Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout217-176MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Thursday, August 18, 2022
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Austin McLeod
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
03-10A
PRUDHOE BAY UNIT 03-10A
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 08/18/2022
03-10A
50-029-20361-01-00
217-176-0
G
SPT
8034
2171760 2008
2937 2940 2941 2937
9 9 9 9
4YRTST P
Austin McLeod
7/18/2022
MITIA
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UNIT 03-10A
Inspection Date:
Tubing
OA
Packer Depth
106 2303 2262 2250IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitSAM220718183130
BBL Pumped:4.2 BBL Returned:4.2
Thursday, August 18, 2022 Page 1 of 1
9
9
9
9
9
9
9
9
9
9
James B. Regg Digitally signed by James B. Regg
Date: 2022.08.18 15:19:51 -08'00'
Operator Name:2.
Development Exploratory
Service
5
Permit to Drill Number:217-176
6.50-029-20361-01-00
PRUDHOE BAY, PRUDHOE OIL
Hilcorp North Slope, LLC 5.
Well Name and Number:8.
10.Field/Pools:
Well Class Before Work4.
Present Well Condition Summary:11.
Total Depth: measured feet
feet
Plugs measured feet
feet
Effective Depth: measured feet
feet
Packer measured feet
feettrue vertical true vertical
10422
10386
8657
8399 , 8567
none
none
7667 , 8034
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20" 37 - 117 37 - 117 1530 520
Surface 2701 13-3/8" 36 - 2737 36 - 2737 5380 2670
Intermediate 9033 9-5/8" 34 - 9067 34 - 8533 6870 / 8150 4760 / 5080
Liner 535 7" 8745 - 9280 8212 - 8746 8160 7020
Perforation Depth: Measured depth: 9535 - 10382
feet
True vertical depth:8965 - 8659 feet
Tubing (size, grade, measured and true vertical depth)5-1/2" 17# x 4-12" 12.6# L-80 32 - 8854 32 - 8321
8399 , 8567 7867 , 8034Packers and SSSV (type, measured and
true vertical depth)
5-1/2" Baker S-3 , 5-1/2" Otis RH
Liner 1982 3-1/2" x 3-1/4" x 2- 8440 - 10422 7908 - 8637
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
149110085360
114620 73
0
0 1331
Representative Daily Average Production or Injection Data
Prior to well operation:
Subsequent to operation:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name:
Contact Email:
Torin Roschinger
Torin.Roschinger@hilcorp.com
Authorized Name:Bo York
Authorized Title:
Authorized Signature with Date:Contact Phone:(907) 564-4887
Treatment descriptions including volumes used and final pressure:
13.
Operations Manager
Operations Performed1.
Abandon Plug Perforations Fracture Stimulate Pull Tubing
GSTOR WINJ WAG 5 GINJ SUSP SPLUG
16. Well Status after work:Oil Gas
Exploratory Development Stratigraphic
15. Well Class after work:
5Service
WDSPL
14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283)
Daily Report of Well Operations
Copies of Logs and Surveys Run
true vertical measured8637
Sundry Number or N/A if C.O. Exempt:
n/a
no SSSV
Junk
Packer
Printed and Electronic Fracture Stimulation Data
5
Operations shutdown
Change Approved Program
Senior Pet Engineer:Senior Res. Engineer:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Suspend 5Perforate Other Stimulate Alter Casing
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well
3.Address: 3800 Centerpoint Dr, Suite
1400, Anchorage, AK 99503
7.Property Designation (Lease Number):ADL 028327 PBU 03-10A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
Stratigraphic
Other:
API Number:
Form 10-404 Revised 03/2020 Submit Within 30 days of Operations
By Samantha Carlisle at 10:09 am, Jan 28, 2021
Digitally signed by Bo York
DN: cn=Bo York, c=US, o=HIlcorp
Alaska LLC, ou=Alaska North
Slope, email=byork@hilcorp.com
Date: 2021.01.28 07:35:34 -09'00'
Bo York
MGR18FEB2021 RBDMS HEW 1/29/2021 SFD 1/28/2021DSR-1/28/21
ACTIVITYDATE SUMMARY
1/9/2021
T/I/O=0/0/0 Assist E-Line (Add Perfs) Pump 5 bbls 60/40, 90 bbls 1% kcl w/safelube
to assist e-line down hole with guns. Pump 2 bbls neat & 3 bbls 60/40 to freeze
protect surface equipment while e-line POOH. Pump 3 bbls 60/40 as e-line neared
surface. Pump 2 bbls 60/40 & 58 bbls 1% kcl w/safelube to assist e-line down hole
with guns. Pump 2 bbls neat & 58 bbls crude to freeze protect for the night. (Job to
continue tomorrow morning) FWHPs=800/0/0
1/9/2021
***WELL S/I ON ARRIVAL*** (HES E-Line Perforating)
PERFORATE 9760' - 9775' W/ 2", 6 SPF, 60 DEG PHASE, MAXFORCE GUN.
