Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout218-029DATA SUBMITTAL COMPLIANCE REPORT
119/2019
Permit to Drill 2180290 Well Name/No. PRUDHOE BAY UNIT 11-23B C61- Operator BP EXPLORATION (ALASKA) INC. API No. 50-029.21610-02-00
MD 15157 TVD 8618 Completion Date 5/19/2018 Completion Status 1-0I1 Current Status 1-0I1 OC No
REQUIRED INFORMATION / /
Mud Log No ✓ Samples No Directional Survey Yes
DATA INFORMATION
List of Logs Obtained: MWD/ GR/ RES, MWD/ GR/ RES/ DEN/ NEU
Well Log Information:
Log/ Electr
Data Digital Dataset Lo Lo Run
Name
Type Med/Frmt Number 9 g
Scale Media No
ED C 29527 Digital Data
ED C 29527 Digital Data
ED C 29527 Digital Data
ED C 29527 Digital Data
ED C 29527 Digital Data
ED C 29527 Digital Data
ED C 29527 Digital Data
ED C 29527 Digital Data
ED C 29527 Digital Data
ED C 29527 Digital Data
AOGCC
Page 1 4 5
(Nom Master Well Data/Logs)
Interval
OHI
Start Stop
CH Received
Comments
6430 15157
7/12/2018
_
Electronic Data Set, Filename: 11-23B
_BHGE_LTK_MEM_FE Composite Drilling
Data.las
6340 6520
7/12/2018
Electronic Data Set, Filename: 11-
23B_BHGE_ OTK(8.50)_Runo2_MEM _Madpass_
6343-6478_Depth.las
7/12/2018
Electronic File: 11-
23B_BHGE_LTK_2MD_Memory Ddiling_Log.cgm
7/12/2018
Electronic File: 11
236_BHGE_LTK_2TVDss_Memory
Drilling_Log.cgm
7/12/2018
Electronic File: 11-
23B_BHGE_LTK_5MD_Memory Drilling_Log.cgm
7/12/2018
Electronic File: 11-
23B_BHGE_LTK_5TVDss_Memory
Ddlling_Log.cgm
7/12/2018
Electronic File: 11-
23B_BH GE_ OTK(8.50)_Run02_2MD_Mem_Mad
pass_6382-6521.cgm
7/12/2018
Electronic File: 11-
23B BHGE_ OTK(8.50)_Run02_2TVDSS_Mem_
Madpass_4768-4850.cgm
7/12/2018
Electronic File: 11-
23B_BHGE_ OTK(8.50)_Run02_5MD_Mem—Mad
pass_6382-6521.cgm
7/12/2018
Electronic File: 11-
231_BHGE_ OTK(8.50)_Run02_5TVDSS_Mem_
Madpass_4768-4850.cgm
Wednesday, January 9, 2019
DATA SUBMITTAL COMPLIANCE REPORT
1/9/2019
Permit to Drill
2180290 Well Name/No. PRUDHOE BAY UNIT 11-23B Operator
BP EXPLORATION (ALASKA) INC. API No. 50-029-21610-02-00
MD
15157
TVD 8618 Completion Date 5/19/2018 Completion Status 1-0IL
Current Status 1-0I1 UIC No
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11-23B_BHGE_LTK_FE
Composite Drilling Data.dls
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11-
236_BHGE_ OTK(8.50)_Run02_Mem_Madpass_
4834-5078_Depth.dls
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11-
23B_BHGE_LTK_2MD_Memory Drilling_Log.pdf
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11-
23B_BHGE_LTK 2TVDss_Memory
Drilling_Log.pdf
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11-
23B_BHGE_LTK_5MD_Memory Drilling_Log.pdf
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11
23B_BHGE_LTK_5TVDss_Memory
Drilling_Log.pdf
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11-
236_BHGE_ OTK(8.50)_Run02_2MD_Madpass_
ME M_6343-6478_Log.pdf
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11-
23B_BHGE_ OTK(8.50)_Run02_2TVDSS_Madpa
ss_MEM_4768-4848_Log.pdf
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11-
23B_BHGE_OTK(8.50)_Run02_5MD_Madpass_
MEM_6343-6478_Log.pdf
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11-
238_BHGE_ OTK(8.50)_Run02_5TVDSS_Madpa
ss_MEM_4768-4848_Log. pdf
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11-23B_BHGE_Final Survey
Report.pdf
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11-23B_BHGE_Final Survey
Report.txt
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11-23B_BHGE_ FinalSurveys.csv
ED
C
29527 Digital Data
7/12/2018
Electronic File: 11-23B_BHGE_FinalSurveys.xls
Log
C
29527 Log Header Scans 0 0
2180290 PRUDHOE BAY UNIT 11-23B LOG
HEADERS
Log
C
29528 Log Header Scans 0 0
2180290 PRUDHOE BAY UNIT 11-23B PB1
LOG HEADERS
AOGCC
Page 2 0l' 5
Wednesday, January 9, 2019
DATA SUBMITTAL COMPLIANCE REPORT
1/9/2019
Permit to Drill
2180290 Well Name/No. PRUDHOE BAY UNIT 11-23B
Operator
BP EXPLORATION (ALASKA) INC. API No. 50-029-21610-02-00
MD
15157
TVD 8618 Completion Date 5/19/2018
Completion Status
1-0I1- Current Status 1-0I1 UIC No
ED
C
29528 Digital Data
6430 13750
7/12/2018
Electronic Data Set, Filename: 11-236
PB1 _BHGE_LTK_MEM—FE Composite Drilling
Data.las
ED
C
29528 Digital Data
6340 6520
7/12/2018
Electronic Data Set, Filename: 11-
23B P B 1 _B H G E_OTK( 8.50 )_Run 02_MEM Ma d p
ass_6343-6478_Depth.las
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-23B
PB1 _BHGE_LTK_2MD_Memory
Drilling_Log.cgm
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-23B
PB1 BHGE_LTK_2TVDss_Memory
Drilling_Log.cgm
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-23B
PB1 BHGE_LTK_5MD_Memory
Drilling_Log.cgm
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-23B
PB1 _BHGE_LTK_5TVDss_Memory
Drilling_Log.cgm
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-
23B BHGE_ OTK(8.50)_Run02_2MD_Mem_Mad
pass_6343-6478.ogm
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-
23B_BHGE_ OTK(8.50)_Run02_2TVDSS_Mem_
Madpass_4768-4848.cgm
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-
236_BHGE_OTK(8.50)_Run02_5MD_Mem_Mad
pass_6343-6478.cgm
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-
23BBHGE_OTK(8.50)_Run02_5TV DSS_Mem_
Madpass__4768-4848.cgm
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-23B PB1 _BHGE_LTK_FE
Composite Drilling Data.dls
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-
23BP81_BHGE_ OTK(8.50)_Run02_Mem_Madpa
ss_6343-6478_Depth.dls
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-23
PB1 _BHGE_LTK_2TVDss_Memory
Drilling_Log.pdf
AOGCC Page 3 of 5 Wednesday, January 9, 2019
DATA SUBMITTAL COMPLIANCE REPORT
119/2019
Permit to Drill
2180290 Well Name/No. PRUDHOE BAY UNIT 11-23B
Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21610-02-00
MD
15157
TVD 8618 Completion Dale 5/19/2018
Completion Status 1-0I1- Current Status 1 -OIL UIC No
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-23B
PB1_BHGE_LTK_2MD_Memory Drilling_Log.pdf
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-23B
PB1_BHGE_LTK_5MD_Memory Ddiling_Log.pdf
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-23B
PB1_BHGE_LTK_5TVDss_Memory
Drilling_Log.pdf
ED
C
29528 Digital Data
711212018
Electronic File: 11-
23BPB1_BHGE_OTK(8.50)_Runo2_2MD_Madpa
ss—MEM — 6343-6478 — Log.pdf
ED
C
29528 Digital Data
7/12/2018
ElectronicFile: 11-
23BPB1_BHGE_ OTK(8.50)_Run02_2TVDSS_Ma
dpass_MEM _4768-4848_Log.pdf
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-
23BPB1_BHGE_ OTK(8.50)_Run02_5MD_Mediae
ss—MEM 6343-6478—Log.pdf
ED -
C
29528 Digital Data
7/12/2018
Electronic File: 11-
23BPB1_BHGE_OTK(8.50)_Run02_5TVDSS_Ma
dpass_MEM _4768-4848_Log.pdf
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-23BPB1_BHGE_Final Survey
Report.pdf
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-23BPB1_BHGE_Final Survey
Report.txt
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-
23BPB 1 _BHG E_ FinalSurveys.csv
ED
C
29528 Digital Data
7/12/2018
Electronic File: 11-
238 P B 1 _B H G E _Fi n a l S u rveys. xl s
Well Cores/Samples Information:
Sample
Interval
Set
Name
Start Stop
Sent Received Number
Comments
INFORMATION RECEIVED
AOGCC Pagc 4 of Wednesday, January 9, 2019
DATA SUBMITTAL COMPLIANCE REPORT
1/912019
Permit to Drill 2180290 Well Name/No. PRUDHOE BAY UNIT 11-23B
Operator BP EXPLORATION (ALASKA) INC.
API No. 50-029-21610-02-00
MD 15157 TVD 8618
Completion Date 5/19/2018 Completion Status 1 -OIL Current Status 1 -OIL
LIC No
Completion Report 0
Directional / Inclination Data O
Mud Logs, Image Files, Digital Data Y /6
Core Chips Y /
Production Test Information Y /®
Mechanical Integrity Test Information Y/ NA
Composite Logs, Image, Data Files 0
Core Photographs Y /�
Geologic Markers/Tops O
Daily Operations Summary 0
Cuttings Samples Y / l-/
Laboratory Analyses Y /' V
COMPLIANCE HISTORY
Completion Date: 5/19/2018
Release Date: 3/28/2018
Description
Comments:
Compliance Reviewed By:
Date Comments
Date: lh l i I
AOGCC Page 5 of 5 Wednesday, January 9, 2019
Martin, Teddy J (DOA)
From: Lastufka, Joseph N <Joseph.Lastufka@bp.com>
Sent: Tuesday, July 24, 2018 3:18 PM
To: AOGCC Reporting (DOA sponsored)
Subject: POP PBU 11-23B / PTD # 218-029
Hello,
Please reference the following well:
Well Name: PBU 11-23B
Permit #: 218-029
API #: 50-029-21610-02-00
Date of Test: 6118118
Type of Test: IPT (Initial Production Test)
Choke Size: 90
Choke Unit:
Production Method: Gas Lift
Duration (Hours Tested): 12
Top Reference (Top Perf MD): 11630'
Bottom Reference (Bottom Pert MD): 14885'
Tubing Flowing (Pressure): 186
Casing Pressure: 930
Total Test Rate (O, G, W): 586 / 850 / 129
24 -Hour Rate (O, G, W): 1171 / 1700 / 258
Gravity (Oil, API): N/A
GOR (Gas -Oil Ratio): 1452
This well began Production on
Method of Operations on this date: June 16, 2018
RBDMS�,.UG 0 6 2018
BAF�UGHES ER
® PRINT DISTRIBUTION LIST
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME 11-23B
FIELD
Prudhoe Bay Unit
CD/DVDFINAL
COUNTY
PRUDHOE BAY
PRELIM
BHI DISTRICT
Alaska
SURVEY
AUTHORIZED BY
Paul Canizares
EMAIL
Paul. Can izares@bhoe.com
218029
29 52 7
ase sign and return one copy of this transmittal form to:
Exploration (Alaska) Inc.
:rotechnical Data Center, LR2-1
) E. Benson Blvd. Anchorage, Alaska 99508 or
LOG TYPE GR-RES-DEN-NEU
LOG DATE May 16, 2018
TODAYS DATE July 11. 2018
Revision
STATUS Final Replacement: No Details:
Rev. Requested by:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
4
t BP North Slope.
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aides
Attn: Benda Glnssmaker & Peggy O'Neil
900 E. Benson Blvd.
Anchorage, Alaska 995M
2 ConocoPhillipe Alaska Inc.
Attn: Ricky Elgarico
ATO 3-J4<
700 G Street
Anchorage. AK 99510
3
Lynda M. Vaskell and/or Lisa Boggs
C Street, Suite 505
forage. AK 99503
e of Alaska - AOGCC
I: Natural Resources Technitian
W. 7th Ave, Suite 100
horage, Alaska 99501
2 - Division of Oil & Gas
I: Garret Brown
West 7th Avenue, Suite 1100
horaee. Alaska 99501
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
FIELDI
FINAL
CD/DVDFINAL
PRELIM
LOGS
I
(las, dlis, PDF, META,
I
SURVEY
REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTS
# OF COPIES
# OF COPIES
# OF COPIES
0
1
Com]
AOGCC
TOTALS FOR THIS PAGE: 0 0 4 0 0
BAjCER 0PRINT DISTRIBUTION LIST
29528
Ise sign and return one copy of this transmittal form to:
Exploration (Alaska)Inc.
rotechnical Data Center, LR2-1
) E. Benson Blvd. Anchorage, Alaska 99508 or
LOG TYPE GR-RES-DEN-NEU
LOG DATE May 11, 2018
TODAYS DATE July 11, 2018
Revision
STATUS Final Replacement: No Details:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
I BP North Slope.
EOA, PROC, PRB-20 (Office 109)
D&C Wells Project Aides
Aft: Benda Glassmnkcr & Peggy O'Neil
900 E. Benson Blvu.
Anchorage, Alaska 99508
Rev. Requested by:
FIELD/ FINALCD/DVD
UGHES
1
PRELIM LOGS (las, tills, PDF, META,
a GE company
REPORT
COMPANY BP Exploration Alaska Inc.
WELL NAME
11-23BPB1
# OF PRINTS # OF COPIES
FIELD
Prudhoe Bay Unit
700 G Street
COUNTY
PRUDHOE BAY
BHI DISTRICT
Alaska
AUTHORIZED BY
Paul Canizares
EMAIL PauLCangar�om
29528
Ise sign and return one copy of this transmittal form to:
Exploration (Alaska)Inc.
rotechnical Data Center, LR2-1
) E. Benson Blvd. Anchorage, Alaska 99508 or
LOG TYPE GR-RES-DEN-NEU
LOG DATE May 11, 2018
TODAYS DATE July 11, 2018
Revision
STATUS Final Replacement: No Details:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
I BP North Slope.
EOA, PROC, PRB-20 (Office 109)
D&C Wells Project Aides
Aft: Benda Glassmnkcr & Peggy O'Neil
900 E. Benson Blvu.
Anchorage, Alaska 99508
Rev. Requested by:
FIELD/ FINALCD/DVD
FINAL
1
PRELIM LOGS (las, tills, PDF, META,
SURVEY
REPORT
LOGS CGM, Final Surveys)
(Compass)
ATO 3-344
# OF PRINTS # OF COPIES
# OF COPIES
# OF COPIES
4 IG 4 4 4 4
2 ComanPhillips Alaska Inc.
0 0
1
0 0
Attn: Ricky Elgarico
ATO 3-344
700 G Street
Anchorage, AK 99510
RECEIVED
3 ExxonMobil, Alaska
0 0
i0
0
Attn: Lynda M. Yaskell and/or Lisa Boggs
3201 C Street, Suite 505
AO G C C
Anchorage, AK 99503
4 State of Alaska -AOGCC
0 0
1
0 0
Attn: Natural Resources Technician
333 W. 7th Ave, Suite 100
Anchoraee, Alaska 99501
DNR - Division of Oil & Gas ***
Attn: Garret Brown
550 West 7fh Avenue. Suite 1100
Anchorage, Alaska 99501
*** Stamo "confidential" on all material deliver to DNR
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
TOTALS FOR THIS PAGE: 0 0 4 0 0
STATE OF ALASKA
LASKA OIL AND GAS CONSERVATION COMMIS( I
WELL . JMPLETION OR RECOMPLETION REPOK. AND LOG
RECEIVED
la. Well Status: Oil 0 . Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
Well Class. -
20AAC 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One
11b.
Development 0 Exploratory❑
Service ❑ Stratigraphic Test ❑
2. Operator Name:
6. Date Comp., Susp., or Abend.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
5/19/2016
216-029 '
3. Address:
T Date Spudded:
15. API Number
P.O. Box 196612 Anchorage, AK 99519-6612
4/30/2018
50-029-21610-02-00 -
4a. Location of Well (Governmental Section):
8. Date TD Reached.
16- Well Name and Number:
5/15/2018
PBU 11.238
Surface', 1096' FSL, 364' FEL, See. 28, T11 N, R15E, UM
9 Ret Elevations KB 74 60
17. Field/Pool(s):
Top of Productive Interval: 1655FSL, 3188' FEL, Sec. 21, T11 N, R15E, UM
GL 27.90 ' BF 28.45
PRUDHOE BAY, PRUDHOE OIL
10. Plug Back Depth(MD/TVD):
18. Property Designation
Total Depth: 5206' FSL, 4292' FEL, See. 21, T11N, R15E, UM
• 15063'/ 8640'
ADL 028325 8 028322
4b, 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11. Total Depth (MD/TVD):
19. DNR Approval Number:
Surface: x- 707156 • y- 5952811 Zone - ASP 4
. 15157'/ 8618'
70-054
TPI: x- 704180 y- 5958570 Zone - ASP 4
12. SSSV Depth (MDfTVD):
PO Thickness of Permafrost MD/rVD:
Total Depth: x- 702951 y- 5962089 Zone - ASP 4
None
1900' Approx.)
S. Directional or Inclination Survey: Yes 0 (attached) No ❑
13. Water Depth, if Offshore:
21_ Re-drillll-aterel Top Wndow
Submit electronic and printed information per 20 AAC 25.050
N/A (ft MSL)
MD/TVD:
- 6443'/ 4902'
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, rasing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MWD/GR/RES, MWD /GR/RES /DEN /NEU
23. CASING, LINER AND CEMENTING RECORD
CASING
I WT, PER I
FT.
GRADE
SETTING DEPTH MD
SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
AMOUNT
PULLED
TOP
BOTTOM
TOP BOTTOM
20"
91.5#
H40
48'
128'
48' 128'
30"
1450# Poleset
13-3/8"
68#/72#
K -55L-90
48'
2780'
48' 2512'
17-1/2"
3200 sx CS Ill, 900 sx CS II
9-5/8"
47#
L-60
46'
6443'
46' 4902'
12-1/4"
500 sx Class'G', 300 sx CS 1
7"
26#
L-90
6286'
10615'
4810' 8314'
&1/2"x9-7/8"
488 sx Class'G'
4-1/2"
12.6#
13Ci85
10441'
15155'
8164' 8618'
6-1/8"
552 sx Class 'G'
24. Open to production or injection? Yes 0 . No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
GRADE DEPTH SET (MD) PACKER SET (MD/TV
4-1/2" 12.6# 13Cr85 10446' 10327'/ 8088'
2-3/4" Gun Diameter, 6 spf 5/18/2018
11630'-12100' 8775'-8767'
26, ACID, FRACTURE, CEMENT SQUEEZE, ETC.
12200'- 12500' 8765'- 8752'
Was hydraulicfmctunng used during completion? Yes ❑ No 0
Per 20 AAC 25.263 (i)(2) attach electronic and printed
information13970'
12520'-12680' 8751'-8744' COMPLETION
12700'- 13050' 8743' - 8731'
13200'- 13840' 8726' - 8705' D TE �j
- 14630' 8700'- 8674'
DEPTH INTERVAL (MDI AMOUNT AND KIND OF MATERIAL USED
14760' - 14885' 8669' - 8883' VE IED
2200' Freeze Protect w/ 151 Bbls Diesel
27, PRODUCTION TEST
Date First Production: Nol on Production
Method of Operation (Flowing, gas lift. etc): N/A
Date of Test:
Hours Tested:
Production for
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Choke S've
Gas -Oil Ratio:
Test Period
Flow Tubing
Press
Casino Press:
Calculated
24 Hour Rate —110
Oil -Bbl:
Gas -MCF:
Wader -Bbl:
Oil Gravity - API foom):
Foam 10107 Revised! 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only
ROMM JUN T-9 Z018 M&,J?69jV8VVF
/11
28. CORE DATA I Conventional Corals) Yes ❑ No 0 ( Sidewall Cores Yes ❑ No 0
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS
NAME
MD
TVD
Permafrost - Top
Well Tested? Yes ❑ No 0 '
Permafrost - Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
11315'
8741' separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071,
Ugnu
6511'
4944'
West Bak
8256'
6332'
Colville Mudstone
8776'
6767'
HRZ
10377'
8109'
LCU / Shublik
10614'
8313'
Sadlerochit - Zone 4B
10639'
8334'
42SB-Zone 4A
10721'
8403'
CGL - Zone 3
10804'
8468'
Base of CGL - Zone 2C
10862'
8510'
23SB - Zone 2B
10990'
8595'
21TS - Zone 2A
11113'
8662'
Zone 1 B
11238'
8716'
TDF - Zone 1A
11315'
8741'
Zone 1B (Invert)
15115'
8628'
Formation at total depth:
Zone 1B (From Base)
15115'
8628-
31. List of Attachments: LOT / FIT Summary, Summary of Daily Drilling Reports, Surveys, Cement Reports, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070,
32. 1 hereby certify that the foregoing is true and comect to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Gorham, Bradley M
Authorized Title: SIM S tial Contact Email: Bradley. Gorham@bp.com
Authorized Signature:% Date: I Contact Phone: 907-564-4649
IN RUCTIONS
General: This form is designetl for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed desorption and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production orwell test results.
Form 10407 Revised 5/2017 Submit ORIGINAL Only
TRS= McEVOY
VWELL EAD=
CNV
ACTUATOR=
---- BKRC
OKB. —
57-
TREF
REFB -EV =
74.80'
BF. ELEV =
28.46
KOP=
1100'
Max Angle =
-------._
107'@ 15157'
DatxmMD=
_..._----
10639'
Datwn TVD=
825W SS
13-3/8" CSG, 728, L-80, D = 12.347' 2763'
Minimum ID = 3.725" @ 10430'
4-1/2" HES X NIPPLE
JTOPOF4-1/2"LHRH 10441'
2' TBG, 12.60, 13CR-85 VAM TOP.10446'
52 bpf, D = 3.958"
7" LNR, 264, L-80 VAIVTOP FrBTC-M, 10615'
.0383 bpf, D = 6276"
PERFORATION SLRAAARY
REF LOG: BKR DWING MWD ON 05/16/18
ANGLEAT TOP PEW 92" 1'Q 11630'
Note: %far b Production DB for historical perf data
SIZE
SIFF
KrERVAL
Opn/Sgz
SHOT
SOZ
2-314'
6
11630-12100
O
05/18/18
BW
2-314"
6
122OD- 12500
O
05/18/18
42
2-3/4"
6
12520-12680
O
05/18/18
4
2.9/4"
6
12700-13050
O
05/18/18
BK
2-314"
6
13200- 13840
O
05/18/18
33
2-3/4"
6
13970 - 14630
O
05/18/18
2
2314"
6
14760- 14885
O
05/18/18
BK
air.
bpf, D = 3.958-
11-23B
[SAFETY NOTES: WELL ANGLE> 70° @ 11250'. MAX
DL.S:1T @ 11502'.—CHROMETBG 8 LNR"'
(4-1/2"HES X NP, D=3.813" I
ST
MD
TVD
DEV
TYPE
VLV
LATCH
I PORT
DATE
6
4413
3573
50
KBG2
SHEAR
BW
-
05119118
5
6891
5213
42
KBG-2
DMV
BK
0
05/19/18
4
7755
5915
34
KBG-2
Dk1V
BK
0
05/19/18
3
8287
6358
33
KBG-2
Dk1V
BK
0
05119118
2
9276
7185
33
KBG-2
OMY
BK
0
05119/18
1
10140
7908
33
KBG-2
DMV
BK
0
05/19/18
X 7' WFD UP w
CGP, D = 6.19"
IMMLOIlTVwmw(1/-238) 6443'-6457'
10327' I -j7" X 4-1/2" HES TNT PKP D-3.856"
10361" 4-112" FES X NP, D = 3.813'
10430' 4-12" FES XN NP, —ID—= -3-72-5--1
10441' 7"X5'WFDLTPwrrEBACK SLEEVE&
VVFD HGP, D = 4.330-
110416' H4-1/2" WLEG, 10 = 3.958"
10461' 5" X 4-12" XO. D = 3.934-
DATE
REV BY
COLU31ITS
DATE REV 8Y COMMENTS
1986
ORIGINAL COMPLETION
10/15/95CT
SIDETRACK
0 5120118
P-272
SIDEfRACK(11-238)
05!21118
JMD
I DRLG HO CORRECTIONS
0521!18
BG/JMD
IFINIALODEAPPROVAL
PRUDHOE BAY UPIT
WELL: 11-23B
PEFUT No: '218-029
AR W: 50-029-21610-02
T11 K R15E 1096' FSL & 364' FEL
BP Exploration (Alaska)
BP AMERICA
LOT / FIT Summary
Well Name: 11-23BPB1
Surface
Leak Off
Test Test Test Depth Test Depth AMW
Pressure
Pressure EMW
Date Type (TMD -Ft) (TVD -Ft) (ppg)
(psi)
(BHP) (psi) (ppg)
05/01/18 FIT 6,443.45 4,901.45 9.80
730.00
3,225.06 1267
Page 1 of 1
Page 1 of 1
BP AMERICA
LOT / FIT Summary
Well Name: 11-23B
Surface
Leak Off
Test Test Test Depth
Test Depth AMW
Pressure
Pressure EMW
Date Type (TMD-Ft)
(TVD-Ft) (pp)
(psi)
(BHP) (psi) (ppg)
05/09/18 FIT 10,615.45
8,314.45 8.50
650.00
4,321.32 10.00
Page 1 of 1
North America - ALASKA - Blo Page 1 of 31
Operation Summary Report
Common Well Name'. 11-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/2412018 End Date: 5/16/2018
X3 -018Y4 -C. (6,086,993.00)
Project: PBU Site: 11
Rig Name/No.: PARKER 272 Spud Date/Tlme: 7/11/1986 12:00:OOAM
Rig Release: 5/20/2018
Rig Contractor. PARKER DRILLING CO.
SPUOI: USA00001229
Active datum: 11-23B Actual @j74.60usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase Description of Operations
_ (hr) _ _ (usft)
4/24/2018 00:00 - 01:00 1.00 MOB P 0.45 PRE BEGIN RE-ENTRY EVENT WITH PARKER RIG
272 AT 00:00 ON 4/24/18
4/26/2018 00:00 - 02:00 2.00 MOB N
RIG PROJECTS
- REPLACEACTIVE HEADER IN PIT ROOM
WITH FLANGED STYLE FOR EASY SECTION
REPLACEMENT IN FUTURE
- CHANGE UPPER RAMS FROM SMALL VBRS
TO LARGE VBRS FOR 11-238 PROGRAM
- PREVENTATIVE MAINTENANCE, CLEANING
AND PAINTING AROUND RIG
0.45 PRE RIG STAGED ON DS04 ACCESS ROAD WHILE
WAITING ON COMPLETION OF 11-23
WELUPRE-RIG WORK
- LEVEL PAD FOR RIG FOOTPRINT
- TOTAL OF 44 HOURS WAITING FOR PRE -RIG
WELLAND PAD PREP
- WARMUP TIRES AND MOVING SYSTEM
Printed 6/7/2018 4:43:50PM *All depths reported in Drillers Depths'
GENERAL RIG DOWN OPERATIONS ON 04-51
THROUGHOUT RIG
- RIG DOWN RIG FLOOR, SECURE TOP
DRIVE, BRIDLE UP
01:00
- 01:30
0.50
MOB
P
0.45
PRE
MOVE HAUNCH TO STORAGE POSITION AND
SKID RIG FLOOR TO RIG MOVE POSITION
01:30
- 02:30
1.00
MOB
P
045
PRE
LOWER DERRICK TO HEADACHE RACK -404
KLBS
02:30
- 0330
1.00
MOB
P
0.45
PRE
CONTINUE RIG DOWN OPERATIONS
THROUGHOUT RIG
RIG DOWN ALL INNER -CONNECTS
UNPLUG ELECTRICAL INNER -CONNECTS
_
WARM UP TIRES
0330
- 0600
2.50
MOB
P
0.45
PRE
MOVE RIG TO DS11
- SPLIT MODULES AND PULL OFF DS04-51
- MOVE RIG DOWN DS04 ACCESS ROAD
- STAGE RIG ON DS04 ACCESS ROAD WHILE
WAITING ON COMPLETION OF 11-23
WELUPRE-RIG WORK
0600
- 0000
18.00
MOB
N
0.45
PRE
RIG STAGED ON DS04 ACCESS ROAD WHILE
.
WAITING ON COMPLETION OF 11-23
WELUPRE-RIG WORK
-OPS AND WELLS GROUP WORKING TO
COMPLETE DISCONNECT OF FLOWUNE,
PULL NEIGHBOR WELLHOUSE HANDRAILS,
INSTALL FLOORING KIT, LEVEL PAD FOR RIG
FOOTPRINT _
4/25/2018 0000
- 0000
24.00
MOB
N
0.45
PRE
RIG STAGED ON DS04 ACCESS ROAD WHILE
WAITING ON COMPLETION OF 11-23
WELUPRE-RIG WORK
- OPS AND WELLS GROUP WORKING TO
COMPLETE DISCONNECT OF FLOWLINE,
PULL NEIGHBOR WELLHOUSE HANDRAILS,
INSTALL FLOORING KIT, LEVEL PAD FOR RIG
FOOTPRINT
4/26/2018 00:00 - 02:00 2.00 MOB N
RIG PROJECTS
- REPLACEACTIVE HEADER IN PIT ROOM
WITH FLANGED STYLE FOR EASY SECTION
REPLACEMENT IN FUTURE
- CHANGE UPPER RAMS FROM SMALL VBRS
TO LARGE VBRS FOR 11-238 PROGRAM
- PREVENTATIVE MAINTENANCE, CLEANING
AND PAINTING AROUND RIG
0.45 PRE RIG STAGED ON DS04 ACCESS ROAD WHILE
WAITING ON COMPLETION OF 11-23
WELUPRE-RIG WORK
- LEVEL PAD FOR RIG FOOTPRINT
- TOTAL OF 44 HOURS WAITING FOR PRE -RIG
WELLAND PAD PREP
- WARMUP TIRES AND MOVING SYSTEM
Printed 6/7/2018 4:43:50PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 11-23
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 424/2018 End Date: 5/16/2018
Project: PBU site, 11
Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 12:00:OOAM
Rig Contractor: PARKER DRILLING CO.
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Page 2 of 31
AFE No
X3 -018Y4 -C: (6,086 993,00 )
Rig Release: 5/202018
BPUOI: USA00001229
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) _ lush) i _
0200 - 0500 3.00 MOB P 045 PREOMVE ALL MODULES FROM DSO4 ACCESS
Printed 60/2018 4:43:50PM `All depths reported in Drillers Depths'
ROAD TO DS11
- TOTAL RIG MOVE LENGTH = -3 MILES
- SIMOPS: RIG LOADER PLACING RIG MATS
AND SET WELLHOUSE OVER WELL
-MOVE MODULES INDIVIDUALLY AROUND
FS2 WITH CENTRAL POWER STATION
SPOTTERS
05:00 - 0700 2.00 MOB P
0.45 PRE
SPOT DRILL MODULE OVER WELL 23. MATE
MUD MODULE AND UTILITY MODULE UP
AGAINST DRILL MODULE
- SHIM AND SECURE MODULES
07.00 - 0900 2.00 MOB P
045 PRE
GENERAL RIG UP OPERATIONS
THROUGHOUT RIG
-RIG UP INTERCONNECTS
- COMPLETE CHECKLIST FOR RAISING MAST
- WELLS SUPPORT CREW ON LOCATION TO
SPOT FLOWBACKTANKAND RIG UP
HARDLINE FROM TANK TO WELLHOUSE
-SPOT CUTTING_ _S BOX_
0900 - 0930 0.50 MOB P
0.45 PRE
RAISE MAST
-540 KLBS OFF HEADACHE RACK
09:30 - 11:00 1.50 MOB P
0.45 PRE
SKID RIG FLOOR INTO DRILLING POSITION.
. POSITION CATTLE CHUTE. RAISE PIPE CAT
- MONITOR TREE FOR PRESSURE BUILDUP
ABOVE TWC AFTER HEATERS HAVE BEEN
ACTIVATED IN WELLHOUSE
PERFORM RIG BLACKOUT TEST (PASS)
11:00 - 15:30 4.50 MOB P
0.45 PRE
GENERAL RIG UP OPERATIONS
- RIG UP RIG FLOOR, MODULE ROOFS, &
INTERCONNECTS
- BRIDLE DOWN, RIG UP BLOCKS AND TOP
DRIVE, CALIBRATE BLOCKS
- OUADCO REP ON LOCATION TO CALIBRATE
PVT, FLOW SENSORS AND GASWATCH
- FILL IA WITH 5 BBLS 6.8 PPG DIESEL FROM
FREEZE PROTECT TANK. ESTABLISH
BEGINNING OF MONITORING PERIOD TO
ESTABLISH KWF ASA NIPPLE DOWN
BARRIER AT 15:30. MAINTAIN CONTINUOUS
HOLE FILL WITH GRAVITY FEED FROM 250
BELS DIESEL LOADED IN FLOWBACK TANK.
