Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
218-018
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 04-51 Patch Perfs Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 218-018 50-029-23597-00-00 10385 Conductor Surface Intermediate Production Liner 9028 80 3818 9755 756 10281 20" X 34" 10-3/4" 7" 4-1/2" 8935 48 - 128 47 - 3865 45 - 9800 9617 - 10373 48 - 128 47 - 3764 45 - 8508 8343 - 9017 none 770 2480 5410 8540 none 2280 5210 7240 9020 9920 - 10188 4-1/2" 12.6# 13Cr85 43 - 9623 8616 - 8853 Structural 4-1/2" HES TNT Perm , 9503 , 8240 NO SSSV 9503 8240 Bo York Operations Manager Dave Wages David.Wages@hilcorp.com (907)564 -5006 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028325 43 - 8348 59 461 52881 1504 2536 8750 1965 1455 965 224 n/a 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2023.11.01 15:39:46 - 08'00' Bo York (1248) By Grace Christianson at 10:25 am, Nov 02, 2023 DSR-11/2/23WCB 3-14-2024 RBDMS JSB 110823 ACTIVITYDATE SUMMARY 9/28/2023 ****WELL FLOWING ON ARRIVAL*** DRIFT WITH 30' 45 KB PATCH DRIFT TO 10,050' SLM ***WELL S/I ON DEPARTURE*** 10/12/2023 ***WELL FLOWING ON ARRIVAL*** PT PCE 250LP-3000HP CORRELATE TO YJ PERFORATING RECORD DATED 15-JULY-2022. SET NS 450-368 MONO PAK PATCH AT 9915' - 9945'. CCL STOP DEPTH=9901' MD, CCL TO TOP ME=14'. TOP OF PATCH AT 9911', BOTTOM OF PATCH AT 9951' ***WELL LEFT S/I, DSO NOTIFIED*** Daily Report of Well Operations PBU 04-51 SET NS 450-368 MONO PAK PATCH AT 9915' - 9945'. TOP OF PATCH AT 9911', BOTTOM OF PATCH AT 9951' By Samantha Carlisle at 12:01 pm, Aug 02, 2022 David Douglas Hilcorp North Slope Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt and return one copy of this transmittal. Received By: Date: Hilcorp North Slope, LLC Date: 02/23/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL (23-FEB-2022) Folder Contents: Log Print Files, Reports and Digital Data Files: Well API #PTD #Log Company Log Date Log Type Notes: PBU L-207 50029237020000 221081 HALLIBURTON 1/12/2022 PPROF INCLUDES ANALYSIS PBU 04-51 50029235970000 218018 BAKER 11//24/2021 RPM INCLUDES ANALYSIS PBU 09-38 50029219190000 189021 BAKER 12/1/2021 RPM INCLUDES ANALYSIS PBU 09-39 50029221330000 191012 BAKER 12/6/2021 RPM INCLUDES ANALYSIS PBU 18-02C 50029207620300 213009 BAKER 11/25/2021 RPM INCLUDES ANALYSIS PBU 18-03C 50029207760300 211066 BAKER 11/26/2021 RPM INCLUDES ANALYSIS PBU 18-05A 50029215830100 202219 BAKER 12/8/2021 RPM INCLUDES ANALYSIS PBU Z-32C 50029219240300 213127 BAKER 12/10/2021 RPM INCLUDES ANALYSIS Please include current contact information if different from above. PBU 04-51 50029235970000 218018 BAKER 11//24/2021 RPM INCLUDES ANALYSIS 218-018 T36368 Meredith Guhl Digitally signed by Meredith Guhl Date: 2022.02.25 08:36:20 -09'00' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 04-51 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 218-018 50-029-23597-00-00 10385 Conductor Surface Intermediate Production Liner 9028 80 3818 9755 756 10281 20" X 34" 10-3/4" 7" 4-1/2" 8935 48 - 128 47 - 3865 45 - 9800 9617 - 10373 48 - 128 47 - 3764 45 - 8508 8343 - 9017 none 770 2480 5410 8540 none 2280 5210 7240 9020 9920 - 10188 4-1/2" 12.6# 13Cr85 43 - 9623 8616 - 8853 Structural 4-1/2" HES TNT Perm 9503 9503 8240 Bo York Operations Manager Ryan Thompson Ryan.Thompson@hilcorp.com (907)564 -5280 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final 13.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028325 43 - 8348 1671 65295 45 1821 1821 907 1107 n/a STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2021 Submit Within 30 days or Operations Sr Res Eng: 8240 NO SSSV 650 65348 20 By Samantha Carlisle at 11:40 am, Oct 20, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.10.20 10:01:46 -08'00' Bo York DSR-10/20/21SFD 10/20/2021 RBDMS HEW 10/21/2021 MGR20OCT2021 ACTIVITYDATE SUMMARY 9/23/2021 ***WELL FLOWING ON ARRIVAL*** DRIFT TBG TO TAG @ 10202' SLM w/ 3.50" CENT & 2.50" SAMPLE BAILER (recovered fine sand & shmoo in bailer) DRIFT TBG TO 10150' SLM w/ 30' x 3-3/8" DMY GUNS (3.66" max od, 1600# max pickup weight) ***JOB COMPLETE, WELL LEFT S/I, DSO NOTIFIED OF STATUS*** 10/9/2021 ***WELL S/I ON ARRIVAL *** JOB SCOPE: ADPERF RIH W/ 2-7/8" X 8' GEO RAZOR PERF GUN 6 SPF / 60 DEG PHASE. CORRELATE TO BAKER HUGHES NEUTRON LOG 21-APRIL-2018. PERFORATE INTERVAL: 10180' - 10188'. CCL TO TS= 10'. CCL STOP= 10170'. ***JOB COMPLETE / TURN OVER TO DSO TO POP*** Daily Report of Well Operations PBU 04-51 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Change Approved Program Cl Plug for Reddll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other. ❑ 2. Operator Name. BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number: 218-018 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-23597-00-00 7. Property Designation (Lease Number): ADL 028325 8. Well Name and Number: PBU 0451 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 10385 feel Plugs measured None feet true vertical 9028 feet Junk measured None feet Effective Depth: measured 10281 feet Packer measured 9503 feet true vertical 8935 feet Packer true vertical 8239 feet Casing: Length: Size: MD: TVD: Buret: Collapse: Structural Conductor 80 20" X 34" 48-128 48-128 Surface 3818 10-3/4" 47-3865 47-3764 5210 2480 Intermediate 9755 T' 45-9800 45-8508 7240 5410 Production Liner 756 4-1/2" 12.6# 13" 9617-10373 8343 - 9017 9020 8540 Perforation Depth: Measured depth. 9920-9940 feet True vertical depth: 8616-8634 feet Tubing (size, grade, measured and true vertical depth) 4-1/2' 12.6# 13Cr85 43-9623 43-8348 Packers and SSSV (type, measured and 4-1/2" HES TNT Perm Packer 9503 8239 true vertical depth) 12. Stimulation or cement squeeze summary. Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-MCf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 968 45657 0 1302 871 Subsequent to operation: 1012 61408 0 2001 940 14. Attachments: (required per 20 MC 25.070.25071, & 25 283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ 18. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ IGSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NIA Authorized Name: Worthington, Jessica Contact Name: Worthington, Jessica Authorized Title: Well Intervention Engineer - Contact Email: Jessice.WorthingtoriQbp.com Authorized Signature: te: 12) 1 Contact Phone: +1907 564 4281 Form 10.404 Revised 04/201"Oe7 F Y� �i RBDms*M 17 2018 SubmilOnginalOnly Daily Report of Well Operations 04-51 ACTI V I TYDATE SUMMARY 11/3/2018 ***WELL FLOWING ON ARRIVAL***(perforating) DRIFTED W/ 10' x 2-7/8" DUMMY GUN W/ XN LOCATOR, 2.50" SAMPLE BAILER LOCATED XN @ 9,578' SLM (9,607' MD) (+29' correction),TAG TD @ 10,244' MD (304' RATHOLE) ***WELL LEFT S/l, DSO NOTIFIED OF STATUS*** ***JOB STARTED ON 21 -NOVEMBER-201 8*** (SLB ELINE: PERF) WELL FLOWING ON ARRIVAL. SHUT IN WING. INITIAL SI T/I/O = 2550/1450/0. RU. PT TO 4100 PSI. RUN 1: PERFORATE 9920'- 9930' WITH 2.875" POWERJET OMEGA, 6 SPF, 60 DEG PHASED, 60 SHOTS. RDMO. NOTIFY PAD OP ON DEPARTURE. WELL SHUT IN ON DEPARTURE. FINAL T/I/O = 1755/1250/0. 11/21/2018 ***JOB COMPLETE ON 21 -NOVEMBER -2018*** TWO= 2550/1350/0. Freeze protect tbg and flowline for E line. Pumped 2 bbls 60/40, followed by 38 bbls crude down tbg for freeze protection. Pumpe 5 bbls 60140, followed by 100 bbls crude down flowline for freeze protection. Have IGV closed/Pressure flowline to 11/21/2018 1500 psi. E line still on well at LRS departure. FWHP=1600/1350/0 JATOR= ELS_ - 04-51 20" X 34' COND, 215.5#, A-53, wogs = �a Minimum ID = 3.725" @ 9607' 4-112" HES XN NIPPLE I ESTMAT® TOC (04/19/181 1 SAFETYNOTES: '"'CHROME TBG&LINER•" 2026' 1-14-112" SLB BFL61 SSSV NP, D= 3.812' GAS LFT MIHNORELS ST MD I TVD I DEV I TYPE VLV LATCH PORT DATE 6 3798 3710 36 K8G2DOM£ 2-7/8" BK 16 05107/18 5 5784 5271 38 KBG2 SO BK 20 05/07/18 4 6934 6174 38 KBG-2 OM1' BK 0 04/23118 3 7755 6819 38 KBG-2 DMY BK 0 04123118 2 8452 7367 38 KBG-2 OWBK 0 04/23118 1 9026 7821 35 KBG-2 DAM BK 0 04/23/18 14-1/2" HES X NP, D = 3.813" 1 17- X 4-1/2" HES TNT PKR D = 3.856" 4-12' HES X NP. D = 3.813" 9617' 7'X5" WFD UP w/TEBK SLEEVE &VYFD TOP OF 41/2' LNR 9617 HGR, D = 4.300' 4-1/2' TBG, 12.6#, 13CR-85 VAM TOP, 9623' 9623" 4-1/2" VVLEG. D= 3.958" .0152 bpf, D = 3.958' O SMD TT NOT LOGGED 7" CSG, 4-112' LW 12.641,13CR-86 VAMTOP, I—I 10373• .0152 bpf, D = 3.958" DATE F1EV BY COMMENTS PEWORATION SUNNIARY 04123118 P-272 INTIALCOMPLEnON REFLOG:BKR GDW ON 04121118 0425118 JMD DRLG HO CORRECTIONS ANGLE AT TOP PEW 27' @ 9920' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sgz SHOT SOZ 2-7/8" 6 9920 - 9930 O 1121118 2-718" 6 9930-9940 O 05113118 4-112' LW 12.641,13CR-86 VAMTOP, I—I 10373• .0152 bpf, D = 3.958" DATE F1EV BY COMMENTS DATE RB/ BY COMMENTS 04123118 P-272 INTIALCOMPLEnON 07/10/18 GRN'JMD NPPLE CORRWTDN AT 2026' 0425118 JMD DRLG HO CORRECTIONS 10/15/18 JMJJMD ADD® PEW REF LOG 05/07/18 NS/JAD PTIALODEATEROVAL 11/05/18 AS/JMD PE>F SIZE CORRECTION! 05/1018 JMG/JMlD GLV C10 (05/07118) 11108/18 RCB/JCORRI= MIN D 05/14118 MSrJMD ADMWS(05/13/18) 11/23/18 NXVWJME ADPEWS(11/21/18) 06/11/18 JNJJMD EDIT TO OKB & OONTOLTOR PRUD OE BAY tNT WELL U-51 PERMIT No: 218-018 AR Nr. 50-029-23597-00 SEC 34, T11 N, RI 5F- 4277' FSL & 367 FEL BP Exploration (Alaska) DATA SUBMITTAL COMPLIANCE REPORT 1/9/2019 Permit to Drill 2180180 Well Name/No. PRUDHOE BAY UNIT 04-51 MD 10385 TVD 9028 REQUIRED INFORMATION Completions Date 5/13/2018 Mud Log No Operator BP EXPLORATION (ALASKA) INC. Completion Status 1-0I1 Current Status 1 -OIL Samples No ,/ DATA INFORMATION List of Logs Obtained: MWD/ GR/ RES, MWD/ GR/ RES, MWD/ GR/ RES/ DEN/ NEU Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Type Med/Frmt Number Name Scale Media No ED C 29315 Digital Data ED C 29315 Digital Data ED C 29315 Digital Data ED C 29315 Digital Data ED C 29315 Digital Data ED C 29315 Digital Data ED C 29315 Digital Data ED C 29315 Digital Data ED C 29315 Digital Data ED C 29315 Digital Data ED C 29315 Digital Data ED C 29315 Digital Data AOGCC Page 1 of 2 API No. 50-029-23597-00-00 UIC No Directional Survey Yes (from Master Well Data/Logs) Interval OHI Start Stop CH Received Comments 105 10385 6/8/2018 Electronic Data Set, Filename: 04- 51_BHGE_LTK_FE Composite Drilling Data.las 6/8/2018 Electronic File: 04- 51_BHGE_LTK_2MD_Memory Ddlling_Log.cgm 6/8/2018 Electronic File: 04- 51_BHGE_LTK_2TVDss_Memory DrAng_Log.cgm 6/8/2018 Electronic File: 04- 51_BHGE_LTK_5MD_Memory Drilling_Log.cgm 6/8/2018 Electronic File: 04- 51 BHGE_LTK_5TVDss_Memory Drilling_Log.cgm 6/8/2018 Electronic File: 04-51_BHGE_OTK- VSS_Composite Drilling Dynamics Log.cgm 6/8/2018 Electronic File: 04- (� 51_BHGE_LTK_2MD_Memory Ddlling_Log.pdf 6/8/2018 Electronic File: 04- 51_BHGE_LTK2TVDss_Memory P Ddlling_Log.pdf_ 6/8/2018 Electronic File: 04- 6 51_BHGE_LTK_5MD_Memory Ddlling_Log.pdf - 6/8/2018 Electronic File: 04- r 51 BHGE_LTK_5TVDss_Memory Drilling_Log.pdf 6/8/2018 Electronic File: 04-15_Final Surveys.csv 6/8/2018 Electronic File: 04-15—Final Surveys.xisx Wednesday, January 9, 2019 DATA SUBMITTAL COMPLIANCE REPORT 1/9/2019 Permit to Drill 2160180 Well Name/No. PRUDHOE BAY UNIT 04-51 Operator BP EXPLORATION (ALASKA) INC. API No. 50-029.23597-00-00 MD 10385 TVD 9028 Completion Date 5/13/2018 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 29315 Digital Data 6/8/2018 Electronic File: 04-51 Final Survey Report.pdf ED C 29315 Digital Data 6/8/2018 Electronic File: 04-51 Final Survey Report.txt Log C 29315 Log Header Scans 0 0 2180180 PRUDHOE BAY UNIT 04-51 LOG HEADERS Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report V Production Test Information Y /©A Geologic Markers/Tops O COMPLIANCE HISTORY Completion Date: 5/13/2018 Release Date: 3/18/2018 Description Directional / Inclination Data 6) Mechanical Integrity Test Information Y / NA Daily Operations Summary O Comments: Compliance Reviewed By: — Date Comments Mud Logs, Image Files, Digital Data Y /S) Core Chips Y Composite Logs, Image, Data Files 0 Core Photographs Y/19 Cuttings Samples Y / !\ Laboratory Analyses Y /6) Date: AUG('( Page 2 of 2 Wednesday, January 9, 2019 Martin, Teddy J (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@blaxorn Sent: Tuesday, July 24, 2018 3:18 PM To: AOGCC Reporting (DOA sponsored) Subject: POP PBU 04-51 / PTD # 218-018 Hello, Please reference the following well: Well Name: PBU 04-51 Permit #: 218-018 API#: 50-029-23597-00-00 Date of Test: 6/13/18 Type of Test: IPT (Initial Production Test) Choke Size: 88 Choke Unit: Production Method: Flowing Duration (Hours Tested): 8 Top Reference (Top Perf MD): 9930' Bottom Reference (Bottom Perf MD): 9940' Tubing Flowing (Pressure): 0 Casing Pressure: 1605 Total Test Rate (O, G, W): 224 / 12533 / 96 24 -Hour Rate (O, G, W): 671 / 37600 ! 289 Gravity (Oil, API): N/A GOR (Gas -Oil Ratio): 56002 This well began Production on Method of Operations on this date: June 12, 2018 RBDMS41LAU160 6 2018 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISF' N WELL /MPLETION OR RECOMPLETION REPO, AND LOG � 1C4✓ C o er �:. a_. JUN 11 2018 la. Well Status: Oil ® Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 20AAC 25.105 20AAC 25.110 1b. Well Class: _ a A 1�� y1y1 Q� (I' �(G'V/P�./=� Developme GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One •`/ �, Service ❑ Streligraphic Test ❑ 2. Operator Name: 6, Dale Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 5/13/2018 218-018 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99519-66612 4/10/2018 50-029-23597-00-00 4a. Location of Well (Governmental Section): 8. Date TO Reached: 16. Well Name and Number: 4/21/2018 PBU 0451 9 Ref Elevations KB 76.96 GL 29.50 BF 29.50 ' 17. Field/Pool(s). PRUDHOE BAY, PRUDHOE OIL Surface: 4277' FSL, 362' FEL, Sec. 34, T11N, R15E, UM • 1601' FSL , 3393' L, Sec. 34, T11 N. R15E, UM Top of Productive Interval: � 10. Plug Back Depth(MD/TVD): 18, Property Designation: Total Depth: 1495' FSL, 3616' FEL, Sec. 34, T11N, R15E, UM 10281'/8935' ADL 028325 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11, Total Depth (MD/TVD): 19. DNR Approval Number. Surface: x- 712498 • y- 5950860 Zone - ASP 4 . 10385'/9028' 70-039 12. SSSV Depth(MD/TVD): 20Thickness of Permafrost MDRVD: TPI: x- 709548 y- 5948101 Zone- ASP Total Depth: x- 709328 y- 5947988 Zone - ASP 4 None 1855'/ 1855' 5. Directional or Inclination Survey: Yes 21 (attached) No ❑ 13. Water Depth, if Offshore: 21. R"rill/Lateral Top Wad. MDrrVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) N/A 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma my, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWDI GR/ RES, MWD/GR/RES. MWD/GR/RES/DEN I NEU 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FT GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 29'x 34" 215.5# A-53 48' 128' 48' 128' 42" 20 ou yds Arctic Set 10-3/4" 45.5# L -W 47' 3865' 47' 3764'10 13-1/2" 1911 sx LiteCrete, 259 sx Class'G' 7" 26# L-ae 45' 9800' 4 45' 8508' 9-7/8" 523 sx Class'G' 4-1/2" 12.6# 1xre5 9617' 10373' 8343' 9017' 6-1/8" 154 sx Class'G' 24. Open to production or injection? Yes 0 No ❑ 25. TUBING RECORD GRADE DEPTH SET (MD) PACKER SET (MD/TV If Yes, list each interval open (MD1 VD of Top and Bottom; Perforation Size and Number; Date Perfd): 4-1/2" 12.6# 13Cr85 9623' 9503-18240- 503'/8240'2-1/2" 2-1/2"Gun Diameter, 6 sof 5/13/18 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9930'- 9940' 8625'- 8634' Was hydraulic fracturing used during completion? Yes ❑ No Per 20 AAC 25.283 (i)(2) attach electronic and printed inforna8on COMPLETION DAT ( VE IFIED DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 2200' Freeze Protect w175 ENS Diesel 27. PRODUCTION TEST Date First Production: NU on Prod !on Method of Operation (Floydng, gas lift, etc.): WA Date of Test: Hou -Tested: Produclionfor 011 -Bbl: Gas -MCF: Water -Bbl: Choke Siye Gas -Oil Ratio: Test Pan y Flay Tubing Casing Press: Calculated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gmvty- API (con): Press 24 Hour Rate --*. Form 10-407 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only RB MSS JUN 1 4..1018 p -'o'/ S 28. CORE DATA / Conventional Cores) Yes ❑ No 0 ( Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presenceof oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29, GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Permafrost - Top 28' 28' Well Tested? Yes ❑ No 0 , Permafrost - Base 1883 1883' If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 Top of Productive Interval 9848' 6551' AAC 25.071, Ugnu 5423' 4988' West Salk 7297' 6460' Colville Mudstone 7832' 6880' HRZ 9575' 8305' Shublik / LCU 9814' 8521' Sadlerochit-Zone 4 9848' 8551' Zone 4A 9942' 8636' CGL - Zone 3 10025' 8709' Base of CGL -Zone 2C 10080' 8758' 23SB - Zone 2B 10160' 8828' 21S -Zone 2A 10222' 8883' Zone 1 B 10316' 8966' TDF - Zone 1A 10337' 8985' Base of Sadlerochit - Kavik 10375' 9019' Formation at total depth: Kavik 10375' 9019' 31. List of Attachments: LOT / FIT Summary, Summary of Daily Drilling Reports, Summary of Post -Rig Work, Survey, Cement Reports, As -Built, Wellbore Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070, 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Sperry, Nathan Authorized Title: SIM Sped 11 Contact Email: Nalhan.Sperry@bp.com Authorized Signature: Date: Contact Phone: 907-564-4258 INSTRUCTIONS General: This form is designed for sOditting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item Is. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this (cox. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 512017 Submit ORIGINAL Only TREE= 4-1/16"5M CNV WELLHEAD= GREY ACTUATOR = ---------------------- OKB. FIFA/ = 76.96' BF.RE/_ LATCH KOP= Max Angle = ----- _ 2900' 39' (H 4177' Datum MD= 10215' Datum IV 1) BOW SS 20" X 34" COND, 215.5#, A-53, I[) D = 9.950' Minimum ID = 2.5" @ 2026' DMY PACK OFF INSTALLED IN SVLN IESTMATED TOC(04119/18) I ITOPOF4-i2' LNR 4-12' TBG, 12.60,13CR-85 VAM TOP, 0152 bof. D = 3.958' L-80 VAM PERFORATION SUMMARY REF LOG: ON _/ /_ ANGLE AT TOP PERF: 27' @ 9930' Note: Refer lo production DB for historical pert data SIZE I SPF I INf6ZVAL Opn/Sgz SHOT SOZ 2-1� 9930-9940 � T05/13118� I-12" LNR, 12.6#, 13CR-85 VAMTOP, I--1 110373- .0152 bpf, D = 3.958' 04-51 C SAF-"YNOTES: —CHROME TBG &LINER'•' 2026' -14i2-SLBSVLN,D=3.813' CMAC I FT MANr1RR S ST MD I ND 1 DEVI TYPE VLV LATCH I PORT DATE 63798 3710 36 KBO DONE BK 16 05/07/18 5 5784 5271 38 KBG2 SO BK 20 05/07/18 4 6934 6174 38 K13G2 DMY BK 0 0423/18 3 7755 6819 38 KBG-2 DMY BK 0 0423118 2 8452 7367 38 KBG-2 DMY SK 0 0423/18 1 9026 7821 35 KBG-2 OW BK 0 0423/18 14-1/2* HER X NP. D=3.813' 1 14-1/2' HES X NP. D=3.813" 1 14-12' HES XN NP. D = 3.725' 1 8617' 7' X 5' VVFD LTP w /T183K HGP, 9)=4.300" 8623' 4-12' WLEG. ID = 3.958' ELMD TT NOT LOGGED 9.� 5'X4 -12'X0. D=3.940' DATE REV BY COMMENTS DATE I IREV BY COMMENTS 0423/18 P-272 INITIAL COMPLETION 0425/18 JMD DRI -G HO CORRECTIONS 05/07/18 NS/JMD FINAL ODE APPROVAL 05/10/18 JMG/JMD GLV C/O(05/07/18) 05/14/18 MS/JMJ AD-EWS (05113/18) 06/11/18 JNJJMJ ®IT TO OKB & CONDUCTOR PRUDHOE BAY UNIT VVELL: 04-51 PERMITW: 218-018 Apr No: 50-029-23597-00 SEC 34, Tt t N, R15F 4277' FSL & 362' FEL 13PExploration (Alaska) •34 •34 •20 •21 • 22 • 23 • 24 E • 19 ,`.Jjlu—III •18 •17 •Is �3 SEC. 2 56 2? BB 27 v 1N DS -11 1" BPROJWr IV -00arnhart ; . 00 1 HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS—BUILT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF MARCH 17, 2018. LEGEND: NOTES: � I AS—BUILT IV -00arnhart ; . 00 1 HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS—BUILT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF MARCH 17, 2018. LEGEND: NOTES: AS—BUILT CONDUCTOR 1. ALASKA STATE PLANE COORDINATES ARE NA027 ZONE 4. 2. GEODETIC POSITIONS ARE NAD27. DS4 EXISTING CONDUCTOR 3. BASIS OF LOCATION IS BPXA OPERATOR MONUMENTS 4A @ 4B. 4. BASIS OF ELEVATION IS 8PXA MLLW DATUM. 5. AVERAGE DS4 PAD SCALE FACTOR IS: 0.8999512. GRAPHIC SCALE 6. DATE OF SURVEY: MARCH 17, 2018. 7. REFERENCE FIELD BOOK: NS18-08 PGS. 34-36. 0 250 500 1000 ( IN FEET ) 1 Inch = 500 ft. LOCATED WITHIN PROTRACTED SEC. 34, T. 11 N., R. 15 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC SECTION PAD CELLAR BASE NO. COORDINATES COORDINATES POSITION(DMS) POSITION D.DD OFFSETS ELEVATION BOX EL. FLANGE EL. Y= 5,950,860.11 N(-)2,635.23 70'16'07.601" 70.2687780' 4,277 FSL 04-51 X= 712,497.64E 660.18 148'16'53.130" 148.2814250' 362' FEL 29.8' 29.5' XX.X' >� •�� KLEIN JW bl-�y�/ 'NACIQEMAN of :3 B 16 YR•MNG FRB78 DS4 01 DRILL SITE 4 MET.Ae RO AS -BUILT CONDUCTOR m 1e 1_wo WELL 04-51 1DAW RE"mEley aw Tao>) 27�e Page 1 of 1 BP AMERICA LOT / FIT Summary Well Name: 04-51 Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD -Ft) (TVD -Ft) (pp) (psi) (BHP) (psi) (ppg) 04/15/18 LOT 3,865.00 3,754.33 9.10 1,150.00 2,924.78 15.00 04/21/18 FIT 9,800.00 8,508.00 8.60 708.00 4,508.98 10.20 Page 1 of 1 Printed 6!7/2018 3:49:05PM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 1 of 22 Operation Summary Report Common Well Name: 04-51 AFE No Event Type: DRL- ONSHORE (DON) Start Dale: 4/8/2018 Eno Date. 4/2112018 X3 -018X1 -C: (6,183,936.00) Project: PBU Site: 04 Rig Name/No.: PARKER 272 Spud Daterrime: 4/10/2018 6:00:OOAM Rig Release: 4/23/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB o@76.96ustt (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usfl) 4/8/2018 12:00 - 15:00 3.00 MOB P PRE BEGIN DON EVENTAT 12.00 WITH PARKER RIG 272 GENERAL RIG DOWN OPERATIONS ON NK -26A ,- RIG DOWN RIG FLOOR AND DISCONNECT INTERCONNECTS '- COMPLETE CHECKLIST FOR SKIDDING FLOOR - LOWER PIPE SKATE, MOVE CATTLE CHUTE AND SKID RIG FLOOR 15:00 - 16:00 1.00 MOB P PRE 'COMPLETE CHECKLIST AND LAY OVER MAST ,- MAX 394 KLBS WHILE LAYING OVER MAST 16:00 - 18:30 2.50 MOB P PRE SPLIT MODULES AND PREPARE TO MOVE MODULES TO DSO4 - COMPLETE DISCONNECTING INTERCONNECTS AND FINAL PREPARATIONS _ TO SPLIT MODULES _ 1830 - 2300 4.50 MOB P PRE MOVE ALL THREE MODULES FROM NK TO DSO4 - TOTAL MOVE DISTANCE = 7 MILES - AVERAGE 1.5 MPH 2300 - 0000 1.00 MOB P PRE SPOT DRILL MOD OVER WELL - PICK UP DIVERTER ANNULAR AND FLOW NIPPLE INTO THE BOP DECK WITH THE BRIDGE CRANE PRIOR TO BACKING OVER WELL 4/92018 0000 - 0330 3.50 MOB P 7 PRE SPOT RIG OVER 0451 -SPOT DRILL MOD - MATE UP UTILITY MOD AND MUD MOD TO DRILLMOD 0330 - 0730 4.00 RIGU P PRE GENERAL RIG UP OPERATIONS - HOOK UP INTERCONNECTS - TRANSFER POWER TO MAIN GENERATORS - PERFORM CHECKLIST FOR RAISING THE DERRICK - RAISE THE DERRICK, 552 KLBS OBSERVED - PERFORM CHECKLIST FOR SKIDDING THE FLOOR -SKID FLOORAND CATTLE CHUTE - RAISE PIPE SKATE - INSTALL WALKWAYS AND HANDRAILS ON ROOFTOP - RIG UP FLOOR MANRIDERS - BRIDLE DOWN Printed 6!7/2018 3:49:05PM *All depths reported in Drillers Depths* Common Well Name: 04-51 Event Type: DRL- ONSHORE (DON) Project: PBU North America - ALASKA - 8P Page 2 of 22 Operation Summary Report AFE No Start Date'. 