Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
217-154
Jeremy Price Digitally signed by Jeremy Price Date: 2021.10.05 13:06:19 -08'00' Daniel Seamount Digitally signed by Daniel Seamount Date: 2021.10.05 13:47:38 -08'00' Page 1 of 5 Hilcorp North Slope, LLC Tommy Nenahlo GPMA Reservoir Engineer 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: 907/777-8424 tnenahlo@hilcorp.com August 12th, 2021 Jeremy Price, Chair Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 RE: Prudhoe Bay Unit, Raven Oil Pool: Request for Administrative Approval to Amend CO 570.011 for modification to GOR Waiver Dear Chair Price: The defined area of the Raven Oil Pool (ROP) currently produces under Conservation Order 570.011 (CO 570.011) which contains a gas/oil ratio (GOR) waiver based on an ongoing Enhanced Oil Recovery (EOR) project in the pool under 20 AAC 25.240(b)(1). The NK-65A injector has been the sole source of injection in the pool since October 2005. During this time the greater Raven area has been undergoing initial development with ultimate Raven Pool boundaries undefined at this time. Two wells, which are outside the defined area of the ROP (NK-14B and NK-08B) are producing under a GOR waiver via 25.240(b)(3) for acquisition of performance data in order to define an optimum reservoir management plan. In this application, Hilcorp North Slope LLC, as operator of the Prudhoe Bay Unit, respectfully seeks Administrative Approval under Rule 14 within CO 570.011 for the re-categorization of the defined area of the ROP to: 1. Produce under GOR waiver via 25.240(b)(3) in support of development of the greater Raven area, and 2. That the wells within the currently defined ROP as well as the NK-08B and NK-14B tract operations produce under a common GOR waiver The North and Central Raven blocks are within the defined area of the ROP as shown in Figure I. To improve the ultimate recovery of these blocks the proposed plan is to convert NK-65A to assess the recovery potential of the Ivishak and Sag rich gas. This plan to improve the ultimate recovery is predicated upon the following: • The Ivishak oil reservoir in the North and Central Raven fault blocks are at or near maturity • Rich gas potential exists in the Sag River formation, as proven by the recent NK-15A conversion • The production data collected from conversion of NK-65A to a rich gas producer will provide the necessary information to progress the development of the greater Raven area. The North and Central Raven blocks were developed with four development wells. The North Raven block was developed with the NK-65A injector and NK-38A producer. In 2016, the North Raven block reached maturity and the NK-38A was subsequently sidetracked into the Central Raven block, becoming the NK- 38B producer. In 2018, the NK-15A sidetrack was drilled into the Central Raven block to complete the development of the Central Raven block. However, when NK-15A was drilled the Ivishak was found to be swept by waterflood. As the NK-15A is a horizontal well, the area logged within the block was extensive, both vertically and laterally. Furthermore, when the Ivishak was tested in the NK-15A well it was found to be primarily sea water, which could have only come from the NK-65A injector [Figure II]. Page 2 of 5 Hilcorp North Slope, LLC The logs, production test, and water chemistry from NK-15A show the Central Raven block in this area has reached maturity from NK-65A’s water injection. The NK-38B is nearing maturity, with water cuts currently at approximately 95%. The pressure and GOR at NK-38B have remained relatively constant throughout the life of the producer. As NK-65A has been shut in since May of 2020, the pressure support can be attributed to gas cap expansion and aquifer encroachment. Therefore, the small amount of remaining recoverable reserves associated with NK-38B will be recovered without the support of the NK-65A injector. As no further utility in the Ivishak was identified, in 2020 the Sag River formation at NK-15A was tested as evidence suggested rich gas potential that could result in recovery of additional saleable hydrocarbons. This test was successful and the NK-15A was converted to a Sag Rich Gas producer [Figure III]. Cumulative production from November 2020 to July 2021 is 140 thousand stock tank barrels of oil and the well is currently producing 700 barrels of oil per day. With the conversion of NK-65A to production, the timeline for development will be as follows: • Produce NK-65A for 30 calendar months, collecting production and pressure data o An assessment of the greater Raven area development plan will be completed within this 30-calendar month period o An assessment of an enhanced oil recovery project to support the production from the NK- 08B and NK-14B tract operations, the currently defined ROP, as well as the greater Raven area will be completed within this 30-calendar month period • An application for expansion of the Raven Oil Pool at the end of the 30-calendar month period will be submitted, if warranted The 30-calendar month period will provide two winter drilling seasons at Niakuk to assess the greater Raven area development potential for potential expansion of the Raven Oil Pool. Please contact me at 907-777-8424 or via email at tnenahlo@hilcorp.com if there are further questions. Sincerely, Tommy Nenahlo GPMA Reservoir Engineer Hilcorp North Slope, LLC cc: Dave Roby, Sr. Reservoir Engineer, Alaska Oil and Gas Conservation Commission ConocoPhillips Alaska, Inc. ExxonMobil Alaska Production, Inc. Chevron U.S.A., Inc. Page 3 of 5 Hilcorp North Slope, LLC Figure I: Raven Oil Pool Page 4 of 5 Hilcorp North Slope, LLC Figure II: North & Central Raven Block GeoChem Analysis [Ivishak Produced Water]. Increasing Sulfates and decreasing Barium concentrations are indicative of increasing sea water production as a percentage of total water production. The trend of production transitioning from connate water to sea water can be seen with the NK-38A water chemistry data. Page 5 of 5 Hilcorp North Slope, LLC Figure III: NK-15A Sag Rich Gas Production DATA SUBMITTAL COMPLIANCE REPORT 815/2019 Permit to Drill 2171540 Well Name/No. PRUDHOE BAY UN NIA NK -088 Operator BP Exploration (Alaska) Inc. API No. 50-029-22491-02-00 MD 19858 TVD 10064 Completion Date 4/22/2019 Completion Status 1 -OIL Current Status 1 -OIL UIC No REQUIRED INFORMATION Mud Log No ✓ Samples No Directional Survey Yes DATA INFORMATION List of Logs Obtained: MWD/GR/RES,MWD/GR/RES/DEN/NEU/Caliper-Main Bore, No logs/survey obtained for NK-08BPB1 (from Master Well Data/Logs) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH/ Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 30866 Digital Data 9625 19858 5/31/2019 Electronic Data Set, Filename: NK- 08B_BHGE_LTK_MEM _Composite _FE Drilling Data.las ED C 30866 Digital Data 5/31/2019 Electronic File: NK- 08B_BHGE_LTK_2MD_Memory Drilling Log.cgm ED C 30866 Digital Data 5/31/2019 Electronic File: NK- 08B_BHGE_LTK_2TVDSS_Memory Drilling Log.cgm ED C 30866 Digital Data 5/31/2019 Electronic File: NK- 08B_BHGE_LTK_5MD_Memory Drilling Log.cgm ED C 30866 Digital Data 5/31/2019 Electronic File: NK- 08B_BHGE_LTK_5TVDSS_Memory Drilling Log.cgm ED C 30866 Digital Data 5/31/2019 Electronic File: NK - 086 BHGE_LTK_MEM_Composite_FE Drilling Data.dls ED C 30866 Digital Data 5/31/2019 Electronic File: NK- 08B_BHGE_LTK_2MD_Memory Drilling Log.pdf ED C 30866 Digital Data 5/31/2019 Electronic File: NK- 08B_BHGE_LTK_2TVDSS_Memory Drilling Log.pdf ED C 30866 Digital Data 5/31/2019 Electronic File: NK- 08B_BHGE_LTK_5MD_Memory Drilling Log.pdf ED C 30866 Digital Data 5/31/2019 Electronic File: NK- 08B_BHGE_LTK_5TVDSS_Memory Drilling Log.pdf ED C 30866 Digital Data 5/31/2019 Electronic File: NK-08B_BHGE Final Report Surveys.csv AOGCC Page 1 of 2 Monday, August 5, 2019 DATA SUBMITTAL COMPLIANCE REPORT 8/5/2019 Permit to Drill 2171540 Well Name/No. PRUDHOE BAY UN NIA NK -08B Operator SP Exploration (Alaska) Inc. API No. 50-029-22491-02-00 MD 19858 TVD 10064 Completion Date 4/22/2019 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 30866 Digital Data 5/31/2019 Electronic File: NK-08B_BHGE Final Report Surveys.pdf ED C 30866 Digital Data 5/31/2019 Electronic File: NK-088_BHGE Final Report Surveys.txt Log C 30866 Log Header Scans 0 0 2171540 PRUDHOE BAY UN NIA NK -08B LOG HEADERS Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report O Directional / Inclination Data O Production Test InformatiorTY NA Mechanical Integrity Test Information Y / NA Geologic Markers/Tops O Daily Operations Summary O COMPLIANCE HISTORY Completion Date: 4/22/2019 Release Date: 2/20/2019 Description Date Comments: Compliance Reviewed By - t r � _ Comments Mud Logs, Image Files, Digital Data Y /CJ Core Chips Y/6 Composite Logs, Image, Data FilesYO Core Photographs Y / C Cuttings Samples Y / AA Laboratory Analyses Y /A - - _ Date: AOGCC Page 2 of 2 Monday, August 5, 2019 21 71 54 e of Alaska - AOGCC 0 0 n Natural Resources Technician W. 7th Ave, Suite 100 horaee, Alaska 99501 IDNR- Division of Oil &Gas, *** V I u I t I D I I :Attu: Garret Brown :550 West 7th Avenue, Suite 1100 ;Anchorage, Alaska 99501 ««« Stamp ".................... _.._........ ....... ............................... .... 'BP Exploration (Alaska) Inc. 0 0 O Q 0 'Petrotechnical Data Center, LR2-1 1900 E. Benson Blvd. 'Anchorage, Alaska 99508 30866 BAER PRINT DISTRIBUTION LIST UGHES a GE company Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc. BP Exploration (Alaska) Inc. Petrotechnical Data Center, L12-1 WELL NAME NK -08B 900 E. Benson Blvd. Anchorage, Alaska 99508 or GANCPDC@USAANC.hou.xwh.BP.com FIELD Niakuk to acknowledge receipt of this data. COUNTY PRUDHOE BAY LOG TYPE GR-RES-DEN-NEU BHI DISTRICT Alaska -- LOG DATE April 17, 2019 AUTHORIZED BY Paul Canizares EMAIL Paul.Canizares(fthae.COm TODAYS DATE May 30, 2019 Revision STATUS Final Replacement: No Details: Rev. Requested by: --- COMPANY FIELD/ FINAL CDIDVD FINAL PRELIM (las, dlis, PDF, META, SURVEY REPORT ADDRESS(FEDEX N' LL NOT DELVER TO P.O. BOX) LOGS LOGS CGM, Final Surveys) (Compass) PERSON ATTENTION #OFnPRINTS FKINn COPIESn #OFCOPIES #OF V V n#OF nCOPIES V V V V t :,BP North Slope. Q Q O O O 'EOA, PBOC, PRB-20 (Office 109) :D&C Wells Project Aides ;Atm: Benda Glassmaker & Peggy O'Neil :900 E. Benson Blvd. :Anchorage, Alaska 99508 COwcoPh0lips Alaska lc. O i 02 O Aftn: Ricky Elgariet, ATO 3-344 788GStreet RECEIVED :Anchorage, AK 99510 : E' V 3 ExxonMobtl, Alaska O 0 MAY 3 112niQ0 10 Attn: Lynda M. Vaskell and/or Lisa Boggs ^ '3201 C Street, Suite 505 O G C C ''.Anchorage, AN 99503 e of Alaska - AOGCC 0 0 n Natural Resources Technician W. 7th Ave, Suite 100 horaee, Alaska 99501 IDNR- Division of Oil &Gas, *** V I u I t I D I I :Attu: Garret Brown :550 West 7th Avenue, Suite 1100 ;Anchorage, Alaska 99501 ««« Stamp ".................... _.._........ ....... ............................... .... 'BP Exploration (Alaska) Inc. 0 0 O Q 0 'Petrotechnical Data Center, LR2-1 1900 E. Benson Blvd. 'Anchorage, Alaska 99508 W"%ski L.9 V 116—B STATE OF ALASKALASKA OIL AND GAS CONSERVATION CONINIIS� _ WELL iMP ETION OR RECOMPLETION REPOT AND LOG MAY 2 0 2019 la. Well Status: Oil 0 Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ We Qr% 20AAC 25.105 20AAC 25.110 \LRc• 11b. OS_1R Dee n p tory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One Service ❑ Slretigrephic Test ❑ 6. Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry 2. Operator Name: BP Exploration (Alaska), Inc 4/222019 217-154 3. Address. T Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 3/27/2019 50-029-22491.02-00 4a. Location of Well (Governmental Section): 6. Date TO Reached: 16. Well Name and Number: 4/15/2019 PBU NK -08B Ref Elevations 17. Field/Pool(s): Surface: 1266' FSL, 1099' FEL, Sec. 36, 1-12N, R15E, UM . 9 KB 67 45 Top of Productive Interval: 4602' FSL, 225' FEL, Sec. 26, T12N, R15E, UM GL 19,77 gF 22.17 PRUDHOE BAY RAVEN OI t1 7 Te r 10. Plug Back Depth(MDITVD): 18, Properly Designation: Total Depth: 428' FSL, 3372' F1NL, Sec. 24. T12N, R15E, UM • 19679' / 10040' ADL 0346308 034625 11. Total Depth (MD/TVD): 19. DNR Approval Number: 41b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 721465 y- 5979799 Zone - ASP 4 19858'110064' 84-062 12. SSSV Depth (MD/TVD)'. 20Thickness of Permafrost MD/TVD: TPI: x- 716805 y- 5988282 Zone - ASP 4 - Total Depth: x- 720368 y- 5989492 Zone - ASP 4 2053'/1987' 1900' (Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No ❑ 13. Water Depth, if Offshore: 21. ReAnII/Lateral Top Wlndow MDr-VD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 9776'/ 6084' 22, Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma my, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD / GR / RES, M44D / OR / RES / DEN / NEU / Caliper- Main Bore, No logs / survey obtained for NK-DBBPBI 23, CASING, LINER AND CEMENTING RECORD CASING WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20'• 94# H -4o 46' 128' 48' 128' 30" 260 sx Arctic Set (Approx.) 13-3/8" 68# NT -80 48' 5813' 48' 4151' 16" 1890 sx PF'E', 375 sx Class'G' 9-5/8" 47# W -Bos 45' 9776' 45' 6084' 12-1/4" 400 sx Class'G', 185 able AS II 7" 26# L-ro 9600' 15935' 6005' 9880' 8-12"x9-1/4" 509 sx Class'G' 4-1/2" 12.6# t3cres 15760' 19856' 9734' 10064' 6-1/8" 461 sx Class'G' 24. Open to production or injection? Yes 0 No ❑ 25. TUBING RECORD GRADE DEPTH SET (MD) PACKER SET (MD/TV If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): 4-1/2" 12.6# 13Cr85 15770' 1 15649'/ 9841' 2-718" Gun Diameter, 6 sof 4/19/2019 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 17220'- 17420' 1119934' 17570'- 17910' 9936'- 9935' COMPLETION 18000' - 18500' 9932' - 9942' Was hydraulic fracturing used during completion? Yes ❑ No D 18570'- 19130' 9950'- 9985' Per 20 AAC 25.283 (i)(2) attach electronic and printed 19180'- 19500' 9989'- 10022' 11 ZZ zoirA information VERIFIED DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED H —2500 Freeze Protect w/ 20 Bible Diesel 27. PRODUCTION TEST Date First Production May 1, 2019 Method of Operation (Flowing, gas lilt, am.): Flowing Date of Test 5/7/19 H...Tested Productionfor Oil -Bbl: Gas -MCF: Water -Bbl: Choke Sbp Gas -Oil Ratio: 4 Test Period —111471 1826 32 176 3877 Flux Tubing 620 Casino Press: Cakulated Oil -B51: Gas -MCF: Water -Bbl: Oil Gravity- API(wm: Press 1084 24 Hour Rate --► 2825 1 10955 189 WA Form 1D-407 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only ,8 4*47 ���, t�GG%-f� l7 RBDMSdLtA/ MAY 2 12019 Gr 28. CORE DATA I Conventional Corals) Yes ❑ No IZ ( Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No 0 Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 Top of Productive Interval 15922' 9869' AAC 25.071. West Bak 12126' 7133' Colville Mudstone 12870' 7465' Hi 14852' 8973' Kuparuk 15100' 9181' Kingak 15444' 9469' Sag River 15922' 9869' Shublik 16037' 9961' Sadlerochit-Zone 4 16134' 10028' CGL - Zone 3 16175' 10052' Base of CGL - Zone 2 16242' 10088' Zone 3 (Invert) 16860' 10086' Zane 4 16967' 10050' Shublik 17032' 10028' Sag River 17224' 9964' Formation at total depth: ' Sag River (From Base) 17224' 9964' 31. List of Attachments: LOT / FIT Summary, Summary of Daily Drilling Reports, Survey, Cement Report, Wellbore Schematic Survey Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Nocas, Noel Authorized Title: SlefSp4alist Contact Email: No21.Nocas@bp.com Authorized Signature: Date: /.I Contact Phone: +1 9075645027 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b. Well Class Service welts: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this forth and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-007 Revised 512017 Submit ORIGINAL Only 19ff= �-v18'�"15K vauuO= rNc AGTNTG3= rneanL o>aia�v= e9a Bf 17]3 W.ee1= - —_ ztfr MIT ZIW 6 )IM lAA-LAID rr Any.= 11nOf9n9 on.nw= ur3r ONnNO= 9IDP59 1 13-318" CSG, 689, N-80, NSCC, 1)= 12.415- 1 Minimum ID = 3.725" @ 157ST 4-112" HES XN NIPPLE 19-5/8' CSG. 47#, NT -80S NSOC. ID = 8.681" I ITOP OF 4-12"LNR I TBG, 12.60, 13CR-85 VAM TOP, L-80 VT HC, 0383 bpf, D = 8.278" BUUNII01191M.NR! Ioa-LIX2 BIQi IXi1R/�K liL6.l W WI&18 AN[iE/�TIOPPH�: l08' ®17131' N mRo9ucmn ®Ivhsd�a9ai4am 1: s� srf rneanL cNsa are 9 17]3 O WM9 ZIW 6 )IM lAA-LAID O W9 28TJ 8 Z11W 18000-tai09 09 19 29x1 8 -19139 O 0918119 28iY 8 Mw 1918D -185W O DVIy19 4-12" LNR 12.6#.l 3CR45. VAM TOP, .0152 bot. D = 3.958" SAFEr-•IOTES: WEt 1 oEGMESA SSSi- WELLANGLE NK -08B LNRIPERFS P&A d ARE OT SHOWN ON DIADGItAkL CHROME TBG& LNR- GAS LFT MANDRELS ST MD I TVD I DEV I TYPE VLV LATCH PORT DATE 75694 4093 60 MMG DOME RK 16 047J0119 5 9415 5920 63 MMG SO RK 20 D4130/19 5 11605 6908 64 KBG-2 DMY BK 0 0421/19 4 13007 7539 56 KBG-2 DMV BK 0 0421/19 3 13821 8107 36 KBG-2 DMY BK 0 0121/19 2 14516 8692 33 K8G2 DMY BK 0 0421/19 1 15297 9346 33 KBG-2 DMY BK 0 0421/19 I9 -W X 7" VAM TOP LM w/NIFD HGR & TIEBACK SLEEVE. D = 6.1IN M LLOUT W14DOW (NK48B) 9776'-9790' BMD TT NOT LOGGED NWKUK UNIT WELL: NK -08B PERMIT No: 217-154 ARNO50-029-22491-02 SI3; 36, Tl 2N, R15E, 1266' NSL, 1099' W EL DATE REV BY OOM ENTS DATE !EV BY COMMENTS 08131/94 ONGINAL COMPLETION 0520119 JNL/JMD EDM3) OKB, REF & P9?F DATE 04/09/01 MG SIDETRACK (NK -08A) 0422/19 P-272 MG SIDETRACK(W-086) 04130119 JMD DRLG DRAFT OOMiBCTIDNS 05/07/19 OJWJM) GLV C40 (0413W19) BP Exploration (Alaska) 05/15119 NWJMD FINAL ODEAPPROVAL Page 1 of 1 BP AMERICA LOT / FIT Summary Well Name: NK-08BPB1 Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD -Ft) (TVD -Ft) (ppg) (psi) (BHP) (psi) (ppg) 03/27/19 LOT 9,859.00 6,124.91 9.50 950.00 3,971.14 12.49 Page 1 of 1 Page 1 of 1 BP AMERICA LOT / FIT Summary Well Name: NK -08B Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD -Ft) (TVD -Ft) (ppg) (psi) (BHP) (psi) (ppg) 03/31/19 LOT 9,776.00 6,08406 9.60 1,02000 4,054.10 12.83 04/12/19 FIT 15,957.00 9,898.26 940 625.00 5,450.51 1062 Page 1 of 1 Winston, Hugh E (CED) From: Roby, David S (CED) Sent: Tuesday, May 21, 2019 3:06 PM To: Winston, Hugh E (CED); Guhl, Meredith D (CED) Subject: RE: Change in reporting for PBU NK -14B (PTD 217-005) For 14B the 407 and the production reports should show only the Sag undefined in the geo-tab since the completed interval is entirely outside the defined ROP. For 8B the 407 and production reports should show the well in both the ROP and the sag undefined. Dave Roby 907-793-1232 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Dave Roby at 907- 793-1232 or dave.robvPalaska.gov. From: Winston, Hugh E (CED) Sent: Tuesday, May 21, 2019 2:05 PM To: Guhl, Meredith D (CED) <meredith.guhl@alaska.gov> Cc: Roby, David S (CED) <dave.roby@alaska.gov> Subject: FW: Change in reporting for PBU NK -14B (PTD 217-005) This was that 407 that I just brought over. In the prod-geo tab there is just the ROP (640147) under pools encountered. Should I add in the Sag undefined pool as well? Huey From: Roby, David S (DOA) Sent: Monday, April 15, 2019 3:20 PM To: AOGCC Reporting (DOA sponsored) <aoecc.reporting alaska.eov> Subject: Change in reporting for PBU NK -14B (PTD 217-005) The subject well is currently reporting production to the Raven Oil Pool (640147) but is actually completed in a portion of the Sag River formation that is outside of the ROP. Can you please let your contact at BP know to start reporting production for this will against the Sag River Undefined Oil Pool (640165)? Do we need BP to submit revisions for the past production, or can we just go into RBDMS and change the field and pool code for the roughly year and a half of production we have for this well? On a related note, BP is currently drilling the NK -08B well (PTD 217-154) that's going to be completed across the ROP boundary, so it'll be reporting production for both the ROP and the Sag Undefined pool based on the completion length on either side of the boundary. We're going to tell them in a GOR waiver letter that's going out shortly to do this split this way. The well should come on line next month so we won't see any production from it until we get the reports in June. North America - ALASKA - BP Operation Summary Report Common Well Name: NK -08 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/22/2019 End Date. 4/16/2019 Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM Rig Contractor: PARKER DRILLING CO. Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) AFE No 0 -0199F -C: (8,452,503.00 ) BPUOI: USA00001319 Page 1 of 35 1 Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations 0800 - 1030 2.50 (hr) _ (usft) WAIT FOR ROADS AND PADS TO CLEAR THE 3/22/2019 05:00 - 08:30 3.50 MOB P 1.40 PRE GENERAL RIG DOWN OPERATIONS ON FROM JACOBS YARD THROUGH THE EAST GUARD SHACK TO THE INTERSECTION WITH WEST DOCK ROAD PHASE 2 CONDITIONS LIFTED AT 04:30. 16-14C STOP AT THE INTERSECTION WITH WEST DOCK ROAD AND STAGE MODULES TO ALLOW TRAFFIC TO PASS 1.40 PRE MOVE ALL 3 RIG MODULES ALONG SPINE - DISCONNECT INNER CONNECTS ON 1.40 PRE STAGE MODULES AND WAIT AT TARMAC CAMP FOR ROADS AND PADS TO CLEAR ROADS AND GIVE APPROVAL TO CONTINUE RIG MOVE MODULES '- SKID RIG FLOOR - LOWER MAST TO HEADACHE RACK - PREP MODULE FOR MOVE WBS:MOB RELEASE FROM 16-14C AT 05:00 HRS ON 03/2_2/2019"' 08:30 - 12:00 3.50 MOB P 1.40 PRE MOVE RIG FROM DS16 THROUGH DS17 TO THE SAG RIVER ICE ROAD 1200 - 0000 12.00 MOB N 1.40 PRE HALT RIG MOVE ON SAG RIVER DUE TO HIGH 'WINDS -MUD MODULE ON WEST SIDE OF RIVER - DRILL MODULE AND UTILITY MODULE ON SAG RIVER ICE ROAD - WINDS EXCEED DESIGN LIMITS FOR RIG MOVE AND UNABLE TO MAINTAIN SAFE WORKING PRESSURES ON TIRES. PHASE 2 WEATHER CONDITIONS CALLED AT 1200 3/23/2019 00:00 - 02:00 2.00 MOB N 1.40 PRE CONTINUE TO WAIT ON WEATHER _ _ CONDITIONS TO IMPROVE 0200 - 0300 1.00 MOB P 1.40 PRE MOVE MODULES TO JACOBS YARD ON WEST 0300 - 0430 1.50 MOB N 04.30 - 0600 1.50 MOB P 0600 - 0700 1.00 MOB P .07:00 - 08:00 1.00 MOB P 0800 - 1030 2.50 MOB N Printed 5/9/2019 8:50:33AM **Ali depths reported In Drillers Depths" SIDE OF SAG RIVER ICE ROAD - FIELD STILL REMAINS IN PHASE 2 WEATHER CONDITIONS - WINDAND VISIBILITY IMPROVED ENOUGH TO CONTINUE TO MOVE UTILITY MODULE AND DRILL MODULE ACROSS SAG RIVER ICE ROAD. 1.40 PRE WAIT FOR ROADS AND PADS TO CLEAR THE ROADS AND GIVE APPROVAL TO CONTINUE THE RIG MOVE TO NK -08 FIELD STILL REMAINS IN PHASE 2 WEATHER CONDITIONS 1.40 PRE CONTINUE MOVING ALL THREE MODULES FROM JACOBS YARD THROUGH THE EAST GUARD SHACK TO THE INTERSECTION WITH WEST DOCK ROAD PHASE 2 CONDITIONS LIFTED AT 04:30. 1.40 PRE STOP AT THE INTERSECTION WITH WEST DOCK ROAD AND STAGE MODULES TO ALLOW TRAFFIC TO PASS 1.40 PRE MOVE ALL 3 RIG MODULES ALONG SPINE ROAD TO TARMAC CAMP TURNOFF 1.40 PRE STAGE MODULES AND WAIT AT TARMAC CAMP FOR ROADS AND PADS TO CLEAR ROADS AND GIVE APPROVAL TO CONTINUE RIG MOVE Printed 5/9/2019 8:50:33AM **Ali depths reported In Drillers Depths" North America - ALASKA - BP Pa9e 2 of 35 l Operation Summary Report Common Well Name: NK -08 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/22/2019 End Date* 4/16/2019 X3 -0199F -C: (8,452,503.00 ) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Him Task Code NPT (hr) 1030 - 1600 5.50 MOB P 16:00 - 17:30 1.50 17:30 - 18:30 1.00 18.30 - 1930 1.00 19.30 - 2030'. 1.00 MOB P Total Depth Phase Description of Operations (usft) _ 1.40 PRE CONTINUE RIG MOVE WITH ALL 3 MODULES TO NK -O8 SIMOPS: - SPOT DUMMY WELL HOUSE OVER NK OB 1.40 PRE SPOT DRILL MODULE OVER NK -08 - VERIFY E -STOP FUNCTION PRIOR TO MOVING OVER WELL - MARRY UP UTILITY MODULE AND MU MODULE TO DRILL MODULE MOB P 1.40 PRE RIG UP INNER CONNECTS AND MAKE UP ELECTRICAL CONNECTIONS AND STEAM CONNECTIONS MOB P 1.40 PRE RAISE THE DERRICK - INSPECT DERRICKAND VERIFY CHECKLIST FOR RAISING DERRICK COMPLETE : - DERRICK OFF THE RACK AT 500 KLBS MOB P 1.40 PRE SKID THE RIG FLOOR FROM DERRICKOVER POSITION TO WELL CENTER Printed 5/912019 8:50:33AM "All depths reported in Drillers Depths" - MOVE HAUNCH AND INSTALL - RAISE PIPE CAT - INSTALL HANDRAILS AND LANDINGS ON RIG 20:30 - 21:00 0.50 MOB PRE 'PERFORM RIG E-STOP(BLACKOUT) TEST P _FLOOR 1.40 WITH ELECTRICIAN 21:00 - 22:00 1.00 MOB P 1.40 PRE RIG UP RIG FLOOR EQUIPMENT - INSTALL MAN RIDERS AND PIN IN PLACE -INSTALL OFF-LINE MOUSE HOLES - RIG UP RIG FLOOR LINES - SPOT CUTTINGS BOX AND RIG UP STEAM LINES - SPOT FLOW BACK TANKAND RIG UP HARD LINE -TAKE ON FLUIDS FOR PIT CALIBRATION 22.00 - 23.00 1.00 MOB P 1.40 PRE BRIDLE DOWN - REMOVE BRIDLE LINESAND HANG IN DERRICK - HOOK UP BLOCKS TO TOP DRIVE - INSTALL TORQUE TUBE PIN - CALIBRATE TOTCO PVT SYSTEM WBS:RU ACCEPT RIG AT 23:00 HRS ON 03/23/2019 23:00 - 00:00 1.00 MOB P 1.40 PRE CALIBRATE BLOCKSAND CHECK CROWN-O-MATIC _ 3/24/2019 00:00 - 01:00 1.00 WHSUR P 1.40 PRE RIG UP TO TEST TWC FROM BELOWAND ABOVE - RIG UP SECONDARY KILL TO IA - OPEN TO GAUGE ON TREE - TEST SURFACE LINES TO 4500 PSI WITH MUD PUMP: GOOD 01:00 - 01:30 0.50 WHSUR P 1.40 PRE ATTEMPT TO PRESSURE TEST TWC FROM BELOW TO 4000 PSI - PRESSURE UP WITH MUD PUMP THROUGH IA -AT 1500 PSI (5 BBLS PUMPED) OBSERVE PRESSURE ON TREEAT 1300 PSI -SHUT DOWN WITH PRESSURE ON IAAND Printed 5/912019 8:50:33AM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 3 of 35 Common Well Name: NK -08 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/22/2019 End Date: 4/16/2019 X3 -0199F -C: (8,452,50300) Project: Niakuk Site: NK Rig Name/NO.: PARKER 272 Spud Date/Time. 7/14/1994 12:OO.00AM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ 01:30 - 0200 0.50 WHSUR N 1.40 PRE SEAT POPPET ON LEAKING TWC - RIG UP HOSE FROM TREE TO BLEED TRAILER - BLEED OFF PRESSURE ON TREE QUICKLY TO BLEED TRAILER AND SEAT POPPET ON TWC 02:00 - 03:00 1.00 WHSUR P 1.40 PRE CONTINUE TO PRESSURE TEST TWO FROM BELOWANDABOVE TO 4000 PSI FOR CHARTED MIN -TEST FROM BELOW WITH MUD PUMP TO 4000 PSI: GOOD TEST - TEST FROM ABOVE WITH TEST PUMP TO 4000 PSI: GOOD TEST _ 0300 - 0330 0.50 WHSUR P 1 40 PRE BLOW DOWN LINES AND RIG DOWN TEST EQUIPMENT _ I SUCK OUT TREE 03:30 - 04:30 I 1.00 WHSUR P 1.40 PRE RIG EVACUATION / H2S DRILL WITH RIG CREW 04:30 - 06:00 1.50 WHSUR P 1.40 PRE NIPPLE DOWN ADAPTER FLANGE AND TREE PER FMC REPRESENTATIVE - BLEED OFF HANGER VOID AND TERMINATE CONTROL LINES PER FMC - NIPPLE DOWN TREE AND ADAPTER FLANGE AND RAISE TO BOP DECK - FUNCTION LOCK DOWN SCREWS AND GLAND NUTS - INSPECT HANGER THREADS (GOOD) AND MAKE UP XO (7.5 TURNS) 06:00 - 07:30 1.50 BOPSUR P 1.40 PRE NIPPLE UP BOP STACKAND HIGH PRESSURE RISERS - NIPPLE UP RISER ON WELLHEAD - NIPPLE UP BOPS STACK ON RISER - INSTALL LOW PRESSURE RISERS - ATTACH TURNBUCKLES AND CENTER STACK - CONNECT FLOW LINE AND HOLE FILL LINES - AIR UP AIR BOOTS -INSTALL MOUSE HOLE 07:30 - 08:30 1.00 BOPSUR P 1.40 PRE RIG UP TO TEST BOPE - MAKE UP TEST JOINTS AND FOSV ASSEMBLIES FILL STACKAND PURGEAIR FROM SYSTEM 0830 - 1430 6.00 BOPSUR P 1.40 PRE PRESSURE TEST BOP T 250/5000 PSI FOR 5 CHARTED MIN EACH -TESTANNULAR PREVENTER TO 25013500 PSI FOR 5 CHARTED MIN EACH - TEST WITH 2-7/8" AND 5" TEST JOINTS - TEST GAS ALARMS, PVT AND FLOW SHOW TEST WITNESS WAIVED BY AOGCC REPRESENTATIVE BOB NOBLE AT 06:43 HRS ON 03/24/2019 ALL TESTS WITNESSED BY RIG MANGER OR WSL SEEATTACHEDTEST CHARTS 1430 - 1500 0.50 BOPSUR P 1.40 PRE RIG UP TO PULLTWC WITH LUBRICATOR - INSTALL DUTCH RISER - LOAD LUBRICATOR TOOLS IN PIPE SHED Printed 5/912019 8:50:33AM •*AII depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 4 of 35 Common Welt Name. NK -08 AFE No Event Type: RE-ENTER- ONSHORE (RON) Stan Date. 3/22/2019 Eno Date 4/16/2019 X3 -0199F -C'. (8,452,503 00 ) Project: Niakuk Site: NK - MAKE UP LUBRICATOR TO DUTCH RISER Rig Name/No.: PARKER 272 Spud Date/Time. 7/14/1994 12:00 OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @87.45usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) 17:00 - 18:00 1.00 BOPSUR P (usft) DECOMP 15:00 - 17:00 2.00 BOPSUR P 7.40 PRE PULL AND LAY DOWN TWC WITH Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths** LUBRICATOR - MAKE UP LUBRICATOR AND EXTENSIONS - MAKE UP LUBRICATOR TO DUTCH RISER AND PRESSURE TEST 3500 PSI FOR 5 MIN: GOOD TEST - PULL AND LAY DOWN TWC - RIG DOWN LUBRICATOR AND DUTCH RISER 17:00 - 18:00 1.00 BOPSUR P 1.40 DECOMP HOLD RIG EVACUATION / H2S DRILLAND PRE -SPUD MEETING WITH YEAROUT'S CREW WBS:DECOMP 10:00 - 18:30 0.50 CASING P 1.40 DECOMP RIG UP TO PULL4-1/2" 1BT-M TUBING - RIG UP HYDRAULIC SPOOLER - RIG UP CASING TONGS -CALIBRATE BLOCKS WITH BAKER MWD 1830 - 2000 1.50 CASING P 9,879.40 DECOMP CIRCULATE OUT DIESEL FREEZE PROTECT PUMP 50 BBLS OF 8.5 PPG 3% KCL DOWN THE IA TAKING RETURNS TO THE CUTTINGS TANK - 7 BPM, 1150 PSI - SHUT DOWN AND VERIFY CLEAN 8.5 PPG OUT PUMP 220 BBLS OF 8.5 PPG 3% KCL DOWN THE TUBING TAKING RETURNS TO THE FLOW BACKTANK - 7 BPM, 850 PSI -SHUT DOWN TO MONITOR WELL, WELL OUT OF BALANCE Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths** Common Well Name: NK -08 Event Type: RE-ENTER- ONSHORE(RON) Project: Niakuk North America - ALASKA - BP Operation Summary Report Start Date: 3/22/2019 End Date: 4/16/2019 Site: NK AFE No K3 -0199F -C:(8,452,503.00) Page 5 of 35 Rig Name/No.: PARKER 272 Spud Daterrime: 7/14/1994 12,00 OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @87.45usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 2000 - 0000 4.00 CASING N 9,879.40 DECOMP CIRCULATETOGET THE WELL IN BALANCE OBSERVE FLUID LEVEL CONTINUE TO DROP BELOW THE WELLHEAD ON THE TUBING SIDE. IA STILL FLOWING TO THE FLOW BACK TANK - FILL TUBING WHEN FLUID LEVEL DROPS BELOW WELL HEAD SEVERAL TIMES - FLUID CONTINUES TO FLOW TO THE FLOW BACKTANK - PUMPED AN ADDITIONAL 250 BELS OF 8.5 PPG 3%KCL DOWN THE TUBING - PULL 290 BBLS OF DIESEL / KCL OFF THE TIGER TANK FOR HYDROCARBON RECYCLE - CALL OUTADDITIONAL 3% KCL FROM HOT ,WATER PLANT 'CLOSE BLIND/SHEAR RAMS AND PUMP AN ADDITIONAL 80 BBLS DOWN THE TUBING TAKING RETURNS TO FLOW BACK TANK -4 BPM, 250 PSI - SHUT DOWN AND CLOSE VALVE TO FLOW 'BACKTANK !- WELL STILL OUT OF BALANCE 40 PSI ON IA LINE TO FLOW BACK TANK, TUBING OPEN TO ATMOSPHERE TOTAL 8.5 PPG 3% KCL PUMPED DOWN TUBING = 550 BBLS ANNULAR VOLUME OF 9-5/8" x 4-1/2" TO TUBING CUTAT 9878' MD = 529 BBLS TUBING VOLUME TO CUT AT 9878' MD = 150 BBLS VOLUME IN TUBING AND ON IA BELOW CUT = 163 BBLS WAIT FOR ADDITIONAL FLUIDS TO ARRIVE ON LOCATION AND FOR DIRTY DIESEL/ KCL RETURNS TO BE SUCKED OUT OF FLOW BACK TANK. SIMOPS: - BUILD STANDS OF 5" DRILL PIPE WITH OFF-LINE STAND BUILDING EQUIPMENT Printed 5/9/2019 8:50:33AM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 6 of 35 Common Well Name. NK -06 9,879.40 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 3/22/2019 End Date: 4/16/2019 X3 -0199F -C'. (8,452,503,00 ) Project: Niakuk Site: NK CASING P Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00 OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI. USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) (usft) _ 3/25/2019 00:00 01:30 1.50 CASING N 9,879.40 DECOMP CONTINUE TO BRING ON FLUIDS, MAKE ROOM IN FLOW BACK TANKAND ATTEMPT TO GET WELL IN BALANCE 01.:30 - 02:30 1.00 CASING 02:30 - 03:30 1.00 0330 - 0490 0.50 0400 - 0500 1.00 05 00 - 0630 1.50 PUMP AN ADDITIONAL 200 BELS DOWN THE TUBING TAKING RETURNS TO FLOW BACK TANK - 7 BPM, 950 PSI - SHUT DOWN AND CLOSE VALVE TO FLOW BACK TANK WELL STILL OUT OF BALANCE I- 40 PSI ON IA LINE TO FLOW BACK TANK, TUBING OPEN TO ATMOSPHERE - 8.5 PPG IN, 8.4 PPG WITH DIESEL OUT TOTAL 8.5 PPG 3% KCL PUMPED DOWN TUBING = 750 BBLS SIMOPS: - BUILD STANDS OF 5" DRILL PIPE WITH _ 'OFF-LINE STAND BUILDING EQUIPMENT N 9,879.40 �I� DECOMP WAIT FOR ADDITIONAL FLUIDS TO ARRIVE FROM HOT WATER PLANT AND FOR EMPTY DIRTY VAC TRUCKS TO MAKE ROOM IN FLOW BACKTANK SIMOPS: - BUILD STANDS OF S' DRILL PIPE WITH OFF-LINE STAND BUILDING EQUIPMENT CASING N 9,879.40 DECOMP PUMP AN ADDITIONAL 200 BBLS DOWN THE TUBING TAKING RETURNS TO FLOW BACK TANK - 7 BPM, 950 PSI - SHUT DOWN AND MONITOR WELL FOR 10 MIN: STATIC - 8.5 PPG IN, 8.5 PPG OUT TOTAL 8.5 PPG 3% KCL PUMPED DOWN TUBING = 950 BBLS SIMOPS: - BUILD STANDS OF 5" DRILL PIPE WITH OFF-LINE STAND BUILDING EQUIPMENT CASING P 9,879.40 DECOMP RIG DOWN AND BLOW DOWN LINES TO FLOWBACKTANK _ CASING P 9,879.40 DECOMP RIG UP AND PULL TUBING HANGER TO RIG FLOOR. - ENGAGE TUBING HANGER WITH XO AND 5" DRILL PIPE - BACK OUT LOCK DOWN SCREWS -HANGER FREE WITH 115_ KLBS CASING P 9,879.40 DECOMP CIRCULATE 35 BBL SOAP PILL SURFACE TO SURFACE - 15 BPM, 1000 PSI Printed 5/9/2019 8:50:33AM **All depths reported in Dfillers Depths" North America - ALASKA - BP Page 7 of 35 Operation Summary Report Common Well Name. NK -08 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Dale: 3/22/2019 End Date: 4/16/2019 X3 -0199F -C'. (8,452,503.00) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/rime: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ 0630 - 1700 10.50 CASING P 8,879.40 DECOMP PULLAND LAY DOWN 4-1/2", 12.6 LB/FT IBT-M TUBING FROM CUT AT 9878' MD - TERMINATE CONTROL LINE - LAY DOWN TUBING HANGER AND 5" DRILL PIPE - PU 115 KLBS AT 9878' MD - LAY DOWN A TOTAL OF 247 FULL JTS, 2 GLM j 'ASSEMBLIES, 1 SSSV, 1 (T) PUP JOINTAND 1 (36.34') CUT JOINT GOOD CUT, NO FLARE 17:00 - 18:00 1.00 CASING P 9,879.40 DECOMP RIG DOWN DOYON CASING TONGS AND ''ELEVATORS. REMOVE TUBING FROM PIPE SHED 1800 - 1830 0.50 CASING P 9,879.40 DECOMP SERVICE TOP DRIVE, BLOCKSAND WASH PI PE 18:30 - 19:30 1.00 _ _ WHSUR P 9,879.40 DECOMP RIG UP TO PULL 9-5/8" CASING PACK -OFF i- MAKE UP RUNNING TOOL TO 2 JOINTS OF S" HWDP -SUCK OUT STACK - RUN IN THE HOLE AND ENGAGE PACK -OFF 19:30 - 00:00 4.50 WHSUR N 9,879.40 DECOMP BLEED OFF GAS FROM OA BEFORE PULLING PACK -OFF - NOT ENOUGH PRESSURE TO REGISTER ON OA PRESSURE GAUGE - BLEED OFF THROUGH 2" LINE TO FLOW j BACKTANK SIMOPS: - BUILD STANDS OF 5" DRILL PIPE UTILIZING OFF-LINE STAND BUILDING EQUIPMENT 3/26/2019 0000 - 01:30 1.50 WHSUR N 9,879.40 DECOMP CONTINUE TO BLEED OFF OA PRIOR TO PULLING 9-5/8" CASING PACK -OFF - VERIFIED WITH HANDHELD GAS METER 0 LEL, 0 H2S, 0 CO AND 02 DID NOT CHANGE FROM BACKGROUND LEVELS SIMOPS: - BUILD STANDS OF 5" DRILL PIPE UTILIZING OFF-LINE STAND BUILDING EQUIPMENT 01:30 - 03:30 2.00 WHSUR P 9,879.40 DECOMP PULLAND LAY DOWN 9-5/8" CASING PACK -OFF - BACK OUT LOCK DOWN SCREWS PER FMC REPRESENTATIVE - WORK UP TO 40 KLBS IN 2 Ki INCREMENTS, NO MOVEMENT - RIG UP STEAM BLANKET AND WARM UP SPOOL WHILE PULLING 40 KLBS - DISCUSS WITH FMC AND AGREE TO WORK UP TO 70 KLBS - WORK UP TO 70 KLBS IN 2-5 KLBS INCREMENT - PACK -OFF SLOWLY PULLED FREE WITH 70 KLBS - PULL PACK -OFF TO RIG FLOOR AND LAY DOWN SIMOPS: - BUILD STANDS OF 5" DRILL PIPE UTILIZING OFF-LINE STAND BUILDING EQUIPMENT Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths— Common Well Name: NK -08 Event Type: RE-ENTER- ONSHORE(RON) North America - ALASKA - BP Page 8 or 35 j Operation Summary Report Start Date: 3/22/2019 End Date: 4/16/2019 AFE No X3 -0199F -C: (8,452 503 00 ) Project: Niakuk Site: NK FIN WITH NEW PACK-OFFAND LAND ON Rig Name/No.: PARKER 272 Spud Daterrime: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Hrs Task Code NET Total Depth Phase Description of Operations (hr) REPRESENTATIVE (usft) - - 0330 - 0530 2.00 WHSUR P 9,879.40 DECOMP INSTALL NEW 9-5/8" PACK -OFF PER FMC 4000 PSI FOR 15 CHARTED MIN REPRESENTATIVE -GOOD TEST -MAKE UP NEW PACK -OFF TO RUNNING WSUP APPROVED TEST 06:30 - 0700 0.50 WHSUR P TOOLAND VIN THE HOLE DECOMP INSTALL 9" ID WEAR RING, RUN IN LOCK - PACK -OFF LANDED SEVERAL INCHES HIGH DOWN SCREWS AND LAY DOWN RUNNING _ - FMC REP VERIFIED PACK -OFF NOT SET TOOL _ 07:00 - 10:00 3.00 STWHIP P -REPEAT 2X WITH SAME RESULT WEXIT MAKE UPAND RUN IN THE HOLE WITH 9-5/8" '- SET DOWN ALLAVAILABLE WEIGHT WHIPSTOCK AND WINDOW MILLING SEVERAL TIMES - NO SUCCESS PULL PACK -OFF TO RIG FLOOR AND INSPECT - REPLACE INNER SEAL ON PACK -OFF - INSPECT CASING NECK FROM RIG FLOOR WITH FLASHLIGHT -MINOR AMOUNT OF FLUID ON BACKSIDE OF 9-5/8" CASING NECK: INDICATION OF SLIPS WITH W' PACKING - APPEARS TO BE HYDRO -LOCKED AND UNABLE TO GET PACK -OFF IN - RIG UP VAC LINE WITH T' LINE, RUN THROUGH IA VALVES AND SUCK OFF FLUID FROM BEHIND 9-5/8" CASING NECK Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths" FIN WITH NEW PACK-OFFAND LAND ON MARK - VERIFY PACK -OFF IN - RUN IN LOCK DOWN SCREWS PER FMC _ REPRESENTATIVE 05.30 - 06'.30 1.00 WHSUR P 9,879.40 DECOMP PRESSURE TEST 9-5/8" CASING PACK -OFF TO 4000 PSI FOR 15 CHARTED MIN -GOOD TEST WSUP APPROVED TEST 06:30 - 0700 0.50 WHSUR P 9,879.40 DECOMP INSTALL 9" ID WEAR RING, RUN IN LOCK DOWN SCREWS AND LAY DOWN RUNNING _ TOOL _ 07:00 - 10:00 3.00 STWHIP P 9,879.40 WEXIT MAKE UPAND RUN IN THE HOLE WITH 9-5/8" WHIPSTOCK AND WINDOW MILLING ASSEMBLY TO 953' MD - MAKE UP BAKER ONTRAK AND SCRIBE TO MILLING ASSEMBLY - MAKE UP WHIPSTOCK (VERIFIED SHIMS INSTALLED FOR LOW -SIDE EXIT) AND MILLING ASSEMBLY - SHALLOW HOLE TEST MWD AT 120' MD: GOOD - RUN IN THE HOLE AT 45 FPM PER SLB FISHING HAND - MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD DISPLACEMENT - MUD WEIGHT IN/OUT = 8.5 PPG WBS:WEXIT Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name: NK -08 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date: 3/22/2019 End Date. 4/16/2019 X3 -0199F -C: (8,452 503 00 ) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor. PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Him Task Code NPT _ __ _ (hr) 10:00 - 16:00 6.00 STWHIP P 16:00 - 20:00 4.00 STWHIP P 20.00 - 21.30 1.50 STWHIP P 21:30 - 0000 2.50 STWHIP P 3/27/2019 0000 - 0900 9.00 STWHIP P Page 9 of 35 Total Depth Phase Description of Operations (usft) 9,879.40 WEXIT RUN IN THE HOLE WITH 9-5/8" WHIPSTOCK ASSEMBLY PICKING UP 5" DRILL PIPE SINGLES FROM 953' MD TO 5181' MD - FILL PIPE EVERY 2000' MD - RUN IN THE HOLE AT 45 FPM PER SLB FISHING HAND - MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD DISPLACEMENT - MUD WEIGHT IN/OUT = 8.5 PPG HELD KICK WHILE TRIPPING DRILLAND AAR WITH YEAROUT'S CREW: 1.5 MIN WELL SECURE 9,879.40 WEXIT CONTINUE TO RUN IN THE HOLE WITH 9-5/8" WHIPSTOCK ASSEMBLY ON 5" DRILL PIPE STANDS OUT OF THE DERRICK FROM 5181' MD TO 9812' MD - FILL PIPE EVERY 2000'MD - RUN IN THE HOLE AT 45 FPM PER SLB FISHING HAND -MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD DISPLACEMENT - MUD WEIGHT IN/OUT = 8.5 PPG - PU 204 KLBS, SO 140 KLBS AT 9812' MD WASH DOWN AND ORIENT WHIPSTOCK 150° RIGHT OF HIGH -SIDE - FROM 9812'MD TO TOP OF STUMP AT 9936' MD - TAG TOP OF STUMP WITH 10 KI RS TO TRIP _ ANCHOR - PICK UP 24' AND SET WHIPSTOCK - SET DOWN ON WHIPSTOCKAND SHEAR OFF WITH 45 KLBS - TOP OF WHIPSTOCK SLIDE AT 9890' MO 9,879.40 WEXIT DISPLACE WELL FROM 8.5 PPG 3% KCL TO 9.5 PPG LSND - 550 GPM, 1200 PSI - MONITOR WELL FOR 10 MIN AFTER DISPLACEMENT: STATIC _ 9,879.40 WEXIT MILL 9-5/8" CASING WINDOW FROM 9859' MD TO 9862' MD (CORRECED DEPTHS) -450 GPM, 1300 PSI, 80-120 RPM, 11-19 KFT-LBS TORQUE, 4 KLBS WOB - PU 204 KLBS, SO 141 KLBS, ROT 162 KLBS AT 9890' MD - MUD WEIGHT IN/OUT = 9.5 PPG 9,925.00 WEXIT CONTINUE TO MILL 9-5/8" CASING WINDOW AND 21' OF NEW HOLE FROM 9862' MD TO 9893' MD (CORRECTED DEPTHS) -450 GPM, 1310 PSI, 820 RPM, 11-18 KFT-LBS TORQUE, 5-15 KLBS WOB - PU 204 KLBS, SO 141 KLBS, ROT 162 KLBS AT 9890' MD - MUD WEIGHT IN/OUT = 9.5 PPG - TOP OF WINDOW: 9890' MD (6136' TVD) - BOTTOM OF WINDOW: 9904' MD (6143' TVD) SIMOPS: - BUILD STANDS OF 5" DRILL PIPE UTILIZING Printed 5/9/2019 850 33AM **All depths reported in Drillers Depths"` North America - ALASKA - BP Page 10 of 35 Operation Summary Report Common Well Name: NK -OB AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/22/2019 End Date. 4/16/2019 X3 -0199F -C'. (8,452,503.00 ) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. FROM THE TOP OF THE WINDOW AT 9893' MD BPUOI: USA00001319 Active datum: ACTUAL KB P272 Q87.45usft (above Mean Sea Level) TO THE TOP OF THE BHAAT 948'MD Date From- To Hm Task Code NPT Total Depth Phase Description of Operations - MONITOR WELL FOR 10 MIN PRIOR TO (hr) _ (usfi) 0900 - 1030 1.50 STWHIP P 9,925.00 WEXIT RIG UPAND PERFORM LOT - MUD WEIGHT: 9.5 PPG - MUD WEIGHT: 9.5 PPG, 6121' TVD, 9859' MD - OBSERVE 1 JOINT DISCREPANCY IN THE DP - PUMP 6.5 BBLS TO 950 PSI, BLEED BACK 5 BBLS 1490 - 1800 3.50 STWHIP P '- LOT EMW = 12.4 PPG LAY DOWN MILLING ASSEMBLY FROM 948' MD -KICKTOLERANCE >25 BBL WITH EMW>1 Z2 TO SURFACE PPG - MONITOR WELL FOR 10 MIN AT THE TOP OF LOT APPROVED BY ODE 10'.30 - 1430 4.00 STWHIP P 9,925.00 WEXIT PULL OUT OF THE HOLE ON ELEVATORS Pnnted 5/9/2019 8:50:33AM "All depths reported in Drillers Depths— FROM THE TOP OF THE WINDOW AT 9893' MD TO THE TOP OF THE BHAAT 948'MD - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OUT OF THE HOLE (STATIC) - MUD WEIGHT: 9.5 PPG - OBSERVE 1 JOINT DISCREPANCY IN THE DP (1 JOINT SHORT) 1490 - 1800 3.50 STWHIP P ,i 9,925.00 WEXIT LAY DOWN MILLING ASSEMBLY FROM 948' MD TO SURFACE - MONITOR WELL FOR 10 MIN AT THE TOP OF THE BHA (STATIC) - RACK BACK HWDPAND LAY DOWN MILLING TOOLS - LEAD MILL 3/8" UNDER. FOLLOW MILL 1/4" UNDER, DRESS MILL 3/16" UNDER 18:00 - 19:00 1.00 STWHIP P 9,925.00 WEXIT CLEAN AND CLEAR RIG FLOOR -FLUSH STACK -OPEN MANUAL VALVES 19:00 - 22:00 3.00 STWHIP P 9,925.00 WEXIT MAKEUP THE 1.5" MOTOR BHA TO TOTAL LENGTH OF 1092' MD - HOLD PRESPUD MEETING WITH LYLE BUCKLER'S CREW WHILE SURFACE TESTING MWD 22.00 - 00:00 2.00 STWHIP P J 9,925.00 WEXIT RUN IN THE HOLE ON 5" DP FROM THE TOP OF THE BHAAT 1092' MD TO 3925' MD AT MIDNIGHT - BHA WEIGHT 83 KLBS - SHALLOW HOLE TEST THE MWD WITH 550 GPM, 1020 PSI (GOOD TEST) - STRAP IN THE HOLE DUE TO DP DISCREPANCY OBSERVED ON THE TRIP OUT 3/28/2019 00:00 03:30 3.50 STWHIP P 9,925.00 WEXIT RUN IN THE HOLE ON 5" DP FROM 3925' MD TO 9894' MD - STRAP IN THE HOLE DUE TO DP DISCREPANCY OBSERVED ON THE TRIP OUT - TOP OF THE WINDOW OBSERVED AT 9859' MD -ORIENT MOTOR 150' ROHS AND RUN TO BOTTOM AT 9894' MD Pnnted 5/9/2019 8:50:33AM "All depths reported in Drillers Depths— North America - ALASKA - BP Page 11 of 35 Operation Summary Report Common Well Name. NK -08 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/22/2019 End Date: 4/16/2019 X3 -0199F -C: (8,452.503.00) Project: Niakuk Site: NK _ 1.50 _ DRILL Rig Name/No.: PARKER 272 Spud DateRme: 7/14/1994 12:00:00AM Rig Release: 4/22/2019 Rig Contractor. PARKER DRILLING CO. 8PU01: USA00001319 Active datum: ACTUAL Ke P272 @67.45usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usR) _ 03:30 - 21:00 17.50 DRILL P 9,934.00 WEXIT DIRECTIONAL DRILL8-1/2" INTI HOLE FROM 9894' MO TO 9934' MD - LAY DOWN DIRECTIONAL TOOLS - 500-650 GPM, 1450-2200 PSI ON BOTTOM, 40-50 RPM, 12-18 KFT-LBS, 5-22 KLBS WOB - DISCUSS PLAN FORWARD WITH ODE 02:30 - MW IN/OUT = 9.5 PPG, NO LOSSES DRILLING 0.50 DRILL P AHEAD WEXIT CLEAN AND CLEAR RIG FLOOR 0300 - GASWATCH BACKGROUND RANGE =30 2.00 DRILL N UNITS, MAX =60 UNITS WEXIT WAIT ON FISHING TOOLS 0500 - NO BACKREAMING AT CONNECTIONS, 1.00 FISH N SURVEY EVERY 30' FOR DIRECTIONAL WEXIT MAKE UP REVERSE CIRCULATING BASKET MONITORING -SIMOPS: PICKUP 4" DRILLPIPE WITH ASSEMBLY ON 5" HWDP PER SLB FISHING OFFLINE EQUIPMENT - OBSERVE LOW ROP DUE TO ERRATIC TORQUE AND PUMP PRESSURES WITH THE MOTOR STALLING WHILE DRILLING. DISCUSS PLAN FORWARD WITH ODE AND WOS, DECISION MADE TO PULL OUT OF THE HOLE AND INSPECT THE BIT. 21:00 - 0000 3.00 DRILL P 9,934.00 WEXIT PULLOUT OF THE HOLE FROM BOTTOM AT 9934' MD TO 3400' MD AT MIDNIGHT -MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM (STATIC) - NO ISSUES PULLING THROUGH WINDOW - PU 200 KLBS, SO 145 KLBS AT 9934' MD -MW IN/OUT =9.5 PPG 3/29/2019 0000 - 01:00 1.00 DRILL P 9,934.00 WEXIT PULL OUT OF THE HOLE FROM 3400' MD TO THE TOP OF THE BHAAT 1092' MD - MW IN/OUT = 9.5 PPG - MONITOR WELL FOR 10 MIN AT THE TOP OF Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths" THE BHA (STATIC) 01:00 - 02:30 _ 1.50 _ DRILL P __ 9,934.00 WEXIT PULL OUT OF THE HOLE WITH THE BHA FROM 1092' MD TO SURFACE - INSPECT BIT, 2 MISSING CONES - LAY DOWN DIRECTIONAL TOOLS - DISCUSS PLAN FORWARD WITH ODE 02:30 - 03:00 0.50 DRILL P 9,934.00 WEXIT CLEAN AND CLEAR RIG FLOOR 0300 0500 2.00 DRILL N 9,934.00 WEXIT WAIT ON FISHING TOOLS 0500 - 