATOR NOTIFIED.
-ALLHANDS MUSTEREDTO MUSTERAREA
IN TIMELY MANNER.
,- LESS THAN (5) MINUTES TO MUSTER.
-AAR. DISCUSSED GAPS. TRUCK DRIVER DID
NOT HEAR ALARM.
- TRUCK DRIVER WAS PICKED UP BY CREW
DURING EVACUATION.
- SITE CONTROL WILL MAKE
ANNOUNCEMENTAND NOTIFY 3RD PARTIES.
- (2) HANDS OPERATING MANLIFT DID HEAR
ALARM AND RESPONDED CORRECTLY.
- WIND DIRECTION NOTED. PAD SECURED.
—
GOOD DISCUSSION.
14:30 - 20:30 6.00
BOPSUR P
PRE
FUNCTION TEST GAS ALARMS.
- COMMENCE BOPE TEST AS PER AOGCC
AND BP REQUIREMENTS.
- TEST BOPE TO 250 PSI LOW, 3500 PSI HIGH
FOR 5 MINUTES EACH
- ALL TESTS CHARTED, SEE ATTACHED BOP
TEST CHARTS
- TEST WITNESSED BYAOGCC REP LOU
LAUBENSTEIN
- PERFORMED ACCUMULATOR DRAWDOWN.
2030 - 2200 1.50 1 BOPSUR P PRE -SWAP OUT LUBRICATOR. MEASURE
22:00 - 00:00 2.00
10/10/2017 00:00 - 01:00 1.00
ANNULAR TO RISER DISTANCE FOR RKB'S
- PJSM, DISCUSS SIMOPS WHILE VALVE
CREW CHECKS TORQUE ON TREE BOLTS.
BOPSUR P PRE IRV/PACKOFF TEST/ LUBRICATOR
- REVERSE CIRCULATE TO FLUID PACK
STACK.
- TEST TO 250 PSI LOW, 3500 PSI HIGH FOR 5
MINUTES EACH
- TEST C9/C10 BACKWARDS. BHI INSTALL
FLOATS IN UQC WHILE TESTING
- TEST TO 250 PSI LOW, 3500 PSI HIGH FOR 5
MINUTES EACH
- PERFORM VISUAL BODY TEST ON UQC
RIGU P PRE PRESSURE TEST FLOATS IN UQC 703500#.
GOOD TEST.
Printed 1116/2017 1:31 13PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name. 04-38
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/8/2017
Project: Prudhoe Bay Site: PB DS 04
Rig Name/No.: CDR -2 Spud Date/Time: 8/21/1991
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @53.00usft (above Mean Sea Level)
Date From - To Firs Task Code NPT
(hr)
01:00 - 04:30 3.50 RIGU P
End Date: 10/15/2017
Total Depth Phase
(usft)
PRE
04:30
- 05:45
1.25
RIGU P
PRE
05:45
- 09:15
3.50
RIGU P
PRE
09.15 - 11.15 2.00 RIGU P PRE
V 15 - 12'.45 1 50 STWHIP P WEXIT
Printed 11/6/2017 1:31 13PM 'All depths reported in Drillers Depths*
Page 3 of 9
AFE No
K3-018JR-C: (2,406,171.00)
BPUOI: USA00001143
Description of Operations
PJSM, PU BPV LUBRICATOR. EVACUATE
MUD OUT OF STACK. MEASURE FOR
EXTENSIONS
TILT MAST TO CENTER UP. STAB BPV
LUBRICATOR
FILL STACK WITH METHANOL. PRESSURE
TEST TO 3500#
GOOD TEST. PRESSURE UP ON MASTER TO
1000#. OPENUP. PRESSURE FELL TOO#
RIH AND LATCH VALVE. POOH. 0+
PRESSURE.
LTT MASTER / SWAB VALVE TO 3500#. NO
VISUAL FLOW
FLUSH THROUGH LUBRICATOR TO TIGER
TANK.
BREAK LUBRICATOR OFF. ISA BPV
RETREIVED.
RIG UP FOR BULLHEAD WELL KILL.
- MAKE UP TO WELL, TEST OTS / 3500 PSI,
OK.
- LINE UP TO BLEED ANNULI. _
PRE JOB SAFETY MEETING WITH ALL HANDS.
- REVIEW PRESSURE CROSS CHECK LIST
AND IDENTIFY MAXIMUM PRESSURES ON I/A
AND CIA.
- SET ALARMS AND TRIPS. VERIFY VALVE
ALIGNMENT.
- OPEN MASTER VALVE, SWAB IS CLOSED,
LINE UPON MANAGED PRESSURE LINE.
- PUMP (5) BBLS METHANOL AHEAD, FOLLOW
WITH 275 BBLS 1% HEATED SLICK KCL.
- INITIAL RATE = 5 BPM @ 2950 PSI. OBSERVE
PRESSURE STEADILY DROPPING.
- FOLLOW WITH (30) BBLS HI VIS PILLAND
120 BBLS 8.6 PPG DRILLING MUD.
- FINAL CIRC PRESSURE, 5 BPM @ 2050 PSI.
SHUT DOWN AND LET BLEED INTO
FORMATION.
- BLED DOWN TO 35 PSI AFTER 25 MIN. OPEN
UP AND PUMP ACROSS THE TOP.
- PUMP @ 1.77 BPM FOR 25 MINUTES, NO
FLUID LOSTAND NONE GAINED.
-OPEN UPAND PERFORM 10 MINUTE FLOW
CHECK. WELL BORE STABLE, 8.6 PPG MUD IN
AND OUT.
PJSM. BREAK OFF INJECTOR. CLOSE
MASTER VALVE
- LAY DOWN LUBRICATOR, PICK UP BOP
TEST LUBRICATOR SECTIONS.
- PICK UP GREASED TEST JT, CLOSE RAMS
FOR IMPRINT.
- LAY DOWN TEST JT, LAY DOWN TEST
LUBRICATOR SECTIONS.
- PICK UP LUBRICATOR AND TEST BREAK
PJSM. PICK UP WINDOW MILLING ASSEMBLY.
- 2 3/8" EXTREME MOTOR, AKO SET @ .6
DEGREES
- MAKE UP TO COIL, MAKE UP INJECTOR TO
WELL.
- TEST OTS @ 3500 PSI, OK. NO LOSSES TO
WELL, WELL BORE STABLE.
North America - ALASKA - BP
Operation Summary Report
Name: 04-38
Event Type: RE-ENTER- ONSHORE(RON) Start Date: 1018/2017
Project: Prudhoe Bay Site: PB -m-64
Rig Name/No.: CDR -2 Spud DateRme: 8/21/1991
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @53.00usft (above Mean Sea Level)
End Date: 10/15/2017
Page 4 of 9
AFE No
X3-018JR-C'. (2,406,171.00 )
Rig Release:
BPU0I: USA00001143
Date From - To Hrs
Task Code NPT Total Depth
Phase Description or Operations
(hr)
(usft)___
-.-_
12:45 - 1500 2.25
STWHIP P
---_—
WEXIT RIH W/ WINDOW MILLING BHA.
_
- EDC OPEN, PUMPING MINIMUM RATE.
15:00 - 15:15 0.25
STWHIP P 8,554.00
WEXIT LOG TIE IN W./ GAMMA, F/8460'-8554'@10
FPM.
_
- MINUS 27' CORRECTION.
15:15 - 15:30 0.25
STWHIP P 8,623.00
WEXIT CONTINUE IN HOLE.
- LIGHT TAG @ 8623'.
- ESTABLISH PARAMETERS.
15:30 - 00:00 8.50
STWHIP P 8,627.50
WEXIT PUMPING 1.63 BPM IN / 1.63 BPM OUT @ 3370
PSI.
- 38K UP WT, 26K D0WN Wt.
-COMMENCE WINDOW MILLING OPERATION
I @ 8622.7'
- AFTER 1 FT ENGAGE AUTODRILL.
MILL 2.80" WINDOW IN 3-1/2x5-1/2"
CASING/LINER PER BAKER REP FROM
8,622.7' MD TO 8,627.5' MD
- RATE: 1.70 BPM IN, 1.71 BPM OUT
- MUD WEIGHT: 8.59 PPG IN, 8.61 PPG OUT
-DW0B: 3-3.5 KLBS
__
- CIRC PRESSURE: 3,500 PSI
10/112017 00:00 - 04:15 4.25
STWHIP
P
8,628.00 !
WEXIT MILL 2.80"WINDOW IN 3-1/2x5-1/2"
CASING/LINER PER BAKER REP FROM
8,627.5'MDTO8,628'MD
- RATE: 1.70 BPM IN, 1.71 BPM OUT
- MUD WEIGHT: 8.59 PPG IN, 8.61 PPG OUT
-DW0B: 3-3.6 KLBS HS TF
- CIRC PRESSURE: 3,500 PSI SLOWING ROP
AS WOB / MTR WORK DICTATE.
- LOSS RATE NOT MORE THAN 1/2 BPH.
04:15 - 0600 1.75
STWHIP P 8,62820
WEXIT CONTINUE MILLING WINDOWAS
PRESCRIBED BY WELL PROGRAM AND
BAKER HAND.
- 1.66 BPM IN 11.66 BPM OUT @ 3475 PSI.
WOB 3.SK
!
-PUMPA S BBL L0 VIS/ S BBL HI VIS SWEEP
_
AROUND @ 06:00._
06:00 - 16:00 10.00
STWHIP P 6,628.20
WEXIT CONTINUE MILLING WINDOW, (ROP VERY
SLOW)
- SWEEP BACK, BEADS, CEMENT AND METAL.
- 1.66 BPM IN 11 66 BPM OUT @ 3400 - 3450
PSI.
- MAINTAINING HIGH SIDE TOOL FACE.
- Q 09:00 STARTING TO SEE ROP PICKING
UP.
- @ 11:00 PUMP ANOTHER LO / HI VIS SWEEP,
15 BBLS EACH).
-SWEEP BACK... S%SAND ... MAY BE
i
NOSING OUT.
^
WOB SLOWLY DROPPING OFF.
16:00 - 17:30
1.50
STWHIP P 8,642.00
WEXIT PUMP 5 BBLS LO / HI VIS SWEEPSAROUND.
DRILL TO END OF RATHOLE AT 8,6421.
CONDUCT FIRST UP PASS AT 1 FT/MIN, OL
ORIENTATION. SLIGHT MOTOR WORK WEEN
AT 8,628'.
DOWN PASS AT OL, 1 FT/MIN NOTHING SEEN.
UP PASS AT 15L, 1 FT/MIN, NOTHING SEEN,
DOWN PASSAT OL, 1 FT/MIN NOTHING SEEN.
UP PASS AT 15R, 1 FT/MIN, NOTHING SEEN.
SAMPLE FROM END OF RATHOLE HAS 60%
FORMATION.
Printed 11/62017 1:31:13PM *All depths reported in Drillers Depths`
North America - ALASKA - BP
Operation Summary Report
Page 5 of 9 1
Common Well Name. 04-38
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/8/2017 End Date: 10/15/2017
X3-018JR-C: (2,406,171.00 )
Project: Prudhoe Bay
Site: PB DS 04
Rig Name/No.: CDR -2
Spud Date/Time: 8/21/1991 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001143
Active datum: KB @53.00usft (above Mean Sea Level)
Date From - To
Firs Task Code NPT Total Depth Phase
Description of Operations
(hr) (usft)
1730 - 1930
2.00 STWHIP P 8,64200 WEXIT
DRY DRIFTAT OL ORIENTATION, 15 FT/MINIS
CLEAN. TAG AT END OF RATHOLE.
FLAG PIPE AND OPEN EDC. CONDUCT
10 -MIN DYNAMIC FLOW CHECK, STATIC.
MONITOR WELL FOR 10 MINUTES: STATIC
- MUD WEIGHT: 8.59 PPG IN, 8.61 PPG OUT
- RATE: 2.10 BPM IN, 1.72 BPM OUT
OPEN EDC, POH
- RATE: 2.10 BPM. CIRC PRESSURE: 3,300 PSI
19:30 - 20.30
1.00 STWHIP P 8,642.00 WEXIT
MONITOR WELLFOR 10 MINAT BHA -STATIC.
OPEN CT RISER AND VISUALLY INSPECT
'LAST 50' OF CTABOVE CONNECTOR, NO
. FLAT SPOTS SEEN.
INJECTOR OFF THE WELLAT 20:05.
MILLAND REAMER ARE 2.79" NO-GO.
- LAY DOWN MILLING BHA.
2030 - 2145
r
1.25 DRILL P 8,842.00 PRODt
MAKEUP 3.25" DRILLING BHA #2
- PICKUP 2-3/8" ULS MOTOR (2.2 DEG AKO)
AND X"COILTRAK TOOLS
- MAKE UP 2.80" X 3.25" HCC BICENTER BIT
WITH P104 CUTTERS
- SURFACE TESTED COILTRACK TOOL. GOOD
TEST.
- PRESSURE TEST QTS TO 3,500 PSI HIGH
FOR 5 MINUTES
_
-INJECTOR ON: 21:35
21:45 - 00:00
2.25 DRILL P 8,642.00 PROD1
RIH WITH 3.25" DRILLING BHA#2
- RATE: 0.49 BPM IN, 0.86 BPM OUT. CIRC
PRESSURE: 1,210 PSI
- MUD WEIGHT: 8.57 PPG IN, 8.61 PPG OUT
- LOG DOWN FOR TIE-IN FROM 8,490'
_
(FORMATION) WITH -14' CORRECTION
10/12/2017 00:00 - 0315 '.
3.25 DRILL P 8,738.00 PROD1
DRILL 3.25" BUILD FROM 8,642' MD TO 8,738'
MD
- FREE SPIN: 3,600 PSI, 1.68 BPM
- RATE: 1.67 BPM IN, 1.62 BPM OUT. CIRC
PRESSURE: 3,900 PSI
- MUD WEIGHT: 8.59 PPG IN, 8.62 PPG OUT,
ECD: 10.67 PPG (10.5 PPG AT WINDOW)
- ROP: 20 - 40 FT/HR, WOB: 1 - 3 KLBS
0315 - 0515
2.00 DRILL P 8,738.00 PROD1
DRILL 3.25' BUILD FROM 8,738' MD TO 8,780'
MD
- FREE SPIN: 3,650 PSI, 1.67 BPM
- RATE: 1.67 BPM IN, 1.60 BPM OUT. CIRC
PRESSURE: 3,910 PSI
- MUD WEIGHT: 8.60 PPG IN, 8.64 PPG OUT,
ECD: 10.64 PPG (10.5 PPG AT WINDOW)
- ROP: 10 - 40 FT/HR, WOB: 1 - 3 KLBS
-AT 8,740' PUMP 5 BBLS LO / HI VIS SWEEPS
AROUND.
105:15 - 12:15
7.00 DRILL P 6,738,00 PROW
DRILL 3.25" BUILD FROM 8,780' MD 70 8,907'
MD
I
- FREE SPIN: 3,800 PSI, 1.70 BPM
- RATE: 1.70 BPM IN, 1.68 BPM OUT. CIRC
PRESSURE: 3,910 PSI
- MUD WEIGHT: 8.60 PPG IN, 8.64 PPG OUT,
ECD: 10.64 PPG (10.5 PPG AT WINDOW)
- ROP: 10 - 40 FT/HR, WOB: 1 - 3 KLBS
Primed 11/6/2017 1:31:13PM 'All depths reported in Drillers Depths`
North America -ALASKA - BP
Operation Summary Report
Common Well Name: 0438 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/8/2017 End Date: 10/15/2017 X3-018JR-C:
Project: Prudhoe Bay Site: PB DS 04
Rig Name/No.: CDR -2 Spud DateTme: 8/21/1991 12:00:OOAM Rig Release:
(2,406,171 00 )
Page 6 of 9
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001143
Active datum: KB @53.00usft (above Mean Sea Level)
Date From - To Him Task
Code NPT Total Depth
Phase Description of Operations
_— (hr)_
_(usft)—__--
12:15 - 16:00 3.75 DRILL
P 8,965.00
PROD1 DRILL 3.25' BUILD FROM 8,907'MD 7O 8,965'
MD
- FREE SPIN: 3,800 PSI, 1.70 BPM
- RATE: 1.70 BPM IN, 1.66 BPM OUT. CIRC
PRESSURE: 3,910 PSI
- MUD WEIGHT: 8.60 PPG IN, 8.64 PPG OUT,
ECD: 10.64 PPG (10.5 PPG AT WINDOW)
-ROP: 10-30 FT/HR, WOB:1-3 KLBS
PRESSURE CHOKE PLUGGING
CFF,
OFF, GO TO MANUAL CHOKE.
II -UNPLUG MANAGED PRESSURE CHOKE
I WHILE SHORT TRIPPING.
-PUMPS BBLS LO/ HI VIS SWEEPS AROUND
WHILE PULLING TO WINDOW.
- PULL THROUGH WINDOW AND
,TROUBLESHOOT/CLEAR CHOKEAND OUT
MM.
16:00 - 17:30
1.50 DRILL
P 8,965.00
PROD1PERFORM LONG WIPER TRIP TO WINDOW
FROM 8,965' MD
- _
1 __ _
_ _
_ _-_PULL THROUGH_ WINDOW AND OPEN EDC
17:30 - 18:00
0.50 DRILL
P 8,965.00
PROD1 FINISH PUMPING BOTTOMS UP, RETURNS
HAVE CLEANED UP.
CHOKE PRESSURE IS STILL FLUCTUATING,
TROUBLESHOOT.
CONDUCT TIE-IN AT WINDOW RA, NO
.
CORRECTION.
SHUT DOWN PUMP, TRAP 10.5 PPG AT
WINDOW.
RE -BOOT EXPRO CHOKE COMPUTER WHILE
PUMP IS DOWN.
1800 - 19:00 1.00 DRILL
P 8,965.00
PROD? CONDUCT PJSM FOR PURGING OUT MM
WITH COMPRESSOR.
LINE UP TO PURGE OUT MICROMOTION WITH
COMPRESSOR.
BREAK OFF WHIP SENSORS THAT RUN THE
EXPRO AND INSPECT, THEY ARE CLEAN.
19:00 - 00:00 5.00 DRILL
P 8,965.00
PRODi TRAP PRESSURE AND CLOSE EDC.
RIH, PUMP 0.5 BPM KEEP AS DRILLED TF
RUNNING DOWN THROUGH SHALES.
DRILL 3.25' BUILD FROM 8,985' MD TO 9,150'
MD
- FREE SPIN: 3,800 PSI, 1.71 BPM
- RATE: 1.71 BPM IN, 1.70 BPM OUT. CIRC
PRESSURE: 4,000 PSI
- MUD WEIGHT: 8.63 PPG IN, 8.66 PPG OUT,
ECD: 10.70 PPG (10.5 PPG AT WINDOW)
- ROP: 15 - 30 FT/HR, WOB: 2 - 3.8 KLBS
- AT 9,020' PUMP 5 BBLS LO / HI VIS SWEEPS
AROUND.
AT 9,110' PULL 150' WIPER TRIP, CLEAN
PASS UP AND DOWN.
Printed 11/612017 1:31:13PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 7 of 9
Common Well Name: 04-38 APE No
Event Type: RE-ENTER- ONSHORE (RON) Stan Date. 10/8/2017 End Date. 10/15/2017 X3-018JR-C: (2,406,171.00 )
Project: Prudhoe Bay Site: nibs 04
Rig Name/No.: CDR -2 Spud Date/rims: a/21/1991 12:00 OOAM Rig Release:
Active datum: KB @53.00usft (abo
Date From - To
10/13/2017 00:00 - 0330
Mean Sea Level)
Has Task
(hr)
3.50 DRILL
BPUOI: USA00001143
Code NPT Total Depth Phase Description of Operations
(usft)
P 9,270.00 PROD1 DRILL 3.25" BUILD FROM 9,150' MD TO 9,270'
03:30 - 06:00 2.50 DRILL P
0600 - 0730 1.50 DRILL P
07:30 - 08:45 1.25 DRILL P
MD
- FREE SPIN: 3,800 PSI, 1.72 BPM
- RATE: 1.72 BPM IN, 1.69 BPM OUT. CIRC
PRESSURE: 4,050 PSI
- MUD WEIGHT: 8.64 PPG IN, 8.69 PPG OUT,
ECD: 10.68 PPG (10.5 PPG AT WINDOW)
- ROP: 30 - 80 FT/HR, WOB: 2 - 3.8 KLBS
AT 9,220' PUMP 10 BBLS LO / HI VIS SWEEPS
AROUND.
DRILL TO END OF BUILD AT 9,270'. (8745'
_ TVD).
9,270.00 PROD1 PERFORM WIPER TRIP TO WINDOW FROM
9,270' MD
!-RATE: 1.71 BPM IN, 1.51 BPM OUT. CIRC
PRESSURE: 3,900 PSI
-PULL THROUGH WINDOWAND OPEN EDC
CIRCULATE 9.86 PPG MUD TO BIT AT 2.16
BPM / 4,200 PSI.
- AFTER 9.8# MUD IS AT THE BIT, START
POOH. MAINTAIN 10.5 PPG AT THE WINDOW
WHILE POOH. _
9,270.00 PROD? CONTINUE TO POOH.
-FLOW CHECKAT SURFACE, WELL BORE
STABLE.
- 9.8 PPG MUD IN AND OUT. (1) BBLS LOST TO
FORMATION ON TRIP OUT.
9,270.00 PROD1 BREAK OFF INJECTOR Q? 07:35 UD BUILD
SECTION BHA.
- GRADE BIT, 3 - 2 - BT - NOSE.
- MAKE UP LATERAL BHA, ADJUST MOTOR TO
6 DEG AKO.
MAKE P NEW P 104H HES BIT
12.30 - 1645 4.25 DRILL P
16'.45 - 17'.00 025 DRILL P
- CHECK SHOT @ 8850', (JORPS)
- RUN ON DOWN, SMOOTH TO BOTTOM.
- TAG 4' HIGH Q, 9265'.
9,420.00 PROD1 DRILL 3.25" LATERAL FROM 9,265' MD TO 9420
'MD
- FREE SPIN: 3,950 PSI, 1.70 BPM
RATE: 1.68 BPM IN, 1.69 BPM OUT. CIRC
PRESSURE: 4,225 PSI
I - MUD WEIGHT: 8.77 PPG IN, 8.76 PPG OUT,
ECD: 10.69 PPG (10.5 PPG AT WINDOW)
- ROP: 50 - 120 FT/HR, WOB: 1 - 3 KLBS
-UP WT -35K, DOWN WT 24K
9,420.00 PROD1 WIPER TRIP 7O 8950'.
- 35K UP, 24K DOWN, 1.74 BPM IN, 1.71 BPM
OUT
-. 45 BPM & SMOOTH GOING BACK IN.
Printed 11/6/2017 1 31 13PM *All depths reported in Drillers Depths"
U - UG
MAKE UP TO INJECTOR @ 08:40.
08'.45 - 10.45 2.00 DRILL
P
9,270.00
PROD1
TEST OTS Q? 3500 PSI / 5 MIN / OK.
- RIP! W1 LATERAL SECTION BHA.
10.45 - 10'.55 0.17 DRILL
P
9,270.00
PROD1
LOG TIE IN W/ GAMMA F/8470'-8595'
- LOG @ 3 FPM , MINUS 21' CORRECTION.
-CLOSE EDC, RUN THRU WINDOW, SMOOTH
10.55 - 12'.30 1.58 DRILL
P
9,270.00
PROD1
CONTINUE IN HOLE.
12.30 - 1645 4.25 DRILL P
16'.45 - 17'.00 025 DRILL P
- CHECK SHOT @ 8850', (JORPS)
- RUN ON DOWN, SMOOTH TO BOTTOM.
- TAG 4' HIGH Q, 9265'.
9,420.00 PROD1 DRILL 3.25" LATERAL FROM 9,265' MD TO 9420
'MD
- FREE SPIN: 3,950 PSI, 1.70 BPM
RATE: 1.68 BPM IN, 1.69 BPM OUT. CIRC
PRESSURE: 4,225 PSI
I - MUD WEIGHT: 8.77 PPG IN, 8.76 PPG OUT,
ECD: 10.69 PPG (10.5 PPG AT WINDOW)
- ROP: 50 - 120 FT/HR, WOB: 1 - 3 KLBS
-UP WT -35K, DOWN WT 24K
9,420.00 PROD1 WIPER TRIP 7O 8950'.
- 35K UP, 24K DOWN, 1.74 BPM IN, 1.71 BPM
OUT
-. 45 BPM & SMOOTH GOING BACK IN.
Printed 11/6/2017 1 31 13PM *All depths reported in Drillers Depths"
North America - ALASKA - Bla Page 8 of 9
Operation Summary Report
Common Well Name. 04-38 AFE No
Event Type: RE -ENTER -ONSHORE IRON) Start Date: 101812017 End Date 10/15/2017 X3-018JR-C: (2,406,171.001
Project: Prudhoe Bay Site: PB DS 04
Rig Name/No.: CDR -2 Spud Date/Time: 8/21/1991 12:00 OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001143
Active datum: KB @53.00usft (above
Mean Sea Level)
Date From - To
Him Task
Code NPT Total Depth
Phase Description of Operations
_
(hr)
_. (usft)
17:00 - 21:20
4.33 DRILL
.
P 9,730.00
PROD? DRILL 3.25' LATERAL FROM 9,420' MD TO
9,730' MD
- FREE SPIN: 4,050 PSI, 1.70 BPM
- RATE: 1.69 BPM IN, 1.66 BPM OUT. CIRC
I PRESSURE: 4,285 PSI
- MUD WEIGHT: 8.69 PPG IN, 8.73 PPG OUT,
ECD: 10.76 PPG (10.5 PPG AT WINDOW)
-ROP: 80 - 120 FT/HR, WOB: i-3 KLBS
-UP WT -35K, DOWN WT 24K
-AT9,520'PUMP S BBLS LO/HI VIS SWEEPS.
SWEEPS BRING BACK ABOUT 20% EXCESS
CUTTINGS.
- AT 9,570' PULL WIPER BACK TO 9,170'.
CLEAN PASS UPAND DOWN, REDUCE PUMP
'RATE THROUGH SHALES.
- AT 9,700' PUMP 10 BBLS LO / HI VIS
SWEEPS.
_
- DRILL TO 9,730'.
21:20 - 00:00
2.67 DRILL
P 9,730.00
PROD1 PERFORM LONG WIPER TRIP TO WINDOW
FROM 9,730'
- RATE: 1.71 BPM IN, 1.53 BPM OUT. CIRC
PRESSURE: 4,020 PSI
- REDUCE RATE THROUGH SHALE ZONES
- PULL THROUGH WINDOWAND OPEN EDC,
PUMP 1 B/U WHILE TIE IN DEPTH.
-CORRECT +0.5'.
- CLOSE EDC, RIH. _
10/14/2017 00.00 - 04:30
4.50 DRILL
P 9,730.00
PROD1 DRILL 3.25"LATERAL FROM 9,730'MD TO
9,890' MD
- FREE SPIN: 3,950 PSI, 1.71 BPM
- RATE: 1.68 BPM IN, 1.63 BPM OUT. CIRC
PRESSURE: 4,190 PSI
- MUD WEIGHT: 8.72 PPG IN, 8.75 PPG OUT,
ECD: 10.66 PPG (10.5 PPG AT WINDOW)
- ROP: 50- 100 FT/HR, WOB: 1 - 3.6 KLBS
- UP AT 35K, DOWN WT 24K
-AT 9,820' PUMP 5 BBLS LO / HI VIS SWEEPS
AROUND.
- PAST 9,800' STARTING TO STRUGGLE WITH
WEIGHT TRANSFER, INCREASE NXS-LUBE BY
0.25% TO BRING TOTAL LUBE
CONCENTRATION TO 3.0%.
- CONDUCT FREQUENT SHORT PICKUPS.
0430 - 0445
0.25 DRILL
P 9,730.00
PROW WIPER TRIP FROM 9,890' TO 9,780'.
- 34K UP, 20K DOWN, 1.75 BPM IN, 1.76 BPM
OUT
- CLEAN PASS UP AND DOWN.
0445 - 0600
1.25 DRILL
P 9,730.00
PROD1 DRILL 3.25" LATERAL FROM 9,890'MD TO
9,985' MD
- FREE SPIN: 4,000 PSI, 1.69 BPM
- RATE: 1.69 BPM IN, 1.67 BPM OUT. CIRC
PRESSURE: 4,220 PSI
- MUD WEIGHT: 8.73 PPG IN, 8.80 PPG OUT,
ECD: 10.74 PPG (10.5 PPG AT WINDOW)
- ROP: 50 - 100 FT/HR, WOB: 1 - 3 KLBS
Printed 1182017 1:31:13PM 'All depths reported in Drillers Depths'
North America - ALASKA - SP
Operation Summary Report
Common Well Name: 04-38
- - -- - ---
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/6/2017 End Date. 10/15/2017
Project: Prudhoe Bay Site: PB DS 04
Rig Name/No.: CDR -2 Spud Datelrime: 8/21/1991 120000AM
Active datum: KB @53.00usft (abc
Date From - To
06:00 - 10:30
Mean Sea Level)
Him Task Code
(hr)
4.50 DRILL P
10'.30 - 17'.30 7.00 DRILL P
17:30 - 2200 4.50
2200 - 0000 2.00
DRILL P
DRILL P
Page 9 of 9
AFE No
X3-018JR-G (2,406,171.00)
Rig Release:
BPUOI: USA00001143
NPT Total Depth
Phase Description of Operations
(usft)
10,069.00
PRODt DRILL 3.25' LATERAL FROM 9,985' MD TO
10,073' MD
-FREE SPIN: 4,000 PSI, 1.89 BPM
- RATE: 1.69 BPM IN, 1.67 BPM OUT. CIRC
PRESSURE: 4,220 PSI
- MUD WEIGHT: 8.73 PPG IN, 8.80 PPG OUT,
ECD: 10.74 PPG (10.5 PPG AT WINDOW)
- ROP: 50 - 100 FT/HR, WOB: 1 - 3 KLBS
- TD CALLED BY TOWN GEOLOGIST.
- PERFORM BREAKOVER EXERCISES (3).
-W/ 24K SET DOWN, PICK UP TO
BREAKOVER @ 30 FPM, (10')
- W/ 15K SET DOWN, PICK UP TO BREAK
OVER @ 30 FPM, (8')
- W/ 10K SET DOWN, PICK UP TO BREAK
OVER @ 30 FPM, (6').
- 22K DOWN WT, 32K UP WT. 8.8 PPG MUD,
PUMPING 1.7 BPM @ 4000 PSI.
10,069.00
PROD1 WIPER TRIP TO THE SWAB VALVE.
- W/ LO VIS / HIS VIS SWEEPAHEAD OF THE
BIT.
'- POOH TO WINDOW, OPEN EDC AND BRING
ON PUMPS, MAX RATE.
- 2.2 BPM, 4150 PSI, POOH @ 50 FPM. (2)
JOGS THRU 5 1/2" SECTION.
- LOSS RATE DURING THIS OPERATION, 1/2
BPH.
- RBIH FROM SWAB. TIE IN W/ GAMMA, -14'
CORRECTION.
-THRU WINDOW, OK. CLOSE EDC INTO OPEN
HOLE 25 FPM.
- PUMPING 1.7 BPM, 1.83 BPM OUT, 3950 PSI,
HOLDING AS DRILLED TOOL FACE.
_- TAG AT 10,069' CORRECTED DRILLED To
10,069.00
PROD1 PICK UP SLOWLY, PUMP 10 BBLS HI -VIS
SWEEP OUT, CONDUCT DYNAMIC FLOW
CHECK NEAR BOTTOM, WELL IS STATIC.
WIPER TRIP BACK TO WINDOW, CLEAN
PASS.
PUMP HIGH VIS PILL TO SURFACE AT 2.2 BPM
/ 4,230 PSI.
RUN BACK TO BOTTOM, CLEAN PASS.
LAY IN BEAD PILL WITH NEW MUD TO
WINDOW.
PULL THROUGH WINDOWAND OPEN EDC,
PUMP 9.8# MUD TO SURFACE AT 2.13 BPM /
4,200 PSI.
10,069.00
PROD1 WITH 9.8R MUDALLTHE WAYAROUND,
CONDUCT 4 PICKUPS AT 30 FT/MIN FROM A
DEPTH OF 8,575' WITH ZERO PUMP.
EACH TIME WEIGHT BREAKS OVER AT 37K,
STARTING AT 30K.
PICKUP DISTANCES TO BREAKOVER ARE 2.7
FT, 2.3 FT, 2.9 FT, AND 2.5 FT.
POOH
- MUD WEIGHT: 9.82 PPG tN, 9.84 PPG OUT
- RATE: 2.05 BPM IN, 1.65 BPM OUT
- PAINT FLAGS WHILE POOH.
Printed 11/6/2017 131:13PM *All depths reported in Drillers Depths'
North America - ALASKA - BP Page 1 of 18
Operation Summary Report
Common W611 Name: 04-38 AFE No
Event Type: COM- ONSHORE (CON) Start Date. 10/15/2017 End Date: 10/22/2017 X3-018JR-C: (1,134,044.00 )
Project: Prudhoe Bay Site: PB DS 04
Rig Name/No.: CDR -2
Spud Daterrime: 6/21/1991 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING
INC.
BPUOI: USA00001143
Active datum. KB @53.00usft (above Mean Sea Level)
Date From - To
Hrs
Phase
Task
Unit or
Code NPT
NPT Description of Operations
(hr)
_
Rotary
_ _ _ _
Depth _
10/15/2017 00:00 -
01:00
1.00
RUNPRD
CASING
COIL
P
FLOW CHECK 10 MIN AT BHA, STATIC.
OPEN RISER, INSPECT LAST 50' OF CT
ABOVE THE CONNECTOR. NO WEAR
SPOTS SEEN.
REMOVE INJECTOR, OFF AT 00:35
UD BHA, BIT IS 5-2.
01:00 -
01:30
0.50
RUNPRD
BOPSUR
COIL
P
FUNCTION TEST BOPS.
01:30 -
03:30
2.00
RUNPRD
CASING
COIL
P
REMOVE BHI CABLE HEAD.
BOOT E -LINE.
INSTALL 1 JT OF CSH IN WELL, MAKE UP
INJECTOR AND PUMPALL SLACK OUT.
PUMP OUT 249' OF E -LINE.
03:30 -
05:30
2.00
RUNPRD
CASING
COIL
P
REMOVE NABORS CONNECTOR AND
INSTALL BTT CONNECTOR.
- PULL TEST @ 35K, PRESSURE TEST @
_
3500 PSI, OK.
05:30 -
06:15
0.75
RUNPRD
CASING
COIL
P
PJSM. LAUNCH 3/4"STEEL BALL.
- WITH REEL POSITION @ ONE O'CLOCK
LAUNCH W/ 3500 PSI.
- HEAR BALL ROLLING, PUMP @ 3050
PSI, 40 BBLS.
_
-BALL RECOVERED
06:15 -
07:45
1.50
RUNPRD
CASING
COIL
P
RIG UP TO RUN LINER.
- VERIFY PIPE COUNT IN PIPE SHED
- RIG UP EQUIPMENT ON THE FLOOR.
- SAFETY JT W/ SAFETY VALVE IN PLACE
- PRE JOB MEETING WITH THE CREW
- EMPHASIS ON COMMUNICATION AND
NOT GETTING IN A HURRY.
07:45 -
1215
4.50
RUNPRD
CASING
COIL
P
MAKE UP SHOE TRACKAND LINER.