4/18 End Date' 4/21/2018 X3 -018X1 -C'. (6,183,936 00 ) Site. 04 Rig Name/Na.: PARKER 272 Spud Date/Time: 4/10/2018 6:00:OOAM Rig Release: 4123/2018 Rig Contractor PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 07:30 - 22:30 15.00 RIGU P PRE NIPPLE UP DIVERTER SYSTEM - INSTALL RISER SPOOLS -MAKE UP KNIFE VALVE - PICK UP DIVERTER ANNULAR - INSTALL DIVERTER LINE OUT THE BACK OF THE BOP DECK TORQUE ALL BOLTS TO SPEC SIMOPS: '- RIG UP SURFACE LINES ON RIG FLOOR �-CALIBRATE BLOCK HEIGHTAND PERFORM I CROWN CHECK - CLEAN OUT MUD PUMP SUCTION LINES QUADCO ON LOCATION TO CALIBRATE PITS •- BUILD 5" HWDP STANDS IN OFFLINE STAND ,BUILDER —ACCEPT_ RIG_ AT 12:0_0 HRS 22:30 - 00:00 1.50 RIGU P PRE PERFORM FUNCTION TEST ON THE 4/10/2018 00:00 - 01:00 1.00 RIGU P 01:00 - 02:00 1.00 RIGU DIVERTER SYSTEM - TROUBLESHOOT ANNULAR CLOSING FASTER THAN THE KNIFE VALVE OPENING - RUN i STAND OF PIPE FOR DIVERTER TEST DID NOT ENCOUNTER ICE OR FILL IN 89' - HOLD PRESPUD WITH RIG CREW DURING PRETOUR MEETING PRE FUNCTION TEST DIVERTER SYSTEM - KNIFE VAVLE OPEN IN 28 SECONDS - DIVERTER ANNULAR CLOSED IN 34 SECONDS - PERFORM DRAW DOWN TEST - SIMOPS: - MAKE UP STANDS OF 5" HWDP WITH OFFLINE STAND BUILDING EQUIPMENT P PRE INSTALL FLOW RISER -MEASURE RKBS 06.00 - 07:30 1.50 DRILL P - SIMOPS: -MAKE UP STANDS OF 5" HWDP WITH 02:00 - 04:00 2.00 RIGU P - TEST GYRO ON PIPE SKATE (PASS) _ PRE HOLD RIG EVAC/1-12S/DIVERTER DRILL 04:00 - 04:30 0.50 RIGU P 0430 - 060051 0 DRILL P 06.00 - 07:30 1.50 DRILL P Printed 617/2018 349'05PM 'All depths reported in Drillers Depths' - SIMOPS: -MAKE UP STANDS OF 5" HWDP WITH OFFLINE STAND BUILDING EQUIPMENT _ PRE RIG UP GYRO ON E -LINE - TEST GYRO ON PIPE SKATE (PASS) _ PRE HOLD RIG EVAC/1-12S/DIVERTER DRILL 127.00 SURF MAKE UP 13-1/2" MILLTOOTH TRICONE BIT, 8" MOTOR WITH 1.5-AKO, UBHO, AND 1 STAND OF 5" HWDP TO 124' MD - FILL PIPE AND LEAKTIGHT TEST SURFACE LINES TO 3500 PSI - CLEAN OUT TO THE BOTTOM OF THE CONDUCTOR AT 127' MD, DID NOT TAG FILL OR ICE _ 217.00 SURF SPUD WELLAND DRILL 13-1/2" SURFACE HOLE SECTION FROM 127' MD TO 217' MD - 350 GPM, 350 PSI, 50 RPM, 1 KFT-LBS TORQUE, 4-5 WOB GYRO EVERY -100' PER WELL PROGRAM Printed 617/2018 349'05PM 'All depths reported in Drillers Depths' North America - ALASKA -BP Operation Summary Report Page 3 of 22 Common Well Name: 04-51 ARE No Event Type: DRL-ONSHORE (DON) Start Date: 4/8/2018 End Date. 4/21/2018 X3 -018X1 -Q (6,183,936.00 ) Project: PBU Site: 04 Rig Name/No.: PARKER 272 Spud Daterrime: 4/10/2018 6:00:OOAM Rig Release: 4/23/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usfl (above Mean Sea Level Date From - To His Task Code NPT Total Depth Phase Description of Operations (hal_. lust) 07:30 - 08:00 0.50 DRILL P 217.00 SURF STAND BACK 2 STANDS OF HWDP AND MAKE 0800 - 1800 10.00 DRILL P 18.00 - 0000 600 DRILL 4/11/2018 0000 - 0600 6.00 DRILL 738.00 P -1,202.00 P 1 639 00 UP THE REST OF THE SURFACE HOLE BHA TO 185' MDAND RUN IN THE HOLE TO 217' MD - MOVE UBHO, MAKE UP ONTRAK MWDAND _ NON MAG DC'S _ SURF DIRECTIONAL DRILL 13-1/2" SURFACE HOLE FROM 217'MD TO 738'MD, (52VIN 10 HRS= 52 FPH WITH CONNECTIONS & SURVEYS). 130-200 FPH INSTANTANEOUS ROP 550 GPM, 1100 PSI ON BOTTOM, 1000 PSI OFF BOTTOM, 50 RPM WHEN ROTATING, 2 KFT-LBS TORQUE ON BOTTOM, 1 KFT-LBS TORQUE OFF BOTTOM, 15 KLBS WOB - WIPE 30' WITH AFTER DRILLING STAND DOWN PRIOR TO GYRO SURVEYS - GYRO SURVEY EVERY 90' MD - MW IN/OUT = 8.8 / 8.8 PPG - NO LOSSES - FLOW LINE TEMP = 50 DEGF -GEOLOGY TOPS -G7=516'MD - FLOW PADDLE BYPASSED PER PTD. SURF DIRECTIONAL DRILL 13-1/2" SURFACE HOLE FROM 738' MD TO 1202' MD, (464' IN 6 HRS = 77 FPH WITH CONNECTIONS & SURVEYS) - 130-200 FPH INSTANTANEOUS ROP - 580 GPM, 1400 PSI ON BOTTOM, 1300 PSI OFF BOTTOM, 50 RPM WHEN ROTATING, 3 KFT-LBS TORQUE ON BOTTOM, i KFT-LBS TORQUE OFF BOTTOM, 15 KLBS WOB - WIPE 30' WITH AFTER DRILLING STAND DOWN PRIOR TO GYRO SURVEYS - GYRO SURVEY EVERY 90' MD - MW IN/OUT= 8.8 / 8.8 PPG NO LOSSES - FLOW LINE TEMP = 53 DEGF -GEOLOGY TOPS -G7=516'MD - FLOW PADDLE INSTALLED AT 1000' MD SURF DIRECTIONAL DRILL 13-112" SURFACE HOLE FROM 1202' MD TO 1639' MD (437' IN 6 HRS = 73 FPH WITH CONNECTIONS & SURVEYS) - 130-200 FPH INSTANTANEOUS ROP - 580 GPM, 1500 PSI ON BOTTOM, 1400 PSI OFF BOTTOM, 50 RPM WHEN ROTATING, 3 KFT-LBS TORQUE ON BOTTOM, 2 KFT-LBS TORQUE OFF BOTTOM, 15-20 KLBS WOB - WIPE 30' WITH AFTER DRILLING STAND DOWN PRIOR TO GYRO SURVEYS - GYRO SURVEY EVERY STAND - MW IN/OUT = 8.8 / 8.8 PPG - NO LOSSES - FLOW LINE TEMP = 53 DEGF - RECIEVE BAD MWD SURVEYAT 1202' MD BIT DEPTH, DISCUSS WITH ODE, BAKER DEVELOP NEW DIRECTIONAL PLAN WITH GYRO SURVEY DOWN TO TD AT 3893' MD. Printed 6!7/2018 3:49:05PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 4 of 22 Common Well Name: 04-51 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 4/8/2018 End Date. 4/21/2018 X3 -018X1 -C. (6,183.93600) Project: PBU Site: 04 Rig Name/No.: PARKER 272 Spud Date/Time: 4/10/2018 6:00:DOAM Rig Release: 4/23/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To His Task Code NPT Tom]Depth Phase Description of Operations (hr) (usft) _. 08:00 - 12:00 6.00 DRILL P 2,425.00 SURF DIRECTIONAL DRILL 73-1/2" SURFACE HOLE FROM 1639' MD TO 2425' MD (786' IN 6 HRS = 131 FPH WITH CONNECTIONS 8 SURVEYS) - 200-300 FPH SLIDING AND UP TO 450 FPH ROTATING INSTANTANEOUS ROP - 625 GPM ROTATING / 550 GPM SLIDING FOR DIRECTIONAL CONTROL, 2000 / 1550 PSI ON BOTTOM, 175011400 PSI OFF BOTTOM, 50 RPM WHEN ROTATING, 4-5 KFT-LBS TORQUE ON BOTTOM, 2 KFT-LBS TORQUE OFF BOTTOM, 20-30 KLBS WOB - DRILL AHEAD WITH CLEAN MWD SURVEYS -SURVEY EVERY STAND - MW IN/OUT= 8.9 / 8.9 PPG -NO LOSSES - FLOW LINE TEMP = 57 DEGF GEOLOGY _TOPS -BPRF=1_883'MD 12:00 - 21:00 9.00 DRILL P 3,310.00 SURF _- DIRECTIONAL DRILL 13-1/2" SURFACE HOLE FROM 2425' MD TO 3310' MD (885' IN 6 HRS = 148 FPH WITH CONNECTIONS 8 SURVEYS) '- 150-200 FPH SLIDING AND UP TO 500 FPH ROTATING INSTANTANEOUS ROP -- 650 GPM ROTATING / 550 GPM SLIDING FOR DIRECTIONAL CONTROL, 2400 / 1700 PSI ON 'BOTTOM, 2100/1500 PSI OFF BOTTOM, 50 RPM WHEN ROTATING, 7-9 KFT-LBS TORQUE ON BOTTOM, 2 KFT-LBS TORQUE OFF BOTTOM, UP TO 40 KLBS WOB - DRILL AHEAD WITH CLEAN MWD SURVEYS - SURVEY EVERY STAND -MW IN/OUT=9.0/9.0 PPG -NO LOSSES - FLOW LINE TEMP = 63 DEGF -GEOLOGY TOPS - SV6 = 2516'MD, EOCU= 3197' MD - LAST 30' NO CUTTINGS RETURNS, NO LOSSES, MUD RHEOLOGY ON UPPER END OF MUD SPECS, DECISION MADE TO ROTATE AND RECIPROCATE LAST 30' AND CIRCULATE BOTTOMS UP TO CLEAN HOLE 21:00 - 21:30 0.50 DRILL P 3,310.00 SURF ROTATE AND RECIPROCATE 30'AND CIRCULATE BOTTOMS UP TO CLEAN HOLE - 650 GPM, 2000 PSI - OBSERVE CUTTINGS BACK AT SHAKERS AT THE START OF THE BOTTOMS UP AND CLEAN UP TOWARD THE END OF THE BOTTOMS UP - DECISION MADE TO START SLIDING AT HIGHER GPM TO MAINTAIN AV DURING SLIDING Printed 6/7/2018 3:49:05PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 5 of 22 Common Well Name: 04-51 - 06:30 1.50 DRILL P AFE No Event Type: DRL- ONSHORE (DON) 2.50 Start Date: 4/8/2018 End Date. 4/21/2018 X3 -018X1 -C: (6,183,936.00 ) Project: PBU 1950 PSI OFF BOTTOM, 50 RPM WHEN Site: 04 ROTATING, 7-9 KFT-LBS TORQUE ON Rig Name/No.: PARKER 272 Spud Date/Time: 4/10/2018 6,00.00AM Rig Release: 4/23/2018 Rig Contractor: PARKER DRILLING CO. i- SURVEY EVERY STAND -MW IN/OUT=9.0/9.0 PPG BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) - FLOW LINE TEMP = 68 DEGF Date From - To Hire Task Code NPT Total Depth Phase Description of Operations FROM 3514' MD TO 3875' MD (36V IN 4.5 HRS = (hr) _ _ _ (usft) _ 21:30 - 0000 2.50 DRILL P 3,514.00 SURF DIRECTIONAL DRILL 13-1/2" SURFACE HOLE 4/12/2018 0000 - 0500 5.00 DRILL P 05:00 - 06:30 1.50 DRILL P -150-200 FPH SLIDING AND UP TO 500 FPH 2.50 DRILL P 06:30 - 09:00 -09:00 - 12:00 3.00 DRILL P 12:00 - 15:00 3.00 DRILL P Printed 8!//2018 3:49:05PM *Ali depths reported in Drillers Depths' FROM 3310' MD TO 3514' MD (204' IN 6 HRS = 82 FPH WITH CONNECTIONS & SURVEYS) -150-200 FPH SLIDING AND UP TO 500 FPH ROTATING INSTANTANEOUS ROP -650 GPM ROTATING, 2200 PSI ON BOTTOM, 1950 PSI OFF BOTTOM, 50 RPM WHEN ROTATING, 7-9 KFT-LBS TORQUE ON BOTTOM, 2 KFT-LBS TORQUE OFF BOTTOM, 'UP TO 40 KLBS WOB '- DRILLAHEAD WITH CLEAN MWD SURVEYS i- SURVEY EVERY STAND -MW IN/OUT=9.0/9.0 PPG - NO LOSSES - FLOW LINE TEMP = 68 DEGF zGEOLOGY _TOPS -SV4=3320'MD _ 3,884.00 SURF DIRECTIONAL DRILL 13-1/2" SURFACE HOLE FROM 3514' MD TO 3875' MD (36V IN 4.5 HRS = 80 FPH WITH CONNECTtMS & SURVEYS) - 150-200 FPH SLIDING AND UP TO 500 FPH ROTATING INSTANTANEOUS ROP -650 GPM ROTATING, 2200 PSI ON BOTTOM, 1950 PSI OFF BOTTOM, 50 RPM WHEN ROTATING, 7-9 KFT-LBS TORQUE ON BOTTOM, 2 KFT-LBS TORQUE OFF BOTTOM, UP TO 40 KLBS WOB - DRILLAHEAD WITH CLEAN MWD SURVEYS - SURVEY EVERY STAND -MW IN/OUT=&1 PPG -NO LOSSES -FLOW LINE TEMP =68DE_G_F 3,884.00 SURF CIRCULATE HOLE CLEAN - 650 GPM, 2100 PSI - 50 RPM, 4 KFT-LBS TORQUE - RACK BACK 1 STAND EVERY 30 MINUTES - MUD WEIGHT IN/OUT = 9.1 PPG 3,864.00 SURF PULL OUT OF THE HOLE ON ELEVATORS FROM 3858' MD TO TOP OF BHA AT 277' MD - MONITOR WELL FOR 10 MINUTES BEFORE PULLING OFF BOTTOM: STATIC - PU = 170 KLBS, SO - 150 KLBS AT 3658' MD -MUD WEIGHT IN/OUT=9.I PPG - MONITOR HOLE FILL WITH TRIP TANK: GOOD HOLE FILL, NO SIGNS OF SWABBING - NO OVERPULL OR ISSUES COMING OUT OF THE HOLE _ 3,884.00 SURF RUN IN THE HOLE FROM 277' MD TO 3875' MD ON ELEVATORS - FILL PIPE EVERY 2000' - MONITOR DISPLACEMENT WITH TRIP TANK GOOD DISPLACEMENT - NO ISSUES RUNNING IN THE HOLE - PU = 170 KLBS, SO = 150 KLBS AT 3800' MD _ -MUD WEIGHT IN/OUT =9.I PPG 3,884.00 SURF CIRCULATE 3.SX BOTTOMS UP - 700 GPM, 2250 PSI - 70 RPM, 34 KFT-LBS TORQUE - PULL 7 STANDS WHILE CIRCULATING '- MUD WEIGHT IN/OUT = 9.1 PPG Printed 8!//2018 3:49:05PM *Ali depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: 04-51 Event Type: DRL-ONSHORE (DON) - 19:30 Start Date 4/8/2018 Project: PBU - 20:30 Site: 04 Rig Name/No.: PARKER 272 - 22:30 Spud Date/Time: 4/1 Rig Contractor: PARKER DRILLING CO. - 00.00 1.50 Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Hrs Task Code (hr) 15:00 - 17:30 2.50 DRILL P 17:30 - 19:30 2.00 19:30 - 20:30 1.00 20:30 - 22:30 200 22'.30 - 00.00 1.50 4/13/2018 0000 - 0500 5.00 0500 - 1200 Too DRILL P DRILL P CASING P CASING P CASING P CASING P Page 6 of 22 AFE No End Date. 4/21/2018 X3 -018X1 -C: (6,183,936.00 ) Rig Release: 4/23/2018 NPT Total Depth Phase Description of Operations (usft) 3,884.00 SURF PULL OUT OF THE HOLE ON ELEVATORS FROM 3175' MD TO 185' MD - MONITOR WELL FOR 10 MINUTES BEFORE PULLING OFF BOTTOM: STATIC - PU = 155 KLBS, SO = 145 KLBS AT 3175' MO -MUD WEIGHT IN/OUT=9.I PPG - MONITOR HOLE FILL WITH TRIP TANK -GOOD HOLE FILL, NO SIGNS OF SWABBING 3,884.00 SURF LAY DOWN 13-1/2" DRILLING BHA FROM 185' MD TO SURFACE PER BAKER DO AND MWD _-BIT GRADE: 1-1 WT -A -E -1 -NO -TD 3,88C00 3,884.00 SURF CLEAN AND CLEAR RIG FLOOR 3,884.00 SURF RIG UP TO RUN 45.5#, L-80, BTC AND VAM 21 10-3/4" CASING -RIG UP AND FUNCTION TEST CASING TONGS �- MAKE UP VOLANT TOOLAND INSTALL BAIL EXTENSIONS - HOLD PRE JOB SAFETY MEETING FOR f RUNNING_ 10-3/4" CASING_ 3,884.00 SURF RUN 10-3/4", 45.5#, L-80, BTC CASING FROM SURFACE TO 12T MD :- MAKE UPAND BAKER LOK SHOE TRACK CHECK FLOATS: GOOD - USE BEST 0 LIFE PIPE DOPE FOR BTC CONNECTIONS - TORQUE CONNECTIONS TO THE MARK FOR BTC - RUN 1 CENTRALIZER ON JOINTS 1-95 - OBTAIN PU/SO WEIGHTS EVERY 410 FT -MUD WEIGHT IN/OUT =9.I PPG 3,884.00 SURF RUN 10-3/4", 45.5#, L-80, BTC CASING FROM SURFACE TO 2295 MD - USE BEST O LIFE PIPE DOPE FOR BTC CONNECTIONS - TORQUE CONNECTIONS TO THE MARK FOR BTC - CROSS OVER TO VAM 21 AFTER JOINT 52 - RUN 1 CENTRALIZER ON JOINTS 1-52 -OBTAIN PU/SO WEIGHTS EVERY -400 FT, PU = 120 KLBS, SO = 110 KLBSAT 2038' MD -MUD LOSSES WHILE RUNNING IN THE HOLE: 32 BELS -MUD WEIGHT IN/OUT= 9.1 PPG - BREAK CIRCULATION EVERY 10 JOINTS UNTIL THE TOP OF PERMAFROST. FILL JOINTS ON THE FLY TO THE BASE OF THE _ ___ _ PERMAFROST AT 1962' MD. 3,884.00 SURF RUN 10-3/4", 45.5#, L-80, VAM 21 CASING FROM 2295' MD TO 3865' MD - MAKE UP CROSSOVffR-J-OINT FROM BTC TO VAM 21 WITH FREE FLOATING CENTRALIZER - USE JET LUBE SEA GUARD PIPE DOPE - TORQUE CONNECTINOS TO 26,250 FT -LBS - RUN 1 CENTRALIZER ON JOINTS 53-89 - OBTAIN PU/SO WEIGHTS EVERY -400 FT - PU = 205 KLBS, SO = 168 KLBS AT 3865' MD -MUD WEIGHT IN/OUT=9.I PPG Printed 6/7/2018 3,4905PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 7 of 22 Common Well Name: 04-51 AFE No Event Type: DRL-ONSHORE (DON) Start Date. 4/8/2018 End Date. 421/2018 X3 -018X1 -C: (6,183,936.00 ) Project: PBU Site: 04 Rig Name/No.: PARKER 272 Spud Date/Time: 4/102018 8:00:00AM Rig Release: 4/23/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usR) 12:00 - 18:00 4.00 _ CASING P 3,864.00 SURF STAGE UP TO CEMENTING RATE IN 1 BPM INCREMENTS TO FINAL CIRCULATING RATE OF 10 BPM. @ 2 BPM: 335 PSI, 30% RETURN FLOW @ 3 BPM: 345 PSI, 54% RETURN FLOW @ 4 BPM: 355 PSI, 63% RETURN FLOW @ 5 BPM: 360 PSI, 66% RETURN FLOW @ 6 BPM, 365 PSI, 66% RETURN FLOW @ 7 BPM, 364 PSI, 66% RETURN FLOW @ 8 BPM, 350 PSI, 70% RETURN FLOW @ 9 BPM, 355 PSI, 70% RETURN FLOW @ 10 BPM, 340 PSI, 70% RETURN FLOW - INITIAL PRESSURE AT CEMENTING RATE: 340 PSI - FINAL PRESSURE AT CEMENTING RATE ,AFTER HOLE CONDITIONED: 215 PSI - CIRCULATE A TOTAL OF 4 TIMES BOTTOMS UP - RECIPROCATED PIPE 15 FT AT SURFACE Printed 617/2618 3:49:05PN1 *All depths reported in Drillers Depths' North America - ALASKA- BP Operation Summary Report Common Well Name: 04-51 AFE No End Date. 4/21/2018 Event Type: DRL- ONSHORE (DON) 6:00:00AM Start Date. 4/8/2018 Project: PBU BPUOI: Site: 04 Rig Name/No.: PARKER 272 (usft) Spud DaleTme: 4/10/2018 Rig Contractor: PARKER DRILLING CO. CEMENT 10-3/4", 45.5#, L-80 VAM 21 SURFACE Active datum: 04.51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Hrs Task Code NPT INVOLVED PARTIES. REVIEW PRESSURE (hr) CROSSCHECK. 16:00 - 21:30 5.50 CEMT P Page 8 of 22 Printed 6/7/2018 3:49:05PM `All depths reported in Drillers Depths' AFE No End Date. 4/21/2018 X3 -018X1 -C:(6,183,936.00) 6:00:00AM Rig Release: 4/23/2018 BPUOI: Total Depth Phase Description of Operations (usft) 3,884.00 SURF CEMENT 10-3/4", 45.5#, L-80 VAM 21 SURFACE CASING PER SLB FINAL CADE AS FOLLOWS: - HOLD PRE JOB SAFETY MEETING WITH ALL INVOLVED PARTIES. REVIEW PRESSURE CROSSCHECK. -CREW MEMBER CHECKING SURROUNDING WELLHOUSES THROUGHOUT CEMENT JOB FOR SIGNS OF BROACHING. - PRESSURE TEST CEMENT LINES TO 250 PSI LOW/ 4000 PSI HIGH WITH 10 BBLS 'MUDPUSH, VISUAL LEAK TIGHT TEST: GOOD - PUMP 100 BELS OF 10 PPG MUDPUSH II SPACER @ 6 BPM, 250 PSI - DISENGAGE VOLANT TOOLAND RELEASE BOTTOM PLUG. VISUALLY INSPECT BURST DISC AFTER PUSHING DOWN WITH PLUG LAUNCHING TOOL (INTACT) '- PUMP -650 BBLS 1911 SACKS OF 11 PPG LITE 0 AFR A 40 'EXCESS BELOW THE PERMAFROST (YIELD 1.91 CU.FT/SK) -OBSERVE BOTTOM PLUG LAND. BURST DISC WITH 700 PSI DIFFERENTIAL - ISSUES WITH TRACKING ACTUAL CEMENT VOLUME PUMPED DUE TO ISSUES WITH SCHLUMBERGER MICROMOTION. MICROMOTION REPORTING 2XACTUAL VOLUME PUMPED. ESTIMATED CEMENT VOLUME PUMPED -650 BBLS. - PUMP 54 BBLS 260 SACKS OF15.8 PPG SK) - DISENGAGE TOP PLUG -SCHLUMBERGER KICK OUT WITH 15 BBLS FRESH WATER - PERFORM DISPLACEMENT WITH RIG PUMPS AND 9.1 PPG MUD PER $LB CEMENTICS PROGRAM - 150 BBLS DISPLACED AT 10 BPM: ICP 580 PSI 24% RETURN FLOW, FCP 650 PSI 89% RETURN FLOW - 185 BELS DISPLACED AT 7 BPM: ICP 415 PSI 23% RETURN FLOW, FCP 955 PSI 20% RETURN FLOW - REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE 650 %O � PSI -DO NOT OBSERVE PLUG BUMP AT MAXIMUM ` Q� STROKE COUNT OF 3825 STROKES. HOLD �7 Q 650 PSI ON SYSTEM. DISCUSS WITH ENGINEER AND WSUP. AND DECIDE TO �J CHECK FLOATS. BLEED OFF PRESSURE TO CHECK FLOATS - FLOATS GOOD. - TOTAL DISPLACEMENT VOLUME 365 BBLS (MEASURED BY STROKES @ 96% PUMP EFFICIENCY) -186 BBLS OF GOOD CEMENT RETURNED TO SURFACE - CEMENT IN PLACE AT 21:05 ON 4/13/2018 - LEAD CEMENT REACHES 500 PSI COMPRESSIVE STRENGTH AFTER XX HRS XX Printed 6/7/2018 3:49:05PM `All depths reported in Drillers Depths' Common Well Name: 04-51 Event Type: DRL- ONSHORE(DON) Proiect: PBU North America - ALASKA - BP Page 9 or 22 Operation Summary Report Start Date: 4/8/2018 End Date: 4/21/2018 Site: 04 Soud Date rims: 4/10/2018 6o0o0AM AFE No K3 -018X1 -C:(6,183,936.00) Rig Release: 4/23/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ - _ (usft) 21:30 - 0000 2.50 CASING 4/14/2018 00:00 - 01:00 1.00 CASING 01:00 - 05:00 4.00 CASING 05:00 - 07:30 2.50 CASING 07:30 - 10:30 3.00 CASING 10:30 - 12:30 2.00 BOPSUR 1230 - 1730 5.00 BOPSUR Printed 6(//2018 3:49:05PM *All depths reported in Drillers Depths` MINS AT XX:XX ON 04/14/2018 STILL WAITING ON UCA P 3,884.00 SURF RIG DOWN CASING EQUIPMENTAND CEMENTING EQUIPMENT '- FLUSH STACK WITH BLACK WATER - LAY DOWN LANDING JOINT - FUNCTION ANNULAR SEVERAL TIMES '- WASH SURFACE STACKAND KNIFE VALVE - RIG DOWN POWER TONGS AND VOLANT TOOL - RIG DOWN BAIL EXTENSIONS AND SIDE DOOR ELEVATORS P 3,884.26 SURF BACK OUTAND LAY DOWN LANDING JOINT. BLOW DOWN CEMENT LINE. RIG DOWN VOLANT AND CASING TONGS. P 3,884.00 SURF NIPPLE DOWN HIGH PRESSURE RISERSAND KNIFE VALVE - PULL FLOW RISER AND REMOVE TURN BUCKLES - REMOVE HIGH PRESSURE RISERS FROM SOP DECKAND LAY DOWN BEHIND RIG - NIPPLE DOWN DIVERTER SYSTEM -REMOVE 4" VALVES P 3,884.00 ! SURF INSTALL CASING SPOOLAND TUBING SPOOL -ORIENT PER FMC, PLACE ON RINGAND LOCKDOWN j - LOWER DOUBLE STUD ADAPTER AND HIGH PRESSURE RISERS - PICK UP STACKAND SETAT WELL CENTER - TEST METAL TO METAL SEAL TO 1000 PSI FOR 15 MINUTES PER FMC REP_ _ P 3,884.00 SURF TORQUE ALL FLANGES. INSTALL TURN BUCKLESAND LOWER FLOW RISER. ,MEASURE RKBS. SIMOPS: PRESSURE TEST CHOKE MANIFOLD OFFLINE. MAKE UP 5" AND 4" VALVE (ASSEMBLIES. P 3,884.00 _ SURF i RIG UP TO TEST ROPE -MAKEUP 7" TEST JOINTAND RUN IN HOLE WITH TEST PLUG - FILL UP STACK AND CHOKE - INSTALL SECONDARY VALVES ON WELLHEAD _-INSTALL 4" BULL PLUGS IN CONDUCTOR P 3,884.00 SURF PRESSURE TEST BOPE TO 250 PSI LOWAND 500 PSI HIGH FOR FIVE MIN EACH FOLLOWING AOGCC REGULATIONS AND BP STANDARDS - PERFORM SHELL TEST AND RE -TORQUE BOLTS - TEST WITH 7",5" AND 4" TEST JOINTS -PERFORM BLACKOUT L PANELS -TESTALARMS, PVTAND FLOW SHOW - TEST RAM LOCKS AND HIGH BYPASS ON INITIAL TEST - SEE ATTACHED PRESSURE TESTING CHART -TEST WITNESS WAIVED BY AOGCC REPRESENTATIVE GUY COOK Printed 6(//2018 3:49:05PM *All depths reported in Drillers Depths` North America - ALASKA- SP Operation Summary Report Common Well Name: 04-51 00:00 - 02:00 AFE No Event Type: DRL- ONSHORE (DON) Project PBU Start Date: 4/8/2018 Site: 04 End Date: 4/21/2018 X3-010 Rig Name/No.: PARKER 272 Spud Date/rime: 4/10/2018 6:00:00AM Rig Rele Rig Contractor: PARKER DRILLING CO. Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) BACK TO TRIP TANK BPUOL Date From - To Hrs (hr) Task Code NPT Total Depth Phase (usft) Page 10 of 22 (6,183 936.00 ) e: 4/23/2018 Description of Operations 17:30 - 18:30 1.00 BOPSUR P 3,884.00 SURF RIG DOWN BOPE TEST EQUIPMENT. PULL 1830 - 1930 1.00 CEMT 19:30 - 20:00 0.50 CEMT 2000 - 21.:30 DRILL 21:30 - 0000 2.50 DRILL 4/15/2018 00:00 - 02:00 2.00 DRILL SURF PRESSURE TEST 10-3/4" CASING TO 3500 PSI 0200 - 0730 5.50 DRILL 07:30 - 08:30 1.00 DRILL Printed 677/2018 3'.49'.05PM *All depths reported in Drillers Depths` TEST PLUG AND INSTALL 9-15/16" WEAR _ RING. _ P 3,884.00 SURF PRESSURE TEST 10-3/4" CASING TO 3500 PSI FOR 30 MINUTES AND RECORD --- N,CHART ,CHART. - 6.3 BBLS TO PRESSURE UP, 6.3 BBLS BLED BACK TO TRIP TANK - PASSING TEST, RECIEVE AUTHORIZATION TO PROCEED FROM ACTING WSUP - SEE ATTACHED TEST DOCUMENTATION AND CHART BLOW DOWN SURFACE LINES P 1 3,884.00 SURF LUBRICATE RIG. L_ P 3,884.00 SURF MAKEUP 9-7/8" INTERMEDIATE DRILLING BHA PER BAKER DD/MWD FROM SURFACE TO 145' MD - TCK66 PDC BIT, ROTARY STEERABLE, ONTRAK, BCPM, INTERFACE SUB - PU = 50 KLBS, SO = 50 KLBS - MONITOR DISPLACEMENT WITH TRIP TANK 1GOOD DISPLACEMENT __ _-MUD WEIGHT IN/OUT=9.I PPG _'-I} P 3,884.00 SURF RUN IN THE HOLE ON ELEVATORS WITH 5" HWDP AND 5" WDP STANDS FROM 145TO 2503* MD - PU = 130 KLBS, SO = 125 KLBS -MONITOR DISPLACEMENT WITH TRIP TANK GOOD DISPLACEMENT - MUD WEIGHT IN/OUT = 9.1 PPG - SHALLOW HOLE TEST MWD TOOLS: GOOD TEST P 3,884.00 SURF RUN IN THE HOLE ON ELEVATORS WITH 5" HWDPAND 5" WDP STANDS FROM 2503' MD TO 3536' MD - TAG CEMENT STRINGERS AT 3536' MD -MONITOR DISPLACEMENT WITH TRIP TANK. GOOD DISPLACEMENT _-MUDW_EIGHTIN/OUT=9.IPPG P 3,884.00 SURF DRILL UP CEMENT FROM 3536' MD OT 3854' MD - WASH AND REAM DOWN THROUGH CEMENT STRINGERS FROM 3536' TO 3560' MD - TOP OF CEMENT OBSERVED 270'/ 27 BBLS HIGH - TAG FIRST PLUG @ 3581' MD AND SEEN AT SHAKERS -TAGGED SECOND PLUG AT 3774' MD ON TOP OF FLOAT COLLAR -450 GPM, 1250 PSI ON, 1085 PSI OFF - 60 RPM, 5 KFT-LBS TORQUE ON BOTTOM, 3 KFT-LBS TORQUE OFF BOTTOM - 5-7 KLBS WOB - MUD WEIGHT IN/OUT = 9.1 PPG - TAKE SLOW PUMP RATES BEFORE PERFORMING DISPLACEMENT _ P 3,884.00 SURF DISPLACE 9.1 PPG QUIKDRIL WITH 9.1 PPG LSND INTERMEDIATE DRILLING FLUID .750 GPM, 1700 PSI - ROTATE 60 RPM, RECIPROCATE PIPE 20 FT Printed 677/2018 3'.49'.05PM *All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Common Well Name: 04-51 AFE No Event Type: DRL- ONSHORE(DON) Start Date: 4/8/2018 End Date: 4/21/2018 X3-018XLC.(6,183,936.00) Project: PBU Site: 04 Page 11 of 22 1 Rig Name/No.: PARKER 272 Spud Daterrime: 4/10/2018 6:00:OOAM Rig Release: 4/23/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ ill _ (usft) 08:30 - 09:30 1.00 DRILL P 3,895.00 SURF DRILL UP CEMENT FROM 3854' MD TO SHOE AT 3864' MD + 20' NEW FORMATION TO 3895' MD - 450 GPM, 1250 PSI ON BOTTOM, 1087 PSI OFF BOTTOM - 50-60 RPM, 5 KFT-LBS TORQUE ON BOTTOM, 3 KFT-LBS TORQUE OFF BOTTOM - 3-5 KLBS WOB - PU = 158 KLBS, SO = 140 KLBS, ROT = 145 KLBS 09:30 - 1000 0.50 DRILL P 3,895.00 SURF CIRCULATE BOTTOMS UP IN PREPARATION FOR LOT -450 GPM, 1100 PSI - 80 RPM, 5-6 FT -LBS TORQUE 10:00 - 11:00 1.00 DRILL P 3,895.00 INT1 PERFORM LOT - MUD WEIGHT: 9.1 PPG, 3771' TVD, 3875' MD - 6.0 BELS PUMPED, 4 BBLS BACK LOT EMW =14.9 PPG 11:00 - 18:30 7.50 DRILL P 4,976.00 INTI DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 3875' MD TO 4976' MD 14637' TVD IN 7.5 HRS (144 FT/HR WITH CONNECTIONS) THROUGH THE SV3, SV2 AND SVi FORMATIONS - 750 GPM, 1980 PSI ON BOTTOM, 1960 PSI OFF BOTTOM - 120 RPM, 7 KFT-LBS TORQUE ON BOTTOM, 6 KFT-LBS TORQUE OFF BOTTOM - 18 KLBS WOB -INSTANTANEOUS ROP =200-325 FT/HR - PU = 188 KLBS, SO = 150 KLBS, ROT= 163 KLBS -SURVEY EVERY -90 FT - ECD ACTUAL = 9.8 PPG EM W - MUD WEIGHT IN/OUT = 9.1 PPG - GAS WATCH AVERAGE =55 UNITS, GAS WATCH MA_X= 190 UNITS 18:30 - 00:00 _ 5.50 T DRILL P 5,639.00 INT1 DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 4976' MD TO 5639' MD / 5150' TVD IN 5 HOURS (133 FT/HR WITH CONNECTIONS) THROUGH THE SVi AND UG4 FORMATIONS - 700 GPM, 2075 PSI ON BOTTOM, 2050 PSI OFF BOTTOM - 120 RPM, 7 KFT-LBS TORQUE ON BOTTOM, 5 KFT-LBS TORQUE OFF BOTTOM - 18 KLBS WOB -INSTANTANEOUS ROP =200 FT/HR - PU = 200 KLBS, SO = 160 KLBS, ROT = 172 KLBS - SURVEY EVERY 90 FT -ECD ACTUAL =10.34 PPG - GAS WATCH AVERAGE BACKGROUND GAS =50 UNTS, MAXIMUM =232 UNITS - MUD WEIGHT IN/OUT = 9.6 PPG - WEIGHT UP WITH 290 BBLS OF 11.3 PPG SPIKE FLUID FROM 9.1 PPG TO 9.6 PPG BEFORE THE UG4 OVER 2 CIRCULATIONS - BACK OFF ON FLOW RATE AND INSTANTANEOUS ROP FOR BETTER DIRECTIONAL CONTROL P,,,ted 617/2016 3:49:05PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 12 of 22 Common Well Name. 04-51 ARE No Event Type. DRL- ONSHORE(DON) Start Date. 4/6/2018 End Date: 4/21/2018 X3�018X1-C:(6,183,936,00) Project: PBU Site: 04 Rig Name/No.: PARKER 272 Spud Date/Time: 4/10/2018 6:00:OOAM Rig Release: 4/23/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: Active datum: 0451 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr). _ .. (usft) 4/16/2018 00:00 - 06:00 6.00 DRILL P 6,399.00 INTI DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 5639' MD TO 6399' MO / 5780' TVD IN 6 HRS (126.7 FT/HR WITH CONNECTIONS) THROUGH THE SV3, SV2 AND SV1 FORMATIONS - 700 GPM, 2190 PSI ON BOTTOM, 2150 PSI OFF BOTTOM - 120 RPM, 12 KFT-LBS TORQUE ON BOTTOM, 5 KFT-LBS TORQUE OFF BOTTOM - 22 KLBS WOB - INSTANTANEOUS ROP =180-200 FT/HR - PU = 222 KLBS, SO = 166 KLBS, ROT = 181 KLBS - SURVEY EVERY -90 FT - ECD ACTUAL = 10.39 PPG EM W - MUD WEIGHT IN/OUT = 9.6 PPG - GAS WATCH AVERAGE = 55 UNITS, GAS WATCH MAX= 284 UNITS @ 5836' MD PUMP 35 BBL HI -VIS SWEEP WITH 75% INCREASE IN CUTTINGS @ 6306' MD PUMP 35 BBL HI -VIS SWEEP WITH _ 50% INCREASE IN CUTTINGS 06 DO - 12'00 600 DRILL P 6.905.00 INT1 DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 6399' MD TO 6905' MD / 6145' TVD IN 6 HRS (84.3 FT/HR WITH CONNECTIONS) THROUGH THE UG1 FORMATION - 700 GPM, 2350 PSI ON BOTTOM, 2325 PSI OFF BOTTOM - 90-120 RPM, 13 KFT-LBS TORQUE ON BOTTOM, 8 KFT-LBS TORQUE OFF BOTTOM -10-25 KLBS WOB - INSTANTANEOUS ROP = 20- 150 FT/HR - PU = 231 KLBS, SO = 172 KLBS, ROT = 189 KLBS - SURVEY EVERY -90 FT - ECD ACTUAL= 10.49 PPG EM W - MUD WEIGHT IN/OUT = 9.6 PPG - GAS WATCH AVERAGE = 25 UNITS, GAS WATCH MAX = 150 UNITS @ 6777' MD PUMP 35 BBL HI -VIS SWEEP WITH 25% INCREASE IN CUTTINGS Printed 617/2018 3 49 05P 'All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Page 13 of 22 Common Well Name: 04-51 AFE No Event Type: DRL- ONSHORE (DON) Start Date. 4/8/2018 End Date: 4/21/2018 X3 -018X1 -C (6,183,936.00 ) Project: PBU Site: 04 Rig Name/No.: PARKER 272 Spud Date/Time'. 