Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout217-098STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS RECEIVE® 1. Operations Performed'Luli Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Opera' n dow ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ ChanA ry ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Nitrite Squeeze Trial 0 1-12S Inhibition 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ S. Permit to Drill Number. 217-098 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 1 Stratigraphic ❑ Service ❑ 1 6. API Number: 50-029-22210-01-00 7. Property Designation (Lease Number): ADL 028325 8. Well Name and Number: PBU 04.38A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 10069 feet Plugs measured None feet true vertical 8722 feet Junkmeasuretl 8762 feet Effective Depth: measured 9992 feet Packer measured 5354, 6575 feet true vertical 8741 feet Packer true vertical 5353, 6572 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 78 20" 34-112 34-112 1490 470 Surface 3460 10-3/4" 34-3494 34-3493 3580 2090 Intermediate 8500 7-5/8" 31-8531 31-8488 6890 4790 Scab Liner 3205 5-1/2" x 3-1/2" 5418-8623 5416-8579 7740/10160 6280 / 10530 Liner 410 5-1/2" 8213-8623 8176-8579 7740 6280 Liner 1500 2-3/8" 8526-10026 8483-8733 11199 11776 Perforation Depth: Measured depth: 8940-9708 feet True vertical depth: 8784-8794 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# x 3-1/2" 9.3#, 13Cr80 31 -6630 31 -6627 4-1/2" Baker SABL-3 Packer 5354 5353 Packers and SSSV (type, measured and 3-1/2" Baker SABL-3 Packer 6575 6572 two vertical depth) 4-1/2" Carrico TRCF SCSSSV 2170 2170 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 227 4256 5124 1674 261 Subsequent to operation: 166 3816 4632 1619 259 14. Attachments: (required per 20 Mc 25.070.25.071, &25,283) 15. Well Class after work: Daily Report of Well Operations D Exploratory ❑ Development ❑ Service 0 Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319-409 Authorized Name: Sidoti, Todd Contact Name: Sidoti, Todd Authorized Title: Well Intervention Engineer Contact Email: Todd.Sidoti@bp.cem Authorized Signature: Date: I t Contact Phone: +1 907 564 5113 Form 10-404 Revised 04/2017 �/f I,,iI K4r-V-+L?��r7 3BDMS L4r^'NOV 2 2 2ot9 Submit Onginal Only Daily Report of Well Operations PBU 04-38A ACTI V ITYDATF m 111ARA A ev T/1/0=300/1400/240 Temp= Hot **Well flowing on arrival** (LRS Unit 76- Sodium Nitrite Treatment) Freeze protected FL with 3 bbls 60/40 and 85 bbls crude. Started down TBG with 5 bbls 60/40 10/25/2019 followed by 455 bbls of FW with Sodium Nitrite ***Continued on 10/26/2019 WSR*** ***Continued from 10/25/19*** (LRS unit 76 - Sodium Nitrite Treatment) Continued pumping 125 bbls of FW with sodium nitrite down TBG (580 bbls total) Over flushed TBG with 700 bbls 1% KCL. Freeze protected TBG with 40 bbls crude. RDMO. DSO notified of well status upon LRS departure. 10/26/2019 Swab, WV=Shut. SSV, MV, IA, OA=O en. AL=Shut. FWHP= 0/1160/30 WELLHEAD FMC ACRIATOR TYPE OKB. ELEV; 53 REF ELEV = 53' BF- BEV = 20.98' KOP= 7100' Max Angle = 105' @ 10043' Datum MD= N'A Datum TVD= 8800'SS 20- CONDUCTOR 91.51!, HdO, D =19.124" 1 1 u-3/4- CSG, 45.59, J-55, D = 9.953' 1—t_3494' Minimum ID = 1.781" @ 8534' R NIPPLE IN UP w/PTSA 4-112" TBG, 12.6#, 13CR-80 NSCT, 5405' .0152 bpf, D = 3.958' TOP OF 5-112' X 3-1/2' SCAB LNR --F6409' 11 LNR-SCAB, 9.2#, bpf, D = 2.992" 4-12" CAM TRCF SSSV NP, D = 3.812" LOGGED OUT (08125/08) GAS LFT MANDRD-S 3-12" TBG, 9.3#, 13CR-80 FOX, 6622' - TYPE .0087 bpf, D = 2.992' LATCH PORT DATE 6195' 5-12" SCAB LNR 170, NT80S NSCC .0232 bpf, D = 4.892' -KBMG -KBMG LNR-SCAB, 9.2#, bpf, D = 2.992" 4-12" CAM TRCF SSSV NP, D = 3.812" LOGGED OUT (08125/08) GAS LFT MANDRD-S 6346' 7-5/e' X 4-12' BKR SABL-3 I 5405' 4-12" X 3-12' XO. D = 2.81' (PLUG WILL BETIGHi) 5-1/2'X 3-12' BKR S-3 3-12" HES XN NP MLLE D = 2.87' 8526' -13-12' KB LTPw/N. SOLUTIONS PISA NP @ 8534', D = 1.781' (1028117) s.875" 8631' 8532' 2.70' SEALBORE DEPLOY SLV, D=225 MILLOUT WINDOW (04-38A) 8623'-8632' PERFORATION SLAM f?f DATE REV BY COMMENTS TYPE VLV LATCH PORT DATE ffl�370(0 MW799 Opn/Sgz -KBMG -KBMG DOME SO BK BK i6 24 04/24/17 05/20/18 6346' 7-5/e' X 4-12' BKR SABL-3 I 5405' 4-12" X 3-12' XO. D = 2.81' (PLUG WILL BETIGHi) 5-1/2'X 3-12' BKR S-3 3-12" HES XN NP MLLE D = 2.87' 8526' -13-12' KB LTPw/N. SOLUTIONS PISA NP @ 8534', D = 1.781' (1028117) s.875" 8631' 8532' 2.70' SEALBORE DEPLOY SLV, D=225 MILLOUT WINDOW (04-38A) 8623'-8632' 9103' W 1 9762' 1 PBTD 9992 2-3/8' LNR 4.7#, 13CR-85 TH511, .0039 bpf, D = 1.995' DATE PERFORATION SLAM f?f DATE REV BY COMMENTS REF LOG: B" ON 10/15/17 ORIGINAL COMPLETION ANGLEAT TOP PERF: 79° @ 8940' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz SHOT SOZ 1.56" 6 8940-9075 O 10/21/17 11/01/17 1.56" 6 9110-9295 O 10/21/17 1.56" 6 9345-9375 O 10/21/17 1-56" 6 94240-9535 O 10/21/17 1.56" 6 9603-9708 O 10/21/17 9103' W 1 9762' 1 PBTD 9992 2-3/8' LNR 4.7#, 13CR-85 TH511, .0039 bpf, D = 1.995' DATE REV BY COMMENTS DATE REV BY COMMENTS 09/06191 ORIGINAL COMPLETION 11/07/17 MGS/JMC SET LTP w/PTSA & R NP 02108/95 D46 RWO (SCAB LNR) 11/07/17 BSEJJMD GLV C/O (11/04/17) 0327195 D46 RWO 11/07/17 JNL/JMD ADDED REF & BF ELEV 1022M7 N-CDR2 CTD (04-38A) 0523/18 JPK/JMD GLV C/O (0520/18) 11/01/17 JMD DRLG HO CORRECTIONS 11/18119 DD/JMD ADDED CONDUCTOR NFO 11/01/17 SM/JMD FINAL ODE APPROVAL PRUDHOE BAY UNIT WELL 04-38A PERMIT No: 217-098 API No: '500292221001 SEC 27, T11N, R15E, 383' FSL & 65 BP Exploration (Alaska) THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Todd Sidoti Well Intervention Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 04-38A Permit to Drill Number: 217-098 Sundry Number: 319-409 Dear Mr. Sidoti: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 w .aogcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 24si6eL.hmielowski Commissioner DATED this I � day of September, 2019. 3BDMS I�" SEP 12 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS ?n AAr 99 osn rsCULIVE® SEP 0 9 2019 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ OperatiQ�S^tl� ❑ ChangF Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Approv ❑ Plugfor Redrill Other Nitrite Squeeze Trial ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ (H2S Inhibition) 2. Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development 0 . 5. Permit to Drill Number 217498 3, Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stretigraphic ❑ Service ❑ 6_ API Number: 50-029-22210-01-00 ' 7. If perforating: What Regulation or Conservation Order governs well spacing in this pool? 8. Well Name and Number. Will planned perforations require a spacing exception? Yes ❑ No 0 PBU 04.38A 9. Property Designation (Lease Number): 10. Field/Pools. ADL 028325 • PRUDHOE BAY. PRUDHOE OIL ' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(a): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 10069 8722 9992 8741 None 8762 Casing Length Size MD Ti Burst Collapse Conductor 7820" 34-112 34-112 1490 470 Surface 3460 10-3/4" 34-3494 34-3493 3580 2090 Intermediate 8500 7-5/8" 31-8531 31 - 8488 6890 4790 Scab Liner 3205 5-1/2" x 3-1/2" 5418-8623 5416-8579 7740 / 10160 6280 / 10530 Liner 410 5-1/2" 8213-8 3 1 8176-8579 7740 6280 Liner 1500 2-3/8" 8526-10026 1 8483-8733 11199 11776 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 8940 - 9708 8784 - 8794 4-1/2" 12.6# x 3-1/2" 9.3# 13Cr80 31 -6630 Packers and SSSV Type: 4-1/2" Baker SABL-3 Packer Packets and SSSV MD (ft) and TVD (ft)' 5354 / 5353 3-1/2" Baker SABL-3 Packer 6575/6572 4-1/2" Camco TRCF SCSSSV 2170 12170 12. Attachments: Proposal Summary El Wellbore Schematic Ej 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigrephic ❑ Development EI - Service ❑ 14. Estimated Date for Commencing Operations: 9/27/2019 15, Well Status after proposed work: Oil El. WINJ ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Sitloti, Totltl be deviated from without prior written approval. Authorized Name: Sitloti, Totltl Contact Email: Todd.Sidoti00bp.cem Contact Phone: +1 907 564 5113 Authorized Title: Well Intervention E igineer Authorized Signature: Date: r COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number. L/D Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: �3BDMS 6 -/SEP 12 2019 Post Initial Injection MIT Req'd? Yes No ❑/. Spacing Exception Required? Yes ❑ No Gd Subsequent Form Required: 16 -46 J APPROVED BYTHE Approved by: �/ COMMISSIONER COMMISSION Date: ORIGINAL Form 10403 Revised D4/2017 Approved application is valid for 12 months from the date of approval. ubmi[ Form and Attachments in Duplicate 10-403 Sundry Application for Well PBU 04-38A PTD #217-098 Expected Start Date: September 27, 2019 Current condition of well: Gas Lift Producer, Operable, Online: Oil Rate: 141 bopd Gas Rate: 5143 Mscf/Da Water Rate: 7196 bw d Flowing Tubing Pressure: 279 psi Shut-in Wellhead Pressure: 300 psi Reservoir Pressure: 3304 psi Program Objective(s): 04-38A has relatively high H2S (300-625 ppm range) as do several others at DS -4. To better understand how to economically manage this risk over the long term, we are trialing an H2S inhibitor treatment known as a Sodium Nitrite Squeeze. Over the past year, several high-H2S wells in GPB were monitored. 04-38A was selected for the Nitrite Squeeze trial due to its elevated and consistent H2S levels in addition to its good on-time. Should this inexpensive treatment prove effective at reducing H2S levels in individual producers, GPB will have a potential option for safely producing high H2S wells in the event that they continue to increase or if individual facilities reach emission limits in the future. Continued monitoring of H2S levels following this treatment is critical to evaluating the effectiveness of the Nitrite Squeeze, these details are outlined in the Pumping and Monitoring Requirements tables. Proposed Program: 1. Perform TIFL 2. Pump Nitrite Squeeze (See Pumping Details Table) 3. Monitor Results (See Monitoring Details Table) BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 10-403 Sundry Application for Well PBU 04-38A PTD 6217-098 Pumping Details: Wei 04-38A Work Desc Write Squeeze APE CAPSU Date 0710&19 En kleer MeredYth Richards Phone 907 564-4867 H2S Value 300 112S Date rl 5/302019 sodium nitrite into reservoir for short-term reduction of HS produced from well. ie design for 04-38A will use 1000 ppm of sodium nnnte (100 lbs dry salt in sacks per 290 bbl rck of hot water). A 580 bbl treatment will be planned to make maximum use of one truck. ie 747 barrel 2% KCI overflush and freeze protect cap was sized to push the treatment 4' to into the formation assuming 250' to 550' of perforations take fluid. Pumping pressures ould be limited to avoid exceeding the frac gradient or 5 bpm. Shut in for a standard 12- iur soak to avoid more than one day of lost production. Pump Schedule State Fluid Type Pum Into Vol bbls Rate m Max Pres S ar Methanol! Water TBG 5 5 1200 Load Sodium Ndrde TBG 580 5 1200 Over -Flush 1% KCI TBG 707 5 1200 Freeze Protect Methanol l Water TBG 40 5 1200 1. Pump nitrite treatment per schedule 2. Do not exceed 1200 psi treating pressure once fluid is caught. Directions When filling out the pumping templateplease note the following MIT x1 TestType Tar et Pressure Mex Applied Pressure Test Fluid Inter Lints Confsmed ❑ MIT*3 Test Type Target Pressure Max Applied Pressure Test Fluid Integrity Lends Confirmed ❑ If "MIT" is selected as a stage. the corresponding MIT section must be filed out. The boxes are defined as follows'. Test Type: Type of test to be performed (MIT -T, MIT -IA, MIT -OA. etc) Target Pressure: This is the requested Mll test pressure (M MIT -T to 2500 psi) Max Applied Pressure This m the max pressure that can be applied in order to achieve a passing MIT of the target test pressure, typically 10% greater than target pressure. BP practice 100218 (1045) requires that the test pressure must remain above or equal to the target pressure during the snore test evaluation period This pressure must not exceed the lowest rated working pressure (taking into account corrosion, erosion, etc) of any well banter element in the wren barrier envelope Test Fluid: The fluid to be used for the test. Integrity Limits Confimted: By checking this box, you have confirmed that the -Max Applied pressure' requested is within the limits of the wells Well Barrier Envelope' BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 10-403 Sundry Application for Well PBU 04-38A PTD #217-098 Monitoring Details: Monitoring This is an important trial, and the data from pre and posttreatment are critical to understanding the value. Monitoring should include: Analyte Location frequency By Who Purpose Once week before, Production Test separator Daily 7 days after, Drill Site Operator Monitor production and Monthlyafter enable sampling Weekly 4 weeks pre. 112S Wellhead Twice daily 7 daysafter, GPB Lab Definition of success Weekly 4 weeks afte r, Monthly yearafter Residual nitrte, Once week before, Understand flowback nitrate, sulfate, sulfide Test Separator Twice daily 7 daysaRer GPB Lab characteristics Elemental sulfur Once week before, confirm corrosion analysis Test Separator Twice daily 7 daysafter GPB Lab assumptions Once week before, PH Test Separator GPB Lab Confirm corrosion Twice daily 7daysafter assumptions Once week before, Total iron Test Separator GPB Lab Confirm mechanism Twice daily 7 days afte r SRB, SRA, total Once week before, GPB Lab sent to prokaryotes Wellhead Weekly imonth after Westport for gPCR Confirm mechanism Total organisms Wellhead Once week before, Nalco Champion PC Confirm mechanism Weekly 1 month after using ATP Corrosion monitoring Corrosion rate We If L ine Month before and after 1by ER probe in well Confirm corrosion line assumptions BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 10-403 Sundry Application for Well PBU 04-38A PTD #217-098 Wellbore Schematic: 3. 8.E11 53' 'BEY= 6Y F1EY = 20.96' °' _.__71ar 2D•(X7MXXTtxt 7 Argk � 105' � 10003' 1, _ Im MD= WA D= Im NO 8600 SS l 10-3/4- CSG. 45.61, F55. 0.9.95T -( _K Limum tD = 1,781"@ 8534' NIPPLE IN LTP WIPTSA 4 -VT nW. 12.61,13CR-80 ISCT, ps 0152 1p1, 13= 3,958- FT 958•IS-tMx}1M 6G6LFR 6 W.1)= 2.992• 0232 bpl. 0.4 697 L -W.. 0 • 04-38A > 0SWr. �WWE�eN'ASC" 21527815276r 0 IA-KMGI so I Bx 1 24 I05M 63N• ]-sro•x4-In•BatsABLapatn•3w• S10$' 4-t2'%}12•X0.0=2.81• (RUG WLL BE TGM) WOi' -(]-516•X618 RI"LWt GkO=486' I/ 1 XN WMLLr9 TO tr2• wee, 0= 299'. _- 5� 1/Y % 0.1fY x0. D � 2 el• o-va Ne LIF* In JOLUTU i FBA 40 R w @ 8534', D = 1 781• (102417) GATE REV BY I I.00Br bpt, 0= 2.997 _ I7 SE7L71dw1P15A 6 RNP 111rOM6 ala RW0(9cAe Lfii) 11107111UsbiRC Civ tlO(11/0Y17) WrLll% 078 RYFO 11107!17 JN.IRA ADDU F6 fB30PA710N RY 05/23018 JROJkU GLV C10(052N18) REF LOG_ BW ON 1x15/17 �1Y01r17 SWR.0 FIALDDEAFFRUVAL ANOLEAT TOPf6S: 79' @ 8910' Nab: Rota b fRmAxion DB for wokalperr deb SQE s F M160VAL ()OrJSge'i SHOT SO2 _. �� 1.58• 8 8940-9075 1.56• 6 9110-9286 O ;1021117 O 1D21/17 1.56• 6 W45 - 9375 1.68• 8 9040-9536 O 1021117 O 1021/17 2NF NR. 41111JC 1.56' 6 9603 - 9706 0 11021/17 1 10009 bpf, 0 = 1995• ISI/71Ht 171, 17CR6D, 0232 bpf, D=4.892' 9103•1106• -F-M---] GATE REV BY I rhA7 REV BY CW.B41^ ®MMI 01111MAL COMPLCD011111071 I7 SE7L71dw1P15A 6 RNP 111rOM6 ala RW0(9cAe Lfii) 11107111UsbiRC Civ tlO(11/0Y17) WrLll% 078 RYFO 11107!17 JN.IRA ADDU F6 10'B7i7 MCDIQ CTDIW38A) 05/23018 JROJkU GLV C10(052N18) 11IOtr17 TNU DIiGHDCDf 37r1QN5 �1Y01r17 SWR.0 FIALDDEAFFRUVAL BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 1Ril. )hM BAY LR41 WBL043UA PEFUrM 217-096 ARN9: '500292221001 SEC27. T11K RISE 387 FSL 8655' FEL OPFaplwaeoa (Abeka) Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEn inee b .com> Sent: Saturday, May 5, 2018 7:30 AM To: AK, GWO Well Integrity Engineer;AK, OPS EOC Specialists;AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL;AK, OPS FS2 Field OTL;AK, OPS FS2 OSM;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL;G GPB FS2 Drillsites; Richards, Meredyth; Regg,James B (DOA) Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington, Aras J;Wallace, Chris D (DOA);AK, GWO Well Integrity Well Information Subject: UNDER EVALUATION: Producer 04-38 (PTD#2170980) Sustained inner annulus casing pressure above NOL All, Producer 04-38(PTD#2170980)was reported to have sustained inner annulus casing pressure above NOL after it was shut in due to a power outage at flow station#2 on 4/30/2018. The well failed a subsequent warm TIFL on 5/4/2018 indicating a potential loss of one or more well barriers. At this time the well is reclassified as Under Evaluation and is on the 28 day clock for diagnostics and repairs. Plan Forward: 1. Slickline: GLV change out 2. DHD: Warm TIFL 3. Well Integrity Engineer:Additional diagnostics as needed Please respond with any questions, Joshua Stephens r Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 WC) skew1 DATA SUBMITTAL COMPLIANCE REPORT 1/22/2018 Permit to Orill 2170980 Well Name/No. PRUDHOE BAY UNIT 04-38A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-22210-01-00 MD 10069 TVD 8722 Completion Date 10/22/2017 Completion Status 1-0I1- Current Status 1-0I1- UIC No REQUIRED INFORMATION / _—Mud Log No 1/ ,�/ Samples No V Directional Survey Yes✓ - DATA INFORMATION List of Logs Obtained: MWD / GR / RES (from Master Well Data/Logs) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OHI Type Med/Frmt Number Name Scale Media No Start Stop P CH Received Comments ED C 28760 Digital Data 8366 10069 11/1/2017 Electronic Data Set, Filename: 04- 38A_LW D_ FINAL_ FIELD_COMPOSITE_15OCT 2017_BHI_CTK.Ias ED C 28760 Digital Data 11/1/2017 Electronic File: 11584975.pdf ED C 28760 Digital Data 11/1/2017 Electronic File: Post_Run_03_11584975.pdf ED C 28760 Digital Data 1111/2017 Electronic File: PreRun_02_USR_11584975.pdf ED C 28760 Digital Data 11/1/2017 Electronic File: 04- 38A_GR_Res_150CT2017_MD_FINAL_FIELD_' BHI_CTK.cgm ED C 28760 Digital Data 11/1/2017 Electronic File: 04- 38A_GR_Res_150CT2017_TVDSS_FINAL_FIEL. D_BHI_CTK.cgm ED C 28760 Digital Data 11/1/2017 Electronic File: 04- Q 38A_GR_Res _15OCT2017_MD_FINAL_FIELD_ , BHI_CTK.pdf ED C 28760 Digital Data 11/1/2017 Electronic File: 04- p 38A_GR_Res 15OCT2017_TVDSS_FINAL_FIEL- 1 D_BHI_CTK.pdf ED C 28760 Digital Data 11/1/2017 Electronic File: 04-38A Final Survey Report.pdf• ED C 28760 Digital Data 11/1/2017 Electronic File: 04-38A Final Survey Report.txt . ED C 28760 Digital Data 11/1/2017 Electronic File: 04-38A Final Survey.csv ED C 28760 Digital Data 11/1/2017 Electronic File: 04-38A Final Survey.xlsx - ED C 28760 Digital Data 11/1/2017 Electronic File: 04- 38A_25_tapescan_131-1I_CTK.txt ED C 28760 Digital Data 11/1/2017 Electronic File: 04-38A_5_ tapescan_BHI_CTK.txt AOGCC Page 1 of 2 Monday, January 22, 2018 DATA SUBMITTAL COMPLIANCE REPORT 1/22/2018 Permit to Drill 2170980 Well Name/No. PRUDHOE BAY UNIT 04-38A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029.22210-01-00 MD 10069 TVD 8722 Completion Date 10/22/2017 Completion Status 1-0I1 Current Status 1 -OIL UIC No ED C 28760 Digital Data 11/1/2017 Electronic File: 04-38A_output.tap ED C 28760 Digital Data 11/1/2017 Electronic File: 04- 38A GR Res _150CT2017_MD_FINAL_FIELD— BHI_CTKtif ED C 28760 Digital Data 11/1/2017 Electronic File: 04- 38A GR Res_ 15OCT2017_TVDSS_FINAL_FIEL' D_BH I_CTK.tif Log C 28760 Log Header Scans 0 0 2170980 PRUDHOE BAY UNIT 04-38A LOG HEADERS Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report Production Test Information / NA Geologic Markers/Tops 9 COMPLIANCE HISTORY Completion Date: 10/22/2017 Release Date: 7/7/2017 Description Comments: Directional / Inclination Data 0 Mud Logs, Image Files, Digital Data Y16 Core Chips Y / Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files YY Core Photographs Y / Daily Operations Summary Cuttings Samples Y N Laboratory Analyses Y / Compliance Reviewed BL' V A0GC( c Date Comments Date: I / t_/ Pagc 2 01 2 Monday. January 22, 2018 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WEL( DMPLETION OR RECOMPLETION REPI1 AND LOG 0 at11-vLI v GV NOV 14 2017 la. Well Status: Oil El • Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1b.WellCCC 20AAC 25.105 20AAC25.110Development GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One • Exploratory ®Exploratory ❑ ISeNice ❑ St Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 10/222017 . 1 217-098 ' 3. Address: 7. Date Spudded 15. API Number: P.O. Box 196612 Anchorage, AK 99519-0612 10/11/2017 - 50-029-22210-01-00 4a. Location of Well (Govemmental Section): 8. Date TO Reached: 16. Well Name and Number: 10/14/2017 PBU 04-38A Surface: 383' FSL, 655' FEL, Sec 27, Tl IN, RISE, UM 9 Ref Elevations KB 53.00 17. Field/Pool(s): Top of Productive Interval: 94' FNL, 246' FEL, Sec. 34, Tl IN, RISE, UM GL 18.88 • BE 20.98 PRUDHOE BAY, PRUDHOE OIL ' 10. Plug Back Depth(MWI VD): 18. Property Designation: Total Depth: 837 FNL, 836 FEL, Sec. 34, TIIN, RISE, UM • 9992'18741' • ADL 028325 . 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 712164 • y- 5952237. Zone - ASP 4 .10069'/87221 • 70-039 TPI: x- 712585 y- 5951771 Zone - ASP 4 12. SSSV Depth (MD/TVD): 20 Thickness of Permafrost MDr VD Total Depth: x- 712020 y- 5951017 Zone - ASP 4 2170'12170' 1900' (Approx.) 5. Directional or Inclination Survey: Yes m (attached) No ❑ 13. Water Depth, if Offshore: 21. Re ddll/Lateral Top Wndow Submit electronic and printed information per 20 AAC 25.050 N/A (1t MSL) MD7ND: 8623'18579' . 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and panted logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record, Acronyms may be used. Attach a separate page if necessary MWD/GR/RES 23, CASING, LINER AND CEMENTING RECORD CASING WT. PERGRADE FT. SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-va 35' 113' 35' 113' 30" 11 yens AS 10-3/4" 45.5# J-55 34' 3495' 34' 3494' 13-1/2" 2910 cu ft AS 111,406m ft Class'G', 290 cu ft Class'G' 7-5/8" 29.7# L -Bo 32' 8532' 32' 8489' 9-7/8" 542 cu It MTC, 348 cu it Class'G' 5-1/2"x3-1/2" 17#/9.2# N7-80515418' 13cm 8623' 5417' 8579' Scab Liner 385 cu ft Class'G' 5-1/2" 17# 13C- 1 8213' 8623' 8175' 8579' 6-3/4" 189 cu It Class'G' 2-3/8" 4.7# 18Cr85 1 6526' 10026' 8483' 8733' 3-1/4" 70 sx Class'G' 24. Open to production or injection? Yes ® No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/fVD of Top and Bottom; Perforation Size and Number): GRADE DEPTH SET (MD) PACKER SET (MD/TV 4-12" 12.6# 13Cr80 6630' 5354'/5353- 1.56" Gun Diameter, 6 spf COMPLETION x 3-1/2"9.3# 13Cr80 6575'/ 6572' 26, ACID, FRACTURE, CEMENT SQUEEZE, ETC. 8940'-9075' 8784'-8794' DATE 9110'- 9295' 8795'- 8798' /2Z 2 Was hydraulic fracturing used during completion? Yes ❑ No 0 . Per 20 AAC 25.283 (i)(2) attach electronic and printed _ _�b 9345'- 9375' 8798'- 8797' { 9440'- 9535' 8795'- 8794' VERIFIED 9603'- 9708' 8797'-8794' L information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 9762' Fish: BOT Circulation Sub Motor Parabolic Mill 2555' Freeze Protect w/ 50 Bbis Diesel 27. PRODUCTION TEST Date First Pmduclion: November 6, 2017 Method of Operation (Flowing, gas lift, etc.): Gas Lift Date of Test: 11/8/17 Hours Tested Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Sive: Gas -Oil Ratio: 10 Test Period 1037 625 784 85 186D Flow Tubing 600 Press Casino Press: 1480 Calculated 24 Hour Rate �1 Oil -Bbl: 2488 Gas -MCF: 1500 Water -Bbl: 1881 Oil Grevily-API from: WA Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only VtL 11/1s//9' x (r1sl, RMTS L" NOV 1 2017, �ir-tT r7 a 28. CORE DATA Conventional Cores) Yes ❑ No IZ Sidewall Cores Yes ❑ No m i If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No 0 Permafrost- Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 8841 8744' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. CGL - Zone 3 8633' 8588' Base of CGL - Zone 2C 8673' 8626' 23 SB - Zone 2B 8735' 8678' 21TS - Zone 2A 8841' 8744' Zone 2B (Invert) 9882' 8767' Formation at total depth: Zone 2B (From Base) 9882' 8767' 31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post -Rig Work, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070, 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Browning, Zachary H Authorized Title: Inf a n and Dat ntroller Contact Email: Zachary.Browning@bp oom Authorized Signature: Date: 1 I {{. Contact Phone: +1 907 564 5220 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (fop of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean we level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex. 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29, Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and panted logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this forth: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Forth 10-407 Revised 512017 Submit ORIGINAL Only WB-LhEAD FMC AC IIATOR REF LOG: BH ON 10/15/17 OKE. ELEV = 53' RTF ELBE = 53' BF. ELEV = 2D.W KOP= 7100' Max Angle = 105° @ 10043' Datum MD= NA DatumTVD: Saw SS 20" 00NCl1Cf0t� Minimum ID = 1.781" @ 8534' R NIPPLE IN LTP w/PTSA 4-12' TBG, 12.6#, 13CR-80 NSCT, 5405' .0152 bpf, K)=3.958" TOPOF 5-12' X 11/2- SGB LNR —1 64W 11/2' TBG, 9.3#, 13CR40 FOX, 6622 .0087 bpf, D = 2.992' SGB LNR, 17#, NTSOS NSCC 8195 bpf, D = 4.892' TOPTOP OF 112' LNRSCAB, 9.2#,13CR-80 NSCT, H 8715' .0087 bpf, D = 2-992' 04-38A SAFETY NOTES: WELL ANGLE> 70" @ 8910. MAX C 12.9'0 8940'.—CFMQOMETBG, LNR & SCAB 2162' 4-1/2' CAM TRCF SSSV NP, D=3.817 LOCKED OUT (08/25/08) GAS LFT A4ANDRAS PE3 FORATION SLI MARY 09106191 ORIGINAL COMPLETION REF LOG: BH ON 10/15/17 02/08195 616 I&VO (SCAB L" ANGLEATTOPPERF: 790 @ 8940 Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL gxgSqz SHOT SOZ 1.56' 6 8940-9075 O 1021/17 1.56' 6 9110-9295 O 1021/17 DSO 1.56" 6 9345-9375 O 10121/17 1.56' 6 9440-9535 O 10121/17 1.56' 6 9603-9708 O 10121/17 04-38A SAFETY NOTES: WELL ANGLE> 70" @ 8910. MAX C 12.9'0 8940'.