0600 1.00 FISH N 9,934.00 WEXIT MAKE UP REVERSE CIRCULATING BASKET ASSEMBLY ON 5" HWDP PER SLB FISHING REP TO TOTAL LENGTH OF 931' MD 06:00 - 1000 4.00 FISH N 9,934.00 WEXIT RUN IN THE HOLE ON 5' DP FROM THE TOP OF THE BHAAT 931' MD TO 9840' MD 1000 - 11:30 1.50 FISH N 9,934.00 WEXIT OBTAIN BENCHMARK PARAMETERS AND ATTEMPT TO FISH LOST CONES AT 9934' MD - PU 192 KLBS, SO 135 KLBS, ROT 160 KLBS -30 RPM, 9K TORQUE - WASH AND REAM DOWN TO 9904' MD, OBSERVE OBSTRUCTION AT 9904' MD, SET DOWN UP TO 14 KLBS ON OBSTRUCTION, OBESERVE ERRATIC TORQUE UP TO 18 KFT-LBS, UNABLE TO PROCEED PAST 9904' MD _ 1130 - 15'.00 3.50 FISH N 9,934.00 WEXIT PULL OUT OF THE HOLE FROM 9904' MD TO THE TOP OF THE BHAAT 931' MD - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OUT OF THE HOLE (STATIC) - MUD WEIGHT IN/OUT = 9.5 PPG Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths" Common Well Name: NK -08 Event Type: RE-ENTER- ONSHORE(RON) North America - ALASKA - BP Operation Summary Report AFE No Start Date: 3/22/2019 End Dale: 4/16/2019 X3 -0199F-0 (8,452,503.00 ) Page 12 of 35 1 Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @87 45usft (above Mean Sea Level) Date From - To His Task Code NPT Total Depth Phase Description of Operations (hr) (usfi) 15:00 - 17:00 2.00 FISH N 9,934.00 WEXIT RACK BACK HWDPAND LAY DOWN RCJB FROM 931' MD TO SURFACE - MONITOR THE WELL FOR 10 MIN AT THE TOP OF THE BHA (STATIC) '-ALL TEETH ROUNDED OFF, 2 TEETH DAMAGED, NO RECOVERY IN RCJB 17:00 - 21'.00 4.00 STWHIP N 9,934.00 WEXIT MAKE UPAND RUN IN THE HOLE WITH 9-5/8" HYDRAULIC SET WHIPSTOCKAND WINDOW MILLING ASSEMBLY TO 773' MD - MAKE UP BAKER ONTRAKAND SCRIBE TO MILLING ASSEMBLY - MAKE UP WHIPSTOCK (VERIFIED SHIMS .INSTALLED FOR LOW -SIDE EXIT) AND MILLING ASSEMBLY - SHALLOW HOLE TEST MWD AT 100' MD (GOOD TEST) - RUN IN THE HOLE AT 63 FPM PER SLB FISHING HAND -MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD DISPLACEMENT -MUD WEIGHT IWOUT=9.5 PPG 21:00 - 0000 3.00 STWHIP IN 9,934.00 WEXIT— RUN IN THE HOLE WITH 9-5/8" WHIPSTOCK ASSEMBLY ON 5" DRILL PIPE STANDS OUT OF THE DERRICK FROM 773' MD TO 4100' MD - FILL PIPE ON THE FLYAND TOP OFF EVERY 5 STANDS - RUN IN THE HOLE AT 90 FPM PER SLB FISHING HAND - MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD DISPLACEMENT - MUD WEIGHT IN/OUT = 9.5 PPG 3/30/2019 00:00 - 04:30 4.50 STWHIP N 9,934.00 WEXIT CONTINUE TO RUN IN THE HOLE WITH 9-5/8" WHIPSTOCK ASSEMBLY ON 5" DRILL PIPE STANDS OUT OF THE DERRICK FROM 4100' MD TO 9801' MD - - FILL PIPE ON THE FLY AND TOP OFF EVERY 5 STANDS - RUN IN THE HOLE AT 90 FPM PER SLB FISHING HAND - MONITOR WELL WITH TRIP TANKAND HOLE FILL: GOOD DISPLACEMENT - MUD WEIGHT IN/OUT = 9.5 PPG - PU 185 KLBS, SO 134 KLBS 0430 - 05:00 0.50 STWHIP N 9,934.00 WEXIT WASH DOWN AND ORIENT WHIPSTOCK 150" RIGHT OF HIGH -SIDE - RUN 10' PAST SET DEPTH AND PICK UP TO SET DEPTH AT 9801' MD (BOTTOM OF ANCHOR) - FUNCTION BYPASS VALVE UNTIL CLOSED AND PRESSURE UP TO SET WHIPSTOCK ANCHOR - SET DOWN ON WHIPSTOCKAND SHEAR OFF WITH 50 KLBS - TOP OF WHIPSTOCK SLIDE AT 9778' MD Pnnted 5/9/2019 8:50:33AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 13 of 35 Common Well Name'. NK -08 - 1130 4.00 APE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/22/2019 End Date: 4/16/2019 X3 -0199F -C: (8,452,503.00 ) Project: Niakuk Site: NK 20:30 - 00:00 Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:00AM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. - MONITOR DISPLACEMENT ON TRIP TANKS: BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) 9,934.00 WEXIT MILL 9-5/8" CASING WINDOW FROM 9783' MD _ Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) I. .. _ _ (usft) - 450 GPM, 1225 PSI, 80-120 RPM, 16-18/11 05:00 - 07:30 2.50 ! STWHIP N 9,934.00 WEXIT MILL 9-5/8" CASING WINDOW FROM 9776' MD 07:30 - 1130 4.00 STWHIP N I. 11:30 - 13:30 200 STWHIP N i 1330 - 1400 0.50 STWHIP 14:00 TO 9783' MD - 500 GPM, PSI, 80-120 RPM, 11-18 KFT-LBS TORQUE, 5-15 KLBS WOB - PU 185 KLBS, SO 141 KLBS, ROT 162 KLBS - MUD WEIGHT IN/OUT = 9.5 PPG - OBSERVE -500 PSI PRESSURE LOSS WHILE MILLING, DECISION MADE TO PULL OUT OF THE HOLE TO TROUBLESHOOT PRESSURE LOSS 9,934.00 WEXIT PULL OUT OF THE HOLE FROM 978T MD TO THE TOP OF THE BHA AT 748' MD - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OUT OF THE HOLE (STATIC) - MONITOR DISPLACEMENT ON TRIP TANKS: GOOD DISPLACEMENT - MUD WEIGHT IN/OUT 9.5 PPG 9,934.00 WEXIT RACK BACK HWDPAND LAY DOWN UNNECESSARY BHA COMPONENTS FROM I 748' MD TO SURFACE - MONITOR WELL FOR 10 MIN AT THE TOP OF THE BHA (STATIC) - TEST BYPASS SUB, BYPASS SUB LEAKING, LAY DOWN BYPASS SUB AND MWD - MILLS GAGE = LEAD MILL 1/8 UNDER, FOLLOW MILL 1/16 UNDER, DRESS MILL IN GAGE N 9,934.00 WEXIT RUN IN THE HOLE WITH WINDOW MILLING ASSEMBLY TO TOTAL LENGTH OF 695'MD - MONITOR DISPLACEMENT ON TRIP TANKS. GOOD DISPLACEMENT 18:00 4.00 STWHIP N 9,934.00 WEXIT RUN IN THE HOLE ON 5" DP FROM 695' MD TO 7300' MD 18:00 - 19:00 1.00 STWHIP N 19:00 - 20:30 1.50 STWHIP N 20:30 - 00:00 3.50 STWHIP N 3/31/2019 00:00 - 02:00 2.00 STWHIP N Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths" - MONITOR DISPLACEMENT ON TRIP TANKS'. GOOD DISPLACEMENT 9,934.00 WEXIT CUTAND SLIP 9TOF DRILL LINE -CALIBRATE BLOCK HEIGHT INAMPHION AND BAKER SYSTEMS 9,934.00 WEXIT RUN IN THE HOLE ON 5" DP FROM 7300' MO TO THE WINDOW AT 9776' MO - MONITOR DISPLACEMENT ON TRIP TANKS: -GOOD DISPLACEMENT 9,934.00 WEXIT MILL 9-5/8" CASING WINDOW FROM 9783' MD _ TO 9790' MD. DRILL ADDITIONAL 12' TO GET THE UPPER DRESS MILL PAST THE BOTTOM OF THE WINDOW TO 9802' MD - 450 GPM, 1225 PSI, 80-120 RPM, 16-18/11 KFT-LBS TORQUE ON/OFF, 5 KLBS WOB - PU 198 KLBS, SO 132 KLBS, ROT 158 KLBS - MUD WEIGHT IN/OUT = 9.6 PPG - REAM OUT WINDOW WITH MILLING ASSEMBLY, DRY DRIFT WINDOW WITH MILLING ASSEMBLY WITH NO ISSUES - TOP OF WINDOW: 9776' MO (6084' TVD) - BOTTOM OF WINDOW: 9790' MD (6090' TVD) 9,934.00 WEXIT COMPLETE WINDOW MILLING - SEE PREVIOUS TIME ENTRY FOR DETAILS Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 14 of 35 Operation Summary Report Common Well Name: NK -08 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 3/22/2019 End Date. 4/16/2019 X3 -0199F -C: (8,452,50300) Project: Niakuk Site NK Rig Name/No.: PARKER 272 Spud Daterrime: 7/14/1994 12:OO:OOAM Rig Release: 4/22/2019 Rig Contractor. PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Hm Task Code NPT Total Depth Phase Description of Operations (hr) (usft) ___ - 02.00 - 0530 3.50 STWHIP N 9,934.00 WEXIT PULL OUT OF THE HOLE FROM 8802' MD TO 0530 - 06.00 0.50 STWHIP N 06'.00 - 07'.30 1.50 STWHIP N 07:30 - 09:00 1.50 DRILL N 09:00 - 1600 DRILL N 7.00 16:00 - 16.30 0.50 DRILL N 16:30 - 17:30 1.00 DRILL N 9,934.00 WEXIT RIG UP AND PERFORM LOT - MUD WEIGHT: 9.6 PPG, 6084' TVD, 9776' MD - PUMP 5.2 BBLS TO 1020 PSI, BLEED BACK 5.2 BBLS - LOT EM W = 12.8 PPG - KICK TOLERANCE >25 BBL WITH EMW >12.2 PPG - LOT APPROVED BY ODE Printed 5/8/2019 8:50:33AM **All depths reported in Drillers Depths** THE TOP OF THE BHAAT 695' MD - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OUT OF THE HOLE (STATIC) - MONITOR DISPLACEMENT ON TRIP TANKS: _GOOD DISPLACEMENT_ 9,934.00 WEXIT RACK BACK HWDPAND LAY DOWN MILLING ASSEMBLY FROM 695' MD TO SURFACE - MONITOR DISPLACEMENT ON TRIP TANKS: GOOD DISPLACEMENT - MILL'S GAGE: LEAD MILL 1/4" OUT, FOLLOW MILL 1/16" OUT, DRESS MILL IN GAGE 9,934.00 WEXIT CLEAN AND CLEAR RIG FLOOR -FLUSH STACK _ _ _'-PE_R_FORM WEEKLY BOPEFUNCTION TEST 9,934.00 WEXIT MAKE UP THE 1.7* MOTOR BHA TO TOTAL LENGTH OF 1093' MD - SHALLOW HOLE TEST THE MWD WITH 600 GPM, 650 PSI (GOOD TEST) y _ - PU 53 KLBS, SO 53 KLBS 9,934.00 WEXIT RUN IN THE HOLE ON 5" DP FROM THE TOP OF THE BHAAT 1093' MO TO BOTTOM AT 9802' MD - ORIENT MOTOR TO 150° ROHS PRIOR TO ENTERING WINDOW - NO ISSUES TRIPPING THROUGH WINDOW - HOLD D1 KICK WHILE TRIPPING DRILLAND AAR _ 9,934.00 WEXIT DIRECTIONAL DRILL 8-1/2" INTI HOLE FROM 9802' MD TO 9816' MD - 500 GPM, 1550 PSI ON BOTTOM, 14 KLBS WOB - MW IN/OUT= 9.6 PPG, NO LOSSES DRILLING AHEAD N 9,934.00 WEXIT RIG UP AND PERFORM LOT - MUD WEIGHT: 9.6 PPG, 6084' TVD, 9776' MD - PUMP 5.2 BBLS TO 1020 PSI, BLEED BACK 5.2 BBLS - LOT EM W = 12.8 PPG - KICK TOLERANCE >25 BBL WITH EMW >12.2 PPG - LOT APPROVED BY ODE Printed 5/8/2019 8:50:33AM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Common Well Name: NK -08 Event Type: RE-ENTER- ONSHORE (RON) Start Date. 3/22/2019 Project. Niakuk Site: NK AFE No End Date: 4/16/2019 X3 -0199F -C'. (8,452,503.00 ) Page 15 of 35 Rig Name/No.: PARKER 272 Spud Daterrime: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) ._ -- _ _ 17:30 - 00:00 8.50 DRILL P 10,050.00 INTI DIRECTIONAL GRILL B-1/2"INTI HOLE THROUGH FROM 9816' MD TO 10050' MD, (234' IN 6.5 HRS = 36 FPH WITH CONNECTIONS). - 500 GPM, 1700/1600 PSI ON/OFF BOTTOM, 40 RPM, 14/12 KFT-LBS TRQ ON/OFF BTM, UP TO 18 KLBS WOB - MW IN/OUT = 9.6 PPG, NO LOSSES DRILLING AHEAD - ECD CLEANHOLE = 10.19 PPG, ACTUAL = 10.46 PPG, HARDLINE = 10.99 PPG (.8 OVER CALCULATED CLEANHOLE OR 12 PPG) - GASWATCH BACKGROUND RANGE =80 UNITS, MAX = 174 UNITS - NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 30' FOR DIRECTIONAL MONITORING j - FIRST CLEAN MWD SURVEY AT 9950'MD WBS:INT1 _ 4/1/2019 00:00 - 0830 6.50 DRILL P 10,193.00 1 INT1 DIRECTIONAL DRILL 8-1/2" INTI HOLE THROUGH FROM 10050' MD TO 10193' MD, (142' IN 6 HRS = 24 FPH WITH CONNECTIONS). - 500 GPM, 1650/1550 PSI ON/OFF BOTTOM, 40 RPM, 14/12 KFT-LBS TRQ ON/OFF BTM, UP TO 16 KLBS WOB - MW IN/OUT = 9.6 PPG, NO LOSSES DRILLING AHEAD - ECD CLEANHOLE = 10.19 PPG, ACTUAL= 10.46 PPG, HARDLINE = 10.99 PPG (.8 OVER CALCULATED CLEANHOLE OR 12 PPG) - GASWATCH BACKGROUND RANGE =44 UNITS, MAX= 109 UNITS - NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 30' FOR DIRECTIONAL MONITORING - OBJECTIVES MET FOR THIS RUN AT 10193' MD, CONFIRM SEPARATION FROM NK -08A WELLBORE AND OBTAIN 5 CLEAN SURVEYS 0630 - 0890 2.00 DRILL P 10,193.00 INTI BACKREAM OUT OF THE HOLE FROM 10193' MD TO THE TOP OF THE DIRECTIONAL TOOLS AT THE BOTTOM OF THE WINDOW AT 9871' MD - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM (STATIC) - PULLAT 300 FPH - 650 GPM, 2300 PSI, 40 RPM, 12-14 KFT-LBS TORQUE 08:30 - 09:30 1.00 DRILL P 10,193.00 INT1 PULL TO THE TOP OF THE WINDOWAT 9776' MD, CIRCULATE BOTTOMS UP - 650 GPM, 2300 PSI, NO ROTATION, RECIPROCATE STAND - I PASS FROM 9678' MD TO 9772' MO - DECISION MADE TO RUN TO BOTTOM AND DRILL AHEAD TO OBTAIN 5 CONSECUTIVE CLEAN SURVEYS 09:30 - 10:30 1.00 DRILL N 10,193.00 INTI RUN IN THE HOLE ON ELEVATORS TO BOTTOM AT 10193' MD - NO ISSUES RUNNING THROUGH THE Printed 5/9/2019 8:50P33AM "All depths reported in Drillers Depths" Common Well Name. NK -08 Event Type: RE-ENTER- ONSHORE (RON) Project: Niakuk North America - ALASKA - BP Operation Summary Report Start Date: 3/22/2019 End Date. 4/16/2019 Site: NK Rig Contractor. PARKER DRILLING CO. Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Page 16 of 35 AFE No X3 -0199F -C: (8,452,503.00 ) Rig Release: 4/22/2019 BPUOI: USA00001319 Date From - To Hm Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 1030 - 1530 5.00 DRILL P 10,350.00 INT1 DIRECTIONAL DRILL 8-1/2" INTI HOLE 1530 - 16:00 0.50 DRILL N 1600 - 1730 1.50 DRILL N 1730 - 2030 3.00 DRILL P 20:30 - 22:30 2.00 DRILL P 2230 - 2300 0.50 DRILL P 2300 - 0000 1.00 DRILL P 4/2/2019 00:00 - 0200 2.00 DRILL P Printed 5/92019 8:50:33AM **All depths reported in Drillers Depths" THROUGH FROM 10193' MD TO 10350' MD, (157' IN 5 HRS = 31 FPH WITH CONNECTIONS). '- 500 GPM, 1650/1550 PSI ON/OFF BOTTOM, 40 RPM, 14/12 KFT-LBS TRQ ON/OFF BTM, UP TO 18 KLBS WOB - MW IN/OUT = 9.8 PPG, NO LOSSES DRILLING AHEAD - ECD CLEANHOLE = 10.19 PPG, ACTUAL = 10.46 PPG, HARDLINE = 10.99 PPG (a OVER CALCULATED CLEANHOLE OR 12 PPG) - GASWATCH BACKGROUND RANGE =50 UNITS, MAX= 100 UNITS '- NO RACKREAMING AT CONNECTIONS, SURVEY EVERY 30' FOR DIRECTIONAL I MONITORING '- OBJECTIVES MET FOR THIS RUN AT 10350' MD, OBTAIN 5 CONSECUTIVE CLEAN SURVEYS_ _ 10,350.00', INTI PULL OUT OF THE HOLE ON ELEVATORS 'FROM BOTTOM AT 10350' MD TO THE TOP OF THE WINDOWAT 9776'MD - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM (STATIC) 10,350.00 INTI CIRCULATE BOTTOMS UP _ -650 GPM, 240_0 PSI, RECIPROCATE STAND 10,350.00 INTI PULL OUT OF THE HOLE FROM 9776' MD TO THE TOP OF THE BHAAT 1093' MD - MONITOR THE WELL FOR 10 MIN AT THE _ TOP OF THE BHA (STATIC)__ 10,350.00 INTI RACK BACK HWDPAND LAY DOWN MOTOR ASSEMBLY FROM 1093' MD TO SURFACE - BIT GRADE: 2-1-1/16" OUT OF GAGE 10,350.00 INT1 CLEAN AND CLEAR RIG FLOOR 10,350.00 INTI MAKEUP8-1/2"X9-1/4"RSS/ANDERREAMER DRILLING ASSEMBLY TO 54' MD - FLOWCHECK WELL FOR 10 MIN PRIOR TO RUNNING IN HOLE (STATIC) - AUTO TRAK NEW NOV SK61 SM -J1 D PDC BIT, ONTRAK (GR/RES/PWDIVSS/SURVEY) 10,350.00 INT1 MAKEUP 8-1/2" X 9-1/4" RSS / ANDERREAMER DRILLING ASSEMBLY TO TOTAL LENGTH OF 954' MD - FLOWCHECK WELL FOR 10 MIN PRIOR TO RUNNING IN HOLE (STATIC) -AUTO TRAK, NEW NOV SK616M-JID PDC BIT, ONTRAK (GR/RES/PWDIVSS/SURVEY) -ANDERREAMER CUTTERS 138'BACK FROM BIT - PLUG IN AND VERIFY MWD Printed 5/92019 8:50:33AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name: NK -08 Event Type: RE-ENTER- ONSHORE (RON) Protect: Niakuk Start Date: 3/22/2019 Site: NK AFE No End Date. 4/16/2019 X3 -0199F -C. (8,452,503.00 ) Rig Release: 4/22/2019 Page 17 of 35 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To His Task Code NPT Total Depth Phase Description of Operations (hr) (usft)_ 02:00 - 10:30 8.50 DRILL P 10,350.00 INT1 TRIP IN THE HOLE WITH THE 8-1/2" X 9-1/4" RES / ANDERREAMER DRILLING ASSEMBLY ON 4" AND 5" DRILLPIPE FROM 954' MD TO PREVIOUSLY DRILLED DEPTH OF 10350' MD - SHALLOW HOLE TEST THE MWD AT 954' MD WITH 625 GPM, 1400 PSI (GOOD TEST) - NO ISSUES WITH UNDERREAMER THROUGH WINDOW OR OPENHOLE - OBTAIN ECD BENCHMARKS -TAKE THREE VERIFICATION SURVEYS WITH NEW MWD - DROP 1-3/8" ACTIVATION BALL FOR ANDERREAMER AT 10192' MD, PERFORM PULL TEST ON ANDERREMER, OBSERVE 8K OVERPULL AT THE TOP OF THE ,UNDERREAMED HOLE HOLD UNANNOUNCED D1 KICK WHILE TRIPPING DRILL 1030 - 1800 7.50 DRILL P 11,025.00 INTI DIRECTIONAL DRILL B-1/2"X9-1/4"INTI HOLE FROM 10350' MD TO 11025' MD (675' IN 7.5 HRS = 90 FPH WITH CONNECTIONS) INSTANTANEOUS ROP: UP TO 200 FPH 750 GPM, 4000 PSI ON/OFF BOTTOM, 150 RPM, 18/14 KFT-LBS TRO ON/OFF BTM, UP TO 20 KLBS WOB - MW IN/OUT = 9.6 PPG, NO LOSSES DRILLING AHEAD - ECD CLEANHOLE = 10.35 PPG, ACTUAL = 10.85 PPG, HARDLINE = 11.15 PPG (A OVER CALCULATED CLEANHOLE OR 12 PPG) - GASWATCH BACKGROUND RANGE =70 UNITS, MAX = 125 UNITS NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 90' FOR DIRECTIONAL MONITORING - PUMP 35 BBL WEIGHTED SWEEPAT 10885' MD, 25% INCREASE IN CUTTINGS BACKAT SHAKERS - SIMOPS: MAKE UP STANDS OF 4" DRILLPIPE WITH OFFLINE EQUIPMENT Printed 5/9/2019 8.50.33AM **All depths reported in Drillers Depths"` North America - ALASKA - BP Operation Summary Report Page 18 of 35 Common Well Name: NK -08 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date: 3/22/2019 End Date. 4/16/2019 X3 -0199F -C: (8,452,503.00 ) Project: Niakuk - Site: NK Rig Name/No.: PARKER 272 Spud Daternme: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) .. 18:00 - 00:00 6.00 DRILL P 11,025.00 INTI DIRECTIONAL DRILL B-1/2"X9-1/4"INTI HOLE FROM 11025' MD TO 11601' MD (576' IN 6 HRS =96 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP: UP TO 200 FPH - 750 GPM, 4100 PSI ON/OFF BOTTOM, 150 RPM, 18/11 KFT-LBS TRQ ON/OFF BTM, UP TO 20 KLBS WOE - MW IN/OUT = 9.6 PPG, NO LOSSES DRILLING AHEAD -ECD CLEANHOLE= 10.35 PPG, ACTUAL= 10.85 PPG, HARDLINE = 11.15 PPG (.8 OVER CALCULATED CLEANHOLE OR 12 PPG) - GASWATCH BACKGROUND RANGE =100 UNITS, MAX = 200 UNITS - NO BACKREAMING AT CONNECTIONS, j SURVEY EVERY 90' FOR DIRECTIONAL MONITORING - PUMP 35 BBL WEIGHTED SWEEP AT 11355' MD, 10% INCREASE IN CUTTINGS BACKAT 'SHAKERS - OBSERVE FEW SPOTS THAT STALLED . OUT THE DRILL STRING AT 22 KFT-LBS, 2 PULLED FREE WITH MINIMALOVERPULL j AFTER RELEASING THE TORQUE, THE LAST SPOTAT 11404' MD TOOK 50 KFT-LBS OVERPULL TO PULL FREE AFTER RELEASING TORQUE, NO ISSUES WITH TORQUEAFTER 11404' MD. - SIMOPS: MAKE UP STANDS OF 4" DRILLPIPE WITH OFFLINE EQUIPMENT Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths" Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths— North America - ALASKA - BP Page 19 of 35 Operation Summary Report Common Well Name: NK -08 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date. 3/22/2019 End Date: 4/16/2019 X3 -0199F -C'. (8,452.503.00) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usR) 4/3/2019 00:00 - 06:00 6.00 DRILL P 12,193.00 INTI DIRECTIONAL DRILL 8-1/2" X 9-1/4" INT1 HOLE FROM 11601' MD TO 12193' MD (592' IN 6 HRS = 99 FPH WITH CONNECTIONS) - INSTANTANEOUS ROP: UP TO 200 FPH - 700 GPM, 4000 PSI ON/OFF BOTTOM, 150 RPM, 14/11 KFT-LBS TRQ ON/OFF BTM, UP TO 20 KLBS WOB -- PU 213 KLBS, SO 143 KLBS, ROT 164 KLBS - MW IN/OUT = 10.4 PPG, NO LOSSES DRILLINGAHEAD -ECD CLEANHOLE= 10.87 PPG, ACTUAL= .11.6 PPG, HARDLINE = 12 PPG (.8 OVER CALCULATED CLEANHOLE OR 12 PPG) - GASWATCH BACKGROUND RANGE= 43 UNITS, MAX = 50 UNITS - NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 90' FOR DIRECTIONAL 'MONITORING - PUMP 35 BBL WEIGHTED SWEEP AT 11800' MD, 50% INCREASE IN CUTTINGS BACKAT SHAKERS - MUD PUMP PRESSURE RELIEF VALVE 'ACTIVATING AT -4350 PSI, REDUCE PUMP RATE TO REDUCE PUMP PRESSURE - BEGIN TO WEIGHT UP THE MUD SYSTEM TO 10.4 PPG OVER 4 CIRCULATIONS WITH SPIKE FLUID AT 11800'MD, TO BEAT 10.4 PPG PRIOR TO THE CM3 AT 12429' MD. - SIMOPS: MAKE UP STANDS OF 4" DRILLPIPE WITH OFFLINE EQUIPMENT Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths— North America - ALASKA- BP Operation Summary Report Page 20 of 35 Common Well Name: NK -08 AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date: 3/22/2019 End Date: 4/16/2019 X3 -0199F -C. (8,452,503.00 ) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor. PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (ui 06:00 - 12:00 5.00 DRILL P 12,742.00 INTI DIRECTIONAL DRILL 8-1/2"X9-1/4"INTI HOLE FROM 12193' MD TO 12742' MD (549' IN 6 HRS = 92 FPH WITH CONNECTIONS) - INSTANTANEOUS ROP: UP TO 170 FPH, REDUCED ROP AT THE TOP OF THE CM3 PER WELL PROGRAM FOR HOLE CLEANING - 650 GPM, 3800 PSI ON/OFF BOTTOM, 150 RPM, 14/11 KFT-LBS TRQ ON/OFF BTM, UP TO 20 KLBS WOB, REDUCE PUMP RATE AT THE TOP OF THE CM3 PER WELL PROGRAM - PU 218 KLBS, SO 147 KLBS, ROT 166 KLBS - MW IN/OUT = 10.4 PPG, NO LOSSES DRILLING AHEAD - ECD CLEANHOLE = 11.23 PPG, ACTUAL= 11.6-11.8 PPG, HARDLINE = 12 PPG (.8 OVER CALCULATED CLEANHOLE OR 12 PPG) - GASWATCH BACKGROUND RANGE = 43 UNITS, MAX = 117 UNITS - NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 90' FOR DIRECTIONAL MONITORING - TOP OF CM3 @ 12470' MD - PUMP 35 BBL WEIGHTED SWEEP AT 12401' MD, 10% INCREASE IN CUTTINGS BACKAT SHAKERS - SIMOPS: MAKE UP STANDS OF 4" DRILLPIPE WITH OFFLINE EQUIPMENT _ 1200. - 1800 6.00 DRILL P 12,742.00 INT1 DIRECTIONAL DRILL 8.1/2"X9-1/4"INTI HOLE FROM 12742' MD TO 13152' MD (410' IN 6 HRS = 68 FPH WITH CONNECTIONS) - INSTANTANEOUS ROP: UP TO 170 FPH, HOLD BACK ON ROP AT 100-125 FPH WHEN NEEDED FOR DIRECTIONAL CONTROL - 650 GPM, 4100 PSI ON/OFF BOTTOM, 150 RPM, 14/11 KFT-LBS TRQ ON/OFF BTM, UP TO 20 KLBS WOB - PU 225 KLBS, SO 156 KLBS, ROT 170 KLBS - MW IN/OUT = 10.4 PPG, NO LOSSES DRILLING AHEAD - ECD CLEANHOLE =11.12 PPG, ACTUAL= 11.6-11.8 PPG, HARDLINE = 12 PPG (.8 OVER CALCULATED CLEANHOLE OR 12 PPG) - GASWATCH BACKGROUND RANGE =70 UNITS, MAX = 183 UNITS - NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 90' FOR DIRECTIONAL MONITORING - PUMP 35 BBL WEIGHTED SWEEPAT 12785' MD, NO INCREASE IN CUTTINGS BACKAT SHAKERS - SIMOPS: MAKE UP STANDS OF 4" DRILLPIPE WITH OFFLINE EQUIPMENT Printed 5/9/2019 8:50:33AM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 21 of 35 Common Well Name: NK -08 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/22/2019 End Date: 4/16/2019 X3 -0199F -C. (8,452,503 00 ) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00 OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. SPUO1: USA00001319 Active datum: ACTUAL KB P272 @67.45us8 (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft)__- 18:00 - 0000 6.00 DRILL P 13,506.00 INTI DIRECTIONAL DRILL B-1/2"X9-1/4"INTI HOLE FROM 13152' MD TO 13508' MD (356' IN 6 HRS = 59 FPH WITH CONNECTIONS) - INSTANTANEOUS ROP: UP TO 170 FPH, HOLD BACK ON ROPAT 100-125 FPH WHEN NEEDED FOR DIRECTIONAL CONTROL - 650 GPM, 4100 PSI ON/OFF BOTTOM, 150 RPM, 14/11 KFT-LBS TRO ON/OFF BTM, UP TO 20 KLBS WOB - PU 229 KLBS, SO 159 KLBS, ROT 175 KLBS - MW IN/OUT = 10.5 PPG, NO LOSSES DRILLING AHEAD - ECD CLEANHOLE = 11.22 PPG, ACTUAL = 11.7-11.9 PPG, HARDLINE = 12 PPG (.8 OVER CALCULATED CLEANHOLE OR 12 PPG) - GASWATCH BACKGROUND RANGE =39 UNITS, MAX = 182 UNITS - NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 90' FOR DIRECTIONAL MONITORING 4/4/2019 00'.00 - 04:30 4.50 DRILL P 0430 - 1200 7.50 DRILL N - PUMP 35 BBL WEIGHTED SWEEP AT 13170' MD, 50% INCREASE IN CUTTINGS BACKAT SHAKERS 13,813.00 INT1 DIRECTIONAL DRILL 8-1/T' X 9-1/4" INT1 HOLE FROM 13,508' MD TO 13,813' MD (305' IN 4.5 HRS = 68 FPH WITH CONNECTIONS) - INSTANTANEOUS ROP: UP TO 170 FPH, HOLD BACK ON ROP AT 100-125 FPH WHEN NEEDED FOR DIRECTIONAL CONTROL -650 GPM, 4100 PSI ON/OFF BOTTOM, 150 RPM, 14/11 KFT-LBS TRQ ON/OFF BTM, UP TO 20 KLBS WOB - PU 229 KLBS, SO 159 KLBS, ROT 175 KLBS - MW IN/OUT = 10.5 PPG, NO LOSSES DRILLING AHEAD -ECD CLEANHOLE= 11.22 PPG, ACTUAL= 11.7-11.9 PPG, HARDLINE = 12 PPG (.8 OVER CALCULATED CLEANHOLE OR 12 PPG) - GASWATCH BACKGROUND RANGE =39 UNITS, MAX = 182 UNITS - NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 90' FOR DIRECTIONAL MONITORING - SOFT SPEED ENABLED - OBSERVE DROP IN PUMP PRESSURE, DISCHARGE FLANGE LEAKING BETWEEN PUMP MODULEAND PULSATION DAMPENER 13,813.00 INTI CIRCULATE HOLE CLEAN WHILE REPAIRING THE MUD PUMP - 400 GPM, 1900 PSI, 60 RPM, 12 KFT-LBS TORQUE - RECIPROCATE FULL STAND WHILE CIRCULATING - PRESURE TEST MUD PUMP AND STANDPIPE TO 4200 PSI (NO LEAKS) - ATTEMPT TO RETURN TO DRILLING AND DISCOVER HIGH PRESSURE HOSE ON MUD PUMP LEAKING Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths" North America -ALASKA - BP Operation Summary Report Page 22 of 35 Common Well Name: NK -08 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/22/2019 End Date: 4116/2019 X3 -01991`-C: (8,452,503.00 ) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud DateRme: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOE USA0000131g Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To His Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12:00 - 14.00 2.00 DRILL N 13,813.00 INTI CIRCULATE HOLE CLEAN WHILE REPAIRING 14:00 - 18:00 4.00 18.00 - 00.00 6.00 DRILL P DRILL THE MUD PUMP - 400 GPM, 1900 PSI, 60 RPM, 12 KFT-LBS TORQUE - RECIPROCATE FULL STAND WHILE CIRCULATING - PRESURE TEST MUD PUMPAND STANDPIPE TO 4200 PSI (NO LEAKS) _ 14,011.00 INTI DIRECTIONAL DRILL 8-1/2" X 9-1/4" INTI HOLE FROM 13,813' MD TO 14,011' MD (198' IN 4 HRS = 50 FPH WITH CONNECTIONS) - INSTANTANEOUS ROP: UP TO 170 FPH, HOLD BACK ON ROP WHEN NEEDED FOR DIRECTIONAL CONTROL -650 GPM, 4200 PSI ON/OFF BOTTOM, 150 RPM, 16/12 KFT-LBS TRQ ON/OFF BTM, UP TO 16 KLBS WOB - PU 250 KLBS, SO 170 KLBS, ROT 187 KLBS - MW IN/OUT = 10.5 PPG, NO LOSSES DRILLINGAHEAD CLEANHOLE= 11.21 PPG, ACTUAL= 11.7-11.9 PPG, HARDLINE = 12 PPG GASWATCH BACKGROUND RANGE =200 UNITS, MAX = 350 UNITS NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 90' FOR DIRECTIONAL MONITORING _ - SOFT SPEED ENABLED _ P 4,360.00 INTI DIRECTIONAL DRILL 8-1/2"X9-1/4"INTI HOLE FROM 14,011' MD TO 14,360' MD (349' IN 6 HRS = 58 FPH WITH CONNECTIONS) - INSTANTANEOUS ROP: UP TO 150 FPH, HOLD BACK ON ROP WHEN NEEDED FOR DIRECTIONAL CONTROL - 640 GPM, 4375 PSI ON/OFF BOTTOM, 150 RPM, 17/13 KFT-LBS TRQ ON/OFF BTM, UP TO 16 KLBS WOB - PU 262 KLBS, SO 172 KLBS, ROT 191 KLBS - MW IN/OUT = 10.7 PPG, NO LOSSES DRILLING AHEAD - ECD CLEANHOLE = 11.4 PPG, ACTUAL = 11.7-12.7 PPG, HARDLINE = 12.2 PPG GASWATCH BACKGROUND RANGE =150 UNITS, MAX = 350 UNITS - NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 90' FOR DIRECTIONAL MONITORING - SOFT SPEED ENABLED - PUMP 35 BBL WEIGHTED SWEEPAT 14,095' MD, 25% INCREASE IN CUTTINGS BACKAT SHAKERS - BEGIN TO WEIGHT UP THE MUD SYSTEM TO 10.7 PPG OVER 2 CIRCULATIONS WITH BARITE AT 14150' MD, TO BE AT 10.7 PPG PRIOR TO THE CM1 AT 14,440' MD. - RECEIVE APPROVAL FROM ODE TO RAISE ECD HARDLINE TO 12.2 PPG Printed 5/9/2019 8.50.33AM ••AII depths reported in Drillers Depths** North America - ALASKA - BP Page 23 of 35 Operation Summary Report Common Well Name: NK -08 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 3/22/2019 End Date' 4/16/2019 X3 -0199F -C: (8,452,503.00 ) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date(Time: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor. PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (usft) _ _(hr) _ 4/5/2019 0000 - 06:00 6.00 DRILL P 14,526.00 INTI DIRECTIONALDRILL8-1/2'X9-1/4"INTIHOLE FROM 14,360' MD TO 14,528' MD (166' IN 6 HRS = 28 FPH WITH CONNECTIONS) - INSTANTANEOUS ROP: UP TO 120 FPH, HOLD BACK ON ROP WHEN NEEDED FOR DIRECTIONAL CONTROL - 630 GPM, 4350 PSI ON/OFF BOTTOM, 150 RPM, 20/16 KFT-LBS TRO ON/OFF BTM, UP TO 16 KLBS WOB - PU 272 KLBS, SO 168 KLBS, ROT 193 KLBS - MW IN/OUT = 10.7 PPG, NO LOSSES DRILLING AHEAD -ECD CLEANHOLE = 11.4 PPG, ACTUAL= 11.7-12.1 PPG, HARDLINE = 12.2 PPG '- GASWATCH BACKGROUND RANGE =52 UNITS, MAX = 52 UNITS - NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 90' FOR DIRECTIONAL MONITORING SOFT SPEED ENABLED_ _ 0600 - 1200 6.00 DRILL P 14,854.00 INTI DIRECTIONAL DRILL 3-1/2"X9-1/4"INTI HOLE FROM 14,526' MD TO 14,833' MD (307' IN 6 HRS =51 FPH WITH CONNECTIONS) - INSTANTANEOUS ROP: UP TO 120 FPH, HOLD BACK ON ROP WHEN NEEDED FOR DIRECTIONAL CONTROL .620 GPM, 4250 PSI ON/OFF BOTTOM, 150 RPM, 26/23 KFT-LBS TRO ON/OFF BTM, UP TO 18 KLBS WOB - PU 299 KLBS, SO 164 KLBS, ROT 198 KLBS - MW IN/OUT = 10.7 PPG, NO LOSSES DRILLING AHEAD -ECD CLEANHOLE= 11.4 PPG, ACTUAL= 11.7-12.1 PPG, HARDLINE = 12.2 PPG - GASWATCH BACKGROUND RANGE =50 UNITS, MAX = 470 UNITS - NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 90' FOR DIRECTIONAL MONITORING - SOFT SPEED ENABLED 12:00 - 18:00 6.00 DRILL P 15,203.00 INTI DIRECTIONAL DRILL 8-1/2"X9-1/4"INTI HOLE FROM 14,833' MD TO 15,203' MD (370' IN 6 HRS =62 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP: UP TO 120 FPH - 620 GPM, 4350 PSI ON/OFF BOTTOM, 150 RPM, 26/23 KFT-LBS TRO ON/OFF BTM, UP TO 18 KLBS WOB - PU 305 KLBS, SO 174 KLBS, ROT 202 KLBS - MW IN/OUT = 10.7 PPG, NO LOSSES DRILLING AHEAD - ECD CLEANHOLE =11.4 PPG, ACTUAL= 11.7-12.1 PPG, HARDLINE= 12.2 PPG - GASWATCH BACKGROUND RANGE =140 UNITS, MAX = 230 UNITS - NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 90' FOR DIRECTIONAL MONITORING -SOFT SPEED ENABLED - OBSERVE ERRATIC TORQUE WHILE DRILLING TUFFS IN THE CM2 AND CMI Printed 5/92019 8:5o:33AM "All depths reported in Drillers Depths" Common Well Name: NK -08 Event Type: RE -ENTER -ONSHORE (RON) Project: Niakuk North America - ALASKA- BP Operation Summary Report Start Date: 3/222019 End Date: 4/16/2019 Site: NK Active datum: ACTUAL KB P272 @67.45usR (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase (hr) (usft) 18:00 - 00:00 6.00 DRILL P 15,550.00 INT1 4/6/2019 00'.00 - 0900 9.00 DRILL P 15,937.00 INTI 0900 - 1030 1.50 DRILL P 15,937.00 INTI 1030 - 1100 0.50 DRILL P 15,937.00 INTI Printed 5/9/2019 8.50.33AM **All depths reported in Drillers Depths" Page 24 of 35 AFE No K3 -0199F -C:(8,452,503.00) BPUOI: USA00001319 Description of Operations DIRECTIONAL DRILL 8-1/2" X 9-1/4" INTI HOLE FROM 15,203' MD TO 15,550' MD (347' IN 6 HRS = 58 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP: UP TO 120 FPH ' 620 GPM, 4375 PSI ON/OFF BOTTOM, 150 RPM, 26/23 KFT-LBS TRQ ON/OFF BTM, UP TO 16 KLBS WOB '- PU 310 KLBS, SO 178 KLBS, ROT 204 KLBS - MW IN/OUT =10.7 PPG, NO LOSSES DRILLING AHEAD - ECD CLEANHOLE = 11.4 PPG, ACTUAL= 11.7-11.9 PPG, HARDLINE =12.2 PPG - GASWATCH BACKGROUND RANGE =100 UNITS, MAX = 510 UNITS ' - NO BACKREAMING AT CONNECTIONS, SURVEY EVERY90' FOR DIRECTIONAL MONITORING SOFT SPEED ENABLED - OBSERVE TEMPORARY 3% LELALARM IN THE SHAKER ROOM, WSL NOTIFIED_ WSUP DIRECTIONAL DRILL 8-1/2" X 9-1/4" INTI HOLE FROM 15,550 MD TO SECTION TD AT 15.937' MD, 9882' TVD (387' IN 9 HRS = 43 FPH WITH CONNECTIONS) - INSTANTANEOUS ROP: UP TO 120 FPH - 600 GPM, 4342 PSI ON/OFF BOTTOM, 120 RPM, 30/28 KFT-LBS TRQ ON/OFF BTM, UP TO 16 KLBS WOB - PU 343 KLBS, $O 179 KLBS, ROT 213 KLBS -MW IN/OUT=10.7 PPG, NO LOSSES DRILLING AHEAD -ECD CLEANHOLE= 11.4 PPG, ACTUAL= 11.7-11.9 PPG, HARDLINE = 12.2 PPG - GASWATCH BACKGROUND RANGE =100 UNITS, MAX = 200 UNITS - NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 90' FOR DIRECTIONAL MONITORING - SOFT SPEED ENABLED CIRCULATE IX BOTTOMS UP - 650 GPM, 4143 PSI - 60 RPM, 25 KFT-LBS TORQUE - RECIPROCATE 30' CLOSE ANDERREAMER - DROP BALLAND PUMP DOWN AT 3.5 BPM, 460 PSI - OBSERVE PRESSRE SPIKE TO 2100 PSI, INDICATING ANDERREAMER CLOSED 17:00 North America - ALASKA - BP Page 25 of 35 DRILL Operation Summary Report 19:00 Common Well Name: NK -08 0.50 AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date. 3/22/2019 End Date: 4/16/2019 X3 -0199F -O (8,452,503.00 ) Project: Niakuk Site: NK P Rig Name/No.: PARKER 272 Spud DatelTime: 7/14/1994 12.00:OOAM Rig Release: 4/22/2019 Rig Contractor. PARKER DRILLING CO. P BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations 15,937.00 INTI 'MAKE UPAND RUN RETRIEVABLE HANG OFF 11:00 - 17:00 8.00 DRILL P 15,937.00 INTI PULL OUT OF THE HOLE ON ELEVATORS TOOL TO BOTTOM OF STAND FROM 15,937' MD TO THE TOP OF THE -RUN IN HOLE 1 FULL STAND AND ROTATE WINDOWAT9776'MD -SET DOWN STRING WEIGHTAND BACK OUT - MONITOR WELL FOR 10 MIN PRIOR TO OF TOOL BY HAND WITH 20 TURNS TO THE PULLING OFF BOTTOM AND AT THE TOP OF - HANG 190 KL_BS OFF RHOT THE WINDOW (STATIC) INTI RIG UP TO TEST BOPE - MONITOR DISPLACEMENT ON TRIP TANKS - RIG UP TEST JOINT ASSEMBLIES (GOOD DISPLACEMENT) - CHANGE OUT AIR BOOTS ON FLOW RISER -MUD WEIGHT IN/OUT =10.7 PPG 17:00 - 1900. 2.00 DRILL P 19:00 - 19:30 0.50 DRILL P 1930 - 21:30 2.00 DRILL P 21:30 - 00:00 2.50 DRILL P 4(7/2019 0000 - 0330 3.50 DRILL P 03:30 - 04:30 1.00 DRILL P Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths" -- OBSERVE -40 KLBS OVERPULL ON BOTTOM, ENGAGE PUMPS AT 5.5 BPM AND ATTEMPT TO PULL WITH NO SUCCESS, ENGAGE ROTATION AT 30 RPM, 25 KFT-LBS TORQUE AND PULL WITH NO PROBLEM, PULL 1 STAND WITH PUMPSAND ROTARY, THEN PULL OUT OF THE HOLE ON ELEVATORS TO _ THE WINDOW WITH NO ISSUES. _ 15,937.00, INTI CIRCULATE 2X BOTTOMS UPAT THE TOP OF THE WINDOW -720 GPM, 4459 PSI - SPOT EP MUD LUBE SWEEP OUT OF THE 'BIT _ 15,937.00 INTI 'MAKE UPAND RUN RETRIEVABLE HANG OFF TOOL (RHOT) TO HANG STRING OFFAT -90' -INSTALL DRILLPIPE SCREEN, MAKE UP TOOL TO BOTTOM OF STAND -RUN IN HOLE 1 FULL STAND AND ROTATE TO THE RIGHT 1/2 TURN -SET DOWN STRING WEIGHTAND BACK OUT OF TOOL BY HAND WITH 20 TURNS TO THE LEFT - HANG 190 KL_BS OFF RHOT _ 15,937.00 INTI RIG UP TO TEST BOPE - PULL WEAR BUSHING AND SET TEST PLUG - RIG UP TEST JOINT ASSEMBLIES - CHANGE OUT AIR BOOTS ON FLOW RISER FILLSTACKAND BLEED AIR FROM BOPE 15,937.00 INTI PRESSURE TEST BOPE TO 250 PSI LOWAND 4000 PSI HIGH FOR 5 MIN EACH - PRESSURE TESTANNULAR 7O 3500 PSI ON HIGH SIDE - TEST WITH 5" AND 2-7/8" TEST JOINTS - MONITOR THE WELL WITH CONTINUOUS HOLE FILL BELOW THE TEST PLUG (STATIC) - TEST WITNESS WAIVED BY AOGCC REP LOU LAUBENSTEIN 15,937.00 INTI PRESSURE TEST BOPE TO 250 PSI LOWAND 4000 PSI HIGH FOR 5 MIN EACH - PRESSURE TESTANNULAR TO 3500 PSI ON HIGH SIDE - TEST WITH 5" AND 2-7/8" TEST JOINTS - MONITOR THE WELL WITH CONTINUOUS HOLE FILL BELOW THE TEST PLUG (STATIC) - i FAIUPASS ON CHOKE VALVE - SEE ATTACHED TEST CHARTS - TEST WITNESS WAIVED BYAOGCC REP LOU LAUBENSTEIN 15,937.00 INTI RIG DOWN TESTING EQUIPMENT - PULL TEST PLUG AND SET WEAR BUSHING - BLOW DOWN TESTING EQUIPMENT Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths" Common Well Name. NK -08 Event Type: RE-ENTER- ONSHORE(RON) Project: Niakuk North America -ALASKA - BP Page 26 of 35 Operation Summary Report Start Dale: 3/22/2019 End Date: 4/16/2019 Site: NK AFE No X3 -0199F -C: (8,452,503.00 ) Rig Contractor: PARKER DRILLING CO. Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) BPUOI: USA00001319 Date From - To Hire Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 04:30 - 06:00 1.50 DRILL P 15,937.00 INTI PULLAND LAY DOWN RHOT - MAKE UP RHOT RUNNING TOOL, RUN IN AND MAKE UP TO STRING - PULL RHOT TO FLOOR AND LAY DOWN 0600 - 0700 1.00 DRILL P 15,937.00 INT1 CUT AND SLIP 64' OF DRILLING LINE -CALIBRATE BLOCK HEIGHT 07:00 - 11:30 4.50 DRILL P 15,937.00 INT1 RUN IN THE HOLE ON ELEVATORS FROM THE WINDOWAT 9776'MD TO BOTTOM AT 15,937' MD - OBSERVE TIGHT HOLE WHILE RUNNING TRHOUGH THE KUPARUK FORMATION FROM _ 15100' MD TO 15460' MD 11:30 - 1200 0.50 DRILL P 15937.00 INT1 'RIG SERVICE 1200 - 1400 2.00 DRILL N 15,937.00 INT1 'REPAIR MUD PUMP 14:00 - 16:00 2.00 DRILL N 15,937.00 INT1 CIRCULATE AT REDUCED RATE :-400 GPM, 2100 PSI 16:00 - 18:00 2.00 DRILL P 15,93200 INT1 CIRCULATE HOLE CLEAN - 620 GPM, 4230 PSI -100 RPM, 30 KFT-LBS TORQUE -MUD PUMP MODULE WASHED OUT, PUMP AT 400 GPM ON ONE PUMP WHILE REPAIRING THE OTHER PUMP 18:00 - 1900 1.00 DRILL P 15,93200 INTI PULL OUT OF THE HOLE ON ELEVATORS FROM 15937 MD TO THE BOTTOM OF THE j KUPARUKAT 15460' MD - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM (STATIC) - MUD WEIGHT IN/OUT = 10.7 PPG - OBSERVE TIGHT SPOTAT 15814' MD, WORK THROUGH TIGHT SPOT WITH 40 KLBS OVERPULL 1900 - 2200 3.00 DRILL P 15,937.00 INT1 BACKREAM TO THE TOP OF THE KUPARUK FROM 15,460' MD TO 15,100' MD - BACKREAM AT 625 GPM, 4315 PSI, 180 - 250 FPH PULLING SPEED PUMP 2 BOTTOMS UP WHILE BACKREAMING, NO ISSUES AND NO MAJOR INCREASE IN CUTTINGS AT THE SHAKERS WHILE BACKREAMING 2200 - 2230 0.50 DRILL P 15,937.00 INTI TRIP IN THE HOLE ON ELEVATORS FROM 15,100' MD TO BOTTOM AT 15,937' MD - NO ISSUES TRIPPING THROUGH THE KUPARUK - NO FILL OBSERVED ON BOTTOM 22:30 - 00:00 1,50 DRILL P 15,937.00 INTI CIRCULATE 1.SX BOTTOMS UP - 625 GPM, 4250 PSI -120 RPM, 29 KFT-LBS TORQUE 4/8/2019 00:00 - 01:00 1.00 DRILL P 15,937.00 INTI CONTINUE TO CIRCULATE 1.5X BOTTOMS UP - 625 GPM, 4250 PSI - 120 RPM, 29 KFT-LBS TORQUE - SPOT 35 BBL.5% LUBE PILL ON BOTTOM FOR LINER RUN Printed 5/9/2019 8:50.33AM "All depths reported in Drillers Depths'" Common Well Name: NK -08 Event Type: RE-ENTER- ONSHORE(RON) Project: Niakuk North America - ALASKA - BP Operation Summary Report Start Date: 3/22/2019 Site: NK Rig Contractor: PARKER DRILLING CO. Active datum: ACTUAL KB P272 Q67.45usft (above Mean Sea Level) Date From - To Him Task Code (hr) 01:00 - 06:00 5.00 DRILL P Page 27 of 35 AFE No End Date 4/16/2019 X3 -0199F -C'. (8.452,503 00 ) Rig Release: 4/22/2019 BPUOI', USA00001319 NPT Total Depth Phase Description of Operations (usfl) - - 15,937.00 INTI PULL OUT OF THE HOLE ON ELEVATORS VBR - CLOSE BLIND RAMS AND MONITOR THE WELL WITH CONTINUOUS HOLE FILL UNDER THE BLIND RAMS - PRESSURE TEST UPPER RAMS TO 250 PSI LOW AND 4000 PSI HIGH FOR 5 MIN EACH - TEST WITH 5" AND 7" TEST JOINTS SIMOPS: - RIG UP DOYON CASING RUNNING EQUIPMENT WBS:INTICSG 20:30 - 00:00 3.50 CASING P 15,937.00 INTI RUN 7", 26#, L-80, INTERMEDIATE LINER TO 1357' MD AT MIDNIGHT - CHECK FLOATS (HOLDING) - USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE CONNECTIONS TO 11,950 FT -LBS - FILL ON THE FLYAND TOP OFF EVERY 10 - PU 62K, SO 42K 4/9/2019 0000 - 09'.00 9.00 CASING P 15,937.00 INTI RUN 7-, 2611, L-80, INTERMEDIATE LINER FROM 1357' MD TO TOTAL LINER LENGTH OF 6335' MD - USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE CONNECTIONS TO 11,950 FT -LBS - FILL ON THE FLY AND TOP OFF EVERY 10 - PU 140 KLBS, SO 88 KLBS MAKE UP LINER HANGER/PACKER ASSEMBLY - ADD PAL MIX - CIRCULATE 1X LINER VOLUMES AT 7 BPM, 566 PSI Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths** FROM BOTTOM AT 15,937' MD TO THE TOP OF THE WINDOW AT 9776' MD - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM AND AT THE WINDOW (STATIC) - MONITOR DISPLACEMENT ON THE TRIP TANKS (HOLE TAKING PROPER DISPLACEMENT) -MUD WEIGHT IN/OUT= 10.7 PPG 0600 - 0730 1.50 DRILL P 15937.00 INTI CIRCULATE 2 BOTTOMS UP AT THE TOP OF THE WINDOW - 700 GPM, 4200 PSI - 170 RPM, 8 KFT-LBS TORQUE 0730 - 1300 5.50 DRILL P 15,937.00 INTI PULL OUT OF THE HOLE ON ELEVATORS FROM 9776' MD TO THE TOP OF THE BHA AT 953' MD - MONITOR THE WELL FOR 10 MIN AT THE TOP OF THE BHA (STATIC) - MONITOR DISPLACEMENT ON THE TRIP TANKS (HOLE TAKING PROPER DISPLACEMENT) 13'.00 - 1530 2.50 DRILL P 15,937.00 INTI . LAY DOWN BHA FROM 953'MD TO SURFACE -BIT GRADE: 1 -1 -IN GAGE 15:30 - 1600 0.50 DRILL P 15,937.00 INTI CLEAN AND CLEAR RIG FLOOR 16:00 - 2030 4.50 CASING P 15,937.00 INTI CHANGE OUT UPPER RAMS TO 4-112"X 7" VBR - CLOSE BLIND RAMS AND MONITOR THE WELL WITH CONTINUOUS HOLE FILL UNDER THE BLIND RAMS - PRESSURE TEST UPPER RAMS TO 250 PSI LOW AND 4000 PSI HIGH FOR 5 MIN EACH - TEST WITH 5" AND 7" TEST JOINTS SIMOPS: - RIG UP DOYON CASING RUNNING EQUIPMENT WBS:INTICSG 20:30 - 00:00 3.50 CASING P 15,937.00 INTI RUN 7", 26#, L-80, INTERMEDIATE LINER TO 1357' MD AT MIDNIGHT - CHECK FLOATS (HOLDING) - USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE CONNECTIONS TO 11,950 FT -LBS - FILL ON THE FLYAND TOP OFF EVERY 10 - PU 62K, SO 42K 4/9/2019 0000 - 09'.00 9.00 CASING P 15,937.00 INTI RUN 7-, 2611, L-80, INTERMEDIATE LINER FROM 1357' MD TO TOTAL LINER LENGTH OF 6335' MD - USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE CONNECTIONS TO 11,950 FT -LBS - FILL ON THE FLY AND TOP OFF EVERY 10 - PU 140 KLBS, SO 88 KLBS MAKE UP LINER HANGER/PACKER ASSEMBLY - ADD PAL MIX - CIRCULATE 1X LINER VOLUMES AT 7 BPM, 566 PSI Printed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths** 12:00 - 14:00 2.00 CASING P 1400 - 22:30 8.50 CASING P 2230 - 00'.00 1.50 CASING 4/10/2019 0000 - 0200 2.00 CASING P P North America - ALASKA - BP Page 28 or 35 AND AAR Operation Summary Report INT1 SLIP AND CUT 450'OF DRILL LINE Common Well Name: NK -08 - RECALIBRATE BLOCKHEIGHT AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/22/2019 End Date: 4/162019 X3 -0199F -C. (8,452,503.00 ) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud DateRme: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. .- CIRCULATE DOWN S CONSECUTIVE BPUOI: USA00001319 Active datum: ACTUAL KB P272 Q67.45usft (above Mean Sea Level) Date From To Him Task Code NPT Total Depth Phase Description of Operations (hr)_ (usft) __ 09:00 - 12:00 3.00 CASING P 15,937.00 INTI -_CONTINUE IN HOLE WITH THE LINER ON 5" - TOP OF LINER AT 9600' MD DP TO THE 9-5/8" WINDOW AT 9776' MD - NO TIGHT SPOTS OBSERVED, COULD NOT - RIH AT 90 FT/MIN - FILL PIPE AND CIRCULATE THE LAST STAND -CIRCULATE 1.5X BOTTOMS UP AT 7 BPM, DOWN AT 2 BPM, 480 PSI, OBTAIN PU AND 640 PSI SO 140K - PU 180 KLBS, SO 97 KLBS 12:00 - 14:00 2.00 CASING P 1400 - 22:30 8.50 CASING P 2230 - 00'.00 1.50 CASING 4/10/2019 0000 - 0200 2.00 CASING P P Printed 5/92019 8:50:33AM **All depths reported in Drillers Depths" -PERFORM D1 KICK WHILE TRIPPING DRILL AND AAR 15,937.00 INT1 SLIP AND CUT 450'OF DRILL LINE - RECALIBRATE BLOCKHEIGHT 15,937.00 INT1 RUN INTO OPEN HOLE WITH LINER FROM 9776' MD TO PLANNED SET DEPTH AT 15935' MD - BREAK CIRCULATION EVERY 5 STANDS AT 5 • BPM FOR -5 MINUTES .- CIRCULATE DOWN S CONSECUTIVE STANDS TO ACHIEVE 1X BOTTOMS UP PRIOR TO THE TOP OF THE HRZ - OBTAIN PU/SO WEIGHTS EVERY 5 STANDS - PU 420K SO 140K - MUD WEIGHT: 10.7 PPG IN, 10.7 PPG OUT - MUD LOSSES WHILE RIH: 20 BBLS - TOP OF LINER AT 9600' MD - NO TIGHT SPOTS OBSERVED, COULD NOT PICK UP WITHOUT PUMPSAFTER 15,600' MD - FILL PIPE AND CIRCULATE THE LAST STAND DOWN AT 2 BPM, 480 PSI, OBTAIN PU AND SLACKOFF ON THE LAST STAND, PU 420K, SO 140K -PICK UP THE CEMENT AND SINGLE DRILL PIPE, WASH TO BOTTOM, TAG BOTTOM UNABLE TO PULL OFF BOTTOM, PULL UP TO 450 KLBS, NO CHANGE IN CIRCULATING PRESSURE OR FLOW OUT. 15,937.00 INT1 STAGE UP PUMPS TO CEMENTING RATES IN 1 BBL INCREMENTSAND CONDITION MUD TO CEMENTING PROPERTIES - @ 3 BPM, 530 PSI - @ 7 BPM, 1050 PSI - RECIPROCATE PIPE STRETCH - NO LOSSES WHILE CIRCULATING - ATTEMPT TO PICK UP OFF BOTTOM AT FULL RATE WITH NO SUCCESS, PULL UP TO 450 KLBS, DISCUSS WITH ODE, DECIDE TO LEAVE STRING ON BOTTOM AND RECIPROCATE PIPE STRETCH 15,937.00 INT1 CONDITION MUD - 7 BPM, 1050 PSI - CONDITION MUD TO 10.7 PPG, 13 PV, 17 YP - INITIAL PRESSURE AT CEMENTING RATE: 1050 PSI - FINAL PRESSURE AT CEMENTING RATE AFTER HOLE CONDITIONED: 1000 PSI - CIRCULATE 1 TOTAL CIRCULATION - RECIPROCATE PIPE STRETCH Printed 5/92019 8:50:33AM **All depths reported in Drillers Depths" North America - ALASKA- Blo Operation Summary Report Common Well Name'. NK -08 Event Type: RE-ENTER- ONSHORE(RON) Start Date: 3/22/2019 Project: Niakuk Site: NK AFE No End Date'. 4/16/2019 X3 -0199F -C.(8,452,503.00) Page 29 of 35 1 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) X02:00 - 05:00 3.00 CASING P 15,937.00 INTI CEMENT 7" INTERMEDIATE LINERAS FOLLOWS: - FILL LINES WITH WATER AND PRESSURE TEST TO 4500 PSI FOR 5 MINUTES - PUMP 40 BBLS OF 12 PPG MUDPUSH II SPACER @ 5 BPM, 600 PSI - DROP BOTTOM DRILL PIPE WIPER DART 0500 - 0600 1.00 CASING P 06.00 - 07:00 1.00 CASING P 0700 - 1200 5.00 CASING P 1200 - 1230 0.50 CASING P 15,937.00 15,937.00 15,937.00 15,937.00 - DROP UPPER DRILL PIPE WIPER DART - RECIPROCATED PIPE STRETCH AT SURFACE WHILE PUMPING - PUMP 10 BBL FRESH WATER WITH SLB PERFORM DISPLACEMENT WITH RIG PUMPS - 379 BBLS DISPLACED AT 7 BPM: ICP 500 PSI, FCP 1800 PSI, SLOW PUMPS TO 3 BPM FOR LOWER AND UPPER DRILL PIPE WIPER DART LATCH, DID NOT SEE BOTTOM WIPER DART LATCH, OBSERVE UPPER WIPER DART LATCH AT 1595 STROKES (147.5 BBL) INTO DISPLACEMENT, RECALCULATE DISPLACEMENT FOR BUMP - 6.3 BBLS DISPLACED AT 3 BPM: ICP 1070 PSI, FCP 1090 PSI -DISPLACEMENT FLUID: 10 BBL OF FRESH WATER AND 385.5 BBLS OF 10.7 PPG LSND - REDUCE RATE TO 3 BPM PRIOR TO PLUG - TOTAL DISPLACEMENT VOLUME 395.5 BBLS (MEASURED BY STROKES @ 96% PUMP EFFICIENCY) - RECIPROCATE PIPE STRETCH SURFACE DURING DISPLACEMENT, STOPPED RECIPROCATION WHEN PRESSURE EXCEEDED 1300 PSI - TOTAL LOSSES FROM CEMENT EXIT SHOE _ TO CEMENT IN PLACE: 0 BBLS - INCREASE PRESSURE TO 1600 PSI AFTER PLUG BUMP - BLEED OFF PRESSURE (3 BBL BACK) CHECK FLOATS - GOOD -CIP@04:45 INTI SETAND RELEASE FROM LINER HANGER PER WEATHERFORD REPRESENTATIVE - PRESSURE UP TO 3000 PSI TO SET HANGER -RELEASE FROM HANGER - SET DOWN 60 KLBS AND SET LINER TOP PACKER INT1 CIRCULATE 1.5x BOTTOMS UP AT TOP OF LINER _- 700 GPM ,_94_0 PSI INT1 PULL OUT OF THE HOLE AND LAY DOWN WEATHERFORD LINER RUNNING TOOL - MONITOR THE WELL FOR 10 MIN: STATIC - PU 187 KLBS, SO 89 KLBS AT 9590' MD - MONITOR WELL WITH HOLE FILL AND TRIP TANK: GOOD FILL - MUD WEIGHT IN/OUT= 10.6 PPG INT1 CLEAN AND CLEAR RIG FLOOR Printed 5/9/2019 8:50:33AM "AII depths reported in Drillers Depths" North America -ALASKA - BP Page 30 of 35 Operation Summary Report Common Well Name. NK -08 AFE No Event Type. RE -ENTER -ONSHORE (RON) Start Date: 3122/2019 End Date. 4/16/2019 X3 -0199F -C'. (8,452,503.00 ) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM Rig Release: 4222019 Rig Contractor: PARKER DRILLING CO. BPUO1: USA00001319 Active datum: ACTUAL KB P272 @87 45usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 1230 - 1400 1.50 BOPSUR P 15,937.00 INTI CHANGE UPPER RAMS FORM 7" TO 2-7/8" x 5" VBR - DRAIN STACK - CLOSE BLIND/SHEAR RAMS AND CHANGE 'UPPER RAMS 1400 - 1430 0.50 BOPSUR P 15,937.00 INTI PULL WEAR RING AND RIG UP TO PRESSURE TEST UPPER RAMS - PULL WEAR RING - INSTALLTEST PLUG AND FILL STACK _ - MAKE UP TEST JOINTS 14:30 - 15:30 1.00 BOPSUR P 15,937.00 INTI PRESSURE TEST UPPER PIPE RAMS WITH 2-7/8" AND 5" TEST JOINTS - TEST TO 250 / 4000 PSI FOR 5 CHARTED MIN EACH - TEST WITNESSED BY RIG MANAGERAND 'WSL SEE ATTACHED TEST CHART j 15:30 - 16:00 0.50 BOPSUR P 15,937.00 INT1 PULL TEST PLUG AND INSTALL WEAR RING (w. ID_)_ 16:00 - 18:00 2.00 CASING P 15,937.00 INT c TEST 7" LINER TO 4000 PSI FOR 30 CHARTED MIN - RIG UP TO TEST LINER - 13 BBLS TO PRESSURE UP/BLED BACK 13 BBLS - LOST 75 PSI IN THE FIRST 15 MIN, 5 PSI IN THE SECOND 15 MIN - TEST MET BP CRITERIA PER BP PRACTICE 100218 - RECEIVED AUTHORIZATION TO PROCEED FROM WOS (WSUP DESIGNATE) - SEE ATTACHED TEST CHART AND CRITERIA CALCULATOR 18:00 - 20:30 2.50 CASING P 15,937.00 INTI MAKE UP 6-1/8" PRODUCTION HOLE DRILLING ASSEMBLY PER BAKER DD/MWD REPRESENTATIVES - MAKE UP BIT, AUTOTRAK, ONTRACK, BCPM, SDN AND NOWMAGS - PLUG IN AND VERIFY MWD TOOLS _ - PU 44 KLBS, SO 44 KLBS AT 151' MD 2030 - 0000 3.50 CASING P 15,937.00 INT1 RUN IN THE HOLE WITH 6-1/8" PROD1 DRILLING BHA ON ELEVATORS TO 4530' MD - SHALLOW HOLE TEST MWD TOOLS AT 1099' MD: 300 GPM, 1220 PSI - FILL PIPE EVERY 2000'MD -MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD DISPLACEMENT -MUD WEIGHT IN/OUT =10.6 PPG_ 4/112019 00:00 - 03:30 3.50 CASING P 15,937.00 INT1 CONTINUE TO RUN IN THE HOLE WITH 6-1/8" PROD1 DRILLING BHA ON ELEVATORS FROM 4530' MD TO 11050' MD - FILL PIPE EVERY 2000'MD -MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD DISPLACEMENT _ -MUD WEIGHT IN/OUT =10.6 PPG 03:30 - 05:00 1.50 CASING P 15,937.00 INT1 UNANNOUNCED D1, KICK WHILE TRIPPING DRILL FOLLOWED WITH D5, WELL KILL DRI LL AND AAR WITH RIG CREW - 1 MIN 30 SEC TO WELL SECURE - BLOW DOWN CHOKE MANIFOLD AND MGS 0500 - 0600 1.00 CASING P 15,937.00 INT1 CHANGE OUT NC50 SAVER SUB Printed 5/92019 8:50.33AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 31 of 35 Common Well Name: NK -08 - 17:30 3.00 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/22/2019 End Date. 4/16/2019 X3 -0199F -C'. (B, 452,503.00 ) Project: Niakuk Site: NK 1730 Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM 15,937.00 Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. 