MONITOR GAINSILOSSES USING TOTCO
SENSOR AND MANUAL TANK STRAPS EVERY
1/2 HOUR
- PERFORM RIG READINESS WALKAROUND
Printed 60/2018 4:43:50PM `All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 3 of 31
Common Well Name: 11-23 AFE No
Event Type. RE-ENTER- ONSHORE (RON) Start Date 4/24/2018 End Date'. 5/16/2018 X3 -018Y4 -C: (6,086,993.00 )
Project: PBU Site: 11
Rig Name/No.: PARKER 272 Spud Date/Time'. 7/11/1986 12:00 OOAM Rig Release: 5/20/2018
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To Hrs Task
i (hr)
15:30 - 23:30 8.00 RIGU
23:30 - 0000 0.50
4/27/2018 0000 - 0300 3.00
0300 - 06:00 3.00
06 00 - 07:30 1.50
Code NPT i Total Depth
N 0.45
RIGU P 045
RIGU P 0.45
RIGU P 0.45
BOPSUR P 0.45
BPUOI: USA00001229
Phase Description of Operations
PRE MONITOR IA WITH CONTINUOUS DIESEL
HOLE FILL
- CODED AS NON-PRODUCTIVE TIME,
BECAUSE EXTRA BARRIER TESTING AND
ESTABLISHMENT WORK REQUIRED
FOLLOWING LAST MINUTE WELL PREP
- OCN #1 REQUIRES MONITOR KWF FOR 3X
EXPECTED TIME TO NIPPLE DOWN TREE AND
NIPPLE UP ROPE (12 TOTAL MONITORING
HOURS)
�- NO GAINS/LOSSES OBSERVED IN
FLOWBACK TANK INDICATING IA FLUID
REMAINING LEVELAT WELLHEAD
SIMOPS:
- CHANGEOUT SAVER SUB TO 5" AND
CHANGE IBOP (TO REPLACE FAILED
STRINGSENSE)
- PICKUP 5" DRILLPIPE WITH OFFLINE
EQUIPMENT
- PRESSURE TEST TWC FROM BELOW WITH
DIESEL TO 3500 PSI HIGH FOR 5 MIN (PASS),
NO PRESSURE OBSERVED ON THE OA
DURING TEST
HOLD TABLE TOP RIG EVACUATION DRILL
AND AAR WITH WOODS' CREW + PRE -SPUD
MEETING
- HOLD PRESPUD WITH LYLE BUCKLER'S
CREW DURING PRETOUR MEETING
PRE PREPARE TO NIPPLE DOWN TREE
-SUCK OUT TREE
- GATHER TOOLS AND EQUIPMENT
PRE NIPPLE DOWN TREE
- BLEED OFF HANGER VOID AND CONTROL
LINES
- BREAK BOLTS AND REMOVE TREE
-CLEAN HANGER AND INSPECT THREADS,
INSTALL CROSSOVER WITH 9-3/4 TURNS
- TERMINATE CONTROL LINES
-
FUNCTION _ALL _LOCK DOWN SCREWS
PRE NIPPLE UP 13-5/8" HIGH PRESSURE RISER
AND BOP STACK
- ANNULAR, 4-1/2" X 7" VBR IN UPPER RAMS,
BLIND/SHEAR RAMS IN MIDDLE RAMS, MUD
CROSS, 2-7/8" X 5" VBR IN LOWER RAMS
- TORQUE FLANGES TO SPEC
-SECURE WITH TURNBUCKLES
- INSTALL FLOW LINE AND FLOW NIPPLE
PRE RIG UP TO TEST ROPE
- MAKE UP TEST JOINTS AND TEST
MANIFOLD ON RIG FLOOR
Printed 6/7/2018 4:43:5OPM *All depths reported in Drillers Depths"
Common Well Name. 11-23
Event Type. RE-ENTER- ONSHORE (RON)
Project: PBU
Rig Name/No.: PARKER 272
North America - ALASKA- BP
Page 4 of 31
Operation Summary Report
AFE No
Start Date. 4/24/2018 End Date: 5/16/2018 X3 -018Y4 -C (6,086,993.00)
Site: 11
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To Him Task Code NPT
(hr)
07:30 - 18:30 11.00 BOPSUR P
1830 - 2200 3.50 WHSUR P
2200
- 2230
0.50
CASING P
22:30
- 00:00
1.50
CASING P
I I
4/28/2018 0090
- 02'.30
2.50
CASING P
02.30 - 03'.30 1.00 CASING P
03:30 - 05:00
1.50
CASING P
0500 - 0600 1.00
CASING P
BPUOI: USA00001229
Total Depth
Phase Description of Operations
_ (usft)
0.45
PRE PRESSURE/FUNCTION TEST BOPE TO 250
PSI LOW AND 3500 PSI FOR 5 MIN EACH
- TEST WITH 4',5' AND 7" TEST JOINTS
- 1 FAILURE, VALVE 15 ON THE CHOKE
MANIFOLD, REBUILD VALVE ON RIG AND
RETEST (FAILED), CHANGE OUT VALVE AND
RETEST(PASS)
- TEST LEL, 112S, PVT AND FLOW SHOW
ALARMS
-ALL TESTS CHARTED, SEE ATTACHED BOP
TEST CHARTS
- TEST WITNESS WAIVED BY AOGCC REP
BRIAN BIXBY
6,452.45
PRE PULLTWC
- PICK UP AND SET DUTCH RISER
- RIG UP LUBRICATOR AND TEST TO 250 PSI
LOW AND 3500 PSI HIGH FOR 5 MIN
-PULL TWC
_
- RIG DOWN AND LAY DOWN LUBRICATOR
6,452.45
DECOMP SERVICETOPDRIVE
6,452.45
DECOMP RIG UP TO CIRCULATE OUT DIESEL
- PRESSURE TEST SURFACE LINES,
OBSERVE MULTIPLE LEAKS AT VALVES AND
HOSES IN SURFACE LINES
- REPAIR VALVES AND HOSE CONNECTIONS
ON SURFACE LINES
6,45245
DECOMP CIRCULATE OUT DIESEL FREEZE PROTECT
AND DISPLACE WELL TO NEW 9.8 PPG BRINE
- PRESSURE TEST SURFACE LINES TO 4500
PSI HIGH (PASS)
- PUMP 40 BBL BARACLEAN PILL FOLLOWED
BY 460 BBL OF 9.8 PPG BRINE AT 120° F
- 6 - 7 BPM, 800 - 1000 PSI, 120 - 150 PSI ON
HARDLINE OUT TO TIGER TANK (TRACK BBL
IN/OUT)
SIMOPS:
- RIG UP DOYON CASING EQUIPMENT
- RIG UP SLB CONTROL LINE SPOOLER
6452.45
DECOMP PULL TUBING HANGER TO RIG FLOOR
- MAKE UP CROSSOVER TO LANDING JOINT,
RUN IN THE HOLE AND SCREW INTO THE
TUBING HANGER
- CAMERON REP ON LOCATION TO BACKOUT
LOCK DOWN SCREWS
-104 KLBS TO PULL HANGER OFF SEAT AND
PULL TO RIG FLOOR (AS CALCULATED, NO
OVERPULL)
8,452.45
DECOMP CIRCULATE BOTTOMS UP
- CHANGE OUT O-RING IN VIBRATING HOSE
TO RIG FLOOR AT START OF CIRCULATING
- 640 GPM, 775 PSI
-MONITOR WELL FOR 10 MIN (STATIC)
6,452.45
DECOMP COMPLETE RIG UP TO LAYDOWN TUBING
WITH DOYON CASINGAND SLB SPOOLERS
- MAKE UP FOSV CROSSOVER, HOLD PJSM
- CIRCULATION OVER TOP OF WELL
CONFIRM 9.8PPG FLUID COLUMN IS STATIC
Panted 6/7/2018 4.43:5oPM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 5 of 31
Common Well Name: 11-23
CUT AT 6452' MD TO 6077' MD (6 JOINTS)
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date'. 4/24/2018
End Date'. 5/1612018
X3 -018Y4 -C: (6,086,993.00 )
Project: PBU
Site: 11
SUGGESTING BANDS ARE NO LONG
Rig Name/No.: PARKER 272
Spud Date/Time. 7/11/1986 12.00:OOAM
Rig Release: 512012018
Rig Contractor. PARKER DRILLING CO.
WITH TUGGER AND NYLON STRAPS. SLB
BPUOI: USA00001229
Active datum: 11-23B Actual @74.60us8 (above Mean Sea Level)
TO SPOOL UP LINES
Date From - To Him
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
_ _
(usfl) .
LINES INDIVIDUALLY FROM TUBING
06:00 - 07:30 1.50
CASING P
6,452.45 DECOMP
LAY DOWN 4-1/2", 12.6#, NSCT TUBING FROM
07:30 - 09:00 1.50 CASING N
0900 - 1900 10.00 CASING P
19.00 - 21.00 2.00 CASING P
21.00 - 00'.00 3.00 CASING P
4/29/2018 00:00 - 0230 2.50 CASING P
Printed 6(7/2018 443'.50PM 'All depths reported in Drillers Depths"
CUT AT 6452' MD TO 6077' MD (6 JOINTS)
- REMOVE ONE SS BAND PER JOINT ON
FIRST 8 JOINTS, NO CLAMPS
- ON STH JOINT, WEIGHT OF DUAL CONTROL
LINES IS OBSERVED TO SAG DOWNHOLE
SUGGESTING BANDS ARE NO LONG
SECURING CONTROL LINES TO TUBING
- UNSUCCESSFULLY ATTEMPT TO PULL LINES
WITH TUGGER AND NYLON STRAPS. SLB
SPOOLING UNIT NOT POWERFUL ENOUGH
TO SPOOL UP LINES
6.45245 DECOMP
RIG UP CONTROL LINE PULLERS ON TUGGER
LINES AND HOLD PRE -JOB SAFETY MEETING
WITH RIG TEAM FOR PULLING CONTROL
LINES INDIVIDUALLY FROM TUBING
-HOLD STOP THE JOB DRILL WITH YEAROUT
CREW (5X5) AFTER PULLING FIRST JOINT
WITH NEW RIGUP TO REVIEW JOB PLANNING
6452.45 DECOMP
LAY DOWN 4-1/2", 12.6#, NSCT TUBING JOINT
8 AT 6077' MD TO SURFACE
- PULLING SPEED DURING CONTROL LINES=
150 FPM, STRAIGHT PIPE = 265 FPM
- ALL OLD COMPLETION EQUIPMENT TESTED
FOR NORM PRIOR TO LEAVING LOCATION
(TUBING - POSITIVE, CONTROL LINE -
POSITIVE)
SUMMARY OF EQUIPMENT RECOVERED:
- (162) FULL JOINTS
- (1) TUBING HAGER WITH 2' XO PUP AND 2'
SPACEOUT PUP
- DUAL CONTROL LINES TO HES SVLN AT
2184' IN ORIGINAL COMPLETION
- (50) TOTAL STAINLESS STEEL BANDS (4)
POTENTIALLY LEFT DOWNHOLE IF
ORIGINALLY INSTALLED WITH 1 PER JOINT
(ORIGINAL RECORDS ARE UNCLEAR)
- (1) GLM ASSY WITH 10' HANDLING PUPS, (1)
SVLN ASSY WITH 10' HANDLING PUPS
- (1) CUT JOINT, 9.95, FLARE OD = 4-15/16",
CUT CONDITION = GOOD
645245 DECOMP
RIG DOWN CASING EQUIPMENT
- CLEAN AND CLEAR RIG FLOOR
- REMOVE BANDS FROM FLOW BOX
- INSTALL WEAR BUSHING (ID = 9-1/8")
645245 DECOMP
MAKEUPAND RUN IN THE HOLE WITH HES
9-5/8", 47# EZSV PER HES REP ON 5" WIRED
DRILL PIPE TO 1904' MD AT MIDNIGHT
- RUNNING SPEED = 90 FPM PER HES
- SINGLE IN ON 5" DP
6,472.45 DECOMP
RUN IN THE HOLE WITH HES 9-5/8", 47# EZSV
PER HES REP ON 5" WIRED DRILL PIPE FROM
1904' MD TO TAG TUBING STUB AT 6472'
DRILLPIPE MD (2' HIGHER THAN EXPECTED
FROM PRE -RIG MTT LOG). PICKUP 1' TO SET
EZSV V ABOVE TUBING STUB.
- RUNNING SPEED = 90 FPM PER HES
Printed 6(7/2018 443'.50PM 'All depths reported in Drillers Depths"
North America - ALASKA- BP
Operation Summary Report
Page 6 of 31
Common Well Name: 11-23
- PICK UP AND SHEAR OFF WITH 50 KLBS
AFE No
Event Type. RE-ENTER- ONSHORE (RON)
Start Date: 4/24/2018
End Date: 5/16/2018
X3 -018Y4 -C: (6,086,993.00 )
Project: PBU
Site: 11
FOR SETTING WHIPSTOCK AND NOT MILLING
Rig Name/No.: PARKER 272
Spud Date/Time: 7/11/1986 12:00:OOAM
COLLAR)
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
CIRCULATE BOTTOMS UP ON TOP OF THE
BPUOI: USA00001229
Active datum: 11-238 Actual @74.60usft (above Mean Sea Level)
Date From- To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
_
(usR)
02:30 - 03:00 0.50
CASING P
6468,45 DECOMP
SET EZSV WITH 35 TURNS TO THE RIGHT
Printed 6/7/2016 4:43:50PM *All depths reported in Drillers Depths'
- PICK UP AND SHEAR OFF WITH 50 KLBS
OVERPULL
- IOP OF EZSV SET AT 6468' MD (OPTIMAL
FOR SETTING WHIPSTOCK AND NOT MILLING
COLLAR)
03'.00 - 03:30 0.50 CASING P
6,46845 DECOMP
CIRCULATE BOTTOMS UP ON TOP OF THE
EZSV
- 15 BPM, 950 PSI, NO PIPE MOVEMENT
- MUD WEIGHT IN/OUT = 9.8 PPG BRINE
03:30 - 04:30 1.00 CASING P
6,46845 DECOMP
PRESSURE TEST CASING 7O 3500 PSI HIGH
'FOR 30 MIN (PASS)
,- REVIEW PRESSURE CROSSCHECK
CHECKLIST
- TEST APPROVED BY WSUP, SEE ATTACHED
•DOCUMENTS
04.30 - 0700 2.50 CASING P
6,468.45 DECOMP
PULL OUT OF THE HOLE FROM THE TOP OF
THE EZSV AT 6469' MD TO SURFACE.
LAYDOWN EZSV RUNNING TOOL
- LAY DOWN EZSV RUNNING TOOL
-FLOWCHECK WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM (STATIC) _
0700 - 0900 2.00 STWHIP P
6,46845 WEXIT
MAKEUP 9-5/8"SLB ONE -TRIP
TRACKMASTERWHIPSTOCK AND MILLS.
SCRIBE MILLS IN HOLE TO MWD.
- CONFIRM 55 KLBS SHEAR PIN
- FLOWCHECK WELL FOR 10 MIN PRIOR TO
RUNNING IN HOLE (STATIC)
WHILE PICKING UP THROUGH THE
WELLHEAD AND STACK TO CHECK THE
-
MWD -TRAY SCRIBE, THE WHIPSTOCK
CAUGHT ON SOMETHING, LEADING TO AN
INADVERTENT SHEAR OF THE 55 KLBS
SHEAR BOLT BETWEEN THE TRAYAND THE
MILLS. THE WHIPSTOCK FELL DOWNHOLE
AND IS SUSPECTED TO BE SITTING ON THE
EZSVAT 6468' MD.
- ONLY 5 KLBS OVERPULL WAS OBSERVED
ON TOTCO AT 9:03AM TIME OF EVENT.
- AT TIME OF OVERPULL, TOP OF
WHIPSTOCK CORRESPONDS TO LOWER
PIPE RAMS WITH BOTTOM OF WHIPSTOCK
AT WELLHEAD.
Printed 6/7/2016 4:43:50PM *All depths reported in Drillers Depths'
Common Well Name: 11-23
Event Type: RE-ENTER- ONSHORE (RON)
North America -ALASKA - BP
Operation Summary Report
Start Date: 4/24/2018 End Date: 5/16/2018
AFE No
K3 -018Y4 -C.(6,086,993.00)
Page 7 of 31
Project: PBU
Site: 11 -- — -
1.50
FISH
Rig Name/No.: PARKER 272
Spud Date/time: 7/11/1986 12:00.00AM
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
FISH
N
SPUOI: USA00001229
Alive datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To Him
Task Code
NPT Total Depth
Phase Description of Operations
(hr)
(usft)
09:00 - 13:30 4.50
FISH N
6,468.45
WEXIT PREPARE TO FISH WHIPSTOCK
13.30
- 15'.00
1.50
FISH
N
15.00
- 18:30
3.50
FISH
N
18:30 - 1930 1.00 FISH N
1930 - 00.00 4.50 FISH N
4/30/2018 0000 - 01:30 1.50 FISH N
- PICKUP (7) STANDS 5" HWDP WITH OFFLINE
EQUIPMENT
- CALLOUT FISHING JARS
- DEVELOP FISHING PLAN WITH SLB REP
AND OCN #2 FOR WELL WITH ODE
-DRAIN STACK TO CONFIRM NO
OBSTRUCTIONS DOWN TO WELLHEAD
- VISUALLY INSPECT LOWER RAM CAVITY
WITH BORESCOPE (VISUALLY OK)
- PULL WEAR RING AND CONFIRM NO
DAMAGE
- RE -PRESSURE TEST 9-5/8" CASING ,
AGAINST BLIND RAMS TO 3500 PSI FOR 30
WAS NOT COMPROMISED BY DROPPED
WHIPSTOCK (REVIEW PRESSURE
CROSSCHECK, PASS, SEE ATTACHED
CHART)_
6,468.45 WEXIT MAKEUP SLB FISHING ASSEMBLY FROM
SURFACE TO 143'OVERALL LENGTH
- PRIMARY FISHING TOOL =DIE COLLAR
(SIMILAR TO OVERSHOT)
646845 WEXIT TRIP IN THE HOLE WITH SLB WHIPSTOCK
FISHING ASSEMBLY FROM BHA AT 143' MD TO
TAG WHIPSTOCK FISH AT 6426' MD (-19'
! FROM THE TOP OF THE EZSV)
! - 100 FPM RUNNING SPEED IN CASE
WHIPSTOCK DIDN'T FALLTO BOTTOM
- NO WEAR RING INSTALLED TO ENSURE IT
IS NOT A POTENTIAL HANG UP SPOT ON THE
WAY OUT OF THE HOLE
- PU 182 KLBS, SO 138 KLBS, ROT 161
KLBS,10 RPM, 7K TORQUE
fi 468.45 WEXIT ENGAGE WHIPSTOCK WITH DIE COLLAR
-PUSH WHIPSTOCK TO BOTTOM AT 6445'MD
(BOTTOM OF WHIPSTOCK AT 6468' MD) AND
SET DOWN 10K TO TRIP ANCHOR, OBSERVE
GOOD INDICATION OF WHIPSTOCKANCHOR
TRIPPING
- PICK UP AND INITIATE ROTATION AT 10 RPM,
7 KFT-LBS
-SET DOWN 10KAND ROTATEAT 10 RPM,
7-15 KFT-LBS TORQUE TO ENGAGE THE
WHIPSTOCK WITH THE DIE COLLAR
- MONITOR WELL FOR 10 MIN (STATIC)
fi 468.45 WEXIT PULL OUT OF THE HOLE WITH 9-5/8"
WHIPSTOCK FISH ASSEMBLY FROM EZSV AT
6468' MD TO THE TOP OF THE FISHING BHA
AT 143' MD
- PULL AT 45 FPM
- MONITOR WELL FOR 10 MIN AT THE TOP OF
THE BHA (STATIC)
6,46845 WEXIT LAY DOWN WHIPSTOCK FISHING BHA FROM
W, TMD TO SURFACE
OBSERVE 15K OVERPULL PULLING THE
BOTTOM OF THE WHIPSTOCK THROUGH THE
WELLHEAD
- LAY DOWN WHIPSTOCKAND DIE COLLAR
TOGETHER
- RECOVER 100% OF WHIPSTOCKASSEMBLY
Printed 61712018 44:50PM 'All depths reported in Drillers Depths'
Printed 6/7/2018 4.43.50PV `All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 8 of 31
Operation Summary Report
Common Well Name: 11-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 4/24/2018 End Date: 5/16/2018
X3 -018Y4 -O. (6,086,993.00 )
Project: PBU
Site. 11
Rig Name/No.: PARKER 272
Spud Daterrime: 7/11/1986 12:00 OOAM
Rig Release: 5/20/2018
Rig Contractor PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To Him
Task Code NPT Total Depth Phase
Description of Operations
_ _ (hr)
(usft)
01:30 - 02:30 I 1.00
FISH N 6,468.45 WEXIT
INSTALL WEAR BUSHING (9-1/8" ID)
02:30 - 04:00 1.50
STWHIP N 6,468.45 WEXIT
MAKE UP9-5/8"X8-1/2"WHIPSTOCKAND
MILLASSEMBLY TO TOTAL LENGTH OF 111'
MD
- MAKE UP BAKER MWD TO SLB FLEX
COLLAR, FLOAT SUB, AND TRIMILLS
-CHECK DERRICK LEVEL WITH MILL
ASSEMBLY HANGING IN ELEVATORS (83'
TOTAL LENGTH), PIPE HANGS TO THE REAR
OF THE ROTARY TABLE
- SCRIBE MWD TO WHIPSTOCK SLIDE
- DRIFT WELLHEAD WITH MILL ASSEMBLY
'(NO ISSUES)
-MAKE UP WHIPSTOCKAND RUN IN THE
HOLE
_
TRUN
04:00 - 11:00 7.00
_
STWHIP P 6,468.45 WEXIT
IN THE HOLE WITH 9-5/8" X 8-1/2"
WHIPSTOCKAMD MILLASSEMBLY FROM 111'
MD TO TOP OF EZSV AT 6468' MD
I- RUN IN THE HOLE AT 45 FPM
I- SHALLOW HOLE TEST MWD AT 850'MD
WITH 550 GPM, 1100 PSI (GOOD TEST)
. - ORIENT WHIPSTOCK TO 170" LOHS PRIOR
!TO TAGGING EZSV
- TAG EZSV ON DEPTH, PICKUP 2'AND SET
WHIPSTOCK WITH TOP AT 6443' MID, BOTTOM
OF WINDOW PLANNED AT 6457' MD (14'
WINDOW)
SHEAR OFF PER SLB REP WITH 55 KLBS
DOWN (AS EXPECTED FOR PIN)
- PU 187K, SO 144K
11:00 - 12:00 1.00
STWHIP P 8,443.45 WEXIT
DISPLACE WELL TO 9.8 PPG LSND MILLING
FLUID
750 GPM, 2250 PSI
12:00 - 21:30 9.50
STWHIP P 6,457.45 WEXIT
MILL 8-1/2" WINDOW IN THE 9.518" CASING
FROM 6443' MD TO 6457' MD
- 2 FPM ROP PER MILLING PROCEDURE FOR
�
LOW SIDE EXIT
(t
- 400 GPM, 950 PSI, 80-100 RPM, 22/16 KFT-LB
W
TORQUE ON/OFF BOTTOM, 2-5 KLBS WOB
21:30 - 0000 2.50
STWHIP P 6,45745 WEXIT
DRILL NEW FORMATION FROM 6457' MD TO
6469' MD
- 5 FPH ROP
- 400 GPM, 950 PSI, 110 RPM, 16 KFT-LB
TORQUE ON BOTTOM, 5-10 KLBS WOB
- MUD WEIGHT IN/OUT = 9.8 PPG
- NO CEMENT OBSERVED ON THE BACKSIDE
OF THE CASING
5/1/2018 00:00 - 02:00 2.00
STWHIP P 6,477.45 WEXIT
DRILL 20'OF NEW FORMATION FROM 6469'
MD TO 6477' MD
- 5-7 FPH ROP
-400 GPM, 950 PSI, 110 RPM, 16 KFT-LB
TORQUE ON BOTTOM, 5-10 KLBS WOB
- MUD WEIGHT IN/OUT = 9.8 PPG
- REAM WINDOWAND DRIFT WITH NO PUMPS
(NO ISSUES)
TOP OF WINDOW = 6443' MD, BOTTOM = 6457'
MD
Printed 6/7/2018 4.43.50PV `All depths reported in Drillers Depths'
North America - ALASKA - Bla
Operation Summary Report
Common Well Name. 11-23
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 4/24/2018
Project: Pau
Site: 11
Rig Name/No.: PARKER 272
Spud Date/Time: 7/11
Rig Contractor: PARKER DRILLING CO.
2.00
Active datum. 11-23B Actual @74.60usft (above Mean Sea LeveQ
Date From - To Him
Task Code
(hr)
02:00 - 02:30 0.50
STWHIP P
02:30 - 03:30 I 1.00 STWHIP P
03:30
- 06:30
3.00
STWHIP
P
0630
- 08.30
2.00
STWHIP
P
08:30 - 09:30
09:30 - 1200
1.00 STWHIP
2.50 DRILL
End Date: 5/16/2018
Page 9 of 31
AFE No
X3-01 BY4-C. (6,086,993.00 )
Rig Release: 5/202018
BPUOI: USA00001229
NPT Total Depth
Phase Description of Operations
. (usft)
6,477.45
WEXIT PULL MILLS INTO WINDOWAT 6443'MD AND
CIRCULATE HOLE CLEAN
- PUMP 35BBL HIGH VIS SWEEP SURFACE TO
SURFACE
- 750 GPM, 2350 PSI
- VERIFY CONSISTENT MUD WEIGHT IN/OUT
=9.8 PPG
- MONITOR WELL FOR 10 MIN (STATIC)
6,477.45
WEXIT RIG UPAND PERFORM FIT TO 12.6 PPG EMW
-MUD WEIGHT. 9.8 PPG, 4896' TVD, 6443' MD,
PRESSURE
- PUMP 1.1 BBLS TO 730 PSI, BLEED BACK 1
BELS
- PRESSURE BLEEDS DOWN TO 480 PSI IN
TEN MINUTE MONITORING PERIOD
- FIT FOR KICK TOLERANCE> 25 BBLS
APPROVED BY ODE
6,477.45
WEXIT PULL OUT OF THE HOLE FROM 6443' MD TO
THE TOP OF BHAAT 852' MD
- MONITOR WELL ON BOTTOM FOR 10 MIN
(STATIC)
- MUD WEIGHT IN/OUT = 9.8 PPG
- PULL OUT OF THE HOLE AT 250 FPM
6,47745
WEXIT RACK BACK / LAY DOWN MILLING BHA FROM
852' MD TO SURFACE
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING BHA INTO BOP STACK (STATIC)
- RACK BACK HWDP AND LAY DOWN MWD
AND MILLING ASSEMBLY
- LEAD MILL 1/4" UNDER, FOLLOW MILL 3/16'
UNDER, DRESS MILL FULL GAGE
P 6,477.45 WEXIT CLEAN AND CLEAR RIG FLOOR
-FLUSH STACK
P 6,477.45 INTI MAKE UP 8-1/2" INTERMEDIATE MOTOR BHA
TO TOTAL LENGTH OF 184' MD
- PICK UP 8-1/2" HCC VM -1 MILLTOOTH
TRICONE BIT, MOTOR WITH 1.3-AKO, MWD!
LWD
- EMS TOOL 115' BACK FROM THE BIT
12:00 - 15:30 3.50 DRILL P 6,47245 INTI RUN IN THE HOLE WITH THE 8-1/2"
INTERMEDIATE MOTOR BHA ON 5" WIRED
DRILL PIPE FROM 184' MD TO BOTTOM AT
6477' MD
- RUN IN THE HOLE ON ELEVATORS
- 1 ASM 1193' BACK FROM THE BIT, DATA
LINKS EVERY 15 STANDS
Printed 6!72018 4:43:50PM *AB depths reported in Drillers Depths*
Printed 6!7/2018 4:43:50PM `All depths reported in Drillers Depths'
North America
- ALASKA -
BP
Page 10 of 31
Operation Summary Report
Common Well Name. 11-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 4/24/2018
End Date', 5/16/2018
X3 -018Y4 -O. (6,086 993 00 )
Project: PBU
Site: it
Rig Name/No.: PARKER 272
Spud Date/Time: 7/11/1986 12:00:OOAM
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
BPUO1: USA00001229
Active datum: 11-23BActual @74.60usft (above Mean Sea Level)
Date From - To Him
Task Code NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
15:30 - 00:00 8.50
DRILL P
6,781.45
INTI
DIRECTIONALLY DRILL 8-1/2" INTERMEDIATE
HOLE FROM 6477' MD TO 6791' MD, TO GAIN
SEPERATION FROM PARENT WELLBORE AND
ESTABLISH 5 CLEAN MWD SURVEYS
• - 314' IN 10 HOURS = 37 FPH WITH
CONNECTIONS
- 500 GPM, 1570/1500 PSI ON/OFF BOTTOM
- 60 RPM, 16/15 KFT-LBS TRO ON/OFF
BOTTOM, UP TO 15 KLBS WOB
- PU = 218 KLBS, SO = 132 KLBS, ROT = 167
KLBS
- SURVEY EVERY 30'
-ECD ACTUAL =10.88 PPG
- ZERO LOSSES WHILE DRILLING AHEAD
- MUD WEIGHT IN/OUT = 9.8 PPG
- GAS WATCH: AVG BACKGROUND 25 UNITS,
MAX 25 UNITS _
5/2/2018 00:00 - 00:30 0.50
DRILL P
6,808.45
INTI
DIRECTIONALLY DRILL 8-1/2" INTERMEDIATE
HOLE FROM 6791' MD TO 6808' MD, TO GAIN
SEPERATION FROM PARENT WELLBORE AND
ESTABLISH 5 CLEAN MWD SURVEYS
' - ACHIEVED SEPARATION AND 5 CLEAN
SURVEYS BY 6808' MD
- 500 GPM, 1570/1500 PSI ON/OFF BOTTOM
- 60 RPM, 16/15 KFT-LBS TRO ON/OFF
BOTTOM, UP TO 15 KLBS WOB
- PU = 218 KLBS, SO = 132 KLBS, ROT = 167
KLBS
- SURVEY EVERY 30'
-ECD ACTUAL =10.88 PPG
-ZERO LOSSES WHILE DRILLING AHEAD
- MUD WEIGHT IN/OUT = 9.6 PPG
- GAS WATCH: AVG BACKGROUND 25 UNITS,
MAX 25 UNITS
0030 - 01:30 1.00
DRILL P
6,808.45
INTI
BACKREAM FROM 6808' MD TO 6515' MD TO
GET THE UPPER STABILIZER TO THE
BOTTOM OF THE WINDOW
- MONITOR THE WELL FOR 10 MIN (STATIC)
-600 GPM, 1950 PSI, 60 RPM, 17K TORQUE,
1000 FPH
- MUD WEIGHT IN/OUT = 9.8 PPG
01:30 - 03:00 1.50
DRILL P
6,808.45
INTI
MADD PASS FROM 6520' MD TO 6385MD BIT
DEPTH FOR TIE IN LOG ABOVE WINDOW
_
- 500 GPM, 1500 PSI, 250 FPH
03:00 - 05:30 2.50
DRILL P
6,808.45
INTI
PULL OUT OF THE HOLE ON ELEVATORS
FROM 6385' MD TO THE TOP OF THE BHA AT
1204' MD
- MONITOR THE WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM (STATIC)
105:30
- MUD WEIGHT IN/OUT = 9.8 PPG
- 08:30 3.00
DRILL P
6,808.45
INT1
RACK BACK/ LAY DOWN BHA FROM 1204'MD
TO SURFACE
- MONITOR WELL PRIOR TO PULLING BHA
I NTO BOP STACK (STATIC)
- LAY DOWN ALL DIRECTIONAL TOOLS AND 4
STANDS OF 5" HWDP
_
-BIT GRADE: 2 -2 -IN GAGE
08:30 - 09:30 1.00
DRILL P
6,808.45 _
INT1
_ CLEAN AND CLEAR RIG FLOOR
Printed 6!7/2018 4:43:50PM `All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 11 of 31
Operation Summary Report
Common Well Name: 11-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 End Date: 5/1612018
X3-018Y4-C: (6,086,993.00 )
Project: PBU Site: 11
Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 12:00:OOAM
Rig Release: 5/2012018
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To His Task Code NPT Total Depth Phase
Descnpbon of Operations
(hr) (us8)
09:30 - 14:00 4.50 DRILL P 6,808.45 INTI
MAKE UP &1/2" X 9-7/8" ANDERREAMER /
AUTOTRAK BHA TO A TOTAL LENGTH OF 889'
MD
- 8-1/2" SK616 PDC BIT, 9-7/8"
ANDERREAMER, MWD/LWD WITH
PWD/DIR/GR/RES
- EMS 90' BACK FROM BIT
'- SHALLOW HOLE TEST AT 889'MD, 500 GPM,
980 PSI (GOOD TEST)
-OBSERVE INTERMITTENCY IN WIRED PIPE
'SYSTEM AROUND THE AREA OF THE
ANDERREAMER, DECISION MADE TO
_
CONTINUE RUNNING IN THE HOLE
1400 - 1630 2.50 DRILL P 6,808.45 INTI
RUN IN THE HOLE WITH THE 8-1/2" X 9-7/8"
ANDERREAMER / AUTOTRAK BHA ON 5"
WIRED DRILLPIPE FROM 889' MD TO 5646' MD
ASM #1 2027 BACK FROM BIT, ASM #2 4026'
BACK FROM BIT
16:30 - 17:30 1.00 DRILL P 6,808.45 INTI
CUT AND SLIP 56' OF DRILL LINE, 7 WRAPS
- MONITOR THE WELL ON THE TRIP TANKS
(STATIC)
'- RECALIBRATE BLOCK HEIGHT IN AMPHION
AND-BAKER SYSTEMS
1730 - 19.30 2.00 DRILL P 6,808.45 INTI
RUN IN THE HOLE WITH THE 8-1/Z'X 9-7/8"
ANDERREAMER / AUTOTRAK BHA ON 5"
WIRED DRILLPIPE FROM 5648' MD TO
BOTTOM AT 6808' MD
- OBTAIN 3 SURVEYS CLEAN, MATCHING
li
SURVEYS FOR TOOL VERIFICATION AT
SURVEY DEPTHS FROM PREVIOUS BHA, NO
COMMUNICATION WITH MWD THROUGH
WIRED PIPE (MISCOMMUNICATION IS
LOCATED -200' BACK FROM THE BIT), USE
MUOPULSE TELEMETRY FOR SURVEYS AND
DOWNLINKS
- DROP BALL TO OPEN ANDERREAMER AT
6782' MD BIT DEPTH (ANDERREAMER DEPTH
OF 6631' MD)
1930 - 0000 4.50 DRILL P 7,069.45 INT1
DIRECTIONALLY DRILL B-1/2"x9-7/8"
INTERMEDIATE HOLE SECTION FROM 6808'
MD TO 7069', (261 FT IN 4.5 HRS = 58 FT/HR
WITH CONNECTIONS)
- INSTANTANEOUS ROP 100-200 FPH
- 750 GPM, 2690 PSI ON/OFF BOTTOM
- 120 RPM, 18 KFT-LBS TORQUE ON BOTTOM,
17 KFT-LBS TORQUE OFF BOTTOM, 12 KLBS
WOB
- PU = 243 KLBS, SO = 125 KLBS, ROT = 158
KLBS
- SURVEY EVERY STAND
- ECD ACTUAL = 11.18 PPG EM W
-ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 9.8 PPG
- GAS WATCH: AVG BACKGROUND 25 UNITS,
MAX 122 UNITS
Printed 6!7/2018 4:43:50PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Mame. 11-23
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 Eno Date: 5/16/2018
Project: PBU Site: 11
AFE No
X3 -016Y4 -C: (6,006 993 00 )
Page 12 of 31
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @74.60usR (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth
Phase Desaiption of Operations
(hr) (usR)
5/3/2018 00:00 - 06:00 6.00 DRILL P 7,50045
INTI DIRECTIONALLY DRILL S -1/2"x9-7/8"
INTERMEDIATE HOLE SECTION FROM 7069'
MD TO 7500' MD, (431 FT IN 6 HRS = 72 FT/HR
WITH CONNECTIONS)
- INSTANTANEOUS ROP 100-200 FPH
- 750 GPM, 2800 PSI ON/OFF BOTTOM
-150 RPM, 21 KFT-LBS TORQUE ON BOTTOM,
18 KFT-LBS TORQUE OFF BOTTOM, 15 KLBS
WOB
- PU = 243 KLBS, SO = 125 KLBS, ROT = 158
KLBS
- SURVEY EVERY STAND
-ECD ACTUAL= 11.23 PPG EMW
-ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 9.8 PPG
-GAS WATCH: AVG BACKGROUND 25 UNITS,
MAX 257 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 7350' MD,
100% INCREASE IN CUTTINGS BACKAT
SHAKERS
- HOLD UNANNOUNCED D2 KICK WHILE
DRILLING DRILL
0600 - 1200 6.00 DRILL P 7861.45
INTI DIRECTIONALLY DRILL8-1/2"x9-7/8"
INTERMEDIATE HOLE SECTION FROM 7500'
MD TO 7861' MD, (361 FT IN 6 HRS = 60 FT/HR
WITH CONNECTIONS)
- INSTANTANEOUS ROP 150-300 FPH
-700 GPM, 2660 PSI ON/OFF BOTTOM
-150 RPM, 24 KFT-LBS TORQUE ON BOTTOM,
20 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS
WOB
- PU = 250 KLBS, SO = 149KLBS, ROT = 175
KLBS
-SURVEY EVERY STAND
- ECD ACTUAL = 11.1 PPG EMW
-ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 9.8 PPG
- GAS WATCH: AVG BACKGROUND 25 UNITS,
MAX 210 UNITS
Printed 6/7/2018 4:43:50PM `All depths reported in Drillers Depths`
North America - ALASKA - BP Page 13 of 31
Operation Summary Report
Common Well Name: 11-23
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 4/24/2018
End Date: 5/16/2018
Project: PBU
Site: 11
Rig Namai PARKER 272
Spud DateRme: 7/11/1986 12:00
OOAM
Rig Contractor: PARKER DRILLING CO.