PERFORATE 9699' - 9730' W/ 2", 6 SPF, 60 DEG PHASE, MAXFORCE GUN.
LRS ASSISTED PUMP DOWN AT 2 BPM.
***JOB CONTINUED ON 10-JAN-2021***
1/10/2021
***JOB CONTINUED FROM 09-JAN-2021*** (HES E-Line Perforating)
PERFORATE 9670' - 9701' W/ 2", 6 SPF, 60 DEG PHASE, MAXFORCE GUN.
PERFORATE 9535' - 9566' W/ 2", 6 SPF, 60 DEG PHASE, MAXFORCE GUN.
ALL LOGS CORRELATED TO SLB CBL LOG DATED 08-MAY-2018.
LRS ASSISTED PUMP DOWN AT 2 BPM.
***JOB COMPLETE ON 10-JAN-2021***
1/10/2021
Assist ELine (PERFORATING) Pumped 5 bbls 60/40 meth, 138 bbls 120* 1% KCL
w/ safelube and 60 bbls crude down Tbg to assist ELine. ELine in control of well per
LRS departure. IA,OA=OTG
Daily Report of Well Operations
PBU 03-10A
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
nr-ULIVED
IAN no
1. Operations Performed
Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations ;gli _ ❑
El ❑ Perforate Other Stimulate 0 Alter Casing 11 Change Apfip.•rr►►IBf (t/�
�
Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Mud Acid, HPBD m
2. Operator Name: BP Exploration (Alaska), Inc
4. Well Class Before Work
Development ❑ Exploratory ❑
5. Permit to Drill Number 217-176
3, Address: P.O. Box 196612 Anchorage,
AK 99519-6612
Stratigraphic ❑ Service 21
1 6. API Number: 50-029-20361-01-00
7. Property Designation (Lease Number): ADL 028327
S. Well Name and Number: PBU 03.10A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pools.
PRUDHOE BAY, PRUDHOE OIL
11, Present Well Condition Summary:
Total Depth: measured 10422 feet Plugs measured None feet
true vertical 8637 feet Junk measured None feet
Effective Depth: measured 10386 feet Packer measured 8399, 8567 feet
true vertical 8657 feet Packer true vertical 7667, 8034 feet
Casing: Length. Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20" 37-117 37-117 1530 520
Surface 2701 13-3/8" 36-2737 36-2737 4930 2670
Intermediate 9033 9-5/8" 34-9067 34-8533 6870/8150 4760 / 5080
Liner 535 7" 8745-9280 8212-8746 8160 7020
Liner 1982 3-1/2" x 3-1/4" x 2-7/8" 8440-10422 7908-8637
Perforation Depth. Measured depth. 10231 - 10382 feet
True vertical depth'. 8743-8659 feet
Tubing (size, grade, measured and true vertical depth) 5-1/2" 17# x 4-1/2" 12.6#, L-80 32-8854 32-8321
5-1/2" Baker S-3 Packer 8399 7867
Packers and SSSV (type, measured and 5-112" Otis RH Packer 8567 8034
true vertical depth) 5-1/2" MCX SSSV 1994 1994
12. Stimulation or cement squeeze summary: Park above TOL Perform Injectivi fy Test with Diesel. At Bag, circulate NH4CI and first HCL stage. Close choke &
pump Acid Stim per program reciprocating across parts. Pull above TOL and perform Injectivity test. Over flush with 426 bbls of NH4CL. Tubing left with a column of
diesel. Pooh.
Intervals treated (measured): 10231 - 10382
Treatment desonptions including volumes used and final pressure: 456 bbls of 3% NH4CI +F103, 46 bbls of 12% HCI, 46 bbls of 9:1 Mud Acid, 5 bbls of OilSeeker,
55 bbls of Diesel.