2000 - 21:00 BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) P Date From - To Him Task Code NPT Total DepthPhase Description of Operations - — (hr) (usn) _ 06:00 - 09:00 3.00 CASING P 15,937.00 INTI CONTINUE TO RUN IN THE HOLE WITH 6-1/8' 09:00 - 1430 5.50 CASING P 1430 - 17:30 3.00 CASING P 4/12/2019 0000 - 01:00 1.00 CASING P 1730 - 2000 2.50 15,937.00 CASING P 2000 - 21:00 1.00 CASING P 21:00 - 22:30 1.50 CASING P TO 15937' MD - 300 GPM, 1790 PSI - 100 RPM, 17 KFT-LBS TORQUE - PU 252 KLBS, SO 157 KLBS, ROT 192 KLBS MUD WEIGHT IN/OUT =9.4 PPG - FLOW CHECK WELL FOR 15 MIN TO ISOLATED TRIP TANKAFTER DRILLING SHOE: WELL STATIC 15,937.00 INT1 DRILL 20' OF NEW FORMATION FROM 15937' MO TO 15957' MD - 300 GPM, 1790 PSI 100 RPM, 17 KFT-LBS TORQUE - PU 252 KLBS, SO 157 KLBS, ROT 192 KLBS -MUD WEIGHT IN/OUT= 9.4 PPG 15,93700 INTI CIRCULATE IX BOTTOMS UPAND PULL TO 7" SHOE AT 15937' MD - 350 GPM, 2220 PSI - RECIPROCATE PIPE 50' AT 60 RPM 15,937.00 INTI RIG UP AND PERFORM FIT TO 10.6 PPG EMW - MUD WEIGHT IN/OUT = 9.4 PPG - T' SHOE AT 15937' MD, 9882' TVD - PUMP 1.2 BBLS TO 625 PSI - BLED BACK 1.2 BBLS - 10.6 PPG EMW - ODE APPROVED FIT Printed 5/9/2019 8:5033AM **All depths reported in Drillers Depths" 2230 - 0000 1.50 CASING P 4/12/2019 0000 - 01:00 1.00 CASING P TO 15937' MD - 300 GPM, 1790 PSI - 100 RPM, 17 KFT-LBS TORQUE - PU 252 KLBS, SO 157 KLBS, ROT 192 KLBS MUD WEIGHT IN/OUT =9.4 PPG - FLOW CHECK WELL FOR 15 MIN TO ISOLATED TRIP TANKAFTER DRILLING SHOE: WELL STATIC 15,937.00 INT1 DRILL 20' OF NEW FORMATION FROM 15937' MO TO 15957' MD - 300 GPM, 1790 PSI 100 RPM, 17 KFT-LBS TORQUE - PU 252 KLBS, SO 157 KLBS, ROT 192 KLBS -MUD WEIGHT IN/OUT= 9.4 PPG 15,93700 INTI CIRCULATE IX BOTTOMS UPAND PULL TO 7" SHOE AT 15937' MD - 350 GPM, 2220 PSI - RECIPROCATE PIPE 50' AT 60 RPM 15,937.00 INTI RIG UP AND PERFORM FIT TO 10.6 PPG EMW - MUD WEIGHT IN/OUT = 9.4 PPG - T' SHOE AT 15937' MD, 9882' TVD - PUMP 1.2 BBLS TO 625 PSI - BLED BACK 1.2 BBLS - 10.6 PPG EMW - ODE APPROVED FIT Printed 5/9/2019 8:5033AM **All depths reported in Drillers Depths" PROD1 DRILLING BHA ON ELEVATORS FROM 11050' MD TO 15760' MD - FILL PIPE EVERY 2000'MD '- MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD DISPLACEMENT -MUD WEIGHT IN/OUT= 10.7 PPG -PU 260 KLBS; SO 130 KLBS 15,937.00 INTI TAGCEMENTAND DRILL FLOAT EQUIPMENT AND CEMENT IN SHOE TRACK FROM 15765' MD TO 15923' MD (10' FROM SHOE) '-TAG CEMENT AT 15765'MD - DRILL PLUGS AND LANDING COLLAR AT 15844' MD - 300 GPM, 2875 PSI -50-70 RPM, 19-23 KFT-LBS TORQUE - 8-12 KLBS WOB - MUD WEIGHT IN/OUT = 10.7 PPG - PU 258 KLBS, SO 140 KLBS, ROT 183 KLBS PHASE 2 WEATHER CONDITIONS CALLED FIELD-WIDEAT 11:50 AM 15,937.00 INT1 DISPLACE WELL FROM 10.7 PPG LSND TO 9.4 PPG QUIKDRIL-N - 7 BPM, ICP - 2849 PSI, FCP - 1888 PSI - MUD WEIGHT IN/OUT= 9.4 PPG - RECORD NEW SLOW PUMP RATES - PU 252 KLBS, SO 157 KLBS 15,937.00 INTI CLEAN PITS AND TAKE ON 9.4 PPG _QUICK -GRIL TO ACTIVE AND RESERVE PITS 15,937.00 INT1 DRILL REMAIN SHOE TRACK FROM 15923' MD TO 15937' MD - 300 GPM, 1790 PSI - 100 RPM, 17 KFT-LBS TORQUE - PU 252 KLBS, SO 157 KLBS, ROT 192 KLBS MUD WEIGHT IN/OUT =9.4 PPG - FLOW CHECK WELL FOR 15 MIN TO ISOLATED TRIP TANKAFTER DRILLING SHOE: WELL STATIC 15,937.00 INT1 DRILL 20' OF NEW FORMATION FROM 15937' MO TO 15957' MD - 300 GPM, 1790 PSI 100 RPM, 17 KFT-LBS TORQUE - PU 252 KLBS, SO 157 KLBS, ROT 192 KLBS -MUD WEIGHT IN/OUT= 9.4 PPG 15,93700 INTI CIRCULATE IX BOTTOMS UPAND PULL TO 7" SHOE AT 15937' MD - 350 GPM, 2220 PSI - RECIPROCATE PIPE 50' AT 60 RPM 15,937.00 INTI RIG UP AND PERFORM FIT TO 10.6 PPG EMW - MUD WEIGHT IN/OUT = 9.4 PPG - T' SHOE AT 15937' MD, 9882' TVD - PUMP 1.2 BBLS TO 625 PSI - BLED BACK 1.2 BBLS - 10.6 PPG EMW - ODE APPROVED FIT Printed 5/9/2019 8:5033AM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 32 of 35 Operation Summary Report Common Well Name: NK -08 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Dale. 3/22/2019 End Date: 4/16/2019 X3 -0199F -C: (8,452,503.00 ) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum ACTUAL KB P272 @67 45usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 01:00 - 12:00 11.00 DRILL P 16,324.00 PROD1 DIRECTIONAL DRILL 6-1/8" PRODUCTION HOLE BUILD SECTION FROM 15957' MD TOAT 16324' MD (10113' TVD) - 367 FT IN 11.0 HRS = 33.4 FT/HR WITH CONNECTIONS -INSTANTANEOUS ROP 20-100 FPH - 300 GPM, 1860/1855 PSI ON/OFF BTM, 150 RPM, 20/17 KFT-LBS TORQUE ON/OFF BTM, 10-18 KLBS WOB - PU 260 KLBS, SO 155 KLBS, ROT 193 KLBS AT 16324' MD - SURVEY EVERY 30' - MUD WEIGHT IN/OUT = 9APPG BUILD INCLINATION FROM 35° TO 70° TOP OF SHUBLIKAT 16037' MD, 9961' TVD TOP OF ZONE 4 AT 16134' MD, 10028' TVD WBS:PROD1 1200 - 0000 12.00 _ DRILL P 16,798.00 PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 16324' MD TO AT 16798' MD (10107- TVD) -474 FT IN 12.0 HRS=39.5 FT/HR WITH 'CONNECTIONS - INSTANTANEOUS ROP 20-100 FPH - 300 GPM, 1918/1890 PSI ON/OFF BTM, 150 RPM, 20/18 KFT-LBS TORQUE ON/OFF BTM, 18 KLBS WOB - PU 251 KLBS, SO 156 KLBS, ROT 192 KLBS AT 16704' MD - SURVEY EVERY 30' - MUD WEIGHT IN/OUT = 9APPG 4/13/2019 00:00 - 12:00 1200 DRILL P 17,30200 BUILD INCLINATION FROM 70° TO 110° LAND BUILD SECTIONAT 16522' MDAND BEGIN INVERT SWEEPS: 16418' MD: 35 BBL HIGH -VIS SWEEP WITH 25% INCREASE IN CUTTINGS OBSERVED PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 16798' MD TO 17302' MD - 504 FT IN 12 HRS = 42.0 FT/HR WITH CONNECTIONS - INSTANTANEOUS ROP 20-100 FPH - 300 GPM, 2010/1995 PSI ON/OFF BTM, 150 RPM, 22/20 KFT-LBS TORQUE ON/OFF BTM, 18 KLBS WOB - PU 255 KLBS, SO 150 KLBS, ROT 183 KLBS AT 17270' MD - SURVEY EVERY 30' - MUD WEIGHT IN/OUT = 9APPG SWEEPS: 16896' MD: 35 BBL HIGH -VIS SWEEP WITH 50% INCREASE IN CUTTINGS OBSERVED Printed 5/9/2019 8:50r33AM **All depths reported in Drillers Depths" North America - ALASKA- Blo Operation Summary Report Common Well Name. NK -08 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 3/22/2019 End Date: 4/16/2019 X3 -0199F -C: (8,452,503.00 ) Project: Niakuk Site: NK Rig NameMo.: PARKER 272 Spud Date/Time: 7/14/1994 12.00:OOAM Rig Release: 4/22/2019 BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Page 33 of 35 Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr). (usft) _ _ 12:00 - 00:00 12.00 DRILL P 17,901.00 PROD1 DIRECTIONAL DRILL 6-1/8" PRODUCTION HOLE FROM 17302' MD TO 17901' MD - 599 FT IN 12 HRS = 49.9 FT/HR WITH CONNECTIONS - INSTANTANEOUS ROP 20-100 FPH - 300 GPM, 2011/2022 PSI ON/OFF BTM, 150 RPM, 21/19 KFT-LBS TORQUE ON/OFF BTM, 18 KLBS WOB - PU 261 KLBS, SO 156 KLBS, ROT 190 KLBS AT 17901' MD - SURVEY EVERY 30' "MUD WEIGHT IN/OUT = 9APPG - NO LOSSES OBSERVED WHILE DRILLING SWEEPS: 17500' MD: 35 BBL HIGH -VIS SWEEP WITH NO INCREASE IN CUTTINGS OBSERVED 4/14/2019 0000 - 1200 12.00 DRILL P 18,562.00 PROD1 DIRECTIONAL DRILL 6-1/8" PRODUCTION HOLE FROM 17901' MD TO 18562' MD -661 FT IN 12 HRS = 55.1 FT/HR WITH 'CONNECTIONS -INSTANTANEOUS ROP 50400 FPH 300 GPM, 2250/2220 PSI ON/OFF BTM, 150 RPM, 22/20 KFT-LBS TORQUE ON/OFF BTM, 18 KLBS WOB !I - PU 267 KLBS, SO 153 KLBS, ROT 193 KLBS AT 18500' MD -SURVEY EVERY 30-90' - MUD WEIGHT IN/OUT = 9APPG -NO LOSSES OBSERVED WHILE DRILLING SWEEPS: 18044' MD: 35 BBL HIGH -VIS SWEEP WITH 25% INCREASE IN CUTTINGS OBSERVED 18512' MD: 35 BBL HIGH -VIS SWEEP, NO OBSERVABLE INCREASE IN CUTTINGS - DUMPED TO BOX _ 1200 - 1230 0.50 DRILL P 18,562.00 PROD1 D2, KICK WHILE DRILLING DRILLANDAAR WITH RIG CREW - CREW RESPONSE TIME TO SECURE THE WELL: 1 MIN 20 SEC PERFORM WEEKLY BOP FUNCTION TEST 12:30 - 00:00 11.50 DRILL P 19,255.00 PRODi DIRECTIONAL DRILL 6-1/8" PRODUCTION HOLE FROM 18562' MD TO 19255' MD - 693 FT IN 11.5 HRS = 60.3 FT/HR WITH CONNECTIONS - INSTANTANEOUS ROP 50-100 FPH - 300 GPM, 2195/2161 PSI ON/OFF BTM, 150 ! RPM, 23/20 KFT-LEIS TORQUE ON/OFF BTM, 18 KLBS WOB - PU 273 KLBS, SO 162 KLBS, ROT 195 KLBS AT 19255' MD - SURVEY EVERY 30-90' - MUD WEIGHT IN/OUT = 9APPG - NO LOSSES OBSERVED WHILE DRILLING SWEEPS: 19060' MD: 35 BBL HIGH -VIS SWEEP, NO OBSERVABLE INCREASE IN CUTTINGS - DUMPED TO BOX Printed 5/9/2019 8:50:33AM "All depths reported in Drillers Depths" North America - ALASKA - SP Operation Summary Report Common Well Name: NK -08 Event Type: RE-ENTER- ONSHORE (RON) Start Date. 3/22/2019 End Date: 4/16/2019 Project: Niakuk Site: NK AFE No (8,452,503.00 ) Page 34 of 35 Rig Name/No.: PARKER 272 - 05'.00 Spud Daterl ime: 7/14/1994 12:00:00AM Rig Release: 4/222019 Rig Contractor. PARKER DRILLING CO. - 09:30 450 DRILL BPUOI: USAD0001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) -MUD WEIGHT IN/OUT = 9.5 PPG Date From - To Him Task Code NPT Total Depth Phase Description of Operations ELEVATORS FROM 16796' MD TO 19858' MD (hr) (usft) 4/15/2019 00:00 - 10:00 10.00 DRILL P 19,858.00 PROD1 DIRECTIONAL DRILL 6-1/8" PRODUCTION 10.00 - 1400 4.00 DRILL 14:00 - 1900 5.00 DRILL 1900 - 2200 3.00 2200 - 2300 1.00 - 603 FT IN 10 HRS = 60.3 FT/HR WITH CONNECTIONS - INSTANTANEOUS ROP 50-100 FPH - 300 GPM, 2250/2200 PSI ON/OFF BTM, 150-120 RPM, 26/24 KFT-LBS TORQUE ON/OFF BTM, 18 KLBS WOB - PU 280 KLBS, SO 154 KLBS, ROT 197 KLBS AT 19858' MD - SURVEY EVERY 30-90' - MUD WEIGHT IN/OUT = 9.5 PPG -NO LOSSES OBSERVED WHILE DRILLING P 19,858.00 PROD? CIRCULATE THE HOLE CLEAN AT TO WITH 3X BOTTOMS UP - 350 GPM, 2770 PSI - 120 RPM, 23 KFT-LBS TORQUE P 19,858.00 PROD1 PUMP OUT OF THE HOLE FROM 19858' MD TO 15840' MD, INSIDE 7" LINER SHOE - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM: MINOR SEEPAGE LOSSES . - PUMP AT 2 BPM, 540 PSI -PULL AT 70 FT/MIN - PU 289 KLBS, SO 155 KLBS AT 19850MO -MONITOR THE WELL FOR 10 MIN AT THE 7" LINER SHOE: MINOR SEEPAGE LOSSES _ _-MUD WEIGHT IN/OUT=9.5PPG _...__ P 19,658.00 PROD1 CIRCULATE 2X BOTTOMS UP - 350 GPM, 2503 PSI DRILL P 19,858.00 PROD1 SLIP AND CUT DRILL LINE (51') CALIBRATE BLOCKS 23:00 - 00:00 1.00 DRILL 4/16/2019 00:00 - 01'.30 1.50 DRILL 01.30 - 05'.00 3.50 DRILL 0500 - 09:30 450 DRILL 093 10 11 00 1.50 DRILL P 19,658.00 PROD1 RUN IN THE HOLE ON ELEVATORS FROM 15855' MD TO 16796' MD - PU 265 KLBS, SO 150 KLBS AT 15855' MD -MUD WEIGHT IN/OUT = 9.5 PPG P 19,858.00 PROD1 CONTINUE TO RUN IN THE HOLE ON ELEVATORS FROM 16796' MD TO 19858' MD - FILL PIPE EVERY 2000' MD - MUD WEIGHT IN/OUT = 9.5 PPG -MONITOR DISPLACEMENT WITH TRIP TANK AND HOLE FILL: GOOD DISPLACEMENT P 19,858.00 PROD1 CIRCULATE THE HOLE CLEAN AT TD, 2.5X BOTTOMS UP - 350 GPM, 2800 PSI - 120 RPM, 18 KFT-LBS TORQUE - HOLE UNLOADED AT FIRST BOTTOMS UP P 19,858.00 PROD1 PUMP OUT OF THE HOLE FROM 19858' MD TO 15940' MD, INSIDE 7" SHOE - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM: MINOR SEEPAGE LOSSES - PUMP AT 84 GPM, 600 PSI - PULL AT 70 FT/MIN - PU 280 KLBS, SO 150 KLBS AT 19800' MD - MUD WEIGHT IN/OUT = 9.5 PPG P 19,858.00 PROD1 CIRCULATE 1X BOTTOMS UPAT THE 7" LINER SHOE - 300 GPM, 2000 PSI - 120 RPM, 12 KFT-LBS TORQUE - RECIPROCATE PIPE -90 FT Printed 5/9/2019 8:50:33AM ."All depths reported in Drillers Depths** North America - ALASKA - BP 20:00 - 22:00 2.00 DRILL P 19,858.00 PROD1 Primed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths" Page 35 of 35 AFE No X3 -0199F -C:(8,452,503.00) Rig Release: 4/22/2019 Description of Operations PULL OUT OF THE HOLE ON ELEVATORS FROM 15940' MD TO THE TOP OF THE BHAAT 151' MD - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OUT OF THE HOLE: MINOR SEEPAGE LOSSES (<2 BPH) - PU 265 KLBS, SO 150 KLBS AT 15940' MD - PULLAT 15 FPM FROM 15940' MD TO 15000' MD - PULLAT 30 FPM FROM 15000' MD TO 14000' MD - PULLAT 70 FPM FROM 14000' MD TO 13500' MD - PULLAT 90 FPM FROM 13500' MD TO 13000' MD - PULLAT 125 FPM FROM 13000' MD TO 12050' MD - PULLAT 150 FPM FROM 12050' MD TO 10500' MD - PULLAT 170-200 FPM FROM 10050' MD TO 151' MD - MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD FILL, CONTINUE TO SEE MINOR LOSSES (<2 BPH) - MUD WEIGHT IN/OUT = 9.5 PPG_ _ LAY DOWN 6-1/8" DRILLING ASSEMBLY PER BAKER DD./ MWD - MONITOR THE WELL FOR 10 MIN: MINOR SEEPAGE LOSSES (-1.5 BPH) - MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD FILL, CONTINUE TO SEE MINOR SEEPAGE LOSSES (<1.5 BPH) - MUD WEIGHT IN/OUT = 9.5 PPG - FLUSH MWD AND ROTARY STEERABLE WITH FRESH WATER -DULL BIT GRADE: 3 - 3 - CT - A- X - I - BT - TD "' END NK -08B RON EVENTAT 22:00 HRS "' Operation Summary Report Common Well Name: NK -08 Event Type: RE-ENTER- ONSHORE (RON) Start Date. 3/22/2019 End Date: 4/16/2019 Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00 OOAM Rig Contractor: PARKER DRILLING CO. Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase (hr) (usft) 11:00 - 20:00 9.00 DRILL P 19,858.00 PROW 20:00 - 22:00 2.00 DRILL P 19,858.00 PROD1 Primed 5/9/2019 8:50:33AM **All depths reported in Drillers Depths" Page 35 of 35 AFE No X3 -0199F -C:(8,452,503.00) Rig Release: 4/22/2019 Description of Operations PULL OUT OF THE HOLE ON ELEVATORS FROM 15940' MD TO THE TOP OF THE BHAAT 151' MD - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OUT OF THE HOLE: MINOR SEEPAGE LOSSES (<2 BPH) - PU 265 KLBS, SO 150 KLBS AT 15940' MD - PULLAT 15 FPM FROM 15940' MD TO 15000' MD - PULLAT 30 FPM FROM 15000' MD TO 14000' MD - PULLAT 70 FPM FROM 14000' MD TO 13500' MD - PULLAT 90 FPM FROM 13500' MD TO 13000' MD - PULLAT 125 FPM FROM 13000' MD TO 12050' MD - PULLAT 150 FPM FROM 12050' MD TO 10500' MD - PULLAT 170-200 FPM FROM 10050' MD TO 151' MD - MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD FILL, CONTINUE TO SEE MINOR LOSSES (<2 BPH) - MUD WEIGHT IN/OUT = 9.5 PPG_ _ LAY DOWN 6-1/8" DRILLING ASSEMBLY PER BAKER DD./ MWD - MONITOR THE WELL FOR 10 MIN: MINOR SEEPAGE LOSSES (-1.5 BPH) - MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD FILL, CONTINUE TO SEE MINOR SEEPAGE LOSSES (<1.5 BPH) - MUD WEIGHT IN/OUT = 9.5 PPG - FLUSH MWD AND ROTARY STEERABLE WITH FRESH WATER -DULL BIT GRADE: 3 - 3 - CT - A- X - I - BT - TD "' END NK -08B RON EVENTAT 22:00 HRS "' North America - ALASKA - BP Page 1 of 10 Operation Summary Report Common Well Name. NK -08 AFE No Event Type: COM- ONSHORE (CON) Start Date: 4/16/2019 End Date. 4/22/2019 X3 -0199F -C: (3,071,363.00 ) Proiect: Niakuk Site: NK Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 4/16/2019 2200 - 2230 0.50 CASING P 19,858.00 RUNPRD CLEAN AND CLEAR RIG FLOOR WSS:RUNPRD 2230 - 2330 1.00 CASING P 19,858.00 RUNPRD RIG UP TO RUN 4A/2-,12.6 LB/FT, 13CR83 VAMTOP PRODUCTION LINER - MAKE UP HANDLING TOOLS - MAKE UP XO TO FOSV - MOBILIZE CASING TONGS TO RIG FLOOR - RIG UP DOYON CASING 2330 - 0000 0.50 CASING P 19,858.00 RUNPRD SERVICEAND INSPECT PIPE CATANDTOP DRIVE _ 4/17/2019 0000 - 0430 4.50 CASING P _ 19,858.00 RUNPRD RUN 4-1/2", 12.6 LB/FT, 13CR85, VAMTOP PRODUCTION LINER TO 4060' MD - CHECK FLOATS: HOLDING - BAKERLOK SHOE TRACK CONNECTIONS - USE JET LUBE SEAL GUARD PIPE DOPE ON ALL VAMTOP CONNECTIONS - TORQUE VAMTOP CONNECTIONS 704440 FT -LBS - FILL LINER ON THE FLY, TOP OFF EVERY 10 JTS - PU 72 KBLS, SO 70 KLBS - MONITOR WITH HOLE FILL AND TRIP TANK: . GOOD DISPLACEMENT -MUD WEIGHT IN/OUT =9.5 PPG CENTRALIZATION (4.5" x 5.88" VOLANT HYDROFORM): - RUN 1 CENTRALIZER LOCKED DOWN 5' FROM THE PIN ON JTA - RUN 1 CENTRALIZER LOCKED DOWN MID -JT ON JTB - RUN 2 CENTRALIZERS: 1 FREE FLOATING BETWEEN STOP RINGSAT4' AND 10' FROM - PIN AND 1 LOCKED DOWN 13' FROM BOX ON JT C AND ON JTS 1-90 - TOTAL CENTRALIZERS RUN = 183 - TOTAL STOP RINGS RUN = 366 04:30 - 05:30 1.00 CASING P 19,858.00 RUNPRD MAKE UP WEATHERFORD LINER HANGER/ LINER TOP PACKER ASSEMBLY PER WEATHERFORD REPRESENTATIVE - VERIFY SHEAR SCREWS PU 75 KLBS, SO 70 KLBS 05:30 - 06:00 0.50 CASING P 19,858.00 RUNPRD CIRCULATE IX LINER VOLUME - 5 BPM, 175 PSI MUD WEIGHT IN/OUT = 9.5 PPG 06:00 - 13.30 7.50 CASING P 19,858.00 RUNPRD CONTINUE TO RUN IN THE HOLE WITH 4-1/2" PRODUCTION LINER ON 4" AND 5" DRILL PIPE STANDS FROM 4060' MD TO 15397' MD, AT THE 7" LINER SHOE - RUN IN THE HOLE AT 90 FT/MIN - FILL PIPE EVERY 20 STANDS - MONITOR WITH HOLE FILL AND TRIP TANK: GOOD DISPLACEMENT - MUD WEIGHT IN/OUT = 9.5 PPG Printed 5/9/2019 8:51.07AM "All dephts reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name. NK -08 AFE No Event Type: COM -ONSHORE (CON) Start Date: 4/16/2019 End Date: 4/22/2019 X3 -0199F -C (3,071,363.001 Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud DaterTme: 7/14/1994 12:00 OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Page 2 of 10 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To His Task Code NET Total Depth Phase Description of Operations (hr) (usft) 13:30 - 14:30 1.00 CASING P 19,858.00 RUNPRD CIRCULATE 1.5X LINER AND DRILL PIPE 1430 - 1830 4.00 CASING P 1830 - 1900 0.50 CASING P 19:00 - 23:30 4.50 CASING P 23:30 - 00'.00 0.50 CASING P Pnnted 5/9/2019 8'51 07AM "All debris reported in Drillers Depths" VOLUME AT THE 7" LINER SHOE - STAGE UP PUMPS TO 5 BPM, 840 PSI - FLOW CHECK WELL FOR 10 MIN PRIOR TO RUNNING IN OPEN HOLE: STATIC 19,858.00 RUNPRD CONTINUE TO RUN IN THE HOLE WITH 4-1/2" PRODUCTION LINER ON 5" DRILL PIPE STANDS FROM 1593T MD TO 19846' MD - RUN IN THE HOLEAT 50-70 FT/MIN '- FILL PIPE EVERY 10 STANDS - PU 270 KLBS, SO 154 KLBS AT 19846' MD - MONITOR WITH HOLE FILL AND TRIP TANK. GOOD DISPLACEMENT - MUD WEIGHT IN/OUT = 9.5 PPG 19,858.00 RUNPRD MAKE UP CEMENT HEADAND WASH DOWN TO TO AT 15858' MD - MAKE UP CEMENT HEAD AND SINGLE i- WASH DOWN AT 2 BPM AND TAG BOTTOM AT 19858' MD WITH 5K LBS - PICK UP OFF BOTTOM 2' TO 15856' MD AND _ _ MARK PIPE 19,858.00 RUNPRD STAGE UPTO CEMENTING RATE IN 1 BPM INCREMENTS FOR A FINAL CEMENTING RATE OF 5 BPM - @ 2 BPM, 680 PSI - @ 3 BPM, 830 PSI -@4 BPM, 1045 PSI - @ 5 BPM, 1300 PSI - CONDITION MUD TO 9.5 PPG IN/OUT AND 16 YP - INITIAL PRESSURE AT CEMENTING RATE: 1300 PSI - FINAL PRESSURE AT CEMENTING RATE AFTER HOLE CONDITIONED: 1240 PSI - CIRCULATE A TOTAL OF 2X BOTTOMS UP - RECIPROCATED PIPE BAT SURFACE AT 350 FT/MIN 19,858.00 RUNPRD PRESSURE TEST CEMENT LINES - HOLD PJSM WITH CEMENT CREW FOR CEMENTING PRODUCTION LINER - REVIEW WORKING WITH PRESSURE CROSSCHECK CHECKLIST - FLUID PACK LINES - PRESSURE TESTALL LINES TO 4500 PSI Pnnted 5/9/2019 8'51 07AM "All debris reported in Drillers Depths" North America - ALASKA- BP Page 3 of 10 Operation Summary Report Common Well Name'. NK -08 AFE No Event Type: COM -ONSHORE (CON) Start Date. 4/16/2019 End Cate: 4/22/2019 X3 -0199F -C: (3,071,363.00 ) Project: Niakuk Site: NK - 220 BBLS DISPLACED AT 5 BPM Rig Name/No.: PARKER 272 Spud Dater/Time: 7/14/1994 12:00 ROAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. S DISPLACEMENT AT 5 BPM - DID NOT OBSERVE LATCH UP BPUOI. USA00001319 Active datum. ACTUAL KB P272 @67.45usft (above Mean Sea Level) FOR PLUG BUMP Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usff) _ 4/18/2019 00:00 - 02:00 2.00 CASING P 19,858.00 RUNPRD CEMENT 4-1/2" PRODUCTION LINER AS FOLLOWS: - PUMP 30 BBLS OF 12.0 PPG MUDPUSH II SPACER AT 5 BPM, 1200 PSI - CEMENT WETAT 00:06 HRS - PUMP 96 BBLS (528 SKS) (30% OH EXCESS VOLUME) OF 15.8 PPG CLASS G CEMENT (1.17 CU.FT/SK) AT 5 BPM - RECIPROCATED PIPE 15 FTAT SURFACE WHILE PUMPING CEMENT - CLOSE LOWER TI W VALVE AND WASH UP ON TOP OF DART WITH 10 BBLS 9.5 PPG QUIKDRIL-N PERFORM DISPLACEMENT WITH RIG PUMPS - DISPLACE CEMENT WITH 284.2 BBLS OF 9.5 Printed 5/9x2019 85:07AM **All dephts reported in Drillers Depths" PPG QUIKDRIL-N - 220 BBLS DISPLACED AT 5 BPM - 64 BBLS DISPLACED AT 3 BPM - CAUGHT CEMENT AT 65 BBLS INTO S DISPLACEMENT AT 5 BPM - DID NOT OBSERVE LATCH UP L - REDUCED RATE TO 3 BPM FOR LATCH AND FOR PLUG BUMP Printed 5/9x2019 85:07AM **All dephts reported in Drillers Depths" - FINAL CIRCULATING PRESSURE: 1600 PSI - INCREASE PRESSURE TO 2100 PSI AND � ,, �rnp HOLD FR 5 MIN b\'7�`7 HF LEEDO FFP SURE AND CHECK F E �+ -TOTAL DISPLACEMENT VOLUME : 284.2 BBLS (MEASURED BY STROKES WITH 700% PUMP EFFICIENCY) - CEMENT IN PLACE AT 01:40 HRS -LOSTATOTALOF 21 BBLS DURING JOB.9 BBLS AFTER CEMENT ENTERED OPEN HOLE 02:00 - 02:30 0.50 CASING P 19,858.00 RUNPRD SET LINER HANGER / LINER TOP PACKER PER WEATHERFORD REPRESENTATIVE - PRESSURE UP TO 2900 PSI TO SET LINER HANGER AND SET DOWN 60 KLBS TO CONFIRM SET - PRESSURE UP TO 4300 PSI TO RELEASE FROM LINER - PICK UP TO EXPOSE DOG SUBAND SET DOWN ON LINER TOP WITH 50 KLBS AND 20 RPM - PRESSURE UP TO 1500 PSI AND PICK UP TO REMOVE RS PACK -OFF FROM LINER 02:30 - 0330 1.00 CASING P 19,858.00 RUNPRD CIRCULATE OUT EXCESS CEMENT FROM LINER TOP - 16 BPM, 3900 PSI ICP, 3300 PSI FCP - PUMP NUT PLUG SWEEP SURFACE TO SURFACE - MUD WEIGHT IN/OUT = 9.5 PPG -25 BBLS OF EXCESS CEMENT BACK TO SURFACE AT BOTTOMS UP 0330 - 0400 0.50 CASING P 19,858.00 RUNPRD BLOW DOWN CIRCULATING LINES AND RIG DOWN CEMENT HEAD 0400 - 0500 1.00 CASING P 19,858.00 RUNPRD DISPLACE WELL FROM 9.5 PPG QUIKDRIL-N TO 9.5 PPG BRINE - 15 BPM, 3000 PSI - RECIPROCATE PIPE 68' - MONITOR WELL FOR 10 MIN: STATIC Printed 5/9x2019 85:07AM **All dephts reported in Drillers Depths" Common Well Name. NK -08 North America - ALASKA- BP Operation Summary Report AFE No End Date: 4/22/2019 X3 -0199F -C:(3,071,363.00) EventType: GOM-ONSHORE (CON) Stan Uate. 4/16/2U19 Project: Niakuk Site: NK i Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM Rig Release: 4122/2019 Page 4 of 10 Rig Contractor: PARKER DRILLING CO. SPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ 0500 - 1330 8.50 CASING P 19,858.00 RUNPRD PULLOUTOF THE HOLE WITH LINER RUNNING TOOL FROM 15760' MD - PU 270 KLBS, SO 140 KLBS AT 15760' MD - MONITOR WELL WITH HOLE FILLAND TRIP TANK: HOLE TAKING PROPER FILL - BRINE WEIGHT IN/OUT = 9.5 PPG 'LAY DOWN BUMPER SUB AND RUNNING TOOL _ 1330 - 1430 1.00 PERFOB P 19,858.00 OTHCMP ,CLEAN AND CLEAR RIG FLOOR BRING PERFORATING GUNS INTO PIPE SHED WBS:OTHCMP 14:30 - 15'.00 0.50 PERFOB P 19,858.00 OTHCMP RIG UP TO RUN 2-7/8" PERFORATING GUNS AND 2-7/8" PAC PIPE 1500 - 21'.00 6.00 PERFOB P 19,858.00 OTHCMP RUN IN THE HOLE WITH 2-7/8" PERFORATING GUNSAND 2-718" PAC PIPE TO 3951'MD - PICK UP PERFORATING GUNS PER HALLIBURTON TCP TO 231 T MD - PICK UP 2-7/8" PAC PIPE FROM 2313' MD TO 3951'MD - PU 60 KBLS, SO 60 KLBS AT 3951' MD - MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD DISPLACEMENT - BRINE WEIGHT IN/OUT = 9.5 PPG 21'.00 - 21'.30 0.50 PERFOB P 19,858.00 OTHCMP RIG DOWN 2-7/8" HANDLING EQUIPMENT / 21'.30 - 00:00 2.50 PERFOB P 19,858.00 OTHCMP CONTINUE TO RUN 2-718" PERFORATING GUNS IN THE HOLE ON STANDS OF 4" DRILL PIPE - FROM 3951' MD TO 10672' MD - PU 137 KLBS, SO 93 KLBS AT 10672' MD - MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD DISPLACEMENT - BRINE WEIGHT I WOUT = 9.5 PPG 4/19/2019 00:00 - 04:30 4.50 PERFOB P 19,858.00 OTHCMP CONTINUE TO RUN 2-7/8" PERFORATING GUNS IN THE HOLE ON STANDS OF 5" DRILL PIPE - FROM 10672' MD TO 19500' MD - PU 285 KLBS, SO 146 KLBS AT 19500' MD - MONITOR WELL WITH HOLE FILLAND TRIP TANK. GOOD DISPLACEMENT - BRINE WEIGHT IN/OUT = 9.5 PPG 04:30 - 0500 0.50 PERFOB P 19,858.00 GOOD TEST - 10.5 BBLS TO PRESSURE UP, 10.5 BBLS BLED BACK Printed 5/9/2019 6 51:07AM **All dephts reported in Drillers Depths" North America -ALASKA - BP Operation Summary Report Page 5 of 10 Common Well Name: NK -08 AFE No Event Type. COM- ONSHORE (CON) Start Date: 4/16/2019 End Date: 4/22/2019 X3 -0199F -C'. (3,071,363.00 ) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (ui 0500 - 0600 1.00 PERFOB P 19,858.00 OTHCMP PERFORATE 4-1/2" PRODUCTION LINER PER HALLIBURTON TCP REPRESENTATIVE - PRE JOB SAFETY MEETING WITH RIG CREW AND HALLIBURTON TCP -PERFORM PRESSURE SEQUENCE PER TCP SPECIALIST - OBSERVE POSITIVE INDICATION OF GUNS FIRING - INTIAL LOSS OF 5 BELS AFTER GUNS FIRED PERFORATING INTERVALS: - 17220' MD TO 17420' MD - 200' i- 17570'MD TO 17910'MD - 340' - 18000' MD TO 18500' MD - 500' - 18570' MD TO 19130' MD - 560' - 19180' MD TO 19500' MD - 320' TOTAL PERFORATED FOOTAGE = 1920' O6: DO - 0730 1.50 PERFOB P 19,858.00 OTHCMP PULL OUT OF THE HOLE WITH PERFORATING GUNS ON ELEVATORS TOABOVE TOP SHOT - FROM 19500' MD TO 17190' MD - PU 280 KLBS, SO 135 KLBS -BRINE WEIGHT INi=9.5 PPG 0730 - 09:30 2.00 PERFOB P 19,858.00 OTHCMP CIRCULATE IX BOTTOMS UPAT 9100' MD - MONITOR WELL FOR 10 MIN: STATIC LOSS RATE -3-5 BPH - 300 GPM, 2800 PSI - DYNAMIC LOSS RATE WHILE CIRCULATING -2 BPH - BRINE WEIGHT IN/OUT =9.5 PPG 0930 - 1600 6.50 PERFOB P 19,858.00 OTHCMP PULL OUT OF THE HOLE ON ELEVATORS WITH 2-7/8" PERF GUNS, STANDING BACK 5" AND 4" DRILL PIPE, FROM 17190' MD 70 3951' MD - MONITOR WELL FOR 10 MIN PRIOR TO PULLING: <3 BPH LOSS RATE - PU 260 KLBS, SO 135 KLBS AT 17190' MD - PULLAT 100 FT/MIN FROM 17190' MO TO 15500' MD - PULLAT 150 FT/MIN FROM 15500' MD TO 14500' MD - PULLAT 265 FT/MIN FROM 14500' MD TO 3951' MD - MONITOR WELL WITH TRIP TANKAND HOLE FILL: HOLE TAKING PROPER FILL - BRINE WEIGHT IN/OUT = 8.5 PPG Printed 5/9/2019 8:51:07AM '*All dephts reported in Drillers Depths" North America - ALASKA - BP Page 6 or 10 Operation Summary Report Common Well Name. NK -08 AFE No Event Type: COM- ONSHORE (CON) Start Date: 4/16/2019 End Date: 4/22/2019 X3 -0199F -C: (3,071,363 D0 ) Project: Niakuk Site: NK Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Hm Task Code NPT Total Depth Phase (hr) (usft) BPUOI: USA00001319 Description of Operations 16:00 - 22:00 6.00 . PERFOB P 19,858.00 OTHCMP PULLOUT OF THE HOLE AND LAY DOWN 2-7/8" PAC DRILL PIPE AND 2-7/8" PERF GUNS Printed 5/9/2019 8:51 07AM "All dephts reported in Drillers Depths— - PRE JOB SAFETY MEETING WITH RIG CREW, DOYON CASING AND HALLIBURTON TCP - MONITOR WELL FOR 10 MIN PRIOR TO PULLING NON-SHEARABLES THROUGH THE STACK: STATIC - PULLAND LAY DOWN 52 JTS OF 2-7/8" PAC DRILL PIPE TO PIPE SHED - PULLAND LAY DOWN FIRED 2-7/8" PERFORATING GUNS AND BLANKS TO PIPE SHED - MONITOR WELL WITH HOLE FILLAND TRIP TANK: HOLE TAKING PROPER FILL - BRINE WEIGHT IN/OUT = 9.5 PPG _ - ALL GUNS FIRED 2200 - 2230 0.50 RUNCOM P 19,858.00 RUNCMP CLEAN AND CLEAR RIG FLOOR 2230 - 2330 1.00 RUNCOM P 19,858.00 RUNCMP CUT AND SLIP 75'OF DRILL LINE - HANG OFF BLOCKS - CUT 9 WRAPS (75') OF DRILL LINE -SLIP ON NEW LINE AND TORQUE DEAD MAN _ -R_E-CALIBRATE BLOCKS _ 2330 - 0000 0.50 RUNCOM P 19,858.00 RUNCMP RIG UP TO RUN 4-1/2", 12.6 LB/FT VAMTOP COMPLETION - RIG UP SIDE DOOR ELEVATORS __'_ 11 -RIG UP TORQUE TURN EQUIPMENT 4/20/2019 00:00 - 01:30 1.50 RUNCOM P 19,858.00 RUNCMP CONTINUE TO RIG UPTO RUN 4-1/2".12.6 LB/FT VAMTOP COMPLETION -PULLAND LAY DOWN WEAR RING - MAKE UP XO TO FOSV - INSTALL 40'MOUSEHOLE SIMOPS: - REMOVE SPENT GUNS FROM PIPE SHED - ORGANIZE COMPLETION JEWELRY AND PREP PIPE SHED TO RUN COMPLETION 01:30 - 1700 15.50 RUNCOM P 19,858.00 RUNCMP RUN 4-1/2", 12.6 LB/FT, 13CR85 VAMTOP COMPLETION TO 13699' MD - BAKERLOK WLEG ASSEMBLY, JOINT, XN NIPPLE ASSEMBLY AND HALLIBURTON TNT PACKER ASSEMBLY - USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE 4-1/2" VAMTOP CONNECTIONS TO 4440 FT -LBS - RUN IN THE HOLE AT 90 FT/MIN - PU 150 KLBS, SO 92 KLBS AT 13699' MD -MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD DISPLACEMENT - BRINE WEIGHT IN/OUT = 9.5 PPG 1700 - 20 00 3.00 RUNCOM P 19,858.00 RUNCMP MAKE UP SCHLUMBERGER SSSVAND CONTROL LINE - MOBILIZE CONTROL LINE, SPOOLER AND CLAMPS TO RIG FLOOR - RIG UP CONTROL LINE SPOOLER AND SHEAVE - MAKE UP CONTROL LINE TO SSSV AND PRESSURE TEST TO 5000 PSI: GOOD TEST SIMOPS: Printed 5/9/2019 8:51 07AM "All dephts reported in Drillers Depths— Printed 519/2019 8:51:07AM **All dephts reported in Drillers Depths" North America - ALASKA - BP Page 7 of 10 Operation Summary Report Common Well Name: NK-OB AFE No Event Type. COM- ONSHORE (CON) Start Date'. 4/162019 End Date: 4/22/2019 X3-0199F-C: (3.071,363 00 ) Project: Niakuk Site NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) 2000 - 0000 4.00 RUNCOM P 19,858.00 RUNCMP CONTINUE TO RUN 4-12" COMPLETION WITH SSSV AND SINGLE CONTROL LINE FROM 13669' MD TO 15770' MD - USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE 4-1/2" VAMTOP CONNECTIONS TO 14440 FT-LBS - RUN IN THE HOLE AT 90 FT/MIN - PU 180 KLBS, 50108 KLBS AT 15765' MD - MONITOR WELL WITH HOLE FILLAND TRIP TANK: GOOD DISPLACEMENT - BRINE WEIGHT M/OUT = 9.5 PPG OBSERVE 2 KLBSADDITIONAL DRAG AT 15766' MD AND TAG NO-GO IN PBR WITH 5 KLBS AT 15777' MD. TAGGED IN SAME SPOT 3X. SPACE-OUT WITH NO ADDED PUPS TO 15770' MD (4.5' INTO PBR) MAKE UP TUBING HANGER AND TERMINATE CONTROL LINE IN TUBING HANGER. MAKE 'UP COUPLING AND PRESSURE TEST CONTROL LINE TO 5000 PSI FOR 15 MIN. 4/21/2019 00:00 - 01:30 1.50 RUNCOM P 19,858.00 OTHCMP . CONTINUE TO LAND UPPER COMPLETION. --CONTINUE TO PRESSURE TEST CONTROL LINE TO 5000 PSI FOR 15 MIN: GOOD TEST - RUN IN THE HOLEAND LAND TUBING HANGER IN TUBING SPOOL PER FMC REPRESENTATIVE - RUN IN LOCK DOWN SCREWS 01.30 - 05'.30 4.00 RUNCOM P 19,858.00 OTHCMP RIG UP AND REVERSE IN 120°F HEATEO 9.5 PPG FILTERED BRINE AND CORROSION INHIBITED BRINE - STAGE UP PUMPS TO BPM (MAX RATE), 750 PSI - 244 BBLS OF CLEAN 9.5 PPG BRINE - 320 BBLS OF CORROSION INHIBITED 9.5 PPG BRINE - 310 BBLS OF CLEAN BRINE (OVER DISPLACE BY 5 BELS) - LINE UP AND PUMP 5 BBLS DOWN THE TUBING TO PUT FLUIDS BACK IN PLACE AND FLUSH RHC-M SEAT. SIMOPS: - LAV DOWN DRILL PIPE WITH OFF -LINE STAND BUILDING EQUIPMENT - RIG DOWN TUBING RUNNING AND HANDLING EQUIPMENT - CLEAN RIG FLOOR AND PIPE SHED. Printed 519/2019 8:51:07AM **All dephts reported in Drillers Depths" Common Well Name. NK -08 Event Type: COM- ONSHORE (CON) North America - ALASKA - BP Page 8.f 10 1 Operation Summary Report AFE No Start Date. 4/16/2019 End Date: 4122/2019 X3-0199 (3,071,363.00 ) Project: Niakuk Site: NK Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12:00:OOAM Rig Release: 4/22/2019 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From -To Him Task Code (hr) 0530 - 0830 3.00 RUNCOM P NPT Total Depth Phase Description of Operations (usfi 19,858.00 OTHCMP SET AND TEST 7"x4-1/2" HALL BURTON TNT _ PACKER - DROP BALL AND ROD AND ALLOW TO FALL TO RHC -M PLUG IN XN NIPPLE BELOW PACKER - PRESSURE UP ON TUBING TO 4200 PSI AND SETPACKER PRESSURE TEST TUBING TO 4000 PSI FOR 30 CHARTED MIN - HOLD PRESSURE AFTER SETTING PACKER - LOST 75 PSI IN THE FIRST 15 MIN, 25 PSI IN THE SECOND 15 MIN - TEST MEETS TESTING CRITERIA PER BP PRACTICE 100218 PRESSURE TEST 7" x 4-112" IA AND PACKER TO 4000 PSI FOR 30 CHARTED MIN - BLEED TUBING PRESSURE TO 2500 PSI AND HOLD - PRESSURE UP ON TATO 4180 PSI i- LOST 40 PSI IN FIRST 15 MIN, 20 PSI IN THE SECOND 15 MIN -TEST MEETS TESTING CRITERIA PER BP PRACTICE 100218 BLEED OFF IAAND TUBING i- TOTAL VOLUME PUMPED = 12.5 BBLS, TOTAL BLED OFF = 12.5 BBLS SEND TEST TO WSUP AND RECEIVE AUTHORIZATION TO PROCEED. SHEAR DCR VALVE IN GLM #7 AND VERIFY CIRCULATION - Di VALVE SHEARED AT 2500 PSI - 2 BPM, 300 PSI SIMOPS: - LAY DOWN DRILL PIPE WITH OFF-LINE _STAND BUILDING EQUIPMENT _ 08:30 - 10:30 2.00 RUNCOM P 19,858.00 RUNCMP REVERSE IN DIESEL FREEZE PROTECT TO 100' MD AND ALLOW TO U -TUBE - REVERSE IN 20 BBLS OF 6.8 PPG DIESEL FREEZE PROTECT -ALLOW WELL TO U -TUBE FOR i HR 15 MIN. SIMOPS: - LAY DOWN DRILL PIPE WITH OFF-LINE STAND BUILDING EQUIPMENT Printed 5/9/2019 8:51:07AM **Ali dephts reported in Drillers Depths'• Common Well Name. NK -08 Event Type: COM- ONSHORE (CON) Project: Niakuk North America - ALASKA- BP Operation Summary Report Start Date: 4/16/2019 End Date: 4/22/2019 Site: NK AFE No (3,071,363.00 ) Rig Release: 4/22/2019 Page 9 of 10 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From -To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) 1030 - 1230 2.00 WHSUR P 19,658.00 WHDTRE INSTALLAND TEST TWC FROM BELOW - BACK OUT AND PULL LANDING JOINT - INSTALL TWC WITH DRY -ROD PER FMC REPRESENTATIVE - RIG UPAND PRESSURE TEST TWC FROM BELOW 4000 PSI FOR 5 MIN: GOOD TEST - RIG DOWN TEST EQUIPMENT - BLEED OFFAND TERMINATE CONTROL LINE AT SURFACE SIMOPS: '- LAY DOWN DRILL PIPE WITH OFF-LINE STAND BUILDING EQUIPMENT WBS:RIGD 12 30 - 1330 1.00 WHSUR P 19,858.00 WHDTRE BLOW DOWN DIESEL FREEZE PROTECT LINES 'RUN IN WITH LANDING JOINT AND BLOW OUT STACK BREAKDOWN LANDING JOINTAND LAY 'DOWN TO PIPE SHED 1330 - 1430 1.00 BOPSUR P 19,858.00 WHDTRE 'PREP RIG TO NIPPLE DOWN BOP STACK I - CLEAN OUT DRIP PANS '-BLEED OFF ACCUMULATOR - PULLAND LAY DOWN LOW PRESSURE RISER AND FLOW BOX - REMOVE CHOKE HOSE SIMOPS: - LAY DOWN DRILL PIPE WITH OFF-LINE STAND BUILDING EQUIPMENT 1430 - 1730 3.00 BOPSUR P 19,858.00 WHDTRE CHANGE OUTANNULAR ELEMENT - PULLANNULAR CAPAND MOVE BOP STACK TO STUMP. - PULL OLD ANNULAR ELEMENT AND INSPECTANNULAR BODY -INSTALLNEW ELEMENTAND SEALS - MOVE BOP STACK BACK TO WELL CENTER AND RE -INSTALL ANNULAR CAP SIMOPS: - LAY DOWN DRILL PIPE WITH OFF-LINE _ _STAND BUILDING EQUIPMENT 17:30 - 19:30 2.00 BOPSUR P 19,858.00 WHDTRE NIPPLE DOWN BOP STACKAND HIGH PRESSURE RISERS - RACK BOP STACK BACK ON STUMP AND SECURE - NIPPLE DOWN HIGH PRESSURE RISERS AND LAY DOWN TO PIPE SHED SIMOPS: - LAY DOWN DRILL PIPE WITH OFF-LINE STAND BUILDING EQUIPMENT Printed 5/9/2019 8 51 07AM **All dephts reported in Drillers Depths"' North America - ALASKA - BP Page 10 of 10 Operation Summary Report Common Well Name: NK -08 AFE No Event Type: COM- ONSHORE (CON) Start Date: 4/16/2019 End Date: 4/22/2019 X3 -0199F -C: (3,071,363.00 ) Project: Niakuk Site: NK {I Rig Name/No.: PARKER 272 Spud Date/Time: 7/14/1994 12'.00:00AM Rig Release: 4/22/2019 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations . (hr) (usft) 19:30 - 22:00 2.50 WHSUR P 19,858.00 WHDTRE NIPPLE UP ADAPTER FLANGE AND TREE - CLEAN OFF HANGER - TERMINATE CONTROL LINE AND INSTALL IN WELLHEAD - NIPPLE UP ADAPTER FLANGE AND TREE - TORQUE ALL FLANGES SIMOPS: - LAY DOWN DRILL PIPE WITH OFF-LINE STAND BUILDING EQUIPMENT 22:00 - 23:00 1.00 WHSUR P 19,858.00 WHDTRE RIG UP AND PRESSURE TEST ADAPTER FLANGE / HANGER VOID TO 4500 PSI FOR 15 MIN: GOOD TEST - SEND TEST TO WSUP AND RECEIVE 'AUTHORIZATION TO PROCEED. SIMOPS: '- LAY DOWN DRILL PIPE WITH OFF-LINE _ STAND BUILDING EQUIPMENT 23:00 - 00:00 1.00 WHSUR P 19,858.00 WHDTRE PRESSURE TEST TREE 4500 PSI FOR 5 MIN, VISUAL LEAK TIGHT TEST '- FILLTREE WITH DIESELAND PRESSURE TEST TO 4500 PSI: GOOD TEST - SUCK OUT DIESEL FROM TREE - POUR 2 BOTTLES OF HEET IN TREE, ON TOP OF TWC SIMOPS: - LAY DOWN DRILL PIPE WITH OFF-LINE STAND BUILDING EQUIPMENT 4/22/2019 00:00 - 07:00 7.00 RIGD P 19.856.00 WHDTRE LAY DOWN STANDS OF 5" DRILL PIPE UTILIZING OFF-LINE STAND BUILDING EQUIPMENT SIMOPS: - INSTALL GAUGES AND VALVES ON TREE AND WELLHEAD PER FMC REPRESENTATIVE - BLEED DOWN OA TO < 50 PSI (NO FLUID) - SECURE WELL HEAD VALVESAND WELL HOUSE - RIG DOWN WELL HOUSE - GENERAL RIG DOWN OPERATIONS THROUGHOUT RIG ****RELEASE RIG 07:00 Pnmed 5/9/2019 8:51:07AM **All dephts reported in Drillers Depths— by North America - ALASKA - BP Niakuk NK NK -08 NK -08B 500292249102 Design: NK -08B Final Survey Report 24 April, 2019 �� by 'rte Company: North Amenca- ALASKA - BP Project: Niakuk Site: NK Well: NK -08 Wellbore: NK -08B Design: NK -08B BP Final Survey Report Local Co-ordinate Reference: Well NK -08 TVD Reference: ACTUAL KB P272 @ 87.45usft MD Reference: ACTUAL KB P272 @ 67.45usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project Niakuk, GPMA, NIAKUK Map System: Alaska NAD27 Stale Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27'OGP-Usa AK/ Alaska zone 4[26734'1586, Using geodetic scale factor Site NK, TR -12-15 Site Position: From: Map Position Uncertainty: 0.00 usft Well NK -08, NK -08 Well Position +N/ -S 0.00 usft +E/ -W 0.00 usft Position Uncertainty 0.00 usft Wellbore NK -08B Magnetics Model Name BGGM2018 Design NK -08B Audit Notes: Version: 1.0 Vertical Section: Northing: 5,981,257.790 usft Easting: 714,553.260 usft Slot Radius: 0.000 in Latitude: Longitude: Grid Convergence: Northing: 5,979,798.600 usft Latitude: Easting: 721,465.300 usft Longitude: Wellhead Elevation: 22.17 usft Ground Level: Sample Date Declination Dip Angle Field Strength (°) 1'1 (nT) 4/1/2019 17 07 81.00 57,435 Phase: Depth From (TVD) (usft) 4528 ACTUAL •N/ -S (usft) 000 Tie On Depth: +E/ -W (usft) 0 00 970665 Direction 1°1 45 00 70' 21'5.879 N 148° 15'27,984 W 1.64 70° 20'49,555 N 148° 12'7.308 W 19.77 usft 42412019 12: 4706PM Page 2 COMPASS 5000.1 Build 81D r ss BP Final Survey Report Company: North America - ALASKA - BP DLeg (usft) Local Coordinate Reference: (°I100usft) Project: Niakuk 0.00 721,465.297 0.37 TVD Reference: 0.03 Site: NK 0.02 721,465.439 0.27 MD Reference: 0.39 Well: NK -08 0.73 721,464.498 2.79 North Reference: 3.48 Wellbore: NK -08B 2.07 721,447.742 Survey Calculation Method: 721,436.268 Design: NK -08B 2.06 721,421.722 206 Database: 0.85 Survey Program Date 4/24/2019 0.94 721,367.528 1.70 721,345.346 From To 0.84 721,295.770 1.56 721,267.562 (usft) (usft) Survey (Wellbore) Tool Name Description 106.65 9,706.65 1 Gyrodata gyrocompassing m/ (NK -08) GYD-GC-MS Gyrodata gyrocompassing m/s 9,776.00 10,292.79 Survey#1 (NK -08B) BLIND Blind drilling 10,376.82 15,904.59 Survey #2 (NK -08B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 15,978.04 19,858.00 Survey #3 (NK -08B) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal Survey MD Inc Azi TVD TVDSS NIS EIW Northing (usft) V) V) (usft) (usft) (usft) (usft) (usft) 45.28 0.00 0.00 45.28 -22.17 0.00 0.00 5,979,798.600 106.65 0.23 0.52 106.65 39.20 0.12 0.00 5,979,798.723 206.65 0.25 6.05 206.65 139.20 0.54 0.03 5,979,799.141 306.65 0.26 9.40 306.65 239.20 0.98 0.09 5,979,799.584 406.65 0.53 8.14 406.65 339.20 1.66 0.19 5,979,800.268 506.65 0.92 3.96 506.64 439.19 2.92 - 0.31 5,979,801.530 606.65 1.63 356.97 60661 539.16 5.14 0.29 5,979;803.749 708.85 4.40 349.31 70646 639.01 10.33 -0.50 5,979,808.914 806.65 7.83 343.84 805.88 738.43 20.65 -3.11 5,979,819.147 906.65 9.72 338.25 904.71 837.26 35.03 -8.13 5,979,833.377 1,006.65 11.57 331.54 1,002.99 935.54 51.69 -16.04 5,979,849.794 1,106.65 13.50 328.23 1,100.60 1,033.15 70.43 -26.96 5,979,868.204 1,206.65 15.19 323.45 1,197.46 1,130.03 90.88 -40.91 5,979,888.232 1,306.65 16.04 323.14 1,293.79 1,226.34 112.46 -57.00 5,979,909.325 1,406.65 16.97 322.72 1,389.67 1,322.22 135.13 -74.13 5,979,931.474 1,506.65 18.48 320.17 1,484.92 1,417.47 158.91 -93.12 5,979,954.686 1,606.65 20.17 319.07 1,579.28 1,511.83 184.11 -114.57 5,979,979.239 1,706.65 21.00 318.75 1,672.90 1,605.45 210.61 -137.68 5,980,005.040 1,806.65 22.30 316.39 1,765.84 1,698.39 237.82 -162.58 5,980,031,502 1,906.65 24.42 316.29 1,857.64 1,790.19 266.50 -189.95 5,980,059.362 4/24)2019 12:47.06PM Page 3 Well NK -08 ACTUAL KB P272 @ 67.45usft ACTUAL KB P272 @ 67.45usft True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Easting DLeg (usft) (°I100usft) 721,465.300 0.00 721,465.297 0.37 721,465.310 0.03 721,465.357 0.02 721,465.439 0.27 721,465.523 0.39 721,465.438 0.73 721,464.498 2.79 721,461.566 3.48 721,456.139 2.07 721,447.742 2.22 721,436.268 2.06 721,421.722 206 721,405.002 0.85 721,387.213 0.94 721,367.528 1.70 721,345.346 1.73 721,321.464 0.84 721,295.770 1.56 721,267.562 2.12 V. Sec (usft) 0.00 009 0.40 0.75 1 31 229 3.84 6.96 1241 19.02 25.21 30.74 35.34 39.22 43.13 4652 49.17 51.57 53.20 54.13 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Well NK -08 Project: Niakuk ND Reference: ACTUAL KB P272 @ 67.45usft Site: NK MD Reference: ACTUAL KB P272 @ 67.45usft Well: NK -08 North Reference: True Wellbore: NK -08B Survey Calculation Method: Minimum Curvature Design: NK -08B Database: EDM RSK- Alaska PROD -ANCPI Survey MD Inc An TVD NDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 2,00665 29.42 319.09 1,946.78 1,879.33 300.03 -220.34 5,980,091.974 721,236.198 5.16 56.35 2,106.65 33.16 315.38 2,032.23 1,964.78 338.07 -255.65 5,980,128.957 721,199.781 4.21 5828 2,206.65 36.84 312.64 2,114.13 2,046.68 377.86 -296.93 5,980,167.509 721,157.345 4.00 57.23 2,306.65 37.14 312.47 2,194.01 2,126.56 418.56 -341.25 5,980,206.870 721,111.842 0.32 54.66 2,406.65 37.69 314.99 2,273.44 2,205.99 460.55 -385.14 5,980,247.551 721,066.732 1.63 53.32 2,506.65 39.54 316.50 2,351.57 2,284.12 505.26 -428.68 5,980,290.950 721,021.897 2.08 54.15 2,606.65 43.44 317.00 2,426.46 2,359.01 553.51 -474.06 5,980,337.837 720,975.117 3.91 56.18 2,706.65 45.25 316.87 2,497.98 2,430.53 604.57 -521.78 5,980,387465 720,925.904 1.81 58.54 2,806.65 45.86 316.67 2,568.00 2,500.55 656.59 -570.68 5,980,438.012 720,875.492 0.63 60.75 2,906.65 49.44 315.67 2,635.35 2,567.90 709.88 -621.87 5,980,489.766 720,822.758 3.66 62.24 3,006.65 51.06 315.79 2,699.30 2,631.85 764.93 -675.53 5,980,543.206 720,767.491 1.62 63.22 3,106.65 50.97 317.18 2,762.21 2,694.76 821.30 -729.05 5,980,597.964 720,712.332 1.08 65.23 3,206.85 52.94 318.06 2,823.83 2,756.38 879.48 -782.12 5,980,654.544 720,657.565 2.09 68.84 3,306.65 54.23 317.55 2,883.20 2,815.75 931st -636.18 5,980,712.534 720,601.778 1.35 72.77 3,406.65 53.22 319.02 2,942.36 2,874.91 999.26 -889.82 5,980,771.091 720,546.379 1.56 77.39 3,506.65 54.12 319.66 3,001.61 2,934.16 1,060.38 -942.31 5,980,830.825 720,492.109 1.04 83.49 3,606.65 55.54 320.12 3,059.21 2,991.76 1,122.90 -994.97 5,980,891.558 720,437.627 1.47 90.46 3,706.65 59.42 317.08 3,112.96 3,045.51 1,186.09 -1,050.75 5,980,953.073 720,380.009 4.65 95.70 3,806.65 60.04 316.46 3,163.37 3,095.92 1,249.02 -1,109.90 5,981,014.220 720,319.023 0.82 98.37 3,906.65 59.58 317.00 3,213.66 3,146.21 1,311.95 -1,169.15 5,981,075.375 720,257.945 0.66 100.98 4,006.65 60.14 316.72 3,263.87 3,196.42 1,375.06 -1,228.28 5,981,136.700 720,196.975 0.61 103.78 4,108.65 60.36 317.94 3,313.49 3,248.04 1,438.89 -1,287.13 5,981,198.765 720,136.275 1.08 107.31 4,206.65 60.49 319.40 3,362.85 3,295.40 1,504.20 -1,344.56 5,981,262.343 720,076.941 1.28 112.88 4,306.65 61.81 320.15 3,411.10 3,343.65 1,571.07 -1,401.12 5,981,327.515 720,018.433 1.47 120.17 4,406.65 63.40 319.61 3,457.11 3,389.66 1,638.96 -1,458.33 5,981,393.681 719,9%241 1.66 127.72 4,506.65 63.83 320.16 3,501.55 3,434.10 1,707.47 -1,516.05 5,981,460.451 719,899.526 0.65 135.35 4,606.65 62.56 318.82 3,546.65 3,479.20 1,775.33 -1,574.02 5,981,526.566 719,839.578 1.74 142.35 4242019 12.47.06PM Page 4 COMPASS 5000.1 Build 81D BP by Final Survey Report Company: North Amenca-ALASKA -6P Local Co-ordinate Reference: Well NK -08 Project: Niakuk ND Reference: ACTUAL KB P272 @ 67.45usft Site: NK MD Reference: ACTUAL KB P272 @ 67.45usft well NK -08 North Reference: True Wellbore: NK -08B Survey Calculation Method: Minimum Curvature Design: NK -088 Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) PI (') (usft) (usft) (usft) (usft) (usft) (usft) ('1100usft) (usft) 4,706.65 61.68 320.94 3,593.42 3,525.97 1,842.91 -1,630.98 5,981,592.433 719,780.649 2.07 149.86 4,806.65 59.43 317.72 3,642.58 3,575.13 1,908.96 -1,687.70 5,981,656.776 719,722.008 3.59 156.46 4,906.65 58.84 316.11 3,693.89 3,626.44 1,971.65 -1,746.33 5,981,717.704 719,661.555 1.50 159.33 5,006.65 58.80 315.75 3,745.66 3,678.21 2,033.12 -1,805.83 5,981,777.386 719,600.261 0.31 160.72 5,106.65 59.15 316.30 3,797.20 3,729.75 2,094.79 -1,865.33 5,981,837.267 719,538.967 0.59 162.25 5,206.65 59.49 315.90 3,848.22 3,780.77 2,156.76 -1,924.97 5,981,897.444 719,477.530 0.48 163.90 5,306.65 59.60 316.22 3,898.91 3,831,46 2,218.83 -1,984.78 5,981,957.719 719,415.908 0.30 165.50 5,406.65 59.98 316.18 3,949.23 3,881.78 2,281.21 -2,044.60 5,982,018.295 719,354.280 0.38 167.31 5,506.65 58.88 315.95 3,999.33 3,931.88 2,343.53 -2,104.64 5,982,078.811 719,292.422 0.22 168.92 5,606.65 60.03 315.66 4,049.40 3,981.95 2,405.59 -2,164.99 5,982,139.062 719,230.273 0.29 170.13 5,706.65 60.53 315.73 4,098.98 4,031.53 2,467.74 -2,225.65 5,982,199.389 719,167.806 0.50 171.19 5,806.65 60.94 316.21 4,147.86 4,080.41 2,530.46 -2,286.28 5,982,260.288 719,105.351 0.59 172.66 5,906.65 60.83 316.34 4,196.52 4,129.07 2,593.60 -2,346.66 5,982,321.609 719,043.128 0.16 174.61 6,006.65 61.05 316.31 4,245.09 4,177.64 2,658.82 -2,407.03 5,982,383.017 718,980.926 0.22 176.63 6,106.65 60.50 317.63 4,293.92 4,226.47 2,720.61 -2,466.58 5,982,445.017 718,919.517 1.28 179.63 6,206.65 60.10 317.00 4,34346 4,276.01 2,784.46 -2,525.47 5,982,507.098 718,858.770 0.68 183.14 6,306.65 60.10 317.09 4,393.31 4,325.86 2,847.91 -2,584.54 5,982,568.770 718,797.851 0.08 186.23 6,406.65 59.93 316.88 4,443.29 4,375.84 2,911.24 -2,643.63 5,982,630.324 718,736.920 0.25 189.23 6,506.65 59.73 316.77 4,493.55 4,426.10 2,974.29 -2,702.78 5,982,691.594 718,675.932 0.22 191.98 6,606.85 59.65 317.72 4,544.02 4,476.57 3,037.68 -2,761.39 5,982,753.220 718,615.481 0.62 195.36 6,706.65 59.44 317.18 4,594.70 4,527.25 3,101.18 -2,819.68 5,982,814.972 718,555.340 0.51 199.05 6,80665 60.33 317.22 4,644.87 4,577.42 3,164.65 -2,878.45 5,982,876.673 718,494.720 0.89 202.37 6,906.65 60.45 316.99 4,694.28 4,626.83 3,228.34 -2,937.63 5,982,938.587 718,433.690 0.23 205.56 7,006.65 60.47 317.43 4,743.59 4,676.14 3,292.19 -2,996.73 5,983,000.655 718,372.731 0.38 208.92 7,106.65 60.58 316.78 4,792.79 4,725.34 3,355.96 -3,055.99 5,983,062.651 718,311.619 0.58 212.12 7,206.65 60.54 316.53 4,841.94 4,774.49 3,419.30 -3,115.76 5,983,124.187 718,250.001 0.22 214.63 7,306.65 59.39 316.93 4,892.00 4,824.55 3,482.33 -3,175.10 5,983,185.437 718,188.827 1.20 217.24 4242019 12:47:06PM Page 5 COMPASS 5000.1 Build 81D by BP Final Survey Report Company: North America -ALASKA - BP Local Coordinate Reference: Well NK -08 Project: Niakuk TVD Reference: ACTUAL KB P272 @ 67.45usft Site: NK MD Reference: ACTUAL KB P272 @ 67.45usft Well: NK -08 North Reference: True Wellbore: NK -088 Survey Calculation Method: Minimum Curvature Design: NK -08B Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS NIS EIW Northing Easting DLeg V. Sao (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) C/100usft) (usft) 7405.65 60.52 316.90 4,942.06 4,874.61 3,545.55 -3,234.23 5,983,246.879 718,127.858 1.13 220.14 7,506.65 59.59 317.56 4,991.98 4,924.53 3,609.16 -3,293.07 5,983,308.715 718,067.166 1.09 223.51 7,606.65 59.75 317.66 5,042.48 4,975.03 3,672.91 -3,351.26 5,963,370.714 718,007.120 0.18 227.44 7,706.65 59.45 318.00 5,093.08 5,025.63 3,736.83 -3,409.17 5,983,432.897 717,947.356 0.42 231.69 7,806.65 58.89 318.04 5,144.33 5,076.88 3,800.66 -3,466.60 5,983,495.002 717,888.062 0.56 236.22 7,906.65 59.55 317.73 5,195.50 5,128.05 3,864.39 -3,524.22 5,983,556.999 717,828.591 0.71 240.54 8,006.65 59.54 317.78 5,246.19 5,178.74 3,928.21 -3,582.17 5,983,619.070 717,768.779 0.04 244.68 8,106.65 60.03 316.71 5,296.52 5,229.07 3,991.66 -3,640.83 5,983,680.754 717,708.269 1.05 248.07 8,206.65 60.88 316.25 5,345.83 5,278.38 4,054.74 -3,700.74 5,983,742.036 717,646.527 0.94 250.31 8,306.65 61.35 315.86 5,394.13 5,326.68 4,117.78 -3,761.51 5,983,803.253 717,583.930 0.58 251.92 8,406.85 61.24 315.92 5,442.16 5,374.71 4,180.76 -3,822.56 5,983,864.395 717,521.048 0.12 253.29 8,506.65 60.41 316.23 5,490.91 5,423.46 4,243.64 -3,883.13 5,983,925.461 717,458.648 0.87 254.92 8,606.65 60.59 315.83 5,540.15 5,472.70 4,308.28 -3,943.55 5,983,986.285 717,396.399 0.39 256.49 8,706.65 61.03 316.60 5,588.92 5,521.47 4,369.31 -4,003.96 5,984,047.495 717,334.160 0.80 258.34 8,806.65 61.03 316.45 5,637.36 5,569.91 4,432.80 -4,064.15 5,984,109.173 717,272.118 0.13 260.67 8,906.65 61.88 316.18 5,685.14 5,617.69 4,496.32 4,124.83 5,984,170.873 717,209.597 0.88 262.68 9,006.65 62.34 316.24 5,731.92 5,664,47 4,560.12 4,185.99 5,984,232.838 717,146.578 0.46 264.55 9,106.65 62.21 316.48 5,778.44 5,710.99 4,624.18 4,247.08 5,984,295.063 717,083.625 0.25 266.65 9,206.65 62.57 316.35 5,824.79 5,757.34 4,688.37 4,308.17 5,984,357.413 717,020.666 0.38 268.84 9,306.65 62.69 317.21 5,870.76 5,803.31 4,753.08 4,368.99 5,984,420.300 716,957.970 0.77 271.60 9,406.65 62.62 317.25 5,916.70 5,849.25 4,818.29 -4,429.30 5,984,483.692 716,895.754 0.08 275.05 9,506.65 62.71 317.28 5,962.62 5,895.17 4,883.54 -4,489.59 5,984,547.127 716,833.572 0.09 278.57 9,606.65 63.15 317.10 6,008.12 5,940.67 4,948.86 4,550.10 5,984,610.632 716,771.158 0.47 281.97 9,706.