—CFMQOMETBG, LNR & SCAB 2162' 4-1/2' CAM TRCF SSSV NP, D=3.817 LOCKED OUT (08/25/08) GAS LFT A4ANDRAS 0, D = 3.94' 4-12 (PLGW1DT=)B2.81' 7-518' X 5-12' SLF+6 LNR HGP. D = 4.86' 656T—j5.12'X3-12'BKRS-3PeRV=2.82' 6600'3-12" i -ES XN NPMLLEDTO 2.80' (08/30/17) 3-12'WLEG, D=2.99' = 2.87' 8526' 11/2' KB LTPw/N. SOLUTIONS PISA NPO 8534', D= 1.781' (1028/77) 8632' 2.70' SFALBORE DEPLOY SLV, D=2.2! MLLOUT WINDOW (04-38A) 8623' - 8632' PBro LNR, 4.7#, 13CI bpf, D = 1.995' DATE REV BY I COM E]NTS DATE ROV BY COMIARM 09106191 ORIGINAL COMPLETION 11107117 MG&AC SET UP w /PISA & R NP 02/08195 616 I&VO (SCAB L" S2 03127195 616 AM 11/07/17 JNdIMD ADDED Tiff & BF B -EV 11822/17 H-COR2 CTO (04-38A) 11/01/17 JAD DRLG HD OORRMTIDN9 11/01117 SMNJM,D FNALODEAPPROVAL 52 B 5276 A-KBMG DSO I BKS 0 11/04/7 0, D = 3.94' 4-12 (PLGW1DT=)B2.81' 7-518' X 5-12' SLF+6 LNR HGP. D = 4.86' 656T—j5.12'X3-12'BKRS-3PeRV=2.82' 6600'3-12" i -ES XN NPMLLEDTO 2.80' (08/30/17) 3-12'WLEG, D=2.99' = 2.87' 8526' 11/2' KB LTPw/N. SOLUTIONS PISA NPO 8534', D= 1.781' (1028/77) 8632' 2.70' SFALBORE DEPLOY SLV, D=2.2! MLLOUT WINDOW (04-38A) 8623' - 8632' PBro LNR, 4.7#, 13CI bpf, D = 1.995' DATE REV BY I COM E]NTS DATE ROV BY COMIARM 09106191 ORIGINAL COMPLETION 11107117 MG&AC SET UP w /PISA & R NP 02/08195 616 I&VO (SCAB L" 11107117 &9E?JM1D GLV C10 (11/04/17) 03127195 616 AM 11/07/17 JNdIMD ADDED Tiff & BF B -EV 11822/17 H-COR2 CTO (04-38A) 11/01/17 JAD DRLG HD OORRMTIDN9 11/01117 SMNJM,D FNALODEAPPROVAL 9762' 1 I. H 10026' PRUDHOE BAY LUT WELL: 04-38A PERMIT No: 217-098 AM No: '500292221001 SEC 27, T1IR RI 5F 383' FSL & 655' FEL BP Btploration (AMsska) Common Well Name: 04-38 Event Type: RE -ENTER -ONSHORE (RON) Project: Prudhoe Bay Rig Name/No.: CDR -2 Rig Contractor: NABORSALASKA DRILLING IN Active datum: KB @53.00us6 (above Mean Sea Date From - To Hire (hr) 10/6/2017 03:00 - 06:30 3.50 North America - ALASKA - BP Page 1 of 9 Operation Summary Report AFE No Start Date: 10/8/2017 End Date: 10/15/2017 X3-018JR-C: (2,406,171.00) Site: PB DS 04 Task RIGU 06:30 - 11:30 5.00 RIGU 11:30 - 13: 1_ 00 1.50 RIGU Code NPT Total Depth Phase RIGU (usft) P PRE P PRE RIGU - - IN PRE BPUOI: USA00001143 Descnption of Operations REVIEW PROCEDURE AND CONDUCT PJSM WITH TRUCKING CREW AND NABORS CREW FOR MOVING RIG. - REVIEW USE OF 12X12 STOP BLOCK, STOP COMMAND AND GOOD RADIO COMMUNICATIONS. - PULL MUD MODULE AWAY AND STAGE AT ENTRANCE TO PAD. -PULL SUB AWAY FROM WELL.WSL WITNESSED, PAD OPERATOR WAIVED. - INSTALL JEEPS UNDER BOTH MODULES FOR ROAD TRAVEL. ;- PRE MOVE MEETING WITH SECURITY. - TOTAL MOVE DISTANCE APPROXIMATELY 24 'MILES. I MOVE RIG OFF OF PAD AND DOWN F PAD ACCESS ROAD. ,-MOVE RIG DOWN K PAD ROAD. STAGE UP IAT WEST DOCK JUNCTION. - ROAD CONDITIONS DICTATE SCARFING NEEDED TO MOVEAH_EAD SAFELY. WAIT ON LOADER TO COME OUT AND SCARF AHEAD OF THE RIG. - WEATHER CONDITIONS ARE SNOW WITH FRESH WET SNOW ON THE ROAD AND SOME ICE. 13:00 - 17:30 4.50 RIGU P PRE CONTINUE TO MOVE RIG TO DRILL SITE 04 ARRIVE LOCATION _ 17:30 - 21:00 3.50 RIGU } P PRE WSL VERIFIED CASING PRESSURES PER SOP REVIEW PROCEDURE AND CONDUCT PJSM WITH TRUCKING CREWAND NABORS CREW 21:00 - 00:00 3.00 RIGU 10/9/2017 00:00 - 01:30 1.50 RIGU 01:30 - 02:30 1.00 RIGU 02:30 - 03:30 1.00 RIGU 03:30 - 06:30 3.00 WHSUR Printed 11/6/2017 1:31:13PM *All depths reported in Drillers Depths' FOR MOVING RIG. - REVIEW USE OF 12X12 STOP BLOCK, STOP COMMAND AND GOOD RADIO COMMUNICATIONS. - SPOT SUB OVER WELL WITH WSL AND TP WITNESSING - SPOT MUD MODULE. SET DOWN ""RIG ACCEPTED 21:00— P PRE PJSM, DISCUSS FOLLOWING PROCESS OF RIG UP CHECKLIST. METHODICALLY START RIGGING RIG UP. PERFORM PRE -SPUD WITH COYNE / WARD CREWS P PRE CONTINUE WITH RU CHECKLISTS. N PRE HOOK UP TO PERFORM LTT. MASTER FAILING LTT. VERIFY LIQUID PACK ON TREE ATTEMPT LTT TEST AGAIN. FAIL. VERIFY SWAB HOLDING, P PRE GREASE CREWARRIVED. SERVICED TREE. PERFORMED LTTAGAINST MASTER/SWAB. PASSED. P PRE NIPPLE DOWN TREE CAP / NU MPD LINE PREP LUBRICATOR FOR TESTING Printed 11/6/2017 1:31:13PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 2 of 9 Common Well Name: 04-38 — — --- AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Data 10/8/2017 End Date: 10/15/2017 X3-018JR-C: (2,406,171.00) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Daterrime: 8/21/1991 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usR (above Mean Sea Level) Date From - To Hrs Task Cade NPT Total Depth Phase Description of Operations _ (hr) _ (ustt) 06:30 - 09:30 3.00 BOPSUR P PRE NIU 7 1/16"X 5M BOPE. - STACK CONFIGURATION AS FOLLOWS: TOP TO BOTTOM: 7 1/16" X 5M. -ANNULAR PREVENTOR, BLIND SHEARS, 2" PIPE SLIPS, MUD CROSS - 2 3/8" PIPE / SLIPS, 2 3/8" PIPE / SLIPS, MUD CROSS, BLIND SHEARS, 2" PIPE SLIPS. 09:30 - 12:00 2.50 RIGU P PRE MAKE UP NOZZLE, STAB ON WELL. - FLUID PACKAND PREPARE TO DISPLACE COIL. - DISPLACE COIL W/ 6.6 PPG 3% LUBE QUIKDRIL. 12:00 - 14:00 2.00 BOPSUR P PRE PREPARE TO TEST BOPE. -RIG UP EQUIPMENT, FLUID PACKAND LINE UP. - OPEN SWAB VALVE, PRESSURE UP TO 3500 PSI, (SHELLTEST). _ _- NOTIFYAOGCC OF IMPENDING TEST. _ 14:00 - 14:30 0.50 BOPSUR P PRE H2S/EVACUATION DRILL. (UNANNOUNCED) - HIGH ALARM SOUNDED, DRILL SITE OPERATOR NOTIFIED. -ALLHANDS MUSTEREDTO MUSTERAREA IN TIMELY MANNER. ,- LESS THAN (5) MINUTES TO MUSTER. -AAR. DISCUSSED GAPS. TRUCK DRIVER DID NOT HEAR ALARM. - TRUCK DRIVER WAS PICKED UP BY CREW DURING EVACUATION. - SITE CONTROL WILL MAKE ANNOUNCEMENTAND NOTIFY 3RD PARTIES. - (2) HANDS OPERATING MANLIFT DID HEAR ALARM AND RESPONDED CORRECTLY. - WIND DIRECTION NOTED. PAD SECURED. — GOOD DISCUSSION. 14:30 - 20:30 6.00 BOPSUR P PRE FUNCTION TEST GAS ALARMS. - COMMENCE BOPE TEST AS PER AOGCC AND BP REQUIREMENTS. - TEST BOPE TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MINUTES EACH - ALL TESTS CHARTED, SEE ATTACHED BOP TEST CHARTS - TEST WITNESSED BYAOGCC REP LOU LAUBENSTEIN - PERFORMED ACCUMULATOR DRAWDOWN. 2030 - 2200 1.50 1 BOPSUR P PRE -SWAP OUT LUBRICATOR. MEASURE 22:00 - 00:00 2.00 10/10/2017 00:00 - 01:00 1.00 ANNULAR TO RISER DISTANCE FOR RKB'S - PJSM, DISCUSS SIMOPS WHILE VALVE CREW CHECKS TORQUE ON TREE BOLTS. BOPSUR P PRE IRV/PACKOFF TEST/ LUBRICATOR - REVERSE CIRCULATE TO FLUID PACK STACK. - TEST TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MINUTES EACH - TEST C9/C10 BACKWARDS. BHI INSTALL FLOATS IN UQC WHILE TESTING - TEST TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MINUTES EACH - PERFORM VISUAL BODY TEST ON UQC RIGU P PRE PRESSURE TEST FLOATS IN UQC 703500#. GOOD TEST. Printed 1116/2017 1:31 13PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name. 04-38 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/8/2017 Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Date/Time: 8/21/1991 Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: KB @53.00usft (above Mean Sea Level) Date From - To Firs Task Code NPT (hr) 01:00 - 04:30 3.50 RIGU P End Date: 10/15/2017 Total Depth Phase (usft) PRE 04:30 - 05:45 1.25 RIGU P PRE 05:45 - 09:15 3.50 RIGU P PRE 09.15 - 11.15 2.00 RIGU P PRE V 15 - 12'.45 1 50 STWHIP P WEXIT Printed 11/6/2017 1:31 13PM 'All depths reported in Drillers Depths* Page 3 of 9 AFE No K3-018JR-C: (2,406,171.00) BPUOI: USA00001143 Description of Operations PJSM, PU BPV LUBRICATOR. EVACUATE MUD OUT OF STACK. MEASURE FOR EXTENSIONS TILT MAST TO CENTER UP. STAB BPV LUBRICATOR FILL STACK WITH METHANOL. PRESSURE TEST TO 3500# GOOD TEST. PRESSURE UP ON MASTER TO 1000#. OPENUP. PRESSURE FELL TOO# RIH AND LATCH VALVE. POOH. 0+ PRESSURE. LTT MASTER / SWAB VALVE TO 3500#. NO VISUAL FLOW FLUSH THROUGH LUBRICATOR TO TIGER TANK. BREAK LUBRICATOR OFF. ISA BPV RETREIVED. RIG UP FOR BULLHEAD WELL KILL. - MAKE UP TO WELL, TEST OTS / 3500 PSI, OK. - LINE UP TO BLEED ANNULI. _ PRE JOB SAFETY MEETING WITH ALL HANDS. - REVIEW PRESSURE CROSS CHECK LIST AND IDENTIFY MAXIMUM PRESSURES ON I/A AND CIA. - SET ALARMS AND TRIPS. VERIFY VALVE ALIGNMENT. - OPEN MASTER VALVE, SWAB IS CLOSED, LINE UPON MANAGED PRESSURE LINE. - PUMP (5) BBLS METHANOL AHEAD, FOLLOW WITH 275 BBLS 1% HEATED SLICK KCL. - INITIAL RATE = 5 BPM @ 2950 PSI. OBSERVE PRESSURE STEADILY DROPPING. - FOLLOW WITH (30) BBLS HI VIS PILLAND 120 BBLS 8.6 PPG DRILLING MUD. - FINAL CIRC PRESSURE, 5 BPM @ 2050 PSI. SHUT DOWN AND LET BLEED INTO FORMATION. - BLED DOWN TO 35 PSI AFTER 25 MIN. OPEN UP AND PUMP ACROSS THE TOP. - PUMP @ 1.77 BPM FOR 25 MINUTES, NO FLUID LOSTAND NONE GAINED. -OPEN UPAND PERFORM 10 MINUTE FLOW CHECK. WELL BORE STABLE, 8.6 PPG MUD IN AND OUT. PJSM. BREAK OFF INJECTOR. CLOSE MASTER VALVE - LAY DOWN LUBRICATOR, PICK UP BOP TEST LUBRICATOR SECTIONS. - PICK UP GREASED TEST JT, CLOSE RAMS FOR IMPRINT. - LAY DOWN TEST JT, LAY DOWN TEST LUBRICATOR SECTIONS. - PICK UP LUBRICATOR AND TEST BREAK PJSM. PICK UP WINDOW MILLING ASSEMBLY. - 2 3/8" EXTREME MOTOR, AKO SET @ .6 DEGREES - MAKE UP TO COIL, MAKE UP INJECTOR TO WELL. - TEST OTS @ 3500 PSI, OK. NO LOSSES TO WELL, WELL BORE STABLE. North America - ALASKA - BP Operation Summary Report Name: 04-38 Event Type: RE-ENTER- ONSHORE(RON) Start Date: 1018/2017 Project: Prudhoe Bay Site: PB -m-64 Rig Name/No.: CDR -2 Spud DateRme: 8/21/1991 Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: KB @53.00usft (above Mean Sea Level) End Date: 10/15/2017 Page 4 of 9 AFE No X3-018JR-C'. (2,406,171.00 ) Rig Release: BPU0I: USA00001143 Date From - To Hrs Task Code NPT Total Depth Phase Description or Operations (hr) (usft)___ -.-_ 12:45 - 1500 2.25 STWHIP P ---_— WEXIT RIH W/ WINDOW MILLING BHA. _ - EDC OPEN, PUMPING MINIMUM RATE. 15:00 - 15:15 0.25 STWHIP P 8,554.00 WEXIT LOG TIE IN W./ GAMMA, F/8460'-8554'@10 FPM. _ - MINUS 27' CORRECTION. 15:15 - 15:30 0.25 STWHIP P 8,623.00 WEXIT CONTINUE IN HOLE. - LIGHT TAG @ 8623'. - ESTABLISH PARAMETERS. 15:30 - 00:00 8.50 STWHIP P 8,627.50 WEXIT PUMPING 1.63 BPM IN / 1.63 BPM OUT @ 3370 PSI. - 38K UP WT, 26K D0WN Wt. -COMMENCE WINDOW MILLING OPERATION I @ 8622.7' - AFTER 1 FT ENGAGE AUTODRILL. MILL 2.80" WINDOW IN 3-1/2x5-1/2" CASING/LINER PER BAKER REP FROM 8,622.7' MD TO 8,627.5' MD - RATE: 1.70 BPM IN, 1.71 BPM OUT - MUD WEIGHT: 8.59 PPG IN, 8.61 PPG OUT -DW0B: 3-3.5 KLBS __ - CIRC PRESSURE: 3,500 PSI 10/112017 00:00 - 04:15 4.25 STWHIP P 8,628.00 ! WEXIT MILL 2.80"WINDOW IN 3-1/2x5-1/2" CASING/LINER PER BAKER REP FROM 8,627.5'MDTO8,628'MD - RATE: 1.70 BPM IN, 1.71 BPM OUT - MUD WEIGHT: 8.59 PPG IN, 8.61 PPG OUT -DW0B: 3-3.6 KLBS HS TF - CIRC PRESSURE: 3,500 PSI SLOWING ROP AS WOB / MTR WORK DICTATE. - LOSS RATE NOT MORE THAN 1/2 BPH. 04:15 - 0600 1.75 STWHIP P 8,62820 WEXIT CONTINUE MILLING WINDOWAS PRESCRIBED BY WELL PROGRAM AND BAKER HAND. - 1.66 BPM IN 11.66 BPM OUT @ 3475 PSI. WOB 3.SK ! -PUMPA S BBL L0 VIS/ S BBL HI VIS SWEEP _ AROUND @ 06:00._ 06:00 - 16:00 10.00 STWHIP P 6,628.20 WEXIT CONTINUE MILLING WINDOW, (ROP VERY SLOW) - SWEEP BACK, BEADS, CEMENT AND METAL. - 1.66 BPM IN 11 66 BPM OUT @ 3400 - 3450 PSI. - MAINTAINING HIGH SIDE TOOL FACE. - Q 09:00 STARTING TO SEE ROP PICKING UP. - @ 11:00 PUMP ANOTHER LO / HI VIS SWEEP, 15 BBLS EACH). -SWEEP BACK... S%SAND ... MAY BE i NOSING OUT. ^ WOB SLOWLY DROPPING OFF. 16:00 - 17:30 1.50 STWHIP P 8,642.00 WEXIT PUMP 5 BBLS LO / HI VIS SWEEPSAROUND. DRILL TO END OF RATHOLE AT 8,6421. CONDUCT FIRST UP PASS AT 1 FT/MIN, OL ORIENTATION. SLIGHT MOTOR WORK WEEN AT 8,628'. DOWN PASS AT OL, 1 FT/MIN NOTHING SEEN. UP PASS AT 15L, 1 FT/MIN, NOTHING SEEN, DOWN PASSAT OL, 1 FT/MIN NOTHING SEEN. UP PASS AT 15R, 1 FT/MIN, NOTHING SEEN. SAMPLE FROM END OF RATHOLE HAS 60% FORMATION. Printed 11/62017 1:31:13PM *All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Page 5 of 9 1 Common Well Name. 04-38 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/8/2017 End Date: 10/15/2017 X3-018JR-C: (2,406,171.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Date/Time: 8/21/1991 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usft (above Mean Sea Level) Date From - To Firs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 1730 - 1930 2.00 STWHIP P 8,64200 WEXIT DRY DRIFTAT OL ORIENTATION, 15 FT/MINIS CLEAN. TAG AT END OF RATHOLE. FLAG PIPE AND OPEN EDC. CONDUCT 10 -MIN DYNAMIC FLOW CHECK, STATIC. MONITOR WELL FOR 10 MINUTES: STATIC - MUD WEIGHT: 8.59 PPG IN, 8.61 PPG OUT - RATE: 2.10 BPM IN, 1.72 BPM OUT OPEN EDC, POH - RATE: 2.10 BPM. CIRC PRESSURE: 3,300 PSI 19:30 - 20.30 1.00 STWHIP P 8,642.00 WEXIT MONITOR WELLFOR 10 MINAT BHA -STATIC. OPEN CT RISER AND VISUALLY INSPECT 'LAST 50' OF CTABOVE CONNECTOR, NO . FLAT SPOTS SEEN. INJECTOR OFF THE WELLAT 20:05. MILLAND REAMER ARE 2.79" NO-GO. - LAY DOWN MILLING BHA. 2030 - 2145 r 1.25 DRILL P 8,842.00 PRODt MAKEUP 3.25" DRILLING BHA #2 - PICKUP 2-3/8" ULS MOTOR (2.2 DEG AKO) AND X"COILTRAK TOOLS - MAKE UP 2.80" X 3.25" HCC BICENTER BIT WITH P104 CUTTERS - SURFACE TESTED COILTRACK TOOL. GOOD TEST. - PRESSURE TEST QTS TO 3,500 PSI HIGH FOR 5 MINUTES _ -INJECTOR ON: 21:35 21:45 - 00:00 2.25 DRILL P 8,642.00 PROD1 RIH WITH 3.25" DRILLING BHA#2 - RATE: 0.49 BPM IN, 0.86 BPM OUT. CIRC PRESSURE: 1,210 PSI - MUD WEIGHT: 8.57 PPG IN, 8.61 PPG OUT - LOG DOWN FOR TIE-IN FROM 8,490' _ (FORMATION) WITH -14' CORRECTION 10/12/2017 00:00 - 0315 '. 3.25 DRILL P 8,738.00 PROD1 DRILL 3.25" BUILD FROM 8,642' MD TO 8,738' MD - FREE SPIN: 3,600 PSI, 1.68 BPM - RATE: 1.67 BPM IN, 1.62 BPM OUT. CIRC PRESSURE: 3,900 PSI - MUD WEIGHT: 8.59 PPG IN, 8.62 PPG OUT, ECD: 10.67 PPG (10.5 PPG AT WINDOW) - ROP: 20 - 40 FT/HR, WOB: 1 - 3 KLBS 0315 - 0515 2.00 DRILL P 8,738.00 PROD1 DRILL 3.25' BUILD FROM 8,738' MD TO 8,780' MD - FREE SPIN: 3,650 PSI, 1.67 BPM - RATE: 1.67 BPM IN, 1.60 BPM OUT. CIRC PRESSURE: 3,910 PSI - MUD WEIGHT: 8.60 PPG IN, 8.64 PPG OUT, ECD: 10.64 PPG (10.5 PPG AT WINDOW) - ROP: 10 - 40 FT/HR, WOB: 1 - 3 KLBS -AT 8,740' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. 105:15 - 12:15 7.00 DRILL P 6,738,00 PROW DRILL 3.25" BUILD FROM 8,780' MD 70 8,907' MD I - FREE SPIN: 3,800 PSI, 1.70 BPM - RATE: 1.70 BPM IN, 1.68 BPM OUT. CIRC PRESSURE: 3,910 PSI - MUD WEIGHT: 8.60 PPG IN, 8.64 PPG OUT, ECD: 10.64 PPG (10.5 PPG AT WINDOW) - ROP: 10 - 40 FT/HR, WOB: 1 - 3 KLBS Primed 11/6/2017 1:31:13PM 'All depths reported in Drillers Depths` North America -ALASKA - BP Operation Summary Report Common Well Name: 0438 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/8/2017 End Date: 10/15/2017 X3-018JR-C: Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud DateTme: 8/21/1991 12:00:OOAM Rig Release: (2,406,171 00 ) Page 6 of 9 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _— (hr)_ _(usft)—__-- 12:15 - 16:00 3.75 DRILL P 8,965.00 PROD1 DRILL 3.25' BUILD FROM 8,907'MD 7O 8,965' MD - FREE SPIN: 3,800 PSI, 1.70 BPM - RATE: 1.70 BPM IN, 1.66 BPM OUT. CIRC PRESSURE: 3,910 PSI - MUD WEIGHT: 8.60 PPG IN, 8.64 PPG OUT, ECD: 10.64 PPG (10.5 PPG AT WINDOW) -ROP: 10-30 FT/HR, WOB:1-3 KLBS PRESSURE CHOKE PLUGGING CFF, OFF, GO TO MANUAL CHOKE. II -UNPLUG MANAGED PRESSURE CHOKE I WHILE SHORT TRIPPING. -PUMPS BBLS LO/ HI VIS SWEEPS AROUND WHILE PULLING TO WINDOW. - PULL THROUGH WINDOW AND ,TROUBLESHOOT/CLEAR CHOKEAND OUT MM. 16:00 - 17:30 1.50 DRILL P 8,965.00 PROD1PERFORM LONG WIPER TRIP TO WINDOW FROM 8,965' MD - _ 1 __ _ _ _ _ _-_PULL THROUGH_ WINDOW AND OPEN EDC 17:30 - 18:00 0.50 DRILL P 8,965.00 PROD1 FINISH PUMPING BOTTOMS UP, RETURNS HAVE CLEANED UP. CHOKE PRESSURE IS STILL FLUCTUATING, TROUBLESHOOT. CONDUCT TIE-IN AT WINDOW RA, NO . CORRECTION. SHUT DOWN PUMP, TRAP 10.5 PPG AT WINDOW. RE -BOOT EXPRO CHOKE COMPUTER WHILE PUMP IS DOWN. 1800 - 19:00 1.00 DRILL P 8,965.00 PROD? CONDUCT PJSM FOR PURGING OUT MM WITH COMPRESSOR. LINE UP TO PURGE OUT MICROMOTION WITH COMPRESSOR. BREAK OFF WHIP SENSORS THAT RUN THE EXPRO AND INSPECT, THEY ARE CLEAN. 19:00 - 00:00 5.00 DRILL P 8,965.00 PRODi TRAP PRESSURE AND CLOSE EDC. RIH, PUMP 0.5 BPM KEEP AS DRILLED TF RUNNING DOWN THROUGH SHALES. DRILL 3.25' BUILD FROM 8,985' MD TO 9,150' MD - FREE SPIN: 3,800 PSI, 1.71 BPM - RATE: 1.71 BPM IN, 1.70 BPM OUT. CIRC PRESSURE: 4,000 PSI - MUD WEIGHT: 8.63 PPG IN, 8.66 PPG OUT, ECD: 10.70 PPG (10.5 PPG AT WINDOW) - ROP: 15 - 30 FT/HR, WOB: 2 - 3.8 KLBS - AT 9,020' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. AT 9,110' PULL 150' WIPER TRIP, CLEAN PASS UP AND DOWN. Printed 11/612017 1:31:13PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 7 of 9 Common Well Name: 04-38 APE No Event Type: RE-ENTER- ONSHORE (RON) Stan Date. 10/8/2017 End Date. 10/15/2017 X3-018JR-C: (2,406,171.00 ) Project: Prudhoe Bay Site: nibs 04 Rig Name/No.: CDR -2 Spud Date/rims: a/21/1991 12:00 OOAM Rig Release: Active datum: KB @53.00usft (abo Date From - To 10/13/2017 00:00 - 0330 Mean Sea Level) Has Task (hr) 3.50 DRILL BPUOI: USA00001143 Code NPT Total Depth Phase Description of Operations (usft) P 9,270.00 PROD1 DRILL 3.25" BUILD FROM 9,150' MD TO 9,270' 03:30 - 06:00 2.50 DRILL P 0600 - 0730 1.50 DRILL P 07:30 - 08:45 1.25 DRILL P MD - FREE SPIN: 3,800 PSI, 1.72 BPM - RATE: 1.72 BPM IN, 1.69 BPM OUT. CIRC PRESSURE: 4,050 PSI - MUD WEIGHT: 8.64 PPG IN, 8.69 PPG OUT, ECD: 10.68 PPG (10.5 PPG AT WINDOW) - ROP: 30 - 80 FT/HR, WOB: 2 - 3.8 KLBS AT 9,220' PUMP 10 BBLS LO / HI VIS SWEEPS AROUND. DRILL TO END OF BUILD AT 9,270'. (8745' _ TVD). 9,270.00 PROD1 PERFORM WIPER TRIP TO WINDOW FROM 9,270' MD !-RATE: 1.71 BPM IN, 1.51 BPM OUT. CIRC PRESSURE: 3,900 PSI -PULL THROUGH WINDOWAND OPEN EDC CIRCULATE 9.86 PPG MUD TO BIT AT 2.16 BPM / 4,200 PSI. - AFTER 9.8# MUD IS AT THE BIT, START POOH. MAINTAIN 10.5 PPG AT THE WINDOW WHILE POOH. _ 9,270.00 PROD? CONTINUE TO POOH. -FLOW CHECKAT SURFACE, WELL BORE STABLE. - 9.8 PPG MUD IN AND OUT. (1) BBLS LOST TO FORMATION ON TRIP OUT. 9,270.00 PROD1 BREAK OFF INJECTOR Q? 07:35 UD BUILD SECTION BHA. - GRADE BIT, 3 - 2 - BT - NOSE. - MAKE UP LATERAL BHA, ADJUST MOTOR TO 6 DEG AKO. MAKE P NEW P 104H HES BIT 12.30 - 1645 4.25 DRILL P 16'.45 - 17'.00 025 DRILL P - CHECK SHOT @ 8850', (JORPS) - RUN ON DOWN, SMOOTH TO BOTTOM. - TAG 4' HIGH Q, 9265'. 9,420.00 PROD1 DRILL 3.25" LATERAL FROM 9,265' MD TO 9420 'MD - FREE SPIN: 3,950 PSI, 1.70 BPM RATE: 1.68 BPM IN, 1.69 BPM OUT. CIRC PRESSURE: 4,225 PSI I - MUD WEIGHT: 8.77 PPG IN, 8.76 PPG OUT, ECD: 10.69 PPG (10.5 PPG AT WINDOW) - ROP: 50 - 120 FT/HR, WOB: 1 - 3 KLBS -UP WT -35K, DOWN WT 24K 9,420.00 PROD1 WIPER TRIP 7O 8950'. - 35K UP, 24K DOWN, 1.74 BPM IN, 1.71 BPM OUT -. 45 BPM & SMOOTH GOING BACK IN. Printed 11/6/2017 1 31 13PM *All depths reported in Drillers Depths" U - UG MAKE UP TO INJECTOR @ 08:40. 08'.45 - 10.45 2.00 DRILL P 9,270.00 PROD1 TEST OTS Q? 3500 PSI / 5 MIN / OK. - RIP! W1 LATERAL SECTION BHA. 10.45 - 10'.55 0.17 DRILL P 9,270.00 PROD1 LOG TIE IN W/ GAMMA F/8470'-8595' - LOG @ 3 FPM , MINUS 21' CORRECTION. -CLOSE EDC, RUN THRU WINDOW, SMOOTH 10.55 - 12'.30 1.58 DRILL P 9,270.00 PROD1 CONTINUE IN HOLE. 12.30 - 1645 4.25 DRILL P 16'.45 - 17'.00 025 DRILL P - CHECK SHOT @ 8850', (JORPS) - RUN ON DOWN, SMOOTH TO BOTTOM. - TAG 4' HIGH Q, 9265'. 9,420.00 PROD1 DRILL 3.25" LATERAL FROM 9,265' MD TO 9420 'MD - FREE SPIN: 3,950 PSI, 1.70 BPM RATE: 1.68 BPM IN, 1.69 BPM OUT. CIRC PRESSURE: 4,225 PSI I - MUD WEIGHT: 8.77 PPG IN, 8.76 PPG OUT, ECD: 10.69 PPG (10.5 PPG AT WINDOW) - ROP: 50 - 120 FT/HR, WOB: 1 - 3 KLBS -UP WT -35K, DOWN WT 24K 9,420.00 PROD1 WIPER TRIP 7O 8950'. - 35K UP, 24K DOWN, 1.74 BPM IN, 1.71 BPM OUT -. 45 BPM & SMOOTH GOING BACK IN. Printed 11/6/2017 1 31 13PM *All depths reported in Drillers Depths" North America - ALASKA - Bla Page 8 of 9 Operation Summary Report Common Well Name. 04-38 AFE No Event Type: RE -ENTER -ONSHORE IRON) Start Date: 101812017 End Date 10/15/2017 X3-018JR-C: (2,406,171.001 Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Date/Time: 8/21/1991 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) _. (usft) 17:00 - 21:20 4.33 DRILL . P 9,730.00 PROD? DRILL 3.25' LATERAL FROM 9,420' MD TO 9,730' MD - FREE SPIN: 4,050 PSI, 1.70 BPM - RATE: 1.69 BPM IN, 1.66 BPM OUT. CIRC I PRESSURE: 4,285 PSI - MUD WEIGHT: 8.69 PPG IN, 8.73 PPG OUT, ECD: 10.76 PPG (10.5 PPG AT WINDOW) -ROP: 80 - 120 FT/HR, WOB: i-3 KLBS -UP WT -35K, DOWN WT 24K -AT9,520'PUMP S BBLS LO/HI VIS SWEEPS. SWEEPS BRING BACK ABOUT 20% EXCESS CUTTINGS. - AT 9,570' PULL WIPER BACK TO 9,170'. CLEAN PASS UPAND DOWN, REDUCE PUMP 'RATE THROUGH SHALES. - AT 9,700' PUMP 10 BBLS LO / HI VIS SWEEPS. _ - DRILL TO 9,730'. 21:20 - 00:00 2.67 DRILL P 9,730.00 PROD1 PERFORM LONG WIPER TRIP TO WINDOW FROM 9,730' - RATE: 1.71 BPM IN, 1.53 BPM OUT. CIRC PRESSURE: 4,020 PSI - REDUCE RATE THROUGH SHALE ZONES - PULL THROUGH WINDOWAND OPEN EDC, PUMP 1 B/U WHILE TIE IN DEPTH. -CORRECT +0.5'. - CLOSE EDC, RIH. _ 10/14/2017 00.00 - 04:30 4.50 DRILL P 9,730.00 PROD1 DRILL 3.25"LATERAL FROM 9,730'MD TO 9,890' MD - FREE SPIN: 3,950 PSI, 1.71 BPM - RATE: 1.68 BPM IN, 1.63 BPM OUT. CIRC PRESSURE: 4,190 PSI - MUD WEIGHT: 8.72 PPG IN, 8.75 PPG OUT, ECD: 10.66 PPG (10.5 PPG AT WINDOW) - ROP: 50- 100 FT/HR, WOB: 1 - 3.6 KLBS - UP AT 35K, DOWN WT 24K -AT 9,820' PUMP 5 BBLS LO / HI VIS SWEEPS AROUND. - PAST 9,800' STARTING TO STRUGGLE WITH WEIGHT TRANSFER, INCREASE NXS-LUBE BY 0.25% TO BRING TOTAL LUBE CONCENTRATION TO 3.0%. - CONDUCT FREQUENT SHORT PICKUPS. 0430 - 0445 0.25 DRILL P 9,730.00 PROW WIPER TRIP FROM 9,890' TO 9,780'. - 34K UP, 20K DOWN, 1.75 BPM IN, 1.76 BPM OUT - CLEAN PASS UP AND DOWN. 0445 - 0600 1.25 DRILL P 9,730.00 PROD1 DRILL 3.25" LATERAL FROM 9,890'MD TO 9,985' MD - FREE SPIN: 4,000 PSI, 1.69 BPM - RATE: 1.69 BPM IN, 1.67 BPM OUT. CIRC PRESSURE: 4,220 PSI - MUD WEIGHT: 8.73 PPG IN, 8.80 PPG OUT, ECD: 10.74 PPG (10.5 PPG AT WINDOW) - ROP: 50 - 100 FT/HR, WOB: 1 - 3 KLBS Printed 1182017 1:31:13PM 'All depths reported in Drillers Depths' North America - ALASKA - SP Operation Summary Report Common Well Name: 04-38 - - -- - --- Event Type: RE-ENTER- ONSHORE (RON) Start Date: 10/6/2017 End Date. 10/15/2017 Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Datelrime: 8/21/1991 120000AM Active datum: KB @53.00usft (abc Date From - To 06:00 - 10:30 Mean Sea Level) Him Task Code (hr) 4.50 DRILL P 10'.30 - 17'.30 7.00 DRILL P 17:30 - 2200 4.50 2200 - 0000 2.00 DRILL P DRILL P Page 9 of 9 AFE No X3-018JR-G (2,406,171.00) Rig Release: BPUOI: USA00001143 NPT Total Depth Phase Description of Operations (usft) 10,069.00 PRODt DRILL 3.25' LATERAL FROM 9,985' MD TO 10,073' MD -FREE SPIN: 4,000 PSI, 1.89 BPM - RATE: 1.69 BPM IN, 1.67 BPM OUT. CIRC PRESSURE: 4,220 PSI - MUD WEIGHT: 8.73 PPG IN, 8.80 PPG OUT, ECD: 10.74 PPG (10.5 PPG AT WINDOW) - ROP: 50 - 100 FT/HR, WOB: 1 - 3 KLBS - TD CALLED BY TOWN GEOLOGIST. - PERFORM BREAKOVER EXERCISES (3). -W/ 24K SET DOWN, PICK UP TO BREAKOVER @ 30 FPM, (10') - W/ 15K SET DOWN, PICK UP TO BREAK OVER @ 30 FPM, (8') - W/ 10K SET DOWN, PICK UP TO BREAK OVER @ 30 FPM, (6'). - 22K DOWN WT, 32K UP WT. 8.8 PPG MUD, PUMPING 1.7 BPM @ 4000 PSI. 10,069.00 PROD1 WIPER TRIP TO THE SWAB VALVE. - W/ LO VIS / HIS VIS SWEEPAHEAD OF THE BIT. '- POOH TO WINDOW, OPEN EDC AND BRING ON PUMPS, MAX RATE. - 2.2 BPM, 4150 PSI, POOH @ 50 FPM. (2) JOGS THRU 5 1/2" SECTION. - LOSS RATE DURING THIS OPERATION, 1/2 BPH. - RBIH FROM SWAB. TIE IN W/ GAMMA, -14' CORRECTION. -THRU WINDOW, OK. CLOSE EDC INTO OPEN HOLE 25 FPM. - PUMPING 1.7 BPM, 1.83 BPM OUT, 3950 PSI, HOLDING AS DRILLED TOOL FACE. _- TAG AT 10,069' CORRECTED DRILLED To 10,069.00 PROD1 PICK UP SLOWLY, PUMP 10 BBLS HI -VIS SWEEP OUT, CONDUCT DYNAMIC FLOW CHECK NEAR BOTTOM, WELL IS STATIC. WIPER TRIP BACK TO WINDOW, CLEAN PASS. PUMP HIGH VIS PILL TO SURFACE AT 2.2 BPM / 4,230 PSI. RUN BACK TO BOTTOM, CLEAN PASS. LAY IN BEAD PILL WITH NEW MUD TO WINDOW. PULL THROUGH WINDOWAND OPEN EDC, PUMP 9.8# MUD TO SURFACE AT 2.13 BPM / 4,200 PSI. 10,069.00 PROD1 WITH 9.8R MUDALLTHE WAYAROUND, CONDUCT 4 PICKUPS AT 30 FT/MIN FROM A DEPTH OF 8,575' WITH ZERO PUMP. EACH TIME WEIGHT BREAKS OVER AT 37K, STARTING AT 30K. PICKUP DISTANCES TO BREAKOVER ARE 2.7 FT, 2.3 FT, 2.9 FT, AND 2.5 FT. POOH - MUD WEIGHT: 9.82 PPG tN, 9.84 PPG OUT - RATE: 2.05 BPM IN, 1.65 BPM OUT - PAINT FLAGS WHILE POOH. Printed 11/6/2017 131:13PM *All depths reported in Drillers Depths' North America - ALASKA - BP Page 1 of 18 Operation Summary Report Common W611 Name: 04-38 AFE No Event Type: COM- ONSHORE (CON) Start Date. 10/15/2017 End Date: 10/22/2017 X3-018JR-C: (1,134,044.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Daterrime: 6/21/1991 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143 Active datum. KB @53.00usft (above Mean Sea Level) Date From - To Hrs Phase Task Unit or Code NPT NPT Description of Operations (hr) _ Rotary _ _ _ _ Depth _ 10/15/2017 00:00 - 01:00 1.00 RUNPRD CASING COIL P FLOW CHECK 10 MIN AT BHA, STATIC. OPEN RISER, INSPECT LAST 50' OF CT ABOVE THE CONNECTOR. NO WEAR SPOTS SEEN. REMOVE INJECTOR, OFF AT 00:35 UD BHA, BIT IS 5-2. 01:00 - 01:30 0.50 RUNPRD BOPSUR COIL P FUNCTION TEST BOPS. 01:30 - 03:30 2.00 RUNPRD CASING COIL P REMOVE BHI CABLE HEAD. BOOT E -LINE. INSTALL 1 JT OF CSH IN WELL, MAKE UP INJECTOR AND PUMPALL SLACK OUT. PUMP OUT 249' OF E -LINE. 03:30 - 05:30 2.00 RUNPRD CASING COIL P REMOVE NABORS CONNECTOR AND INSTALL BTT CONNECTOR. - PULL TEST @ 35K, PRESSURE TEST @ _ 3500 PSI, OK. 05:30 - 06:15 0.75 RUNPRD CASING COIL P PJSM. LAUNCH 3/4"STEEL BALL. - WITH REEL POSITION @ ONE O'CLOCK LAUNCH W/ 3500 PSI. - HEAR BALL ROLLING, PUMP @ 3050 PSI, 40 BBLS. _ -BALL RECOVERED 06:15 - 07:45 1.50 RUNPRD CASING COIL P RIG UP TO RUN LINER. - VERIFY PIPE COUNT IN PIPE SHED - RIG UP EQUIPMENT ON THE FLOOR. - SAFETY JT W/ SAFETY VALVE IN PLACE - PRE JOB MEETING WITH THE CREW - EMPHASIS ON COMMUNICATION AND NOT GETTING IN A HURRY. 07:45 - 1215 4.50 RUNPRD CASING COIL P MAKE UP SHOE TRACKAND LINER. - MAKE UP 1ST (5) CONNECTIONS AND DRIFT AS PER PROGRAM. - CONDUCT WELL CONTROL DRILL WHILE RUNNING LINER. - SAFETY VALVE MADE UP AND TORQUED, VALVE IN POSITION AND CLOSED. ALL HANDS AT STATIONS AND REPORTED IN. TIME = 3 MIN 5 SECONDS. WELL SECURED. - CONTINUE RUNNING LINER AS PER PROGRAM. 12:15 - 15:45 3.50 RUNPRD CASING COIL P MAKE UP LINER ASSEMBLY TO COIL. - PRESSURE TEST QTS @ 3500 PSI, GOOD TEST. - RIH W/ LINER ASSEMBLY...23 BPM 1950 PSI. 1:31:46PM 'All depths reported in Drillers Depths' Printed 11/6/2017 1*31:46PM 'All depths reported in Drillers Depths' North America - ALASKA - SP Page 2 of 18 Operation Summary Report Common Well Name: 04-38 AFE No Event Type: COM- ONSHORE (CON) Start Date: 10/15/2017 End Date: 10/2212017 X3-018JR-C: (1,134,044.00 ) Project: Prudhoe Bay Site: PB DS 04 STACKING WT REPEATEDLYAT 9,600'. Rig Name/No.: CDR -2 Spud DateTme: 8/21/1991 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usft (above Mean Sea Level) Date From - To Hire Phase Task Unit or Code NPT NPT Description of Operations (hr) _ Rotary _ Depth TRAP PRESSURE WITH CHOKE AND 15:45 - 16:15 0.50 RUNPRD CASING COIL P CORRECT@ EDP FLAG FOR WINDOW. WORK PIPE WITH NO PUMP. (EDP FLAG @ 6900) WORK PIPE DOWN TO 9,659'. - MINUS 33' CORRECTION, DEPTH START MINERAL OILAND SPACERS CORRECTED ON BHI SCREEN. - ODE NOTIFIED, PIPE IN PIPE SHED j RECOUNTED, ALLGOOD. AT 9,660' WORK PIPE WITH NO PUMP, - UP AT 38K, DOWN WT 25K. PICK UP TO j BREAK OVER 3'. 