4/10/2018 6:00:OOAM Rig Release: 4/23/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations 12:00 - 00:00 12.00 DRILL P 7,727.00 INTI DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 6905' MD TO 7727' MD / 6900' TVD IN 12 HRS (69 FT/HR WITH CONNECTIONS) THROUGH THE UG1 AND WS FORMATIONS - 720 GPM, 2730 PSI ON BOTTOM, 2710 PSI OFFBOTTOM - 80-120 RPM, 13 KFT-LBS TORQUE ON BOTTOM, 10 KFT-LBS TORQUE OFF BOTTOM - 10.25 KLBS WOB -INSTANTANEOUS ROP =20-150 FT/HR - PU = 249 KLBS, SO = 189 KLBS, ROT = 207 KLBS - SURVEY EVERY -90 FT - ECD ACTUAL = 10.80 PPG EMW - MUD WEIGHT IN/OUT = 10.0 PPG - GAS WATCH AVERAGE = 60 UNITS, GAS WATCH MAX = 190 UNITS @ 7351' MD PUMP 35 BBL WEIGHTED SWEEP WITH A 25% INCREASE IN CUTTINGS 4/17/2018 00:00 - 06:00 6.00 DRILL P 8,296.00 INTI DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 7727' MD TO 8296' MD (569' IN 6 HRS = 95 FPH WITH CONNECTIONS) THROUGH THE CM3 FORMATION -720 GPM, 2761 PSI ON/OFF BOTTOM - 90-150 RPM, 12 KFT-LBS TORQUE ON BOTTOM, 10 KFT-LBS TORQUE OFF BOTTOM -10-25 KLBS WOB - INSTANTANEOUS ROP=80-150 FPH - PU = 257 KLBS, SO = 192 KLBS, ROT = 212 KLBS - SURVEY EVERY -90 FT -ECD ACTUAL =11.0 PPG EMW -MUD WEIGHT IN/OUT= 10.1 PPG - GAS WATCH AVERAGE = 60 UNITS, GAS WATCH MAX = 190 UNITS 06'.00 - 1200 6.00 DRILL P 8,741.00 INTI DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 8296' MD TO 8741' MD (445' IN 6 HRS = 74 FPH WITH CONNECTIONS) THROUGH THE CM3 AND CM2 FORMATIONS - 720 GPM, 2870-3230 PSI ON/OFF BOTTOM - 120-160 RPM, 12-16 KFT-LBS TORQUE ON BOTTOM, 10-11 KFT-LBS TORQUE OFF BOTTOM - 10-25 KLBS WOB - INSTANTANEOUS ROP = 50-150 FPH - PU = 262 KLBS, SO = 210 KLBS, ROT = 218 KLBS - SURVEY EVERY -90 FT -ECD ACTUAL =11.3 PPG EMW CALC=10.8 PPG EMW, HARDLINE =11.4 PPG -MUD WEIGHT IN/OUT= 10.1 PPG - GAS WATCH AVERAGE = 60 UNITS, GAS WATCH MAX = 100 UNITS Printed 6/7/2018 3:49:05PM *All depths reported in Drillers Depths' Common Well Name'. 04-51 Event Type: DRL- ONSHORE (DON) Project: PBU North America - ALASKA - BP Page 14 of 22 Operation Summary Report Start Date 4/8/2018 End Data 4/2l/2018 Site: 04 AFE No X3 -018X1 -C'. (6,183,936.00) Rig Name/No.: PARKER 272 Spud Dater ime: 4/10/2018 6:00 OOAM Rig Release: 4/23/2018 Rig Contractor. PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations . (hr) _ (usft) 12:00 - 18:00 6.00 DRILL P 9,168.00 _ INTI DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 8741' MD TO 9168' MD (427' IN 6 HRS= 71 FPH WITH CONNECTIONS) THROUGH THE CM2 AND CM1 FORMATIONS - 720 GPM, 3060-3230 PSI ON/OFF BOTTOM - 120 RPM, 12-17 KFT-LBS TORQUE ON BOTTOM, 11-12 KFT-LBS TORQUE OFF BOTTOM - 20-25 KLBS WOB - INSTANTANEOUS ROP = 70-120 FPH - PU = 290 KLBS, SO = 212 KLBS, ROT = 228 KLBS -SURVEY EVERY -90 FT - ECD ACTUAL = 11.1 PPG EMW, CALC = 10.8 PPG EMW - MUD WEIGHT IN/OUT= 10.1 PPG - GAS WATCH AVERAGE = 30-75 UNITS, GAS 1WATCH MAX =260 UNITS 18:00 - 00:00 6.00 DRILL P 9,445.00 _ INT1 DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 9168' MD TO 9445' MD (277' IN 6 HRS = 46 FPH WITH CONNECTIONS) THROUGH THE CMI FORMATION - 720 GPM, 3060-3120 PSI ON/OFF BOTTOM �- 120 RPM, 12-17 KFT-LBS TORQUE ON BOTTOM, 10-12 KFT-LBS TORQUE OFF ISI BOTTOM - 22-25 KLBS WOB - INSTANTANEOUS ROP = 20-70 FPH - PU = 289 KLBS, SO = 224 KLBS, ROT = 238 KLBS - SURVEY EVERY -90 FT - ECD ACTUAL = 11.0 PPG EMW, CALC = 10.8 PPG EMW I - WEIGHT UP SYSTEM TO 10.2 PPG WITH BLACK PRODUCT SPIKE FLUID PRIOR TO ENTERING HRZ, MUD WEIGHT IN/OUT = 10.2 PPG - GAS WATCH AVERAGE = 210-260 UNITS, GAS WATCH MAX =440 UNITS Printed 6/7/2018 3:49:05PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 15 of 22 Common Well Name. 04-51 AFE No Event Type: DRL-ONSHORE (DON) Stan Date: 4/8/2018 End Dale: 4/21/2018 X3 -018X1 -C. (6,183,936,00) Project: PBU Site: 04 Rig Name/No.: PARKER 272 Spud Date/Time: 4/10/2018 6:00:OOAM Rig Release: 4/23/2018 Rig Contractor PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ _ _ _ (usft) 4/18/2018 0000 - 0630 6.50 DRILL P 9,802.00 INT1 DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 9445' MD TO 9802' MD (357' IN 6.5 HRS = 55 FPH WITH CONNECTIONS) THROUGH THE CM1 AND HRZ FORMATIONS - 700-720 GPM, 2960-3090 PSI ON/OFF BOTTOM - 120 RPM, 13-16 KFT-LBS TORQUE ON BOTTOM, 10 KFT-LBS TORQUE OFF BOTTOM - 25 KLBS WOB - INSTANTANEOUS ROP = 50-70 FPH - PU = 289 KLBS, SO = 224 KLBS, ROT = 238 KLBS -SURVEY EVERY -90 FT - ECD ACTUAL = 11.0 PPG EM W, CALC = 10.6 PPG EMW, HARDLINE 11.4 PPG - MUD WEIGHT IN/OUT = 10.2 PPG - GAS WATCH AVERAGE = 200-300 UNITS, GAS WATCH MAX = 663 UNITS - THRZ OBSERVED AT 9575' MD, CASING POINT NO-GO/ BOTTOMS UP DEPTH(TSHU) AT 9802' MD -ZUNTROL DRILL THROUGH HRZ FOR CASING PICK WITH 25 KLBS WOB ,- PICK TOP SHUBLIKAT 9799'MD BASED ON DRILLING BREAK (INCREASE IN ROP FROM 70 FPH TO 100 FPH) 06:30 - 10:30 4.00 DRILL P 9,804.00 INT1 FINAL TRIP: CIRCULATE HOLE CLEAN WITH BOTTOMS UP - 700 GPM, 2900 PSI, 120 RPM, 10 KFT-LBS TORQUE - CONFIRM SHUBLIK IN SAMPLES AT FIRST BOTTOMS UP - DISCUSS WITH ANCHORAGE ENGINEERING AND SUBSURFACE TEAM, DECISION MADE TO DRILLAN ADDITIONAL 2' MD TO TOTAL DEPTH OF 9804' MD. SHOE WILL BE SETAT 9800' MD (V INTO SHUBLIK WITH 4' OF RATHOLE). - CONTINUE TO CIRCULATE WELL CLEAN WHILE RECIPROCATING PIPE 80' - MUD WIEGHT IN/OUT = 10.2 PPG - PU = 287 KLBS, SO = 229 KLBS AT 9804' MD Printed 617/2018 3:49:05PM 'All depths reported in Drillers Depths' North America - ALASKA - BP 17.30 - 21'.00 3.50 DRILL P 9,804.00 21:00 Operation Summary Report Common Well Name: 04-51 CASING P Event Type: DRL- ONSHORE(DON) Start Date: 4/8/2018 End Date. 4/21/2018 Project: PBU Site: 04 P Rig Name/No.: PARKER 272 Spud DateTme: 4/10/2018 6:00:00AM Rig Contractor: PARKER DRILLING CO. CASING P Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase _ (hr) _ (usft) 10:30 - 1730 7.00 DRILL P 9,804.00 INTI 17.30 - 21'.00 3.50 DRILL P 9,804.00 21:00 - 21:30 0.50 CASING P 9,804.00 21:30 - 2200 0.50 CASING P 9,804.00 22:00 22:30 0.50 CASING P 9,804.00 2230 - 0000 1.50 CASING P 9,804.00 Page 16 of 22 AFE No K3 -018X1 -C:(6,183,936.001 Description of Operations 9-7/8" INTERMEDIATE DRILLING ASSEMBLY ON ELEVATORS FROM 9804' MD TO TOP OF THE BHAAT 1102' MD - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM: STATIC - PU = 279 KLBS, SO = 220 KLBS AT 9000' MD MUD WEIGHT IN/OUT = 10.2 PPG - HOLE TAKING PROPER FILL WHILE PULLING - FROM 7870' MD TO 7580' MD: OBSERVE OVERPULLS UP TO 60 KLBS. WIPE THROUGH ONCE WITH NO FURTHER DRAG. ELECT TO FORGO WIPER TRIP FOR TIME SAVINGS AND BASED ON GOOD HOLE CONDITIONS. - MONITOR WELL FOR 10 MIN AT 10-3/4" CASING SHOE: STATIC SIMOPS: - BEGIN LAYING DOWN 5" DRILL PIPE UTILIZING OFF-LINE STAND BUILDING EQUIPMENTAFTER REACHING 10-3/4" CASING SHOE INTI FINALTRIP: LAY DOWN BHA#2, 9-7/8" INTERMEDIATE RSSASSEMBLY FROM 1102' MD TO SURFACE - MONITOR WELL FOR 10 MIN PRIOR TO PULLING BHA: STATIC - HOLE TAKING PROPER FILL WHILE PULLING - MUD WEIGHT IN/OUT = 10.2 PPG - LAY DOWN S" HWDP, JARS, AND ALL BHA COMPONENTS TO PIPE SHED. - GHOST REAMER: IN GUAGE _-BITGRADE:4-2-BT-A-X-I-C_T-TD INTI CLEAN AND CLEAR RIG FLOOR INTI SERVICEAND INSPECT PIPE SKATEAND RIG FLOOR EQUIPMENT INTI PULLAND LAY DOWN 9-15/16" ID WEAR BUSHING SIMOPS: - MOBILIZE CASING RUNNING EQUIPMENT TO RIG FLOOR INT1 RIG UP TO RUN 7", 26#, VAMTOP HC CASING - RIG UP DOYON CASING TONGS AND TORQUE TURN EQUIPMENT - RIG UP VOLANT TOOL - MAKE UP XO TO FOSV FOR 7" VAMTOP HC Printed 6/72018 3:49:05PM *All depths reported in Drillers Depths' North America - ALASKA - BP Page 17 of 22 Operation Summary Report Common Well Name'. 04-51 AFE No Event Type: DRL- ONSHORE (DON) Stan Date'. 4/8/2018 Eno Dale: 4/21/2018 X3 -018X1 -C: (6,183.936.00) Project: PBU Site'. 04 Rig Name/No.: PARKER 272 Spud Date/Time: 4/10/2018 6:00 OOAM Rig Release: 4/23/2018 Rig Contractor. PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations . (hr) (usft) . 4/19/2018 00:00 - 19:00 19.00 CASING P 9,804.00 INTI RUN 7", 26rf, L-80, VAMTOP HC CASING PER APPROVED LINER TALLY FROM SURFACE TO 10-3/4" CASING SETTING DEPTH OF 9800' MD - CHECK FLOATS: GOOD - USE JET -LUBE SEAL GUARD PIPE DOPE - TORQUE CONNECTIONS TO 11950 FT -LBS - RUN 40 FLOATING CENTRALIZERS ON JOINTS A -C, 1-37 - FILL CASING ON THE FLYAND TOP OFF EVERY 10 JTS - MUD WEIGHT IN/OUT 10.2 PPG: GOOD DISPLACEMENT -RUN IN THE HOLE AT 90 FT/MIN -CIRCULATE BOTTOMS UPAT 10-3/4" CASING -SHOE, 7 BPM - CONTINUE TO RUN IN THE HOLE FILLING ON THE FLY - BREAK CIRCULATION EVERY 10 JOINTS AT 7 BPM FOR 35 BELS - STAGE UP PUMPS AND CIRCULATE A BOTTOMS UP OVER 5 JOINTS PRIOR TO ENTERING THE HRZ:7 BPM AND 380 PSI - MUD WEIGHT IN/OUT = 10.2 PPG - MAKE UP LANDING JOINT AND LAND 7" CASING - PU 292 KLBS, SO 187 KLBS - MUD LOSSES WHILE RUNNING IN THE HOLE = 33 BELS SIMOPS: - LAY DOWN 5" DRILL PIPE UTILIZING OFF-LINE STAND BUILDING EQUIPMENT WHILE RUNNING CASING 19:00 - 21:30 2.50 CASING P 9,804.00 INT1 STAGE UP PUMPS TO CEMENTING RATE AND CONDITION MUD PRIOR TO CEMENTING LINER - STAGE UP PUMPS IN 1 BBL INCREMENTS TO FINAL CEMENTING RATE OF 7 BPM WHILE RECIPROCATING PIPE STRETCH AT SURFACE - 2 BPM: 305 PSI -4 BPM: 400 PSI - 6 BPM: 440 PSI - 7 BPM: 448 PSI ICP, 390 PSI FCP - CIRCULATE 3x BOTTOMS UP - MUD WEIGHT IN/OUT = 10.2 PPG - NO LOSSES WHILE STAGING UP PUMPS Printed 6/7/2018 3:49:05PM *All depths reported in Drillers Depths' North America - ALASKA - Blo Operation Summary Report Page 18 of 22 Common Well Name'. 04-51 AFE No Event Type: DRL- ONSHORE (DON) Start Date'. 4/8/2018 End Date: 4/21/2018 X3 -018X1 -C: (6,183,936.00 ) Project: PBU Site: 04 Rig Name/No.: PARKER 272 Spud Date/Time: 4/10/2018 6:00:OOAM Rig Release: 4/23/2018 Rig Contractor. PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Hm Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 21:30 - 00:00 2.50 CASING P 9,804.00 INTI CEMENT 7",26#/FT, L-80 VAMTOP HC LINER PER APPROVED SLB CEMENTICS MODEL - HOLD PRE JOB SAFETY MEETING WITH ALL INVOLVED PARTIES, REVIEW PRESSURE CROSSCHECK. - BLOW DOWN LINES - PERFORM PRESSURE TEST TO 350 PSI LOW/ 3500 PSI HIGH VISUAL LEAK TIGHT TEST, GOOD TEST - BATCH UPAND PUMP 40 BBLS OF 12.0 PPG MUDPUSH II SPACER (03 5 BPM, 430 PSI - DISENGAGE VOLANT TOOLAND RELEASE BOTTOM PLUG. VISUALLY INSPECT BURST DISCAFTER PUSHING DOWN WITH PLUG LAUNCHING TOOL (INTACT) - PUMP 109 BBLS, 523 SACKS OF 15.8 PPG _CLASS G C Iz M F NT, Exc E s M MME 40 OPEN HOLE (YIELD 1.11 CU.FT/SK) OULANDRIcLEASE TOP PLUG -SCHLUMBERGER KICK OUT WITH 10 BBLS i FRESH WATER '- PERFORM DISPLACEMENT WITH RIG PUMPS AND 10.2 PPG LSND PER SLB -CEMENTICS PROGRAM - 100 BBLS DISPLACED AT 10 BPM TO CATCH CEMENT: ICP 180 PSI 12% RETURN FLOW, e/Gy FCP400 PSI 22% RETURN FLOW �t - 250 BBLS DISPLACED AT 7 BP : CP 222 PSI 20% RETURN FLOW, FCP 1050 PSI 20% RETURN FLOW REDUCE RATE TO 2 BPM 12 BBL PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE 1020 PSI - OBSERVE BOTTOM PLUG LAND ON STROKES WHILE DISPLACING AT 7 BPM. BURST DISC WITH 410 PSI DIFFERENTIAL - OBSERVE TOP PLUG BUMP ON STROKESAT 3915 STROKES: 362.1 BBS LSND - PRESSURE UP TO 1550 PSI AND HOLD FOR 5 MIN. - BLEED OFF PRESSURE TO CHECK FLOATS - FLOATS HOLDING. -TOTAL DISPLACEMENT VOLUME 372.1 BBLS (MEASURED BY STROKES @ 96% PUMP EFFICIENCY) - CEMENT IN PLACE AT 23:30 ON 4/19/2018 - LEAD CEMENT REACHES 500 PSI COMPRESSIVE STRENGTH AFTER 8 HRS 52 MINS AT 08:22 ON 04/20/2018_ 4/20/2018 00:00 - 01'.30 1.50 CASING P 9,804.00 INTI RIG DOWN CMENTINGAND CASING RUNNING EQUIPMENT - BLOW DOWNAND RIG DOWN CEMENT LINE - LAY DOWN LANDING JOINT - RIG DOWN VOLANTAND BAIL EXTENSIONS - RIG DOWN DOYON CASING TONGSAND TORQUE TURN EQUIPMENT - DRAIN THE STACK Printed 6/7/2018 3:49:05PM 'All depths reported in Drillers Depths' Common Well Name: 04-51 Event Type. DRL- ONSHORE (DON) Project: PBU _ --- Rig Name/No.: PARKER 272 North America - ALASKA - BP Operation Summary Report Start Dale'. 4/8/2018 End Date: 4/21/2018 Site: 04 Spud Date/Time: 4/10/2018 6:0O:OOAM Rig Contractor: PARKER DRILLING CO. Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Hrs Task Code NPT _ (hr) 01:30 - 04:30 3.00 WHSUR P 04:30 - 06'.30 2.00 BOPSUR P 06:30 - 09:30 3.00 BOPSUR P i 09.30 - 1100 1.50 CASING P 11:00 - 1500 4.00 DRILL P Page 19 of 22 AFE No X3-018Xl-C: (6,183,936.00) Rig Release: 4/23/2018 BPUOI Total Depth Phase Descnption of Operations (usft) 9,804.00 INTI INSTALL AND TEST T' CASING PACK -OFF - MAKE UP 2 JOINTS OF 5" DRILL PIPE AND PACK -OFF RUNNING TOOL - RUN IN THE HOLE AND SET 7" PACK -OFF PER FMC REPRESENTATIVE - RUN IN LOCK DOWN SCREWS - PRESSURE TEST PACK -OFF PER FMC REPRESENTATIVE: 350_0 PSI FOR 15 MIN 9,604.00 INTI CHANGE UPPER RAMS FROM 4-1/2" x T' TO 2-7/8" x 5" VBRS - CLOSE BLIND / SHEAR RAMS - OPEN DOORS AND CHANGE OUT RAM BLOCKS SIMOPS: - CHANGE SAVER SUB TO WXT-39 FOR 4" _ DRILL STRING 9,804.00 INTI TEST UPPER RAMS (2-7/8" x 5" VBRS) TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MIN EACH WITH 4" AND 4-1/2" TEST JOINTS - BOTH TESTS PASS - PERFORM WEEKLY BOP FUNCTION TEST - INSTALL 7-1/8" ID WEAR RING SIMOPS: - RE -TEST 7" CASING PACK -OFF DUE TO INITIAL FAILURES FROM THERMAL EFFECTS. CONTACT WSUP AND ATTEMPT TO ACHIEVE PASSING TEST OFF -CRITICAL PATH. 9,804.00 INT1 PRESSURE TEST 7" CASING TO 3500 PSI FOR 30 MIN - PASSING TEST (SEE ATTACHED DOCUMENTATION), TESTAPPROVED BY WSUP - PUMP a BELS, BLEED BACK 6 BBLS - 10.7 PPG 76°F _SND MUD, TESTAGAINST BLIND RAMS - LOSE 45 PSI IN FIRST 15 MIN, 5 PSI IN SECOND 15 MIN -PERFORM PRESSURE CROSSCHECK PRIOR TO TESTING SIMOPS: - CONTINUE RE -TESTING 7" CASING PACK -OFF 9,804.00 INT1 MAKE UP 6-1/8" PRODUCTION HOLE MOTOR ASSEMBLY FROM SURFACE T0440' MD - FLOW CHECK WELL FOR 10 MIN PRIOR TO RUNNING IN HOLE, STATIC - NEW HCC 6-1/8" T406SX PDC BIT, 1.0-AKO BENT MOTOR, GR / RES / DEN / NEU / CAL - RUN JARS 347' BEHIND BIT -4" WXT-39 DRILL STRING (WIRED CAPABILITY NOT EMPLOYED) SIMOPS: -CONTINUE RE -TESTING 7" CASING PACK -OFF. OBTAIN PASSING TESTAT 14:00, RECEIVE VERBALAPPROVAL FROM WSUP. Printed 6x7/2018 3:49:05PM *All depths reported in Drillers Depths` North America - ALASKA - BP Page 20 of 22 Operation Summary Report Common Well Name: 04-51 AFE No Event Type: DRL-ONSHORE (DON) Start Date: 4/8/2018 End Date'. 4/21/2018 X3 -018X1 -C'. (6,183,936.00 ) Project. PBU Site. 04 BHAAT 440' MD TO 9686' MD Rig Name/No.: PARKER 272 Spud Date/Time: 4/10/2018 6:00:OOAM Rig Release: 4/23/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) - TRIPPING SPEED = 200 FPM Date From - To HIM Task Code NPT Total Depth Phase Description of Operations (hr) _._ Milt) 1500 - 19:30 4.50 DRILL P 9,804.00 INTI TRIP IN THE HOLE WITH 6-1/8" MOTOR Printed 6/7/2018 3 49 05P *All depths reported in Drillers Depths' DRILLING ASSEMBLY ON ELEVATORS FROM BHAAT 440' MD TO 9686' MD - FILL PIPE EVERY 20 STANDS - TRIPPING SPEED = 200 FPM - MONITOR WELL ON TRIP TANK (PROPER DISPLACEMENT) - MUD WEIGHT 10.2 PPG IN/OUT - NO ISSUES TRIPPING IN HOLE 19:30 - 20:00 0.50 DRILL P 9,804.00 INTI SLIP AND CUT 10 WRAPS (80) OF 1-3/8" LINE _ 2000 - 21:30 1.50 DRILL P 9,804.00 _DRILLING INTI - 'DRILL OUT SHOE TRACKAND CEMENT I PLUGS FROM 9710' MD TO 9790' MD (10' FROM SHOE) - WASH DOWN AND TAG SOFT CEMENT AT 9696' MD - 250-340 GPM, 2350-2700 PSI, 40 RPM, 7-9 KFT-LBS TRQ, 2-5 KLBS WOB - TAG CEMENT PLUGS ON DEPTH - 3 MINUTES TO DRILL THROUGH CEMENT PLUGS SIMOPS: - FREEZE PROTECT OUTER ANNULUS WITH 75 BBLS 9.8 PPG BRINE, 25 BBLS DIESEL CAP (500' TVD). INJECTION PRESSURE BREAKOVER AT 1050 PSI, BRINE INJECTION AT 1050 PSI, DIESEL ICP 1100 PSI, FCP 1210 PSI. 21:30 - 22:30 1.00 DRILL P 9,804.00 INTI DISPLACE WELL FROM 10.2 PPG _SND TO 8.6 PPG QUIKDRIL - 300 GPM, ICP 3040 PSI, FCP 1800 PSI - PUMP 40 BBLS 8.5 PPG SEAWATER SPACER AND 35 BBLS 8.6 PPG HI -VIS QUIKDRIL SPACER AHEAD OF FULL HOLE VOLUME OF 8.6 PPG QUIKDRIL - MONITOR BBL IN AND BBL OUT, GAIN / LOSS OVER ENTIRE DISPLACEMENT = 0 BBLS - ROTATE 25 RPM AND RECIPROCATE FULL STAND DURING DISPLACEMENT SLOW PUMP RATES @ 9790' MD WITH 8.6 PPG LSND: MP#1: 30 SPM = 520 PSI, 40 SPM = 690 PSI MP#2: LOCKED OUT FOR NOVOS _ 22:30 - 23:00 0.50 DRILL P 9,804.00 INT1 PERFORM 15 MINUTE NO -FLOW TEST AFTER I DISPLACING TO LIGHTER FLUID (PASS) 23:00 - 23:30 0.50 DRILL P 9,804.00 INTI DRILL OUT REMAINING I0'OF SHOE TRACK AND 4' OF RATHOLE FROM 9790' MD TO 9804' MD - 250 GPM, 1400-1500 PSI, 40 RPM, 4-6 KFT-LBS TRQ, 3-8 KLBS WOB - PERFORM 15 MINUTE FLOW CHECK PRIOR TO DRILLING NEW FORMATION, STATIC _ 23:30 - 00:00 0.50 DRILL P 9,824.00 INTI DRILL 20' OF NEW FORMATION FROM 9804' MD TO 9824' MD - 250 GPM, 1400-1730 PSI, 40 RPM, 9/6 KFT-LBS TRQ ON/OFF BOTTOM, 5-10 KLBS WOB Printed 6/7/2018 3 49 05P *All depths reported in Drillers Depths' North America -ALASKA - BP Operation Summary Report Page 21 of 22 Common Well Name: 04-51 AFE No Event Type', DRL- ONSHORE(DON) Start Date: 4/812018 Eno Date: 4/21/2018 X3 -018X1 -C:(6,183,93600) Project: PBU Site: 04 Rig Name/No.: PARKER 272 Spud DatelTime: 4/10/2018 6:00:OOAM Rig Release: 4/23/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: _ Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To HIM Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 4/21/2018 0000 - 01:00 1.00 DRILL P 9,824.00 INTI CIRCULATE BOTTOMS UP TO CONDITION HOLE PRIOR TO FIT - 300 GPM, 1800-1900 PSI -MWIN/OUT=8.6PPG 01:00 - 01:30 0.50 DRILL P 9,824.00 INT1 PERFORM FIT ON 7" CASING SHOE TO 10.2 - 9800' MD, 8508' TVD, 8.6 PPG MW, 750 PSI APPLIED SURFACE PRESSURE '..- 1 BBL TO PRESSURE UP, 1 BBL BLED BACK �- OBTAIN AUTHORIZATION TO PROCEED FROM ODE - SEE ATTACHED LOT CHART AND ;CALCULATOR .01:30 - 0830 7.00 DRILL P 10385.00 PROD? DIRECTIONALLY DRILL 6-1/8" PRODUCTION HOLE FROM 9824' MD TO 10385' MD (561' IN 7 HRS = 80.1 FPH WITH CONNECTIONS) THROUGH THE SHUBLIKAND IVISHAK FORMATIONS - 250 GPM, 2000-2300 PSI, 60 RPM, 7-11 KFT-LBS TORQUE ON BOTTOM, 6 KFT-LBS TORQUE OFF BOTTOM, 10-15 KLBS WOB - INSTANTANEOUS ROP = 50-200 FPH - SURVEY EVERY STAND FOR DLS < 5-1100- - MUD WEIGHT IN/OUT = 8.6 PPG - GAS WATCH AVERAGE = 30-100 UNITS, GAS WATCH MAX = 938 UNITS 08.30 - 1130 3.00 DRILL P 10,385.00 PROD1 CIRCULATE HOLE CLEAN WITH 3.5 TOTAL BOTTOMS UP 300 GPM, 1890 PSI ICP, 1800 PSI FCP, 80 RPM, 11 KFT-LBS TRO INITIAL, 10.5 KFT-LBS TRQ FINAL -MW IN/OUT= 6.6 PPG, NO LOSSES - CIRCULATE ONE SURFACE TO SURFACE 40 BBL HI -VIS SWEEP WITH NO INCREASE IN RETURNS - FLOWCHECK WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM (STATIC) 11'.30 - 16 00 4.50 DRILL P 10,385.00 PRODI PULL OUT OF THE HOLE WITH 6-1/8" MOTOR DRILLING ASSEMBLY FROM WELL TOTAL DEPTH AT 10385' MD TO BHA AT 441' MD - NO ISSUES THROUGH OPENHOLE - FLOWCHECK WELL FOR 10 MIN AT 7" SHOE AND BHA (STATIC) - PULLING SPEED OPENHOLE = 50-100 FPM, CASED HOLE = 150-250 FPM DROP GYRODATA ULTRAAND GCAAT TOOL WHILE ON BOTTOM FOR TOOLTESTING (ULTRA) AND SURVEY VERIFICATION (GCAAT) - ALLOW TO FREEFALL FOR 10 MIN, THEN PUMP DOWN AT 4.5 BPM, 1100 PSI FOR 10 MIN - PAUSE FOR 1-1/2 MIN AT (3) DEPTHS IN EACH HOLE SECTION ON TRIP OUT FOR SURVEY VERIFICATION WITH MWD TOOLS Pnnted 6/7/2018 3:49:05PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 22 of 22 Common Well Name. 04-51 AFE No Event Type: DRL-ONSHORE (DON) Start Date. 4/8/2018 End Date'. 4/21/2018 X3 -018X1 -C: (6,183,936.00 ) Project: PBU Site. 04 Rig Name/No.: PARKER 272 Spud Date/Time: 4/10/2018 6:00:OOAM Rig Release: 4/23/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: _ Active datum: 04-51 Actual RKB Q76.96usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 16:00 - 18:00 2.00 DRILL P 10,385.00 PROD1 LAYDOWN 6-1/8" MOTOR DRILLING ASSEMBLY FROM BHAAT 441' MD TO SURFACE - LAYDOWN GYRODATA TOOLS: FOUND TOOLS SEATEDAT TOP OF JARS (-181.9' HIGHER THAN EXPECTED) -BIT GRADE: 2 -1 -WT -A -X -IN -NO -TD END DON EVENTAT 18:00 ON 4/21/18. BEGIN COMPLETION EVENT Printed 6/7/2018 3:49:05PM •AII depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name. 04-51 AFE No Event Type: COM- ONSHORE (CON) Start Date: 4/21/2018 End Date: 4/23/2018 X3-018XI-C'. (2,271,994.00) Project: PBU Site: 04 Rig NameMo.: PARKER 272 Spud Date/Time: 4/10/2018 6:00:00AM Rig Release: 4/23/2018 Ria Contractor: PARKER DRILLING CO. SPUOI. Active datum: 0451 Actual RKB @76.96usft (above Mean Sea Level) Page 1 of 8 1 Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (usft) _ 4/21/2018 1800 - 1930 1.50 CASING P 10,385.00 RUNPRD RIG UP TO RUN 41/2", 12.6#, 13CR85 VAMTOP HC LINER - CLEAN AND CLEAR RIG FLOOR - MOBILIZE DOYON CASING TONGS TO RIG FLOOR - RIG UP DOYON CASING TONGS AND TORQUE TURN EQUIPMENT - MAKE UP VAMTOP HC XO TO FOSV ON RIG FLOOR - VERIFY LINER COUNT IN PIPE SHED 1930 - 21.00 1.50 CASING P 10,385.00 RUNPRD RUN 44/2",126#, 13CR85 VAMTOP PRODUCTION LINER TO 796' - FLOW CHECK WELL PRIOR TO RUNNING IN HOLE (MINOR LOSSES) -MAKE UP SHOE TRACK(BAKERLOK CONNECTIONS) AND CHECK FLOATS (PASS) - APPLY BEST -O -LIFE DOPE AND TORQUE TURN ALL VAMTOP CONNECTIONS TO OPT MU TORQUE 4440 FT -LBS. MAKE UP JOINTS WITH DOUBLE STACK TONGS. - RUNNING SPEED IN CASED HOLE = 200 FPM - VAM REPRESENTATIVE VERIFY ,TORQUE -TURN GRAPHS AND INSPECT CONNECTIONS IF NECESSARY, ALL CONNECTIONS GOOD - RUN (27) 4-1/2" X 5-3/4" CENTRALIZERS (SHOE TRACK, SPACEOUT PUP, 2 PER JOINT ON 1-9 AND 13-14). ONE FLOATING BETWEEN STOP RINGS 4' AND 10' FROM PIN, AND ONE LOCKED DOWN 13' FROM BOX. - FILL CASING ON FLY 21:00 - 22:00 T 1.00 CASING P 10,385.00 RUNPRD MAKE UP WEATHERFORD LINER HANGER/ LINER TOP PACKER ASSEMBLY AND CROSS OVER TO 4" DRILL PIPE - CHANGE FROM 41/2" TO 4" ELEVATORS - FILL PIPE AND CIRCULATE FULL LINER VOLUME - FINAL PICKUP / SLACKOFF WEIGHTS WITH LINER FULL =42142 KLBS 22:00 - 00:00 2.00 CASING P 1038500 RUNPRD RUN IN HOLE WITH 4-1/2", 12.6#, L-80, VAMTOP PRODUCTION LINER ON 4" DRILL PIPE FROM 796' MD LINER OVERALL LENGTH TO 4531' MD AT MIDNIGHT - FILL PIPE ON THE FLY AND TOP OFF EVERY 20 STANDS - RUNNING SPEED = 90 FPM - MONITOR DISPLACEMENT ON ACTIVE PIT 1, MINOR LOSSES OBSERVED WHILE RUNNING IN HOLE (FINAL VALUE TO BE REPORTED AT END OF RUN) 4/22/2018 0000 - 0230 2.50 CASING P 10,385.00 RUNPRD CONTINUE TO RUN IN THE HOLE WITH 4-1/2", 12 e#, L-80, VAMTOP PRODUCTION LINER ON 4" DRILL PIPE FROM 4531' MD TO 9761' MD (7" SHOE) - FILL PIPE ON THE FLY AND TOP OFF EVERY 20 STANDS - RUNNING SPEED = 90 FPM Printed 6/7/2018 3:49:31PM *All depths reported in Drillers Depths• North America - ALASKA - BP Page 2 of 8 Operation Summary Report Common Well Name. 04-51 AFE No Event Type: COM- ONSHORE (CON) Start Date. 4/21/2018 End Date: 4/23/2018 X3 -018X1 -C: (2,271,994,00) Project: PBU Site: 04 Rig Name/No.: PARKER 272 Spud DatelTime. 