Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout217-1187. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU L-205A Extended Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 217-118 50-029-23388-01-00 7595 Conductor Surface Intermediate Production Liner 4593 124 2878 7536 7382 20" 10-3/4" 7-5/8" 4517 48 - 171 47 - 2925 46 - 7582 48 - 171 47 - 2658 46 - 4588 None 1500 2480 4790 7382 3060 5210 6890 6200 - 7469 4-1/2" 12.6# 13cr85 43 - 7398 4115 - 4548 Structural 4-1/2" HES TNT Packers 6109, 4085 / 6215, 4120 / 6648, 4263 / 6838, 4327 / 6979, 4377 / 7140, 4432 / 7320, 4495 6109, 6215, 6648, 6838, 6979, 7140, 7320 4085, 4120, 4263, 4327, 4377, 4432, 4495 Torin Roschinger Operations Manager Tyson Shriver tyson.shriver@hilcorp.com 907-564-4542 PRUDHOE BAY, Schrader Bluff Oil, Orion Dev Area Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028241, 0028329 43 - 4522 N/A N/A 68 618 243 373 156 0 642 1048 342 367 323-459 13b. Pools active after work:Schrader Bluff Oil, Orion Dev Area No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 12:30 pm, Aug 28, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.08.28 06:01:50 -08'00' Torin Roschinger (4662) RBDMS JSB 083123 DSR-8/28/23WCB 4-9-2024 ACTIVITY DATE SUMMARY 8/19/2023 LRS CTU #2 - 2.0" Blue Coil Job Objective: Ext. AddPerf MIRU CTU. Make up logging BHA with 2-7/8" carrier and 3.25" JSN drift. L&K the well with 2% KCL & safelube. RIH and tag XXN plug at 7362' CTM / 7382' MD. Log up at 50 FPM to 5800'. Paint red flag at ~ 6800'. POOH and confirm good data (+15' correction). Continue well kill with MCHF of 0.5 bpm. Deploy Perf gun BHA. ...Continued on WSR 8-19-23... 8/19/2023 LRS Well Testing Unit 6, Begin WSR, IL Well L-205 / OL Well L-01, Unit Move, STBY, Cont WSR to 8-20-23 8/20/2023 LRS CTU #2 - 2.0" Blue Coil ***Cont from WSR 8-19-23*** Job Objective: Ext. AddPerf Deploy perf gun BHA with 432' of 2-7/8" Maxforce perf guns, 6 spf, 60 deg phase (167' loaded for 4 intervals). Tie-in to XXN plug and perforate the 4 intervals 6943'- 6972', 7106'-7135', 7251'-7313', and 7328'-7375'. POOH and lay down the guns (ball recovered, all shots fired in scallop). Freeze protect the tubing to 2500' TVD with diesel. RDMO. ***Job Complete*** 8/20/2023 T= 40 (PERFORATING) Assist LRS CTU #2 - Pumped 2 bbls of 60/40, followed by 150 bbls of Safe Lube to kill well. Pumped 97 bbls of Safe Lube at 0.5 bpm to assist Coil while working downhole. CTU in control of well upon departure. Final T= Vac 8/20/2023 LRS Well Testing Unit 6, Begin WSR, IL Well L-205 / OL Well L-116, Cont. STBY, RU, Cont WSR to 8-20-23 8/21/2023 LRS Well Testing Unit 6, Continue WSR from 8-20-23, IL Well L-205 / OL Well L- 116, RU, PT, Flowback, Cont WSR to 8-22-23 8/22/2023 LRS Well Testing Unit 6, Continue WSR from 8-21-23, IL Well L-205 / OL Well L- 116, Flowback, Cont WSR to 8-23-23 8/23/2023 LRS Well Testing Unit 6, Continue WSR from 8-22-23, IL Well L-205 / OL Well L- 116, Flowback, Cont WSR to 8-24-23 8/24/2023 LRS Well Testing Unit 6, Continue WSR from 8-23-23, IL Well L-205 / OL Well L- 116, Flowback, 8hr