18.45 - 2030 1.75 RUNPRD CASING - BREAKOVER DETERMINED PUMPING N DPRB 9,720.00 CONTINUE CIRCULATE MINERAL OIL TO .23 BPM, 30 FPM PICK UP SPEED j -CONTINUE IN HOLE THRU WINDOW, SMOOTH. PSI WHILE PUMPING KCL. - 40 FPM /.23 BPM @ 1200 PSI, 22K WORK PIPE DOWN TO 9,724' WHILE DCWN WT. 16:15 - 17:30 1.25 RUNPRD CASING COIL P TAG UP @ 9720', (24N). CASING COIL - FROM STACK OUT, (0 ON WT KCL SPACER STARTING TO EXIT THE INDICATOR), TO 41 K UP WT = 11'. Printed 11/6/2017 1*31:46PM 'All depths reported in Drillers Depths' - WORK PIPE AND PREPARE TO PUMP KCL SPACER AND MINERAL O_IL. 17:30 - 18:45 1.25, RUNPRD CASING COIL j N DPRB 9,720.00 STACKING WT REPEATEDLYAT 9,600'. INCREASE WHIP TO 300 PSI TO PUT 10.5 PPG ECD AT THE WINDOW. TRAP PRESSURE WITH CHOKE AND WORK PIPE WITH NO PUMP. WORK PIPE DOWN TO 9,659'. START MINERAL OILAND SPACERS DOWN THE CT. AT 9,660' WORK PIPE WITH NO PUMP, LOSING GROUND BACK TO 9,640'. 18.45 - 2030 1.75 RUNPRD CASING COIL N DPRB 9,720.00 CONTINUE CIRCULATE MINERAL OIL TO SHOE. ABLE TO GET 0.66 BPM 11,600 PSI WHILE PUMPING KCL. WORK PIPE DOWN TO 9,724' WHILE PUMPING OIL TO SHOE. 20.30 - 21:10 0.67 RUNPRD CASING COIL N DPRB 9,720.00 KCL SPACER STARTING TO EXIT THE SHOE. TRAP PRESSURE AND WORK PIPE WITH ZERO PUMP. WORK PIPE DOWN TO 9,727' NO FURTHER PROGRESS. CONTINUE CIRCULATING OIL TO SHOE. Printed 11/6/2017 1*31:46PM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 3 of 18 Operation Summary Report Common Well Name. 04-38 AFE No Event Type: COM- ONSHORE (CON) Start Date: 10/15/2017 End Date: 10/22/2017 X3-018JR-C: (1,134.044.00) Project: Prudhoe -Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Daternme: 8/21/1991 12:00 OOAM Rig Release: Rig Contractor. NABORSALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB ®53.00usft (above Mean Sea Level) Date From - To Ars Phase Task Unit or Code NPT NPT Description of Operations (hr) Rotary Depth 21:10 - 22:15 1.08 RUNPRD CASING COIL P DPRB 9,720.00 WITH 2 BBLS OIL OUT START WORKING 2215 - 2300 0.75 RUNPRD CASING N 23:00 - 00:00 1.00 RUNPRD CASING 10/16/2017 00:00 - 01:00 1.00 RUNPRD CASING 01:00 - 03:30 2.50 RUNPRD CASING 03'.30 - 0430 1.00 RUNPRD CASING 04:30 - 07:00 2.50 RUNPRD CASING 0700 - 0930 2.50 RUNPRD CASING COIL N DPRB 9,720.00 COIL N DPRB 9,720.00 COIL N DPRB 9,720.00 COIL N DPRB 9,720.00 COIL P DPRB 9,720.00 COIL N DPRB 9,720.00 COIL N DPRB 9,720.00 Printed 11/6/2017 1:31:46PM *All depths reported in Drillers Depths' PIPE DOWN AT 20-30 FT/MIN. SLOW DOWN TO KEEP RIH WEIGHT AROUND 18K. WORK PIPE DOWN TO 9,865'. PARKAT 9,860' AND PUMP 3 MORE BBLS OIL OUT. WORK PIPE HERE, NO PROGRESS MADE. PUMP 2 MORE BBLS OIL OUT, TRAP PRESSURE AND WORK PIPE WITH PUMPS OFF. WORK DOWN TO 9,864', STACKING HERE 3 TIMES. PUMP 2 MORE BBLS OIL OUT, WORK PIPE WITH PUMPS AT 0.2 BPM. TRY VARIOUS RUNNING SPEEDS, 20 - 70 FT/MIN. STACKING WT REPEATEDLYAT 9,860'. PUMP REMAINING OIL OUTAT 9,855'. WORK PIPE HERE, PUMPS ON, PUMPS OFF VARIOUS RUNNING SPEEDS, NO PROGRESS. CIRCULATE AT 9,847' AT 0.67 BPM / 1,400 PSI WORK PIPEAT MIN RATEAND ZERO RATE, KEEP 300 PSI WHIP. NO PROGRESS, LOST FOOTAGE BACK TO 9,840'. PARK HERE AND CIRCULATE OILAND SPACERS OUT OF HOLE. CONTINUE CIRCULATING LVT OUT OF WELL, ALL OIL CIRCULATED OUT OF WELL. TRAP 300 PSI WHIP AND WORK PIPE FROM 9,8401. WORK PIPE DOWN TO 9,852'. PUMP 10 BBLS KCL SPACER FOLLOWED BY 20 BBLS LVT FOLLOWED BY 10 BBLS KCL. WITH 2 BBL LVT OUT, START WORKING PIPE. PICK UP AND WORK DOWN TO 9,885'. CIRCULATE 7 BBLS OIL OUT AND TRAP 300 PSI, WORK DOWN TO 9,897' WITH 0 PUMP. CONTINUE WORKING PIPE DOWN TO 9,979' WITH NO PUMP. NO FURTHER PROGRESSAFTER LVT IS PUMPED OUT. CIRCULATE LVT OUT OF HOLE, HOLD 250 PSI WHP. LINE UPAND PUMP 10 BBLS KCL, 25 BBLS MINERALOIL, 10 BBLS KCL. - PUMPING .83 BPM @ 1680 PSI, .82 BPM RETURN RATE. - CHASE W/ 9.8 PPG 20K LSRV MUD North America - ALASKA- BP Operation Summary Report Page 4 of 16 Common Well Name: 04-38 AFE No Event Type: COM- ONSHORE (CON) Start Date'. 10/15/2017 End Date: 10/22/2017 X3-018JR-C: (1,134,044.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Daternme: 8/21/1991 12'.00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usft (above Mean Sea Level) Date From - To Hire Phase Task Unit or Code NET NPT Description of Operations - _.. (hr) _ - Rotary _ Depth _ 09:30 - 13:45 4.25 RUNPRD CASING COIL N DPRB 9,72000 PJSM. WITH MINERAL OIL OUT AT BULLNOSE, (3) BBLS BEGIN WORKING PIPE. - PICK UP TO UP WT, PIPE NOT FREE. PULL TO 62K, NOT FREE. - SET BACK DOWN, UNABLE TO GO DOWN, WORK BACK UP TO 70K, NOT FREE. - CONTINUE WORKING PIPE, (CLEAN CHAINS), AND USE VARIOUS TECHNIQUES. - UNABLE TO FREE PIPE UP OR DOWN. CONSULT TOWN DURING THIS OPERATION. - ALL MINERAL OIL OUT, DECISION MADE TO DISPLACE WELLTO 8.6 PPG MUD. - CIRCULATE OUT MINERAL OILAND - _ SPACERS HOLDING 250 PSI WELL HEAD. 13.45 - 15:15 1.50 RUNPRD _ CASING COIL N DPRB 9,720.00 PUMPING 8.6-8.7 PPG 42K LSRV USED MUD. - PRESSURE IS BAKER MAX (1700) PSI 13 BPM. - CONSULT TOWN ODE AND AGREE TO PUMP KCL. 15.15 - 17.30 2.25 RUNPRD CASING COIL N DPRB 9,720.00 START 1% SLICK KCL, (.6% BARALUBE) DOWNHOLE. -.17 BPM @ 1700 PSI. RATE INCREASING TO .75 BPM / 1625 PSI W/ 30 BBLS _PUMPED. 17:30 - 1900 1.50 RUNPRD CASING COIL N DPRB 9,720.00 CT STILL STUCKAT 9,948'. FINISH CIRCULATING WELL TO KCL. AFTER KCLAROUND PICK UP CT TO 70K AND DUMP WHP, NO MOVEMENT. CYCLE PIPE 3 TIMES 3K TO 70K, NO MOVEMENT. 19:00 - 20:00 1.00 RUNPRD CASING COIL N DPRB 9,720.00 PUMP20 BBLS MINERALOILTOTHE SHOE. 20.00 - 20:30 0.50 RUNPRD CASING COIL P DPRB 9,720.00 PUMP S BBLS OILOUTAND SOAK FOR 15 MIN. CYCLE PIPE TO 60K, PIPE IS FREE. WORK PIPE DOWN TO 9,983'. PICK UPAND WORK PIPE DOWN TO 10,006'. KEEP 230 PSI WHP ON ITAND SOAK FOR ANOTHER _5_MIN, NO PROGRESS. 2030 - 2200 1.50 RUNPRD CASING COIL N DPRB I 9,720.00 PUMP 4 MORE BBLS OUT AND SOAK FOR 15 MIN, NO PROGRESS. PUMP 4 MORE BBLS OUT, SOAK FOR 20 MIN, WORK DOWN TO 10,007'. CYCLE PIPE 3 TIMES HERE, NO FURTHER PROGRESS. PUMP REMAINING OIL OUT AND SOAK FOR 20 MIN, NO PROGRESS. 22.00- 23:30 1.50 RUNPRD CASING COIL N DPRB 9,720.00 CIRCULATE OIL OUT OF WELL, HOLD 200 _ PSI WHP. 2330 - 00:00 0.50 RUNPRD CASING COIL N DPRB 9,720.00 ALL OIL OUT, TRY TO WORK PIPE NO PROGRESS. PUMP 20 BBLS LVT DOWN CT. PUMP S BBLS OUTAND LET SOAK 15 MIN, Printed 11/6/2017 1:31:46PM *All depths reported in Drillers Depths* 0800 - 12:30 4.50 12'.30 - 1330 1.00 1330 - 1430 1.00 14:30 - 16:30 2.00 116:30 - 17:00 0.50 17:00 - 18:00 1.00 North Arnenca - ALASKA- BP Page 5 of 18 Operation Summary Report Common Well Name: 04-38 FPM, 10 1/2', NO PUMP. AFE No Event Type: COM- ONSHORE (CON) Start Date. 10/15/2017 End Date'. 10/22/2017 X3-018JR-C: (1,134,044.00) Project: Prudhoe Bay Site: PB DS 04 MOVEMENT. Rig Name/No.: CDR -2 Spud Date/Time. 8/21/1991 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usft (above Mean Sea Level) - MADE IT TO 10,039' ON (4TH) Date From - To Hrs Phase Task Unit or Code NPT NPT Description of Operations (hr) Rotary _ Depth 10!17/2017 W66-7-6166 3.00 RUNPRD CASING COIL N DPRB 9,720.00 WORK PIPE DOWN TO 10,004'. - WITH (5) BBLS OUT OF BULLNOSE, LET SOAK (30) MINUTES. _ PUMP 3 MORE BBLS OUT, LET SOAK DPRB 9,720.00 WORK LINER DOWN TO 10,030'. PUMP 5 MORE BBLS OUTAND LET SOAK FOR 15 MIN, NO PROGRESS WORKING FOR 30 MIN, WORK PIPE WITH NO PROGRESS. PIPE. DPRB 9,720.00 PUMP 3 MORE BBLS LVi OUT. SOAK FOR 30 MIN AND WORK PIPE, NO PUMP 4 BBLS OUT, LET SOAK FOR 15 PROGRESS. HAVE NOT MADE ANY PROGRESS WITH MIN, NO PROGRESS. THE LAST LVT PILL, DECISION IS MADE TO CARRY ON WITH BALL DROP AND PUMP REMAINING OIL OUTAND SOAK CEMENTING. _ RUNPRD CASING COIL N DPRB 9,720.00 CIRCULATE LVT OUT, HOLD 300 PSI FOR 20 MIN, WORK DOWN TO 10,019'. WHP. _ RUNPRD CASING COIL N DPRB 9,720.00 CONDUCT2 PICKUPS AT 30 FT/MIN LET SOAKANOTHER 20 MIN, WORK PIPE FROM 10K STRING WEIGHT TO 52K, PICKUP WEIGHT WITH DRILLING BHAAT DOWN TO 10,034'. THIS DEPTH WAS 37K. LET SOAK FOR 20 MIN, WORK PIPE WITH PICKUP DISTANCE IS 12.2 FTAND 11.7 NO PROGRESS. STACK WT BACK DOWN TO 10,026'. RUNPRD CASING COIL P LET SOAK FOR 20 MIN, WORK PIPE WITH PROCEDURE FOR DROPPING BALL. NO PROGRESS_ _ 03:00 - 04:30 1.50 RUNPRD CASING COIL N DPRB 9,720.00 CIRCULATE OIL OUT, HOLD 200 PSI WHP. 0430 - 0800 3.50 RUNPRD CASING COIL P DPRB 9,720.00 PUMP 20 BBL LVT PILL INTO CT. 0800 - 12:30 4.50 12'.30 - 1330 1.00 1330 - 1430 1.00 14:30 - 16:30 2.00 116:30 - 17:00 0.50 17:00 - 18:00 1.00 Printed 111612017 1:31:46PM *All depths reported in Drillers Depths` - W/ 5 BBLS OUT, LET SOAK (25 MIN). - PICK UP FROM 10K DOWN TO 42K @ 30 FPM, 10 1/2', NO PUMP. - RBIH, 35 FPM, SET DOWN, NO MOVEMENT. REPEAT (2X), NO MOVEMENT. - PICK UP TO NEUTRAL, PUMP OUT (3) MORE BBLS MINERAL OIL 8 WAIT. - CONTINUE IN THIS FASHION UNTIL OIL IS SPENT. - MADE IT TO 10,039' ON (4TH) OSCILLATION. - LOST 7' ON THE STH AND 4 MORE ON THE 6TH. RUNPRD CASING COIL N DPRB 9,720.00 CIRCULATE OUT MINERAL OIL. - PUMP (1) MORE MINERAL OIL PILL, (25 BELS). - WITH (5) BBLS OUT OF BULLNOSE, LET SOAK (30) MINUTES. _ RUNPRD CASING COIL N DPRB 9,720.00 WORK LINER DOWN TO 10,030'. PUMP 5 MORE BBLS OUTAND LET SOAK FOR 30 MIN, WORK PIPE WITH NO PROGRESS. RUNPRD CASING COIL N DPRB 9,720.00 PUMP 3 MORE BBLS LVi OUT. SOAK FOR 30 MIN AND WORK PIPE, NO PROGRESS. HAVE NOT MADE ANY PROGRESS WITH THE LAST LVT PILL, DECISION IS MADE TO CARRY ON WITH BALL DROP AND CEMENTING. _ RUNPRD CASING COIL N DPRB 9,720.00 CIRCULATE LVT OUT, HOLD 300 PSI WHP. _ RUNPRD CASING COIL N DPRB 9,720.00 CONDUCT2 PICKUPS AT 30 FT/MIN FROM 10K STRING WEIGHT TO 52K, PICKUP WEIGHT WITH DRILLING BHAAT THIS DEPTH WAS 37K. PICKUP DISTANCE IS 12.2 FTAND 11.7 FT. STACK WT BACK DOWN TO 10,026'. RUNPRD CASING COIL P CONDUCT PJSM AND REVIEW NABORS PROCEDURE FOR DROPPING BALL. DROP 5/8" BALL, LAUNCH WITH 3,000PSI. Printed 111612017 1:31:46PM *All depths reported in Drillers Depths` Common Well Name: 04-38 Event Type: COM- ONSHORE (CON) North America - ALASKA- BP Operation Summary Report Start Date: 10/15/2017 End Date. 10/222017 Page 6 of 18 1 AFE No X3-018JR-C:(1,134,044.00) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud DateRme: 8/21/1991 12:00:OOAM Rig Release: Active datum: KB @53.00usR (above Mean Sea Level) Date From - To Him Phase Task _ (hr) 18:00 - 19:30 1.50 RUNPRD CASING 19:30 22:30 3.00 RUNPRD CASING 2230 - 0000 1.50 RUNPRD EVAL 10/18/2017 00:00 - 03.00 3.00 RUNPRD EVAL 0300 - 0515 2.25 RUNPRD EVAL 05:15 - 08:15 3.00 RUNPRO EVAL BPUOL USA00001143 Unitor Code NPT NPT Description of Operations Rotary Depth COIL P AFTER REEL VOLUME +5 BBLS BALL DOESN'T LAND. CYCLE PIPE AND PUMP. TRY VARIOUS FLOW RATES AND PICKING UP/ SLACKING OFF, NO LUCK. PUMP 5 BBLS VISCOUS PILL DOWN THE CT. COIL P BALL IS ON SEAT, PRESSURE UP TO 3,700 PSI AND SHEAR OUT. CONDUCT 2 PICKUPS AT 30 FT/MIN, NO PUMP, PICKUP 10K TO 40K WITH 9.2 FT OF TRAVEL, NO BREAKOVER SEEN. PICKUP 10K TO 48K WITH 10.4 FT OF TRAVEL, NO BREAKOVER SEEN. PICKUP WEIGHT WITH DRILLING BHA AT THIS DEPTH WAS 37K. PUMP 15 BBLS HI -VIS PILLAROUND, DISCUSS PLAN FORWARD WITH ODE, SR WSL. _ COIL N DFAL 10,029.00 AFTER HI -VIS PILL IS OUT, CONDUCT 2 MORE PICKUPS. PICK UP TO 40K WITH 9.7' OF TRAVEL, NO BREAKOVER. PICK UP TO 47K WITH 10.2'OF TRAVEL, NO BREAKOVER. USE WELLWORC GRAPHS TO ANALYZE PICKUPS. COIL N DFAL 10,029.00 CONDUCT 3 MORE PICKUPS WITH 13 FT OF TRAVEL TO DIAGNOSE IF LINER IS RELEASED OR NOT. ANALYZE CHARTS FROM WELLWORC TO DETERMINE BREAKOVER POINT. DISCUSS WITH ODE AND BOT FIELD REPS. _ COIL N DFAL 10,029.00 MIX 30 -BBL 4% LUBE PILL WITH 40K _SRV - PUMP DOWN INITIALLYAT.94 BPM IN, 1515 PSI WITH SLIGHT VARYING LOSSES TO FORMATION. INCREASE RATE TO 1.48 BPM IN, 3270 PSI WITH APPROXIMATELY 6 BPH LOSSES TO FORMATION. CIRCULATION PRESSURE DROPPED TO 2980 PSI, LOSSES FELL OFF SLIGHTLY AS PILL MOVE OUT OF LINER AND INTO OPEN HOLE. - MW IN 8.53 PPG, MW OUT 8.47 PPG - WITH PILLAROUND AND ABOVE DEPLOYMENT SLEEVE, CONDUCT PICKUP ATTEMPTS WITH INDICATIONS OF BREAKOVER AT 37-38K PU W V OFF BOTTOM (TYPICAL BREAKOVER ON 2" COIL WITH 2-3/8" LINER IS -7'). COIL N DFAL 10,029.00 SEND DATA TO ODE FOR ANALYSIS -ANALYZE DATA, DISCUSS AMONGST _ ENGINEERING TEAM _ Printed 11/8/2017 1:31:46PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 7 of 18 Common Well Name: 04-38 AFE No Event Type: COM- ONSHORE (CON) Start Dale: 10/15/2017 End Date: 10/22/2017 X3-018JR-C: (1,134,044.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Date/Time: 8/21/1991 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USAO0001143 Active datum: KB @53.00usft (above Mean Sea Level) Date From - To Hrs Phase Task Unit or Code NPT NPT Description of Operations (hr) Rotary Depth _ 08:15 - 10:30 2.25 RUNPRD CEMT COIL P CONDITION WELL FOR CEMENT JOB - CIRCULATE LUBE PILL COMPLETELY OUT, OBTAIN CIRC PRESSURES WITH CLEAN KCL ALL THE WAY AROUND. 3400-3500 PSI AT 1.5 BPM WITH INITIAL LOSSES OF 15-24 BPH LOSSES. - DROP RATE BACK TO 1.15 BPM WITH LOSS RATE DROPPING TO 9 BPH - BLOW THROUGH LINES, DOUBLE-CHECK VALVES - PRESSURE CROSSCHECK WITH CEMENTER, PRESSURE TEST CEMENT UNIT TO 4900 PSI WITH GOOD LEAK TIGHT TEST. - PJSM WITH CREW, CEMENTERS, TRUCKING REP -PRESSURE CROSSCHECK, DISCUSS CONTINGENCY IF CEMENTERS HAVE TO TAKE OVER DISPLACEMENT - CREW DOWN TO UNIT TO BATCH UP CEMENT Printed 11/6/2017 1.31:46PM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 8 of 18 Common Well Name: 04-38 AFE No Event Type-. COM- ONSHORE (CON) Start Date: 10/15/2017 End Date. 10/22/2017 X3-018JR-C: (1,134,044 00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Date/Time: 8/21/1991 12:00:OOAM Rig Release. Rig Contractor: NABORSALASKA DRILLING INC. BPUO1: USA00001143 Active datum: KB @53.00usft (above Mean Sea Level) Date From - To Him Phase Task Unit or Code NPT (hr) _ Rotary_ _. 10:30 - 12:30 2.00 RUNPRD CEMT COIL P NPT Description of Operations Dept_ MIX 16.4 BBLS OF CEMENT, PUMP 11.4 BBL - CEMENT WETAT 1040 HRS - CIRCULATE CEMENT DOWN WITH 8.5 PPG EXHAUST PILLATAVERAGE 1.30 BPM IN, 1.05 BPM OUT, 3870 PSI - SHUT DOWN PUMPS AT 47.7 BBLS AWAY (3.6 BELS BEHIND PIPE) - LAUNCH PEE WEE DARTAND LINER WIPER PLUG, PICK UP TO BREAKOVER 112' PER BTT REP, EXPOSE DOGS, SET DOWN 10' HIGHER - PUW 40K LBS - SHIFT LINER WIPER PLUG DOWN, PICK BACK UP 2' AND SIDE EXHAUST 5 BBLS - SET DOWN 10KAND LAUNCH PEE WEE DART, PRESSURE UP ON WIPER PLUG TO 1500 PSI AND ZERO MM - DID NOT HAVE CLEAR INDICATION THAT LINER WIPER PLUG SHEARED BUT CIRCULATION PRESSURES DID RISE AND CONTINUED TO WHILE DISPLACING LINER WIPER PLUG - DISPLACE AT X BPM 1.25-1.30 BPM, INITIAL CIRC PRESSURE OF 4000 PSI DROPPED TO 3230 PSI AND ROSE TO AS HIGH AS 4600PSI; FINAL DISPLACEMENT PRESSURE OF 4000 PSI - PLUG DID NOT BUMP AT CALCULATED 5.6 BELS, STOP PUMPING AT 6.15 BBLS - OPEN CHOKE BLEEDER AND CHECK FLOATS, GOOD TEST. - CLOSE BLEEDER, PRESSURE UP TO 1000 PSI ON COIL, PICK UPAND CONFIRM PRESSURE DROPAND DISPLACEABOVE LINER TOP WITH 15 BBLS OF EXHAUST PILL - CEMENT IN PLACE 1230 HRS - 8.55 BBLS CEMENT BEHIND PIPE, BASED ON CEMENT PUMPED AND LOSSES - TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE: 1.7 BBLS Printed 11/6/2017 1:31:46PM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 9 of 18 Common Well Name: 04-38 AFE No Event Type: COM -ONSHORE (CON) Start Dale'. 10/15/2017 End Date: 10/22/2017 X3-018JR-C'. (1,13404400) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No: CDR -2 Spud Date/Time: 8/21/1991 12:00:OOAM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usft (above Mean Sea Level) Date From - To His Phase Task Unit or Code NPT NPT Desoription of Operations (hr) Rotary _ _ Depth _ 1230 - 1715 4.75 RUNPRD CEMT COIL P DISPLACE CEMENT WHILE POH WITH BHA - CONDUCT KICK WHILE TRIPPING DRILL WITH CREW. SIMULATE PIT GAIN WITH BHATRIPPING OUT OF HOLE AT 7000'. DOWN ON PUMPS, NO FLOW AT SHAKER AND MICROMOTION READINGS WERE AT 0, MUD DENSITY IN AND OUT 8,42 PPG. . DIRECT DRILLER THAT THERE WAS SIMULATED FLOW AT SHAKER WITH PUMPSOFF. FOLLOWSTANDING ORDERS, INCREASE PRESSURE ON INJECTOR PACKOFFS AND SHUT CHOKE SIDE HCR. CREW REPORTS TO STATIONS TO STANDBY FOR ORDERS. WSL REVIEWS STEPS, GIVES ALL CLEAR FOR AAR. AAR EMPHASIS ON IDENTIFYING DIFFERENCES IN DRILLING TRENDSAND MONITORING TRIP TRENDS. DISCUSSED IMPORTANCE BEHIND USING SMALLTRIP TANKS FOR TRIPPING SO THAT TRENDS CAN BE SPOTTED QUICKLYAND IMPORTANCE OF FOLLOWING SEQUENCE OF THE STANDING ORDERS. QUESTIONED CREW ON RESPONSE IF TOTAL PVT VOLUMES VARY WHILE TRIP TANK VOLUME REMAINS ACCURATE (BAD PVT SENSORS, SURFACE LINES BEING ADJUSTED, CENTRIFUGE ON AND OFF, TRANSFER PUMPS INFLUENCE ON TOTAL PVT) AND WHAT COMMUNICATION TAKES PLACE DURING FLUID MOVEMENT. - CONTINUE WITH CEMENT DISPLACEMENT 17:15 - 20:30 3.25 RUNPRD CEMT COIL P MONITOR WELL FOR 10 MINUTES AT BHA: STATIC - INJECTOR OFF: 18:00 - LAY DOWN S JTS OF 2-1/16" CSH AND SELRT RUNNING TOOL. - TOOL HAS NOT FUNCTIONED NORMALLY, WIPER PLUG AND PEE WEE DARTARE STILL ON IT, AND ONE OF THE DOGS IS PUSHED UP OUT OF POSITION. -BTT REP INSPECT TOOLAND VERIFIES EVERYTHING RECOVERED, NOTHING LEFT IN HOLE. - TAKE PHOTOS AND DISCUSS WITH ANC TEAM, DECISION IS MADE TO MAKE A CLEANOUT RUN. REVIEW BHAAND OCN #5 WITH CREW. 20:30 - 21:00 0.50 OTHCMP CLEAN COIL N DFAL 10,069.00 PJSM AND REVIEW PROCEDURE FOR MAKING UP 1" CSH. PREP RIG FLOOR TO RUN 1" CSH. 21'00 - 22:15 1.25 OTHCMP CLEAN COIL N DFAL 10,069.00 RIG LITTLE JERKS NOTABLE TO MAKE UP 1" CSH, THE PIPE IS TOO SMALL FOR THEAVAILABLE DIES. TRYTO LOCATE LITTLE JERK DIES SOMEWHERE ON THE SLOPE THAT WILL WORK FOR i" CSH. Printed 11/6/2017 1:31:46PM *All depths reported in Drillers Depths' Common Well Name. 04-38 Event Type: COM -ONSHORE (CON) Project: Prudhoe Bay Rio Name/No.: CDR -2 Active datum: KB @53.00usft (above Mean Sea Date From - To We (hr) 22:15 - 00:00 1.75 North America - ALASKA - BP Page 10 of 18 Operation Summary Report StartDate: 10/15/2017 Site: PB DS 04 Spud DateMme:8/21/1991 is Level) Phase Task Unitor Rotary OTHCMP CLEAN COIL 10/19/2017 0000 - 0400 4.00 OTHCMP CLEAN COIL 04.00 - 07.00 3.00 OTHCMP CLEAN COIL 07:00 - 08:10 1.17J OTHCMP CLEAN I NSTALL HEAD PIN AND CIRCULATE COIL 08:10 - 1800 9.83 OTHCMP CLEAN COIL AFE No End Date 10/22/2017 X3-018JR-C:(1,134,044.00) BPUOI: USA00001143 Code NET NPT Description of Operations Depth N DEAL 10,069.00 MAKEUP BHA#5. USE COME -ALONG WITH A LOAD CELL TO ENSURE PROPER MAKEUP TORQUE OF EACH JOINT. I NSTALL HEAD PIN AND CIRCULATE THROUGH BHAAFTER 25 JTS_RAN. N DEAL 10,069.00 CONTINUE MAKING UP BHA#5 FOR CLEANOUT TO TD. MAKE UP 2 JTS OF 2-1116" CSH AND BTT LOCKABLE SWIVEL. INJECTOR ON AT 04:00. N DEAL 10,069.00 RIH WITH 1.75" CLEANOUT BHA#5. - RATE: 0.29 BPM IN, 0.44 BPM OUT. CIRC PRESSURE: 290 PSI - MUD WEIGHT: 8.40 PPG IN, 8.43 PPG OUT N DEAL 10,069.00 PICK UP WEIGHTABOVE LINER TOP 36K - CIRCULATION PRESSURE OF 1480 PSI AT 1.0 BPM ABOVE LINER TOP - ENTER INTO DEPLOYMENT SLEEVE, SLACK OFF WEIGHT WHILE RUNNING IN HOLE THROUGH LINER -24K - CIRCULATE AT 1.0 BPM, 1450-1500 PSI - START TAKING ON SLIGHT WEIGHTAT 9720', MORE WEIGHTAND PRESSURE INCREASES WHILE WASHING DOWN - PUMP TRIP WENT OFF, LOST CIRCULATION. BACK ON WITH PUMPS WHILE ALSO PICKING UP, SEEMINGLY FREE. PICKUP AGAIN, FREE, ATTEMPT TO MOVE FORWARD, MOVE -10', NO MOVEMENT, PICKUP, NO MOVEMENT. - EVALUATE, SEEMINGLY MECHANICALLY STUCK ABOVE BHA. N DEAL 10,069.00 ATTEMPT TO FREE PIPE - USE VARYING CIRCULATION RATES AND HI -VIS PILLS TO WORK PIPE FREE - MAX PICK UP WEIGHTS OF 60K - ATTEMPTED TO CIRCULATE AT.7 BPM AND HAD A CORRESPONDING PRESSURE INCREASE UP TO 4200 PSI AND HAD SUDDEN PRESSURE 2000 PSI DECREASE AND FULL LOSSES TO SHOE. - DROP CIRCULATION DOWN TO .1 BPM, EVENTUALLY REGAINED MARGINAL RETURNS - HAVE NOT SEEN CEMENT IN RETURNS TO THIS POINT - CIRC DOWN HI -VIS PILL, GAINED RETURNS OVERTIME. EVENTUALLY ABLE TO CIRCULATE AT .58 BPM WITH .55 BPM RETURNS, SIGNIFICANT AMOUNT OF GROUND UP CEMENT COMING BACK, NO CHIPS. - DISCUSSION ON OPTIONS WITH ODE TEAM WHILE CIRCULATING. CIRC DOWN 10 BBL HI -VIS PILL FOLLOWED BY 18 BBL MINERAL OIL PILLAND CHASED BY 15 BBLHI-VISPILL. PUMPDOWNAT.51 BPM IN, .39 BPM OUT, 3325 PSI. - STAGE 5 BBLS MINERAL OIL OUT OF BHAAND LET SOAK PER Printed 11/8/2017 1'.31:46PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: 04-38 AFE No Event Type: COM- ONSHORE (CON) Start Date. 10/15/2017 End Date: 10/22/2017 X3-018JR-C: (1,134,044.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Date/time: 8/21/1991 12:00:00AM Rig Release: Page 11 of 18 Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usft (above Mean Sea Level) Date From - To Him Phase Task Unit or Code NPT NPT Description or Operations (hr) Rotary Depth 18:00 - 19:00 1.00 OTHCMP CLEAN COIL N DFAL 10,069.00 PUMP OIL OUT IN STAGES, ALLOW TO SOAK AND WORK PIPE, NO MOVEMENT. TRAP WHIP AND DUMP IT WHILE _ WORKING PIPE, NO MOVEMENT. 19'00 - 20:00 1.00 OTHCMP CLEAN COIL N DFAL 10,069.00 PUMP ALL REMAINING OIL OUT, CYCLE PIPE 3 TIMES 22K TO 65K, NO MOVEMENT. PUMP HI -VIS OUT 0.51 / 0.34 BPM. WITH HI -VIS OUT OF THE LINER CYCLE PIPE 22K TO 65K 3 TIMES, NO MOVEMENT. 2000. - 22 15 2.25 OTHCMP CLEAN COIL N DFAL 10,069.00 CONTINUE CIRCULATING MINERAL OIL OUT. REGAIN FULL CIRCULATION SUDDENLY AT 19:55, LOSEABOUT 1,000 PSI CIRC PRESSURE. PUMP 1.01/ 0.98 BPM AT 2,300 PSI. WORK PIPE 2 TIMES SLOWLY WHILE CIRCULATING. INCREASE PUMP RATE UP TO 11.201 1.19 BPM AT 3,000 PSI. NO PIPE MOVEMENT. GET OCN #6 AND WSUP, ETL APPROVALTO DISCONNECT. 22:15 - 23:30 1.25 OTHCMP CLEAN COIL N DFAL 10,069.00 CONDUCT PJSM AND REVIEW PROCEDURE FOR DROPPING BALL. LAUNCH 5/6" ALUMINUM BALL WITH 3,500 PSI. BALL IS NOT HEARD ROLLING, INITIALLY. PUMP BALLAROUND AT 1.20/1.20 BPM AT 3,270 PSI. AT 31 BBLS AWAY SEE 300 PSI INCREASE, PRESSURE DOES NOT DROP OFF. PUMP 0.82 / 0.81 BPM AT 2,000 PSI. 23'.30 - 00:00 0.50 OTHCMP CLEAN COIL N DFAL 10,069.00 PICKUP TO 35KAND PIPE IS FREE. PICK UP SLOWLY 7 FT/MIN. PRESSURING UP, SLOWLY WORK PIPE DOWN AND UP. KEEP RATE AS HIGH AS POSSIBLE. POOH SLOWLY INITIALLYAROUND 5 FT/MIN. _ 10/20/2017 00:00 - 00:30 0.50 OTHCMP CLEAN COIL N DFAL 10,069.00 SLOWLY EASE RATE UPTO 1.28/1.25 BPM AT 3,800 PSI. PRESSURE UP, BRING RATE BACK DOWN TO 1.1 BPM. PUMP 5 BBLS MUD SWEEPAROUND. PRESSURE UP AT 9,625', CAN'T GO DOWN REACHING RIH WEIGHT LIMIT. CONTINUE PUMPING 0.63 / 0.02 BPM AND POOH AT 3 FT/MIN. GET RETURNS BACK AROUND 9,600'. SLOWLY INCREASE PUMP RATE. PRESSURING UP OCCASIONALLY, EACH TIME CAN'T MOVE DOWN. 00:30 - 02:30 2.00 OTHCMP CLEAN COIL N DFAL 10,069.00 AFTER 9,300' PRESSURE AND PICKUP WEIGHTSTEADYING OUT. INCREASE TO 10 FT/MIN POOH. VERY LITTLE COMING ACROSS SHAKER. PUMP 10 BBLS MUD SWEEP. Printed 11/6/2017 1:31:46PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name. 04-38 AFE No Event Type. COM- ONSHORE(CON) Start Date: 10/15/2017 End Date: 10/22/2017 X3.018JR-C:(1,134,044,001 Protect: Prudhoe Bay Site: PB DS 04 Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: KB @53.00usR (above Mean Sea Level) Date From - To Hire Phase Task (hr) NET 0230 - 0420 1.83 OTHCMP CLEAN 0420 - 11:00 6.67 OTHCMP I CLEAN 11.00 - 1615 5.25 OTHCMP CLEAN 1615 - 18:00 175 OTHCMP CLEAN Printed 11/6/2017 1:31:46PM *All depths reported in Drillers Depths' Page 12 of 18 BPUOI: USA00001143 Description of Operations SWEEP IS OUT THE BHA. RUN BACK IN FROM 8,700' TO CIRCULATE OUT THE LINER. WEIGHT CHECK AT 8,900' IS 33K, SMOOTH PICKUP. AT 9,130' PICKUP IS 35K, SMOOTH PICKUP. PUMPANOTHER 10 BBLS MUD SWEEP. CONTINUE RIH PUMP 1.30 /1.32 BPM AT 3,580 PSI. AT 9,300' PRESSURE INCREASES TO 3,900 PSI. WEIGHT CHECK HERE IS 35K, SMOOTH PICKUP. RIH AGAIN, PAST 9,320 FT PRESSURE UP AGAIN TO 4,200 PSI AT 1.29 BPM. SLIGHT WEIGHT SET DOWN, 1-2K. PICK BACK UP, TRYAGAIN WITH SAME RESULT AT THE SAME DEPTH. DISCUSS WITH ODE, DECIDE TO POOH FOR CLEANOUT BHA. POOH, PULL SLOWLY UNTIL LAST MUD SWEEP EXITS THE BHA - PRESSURES INCREASED AS BHA GOT CLOSER TO LINER TOP AT 8530'. CIRC PRESSURE OF 3900-3980 PSI AT 1.28 BPM IN. PRESSURE DROP WITH BHA EXITING LINER TOP. - MW IN 8.55 PPG, 8.46 PPG OUT AT LINER TOP WITH HI -VIS PILL COMING UP HOLE TO HELP CUTTINGS OUT - BHAABOVE LINER TOP, 1.29 BPM IN, 3550-3600 PSI CIRC PRESSURE - SIGNIFICANT PRESSURE INCREASE TO 42004350 PSI AT 1.45 BPM. CORRELATE TO HI -VIS SWEEP AND CONTAMINATED CEMENT RETURNS COMING UP HOLE. JOG DOWN TO GET BELOW IT AND TURN AROUND TO AGAIN PULL TO SURFACE. -PULL TO SURFACE, JOG DOWN 500' AND POH FOR FLOW CHECK. - FLOW CHECK AT SURFACE, ALL GOOD. POP OFF WITH INJECTOR. INSPECT COILAS IT IS PULLED BACK. NO MARRING / SCARRING AT CONNECTORAREA. - BREAK OFF AND LAY DOWN UPPER BHA, CHANGE OUT ELEVATORS - LAY DOWN 1" WORK STRING AND BREAK OFF BOT TOOLS. DISCONNECT IN GOOD SHAPE, BALLON SEATAND RETRIEVED. - MU 1.875" MILL ONTO BOT TOOLS AND 1" WORK STRING PER O_CN PRESSURE TEST QUICKTEST SUB - RIH WITH 1.875" MILLING BHA#6 ON 1.69" BOT MOTOR Unit or Code NET NET Rotary Depth COIL N DEAL 10,069.00 COIL N DEAL 10,069.00 COIL N DEAL 10,069.00 COIL N DEAL 10,069.00 Printed 11/6/2017 1:31:46PM *All depths reported in Drillers Depths' Page 12 of 18 BPUOI: USA00001143 Description of Operations SWEEP IS OUT THE BHA. RUN BACK IN FROM 8,700' TO CIRCULATE OUT THE LINER. WEIGHT CHECK AT 8,900' IS 33K, SMOOTH PICKUP. AT 9,130' PICKUP IS 35K, SMOOTH PICKUP. PUMPANOTHER 10 BBLS MUD SWEEP. CONTINUE RIH PUMP 1.30 /1.32 BPM AT 3,580 PSI. AT 9,300' PRESSURE INCREASES TO 3,900 PSI. WEIGHT CHECK HERE IS 35K, SMOOTH PICKUP. RIH AGAIN, PAST 9,320 FT PRESSURE UP AGAIN TO 4,200 PSI AT 1.29 BPM. SLIGHT WEIGHT SET DOWN, 1-2K. PICK BACK UP, TRYAGAIN WITH SAME RESULT AT THE SAME DEPTH. DISCUSS WITH ODE, DECIDE TO POOH FOR CLEANOUT BHA. POOH, PULL SLOWLY UNTIL LAST MUD SWEEP EXITS THE BHA - PRESSURES INCREASED AS BHA GOT CLOSER TO LINER TOP AT 8530'. CIRC PRESSURE OF 3900-3980 PSI AT 1.28 BPM IN. PRESSURE DROP WITH BHA EXITING LINER TOP. - MW IN 8.55 PPG, 8.46 PPG OUT AT LINER TOP WITH HI -VIS PILL COMING UP HOLE TO HELP CUTTINGS OUT - BHAABOVE LINER TOP, 1.29 BPM IN, 3550-3600 PSI CIRC PRESSURE - SIGNIFICANT PRESSURE INCREASE TO 42004350 PSI AT 1.45 BPM. CORRELATE TO HI -VIS SWEEP AND CONTAMINATED CEMENT RETURNS COMING UP HOLE. JOG DOWN TO GET BELOW IT AND TURN AROUND TO AGAIN PULL TO SURFACE. -PULL TO SURFACE, JOG DOWN 500' AND POH FOR FLOW CHECK. - FLOW CHECK AT SURFACE, ALL GOOD. POP OFF WITH INJECTOR. INSPECT COILAS IT IS PULLED BACK. NO MARRING / SCARRING AT CONNECTORAREA. - BREAK OFF AND LAY DOWN UPPER BHA, CHANGE OUT ELEVATORS - LAY DOWN 1" WORK STRING AND BREAK OFF BOT TOOLS. DISCONNECT IN GOOD SHAPE, BALLON SEATAND RETRIEVED. - MU 1.875" MILL ONTO BOT TOOLS AND 1" WORK STRING PER O_CN PRESSURE TEST QUICKTEST SUB - RIH WITH 1.875" MILLING BHA#6 ON 1.69" BOT MOTOR North America - ALASKA - BP Operation Summary Report Common Well Name: 04-38 Event Type. COM -ONSHORE (CON) Start Date: 10/15/2017 End Date: 10/22/2017 Project: Prudhoe Bay Site: PB DS 04 AFE No K3-018JR-C:(1,134,044.00) Page 13 of 18 Rig Name/No.: CDR -2 Spud DateRme: 8/21/1991 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usft (above Mean Sea Level) Date From- To Him Phase Task Unit or Code NPT NPT Description of Operations (hr) _ _ Rotary Depth _ 18:00 - 18:40 0.87 OTHCMP CLEAN COIL N DFAL 10,069.00 CONTINUE RIH. LOOK FOR OLD LINER FLAG AROUND 8,359' NO TRACE OF IT SEEN. AT 8,500' START 5 BBL SWEEP DOWN THE CT. WEIGHT CHECKAT LINER TOP IS 35K, '25K SLACKOFF PRESSURE IS 2,550 PSI AT 1.2 / 1.19 BPM. DRY DRIFT THROUGH LINER TOP IS CLEAN, ALL THE WAY TO 8,580'. VERY SLIGHT BOBBLE SEEN AT 8,559', NOT DEFINITIVE. 