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To Him
Task Code NPT
Total Depth Phase
(hr)
(usft)
12:00 - 18:00 6.00
DRILL P
8,495.45 INTI
18.00 - 00'.00 6.00
DRILL P 9,040.45 INT1
Printed 6/7/2018 4.43'.50PM 'All depths reported in Drillers Depths'
AFE No
K3 -018Y4 -C'. (6,086,993,00)
BPUOI: USA00001229
Description of Operations
DIRECTIONALLY DRILL 8-1/2" x 9-7/8"
INTERMEDIATE HOLE SECTION FROM 7861'
MD TO 8495' MD, (634 FT IN 6 HRS = 105 FT/HR
WITH CONNECTIONS)
INSTANTANEOUS ROP 100-300 FPH
-700 GPM, 2700 PSI ON/OFF BOTTOM
-150 RPM, 28 KFT-LBS TORQUE ON BOTTOM,
24 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS
WOB
- PU = 287 KLBS, SO = 155KLBS, ROT = 191
KLBS
SURVEY EVERY STAND
ECD ACTUAL= 11.28 PPG EMW
-ZERO LOSSES WHILE DRILLING AHEAD
NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
-MUD WEIGHT IN/OUT= 10 PPG, BEGIN
BLENDING 290 BBL OF 11.3 PPG SPIKE FLUID
AT 8350' MD TO WEIGHT UP THE SYSTEM TO
10 PPG BY PRIOR TO DRILLING THE CM3
-8798' MD
- GAS WATCH: AVG BACKGROUND 25 UNITS,
MAX 115 UNITS _
DIRECTIONALLY DRILL 8-1/Z'x 9-7/8"
INTERMEDIATE HOLE SECTION FROM 8495'
MD TO 9040' MD, (545 FT IN 6 HRS = 91 FT/HR
WITH CONNECTIONS)
- INSTANTANEOUS ROP 100-300 FPH, LIMIT
ROP AS NECESSARY FOR ECD
MANAGEMENT
.700 GPM, 3000 PSI ON/OFF BOTTOM
- 150 RPM, 28 KFT-LBS TORQUE ON BOTTOM,
24 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS
WOB
- PU = 320 KLBS, SO = 155KLBS, ROT = 195
KLBS
- SURVEY EVERY STAND
-ECDACTUAL=11.4 PPG EMW
- ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEEO ENABLED
- MUD WEIGHT IN/OUT = 10 PPG, COMPLETE
WEIGHT UP TO 10 PPG AT -8500' MD
- GAS WATCH: AVG BACKGROUND 25 UNITS,
MAX 25 UNITS
- HOLD UNANNOUNCED D2 KICK WHILE
DRILLING DRILL
Common Well Name: 11-23
Event Type: RE-ENTER- ONSHORE(RON)
Project: PBU
North America - ALASKA - BP Page 14 of 31
Operation Summary Report
Stan Date: 4/24/2018
Site: 11
End Date: 5116/2018
AFE No
X3 -018Y4 -C:(6,086,993.00)
I Rig Narne/IVo.: PARKER 272 Spud DateTme: 7/11/1986 12:00 OOAM Rig Release: 5/20/2018
Rig Contractor. PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To Hrs Task Code
NPT Total Depth
Phase Description of Operations
_ (hr). _ _ _
(usft)
5/4/2018 00:00 - 06:00 6.00 DRILL P
9,422.45
INT1 DIRECTIONALLY DRILL B -1/2"x9-7/8"
INTERMEDIATE HOLE SECTION FROM 9040'
MD TO 9422' MD, (382 FT IN 6 HRS = 64 FT/HR
WITH CONNECTIONS)
-INSTANTANEOUS ROP 50-100 FPH, LIMIT
ROP AS NECESSARY FOR ECD
MANAGEMENT
- 700 GPM, 3050 PSI ON/OFF BOTTOM
- 120 RPM, 27 KFT-LBS TORQUE ON BOTTOM,
23 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS
WOB
- PU = 300 KLBS, SO = 165KLBS, ROT = 199
KLBS
- SURVEY EVERY STAND
-ECDACTUAL= 11.45 PPG EMW, MAXIMUM
ECD LIMIT 11.5 PPG EMW PER WELL
PROGRAM
- ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
'- MUD WEIGHT IN/OUT = 10 PPG
GAS WATCH: AVG BACKGROUND 25 UNITS,
MAX 66 UNITS
06:00 - 12:00 6.00 DRILL P 9,729.45 INTI DIRECTIONALLY DRILL B -1/2"x9-7/8"
INTERMEDIATE HOLE SECTION FROM 9422'
MD TO 9729' MD, (307 FT IN 6 HRS = 51 FT/HR
WITH CONNECTIONS)
- INSTANTANEOUS ROP 50 - 100 FPH, LIMIT
ROP AS NECESSARY FOR ECD
MANAGEMENT
- 700 GPM, 3250 PSI ON/OFF BOTTOM
- 130 RPM, 27 KFT-LBS TORQUE ON BOTTOM,
25 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS
WOB
- PU = 325 KLBS, SO = 173KLBS, ROT = 207
KLBS
- SURVEY EVERY STAND
-ECO ACTUAL = 11.5 PPG EMW, MAXIMUM
ECD LIMIT 11.5 PPG EMW PER WELL
PROGRAM
-ZERO LOSSES WHILE DRILLING AHEAD
NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 10.1 PPG
- GAS WATCH: AVG BACKGROUND 25 UNITS,
MAX 69 UNITS
- PUMP 35 BBL HIGH VIS SWEEP AT 9445' MD,
50% INCREASE IN CUTTINGS BACKAT
SHAKERS
Printed 6/7/2018 4:43:50PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 15 of 31
Common Well Name. 11-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 Eno Date. 5/16/2018
X3 -018Y4 -C: (6,086,993.00 )
Project: PBU Site: 11
Rig Name/No.: PARKER 272 Spud Date/Fime: 7/11/1986 12:00:00AM
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-238 Actual @74.60usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase
Description of Operations
_ (hr) _ _ _(usft)
_
12:00 - 18:00 6.00 DRILL P 10,069.45 INTI
DIRECTIONALLY DRILL 8-1/2"x9-7/8"
INTERMEDIATE HOLE SECTION FROM 9729'
MD TO 10069' MD, (340 FT IN 6 HRS = 56 FT/HR
WITH CONNECTIONS)
',- INSTANTANEOUS ROP 50 - 100 FPH, LIMIT
ROP AS NECESSARY FOR ECD
I
MANAGEMENT
- 700 GPM, 3330 PSI ON/OFF BOTTOM
- 130 RPM, 25 KFT-LBS TORQUE ON BOTTOM,
23 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS
WOB
- PU = 305 KLBS, SO = 190KLBS, ROT = 219
KLBS
- SURVEY EVERY STAND
-ECD ACTUAL= 11.5 PPG EMW, MAXIMUM
ECD LIMIT 11.5 PPG EMW PER WELL
PROGRAM
- ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
MUD WEIGHT IN/OUT= 10.3 PPG, PERFORM
WEIGHT UP/DILUTION WITH BLACK
PRODUCT EARLY IN AN ATTEMPT TO HELP
. ECD WITH NO SUCCESS, ECD SUSTAINED
11.5 PPG EMW AFTER WEIGHT UP/DILUTION
- GAS WATCH: AVG BACKGROUND 40 UNITS,
MAX 202 UNITS
- PUMP 35 BBL HIGH VIS SWEEPAT 9921' MD,
75% INCREASE IN CUTTINGS BACKAT
SHAKERS
1800 - 0000 6.00 DRILL P 10,337.45 INTI
DIRECTIONALLY DRILL8-1/2"x9-7/8"
INTERMEDIATE HOLE SECTION FROM 10069'
MD TO 10337' MD, (268 FT IN 6 HRS = 45 FT/HR
WITH CONNECTIONS)
-INSTANTANEOUS ROP 50 - 80 FPH, LIMIT
ROP AS NECESSARY FOR ECD
MANAGEMENT
-700 GPM, 3300 PSI ON/OFF BOTTOM
-130 RPM, 29 KFT-LBS TORQUE ON BOTTOM,
27 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS
WOB
- PU = 323 KLBS, SO = 182KLBS, ROT = 221
KLBS
- SURVEY EVERY STAND
-ECD ACTUAL= 11.5 PPG EMW, MAXIMUM
ECD LIMIT 11.5 PPG EMW PER WELL
PROGRAM
-ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 10.3 PPG
- GAS WATCH: AVG BACKGROUND 40 UNITS,
MAX 193 UNITS
- PUMP 35 BBL HIGH VIS SWEEPAT 10209'
MD, 25% INCREASE IN CUTTINGS BACKAT
SHAKERS
-PERFORM WEEKLY BOPE FUNCTION TEST
Printed 6/7/2018 4:43:50PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name: 11-23
Event Type: RE -ENTER -ONSHORE (RON) Start Date 4/24/2018 End Date. 5116/2018
Project: PBU Site: 11
Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 1Z00:00AM
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth
(hr) (usft)
5/5/2018 00:60---06:00 6.00 DRILL P 10,615.45
Page 16 of 31
AFE No
K3 -018Y4 -C: (6.086 993 00 )
BPUOI: USA00001229
Phase Description of Operations
--._. __
INTI DIRECTIONALLY DRILL-8
INTERMEDIATE HOLE SECTION FROM 10337'
MD TO 10615' MD, (280 FT IN 6 HRS = 44 FT/HR
WITHWITH C�T�NIS)
- INSTANTANEOUS ROP 50-80 FPH, LIMIT
ROP AS NECESSARY FOR ECD
MANAGEMENT
700 GPM, 3300 PSI ON/OFF BOTTOM
- 130 RPM, 30 KFT-LBS TORQUE ON BOTTOM,
28 KFT-LBS TORQUE OFF BOTTOM, 22 KLBS
WOB
- PU = 323 KLBS, SO = 192KLBS, ROT = 226
KLBS
- SURVEY EVERY STAND
ECDACTUAL= 11.5 PPG EMW, MAXIMUM
ECD LIMIT 11.5 PPG EMW PER WELL
PROGRAM
-ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 10.3 PPG
- GAS WATCH: AVG BACKGROUND 140 UNITS,
_ MAX 610 UNITS
06:00 - 08:00 2.00 DRILL P 10,815.451 INTI CIRCULATE UP SAMPLES WITH I.5X
BOTTOMS UP
08:00 - 10:00 2.00 DRILL P
10:00 - 15:30 5.50
1530 - 18:30 3.00
DRILL P
DRILL P
1830 - 19:00 0.50 DRILL P
1900 - 2030 1.50 CASING P
Printed 6/7/2018 4:43:SOPM 'All depths reported in Drillers Depths`
- 700 GPM, 3275 PSI, 60 RPM, 25-27 KFT-LBS
TORQUE, RECIPROCATE PIPE 40'
- OBSERVED SHUBLIK IN SAMPLES,
ESTIMATE ONLY -1' INTO SHUBLIK, DECISION
MADE TO DRILLAN ADDITIONAL 2'MD
10,617.45
INTI DRILL AN ADDITIONAL 2'MD TO HOLE
SECTION TDAT 10617' MD, 8315' TVD AND
CIRCULATE HOLE CLEAN WITH 1.5 BOTTOMS
UP
- 700 GPM, 3250 PSI, 60 RPM, 18-20 KFT-LBS
TORQUE, RECIPROCATE 70'
- MONITOR WELL FOR 10 MIN (STATIC)
10,617.45
INTI PULL OUT OF THE HOLE FROM BOTTOM AT
10617' MD TO THE TOP OF THE BHAAT 889'
MD
- MUD WEIGHT IN/OUT = 10.3 PPG
-OBTAIN SURGE/SWAB DATA WITH WIRED
PIPE ASM'S IN THE COVILLE AT -9500' MD
- PU 325 KLBS, SO 185 KLBS ON BOTTOM
-MONITOR WELL PRIOR TO PULLING NON
SHEARABLES INTO BOP STACK (STATIC)
10,617.45
INT1 LAY DOWN BHA FROM 889' MD TO SURFACE
- BIT GRADE: 1 -1 -IN GAGE
-ANDERREAMER IN GOOD CONDITION NO
CHIPPED OR BROKEN CUTTERS
- NO ELECTRICAL CONNECTIVITY THROUGH
ANDERREAMER
10,617 45
INTI CLEAN AND CLEAR RIG FLOOR
10,617.45
INTI RIG UP DOYON CASING CREW TO RUN 7"
LINER
- DOUBLE STACK TONGS, SIDE DOOR
ELEVATORS, PS -21 SLIPS WITH 7" SLIP
BODIES
Printed 6/7/2018 4:43:SOPM 'All depths reported in Drillers Depths`
Common Well Name'. 11-23
Event Type: RE-ENTER- ONSHORE (RON)
PBU
North America - ALASKA - BP Page 17 of 31
Operation Summary Report
Start Date. 4/24/2018 End Date: 5/16/2018
Site 11
Spud Date/time: 7/11/1986 12:00:OOAM
Rig Contractor. PARKER DRILLING CO.
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To Hrs Task Code
_ _ _____ (hr)
20:30 - 0000 3.50 CASING P
5/6/2018 00:00 - 04:00 4.00 CASING P
04:00 - 0690
2.00 CASING P
AFE No
(6,086,993.00 )
Rig Release: 5/20/2018
BPUOI'. USA00001229
NPT Total Depth
Phase Description of Operations
(usft)
10,617.45
INTI RUN 7", 26#, L-80, VAMTOP HC LINER TO 2025'
P
MD AT MIDNIGHT
09:30 - 12:30 3.00
- CHECK FLOATS (HOLDING)
P
- USE JET LUBE SEAL GUARD PIPE DOPE
- TORQUE CONNECTIONS TO 11950 FT -LBS
- RUN 1 CENTRALIZER FREE FLOATING ON
JOINTS 1 - 34
- FILL ON THE FLY AND TOP OFF EVERY IO
JOINTS
10,617.45
INTI RUN 7',26#, L-80, VAMTOP HC LINER FROM
10,617.45
2025' MO TO LINER TOTAL LENGTH AT 4329'
'MD
- USE JET LUBE SEAL GUARD PIPE DOPE
- TORQUE CONNECTIONS TO 11950 FT -LBS
- FILL ON THE FLY AND TOP OFF EVERY 10
JOINTS
MAKE UP LINER HANGER/PACKER ASSEMBLY
ADD PAL MIX
- CIRCULATE 1X LINER VOLUMES AT 10 BPM,
660 PSI
- PU 120 KLBS, SO 102 KLBS WITH LINER
_ FULL
INT1 RUN IN HOLE WITH THE 7" LINER ON 5"
DRILLPIPE TO THE 9-5/8" WINDOW AT 6443'
MD
- RIH AT 90 FT/MIN, ALL UPWARD MOVEMENT
WITH PUMPS ON AT 2 BPM AND LESS THAN
50 FT/MIN
- FILL ON THE FLY AND TOP OFF EVERY 10
STANDS
- HOLD UNANNOUNCED D1 KICK WHILE
TRIPPING DRILL
INTI CIRCULATE 1.5X BOTTOMS UP
- 8 BBUMIN, 620 PSI
_ - PU 158 KLBS, SO 118 KLBS
INTI RUN IN HOLE WITH THE 7" LINER ON 5"
DRILLPIPE FROM THE 9-5/8" WINDOW AT
6443' MD TO LINER SET DEPTH AT 10615' MD
(LINER TOP AT 6285' MD)
- CIRCULATE DOWN 4 CORSECUTIVE
STANDS ABOVE THE HRZ TO GETA
BOTTOMS UP BY THE TOP OF THE HRZAT
10379' MD (5 BPM, 600 PSI, 1400 STROKES
EACH)
- WASH DOWN LAST 15AT 2 BPM, 380 PSI
- TAG BOTTOM AT 10617' MD AND PICK UP 2'
TO LINER SET DEPTH AT 10615' MD
-NO ISSUES RUNNING THROUGH OPEN
HOLE
- FINAL PU 310 KLBS, SO 164 KLBS WITH
PUMPS ON AT 2 BPM, PARKER 272 BLOCK
WEIGHT 35 KLBS
Printed 6712018 4:43:50PM 'All depths reported in Drillers Depths'
06:00 - 09:30 3.50
CASING
P
10,617.45
09:30 - 12:30 3.00
CASING
P
10,617.45
2025' MO TO LINER TOTAL LENGTH AT 4329'
'MD
- USE JET LUBE SEAL GUARD PIPE DOPE
- TORQUE CONNECTIONS TO 11950 FT -LBS
- FILL ON THE FLY AND TOP OFF EVERY 10
JOINTS
MAKE UP LINER HANGER/PACKER ASSEMBLY
ADD PAL MIX
- CIRCULATE 1X LINER VOLUMES AT 10 BPM,
660 PSI
- PU 120 KLBS, SO 102 KLBS WITH LINER
_ FULL
INT1 RUN IN HOLE WITH THE 7" LINER ON 5"
DRILLPIPE TO THE 9-5/8" WINDOW AT 6443'
MD
- RIH AT 90 FT/MIN, ALL UPWARD MOVEMENT
WITH PUMPS ON AT 2 BPM AND LESS THAN
50 FT/MIN
- FILL ON THE FLY AND TOP OFF EVERY 10
STANDS
- HOLD UNANNOUNCED D1 KICK WHILE
TRIPPING DRILL
INTI CIRCULATE 1.5X BOTTOMS UP
- 8 BBUMIN, 620 PSI
_ - PU 158 KLBS, SO 118 KLBS
INTI RUN IN HOLE WITH THE 7" LINER ON 5"
DRILLPIPE FROM THE 9-5/8" WINDOW AT
6443' MD TO LINER SET DEPTH AT 10615' MD
(LINER TOP AT 6285' MD)
- CIRCULATE DOWN 4 CORSECUTIVE
STANDS ABOVE THE HRZ TO GETA
BOTTOMS UP BY THE TOP OF THE HRZAT
10379' MD (5 BPM, 600 PSI, 1400 STROKES
EACH)
- WASH DOWN LAST 15AT 2 BPM, 380 PSI
- TAG BOTTOM AT 10617' MD AND PICK UP 2'
TO LINER SET DEPTH AT 10615' MD
-NO ISSUES RUNNING THROUGH OPEN
HOLE
- FINAL PU 310 KLBS, SO 164 KLBS WITH
PUMPS ON AT 2 BPM, PARKER 272 BLOCK
WEIGHT 35 KLBS
Printed 6712018 4:43:50PM 'All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 18 of 31
Common Well Name: 11-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 4/24/2018
End Date: 5/16/2018
X3 -018V4 -C: (6.086.99100)
Project PBU
Site: 11
Rig Name/No.: PARKER 272
Spud Daterrime: 7/11/1986 12:00:00AM
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23BActual @74.60usft (above Mean Sea Level)
Date From - To Him
Task Code NPT
Total Depth Phase
Description of Operations
_ (hr)
_ (-it)
12:30 - 15:30 3.00
CASING P
10,61745 INTI
CIRCULATE AND CONDITION MUD 1.75
BOTTOMS UP
- STAGE PUMPS UP TO CEMENTING RATE AT
7 BPM:
- 2 BPM, 350 PSI
- 3 BPM, 400 PSI
-4 BPM, 470 PSI
- 5 BPM, 600 PSI
-6 BPM, 710 PSI
- 7 BPM, ICP 820 PSI - FCP 755 PSI
RECIPROCATE PIPE 30' ON SURFACE
Printed 817/2018 4:43:50PM 'All depths reported in Drillers Depths'
Common Well Name: 11-23
Event Type: RE-ENTER- OI
Project: PBU
North America -ALASKA - BP
Operation Summary Report
Page 19 of 31
AFE Na
(RON) Start Date: 4/24/2018 End Date. 5/16/2018 X3 -018Y4 -C. (5,086 993 00 )
Site: 11-
Rig Contractor: PARKER DRILLING CO.
Active datum: 11-23B Actual @74.BOusft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth
(hr) (usft)
15:30 - 18:00 2.50 CASING P 10,617.45
BPUOI: USA00001229
Phase Descripbon of Operations
INTI CEMENT 7", 26 #/FT, L-80 VAMTOP HC LINER
PER APPROVED SLB CEMENTICS MODEL
-PERFORM PRESSURE CROSSCHECK
CHECKLISTAND PRESSURE TEST SURFACE
LINES TO 250 PSI LOW AND 4500 PSI HIGH
FOR 5 MIN
- PUMP 40 BBLS OF 12 PPG MUDPUSH II
SPACER @ 5 BPM, 460 - 250 PSI
- LAUNCH BOTTOM DRILL PIPE WIPER DART
- PUMP 96.8 BBLS OF 75.8 PPG CLASS G TAIL
(YIELD 1.16 DU.FT/S K) @ 5 BPM, 600 PSI
P
N H TOP DRILL PIPE WI ER UART AND
KICK OUT WITH 10 BBLS OF FRESH WATER
DID NOT OBSERVE FIRST DART LATCH
RECIPROCATE 30' AT SURFACE WHILE
PUMPING CEMENT
PERFORM DISPLACEMENT WITH RIG PUMPS
AND 10,3 PPG _SND AT 7 BPM
- @ 85 BBLS AWAY, REDUCE RATE TO 3 BPM
FOR 10 BBLS TO LATCH UP SECOND DART,
DID NOT OBSERVE SECOND DART LATCH
- @ 245 BBLS AWAY, REDUCE RATE TO 3 BPM
TO BUMP THE PLUG, ICP 875 PSI, FCP 975 PSI
- DID NOT OBSERVE LATCH FOR FIRST OR
SECOND DART, CONTINUE TO PUMP
DISPLACEMENT BASED ON CALCULATED
STROKES
-OBSERVE BOTTOM PLUG LAND AND BURST
@ 160 BBLSAWAY: DID NOT CORRECT FINAL
STROKES FOR BUMP
- REDUCE RATE TO 3 BPM PRIOR TO PLUG
BUMP: FINAL CIRCULATING PRESSURE 975
PSI
- DISPLACEMENT FLUID: 252.5 BBLS OF 10.5
PPG _SND (MEASURED BY STROKES @ 96%
PUMP EFFICIENCY)
- TOTAL DISPLACEMENT VOLUME 262 BBLS
INCLUDING THE 10 BBLS OF WATER FROM
SLB
- RECIPROCATE 30' AT SURFACE DURING
DISPLACEMENT, OBSERVE SLACK OFF
WEIGHTS TRENDING LOWER, PARK LINER
ON SET DEPTH AT 10615' MD, 227 BBL INTO
DISPLACEMENT
- TOTAL LOSSES FROM CEMENT EXIT SHOE
TO CEMENT IN PLACE: 0 BBL
- INCREASE PRESSURE TO 1475 PSI, 500 PSI
OVER PLUG BUMP
- FIELD PICK TOC 8480' MD, GAUGE HOLE
BLEED OFF PRESSURE AND CHECK FLOATS -
HOLDING
CEMENT IN PLACE AT 17:39 HRS
SEEATTACHED CEMENT DOCUMENTATION
Printed 6/7/2018 4A3:50PM 'All depths reported in Drillers Depths'
Common Well Name: 11-23
Event Type: RE-ENTER- ONSHORE (RON)
Project PBU
North America - ALASKA - BP
Operation Summary Report
Start Date: 4/24/2018
Site: 11
End Date. 5/16/2018
AFE No
K3 -018Y4 -C:(6,086.993,00)
Page 20 of 31
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To Him
Task Code NPT Total Depth
Phase Description of Operations
(hr)
(usft)
18:00 - 18:30 0.50
CASING P 10,617.45
INTI SET LINER HANGER, RELEASE FROM LINER,
AND SET LINER TOP PACKER
- PRESSURE UP 702800 PSI
- SLACK OFF TO 70K STING WEIGHT (LAST
OBSERVED SLACK OFF WEIGHT= 155 KLBS)
- PRESSURE UP TO 3600 PSI
- BLEED PRESSURE OFF
- PICK UP 10' TO EXPOSE DOGS, PICK UP
WEIGHT 160 KLBS (LAST OBSERVED PU
325K), GOOD INDICATION RUNNING TOOL
RELEASED FROM LINER
- WITH DOGS EXPOSED INITIATE ROTATION
AND SET DOWN ON LINER TOP TO 53 KLBS,
OBSERVE GOOD INDICATION LINER TOP
PACKER SET
- PRESSURE UP TO 500 PSI AND PULL OUT
OF LINER WITH LINER RUNNING TOOL,
INCREASE RATE TO 13 BPM, 1400 PSI ONCE
LINER RUNNING TOOL IS OUT OF LINER
HANGER
18:30 - 19:00 0.50
CASING P 10 61745
INTI CIRCULATE NUTPLUG SWEEP SURFACE TO
SURFACE TO CLEAN ANY RESIDUAL CEMENT
OUT OF PIPE
- 13 BPM, 1400 PSI
'- LAY DOWN CEMENT HEAD
1900 - 2330 4.50
CASING P 10.61745
INTI PULL OUT OF THE HOLE ON ELEVATORS
FROM THE LINER TOPAT 8285' MD TO
SURFACE
- MONITOR THE WELL FOR 10 MIN (STATIC)
- LAY DOWN LINER RUNNING TOOL, DOGS
WERE OUT, NO DAMAGE OR MISSING PARTS
SIMOPS:
- PRESSURE TEST CHOKE MANIFOLD
_OFFLINE
23:30 - 00:00 0.50 CASING P 10,617.45 INT1 CLEAN AND CLEAR RIG FLOOR
5/7/2018 0000 - 0200 2.00 WHSUR P 10,617.45 INTI RIG UP TO TEST THE TUBING HANGER SEAL
AREA IN THE TUBING HEAD
-PULL WEAR BUSHING
-SET TEST PLUG
- FILL THE STACK WITH WATER
- CLOSE BLIND RAMSAND PRESSURE UP TO
1000 PSI
- CAMERON REP ON LOCATION TO RUN IN
LOCK DOWN SCREWS
- PRESSURE TEST THE TUBING HANGER
SEALAREA IN THE TUBING HEAD WITH THE
TEST PLUG TO 250 PSI LOWAND 3500 PSI
HIGH FOR 5 MIN EACH (PASS)
SIMOPS:
- PRESSURE TEST CHOKE MANIFOLD
OFFLINE
Printed 6!72018 4:43:50PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 21 of 31
Common Well Name: 11-23
- 02:00
1.00
BOPSUR
N
0200
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date'. 4/24/2018
End Date. 5/16/2018
X3 -018Y4 -C: (6,086,993.00 )
Project: PBU
1.00
Site: 11
P
INTI INSTALLAIR BOOTSAND FLOW RISER
- FILL STACK WITH WATER AND BLEED AIR
Rig Name/No.: PARKER 272
FROM LINES
Spud Date/Time: 7/11/1986 12:00:00AM
INTI PRESSURE TEST THEANNULAR TO 250 PSI
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
- TEST WITH 2-7/8" AND 4-1/2" TEST JOINTS
(PASSING TESTS)
10,617.45
BPUOI: USA00001229
Active datum: 11-23B Actual @74.60us8
(above
Mean Sea Level)
TO TEST THE 7" LINER
10,61745
INTI PRESSURE TEST THE 7- INTERMEDIATE,
Date From - To
Hire
Task
Code NPT
Total Depth
Phase
Description of Operators
(hr)
10,617.45
INTI PICK UP6-1/8" PRODUCTION HOLE DRILLING
(usfl) _
BHA TO A TOTAL LENGTH OF 151' MD
0200 - 0430
2.50
13OPSUR
P
10,617.45
IE
NTI
CHANG OUT UPPER RAMS IN BOP STACK
- PU 40 KLBS, SO 40 KLBS
FROM 4-1/2" X 7" VBR TO 2-7/8" X 5" VBR
- BARRIERS FOR BREAKING CONTAINMENT
TO CHANGING OUT UPPER RAMS:
- CLOSED BLIND / SHEAR RAMS
- KILL WEIGHT FLUID, MONITORED
THROUGH THE SECONDARY KILL LINE WITH
CONTINUOUS HOLE FILL WITH A CHARGE
PUMPANDAN OPEN BLEEDER TO AN
ISOLATED ACTIVE PIT 1 (STATIC)
SIMOPS:
CHANGE OUT SAVER SUB AND PIPE
HANDLER ON THE TOP DRIVE
- REMOVE ALL WIRED PIPE COMPONENTS
- LEAVE STRING SENSE ON TOP DRIVE
0430 - 1000
5.50
BOPSUR
P
10,617.45 1
INTI
COMPLETE CHANGING OUT SAVER SUB AND
'_PIPE HANDLER ON TOP DRIVE
10:00 - 16:30
6.50
BOPSUR
P
10,617.45
INTI
TEST BORE TO 250 PSI LOW, 3500 PSI HIGH
FOR 5 MINUTES EACH
-TEST WITH 2-7/8"AND 4-1/2"TEST JOINTS
-ALL TESTS CHARTED, SEE ATTACHED BOP
TESTCHARTS
- 1 FAILURE, ANNULAR PREVENTER
-TEST WITNESS WAIVED BY AOGCC REP
LOU LAUBENSTEIN _
1630 - 0000
7.50
r BOPSUR
N
10,617.45
INTI
CHANGE OUTANNULAR PREVENTER
ELEMENT
- MONITOR WELLTHROUGH THE
5/8/2018 00:00 - 01:00 1.00
N
01:00
- 02:00
1.00
BOPSUR
N
0200
- 03:300
1.50
WHSUR
P
03:30
- 04:30
1.00
CASING
P
0430 - 0700 2.50 DRILL P
Printed 61'7/2018 4.43:50PM *All depths reported in Drillers Depths*
SECONDARY KILL LINE WITH CONTINUOUS
HOLE FILL WITH A CHARGE PUMPAND AN
OPEN BLEEDER TO AN ISOLATED ACTIVE PIT
1 (STATIC)
SIMOPS:
- LAY DOWN STANDS OF 5" DRILLPIPE WITH
OFFLINE EQUIPMENT
10,617.45
INTI INSTALLAIR BOOTSAND FLOW RISER
- FILL STACK WITH WATER AND BLEED AIR
FROM LINES
10,61745
INTI PRESSURE TEST THEANNULAR TO 250 PSI
LOW AND 3500 PSI HIGH FOR 5 MIN EACH
- TEST WITH 2-7/8" AND 4-1/2" TEST JOINTS
(PASSING TESTS)
10,617.45
INT1 RIG DOWN TESTING EQUIPMENT, PULL TEST
PLUG, SET WEAR BUSHING AND PREPARE
TO TEST THE 7" LINER
10,61745
INTI PRESSURE TEST THE 7- INTERMEDIATE,
LINER AND LINER TOP PACKER TO 3500 PSI _
HIGH FOR 30 MIN
- CEMENT @ 500 PSI COMPRESSIVE
STRENGTH BY 01:48 ON 05107/2018
-TEST APPROVED BY WSUP
10,617.45
INTI PICK UP6-1/8" PRODUCTION HOLE DRILLING
BHA TO A TOTAL LENGTH OF 151' MD
- 6-1/8" SKC613M PDC BIT, AUTOTRAK,
MWD/LWD
(GAM/RES/PRESIVSS/SU RVEY/DEN/N EU/CALI
PER)
- PU 40 KLBS, SO 40 KLBS
Printed 61'7/2018 4.43:50PM *All depths reported in Drillers Depths*
Printed 6/7/2018 4:43:50PM *All depths reported in Drillers Depths"
North America
- ALASKA -
BP
Page 22 of 31
Operation Summary Report
Common Well Name. 11-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Dale. 4/24/2018
End Date: 5/16/2018
X3-01 BY4-C: (6,086,993.00 )
Project: PBU
Site: 11
Rig Name/No.: PARKER 272
Spud Daterrime: 7/11/1986 12:00:00AM
Rig Release: 5120/2018
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @74 60usft
(above Mean Sea Level)
Date From - To
Him
Task
Code NPT
Total Depth
Phase
Description of Operations
(hr)
(usft)
07:00 - 08:00
1.00
DRILL
P
10,617.45
INTI
RUN IN HOLE WITH 6-1l8" RSS ASSEMBLY
FROM 151'MD TO 1560'MD
08:00 - 08:30
0.50
DRILL
P
10,617.45
INTI
SHALLOW HOLE TEST MWD TOOLS AT 767'
MD: GOOD TEST
- 300 GPM, 1560 PSI
_
- PU 60 KLBS, SO 60 KLBS
08:30 - 13:30
5.00
DRILL
P
10,617.45
INTI
CONTINUE RUNNING IN THE HOLE WITH BHA
#5 ON 4" DRILL PIPE STANDS FROM 1560' MD
TO 10407' MD
- FILL PIPE EVERY 20 STANDS
- MONITOR DISPLACEMENT WITH TRIP TANK
GOOD DISPLACEMENT
-MUDWEIGHT IN/OUT=10.3PPG
1330 - 21:00
7.50
DRILL
P
10,617.45
INTI
WASH DOWN FROM 10407' MD AND DRILL
PLUGS, LANDING COLLAR AND CEMENT TO
10605' MD (10' FROM 7" LINER SHOE)
•
•-WASH DOWN AND TAG LINER WIPER PLUGS
AT 10527' MD
DRILL LINER WIPER PLUGS AND LANDING
COLLAR FROM 12872' MO TO 12878' MD
- VARY PARAMETERS TO GET PLUGSAND
LANDING COLLAR TO DRILL UP
-250 GPM, 1975 PSI
.70 RPM, 12-17 KFT-LBS TORQUE
-6-19 KLBS WOB
-MUD WEIGHT IN/OUT= 10.3 PPG
- OBSERVED RUBBER PLUGS AND ALUMINUM
OVER SHAKERS
2100 - 23:00
2.00
DRILL
P
10,617.45
INT1
DISPLACE WELL FROM 10.3 PPG LSND TO 8.5
PPG QUIK DRILL
-300 GPM @2670 PSI ICP, 1445 FCP
-WORK PIPE AT 1000 FPH
-70 RPM@ 12K TORQUE
-FLOW CHECK WELL FOR 15 MINUTES,
STATIC
-WSUPAPPROVAL TO PROCEED.
23:00 - 2330
0.50
DRILL
P
10617.45
INTI
SERVICE TOP DRIVE
-23:30 - 00:00
0.50
DRILL
P
10,617.45
INTI
DRILL OUT REMAINING SHOE TRACK FROM
10605' TO 10615'
-300 GPM@ 1390 PSI
-60 RPM @9K TORQUE
-10K WOB
-PU WT 194K,SO WT 137K
-FLOW CHECK WELL FOR 15
MINUTES,STATIC.
5/9/2018 00:00 - 0030
0.50
DRILL
P
10,637 45
INTI
DRILL 20' NEW HOLE FROM 10817' TO 10637'
-300 GPM@ 1520 PSI
-100 RPM @13K TORQUE
-10K WOB
-PU WT 200K,SO WT 133
00:30 - 01:00
0.50
DRILL
P
10,63745
INTI
CIRCULATE IX BOTTOMS UP TO CLEAN UP
THE HOLE
- 300 GPM, 1520 PSI _
01:00 - 02:30
1.50
DRILL
P
10,637.45
INTI
PERFORM FIT TO 10.0 PPG
-MUD WT 8.5 PPG, iV6 8314, PRESSURE 650
PSI
-PUMP 1.5 BBLS, 1.5 BELS BACK
-TEST APPROVED BY ODE
Printed 6/7/2018 4:43:50PM *All depths reported in Drillers Depths"
Common Well Name. 11-23
Event Type: RE-ENTER- ONSHORE (RON)
Project: PBU
Rig Name/No.: PARKER 272
Rig Contractor: PARKER DRILLING CO.