PBWT, RD, Job Complete, End WSR on 8-24-23 Daily Report of Well Operations PBU L-205A j Deploy perf gun BHA with 432' of 2-7/8" Maxforce perf guns, 6 spf, 60 deg phaseyggg (167' loaded for 4 intervals). Tie-in to XXN plug and perforate the 4 intervals 6943'-()g 6972', 7106'-7135', 7251'-7313', and 7328'-7375'. POOH 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU L-205A Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 217-118 50-029-23388-01-00 ADL 0028239 7595 Conductor Surface Intermediate Production Liner 4593 124 2878 7536 7382 20" 10-3/4" 7-5/8" 4517 48 - 171 47 - 2925 46 - 7582 48 - 171 47 - 2658 46 - 4588 none 1500 2480 4790 7382 3060 5210 6890 6200 - 7469 4-1/2" 12.6# 13Cr85 43 - 73984115 - 4548 Structural 4/1/2" HES TNT Perm No SSSV Installed Date: Torin Roschinger Operations Manager Tyson Shriver Tyson.Shriver@hilcorp.com (907) 564-4545 PRUDHOE BAY 8/17/2023 Current Pools: SCHRADER BLUF OIL Proposed Pools: SCHRADER BLUF OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov (7) 6109, 6215, 6648, 6838, 6979, 7140, 7320 / 4085, 4120, 4263, 4327, 4377, 4432, 4495 1560 By Grace Christianson at 3:37 pm, Aug 14, 2023 323-459 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.08.14 12:20:34 -08'00' Torin Roschinger (4662) DSR-8/14/23 10-404 Orion A.Dewhurst 16 AUG 2023 Orion MGR15AUG23 1560 CO 505B GCW 08/16/2023JLC 8/16/2023 08/17/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.08.17 08:04:53 -05'00' RBDMS JSB 081723 Extended Add Perf Well:L-205A PTD:217-118 API:50-029-23388-01-00 Well Name:L-205A API Number:50-029-23388-01-00 Current Status:Shut in Rig:Coil Estimated Start Date:8/17/2023 Estimated Duration:2days Regulatory Contact:Carrie Janowski Revision:0 First Call Engineer:Tyson Shriver (907) 564-4542 (O)(406) 690-6385 (M) Second Call Engineer:Josh Stephens (907) 777-8420 (O)(970) 779-1200 (M) Current Bottom Hole Pressure:1,960 psi @ 4,400’ TVD 8.57 PPGE | Based on Offsets Maximum Expected BHP:2,000 psi @ 4,400’ TVD 8.74 PPGE | Original Pressure Max. Anticipated Surface Pressure:1,560 psi Based on 0.1 psi/ft. gas gradient Last SIWHP:1,227 psi Taken 07/18/2023 Min ID:3.725” ID 4-1/2” XN Nipple Max Angle:71 Deg @ 4,580’ MD taken from well plan Tie In Log:Halliburton RMT3D Log, Dated 04 May 2018 Brief Well Summary: L-205A is a 1st generation cased hole frac pack designed with NCS frac ports and sliding screened sleeves to help control production from the various Schrader Bluff sands. Mechanically, the system worked as planned for placing the frac packs. However, after POP rates quickly fell off. Diagnostics revealed the gravel packs were not connected to the fracs that were pumped. Since the well was brought online, it has struggled with hydrates and paraffins. It is suspected that the frac pack and screens are inducing mechanical skin as well. Eline attempted the perforation 8/10/2023 but were unable to reach target depth due to deviation. Objectives: Perforate OBd, OBc and OBb screens to bypass any screen/mechanical skin and connect to the fracs. Procedure: Coiled Tubing Notes: x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 1. Shut-in offset injectors L-220 and L-221 48 hours prior to arrival. 2. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 3. MU lubricator to BOPs. 4. Bullhead kill the well with 8.4 ppg 1% KCl. 5. Monitor wellhead pressure response post bullhead kill for 30 minutes to identify overbalance requirements. If wellhead pressure is not stable after 30 minutes continue monitoring for stabilization. Max tubing pressure is 2,500 psi for bullhead kill. a. Wellbore volume to assumes PBTD of 7,582’ = 161 bbls b. 4-1/2” Tubing – (6,109’ – surface) X 0.0152 bpf = 93 bbl c. 7-5/8” Line – (7,582’ – 6,109’) X 0.0459 bpf = 68 bbl 6. MU and RIH with GR/CCL and drift nozzle. Log from XXN plug at 7,382’ MD to above SSD at 6,031’ MD. 7. Flag pipe as appropriate per WSS for addperf runs. Extended Add Perf Well:L-205A PTD:217-118 API:50-029-23388-01-00 8. POOH and confirm good log data. 9. At surface, prepare for deployment of TCP guns. 10. Bullhead kill well with KWF determined from initial well kill. 11. Confirm well is dead. Maintain hole fill taking returns to tank until lubricator connection is re- established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 12.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 13.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Perf Schedule *Planned for 2-7/8” Halliburton MaxForce charges, max swell 3.047” (in liquid), 12.41#/ft loaded weight. Perf Interval Perf Length Gun Length Weight of Loaded Guns (lbs) Comments Run 1 7,328’ – 7,375’47’47’583 lbs (12.41 ppf) Run 1 7313’ – 7,251’62’62’769 lbs (12.41 ppf) Run 1 7,135’ – 7,106’29’29’360 lbs (12.41 ppf) Run 1 6,972’ – 6,943’29’29’360 lbs (12.41 ppf) Run 1 Blank Sections 0’265’N/A All blank sections Total 167’432’Total length <500 ft 14. MU lubricator connection at QTS. 15. RIH with perf gun and tie-in to coil flag correlation. Pick up and perforate interval per Perf Schedule above. a. Note any tubing pressure change in WSR. 16. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface. 17. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 18. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 19. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 20. RDMO CTU. 21. RTP or FP well. Attachments: 1. Current Wellbore Schematic 2. Proposed Schematic 3. Annotated Tie-in Log 4. Coil Tubing BOPE Schematic 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Equipment Layout Diagram 7. Sundry Change Form Extended Add Perf Well:L-205A PTD:217-118 API:50-029-23388-01-00 Current Wellbore Schematic Extended Add Perf Well:L-205A PTD:217-118 API:50-029-23388-01-00 Proposed Wellbore Schematic Extended Add Perf Well:L-205A PTD:217-118 API:50-029-23388-01-00 Annotated Tie-in Log Extended Add Perf Well:L-205A PTD:217-118 API:50-029-23388-01-00 Extended Add Perf Well:L-205A PTD:217-118 API:50-029-23388-01-00 Extended Add Perf Well:L-205A PTD:217-118 API:50-029-23388-01-00 Extended Add Perf Well:L-205A PTD:217-118 API:50-029-23388-01-00 Coiled Tubing BOPs Extended Add Perf Well:L-205A PTD:217-118 API:50-029-23388-01-00 Standing Orders for Open Hole