- MAKE UP 1ST (5) CONNECTIONS AND
DRIFT AS PER PROGRAM.
- CONDUCT WELL CONTROL DRILL
WHILE RUNNING LINER.
- SAFETY VALVE MADE UP AND
TORQUED, VALVE IN POSITION AND
CLOSED.
ALL HANDS AT STATIONS AND
REPORTED IN. TIME = 3 MIN 5 SECONDS.
WELL SECURED.
- CONTINUE RUNNING LINER AS PER
PROGRAM.
12:15 -
15:45
3.50
RUNPRD
CASING
COIL
P
MAKE UP LINER ASSEMBLY TO COIL.
- PRESSURE TEST QTS @ 3500 PSI,
GOOD TEST.
- RIH W/ LINER ASSEMBLY...23 BPM 1950
PSI.
1:31:46PM 'All depths reported in Drillers Depths'
Printed 11/6/2017 1*31:46PM 'All depths reported in Drillers Depths'
North America - ALASKA - SP
Page 2 of 18
Operation Summary Report
Common Well Name: 04-38
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 10/15/2017 End Date: 10/2212017
X3-018JR-C: (1,134,044.00 )
Project: Prudhoe Bay
Site: PB DS 04
STACKING WT REPEATEDLYAT 9,600'.
Rig Name/No.: CDR -2
Spud DateTme: 8/21/1991 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING
INC.
BPUOI: USA00001143
Active datum: KB @53.00usft (above Mean Sea Level)
Date From - To Hire
Phase Task Unit or Code NPT NPT
Description of Operations
(hr)
_ Rotary _ Depth
TRAP PRESSURE WITH CHOKE AND
15:45 - 16:15 0.50
RUNPRD CASING COIL P
CORRECT@ EDP FLAG FOR WINDOW.
WORK PIPE WITH NO PUMP.
(EDP FLAG @ 6900)
WORK PIPE DOWN TO 9,659'.
- MINUS 33' CORRECTION, DEPTH
START MINERAL OILAND SPACERS
CORRECTED ON BHI SCREEN.
- ODE NOTIFIED, PIPE IN PIPE SHED
j
RECOUNTED, ALLGOOD.
AT 9,660' WORK PIPE WITH NO PUMP,
- UP AT 38K, DOWN WT 25K. PICK UP TO
j
BREAK OVER 3'.
18.45 - 2030 1.75 RUNPRD
CASING
- BREAKOVER DETERMINED PUMPING
N DPRB 9,720.00
CONTINUE CIRCULATE MINERAL OIL TO
.23 BPM, 30 FPM PICK UP SPEED
j
-CONTINUE IN HOLE THRU WINDOW,
SMOOTH.
PSI WHILE PUMPING KCL.
- 40 FPM /.23 BPM @ 1200 PSI, 22K
WORK PIPE DOWN TO 9,724' WHILE
DCWN WT.
16:15 - 17:30
1.25
RUNPRD CASING COIL P
TAG UP @ 9720', (24N).
CASING
COIL
- FROM STACK OUT, (0 ON WT
KCL SPACER STARTING TO EXIT THE
INDICATOR), TO 41 K UP WT = 11'.
Printed 11/6/2017 1*31:46PM 'All depths reported in Drillers Depths'
- WORK PIPE AND PREPARE TO PUMP
KCL SPACER AND MINERAL O_IL.
17:30 - 18:45 1.25, RUNPRD
CASING
COIL
j N DPRB 9,720.00
STACKING WT REPEATEDLYAT 9,600'.
INCREASE WHIP TO 300 PSI TO PUT 10.5
PPG ECD AT THE WINDOW.
TRAP PRESSURE WITH CHOKE AND
WORK PIPE WITH NO PUMP.
WORK PIPE DOWN TO 9,659'.
START MINERAL OILAND SPACERS
DOWN THE CT.
AT 9,660' WORK PIPE WITH NO PUMP,
LOSING GROUND BACK TO 9,640'.
18.45 - 2030 1.75 RUNPRD
CASING
COIL
N DPRB 9,720.00
CONTINUE CIRCULATE MINERAL OIL TO
SHOE. ABLE TO GET 0.66 BPM 11,600
PSI WHILE PUMPING KCL.
WORK PIPE DOWN TO 9,724' WHILE
PUMPING OIL TO SHOE.
20.30 - 21:10 0.67 RUNPRD
CASING
COIL
N DPRB 9,720.00
KCL SPACER STARTING TO EXIT THE
SHOE.
TRAP PRESSURE AND WORK PIPE WITH
ZERO PUMP.
WORK PIPE DOWN TO 9,727' NO
FURTHER PROGRESS.
CONTINUE CIRCULATING OIL TO SHOE.
Printed 11/6/2017 1*31:46PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP Page 3 of 18
Operation Summary Report
Common Well Name. 04-38 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 10/15/2017 End Date: 10/22/2017 X3-018JR-C: (1,134.044.00)
Project: Prudhoe -Bay Site: PB DS 04
Rig Name/No.: CDR -2 Spud Daternme: 8/21/1991 12:00 OOAM Rig Release:
Rig Contractor. NABORSALASKA DRILLING INC. BPUOI: USA00001143
Active datum: KB ®53.00usft (above Mean Sea Level)
Date From - To Ars Phase Task Unit or Code NPT NPT Description of Operations
(hr) Rotary Depth
21:10 - 22:15 1.08 RUNPRD CASING COIL P DPRB 9,720.00 WITH 2 BBLS OIL OUT START WORKING
2215
- 2300
0.75
RUNPRD
CASING
N
23:00
- 00:00
1.00
RUNPRD
CASING
10/16/2017 00:00
- 01:00
1.00
RUNPRD
CASING
01:00
- 03:30
2.50
RUNPRD
CASING
03'.30 - 0430 1.00 RUNPRD CASING
04:30 - 07:00 2.50 RUNPRD CASING
0700 - 0930 2.50 RUNPRD CASING
COIL
N
DPRB
9,720.00
COIL
N
DPRB
9,720.00
COIL
N
DPRB
9,720.00
COIL
N
DPRB
9,720.00
COIL
P
DPRB
9,720.00
COIL
N
DPRB
9,720.00
COIL
N
DPRB
9,720.00
Printed 11/6/2017 1:31:46PM *All depths reported in Drillers Depths'
PIPE DOWN AT 20-30 FT/MIN.
SLOW DOWN TO KEEP RIH WEIGHT
AROUND 18K.
WORK PIPE DOWN TO 9,865'.
PARKAT 9,860' AND PUMP 3 MORE BBLS
OIL OUT.
WORK PIPE HERE, NO PROGRESS
MADE.
PUMP 2 MORE BBLS OIL OUT, TRAP
PRESSURE AND WORK PIPE WITH
PUMPS OFF.
WORK DOWN TO 9,864', STACKING HERE
3 TIMES.
PUMP 2 MORE BBLS OIL OUT, WORK
PIPE WITH PUMPS AT 0.2 BPM.
TRY VARIOUS RUNNING SPEEDS, 20 - 70
FT/MIN.
STACKING WT REPEATEDLYAT 9,860'.
PUMP REMAINING OIL OUTAT 9,855'.
WORK PIPE HERE, PUMPS ON, PUMPS
OFF VARIOUS RUNNING SPEEDS, NO
PROGRESS.
CIRCULATE AT 9,847' AT 0.67 BPM / 1,400
PSI
WORK PIPEAT MIN RATEAND ZERO
RATE, KEEP 300 PSI WHIP.
NO PROGRESS, LOST FOOTAGE BACK
TO 9,840'.
PARK HERE AND CIRCULATE OILAND
SPACERS OUT OF HOLE.
CONTINUE CIRCULATING LVT OUT OF
WELL,
ALL OIL CIRCULATED OUT OF WELL.
TRAP 300 PSI WHIP AND WORK PIPE
FROM 9,8401.
WORK PIPE DOWN TO 9,852'.
PUMP 10 BBLS KCL SPACER FOLLOWED
BY 20 BBLS LVT FOLLOWED BY 10 BBLS
KCL.
WITH 2 BBL LVT OUT, START WORKING
PIPE.
PICK UP AND WORK DOWN TO 9,885'.
CIRCULATE 7 BBLS OIL OUT AND TRAP
300 PSI, WORK DOWN TO 9,897' WITH 0
PUMP.
CONTINUE WORKING PIPE DOWN TO
9,979' WITH NO PUMP.
NO FURTHER PROGRESSAFTER LVT IS
PUMPED OUT.
CIRCULATE LVT OUT OF HOLE, HOLD 250
PSI WHP.
LINE UPAND PUMP 10 BBLS KCL, 25
BBLS MINERALOIL, 10 BBLS KCL.
- PUMPING .83 BPM @ 1680 PSI, .82 BPM
RETURN RATE.
- CHASE W/ 9.8 PPG 20K LSRV MUD
North America - ALASKA- BP
Operation Summary Report
Page 4 of 16
Common Well Name: 04-38
AFE No
Event Type: COM- ONSHORE (CON)
Start Date'. 10/15/2017 End Date: 10/22/2017
X3-018JR-C: (1,134,044.00 )
Project: Prudhoe Bay
Site: PB DS 04
Rig Name/No.: CDR -2
Spud Daternme: 8/21/1991 12'.00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001143
Active datum: KB @53.00usft (above Mean Sea Level)
Date From - To
Hire
Phase
Task Unit or Code
NET NPT
Description of Operations
- _..
(hr)
_ - Rotary _
Depth
_
09:30 - 13:45
4.25
RUNPRD
CASING COIL N
DPRB 9,72000
PJSM. WITH MINERAL OIL OUT AT
BULLNOSE, (3) BBLS BEGIN WORKING
PIPE.
- PICK UP TO UP WT, PIPE NOT FREE.
PULL TO 62K, NOT FREE.
- SET BACK DOWN, UNABLE TO GO
DOWN, WORK BACK UP TO 70K, NOT
FREE.
- CONTINUE WORKING PIPE, (CLEAN
CHAINS), AND USE VARIOUS
TECHNIQUES.
- UNABLE TO FREE PIPE UP OR DOWN.
CONSULT TOWN DURING THIS
OPERATION.
- ALL MINERAL OIL OUT, DECISION MADE
TO DISPLACE WELLTO 8.6 PPG MUD.
- CIRCULATE OUT MINERAL OILAND
- _
SPACERS HOLDING 250 PSI WELL HEAD.
13.45 - 15:15
1.50
RUNPRD
_
CASING COIL N
DPRB 9,720.00
PUMPING 8.6-8.7 PPG 42K LSRV USED
MUD.
- PRESSURE IS BAKER MAX (1700) PSI
13 BPM.
- CONSULT TOWN ODE AND AGREE TO
PUMP KCL.
15.15 - 17.30
2.25
RUNPRD
CASING COIL N
DPRB 9,720.00
START 1% SLICK KCL, (.6% BARALUBE)
DOWNHOLE.
-.17 BPM @ 1700 PSI. RATE INCREASING
TO .75 BPM / 1625 PSI W/ 30 BBLS
_PUMPED.
17:30 - 1900
1.50
RUNPRD
CASING
COIL N
DPRB 9,720.00
CT STILL STUCKAT 9,948'.
FINISH CIRCULATING WELL TO KCL.
AFTER KCLAROUND PICK UP CT TO 70K
AND DUMP WHP, NO MOVEMENT.
CYCLE PIPE 3 TIMES 3K TO 70K, NO
MOVEMENT.
19:00 - 20:00
1.00
RUNPRD
CASING COIL N
DPRB 9,720.00
PUMP20 BBLS MINERALOILTOTHE
SHOE.
20.00 - 20:30
0.50
RUNPRD
CASING COIL P
DPRB 9,720.00
PUMP S BBLS OILOUTAND SOAK FOR 15
MIN.
CYCLE PIPE TO 60K, PIPE IS FREE.
WORK PIPE DOWN TO 9,983'.
PICK UPAND WORK PIPE DOWN TO
10,006'.
KEEP 230 PSI WHP ON ITAND SOAK FOR
ANOTHER _5_MIN, NO PROGRESS.
2030 - 2200
1.50
RUNPRD
CASING COIL N
DPRB I 9,720.00
PUMP 4 MORE BBLS OUT AND SOAK FOR
15 MIN, NO PROGRESS.
PUMP 4 MORE BBLS OUT, SOAK FOR 20
MIN, WORK DOWN TO 10,007'.
CYCLE PIPE 3 TIMES HERE, NO
FURTHER PROGRESS.
PUMP REMAINING OIL OUT AND SOAK
FOR 20 MIN, NO PROGRESS.
22.00- 23:30
1.50
RUNPRD
CASING COIL N
DPRB 9,720.00
CIRCULATE OIL OUT OF WELL, HOLD 200
_
PSI WHP.
2330 - 00:00
0.50
RUNPRD
CASING COIL N
DPRB 9,720.00
ALL OIL OUT, TRY TO WORK PIPE NO
PROGRESS.
PUMP 20 BBLS LVT DOWN CT.
PUMP S BBLS OUTAND LET SOAK 15
MIN,
Printed 11/6/2017 1:31:46PM *All depths reported in Drillers Depths*
0800 - 12:30 4.50
12'.30 - 1330 1.00
1330 - 1430 1.00
14:30 - 16:30 2.00
116:30 - 17:00 0.50
17:00 - 18:00 1.00
North Arnenca - ALASKA- BP
Page 5 of 18
Operation Summary Report
Common Well Name: 04-38
FPM, 10 1/2', NO PUMP.
AFE No
Event Type: COM- ONSHORE (CON)
Start Date. 10/15/2017 End Date'. 10/22/2017
X3-018JR-C: (1,134,044.00)
Project: Prudhoe Bay
Site: PB DS 04
MOVEMENT.
Rig Name/No.: CDR -2
Spud Date/Time. 8/21/1991 12:00 OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING
INC.
BPUOI: USA00001143
Active datum: KB @53.00usft (above Mean Sea Level)
- MADE IT TO 10,039' ON (4TH)
Date From - To Hrs
Phase Task Unit or Code NPT
NPT
Description of Operations
(hr)
Rotary _
Depth
10!17/2017 W66-7-6166 3.00
RUNPRD CASING COIL N DPRB
9,720.00
WORK PIPE DOWN TO 10,004'.
- WITH (5) BBLS OUT OF BULLNOSE, LET
SOAK (30) MINUTES. _
PUMP 3 MORE BBLS OUT, LET SOAK
DPRB 9,720.00 WORK LINER DOWN TO 10,030'.
PUMP 5 MORE BBLS OUTAND LET SOAK
FOR 15 MIN, NO PROGRESS WORKING
FOR 30 MIN, WORK PIPE WITH NO
PROGRESS.
PIPE.
DPRB 9,720.00 PUMP 3 MORE BBLS LVi OUT.
SOAK FOR 30 MIN AND WORK PIPE, NO
PUMP 4 BBLS OUT, LET SOAK FOR 15
PROGRESS.
HAVE NOT MADE ANY PROGRESS WITH
MIN, NO PROGRESS.
THE LAST LVT PILL, DECISION IS MADE
TO CARRY ON WITH BALL DROP AND
PUMP REMAINING OIL OUTAND SOAK
CEMENTING. _
RUNPRD CASING COIL N
DPRB 9,720.00 CIRCULATE LVT OUT, HOLD 300 PSI
FOR 20 MIN, WORK DOWN TO 10,019'.
WHP.
_
RUNPRD CASING COIL N
DPRB 9,720.00 CONDUCT2 PICKUPS AT 30 FT/MIN
LET SOAKANOTHER 20 MIN, WORK PIPE
FROM 10K STRING WEIGHT TO 52K,
PICKUP WEIGHT WITH DRILLING BHAAT
DOWN TO 10,034'.
THIS DEPTH WAS 37K.
LET SOAK FOR 20 MIN, WORK PIPE WITH
PICKUP DISTANCE IS 12.2 FTAND 11.7
NO PROGRESS.
STACK WT BACK DOWN TO 10,026'.
RUNPRD CASING COIL P
LET SOAK FOR 20 MIN, WORK PIPE WITH
PROCEDURE FOR DROPPING BALL.
NO PROGRESS_ _
03:00 - 04:30 1.50
RUNPRD CASING COIL N DPRB
9,720.00
CIRCULATE OIL OUT, HOLD 200 PSI WHP.
0430 - 0800 3.50
RUNPRD CASING COIL P DPRB
9,720.00
PUMP 20 BBL LVT PILL INTO CT.
0800 - 12:30 4.50
12'.30 - 1330 1.00
1330 - 1430 1.00
14:30 - 16:30 2.00
116:30 - 17:00 0.50
17:00 - 18:00 1.00
Printed 111612017 1:31:46PM *All depths reported in Drillers Depths`
- W/ 5 BBLS OUT, LET SOAK (25 MIN).
- PICK UP FROM 10K DOWN TO 42K @ 30
FPM, 10 1/2', NO PUMP.
- RBIH, 35 FPM, SET DOWN, NO
MOVEMENT. REPEAT (2X), NO
MOVEMENT.
- PICK UP TO NEUTRAL, PUMP OUT (3)
MORE BBLS MINERAL OIL 8 WAIT.
- CONTINUE IN THIS FASHION UNTIL OIL
IS SPENT.
- MADE IT TO 10,039' ON (4TH)
OSCILLATION.
- LOST 7' ON THE STH AND 4 MORE ON
THE 6TH.
RUNPRD CASING COIL N
DPRB 9,720.00 CIRCULATE OUT MINERAL OIL.
- PUMP (1) MORE MINERAL OIL PILL, (25
BELS).
- WITH (5) BBLS OUT OF BULLNOSE, LET
SOAK (30) MINUTES. _
RUNPRD CASING COIL N
DPRB 9,720.00 WORK LINER DOWN TO 10,030'.
PUMP 5 MORE BBLS OUTAND LET SOAK
FOR 30 MIN, WORK PIPE WITH NO
PROGRESS.
RUNPRD CASING COIL N
DPRB 9,720.00 PUMP 3 MORE BBLS LVi OUT.
SOAK FOR 30 MIN AND WORK PIPE, NO
PROGRESS.
HAVE NOT MADE ANY PROGRESS WITH
THE LAST LVT PILL, DECISION IS MADE
TO CARRY ON WITH BALL DROP AND
CEMENTING. _
RUNPRD CASING COIL N
DPRB 9,720.00 CIRCULATE LVT OUT, HOLD 300 PSI
WHP.
_
RUNPRD CASING COIL N
DPRB 9,720.00 CONDUCT2 PICKUPS AT 30 FT/MIN
FROM 10K STRING WEIGHT TO 52K,
PICKUP WEIGHT WITH DRILLING BHAAT
THIS DEPTH WAS 37K.
PICKUP DISTANCE IS 12.2 FTAND 11.7
FT.
STACK WT BACK DOWN TO 10,026'.
RUNPRD CASING COIL P
CONDUCT PJSM AND REVIEW NABORS
PROCEDURE FOR DROPPING BALL.
DROP 5/8" BALL, LAUNCH WITH 3,000PSI.
Printed 111612017 1:31:46PM *All depths reported in Drillers Depths`
Common Well Name: 04-38
Event Type: COM- ONSHORE (CON)
North America - ALASKA- BP
Operation Summary Report
Start Date: 10/15/2017 End Date. 10/222017
Page 6 of 18 1
AFE No
X3-018JR-C:(1,134,044.00)
Project: Prudhoe Bay Site: PB DS 04
Rig Name/No.: CDR -2 Spud DateRme: 8/21/1991 12:00:OOAM Rig Release:
Active datum: KB @53.00usR (above Mean Sea Level)
Date From - To Him Phase Task
_ (hr)
18:00 - 19:30 1.50 RUNPRD CASING
19:30 22:30 3.00 RUNPRD CASING
2230 - 0000 1.50 RUNPRD EVAL
10/18/2017 00:00 - 03.00 3.00 RUNPRD EVAL
0300 - 0515 2.25 RUNPRD EVAL
05:15 - 08:15 3.00 RUNPRO EVAL
BPUOL USA00001143
Unitor Code NPT NPT Description of Operations
Rotary Depth
COIL P AFTER REEL VOLUME +5 BBLS BALL
DOESN'T LAND.
CYCLE PIPE AND PUMP.
TRY VARIOUS FLOW RATES AND
PICKING UP/ SLACKING OFF, NO LUCK.
PUMP 5 BBLS VISCOUS PILL DOWN THE
CT.
COIL P BALL IS ON SEAT, PRESSURE UP TO
3,700 PSI AND SHEAR OUT.
CONDUCT 2 PICKUPS AT 30 FT/MIN, NO
PUMP,
PICKUP 10K TO 40K WITH 9.2 FT OF
TRAVEL, NO BREAKOVER SEEN.
PICKUP 10K TO 48K WITH 10.4 FT OF
TRAVEL, NO BREAKOVER SEEN.
PICKUP WEIGHT WITH DRILLING BHA AT
THIS DEPTH WAS 37K.
PUMP 15 BBLS HI -VIS PILLAROUND,
DISCUSS PLAN FORWARD WITH ODE,
SR WSL. _
COIL N DFAL 10,029.00 AFTER HI -VIS PILL IS OUT, CONDUCT 2
MORE PICKUPS.
PICK UP TO 40K WITH 9.7' OF TRAVEL,
NO BREAKOVER.
PICK UP TO 47K WITH 10.2'OF TRAVEL,
NO BREAKOVER.
USE WELLWORC GRAPHS TO ANALYZE
PICKUPS.
COIL N DFAL 10,029.00 CONDUCT 3 MORE PICKUPS WITH 13 FT
OF TRAVEL TO DIAGNOSE IF LINER IS
RELEASED OR NOT.
ANALYZE CHARTS FROM WELLWORC TO
DETERMINE BREAKOVER POINT.
DISCUSS WITH ODE AND BOT FIELD
REPS. _
COIL N DFAL 10,029.00 MIX 30 -BBL 4% LUBE PILL WITH 40K
_SRV
- PUMP DOWN INITIALLYAT.94 BPM IN,
1515 PSI WITH SLIGHT VARYING LOSSES
TO FORMATION. INCREASE RATE TO
1.48 BPM IN, 3270 PSI WITH
APPROXIMATELY 6 BPH LOSSES TO
FORMATION. CIRCULATION PRESSURE
DROPPED TO 2980 PSI, LOSSES FELL
OFF SLIGHTLY AS PILL MOVE OUT OF
LINER AND INTO OPEN HOLE.
- MW IN 8.53 PPG, MW OUT 8.47 PPG
- WITH PILLAROUND AND ABOVE
DEPLOYMENT SLEEVE, CONDUCT
PICKUP ATTEMPTS WITH INDICATIONS
OF BREAKOVER AT 37-38K PU W V OFF
BOTTOM (TYPICAL BREAKOVER ON 2"
COIL WITH 2-3/8" LINER IS -7').
COIL N DFAL 10,029.00 SEND DATA TO ODE FOR ANALYSIS
-ANALYZE DATA, DISCUSS AMONGST
_ ENGINEERING TEAM _
Printed 11/8/2017 1:31:46PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 7 of 18
Common Well Name: 04-38
AFE No
Event Type: COM- ONSHORE (CON) Start Dale: 10/15/2017
End Date: 10/22/2017
X3-018JR-C: (1,134,044.00 )
Project: Prudhoe Bay Site: PB DS 04
Rig Name/No.: CDR -2 Spud Date/Time: 8/21/1991 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USAO0001143
Active datum: KB @53.00usft (above Mean Sea Level)
Date From - To Hrs Phase Task Unit or
Code NPT NPT
Description of Operations
(hr) Rotary
Depth
_
08:15 - 10:30 2.25 RUNPRD CEMT COIL
P
CONDITION WELL FOR CEMENT JOB
- CIRCULATE LUBE PILL COMPLETELY
OUT, OBTAIN CIRC PRESSURES WITH
CLEAN KCL ALL THE WAY AROUND.
3400-3500 PSI AT 1.5 BPM WITH INITIAL
LOSSES OF 15-24 BPH LOSSES.
- DROP RATE BACK TO 1.15 BPM WITH
LOSS RATE DROPPING TO 9 BPH
- BLOW THROUGH LINES,
DOUBLE-CHECK VALVES
- PRESSURE CROSSCHECK WITH
CEMENTER, PRESSURE TEST CEMENT
UNIT TO 4900 PSI WITH GOOD LEAK
TIGHT TEST.
- PJSM WITH CREW, CEMENTERS,
TRUCKING REP
-PRESSURE CROSSCHECK, DISCUSS
CONTINGENCY IF CEMENTERS HAVE TO
TAKE OVER DISPLACEMENT
- CREW DOWN TO UNIT TO BATCH UP
CEMENT
Printed 11/6/2017 1.31:46PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 8 of 18
Common Well Name: 04-38
AFE No
Event Type-. COM- ONSHORE (CON)
Start Date: 10/15/2017 End Date. 10/22/2017
X3-018JR-C: (1,134,044 00 )
Project: Prudhoe Bay
Site: PB DS 04
Rig Name/No.: CDR -2
Spud Date/Time: 8/21/1991 12:00:OOAM
Rig Release.
Rig Contractor: NABORSALASKA DRILLING INC.
BPUO1: USA00001143
Active datum: KB @53.00usft (above Mean Sea Level)
Date From - To Him Phase Task Unit or Code NPT
(hr) _ Rotary_ _.
10:30 - 12:30 2.00 RUNPRD CEMT COIL P
NPT Description of Operations
Dept_
MIX 16.4 BBLS OF CEMENT, PUMP 11.4
BBL
- CEMENT WETAT 1040 HRS
- CIRCULATE CEMENT DOWN WITH 8.5
PPG EXHAUST PILLATAVERAGE 1.30
BPM IN, 1.05 BPM OUT, 3870 PSI
- SHUT DOWN PUMPS AT 47.7 BBLS
AWAY (3.6 BELS BEHIND PIPE)
- LAUNCH PEE WEE DARTAND LINER
WIPER PLUG, PICK UP TO BREAKOVER
112' PER BTT REP, EXPOSE DOGS, SET
DOWN 10' HIGHER
- PUW 40K LBS
- SHIFT LINER WIPER PLUG DOWN, PICK
BACK UP 2' AND SIDE EXHAUST 5 BBLS
- SET DOWN 10KAND LAUNCH PEE WEE
DART, PRESSURE UP ON WIPER PLUG
TO 1500 PSI AND ZERO MM
- DID NOT HAVE CLEAR INDICATION THAT
LINER WIPER PLUG SHEARED BUT
CIRCULATION PRESSURES DID RISE
AND CONTINUED TO WHILE DISPLACING
LINER WIPER PLUG
- DISPLACE AT X BPM 1.25-1.30 BPM,
INITIAL CIRC PRESSURE OF 4000 PSI
DROPPED TO 3230 PSI AND ROSE TO AS
HIGH AS 4600PSI; FINAL
DISPLACEMENT PRESSURE OF 4000 PSI
- PLUG DID NOT BUMP AT CALCULATED
5.6 BELS, STOP PUMPING AT 6.15 BBLS
- OPEN CHOKE BLEEDER AND CHECK
FLOATS, GOOD TEST.
- CLOSE BLEEDER, PRESSURE UP TO
1000 PSI ON COIL, PICK UPAND
CONFIRM PRESSURE DROPAND
DISPLACEABOVE LINER TOP WITH 15
BBLS OF EXHAUST PILL
- CEMENT IN PLACE 1230 HRS
- 8.55 BBLS CEMENT BEHIND PIPE,
BASED ON CEMENT PUMPED AND
LOSSES
- TOTAL LOSSES FROM CEMENT EXIT
SHOE TO CEMENT IN PLACE: 1.7 BBLS
Printed 11/6/2017 1:31:46PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 9 of 18
Common Well Name: 04-38
AFE No
Event Type: COM -ONSHORE (CON)
Start Dale'. 10/15/2017 End Date: 10/22/2017
X3-018JR-C'. (1,13404400)
Project: Prudhoe Bay
Site: PB DS 04
Rig Name/No: CDR -2
Spud Date/Time: 8/21/1991 12:00:OOAM
Rig Release:
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI: USA00001143
Active datum: KB @53.00usft (above Mean Sea Level)
Date From - To His
Phase Task Unit or Code NPT NPT
Desoription of Operations
(hr)
Rotary _ _ Depth
_
1230 - 1715 4.75
RUNPRD CEMT COIL P
DISPLACE CEMENT WHILE POH WITH
BHA
- CONDUCT KICK WHILE TRIPPING DRILL
WITH CREW. SIMULATE PIT GAIN WITH
BHATRIPPING OUT OF HOLE AT 7000'.
DOWN ON PUMPS, NO FLOW AT SHAKER
AND MICROMOTION READINGS WERE AT
0, MUD DENSITY IN AND OUT 8,42 PPG.
. DIRECT DRILLER THAT THERE WAS
SIMULATED FLOW AT SHAKER WITH
PUMPSOFF. FOLLOWSTANDING
ORDERS, INCREASE PRESSURE ON
INJECTOR PACKOFFS AND SHUT CHOKE
SIDE HCR. CREW REPORTS TO
STATIONS TO STANDBY FOR ORDERS.
WSL REVIEWS STEPS, GIVES ALL CLEAR
FOR AAR. AAR EMPHASIS ON
IDENTIFYING DIFFERENCES IN DRILLING
TRENDSAND MONITORING TRIP
TRENDS. DISCUSSED IMPORTANCE
BEHIND USING SMALLTRIP TANKS FOR
TRIPPING SO THAT TRENDS CAN BE
SPOTTED QUICKLYAND IMPORTANCE
OF FOLLOWING SEQUENCE OF THE
STANDING ORDERS. QUESTIONED
CREW ON RESPONSE IF TOTAL PVT
VOLUMES VARY WHILE TRIP TANK
VOLUME REMAINS ACCURATE (BAD PVT
SENSORS, SURFACE LINES BEING
ADJUSTED, CENTRIFUGE ON AND OFF,
TRANSFER PUMPS INFLUENCE ON
TOTAL PVT) AND WHAT
COMMUNICATION TAKES PLACE DURING
FLUID MOVEMENT.
- CONTINUE WITH CEMENT
DISPLACEMENT
17:15 - 20:30 3.25
RUNPRD CEMT COIL P
MONITOR WELL FOR 10 MINUTES AT
BHA: STATIC
- INJECTOR OFF: 18:00
- LAY DOWN S JTS OF 2-1/16" CSH AND
SELRT RUNNING TOOL.
- TOOL HAS NOT FUNCTIONED
NORMALLY, WIPER PLUG AND PEE WEE
DARTARE STILL ON IT, AND ONE OF THE
DOGS IS PUSHED UP OUT OF POSITION.
-BTT REP INSPECT TOOLAND VERIFIES
EVERYTHING RECOVERED, NOTHING
LEFT IN HOLE.
- TAKE PHOTOS AND DISCUSS WITH ANC
TEAM, DECISION IS MADE TO MAKE A
CLEANOUT RUN.
REVIEW BHAAND OCN #5 WITH CREW.
20:30 - 21:00 0.50
OTHCMP CLEAN COIL N DFAL 10,069.00
PJSM AND REVIEW PROCEDURE FOR
MAKING UP 1" CSH.
PREP RIG FLOOR TO RUN 1" CSH.
21'00 - 22:15 1.25
OTHCMP CLEAN COIL N DFAL 10,069.00
RIG LITTLE JERKS NOTABLE TO MAKE
UP 1" CSH, THE PIPE IS TOO SMALL FOR
THEAVAILABLE DIES.
TRYTO LOCATE LITTLE JERK DIES
SOMEWHERE ON THE SLOPE THAT WILL
WORK FOR i" CSH.
Printed 11/6/2017 1:31:46PM *All depths reported in Drillers Depths'
Common Well Name. 04-38
Event Type: COM -ONSHORE (CON)
Project: Prudhoe Bay
Rio Name/No.: CDR -2
Active datum: KB @53.00usft (above Mean Sea
Date From - To We
(hr)
22:15 - 00:00 1.75
North America - ALASKA - BP Page 10 of 18
Operation Summary Report
StartDate: 10/15/2017
Site: PB DS 04
Spud DateMme:8/21/1991 is
Level)
Phase Task Unitor
Rotary
OTHCMP CLEAN COIL
10/19/2017 0000 - 0400 4.00 OTHCMP CLEAN COIL
04.00
- 07.00
3.00
OTHCMP
CLEAN
COIL
07:00
- 08:10
1.17J
OTHCMP
CLEAN
I NSTALL HEAD PIN AND CIRCULATE
COIL
08:10 - 1800 9.83 OTHCMP CLEAN COIL
AFE No
End Date 10/22/2017 X3-018JR-C:(1,134,044.00)
BPUOI: USA00001143
Code NET NPT
Description of Operations
Depth
N DEAL 10,069.00
MAKEUP BHA#5. USE COME -ALONG
WITH A LOAD CELL TO ENSURE PROPER
MAKEUP TORQUE OF EACH JOINT.
I NSTALL HEAD PIN AND CIRCULATE
THROUGH BHAAFTER 25 JTS_RAN.
N DEAL 10,069.00
CONTINUE MAKING UP BHA#5 FOR
CLEANOUT TO TD.
MAKE UP 2 JTS OF 2-1116" CSH AND BTT
LOCKABLE SWIVEL.
INJECTOR ON AT 04:00.
N DEAL 10,069.00
RIH WITH 1.75" CLEANOUT BHA#5.
- RATE: 0.29 BPM IN, 0.44 BPM OUT. CIRC
PRESSURE: 290 PSI
- MUD WEIGHT: 8.40 PPG IN, 8.43 PPG
OUT
N DEAL 10,069.00
PICK UP WEIGHTABOVE LINER TOP 36K
- CIRCULATION PRESSURE OF 1480 PSI
AT 1.0 BPM ABOVE LINER TOP
- ENTER INTO DEPLOYMENT SLEEVE,
SLACK OFF WEIGHT WHILE RUNNING IN
HOLE THROUGH LINER -24K
- CIRCULATE AT 1.0 BPM, 1450-1500 PSI
- START TAKING ON SLIGHT WEIGHTAT
9720', MORE WEIGHTAND PRESSURE
INCREASES WHILE WASHING DOWN
- PUMP TRIP WENT OFF, LOST
CIRCULATION. BACK ON WITH PUMPS
WHILE ALSO PICKING UP, SEEMINGLY
FREE. PICKUP AGAIN, FREE, ATTEMPT
TO MOVE FORWARD, MOVE -10', NO
MOVEMENT, PICKUP, NO MOVEMENT.
- EVALUATE, SEEMINGLY MECHANICALLY
STUCK ABOVE BHA.
N DEAL 10,069.00
ATTEMPT TO FREE PIPE
- USE VARYING CIRCULATION RATES
AND HI -VIS PILLS TO WORK PIPE FREE
- MAX PICK UP WEIGHTS OF 60K
- ATTEMPTED TO CIRCULATE AT.7 BPM
AND HAD A CORRESPONDING
PRESSURE INCREASE UP TO 4200 PSI
AND HAD SUDDEN PRESSURE 2000 PSI
DECREASE AND FULL LOSSES TO SHOE.
- DROP CIRCULATION DOWN TO .1 BPM,
EVENTUALLY REGAINED MARGINAL
RETURNS
- HAVE NOT SEEN CEMENT IN RETURNS
TO THIS POINT
- CIRC DOWN HI -VIS PILL, GAINED
RETURNS OVERTIME. EVENTUALLY
ABLE TO CIRCULATE AT .58 BPM WITH
.55 BPM RETURNS, SIGNIFICANT
AMOUNT OF GROUND UP CEMENT
COMING BACK, NO CHIPS.