(15 63.50 317.88 6,053.02 5,985.57 5,014.73 4,610.48 5,984,674.686 716,708.863 0.78 285.85 Top of Whipstock - Interpolated Point 9,776.00 63.34 318.20 6,084.05 6,016.60 5,060.85 4,651.94 5,984,719.558 716,666.052 0.47 289.14 Bottom of Whipstock - Interpolated Point 4/24/2019 12:4T06PM Page 6 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well NK -08 Project: Niakuk TVD Reference: ACTUAL KB P272 Q 67.45usft Site: NK MD Reference: ACTUAL KB P272 @ 67.45usft Well. NK -08 North Reference: True Wellbore: NK -08B Survey Calculation Method: Minimum Curvature Design: NK -08B Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS NIS ENV Northing Emitting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) ('AOOusft) (usft) 9,793.72 61.23 318.59 6,092.29 6,024.84 5,072.58 -4652.36 5,984,730.973 716,655.295 1207. 290.07 Interpolated Azimuth 9,886.92 57.87 320.66 6,139.52 6,072.07 5,133.76 -4,71441 5,984,790.584 716,601.458 4.08 296.52 Interpolated Azimuth 9,949.94 58.80 322.05 6,172.69 6,105.24 5,175.80 -4,747.87 5,984,831.423 716,566.781 2.20 302.45 Interpolated Azimuth 9,982.40 60.19 322.78 6,189.22 6,121.77 5,197.74 -4,764.91 5,984,853.048 716,549.096 5.27 306.06 Interpolated Azimuth 10,009.31 61.36 323.35 6,202.36 6,134.91 5,216.52 4,779.02 5,984,871.394 716,534.437 4.72 309.36 Interpolated Azimuth 10,042.68 61.53 324.08 6,218.31 6,150.86 5,240.14 -4,796.37 5,984,894.497 716,516.401 1.99 313.80 Interpolated Azimuth 10,073.54 62.34 324.76 - 6,232.83 6,165.38 5,262.29 -4,812.21 5,984,916.165 716,499.911 3.27 318.25 Interpolated Azimuth 10,104.65 63.35 325.44 6,247.12 6,179.87 5,285.14 -4,828.15 5,984,938:532 716,483.305 3.76 323.14 Interpolated Azimuth 10,137.07 64.02 326.14 6,261.40 8,193.95 5,309.02 -4,844.39 5,984,961.925 716,466.370 2.85 328.55 Interpolated Azimuth 10,168.02 64.88 327.07 6,274.75 6,207.30 5,332.34 -4,859.75 5,984,984.772 716,450.320 3.88 334.17 First clean survey 10,198.43 85.86 326.78 6,287.42 6,219.97 5,355.50 -4,874.84 5,985,007479 716,434.557 3.34 339.88 10,232.47 65.83 326.66 6,301.35 6,233.90 5,381.46 -4,891.88 5,985,032.928 716,416.755 0.33 346.19 10,263.65 65.86 326.49 6,314.11 6,246.66 5,405.21 -4,907.56 5,985,056.199 716,400.389 0.51 351.89 10,292.79 65.28 327.04 6,326.16 6,258.71 5,427.40 -4,922.10 5,985,077.949 716,385.199 2.63 357.30 10,376.82 63.48 329.10 6,362.50 6,295.05 5,491.69 4,962.17 5,985,141.025 716,343.242 3.08 374.43 10,471.11 63.54 328.83 6,404.56 6,337.11 5,564.00 -5,005.68 5,985,212.015 716,297.618 0.26 394.79 10,564.99 63.58 330.53 6,446.36 6,378.91 5,636.56 -5,048.12 5,985,283.285 716,253.061 1.62 416.09 10,659.74 63.51 330.59 6,488.57 6,421.12 5,710.43 -5,089.81 5,985,355.892 716,209.204 0.09 438.85 10,754.33 63.50 330.99 6,530.77 6,463.32 5,784.33 -5,131.12 5,985,428.526 718,165.727 0.38 461.88 4242019 12:47.06PM Page 7 COMPASS 5000.1 Build BID ee BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well NK -08 Project: Niakuk TVD Reference: ACTUAL KR P272 @ 67.45usft Site: NK MD Reference: ACTUAL KB P272 @ 67.45usft Well NK -08 North Reference: True Wellbore: NK -08B Survey Calculation Method: Minimum Curvature Design: NK -08B Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS NIS BIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) ('1100usft) (usft) 10,84871 63.51 333.33 6,572.88 6,505.43 5,859.01 -5,170.56 5,985,502.006 716,124097 2.22 486.80 10,942.79 63.53 334.62 6,614.83 6,547.38 5,934.68 -5,207.51 5,985,576.550 716,084.932 1.23 514,18 11,037.19 63.49 337.93 6,656.95 6,589.50 6,012.01 -5,241.50 5,985,652.842 716,048.675 3.14 544.83 11,131.00 63.53 338.93 6,698.79 6,631.34 6,090.09 -5,272.37 5,985,729.972 716,015.516 0.96 578.22 11,225.49 63.46 339.74 6,740.96 6,673.51 6,169.21 -5,302.21 5,985,808.169 715,983.352 0.77 613.06 11,320.06 63.57 341.17 6,783.14 6,715.69 6,248.97 -5,330.52 5,985,887.059 715,952.692 1.36 649.44 11,414.59 64.06 345.51 6,824.87 6,757.42 6,330.22 -5,354.83 5,985,967.544 715,925.998 4.15 689.70 11,509.81 64.02 348.81 6,866.56 6,799.11 6,413.67 -5,373.85 5,986,050.398 715,904.519 3.12 735.26 11,604.10 64.38 350.20 6,907.60 6,840.15 6,497.14 -5,389.31 5,986,133.369 715,886.599 1.38 783.35 11,698.52 64.38 349.62 6,948.42 6,880.97 6,580.96 -5,404.23 5,986,216.707 715,869.214 0.55 832.08 11,793.17 64.38 350.36 6,989.35 6,921.90 6,665.00 -5,419.06 5,986,300.273 715,851.904 0.70 881.01 11,888.22 64.43 350.27 7,030.41 6,962.96 6,749.50 -5,433.48 5,986,384.307 715,834.993 0.10 930.57 11,982.16 64.41 350.44 7,070.97 7,003.52 6,833.04 -5,447.68 5,986,467.382 715,818.335 0.16 97960 12,076.76 64.25 350.81 7,111.95 7,044.50 6,917,16 -5,461.57 5,986,551.055 715,801,967 0.39 1,029.26 12,170.80 64.27 350.95 7,152.79 7,085.34 7,000.80 -5,474.99 5,986,634.256 715,786.075 0.14 1,078.91 12,265.55 64.19 352.40 7,193.99 7,126.54 7,085.23 -5,487.35 5,986,718.275 715,771.232 1.38 1,129.87 12,360.52 64.22 352.81 7,235.32 7,167.87 7,170.02 -5,498.35 5,986,802.705 715,757.727 0.39 1,182.05 12,455.19 64.21 352.08 7,276.50 7,209.05 7,254.52 -5,509.56 5,986,886.836 715,744.027 0.69 1,233.87 12,549.03 64.33 352.58 7,317.24 7,249.79 7,338.30 -5,520.84 5,986,970.241 715,730.275 0.50 1,285.14 12,644.24 64.19 353.22 7,358.58 7,291.13 7,423.41 -5,531.45 5,987,054.992 715,717.165 0.62 1,337.82 12,738.79 62.59 354.42 7,400.94 7,333.49 7,507.45 -5,540.55 5,987,138.720 715,705.580 2.04 1,390.80 12,833.62 60.01 357.29 7,446.48 7,379.03 7,590.39 -5,546.59 5,987,221.443 715,697.095 3.80 1,445.18 12,927.74 57.73 359.47 7,495.14 7,427.69 7,670.91 -5,548.88 5,987,301.857 715,692.421 3.13 1,500.50 13,022.27 55.31 1.89 7,547.29 7,479.84 7,749.73 -5,547.97 5,987,380.671 715,691.004 3.33 1,556.88 13,116.55 53.05 4.25 7,602.46 7,535.01 7,826.06 -5,543.90 5,987,457.080 715,692.818 3.14 1,613.73 13,211.86 50.27 6.21 7,661.59 7,594.14 7,900.49 -5,537.11 5,987,531.678 715,697.404 3.33 1,671.16 13,306.15 47.80 7.44 7,723.40 7,655.95 7,971.18 -5,528.67 5,987,602.582 715,703.757 2.80 1,727.12 4/242019 12'4T.06PM Page 8 COMPASS 5000.1 Build 81D BP by Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well NK -08 Project: Niakuk TVD Reference: ACTUAL KB P272 @ 67.45usft Site: NK MD Reference: ACTUAL KB P272 @ 67.45usft Well: NK -08 North Reference: True Wellbore: NK -08B Survey Calculation Method: Minimum Curvature Design: NK -08B Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS NIS E/W Northing Essdng DLeg V. Sec (usft) V) (1) (usft) (usft) (usft) (usft) (usft) (usft) (°/100us@) (usft) 13,400.04 46.14 8.93 7787.47 7,720.02 8,039.11 -5,518.91 5,987 670 767 715,711.504 2.11 1782.05 13,495.21 43.00 11.67 7,855.26 7,787.81 8,104.79 -5,506.90 5,987,736.767 715,721.563 3.95 1,836.98 13,590.55 40.85 15.80 7,926.21 7,858.76 8,166.62 -5,491.72 5,987,799.022 715,734.910 3.56 1,891.44 13,683.47 38.70 18.15 7,997.62 7,930.17 8,223.48 -5,474.39 5,987,856.360 715,750.548 2.82 1,943.89 13,777.77 36.66 23.02 6,072.27 8,004.82 8,277.42 -5,454.20 5,987,910.872 715,769.143 3.83 1,996.32 13,872.19 35.05 28.58 8,148.81 8,081.36 8,327.18 -5,430.19 5,987,961.326 715,791.861 3.85 2,048.48 13,967.40 33.69 34.65 8,227.42 8,159.97 8,372.93 -5,402.09 5,988,007.881 715,818.398 3.87 2,10070 14,061.40 32.63 40.45 8,306.13 8,238.68 8,413.68 -5,370.82 5,988,049.529 715,848.453 3.56 2,151.62 14,156.11 31.67 46.54 8,386.34 8,318.89 8,450.22 -5,336.20 5,988,087.078 715,881.980 3.57 2,201.95 14,249.94 31.64 53.91 8,466.24 8,398.79 8,481.67 -5,298.41 5,988,119.631 715,918.813 4.12 2,250.90 14,344.90 31.68 60.72 8,547.09 8,479.64 8,508.55 -5,256.52 5,988,147.731 715,959.889 3.76 2,299.53 14,378.92 31.89 64.75 8,576.02 8,508.57 8,516.75 -5,240.60 5,988,156.401 715,975561 6.27 2,316.59 14,410.18 32.59 67.51 8,60246 8,535.01 8,523.49 -5,225.35 5,988,163.591 715,990.602 5.21 2,332.14 14,439.62 33.02 70.21 8,627.20 6,559.75 8,529.24 -5,210.48. 5,988,169.777 716,005.299 5.18 2,346.72 14,472.87 33.10 72.79 8,655.07 8,587.62 8,535.00 -5,193.28 5,988,176.036 716,022.318 4.24 2,362.95 14,534.64 32.92 76.90 8,706.88 8,639.43 8,543.79 -5,160.82 5,988,185.787 716,054.506 3.64 2,392.12 14,628.69 33.06 82.28 8,785.78 8,718.33 8,553.03 -5,110.50 5,988,196.510 716,104.532 3.12 2,434.24 14,721.83 33.05 83.49 8,863.85 8,796.40 8,559.32 -5,060.09 5,988,204.289 716,154.731 0.71 2,474.33 14,816.39 33.04 84.10 8,943.11 8,875.66 8,564.90 -5,008.83 5,988,211.374 716,205.802 0.35 2,514.52 14,911.00 33.03 85.63 9,022.43 8,954.98 8,569.51 41,957.46 5,988,217.506 716,257.007 0.88 2,554.11 15,005.65 33.15 86.08 9,101.73 9,034.28 8,573.25 4,905.92 5,988,222.762 716,308.411 0.29 2,593.19 15,100.58 33.13 85.00 9,181.22 9,113.77 8,577.28 -4,854.18 5,988,228.324 716,360.005 0.62 2,632.63 15,195.55 33.06 84.27 9,260.78 9,193.33 8,582.13 -4,802.56 5,988,234.695 716,411.465 0.43 2,672.56 15,290.72 33.11 83.72 9,340.52 9,273.07 8,587.57 -4,750.89 5,988,241.654 716,462.946 0.32 2,712.94 15,384.88 33.12 83.92 9,419.38 9,351.93 8,593.10 -4,699.75 5,988,248.701 716,513.900 0.12 2,753.02 15,480.06 33.08 84.02 9,499.12 9,431.67 8,598.56 -4,648.06 5,988,255.686 716,565.405 0.07 2,793.43 15,574.32 33.08 85.48 9,578.10 9,510.65 8,603.27 <,596.83 5,988,261.904 716,616.470 0.85 2,832.98 424/2019 12:47:06PM Page 9 COMPASS 5000.1 Build 81D BP bp Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well NK -08 Project: Niakuk TVD Reference: ACTUAL KS P272 @ 67.45usft Site: NK MD Reference: ACTUAL KB P272 @ 67.45usft Well: NK -08 North Reference: True Wellbore: NK -0813 Survey Calculation Method: Minimum Curvature Design: NK -08B Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (') V) (usft) (usft) (usft) (usft) (usft) (usft) (Wousft) (usft) 15,668.89 33.12 84.84 9,657.32 9,589.87 8,607.63 -4,545.37 5,988,267.780 716,667776 0.37 2,872.45 15,762.93 33.11 86.62 9,736.09 9,668.64 8,611.45 -4,494.14 5,988,273.117 716,718.867 1.03 2,911.38 15,858.25 33.11 86.49 9,815.93 9,748.48 8,614.58 -4,442.16 5,988,277.780 716,770.724 0.07 2,950.35 15,904.59 33.14 86.17 9,654.74 9,787.29 8,616.20 4,416.89 5,988,280.147 716,795.935 0.38 2,969.36 15,978.04 35.51 84.77 9,915.40 9,847.95 8,619.49 4,375.61 5,988,284.652 716,837.100 3.40 3,000.88 16,009.15 38.74 84.33 9,940.20 9,872.75 8,621.28 4,356.92 5,988,286.989 716,855.727 10.42 3,015.35 16,041.11 42.87 84.42 9,964.39 9,896.94 8,623.32 4,336.14 5,988,289.648 716,876.437 12.92 3,031.49 16,072.69 46.13 64.73 9,986.91 9,919.46 8,625.41 4,314.11 5,988,292.388 716,898.397 10.35 3,048.55 16,103.81 48.33 85.51 10,008.04 9,940.59 8,627.35 4,291.35 5,988,295.001 716,921.089 7.30 3,066.02 16,136.01 51.18 85.95 10,028.84 9,961.39 8,629.18 -4,266.84 5,988,297.552 716,945.531 8.91 3,084.64 16,167.44 53.84 85.06 10,047.97 9,980.52 8,631.14 4,241.98 5,988,300.243 716,970.320 8.76 3,103.60 16,197.53 56.61 85.57 10,065.13 9,997.68 8,633.16 4,217.35 5,988,302.986 716,994.879 9.31 3,122.44 16,229.85 59.24 85.15 10,082.29 10,014.84 8,635.37 -4,190.08 5,988,306.009 717,022.095 8.21 3,143.31 16,261.11 62.44 85.54 10,097.52 10,030.07 8,637.59 -4,162.85 5,988,309.025 717,049.221 10.29 3,164.11 16,291.33 66.01 86.93 10,110.136 10,043.21 8,639.37 -4,135.70 5,988,311.608 717,076.305 12.52 3,184.57 16,324.74 69.78 86.27 10,123.23 10,055.78 8,641.20 -4,104.81 5,988,314.358 717,107.129 11.43 3,207.72 16,356.78 72.65 87.24 10,133.54 10,086.09 8,642.92 -4,074.53 5,988,316,966 717,137.345 9.40 3,230.34 16,385.61 75.16 85.30 10,141.54 10,074.09 8,644.72 -4,046.89 5,988,319.587 717,164.916 10.84 3,251.16 16,419.02 79.54 84.82 10,148.85 10,081.40 8,647.53 -4,014.42 5,988,323.353 717,197.287 13.18 3,276.10 16,450.40 82.05 85.97 10,153.87 10,086.42 8,650.02 -3,983.55 5,988,326.749 717,228.072 8.78 3,299.69 16,479.97 85.25 87.20 10,157.14 10,089.69 8,651.77 -3,954.22 5,988,329.365 717,257.338 11.58 3,32167 16,513.26 89.39 86.13 10,158.70 10,091.25 8,653.70 -3,921.03 5,988,332.279 717,290.455 12.84 3,346.51 16,544.31 91.54 84.77 10,15845 10,091.00 8,656.16 -3,890.08 5,988,335.655 717,321.316 8.19 3,370.13 16,573.66 94.11 84.86 10,157.00 10,089.55 8,658.86 -3,860.89 5,988,339.216 717,350.409 8.76 3,392.68 16,607.73 97.10 83.82 10,153.67 10,086.22 8,662.27 -3,827.16 5,988,343.613 717,384.024 9.11 3,418.94 16,638.73 99.04 82.59 10,149.32 10,081.87 8,665.90 -3,796.68 5,988,348.142 717,414.378 7.39 3,443.05 16,669.24 10146 82.08 10,143.89 10,078.44 8,669.90 -3,766.93 5,988,353.023 717,443.998 8.10 3,466.92 42412019 12:47.06PM Page 10 COMPASS 5000 1 Build 81D BP by Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well NK -08 Project: Niakuk TVD Reference: ACTUAL KB P272 @ 67.45usft Site: NK MD Reference: ACTUAL KB P272 @ 67.45usft Well: NK -08 North Reference: True Wellbore: NK -08B Survey Calculation Method: Minimum Curvature Design: NK -086 Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (•) (usft) (usft) (usft) (usft) (raft) (usft) (•NOOusft) (usft) 18701.50 104.50 81.21 10,13&65 10,069.20 8,674.47 -3,735.83 5,988,358.506 717,474.946 9.78 3,492.14 16,733.23 106.81 80.50 10,128.08 10,060.63 8,679.32 -3,705.67 5,988,364.249 717,504.951 7.59 3,516.90 16,762.88 108.90 78.33 10,118.99 10,051.54 8,684.50 -3,677.93 5,988,370.247 717,532.523 9.91 3,540.18 16,795.56 109.95 75.91 10,106.12 10,040.67 8,691.37 -3,647.89 5,988,377.998 717,562.347 7.69 3,566.28 16,827.76 109.86 73.46 10,097.16 10,029.71 8,699.36 -3,618.69 5,988,386.853 717,591.295 7.16 3,592.58 16,858.04 109.96 71.16 10,086.85 10,019.40 8,708.01 -3,591.57 5,988,396.301 717,618.148 7.15 3,617.87 16,889.92 109.87 68.28 10,075.99 10,008.54 8,718.40 -3,563.46 5,988,407.514 717,645.940 8.50 3,645.10 16,921.89 109.77 67.81 10,065.15 9,997.70 8,729.65 -3,535.56 5,988,419.578 717,673.489 1.42 3,672.77 16,952.00 109.77 67.66 10,054.96 9,987.51 8,740.38 -3,509.34 5,988,431.084 717,699.382 0.47 3,698.91 16,984.44 109.74 67.76 10,044.00 9,976.55 8,751.95 -3,481.09 5,988,443.493 717,727.275 0.30 3,727.07 17,016.32 109.86 67.94 10,033.20 9,965.75 8,763.27 -3,453.31 5,988,455.618 717,754.709 0.65 3,754.71 17,047.05 109.96 68.36 10,022.73 9,955.28 8,774.03 -3,426.49 5,988,467.158 717,781.196 1.33 3,781.28 17,141.75 109.87 68.72 9,990.47 9,923.02 8,80660 -3,343.63 5,988,502.165 717,863.058 0.37 3,862.90 1 17,174.08 109.51 69.31 9,979.58 9,912.13 8,817.50 -3,315.21 5,988,513.901 717,891.143 2.05 3,890.71 17,206.31 1011 70.29 9,969.02 9,901.57 8,828.02 -3,286,63 5,988,525.255 717,919.397 3.76 3,918.35 17,235.85 106.70 70.20 9,960.04 9,892.59 8,837.53 -3,260.15 5,988,535.543 717,945.585 6.88 3,943.80 17,268.52 102.64 69.15 9,951.76 9,884.31 8,848.50 -3,230.52 5,988,547.391 717,974.876 12.81 3,972.52 17,300.32 99.42 69.36 9,945.68 9,878.23 8,859.56 -3,201.33 5,988,559.302 718,003.720 10.15 4,000.97 17,330.12 97.78 66.81 9,941.22 9,873.77 8,870.56 -3,174.00 5,988,571.102 718,030.714 10.09 4,028.07 17,363.59 95.83 66.15 9,937.26 9,869.81 8,883.82 -3,143.53 5,988,585.258 718,060.779 6.15 4,059.00 17,394.97 93.46 67.11 9,934.72 9,867.27 8,896.22 -3,114.82 5,988,598.506 718,089.107 8.14 4,068.07 17,424.24 91.80 65.35 9,933.37 9,865.92 8,908.01 -3,088.06 5,988,611.075 718,115.503 8.26 4,115.32 17,457.01 89.96 66.99 9,932.87 9,865.42 8,921.24 -3,058.09 5,988,625.192 718,145.068 7.52 4,145.87 17,489.17 88.30 68.21 9,933.36 9,865.81 8,933.50 -3,028.37 5,988,638.317 718,174.420 641 4,175.56 17,519.36 88.42 69.53 9,934.22 9,866.77 8,944.38 -3,000.22 5,988,650.022 718,202.233 4.39 4,203.16 17,552.05 87.62 69.54 9,935.35 9,867.90 8,955.80 -2,969.61 5,988,662.344 718,232.489 2.45 4,232.88 17,583.35 86.11 68.23 9,937.06 9,869.61 8,967.06 -2,940.46 5,988,674.458 718,261.296 6.38 4,26145 41242019 12'47:06PM Page 11 COMPASS 5000.1 Build 81D PRE BP Final Survey Report Company: North America - ALASKA- BP Local Coordinate Reference: Well NK -08 Project: Niakuk TVD Reference: ACTUAL KB P272 @ 67.45usft Site: NK MD Reference: ACTUAL KB P272 @ 67.45usft Well: NK -08 North Reference: True Wellbore: NK -08B Survey Calculation Method: Minimum Curvature Design: NK -08B Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS NIS E/W Northing Easting DL•g V. Sec (usft) (°) V) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 17,613.53 85.99 68.56 9,939.14 9,871.69 8,978.14 -2,912.46 5,988,686.366 718,288.948 1.16 4,289.08 17,646.59 88.01 65.83 9,940.87 9,873.42 8,990.94 -2,882.03 5,988,700.054 718,318.984 10.26 4,319.65 17,677.94 88.45 66.25 9,941.84 9,874.39 9,003.66 -2,853.40 5,988,713.619 718,347.229 1.84 4,348.89 17,708.09 90.88 65.92 9,942.02 9,874.57 9,015.88 -2,825.84 5,988,726.648 718,374.414 8.13 4,377.02 17,741.02 92.04 65.66 9,941.18 9,873.73 9,029.38 -2,795.82 5,988,741.028 718,404.024 3.61 4,407.80 17,772.23 92.04 65.30 9,940.07 9,872.62 9,042.33 -2,767.44 5,988,754.805 718,432.005 1.15 4,437.02 17,802.56 91.98 64.95 9,939.01 9,871.56 9,055.08 -2,739.94 5,988,768.362 718,459.114 1.17 4,465.48 17,835.21 92.04 64.73 9,937.86 9,870.41 9,068.95 -2,710.41 5,988,783.100 718,488.224 0.70 4,496.17 17,867.45 91.98 64.91 9,936.73 9,869.28 9,082.66 -2,681.25 5,988,797.664 718,516.964 0.59 4,526.48 17,897.58 92.01 66.36 9,935.68 9,868.23 9,095.08 -2,653.82 5,988,810.690 718,544.012 4.81 4,554.66 17,930.32 92.14 67.06 9,934.49 9,867.04 9,108.02 -2,623.77 5,988,824.708 718,573.666 2.17 4,585.Ofi 17,962.12 92.01 65.52 9,933.34 9,865.89 9,120.80 -2,594.67 5,988,838.340 718,602.372 4.86 4,614.67 17,992.41 91.98 64.96 - 9,932.29 9,864.84 9,133.47 -2,567.18 5,988,851.825 718,629.473 1.85 4,643.07 18,024.75 92.01 64.79 9,931.18 9,863.71 9,147.20 -2,537.92 5,988,886406 718,658.316 0.53 4,673.47 18,056.25 91.86 64.80 9,930.10 9,862.65 9,160.65 -2,509.46 5,988,880.697 718,686.366 0.77 4,703.11 18,087.07 90.82 64.50 9,929.38 9,861.93 9,173.89 -2,481.64 5,988,894.753 718,713.782 3.39 4,732.14 18,119.22 89.96 65.62 9,929.16 9,861.71 9,18745 -2,452.49 5,988,909.164 718,742.518 4.39 4,762.34 18,150.94 90.02 66.13 9,929.17 9,861.72 9,200.41 -2,423.54 5,988,922.978 718,771.071 1.82 4,791.98 18,181.29 89.99 65.75 9,929.16 9,861.71 9,212.79 -2,395.82 5,988,936.164 718,798.405 1.26 4,820.32 18,213.80 90.02 67.21 9,929.16 9,861.71 9,225.76 -2,366.01 5,988,950.012 718,827.816 4.49 4,850.57 18,244.99 90.02 66.21 9,929.15 9,861.70 9,238.09 -2,337.37 5,988,963.184 718,856.085 3.21 4,879.55 18,275.99 90.05 65.32 9,929.13 9,86188 9,250.82 -2,309.10 5,988,976.738 718,883.964 2.87 4,908.54 18,307.57 88.64 64.67 9,929.49 9,862.04 9,264.17 -2,280.48 5,988,990.925 718,912.173 4.92 4,93821 18,339.45 87.10 63.81 9,930.68 9,663.23 9,278.01 -2,251.79 5,989,005.611 718,940.441 5.53 4,968.29 18,370.46 87.04 64.35 9,932.26 9,864.81 - 9,291.55 -2,223.94 5,989,019.965 718,967.881 1.75 4,997.56 18,402.19 86.61 61.23 9,934.02 9,866.57 9,306.03 -2,195.77 5,989,035.275 718,995.612 8.91 5,027.72 18,433.88 85.96 60.81 9,936.07 9,868.62 9,321.35 -2,168.10 5,989,051.406 719,022.809 2.44 5,058.11 42412019 1247,06PM Page 12 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well NK -08 Project: Niakuk TVD Reference: ACTUAL KB P272 @ 67.45usft Site: NK MD Reference: ACTUAL KB P272 @ 67.45usft Well: NK -08 North Reference: True Wellbore: NK -0813 Survey Calculation Method: Minimum Curvature Design: NK -08B Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi TVD TVDSS NIS EIW Northing Easting DLeg V. See (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 18464.46 84.33 63.47 9,936.66 9,871.21 9,335.59 -2,141.17 5,989,066.433 719,049.310 10.17 5,087.23 18,497.03 84.02 68.15 9,941.97 9,874.52 9,348.87 -2,111.62 5,989,080.574 719,078.452 14.33 5,117.51 18,529.00 84.05 70.15 9,945.29 9,877.84 9,360.18 -2,081.91 5,989,092.763 719,107.816 6.22 5,146.52 16,559.15 83.99 70.43 9,948.43 9,880.98 9,370.29 -2,053.88 5,989,103.705 719,135.733 0.94 5,173.63 18,592.39 84.42 72.08 9,951.79 9,884.34 9,380.92 -2,022.36 5,989,115.252 719,166.719 5.11 5,203.29 18,624.05 85.95 73.06 9,954.45 9,887.00 9,390.37 -1,992.26 5,989,125.586 719,196.524 5.73 5,231.25 18,653.32 85.99 74.47 9,956.50 9,889.05 9,398.53 -1,964.23 5,989,134.573 719,224.302 4.81 5,256.85 18,748.40 85.99 74.61 9,963.15 9,895.70 9,423.82 -1,872.81 5,989,162.545 719,314.926 0.15 5,339.36 18,842.80 87.04 76.79 9,968.89 9,901.44 9,447.09 -1,781.52 5,989,188.503 719,405.494 2.56 5,420.38 18,936.83 87.07 73.60 9,973.72 9,906.27 9,471.08 -1,690.74 5,989,215.166 719,495.518 3.39 5,501.53 19,030.51 86.88 73.35 9,976.67 9,911.22 9,497.69 -1,601.05 5,989,244.412 719,564.374 0.33 5,583.76 19,125.40 86.02 70.96 9,984.54 9,917.09 9,526.71 -1,510.91 5,989,276.081 719,673.617 2.67 5,668.03 19,157.59 85.90 70.61 9,986.81 9,919.36 9,537.22 -1,480.57 5,989,287.488 719,703.631 0.60 5,696.91 19,189.87 84.88 71.80 9,989.41 9,921.96 9,547.54 -1,450.09 5,989,298.696 719,733.789 4.40 5,725.76 19,220.38 84.05 72.05 9,992.35 9,924.90 9,556.96 -1,421.22 5,989,308.967 719,762.366 2.84 5,752.83 19,284.89 83.71 72.14 9,999.20 9,931.75 9,578.62 -1,360.38 5,989,330.414 719,822.602 0.55 5,809.76 19,315.19 83.06 7240 10,002.72 9,935.27 9,585.84 -1,331.52 5,989,340.489 719,851.173 2.29 5,836.69 19,347.16 83.96 73.88 10,006.33 9,938.88 9,595.06 -1,301.12 5,989,350.595 719,881.285 5.39 5,864.70 19,378.98 84.02 75.70 10,009.66 9,942.21 9,603.36 -1,270.59 5,989,359.795 719,911.560 5.69 5,892.16 19,409.65 83.99 76.55 10,012.87 9,945.42 9,610.67 -1,240.97 5,989,367.981 719,940.942 2.76 5,918.27 19,504.10 84.05 75.01 10,022.71 9,955.26 9,633.75 -1,149.92 5,989,393.735 720,031.271 1.62 5,998.97 19,598.41 84.51 75.42 10,032.11 9,964.66 9,657.69 -1,059.19 5,989,420.351 720,121.253 0.65 6,080.06 19,692.51 84.98 75.41 10,040.73 9,973.28 9,681.29 -968.50 5,989,446.616 720,211.197 0.50 6,160.87 19,725.25 85.07 75.34 10,043.56 9,976.11 9,689.53 -936.94 5,989,455.780 720,242.498 0.35 6,189.01 19,756.79 83.65 75.82 10,046.66 9,979.21 9,697.34 -906.54 5,989,464.490 720,272.650 4.75 6,216.03 19,787.11 81.45 75.89 10,050.60 9,983.15 9,704.69 -877.39 5,989,472.695 720,301.570 7.26 6,241.84 19,819.70 78.11 75.23 10,056.38 9,988.93 9,712.68 -846.34 5,989,481.604 720,332.374 10.44 6,269.45 4242019 12:47:06PM Page 13 COMPASS 5000.1 Build 81D by Company: North Americo - ALASKA - BP Project: Niakuk Site: NK Well: NK -08 Wellbore: NK -08B Design: NK -08B Survey MD Inc Azi (usft) (1) (') 19,858.00 78.11 75.23 Projection to TD BP Final Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method; Database: Well NK -08 ACTUAL KB P272 @ 67.45usft ACTUAL KB P272 0 67.45usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 TVD TVDSS NIS EIW Northing Eluding DLeg V. Sec (usft) (usft) (usft) (usft) (usft) (usft) (Y100usft) (usft) 10,064.27 9,996.82 9,722.24 -810.10 5,989,492.225 720,368.314 0.00 6,301.83 472412019 12:47:06PM Page 14 COMPASS 5000.1 Build 81D Nm) a N xwA1.1 ME RE DETA M NK -M REF6tl:KE1ipV4AiNN $Ib: I$( cuoEnblxfl Relae4re. We1N(M.TmxvN NMI: W45 Wabm: NK-0AB x NK-06 smm Nsl R.beme: Sra.IPM BBBE) Aa4ul: NK-0BB se NmmmE Rdaere: XL KBkn TIB an MD: 8706.85 r _ — meoo wnm w�emcmev® AOGCC - Spider Plot Easting (500 usNn) vtk"O' s,K� b North America - ALASKA - BP Niakuk NK NK -08 NK -08B NK -08B 500292249102 AOGCC Offset Well Report 24 April, 2019 RE, Company: North America - ALASKA - BP Project: Niakuk Reference Site: NK Site Error: 0 oousft Reference Well: NK -08 Well Error: 0o0usft Reference Wellbore NK -088 Reference Design: NK -08B BP Anticollision Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well NK -08 ACTUAL KB P272 @ 67.4511aft ACTUAL KB P272 @ 67.45usft True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference NK -08B (usft) Filtertype: NO GLOBAL FILTER: Using user defined selection 8 filtering cniena 9,706.65 1 : Gyrodata gymcompassing m/ (NK -08) Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 4/24/2019 From To (usft) (usft) Survey(Weilbom) 106.65 9,706.65 1 : Gyrodata gymcompassing m/ (NK -08) 9,776.00 10,292.79 Survey#1 (NK -08B) 10,376.82 15,904.59 Survey#2(NK-08B) 15,978.04 19,858.00 Survey#3(NK-08B) Tool Name Description GYD-GC-MS Gyrodata gyrocompassing mls BLIND Blind drilling MWD+IFR+MS-WOCA MWD +IFR+Multi Station W/O Crustal MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal 4124/2019 1: 13: 16PM Page 2 o1 3 COMPASS 5000.1 Build 81D BP bp Anticollision Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Well NK -08 Project: Niakuk TVD Reference: ACTUAL KB P272 @ 67.45usft Reference Site: NK MD Reference: ACTUAL KB P272 @ 67.45usft Site Error: 0.00usft North Reference: True Reference Well: NK -08 Survey Calculation Method: Minimum Curvature Well Error: O.00usft Output errors are at 1.00 sigma Reference Wellbore NK -08B Database: EDM RSK- Alaska PROD -ANCP1 Reference Design: NK -OSB Offset TVD Reference: Offset Datum Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) NK NK -07 - NK -07 - NK -07 458.60 450.00 31.79 NK -07 -NK -07A -NK -07A 464.54 450.00 31.90 NK -08 -NK -08 -NK -OB 10,030.95 10,025.00 20.31 NK -08 - NK -08A - NK -08A 10,014.04 10,000.00 18.91 NK -09. NK -09. NK -09 757.24 750.00 25.12 NK -10 - NK -10 - NK -10 835.83 825.00 58.20 NK -11 - NK -11 - NK -11 857.28 850.00 86.54 NK -11 - NK -11A- NK -11A 11,614.42 12,800.00 136.02 NK -11 - NK-11APB1 - NK-11APB1 11,614.42 12,800.00 136.02 NK -11 -NK -11 PB1-NK-1I PBI 857.28 850.00 86.54 NK -11 -NK -11 PB2-NK-11 PB2 857.28 850.00 86.54 NK -12 -NK -12 -NK -12 684.93 675.00 118.83 NK -12 - NK -12A- NK -12A 15,170.28 14,450.00 113.72 NK -12 -NK -12B -NK -12B 693.15 675.00 118.96 NK -12 -NK -12C -NK -12C 693.15 675.00 118.96 NK -13 - NK -13 - NK -13 - 906.78 900.00 139.37 NK -14 - NK -14 - NK -14 931.87 925.00 170.44 NK -14 -NK -14A -NK -14A 931.87 925.00 170.44 NK -14 - NK-14APB1 - NK-14APBI 931.87 925.00 170.44 NK -14 -NK -14B -NK -14B 924.43 925.00 170.34 NK -15 -NK -15 -NK -15 956.59 950.00 203.92 NK -15 -NK -15A -NK -15A 950.00 950.00 203.60 NK -15 -NK -15A JMH -NK-ISA JMH 950.00 950.00 203.60 NK -16 -NK -16 -NK -16 1,001.94 1,000.00 229.98 NK -17 -NK -17 -NK -17 1,002.63 1,000.00 261.06 NK-17-NK-17PB1-NK-17PB1 1,002.63 1,000.00 261.06 NK -17 - NK-17PB2 - NK-17PB2 1,002.63 1,000.00 261.06 NK -17 -Plan NK -17a -Plan NK -17a 1,001.69 1,000.00 261.05 NK -27 - NK -27 - NK -27 631.67 625.00 53.74 NK -28 - NK -28 - NK -28 607.11 600.00 17.54 NK -28 -Plan NK-28A-NK-28AWP07 Prelim 625.82 625.00 17.87 NK -29 - NK -29 - NK -29 731.74 725.00 13.06 NK -38 - NK -38 - NK -38 932.99 925.00 282.02 NK -38 -NK -38A -NK -38A 943.23 925.00 282.18 NK -38 - NK-38APB1 - NK-30APB1 943.23 925.00 282.18 NK -38 -NK -38B -NK -38B 943.23 925.00 282.18 NK -61 -NK -61 -NK -01 1,082.75 1,075.00 222.60 NK-61-NK-61A-NK61A 1,082.75 1,075.00 222.60 NK -62 - NK -62 - NK -62 711.53 700.00 246.21 NK-62-NK-62A-NK62A 711.53 700.00 246.21 NK -62 - NK-62APBI - NK-62APB1 711.53 700.00 246.21 NK -65 -NK -65 -NK -65 1,078.78 1,075.00 310.01 NK-65-NK-65A-NK65A 1,090.01 1,075.00 310.18 NK-65-NK-65PB1-NK65PB1 1,078.78 1,075.00 310.01 NK -65 - NK-65PB2 - NK-65PB2 1,078.78 1,075.00 310.01 NK 01 Island NK -01 - NK -01 - NK -01 12,202.94 7,325.00 473.44 NK-01-NK-0IA-NK-01A 12,202.94 7,325.00 473.44 4242019 1: 13: 16PM Page 3 of 3 COMPASS 5000.1 Build 81D Printed 5/16/2019 2:52:52PM North America - ALASKA - BP Page 1 of 2 Cementing Report Common Well Name: NK -08 102 _. Report no.: 1 - I. Report date: 4/10/2019 Project: Niakuk _ Site: NK Spud Daterrime: 7/14/1994 Event Type: RE-ENTER- ONSHORE (RON) Sten Date: 3/22/2019 End Dale: 4118I2019 AEE No.: Contractor: PARKER DRILLING CO. Rig Name/No.. PARKER 272 Rip Release: 4/22/2019 X3 -0199F -C: (8.452,503.00 ) BPUOI: USA00001319 Active datum'. ACTUAL KB P272 @67.45usft (above Mean Sea Level) General Information Job type: Primary Cement job start date/time: 4/10/2019 2:OOAM Job end dateftime: 4/10/2019 S:OOAM Cement Company: SCHLUMBERGER Cementer: DYLAN Nl4UGH Cemented String: LINER 1 String Size: 7.000 (in) String Set TMD: 15,935.01 (usft) Hole Size: 9.250 (in) Pipe Movement Pipe Movement: RECIPROCATING Rotating Time (Start -End): RPM: Rotating Torque (initlavg/max): (ft-lbt) Reciprocating Time (Start -End)'. Recip Drag Up/Dovm- (kip) SPM: Stroke Length: Fluid Name: SPACER Fluids (1 of 2) Slurry Type'. SPACER Purpose. SPACER Class: Description: MUD PUSH II Density: 12.00 (ppg) Yield Mix Water Ratio: Excess: Mix Method: BATCH Sacks Used: Water Volume: Excess Slurry Volume: 0.0 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 40.0 (bbl) Excess Measured From: Mud Type. Density: 10.70 (ppg) PV'. 12.00 (cp) YP: 18.000 (lbf/100" Viscosity: 48.00 (s/qq Gels 10 Sec. 8.000 (Ibfll DOW) Gels 10 Min: 11.000 (lbf/10011�) FWId Name: CEMENT Faulds (2 of 2) Slurry Type: CEMENT Purpose: PRIMARY Class: G -CLASS Description: TAIL SLURRY Density: 16.80 (ppg) Yield 1.1700 (R'/sk) Mix Water Ratio: 3.013 (gaVsk94) Excess: 40.00(%) Mix Method: Sacks Used* 508.50 (941b sacks) Water Volume: 36.5 (bbl) Excess Slurry Volume: 30.3 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 108.0 (bbd Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 10.70 (ppg) PV: 12.00 (cp) YP: 18.000 (Ibt7100ftO Viscosity: 49.00 (srgq Gels 10 Sec: B.000 (I01001P) Gels 10 Min: 11.000 (Ibf/100ft`) Additives Name Type Amount Units Concentration Unit D206 ANTIFOAM AGENT 0.100 GAUSX D065 DISPERSANT 0.500 %SWOC D600 G GAS -BLOCK 2.000 GAUSX D167 FLUID LOSS 0.110 % SWOC D177 RETARDER 0.050 GAUSX Printed 5/16/2019 2:52:52PM Printed 5/10/2019 2:52:52PM North America - ALASKA- BP Page 2 of 2 Cementing Report Common Well Name: NK -08 / 02 Report no.. 1 Report date: 4/10/2019 Project: Niekuk Site: NK Spud Date/Time: 7/14/7994 Event Type: RE-ENTER- ONSHORE (RON) Start Date. 3/22/2019 • EnoDe et 4/16/2019 AFE No X3 -0199E -C. (8,452,503.00 ) Contractor: PARKER DRILLING CO. Rig Name/No. PARKER 272 Rig Release: 4/22/2019 Active datum: ACTUAL KB P272 087.45usft (above Mean Sea Level) BPUOI: USA00001319 Fluid Tests Thick time Thick Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength (hr) temp. (%) temp. (cc/30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) ("F) (°F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) min(psi) `F min 4.75 0.00 80.00 28.0 158.001 1 stages Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom Plug" Flail Pressure Remms Circulate Cmt Vol to Total Annular no. (usft) (usft) Rate Press. Plug Plug I I Bumped Bumped Held Hem Prior Surface Mud Lost Flaw (gpm) (psi) (hr) (bbl) (bbl) After (psi) (min) I PRIMARYCENIENT 13,427.00 15,935.00 Y Y Y Y Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol SH circ. Bh static Pumped Disp. Rate TMD TMD Pmp date/time job Used temp. temp. (bbl) Rate (bbUmin) (usft) (usft) (scf) bbUmin Tete Casing Teel Shoe Test Liner Top Test Test Pressure: 4,000.00 (psi) FIT/LOT: (ppg) Liner Overlap: (usft) Time: 30 (min) Tool: N Positive Test: (ppg) Positive Teat Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Hrs Prior to Log: (hr) How Determined: Printed 5/10/2019 2:52:52PM Printed 5/16/2019 2:53.21 PM North America - ALASKA - BP Paps 1 of3 Cementing Report Common Wall Name: NK-08 / 02 - -- -- - Report no.. 1 Report date: 4/18/2079 Project Niakuk Site: NK Sputl Date/time: 7/14/1994 Event Type: COM- ONSHORE (CON) Start Date: 4/16/2019 End Date: 4/22/2019 AFE No.: - Contractor PARKER DRILLING CO. Rig Nama/No.: PARKER 272 Riq Release: 4/27!2019 X3-0199F-C: (3.071 363 00) BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45usft (above Mean Sea Level) General Information Job type: Primary Cement job start date/time: 4/18/2019 12:OOAM Job end date/time: 4/18/2019 2'.00AM Cement Company: SCHLUMBERGER Cementer: SHANE LOFGREN Cemented String: PRODUCTION LINER 1 String Size: 4.500 (in) String Set TMD: 19,856.00 (usft) Hole Size: 6.125 (in) Pipe Movement Pipe Movement: RECIPROCATING Rotating Time (Start-End): RPM'. Rotating Torque (inigavg/max): (ft-Ibf) Reciprocating Time (Start-End). Recip Drag Up/Down. - (kip) SPM: Stroke Length'. Pield9prrn: SPACER Fluids (1 of 2) Slurry Type: SPACER Purpose: SPACER Class: Description: MUD PUSH II Density. 12.00 (ppg) Yield'. Mix Water Ratio: Excess: Mix Method: BATCH Sacks Used: Water Volume: Excess Slurry Volume: 0.0 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 30.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type'. Density: 9.50 (ppg) PV: 0.00 (cp) YP: 0.000 (I1:4/100ft-) Viscoaity: 0.00 (S/qt) Gels 10 Sec: 0.000 (Ibf1100W) Gels 10 Min: 0.000 (Ibf/100111) Fluid Neuro: CEMENT Fluids (2 of 2) Sluny Type: CEMENT Purpose: PRIMARY Class: G-CLASS Description: TAIL SLURRY Density'. 15.80 (ppg) Yield: 1.1700 (M/sk) Mix Water Raba: 2.930 (gapak94) Excess: 30.00(%) Mix Method. Sacks Used: 460.50 (941b sacks) Water Volume: 32.1 (bbl) Excess Slurry Volume: 22.1 (bbp Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 96.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type'. Density: 9.50 (ppg) PV: 0.00 (cp) YP: 0.000 (Ibf/100ft-) Viscosity: 0.00 (s/qt) Gels 10 Sec: 0.000 (Ibf/t00R2) Gels 1a Min: 0.000 (Ibf/100fN) Printed 5/16/2019 2:53.21 PM Printed 5/16/2019 2:53:21 PM Paget of 3 North America - ALASKA - SP Cementing Report Common Well Name: NK-08 / 02 Report no.: 1 Report date: 4/18/2019 Project: NiakukSite: NK Spud Date/Time: 7H4H 994 Event Type: COM- ONSHORE (CON) Start Date: 4/16/2019 —? End Date. 1 22/2019 AFE No.: Contractor: PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rig Release: 4/22/2019 X3-0199F-C: (3,071,363.00 ) BPUOI: USA00001319 _ Active datum'. ACTUAL KB P272 @67 45usft (above Mean Sea Level) AddlBvse Name Type Amount Units Concentration Unit D206 ANTIFOAMAGENT 0.100 GAL/SX D047 ANTIFOAMAGENT 0.100 GAL/SX D065 DISPERSANT 0.600 %BWOC D600 G GAS-BLOCK 2.000 GAL/SX D167 FLUID LOSS 0.100 %BWOC D801 RETARDER AID 0.030 GAL/SX Fluid Teeb Thick time Thick Free rater Free water Fluid loss Fluid loss Fluid loss Camp Comp Camp Comp Comp Strength Comp Strength (hr) temp. (1) temp. (cc/30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 ("F) ("F) ('F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) min (psi) °F min 6.77 193.00 0.00 80.00 38.0 180.00 Stages Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom PlugPressure Float Pressure Returns Circulate Cmt Vol to Total Annular no. (usft) I (usft) Rate Press. Plug Plug dumped 9vrepad Hem Held Prior Surface Mud Lost Flow (gPm) (psi) (hr) (bbl) (bbl) After (psi) (min) 1 PRIMARY CEMENT 15,788.00 19,856.00 y y y y Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumped Disp. Rate TMD TMD Pmp date/time job Used temp, temp. (bbl) Rate (bbUmin) (usft) (usft) (scl) bbUmin Printed 5/16/2019 2:53:21 PM Printed 5/16/2019 2'.53'.21PM North America - ALASKA - BP Page 3 of 3 Cementing Report Common Well Name: NK -08 / 02 - — Report no.: 1 Report date: 4/18/2019 Project: Niakuk Site. NK Spud DateRime: 7/14/1994 Event Type: COM- ONSHORE (CON) Start Date: 4/16/2019 End Date: 422/2019 Rig Release: 4/22/2019 AFE No.: X3 -0199F -C: (3,071,363.00) Contractor PARKER DRILLING CO. Rig Name/No.: PARKER 272 BPUOI: USA00001319 Active datum: ACTUAL KB P272 @67.45us6 (above Mean Sea Level) Tasb Casing Test Shoe Test Liner Top Test Test Pressure: (psi) FIT/LOT: (ppg) Liner Overlap: (us6) Time: (min) Tool: N Positive Test: (PPg) Positive Test Tool: N Cement Found between Shoe and Collar. N Open Hole Length: (usR) Negative Test: (Ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usR) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Him Prior to Log: (hr) How Determined: Printed 5/16/2019 2'.53'.21PM THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY April 18, 2019 Ms. Katrina Gamer Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.alaslka.gov West Area Manager/Reservoir Management, Prudhoe Bay Unit Performance Manager Alaska Reservoir Development BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, Alaska 99519-6612 RE: Docket No. OTH-19-013 Request for waiver of the gas oil ratio limitations of 20 AAC 25.240(a) for well Prudhoe Bay Unit Niakuk NK -08B (PTD No. 217-154) Dear Ms. Garner: By letter dated April 9, 2019, BP Exploration (Alaska) Inc. (BPXA) requested a two-year waiver of the gas -oil ratio (GOR) limitations in 20 AAC 25.240(a) for the Prudhoe Bay Unit (PBU) well Niakuk NK -08B (NK -08B). BPXA's request is hereby GRANTED under the conditions below. The NK -08B, spudded on March 27, 2019, targets the Sag River Formation with the majority of the producing interval in the Raven Oil Pool (ROP). A portion of NK -08B will extend beyond the boundaries of the defined ROP. The ROP has a GOR waiver based on an ongoing enhanced oil recovery project in the field. However, the GOR waiver does not extend to the portion of the well that is outside of the defined pool boundaries. BPXA requests the GOR waiver to collect reservoir performance data in support of a probable future expansion of the ROP and to evaluate development of the Sag River Formation. BPXA requests a two-year waiver because the NK -08B well is a part of a larger ongoing evaluation of the Sag River Formation and expansion of the ROP that includes interpretation of newly collected seismic data across the area. Included in BPXA's assessment is a performance evaluation of the NK -14B well (PTD No. 217-005) that is also testing the Sag River Formation beyond the bounds of the ROP. Additional Sag River Formation appraisal wells may also be drilled to evaluate the formation and expansion of the ROP. BPXA's request under 20 AAC 25.240(b)(3) for a GOR waiver is granted on the following conditions: Ms. Katrina Garner April 17, 2019 Page 2 of 2 1) The NK -08B must be tested in accordance with the PBU's well testing and allocation procedures and be tested at least twice per month while flowing. 2) The GOR waiver expires at the end of the month two years from the date of first production. 3) On a quarterly basis, the operator must submit copies of all well tests for NK -08B showing the GOR. 4) Production from NK -08B will be allocated between the ROP and the Sag River Undefined Oil Pool based on the percentage of the completed interval that is on either side of the pool boundary. The field and pool code for the Sag River Undefined Oil Pool is 640165. 