Well Control during Perf Gun Deployment Extended Add Perf Well:L-205A PTD:217-118 API:50-029-23388-01-00 Equipment Layout Diagram Extended Add Perf Well:L-205A PTD:217-118 API:50-029-23388-01-00 Sundry Change Form Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approved By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS MIrl 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations. shutdown '' yam°' ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Reddll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Pull PX Plug 8 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development El Exploratory ❑ 5. Permit to Drill Number: 217-118 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratignaphic ❑ Service ❑ 1 6. API Number: 50-029-23388-01-00 7. Property Designation (Lease Number): ADL 028239 & ADL 028241 8. Well Name and Number: PBU L -205A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, SCHRADER BLUF OIL 11. Present Well Condition Summary: Total Depth: measured 7595 feet Plugs measured 7382 feet true vertical 4593 feet Junk measured None feet Effective Depth: measured 7382 feet Packer 6109,6215,8648,8838 feet measured 6979'71Q: 7320 true vertical 4517 feet Packer true vertical 4085.4120 4263, 4327 feet b, 4432.4495 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 124 20' 48-171 48-171 3060 1500 Surface 2878 10-3/4" 47-2925 47-2658 5210 2480 Intermediate Production 7536 7-5/8" 46-7582 46-4588 6890 4790 Liner Perforation Depth: Measured depth: 6200-7469 feet True vertical depth: 4115-4548 feet Tubing (size, grace, measured and true vertical depth) 4-1/2" 126# 13Cr85 43-7398 43-4522 Packers and SSSV (type, measured and 4-112" HES TNT Perm Packer (7) 6109, 6215, 6648, 6838 4085, 4120, 4263, 4327 true vertical depth) 6979, 7140, 7320 4377, 4432, 4495 No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or injection Data Oil -B01 Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 108 152 0 833 354 Subsequent to operation: 241 164 17 870 372 14. Attachments: (r u,m per 26 MC 25.070250]1,&25260) 15. Well Class after work. Daily Report of Well Operations ® Exploratory ❑ Development EI Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil (Z Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ IGSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name: Youngmun, Alex Contact Name: Youngmun, Alex Authorized Title: Kuparuk & Schrader Bluff PE Contact Email: younak(r7)BP.com Authorized Signature: tlC ( MVO Date: /41 ( Contact Phone: +1 907 564 4864 m�Rcg4�rc� ( ' Form 10-404 Revised 04/2017 RBDMS�MAR 1 41019SuSmil Original Only of Well O /ELL S/I UPON ARRIVAL**** (Injectivity test) 3.80" CENT. & 2.50" S. BAILER & SAT DOWN EARLY @ 6,002' SLM (unable to pass) 4-1/2" BRUSH & 3.50" G. RING & SAT DOWN @ 6,560' SLM 3.80" CENT. & 2.50" S. BAILER & SAT DOWN @ 6,570' SLM (ft pin sheared from prong) .ED 4-1/2" PX PLUG FROM 6,576' SLM / 6,606' MD ELL LEFT SHUT IN, PAD -OP NOTIFIED*** = 4 WELLHD= 11'FMC AC4TO= Mff0 -E 76 .1' RETBOKB 94.43' . BFELEV 48.83' KOP= 380' Max Angle = 72" @ 4895' Datum ND= 7320' Datum TVD= 