4/10/2018 6:00:OOAM Rig Release: 4/23/2018 Rig Contractor. PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.95usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) 0230 - 03:30 1.00 CASING P 10,385.00 RUNPRD CIRCULATE I.5X DIP + LINER VOLUMEAT 7" SHOE - 5 BPM, 680 PSI, NO PIPE MOVEMENT - PU = 190 KLBS, SO = 148 KLBS - MUD WEIGHT IN/OUT = 8.6 PPG . 03:30 - 04:30 1.00 CASING P 10,385.00 RUNPRD RUN IN THE HOLE WITH 4-1/2",12.6#, L-80, VAMTOP PRODUCTION LINER ON 4" DRILL PIPE IN OPEN HOLE FROM 9761' MD (7" SHOE) TO LINER SETTING DEPTH OF 10373' MD - NISSUES RUNNING IN THROUGH OPENHOLE AND NO FILL ON BOTTOM - RUNNING SPEED = 90 FPM - MAKE UP CEMENT HEAD AND SIN THE HOLE TO PLANNED SETTING DEPTH, 10373' MD - PU = 210 KLBS, SO = 154 KLBS - TOTAL LOSSES WHILE RUNNING LINER =14 BBLS SEE ATTACHED EXCEL TALLY 05:30 1.00 CASING P 10,385.00 RUNPRD 'CIRCULATE HOLE CLEAN WITH 3 TOTAL 'BOTTOMS UP - STAGE UP PUMPS OVER 30 MIN IN 1/2 BBL INCREMENTS TO 5 BPM, 1100 PSI, RECIPROCATING I5'STROKES AT 200 FPH - PICKUP WEIGHTS WITH PUMPS ON = 195 KLBS, SLACKOFF = 155 KLBS -CONDITION MUD TO 15 YIELD POINT -MW IN/OUT =8.6 PPG - NO LOSSES WHILE CIRCULATING SIMOPS: MIRU SLB CEMENTERS, HOLD PRE -JOB SAFETY MEETING FOR CEMENTING Printed 6/7/2018 3431PM 'Ag depths reported In Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: 04-51 Phase Description of Operations (usft) Event Type. COM- ONSHORE(CON) 10,38500 Start Date: 4/2112018 Project: PBU FOLLOWS: Site: 04 Rig Name/No.: PARKER 272 Spud Datelrime: 4/102018 Rig Contractor: PARKER DRILLING CO. PRESSURE CROSSCHECK, LEAKTIGHT PASS) Active datum. 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Hrs Task Code NPT - PUMP 32 BELS, 154 SACKS OF 15.8 PPG (hr) M, EXCESS VOLUME 05:30 - 09:00 3.50 CASING P End Date: 4/23/2018 AFE No 0 -018X1 -C'. (2,271,994.00) BPUOI. Page 3 of 8 Total Depth Phase Description of Operations (usft) _ 10,38500 RUNPRD CEMENT 4-1/2" PRODUCTION LINER AS FOLLOWS: - FILL LINES WITH WATER AND PRESSURE TEST TO 4800 PSI FOR 5 MINUTES (PERFORM PRESSURE CROSSCHECK, LEAKTIGHT PASS) - PUMP 30 BBLS OF 12 PPG MUDPUSH II SPACER @ 5 BPM, 600 PSI - PUMP 32 BELS, 154 SACKS OF 15.8 PPG M, EXCESS VOLUME 30%- EXTRA 10 BBLS (YIELD 1.17 CU.FT/SK) - DROP DRILL PIPE WIPER DART & DP WIPER BALL (FOR WIRED PIPE WIPE) PERFORM DISPLACEMENT WITH SLB AND 8.8 PPG BRINE: - 85 BBLS DISPLACED AT 5 BPM: ICP 200 PSI, FCP 820 PSI, CAUGHT PRESSURE AT 71 BBLS INTO DISPLACEMENT - 14 BBLS DISPLACED AT 3 BPM: ICP 475 PSI, FCP 850 PSI - LATCH UP CONFIRMED AT 99 BBLS DISPLACED, ADJUST FINAL PUMP VOLUME BASED ON LATCHUP - BUMP PLUG AFTER PUMPING 1/2 SHOE CIRCULATING PRESSURE 1100 PSI - INCREASE PRESSURE TO 500 PSI OVER - BUMP AND HOLE FOR 5 MIN. BLEED OFFAND CHECK FLOATS FOR 10 MIN (HOLDING) - RECIPROCATE PIPE 15' STROKES THROUGH JOB UNTIL FINAL 20 BBLS - NO LOSSES DURING JOB - FIELD PICK TOG BASED ON NO LOSSES, LIFT PRESSURE & CEMENT IN TOL BU RETURNS = TOLAT 9617' MD AS PLANNED - CEMENT IN PLACE AT 09:00 (500 PSI COMPRESSIVE = 19:30) -SEE ATTACHED DOCUMENTS - SIMOPS: TOP OFF CONDUCTOR X 10-3/4" SURFACE CASING ANNULUS WITH PROD LINER CEMENT. TOTAL VOLUME PUMPED = 4 BBLS (-16') Pnnted 617/2018 3:49.31 PM 'All depths reported in Drillers Depths' Common Well Name_ 04-51 Event Type. COM- ONSHORE (CON) Project: PBU North America - ALASKA - BP Operation Summary Report Start Date'. 4/21/2018 End Date: 4/23/2018 Site: 04 AFE No (2,271,994.00 ) Page 4 of 8 Rig Name/No.: PARKER 272 Spud Date/Time: 4/10/2016 6:00 OOAM Rig Release. 4/23/2018 Rig Contractor. PARKER DRILLING CO. HANGER BPUOI: Active datum: 04-51 Actual RKB @76,96usft (above Mean Sea Level) - INCREASE PRESSURE TO 3000 PSI TO Date From - To Hm Task Code NPT Total Depth Phase Description of Operations _ (hr) (usft) 0900 - 10:00 1.00 CASING P 10,385.00 RUNPRD HANG -OFF LINER PER WEATHERFORD REP 1000 - 11:30 1.50 CASING P 11:30 - 14:30 3.00 CASING P 1430 - 1530 1.00 CASING - P 1530 - 1600 0.50 WHSUR P Printed 6/72018 3:49:31 PM *All depths reported in Drillers Depths' AS FOLLOWS: - INCREASE PRESSURE TO 2000 PSI TO SET HANGER - SET DOWN TO CONFIRM HANGER SET - INCREASE PRESSURE TO 3000 PSI TO SHEAR PUSHER TOOLAND NEUTRALIZER PACKER ELEMENT (NOTE: FIRST PUSHER TOOL RUN FOR WFT IN UNITED STATES) - INCREASE PRESSURE TO 4300 PSI TO RELEASE RUNNING TOOL. NO INDICATION OF PACKER SETTING AT SURFACE - INCREASE PRESSURE TO 4800 PSI IN ATTEMPT TO FEEL PACKER SETAT SURFACE (NEGATIVE) - BLEED DOWN PRESSURE. RE -APPLY 500 PSI AND PU TO CONFIRM RUNNING TOOL IS RELEASED (JOINT CONFIRMATION THAT PUSHER TOOL MUST HAVE FUNCTIONED AND SET PACKER). NEW PICKUP WEIGHT -20 KLBS LIGHTER THAN WITH LINER - PICKUP FAR ENOUGH TO EXPOSE DOG SUB, ESTABLISH ROTATION AT 15 RPM, SET DOWN 60 KLBS ON PACKER TO PERFORM MECHANICAL SEETING MOTION AS BACKUP FOR PUSHER TOOL APPLY 600 PSI DOWN THE DRILLSTRING, PICKUP -25' TO UNSTING, OBSERVE PRESSURE DROP AND THEN RAMP UP PUMPS 10,385.00 RUNPRD DISPLACE WELL FROM 8.6 PPG MUD TO NEW 8.5 PPG SEAWATER - 620 GPM, 2700 PSI, RECIPORCATE PIPE 10' STROKES AT 1000 FPH - CIRCULATE -15 RRLS CEMENT OFF TOP nv LINER -CIRCULATE 40 BELS HI -VIS SWEEP WITH NUT PLUG (WIPE WIRED DRILL PIPE) SURFACE TO SURFACE - FLOWCHECK WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM (STATIC) - LAYDOWN CEMENT HEAD AFTER CIRCULATING 10,385.00 RUNPRD PULL OUT OF THE HOLE WITH LINER RUNNING TOOLS - PULLING SPEED = 265 FPM (RIG MAX) - HOLE TAKING PROPER DISPLACEMENT -SIMOPS: LAYDOWN 4" DRILLPIPE WITH OFFLINE EQUIPMENT 10,385.00 RUNPRD LAYDOWN WFT LINER RUNNING TOOLS. CLEAR AND CLEAN RIG FLOOR FROM TRIPPING - CONFIRM PUSHER TOOL FUNCTIONED PROPERLY DOWNHOLE 10,385.00 RUNCMP PULL WEAR BUSHING Printed 6/72018 3:49:31 PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 5 of 8 Common Weft Name. 04-51 AFE No Event Type: COM -ONSHORE (CON) Stan Date: 4 /2112 01 8 Eno Dale. 4/23/2018 X3 -018X1 -C: (2,271,994.00 ) Project: PBU Site: 04 Rig Name/No.: PARKER 272 Spud Date/Time: 4/10/2018 6:00:OOAM Rig Release: 4123/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _- (hr) (usit) 16: 00 - 1900 3.00 RUNCOM P 10,385.00 RUNCMP RIG UP TO RUN TUBING - DOYON CASING DOUBLE STACK TONGS, SLB SPOOLING UNIT FOR CONTROL LINE - ODE APPROVE PIPE TALLY, CONFIRM LAYOUT IN PIPE SHED, CONFIRM PROPER LIFTING EQUIPMENT - PREJOB SAFETY MEETING FOR RUNNING TUBING_ _ 19:00 - 110:00 5.00 P 10,385.00 RUNCMP RUN 4-1/7', 12.6#, 13CR, VAMTOP li COMPLETION TUBING FROM SURFACE TO 3977 MD AT MIDNIGHT - BAKERLOKALL CONNECTIONS BELOW THE PACKER - APPLY JET LUBE SEAL GUARD OR BEST -O -LIFE 4000 TO PREMIUM VAMTOP . THREADS (PIPE DELIVERED TO RIG WITH TWO DIFFERENT PIPE DOPES) - TORUE TURN VAMTOP CONNECTIONS TO OPT MU TRQ OF 4440 FT -LBS. VAM REP ON LOCATION TO INSPECT THREADS AND WITNESS MAKEUP - RUNNING SPEED = 90 FPM, AVERAGE 23 JOINTS PER HOUR - MW IN/OUT = 8.6 PPG (CONTINUOUS CIRCULATION OVER TOP) - SIMOPS: LAYDOWN 4" DRILLPIPE WITH OFFLINE EQUIPMENT Printed 6/7/2018 3:49:31 PM *All depths reported in Drillers Depths' Common Well Name: 04-51 Event Type: COM- ONSHORE (CON) Project: PBU North America - ALASKA - BP Page 6 of 8 Operation Summary Report Start Date: 4/21/2018 End Dale: 4/23/2018 Site: 04 Spud Date/Time: 4/10/2018 6.00:OOAM Rig Contractor: PARKER DRILLING CO. Active datum: 04-51 Actual IRKS @76.96usft (above Mean Sea Level) Date From - To His Task Code (hr) __ _ 4/23/2018 00:00 - 10:30 10.50 RUNCOM P AFE No X3 -018X1 -C (2,271,994.00) Rig Release: 4/23/2018 Printed 602018 3:49:31 PM *All depths repOrte0 in Drillers Depths' BPUO1: NPT Total Depth Phase Description of Operations (usft) 10,385.00 RUNCMP RUN 4-12", 12.6#, 13CR, VAMTOP COMPLETION TUBING FROM 3977' MD AT MIDNIGHT TO PLANNED SET DEPTH AT 9623' MD. LAND ON TUBING HANGER AND FMC REPRESENTATIVE RUN IN LOCKDOWN SCREWS. - APPLY JET LUBE SEAL GUARD OR BEST -O -LIFE 4010 TO PREMIUM VAMTOP THREADS (PIPE DELIVERED TO RIG WITH TWO DIFFERENT PIPE DOPES) - TORQUE TURN VAMTOP CONNECTIONS TO OPT MU TRQ OF 4440 FT -LBS. VAM REP ON LOCATION TO INSPECT THREADS AND WITNESS MAKEUP - RUNNING SPEED = 90 FPM, AVERAGE 23 JOINTS PER HOUR -FINAL PICKUP/SLACKOFF WEIGHTS= 144/117 KLBS (P272 TOP DRIVE + BLOCKS = 35 KLBS) - SEE ATTACHED EXCEL TALLY -RUN 1/4"(.049" WALL THICKNESS) 316SS SAFETY VALVE URFACE. PER JOINT (50 'TOTAL CLAMPS RUN +(1) STAINLESS STEEL BAND) - FMC & SLB REPS TERMINATE CONTROL LINE BY INSTALLING SWAGELOK NEEDLE VALVE ON END AND WRAPPING AROUND HGR NECK. HGR PENETRATION TESTED TO 5000 PSI FOR 15 MIN (PASS, NO CHART). 5000 PSI LOCKED IN CONTROL LINE WHEN HANGER LANDED TO HOLD SVLN PACK -OFF IN PLACE (PRESSURE BLED OFF DURING ADAPTER NIPPLE UP) - FMC REP TORQUE GLAND NUTS+ LOCKDOWN SCREWS TO 450 FT -LBS - i HOUR TO SPACEOUT, 1 HOUR TO TERMINATE CONTROL LINE, 1 HOUR TO CONFIRM HGR LANDED & TORQUE LOCKDOWN SCREWS SPACEOUT NOTES: - TAG BASE OF LINER PBR AT 29' IN ON JOINT #223 - LAYDOWN JOINTS 223, 222, AND 221 - PICKUP SPACEOUT PUPS 9.85' AND 7.84', JOINT 221, AND HGR. - RUN IN HOLE AND LAND HANGER WITH LEG AT 9623' MD (6' INTO LINER TOP Part, 5' OFF LINER TOP NO-GO) Printed 602018 3:49:31 PM *All depths repOrte0 in Drillers Depths' Common Well Name: 04-51 Event Type: COM- ONSHORE (CON) Project: PBU North America - ALASKA - BP Page 7 of 8 Operation Summary Report AFE No Start Date: 4/21/2018 End Date: 4/23/2018 X3 -018X1 -C:(2,271,994.00) Site: 04 Rig Contractor: PARKER DRILLING CO. BPUOI: Active datum. 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From -To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) (usft) 10:30 - 12:30 2.00 RUNCOM P 10,385.00 RUNCMP FREEZE PROTECT TUBING AND IA WITH 90°F 1230 - 1630 4.00 16:30 - 19:00 2.50 1900 - 2030 1.50 2030 - 2330 3.00 WHSUR P BOPSUR P -_ WHSUR P WHSUR P Printed 677/2018 3:49:31 PM "All depths reported in Drillers Depths' 6.8 PPG DIESELT02200' MD/TVD - REVERSE 75 BBLS INTO IA WITH FREEZE PROTECT PUMP; 2.5 BPM, 340 PSI ',- U -TUBE DIESEL FROM IATO TUBING FOR ONE HOUR. CONFIRM NO FLOW, NO PRESSURE AT END OF U -TUBE '- TOTAL DIESEL IN TUBING =34 BBLS, TOTAL IN IA=41 BBLS - WELL IS 220 PSI OVERBALANCED TO 7.57 PPG IVISHAK WITH STATIC COLUMN OF DIESELAND SEAWATER 10,385.00 RUNCMP FMC REPRESENTATIVE SET 4" CIW TYPE H TWO IN TUBING HANGER WITH DRY ROD - RIG TEST PRODUCTION LINER, LINER LAP, 7" CASING AND TWO FROM BELOW THROUGH IA VALVE WITH DIESEL FROM I FREEZE PROTECT PUMP TO 3500 PSI HIGH FOR 30 MIN (PASSING TEST, SEE ATTACHED CHART, OBTAIN WSUPAPPROVAL- LINER TOP PACKER AND TWO ARE BARRIERS FOR NIPPLE DOWN). - WELL MONITORED FOR 1 HOUR AS PART OF DIESEL U -TUBE PRIOR TO SETTING TWO TO CONFIRM FLUID AS BARRIER FOR NIPPLE DOWN 10,385.00 RUNCMP NIPPLE DOWN BOPE AND HIGH PRESSURE RISERS - LAY DOWN RISERS TO PIPE SHED AND SET BOP STACK BACK ON STUMP IN BOP DECK - SIMOPS: GENERAL RIG DOWN AROUND THE RIG AND LOAD (132) JOINTS 4-1/2" TUBING IN PREPARATION FOR NEXT WELL 10,385.00 RUNCMP NIPPLE UP FMC 11" X 4" TUBING HEAD ADAPTER AND DOUBLE MASTER 4" DRY HOLETREE 10,385.00 RUNCMP PRESSURE TESTADAPTERAND TREE - FMC REPRESENTATIVE TEST TUBING HEAD ADAPTER (TUBING PACK -OFF) TO 4500 PSI FOR 15 MIN; APPROVED BY WSUP - INSTALLANNULUS JEWELRY - RIG TEST DRY HOLE TREE AGAINST TOP OF TWO TO 4500 PSI (LEAK TIGHT PASS, NO CHART); APPROVED BY WSUP - POUR (2) BOTTLE OF HEAT INTO TREE FOR FREEZE PROTECTION AFTER TESTING Printed 677/2018 3:49:31 PM "All depths reported in Drillers Depths' North America -ALASKA - BP Operation Summary Report Page 8 of 8 Common Well Name. 04-51 AFE No Event Type: COM- ONSHORE (CON) Start Date: 4/21/2018 End Date. 4123/2018 X3 -018X1 -C: (2,271,994 00 ) Project PBU Site: 04 Rig Name/No.: PARKER 272 Spud DateTme: 4/10/2018 6:00:OOAM Rig Release: 4/23/2018 Rig Contractor PARKER DRILLING CO. BPUOI: Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Date From- To Hrs Task Cade NPT Total Depth Phase Description of Operations 23:30 - 00:00 0.50 WHSUR P 10,385.00 RUNCMP SECURE WELLAND CLEAN CELLAR -CLOSE ALL VALVES ON TREE AND WELLHEAD TO PRESSURE GAUGES - FINAL TWO = 0/0/0 PSI - COMPLETE HANDOVER TO WELLS GROUP PERFORMANCE SUMMARY: - $6.25MM ($1.27MM AHEAD OF $7.517MM TARGET, $2.21 MM AHEAD OF $8.456MM AFE) - 15.5 DAYS (2.6 DAYSAHEAD OF 18.1 DAY TARGET, 6.3 DAYS AHEAD OF 21.8 DAY AFE) -11.2 DAYS PER 10K (SPUD WELL TO LAYDOWN FINAL DRILLING ASSY) -0 NON-PRODUCTIVE HOURS -O HSE INCIDENTS END COMPLETION EVENTAND RELEASE PARKER RIG 272 AT 2359 HRS ON 04/23/2018 _ NEXT WELL= 11-23B Printed 6/7/2018 3:49:31 PM *All depths reported in Drillers Depths` T/I/O = TWC/0/0. (Post RWO) RD Pggyback IA, Installed blind flange, Torqued to 188 FT LBS, PT'd against IA to 2500 PSI (Pass). RD Piggyback OA, Installed blind flange, Torqued to 188 FT LBS, PT'd against 2500 PSI OA (Pass). Installed Alemite fitting to Companion OA, PT'd against VR plug 350/3500 PSI. RD Temp #97 from MV, Installed Upper tree, Torqued SSVxMV to 890 FT LBS, PT'd against TWC 350/5000 PSI (Pass) Charted and 4/28/2018 retained. Relieved by night crew. ***Job Incomplete***. T/1/0=0/0/0 POST PARKER Pulled 4" H TWC #430 @ 125" mid -window. R/D CIW Lubracator. Installed tree cap assembly and PT'D to 500 PSI. RDMO *** Job Complete*** 4/28/2018 FWHP=0/0/0 See log for details. ***WELL S/I ON ARRIVAL'*'(new well post) LRS PUMPED 250 BBLS OF SEA WATER & 86 BBLS OF DIESEL DOWN IA TAKING RETURNS UP TBG TO 04-40 FLOWLINE. PULLED ISO SLV FROM 2026' MD DROPPED BALL & ROD FROM SURFACE. LRS SET PACKER & PERFORMED MIT -T & MIT -IA 5/6/2018 ***CONT ON 5-6-18 WSR*'* T/I/0= 0/0/0. Assist slickline w/ packer setting MIT T/MIT IA (NEW WELL POST) MIT- T Test # 2 ***PASSED*** to 3729 psi. Target psi of 3500, Max applied PSI of 3850 psi. pressured up TBG with 1 bbls DSL. 1st 15 min tbg lost 30 psi, 2nd 15 min tbg lost 14 psi for a total loss of 44 psi. MIT -IA **'PASSED*** to 3769 psi. Target psi of 3500 and max applied psi of 3850. Pumped 3.09 bbls dsl to achieve test psi. 1st 15 min IA lost 40 psi. 2nd 15 min IA lost 17 psi for a total loss of 57 psi. Bled TBG and IA back together with a total of 6.5 bbls dsl. Pumped 10 bbls 60/40, followed by 245 bbls of inh SW, down IA, taking returns up tbg to production on 04-40. Pumped 86 bbls diesel down IA, taking returns up tbg to production on 04-40. U-tube for 1 hour to freeze protect TxIA. Pumped 5 bbls 60/40, followed by 34 bbls crude, and 6 bbls diesel through choke skid down hardline to 04-40 to freeze protect flowline and flush hardline. Have IGV closed and pressure flowline to 1500 psi. ***WSR 5/6/2018continued on 05/07/2018*** *'*CONT FROM 5-6-18 WSR*** PULLED BALL&ROD FROM RHC PLUG BODYAT 9607' MD PULLED SHEAR GLV FROM STA#6 & DMY GLV FROM STA#5 SET BK-LGLV IN ST#6 @ 3798' MD. SET BK-OGLV IN ST#5 @ 5784' MD. PULLED 4-1/2" RHC BODY FROM XN-NIPPLE @ 9607' MD. (intact) DRIFTED TBG W/ 20'x 3.16" DUMMY GUNS & S.BAILER TO TD @ 10,245' SLM.(no issues, sample of cement) 5/7/2018 ***WELL S/I ON DEPARTURE, DSO NOTIFIED OF WELL STATUS*** ***WSR continued from 05/06/2018**** Assist slickline w/ packer setting MIT T/MIT IA (NEW WELL POST) Bled TBG to 9 psi. Rig down. Tags hung on MV and IAC on 5/7/2018 departure. SL in control of well at departure. FWHP= 09/vact03 ***WELL S/I ON ARRIVAL*** (SLB ELINE PERFORATE) INITIAL T/I/O = 0/0/0. MIRU & PT. RIH W/ 2-7/8" X 10' PJO, 6 SPF, 60 DEG PHASE. CAL = 29', CAW = 300 LBS, MAX OD = 3.16". PERFORATE 9930'- 9940'. GOOD INDICATION OF SHOT. CORRELATE TO BAKER HUGHES COMPENSATED BULK DENSITY MEMORY LOG DATED 10 -APRIL -2018 THROUGH 21 -APRIL -2018 RDMO. WELL LEFT S/I ON DEPARTURE. FINAL T/I/O = VAC/0/0 5/13/2018 ***JOB COMPLETE 13 -MAY -2018*** by North America - ALASKA - BP PBU 04 04-51 04-51 Design: 04-51 Final Survey Report 27 April, 2018 BA ER F UGHES a GE company Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NA027' OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor 8rte —_ 04. TR -11-15 BP BAKER by Final Survey Report Site Position: Northing: 5,953,265.350 usft Latitude: E.,.a , Company: North America - ALASKA - BP Map Local Coordinate Reference: Well 04-51 Project: PBU TVD Reference: 04-51 Actual RKB @ 76.96usft (P272 Actual) Site: 04 MD Reference: 04-51 Actual RKB @ 76.96usft (P272 Actual) Well: 04-51 04-51 North Reference: True Wellbore: 04-51 – Survey Calculation Method: Minimum Curvature Design: 04-51 Database: EDM RSK - Alaska PROD - ANCPI Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NA027' OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor 8rte —_ 04. TR -11-15 Site Position: Northing: 5,953,265.350 usft Latitude: 70° 16'31S98 N From: Map Easting: 711,234.970 usft Longitude: 148" 17'27.907 W Position Uncertainty: 0.00 usft Slot Radius- 0.000 in Grid Convergence: 1.61 ° Well 04-51 – Well Position +NIS 0.00 usft Northing: 5,950,860.110 usft Latitude: 70° 16'7.601 N +E/ -W 0.00 usft Easting: 712,497.640 usft Longitude: 148' 16' 53.130 W Position Uncertainty 0.00 usft Wellhead Elevation: 29.50 usft Ground Level: 29.50 usft Wellbore 04-51 Magnate Model Name Sample Date Declination Dip Angle Field Strength l11 1°) (nT) BGGM2017 4/1/2018 17.52 80.98 57,476 Design 04-51 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 47.46 Vertical Section: Depth From (TVD) -NI-S +EI -W Direction (usft) (usft) (usft) (I 4746 0.00 0.00 235 00 4272018 4:29:21PM Page .^ COMPASS 5000.1 Build BID BP by Final Survey Report �F UgttS 0 GEcompany Company: North America - ALASKA - BP Inc Local Coordinate Reference: Well 04-51 Project: PBU TVDSS NIS TVD Reference: 04-51 Actual RKB C 76.96usft (P272 Actual) Site: 04 D1.e9 V. Sec MD Reference: 04-51 Actual RKB @ 76.96usft (P272 Actual) Well: 04-51 (usft) North Reference: True Wellbora: 04-51 (usft) (usft) Survey Calculation Method: Minimum Curvature Design: 04-51 0.00 0.00 Database: EDM R5K - Alaska PROD - ANCP7 Survey Program Date 4/27/2018 0.00 5,950,860.110 712,497.640 From To 50.00 0.24 273.70 (usft) (usft) Survey (Wellbore) Tool Name Description _ 50.00 1,089.00 GyroSS (04-51) GVD-GC-SS Gyrodata gyro single shots 141.00 1,128.26 3,811.24 OTK MWD 131/2'(04-51) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 64.04 3,892.08 9,771.12 OTK MWD 97/8"(04-51) MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal 0.23 9,815.23 10,327.78 OTK MWD 6-1/8"(04-51) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal Survey MD Inc Art(azimuth) TVD TVDSS NIS E/W Northing Easting D1.e9 V. Sec (usft) 0 CP (usft) (MR) (usft) (usft) (usft) (usft) ('1100usft) (usft) ' 4746 0.00 0.00 47.46 -29.50 0.00 0.00 5,950,860.110 712,497.640 0.00 0.00 50.00 0.24 273.70 50.00 -26.96 0.00 -0.01 5,950,860.110 712,497.635 9.45 0.00 141.00 0.05 230.00 141.00 64.04 -0.01 -0.23 5,950,860.091 712,497.415 0.23 0.19 176.00 0.47 203.20 176.00 99.04 -0.15 -0.29 5,950,859.947 712,497.350 1.22 0.33 265.00 0.47 256.31 265.00 188.04 -0.58 -0.79 5,950,859.511 712,496.864 0.47 0.98 357.00 0.78 227.74 356.99 280.03 -1.09 -1.62 5,950,858.978 712,496.049 047 1.95 450.00 0.73 240.60 449.98 373.02 -1.80 -2.61 5,950,858.234 712,495.085 0.19 3.17 542.00 1.17 219.92 541.97 465.01 -2.81 -3.72 5,950,857.195 712,494.000 0.60 4.66 636.00 0.80 205.00 635.96 559.00 -0.14 -4.61 5,950,855.839 712,493.145 0.48 6.16 729.00 0.61 186.00 728.95 651.99 -522 -4.94 5,950,854.750 712,492.850 0.32 7.04 818.00 0.73 193.40 81294 740.98 -6.25 -5.12 5,950,853.722 712,492.698 0.17 7.78 855.50 0.76 209.80 855.44 778.48 -6.69 -5.30 5,950,853.269 712,492.531 0.57 8.181 947.70 0.63 211.70 947.63 870.67 -7.66 -5.87 5,950,852.292 712,491.989 0.14 9.201 1,039.00 0.46 224.40 1,038.93 961.97 -8.36 -6.40 5,950,851.577 712,491.477 0.21 10.04 1,089.00 0.50 245.90 1,088.93 1,011.97 -8.59 -6.75 5,950,851.328 712,491.139 0.37 10.46 1,128.26 0.48 249.18 1,128.19 1,051.23 -8.72 -7.06 5,950,851.191 712,490.832 0.09 10.78 1,220.63 0.51 237.19 1,220.55 1,143.59 -9.08 -7.76 5,950,850.811 712,490.136 0.12 11.57 1,315.37 0.41 265.57 1,315.29 1,238.33 -9.34 -8.46 5,950,850.537 712,489.451 0.26 12.28 1,410.46 0.54 237.57 1,410.38 1,333.42 -9.60 -9.17 5,950,850.251 712,488.741 0.28 13.02 1,505.48 0.88 251.63 1,505.39 1,42843 -10.07 -10.24 5,950,849.750 712,487.684 0.40 14.17 412712018 4:29:21PM Page 3 COMPASS 5000.1 Build 81D BP bp Final Survey Report �gUGHES E-,, Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 04-51 Project: Pau TVD Reference: 04-51 Actual RKB @ 76.96usft (P272 Actual) Site: 04 MD Reference: 04-51 Actual RKB @ 76.96usft (P272 Actual) Well: 04-51 North Reference: True Wellbore: 04-51 Survey Calculation Method: Minimum Curvature Design: 04-51 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (waft) V) V) (usft) (usft) (usft) (usft) (usft) (usft) (*1100usft) (usft) _ 1,60071 1.15 231.03 1,600.80 1,523.64 -10.91 -11.68 5,950,848.879 712,486.272 0.47 15.82 1,695.22 0.74 184.00 1,695.10 1,618.14 -12.11 -12.46 5,950,847.652 712,485.526 0.89 17.15 1,790.04 1.26 177.49 1,789.91 1,712.95 -13.76 -12.46 5,950,846.000 712,485.576 0.56 18.10 1,883.73 0.66 188.08 1,883.58 1,806.62 -15.33 -12.49 5,950,844.437 712,485.589 0.67 19.02 1,978.93 0.64 154.26 1,978.78 1,901.82 -16.35 -12.34 5,950,843.420 712,485.772 0.40 19.48 2,074.65 0.71 127.84 2,074.49 1,997.53 -17.19 -11.63 5,950,842.596 712,486.497 0.33 19.39 2,168.78 0.67 118.17 2,168.62 2,091.66 -17.81 -10.69 5,950,842.007 712,487.461 0.13 18.97 2,264.26 0.50 256.11 2,264.09 2,187.13 -18.17 -10.60 5,950,841.647 712,487.559 1.15 1911. 