- DISCUSSION ON OPTIONS WITH ODE
TEAM WHILE CIRCULATING. CIRC DOWN
10 BBL HI -VIS PILL FOLLOWED BY 18 BBL
MINERAL OIL PILLAND CHASED BY 15
BBLHI-VISPILL. PUMPDOWNAT.51
BPM IN, .39 BPM OUT, 3325 PSI.
- STAGE 5 BBLS MINERAL OIL OUT OF
BHAAND LET SOAK PER
Printed 11/8/2017 1'.31:46PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 04-38 AFE No
Event Type: COM- ONSHORE (CON) Start Date. 10/15/2017 End Date: 10/22/2017 X3-018JR-C: (1,134,044.00 )
Project: Prudhoe Bay Site: PB DS 04
Rig Name/No.: CDR -2 Spud Date/time: 8/21/1991 12:00:00AM Rig Release:
Page 11 of 18
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI: USA00001143
Active datum: KB @53.00usft (above Mean Sea Level)
Date From - To
Him Phase
Task Unit or Code NPT NPT
Description or Operations
(hr)
Rotary Depth
18:00 - 19:00
1.00 OTHCMP
CLEAN COIL N DFAL 10,069.00
PUMP OIL OUT IN STAGES, ALLOW TO
SOAK AND WORK PIPE, NO MOVEMENT.
TRAP WHIP AND DUMP IT WHILE
_
WORKING PIPE, NO MOVEMENT.
19'00 - 20:00
1.00 OTHCMP
CLEAN COIL N DFAL 10,069.00
PUMP ALL REMAINING OIL OUT, CYCLE
PIPE 3 TIMES 22K TO 65K, NO
MOVEMENT.
PUMP HI -VIS OUT 0.51 / 0.34 BPM.
WITH HI -VIS OUT OF THE LINER CYCLE
PIPE 22K TO 65K 3 TIMES, NO
MOVEMENT.
2000. - 22 15
2.25 OTHCMP
CLEAN COIL N DFAL 10,069.00
CONTINUE CIRCULATING MINERAL OIL
OUT.
REGAIN FULL CIRCULATION SUDDENLY
AT 19:55, LOSEABOUT 1,000 PSI CIRC
PRESSURE.
PUMP 1.01/ 0.98 BPM AT 2,300 PSI.
WORK PIPE 2 TIMES SLOWLY WHILE
CIRCULATING.
INCREASE PUMP RATE UP TO 11.201 1.19
BPM AT 3,000 PSI. NO PIPE MOVEMENT.
GET OCN #6 AND WSUP, ETL
APPROVALTO DISCONNECT.
22:15 - 23:30
1.25
OTHCMP
CLEAN COIL N DFAL 10,069.00
CONDUCT PJSM AND REVIEW
PROCEDURE FOR DROPPING BALL.
LAUNCH 5/6" ALUMINUM BALL WITH
3,500 PSI.
BALL IS NOT HEARD ROLLING, INITIALLY.
PUMP BALLAROUND AT 1.20/1.20 BPM
AT 3,270 PSI.
AT 31 BBLS AWAY SEE 300 PSI
INCREASE, PRESSURE DOES NOT DROP
OFF.
PUMP 0.82 / 0.81 BPM AT 2,000 PSI.
23'.30 - 00:00
0.50 OTHCMP
CLEAN COIL N DFAL 10,069.00
PICKUP TO 35KAND PIPE IS FREE.
PICK UP SLOWLY 7 FT/MIN.
PRESSURING UP, SLOWLY WORK PIPE
DOWN AND UP. KEEP RATE AS HIGH AS
POSSIBLE.
POOH SLOWLY INITIALLYAROUND 5
FT/MIN. _
10/20/2017 00:00 - 00:30
0.50 OTHCMP
CLEAN COIL N DFAL 10,069.00
SLOWLY EASE RATE UPTO 1.28/1.25
BPM AT 3,800 PSI. PRESSURE UP, BRING
RATE BACK DOWN TO 1.1 BPM.
PUMP 5 BBLS MUD SWEEPAROUND.
PRESSURE UP AT 9,625', CAN'T GO
DOWN REACHING RIH WEIGHT LIMIT.
CONTINUE PUMPING 0.63 / 0.02 BPM AND
POOH AT 3 FT/MIN.
GET RETURNS BACK AROUND 9,600'.
SLOWLY INCREASE PUMP RATE.
PRESSURING UP OCCASIONALLY, EACH
TIME CAN'T MOVE DOWN.
00:30 - 02:30
2.00 OTHCMP
CLEAN COIL N DFAL 10,069.00
AFTER 9,300' PRESSURE AND PICKUP
WEIGHTSTEADYING OUT. INCREASE
TO 10 FT/MIN POOH.
VERY LITTLE COMING ACROSS SHAKER.
PUMP 10 BBLS MUD SWEEP.
Printed 11/6/2017 1:31:46PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name. 04-38 AFE No
Event Type. COM- ONSHORE(CON) Start Date: 10/15/2017 End Date: 10/22/2017 X3.018JR-C:(1,134,044,001
Protect: Prudhoe Bay Site: PB DS 04
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @53.00usR (above Mean Sea Level)
Date From - To Hire Phase
Task
(hr)
NET
0230 - 0420 1.83 OTHCMP
CLEAN
0420 - 11:00 6.67 OTHCMP
I
CLEAN
11.00 - 1615 5.25 OTHCMP
CLEAN
1615 - 18:00 175 OTHCMP
CLEAN
Printed 11/6/2017 1:31:46PM *All depths reported in Drillers Depths'
Page 12 of 18
BPUOI: USA00001143
Description of Operations
SWEEP IS OUT THE BHA.
RUN BACK IN FROM 8,700' TO
CIRCULATE OUT THE LINER.
WEIGHT CHECK AT 8,900' IS 33K,
SMOOTH PICKUP.
AT 9,130' PICKUP IS 35K, SMOOTH
PICKUP.
PUMPANOTHER 10 BBLS MUD SWEEP.
CONTINUE RIH PUMP 1.30 /1.32 BPM AT
3,580 PSI.
AT 9,300' PRESSURE INCREASES TO
3,900 PSI. WEIGHT CHECK HERE IS 35K,
SMOOTH PICKUP.
RIH AGAIN, PAST 9,320 FT PRESSURE UP
AGAIN TO 4,200 PSI AT 1.29 BPM. SLIGHT
WEIGHT SET DOWN, 1-2K.
PICK BACK UP, TRYAGAIN WITH SAME
RESULT AT THE SAME DEPTH.
DISCUSS WITH ODE, DECIDE TO POOH
FOR CLEANOUT BHA.
POOH, PULL SLOWLY UNTIL LAST MUD
SWEEP EXITS THE BHA
- PRESSURES INCREASED AS BHA GOT
CLOSER TO LINER TOP AT 8530'. CIRC
PRESSURE OF 3900-3980 PSI AT 1.28
BPM IN. PRESSURE DROP WITH BHA
EXITING LINER TOP.
- MW IN 8.55 PPG, 8.46 PPG OUT AT
LINER TOP WITH HI -VIS PILL COMING UP
HOLE TO HELP CUTTINGS OUT
- BHAABOVE LINER TOP, 1.29 BPM IN,
3550-3600 PSI CIRC PRESSURE
- SIGNIFICANT PRESSURE INCREASE TO
42004350 PSI AT 1.45 BPM. CORRELATE
TO HI -VIS SWEEP AND CONTAMINATED
CEMENT RETURNS COMING UP HOLE.
JOG DOWN TO GET BELOW IT AND TURN
AROUND TO AGAIN PULL TO SURFACE.
-PULL TO SURFACE, JOG DOWN 500'
AND POH FOR FLOW CHECK.
- FLOW CHECK AT SURFACE, ALL GOOD.
POP OFF WITH INJECTOR.
INSPECT COILAS IT IS PULLED BACK.
NO MARRING / SCARRING AT
CONNECTORAREA.
- BREAK OFF AND LAY DOWN UPPER
BHA, CHANGE OUT ELEVATORS
- LAY DOWN 1" WORK STRING AND
BREAK OFF BOT TOOLS. DISCONNECT
IN GOOD SHAPE, BALLON SEATAND
RETRIEVED.
- MU 1.875" MILL ONTO BOT TOOLS AND
1" WORK STRING PER O_CN
PRESSURE TEST QUICKTEST SUB
- RIH WITH 1.875" MILLING BHA#6 ON
1.69" BOT MOTOR
Unit or
Code
NET
NET
Rotary
Depth
COIL
N
DEAL
10,069.00
COIL
N
DEAL
10,069.00
COIL
N
DEAL
10,069.00
COIL
N
DEAL
10,069.00
Printed 11/6/2017 1:31:46PM *All depths reported in Drillers Depths'
Page 12 of 18
BPUOI: USA00001143
Description of Operations
SWEEP IS OUT THE BHA.
RUN BACK IN FROM 8,700' TO
CIRCULATE OUT THE LINER.
WEIGHT CHECK AT 8,900' IS 33K,
SMOOTH PICKUP.
AT 9,130' PICKUP IS 35K, SMOOTH
PICKUP.
PUMPANOTHER 10 BBLS MUD SWEEP.
CONTINUE RIH PUMP 1.30 /1.32 BPM AT
3,580 PSI.
AT 9,300' PRESSURE INCREASES TO
3,900 PSI. WEIGHT CHECK HERE IS 35K,
SMOOTH PICKUP.
RIH AGAIN, PAST 9,320 FT PRESSURE UP
AGAIN TO 4,200 PSI AT 1.29 BPM. SLIGHT
WEIGHT SET DOWN, 1-2K.
PICK BACK UP, TRYAGAIN WITH SAME
RESULT AT THE SAME DEPTH.
DISCUSS WITH ODE, DECIDE TO POOH
FOR CLEANOUT BHA.
POOH, PULL SLOWLY UNTIL LAST MUD
SWEEP EXITS THE BHA
- PRESSURES INCREASED AS BHA GOT
CLOSER TO LINER TOP AT 8530'. CIRC
PRESSURE OF 3900-3980 PSI AT 1.28
BPM IN. PRESSURE DROP WITH BHA
EXITING LINER TOP.
- MW IN 8.55 PPG, 8.46 PPG OUT AT
LINER TOP WITH HI -VIS PILL COMING UP
HOLE TO HELP CUTTINGS OUT
- BHAABOVE LINER TOP, 1.29 BPM IN,
3550-3600 PSI CIRC PRESSURE
- SIGNIFICANT PRESSURE INCREASE TO
42004350 PSI AT 1.45 BPM. CORRELATE
TO HI -VIS SWEEP AND CONTAMINATED
CEMENT RETURNS COMING UP HOLE.
JOG DOWN TO GET BELOW IT AND TURN
AROUND TO AGAIN PULL TO SURFACE.
-PULL TO SURFACE, JOG DOWN 500'
AND POH FOR FLOW CHECK.
- FLOW CHECK AT SURFACE, ALL GOOD.
POP OFF WITH INJECTOR.
INSPECT COILAS IT IS PULLED BACK.
NO MARRING / SCARRING AT
CONNECTORAREA.
- BREAK OFF AND LAY DOWN UPPER
BHA, CHANGE OUT ELEVATORS
- LAY DOWN 1" WORK STRING AND
BREAK OFF BOT TOOLS. DISCONNECT
IN GOOD SHAPE, BALLON SEATAND
RETRIEVED.
- MU 1.875" MILL ONTO BOT TOOLS AND
1" WORK STRING PER O_CN
PRESSURE TEST QUICKTEST SUB
- RIH WITH 1.875" MILLING BHA#6 ON
1.69" BOT MOTOR
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 04-38
Event Type. COM -ONSHORE (CON) Start Date: 10/15/2017 End Date: 10/22/2017
Project: Prudhoe Bay Site: PB DS 04
AFE No
K3-018JR-C:(1,134,044.00)
Page 13 of 18
Rig Name/No.: CDR -2 Spud DateRme: 8/21/1991 12:00 OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001143
Active datum: KB @53.00usft (above Mean Sea Level)
Date From- To Him Phase
Task Unit or Code
NPT NPT Description of Operations
(hr)
_ _ Rotary
Depth _
18:00 - 18:40 0.87 OTHCMP
CLEAN COIL N
DFAL 10,069.00 CONTINUE RIH.
LOOK FOR OLD LINER FLAG AROUND
8,359' NO TRACE OF IT SEEN.
AT 8,500' START 5 BBL SWEEP DOWN
THE CT.
WEIGHT CHECKAT LINER TOP IS 35K,
'25K SLACKOFF
PRESSURE IS 2,550 PSI AT 1.2 / 1.19
BPM.
DRY DRIFT THROUGH LINER TOP IS
CLEAN, ALL THE WAY TO 8,580'.
VERY SLIGHT BOBBLE SEEN AT 8,559',
NOT DEFINITIVE.
1840 - 2050 2.17 OTHCMP
CLEAN COIL N
DFAL 10,069.00 ENTER LINER TOP GO 701.17/1.15 BPM
AT 2,540 PSI.
- TOP OF LINER IS AT 8531' CORRECTED
MD
- TOP OF FISH (BOT CIRCULATION SUB,
1 69" MOTOR, 1.75" PARABOLIC MILL) AT
-9782' UNCORRECTED MD
RIH 10 FT/MIN.
PICKUP AT 8,630' IS CLEAN, SLIGHT SET
DOWN WITH NO MOTOR WORK.
AT 8,800' PULL 100' WIPER TRIP, CLEAN
PASS UP AND DOWN.
SET DOWN 1 KAT 8,878', PICKUP IS
CLEAN.
SEE SLIGHT MOTOR WORK WORKING
PAST THIS DEPTH.
AT 8,900' PULL 200' WIPER TRIP,
SETTING DOWN 2K AT 8,876'.
SET DOWN HERE 4 TIMES WITH NO
MOTOR WORK.
MILL FOR ABOUT 10 MIN AT THIS SPOT
WITH 2K WOB, NO PROGRESS.
PICK UP AND TRY AT 10 FT/MIN, TAG AT
8,876'.
PICK UP AND TRYAT 1 FT/MIN, 1.2 RATE,
TAG AT 6,876'.
TRY 10 FT/MIN, 1 BBL/MIN, TAG AT SAME
DEPTH.
PULL 200 WIPER AND GO BACK DOWN,
TAG AT 8,875.8' WITH 2K DOWN.
2050 - 21:10 0.33 OTHCMP
CLEAN COIL N
DFAL 10,069.00 PARKAT 8,875.8' WITH 2K DOWN
WEIGHT.
CIRCULATE 1.211.2 BPM AT 2,640 PSI
FOR 20 MIN, NO MOTOR WORK SEEN.
21:10 - 0000 2.83 OTHCMP
CLEAN COIL N
DFAL 10,069.00 PICK UP AND TRV TO PASS, TAG AT
8,876.5' AGAIN.
PULL WIPER TRIP WITH 15 BBL SWEEP
BACK ABOVE 5-1/2" LINER TO 6,600'.
PULL 20 FT/MIN UP THROUGH 5-1/2"
TUBING.
Printed 11/6/2017 1:31:46PM 'All depths reported in Drillers Depths'
North America - ALASKA -BP
Operation Summary Report
Page 14 of 18
Common Well Name: 04-38 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 10/152017 End Date: 10/22/2017 X3-018JR-O. (1,134,044.00 )
Project: Prudhoe Bay Site: PB DS 04
Rig Name/No.: CDR -2 Spud Date/Time: 8/21/1991 12:00:00AM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143
Active datum: KB @53.00usft (above Mean Sea Level)
Date From - To Him Phase Task Unit or Code NPT NPT Description of Operations
(hr) _ Rotary Depth
--
10/21/2017 00:00 - 01:30 1.50 OTHCMP CLEAN COIL N DFAL 10,069.00 SWEEP DOES NOT BRING BACKANY
Printed 11/6/2017 1*31:46PM *All depths reported in Drillers Depths`
ADDITIONAL CUTTINGS.
RUN BACK IN. UP WEIGHT IS 35KAT
8,500'.
RUN PAST LINER TOP WITH NO PUMP,
TRV TO SEE LINER TOP.
NOTHING SEEN.
RIH, STACK DOWN 2KAT 8,638'. NO
MOTOR WORK.
PICKUP IS CLEAN, GO TO 0.74 BPM
STACK OUT AT 8,640'.
PICKUP AND WORK THROUGH.
CONTINUE RIH AT 9 FT/MIN PUMP 1.1
BPM.
TAG AT 8,875.8' SET 2K DOWN. PICKUP
IS 39K.
PICK UPAND TRV AT 5 FT/MIN, TAG AT
8,875.9' SET 2K DOWN. PICKUP IS 37K.
TRV AT 0.58 BPM, 15 FT/MIN TAG AT
8,876.1 SET 2K DOWN.
BRING RATE UP TO 1.2 BPM, STOP 2 FT
ABOVE AND TRV TO MILL PAST AT 0.5
FT/MIN. KEEP 2K DOWN ON IT.
01:30 - 03:40 2.17 OTHCMP CLEAN COIL N r DFAL 10,069.00
MILL PAST TIGHT SPOT, NO MOTOR
WORK SEEN. DOWN TO 8,900' ONCE
AGAIN.
BACKREAM THROUGH TIGHT SPOTAT 1
FT/MIN. NO MOTOR WORK SEEN.
RUN BACK DOWN, NOTHING SEEN.
PUMP 10 BBLS HI -VIS SWEEP DOWN.
RIH TO 9,000' THEN BACK TO 8,900',
CLEAN PASS,
RIH TO 9,100' THEN BACK TO LINER TOP.
CLEAN PASS UPAND DOWN.
03:40 - 05:10 1.50 OTHCMP CLEAN COIL N DFAL 10,069.00
RIH TO 9,200'AND BACK TO 9,100'
CLEAN PASS UPAND DOWN.
RIH TO 9,300'AT 13 FT/MIN. PUMP 1.18/
1.25 BPM AT 2,850 PSI.
PUMPANOTHER 10 BBL SWEEP DOWN.
PULL WIPER TRIP BACK TO LINER TOP,
.
CLEAN PASS UPAND DOWN. _
05:10 - 08:45 3.58 OTHCMP CLEAN COIL N DFAL 10,069.00
RIH FROM 9,300'.
PUMP 1.17/1.23 BPM AT 2,900 PSI.
RIH WEIGHT IS 24K -25K
- CIRCULATE DOWN HI -VIS PILLAND
CONDUCT SHORT WIPER FROM 9500'
- MOVE DOWN AND CONTINUE TO WASH
PER PLAN. CIRC DOWN ANOTHER
HI -VIS PILL FROM 9625' WITH SHORT
WIPER.
- WASH DOWN AGAIN, NO ISSUES OR
PRESSURE INCREASES. HI -VIS PILL
COMING OUT OF BHA AS MILL IS AT 9750'
MD UNCORRECTED DEPTH.
Printed 11/6/2017 1*31:46PM *All depths reported in Drillers Depths`
North America -ALASKA - BP
Operation Summary Report
Page 15 of 18
Common Well Name: 04-38
AFE No
Event Type: COM -ONSHORE (CON)
Start Date: 10/15/2017 End Date: 10/22/2017
X3-018JR-C: (1,134,044.00 )
Project: Prudhoe Bay
Site: PB DS 04
Rig Name/No.: CDR -2
Spud Date/Time: 8/21/1991 12:00:OOAM
Rig Release'
Rig Contractor: NABORS ALASKA DRILLING
INC.
BPUOI: USA00001143
Active datum: KB @53.00usR (above Mean Sea Level)
Date From - To Hm
Phase Task Unit or Code NPT NPT
Description of Operations
_ (hr)_
___. Rotary ___ Depth
08:45 1.00
OTHCMP CLEAN COIL N DEAL 10,06900
PULL OFF BOTTOM WITH SWEEP
COMING AROUND
-VALIDATE FLAG DEPTH THROUGH EOP
COMPARISON TO INITIAL FLAG MARK,
CALCULATE +3' DIFFERENCE IN EOP
FLAG
- PICK UP HOLE WITH NO ISSUES. CIRC
RATE OF 1.2 BPM, 3020-3100 PSI
- PULLTO LINER TOP WITH ANOTHER
HkVIS SWEEP COMING AROUND.
APPROXIMATELY 80 PSI DROP WITH
MILL COMING OUT OF APPROXIMATE
LINER TOPAT 8530', ANOTHER 80 PSI
DROP TO 2840 PSI AS HI -VIS PILL IS OUT
OF BHA.
09:45 - 13:30 3.75
OTHCMP CLEAN COIL N DEAL 10,069.00
STAGE REEL, DROP 1/2" ALUMINUM BALL
TO SHEAR CIRC SUB
- CIRCULATE DOWN AT 1.2 BPM, 2850 PSI
WHILE BHA IS ABOVE LINER TOPAT
8490'
-BALL SEATED AND SHEARED AT 27
BBLS AWAY, 4200 PSI
- INCREASE PUMPS TO 1.67 BPM AND
BEGIN MOVEMENT BACK DOWN INTO
DEPLOYMENT SLEEVE TO ENSURE IT IS
CLEAN. COIL WEIGHT MOVING DOWN
3233K AT HIGHER CIRC RATES AND
PRESSURES. NO ISSUES MOVING INTO
SLEEVE AND PULLING BACKUP. NO
NOTICEABLE DIFFERENCE IN
PRESSURES ON MOVEMENT IN AND
THEN BACK UP.
- PICK UP CLEANING UP WELLBORE AT
1.70BPM,4000PSI. MWIN8.62PPGAND
MW OUT 8.51 PPG.
- INCREASE RATE TO 1.77 BPM IN, 1.62
BPM OUT, 4400 PSI, WHILE MOVING UP
THROUGH 5-1/2" AREA
- NOTHING TO NOTE ACROSS SHAKER
- NO ISSUES PULLING TO SURFACE.
FLOW CHECKAT SURFACE, ALL GOOD,
_
NO FLOW.
13:30 - 1690 2.50
OTHCMP CLEAN COIL N DEAL 10,069.00
_
MAKE UP PUMP IN SUBAND PUMP
FRESH WATER THROUGH WORK
STRING. LD WORK STRING. RETRIEVE
_
1/2" BALL FROM CIRC_ SUB.
16.00 - 17:00 1.00
OTHCMP CLEAN COIL P
CLEAR AND CLEAN RIG FLOOR
- MOBILIZE PERF LIFT EQUIPMENT TO
RIG FLOOR
- CONDUCT BOP FUNCTION TEST WITH
2" AND 2-3/8" TEST JOINTS, ALL GOOD
17:00 - 18:00 100
OTHCMP PERFOB COIL P
WSL VERIFY GUN LAYOUT MATCHES
PERF MEMO. VERIFY XO FOR SAFETY
JOINTAND LIFTING EQUIPMENT
FITNESS.
MU PERFORATION BHA
- 1-9/16" JRC VANN GUNS, 6 SPF, 60°
PHASING, 1.56" PERFECTA SHOT
CHARGE.
Printed 1116/2017 1:31:46PM *All depths reported in Drillers Depths*
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 04-38
Event Type: COM- ONSHORE (CON) Start Date: 10/15/2017 Eno Dale: 10/22/2017
Project: Prudhoe Bay Site: PB DS 04
AFE No
{3-018JR-O (1,134,044.00)
Page 16 of 18
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001143
Active datum: KB @53.00usft (above Mean Sea Level)
Date From - To
Hrs
Phase Task
Unitor
Code NPT
NPT Description of Operations
(hr)
Rotary
Depth
1800 - 1830
0.50
OTHCMP PERFOB
COIL
P
KICK DRILL WITH MILLER CREW.
CREW WAS IN TER PROCESS OF
PICKING UPANOTHER PERF GUN.
PERF GUN IS LAID BACK DOWN AND
SAFETY JOINT IS RUN UP TO THE RIG
FLOOR.
CREW INSTALLS THE CROSSOVER AND
SAFETY JOINTAND TORQUES IT UP.
WELL SHUT IN IS SIMULATED FROM THIS
POINT, DRILLER CORRECTLY IDENTIFIES
SHUT IN SEQUENCE.
WELL READY TO BE SHUT IN
APPROXIMATELY 3 MIN.
CONDUCT AAR WITH RIG CREW AND
HES PERFORATING CREW.
18:30 - 2000
1.50
OTHCMP PERFOB
O L
P
CONTINUE PICKING UP PERF GUNS.
2000 - 21:00
1.00
OTHCMP PERFOB T
COIL
P
M/U REMAINING 1" CSH AND BHA.
CHECK TORQUE ON FIRST AND LAST 1"
CONNECTIONS, GOOD.
MAKEUP INJECTOR, ON AT 21:00
21:00 - 2300
2.00
OTHCMP PERFOB
COIL
P
RIH WITH PERFORATING BHA#7
-RATE: 0.42 BPM IN, 0.71 BPM OUT.
CIRC PRESSURE: 810 PSI
- MUD WEIGHT: 8.50 PPG IN, 8.48 PPG
_ _
_ OUT
23:00 - 00:00
1.00
OTHCMP PERFOB
COIL
P
WEIGHT CHECK AT LINER TOP IS 36K.
VERIFY INJECTOR TRIP SETTINGS WITH
DRILLER.
RIH CAREFULLY PAST LINER TOP,
NOTHING SEEN.
10/22/2017 00:00 - 01:00
1.00
OTHCMP PERFOB
COIL
P
PICK UP TO SHOT DEPTH OF 9,718',
PLACES BOTTOM SHOT AT 9,708'.
PICK UP TO 9,649' AND WAIT FOR TOOL
TO ACTIVATE.
PUT 100 PSI ON WHP AND GET STEADY
PUMP PRESSURE.
TOOL IS OUT OF LOCKOUT AT 00:38.
GO THROUGH MOVEMENT CYCLE TO
ACTIVATE FIRING HEAD.
AFTER MOVEMENT CYCLE COMPLETED
_
MOVE TO SHOT DEPTH.
01:00 - 03:00
2.00
OTHCMP PERFOB
COIL
P
GET GOOD SHOT INDICATION FROM
FLUID LOSS AND LOSS OF WHP. NOT
MUCH SEEN ON ACOUSTIC.
POOH, CLEAN PICKUP.
POOH < 50 FT/MIN, HOLD 250 PSI WHP
WHILE INSIDE LINER.
PULLABOVE LINER TOPAND CONDUCT
10 MIN PUMPS OFF FLOW CHECK,
STATIC.
CONTINUE POOH.
PERFORATED INTERVALS:
8940'-9075' MD
9110'-9295' MD
9345'-9375' MD
9440'-9535'1013
9603'9708' MD
*All depths reported in Drillers Depths*
North America - ALASKA - BP Page 17 of 18
Operation Summary Report
Common Well Name: 04-38
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 10/15/2017
End Dale. 10/222017
X3-018JR-C: (1,134,044.00)
Project: Prudhoe Bay
Site: PB DS 04
Rig Name/No.: CDR -2
Spud
Date/time: 821/1991 12:00 OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING
INC.
BPUOI: USA00001143
Active datum: KB @53.00usR (above Mean Sea Level)
Date From - To
Hrs
Phase
Task Unit or
Code NPT NPT
Description of Operations
_
(hr)
_ Rotary
_ Depth
03:00 - 04:00
1.00
OTHCMP
PERFOB COIL
P
_ _
10 MIN PUMPS OFF FLOWCHECKAT
SURFACE IS GOOD, WELL STATIC.
CONDUCT PJSM AND REVIEW
PROCEDURE FOR LAYING DOWN 1" CSH.
OPEN RISER AND INSPECT LAST 50 FT
OF CT, NOTHING SEEN.
LAY DOWN 2-1/16" CSH AND 6 JTS OF 1"
CSH.
04:00 - 04:30
0.50
OTHCMP
PERFOB COIL
P
WITH 10 JTS 1" CSH LEFT, CONDUCT
KICK DRILL WITH JURY CREW.
CREW BRINGS SAFETY JT TO RIG
FLOOR AND TORQUES IT UP IN 2 MIN,
WELL IS READY TO SECURE.
CONDUCT AAR AFTERWARDS.
SAFETY MEETING WITH HES AND
NABORS CREW FOR LAYING DOWN
PERF GUNS.
04:30 - 0830
4.00
OTHCMP
PERFOB COIL
P
LAY DOWN REMAINING 1" CSH.
LAY DOWN FIRING HEAD AND PERF
GUNS.
08:30 - 0915
0.75
POST
BOPSUR COIL
P
_
CLEAR AND CLEAN UP RIG FLOOR AND
MOBILIZE PERF TOOLS OFF RIG
09:15 - 11:45
2.50
POST
BOPSUR COIL
P
LITTLE RED LOAD 50 BBLS 80° DIESEL
INTO REEL. RIG PUMPS TO CIRCULATE
DOWN AND LAY IN FREEZE PROTECT
FROM 2555'.
X11:45 - 12:45
1.00
POST
BOPSUR COIL
P
BREAK OFF NOZZLEASSEMBLY, INSTALL
SPV INTO TREE, VERIFY SET. FLUID
PACK WITH METHANOL, CLOSE IN
MASTER VALVE.
12:45 - 13:30
0.75
POST
BOPSUR COIL
P
HAMMER ON TWO EACH 1" CSH JOINTS
THAT CAME FROM API YARD AND NOT
RIH. DRIFTAND THEN HAMMER WITH
BRASS HAMMER AS IF IN PREPARATION
TO BE MADE UP AND RIH.
COLLECT DEBRIS
13:30 - 17:30
4.00
POST
RIGID COIL
P
E -LINE NOT VISIBLE TO CHECK
CONDITION OF BOOT. STAB ON, PUMP
FORWARD. E -LINE IS NOT VISIBLE. CUT
COIL CONNECTOR OFF PLUS 2' OF COIL,
E -LINE VISIBLE. CUT 2' MORE OF COIL,
E -LINE AT END OF COIL.
- STAB ON, PUMP BACK AT MAX RATE,
NO MOVEMENT. FINALLY GET
MOVEMENT ON THIRD TRY, PUMP UNTIL
NO MOVEMENT.
- POP OFF, CUT 281' OF COIL FOR TOTAL
OF 265' OF COIL- 1.70% SLACK IN COIL
- INSTALL NEW CONNECTOR, PULL TEST
TO 50K
17:30 - 18:40
1.17
POST
RIGID COIL
P
CONDUCT PJSM WITH RIG CREW AND
HES N2 CREW.
PUMP FRESH WATER AND CORROSION
INHIBITOR INTO THE REEL, FOLLOWED
BY 10 BELS MEOH.
WSL PERFORM PRESSURE XCHECK
VERIFICATION WITH HES NITROGEN
SUPERVISOR, AND VERIFIES PUMP
TRIPS WORKING.
Printed 11/62017 1:31:46PM •AAI depths reported in Drillers Depths`
Printed 11/8/2017 1:31:46PM •AII depths reported in Drillers Depths'
North America - ALASKA - BP
Page 18 of 18
Operation Summary Report
Common Well Name: 04-38
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 10/15/2017 End Date: 10/2212017
X3-018JR-C: (1,134,044 00 )
Project: Prudhoe Bay -
Site: PB DS 04
Rig Name/No.: CDR -2
Spud Date/time: 8/21/1991 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USAOOOOI143
_
Active datum: KB @53.00usft (above Mean Sea Level)
Date From - To Hrs
Phase Task Unit or Code NPT NPT
Description of Operations
(hr)
_ _ Rotary
18:40 - 20:00 1.33
_Depth
POST RIGID COIL P
FINISHED WITH MEOH, LINE UP VALVES
TO PUMP N2.
PUMP N2 TO PURGE REEL.
MAINTAIN 150 PSI DOWNSTREAM CHOKE
PRESSURE.
I USE RESIDUAL N2 PRESSURE TO
PURGE SURFACE LINES OUT TO TIGER
.TANK._
20:00 - 23:59 3.98
POST RIGID COIL P
USE 300 PSI COMPRESSOR TO PURGE
ALL REMAINING SURFACE LINES.
GREASE CHOKE AND STACK.
PREP TO PULL CTACROSS.
REMOVE INNER REEL HARDLINE.
- AGREE WITH ODE TEAM TO RIG
RELEASE AT MIDNIGHT DUE TO REEL
SWAP REQUIRED FOR MOVING TO NEXT
WELL
Printed 11/8/2017 1:31:46PM •AII depths reported in Drillers Depths'
10/22/2017
TWO = 0/0/0. Set 4" ISA BPV #540 with T-Bar. RDMO. ***Job Complete***
TWO = BPV/0/0. (Post CDR-2). RD temp CDR #3 upper most tree from MV & RU upper
production tree. PT'd 300 low / 5000 high, (PASSED). Charted and retained in TRP folder.
Pulled 4" ISA BPV #540 @ 123". Hung "Wellbore or Annulus is Fluid Packed" tags. RDMO.
10/24/2017
***JOB COMPLETE***. See log for details. FWHP's = VAC/0/0.
T/1/0=5/12/22 Temp= S/I (LRS Unit 70-Assist Slickline: L&T/CTD)
Pressure test liner lap - Failed. Unable to reach or maintain test pressure. Pumped 13 bbls
total to establish LLR of 1.5 bpm @ 2350 psi. Tags hung. SL in control of well upon
departure. IA OA=OTG.
10/25/2017
FWHPS=40/12/25
***WELL FOUND S/I ON ARRIVAL*** (Post CTD)
DRIFT W/ 2.70" CENT., 2.50" LIB & TAG DEPLOYMENT SLEEVE @ 8527' SLM
BRUSH DEPLOYMENT SLEEVE 2.50" BRUSH @ 8532' SLM
SET 3-1/2" LTTP IN 2.70" DEPLOYMENT SLEEVE @ 8527' SLM
LRS MIT-T FAILED, LLR OF 1.15 BPM@ 2350 PSI
PULL 3-1/2" LTTP FROM 2.70" DEPLOYMENT SLEEVE @ 8527' SLM
10/25/2017
***CONT. ON 10/26/17 WSR***
T/I/0= 7/15/15 Assist Slickline. Pump 103 bbls crude down TBG to assist SLB set LTP.
10/26/2017
***Job continues 10-27-17***
***CONTINUE WSR FROM 10/25/17 SWCP 4518*** (Post CTD)
SET WHIDDON CATCHER SUB ON 4-1/2" x 3-1/2" XO @ 5380' SLM
PULL BK-DGLV FROM ST#2 @ 5278' MD
SET BK-DGLV IN ST#2 @ 5278' MD
ATTEMPT TO RETRIEVE CATCHER FROM 5380' SLM, HANG UP IN TRSV @ 2138'
SLM, UNABLE TO PASS
ATTEMPT TO PUMP FLAPPER OPEN W/ LRS, NO LUCK
SHEAR GS, RESET CATCHER @ 5375' SLM
ABLE TO WORK GS PAST TRSV WHILE LRS PUMPS.
RAN 4-1/2" TRCF SSSV LOCK OUT TOOL TO 2141' SLM. (c/I lost 200 psi while attempting
to lock out valve)
RAN 4-1/2" TRCF SSSV LOCK OUT TOOL TO 2141' SLM.
10/26/2017
***CONTINUE WSR TO 10/27/17***
***CONTINUE WSR FROM 10/26/17 SWCP 4518***(ctd)
RAN FLAPPER CHECKER TO TRSV(open).
PULL BK-S/0 GLV FROM ST#2 @ 5263' SLM(5278' MD).
SETBK-S/O GLV IN ST#2 @ 5263' SLM(5278' MD).