5) Prior to the expiration of this GOR waiver, and allowing for enough time to provide notice and hearing if necessary, the operator shall take steps to make this development compliant with 20 AAC 25.240(b)(1) or (2), or with 20 AAC 25.240(c). DONE at Anchorage, Alaska and dated April 17, 2019. Qg���p l Daniel T. Se ount, Jr. riehmielowski Commissioner oner TION AND APPEAL As provided in AS 31.05.080(a), within 20 days after written notice of the entry of this order or decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration of the matter determined by it. If the notice was mailed, then the period of time shall be 23 days. An application for reconsideration must set out the respect in which the order or decision is believed to be erroneous. The Commission shall grant or refuse the application for reconsideration in whole or in part within 10 days after it is filed. Failure to act on it within 10 -days is a denial of reconsideration. If the Commission denies reconsideration, upon denial, this order or decision and the denial of reconsideration are FINAL and may be appealed to superior court. The appeal MUST be filed within 33 days after the date on which the Commission mails, OR 30 days if the Commission otherwise distributes, the order or decision denying reconsideration, UNLESS the denial is by inaction, in which ease the appeal MUST be filed within 40 days after the date on which the application for reconsideration was filed. If the Commission grants an application for reconsideration, this order or decision does not become final. Rather, the order or decision on reconsideration will be the FINAL order or decision of the Commission, and it may be appealed to superior court. That appeal MUST be filed within 33 days after the date on which the Commission mails, OR 30 days if the Commission otherwise distributes, the order or decision on reconsideration. In computing a period of time above, the date of the event or default after which the designated period begins to run is not included in the period; the last day of the period is included, unless it falls on a weekend or state holiday, in which event the period runs until 5:00 p.m. on the next day that does not fall on a weekend or state holiday. ZE April 9, 2019 Commissioners Alaska Oil & Gas Conservation Commission 333 West 7' Avenue, Suite 100 Anchorage, AK 99501 BP Exploration (Alaska) Inc. 900 East Benson Boulevard PD Box 196612 Anchorage, Alaska 99519-6612 (907)561-5111 RE`rEFt- .-. APR 12 20119 AOGCC Re: Request for a waiver of the gas oil ratio limitations of 20 AAC 25.240(a) for well Prudhoe Bay Unit Niakuk 08-B (PTD #217-154). Dear Commissioners Chmielowski and Seamount, In accordance with 20 AAC 25.240(b)(3), BP Exploration (Alaska) Inc. (BPXA), as the Operator of the Prudhoe Bay Unit, requests a two-year (24 -month) waiver of the gas -oil (GOR) limitations of 20 AAC 25.240(a) for the above -referenced well. The basis of this request is to allow long-term testing of the Prudhoe Bay Unit Niakuk 08-B well (NK -08B), which will result in reservoir performance data that will help determine an optimum reservoir management program. The Niakuk 08B spudded March 27, 2019 and is expected to complete drilling on April 25, 2019, with a first production date as early as May 5, 2019. The Sag River Formation is the primary target with secondary potential in the Ivishak Formation; these are the Raven Oil Pool (ROP) reservoirs. The trajectory of the NK -08B includes the majority reservoir portion within the defined ROP, with a minority of the reservoir portion outside of the defined ROP. There is a possibility that the GOR in the wellbore will rise to twice the initial or higher; because there is no guarantee it won't rise this high, BPXA is erring on the side of caution and requesting a waiver. An enhanced recovery project operates in the pool from which the majority portion of the well will be producing; the requested waiver is due to the portion of the wellbore that is outside the pool but within the same hydrocarbon accumulation. Adjacent areas to the effective area of the ROP are being evaluated through the interpretation of the new North Prudhoe 3D seismic survey and via drilling (e.g. Niakuk 14B, and anticipated additional wells to NK -0813). It is anticipated the ROP will eventually be expanded to encompass surrounding productive acreage. The two-year duration of the waiver is requested because longer learnings from NK -0813, combined with learnings from NK -14B and the anticipated additional wells, will be necessary to fully define the area for the pool expansion. Any questions can be directed to the undersigned or to Bill Bredar at 564-5348, william.bredar@bp.com. Commissioners Chmielowsi, .td Seamount April 9, 2019 Respectfully, Katrina Garner West Area Manager/Reservoir Management, Prudhoe Bay Unit Alaska Reservoir Development, BPXA 564-4212 Cc: Jeff Farr, ExxonMobil Alaska, Production Inc. Jon Schultz, CPAI Dave White, Chevron USA Kevin Pike, Division of Oil & Gas THE STATE °fALASKA, GOVERNOR MIKE DUNLEAVY Kenneth Allen Engineering Team Lead BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission Re: Prudhoe Bay Field, Raven Oil Pool, PBU NK -08B BP Exploration (Alaska), Inc. Permit to Drill Number: 217-154 Surface Location: 1266' FSL, 1099' FEL, SEC. 36, T12N, R15E, UM Bottomhole Location: 419' FSL, 3297' FEL, SEC. 24, T12N, R15E, UM Dear Mr. Allen: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Enclosed is the approved application for the permit to redrill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, -0� Daniel T. Seamount, Jr. Commissioner DATED this Z od, ay f February, 2019. i r. k.R C 1 V t7 LJ JAN 2 5 2019 STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMIS' PERMIT TO DRILL 20 AAC 25 005 Is Type ofrn [ r b. Proposetl Well Class: Exploratory -Gas ❑ Service -WAG ❑ Service - Disp❑ 1c Specify if well is proposed for, Drill ❑ a rel agraphic Test ❑ Development - Oil 0• Service -Wnj ❑ Single Zone 0 Coalbed Gas ❑ Gas Hydrates Redrill 0 • Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket 0' Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 295705380 PBU NK -0813 ' 3 Address: 6. Proposed Depth. 12. Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-0612 MD: 19715' , TVD: 10114' ' PRUDHOE BAY, NW&W trOIL 2 • y3' yg 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): ADL 034630 & 034625 8. DNR Approval Number: 13. Approximate spud date: Surface: 1266' FSL, 1099 FEL, Sec. 36. T12N, R15E, UM • 4611' FSL, 227' FEL, Sec. 26, T12N, R15E, UM 84-062 March 1, 2019 Top of Productive Horizon: 9. Acres in Property: 2560 14. Distance to Nearest Property: 419' FSL, 3297' FEL, Sec. 24, T12N, R15E, UM Total Depth: 0 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 66.05 • feel 15. Distance to Nearest Well Open to Same Pool: Surface: x- 721466 , y- 5979798 - Zone - ASP 4 GL Elevation above MSL: 19.10 - feel 161 16. Deviated wells: Kickoff Depth: 10000 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 110 degrees Downhole: 4623 , Surface: 3612 18, Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weigh I Grade I Coupling Length MD I TVD MD TVD(including stage data &1177X9-1/4" 7" 26# L-80 VamTop HC 5935 9850' 6117' 15785' 9758' 453 sx Class'G' ✓ 6-1/8" 4-1/7 12.6# 1 13Cr85 VamTo 4080' 15635' 9632' 19715' 10114' 465 sit Class'G' 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft). Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 1 18517 9426 None 18429 9368 None Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20" 280 sx Arctic Set 34-114 34-114 Surface 5765 13-3/8" 1890 sx PF E. 375 sx Class'G' 33-5798 33-4137 Intermediate 12406 956" 400 sx Class'G', 185 BBIs AS 1 30-12436 30-7353 Production Liner 6281 7" x 4-1/2" 150 Bible Class'G' 12236-18517 7251 -9426 Perforation Depth MD (ft): 17970 - 18340 Perforation Depth TVD (ft): 9082-9311 Hydraulic Fracture planned? Yes ❑ No 0 , 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Huard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Nocas. Noel from without prior written approval. Contact Email Noel.Noces(o]bp.cem Aulhonzed Name Allen, Kenneth W Authorized Title Engineering Team Lead Contact Phone +1 9075645027 Authorized Signature CDate 2S Commissi Use Onl Permit to Drill ✓ Permit Approval See cover letter for other Number: 217-154 (RF! 9 8E%- API: 50- 029-22491-02-00 Date: requirements: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: d Onther�r�jc. r E 1 es'T �b -40X)' 'Z T Samples req'd. Yes ❑ No IN Mud log req'd: Yes ❑1 No aryr�JvS Lf-' '1'0 3 sz C ps 1 F H2S measures Yes L9( . No Directional svy req'd: Yes tP No 0 Spacing exception req'd: Yes f No Inclination -only svy req'd: Yes ❑ No /K1 ❑ ❑ '� ost initial injection MIT req'd: Yes No APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: Z,2O 1 I`J /"�W/� Fo & Revised 5/2017 This permit is valid for�4 Rhi Or tlle�e�(�roval (20 AAC 25.005(g)) r eAftemit o� and Duplicate �1 � .wVD by To: Alaska Oil & Gas Conservation Commission From: Noel Nocas, ODE Date: January 25, 2019 RE: NK -08B Permit to Drill The NK -08B well is scheduled to be drilled by Parker 272 in March 2019. This sidetrack well is a ✓ horizontal producer targeting the Sag River sands. The planned well is a two string sidetrack exiting the existing 9-5/8" casing, installing 7" intermediate liner, and installing 4-1/2" production liner. The intermediate liner will be set at the top of the Sag River, and the production interval will be completed with a solid liner that will be fully cemented. The maximum anticipated surface pressure from the Sag with a full column of gas from TO to surface is 3,612 psi (assumes 8.79 ppg EMW most likely pore pressure and a 0.1 psi/ft gas gradient). The well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3 rams and an annular). The BOP rams and annular will be tested to 4,000 psi. A detailed operations summary is included with the permit application. If there are any questions concerning information on NK -08B, please do not hesitate to use the contact information below. Noel Nocas Office: (907) 564-5027 Cell: (907) 229-9532 Email: noel.nocasCrilbp.com 'for reference the previous PTD contact was Nathan Sperry. Attachments: Well Bore Schematic BOPE Schematic Proposed Pre -Rig Schematic As -Staked Survey Proposed Completion Well Head Schematic Directional Package Tree Schematic NK -08B PTD 1 1/25/2019 Planned Well Summary Well NK -O88 Well Type Producer Target Sag Objective Current Status Shut-in Estimated Start Date: I3/1/2018 Surface Time to Complete: 1 34.1 Da s 1' FSL / 1099.2' FEL Planned KOP: 10,000' MD Planned TD: 19,715' MD / 10 046' TVDss Rig: Parker 272 GL -RT: 47.1 RTE ref MSL : 66.05 ' Directional — Baker WP04 KOP: I 10,000' MD Northing Easting TVDss Offsets TRS Tgt 1 5,988,290 716,894 9,769 669.0' FNL / 226.5' FEL 12N 15E Sec 26 TSAG Surface to 9,905' MD = GYRO Survey Program: 9,905' to 10,400'= BLIND 10,400' MD to TD = MWD+IFR+MS-WOCA Tgt 2 5,989,481 720,280 10,048 419' FSL / 1983' FEL 12N 15E Sec 24 TD Planned KOP: 10,000' MD Planned TD: 19,715' MD / 10 046' TVDss Rig: Parker 272 GL -RT: 47.1 RTE ref MSL : 66.05 ' Directional — Baker WP04 KOP: I 10,000' MD Maximum Hole Angle: —640 in the intermediate section —1100 in the production section None. All offset wells pass BP anti -collision scan criteria, but some offsets Close Approach Wells: must be shut-in to pass scan criteria. Reference "Subsurface and Anti - Collision Issues' section. Surface to 9,905' MD = GYRO Survey Program: 9,905' to 10,400'= BLIND 10,400' MD to TD = MWD+IFR+MS-WOCA Nearest Property Line: 0' — The well straddles the Raven Pool Boundary✓ Nearest Well within Pool: —2,161' NK -08B PTD 2 1/25/2019 Formation Tops and Pore Pressure Estimate (SOR) Form. Depth (TVDss) Pore Pressure (Ppg) Frac Gradients ► UG1 5974 9.1 13.54 KOP 6118 9.1 13.56 OA 7001 9.1 13.69 CM3 7197 10 14.18 CM2 8480 10.1 14.42 CM1 8678 10.5 14.65 THRZ 8909 10.5 17.55 Kuparuk 9133 8.79 13.84 TKNG 9338 10.4 17.61 TSGR 9692 8.95 13.98 TSHU 9785 8.81 17.21 TSAD 9858 8.82 13.93 Ivishak Z4 10000 8.75 13.92 NK -08B PTD 3 1/25/2019 Casing/Tubing Program Hole Size Liner / Tbg O.D. WUFt Grade Conn Length Top MID /TVDss Bottom MD/TVDss 8-1/2" x 7" 26# L-80 VamTop HC 5,935' 9850' / 6,051' 15,785' / 9,692' 9-1/4" 1 20-30 1 <5 1 <10 <20 8.5-9.5 (150' la ) 6-1/8" 4 W 12.6# 13Cr VamTop 4,080' 15,635'/ 9,566' 19,715'/ 10,048' (150' la Tubing 4 %' 12.6# 13Cr VamTop 15,640' Surface 15,640' / 9,570' (-5' into liner TBS) Mud Program Intermediate Mud Properties: LSND Polymer Fluid 6-1/8" Hole Section 9-1/4" Hole Section Depth Interval Density PV (cp) lb/P API FL HTHP FL MBT pH 10,000' MD — 12,426' MD CM3 9.4 — 10.5 10-15 1 20-30 1 <8 1 NA <20 8.5-9.5 12,426' MD — 15,785' MD 1 10.3 — 11.5 .1 10-15 1 20-30 1 <5 1 <10 <20 8.5-9.5 ProductionMud Properties: Water Based Polymer Fluid 6-1/8" Hole Section Depth Interval Dens(PPg) PV (cp) Ib/'IOOftz API FL HTHP FL MBT pH 15,785' M D - TD 1 9.1 —9. <8 12-20 <12 NA <4 8,5-9,5 Logging Program 8-112" x 9-1/4" Intermediate Sample Catchers — as required by Geology Drillin : Dir/GR/RES Oen Hole: None Cased Hole: None 6.118" Production Sample Catchers —asrequired bGeology Drillin Dir/GR/RES/NEU/DEN Oen Hole: I None Cased Hole: I None NK -08B PTD 4 1/25/2019 Cement Program Casing Size 7" 26# L-80 mTop Intermediate Liner Lead N/A Close Lead TOC N/A Basis Tail Oen hole volume + 30% excess + 80 ft shoe track Tail TOC 1300 ft MD above Top Ku aruk Spacer -40 bbls of Viscosified Spacer weighted to -12.0 Mud Push II Total Cement Lead N/A Volume Tail 93.8 bbls, 526 cuft, 453 sks 15.8 lb/gal Class G - 1.16 cuft/sk cement. Collision with NK -02 would not create an HSSE hazard. Temp BHST201°F Casing Size 4-1/2" 12.6# 13Cr VamTop Production Liner Lead N/A Close Lead TOC N/A Basis Tail Open hole volume + 30% excess + 80 ft shoe track + 150' liner lap + 200' of 4" DP by 7" liner annulus Tail TOC Top of the liner Spacer -20 bbls of Viscosified Spacer weighted to -11.0 Mud Push II Total Cement Lead N/A Volume Tail 96.3 bbls, 539 cult, 465 sks 15.8 lb/gal Class G - 1.16 cuf /sk cement. Collision with NK -02 would not create an HSSE hazard. Temp BHST 206° F Surface and Anti -Collision Issues Surface Close Proximity: No wells will be affected by the Parker 272 rig shadow. Anti -Collision: Ail offset wells pass BP anti -collision scan criteria. The following table details the wells that fail major risk and how the risk will be mitigated. Offset well ownership information All offset wells identified within 200 ft of the proposed wellbore are operated by BP. / NK -08B PTD 5 1/25/2019 Interval of Well Close Risk Basis Offset Well Details Name Approach - NK -02 and all of its laterals have been permanently abandoned with NK -02 Intermediate 1/200 cement. Collision with NK -02 would not create an HSSE hazard. - NK -02 and all of its laterals have been permanently abandoned with NK -02A Intermediate 1/200 cement. Collision with NK -02 would not create an HSSE hazard. - NK -02 and all of its laterals have been permanently abandoned with NK-02APB1 Intermediate 1/200 cement. Collision with NK -02 would not create an HSSE hazard. - NK -11A was sidetracked in 2002. The sidetrack experienced multiple NK -11A Intermediate 1/200 issues and the well was T&A'd with cement. Collision with NK -11A would not create an HSSE hazard. - NK-11APB1 is an open hole plugback that was created when NK - NK -11 APB1 Intermediate 1/200 11A was sidetracked. Collision with NK-111APB1 would not create an HSSE hazard. - NK -12A was sidetracked to NK -12B in 2004. NK -12A was P&A'd as NK -12A Intermediate 1/200 part of the NK -12B sidetrack prep. Collision with NK -12A would not create an HSSE hazard. Offset well ownership information All offset wells identified within 200 ft of the proposed wellbore are operated by BP. / NK -08B PTD 5 1/25/2019 Hydrogen Sulfide T NK is considered an 1-12S site. Recent H2S data from the pad is as follows: Faults Formation Where Fault Encountered Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level NK -29 70 07/29/2017 #2 Closest SHL Well H2S Level NK -28 0 10/06/2000 #1 Closest BHL Well H2S Level NK -14B 50 07/09/2017 #2 Closest BHL Well 1-12S Level NK -38B 50 07/08/2017 #3 Closest BHL Well 1-12S Level NK -43 0 05/06/2001 #4 Closest BHL Well 1-12S Level NK -08A 50 07/05/2017 Max Recorded 1-12S on Pad/Facility NK -62A 750 1/16/2006 Faults Formation Where Fault Encountered MD Intersect TVDss Intersect Throw Direction and Ma nitude Lost Circ Potential Fault #1 17,453' 9,800' 20-30 feet DTN Low Drilling Waste Disposal • There is no annular injection in this well. ' • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class 11 wastes to DS -04 for injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB Environmental Advisors (659-5893) for guidance. NK -08B PTD 6 1/25/2019 Well Control The 8-1/2" x 9-1/4" hole section will be drilled with well control equipment consisting of 5,000 psi working pressure rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 4,000 psi. BOP test frequency for NK -08B will be 7 days until the window is milled and then will be 14 days with function test every 7 days. Except in the event of a significant operational issue that may affect well integrity or pose safety concerns, an extension to the 14 -day BOP test period should not be requested. 8-1/2" x 9-1/4" Intermediate Interval Maximum anticipated BHP 4,536 psi in the Sag at 9,758' TVD 8.94 ppg EMW Maximum surface pressure 3,560 psi at the TSGR 0.10psi/ft gas gradient to surface Kick tolerance 25 bbls with 11.9 ppg frac gradient. Kick tolerance Assumes 8.94 ppg pore pressure in the SGR + 0.5 ppg kick Integrity Test — 6-1/8" hole intensity and 10.7 ppg MW. 4-1/2" Liner Top Packer Rams test to 4,000 psi / 250 psi. Planned BOP test pressure Annular test to 3,500 psi / 250 psi Integrity Test — 9-1/4" hole LOT after drilling 20'-50' of new hole 9-5/8" Casing Test 4,000 psi surface pressure 6-1/8" Production Interval Maximum anticipated BHP 4,623 psi at TO in the Ivishak at 10,114' TVD 8.79 ppg EM Maximum surface pressure 3,612 psi at TD 0.10psi/ft gas gradient to surface / Kick tolerance Greater than 25bbls with >9.8 ppg frac gradient. Assumes an 8.79 ppg max pore pressure in the Ivishak + 0.5 ppg kick intensity and 9.2 ppg MW. Planned BOP test pressure Rams test to 4,000 psi / 250 psi. Annular test to 3,500 psi / 250 psi Integrity Test — 6-1/8" hole FIT after drilling 20'-50' of new hole 4-1/2" Liner Top Packer 4,000 si surface pressure Planned completion fluids —9.8 ppg brine 12,000 It TVD diesel NK -08B PTD 7 1/25/2019 Drill and Complete Operations Summary Pre -rig Work Step Service Line Description of Work 1 F P&A perfs with cement. Minimum TOC is 1300' MD above the top of the Ku aruk est. TOC at 16,675' MD). 2 S D&T TOC. Drift for jet cut. 3 E Run MTT log to determine 9-5/8" collar locations. 4 D Inflow test. 5 E Jet Cut TBG -10,000' MD. Planned KOP is -10,000' MD. 6 F A/SL: CMIT-TxIA 4000 psi. 7 S Set hold open sleeve. 8 D PPPOT-T and IC. Function LDS. 9 V Install Dry Hole Tree. Install Annulus Valves. Proposed Drilling Operations 1. MIRU Parker 272. 2. Nipple down tree. Nipple up BOPE and test to 4,000 psi. (Configured from top to bottom: 13- 5/8" annular preventer, 2-7/8" x 5" VBRs in the upper cavity, blind/shear rams, mud cross and 2-7/8" x 5" VBRs in the lower cavity). a. Test rams to 250 psi / 4,000 psi, Annular to 250 psi / 3,500 psi with 4" and 5" test joint. b. Notify AOGCC 24 hrs in advance of full test. 3. RU hard lines to BOP. Circulate out diesel freeze protection and displace well to clean seawater. 4. Pull tubing from the pre -rig cut. 5. Optional: Perform 9-58" cleanout run to tubing stub. 6. Change IC packoff (FMC). 7. PU 9-5/8" whipstock, bottom trip anchor, and 8-1/2" window milling assembly (to include full gauge string mills). RIH to top of tubing stub, orient, and set whipstock at 10,000' MD. 8. Swap wellbore over to 9.5 ppg LSND milling fluid. Drill 8-112" x 9-1/4" Intermediate Hole 9. Mill window in 9-5/8" casing plus 20'-50' (depending on next assembly) of new formation. 10. Pull into the window and perform LOT. Minimum LOT required is 11.9 p g EMW for 25 bbl kick t to erance. I Wk, a7- t) A -f F -TI) -T- yJ 1 (G r 1 4r L 11. Pull out of the hole for drilling BHA #1. r—C �>_Ak _ � t c -;r_ r -a \� 5 VmL-W-tG- 12. MU 8-1/2" motor assembly and drill until three consecutive clean surveys are obtained. P '> f-- t C� 13. Pull out of the hole. Make up 8-1/2" x 9-1/4" drilling RSS BHA #1 w/ MWD/RES/PWD/near-bit GR and RIH. 14. Kick off and drill 8-1/2" x 9-1/4" intermediate interval per the directional plan to TSGR TO of ^15,785' MD. 15. At TD, circulate until wellbore is clean. 16. Perform short trip to the window (if needed based on hole conditions). 17. Run in the hole to TD, circulate the wellbore clean and pull out of the hole on elevators. Run & Cement 7" Intermediate Liner NK -08B PTD 8 1/25/2019 18. Change upper 2-7/8" x 5" VBRs to 7" fixed rams and test to 250 psi low / 4,000 psi high for 5 min each. 19. Run 7", 26# L-80, VamTop HC liner to TD, with 150' liner lap into 9-5/8" window. 20. Cement liner with 15.8 ppg Class G tail cement. Plan for TOC to be 1,300' above TKUP. 21. Set liner top packer and liner hanger. Pull out of the hole and lay down the liner running tool. 22. Change upper 7" fixed rams to 2-7/8" x 5" VBR's and test to 250 psi low / 4,000 psi high for 5 min each. 23. Test 7" liner to 250 psi low for 5 min / 4,000 psi high for 30 min after cement has reached a minimum NOD nsi cmmnmssive strenoth_ Drill 6-1/8" Production Hole Section 24. Make up the 6-1/8" drilling BHA with MWD/GR/RES/DEN/NEU and RIH. 25. Run in the hole and tag landing collar. 26. Displace wellbore to 9.2 ppg QuikDril-N. 27. Perform a flowcheck on 7" liner (no flow test). 28. Drill shoe track and 20 ft of new formation. Pull above shoe and perform FIT. Minimum F T 1 XYZ required is 9.8 ppg EMW for>25bbls KT. r CT b)d,-r -Iu 40C+GC >�C� 29. Drill 6-1/8" production interval per the directional plan to TD of -19,715' MD. 30. At TD, circulate until the wellbore is clean. / 31. Perform short trip to the shoe. 32. Run in to TD, circulate the wellbore clean and pull out on elevators. 33. Lay down excess drill pipe and BHA. Run 4-1/2" Production Liner & Perforate 34. Run 4-1/2", 12.6 ppf, 13Cr, VamTop production liner to TD with 150 ft liner lap into 7" casing. 35. Fully cement the liner. 36. Set liner hanger and liner top packer. 37. Displace wellbore to clean 9.2ppg brine above the top of the liner. 38. Pull out and lay down the liner running tool. 39. Pressure test 9-5/8" casing x 7" liner x 4-1/2" liner envelope to 250 psi low for 5 min / 4,000 psi high for 30 min. 40. Run in and perforate liner. Perforate with HES 2-7/8" MaxForce pert guns (1,600' planned). Run 4-1/2" Completion 41. Rig up and run 4-1/2", 12.6# 13Cr VamTop completion per the tally. Tag up in PBR, space out, and land tubing hanger. Run in the lockdown screws. 42. Displace tubing and IA to clean 9.8ppg brine. 43. Reverse circulate in heated brine and inhibited brine to IA and tubing (surface to surface). 44. Drop ball & rod and set production packer. Individually test tubing and IA to 250 psi low for 5 min / 4,000 psi high for 30 min. 45. Hold pressure on the IA and bleed tubing pressure down to shear the DCR valve. Pump both ways to confirm circulation ability. 46. Reverse circulate in diesel freeze protect down IA using rig's injection pump to freeze protect IA and tubing to BPRF. NK -08B PTD 9 1/25/2019 47. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm well is dead. ND/NU 48. Install TWC and test from above and below to 250 psi low / 4,000 psi high for 5 minutes each. 49. Nipple down the BOPE. Nipple up the adapter flange and double master valves. Test to 250 psi / 5,000 psi for 5 minutes each with diesel. 50. Ensure Heet is left on top of TWC and only diesel is left in the tree. 51. Install all annulus valves and secure the well. Release Rig 52. Rig down Parker 272. 53. Move rig off location. Post -Rig Operations 1. Change out dry hole tree for production tree. 2. Pull TWC, ball and rod, and RHC plug. Pull shear valve and install GLVs. 3. Flowback, per ASRC. 4. Install flow lines and well house. NK -08B PTD 10 1/25/2019 NK -08B Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures A. Intermediate Hole: The formation pressure at the KOP is expected to be 9.1ppg. The formation pressure will be controlled with a 9.4 — 10.5ppg. The CM3, CM2 and CM1 are expected to be at 10.0 to 10.5 ppg EMW. Formation pressures will be controlled with a 10.5 — 11.5 ppg mud weight. C. Production Hole: The Sag is expected to be at an 8.94 ppg EMW. Reservoir pressures will be controlled by using 9.1 — 9.8 ppg water-based mud. II. Lost Circulation/Breathing A. Intermediate Hole: There are no expected fault crossings in the intermediate hole. However, breathing has been known to occur in the Colville on other Drill Sites in Prudhoe Bay as a result of high ECD's. B. Production Hole: There is 1 expected fault crossing in the production hole with a low risk of lost circulation. III. Fault Locations Formation Where Fault Encountered I MD Intersect TVDss Intersect Throw Direction and Magnitude Lost Circ Potential Fault #1 17,453' 9,800' 20-30 feet DTN Low IV. Integrity Testing Test Point Test Depth Testtype EMW (lb/gal) 9-5/8" Window 20'-50' from the 9-5/8" shoe LOT 11.9 ppg 7" shoe 20'-50' from the 7" shoe FIT 9.8 ppg NK -08B PTD 11 1/25/2019 V. Hydrogen Sulfide / NK is considered an H2S site. Recent H2S data from the pad is as follows: VI. Anti -Collision Issues Y None. All offset wells pass BP Anti -collision Scan Criteria. CONSULT THE NK PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. NK -08B PTD 12 1/25/2019 Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level NK -29 70 07/29/2017 #2 Closest SNL Well H2S Level NK -28 0 10/06/2000 #1 Closest BHL Well H2S Level NK -14B 50 07/09/2017 #2 Closest BHL Well H2S Level NK -38B 50 07/08/2017 #3 Closest BHL Well H2S Level NK -43 0 05/06/2001 #4 Closest BHL Well H2S Level NK -08A 50 07/05/2017 Max Recorded H2S on Pad/Facility NK -62A 750 1/16/2006 VI. Anti -Collision Issues Y None. All offset wells pass BP Anti -collision Scan Criteria. CONSULT THE NK PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. NK -08B PTD 12 1/25/2019 13-3/8" CSG, 68#, N-80, NSCC, D = 12.415' H 5805' Minimum ID = 3.725" @ 12329- 4-1/2" HES XN NIPPLE 1/2" TBG, 12.6#, L-80 BT -M, D= 3.958" 1H 12342' LW 29#, ? HV D 511, .0371 bpf, D = 6.184" H 12343' TOP OF 4-12' LNR Pf31FORATDN SUIN WARY ....FARC ELLFEAD= NDte: Refer to Roducbon DB for Nstorical pert data CTUATOR= BAKER KB. B -EV = 60.8' 3= fiEV = 5283' _. ELEV = 22.1T 2-12' 6 ax Angle = 78° @ 14657 etum MD= 18248' 1tum TVD = 9200'SS 13-3/8" CSG, 68#, N-80, NSCC, D = 12.415' H 5805' Minimum ID = 3.725" @ 12329- 4-1/2" HES XN NIPPLE 1/2" TBG, 12.6#, L-80 BT -M, D= 3.958" 1H 12342' LW 29#, ? HV D 511, .0371 bpf, D = 6.184" H 12343' TOP OF 4-12' LNR Pf31FORATDN SUIN WARY REF LOG: SVS Mf3AJRY GR/CCL ON 04/06/01 ANGLEAT TOP : 52' @ 17970' NDte: Refer to Roducbon DB for Nstorical pert data ME SPF MH2VAL Opn/Sqz DATE 2-1/2" 6 17970-18070 O 04/06/01 2-12' 6 18090 - 18130 O 04/06101 2-1/2' 6 18150-18230 O 04/06101 2-12' 6 18240-18300 O 04/06/01 2-12' 6 16315-18340 O 04/06/01 NK0 8 A WELI GLE> 70" @ 12666'. OLD 5-112" LNPoPEWS P&A'L ..AE NDT SHOM ON OAGRAM. 203T 4-12' HES FMX TRSSSV NP, D= 3.813" GAS LFT MANDRELS ST TTVD LATE REV BY DEV TYPE VLV LATCH PORT DATE 3 3572 3033 5516 4-12' WLEG, D= 3.958" DOWE RK 16 0422!1 2 8403 5433 61 =M DOME RK 16 042211 1 12198 7232 59 MMGM SO RK 24 04/22/1 { 1223W —j 9-518" X 7- BKR ZXP PKR D = 7.500" 12253' H 9-5/8' X 7' BKR HYD LNR HGR D = 6.276" 12264' 1-14-12" HES X NP, D = 3.813" LATE REV BY 12285' 08/31/94 7- X 4-1/2' BAKER S-3 FKR D = 3.875" 02/18/11 MB/JMD ADDED SSSV SAFETY NOTE 12308' 4-12' HES X NP, D = 3.813' 12329' 4-12' HTS XN NP, ID= 3.725' 12342' 4-12' WLEG, D= 3.958" CSG DEPTH &WEISOOF/FZ:0 ELMD TT NOT LOGG® 12343' 7- X 4-12' XO. D = 3.938' 9-5/8' MLLOIJT WIDOW TOP @ 12436' WFiPSTOCK SET ON TOP OF CBP 12462' 9-518" CIBP - SET 03122/01 1111111low 4-12- LNR 12.6#, L-80, HYDRL 521, .0152 bpf, D = 3.918' DATE REV BY COMMENTS LATE REV BY ODWAE 4TS 08/31/94 ORIGINAL COMPLETION 02/18/11 MB/JMD ADDED SSSV SAFETY NOTE 04/00/01 RIG SIDETRACK (W -08A) 05104/12 KERCMD GLV GO (0422/12) 10/17/04 GRC/TLHOORRCLTI(N4S 05/04/12 JMD CSG DEPTH &WEISOOF/FZ:0 10/09105 RPWTLH WAIVER SFTY NOTE DR ETE1 0921/17 JNJJMD ADDED OKB, REF, & BFE 09/08/06 CS(PJC TVD/MD DATUM 01/04/07 GJF/TLH GLV CIO (12r26106) NAKUK U4fT WELL: W -08A PERIW W: "1010290 API N1: 50-029-22491-01 SeC 36, T12K R75E, 1266' NSL, 1099' WEL BP Exploration (Alas kal ELLHEAD= - - -'-FMC CTUATOR= BAKER -_. 3. ELEV = 52.83' _. ELEV = 19.6' DP= 900' ax Angle = 78" 14652' tum MD = 18248' .film TVD= wrin, cS JMrC111wI1 Ca). �V vii��"an "s"aJ NK0 8A WELIG T LE> 70° @ 12666'. OLD 5-1/2" LM4PERFS P&A', .ATE NOT SHOWN ON DIAGRAM. 13-3/8" CSG, 68#, N-80, NSCC, D = 12.415" 5808' J Cut tubing at 10,000MD Top of 9-5/8" cement est. @ 12,073' MD (30% washout) Minimum ID = 3.725" @ 12329' 4-1/2" HES XN NIPPLE 14-1/2- TBG, 12.6#, L-80 BT -M, ID = 3.958" 1 LNR, 29#, ?HYD 511, .0371 bpf, D = 6.184" 1-1 12343' 4-1/2" LNR PERFORATION SLWAMRY REF LOG: SWS NA30IDRY GP/OCL ON 04/06/01 ANGLE AT TOP PEW: 52' (@ 17970' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 6 17970-18070 S 04/06101 2-1/2" 6 18090 - 18130 S 04/06/01 2-1/2" 6 18150-18230 5 04/06/01 2-1/2" 6 18240-18300 S 04/06/01 2-1/2" 6 18315- 18340 S 04/06/01 12462' 9-5/8" CIBP- SET 03/22/01 `_J 4-1/2" HES FMX TRSSSV NP. ID= 3.813" I GAS LFT MANDRELS ST MD TVD DEV I TYPE I VLV LATCH PORT DATE 3 3572 3033 55 MMG-M Dumnry RK 16 04122/1 2 8403 5433 61 MMGM Dummy RK 16 04/22/1 1 12198 7232 59 MMGM Dummy RK 24 04/22/1 OA downsqueeze 3000' to 6097' MD 12236' 9-5/8" X 7" BKR ZXP PKK D = 7.500- 9 -5/8"X .500"9 -5/8"X 7" BKR HYD LNR HGR D = 6.276" 12264' 4-1 /2" HES X NP, U= 3.813" 12285' 7" X 4-1/2" BAKER S-3 PKR, ID = 3.875" 12308' 4-112" HES X NP, D = 3.813" 12329' 4-1/2" HES XN NP, ID = 3.725" 12342' 4-1/2" WLEG, D=3.958" B.MD TT NOT LOGGED 12343' 7"X 4-1 Y2" XO, D = 3.938" 9-5/8" MLLOUT V4 4DOW TOP @ 12436' Top of 4-1/2" annulus cement to 16,254'w/ 30% washout (4/2/01) Pre -rig TOC to 16,675' MD minimum PBTD H 18429' 4-1/2" LNR 12.69, L-80, HYDRL 521, I 18517' .0152 bpf, D = 3.918" DATE REV BY CORNV194TS DATE REV BY COKMARM 08/31/94 ORIGINALCOMPLETION 02/18111 NB/JMD ADDEDSSSV SAFETY NOTE 04109101 RIG SIDErRACK(NK-08A) 05/04/12 NBMJMD GLV GO (04/22(12) 10/17/04 GRC(TLH CORRECTIONS 05/04112 JMD CSG DEPTH 8 WBS CORl;U I 10/09/05 RPI -MH WAIVER SFTY NOTE DELETED 08/24/17 NS Proposed Re-% 09/08/06 CS/PJC TV D' MD DATUM CORRECTUNK 01/04/07 GJF/TLH GLV C/O (12/26106) NIAKLK UNIT' WELL: NK -08A PE RMT No: '2010290 AR No: 50-029-22491-01 SEC 36, T12K R15E; 1266' NSL, 1099' WEL BP Exploration (Alaska) 6 5 4 = 12.415" 5806' 3 2 1 STOP OF 7" LNR 9860 1=-14-1/2- -9-5/6" X 7- LTP w / HGR. D = _- Minimum ID =_" � ' FES X N,D3 NSCC, D = 8.681' H —10000- 4-1/2" TBG, 12.6#, 13 -CR VA TOP, .0152 bpf, D = 3.958' TOP OF 4-1/2" LNR N'Pf)e — �ke� 1s64o• \ 16635' LNR, 26#, L-80 VT HC, .0383 bpi, ID= 6.276' 1b786' PERFORATION SLXVW RY _ PROPOS T) NK08B O :t DNr=1 i WBA PBA'L _ LNR 2000' ISTI ND NU I M: W=LL K=WU/K=J R aaa V. 'GLE>70'@ '.OLD5-112-LNRIPEiFS ..iE NOT SHOWN ON DIAGRAM. CHROME TBG & 4-12^ scssv NP, D = _' GAS LFT MANDRILS I TVD1 DEV1 TYPE I VLV LATCH PORI DATE ELLFEAD = Fc C LIATOR= BAKER 3. E LBf = 52.83' F. ELEV= 19.9 DP= 900 axAngl= _" @ 3tn,...TumMDrn MD = at , .vn= o7nn �_ci 6 5 4 = 12.415" 5806' 3 2 1 STOP OF 7" LNR 9860 1=-14-1/2- -9-5/6" X 7- LTP w / HGR. D = _- Minimum ID =_" � ' FES X N,D3 NSCC, D = 8.681' H —10000- 4-1/2" TBG, 12.6#, 13 -CR VA TOP, .0152 bpf, D = 3.958' TOP OF 4-1/2" LNR N'Pf)e — �ke� 1s64o• \ 16635' LNR, 26#, L-80 VT HC, .0383 bpi, ID= 6.276' 1b786' PERFORATION SLXVW RY RET LOG: SWS MEAURY GWCCL ON 04/06/01 ANGLEAT TOP PERF: 52" @ 17970' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 04/09101 RIG SIDETRACK(NK-08A) _I_/_ RIG SIDETRACK (NK -08B) 2" LNR, 12.6#,13 -CR, VAM TOP, 52 bpf, D = 3.958" 7" X 4-1/2' BAKER S-3 PKR, D = 4-1/2" FES X NP, D = 3.813" 14-1/2" HES XN NP. 10 = 3.725" 1 MLLOUT WINDOW (NK -06A) 10000-- 14-112" 0000'- I4-12" %ALEG, D= 3.958" SMD TT NOT LOGGED NIAKU( 11NIT WILL: W -08B PERMFT No: AR No: 50.029-22491-02 SEC 36, T12K R15E, 1266' NSL, 1099' WEL DATE REV BY COM I31ITS DATE REV BY COMVB•fTS 08/31194 ORIGINAL COMPLETION 04/09101 RIG SIDETRACK(NK-08A) _I_/_ RIG SIDETRACK (NK -08B) 08129117 JMD BUILT PROPOSED BP 13roloration IAlaskal �yb 1 rv1,u NK -09 9N� \ \K 27 m NK -0] NK -07A NK -11A , NK-11APB1 4K -08B Plan @,66.O5usX (P272 PLAN) N"K 13 Pro(eol: Nlakukftp.1 o. A-- WELLBORE DETAILSPlan NK4]8B r&FEHExcE esaawrn>H Co-a3mmlN4)Mkmu f-1 See: NK wtp. Fw- NK -08 toolp I" Well: NK41B soa-an•nasw,dii 7e an MD' 9905.25 WaBNan@66 vefvs)lbieeu. Na �6605iefl(P211 NAM WNlbon. PIan NK4MB NK-1 )8 AWN HE) OOft MD Plan: NK.08BWP04 Plus 600X MD �'i u,msssuane��raven ,0088 y DNAp. NNdBB Wen IM72RN0 NK -388 WAg3 y�i�,„,cu�mue �yb 1 rv1,u NK -09 9N� \ \K 27 m NK -0] NK -07A NK -11A , NK-11APB1 4K -08B Plan @,66.O5usX (P272 PLAN) N"K 13 NK -38A NK -65 2 ¢ zjl NK -65A NK-1 )8 04 Plus OOft MD opp u00 B 6000 Nn -14U NK -15 NONP71 000 NK-OBB WP04 Plus 5 MD 82 NK -086 WP04'., Easting (500 usNin) BBDO NK -15A NK -16 NK -38 g NK -38A NK -65 9941 NK -65A 10006 )8 04 Plus OOft MD ,0088 NK -388 8ppu m T-38APB1 8000 8000 $ $ 90000 °� oo o NK-62APB1 o gpp �O BODO o B 62 0 epp NK -62A Easting (500 usNin) BBDO NK -15A NK -16 NK -38 g North America - ALASKA - BP Niakuk NK NK -08 Plan NK -08B NK -08B WP04 Plus 500ft MD AOGCC Offset Well Report 20 December, 2018 Company: North America - ALASKA - BP Project: Niakuk Reference Site: NK Site Error: 0.o0usft Reference Well: NK -08 Well Error: 0.00usft Reference Wellbore Plan NK -08B Reference Design: NK -08B VVP04 Plus 500ft MD BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well NK -08 NK -08B Plan @ 66.05usft (P272 PLAN) NK -08B Plan Q 66.05usft (P272 PLAN) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference NK -08B WP04 Plus 500ft MD Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria To Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Trev. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic Survey Tool Program Date 1220/2018 From To Offset Centre to (usft) (usft) Survey (Wellbore) Tool Name Description 105.25 9,905.25 1 : Gyrodata gyrocompassing m/ (NK -08) GYD-GC-MS Gyrodata gyrocompassing m/s 9,905.25 10,400.00 NK -08B WP04 Plus 500ft MD (Plan NK -08 BLIND Blind drilling 10,400.00 15,692.00 NK -08B WP04 Plus 500ft MD (Plan NK -08 MWD MWD- Standard 10,400.00 15,692.00 NK -08B WP04 Plus 500ft MD (Plan NK -08 MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 15,692.00 20,215.40 NK -08B WP04 Plus 500ft MD (Plan NK -08 MWD MWD- Standard 15,692.00 20,215.41 NK -08B WP04 Plus 500ft MID (Plan NK -08 MWD+IFR+MS-WOCA MWD +IFR+Multi Station W/O Crustal Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) NK NK -07 - NK -07 - NK -07 457.20 450.00 31.79 NK -07 -NK -07A -NK -07A 463.14 450.00 31.90 NK -08 - NK -08 - NK -08 10,228.40 10,225.00 18.54 NK -08 - NK -08A- NK-OaA 10,211.73 10,200.00 16.08 NK -08 - Plan NK -08B - NK -08B WP04 19,715.41 19,715.41 0.00 NK -09 - NK -09 - NK -09 755.84 750.00 25.12 NK -10 -NK -10 -NK -10 834.43 825.00 58.20 NK -11 - NK -11 - NK -11 855.88 850.00 86.54 NK -11 -NK-11A-NK-11A 11,609.76 12,800.00 125.03 NK -11 - NK-11AP81 - NK-11APB1 11,609.76 12,800.00 125.03 NK-11-NK-11PS1-NK-11PB1 855.88 850.00 86.54 NK -11 - NK-11PB2 - NK-11PB2 855.88 850.00 86.54 NK -12 - NK -12 - NK -12 683.53 675.00 118.83 NK -12 -NK -121 -NK -12A 1516480 1445000 11156 NK -12 - NK -12B - NK -128 691.75 675.00 118.96 NK -12 - NK -12C - NK -12C 691.75 675.00 118.96 NK -13 - NK -13 - NK -13 905.38 900.00 139.37 NK -14 - NK -14 - NK -14 930.47 925.00 170.44 NK -14 -NK -14A -NK -14A 930.47 925.00 170.44 NK-14-NK-14APB1-NK-14APB1 930.47 925.00 170.44 NK -14 -NK -14B -NK -14B 923.02 925.00 170.34 NK -27 - NK -27 - NK -27 630.27 625.00 53.74 NK -28 - NK -28 - NK -28 605.71 600.00 17.54 NK -28 - Plan NK -28A- NK -28A WP07 Prelim 624.43 625.00 17.87 NK -29 - NK -29 - NK -29 730.34 725.00 13.06 NK 01 Island 12202018 9:3009AM Page 2 of 2 COMPASS 50001 Build 81D by North America - ALASKA - BP Niakuk NK NK -08 Plan NK -08B Plan: NK -08B WP04 BP Well Plan Survey Report 20 December, 2018 lett Niakuk, GPMA, NIAKUK t System: Alaska NAD27 State Plane Zones - System Datum: Mean Sea Level t Datum: NAD27' OGP-Usa AK [4267'158641 Using Well Reference Point r Zone: NAD27' OGP-Usa AK I Alaska zone 4 [26734.1586, Using geodetic scale factor site NK, TR -12-15 BP by Map BP Well Plan Survey Report 0.00 usft Company: North America -ALASKA- BP Local Coordinate Reference: Well NK -08 Project: Niakuk TVD Reference: NK -08B Plan @ 66.05usft(P272 PLAN) Site: NK MD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Well: NK -08 North Reference: True Wellbore: Plan NK -08B Survey Calculation Method: Minimum Curvature Design: NK -08B WP04 Database: EDM RSK- Alaska PROD -ANCP1 lett Niakuk, GPMA, NIAKUK t System: Alaska NAD27 State Plane Zones - System Datum: Mean Sea Level t Datum: NAD27' OGP-Usa AK [4267'158641 Using Well Reference Point r Zone: NAD27' OGP-Usa AK I Alaska zone 4 [26734.1586, Using geodetic scale factor site NK, TR -12-15 Site Position: From: Map Position Uncertainty: 0.00 usft Well NK -08, NK -08 Well Position +N/ -S 0.00 usft +E/ -W 0.00 Usti Position Uncertainty 0.00 usft Wellbore Plan NK -08B Magnetics Model Name Sample Date BGGM2018 4/1/2019 Design NK -08B WP04 Audit Notes: Version: Phase: Vertical Section: Depth From (TVD) (usft) 4388 Northing: Easting: Slot Radius: Northing: Fasting: Wellhead Elevation: 5,981,257.790 usft 714,553.260 usft 0.000 in 5,979,798.600 usft 721,465.300 usft 22.17 usft Latitude: Longitude: Grid Convergence: Latitude: Longitude: Ground Level: Declination Dip Angle Field Strength 1°I I°I (nTl 17.07 81.00 57 435 PIAN Tie On Depth: 9,905.25 +N/ -s +FJ -W Direction (usft) (usft) (°) 0.00 0.00 45.00 70° 21'5.879 N 148° 15'27.984 W 1.64 ° 70° 20'49.555 N 148° 12'7.308 W • 19.10usft 12202018 2:58.42AM Page 2 COMPASS 5000.1 Build 61D RE BP BP Well Plan Survey Report Company: North America - ALASKA - BP Local Coordlnate Reference: Wall NK -08 Project: Niakuk TVD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Site: NK MD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Well: NK -08 North Reference: True Wellbore: Plan NK -088 Survey Calculation Method: Minimum Curvature Design: NK -08B WP04 Database: EDM RSK- Alaska PROD -ANCP1 Surrey Tool Program Date 12/20/2018 From To (usft) (usft) Survey (Wellbore) Tool Name Description 105.25 9,905.25 1 : Gyrodata gyrocompassing ml (NK -08) GYD-GC-MS Gyrodata gyrocompassing m/s 9,905.25 10,400.00 NK -08B WP04 (Plan NK -088) BLIND Blind drilling 10,400.00 15,692.00 NK -08B WP04 (Plan NK -08B) MWD MWD - Standard 10,400.00 15,692.00 NK -08B WP04 (Plan NK -0813) MWD+IFR+MS-WOCA MWD+ IFR+ Multi Station W/O Crustal 15,692.00 19,715.40 NK -08B WP04 (Plan NK -08B) MWD MWD - Standard 15,692.00 19,715.41 NK -08B WP04(Plan NK -088) MWD+IFR+MS-WOCA MWD + IFR +Muth Station W/O Crustal Planned Survey MD Inc Azi TVD TVDSS NIS ENV Northing Easting DLeg TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (°) 9,905.25 63.22 317.65 6,141.43 6,075.38 5,147.64 -4,729.93 5,984,803.999 716,585.543 0.00 0.00 i TIP 10,000.00 63.48 317.82 6,183.93 6,117.88 5,210.31 4,786.88 5,984,864.956 716,526.764 0.32 30.34 KOP-9518" 10,016.00 63.50 320.05 6,191.08 6125.03 5,221.10 -4,796.29 5,984,875.467 716,517.045 12.50 90.00 Start 20.00 hold at 10016.00 MD 10,036.00 63.50 320.05 6,200.00 6,133.95 5,234.82 -4,807.78 5,984,888.843 716,505.154 0.00 0.00', Start DLS 3.50 TFO 95.00 10,100.00 63.32 322.55 6,228.65 6,162.60 5,279.49 -4,843.55 5,984,932.426 716,468.074 3.50 95. 10,200.00 63.14 326.47 6,273.70 6,207.65 5,352.16 -4,895.38 5,985,003.535 716,414.129 3.50 93.88 10,300.00 63.07 330.39 6,318.95 6,252.90 5,428.12 -4,942.06 5,985,078.080 716,365.227 3.50 92.12 10,400.00 63.10 334.32 6,364.24 6,298.19 5,507.09 -4,983.42 5,985,155.784 716,321.551 3.50 90.34 10,456.00 63.16 336.51 6,389.55 6,323.50 5,552.51 -5,004.20 5,985,200.570 716,299.437 3.50 88.57 Start 800.00 hold at 10456.00 MD 10,500.00 63.16 336.51 6,409.41 6,343.36 5,588.52 -5,019.85 5,985,236.099 716,282.733 0.00 0.00 10,600.00 63.16 336.51 6,454.56 6,388.51 5,670.35 -5,055.41 5,985,316.847 716,244.769 0.00 0.00 10,700.00 63.16 336.51 6,499.70 6,433.65 5,752.19 -5,090.98 5,985,397.594 716,206.805 0.00 0.001 10,800.00 63.16 336.51 6,544.84 6,478.79 5,834.03 -5,126.54 5,985,478.342 716,168.840 0.00 0.00 10,900.00 63.16 336.51 6,589.98 6,523.93 5,915.87 -5,162.10 5,985,559.089 716,130.876 0.00 0.00 1220,2018 2:58:42AM Page 3 COMPASS 5000.1 Build 81D a m 5 Qp U m m m E 0 Q Y m Z m 0 y O C O 0 w O z z z z z z z a z a Q � T _ W c : a d y O C y 0 0 d ry y m ua`v�33o a J O OW m^ N O O 0 0 O O O O O O b r m O m m m P O O O O O O O O O r Q N m O O 6 O 6 O O6 O0 O v Q p` C m m m m m f j P m F O O h h O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 D o m R O O O O m m m m m O O O O O O O O O O O m b m b 0 0 0 0 �+i of vi of of o 0 0 0 0 0 0 0 0 0 0 n m m ci U U gC 3o g'H N A T Omi r (^ W Q r O P r O m m W b t'1 Ol m N � m N m p m m m m r r r n r m m m 0 0 o W WA W m m m m m m m W " r m N Q N P i m P W m m m m m m m m N b r b O m m m b m P r O P P N W m m m m b m m m N m O m W b r N r m m r m Oi b O m b m m N Q b r O 0' P tp W O Q C] m O m r b p N r r m Q r OI m N O Q m m b m b N O rn m m b Q C) N W W m m m r m m m W O N m Q P b b r m W O O N m m b b m m m r 1 r m n r r w m m m m m W m W m W m W m W m rn m m m W m W m W m W m W m W m W m W m m W m W m W m m = rn b W ilf W N m N m N b m N N m m m m m N m m m b m m b m m m rn m Q m m b m m N O m n o Q Q m r m N r r m O m m N r W m m m O N Q m r W m m N r (7 Ol 01 t7 Q' m r b O Q m N r m W m m m r W m m m O m m n m W O N m P m r W O m m V m m 1A N m N 1n N N m b m IA m IA m m m m m N Q N Q N Q N Q N Q m P m Q N m m m IA m N m N b h m h b b 2 W N W m r W r m r m P O rn m r m N Q N O m W r m n W r f0 O PN o N m n m m Q m N o W m r m m m W O N N m Q m m m m r m W O N m m P Q m m r Z_ m N m V W O m W m Q m Q r o m m W N m m m m O N m t0 Q Q W m N m r Nm O m W m r N W r O b m Q, m P W V Q W m r W Q m b m N m N m m N N r m m m m O Q W m V m N m o m W a m N r O to b m m W � b r r r m eJ m W W 0 o N N m w z= r W Q b m m 0 N N p N O O N Q m b Q W CPJ [mV m Omi Q m m m m m P m m m m m m N r m r r r m m m O W W Q W W W m O r O N �O O N m N rn N m m r m m m N P r Q m z3 m m m m N O m W W W W W rn W W W W W W N m O m (O (O t0 tp m N m W O O O O O O O O O O O O m m 0 m m m m m Q m m b m m m m m m m m m m m m m Q 0 m m b b N N m 20 m m m m m m m m b b N W O m N P ^^ N O N N N N NQ N N N N N N m W N Q p Q p y N m m b m m m m b b m m m m tO (O t0 m m t0 b m O m m b W b y m yhy Q q � a ti o pr O 00 O O O O O O O O O O O O O O O O m tb'1 O O O O Q O O O O y O O O O N O O O O O O O O O O b b O O O O p O O O N' O O N O O O O O O O o 0 0 w O O O O aj O N N Q O m o m m m W O N m P m b IliN C` ' Y r N m N m f j b m m REG BP BP Well Plan Survey Report Company: North Amenca- ALASKA -BP Local Co-ordinate Reference: WeII NK -08 Project: Niakuk ND Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Site: NK MD Reference: NK -088 Plan @ 66.05usft (P272 PLAN) Well: NK -08 North Reference: True Wellbore: Plan NK -08B Survey Calculation Method: Minimum Curvature Design: NK -088 WP04 Database: EDM RSK- Alaska PROD -ANCP1 Planned Survey MD Inc Azl TVD. TVDSS NIS ENV Northing Easting DLeg TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I1100usft) (°) 13,100.00 52.78 1.42 7,592.03 7,525.98 7,818.08 -5,557.27 5,987,448.711 715,679.691 3.50 140.81__ 13,200.00 50.16 4.39 7,654.33 7,588.28 7,896.19 -5,553.34 5,987,526.896 715,681.308 3.50 139. 