2,358.44 1.62 254.62 2,358.26 2,281.30 -18.62 -12.28 5,950,841.147 712,485.890 1.19 20.74 2,454.25 2.98 246.85 2,453.99 2,377.03 -19.96 -15.86 5,950,839.715 712,482.348 1.43 24.44 2,548.88 4.37 237.63 2,548.42 2,471.46 -22.85 -21.15 5,950,836.676 712,477.140 1.61 30.43 2,644.37 6.78 23C40 2,643.45 2,566.49 -28.39 -28.57 5,950,830.928 712,469.883 2.62 39.69 2,738.69 9.08 224.48 2,736.87 2,659.91 -37.25 -38.08 5,950,821.803 712,460.632 2.56 52.56 2,833.41 10.80 228.02 2,830.16 2,753.20 18.52 -49.91 5,950,810.204 712,449.120 1.93 68.71 2,927.56 12.74 228.21 2,922.33 2,845.37 -61.34 -64.21 5,950,796.987 712,435.190 2.06 87.78 3,023.07 14.94 227.32 3,015.06 2,938.10 -76.70 -81.12 5,950,781.151 712,418.726 2.31 110.44 3,117.84 17.70 229.74 3,106.00 3,029.04 -94.30 -101.09 5,950,762.999 712,399.253 3.00 136.90 3,212.50 20.95 230.55 3,195.32 3,118.36 -114.36 -125.15 5,950,742.271 712,375.775 3.44 168.11 3,307.90 23.52 229.07 3,283.62 3,206.66 -137.67 -152.71 5,950,718.192 712,348.889 2.76 204.05 3,402.91 25.45 228.83 3,370.08 3,293.12 -163.53 -182.40 5,950,691.504 712,319.940 2.03 243.21 3,497.89 27.99 229.12 3,454.91 3,377.95 -191.56 -214.62 5,950,662.581 712,288.526 2.68 285.68 3,592.49 30.32 226.57 3,537.52 3,460.56 -222.51 -248.75 5,950,630.682 712,255.284 2.79 331.39 3,686.91 32.58 225.59 3,618.07 3,541.11 -256.68 -284.22 5,950,595.517 712,220.793 2.45 380.05 3,765.00 34.73 225.40 3,683.06 3,606.10 -287.02 -315.08 5,950,564.322 712,190.800 2.76 422.73 10 314" Surface Casing 3,781.86 35.20 225.36 3,696.88 3,619.92 -293.81 -321.96 5,950,557.344 712,184.117 2.76 432.26 3,811.24 36.17 224.80 3,720.74 3,643.76 -305.91 -334.10 5,950,544.904 712,172.330 3.48 449.14 412712018 4:29.21PM Page 4 COMPASS 5000.1 Build 81D BP by Final Survey Report �MUGHES Emmoan, Company: North America -ALASKA- BP Local Coordinate Reference: Well 04-51 Project: PBU TVD Reference: 04-51 Actual RKB 76.96usft (P272 Actual) Site: 04 MD Reference: 04-51 Actual RKB 76.96usft (P272 Actual) Well: 04-51 North Reference: True Wellbore: 04-51 Survey Calculation Method: Minimum Curvature Design: 04-51 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) _ 3,865.12 37.16 224.25 3,763.96 3,687.00 -328.85 -356.65 5,950 521 341 712,150.429 1.93 480.77 SURFACE CASING 3,892.08 37.65 223.99 3,785.38 3,708.42 -340.60 -368.05 5,950,509.259 712,139.365 1.93 496.85 3,986.75 37.98 223.66 3,860.17 3,783.21 -382.48 -408.25 5,950,466.277 712,100.373 0.41 553.80 4,082.20 38.42 225.28 3,935.18 3,858.22 -424.60 -449.60 5,950,423.011 712,060.230 1.15 611.83 4,176.99 38.51 226.62 4,009.40 3,932.44 -465.59 -491.97 5,950,380.840 712,019.030 0.88 670.05 4,272.36 38.41 227.39 4,084.08 4,007.12 -506.04 -535.36 5,950,339.183 711,976.807 0.51 728.79 4,367.22 38.15 228.37 4,158.55 4,081.59 -545.45 -578.95 5,950,298.557 711,934.352 0.70 787.10 4,462.41 38.30 229.06 4,233.33 4,156.37 -584.31 -623.20 5,950,258.464 711,891.210 0.48 845.65 4,557.19 38.14 230.04 4,307.79 4,230.83 -622.36 -667.82 5,950,219.178 711,847.683 0.66 904.02 4,651.86 38.10 231.48 4,382.27 4,305.31 -659.32 -713.08 5,950,180.951 711,803.487 0.94 962.30 4,748.07 38.30 231.38 4,457.88 4,380.92 -696.42 -759.60 5,950,142.559 711,758.038 0.22 1,021.68 4,842.49 38.09 229.24 4,532.09 4,455.13 -733.70 -804.52 5,950,104.029 711,714.188 1.42 1,079.86 4,937.46 38.05 229.87 4,606.85 4,529.89 -771.69 -849.09 5,950,064.799 711,670.714 0.41 1,138.16 5,032.00 38.46 228.11 4,681.09 4,604.13 -810.10 -893.25 5,950,025.159 711,827.654 1.23 1,196.36 5,126.99 38.51 227.06 - - `4,755.45 4,678.49 -849.97 -936.89 5,949,984.074 711,585.159 0.69 1,254.98 5,221.82 38.26 227.08 4,829.78 4,752.82 -890.07 -980.01 5,949,942.769 711,543.196 0.26 1,313.30 5,316.61 38.30 225.34 4,904.19 4,827.23 -930.71 -1,022.40 5,949,900.957 711,501.975 1.14 1,371.33 5,410.68 38.21 225.92 4,978.06 4,901.10 -971.44 -1,064.03 5,949,859.070 711,461.509 0.39 1,428.80 5,505.59 38.17 225.63 5,052.66 4,975.70 -1,012.36 -1,106.08 5,949,816.973 711,420.632 0.19 1,486.72 5,600.44 38.25 225.82 5,127.19 5,050.23 -1,053.32 -1,148.09 5,949,774.849 711,379.801 0.15 1,544.62 5,695.41 38.35 226.00 5,201.72 5,124.76 -1,094.28 -1,190.36 5,949,732.719 711,338.699 0.16 1,602.74 5,790.93 38.31 225.48 5,276.65 5,199.69 -1,135.62 -1,232.79 5,949,690.196 711,297.459 0.34 1,661.21 5,885.66 38.39 227.32 5,350.94 5,273.98 -1,176.15 -1,275.35 5,949,648.483 711,256.061 1.21 1,719.32 5,980.92 38.20 227.23 5,425.71 5,348.75 -1,216.20 -1,318.72 5,949,607.224 711,213.844 0.21 1,777.82 6,074.69 38.20 226.95 5,499.40 5,422.44 -1,255.68 -1,361.19 5,949,566.561 711,172.506 0.18 1,835.25 6,170.12 38.17 227.53 5,574.41 5,497.45 -1,295.74 -1,404.51 5,949,525.303 711,130.342 0.38 1,893.71 4272018 4:29x21 PM Page 5 COMPASS 5000.1 Build 81D BAK by Final BP Survey Report JUGHES e omna , Company: North America - ALASKA - BP Local Coorc inate Reference: Well 04-51 Project: PBU ND Reference: 04-51 Actual RKB @ 76.96usft (P272 Actual) Site: 04 MD Reference: 04-51 Actual RKB @ 76.96usft (P272 Actual) Well: 04-51 North Reference: True Wellbore: 04-51 Survey Calculation Method: Minimum Curvature Design: 04-51 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD 7VDSS NIS EIW Northing Eacting DLeg V. Sec (usft) (I (I (usft) (usft) (usft) (usft) (usft) (usft) (*1100us@) (usft) _ 6,264.95 38.22 228.21 5,648.93 5,571.97 -1,335.07 -1447.99 5,949,484.759 711,087.985 0.45 1,951.89 6,359.68 38.21 228.98 5,723.36 5,646.40 -1,373.83 -1,491.94 5,949,444.779 711,045.146 0.50 2,010.12 6,454.54 38.23 229.31 5,797.89 5,720.93 -1,412.22 -1,536.33 5,949,405.152 711,001.860 0.22 2,068.51 6,549.40 38.21 227.39 5,872.42 5,795.46 -1,451.22 -1,580.18 5,949,364.933 710,959.132 1.25 2,126.79 6,644.31 38.21 226.62 5,946.99 5,870.03 -1,491.25 -1,623.12 5,949,323.706 710,917.343 0.50 2,184.93 6,740.53 38.24 226.36 6,022.58 5,945.62 -1,532.24 -1,666.30 5,949,281.516 710,875.341 0.17 2,243.81 6,835.39 38.22 225.79 6,097.10 6,020.14 -1,572.96 -1,708.58 5,949,239.619 710,834.230 0.37 2,301.80 6,930.33 38.20 225.95 6,171.70 6,094.74 -1,813.85 -1,750.73 5,949,197.558 710,793.253 0.11 2,359.78 7,025.44 38.23 227.16 6,246.43 6,169.47 -1,654.30 -1,793.45 5,949,155.920 710,751.692 0.80 2,417.98 7,120.36 38.26 226.64 6,320.97 6,244.01 -1,69444 -1,836.36 5,949,114.587 710,709.934 0.35 2,476.15 7,215.31 38.31 224.38 6,395.51 6,318.55 -1,735.66 -1,878.32 5,949,072.200 710,669.157 1.48 2,534.16 7,310.06 38.22 224.88 6,469.90 6,392.94 -1,777.42 -1,919.54 5,949,029.296 710,629.131 0.34 2,591.88 7,404.84 38.24 227,88 6,544.36 6467.40 -1,817.87 -1,961.99 5,948 987 664 710,587.843 1.96 2,649.86 7,499.71 38.19 228.83 6,618.90 6,541.94 -1,858.87 -2,005.85 5,948,947.445 710,545.109 0.62 2,708.15 7,594.78 38.21 227.62 6,693.61 6,61665 -1,896.04 -2,049.69 5,948,907.059 710,502.391 0.79 2,766.53 7,690.79 38.22 227.07 6,769.05 6,692.09 -1,936.28 -2,093.37 5,948,865.601 710,459.866 0.35 2,825.39 7,785.84 38.28 225.87 6,843.69 6,766.73 -1,976.81 -2,136.03 5,948,823.887 710,418.368 0.78 2,883.59 1 7,880.75 38.12 225.81 6,918.28 6,841.32 -2,017.70 -2,178.14 5,948,781.827 710,377.435 0.17 2,941.53 7,975.55 38.20 226.93 6,992.82 6,915.86 -2,058.11 -2,220.53 5,948,740.235 710,336.200 0.73 2,99944 8,070.31 38.23 228.29 7,067.27 6,990.31 -2,097.63 -2,263.83 5,948,699.513 710,294.042 0.89 3,057.57 8,165.12 38.21 227.40 7,141.76 7,064.80 -2,136.99 -2,307.31 5,948,658.937 710,251.689 0.58 3,115.77 8,259.69 38.18 227.09 7,216.08 7,139.12 -2,176.69 -2,350.25 5,948,618.045 710,209.892 0.21 3,17371 8,354.48 38.12 226.81 7,290.63 7,213.67 -2,216.66 -2,393.04 5,948,576.884 710,168.251 0.19 3,231.69 8,448.93 38.17 227.34 7,364.91 7,287.95 -2,256.39 -2,435.75 5,948,535.966 710,126.675 0.35 3,28947 8,544.32 38.21 228.64 7,439.88 7,362.92 -2,295.86 -2,479.57 5,948,495.278 710,083.989 0.84 3,348.00 8,640.13 38.21 228.01 7,515.16 7,438.20 -2,335.26 -2,523.84 5,948,454.642 710,040.856 0.41 3,406.86 8,735.26 38.16 228.79 7,589.94 7,512.98 -2,374.31 -2,567.81 5,948,414.374 709,998.001 0.51 3,465.28 4272018 4: 29: 21PM Page 6 COMPASS 5000.1 Build 81D 0y by BP Final Survey Report BAgUGHES Emmpany Company: North Amence- ALASKA -BP Local Coordinate Reference: Well 04-51 Project: Pau TVD Reference: 04-51 Actual RKB @ 76.96usft (P272 Actual) Site: 04 MD Reference: 04-51 Actual RKB @ 76.96usft (P272 Actual) Well: 04-51 North Reference: True Wellbore: 04-51 Survey Calculation Method: Minimum Curvature Design: 04-51 Database: EDM R5K - Alaska PROD - ANCPt Survey MD Inc Azi(azimuth) ND TVDSS NIS E/W Northing Easting DL99 V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (1100usft) Wild') 8,830.33 38.11 229.07 7,664.72 7,587.76 -2,412.88 -2,612.07 5,948,374.572 709,954.850 0.19 3,523.66 8,925.08 37.50 226.77 7,739.58 7,662.62 -2,451.04 -2,655.85 5,948,335.190 709,912.167 0.67 3,581.41 9,020.86 35.06 231.50 7,816.79 7,739.83 -2,487.39 -2,699.32 5,948,297.831 709,869.748 3.05 3,637.86 9,115.26 31.91 233.10 7,895.51 7,818.55 -2,519.26 -2,740.50 5,948,264.616 709,829.484 3.47 3,689.87 9,209.90 28.91 235.11 7,977.13 7,900.17 -2,547.37 -2,779.28 5,948,235.423 709,791.519 3.35 3,737.76 9,305.08 26.24 237.89 8,061.49 7,984.53 -2,571.72 -2,815.98 5,948,210.048 709,755.521 3.11 3,781.79 9,399.84 25.59 241.37 8,146.73 8,069.77 -2,592.66 -2,851.69 5,948,188.107 709,720.419 1.75 3,823.05 9,494.70 25.53 242.80 8,232.30 8,155.34 -2,611.82 .2,887.85 5,948,167.935 709,684.813 0.65 3,863.67 9,589.43 25.49 243.86 8,317.80 8,240.84 -2,630.13 -2,924.31 5,948,148.603 709,648.892 0.48 3,904.03 9,684.33 25.52 245.77 8,403.45 8,326.49 -2,647.52 -2,961.28 5,948,130.180 709,612.425 0.87 3,944.29 9,771.12 25.37 246.16 8,481.62 8,404.86 -2,662.70 -2,995.33 5,948,114.038 709,578.813 0.26 3,980.90 9,799.96 24.98 246.23 8,507.92 8,430.96 -2,667.66 -3,006.55 5,948,108.772 709,567.734 1.36 3,992.93 INTERMEDIATE CASING 1 9,800.00 24.98 246.23 8,507.96 8,431.00 -2,667.86 -3,006.57 5,948,108.764 709,567.719 1.36 3,992.95 7" Production Casing 9,815.23 24.77 246.27 - --- 1,521.78 8,444.82 -2,670.24 •3,012.44 5,948,108.020 709,561.931 1.36 3,999.23 9,908.71 26.84 245.55 8,605.93 8,528.97 -2,686.86 -3,049.58 5,948,088.362 709,525.274 2.24 4,039.19 10,002.20 27.76 243.98 8,688.01 8,612.05 -2,705.15 -3,088.36 5,948,068.988 709,487.028 1.25 4,08144 10,095.07 28.06 24448 8,771.08 8,694.12 -2,724.05 -3,127.51 5,948,048.993 709,448.432 0.41 4,124.35 10,188.86 28.17 245.11 8,853.80 8,776.84 -2,742.87 -3,167.50 5,948,029.051 709,408.992 0.34 4,167.91 10,281.00 27.30 244.90 8,935.35 8,858.39 -2,760.98 -3,206.36 5,948,009.845 709,370.856 0.95 4,210.13 10,327.78 27.52 244.78 8,976.88 8,899.92 -2,770.14 -3,225.85 5,948,000.143 709,351.431 0.48 4,23135 10,38500 27.52 244.78 9,027.63 8,950.87 -2,781.41 -3,249.77 5,947,988.207 709,327.841 0.00 4,257.41 Projection to TD - 4 1/2" Production Liner 4272016 4:29:21PM Page 7 COMPASS 5000.1 Build 61D 42712018 4:29:21PM Page 8 COMPASS 5000.1 Build 81D BP B bp Final Survey Report JUG E.,, Company: North America -ALASKA -BP Local Co-ordinate Reference: Well 04-51 Project: PBU TVD Reference: 04-51 Actual RKB @ 76.96usft (P272 Actual) Site: 04 MD Reference: 04-51 Actual RKB @ 76.96usft (P272 Actual) Well: 04-51 North Reference: True Wellbore: 04-51 Survey Calculation Method Minimum Curvature Design: 04-51 Database: EDM R5K - Alaska PROD - ANCP7 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 9,800.00 8,507.95 7" Production Casing 7.000 9.875 10,385.00 9,027.63 41/2" Production Liner 4.500 6.125 3,765.00 3,683.06 10 3/4" Surface Casing 10.750 13.500 3,865.12 3,763.96 SURFACE CASING 10.750 13.500 9,799.96 8,507.92 INTERMEDIATE CASING 1 7.000 9.875 Design Annotations Measured Vertical Local coordinates Depth Depth +N/ -S •FJ -W (usft) (usft) (usft) (usft) Comment 10,385.00 9,027.63 -2,781.41 -3,249.77 Projection to TD Checked By: Approved By: Date: 42712018 4:29:21PM Page 8 COMPASS 5000.1 Build 81D WELLBORE DETAILS: 04-51 PEFFI�Cflxrpu4olxlx o4-51 cvv4rva1MM1:11'aweua WMIC4s4 Tueewan VMG DVD�PeIa'ew b51Mul MB®169fi�e1 SPR}Ativ4 61aEp Paren[W¢IlOoro: NO w¢IlbOre 0e19 is Heil �1d"N91 Htlaeim. 91M'�O.L@10 WE1 /f1 RR MUMoyngq. wlautte®rs9sutrynrzaa UGNES eon MD:N48 Cal[udan MOro]. Mnmun CuwWe GEmmp3rty Project: PBU0"""n $ile:Mq.�rm 04_5 WPI: 001 We 004 by Wellbore: Design: 0451 (0451/0151) Gegn 9r36n ^n"e°BO� m°a®i Post Drilling Easting(200usf An) O O O O O O O O O O O O J+ + + + + + + + i r J J J at 0 9 0 0 r0 O O O p O > q p p O O O O m O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 5951400 04-40/04-40 ny 05/04-0 05/04-05 �1 04-02/0402 5951400 n0 04-0,S/04PO`, SOO 5951200 04 02104-02A m� 0 4- 6PB1 3951200 00 °0 4 5951000 rO p8°5951000 5950800 4Sp ) bO y�j -5950800 5950000 B° ' p 5950fi00 5950400 d`SS PO� Op -5950400 5950200 60004 °OO q3. Pyh� '5950200 5950000 4 yo°° 04-04/04-04A - ;5 04-04/04-04 j 6649800: ss� s1°° `rd°O y9°° s94s�00 � 5949600. 0p0° :59490 O S° 46pO 00 ry 5949400 6° 45 600 °y°° 594940D o C 5949200 °O d°° �541920p O rio 5919000 04-51 ACTUAL ° sO 0 0 �op0 59awoo y z SS S°O SSpOp 5018BW 0 A 5948600 °0 ° 0 5948600 'OOO 8p0 �5941Y21D 5948400 �O >S° '00`100 6500 ell ;591&00 D 5948200 d° d° '. 5998200 0451/0451 S d° °0 6 6 0 00 Op �59/E8W ° 04-01/04-01 5947800 � 0n° :5947800 0 5947600. b° � -03/04-03 00 0 6600 6SOO 5S47600 5947400. SS j5947400 04-47/04-47 SO 04.45/04.45 04-06/04-06 _.__._... V V V V V J J V J_ V 0 m m 0 m N P 0 N N W O O OO O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Easting(200 ustiln) p Post Drillir North America - ALASKA - BP PBU 04 04-51 04-51 04-51 AOGCC Post Drilling Offset Report 27 April, 2018 BAF00 IGHES BAT GE company NES Company: North America - ALASKA - BP Project: PBU Reference Site: 04 Site Error: 0.00usft Reference Well: 04-51 Well Error: 0.00usft Reference Wellbore 04-51 Reference Design: 04-51 I BF BA' �(ER Anticollision Report UGHFS GEcomparry Local Coordinate Reference: Well 04-51 TVD Reference: 04-51 Actual RKB @ 76.96usft (P272 Actual) MD Reference: 04-51 Actual RKB @ 76.96usft (P272 Actual) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP1 Offset TVD Reference: Offset Datum teference 04-51 'ilter type: NO GLOBAL FILTER. Using user defined selection 8 filtering criteria nterpolation Method: MD Interval 25.00usft Error Model: ISCWSA )epth Range: Unlimited Scan Method: Tray. Cylinder North tesults Limited by: Maximum center -center distance of 1,234.37usft Error Surfs": Elliptical Conic Survey Program Date 4/27/2018 From To (usft) (usft) Survey (Wellbore) Tool Name 50.00 1,089.00 GyroSS (04-51) GYD-GCSS 1,128.26 3,811.24 OTK MWD 131/7'(04-51) MWD+IFR+MS-WOCA 3,892.08 9,771.12 OTK MWD 97/8"(04-51) MWD+IFR+MS-WOCA 9,815.23 10,327.78 OTK MWD 6-1/8"(04-51) MWD+IFR+MS-WOCA Description Gyrodata gym single shots MWD + IFR + Multi Station W/O Crustal MWD + IFR + Multi Station W/O Crustal MWD + IFR + Multi Station W/O Crustal Summary Reference Offset Centre to No -Go Allovvable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wetibore - Design (usft) (usft) (usft) (usft) 04 04-01 - 04-01 - 04-01 2,934.39 2,900.00 317.46 46.66 271.00 Pass- Major Risk 04 -01 -04 -01A -04-01A 2,934.39 2,900.00 317.46 46.39 271.26 Pass - Major Risk 04-01 - 04-01 A- Plan #3 2,934.39 2,900.00 317.46 46.39 271.26 Pass- Major Risk 04-02-04-02-04-02 3,062.90 3,050.00 186.38 43.07 144.28 Pass - Major Risk 04-02 - 04-02A- 04-02A 3,071.63 3,050.00 186.54 43.26 144.25 Pass - Major Risk 04-03 - 04-03 - 0403 2,763.87 2,750.00 86.89 36.55 50.37 Pass - Major Risk 04-04 - 04-04 - 0404 2,461.18 2,450.00 96.51 33.82 62.76 Pass - Major Risk 04-04 - 04-04A- 04-04A 2,461.18 2,450.00 96.51 33.82 62.76 Pass - Major Risk 04-06-04-05-04-05 1,733.53 1,725.00 276.64 25.13 251.51 Pass - Major Risk 04 -05 -04 -05A -04-05A 1,719.65 1,700.00 276.46 24.95 251.51 Pass - Major Risk 04-05 - 04-05PB1 - 04-05PB1 1,733.53 1,725.00 276.64 25.13 251.51 Pass - Major Risk 04-06 - 0406 - 04-06 3,573.97 3,675.00 111.20 61.99 50.42 Pass - Major Risk 04-06-04-06PB1-04-06PB1 2,504.85 2,500.00 403.66 46.84 356.84 Pass - Major Risk 0440 - 04-40 - 0440 2,996.28 2,975.00 218.33 41.11 177.24 Pass - Major Risk 04-42-0442-04-42 1,587.98 1,575.00 454.54 25.13 429.41 Pass - Major Risk 04-45-04-45-04-45 2,762.46 2,800.00 327.58 49.05 278.87 Pass - Major Risk 0447 - 04-47 - 0447 6,576.36 7,525.00 312.86 150.75 163.21 Pass - Major Risk 4/27/20184:00: 50PM A (0) (e20/3 C C COMPASS 5000.1 Build 81D BP BA, �(ER bp Anticollision Report UGHES GEwmpairy Company: North America - ALASKA - BP Project: PBU Reference Site: D4 Site Error: 0.00usft Reference Well: 04-51 Well Error: 0,00usft Reference Wellbore 04-51 Reference Design: 04-51 Local CO -ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 04-51 04-51 Actual RKB 76.96usft (P272 Actual) 04-51 Actual RKB 76.96usft (P272 Actual) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to 04-51 Actual RKB @ 76.96usft Coordinates are relative to. 04-51 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27.OGP-Usa AK Central Meridian is 150° 0'0,000 W' Grid Convergence at Surface is: 1.62° 4272018 4:00.50PM // ) I // 1115he 3 off // // — COMPASS 50001 Build 81D Printed 6/11/2018 10:58:54AM North America - ALASKA - BP Pape 101`3 Cementing Repoli Common Well Name. 04-51 / OH Report no.: 1 Report date. 4/14/2018 Project Pi _ Site: 04 _-- - - - - - Spud OateTme: 4/10/1018 -- _-- Event Type: DRL-ONSHORE (DON) Start Date: 4/8/2018 End Date: 421/2018 AFE No.: Contractor PARKER DRILLING CO. Rip NarneMo.: PARKER 272 Rig Release: 4232018 X3 -018X1 -C: (8,183,936.00) BPUOI: Active datum: 0451 Actual RKB @76.96usft (above Mean Sea Level) eemral Inbrmetlon Job type: Primary Cement job start date/time: 4/13/2018 4:OOPM Job end dateltime. 4/13/2018 9 30P Cement Company: SCHLUMBERGER Cementer: DANIEL SETTLE Cemented String: SURFACE CASING String Size: 10.750 (in) String Set Ti 3,865.12 (usft) Hole Size: 13.500 (in) Pipe Movement Pipe Movement: RECIPROCATING Rotating Time (Start -End): RPM. Rotating Torque (Init/avg/max): (ft -lb!) Reciprocating Time (Start -End): Recip Drag Up/Doom. - (kip) SPM: Stroke Length: Fluid Mama: SPACER Fluids (1 of 3) Slurry Type: SPACER Purpose: SPACER Class: Description: MUD PUSH II Density: 10.00 (ppg) Yield: Mix Water Ratio: Excess: Mix Method: Sacks Used: Water Volume: Excess Slurry Volume: 0.0 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol In Well: Slurry Volume: 100.0 (bbl) Excess Measured From: Mud Type: Density: 9.10 (ppg) PV: 13.00 (cp) YP: 44.000 (Ibf/1001 Viscosity: 0.00 (c/qt) Gels 10 Sac: 38.000 (I0100ft-) Gels 10 Min: 47.000 (Ibf/10082) FIUM MMM: CEMENT Fluids (2 of 3) Slurry Type: CEMENT Purpose: PRIMARY Class: LITE Description: LEAD SLURRY Density: 11.00 (1 Yield: 1.9100 (fP/sk) Mix Water Raft 8.880 (gagskg4) Excess: 350.00(%) Mix Method: ON -THE -FLY Sacks Used: 1,910.60 (941b sacks) Water Volume: 313.0 (bbl) Excess Slurry Volume: 505.5 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 850.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 9.10 (ppg) PV: 13.00 (cp) YP: 44.000 (Ibf/100ft-) Viscosity: 0.00 (stilt) Gels 10 Sec: 38.000 (Ibf/100ftl Gels 10 Min: 47.000 (Ibf/100ft-) AddlBves Name Type Amount Units Concentration Unit 0047 ANTIFOAMAGENT 0.D50 GAL/SX 0185 DISPERSANT 0.600 GAUSX D177 RETARDER 0.400 GAUSX Printed 6/11/2018 10:58:54AM Page 2 of 3 North America - ALASKA - BP Cementing Report RePod no t Report date: 4/1412018 Common Well Name: 04-51 / OH _—..._ —. - _ _ _. — _.. --t —_ -__ Project: PBU Site: 04 SPutl Date/time: b/10/2018 Event Type: DRL- ONSHORE (DON) Start Date: 4/8/2018 End Dale: 4/21/2018 AFE No Contractor: PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rig Release: 4/23/2018 X3018X1 C (6,183,836.00) BPUOI: Active datum'. 04-51 Actual RKB @76.96usft (above Mean Sea Level) Fluid Teats Thick tlme Thick Free water Free water Fluid loss Fluid loss Fluid loss Camp Comp Camp Comp Camp Strength Comp Strength (hr) temp. (%) temp. (ce/30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) (°F) ("F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) min(psi) (°F) (min) 7.73 0.00 80.00 F1uld Name: CEMENT Fluids (3 of 3) Slurry Type. CEMENT Purpose: PRIMARY Class: G -CLASS Description: TAIL SLURRY Density: 15.80 (ppg) Yield: 1.1700 (Wisk) Mix Water Ratio: Excess: 40,00(%) Mix Method. Sachs Used: 259.20 (941b sacks) Water Volume: 0.0 (bbl) Excess Slurry Volume: 15.4 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 54.0 (bbl) Excess Measured From: Mud Type: Density: 9.10 (ppg) PV: 13.00 (cp) YP: 44.000 (Ibf/100ft) Viscosity: 0.00 (s/qt) Gels 10 Sec: 38.000 (Ibf/1001tj Gels 10 Min: 47.000 (Ibf/100fN) Additives Name Type Amount Units Concentnation Unit Dg47 ANTIFOAM AGENT 0.500 GAL/SX D065 DISPERSANT 0.300 %BWOC D167 FLUID LOSS 0.400 %BWOC D186 ACCELERATOR 0.100 GAL/SX Fluid Tomb Thick time Thick Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp SUength Comp Strength (hr) temp. (%) temp. (cU30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) (°F) (°F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) min psi -F min 4.38 0.00 1 80.00 86.0 68.00 1,000.00 Panted 6/11/2018 10:58:54AM Printed 6/11/2018 10:55:54AM Page 3 of 3 North America - ALASKA- BP Cementing Report Gammon Well Name: 04-51 / OH l Report no.: 1 Report date : 4/14/2018 project PBU Site'. 04 Spud DateRime: 4/10/2018 _ Event Type_ DRL- ONSHORE (DON) j Sfan Dete 4/8/2018 End Date: 421/2018 AFE No Contractor'. PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rig Release: 4/232018 X3-018X1-C: (6,183,936 00 ) BPUOI Active datum: 04-51 Actual ftK8 @78.98ustt (above Mean Sea Level) stag" Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom plus Pressure Floet Pressure Retums Circulate Girt Val to Total Annular no. (usft) (usft) Rate Press. Plug Plug Bumped Bumped Haid Hem Prior Surface Mud Lost Flow (Bpm) (psi) (hr) (bbl) (bbl) Atter (psi) (min) 1 RIMARYCEMENT 0.00 3,865.00 Y V y Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Sluny Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH cim. Bh static Pumped Disp. Rate TMD TMD PmP date/time job Used temp. temp. (bbl) Rate (bbymin) (usft) (usft) (scf) bbl/min Tests Casing Test Shoe Test Liner Top Teat Test Pressure: 3,500.00 (psi) FIT/LOT: (ppg) Liner Overlap: (usft) Time: 30 (min) Tool: N Positive Test: (ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length. (usft) Negative Test: (ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cm! Found on Tool: N Log/Survey Evaluation Interpretation Summery CBL Run'. N Cement Top: (usft) Under Pressure'. (psi) How Determined: Bond Quality TOC Sufficient: N CET Run'. N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey. N Remedial Cement Required: N Him Prior to Log'. (hr) How Determined: Printed 6/11/2018 10:55:54AM Printed 6/11/2018 10:58:52AM Page 1 of 2 North America - ALASKA - BP Cementing Report Common Well Name: 04-511 OH Report no.: 2 Report date: 4/191201 B Project: PBU Site: 04 Spud Daterrime: 4/102018 Event Type: DRL-ONSHORE (DON) Start Date: 4/8/2018 End Date: 4/212018 AFE Ni Contractor PARKER DRILLING CO. Rig NanWNi PARKER 272 Rig Release: 4232018 X3 -018X7 -C: (8,153,936,00) BPUOI. Active datum: 04-51 Actual RKB @76.96usft (above Mean Sea Level) Genial Info rmSir tlon Job type: Primary Cement job start date/time: 4/19/2018 9:30PM Job end date/time: 4/192018 11:59PM Cement Company: SCHLUMBERGER Cementer: DANIEL SETTLE Cemented String: INTERMEDIATE CASING 1 String Size: 7.000 (in) String Set TMD: 9,799.96 (usft) Hole Size: 9.875 (in) Pipe Movement Pipe Movement: Rotating Time (Start -End): RPM. Rotating Torque (initravg/max): (fl-Ibr) Reciprocating Time (Start -End): Recip Drag Up/Daum: - (kip) SPM: Stroke Length: F7uld Mama: VADHR Fluids (1 of 2) Slurry Type: SPACER Purpose: SPACER Class: Description: MUD PUSH II Density: 12.00 (ppg) Yield. Mix Water Ratio: Excess: Mix Method: BATCH Sacks Used: Water Volume: Excess Slurry Volume: 0.0 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 40.0 (bbl) Excess Measured From: Mud Type: Density: 10.25 (ppg) PV: 12.00 (cp) YP: 18.000 (IM/10i Viscosity: 43.00 (s/qt) Gels 10 Sec: 6.000 (I0100f i) Gels 10 Min: 9 000 (lbf/100f12) Fluid Name: CEMENT Fluids (2 of 2) Sluny Type: CEMENT Purpose: PRIMARY Class: G -CLASS Descnption: LEAD SLURRY Density: 15.60 (ppg) Yield: 1.1700 (ft -i Mix Water Ratio: Excess: 40.00(%) Mix Method: ON -THE -FLY Sacks Used: 523.00 (9411b sacks) Water Volume: 0.0 (bbl) Excess Slurry Volume: 31.1 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 109.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 10.25 (ppg) PV: 12.00 (cp) YP: 18.000 (Ibf/100ft2) Viscosity: 43.00 (s/qt) Gels 10 Sec: 6.000 (Ibf/100W) Gels 10 Min'. 9.000 (Ibf/100ft2) Addifthi Name Type Amount Units Concentration Unit D047 ANTIFOAM AGENT 0.100 GAUSX D206 ANTIFOAMAGENT 0.100 GAUSX D065 DISPERSANT 0.450 %BWOC D167 FLUID LOSS 0.100 %BWOC D600 G GAS -BLOCK 2.000 GAUSX Printed 6/11/2018 10:58:52AM Printed 6/11/2018 10:58:52AM Page 2 of 2 North America - ALASKA - BP Cementing Report Report no.: 2 �epon tlate'. 