PULL WHIDDON CATCHER FROM 5375' SLM.
10/27/2017
***CONTINUE WSR TO 10/28/17***
T/I/0= 255/245/25 Temp= No FL. (assist slickline). RU and PT lines, SB for SL to pull
catcher.
10/27/2017
***WSR continued to 10/28/2017.
JOB CONTINUES FROM 10-26-17 Assist Slickline. No fluids pumped. Bled back 1.3
10/27/2017
bbls crude from tb . SL in control of well at LRS departure. IA/OA=OTG. FWHP=5/117/19
Daily Report of Well Operations
04-38A
***CONTINUE WSR FROM 10/27/17 SWCP 4518***(ctd)
DRIFT W/ 35KB PACKER & PTSA DRIFT TO 8530' SLM(shear gr).
PULL 35KB PACKER & PTSA DRIFT FROM 8530' SLM
SET (ONE TRIP) 35KB PACKER & PTSA w/ XX PLUG @ 8533' SLM (TOP OF LTP @
8526' MD) min id = 1.781"
LRS PERFORM PASSING CMIT-T x IA
ATTEMPTED TO MIT -T (Failed)
EQUALIZE 2 3/8" XX PLUG @ 8528' SLM
PULLED 2 3/8" PLUG FROM 8528' SLM
10/28/2017
***WELL LEFT S/I DSO NOTIFIED ON DEPARTURE***
***WSR continued from 10/27/2017 (Assist SL) MIT -T FAILED, CMIT TxIA passed to
2284/2300. Pumped 3.8 bbls crude down Tbg. to reach test pressure. IA slowly tracked IAP,
CM IT TxIA PASSED to 2284/2300 (2400 Max applied, 2160 Target.) Loss of 23/11 psi 1st
15 min. Loss of 16/10 psi 2nd 15 min. FWHP=600/300/25. Tags hung, Casing valves OTG
10/28/2017
S -Line on location upon departure.
'WELL S/I UPON ARRIVAL*** (post ctd)
RAN FLAPPER CHECKER TO TRSV @ 2162' MD ... CONFIRMED OPEN
SET 3-1/2" LTTP @ 8532' MD
RAN 4-1/2" D & D HOLE FINDER, GOOD PRESSURE TEST @ 5251' SLM (5267'
MID) ... SUSPECT S/O LEAKING
SET 4-1/2" WHIDDON C -SUB @ 5405' MD
PULLED BK-S/O @ 5278' MD
SET BK-S/O @ 5278' MD
LRS PERFORMED MIT -T ... PASSED
PULLED 4-1/2" WHIDDON C -SUB @ 5405' MD
11/4/2017
***CONT. ON 11/5/2017 WSR***
T/I/O= 328/398/30 Temp=Sl Assist S -Line (MIT -T 2400 psi) Pumped 3.5 bbls of 70* crude
down TBG in effort to reach test pressure. Incidentally, IA tracked with TBG, TxIA 990/1020
psi.. Bled IAP down, TBG tracked, not a one way leak. Pumped 1 bbl of 70* crude while S-
pine ran D&D hole finder. Station #2 is leaking. Pumped 1.2 bbls crude down TBG to set
check screened orfice valve. Set looked good, follow up with MIT -T.
MIT -T PASSED to 2563 psi, Max Applied Pressure = 2600 psi, Target Pressure = 2400 psi.
Pressured TBG to 2600 psi with 2.3 bbls crude. TBG lost 24 psi in 1st 15 minutes and 13 psi
in 2nd 15 minutes, for a total loss of 37 psi during 30 minute test. Bled TBG to 1400 psi,
11/4/2017
returned -1 bbl. HES in control of well upon LRS departure. Tags hung.
T/I/O = 550/600/30. Temp = SI. T & IA FL (SL request). ALP = 600 psi, SI @ CV. Tbg FL
@ -500'(8 bbls). IA FL @ surface.
11/4/2017
SV, WV, SSV = C. MV = C. IA, OA = OTG. 05:20
***CONT. FROM 11/4/2017 WSR*** (post ctd)
PULLED 3-1/2" LTTP @ 8532' MD
11/5/2017
***JOB COMPLETE, WELL LEFT S/I, DSO TO FLOWBACK & TEST***
North America - ALASKA - BP
Prudhoe Bay
PB DS 04
04-38
04-38A
500292221001
Design: 04-38A
Final Survey Report
19 October, 2017
BAF IGHES
BAT
GE company
by BP BAKER
Final Survey Report F�UGHES
Grmmoa,
Company:
Norm America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 04
Well:
04-38
Wellbore:
04-38A
Design:
04-38A
Project
Prudhoe Bay, PBU, PRUDHOE
Map System:
Alaska NAD27 State Plane Zones
Geo Datum:
NAD27' OGP-Usa AK [4267'15864)
Map Zone:
NAD27.OGP-Usa AK/ Alaska zone 4[26734'1586,
SRO PB DS 04, TRA 1-15
Site Position:
From: Map
Position Uncertainty: 0.00 usft
Well 04-38, 04-38
Well Position -Ni 0.00 usft
+E1 -W 0.00 usft
Position Uncertainty 0.00 usft
Wellbore 04-38A
Northing:
Easting:
Slot Radius:
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
System Datum:N
10
5,953,265.350 usft
711,270 usft
0400 in
Northing: 59526.750 usft
Easting:712,164.070 usft
Wellhead Elev1 20.98 usft
Well 04-38
KB Q 53.00usft (04-38 ACTUAL)
KB @ 53.00usft (04-38 ACTUAL)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
Latitude:
Longitude:
Grid Convergence:
Latitude:
Longitude:
Ground Level:
70° 16'31.598 N
148° 17'27.907 W
1.61 °
70° 16'21.228 N
148° 17'1.707 W
• 18.88 usft
Magnetics
Model Name Sample Date
Declination
Dip Angle
Field Strength
(nT)
BGGM2017 11/1/2017
1776
81.00 57,491
Design
04-38A
Audit Notes:
Version:
Phase:
ACTUAL
Tie On Depth:
6,605.70
Vertical Section:
Depth From (TVD)
+N/ -S
+E/ -W
Direction
(usft)
(usft)
(usft)
(°)
3202.
0.00
0.00
250.00
10/192017 10:46:34AM Page 2 COMPASS 5000.1 Build 81D
BP (
0 by Final Survey Report
BA��r�IU` R
BAT
GE paoy
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 04
Well:
04-38
Wellbore:
04-38A
Design:
04-38A
Survey Program
Date 10/19/2017
From
To
(usft)
(usft) Survey (Wellbore) Tool Name
80.20
8,605.70 1 : Schlumberger GCT mullishot (04-38) GCT -MS
8,623.00
10,043.41 BHGE CTK MWD 3" (04-38A) MWD
Survey
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Description
Schlumberger GCT multishot
MWD - Standarlt
Well 04-38
KB @ 53.00usft (04-38 ACTUAL)
KB @ 53.00usft (04-38 ACTUAL)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg
(usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft)
3202. 0.00 0.00 3202 -20.98 \0 0.00 5,952,236.750 712,164.070 0.00
80.20 0.07 181.79 80.20 27.20 0. 0.00 5,952,236.721 712,164.070 0.15
92.10 0.07 160.94 92.10 39.10 0. 0.00 5,952,236.707 712,164.072 0.21
103.90 0.07 125.63 103.90 5 . -0.05 0.01 5,952,236.696 712,164.081 0.36
117.30 0.07 88.56 117.30 64.3 -0.06 0.02 5,952,236.692 712,164.096 0.33
131.60 0.07 48.72 731.80 \12
60 -0.05 0.04 5,952,236.698 712,784.111 0.33
145.90 0.05 1.45 145.90 90 -0.04 0.05 5,952,236.710 712,164.117 0.36
160.30 0.05 310.72 160. 30 -0.03 0.04 5,952,236.720 712,164.113 0.30
174.60 0.05 262.55 1 . 0 60 -0.03 0.03 5,952,236.723 712,164.102 0.29
188.95 0.05 211.49 18 135.95 -0.03 0.02 5,952,236.717 712,164.092 0.30
203.30 0.07 152.35 203.3 150.30 -0.05 0.02 5,952,236.704 712,164.093 0.43
217.75 0.08 100.78 217.75 164.75 -0.06 0.04 5,952,236.695 712,164.108 0.46
232.15 0.08 58.54 232.15 179.15 -0.05 0.05 5,952,236.698 712,164.126 0.40
246.60 0.05 346.09 .60 193.60 -0.04 0.06 5,952,236.710 712,164.133 0.56
260.95 0.03 7.42 260.95 207.95 -0.04 0.06 5,952,236.715 712,164.128 0.43
275.35 0.07 1 9 275.35 222.35 -0.05 0.06 5,952,236.705 712,164.129 0.55
289.75 0.10 83 289.75 236.75 -0.05 0.07 5,952,236.700 712,164.146 0.68
304.20 0.08 4 304.20 251.20 -0.04 0.09 5,952,236.709 712,164.165 0.46
318.65 0.05 17.99 318.65 265.65 -0.03 0.10 5,952,236.723 712,164.169 0.49
333.10 0.03 257.86 333.10 280.10 -0.02 0.09 5,952,236.728 712,164.163 0.38
347.50 0.05 173.13 347.50 294.50 -0.03 0.09 5,952,236.721 712,164.160 0.39
V. Sec
(usft)
0.00
001
0.01
0.01
0.00
-0.02
-003
-0.03
-0.02
-0.01
0.00
-0.01
-003
-0.04
-004
-0.04
-0.05
-0.07
-0.08
-0.08
erxrn
10/19/2017 10:46:34AM Page 3 COMPASS 5000.1 Build 81D
by BP
Final Survey Report �F�UGHES
Ewmpany
Company:
North America -ALASKA -BP
Local Co-ordinate
Reference:
Well 04-38
Project:
Prudhoe Bay
TVD Reference:
KB Q 53.00usft (04-38 ACTUAL)
Site:
PB DS 04
MD Reference:
KB @ 53.00usft (04-38
ACTUAL)
Well:
04-38
North Reference:
True
Wellbore:
04-38A
Survey Calculation
Method:
Minimum Curvature
Design:
04-38A
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
Azi (azimuth(
TVD
TVDSS
NIS
EIW
Northing
Easting
DLag
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
361.80
0.07
109.93
361.80
308.80
-0.04
0.1`0'
5,952,236.712
712,164.169
0.46
376.20
0.10
70.96
376.20
323.20
-0.04
0.14
5,952,236.714
712,164.190
0.44
390.80
0.07
26.36
390.60
337.60
-0.03
0.13`
5,952,236.726
712,164.205
0.49
405.00
0.02
314.92
405.00
352.00
-0.0
0.14
5,952,236.736
712,164.207
0.46
419.50
0.02
232.48
419.50
366.50
-0.02
0.13
5,952,236.736
712,164.203
0.18
433.90
0.05
154.01
433.90
380.90
.03
0.13
5,952,236.729
712,164.204
0.35
448.40
0.08
89.38
448.40
395.40
- 3
0.15
5,952,236.723
712,154.217
0.51
462.90
0.08
39.97
462.90
409.90
-0.
0.16
5,952,236.732
712,164.233
0.46
477.30
0.05
329.84
477.30
424.
-0.01
0.17
5,952,236.745
712,164.236
0.55
491.60
0.03
232.16
491.60
438.
-0.01
0.16
5,952,236.748
712,164.230
0.43
505.90
0.07
146.55
505.90
452.90
-0.02
0.16
5,952,236.738
712,164.232
0.52
520.20
0.08
89.86
520.20
4fi7.20
-0.02
0.18
5,952,236.732
712,164.247
0.50
534.40
0.10
49.68
534.40
1.40
-0.02
0.20
5,952,236.740
712,164.266
0.46
550.80
0.07
355.93
55
80
0.00
0.21
5,952,236.760
712,164.276
0.50
567.30
0.03
47.90
5 0
514.30
0.02
0.21
5,952,236.773
712,164.278
0.34
584.00
0.05
104.92
584.
531.00
0.02
0.22
5,952,236.774
712,164.288
0.25
600.80
0.10
83.36
600.8
547.80
0.02
0.24
5,952,236.779
712,164.308
0.42
617.60
0.12
39.0
617.60
564.60
0.04
0.26
5,952,236.800
712,164.332
0.30
634.40
0.08
359.51
634.40
581.40
0.07
0.27
5,952,236.826
712,164-342
0.46
651.30
0.03
7.99
51.30
598.30
0.08
0.27
5,952,238.842
712,164.342
0.30
668.20
0.05
".80
668.20
615.20
0.09
0.28
5,952,236.852
712,164.348
0.19
685.10
0.12
4385
685.10
632.10
0.11
0.30
5,952,236.871
712,164.364
0.42
702.10
0.15
24)56
702.10
649.10
0.15
0.32
5,952,236.905
712,164.384
0.28
719.15
0.15
,96
719.15
666.15
0.19
0.33
5,952,236.948
712,164.394
0.30
736.10
0.08
5.56
736.10
683.10
0.22
0.33
5,952,236.982
712,164,396
0.41
753.10
0.07
25.64
753.10
700.10
0.24
0.34
5,952,237.003
712,164.401
0.16
770.10
0.12
31.89
770.10
717.10
0.27
0.35
5,952,237.028
712,164.415
0.30
V. Sec
(usft)
-0.06
-0.10
-0.12
-0.12
-0.12
-0.12
-0.13
-0.15
-0.15
-0.15
-0.15
-0.16
-0.16
-0.20
-0.20
-0.21
-0.23
-0.26
-0.28
-0.29
-0.30
-0.32
-0.35
-0.37
-0.39
-0.40
-0.42
10/192017 10:46:34AM Page 4 COMPASS 5000.1 Build 81D
BP
by Final Survey Report BAT
R
GE -P.,
Company: North America - ALASKA - BP Local Coordinate Reference: Well 04-38
Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL)
Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL)
Well: 04-38 North Reference: True
Wellbore: 04-38A Survey Calculation Method: Minimum Curvature
Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Pasting DLsg
(usft) V) (°) (usft) (usft) (usft) (usft)usft
( ) (usft) (°/100usft)
787.20 0.18 21.29 787.20 734.20 a 31 05,952,237.069 712,164.433 0.39
804.30 0.20 5.43 804.30 751.30 0.36 0.3 5,952,237.124 712,164.444 0.33
821.50 0.18 359.67 821.50 768.50 0.42 0.39 5,952,237.181 712,164.445 0.16
838.70 0.17 7.82 838.70 785.70 047 0.39 5,952,237.233 712,164.447 0.16
855.90 0.18 19.52 855.90 802.90 0.52 0.40 5,952,237.284 712,164.458 0.22
873.10 0.23 23.53 873.10 820.10 .58 0.43 5,952,237.342 712,164.479 0.30
890.30 0.27 13.20 890.30 837.30 5 0.45 5,952,237.414 712,164.500 0.35
907.55 0.23 1.27 907.55 854.55 0. 0.46 5,952,237.488 712,164.508 0.38
924.75 0.20 6.26 924.75 87 0.79 0.46 5,952,237.553 712,164.510 0.21
942.00 0.20 23.65 942.00 889. 0.85 048 5,952,237.610 712,164.524 0.35
959.25 0.25 31.81 959.25 \923
5 0.91 0.51 5,952,237.671 712,164.554 0.34
978.50 0.32 25.12 976.50 0 0.98 0.55 5,952,237.748 712,164.592 0.45
993.85 0.32 14.50 993.8 5 1.07 0.58 5,952,237.839 712,164.622 0.34
1,011.15 0.28 14.17 1,05 1.16 0.61 5,952,237.928 712,164.642 0.23
1,028.50 0.23 25.19 1,0 0 975.50 1.23 0.63 5,952,238.001 712,164.665 0.40
1,045.80 0.27 32.95 1,045. 992.60 1.30 0.67 5,952,238.068 712,164.700 0.30
1,063.20 0.35 34.27 1,063.2 1,010.20 1.38 0.72 5,952,238.147 712,164.750 0.46
1,080.60 0.35 26.8 1,080.60 1,027.60 1.47 0.77 5,952,238240 712,164.802 0.26
1,098.00 0.30 18.48 1, 8.00 1,045.00 1.56 0.81 5,952,238.332 712,164.837 0.39
1,115.40 0.27 18.81 15.40 1,06240 1.64 0.64 5,952,238.415 712,164.863 0.17
1,132.80 0.30"DI
1,132.80 1,079.80 1.72 0.87 5,952,238.495 712,164.894 0.28
1,150.20 0.37 1,150.20 1,097.20 1.81 0.92 5,952,238.585 712,164.942 0.45
1,167.50 0.38 1,167.50 1,114.50 1.91 0.98 5,952,238.682 712,165.000 0.08
1,184.90 0.38 1,184.89 1,131.89 2.01 1.04 5,952,238.786 712,165.050 0.28
1,202.30 0.33 . 1,202.29 1,149.29 2.11 1.06 5,952,238.887 712,165.087 0.35
1,219.50 0.30 18.50 1,219.49 1,166.49 2.20 'Al 5,952,238.977 712,165.114 0.17
1,236.70 0.33 23.59 1,236.69 1,183.69 2.29 1.14 5,952,239.067 712,165.146 0.24
V. Sec
(usft)
-0.45
-049
-0.51
-0.53
-056
-060
-0.64
-0.68
-0.70
-0.74
-079
-0.85
-0.91
-0.97
-1.01
1.0i
-1,15
-1 23
-1.30
-1.35
-1 41
-1.49
-1.58
-1.66
-1 73
-1.79
-1.85
10/192017 10:46:34AM Page 5 COMPASS 5000.1 Build 810
by BP
Final Survey Report BA.1'1�1(UGHES
1
.GE -P-,
Company:
North America - ALASKA - BP
Local Coordinate
Reference:
Well 04-38
Project:
Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Site:
PB DS 04
MD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Well:
04-38
North Reference:
True
Wellbore:
04-38A
Survey Calculation Method:
Minimum Curvature
Design:
04-38A
Database:
EDM RSK - Alaska
PROD - ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVD55
NIS
EIW
Northing
Eastin0
DLeg
(usft) (°)
(')
(usft)
(usft)
(usft)
(usft)
(usR)
(usft)
(°NOOusR)
1,253.90
0.42
29.84
1,253.89
1,200.89
2.39
1'•,19
5,952,239.168
712,165.194
0.57
1,271.10
0.52
31.77
1,271.09
1,218.09
2.51
1:�
5,952,239.291
712,165.263
0.59
1,288.30
0.58
29.42
1,288.29
1,235.29
2.65
1.35
5,952,239.435
712,165.343
0.37
1,305.80
0.58
23.66
1,305.59
1,252.59
2. 81
1.43
5,952,239.594
712,165.416
0.34
1,322.80
0.53
24.35
1,322.79
1,269.79
2.96
1.49
5,952,239.748
712,165.480
0.29
1,340.00
0.52
29.57
1,339.99
1,286.99
.10
1.57
5,952,239.890
712,165.547
0.28
1,357.30
0.55
31.95
1,357.29
1,304.29
4
1.65
5,952,240.031
712,165.626
0.22
1,374.50
0.63
32.26
1,374.49
1,321.49
3,
1.74
5,952,240.184
712,165.716
0.47
1,391.70
0.68
32.31
1,391.69
1,338
3.55
1.85
5,952,240.353
712,165.816
0.29
1,408.90
0.73
33.65
1,408.89
1,355.
3.73
1.96
5,952,240.534
712,165.926
0.31
1,426.20
0.77
32.92
1,426.18
1,373.18
3.92
2.09
5,952,240.727
712,166.045
0.24
1,443.40
0.73
31.10
1,443.38
390.38
4.11
2.21
5,952,240.921
712,166.159
0.27
1,460.60
0.72
35.47
1,460.58
7.58
4.29
2.33
5,952,241.106
712,166.273
0.33
1,477.80
0.75
41.26
1,477
1, 78
4.46
2.46
5,952,241.282
712,166.405
0.47
1,495.00
0.82
43.09
1, 98
1,441.98
4.64
2.62
5,952,241.461
712,166.559
0.43
1,512.20
0.87
42.86
1,512.
1,459.18
4.82
2.79
5,952,241.651
712,166.726
0.29
1,529.40
0.92
43.24
1,529.3
1,476.37
5.02
2.98
5,952,241.853
712,166.904
0.29
1,546.60
0.95
44,
1,546.57
1,493.57
5.22
3.17
5,952,242.060
712,167.093
0.23
1,563.60
0.95
43.51
1,563.57
1,510.57
5.43
3.37
5,952,242.268
712,167.284
0.13
1,580.70
0.92
43.84
0.67
1,527.67
5.63
3.56
5,952,242.475
712,167.471
0.18
1,597.80
0.92
.36
1,597.77
1,544.77
5.82
3.78
5,952,242.874
712,167.660
0.24
1,615.00
0.95
4 9
1,614.96
1,561.96
6.01
3.96
5,952,242.869
712,167.862
0.30
1,632.20
0.98
52
1,632.16
1,579.16
6.19
4.19
5,952,243.058
712,168.080
0.36
1,649.50
1.05
8
1,649.46
1,596.46
6.37
4.44
5,952,243.243
712,168.324
0.59
1,666.65
1.17
61.87
1,666.60
1,613.60
6.54
4.72
5,952,243.421
712,168.605
0.93
1,683.80
1.25
64.51
1,683.75
1,630.75
6.70
5.04
5,952,243.593
712,168.923
0.57
1,701.00
1.27
65.44
1,700.95
1,647.95
6.86
5.39
5,952,243.762
712,169.262
0.17
V. Sec
(usft)
-1.94
-2.05
-2.17
-2.30
-2.42
-2.53
-2.66
-2.80
-2.95
-3.12
-3.30
-3.48
-3.65
-3.84
-4.05
4,2E
-4.51
-477
-5.02
-5.27
-5 52
-578
-6.05
-6.35
-6.67
-7.03
-7.41
10/192017 10:46:34AM Page 6 COMPASS 5000.1 Build 81D
by BP BA, ICER
Final Survey Report IGHES
company
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well 04-38
Project: Prudhoe Bay
ND Reference:
KB @ 53.00usft (04-38 ACTUAL)
Site: PB DS 04
MD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Well: 04-38
North Reference:
True
Wellbore: 04-38A
Survey Calculation Method:
Minimum Curvature
Design: 04-38A
Database:
EDM R5K - Alaska
PROD - ANCP1
Survey
r
W
MD Inc
AN (axlmuD)
TVD
TVDSS
NIS
EIW
Northing
Basting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°NOOusft)
(usft)
1,718.20
1.28
67.81
1,718.14
1,665.14
702
5.74
5,952,243.924
712,169.608
0.31
-7.79
1,735.30
1.32
72.74
1,735.24
1,682.24
7.15
6.118
5,952,244.065
712,169.969
0.69
-8.18
1,752.50
1.35
79.74
1,752.43
1,699.43
7.24
649
5,952,244.171
712,170.355
0.96
-8.58
1,769.70
1.42
86.00
1,769.63
1,716.63
7.29
6.80
5,952,244.233
712,170.765
0.97
-8.98
1,786.85
1.50
80.55
1,788.77
1,733.77
7.30
7.34
5,952,244.258
712,177.207
0.82
-9.40
1,804.10
1.57
94.40
1,804.02
1,751.02
.28
7.80
5,952,244.251
772,171.863
0.72
-9.82
1,821.20
1.65
97.26
1,821.11
1,768.11
4
8.28
5,952,244.215
712,172.142
0.66
-10.25
1,838.40
1.72
99.27
1,838.30
1,785.30
7.
8.78
5,952,244.157
712,172.644
0.53
-1070
1,855.50
1.82
101.18
1,855.39
1,80
7.07
9.30
5,952,244.077
712,173.166
0.68
-11.16
1,872.70
1.92
102.66
1,872.59
1,819.
6.95
9.85
5,952,243.977
712,173.719
0.65
-11.63
1,889.90
1.95
103.63
11889.78
1,836.78
6.82
10.41
5,952,243.861
712,174.288
0.26
-12.12
1,907.00
2.02
102.86
1,906.87
853.87
6.68
10.99
5,952,243.741
712,174.868
0.44
-12.61
1,924.20
2.07
102.03
1,924.05
1.05
6.55
11.59
5,952,243.626
712,175.470
0.34
-13.13
1,941.10
2.05
102.92
1,9
1,8
6.42
12.18
5,952,243.512
712,176.067
0.22
-13.64
1,958.00
2.05
104.05
1,9 3
1,904.63
8.28
12.77
5,952,243.387
712,178.859
0.24
-14.15
-
1,974.80
2.05
105.10
1,974.
1,921.62
6.13
13.35
5,952,243.252
712,177.244
0.22
-14.64
1,991.70
2.03
106.07
1,991.5
1,936.51
5.97
13.93
5,952,243.107
712,177.828
0.24
-15.13
2,008.60
2.02
107.9
,008.40
1,955.40
5.79
14.50
5,952,242.949
712,178.404
0.39
-15.61
2,025.55
2.00
108.39
2, 5.34
1,972.34
5.60
15.07
5,952,242.775
712,178.972
0.33
-16.07
2,042.50
2.00
109.68
42.28
1,989.28
5.40
15.62
5,952,242.593
712,179.535
0.06
-16.53
2,059.45
2.02
60
2,059.22
2,008.22
5.21
18.18
5,852,242.409
712,180.100
0.12
-16.99
2,076.45
2.02
10
2
2,076.21
2,023.21
5.01
16.75
5,952,242.225
712,180.670
0.06
-17.45
2,093.35
2.02
709
2,093.10
2,040.10
4.81
17.31
5,952,242.044
712,181.238
0.00
-17.91
2,110.30
2.03
.54
2,110.04
2,057.04
4.61
17.88
5,952,241.861
712,181.808
0.08
-18.37
2,127.20
2.00
109.38
2,126.93
2,073.93
4.41
18.44
5,952,241.679
712,182.374
0.18
-18.83
2,144.15
1.98
109.26
2,143.87
2,090.87
4.22
18.99
5,952,241.500
712,182.934
0.12
-19.29
2,161.10
1.97
109.05
2,160.81
2,107.81
4.02
19.54
5,952,241.324
712,183.491
0.07
-19.74
10/19/2017 10:46:34AM
Page 7
COMPASS
5000.1 Build
810
by BP
Final Survey Report BATCER S
semi Pam
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well 04-38
Project:
Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Site:
PB DS 04
MD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Well:
04-38
North Reference:
True
Wellbore:
04-38A
Survey Calculation Method:
Minimum Curvature
Design:
04-38A
Database:
EDM R5K - Alaska PROD - ANCP7
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
N/5 E/W
Northing
Easgng
OL99
V. Sec
(usft)
N
V)
(usft)
(usft)
(usft) (usft)
(usft)
(usft)
(1OOusft)
(usft)
2,178.00
1.95
108.56
2,177.70
2,124.70
3.84
20.08
5,952,241.153
712,184.044
0.15
-20.19
2,194.95
1.95
108.22
2,194.64
2,141.64
3.68
20.64
5,952,240.987
712,184.596
0.07
-20.64
2,211.85
1.97
107.95
2,211.53
2,158.53
3.48
21.18 `
5,952,240.823
712,185.150
0.13
-21.10
2,228.80
1.97
107.88
2,228.47
2,175.47
3.30
21.74
5,952,240.660
712,185.709
0.01
-21.56
2,245.70
1.97
107.73
2,245.36
2,192.36
3.12
22.30
5,952,240.498
712,186.267
0.03
-22.02
2,252.65
1.98
107.78
2,262.30
2,209.30
.94
22.85
5,952,240.335
712,186.828
0.06
-22.48
2,279.60
1.98
107.69
2,279.24
2,226.24
23.41
5,952,240.173
712,187.391
0.02
-22.94
2,296.50
1.98
107.58
2,296.13
2,243.13
2.
23.97
5,952,240.011
712,187.852
0.02
-23.41
2,313.45
2.02
107.89
2,313.07
2,26
2.41
24.53
5,952,239.847
772,788.520
0.24
-23.87
2,330.40
2.05
107.44
2,330.01
2,277.
2.22
25.10
5,952,239.681
712,169.099
0.20
-24.35
2,347.30
2.03
106.85
2,346.90
2,283.90
2.05
25.68
5,952,239.520
712,189.678
0.17
-24.83
2,364.20
2.00
106.87
2,363.78
10.78
1.87
26.25
5,952,239.364
712,190.252
0.18
-25.30
2,380.95
2.00
106.98
2,380.5
2, .52
1.70
26.81
5,952,239.209
712,190.815
0.02
-25.77
2,397.80
2.00
107.30
2,3
2,3 6
1.53
27.37
5,952,239.052
772,191.382
0.07
-26.24
2,414.60
2.00
107.47
2,4 5
2,361.15
1.38
27.83
5,952,238.892
772,197.946
0.04
-26.71
2,431.50
1.98
107.50
2,431.
2,378.04
1.18
28.49
5,952,238.732
712,192.511
0.12
-27.17
2,448.45
1.83
108.77
2,447.98
2,394.96
7.00
29.04
5,952,238.571
772,193.066
0.32
-27.63
2,465.30
1.90
108.7
,464.82
2,411.82
0.82
29.57
5,952,238.408
712,193.605
0.21
-28.07
2,482.25
1.90
108.59
2, 1.77
2,428.77
0.64
30.10
5,952,238.243
712,194.142
0.02
-28.51
2,499.15
1.93
108.84
98.66
2,445.66
0.46
30.64
5,952,238.077
712,194.682
0.18
-28.95
2,516.10
7.93
30
2,515.60
2,462.60
0.28
31.18
5,952,237.906
712,795.226
0.09
-29.39
2,532.95
1.93
11
2,532.44
2,479.44
0.08
37.71
5,952,237.729
712,195.766
0.19
-29.83
2,549.95
1.95
11
2,549.43
2,496.43
-0.12
32.25
5,952,237.540
712,196.309
0.24
-30.26
2,566.80
1.98
.70
2,588.27
2,513.27
-0.33
32.79
5,952,237.343
712,196.852
0.20
-30.70
2,583.80
2.00
112.46
2,583.26
2,530.26
-0.55
33.33
5,952,237.137
712,197.405
0.19
-31.14
2,600.75
2.02
112.79
2,600.20
2,547.20
-0.78
33.88
5,952,236.924
712,197.960
0.14
-31.57
2,617.75
2.03
113.06
2,617.19
2,564.19
-1.02
34.44
5,952,236.705
712,198.520
0.08
-32.01
10/192017 10:46.34AM
Page 8
COMPASS
5000.1 Build BID
0b BP BAKER
P Final Survey Report rjUGHES
GC[wnpa ry
Company:
North America - ALASKA- BP
Local Coordinate Reference:
Well 04-38
Project:
Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Site:
PB DS 04
MD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Well:
0438
North Reference:
True
Wellbore:
04-38A
Survey Calculation Method:
Minimum Curvature
Design:
04-38A
Database:
EDM RSK - Alaska PROD - ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
(usft)
1°I
1')
(usft)
2634.65
2.03
114.24
2,634.08
2,651.30
2.05
115.04
2,650.71
2,867.95
2.07
115.96
2,667.35
2,684.65
2.08
117.08
2,684.04
2,701.30
2.10
118.48
2,700.68
2,717.95
2.12
120.14
2,717.32
2,734.60
2.15
121.04
2,733.96
2,751.30
2.15
121.59
2,750.65
2,767.90
2.17
122.67
2,767.24
2,784.40
2.22
124.01
2,783.72
2,800.85
2.28
125.02
2,800.26
2,817.55
2.32
126.01
2,816.85
2,834.20
2.32
126.84
2,833.48
2,850.85
2.32
127.30
2,85
2,867.50
2.33
127.96
2,8 6
2,884.15
2.32
129.81
2,863.
2,900.80
2.28
131.73
2,900.0
2,917.45
2.25
134.0
,918.67
2,934.10
2.23
136.02
2,933.30
2,950.80
2.27
136.16
49.99
712,203.967
0.43
-36.06
2,747.28
2,967.45
2.289831
5,952,233.586
2,988.83
2,984.10
2.252,983.26
783.85
4.68
3,000.80
2.25
712,205.065
2,999.95
3,017.45
2.253,016.59
-5.09
41.42
3,034.15
2.20
0.20
3,033.28
3,050.85
2.20
146.34
3,049.98
3,067.55
2.18
147.87
3,066.65
TVDSS
NIS ENV
Northing
Easting
DLeg
V. Sec
(usft)
(usft) (usft)
(usft)
(usft)
(°/100usft)
(usft)
2,581.08
-1.26
34.99
5,95$236.481
712,199.075
0.25
-32.45
2,597.71
-1.50
35.58
5,952,236.249
712,199.620
0.21
-32.87
2,614.35
-1.76
36.06
5,952,236.007
712,200.167
0.23
-33.29
2,631.04
-2.0
36.60
5,952,235.752
712,200.716
0.25
-33.70
2,847.88
-2.37
37.14
5,852,235.484
772,207.281
0.33
-34.11
2,664.32
.81
37.68
5,952,235.199
712,201.803
0.39
-34.51
2,680.96
3
38.21
5,952,234.899
712,202.346
0.27
-34.90
2,697.65
-3.
38.75
5,952,234.589
712,202.890
0.12
-35.30
2,714.
-3.59
39.28
5,952,234.271
712,203.429
0.27
-35.68
2,730.
-3.94
39.80
5,952,233.939
712,203.967
0.43
-36.06
2,747.28
-4.30
40.34
5,952,233.586
712,204.512
0.43
-36.43
783.85
4.68
40.88
5,952,233.214
712,205.065
0.34
-36.81
.48
-5.09
41.42
5,952,232.829
712,205.618
0.20
-37.18
2, 12
-5.50
41.96
5,952,232.438
712,206.167
0.11
-37.55
2,813.76
-5.91
42.50
5,952,232.041
712,206.714
0.17
-37.91 _
2,830.39
-6.33
43.02
5,952,231.632
712,207.251
0.45
-38.26
2,847.03
-6.77
43.53
5,952,231.211
712,207.769
0.52
-38.59
2,863.67
-7.22
44.01
5,952,230.777
712,208.264
0.57
-38.89
2,880.30
-7.68
44.47
5,952,230.330
712,208.737
0.49
-39.16
2,896.99
-8.15
44.92
5,952,229.871
712,209.204
0.24
-39.43
2,913.63
-8.62
45.38
5,952,229.408
712,209.677
0.10
-39.70
2,930.26
-9.10
45.84
5,952,228.945
712,210.144
0.32
-39.96
2,946.95
-9.59
46.27
5,952,228.466
712,210.592
0.79
40.20
2,963.59
-10.11
46.68
5,952,227.965
712,211.011
0.69
4041
2,980.28
-10.63
47.06
5,952,227.452
712,211.407
0.45
-40.59
2,996.96
-11.16
47.42
5,952,226.935
712,211.785
0.39
-40.75
3,013.65
-11.69
47.77
5,952,226.409
712,212.147
0.37
-40.89
10/192017 10:46:34AM Page 9 COMPASS 5000.1 Build 610
by BP
Final Survey Report �F�UGHES
cEcwnoam
Company. North America- ALASKA - BP
Local Coordinate
Reference:
Well 04-38
Project: Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Site: PB DS 04
MD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Well: 04-38
North Reference:
True
Wellbore: 04-38A
Survey Calculation Method:
Minimum Curvature
Design: 04-38A
Database:
EDM R5K - Alaska
PROD - ANCP1
Survey
v
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
ErW
Northing
Easting
DLeg
V. Bac
(usft) (°)
(°)
(usft)
(usft)
lush)
(usft)
(usft)
(usft)
(°/100usft)
Waft)
-
3,084.25
2.15
149.46
3,083.34
3,030.34
-12.23
48.10
5,952,225.879
712,212490
0.40
-41.01
3,100.95
2.13
151.31
3,100.03
3,047.03
-12.77
48.40
01
5,952,225.346
712,212.813
0.43
-41.72
3,117.70
2.13
152.29
3,116.77
3,063.77
-13.32
48.70 W
5,952,224.806
712,213.123
0.22
-41.21
3,134.40
2.13
152.88
3,133.45
3,080.45
-13.8748.98
5,952,224.264
712,213.424
0.13
-41,29
3,751.15
2.13
153.56
3,150.79
3,097.19
-14.43
49.27
5,952,223.718
712,213.720
0.15
-47.36
3,167.75
2.15
154.29
3,166.78
3,113.78
.99
49.54
5,952,223.167
712,214.008
0.20
-41.42
3,184.35
2.17
154.90
3,183.37
3,130.37
5
49.81
5,952,222.610
712,214.292
0.18
11,48
3,200.95
2.18
155.38
3,199.96
3,146.98
-16.1
50.07
5,952,222.046
712,214.573
0.13
31.54
3,217.65
2.20
155.40
3,216.65
3,16
-16.70
50.34
5,952,221.473
712,214.855
0.12
-41.59
3,234.35
2.17
155.59
3,233.33
3,180.