Active datum: 11-23B Actual @74.60usfl (ahoy
Date From - To Him
_— (hr)
02:30 - 12:00 9.50
North America - ALASKA- BP
Operation Summary Report
Start Date: 4/24/2018
Site: 11
Mean Sea Level)
Task Code
DRILL P
1200'. - 0000 1200.DRILL P
Page 23 of 31 1
End Date: 5/16/2018 X3 -018Y4 -C: (6,086,993.00 )
BPUOI: USA00001229
NPT Total Depth
Phase Description of Operations
(usft)
11,09745
PROD1 DIRECTIONALLY DRILL 6-1/8'; PRODUCTION
HOLE SECTION FROM 10637' MD TO 11097'
MD (8652' TVD),
- 460 FT IN 9.5 HRS = 48.4 FT/HR WITH
CONNECTIONS
-INSTANTANEOUS ROP 34-200 FPH
- 300 GPM, 1630 PSI ON/OFF BOTTOM
- 150 RPM, 16 KFT-LBS TORQUE ON BOTTOM,
14 KFT-LBS TORQUE OFF BOTTOM, 7-15 KLBS
WOB
- PU = 225 KLBS, SO = 126 KLBS, ROT = 161
KLBS
- SURVEY EVERY 30 FT
-ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 8.6 PPG
- GAS WATCH: AVG BACKGROUND 24 UNITS,
_
MAX 789 UNITS_
11,568.45
PROD1 DIRECTIONALLY DRILL 6-1/8" PRODUCTION
HOLE SECTION FROM 11097 MD TO 11568' MD
(8772' TVD),
-471 FT IN 12.0 HIPS =39.3 FT/HR WITH
CONNECTIONS
'-INSTANTANEOUS ROP 34-100 FPH
- 300 GPM, 1740 PSI ON/OFF BOTTOM
- 150 RPM, 18 KFT-LBS TORQUE ON BOTTOM,
15 KFT-LBS TORQUE OFF BOTTOM, 15-20
KLBS WOB
- PU = 230 KLBS, SO = 128 KLBS, ROT = 162
KLBS
- SURVEY EVERY 30 FT
-ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 8.6 PPG
- GAS WATCH: AVG BACKGROUND 70 UNITS,
MAX 339 UNITS
Printed 8/7/2018 4AT50PM "All depths reported in Drillers Depths`
SWEEPS:
-35 BBL HIGH -VIS SWEEP AT 11757' MD, 25%
INCREASE IN CUTTINGS OBSERVED
-35 BBL HIGH -VIS SWEEP AT 12350' MD, NO
-SIGNIFICANT INCREASE OBSERVED
12:00 - 00:00 12.00 DRILL P 13,018.45 PROD1 DIRECTIONALLY DRILL 6-1J8" PRODUCTION
HOLE SECTION FROM 12387' MD TO 13018'
MD (8750' TVD)
- 631 FT IN 12.0 HRS = 52-6 FT/HR WITH
CONNECTIONS
- INSTANTANEOUS ROP 50 - 110 FPH
- 325 GPM, 2110 PSI ON/OFF BOTTOM
-150 RPM, 18 KFT-LBS TORQUE ON BOTTOM,
j 16 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS
WOB
- PU = 225 KLBS, SO = 125 KLBS, ROT = 158
KLBS
- SURVEY EVERY 90 FT
-ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 8.7 PPG
- GAS WATCH: AVG BACKGROUND 140 UNITS,
MAX 381 UNITS
SWEEPS:
- 35 BBL LOW -VIS 135 BBL HIGH VIS TANDEM
SWEEPAT 12895' MD, 75% INCREASE IN
CUTTINGS OBSERVED
Pnnted 6/7/2018 4:43:50PM *All depths reported in Drillers Depths`
North America - ALASKA - BP
Page 24 of 31
Operation Summary Report
Common Well Name: 11-23
AFE No
Event Type. RE-ENTER- ONSHORE (RON)
Start Date: 4/24/2018 End Date: 5/16/2018
X3 -016Y4 -C: (6,086,993.00 )
Project: PBU - -
Site: 11
Rig Name/No.: PARKER 272
Spud Date/rime: 7/11/1986 12:00 OOAM
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @74.60us8 (above Mean Sea Level)
Date From - To Him
Task Cade NPT Total Depth Phase
Description of Operations
(hr)
_ _ (usft)
5/10/2018 00:00 - 12:00 12.00
DRILL P 12,387.45
PROD1
OIRECTIONALLY DRILL 6-1/8" PRODUCTION
HOLE SECTION FROM 11568' MD TO 12387'
MD (8763' TVD)
- 819 FT IN 12.0 HRS = 68.3 FT/HR WITH
CONNECTIONS
-INSTANTANEOUS ROP 50-125 FPH
- 300-325 GPM, 1750-2093 PSI ON/OFF
BOTTOM
- 150 RPM, 18 KFT-LBS TORQUE ON BOTTOM,
16 KFT-LBS TORQUE OFF BOTTOM, 10-20
KLBS WOB
- PU = 230 KLBS, SO = 128 KLBS, ROT = 159
KLBS
- SURVEY EVERY 90 FT
'- ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
-MUD WEIGHT IN/OUT=8.6+PPG
- GAS WATCH: AVG BACKGROUND 120 UNITS,
MAX 354 UNITS
SWEEPS:
-35 BBL HIGH -VIS SWEEP AT 11757' MD, 25%
INCREASE IN CUTTINGS OBSERVED
-35 BBL HIGH -VIS SWEEP AT 12350' MD, NO
-SIGNIFICANT INCREASE OBSERVED
12:00 - 00:00 12.00 DRILL P 13,018.45 PROD1 DIRECTIONALLY DRILL 6-1J8" PRODUCTION
HOLE SECTION FROM 12387' MD TO 13018'
MD (8750' TVD)
- 631 FT IN 12.0 HRS = 52-6 FT/HR WITH
CONNECTIONS
- INSTANTANEOUS ROP 50 - 110 FPH
- 325 GPM, 2110 PSI ON/OFF BOTTOM
-150 RPM, 18 KFT-LBS TORQUE ON BOTTOM,
j 16 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS
WOB
- PU = 225 KLBS, SO = 125 KLBS, ROT = 158
KLBS
- SURVEY EVERY 90 FT
-ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED DUE TO SOFTWARE
ISSUES, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 8.7 PPG
- GAS WATCH: AVG BACKGROUND 140 UNITS,
MAX 381 UNITS
SWEEPS:
- 35 BBL LOW -VIS 135 BBL HIGH VIS TANDEM
SWEEPAT 12895' MD, 75% INCREASE IN
CUTTINGS OBSERVED
Pnnted 6/7/2018 4:43:50PM *All depths reported in Drillers Depths`
North America - ALASKA - BP
Operation Summary Report
Page 25 of 31
Common Well Name: 11-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 4/24/2018
End Date. 5/16/2018
X3 -018Y4 -C: (6,086,993.00 )
Project: PBU
Site: 11
Rig Name/No.: PARKER 272
Spud Daterrime: 7/11/1986 12:00oDAM
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23BActual @74.60usft (above Mean Sea Level)
Date From - To Him
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usft)
5/11/2018 00:00 - 12:00 12.00
DRILL P
13,617.45 PROD1
DIRECTIONALLY DRILL 6-1/8" PRODUCTION
1200 - 1600 4.00
1606 - 1836 250
HOLE SECTION FROM 13018' MD TO 13617'
MD (8731' TVD)
- 599 FT IN 12.0 HRS = 49.9 FT/HR WITH
CONNECTIONS
- INSTANTANEOUS ROP 50-100 FPH
- 325 GPM, 2275 PSI ON/OFF BOTTOM
- 150 RPM, 16 KFT-LBS TORQUE ON BOTTOM,
14 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS
WOB
- PU = 218 KLBS, SO = 126 KLBS, ROT = 158
KLBS
- SURVEY EVERY 30-90 FT AS REQUIRED
-ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS ENABLED, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 8.7+ PPG
- GAS WATCH: AVG BACKGROUND 117 UNITS,
MAX 315 UNITS
SWEEPS:
'- 35 BBL LOW -VIS / 35 BBL HIGH VIS TANDEM
SWEEP AT 13450' MD, 75% INCREASE IN
_ CUTTINGS OBSERVED
DRILL P 13,75045 PROD? DIRECTIONALLY DRILL 6-118" PRODUCTION
HOLE SECTION FROM 13617' MD TO 13750'
MD (8710' TVD)
-133 FT IN 4.0 HRS = 33.3 FT/HR WITH
CONNECTIONS
- INSTANTANEOUS ROP 50-100 FPH
- 325 GPM, 2280 PSI ON/OFF BOTTOM
- 150 RPM, 17 KFT-LBS TORQUE ON BOTTOM,
13 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS
WOB
PU = 230 KLBS, SO = 125 KLBS, ROT = 158
KLBS
- SURVEY EVERY 30-90 FT AS REQUIRED
-ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS ENABLED, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 8.7+ PPG
- GAS WATCH: AVG BACKGROUND 120 UNITS,
MAX 315 UNITS
TURNED UP TO 100° IN AN ATTEMPT TO
LOCATE RESERVOIR SANDS AGAIN.
RE-ENTERED RESERVOIR SANDSAT 13690'
MD (8722' TVD), -700' OF SHALE EXPOSED.
DISCUSSED WITH ODE AND N WD TEAM.
DECISION MADE TO OPENHOLE SIDETRACK
BACK UP AT 11287' MD.
DRILL N 13.750 45 PROD1 PULL ON ELEVATORS FROM 13750' MD TO
10520' MD, INSIDE 7" INTERMEDIATE LINER
- PU = 230 KLBS, SO = 125 KLBS AT 13750' MD
- MONITOR WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM: STATIC
- MONITOR WELL FOR 10 MIN AT 7" LINER
SHOE: STATIC
- HOLE TAKING PROPER FILL WHILE PULLING
- MUD WEIGHT IN/OUT = 8.7+ PPG
- OBSERVED OVERPULLS UP TO 35 KLBS
OVER FROM 13750' MD TO 12700' MD
Printed 6/7/2018 4:43:5oPM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 26 of 31
Common Well Name: 11-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date'. 4/24/2018 End Date. 5/16/2018
X3 -018V4 -C: (6,086,993.00 )
Project: PBU --- - ----
Site. 11 --
Rig Name/No.: PARKER 272
Spud Date/Time: 7/11/1986 12:00 OOAM
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
SPUOI: USA00001229
Active datum: 11-23BActual @74.60usR (above Mean Sea Level)
Date From - To His
Task Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
18:30 - 19:30 1.00
DRILL N 13,750.45 PROD1
CIRUCLATE IX BOTTOMS UP INSIDE 7"
INTERMEDIATE LINER
- 300 GPM, 1730 PSI
_
- MUD WEIGHT IN/OUT = 8.7+ PPG
19:30 - 20:00 0.50
DRILL N 13,750.45 PROW
INSPECT AND SERVICE TOP DRIVE AND RIG
FLOOR EQUIPMENT
2000 - 2030 0.50
STKOH N 13,750.45 PROD1
RUN IN THE HOLE ON ELEVATORS FROM
10520' MD TO OPENHOLE SIDETRACK DEPTH
AT 11287' MD AND MARK PIPE
- PU = 208 KLBS, SO = 130 KLBS AT 10520' MD
- MONITOR DISPLACEMENT WITH TRIP TANK
GOOD DISPLACEMENT
--MUD
WEIGHT IN/OUT =8.7+PPG
20:30 - 00:00 3.50
STKOH N 13,750.45 PROD1
BEGIN TROUGHING FOR OPENHOLE
SIDETRACK PER APPROVED OCN #6 AND
BAKER DIRECTIONAL PROCEDURE
- PU = 220 KLBS, SO = 120 KLBS, ROT = 160
KLBS
- 100 RPM, 14-15 KFT-LBS TORQUE
- 250 GPM, 1400 PSI ON/OFF BOTTOM
- DOWNLINK TO STEER MODE, SD = 180, SF =
100%
- REAM UP 30', REAM BACK TO MARKAT 60
FT/HR
- REAM UP 3, REAM BACK TO MARKAT 30
FT/HR
- REAM UP 6', REAM BACK TO MARKAT 30
FT/HR
- REAM UP 15', REAM BACK TO MARKAT 30
FT/HR
- REAM UP 30', REAM BACK TO MARKAT 30
FT/HR
- NO REAL INDICATIONS OF INCREASED
_
SLEEVE ROTATION
5112/2018 00.00 - 02.30 2.50
STKOH N 13,750.45 PROD1
CONTINUE TROUGHING FOR OPENHOLE
SIDETRACK PER APPROVED OCN #6 AND
BAKER DIRECTIONAL PROCEDURE
-CONTINUE TROUGHING IN INCREMENTES
DUE TO NO INDICATIONS OF INCREASED
SLEEVE ROTATION
- 100 RPM, 14-15 KFT-LBS TORQUE
- 250 GPM, 1400 PSI ON/OFF BOTTOM
- REAM UP 30', REAM BACK TO MARKAT 30
FT/HR
- REAM UP 15', REAM BACK TO MARKAT 30
FT/HR
- REAM UP 7', REAM BACK TO MARKAT 30
FT/HR
- REAM UP 6', REAM BACK TO MARKAT 30
FT/HR
02 30 - 05.00 2.50
STKOH N 13,750.45 PROD1
CONTINUE OPENHOLE SIDETRACK PER
APPROVED OCN #6 AND BAKER
DIRECTIONAL PROCEDURE
- DOWNLINK RIBS OFF ON AUTOTRAK
- REAM FROM 11257' MD TO 11287' MD (30') 3X
AT 60 FT/HR
-100 RPM, 13 KFT-LBS TORQUE
- 250 GPM, 1350 PSI ON/OFF BOTTOM
Printed 6!7/2018 4:43:50PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 27 of 31
Operation Summary Report
Common Well Name: 11-23 --- _
AFE No
Event Type: RE -ENTER -ONSHORE (RON) Start Date: 4/24/2018 End Date. 5/16/2018
X3 -018Y4 -C. (6,086,993.00 )
Project: PBU Site: 11
Rig Name/No.: PARKER 272 Spud Date7rime: 7/11/1986 12:00:00AM
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @74.60usR (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase
Description of Operations
(hr) _ (usit)
_
05:00 - 05:30 0.50 STKOH N 13,750.45 PROD1
CONTINUE OPENHOLE SIDETRACK PER
APPROVED OCN #6 AND BAKER
DIRECTIONAL PROCEDURE
- WITH RIBS OFF, SITAND ROTATE AT 1128T
MD WITH NO RECIPROCATION FOR 30 MIN
- 100 RPM, 13 KFT-LBS TORQUE
- 250 GPM, 1370 PSI ON/OFF BOTTOM
05:30 - 20:30 15.00 STKOH N 13,750.45 PROD?
BEGIN TIME DRILLING FOR OPENHOLE
SIDETRACK PER APPROVED OCN #6 AND
BAKER DIRECTIONAL PROCEDURE
- 120 RPM, 11 KFT-LBS TORQUE
1
'- 250 GPM, 1350-1240 PSI ON/OFF BOTTOM
- DRILL 0.5 FT/HR FOR 2 HRS
- DRILL 1 FT/HR FOR 4 HRS TO 11292' MD
- DRILL 2 FT/HR FOR 4 HRS TO 11300' MD
- DRILL 4 FT/HR FOR 2 HRS TO 11308' MO
- DRILL 8 FT/HR FOR 1 HRS TO 11316' MD
DRILL 16 FT/HR FOR 1 HR TO 11327' MD
- GOOD INDICATION OF SEPERATION WITH
NEAR BIT INC ^4° LESS AT 11314' MD
_
2030'. - 0000 3.50 DRILL N 13,750.45 1 PROD1
DIRECTIONALLY DRILL 6-1/8" PRODUCTION
HOLE SECTION FROM 11327' MO TO 11442' MD
(8888' TVD)
-115 FT IN 3.5 HRS =32.9 FT/HR WITH
'CONNECTIONS
-INSTANTANEOUS ROP 15-50 FPH
- 300 GPM, 1620 PSI ON/OFF BOTTOM
- 120 RPM, 12 KFT-LBS TORQUE ON BOTTOM,
9 KFT-LBS TORQUE OFF BOTTOM, 10-15 KLBS
WOB
li
- PU = 200 KLBS, SO = 140 KLBS, ROT = 162
KLBS
- SURVEY EVERY 30 FT AS REQUIRED
-ZERO LOSSES WHILE DRILLING AHEAD
- NOVOS DISABLED, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 8.6 PPG
- GAS WATCH: AVG BACKGROUND 60 UNITS,
MAX 162 UNITS _
5/13/2018 00.00 - 1200 12.00 DRILL N 13,750.45 PROD1
DIRECTIONALLY DRILL6-1/8"PRODUCTION
HOLE SECTION FROM 11442' MD TO 12103'
MD (8766' TVD)
- 661 FT IN 12.0 HRS = 55.1 FT/HR WITH
CONNECTIONS
- INSTANTANEOUS ROP 50-125 FPH
- 300-325 GPM, 1660-1905 PSI ON/OFF
BOTTOM
- 120-150 RPM, 12-15 KFT-LBS TORQUE ON
BOTTOM, 9-11 KFT-LBS TORQUE OFF
BOTTOM, 10-20 KLBS WOB
- PU = 203 KLBS, SO = 137 KLBS, ROT = 162
KLSS
- SURVEY EVERY 30-90 FT AS REQUIRED
.- LOSSES WHILE DRILLING AHEAD <5 BPH
- NOVOS ENABLED FOR <50% OF DRILLING
TIME, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 8.6 PPG
- GAS WATCH: AVG BACKGROUND 120 UNITS,
MAX 598 UNITS
Printed 6/7/2018 4:43:50PM 'All depths reported in Drillers Depths'
SWEEPS:
- 35 BBL LOW -VIS / 35 BBL HIGH VIS TANDEM
SWEEP AT 12800' MD, NO INCREASE IN
CUTTINGS OBSERVED
- 35 BBL LOW -VIS / 35 BBL HIGH VIS TANDEM
SWEEP AT 13400' MD, NO INCREASE IN
CUTTINGS OBSERVED
Printed 6/7/2018 4:43:50PM *All depths reported In Drillers Depths'
NorthAmerica- ALASKA - BP
Page 28 of 31
Operation Summary Report
Common Well Name'. 11-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date. 4/24/2018 End Date: 5/16/2018
X3 -018Y4 -C: (6,086,993.00 )
Project: PBU
Site: 11
Rig Name/No.: PARKER 272
Spud Daterrime: 7/11/1986 12:00 OOAM
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date's From - To Him
Task Code NPT Total Depth Phase
Description of Operations
(hr) -
(usft) _.
12:00 - 00:00 12.00
DRILL N 13,750.45 PROD1
DIRECTIONALLY DRILL 6-1/8" PRODUCTION
HOLE SECTION FROM 12103' MD TO 12829'
li
MD (8738' TVD)
-726 FT IN 12.0 HRS =60.5 FT/HR WITH
CONNECTIONS
-INSTANTANEOUS ROP 75-125 FPH
- 325 GPM, 2000 PSI ON/OFF BOTTOM
-150 RPM, 16 KFT-LBS TORQUE ON BOTTOM,
15 KFT-LBS TORQUE OFF BOTTOM, 15-20
KLBS WOB
- PU = 212 KLBS, SO = 126 KLBS, ROT = 161
KLBS
-SURVEY EVERY 30-90 FT AS REQUIRED
- LOSSES WHILE DRILLING AHEAD <5 BPH
'- NOVOS ENABLED, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 8.6 PPG
- GAS WATCH: AVG BACKGROUND 200 UNITS,
_ MAX 494 UNITS
5/14/2018 00:00 - 15-.30 15.50
DRILL N 13,750.00 PROD?
DIRECTIONALLY DRILL 6-1/8"PRODUCTION
HOLE SECTION FROM 12829' MD TO 13750'
MD(8716'TVD)
-921 FT IN 15.5 HRS =59.4 FT/HR WITH
CONNECTIONS
'- INSTANTANEOUS ROP 50-100 FPH
-325 GPM, 2130 PSI ON/OFF BOTTOM
-150 RPM, 16 KFT-LBS TORQUE ON BOTTOM,
15 KFT-LBS TORQUE OFF BOTTOM, 15-20
KLBS WOB
- PU = 205 KLBS, SO = 129 KLBS, ROT = 160
KLBS
- SURVEY EVERY 90 FT AS REQUIRED
-LOSSES WHILE DRILLING AHEAD <5 BPH
- NOVOS ENABLED, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 8.6+ PPG
- GAS WATCH: AVG BACKGROUND 295 UNITS,
MAX 468 UNITS
SWEEPS:
- 35 BBL LOW -VIS / 35 BBL HIGH VIS TANDEM
SWEEP AT 12800' MD, NO INCREASE IN
CUTTINGS OBSERVED
- 35 BBL LOW -VIS / 35 BBL HIGH VIS TANDEM
SWEEP AT 13400' MD, NO INCREASE IN
CUTTINGS OBSERVED
Printed 6/7/2018 4:43:50PM *All depths reported In Drillers Depths'
Common Well Name: 1-1-.23—
Event Type: RE-ENTER- ONSHORE(RON)
Proiect: PBU
North America - ALASKA - BP
Operation Summary Report
Start Date: 4/24/2018
Site: 11
End Date 5)1612018
AFE No
X3 -018Y4 -C: (6,086,993.00 )
i Rig Name/No.: PARKER 272 Spud DateRme: 7/11/1986 12'.00:OOAM I Rig Release: 5/20/2018
Active datum: 11-23B Actual (g?74.60usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth
__ _ (hr) (usft)
15:30 - 00:00 8.50 DRILL P 14,341.00
5/15/2018 00:00 - 14:30 14.50 DRILL P 15,157.00
Page 29 of 31
Phase
Description of Operations
PROD1
DIRECTIONALLY DRILL 6-1/8" PRODUCTION
HOLE SECTION FROM 13750' MD TO 14341'
MD (8685' TVD)
- 591 FT IN 8.5 HRS = 69.5 FT/HR WITH
CONNECTIONS
- INSTANTANEOUS ROP 100-125 FPH
- 325 GPM, 2170 PSI ON/OFF BOTTOM
- 150 RPM, 18 KFT-LBS TORQUE ON BOTTOM,
16 KFT-LBS TORQUE OFF BOTTOM, 15-20
KLBS WOB
- PU = 215 KLBS, SO = 125 KLBS, ROT = 155
KLBS
-SURVEY EVERY 30-90 FT AS REQUIRED
- LOSSES WHILE DRILLING AHEAD 5-8 BPH
- NOVOS ENABLED, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 8.6+ PPG
- GAS WATCH: AVG BACKGROUND 280 UNITS,
'.,
MAX 560 UNITS
SWEEPS:
'- 35 BBL HIGH VIS SWEEP AT 13937' MD, 25%
INCREASE IN CUTTINGS OBSERVED
PRODi
DIRECTIONALLY DRILL S-1/8" PRODUCTION
HOLE SECTION FROM 14341' MD TO 15157'
617' TVD
- 816 FT IN 14.5 HRS = 56.3 FT/HR WITH
CONNECTIONS
-INSTANTANEOUS ROP 75-100 FPH
- 325 GPM, 2330 PSI ON/OFF BOTTOM
-150 RPM, 19.5 KFT-LBS TORQUE ON
BOTTOM, 16 KFT-LBS TORQUE OFF BOTTOM,
15-20 KLBS WOB
- PU = 215 KLBS, SO = 130 KLBS, ROT = 154
KLBS
- SURVEY EVERY 30-90 ETAS REQUIRED
- LOSSES WHILE DRILLING AHEAD 15-20 BPH
- NOVOS ENABLED, SOFTSPEED ENABLED
- MUD WEIGHT IN/OUT = 8.6+ PPG
- GAS WATCH: AVG BACKGROUND 330 UNITS,
MAX 654 UNITS
SWEEPS:
- 35 BBL HIGH VIS SWEEP AT 14590' MD, 25%
INCREASE IN CUTTINGS OBSERVED
SIMOPS:
PERFORM WEEKLY ROPE FUNCTION TEST
BETWEEN CONNECTIONS:
CLOSING TIMES: ANNULAR = 29 SEC, UPPER
RAMS = 7 SEC, LOWER RAMS = 7 SEC,
CHOKE AND KILL HCR = 1 SEC EACH
BLIND / SHEAR RAMS TO BE FUNCTIONED
WHEN OUT OF THE HOLE
Printed SU12018 4:43:50PM *All depths reported in Drillers Depths`
Printed 617/2018 4:43:50PM 'All depths reported in Drillers Depths'
North Arnedra - ALASKA - BP
Page 30 of 31
Operation Summary Report
Common Well Name'. 11-23
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 4/24/2018 End Date. 5/16/2018
X3 -018Y4 -C: (6,086,993,00)
Project: PBU
Site: 11
Rig Name/No.: PARKER 272
Spud Date/Time: 7/11/1986 12:00:00AM
Rig Release: 520/2018
Rig Contractor: PARKER DRILLING CO.
_BPUOI: USA00001229
Active datum: 11-23B Actual qP74.60usft (above Mean Sea Level)
Date From - To Hm
Task Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
_
14:30 - 17:30 3.00
DRILL P 15,157.00 PROW
CIRCULATE 2z BOTTOMS UP TO CLEAN UP
THE HOLE AT TO
- PERFORM A 10 MIN FLOW CHECK: -20 BPH
STATIC LOSS RATE
- 325 GPM, 2250 PSI, 150 RPM, 17 KFT-LBS
TORQUE
- RACK BACK 4 STANDS TO 14776' MD WHILE
CIRCULATING
- CIRCULATE ONE 35 BBLS HIGH VIS SWEEP,
NO INCREASE IN CUTTINGS
- MUD WEIGHT IN/OUT = 8.6+ PPG
17:30 - 20:30 3.00
_
DRILL P 15,157.00 PROD?
PULL OUT OF THE HOLE ON ELEVATORS
FROM 14776' MD TO 10600' MD, INSIDE THE 7"
LINER SHOE
- MONITOR THE WELL FOR 10 MIN PRIOR TO
PULLING OFF BOTTOM: -20 BPH STATIC
,LOSS RATE
- PU = 210 KLBS, SO = 128 KLBS AT 14767' MD
- MUD WEIGHT IN/OUT = 8.6+ PPG
-HOLE TAKING PROPER FILL WHILE PULLING
- NO HOLE ISSUES OBSERVED WHILE
PULLING
VERIFY SIDETRACK JUNCTION:
!
- PICK UP TO 11197' MD (90' ABOVE
SIDETRACK JUNCTION)
- RUN BACK THROUGH SIDETRACK
JUNCTION TO 11565' MD AND SURVEY
- SURVEY DEPTH 11532' MD IN SIDETRACK
WELLBORE MATCHED PREVIOUS SURVEY AT
SAME DEPTH: 91.5° INC, 324.6* AZ
- SURVEY DEPTH 11533' MD IN ORIGINAL PB1
WELLBORE: 87.1° INC, 331.0* AZ
- GOOD INDICATION OF TRACKING INTO NEW
WELLBORE
CONTINUE PULLING OUT OF THE HOLE ON
ELEVATORS TO 10600' MD
- MONITOR WELL FOR 10 MIN AT THE 7"
SHOE: -20 BPH STATIC LOSS RATE _
20:30 - 21:30 1.00
DRILL P 15,157.00 PROW
CIRCULATE 1x BOTTOMS UP AT THE 7" LINER
SHOE
- 325 GPM, 1800 PSI
- 100 RPM, 6 KFT-LBS TORQUE
-MUD WEIGHT IN/OUT =8.6+PPG
X21:30 - 00:00 2.50
DRILL P 15,157.00 PROD1
PULL OUT OF THE HOLE ON ELEVATORS
FROM 10600' MD TO 6150' MD
- MONITOR THE WELL FOR 10 MIN: -20 BPH
STATIC LOSS RATE
- PU = 210 KLBS, SO = 128 KLBS AT 14767' MD
- MUD WEIGHT IN/OUT = 8.6+ PPG
- HOLE TAKING PROPER FILL WHILE PULLING
- DROP 2.375" OD HOLLOW DRIFTAT 10460'
MD
Printed 617/2018 4:43:50PM 'All depths reported in Drillers Depths'
Printed 6/7/2018 4,43 5OPM •All depths reported in Drillers Depths'
North Arnenca - ALASKA- BP
Page 31 of 31
Operation Summary Report
— - - - --
Common Well Name: 11-23
- -
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 4/24/2018 End Dale: 5/1612018
X3 -018Y4 -C. (6,086,993.00 )
Project: PBU
Site: 11
Rig Name/No.: PARKER 272
Spud DatefTme: 7/11/1986 12:00:OOAM
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual C74.60usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT Total Depth Phase
Description of Operations
(hr)
--03:00
(usft)
5/16/2018 00:00 3.00
DRILL P 15,157.00 PROD1
CONTINUE TO PULL OUT OF THE HOLE ON
ELEVATORS FROM 6150' MD TO 151' MD
- PU = 130 KLBS, SO = 100 KLBS AT 6150' MD
-MUD WEIGHT IN/OUT=8.6+PPG
- HOLE TAKING PROPER FILL WHILE PULLING,
- MONITOR THE WELL FOR 10 MIN AT THE
HWDP: -20 BPH STATIC LOSS RATE
- LAY DOWN THE HWDP AND JARS TO THE
PIPE SHED
- RE -DROP THE 2.375" OD HOLLOW DRIFT
AFTER LAYING DOWN THE JARS
03:00 - 05:00 2.00
DRILL P 15,157.00 PRODi
LAY DOWN BHA#5, 6-1/8" RSSASSEMBLY
PER BAKER DIRECTIONAL AND MWD
REPRESENTATIVES
- MONITOR THE WELL FOR 10 MIN PRIOR TO
PULLING THE BHA THROUGH THE STACK -15
BPH STATIC LOSS RATE
- HOLE TAKING PROPER FILL WHILE PULLING
- MUD WEIGHT IN/OUT = 8.6+ PPG
- FUNCTION BLIND / SHEAR RAMS TO
COMPLETE WEEKLY FUNCTION TEST = 15
SEC TO CLOSE
GRADE: e-6-Wi-A-X-I-BT_-T_D__ _
0500 - 0600 1.00
DRILL P 15,157 00 PRODt
_-BIT
CLEAN AND CLEAR RIG FLOOR
-
MOBILIZE DOYON CASING TONGS AND
HANDLING EQUIPMENT TO RIG FLOOR
START CON EVENT
Printed 6/7/2018 4,43 5OPM •All depths reported in Drillers Depths'
Common Well Name. 11-23
Phase Description of Operations
Event Type. COM- ONSHORE (CON)
_SO_=76 _
Project. PBU
RUNPRD RIG UP TO RUN LINER
Rig Name/No.: PARKER 272
- RIG UP DOYON CASING TONGS WITH
Rig Contractor: PARKER DRILLING CO.
TORQUE TURN EQUIPMENT
Active datum'. 11-23B Actual @74.60usfl (abovr
Date From - To
Him
'- MAKE UP VAMTOP HC XO TO FOSV ON RIG
(hr)
5116/2018 06:00 - 06:30
0.50
06'.30 - 1430 8.00
North America - ALASKA - BP Page 1 of 10
Operation Summary Report
AFE No
Start Date'. 5/16/2018 End Date. 5/20/2018 X3 -018Y4 -C: (2,588,604.00)
Site: 11
BPUOI: USAD0001229
Sea Level)
Task Code NPT Total Depth
Phase Description of Operations
(usft)
_SO_=76 _
CASING P 15,157.00
RUNPRD RIG UP TO RUN LINER
- RIG UP DOYON CASING TONGS WITH
TORQUE TURN EQUIPMENT
- RIG UP 4-1/2" HANDLING EQUIPMENT
CASING P 15,157.00
'- MAKE UP VAMTOP HC XO TO FOSV ON RIG
FLOOR
_-
VERIFY LINER COUNT IN PIPE SHED
CASING P 15,157.00
RUN PRD RUN 4-1/2", 12.6#, 13CR85 VAMTOP
PRODUCTION LINER TO 4680'
- FLOW CHECK WELL PRIOR TO RUNNING IN
HOLE (-10 BPH STATIC LOSS RATE)
- MAKE UP SHOE TRACK (BAKERLOK
•
CONNECTIONS) AND CHECK FLOATS (PASS)
- APPLY JET -LUBE SEAL GUARD DOPE
- MUD WEIGHT IN/OUT = 8.6+ PPG
- TORQUE TURN ALL VAMTOP CONNECTIONS
- PU = 283 KLBS, SO = 105 KLBS
CASING P 15,157.00
• TO OPT MU TORQUE 4440 FT -LBS. MAKE UP
JOINTS WITH DOUBLE STACK TONGS.
- VAM REPRESENTATIVE VERIFY
TORQUE -TURN GRAPHS AND INSPECT
CONNECTIONS, ALL CONNECTIONS GOOD
- RUN (217) 4-1/2" X 5-3/4" CENTRALIZERS
(SHOE TRACK, SPACEOUT PUP, 2 PER JOINT
ON 1-106 AND 109-110). ONE FLOATING
BETWEEN STOP RINGS 4' AND 10' FROM PIN,
AND ONE LOCKED DOWN 13' FROM BOX.