4/19/2018 Common Well Name: 04-51 / OH ProlePBII d Sile: 04 - — _ _ _ _ SPud Date/ e: 4/10/2018 Event Type: DRL-ONSHORE(DON) Stan Dele: 4/812018 End Date: 4/2V201g AFE No.: Contractor: PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rig Release: 4/ 23/2018 — _ —... X3-018X1-C (6,183,938.00) _ BPUOI: -Active __.. e datum : 0451 Actual RKB @76.96usft (above Mean Sea Level) Fluid Taft Thick time Thick Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp CampComp Comp Strength Comp Strength (hr) temp. (`yo) temp. (cc(30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (•F) (^F) (°F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) (min) (psi) °F) (min) 3.92 0.00 80.00 22.0 116.00 1,000.00 Sbgest Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom Plug Pressure Float Pressure Retums Circulate Cmt Vol to Total Annular no. (usft) (usft) Rate Press. Plug Plug gomped dumped Ham Hem Phr) Surtace Mud Lost Flow (9Pm) (Psi) (ps9 (rem (hr) (bbl) (bbl) After 1 PRIMARYCEMENT 7,512.00 9,800.00 y y y y Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Sluny Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumpetl Disp, Rate TMD TMD Pmp date/time job Used temp. temp. (bbl) Rate (bbl/min) (usft) (usft) (sco bbl/min Tab Casing Test Shoe Teat Liner Top Teat Test Pressure: 3,500.00 (psi) FIT/LOT: (Ppg) Liner Overlap: (usft) Time: 30 (min) Tool: N Positive Test: (Ppg) Positive Test Tool'. N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (Ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined'. Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey. N Remedial Cement Required'. N Him Prior to Log: (hr) How Determined: Printed 6/11/2018 10:58:52AM Printed 6/11/2018 10'.59:34AM Page 1 of3 North America - ALASKA - BP Cementing Report Common Well Name: 04-51 / OH — — --— Report no 3 Report date: 4/222010 Project: PBU Site: 04 - _ Spud DateJTime: 4/10/2018 Event Type: COM- ONSHORE (CON) Start Dete: 4272018 End Date: 4232018 AFE No.: Contractor PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rig Release: 4232018 XS 018XI-C: (2,271,994.00) BPUOI: Active datum: 0451 Actual RKB 076.96usfl (above Mean Sea Level) General Information Job type. Primary Cement job start date/time: 4/22/2018 5:30AM Job end date/time: 4/22/2018 9.00AM Cement Company: SCHLUMBERGER Cementer: DANIEL SETTLE Cemented String. PRODUCTION LINER 1 String Size: 4.500 (in) String Set TMD: 10,373.00 (usft) Hole Size: 6.125 (in) Pipe Movement Pipe Movement: RECIPROCATING Rotating Time (Start-End): RPM: Rotating Torque (initlavg/max): (ft-Ibf) Reciprocating Time (Start-End): Recip Drag Up/Dovm: - (kip) SPM'. Stroke Length. Fhdd Nun: SPACER Fluids (1 of 2) Slurry Type: SPACER Purpose'. SPACER Class: Description: MUD PUSH II Density'. 12.00 (ppg) Yield: Mix Water Ratio: Excess: Mix Method: BATCH Sacks Used: Water Volume: Excess Slurry Volume: 0.0 (bb0 Density Measured by. DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 30.0 (bbl) Excess Measured From. Mud Type: Density: 8.40 (plog) PV: 0.00 (cp) YP: 0.000 (I1of/1001t) Viscosity'. 0.00 (srgt) Gels 10 Sec: 0.000 (IbY100ft) Gels 10 Min: 0.000 (Ibf/100" Fluid Name: CEMENT Fluids (2 of 2) Slurry Type. CEMENT Purpose'. PRIMARY Class: G-CLASS Description: TAIL SLURRY Density: 15.80 (ppg) Yield: 1.1700 (IN/sk) Mix Water Ratio: Excess: 30.00(%) Mix Method: BATCH Sacks Used: 153.80 (941b sacks) Water Volume: 0.0 (bbl) Excess Slurry Volume: 7.4 (bbl) Density Measured by: Other Volume: Total Vol in Well: Slurry Volume: 32.0 (bbl) Excess Measured Fmm: Mud Type: Density: 8.40 (ppg) PV: 0.00 (cp) YP: 0.000 (Ibf/100ttI) Viscosity: 0.00 (s/qt) Gels 10 Sec: 0.000 (Ibf/1 DOfli) Gels 10 Min: 0.000 (Ibf/100ft) Printed 6/11/2018 10'.59:34AM Printed 6/11/2018 10:59:34AM Page 2 of 3 North America - ALASKA - BP Cementing Report --- — Re rt no 3 po Report date: 4/22/2018 Common Well Name. 04-51 / OH - - - - -- - - - Project: PBU Site'. 04 Spud DateTme: 4/1012010 _ AFE No.: Event Type'. COM- ONSHORE (CON) Start Date: 4/21/2018 End Date: 4/23/2018 Contractor. PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rig Release: 4/23/2018 — X3-018X1-C: (2,271,994.00) -- - — - - _- Active datum: 0451 Actual IRKS @76.98usft (above Mean Sea Level) BPUOI. AddKlvas Name Type Amount Units Concentration Unit 0.100 GAUSX D047 ANTIFOAMAGENT 0.100 GAUSX D206 ANTIFOAMAGENT 0.800 %BWOC D065 DISPERSANT 0.100 % BWOC D167 FLUID LOSS 2.000 GAUSX D800 G GAS-BLOCK 0.010 GAUSX D177 RETARDER Fluid Taab Thick time Thick Free water Free water Fluid loss Fluid loss Fluid loss Comp Como Comp Comp Comp Strength Comp Strength (hr) temp. (%) temp. (cd30min) temp. press. Strength Strength Strength Strength Time�sllre 2 Temperature 2 (°F) (`F) (°F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) min (psi) (min) 5.15 90.00 0.00 80.00 24.0 143.00 1,000.00 Stages Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom Plug Pressure Floar Prassvre Raiuma Circulate Cm[ Vol to Total Annular (usR) (usR) Rate Press. Plug Plug Bumped 8umpad nam Haid Pdor Surtace Mud Lost Flow no. (gpm) (psi) (psh (min) (hr) (bbl) (bbl) After 1 PRIMARY CEMENT 9,617.00 10,171001Y Y Y Y Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumped Disp. Rate TMD Ti,D Pmp date/time job Used temp. temp. (bbl) Rate (bbl/min) (usR) (usR) (� bbUmin) Printed 6/11/2018 10:59:34AM Pnmed 6/11/2018 10:59:34AM Page 3 of 3 North America - ALASKA - BP Cementing Report Common Well Name: 04-511 OH Report no.: 3 Report date: 4/22/2018 ProjeG: PBU Site: 04 Spud DateTme: 4/1012018 Event Type: COM- ONSHORE (CON) Start Date: 42112018 End Date: 423/2018 AFE No.: Contractor PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rig Relaase: 4232018 X3-018X1-C: (2,271,994,00) BPUOI: Active datum: 0451 Actual RKB @76.96usft (above Mean Sea Level) Tants Casing Teat Shoe Test Liner Top Teat Test Pressure: (psi) FIT/LOT: (Ppg) Liner Overlap: (usft) Time: (min) Tod: N Positive Test: (Ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (Ppg) Negative Test Tool N - Hours Before Start: (hr) Time before test: (hr) Coot Found on Tod: N Log/Survey Evaluation Interprefetlon Summary CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Tamp Survey: N Remedial Cement Required: N Him Prior to Log: (hr) How Determined: Pnmed 6/11/2018 10:59:34AM BAF UGHES 0PRINT DISTRIBUTION LIST a GE company COMPANY BP Exploration Alaska Inc. WELL NAME 04-51 FIELD Prudhoe Bay Unit 29315 lse sign and return one copy of this transmittal form to: Exploration (Alaska) Inc. rotechnical Data Center, LR2-1 I E. Benson Blvd. Anchorage, Alaska 99508 or data. COUNTY PRUDHOE BAY LOG TYPE GR-RES-DEN-NEU BHI DISTRICT Alaska (las, dlis, PDF, META, SURVEY REPORT LOGS LOG DATE April 21, 2018 AUTHORIZED BY Paul Canizares # OF PRINTS EMAIL Paul. Can izares@bhoe.COm TODAYS DATE June 6, 2018 JUN 0 g 2019 Revision A0 Q C C STATUS Final Replacement: No Details: 4� Rev. Requested by: -- COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V I BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 3-344 700 C Street AncM1orage, AK 99510 51 Lynda M. Yaskell and/or Lisa Boggs C Street, Suite 505 orage. AK 99503 of Alaska -AOGCC Natural Resources "rechnitian V. 7th Ave, Suite 100 .rage, Alaska 99501 R - Division of Oil &Gas "' a: Garret Brown West 711, Avenue, Suite 1100 �horaee. Alaska 99501 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Aochorace. Alaska 99508 TOTALS FOR THIS PAGE: FIELD / FINAL CD/DVD FINAL PRELIM I (las, dlis, PDF, META, SURVEY REPORT LOGS LOGS CGM, Final Surve ) (Compass) # OF PRINTS # OF COPIES # OF COPIES # OF COPIES 9 IR J; 4 I 0 2 5 4 0 ti 1.5' 21 8 g 1 8 North America - ALASKA - BP PBU 04 04-51 04-51 Design: 04-51 Final Survey Report 27 April, 2018 BAT UGHES a GE company IQ 0 o o o m m W m m b m n m b W a o W n m o N a o m v W r n m N N o P O O O O C Ol V m n H m o =ul N p m O O VI V W N N N n Q n O w O W N r 0 n m N m N m N O V a s U o of c o o 0 0 0 0 0 c o c o 0 0 0 0 o c N M J J Q Y � mm1 Om1 ❑ � J O � � a m m J Y Y Y m� O b m O O m b O b O W M w nn m N m N V W z V Cl b m b m C O m O O O a Vl m w m b m m n' V CI m Q O n b n Y w m w w m w m m m m w m w m m w m m m O 4 0 o w O Q w b n m w Cl N N m w n N m (7 b b b N m VI m b b VI w b m b N N Q C9' C W m (p eJ N W W I!1 m m b m W W W m m w W m m W m t m m m N m N N b pb N b m w m 10 N N m N N N N NN m w w m w w m w w w m m w m w m w w c U U U m � � O_ O_ O_ 3 3 'O CU y J U C C o G O m N w N w A N m m N A m a W N o m n m o p m A W b m A v Qp C L m O O O O pp O C O O C'1 t� q YI N N f0 0 r W m O 1J d� C U n � m m m K m L i i m N N 41 w LL LL LL .� a Q O❑❑❑ O O O O O O O O � � N q N tS1 141 1� � m m P OI D! O 0 T333 O a N W C N U U U 333 lL (h i i o W m m a O a o e m 0 N m. o o m m m w W a n b n w n w m ry w w W m N v W a •, (q ++ # m N W N Y m w m w W O m m N w O m O r M W b m m W � a o 0 0 0 owi m m m O N N N Li n of m n OO m N W w b w r b A m m m O N O N O N P b m A W m w O O N m O N Q N m N O V O N O O O O O O O W w n N 1`J N O m N `t `r m G ZJ Y Y Y Q N Q 0 N F A C7 O 0 O O O O C N V1 O A V A V m A m A` A O w m w A m n 10 b m O O m W V VI V V N m W JQ m O O' m O O O O O O O O O O O O O O O O O O O ym O N n Oi O Q Z a o 0 0 O N O N P O O O O O O O O O O b n O O N m m C O E b N m N n Y O 10 m b n O N 110 N W N V m m N N N O O d m m N W O N m A W w W O O N lh O b fl o o m O� i m a OI 1 T m H c A V W W c°�ab�i33o M W n N O M N W O N N O W W W W W O M O N N P N N N N N n W W W O n Q. fD O M fp W M W M [7 W n fO n 1V M W N n W Q N N m N O M m M C N tp O M W O Oi N m P W m m O N O N P n P A N O P n N W O O m m W P W Q W Q N N N n Ip N n W n Q W O m W W N O n M O W N n M M N Q W Q OO N b N r n m 0 h w m Z ` N N C N N Q j O O � M M N N N O O m m m W O Q N N Q N C O d O o W N N W M n O M O M n O N N M W M W R N W W N O n W P W W p 01 N N N Q P M N W f0 N N Y W M N r fV Q W N N W W M P m n Q. P W N b N M N m �1 n m N nn N P W m n W Q N N m N O M m M C N tp O M W O Oi N m P W m m O N O N P n P A N O P n N W O O m m W P N O W n W N m� m Z ` N N C N N Q j O O � M M N N N O O m m m W O Q N N Q N C O d O o W N N W M n O M O M n O N N O M W n W W M W W Q P N W N W m N n W N O M O W W W N W P Q N O N Q N m N m N N m W N m N N W m N m N m Q m P m Q m O m P m Q W W m m m m m W = Yf N N N N M N t7 O m N n M W P O N N n N W P O W N n M W N P r Q N N N O O W W W W W n b b_ N N N P P M M N N N aCW N N CI fV N^ - - - - - - - - - - - - - - - - - - - - W W O N W m M W N b O W N O N W O P O O O M n M n N b m j pj r yj OI pj 1� ` Oi P OI M f0 O N P (D m O N N W O N b O Q W M n N W N O P W M W N N O P W M n 10 O 2 M M ar 'q g N N b [t1 n n W W W W W O O N N M M Q w g W ID P W N O P M M M Q n b P N W O n Q M M N W O< N b n N W O P m n Q. P W N b N M N m �1 n m N nn N P W m n W Q N N m N O M m M N pj N tp O M W O Oi N m P W m m O N O N P n P A N O P n N W O O m m W P N O W n W N m Z ` N N C N N Q P M M N N N O O m m m W O Q N N Q N C O d O o d o 0 0 0 0 o d d o ai m ai ai of Ok ai m ai P P of Q m P m P W P W N W M m N W N m N W N m N m N N m W N m N N W m N m N m Q m P m Q m O m P m Q W W m m m m m W = Yf N N N N N N N N N N N N N N N N N N N N N N N N N W O N W m M W N b O W N O N W O P O O O M n M n N b m j pj r yj OI pj 1� ` Oi P OI M f0 O N P (D m O N N W O N b O Q W M n N W N O P W M W N N O P W M n 10 O 2 M M ar 'q g N N b [t1 n n W W W W W O O N N M M Q w g fp W^ W O W N M m n m N m N W W (O fD m N N P O m M PO N M n N W, NI N O N m P W M n N n N W N W P n N ' O N N OWI n W W W M O W N M O W N M O W N N O n n W W O O N M M P N ID fD n m m W O N N M P Q N M M M M P P P O P P P P P P P P P Q N N N N N N N N W ID P W N O P M M M Q n b P N W O n Q M M N W O< N b n N W O N P N b y Ny Q. N W !O M S O W O O ` M Q N 10 n W N N N n W CNj M m q a� N N N 10 14 f; r m 0 A N O O O N N Z ` M W O Q N N Q N M b M m W Q m N n N n W W n P Q W W Q N C M M O O D N N M p N M M M N N N M M Q N f0 W n W m m O n m N rmi -1: M e°Ji � Ci M C'1 M M Q P P Q P P Q Q Q P P P P Q N N N N N N N N r fp W^ W O W N M m n m N m N W W (O fD m N N P O m M PO N M n N W, NI N O N m P W M n N n N W N W P n N ' O N N OWI n W W W M O W N M O W N M O W N N O n n W W O O N M M P N ID fD n m m W O N N M P Q N M M M M P P P O P P P P P P P P P Q N N N N N N N N V c- a z 6 V W N O W fO N W fp n W b O m N W W P M W N m H w O n N m M N P W O V Q O m W W m N P Q m (O m N N Cl N b N W N n lV N W N n N b W O N O N O N O O O W Q m W W n n IO W N Q Q M M f N O O m W W W n W LL W m O N M P N W n W m O N MP N 10 f0 F W W O N N N N N N N N f0 W � V W N N W W W W W N N 10 W M n M W O P O W Q m P N M S W O W P O f M7 m O< M N ON1 N Q [7 l7 N fG n W m O � m W W n n N N N f0 N n n W n M W N Q W W Q N C M M O O D N N M N N M M M N N m m n rbi m� n m m e°pi n m ebi rmi m M e°Ji � n omi n m emi n m n V c- a z 6 V W N O W fO N W fp n W b O m N W W P M W N m H w O n N m M N P W O V Q O m W W m N P Q m (O m N N Cl N b N W N n lV N W N n N b W O N O N O N O O O W Q m W W n n IO W N Q Q M M f N O O m W W W n W LL W m O N M P N W n W m O N MP N 10 f0 F W W O N N N N N N N N f0 W � V W m m m v m n m m w r r N o n so T. a W ry 0 w m w N W m N m Q Q 6 "' ? N N N N C W W a a a U m o r m Q m w m m m m m 0 o N N m M N ri m m O m m ai m m r r of of r r rc m of w ei W ai w ei m w Y Y m m w ai o 6 K a 2 Q {V (V N 6 v v e e h m d Q Q j a V Y a � E d O C d u A U ® C y C J O ❑ � p 4 2 N D r a m O p m W N w' ONi N mM b h 00 2 W WN n N O CN'1 O N W N m V Y m co N GI n W m P W N N W N N N IL W Q m m mp Q N fO a r N n Vl m N N h V Qm V W V O m N r w m W W m Q r n U E b b a a T Y � m m m v m n m m w r r N o n so m o W ry 0 w m w N W m N m m W 6 "' ? N N O C W W N m o p m w m m m m o N N m M N ri W m N b vi w m m ai m m r r of of m ai m of w ei W ai w ei m w m w w ai o 6 o e {V (V N 6 v v e e h m a � W n m N O n Y N W N n N m m Q r W W N m N m m m W O N N N O C W W m O O O p p {.j pj pj G O O OO O C a � J O ❑ � VOi m O p m W N w' ONi N mM b h m n W WN n N O CN'1 O N W N m V Y m m O N N GI n W m P W N N W N N N V O N W Q m m mp Q N fO m N r N n Vl N N N h V Qm V W V O m N r w m W W m r r n fO b b W N O m w m h N W O m N V O N W W m W O N m m n N m m V O W m O I n O m m W m O m O N n O N O m n m O O m m m Vm ro m m m m ro m oe m oe m C W a s m Q m a m Q m e a6 v oe a m a v e a W m a e m a W e W v m e W a W a W e W C m W m O) W m W m W m m N N N m N N N N Z N M N N N N M N N N N N N r O N m N W O N m N m W fO N m m m N m m N r N V O W N b W N O N m W N W r r N N W O W N h V N m b N W m n r m N W (p (p r h m m m W W W O O O S O N N N cp � N N N (V N N M N N N N Cl m tm t? m m m o N V m h m N m V n N W V m lV N N (V N cV N N N N N N N N t. N N fV N CV N Z � m N W N n m n O V W m m O N r N N O W W w N w n m n n b N m of N ac o N 6 r of w vi m o a .0 m $ m o o m 6 W m o N m ai o N m n m m m o N m e a e m m N n n n r n n tli m rti m m tli � m m m m 0 m W OJ m C O Oi (p W n W N h m r 1` N O Wm n w N N w m n n N m h m m m O N w m O C m N N ai N � m m m ac h m m w W m W m O m � n 3 n r r r m m of ao o6 n n o 0 m r o m n m m ry m m� o m m mN n w uN NN aN vN v 3 M N N N M N N N N NN J o f N O W W N N N O N w W W n y M N N N N Q Q O m n m m r r n O iV m C Y a u ON p W u � o E w O m N m O m n O w m W O N r N O m O n O CO O W W O N w w O N m h n W Q W w O O N w m �� � m of of ai ai ai w m ai W ai � m a w of o o e o c o Q Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWeliSiteEnginee@bp.com> Sent: Tuesday, May 8, 2018 9:06 AM To: AK, OPS EOC Specialists; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS FS2 Field OTL; AK, OPS FS2 OSM; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AKOpsProdEOCTL; G GPB FS2 Drillsites; Richards, Meredyth; Oshiro, Joleen; Regg, James B (DOA) Cc: AK, GWO Completions Well Integrity, AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep; AKIMS App User, Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael; Janowski, Carrie, Montgomery, Travis 1; Munk, Corey, Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R; Tempel, Joshua; Worthington, Aras J; Wallace, Chris D (DOA) Subject: OPERABLE: Producer 04-51 (PTD #2180180) New grassroots rotary well, passed post rig MIT -T, MIT -IA Attachments: 04-51.pdf All, 04-51 (PTD #2180180) is a newly drilled grassroots producer completed on 4/23/2018. Slickline completed setting the production packer on 5/7/2018 and the well passed an MIT -IA to 3,769psi and MIT -T to 3,729psi. The passing pressure test confirms two competent well barriers. At this time the well is classified as Operable. Please note that there is remaining post rig work that needs to be completed before the well can be brought online. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 WO THE STATE °fALASKA GOVERNOR BILL WALKER Kenneth W. Allen Engineering Team Lead BP Exploration (Alaska), Inc. P.O Box 196612 Anchorage, AK 99519-6612 r Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www,00gcc.oloska.gov Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 04-51 BP Exploration (Alaska), Inc. Permit to Drill Number: 218-018 Surface Location: 4278' FSL, 362' FEL, Sec. 34, TI IN, RI 5E, UM Bottomhole Location: 1498' FSL, 3587' FEL, Sec. 34, T1 IN, RI 5E, UM Dear Mr. Allen: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French k Chair DATED this 7 day of March, 2018. STATE OF ALASKA f n.ASKA OIL AND GAS CONSERVATION COMMISS16 PERMIT TO DRILL 20 AAC 25.005 1 --III V CU FES 12 7mft 1a. Type of Work: 1b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑ 1c. Specify if w011(' r@se for' Drill 0' Lateral ❑ Streligraphic Test ❑ Development - Oil 0 • Service -Winj ❑ Single Zone 0• Coalbed Gas ❑ Gas Hydrates❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket 0 • Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 295105380 - PBU 0451 3 Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 10391' • ND: 9031' - PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well Govemmental Section : ( ) 7. Property Designation (Lease Number): ADL 028325 . 8 DNR Approval Number: 13. Approximate spud date: Surface: 4278' FSL, 362' FEL, Sec. 34, T1 IN, RISE. UM 1591' FSL, 3377' FEL, Sec. 34, T1 IN, RISE, UM 70-039 April 1, 2018 Top of Productive Horizon: 9. Acres in Property: 2560 14. Distance to Nearest Property: Total Depth: 1498' FSL, 3587' FEL, Sea 34, TI IN, RISE, UM 25600 41bLocation of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 76.7 • feet 15. Distance to Nearest Well Open Pool: t, Surface: x- 712497 • y- 5950860 Zone - ASP 4 GL Elevation aMSL' 29.7. teat bove Same 16. Deviated wells: Kickoff Depth: 2300 feet 17. Maximum Anticipated Pressures in prig (see 20 AAC 25.035) Maximum Hole Angle: 38 degrees Downhole: 3390 • Surface: 2503 18, Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hale Casinn Weight Grade Couolina Len th MO ND MD ND(including stage data 47' 20" x 34" 215.5# A-53 80' Surface Surface 80' 80' 260 sx Arctic Set (Aoorox.) 13-1/2" 10-3/4" 45.5# VAM 21&BTC 3894' Surface Surface 3894' 3777' 2130 sx LiteCrete, 255 sx Class'G' 9-7/8" 7" 26# L-80 VAMTOP HC 9832' Surface Surface 9832' ' 8525' 522 sx Class'G' 6-1/8" 4-117' 12.6# 13Cr85 VAMTOP 709' 9682' 8395 100 sx Class'G' 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth ND (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth ND (ft): Junk (measured): Casing Length Sin Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth ND (ft): Hydraulic Fracture planned? Yes ❑ No Id V7 -v ry20. 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Dale hereby certify a e toregoing is true and the procedure approved herein will not be deviatedContact Name Sperry, Nathan from without prior written approval. Authorized Name Allen, Kenneth W Contact Email Nathan.Speny@bp.cem Authorized Title Engineerm Team Lead Contact Phone 907-5641258 Authorized Signature F � Em" Date C> j Commission Use Only Permit to DrillPermit 23.s?7-6& ZAL Approval ` See cover letter for other Number. � API: 50-L1)Z_'V-- Date: ( requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: 13// Other: IIs P 71 -es -f- -1-p -35-6)0 1�j,5 11 q/ Samples req'd: Yes ❑/ No W Mud log req'd. Yes ❑ No Ltt /I ri h V /q f re V«L fit/'. 7 c Tt� H2S measures Yes E� No ❑/ Directional svy req'd: Yes GK No r-I�J t0 Z 7 ria 17 s l 9 Spacing exception req'd: Yes ❑ No Gd Inclinationonly svy req'd: Yes ❑ No C� /bw padd/c {N'Gi 1•V BCf GGO Citi%/ri1 Post initial injection MIT req'd: Yes ❑ No Pei- R oR/}c S,p 331j APPROVED BY -3 11-3 II Approved by: COMMISSIONER THE COMMISSION Date: !� \ �Fovn 10-401 Revised 5/2017 (rTL 31/2 -Ile This Permit is valid 2 o e proval 20 AAC 25.005(g)) Submit Form and Attachments In Duplicate To: Alaska Oil & Gas Conservation Commission From: Nathan Sperry, ODE Date: February 9, 2018 RE: 04-51 Permit to Drill The 04-51 well is scheduled to be drilled by Parker 272 in April 2018. This grassroots well is a slant producer targeting the Ivishak sands. The planned well is a three string, modified slimhole design using 10-3/4" surface casing, 7" intermediate casing, and 4-1/2" production liner. The surface casing will be set in the SV4. The intermediate casing will be set in the Shublik. The production interval will be completed with a cemented and perforated liner. The maximum anticipated surface pressure from the Ivishak with a full column of gas from TD to surface is 2,503 psi (assumes 7.35 ppg EMW most likely pore pressure and a 0.1 psi/ft gas gradient). The well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3 rams and an annular). The BOP rams and annular will be tested to 3,500 psi. A detailed operations summary is included with the permit application. If there are any questions concerning information on 04-51, please do not hesitate to use the contact information below. Nathan Sperry Office: (907) 564-4258 Cell: (907) 268-8416 Email:nathan.Sperrvgbp.com Attachments: Well Bore Schematic Directional Package BOPE Schematic Diverter Line Layout Diagram Well Head Schematic Tree Schematic 04-51 PTD 1 2/9/2018 Planned Well Summary Well 04-51 Well Type Producer Target Objective Ivishak Current Status Grass Roots Well Estimated Start Date: 4/01/2018 Time to Complete: 21.8 Da s Surface Northing Easting Offsets TRS Location 5,950,860 712,497 4278' FSL / 362' FEL 11N 15E Sec 34 Planned KOP: Northing Easting TVDss Offsets TRS Tgt 1 5,948,096 709,571 8,445 1596.0' FFSWLL 1909.8' 11N 15E Sec 34 Rig: Parker 272 RTE ref MSL : 76.7 Surve Pro ram: Reference attached directional program. Nearest Pro a Line: —25,600' Tgt 2 5,948,091 709,564 8,463 1591.2' FSL / 1902.6' 11 N 15E Sec 34 TSAD FWL Tgt 3 5,947,997 709,365 8,935 1502.8' F`SNLL 1700.9' 11N 15E Sec 34 Tgt 4 TD 5,947,992 709,357 8,954 1498'1 FSL 1692.8' 11 N 15E Sec 34 FWL Planned KOP: 2,300' MD Planned TD: 10,391' MD / 9,031' TVDss Maximum Hole Angle: —38° in the intermediate section —250 in the production section GL -RT: 46.95 be shut-in to pass scan criteria — reference "Surface and Anti -Collision Rig: Parker 272 RTE ref MSL : 76.7 Directional — Baker Hughes WP03 KOP: 2,300' MD - -38° in the surface section Maximum Hole Angle: —38° in the intermediate section —250 in the production section All offset wells pass BP anti -collision scan criteria, but some offsets must Close Approach Wells: be shut-in to pass scan criteria — reference "Surface and Anti -Collision Issues" section. Surve Pro ram: Reference attached directional program. Nearest Pro a Line: —25,600' Nearest Well within Pool: —1,130' 04-51 PTD 2 2/9/2018 Formation Tops and Pore Pressure Estimate Formation Depth (TVDss) ML Pore Pressure (ppg EMW) Fluid (for sands) Surface 1 8.40 Ice G1 439 8.40 Ice BPRF 1,885 8.40 Ice SV6 2,430 8.40 Water EOCU 3,120 8.40 Water SV4 3,235 8.40 Water SV3 3,735 8.40 Water SV2 3,925 8.40 Water SV1 4,340 8.40 Water UG4 4,905 9.30 Water UG3 5,105 9.30 Water UG1 5,760 9.30 Water WS2 6,380 9.00 Water OA 6,550 9.00 Water CM3 6,815 9.80 CM2 7,270 9.80 C M 1 7,870 10.00 THRZ 8,230 10.20 LCU/TSHC 8,438 7.57 TSAD 8,456 7.57 42N 8,541 7.52 Oil/Gas/Water TCGL 8,608 7.35 Oil/Gas/Water BCGL 8,655 7.35 Oil/Gas/Water 24N 8,737 7.35 24P 8,755 7.35 Oil/Gas/Water 23N 8,776 7.35 22P 8,802 7.35 Oil/Gas/Water TDF 8,901 7.36 04-51 PTD 3 2/9/2018 Casing/Tubing Program Hole Size Liner/ Wt/Ft Grade Conn Length Top Bottom 3,894' MD -TCM3 9.4-9.8. TbgO.D. pg) PV (CP) (Ib/100W) API FL MD MID /TVDss 42" 20" x 34" 215.5# A-53 - 80' Surface 156,7'/ 80' 13-1/2" 10-3/4" 45.5# L-80 VABMT221 & 3,894' Surface 3,894' / 3,700' 9-7/8" 7" 26# L-80 VAM TOP HC 9,832' Surface 9,832'/ 8,448' 6-1/8" 4-1/2" 12.6# 13Cr-85 VAM TOP 709' 9'682 10,390'/ 8,954' (150' la Tubing 4-1/2" 12.6# 13Cr-85 VAM TOP 9,687' Surface 9,687'/ 6656' -5' into liner PBR) Mud Program Surface Mud Properties: MMS 13-1/2" Hole Section Section Density PV (cp) Ib/ P API FIL HTHP FL MST LSR-YP 3,894' MD -TCM3 9.4-9.8. Depth Interval pg) PV (CP) (Ib/100W) API FL (2x3 - 6) pH <20 8.5-9.5 m Surface - 3,894' MD 8,7-9.2 -1 <15 25-60 10-11 Intermediate Mud Properties: LSND 9-7/8" Hole Section Depth Interval Density PV (cp) Ib/ P API FIL HTHP FL MST pH 3,894' MD -TCM3 9.4-9.8. 