1840 - 2050 2.17 OTHCMP CLEAN COIL N DFAL 10,069.00 ENTER LINER TOP GO 701.17/1.15 BPM AT 2,540 PSI. - TOP OF LINER IS AT 8531' CORRECTED MD - TOP OF FISH (BOT CIRCULATION SUB, 1 69" MOTOR, 1.75" PARABOLIC MILL) AT -9782' UNCORRECTED MD RIH 10 FT/MIN. PICKUP AT 8,630' IS CLEAN, SLIGHT SET DOWN WITH NO MOTOR WORK. AT 8,800' PULL 100' WIPER TRIP, CLEAN PASS UP AND DOWN. SET DOWN 1 KAT 8,878', PICKUP IS CLEAN. SEE SLIGHT MOTOR WORK WORKING PAST THIS DEPTH. AT 8,900' PULL 200' WIPER TRIP, SETTING DOWN 2K AT 8,876'. SET DOWN HERE 4 TIMES WITH NO MOTOR WORK. MILL FOR ABOUT 10 MIN AT THIS SPOT WITH 2K WOB, NO PROGRESS. PICK UP AND TRY AT 10 FT/MIN, TAG AT 8,876'. PICK UP AND TRYAT 1 FT/MIN, 1.2 RATE, TAG AT 6,876'. TRY 10 FT/MIN, 1 BBL/MIN, TAG AT SAME DEPTH. PULL 200 WIPER AND GO BACK DOWN, TAG AT 8,875.8' WITH 2K DOWN. 2050 - 21:10 0.33 OTHCMP CLEAN COIL N DFAL 10,069.00 PARKAT 8,875.8' WITH 2K DOWN WEIGHT. CIRCULATE 1.211.2 BPM AT 2,640 PSI FOR 20 MIN, NO MOTOR WORK SEEN. 21:10 - 0000 2.83 OTHCMP CLEAN COIL N DFAL 10,069.00 PICK UP AND TRV TO PASS, TAG AT 8,876.5' AGAIN. PULL WIPER TRIP WITH 15 BBL SWEEP BACK ABOVE 5-1/2" LINER TO 6,600'. PULL 20 FT/MIN UP THROUGH 5-1/2" TUBING. Printed 11/6/2017 1:31:46PM 'All depths reported in Drillers Depths' North America - ALASKA -BP Operation Summary Report Page 14 of 18 Common Well Name: 04-38 AFE No Event Type: COM- ONSHORE (CON) Start Date: 10/152017 End Date: 10/22/2017 X3-018JR-O. (1,134,044.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Date/Time: 8/21/1991 12:00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usft (above Mean Sea Level) Date From - To Him Phase Task Unit or Code NPT NPT Description of Operations (hr) _ Rotary Depth -- 10/21/2017 00:00 - 01:30 1.50 OTHCMP CLEAN COIL N DFAL 10,069.00 SWEEP DOES NOT BRING BACKANY Printed 11/6/2017 1*31:46PM *All depths reported in Drillers Depths` ADDITIONAL CUTTINGS. RUN BACK IN. UP WEIGHT IS 35KAT 8,500'. RUN PAST LINER TOP WITH NO PUMP, TRV TO SEE LINER TOP. NOTHING SEEN. RIH, STACK DOWN 2KAT 8,638'. NO MOTOR WORK. PICKUP IS CLEAN, GO TO 0.74 BPM STACK OUT AT 8,640'. PICKUP AND WORK THROUGH. CONTINUE RIH AT 9 FT/MIN PUMP 1.1 BPM. TAG AT 8,875.8' SET 2K DOWN. PICKUP IS 39K. PICK UPAND TRV AT 5 FT/MIN, TAG AT 8,875.9' SET 2K DOWN. PICKUP IS 37K. TRV AT 0.58 BPM, 15 FT/MIN TAG AT 8,876.1 SET 2K DOWN. BRING RATE UP TO 1.2 BPM, STOP 2 FT ABOVE AND TRV TO MILL PAST AT 0.5 FT/MIN. KEEP 2K DOWN ON IT. 01:30 - 03:40 2.17 OTHCMP CLEAN COIL N r DFAL 10,069.00 MILL PAST TIGHT SPOT, NO MOTOR WORK SEEN. DOWN TO 8,900' ONCE AGAIN. BACKREAM THROUGH TIGHT SPOTAT 1 FT/MIN. NO MOTOR WORK SEEN. RUN BACK DOWN, NOTHING SEEN. PUMP 10 BBLS HI -VIS SWEEP DOWN. RIH TO 9,000' THEN BACK TO 8,900', CLEAN PASS, RIH TO 9,100' THEN BACK TO LINER TOP. CLEAN PASS UPAND DOWN. 03:40 - 05:10 1.50 OTHCMP CLEAN COIL N DFAL 10,069.00 RIH TO 9,200'AND BACK TO 9,100' CLEAN PASS UPAND DOWN. RIH TO 9,300'AT 13 FT/MIN. PUMP 1.18/ 1.25 BPM AT 2,850 PSI. PUMPANOTHER 10 BBL SWEEP DOWN. PULL WIPER TRIP BACK TO LINER TOP, . CLEAN PASS UPAND DOWN. _ 05:10 - 08:45 3.58 OTHCMP CLEAN COIL N DFAL 10,069.00 RIH FROM 9,300'. PUMP 1.17/1.23 BPM AT 2,900 PSI. RIH WEIGHT IS 24K -25K - CIRCULATE DOWN HI -VIS PILLAND CONDUCT SHORT WIPER FROM 9500' - MOVE DOWN AND CONTINUE TO WASH PER PLAN. CIRC DOWN ANOTHER HI -VIS PILL FROM 9625' WITH SHORT WIPER. - WASH DOWN AGAIN, NO ISSUES OR PRESSURE INCREASES. HI -VIS PILL COMING OUT OF BHA AS MILL IS AT 9750' MD UNCORRECTED DEPTH. Printed 11/6/2017 1*31:46PM *All depths reported in Drillers Depths` North America -ALASKA - BP Operation Summary Report Page 15 of 18 Common Well Name: 04-38 AFE No Event Type: COM -ONSHORE (CON) Start Date: 10/15/2017 End Date: 10/22/2017 X3-018JR-C: (1,134,044.00 ) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Date/Time: 8/21/1991 12:00:OOAM Rig Release' Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usR (above Mean Sea Level) Date From - To Hm Phase Task Unit or Code NPT NPT Description of Operations _ (hr)_ ___. Rotary ___ Depth 08:45 1.00 OTHCMP CLEAN COIL N DEAL 10,06900 PULL OFF BOTTOM WITH SWEEP COMING AROUND -VALIDATE FLAG DEPTH THROUGH EOP COMPARISON TO INITIAL FLAG MARK, CALCULATE +3' DIFFERENCE IN EOP FLAG - PICK UP HOLE WITH NO ISSUES. CIRC RATE OF 1.2 BPM, 3020-3100 PSI - PULLTO LINER TOP WITH ANOTHER HkVIS SWEEP COMING AROUND. APPROXIMATELY 80 PSI DROP WITH MILL COMING OUT OF APPROXIMATE LINER TOPAT 8530', ANOTHER 80 PSI DROP TO 2840 PSI AS HI -VIS PILL IS OUT OF BHA. 09:45 - 13:30 3.75 OTHCMP CLEAN COIL N DEAL 10,069.00 STAGE REEL, DROP 1/2" ALUMINUM BALL TO SHEAR CIRC SUB - CIRCULATE DOWN AT 1.2 BPM, 2850 PSI WHILE BHA IS ABOVE LINER TOPAT 8490' -BALL SEATED AND SHEARED AT 27 BBLS AWAY, 4200 PSI - INCREASE PUMPS TO 1.67 BPM AND BEGIN MOVEMENT BACK DOWN INTO DEPLOYMENT SLEEVE TO ENSURE IT IS CLEAN. COIL WEIGHT MOVING DOWN 3233K AT HIGHER CIRC RATES AND PRESSURES. NO ISSUES MOVING INTO SLEEVE AND PULLING BACKUP. NO NOTICEABLE DIFFERENCE IN PRESSURES ON MOVEMENT IN AND THEN BACK UP. - PICK UP CLEANING UP WELLBORE AT 1.70BPM,4000PSI. MWIN8.62PPGAND MW OUT 8.51 PPG. - INCREASE RATE TO 1.77 BPM IN, 1.62 BPM OUT, 4400 PSI, WHILE MOVING UP THROUGH 5-1/2" AREA - NOTHING TO NOTE ACROSS SHAKER - NO ISSUES PULLING TO SURFACE. FLOW CHECKAT SURFACE, ALL GOOD, _ NO FLOW. 13:30 - 1690 2.50 OTHCMP CLEAN COIL N DEAL 10,069.00 _ MAKE UP PUMP IN SUBAND PUMP FRESH WATER THROUGH WORK STRING. LD WORK STRING. RETRIEVE _ 1/2" BALL FROM CIRC_ SUB. 16.00 - 17:00 1.00 OTHCMP CLEAN COIL P CLEAR AND CLEAN RIG FLOOR - MOBILIZE PERF LIFT EQUIPMENT TO RIG FLOOR - CONDUCT BOP FUNCTION TEST WITH 2" AND 2-3/8" TEST JOINTS, ALL GOOD 17:00 - 18:00 100 OTHCMP PERFOB COIL P WSL VERIFY GUN LAYOUT MATCHES PERF MEMO. VERIFY XO FOR SAFETY JOINTAND LIFTING EQUIPMENT FITNESS. MU PERFORATION BHA - 1-9/16" JRC VANN GUNS, 6 SPF, 60° PHASING, 1.56" PERFECTA SHOT CHARGE. Printed 1116/2017 1:31:46PM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Common Well Name: 04-38 Event Type: COM- ONSHORE (CON) Start Date: 10/15/2017 Eno Dale: 10/22/2017 Project: Prudhoe Bay Site: PB DS 04 AFE No {3-018JR-O (1,134,044.00) Page 16 of 18 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usft (above Mean Sea Level) Date From - To Hrs Phase Task Unitor Code NPT NPT Description of Operations (hr) Rotary Depth 1800 - 1830 0.50 OTHCMP PERFOB COIL P KICK DRILL WITH MILLER CREW. CREW WAS IN TER PROCESS OF PICKING UPANOTHER PERF GUN. PERF GUN IS LAID BACK DOWN AND SAFETY JOINT IS RUN UP TO THE RIG FLOOR. CREW INSTALLS THE CROSSOVER AND SAFETY JOINTAND TORQUES IT UP. WELL SHUT IN IS SIMULATED FROM THIS POINT, DRILLER CORRECTLY IDENTIFIES SHUT IN SEQUENCE. WELL READY TO BE SHUT IN APPROXIMATELY 3 MIN. CONDUCT AAR WITH RIG CREW AND HES PERFORATING CREW. 18:30 - 2000 1.50 OTHCMP PERFOB O L P CONTINUE PICKING UP PERF GUNS. 2000 - 21:00 1.00 OTHCMP PERFOB T COIL P M/U REMAINING 1" CSH AND BHA. CHECK TORQUE ON FIRST AND LAST 1" CONNECTIONS, GOOD. MAKEUP INJECTOR, ON AT 21:00 21:00 - 2300 2.00 OTHCMP PERFOB COIL P RIH WITH PERFORATING BHA#7 -RATE: 0.42 BPM IN, 0.71 BPM OUT. CIRC PRESSURE: 810 PSI - MUD WEIGHT: 8.50 PPG IN, 8.48 PPG _ _ _ OUT 23:00 - 00:00 1.00 OTHCMP PERFOB COIL P WEIGHT CHECK AT LINER TOP IS 36K. VERIFY INJECTOR TRIP SETTINGS WITH DRILLER. RIH CAREFULLY PAST LINER TOP, NOTHING SEEN. 10/22/2017 00:00 - 01:00 1.00 OTHCMP PERFOB COIL P PICK UP TO SHOT DEPTH OF 9,718', PLACES BOTTOM SHOT AT 9,708'. PICK UP TO 9,649' AND WAIT FOR TOOL TO ACTIVATE. PUT 100 PSI ON WHP AND GET STEADY PUMP PRESSURE. TOOL IS OUT OF LOCKOUT AT 00:38. GO THROUGH MOVEMENT CYCLE TO ACTIVATE FIRING HEAD. AFTER MOVEMENT CYCLE COMPLETED _ MOVE TO SHOT DEPTH. 01:00 - 03:00 2.00 OTHCMP PERFOB COIL P GET GOOD SHOT INDICATION FROM FLUID LOSS AND LOSS OF WHP. NOT MUCH SEEN ON ACOUSTIC. POOH, CLEAN PICKUP. POOH < 50 FT/MIN, HOLD 250 PSI WHP WHILE INSIDE LINER. PULLABOVE LINER TOPAND CONDUCT 10 MIN PUMPS OFF FLOW CHECK, STATIC. CONTINUE POOH. PERFORATED INTERVALS: 8940'-9075' MD 9110'-9295' MD 9345'-9375' MD 9440'-9535'1013 9603'9708' MD *All depths reported in Drillers Depths* North America - ALASKA - BP Page 17 of 18 Operation Summary Report Common Well Name: 04-38 AFE No Event Type: COM- ONSHORE (CON) Start Date: 10/15/2017 End Dale. 10/222017 X3-018JR-C: (1,134,044.00) Project: Prudhoe Bay Site: PB DS 04 Rig Name/No.: CDR -2 Spud Date/time: 821/1991 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001143 Active datum: KB @53.00usR (above Mean Sea Level) Date From - To Hrs Phase Task Unit or Code NPT NPT Description of Operations _ (hr) _ Rotary _ Depth 03:00 - 04:00 1.00 OTHCMP PERFOB COIL P _ _ 10 MIN PUMPS OFF FLOWCHECKAT SURFACE IS GOOD, WELL STATIC. CONDUCT PJSM AND REVIEW PROCEDURE FOR LAYING DOWN 1" CSH. OPEN RISER AND INSPECT LAST 50 FT OF CT, NOTHING SEEN. LAY DOWN 2-1/16" CSH AND 6 JTS OF 1" CSH. 04:00 - 04:30 0.50 OTHCMP PERFOB COIL P WITH 10 JTS 1" CSH LEFT, CONDUCT KICK DRILL WITH JURY CREW. CREW BRINGS SAFETY JT TO RIG FLOOR AND TORQUES IT UP IN 2 MIN, WELL IS READY TO SECURE. CONDUCT AAR AFTERWARDS. SAFETY MEETING WITH HES AND NABORS CREW FOR LAYING DOWN PERF GUNS. 04:30 - 0830 4.00 OTHCMP PERFOB COIL P LAY DOWN REMAINING 1" CSH. LAY DOWN FIRING HEAD AND PERF GUNS. 08:30 - 0915 0.75 POST BOPSUR COIL P _ CLEAR AND CLEAN UP RIG FLOOR AND MOBILIZE PERF TOOLS OFF RIG 09:15 - 11:45 2.50 POST BOPSUR COIL P LITTLE RED LOAD 50 BBLS 80° DIESEL INTO REEL. RIG PUMPS TO CIRCULATE DOWN AND LAY IN FREEZE PROTECT FROM 2555'. X11:45 - 12:45 1.00 POST BOPSUR COIL P BREAK OFF NOZZLEASSEMBLY, INSTALL SPV INTO TREE, VERIFY SET. FLUID PACK WITH METHANOL, CLOSE IN MASTER VALVE. 12:45 - 13:30 0.75 POST BOPSUR COIL P HAMMER ON TWO EACH 1" CSH JOINTS THAT CAME FROM API YARD AND NOT RIH. DRIFTAND THEN HAMMER WITH BRASS HAMMER AS IF IN PREPARATION TO BE MADE UP AND RIH. COLLECT DEBRIS 13:30 - 17:30 4.00 POST RIGID COIL P E -LINE NOT VISIBLE TO CHECK CONDITION OF BOOT. STAB ON, PUMP FORWARD. E -LINE IS NOT VISIBLE. CUT COIL CONNECTOR OFF PLUS 2' OF COIL, E -LINE VISIBLE. CUT 2' MORE OF COIL, E -LINE AT END OF COIL. - STAB ON, PUMP BACK AT MAX RATE, NO MOVEMENT. FINALLY GET MOVEMENT ON THIRD TRY, PUMP UNTIL NO MOVEMENT. - POP OFF, CUT 281' OF COIL FOR TOTAL OF 265' OF COIL- 1.70% SLACK IN COIL - INSTALL NEW CONNECTOR, PULL TEST TO 50K 17:30 - 18:40 1.17 POST RIGID COIL P CONDUCT PJSM WITH RIG CREW AND HES N2 CREW. PUMP FRESH WATER AND CORROSION INHIBITOR INTO THE REEL, FOLLOWED BY 10 BELS MEOH. WSL PERFORM PRESSURE XCHECK VERIFICATION WITH HES NITROGEN SUPERVISOR, AND VERIFIES PUMP TRIPS WORKING. Printed 11/62017 1:31:46PM •AAI depths reported in Drillers Depths` Printed 11/8/2017 1:31:46PM •AII depths reported in Drillers Depths' North America - ALASKA - BP Page 18 of 18 Operation Summary Report Common Well Name: 04-38 AFE No Event Type: COM- ONSHORE (CON) Start Date: 10/15/2017 End Date: 10/2212017 X3-018JR-C: (1,134,044 00 ) Project: Prudhoe Bay - Site: PB DS 04 Rig Name/No.: CDR -2 Spud Date/time: 8/21/1991 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USAOOOOI143 _ Active datum: KB @53.00usft (above Mean Sea Level) Date From - To Hrs Phase Task Unit or Code NPT NPT Description of Operations (hr) _ _ Rotary 18:40 - 20:00 1.33 _Depth POST RIGID COIL P FINISHED WITH MEOH, LINE UP VALVES TO PUMP N2. PUMP N2 TO PURGE REEL. MAINTAIN 150 PSI DOWNSTREAM CHOKE PRESSURE. I USE RESIDUAL N2 PRESSURE TO PURGE SURFACE LINES OUT TO TIGER .TANK._ 20:00 - 23:59 3.98 POST RIGID COIL P USE 300 PSI COMPRESSOR TO PURGE ALL REMAINING SURFACE LINES. GREASE CHOKE AND STACK. PREP TO PULL CTACROSS. REMOVE INNER REEL HARDLINE. - AGREE WITH ODE TEAM TO RIG RELEASE AT MIDNIGHT DUE TO REEL SWAP REQUIRED FOR MOVING TO NEXT WELL Printed 11/8/2017 1:31:46PM •AII depths reported in Drillers Depths' 10/22/2017 TWO = 0/0/0. Set 4" ISA BPV #540 with T-Bar. RDMO. ***Job Complete*** TWO = BPV/0/0. (Post CDR-2). RD temp CDR #3 upper most tree from MV & RU upper production tree. PT'd 300 low / 5000 high, (PASSED). Charted and retained in TRP folder. Pulled 4" ISA BPV #540 @ 123". Hung "Wellbore or Annulus is Fluid Packed" tags. RDMO. 10/24/2017 ***JOB COMPLETE***. See log for details. FWHP's = VAC/0/0. T/1/0=5/12/22 Temp= S/I (LRS Unit 70-Assist Slickline: L&T/CTD) Pressure test liner lap - Failed. Unable to reach or maintain test pressure. Pumped 13 bbls total to establish LLR of 1.5 bpm @ 2350 psi. Tags hung. SL in control of well upon departure. IA OA=OTG. 10/25/2017 FWHPS=40/12/25 ***WELL FOUND S/I ON ARRIVAL*** (Post CTD) DRIFT W/ 2.70" CENT., 2.50" LIB & TAG DEPLOYMENT SLEEVE @ 8527' SLM BRUSH DEPLOYMENT SLEEVE 2.50" BRUSH @ 8532' SLM SET 3-1/2" LTTP IN 2.70" DEPLOYMENT SLEEVE @ 8527' SLM LRS MIT-T FAILED, LLR OF 1.15 BPM@ 2350 PSI PULL 3-1/2" LTTP FROM 2.70" DEPLOYMENT SLEEVE @ 8527' SLM 10/25/2017 ***CONT. ON 10/26/17 WSR*** T/I/0= 7/15/15 Assist Slickline. Pump 103 bbls crude down TBG to assist SLB set LTP. 10/26/2017 ***Job continues 10-27-17*** ***CONTINUE WSR FROM 10/25/17 SWCP 4518*** (Post CTD) SET WHIDDON CATCHER SUB ON 4-1/2" x 3-1/2" XO @ 5380' SLM PULL BK-DGLV FROM ST#2 @ 5278' MD SET BK-DGLV IN ST#2 @ 5278' MD ATTEMPT TO RETRIEVE CATCHER FROM 5380' SLM, HANG UP IN TRSV @ 2138' SLM, UNABLE TO PASS ATTEMPT TO PUMP FLAPPER OPEN W/ LRS, NO LUCK SHEAR GS, RESET CATCHER @ 5375' SLM ABLE TO WORK GS PAST TRSV WHILE LRS PUMPS. RAN 4-1/2" TRCF SSSV LOCK OUT TOOL TO 2141' SLM. (c/I lost 200 psi while attempting to lock out valve) RAN 4-1/2" TRCF SSSV LOCK OUT TOOL TO 2141' SLM. 10/26/2017 ***CONTINUE WSR TO 10/27/17*** ***CONTINUE WSR FROM 10/26/17 SWCP 4518***(ctd) RAN FLAPPER CHECKER TO TRSV(open). PULL BK-S/0 GLV FROM ST#2 @ 5263' SLM(5278' MD). SETBK-S/O GLV IN ST#2 @ 5263' SLM(5278' MD). PULL WHIDDON CATCHER FROM 5375' SLM. 10/27/2017 ***CONTINUE WSR TO 10/28/17*** T/I/0= 255/245/25 Temp= No FL. (assist slickline). RU and PT lines, SB for SL to pull catcher. 10/27/2017 ***WSR continued to 10/28/2017. JOB CONTINUES FROM 10-26-17 Assist Slickline. No fluids pumped. Bled back 1.3 10/27/2017 bbls crude from tb . SL in control of well at LRS departure. IA/OA=OTG. FWHP=5/117/19 Daily Report of Well Operations 04-38A ***CONTINUE WSR FROM 10/27/17 SWCP 4518***(ctd) DRIFT W/ 35KB PACKER & PTSA DRIFT TO 8530' SLM(shear gr). PULL 35KB PACKER & PTSA DRIFT FROM 8530' SLM SET (ONE TRIP) 35KB PACKER & PTSA w/ XX PLUG @ 8533' SLM (TOP OF LTP @ 8526' MD) min id = 1.781" LRS PERFORM PASSING CMIT-T x IA ATTEMPTED TO MIT -T (Failed) EQUALIZE 2 3/8" XX PLUG @ 8528' SLM PULLED 2 3/8" PLUG FROM 8528' SLM 10/28/2017 ***WELL LEFT S/I DSO NOTIFIED ON DEPARTURE*** ***WSR continued from 10/27/2017 (Assist SL) MIT -T FAILED, CMIT TxIA passed to 2284/2300. Pumped 3.8 bbls crude down Tbg. to reach test pressure. IA slowly tracked IAP, CM IT TxIA PASSED to 2284/2300 (2400 Max applied, 2160 Target.) Loss of 23/11 psi 1st 15 min. Loss of 16/10 psi 2nd 15 min. FWHP=600/300/25. Tags hung, Casing valves OTG 10/28/2017 S -Line on location upon departure. 'WELL S/I UPON ARRIVAL*** (post ctd) RAN FLAPPER CHECKER TO TRSV @ 2162' MD ... CONFIRMED OPEN SET 3-1/2" LTTP @ 8532' MD RAN 4-1/2" D & D HOLE FINDER, GOOD PRESSURE TEST @ 5251' SLM (5267' MID) ... SUSPECT S/O LEAKING SET 4-1/2" WHIDDON C -SUB @ 5405' MD PULLED BK-S/O @ 5278' MD SET BK-S/O @ 5278' MD LRS PERFORMED MIT -T ... PASSED PULLED 4-1/2" WHIDDON C -SUB @ 5405' MD 11/4/2017 ***CONT. ON 11/5/2017 WSR*** T/I/O= 328/398/30 Temp=Sl Assist S -Line (MIT -T 2400 psi) Pumped 3.5 bbls of 70* crude down TBG in effort to reach test pressure. Incidentally, IA tracked with TBG, TxIA 990/1020 psi.. Bled IAP down, TBG tracked, not a one way leak. Pumped 1 bbl of 70* crude while S- pine ran D&D hole finder. Station #2 is leaking. Pumped 1.2 bbls crude down TBG to set check screened orfice valve. Set looked good, follow up with MIT -T. MIT -T PASSED to 2563 psi, Max Applied Pressure = 2600 psi, Target Pressure = 2400 psi. Pressured TBG to 2600 psi with 2.3 bbls crude. TBG lost 24 psi in 1st 15 minutes and 13 psi in 2nd 15 minutes, for a total loss of 37 psi during 30 minute test. Bled TBG to 1400 psi, 11/4/2017 returned -1 bbl. HES in control of well upon LRS departure. Tags hung. T/I/O = 550/600/30. Temp = SI. T & IA FL (SL request). ALP = 600 psi, SI @ CV. Tbg FL @ -500'(8 bbls). IA FL @ surface. 11/4/2017 SV, WV, SSV = C. MV = C. IA, OA = OTG. 05:20 ***CONT. FROM 11/4/2017 WSR*** (post ctd) PULLED 3-1/2" LTTP @ 8532' MD 11/5/2017 ***JOB COMPLETE, WELL LEFT S/I, DSO TO FLOWBACK & TEST*** North America - ALASKA - BP Prudhoe Bay PB DS 04 04-38 04-38A 500292221001 Design: 04-38A Final Survey Report 19 October, 2017 BAF IGHES BAT GE company by BP BAKER Final Survey Report F�UGHES Grmmoa, Company: Norm America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 04 Well: 04-38 Wellbore: 04-38A Design: 04-38A Project Prudhoe Bay, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones Geo Datum: NAD27' OGP-Usa AK [4267'15864) Map Zone: NAD27.OGP-Usa AK/ Alaska zone 4[26734'1586, SRO PB DS 04, TRA 1-15 Site Position: From: Map Position Uncertainty: 0.00 usft Well 04-38, 04-38 Well Position -Ni 0.00 usft +E1 -W 0.00 usft Position Uncertainty 0.00 usft Wellbore 04-38A Northing: Easting: Slot Radius: Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: System Datum:N 10 5,953,265.350 usft 711,270 usft 0400 in Northing: 59526.750 usft Easting:712,164.070 usft Wellhead Elev1 20.98 usft Well 04-38 KB Q 53.00usft (04-38 ACTUAL) KB @ 53.00usft (04-38 ACTUAL) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Mean Sea Level Using Well Reference Point Using geodetic scale factor Latitude: Longitude: Grid Convergence: Latitude: Longitude: Ground Level: 70° 16'31.598 N 148° 17'27.907 W 1.61 ° 70° 16'21.228 N 148° 17'1.707 W • 18.88 usft Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGGM2017 11/1/2017 1776 81.00 57,491 Design 04-38A Audit Notes: Version: Phase: ACTUAL Tie On Depth: 6,605.70 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (°) 3202. 0.00 0.00 250.00 10/192017 10:46:34AM Page 2 COMPASS 5000.1 Build 81D BP ( 0 by Final Survey Report BA��r�IU` R BAT GE paoy Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 04 Well: 04-38 Wellbore: 04-38A Design: 04-38A Survey Program Date 10/19/2017 From To (usft) (usft) Survey (Wellbore) Tool Name 80.20 8,605.70 1 : Schlumberger GCT mullishot (04-38) GCT -MS 8,623.00 10,043.41 BHGE CTK MWD 3" (04-38A) MWD Survey Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Description Schlumberger GCT multishot MWD - Standarlt Well 04-38 KB @ 53.00usft (04-38 ACTUAL) KB @ 53.00usft (04-38 ACTUAL) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) 3202. 0.00 0.00 3202 -20.98 \0 0.00 5,952,236.750 712,164.070 0.00 80.20 0.07 181.79 80.20 27.20 0. 0.00 5,952,236.721 712,164.070 0.15 92.10 0.07 160.94 92.10 39.10 0. 0.00 5,952,236.707 712,164.072 0.21 103.90 0.07 125.63 103.90 5 . -0.05 0.01 5,952,236.696 712,164.081 0.36 117.30 0.07 88.56 117.30 64.3 -0.06 0.02 5,952,236.692 712,164.096 0.33 131.60 0.07 48.72 731.80 \12 60 -0.05 0.04 5,952,236.698 712,784.111 0.33 145.90 0.05 1.45 145.90 90 -0.04 0.05 5,952,236.710 712,164.117 0.36 160.30 0.05 310.72 160. 30 -0.03 0.04 5,952,236.720 712,164.113 0.30 174.60 0.05 262.55 1 . 0 60 -0.03 0.03 5,952,236.723 712,164.102 0.29 188.95 0.05 211.49 18 135.95 -0.03 0.02 5,952,236.717 712,164.092 0.30 203.30 0.07 152.35 203.3 150.30 -0.05 0.02 5,952,236.704 712,164.093 0.43 217.75 0.08 100.78 217.75 164.75 -0.06 0.04 5,952,236.695 712,164.108 0.46 232.15 0.08 58.54 232.15 179.15 -0.05 0.05 5,952,236.698 712,164.126 0.40 246.60 0.05 346.09 .60 193.60 -0.04 0.06 5,952,236.710 712,164.133 0.56 260.95 0.03 7.42 260.95 207.95 -0.04 0.06 5,952,236.715 712,164.128 0.43 275.35 0.07 1 9 275.35 222.35 -0.05 0.06 5,952,236.705 712,164.129 0.55 289.75 0.10 83 289.75 236.75 -0.05 0.07 5,952,236.700 712,164.146 0.68 304.20 0.08 4 304.20 251.20 -0.04 0.09 5,952,236.709 712,164.165 0.46 318.65 0.05 17.99 318.65 265.65 -0.03 0.10 5,952,236.723 712,164.169 0.49 333.10 0.03 257.86 333.10 280.10 -0.02 0.09 5,952,236.728 712,164.163 0.38 347.50 0.05 173.13 347.50 294.50 -0.03 0.09 5,952,236.721 712,164.160 0.39 V. Sec (usft) 0.00 001 0.01 0.01 0.00 -0.02 -003 -0.03 -0.02 -0.01 0.00 -0.01 -003 -0.04 -004 -0.04 -0.05 -0.07 -0.08 -0.08 erxrn 10/19/2017 10:46:34AM Page 3 COMPASS 5000.1 Build 81D by BP Final Survey Report �F�UGHES Ewmpany Company: North America -ALASKA -BP Local Co-ordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB Q 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth( TVD TVDSS NIS EIW Northing Easting DLag (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) 361.80 0.07 109.93 361.80 308.80 -0.04 0.1`0' 5,952,236.712 712,164.169 0.46 376.20 0.10 70.96 376.20 323.20 -0.04 0.14 5,952,236.714 712,164.190 0.44 390.80 0.07 26.36 390.60 337.60 -0.03 0.13` 5,952,236.726 712,164.205 0.49 405.00 0.02 314.92 405.00 352.00 -0.0 0.14 5,952,236.736 712,164.207 0.46 419.50 0.02 232.48 419.50 366.50 -0.02 0.13 5,952,236.736 712,164.203 0.18 433.90 0.05 154.01 433.90 380.90 .03 0.13 5,952,236.729 712,164.204 0.35 448.40 0.08 89.38 448.40 395.40 - 3 0.15 5,952,236.723 712,154.217 0.51 462.90 0.08 39.97 462.90 409.90 -0. 0.16 5,952,236.732 712,164.233 0.46 477.30 0.05 329.84 477.30 424. -0.01 0.17 5,952,236.745 712,164.236 0.55 491.60 0.03 232.16 491.60 438. -0.01 0.16 5,952,236.748 712,164.230 0.43 505.90 0.07 146.55 505.90 452.90 -0.02 0.16 5,952,236.738 712,164.232 0.52 520.20 0.08 89.86 520.20 4fi7.20 -0.02 0.18 5,952,236.732 712,164.247 0.50 534.40 0.10 49.68 534.40 1.40 -0.02 0.20 5,952,236.740 712,164.266 0.46 550.80 0.07 355.93 55 80 0.00 0.21 5,952,236.760 712,164.276 0.50 567.30 0.03 47.90 5 0 514.30 0.02 0.21 5,952,236.773 712,164.278 0.34 584.00 0.05 104.92 584. 531.00 0.02 0.22 5,952,236.774 712,164.288 0.25 600.80 0.10 83.36 600.8 547.80 0.02 0.24 5,952,236.779 712,164.308 0.42 617.60 0.12 39.0 617.60 564.60 0.04 0.26 5,952,236.800 712,164.332 0.30 634.40 0.08 359.51 634.40 581.40 0.07 0.27 5,952,236.826 712,164-342 0.46 651.30 0.03 7.99 51.30 598.30 0.08 0.27 5,952,238.842 712,164.342 0.30 668.20 0.05 ".80 668.20 615.20 0.09 0.28 5,952,236.852 712,164.348 0.19 685.10 0.12 4385 685.10 632.10 0.11 0.30 5,952,236.871 712,164.364 0.42 702.10 0.15 24)56 702.10 649.10 0.15 0.32 5,952,236.905 712,164.384 0.28 719.15 0.15 ,96 719.15 666.15 0.19 0.33 5,952,236.948 712,164.394 0.30 736.10 0.08 5.56 736.10 683.10 0.22 0.33 5,952,236.982 712,164,396 0.41 753.10 0.07 25.64 753.10 700.10 0.24 0.34 5,952,237.003 712,164.401 0.16 770.10 0.12 31.89 770.10 717.10 0.27 0.35 5,952,237.028 712,164.415 0.30 V. Sec (usft) -0.06 -0.10 -0.12 -0.12 -0.12 -0.12 -0.13 -0.15 -0.15 -0.15 -0.15 -0.16 -0.16 -0.20 -0.20 -0.21 -0.23 -0.26 -0.28 -0.29 -0.30 -0.32 -0.35 -0.37 -0.39 -0.40 -0.42 10/192017 10:46:34AM Page 4 COMPASS 5000.1 Build 81D BP by Final Survey Report BAT R GE -P., Company: North America - ALASKA - BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Pasting DLsg (usft) V) (°) (usft) (usft) (usft) (usft)usft ( ) (usft) (°/100usft) 787.20 0.18 21.29 787.20 734.20 a 31 05,952,237.069 712,164.433 0.39 804.30 0.20 5.43 804.30 751.30 0.36 0.3 5,952,237.124 712,164.444 0.33 821.50 0.18 359.67 821.50 768.50 0.42 0.39 5,952,237.181 712,164.445 0.16 838.70 0.17 7.82 838.70 785.70 047 0.39 5,952,237.233 712,164.447 0.16 855.90 0.18 19.52 855.90 802.90 0.52 0.40 5,952,237.284 712,164.458 0.22 873.10 0.23 23.53 873.10 820.10 .58 0.43 5,952,237.342 712,164.479 0.30 890.30 0.27 13.20 890.30 837.30 5 0.45 5,952,237.414 712,164.500 0.35 907.55 0.23 1.27 907.55 854.55 0. 0.46 5,952,237.488 712,164.508 0.38 924.75 0.20 6.26 924.75 87 0.79 0.46 5,952,237.553 712,164.510 0.21 942.00 0.20 23.65 942.00 889. 0.85 048 5,952,237.610 712,164.524 0.35 959.25 0.25 31.81 959.25 \923 5 0.91 0.51 5,952,237.671 712,164.554 0.34 978.50 0.32 25.12 976.50 0 0.98 0.55 5,952,237.748 712,164.592 0.45 993.85 0.32 14.50 993.8 5 1.07 0.58 5,952,237.839 712,164.622 0.34 1,011.15 0.28 14.17 1,05 1.16 0.61 5,952,237.928 712,164.642 0.23 1,028.50 0.23 25.19 1,0 0 975.50 1.23 0.63 5,952,238.001 712,164.665 0.40 1,045.80 0.27 32.95 1,045. 992.60 1.30 0.67 5,952,238.068 712,164.700 0.30 1,063.20 0.35 34.27 1,063.2 1,010.20 1.38 0.72 5,952,238.147 712,164.750 0.46 1,080.60 0.35 26.8 1,080.60 1,027.60 1.47 0.77 5,952,238240 712,164.802 0.26 1,098.00 0.30 18.48 1, 8.00 1,045.00 1.56 0.81 5,952,238.332 712,164.837 0.39 1,115.40 0.27 18.81 15.40 1,06240 1.64 0.64 5,952,238.415 712,164.863 0.17 1,132.80 0.30"DI 1,132.80 1,079.80 1.72 0.87 5,952,238.495 712,164.894 0.28 1,150.20 0.37 1,150.20 1,097.20 1.81 0.92 5,952,238.585 712,164.942 0.45 1,167.50 0.38 1,167.50 1,114.50 1.91 0.98 5,952,238.682 712,165.000 0.08 1,184.90 0.38 1,184.89 1,131.89 2.01 1.04 5,952,238.786 712,165.050 0.28 1,202.30 0.33 . 1,202.29 1,149.29 2.11 1.06 5,952,238.887 712,165.087 0.35 1,219.50 0.30 18.50 1,219.49 1,166.49 2.20 'Al 5,952,238.977 712,165.114 0.17 1,236.70 0.33 23.59 1,236.69 1,183.69 2.29 1.14 5,952,239.067 712,165.146 0.24 V. Sec (usft) -0.45 -049 -0.51 -0.53 -056 -060 -0.64 -0.68 -0.70 -0.74 -079 -0.85 -0.91 -0.97 -1.01 1.0i -1,15 -1 23 -1.30 -1.35 -1 41 -1.49 -1.58 -1.66 -1 73 -1.79 -1.85 10/192017 10:46:34AM Page 5 COMPASS 5000.1 Build 810 by BP Final Survey Report BA.1'1�1(UGHES 1 .GE -P-, Company: North America - ALASKA - BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM RSK - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVD55 NIS EIW Northing Eastin0 DLeg (usft) (°) (') (usft) (usft) (usft) (usft) (usR) (usft) (°NOOusR) 1,253.90 0.42 29.84 1,253.89 1,200.89 2.39 1'•,19 5,952,239.168 712,165.194 0.57 1,271.10 0.52 31.77 1,271.09 1,218.09 2.51 1:� 5,952,239.291 712,165.263 0.59 1,288.30 0.58 29.42 1,288.29 1,235.29 2.65 1.35 5,952,239.435 712,165.343 0.37 1,305.80 0.58 23.66 1,305.59 1,252.59 2. 81 1.43 5,952,239.594 712,165.416 0.34 1,322.80 0.53 24.35 1,322.79 1,269.79 2.96 1.49 5,952,239.748 712,165.480 0.29 1,340.00 0.52 29.57 1,339.99 1,286.99 .10 1.57 5,952,239.890 712,165.547 0.28 1,357.30 0.55 31.95 1,357.29 1,304.29 4 1.65 5,952,240.031 712,165.626 0.22 1,374.50 0.63 32.26 1,374.49 1,321.49 3, 1.74 5,952,240.184 712,165.716 0.47 1,391.70 0.68 32.31 1,391.69 1,338 3.55 1.85 5,952,240.353 712,165.816 0.29 1,408.90 0.73 33.65 1,408.89 1,355. 