- FILL LINER EVERY 20 JTS
- MUD WEIGHT IN/OUT = 8.6+ PPG
- PU = 75 KLBS, SO = 72 KLBS AT 4680' MD
14:30 - 15:00 0.50 CASING P 15,157.00 RUNPRD MAKE UP WEATHERFORD LINER HANGER /
LINER TOP PACKER ASSEMBLY AND CROSS
OVER TO 4" DRILL PIPE
I -CHANGE FROM 4-1/2" TO 4" ELEVATORS
15:00 - 15:30 I 0.50
1530 - 1900 3.50
19:00 - 19:30 0.50
Printed 6(//2018 4:44:17PM *All depths reported in Drillers Depths'
-PU=80 KLBS, KLBS
___
_SO_=76 _
CASING P 15,157.00
RUNPRD FILL PI PE AND CIRCULATE FULL LINER
VOLUME
- 6 BPM, 225 PSI
- MUD WEIGHT IN/OUT = 8.6+ PPG
CASING P 15,157.00
RUNPRD RUN IN HOLE WITH 4-1/2", 12.611, 13CR85,
VAMTOP PRODUCTION LINER ON 4" DRILL
PIPE FROM 4680' MD LINER OVERALL
LENGTH TO 10600' MD (JUST INSIDE 7" LINER
SHOE)
- FILL PIPE EVERY 20 STANDS
- MONITOR DISPLACEMENT ON W/ TRIP
TANK: 5-10 BPH LOSSES OBSERVED WHILE
RUNNING IN HOLE (FINAL VALUE TO BE
REPORTED AT END OF RUN)
- MUD WEIGHT IN/OUT = 8.6+ PPG
- PU = 283 KLBS, SO = 105 KLBS
CASING P 15,157.00
RUNPRD CIRCULATE 1.5x DRILL PIPE +LINER VOLUME
AT 7" SHOE
- STAGE UP PUMPS TO 6 BPM, 745 PSI, NO
PIPE MOVEMENT
- MUD WEIGHT IN/OUT= 8+6+ PRIG
Printed 6(//2018 4:44:17PM *All depths reported in Drillers Depths'
Printed 6/72018 4:44:17PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 2 of 10
Operation Summary Report
Common Well Name. 11-23
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 5/16/2018 End Date 5/20/201 B
X3-018Y4-C: (2,588,604.00 )
Project: PBU
Site: 11
Rig Name/No.: PARKER 272
Spud Date/Time: 7/11/1986 12:00:OOAM
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To HIM
Task Code NPT Total Depth Phase
Desenption of Operations
19:30 - 23:00 3.50
CASING P 15,157.00 RUNPRD
RUN IN THE HOLE WITH 4-12", 12.6#, 13CR85,
VAMTOP PRODUCTION LINER ON 4" DRILL
PIPE IN OPEN HOLE FROM 10600' MD (7"
SHOE) TO LINER SETTING DEPTH OF 15155'
MD
- NO ISSUES RUNNING IN THROUGH
OPENHOLE AND NO FILL ON BOTTOM
- MONITOR DISPLACEMENT ON W/ TRIP
TANK:3 BPH LOSSES OBSERVED WHILE
RUNNING IN OPEN HOLE
- RUNNING SPEED = 90 FPM
- MAKE UP CEMENT HEAD AND TAG BOTTOM
AT 15157' MD, PICK UP 2' OFF BOTTOM TO
SETTING DEPTH 15155' MD
- PU = 216 KLBS, SO = 121 KLBS
- TOTAL LOSSES WHILE RUNNING LINER = 25
BBLS
23:00 - 00:00 1.00
CASING P 15,15200 RUNPRD
STAGE UP TO CEMENTING RATE IN 1 BPM
INCREMENTS
SEE NEXT DAYS REPORT FOR DETAILS
5/17/2018 00:00 - 03:00 3.00
CASING P 15,15200 RUNPRD
STAGE UPTO CEMENTING RATE IN BPM
INCREMENTS
-STAGE UP OVER 2 HOURS TO 7 BPM, 1550
PSI
-UNABLE TO RECIPROCATE PIPE
-CIRCULATING PRESSURES AT 7 BPM
APPROACHED 1600 PSI LIMIT
- REDUCE RATE AND STAGE BACK UP TOS
BPM 1075 PSI ICP, 1025 PSI FCP
- CONDITION MUD TO 8.6 PPG, 15 YIELD
POINT
- CIRCULATE A TOTAL OF 2X BOTTOMS UP
SIMOPS:
- RIG UP SLB CEMENTERS AND HOLD PJSM
FOR CEMENTING
Printed 6/72018 4:44:17PM *All depths reported in Drillers Depths'
North America - ALASKA - Bld
Operation Summary Report
Common Well Name. 11-23
Event Type: COM- ONSHORE (CON) Start Date: 5/16/2018 End Date. 5/20/2018
Project: PBU Site: 11
Rig Name/No.: PARKER 272 Spud Date/rime: 7/11/1986 12:00:00AM
Active datum: 11-238 Actual @74.60usft (above Mean Sea Level
Date From - To His Task Code NPT
(hr)
0300 - 0600 3.00 CEMT P
0600 - 0800 2.00
0800 - 1200 4.00
CEMT P
CEMT P
12:00 - 13:00 1.00 CEMT P
13:00 - 14:30 1.50 PERFOS P
Page 3 of 10
AFE No
X3 -018Y4 -C'.(2,588,604.00)
Rig Release: 5/20/2018
BPUOI: USA00001229
Total Depth Phase
Description of Operations
(usft)
PUMPED BY SLB CEMENTERS
15,157.00 RUNPRD
CEMENT4-1/2" PRODUCTION LINERAS
FOLLOWS:
- FILL LINES AND PRESSURE TEST TO 4500
PSI FOR 5 MINUTES: GOOD TEST
- PUMP 30 BBLS OF 12 PPG MUDPUSH II
SPACER AT 4 BPM, 500 PSI
- PUMP 115 BBLS (600 SKS) OF 15.8 PPG
CLASS G TAILAT 5 BPM, 220 PSI, 30%
L�l7
CESS VOLUME (YIELD 1.11 CU.FT/SK_
��JJJ
- FLUSH CENT LINES WITH SEAWATER
- RELEASE DRILL PIPE WIPER DART
Printed 6x7/2018 4:44:17PM *All depths reported in Drillers Depths"
PERFORM DISPLACEMENT WITH SEAWATER
PUMPED BY SLB CEMENTERS
-95 BELS DISPLACED AT BPM: ICP 920 PSI,
FCP 1450 PSI
- 11 BBLS DISPLACED AT 3 BPM: ICP 550 PSI,
FCP 720 PSI
- OBSERVE LATCH AT 106.1 BBLS DISPLACED
AND SHEAR AT 1690 PSI
'- 61 BELS DISPLACED AT 5 BPM: ICP 1490 PSI,
FCP 2360 PSI
'- REDUCE RATE TO 2 BPM PRIOR TO PLUG
BUMP: FINAL CIRCULATING PRESSURE OF
1510 PSI
- TOTAL DISPLACEMENT VOLUME 177.8 BELS
OF 8.5 PPG SEAWATER
X40 LOSSES FROM CEMENT EXIT SHOE TO
_CEMENT IN PLA E
- CEMENT IN PLACE AT 05:48 HRS
15,157.00
RUNPRD SET LINER HANGER AND LINER TOP PACKER
PER WEATHERFORD REPRESENTATIVE
- INCREASE PRESSURE TO 2500 PSI FOR SET
HANGER AFTER PLUG BUMP
- BLEED OFF AND CHECK FLOATS: GOOD
- SET DOWN 50 KLBS AND CONFIRM HANGER
SET
- PICK UP AND EXPOSE DOG SUB
- SET BACK DOWN ON LINER WITH 50 KLBS
AND 15 RPM
- PICK UP TO CLEAR PACK -OFF AND
CIRCULATE OUT EXCESS CEMENT OFF LINER
TOP
- PULL RUNNING TOOLABOVE LINER AND
MARK NO-GO
-CIRCULATE ix BOTTOMS UPAT 16 BPM,
DISPLACING WELL FROM 8.6 PPG
QUICKDRIL-N TO 8.5 PPG SEAWATER
--27 BELS OF EXCESS CEMENT TO SURFACE
AT BOTTOMS UP
-LAYDOWN NT HEAD
15,157.00
RUNPRD PULLOUT OF THE HOLE WITH LINER
RUNNING TOOLON ELEVATORS FROM 10441'
MD TO SURFACE
- MONITOR WELL FOR 10 MIN: STATIC
- PU = 195 KLBS, SO = 125 KLBS AT 10440' MD
- LAY DOWN LINER HANGER RUNNING TOOLS
15,157.00
RUNPRD CLEAN AND CLEAR RIG FLOOR
15,157.00
OTHCMP SLIPAND CUT 94' OF DRILL LINE
SERVICE TOP DRIVE, BLOCKS, CROWN AND
RIG FLOOR EQUIPMENT
Printed 6x7/2018 4:44:17PM *All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 4 of 10
Common Well Name: 11-23
AFE No
Event Type. COM- ONSHORE (CON)
Start Date: 5/16/2018 End Date. 5/20/2018
X3 -018Y4 -C: (2,588,604.00 )
Project: PBU
Site. 11
-
Rig Name/No.: PARKER 272
Spud DateRme: 7/11/1986 12:00 OOAM
Rig Release: 5/20/2018
Rig Contractor PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @74 60usft (above Mean Sea Level)
Date From - To His
Task Code NPT Total Depth Phase
Description of Operations
(hr)
_ _ _ Waft) _
1430 - 1500 0.50
PERFOB P 15,157.00 OTHCMP
RIG UP TO RUN PERFORATING GUNS WITH
HALIBURTON TCP SPECIALISTS
- MAKE UP XO TO FOSV AND SAFETY JOINT
- RIG UP HALLIBURTON TCP RUNNING
_
EQUIPMENT ON RIG FLOOR
15:00 - 19:00 4.00
PERFOB P 15,157.00 OTHCMP
MAKE UP AND RUN IN THE HOLE WITH
HALLIBURTON 2-3/4" JRC VANN GUNS W/
MAXFIRE E -FIRE HEAD TO 3288' MD PER HES
RUNNING ORDER
- PRE JOB SAFETY MEETING WITH RIG CREW
AND HALLIBURTON TCP CREW
-MONITOR DISPLACEMENT WITH TRIP TANK
- PU = 55 KLBS, SO = 50 KLBS AT 3288' MD
19:00 - 19:30 0.50
PERFOB P 15,157.00 OTHCMP
RIG UPTO RUN 2-7/8" PAC DRILL PIPE
- RIG UP DOYON CASING TONGS
_
1930 - 2130 2.00
PERFOB P 15,157.00 OTHCMP
PICK UP 2-7/8" PAC DRILL PIPEAND RUN IN
THE HOLE WITH PERFORATING GUNS ON
PAC PIPE FROM 3288' MD TO 4864' MD
-MONITOR DISPLACEMENT WITH TRIP TANK
- PU = 75 KLBS, SO = 65 KLBS AT 4864' MD
21:30 - 00:00 2.50
PERFOB P 15,157.00 07HCMP
RUN IN THE HOLE WITH PERFORATING GUNS
ON 4" DRILL PIPE STANDS FROM 4684' MD TO
11000' MD
- MONITOR DISPLACEMENT WITH TRIP TANK
- PU = 150 KLBS, SO = 105 KLBS AT 11000' MD
5/18/2018 00:00 - 01:30 1.50
' PERFOB P 15,157.00 OTHCMP
PRESSURE TEST 4-1/7PRODUCTION LINER
70 3500 PSI FOR 30 CHARTED
_ - LOST < 10 PSI OVER THE ENTIRE TEST
- TEST MET BP TEST CRITERIA
- SEE ATTACHED TEST CHART
01:30 - 04:00 2.50
PERFOB P 15,157.00 OTHCMP
CONTINUE RUNNING IN THE HOLE WITH
PERFORATING GUNS ON 4" DRILL PIPE
STANDS FROM 11000' MD TO 14852' MD
-MONITOR DISPLACEMENT WITH TRIP TANK
- SEAWATER: 8.5 PPG IN/OUT
- TAG AT 14852' MD WITH 5 KLBS
- SET DOWN WITH 15-20 KLBS SEVERAL
TIMES AND ATTEMPT TO WORK THOUGH
WITHOUT SUCCESS
- NOTIFY ODEAND WSUP OF TAG DEPTH '.
- PU = 206 KLBS, SO = 115 KLBS AT 14852' MD
04.00 - 09'.30 5.50
PERFOB N 15,157.00 OTHCMP
WORK PIPE AND PERFORATING GUNS FROM
14852' MD TOO 15036' MD
-VERIFY LINER, DRILL PIPEAND GUN TALLYS
- MONITOR DISPLACEMENT WITH TRIP TANK
- SEAWATER: 8.5 PPG IN/OUT
- WORK STRING WITH 10-20 KLBS THROUGH
TIGHT SPOTS PULLING FREE UP EVERY
STROKE
- TAG AT 15036' MD AND UNABLE TO WORK
PIPE BEYOND THIS DEPTH
-CONFIRM DEPTHS WITH TALLYS AND PIPE
COUNTS
- DISCUSS WITH ANCHORAGE TEAM
Printed 67/2018 4:44:17PM "All depths reported in Drillers Depths`
Common Well Name: 11-23
Event Type: COM- ONSHORE (CON)
Protect: PBU
North America - ALASKA - Blo Page 5 of 10
Operation Summary Report
AFE No
End Date: 5/20/2018 X3 -018X4 -C. (2,588,604 00 )
Start Date: 5/16/2018
Site: 11
Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To Hire Task Code NPT Total Depth Phase Description of Operations
(hr) (usft)
09:30 - 10:30 1.00 PERFOB P 15,157.00 OTHCMP SPACE OUT PERFORATING GUNSAND
PERFORATE WELL WITH HALLIBURTON 2-3/4"
JRC VANN GUNS W/ MAXFIRE E -FIRE HEAD
PER HALLIBURTON PROCEEDURE
- PICK UP TO UP WEIGHT, 210 KLBS, AND
PULL UP 150' TO SPACE OUT GUNS AT 14880'
MD
-CLOSE ANNULAR PREVENTER
- FOLLOW PRESSURE UP/BLEED OFF
SEQUENCE TO FIRE WITH MAXFIRE HEAD
- PRESSURE UP DOWN DRILLPIPE AGAINST
'ANNULAR PREVENTER
- HELD 120 PSI BACK PRESSURE AND
OBSERVED PRESSURE DROP TOO PSI
AFTER GUNS FIRED.
2705'NET PERFS ACROSS 7 INTERVALS IN
ZONEIASANDS
- 11630' MD - 12100' MD (470')
- 12200' MD - 12500' MD (300')
- 12520' MD - 12680' MD (160')
- 12700' MD - 13050' MD (350')
P - 13200' MD - 13840' MD (640')
1 - 13970' MD - 14630' MD (660')
- 14760' MD - 14885' MD (125')
- WELL ON SIGNIFICANT LOSSES AFTER
FIRING, ESTIMATED -80-100 BPH INITIAL
STATIC LOSS RATE.
2-3/4" JRC VANN GUN DESCRIPTIONS, GUN
SWELL 2.915":
-6 SPF, 60° DEG PHASING, 2.75" MILLENNIUM
15 GRAM CHARGES, 26" PENETRATION, 0.30"
_ ENTRY HOLE DIAMETER
10:30 - 15:00 4.50 PERFOB P 15,157.00 OTHCMP PULL OUT OF THE HOLE ON ELEVATORS
WITH 2-3/4" PERFORATING ASSEMBLY ON 4"
DRILL PIPE
PULL FROM 14880' MD TO SAFETYABOVE
4-1/2" LINER TOP AT 10550' MD
- PU = 210 KLBS, SO = 117 KLBS AT 14880' MD
- MONITOR WELL FOR 10 MIN AT 10550' MD
TO DETERMINE STATIC LOSS RATE: 35 BPH
- SEAWATER: 8.5 PPG IN/OUT
CONTINUE PULLING OUT OF THE HOLE ON
ELEVATORS WITH 2-3/4" PERFORATING
ASSEMBLY
- FROM 10550' MD TO 4864' MD
- MONITOR DISPLACEMENT WHILE PULLING
OUT OF THE HOLE: 30 BPH STATIC LOSS
RATE
SIMOPS:
- LAY DOWN 4" DRILL PIPE STANDS OFFLINE
WHILE PULLING OUT OF THE HOLE
Printed 6/7/2018 4:44:17PM *All depths reported in Drillers Depths'
-RIG UP DOYON CASING TONGS AND
_ _TORQUE TURN EQUIPMENT
2330 - 0000 0.50 RUNCOM P 15,157.00 RUNCMP MAKE UP WLEG, XN NIPPLE W/ RCH-M, JT W
AND HALLIBURTON TNT PACKER TO 99' MD
- BAKERLOKALL CONNECTIONS BELOW
PACKER
- MAINTAIN CONTINOUS HOLE FILL: STATIC
LOSS RATE 20 BPH
- SEAWATER: 8.5 PPG IN/OUT
Printed 6/7/2018 4:44:17PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Page 6 of 10
Operation Summary Report
Common Well Name. 11-23
APE No
Event Type: COM- ONSHORE (CON)
Start Date: 5/16/2018 End Date. 5/20/2018
X3 -018Y4 -C'. (2,588,604.00 )
Project: PBU
Site: 11
Rig Name/No.: PARKER 272
Spud Date/Time: 7/11/1986 12:00 OOAM
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @374.60usft
(above Mean Sea Level)
Date From - To
Hrs
Task Code NPT Total Depth Phase
Description of Operations
(hr)
_ (usft)
15:00 -__17:30
2.50
PERFOB P 15,157.00 OTHCMP
PULLOUT OF THE HOLE WITH 3-3/4"
PERFORATING ASSEMLY, LAYING DOWN
2-7/8" PAC DRILL PIPE
- FROM 4864' MD TO TOP OF GUNS AT 3280'
MD
- MONITOR DISPLACEMENT WHILE PULLING
OUT OF THE HOLE: 20 BPH STATIC LOSS
RATE
- SEAWATER: 8.5 PPG IN/OUT
17:30 - 21:00
3.50
PERFOB P 15,157.00 OTHCMP
PULLAND LAY DOWN 2-3/4" PERFORATING
GUNS PER HALLIBURTON TCP PROCEDURE
FROM 3280' MD
I
-MONITOR DISPLACEMENT WHILE PULLING
OUT OF THE HOLE: 20 BPH STATIC LOSS
RATE
- SEAWATER: 8.5 PPG IN/OUT
-ALL GUNS FIRED
21:00 - 2300
2.00
PERFOB P 15,157.00 OTHCMP
RIG DOWN PERFORATING GUN HANDLING
EQUIPMENTAND CLEAN AND CLEAR RIG
FLOOR
- PULL WEAR BUSHING
- FLUSH BOP STACK
-MAINTAIN CONTINOUS HOLE FILL: STATIC
LOSS RATE 20 BPH
-SEAWATER: 8.5 PPG IN/OUT
23:00 - 23:30
0.50
RUNCOM P 15,157.00 RUNCMP
RIG UP TO RUN 4-112",12.6# VAMTOP
COMPLETION PER APPROVED TUBING TALLY
-
- VERIFY PIPE COUNTAND JEWELRY LAYOUT
IN PIPE SHED
-RIG UP DOYON CASING TONGS AND
_ _TORQUE TURN EQUIPMENT
2330 - 0000 0.50 RUNCOM P 15,157.00 RUNCMP MAKE UP WLEG, XN NIPPLE W/ RCH-M, JT W
AND HALLIBURTON TNT PACKER TO 99' MD
- BAKERLOKALL CONNECTIONS BELOW
PACKER
- MAINTAIN CONTINOUS HOLE FILL: STATIC
LOSS RATE 20 BPH
- SEAWATER: 8.5 PPG IN/OUT
Printed 6/7/2018 4:44:17PM *All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Common Well Name. 11-23
Event Type: COM -ONSHORE (CON)
Phase Description of Operations
Start Date'. 5/16/2018
Project: PBU
15,157.00
Site: 11
Rig Name/No.: PARKER 272
COMPLETION TUBING FROM 99' MD TO 10446'
Spud DateRme: 7/11/1986
Rig Contractor. PARKER DRILLING CO.
- BAKERLOKALL CONNECTIONS BELOWTHE
Active datum: 11-23B Actual @74.60usft
(above Mean Sea Level)
Date From - To
Hm
Task Code NPT
VAMTOP THREADS
(hr)
- TORUE TURN VAMTOP CONNECTIONS TO
5/19/2018 0000 - 1400
14.00
RUNCOM P
1400 - 1600 2.00 RUNCOM P
Page 7 of 10
AFE No
End Date 5/2012018 X3 -018Y4 -C (2,588,604.00)
Rig Release: 520/2018
Total Depth
Phase Description of Operations
(usft)__
15,157.00
RUNCMP RUN 4-1/2", 12.6111, 13CR, VAMTOP
COMPLETION TUBING FROM 99' MD TO 10446'
MD. SPACE OUTAND LAND TUBING HANGER
- BAKERLOKALL CONNECTIONS BELOWTHE
PACKER
- APPLY BEST -O -LIFE 4010 TO PREMIUM
VAMTOP THREADS
- TORUE TURN VAMTOP CONNECTIONS TO
OPT MU TRO OF 4440 FT -LBS. VAM REP ON
LOCATION TO INSPECT THREADS AND
WITNESS MAKEUP
- RUNNING SPEED = 90 FPM, AVERAGE 22
JOINTS PER HOUR
- FINAL PICKUP/SLACKOFF WEIGHTS =
157/105 KLBS (P272 TOP DRIVE+ BLOCKS =
35 KLBS)
- SEE ATTACHED EXCEL TALLY
- SEAWATER: 8.5 PPG IN/OUT (CONTINUOUS
CIRCULATION OVER TOP):
- 10-15 BPH LOSS RATE WHILE RUNNING IN
THE HOLE
- TOTAL LOSSES WHILE RUNNING IN THE
'HOLE: 134 BBLS
:- CAMERON REP TORQUE GLAND NUTS TO
' 500 FT -LBS + LOCKDOWN SCREWS TO 450
FT -LBS
SPACEOUT NOTES:
- TAG BASE OF LINER PBR AT 3.5' IN ON
JOINT #244
- LAYDOWN JOINTS 244, 243, 242, AND 241
- PICKUP SPACEOUT PUPS 19.94', 9.89' AND
3.83', JOINT 241 AND HANGER.
- RUN IN HOLE AND LAND HANGER WITH
WLEG AT 10446' MD (5' INTO LINER TOP PBR,
6' OFF LINER TOP NO-GO)
SIMOPS:
-LAYDOWN 4" DRILLPIPE WITH OFFLINE
EQUIPMENT
15,157.00 RUNCMP REVERSE IN COMPLETION FLUIDS
-4 BPM, 450 PSI
- PUMP 235 BBLS CORROSION INHIBITED
SEAWATER
- CHASE WITH 175 BBLS CLEAN SEAWATER
- PUMP 5 BBLS THE LONG WAY TO FLUSH
RHC -M PLUG
SIMOPS:
-RIG DOWN 4-12" COMPLETION RUNNING
TOOLS
Printed 6x7/2018 4:44:17PM *All depths reported in Drillers Depths'
3500 PSI 4-1 /2" TUBING TEST:
-PRESSURE CROSSCHECK COMPLETED
- TEST WITH 8.5 PPG SEAWATER, 60-F
- PRODUCTION PACKER SET DURING
PRESSURE UP
- STARTING PRESSURE = 3790 PSI
- PRESSUREAFTER 15 MIN = 3790 PSI
- PRESSURE AT 30 MIN = 3790 PSI
- BBLS TO PRESSURE UP = 2.5 BBLS
- BBLS BLED BACK = 2.5 BBLS
- DS11 AMBIENT TEMP = 25°F
- ESTIMATED BOTTOM HOLE TEMP = 176 °F
3500 PSI INNER ANNULUS AND PRODUCTION
PACKER TEST:
- PRESSURE CROSSCHECK COMPLETED
- TEST WITH 8.5 PPG SEAWATER, 60OF
- 2000 PSI HELD ON TUBING DURING TEST
(TO PREVENT SHEAR OF UPPER GLM)
- STARTING PRESSURE = 3775 PSI
- PRESSURE AFTER 15 MIN = 3775 PSI
- PRESSURE AT 30 MIN = 3775 PSI
- BBLS TO PRESSURE UP = 5.5 BBLS
- BBLS BLED BACK= 5.5 BBLS
- DS11 AMBIENT TEMP = 25°F
-ESTIMATED BOTTOM HOLE TEMP =176°F
PRESSURE TESTS APPROVED BY WSUP
SEE ATTACHED TEST CHARTAND TEST
CRITERIA CALCULATORS
PRESSURE UP ON TUBING TO 3500 PSI AND
BLEED OFF QUICKLY TO SHEAR DCK VALVE
IN UPPER GLM
VERIFY CIRCULATION BOTH WAYS AT 2 BPM:
85/560 PSI
19:00 - 22:00 3.00 RUNCOM P 15,157.00 RUNCMP FREEZE PROTECT TUBING AND IA WITH 90°F
6.8 PPG DIESEL TO 2200' MD/TVD
-REVERSE 151 BBLS INTO IA WITH FREEZE
PROTECT PUMP; 2.5 BPM, 700 PSI
- U -TUBE DIESEL FROM IATO TUBING FOR
ONE HOUR. CONFIRM NO FLOW, NO
PRESSURE AT END OF U -TUBE
- TOTAL DIESEL IN TUBING = 34 BBLS, TOTAL
IN IA= 117 BBLS
SIMOPS:
- RIG DOWN RIG FLOOR EQUIPMENT
- BLOW DOWN TOP DRIVE
- CHANGE SAVER SUB TO NC50 FOR NEXT
WELL
- RIG DOWN MUD LINES
Printed 6/7/2018 4:44:17PM •AII depths reported in Drillers Depths'
North America - ALASKA - BP
Page 8 or 10
Operation Summary Report
Common Well Name: 11-23
AFE No
Event Type'. COM- ONSHORE(CON)
Start Date. 5/16/2018 End Date: 5/202018
X3-01BY4-C:(2,588.604.00)
Project: PBU
Site: 11
'
Rig Name/No.: PARKER 272
Spud Date/Time: 7/11/1986 12:00:00AM
Rig Release: 5/20/2016
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To Him
Task Code NPT Total Depth Phase
Description of Operations
(hr)
_ _ (usft)
1600 - 1900 3.00
RUNCOM P 15,157.00 RUNCMP
DROP BALLAND RODANDALLOW TO LAND
ON SEAT ON RHC -M PLUG. PRESSURE UP
AND SET HALLIBURTON'TNT' PRODUCTION
PACKER PER HALLIBURTON
REPRESENTATIVE AND PRESSURE TEST
TUBING AND IA TO 3500 PSI FOR 30 CHARTED
MIN EACH. BOTH TESTS PASS PER BP
Z1 I LKIA am
3500 PSI 4-1 /2" TUBING TEST:
-PRESSURE CROSSCHECK COMPLETED
- TEST WITH 8.5 PPG SEAWATER, 60-F
- PRODUCTION PACKER SET DURING
PRESSURE UP
- STARTING PRESSURE = 3790 PSI
- PRESSUREAFTER 15 MIN = 3790 PSI
- PRESSURE AT 30 MIN = 3790 PSI
- BBLS TO PRESSURE UP = 2.5 BBLS
- BBLS BLED BACK = 2.5 BBLS
- DS11 AMBIENT TEMP = 25°F
- ESTIMATED BOTTOM HOLE TEMP = 176 °F
3500 PSI INNER ANNULUS AND PRODUCTION
PACKER TEST:
- PRESSURE CROSSCHECK COMPLETED
- TEST WITH 8.5 PPG SEAWATER, 60OF
- 2000 PSI HELD ON TUBING DURING TEST
(TO PREVENT SHEAR OF UPPER GLM)
- STARTING PRESSURE = 3775 PSI
- PRESSURE AFTER 15 MIN = 3775 PSI
- PRESSURE AT 30 MIN = 3775 PSI
- BBLS TO PRESSURE UP = 5.5 BBLS
- BBLS BLED BACK= 5.5 BBLS
- DS11 AMBIENT TEMP = 25°F
-ESTIMATED BOTTOM HOLE TEMP =176°F
PRESSURE TESTS APPROVED BY WSUP
SEE ATTACHED TEST CHARTAND TEST
CRITERIA CALCULATORS
PRESSURE UP ON TUBING TO 3500 PSI AND
BLEED OFF QUICKLY TO SHEAR DCK VALVE
IN UPPER GLM
VERIFY CIRCULATION BOTH WAYS AT 2 BPM:
85/560 PSI
19:00 - 22:00 3.00 RUNCOM P 15,157.00 RUNCMP FREEZE PROTECT TUBING AND IA WITH 90°F
6.8 PPG DIESEL TO 2200' MD/TVD
-REVERSE 151 BBLS INTO IA WITH FREEZE
PROTECT PUMP; 2.5 BPM, 700 PSI
- U -TUBE DIESEL FROM IATO TUBING FOR
ONE HOUR. CONFIRM NO FLOW, NO
PRESSURE AT END OF U -TUBE
- TOTAL DIESEL IN TUBING = 34 BBLS, TOTAL
IN IA= 117 BBLS
SIMOPS:
- RIG DOWN RIG FLOOR EQUIPMENT
- BLOW DOWN TOP DRIVE
- CHANGE SAVER SUB TO NC50 FOR NEXT
WELL
- RIG DOWN MUD LINES
Printed 6/7/2018 4:44:17PM •AII depths reported in Drillers Depths'
Common Well Name. 11-23
Event Type: COM- ONSHORE (CON)
Project: PBU
NorthAmerica- ALASKA - BP
Operation Summary Report
Start Date. 5/16/2018 End Date: 520/2018
Site: 11
Active datum. 11-238 Actual @74.60usft (above Mean Sea Level)
Page 9 of 10
AFE No
K3 -018Y4 -C'. (2,588.60400)
Rig Release: 5/20/2018
BPUOI: USA00001229
Date From - To Ars Task Code NPT Total Depth
Phase Description of Operations
(Ing (usft)
22:00 23:00 1.00 WHSUR P 15,157.00
RUNCMP CAMERON REPRESENTATIVE SET 4"CIW
TYPE H TWC IN TUBING HANGER WITH DRY
ROD.
- PRESSURE TEST TWC FROM BELOW WITH
DIESEL TO 3500 PSI FOR 5 CHARTED MIN:
. GOOD TEST
- SEE ATTACHED TEST CHART
23:00 - 00:00 1.00 RIGID P 15,157.00'i
RUNCMP BLOW DOWN AND RIG DOWN ALL SURFACE
LINES AND EQUIPMENT.
_
CLEAN FLOW B_OXAND DRIP PANS.
520/2018 00:00 - 03:30 3.50 BOPSUR P 15,157.00
RUNCMP NIPPLE DOWN BOPEAND HIGH PRESSURE
RISERS
- LAY DOWN RISERS TO PIPE SHED AND SET
SOP STACK BACK ON STUMP IN BOP DECK
SIMOPS:
-GENERAL RIG DOWN AROUND THE RIG
03:30 - 05:30 2.00 WHSUR P 15,157.00
RUNCMP NIPPLE UP 11"X4" TUBING HEADADAPTER
AND DOUBLE MASTER 4" DRY HOLE TREE
SIMOPS:
- CHANGE UPPER RAMS FROM 2-7/8" x 5" TO
-
4-1/2"x 7" VBRS FOR NEXT WELL
GENERAL RIG DOWN OPERATIONS
05:30 - 11:30 6.00 WHSUR P 15,15200
RUNCMP PRESSURE TEST ADAPTER AND TREE
- CAMERON REPRESENTATIVE TEST TUBING
HEAD ADAPTER (TUBING PACK -OFF) TO 4500
PSI FOR 15 MIN. TEST APPROVED BY WSUP.
SEE ATTACHED CHART.
- 5 HOURS TO TEST VOID DUE TO THERMAL
EFFECTS, LONG STABILIZATION PERIOD,
INCREASING PRESSURE TRENDS,
SUSPECTEDAIR IN LINES, NIPPLE DOWN/UP
OF TREE TO CONFIRM NO SEAL LEAKAGE,
ETC.
- RIG TEST DRYHOLE TREE AGAINST TWC
WITH DIESEL TO 4500 PSI FOR 5 MIN
(LEAKTIGHT CRITERIA PASS). EVACUATE
TREE FLUIDS AND POUR TWO BOTTLES OF
HEAT INTO TREE TO PREVENT FREEZING.
SIMOPS: GENERAL RIG DOWN OPERATIONS
THROUGHOUT RIG
- RIG DOWN RIG FLOOR, MUD MODULE AND
PIPE SHED
- PREPARE TO SKID RIG FLOOR
-SECURE TOP DRIVEAND BRIDLE UP
4:44:17PM *All depths reported in Drillers Depths'
North America - ALASKA- BP
Operation Summary Report
Page 10 of 10
Common Well Name: 11-23
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 5/16/2018
End Date: 5/20/2018
X3 -018Y4 -C: (2,588,604.00 )
Proleec[ PBU
Site: 11
Rig Name/No.: PARKER 272
Spud Date/Time: 7/11/1986 12:00,00AM
Rig Release: 5/20/2018
Rig Contractor: PARKER DRILLING CO.
BPUOI: USA00001229
Active datum: 11-23B Actual @74.60usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth Phase
Descnpbon of Operations
(hr).
(usft)
_
.11:30 - 12:00 0.50
WHSUR P
15,157.00 RUNCMP
CLEAN CELLAR AND SECURE WELL
- INSTALL ANNULUS AND TREE EQUIPMENT,
FINAL T/I/O = 0/0/0 PSI
-CLOSEALLVALVES ON TREEAND
'WELLHEAD TO PRESSURE GAUGES
- LEAVE WELL HANDOVER CERTIFICATE
OPEN FOR POST RIG WELLS GROUP WORK
HANDOVER WELL FOLDER TO WELL
INTEGRITY.