13,300.00 47.63 7.61 7,720.07 7,654.02 7,971.11 -5,545.51 5,987,602.013 715,686.925 3.50 137.32 13,400.00 45.20 11.08 7,789.02 7,722.97 8,042.56 -5,533.80 5,987,673.781 715,696.519 3.50 135.21 13,500.00 42.88 14.85 7,860.91 7,794.86 8,110.29 -5,51825 5,987,741.934 715,710.056 3.50 132.82 13,600.00 40.70 18.96 7,935.48 7,869.43 8,174.03 -5,498.93 5,987,806.217 715,727.485 3.50 130.10 13,700.00 38.67 23.43 8,012.45 7,946.40 8,233.55 -5,475.90 5,987,866.389 715,748.740 3.50 127.04 13,800.00 36.83 28.30 8,091.53 8,025.48 8,288.63 -5,449.26 5,987,922.228 715,773.743 3.50 123.60 1 13,900.00 35.21 33.57 8,172.42 8,106.37 8,339.06 -5,419.10 5,987,973.524 715,802.400 3.50 119.75 14,000.00 33.83 39.25 8,254.83 8,188.78 8,384.65 -5,385.53 5,988,020-085 715,834.604 3.50 115.48 14,100.00 32.74 45.31 8,338.45 8,272.40 8,425.24 -5,348.68 5,988,061.739 715,870.236 3.50 110.80 14,200.00 31.94 51.69 8,422.96 8,356.91 8,460.66 -5,308.69 5,988,098.330 715,909.162 3.50 105.73 14,300.00 31.48 58.29 8,508.06 8,442.01 8,490.80 -5,265.70 5,988,129.722 715,951.237 3.50 100.35 14,400.00 31.37 65.00 8,593.41 8,527.36 8,515.53 -5,219.88 5,988,155.796 715,996.304 3.50 94.73 14,500.00 31.61 71.69 8,678.71 8,612.66 8,534.77 -5,171.40 5,988,176.457 716,044.196 3.50 89.00 14,600.00 32.18 78.23 8,763.64 8,697.59 8,548.44 -5,120.44 5,988,191.627 716,094.732 3.50 83,2'- 14.691.82 33.00 84.00 8,841.02 8,774.97 8,556.04 -5,071.62 5,988,200.671 716,143.304 3.50 77.-1 Start 1000.00 hold at 14691.82 MD 14,700.00 33.00 84.00 8,847.88 8,781.83 8,556.51 -5,067.19 5,988,201.262 716,147.720 0.00 -150.42 14,800.00 33.00 84.00 8,931.75 8,865.70 8,562.20 -5,013.02 5,988,208.553 716,201.691 0.00 0.00 14,900.00 33.00 84.00 9,015.61 8,949.56 8,567.89 -4,958.85 5,988,215.844 716,255.663 0.00 0.00 15,000.00 33.00 84.00 9,099.48 9,033.43 8,573.58 -4,904.69 5,988,223.135 716,309.634 0.00 0.00 15,100.00 33.00 84.00 9,183.35 9,117.30 8,579.28 -4,850.52 5,988,230.425 716,363.605 0.00 0.00 15,200.00 33.00 84.00 9,267.21 9,201.16 8,584.97 -4,796.36 5,988,237.716 716,417.576 0.00 0.00 15,300.00 33.00 84.00 9,351.08 9,285.03 8,590.66 -4,742.19 5,988,245.007 716,471.548 0.00 0.00 15,400.00 33.00 84.00 9,434.95 9,368.90 8,596.36 -4,688.03 5,988,252.298 716,525.519 0.00 0.00 15,500.00 33.00 84.00 9,518.82 9,452.77 8,602.05 -4,633.86 5,988,259.589 716,579.490 0.00 0.00 12202016 2:56:42AM Page 6 COMPASS 5000.1 Build 81D as Company: North America -ALASKA - BP Project: Niakuk Site: NK Well: NK -08 Wellbore: Plan NK -08B Design: NK -08B WP04 Planned Survey MD Inc (usft) (°) 15,600.00 33.00 15,691.82 33.00 Start 120.00 hold at 15691.82 MD 15,692.00 33.00 7" TFace 15,700.00 33.00 15,800.00 33.00 15,811.82 33.00 Start Build 10.00 (usft) 15,900.00 41.82 16,000.00 51.82 16,100.00 61.82 16,200.00 71.82 16,300.00 81.82 16,381.82 90.00 Start Build 8.00 -4,579.70 16,400.00 91.45 16,500.00 99.45 16,600.00 107.45 16,631.82 110.00 Start Tum .1.26 9,613.64 16,700.00 110.00 16,800.00 110.00 16,871.62 110.00 Start US 6.00 TFO -159.00 16,900.00 108.42 17,000.00 102.80 17,100.00 97.16 BP BP Well Plan Survey Report Local Coordinate Reference: Well NK -08 TVD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) MD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 AN 9,974.72 TVD TVDSS -3,679.94 Nis ENV 4.00 Northing 76.84 Easting DLeg TFace (°) 5,988,410.317 (usft) (usft) 4.00 (usft) 73.78 (usft) 9,849.91 (usft) -3,522.45 (usft) (°1100usft) (°) 84.00 -89.48 9,602.68 9,536.63 9,840.63 8,607.74 -3,496.95 -4,579.70 5,988,266.879 6.00 716,633.461 0.00 0.01. 84.00 8,776.32 9,679.69 9,613.64 8,612.97 6.00 -4,529.96 68.87 5,988,273.574 9,796.41 716,683.018 0.00 0 O 84.00 717,893.640 9,679.84 9,613.79 8,612.98 4,529.86 5,988,273.587 716,683.115 0.00 0.00 8400 9,686.55 9,620.50 8,613.44 -4,525.53 5,988,274.170 716,687.433 0.00 0.00 84.00 9,770.42 9,704.37 8,619.13 -4,471.36 5,988,281.461 716,741.404 0.00 0.00 84.00 9,780.33 9,714.28 8,619.80 -4,464.96 5,988,282.323 716,747.784 0.00 0.00 84.00 9,850.30 9,784.25 8,625.40 -4,411.74 5,988,289.487 716,800.816 10.00 0.00 84.00 9,918.65 9,852.60 8,633.01 -4,339.31 5,988,299.236 716,872.983 10.00 0.00 84.00 9,973.31 9,907.26 8,641.75 -4,256.18 5,988,310.425 716,955.814 10.00 0.00 84.00 10,012.63 9,946.58 8,651.34 -4,164.88 5,988,322.715 717,046.793 10.00 0.00 84.00 10,035.40 9,969.35 8,661.51 -4,068.17 5,988,335.732 717,143.155 10.00 0.00 84.00 10,041.23 9,975.18 8,670.03 -3,987.07 5,988,346.648 717,223.960 10.00 0.00' 84.00 10,041.00 9,974.95 8,671.93 -3,968.99 5,988,349.081 717,241.973 8.00 0.0. 84.00 10,031.50 9,96545 8,682.33 -3,870.07 5,988,362.396 717,340.540 8.00 0.00 84.00 10,008.26 9,942.21 8,692.48 -3,773.43 5,988,375.405 717,436.837 8.00 0.00 84.00 9,998.04 9,931.99 8,695.63 -3,743.46 5,988,379.439 717,466.699 8.00 0.00 81.10 9,974.72 9,908.67 8,703.94 -3,679.94 5,988,389.620 717,529.940 4.00 -89.50 76.84 9,940.51 9,874.46 8,721.92 -3,587.73 5,988,410.317 717,621.572 4.00 -89.27 73.78 9,915.96 9,849.91 8,739.04 -3,522.45 5,988,429.356 717,686.314 4.00 -89.48 73.14 9,906.68 9,840.63 8,746.62 -3,496.95 5,988,437.683 717,711.586 6.00 -159.00 70.96 9,879.78 9,813.73 8,776.32 -3,405.38 5,988,470.071 717,802.235 6.00 -159.21 68.87 9,862.46 9,796.41 8,810.14 -3,312.93 5,988,506.608 717,893.640 6.00 -159.80 12202018 2:58:42AM Page 6 COMPASS 5000.1 Build 81D L as Company: North America -ALASKA -BP Project: Niakuk Site: NK Well: NK -08 Wellbore: Plan NK -08B Design: NK -088 WP04 Planned Survey MD Inc (usft) 1'1 17,200.00 91.51 17,288.76 86.50 Start 910.00 hold at 17288.76 MD 17,300.00 86.50 17,400.00 86.50 17,500.00 86.50 17,600.00 86.50 17,700.00 86.50 17,800.00 86.50 17,900.00 86.50 18,000.00 86.50 18,100.00 86.50 18,198.76 86.50 Start DLS 2.00 TFO 105.00 18,200.00 86.49 18,300.00 85.98 18,400.00 85.47 18,500.00 84,96 18,598.76 84.47 Start US 2.00 TFO 140.00 18,600.00 84.45 18,698.76 82.94 Start 650.00 hold at 18698.76 MD 18,700.00 82.94 18,800.00 82.94 18,900.00 82.94 19,000.00 82.94 19,100.00 82.94 1220/2016 2:58:42AM BP BP Well Plan Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well NK -08 NK -088 Plan @ 66.05usft (P272 PLAN) NK -08B Plan @ 66.05usft (P272 PLAN) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Azi TVD TVDSS NIS ENV Northing Easting DLeg TFace (°) (usft) (usft) (usft) (usft) (usft) (usft) (°It00usft) (^) 66.84 9,854.90 9,788.85 8,847.71 -3,220.61 5,988,546.893 717,984.799 6.00 -160.16- 65.04 9,856.43 9,790.38 8,883.88 -3,13960 5,988,585.437 718,064.701 6.00 -160.: 65.04 9,857.12 9,791.07 8,888.61 -3,129.43 5,988,590.468 718,074.726 0.00 0.001 65.04 9,863.22 9,797.17 8,930.73 -3,038.94 5,988,635.237 718,163.931 0.00 0.00 65.04 9,869.33 9,803.28 8,972.64 -2,948.45 5,988,680.006 718,253.137 0.00 0.00 65.04 9,875.43 9,809.38 9,014.96 -2,857.95 5,988,724.774 718,342.342 0.00 0.00 65.04 9,881.54 9,815.49 9,057.07 -2,767.46 5,988,769.543 718,431.548 0.00 0.00 65.04 9,887.64 9,821.59 9,099.19 -2,676.97 5,988,814.312 718,520.753 0.00 0.00 65.04 9,893.75 9,827.70 9,141.30 -2,586.47 5,988,859.081 718,609.959 0.00 0.00 65.04 9,899.85 9,833.80 9,183.42 -2,495.98 5,988,903.849 718,699.164 0.00 0.00 65.04 9,905.96 9,839.91 9,225.53 -2,405.49 5,988,948.618 718,788.369 0.00 0.00 65.04 9,911.99 9,845.94 9,267.13 -2,316.11 5,988,992.832 718,876.470 0.00 0.00 65.07 9,912.06 9,846.01 9,267.65 -2,314.99 5,988,993.386 718,877.575 2.00 105.00 67.00 9,918.63 9,852.58 9,308.18 -2,223.82 5,989,036.589 718,967.511 2.00 105.00 68.94 9,926.09 9,860.04 9,345.57 -2,131.38 5,989,076.701 719,058.799 2.00 104.8, 70.88 9,934.43 9,868.38 9,379.80 -2,037.79 5,989,113.673 719,151.328 2.00 104.73 72.81 9,943.53 9,877.48 9,410.44 -1,944.35 5,989,147.061 719,243.819 2.00 104.56 72.82 9,943.65 9,877.60 9,410.80 -1,943.17 5,989,147.459 719,244.985 2.00 140.00 74.10 9,954.50 9,888.45 9,438.75 -1,849.08 5,989,178.171 719,338.211 2.00 140.00 74.10 9,954.65 9,888.60 9,439.08 -1,847.90 5,989,178.542 719,339.382 0.00 0.00 74.10 9,966.95 9,900.90 9,466.27 -1,752.45 5,989,208.537 719,433.978 0.00 0.00 74.10 9,979.24 9,913.19 9,493.46 -1,657.01 5,989,238.532 719,528.573 0.00 0.00 74.10 9,991.54 9,925.49 9,520.65 -1,561.56 5,989,268.526 719,623.168 0.00 0.00'. 74.10 10,003.84 9,937.79 9,547.83 -1,466.12 5,989,298.521 719,717.764 0.00 0.00 Page 7 COMPASS 50001 Build BID Company: North America - ALASKA - BP Project: Niakuk Site: NK Welt: NK -08 Wellbore: Plan NK -08B Design: NK -08B WP04 Planned Survey MD Inc (usft) (I 19,200.00 82.94 19,300.00 82.94 19,348.76 82.94 Start DLS 3.00 TFO 180.00 19,400.00 81.40 19,500.00 78.40 19,600.00 75.40 19,700.00 72.40 19,714.41 71.97 5 112' 19,715.41 71.94 TD at 19715.41 , Casing Points BP BP Well Plan Survey Report Measured Vertical Casing Local Co-ordinate Reference: Well NK -08 Depth Diameter Diameter TVD Reference: (usft) NK -08B Plan @ 66.05usft (P272 PLAN) (in) (in) 15,692.00 9,679.54 MD Reference: 7 000 NK -08B Plan @ 66.05usft (P272 PLAN) 19,714.41 10,113.72 51/2' 5.500 North Reference: 10,000.00 True 95/8" 9.625 12.250 Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Azi TVD TVDSS WS EIW Northing Easting DLeg r) (waft) (usft) (usft) Wait) (usft) (usft) ('1100usft) 74.10 10,016.13 9,950.08 9,575.02 -1,370.67 5,989,328.515 719,812.359 0.00 74.10 10,028.43 9,962.38 9,602.21 -1,275.23 5,989,358.510 719,906.954 0.00 74.10 10,03442 9,968.37 9,615.47 -1,228.69 5,989,373.136 719,953.081 0.00 74.10 10,041.40 9,975.35 9,629.37 -1,179.87 5,989,388.477 720,001.463 3.00 74.10 10,058.94 9,992.89 9,656.34 -1,085.20 5,989,418.229 720,095.294 3.00 74.10 10,081.60 10,015.55 9,683.02 -991.54 5,989,447.663 720,188.121 3.00 74.10 10,109.33 10,043.28 9,709.34 -899.15 5,989,476.698 720,279.691 3.00 74.10 10,113.74 10,047.69 9,713.09 -885.95 5,989,480.845 720,292.767 3.00 74.10 10,114.05 10,048.00 9,713.36 -885.03 5,989,481.133 720,293.676 3.00 Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 15,692.00 9,679.54 T 7 000 9.875 19,714.41 10,113.72 51/2' 5.500 6.125 10,000.00 6,183.93 95/8" 9.625 12.250 TFace r) O.Or _ O.0 0.00 -180.00 180.00 180.00 180.00 -180.00 180.00 1220/2018 2:58.42AM Page 8 COMPASS 5000.1 Build 81D BP BP Well Plan Survey Report Company: North America - ALASKA- BP Local Coordinate Reference: Well NK -08 Project: Niakuk TVD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Site: NK MD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Well: NK -08 Norm Reference: True Wellbore: Plan NK -OSB Survey Calculation Method: Minimum Curvature Design: NK -08B WP04 Database: EDM RSK- Alaska PROD -ANCP1 Plan Annotations Measured Vertical Local Coordinates Depth Depth +W -S +FJ -W jusit) (usft) (usft) (usft) Comment 9,905.25 6,141.43 5,147.64 4,729.93 TIP 10,000.00 6,183.93 5,210.31 4.786.88 KOP 10,016.00 6,191.08 5,221.10 4,796.29 Start 20.00 hold at 10016.00 MD 10,036.00 6,200.00 5,234.82 -4,807.78 Start DLS 3.50 TFO 95.00 10,456.00 6,389.55 5,552.51 -5,004.20 Start 800.00 hold at 10456.00 MD 11,256.00 6,750.69 6,207.21 -5,288.71 Start DLS 3.50 TFO 88.39 11,626.20 6,915.34 6,524.69 -5,381.24 Start 1058.43 hold at 11626.20 MD 12,684.63 7,375.03 7,466.14 -5,531.70 Start DLS 3.50 TFO 144.70 14,691.82 8,841.02 8,556.04 -5,071.62 Start 1000.00 hold at 14691.82 MD 15,691.82 9,679.69 8,612.97 -4,529.96 Start 120.00 hold at 15691.82 MD 15,811.82 9,780.33 8,619.80 4,464.96 Start Build 10.00 16,381.82 10,041.23 8,670.03 -3,987.07 Start Build 8.00 16,631.82 9,998.04 8,695.63 -3,743.46 Start Tum -4.26 16,871.82 9,915.96 8,739.04 -3,522.45 Start DLS 6.00 TFO-159.00 17,288.76 9,856.43 8,883.88 -3,139.60 Start 910.00 hold at 17288.76 MD 18,198.76 9,911.99 9,267.13 -2,316.11 Start DLS 2.00 TFO 105.00 18,598.76 9,943.53 9,410.44 -1,944.35 Start DLS 2.00 TFO 140.00 18,698.76 9,954.50 9,438.75 -1,849.08 Start 650.00 hold at 18698.76 MD 19,348.76 10,034.42 9,615.47 -1,228.69 Start DLS 3.00 TFO 180.00 19,715.41 10,114.05 9,713.36 -885.03 TD at 19715.41 12/10/2018 2:58:42AM Page 9 COMPASS 5000.1 Build 81D bood WI by North America - ALASKA - BP Niakuk NK NK -08 Plan NK -08B NK -08B WP04 Anticollision Summary Report 20 December, 2018 Company: North America - ALASKA - BP Project: Niakuk Reference Site: NK Site Error: 0.00usft Reference Well: NK -08 Well Error: 0 00usft Reference Wellbore Plan NK -08B Reference Design: NK -08B WP04 BP Anticollision Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Methal: Output errors are at Database: Offset TVD Reference: Wall NK -08 NK -08B Plan @ 66.05usft (P272 PLAN) NK -08B Plan @ 66.05usft (P272 PLAN) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference NK -08B WP04 (uaft) Survey (Wellbore) Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria GYD-GC-MS Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 9,905.25 to 19,715.41 usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 2,167.15usft Error Surface: Elliptical Conic Survey Tool Program From (usft) 105.25 9,905.25 10,400.00 10,400.00 15,692.00 15,692.00 Date 12/20/2018 TO (uaft) Survey (Wellbore) Tool Name 9,905.25 1 : Gyrodata gyrocempassing m/ (NK -08) GYD-GC-MS 10,400.00 NK -08B WP04 (Plan NK -088) BLIND 15,692.00 NK -088 WP04 (Plan NK -08B) MWD 15,692.00 NK -088 WP04 (Plan NK -08B) MWD+IFR+MS-WOCA 19,715.40 NK -08B WP04 (Plan NK -08B) MWD 19,715.41 NK -08B WP04 (Plan NK -088) MWD+IFR+MS-WOCA Description Gyrodata gyrocompassing m/s Blind drilling MWD - Standard MWD + IFR + Multi Station W/O Crustal MWD - Standard MWD + IFR + Multi Station W/0 Crustal 12,20201812:56:03AM Page 2 of 4 COMPASS 5000.1 Build 81D BP by Anticollision Report Company: North America - ALASKA- BP Local Coordinate Reference: Weil NK -08 Project: Niakuk TVD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Reference Site: NK MD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Site Error: O.00usft North Reference: True Reference Well: NK -08 Survey Calculation Method: Minimum Curvature Well Error: O.Oousft Output errors are at 1.00 sigma Reference Wellbore Plan NK -08B Database: EDM R5K - Alaska PROD - ANCP1 Reference Design: NK -08B WP04 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Waming Site Name Depth Depth Distance (uslt) from Plan Offset Well - Wellbore - Design (usft) Will) (usR) (usfp NK NK -07 -NK -07 -NK -07 9,923.45 10,000.00 1,018.35 327.89 693.99 Pass - Major Risk NK -07 -NK -07A -NK -07A 9,929.22 10,000.00 1,019.07 328.37 694.23 Pass - Major Risk NK -08 -NK -08 -NK -08 10,228.40 10,225.00 18.54 0.00 18.54 Pan -NOERRORS NK-08-NK-OBA-NK-08A 10,211.73 10,200.00 16.08 0.00 16.08 Pan -NOERRORS NK -09 -NK -09 -NK -09 12,839.89 13,875.00 631.40 538.76 168.41 Pass -Major Risk NK -10 -NK -10 -NK -10 9,926.43 9,925.00 975.39 334.76 703.38 Pass -Major Risk NK -11 -NK -11 -NK -11 12,788.15 13,200.00 1,231.96 400.38 930.00 Pass -Major Risk NK-11-NK-1IA-NK-IIA 11,634.46 12,875.00 99.09 62.77 43.01 Pass -Minor 1/200-- NK-11-NK-11APB1-NK-11APB1 11,634.46 12,875.00 99.09 62.77 43.01 Pass - Minor 1/200 - NK -11- NK-11PB1- NK-11PB1 12,788.15 13,200.00 1,231.96 400.27 930.11 Pass - Major Risk NK -11 - NK-11PB2 - NK-11PB2 12,788.15 13,200.00 1,231.96 400.27 930.11 Pass - Major Risk NK -12 - NK -12 - NK -12 Out of range NK -12 - NK -12A - NK -12A 15,164.80 14,450.00 111.56 83.70 41.31 Pass - Minor 1/200 NK -12 - NK -12B - NK -12B 14,350.97 14,325.00 558.15 385.64 175.22 Pass - Major Risk NK -12 - NK -12C - NK -12C 14,350.97 14,325.00 558.15 385.17 175.68 Pass - Major Risk NK -13 - NK -13. NK -13 13,226.24 13,675.00 1,159.59 398.17 822.94 Pass - Major Risk NK -14 -NK -14 -NK -14 14,199.25 13,775.00 1,893.48 406.82 1,500.23 Pass - Major Risk NK -14 -NK -14A -NK -14A 14,199.25 13,775.00 1,893.48 406.82 1,500.23 Pass - Major Risk NK-14-NK-14AP61-NK-14APB1 14,199.25 13,775.00 1,893.48 406.82 1,500.23 Pass - Major Risk NK -14 -NK -14B -NK -14B 14,140.65 13,500.00 1,960.67 388.49 1,577.51 Pass - Major Risk NK -15 - NK -15 - NK -15 Out of range NK -15 - NK -15A - NK -15A Out of range NK -17 - NK -17 - NK -17 Out of range NK -17 - NK-17PB1 - NK-17PB1 Out of range NK -17 - NK-17PB2 - NK-17PB2 Out of range NK -27 -NK -27 -NK -27 9,918.88 10,400.00 1,602.86 366.07 1,237.46 Pass - Major Risk NK -28 -NK -28 -NK -28 9,921.47 9,925.00 1,093.85 378.08 905.03 Pass - Major Risk NK -28 - Plan NK -28A- NK -28A WP07 Prelim 11,532.28 11,850.00 851.00 344.68 624.53 Pass - Major Risk NK -29 -NK -29 -NK -29 9,922.52 10,650.00 454.16 336.89 140.48 Pass - Major Risk NK -38 -NK -38B -NK -38B 18,778.63 17,050.00 2,145.12 343.70 1,820.24 Pass - Major Risk NK -61 - NK -61 - NK -61 Out of range NK-6I-NKEIA-NK-61A 16,955.25 14,925.00 721.41 207.01 544.16 Pass -Major Risk NK 01 Island NK -01 - NK -01 - NK -01 12,211.27 7,350.00 456.70 249.02 213.96 Pass - Major Risk NK -01 -NK -01A -NK -01A 12,211.27 7,350.00 456.70 249.03 213.95 Pass - Major Risk NK -02 -NK -02 -NK -02 13,630.25 8,425.00 1,009.93 12.98 1,006.69 Pass - Minor 1/200" NK -02 -NK -02A -NK -02A 13,630.25 8,425.00 1,009.93 12.98 1,006.69 Pass - Minor 1/200 NK -02 - NK-02APB1 - NK-02APB1 13,630.25 8,425.00 1,009.93 13.14 1,006.53 Pass -Minor 1/200 .-.. 12202018 12:56.03AM Page 3 of 4 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP Project: Niakuk Reference Site: NK Site Error: 0.00usft Reference Well: NK -08 Well Error: 0,00usft Reference Wellbore Plan NK -08B Reference Design: NK -08B WP04 BP Anticollision Report Local Coordlnate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Wall NK -08 NK -08B Plan Q 66.05usft (P272 PLAN) NK -08B Plan @ 66.05usft (P272 PLAN) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum -d- Reference Depths are relative to NK -08B Plan @ 66.05usft (P272 Coordinates are relative to: NK -08 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Use AK Central Meridian is 1501 0'0.000 W ° Grid Convergence at Surface is: 1.69° Ladder Plot NK -12, NK -12C, NK-12CV12 -6- NK-1dy10 wrR, -VpW(3500usffin) $ NK62,NK-62,NK-62V14 NK -12,W -12,W -12V13 NK -12, NK -126, IWC -12B V5 NK -08, NIC -0&q NK -08A V5 NK -08, NK -08, NK -08 V1 NK -07, NK -07, NK -07 V7 NK-0TW-O7A,NK-07AV5 NK -02, NK -02, NK -02 V2 NK -02, NK -02A, NK -02A V1 NK -02, NK-02APBI, NK-02APS1 VO NK -65, NC65PB1, W65PB1 V7 -0- NK -14, NK -14B, NK -14B VO $ NK-14,NC-14APB1,NK-14APB1V3 $ NK-15,W-15A,NK-15AV0 $ NK-15,NK-15,W-15V20 �(- NK -17, NC -17, NK -17 V8 -b- NK-17,NC-17PB2,NlK-17PB2V1 -IF NK-17,NC-17PB1,NK-17PB1VO $ NK-29,NK-29,NK-29V38 $ NK-3B,NK38AP81,NC-38APB1V7 $ NK38, NC -38A, NK38AV12 NK62,NK-62A,NK62AV3 �- NK -11,W-11 PB1, NK -11 PB1 V18 $ NK -11, NK -11 A, NK-11AV5 $ NK -11, NK-11APB1, NK-11APB1 V29 $ NK -11, NC -11 PB2, W-11 PB2V5 -X- NK -11, NK -11, NK -11 V5 -&- NK -16, NK -16, NK -16 V2 ♦- NK-01,W-01,NK-01 Vt $ NK-01,W-01A,NC-01AV1 -+- NK-27,W-27,NK-27V3 12/20/201812:56 03A Page 4 of 4 COMPASS 5000.1 Build 81D SECTION DETAILS See MD Project: Niakuk wb,w ro�u w.0 WELL DETAILS WELLBORE DETAILS IFfEPENCENFQd.MibN by She: NK Well NK -O8 Wellbar.: Plan NK -08B PlanNK-08BWPO4omrtmla Q p s ar q"n ol.ntar G ndlea I'. 19.10 NonhnO 5979798.6011 I fasting. 721485,300 1 LOWWd: 7W2W40.555N I LoWWda: 148° IT7.308 W %an NI6068 Po"I WNI6DFe. N"11 ie on MD'. 090535 CoatlreblN'D Balunm MNKMT.f4v0 Vapr&(TVD1 Rde xrcLABP@n�640 u01WR%AQ 9. Ns; Belaam: SW P -DON OAOE) Mknoued pooh Bele�ens N1 W9PImQ%.L61e111PlRflAM COLuAanm Malted M'rttunC.. SECTION DETAILS See MD Inc Ali TVD -NIS eEWd Dleg TFace VSecl 1 990535 6312 317.65 6141.43 5147.64 -4729.93 0.00 0.00 295.37 2 10000.00 63.48 317.82 6183.93 5210.31 -4786.88 0.32 30,34 299.41 3 10016.00 6350 320.05 619128 5221.10 -4796.29 12.50 90.00 300.39 4 10036!70 63.50 320.05 6200,00 5234.82 4807.70 0.00 0.00 301.97 5 10456:70 63.16 336.51 6389.55 5552.51 -5004.20 3.50 95.00 307.71 6 11256:70 63.16 336.51 6750.69 6207.21 -5288.71 0.00 0.00 649.48 7 11626.20 64.26 350.92 6915.34 6524.69 5381.24 3.50 88.39 800.54 8 12684.33 64.26 350.92 7375.03 7466.14 3531.70 0.00 0.00 1357,86 9 14691.32 33.00 04.00 084132 6556.04 5071.62 3.50 144.70 2463.85 f0 15691.32 33.00 84.00 9679.69 0612.97 4529,96 0.00 0.00 2BR7.12 11 15811.32 33.00 84.00 9780.33 8619.80 4464.96 0.00 0.00 2937.92 12 163Bi.32 90.00 84.00 10041.23 8670.03 3997.07 10.00 0.00 3311.35 13 16631.32 110.00 84.00 9398.04 8695.63 -3743.46 820 0.00 3501.72 14 16871.32 110.00 73.78 9915.96 8739.04 3522.45 4.00 .90.00 3608.68 15 17280.76 86.50 65.04 9856.43 908338 3139.60 6.00 -159.00 4061.82 16 10198.76 86.50 65.04 9911.99 9267.13 -2316.11 0.00 0.00 4915.11 17 10598.76 84.47 72.81 994353 9410.44 -1944.35 2.00 10.5.00 5279.32 18 10698.76 82.94 74.10 995450 9438.75 .1849.08 2.00 140.00 5366.71 19 19348.76 82.94 74.10 10034.42 9615.47 -1228.69 0.00 0.00 5930.35 20 19715.41 71.94 74.10 10114.05 9713.36 -865.03 3.00 190.00 6242.57 AMIOTATgNS TVD MD Annotation 6141.43 9905.25 TP 6183.93 10000.00 KOP 6191.08 10016.00 SIa1120.00MBa110016.00MD 6200.00 10036.00 Stan DLS3.50TF0952O 6389.55 10456.00 Stan 800.00 hotlat 10456.00 MD 6750.691/256.00 Stan DLS3.50TF00839 6915.34 11626.20 Stan 1058.43 hotl at 11626.20 MD 7375.03 12684.63 StanDLS 3.50 TFO 144.70 8841.021469132 Stan 1000.00 hold at 14691.82 MD 9679.69 1569132 Stan 120.00 ho at 15691.82 MD 978033 15011.82 Stan Budd 10.00 1004113 1638132 SlenBu168.00 9998.04 1663132 StanTum 4.26 9915.961687132 SIanDLS 6.00 TFO .159.00 9856.431728836 S1a1910.00 hotl at 17288.76 MO 9911.99 18198.76 S1adDLS229TP01O5.00 9943.53 H598.76 StanDLS 230 TF0140.00 9954.50 18698.76 Stan650.00 hotl at 18698.76 MD 10034.42 19348.76 Stan )LS 3.00TFO 180.00 10114.05 19715.41 TD at 19715.41 SURVEY PROGRAM cA81NGDEfuLa TVU MD Name Sae 1 Deptll Frpn DeptlITO SnrerA'41 Tod 618393 1000On 95/B' 8625 1 185.25 %0515 1:(.k0tlataW'IOmnWaseBRM(t4(CO) GYOGOk6 M7e.1 Ise AO 7• 1.000 9905.25 10400.00 NK-0BB WP04(Plau W-088) BLIND 101131219714.41 5in- 5.500 1040009 15692.00 WID8BWPO4(PI. W-088) IMJD - 10400.OD 15692.00 MILBBW (Man NK -089) M9DMm.lsxncA %5591.00 18715.40 MUIBB WP04(Plan W-080) MND 15692.00 1971SAl NK-0BBWP041Plan W-OBB) 1t%NDdFR4A5*=A J C OA non cm m D 7600 O V .J 8000 t a 0 8400 CM2 u 88 CMI U TBZ 9200 K,anik TKNG .r, 9600 SON Iviyhak L4 PLAN) 8 KOP 17. TR SUr12000holdat 10016 Hear) 95/8" -�5twtDL535OTF095.00 > Sten D B00.00holdst10456DOIS cO SWDLS3. 5OTFOeB.39 SUn 105843 holden 11626.201VID Stan DLS 3.50 TFO 14470 NK -ORB WPO4Fault5 NK -08B WP04 SUN I000.00holdm 14691.82 MD \6 Start 120 00holdat 15691. 821YOD Slat)Buld10.00 SWDLS3.0OTFOIR000 \$E� 'Stdn Build800 St.165000h.IdwI969II761VD NK141 ` Stan DLS20114OSV D Stan DL" 00TFb I05100 5172" NK48B WPo4 S1a7ITurn4'26 \9 \y " SIanDLS60DTFr3-159.00 TD at 1971541 Sw 91 SOO hoId at 17288.76 b4D Vertical Section at 45.000 (400 usttlin) V1: -ORB WNW 9+00 p c s � 8800 ^ a40o 0 s B0o0 + IK -08B WP04 Fau .IN O w n_oo � ++ Piojwt. Niteroi, 4K -13C NT4"A 'bP NK -14 M01 NA -14 NA aznwioni. Nar.wN.. vo>+I WELL DUALS WELLBORE DUALSREFEflENCENFgUNigN Lin lLllr Bib: NK Wall NNAB Wsllbero: PMn NK-0BB{�`{yV\} Plan: NK-08BWP04 ( T/ Ma ,g4y�ni 04arh Oln Doe'n/m1a M..r Scram. Ground Land 19.10 NaM'ng 5979798600 Eudora: 721455.300 "Hole: 10-]0'49.555N Lrnotaft 148.12'1.309 W Ron NBB WO Proud WeNEorc. NM8 Te m M0: 9905.25 Cow6eb IW flHmallot NNLN Ina NwOi yoNrdl( O)gNyanm. NX-0689bn®6fidiuX(P2nRAM ynlgn(IS)geMays SW-)0➢LW.000E) 64eedel DplF Rodrard NXUB9PIdo@WG5a8(P2RPIAN) Catuhlm MapuN MnmomCuvNue �So M1R:u O_,1P1f1 oN 1113 NK-O8BWP04Fault5 8ad NK -I IPEG IT ++ NA -13 4K -13C NT4"A 'bP NK -14 M01 NA -14 NA NK -149 M:-14 NK -I1 4FaWt4 NAP_ -14A �So M1R:u O_,1P1f1 NK-O8BWP04Fault5 NK -I IPEG .Irson .1500. 5 N011 1511" PD1111 - NK -08B IM4 000 liuu N\M� + NK -OSB WPo4T6 NK4)SB WP04 Fault , 75W NK -12A N1: -GIA IIW�n T1 'N(xr _ NK48B WP04T5 1WU i4N\ 40 g / aN-OSB 4T4 K-08BWP04Fat4 NK-OSBWP04Fa0lt7 NW0T3 Gy C 8209 1010 Gl on �'PoPo 0 l on NK- BWP04 a t' 3 lll00CI 7 NK+W 9500 NK.- 8B WP 4 + JB1 7 NK. .n 0U 70] J',c-�O Ibg11N ('50" NK -13I4 NK -08A 71% n N 9yCc "" NA -Ill 7f) NK -28 ,)yl 5(N1 le, 7600 000 NK -I 10 10011 0000 620 NK-111PBI^yam J �S..il NK -15A 60)& �.. e ) l'K-h" KA1A K-01 9d` NK-61 580 qd 41a 11 900 n o TSnn 0Results hProlact. Niakuk ANTI60LL1610N SETTINGS COMPANY DETAILS: NorthAnrerica-ALASKA_BP UP Site NK Interpolatin McOmd MD,hdara1: 25D0 CeI4WauonMethod. MnhMuMGurrvewreU Well' NK -0B Depth Range From: 990515 To 19715.41 Ermr System. ISCWSA Limited By: Centre Distance. 2167.15 Scan Method Tra, Cylinder North Wellbore: Plan NK -088 Reference: PNnNK-08BVVP04(NK-O91PIon NK-OBB) Error SurfaceEllipecalConic Plan' NKA8SWP0OWmi 4 eg Meme,' Rule. Basad NK -29 NK -OSA N K -O8 0 0 NK -11A NK-11APB1 NK -11A NK -09 Ladder Plot N NK -12C Measured 0 v From Colour To MD 9905 10450 10450 11500 11500 11700 11700 — 13200 13200 14300 14300 14400 14400- 15100 15100 15250 15250 19715 SURVEYPROGRAM North America -ALASKA -BP _ -NPxwcawef,xxauPom Depth From Depth To Surd"lPlen Tool SIN-wM-Iw. W.-fww - a... Po.a+w1- v �Pof,N4nPow aat—w 105.25 9905.25 1'.GyrB MINK -081 GY6GL-M6 - wre�w��ePor f xcfueevx�-fwewa -xcaxxve.wwuw �w�uw.�ww _ w 9905.25 10400.00 A"gyrawmpassmg NK-0SB WP04 (PMn NK-0BB) BLIND _fu.uxns+w xravo -M+Y VFM 10400.00 15892.00 NK-0BB W?04(Plan NK -088) MWD a rxa 1040D.00 15692.00 NK-0BB 44PO4(Plan NK-0BB) MWpNFR-MSMCA w _ow .vrm.vm _ 15692.00 19715.40 14W08B WP34(Man NK -0138) MWD 1 x�B1 xiaz xm,.,n. 19715.41 NK -OSB WPJ4(Man NK -088) MWDaIFR+MB-HOCA J wis.rxmwmw -wcuxx wxx t .. xcuxvawava -rw¢xxm+re�, r+`muafw -ram.xxou.xaauvt _15682.00 --- . W PNpm c4 N tiEmy �5LL9� Sore i F w $;, N. mid m m$ m a$ V4 R m N _N��M�$ssaaa� o, �oass =mm m moaeoao97 __ _ v ao � m.,m„ .morvnm„ t� sr.RR « RSRoosss$R:a�a o -.s9t;jp;zm3m�N R�Dj— «MITW 0 Uq w"ii"�i P.zm ;Ml zzzz g rt $;, N. mid m m$ m a$ V4 R m N mm m 9". $$$$m$Iasi o, X0 iiia$Shim ��m mumi,mnosmnne$"im v. umi�o � mmem3mm�B$Eo$`s$$$sos � m g Big `m nmm000v......�� _ sr.RR « RSRoosss$R:a�a o mmmmmmaa�aasae$$zma� y a b ;Ml zzzz g rt gNooss$aa.gmmmmm��;e^�: L1 m8800nmm: --m-m$$---- O O O O r a a U E OOi C-- N O< O N U 3 m6 X0 iiia$Shim o — : u�3o= 4 a 3 o i a b ;Ml zzzz g rt iem a� Q o"s � i I m w�ReOR o 0 �o „ s s e e z�zi�Ai�4���3x Y Z s z gaoY4.mz�:tl' ��M}pip rrtrtn .h c. m•rw• _r ,w.K Aw R l.rt'.1 / ,a_ I ti) r1 a.nn eS. ..enc. _•». •I • w`6 e � �M WJ YJ e a cr 1 _ ( tea' ..11 1 i :onc e Or VCft'fP eowrCe rJw r H m e ue_' �= a;y ..tae.. nwr•.•• fMC a-arcz• w PRUDHOE BAY DRILLING wc� i -re.0 wra.. moi •u.. w'x..xi•. jj BIG BORE WELLHEAD SYSTEM PRUDHOE BAY. ALASKA Weight: 3,200 LBS 1 I I CAMERON TOP OF ROTARY TABLE S- i CHOOE UNE 3-1/8' SM FLANGED MANUAL GTE VANE 3-1/8' SM FLANGED HYDRAIX GTE VALVE 3-1/8' 511 FLEX HOSE CELLAR AND WELL HEAD CONHWRATON ARE FOR REFERENCE ONLY 6 ARE DEPENDENT OF OPERAOYS REOUIREMVITS Cn WELL I I C I 7 `MPPLE UP: SPACER SPOT. 13 5/8' SM FLANGE TOP 13 5/8' 5M FINIGED BOTTOM SPIDER SPOOL 'W 13 5/8' SM FLANGE TOP 13 5/8' SM FLANGED BOTTOM DOUBLE SAWED ADAPTER 13 5/8' SM FLANGED TOP 11' SM FLAWAD BOTTOM CASING SPOOL ASSEMBLY 11' SM FLAWED TOP 11' SM RANGED BOTTOM CASING HEAD ASSEMBLY 11' SM RANGED TOP ROWBOK DELL NPNE: 32' M PPE SEAL WELDED TO THE BOTTOM OF THE FLOWBO% 3D -3/e' INNER DN TRIPLE INFLATABLE RUBBER SELL WELL BELL NIPPLE 16' DM UPPER, 18' DN LONER 3' CASING FELL OUTLET (QTY O 2) 13 5/8' SM BOROM LITE FIANCE 16' KEMPER SE1L-0-CRP (1 G) Y DA, SID. OUTLET (1 EA) 2' M SID. OUTLET DUTCH LOCK DOWN FLANGE ANNULAR BOP: 13-5/8' SM SIVFFTR UQ 13-5/8' SM MODED TOP 13-5/8' 5M FLAWED BOTTOM RAM TYPE BDP. 13 5/8' SM MY 6012 MUM BOP 13 5/e' SM STUDED TOP 13 5/8' SM FLAWED, BOTTOM W/ Y1/2' MANLLLL LOGICS W/ 11' BOOSTER DRKNNG CRDSS: 13 5/8' SM STUDDED TDP 13 5/8' SM FLANGED BOTTOM W (2) 3 1/8' SM SIDE OUTLETS KILL UNE: 2-1/16' SM FLEX NOSE 2-1/16' SM K 3-1/6' SM D.SA }1/8' SM FLANGED MANUAL GTE W1LVE 3-1/8' SM FLANGED HYORAIC GTE VALVE RAY TYPE BOP: 13 5/6' SM MOV W12 SINGLE BOP 13 5/e' SY STUDDED TOP 13 5/8' SM FLAWED BOTTOM 6012 BOP STACK (DRAFT 8. 3.17 L.C.) nVZIVcu STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMISd PERMIT TO DRILL NOV 0 2 2017 20 AAC 25.005 la. Type of Work: 11). Proposed Well Class: Exploratory - Gas ❑ Service -WAG ❑ Service - Disp❑ 1c.SAFIed for: Drill ❑ Lateral ❑ Stratigraphic Test El Development -Oil El Service -Winj ❑ Single Zone ®' Coafbei}W MIdNerates❑ Redrill m . Reentry ❑ Exploratory - Oil ❑ Development- Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket IZ -Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 29S105380 PBU NK -088 3 Address: 6. Proposed Dept: 12. Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 19697' TVD: 10114' PRUDHOE BAY, RWEN OIL • 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): ADL 034630 & 034626 Surface: 1266' FSL, 1099' FEL, Sec. 36, T12N, R1 5E, UM 8. DNR Approval Number: e 13. Appr imAt��-e111sputl tla[ep 4611' FSL, 227' FEL, Sec. 28, T1 2N, RISE, UM 84-062 M h 7�, 2y�', Q / O, Top of Productive Horizon: / V 9. Acres in Property: 2560 14 istance too NN�eyaar�eeslprop rty: Total Depth: 408' FSL, 3298' FWL, Sec. 24, T12N, R15E, UM 6 ri 41b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 66.05' fe }5. Distance to Nearest Well Open tots; me Pool: Surface: x- 721465 y- 5979799 Zone - ASP 4 GL Elevation above MSL: 19.1 e4 16. Deviated wells: Kickoff Depth: 10000 feet / 17. Maximum Anticipated Pressures I ig (see 20 AAC 25.035) Maximum Hole Angle: 115 degrees Downhole: 4502 ' / Surface: 3535 18, Casing Program: Specifications Top - Setting Depth - Bo ICement Quantity, c.f. or sacks Hole Casino Weiaht Grade COLD11no Len th MD TVD TVD(including stage data 8-1/2"x9-718" 7" 26# L-80 VamTop HC 5841' 9850' 6110' 1 04f 1 9680' 278 sx Class'G' 6-1/8" 4-1/2" 12.6# 13C 85 Varn HTTC 4156' 1 15541' 9553' 97' 10114' 473 sx Class'G' 19 PRESENT WELL CONDITION SUMMARY (To be pD419704or Redrill and Re -Entry Operations) Total Depth MD (ff): Total Depth TVD (ft): Plugs (measured): Effect. qe th ): Effect. Depth TVD (ft): Junk (measured): 18517 9426 None /184 9368 None Casing Length Size qtqkit Volume MD TVD Conductor/Structural 80 20^ t60ctfc Set (Aoprox.) 34-114 34-114 Surface 5765 13-3/8" ±WFIE, 375 sx Class'G' 33-5796 33-4137 Intermediate 12406 9-5/8" h,400 s ss'G', 185 Bbls AS 1 30-12436 30-7353 Production Liner 6281 7' x 4-12" f 12236 -18517 7251 -9426 150 Bbls Class' Perforation Depth MD (ft): 17970 - 18430 erforation Depth TVD (ft): 9082-9311 Hydraulic Fracture planned? Yes ❑ No m 20. Attachments Property Plat ❑ BOP Sketch m Drilling Program ® Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commissyn Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure pproved herein will not be deviated Contact Name Sperry. Nathan from without prior written approval. Authorized Name Allen, Kenneth W Contact Email Nathan.SperrvAbp.com Authorized Title Engineering Team Lead Contact Phone 907-564-4258 Authonzed Signature Date Commission US6 Only/ Permit to Drill API. _ 029-22491-02-00 Permit Approval Date: See cover letter for other Number. 17--�S requirements: Conditions of approval : If box is checked, witil may not be used to explore for, lest, or produce coalbed me/thane, gas hydrates, or gas contained in shales: J Other:062 Samples req'd: Yes ❑ No E7 Mud log req'd: Yes ❑ No 42_ Yes W No ❑ Directional svy req'd: Yes @/ No ❑ pi pi vlw� pre- reki /oz'4kxieasure Spacing exception req'd: Yes ❑ No Inclination -only svy req'd: Yes ❑ No Post initial injection MIT req'd: Yes Cl No APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: Form 10.401 Revised 5/2017 This permit is valid for 24 monthsfrpm�tt�af bf gp1rdx�l(?p�4�C 25.005(gO Submit Fors anouplicate &"7 by To: Alaska Oil & Gas Conservation Commission From: Nathan Sperry, ODE Date: November 1, 2017 RE: NK -08B Permit to Drill The NK -08B well is scheduled to be drilled by Parker 272 in March 2018. This sidetrack well is a horizontal producer targeting the Sag River sands. The planned well is a two string sidetrack exiting the existing 9-5/8" casing, installing 7" intermediate liner, and installing 4-1/2" production liner. The intermediate liner will be set at the top of the Sag River, and the production interval will be completed with a solid liner that will be fully cemented. The maximum anticipated surface pressure from the Sag with a full column of gas from TO to surface is 3,535 psi (assumes 8.95 ppg EMW most likely pore pressure and a 0.1 psi/ft gas gradient). The well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3 rams and an annular). The BOP rams and annular will be tested to 4,000 psi. A detailed operations summary is included with the permit-ap cation. If there are any questions concerning information on NK -08B, please do not hesitate to use the contact information below. Nathan Sperry Office: (907) 564-4258 Attachments: Well Bore Schematic Proposed Pre -Rig Schematic Proposed Completion Directional Package BOPE Schematic Cell: (907) 268-8416 Email: nathan.sperrvCrD_bp.com As -Staked Survey Area Review Map Well Head Schematic Tree Schematic NK -08B PTD 1 11/1/2017 Planned Well Summary Well NK -086 Well Type Producer Target Sag Objective Current Status Shut-in Estimated Start Date: 3/1/2018 Time to Com tete: 34.1 Days Location 1 5.979.798.60 1 721.465.30 1 1266.1' FSL / 1099.2' FEL • 1 12N 15E Sec 36 Planned KOP: Directional Northing Easting TVDss Offsets TRS Tgt 1 5,988,290 716,804 9,769 669.0' FNL / 226.5' FEL 12N 15E Sec 26 - TSAD Rig: Parke Survey Program: 9,905' to 10,400'= BLIND 10,400' MD to TO = MWD+IFR+MS-WOCA Tgt 2 5,989,470 720,295 10,047 408.2' FSL ! 1981.8' FEL 12N 15E Sec 24 - TD Planned KOP: Directional 10,000' MD Planned TD: 19,697' MD / 10,047' TVDss -•115° in the production section None. All offset wells pass BP anti -collision scan criteria, but some offsets Close Approach Wells: I GL -RT: 47.1 Collision Issues" section. 6.05 - RTE ref MSL : 1 66.05=- Rig: Parke Directional - Baker WP03 KOP: I 10,000' MD Maximum Hole Angle. -640 in the intermediate section -•115° in the production section None. All offset wells pass BP anti -collision scan criteria, but some offsets Close Approach Wells: must be shut-in to pass scan criteria. Reference "Subsurface and Anti - Collision Issues" section. Surface to 9,905' MD = GYRO Survey Program: 9,905' to 10,400'= BLIND 10,400' MD to TO = MWD+IFR+MS-WOCA Nearest Property Line: 0' - The well straddles the Raven Pool Boundary Nearest Well within Pool: -2,161' - NK -08B PTD 2 11/1/2017 Formation Tops and Pore Pressure Estimate (SOR) Form. Depth (TVDss) Pore Pressure (ppg) Frac Gradients (Pp ) UG1 5974 9.1 13.54 KOP 6118 9.1 13.56 OA 7001 9.1 13.69 CM3 7197 10 14.18 CM2 8480 10.1 14.42 CM1 8678 10.5 14.65 THRZ 8909 10.5 17.55 Kuparuk 9133 8.79 13.84 TKNG 9338 10.4 17.61 TSGR 9609 8.95 13.98 TSHU 9699 8.81 17.21 TSAD 9769 8.82 13.93 Ivishak Z4 10000 8.75 13.92 1iAkAt,441 /7 NK -08B PTD 3 11/1/2017 Casing/Tubing Program Hole Size Liner / WUFt Grade Conn Length Top Bottom 8.5-9.5 TbgO.D. 1 20-30 1 <5 <10 <20 8.5-9.5 MDITVDss MDITVDss 8-1/2 x 7" 26# L-80 VamTop HC 5,841' 9,850'/ 6,051' 15,691' / 9,613' 9-7/8" (150' lap) 6-1/8" 4'/:" 12.6# 13Cr Vern HTTC 4,156' 15,541'19,487' 19,697'/ 10,048' (150'la ) Tubing 4'/:" 12.6# 13Cr VamTop 15,546' Surface 15,546'/ 9,491' (-5' into liner TBS) Mud Program Intermediate Mud Properties: LSND 9-7/8" Hole Section Depth Interval Density PV (cp) 1YP 1 P API FL HTHP FL MBT pH 10,000' MD - 12,426' MD CM3 9.4-10A " 10-15 20-30 1 <8 NA <20 8.5-9.5 12,426' MD - 15,691' MD 1 10.3 -11.5 -1 10-15 1 20-30 1 <5 <10 <20 8.5-9.5 Production Mud Proerties: Water Based Polymer Fluid 6-1I8" Hole Section Depth Interval Density py (cYP p)Ib/ API FL HTHP FL MBT pH OOft 15,691' MD - TD 9.2 - 9.8- <8 12-20 <12 NA <4 8.5-9.5 Logging Program 8-1/2" x 9-7/8" Intermediate Sample Catchers - as required by Geology Drilling: Dir/GR/RES Oen Hole: None Cased Hole: None 8-1/8" Production Sample Catchers -as required by Geology Drilling: li Dir/GR/RES/NEU Open Hole: I None Cased Hole: I None NK -08B PTD 4 11/1/2017 Cement Program D° 157,,3`Q, Zo Casing Size 7" 26# L-80 amTop Intermediate Liner Lead N/A Lead TOC N/A Basis Tail Oen hole volume + 30% exce + 80 ft shoe track Offset Well Details Tail TOC 1300 ft MD above To Ku aru Spacer -40 bbls of Viscosifed Spacer weighted to -12.0 Mud Push II Total Cement Lead N/A Volume Tail 57.6 bbls, 323 cult, 278 sks 15.8 b/cial Class G - 1.16 cuft/sk - NK -02 and all of its laterals have been permanently abandoned with Temp BHST201°F Casing Size 4-1/2" 12.6# 13Cr VamTop Production Liner Lead N/A Lead TOC N/A Basis Tail Oen hole volume + 30% excess + 80 ft shoe track + 200' of 4" DP by 7" liner annulus Offset Well Details Tail TOC Top of the liner Spacer -20 bbls of Viscosified Spacer weighted to -11.0 Mud Push II Total Cement Lead N/A Volume Tail 97.9 bbls, 548.3 cuft, 473 sks 15.8 lb/gal Class G -1.16 cuft/sk - NK -02 and all of its laterals have been permanently abandoned with Temp BHST 206" F Surface and Anti -Collision Issues Surface Close Proximity: No wells will be affected by the Parker 272 rig shadow. Anti -Collision: All offset wells pass BP anti -collision scan criteria. The following table details the wells that fail major risk and how the risk will be mitigated. Offset well ownership information All offset wells identified within 200 ft of the proposed wellbore are operated by BP. NK -088 PTD 5 11/1/2017 Interval of Well Close Risk Basis Offset Well Details Name Approach - NK -02 and all of its laterals have been permanently abandoned with NK -02 Intermediate 1/200 cement. Collision with NK -02 would not create an HSSE hazard. - NK -02 and all of its laterals have been permanently abandoned with NK -02A Intermediate 1/200 cement. Collision with NK -02 would not create an HSSE hazard. - NK -02 and all of its laterals have been permanently abandoned with NK-02APB1 Intermediate 1/200 cement. Collision with NK -02 would not create an HSSE hazard. - NK -11A was sidetracked in 2002. The sidetrack experienced multiple NK -11A Intermediate 1/200 issues and the well was T&A'd with cement. Collision with NK -11A would not create an HSSE hazard. - NK-11APB1 is an open hole plugback that was created when NK- NK-11APB1 Intermediate 1/200 11A was sidetracked. Collision with NK-11APB1 would not create an HSSE hazard. - NK -12A was sidetracked to NK -12B in 2004. NK -12A was P&A'd as NK -12A Intermediate 1/200 part of the NK -12B sidetrack prep. Collision with NK -12A would not create an HSSE hazard. Offset well ownership information All offset wells identified within 200 ft of the proposed wellbore are operated by BP. NK -088 PTD 5 11/1/2017 Hydrogen Sulfide r NK is considered an H2S site. Recent H2S data from the pad is as follows: Faults Formation Where Fault Encountered Well Name I H2S Level Date of Reading #1 Closest SHL Well 1-12S Level NK -29 70 07/29/2017 #2 Closest SHL Well H2S Level NK -28 0 10/06/2000 #1 Closest BHL Well H2S Level NK -14B 50 07/09/2017 #2 Closest BHL Well H2S Level NK -38B 50 07/08/2017 #3 Closest BHL Well H2S Level NK -43 0 05/06/2001 #4 Closest BHL Well H2S Level NK -08A 50 07/05/2017 Max Recorded H2S on Pad/Facility NK -62A 750 1/16/2006 Faults Formation Where Fault Encountered MD Intersect TVDss Intersect Throw Direction and Magnitude Lost Circ Potential Fault #1 17,382' 9,750 20-30 feet DTN Low Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB Environmental Advisors (659-5893) for guidance. NK -08B PTD 6 11/1/2017 Well Control The 8-1/2" x 9-7/8" hole section will be drilled with well control equipment consisting of 5,000 psi working pressure rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 4,000 psi. BOP test frequency for NK -08B will be 7 days until the window is milled and then will be 14 days with function test every 7 days. Except in the event of a significant operational issue that may affect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. 8-1/2" x 9-7/8" Intermediate Interval Maximum anticipated BHP 4,502 psi in the Sag at 9,675' TVD 8.95 ppg EMW Maximum surface pressure 3,535 psi at the TSGR 0.10psi/ft gas gradient to surface Kick tolerance 25 bbls with 11.9 ppg frac gradient. Kick tolerance Assumes 8.95 ppg pore pressure in the SGR + 0.5 ppg kick Integrity Test - 6-1/8" hole intensit and 10.7 ppg MW. Planned BOP test pressure Rams test to 4,000 psi / 250 psi. Planned completion Fluids Annular test to 4,000psi/ 250 psi Integrity Test - 9-7/8" hole LOT after drilling 20'-50' of new hole 9-5/8" Casing Test 4,000 psisurface pressure 6-118" Production Interval Maximum anticipated BHP 4,502 psi in the Sag at 9,675' TVD 8.95 ppg EMW Maximum surface pressure 3,535 psi at the TSGR 0.10psi/ft gas gradient to surface Kick tolerance Greater than 25bbls with >9.8 ppg frac gradient. Assumes an 8.81 ppg max pore pressure in the Ivishak + 0.5 ppg kick intensity and 92 ppg MW. Planned BOP test pressure Rams test to 4,000 psi / 250 psi. Annular test to 4,000 psi / 250 psi Integrity Test - 6-1/8" hole FfT after drilling 20'-50' of new hole 4-1/2" Liner Top Packer 4,000 psi surface pressure Planned completion Fluids -9.2 to 9.4 ppg brine / 2,000 it TVD diesel NK -08B PTD 7 11/1/2017 Drill and Complete Operations Summary Pre -rig Work 1. Squeeze perfs with a minimum of 10 bbls 15.8ppg class G (minimum TOC will be 100' above the shallowest perforation). 2. Tag and confirm TOC. Drift for jet cut. 3. Jet cut tubing at -10,000' MD (cut depth pending collar locations from MTT log). 4. WIT TxIA to 4,000 psi. 5. Set and test TWC. Proposed Drilling Operations 1. MIRU Parker272. 2, Test TWC from above and below to 4,000 psi psi for 5 minutes each. 3. Nipple down tree. Nipple up BOPE and test to 4,000 psi. (Configured from top to bottom: 13- 5/8" annular preventer, 2-7/8" x 5" VBRs in the upper cavity, blind/shear rams, mud cross and 2-7/8" x 5" VBRs in the lower cavity). a. Test rams and annular to 250 psi / 4,000 psi with 4" and 5" test joint. b. Notify AOGCC 24 hrs in advance of full test. 4. Pull TWC with lubricator. 5. RU hard lines to BOP. Circulate out diesel freeze protection and displace well to clean seawater. 6. Pull tubing from the pre -rig cut. 7. Optional., Perform 9-5/8" cleanout run to tubing stub. 8. Change IC packoff (FMC). 9. PU 9-5/8" whipstock, bottom trip anchor, and 8-1/2" window milling assembly (to include full gauge string mills). RIH to top of tubing stub, orient, and set whipstock at 10,000' MD. 10. Swap wellbore over to 9.5 ppg LSND milling fluid. Drill 8-1/2" x 9-7/8" Intermediate Hole 11. Mill window in 9-5/8" casing plus 20'-40' (depending on next assembly) of new formation. 12. Pull into the window and perform LOT. Minimum LOT required is 11.9 ppg EMW for 25 bbl kick tolerance. 13. Pull out of the hole for drilling BHA #1. 14. MU 8-1/2" motor assembly and drill until three consecutive clean surveys are obtained. 15. Pull out of the hole. Make up 8-1/2"x 9-7/8" drilling RSS BHA #1 w/ MWD/RES/PWD/near-bit GR and RIH. 16. Kick off and drill 8-1/2" x 9-7/8" intermediate interval per the directional plan to TSGR TD of -15,691' MD. 17. At TD, circulate until wellbore is clean. 18. Perform short trip to the window. 19. Run in the hole to TD, circulate the wellbore clean and pull out of the hole on elevators. Run & Cement 7" Intermediate Liner 20. Change upper 2-7/8" x 5" VBRs to 7" fixed rams and test to 250 psi low / 4,000 psi high for 5 min each. 21. Run 7", 26# L-80, VamTop HC liner to TD, with 150' liner lap into 9-5/8" window. 22. Cement liner with 15.8 ppg Class G tail cement. Circulate excess cement above TOL. Plan for TOC to be 1,300' above TKUP. 23. Set liner top packer and liner hanger. Pull out of the hole and lay down the liner running tool. NK -08B PTD 8 11/1/2017 24. Change upper 7" fixed rams to 2-7/8" x 5" VBR's and test to 250 psi low / 4,000 psi high for 5 min each. 25. Test 7" liner to 250 psi low for 5 min / 4,000 psi high for 30 min after cement has reached a minimum 500 psi compressive strength. Drill 6-1/8" Production Hole Section 26. Make up the 6-1/8" drilling BHA with MWD/GR/RES and RIH. 27. Run in the hole and tag landing collar. 28. Displace wellbore to 9.2 ppg QuikDril-N. 29. Perform a flowcheck on 7" liner (no flow test). 30. Drill shoe track and 20 ft of new formation. Pull above shoe and perform FIT. Minimum FIT required is 9.8 ppg EMW for >25bbls KT. 31. Drill 6-1/8" production interval per the directional plan to TD of -19,697' MD. 32. At TD, circulate until the wellbore is clean. 33. Perform short trip to the shoe. 34. Run in to TD, circulate the wellbore clean and pull out on elevators. 35. Lay down excess drill pipe and BHA. Run 4-1/2" Production Liner & Perforate 36. Run 4-1/2", 12.6 ppf, 13Cr, VamTop production liner to TD with 150 ft liner lap into 7" casing. 37. Fully cement the liner. 