3.73 1.96 5,952,240.534 712,165.926 0.31 1,426.20 0.77 32.92 1,426.18 1,373.18 3.92 2.09 5,952,240.727 712,166.045 0.24 1,443.40 0.73 31.10 1,443.38 390.38 4.11 2.21 5,952,240.921 712,166.159 0.27 1,460.60 0.72 35.47 1,460.58 7.58 4.29 2.33 5,952,241.106 712,166.273 0.33 1,477.80 0.75 41.26 1,477 1, 78 4.46 2.46 5,952,241.282 712,166.405 0.47 1,495.00 0.82 43.09 1, 98 1,441.98 4.64 2.62 5,952,241.461 712,166.559 0.43 1,512.20 0.87 42.86 1,512. 1,459.18 4.82 2.79 5,952,241.651 712,166.726 0.29 1,529.40 0.92 43.24 1,529.3 1,476.37 5.02 2.98 5,952,241.853 712,166.904 0.29 1,546.60 0.95 44, 1,546.57 1,493.57 5.22 3.17 5,952,242.060 712,167.093 0.23 1,563.60 0.95 43.51 1,563.57 1,510.57 5.43 3.37 5,952,242.268 712,167.284 0.13 1,580.70 0.92 43.84 0.67 1,527.67 5.63 3.56 5,952,242.475 712,167.471 0.18 1,597.80 0.92 .36 1,597.77 1,544.77 5.82 3.78 5,952,242.874 712,167.660 0.24 1,615.00 0.95 4 9 1,614.96 1,561.96 6.01 3.96 5,952,242.869 712,167.862 0.30 1,632.20 0.98 52 1,632.16 1,579.16 6.19 4.19 5,952,243.058 712,168.080 0.36 1,649.50 1.05 8 1,649.46 1,596.46 6.37 4.44 5,952,243.243 712,168.324 0.59 1,666.65 1.17 61.87 1,666.60 1,613.60 6.54 4.72 5,952,243.421 712,168.605 0.93 1,683.80 1.25 64.51 1,683.75 1,630.75 6.70 5.04 5,952,243.593 712,168.923 0.57 1,701.00 1.27 65.44 1,700.95 1,647.95 6.86 5.39 5,952,243.762 712,169.262 0.17 V. Sec (usft) -1.94 -2.05 -2.17 -2.30 -2.42 -2.53 -2.66 -2.80 -2.95 -3.12 -3.30 -3.48 -3.65 -3.84 -4.05 4,2E -4.51 -477 -5.02 -5.27 -5 52 -578 -6.05 -6.35 -6.67 -7.03 -7.41 10/192017 10:46:34AM Page 6 COMPASS 5000.1 Build 81D by BP BA, ICER Final Survey Report IGHES company Company: North America - ALASKA - BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay ND Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey r W MD Inc AN (axlmuD) TVD TVDSS NIS EIW Northing Basting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°NOOusft) (usft) 1,718.20 1.28 67.81 1,718.14 1,665.14 702 5.74 5,952,243.924 712,169.608 0.31 -7.79 1,735.30 1.32 72.74 1,735.24 1,682.24 7.15 6.118 5,952,244.065 712,169.969 0.69 -8.18 1,752.50 1.35 79.74 1,752.43 1,699.43 7.24 649 5,952,244.171 712,170.355 0.96 -8.58 1,769.70 1.42 86.00 1,769.63 1,716.63 7.29 6.80 5,952,244.233 712,170.765 0.97 -8.98 1,786.85 1.50 80.55 1,788.77 1,733.77 7.30 7.34 5,952,244.258 712,177.207 0.82 -9.40 1,804.10 1.57 94.40 1,804.02 1,751.02 .28 7.80 5,952,244.251 772,171.863 0.72 -9.82 1,821.20 1.65 97.26 1,821.11 1,768.11 4 8.28 5,952,244.215 712,172.142 0.66 -10.25 1,838.40 1.72 99.27 1,838.30 1,785.30 7. 8.78 5,952,244.157 712,172.644 0.53 -1070 1,855.50 1.82 101.18 1,855.39 1,80 7.07 9.30 5,952,244.077 712,173.166 0.68 -11.16 1,872.70 1.92 102.66 1,872.59 1,819. 6.95 9.85 5,952,243.977 712,173.719 0.65 -11.63 1,889.90 1.95 103.63 11889.78 1,836.78 6.82 10.41 5,952,243.861 712,174.288 0.26 -12.12 1,907.00 2.02 102.86 1,906.87 853.87 6.68 10.99 5,952,243.741 712,174.868 0.44 -12.61 1,924.20 2.07 102.03 1,924.05 1.05 6.55 11.59 5,952,243.626 712,175.470 0.34 -13.13 1,941.10 2.05 102.92 1,9 1,8 6.42 12.18 5,952,243.512 712,176.067 0.22 -13.64 1,958.00 2.05 104.05 1,9 3 1,904.63 8.28 12.77 5,952,243.387 712,178.859 0.24 -14.15 - 1,974.80 2.05 105.10 1,974. 1,921.62 6.13 13.35 5,952,243.252 712,177.244 0.22 -14.64 1,991.70 2.03 106.07 1,991.5 1,936.51 5.97 13.93 5,952,243.107 712,177.828 0.24 -15.13 2,008.60 2.02 107.9 ,008.40 1,955.40 5.79 14.50 5,952,242.949 712,178.404 0.39 -15.61 2,025.55 2.00 108.39 2, 5.34 1,972.34 5.60 15.07 5,952,242.775 712,178.972 0.33 -16.07 2,042.50 2.00 109.68 42.28 1,989.28 5.40 15.62 5,952,242.593 712,179.535 0.06 -16.53 2,059.45 2.02 60 2,059.22 2,008.22 5.21 18.18 5,852,242.409 712,180.100 0.12 -16.99 2,076.45 2.02 10 2 2,076.21 2,023.21 5.01 16.75 5,952,242.225 712,180.670 0.06 -17.45 2,093.35 2.02 709 2,093.10 2,040.10 4.81 17.31 5,952,242.044 712,181.238 0.00 -17.91 2,110.30 2.03 .54 2,110.04 2,057.04 4.61 17.88 5,952,241.861 712,181.808 0.08 -18.37 2,127.20 2.00 109.38 2,126.93 2,073.93 4.41 18.44 5,952,241.679 712,182.374 0.18 -18.83 2,144.15 1.98 109.26 2,143.87 2,090.87 4.22 18.99 5,952,241.500 712,182.934 0.12 -19.29 2,161.10 1.97 109.05 2,160.81 2,107.81 4.02 19.54 5,952,241.324 712,183.491 0.07 -19.74 10/19/2017 10:46:34AM Page 7 COMPASS 5000.1 Build 810 by BP Final Survey Report BATCER S semi Pam Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP7 Survey MD Inc Azi (azimuth) TVD TVDSS N/5 E/W Northing Easgng OL99 V. Sec (usft) N V) (usft) (usft) (usft) (usft) (usft) (usft) (1OOusft) (usft) 2,178.00 1.95 108.56 2,177.70 2,124.70 3.84 20.08 5,952,241.153 712,184.044 0.15 -20.19 2,194.95 1.95 108.22 2,194.64 2,141.64 3.68 20.64 5,952,240.987 712,184.596 0.07 -20.64 2,211.85 1.97 107.95 2,211.53 2,158.53 3.48 21.18 ` 5,952,240.823 712,185.150 0.13 -21.10 2,228.80 1.97 107.88 2,228.47 2,175.47 3.30 21.74 5,952,240.660 712,185.709 0.01 -21.56 2,245.70 1.97 107.73 2,245.36 2,192.36 3.12 22.30 5,952,240.498 712,186.267 0.03 -22.02 2,252.65 1.98 107.78 2,262.30 2,209.30 .94 22.85 5,952,240.335 712,186.828 0.06 -22.48 2,279.60 1.98 107.69 2,279.24 2,226.24 23.41 5,952,240.173 712,187.391 0.02 -22.94 2,296.50 1.98 107.58 2,296.13 2,243.13 2. 23.97 5,952,240.011 712,187.852 0.02 -23.41 2,313.45 2.02 107.89 2,313.07 2,26 2.41 24.53 5,952,239.847 772,788.520 0.24 -23.87 2,330.40 2.05 107.44 2,330.01 2,277. 2.22 25.10 5,952,239.681 712,169.099 0.20 -24.35 2,347.30 2.03 106.85 2,346.90 2,283.90 2.05 25.68 5,952,239.520 712,189.678 0.17 -24.83 2,364.20 2.00 106.87 2,363.78 10.78 1.87 26.25 5,952,239.364 712,190.252 0.18 -25.30 2,380.95 2.00 106.98 2,380.5 2, .52 1.70 26.81 5,952,239.209 712,190.815 0.02 -25.77 2,397.80 2.00 107.30 2,3 2,3 6 1.53 27.37 5,952,239.052 772,191.382 0.07 -26.24 2,414.60 2.00 107.47 2,4 5 2,361.15 1.38 27.83 5,952,238.892 772,197.946 0.04 -26.71 2,431.50 1.98 107.50 2,431. 2,378.04 1.18 28.49 5,952,238.732 712,192.511 0.12 -27.17 2,448.45 1.83 108.77 2,447.98 2,394.96 7.00 29.04 5,952,238.571 772,193.066 0.32 -27.63 2,465.30 1.90 108.7 ,464.82 2,411.82 0.82 29.57 5,952,238.408 712,193.605 0.21 -28.07 2,482.25 1.90 108.59 2, 1.77 2,428.77 0.64 30.10 5,952,238.243 712,194.142 0.02 -28.51 2,499.15 1.93 108.84 98.66 2,445.66 0.46 30.64 5,952,238.077 712,194.682 0.18 -28.95 2,516.10 7.93 30 2,515.60 2,462.60 0.28 31.18 5,952,237.906 712,795.226 0.09 -29.39 2,532.95 1.93 11 2,532.44 2,479.44 0.08 37.71 5,952,237.729 712,195.766 0.19 -29.83 2,549.95 1.95 11 2,549.43 2,496.43 -0.12 32.25 5,952,237.540 712,196.309 0.24 -30.26 2,566.80 1.98 .70 2,588.27 2,513.27 -0.33 32.79 5,952,237.343 712,196.852 0.20 -30.70 2,583.80 2.00 112.46 2,583.26 2,530.26 -0.55 33.33 5,952,237.137 712,197.405 0.19 -31.14 2,600.75 2.02 112.79 2,600.20 2,547.20 -0.78 33.88 5,952,236.924 712,197.960 0.14 -31.57 2,617.75 2.03 113.06 2,617.19 2,564.19 -1.02 34.44 5,952,236.705 712,198.520 0.08 -32.01 10/192017 10:46.34AM Page 8 COMPASS 5000.1 Build BID 0b BP BAKER P Final Survey Report rjUGHES GC[wnpa ry Company: North America - ALASKA- BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 0438 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM RSK - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD (usft) 1°I 1') (usft) 2634.65 2.03 114.24 2,634.08 2,651.30 2.05 115.04 2,650.71 2,867.95 2.07 115.96 2,667.35 2,684.65 2.08 117.08 2,684.04 2,701.30 2.10 118.48 2,700.68 2,717.95 2.12 120.14 2,717.32 2,734.60 2.15 121.04 2,733.96 2,751.30 2.15 121.59 2,750.65 2,767.90 2.17 122.67 2,767.24 2,784.40 2.22 124.01 2,783.72 2,800.85 2.28 125.02 2,800.26 2,817.55 2.32 126.01 2,816.85 2,834.20 2.32 126.84 2,833.48 2,850.85 2.32 127.30 2,85 2,867.50 2.33 127.96 2,8 6 2,884.15 2.32 129.81 2,863. 2,900.80 2.28 131.73 2,900.0 2,917.45 2.25 134.0 ,918.67 2,934.10 2.23 136.02 2,933.30 2,950.80 2.27 136.16 49.99 712,203.967 0.43 -36.06 2,747.28 2,967.45 2.289831 5,952,233.586 2,988.83 2,984.10 2.252,983.26 783.85 4.68 3,000.80 2.25 712,205.065 2,999.95 3,017.45 2.253,016.59 -5.09 41.42 3,034.15 2.20 0.20 3,033.28 3,050.85 2.20 146.34 3,049.98 3,067.55 2.18 147.87 3,066.65 TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 2,581.08 -1.26 34.99 5,95$236.481 712,199.075 0.25 -32.45 2,597.71 -1.50 35.58 5,952,236.249 712,199.620 0.21 -32.87 2,614.35 -1.76 36.06 5,952,236.007 712,200.167 0.23 -33.29 2,631.04 -2.0 36.60 5,952,235.752 712,200.716 0.25 -33.70 2,847.88 -2.37 37.14 5,852,235.484 772,207.281 0.33 -34.11 2,664.32 .81 37.68 5,952,235.199 712,201.803 0.39 -34.51 2,680.96 3 38.21 5,952,234.899 712,202.346 0.27 -34.90 2,697.65 -3. 38.75 5,952,234.589 712,202.890 0.12 -35.30 2,714. -3.59 39.28 5,952,234.271 712,203.429 0.27 -35.68 2,730. -3.94 39.80 5,952,233.939 712,203.967 0.43 -36.06 2,747.28 -4.30 40.34 5,952,233.586 712,204.512 0.43 -36.43 783.85 4.68 40.88 5,952,233.214 712,205.065 0.34 -36.81 .48 -5.09 41.42 5,952,232.829 712,205.618 0.20 -37.18 2, 12 -5.50 41.96 5,952,232.438 712,206.167 0.11 -37.55 2,813.76 -5.91 42.50 5,952,232.041 712,206.714 0.17 -37.91 _ 2,830.39 -6.33 43.02 5,952,231.632 712,207.251 0.45 -38.26 2,847.03 -6.77 43.53 5,952,231.211 712,207.769 0.52 -38.59 2,863.67 -7.22 44.01 5,952,230.777 712,208.264 0.57 -38.89 2,880.30 -7.68 44.47 5,952,230.330 712,208.737 0.49 -39.16 2,896.99 -8.15 44.92 5,952,229.871 712,209.204 0.24 -39.43 2,913.63 -8.62 45.38 5,952,229.408 712,209.677 0.10 -39.70 2,930.26 -9.10 45.84 5,952,228.945 712,210.144 0.32 -39.96 2,946.95 -9.59 46.27 5,952,228.466 712,210.592 0.79 40.20 2,963.59 -10.11 46.68 5,952,227.965 712,211.011 0.69 4041 2,980.28 -10.63 47.06 5,952,227.452 712,211.407 0.45 -40.59 2,996.96 -11.16 47.42 5,952,226.935 712,211.785 0.39 -40.75 3,013.65 -11.69 47.77 5,952,226.409 712,212.147 0.37 -40.89 10/192017 10:46:34AM Page 9 COMPASS 5000.1 Build 610 by BP Final Survey Report �F�UGHES cEcwnoam Company. North America- ALASKA - BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey v MD Inc Azi (azimuth) TVD TVDSS NIS ErW Northing Easting DLeg V. Bac (usft) (°) (°) (usft) (usft) lush) (usft) (usft) (usft) (°/100usft) Waft) - 3,084.25 2.15 149.46 3,083.34 3,030.34 -12.23 48.10 5,952,225.879 712,212490 0.40 -41.01 3,100.95 2.13 151.31 3,100.03 3,047.03 -12.77 48.40 01 5,952,225.346 712,212.813 0.43 -41.72 3,117.70 2.13 152.29 3,116.77 3,063.77 -13.32 48.70 W 5,952,224.806 712,213.123 0.22 -41.21 3,134.40 2.13 152.88 3,133.45 3,080.45 -13.8748.98 5,952,224.264 712,213.424 0.13 -41,29 3,751.15 2.13 153.56 3,150.79 3,097.19 -14.43 49.27 5,952,223.718 712,213.720 0.15 -47.36 3,167.75 2.15 154.29 3,166.78 3,113.78 .99 49.54 5,952,223.167 712,214.008 0.20 -41.42 3,184.35 2.17 154.90 3,183.37 3,130.37 5 49.81 5,952,222.610 712,214.292 0.18 11,48 3,200.95 2.18 155.38 3,199.96 3,146.98 -16.1 50.07 5,952,222.046 712,214.573 0.13 31.54 3,217.65 2.20 155.40 3,216.65 3,16 -16.70 50.34 5,952,221.473 712,214.855 0.12 -41.59 3,234.35 2.17 155.59 3,233.33 3,180. -17.28 50.60 5,952,220.902 712,215.135 0.18 31.64 3,251.00 2.10 158.61 31249.97 3,196.97 -17.85 50.85 5,952,220.342 712,215.402 0.48 31.68 3,267.65 2.07 158.47 3,266.61 213.61 -18.41 51.08 5,952,219.789 712,215.650 0.44 3171 3,284.30 2.07 160.13 3,283.2 3, .25 -18.97 51.30 5,952,219.233 712,215.878 0.36 -4171 3,300.95 2.05 161.62 3,2 3,2 9 -19.54 51.49 5,952,218.673 712,216.090 0.34 -4170 3,317.65 2.05 163.18 3,3 8 3,263.58 -20.77 51.67 5,952,218.109 712,216.286 0.33 -41.68 3,334.25 2.03 163.66 3,333. 3,280.17 -20.67 51.84 5,952,217.548 712,216.471 0.16 -41.6, 3,350.75 1.98 164.70 3,349.6 3,296.66 -21.23 52.00 5,952,216.997 712,216.644 0.37 -41.60 3,367.10 1.97 166.0 ,366.00 3,313.00 -21.77 52.14 5,952,216.456 712,216.802 0.28 -41.55 3,383.55 1.98 188.30 3, .44 3,329.44 -22.32 52.28 5,952,275.810 712,216.953 0.09 -4149 3,399.95 1.98 166.66 98.83 3,345.83 -22.87 52.41 5,952,215.363 712,217.101 0.08 -41.43 3,416.45 1.98 .02 3,415.32 3,362.32 -23.43 52.54 5,952,214.812 712,217.246 0.08 -41.36 3,432.85 2.00 16 1 3,431.71 3,378.71 -23.98 52.67 5,952,214.261 712,217.390 0.12 -41.29 3,449.35 2.00 16 3,446.20 3,395.20 -24.55 52.80 5,952,213.704 712,217.536 0.06 31.22 3,465.75 1.98 .77 3,464,59 3,411.59 -25.10 52.93 5,952,213.154 712,217.683 0.12 -41.15 3,462.15 1.98 167.20 3,480.98 3,427.98 -25.65 53.06 5,952,212.605 712,217.826 0.09 -41.08 3,494.00 1.96 167.50 3,492.82 3,439.82 -26.05 53.15 5,952,212.211 712,217.926 0.20 -41.03 10 3l4" 10/192017 10:46:34AM Page 10 COMPASS 5000.1 Build 81D by BP Final Survey Report BAT(ER S Ec°mya ry company: North America - ALASKA - BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) SRO: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc AN (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (wtl) (usft) (usft) (usR) lush) (°1100usft( (usft) 3,498.65 1.95 167.62 3,487.47 3,444.47 -26.20 53.18 5,952,212.057 712,217.964 0.20 -41.01 3,515.05 1.85 168.22 3,513.86 3,460.86 -26.74 53.2 5,952,211.529 712,218.093 0.62 -40.94 1 3,531.45 1.75 168.05 3,530.25 3,477.25 -27.24 53.40 5,952,211.028 772,218.213 0.61 -40.86 3,547.85 1.72 167.76 3,546.84 3,493.64 -27.73 53.50 5,952,210.545 712,218.331 0.19 40.79 3,584.05 1.67 167.65 3,562.84 3,509.84 28.19 53.61 5,852,210.080 772,278446 0.31 40.73 3,580.35 1.55 167.70 3,579.13 3,526.13 .64 53.70 5,952,209.636 712,218.557 0.74 -4067 3,596.65 1.45 167.84 3,595.43 3,542.43 -2 53.79 5,952,209.222 712,218.659 0.61 -40.61 3,613.05 1.38 167.93 3,611.82 3,558.82 -29. 53.88 5,952,208.828 712,218.755 0.43 -40.56 3,628.45 1.37 168.81 3,628.22 3,57 -29.84 53.96 5,952,208.445 712,218.845 0.14 -40.50 3,645.75 1.37 170.28 3,644.51 3,591. -30.22 54.03 5,952,208.064 712,218.926 0.22 -40.43 3,662.15 1.27 169.44 3,860.91 3,607.91 -30.59 54.08 5,952,207.684 712,219.003 0.62 -40.37 3,678.50 1.18 168.15 3,677.25 24.25 -30.94 54.16 5,952,207.353 712,219.081 0.58 -40.32 3,694.90 1.15 168.79 3,693.6 3, .85 -31.26 54.23 5,952,207.029 712,219.157 0.20 -40.27 3,711.25 1.13 166.53 317 3,6 0 -31.58 54.29 5,952,206.712 712,219.229 0.73 -40.22 3,727.65 1.12 188.37 3,79 3,673.39 -31.90 54.36 5,952,206.398 712,219.303 0.06 -40.17 3,744.05 1.08 168.79 3,742. 3,889.79 -32.21 54.42 5,952,206.091 712,219.374 0.25 -40.12 3,760.45 1.03 168.46 3,759.19 3,706.19 -32.50 54.48 5,952,205.797 712,219.442 0.31 -4008 3,776.75 0.95 168.6 ,775.49 3,722.49 -32.78 54.54 5,952,205.523 712,219.505 0.49 -40.04 3,793.15 0.88 168.71 3,7 1.88 3,738.88 -33.04 54.59 5,952,205.268 712,219.564 0.43 40.00 3,809.55 0.85 188.72 08.26 3,755.28 -33.28 54.64 5,952,205.026 772,219.619 0.18 -39.96 3,825.95 0.62 .48 3,824.68 3,771.68 -33.51 54.68 5,952,204.793 712,219.669 0.24 -39.92 3,842.35 0.83 17 3,841.08 3,788.08 -33.75 54.71 5,952,204.560 712,219.711 0.76 -39.87 3,858.70 0.88 77 3,857.43 3,804.43 -33.89 54.75 5,952,204.320 712,219.752 0.31 -39.82 3,875.05 0.85 .07 3,873.77 3,820.77 -34.23 54.79 5,952,204.078 712,219.800 0.31 -38.78 3,891.45 0.77 168.24 3,880.17 3,837.17 -34.46 54.83 5,952,203.852 712,219.852 0.49 -39.74 3,907.85 0.68 168.18 3,906.57 3,853.57 -34,66 54.88 5,952,203.650 712,219.900 0.55 -39.71 3,924.25 0.65 166.02 3,922.87 3,869.97 -34.85 54.92 5,952,203.466 712,219.948 0.24 -39.69 1011912017 f0:46:34AM Page 11 COMPASS 5000.1 Build e1D BP BA ER by Final Survey Report F�UGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB Q 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04.38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting OLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/lo0usft) (usft) 3,940.65 0.63 165.44 3,939.37 3,886.37 -35.03 56 5,952,203.290 712,219.998 0.13 -39.67 3,958.95 0.63 166.46 3,955.67 3,902.87 -35.20 55.0` 5,952,203.117 712,220.046 0.07 -39.65 3,973.25 0.62 165.56 3,971.97 3,918.97 -35.37 55.05 5,952,202.946 712,220.094 0.09 -39.63 3,989.65 0.60 164.13 3,988.37 3,935.37 -35.5 55.10 5,952,202.779 712,220.144 0.15 -39.62 4,006.05 0.65 166.16 4,004.77 3,951.77 -35.71 55.14 5,952,202.607 712,220.195 0.33 -39.50 4,022.30 0.60 170.81 4,021.01 3,968.01 .89 55.18 5,952,202.435 712,220.235 0.44 -39.58 4,038.45 0.55 171.95 4,037.16 3,984.16 - 5 55.20 5,952,202.275 712,220.264 0.32 -39.54 4,054.65 0.57 164.33 4,053.36 4,000.36 -36. 55.24 5,952,202.122 712,220.301 0.48 -39.52 4,070.75 0.52 158.39 4,069.46 4,016. -36.35 55.28 5,952,201.978 712,220.354 0.47 -39.52 4,086.95 0.48 159.41 4,085.66 4,032. -36.48 55.33 5,952,201.848 712,220.408 0.25 -39.52 4,103.05 0.43 163.52 4,101.76 4,048.76 -36.60 55.38 5,952,201.728 712,220.453 0.37 -39.52 4,119.20 0.40 166.56 4,117.91 064.91 -36.71 55.41 5,952,201.616 712,220.486 0.23 -39.51 4,135.30 0.37 168.15 4,134.01 1.01 -36.82 55.43 5,952,201.511 712,220.513 0.20 -3949 4,151.45 0.33 171.62 4,15 4, 16 -36.92 55.45 5,952,201.414 712,220.533 0.28 -3948 4,167.55 0.32 173.92 4,1 6 4,113.26 -37.01 55.46 5,952,201.324 712,220.547 0.10 -39.46 4,183.70 0.32 173.52 4,182. 4,129.41 -37.10 55.47 5,952,201.235 712,220.560 0.01 -3944 4,199.85 0.35 171.93 4,198.5 4,145.56 -37.19 55.48 5,952,201.142 712,220.574 0.19 -39.42 4,216.00 0.37 172.9 4,214.71 4,161.71 -37.29 55.49 5,952,201.041 712,220.590 0.13 -39.39 4,232.20 0.33 174.99 4,230.91 4,177.91 -37.39 55.50 5,952,200.943 712,220.604 0.26 -39.37 4,248.35 0.32 177.20 47.06 4,194.06 -37.48 55.51 5,952,200.852 712,220.613 0.10 -39.34 4,284.50 0.33 .13 4,263.21 4,210.21 -37.57 55.51 5,952,200.761 712,220.619 0.07 -39.32 4,280.65 0.35 17 48 4,279.36 4,226.36 -37.67 55.52 5,952,200.665 712,220.626 0.14 -39.29 4,296.85 0.33 172/93 4,295.56 4,242.56 -37.76 55.53 5,952,200.570 712,220.038 0.20 -38.26 4,313.05 0.32 i -40 4,311.76 4,258.76 -37.85 55.54 5,952,200.480 712,220.656 0.14 -39.25 4,329.15 0.30 167.48 4,327.86 4,274.86 -37.94 55.56 5,952,200.395 712,220.677 0.13 -39.24 4,345.20 0.28 170.07 4,343.91 4,290.91 -38.02 55.58 5,952,200.316 712,220.695 0.15 -39.22 j 4,361.25 0.30 177.65 4,359.96 4,306.96 -38.10 55.59 5,952,200.236 712,220.706 0.27 -39.201 10/19/2017 10:46:34AM Page 12 COMPASS 5000.1 Build 81D by may_ BP '# BAKER 'Ijy� Final Survey Report F�UGHES 6Emmpany Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (0438 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCPt Survey r MD Inc An (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 4,377.35 0.30 181.47 4,376.06 4,323.06 -38.18 55.59 5,952,200.152 712,220.709 0.12 -39.18 4,393.55 0.32 180.41 4,392.26 4,339.26-38.27 55.5,8 5,952,200.064 712,220.710 0.13 -39.14 4,409.70 0.35 180.64 4,408.41 4,355.41 -38.36 55.58 5,952,199.970 712,220.712 0.19 -39.11 4,425.90 0.33 183.25 4,424.61 4,371.61 -38.48 55.58 5,952,199.874 712,220.711 0.16 -39.08 4,442.05 0.27 185.84 4,440.76 4,387.76 -38.54 55.58 5,952,199.789 712,220.707 0.38 -39.04 4,458.25 0.25 186.65 4,456.95 4,403.95 .62 55.57 5,952,199.716 712,220.701 0.73 -39.01 4,474.45 0.25 189.04 4,473.15 4,420.15 - 9 55.56 5,952,199.646 712,220.693 0.06 -38.97 4,490.65 0.27 189.97 4,489.35 4,436.35 -38. 55.55 5,952,199.573 712,220.683 0.13 -38.94 4,506.85 0.35 182.97 4,505.55 4,45 -38.85 55.54 5,952,199.486 712,220.677 0.55 -38.90 4,523.00 0.42 181.99 4,521.70 4,488. -38.96 55.53 5,952,199.377 712,220.675 0.44 -38.86 4,539.25 0.42 179.75 4,537.95 4,484.85 -38.07 55.53 5,952,199.258 712,220.877 0.10 -38.82 4,555.45 0.42 173.10 4,554.15 501.15 -38.19 55.54 5,852,199.140 772,220.887 0.30 -38.78 4,571.65 0.40 173.49 4,570.3 4, .35 -39.31 55.55 5,952,199.025 712,220.704 0.12 -38.76 4,587.90 0.40 174.47 4,5 4,5 0 -39.42 55.56 5,952,198.913 712,220.719 0.04 -38.73 4,604.10 0.37 175.68 4,6 0 4,549.80 -39.53 55.57 5,952,198.805 712,220.732 0.19 -38.70 - 4,620.30 0.33 177.55 4,619. 4,566.00 -39.63 55.58 5,952,198.706 712,220.740 0.26 -38.6-, 4,636.50 0.33 182.20 4,635.2 4,582.20 -39.72 55.58 5,952,198.613 712,220.743 0.17 -38.64 4,652.70 0.30 187.9 4,651.40 4,598.40 -39.81 55.57 5,952,198.524 712,220.738 0.27 -38.60 4,668.90 0.32 189.41 4, 7.60 4,614.60 -39.90 55.56 5,952,188.437 712,220.727 0.13 -38.56 4,685.10 0.35 187.18 83.80 4,630.80 -39.99 55.54 5,952,198.343 712,220.716 0.20 -38.52 4,701.00 0.33 .00 4,699.70 4,646.70 40.08 55.53 5,952,198.249 712,220.707 0.13 -38.47 4,716.80 0.30 19 4 4,715.50 4,662.50 40.17 55.52 5,952,188.163 712,220.694 0.24 -38.43 4,732.55 0.28 18 4,731.25 4,678.25 -40.25 55.50 5,952,198.085 712,220.679 0.13 -38.39 4,748.30 0.27 .89 4,747.00 4,694.00 -00.32 55.49 5,952,198.010 712,220.667 0.13 -38.35 4,764.20 0.28 187.21 4,762.90 4,709.90 -40.40 55.47 5,952,197.935 712,220.659 0.08 -38.31 4,780.10 0.28 188.33 4,778.80 4,725.80 40.47 55.46 5,952,197.857 712,220.651 0.03 -38.28 4,796.05 0.27 191.10 4,794.75 4,741.75 -40.55 55.45 5,952,197.782 712,220.640 0.10 -38.24 10/192017 10:46.34AM Page 13 COMPASS 5000.1 Build 81D b BP BA ER p Final Survey Report F�UGHES Company: Nor0l America - ALASKA - BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method; Minimum Curvature Design: 04-38A Database: EDM R5K-Alaska PROD -ANCPI Survey MD Inc ATI (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (•) (usR) (usft) (usft) (uslt) (usft) (usft) (°7100usft) (usft) 4,812.00 0.23 192.55 4,610.70 4,757.70 -40.62 55,44 5,952,197.713 712,220.628 0.25 -38.20 4,827.90 0.22 192.72 4,826.60 4,773.60 -40.68 554 5,952,197.652 712,220.616 0.06 -38.17 4,843.75 0.25 194.88 4,842.45 4,789.45 40.74 55.41 5,952,197.588 712,220.602 0.20 -38.13 4,859.65 0.32 192.07 4,858.35 4,805.35 40.8 55.39 5,852,197.511 712,220.586 0.45 -38.09 4,875.60 0.30 184.56 4,874.30 4,821.30 40.90 55.38 5,952,197.425 712,220.576 0.28 -38.05 4,892.70 0.27 181.10 4,891.40 4,838.40 .88 55.37 5,952,197.340 712,220.574 0.20 -38.01 4,909.90 0.25 183.44 4,908.60 4,855.60 7 55.37 5,952,197.262 712,220.573 0.13 -37.99 4,927.00 0.25 191.34 4,825.70 4,872.70 41. 55.36 5,952,187.188 712,220.566 0.20 -37.95 4,944.20 0.23 195.33 4,942.90 4,889. 41.21 55.34 5,952,197.118 712,220.551 0.15 -37.91 4,961.40 0.30 204.68 4,960.10 4,907. 41.29 55.32 5,952,197.043 712,220.525 0.48 -37.86 4,978.65 0.28 201.89 4,977.35 4,924.35 41.37 55.28 5,952,186.962 712,220.493 0.14 -37.80 4,995.90 0.25 196.44 4,984.60 941.60 -4144 55.26 5,952,186.886 712,220.469 0.23 -37.75 5,013.20 0.27 199.83 5,011.90 8.90 -41.52 55.23 5,952,186.811 712,220.446 0.15 -37.70 5,030.50 0.25 192.24 5,02 4, 20 -41.59 55.21 5,952,196.735 712,220.427 0.23 -37.65 5,047.80 0.25 191.84 5, 50 4,993.50 -41.66 55.19 5,952,196.660 712,220.413 0.01 -37.61 5,065.20 0.25 183.72 5,063. 5,010.90 -41.74 55.18 5,952,196.585 712,220.405 0.20 -37.58 5,082.50 0.30 171.23 5,081.2 5,028.20 -41.82 55.19 5,852,196.503 712,220.412 0.45 -37.58 5,099.80 0.30 167.07 ,098.60 5,045.60 -41.91 55.20 5,952,196.414 712,220.431 0.13 -37.54 5,117.10 0.28 163.03 5,115.80 5,062.80 42.00 55.23 5,952,196.331 712,220.456 0.17 -37.53 5,134.30 0.28 162.95 3.00 5,080.00 42.08 55.25 5,952,196.251 712,220.483 0.00 -37.53 5,151.70 0.30 .69 5,150.40 5,097.40 42.16 55.27 5,952,196.166 712,220.507 0.18 -37.52 5,169.20 0.32 18 2 5,167.90 5,114.90 42.25 55.30 5,952,196.075 712,220.533 0.15 -37.51 5,186.60 0.32 157 5,185.29 5,132.29 -42.34 55.33 5,952,195.984 712,220.566 0.22 -37.51 5,204.10 0.30 1 5 5,202.79 5,149.79 42.43 55.37 5,952,195.899 712,220.607 0.17 -37.51 5,221.50 0.28 45.40 5,220.19 5,167.19 42.51 55.41 5,952,195.825 712,220.654 0.27 -37.53 5,238.20 0.30 140.68 5,236.89 5,183.89 42.57 55.46 5,952,195.759 712,220.707 0.19 -37.56 5,254.70 0.30 142.25 5,253.39 5,200.39 42.64 55.51 5,952,195.693 712,220.762 0.05 -3258 1011912017 10.46:34AM Page 14 COMPASS 5000.1 Build 61D BP 0 by Final Survey Report BA,1�tt(U R BAT GEc ,,W Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easgng DLeg V. Sec (usft) (°) (°I (usft lush) (usft) (usft) (usft) Waft) (°/t00usft) (usft) 5,271.60 0.30 147.30 5,270.29 5,217.29 -42.71 55.57 5,952,195.622 712,220.815 0.16 -37.61 5,288.50 0.33 149.07 5,287.19 5,234.19 -42.79 55.6 5,952,195.544 712,220.866 0.19 -37.62 5,305.50 0.38 143.54 5,304.19 5,251.79 42.88 55.67 5,952,195.459 712,220.928 0.36 -3265 5,322.40 0.38 140.05 5,321.09 5,268.09 42.97 55.74 5,952,195.373 712,220.999 0.14 -37.69 5,339.40 0.33 142.04 5,338.09 5,285.09 -03.05 55.81 5,952,195.293 712,221.088 0.30 -37.72 5,356.30 0.28 142.02 5,354.99 5,301.99 .12 55.86 5,952,195.223 772,221.125 0.30 -37.75 5,372.95 0.28 138.90 5,371.64 5,318.64 8 55.92 5,952,195.162 712,221.179 0.09 -37.77 5,389.60 0.30 140.79 5,388.29 5,335.29 -43. 55.97 5,952,195.099 712,221.235 0.13 -37.80 5,406.30 0.33 144.99 5,404.99 5,351 43.32 56.03 5,952,195.028 712,221.292 0.23 -37.83 5,423.00 0.37 142.09 5,421.69 5,368. 43.40 56.09 5,952,194.947 712,221.355 0.26 -37.86 5,439.70 0.35 137.66 5,438.39 5,385.39 43.48 56.15 5,952,194.869 712,221.425 0.21 -37.90 5,456.40 0.33 137.16 5,455.09 402.09 -43.56 56.22 5,952,194.798 712,221.494 0.12 -37.93 5,473.10 0.32 139.07 5,471.79 8.79 -43.63 56.28 5,952,194.729 712,221.559 0.09 -37.97 5,489.80 0.30 142.63 5,4 5,4 9 43.70 56.34 5,952,194.661 712,221.618 0.17 -38.00 5,506.40 0.28 145.67 5,5 9 5,452.09 43.76 56.39 5,952,194.594 712,221.669 0.15 -38.02 _ 5,523.00 0.32 146.63 5,521. 5,468.69 43.84 56.44 5,952,194.524 712,221.720 0.24 -38.04 5,539.70 0.35 144.86 5,538.3 5,485.39 -43.92 56.49 5,952,194.444 712,221.777 0.19 -38.07 5,556.40 0.35 144.6 5,555.09 5,502.09 44.00 56.55 5,952,194.363 712,221.838 0.01 -38.09 5,573.15 0.33 148.15 5,518.84 44.08 56.61 5,952,194.282 712,221.895 0.17 -38.72 5,589.90 0.35 145.878.59 �5,11.84 5,535.59 44.17 56.66 5,952,194.200 712,221.952 0.14 -38.14 5,606.60 0.35 .015.29 5,552.29 -44.25 56.72 5,952,194.119 712,222.014 0.14 -38.17 5,623.40 0.33 74 6 5,622.09 5,569.09 -44.33 56.78 5,952,194.042 712,222.077 0.13 -38.20 5,640.20 0.32 145 5,638.89 5,585.89 -44.41 56.84 5,952,193.966 712,222.134 0.09 -38.22 5,656.90 0.32 .23 5,655.59 5,602.59 44.48 56.89 5,952,193.889 712,222.187 0.09 -38.24 5,673.70 0.33 149.71 5,672.39 5,619.39 -44.57 56.94 5,952,193.809 712,222.239 0.07 -38.26 5,690.50 0.35 147.35 5,689.19 5,636.79 -44.65 56.99 5,952,193.726 712,222.294 0.13 -38.28 5,707.30 0.33 146.27 5,705.99 5,652.99 -44.73 57.05 5,952,193.644 712,222.351 0.13 -38.31 10/192017 10:46:34AM Page 15 COMPASS 5000.1 Build 81D BP by Final Survey Report BAj{I(U(ER I asE-pany Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB Q 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Basting DLeg V. Sac (usft) V) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°AOOusft) (usft) 5,724.10 0.35 148.55 5,722.79 5669.79 -04.82 57.\\1yy0�� 5,952,193.562 712,222407 0.14 -38.33 5,741.00 0.38 153.02 5,739.69 5,686.69 -04.91 57.1 5,852,193.469 712,222.462 0.24 -38.34 5,757.80 0.43 151.40 5,756.49 5,703.49 -45.02 57.21 5,952,193.366 712,222.520 0.31 -38.36 5,774.60 0.47 150.94 5,773.28 5,720.28 -45.13 57.27 5,952,193.252 712,222.587 0.24 -38.38 5,791.50 0.53 153.05 5,790.18 5,737.18 -45.28 57.34 5,952,193.124 712,222.660 0.37 -38.40 5,808.30 0.58 152.38 5,806.98 5,753.98 .41 57.41 5,952,192.981 712,222.739 0.30 -38.42 5,825.15 0.58 154.90 5,823.83 5,770.83 -4 57.49 5,952,192.831 712,222.819 0.15 -38.44 5,842.00 0.55 155.62 5,840.68 5,787.68 -45. 