Final Pressures: OA = 0 psi, IA = 0 PSI, TBG = 0 psi
13. Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mct
Water -Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
0
1398
0
0
0
Subsequent to operation:
0
12635
0
0
0
14. Attachments: (required par20 MC 25.070,25.07, a 25.283)
15. Well Class after work:
Daily Report of Well Operations 21
Exploratory ❑ Development ❑ Service 71 Stretigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑
IGSTOR ❑ WINJ ❑ WAG 0 GINJ ❑ SUSP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
318-329
Authorized Name: Shriver, Tyson Contact Name: Shiiver, Tyson
Authorized Tide: Well Intervention Engineer Contact Email: Tyson.Shnver0Mbp.com
Authorized Signature:
Date: / Contact Phone: +1 9075644133
Form 10.404 Revised 04/2017 At&SLZQK0`1/ RBDMS %A 16 N A n 2019
��/ Y Submit Original Only
Daily Report of Well Operations
PBU 03-10A
ACTIVITYr1ATF RI IMMARY
CTU#8 1.75" CT Job Scope: Acid Stim / Cont Perf
MIRU CTU. Standby for Sib pump crew.
12/13/2018
***Continue Job on 12/14/18 WSR***
CTU#8 1.75" CT Job Scope: Acid Stim / Cont Perf
MU & RIH w/ 2.0" JSN. Tag PBTD at 10393' down / 10389' up. Flag pipe at 10385'. Slowly puh &
circulate warm 1 % KCL w/ Safelube. Pull heavy at 10230' and become detained. Circulate btms up
with safelube. Work pipe to get free. Pooh and inspect injector. Gripper blocks and chains packed
with a thick tar substance. Swap out gripper blocks with new from the sib shop, wipe down/inspect
chains & change packoffs.
12/14/2018
***Continue on 12/15/18***
CTU#8 1.75" CT. Job Scope: Acid Stim / Cont Perf
MU & Rih w/ Slim BHA w/ 1.75" JSN. Jet Hot Diesel while RIH. Jet down to flag -5' off TD.
Reciprocate across perfs jetting diesel. Circulate btms up with diesel. Park above TOL Perform
Injectivity Test with Diesel. Pump 0.5bpm until Whp reached 1900psi then shut down. Whp slowly
bleeds down, unable to continuously pump. Release LRS & rig up Sib Pumpers. At flag, circulate
NH4CI and first HCL stage. Close choke & pump Acid Stim per program reciprocating across perfs.
Pull above TOL and perform Injectivity test w/ NH4CL for 10 mins each: 0.5 bpm @ 820 psi, 1 bpm
@ 1358 psi, 1.5 bpm @ 1536 psi, 1.8 bpm @ 1657 psi. Over flush with 426 bbls of NH4CL. Tubing
left with a column of diesel. Pooh.
12/15/2018
***Continued on 12/16/18***
CTU#8 1.75" CT Job Scope: Acid Stim / Cont Perf
Pooh. LD tools. Change packoffs. RDMOL
12/16/2018
**Job Com lete**
***WELL SA ON ARRIVAL SWCP 4518***(acid)
DRIFT W/ 5-1/2" BRUSH & 4.50" G -RING TO X -NIP @ 1981' SLM(1994' MD).
SET 5-1/2" MCX(ser#=BP-10, 1" bean) @ 1981' SLM(1994' MD).
RAN 5-1/2" CHECK SET TO MCX @ 1981' SLM(1994' MD) GOOD SET.