1 8-18 1 18-25 <5 1 NA <20 8.5-9.5 TCM3 - 9,832'MD 1 9.8-11.0• 8-18 1 18-25 <51 <10 <20 8.5-9.5 Production Mud Properties: Water Based Polymer Fluid 1 6-1/8" Hole Section Depth Interval�� Oen Hole: PV (cp) Ib/YP API FL HTHP FL MST pH 9,832' MD - TD 8.6 - 9.8 - <8 12-20 <12 NA <4 85-9.5 Logging Program 13-1/2" Surface Sam le Catchers - not required for surface hole Drillin Dir/GR/Res Oen Hole: I None Cased Hole: None 9-7/8" Intermediate I Sample Catchers - as required by Geology Drilling: Dir/GR/RES Oen Hole: I None Cased Hole: one 6-1/8" Production Sample Catchers -as required by Geology Drilling: Dir/GR/RES/NEU/DEN Open Hole: None Cased Hole: None 04-51 PTD 4 2/9/2018 Cement Program Casing Size 10-/4" 45.6# L-80 Vern 21 & BTC Surface Casing Lead Oen hole volume + 350% excess in permafrost 140% excess below permafrost Basis Lead TOC Surface Tail Oen hole volume + 40% excess + 80 ft shoe track Tail TOC 500 ft MD above casing shoe Spacer 100 bbls of 10 ppg Viscosified Spacer Mud Push II Total Cement Lead 724.3 bbls, 4067 cult, 2130 sks 11.0 ppg LiteCRETE - 1.91 cuft/sk Volume Tail 53.0 bbls, 298 cult, 255 sks 15.8 ppg Class G — 1.17 cuft/sk Temp BHST 72° F CasingSize 7" 26# L-80 / 13CR-80 Vam Top HC Intermediate Casing Lead N/A Basis Lead TOC NIA Tail Oen hole volume + 40% excess + 80 ft shoe track Tail TOC 1600 ft MD above casing shoe Spacer 40bblsofl2.5ppgViscosified Spacer Mud Push II Total Cement Lead N/A Volume Tail 108.6 bbls, 610 cult, 522 sks 15.8 ppg Class G —1.17 cuft/sk Temp BHST 179' F Casing Size 4-1/2" 12.6# 13CR-85 Vam Top Production Liner - Lead N/A Basis Lead TOC N/A Tail Oen hole volume + 30% excess + 80' shoe track + liner la + 200' 4" DP x 7" LNR annulus Tail TOC Top of liner S acer 20 bbls of 11 pp9 Viscosified Spacer Mud Push II Total Cement Lead N/A Volume Tail 20.7 bbls, 116 cult, 100 sks 15.8 ppg Class G —1.17 cuft/sk Temp BHST 183` F Surface and Anti -Collision Issues Surface Proximity: No wells will be affected by the Parker 272 rig shadow. Anti -Collision: All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan criteria: r/ • 04-03 — Shut in at surface. Offset well ownership information All offset wells identified within 200 ft of the proposed wellbore are operated by BP. 04-51 PTD 5 2/9/2018 Hydrogen Sulfide DSO4 is considered an H2S site. Recent H2S data from the Dad is as follows: Faults There are no planned fault crossings for the 04-51 well trajectory. Drilling Waste Disposal • There is no annular injection in this well. ' • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB Environmental Advisors (659-5893) for guidance. 04-51 PTD 6 2/9/2018 Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level 04-03 4 03/08/2017 #2 Closest SHL Well 112S Level 04-04A 320 10/07/1994 #1 Closest BHL Well H2S Level 0403 4 03/08/2017 #2 Closest BHL Well H2S Level 0447 275 10/29/2017 #3 Closest BHL Well H2S Level 11-18 70 03/26/2017 #4 Closest BHL Well H2S Level 04-30 7 11/0 5/2017 Max Recorded H2S on Pad/Facility 04-49 1950 07/01/2001 Faults There are no planned fault crossings for the 04-51 well trajectory. Drilling Waste Disposal • There is no annular injection in this well. ' • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB Environmental Advisors (659-5893) for guidance. 04-51 PTD 6 2/9/2018 Well Control The 13-1/2" surface hole will be drilled with a diverter (see attached diverter layout). The 9-7/8" hole and 6-1/8" hole sections will be drilled with well control equipment consisting of 5,000 psi working pressure rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP test frequency for 04-51 will be 14 -days with function test every 7 -days. Except in the event of a significant operational issue that may affect well integrity or pose safety concerns, an extension to the 14 -day BOP test period should not be requested. 9-7/8" Intermediate Interval Maximum anticipated BHP 3,065 psi in the OA at 6,550' TVDss 9.0 ppg EMW, 6,618' TVD Maximum surface pressure 2,403 psi in the OA 0.10psi/ft gas gradient to surface Kick tolerance 25 bbls with 11.7 ppg frac gradient. Assumes 7.57 ppg pore pressure in the Ivishak + 0.5 ppg kick intensity and 10.2 ppg MW Planned BOP test pressure Rams test to 3,500 psi / 250 psi Annular test to 3,500 psi / 250 psi Integrity Test — 9-7/8" hole LOT after drilling 20'-50' of new hole 7" Casing Test 3,500 psi surface pressure 6-1/8" Production Interval Maximum anticipated BHP 3,390 psi in the 22P at 8,802' TVDss 7.35 ppg EMW, 8,869' TVD Maximum surface pressure 2,503 psi in the 22P 0.10 si/ft gas gradient to surface Kick tolerance Infinite with >9.3 ppg frac gradient. Assumes 7.57 ppg pore pressure in the Ivishak + 0.5 ppg kick intensity and 8.6 ppq MW Planned BOP test pressure Rams test to 3,500 psi / 250 psi Annular test to 3,500 psi / 250 psi Integrity Test — 6-1/8" hole FIT after drilling 20'-50' of new hole 4.1/2" Liner Top Packer 3,500 psi surface pressure Planned completion fluids 8.5 ppg seawater / —100 ft TVD diesel 04-51 PTD 7 2/9/2018 Variance Requests 1. To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line (<1000 ft). This is a variance from 20 AAC 25.033. s- Procedures/Safeguards with paddle removed: • Fluid levels will be monitored in the pits for both gains and losses while drilling. Alarms will be set to indicate if gain or loss of more than 10 bbls has occurred. • The well will be monitored for flow when the pumps are off at each connection. • The planned 8.7 — 9.2 ppg fluid will provide over -balance to formation fluid. 04-51 PTD 8 2/9/2018 Drill and Complete Operations Summary Pre -Rig Operations 1. Install and survey 20" conductor and cellar box. 2. Weld on landing ring. Rig Operations 1. MIRU Parker 272. 2. Nipple up diverter system and function test. 3. MU 13-1/2" surface motor drilling assembly (GR) and drill to TD at 3,984' MD. Perform wiper trip. POOH and LD drilling assembly. 4. Run 10-3/4" casing to TD and cement. Test casing to 3500 psi. 5. Nipple down diverter system. Nipple up 11" wellhead system. Nipple up BOPE and test to 3qk0 psi. 6. MU 9-7/8" intermediate RSS drilling assembly (GR/RES) and drill shoe track and 20'-50' formation. 7. Perform LOT. } 11. 7-PP;I- 8. Drill to 9-7/8" section to TD at —9,832' MD, topsetting the Shublik C formation. Perform wiper trip. POOH and LD drilling assembly. 9. Run 7" casing to TD and cement. Test casing to 3500 psi. 10. Install 7" casing packoff and test to 3500 psi. Inject freeze protect into 7" x 10-3/4" annulus. 11. MU 6-1/8" production RSS drilling assembly (GR/RES/NEU/DEN) and drill shoe track and 20'- 50' formation. 12. Perform FIT. 13. Drill 6-1/8" section to TD at —10391' MD in the Kavik shale. Perform wiper trip. POOH and LD drilling assembly. 14. Run 4-1/2" liner to TD and cement. Set hanger and liner top packer. POOH and LD liner running assembly. 15. Test liner / liner top packer to 3500 psi. 16. Run and land 4-1/2" completion. 17. Reverse circulate completion brine with corrosion inhibitor. Drop ball and rod and set production packer. individually test tubing and IA to 3500 psi. 18. Shear GLV and circulate diesel freeze protect cap as needed. Set TWC and test to 3500 psi. 19. Nipple down BOPE. Nipple up adapter and dry hole tree and test to 4500 psi. 20. RDMO Parker 272. Post -Rig Operations 1. Pull TWC and perform tree work as needed 2. Pull B&R/RHC. Drift for perforating. Set GL design 3. Perforate —10' in Z4 04-51 PTD 9 2/9/2018 04-51 Drillinq Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures A. Surface Hole: The SVs are expected to be at 8.4 ppg EMW. Formation pressures will be controlled with 8.7 — 9.2 ppg mud to section TD. The surface casing is planned to be set above possible free gas zones. B. Intermediate Hole: The Ugnu is expected to be at 9.3 ppg EMW. This section will TD in the Shubiik. The Sag River will not be present and the Ivishak will be penetrated in the production hole section. Formation pressures will be controlled with 9.4 — 10.2 ppg mud (up to 11.0ppg for shale stability if needed). C. Production Hole: The Ivishak is expected to range from 7.35 ppg EMW to 7.57 ppg EMW. Reservoir pressures will be controlled by using 8.6 — 9.2 ppg mud. — ---- II. Lost Circulation/Breathing A. Surface Hole: There are no expected fault crossings in this interval. The risk of lost circulation is considered to be low. B. Intermediate Hole: There are no expected fault crossings in this interval. The risk of lost circulation is considered to be low. - C. Production Hole: There are no expected fault crossings in this interval. The risk of lost circulation is considered to be low. — III. Fault Locations There are no planned fault crossings for the 04-51 trajectory. IV. Integrity Testing Test Point I Test Depth Te pe EMW Ib! al 10-3/4" Shoe 20'-50' from the shoe LOT 11.7 pp 7" Shoe 20'-50' from the shoe FIT 1 9.3 ppg V. Hydrogen Sulfide DSO4 is considered an H2S site. Recent H>S data from the nad is ac fnOnwc VI. Anti -Collision Issues All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan / criteria: 0404=03 (surface, intermediate, and production drilling). V/ CONSULT THE DSO4 DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. 04-51 PTD 10 2/9/2018 Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level 04-03 4 03/08/2017 #2 Closest SHL Well H2S Level 04-04A 320 10/07/1994 #1 Closest BHL Well H2S Level 04-03 4 03/08/2017 92 Closest BHL Well H2S Level 04-47 275 10/29/2017 #3 Closest BHL Well H2S Level 11-18 70 03/26/2017 #4 Closest BHL Well H2S Level 04-30 7 11/05/2017 Max Recorded H2S on Pad/Facility 04-49 1950 07/01/2001 VI. Anti -Collision Issues All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan / criteria: 0404=03 (surface, intermediate, and production drilling). V/ CONSULT THE DSO4 DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. 04-51 PTD 10 2/9/2018 _Y 5• I 4 - /04—XX 2• I 40 1. I L DS4 f 22 SSU FCO ` PINGUT PAD 29 Il 2 fJRE INT RI DS -11 J � - os— FS-2 S Fs -2 • 35 • 34 3 THIS PRO.ECf 20 •21 •22 PBCC� • 23 • 24 X19 � �7p i�� 2 'DSI -3 ,; •�. .i6 VICINITY MAP . 33 NTS �• 36 139 LEGEND: •11 GEODETIC POSITION(DMS) •25 AS—BUILT CONDUCTOR X1 CELLAR BOX EL. IFLANGE .y52 EXISTING CONDUCTOR • 13 E 660.00 ' 27— SEC. 26 -- ELECTRICAL CABLES • 14 SE 3C #E LIGHT POLE • 28 N/A 15 •29 •30 NOTES: •31 1. ALASKA STATE PLANE COORDINATES ARE NAD27 ZONE 4. •32 2. GEODETIC POSITIONS ARE NAD27. - 37] 3. BASIS OF LOCATION IS BPXA OPERATOR MONUMENTS 4A & 4B. NAM Ot 1 B 4. BASIS OF ELEVATION IS BPXA MLLW DATUM. ME NG ox.wFIR Qe19 os4 m 5. AVERAGE DS4 PAD SCALE FACTOR IS 0.9999512. 1 a 1 6. UNDERGROUND HAZARD RERFERENCE: CED -0000-049 PG. 221. GRAPHIC SCALE 0 250 500 1000 ( IN FEET ) 1 inch = 500 R. LOCATED WITHIN PROTRACTED SEC. 34, T. 11 N., R. 15, E., UMIAT MERIDIAN, ALASKA WELL NO. A.S.P. COORDINATES PLANT COORDINATES GEODETIC POSITION(DMS) GEODETIC POSITION(D.DD) -SECTION OFFSETS PAD ELEVATION1 CELLAR BOX EL. IFLANGE BASE EL. 04—XX Y= 5,950,860.29N(—)2,635.00 X= 712,497.41 E 660.00 70'16'07.603" 148'16'53.137" 70.2687785' 148.2814268' 4,278' FSL 362' FEL N/A N/A N/A rell µam KK „ 1� n43v1 by JACOB6 JACOBS NAM Ot 1 B ME NG ox.wFIR Qe19 os4 m DRILL SITE 4' PROPOSED CONDUCTOR WELL 04—XX 1 a 1 .� KKfl tt„�, r = soo• N0. Y..IE NEY1gLN BY pIK SITE LOCATION MAP PARKER RIG 272 DSO4-51 Grassroots HARMONY HUB #183 ---- I Enf=- L. Stor ***MU STER AREA*** SIGN -IN TRAILER ign-In Trailer r Erlten'Exit Y #k g Bull Rail O IMurtfrom W¢Ilhouzel O1 625' BRMimd mv.mVd1 BOMo Storage 1508' = � WELL PRODUCER. ■ or ❑ DATE :7r2W2613 WELL INJECTOR ABLASTZONE _ _ ' _E : 1" = 360" P8U - DS4 WELL SLOT WfCONDUCTOR 13 16WDATE :201 1.77. -�. nmary Rig Entrance Rig with I rt, 256' Blast r` _ Diverter 75' Blast —r Tj 13U r ��- 4v Radius MT r pp q V 1.Y R O � O d A '1 0 BRMimd mv.mVd1 BOMo Storage 1508' = � WELL PRODUCER. ■ or ❑ DATE :7r2W2613 WELL INJECTOR ABLASTZONE _ _ ' _E : 1" = 360" P8U - DS4 WELL SLOT WfCONDUCTOR 13 16WDATE :201 t -�. nmary Rig Entrance Rig with I 256' Blast _ Diverter 75' Blast Radius Radius Cuttings Box � O d f BRMimd mv.mVd1 BOMo Storage 1508' = � WELL PRODUCER. ■ or ❑ DATE :7r2W2613 WELL INJECTOR ABLASTZONE _ _ ' _E : 1" = 360" P8U - DS4 WELL SLOT WfCONDUCTOR 13 16WDATE :201 t I BRMimd mv.mVd1 BOMo Storage 1508' = � WELL PRODUCER. ■ or ❑ DATE :7r2W2613 WELL INJECTOR ABLASTZONE _ _ ' _E : 1" = 360" P8U - DS4 WELL SLOT WfCONDUCTOR 13 16WDATE :201 North America - ALASKA - BP Prudhoe Bay PB DS 04 04-51 04-51 Plan: 04-51 WP03 Standard Planning Report 08 February, 2018 BA ER I UGHES a GE company BP BA. �(ER bp Planning Report U 'HES _ GEcompany Database: EDM R5K-Alaska PROD -ANCP1 Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 04 Well: 04-51 Wellbore: 04-51 Design: 04-51 WP03 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method Well 04-51 Pian KB @ 76.70usft Plan KB @ 76.70usft True Minimum Curvature Project Prudhoe Bay, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones - System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27'OGP-Usa AK/Alaska zone 4[2673411586, - Using geodetic scale factor Site PB DS 04, TR -11-15 Site Position: Northing: From: Map Easting: Position Uncertainty: Azimuth 0.00 usft Slot Radius: Well 04-51 Rate Rate Well Position +N/ -S -2,439.67 usft Northing: (usft) +E/ -W 1,194.48 usft Easting: Position Uncertainty (11100usft) 0.00 usft Wellhead Elevation: Wellbore 04-51 Magnetics Model Name Sample Date BGGM2017 4;1/2018 Design 04-51 WP03 Audit Notes: Version: Phase: Vertical Section: Depth From (TVD) (usft) 47 00 Plan Sections 5,953,265.350 usft Latitude: 70' 16'31.598 N 711,234.970 usft Longitude: 148' 17'27.907 W 0.000 in Grid Convergence: 1.61 ° 5,950,860.290 usft • Latitude: 70` 167,603 N 712,497.410 usft 1 Longitude: 148' 16'53.137 W 29.70 usft Ground Level: 29.70 usft Declination Dip Angle Field Strength (nT) 17.52 8098 57,476 PLAN Tie On Depth: -NI-S +EI -W (usft) (usft) 0.00 0.00 4700 Direction (1) 235 00 Measured Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/ -S •EI -W Rate Rate Rate TFO (usft) O (°) (usft) (usft) (usft) (1I100usft) (°1100usft) (11100usft) (1) i 4700 0.00 0.00 47.00 0.00 0.00 0.00 000 000 0.00 2,208.70 0.00 0.00 2,208.70 0.00 0.00 0.00 0.00 0.00 0.00 2,506.70 3.00 226.00 2,508.56 -5.45 -5.65 1.00 1.00 0.00 226.00 2,808.70 9.00 226.00 2,806.78 -27.23 -28.20 2.00 2.00 0.00 0.00 3,782.98 38.23 226.98 3,689.84 -291.57 -309.52 3.00 3.00 0.10 1.24 8,900.98 38.23 226.98 7,710.39 -2,452.16 -2,624.91 0.00 0.00 0.00 0.00 9,448.44 25.00 246.00 8,176.70 -2,615.89 -2,856.01 3.00 -2.42 347 150.85 9,821.38 25.00 246.00 8,514.70 -2,680.00 -3,000.00 0.00 0.00 0.00 0.00 10,360.94 25.00 246.00 9,003.70 -2,772.75 -3,208.31 0.00 0.00 0.00 0.00 10,390.94 25.00 246.00 9,030.69 -2,777.90 -3,219.89 0.00 0.00 0.00 0.00 Target 2/812018 3:18:36PM Page 2 COMPASS 5000.1 Build BID Database: EDM RSK- Alaska PROD -ANCP1 Company: NOM Amenca- ALASKA - BP Project: Prudhoe Bay Site: PB DS 04 Well: 04-51 Wellbore: 04-51 Design: 0451 WP03 Planned Survey Measured Well 04-51 Depth Inclination (usft) (°) 47.00 0.00 100.00 0.00 200.00 0.00 300.00 0.00 400.00 0.00 500.00 0.00 515.70 0.00 GL (usft) 600.00 0.00 700.00 0.00 800.00 0.00 900.00 0.00 1,000.00 0.00 1,100.00 0.00 1,200.00 0.00 1,300.00 0.00 1,400.00 O.o0 1,500.00 0.00 1,600.00 0.00 1,700.00 0.00 1,800.00 0.00 1,900.00 0.00 1,961.70 0.00 BPRF 0.00 2,000.00 0.00 2,100.00 0.00 2,200.00 0.00 2,208.70 0.00 Start Build 1.00 0.00 2,300.00 0.91 2,400.00 1.91 2,500.00 2.91 2,506.83 2.98 SV6 0.00 2,508.70 3.00 Start OLS 2.00 TFO 0.00 2,600.00 4.83 2,700.00 8.83 2,800.00 8.83 2,808.70 9.00 Start DLS 3.00 TFO 1.24 2,900.00 11.74 3,000.00 14.74 3,100.00 17.74 3,200.00 20.74 3,213.26 21.14 EOCU 0.00 3,300.00 23.74 3,349.26 25.22 SV4 0.00 3,400.00 26.74 3,500.00 29.74 3,600.00 32.74 0.00 0.00 BP B/►�(ER Planning Report UGHES �e mmoam Local Co-ordinate Reference: Well 04-51 TVD Reference: Plan KB @ 76.70usft MD Reference: Plan KB @ 76.70usft North Reference: True Survey Calculation Method: Minimum Curvature 226.79 Vertical -122.16 -128.46 Vertical Dogleg Build Turn Azimuth Depth -NI-S +EI -W Section Rate Rate Rate (°) (usft) (usft) (usft) (usft) (°1100usft) ('I100usft) (*M00usft) 0.00 47.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 000 000 200.00 0.00 0.00 0.00 0.00 000 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 515.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 900.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,900.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,961.70 ODO 0.00 0.00 0.00 0.00 0.00 0.00 2,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,208.70 0.00 0.00 0.00 0.00 0.00 0.00 226.00 2,300.00 -0.51 -0.52 0.72 1.00 1.00 0.00 226.00 2,399.96 -2.22 -2.30 3.15 1.00 1.00 0.00 226.00 2,499.87 -5.14 -5.33 7.31 1.00 1.00 0.00 226.00 2,506.70 -5.39 -5.58 7.66 1.00 1.00 0.00 226.00 2,508.56 -5.45 -5.65 7.76 1.00 1.00 0.00 226.00 2,599.65 -9.78 -10.13 13.91 2.00 2.00 0.00 226.00 2,699.12 -16.83 -17.43 23.93 2.00 2.00 0.00 226.00 2,798.19 -26.29 -27.23 37.38 2.00 2.00 0.00 226.00 2,806.78 -27.23 -28.20 38.71 2.00 2.00 0.00 226.29 2,896.58 -38.61 40.05 54.95 3.00 3.00 0.32 226.49 2,993.92 -54.40 -56.63 77.59 3.00 3.00 0.20 226.62 3,089.91 -73.62 -76.93 105.25 3.00 3.00 0.13 226.71 3,184.32 -96.23 -100.90 137.85 3.00 3.00 0.09 226.72 3,196.70 -99.48 -104.34 142.53 3.00 3.00 0.08 226.79 3,276.87 -122.16 -128.46 175.29 3.00 3.00 0.07 226.81 3,321.70 -136.13 -143.34 195.49 3.00 3.00 0.06 226.84 3,367.32 -151.33 -159.55 217.49 3.00 3.00 0.05 226.89 3,455.41 -183.68 -194.07 264.32 3.00 3.00 0.05 226.93 3,540.90 -219.10 -231.93 315.66 3.00 3.00 0.04 202018 3:18:36PM Page 3 COMPASS 5000.1 Build 81D ng BAKER bp Planning Report (UGHES ER a GEC=Par, Database: EDM RSK- Alaska PROD -ANCPt Local Co-ordinate Reference: Well 04-51 Company: North Amenca- ALASKA -BP TVD Reference: Plan K8 @ 76.70usft Project: Prudhoe Bay MD Reference: Plan KB @ 76.70usft Site: PB DS 04 North Reference: True Well: 04-51 Survey Calculation Method: Minimum Curvature Wellbore: 04-51 Design: 04-51 WP03 Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +NI -S +E/ -W Section Rate Rate Rate (usft) )^) (`) (usft) (usft) (usft) (usft) (,/10ousft) (°1100usft) (°1100usft) 3,700.00 35.74 226.96 3,623.56 -257.51 -27304 371.36 3.00 300 0.03 3,782.96 38.23 226.98 3,689.84 -291.57 -309.52 420.78 3.00 300 0.03 Start 5118.01 hold at 3782.98 MD 3,800.00 38.23 226.98 3,703.21 -298.76 -317.22 431.21 0.00 0.00 0.00 3,893.55 38.23 226.98 3,776.70 -338.25 -359.54 488.53 0.00 0.00 0.00 SCP (in base SV4) 3,900.00 38.23 226.98 3,781.77 -340.97 -362.46 492.49 0.00 0.00 0.00 3,850.83 38.23 226.98 3,821.70 -362.43 -385.46 523.63 0.00 0.00 0.00 SV3 4,000.00 38.23 226.98 3,860.33 -383.19 407.70 553.76 0.00 0.00 0.00 4,100.00 38.23 228.98 3,938.88 -425.40 452.94 615.03 0.00 0.00 0.00 4,196.51 38.23 226.98 4,014.70 466.15 -496.61 674.17 0.00 0.00 0.00 SV2 4,200.00 38.23 226.98 4,017.44 -467.62 -498.18 676.30 0.00 0.00 000 4,300.00 38.23 226.98 4,096.00 -509.83 -543.42 737.58 0.00 0.00 0.00 4,400.00 38.23 226.98 4,174.55 -552.05 -588.66 798.85 0.00 0.00 0.00 4,500.00 36.23 226.98 4,253.11 -594.26 -633.90 860.12 0.00 0.00 0.00 4,600.00 36.23 226.98 4,331.67 -636.48 -679.14 921.39 0.00 0.00 0.00 4,700.00 38.23 226.98 4,410.22 -678.70 -724.38 982.66 0.00 0.00 0.00 4,727.34 38.23 226.98 4,431.70 -690.24 -736.75 999.42 0.00 0.00 0.00 SV7 4,800.00 38.23 226.98 4,488.78 -720.91 -769.62 1,043.94 0.00 0.00 0.00 4,900.00 38.23 226.98 4,567.34 -763.13 -614.66 1,105.21 0.00 0.00 0.00 5,000.00 38.23 226.98 4,645.89 -805.34 -860.10 1,166.48 0.00 0.00 0.00 5,100.00 38.23 226.98 4,724.45 -847.56 -905.34 1,227.75 0.00 0.00 0.00 5,200.00 38.23 226.98 4,803.01 -889.77 -950.58 1,289.03 0.00 0.00 0.00 5,300.00 38.23 226.98 4,881.57 -931.99 -995.82 1,350.30 0.00 0.00 0.00 5,400.00 38.23 226.98 4,960.12 -974.20 -1,041.06 1,411.57 0.00 0.00 0.00 5,432.56 38.23 226.98 4,985.70 -987.95 -1,055.79 1,431.52 0.00 0.00 0.00 UG4 5,500.00 38.23 226.98 5,038.68 -1,016.42 -1,086.30 1,472.84 0.00 0.00 0.00 5,600.00 38.23 226.98 5,117.24 -1,058.64 -1,131.54 1,534.12 0.00 0.00 0.00 5,682.06 38.23 226.98 5,181.70 -1,093.28 -1,168.67 1,584.40 0.00 0.00 0.00 UG3 5,700.00 38.23 226.98 5,195.79 -1,100.85 -1,176.79 1,595.39 0.00 0.00 0.00 5,800.00 38.23 226.98 5,274.35 -1,143.07 -1,222.03 1,656.66 0.00 0.00 0.00 5,900.00 38.23 226.98 5,352.91 -1,185.28 -1,267.27 1,717.93 0.00 0.00 0.00 6,000.00 36.23 226.98 5,431.46 -1,227.50 -1,312.51 1,779.21 0.00 0.00 0.00 6,100.00 38.23 226.98 5,510.02 -1,269.71 -1,357.75 1,840.48 0.00 0.00 0.00 6,200.00 38.23 226.98 5,588.58 -1,311.93 -1,402.99 1,901.75 0.00 0.00 0.00 6,300.00 38.23 226.98 5,667.13 -1,354.14 -1,448.23 1,963.02 0.00 0.00 0.00 6,400.00 38.23 226.98 5,745.69 -1,396.36 -1,493.47 2,024.29 0.00 0.00 0.00 6,500.00 38.23 226.98 5,824.25 -1,438.57 -1,538.71 2,085.57 0.00 0.00 0.00 6,510.76 38.23 226.98 5,832.70 -1,443.12 -1,543.57 2,092.16 000 0.00 0.00 UGI 6,600.00 38.23 226.98 5,902.80 -1,480.79 -1,583.95 2,146.84 0.00 0.00 0.00 6,700.00 38.23 226.98 5,981.36 -1,523.01 -1,629.19 2,208.11 0.00 0.00 0.00 6,800.00 38.23 226.98 6,059.92 -1,565.22 -1,674.43 2,269.38 0.00 0.00 0.00 6,900.00 38.23 226.98 6,138.48 -1,607.44 -1,719.67 2,330.66 0.00 0.00 0.00 7,000.00 38.23 226.98 6,217.03 -1,649.65 -1,764.91 2,391.93 0.00 0.00 0.00 7,100.00 38.23 226.98 6,295.59 -1,691.87 -1,810.15 2,453.20 0.00 0.00 0.00 7,200.00 38.23 226.98 6,374.15 -1,734.08 -1,855.39 2,514.47 0.00 0.00 0.00 7,300.00 38.23 226.98 6,452.70 -1,776.30 -1,900.63 2,575.75 0.00 0.00 0.00 2/82018 3:18:36PM Page 4 COMPASS 5000.1 Build 61D �., b ningng BJER P PlanReport UGHES aGEcanyarry Database: EDM RSK-Alaska PROD-ANCP7 Local