57.56 5,952,192.682 712,222.892 0.18 -38.45 5,858.90 0.57 157.51 5,857.58 5,8 -45.86 57.63 5,952,192.532 712,222.962 0.16 -38.46 5,875.70 0.60 159.30 5,874.38 5,821. -46.02 57.69 5,952,192.375 712,223.030 0.21 -38.47 5,882.50 0.63 157.85 5,891.18 5,838.18 -06.19 57.75 5,952,192.209 712,223.100 0.20 -38.47 5,909.20 0.63 157.32 5,907.88 54.88 46.36 57.82 5,952,192.041 712,223.175 0.03 -3848 5,926.00 0.62 157.38 5,924.6 5, 1.68 -46.53 57.88 5,952,191.874 712,223.251 0.06 -38.49 5,942.95 0.62 159.40 5,9 5,8 3 -46.70 57.96 5,952,191.705 712,223.323 0.13 -38.48 5,959.85 0.65 160.58 5,9 2 5,905.52 -48.88 58.03 5,952,191.531 712,223.392 0.19 -3849 - 5,976.80 0.72 160.48 5,975. 5,922.47 -07.07 58.09 5,952,191.342 712,223.465 0.41 -38.45 5,993.70 0.90 161.77 5,992.37 5,939.37 -47.29 58.17 5,952,191.118 712,223.548 1.07 -38.48 6,010.50 1.17 162.3 ,009.17 5,956.17 -47.58 58.26 5,952,190.832 712,223.649 1.61 -38.48 6,027.20 1.37 162.10 6, 5.87 5,972.67 -47.83 58.38 5,952,190.483 712,223.772 1.20 -38.46 6,043.85 1.47 162.09 2.51 5,989.51 -48.33 58.50 5,952,190.094 712,223.910 0.60 -38.45 6,060.45 1.53 47 6,059.10 6,006.10 -46.74 58.64 5,952,189.686 712,224.058 0.37 -38.43 6,077.10 1.63 18 6,075.75 6,022.75 -49.17 58.79 5,852,189.256 712,224.221 0.63 -38.43 6,093.70 1.83 157 6,082.34 6,038.34 -49.64 58.97 5,952,188.795 712,224.415 1.31 -38.44 6,110.30 2.08 .91 6,108.93 6,055.93 -50.15 59.21 5,952,188.289 712,224.669 1.76 -38.49 6,126.85 2.27 148.44 6,125.57 6,072.57 -50.71 58.52 5,952,187.745 712,224.989 1.39 -38.58 6,143.55 2.38 14256 6,142.16 6,089.16 -51.28 59.87 5,952,187.181 712,225.358 0.81 -38.72 6,160.15 2.48 145.61 6,158.74 6,105.74 -51.87 60.26 5,952,186.605 712,225.762 0.78 -38.88 10119/2017 10:46.34AM Page 16 COMPASS 5000.1 Build 81D BP ( �y by Final Survey Report BA.ry11U` R aGl, m,, Company: Norm America - ALASKA - BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Basting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°HOOusft) (usft) 6,176.75 2.57 143.96 6,175.32 6,122.32 -52.46 60.88 5,952,186.020 712,226.200 0.70 -39.08 6,193.35 2.70 145.85 6,191.91 6,136.91 -53.09 61,7 5,952,185.408 712,226.656 0.94 -3927 6,209.95 2.92 146.57 6,20849 6,155.49 -53.77 8157 5,952,184.745 712,227.127 1.34 -39.47 8,228.55 3.10 144.44 6,225.08 6,172.06 -54.4 62.06 5,952,184.041 712,227.641 1.28 -39.69 6,243.10 3.18 143.71 6,241.59 6,188.59 -55.22 62.59 5,952,183.322 712,228.194 0.54 -39.93 6,259.65 3.30 143.46 6,258.11 6,205.11 .97 63.15 5,952,182.585 712,228.770 0.73 -40.20 6,276.15 3.50 145.63 6,274.58 6,221.56 7 63.72 5,952,181.805 712,229.359 1.44 -4046 6,292.60 3.87 145.81 6,291.00 6,238.00 -57. 64.31 5,952,180.948 712,229.979 2.25 -40.72 6,309.15 4.15 142.46 6,307.51 6,254. -58.58 64.99 5,952,180.031 712,230.684 2.21 -41.04 6,325.75 4.25 140.69 6,324.06 6,271. -59.53 65.75 5,952,179.100 712,231.466 0.99 -41.42 6,342.35 4.37 140.29 61340.62 6,287.62 -60.49 66.54 5,952,178.161 712,232.287 0.75 -41.84 8,358.95 4.58 740.89 8,357.17 304.17 -81.49 87.38 5,952,777.184 712,233.737 1.30 -4227 6,375.55 4.85 142.02 6,373.71 0.71 -62.56 68.21 5,952,176.141 712,234.016 1.72 -42.70 6,392.15 5.12 142.67 6,39 6, 25 -63.70 69.09 5,952,175.024 712,234.929 1.66 -43.14 6,408.80 5.23 142.00 6,4 3 6,353.83 -64.89 70.01 5,952,173.861 712,235.880 0.75 -43.60 6,425.45 5.32 141.07 6,423. 6,370.41 -66.09 70.96 5,952,172.690 712,236.865 0.75 -44.06 6,442.05 5.52 141.36 6,439.9 6,386.94 -67.31 71.95 5,952,171.496 712,237.882 1.22 -44.59 6,458.65 5.70 141.8 6,456.46 6,403.46 -68.58 72.95 5,952,170.253 712,238.924 1.13 -45.10 6,475.25 5.82 141.59 6,472.97 6,419.97 -69.89 73.99 5,952,168.975 712,239.992 0.75 -45.62 6,491.95 5.93 140.57 89.58 6,436.56 -71.22 75.06 5,952,167.676 712,241.103 0.91 -46.17 6,508.55 6.07 67 6,506.09 6,453.09 -72.55 76.17 5,952,166.376 712,242.253 1.02 -46.76 6,525.15 6.20 13 9 6,522.60 6,469.60 -73.90 77.32 5,952,165.059 712,243.441 0.79 -47.38 6,541.85 6.20 139 6,539.20 6,486.20 -75.28 78.49 5,952,163.718 712,244.648 0.16 -48.01 6,558.55 6.15 1 5 6,555.80 6,502.80 -76.65 79.65 5,952,162.381 712,245.847 0.30 -48.63 6,575.15 6.12 139.76 6,572.31 6,519.31 -78.00 80.80 5,952,161.060 712,247.030 0.18 -49.25 6,591.85 6.13 139.97 6,588.91 6,535.91 -79.37 81.95 5,952,159.730 712,248.217 0.15 -49.86 6,608.50 6.18 140.13 6,605.47 6,552.47 -80.73 83.09 5,952,158.395 712,249.401 0.32 -50.47 10/192017 10:46:34AM Page 17 COMPASS 5000.1 Build SID BP by Final Survey Report BA.ryy1U`GHES Company: North America - ALASKA - BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KS @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc. Azi(azimuth) TVD TVDSS NIS E/W Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (91OOusft) 6,625.20 6.22 140.07 6,622.07 6,569.07 -82.12 84,,`222555,,��� 5,952,157.044 712,250.597 0.24 6,641.90 6.23 139.99 6,638.67 6,585.67 -83.51 85.4p 5,952,155.690 712,251.798 0.08 6,658.25 6.22 141.60 6,654.92 6,601.92 -84.88 86.53 5,952,154.349 712,252.957 1.07 6,674.50 6.23 141.73 6,671.08 8,818.08 -86.26 87.63 5,952,152.998 712,254.089 0.11 6,690.75 6.23 140.12 6,687.23 6,634.23 -87.63 88.74 5,952,151.661 712,255.238 1.08 6,707.15 8.32 140.14 6,703.53 6,650.53 .01 89.89 5,952,150.318 712,256.426 0.55 6,723.55 8.42 140.58 6,719.83 6,666.83 - 1 91.05 5,952,148.950 712,257.625 0.68 6,739.95 6.53 141.02 6,736.13 6,683.13 -91. 92.22 5,952,147.551 712,258.834 0.74 6,756.35 6.67 141.56 6,752.42 6,69 -93.31 93.39 5,952,146.114 712,260.054 0.93 6,764.95 6.77 141.96 6,760.96 6,707. -94.10 94.02 5,952,145.341 712,260.899 1.28 8,766.85 6.62 142.05 61762.85 6,709.85 -94.28 94.14 5,952,145.188 712,260.827 3.01 6,785.70 6.95 143.00 6,781.56 728.56 -96.07 95.53 5,952,143.414 712,262.267 0.91 6,809.85 7.07 142.83 6,805.5 6, .53 -98.42 97.31 5,952,141.114 712,264.109 0.50 6,833.95 7.30 143.23 6,8 6,7 4 -100.83 99.12 5,952,138.757 712,265.989 0.98 6,858.55 7.62 145.60 6,8 3 6,800.83 -103.43 100.98 5,952,136.213 712,267.918 1.80 6,884.10 7.80 146.96 6,879. 6,826.15 -106.28 102.88 5,952,133.417 712,269.900 1.00 6,909.30 7.80 146.96 6,904.1 6,851.12 -109.15 104.74 5,952,130.604 712,271.845 0.00 6,934.55 8.03 147.8 ,929.13 6,876.13 -112.08 106.62 5,952,127.728 712,273.799 1.04 6,959.75 8.48 148.60 6, 4.07 6,901.07 -115.15 108.52 5,952,124.707 712,275.789 1.83 6,984.95 8.75 149.23 78.98 6,925.98 -118.39 110.47 5,952,121.530 712,277.828 1.13 7,010.05 8.93 53 7,003.79 6,950.79 -121.71 112.43 5,952,118.268 712,279.885 0.74 7,035.15 9.38 14 7 7,028.57 6,975.57 -125.14 114.47 5,952,114.893 712,282.020 1.82 7,060.30 10.02 14 7,053.36 7,000.36 -128.77 116.66 5,952,111.328 712,284.311 2.55 7,085.55 10.52 .93 7,078.20 7,025.20 -132.62 118.99 5,952,107.544 712,286.748 1.99 7,110.85 10.93 148.98 7,103.06 7,050.06 -136.65 121.42 5,952,103.580 712,289.288 1.62 7,136.05 11.37 148.82 7,127.78 7,074.78 -140.83 123.94 5,952,099.480 712,291.922 1.75 7,163.55 11.92 148.74 7,154.72 7,101.72 -145.57 126.81 5,952,094.816 712,294.932 2.00 V. Sec (usft) -51.08 -51.70 -52.28 -52.84 -5341 -54.02 -54.64 -55.24 -55.85 -56.16 -56.23 -56.91 -57.78 -58.66 -59.51 -60.35 -61.10 -61.85 -62.59 -63.32 -64.03 -64.77 -65.59 -66.46 -67.36 -68.30 -69.38 10/19/2017 10:46:34AM Page 18 COMPASS 5000.1 Build 81D BP by Final Survey Report BAiUGHES eE m Company: North America -ALASKA -BP Local Coordinate Reference: Well 04-36 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (0438 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 0438 North Reference: True Wellbore'. 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. See (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) usft)- (°/t00usft) (usft) 7,191.55 12.55 148.80 7,182.08 7,129.08 -150.65 129.89 5,952,089.831 712,298.150 2.25 -70.53 7,219.55 13.17 146.87 7,209.38 7,156.38 -155.98 133.1 5,952,084.592 712,301.523 2.21 -71.74 1 7,247.45 13.73 149.08 7,236.51 7,183.51 -161.54 13848 5,952,079.127 712,305.023 2.01 -72.98 7,275.35 14.22 149.48 7,263.59 7,210.59 -167.3 139.90 5,952,073.435 712,308.627 1.79 -74.23 7,302.65 14.43 149.65 7,290.04 7,237.04 -173.16 143.32 5,952,067.710 712,312.211 0.78 -75.46 7,330.05 14.45 149.69 7,316.57 7,263.57 .06 146.77 5,952,061.912 712,315.826 0.08 -76.68 7,357.45 14.40 149.62 7,343.11 7,290.11 -1 5 150.22 5,952,056.122 712,319.439 0.19 -77.91 7,384.85 14.27 149.31 7,369.66 7,316.66 -190. 153.67 5,952,050.378 712,323.049 0.55 -79.15 7,412.20 14.10 148.96 7,396.17 7,343. -196.54 157.11 5,952,044.725 712,326.647 0.70 -80.41 7,439.55 14.00 148.75 7,422.70 7,369. -202.22 160.54 5,952,039.141 712,330.240 0.41 -81,69 7,466.95 13.95 148.57 7,449.29 7,396.29 -207.88 163.98 5,952,033.589 712,333.840 0.24 -83.00 7,494.35 13.88 148.52 7,475.89 422.89 -213.50 167.42 5,952,028.068 712,337.435 0.26 -84.30 7,521.75 13.82 148.63 7,502.49 9.49 -219.09 170.84 5,952,022.570 712,341.011 0.24 -85.60 7,549.10 13.73 148.63 7,52 7, 06 -224.65 174.23 5,952,017.107 712,344.556 0.33 -86.89 7,576.50 13.67 148.39 7, 68 7,502.68 -230.19 177.62 5,952,011.672 712,348.101 0.30 -88.18 _ 7,603.90 13.68 148.10 7,582. 7,529.30 -235.70 181.03 5,952,006.262 712,351.663 0.25 -89.56 7,631.05 13.63 147.96 7,608.6 7,555.88 -241.13 184.42 5,952,000.923 712,355.209 0.22 -90.83 7,658.15 13.60 147.9 7,635.02 7,582.02 -246.54 187.81 5,951,995.615 712,358.746 0.12 -92.16 7,685.45 13.75 147.87 7,661.55 7,608.55 -252.01 191.24 5,951,990.247 712,362.330 0.55 -93.52 7,712.94 14.02 147.65 8.23 7,635.23 -257.59 194.76 5,951,984.769 712,366.005 1.00 -94.91 7,740.35 14.22 54 7,714.82 7,661.82 -263.23 188.34 5,951,979.227 712,369.746 0.74 -9635 7,767.85 14.32 14 4 7,741.47 7,688.47 -268.95 201.98 5,951,973.613 712,373.543 0.36 .97.81 7,795.30 14.33 147 7,768.06 7,715.06 -274.68 205.63 5,951,967.990 712,377.352 0.08 -99.28 7,822.65 14.27 1 4 7,794.57 7,741.57 -280.37 209.27 5,951,962.404 712,381.151 0.24 -100.76 7,850.15 14.15 47.08 7,821.22 7,768.22 -286.05 212.93 5,951,956.835 712,384.965 0.49 -102.25 7,877.55 13.95 146.75 7,847.80 7,794.80 -291.62 216.56 5,951,951.366 712,388.752 0.79 -10376 7,904.65 13.70 146.59 7,874.12 7,821.12 -297.03 220.12 5,951,946.058 712,392.461 0.93 -105.25 10/19201710:46.34AM Page 19 COMPASS 5000.1 Build BID BP by Final Survey Report BAFUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP7 Survey MD Inc An (azimuth) TVD TVDSS N/S E/W Northing Eastin9 DLeg V. Sec (usft) (°) C) lush) (usft) (usft) (usft) (waft) (usft) (°MOOusft) (usft) 7,931.65 13,37 146.53 7,900.37 7,847.37 -302.30 2234D 5,951,940.886 712,396.090 1.22 -106.72 7,958.55 13.07 146.45 7,926.56 7,873.56 -307.43 10226.9 5,951,935.855 712,399.629 1.12 -108.16 7,985.45 12.77 146.45 7,952.78 7,899.78 -312.44 230.32 5,951,930.938 712,403.093 1.12 -109.57 8,012.35 12.55 146.48 7,979.02 7,926.02 -317.36 233.57 5,951,926.116 712,406.487 0.82 -110.95 6,039.25 12.37 146.45 8,005.29 7,952.29 236.78 5,951,921.372 712,409.828 0.67 -112.30 8,066.20 12.22 146.39 8,031.62 7,978.62 239.95 5,951,916.683 712,413.136 0.56 -113.65 8,093.15 12.05 146.50 8,057.97 8,004.97 \-3 243.09 5,951,912.052 712,418.399 0.64 -114.96 8,119.65 11.88 146.69 8,083.89 8,030.89 246.11 5,951,907.553 712,419.552 0.68 -116.25 8,139.35 11.78 146.72 8,103.17 8,05 -339.66 248.33 5,951,904.241 712,421.863 0.51 -117.18 8,156.65 11.70 146.70 8,120.11 8,067, 342.60 250.26 5,951,901.355 712,423.877 0.46 -117.99 8,173.95 11.58 146.64 8,137.06 -345.52 252.18 5,951,898.494 712,425.876 0.70 -118.80 8,183.20 11.62 146.59 8,146.12 2 -347.07 253.20 5,951,896.970 712,426.943 0.45 -119.23 8,183.95 11.60 146.59 8,146.85 \UUU406 5 -347.20 253.28 5,951,896.847 712,427.030 2.67 -119.26 8,188.35 11.60 148.57 8,1 6 -347.94 253.77 5,951,896.122 712,427.538 0.09 -119.47 8,193.95 11.57 146.60 8,1 5 8,103.65 -348.88 254.39 5,951,895.202 712,428.183 0.55 -119.73 8,199.85 11.53 146.65 8,162. 8,109.43 -349.86 255.04 5,951,894.234 712,428.860 0.70 -120.00 8,205.79 11.55 146.65 8,168.2 8,115.25 -350.86 255.69 5,951,893.260 712,429.541 0.34 -120.27 8,211.79 11.65 146.6 ,174.13 8,121.13 -351.86 256.36 5,951,892.272 712,430.233 1.88 -120.55 8,217.80 11.67 146.55 8, 0.01 8,127.01 -352.88 257.03 5,951,891.277 712,430.931 0.37 -120.84 8,223.80 11.57 146.59 85.89 8,132.89 -353.88 257.69 5,951,890.268 712,431.625 1.67 -121.12 8,229.85 11.37 .83 8,191.82 6,138.82 -354.89 258.35 5,951,889.301 712,432.313 3.40 -121.39 8,235.85 11.22 14 5 8,197.70 8,144.70 -355.88 258.99 5,951,888.333 712,432.979 3.02 -121.66 8,241.95 11.17 147 8,203.69 8,150.69 -356.88 259.63 5,951,887.352 712,433.642 1.60 -121.91 8,247.75 11.17 .87 8,209.38 8,156.38 -357.83 260.23 5,951,886.418 712,434.267 0.30 -122.15 8,257.30 10.97 147.72 8,218.75 8,165.75 -359.38 251.20 5,951,884.895 712,435.288 2.12 -122.54 8,262.00 11.18 146.76 8,223.36 8,170.36 -360.14 261.69 5,951,884.150 712,435.797 5.95 -122.73 - 8,267.55 11.13 146.86 8,228.81 8,175.81 -W6 04 262.28 5,951,883.268 712,436.410 0.97 -122.98 107192017 10:46..34AM Page 20 COMPASS 5000.1 Build 81D BP by Final Survey Report BA, I1�(U R 1 aGE..,, Company: North America- ALASKA - BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey _ '�. MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Emoting DLeg V. Sec (usft) (°) N (usft) lush) (usft) (usft) (usft) (usft) (*1100usft) (usft) 8,273.04 11.10 146.99 8,234.19 8,181.19 -361.92 262,06 5,951,882.398 712,437.012 0.71 -123.22 81278.75 11.08 147.17 8,239.80 8,186.80 -362.85 263.4 5,951,881.493 712,437.635 0.70 -123.46 8,284.50 11.10 147.36 8,245.44 8,192.44 -363.78 264.05 5,951,880.580 712,438.259 0.72 -123.71 8,290.15 11.08 147.27 8,250.98 8,197.98 -364.69 264.64 5,951,879.683 712,438.872 0.47 -123.95 8,295.90 11.02 147.14 8,256.63 8,203.63 265.24 5,951,878.773 712,439.494 1.13 -124.19 8,301.80 10.97 147.27 8,262.42 8,209.42 265.84 5,951,877.845 712,440.130 0.95 -12444 8,308.70 10.95 147.32 8,269.19 8,216.19 \-36 266.55 5,951,876.762 712,440.870 0.32 -12473 8,312.15 10.80 147.34 8,272.58 8,219.58 266.91 5,951,876.221 712,441.238 1.45 -124.87 8,325.29 10.68 147.58 8,285.49 8,23 -370.29 268.23 5,951,874.186 712,442.619 1.71 -125.41 8,339.70 10.50 147.90 8,299.65 8,246. 372.53 269.64 5,951,871.987 712,444,095 1.31 -125.97 8,354.10 10.37 148.15 8,313.81 8,260.81 -374.74 271.02 5,951,869.815 712,445.538 0.96 -126.51 8,368.50 10.28 148.29 8,327.98 74.98 -376.94 272.38 5,951,887.880 712,448.959 0.65 -127.04 8,382.90 10.23 148.29 8,342.1 8, .15 -379.12 273.73 5,951,865.518 712,448.367 0.35 -127.56 8,397.30 10.20 148.25 8,3 8,3 2 -381.29 275.07 5,951,863.385 712,449.771 0.21 -128.08 8,411.75 10.15 148.37 8,3 8,317.54 -383.46 276.42 5,951,861.252 712,451.172 0.38 -128.59 8,426.20 10.12 148.59 8,384. 6,331.77 -385.63 277.74 5,951,859.123 712,452.562 0.34 -129.10 8,440.60 10.05 148.82 8,398.95 8,345.95 -387.78 279.05 5,951,657.006 712,453.932 0.56 -129.60 8,455.10 9.98 149.0 ,413.23 8,360.23 -389.94 280.36 5,951,854.884 712,455.294 0.53 -130.08 8,469.50 9.93 149.16 8, 7.41 8,374.41 -392.08 281.64 5,951,852.785 712,456.633 0.39 -130.55 8,485.40 9.85 149.31 43.07 8,390.07 -394.43 283.03 5,951,850.479 712,458.096 0.53 -131.06 8,502.70 9.73015 8,460.12 8,407.12 -396.96 284.52 5,951,847.985 712,459.656 0.88 -131.59 8,519.85 9.70 8,477.03 8,424.03 -399.47 285.96 5,951,845.518 712,461.168 0.54 -132.09 8,531.00 9.70 8,488.02 8,435.02 -401.11 286.89 5,951,843.909 712,462.137 0.48 -132.40 7 818" 8,537.00 9.70 V150.87 8,493.93 8,440.93 -401.99 287.38 5,951,843.041 712,462.655 0.48 -132.56 8,554.10 9.77 151.68 8,510.78 8,457.78 -404.53 288.77 5,951,840.546 712,464.116 0.90 -133.00 8,571.30 9.90 152.27 8,527.73 8,474.73 407.12 290.15 5,951,837.992 712,465.569 0.96 -133.41 10/192017 10:46:34AM Page 21 COMPASS 5000.1 Build 81D BP by BAT Final Survey Report GHES GE-,,,, Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 04 Well: 04-38 Wellbore: 04-38A Design: 04-38A Survey NIS MD Inc E/Vd (usft) V) Northing 8,588.50 10.03 8,605.70 10.10 TIP (waft) 8,623.00 10.13 KOP-INS 291.53 8,642.17 14.83 Interpolated Azimuth -412.42 8,670.39 24.73 Interpolated Azimuth 8,700.31 Interpolated Azimuth 8,730.15 8,763.90 8,790.35 8,820.19 8,850.10 8,880.10 8,910.12 8,940.29 8,970.11 9,000.53 9,030.36 9,060.41 9,090.31 9,120.39 9,150.41 9,180.40 9,210.53 Azi(azimuth) TvD V) (usft) 15246 8,544.67 152.46 8,561.61 152.51 8,578.64 137.69 8,597.35 127.75 8,623.88 32.37 122.54 8,650.15 39.62 119.42 81674.28 48.04 109.04 8,698.64 52.64 107.94 8,715.51 55.54 119.67 8,733 59.63 132.48 8,7 3 63.62 144.06 8,763. 69.06 152.40 8,775.4 79.48 144.4 8,783.66 85.54 137.34 8,787.55 85.88 135.21 89.83 86.25 .12 8,791.88 87.76 15 6 8,793.46 88.16 187 8,794.52 88.59 7 1 8,795.38 88.10 189.17 8,796.25 89.54 199.03 8,796.87 89.20 207.07 8,797.20 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: TVDSS NIS V. Sec E/Vd (usft) Northing (waft) (usft) 712,467.023 (usft) -133.80 (waft) 8,49167 -409.76 -134.20 291.53 712,469.966 5,951,835.396 8,508.61 -412.42 712,472.490 292.911 5,951,832.771 8,525.64 -415.12, -140.28 ` 294.32 712,491.727 5,951,830.117 8,544.35 L8.43 712,659.357 `296.76 31.04 5,951,826.874 8,570.88 , -42% 303.87 -266.68 5,951,820.776 36.51 -276.52 712,715.488 8,597\-432.88 -281.01 712,725.538 315.59 35.25 5,951,812.957 8,621.28` -441.87 35.29 330.64 712,729.313 5,951,804.402 645.84 -451.28 712,722.839 351.94 33.22 5,951,795.598 2.51 -457.72 26.71 371.25 5,951,789.696 8, 05 -467.49 393.27 5,951,780.554 8,696.13 -482.36 413.57 5,951,766.265 8,710.42 -502.04 431.06 5,951,747.087 8,722.48 -525.40 445.48 5,951,724.142 8,730.66 -550.05 460.70 5,951,699.932 8,734.55 -572.95 479.35 5,951,677.567 8,736.83 -594.87 500.31 5,951,656.247 8,738.88 -617.86 519.15 5,951,633.806 8,740.46 -644.16 533.50 5,951,607.914 8,741.52 -672.53 542.75 5,951,579.821 8,742.38 -702.30 546.67 5,951,550.176 8,743.25 -732.20 544.84 5,951,520.235 8,743.87 -761.24 537.55 5,951,490.999 8,744.20 -788.95 525.76 5,951,462.979 Well 04-38 KB @ 53.00usft (04-38 ACTUAL) KB @ 53.00usft (04-38 ACTUAL) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Easting DLeg V. Sec -159.57 (usft) (Woueft) (usft) -176.37 712,467.023 0.78 -133.80 -192.31 712,468.487 0.41 -134.20 -209.66 712,469.966 0.18 -134.60 -223.65 - 712,472.490 29.48 -135.75 -233.35 712,479.782 36.93 -140.28 -238.91 712,491.727 26.83 -146.51 -244.79 712,659.357 712,507.016 25.05 -159.57 712,528.573 32.74 -176.37 712,548.054 17.68 -192.31 712,570.346 33.26 -209.66 712,591.055 38.62 -223.65 - 712,609.087 36.45 -233.35 712,624.159 31.22 -238.91 712,640.073 42.92 -244.79 712,659.357 31.04 -254.48 712,680.932 7.07 -266.68 712,700.405 36.51 -276.52 712,715.488 35.38 -281.01 712,725.538 35.25 -280.00 712,730.292 35.29 -273.50 712,729.313 37.86 -261.56 712,722.839 33.22 -244.77 712,711.838 26.71 -224.22 10/192017 10:46:34AM Page 22 COMPASS 5000.1 Build 81D by BP Final Survey Report BA UGHES a GEmMpany Company: North America - ALASKA - BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB @ 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc AN (azimuth) TVD TVDSS NIS EM/ Northing Easting DLeg V. Sec (usft) (1) (1 (ase) (usft) (usft) (usft) (usft) (usft) (.1100usft) (usft)- 9,240.03 88.31 218.31 8,797.84 8,744.84 -813.73 509.86 5,951,437.760 712,696.641 38.21 -200.80 9,269.43 90.89 227.01 8,798.05 8,745.05 -835.32 4899 5,951,415.612 712,677.357 30.86 -174.71 9,299.74 89.57 228.44 8,797.93 8,744.93 -855.71 467.3 5,951,394.601 712,655.516 6.42 -146.66 9,330.04 89.75 227.98 8,798.11 8,745.11 -875.90\401,67 444.94 5,951,373.781 712,633.504 1.63 -118.53 9,380.16 91.35 225.89 8,797.82 8,744.82 96.47422.94 5,951,352.606 712,612.092 8.74 -90.82 9,390.18 93.16 224.44 8,796.64 8,743.64 - .62 5,951,330.868 712,591.427 7.72 -63.60 9,421A9 92.27 222.98 8,795.17 8,742.17 - 1 380.26 5,951,307.885 712,570.664 5.51 -35.83 9,449.95 91.26 224.53 8,794.28 6,741.28 -960. 360.38 5,951,286.571 712,551.379 6.43 -10.05 9,480.91 90.68 226.73 8,793.76 8,74 -982A1 338.26 5,951,264.311 712,529.872 7.35 18.15 9,510.68 89.82 228.28 8,793.63 8,740. 002.52 316.31 5,951,243.592 712,508.500 5.95 45.65 9,540.17 88.06 230.48 8,794.17 8,741.17 -1,021.72 293.93 5,951,223.776 712,486.673 9.55 73.24 9,570.90 86.93 230.87 8,795.52 742.52 -1,041.17 270.18 5,951,203.660 712,463.483 3.89 102.21 9,604.17 86.25 233.33 6,796.9 8, .92 -1,061.59 243.95 5,951,182.513 712,437.844 8.39 133.84 9,630.65 90.52 234.41 817 8,7 0 -1,077.20 222.57 5,951,166.306 712,416.909 9.49 159.28 9,660.36 91.63 236.98 8,7 8,743.64 -1,093.94 198.03 5,951,148.882 712,392.856 9.42 188.06 9,690.47 92.89 238.36 8,795. 8,742.45 -1,110.03 172.61 5,951,132.082 712,367.900 6.20 217.45 9,720.43 94.39 240.00 8,793.5 8,740.55 -1,125.35 146.94 5,951,116.047 712,342.668 7.41 246.81 9,750.43 95.87 241.9 ,790.87 8,737.87 -1,139.85 120.81 5,951,100.818 712,316.965 8.11 276.32 9,779.67 98.50 246.59 8,7 7.21 8,734.21 -1,152.44 94.69 5,951,087.492 712,291.210 18.16 305.18 9,810.27 99.94 248.07 82.31 8,729.31 -1,164.08 66.82 5,951,075.070 712,263.681 6.70 335.35 9,840.35 101.75 .82 8,776.65 8,723.65 -1,174.70 39.26 5,951,063.684 712,236.425 8.30 364.88 9,870.70 103.48 25 8 8,770.02 8,717.02 -1,184.34 11.26 5,951,053.255 712,208.710 9.49 394.49 9,902.07 103.57 25 8,762.68 8,709.68 -1,192.84 -18.03 5,951,043.938 712,179.674 10.20 424.92 9,930.95 103.49 .11 8,755.92 8,702.92 -1,199.25 -45.36 5,951,036.755 712,152.534 8.89 452.80 9,960.37 103.83 261.73 8,748.97 8,695.97 -1,204.25 -73.51 5,951,030.960 712,124.547 12.01 480.95 9,990.98 103.88 264.90 8,741.64 8,688.64 -1,207.71 -103.02 5,951,026.671 712,095.144 10.06 509.87 10,020.51 104.79 264.54 8,734.33 8,681.33 -1,210.35 -131.51 5,951,023.236 712,066.742 3.30 537.54 10/19/2017 10.46:34AM Page 23 COMPASS 5000.1 Build 81D •,S BP -,, by Final Survey Report BA{{�(U R aGE�w, Company: North America - ALASKA -BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: KB C 53.00usft (04-38 ACTUAL) Site: PB DS 04 MD Reference: KB @ 53.00usft (04-38 ACTUAL) Well: 04-38 North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A Database: EDM R5K - Alaska PROD - ANCP7 Survey ....Y MD Inc Azi (azimuth) TVD TVDSS NIS EAN Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft)usft ( ) (usft) (°1100usk) (usft) 10,043.41 105.13 263.80 8728.42 8,675.42 -1,212.59 53-R 5,951 020 370 712,044.806 3.46 558.99 10,069.00 105.13 263.80 8,721.74 8,668.74 -1,215.26 ® -178. 5,951,017.010 712,020.334 0.00 582.98 Projection to TD - 2 318" ` 10,069.00 8,721.74 2 3/8" 3.000 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) lush) (usft) lush) Comment 8,605.70 8,561.61 -412.42 292.92 TIP 8,623.00 8,578.64 -415.12 294.32 P WS 8,892.17 8,597.35 -418.43 298.76 , polated th 8,670.39 8,623.88 -424.73 3 .87 In fated Azimuth 8,700.31 8,650.15 -432.88 59 Inter ted Azimuth 10,069.00 8,72174 _ -1,215.26 _ -178.008 Prciectillin to TD Prepared By: Yosha Baker Hughes a GE 101192017 10 4634A Page 24 COMPASS 5000.1 Build 81D ProjW: Prudhoe Bay Site: P80304 1- WWI: 0433 0p WWlbara: 0438A N oasign:0433A(04,wo4 A) eYYYWI m..�nivm� Mm WELLBORE DETAILS: M -38A BBBBENCEfNIGYMIx 0 WA Gaam(wt7mi.eu. wxia �e inexMn yW �mNxaeeme x3®SI NuN,W.Y FCiMel, fm say fysl eioim. su-,o aox.o a[I TO m M0: 8605.)8 Mes�ee 09U P.r/a x. w Paxmk) 04-41/04-41AP81 CioJi'nn AWbf'. MnmaneuMue W N N tl q c J 5951470 O 5951400 O O O O O O O 5952380 5951120 - -. - - .. ..-• 5952310 - 5952240, 5952170 5952100 5952030 5951930 04-38AACTUAL 5951890 5951820 C 595,750'. u, G595, 680 005951610 e Sss154o 0 Z 5951470 595,400 5951330 5951260 5951190 5951120 59510.50 /04-38/N-3�8A; 595m 04-47/0447 599910 Tom— - O N N W VO O O O O O O O O O O O r0 O O O KB@53.00Ms3(04-38ACTUAL) eYYYWI m..�nivm� Mm WELLBORE DETAILS: M -38A BBBBENCEfNIGYMIx 0 WA Gaam(wt7mi.eu. wxia �e inexMn yW �mNxaeeme x3®SI NuN,W.Y FCiMel, Parent Woure: 0438 say fysl eioim. su-,o aox.o a[I TO m M0: 8605.)8 Mes�ee 09U P.r/a x. w Paxmk) 04-41/04-41AP81 CioJi'nn AWbf'. MnmaneuMue W Post Drilling EBsting (70 usftlin) J V J NJ WtW4.1� O O O O O O O O O O / O �O 04-38/0438 04-07/04-07PB1 EBsting(70 usiUin) J V N O O O O O O J BA ER F�UGHES GEt.,, N fJ N O N N fJ O W fNu e J A N U fmii O O O O D O 5952310 04-08/04-08 i 5%2240 5952170 5952400 .595254 O :5951960 04-41/04-41A'-," 15951820 04-01/04-41042 Z 1, 59517W 04-41/04.41,' 04-41 ro4.41A : 5951680m 04-41/04-41AP81 5951610= c 5951540 5951470 5951400 5951330 595126D 5951190 5951120 \09/04-09 5961050 5950980 04-09/04-09PBI -\ North America - ALASKA - BP Prudhoe Bay PB DS 04 04-38 04-38A 04-38A Anticollision Summary Report 19 October. 2017 BA < E FZ 1-'UGHES AW a GE company 10 zl-�OGCC Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 04 Site Error: 0 oousft Reference Well: 04-38 Well Error: 0.0ousft Reference Wellbore 04-38A Reference Design: 04-38A BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: BA EH hlUGHES Well 04-38 KB @ 53.00usft (04-38 ACTUAL) KB @ 53.00usft (04-38 ACTUAL) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 04-38A Filter type: NO GLOBAL FILTER: Using user defined selection 8 filtering criteria WARNING: There is hidden tightdate in this project Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 10/19/2017 From To (usft) (usft) Survey (Wellbore) Tool Nam 80.20 8,605.70 1 . Schlumberger GCT multishot (04-38) GCT -MS 8,623.00 10,043.41 BHGE CTK MWD 3" (04-38A) MWD Description Schlumberger GCT multishot MWD- Standard Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) PB DS 04 04-07 - 04-07 - 0407 3,512.29 3,500.00 287.60 83.31 224.34 Pass - Major Risk 04-07 - 04-07PB1 - 04-07PBI 3,512.29 3,500.00 287.60 63.31 224.34 Pass -Major Risk 04-08 - 04-08 - 04-08 3,378.84 3,375.00 154.50 55.22 99.33 Pass - Major Risk 04-09-0409-D4-09 3,077.76 3,075.00 69.16 53.19 16.03 Pass - Major Risk 04-09 - 04-09PB1 - 04-09PB1 3,077.76 3,075.00 69.16 53.34 15.88 Pass - Major Risk 04-10-04-10-04-10 2,649.13 2,650.00 76.94 1,103.98 -1,026.49 FAIL - Major Risk 0438 - 04-38 - 04-38 8,908.97 9,050.00 250.09 14.74 235.73 Pass - Major Risk 04-41 - 04-41 - 0441 3,451.69 3,450.00 230.55 54.31 176.24 Pass - Major Risk 04 -41 -04 -41A -04-41A 3,451.69 3,450.00 230.55 53.85 176.71 Pass -Major Risk 04-41 - 04-41A - Plan #5 3,451.69 3,450.00 230.55 54.31 176.24 Pass -Major Risk 0441-04-41APB1-04-41APB1 3,451.69 3,450.00 230.55 54.31 176.24 Pass -Major Risk 0441-0441APB2-0441APB2 3,451.69 3,450.00 230.55 54.31 176.24 Pass -Major Risk 0447 - 0447 - 04-47 3,435.14 3,675.00 456.98 78.25 378.72 Pass - Major Risk 10/192AOGCC 017 11:00:33AM COMPASS 5000.1 Build BID _m Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 04 Site Error: O.00usft Reference Well: 04-38 Well Error: O.00usft Reference Wellbore 04-38A Reference Design: 04-38A BP Anticollision Report Local Coordinate Reference: TVD Reference: MD Reference: Norm Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: BA ER 1 UGHES QW Well 04-38 KB @ 53.00usfl (04-38 ACTUAL) KB @ 53.00usft (04-38 ACTUAL) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference Depths are relative to KB @ 53.00usft (04-38 ACTUAL) Coordinates are relative to: 04-38 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK Central Meridian is 150° 0' 0.000 W ° Grid Convergence at Surface is: 1.82° 10119/2017 11:00:A0GCC 33AM COMPASS 5000.1 Build 81D Printed 11/8/2017 10:53:50AM North America - ALASKA - BP Page 1 of 2 Cementing Report Comrtan Well Name: 04-38 / 01 Project: Prudhoe Bay — --_ _ — —_. Sae' PB DS O4 Report no.: 1 Reporttlate: 10/18/2017 — _ _ - -- Spud Event Type: COM- ONSHORE (CON) _ _ _ Start Date: 10/15/2017 _ DateTme: 8/21/1991 - Contractor: NABORS ALASKA DRILLING INC. — - End Date: 10/22/2017 Rig Name/No.: CDR-2 RigRelease' L ATE No X3-018JR-C: (1,134,044.00 ) BPUOI: USA00001143 -- t Active datum: KB (d 53.00usft (above Mean Sea Level) -- —.