12/18/2018
—WELL LEFT S/I ON DEPARTURE***
IWE-LHEAD=
FMC
ACTUATOR=
CWSHBOOSTER
Off. ELEV =
64'
REF ELEV =
B4'
BF. ELEV =
-- 27.77-
KOP=
4100'
Mm Angie =
126° @ 9906
Datum MD=
9401'
Datum TVD=
8800'SS
9-5/8'CSG,1390
L-80 HYD563,
9-5/8" BOWER 1390'
EXT CSG
PATCH
W. L-80 HY D 563 XO TO L-80 TCA 1964'
'CSG, 720, L-80 BTC, D=12.347" 2731'
Minimum ID = 2.377" o@ 9410'
3-3116" X 2-7/8" XO
TOPOF 3-12" X 3-1/4" X 2-7/8' LNR
5-12' TBG, 17#, L-80 TCI,
.0232 bpf, D = 4.892"
5-1/2'
5-112' TBGPC, 17#, L-80..0232 bpf. D = 4.892-
TOP OF 7"LNR
4-12' TBG, 12.6#. L-80 BTC, .0152 bpf, D = 3.958'
PST TOC
9-5/8" CSG, 47#,N-80, D = 8.681"
3-12' LNR, 9.3#, 13CR-85 STL,
.0087 bpf, D = 2 992'
7- LNR. 29#, L-80,.0371 bpf, D = 6.164'
6.6#, 13CR-85 TCI 1, .0079 bpf, D = 2J
2-7/8' LNR, 6.5#, 13CR-85 STUL-80 STL,
.0058 bpf, D = 2-441'
SAFETY NOTES: WS READINGS AVERAGE 125
03-1 OA
ppm WHEN ON MI. WELL REQUIRES A SSSV
WHEN ON Ml. WELL ANGLE> 70" @ 9594'. MAX
DLS:32A' @ 9755'. -CHROME LNR'••
1 2338' 1
1 8387' 1
15-12" FB X NP, D = 4.562' 1
9-5/8" LOWER FOC
5-12' HS X NP. ID = 4.567
HES X NP, D = 4.562'
B44'-13.70' DEPLOYMENT SLEEVE, D= 3.00'
8466' 3-12" X NP, D=2.812'
8473'
PERFORATION SLU ARY
OOWAENTS
FEF LOG: BKR MAO ON 0228118
6609'
ANGLE AT TOP PERF: 124° 0 10231'
NDte: Refer to Production DB for his@Drical pert data
SIZE
SPF
INTERVAL
OpmW
DATE
SOZ
2•
6
10231-10251
O
05/10/18
06/06/18
2'
6
10255 - 10283
O
05/09/18
KR'JkD TREE C(O(09/23/18)
2"
6
10329 - 10346
O05/09/18
03/07118
2'
6
10350-10382
O
05/09/18
2-7/8' LNR, 6.5#, 13CR-85 STUL-80 STL,
.0058 bpf, D = 2-441'
SAFETY NOTES: WS READINGS AVERAGE 125
03-1 OA
ppm WHEN ON MI. WELL REQUIRES A SSSV
WHEN ON Ml. WELL ANGLE> 70" @ 9594'. MAX
DLS:32A' @ 9755'. -CHROME LNR'••
1 2338' 1
1 8387' 1
15-12" FB X NP, D = 4.562' 1
9-5/8" LOWER FOC
5-12' HS X NP. ID = 4.567
HES X NP, D = 4.562'
B44'-13.70' DEPLOYMENT SLEEVE, D= 3.00'
8466' 3-12" X NP, D=2.812'
8473'
5-12' FES XN NIP, D = 4.455' BMND
OOWAENTS
CUM
6609'
9-5/8' X 5-1/2' UNIQUE OVERSHOT
8636'
5-12' OTIS SBR ASSY,
6661'
9-5/8"X 5-1/2' OTIS Po -1 PKR, D = 4.734'
8666'
5-12' X 4-12" XO, D = 3.958'
B746'
9-5/8" X 7" BOT LNR HGR D = ?
I 6804- —14-12" OTIS X NP, OJ = 3.813" 1
BEHIND
8849• 4-1/r TT WLEG, D= 3.958• 1 CT LNR
8837' H ELMD TIFLOGO 09/18/86
9162' TOP 7' MKR JOM
917V BOTTOM 7' MKR JOINT
MLLOUT WINDOW (0340A) 9280' - 9287'
9410' 3-3/16' X 2-7/8' XO, D = 2.377'
DATE
REV BY
OOWAENTS
DATE
REV BY COMyBRTS
09107779
R36
ORIGINAL COMPLEnON
03/12/18
RCJJND FNALOOEAPPRDVAL
07127/86
WW1
RWO
05114/18
JCF/JMD INITIAL PERFS
04/04/93
N28E
RWO
06/06/18
JNUJMD ADDED REF 8 BF E_EV
04105/08
N4FS
RWO
09127/18
KR'JkD TREE C(O(09/23/18)
03/01118
N-CDR2
CTDST(03-1(kA)
03/07118
JAD
DRLG HO CORRECPIONS
PRDHOE BAY UGIT
WELL 03-IQA
PE1MT No 217-176
AR ND: 50-029-20361-01
SEC 11, T1 OR R15F 2134' FSL 8 638' FWL
RP Ekploration (Alaska)