- CLEANUP LOCATION
- PULL DUMMY WELLHOUSE WITH LOADER
SIMOPS: GENERAL RIG DOWN OPERATIONS
THROUGHOUT THE RIG
END CON EVENTAND RELEASE PARKER RIG
272 AT 12:00
PERFORMANCE SUMMARY:
- NO HSE INCIDENTS
'- 26.5 DAYS, 5 DAYS BEHIND 21.5 DAY
TARGET, 0.9 DAYS BEHIND 25.6 DAYAFE
--$8.75MM,$1.325MM BEHIND$7.425MM
TARGET. $75K BEHIND $8.675MM AFE
25%,159 HOURS, 6.6 DAYS OF TOTAL NPT
(WELUPAD PREP DELAYS, EXTRA RUN FOR
EZSV, DROPPED WHIPSTOCK, UNPLANNED
PROD HOLE SIDETRACK)
Printed 6!//2018 4:44:17PM 'All depths reported in Drillers Depths`
0 by
North America - ALASKA - BP
PBU
11
11-23
11-23BPB1
50029216070
Design: 11-23BPB1
Final Survey Report
17 May, 2018
BA ER
F UGHES
a GE company
BP BAKER
by Final Survey Report JUGHES
E.m,,,
Company:
North America - ALASKA - BP
Project:
PBU
Site:
11
Well:
11-23
Wellbore:
11-23B
Design:
11-23B
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 11-23
11-23B Actual @ 74.60usft (P272 Actual)
11-23B Actual @ 74.60usft (P272 Actual)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point
Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor
Site
11, TR -11-15
(nT)
Site Position:
BGGM2017 5/1/2018
Northing:
5,949,527.780 usft
Latitude:
From:
Map
Easting:
707,585.650 usft
Longitude:
Position Uncertainty:
0.00 usft
Slot Radius:
0.000 in
Grid Convergence:
Welt
11-23
ACTUAL
Tie On Depth:
11,281.92
Well Position
-N/-S 0.00 usft
Northing:
5,952,810.850 usft
Latitude:
+E/ -W 0.00 usft
Easting:
707155.970 usft
Longitude:
Position Uncertainty
0.00 usft
Wellhead Elevation:
28.45 usft
Ground Level:
Wellbore 11-23B
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
70° 15'55.850 N
148° 19' 17,134 W
1.58 °
701 16'28.245 N
148° 19' 27.005 W
27.90 usft
(nT)
BGGM2017 5/1/2018
1746
8098 57,473
Design
11-23B
Audit Notes:
Version: 1.0
Phase:
ACTUAL
Tie On Depth:
11,281.92
Vertical Section:
Depth From (TVD)
.NI -S
-E/.W
Direction
(usft)
(usft)
(usft)
(1)
46 15
0.00
000
337 63
51172018 3:54:26PM
Page 2
COMPASS 5000.1 Build 81D
b BP BAER
p Final Survey Report F�gll E
Company:
North America - ALASKA - BP
Project:
PBU
Site:
11
Well:
11-23
Wellbore:
11-23B
Design:
11-238
Survey Program
From
(usft)
11760
598.60
6,443.00
11,287.00
Survey
MD
(usft)
46.15
117.60
126.60
20"
217.60
317.60
417.60
598.60
719.60
810.60
902.60
961.60
1,142.60
1,263.60
1,357.60
1,452.60
1,546.60
1,641 60
1,73480
1,829,60
Date 5/17/2018
162.20
To
(usft) Survey (Wellbore)
Tool Name
598.60 Sperry Boss Gyro MS WRP 57.0' Copy (11
BOSS -GYRO
6,11460 MWD (11-23)
MWD
11,281.92 BHGE OTK MWD IIFR_MSA 81/2" (11-23
MWD+IFR+MS-WOCA
15,121.75 BHGE OTK MWD IIFR_MSA 6-1/8"(11-2
MWD+IFR+MS-WOCA
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Description
Sperry -Sun BOSS gyro multishot
MWD - Standard
MWD + IFR + Multi Station W/O Crustal
MWD + IFR + Multi Station W/O Crustal
Well 11-23
11-23B Actual @ 74.60usft (P272 Actual)
11-23B Actual @ 74.60usft (P272 Actual)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Inc Azi (uimuth) TVD TVDSS HIS PJW Northing Easting DLeg V. Sec
(usft) (usft) (usft) (usft) (usft) (usft) ('1100usft) (usft)
0.00 0.00 46.15 -28.45 0.00 0.00 5,952,810.850 707,155.970 0.00 0.00
1.10 162.50 117.60 43.00 -0.65 0.21 5,952,810.202 707,156.194 1.54 -0.68
1.08 162.48 126.59 51.99 -0.82 0.26 5,952,810.040 707,158.250 0.20 -0.85
0.90
162.20
217.58
142.98
-2.32
0.73
5,952,808.554
707,158.768
0.20
-242
0.90
163.70
317.57
242.97
-3.82
1.20
5,952 807 066
707,157.270
0.02
-3.99
1.10
172.00
417.55
342.95
-5.52
1.55
5,952,805.372
707,157.871
0.25
-5.70
3.80
285.80
598.42
523.82
-5.61
-3.98
5,952,805.132
707,152.144
2.41
-367
8.30
290.80
718.72
644.12
-142
-16.01
5,952,808.994
707,140.005
3.74
4.78
10.80
290.10
808.45
733.85
3.85
-30.16
5,952,813.866
707,125.717
2.75
15.04
11.10
296.40
898.78
824.18
10.75
-46.19
5,952,820.322
707,109.506
1.34
27.52
10.50
298.10
956.74
882.14
15.81
.56.02
5,952,825.107
707,099.542
1.15
35.94
10.30
314,00
1,134.80
1,060.20
34.82
-82.21
5,952,843.390
707,072.836
1.58
63.49
14.40
328.70
1,253.00
1,178.40
55.20
-97.82
5,952,863.336
707,056.673
4.24
88.28
16.70
342.80
1,343.59
1,268.99
78.10
-107.89
5,952,885.949
707,045.976
4.69
113.29
20.00
342.10
1,433.74
1,359.14
106.61
-116,92
5,952,914.195
707,036.163
3.48
143.09
22.60
342.10
1,521.32
1,446.72
139.10
-127.42
5,952,946.382
707,024.779
2.77
177.12
26.50
342.40
1,607.71
1,533.11
176.69
-139.44
5,952,983.622
707,011.725
4.11
216.46
29.30
343.80
1,689.89
1,615.29
218.33
-152.07
5,953,024.895
706,997.959
3.09
259.77
32.30
344.50
1,771.49
1,696.89
265.12
-165.34
5,953,071.302
706,983.406
3.18
308.09
5/172018 3:54:26PM Page 3 COMPASS 5000.1 Build 81D
by Final SBP y Report BAKER
E�pa°y
Company: North America -ALASKA - BP
Local Coordinate
Reference:
Well 11-23
Project: PBU
TVD Reference:
11-238 Actual @ 74.60usft
(P272 Actual)
Site: 11
MD Reference:
11-23B Actual @ 74.60usft
(P272 Actual)
Well: 1143
North Reference:
True
Wellbore: 11-23B
Survey Calculation
Method:
Minimum Curvature
Design: 11-23B
Database:
EDM R5K -
Alaska PROD - ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easgng
DLeg
V. Sec
(usft) (I
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
1,922.60
34.80
343.10
1,848.99
1,774.39
314.46
-179.69
5,953,120.230
706,967.696
2.81
359.19
1,984.60
36.70
340.30
1,899.31
1,824.71
348.84
-191.08
5,953,154.277
706,955.365
4.04
395.31
2,182.60
34.60
342.10
2,060.20
1,985.60
458.05
-228.31
5,953,262.418
706,915.146
1.19
510.47
2,276.60
36.50
343.80
2,136.67
2,062.07
510.30
-244.32
5,953,314.204
706,897.710
2.28
564.88
2,465.60
38.80
353.70
2,286.44
2,211.84
523.25
-266.52
5,953,426.499
706,872.407
3.42
677.79
ail 2,557.60
42.80
355.80
2,356.08
2,281.48
683.10
-271.98
5,953,486.171
706,865.307
4.60
735.21
2,652.60
46.10
356.50
2,423.88
2,349.28
749.47
-276.43
5,953,552.387
706,859.027
3.51
798.27
2,748.60
4640
357.60
2,490.27
2,415.67
818.72
-280.00
5,953,621.512
706,853.555
0.88
863.67
2,753.60
46.41
357.50
2,493.72
2,419.12
822.34
-280.15
5,953,625.124
706,853.301
1.47
867.06
13 3/8"
3,118.60
47.10
350.20
2,743.97
2,669.37
1,086.32
-308.70
5,953,888.205
706,817.502
1.47
1,122.05
3,554.60
50.20
348.10
3,032.00
2,95740
1,407.67
-370.43
5,954,207.716
706,746.946
0.80
1,442.72
3,803.60
51.90
._ 344.50
_.,3,188.56
3,113.96
1,595.73
-416.35
5,954,394428
706,695.870
1.32
1,634.10
3,927.60
50.10
340.70
3,266.61
3,192.01
1,687.86
-445.12
5,954,485531
706,664.584
2.79
1,730.06
4,116.60
51.90
341.70
3,385.55
3,310.95
1,826.70
192.43
5,954,623210
706,613.460
1.04
1,876.65
4,33680
50.00
-- 337.50
---
-3,524.18
3,449.58
1,986.80
-551.88
5,954,781.598
706,549.630
1.72
2,04232 ,
4,525.60
49.00
337.90
3,646.92
3,572.32
2,119.76
-606.42
5,954,913.004
706,491.457
0.55
2,191.03
4,928.60
45.80
340.30
3,919.69
3,845.09
2,396.76
-712.37
5,955,186.965
706,377.931
0.91
2,487.51
5,242.60
45.10
340.00
4,139.97
4,065.37
2,607.23
-788.34
5,955,395.256
706,296.191
0.23
2,711.06
5,554.60
48.10
338.90
4,354.32
4,279.72
2,819.45
-867.96
5,955,605.189
706,210.770
1.00
2,937.60
5,867.60
50.80
337.90
4,557.79
4,483.19
3,040.53
-955.54
5,955,823.770
706,117.142
0.90
3,175.38
6,114.60
53.50
336.80
4,709.34
4,634.74
3,220.49
-1,030.67
5,956,001.584
706,037.089
1.15
3,370.39
6443.00
54.73
335.19
4,901.84
4,827.24
3,463.52
-1,138.93
5,956,241.525
705,922.186
0.55
3,636.33
9 5/8" Surface Casing
6,473.36
51.18
333.90
4,920.12
4,845.52
3,485.40
-1,149.33
5,956,263.107
705,911.181
12.17
3,660.53
6,563.51
46.84
332.90
4,979.24
4,904.64
3,546.23
-1,179.78
5,956,323.081
705,879.076
4.89
3,728.37
6,628.49
45.69
330.10
5,024.17
4,949.57
3,587.49
-1,202.17
5,956,363.704
705,855.561
3.58
3,775.05
5/17/2018 3:54:26PM
Page 4
COMPASS 5000.1 Build 81D
BP BAKER
by Final Survey Report gUGHES
timmpany
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 11-23
Project:
PBU
TVD Reference:
11-238 Actual @ 74.60usft (P272 Actual)
Site:
11
MD Reference:
11-23B Actual @ 74.60usft (P272 Actual)
Well:
11-23
North Reference:
True
Wellbore:
11-23B
Survey Calculation Method:
Minimum Curvature
Design:
11-23B
Database:
EDM RSK - Alaska PROD - ANCPi
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
0
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
6,659.08
45.05
329.63
5,045.66
4,971.06
3,606.32
-1,213.10
5,956,382.223
705,844.119
2.36
3,796.62
6,689.13
44.35
328.34
5,067.02
4,992.42
3,624.43
-1,223.98
5,956,400.030
705,832.735
3.81
3,817.51
6,722.51
44.11
328.95
5,090.94
5,016.34
3,644.32
-1,236.10
5,956,419.571
705,820.077
1.46
3,840.51
6,753.02
44.06
328.58
5,112.85
5,038.25
3,662.47
-1,247.11
5,956,437.410
705,808.576
0.86
3,861 AS
6,849.82
42.78
327.11
5,183.16
5,108.56
3,718.80
-1,282.51
5,956,492.741
705,771.641
1.68
3,927.05.
6,944.21
40.30
326.77
5,253.81
5,179.21
3,771.26
-1,316.65
5,956,544.237
705,736.072
2.64
3,988.55'
7,038.19
38.12
325.68
5,326.62
5,252.02
3,820.64
-1,349.66
5,956,592.694
705,701.712
2.43
4,046.78
7,133.44
36.08
325.80
5,402.59
5,327.99
3,868.13
-1,382.00
5,956,639.266
705,668.075
2.14
4,103.00
7,228.94
34.94
325.68
5,480.33
5405.73
3,913.97
-1,413.23
5,956,684.233
705,635.600
1.20
4,157.28
7,323.37
34.79
324.80
5,557.81
5,483.21
3,958.32
-1,444.01
5,956,727.713
705,603.618
0.56
4,210.01
7,419.47
34.02
324.90
5,637.09
5,562.49
4,002.72
-1,475.27
5,956,771.231
705,571.147
0.80
4,262.96
7,514.17
33.98
324.26
5,715,60
5,641.00
4,045.87
-1,505.96
5,956,813.522
705,539.281
0.38
4,314.55
7,608.84
34.02
324.48
5,794.09
5,719.49
4,088.90
-1,536.80
5,956,855.683
705507.271
0.14
4,366.07
7,703.70
33.94
32344
5,872.75
5,798.15
4,131.77
-1,567.99
5,956,897.675
705,474.913
0.62
4,417.59
7,799.09
34.02
321.82
5,951.85
5,877.25
4,174.13
-1,600.35
5,956,939.133
705,441.403
0.95
4,469.08
7,893.46
33.98
320.14
6,030.09
5,955.49
4,215.13
-1,633.57
5,956,979.196
705,407.068
1.00
4,519.64
7,988.58
34.02
319.90
6,108.95
6,034.35
4,255.89
-1,667.74
5,957,018.996
705,371.784
0.15
4,570.33
8,083.25
33.37
319.37
6,187.72
6,113.12
4,295.91
-1,701.76
5,957,058.060
705,336.684
0.75
4,620.28
8,177.74
33.37
318.79
6,266.63
6,192.03
4,335.18
-1,735.80
5,957,096.378
705,301.575
0.34
4,669.56
8,272.50
33.26
318.92
6,345.81
6,271.21
4,374.37
-1,770.04
5,957,134.612
705,266.266
0.14
4,718.83
8,367.58
33.24
320.82
6,425.33
6,350.73
4,414.23
-1,803.64
5,957,173.524
705,231.587
1.10
4,768.48
8,462.45
33.21
321.98
6,504.69
6,430.09
4,454.85
-1,836.07
5,957,213.237
705,198.053
0.67
4,818.38
8,558.11
33.31
321.84
6,584.68
6,510.08
4,496.14
-1,868.43
5,957,253.620
705,164.566
0.13
4,868.89
8,652.23
33.25
320.95
6,663.37
6,588.77
4,536.50
-1,900.66
5,957,293.075
705,131.245
0.52
4,918.47
8,748.19
33.25
321.16
6,743.62
6,669.02
4,577.42
-1,933.73
5,957,333.067
705,097.061
0.12
4,968.90
8,842.79
33.19
321.65
6,822.76
6,748.16
4,617.93
-1,966.06
5,957,372.666
705,063.629
0.29
5,018.66
8,938.17
33.10
322.84
6,902.62
6,828.02
4,659.18
-1,997.95
5,957,413.027
705,030.614
0.75
5,068.95
5/172018 3: 54 26P Page 5 COMPASS 5000.1 Build 81D
•a
Company:
North America -ALASKA -8P
Project:
PBU
Site:
11
Well:
11-23
Wellbore:
11-23B
Design:
11-23B
Survey
MD Inc
(usft) ( )
9,033.11
9,128.44
9,223.38
9,318.09
9,413.02
9,508.00
9,602.91
9,697.62
9,794.09
9,888.54
9,983.23
10,078.63
10,172.22
10,268.24
10,362.71
10,458.32
10,552.49
10,584.44
10,615.00
DRILLING LINER 1
10,652.84
10,683.66
10,715.03
10,746.91
10,777.57
10,810.08
10,841.35
BP
Final Survey Report �F�VGH
GEmmpany
Local Co-ordinate Reference:
Well 11-23
TVD Reference:
11-23B Actual @ 74.60usft (P272 Actual)
MD Reference:
11-23B Actual Q 74.60usft (P272 Actual)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
32.12
Azi (azimuth)
TVD
TVDSS
NIS
E1W
5,958,144.925
Northing
Easgng
DLeg
V. sec
33.32
330.20
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
3.91
(1100usit)
(usft)
329.38
33.28
322.10
6,982.07
6,907.47
4,700.43
-2,029.58
704,449.160
5,957,453.380
704,997.868
6,000.57
0.52
5,119.13
8,423.57
33.33
322.05
7,061.74
6,987.14
4,741.72
-2,061.75
5,957,493.768
704,964.572
39.31
0.06
5,169.55
8,373.04
33.38
322.17
7,141.05
7,066.45
4,782.91
-2,093.81
7.52
5,957,534.064
704,931.393
327.05
0.09
5,219.85
5,485.96
33.25
322.37
7,220.19
7,145.59
4,824.05
-2,125.64
6,058.60
5,957,574.311
704,898.442
8,495.53
0.18
5,270.01
-2,601.07
33.40
321.00
7,299.51
7,224.91
4,864.97
-2,157.97
5,957,614.321
704,664.996
0.81
5,320.16
33.14
320.43
7,378.93
7,304.33
4,905.30
-2,190.97
5,957,653.725
704,830.909
0.43
5,370.01
33.29
320.08
7,458.33
7,383.73
4,945.27
-2,224.21
5,957,692.767
704,796.582
0.26
5,419.62
33.31
320.53
7,537.49
7,462.89
4,985.28
-2,257.42
5,957,731.845
704,762.284
0.26
5,469.26
33.32
321.68
7,618.11
7,543.51
5,026.52
-2,290.69
5,957,772.148
704,727.895
0.65
5,520.06
32.46
323.59
7,697.42
7,622.82
5,067.27
-2,321.82
5,957,812.027
704,695.656
1.43
5,569.59
32.79
324.85
7,777.17
7,702.57
5,108.64
-2,351.73
5,957,852.549
704,664.612
0.70
5,619.23
33.23
324.56
7,857.17
7,782.57
5,151.00
-2,381.84
5,957,894.069
704,633.356
0.46
5,669.86
33.30
324.29
7,935.42
7,660.82
5,192.76
-2,411.70
5,957,934.982
704,602.354
0.18
5,719.84
32.22
326.89
8,016.17
7,941.57
5,235.61
-2,441.07
5,957,977.002
704,571.817
1.85
5,770.64
30.50
329.75
8,096.84
8,022.24
5,277.42
-2,466.91
5,958,018.083
704,544.840
2.41
5,819.14
30.74
329.96
8,179.12
8,104.52
5,319.53
-2,491.37
5,958,059.504
704,519.236
0.27
5,867.39
30.64
330.46
8,260.10
8,185.50
5,361.24
-2,515.24
5,958,100.540
704,494.218
0.29
5,915.05
30.77
330.24
8,287.57
8,212.97
5,375.42
-2,523.32
5,958,114.490
704,485.761
0.54
5,931.23
31.37
330.13
8,313.75
8,239.15
5,389.10
-2,531.16
5,958,127.953
704,477.546
1.98
5,946.87
32.12
330.00
8,345.93
8,271.33
5,406.36
-2,541.09
5,958,144.925
704,467.139
1.98
5,966.61
33.32
330.20
8,371.86
8,297.26
5,420.80
-2,549.40
5,958,159.132
704,458.441
3.91
5,983.12
35.01
329.38
8,397.81
8,323.21
5,436.02
-2,558.26
5,958,174.103
704,449.160
5.58
6,000.57
37.20
328.81
8,423.57
8,348.97
5,452.14
-2,567.91
5,958,189.947
704,439.071
6.95
6,019.15
39.31
327.31
8,447.64
8,373.04
5,468.24
-2,577.96
5,958,205.766
704,428.585
7.52
6,037.87
41.55
327.05
8,472.39
8,397.79
5,485.96
-2,589.39
5,958,223.162
704,416.675
6.91
6,058.60
42.99
325.49
8,495.53
8,420.93
5,50344
-2,601.07
5,958,240.322
704,404.517
5.70
6,079.22
5/17/2018 3:54:26PM Page 6 COMPASS 5000.1 Build 810
BP
by Final Survey Report �F�UGHES
�r P v
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well 11-23
Project: PBU
TVD Reference:
11-23BActual @ 74.60usft
(P272 Actual)
Site: 11
MD Reference:
11-23BActual Q 74.60usK
(P272 Actual)
Well: 11-23
North Reference:
True
Wellbore: 11-23B
Survey Calculation Method:
Minimum Curvature
Design: 11-23B
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
FEW
Northing
Easting
DLeg
V. Sec
(usR) (°(
(°)
(usft)
(waft)
(usft)
(usft)
(usft)
(usR)
(°/100usft)
(usf)
10,871.84
44.76
324.92
8,517.51
8,442.91
5,520.80
-2,613.13
5,958,257.334
704,391.985
5.95
6,099.85
10,904.47
47.43
324.44
8,540.13
8,465.53
5,539.98
-2,626.72
5,958,276.131
704,377.870
8.25
6,122.76
10,936.44
49.91
324.41
8,561.24
8,486.64
5,559.50
-2,640.69
5,958,295.262
704,363.373
7.76
6,146.13
10,966.97
51.66
324.24
8,580.54
8,505.94
5,578.71
-2,654.48
5,958,314.089
704,349.056
5.75
6,169.15
10,999.17
53.76
324.58
8,600.05
8,525.45
5,599.55
-2,669.39
5,958,334.501
704,333.581
6.58
6,194.09
11,030.99
55.57
324.65
8,618.45
8,543.85
5,620.71
-2,684.42
5,958,355.240
704,317.974
5.69
6,219.38
11,061.37
56.89
323.53
8,635.34
8,560.74
5,641.16
-2,699.23
5,958,375.276
704,302.605
5.32
6,243.93
11,096.50
59.02
324.67
8,653.98
8,579.38
5,665.28
-2,716.69
5,958,398.906
704,284.492
6.66
6,272.88
11,124.50
61.18
326.63
8,667.94
8,593.34
5,685.32
-2,730.38
5,958,418.560
704,270.256
9.81
6,296.82
11,155.83
63.26
328.86
8,682.54
8,807.94
5,708.76
-2,745.16
5,958,441.584
704,254.830
9.15
6,323.92
11,187.48
65.78
331.06
8,696.16
8,621.56
5,733.49
-2,759.46
5,958,465.912
704,239.860
10.14
6,352,24
11,218.82
67.92
332.13
8,708.48
8,633.88
5,758.84
-2,773.17
5,958,490.870
704,225.463
7.52
6,380.89
11,250.18
69.58
331.75
8,719.84
8,645.24
5,784.63
-2,786.91
5,958,516.272
704,211.010
5.41
6,409.97
11,281.92
71.95
331.83
8,730.30
8,655.70
5,811.04
-2,801.08
5,958,542.277
704,196.124
7.47
6,439.78
11.23B TIP
11,287.00
72.36
331.85
8,731.85
8,657.25
5,815.30
-2,803.36
5,958,546.476
704,193.726
8.48
6,444.59
11-23B KOP-OHST
11,312.95
70.65
332.09
8,740.08
8,665.48
5,837.03
-2,814.92
5,958,567.873
704,181.570
6.72
6,469.06
11,344.17
72.27
330.72
8,750.01
8,675.41
5,863.01
-2,829.09
5,958,593.459
704,166.893
6.65
6,498.51
11,376.08
74.32
328.14
8,759.18
8,684.58
5,889.32
-2,844.64
5,958,619.329
704,150.430
10.06
6,528.75
11,408.59
77.18
325.81
8,767.18
8,692.58
5,915.73
-2,861.81
5,958,645.256
704,132.537
11.21
6,559.71
11,438.23
80.45
324.81
8,772.93
8,698.33
5,939.64
-2,878.36
5,958,668.695
704,115.339
11.52
6,588.12
11,470.02
85.13
324.41
8,776.92
8,702.32
5,965.34
-2,896.62
5,958,693.885
704,096.378
14.77
6,618.84
11,501.62
90.45
323.73
8,778.14
8,703.54
5,990.90
-2,915.14
5,958,718.923
704,077.160
16.97
6,649.52
11,533.03
91.18
324.36
8,777.69
8,703.09
6,016.32
-2,933.58
5,958,743.827
704,058.028
3.07
6,680.05
11,627.46
92.07
327.38
8,775.02
8,700.42
6,094.45
-2,986.54
5,958,820.460
704,002.946
3.33
6,772.45
11,721.25
90.62
326.94
8,772.81
8,698.21
6,174.10
-3,036.00
5,958,898.715
703,951.312
2.27
6,864.93
5/17@018 3:54:26PM
Page 7
COMPASS
5000.1 Build 81D
ntibP Final SBP urvey Report �JUGHES
GE[Omp3ny
Company: North America - ALASKA - BP
Local Co-ordinate
Reference:
Well 11-23
Project: PBU
ND Reference:
11-238 Actual a 74.60usft
(P272 Actual)
Site: 11
MD Reference:
11-23B Actual @ 74.60usft
(P272 Actual)
Well: 11-23
North Reference:
True
Wellbore: 11-23B
Survey Calculation
Method:
Minimum Curvature
Design: 11-23B
Database:
EDM R5K - Alaska PROD - ANCPt
Survey
MD Inc
An (azimuth)
TVD
TVDSS
NIS
E/W
Nordling
Easting
DLeg
V. Sec
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(waft)
(usft)
(°1100usft)
(usft)
11,816.18
90.54
329.54
6,771.85
8,697.25
6,255.67
-3084.55
5,958,978.913
703,900.539
0.64
6,958.84
11,910.90
90.54
329.87
8,770.96
8,696.36
6,337.45
-3,132.33
5,959,059.344
703,850.529
0.35
7,052.65
12,003.35
91.28
330.60
8,769.49
8,694.89
6,417.69
-3,178.22
5,959,130,288
703,802.450
1.12
7,144.32
12,099.07
91.27
332.88
8,767.36
8,692.76
6,501.98
-3,223.52
5,959,221.289
703,754.842
2.38
7,239.50
12,192.33
91.52
332.16
8,765.09
8,690.49
6,584.69
-3,266.54
5,959,302.782
703,709.563
0.82
7,332.36
12,286.92
92.17
329.64
8,762.05
8,687.45
6,667.29
-3,312.52
5,959,384.081
703,661.335
2.75
7,426.24
12,380.99
92.97
331.32
8,757.83
8,683.23
6,749.06
-3,358.82
5,959,464.543
703,612.801
1.98
7,51948
12,475.85
92.75
329.21
8,753.09
8,678.49
6,831.32
-3,405.81
5,959,545.476
703,563.568
2.23
7,613.44
12,570.52
92.66
330.57
8,748.63
8,674.03
6,913.13
-3,453.25
5,959,625.938
703,513.898
1.44
7,707.14
12,665.46
92.59
329.92
8,744.28
8,669.68
6,995.46
-3,500.31
5,959,706.942
703,464.584
0.69
7,801.19
12,698.08
92.37
330.28
8,742.87
8,668.27
7,023.71
-3,516.56
5,959,734.735
703,447.567
1.29
7,833.50
12,729.91
92.19
331.97
8,741.60
8,667.00
7,051.56
-3,531.92
5,959,762.149
703,431.449
5.34
7,865.10
12,759.74
92.19
334.92
8,740.46
8,665.86
7,07822
-3,54524
5,959,788.432
703,417.397
9.88
7,894.83
12,794.47
91.82
338.41
8,739.24
8,66464
7,110.09
-3,558.99
5,959,819.904
703,402.779
10.10
7,929.52
12,825.84
91.79
339.59
8,738.26
8,663.66
7,139.36
-3,570.22
5,959,848.854
703,390.742
3.76
7,960.87
12,855.64
91.83
339.54
8,737.31
8,662.71
7,167.27
-3,580.82
5,959,876466
703,379.579
0.21
7,990.64
12,949.26
91.89
337.45
8,734.28
8,659.68
7,254.32
-3,614.92
5,959,962.537
703,342.898
2.23
8,084.19
13,043.57
91.89
339.58
8,731.16
8,656.56
7,342.03
-3,649.44
5,960,049.253
703,305.977
2.26
8,17843
13,138.30
91.76
337.44
8,728.15
8,653.55
7,430.12
-3,684.13
5,960,136.354
703,268.883
2.26
6,273.10
13,234.05
91.70
333.21
8,725.26
8,650.66
7,517.07
-3,724.07
5,960,222.165
703,226.561
4.42
8,368.71
13,327.54
92.38
335.87
8,721.93
8,647.33
7,601.42
-3,76423
5,960,305.372
703,184.096
2.93
8,461.99
13,422.45
91.85
339.10
8,718.42
8,643.82
7,689.02
-3,800.55
5,960,391.939
703,145.387
3.45
8,556.82
13,517.82
91.83
338.39
8,715.36
8,640.76
7,777.86
-3,835.10
5,960,479.786
703,108.401
0.74
8,652.13
13,612.20
91.77
339.81
8,712.40
8,637.80
7,865.98
-3,868.75
5,960,566.946
703,072.338
1.51
8,746.43
13,707.53
91.80
343.09
8,709.43
8,634.83
7,956.30
-3,899.06
5,960,656.394
703,039.555
3.44
8,841.49
13,738.32
91.79
343.74
8,708.46
8,633.86
7,985.80
-3,907.85
5,960,685.634
703,029.963
2.11
8,872.10
13,770.22
91.89
345.84
8,707.44
8,632.84
8,016.56
-3,916.21
5,960,716.155
703,020.755
6.59
8,903.74
5117/2018 3:54:26PM Page 8 COMPASS 5000.1 Build 81D
BP
y`ty bpFinal Survey Report BATYGHES
E-Pany
Company: North America -ALASKA -BP
Local C"rdlnata Rderanco:
Well 11-23
Project: PBU
TVD Reference:
11-238 Actual @ 74.60usft
(P272 Actual)
Site: 11
MD Ref mance:
11-23B Actual @ 74.60us6
(P272 Actual)
Well: 11-23
North Ref mance:
True
Wellbore: 11-23B
Survey Calculation Method:
Minimum Curvature
Design: 11-23B
Database:
EDM RSK - Alaska
PROD - ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Earning
D1.99
V. Sec
(usft)
(I
V)
lush)
(usft)
(usft)
(usft)
(uaft)
(usft)
(°110cuaft)
(usft)
13,800.67
91.80
348.52
8,705.46
8,631.86
8,046.24
-3,922.96
5,960,745.629
703,013.189
8.80
8,933.7E
13,833.66
91.79
348.61
8,705.42
8,630.82
8,078.56
-3,929.50
5,960,777.755
703,005.765
0.27
8,966.12
13,896.12
92.07
349.61
8,703.32
8,628.72
8,139.86
-3,941.29
5,960,838.703
702,992.289
1.66
9,027.30
13,927.02
93.07
354.02
8,701.93
8,627.33
8,170.40
-3,945.69
5,960,869.116
702,987.056
14.62
9,057.22
13,959.47
91.85
355.75
8,700.54
8,625.94
8,202.69
-3,948.58
5,960,901.311
702,983.278
6.52
9,088.18
13,990.27
91.51
356.17
8,699.64
8,625.04
8,233.40
-3,950.75
5,960,931.949
702,980.265
1.75
9,117.40
14,02246
91.58
356.11
8,698.77
8,624.17
8,265.51
-3,952.91
5,960,963.980
702,977.216
0.29
9,147.91
14,084.67
91.89
355.83
6,696.89
8,622.29
8,327.53
-3,957.28
5,961,025.861
702,971.140
0.67
9,206.94
14,178.82
93.06
356.49
8,692.83
8,618.23
8,421.18
-3,963.57
5,961,119.297
702,962.278
1.43
9,295.93
14,273.65
93.27
352.78
8,687.58
8,612.98
8,515.64
-3,972.44
5,961,213.465
702,950.812
3.90
9,388.65
14,366.91
92.16
352.36
8,683.16
8,608.56
8,608.01
-3,984.49
5,981,305.465
702,938.228
1.27
9,476.66
14,46026
92.10
356.72
8,679.68
8,605.08
8,701.25
-3,993.40
5,961,398.417
702,924.753
4.65
9,566.27
14,556.28
92.01
0.56
'8,676.25
8,601.65
8,796.76
-3,995.67
5,961,493.827
702,919,857
4.01
9,65546
14,650.17
92.07
-
4.54
8,672.90
8,598.30
8,890.48
3,99149
5,961,587.821
702,921.449
4.24
9,740.54
14,744.93
92.10
:6.71
8,669.46
8,594.86
8,984.71
-3,982.21
5,961,682.071
702,928.132
2.29
9,824.15
14,838.49
92.32
-'-
3.10 -"
'8,665.85
8,591.25
9,077.85
-3,974.22
5,961,775.384
702,933.558
3.86
9,907.22
14,933.71
95.13
3.91
8,659.66
8,585.06
9,172.68
-3,968.41
5,961,870.334
702,936.752
3.07
9,99271
14,966.50
97.74
4.70
8,655.99
8,581.39
9,205.17
-3,965.97
5,961,902.875
702,938.302
8.31
10,021.83
14,997.54
98.41
5.15
8,651.83
8,577.03
9,235.78
-3,963.33
5,961,933.553
702,940.096
2.59
10,049.14
15,028.87
100.09
4.72
8,646.59
8,571.99
9,266.59
-3,960.67
5,961,964.420
702,941.907
5.53
10,076.61
15,061.37
101.58
4.84
8,640.48
8,565.88
9,298.40
-3,958.01
5,961,996.288
702,943.690
4.60
10,105.02
15,095.45
103.38
6.36
8,633.12
8,558.52
9,331.51
-3,954.76
5,962,029.477
702,946.022
6.85
10,13440
15,121.75
104.75
6.74
8,626.72
8,552.12
9,356.86
-3,951.85
5,962,054.891
702,948.233
5.39
10,156.73
15,157.00
104.75
6.74
8,617.75
8,543.15
9,390.71
-3,947.85
5,962,088.839
702,951.300
0.00
10,186.51
Projection to TD - 41/2" Production Liner
5/172018 3:54:26PM Page 9 COMPASS 5000.1 Build 81D
BP
bp Final Survey Report
Company:
North America - ALASKA - BP
Project:
PBU
Site:
11
Well:
11-23
Wellbore:
11-23B
Design:
11-23B
15,157.00 8,617.75 4 1/2' Production Liner
Design Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+NI -S
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
11,281.92
8,730.30
5,811.04
-2,801.08
11-23B TIP
11,287.00
8,731.85
5,815.30
-2,803.36
11-23B KOP-OHST
15,157.00
8,617.75
9,390.71
-3,947.85
Projection to TD
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
4.500 4.500
BA ER
F�IGHES
Well 11-23
11-238 Actual @ 74.60usft (P272 Actual)
11-23B Actual @ 74.60usft (P272 Actual)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes a GE Company
&172018 3:54:26PM Page 10 COMPASS 5000.1 Build 81D
by
North America - ALASKA - BP
PBU
11
11-23
11-23BPB1
5002921606.0
Design: 11-23BPB1
Final Survey Report
17 May, 2018
BAF IGHES
BAT
GE company
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27.OGP-Usa AK [4267'15864] Using Well Reference Point
Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1588, Using geodetic scale factor
Site 11, TR -11-15
Site Position:
From: Map
Position Uncertainty: 0.00 usft
Well 11-23
Well Position -NIS 0.00 usft
+EI -W 0.00 usft
Position Uncertainty 0.00 usft
Wellbore 11-23BP81
Magnetics Model Name
BGGM2017
Design 11-23BPB1
Audit Notes:
Version: 1.0
Vertical Section:
Northing:
5,949,527.780 usft
BP
BA4GHES
by
Longitude:
Final Survey Report
0.000 in
Grid Convergence:
Northing:
5,952,810.850 usft
oc�omoanv
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 11-23
Project:
PBU
TVD Reference:
11-238 Actual @ 74.60usft (P272 Actual)
Site:
11
MD Reference:
11-23B Actual @ 74.60usft (P272 Actual)
Well:
11-23
North Reference:
True
Wellbore:
11-238PB1
Survey Calculation Method:
Minimum Curvature
Design:
11-23BPB1
Database:
EDM R5K - Alaska PROD - ANCPI
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27.OGP-Usa AK [4267'15864] Using Well Reference Point
Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1588, Using geodetic scale factor
Site 11, TR -11-15
Site Position:
From: Map
Position Uncertainty: 0.00 usft
Well 11-23
Well Position -NIS 0.00 usft
+EI -W 0.00 usft
Position Uncertainty 0.00 usft
Wellbore 11-23BP81
Magnetics Model Name
BGGM2017
Design 11-23BPB1
Audit Notes:
Version: 1.0
Vertical Section:
Northing:
5,949,527.780 usft
Latitude:
Easting:
707,585.650 usft
Longitude:
Slot Radius:
0.000 in
Grid Convergence:
Northing:
5,952,810.850 usft
Latitude:
Easting:
707,155.970 usft
Longitude:
Wellhead Elevation:
28.45 usft
Ground Level:
Sample Date Declination Dip Angle Field Strength
(1 (1) (nT)
5/1/2018 1746 80.08 57,473
Phase:
ACTUAL
Tie On Depth:
6,114.60
Depth From (TVD)
-NI-S
+El -W
Direction
(usft)
(usft)
(usft)
(1)
4615
0.00
0.00
341.00
701 15'55.850 N
1481 19' 17.134 W
1.58'
701 16'28.245 N
148° 19'27.005 W
27.90 usft
51172018 3:38:48PM Page ^ COMPASS 5000.1 Build 81D
BP
by Final Survey Report BAF�UGHES
rompeiry
Company: North America - ALASKA - BP
Inc
Project: PBU
TVD
Site: 11
TVDSS
Well: 11-23
E/W
Wellbore: 11-23BPB1
Easting
Design: 11-23BPB1
V. Sec
Survey Program Date 5/17/2018
(°)
From To
(usft)
(usft) (usft) Survey (Wellbore)
Tool Nam
117.60 598.60 Sperry Boss Gyro MS WRP 57.0' Copy (11
BOSS -GYRO
598.60 6,114.60 MWD (11-23)
MWD
6,443.00 13,705.46 BHGE OTK MWD IIFR_MSA 81/2" (11-23
MWD+IFR+MS-WOCA
Survey
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Description
Sperry -Sun BOSS gyro multishot
MWD - Standard
MWD + IFR + Multi Station W10 Crustal
Well 11-23
11-23B Actual @ 74.60usit (P272 Actual)
11-23B Actual @ 74.60usft (P272 Actual)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
MD
Inc
Azi (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°HOOusilt)
(usft)
46.15
0.00
0.00
46.15
-28.45
0.00
0.00
5,952,810.850
707,155.970
0.00
0.00
117.60
1.10
162.50
117.60
43.00
-0.65
0.21
5,952,810.202
707,156.194
1.54
-0.69
126.60
1.08
162.48
126.59
51.99
-0.82
0.26
5,952,810.040
707,156.250
0.20
-0.86
20"
217.60
0.90
162.20
217.58
142.98
-2.32
0.73
5,952,808.554
707,156.768
0.20
-2.43
317.60
0.90
163.70
317.57
242.97
-3.82
1.20
5,952,807.066
707,157.270
0.02
-4.00
417.60
1.10
- 172.00
- .. 417.55
342.95
-5.52
1.55
5,952,805.372
707,157.671
0.25
-5.73
598.60
3.80
285.80
_ 59842
523.82
-5.61
-3.98
5,952,805.132
707,152.144
2.41
-4.01
719.60
8.30
280.80
718.72
644.12
-1.42
-16.01
5,952,808.994
707,140.005
3.74
3.87
810.60
10.80
-- 290.10 -
808.45
733.85
3.85
-30.16
5,952,813.866
707,125.717
2.75
13.46
902.60
11.10
296.40
898.78
824.18
10.75
-46.19
5,952,820.322
707,109.506
1.34
25.20
961.60
10.50
298.10
956.74
882.14
15.81
-56.02
5,952,825.107
707,099.542
1.15
33.18
1,142.60
10.30
314.00
1,134.80
1,060.20
34.82
-82.21
5,952,843.390
707,072.836
1.58
59.68
1,263.60
14.40
328.70
1,253.00
1,178.40
55.20
-97.82
5,952,863.336
707,056.673
4.24
84.04
1,357.60
16.70
342.80
1,343.59
1,268.99
78.10
-107.89
5,952,885.949
707,045.976
4.69
108.97
1,452.60
20.00
342.10
1,433.74
1,359.14
106.61
-116.92
5,952,914.195
707,036.163
3.48
138.86
1,546.60
22.60
342.10
1,521.32
1,446.72
139.10
-127.42
5,952,946.382
707,024.779
2.77
173.00
1,641.60
26.50
342.40
1,607.71
1,533.11
176.69
-139.44
5,952,983.622
707,011.725
4.11
212.45
1,734.60
29.30
343.80
1,689.89
1,615.29
218.33
-152.07
5,953,024.895
706,997.959
3.09
255.93
1,829.60
32.30
344.50
1,771.49
1,696.89
265.12
-165.34
5,953,071.302
706,983.406
3.18
304.50
1,922.60
34.80
343.10
1,848.99
1,774.39
314.46
-179.69
5,953,120.230
706,967.696
2.81
355.83
511712018 3:38:48PM Page 3 COMPASS 5000.1 Build 81D
Company:
North America - ALASKA - BP
Project
PBU
Site:
11
Well:
11-23
Wellbore:
11-23BPB7
Design:
11-23BPB7
Survey
MD Inc
Well 11-23
(usft) 1°1
11-238 Actual @ 74.60usft (P272 Actual)
1,984.60
36.70
2,182.60
34.60
2,276.60
36.50
2,465.60
38.80
2,557.60
42.80
2,652.60
46.10
2,748.60
46.40
2,753.60
46.41
13 3l8"
(usft)
3,118.60
47.10
3,554.60
50.20
3,803.60
51.90
3,927.60
50.10
4,116.60
51.90
4,336.60
50.00
4,525.60
49.00
4,928.60
45.80
5,242.60
45.10
5,554.60
48.10
5,867.60
50.80
6,114.60
53.50
11-23BPB1 TIP
510.30
6,443.00
54.73
KOP-TOWS - 9 518" Surface Casing
6,473.36
51.18
BOWS
562.03
6,563.51
46.84
Interpolated Azimuth
623.25
BP MI ER
Final Survey Report Vq, Eq
crmmpa�v
Local Coordinate Reference:
Well 11-23
TVD Reference:
11-238 Actual @ 74.60usft (P272 Actual)
MD Reference:
11-238 Actual @ 74.60usft (P272 Actual)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
AN (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easfing
DLeg
V. Sec
(°)
(usft)
(usft)
(waft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
340.30
1899.31
1,824.71
348.84
-191.08
5,953,154.277
706,955.365
4.04
392.04
342.10
2,060.20
1,985.60
458.05
-228.31
5,953,262.418
706,915.146
1.19
507.42
343.80
2,136.67
2,062.07
510.30
-244.32
5,953,314.204
706,897.710
2.28
562.03
353.70
2,288.44
2,211.84
623.25
-266.52
5,953,426.499
706,872.407
3.42
676.07
355.80
2,356.08
2,281.48
683.10
-271.98
5,953,486.171
706,865.307
4.60
734.43
356.50
2,423.88
2,349.28
749.47
-276.43
5,953,552.387
706,859.027
3.51
798.63
357.60
2,490.27
2,415.67
818.72
-280.00
5,953,621.512
706,853.555
0.88
865.28
357.50
2,493.72
2,419.12
822.34
-280.15
5,953,625.124
706,853.301
1.47
868.75
350.20
2,743.97
2,669.37
1,086.32
-308.70
5,953,888.205
706,817.502
1.47
1,127.64
348.10
3,032.00
2,957.40
1,407.67
-370.43
5,954,207.716
706,746.946
0.80
1,451.59
344.50
3,188.56
3,113.86
1,595.73
-416.35
5,954,394428
706,695.870
1.32
1,644.35
340.70
3,266.61
3,192.01
1,687.66
-445.12
5,954,485.531
706,664.584
2.79
1,740.64
,. 341.70
3,385.55
3,310.95
1,82670
-492.43
5,954,623.210
706,613.460
1.04
1,887.51
397.50
3,524.18
3,449.58
1,986.80
-551.88
5,954,781.598
706,549.630
1.72
2,058.24
337.90
.3,646.92
3,572.32
2,119.76
-606.42
5,954,913.004
706,491.457
0.55
2,201.71
340.30
3,919.69
3,845.09
2,396.76
-712.37
5,955,186.965
706,377.931
0.91
2,498.11
340.00
4,139.97
4,065.37
2,607.23
-788.34
5,955,395.256
706,296.191
0.23
2,721.85
338.90
4,354.32
4,279.72
2,819.45
-867.96
5,955,605.189
706,210.770
1.00
2,948.42
337.90
4,557.79
4,483.19
3,040.53
-955.54
5,955,823.770
706,117.142
0.90
3,185.98
336.80
4,709.34
4,634.74
3,220.49
-1,030.67
5,956,001.584
706,037.089
1.15
3,380.59
335.19
4,901.84
4,827.24
3,463.52
-1,138.93
5,956,241.525
705,922.186
0.55
3,645.62
333.90
4,920.12
4,845.52
3,485.40
-1,149.33
5,956,263.107
705,911.181
12.17
3,669.70
332.90
4,979.24
4,904.64
3,546.23
-1,179.78
5,956,323.081
705,879.076
4.89
3,737.13
5/172018 3.38:48PM Page 4 COMPASS 5000.1 Build 810
BP BA ER
by Final Survey Report FVgME 0
�E�om��v
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 11-23
Project:
PBU
TVO Reference:
11-23B Actual @ 74.60usft (P272 Actual)
Site:
11
MD Reference:
11-23BActual @ 74.60usR (P272 Actual)
Well:
11-23
North Reference:
True
Wellbore
11-23BPB1
Survey Calculation Method:
Minimum Curvature
Design:
11-23BPB1
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD
Inc
Az, (azimuth)
ND
TVDSS
N/S
VW
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
Wait)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
6,628.49
45.69
330.10
5.024.17
4,949.57
3,587.49
-1,202.17
5,956,363.704
705,855.561
3.58
3,783.42
6,659.08
45.05
329.63
5,045.66
4,971.06
3,606.32
-1,213.10
5,956,382.223
705,844.119
2.36
3,804.79
6,689.13
44.35
328.34
5,067.02
4,992.42
3,624.43
-1,223.98
5,956,400.030
705,832.735
3.81
3,825.46
fi 722.51
44.11
328.95
5,090.94
5,016.34
3,644.32
-1,236.10
5,956,419.571
705,820.077
1.46
3,848.21
6,753.02
44.06
328.58
5,112.85
5,038.25
3,662.47
-1,247.11
5,956,437.410
705,808.576
0.86
3,868.95
6,849.82
42.78
327.11
5,183.16
5,108.56
3,718.80
-1,282.51
5,956,492.741
705,771.641
1.68
3,933.74
6,944.21
40.30
326.77
5,253.81
5,179.21
3,771.26
-1,316.65
5,956,544.237
705,736.072
2.64
3,994.45
7,038.19
38.12
325.68
5,326.62
5,252.02
3,820.64
-1,349.66
5,956,592.694
705,701.712
2.43
4,051.89
7,133.44
36.08
325.80
5,402.59
5,327.99
3,868.13
-1,382.00
5,956,639.266
705,668.075
2.14
4,107.32
7,228.94
34.94
325.68
5,480.33
5,405.73
3,913.97
-1,413.23
5,956,684.233
705,635.600
1.20
4,160.83
7,323.37
34.79
324.80
5,557.81
5,483.21
3,958.32
-1,444.01
5,956,727.713
705,603.618
0.56
4,212.78
7,419.47
34.02
324.90
5,637.09
5,56249
4,002.72
-1,475.27
5,956,771.231
705,571.147
0.80
4,264.94
7,514.17
33.98
324.26
5,715.60
5,641.00
4,045.87
-1,505.96
5,956,813.522
705,539.281
0.38
4,315.73
7,608.84
34.02
324.48
5,794,09
5,719.49
4,088.90
-1,536.60
5,956,855.883
705,507.271
0.14
4,366.45
7,703.70
33.94
323.44
5,872.75
5,798.15
4,131.77
•1,567.99
5,956,897.675
705,474.913
0.62
4,417.14
7,799.09
34.02
321.82
5,951.85
5,877.25
4,174.13
-1,600.35
5,956,939-133
705,441.403
0.95
4,467,7-
7,893,46
33.98
320.14
6,030.09
5,955.49
4,215.13
-1,633.57
5,956,979.196
705,407.068
1.00
4,517.31
7,988.58
34.02
319.90
6,108.95
6,034.35
4,255.89
-1,667.74
5,957,018.996
705,371.784
0.15
4,566.97
8,083.25
33.37
319.37
6,187.72
6,113.12
4,295.91
-1,701.76
5,957,058.060
705,336.684
0.75
4,615.88
8,177.74
33.37
318.79
6,266.63
6,192.03
4,335.18
-1,735.80
5,957,096.378
705,301.575
0.34
4,664.10
8,272.50
33.26
318.92
6,345.81
6,271.21
4,374.37
-1,770.04
5,957,134.612
705,266.266
0.14
4,712.30
8,367.58
33.24
320.82
6,425.33
6,350.73
4,414.23
-1,803.64
5,957,173.524
705,231.587
1.10
4,75092
8,462.45
33.21
321.98
6,504.69
6,430.09
4,454.85
-1,836.07
5,957,213.237
705,198.053
0.67
4,809.89
8,558.11
33.31
321.84
6,584.68
6,510.08
4,496.14
-1,868.43
5,957,253.620
705,164.566
0.13
4,859.47
8,652.23
33.25
320.95
6,663.37
6,588.77
4,536.50
-1,900.66
5,957,293.075
705,131.245
0.52
4,908.12
8,748.19
33.25
321.16
6,743.62
6,669.02
4,577.42
-1,933.73
5,957,333.067
705,097.061
0.12
4,957.57
8,842.79
33.19
321.65
6,822.76
6,748.16
4,617.93
-1,966.06
5,957,372.666
705,063.629
0.29
5,006.40
57172018 3:38:48PM Page 5 COMPASS 50001 Build 810
BP
by Final Survey Report 113AFVR
GEcumOany
Company:
Project:
Site:
Well:
Wellbore:
Design:
Survey
North America - ALASKA- BP
PBU
11
11-23
11-23BPB1
11-23BPB1
MD Inc
(usft) (°)
8,938 17
9,033.11
9,128.44
9,223.38
9,318.09
9,413.02
9,508.00
9,602.91
9,697.62
9,794.09
9,888.54
9,983.23
10,076.63
10,172.22
10,268.24
10,362.71
10,458.32
10,552.49
10,584.44
10,615.00
DRILLING LINER 1
10,652.84
10,683.66
10,715.03
10,746.91
10,777.57
10,810.08
Local Coordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 11-23
11-23B Actual 74.60usft (P272 Actual)
11-23B Actual 74.60usft (P272 Actual)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
51172018 3:38:48PM Page 6 COMPASS 5000.1 Build 81D
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(°)
(usft)
(welt)
(usft)
(usft)
(usft)
(usft)
(°HOousft)
(usft) _
33.10
322.94
6,902.62
6,828.02
4,659.18
-1,997.95
5,957,413.027
705,030.614
0.75
5,055.75
33.28
322.10
6,982.07
6,90747
4,700.43
-2,029.58
5,957,453.380
704,997.868
0.52
5,105.08
33.33
322.05
7,061.74
6,987.14
4,741.72
-2,061.75
5,957,493.768
704,964.572
0.06
5,154.59
33.38
322.17
7,141.05
7,066.45
4,782.91
-2,093.81
5,957,534.064
704,931.393
0.09
5,203.98
33.25
322.37
7,220.19
7,145.59
4,824.05
-2,125.64
5,957,574.311
704,898.442
0.18
5,253.24
33.40
321.00
7,299.51
7,224.91
4,864.97
-2,157.97
5,957,614.321
704,864.996
0.81
5,302.46
33.14
320.43
7,378.93
7,304.33
4,905.30
-2,190.97
5,957,653.725
704,830.909
0.43
5,351.33
33.29
320.08
7,458.33
7,383.73
4,945.27
-2,224.21
5,957,692.767
704,796.582
0.26
5,399.95
33.31
320.53
7,537.49
7,462.89
4,985.28
-2,257.42
5,957,731.845
704,762.284
0.26
5,448.59
33.32
321.68
7,618.11
7,543.51
5,026.52
-2,290.69
5,957,772.148
704,727.895
0.65
5,498.41
32.46
323.59
7,697.42
7,622.82
5,067.27
-2,321.82
5,957,812.027
704,695.656
1.43
5,547.07
32.79
324.65
7,777.17
7,702.57
5,108.64
-2,351,73
5,957,852.549
704,664.612
0.70
5,595.92
33.23
324.56
7,857.17
7,782.57
5,151.00
-2,381.84
5,957,894.069
704,633.356
0.46
5,645.78
33.30
324.29
7,935.42
7,860.82
5,192.76
-2,411.70
5,957,934.982
704,602.354
0.18
5,694.98
32.22
326.69
- 8,016.17
7,941.57
5,235.81
-2,441.07
5,957,977.002
704,571.817
1.85
5,745.06
30.50
329.75
8,096.84
8,022.24
5,277.42
-2,466.91
5,958,018.083
704,544.840
2.41
5,793.0C
30.74
329.96
8,179.12
8,104.52
5,319.53
-2,491.37
5,958,059.504
704,519.236
0.27
5,840.78
30.64
330.46
8,260.10
8,18550
5,361.24
-2,515.24
5,958,100.540
704,494.218
0.29
5,887.99
30.77
330.24
8,287.57
8,212.97
5,375.42
-2,523.32
5,958,114.490
704,485.761
0.54
5,904.02
31.37
330.13
8,313.75
8,239.15
5,389.10
-2,531.16
5,958,127.953
704,477.546
1.98
5,919.52
32.12
330.00
8,345.93
8,271.33
5,406.36
-2,541.09
5,958,144.925
704,467.139
1.98
5,939.06
33.32
330.20
8,371.86
8,297.26
5,420.80
-2,549.40
5,958,159.132
704,458.441
3.91
5,955,42
35.01
329.38
8,397.81
8,323.21
5,436.02
-2,558.26
5,958,174.103
704,449.160
5.58
5,972.70
37.20
328.81
8,423.57
8,348.97
5,452.14
-2,567.91
5,958,189.947
704,439.071
6.95
5,99108
39.31
327.31
8,447.64
8,373.04
5,468.24
-2,577.96
5,958,205.768
704,428.585
7.52
6,009.58
41.55
327.05
8,472.39
8,397.79
5,485.96
-2,589.39
5,958,223.162
704,416.675
6.91
6,030.05
51172018 3:38:48PM Page 6 COMPASS 5000.1 Build 81D
BP BA ER
by Final Survey Report FUGHES
p y
Company: North Amedca- ALASKA - BP
Local Co-0rdinate
Reference:
Well 11-23
Project: PBU
TVD Reference:
11-230 Actual Q 74.60usft
(P272 Actual)
Site: 11
MD Reference:
11-23B Actual Q 74.60usft
(P272 Actual)
Well: 11-23
North Reference:
True
Wellbore: 11-23BPB1
Survey Calculation Method:
Minimum Curvature
Design: 11-23BPB1
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
AN (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Earning
DLeg
V. Sec
(usft) n
(I
(usft)
(usft)
(usft)
(usft)
Net)
(wait)
(°MOousft)
(usfU _
10,841.35
42.99
325.49
8,495.53
8,420.93
5,503.44
-2,601.07
5,958,240.322
704,404.517
5.70
6,050.3<
10,871.84
44.76
324.92
8,517.51
8,442.91
5,520.80
-2,613.13
5,958,257.334
704,391.985
5.95
6,070.72
10,904.47
47.43
324.44
8,540.13
8,465.53
5,539.98
-2,626.72
5,958,276.131
704,377.870
8.25
6,093.28
10,936.44
49.91
324.41
8,561.24
8,486.64
5,559.50
-2,640.69
5,958,295.262
704,363.373
7.76
6,116.29
10,966.97
51.66
324.24
8,580.54
8,505.94
5,578.71
-2,65448
5,958,314.089
704,349.056
5.75
6,138.94
10,999.17
53.76
324.58
8,600.05
8,525.45
5,599.55
-2,669.39
5,958,334.501
704,333.581
6.58
6,163.49
11,030.99
55.57
324.65
8,618.45
8,543.85
5,620.71
-2,684.42
5,958,355.240
704,317.974
5.69
6,188.40
11,061.37
56.89
323.53
8,635.34
8,560.74
5,641.16
-2,699.23
5,958,375.276
704,302.605
5.32
6,212.56
11096.50
59.02
324.67
8,653.98
8,579.38
5,665.28
-2,716.69
5,958,398.906
704,284.492
6.66
6,241.05
11,124.50
61.18
328.83
8,667.94
8,593.34
5,685.32
-2,730.38
5,958,418.560
704,270.256
9.81
6,26445
11,155.83
63.26
328.86
8,682.54
8,607.94
5,708.76
-2,745.16
5,958,441.584
704,254.830
9.15
6,291.43
11,187.48
65.78
331.06
8,696.16
8,621.56
5,733.49
-2,759.46
5,958,465.912
704,239.860
10.14
6,319.47
11,218.82
67.92
332.13
8,708.48
8,633.88
5,758.84
-2,773.17
5,958,490.870
704,225.463
7.52
6,347.89
11,250.18
69.58
371.75
8,719.84
8,645.24
5,784.83
-2,786.91
5,958,516.272
704,211.010
5.41
6,376.76
11,281.92
71.95
71.83
8,730.30
8,655.70
5,811.04
-2,801.08
5,958,642.277
704,196.124
7.47
6,406.33
11,313.92
74.65
1* 332.01
- 8,739.49
8,664.89
5,838.08
-2,815.50
5,958,568.909
704,180.961
8.45
6,436.6C
11,344.89
76.36
332.06
8,747.24
8,672.64
5,864.56
-2,829.56
5,958,594.992
704,166.178
5.52
6,468.21
11,376.75
77.86
331.55
8,754.35
8,679.75
5,891.93
-2,844.24
5,958,621.948
704,150.757
4.96
6,496.87
11,407.99
79.72
331.14
8,760.42
8,685.82
5,918.82
-2,858.93
5,958,648.421
704,135.328
6.09
6,527.08
1 11,438.51
81.72
330.74
8,765.35
8,690.75
5,945.15
-2,873.56
5,958,674.334
704,119.980
6.68
6,556.73
11469.63
84.10
330.60
8,789.19
8,694.59
5,972.07
-2,888.69
5,958,700.827
704,104.119
7.66
6,587.11
11,501.32
86.38
331.72
8,771.82
8,697.22
5,999.73
-2,903.92
5,958,728.058
704,088.133
8.01
6,618.23
11,533.37
87.10
331.02
8,773.64
8,699.04
6,027.82
-2,919.25
5,958,755.709
704,072.034
3.13
6,64977
11,565.74
89.89
331.34
8,774.49
8,699.89
6,056.16
-2,934.85
5,958,783.616
704,055.663
8.68
6,681.65
11,627.81
90.05
333.22
8,774.52
8,699.92
6,111.11
-2,963.72
5,958,837.741
704,025.293
3.04
6,743.00
11,721.99
90.11
331.53
8,774.39
8,699.79
6,194.55
-3,007.39
5,958,919.943
703,979.346
1.60
6,836.11
11,816.44
90.08
331.69
8,774.23
8,699.63
6,277.64
-3,052.30
5,959,001.762
703,932.170
0.17
6,929.30
5/172018 3:38:48PM
Page 7
COMPASS 5000.1 Build 81D
BP
zWby Final Survey Report gUBAKGHES
Emmp ny
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well 11-23
Project:
PBU
TVD Reference:
11-236 Actual@ 74.60usft (P272 Actual)
Site:
11
MD Reference:
11-238 Actual @ 74.60us8 (P272 Actual)
Well:
11-23
North Reference:
True
Wellbore:
11-23BPB1
Survey Calculation Method:
Minimum Curvature
Design:
11-23BPB1
Database:
EDM R5K - Alaska PROD - ANCP1
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(ush) (`)
(°)
Waft)
lush)
(usft)
(ustt)
(usR)
(usft)
(°NOousft)
(usft)
11,911.22
90.42
331.31
8,773.82
8,699.22
6,360.93
-3,097.52
5,959,083.774
703,884.672
0.54
7,022.7E
12,005.25
91.40
331.30
8,772.33
8,697.73
6,443.40
-3,142.66
5,959,164.967
703,837.279
1.04
7,115.45
12,099.51
91.61
331.56
8,769.85
8,695.25
6,526.16
-3,187.73
5,959,246.444
703,789.958
0.35
7,208.36
12,194.73
91.40
331.81
8,767.35
8,692.75
6,609.96
-3,232.87
5,959,328.963
703,742.522
0.34
7,30229
12,289.66
91.02
334.56
8,765.35
8,690.75
6,694.65
-3,275.68
5,959,412.443
703,697.398
2.92
7,396.31
12,384.18
90.97
332.88
8,763.70
8,689.10
6,779.38
.3,317.53
5,959,495.990
703,653.242
1.78
7,490.05
12,478.66
91.15
329.90
8,761.96
8,687.36
6,862.31
-3,362.75
5,959,577.629
703,605.750
3.16
7,563.18
12,573.50
92.01
328.58
8,759.34
8,684.74
6,943.77
-3,411.24
5,959,657.724
703,555.043
1.66
7,675.99
12,667.81
93.15
327.50
8,755.10
8,680.50
7,023.70
-3,461.11
5,959,736.247
703,502.996
1.66
7,767.80
12,762.16
91.91
329.72
8,750.93
8,676.33
7,104.16
-3,51020
5,959,815.318
703,451.712
2.69
7,859.85
12,856.75
89.09
333.84
8,750.10
8,675.50
7,187.47
-3,554.91
5,959,897.369
703,404.726
5.28
7,953.19
12,949.54
89.25
334.91
8,751.45
8,676.85
7,271.13
-3,595.03
5,959,979.882
703,362.316
1.17
8,045.34
13,043.82
87.12
333.16
... X8,754.43
8,679.83
7,355.54
-3,636.29
5,960,063423
703,318.749
2.92
8,138.87
13,138.22
86.94
329.61
8,759.33
8,884.73
7,438.59
-3,681.43
5,960,144.890
703,271.349
3.76
8,231.80
13,233.12
91.13
330.24
8,760.93
8,686.33
7,520.68
-3,728.97
5,960,225.639
703,221.569
4.46
8,324.90
13,326.54
94.45
333.45
8,756.38
8,681.78
7,602.92
-3,772.99
5,960,306.636
703,175.304
4.94
8,417.00
13,422.51
94.38
338.09
8,748.99
8,674.39
7,690.16
-3,812.25
5,960,392.750
703,133.661
4.82
8,512.26
13,516.50
95.92
338.89
8,740.55
8,665.95
7,777.24
-3,846.57
5,960,478.855
703,096.956
1.84
8,605.77
13,612.65
95.14
342.05
8,731.28
6,656.68
7,86743
-3,878.56
5,960,568.120
703,062.499
3.37
8,701.46
13,643.29
96.61
343.82
8,728.14
8,653.54
7,896.56
-3,887.50
5,960,596.996
703,052.757
7.49
8,731.92
13,675.78
97.81
344.11
8,724.07
8,649.47
7,927.54
-3,896.40
5,960,627.716
703,043.004
3.80
8,764.11
13,705.46
99.91
344.69
8,719.50
8,644.90
7,955.78
-3,904.29
5,960,655.731
703,034.344
7.33
8,793.38
13,750.46
99.91
344.69
8,711.75
8,637.15
7,998.54
-3,916.00
5,960,698.145
703,021.468
0.00
8,837.62
Projection to TD
5/172018 3..38:48PM Page 8 COMPASS 5000.1 Build 810
5/17/2018 3:38:48PM Page 9 COMPASS 5000.1 Budd 81D
BP
BAF�UGHES
by
Final Survey Report
GEmmpany
Company:
North America
- ALASKA - BP
Local Coordinate Reference:
Well 11-23
Project:
PBU
TVD Reference:
11-23B Actual @ 74.60usft (P272 Actual)
Site:
11
MD Reference:
11-23B Actual @ 74.60usft (P272 Actual)
Well:
11-23
North Reference:
True
Wellbore:
11-23BPB1
Survey Calculation Method:
Minimum Curvature
Design:
11-23BPB1
Database:
EDM R5K - Alaska PROD - ANCP1
Casing Points
Measured
Vertical
Casing Hole
Depth
Depth
Diameter Diameter
(usft)
(usft)
Name
(in) (in)
6,443.00
4,901.84
9 5/8" Surface Casing
9.625 12.250
10,615.00
8,313.75
DRILLING LINER 1
7 000 9.875
Design Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+E/ -W
(uaft)
(Ueft)
(usft)
(usft)
Comment
6,114.60
4,709.34
3,22049
-1,030.67
11-23BPB1 TIP
6,443.00
4,901.84
3,463.52
-1,138.93
KOP-TOWS
6,473.36
4,920.12
3,485.40
-1,149.33
BOWS
6,563.51
4,979.24
3,546.23
-1,179.78
Interpolated Azimuth
13,750.46
8,711.75
7,998.54
-3,916.00
Projection to TD
I
Prepared By: Yosha Regbirsingh Survey Manager Baker Hughes a GE Company
5/17/2018 3:38:48PM Page 9 COMPASS 5000.1 Budd 81D
WELLBORE DETAIL$: 11-238 fd:ffWT'CEKpNullOx
„-238 faa4tle�(X'EIXNmrca We111RS irvpXW�
v.n�.i Pv01Xa..rc.: 1.. T.3Pplel®>amuAry3MMuzO �,y�,A
BpER !>•iY'
yea eaopn Xebemr. tlaerwui®>4mwryinncs0
TI¢on MD: 11231.92 Cakuh4m ltalbl Ak:nunCuwWa GEmml>anv
b
iw Nnn
Prolel PBU
Site: 11
Well n
uy�w'�x.u:vr
"9'eF1°
-z3
rWeb. 11-28
Desn:te(11-n11-sB)
a•P�srn g
.0 ��
Post Drilling
Easting (500 usG/in)
Easting(500 usftfin)
AOGCC
b
J
O O O J
P
O O
O
g
O
O
O
O
O
O
W W A
O O O O
m m
m m J
m
O
O
O
O
O
O
59625 W
59b2500
11-238
596p00
pp
8618
:59620W
0
595t5oo.
4
n"
.opo
op
L2
-013A
,y00
sss,sa0
qi
h
11-23
5961000
m
-
m
N
9665
.5961000
qq
8 S
�O
D5W.
11-30 '
T1 38PB
69
800
OOB
5960500
�N
SO
11 -09A
5951000'.'
'1
8000
�`,
"'in
5960000
11-30A
m^p
Y
.
7500
5959500
-
p
15
pa
:5959500
0
0h
-70 8500
5959000.
11 -289
co
5959DOD
C 59s8500'
11-28A
ry
6
g
484120
.g 0000
7500
2
59589Y)C)
L3-23
50
p 5gr�pp.
h$
@
8500
-7000'5958900
-
11-28
0
0
O�
OO
000 1 -10
MOO
00
5957500
-6000'
0
�p
5oo
500' 11-33
5951000'y�'
d,6.
00
p5956500-.
�®
es 2y
5956500
Z
q50
0 S
500
00000.
S,yiWO-.
O p
pU d3
11-08 )
5956000
ro
y s5
1
SOo
5955500.
h
4500
5955500
11-23BACTUAL
0
59550o0
os�
a000 sow
5955000
o
yp
a 00
S SS
5954500
1p111
5950500
p0 80 60,00
5954000g
�(2cP
Do
� SS;
'5950 000
hM pt�
y 0
�
rA535pp.
0
y
�00
.00 $953500
Lisburne
Wp 1.0
o o 0 o
am o o
o
'.5953000
5952500
59525W
11-13A
m m
0 J
O O
N
O
_... -
O
O O O
11-13
—
J
Or3
O O O O O O O
O
O
O
O
J
W
O
a
N
O
O
O
c.
O
J—
J o
m
J
O
m
m
O
m
d
O
O
O
J
O O
O
N
O O
Easting(500 usftfin)
AOGCC
N01001?L Post Drilling
North America -ALASKA - BP
PBU
11
11-23
11-23B
11-23B
Anticollision Summary Report
17 May, 2018
BA ER
BAT
a GE company
FAAarOTG4I TCO COO lo.
BP
by Anticollision Report BAF�UGHES
E,..,,
Company:
North America - ALASKA - BP
Project:
POU
Reference Site:
11
Site Error:
0,00usft
Reference Well:
11-23
Well Error:
0.00usft
Reference Wellbore
11-23B
Reference Design:
11-23B
Local Cc -ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 11-23
11-23BActual @ 74.60usft (P272 Actual)
11-238 Actual @ 74.60usft (P272 Actual)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
11-23B
'filter type:
NO GLOBAL FILTER: Using user defined selection & filtering criteria
To
merpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 500.00osft Error Surface:
Elliptical Conic
Survey Program
Date 5/16/2018
From
To
(usft)
(usft( Survey (Wellbore)
Tool Name
Description
117.60
598.80 Sperry Boss Gyro MS WRP 57.0' Copy (11
BOSS -GYRO
Sperry -Sun BOSS gyro multishot
598.60
6,114.60 MWD (11-23)
MWD
MWD - Standard
6,443.00
11,281.92 BHGE MWD_IIFR_MSA 812"(11-23BPB
MWD+IFR+MS-WOCA
MWD +IFR+Multi Station W/O Crustal
11,287.00
15,121.75 BHGE MWD_IIFR_MSA_ 6-1/8"(11-23B)
MWD+IFR+MS-WOCA
MWD +IFR+Mulfi Station W/O Crustal
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
11
11-08 - 11-08 - 11-08
514.24
500.00
297.90
12.66
285.24
Pass - Major Risk
11-09 - 11-09 - 11-09
843.75
825.00
53.13
16.18
36.98
Pass - Major Risk
11 -09 -11 -09A -11-09A
844.64
825.00
53.13
16.19
36.97
Pass - Major Risk
11-10 - 11-10 - 11-10
540.74
525.00
56.13
11.69
44,44
Pass - Major Risk
11 -10 -11 -10A -11-10A
540.74
525.00
56.13
11.69
44.44
Pass -Major Risk
11-11 - 11-11 - 11-11
586.69
575.00
174.65
11.97
162.68
Pass - Major Risk
11-13 - 11-13 - 11-13
558.47
550.00
413.36
11.81
401.55
Pass - Major Risk
11 -13 -11 -13A -11-13A
558.47
550.00
413.36
11.81
401.55
Pass -Major Risk
11-23- 11-23- 11-23
6,442.60
6,425.00
0.03
26.63
-19.38
FAIL - Major Risk
11 -23 -11 -23A -11-23A
11,379.92
11,450.00
167.08
198,42
-29.10
FAIL - Major Risk
11-23-11-23BP81-11-23BPB1
13,752.65
13,750.46
5.76
80,01
-59.79
FAIL - Major Risk
11-28-11-28-11-28
1,382.71
1,475.00
287.28
37.03
251.88
Pass -Major Risk
11 -28 -11 -28A -11-28A
1,388.30
1,475.00
287.47
37.22
251.91
Pass -Major Risk
11 -28 -11 -28B -11-28B
1,386.30
1,475.00
287.47
37.22
251.91
Pass -Major Risk
11-30-11-30-11-30
9,326.98
9,325.00
241.18
434.96
-184.46
FAIL - Major Risk
11 -30 -11 -30A -11-30A
9,326.98
9,325.00
241.18
429.17
-180.30
FAIL - Major Risk
11-33-11-33-11-33
510.91
500.00
207.74
9.36
198.41
Pass - Major Risk
Plan Lisburne - Plan Lisburne - Lisburne Alp 1.0
565.54
550.00
112.96
13.24
99.71
Pass - Major Risk
L2
1.2 -08 -L2 -08A -1.2-08A
14,408.71
15,588.00
235.55
387.84
-145.09
FAIL - Major Risk
L3
1.3-23 - L3-23 - 1.3-23
11,031.19
10,350.00
317.86
272.74
53.18
Pass - Major Risk
5(17201811: 11:49AM // JJ // )6f(ge 2 of!T // - // COMPASS 5000.1 Build 81D
BP
by Anticollision Report BAF�UGHES
E—pam
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
11
Site Error:
0 0ousft
Reference Well:
11-23
Well Error:
O.00usft
Reference Wellbore
11-23B
Reference Design:
11-23B
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 11-23
11-23B Actual @ 74.60usft (P272 Actual)
11-238 Actual @ 74.60usft (P272 Actual)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference Depths are relative to 11-23B Actual @ 74.60usft (P272 Coordinates are relative to. 11-23
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK
Central Meridian is 150` 0'0.000 W ° Gtltl Convergence at Surface is: 1.58°
5'172018 11: 11 49A // JJ " ) J �{ge 3 of! // v J/ V COMPASS 5000.1 Build 81D
Printed 6/132016 147:34PM
North America - ALASKA - BP
Page 1 of 2
Cementing Report
Common Well Name: 11-23 / 02
- _ - - - -- - -- - - --
- -- Report no.: 7 Report date: 5/6/2018
Protect: PBU
Sae 11
Spud Daterlime: 7/11/1986 --- -
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 424/2018 Entl Date: 5/18/2018
AFE No.:
Contractor PARKER DRILLING CO.
Rig Name/No.: PARKER 272 Rip Release: 5/202018 X3-018Y4-C: (6,086,993.00)
SPUO1: USA00001229
-
Active datum: 11-238 Actual @74.60usft (some Mean See Level)
--
General Information
Job type: Primary
Cement job start date/time: 5/6/2018 330P
Job end date/time. 5/6/2018 6:OOPM
Cement Company: SCHLUMBERGER
Cementer: DYLAN WAUGH
Cemented String: INTERMEDIATE CASING 1
String Size: 7.000 (in)
String Set TMD: 10,615.00 (usft) Hole Size: 9.875 (in)
Pipe Movement
Pipe Movement. RECIPROCATING
Rotating Time (Start-End):
RPM.
Rotating Torque (Initlavg/max): (ft-1131)
Reciprocating Time (Start-End).