-- General Information Job type: Primary Cement job start date/time: 10/18/2017 10:30AM Job end datettime: 10/18/2017 12:30PM Cement Company: SCHLUMBERGER Cementer: Cemented String: PRODUCTION LINER 1 String Size: 2.375 (in) String Set TMD: 10,028.00 (usft) Hole Size: 3.250 (in) Pipe Movement Pipe Movement: NO MOVEMENT Rotating Time (Start-End): RPM: Rotating Torque (initfavg/max): (ft-Ibf) Reciprocating Time (Start-End): Recip Drag Up/Down: - (kip) SPM: Stroke Length: Fluid Name: CEMENT Piultle (7 of 1) Slurry Type. CEMENT Purpose: PRIMARY Class: G-CLASS Description: LEAD SLURRY Density: 15.30 (ppg) Yield 1.3100 (fP/sk) Mix Water Ratio: 6.092 (gagsk94) Excess: Mix Method: BATCH Sacks Used: 70.50 (941b sacks) Water Volume: 10.2 (bbl) Excess Slurry Volume: 0.0 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: 8.5 (bbl) Slurry Volume: 16.4 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 8.48 (ppg) PV: 0.00 (cp) YP: 0.000 (Ibf/100ft-) Viscosity. 26.00 (Nqt) Gels 10 Sec: 0.000 (Ibf/100ft-) Gels 10 Min: 0.000 (Ibf/100ft-) Additives Name Type Amount Units Concentration Unit D047 ANTIFOAMAGENT 0.100 GAUSX D206 ANTIFOAMAGENT 0.100 GAUSX D065 DISPERSANT 1.000 %BWOC D167 FLUID LOSS 0.100 % BWOC D600G GASBLOK 1.500 GAUSX D163 CEMENT 5.000 %eWOC BWO Fluid Teets Thick time (hr) Thick temp. Free waster Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength (°F) (%) temp. (cc/30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (`F) ("F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) min psi °F min 5.77 90.00 0.001 80.00 50.0 167.00 1,000.00 Printed 11/8/2017 10:53:50AM Printed 11/8/2017 10:53:50AM North America - ALASKA - BP Page 2 of 2 Cementing Report Common Well Name: 04-38 / 01 Repan no.: 1 Repon date: 1011B12017 Prolrxt: Prudhoe Bay— SRe PB OS 04 � _. I, Spud Date/Time: 8!21/1991 _ _ Even! Type: COM- ONSHORE (CON) I StartDete'. 10/15/2017 End Date: 10/2212017 AFE No.: Contractor: NABORSALASKA DRILLING INC. Rig Name/No.. CDR -2 i Rig Release'. X3 -018J11 -Q. (1,134,044.00) BPUOI: USA00001143 Active datum: KB ®53.00usft (above Mean Sea Level) Sligoo Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ.Top Bottom Plug Pressure F1081 Pressure Rewme Circulate Cmt Vol to Total Annular no. (usft) (usft) Rate Press. Plug Plug Bumped Bumped I tiara Hem Prior Surface Mud Lost Flow (gpm) (psi) (hr) (bbl) (bbl) After (psi) (min) I RIMARV CEMENT 8,531.00 10,026.00 Y Y y Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumped Disp. Rate TMD TMD Pmp date/time job Used temp. temp. (bbl)Rate (bbUmin) (usft) (usft) (scr) bbUmin Toots Casing Test Shoe Test Liner Top Test Teat Pressure: (psi) FIT/LOT: (ppg) Liner Overlap: (usft) Time: (min) Tool: N Positive Test: (ppg) Positive Test Tool: N Cement Found between Shoe and Collar. N Open Hole Length: (usft) Negative Test: (ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretatlon Summary CBL Run: N Cement Top: 8,531.00 (usft) Under Pressure: (psi) How Determined: TOP OF LINER Bond Quality: TOC Sufficient: Y CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator Temp Survey: N Remedial Cement Required: N Him Prior to Log: (hr) How Determined: Printed 11/8/2017 10:53:50AM BAN(ER PRINT DISTRIBUTION LIST HES a GE company COMPANY BP Exploration Alaska In 13 E I v E WELL NAME 04-38A FIELD Prudhoe Bay Unit NOV 0 1 20177 21 7098 28 760 Please sign and return one copy of this transmittal form to: Exploration (Alaska) Inc. rotechnical Data Center, LR2-1 DATA LOGGED 11 / q,/2011 900 E. Benson Blvd. „I K. BENDER Anchorage, Alaska 99505 to acknowled a receipt of this data. COUNTY PRUDHOE BAY AOGCC LOG TYPE GR - RES BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick.Ridec@Lakerhuqhes.com STATUS Final Replacement: COMPANY ADDRESS (FERE% WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V f BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Reason Blvd. Anchorage. Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99510 3 ExxonMObil,AkaSla Attn: Lynda M. Vaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska -AOGCC Ann: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division ofOil & Gas ... Ann: Resource Evaluation 550 West 7th Avenue, Suite 1100 I,+Anchorage, Alaska 99501 L` Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 Attn: Rana Elghonimy v_ LOG DATE October 15, 2017 TODAYS DATE October 30, 2017 Revision Details: Rev. Requested by: --- FIELD/ FINALCD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY I REPORT LOGS CGM, Final Surveys) (Compass) # OF PRIN OF PRIN # OF COPIES J#OFCOPIES # OF COPIES 0 0 1 D 0 0 1 1 1 1 11 0 D 1 0 1 1 1 1 1 0 0 0 0 0 0 TOTALS FOR THIS PAGE: 0 2 4 4 0 THE STATE °fALASKA GOVERNOR BILL WALKER Uchenna Egbejimba Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax 907.276.7542 www.00gcc.alaska.gov Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 04-38A BP Exploration (Alaska), Inc. Permit to Drill Number: 217-098 Surface Location: 383' FSL, 655' FEL, SEC. 27, TI 1N, RI 5E, UM Bottomhole Location: 851' FNL, 896' FEL, SEC. 34, TI IN, RI 5E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. 4` DATED this day of July, 2017. Sincerely, Hollis S. French Chair STATE OF ALASKA ^' ASKA OIL AND GAS CONSERVATION COMMISSION! PERMITTO DRILL f 20 AAC 25.00S n' GVGGIYGLip JUN 2 3 2017 1a. Type ofWork: 1b. Proposed Well Class: Exploratory -Gas ❑ Service - WAG ❑ Service - Disp❑ 1c. Specify Ili Grt f . Drill El Lateral ❑ Stratigraphy_ Test ❑ Development -Oil 0' Service-Winj ❑ Single Zone 0 7"� Coalbed Gas ❑ Gas Hydrates [I Redrill 0' Reentry ❑ Exploratory -Oil ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket 0 • Single Well ❑ 11. Well Name and Number. BP Exploration (Alaska), Inc Bond No. 295105380 • PBU 04-38A 3 Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 10172" TVD: 8654ss , PRUDHOE BAY, PRUDHOE OIL `a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): ADL 028325 ' Surface: 383' FSL. 655' FEL, Sec. 27, T1 IN. RISE, UM 8. DNR Approval Number: 13. Approximate spud date: Top of Productive Horizon: 23' FNL, 366' FEL, Sec. 34, TI N. R1 5E, UM 70-039 September 1, 2017 Total Depth: 851' FNL, 896' FEL, Sec. 34, T1 IN, R15E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 46970 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 53 feet 15. Distance to Nearest Well Open Surface: x- 712164 • y- 5952237 • Zone - ASP 4 GL Elevation above MSL: 18.6 feet to Same Pool: 1550 16. Deviated wells: Kickoff Depth: 8625 • feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 105 degrees Downhole: 3354 - Surface: 2474 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Wei ht Grade Couolino L n th MD ND MD I TVD in -l -ding -t-a data 4.7# 13Cr85 H511 1546' 8575' 8478'ss 10171' 8654'ss 63 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. DepthMD (ft): Effect. Depth TVD (ft): Junk (measured): 9105 9051 8692 8692 8647 8828 Casing Length Size Cement Volume MD TVD Conductor/Structural 78 20• 11 Yards AS 35-113 35-113 Surface 3461 10-3/4" 2910 cf AS III. 406 cf Class'G', 290 cu ft Class'G' 34-3495 34-3494 Intermediate 8500 75/8" 542 cu it MTC, 348 cu ft Class'G' 32-8532 32-8489 Scab Liner 3306 5-1/2" x 3-1@" 385 cu It Class'G' 5418-8724 5417-8678 Liner 889 5-1/2" 189 cu it Class'G' 8213-9102 8175-9048 Perforation Depth MD (ff): 8586-8783 Perforation Depth TVD (ft): 8542-8736 Hydraulic Fracture planned? Yes ❑ No 0 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the Foregoing is true and the procedure approved herein will not be deviated Contact Name Browninq. Zachary H from without prior written approval. Authorized Name Egbeiimba, Uchenna J Contact Email Zachary.BrowningObp.com Authorized Tire Engineering Team Leader - CTD & Contact Phone '1 907 564 5220 Authorized Signature Date Commission Use Only Permit to Drill 7�� /� � Number: /-(1Z Permit Approval -7 See cover letter for other LZZ Date: requirements: Conditions of approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: —/ Other r70F' fts.�- -to 35 -OC 5T��j Samples req d: Yes ❑J No CLY Mud log mq'd: Yes ❑ / No W f}✓h nU l a. V Py'` tic n 'T r / H2S measures Yes Id No ❑ Directional svy req'd: Yes EY No ❑ / fo Z SOO /- S b 7 Spacing exception req'd: Yes ❑ No IV Inclination -only svy req'd: Yes ❑ No 12/1 ✓ Post initial injection MIT req'd: Yes ❑ No APPROVED BY �7 ] ` I Approved by: COMMISSIONER THE COMMISSION I q Date: i I � f/�� V77- Y / -f/ I f- /�lm/ t Ot Revised 512017 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) "ORIGINAL Submit Form and Attachments in Duplicate AAS -3a To: Alaska Oil & Gas Conservation Commission From: Zach Browning CTD Engineer Date: June 19, 2017 Re: 04-38A Permit to Drill Request OW by Approval is requested for a permit to drill a CTD sidetrack lateral from well 04-38 with the Nabors CDR2 Coiled Tubing Drilling rig on or around September 1g`, 2017. Planned operations: The proposed 04-38A CTD sidetrack will be an approximately 1500' Zone 2A/2B producer drilled with the Nabors CDR2 rig on or around September ist, 2017. A 3-1/2" whipstock will be set pre -rig with a -line. The rig will move in, kill the well and mill a 2.80" dual string window (3-1/2" x 5-1/2"), -10' long. The well kicks -off in Zone 4 and will be drilled through the conglomerates and target reserves in Zone 2A/2B. The proposed sidetrack is a -1500' horizontal Ivishak producer to be completed with a 2-3/8" 13Cr solid liner, cemented in place and selectively perforated post rig. The liner cement job or liner top packer will isolate all parent perforations.* Post -Rig Work: 1. V: Tree work as necessary. 2. F: PT Liner lap 3. S: Set LGLVs. LTP set post rig 4. C/WWP: Perforate -550'. 5. T: POP and Test. if needed, and test.* eduled to be in Send test BOPE 250 si low and 3,500 si hi h MASP 2,474 si . 0" Window. V ild section: 325" OH -653' 27 de DLS lanned . eral section to TD: 3.25" OH, -953' 7 de DLS lanned . /8" 13Cr liner leaving TOL at -8575' MD. 6. Pump primarycement'ob: 13 bbls, 15.3 ppg Class G, TOC at TOL -8575' MD .* 7. Freeze rotect well to a min 2,200' TVDss. 8. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) Post -Rig Work: 1. V: Tree work as necessary. 2. F: PT Liner lap 3. S: Set LGLVs. LTP set post rig 4. C/WWP: Perforate -550'. 5. T: POP and Test. if needed, and test.* Mud Program: • Drilling/Completion: a min EMW of 8.4 ppg KCL with Geovis for drilling (489 psi over -balance). Disposal: • All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 3.25" for production hole section from 8625' MD to 10,171' MD. Liner Program: • 2-3/8", 4.7 Ib/ft, H511, 13Cr 8575' MD - 10,171' MD (TD) • A planned 13 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at -8575' MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg (489 psi over -balance). • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 1050, inclination at kick off point is 100. . • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 46,970' • Distance to nearest well within pool - 1550' Logging: • MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. Perforating: • Perforating planned Post -rig: -550' of perforations. 1.56", 60 deg random phasing, 6 spf, pert guns. Anti -Collision Failures: • None. All offset wells pass BP anti -collision scan criteria. • No wells were minor risked. Hazards: • DS 04 is an H2S pad. Latest H2S reading on the 04-38 was 36 ppm on 11/3/2016. • One fault crossings planned, but Lost circulation risk in 04-38A is considered to be LOW. o Fault is considered to be small and losses are not a significant issue in the area. Reservoir Pressure: • The reservoir pressure on 04-38A is expected to be 3,354 psi at 8,800' TVDSS (7.33 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,474 psi. • Amin EMW of 8.4 ppg for this well will provide 489 psi over -balance to the reservoir. Zach Browning CC: Well File CTD Engineer Joseph Lastufka 564-5220 TREE= 4-1/16'CIW WELLHEAD FMC ACTUATOR BAKER C OKB. ELEV . - 53 BF. ELEV = 6 KOP= 7100' Max Angle = 14' Q 7300 20" OONXK-70R —� Datum M) = 8903' #, Datum WD: 8800' SS p _ 143/4' CSG, 45.5#, J-55,1)=9.953- -- �3494 Minimum -55,D=9.953 - Minimum ID = 2.75" @ 6600' 34/2' HES XN NIPPLE 4 -1/2 -TBG, 12.6#, 13CR-80 t1 , 5405 .0152 bpf, D= 3.958" TOPOF St/2 X 3-12' SCAB LNR TBG, 9.3#, 13CR-80 FOX, - 6622' 'bpf, D = 2.992 LB LNR 17#, NI80S NSCC 8195' D = 4.892' TOP OF 5-12"LNR 213' 7-5/8' CSG, 29.7#, L-80, D = 6.875' — L72- LNRSCAB, 9.2#, 13CR-80 NSCr, 8087 bpf, D= 2.992 PERFORATION SUKWARY REF LOG: ARRAY SONG ON 09/01/91 ANGLE AT TOP F4 : 100 @ B586' Note: Refer to Roduction DB for historical perf data SIZE SPF NTHNAL CpnSgz SHOT SOZ 2 6 8586-9596 O 04/15/15 CH r 2-1/2' 6 8616-8632 S 10/31/9506/03/05 04127117 CJNUM) GLV GO (0424/17) 3-38' 4 8650-8662 S 09/05/91 02108)95 2-12' 6 8650-8662 S 10/31/95 0&03/05 3-38' 4 8662-8675 S 09/05!91 0&03/05 2-12" 6 8733-8740 C 0326/09 2-12' 6 8754-8756 C 0326/09 2-12" 6 8773 - 8783 C 0&14105 2-18' 4 8898-89 S 1010791 08/03/05 2-1/4" 4 8916-8923 S 102391 W03105 2-1/4' 4 8927 - 8937 S 1023!91 08103105 13CR410, .0232 bpf, D " p A _3 Q SAFE, , NOTES: "'CHROME TBG, LNR 8 SCAB LNR"' �T V 2162' 4-1/2"CAM TRCF SSSV tom, D=3.812' LOCKED OLfr (0 0825108)) me i FT MA navxa c $346' 7-58" X 4-12' BKR SABL-3 PKR D = J 4-12"X3-12'XO.D=2.81' (FLUGV BE TIGHT) 7-518"X 5-1/2 SLI+6 LNR HGR D =, 656T (—{S12'X312'6102 S3F16Z D= 6600' 3-12"FES XN NP, =D 13.1/*VAM. D=2.99' 1 X 871W 1—j3.12'VN-EG,D=2.87' _IEMD Tr NOT LOGO FISH - QUICK DRLL COMPOSITE PLUG - MLLED 8 PUSHED OUT TAL PPE (09/07106) STOP OF CMT (82/05) D DATE REV BY I COMAENTS DATE REV BY COMA94TS 0910691 ORIGINAL COMPLETION 02375/17 BS/JM) UPDATED PERF TABLE DO 0.16 CH r DATE 0312795 616 I 04127117 CJNUM) GLV GO (0424/17) 04115/15 TC—UPJC ADPE RFS 2 5278 5276 PERF/ LNR/ CSC/TBG UPDATES A-KBMG_-DRAM 16 00484/117 GLV CIO (09/06116) $346' 7-58" X 4-12' BKR SABL-3 PKR D = J 4-12"X3-12'XO.D=2.81' (FLUGV BE TIGHT) 7-518"X 5-1/2 SLI+6 LNR HGR D =, 656T (—{S12'X312'6102 S3F16Z D= 6600' 3-12"FES XN NP, =D 13.1/*VAM. D=2.99' 1 X 871W 1—j3.12'VN-EG,D=2.87' _IEMD Tr NOT LOGO FISH - QUICK DRLL COMPOSITE PLUG - MLLED 8 PUSHED OUT TAL PPE (09/07106) STOP OF CMT (82/05) D DATE REV BY I COMAENTS DATE REV BY COMA94TS 0910691 ORIGINAL COMPLETION 02375/17 BS/JM) UPDATED PERF TABLE 02308/95 0.16 RWO (SCAB LN R) 04/11/17 CJNJM) MNDR EDITS TO WBS 0312795 616 RIND 04127117 CJNUM) GLV GO (0424/17) 04115/15 TC—UPJC ADPE RFS 04/16115 PJC PERF/ LNR/ CSC/TBG UPDATES 09/07/16J GLV CIO (09/06116) WHJ_FEAD C Flub ACTUATOR DATE REV BY COMu NTS OKB. ELLV • 53' BF. HEV = KOP= 7100' Max Angle Datum NO _ Datum TVD; 88W'SS 5-72' PROPOSAL 10-3/4' CSG, 45.5#, 9-559 D = 9.953' 3494' Minimum ID = 4-1/2' TBG, 12.89, 13CR-80 NSCT, —5406- .0152 405'.0152 bpf, D = 3.958' TOP OF 5-1/2' X 11/2' SCAB LNR 6409' 11/2' TBG, 9.309 13CR$0 FOX, .0087 bpf, D = 2.992' 5-'12 SCAB LNR 170, Nr80S NSCC .0232 bpf, D = 4892' LNR 1 7-5/8- CSG, 29.70, L-80. D= 6.875' 1 ,SCAB, 920, 13CR-80 D = 2.992' PERFORATION SL&"RY REF LOG: ON ANGLE AT TOP PERF: '@ ' Note: Refer to Production DB for historical cert data D = 4.892 9103' 04-38A SAFL NOTES:—CHROME TBG, LKRBSCAB LNR— GAS LFT MANTIRR S 1 D = 3.94' 1-12' X 3-M. X0. D = 2.81' (PLUG WLL BE TIGFIr) r-5/8' X 5-12' SL4-6 LNR HGR D = 4.88' 6567' HS-1/YX3-1/2'BKRS-3H(RID=2.82- 8600' kf3-1/2' HES XN NP MILLED TO 2.80" 6622' 11/2' WLEG, D=2.99' 15-12'X112'XO, 9)=2.8T I DATE I I OORMENTS DATE REV BY COMu NTS 09/06197 T I MD 02/06195 r IaNO (SCAB LNI;Q r DATE WO 0524117 2 522 8 5276 1 A-KBMG OMY BKS 1 00720/09 1 D = 3.94' 1-12' X 3-M. X0. D = 2.81' (PLUG WLL BE TIGFIr) r-5/8' X 5-12' SL4-6 LNR HGR D = 4.88' 6567' HS-1/YX3-1/2'BKRS-3H(RID=2.82- 8600' kf3-1/2' HES XN NP MILLED TO 2.80" 6622' 11/2' WLEG, D=2.99' 15-12'X112'XO, 9)=2.8T I DATE RLV BY I OORMENTS DATE REV BY COMu NTS 09/06197 —ml OTSGINALCOMPLETTON 02/06195 r IaNO (SCAB LNI;Q 0327095 D.16 WO 0524117 CTD(04-39A) 0524/17 JMD BULTCTDPROPOSAL 2.7D' SEALBORE DEPLOY SLY, D=225' 2-3/8' X NP, D= 1.813- MLLOUT WINDOW (04-38A) 8625' - PBTO 11, .0039 bpf, ID = 1.995' PRUDI-DE BAY Mr WELL: 04-38A PEFUT ND: AA No: '500292221001 T1 IN, Rl5E 383FSL 8 655 FE- BP EL BP Exploration (Alaska) Well 0438A ' -)R2-AC BOP Schematic Quick Test Sub to Otis -1.1ft � � --'— ---- �-_--__-_- Top of 7" Otis O.Oft —._. _.—.—._._._. _ Distances from top of riser Excluding quick -test sub Top of Annular I 0.0 ft i Top Annular Element 0.7 ft Bottom Annular CL Blind/Shears 3.3 t Cu 2" Combi's 4.1 ft --1 Deployment CL 2-3/8" Combi's CL 2 3/8" Combi's CL Blind/Shears CL 2" Combi's CL of Top Swab CL of Bottom Swab CL Flow Tee CL of SSV CL of Master Valve LDS Gound Level 7.4ft 81 Kill Line 10.0 ft � 10.7 ft 13.3 ft 14.8 f[ 16.2 ft BOP2 17.5 ft } Fusable 19.0 k BOPt 20.5 ft --q Ite 15 -Jun -17 ` \ 7-1/16" 6k Flange x T' Otis eox 11-- Swab 2 Swab 1 r� Test Pump Hose : '`'' s b 1.�I♦',. North America - ALASKA - BP Prudhoe Bay PB DS 04 04-38 04-38A Plan: 04-38A WP08 BP Coil Tubing Report 19 June, 2017 FUa BAKER HUGHES W005 PB DS 04, TR -11-15 2 : by 10000 BAKER Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 04 Well: 04-38 Wellbore: 04-38A Design: 04-38A WP08 BP PB DS 04, TR -11-15 //.Fa\ BP Coil Tubing Report BAKER From: Map FRMIS Local Coordinate Reference: Well 04-38 Slot Radius: TVD Reference: Mean Sea Level ' (usft) MD Reference: 53 : 38 8/21/1991 00:00 @ 53.00usft (generic drilling dg North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM RSK- Alaska PROD -ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27. OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27'OGP-Usa AK/Alaska zone 4[26734'1586• • Using geodetic scale factor Site PB DS 04, TR -11-15 Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 usft Slot Radius: Well W IIP 04-38, 04-38 (usft) e usition +NI•S 0.00 usft Northing: +EI -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 04-38A Magnetics Model Name Sample Date Declination (I BGGM2016 10/1/2017 17.77 Design 04-38A WP08 Audit Notes: Version: Phase: PLAN Vertical Section: Depth From (TVD) +wS (usft) (usft) -20.98 0.00 5,953,265.350 usft 711,234.970 usft 0.000 in 5,952,236.750 usft 712,164.070 usft 20.98 usft Latitude: Longitude: Grid Convergence: Dip Angle Field Strength V) (nn 81.02 57.545 Tie On Depth: 8,588.50 +E/411 Direction (usft) 11 0.00 250.00 Latitude: Longitude: Ground Level: 70° 16'31.598 N 148' 17'27.907 W 1.61 " 70° 16'21.228 N 148' 17' 1.707 W • 18.60 usft 6/19/2017 1:06.38PM Page 2 COMPASS 5000.1 Build 81O BP BAKER•• BP Coil Tubing Report HUGHES Local Coordinate Reference: p'510vee TVD Reference: Mean Sea Level Company: North America - ALASKA - BP Project: Prudhoe Bay 53 : 38 81211199100:00 @ 53.00usft (generic drilling rig Site: PB DS 04 North Reference: Well: 04-38 Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A WP08 Database: Survey Tool Program Date 6/19/2017 EDM R5K - Alaska PROD - ANCP1 From To Description (usft) (usft) Survey (Wellbore) 80.20 8,588.50 1 : Schlumberger GCT multishot (04-38) 8.588.50 10,171.53 04-38A WP08 (04-38A) Planned Survey MWD MWD - Standard MD Inc AN NDSS (usft) 1°I 1°I Easting (usft) 8,588.50 10.03 152.46 8,491.67 04-38A Actual Survey (usft) (°1100usI) (usft ) 8,60.00 10.08 152.46 8,502.99 8,605.70 10.10 152.46 8,508.61 04.38A Actual Survey 292.46 5,951,833.642 712,468.001 8r623.00 10.13 152.51 8.525.64 04-38A Actual Survey TIP 5,951,832.770 712,468.487 0.41 8,625.00 10.15 152.49 8,527.61 KOP 712,469.966 0.18 -134.60 8,645.00 11.95 152.49 8,547.23 End 9deg/100ft 1.02 -134.64 -9.99 8,675.00 20.05 152.49 8,576.05 6 -135.14 0.00 426.16 8,700.00 25.52 142.01 8,599.10 8,800.00 50.52 123.84 8,677.48 8,900.00 76.77 115.91 8,721.54 8,906.83 78.58 115.46 8,723.00 7 27.17 -168.44 -31.82 9,000.00 84.72 140.30 8,736.73 9,037.07 87.50 150.00 8,739.25 8 5,951,729.352 712,613.399 27.17 9,100.00 87.87 167.00 8,741.81 9,200.00 88.83 194.00 8,744.74 BP BAKER•• BP Coil Tubing Report HUGHES 6119/2017 1 r06:38PM Page 3 COMPASS 5000.1 Build 61D Local Coordinate Reference: Well 04-38 TVD Reference: Mean Sea Level MD Reference: 53 : 38 81211199100:00 @ 53.00usft (generic drilling rig North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Tool Name Description GCT -MS Schlumberger GCT multishot MWD MWD - Standard WS EIW Northing Easting DLeg V. Sec TFace (usft) (usft) (usft) (usft) (°1100usI) (usft ) 1°1 -409.76 291.53 5,951,835.395 712,467.023 0.00 -133.80 0.00 411.54 292.46 5,951,833.642 712,468.001 0.41 -134.07 0.00 -412.42 292.92 5,951,832.770 712,468.487 0.41 -134.20 0.00 -415.12 294.32 5,951,830.118 712,469.966 0.18 -134.60 16.34 415.43 294.49 5,951,829.808 712,470.137 1.02 -134.64 -9.99 -418.83 296.26 5,951,826.460 712,472.003 9.00 -135.14 0.00 426.16 300.07 5,951,819.243 712,476.024 27.00 -136.22 0.00 -434.21 305.37 5,951,811.341 712,481.549 27.17 -138.45 -41.50 473.42 351.56 5,951,773.453 712,528.818 27.17 -168.44 -31.82 -517.00 428.85 5,951,732.074 712,607.305 27.17 -226.17 -17.11 -519.89 434.87 5,951,729.352 712,613.399 27.17 -230.83 -13.49 -576.13 506.90 5,951,675.170 712,686.984 27.17 -279.28 78.02 -606.44 528.00 5,951,645.466 712,708.931 27.17 -288.74 74.35 -664.73 550.96 5,951,587.848 712,733.523 27.00 -290.38 89.10 -763.76 550.09 5,951,488.838 712,735.447 27.00 -255.69 88.41 6119/2017 1 r06:38PM Page 3 COMPASS 5000.1 Build 61D by100#41100#41 Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 04 Well: 04-38 Wellbore: 04-38A Design: D4 -38A VVP08 Planned Survey MD (usft) 9,277.86 End 27deg/100ft 9,300.00 9,400.00 9,500.00 9,600.00 9,700.00 9,707.86 10 9,800.00 9,900.00 9,931.80 11 10,000.00 10,031.39 12 10,100.00 10,171.53 TD at 10171.53 BP Art •■ BP Coil Tubing Report EIW BAKE Easting DLeg HUGHES Local Coordinate Reference: Well 04-38 P) TVD Reference: Mean Sea Level (usft( MD Reference: 53 : 38 8/21/1991 00:00 @ 53.00usft (generic drilling rig North Reference: True (•) Survey Calculation Method: Minimum Curvature 8,745.72 Database: EDM R5K - Alaska PROD - ANCP1 5,951,417.516 Inc Art TVDSS WS EIW Northing Easting DLeg V. Sec TFace (°) P) (usft) (usft) (usft( (usft( (usly (°1109usf0 (usft) (•) 89.76 215.00 8,745.72 -834.21 517.99 5,951,417.516 712,705.343 27.00 -201.43 87.62 89.78 216.55 8,745.80 -852.17 505.04 5,951,399.197 712,692.913 7.00 -183.13 89.00 89.91 223.55 8,746.07 -928.67 440.74 5,951,320.917 712,630.795 7.00 -96.54 88.99 90.04 230.55 8,746.12 -996.77 367.59 5,951,250.789 712,559.600 7.00 -4.51 88.98 90.16 237.55 6,745.94 -1,055.44 286.69 5,951,169.859 712,480.391 7.00 91.58 8897 90.28 244.55 8,745.55 -1,103.83 199.25 5,951,139.035 712,394.349 7.00 190.30 8898 90.29 245.10 8,745.51 -1,107.17 192.14 5,951,135.491 712,387.333 7.00 198.13 69.01 96.35 247.31 8,740.18 -1,144.27 108.02 5,951,096.036 712,304.298 7.00 289.86 20.00 102.92 249.78 8,723.45 -1,180.33 16.33 5,951,057.407 712,213.664 7.00 388.36 20.13 105.00 250.59 8,715.78 -1,190.79 -12.70 5,951,046.131 712,184.945 7.00 419.21 20.54 105.00 255.53 0,698.12 -1,209.98 -75.70 5,951,025.172 712,122.513 7.00 484.98 89.36 105.00 257.81 8,690.00 -1,216.98 -105.20 5,951,017.352 712,093.223 7.00 515.09 89.71 105.00 262.78 8,672.24 -1,228.15 -170.51 5,951,004.345 712,028.263 7.00 580.27 89.36 105.00 267.97 8,653.73 -1,233.72 -239.35 5,950,996.835 711,959.608 7.00 645.87 89.33 6119/2017 1:06:38PM Page 4 COMPASS 5000.1 Build BID e,.., BP .000,41p BP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA -BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 04 MD Reference: 53 : 38 8121/199100:00 @ 53.00usft (generic drilling rig Well: 0438 North Reference: True Wellbore: 04-3aA Survey Calculation Method: Minimum Curvature Design: 04-38A WPDB Database: EDM R5K -Alaska PROD -ANCP7 Targets --- - -� Target Name -hidmiss target Dip Angle Dip Dir. TVD -NI-S +E/-W Northing Easting -Shape (°) (1) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 04-38A T3 0.00 0.00 8,683.00 -1,221.70 -127.47 5,951,012.000 712,071.100 70° 16'9.212 N 148° 17'5.417 W - plan misses target center by 0.91 usft at 10055.18ush MD (8683.84 TVD, -1221.49 N, -127.73 E) - Point 04-38A Fault 2 0.00 0.00 D.00 -573.36 722.09 5,951,684.000 712,902.000 70° 16' 15.589 N 148° 16'40.685 W - plan misses target center by 8504.15usft at 8558.50usft MD (8491.67 TVD, 409.76 N, 291.53 E) - Polygon Point 0.00 0.00 0.00 5,951,684.00 712,902.00 Point 0.00 -722.03 450.85 5,950,975.00 713,373.00 04-38A T4 0.00 0.00 8,654.00 -1,234.58 -238.48 5,950,996.000 711,960.500 70° 16' 9.086 N 148° 17'8.649 W - plan misses target center by 0.89usft at 10170.69usft MD (8653.93 TVD, -1233.69 N, -238.54 E) - Point 04-38A Ply D.00 0.00 0.00 -254.61 406.03 5,951,993.700 712,577.100 70° 16' 18.724 N 148" 16'49.886 W - plan misses target center by 8493.86usft at 8588.50usft MD (8491.67 TVD, -409.76 N, 291.53 E) - Polygon Point 1 0.00 0.00 0.00 5,951,993.70 712,577.10 Point 0.00 -396.25 243.94 5,951,604.50 712,832.10 Point 0.00 -653.34 281.81 5,951,348.60 712,877.20 Point 0.00 -1,026.98 -34.57 5,950,966.20 712,571.50 Point 0.00 -1,190.32 -851.74 5,950,779.90 711,759.30 Point 0.00 -752.92 -802.08 5,951,218.50 711,796.60 Point 0.00 -716.86 487.93 5,951,263.40 712,109.60 Point 0.00 -577.49 -80.42 5,951,414.20 712,513.00 Point 9 0.00 -248.61 -177.39 5,951,740.20 712,406.80 04-38A T2 0.00 0.00 8,740.00 -1,079.24 248.72 5,951,165.000 712,443.100 70° 16' 10.613 N 148° 16'54.467 W - plan misses target center by 5.87usft at 9644.80usft MD (8745.80 TVD, -1078.44 N. 248.25 E) - Point 04-38A Fault 1 0.00 0.00 0.00 -627.19 218.35 5,951,616.000 712,400.000 70' 16' 15.059 N 148° 16'55.350 W - plan misses target center by 8494.77usft at 8588.50usft MD (8491.67 TVD, -409.76 N, 291.53 E) - Polygon Point 0.00 0.00 0.00 5,951,616.00 712,400.00 Point 0.00 -947.34 564.55 5,950,685.00 712,991.01 04-38A Ti 0.00 0.00 8,740.00 -590.04 497.72 5,951,661.000 712,678.200 70° 16' 15.425 N 148° 16'47.217 W - plan misses target center by 16.16usft at 9006.39usft MD (6737.29 TVD, -581.09 N, 510.89 E) 6/192017 1: 06:38PM Page 5 COMPASS 5000.1 Build 81D %4#00 BP- �►NT f" BP Coil Tubing Report �K R•■ HUGMS Company: North America- ALASKA -BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay Site: PB DS 04 TVD Reference: Mean Sea Level Weil: 0438 MD Reference: 53: 38 8/21/1991 00:00 Q 53.00usft (generic drilling rig North Reference: True Wellbore: 04-38A Survey Calculation Method: Minimum Curvature Design: 04-38A WPOB Database: EDM R5K-Alaska PROD -ANCP1 - Point Casing Points - -- Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) Will Name (in) (in) 8.625.00 8,527.61 5 1/2" X 3 1/2" Planned TOWS 3.500 3.500 10,171.53 8,653.72 23/8" 2.375 3.000 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W ' (usft) (usft) (usft) (usft) Comment 8,588.50 8,491.67 -409.76 291.53 04-38AActual Survey 8,605.70 8,5D8.61 412.42 292.92 04-38A Actual Survey 8,623.00 8,525.64 -415.12 294.32 0438AActual Survey TIP 8,625.00 8,527.61 -415.43 294.49 KOP 8,645.00 8,547.23 418.83 296.26 End 9deg/100ft 8,675.00 8,576.05 -426.16 300.07 6 8,906.83 8,723.00 -519.89 434,87 7 9,037.07 8,739.25 -606.44 528.00 8 9,277.86 8,745.72 -834.21 517.99 End 27deg/100% 9,707.86 8,745.51 -1,107.17 192.14 10 9,931.80 8,715.78 -1,190.79 -12.70 11 10,031.39 8,690.00 -1,216.98 -105.20 12 10,171.53 8,653.73 -1,233.72 -239.35 TD at 10171.53 Checked By: Approved By: Date: 6/19/2017 1:08:38PM Page 6 COMPASS 5000,1 Build 81D \� 2 by PmjeOF PrutlhOeary Sib: Pa0804 WNI: 0438 a.