4400'SS 10-3/4^ FLAT HEAT TRACE CABLE w /-525 CLAMPS /ozrn) 2! = 9.95" -=_2 :LOGAl RA TAG 7-5/8" CSG COLLAR i- 6008' Minimum ID = 3.725" @ 7382' 4-1/2" HES XN NIPPLE RA TAG 4-1/2^ TUBNG COLLAR 6054' SAFETY NOTES: NCS FRAC PORT 96 @ 6115' W OULD ONLY DRIFT TO THE SAME AS AN X -NIP (DRIFT ID = 3.803") "'NOTE: GRAVEL PACK COMPLETED TO 6 ZONES. ALL NCS FRAC PORTS ARE CLOSED. ALL NCS SCREEN SLEEVES ARE OPEN (04125/18)••' 'NOTE: MAX PUMP RATE IS 1 BPM: THIS IS TO PREVENT FROM PUSHING THE PACK INTO THE FORMATION. CONTACT APE IF 1 BPM IS TO BE EXCEEDED""' PERFORATDN SUIMTMRY REF LOG: BC CMT EVAL LOG ON 12/11/17 ANGLE AT TOP PERF: 71'@6200' Note: Refer to Production DB for historical pert data -SIZE LIFT SPF ZONE INTERVAL Opn/Sgz DATE 4.625" 5 M 6200-6205 O 12/09/17 4.625" 5 OA 6633-6638 O 12/09/17 4.625" 5 OBa 6823-6828 O 12/09/17 4.625" 5 OBb 6964-6969 O 12/09/17 4.625" 5 OBc 7126-7131 O 12/09/17 4.625" 5 OBd 7305-7310 O 12/09/17 4.625" 5 1 OBe 1 7454-7469 C 12/09/17 4-1/2" TBG, 12.6#, 13CR-85 VAM TOP .0152 bpf, D = 3.958" 7-5/8" CSG, 29.7#, 13 -CR VAM TOP HC/L-80 VAM TOP HC, D = 6.875" L -205A `C ROMECSG&TB(7""MA: WELL R DLS:133.9° @ 2941' 2037' 4-12" HES X NP, D = 3.813" MLLOUT WINDOW (L -205A) 2925' - 2941' 60- 31' 4-1/2" DURASLV SLD SLV w/XPROW 1 6188' 1 DATE REV BY 00"4 NTS DATE REV BY COMMENTS 0222104 N96S ORIGINAL COMPLETION IGAS 1125/09 0-18 RWO 1123118 JMG/J PULL® GAUGES & SET PX FLIX; 12N417 P-272 SIDETRACK (L -205A) -fRff 02/25/19 LIFT MANDRELS 07/31/18 AY/JM) AODED SAFETY NOTE RE BUW RATE 08/13/18 LG/JM) FULLED PX RUG (08/09/18) ST MD TYPE VLV LATCH PORI DATE 4 3 2 1 2631 3573 4853 5921 T402271 KBG2 KBG2 KBG2 KBG2 DONE DOME DOME SO BK BK BK BK 12 16 16 20 04/30/18 04/30/18 04/30/18 04/30/18 MLLOUT WINDOW (L -205A) 2925' - 2941' 60- 31' 4-1/2" DURASLV SLD SLV w/XPROW 1 6188' 1 DATE REV BY 00"4 NTS DATE REV BY COMMENTS 0222104 N96S ORIGINAL COMPLETION 10/08/18 JCF/JMJ SET DHSR ON X -LOCK & SET XXN FLOG 1125/09 0-18 RWO 1123118 JMG/J PULL® GAUGES & SET PX FLIX; 12N417 P-272 SIDETRACK (L -205A) -fRff 02/25/19 07/16/18 JLS/JM) CIO (07/09/18) M VJKU FULL®PX FLOG (0222/19) 07/31/18 AY/JM) AODED SAFETY NOTE RE BUW RATE 08/13/18 LG/JM) FULLED PX RUG (08/09/18) SGM-NDPGCA SINGLE DROP SAPPHIRE �E, D = 3.864- 'X .864"'X 4-1/2" HES TNT PKR, D = 3.856" NCS FRAC PORT, HES X NP, ID - 3.813" NCS SCREEN SLEEVE D = 3.958" X 4-1/2' HES TNT PKR, ID = 3.856" NCS FRAC PORT, D = 3.958 - HES X .958"HESX NIP,D=3.813" NCS SC----------------- REIIJ SLEEVED = 3.958" X 4-1/2" HES TNT PKR, D = 3.856' NCS FRAC PORT, D = 3.958" HES X NP, ID = 3.813" 1\ Jl"RC JL.0 U=J 'X 4-1/2" FES TNT PKR, D = 3 NCS FRAC PORT, D = 3.958" HESX NP,D=3.813" NCS SCREE! SLEEVE, ID = 3 X 4-1/2" HES TNT PKR, ID = 3 NCS FRAC PORT, D = 3.958" HES X NIP, NCS SCREEN SLEEVE D = 3 X 4-1/2" FES TNT FKR, D = 3 NCS FRAC PORT, D = 3.958 - HES X .958"HESX NP,D=3.813" NCS SCREEN SLEEV E D = 3. X 4-112" HES TNT PKR, ID = 3. HES XN NP, XXN RUG (10/01/18) WLEG. D = 3.958" ORION UNIT WELL: L -205A PERMIT No: 217-118 AR No: 50-029-23388-01 SEC 34, TI 2N, R11 E, 2361' FSL & 3786' FEL BP Exploration (Alaska)