-17.28
50.60
5,952,220.902
712,215.135
0.18
31.64
3,251.00
2.10
158.61
31249.97
3,196.97
-17.85
50.85
5,952,220.342
712,215.402
0.48
31.68
3,267.65
2.07
158.47
3,266.61
213.61
-18.41
51.08
5,952,219.789
712,215.650
0.44
3171
3,284.30
2.07
160.13
3,283.2
3, .25
-18.97
51.30
5,952,219.233
712,215.878
0.36
-4171
3,300.95
2.05
161.62
3,2
3,2 9
-19.54
51.49
5,952,218.673
712,216.090
0.34
-4170
3,317.65
2.05
163.18
3,3 8
3,263.58
-20.77
51.67
5,952,218.109
712,216.286
0.33
-41.68
3,334.25
2.03
163.66
3,333.
3,280.17
-20.67
51.84
5,952,217.548
712,216.471
0.16
-41.6,
3,350.75
1.98
164.70
3,349.6
3,296.66
-21.23
52.00
5,952,216.997
712,216.644
0.37
-41.60
3,367.10
1.97
166.0
,366.00
3,313.00
-21.77
52.14
5,952,216.456
712,216.802
0.28
-41.55
3,383.55
1.98
188.30
3, .44
3,329.44
-22.32
52.28
5,952,275.810
712,216.953
0.09
-4149
3,399.95
1.98
166.66
98.83
3,345.83
-22.87
52.41
5,952,215.363
712,217.101
0.08
-41.43
3,416.45
1.98
.02
3,415.32
3,362.32
-23.43
52.54
5,952,214.812
712,217.246
0.08
-41.36
3,432.85
2.00
16
1
3,431.71
3,378.71
-23.98
52.67
5,952,214.261
712,217.390
0.12
-41.29
3,449.35
2.00
16
3,446.20
3,395.20
-24.55
52.80
5,952,213.704
712,217.536
0.06
31.22
3,465.75
1.98
.77
3,464,59
3,411.59
-25.10
52.93
5,952,213.154
712,217.683
0.12
-41.15
3,462.15
1.98
167.20
3,480.98
3,427.98
-25.65
53.06
5,952,212.605
712,217.826
0.09
-41.08
3,494.00
1.96
167.50
3,492.82
3,439.82
-26.05
53.15
5,952,212.211
712,217.926
0.20
-41.03
10 3l4"
10/192017 10:46:34AM Page 10 COMPASS 5000.1 Build 81D
by BP
Final Survey Report BAT(ER S
Ec°mya ry
company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 04-38
Project:
Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
SRO:
PB DS 04
MD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Well:
04-38
North Reference:
True
Wellbore:
04-38A
Survey Calculation Method:
Minimum Curvature
Design:
04-38A
Database:
EDM R5K-Alaska PROD -ANCP1
Survey
MD Inc AN (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec
(usft) (°) (°) (usft) (wtl) (usft) (usft) (usR) lush) (°1100usft( (usft)
3,498.65 1.95 167.62 3,487.47 3,444.47 -26.20 53.18 5,952,212.057 712,217.964 0.20 -41.01
3,515.05 1.85 168.22 3,513.86 3,460.86 -26.74 53.2 5,952,211.529 712,218.093 0.62 -40.94
1 3,531.45 1.75 168.05 3,530.25 3,477.25 -27.24 53.40 5,952,211.028 772,218.213 0.61 -40.86
3,547.85 1.72 167.76 3,546.84 3,493.64 -27.73 53.50 5,952,210.545 712,218.331 0.19 40.79
3,584.05 1.67 167.65 3,562.84 3,509.84 28.19 53.61 5,852,210.080 772,278446 0.31 40.73
3,580.35 1.55 167.70 3,579.13 3,526.13 .64 53.70 5,952,209.636 712,218.557 0.74 -4067
3,596.65 1.45 167.84 3,595.43 3,542.43 -2 53.79 5,952,209.222 712,218.659 0.61 -40.61
3,613.05 1.38 167.93 3,611.82 3,558.82 -29. 53.88 5,952,208.828 712,218.755 0.43 -40.56
3,628.45 1.37 168.81 3,628.22 3,57 -29.84 53.96 5,952,208.445 712,218.845 0.14 -40.50
3,645.75 1.37 170.28 3,644.51 3,591. -30.22 54.03 5,952,208.064 712,218.926 0.22 -40.43
3,662.15 1.27 169.44 3,860.91 3,607.91 -30.59 54.08 5,952,207.684 712,219.003 0.62 -40.37
3,678.50 1.18 168.15 3,677.25 24.25 -30.94 54.16 5,952,207.353 712,219.081 0.58 -40.32
3,694.90 1.15 168.79 3,693.6 3, .85 -31.26 54.23 5,952,207.029 712,219.157 0.20 -40.27
3,711.25 1.13 166.53 317 3,6 0 -31.58 54.29 5,952,206.712 712,219.229 0.73 -40.22
3,727.65 1.12 188.37 3,79 3,673.39 -31.90 54.36 5,952,206.398 712,219.303 0.06 -40.17
3,744.05 1.08 168.79 3,742. 3,889.79 -32.21 54.42 5,952,206.091 712,219.374 0.25 -40.12
3,760.45 1.03 168.46 3,759.19 3,706.19 -32.50 54.48 5,952,205.797 712,219.442 0.31 -4008
3,776.75 0.95 168.6 ,775.49 3,722.49 -32.78 54.54 5,952,205.523 712,219.505 0.49 -40.04
3,793.15 0.88 168.71 3,7 1.88 3,738.88 -33.04 54.59 5,952,205.268 712,219.564 0.43 40.00
3,809.55 0.85 188.72 08.26 3,755.28 -33.28 54.64 5,952,205.026 772,219.619 0.18 -39.96
3,825.95 0.62 .48 3,824.68 3,771.68 -33.51 54.68 5,952,204.793 712,219.669 0.24 -39.92
3,842.35 0.83 17 3,841.08 3,788.08 -33.75 54.71 5,952,204.560 712,219.711 0.76 -39.87
3,858.70 0.88 77 3,857.43 3,804.43 -33.89 54.75 5,952,204.320 712,219.752 0.31 -39.82
3,875.05 0.85 .07 3,873.77 3,820.77 -34.23 54.79 5,952,204.078 712,219.800 0.31 -38.78
3,891.45 0.77 168.24 3,880.17 3,837.17 -34.46 54.83 5,952,203.852 712,219.852 0.49 -39.74
3,907.85 0.68 168.18 3,906.57 3,853.57 -34,66 54.88 5,952,203.650 712,219.900 0.55 -39.71
3,924.25 0.65 166.02 3,922.87 3,869.97 -34.85 54.92 5,952,203.466 712,219.948 0.24 -39.69
1011912017 f0:46:34AM Page 11 COMPASS 5000.1 Build e1D
BP BA ER
by Final Survey Report F�UGHES
Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 04-38
Project: Prudhoe Bay TVD Reference: KB Q 53.00usft (04-38 ACTUAL)
Site: PB DS 04 MD Reference: KB @ 53.00usft (04.38 ACTUAL)
Well: 04-38 North Reference: True
Wellbore: 04-38A Survey Calculation Method: Minimum Curvature
Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting OLeg V. Sec
(usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/lo0usft) (usft)
3,940.65 0.63 165.44 3,939.37 3,886.37 -35.03 56 5,952,203.290 712,219.998 0.13 -39.67
3,958.95 0.63 166.46 3,955.67 3,902.87 -35.20 55.0` 5,952,203.117 712,220.046 0.07 -39.65
3,973.25 0.62 165.56 3,971.97 3,918.97 -35.37 55.05 5,952,202.946 712,220.094 0.09 -39.63
3,989.65 0.60 164.13 3,988.37 3,935.37 -35.5 55.10 5,952,202.779 712,220.144 0.15 -39.62
4,006.05 0.65 166.16 4,004.77 3,951.77 -35.71 55.14 5,952,202.607 712,220.195 0.33 -39.50
4,022.30 0.60 170.81 4,021.01 3,968.01 .89 55.18 5,952,202.435 712,220.235 0.44 -39.58
4,038.45 0.55 171.95 4,037.16 3,984.16 - 5 55.20 5,952,202.275 712,220.264 0.32 -39.54
4,054.65 0.57 164.33 4,053.36 4,000.36 -36. 55.24 5,952,202.122 712,220.301 0.48 -39.52
4,070.75 0.52 158.39 4,069.46 4,016. -36.35 55.28 5,952,201.978 712,220.354 0.47 -39.52
4,086.95 0.48 159.41 4,085.66 4,032. -36.48 55.33 5,952,201.848 712,220.408 0.25 -39.52
4,103.05 0.43 163.52 4,101.76 4,048.76 -36.60 55.38 5,952,201.728 712,220.453 0.37 -39.52
4,119.20 0.40 166.56 4,117.91 064.91 -36.71 55.41 5,952,201.616 712,220.486 0.23 -39.51
4,135.30 0.37 168.15 4,134.01 1.01 -36.82 55.43 5,952,201.511 712,220.513 0.20 -3949
4,151.45 0.33 171.62 4,15 4, 16 -36.92 55.45 5,952,201.414 712,220.533 0.28 -3948
4,167.55 0.32 173.92 4,1 6 4,113.26 -37.01 55.46 5,952,201.324 712,220.547 0.10 -39.46
4,183.70 0.32 173.52 4,182. 4,129.41 -37.10 55.47 5,952,201.235 712,220.560 0.01 -3944
4,199.85 0.35 171.93 4,198.5 4,145.56 -37.19 55.48 5,952,201.142 712,220.574 0.19 -39.42
4,216.00 0.37 172.9 4,214.71 4,161.71 -37.29 55.49 5,952,201.041 712,220.590 0.13 -39.39
4,232.20 0.33 174.99 4,230.91 4,177.91 -37.39 55.50 5,952,200.943 712,220.604 0.26 -39.37
4,248.35 0.32 177.20 47.06 4,194.06 -37.48 55.51 5,952,200.852 712,220.613 0.10 -39.34
4,284.50 0.33 .13 4,263.21 4,210.21 -37.57 55.51 5,952,200.761 712,220.619 0.07 -39.32
4,280.65 0.35 17 48 4,279.36 4,226.36 -37.67 55.52 5,952,200.665 712,220.626 0.14 -39.29
4,296.85 0.33 172/93 4,295.56 4,242.56 -37.76 55.53 5,952,200.570 712,220.038 0.20 -38.26
4,313.05 0.32 i -40 4,311.76 4,258.76 -37.85 55.54 5,952,200.480 712,220.656 0.14 -39.25
4,329.15 0.30 167.48 4,327.86 4,274.86 -37.94 55.56 5,952,200.395 712,220.677 0.13 -39.24
4,345.20 0.28 170.07 4,343.91 4,290.91 -38.02 55.58 5,952,200.316 712,220.695 0.15 -39.22 j
4,361.25 0.30 177.65 4,359.96 4,306.96 -38.10 55.59 5,952,200.236 712,220.706 0.27 -39.201
10/19/2017 10:46:34AM Page 12 COMPASS 5000.1 Build 81D
by may_ BP
'# BAKER
'Ijy� Final Survey Report F�UGHES
6Emmpany
Company: North America - ALASKA - BP
Local Co-ordinate
Reference:
Well 04-38
Project: Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Site: PB DS 04
MD Reference:
KB @ 53.00usft (0438 ACTUAL)
Well: 04-38
North Reference:
True
Wellbore: 04-38A
Survey Calculation
Method:
Minimum Curvature
Design: 04-38A
Database:
EDM R5K - Alaska
PROD - ANCPt
Survey
r
MD Inc
An (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
4,377.35
0.30
181.47
4,376.06
4,323.06
-38.18
55.59
5,952,200.152
712,220.709
0.12
-39.18
4,393.55
0.32
180.41
4,392.26
4,339.26-38.27
55.5,8
5,952,200.064
712,220.710
0.13
-39.14
4,409.70
0.35
180.64
4,408.41
4,355.41
-38.36
55.58
5,952,199.970
712,220.712
0.19
-39.11
4,425.90
0.33
183.25
4,424.61
4,371.61
-38.48
55.58
5,952,199.874
712,220.711
0.16
-39.08
4,442.05
0.27
185.84
4,440.76
4,387.76
-38.54
55.58
5,952,199.789
712,220.707
0.38
-39.04
4,458.25
0.25
186.65
4,456.95
4,403.95
.62
55.57
5,952,199.716
712,220.701
0.73
-39.01
4,474.45
0.25
189.04
4,473.15
4,420.15
- 9
55.56
5,952,199.646
712,220.693
0.06
-38.97
4,490.65
0.27
189.97
4,489.35
4,436.35
-38.
55.55
5,952,199.573
712,220.683
0.13
-38.94
4,506.85
0.35
182.97
4,505.55
4,45
-38.85
55.54
5,952,199.486
712,220.677
0.55
-38.90
4,523.00
0.42
181.99
4,521.70
4,488.
-38.96
55.53
5,952,199.377
712,220.675
0.44
-38.86
4,539.25
0.42
179.75
4,537.95
4,484.85
-38.07
55.53
5,952,199.258
712,220.877
0.10
-38.82
4,555.45
0.42
173.10
4,554.15
501.15
-38.19
55.54
5,852,199.140
772,220.887
0.30
-38.78
4,571.65
0.40
173.49
4,570.3
4, .35
-39.31
55.55
5,952,199.025
712,220.704
0.12
-38.76
4,587.90
0.40
174.47
4,5
4,5 0
-39.42
55.56
5,952,198.913
712,220.719
0.04
-38.73
4,604.10
0.37
175.68
4,6 0
4,549.80
-39.53
55.57
5,952,198.805
712,220.732
0.19
-38.70 -
4,620.30
0.33
177.55
4,619.
4,566.00
-39.63
55.58
5,952,198.706
712,220.740
0.26
-38.6-,
4,636.50
0.33
182.20
4,635.2
4,582.20
-39.72
55.58
5,952,198.613
712,220.743
0.17
-38.64
4,652.70
0.30
187.9
4,651.40
4,598.40
-39.81
55.57
5,952,198.524
712,220.738
0.27
-38.60
4,668.90
0.32
189.41
4, 7.60
4,614.60
-39.90
55.56
5,952,188.437
712,220.727
0.13
-38.56
4,685.10
0.35
187.18
83.80
4,630.80
-39.99
55.54
5,952,198.343
712,220.716
0.20
-38.52
4,701.00
0.33
.00
4,699.70
4,646.70
40.08
55.53
5,952,198.249
712,220.707
0.13
-38.47
4,716.80
0.30
19 4
4,715.50
4,662.50
40.17
55.52
5,952,188.163
712,220.694
0.24
-38.43
4,732.55
0.28
18
4,731.25
4,678.25
-40.25
55.50
5,952,198.085
712,220.679
0.13
-38.39
4,748.30
0.27
.89
4,747.00
4,694.00
-00.32
55.49
5,952,198.010
712,220.667
0.13
-38.35
4,764.20
0.28
187.21
4,762.90
4,709.90
-40.40
55.47
5,952,197.935
712,220.659
0.08
-38.31
4,780.10
0.28
188.33
4,778.80
4,725.80
40.47
55.46
5,952,197.857
712,220.651
0.03
-38.28
4,796.05
0.27
191.10
4,794.75
4,741.75
-40.55
55.45
5,952,197.782
712,220.640
0.10
-38.24
10/192017 10:46.34AM Page 13 COMPASS 5000.1 Build 81D
b BP BA ER
p Final Survey Report F�UGHES
Company:
Nor0l America - ALASKA - BP
Local Coordinate Reference:
Well 04-38
Project:
Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Site:
PB DS 04
MD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Well:
04-38
North Reference:
True
Wellbore:
04-38A
Survey Calculation Method;
Minimum Curvature
Design:
04-38A
Database:
EDM R5K-Alaska PROD -ANCPI
Survey
MD
Inc
ATI (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(•)
(usR)
(usft)
(usft)
(uslt)
(usft)
(usft)
(°7100usft)
(usft)
4,812.00
0.23
192.55
4,610.70
4,757.70
-40.62
55,44
5,952,197.713
712,220.628
0.25
-38.20
4,827.90
0.22
192.72
4,826.60
4,773.60
-40.68
554
5,952,197.652
712,220.616
0.06
-38.17
4,843.75
0.25
194.88
4,842.45
4,789.45
40.74
55.41
5,952,197.588
712,220.602
0.20
-38.13
4,859.65
0.32
192.07
4,858.35
4,805.35
40.8
55.39
5,852,197.511
712,220.586
0.45
-38.09
4,875.60
0.30
184.56
4,874.30
4,821.30
40.90
55.38
5,952,197.425
712,220.576
0.28
-38.05
4,892.70
0.27
181.10
4,891.40
4,838.40
.88
55.37
5,952,197.340
712,220.574
0.20
-38.01
4,909.90
0.25
183.44
4,908.60
4,855.60
7
55.37
5,952,197.262
712,220.573
0.13
-37.99
4,927.00
0.25
191.34
4,825.70
4,872.70
41.
55.36
5,952,187.188
712,220.566
0.20
-37.95
4,944.20
0.23
195.33
4,942.90
4,889.
41.21
55.34
5,952,197.118
712,220.551
0.15
-37.91
4,961.40
0.30
204.68
4,960.10
4,907.
41.29
55.32
5,952,197.043
712,220.525
0.48
-37.86
4,978.65
0.28
201.89
4,977.35
4,924.35
41.37
55.28
5,952,186.962
712,220.493
0.14
-37.80
4,995.90
0.25
196.44
4,984.60
941.60
-4144
55.26
5,952,186.886
712,220.469
0.23
-37.75
5,013.20
0.27
199.83
5,011.90
8.90
-41.52
55.23
5,952,186.811
712,220.446
0.15
-37.70
5,030.50
0.25
192.24
5,02
4, 20
-41.59
55.21
5,952,196.735
712,220.427
0.23
-37.65
5,047.80
0.25
191.84
5, 50
4,993.50
-41.66
55.19
5,952,196.660
712,220.413
0.01
-37.61
5,065.20
0.25
183.72
5,063.
5,010.90
-41.74
55.18
5,952,196.585
712,220.405
0.20
-37.58
5,082.50
0.30
171.23
5,081.2
5,028.20
-41.82
55.19
5,852,196.503
712,220.412
0.45
-37.58
5,099.80
0.30
167.07
,098.60
5,045.60
-41.91
55.20
5,952,196.414
712,220.431
0.13
-37.54
5,117.10
0.28
163.03
5,115.80
5,062.80
42.00
55.23
5,952,196.331
712,220.456
0.17
-37.53
5,134.30
0.28
162.95
3.00
5,080.00
42.08
55.25
5,952,196.251
712,220.483
0.00
-37.53
5,151.70
0.30
.69
5,150.40
5,097.40
42.16
55.27
5,952,196.166
712,220.507
0.18
-37.52
5,169.20
0.32
18 2
5,167.90
5,114.90
42.25
55.30
5,952,196.075
712,220.533
0.15
-37.51
5,186.60
0.32
157
5,185.29
5,132.29
-42.34
55.33
5,952,195.984
712,220.566
0.22
-37.51
5,204.10
0.30
1 5
5,202.79
5,149.79
42.43
55.37
5,952,195.899
712,220.607
0.17
-37.51
5,221.50
0.28
45.40
5,220.19
5,167.19
42.51
55.41
5,952,195.825
712,220.654
0.27
-37.53
5,238.20
0.30
140.68
5,236.89
5,183.89
42.57
55.46
5,952,195.759
712,220.707
0.19
-37.56
5,254.70
0.30
142.25
5,253.39
5,200.39
42.64
55.51
5,952,195.693
712,220.762
0.05
-3258
1011912017 10.46:34AM Page 14 COMPASS 5000.1 Build 61D
BP
0 by Final Survey Report BA,1�tt(U R
BAT
GEc ,,W
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well 04-38
Project: Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Site: PB DS 04
MD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Well: 04-38
North Reference:
True
Wellbore: 04-38A
Survey Calculation
Method:
Minimum Curvature
Design: 04-38A
Database:
EDM R5K - Alaska
PROD - ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Easgng
DLeg
V. Sec
(usft) (°)
(°I
(usft
lush)
(usft)
(usft)
(usft)
Waft)
(°/t00usft)
(usft)
5,271.60
0.30
147.30
5,270.29
5,217.29
-42.71
55.57
5,952,195.622
712,220.815
0.16
-37.61
5,288.50
0.33
149.07
5,287.19
5,234.19
-42.79
55.6
5,952,195.544
712,220.866
0.19
-37.62
5,305.50
0.38
143.54
5,304.19
5,251.79
42.88
55.67
5,952,195.459
712,220.928
0.36
-3265
5,322.40
0.38
140.05
5,321.09
5,268.09
42.97
55.74
5,952,195.373
712,220.999
0.14
-37.69
5,339.40
0.33
142.04
5,338.09
5,285.09
-03.05
55.81
5,952,195.293
712,221.088
0.30
-37.72
5,356.30
0.28
142.02
5,354.99
5,301.99
.12
55.86
5,952,195.223
772,221.125
0.30
-37.75
5,372.95
0.28
138.90
5,371.64
5,318.64
8
55.92
5,952,195.162
712,221.179
0.09
-37.77
5,389.60
0.30
140.79
5,388.29
5,335.29
-43.
55.97
5,952,195.099
712,221.235
0.13
-37.80
5,406.30
0.33
144.99
5,404.99
5,351
43.32
56.03
5,952,195.028
712,221.292
0.23
-37.83
5,423.00
0.37
142.09
5,421.69
5,368.
43.40
56.09
5,952,194.947
712,221.355
0.26
-37.86
5,439.70
0.35
137.66
5,438.39
5,385.39
43.48
56.15
5,952,194.869
712,221.425
0.21
-37.90
5,456.40
0.33
137.16
5,455.09
402.09
-43.56
56.22
5,952,194.798
712,221.494
0.12
-37.93
5,473.10
0.32
139.07
5,471.79
8.79
-43.63
56.28
5,952,194.729
712,221.559
0.09
-37.97
5,489.80
0.30
142.63
5,4
5,4 9
43.70
56.34
5,952,194.661
712,221.618
0.17
-38.00
5,506.40
0.28
145.67
5,5 9
5,452.09
43.76
56.39
5,952,194.594
712,221.669
0.15
-38.02
_
5,523.00
0.32
146.63
5,521.
5,468.69
43.84
56.44
5,952,194.524
712,221.720
0.24
-38.04
5,539.70
0.35
144.86
5,538.3
5,485.39
-43.92
56.49
5,952,194.444
712,221.777
0.19
-38.07
5,556.40
0.35
144.6
5,555.09
5,502.09
44.00
56.55
5,952,194.363
712,221.838
0.01
-38.09
5,573.15
0.33
148.15
5,518.84
44.08
56.61
5,952,194.282
712,221.895
0.17
-38.72
5,589.90
0.35
145.878.59
�5,11.84
5,535.59
44.17
56.66
5,952,194.200
712,221.952
0.14
-38.14
5,606.60
0.35
.015.29
5,552.29
-44.25
56.72
5,952,194.119
712,222.014
0.14
-38.17
5,623.40
0.33
74 6
5,622.09
5,569.09
-44.33
56.78
5,952,194.042
712,222.077
0.13
-38.20
5,640.20
0.32
145
5,638.89
5,585.89
-44.41
56.84
5,952,193.966
712,222.134
0.09
-38.22
5,656.90
0.32
.23
5,655.59
5,602.59
44.48
56.89
5,952,193.889
712,222.187
0.09
-38.24
5,673.70
0.33
149.71
5,672.39
5,619.39
-44.57
56.94
5,952,193.809
712,222.239
0.07
-38.26
5,690.50
0.35
147.35
5,689.19
5,636.79
-44.65
56.99
5,952,193.726
712,222.294
0.13
-38.28
5,707.30
0.33
146.27
5,705.99
5,652.99
-44.73
57.05
5,952,193.644
712,222.351
0.13
-38.31
10/192017 10:46:34AM
Page 15
COMPASS
5000.1 Build
81D
BP
by Final Survey Report BAj{I(U(ER
I asE-pany
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well 04-38
Project:
Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Site:
PB DS 04
MD Reference:
KB Q 53.00usft (04-38 ACTUAL)
Well:
04-38
North Reference:
True
Wellbore:
04-38A
Survey Calculation Method:
Minimum Curvature
Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Basting
DLeg
V. Sac
(usft)
V)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°AOOusft)
(usft)
5,724.10
0.35
148.55
5,722.79
5669.79
-04.82
57.\\1yy0��
5,952,193.562
712,222407
0.14
-38.33
5,741.00
0.38
153.02
5,739.69
5,686.69
-04.91
57.1
5,852,193.469
712,222.462
0.24
-38.34
5,757.80
0.43
151.40
5,756.49
5,703.49
-45.02
57.21
5,952,193.366
712,222.520
0.31
-38.36
5,774.60
0.47
150.94
5,773.28
5,720.28
-45.13
57.27
5,952,193.252
712,222.587
0.24
-38.38
5,791.50
0.53
153.05
5,790.18
5,737.18
-45.28
57.34
5,952,193.124
712,222.660
0.37
-38.40
5,808.30
0.58
152.38
5,806.98
5,753.98
.41
57.41
5,952,192.981
712,222.739
0.30
-38.42
5,825.15
0.58
154.90
5,823.83
5,770.83
-4
57.49
5,952,192.831
712,222.819
0.15
-38.44
5,842.00
0.55
155.62
5,840.68
5,787.68
-45.
57.56
5,952,192.682
712,222.892
0.18
-38.45
5,858.90
0.57
157.51
5,857.58
5,8
-45.86
57.63
5,952,192.532
712,222.962
0.16
-38.46
5,875.70
0.60
159.30
5,874.38
5,821.
-46.02
57.69
5,952,192.375
712,223.030
0.21
-38.47
5,882.50
0.63
157.85
5,891.18
5,838.18
-06.19
57.75
5,952,192.209
712,223.100
0.20
-38.47
5,909.20
0.63
157.32
5,907.88
54.88
46.36
57.82
5,952,192.041
712,223.175
0.03
-3848
5,926.00
0.62
157.38
5,924.6
5, 1.68
-46.53
57.88
5,952,191.874
712,223.251
0.06
-38.49
5,942.95
0.62
159.40
5,9
5,8 3
-46.70
57.96
5,952,191.705
712,223.323
0.13
-38.48
5,959.85
0.65
160.58
5,9 2
5,905.52
-48.88
58.03
5,952,191.531
712,223.392
0.19
-3849 -
5,976.80
0.72
160.48
5,975.
5,922.47
-07.07
58.09
5,952,191.342
712,223.465
0.41
-38.45
5,993.70
0.90
161.77
5,992.37
5,939.37
-47.29
58.17
5,952,191.118
712,223.548
1.07
-38.48
6,010.50
1.17
162.3
,009.17
5,956.17
-47.58
58.26
5,952,190.832
712,223.649
1.61
-38.48
6,027.20
1.37
162.10
6, 5.87
5,972.67
-47.83
58.38
5,952,190.483
712,223.772
1.20
-38.46
6,043.85
1.47
162.09
2.51
5,989.51
-48.33
58.50
5,952,190.094
712,223.910
0.60
-38.45
6,060.45
1.53
47
6,059.10
6,006.10
-46.74
58.64
5,952,189.686
712,224.058
0.37
-38.43
6,077.10
1.63
18
6,075.75
6,022.75
-49.17
58.79
5,852,189.256
712,224.221
0.63
-38.43
6,093.70
1.83
157
6,082.34
6,038.34
-49.64
58.97
5,952,188.795
712,224.415
1.31
-38.44
6,110.30
2.08
.91
6,108.93
6,055.93
-50.15
59.21
5,952,188.289
712,224.669
1.76
-38.49
6,126.85
2.27
148.44
6,125.57
6,072.57
-50.71
58.52
5,952,187.745
712,224.989
1.39
-38.58
6,143.55
2.38
14256
6,142.16
6,089.16
-51.28
59.87
5,952,187.181
712,225.358
0.81
-38.72
6,160.15
2.48
145.61
6,158.74
6,105.74
-51.87
60.26
5,952,186.605
712,225.762
0.78
-38.88
10119/2017 10:46.34AM Page 16 COMPASS 5000.1 Build 81D
BP (
�y by Final Survey Report BA.ry11U` R
aGl, m,,
Company:
Norm America - ALASKA - BP
Local Coordinate Reference:
Well 04-38
Project:
Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Site:
PB DS 04
MD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Well:
04-38
North Reference:
True
Wellbore:
04-38A
Survey Calculation Method:
Minimum Curvature
Design:
04-38A
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS E/W
Northing
Basting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft) (usft)
(usft)
(usft)
(°HOOusft)
(usft)
6,176.75
2.57
143.96
6,175.32
6,122.32
-52.46
60.88
5,952,186.020
712,226.200
0.70
-39.08
6,193.35
2.70
145.85
6,191.91
6,136.91
-53.09
61,7
5,952,185.408
712,226.656
0.94
-3927
6,209.95
2.92
146.57
6,20849
6,155.49
-53.77
8157
5,952,184.745
712,227.127
1.34
-39.47
8,228.55
3.10
144.44
6,225.08
6,172.06
-54.4
62.06
5,952,184.041
712,227.641
1.28
-39.69
6,243.10
3.18
143.71
6,241.59
6,188.59
-55.22
62.59
5,952,183.322
712,228.194
0.54
-39.93
6,259.65
3.30
143.46
6,258.11
6,205.11
.97
63.15
5,952,182.585
712,228.770
0.73
-40.20
6,276.15
3.50
145.63
6,274.58
6,221.56
7
63.72
5,952,181.805
712,229.359
1.44
-4046
6,292.60
3.87
145.81
6,291.00
6,238.00
-57.
64.31
5,952,180.948
712,229.979
2.25
-40.72
6,309.15
4.15
142.46
6,307.51
6,254.
-58.58
64.99
5,952,180.031
712,230.684
2.21
-41.04
6,325.75
4.25
140.69
6,324.06
6,271.
-59.53
65.75
5,952,179.100
712,231.466
0.99
-41.42
6,342.35
4.37
140.29
61340.62
6,287.62
-60.49
66.54
5,952,178.161
712,232.287
0.75
-41.84
8,358.95
4.58
740.89
8,357.17
304.17
-81.49
87.38
5,952,777.184
712,233.737
1.30
-4227
6,375.55
4.85
142.02
6,373.71
0.71
-62.56
68.21
5,952,176.141
712,234.016
1.72
-42.70
6,392.15
5.12
142.67
6,39
6, 25
-63.70
69.09
5,952,175.024
712,234.929
1.66
-43.14
6,408.80
5.23
142.00
6,4 3
6,353.83
-64.89
70.01
5,952,173.861
712,235.880
0.75
-43.60
6,425.45
5.32
141.07
6,423.
6,370.41
-66.09
70.96
5,952,172.690
712,236.865
0.75
-44.06
6,442.05
5.52
141.36
6,439.9
6,386.94
-67.31
71.95
5,952,171.496
712,237.882
1.22
-44.59
6,458.65
5.70
141.8
6,456.46
6,403.46
-68.58
72.95
5,952,170.253
712,238.924
1.13
-45.10
6,475.25
5.82
141.59
6,472.97
6,419.97
-69.89
73.99
5,952,168.975
712,239.992
0.75
-45.62
6,491.95
5.93
140.57
89.58
6,436.56
-71.22
75.06
5,952,167.676
712,241.103
0.91
-46.17
6,508.55
6.07
67
6,506.09
6,453.09
-72.55
76.17
5,952,166.376
712,242.253
1.02
-46.76
6,525.15
6.20
13 9
6,522.60
6,469.60
-73.90
77.32
5,952,165.059
712,243.441
0.79
-47.38
6,541.85
6.20
139
6,539.20
6,486.20
-75.28
78.49
5,952,163.718
712,244.648
0.16
-48.01
6,558.55
6.15
1 5
6,555.80
6,502.80
-76.65
79.65
5,952,162.381
712,245.847
0.30
-48.63
6,575.15
6.12
139.76
6,572.31
6,519.31
-78.00
80.80
5,952,161.060
712,247.030
0.18
-49.25
6,591.85
6.13
139.97
6,588.91
6,535.91
-79.37
81.95
5,952,159.730
712,248.217
0.15
-49.86
6,608.50
6.18
140.13
6,605.47
6,552.47
-80.73
83.09
5,952,158.395
712,249.401
0.32
-50.47
10/192017 10:46:34AM
Page 17
COMPASS
5000.1 Build SID
BP
by Final Survey Report BA.ryy1U`GHES
Company: North America - ALASKA - BP
Local Coordinate
Reference:
Well 04-38
Project: Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Site: PB DS 04
MD Reference:
KS @ 53.00usft (04-38 ACTUAL)
Well: 04-38
North Reference:
True
Wellbore: 04-38A
Survey Calculation
Method:
Minimum Curvature
Design: 04-38A
Database:
EDM R5K - Alaska
PROD - ANCP1
Survey
MD Inc.
Azi(azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(91OOusft)
6,625.20
6.22
140.07
6,622.07
6,569.07
-82.12
84,,`222555,,���
5,952,157.044
712,250.597
0.24
6,641.90
6.23
139.99
6,638.67
6,585.67
-83.51
85.4p
5,952,155.690
712,251.798
0.08
6,658.25
6.22
141.60
6,654.92
6,601.92
-84.88
86.53
5,952,154.349
712,252.957
1.07
6,674.50
6.23
141.73
6,671.08
8,818.08
-86.26
87.63
5,952,152.998
712,254.089
0.11
6,690.75
6.23
140.12
6,687.23
6,634.23
-87.63
88.74
5,952,151.661
712,255.238
1.08
6,707.15
8.32
140.14
6,703.53
6,650.53
.01
89.89
5,952,150.318
712,256.426
0.55
6,723.55
8.42
140.58
6,719.83
6,666.83
-
1
91.05
5,952,148.950
712,257.625
0.68
6,739.95
6.53
141.02
6,736.13
6,683.13
-91.