�.mmTuwm N,eMexaM 17. NePwwrrO WELLBORE nEfAILS: 0438A 04381 BEf91Eu0ENfaam3WN Cow (NEInebww Wm04x, Tro1bN n.. M.■ a-Y!w WNWgre: 040&4 seervN.crwan Doaw�.°1 VeF(WDlneWm . N hew N BAM t6.50 Plan 043BA WPO810A-jelpl-]BAI Parent WINIDore 0438 s.cwn N511mteienw sall0a0x, o.Wn Mwur Dept PMenw 51 AWIll%IWAD@MANry19e�udAMFi1 p��/t�!!e HUGM NOMing EasGng Noel Brrimll Tieon MO: 8586.50 LongiWtle SIM "S 0.00 000 5952236]50 712164070 70'16.2122aN aoaemn Nemo. Brauuencavee.e Vertical Section at 250.00° (50 us W in) WELL WTNLS; 0438 GIouMLweL t6.50 H -W NOMing EasGng LaWWEe LongiWtle SIM "S 0.00 000 5952236]50 712164070 70'16.2122aN 148.17'V07W 04-381 WP08 SECTIONOETA&S ANNOTATIONS 4001 Sec MD Inc Azi %TVD .MLS +EFW Oleg TF,,VSwt Target TVD MD Amoleim 1 858850 10.03 152.46 8491.67 409.76 291.53 0.00 0.00 -133.60 8491.67 858&50 043&AACImISuaey sw 04-38A Fnu82 2 6605.70 10.10 152.46 8508.61 412.42 29292 0.41 0.00 -134.20 8508.61 860&70 0438AActual5uruay w 38 4-3k 3 662310 10.13 152.51 8525.64 415.12 294.32 0.18 1634 -134.60 8525.64 8623.00 0436AAcIWSumyTlP I 400. 4 6625.00 10.15 152.49 8527,61 415.43 294.49 1.02 -9.99 -134.64 0527.61 8625.00 KOP 5 6645.00 11.95 152.49 654723 418.83 296.26 9.00 0.00 435.14 8547.23 8645.00 End9deg11008 2 o4.3aA raldll 04-38ATI 6 8675.00 20.05 152.49 8576.05 426,16 300.07 27.00 040 436.22 8576.05 8675.00 6 -700 7 890683 78.58 115.46 8723,00 61919 434.87 27.17 41.50 -23013 6723.00 8906.83 7 8 9037.07 87.50 150.00 8739.25 60614 528.00 27.17 78.02 -288.74 8739.25 9037.07 8 c 0 .im 9 927716 89.76 215.00 8745.72 434.21 517.99 27.00 89.10 -201.43 8745.72 9277.85 End27dagllOD8 10 970716 90.29 245.10 8745.51 4107.17 19214 7.00 8910 198.13 8745.51 9707.86 10 11 9931.80 105.00 25059 8715.78 -1190.79 -12.70 740 20.00 419.21 871578 9931.80 11 + -9w + 12 10031.39 105.00 257.81 869040 .1216,98 -10520 7.00 90.00 515.09 8690.00 10031.39 12 C 13 70171.53 705.00 267.97 8653.1 -7237.72 -23935 7.00 90.00 64617 8653.73 10171.53 TON 10171.53�0 -two u4aenn s uwl O4i8AT3 0.1200: W-34AT4 04-3&0138A -15W -1800 17wi -WU -550 400 -300 WO -100 0 100 200 300 400 500 6w 700 850 900 1000 1100 1200 West( -)/East(+) (100 usft/in) $500 w-JaAACWNSnrvey P KOP 04-38A WP08 C 9558 800 fnd9&g/IOOfi ' 6 0438A T4 h 8650- W -39A N - C 04-38/ 39A 8700. 7 B 04-38A'IY Mat 1017153 Q12 8750 - II 5Wj 04-38ATI 10 ' smo. - 8850 3 F Nw. tl950 - Mean - i04 -38n4 -3e -900 -7M -0w fi90 S00 -550 -Sw 450 1100 -3% JOU -250 .WO -150 -100 -w 0 50 100 Iso 200 250 300 350 NO 450 500 550 600 6.io 700 750 NO 950 900 9% Iwo loso Ilw 1150 Vertical Section at 250.00° (50 us W in) FUNep �. xom WELMORE DETAILS: 00.38A REFS .EIWORM131ax Project: PSDB Bay xwa wx.m.1+_ 514e: P OS OC i WaN: 04,38 NgnXVFW 00.384 CDa'enYolN Releierc¢ WeY06JB.iiuNwN ME Obp Bleryh e1a1.b vn N.NOl Rnwece W.(MON.00 Wellbore: O138A apxax:n Saem0'slRepren®. spolBUBx.9oBEl BAKER o.. ro�w1 Parent Wellbore: 00.38 PIen:00.38A WPOB (Oh38'00.08A) xbwrm 0ecn Reprence sJ JB Brzul ssl oam SJ BBw'n lg�re�i�enon i I xsaseraxan Tam MD: 8588.50 cap�pm�xtmoe tiwmwncuweme @ are HUGHES -65 -130 -195 -MO -3z5 a90 -455 -520 -585 -650 C 415 J -980 + -845 p -910 -975 t VI 1105 -1170 -1335 -1300 -1365 -1430 -1495 -1560 -1625 WN l -1690 Me80 Sea Le9ei -910 -845 480 -715 -M -585 -530 455 -390 -325 360 -195 -130 -65 0 65 130 195 360 325 390 455 520 585 650 715 780 845 910 975 ]NO 1105 1170 1235 1300 1365 1430 1495 West( -)/East(+) (65 usf in) Project: Prudhoe Bay Site: PB DS 04 Well: 04.38 Wellbore: 04.38A Plan: 04-38A WP08 (04.38/04-38A) ANTI -COLLISION SETTINGS COMPANY DETAILS: North Amenca-ALASKA - BP Interpolation Method: MD, interval: 25.00 Galculabon Mearod: Mmonum Curvature Depth Range From: 8588.50 To 10171.53 Error System: ISCWSA Results Limited By: Centre Distance: 1213.95 Scan Method: Tray. Cylinder North Reference: Plan: 0438A WPOS (04.38/04-38A) Error Surface: Elliptical Conic Wamino Method: Rules Based FIN BAWK�EER�•�•� HUGHES LEGEND w 00.38. 0138, 0138 V1 Project: Prudhoe Bay Interpolation Method: MD, interval: 25.00 PB04 Well:ell: Oby 04.368 Wellbore: 04.38A Plan: 04-3BA WP08 (04.38104.38A) Possible Magnetic Interference: From KOP to 8,780' MD ANTI -COLLISION SETTINGS COMPANY DETAILS: North America -ALASKA -BP Interpolation Method: MD, interval: 25.00 Calculation Method: Minimum Curvature Depth Range From: 8588.50 To 10171.53 Error System: ISCWSA Results Limited By: Centre Distance: 1213.95 Scan Method: Trw.. Cylinder North Reference: Plan: 04-38A WPOB (04.38104.38A) Error Surface: Elliptical Conic Warning Method: Rules Based Depth Range: 8588.50 To 10171.53 From Colour Ta MD 8589 8780 8780 8900 8900 10172 Vi17 F110 112 BAKER HUHES c�oo.d ltM: uw +ws .aw 9mMm9 Euap e.awa. lonal61d. sloe o.w am aeaaa3r.7w nnam9 7Vuaaaa 1a•IrIM Sec MO Inc Aa NO +NIS +FJ -W 0109 TFace V d 1 8588.50 10.03 152.46 8491.67 -409.76 291.53 OAD 0.00 -133.80 2Bfi05.70 10.10 152.46 8509.61 -412.42 292.92 0.41 0.00 -1M.20 3 Bfi23.D0 10.13 152.51 8525.64 415.12 294.32 0.18 16.34 -134.60 4 8625.00 10.15 152.49 8527.61 415.43 294.49 1.02 -9.99 -134.64 5 8645.00 11.95 152.49 8547.23 418.83 298.28 9.00 0.00 -135.14 6 8675.00 20.05 152.48 8576.05 428.16 300.07 27.00 0.00 -136.22 7 8908.63 78.58 115.46 8723.00 .519.89 434.87 27.17 41.50 -230.83 8 9037.07 87.50 150.00 8739.25 $08.44 528.00 27.17 78.02 .288.74 9 9277.86 89.76 215.00 8745.72 SM.21 517.99 27.00 89.10 .201.43 10 9707.88 90.29 245.10 9745.51 -1107.17 192.14 7.00 89.00 198.13 11 9931.90 105.00 250.59 8715]6 -119079 .12.70 7.00 20.00 419.21 12 10031.39 105.00 257.81 6690.00 -121688 -105.20 7.00 90.00 515.09 13 10171.53 105.00 267.97 8653.73 -1233.72 -239.35 7.00 90.00 sail 6U0.VEYPR03a4M OW:N17L 1KO :WCa VfealM'.Y% V ww )ry Fmm D. To swrylPW T-1 420 aW&50 a6T44S Se 1P171e3 waar,vcael M, awn Contact Into �1�1 24 12 kse V919Vei-Tech5n10 PM,. rMa W407044784379 Ce1PMne907-341-7fi0a EmergercyigYoshalkagarsingh SwveyManager+6fa�€49e°oua vl 907342-2436 Cel Phone TwSWrdivant ODCoGninater 2 22 200 40 907-205-6294 Cel Phone PaInck Miler MWDCoordinalar 907-952-3497 Cel Phone 180 2 240 60 canu9ich- Opefa82-5534 ns CelPo na Azimuth from North [0] vs Centre to Centre Separation [10 usfUin] 180 907-382-5534 Cel Pnone Azimuth from North t°] vs Centre to Centre Separation 140 usr "Vol r'. � p North America - ALASKA - BP Prudhoe Bay PB DS 04 04-38 USA00001143 04-38A 04-38A WP08 Travelling Cylinder Report 19 June, 2017 rias BAKER HUGHES FrA Fla by Travelling CyyIli der Report BAKER HUGH Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 04 Site Error: 0.00 usft Reference Well: 04-38 Well Error: 0.00 usft Reference Wellbore 04-38A Reference Design: 04-38A WPO8 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 04-38 Mean Sea Level 53: 38 8/21/1991 00:00 @ 53.00usft (genenc drilling ng) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCP1 Offset Datum Reference 04-38A WPO8 GCT -MS Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference WARNING: There is hidden fight data in this project Interpolation Method: MD Interval 25.00usR Error Model: ISCWSA Depth Range: 8,588.50 to 10, 171.53usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,213.95 usft Error Surface: Elliptical Conic Survey Tool Program Date 8/19/2017 From To (usft) (usft) Survey(Wellbore) 80.20 8,588.50 1 : Schlumberger GCT mulfishm (04-38) 8,588.50 10,171.53 04-38A WP08 (04-38A) Casing Points Tool Name Description GCT -MS Schlumberger GCT multishol MWD MWD -Standard Measured Vertical Casing Hole Depth Depth Reference Diameter Diameter (usft) (usR) Name (in) (in) 3,494.00 3,439,82 103/4" 10.750 13.520 8,531.00 8,435.02 75/8" 7.625 9.875 8,625.00 8,527.61 51/2" X 31/2" Planned TOWS 3.500 3.500 10,171.53 8,653.72 23/8" 2.375 3.000 Summary PB DS 04 - 0438 - 0438 - 04-38 Reference Offset Centre to No -Go Allowable onset Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Reference OmM (usm (earn Offset Well -Wellbore -Design (usft) (usft) (usft) lush) NO eP Diva.. (usnl PB DS 04 B.6Dow 9.503.00 8.600.00 8,503.00 am 0.03 04-08 - 04-08 - 04-08 -41154 29248 Dam 0 D Out of range 04-09 -04-09 - 0409 8.62500 8,52761 8.62500 552791 am Out of range 04-09 - 04-09PB1 - 04-09PB1 41543 284.49 0.000 000 Out of range 04-10 - 04-10 - 04-10 B.fi49.98 8,552.09 8,650.00 8,552.21 0.00 Out of range 04-38-0438-0438 8,888.50 9,075.00 263.36 9.32 263.38 Pau - NOERRORS 04-41 - 04-41 - 0441 8.67465 9,57572 8,675.00 8,576.79 0.01 Out of range 0441 - 04-41 A- 04-41A -42336 298.70 0000 3.18 Out of range 0441 - 04-41 A- Plan #5 SAM 8.597.83 0,70000 9,80137 002 Out of range 04-41 - D4-41APB1 - 04-41APB1 -42738 300.94 0.000 833 Out of range 04-41 - 04-41APB2 - 04-41APB2 5721.36 8,617.95 8,72500 8,625.93 003 Out of range Offset Design PB DS 04 - 0438 - 0438 - 04-38 onsetsne Error. 0,00 usft survey Program: 80.GCT-MS Rmerence onset Semi Major Axis Rule Assigm,& NOERRORS Onset Mhll EDor: 0.00 usft Measured Vertical Depth Miss bean( (earn Measured mob osm Vemcal osob (usm Reference OmM (usm (earn Toolrace Azimuth V) Ousel wellbore comm mow. S -Vi (usnl (usn) Casing- HPNsim pal comm to comm luanl NO eP Diva.. (usnl Allowable warning Devisnan lusnl B.6Dow 9.503.00 8.600.00 8,503.00 am 0.03 -1240 -41154 29248 Dam 0 D 002 0.00 Pass - NOERRORS 8.62500 8,52761 8.62500 552791 am 0.10 -106.95 41543 284.49 0.000 000 003 0.06 Pass. NOERRORS B.fi49.98 8,552.09 8,650.00 8,552.21 0.00 0.17 26.24 419.37 286.55 0006 0.51 0.53 0.51 Pass-NOERRORS 8.67465 9,57572 8,675.00 8,576.79 0.01 0.23 no -42336 298.70 0000 3.18 1.71 3.10 Pass-NOERRORS SAM 8.597.83 0,70000 9,80137 002 029 -33.06 -42738 300.94 0.000 833 263 0.33 Pass-NOERRORS 5721.36 8,617.95 8,72500 8,625.93 003 0.38 -4080 431.44 303.25 0 a 1570 359 1570 Pass - NOERRORS CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 81192017 10:45a0AM Page 2 COMPASS 5".1 Build 81D BP by T • ravelling Cylinder Report BAKER MAP fag HUGHES Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 04 Site Error: 0.00 usft Reference Well: 0438 Well Error: 0.00 usft Reference Wellbore 04-38A Reference Design: 04-38A WP08 Local Co-ordinate Reference: ND Reference: MO Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 04-38 Mean Sea Level 53: 38 8/21/1991 00:00 @ 53.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 04 - 04-38 - 04-38 - 04-38 Met She Error: 0.00 usft Survey Program: BO -GCT -MS Rule Assigned; NOERRORS OR»t Well Error. a0D 9sfl Reference Olhe Semi Major Aals Measured VMmal Measured Vertical Reference Ouse Tooda. meet Welnere CeBrc Casing- Centra to No" Allowable Depth Deprb Depth Depth AHmuth MLS eEl-W Hole Size Centre Distance Wamin9 Oayiatlon (.sit) (usm luso) (.an) 4 -Aft) (undo fl IusXl lusnl (in) lusnl lusnl lusnl 8,742.% 863560 s7e)00 0,650.47 065 043 46.88 43501 30557 0.000 25.27 Ido 2527 Pass -NOERRORS 8.763.50 a652 07 8775.00 6,674% 0.08 0.50 816] 43985 307Q 0.000 3692 534 38.92 Pass-NOERRORS 8.779.57 %663.78 8,800.00 8,89951 0.12 0.57 -54.22 -444.10 31035 0000 50.31 5.97 5031 Pass-NOERRORS 8795.35 8.674.48 %825.00 8,724.02 0.17 065 -56.71 448.38 31270 0,000 85.33 658 65)3 Pass -NOERRORS 8.8011 8,683.32 8,850.00 8,748.52 023 0.73 -5870 '452.69 31522 0.000 81.70 7.07 81.70 Pass - NOERRORS 8102200 8,690.80 %875.00 9,77102 0.29 060 -6033 457.04 317.71 0600 99.18 749 99.18 Pass - NOERRORS 8,833.24 8,6%60 8,900.00 8,79749 035 0.08 8170 -461.47 32020 0600 117.57 785 117.57 Pass -NOERRORS 8,83850 8.69924 8,925.00 8.02194 0.38 0.98 62M -065.98 322.83 0.000 136.88 8.02 138.88 Pass -NOERRORS %852.27 8,705.62 a850.00 8,&038 0.47 164 -6382 -47055 325.41 0000 150.60 042 15660 Pass -NOERRORS s.%3.50 8.710.25 8.97560 8,870.83 054 1.07 -64.% 47513 32798 Dow 177.12 872 177.12 Pass-NOERRORS 8.%3.% 8,710.25 9,00060 6,895.27 0.54 1.12 8543 479.73 330.50 DOW 198.12 872 198.12 Pass -NOERRORS %87403 8714.10 9,025.00 8.919.71 0.62 1.18 %30 .48432 33305 0000 21945 899 21945 Pass-NOERRORS 8,879.91 8.716 Do 9,050.00 8,944.16 0.66 1.23 66.91 .48891 33559 0600 24122 913 24122 Paas-NOERRORS 8,808.% 8,71061 9,075.00 0.9%.60 073 1.28 87.61 493.50 330.13 0.000 28136 932 28338 Pass- NOEIRORS, CC, ES. SI %88850 8,71961 91100.00 8199304 0.73 134 b797 490.09 34068 0.000 28570 9.32 285.70 Pass-NOERRORS 8,088.50 8,71861 9,10560 8,997.93 073 1.35 -67.92 -499.01 341.18 0.000 290.22 8.32 29022 Pass-NOERRORS CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 61192017 10:45: FOAM Page 3 COMPASS 5000.1 Build 61D r by BP Travelling Cylinder Report ri.2 BAKER Company: North America - ALASKA - BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay NO Reference: Mean Sea Level Reference Site: PB DS 04 MD Reference: 53 : 38 8/21/1991 00:00 @ 53.00usft (generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: 0438 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 04-38A Database: EDM R5K-Alaska PROD -ANCP1 Reference Design: 04-38A WP08 Offset ND Reference: Offset Datum reference Depths are relative to 53: 38 821/1991 00:00 @ 53.00usft ( Coordinates are relative to: 04-38 )ffset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK / lentral Meridian is 150° 0' 0.000 W Grid Convergence at Surface is: 1.62' S Ladder Plot L - ---- --- -,---- I I I I I i I _ J I I 1 I I I I I ' ' � I 1500 3000 4500 6000 7500 9000 Measured Depth -+- 04-38,04,38,04-38V1 LEGEND CC -Min centre to center distance or covergent point, SF -min separation factor, ES - min ellipse separation 6/19/201710.45:10AM Page 4 COMPASS 5000.1 Build SID t)bp BP EARN N Travelling Cylinder Report RAM NUGNES Company: North America - ALASKA - BP Local Coordinate Reference: Well 04-38 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB DS 04 MD Reference: 53: 38 8/21/1991 00:00 (03 53.00usft (generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: 0438 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 04-38A Database: EDM RSK- Alaska PROD -ANCP1 Reference Design: 04-38A WPOB Offset ND Reference: Offset Datum Reference Depths are relative to 53: 38 8/21/1991 00:00 @ 53.00usft ( Coordinates are relative to: 04-38 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27.OGP-Usa AK / Central Meridian is 150" 0'0.000 W Grid Convergence at Surface is: 1.62 ° Separation Factor Plot 9.00 i ------------- i_____________i_____________i ____________1i_ I O i m 6.00- 0 .00 0 o � i m G _____ ------------ __________ -- 3.00— L i 0.00 0 2000 4000 6000 8000 Measued Depth LEGEND —9— 04-38,134-38,04-38\11 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 671912017 1045: 10AM Page 5 COMPASS 5000.1 Build 81D 'f ♦BP ,�.. Zby Travelling Cylinder Report BAKER ee S HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 04 Site Error: 0.00 usft Reference Well: 0438 Well Error: 0.00 usft Reference Wellbore 04-38A Reference Design: 04-38A WP08 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 0438 Mean Sea Level 53 : 38 8/21/1991 00:00 @ 53.00usft (generic drilling dg) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum teference Depths are relative to 53 : 38 8/21/1991 00:00 @ 53.00usft ( Coordinates are relative to. 04-38 Jftset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27.OGP-Usa AK / ]entral Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 1.62' 300 270 240 Travelling Cylinder_- P- Pot 315 -_ 330 30 / 270 - A 223 180 ,135 45 \ 90 180. '— - 25 270 210 _-- 150 180 Azimuth from North['] vs Centre to Centre Separation [150 usft(in] LEGEND f 04-38.04-98,0438v1 ME 120 90, CC - Min centre to center distance or oovergent point, SF - min separation factor, ES - min ellipse separation 611 912 01 7 10,45 10AM Page 6 COMPASS 5000.1 Build 81D A�� f Z bps "oot ` Project: Prudhoe Bay Sire: PBDS04 Well: 0438 Wellbore: 043111 Plan: 0 M WP08 Plus 600R M D(0438N 38x11 a,n p..ass.w' Lnemxo':t�n Mee.kFW w O9�1�lR oY/AI' aoms�v WELLBORE DETAILS: 043BA nrs+Farawwawnou 0438A �(K) Pehrnce MOOD Trus"' Vs.pWlefveae. uas, 5®L" PmeM Wellbore' 0438 Seem W)Rahn. Sat. 0 MR DAM Ta.MD'. BS88.50 MewadDWnFehiace. 53390Rllf991W W®59AOn9(pm�s Aig CakuhWn Lb" lane can.wn FJam— Fad BAKER -----.ES Mean Sea Level ": bp"00#05 North America - ALASKA - BP Prudhoe Bay PB DS 04 04-38 04-38A 04-38A WP08 Plus 500ft MD AOGCC Offset Well Report 19 June, 2017 riFag BAKER HUGHES "00+0 b p Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 04 Site Error: 0.00usft Reference Well: 0438 Well Error: O.00usft Reference Wellbore 04-38A Reference Design: 04-38A WP08 Plus 50011 MD BP FORM Anticollision Report BAKFJt NVGM Local Co-ordinate Reference: Well 04-38 TVD Reference: Mean Sea Level MD Reference: 53: 38 8/21/1991 00.00 @ 53.00usft (generic drilling rig) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K-Alaska PROD -ANCP1 Offset TVD Reference: Offset Datum Reference 04-38A WPO8 Plus 50011 MD Filter type: GLOBAL FILTER APPLIED: All welipaths within 200'+ 100/1000 of reference WARNING: There is hidden tight data in this project Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic Survey Tool Program Date 6/19/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 80.20 8,588.50 1 : Schlumberger GCT multishot (04-38) GCT -MS Schlumberger GCT multishot 8,588.50 10,671.53 04-38A WPOB Plus 500ft MID(04.38A)MWD MWD -Standard Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) PB DS 04 0408 - 04-08 - 04-08 3,378.84 3,375.00 154.50 04-09 - 0409 - 04-09 3,077.76 3,075.00 69.16 04-09-04-09PB1-04-09PB1 3,077.76 3,075.00 69.16 0410-04-10-04-10 2,649.13 2,650.00 76.94 04 -38 -04 -38A -04-38A WPO8 10,171.53 10,171.53 0.00 6/19/2017 1:38:28PM Page 2 of 24 COMPASS 5000.1 Build 81D TRANSMITTAL LETTER CHECKLIST WELL NAME: '2d '4_ PTD: 7,(:7 —&2�s_ /Development _ Service _ Exploratory _ Stratigraphic Test Non -Conventional FIELD: POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name (_PH) and API number (50- _-_) from records, data and logs acquired for well name onpermit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first cau t and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing ro am. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 da s after com letion, sus ension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field 8 Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY _UNLT 04 38A - Program DEV - Well bore seg ❑ I - — -- PTD#:2170980 Company BP EXPLORATION (ALASKA).INC._ __ Initial Class/Type DEV1_PEND GeoArea 890 Unit 11650 _ On/Off Shore On Annular Disposal ❑ Administration 17 18 1 19 2 3 4 21 5 6 7 23 8 9 10 Appr Date 11 12 SFD 6/30/2017 27 13 Date 14 VTL 15 29 16 Nonconven. gas conforms to A531,05.0300A.A).0.2.A-D) Permit fee attached. - - - Leasenumberappropriate - - Unique well. name and number - Well located in -a defined pool. Well located proper distance from drilling unit. boundary Well located proper distance from other wells- - Sufficient acreage available in drilling unit. If deviated, is wellbore plat. included Operator only affected party Operator has appropriate bond in force Permit can be issued without conservation order - Permit can be issued without administrative approval Can permit be approved before 15 -day wait... Well located within area and strata authorized by Injection Order# (put 10# in. comments) (For All wellswithin1/4 mile area of review identified (For service well only) Pre -produced injector: duration of pre -production less than 3 months (For. service well only) conductor Stringprovided Surface casing protects all. known USDWs - CMT vol adequate to circulate on conductor & surf csg CMT vol adequate to tie-in long string to surf csg CMT will cover all known productive horizons - - Casing designs adequate for C, T, B & permafrost Adequate tankage or reserve pit If re -drill, has a 10-403 for abandonment been approved Adequate wellbore separation proposed If divener required, does it meet regulations Drilling Fluid program schematic .& equip. list. adequate BOPEs,.do they meet regulation BOPE press rating appropriate; test to (put psig in comments) Choke manifold complies w/API RP -53 (May 84) Work will occur without operation shutdown Is presence of H2S gas probable Mechanical condition of wells within AOR verified (For service well only) Permit can be issued w/o hydrogen sulfide measures Data presented on potential overpressure zones Seismic. analysis of shallow gas zones Seabed condition survey (if off -shore) Contact name/phone for weekly progress reports [exploratory only] - NA NA - Yes Yes Yes Yes Yes- Yes Yes Yes Yes Yes Yes Yes NA NA NA NA NA NA NA Yes Yes Yes Yes Yes NA Yes Yes Yes Yes Yes Yes NA No Yes NA NA NA Geologic Date: Engineering Date 7 Pu Icc Date Commissioner: Commis of Entire Well lies within ADL0028325. PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341F CO 341 F, Rule 2:. There shall be no restrictions as to well spacing. except that. no pay shall be - - opened in a well closer than 500 feet to the boundary of the affected. area. Planned well conforms to CO 341 F, Rule 2..... Conductor set for PBU 04-38 Surface casing set in PBU 04-38 Surface casing set and fully cemented Productive. interval will be completed with cemented liner and perforated Rig has steel tanks; all waste. to approved disposal wells PTD 191-112, Sundry 317-292 Anti -collision analysis complete; no major risk failures Max formation. pressure is 3354 psig(7.3 ppg EMW); will drill w/ 8.4 ppg EMW MPSP is 2474 psig; will test BOPS to 3500 psig H2S measures required DS 04 wells are 1-12S -bearing. H2S measures. are required. Planned drilling mud program (about 8.4 ppg) appears adequate to control operator's forecast pore pressure. gradient (about 7.3 ppg). Should higher pore pressures be encountered, BP has immediate access to nearby fluid. mixing facilities. 18 Engineering 19 20 21 22 23 24 25 26 27 Appr Date 28 VTL 7/7/2017 29 30 31 32 33 34 35 Geology 36 Appr Date 37 SFD 6/30/2017 38 39 Nonconven. gas conforms to A531,05.0300A.A).0.2.A-D) Permit fee attached. - - - Leasenumberappropriate - - Unique well. name and number - Well located in -a defined pool. Well located proper distance from drilling unit. boundary Well located proper distance from other wells- - Sufficient acreage available in drilling unit. If deviated, is wellbore plat. included Operator only affected party Operator has appropriate bond in force Permit can be issued without conservation order - Permit can be issued without administrative approval Can permit be approved before 15 -day wait... Well located within area and strata authorized by Injection Order# (put 10# in. comments) (For All wellswithin1/4 mile area of review identified (For service well only) Pre -produced injector: duration of pre -production less than 3 months (For. service well only) conductor Stringprovided Surface casing protects all. known USDWs - CMT vol adequate to circulate on conductor & surf csg CMT vol adequate to tie-in long string to surf csg CMT will cover all known productive horizons - - Casing designs adequate for C, T, B & permafrost Adequate tankage or reserve pit If re -drill, has a 10-403 for abandonment been approved Adequate wellbore separation proposed If divener required, does it meet regulations Drilling Fluid program schematic .& equip. list. adequate BOPEs,.do they meet regulation BOPE press rating appropriate; test to (put psig in comments) Choke manifold complies w/API RP -53 (May 84) Work will occur without operation shutdown Is presence of H2S gas probable Mechanical condition of wells within AOR verified (For service well only) Permit can be issued w/o hydrogen sulfide measures Data presented on potential overpressure zones Seismic. analysis of shallow gas zones Seabed condition survey (if off -shore) Contact name/phone for weekly progress reports [exploratory only] - NA NA - Yes Yes Yes Yes Yes- Yes Yes Yes Yes Yes Yes Yes NA NA NA NA NA NA NA Yes Yes Yes Yes Yes NA Yes Yes Yes Yes Yes Yes NA No Yes NA NA NA Geologic Date: Engineering Date 7 Pu Icc Date Commissioner: Commis of Entire Well lies within ADL0028325. PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341F CO 341 F, Rule 2:. There shall be no restrictions as to well spacing. except that. no pay shall be - - opened in a well closer than 500 feet to the boundary of the affected. area. Planned well conforms to CO 341 F, Rule 2..... Conductor set for PBU 04-38 Surface casing set in PBU 04-38 Surface casing set and fully cemented Productive. interval will be completed with cemented liner and perforated Rig has steel tanks; all waste. to approved disposal wells PTD 191-112, Sundry 317-292 Anti -collision analysis complete; no major risk failures Max formation. pressure is 3354 psig(7.3 ppg EMW); will drill w/ 8.4 ppg EMW MPSP is 2474 psig; will test BOPS to 3500 psig H2S measures required DS 04 wells are 1-12S -bearing. H2S measures. are required. Planned drilling mud program (about 8.4 ppg) appears adequate to control operator's forecast pore pressure. gradient (about 7.3 ppg). Should higher pore pressures be encountered, BP has immediate access to nearby fluid. mixing facilities.