38. Set liner hanger and liner top packer. 39. Displace wellbore to clean 9.2ppg brine above the top of the liner. 40. Pull out and lay down the liner running tool. 41. Pressure test 9-5/8" casing x 7" liner x 4-1/2" liner envelope to 250 psi low for 5 min / 4,000 psi high for 30 min. 42. Run in and perforate liner. Perforate with HES 2-7/8" MaxForce perf guns (1,600' planned). Run 4-1/2" Completion 43. Rig up and run 4-1/2", 12.6# 13Cr VamTop completion per the tally. Tag up in PBR, space out, and land tubing hanger. Run in the lockdown screws. 44. Displace tubing and IA to clean brine. 45. Reverse circulate in heated brine and inhibited brine to IA and tubing (surface to surface). 46. Drop ball & rod and set production packer. Individually test tubing and IA to 250 psi low for 5 min / 4,000 psi high for 30 min. 47. Hold pressure on the IA and bleed tubing pressure down to shear the DCR valve. Pump both ways to confirm circulation ability. 48. Reverse circulate in diesel freeze protect down IA using rig's injection pump to freeze protect IA and tubing to 200' TVD below BPRF. 49. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm well is dead. ND/NU 50. Install TWC and test from above and below to 250 psi low / 4,000 psi high for 5 minutes each. NK -08B PTD 9 11/1/2017 51. Nipple down the BOPE. Nipple up the adapter flange and double master valves. Test to 250 psi / 5,000 psi for 5 minutes each with diesel. 52. Ensure Heet is left on top of TWC and only diesel is left in the tree. 53. Install all annulus valves and secure the well. Release Rig 54. Rig down Parker 272. 55. Move rig off location. Post -Rig Operations 1. Change out dry hole tree for production tree. 2. Pull TWC, ball and rod, and RHC plug. Pull shear valve and install GLV's. 3. Flowback, per ASRC. 4. Install flow lines and well house. NK -08B PTD 10 11/1/2017 NK -08B Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures A. Intermediate Hole: The formation pressure at the KOP is expected to be 9.1ppg. The formation pressure will be controlled with a 9.4 — 10.5ppg. The CM3, CM2 and CM1 are expected to be at 10.0 to 10.5 ppg EMW. Formation pressures will be controlled with a 10.7 — 11.1 ppg mud weight. C. Production Hole: The Sag is expected to be at an 8.95 ppg EMW. Reservoir pressures will be controlled by using 9.1 — 9.8 ppg water based mud. II. Lost Circulation/Breathing A. Intermediate Hole: There are no expected fault crossings in the intermediate hole. However, breathing has been known to occur in the Colville on other Drill Sites in Prudhoe Bay as a result of high ECD's. B. Production Hole: There is 1 expected fault crossing in the production hole with a low risk of lost circulation. III. Fault Locations =Formation Where countered MD Intersect TVDss Intersect Throw Direction and Magnitude Lost Circ Potential Fault #1 17,382' 9,750 20-30 feet DTN Low IV. Integrity Testing Test Point Test Depth Test type EMW (lb/gal) 9-5/8" Window 20'-50' from the 9-5/8" shoe LOT 11.9 ppg 7° shoe 20'-50' from the 7" shoe FIT 9.8 NK -08B PTD 11 11/1/2017 V. Hydrogen Sulfide NK is considered an H2S site. Recent H2S data from the pad is as follows: VI. Anti -Collision Issues i None. All offset wells pass BP Anti -collision Scan Criteria. CONSULT THE NK PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. NK -088 PTD 12 11/1/2017 Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level NK -29 70 07/29/2017 #2 Closest SHL Well H2S Level NK -28 0 10/06/2000 #1 Closest BHL Well H2S Level NK -14B 50 07/09/2017 #2 Closest BHL Well H2S Level NK -38B 50 07/08/2017 #3 Closest BHL Well H2S Level NK -43 0 05/06/2001 #4 Closest BHL Well H2S Level NK -08A 50 07/05/2017 Max Recorded H2S on Pad/Facility I NK -62A 750 1/16/2006 VI. Anti -Collision Issues i None. All offset wells pass BP Anti -collision Scan Criteria. CONSULT THE NK PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. NK -088 PTD 12 11/1/2017 TREE= 4-1116'CIW5M WELLHEAD= FMC ACTUATOR= BAKER DKB. ELLV = 60.8' REF aTV = 52-83' 3F. ELEV = 22.1T <OP= 900' Max An& = 78' @ 14657 Datum MID 18248' Datum TVD = 9200'SS 1 13-3/8• GSC, 66#, P480, NSCC, D = 12 415• 1 Minimum ID = 3.725" @ 12329' 4-112" HES XN NIPPLE 2- TBG, 12.6#, L-80 IBT-M, D = 3.958' —1 12342' I7' LNR 29#, ?HYD 511, .0371 bpf, D = 6.184' — 12343' TOP OF 4-12' LN 12344' PEFfURATDN SU#AARY REE LOG: SWS M3MORY GR/OCI- ON 04/06/01 ANGLE AT TOP PEW 52`01797V NDte: Refer to Production DB for Nstorlcal pert data SIZE SPF INTERVAL Opn/Sgz DATE 2-12' 6 1797D-18070 O 04106/01 2-12' 6 18090 - 18130 O 04/06/01 2-12' 6 18150 - 18230 - O 04/06/01 2-12' 6 18240 - 18300 O 04/06/01 2-12' 6 18315 - 18340 O 04/06/01 �®J !- FES FMX TRSSSV fes, D = 3.813' GAS LIFT MANDRELS ST ND TVD DLV TYPE VLV LATCH PORT LATE 3 3572 3033 55 A*K" M OOtr£ RK 16 0422/12 2 8403 5433 61 bM' M DOME RK 16 0422/12 1 12198 7232 59 MMiM SO RK 24 0422/12 12236' H 9-5/8' X 7' BKR ZXP TKR D = 7500' 12253' 9-5/8' X 7- BKR HYD LNR HCR D = 6.2 12264' 4-12' HES X NP, D = 3.813' 12285' 08/31194 ORIGINAL COMPLETION 7' X 4-1/2' BAKER S-3 PKR D = 3.875' 04109101 F8G SIDETRACK (N408A) 12308' 4-12' HFS X NP, D = 3.813' 12329' 10/09105 RPWMH WAIVER SFTY NOTE DELETED 4-12- FES XN NP, ID 09/08/06 CS/PJC ND' MD DATUM COMECTIONE 4-12' VVLEG, D = 3.958' 12342' f3.MD TT NOT LOGO 1i 2343 7- X 4-12' XO. D = 3.938- 9-5/8' MLLOUT VVrDOW TOP @ 12436' WHIPSTOCK SET ON TOP OF CSP 12462' H 9-5/8' (DBP - SET 03/22/01 5/8' CSG, 47#, NT-BOS NSCC, D = 8.681- 13220' \ PB7D 18429' 7-5/8' CSG, 29.7#, STL NSCT, D = 6.875' 15898' 4-12' LNR 12.6#, L-80, HY DRL 521, .0152 bpf, D = 3.918' NIAKLK LUT WELL W -08A PBZMT ND: `2010290 AR ND: 50-029-22491-01 SO-- 36, T12K R15E 1266' NSL, 1099' WB - DATE REV BY COMMENTS DATE REV BY COMMENTS 08/31194 ORIGINAL COMPLETION 02118111 MB/JMD ADDED SSSV SAFETY NOTE 04109101 F8G SIDETRACK (N408A) 05/04/12 M3M'JIMD GLV C/O (0422112) 10/17/04 GRCfTLH CORF ECTIOFS 05/04/12 JAD CSG DEPTH 8 WETS 10/09105 RPWMH WAIVER SFTY NOTE DELETED 0921117 JNJJM) ADDEDOKB, REE, 8 BFE 09/08/06 CS/PJC ND' MD DATUM COMECTIONE BP Expioration (Alaska) 01/04107 GJF/TLH GLV C/O (1226106) TREE= 4-1/16* CJW5M VALLHEAD= FMC ACTUATOR= BAMP KB. aEV = 52.83' BF. ELEV= 19.6' KW= 900' Max Angla = 78' @ 14652' Datum M)= 18248' DalumTVD= 92W SS 133/8" CSC, 68#, N-80, NSOC, D =12.415" �� 5806• —� Cut tubing at -10,00'- MD Minimum ID = 3.725" @ 12329' 4-1/2" HES XN NIPPLE TBG, 17"LNR29#,7HYD511,.0371bpf,D=6.184" I PERFORATION SUI„641RY REF LOG: SNS R134D Y GRIOCL ON 04/06/01 ANGLE AT TOP PE#: 52'@ 1797V Note: Refer to Reduction DB for historical perf data SIZE SPF NTERVAL OpnISgz DATE 2-1/2" 6 17970- 18070 S 04/06/01 2-1/2" 6 18090-18130 S 04/06/01 2-111 6 18150 -18230 S 04/06/01 2-1/2" 6 18240-18300 S 04/06/01 2-112" 6 18315 - 18340 S 04/06/01 NT -80S NSCC, D= 8.681' 13220' 1 7-5/8" CSG, 29.7#, STL NSCT, D = 6.875" I 2' HES FMX TRSSSV NP, D = 3.813" GAS LFr MANDRELS ST MD TVD I DEVI TYPE I VLV LATCHI PORT DATE 3 3572 3033 55 MM -M Durmy RK 16 04122/12 2 8403 5433 61 MdGM 1 Dumny RK 16 04122/12 1 12198 7232 59 M IG -M Dun" RK 24 04122/12 12236' 19-5/8" X 7" BKR ZXP R(R D = 7.500" 12253' 9-518" X 7" BKR HYD INR HGR D = 6.276" 12264' 4-12" HES X NP, D = 3.813" 122BW 7'X 4-12' BAKER S3 PKR D = 3.875" 12308' 4-12'HMXNP,1D=3.813" 12329' 4-12" HES XN NP, D = 3.725' 12342' 4-12' WLEG, D=3.958' 09/08/06 CSIPJC TVD/hUDkTUMCOMWLjM T3.MD TT NOT LOGGED 12343' T X 4-12" XO, D= 3.838" 9.5/8'MLLOUT VV DOW TOP@ 12436' 12462' H 9-5/8'cBP-SET 0322/01 Top of 4-1/2" annulus cement to 16,254'w/ 30% washout (4/2/01) Pre -rig TOC to 17,870' MD minimum M:.119M LW 12.6#, L-80, HYDRL 521, Iy 18$17 W. D = 3.918" NAKLIC LW WELL W -08A FEMAT ND: 1010290 AH No: 50-029-22491-01 SEC 36, T12N R15E, 1266' NSI, 1099' VYa DATE REV BY COMNBNBS DATE I REV BY I 08/31/94 ORIGINAL COMPLEnON 02/1 B/11 MBIJMD ADDED SSSV SAFETY NOTE 04/09/01 RIG SIDETRACK(NK-C 05/04/12 M3MJMD GLV CIO (0422/12) 10/17/04 GROTW TX*S 05/04112 JMD CSG DEPTH 8 WBS 10/09/05 EBFVTLH WANEt SFTY NOTEDf3ETID 08124/17 NS Ropmed Re -Mg 09/08/06 CSIPJC TVD/hUDkTUMCOMWLjM SP Fxplora8on (Alaska) 01/04/07 GIF/TLH GLV C!O (12126!06) 71JE= 4-1/16" aW 5M I PROP©SErD WEIFEND= fMC ACTIAATOR= BAKER KB. 0" = 52.83' BF. B_EV = 19.9 KOP= 900 Max Angle= —'@' Datum MD= Datum TVD= 9200 SS 1 13-3/8" CSG, 68#. N -OD, PSCC, D =12.475" I ITOPOF7"LNR! 886W Minimum ID =_" @ 9-5/8" SLB VYFIIP"TOCK SG, 47#, NT -80S NSCC, D = 8.881" A i#)e Pae- ke,- -/s3y'� TBG,12-6#,13-CRVAMTOP, H 15541' 1\ bpf, ID = 3.958" TOPOF4-1/2"LNi 1564V D = 6276" PERFORATION SLPAWRY REF LOG: SWS NINORY GfLCCL ON 04/06/01 ANGLEAT TOP PERF 52- @ 17971Y Note: Refer to Production DB for historical pert data S17E SFF WERVAL Opn/Sgz I DATE PBTD 41/2" LNR 12.6#,13 -CR, VAM TOP, .0152 bpf, D = 3.958" > SCS.SV NP, D= GAS LIFT MAPDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 7 6 5 4 3 2 1 19-5/8" X 7" LTP w / HGR D = I HES X PP. D=3.813" 7" X 4-1/2" BAKER S-3 PKR D = 3.875- 4-1/2- HES X NP. D= 3.813" MLLOUT MDOW (NK -08A) 10000' - iJ rP� %C A;1, I 16641• I�a-ur wl cam. D= ass6" I ELMD TT NOT LOGGED DATE REV BY OOMMH4TS DATE RE/ BY CONVENTS 08/31194 ORIGINAL COMPLETION 04/09!01 1111Pa SIDETRACK (N408A) _I I_ TaG SIDETRACK(NK-)8B) 0&29/17 NO BUILT PROPOSED NAKLK LW WELL N-08 PERW No ARM: 50-029-22491-02 SEC 36, T12N, R75E, 1266' NSL, 1099' WEL SP Exploration (Alaska) by North America - ALASKA - BP Niakuk NK Main Pad NK -08 Plan NK -08B Plan: NK -08B WP03 BP Well Plan Survey Report 01 November, 2017 BA ER F IGHES BAT GE company by NK Main Pad, TR -12-15 BP BA ER Grid Convergence: Northing: BP Well Plan Survey Report F�UcE GHES v w Company: North America - ALASKA - BP Local Co-ordinate Reference: Well NK -08 Project: Niakuk TVD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Site: NK Main Pad MD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Well: NK -08 North Reference: True Wellbore: Plan NK -08B Survey Calculation Method: Minimum Curvature Design: NK -08B WP03 Database: EDM RSK- Alaska PROD -ANCP1 Project Niakuk, GPMA, NIAKUK Map System: Alaska NA027 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27 ' OGP-Usa AK / Alaska zone 4 (26734°1586, Using geodetic scale factor Site NK Main Pad, TR -12-15 Longitude: Site Position: Grid Convergence: Northing: From: Map Easting: Position Uncertainty: 0.00 usft Slot Radius: Well NK -08, NK -08 0.00 Well Position +N/ -S 0.00 usft Northing: +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore Plan NK -08B Magnetics Model Name Sample Date Declination (°I BGGM2017 5/1/2018 17.52 Design NK -08B WP03 Audit Notes: Version: Vertical Section. 5,981,257.790 usft 714,553.260 usft 0.000 in 5,979,796.600 usft 721,465.300 usfl 22.17 usft Dip Angle 81 04 Latitude: 70° 21'5.879 N Longitude: 148° 15'27.984 W Grid Convergence: 1.64 ° Latitude: I 70° 20'49.555 N Longitude: 148° 12'7.308 W - Ground Level: 19.10 usft Field Strength (nT) 57,481 Phase: PLAN Tie On Depth: 9,905.25 Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (I 43.88 000 0.00 354.80 11/112017 10:12:48AM Page 2 COMPASS 5000.1 Build 81D Company: North America - ALASKA -BP Project: Niakuk Site: NK Main Pad Well: NK -08 Wellbore: Plan NK -08B Design: NK -088 WP03 Survey Tool Program Date 90/2017 From To (usft) (usft) Surrey (Wellbore) 105.25 9,905.25 1 Gyrodata gyrocompassing m/ (NK -08) 9,905.25 10,400.00 NK -08B WP03 (Plan NK -08B) 10,400.00 15,692.00 NK-OBB WP03 (Plan NK -08B) 10,400.00 15,692.00 NK -08B WP03 (Plan NK -08B) 15,692.00 19,697.01 NK-OBB WP03 (Plan NK -08B) 15,692.00 19,697.01 NK -088 WP03 (Plan NK -08B) Planned Survey Well NK -08 MD Inc NK-OBB Plan @ 66.05usft (P272 PLAN) (usft) (°) NK -088 Plan @ 66.05usft (P272 PLAN) 9,905.25 63.22 TIP Minimum Curvature 10,000.00 63.48 KOP-9618" -4,796.29 10,016.00 63.50 Start 20.00 hold at 10016.00 MD 10,036.00 63.50 Start DLS 3.50 TFO 85.00 5,984,932.426 10,100.00 63,32 10,200.00 63.14 10,300.00 63,07 10,400.00 63.10 10,456.00 63.16 Start 800.00 hold at 10458.00 MD 10,500.00 63.16 10,600.00 63.16 10,700.00 63.16 10,800.00 63.16 10,900.00 63.16 Azi (azimuth) 1°1 31765 317.82 320.05 320.05 322.55 326.47 330.39 334.32 336.51 336.51 336.51 336.51 336.51 TVD (usft) 6,141.43 6,183.93 6,191.08 6,200.00 6,228.65 6,273.70 6,318.95 6,364.24 6,389.55 6,409.41 6,454.56 6,499.70 6,544.84 6,589.98 BP BAKER BP Well Plan Survey Report UGHES ace�onva�y Tool Name GYD-GC-MS BLIND MWD MWD+IFR+MS-WOCA MWD MWD+IFR+MS-WOCA TVDSS (usft) 6,075.38 6,117.88 6,125.03 6,133.95 6,162.60 6,207.65 6,252.90 6,298.19 6,323.50 6,343.36 6,388.51 6,433.65 6,478.79 6,523.93 Local Co-ordinate Reference: Well NK -08 TVD Reference: NK-OBB Plan @ 66.05usft (P272 PLAN) MD Reference: NK -088 Plan @ 66.05usft (P272 PLAN) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K- Alaska PROD - ANCP1 Description Gyrodata gyrocompassing mis Blind drilling MWD - Standard MWD + IFR + Mulb Station W/O Crustal MWD - Standard MWD + IFR + Multi Station W/O Crustal NIS ENY Northing (usft) (usft) (usft) 5,14264 4,729.93 5,984,803.999 5,210.31 -4,786.88 5,984,864.956 5,221.10 -4,796.29 5,984,875.467 5,234.82 -4,807.78 5,984,888,843 5,279.49 -4,843.55 5,984,932.426 5,352.16 -4,895.38 5,985,003,535 5,428.12 -4,942.06 5,985,078,080 5,507.09 -4,983.42 5,985,155.784 5,552.51 -5,004.20 5,985,200.570 5,588.52 -5,019.85 5,985,236.099 5,670.35 -5,055.41 5,985,316.847 5,752.19 -5,090.98 5,985,397.594 5,834.03 -5,126.54 5,985,478.342 5,915.87 -5,162.10 5,985,559.089 Easting (usft) 716,585.543 716,526.764 716,512045 716,505.154 716,468.074 716,414.129 716,365.227 716,321.551 716,299.437 716,282.733 716,244.769 716,206.805 716,168.840 716,130.876 DLeg (°1100usft) 0.00 0.32 12.50 0.00 3.50 3.50 3.50 3.50 3.50 0.00 0.00 0.00 0.00 0.00 TFace ) 0 D0 30.34 90.00 0.00 95.00 93.88 92.12 90.34 88.57 0.00 0.00 0.00 0.00 0.00 1111/2817 10:12:48AM Page 3 COMPASS 5000.1 Build 81D BP by BP Well Plan Survey Report �F�UGHES Emm, Company: North America - ALASKA - BP Local Coordinate Reference: Well NK -08 Project: Niakuk TVD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Site: NK Main Pad MD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Well: NK -08 North Reference: True Wellbore: Plan NK -08B Survey Calculation Method: Minimum Curvature Design: NK -08B WP03 Database: EDM RSK- Alaska PROD -ANCPI Planned Survey MD Inc Azi (azimuth) TVD TVDSS N/S EIW Northing Easting DLeg TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (°) 11,000.00 63.16 336.51 6,635.13 6,569.08 5,997.70 .5,197.66 5,985,639.837 716,092.912 0.00 0.00 11,100.00 63.16 336.51 6,680.27 6,614.22 6,079.54 -5,233.23 5,985,720.585 716,054.948 0.00 0.00 11,200.00 63.16 336.51 6,725.41 6,659.36 6,161.38 -5,268.79 5,985,801.332 716,016.983 0.00 0.00 11,256.00 63.16 336.51 6,750.69 6,684.64 6,207.21 -5,288.71 5,985,846.551 715,995.723 0.00 0.00 Start DLS 3.50 TFO 88.39 11,300.00 63.22 338.24 6,770.54 6,704.49 6,243.46 -5,303.81 5,985,882.334 715,979.553 3.50 88.39 11,400.00 63.42 342.15 6,815.45 6,749.40 6,327.50 -5,334.08 5,985,965.442 715,946.816 3.50 87.61 11,500.00 63.72 346.04 6,859.98 6,793.93 6,413.60 -5,358.81 5,986,050.774 715,919.754 3.50 85.86 11,600.00 64.13 349.91 6,903.94 6,837.89 6,501.43 -5,377.31 5,986,138.011 715,898.465 3.50 84.12 11,626.20 64.26 350.92 6,915.34 6,849.29 6,524.69 -5,381.24 5,986,161.146 715,893.852 3.50 8242 Start 1058.43 hold at 11626.20 MD 11,700.00 64.26 350.92 6,947.39 6,881.34 6,590.33 -5,391.73 5,986,226.444 715,881.427 0.00 64.88 11,800.00 64.26 350.92 6,990.83 6,924.78 6,679.28 -5,405.95 5,986,314.929 715,864.591 0.00 0.00 11,900.00 64.26 350.92 7,034.26 6,96821 6,768.23 -5,420.15 5,986,403.413 715,847.754 0.00 0.00 11,975.51 64.26 350.92 7,067.05 7,001.00 6,835.39 -5,430.89 5,986,470.227 715,835.042 0.00 000 OA 12,000.00 64.26 350.92 7,077.69 7,011.64 6,857.17 -5,434.38 5,986,491.898 715,830.918 0.00 0.00 12,100.00 64.26 350.92 7,121.12 7,055.07 6,946.12 -5,448.59 5,986,580.383 715,814.082 0.00 0.00 12,200.00 64.26 350.92 7,164.55 7,098.50 7,035.07 -5,462.81 5,986,668.868 715,797.245 0.00 0.00 12,300.00 64.26 350.92 7,207.98 7,141.93 7,124.02 -5,477.02 5,986,757.353 715,780.409 0.00 0.00 12,400.00 64.26 350.92 7,251.41 7,185.36 7,212.96 -5,491.24 5,986,845.838 715,763.573 0.00 0.00 12,426.80 64.26 350.92 7,263.05 7,197.00 7,236.80 -5,495.05 5,986,869.551 715,759.061 0.00 0.00 CM3 12,500.00 64.26 350.92 7,294.84 7,228.79 7,301.91 -5,505.45 5,986,934.323 715,746.736 0.00 0.00 12,600.00 6426 350.92 7,338.27 7,272.22 7,390.86 .5,519.67 5,987,022.808 715,729.900 0.00 0.00 12,684.63 64.26 350.92 7,375.03 7,308.98 7,466.14 -5,531.70 5,987,097.692 715,715.651 0.00 0.00 Start DLS 3.50 TFO 144.70 12,700.00 63.82 351.27 7,381.76 7,315.71 7,479.79 .5,533.84 5,987,111.275 715,713.109 3.50 144.70 11/12017 10.12.48AM Page 4 COMPASS 5000.1 Build 81D BP by BP Well Plan Survey Report �F�UGHES GE<ompany Company: North America - ALASKA - BP Project: Niakuk Site: NK Main Pad Well: NK -08 Wellbore: Plan NK -08B Design: NK -08B VVP03 Planned Survey MD Inc (usft) I°) 12,800.00 60.99 12,900.00 58.20 13,000.00 55.46 13,100.00 52.78 13,200.00 50.16 13,300.00 47.63 13,400.00 45.20 13,500.00 42.88 13,600.00 40.70 13,700.00 38.67 13,600.00 36.83 13,900.00 35.21 14,000.00 33.83 14,100.00 32.74 14,200.00 31.94 14,300.00 31.48 14,344.53 31.39 CM2 (Tuffs) 7,737.08 14,400.00 31.37 14,500.00 31.61 14,576.87 32.02 CMI ITuffs) 7,525.98 14,600.00 32.18 14,659.72 32.68 Tl -8K 140.81 14,691.82 33.00 Start 1000.00 hold at 14691.82 MD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well NK -08 NK -08B Plan @ 66.05usft (P272 PLAN) NK -088 Plan @ 66.05usft (P272 PLAN) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg TFace (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (°) 353.59 7,428.08 7,362.03 7,567.62 -5,545.54 5,987,198 717 715,698.819 3.50 144.55 356.04 7,478.70 7,412.65 7,653.49 -5,553.36 5,987,284.315 715,688.463 3.50 143.47 358.64 7,533.41 7,467.36 7,737.08 -5,557.27 5,987,367.750 715,682.079 3.50 142.23 1.42 7,592.03 7,525.98 7,818.08 -5,557.27 5,987,448.711 715,679.691 3.50 140.81 4.39 7,654.33 7,588.28 7,896.19 -5,553.34 5,987,526.896 715,681.308 3.50 139.18 7.61 7,720.07 7,654.02 7,971.11 -5,545.51 5,987,602.013 715,686.925 3.50 137.32 11.08 7,789.02 7,722.97 8,042.56 -5,533.80 5,987,673.781 715,696.519 3.50 135.21 14.85 7,860.91 7,794.86 8,110.29 -5,518.25 5,987,741.934 715,710.056 3.50 132.82 18.96 7,935.48 7,869.43 8,174.03 -5,498.93 5,987,806.217 715,727.485 3.50 130.10 23.43 8,012.45 7,946.40 8,233.55 -5,475.90 5,987,866.389 715,748.740 3.50 127.04 28.30 8,091.53 8,025.48 8,288.63 -5,449.26 5,987,922.228 715,773.743 3.50 123.60 33.57 8,172.42 8,106.37 8,339.06 -5,419.10 5,987,973.524 715,802.400 3.50 119.75 39.25 8,254.83 8,188.78 8,384.65 -5,385.53 5,988,020.085 715,834.604 3.50 115.48 45.31 8,338.45 8,272.40 8,425.24 -5,348.68 5,988,061.739 715,870.236 3.50 110.80 51.69 8,422.96 8,356.91 8,460.66 -5,308.69 5,988,098.330 715,909.162 3.50 105.73 58.29 8,508.06 8,442.01 8,490.80 -5,265.70 5,988,129.722 715,951.237 3.50 100.35 61.27 8,546.05 8,480.00 8,502.49 -5,245.64 5,988,141.995 715,970.945 3.50 94.73 65.00 8,593.41 8,527.36 8,515.53 -5,219.88 5,988,155.796 715,996.304 3.50 92.18 71.69 8,678.71 8,612.66 8,534.77 -5,171.40 5,988,176.457 716,044.196 3.50 89.00 76.73 8,744.05 8,678.00 8,545.78 -5,132.43 5,988,188.610 716,082.820 3.50 83.29 78.23 8,763.64 8,697.59 8,548.44 -5,120.44 5,988,191.627 716,094.732 3.50 79.00 82.01 8,814.05 8,748.00 8,553.93 -5,088.89 5,988,198.043 716,126.097 3.50 77.74 84.00 8,841.02 8,774.97 8,556.04 -5,071.62 5,988,200.671 716,143.304 3.50 74.55 11/1/2017 10:12:4aAM Page 5 COMPASS 5000.1 Build 81D Company: North America - ALASKA - SP Project: Niakuk Site: NK Main Pad Well: NK -08 Wellbore: Plan NK -08B Design: NK -0813 WP03 Planned Survey Well NK -08 MD Inc NK -086 Plan (03 66.05usft (P272 PLAN) (usft) 1°I NK -08B Plan (P 66.05usft (P272 PLAN) 14,700.00 33.00 14,793 21 33.00 TNR2 Sitt EDM R5K - Alaska PROD - ANCPI 14,800.00 33.00 14,851.63 33.00 THRZ (°) 14,900.00 33.00 15,000.00 33.00 15,100.00 33.00 15,118.72 33.00 Kuparuk 84.00 15,200.00 33.00 15,300.00 33.00 15,363.16 33.00 Kingak (LCUITJD) 0.00 15,400.00 33.00 15,457.35 33.00 TJC 5,988,208.553 15,500.00 33.00 15,511.01 33.00 TJB 8,909.00 15,599.25 33.00 TJA 716,229.559 15,600.00 33.00 15,686.29 33.00 TSGR 8,567.89 15,691.82 33.00 Start 35.00 hold at 15691.82 MD BP BA ER BP Well Plan Survey Report F�UGHES �°mram Local Coordinate Reference: Well NK -08 TVD Reference: NK -086 Plan (03 66.05usft (P272 PLAN) MD Reference: NK -08B Plan (P 66.05usft (P272 PLAN) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCPI Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg TFace O (usft) lush) (usft) (usft) (usft) (usft) (°HOOusft) (°) 84.00 8,847.88 8,781.83 8,556.51 -5,067.19 5,988,201.262 716,147.720 0.00 -148.56 84.00 8,926.05 8,860.00 8,561.81 -5,016.70 5,988,208.058 716,198.026 0.00 0.00 84.00 8,931.75 8,865.70 8,562.20 -5,013.02 5,988,208.553 716,201.691 0.00 0.00 84.00 8,975.05 8,909.00 8,565.14 4,985.05 5,988,212.318 716,229.559 0.00 0.00 84.00 9,015.61 8,949.56 8,567.89 4,958.85 5,988,215.844 716,255.663 0.00 0.00 84.00 9,099.48 9,033.43 8,573.58 4,904.69 5,986,223.135 716,309.634 0.00 0.00 84.00 9,183.35 9,117.30 8,579.28 4,850.52 5,988,230.425 716,363.605 0.00 0.00 64.00 9,199.05 9,133.00 8,580.34 4,840.38 5,988,231791 716,373.710 0.00 0.00 84.00 9,267.21 9,201.16 8,584.97 -4,796.36 5,988,237.716 716,417.576 0.00 0.00 84.00 9,351.08 9,28503 8,590.66 -4,742.19 5,988,245.007 716,471.548 0.00 0.00 84.00 9,404.05 9,338.00 8,594.26 -4,707.98 5,988,249.612 716,505.635 0.00 0.00 84.00 9,434.95 9,368.90 8,596.36 -4,688.03 5,988,252.298 716,525.519 0.00 0.00 84.00 9,483.05 9,417.00 8,599.62 -4,656.96 5,988,256.479 716,556.474 0.00 0.00 84.00 9,518.82 9,452.77 8,602.05 4,633.86 5,988,259.589 716,579.490 0.00 0.00 84.00 9,528.05 9,462.00 8,602.68 4,627.90 5,988,260.391 716,585.433 0.00 0.00 84.00 9,602.05 9,536.00 8,607.70 4,580.10 5,988,266.824 716,633.054 0.00 000 84.00 9,602.68 9,536.63 8,607.74 4,579.70 5,988,268.879 716,633.461 0.00 0.00 84.00 9,675.05 9,609.00 8,612.66 4,532.96 5,988,273.171 716,680.032 0.00 0.00 84.00 9,679.69 9,613.64 8,612.97 -4,529.96 5,988,273.574 716,683.018 0.00 0.00 11/12017 10:12:48AM Page 6 COMPASS 5000.1 Build 610 BP by BP Well Plan Survey Report BAF�UGHES E comp, Company: North America -ALASKA - BP Project: Niakuk Site: NK Main Pad Well: NK -08 Wellbore: Plan NK -08B Design: NK -08B WP03 Planned Survey TVD MD Inc (usft) (°) 15,692.25 33.00 7" (°) 15,700.00 33.00 15,706.56 33.00 TSGRD (usft) 15,726.82 33.00 Start Build 6.00 9,680.05 15,74241 33.94 TSGRC 5,988,273.605 15,786.50 36.58 Start Build 10.00 84.00 15,795.27 37.46 TSHU 4,525.53 15,800.00 37.93 15,889.85 46.92 TSAD 9,692.05 15,900.00 47.93 15,927.82 50.71 TZ3 0.00 15,997.99 57.73 TZ2C 9,642.99 16,000.00 57.93 16,100.00 67.93 16,200.00 77.93 16,300.00 87.93 16,320.69 90.00 Start DLS 10.00 TFO -14.65 16,400.00 97.67 16.500.00 107.33 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well NK -08 NK -08B Plan @ 66.05usft (P272 PLAN) NK -08B Plan @ 66.05usft (P272 PLAN) True Minimum Curvature EOM R5K - Alaska PROD - ANCP1 Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg TFace (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (°) 84.00 9,680.05 9,614,00 8,612.99 -4,529.73 5,988,273.605 716,683.250 0.00 0.00 84.00 9,686.55 9,620.50 8,613.44 4,525.53 5,988,274.170 716,687.433 0.00 0.00 84.00 9,692.05 9,626.00 8,613.81 -4,521.98 5,988,274.648 716,690-972 0.00 0.00 84.00 9,709.04 9,642.99 8,614.96 -4,511.00 5,988,276.126 716,701.908 0.00 0.00 84.00 9,722.05 9,656.00 8,615.86 -4,502.45 5,988,277.277 716,710.429 6.00 000 84.00 9,758.05 9,692.00 8,618.52 -4,477.14 5,988,280.684 716,735.649 6.00 0.00 84.00 9,765.05 9,699.00 8,619.07 -4,471.89 5,988,281.390 716,740.879 10.00 0.00 84.00 9,768.79 9,702.74 8,619.38 -4,469.02 5,988,281.777 716,743.745 10.00 0.00 84.00 9,835.05 9,769.00 8,625.70 4,408.80 5,988,289.883 716,803.748 10.00 0.00 84.00 9,841.92 9,775.87 8,626.49 -4,401.36 5,988,290.883 716,811.154 10.00 0.00 84.00 9,860.05 9,794.00 8,628.69 4,380.38 5,988,293.708 716,832.061 10.00 0.00 84.00 9,901.05 9,835.00 8,634.64 -4,323.80 5,988,301.324 716,888.439 10.00 0.00 84.00 9,902.12 9,836.07 8,634.82 4,322.11 5,988,301.551 716,890.123 10.00 0.00 84.00 9,947.57 9,881.52 8,644.11 -4,233.66 5,988,313.456 716,978.251 10.00 0.00 84.00 9,976.88 9,910.83 8,654.09 -4,138.71 5,988,326.237 717,072.861 10.00 0.00 84.00 9,989.18 9,923.13 8,664.45 -4,040.14 5,988,339.504 717,171.078 10.00 0.00 84.00 9,989.55 9,923.50 8,666.61 -4,019.57 5,988,342.274 717,191.581 10.00 0.00 81.98 9,984.25 9,918.20 8,676.26 -3,941.09 5,988,354.229 717,269.733 10.00 -1465 79.32 9,962.62 9,896.57 8,692.05 -3,844.88 5,988,372.860 717,365.437 10.00 -14.78 11/12017 10.12.48AM Page 7 COMPASS 5000.1 Build 81D BP by BP Well Plan Survey Report BA,ljII(UGHES a GEcompany Company: North Amenca- ALASKA -BP Project: Niakuk Site: NK Main Pad Well: NK -08 Wellbore: Plan NK -08B Design: NK -08B WP03 Planned Survey TVD MD Inc NIS (usR) (°) Northing 16,579.70 115.00 Start 150.00 hold at 16579.70 MD 16,600.00 115.00 16,700.00 115.00 16,729.70 115.00 Start DLS 7.00 TFO.158.97 16,762.81 112.83 Inverted TSADIBSHU 9,933.87 16,800.00 110.40 16,900.00 103.81 16,957.68 100.01 Inverted TSHUIBSGR 77.00 17,000.00 97.21 17,100.00 90.59 17,200.00 83.97 17,229.85 82.00 Start 250.00 hold at 17229.85 MD 17,300.00 82.00 17,400.00 82.00 17,479.85 82.00 Start Build 4.00 0.00 17,500.00 82.81 17,600.00 86.81 17,604.85 87.00 Start 400.00 hold at 17604.85 MD 17,700.00 87.00 17,800.00 87.00 17,900.00 87.00 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well NK -08 NK -08B Plan @ 66.05usft (P272 PLAN) NK -08B Plan @ 66.05usft (P272 PLAN) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Azl(azimuth) TVD TVDSS NIS EN9 Northing Easting OLeg TFace (°) (usft) (usft) (usR) (usR) (usft) (usft) (°1100usfq (°) 77.00 9,933.87 9,867.82 8,707.25 -3,772.18 5,988,390.198 717437.644 10.00 -15.36 77.00 9,925.29 9,859.24 8,711.39 -3,754.26 5,988,394.864 717,455.439 0.00 -13.32 77.00 9,883.03 9,816.98 8,731.77 -3,665.95 5,988,417.851 717,543.102 0.00 0.00 77.00 9,870.47 9,804.42 8,737.83 -3,639.72 5,988,424.679 717,569.139 0.00 0.00 76.10 9,857.05 9,791.00 8,744.87 -3,610.29 5,988,432.587 717,598.350 7.00 -158.97 75.12 9,843.35 9,777.30 8,753.47 -3,576.80 5,988,442.167 717,631.566 7.00 -159.33 72.62 9,813.95 9,747.90 8,780.04 -3,485.06 5,988,471437 717,722.482 7.00 -159.70 71.25 9,802.05 9,736.00 8,797.54 -3,431.41 5,988,490.514 717,775.582 7.00 -16043 70.26 9,795.72 9,729.67 8,811.33 -3,391.91 5,988,505.465 717,814.657 7.00 -160.71 67.97 9,788.92 9,722.87 8,846.87 .3,298.76 5,988,543.746 717,906.717 7.00 -160,86 65.69 9,793.66 9,727.61 8,886.14 .3,206.98 5,988,585.708 717,997.290 7.00 -161.02 65.00 9,797.30 9,731.25 8,898.50 -3,180.05 5,988,598.857 718,023.840 7.00 -160.91 65.00 9,807.06 9,741.01 8,927.86 -3,117.10 5,988,630.059 718,085.897 0.00 0.00 65.00 9,820.98 9,754.93 8,969.71 -3,027.35 5,988,674.542 718,174.366 0.00 0.00 65.00 9,832.09 9,768.04 9,003.13 -2,955.68 5,988,710.063 718,245.012 0.00 0.00 65.00 9,834.76 9,768.71 9,011.57 -2,937.58 5,988,719.033 718,262.852 4.00 0.00 65.00 9,643.81 9,777.76 9,053.65 -2,847.34 5,988,763.759 718,351.805 4.00 0.00 65.00 9,844.07 9,778.02 9,055.70 -2,842.95 5,988,765.936 718,356.136 4.00 0.00 65.00 9,849.05 9,763.00 9,095.85 -2,756.84 5,988,808.616 718,441.021 0.00 0.00 65.00 9,854.28 9,788.23 9,138.06 -2,666.33 5,968,853.474 718,530.237 0.00 000 65.00 9,859.52 9,793.47 9,180.26 -2,575.82 5,988,898.332 718,619.453 0.00 0.00 17/1@017 10:12:48AM Page 8 COMPASS 5000.1 Build BID BP by BP Well Plan Survey Report BAFUGHES 1G, ny Company: North Amenca- ALASKA -BF, Project: Niakuk Site: NK Main Pad Well: NK -08 Wellbore: Plan NK -08B Design: NK -08B WP03 Planned Survey MD Inc (usft) 1°) 18,000.00 87.00 18,00485 87.00 Start OLS 2.00 TFO 115.00 18,100.00 86.20 18,200.00 85.36 18,300.00 84.52 18,400.00 83.69 18,500.00 82.87 18,552.30 82.44 Start 765.00 hold at 18852.30 MD 18,600.00 82.44 18,700.00 82.44 18,800.00 82.44 18,900.00 82.44 19,000.00 82.44 19,100.00 82.44 19,200.00 82.44 1.9,300.00 82.44 19,317.30 82.44 Start DLS 4.00 TFO 180.00 19,400.00 79.13 19,500.00 75.13 19,600.00 71.13 19,637.01 69.65 Start 60.00 hold at 19637.01 MD 19,697.00 - 69.65 41/2" 718,981.735 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well NK -08 NK -08B Plan @ 66.05usft (P272 PLAN) NK -08B Plan @ 66.05usft (P272 PLAN) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) 65.00 9,864.75 9,798.70 9,222.46 -2,485.32 5,988,943.190 718,708.669 0.00 65.00 9,865.00 9,798.95 9,224.51 -2,480.92 5,988,945.368 718,713.000 0.00 66.73 9,870.65 9,804.60 9,263.35 -2,394.25 5,988,986.745 718,798.481 2.00 68.55 9,878.01 9,811.96 9,301.29 -2,302.03 5,989,027.393 718,889.540 2.00 70.37 9,886.83 9,820.78 9,336.24 -2,208.76 5,989,065.080 718,981.735 2.00 72.20 9,897.10 9,831.05 9,368.15 .2,114.55 5,989,099.760 719,074.955 2.00 74.04 9,908.80 9,842.75 9,396.98 .2,019.52 5,989,131.391 719,169.086 2.00 75.00 9,915.49 9,849.44 9,410.83 -1,969.53 5,989,146.708 719,218.644 2.00 75.00 9,921.76 9,855.71 9,423.07 -1,923.86 5,989,160.269 719,263.932 0.00 75.00 9,934.92 9,868.87 9,448.73 -1,828.10 5,989,188.764 719,358.881 0.00 75.00 9,948.07 9,882.02 9,474.38 -1,732.35 5,989,217.238 719,453.830 0.00 75.00 9,961.23 9,895.18 9,500.04 -1,636.60 5,989,245.712 719,548.779 0.00 75.00 9,974.38 9,908.33 9,525.70 -1,540.64 5,989,274.186 719,643.728 0.00 75.00 9,987.54 9,921.49 9,551.35 -1,445.09 5,969,302.660 719,738.677 0.00 75.00 10,000.69 9,934.64 9,577.01 -1,349.34 5,989,331.134 719,833.626 0.00 75.00 10,013.84 9,947.79 9,602.67 -1,253.58 5,989,359.608 719,928.575 0.00 75.00 10,016.12 9,950.07 9,607.11 .1,237.02 5,989,364.534 719,945.004 0.00 75.00 10,029.36 9,963.31 9,628.23 .1,158.18 5,989,387.978 720,023.180 4.00 75.00 10,051.62 9,985.57 9,653.46 -1,064.03 5,989,415.975 720,116.537 4.00 75.00 10,08083 10,014.58 9,678.22 -971.61 5,989,443.458 720,208.180 4.00 75.00 10,093.05 10,027.00 9,687.25 -937.94 5,989,453.471 720,241.571 4.00 75.00 10,113.91 10,047.86 9,701.80 -883.60 5,989,469.628 720,295.446 0.00 ]Pace 1°1 0.00 0.00 115.00 114.90 114.76 114.60 114.41 114.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 180.00 -180.00 -180.00 -180.00 0.00 111112017 10.12 4aAM Page 9 COMPASS 5000.1 Build 81O by Vertical Company: North America -ALASKA - BP Project: Niakuk Site: NK Main Pad Well: NK -08 Wellbore: Plan NK -08B Design: NK -08B WP03 Planned Survey MD Inc Azi (azimuth) (usft) 19,697.01 69.65 75.00 TD at 19697.01 Casing Points Measured Vertical Depth Depth lush) Juan) 10,000.00 6,183.93 95/8' 15,692.25 9,680.05 7" 19,697.00 10,113.91 4 1/2" BP BP Well Plan Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: TVD TVDSS NIS EM Northing usft) (usft) (usft) (usft) (usft) 10,113.91 10,047.86 9,701.81 -883.60 5,989,469630 Casing Hole Diameter Diameter Name (in) (in) 9.625 12.250 7.000 8.500 4.500 6.125 BA ER F� IGHES Egon, -,y Well NK -08 NK -0813 Plan @ 66.05usft (P272 PLAN) NK -08B Plan @ 66 05usft (P272 PLAN) True Minimum Curvature EDM RSK- Alaska PROD - ANCP1 Easting DLeg TFace (usft) ('1100usft) (1) 720,295.454 0.00 0.00 111112017 10:12:4HAM Page 10 COMPASS 5000.1 Build BID BP 0b BP Well Plan Survey Report BAT UGHES Emmp-, Company: North America - ALASKA - BP Local Co-ordinate Reference: Well NK -08 Project: Niakuk TVD Reference: NK -088 Plan @ 66.05usft (P272 PLAN) Site: NK Main Pad MD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Well: NK -08 North Reference: True Wellbore: Plan NK -08B Survey Calculation Method: Minimum Curvature Design: NK -08B WP03 Database: EDM RSK- Alaska PROD -ANCP1 Formations Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology 14,793.21 8,926.05 THRZ Sill 15,457.35 9,483.05 TJC 15,997.99 9,901.05 TZ2C 16,762.81 9,857.05 Inverted TSAD/BSHU 16,957.68 9,802.05 Inverted TSHU/BSGR 15,118.72 9,199.05 Kupamk 14,851.63 8,975.05 THRZ 15,706.56 9,692.05 TSGRD 14,576.87 8,744.05 CM1 (Tuffs) 15,511.01 9,528.05 TJS 14,344.53 8,546.05 CM2 (Tugs) 15,795.27 9,765.05 TSHU 15,599.24 9,602.05 TJA 15,742.41 9,722.05 TSGRC 15,363.16 9,404.05 Kingak(LCU/TJD) 15,927.82 9,860.05 TZ3 14,659.72 8,814.05 TLBK 11,975.51 7,067.05 OA 15,686.29 9,675.05 TSGR 15,889.85 9,835.05 TSAD 12,426.80 7,263.05 CM3 111112017 10:12:48AM Page 17 COMPASS 5000.7 Build 81O by BP Well Plan BP Survey Report BA1IT1t(UGHES 1.GEmmp ,n, Company: North America - ALASKA - BP Local Co-ordinate Reference: Well NK -08 Project: Niakuk TVD Reference: NK -0813 Plan @ 66.05usft (P272 PLAN) Site: NK Main Pad MD Reference: NK -08B Plan Q 66.05usft (P272 PLAN) Well: NK -08 North Reference: True Wellbore: Plan NK -08B Survey Calculation Method: Minimum Curvature Design: NK -0813 WP03 Database: EDM RSK- Alaska PROD -ANCP1 Plan Annotations Measured Vertical Local Coordinates Depth Depth -NI-S +El -W (usft) (usft) (usft) (usft) Comment 9,905.25 6,141.43 5,147.64 -4,729.93 TIP 10,000.00 6,183.93 5,210.31 4,786.88 KOP 10,016.00 6,191.08 5,221.10 4,796.29 Start 20.00 hold at 10016.00 MD 10,036.00 6,200.00 5,234.82 4,807.78 Start DLS 3.50 TFO 95.00 10,456.00 6,389.55 5,552.51 -5,004.20 Start 800.00 hold at 10456.00 MD 11,256.00 6,750.69 6,207.21 -5,288.71 Start DLS 3.50 TFO 88.39 11,626.20 6,915.34 6,524.69 -5,381.24 Start 1058.43 hold at 11626.20 MD 12,684.63 7,375.03 7,466.14 -5,531.70 Start DLS 3.50 TFO 144.70 14,691.82 8,841.02 8,556.04 -5,071.62 Start 1000.00 hold at 14691.82 MD 15,691.82 9,679.69 8,612.97 -4,529.96 Start 35.00 hold at 15691.82 MD 15,726.82 9,709.04 8,614.96 4,511.00 Start Build 6.00 15,786.50 9,758.05 8,618.52 -4,477.14 Start Build 10.00 16,320.69 9,989.55 8,666.61 -4,019.57 Start DLS 10.00 TFO -14.65 16,579.70 9,933.87 8,707.25 -3,772.18 Start 150.00 hold at 16579.70 MD 16,729.70 9,870.47 8,737.83 -3,639.72 Start DLS 7.00 TFO -158.97 17,229.85 9,797.30 6,898.50 -3,180.05 Start 250.00 hold at 17229.85 MD 17,479.85 9,832.09 9,003.13 -2,955.68 Start Build 4.00 17,604.85 9,844.07 9,055.70 -2,842.95 Start 400.00 hold at 17604.85 MD 18,004.85 9,865.00 9,224.51 -2,480.92 Start DLS 2.00 TFO 115.00 18,552.30 9,915.49 9,410.83 -1,969.53 Start 765.00 hold at 18552.30 MD 19,317.30 10,016.12 9,607.11 -1,237.02 Start DLS 4.00 TFO 180.00 19,637.01 10,093.05 9,687.25 -937.94 Start 60.00 hold at 19637.01 MD 19,697.01 10,113.91 9,701.81 -683.60 TO at 19697.01 11/1/2017 10.12:4aAM Page 12 COMPASS 5000.1 Build BID North America - ALASKA - BP Niakuk NK Main Pad NK -08 Plan NK -08B NK -08B WP03 Anticollision Summary Report 01 November, 2017 BA ER F�UGI ES a GE company BP 7y by Anticollision Report BAIUGHES GEmmpany Company: North Amenca- ALASKA -BP Project: Niakuk Reference Site: NK Main Pad Site Error: 0.00usft Reference Well: NK -08 Well Error: 0.00usft Reference Wellbore Plan NK -088 Reference Design: NK -08B WP03 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well NK -08 NK -08B Plan @ 66.05usft (P272 PLAN) NK -08B Plan @ 66.05usft (P272 PLAN) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference NK -0813 WP03 Filter type: NO GLOBAL FILTER: Using user defined selection 8 hhering criteria To Interpolation Method: MD Intenial 25.00usft Error Madel: ISCWSA Depth Range: 9,905.25 to 19,697.01usft Scan Method: Tray. Cylinder North Results Limtted by: Maximum center -center distance of 2,165.31 uaft Error Surface: Elliptical Conic Survey Tcol Program Date 9/7/2017 From To (usR) (usft) Survey (Wellbore) Tool Name Description 105.25 9,905.25 1 : Gyrodata gyrocompassing m/ (NK -08) GYD-GC-MS Gyrodata gyrocompassing m/s 9,905.25 10,400.00 NK -08B WP03 (Plan NK -0813) BLIND Blind drilling 10,400.00 15,692.00 NK -08B WP03 (Plan NK -08B) MWD MWD -Standard 10,400.00 15,692.00 NK -08B WP03 (Plan NK -08B) MWD+IFR+MS-WOCA MWD+FIR +Multi Station W/O Crustal 15,692.00 19,697.01 NK -0813 WP03 (Plan NK -08B) MWD MWD -Standard 15,692.00 19,697.01 NK -08B WP03 (Plan NK -08B) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 11/1/2017 9:10'17AM Page 2 of 4 COMPASS 5000.1 Build 81D by BP BAT(ER G Anticollision Report ( romp ny Company: North Amedca- ALASKA -BP Local Co-ordinate Reference: Well NK -08 Project: Niakuk TVD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Reference Site: NK Main Pad MD Reference: NK -08B Plan @ 66.05usft (P272 PLAN) Site Error: 0,00usft North Reference: True Reference Well: NK -08 Survey Calculation Method Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan NK -08B Database: EDM RSK- Alaska PROD -ANCP1 Reference Design: NK -088 WP03 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) NK 01 Island NK -01 - NK -01 - NK -01 12,211.27 7,350.00 456.70 249.22 213.81 Pass - Major Risk NK -01 -NK-01A-NK-01A 12,211.27 7,350,00 456.70 249.23 213.80 Pass -Major Risk NK -02 -NK -02 -NK -02 13,630.25 8,425.00 1,009.93 13.06 1,006.72 Pass - Minor 1/200 NK -02 -NK -02A -NK -02A 13,630.25 8,425.00 1,009.93 13.06 1,006.72 Pass - Minor 1/200 NK -02 - NK-02APB1 - NK-02APB1 13,630.25 8,425.00 1,009.93 13.22 1,006.56 Pass- Minor 1/200 NK Main Pad NK -07 -NK -07 -NK -07 9,923.45 10,000.00 1,018.35 327.89 693.99 Pass - Major Risk NK -07 -NK -07A -NK -07A 9,929.22 10,000.00 1,019.07 328.37 694.23 Pass -Major Risk NK -08 -NK -08 -NK -08 10,228.40 10,225.00 18.54 0.00 18.54 Pan -NOERRORS NK -08 -NK -08A -NK -08A 10,211.73 10,200.00 16.08 0.00 16.08 Pass-NOERRORS NK -09 -NK -09 -NK -09 12,839.89 13,875.00 631.40 538.87 168.30 Pass - Major Risk NK -10 -NK -10 -NK -10 9,926.43 9,925.00 975.39 334.76 703.38 Pass - Major Risk NK -11 -NK -11 -NK -11 12,788.15 13,200.00 1,231.96 400.63 929.97 Pass - Major Risk NK-11-NK-1IA-NK-11A 11,634.46 12,875.00 99.09 57.23 45.96 Pass - Minor 1/200 NK -11 - NK-11APB1 - NK-11APB1 11,634.46 12,875.00 99.09 57.23 45.96 Pass -Minor 1/200 NK -11 -NK -1I PBI -NK -11 PB1 12,788.15 13,200.00 1,231.96 400.52 930.08 Pass - Major Risk NK -11 -NK -11 PB2-NK-11 PB2 12,788.15 13,200.00 1,231.96 400.52 930.08 Pass - Major Risk NK -12 - NK -12 - NK -12 Out of range NK -12 -NK -12A -NK -12A 15,164.80 14,450.00 111.56 79.13 49.18 Pass - Minor 1/200 NK -12 -NK -12B -NK -12B 14,350.97 14,325.00 558.15 385.75 175.14 Pass - Major Risk NK -12 -NK -12C -NK -12C 14,350.97 14,325.00 558.15 385.28 175.60 Pass - Major Risk NK -13 -NK -13 -NK -13 13,226.24 13,675.00 1,159.59 398.47 822.83 Pass - Major Risk NK -14 -NK -14 -NK -14 14,199.25 13,775.00 1,893.48 407.11 1,500.06 Pass -Major Risk NK -14 -NK -14A -NK -14A 14,199.25 13,775.00 1,893.48 407.11 1,500.06 Pass - Major Risk NK-14-NK-14APB1-NK-14APB1 14,199.25 13,775.00 1,893.48 407.11 1,500.06 Pass - Major Risk NK -14 -NK -14B -NK -14B 14,140.65 13,500.00 1,960.67 388.81 1,577.29 Pass - Major Risk NK -15 - NK -15 - NK -15 Out of range NK -15 - NK -15A - NK -15A wp08A Out of range NK -17 - NK -17 - NK -17 Out of range NK -17 - NK-17PB1 - NK-17PB1 Out of range NK -17 - NK-17PB2 - NK-17PB2 Out of range NK -27 -NK -27 -NK -27 9,919.22 10,400.00 1,602.84 366.17 1,237.32 Pass - Major Risk NK -28 -NK -28 -NK -28 9,921.47 9,925.00 1,093.85 378.08 905.03 Pass - Major Risk NK -28 -Plan NK -28A -NK -28A WP07 Prelim 11,532.28 11,850.00 851.00 344.72 624.57 Pass - Major Risk NK -29 - NK -29 - NK -29 9,922.52 10,650.00 454.16 336.63 140.53 Pass- Major Risk NK -38 -NK -38B -NK -38B 18,794.03 17,050.00 2,148.93 346.98 1,820.70 Pass - Major Risk NK -61 - NK -61 - NK -61 Out of range NK-61-NK-6IA-NK-61A 16,930.25 15,025.00 636.17 208.90 466.43 Pass - Major Risk 11/12017 9:10:17AM Page 3 of 4 COMPASS 5000.1 Build 81D BP S� by Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Niakuk TVD Reference: Reference Site: NK Main Pad MD Reference: Site Error: O.00usft North Reference: Reference Well: NK -08 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore Plan NK -08B Database: Reference Design: NK -08B WP03 Offset TVD Reference: Well NK -08 NK -08B Plan @ 66.05usft (P272 PLAN) NK -08B Plan @ 66.05usft (P272 PLAN) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum BAKER JUGHES E-,, Reference Depths are relative to NK -08B Plan @ 66.05usft (P272 Coordinates are relative to: NK -08 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NA027' OGP-Usa AK 'entml Meridian is 150° 0' 0.000 W ° Grid Convergence at Surface is: 1.69° Ladder Plot 2200 f I - --- --L----- - I I I -�. I I I I I I C I I J 1650 I I 0 I I m im d I 1 I I En 1100 C I C i I m i I LD G I I d 550- U I I _______ ----------------- 1 ___ I I 0 3500 7000 10500 14000 17500 21000 NK -01, NK -01, NK -01 Vl -[- NK -13 wswp9PQeV lV(3500usftfin) -X- NK-29,NK-29,NK-29V38 NK -02, NK -02, NK -02 V2 NK -02, NK -02A, NK -02A VI NK -02, NK-02APB7, NK-02APB1 VO NK -07, NK -07, NK -07 V7 NK -07, NK -07A, NK-07AV5 NK-08, NK -08, NK -08 V1 NK -08, NK -08A, NK -08A V5 NK -09, NK -09, NK -09 V 1 NK -10, NK -10, NK -10 V4 NK-11,NK-11,NK-11 V5 -dr NK-12,NK-12C,NK-12CV12 -+- NK-13,NK-13,NK-13V9 $ NK-14,NK-14,NK-14V3 $ NK-14,NK-14A,NK-14AV1 -X- NK-14,NK-14APB1,NK-14APB1 V3 $ NK-14,NK-14B,NK-14BVO $ NK-15,NK-15,NK-15V20 -dr NK-15,NK-15A,NK-15AwpO8AV0 $ NK-16,NK-16,NK-16V2 $ NK-17,NK-17,NK-17VB -f- NK-3SNK-38A,NK-38AV12 -A- NK-38,NK38APB1,NK-38APB1 V7 $ NK -38, NK -38B, NK -38B VO -X- NK-61,NK61,NK-61 V12 $ NK61,NK61A,NK61AV6 -t• NK62,NK62,NK62V14 $ NK-62,NK62A,NK62AV3 $ NK62,NK62APB1,NK62APB1 V1 $ NK-65,NK65,NK65V21 $ NK65,NK65A,NK-65AV11 11/112017 9:10:17AM Page 4 of 4 COMPASS 5000.1 Build 81D Project: NlakukMr.ierm�IM7s Bite: NK Mein Pad Well: NK. Ma+we rMM OB suwMM. nalaen Wellbore: Plan NK41BH Oe M9M. 91.0 P Plan: NK -NR WP03 (NK-0&Plan NK -088) F.lotil a-bwi%i L_ 0 WELL DETAILS: NK -08 310mw Level: 19.10 .W -s +pw Northing Easnng Latitude LonOlWae slot O.0 0.00 5979798.00 721465.300 70-W 49S55N 1Q-IZ 7308W WELLBORE DETAILS: Plan NK -08B REFERENCE INFOIWATION Parent Wellbore: NK -08 Ceo48eM(N6) WMmw: We W a.TNe NOM Tie on MD: 990525 Val(NDI RM°rent°: WAS Pie 49 WA5WA(Nn PIANI Depth To Sun iPlan Saou Nal RaMre. SId. (0., 0 ME) 105.25 More] Men NeMmaos Wall Pan ®04.05Rn(R72 RANI 005.25 CMalin. MOM, Me.. cuM1uR 0 Slant 20.00 hold n 1001400 MD p KOP. Sian OLS 3.50 TF095-00 TLPStan 500.00 hold M 1056.00 MD 0 I/ yg Sten D433,50 TF088.N Stan 1058.43 hold a 11626.20 MD 0 95B". 58 § Sa]t INS 3.50 TF0144.70 8 OA CM3 ('NRS) i1j°. r; V93'tli BAF�UGHES NK-0 B Rt 5.3 fMK 9 hili '171 ".r . 51011000.00 InM M 14691.82 MD S. Budd 6.00 San DIS 10,N TPD -14.65 SIatt DLS 7A0 TPO-158.97 SAw - saint Haid Con Son Build ]ON - 1an DIS 2.0011 ?♦ L1116111.010 7'100 NK40131 T811.3 Sten DIS 4.00 TF0180011 N1( -08B Goa Poly WOW, 412" 3 NK Ter3.3. Nk.1,MB Tm" 088 Ter .000 8200 8,100 8600 8800 9000 9200 9400 9600 91N 100010200104001060010800 at 354.80° (200 ustUin) NK-OBIIVK-OBH WPo3 NK NA Rt 3.3 412" 1� Nk-08B Tie 4.3 -088 Gro Poly2 NK -088 Tgt 3.3 /� -- -� NK -08B Tgt 2.3 NkJ188 RI 2.3 1 NK -08B Tie 1.3 N111B 1 3 M, -MB Flt 6.3 4550 WNOTABONS NO Me AnnMebn 6141.49 990535 TIP "ON '00 )N KOP aim 0'001a00 SanawiddM101800110 8900.0 tOMW SWAM350TF095.00 MR510159.00 SomMMMtl a IM58.WW 67WO I'm 00 Satm3w TFOMW MISR I18M.M SmII0WO dWI18MA10 ]31503 12W 63 Sed M 3W0 O1N70 MFt@ 1469163 Sat IMWWd a 1401M Me MITI,W 150 , SMAumhw M1591RMD 97W W 15]2882 SWI9uk 3W 91501508.50 SbA Bub 190 93895516MO WtnLSID00VO UN 93]387 16519.0 SIan1W00 Atln M157eM M0 N041 167MR) Run DLS70070-ISR 13011999.0 $hA 250pOM9n1}9ASM0 MUM 11478.0 StlA9uk40) 9641.%17W4.5 Sal< MA M17MMMMD WON 1OWN SaIMS2110 011500 015a 162.0 5Bat M5601oNat IMRMM0 1W1 '10219317W 9a10.34NTF01RW 1093051963101 NMWA0hmmIM7.O1MO IM19At 1%9101 To Hit 0 SURVEY PROGRAM SECTION DETAILS Depth Fw Depth To Sun iPlan Tool 105.25 905.25 1: GpDdeta 9yteWmpeMMg.1 NK.NBYD-GC 4S 005.25 1000.00 NK -09B WP03(Plan NK -08B) BLIND 1000.00 15692.00 NK-0BB WPO3(Plan NK4,913) MWD 10400.00 15692.00 NK -08B WPO3(131O NK-0BB) Sac MD Into AN TVD -NIS .FJ -W D189 TFaca VSact Target 1 9905.25 63.22 317.65 6141.43 5147.64 4729.93 0.00 0.00 5555.43 2 10000.00 63AB 317.82 6183.93 6210.31 4786.88 0.32 30.34 5623.00 F CASINO DETAILS a 3 10016.00 63.50 320.05 6191.08 5221.10 4796.29 12.50 90.00 5634.61 TV0 MD M. � 4 10036.00 63.50 320.05 6200.00 5234.82 -080.78 0.00 0.00 5649.31 6163 sa 10Soa.oB 9.625 5 10458.00 63.16 336.51 6389.55 5552.51 5004.20 3.50 95.00 5983.50 9660.0 ts692.zs 2000 .M_. 