92.22
5,952,147.551
712,258.834
0.74
6,756.35
6.67
141.56
6,752.42
6,69
-93.31
93.39
5,952,146.114
712,260.054
0.93
6,764.95
6.77
141.96
6,760.96
6,707.
-94.10
94.02
5,952,145.341
712,260.899
1.28
8,766.85
6.62
142.05
61762.85
6,709.85
-94.28
94.14
5,952,145.188
712,260.827
3.01
6,785.70
6.95
143.00
6,781.56
728.56
-96.07
95.53
5,952,143.414
712,262.267
0.91
6,809.85
7.07
142.83
6,805.5
6, .53
-98.42
97.31
5,952,141.114
712,264.109
0.50
6,833.95
7.30
143.23
6,8
6,7 4
-100.83
99.12
5,952,138.757
712,265.989
0.98
6,858.55
7.62
145.60
6,8 3
6,800.83
-103.43
100.98
5,952,136.213
712,267.918
1.80
6,884.10
7.80
146.96
6,879.
6,826.15
-106.28
102.88
5,952,133.417
712,269.900
1.00
6,909.30
7.80
146.96
6,904.1
6,851.12
-109.15
104.74
5,952,130.604
712,271.845
0.00
6,934.55
8.03
147.8
,929.13
6,876.13
-112.08
106.62
5,952,127.728
712,273.799
1.04
6,959.75
8.48
148.60
6, 4.07
6,901.07
-115.15
108.52
5,952,124.707
712,275.789
1.83
6,984.95
8.75
149.23
78.98
6,925.98
-118.39
110.47
5,952,121.530
712,277.828
1.13
7,010.05
8.93
53
7,003.79
6,950.79
-121.71
112.43
5,952,118.268
712,279.885
0.74
7,035.15
9.38
14 7
7,028.57
6,975.57
-125.14
114.47
5,952,114.893
712,282.020
1.82
7,060.30
10.02
14
7,053.36
7,000.36
-128.77
116.66
5,952,111.328
712,284.311
2.55
7,085.55
10.52
.93
7,078.20
7,025.20
-132.62
118.99
5,952,107.544
712,286.748
1.99
7,110.85
10.93
148.98
7,103.06
7,050.06
-136.65
121.42
5,952,103.580
712,289.288
1.62
7,136.05
11.37
148.82
7,127.78
7,074.78
-140.83
123.94
5,952,099.480
712,291.922
1.75
7,163.55
11.92
148.74
7,154.72
7,101.72
-145.57
126.81
5,952,094.816
712,294.932
2.00
V. Sec
(usft)
-51.08
-51.70
-52.28
-52.84
-5341
-54.02
-54.64
-55.24
-55.85
-56.16
-56.23
-56.91
-57.78
-58.66
-59.51
-60.35
-61.10
-61.85
-62.59
-63.32
-64.03
-64.77
-65.59
-66.46
-67.36
-68.30
-69.38
10/19/2017 10:46:34AM Page 18 COMPASS 5000.1 Build 81D
BP
by Final Survey Report BAiUGHES
eE m
Company: North America -ALASKA -BP
Local Coordinate
Reference:
Well 04-36
Project: Prudhoe Bay
TVD Reference:
KB @ 53.00usft (0438
ACTUAL)
Site: PB DS 04
MD Reference:
KB @ 53.00usft (04-38
ACTUAL)
Well: 0438
North Reference:
True
Wellbore'. 04-38A
Survey Calculation
Method:
Minimum Curvature
Design: 04-38A
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi(azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. See
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
usft)-
(°/t00usft)
(usft)
7,191.55
12.55
148.80
7,182.08
7,129.08
-150.65
129.89
5,952,089.831
712,298.150
2.25
-70.53
7,219.55
13.17
146.87
7,209.38
7,156.38
-155.98
133.1
5,952,084.592
712,301.523
2.21
-71.74
1 7,247.45
13.73
149.08
7,236.51
7,183.51
-161.54
13848
5,952,079.127
712,305.023
2.01
-72.98
7,275.35
14.22
149.48
7,263.59
7,210.59
-167.3
139.90
5,952,073.435
712,308.627
1.79
-74.23
7,302.65
14.43
149.65
7,290.04
7,237.04
-173.16
143.32
5,952,067.710
712,312.211
0.78
-75.46
7,330.05
14.45
149.69
7,316.57
7,263.57
.06
146.77
5,952,061.912
712,315.826
0.08
-76.68
7,357.45
14.40
149.62
7,343.11
7,290.11
-1
5
150.22
5,952,056.122
712,319.439
0.19
-77.91
7,384.85
14.27
149.31
7,369.66
7,316.66
-190.
153.67
5,952,050.378
712,323.049
0.55
-79.15
7,412.20
14.10
148.96
7,396.17
7,343.
-196.54
157.11
5,952,044.725
712,326.647
0.70
-80.41
7,439.55
14.00
148.75
7,422.70
7,369.
-202.22
160.54
5,952,039.141
712,330.240
0.41
-81,69
7,466.95
13.95
148.57
7,449.29
7,396.29
-207.88
163.98
5,952,033.589
712,333.840
0.24
-83.00
7,494.35
13.88
148.52
7,475.89
422.89
-213.50
167.42
5,952,028.068
712,337.435
0.26
-84.30
7,521.75
13.82
148.63
7,502.49
9.49
-219.09
170.84
5,952,022.570
712,341.011
0.24
-85.60
7,549.10
13.73
148.63
7,52
7, 06
-224.65
174.23
5,952,017.107
712,344.556
0.33
-86.89
7,576.50
13.67
148.39
7, 68
7,502.68
-230.19
177.62
5,952,011.672
712,348.101
0.30
-88.18 _
7,603.90
13.68
148.10
7,582.
7,529.30
-235.70
181.03
5,952,006.262
712,351.663
0.25
-89.56
7,631.05
13.63
147.96
7,608.6
7,555.88
-241.13
184.42
5,952,000.923
712,355.209
0.22
-90.83
7,658.15
13.60
147.9
7,635.02
7,582.02
-246.54
187.81
5,951,995.615
712,358.746
0.12
-92.16
7,685.45
13.75
147.87
7,661.55
7,608.55
-252.01
191.24
5,951,990.247
712,362.330
0.55
-93.52
7,712.94
14.02
147.65
8.23
7,635.23
-257.59
194.76
5,951,984.769
712,366.005
1.00
-94.91
7,740.35
14.22
54
7,714.82
7,661.82
-263.23
188.34
5,951,979.227
712,369.746
0.74
-9635
7,767.85
14.32
14
4
7,741.47
7,688.47
-268.95
201.98
5,951,973.613
712,373.543
0.36
.97.81
7,795.30
14.33
147
7,768.06
7,715.06
-274.68
205.63
5,951,967.990
712,377.352
0.08
-99.28
7,822.65
14.27
1
4
7,794.57
7,741.57
-280.37
209.27
5,951,962.404
712,381.151
0.24
-100.76
7,850.15
14.15
47.08
7,821.22
7,768.22
-286.05
212.93
5,951,956.835
712,384.965
0.49
-102.25
7,877.55
13.95
146.75
7,847.80
7,794.80
-291.62
216.56
5,951,951.366
712,388.752
0.79
-10376
7,904.65
13.70
146.59
7,874.12
7,821.12
-297.03
220.12
5,951,946.058
712,392.461
0.93
-105.25
10/19201710:46.34AM
Page 19
COMPASS
5000.1 Build BID
BP
by Final Survey Report BAFUGHES
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 04-38
Project:
Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Site:
PB DS 04
MD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Well:
04-38
North Reference:
True
Wellbore:
04-38A
Survey Calculation Method:
Minimum Curvature
Design:
04-38A
Database:
EDM R5K - Alaska PROD - ANCP7
Survey
MD
Inc
An (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Eastin9
DLeg
V. Sec
(usft)
(°)
C)
lush)
(usft)
(usft)
(usft)
(waft)
(usft)
(°MOOusft)
(usft)
7,931.65
13,37
146.53
7,900.37
7,847.37
-302.30
2234D
5,951,940.886
712,396.090
1.22
-106.72
7,958.55
13.07
146.45
7,926.56
7,873.56
-307.43
10226.9
5,951,935.855
712,399.629
1.12
-108.16
7,985.45
12.77
146.45
7,952.78
7,899.78
-312.44
230.32
5,951,930.938
712,403.093
1.12
-109.57
8,012.35
12.55
146.48
7,979.02
7,926.02
-317.36
233.57
5,951,926.116
712,406.487
0.82
-110.95
6,039.25
12.37
146.45
8,005.29
7,952.29
236.78
5,951,921.372
712,409.828
0.67
-112.30
8,066.20
12.22
146.39
8,031.62
7,978.62
239.95
5,951,916.683
712,413.136
0.56
-113.65
8,093.15
12.05
146.50
8,057.97
8,004.97
\-3
243.09
5,951,912.052
712,418.399
0.64
-114.96
8,119.65
11.88
146.69
8,083.89
8,030.89
246.11
5,951,907.553
712,419.552
0.68
-116.25
8,139.35
11.78
146.72
8,103.17
8,05
-339.66
248.33
5,951,904.241
712,421.863
0.51
-117.18
8,156.65
11.70
146.70
8,120.11
8,067,
342.60
250.26
5,951,901.355
712,423.877
0.46
-117.99
8,173.95
11.58
146.64
8,137.06
-345.52
252.18
5,951,898.494
712,425.876
0.70
-118.80
8,183.20
11.62
146.59
8,146.12
2
-347.07
253.20
5,951,896.970
712,426.943
0.45
-119.23
8,183.95
11.60
146.59
8,146.85
\UUU406
5
-347.20
253.28
5,951,896.847
712,427.030
2.67
-119.26
8,188.35
11.60
148.57
8,1
6
-347.94
253.77
5,951,896.122
712,427.538
0.09
-119.47
8,193.95
11.57
146.60
8,1 5
8,103.65
-348.88
254.39
5,951,895.202
712,428.183
0.55
-119.73
8,199.85
11.53
146.65
8,162.
8,109.43
-349.86
255.04
5,951,894.234
712,428.860
0.70
-120.00
8,205.79
11.55
146.65
8,168.2
8,115.25
-350.86
255.69
5,951,893.260
712,429.541
0.34
-120.27
8,211.79
11.65
146.6
,174.13
8,121.13
-351.86
256.36
5,951,892.272
712,430.233
1.88
-120.55
8,217.80
11.67
146.55
8, 0.01
8,127.01
-352.88
257.03
5,951,891.277
712,430.931
0.37
-120.84
8,223.80
11.57
146.59
85.89
8,132.89
-353.88
257.69
5,951,890.268
712,431.625
1.67
-121.12
8,229.85
11.37
.83
8,191.82
6,138.82
-354.89
258.35
5,951,889.301
712,432.313
3.40
-121.39
8,235.85
11.22
14 5
8,197.70
8,144.70
-355.88
258.99
5,951,888.333
712,432.979
3.02
-121.66
8,241.95
11.17
147
8,203.69
8,150.69
-356.88
259.63
5,951,887.352
712,433.642
1.60
-121.91
8,247.75
11.17
.87
8,209.38
8,156.38
-357.83
260.23
5,951,886.418
712,434.267
0.30
-122.15
8,257.30
10.97
147.72
8,218.75
8,165.75
-359.38
251.20
5,951,884.895
712,435.288
2.12
-122.54
8,262.00
11.18
146.76
8,223.36
8,170.36
-360.14
261.69
5,951,884.150
712,435.797
5.95
-122.73
- 8,267.55
11.13
146.86
8,228.81
8,175.81
-W6
04
262.28
5,951,883.268
712,436.410
0.97
-122.98
107192017 10:46..34AM
Page 20
COMPASS
5000.1 Build 81D
BP
by Final Survey Report BA, I1�(U R
1 aGE..,,
Company:
North America- ALASKA - BP
Local Coordinate Reference:
Well 04-38
Project:
Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
site:
PB DS 04
MD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Well:
04-38
North Reference:
True
Wellbore:
04-38A
Survey Calculation Method:
Minimum Curvature
Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1
Survey _
'�. MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Emoting
DLeg
V. Sec
(usft)
(°)
N
(usft)
lush)
(usft)
(usft)
(usft)
(usft)
(*1100usft)
(usft)
8,273.04
11.10
146.99
8,234.19
8,181.19
-361.92
262,06
5,951,882.398
712,437.012
0.71
-123.22
81278.75
11.08
147.17
8,239.80
8,186.80
-362.85
263.4
5,951,881.493
712,437.635
0.70
-123.46
8,284.50
11.10
147.36
8,245.44
8,192.44
-363.78
264.05
5,951,880.580
712,438.259
0.72
-123.71
8,290.15
11.08
147.27
8,250.98
8,197.98
-364.69
264.64
5,951,879.683
712,438.872
0.47
-123.95
8,295.90
11.02
147.14
8,256.63
8,203.63
265.24
5,951,878.773
712,439.494
1.13
-124.19
8,301.80
10.97
147.27
8,262.42
8,209.42
265.84
5,951,877.845
712,440.130
0.95
-12444
8,308.70
10.95
147.32
8,269.19
8,216.19
\-36
266.55
5,951,876.762
712,440.870
0.32
-12473
8,312.15
10.80
147.34
8,272.58
8,219.58
266.91
5,951,876.221
712,441.238
1.45
-124.87
8,325.29
10.68
147.58
8,285.49
8,23
-370.29
268.23
5,951,874.186
712,442.619
1.71
-125.41
8,339.70
10.50
147.90
8,299.65
8,246.
372.53
269.64
5,951,871.987
712,444,095
1.31
-125.97
8,354.10
10.37
148.15
8,313.81
8,260.81
-374.74
271.02
5,951,869.815
712,445.538
0.96
-126.51
8,368.50
10.28
148.29
8,327.98
74.98
-376.94
272.38
5,951,887.880
712,448.959
0.65
-127.04
8,382.90
10.23
148.29
8,342.1
8, .15
-379.12
273.73
5,951,865.518
712,448.367
0.35
-127.56
8,397.30
10.20
148.25
8,3
8,3 2
-381.29
275.07
5,951,863.385
712,449.771
0.21
-128.08
8,411.75
10.15
148.37
8,3
8,317.54
-383.46
276.42
5,951,861.252
712,451.172
0.38
-128.59
8,426.20
10.12
148.59
8,384.
6,331.77
-385.63
277.74
5,951,859.123
712,452.562
0.34
-129.10
8,440.60
10.05
148.82
8,398.95
8,345.95
-387.78
279.05
5,951,657.006
712,453.932
0.56
-129.60
8,455.10
9.98
149.0
,413.23
8,360.23
-389.94
280.36
5,951,854.884
712,455.294
0.53
-130.08
8,469.50
9.93
149.16
8, 7.41
8,374.41
-392.08
281.64
5,951,852.785
712,456.633
0.39
-130.55
8,485.40
9.85
149.31
43.07
8,390.07
-394.43
283.03
5,951,850.479
712,458.096
0.53
-131.06
8,502.70
9.73015
8,460.12
8,407.12
-396.96
284.52
5,951,847.985
712,459.656
0.88
-131.59
8,519.85
9.70
8,477.03
8,424.03
-399.47
285.96
5,951,845.518
712,461.168
0.54
-132.09
8,531.00
9.70
8,488.02
8,435.02
-401.11
286.89
5,951,843.909
712,462.137
0.48
-132.40
7 818"
8,537.00
9.70
V150.87
8,493.93
8,440.93
-401.99
287.38
5,951,843.041
712,462.655
0.48
-132.56
8,554.10
9.77
151.68
8,510.78
8,457.78
-404.53
288.77
5,951,840.546
712,464.116
0.90
-133.00
8,571.30
9.90
152.27
8,527.73
8,474.73
407.12
290.15
5,951,837.992
712,465.569
0.96
-133.41
10/192017 10:46:34AM
Page 21
COMPASS 5000.1 Build 81D
BP
by BAT
Final Survey Report GHES
GE-,,,,
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 04
Well:
04-38
Wellbore:
04-38A
Design:
04-38A
Survey
NIS
MD Inc
E/Vd
(usft) V)
Northing
8,588.50
10.03
8,605.70
10.10
TIP
(waft)
8,623.00
10.13
KOP-INS
291.53
8,642.17
14.83
Interpolated Azimuth
-412.42
8,670.39
24.73
Interpolated Azimuth
8,700.31
Interpolated Azimuth
8,730.15
8,763.90
8,790.35
8,820.19
8,850.10
8,880.10
8,910.12
8,940.29
8,970.11
9,000.53
9,030.36
9,060.41
9,090.31
9,120.39
9,150.41
9,180.40
9,210.53
Azi(azimuth) TvD
V) (usft)
15246 8,544.67
152.46 8,561.61
152.51 8,578.64
137.69 8,597.35
127.75 8,623.88
32.37 122.54 8,650.15
39.62 119.42 81674.28
48.04 109.04 8,698.64
52.64 107.94 8,715.51
55.54 119.67 8,733
59.63 132.48 8,7 3
63.62 144.06 8,763.
69.06 152.40 8,775.4
79.48 144.4 8,783.66
85.54 137.34 8,787.55
85.88 135.21 89.83
86.25 .12 8,791.88
87.76 15 6 8,793.46
88.16 187 8,794.52
88.59 7 1 8,795.38
88.10 189.17 8,796.25
89.54 199.03 8,796.87
89.20 207.07 8,797.20
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
TVDSS
NIS
V. Sec
E/Vd
(usft)
Northing
(waft)
(usft)
712,467.023
(usft)
-133.80
(waft)
8,49167
-409.76
-134.20
291.53
712,469.966
5,951,835.396
8,508.61
-412.42
712,472.490
292.911
5,951,832.771
8,525.64
-415.12,
-140.28
` 294.32
712,491.727
5,951,830.117
8,544.35
L8.43
712,659.357
`296.76
31.04
5,951,826.874
8,570.88 ,
-42%
303.87
-266.68
5,951,820.776
36.51
-276.52
712,715.488
8,597\-432.88
-281.01
712,725.538
315.59
35.25
5,951,812.957
8,621.28`
-441.87
35.29
330.64
712,729.313
5,951,804.402
645.84
-451.28
712,722.839
351.94
33.22
5,951,795.598
2.51
-457.72
26.71
371.25
5,951,789.696
8, 05
-467.49
393.27
5,951,780.554
8,696.13
-482.36
413.57
5,951,766.265
8,710.42
-502.04
431.06
5,951,747.087
8,722.48
-525.40
445.48
5,951,724.142
8,730.66
-550.05
460.70
5,951,699.932
8,734.55
-572.95
479.35
5,951,677.567
8,736.83
-594.87
500.31
5,951,656.247
8,738.88
-617.86
519.15
5,951,633.806
8,740.46
-644.16
533.50
5,951,607.914
8,741.52
-672.53
542.75
5,951,579.821
8,742.38
-702.30
546.67
5,951,550.176
8,743.25
-732.20
544.84
5,951,520.235
8,743.87
-761.24
537.55
5,951,490.999
8,744.20
-788.95
525.76
5,951,462.979
Well 04-38
KB @ 53.00usft (04-38 ACTUAL)
KB @ 53.00usft (04-38 ACTUAL)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Easting
DLeg
V. Sec
-159.57
(usft)
(Woueft)
(usft)
-176.37
712,467.023
0.78
-133.80
-192.31
712,468.487
0.41
-134.20
-209.66
712,469.966
0.18
-134.60
-223.65 -
712,472.490
29.48
-135.75
-233.35
712,479.782
36.93
-140.28
-238.91
712,491.727
26.83
-146.51
-244.79
712,659.357
712,507.016
25.05
-159.57
712,528.573
32.74
-176.37
712,548.054
17.68
-192.31
712,570.346
33.26
-209.66
712,591.055
38.62
-223.65 -
712,609.087
36.45
-233.35
712,624.159
31.22
-238.91
712,640.073
42.92
-244.79
712,659.357
31.04
-254.48
712,680.932
7.07
-266.68
712,700.405
36.51
-276.52
712,715.488
35.38
-281.01
712,725.538
35.25
-280.00
712,730.292
35.29
-273.50
712,729.313
37.86
-261.56
712,722.839
33.22
-244.77
712,711.838
26.71
-224.22
10/192017 10:46:34AM Page 22 COMPASS 5000.1 Build 81D
by BP
Final Survey Report BA UGHES
a GEmMpany
Company: North America - ALASKA - BP
Local Coordinate
Reference:
Well 04-38
Project: Prudhoe Bay
TVD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Site: PB DS 04
MD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Well: 04-38
North Reference:
True
Wellbore: 04-38A
Survey Calculation
Method:
Minimum Curvature
Design: 04-38A
Database:
EDM R5K - Alaska
PROD - ANCP1
Survey
MD Inc
AN (azimuth)
TVD
TVDSS
NIS
EM/
Northing
Easting
DLeg
V. Sec
(usft) (1)
(1
(ase)
(usft)
(usft)
(usft)
(usft)
(usft)
(.1100usft)
(usft)-
9,240.03
88.31
218.31
8,797.84
8,744.84
-813.73
509.86
5,951,437.760
712,696.641
38.21
-200.80
9,269.43
90.89
227.01
8,798.05
8,745.05
-835.32
4899
5,951,415.612
712,677.357
30.86
-174.71
9,299.74
89.57
228.44
8,797.93
8,744.93
-855.71
467.3
5,951,394.601
712,655.516
6.42
-146.66
9,330.04
89.75
227.98
8,798.11
8,745.11
-875.90\401,67
444.94
5,951,373.781
712,633.504
1.63
-118.53
9,380.16
91.35
225.89
8,797.82
8,744.82
96.47422.94
5,951,352.606
712,612.092
8.74
-90.82
9,390.18
93.16
224.44
8,796.64
8,743.64
- .62
5,951,330.868
712,591.427
7.72
-63.60
9,421A9
92.27
222.98
8,795.17
8,742.17
- 1
380.26
5,951,307.885
712,570.664
5.51
-35.83
9,449.95
91.26
224.53
8,794.28
6,741.28
-960.
360.38
5,951,286.571
712,551.379
6.43
-10.05
9,480.91
90.68
226.73
8,793.76
8,74
-982A1
338.26
5,951,264.311
712,529.872
7.35
18.15
9,510.68
89.82
228.28
8,793.63
8,740.
002.52
316.31
5,951,243.592
712,508.500
5.95
45.65
9,540.17
88.06
230.48
8,794.17
8,741.17
-1,021.72
293.93
5,951,223.776
712,486.673
9.55
73.24
9,570.90
86.93
230.87
8,795.52
742.52
-1,041.17
270.18
5,951,203.660
712,463.483
3.89
102.21
9,604.17
86.25
233.33
6,796.9
8, .92
-1,061.59
243.95
5,951,182.513
712,437.844
8.39
133.84
9,630.65
90.52
234.41
817
8,7 0
-1,077.20
222.57
5,951,166.306
712,416.909
9.49
159.28
9,660.36
91.63
236.98
8,7
8,743.64
-1,093.94
198.03
5,951,148.882
712,392.856
9.42
188.06
9,690.47
92.89
238.36
8,795.
8,742.45
-1,110.03
172.61
5,951,132.082
712,367.900
6.20
217.45
9,720.43
94.39
240.00
8,793.5
8,740.55
-1,125.35
146.94
5,951,116.047
712,342.668
7.41
246.81
9,750.43
95.87
241.9
,790.87
8,737.87
-1,139.85
120.81
5,951,100.818
712,316.965
8.11
276.32
9,779.67
98.50
246.59
8,7 7.21
8,734.21
-1,152.44
94.69
5,951,087.492
712,291.210
18.16
305.18
9,810.27
99.94
248.07
82.31
8,729.31
-1,164.08
66.82
5,951,075.070
712,263.681
6.70
335.35
9,840.35
101.75
.82
8,776.65
8,723.65
-1,174.70
39.26
5,951,063.684
712,236.425
8.30
364.88
9,870.70
103.48
25 8
8,770.02
8,717.02
-1,184.34
11.26
5,951,053.255
712,208.710
9.49
394.49
9,902.07
103.57
25
8,762.68
8,709.68
-1,192.84
-18.03
5,951,043.938
712,179.674
10.20
424.92
9,930.95
103.49
.11
8,755.92
8,702.92
-1,199.25
-45.36
5,951,036.755
712,152.534
8.89
452.80
9,960.37
103.83
261.73
8,748.97
8,695.97
-1,204.25
-73.51
5,951,030.960
712,124.547
12.01
480.95
9,990.98
103.88
264.90
8,741.64
8,688.64
-1,207.71
-103.02
5,951,026.671
712,095.144
10.06
509.87
10,020.51
104.79
264.54
8,734.33
8,681.33
-1,210.35
-131.51
5,951,023.236
712,066.742
3.30
537.54
10/19/2017 10.46:34AM Page 23 COMPASS 5000.1 Build 81D
•,S
BP
-,, by
Final Survey Report
BA{{�(U R
aGE�w,
Company: North America
- ALASKA -BP
Local Coordinate Reference:
Well 04-38
Project: Prudhoe Bay
TVD Reference:
KB C 53.00usft (04-38 ACTUAL)
Site: PB DS 04
MD Reference:
KB @ 53.00usft (04-38 ACTUAL)
Well: 04-38
North Reference:
True
Wellbore: 04-38A
Survey Calculation Method:
Minimum Curvature
Design: 04-38A
Database:
EDM R5K - Alaska PROD - ANCP7
Survey
....Y
MD Inc
Azi (azimuth)
TVD
TVDSS NIS
EAN Northing
Easting DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft) (usft)
(usft)usft
( )
(usft) (°1100usk)
(usft)
10,043.41
105.13
263.80
8728.42
8,675.42 -1,212.59
53-R 5,951 020 370
712,044.806 3.46
558.99
10,069.00
105.13
263.80
8,721.74
8,668.74 -1,215.26
® -178. 5,951,017.010
712,020.334 0.00
582.98
Projection to TD - 2 318"
`
10,069.00
8,721.74
2 3/8"
3.000
Design Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/-S
+E/-W
(usft)
lush)
(usft)
lush)
Comment
8,605.70
8,561.61
-412.42
292.92
TIP
8,623.00
8,578.64
-415.12
294.32
P WS
8,892.17
8,597.35
-418.43
298.76
,
polated th
8,670.39
8,623.88
-424.73
3 .87
In fated Azimuth
8,700.31
8,650.15
-432.88
59
Inter ted Azimuth
10,069.00
8,72174 _
-1,215.26
_ -178.008
Prciectillin to TD
Prepared By: Yosha
Baker Hughes a GE
101192017 10 4634A Page 24 COMPASS 5000.1 Build 81D
ProjW: Prudhoe Bay
Site: P80304
1- WWI: 0433
0p WWlbara: 0438A
N oasign:0433A(04,wo4 A)
eYYYWI
m..�nivm�
Mm
WELLBORE DETAILS: M -38A
BBBBENCEfNIGYMIx
0 WA
Gaam(wt7mi.eu. wxia �e inexMn
yW �mNxaeeme x3®SI NuN,W.Y FCiMel,
fm
say fysl eioim. su-,o aox.o a[I
TO m M0: 8605.)8
Mes�ee 09U P.r/a x. w Paxmk)
04-41/04-41AP81
CioJi'nn AWbf'. MnmaneuMue
W
N N tl
q
c
J
5951470
O
5951400
O O O
O
O
O
O
5952380
5951120
-
-.
- -
.. ..-•
5952310
-
5952240,
5952170
5952100
5952030
5951930
04-38AACTUAL
5951890
5951820
C
595,750'.
u,
G595, 680
005951610
e
Sss154o
0
Z 5951470
595,400
5951330
5951260
5951190
5951120
59510.50
/04-38/N-3�8A;
595m
04-47/0447
599910
Tom—
-
O N
N
W
VO
O O O
O
O O
O
O O O
O
r0
O
O
O
KB@53.00Ms3(04-38ACTUAL)
eYYYWI
m..�nivm�
Mm
WELLBORE DETAILS: M -38A
BBBBENCEfNIGYMIx
0 WA
Gaam(wt7mi.eu. wxia �e inexMn
yW �mNxaeeme x3®SI NuN,W.Y FCiMel,
Parent Woure: 0438
say fysl eioim. su-,o aox.o a[I
TO m M0: 8605.)8
Mes�ee 09U P.r/a x. w Paxmk)
04-41/04-41AP81
CioJi'nn AWbf'. MnmaneuMue
W
Post Drilling
EBsting (70 usftlin)
J V J NJ
WtW4.1� O O O O O O O O O
O /
O
�O
04-38/0438
04-07/04-07PB1
EBsting(70 usiUin)
J V
N
O O O O O O
J
BA ER
F�UGHES
GEt.,,
N fJ N O N N fJ O
W fNu e J A N U fmii
O O O O D O
5952310
04-08/04-08
i 5%2240
5952170
5952400
.595254
O :5951960
04-41/04-41A'-,"
15951820
04-01/04-41042
Z
1, 59517W
04-41/04.41,'
04-41 ro4.41A
: 5951680m
04-41/04-41AP81
5951610=
c
5951540
5951470
5951400
5951330
595126D
5951190
5951120
\09/04-09
5961050
5950980
04-09/04-09PBI -\
North America - ALASKA - BP
Prudhoe Bay
PB DS 04
04-38
04-38A
04-38A
Anticollision Summary Report
19 October. 2017
BA < E FZ
1-'UGHES AW
a GE company
10
zl-�OGCC
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 04
Site Error:
0 oousft
Reference Well:
04-38
Well Error:
0.0ousft
Reference Wellbore
04-38A
Reference Design:
04-38A
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
BA EH
hlUGHES
Well 04-38
KB @ 53.00usft (04-38 ACTUAL)
KB @ 53.00usft (04-38 ACTUAL)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
04-38A
Filter type:
NO GLOBAL FILTER: Using user defined selection 8 filtering criteria
WARNING: There is hidden tightdate in this project
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 500.00usft Error Surface:
Elliptical Conic
Survey Program Date 10/19/2017
From To
(usft) (usft) Survey (Wellbore) Tool Nam
80.20 8,605.70 1 . Schlumberger GCT multishot (04-38) GCT -MS
8,623.00 10,043.41 BHGE CTK MWD 3" (04-38A) MWD
Description
Schlumberger GCT multishot
MWD- Standard
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
PB DS 04
04-07 - 04-07 - 0407
3,512.29
3,500.00
287.60
83.31
224.34
Pass - Major Risk
04-07 - 04-07PB1 - 04-07PBI
3,512.29
3,500.00
287.60
63.31
224.34
Pass -Major Risk
04-08 - 04-08 - 04-08
3,378.84
3,375.00
154.50
55.22
99.33
Pass - Major Risk
04-09-0409-D4-09
3,077.76
3,075.00
69.16
53.19
16.03
Pass - Major Risk
04-09 - 04-09PB1 - 04-09PB1
3,077.76
3,075.00
69.16
53.34
15.88
Pass - Major Risk
04-10-04-10-04-10
2,649.13
2,650.00
76.94
1,103.98
-1,026.49
FAIL - Major Risk
0438 - 04-38 - 04-38
8,908.97
9,050.00
250.09
14.74
235.73
Pass - Major Risk
04-41 - 04-41 - 0441
3,451.69
3,450.00
230.55
54.31
176.24
Pass - Major Risk
04 -41 -04 -41A -04-41A
3,451.69
3,450.00
230.55
53.85
176.71
Pass -Major Risk
04-41 - 04-41A - Plan #5
3,451.69
3,450.00
230.55
54.31
176.24
Pass -Major Risk
0441-04-41APB1-04-41APB1
3,451.69
3,450.00
230.55
54.31
176.24
Pass -Major Risk
0441-0441APB2-0441APB2
3,451.69
3,450.00
230.55
54.31
176.24
Pass -Major Risk
0447 - 0447 - 04-47
3,435.14
3,675.00
456.98
78.25
378.72
Pass - Major Risk
10/192AOGCC
017 11:00:33AM COMPASS 5000.1 Build BID
_m
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 04
Site Error:
O.00usft
Reference Well:
04-38
Well Error:
O.00usft
Reference Wellbore
04-38A
Reference Design:
04-38A
BP
Anticollision Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
Norm Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
BA ER
1 UGHES QW
Well 04-38
KB @ 53.00usfl (04-38 ACTUAL)
KB @ 53.00usft (04-38 ACTUAL)
True
Minimum Curvature
1.00 sigma
EDM R5K-Alaska PROD -ANCP1
Offset Datum
Reference Depths are relative to KB @ 53.00usft (04-38 ACTUAL) Coordinates are relative to: 04-38
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK
Central Meridian is 150° 0' 0.000 W ° Grid Convergence at Surface is: 1.82°
10119/2017 11:00:A0GCC
33AM COMPASS 5000.1 Build 81D
Printed 11/8/2017 10:53:50AM
North America - ALASKA - BP
Page 1 of 2
Cementing Report
Comrtan Well Name: 04-38 / 01
Project: Prudhoe Bay — --_
_
— —_.
Sae' PB DS O4
Report no.: 1 Reporttlate: 10/18/2017
— _ _ - --
Spud
Event Type: COM- ONSHORE (CON)
_ _ _
Start Date: 10/15/2017
_ DateTme: 8/21/1991
-
Contractor: NABORS ALASKA DRILLING INC. —
-
End Date: 10/22/2017
Rig Name/No.: CDR-2 RigRelease'
L
ATE No
X3-018JR-C: (1,134,044.00 )
BPUOI: USA00001143
--
t Active datum: KB (d 53.00usft (above Mean Sea Level)
-- —.--
General Information
Job type: Primary
Cement job start date/time: 10/18/2017 10:30AM
Job end datettime: 10/18/2017 12:30PM
Cement Company: SCHLUMBERGER
Cementer:
Cemented String: PRODUCTION LINER 1
String Size: 2.375 (in)
String Set TMD: 10,028.00 (usft) Hole Size: 3.250 (in)
Pipe Movement
Pipe Movement: NO MOVEMENT
Rotating Time (Start-End):
RPM:
Rotating Torque (initfavg/max): (ft-Ibf)
Reciprocating Time (Start-End):
Recip Drag Up/Down: - (kip)
SPM: Stroke Length:
Fluid Name: CEMENT
Piultle (7 of 1)
Slurry Type. CEMENT
Purpose: PRIMARY
Class:
G-CLASS Description:
LEAD SLURRY Density: 15.30 (ppg)
Yield 1.3100 (fP/sk)
Mix Water Ratio:
6.092 (gagsk94) Excess:
Mix Method: BATCH
Sacks Used: 70.50 (941b sacks)
Water Volume:
10.2 (bbl) Excess Slurry Volume:
0.0 (bbl) Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well:
8.5 (bbl) Slurry Volume:
16.4 (bbl) Excess Measured From: EST. GAUGE HOLE
Mud Type:
Density:
8.48 (ppg) PV: 0.00 (cp)
YP: 0.000 (Ibf/100ft-) Viscosity. 26.00 (Nqt)
Gels 10 Sec: 0.000 (Ibf/100ft-)
Gels 10 Min:
0.000 (Ibf/100ft-)
Additives
Name
Type
Amount
Units
Concentration Unit
D047
ANTIFOAMAGENT
0.100 GAUSX
D206
ANTIFOAMAGENT
0.100 GAUSX
D065
DISPERSANT
1.000 %BWOC
D167
FLUID LOSS
0.100 % BWOC
D600G
GASBLOK
1.500 GAUSX
D163
CEMENT
5.000 %eWOC
BWO
Fluid Teets
Thick time
(hr)
Thick
temp.