Coordinate Reference: Well 04-51 Company: North America - ALASKA - BP TVD Reference: Plan KB@ 76.70usft Project: Prudhoe Bay MD Reference: Plan KB @ 76.70usft Site: PB DS 04 North Reference: True Well: 04-51 Survey Calculation Method: Minimum Curvature Wellbore: 04-51 (usft) (usft) Design: 04-51 WP03 (°1100usft) ('1100usft) Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth .N1 -S +EI -W Section Rate Rate Rate (usft) O O (usft) (usft) (usft) (usft) (°1100usft) ('1100usft) ('1100usft) 7,305.09 38.23 226.98 6,456.70 -1,778.45 .1,902.93 2.578.86 0.00 0.00 0.00 WS2 7,400.00 38.23 226.98 6,531.26 -1,818.51 -1,945.87 2,637.02 0.00 0.00 0.00 7,500.00 38.23 226.98 6,609.82 -1,860.73 -1,991.11 2,698.29 0.00 0.00 0.00 7,521.49 38.23 226.98 6,626.70 -1,869.80 -2,000.83 2,711.46 0.00 0.00 0.00 OA 7,600.00 38.23 226.98 6,688.37 -1,902.95 -2,036.35 2,759.56 0.00 0.00 0.00 7,700.00 38.23 226.98 6,766.93 -1,945.16 -2,081.59 2,820.83 0.00 0.00 0.00 7,800.00 38.23 226.98 6,845.49 -1,987.38 -2,126.83 2,882.11 0.00 0.00 0.00 7,858.83 38.23 226.98 6,891.70 -2,012.21 -2,153.44 2,918.15 0.00 0.00 0.00 CM3 7,900.00 38.23 226.98 6,924.D4 -2,029.59 -2,172.07 2,943.38 0.00 0.00 0.00 8,000.00 38.23 226.98 7,002.60 -2,071.81 -2,217.31 3,004.65 0.00 0.00 0.00 8,100.00 38.23 226.98 7,081.16 -2,114.02 -2,262.55 3,065.92 0.00 0.00 0.00 8,200.00 38.23 226.98 7,159.72 -2,156.24 -2,307.79 3,127.20 0.00 0.00 0.00 8,300.00 38.23 226.98 7,238.27 -2,198.45 -2,353.03 3,188.47 0.00 0.00 0.00 8,400.00 38.23 226.98 7,316.83 -2,240.67 -2,398.27 3,249.74 0.00 0.00 0.00 8,438.02 38.23 226.98 7,346.70 -2,256.72 -2,415.47 3,273.04 0.00 0.00 0.00 CM2 8,500.00 38.23 226.98 7,395.39 -2,282.88 -2,443.51 3,311.01 0.00 0.00 0.00 8,600.00 38.23 226.98 7,473.94 -2,325.10 -2,488.75 3,372.29 0.00 0.00 0.00 8,700.00 38.23 226.98 7,552.50 -2,367.32 -2,533.99 3,433.56 0.00 0.00 0.00 8,800.00 38.23 226.98 7,631.06 -2,409.53 -2,579.23 3,494.83 0.00 0.00 0.00 8,900.00 38.23 226.98 7,709.61 -2,451.75 -2,624.47 3,556.10 0.00 0.00 0.00 8,900.98 38.23 226.98 7,710.39 -2,452.16 -2,624.91 3,556.70 0.00 0.00 0.00 Start DLS 3.00 TFO 150.85 9,000.00 35.66 22946 7,789.52 -2,491.83 -2,669.25 3,615.78 3.00 -2.59 2.51 9,100.00 33.12 232.30 7,872.04 -2,527.49 -2,713.03 3,672.09 3.00 -2.54 2.84 9,192.73 30.83 235.30 7,950.70 -2,556.52 -2,752.62 3,721.17 3.00 -2.47 3.23 CM1 9,200.00 30.66 235.55 7,956.95 -2,558.62 -2,755.68 3,724.89 3.00 -2.42 3.46 9,300.00 28.29 239.29 8,044.01 -2,585.16 -2,797.09 3,774.02 3.00 -2.37 3.74 9,400.00 26.04 243.64 8,132.98 -2,607.01 -2,837.14 3,819.36 3.00 -2.25 4.35 9,448.44 25.00 246.00 8,176.70 -2,615.89 -2,856.01 3,839.92 3.00 -2.14 4.88 Start 372.94 hold at 9448.44 MD 9,500.00 25.00 246.00 8,223.43 -2,624.76 -2,875.92 3,861.31 0.00 0.00 0.00 9,599.61 25.00 246.00 8,313.70 -2,641.88 -2,914.38 3,902.54 0.00 0.00 0.00 THRZ 9,600.00 25.00 246.00 8,314.06 -2,641.95 -2,914.53 3,902.80 0.00 0.00 0.00 9,700.00 25.00 246.00 8,404.69 -2,659.13 -2,953.14 3,944.28 0.00 0.00 0.00 9,800.00 25.00 246.00 8,495.32 -2,676.32 -2,991.74 3,985.77 0.00 0.00 0.00 9,821.38 25.00 246.00 8,514.70 -2,680.00 -3,000.00 3,994.64 0.00 0.00 0.00 Start 639.55 hold at 9821.36 MD 9,829.11 25.00 246.00 8,521.70 -2,681.33 -3,002.98 3,997.85 0.00 0.00 0.00 LCWTSHC 9,83242 25.00 246.00 8,524.70 -2,681.90 -3,004.26 3,999.22 0.00 0.00 0.00 ICP (in top of SHU C) 9,848.97 25.00 246.00 8,539.70 -2,684.74 -3,010.65 4,006.08 0.00 0.00 0.00 TSAD 9,900.00 25.00 246.00 8,585.95 -2,693.51 -3,030.35 4,027.26 0.00 0.00 0.00 9,942.76 25.00 246.00 8,624.70 -2,700.86 -3,046.86 4,044.99 0.00 0.00 0.00 42N 10,000.00 25.00 246.00 8,676.58 -2,710.70 -3,068.96 4,068.74 0.00 0.00 0.00 2/W018 3:18:36PM Page 5 COMPASS 5000.1 Build 81D by PlanniBP ng Report UER GHES a GE compary Database: EDM RSK-Alaska PROD -ANCP1 Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PS DS 04 Well: 04-51 Wellbore: 04-51 Design: 04-51 WP03 Planned Survey Hole Diameter Measured Dogleg Build Depth Inclination Azimuth (usft) () -El-W (I 10,015.58 25.00 246.00 TCGL lust) (usft) 10,068.54 25.00 246.00 BCGL 8,690.70 -2,713.38 10,100.00 25.00 246.00 10,157.91 25.00 248.00 24N -3,095.42 4,097.17 10,175.57 25.00 246.00 24P -2,727.89 -3,107.57 10,200.00 25.00 246.00 10,202.05 25.00 246.00 23N 4,134.25 0.00 10,215.29 25.00 246.00 22N -3,135.74 4,141.58 10,229.63 25.00 246.00 22P -2,745.08 -3,146.18 10,300.00 25.00 246.00 10,316.80 25.00 246.00 7000 4,152.56 0.00 10,339.97 25.00 246.00 TDF -3,152.08 4,158.05 10,360.94 25.00 246.00 Start 30.00 hold at 10360.94 MD 10,368.66 25.00 246.00 BSAD 0.00 0.00 10,390.94 - 25.00 246.00 TD at 10390.94 0.00 0.00 Casing Points 8,963.70 -2,765.16 Measured 4,200.17 Vertical Depth 0.00 Depth Wait) -3,200.22 (usft) Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 04-51 Plan KB @ 76.70usi t Plan KB @ 76.70usft True Minimum Curvature Vertical Hole Diameter Vertical Dogleg Build Turn Depth .N/ -S -El-W Section Rate Rate Rate (usft) lust) (usft) (usft) ('1100usft) ('1100usft) ('1100usft) 8,690.70 -2,713.38 -3,074.97 4,075.20 0.00 0.00 0.00 8,738.70 -2,722.48 -3,095.42 4,097.17 0.00 0.00 0.00 8,767.21 -2,727.89 -3,107.57 4,110.23 0.00 0.00 0.00 8,819.70 -2,737.85 -3,129.93 4,134.25 0.00 0.00 0.00 8,835.70 -2,740.88 -3,135.74 4,141.58 0.00 0.00 0.00 8,857.84 -2,745.08 -3,146.18 4,151.71 0.00 0.00 0.00 8,859.70 -2,745.43 -3,146.97 4,152.56 0.00 0.00 0.00 8,871.70 -2,747.71 -3,152.08 4,158.05 0.00 0.00 0.00 8,884.70 -2,750.18 -3,157.62 4,164.00 0.00 0.00 0.00 8,948.47 -2,762.27 -3,184.78 4,193.20 0.00 0.00 0.00 8,963.70 -2,765.16 -3,191.27 4,200.17 0.00 0.00 0.00 8,984.70 -2,769.14 -3,200.22 4,209.78 0.00 0.00 0.00 9,003.70 -2,772.75 -3,208.31 4,218.48 0.00 0.00 0.00 9,010.70 -2,774.07 -3,211.29 4,221.68 0.00 0.00 0.00 9,030.89 -2,777.90 -3,219.89 4,230.92 0.00 0.00 0.00 3,893.55 3,776.70 103/4" 9,832.42 8,524.70 7" 10,390.94 9,030.89 4 1/7' Casing Hole Diameter Diameter Name (in) (in) 10.750 12.250 7.000 9.875 4.500 6.125 7/8/2018 3:18:36PM Page 6 COMPASS 5000.1 Build 81D b BJER P Planning Report UGHES 0enr„wm Database: EDM R5K-Alaska PROD-ANCPI Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 04 Well: 04-51 Wellbore: 04-51 Design: 04-51 WP03 Formations Measured Vertical Local Coordinates Depth Depth -NI-S (usft) (usft) Name 51570 515.70 G1 1,961.70 1,961.70 BPRF 2,505.83 2,506.70 SV6 3,213.26 3,196.70 EOCU 3,349.26 3,321.70 SW 3,893.55 3,776.70 SCP (in base SV4) 3,950.83 3,821.70 SV3 4,196.51 4,014.70 SV2 4,727.34 4,431.70 SVI 5,432.56 4,985.70 UG4 5,682.06 5,181.70 UG3 6,510.76 5,832.70 UG1 7,305.09 6,456.70 WS2 7,521.49 6,626.70 OA 7,858.83 6,891.70 CM3 8,438.02 7,346.70 CM2 9,192.73 7,950.70 CMI 9,599.61 8,313.70 THRZ 9,829.11 8,521.70 LCUrrSHC 9,832.42 8,524.70 ICP (in top of SHU C) 9,848.97 8,539.70 TSAD 9,942.76 8,624.70 42N 10,015.58 8,690.70 TCGL 10,068.54 8,738.70 BCGL 10,157.91 8,819.70 24N 10,175.57 8,835.70 24P 10,202.05 8,859.70 23N 10,215.29 8,871.70 22N 10,229.63 8,884.70 22P 10,316.80 8,963.70 7000 10,339.97 8,984.70 TDF 10,368.66 9,010.70 BSAD Plan Annotations Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Measured Vertical Local Coordinates Depth Depth -NI-S +E/ -W (usft) (usft) (usft) (usft) 2,208.70 2,208.70 0.00 0,00 2,508.70 2,508.56 -5.45 -5.65 2,808.70 2,806.78 -27.23 -28.20 3,782.98 3,689.84 -291.57 -309.52 8,900.98 7,710.39 -2,452.16 -2,624.91 9,448.44 8,176.70 -2,615.89 -2,856.01 9,821.38 8,514.70 -2,680.00 -3,000.00 10,360.94 9,003.70 -2,772.75 -3,208.31 10,390.94 9,030.89 -2,777.90 -3,219.89 Lithology Comment Well 04-51 Plan KB @ 76.70usft Plan KB @ 76.70usft True Minimum Curvature Start Build 1.00 Start DLS 2. W TFO 0.00 Start DLS 3.00 TFO 1.24 Start 5118.01 hold at 3782.98 MD Start DLS 3.00 TFO 150.85 Start 372.94 hold at 9448.44 MD Start 539.55 hold at 9821.38 MD Start 30.00 hold at 10360.94 MD TD at 10390.94 Dip Dip Direction r) (`) 21WO18 3:18:36PM Page 7 COMPASS 5000.1 Build 810 North America - ALASKA - BP Prudhoe Bay PB DS 04 04-51 04-51 04-51 WP03 Anticollision Summary Report 08 February, 2018 BAT IGI0 1 a GE company �.. bp BP BA�CER Anticollision Report UGHES a GEcw ,,. y Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 04 Site Error: O.00usft Reference Well: 04-51 Well Error: O.00uaft Reference Wellbore 0451 Reference Design: 04-51 WP03 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 0451 Plan KB @ 76.70usft Plan KB @ 76.70usft True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Reference 0451 WP03 Filter type: NO GLOBAL FILTER: Using user defined selection & fftering criteria To Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,234.39usft Error Surface: Elliptical Conic Survey Tool Program Date 2/8/2018 From To (usft) (us8) Survey (Wellbore) Tool Name Description 47.00 1,300.00 0451 WP03(04-51) GVD-GC-SS Gyrodata gyro single shots 1,300.00 3,894.00 0451 WP03(04-51)MWD Distance MWD - Standard 1,300.00 3,894.000451 WP03 (04-51) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 3,894.00 9,832.00 0451 WP03 (04-51) MWD MWD -Standard 3,894.00 9,832.00 0451 WP03 (04-51) MWD+IFR+MS-WOCA MIND + IFR +Mufti Station W/O Crustal 9,832.00 10,390.94 04-51 WP03(04-51)MWD MWD -Standard 9,832.00 10,390.940451 WP03 (04-51) MWD+IFR+MS-WOCA MWD+IFIR +Multi Station W/O Crustal Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usftj (usft) (usft) (usft) PB DS 04 0401 - 04-01 - 04-01 3,041.91 3,000.00 326.70 52.09 274.66 Pass - Major Risk 04 -01 -04 -01A -04-01A 3,041.91 3,000.00 326.70 51.82 274.93 Pass - Major Risk 0401-04-01A- Plan #3 3,041.91 3,000.00 326.70 51.82 274.93 Pass - Major Risk 04-02 - 04-02 - 04-02 3,138.40 3,125.00 182.56 47.29 135.36 Pass - Major Risk 0402 - 04-02A- 04-02A 3,147.04 3,125.00 182.77 47.55 135.30 Pass - Major Risk 0403 - 04-03 - 0403 2,890.70 2,875.00 87.75 8.72 79.05 Pass - Minor 1/200 0404 - 04-04 - 0404 2,336.73 2,325.00 79.76 35.47 44.31 Pass - Major Risk 04 -04 -04 -04A -04-04A 2,336.73 2,325.00 79.76 35.47 44.31 Pass - Major Risk 04-05-04-05-0405 2,212.51 2,200.00 266.80 33.42 233.38 Pass -Major Risk 0405 -04 -05A -04-05A 2,198.37 2,175.00 266.63 33.27 233.36 Pass -Major Risk 0405-04-05PB1-D4-05PBl 2,212.51 2,200.00 266.80 33.42 233.36 Pass - Major Risk 0406 -04 -DB -04-O6 3,613.96 3,700.00 127.84 71.15 61.58 Pass - Major Risk 0406-04-06P81-04-06PBI 2,502.35 2,500.00 390.32 49.80 340.52 Pass - Major Risk 04-30 - 0430 - 0430 7,892.76 8,600.00 900.66 643.54 757.15 Pass - Major Risk 04-30 - 04-30PB1 - 04-30PB1 7,692.76 8,600.00 900.66 643.54 757.15 Pass - Major Risk 0440 - 0440 - 0440 3,074.56 3,050.00 219.10 45.79 173.31 Pass - Major Risk 0445 - 0445 - 0445 2,715.32 2,750.00 333.66 50.09 283.92 Pass - Major Risk 0447 - 04-47 - 0447 6,636.68 7,575.00 332.17 210.80 128.17 Pass - Major Risk ZWO18 1:23:36PM Page 2 of 3 COMPASS 5000.1 Build 81D BP by Anticollision Report JUGHES GEc.,.n, Company: North America -ALASKA -BP Project: Prudhoe Bay Reference Site: PB DS 04 Site Error: 0 oousft Reference Well: 0451 Well Error: 0.00usft Reference Wellbore 0451 Reference Design: 0451 WP03 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 0451 Plan KB @ 76.70usft Plan KB @ 76.70usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to Plan KB @ 78 70usft Coordinates are relative to: 04-51 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Use AK Central Meridian is 150° 0'0.000 W' Grid Convergence at Surface is: 1.62" Ladder Plot 0 2000 4000 6000 8000 10000 12000 Measured Depth (2000 usftlin) -0-- 04-04,0404A,04-04AV1 -(- 04-04,04-04,04-04V1 -b- 04-01,04-01,04-01 V1 -j- 04-01,04-01A,04-0tAV3 $ 0401,04-01A,Plan#3V8 $ 0402,04-02A,04-02AV1 $ 04-02,04-02,04-02 V1 LEGEND �F 0403,04-03,04-03V1 04-05,0405,0405V1 -� 04-40,04-40,04-40 V1 04 -05,04 -05P81,04 -05P81 V1 -{- 0445,04-05,04-45V1 $ 04-06,0406,04-06V1 $ 04-30,04J0PB1,0430P81 V1 $ 04-06,04-06PB1,04-06PB1 V1 $ 0430,0430,0430 V1 $ 0451 VWP03 -4r 04-47,0447,04-47V1 -F 0405,04-05A,0405AV1 2/82018 1:23:36PM Page 3 of 3 COMPASS 5000.1 Build 81D Xj I '4 m(ut/Usn 00£)(+)ql ,o§ a ^nN p m�Q 8 g HUM 8g a :a �ioermYm�a g m� s� N (um�{sn OS) (+)gllON/(-)glnoS 8 g HUM 8g a OOS) g1doQ Ieoi]uap anil �ioermYm�a g �ao iQo N _eq3 a�gBSSrvQ�eO %J o?n $p a me ooe�N.e.a ..00m o OOS) g1doQ Ieoi]uap anil �ioermYm�a g �ao iQo N _eq3 a�gBSSrvQ�eO %J o?n $p a aN3;8 ooe�N.e.a ..00m o �oovj�m�mgmfa C 0 - � �o$��uri_`_'me�$ o aSRNm�meR�^' Z`Rj I Rt z� :e3��.��m�R c s .�.SSgO0mgg8e CL OOS) g1doQ Ieoi]uap anil £tW a \ — --� \�- \! J }. a 0 4 North America - ALASKA - BP Prudhoe Bay PB DS 04 04-51 04-51 04-51 WP03 Plus 500ft MD AOGCC Offset Well Report 08 February, 2018 BA�nJKUGHES 0 1 a GE company BP s� by Anticollisicn Report BF�UGHES �erom��,y Company: North Amend -ALASKA-BP Project: Prudhoe Bay Reference Site: PB DS 04 Site Error: O.00usft Reference Well: 0451 Well Error: O.00usft Reference Wellbore 0451 Reference Design: 04-51 WP03 Plus 500ft MD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 04-51 Plan KB @ 76.70usft Plan KB @ 76.70usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 0451 WP03 Plus 500ft MD Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference To Interpolation Method: MD Interval 100.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Train. Cylinder North Results Limited by: Maximum center -center distance of 1,284.39usft Error Surface: Elliptical Conic Survey Tool Program Data 2/8/2018 From To Offset Centre to (usft) (usR) Survey (Wellbore) Tool Name Description 4700 1,30000 04-51 WP03 Plus 500ft MD (04-51) GYD-GC-SS Gyrodata gyro single shots 1,300.00 3,894.00 04-51 WP03 Plus 500ft MID (04-51) MWD MWD - Standard 1,300.00 3,894.0004-51 WP03 Plus 500ft MD (04-51) MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal 3,894.00 9,832.0004-51 WP03 Plus 500ft MD (04-51) MWD MWD -Standard 3,894.00 9,832.000451 WP03 Plus 50011 MD(04-51)MWD+IFR+MS-WOCA 3,000.00 MWD+IFR +Multi Station W/O Crustal 9,832.00 10,390.9404-51 WP03 Plus 500ft MD (04-51) MWD MWD -Standard 9,832.00 10,890.9404-51 WP03 Plus 500ft MD (04-51) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usR) (usft) (usft) PB DS 04 04-01 - 04-01 - 04-01 3,041.91 3,000.00 328.70 04-01 - 04-01 A - 04-01A 3,041.91 3,000.00 326.70 0401-04-01A- Plan #3 3,041.91 3,000.00 326.70 0402 - 04-02 - 0402 3,116.15 3,100.00 182.46 0402 - 04-02A - 04-02A 3,124.91 3,100.00 182.42 0403 - 04-03 - 0403 9,562.34 9,700.00 250.34 0404 - 04-04 - 0404 2,311.92 2,300.00 79.52 0404 -04 -04A -04-04A 2,311.92 2,300.00 79.52 0405 - 04-05 - 0405 2,212.54 2,200.00 266.80 0405 - 04-05A - 04-05A 2,223.03 2,200.00 266.95 0405-04-05PB1-04-05PB1 2,212.54 2,200.00 266.80 0406 - 04-06 - 0406 3,613.96 3,700.00 127.84 0406-04-06PB1-04-06PB1 2,502.31 2,500.00 390.32 0430 - 04-30 - 0430 7,892.76 8,600.00 900.66 0430-04-30PB1-04-30PB1 7,892.76 8,600.00 900.66 04-40 - 04-00 - 04-40 3,121.44 3,100.00 220.68 04-05 - 04-45 - 04-45 2,668.14 2,700.00 332.63 04-07 - 0447 - 04-07 6,660.97 7,600.00 332.80 04-51 - 04-51 - 0451 WP03 3,700.00 3,700.00 0.00 2/8@018 2: 44 14P Page 2 of 39 COMPASS 5000.1 Build 81D TREE= WELLHEAD= ACTUATOR = KB. aEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum ND= 88W SS PROPOSED REV 2 I30'x , 20"INSULAItD CONDUCTOR A -59 D = 18.75" 10-3/4" CSG, 45.5#. L-80 VAM 21. ID = 9.950" Minimum ID = 3.725" @ HES XN NIPPLE ESTIMATED TOP OF CEMENT (XX/XX/XXXX) 41/2" TBG, 12.6#, 13CR-85, VAM TOP, .0125 bpf, D = 3.958" 17" CSG, 26#, L-80, VAM TOP HC, ID = 6.276" 1 PERFORATION SUhAWRY REF LOG: ANGLEATTOP PERF: Note: Refer to Production OB for historical pert data SIZE SPF I NrERVAL OpNSgz SHOT SOZ 1/2" LNR, 12.6#, 13CR-85, VAM TOP, .0152 bpf,H lB39B' = 3.958" �04-51 101 SAM r NOTES: SSSV Required -12- 5LC IR -555V, IU = GAS LET MANDRELS 14-1/2" HF' 7" x 4-1/2" -LS TN i PKR, ID = 3 856" 4-1/2" HES X- NIP, ID = 3.813" 4-1/2" HES XN-NIP, -7" x 5" WFD LTP w /TIEBACK SLV & WFD HGR ID = BJVD TT LOGGED NOT LOGG® J PRUDHOE BAY UNIT WELL: '04-51 PERMT No: XXX -XXX API ND: 50-029-XXXXX-00 N. R E XXXX' FNL & XXXX FEL BP Brploration (Alaska) WP a oh IlewFIL I I f. 7 •�r• alar¢ ue ]-1/5• w nN<m 1WkPl alE wive �l/r w FuxGEn s we v�5c 3-1/Y w FL3n 1osE aua AIN RaL IE\. D CaiI1.R/.liw DEP Fal Rt oE x k NE arFOoolf ON al 9p5519955 GE1N.HIp113 1 Yi T MIPPUE W. MEN SPACERSPOOL u 5/r w FINN w 13W w FLvNGw WROY —14— SPILW $FWL 5/r w nN¢ laP 13 13 s/s• w RAriW Wr1oN 55NSIa SnmW Aa1PIER 13 5/r w F1NLW 1W 11' w NIIaD WnSN a9G 51VOL A541BY ii' w nNsm AGE It' w F1NI5W WlmY ASIC 1FM A55u6Y Il' w FLNiW roP 6012 BOP STACK (DRAFT ]Y ow Prt SFIl REIaO ro IIE WFtaR a IIE nINW3 3o-3ro• 3REA oP. 1M1F IRl/dA9£ NNmt SFAL RFIL ffu ane le as IWtA, 1r w WRm r 1u amn can GE z) 15 5/r 5/r w Wnw lIrt F1AxG[ 11 a1 r oN sm amn (1 al r ole sm au115r molal Inas ooa luno[ ANNULAR 13-s/r w s51FrtR ul la-s/r w i tar o-sro• w nAxan conal PNI lyre W . 13 5/r w I W15 wLmRE WP 13 5/k• w S11NW mr 13 5/r w FLANGED W11a1 •/ 3-1/2' aNYI Waa Y/ 11' 135 Bo05'IFR a moss u 5/r w SmNom lOP u s/s' S eons • (y 1 � /e s' SM w SAME amus Nu u - s-1/le' w fld Nos[ ]-1/1r w N 3-1/r w 6SA l -1/i• w FLANGE, MANUAL GATE ,LSP 3-t/s' w F1NIan IYIOPN.ex am vuE RYI IYFE W. 13 51W w Na' W12 SR6E WP 13 s/r w SRVOW for IS 5/If w FwiGED W 8.3.17 L.C.) Loepp, Victoria T (DOA) From: Sperry, Nathan <Nathan.Sperry@bp.com> Sent: Monday, March 12, 2018 9:24 AM To: Loepp, Victoria T (DOA) Subject: RE: PBU 04-51(PTD 218-018) Fracture Stimulate? Good Morning Victoria, No, there are no plans to fracture stimulate this well. Thanks, Nathan Sperry Drilling Engineer C:(907)268-8416 0:(907)564-4258 From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.gov] Sent: Monday, March 12, 2018 9:22 AM To: Sperry, Nathan <Nathan.Sperry@bp.com> Subject: PBU 04-51(PTD 218-018) Fracture Stimulate? Nathan, Are there any plans to fracture stimulate this well? Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 V ictoria. LoeooCdalaska. aov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria LoeDD@alaska.Qoy TRANSMITTAL LETTER CHECKLIST WELL NAME: PTD: Development —Service —Exploratory _ St�ratigraphic Test —Non -Conventional FIELD: POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50-- _ (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- — from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 5/2013 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 PTO* 2180180 Company BP_EXPLORATION (ALASKA) INC. Initial Class/Type Well Name: PRUDHOE BAY UNIT 04-51 Program DEV Well bore seg ❑ BEV / PEND GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven, gas conforms to A831,05.0300.1.A),(j,2.A-D) _ _ _ _ _ _ _ Date: 3113 3 Date 1 Permit fee attached, . . . . . . . . . . ....... . . . . . . . . . .. . .... . NA ........ _ 2 Lease number appropriate.. _ . . . . . . . ............... . . .. . . Yes _ _ _ . _ _ Entire Well lies within ADL0028325._ 3 Unique well name and number _ _ ........ _ _ ..... Yes ... 4 Well located in a. defined pool _ _ _ .. .. . . . . . . . . . . .......... . Yes ..... PRUDHOE BAY, PRUQHOE OIL POOL - 64015, govemed by CO 341 F 5 Well located proper distance from drilling unit. boundary_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ CO 341_F, Rule 2:_ There shall be no restrictions as to well spacing. except that. no pay shall be _ 6 Well located proper distance from other wells _ _ _ _ _ _ _ ____ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ opened in a well poser than 500 feet to the boundary of the affected area. Planned well conforms to CO 7 Sufficient acreage available in drilling unit... .. _ _ _ _ _ _ _ _ _ _ .. _ Yes ... $41 F, RuJe 2........ 8 If deviated, is wellbore plat.included _ _ _ _ _ _ _ _ _ _ _ _ _ Yes 9 Operator only affected party. - - - - - - - - - - _ _ _ _ _ Yes 10 Operator has appropriate bond in force _ _ _ ... _ ----- Yes_ .. -------- ---.. ... Appr Date 11 Permit can be issued without conservation order ______ Yes 12 Permit can be issued without administrative approval _ _ _ _ Yes 7 2/13/2018 13 Can permit be approved before 15 -day wait _ _ _ _ _ _ _ _ .. - _ - _ - - Yes _ 14 Well located within area and strata authorized by Injection Order # (put 0# in comments).(For. NA 15 All wellswithin 114 mile area of review identified (For service well only) _ _ _ _ _ _ . _ _ NA 16 Pre -produced injector, duration of preproduction less than 3 monthg(For service well only) NA 18 Conductor string provided .... . . . . . . . . . . . . . .................. . ... . Yes _ _ _ _ _ _ _ 80' conductor set Engineering 19 Surface casing. protects all known USDWs _ _ _ _ _ _ _ _ _ _ _ __________ _ _ _ _ _ _ _ _ _ Yes _ _ _ Surface casing set to 3894' MD 20 CMT. vol adequate to circulate on conductors surf csg _ _ _ _ _ _ _ _ _ _ ...... _ .. _ Yes 209% excess, 21 CMT vol, adequate to tie-in long string to surf csg ... _ _ _ _ _ _ _ _ _ _ _ _ _ _ No.. 22 CMT will cover all known productive horizons . . . . . . . ........... . . . . . . . . . . Yes _ _ _ _ Productive interval will be completed wittt cemented production liner and perforated 23 Casing designs adequate for CJ, B &_ permafrost_ _ _ _ . ................... Yes .. 24 Adequate tankage or reserve pit _ _ _ _ _ _ _ _ _ _ __________ _ _ _ _ Yes _ _ _ _ _ _ Rig has steel tanks; all waste to approved disposal wells 25 If a. re -drill, has a 10-403 for abandonment been approved _ _ _ _ _ _ _ _ ...... _ _ NA...... _ _ .......... . . . . . . . . . .... . . . . 26 Adequate wellbore separation proposed _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ Anti -collision analysis complete; 04-03 fails major.risk and.will be $I@ -surf during drilling _ 27 If diverter required, does it.meet regulations _ _ _ ________ _ _ _ _ _ _ _ _ Yes _ _ _ _ Diverter size and route meet regulations; flow paddle waiver <1000' drilling per 20 AAC25.033 Appr Date 28 Drilling fluid program schematic.8, equip list adequate.. _ _ _ _ _ _ _ _ _ _ _ _ Yes ..... Max formation pressure is 3390 psig(7.35 ppg EMW ); will drill w/8,6-11,0_ppg EMW VTL 3/12/2018 29 BOPEs,.do they meet regulation ---- - - - - - - - - - - - - - - ........... Yes 30 BCPE.pmss rating appropriate; test to.(put psig in comments)_ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ MP$P is 2503 psig; will test BOPS to 3500. prig .............. . . . . . . . . 31 Choke. manifold complies w/API_ RP -53 (May 84). _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes 32 Work will occur without operation shutdown- . . . . . . . . ................ Yes 33 Is presence of H2$ gas probable______ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ . H2$ measures required. 134 � 35 Mechanical_ condition of wells within AOR verified (For service well only) . ............ . Permit can be issued w/o hydrogen aulfide measures ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA No ........... _ . _ ..... _ _ _ _ DS 04 wells are HZS-bearing, H28 measures are required._ Geology 36 Data. presented on potential overpressure zones . . . .......... . . . . . .. . . . . . . . Yes - _ - Planned mud weights are adequate for the operator's most likely.pore.fimssures forecast. Aper Date 37 Seismic analysis of shallow gaszones _ _ _ _ . ...................... NA.... SFD 2/13/2018 38 Seabed condition survey.(if off -shore) _ _ _ _ _ _ _ _ _ _ _ ____________ _ _ _ _ _ _ _ _ _ _NA 39 Contact name/phone for weekly, progress reports_ [exploratory only] . . ............... NA...... Geologic Engineering Public Commissioner: SVS Date: 3113 3 Commissioner: Date Co i ioner 44`4- Date �