6 11256.00 WAS 336.51 6750.69 6207.21 5288.71 0.00 0.00 6661.31 � lonael 19997.00 4.500 7 11828.20 8 12884.83 64.26 84.26 350.92 350.92 6975.34 7375.03 6524.69 -5381.24 7466.14 -5531.70 3.50 0.00 88.39 6985.88 0.00 7937.09 9 14691.82 33.00 84.00 8841.02 8556.04 5071.62 3.50 144.70 8980.77 O 10 15691.82 33.00 84.00 9679.69 861297 4529.96 0.00 0.00 8988.34 11 15726.82 33.00 84.00 9709.04 8614.96 4511.0D 0.00 0.00 8988.60 n 12 15786.50 36.58 14.00 9758.05 8618.52 4477.14 6.00 0.00 8989.08 13 16320.69 90.00 84.00 9989.55 8666.61 4019.57 10.00 0.D0 8995.47 0 14 16579.70 115.00T7.00 9933.87 8707.25 -3772.18 10.00 .14.55 9013.50 y 15 16729.70 115.00 77.00 9870.47 8737.83 5639.72 0.00 0.00 9137.94 16 17229.85 82.00 65.00 9797.30 8898.50 5180.05 7.00 166.97 9150.26 17 17479.85 82.00 65.00 9832.09 9003.13 2955.68 0.00 0.00 9234.10 18 17604.85 19 18004.85 87.00 87.00 65.00 65.00 9844.07 9865.00 9055.70 .2842.95 9224.51 .248D.92 4.00 ODD 0.D0 9276.23 0.00 9411.51 20 18552.30 82.44 75.00 9915.49 9410.83 1969.53 2.00 115.00 9550.68 21 19317.3D 82.44 75.00 10016.12 9607.11 1237.02 0.00 0.00 9679.71 2219637.01 69.65 75.00 70093.05 9687.25 -037.94 4.00 180.00 9732.39 2319697.01 69.65 TER 10113.91 9701.81 583.60 0.00 0.00 9741.96 0 Slant 20.00 hold n 1001400 MD p KOP. Sian OLS 3.50 TF095-00 TLPStan 500.00 hold M 1056.00 MD 0 I/ yg Sten D433,50 TF088.N Stan 1058.43 hold a 11626.20 MD 0 95B". 58 § Sa]t INS 3.50 TF0144.70 8 OA CM3 ('NRS) i1j°. r; V93'tli BAF�UGHES NK-0 B Rt 5.3 fMK 9 hili '171 ".r . 51011000.00 InM M 14691.82 MD S. Budd 6.00 San DIS 10,N TPD -14.65 SIatt DLS 7A0 TPO-158.97 SAw - saint Haid Con Son Build ]ON - 1an DIS 2.0011 ?♦ L1116111.010 7'100 NK40131 T811.3 Sten DIS 4.00 TF0180011 N1( -08B Goa Poly WOW, 412" 3 NK Ter3.3. Nk.1,MB Tm" 088 Ter .000 8200 8,100 8600 8800 9000 9200 9400 9600 91N 100010200104001060010800 at 354.80° (200 ustUin) NK-OBIIVK-OBH WPo3 NK NA Rt 3.3 412" 1� Nk-08B Tie 4.3 -088 Gro Poly2 NK -088 Tgt 3.3 /� -- -� NK -08B Tgt 2.3 NkJ188 RI 2.3 1 NK -08B Tie 1.3 N111B 1 3 M, -MB Flt 6.3 4550 WNOTABONS NO Me AnnMebn 6141.49 990535 TIP "ON '00 )N KOP aim 0'001a00 SanawiddM101800110 8900.0 tOMW SWAM350TF095.00 MR510159.00 SomMMMtl a IM58.WW 67WO I'm 00 Satm3w TFOMW MISR I18M.M SmII0WO dWI18MA10 ]31503 12W 63 Sed M 3W0 O1N70 MFt@ 1469163 Sat IMWWd a 1401M Me MITI,W 150 , SMAumhw M1591RMD 97W W 15]2882 SWI9uk 3W 91501508.50 SbA Bub 190 93895516MO WtnLSID00VO UN 93]387 16519.0 SIan1W00 Atln M157eM M0 N041 167MR) Run DLS70070-ISR 13011999.0 $hA 250pOM9n1}9ASM0 MUM 11478.0 StlA9uk40) 9641.%17W4.5 Sal< MA M17MMMMD WON 1OWN SaIMS2110 011500 015a 162.0 5Bat M5601oNat IMRMM0 1W1 '10219317W 9a10.34NTF01RW 1093051963101 NMWA0hmmIM7.O1MO IM19At 1%9101 To Hit 0 SURVEY PROGRAM Data: 2917-0BOIT0000:00 Valid6Nd: TO Vermin: Depth Fw Depth To Sun iPlan Tool 105.25 905.25 1: GpDdeta 9yteWmpeMMg.1 NK.NBYD-GC 4S 005.25 1000.00 NK -09B WP03(Plan NK -08B) BLIND 1000.00 15692.00 NK-0BB WPO3(Plan NK4,913) MWD 10400.00 15692.00 NK -08B WPO3(131O NK-0BB) NIWDBFR.MSWDCA 15892.00 19891.01 NK -08B WPO3(Man NK -0R) MWD 15692.00 19697.01 NK -08 WPM (Hon NK4W MWD.IFR.MS-WOCA bp Site: NK NIM 0 PWell: NK -08 Wel@ore: Plan NK-OBB Plan: NK -08B WPD3 (NK-OWPIan NK -06B) WELL DEfYL9: NI4N OleunO 114; 19.10 +W-5 +F4W Northing FU,,, LatmuEe LanOltude 0.00 0.00 597BR8500 nI4fi&390 ]0'2S'49.555N 148' IT i306 ANTFCOLLI811X4 SETTINGB ^�"'^' ^^"": N°16""nlw'"1M""-r 10, Mcdon M 0load: MD, inbrval: MOD MD DID Ali wo III -8 v -W Olp Deah Ren,le Flom: 8805.25 To 19897.01 mown 2Nfi.a: Nww o.r.. Re61N MmiNE By: Centre Distarce: 2185.31 av M+•: Ixn'b5 Retereme: Plan: NK-OBB WP03 (NK-0BRlan NK -OBS) Sum.,/PI. T.1 96wr Ns;ve: ar bw3 SIM Azimuth from North [y vs Centre to Centre Separation [25 usft/in] BA ER F�UGHFS a GE.,n,M, SURVEY PROG9IAM MD DID Ali wo III -8 v -W Olp TF. VBW Tu9M DaN:201)-0801 700'00:00 VeNMNB: Vee Vetsim: DePN F. DqM To Sum.,/PI. T.1 10.5,25 9905.25 I : G OMMG Ri MmP9s W W (NK -08) GYD-GCGM9 9905.25 I040D.00 NK-0BB WP03(P16 NK-0BB) BLIND 10400.00 15892.00 NK-O8B WP03 (Plan NK -0813) MWD 10400.00 15892.00 NK -086 WIM(PI. NK-0BB) MWD+IFR+M&WMA 15892.00 19097.01 NK -08B WP03 Ol. NK-0BB) MWD 1589200 19697.01 Ni WP03(Plan NK-0BB) MWD+IFR+M&W(= BA ER F�UGHFS a GE.,n,M, 0 40 35 i 30 300 / - 25 80' 20 15 10 270 N 8 I _ 013 9930 . i'. 1 90 .0130 / 10 !102213 15 1 20 240 10373 \_.. 25 120 \\ 30 \QB/\�+p0(ry1�g� 35 \\_ ` 40 210_ 45 150 50 180 Azimuth from North [y vs Centre to Centre Separation [8 usft/in] MD DID Ali wo III -8 v -W Olp TF. VBW Tu9M 993625 03.22 31785 6141.0 51+2.0 4MU ON O.q 66b6.13 =,o) W. 31].02 8183.. 5210.31 4280. "S 80.34 6823.03 Ig13.00 69.99 SAN 5191. 5x21.10 J].23 12.90 90.. 533!01 FrMl DMOIa TO MD IGM00 ... 3.Ob 52.03 5.4.54 4901R 1000.00 83.16338.51 M90 5552.51 5N4W Oq 3.. Oq 5.991 95.90 5003.. .xtnw,6,cWn4 11258. W10 Wo61u 09520]SI 32. 71 OM 0.90 MIDI 1152a 20 .26 350.92 8915& 621 so 335124 3.90 U.S. B.S.M 9905 10000 12554.53 90.25 3.02 ]3]503 ]1. .14 -661.70 18.102 Woo .W 53410x 3555.04 -67102 090 3 . 000 ].].W 1402 6.9.n 10000 -- 10400 isu IS .00 94.90 .1869 9512.. ay'9.. 15]28.82 31.00 .00 ... .M.. i611M 000 O.W oq 8950.34 090 6888.. 19400 12000 10].00 30.55 Mq 9]5905M1852 44]].14 I.20.8a 90.00 54.00 .8855 5599.81 A019.57 8.00 In. am 5.9.. GN 9.5 .6] 12000 13800 1.]9]0 11500 RW 9939.0] 3]0].26 4772.10 13]29.]0 11600 ]]q BS700 5]3].03 9599.]2 10.0 OM M.. 9013.. 000 9031.99 13899 15090 112x9.65 u. Wq 9A].30 .... -01... ]M AN B] 9190.. 15WD 19697 1]4]9.. 0290 Wq 9.209 900.9.13 2.5.. 1]64.65 67.90 ..q 9 A7 905530 4420 0.90 400 000 9234.10 000 men 19897 - -20197 1800135 9700 ..M 9.5M 922151 -24W. 13552.M 0244 ]$q BBISAB 410.63 196059 0. 2.00 000.11.61 11500 9.0.. 1.1]90 8244 ]6001M18.12 967.11 -t.1M OM 0,00 N79.71 1053101 W W ]561...05 956].259014 4.M I..M 322.. 1.9101 89.6 76 MIDI 13..1 9701 91 Mu 0W 000 9]41.. 0 40 35 i 30 300 / - 25 80' 20 15 10 270 N 8 I _ 013 9930 . i'. 1 90 .0130 / 10 !102213 15 1 20 240 10373 \_.. 25 120 \\ 30 \QB/\�+p0(ry1�g� 35 \\_ ` 40 210_ 45 150 50 180 Azimuth from North [y vs Centre to Centre Separation [8 usft/in] w ,u{a4w ytM lw.n.tun .xtnw,6,cWn4 .nun. w,melxc%0w �w;,;rtal.xulnt / 330 45 0 40 35 i 30 300 / - 25 80' 20 15 10 270 N 8 I _ 013 9930 . i'. 1 90 .0130 / 10 !102213 15 1 20 240 10373 \_.. 25 120 \\ 30 \QB/\�+p0(ry1�g� 35 \\_ ` 40 210_ 45 150 50 180 Azimuth from North [y vs Centre to Centre Separation [8 usft/in] 7 Y MINI � I I I � III lli I II Ili CHOKE L NE 3-1/8' SN F m WNUAL DATE VALVE 3-1/8' 5M RANGED KMRARC SATE VMY£ 3-1/8' 5M FLET( HOSE CELLAR AND WELL IEA CONFXRIRAIO, ARE FOR REFERENCE ONLY B ARE DEPENDENT ON OPERATOR'S REOAREMENIS MPPLE UP: SPACER SPOOL 13 5/6' 5m amm TOP 13 5/8' SM FLANGED BOTTOM SPACER SPOOL 'N 13 5/8' 5M FLANGE TOP 13 5/B' 5M FLANGED BOTTOM DWBIE STUDDED ADYPIER 13 5/B' 5M FUNDED TOP 11' 5M FLANGED BOTTOM CASINO SPOOL ASSEMBLY 11' SM FLANGED TOP 11' SM FLANGED BOTTOM (WIND HEN ASSENBLY 11" 5M FLANGED TOP 13-5/8' 5M SNWFER 1XT 13-5/e' SM STUDDED TOP 13-5/8' 5M FLANGED BOTTOM RAY TYPE W. 13 5/8' SM NOV 6012 DOUDLE BOP 13 5/9' SM mm TOP 13 5/8' SM FLANGED BOT10M W/ Y1/2' NANLLN LOCKS W/ 11' BOOSTER DRILLING CROSS: 13 5/8' SM STUDDED TOP 13 5/8' SM FLANGED 80TTd1 W (2) 3 1/W 5M SIDE WRETS KILL IDE: 2-1/18' 5M FLEX HOSE 2-1/1B' 5M X 3-1/8' 5M D.SA 3-1/W' 5M FANGED NANUA. DATE VALYL: 3-1/9' W FINCFD HYORAULC GTE VALVE RAN TYPE BOP: 13 5/8' W NOV 8012 SINGLE ROP 13 5/B' 5N MUM TOP 13 5/8' W FLANGED BOTTOM 6012 BOP STACK (DRAFT B. 3.17 L. C.) mONWOX BELL NIPFIE: C/L WELL 3Y Ol PUGS SEAL WELDED TO INE BOTTOM OF THE FLONROX TOP OF ROTARY TABLE 30-3/8' WNER DN LRWLE WFLATABLE RUBBER SEM WELL BELL NIPPLE .I I BOTiON OF ROTARY BEAM I r UPPER, 8' M LOWER 10U11Ef .. CASING FILL Ott OF 2) 13 5/8' SM BORON LRE MACE _ 16' KEWPER SFM-0-CRB' { 'l (1 FA)3' S81. OUBEE DW (1 FA) 2' DN. 510. OVIIEf DUTCH LOCK DOM! FLANGE 7 Y MINI � I I I � III lli I II Ili CHOKE L NE 3-1/8' SN F m WNUAL DATE VALVE 3-1/8' 5M RANGED KMRARC SATE VMY£ 3-1/8' 5M FLET( HOSE CELLAR AND WELL IEA CONFXRIRAIO, ARE FOR REFERENCE ONLY B ARE DEPENDENT ON OPERATOR'S REOAREMENIS MPPLE UP: SPACER SPOOL 13 5/6' 5m amm TOP 13 5/8' SM FLANGED BOTTOM SPACER SPOOL 'N 13 5/8' 5M FLANGE TOP 13 5/B' 5M FLANGED BOTTOM DWBIE STUDDED ADYPIER 13 5/B' 5M FUNDED TOP 11' 5M FLANGED BOTTOM CASINO SPOOL ASSEMBLY 11' SM FLANGED TOP 11' SM FLANGED BOTTOM (WIND HEN ASSENBLY 11" 5M FLANGED TOP 13-5/8' 5M SNWFER 1XT 13-5/e' SM STUDDED TOP 13-5/8' 5M FLANGED BOTTOM RAY TYPE W. 13 5/8' SM NOV 6012 DOUDLE BOP 13 5/9' SM mm TOP 13 5/8' SM FLANGED BOT10M W/ Y1/2' NANLLN LOCKS W/ 11' BOOSTER DRILLING CROSS: 13 5/8' SM STUDDED TOP 13 5/8' SM FLANGED 80TTd1 W (2) 3 1/W 5M SIDE WRETS KILL IDE: 2-1/18' 5M FLEX HOSE 2-1/1B' 5M X 3-1/8' 5M D.SA 3-1/W' 5M FANGED NANUA. DATE VALYL: 3-1/9' W FINCFD HYORAULC GTE VALVE RAN TYPE BOP: 13 5/8' W NOV 8012 SINGLE ROP 13 5/B' 5N MUM TOP 13 5/8' W FLANGED BOTTOM 6012 BOP STACK (DRAFT B. 3.17 L. C.) Rixse, Melvin G (DOA) From: Nocas, Noel <Noel.Nocas@bp.com> Sent: Wednesday, February 20, 2019 10:17 AM To: Rixse, Melvin G (DOA) Subject: RE: PTD 217-154, NK -08B Schematic Hi Mel, Thank you for reviewing the PTD for this well. Will you be at the AADE operators forum today? I hope these answers help, please don't hesitate to call or write if you need anything else: Setting the production packer: please reference step 44 on page 9 "Drop ball and rod and set production packer" — this is under the Run 4-1/2" Completion section. Production packer depth: I apologize for the confusion here, the schematic is not to scale. The production packer will be set approximately 150' above the 4.5" production liner top. Best, Noel Noel Nocas Drilling Engineer— BP Alaska noel.nocas@bp.com o. 907-564-5027 c. 907-229-9532 I - W W MV n p c 4T 1"d v' 1 O vxa:.n K "c�cr T�ya r A, From: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov> Sent: Wednesday, February 20, 2019 10:05 AM To: Nocas, Noel <Noel.Nocas@bp.com> Subject: PTD 217-154, NK -08B Schematic Noel, I do not see any place identifying where you plan to set the production packer. Your schematic shows it above the whipstock at -10,000 MD. Will it really be > 5,785' MD above the 7" shoe? Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-223-3605 Cell STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 333 West 7th Avenue Anchorage, Alaska 99501 Re: THE APPLICATION OF BP ) Conservation Order 570 r, u C x� �,t ti EXPLORATION (ALASKA) INC. ) P:, Vrrd��(, For an Order for Classification of a ) Prudhoe Bay Fielder New Oil Pool and to Prescribe Pool ) Prudhoe Bay Unit Rules for Development of the Raven ) Raven Oil Pool Oil Pool within the Prudhoe Bay Field ) August 9, 2006 Corrected January 28, 2019 IT APPEARING THAT: By letter dated February 8, 2006, BP Exploration (Alaska), Inc. (`BPXA"), operator of the Prudhoe Bay Unit ("PBU"), requested an order from the Alaska Oil and Gas Conservation Commission ("AOGCC") to define the Raven Oil Pool ("ROP") within the PBU, and to prescribe rales for governing the development and operation of the pool. Concurrently, BPXA requested authorization for enhanced recovery operations in the proposed ROP 2. The AOGCC published notice of opportunity for public hearing in the Anchorage Daily News on February 14, 2006. By e-mail correspondence dated February 13, 2006, the AOGCC requested additional information from BPXA in support of BPXA's application. 4. By correspondence dated March 3, 2006, and received by the AOGCC on March 6, 2006, Raymond C. Givens, attorney for the heirs of Andrew Oenga ("Oenga heirs"), notified the AOGCC that the Oenga heirs, as the owners of US BIA Allotment No. F-14632 and lessor of the land underlying the production facilities at Heald Point, requested the tentatively scheduled hearing be held March 30, 2006. 5. By correspondence dated March 9, 2006 and received by the AOGCC on March 13, 2006 the Inupiat Community of the Arctic Slope ("ICAS"), Federally Recognized Regional Tribal Government, objected to the Raven project until the lease dispute between BPXA and the Oenga heirs is settled. 6. By correspondence dated March 15, 2006, the AOGCC advised the ICAS that the hearing regarding BPXA's application would be held on March 30, 2006 at 9:00 am. 7. On March 24, 2006, BPXA submitted through e-mail correspondence the additional technical information requested by the AOGCC and requested a modification of the pool rules area. Conservation Order 570 (Corrected) January 28, 2019 Page 11 of 16 Affected Area: Umiat Meridian Township/Range Sections 12N -15E S/2SW/4 Section 24 E/2, NW/4, E/2SW/4 Section 25 E/2NE/4 Section 26 N/2NE/4 Section 36 12N -16E S/2NW/4, N/2SW/4, SWASWASection 29 All Section 30 NW/4NW/4 Section 31 Rule 1: Field and Pool Name The field is the Prudhoe Bay Field. Hydrocarbons underlying the affected area and within the herein defined interval of the Ivishak, Shublik and Sag River Formations constitute the ROP. Rule 2: Pool Definition The ROP is defined as the accumulation of hydrocarbons common to and correlating with the interval between log -measured depths 10,628 feet and 11,165 feet within Well NK -05. Rule 3: Well Spacing To allow for close proximity of wells in separate fault blocks, spacing within the pool will be a minimum of 20 acres. The ROP shall not be opened in any well closer than 500 feet to the external property lines where ownership or landownership changes. Rule 4: Casing and Cementing Practices In addition to the requirements of 20 AAC 25.030, the conductor casing must be set at least 75' TVD below the surface. In addition to the requirements of 20 AAC 25.030, the surface casing must be set at least 500' TVD below the base of the permafrost. Rule 5: Automatic Shut-in Equipment a. Upon completion each well shall be equipped with: 1. A fail-safe automatic surface safety valve (SSV) capable of preventing uncontrolled flow. 2. A fail-safe automatic surface controlled subsurface safety valve (SSSV), installed in the tubing string below the base of the permafrost and capable of preventing uncontrolled flow, unless other types of subsurface valve are approved by the AOGCC. b. A well that is not capable of unassisted flow of hydrocarbons, as determined by a "no flow" performance test witnessed by a AOGCC representative, is not required to have fail-safe automatic SSSV's. Davies, Stephen F (DOA) From: Roby, David S (DOA) Sent: Wednesday, January 23; 2019 2:27 PM To: Bredar, William L (William.Bredar@bp.com) Cc: Davies, Stephen F (DOA); Boyer, David L (DOA); Loepp, Victoria T (DOA) Subject: NK -08B well need for spacing exception Em After looking into whether or not a spacing exception for this well will be required the AOGCC has determined that we made an error when we adopted the spacing exception rule in CO 570. Namely despite BPXA asking for and us concluding a 500 -foot offset from property lines where ownership or landownership change was appropriate we adopted a rule, with no justification in the record, that was based on the pool boundaries and not based on ownership boundaries. We're going issue a corrected CO 570 to change the spacing exception rule to reflect that property lines where ownership changes, and not the pool boundaries, dictate when a spacing exception is required. Presuming the ownership and landownership on both sides of the pool boundary is the same, and that the other part of the spacing rule that requires a minimum of 20 -acre spacing is complied with, I believe this will eliminate the need for a spacing exception for this well. However, since part of the well will be completed outside of the pool boundary a GOR waiver might be necessary. We have no commissioners in the office this week, so it will likely be next week before we can get the corrected order out, but I've already gotten concurrence form the commissioners and our legal counsel to make this correction and wanted to let you know what we're going to do so you can plan accordingly in light of your desire to spud the well in March. Regards, David Roby Senior Reservoir Engineer Alaska Oil and Gas Conservation Commission 907-793-1232 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Dave Roby at 907- 793-1232 or dave.robv@alaska.sov. Davies, Stephen F (DOA) From: Davies, Stephen F (DOA) Sent: Tuesday, January 8, 2019 3:39 PM To: Lastufka, Joseph N (Joseph.Lastufka@bp.com) Subject: FW: CORRECTED: PBU NK -08B (PTD 217-154) - Spacing Exception Joe, Below is the email that I sent to BP in November 2017 regarding the need for a spacing exception for NK -08A. This nearly horizontal well, which targets the Sag River sands, will intersect the reservoir sands within the Raven Oil Pool, cross the external boundary of the pool, and then continue outside of the pool while remaining in the same sands. This violates the well spacing rule of Conservation Order 570, which states: To allow for close proximity of wells in separate fault blocks, spacing within the pool will be a minimum of 20 acres. The ROP shall not he opened in any well closer than 500 feet to the external boundary of the affected area. Accordingly, a spacing exception is needed. Please let me know if I can help you further. Regards, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviesPalaska.eov. From: Davies, Stephen F (DOA) Sent: Monday, November 6, 2017 5:43 PM To: Sperry, Nathan <Nathan.Sperry@bp.com> Cc: Lastufka, Joseph N (Joseph.Lastufka@bp.com) <Joseph.Lastufka@bp.com> Subject: CORRECTED: PBU NK -08B (PTD 217-1S4) - Spacing Exception This version corrects a cut-and-paste error in my first email. Please accept my apologies for the error. SD Nathan, Conservation Order 570 governs well spacing within the Raven Oil Pool. Rule 3 of CO 570 states: To allow for close proximity of wells in separate fault blocks, spacing within the pool will be a minimum of 20 acres. The ROP shall not he opened in any well closer than 500 feet to the external boundary of the affected area. [Underline emphasis is mine.] According to my map, the planned productive interval for proposed well NK -08B crosses the boundary of the Affected Area for the Raven Oil Pool near the bottom -hole location. The bottom -hole location lies in the SW1/4 SWI/4 Section 24, T12N, R15E, UM, which is outside of the Affected Area for the pool. If this is so, the well requires a spacing exception. Please submit an application for that spacing exception. The Permit to Drill for NK -08B will not be issued until the spacing exception is approved by the AOGCC. Regards, Steve Davies AOGCC CONFIDENTIALITY NOTICE., This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.¢ov. To allow for close proximity of wells in separate fault blocks, spacing within the pool will be a minimum of 20 acres. The ROP shall not he opened in any well closer than 500 feet to the external boundary of the affected area. From: Davies, Stephen F (DOA) Sent: Monday, November 6, 2017 5:34 PM To: 'Sperry, Nathan' <Nathan.Sperry@bp.com> Cc: Lastufka, Joseph N (Joseph. Lastufka@bp.com) <Joseph.Lastufka@bp.com> Subject: PBU NK -08B (PTD 217-154) - Spacing Exception Nathan, Conservation Order 570 governs well spacing within the Raven Oil Pool. Rule 3 of CO 570 states: Rule 3: Well Spacing - To allow for close proximity of wells in separate fault blocks, spacing within the pool will be a minimum of 20 acres. The ROP shall not be opened in any well closer than 500 feet to the external boundary of the affected area. As planned, well conforms with spacing requirements. [Underline emphasis is mine.] According to my map, the planned productive interval for proposed well NK -08B crosses the boundary of the Affected Area for the Raven Oil Pool near the bottom -hole location. The bottom -hole location lies in the SW1/4 SW1/4 Section 24, T12N, RISE, UM, which is outside of the Affected Area for the pool. If this is so, the well requires a spacing exception. Please submit an application for that spacing exception. The Permit to Drill for NK -086 will not be issued until the spacing exception is approved by the AOGCC. Regards, Steve Davies AOGCC CONFIDENTIALITY NOTICE., This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.zov. PBU NK -08B — Location Map NK,14B NK-0'8B (Proposed) NK -38A Raven Oil Pool NK -65A NK -15A NK -38B Q n NK -43 i; �A KEY 1 a Well Paths (Producer) Well Paths (Injector) Well Paths (P&A'd) Well Paths (Non -Pool) - ♦ Surface Casing Points 0 0.5 mi ♦ Intermediate Csg Points r Perforations AOGCC November 6, 201-, AOGCC Permit to Drill No. 217-154 6 November 2017 INPUT OUTPUT Geographic, NAD27 State Plane, NAD27 5004 -Alaska 4, U.S. Feet PBU NK -08A 1/1 Latitude: 70 20 49.555 Northing/Y: 5979798.563 Longitude: 148 12 07.308 Easting/J(: 721465.315 Convergence: 1 41 35.86721 Scale Factor: 0.999955716 Remark: Permit to Drill No. 217-154 - Coordinate Check Corpscon v6.0.1, U.S. Army Corps of Engineers Davies, Stephen F (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Wednesday, June 27, 2018 8:26 AM To: Davies, Stephen F (DOA) Subject: RE: NK -08B Permit to Drill Steve, Thank you for the reminder. The person I need to ask is currently on vacation so I'll check with them to confirm if the well is still planned for early 2019. Thanks again and please let me know if you need additional information. Thank you, Joe Lastufka SIM Specialist Cell: (907) 227-8496 1 Office: (907) 564-4091 --------------------------------------------------------------------------------------------------- --I us.«w,. Subsurface & Wells tnfo�aon Mncappment BP Exploration Alaska 1900 E. Benson Blvd. I Room: 778C I Anchorage, AK --------------------------------------------------------------------------------------------------- From: Davies, Stephen F (DOA) <steve.davies@alaska.gov> Sent: Wednesday, June 27, 2018 7:53 AM To: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Subject: RE: NK -08B Permit to Drill Joe, While working through my task list, I ran across BP's Permit to Drill application for NK -08A (PTD 217-154). The application has been on my task list since November 2017. Does BP still plan to drill this well, or would BP like to withdraw this application? As currently proposed, NK -08A will require a spacing exception. Thank you, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies(dalaska.gov. From: Lastufka, Joseph N [mailto:Joseph.Lastufka@bp.com) Sent: Monday, December 18, 2017 1:27 PM Davies, Stephen F (DOA) From: Davies, Stephen F (DOA) Sent: Wednesday, June 27, 2018 7:53 AM To: Tastufka, Joseph N' Subject: RE: NK -08B Permit to Drill Joe, While working through my task list, I ran across BP's Permit to Drill application for NK -08A (PTD 217-154). The application has been on my task list since November 2017. Does BP still plan to drill this well, or would BP like to withdraw this application? As currently proposed, NK -08A will require a spacing exception. Thank you, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviesPalaska.eov. From: Lastufka, Joseph N [mailto:Joseph.Lastufka@bp.com] Sent: Monday, December 18, 2017 1:27 PM To: Davies, Stephen F (DOA) <steve.davies@alaska.gov> Cc: Sperry, Nathan <Nathan.Sperry@bp.com>; Hecker, Dodie <Dodie.Stinson@bp.com> Subject: NK -08B Permit to Drill Steve, Just wanted to let you know that this well has been moved on the drilling schedule to late 2018 / early 2019. We will give you more information regarding the spacing exemption later in 2018. If you have any questions or need additional information, please don't hesitate to let me know. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 9V110 met M I BP Exploration Alaska1900 E. Benson Blvd.lRoom: 788DIAnchorage, AK Davies, Stephen F (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Monday, December 18, 2017 1:27 PM To: Davies, Stephen F (DOA) Cc: Sperry, Nathan; Hecker, Dodie Subject: NK -08B Permit to Drill Steve, Just wanted to let you know that this well has been moved on the drilling schedule to late 2018 / early 2019. We will give you more information regarding the spacing exemption later in 2018. If you have any questions or need additional information, please don't hesitate to let me know. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 W., BP Exploration Alaska1900 E. Benson Blvd.lRoom: 788DIAnchorage, AK c M c z LL 2 LL z O 2 09NDi0E 13N01nF 1ANn11F 11N019F 13Nn1AF iwn14F 13NMSF 11NMBF 9 NOM PwdMe Bay PA I Su..MM9 LIN Boundary Prudhoe Bay Unit 177 Aurora PA 01 � Rim PA N Flasks SeeSanl Boundary Borealis PA 1-7 C .Wra l Niakuk PA Gas Cay PA Orion PA Point McIntyre PA r�j PWeda PA North Slope Region O 1.25 2.5 5 ��; 'JMl•4 v w o"mw"'"am. ,gyp �•, r'l ❑seam. PA rr] Raven PA Miles �r�`"'� Minight Sun PA West Beach PA ""-' Map taatbn � w p 0 ,.: 12 8 9 30' 11 12 ] 8 •- 9 ]0 11 12 ] • – –Y 10 11 12 ) 8 1 9 10 11 32 ) 8 9 10 11 12 ] 8 I ! .9 10 17 16 35 11 . = 1 No�j r 1 14 14 13 !0� 3] 16 15 14 13 18 17 16 15 14 - 13 -J8. 11 36 X15 _-1461 is 17 Il6 15 14 13 10 17 .' 16 15 14 13 is 17 16 15 �16. 1,..1 13 1 _- 021 22 23 24 11 lal 21 22 23 24 19 20 21 22 23 24 19 20 21 22 tr., 34 19 20 22 23 24 19 20 21 Ii 23 24 19 20 21 22 23 2920 2) Milne - 1 Pru hoe - '-- T9' --�-� 26 26 POlnt 30 29 -2B 3] 26 2a 2] 26 25 30 29 26 25 - -- - 8 30 29 28 27 26 25 29 20 D Unit2z 1 '+ - _ 0 ' 25 33 34 35 36 31 32 33 134 35 ww 33 34 35 35 31 32 35 36 31 32 3 34 31 32 33 34 35 36 31 32 33 34 2 N7 35 35 3 1 2 1 6 5;–' 3 2 1 „' U1 31 2 1 6 BBeche 1 2 1 3 ,.,',..2 1 2 Niak u( PA 5 4 2 1 _. �� 1 1i�PointY31T�oinf 610 1 11 12 ] B 1 9 1e –13–'1: ) B 9 1 12 ) B unit 9 u1 12 McIntyre PA '\ 11 12t321 n pA_ 15 Aurora PA ____ Mid'night_ ew1i 10 11 12 L�l 016 13 15 14 13 1C 13 18 1) 116 Sun PA 1 Unit 15 14 1g 1 13 3 1 aDi 22 23 3 22 71L 19 20 23 1022 f1 23 22 23 21 2 24 23 l B21 26 256 -V2] 26 3B 2F 2] 26 3e .... 29 1B 2] – • 30 24 .. 20 :1 2] 26 25 1 k 2] Duck 25z6 30 29 2tl 2l 26 25 Na—.., Island 36334 35 36 31 132 43�631 2 333n 35 36Y 33 34 15 36 31 2 l3 34 35 36 31 32 33 34 35 •',n Unit 2 1 6 5 3 2 1 6 5 4 3 1 olaris PA 2 1 6 5 4 3 2 1 6 5 4 3 1 6 5 4 3 1 1 u 'Y 1- –�_ 10 11 12 ) 9 9 10 12 ] 10 7 9 11 12 1 B 9 19 11 12 ] 6 9 10 13 12 ] 8 9 ]0" 11 12 0 -_: 615 Ku a3Npk '.. 34 13 IVCI ll 16 35 14 18 1] 1 15 l 13 18 17 16 15 14 , 13 18 ]] 16 15 14 13 18 17 16 15 14 13 18 ll 16 - 39 1i nit ' k I 1 �� • 12 23 24 19 20 21 22 1 23 24 19 20 22 23 24 19 20 21 22 23 24 19 20 Lisburne PA 24 19 20 21 22 21 24 19 20 21 22 23 24 1 Gas 2' 22 23 8 22 26 25 30 i Orion PA 29 29 27 26 25 39 Cap PA 26 25 29 28 27 26 25 30 29 38 27 26 25 30 28 :5 29 27 25 28 2] 26 25 30 , 39 30 0' 3 1 - 28 32 34 35 36 31 1 33 34 l5 36 31 33 33 30 35 36 31 32 33 34 35 36 32 32 33' 34 35 36 33 32 33 34 35 36 31 32 33 34 35 36 3 2 1 6' S 4 3 2 1 6 5 0 ] 2 1 g 5 4 3 3 1 6 5 a 3 2- 1 6 5 4 3 2 1 6 5 4 3 2 1 1 011 30 11 12 ] ; 8 9 1B 11 12 ] 0 9 10 11 12 ) a 9 Rim PA 12 ] a 9 le 11 13 ] 8 9 10 11 12 ] 8 9 10 11 12 13 18 ll 16 15 14 13 18 1) 16 15 14 13 18 0 33 1] 36 IS 14 13 3B ll 16 15 ]4 13 1B 1) 16 15 30 33 30 3) 16 IS l4 13 i------ 49uu+arrrrrr�r 23 24 19 20 21 22 13 24 19 20 21 22 23 24 19 20 Z1 22 23 24 39 20 21 22 23 24 19 20 21 22 23 24 19 20 21 22 23 24 23 2] 26 "25 30 29 28 27 26 25 30 29 ZS 27 26 25 30 29 28 21 26 �5 777 28 2) 26 25 30 is 28 27 26 25 30 29 28 27 26 25 36 36 36 31 32 33 34 35 36 31 32 33 34 35 36 31 32 33 34 35 36 31 32 33 35 36 31 32 33 34 35 36 31 32 33 34 35 36 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 3 6 5 4 3 2 1 6 5 4 3 2 3 6 5 3 2 1 10 11 115 12 ] F 9 10 11 32 ) 8 9 10 11 12 ] 8 9 30 11 12 > a 9 10 31 12 > a 9 10 11 32 ) 1 P Ilt is 6 15 09NOitE 09N012E 09N013E O9N014E 09NOISE 4 W O 9 10 31 33 z 09N016E P.M. Bay Unit B..M.W NOM PwdMe Bay PA I Su..MM9 LIN Boundary Prudhoe Bay Unit 177 Aurora PA 01 � Rim PA N Flasks SeeSanl Boundary Borealis PA 1-7 C .Wra l Niakuk PA Gas Cay PA Orion PA Point McIntyre PA r�j PWeda PA North Slope Region O 1.25 2.5 5 ��; 'JMl•4 v w o"mw"'"am. ,gyp �•, r'l ❑seam. PA rr] Raven PA Miles �r�`"'� Minight Sun PA West Beach PA ""-' Map taatbn � w p TRANSMITTAL LETTER CHECKLIST WELL NAME: A� //V 6 / PTD: Z(7 — V Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: //GcyG POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. 'API No. 50- (If last two digits _ Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- _) from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. / Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Comoanv Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Comuany Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 Davies, Stephen F (DOA) From: Davies, Stephen F (DOA) Sent: Monday, November 6, 2017 5:43 PM To: 'Sperry, Nathan' Cc: Lastufka, Joseph N (Joseph.Lastufka@bp.com) Subject: CORRECTED: PBU NK -08B (PTD 217-154) - Spacing Exception This version corrects a cut-and-paste error in my first email. Please accept my apologies for the error. SO Nathan, Conservation Order 570 governs well spacing within the Raven Oil Pool. Rule 3 of CO 570 states: To allow for close proximity of wells in separate fault blocks, spacing within the pool will be a minimum of 20 acres. The ROP shall not he opened in any well closer than 500 feet to the external boundary of the affected area. [Underline emphasis is mine.] According to my map, the planned productive interval for proposed well NK -08B crosses the boundary of the Affected Area for the Raven Oil Pool near the bottom -hole location. The bottom -hole location lies in the SW1/4 SWI/4 Section 24, T12N, RISE, UM, which is outside of the Affected Area for the pool. If this is so, the well requires a spacing exception. Please submit an application for that spacing exception. The Permit to Drill for NK -08B will not be issued until the spacing exception is approved by the AOGCC. Regards, Steve Davies AOGCC CONFIDENTIALITY NOTICE., This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.¢ov. To allow for close proximity of wells in separate fault blocks, spacing within the pool will be a minimum of 20 acres. The ROP shall not he opened in any well closer than 500 feet to the external boundary of the affected area. From: Davies, Stephen F (DOA) Sent: Monday, November 6, 2017 5:34 PM To: 'Sperry, Nathan' <Nathan.Sperry@bp.com> Cc: Lastufka, Joseph N (Joseph.Lastufka@bp.com) <Joseph.Lastufka@bp.com> Subject: PBU NK -08B (PTD 217-154) - Spacing Exception Nathan, Conservation Order 570 governs well spacing within the Raven Oil Pool. Rule 3 of CO 570 states: Rule 3: Well Spacing - To allow for close proximity of wells in separate fault blocks, spacing within the pool will be a minimum of 20 acres. The ROP shall not be opened in any well closer than 500 feet to the external boundary of the affected area. As planned, well conforms with spacing requirements. [Underline emphasis is mine.] According to my map, the planned productive interval for proposed well NK -08B crosses the boundary of the Affected Area for the Raven Oil Pool near the bottom -hole location. The bottom -hole location lies in the SW1/4 SW1/4 Section 24, T12N, R15E, UM, which is outside of the Affected Area for the pool. If this is so, the well requires a spacing exception. Please submit an application for that spacing exception. The Permit to Drill for NK -08B will not be issued until the spacing exception is approved by the AOGCC. Regards, Steve Davies AOGCC CONFIDENTIALITY NOTICE., This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.Rov. p7 -p I / 5-4- V T- � 4vr� Loepp, Victoria T (DOA) From: Davies, Stephen F (DOA) Sent: Monday, December 18, 2017 1:28 PM To: Loepp, Victoria T (DOA); Schwartz, Guy L (DOA) Subject: FW: NK -08B Permit to Drill Follow Up Flag: Follow up Flag Status: Flagged FYI Steve D. CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. From: Lastufka, Joseph N [mailto:Joseph.Lastufka@bp.comj Sent: Monday, December 18, 2017 1:27 PM To: Davies, Stephen F (DOA) <steve.davies@alaska.gov> Cc: Sperry, Nathan <Nathan.Sperry@bp.com>; Hecker, Dodie <Dodie.Stinson@bp.com> Subject: NK -08B Permit to Drill Steve, Just wanted to let you know that this well has been moved on the drilling schedule to late 2018 / early 2019. We will give you more information regarding the spacing exemption later in 2018. If you have any questions or need additional information, please don't hesitate to let me know. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 wo mi r A BP Exploration Alaska]900 E. Benson Blvd.lRoom: 788DIAnchorage, AK Davies, Stephen F (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Monday, December 18, 2017 1:27 PM To: Davies, Stephen F (DOA) Cc: Sperry, Nathan; Hecker, Dodie Subject: NK -08B Permit to Drill Steve, Just wanted to let you know that this well has been moved on the drilling schedule to late 2018 / early 2019. We will give you more information regarding the spacing exemption later in 2018. If you have any questions or need additional information, please don't hesitate to let me know. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 VV BP Exploration Alaskal900 E. Benson Blvd.lRoom: 788DIAnchorage, AK Davies, Stephen F (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Monday, November 20, 2017 9:17 AM To: Davies, Stephen F (DOA) Cc: Hecker, Dodie; Sperry, Nathan Subject: RE: CORRECTED: PBU NK -08B (PTD 217-154) - Spacing Exception Steve, Thanks for the reminder, we are still discussing internally how to proceed and hope to have a resolution sometime next month. I appreciate your help. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 NIX BP Exploration Alaska1900 E. Benson Blvd.lRoom: 788DIAnchorage, AK From: Davies, Stephen F (DOA) [mailto:steve.davies@alaska.gov] Sent: Friday, November 17, 2017 2:23 PM To: Lastufka, Joseph N <Joseph.Lastufka @bp.com> Subject: RE: CORRECTED: PBU NK -08B (PTD 217-154) - Spacing Exception Joe, NK -08B requires a spacing exception. I haven't seen an application for that spacing exception. The Permit to Drill for NK - 08B will not be issued until the spacing exception is approved by the AOGCC. Any word on timing for the application? Thanks, Steve Davies AOGCC CONFIDENTIALITY NOTICE., This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.Rov. From: Davies, Stephen F (DOA) Sent: Wednesday, November 8, 2017 4:59 PM To:'Lastufka,Joseph N' <loseph.Lastufka@bp.com> Subject: RE: CORRECTED: PBU NK -08B (PTD 217-154) - Spacing Exception Joe, If the well is drilled and completed as planned, the approved spacing exception is valid for the life of that well so long as that well is not recompleted into a different pool (a pool not specified in the Conservation Order that grants the exception). If the spacing exception is approved and the corresponding Permit to Drill is cancelled or it expires (if not used within two years), the spacing exception becomes invalid. If the well is re -drilled to a new location, or is recompleted within a different pool that is not named in the Conservation Order, the spacing exception is no longer valid. Please let me know if you have additional questions. Thanks, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviesftalaska.eov. From: Lastufka, Joseph N (mailto•Joseph.Lastufka@bp.com] Sent: Tuesday, November 7, 2017 2:15 PM To: Davies, Stephen F (DOA) <steve.davies@alaska.eov>; Sperry, Nathan <Nathan.Sperry@bp.com> Subject: RE: CORRECTED: PBU NK -08B (PTD 217-154) - Spacing Exception Steve, If approved, how long is a spacing exemption valid? Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 ----------------------------------------------------------------------------------------- wo RVIA BP Exploration AlaskaJ900 E. Benson Blvd.lRoom: 788DIAnchorage, AK From: Davies, Stephen F (DOA)[mailto:steve.davies(@alaska.gov) Sent: Monday, November 6, 2017 5:43 PM To: Sperry, Nathan <Nathan.Sperry@bp.com> Cc: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Subject: CORRECTED: PBU NK -08B (PTD 217-154) - Spacing Exception This version corrects a cut-and-paste error in my first email. Please accept my apologies for the error. SD Nathan, Conservation Order 570 governs well spacing within the Raven Oil Pool. Rule 3 of CO 570 states: To allow for close proximity of wells in separate fault blocks, spacing within the pool will be a minimum of 20 acres. The ROP shall not he opened in any well closer than 500 feet to the external boundary of the affected area. [Underline emphasis is mine.] According to my map, the planned productive interval for proposed well NK -08B crosses the boundary of the Affected Area for the Raven Oil Pool near the bottom -hole location. The bottom -hole location lies in the SW1/4 SW1/4 Section 24, T12N, R15E, UM, which is outside of the Affected Area for the pool. If this is so, the well requires a spacing exception. Please submit an application for that spacing exception. The Permit to Drill for NK -08B will not be issued until the spacing exception is approved by the AOGCC. Regards, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviesCa)alaska.eov. To allow for close proximity of wells in separate fault blocks, spacing within the pool will be a minimum of 20 acres. The ROP shall not he opened in any well closer than 500 feet to the external boundary of the affected area. From: Davies, Stephen F (DOA) Sent: Monday, November 6, 2017 5:34 PM To: 'Sperry, Nathan' <Nathan.Sperry@bp.com> Cc: Lastufka, Joseph N (Joseph.Lastufka@bp.com) <loseph.Lastufka@bp.com> Subject: PBU NK -08B (PTD 217-154) - Spacing Exception Nathan, Conservation Order 570 governs well spacing within the Raven Oil Pool. Rule 3 of CO 570 states: Rule 3: Well Spacing - To allow for close proximity of wells in separate fault blocks, spacing within the pool will be a minimum of 20 acres. The ROP shall not be opened in any well closer than 500 feet to the external boundary of the affected area. As planned, well conforms with spacing requirements. [Underline emphasis is mine.] According to my map, the planned productive interval for proposed well NK -08B crosses the boundary of the Affected Area for the Raven Oil Pool near the bottom -hole location. The bottom -hole location lies in the SWI/4 SWI/4 Section 24, T12N, RISE, UM, which is outside of the Affected Area for the pool. If this is so, the well requires a spacing exception. Please submit an application for that spacing exception. The Permit to Drill for NK -08B will not be issued until the spacing exception is approved by the AOGCC. Regards, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.¢ov. TRANSMITTAL LETTER CHECKLIST WELL NAME: eQ (z PTD: 217—�s7 /Development _ Service Exploratory _ Stratigraph c Test _ Non -Conventional FIELD:POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50 - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, RAVEN OIL- 640147 ----------- PTD#:2171540 Company BP EXPLORATION_(ALAS_KA) INC._ Initial Classrrype _ Well Name: PRUDHOE BAY UN NIA NK -08B Program DEV Well bore seg ❑ DEV/PEND _ GeoArea 890 Unit 11F50 On/Off Shore Off Annular Disposal ❑ Administration 1 Permit fee attached. - - - - - - NA 2 Lease number appropriate... - - - - - - Yes Surf Loc & Top Prod Int lie in ADL0034625; TO lies. in ADL0034630... . . . . . . . . . ...... ... . 3 Unique well name and number - - - Yes 4 Well located in a. defined pool... _ - - Yes . PRUDHOE BAY, RAVEN OIL- 640147, governed by CO 570, Corrected .l/28/2019 .. . ............. . . . 5 Well located proper distance from drilling unit.boundary.. Yes - - - - Well conforms with. Rule 3, Well Spacing, of CO 570 as ownership -and landownership - - - - - - - - - - - - - - - 6 Well located proper distance from other wells- Yes is the same for affected leases ADL 0034625 and ADL0034630. No exception needed.- 7 Sufficient acreage available in drilling unit.... - - - - - - - Yes 8 If deviated, is. wellbore platincluded- - - - Yes - - - - 9 Operator only affected party---- - - - - - - - - - - - - - - - - Yes 10 Operator has appropriate bond in force - - - - - - - - - - - - Yes - - - - - - .. . ............... . 11 Permit can be issued without conservation order.. - - - - - - - No Appr Date 12 Permit can be issued without administrativeapproval- ... ..... - - - NA...- 13 Can permit be approved before 15 -day. wait- NA. SFD 2/14/2019 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 14 Well located within area andstrataauthorized by Injection Order# (put. 10# in. comments) (For, NA.. , .... --- ----------- 15 All wells. within 1/4. mile. area. of review identified (For service well only)... - - - - - NA . . . . . . . . . . . ................. - 16 Pre -produced injector; duration of preproduction less than 3 months. (for service well only) - NA - - - - .... - - . . . . .. .......... 17 Nonconven, gas conforms to AS31 05.03QQ.1 A),Q,2,A-D) _ - _ - - .. NA. 18 Conductor string.provided .... - - - - - - - - NA- ... Conductor set-in PBU NK -08- - - - - - - - - - - --- --- - Engineering 19 Surface casingprotectsall known USDWs - - - - - NA. - - - . Surface casing set in PBU NK -08 . - - . ...... ..... 20 CMT vol adequate. to circulateonconductor& surf.csg - - - - - - - - - - ------- NA - - - - - Surface casing set and fully. cemented - - - - - - - - - - - ... 21 CMT vol adequate to tie-inlong string to surf cs9_ - - _ - _ - .... - - - NA ...........- '22 CMT will coverall knownproductivehorizons................. . . . . . . . . Yes - - - - Productive_ interval will be completed with. cemented production. liner and perforated- - 23 Casing designs adequate for C,.T. B &-permafrost- - - - - - - - - - .. _ _ - ... _ Yes - - - - 24 Adequate tankage. or reserve pit --- - - - - - - - - - - - - - ..... - - - - - _ Yes - .. Rig has steel tanks; all waste -to approved disposal wells. - - - 25 If a re -drill, has_a 10-403 for abandonment been approved - - - - - - - - - - - - - - - - -- Yes - - _ - - PTD 201-029,.$undry 317-516..... 26 Adequate wellbore separation. proposed- - - - - _ - - - - - . . .... . .... ... . . Yes - - - Anti-coUision analysis complete; Major risk failures: NK-02.P&A'd; NK -11A T&A'd;.NK-12A-P&A'd 27 If diverter required, does it meet regulations ....... - - - - _ - _ - - _ .. NA Appr Date 28 Drilling fluid. program schematic & equip list adequate- - - - - - - Yes - - - - - - Max formation pressure is 4502 psig(8 95 ppg EMW); will drill. w/ 9,2711.5-ppg EMW - - - - - - - - - MGR 2/20/2019 129 BOPEs,.do they meet regulation Yes - '30 BOPE.press rating appropriate; test to.(put psig in comments).. - - - - - - - - - - Yes - - - - - MPSP is 3535 psig; will test BOPS. to 4000-psig - - - - - - - - - - ----- - - - - - - - 31 Choke manifold complies w/API. RP -53 (May 84)- - - - - - ...... - - Yes ------- 32 Work will occur without operation shutdown- - .... _ - - - - - - - - Yes - 33 Is presence of H2S gas probable - - - - - _ - - - - - - _ _ _ Yes ...... H2$ measures required 34 Mechanical condition of wells within AOR verified (For service well only) .... - _ NA . . ........ . . . . . . . . . . . . . . . . . . .............. . . . . . . . . . . . . . .. . 35 Permit can be issued w/o hydrogensulfide measures . . . . . . . . .......... No.. - - - - - NK -Pad is an H2S Pad. H2S measures -are required.. - - ............. - Geology 36 Datapresentedon potential overpressure zones - - - - - - - - - - - - - ---- - - - - - - Yes - ... Planned mud weights appear adequate to control the. operator's forecast of most likely pore pressures Appr Date 37 Seismic. analysis of shallow gas zones- - - - - - -- - --- - ----- - - - - - - - - - - NA... - - _ . provided in the operator's geologic prognosis.... - - - SFD 2/13/2019 38 Seabed condition survey - if off -shore) . . . . . ......... Y (- - - - � - � NA............ - _ - _ - _ _ - . - - - _ _ _ _ ... - - _ _ - .......... . - � - - - - - - - - - - - 39 Contact name/phone for weekly. progress reports. [exploratory only,] - - - ...... .. _ NA - - - - - - - - - Geologic Date: Engineering Date Public Date Commissioner: Commissioner: Commissioner 7 ��2� /7