Free waster
Free water
Fluid loss
Fluid loss
Fluid loss
Comp
Comp
Comp
Comp
Comp Strength
Comp Strength
(°F)
(%)
temp.
(cc/30min)
temp.
press.
Strength
Strength
Strength
Strength Time
Pressure 2
Temperature 2
(`F)
("F)
(psi)
Time 1
Pressure 1
Temperature 1
2
(psi)
(°F)
min
psi
°F
min
5.77
90.00
0.001
80.00
50.0
167.00
1,000.00
Printed 11/8/2017 10:53:50AM
Printed 11/8/2017 10:53:50AM
North America - ALASKA - BP
Page 2 of 2
Cementing Report
Common Well Name: 04-38 / 01
Repan no.: 1 Repon date: 1011B12017
Prolrxt: Prudhoe Bay—
SRe PB OS 04
� _.
I, Spud Date/Time: 8!21/1991
_ _
Even! Type: COM- ONSHORE (CON)
I StartDete'. 10/15/2017 End Date: 10/2212017
AFE No.:
Contractor: NABORSALASKA DRILLING
INC.
Rig Name/No.. CDR -2 i Rig Release'.
X3 -018J11 -Q. (1,134,044.00)
BPUOI: USA00001143
Active datum: KB ®53.00usft (above Mean Sea Level)
Sligoo
Stage
Stage Type
Est. Top
Est. Bottom
Mud Circ.
Mud Circ.Top
Bottom
Plug
Pressure
F1081
Pressure
Rewme
Circulate
Cmt Vol to
Total
Annular
no.
(usft)
(usft)
Rate
Press.
Plug
Plug
Bumped
Bumped
I
tiara
Hem
Prior
Surface
Mud Lost
Flow
(gpm)
(psi)
(hr)
(bbl)
(bbl)
After
(psi)
(min)
I
RIMARV CEMENT
8,531.00
10,026.00
Y
Y
y
Pumping Schedule
Fluid pumped Volume
Avg.
Max Disp.
Slurry Top
Slurry Base
Start Mix Cmt
Start Slurry
Pumping end
Start Disp
Foam
Gas Type
Gas Vol
BH circ.
Bh static
Pumped
Disp.
Rate
TMD
TMD
Pmp
date/time
job
Used
temp.
temp.
(bbl)Rate
(bbUmin)
(usft)
(usft)
(scr)
bbUmin
Toots
Casing Test
Shoe Test
Liner Top Test
Teat Pressure: (psi)
FIT/LOT:
(ppg)
Liner Overlap:
(usft)
Time: (min)
Tool:
N
Positive Test:
(ppg)
Positive Test Tool:
N
Cement Found between Shoe and Collar.
N
Open Hole Length:
(usft)
Negative Test:
(ppg)
Negative Test Tool:
N
Hours Before Start: (hr)
Time before test:
(hr)
Cmt Found on Tool:
N
Log/Survey Evaluation
Interpretatlon Summary
CBL Run: N
Cement Top:
8,531.00 (usft)
Under Pressure: (psi)
How Determined:
TOP OF LINER
Bond Quality:
TOC Sufficient:
Y
CET Run: N
Job Rating:
Bond Quality:
If Unsuccessful, Detection Indicator
Temp Survey: N
Remedial Cement Required:
N
Him Prior to Log: (hr)
How Determined:
Printed 11/8/2017 10:53:50AM
BAN(ER PRINT DISTRIBUTION LIST
HES
a GE company
COMPANY BP Exploration Alaska In 13 E I v E
WELL NAME 04-38A
FIELD Prudhoe Bay Unit NOV 0 1 20177
21 7098
28 760
Please sign and return one copy of this transmittal form to:
Exploration (Alaska) Inc.
rotechnical Data Center, LR2-1 DATA LOGGED
11 / q,/2011
900 E. Benson Blvd. „I K. BENDER
Anchorage, Alaska 99505
to acknowled a receipt of this data.
COUNTY PRUDHOE BAY AOGCC LOG TYPE GR - RES
BHI DISTRICT
Alaska
AUTHORIZED BY Patrick Rider
EMAIL Patrick.Ridec@Lakerhuqhes.com
STATUS Final Replacement:
COMPANY
ADDRESS (FERE% WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
V
f BP North Slope.
EOA, PBOC, PRB-20 (Office 109)
D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill
900 E. Reason Blvd.
Anchorage. Alaska 99508
2 ConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99510
3 ExxonMObil,AkaSla
Attn: Lynda M. Vaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska -AOGCC
Ann: Makana Bender
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR - Division ofOil & Gas ...
Ann: Resource Evaluation
550 West 7th Avenue, Suite 1100
I,+Anchorage, Alaska 99501
L` Stamp "confidential" on all material deliver to DNR
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd
Anchorage, Alaska 99508
Attn: Rana Elghonimy
v_
LOG DATE October 15, 2017
TODAYS DATE October 30, 2017
Revision
Details:
Rev. Requested by: ---
FIELD/ FINALCD/DVD
FINAL
PRELIM
LOGS
(las, dlis, PDF, META,
SURVEY
I
REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRIN OF PRIN
# OF COPIES
J#OFCOPIES
# OF COPIES
0 0 1 D 0
0 1 1 1 1 11 0
D 1 0 1 1 1 1 1 0
0 0 0 0 0
TOTALS FOR THIS PAGE: 0 2 4 4 0
THE STATE
°fALASKA
GOVERNOR BILL WALKER
Uchenna Egbejimba
Engineering Team Leader
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax 907.276.7542
www.00gcc.alaska.gov
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 04-38A
BP Exploration (Alaska), Inc.
Permit to Drill Number: 217-098
Surface Location: 383' FSL, 655' FEL, SEC. 27, TI 1N, RI 5E, UM
Bottomhole Location: 851' FNL, 896' FEL, SEC. 34, TI IN, RI 5E, UM
Dear Mr. Egbejimba:
Enclosed is the approved application for permit to re -drill the above referenced development well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
4`
DATED this
day of July, 2017.
Sincerely,
Hollis S. French
Chair
STATE OF ALASKA
^' ASKA OIL AND GAS CONSERVATION COMMISSION!
PERMITTO DRILL f
20 AAC 25.00S
n' GVGGIYGLip
JUN 2 3 2017
1a. Type ofWork:
1b. Proposed Well Class: Exploratory -Gas ❑ Service - WAG ❑ Service - Disp❑
1c. Specify Ili Grt f .
Drill El Lateral ❑
Stratigraphy_ Test ❑ Development -Oil 0' Service-Winj ❑ Single Zone 0
7"�
Coalbed Gas ❑ Gas Hydrates [I
Redrill 0' Reentry ❑
Exploratory -Oil ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket 0 • Single Well ❑
11. Well Name and Number.
BP Exploration (Alaska), Inc
Bond No. 295105380 •
PBU 04-38A
3 Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 196612 Anchorage, AK 99519-6612
MD: 10172" TVD: 8654ss ,
PRUDHOE BAY, PRUDHOE
OIL
`a. Location of Well (Governmental Section):
7. Property Designation (Lease Number):
ADL 028325 '
Surface: 383' FSL. 655' FEL, Sec. 27, T1 IN. RISE, UM
8. DNR Approval Number:
13. Approximate spud date:
Top of Productive Horizon: 23' FNL, 366' FEL, Sec. 34, TI N. R1 5E, UM
70-039
September 1, 2017
Total Depth: 851' FNL, 896' FEL, Sec. 34, T1 IN, R15E, UM
9. Acres in Property: 2560
14. Distance to Nearest Property:
46970
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL: 53 feet
15. Distance to Nearest Well Open
Surface: x- 712164 • y- 5952237 • Zone - ASP 4
GL Elevation above MSL: 18.6 feet
to Same Pool:
1550
16. Deviated wells: Kickoff Depth: 8625 • feet
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 105 degrees
Downhole: 3354 - Surface: 2474
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Wei ht Grade Couolino L n th
MD ND MD I TVD in -l -ding -t-a data
4.7# 13Cr85 H511 1546'
8575' 8478'ss 10171' 8654'ss 63 sx Class'G'
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft):
Plugs (measured):
Effect. DepthMD (ft):
Effect. Depth TVD (ft):
Junk (measured):
9105 9051
8692
8692
8647
8828
Casing Length Size Cement Volume MD TVD
Conductor/Structural 78 20• 11 Yards AS 35-113 35-113
Surface 3461 10-3/4" 2910 cf AS III. 406 cf Class'G', 290 cu ft Class'G' 34-3495 34-3494
Intermediate 8500 75/8" 542 cu it MTC, 348 cu ft Class'G' 32-8532 32-8489
Scab Liner 3306 5-1/2" x 3-1@" 385 cu It Class'G' 5418-8724 5417-8678
Liner 889 5-1/2" 189 cu it Class'G' 8213-9102 8175-9048
Perforation Depth MD (ff): 8586-8783 Perforation Depth TVD (ft): 8542-8736
Hydraulic Fracture planned? Yes ❑ No 0
20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the Foregoing is true and the procedure approved herein will not be deviated Contact Name Browninq. Zachary H
from without prior written approval.
Authorized Name Egbeiimba, Uchenna J Contact Email Zachary.BrowningObp.com
Authorized Tire Engineering Team Leader - CTD & Contact Phone '1 907 564 5220
Authorized Signature Date
Commission Use Only
Permit to Drill 7�� /� �
Number: /-(1Z
Permit Approval
-7
See cover letter for other
LZZ
Date:
requirements:
Conditions of approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales:
—/
Other r70F' fts.�- -to 35 -OC 5T��j Samples req d: Yes ❑J No CLY Mud log mq'd: Yes ❑ / No W
f}✓h nU l a. V Py'` tic n 'T r / H2S measures Yes Id No ❑ Directional svy req'd: Yes EY No ❑
/
fo Z SOO /- S b 7 Spacing exception req'd: Yes ❑ No IV Inclination -only svy req'd: Yes ❑ No 12/1
✓
Post initial injection MIT req'd: Yes ❑ No
APPROVED BY �7
] ` I
Approved by: COMMISSIONER THE COMMISSION I q
Date: i I
� f/�� V77- Y / -f/ I f-
/�lm/ t Ot Revised 512017 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g))
"ORIGINAL
Submit Form and
Attachments in Duplicate
AAS
-3a
To: Alaska Oil & Gas Conservation Commission
From: Zach Browning
CTD Engineer
Date: June 19, 2017
Re: 04-38A Permit to Drill Request
OW by
Approval is requested for a permit to drill a CTD sidetrack lateral from well 04-38 with the
Nabors CDR2 Coiled Tubing Drilling rig on or around September 1g`, 2017.
Planned operations:
The proposed 04-38A CTD sidetrack will be an approximately 1500' Zone 2A/2B producer drilled with the
Nabors CDR2 rig on or around September ist, 2017. A 3-1/2" whipstock will be set pre -rig with a -line. The rig
will move in, kill the well and mill a 2.80" dual string window (3-1/2" x 5-1/2"), -10' long. The well kicks -off in
Zone 4 and will be drilled through the conglomerates and target reserves in Zone 2A/2B. The proposed
sidetrack is a -1500' horizontal Ivishak producer to be completed with a 2-3/8" 13Cr solid liner, cemented in
place and selectively perforated post rig. The liner cement job or liner top packer will isolate all parent
perforations.*
Post -Rig Work:
1. V: Tree work as necessary.
2. F: PT Liner lap
3. S: Set LGLVs. LTP set post rig
4. C/WWP: Perforate -550'.
5. T: POP and Test.
if needed, and test.*
eduled to be in Send
test BOPE 250 si low and 3,500 si hi h MASP 2,474 si .
0" Window.
V
ild section: 325" OH -653' 27 de DLS lanned .
eral section to TD: 3.25" OH, -953' 7 de DLS lanned .
/8" 13Cr liner leaving TOL at -8575' MD.
6.
Pump primarycement'ob: 13 bbls, 15.3 ppg Class G, TOC at TOL -8575' MD .*
7.
Freeze rotect well to a min 2,200' TVDss.
8.
Close in tree, RDMO.
* Approved alternate plug placement per 20 AAC 25.112(i)
Post -Rig Work:
1. V: Tree work as necessary.
2. F: PT Liner lap
3. S: Set LGLVs. LTP set post rig
4. C/WWP: Perforate -550'.
5. T: POP and Test.
if needed, and test.*
Mud Program:
• Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (489 psi over -balance).
Disposal:
• All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or
Pad 3 at DS 6.
• Fluids >1% hydrocarbons or flammables must go to Pad 3.
• Fluids >15% solids by volume must go to GNI.
• Fluids with solids that will not pass through 1/4" screen must go to GNI.
• Fluids with PH >11 must go to GNI.
Hole Size:
• 3.25" for production hole section from 8625' MD to 10,171' MD.
Liner Program:
• 2-3/8", 4.7 Ib/ft, H511, 13Cr 8575' MD - 10,171' MD (TD)
• A planned 13 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at -8575' MD).
• The primary barrier for this operation: a minimum EMW of 8.4 ppg (489 psi over -balance).
• A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi.
• The annular preventer will be tested to 250 psi and 3,500 psi.
Directional:
• See attached directional plan. Maximum planned hole angle is 1050, inclination at kick off point is 100. .
• Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
• Distance to nearest property - 46,970'
• Distance to nearest well within pool - 1550'
Logging:
• MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section.
Perforating:
• Perforating planned Post -rig: -550' of perforations. 1.56", 60 deg random phasing, 6 spf, pert guns.
Anti -Collision Failures:
• None. All offset wells pass BP anti -collision scan criteria.
• No wells were minor risked.
Hazards:
• DS 04 is an H2S pad. Latest H2S reading on the 04-38 was 36 ppm on 11/3/2016.
• One fault crossings planned, but Lost circulation risk in 04-38A is considered to be LOW.
o Fault is considered to be small and losses are not a significant issue in the area.
Reservoir Pressure:
• The reservoir pressure on 04-38A is expected to be 3,354 psi at 8,800' TVDSS (7.33 ppg equivalent).
• Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,474 psi.
• Amin EMW of 8.4 ppg for this well will provide 489 psi over -balance to the reservoir.
Zach Browning CC: Well File
CTD Engineer Joseph Lastufka
564-5220
TREE= 4-1/16'CIW
WELLHEAD
FMC
ACTUATOR
BAKER C
OKB. ELEV . -
53
BF. ELEV =
6
KOP=
7100'
Max Angle = 14' Q 7300 20" OONXK-70R —�
Datum M) = 8903' #,
Datum WD: 8800' SS p _
143/4' CSG, 45.5#, J-55,1)=9.953- -- �3494
Minimum
-55,D=9.953 -
Minimum ID = 2.75" @ 6600'
34/2' HES XN NIPPLE
4 -1/2 -TBG, 12.6#, 13CR-80 t1 , 5405
.0152 bpf, D= 3.958"
TOPOF St/2 X 3-12' SCAB LNR
TBG, 9.3#, 13CR-80 FOX, - 6622'
'bpf, D = 2.992
LB LNR 17#, NI80S NSCC 8195'
D = 4.892'
TOP OF 5-12"LNR 213'
7-5/8' CSG, 29.7#, L-80, D = 6.875' —
L72- LNRSCAB, 9.2#, 13CR-80 NSCr,
8087 bpf, D= 2.992
PERFORATION SUKWARY
REF LOG: ARRAY SONG ON 09/01/91
ANGLE AT TOP F4 : 100 @ B586'
Note: Refer to Roduction DB for historical perf data
SIZE
SPF
NTHNAL CpnSgz
SHOT
SOZ
2
6
8586-9596 O
04/15/15
CH r
2-1/2'
6
8616-8632 S
10/31/9506/03/05
04127117 CJNUM) GLV GO (0424/17)
3-38'
4
8650-8662 S
09/05/91
02108)95
2-12'
6
8650-8662 S
10/31/95
0&03/05
3-38'
4
8662-8675 S
09/05!91
0&03/05
2-12"
6
8733-8740 C
0326/09
2-12'
6
8754-8756 C
0326/09
2-12"
6
8773 - 8783 C
0&14105
2-18'
4
8898-89 S
1010791
08/03/05
2-1/4"
4
8916-8923 S
102391
W03105
2-1/4'
4
8927 - 8937 S
1023!91
08103105
13CR410, .0232 bpf, D
" p A _3 Q SAFE, , NOTES: "'CHROME TBG, LNR 8 SCAB LNR"'
�T V 2162' 4-1/2"CAM TRCF SSSV tom, D=3.812'
LOCKED OLfr (0
0825108))
me i FT MA navxa c
$346' 7-58" X 4-12' BKR SABL-3 PKR D =
J 4-12"X3-12'XO.D=2.81'
(FLUGV BE TIGHT)
7-518"X 5-1/2 SLI+6 LNR HGR D =,
656T (—{S12'X312'6102 S3F16Z D=
6600' 3-12"FES XN NP, =D
13.1/*VAM. D=2.99' 1
X
871W 1—j3.12'VN-EG,D=2.87'
_IEMD Tr NOT LOGO
FISH - QUICK DRLL COMPOSITE PLUG -
MLLED 8 PUSHED OUT TAL PPE (09/07106)
STOP OF CMT (82/05)
D
DATE
REV BY
I COMAENTS
DATE REV BY COMA94TS
0910691
ORIGINAL COMPLETION
02375/17 BS/JM) UPDATED PERF TABLE
DO
0.16
CH r
DATE
0312795
616
I
04127117 CJNUM) GLV GO (0424/17)
04115/15 TC—UPJC
ADPE RFS
2
5278
5276
PERF/ LNR/ CSC/TBG UPDATES
A-KBMG_-DRAM
16
00484/117
GLV CIO (09/06116)
$346' 7-58" X 4-12' BKR SABL-3 PKR D =
J 4-12"X3-12'XO.D=2.81'
(FLUGV BE TIGHT)
7-518"X 5-1/2 SLI+6 LNR HGR D =,
656T (—{S12'X312'6102 S3F16Z D=
6600' 3-12"FES XN NP, =D
13.1/*VAM. D=2.99' 1
X
871W 1—j3.12'VN-EG,D=2.87'
_IEMD Tr NOT LOGO
FISH - QUICK DRLL COMPOSITE PLUG -
MLLED 8 PUSHED OUT TAL PPE (09/07106)
STOP OF CMT (82/05)
D
DATE
REV BY
I COMAENTS
DATE REV BY COMA94TS
0910691
ORIGINAL COMPLETION
02375/17 BS/JM) UPDATED PERF TABLE
02308/95
0.16
RWO (SCAB LN R)
04/11/17 CJNJM) MNDR EDITS TO WBS
0312795
616
RIND
04127117 CJNUM) GLV GO (0424/17)
04115/15 TC—UPJC
ADPE RFS
04/16115
PJC
PERF/ LNR/ CSC/TBG UPDATES
09/07/16J
GLV CIO (09/06116)
WHJ_FEAD
C
Flub
ACTUATOR
DATE REV BY COMu NTS
OKB. ELLV •
53'
BF. HEV =
KOP=
7100'
Max Angle
Datum NO
_
Datum TVD;
88W'SS
5-72'
PROPOSAL
10-3/4' CSG, 45.5#, 9-559 D = 9.953' 3494'
Minimum ID =
4-1/2' TBG, 12.89, 13CR-80 NSCT, —5406-
.0152
405'.0152 bpf, D = 3.958'
TOP OF 5-1/2' X 11/2' SCAB LNR 6409'
11/2' TBG, 9.309 13CR$0 FOX,
.0087 bpf, D = 2.992'
5-'12 SCAB LNR 170, Nr80S NSCC
.0232 bpf, D = 4892'
LNR
1 7-5/8- CSG, 29.70, L-80. D= 6.875' 1
,SCAB, 920, 13CR-80
D = 2.992'
PERFORATION SL&"RY
REF LOG: ON
ANGLE AT TOP PERF: '@ '
Note: Refer to Production DB for historical cert data
D = 4.892 9103'
04-38A SAFL NOTES:—CHROME TBG, LKRBSCAB LNR—
GAS LFT MANTIRR S
1
D = 3.94'
1-12' X 3-M. X0. D = 2.81'
(PLUG WLL BE TIGFIr)
r-5/8' X 5-12' SL4-6 LNR HGR D = 4.88'
6567' HS-1/YX3-1/2'BKRS-3H(RID=2.82-
8600' kf3-1/2' HES XN NP MILLED TO 2.80"
6622' 11/2' WLEG, D=2.99'
15-12'X112'XO, 9)=2.8T I
DATE
I
I OORMENTS
DATE REV BY COMu NTS
09/06197
T
I MD
02/06195
r
IaNO (SCAB LNI;Q
r
DATE
WO
0524117
2
522 8
5276
1
A-KBMG
OMY
BKS
1
00720/09
1
D = 3.94'
1-12' X 3-M. X0. D = 2.81'
(PLUG WLL BE TIGFIr)
r-5/8' X 5-12' SL4-6 LNR HGR D = 4.88'
6567' HS-1/YX3-1/2'BKRS-3H(RID=2.82-
8600' kf3-1/2' HES XN NP MILLED TO 2.80"
6622' 11/2' WLEG, D=2.99'
15-12'X112'XO, 9)=2.8T I
DATE
RLV BY
I OORMENTS
DATE REV BY COMu NTS
09/06197
—ml
OTSGINALCOMPLETTON
02/06195
r
IaNO (SCAB LNI;Q
0327095
D.16
WO
0524117
CTD(04-39A)
0524/17
JMD
BULTCTDPROPOSAL
2.7D' SEALBORE DEPLOY SLY, D=225'
2-3/8' X NP, D= 1.813-
MLLOUT WINDOW (04-38A) 8625' -
PBTO
11, .0039 bpf, ID = 1.995'
PRUDI-DE BAY Mr
WELL: 04-38A
PEFUT ND:
AA No: '500292221001
T1 IN, Rl5E 383FSL 8 655 FE-
BP
EL
BP Exploration (Alaska)
Well 0438A ' -)R2-AC BOP Schematic
Quick Test Sub to Otis -1.1ft � � --'— ---- �-_--__-_-
Top of 7" Otis O.Oft —._. _.—.—._._._. _
Distances from top of riser
Excluding quick -test sub
Top of Annular I 0.0 ft i
Top Annular Element 0.7 ft
Bottom Annular
CL Blind/Shears 3.3 t
Cu 2" Combi's 4.1 ft --1
Deployment
CL 2-3/8" Combi's
CL 2 3/8" Combi's
CL Blind/Shears
CL 2" Combi's
CL of Top Swab
CL of Bottom Swab
CL Flow Tee
CL of SSV
CL of Master Valve
LDS
Gound Level
7.4ft
81
Kill Line
10.0 ft �
10.7 ft
13.3 ft
14.8 f[
16.2 ft
BOP2
17.5 ft
}
Fusable
19.0 k BOPt
20.5 ft
--q
Ite 15 -Jun -17
` \ 7-1/16" 6k Flange x T' Otis eox
11-- Swab 2
Swab 1
r�
Test Pump Hose
: '`'' s b
1.�I♦',.
North America - ALASKA - BP
Prudhoe Bay
PB DS 04
04-38
04-38A
Plan: 04-38A WP08
BP Coil Tubing Report
19 June, 2017
FUa
BAKER
HUGHES
W005
PB DS 04, TR -11-15
2 :
by
10000
BAKER
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 04
Well:
04-38
Wellbore:
04-38A
Design:
04-38A WP08
BP
PB DS 04, TR -11-15
//.Fa\
BP Coil Tubing Report
BAKER
From:
Map
FRMIS
Local Coordinate Reference:
Well 04-38
Slot Radius:
TVD Reference:
Mean Sea Level '
(usft)
MD Reference:
53 : 38 8/21/1991 00:00 @ 53.00usft (generic drilling dg
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM RSK- Alaska PROD -ANCP1
Project Prudhoe Bay, GPB, PRUDHOE BAY
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27. OGP-Usa AK [4267'15864] Using Well Reference Point
Map Zone: NAD27'OGP-Usa AK/Alaska zone 4[26734'1586• • Using geodetic scale factor
Site
PB DS 04, TR -11-15
Site Position:
Northing:
From:
Map
Easting:
Position Uncertainty:
0.00 usft
Slot Radius:
Well
W IIP
04-38, 04-38
(usft)
e usition +NI•S 0.00 usft Northing:
+EI -W 0.00 usft Easting:
Position Uncertainty 0.00 usft Wellhead Elevation:
Wellbore 04-38A
Magnetics Model Name Sample Date Declination
(I
BGGM2016 10/1/2017 17.77
Design
04-38A WP08
Audit Notes:
Version:
Phase:
PLAN
Vertical Section:
Depth From (TVD)
+wS
(usft)
(usft)
-20.98
0.00
5,953,265.350 usft
711,234.970 usft
0.000 in
5,952,236.750 usft
712,164.070 usft
20.98 usft
Latitude:
Longitude:
Grid Convergence:
Dip Angle Field Strength
V) (nn
81.02 57.545
Tie On Depth: 8,588.50
+E/411 Direction
(usft) 11
0.00 250.00
Latitude:
Longitude:
Ground Level:
70° 16'31.598 N
148' 17'27.907 W
1.61 "
70° 16'21.228 N
148' 17' 1.707 W
• 18.60 usft
6/19/2017 1:06.38PM Page 2 COMPASS 5000.1 Build 81O
BP BAKER••
BP Coil Tubing Report
HUGHES
Local Coordinate
Reference:
p'510vee
TVD Reference:
Mean Sea Level
Company: North America
- ALASKA - BP
Project: Prudhoe Bay
53 : 38 81211199100:00
@ 53.00usft (generic drilling rig
Site: PB DS 04
North Reference:
Well: 04-38
Wellbore: 04-38A
Survey Calculation Method:
Minimum Curvature
Design: 04-38A WP08
Database:
Survey Tool Program Date 6/19/2017
EDM R5K - Alaska PROD - ANCP1
From To
Description
(usft) (usft)
Survey (Wellbore)
80.20 8,588.50
1 : Schlumberger GCT multishot (04-38)
8.588.50 10,171.53
04-38A WP08 (04-38A)
Planned Survey
MWD
MWD - Standard
MD Inc
AN
NDSS
(usft) 1°I
1°I
Easting
(usft)
8,588.50
10.03
152.46
8,491.67
04-38A Actual Survey
(usft)
(°1100usI)
(usft )
8,60.00
10.08
152.46
8,502.99
8,605.70
10.10
152.46
8,508.61
04.38A Actual Survey
292.46
5,951,833.642
712,468.001
8r623.00
10.13
152.51
8.525.64
04-38A Actual Survey TIP
5,951,832.770
712,468.487
0.41
8,625.00
10.15
152.49
8,527.61
KOP
712,469.966
0.18
-134.60
8,645.00
11.95
152.49
8,547.23
End 9deg/100ft
1.02
-134.64
-9.99
8,675.00
20.05
152.49
8,576.05
6
-135.14
0.00
426.16
8,700.00
25.52
142.01
8,599.10
8,800.00
50.52
123.84
8,677.48
8,900.00
76.77
115.91
8,721.54
8,906.83
78.58
115.46
8,723.00
7
27.17
-168.44
-31.82
9,000.00
84.72
140.30
8,736.73
9,037.07
87.50
150.00
8,739.25
8
5,951,729.352
712,613.399
27.17
9,100.00
87.87
167.00
8,741.81
9,200.00
88.83
194.00
8,744.74
BP BAKER••
BP Coil Tubing Report
HUGHES
6119/2017 1 r06:38PM Page 3 COMPASS 5000.1 Build 61D
Local Coordinate
Reference:
Well 04-38
TVD Reference:
Mean Sea Level
MD Reference:
53 : 38 81211199100:00
@ 53.00usft (generic drilling rig
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Tool Name
Description
GCT -MS
Schlumberger GCT multishot
MWD
MWD - Standard
WS
EIW
Northing
Easting
DLeg
V. Sec
TFace
(usft)
(usft)
(usft)
(usft)
(°1100usI)
(usft )
1°1
-409.76
291.53
5,951,835.395
712,467.023
0.00
-133.80
0.00
411.54
292.46
5,951,833.642
712,468.001
0.41
-134.07
0.00
-412.42
292.92
5,951,832.770
712,468.487
0.41
-134.20
0.00
-415.12
294.32
5,951,830.118
712,469.966
0.18
-134.60
16.34
415.43
294.49
5,951,829.808
712,470.137
1.02
-134.64
-9.99
-418.83
296.26
5,951,826.460
712,472.003
9.00
-135.14
0.00
426.16
300.07
5,951,819.243
712,476.024
27.00
-136.22
0.00
-434.21
305.37
5,951,811.341
712,481.549
27.17
-138.45
-41.50
473.42
351.56
5,951,773.453
712,528.818
27.17
-168.44
-31.82
-517.00
428.85
5,951,732.074
712,607.305
27.17
-226.17
-17.11
-519.89
434.87
5,951,729.352
712,613.399
27.17
-230.83
-13.49
-576.13
506.90
5,951,675.170
712,686.984
27.17
-279.28
78.02
-606.44
528.00
5,951,645.466
712,708.931
27.17
-288.74
74.35
-664.73
550.96
5,951,587.848
712,733.523
27.00
-290.38
89.10
-763.76
550.09
5,951,488.838
712,735.447
27.00
-255.69
88.41
6119/2017 1 r06:38PM Page 3 COMPASS 5000.1 Build 61D
by100#41100#41
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 04
Well:
04-38
Wellbore:
04-38A
Design:
D4 -38A VVP08
Planned Survey
MD
(usft)
9,277.86
End 27deg/100ft
9,300.00
9,400.00
9,500.00
9,600.00
9,700.00
9,707.86
10
9,800.00
9,900.00
9,931.80
11
10,000.00
10,031.39
12
10,100.00
10,171.53
TD at 10171.53
BP
Art
•■
BP Coil Tubing Report
EIW
BAKE
Easting
DLeg
HUGHES
Local Coordinate Reference:
Well 04-38
P)
TVD Reference:
Mean Sea Level
(usft(
MD Reference:
53 : 38 8/21/1991 00:00 @ 53.00usft (generic drilling rig
North Reference:
True
(•)
Survey Calculation Method:
Minimum Curvature
8,745.72
Database:
EDM R5K - Alaska PROD - ANCP1
5,951,417.516
Inc
Art
TVDSS
WS
EIW
Northing
Easting
DLeg
V. Sec
TFace
(°)
P)
(usft)
(usft)
(usft(
(usft(
(usly
(°1109usf0
(usft)
(•)
89.76
215.00
8,745.72
-834.21
517.99
5,951,417.516
712,705.343
27.00
-201.43
87.62
89.78
216.55
8,745.80
-852.17
505.04
5,951,399.197
712,692.913
7.00
-183.13
89.00
89.91
223.55
8,746.07
-928.67
440.74
5,951,320.917
712,630.795
7.00
-96.54
88.99
90.04
230.55
8,746.12
-996.77
367.59
5,951,250.789
712,559.600
7.00
-4.51
88.98
90.16
237.55
6,745.94
-1,055.44
286.69
5,951,169.859
712,480.391
7.00
91.58
8897
90.28
244.55
8,745.55
-1,103.83
199.25
5,951,139.035
712,394.349
7.00
190.30
8898
90.29
245.10
8,745.51
-1,107.17
192.14
5,951,135.491
712,387.333
7.00
198.13
69.01
96.35
247.31
8,740.18
-1,144.27
108.02
5,951,096.036
712,304.298
7.00
289.86
20.00
102.92
249.78
8,723.45
-1,180.33
16.33
5,951,057.407
712,213.664
7.00
388.36
20.13
105.00
250.59
8,715.78
-1,190.79
-12.70
5,951,046.131
712,184.945
7.00
419.21
20.54
105.00
255.53
0,698.12
-1,209.98
-75.70
5,951,025.172
712,122.513
7.00
484.98
89.36
105.00
257.81
8,690.00
-1,216.98
-105.20
5,951,017.352
712,093.223
7.00
515.09
89.71
105.00
262.78
8,672.24
-1,228.15
-170.51
5,951,004.345
712,028.263
7.00
580.27
89.36
105.00
267.97
8,653.73
-1,233.72
-239.35
5,950,996.835
711,959.608
7.00
645.87
89.33
6119/2017 1:06:38PM Page 4 COMPASS 5000.1 Build BID
e,..,
BP
.000,41p BP Coil Tubing Report
BAKER
HUGHES
Company: North America - ALASKA -BP
Local Coordinate Reference: Well 04-38
Project: Prudhoe Bay
TVD Reference:
Mean Sea Level
Site: PB DS 04
MD Reference:
53 : 38 8121/199100:00 @ 53.00usft (generic drilling rig
Well: 0438
North Reference:
True
Wellbore: 04-3aA
Survey Calculation Method:
Minimum Curvature
Design: 04-38A WPDB
Database:
EDM R5K -Alaska PROD -ANCP7
Targets
--- - -�
Target Name
-hidmiss target Dip Angle Dip Dir. TVD -NI-S
+E/-W
Northing
Easting
-Shape (°) (1) (usft) (usft)
(usft)
(usft)
(usft)
Latitude
Longitude
04-38A T3 0.00 0.00 8,683.00 -1,221.70
-127.47
5,951,012.000
712,071.100 70° 16'9.212 N
148° 17'5.417 W
- plan misses target center by 0.91 usft at 10055.18ush MD (8683.84 TVD, -1221.49 N, -127.73 E)
- Point
04-38A Fault 2 0.00 0.00 D.00 -573.36
722.09
5,951,684.000
712,902.000 70° 16' 15.589 N
148° 16'40.685 W
- plan misses target center by 8504.15usft at 8558.50usft MD (8491.67 TVD, 409.76 N, 291.53 E)
- Polygon
Point 0.00 0.00
0.00
5,951,684.00
712,902.00
Point 0.00 -722.03
450.85
5,950,975.00
713,373.00
04-38A T4 0.00 0.00 8,654.00 -1,234.58
-238.48
5,950,996.000
711,960.500 70° 16' 9.086 N
148° 17'8.649 W
- plan misses target center by 0.89usft at 10170.69usft MD (8653.93 TVD, -1233.69 N, -238.54 E)
- Point
04-38A Ply D.00 0.00 0.00 -254.61
406.03
5,951,993.700
712,577.100 70° 16' 18.724 N
148" 16'49.886 W
- plan misses target center by 8493.86usft at 8588.50usft MD (8491.67 TVD, -409.76 N, 291.53 E)
- Polygon
Point 1 0.00 0.00
0.00
5,951,993.70
712,577.10
Point 0.00 -396.25
243.94
5,951,604.50
712,832.10
Point 0.00 -653.34
281.81
5,951,348.60
712,877.20
Point 0.00 -1,026.98
-34.57
5,950,966.20
712,571.50
Point 0.00 -1,190.32
-851.74
5,950,779.90
711,759.30
Point 0.00 -752.92
-802.08
5,951,218.50
711,796.60
Point 0.00 -716.86
487.93
5,951,263.40
712,109.60
Point 0.00 -577.49
-80.42
5,951,414.20
712,513.00
Point 9 0.00 -248.61
-177.39
5,951,740.20
712,406.80
04-38A T2 0.00 0.00 8,740.00 -1,079.24
248.72
5,951,165.000
712,443.100 70° 16' 10.613 N
148° 16'54.467 W
- plan misses target center by 5.87usft at 9644.80usft MD (8745.80 TVD, -1078.44 N. 248.25 E)
- Point
04-38A Fault 1 0.00 0.00 0.00 -627.19
218.35
5,951,616.000
712,400.000 70' 16' 15.059 N
148° 16'55.350 W
- plan misses target center by 8494.77usft at 8588.50usft MD (8491.67 TVD, -409.76 N, 291.53 E)
- Polygon
Point 0.00 0.00
0.00
5,951,616.00
712,400.00
Point 0.00 -947.34
564.55
5,950,685.00
712,991.01
04-38A Ti 0.00 0.00 8,740.00 -590.04
497.72
5,951,661.000
712,678.200 70° 16' 15.425 N
148° 16'47.217 W
- plan misses target center by 16.16usft at 9006.39usft MD (6737.29 TVD, -581.09 N, 510.89 E)
6/192017 1: 06:38PM Page 5
COMPASS 5000.1 Build 81D
%4#00
BP-
�►NT
f"
BP Coil Tubing Report
�K R•■
HUGMS
Company:
North America-
ALASKA -BP
Local Coordinate Reference:
Well 04-38
Project:
Prudhoe Bay
Site:
PB DS 04
TVD Reference:
Mean Sea Level
Weil:
0438
MD Reference:
53: 38 8/21/1991 00:00 Q 53.00usft (generic drilling rig
North Reference:
True
Wellbore:
04-38A
Survey Calculation Method:
Minimum Curvature
Design:
04-38A WPOB
Database:
EDM R5K-Alaska PROD -ANCP1
- Point
Casing Points
-
--
Measured
Vertical
Casing Hole
Depth
Depth
Diameter Diameter
(usft)
Will
Name
(in) (in)
8.625.00
8,527.61
5 1/2" X 3 1/2" Planned TOWS
3.500 3.500
10,171.53
8,653.72
23/8"
2.375 3.000
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/-S
+E/-W
'
(usft)
(usft)
(usft)
(usft)
Comment
8,588.50
8,491.67
-409.76
291.53
04-38AActual Survey
8,605.70
8,5D8.61
412.42
292.92
04-38A Actual Survey
8,623.00
8,525.64
-415.12
294.32
0438AActual Survey TIP
8,625.00
8,527.61
-415.43
294.49
KOP
8,645.00
8,547.23
418.83
296.26
End 9deg/100ft
8,675.00
8,576.05
-426.16
300.07
6
8,906.83
8,723.00
-519.89
434,87
7
9,037.07
8,739.25
-606.44
528.00
8
9,277.86
8,745.72
-834.21
517.99
End 27deg/100%
9,707.86
8,745.51
-1,107.17
192.14
10
9,931.80
8,715.78
-1,190.79
-12.70
11
10,031.39
8,690.00
-1,216.98
-105.20
12
10,171.53
8,653.73
-1,233.72
-239.35
TD at 10171.53
Checked By:
Approved By:
Date:
6/19/2017 1:08:38PM Page 6 COMPASS 5000,1 Build 81D
\�
2
by
PmjeOF PrutlhOeary
Sib: Pa0804
WNI: 0438
a.�.mmTuwm
N,eMexaM 17.
NePwwrrO
WELLBORE nEfAILS: 0438A
04381
BEf91Eu0ENfaam3WN
Cow (NEInebww Wm04x, Tro1bN
n..
M.■
a-Y!w
WNWgre: 040&4
seervN.crwan
Doaw�.°1
VeF(WDlneWm . N hew N
BAM
t6.50
Plan 043BA WPO810A-jelpl-]BAI
Parent WINIDore 0438
s.cwn N511mteienw sall0a0x, o.Wn
Mwur Dept PMenw 51 AWIll%IWAD@MANry19e�udAMFi1
p��/t�!!e
HUGM
NOMing
EasGng
Noel Brrimll
Tieon MO: 8586.50
LongiWtle
SIM
"S
0.00
000
5952236]50 712164070 70'16.2122aN
aoaemn Nemo. Brauuencavee.e
Vertical Section at 250.00° (50 us W in)
WELL WTNLS; 0438
GIouMLweL
t6.50
H -W
NOMing
EasGng
LaWWEe
LongiWtle
SIM
"S
0.00
000
5952236]50 712164070 70'16.2122aN
148.17'V07W
04-381
WP08
SECTIONOETA&S
ANNOTATIONS
4001
Sec
MD
Inc
Azi %TVD
.MLS
+EFW
Oleg
TF,,VSwt Target
TVD MD Amoleim
1
858850
10.03
152.46 8491.67
409.76
291.53
0.00
0.00 -133.60
8491.67 858&50 043&AACImISuaey
sw
04-38A Fnu82
2
6605.70
10.10
152.46 8508.61
412.42
29292
0.41
0.00 -134.20
8508.61 860&70 0438AActual5uruay
w 38 4-3k
3
662310
10.13
152.51 8525.64
415.12
294.32
0.18
1634 -134.60
8525.64 8623.00 0436AAcIWSumyTlP
I 400.
4
6625.00
10.15
152.49 8527,61
415.43
294.49
1.02
-9.99 -134.64
0527.61 8625.00 KOP
5
6645.00
11.95
152.49 654723
418.83
296.26
9.00
0.00 435.14
8547.23 8645.00 End9deg11008
2
o4.3aA raldll 04-38ATI
6
8675.00
20.05
152.49 8576.05
426,16
300.07
27.00
040 436.22
8576.05 8675.00 6
-700
7
890683
78.58
115.46 8723,00
61919
434.87
27.17
41.50 -23013
6723.00 8906.83 7
8
9037.07
87.50
150.00 8739.25
60614
528.00
27.17
78.02 -288.74
8739.25 9037.07 8
c
0 .im
9
927716
89.76
215.00 8745.72
434.21
517.99
27.00
89.10 -201.43
8745.72 9277.85 End27dagllOD8
10
970716
90.29
245.10 8745.51
4107.17
19214
7.00
8910 198.13
8745.51 9707.86 10
11
9931.80
105.00
25059 8715.78
-1190.79
-12.70
740
20.00 419.21
871578 9931.80 11
+ -9w
+
12
10031.39
105.00
257.81 869040
.1216,98
-10520
7.00
90.00 515.09
8690.00 10031.39 12
C
13
70171.53
705.00
267.97 8653.1
-7237.72
-23935
7.00
90.00 64617
8653.73 10171.53 TON 10171.53�0
-two
u4aenn
s uwl
O4i8AT3
0.1200:
W-34AT4
04-3&0138A
-15W
-1800
17wi
-WU -550 400
-300 WO -100 0 100 200 300 400 500 6w 700 850 900 1000 1100 1200
West( -)/East(+) (100 usft/in)
$500
w-JaAACWNSnrvey P KOP 04-38A
WP08
C
9558
800
fnd9&g/IOOfi '
6
0438A T4
h
8650-
W -39A N
-
C
04-38/ 39A
8700.
7
B
04-38A'IY
Mat 1017153
Q12
8750
-
II
5Wj
04-38ATI
10
'
smo.
-
8850
3
F
Nw.
tl950 -
Mean
-
i04
-38n4 -3e
-900
-7M
-0w fi90 S00 -550
-Sw
450 1100
-3% JOU -250 .WO
-150 -100 -w 0 50 100
Iso
200 250 300 350
NO 450 500 550 600 6.io 700 750 NO 950 900 9% Iwo loso Ilw 1150
Vertical Section at 250.00° (50 us W in)
FUNep �. xom WELMORE DETAILS: 00.38A REFS .EIWORM131ax
Project: PSDB Bay xwa wx.m.1+_
514e: P OS OC i
WaN: 04,38 NgnXVFW 00.384 CDa'enYolN Releierc¢ WeY06JB.iiuNwN ME
Obp Bleryh e1a1.b vn N.NOl Rnwece W.(MON.00
Wellbore: O138A apxax:n Saem0'slRepren®. spolBUBx.9oBEl BAKER
o.. ro�w1 Parent Wellbore: 00.38
PIen:00.38A WPOB (Oh38'00.08A) xbwrm 0ecn Reprence sJ JB Brzul ssl oam SJ BBw'n lg�re�i�enon i I
xsaseraxan Tam MD: 8588.50 cap�pm�xtmoe tiwmwncuweme @ are
HUGHES
-65
-130
-195
-MO
-3z5
a90
-455
-520
-585
-650
C
415
J
-980
+ -845
p -910
-975
t
VI
1105
-1170
-1335
-1300
-1365
-1430
-1495
-1560
-1625 WN l
-1690
Me80 Sea Le9ei -910 -845 480 -715 -M -585 -530 455 -390 -325 360 -195 -130 -65 0 65 130 195 360 325 390 455 520 585 650 715 780 845 910 975 ]NO 1105 1170 1235 1300 1365 1430 1495
West( -)/East(+) (65 usf in)
Project: Prudhoe Bay
Site: PB DS 04
Well: 04.38
Wellbore: 04.38A
Plan: 04-38A WP08 (04.38/04-38A)
ANTI -COLLISION SETTINGS
COMPANY DETAILS: North Amenca-ALASKA - BP
Interpolation Method: MD, interval: 25.00 Galculabon Mearod: Mmonum Curvature
Depth Range From: 8588.50 To 10171.53 Error System: ISCWSA
Results Limited By: Centre Distance: 1213.95 Scan Method: Tray. Cylinder North
Reference: Plan: 0438A WPOS (04.38/04-38A) Error Surface: Elliptical Conic
Wamino Method: Rules Based
FIN
BAWK�EER�•�•�
HUGHES
LEGEND
w 00.38. 0138, 0138 V1
Project:
Prudhoe Bay
Interpolation Method: MD, interval: 25.00
PB04
Well:ell:
Oby
04.368
Wellbore:
04.38A
Plan: 04-3BA WP08 (04.38104.38A)
Possible Magnetic Interference:
From KOP to 8,780' MD
ANTI -COLLISION SETTINGS
COMPANY DETAILS: North America -ALASKA -BP
Interpolation Method: MD, interval: 25.00
Calculation Method: Minimum Curvature
Depth Range From: 8588.50 To 10171.53
Error System: ISCWSA
Results Limited By: Centre Distance: 1213.95
Scan Method: Trw.. Cylinder North
Reference: Plan: 04-38A WPOB (04.38104.38A)
Error Surface: Elliptical Conic
Warning Method: Rules Based
Depth Range: 8588.50 To 10171.53
From Colour Ta MD
8589 8780
8780 8900
8900 10172
Vi17
F110 112
BAKER HUHES
c�oo.d ltM: uw
+ws .aw 9mMm9 Euap e.awa. lonal61d. sloe
o.w am aeaaa3r.7w nnam9 7Vuaaaa 1a•IrIM
Sec MO Inc Aa NO +NIS +FJ -W 0109 TFace V d
1 8588.50 10.03 152.46 8491.67 -409.76 291.53 OAD 0.00 -133.80
2Bfi05.70 10.10 152.46 8509.61 -412.42 292.92 0.41 0.00 -1M.20
3 Bfi23.D0 10.13 152.51 8525.64 415.12 294.32 0.18 16.34 -134.60
4 8625.00 10.15 152.49 8527.61 415.43 294.49 1.02 -9.99 -134.64
5 8645.00 11.95 152.49 8547.23 418.83 298.28 9.00 0.00 -135.14
6 8675.00 20.05 152.48 8576.05 428.16 300.07 27.00 0.00 -136.22
7 8908.63 78.58 115.46 8723.00 .519.89 434.87 27.17 41.50 -230.83
8 9037.07 87.50 150.00 8739.25 $08.44 528.00 27.17 78.02 .288.74
9 9277.86 89.76 215.00 8745.72 SM.21 517.99 27.00 89.10 .201.43
10 9707.88 90.29 245.10 9745.51 -1107.17 192.14 7.00 89.00 198.13
11 9931.90 105.00 250.59 8715]6 -119079 .12.70 7.00 20.00 419.21
12 10031.39 105.00 257.81 6690.00 -121688 -105.20 7.00 90.00 515.09
13 10171.53 105.00 267.97 8653.73 -1233.72 -239.35 7.00 90.00 sail
6U0.VEYPR03a4M
OW:N17L 1KO :WCa VfealM'.Y% V ww
)ry Fmm D. To swrylPW T-1
420 aW&50 a6T44S
Se 1P171e3 waar,vcael M, awn
Contact Into �1�1 24 12
kse V919Vei-Tech5n10 PM,. rMa
W407044784379 Ce1PMne907-341-7fi0a EmergercyigYoshalkagarsingh SwveyManager+6fa�€49e°oua vl
907342-2436 Cel Phone
TwSWrdivant ODCoGninater 2 22 200 40
907-205-6294 Cel Phone
PaInck Miler MWDCoordinalar
907-952-3497 Cel Phone 180 2 240 60
canu9ich- Opefa82-5534 ns CelPo na Azimuth from North [0] vs Centre to Centre Separation [10 usfUin] 180
907-382-5534 Cel Pnone Azimuth from North t°] vs Centre to Centre Separation 140 usr
"Vol
r'.
� p
North America - ALASKA - BP
Prudhoe Bay
PB DS 04
04-38
USA00001143
04-38A
04-38A WP08
Travelling Cylinder Report
19 June, 2017
rias
BAKER
HUGHES
FrA Fla
by Travelling CyyIli der Report BAKER
HUGH
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 04
Site Error:
0.00 usft
Reference Well:
04-38
Well Error:
0.00 usft
Reference Wellbore
04-38A
Reference Design:
04-38A WPO8
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 04-38
Mean Sea Level
53: 38 8/21/1991 00:00 @ 53.00usft (genenc
drilling ng)
True
Minimum Curvature
1.00 sigma
EDM RSK - Alaska PROD - ANCP1
Offset Datum
Reference
04-38A WPO8
GCT -MS
Filter type:
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
WARNING: There is hidden fight data in this project
Interpolation Method:
MD Interval 25.00usR Error Model:
ISCWSA
Depth Range:
8,588.50 to 10, 171.53usft Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 1,213.95 usft Error Surface:
Elliptical Conic
Survey Tool Program Date 8/19/2017
From To
(usft) (usft) Survey(Wellbore)
80.20 8,588.50 1 : Schlumberger GCT mulfishm (04-38)
8,588.50 10,171.53 04-38A WP08 (04-38A)
Casing Points
Tool Name
Description
GCT -MS
Schlumberger GCT multishol
MWD
MWD -Standard
Measured
Vertical
Casing
Hole
Depth
Depth
Reference
Diameter
Diameter
(usft)
(usR)
Name
(in)
(in)
3,494.00
3,439,82
103/4"
10.750
13.520
8,531.00
8,435.02
75/8"
7.625
9.875
8,625.00
8,527.61
51/2" X 31/2" Planned TOWS
3.500
3.500
10,171.53
8,653.72
23/8"
2.375
3.000
Summary
PB DS 04 - 0438 - 0438 - 04-38
Reference
Offset
Centre to
No -Go Allowable
onset
Measured
Measured
Centre
Distance Deviation
Warning
Site Name
Depth
Depth
Distance
(usft) from Plan
Reference OmM
(usm (earn
Offset Well -Wellbore -Design
(usft)
(usft)
(usft)
lush)
NO eP
Diva..
(usnl
PB DS 04
B.6Dow 9.503.00
8.600.00
8,503.00
am
0.03
04-08 - 04-08 - 04-08
-41154
29248
Dam
0 D
Out of range
04-09 -04-09 - 0409
8.62500 8,52761
8.62500
552791
am
Out of range
04-09 - 04-09PB1 - 04-09PB1
41543
284.49
0.000
000
Out of range
04-10 - 04-10 - 04-10
B.fi49.98 8,552.09
8,650.00
8,552.21
0.00
Out of range
04-38-0438-0438
8,888.50
9,075.00
263.36
9.32 263.38
Pau - NOERRORS
04-41 - 04-41 - 0441
8.67465 9,57572
8,675.00
8,576.79
0.01
Out of range
0441 - 04-41 A- 04-41A
-42336
298.70
0000
3.18
Out of range
0441 - 04-41 A- Plan #5
SAM 8.597.83
0,70000
9,80137
002
Out of range
04-41 - D4-41APB1 - 04-41APB1
-42738
300.94
0.000
833
Out of range
04-41 - 04-41APB2 - 04-41APB2
5721.36 8,617.95
8,72500
8,625.93
003
Out of range
Offset Design
PB DS 04 - 0438 - 0438 - 04-38
onsetsne Error. 0,00 usft
survey Program: 80.GCT-MS
Rmerence
onset
Semi Major Axis
Rule Assigm,& NOERRORS
Onset Mhll EDor: 0.00 usft
Measured Vertical
Depth Miss
bean( (earn
Measured
mob
osm
Vemcal
osob
(usm
Reference OmM
(usm (earn
Toolrace
Azimuth
V)
Ousel wellbore comm
mow. S -Vi
(usnl (usn)
Casing-
HPNsim
pal
comm to
comm
luanl
NO eP
Diva..
(usnl
Allowable warning
Devisnan
lusnl
B.6Dow 9.503.00
8.600.00
8,503.00
am
0.03
-1240
-41154
29248
Dam
0 D
002
0.00 Pass - NOERRORS
8.62500 8,52761
8.62500
552791
am
0.10
-106.95
41543
284.49
0.000
000
003
0.06 Pass. NOERRORS
B.fi49.98 8,552.09
8,650.00
8,552.21
0.00
0.17
26.24
419.37
286.55
0006
0.51
0.53
0.51 Pass-NOERRORS
8.67465 9,57572
8,675.00
8,576.79
0.01
0.23
no
-42336
298.70
0000
3.18
1.71
3.10 Pass-NOERRORS
SAM 8.597.83
0,70000
9,80137
002
029
-33.06
-42738
300.94
0.000
833
263
0.33 Pass-NOERRORS
5721.36 8,617.95
8,72500
8,625.93
003
0.38
-4080
431.44
303.25
0 a
1570
359
1570 Pass - NOERRORS
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
81192017 10:45a0AM Page 2 COMPASS 5".1 Build 81D
BP
by T
• ravelling Cylinder Report BAKER
MAP fag
HUGHES
Company:
North America -ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 04
Site Error:
0.00 usft
Reference Well:
0438
Well Error:
0.00 usft
Reference Wellbore
04-38A
Reference Design:
04-38A WP08
Local Co-ordinate Reference:
ND Reference:
MO Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset ND Reference:
Well 04-38
Mean Sea Level
53: 38 8/21/1991 00:00 @ 53.00usft (generic
drilling rig)
True
Minimum Curvature
1.00 sigma
EDM RSK - Alaska PROD - ANCP1
Offset Datum
Offset Design
PB DS 04 - 04-38 - 04-38 - 04-38
Met She Error: 0.00 usft
Survey Program:
BO -GCT -MS
Rule Assigned; NOERRORS
OR»t Well Error. a0D 9sfl
Reference
Olhe
Semi Major Aals
Measured
VMmal
Measured
Vertical
Reference Ouse
Tooda.
meet Welnere CeBrc
Casing-
Centra to
No"
Allowable
Depth
Deprb
Depth
Depth
AHmuth
MLS
eEl-W
Hole Size
Centre
Distance
Wamin9
Oayiatlon
(.sit)
(usm
luso)
(.an)
4 -Aft) (undo
fl
IusXl
lusnl
(in)
lusnl
lusnl
lusnl
8,742.%
863560
s7e)00
0,650.47
065
043
46.88
43501
30557
0.000
25.27
Ido
2527 Pass -NOERRORS
8.763.50
a652 07
8775.00
6,674%
0.08
0.50
816]
43985
307Q
0.000
3692
534
38.92 Pass-NOERRORS
8.779.57
%663.78
8,800.00
8,89951
0.12
0.57
-54.22
-444.10
31035
0000
50.31
5.97
5031 Pass-NOERRORS
8795.35
8.674.48
%825.00
8,724.02
0.17
065
-56.71
448.38
31270
0,000
85.33
658
65)3 Pass -NOERRORS
8.8011
8,683.32
8,850.00
8,748.52
023
0.73
-5870
'452.69
31522
0.000
81.70
7.07
81.70 Pass - NOERRORS
8102200
8,690.80
%875.00
9,77102
0.29
060
-6033
457.04
317.71
0600
99.18
749
99.18 Pass - NOERRORS
8,833.24
8,6%60
8,900.00
8,79749
035
0.08
8170
-461.47
32020
0600
117.57
785
117.57 Pass -NOERRORS
8,83850
8.69924
8,925.00
8.02194
0.38
0.98
62M
-065.98
322.83
0.000
136.88
8.02
138.88 Pass -NOERRORS
%852.27
8,705.62
a850.00
8,&038
0.47
164
-6382
-47055
325.41
0000
150.60
042
15660 Pass -NOERRORS
s.%3.50
8.710.25
8.97560
8,870.83
054
1.07
-64.%
47513
32798
Dow
177.12
872
177.12 Pass-NOERRORS
8.%3.%
8,710.25
9,00060
6,895.27
0.54
1.12
8543
479.73
330.50
DOW
198.12
872
198.12 Pass -NOERRORS
%87403
8714.10
9,025.00
8.919.71
0.62
1.18
%30
.48432
33305
0000
21945
899
21945 Pass-NOERRORS
8,879.91
8.716 Do
9,050.00
8,944.16
0.66
1.23
66.91
.48891
33559
0600
24122
913
24122 Paas-NOERRORS
8,808.%
8,71061
9,075.00
0.9%.60
073
1.28
87.61
493.50
330.13
0.000
28136
932
28338 Pass- NOEIRORS, CC, ES. SI
%88850
8,71961
91100.00
8199304
0.73
134
b797
490.09
34068
0.000
28570
9.32
285.70 Pass-NOERRORS
8,088.50
8,71861
9,10560
8,997.93
073
1.35
-67.92
-499.01
341.18
0.000
290.22
8.32
29022 Pass-NOERRORS
CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
61192017 10:45: FOAM Page 3 COMPASS 5000.1 Build 61D
r by
BP
Travelling Cylinder Report
ri.2
BAKER
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 04-38
Project:
Prudhoe Bay
NO Reference:
Mean Sea Level
Reference Site:
PB DS 04
MD Reference:
53 : 38 8/21/1991 00:00 @ 53.00usft (generic
drilling rig)
Site Error:
0.00 usft
North Reference:
True
Reference Well:
0438
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00 usft
Output errors are at
1.00 sigma
Reference Wellbore
04-38A
Database:
EDM R5K-Alaska PROD -ANCP1
Reference Design:
04-38A WP08
Offset ND Reference:
Offset Datum
reference Depths are relative to 53: 38 821/1991 00:00 @ 53.00usft ( Coordinates are relative to: 04-38
)ffset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK /
lentral Meridian is 150° 0' 0.000 W Grid Convergence at Surface is: 1.62'
S
Ladder Plot
L
- ----
--- -,----
I
I
I
I
I
i
I
_ J
I
I 1
I I
I I
I '
' � I
1500 3000 4500 6000 7500 9000
Measured Depth
-+- 04-38,04,38,04-38V1
LEGEND
CC -Min centre to center distance or covergent point, SF -min separation factor, ES - min ellipse separation
6/19/201710.45:10AM Page 4 COMPASS 5000.1 Build SID
t)bp
BP EARN
N Travelling Cylinder Report RAM
NUGNES
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 04-38
Project:
Prudhoe Bay
ND Reference:
Mean Sea Level
Reference Site:
PB DS 04
MD Reference:
53: 38 8/21/1991 00:00 (03 53.00usft (generic
drilling rig)
Site Error:
0.00 usft
North Reference:
True
Reference Well:
0438
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00 usft
Output errors are at
1.00 sigma
Reference Wellbore
04-38A
Database:
EDM RSK- Alaska PROD -ANCP1
Reference Design:
04-38A WPOB
Offset ND Reference:
Offset Datum
Reference Depths are relative to 53: 38 8/21/1991 00:00 @ 53.00usft ( Coordinates are relative to: 04-38
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27.OGP-Usa AK /
Central Meridian is 150" 0'0.000 W Grid Convergence at Surface is: 1.62 °
Separation Factor
Plot
9.00
i
------------- i_____________i_____________i ____________1i_
I
O i
m
6.00-
0
.00
0
o �
i
m
G _____ ------------ __________
--
3.00—
L
i
0.00
0 2000 4000 6000 8000
Measued Depth
LEGEND
—9— 04-38,134-38,04-38\11
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
671912017 1045: 10AM Page 5 COMPASS 5000.1 Build 81D
'f ♦BP
,�..
Zby Travelling Cylinder Report BAKER
ee S
HUGHES
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 04
Site Error:
0.00 usft
Reference Well:
0438
Well Error:
0.00 usft
Reference Wellbore
04-38A
Reference Design:
04-38A WP08
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 0438
Mean Sea Level
53 : 38 8/21/1991 00:00 @ 53.00usft (generic
drilling dg)
True
Minimum Curvature
1.00 sigma
EDM R5K-Alaska PROD -ANCP1
Offset Datum
teference Depths are relative to 53 : 38 8/21/1991 00:00 @ 53.00usft ( Coordinates are relative to. 04-38
Jftset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27.OGP-Usa AK /
]entral Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 1.62'
300
270
240
Travelling Cylinder_-
P- Pot
315 -_
330 30
/ 270 - A
223
180
,135
45
\ 90
180.
'— - 25
270
210 _-- 150
180
Azimuth from North['] vs Centre to Centre Separation [150 usft(in]
LEGEND
f 04-38.04-98,0438v1
ME
120
90,
CC - Min centre to center distance or oovergent point, SF - min separation factor, ES - min ellipse separation
611 912 01 7 10,45 10AM Page 6 COMPASS 5000.1 Build 81D
A��
f Z bps
"oot `
Project: Prudhoe Bay
Sire: PBDS04
Well: 0438
Wellbore: 043111
Plan: 0 M WP08 Plus 600R M D(0438N 38x11
a,n
p..ass.w'
Lnemxo':t�n
Mee.kFW
w O9�1�lR
oY/AI'
aoms�v
WELLBORE DETAILS: 043BA
nrs+Farawwawnou
0438A
�(K) Pehrnce MOOD Trus"'
Vs.pWlefveae. uas, 5®L"
PmeM Wellbore' 0438
Seem W)Rahn. Sat. 0 MR DAM
Ta.MD'. BS88.50
MewadDWnFehiace. 53390Rllf991W W®59AOn9(pm�s Aig
CakuhWn Lb" lane can.wn
FJam—
Fad
BAKER
-----.ES
Mean Sea Level
": bp"00#05
North America - ALASKA - BP
Prudhoe Bay
PB DS 04
04-38
04-38A
04-38A WP08 Plus 500ft MD
AOGCC Offset Well Report
19 June, 2017
riFag
BAKER
HUGHES
"00+0 b p
Company:
North America -ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 04
Site Error:
0.00usft
Reference Well:
0438
Well Error:
O.00usft
Reference Wellbore
04-38A
Reference Design:
04-38A WP08 Plus 50011 MD
BP FORM
Anticollision Report BAKFJt
NVGM
Local Co-ordinate Reference:
Well 04-38
TVD Reference:
Mean Sea Level
MD Reference:
53: 38 8/21/1991 00.00 @ 53.00usft (generic drilling rig)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Output errors are at
1.00 sigma
Database:
EDM R5K-Alaska PROD -ANCP1
Offset TVD Reference:
Offset Datum
Reference
04-38A WPO8 Plus 50011 MD
Filter type:
GLOBAL FILTER APPLIED: All welipaths within 200'+ 100/1000 of reference
WARNING: There is hidden tight data in this project
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 200.00usft Error Surface:
Elliptical Conic
Survey Tool Program Date 6/19/2017
From To
(usft) (usft) Survey (Wellbore) Tool Name Description
80.20 8,588.50 1 : Schlumberger GCT multishot (04-38) GCT -MS Schlumberger GCT multishot
8,588.50 10,671.53 04-38A WPOB Plus 500ft MID(04.38A)MWD MWD -Standard
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
PB DS 04
0408 - 04-08 - 04-08
3,378.84
3,375.00
154.50
04-09 - 0409 - 04-09
3,077.76
3,075.00
69.16
04-09-04-09PB1-04-09PB1
3,077.76
3,075.00
69.16
0410-04-10-04-10
2,649.13
2,650.00
76.94
04 -38 -04 -38A -04-38A WPO8
10,171.53
10,171.53
0.00
6/19/2017 1:38:28PM Page 2 of 24 COMPASS 5000.1 Build 81D
TRANSMITTAL LETTER CHECKLIST
WELL NAME: '2d '4_
PTD: 7,(:7 —&2�s_
/Development _ Service _ Exploratory _ Stratigraphic Test Non -Conventional
FIELD: POOL:
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. , API No. 50-
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name (_PH) and API number (50-
_-_) from records, data and logs acquired for well
name onpermit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first cau t and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing ro am.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 da s after com letion, sus ension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field 8 Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY _UNLT 04 38A - Program DEV - Well bore seg ❑ I
- — --
PTD#:2170980 Company BP EXPLORATION (ALASKA).INC._ __ Initial Class/Type DEV1_PEND GeoArea 890 Unit 11650 _ On/Off Shore On Annular Disposal ❑
Administration
17
18
1
19
2
3
4
21
5
6
7
23
8
9
10
Appr Date
11
12
SFD 6/30/2017
27
13
Date
14
VTL
15
29
16
Nonconven. gas conforms to A531,05.0300A.A).0.2.A-D)
Permit fee attached. - - -
Leasenumberappropriate - -
Unique well. name and number -
Well located in -a defined pool.
Well located proper distance from drilling unit. boundary
Well located proper distance from other wells- -
Sufficient acreage available in drilling unit.
If deviated, is wellbore plat. included
Operator only affected party
Operator has appropriate bond in force
Permit can be issued without conservation order -
Permit can be issued without administrative approval
Can permit be approved before 15 -day wait...
Well located within area and strata authorized by Injection Order# (put 10# in. comments) (For
All wellswithin1/4 mile area of review identified (For service well only)
Pre -produced injector: duration of pre -production less than 3 months (For. service well only)
conductor Stringprovided
Surface casing protects all. known USDWs -
CMT vol adequate to circulate on conductor & surf csg
CMT vol adequate to tie-in long string to surf csg
CMT will cover all known productive horizons - -
Casing designs adequate for C, T, B & permafrost
Adequate tankage or reserve pit
If re -drill, has a 10-403 for abandonment been approved
Adequate wellbore separation proposed
If divener required, does it meet regulations
Drilling Fluid program schematic .& equip. list. adequate
BOPEs,.do they meet regulation
BOPE press rating appropriate; test to (put psig in comments)
Choke manifold complies w/API RP -53 (May 84)
Work will occur without operation shutdown
Is presence of H2S gas probable
Mechanical condition of wells within AOR verified (For service well only)
Permit can be issued w/o hydrogen sulfide measures
Data presented on potential overpressure zones
Seismic. analysis of shallow gas zones
Seabed condition survey (if off -shore)
Contact name/phone for weekly progress reports [exploratory only] -
NA
NA -
Yes
Yes
Yes
Yes
Yes-
Yes
Yes
Yes
Yes
Yes
Yes
Yes
NA
NA
NA
NA
NA
NA
NA
Yes
Yes
Yes
Yes
Yes
NA
Yes
Yes
Yes
Yes
Yes
Yes
NA
No
Yes
NA
NA
NA
Geologic Date: Engineering Date 7 Pu Icc Date
Commissioner: Commis of
Entire Well lies within ADL0028325.
PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341F
CO 341 F, Rule 2:. There shall be no restrictions as to well spacing. except that. no pay shall be - -
opened in a well closer than 500 feet to the boundary of the affected. area. Planned well conforms to CO
341 F, Rule 2.....
Conductor set for PBU 04-38
Surface casing set in PBU 04-38
Surface casing set and fully cemented
Productive. interval will be completed with cemented liner and perforated
Rig has steel tanks; all waste. to approved disposal wells
PTD 191-112, Sundry 317-292
Anti -collision analysis complete; no major risk failures
Max formation. pressure is 3354 psig(7.3 ppg EMW); will drill w/ 8.4 ppg EMW
MPSP is 2474 psig; will test BOPS to 3500 psig
H2S measures required
DS 04 wells are 1-12S -bearing. H2S measures. are required.
Planned drilling mud program (about 8.4 ppg) appears adequate to control operator's forecast
pore pressure. gradient (about 7.3 ppg). Should higher pore pressures be encountered,
BP has immediate access to nearby fluid. mixing facilities.
18
Engineering
19
20
21
22
23
24
25
26
27
Appr
Date
28
VTL
7/7/2017
29
30
31
32
33
34
35
Geology
36
Appr
Date
37
SFD
6/30/2017
38
39
Nonconven. gas conforms to A531,05.0300A.A).0.2.A-D)
Permit fee attached. - - -
Leasenumberappropriate - -
Unique well. name and number -
Well located in -a defined pool.
Well located proper distance from drilling unit. boundary
Well located proper distance from other wells- -
Sufficient acreage available in drilling unit.
If deviated, is wellbore plat. included
Operator only affected party
Operator has appropriate bond in force
Permit can be issued without conservation order -
Permit can be issued without administrative approval
Can permit be approved before 15 -day wait...
Well located within area and strata authorized by Injection Order# (put 10# in. comments) (For
All wellswithin1/4 mile area of review identified (For service well only)
Pre -produced injector: duration of pre -production less than 3 months (For. service well only)
conductor Stringprovided
Surface casing protects all. known USDWs -
CMT vol adequate to circulate on conductor & surf csg
CMT vol adequate to tie-in long string to surf csg
CMT will cover all known productive horizons - -
Casing designs adequate for C, T, B & permafrost
Adequate tankage or reserve pit
If re -drill, has a 10-403 for abandonment been approved
Adequate wellbore separation proposed
If divener required, does it meet regulations
Drilling Fluid program schematic .& equip. list. adequate
BOPEs,.do they meet regulation
BOPE press rating appropriate; test to (put psig in comments)
Choke manifold complies w/API RP -53 (May 84)
Work will occur without operation shutdown
Is presence of H2S gas probable
Mechanical condition of wells within AOR verified (For service well only)
Permit can be issued w/o hydrogen sulfide measures
Data presented on potential overpressure zones
Seismic. analysis of shallow gas zones
Seabed condition survey (if off -shore)
Contact name/phone for weekly progress reports [exploratory only] -
NA
NA -
Yes
Yes
Yes
Yes
Yes-
Yes
Yes
Yes
Yes
Yes
Yes
Yes
NA
NA
NA
NA
NA
NA
NA
Yes
Yes
Yes
Yes
Yes
NA
Yes
Yes
Yes
Yes
Yes
Yes
NA
No
Yes
NA
NA
NA
Geologic Date: Engineering Date 7 Pu Icc Date
Commissioner: Commis of
Entire Well lies within ADL0028325.
PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341F
CO 341 F, Rule 2:. There shall be no restrictions as to well spacing. except that. no pay shall be - -
opened in a well closer than 500 feet to the boundary of the affected. area. Planned well conforms to CO
341 F, Rule 2.....
Conductor set for PBU 04-38
Surface casing set in PBU 04-38
Surface casing set and fully cemented
Productive. interval will be completed with cemented liner and perforated
Rig has steel tanks; all waste. to approved disposal wells
PTD 191-112, Sundry 317-292
Anti -collision analysis complete; no major risk failures
Max formation. pressure is 3354 psig(7.3 ppg EMW); will drill w/ 8.4 ppg EMW
MPSP is 2474 psig; will test BOPS to 3500 psig
H2S measures required
DS 04 wells are 1-12S -bearing. H2S measures. are required.
Planned drilling mud program (about 8.4 ppg) appears adequate to control operator's forecast
pore pressure. gradient (about 7.3 ppg). Should higher pore pressures be encountered,
BP has immediate access to nearby fluid. mixing facilities.