Recip Drag Up/Doom-. - (kip)
SPM: Stroke Length:
F1rNd Name: SPACER
Fluids (1 of 2)
Slurry Type: SPACER
Purpose: SPACER
Class:
Description:
MUD PUSH II Density: 12.00 (ppg)
Yield:
Mix Water Ratio:
Excess:
Mix Method: BATCH
Sacks Used:
Water Volume:
0.0 (bbl) Excess Slurry Volume:
0.0 (bbl) Density Measured by:
Other Volume:
Total Vol in Well:
Slurry Volume:
40.0 (bbl) Excess Measured From:
Mud Type:
Density:
10.30 (ppg) PV: 9.00 (cp)
YP: 18.000 (tbf/100fP) Viscosity: 37.00 (s/qt)
Gels 10 Sec: 7.000 (Ibf/100ft2)
Gels 10 Min:
9.000 (ibf/100ft-)
Fluid Name: CEMENT
Fluids (2 of 2)
Slurry Type: CEMENT
Purpose: PRIMARY
Class:
G-CLASS Description:
TAIL SLURRY Density: 15.80 (ppg)
Yield: 1.1600 (M/sk)
Mix Water Ratio:
5.099 (gal/sk94) Excess:
Mix Method: ON-THE-FLY
Sacks Used: 468.50 (941b sacks)
Water Volume:
56.9 (bbl) Excess Slurry Volume:
Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well:
Slurry Volume:
96.8 (lobi) Excess Measured From
Mud Type:
Density'.
10.30 (ppg) PV: 9.00 (cp)
YP: 18.000 (Ib1110Dft2) Viscosity: 37.00 (s/qt)
Gels 10 Seo 7.000 (Ibf1100W)
Gels 10 Min:
9.000 (Ibf/100ft')
AdUSWaa
Name
Type
Amount
Units
Concentration Unit
D047
ANTIFOAMAGENT
0.050
GAUSX
D065
DISPERSANT
0.300
%BWOC
D167
FLUID LOSS
0.400
% BWOC
D177
RETARDER
0.015
GAUSX
Printed 6/132016 147:34PM
Printed 6/13/2018 1:47'.34PM
Pape 2 of 2
North America - ALASKA - EIP
Cementing Report
Common Well Name: 11-23 / 02
Repo nn not Report tlale: 5/8/2018
Project. PBU
site 11
Spud Dale/Time_7/11/1986_
Event Type: RE-ENTER- ONSHORE (RON)
I Start Date: 4/24/2018 End Date5/16/2018
AFE No.:
Contractor PARKER DRILLING CO.
Rig Name/No.: PARKER 272 ,Rig Release: 5/20/2018
X3-018v4-C: (6,086,993.00 )
BPUOI: USA00001229
.I Active datum: 11-238 Actual @74 60usft (above Mean Sea Level)
Fluid Tea%
Thick time
Thick
Free water
Free water
Fluid lass
Fluid loss
Fluid loss
Comp
Comp
Comp
Comp
Comp Strength
Comp Strength
(hr)
temp.
(%)
temp.
(ccJ30min)
temp.
press.
Strength
Strength
Strength
Strength Time
Pressure 2
Temperature 2
(°F)
(°F)
("F)
(psi)
Time 1
Pressure 1
Temperature 1
2
(psi)
(°F)
min(psi)
°F)
min
4.33
0.00
80.00
56.0
115.00
1,000.00
Stages
Stage
T Stage Type
Est. Top
Est. Bottom
Mud Circ.
Mud Circ.
Tap
Bottom
Plug
Pressure
Front
Pressure
Retums
Circulate
Cmt Vol to
Total
Annular
no.
(usft)
(usft)
Rale
Press.
Plug
Plug
Bumped
Bumped
Held
Held
Prior
Surtace
Mud Lost
Flow
Win
(psi)
(hr)
(bbl)
(bbl)
After
(moi)
(min)
1
rRtMARY CEMENT
8,480.001
10,615,001
1
1 v
I v
v
I
I v
Pumping Schedule
Fluid pumped Volume
Avg,
Max Disp.
Slurry ToSlurry Base Start Mix Clint
Start Slurry
Pumping end
Start Disp Foam
Gas Type
Gas Vol
BH circ.
Bh static
Pumped
Disp.
Rate
TWO TMD
PmP
date/time
job
Used
temp.
temp.
(bbl)
Rate
(bbVmin)
(usft) (usft)
(scf)
bbVmin
Tests
Casing Tut
Shoe Test
Liner Top Test
Test Pressure. 3,500.00 (psi)
FIT/LOT: (PPg)
Liner Overlap: (usft)
Time: 30 (min)
Tool: N
Positive Test: (ppg)
Positive Tut Tool: N
Cement Found between Shoe and Collar:
N
Open Hole Length: Well)
Negative Test: (Ppg)
Negative Test Tool: N
Hours Before Start: (hr)
Time before test: (hr)
Cmt Found on Tool: N
Log/Survey Evaluation
Interpretation Summary
CBL Run: N
Cement Top: (usft)
Under Pressure: (psi)
How Determined:
Bond Quality:
TOC Sufficient: N
CET Run: N
Job Rating:
Bond Quality:
If Unsuccessful, Detection Indicator:
Temp Survey: N
Remedial Cement Required: N
Him Prior to Log: (hr)
Haw Determined:
Printed 6/13/2018 1:47'.34PM
Pnnted 6/13/2018 1:48:34PM
North America - ALASKA - BP
Page i of 3
Cementing Report
Common Well Name: 11-23103
, Report no 2 Report date 5/17/2018
Project: PBU
Site: 11 -- - -
Spud Date/Time: 7/11/1966
Event Type: COM- ONSHORE (CON)
Start Date: 5/16,1018 End Date: 5/20/2018
AFE No.:
Cordrerxar. PARKER DRILLING CO.Rig
Name/No.: PARKER 272 Rig Release: 5/10/2018 X3-018Y4-C: (2,588,804.00)
BPUOI: USA00001229
Active datum: 11-23B Actual ®74.60usft (above Mean Sea Level)
eenwal information
Job type: Primary
Cement job start date/time: 5/17/2018 300A
Job end date/time: 5/17/2018 6:OOAM
Cement Company: SCHLUMBERGER
Cementer:
Cemented String: PRODUCTION LINER 1
String Size: 4.500 (in)
String Set TMD: 15,155.00 (usft) Hole Size:
6.125 (in)
Pipe Movement
Pipe Movement: RECIPROCATING
Rotating Time (Start-End):
RPM.
Rotating Torque (init/avg/max): (ft-lbo
Reciprocating Time (Start-End):
Recip Deg Up/Down: - (kip)
SPM: Stroke
Length:
Fluid Name: SPACER
Fluids (1 of 2)
Slurry Type. SPACER
Purpose: SPACER
Class:
Description:
MUD PUSH II Density:
12.00 (ppg)
Yield.
Mix Water Ratio:
Excess:
Mix Method:
BATCH
Sacks Used:
Water Volume:
Excess Slurry Volume:
0.0 (bbl) Density Measured by:
DENSOMETER
Other Volume:
Total Vol in Well:
Slurry Volume:
30.0 (b61) Excess Measured From:
Mud Type:
Density:
8.50 (ppg) PV: 0.00 (cp)
YP: 0.000 (IM/100ft-) Viscosity:
0.00 (s/qt)
Gels 10 Sec: 0.000 (I0100T)
Gels 10 Min:
0.000 (Ibf/100ft')
Fluid Name: CEMENT
Fluids (2 of 2)
Slurry Type: CEMENT
Purpose: PRIMARY
Class:
G-CLASS Description:
TAIL SLURRY Density:
15.80 (ppg)
Yield: 1.1700 ("Sk)
Mix Water Ratio:
5.157 (gallsk94) Excess:
30.00(%) Mix Method:
Sacks Used: 552.00 (9411b sacks)
Water Volume:
67.8 (bbl) Excess Slurry Volume:
26.5 (bbl) Density Measured by:
DENSOMETER
Other Volume:
Total Vol in Well:
Slurry Volume:
115.0 (bbl) Excess Measured From:
EST. GAUGE HOLE
Mud Type:
Density:
8.50 (ppg) PV: 0.00 (cp)
YP: 0.000 Qbf/101)fn Viscosity:
0.00 (s/qt)
Geis 10 Sec: 0.000 (Ibf/100ft-)
Gels 10 Min:
0.000 (lbul00R.)
Pnnted 6/13/2018 1:48:34PM
Printed 6/132018 1:48:34PM
North America - ALASKA - BP
Page 2 or 3
Cementing Report
Common Well Name: 11-23 / 03
FReport no.. 2
Report date: 5/17/2018
Project: PBU
Project: PBU
Site 11
11Event
Spud DateRime: 7/11/1986
AFE No.:
X3 -018Y4 -C: (2,588,604.00 )
I -S&
Type: COM- ONSHORE (CON) Start Date 5/16/2018 Entl Oete: 520/2018
Contractor: PARKER DRILLING CO.
RigName/No.. PARKER 272 Rig Release: 5/20/2018_
BPUOI: USA00001229
Active datum'. 11-238 Actual @74.60usft (above Mean Sea Level)
AddSlvaa
Name
Type
Amount Units
Concentration Unit
D047
ANTIFOAMAGENT
1.000 GAL/SX
D206
ANTIFOAMAGENT
1.000 GAL/BBL
D056
DISPERSANT
5.000 %BWOC
D167
FLUID LOSS
2.000 %BWOC
D600 G
GAS -BLOCK
2.000 GAUSX
D177
RETARDER
0.040 GAL/SX
Fluid Tl e s
Thick time
Thick
Free "ter
Free water Fluid loss Fluid loss Fluid loss Comp Comp
Comp
Camp
Comp Strength
Comp Strength
(hr)
temp.
(%)
temp, (cc/30min) temp. press. Strength Strength
Strength
Strength Time
Pressure 2
Temperature 2
(°F)
(°F)
("F) (psi) Time 1 Pressure 1
Tempereture 1
2
(psi)
(°F)
min (psi)'F
(min)
4.62
0.00
80.00
28.0 165.00 1,000.001 1
Stages
Stage
Stage Type
Est. Top
Est. Bottom
Mud Circ.
Mud Circ.
Top
Bottom
plus
Preesara
Float
pressure
Retums
Cmt Vol to
Total Annular
no.
(usft)
I
(usrt)
Rate
(gpm)
Press.
(psi)
Plug
Plug
I I
dumped
Bumped
(psi)
Hem
Held
(mini
JCirCUIate
Prior
(hr)
Surface
(bbl)
Mud Lost Flow
(bbl) After
I
RIMARY CEMENT
10,441.00
15,155.00
y
Pumping Schedule
Fluid pumped
Volume
Avg.
Max Disp.
Slurry Top
Slurry Base
Start Mix Cmt
Start Slurry
Pumping end
Start Disp
Foam
Gas Type
Gas Vol
BH circ.
Bh static
Pumped
Disp.
Rate
TMD
TMD
Pmp
date/time
job
Used
temp
temp.
(bbl)
Rate
(bbl/min)
(usR)
(usH)
(sof)
bbVmin
Printed 6/132018 1:48:34PM
Printed 6/13/2018 1:48:34PM
North America - ALASKA - BP
Page 3 of 3
Cementing Report
Canaan Wall Name: 11-23103
Report no, 2 Report tlate: 5/17/2078
Project: PBUSite:
11
Spud DateRime: 7H7/1886
Event Type: COM- ONSHORE (CON)
Start Date: 5/16/201 B End Data: 5/20/2018AFE
Contractor PARKER DRILLING CO.
Rip Name/No.:
PARKER 272 Rig Release: 5/20Y2018
X3 -018V4 -C: (2,588,804.00)
BPUOI: USA00001229
Active datum: 11-238 Actual (M74.e0usft (above Mean Sea Level)
Tab
Casing Tat
Shoe Test
Liner Top Tot
Tot Pressure: 3,600.00 (psi)
FIT/LOT:
(PPg)
Liner Overlap: (usft)
Time: 30 (min)
Tool:
N
Positive Test: (Ppg)
Positive Test Tool: N
Cement Found between Shoe and Collar: N
Open Hole Length:
(usft)
Negative Test: (Ppg)
Negative Test Tool: N
Hours Before Start:
(hr)
Time before test: (hr)
Cmt Found on Tool: N
Log/Survey Evaluation
Interpretation Summary
CBL Run: N
Cement Top: (usft)
Under Pressure: (psi)
How Determined:
Bond Duality:
TOC Sufficient: N
CET Run: N
Job Rating:
Bond Duality:
If Unsuccessful, Detection Indicator:
Temp Surrey: N
Remedial Cement Required: N
Hos Poor to Log: (hr)
How Determined:
Printed 6/13/2018 1:48:34PM
PTD R/$ — 0 i
Loepp, Victoria T (DOA)
From: Gorham, Bradley M <Bradley.Gorham@bp.com>
Sent: Tuesday, April 10, 2018 9:37 AM
To: Loepp, Victoria T (DOA)
Subject: RE: PBU 11-23B (PTD 218-029) - LOT to FIT
Follow Up Flag: Follow up
Flag Status: Flagged
Thanks Victoria, apologies for the confusion.
Brad Gorham
BP Exploration (Alaska), Inc.
Drilling Engineer
W: (907)564-4649
C:(907)223-9529
Bradley.Gorham@bp.com
From: Loepp, Victoria T (DOA)[mailto:victoria.loepp@alaska.gov]
Sent: Tuesday, April 10, 2018 7:36 AM
To: Gorham, Bradley M <Bradley.Gorham@bp.com>
Cc: Lastufka, Joseph N <Joseph. Lastufka@ bp.com>; Davies, Stephen F (DOA) <steve.davies@alaska.gov>
Subject: RE: PBU 11-23B (PTD 218-029) - LOT to FIT
Brad,
Approval is granted to conduct an FIT to 12.6 ppg EMW when drilling out of the 9-5/8" instead of performing an LOT as
was approved in the PTD. This will provide at least a 25 bbl kick tolerance according to your calculations. Please include
this approval with the approved PTD.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria. Loepp(cbalaska.goy
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or Victoria. Loeop4alaska.aov
From: Loepp, Victoria T (DOA)
Sent: Tuesday, April 10, 2018 7:14 AM
To: Gorham, Bradley M (Brad lev.Gorham Ca) bp.com) <Bradley.Gorham@bp.com>
Cc: Lastufka, Joseph N (Joseph.Lastufka@bp.com) <Joseph.Lastufka@bp. com>; Davies, Stephen F (DOA)
<steve.davies@alaska.Rov>
Subject: FW: PBU 11-23B (PTD 218-029) - LOT to FIT
Brad,
As you know, this PTD has been approved and returned. The approved permit was for PBU 11-23B(PTD 218-029)(both
the well name and PTD # you referenced below were incorrect). I'm not sure why this request was sent to Steve; this
question certainly could have been addressed sooner with the correct routing. I will verify your calculations this
morning and let you know.
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria. LoeppRa laska.a ov
CONFIDENTIALfrY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or Victoria Loepo@alaska.aov
From: Davies, Stephen F (DOA)
Sent: Monday, April 09, 2018 1:47 PM
To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.eov>
Cc: Schwartz, Guy L (DOA) <euy.schwartz@alaska.gov>; Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov>
Subject: FW: PBU 11-23 (PTD 218-092) - LOT to FIT
Sorry, I overlooked Brad's request, below. Should have passed it along to you all a long time ago. Would you mind
sending Brad an email discussing the correct action to take with a CC to me?
Thanks,
Steve D.
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission
(AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use
or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding
it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve davies@alaska.gov.
From: Gorham, Bradley M [ma iIto: Brad ley.Gorham@bp.com]
Sent: Monday, April 9, 2018 1:35 PM
To: Davies, Stephen F (DOA) <steve.davies@alaska.f;ov>
Subject: PBU 11-23 (PTD 218-092) - LOT to FIT
Steve,
Have you had a chance to review the request below? We are working to finish the well program and would like to have
this finalized one way or another.
Don't hesitate to contact me if you have any questions or concerns.
Thanks,
Brad
Brad Gorham
BP Exploration (Alaska), Inc.
Drilling Engineer
W: (907)564-4649
C:(907)223-9529
Brad Iey.Gorham(@bp.com
From: Gorham, Bradley M
Sent: Thursday, March 29, 2018 8:18 AM
To: Davies, Stephen F (DOA) <steve davies@alaska.Qov>
Subject: PBU 11-23 (PTD 218-092) - LOT to FIT
Steve,
I am not sure where you are in the approval process of the 11-23B but I wanted to update you with a proposed change.
Due to the fact the 9-5/8" casing is uncemented at the planned kick off point, there is potential to induce wellbore
breathing in the CM formation when conducting the LOT. We would like to change the planned LOT to an FIT. To obtain
a 25 bbl kick tolerance, assuming 10.3 ppg mudweight at the intermediate TD interval we need to achieve at least a 12.1
ppg EMW. We will target a FIT value of 12.6 ppg EMW, which will provide us a 25 bbl kick tolerance if we had 10.8 ppg
EMW at TD. Although it is highly unlikely that it will be necessary to increase the mudweight above the planned 10.3
ppg, we wanted to apply a safety factor to ensure we are covered if that scenario were to occur. Please let us know is
this change is acceptable and if you have any questions or concerns.
Thanks,
Brad
Brad Gorham
BP Exploration (Alaska), Inc.
Drilling Engineer
W:(907)564-4649
C: (907)223-9529
Bradley.Gorham(@bp.com
THE STATE
°fALASKA
GOVERNOR BILL WALKER
Kenneth W. Allen
Engineering Team Lead
BP Exploration (Alaska) Inc.
P.O Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.00gcc.closka.gov
Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 11-23B
BP Exploration (Alaska) Inc.
Permit to Drill Number: 218-029
Surface Location: 1096' FSL, 364' FEL, Sec. 28, T1 IN, RI 5E, UM
Bottomhole Location: 5256' FSL, 4229' FEL, Sec. 21, TI IN, R15E, UM
Dear Mr. Allen:
Enclosed is the approved application for permit to re -drill the above referenced development well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Hollis S. French
k Chair
DATED this 2-8 day of March, 2018.
STATE OF ALASKA
'.ASKA OIL AND GAS CONSERVATION COMMIS:
PERMIT TO DRILL
20 AAC 25.005
it 1C t:1VCL!
MAR 13 2018
1a. Typeof Work:
(',�(� �
1b. Proposed Well Class: Exploratory -Gas ❑ Service - WAG ❑ Service -Disp❑
for:
ic. Sbsd
Drill ❑ Lateral ❑
Stretigrephic Test ❑ Development - Oil 0. Service - Wnj ❑ Single Zone 0
Coal iGa ./❑i-7Gas���---Illy rates ❑
Gf S'� li tl
Reddll 21. Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket 0 • Single Well ❑
11. Well Name and Number:
BP Exploration (Alaska), Inc
Bond No. 295105380.
PBU 11-2313 -
3 Address:
8. Proposed Depth:
12. Field/Pool (s ):
P.O. Box 196612 Anchorage, AK 99519-6612
MD: 15252'- TVD: 8619'
PRUDHOE BAY, PRUDHOE
OIL
4a. Location of WellGovernmental Section).
( )
7rtp
. Propeyesignation (Lease Number):
ADL 026325 8 028322 -
Surface: 1096' FSL, 364' FEL, Sec 28, T71N, R15E, UM '
S. DNR Approval Number:
13. Approximate spud date:
Top of Productive Horizon: 1214' FSL, 2897' FEL, Sec.21, TI IN, R15E, UM
70-054
April 10, 2018
F_ /s�s'zik a
Total Depth: 5258' FSL, 4229 Sec. 21, T11N, R15E, UM
9. Acres in Property: 2560
14. Distance to Nearest Property'.
36000
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KS Elevation above MSL: 74.15 -feet15.
Distance to Nearest Well Open
Surface x- 707156 • y- 5952811' Zone - ASP 4
GL Elevation above MSL: 27.20. feet
to Same Pool:
750
16. Deviated wells: Kickoff Depth: 6450 feet
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 108 degrees
Downhole: 3284 • Surface: 2457 "
18, Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casino Weiahl I Grade Coupling Len th
MD I TVD NID TVD (including sta a data
8-1/2"x9-7 7,. 26# L-80 VamTop HC 4336'
6300' 4819' 10636' 8324' 482 sx Class'G'
6-1/8" 4-1/2" 12.6# I3Cr85 VannTo 4766'
10486' 8195' 15252' 8619' 529 sx Class'G'
19. PRESENT WELL CONDITION SUMMARY (To be completed for Reddll and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft):
Plugs (measured):
Effect. Depth MD (ft):
Effect. Depth TVD (191):
Junk (measured):
13344 8702
11016
11016
8585
None
Casing Length Size Cement Volume MD TVD
Conductor/Structural 80 20" 1450#Poleset 35-115 35-115
Surface 2733 733/8' 3200 Sur CS III, 900 sx CS II 35-2768 35-2500
Intermediate 7147 9-5/8" 500 sx Class'G', 300 sx CS 1 33-7180 33-5330
Liner 5057 7" 400 sx Class'G' 6996-12053 5220-8758
Liner See Attac See Attachment See Attachment See Attachment
Perforation Depth MD (it): 11126 - 13333 Perforation Depth TVD (ft): 8661-8703
Hydraulic Fracture planned? Yes ❑ No 0
20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Gomam, Bradlev M
from without prior written approval.
Authorized Name Allen, Kenneth W Contact Email Bradley.GomamL�bp.com
Authorized Title Engineering Team Lead Contact Phone 907-564-4649
Authorized Signature Date 12hV
Commission usia Only
Permit to Drill _
Number: ���
API: 50- 029-21610-02-00
Permit Approval-
Date:
See cover letter for other
requirements:
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbedmeth ne, gas hydrates, or gas contained in shales: ❑7
Other' 06P ffS f to 35_00P51' Samples req'd: Yes ❑ , No Mud log req'd: Yes ❑ , No
/J/7o Lll a,r�Cp i 2' ve-, / tYr H2S measures Yes f/ NO ❑0 Directional Svy req'd: Yes 0/ No ❑/
f0 , - 7 U a �75 t y Spacing excephon req'd: Yes ❑ No L Inclination -only svy req'tl: Yes ❑ No t'J
Post initial injection MIT req'd: Yes ❑ No L9�
APPROVED BY
Approved by: COMMISSIONER THECOMMISSION Date: 3 Zr,I(
1/7Z-
4#1110-401
/TL 1/23�/Sn^` R� �II ��-11 I N � I � L //o J,� �-
" #110-401 Revised 5/2017 This permit Is valid .0 aL iWFnlhk tl5t! o#Lval (20 AAC 25.005(g)) �/ - Submit Ff� and 3
�/ Attachments in Duplicate
To: Alaska Oil & Gas Conservation Commission
From: Brad Gorham, ODE
Date: March 12, 2018
RE: 11-23B Permit to Drill
The 11-23B well is scheduled to be drilled by Parker 272 in April 2018. This rotary sidetrack is a
horizontal producer targeting the Zone 1 Ivishak Sands. The planned well is a two string, ultra-
slimhole design using a 9-5/8" surface casing, 7" intermediate casing, and 4-1/2" production liner.
The intermediate casing will be set at the top of the Ivishak, and the production interval will be
completed with a cemented and perforated liner.
The maximum anticipated surface pressure from the Ivishak with a full column of gas from TD to
surface is 2,457 psi (assumes 7.64 ppg EMW most likely pore pressure and a 0.1 psi/ft gas gradient).
The well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3 rams and an
annular). The BOP rams and annular will be tested to 3,500 psi.
A detailed operations summary is included with the permit application.
If there are any questions concerning information on 11-23B, please do not hesitate to use the contact
information below.
Brad Gorham Office: (907) 564-4649
Attachments:
Well Bore Schematic
Proposed Pre -Rig Schematic
Proposed Completion
Directional Package
Cell: (907) 223-9529 Email: Bradlev.Gorham(ftp com
BOPE Schematic
Well Head Schematic
Tree Schematic
11-23B PTD 1 3/12/2018
Planned Well Summary
Well 11-23B vele Producer Ob rge t Ivishak
Current Status Rotary Sidetrack
Estimated Start Date: 4/10/2018 Time to Complete: 26.0 Da s
Surface
Northing
Easting
I Offsets
TRS
Location
5952810.85
707155.97 -1
4183.1' FNL / 364.2' FEL
11N 15E Sec 28
Planned KOP: 6,450' MD Planned TD: I 15,252' MD / 8,545' TVDss
Rig: Parker 272 GL -RT: 46.95 • RTE ref MSL : 74.15 '
Directional - Baker wo08
KOP: 6,450' MD
Northin
Eastin
TVDss
Offsets
TRS
Tgt ICP
5958137
704464
8,250'
4' FNL / 2896.9
4065.FEL
11 N 15E Sec 21
Tgt TO
5962140
703012
8,545'
24.4' F 4
11 N 15E Sec 21
FEL4229
Planned KOP: 6,450' MD Planned TD: I 15,252' MD / 8,545' TVDss
Rig: Parker 272 GL -RT: 46.95 • RTE ref MSL : 74.15 '
Directional - Baker wo08
KOP: 6,450' MD
Maximum Hole Angle:
"55° in the first intermediate section
-108 in the production section
Close Approach Wells:
11-30A and L2 -08A
Survey Program:
Reference attached directional program
Nearest Property Line:
-36,000'
Nearest Well within Pool:
-150'
11-23B PTD 2 3/12/2018
Formation Tops and Pore Pressure Estimate (SOR)
Formation
Estimated
Formation
Top
TVDss)
Most Likely
Pore
Pressure
(EMW
Fluid
Type
(for sands)
SV1
4,297
8.4
water
UG4
4,826
9.5
water
UG3
5,035
9.5
water
UG1
5,740
9.5
water
WS2
6,275
9.3
water
CM3
6,700
9.7
Shale
CM2
7,150
9.8
Shale
CMl
7,683
10
Shale
THRZ
8,045
10
Shale
LCU/TSHU
8,249
7.65
gas
TSAD
8,265
7.64
gas
TCGL
8,400
7.55
gas
GWC(GCWI)
8,425
7.53
GCWI
8CGL
8,445
7.24
GCWI
24N/GWC
8,525
7.25
shale
24P
8,533
7.46
gas
23N
8,558
7.44
Shale
22P
8,595
7.42
shale
PGOC
8,645
7.29
gas
7000
8,645
7.29
Oil
TDF
8,675
7.29
Oil
BSAD/Kavik
8,709
7.29
shale
11-23B PTD 3 3/12/2018
Casing/Tubing Program
Hole Size
Liner/
WUFt
Grade
Conn
Length
Top
Bottom
1 NA
TbgO.D.
9,400' MD — 10,636MD 1 10.3-11.0-1
10-15 1 20-30 1 <5
1 <10
<20 8.5-9.5
MID /TVDss
MD/TVOss
8-1/2" x9-
7"
26#
L-80
VamTop HC
4,336'
6.300'/4,744-
10,636' 18,250'
7/8"
150' lap)
6-1/8"
4 Yz"
12.6#
13Cr-85
Vam Top
4,766'
10,486'/ 8,121'
15,252' / 8,545'
(150' lap)
Tubing
4%"
12.6#
13Cr-85
VamTop
10,491'
Surface
10,491'/8,123'
—5' into liner TBS
Mud Program
Intermediate Mud Properties: LSND
8-1/2" x 9-7/8" Hole
Section
Depth Interval Density
PV (cp) lb/100tt= API FL
HTHP FL
MBT pH
6,450' MD — 9,400' MD 9..8-10,3-1
10-15 20-30 1 <8
1 NA
<20 8.5 - 9.5
9,400' MD — 10,636MD 1 10.3-11.0-1
10-15 1 20-30 1 <5
1 <10
<20 8.5-9.5
Production Mud Pro ernes: Water Based Polymer Fluid
6-1/8" Hole Section
Depth Intervalensity
PV (cp)
YP
API FL
HTHP FL
MBT
pH
Ib/10
10,636' MD - TD e,.5-9.0
<8
12-20
<12
NA
<4
1 8.;—Qq
Logging Program
8-1/2 x 9-7/8 Sample Catchers — as required by Geology
Intermediate
Drillin Dir/GR/RES
Oen Hole: None
Cased Hole: I None
6-1/8" Production
I Sample Catchers—as r uired by Geo
Drillin
Dir/GR/RES/NEU 1 "•Z/i°
O en Hole:
None '
Cased Hole:
I None
11-23B PTD 4 3/12/2018
Cement Program
Casing Size
7" 26# L-80 amTop HC Intermediate Casin
Lead
N/A
Basis
Lead TOC
N/A
Tail
Oen hole volume + 40% excess + 80 ft shoe track
Tail TOC
1 500 ft MD above casing shoe
Spacer
-30 bbls of ViscosifiedSpacer weighted to -12.0 Mud Push II
Total Cement
Lead
N/A
Volume
Tail
99 bbls, 559 cuft, 482 sks of 15.8 lb/gal, Yield: 1.16 cuft/sk
Temp
BHST 171° F
Casing Size
4-1/2" 12.6# 13CR-80 VAM TOP Production Liner
Lead
N/A
Basis
Lead TOC
NIA
Tail
Oen hole volume + 30% excess + 80 ft shoe track + 200'4" DP x 7" LNR annulus
Tail TOC
Top of liner
Spacer
-30 bbls of Viscosified Spacer weighted to -12 Mud Push II
Total Cement
Lead
N/A
Volume
Tail
109 bbls, 614 cult, 529 sks 15.8 Ib/gal Class G -1.17 cuft/sk
Contin nc : 8.61b/ al BiModal lightweight cement in event of high lost circulation
Tem
BHST 174° F
Surface and Anti -Collision Issues
Surface Close Proximity:
No wells will be affected by the Parker 272 rig shadow.
Sub -Surface Pressure Management:
No pressure management required.
Anti -Collision:
All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan
criteria:
• L2 -08A: Shut-in at surface prior to drilling production interval
• 11-30A: Shut-in at surface with tubing tail plug prior to milling the window ✓
Offset well ownership information
All offset wells identified within 200 ft of the proposed wellbore are operated by BP.
11-23B PTD 5 3/12/2018
Hydrogen Sulfide
DS -11 is considered an H2S site. Recent H2S data from the pad is as follows:
Faults
There are no planned fault crossings.
Drilling Waste Disposal
There is no annular injection in this well.
Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and
inject at DS -04. Any metal cuttings will be sent to the North Slope Borough.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for
injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB
Environmental Advisors (659-5893) for guidance.
11-23B PTD 6 3/12/2018
Well Name
H2S Level
Date of Reading
#1 Closest SHL Well H2S Level
11-23A
24
03/28/2013
#2 Closest SHL Well H2S Level
11-09A
10
05/01/2017
#1 Closest BHL Well H2S Level
11-30A
7
01/08/2017
#2 Closest BHL Well H2S Level
11-27
15
02/19/2017
#3 Closest BHL Well H2S Level
11-39
10
08/22/2017
#4 Closest BHL Well H2S Level
11-09
10
05/01/2017
Max Recorded H2S on Pad/Facility
03-29
650 -
02/10/2016
Faults
There are no planned fault crossings.
Drilling Waste Disposal
There is no annular injection in this well.
Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and
inject at DS -04. Any metal cuttings will be sent to the North Slope Borough.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for
injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB
Environmental Advisors (659-5893) for guidance.
11-23B PTD 6 3/12/2018
Well Control
The 8-1/2" x 9-7/8" hole and 6-1/8" hole sections will be drilled with well control equipment consisting
of 5,000 psi working pressure rams (2), blind/shear rams, and annular preventer capable of handling
the maximum potential surface pressures. Based upon calculations below, BOP equipment will be
tested to 3,500 psi.
BOP test frequency for 11-23B will be 14 days with function test every 7 days. Except in the
event of a significant operational issue that may affect well integrity or pose safety concerns,
an extension to the 14 day BOP test period should not be requested.
8-1/2" x 9-7/8" Intermediate Interval
Maximum anticipated BHP
3,284 psi at the TSAD at 8,265' TVDss 7.6 ppq EMW
Maximum surface pressure
2,457 psi at the TSAD 0.10 psitft gas gradient to surface
Kick tolerance
25 bblswith 12.1 ppg frac gradient.
Kick tolerance
Assumes 7.8 ppg pore pressure in the TSAD + 0.5 ppg kick
In rit Test — 6-1/8" hole
intensitv and 10.3 MW.
Planned BOP test pressure
Rams test to 3,500 psi / 250 psi.
Planned completion Fluids
Annular test to 3,500 psi / 250 psi
Integrity Test — 8-1/2" x 9-
7/8" hole
LOT after drilling 20'-50' of new hole
7" Casing Test
3,500 psi surface pressure
6-1/8" Production Interval
Maximum anticipated BHP
3,284 psi at the TSAD at 8,265' TVDss 7.6 ppq EM
Maximum surface pressure
2,457 psi at the TSAD 0.10psi/ft gas -gradient to surface
Kick tolerance
Infinite with >9.6 ppg frac gradient.
Assumes an 7.64 ppg max pore pressure in the LSB + 0.5 ppg -
kick intensity and 8.6 ppg MW.
Planned BOP test pressure
Rams test to 3,500 psi / 250 psi.
Annular test to 3,500 psi / 250 psi
In rit Test — 6-1/8" hole
FIT after drilling20'-50' of new hole
4. oLPacker
iner Top
3,500 si surface pressure
Planned completion Fluids
8,5 ppg seawater / 2,200 ft diesel to 1,866 ft TVDss
11-23B PTD 7 3/12/2018
Drill and Complete Operations Summary
Pre -rig Work
1. PPPOT-T and PPPOT-IC. Function LDS
2. MIT -T to 3,500 psi.
3. Pull through tubing packer (TTP). Flush control lines.
4. Perform injectivity test.
5. Perform fullbore P&A. Planned top of cement at 11,038' MD.
6. Brush BPV profile. Drift and tag top of cement. Pull GLV and peform MTT log
7. MIT -T to 3,500 psi
8. Circulate second cement plug. Planned TOC at 6,800' MD.
9. Brush BPV profile. Drift and tag top of cement. Drift for jet cut.
10. CMIT-TxIA. Inflow test. Perform OA integrity tests.
11. Jet cut tubing at -6,500' MD.
12. CMIT-TxIA
13. Set TWC. Install dry hole tree and configure annular valves
Proposed Drilling Operations
1. MIRU Parker272.
2. Test TWC from below to 3,500 psi psi for 5 minutes.
3. Nipple down tree and nipple up BOPE and test to 3,500 psi. (Configured from top to bottom:
13-5/8" annular preventer 4-1/2" x 7" VBRs in the upper cavity, blind/shear rams, mud cross
and 2-7/8" x 5" VBRs in the lower cavity).
a. Test 4-1/2" x 7" VBR's with 5" test joint.
b. Test 2-7/8" x 5" VBR's with a 4" and 5" test joints.
c. Test annular to 250 psi / 3,500 psi with 2-7/8" and 5" test joint.
d. Notify AOGCC 24 hrs in advance of full test.
4. Rig up lubricator and pressure test.
5. Pull TWC with pressure tested lubricator.
6. RU hard lines to BOP. Circulate out diesel freeze protection and displace well to clean
seawater.
7. Pull 4-112" tubing from the pre -rig cut.
8. Perform 9-5/8" cleanout run to tubing stub. Perform only if deemed necessary.
9. PU 9-5/8" whipstock, bottom trip anchor, and 8-1/2" window milling assembly (to include full
gauge string mills). RIH to top of tubing stub, orient, and set whipstock. TOWS at 6,433' MD.
10. Swap wellbore over to LSND milling fluid.
--------------------- End of Sundry - Beginning of Permit to Drill ------------------
Drill 8-1/2" x 9-7/8" Intermediate HoleTbbkick
11. Mill window in 9-5/8" casing plus 20' of new formation.
12. Pull into the window and perform LOT. Minimum LOT required is 12.1 ppg EMW for 2 /
tolerance.
13. POOH for drilling BHA.
14. MU 8-1/2" drilling motor BHA w/ MWD/GR/RES/PWD and RIH.
15. Kick off and drill 8-1/2" intermediate interval until set up for underreamer assembly.
16. POOH and lay down motor assembly.
17. Pick up BHA #2, underreamer assembly w/ MWD/GR/RES/PWD and drill to the directional plan to
TSAG, TD of -10,636' MD.
11-23B PTD 8 3/12/2018
18. At TD, CBU a minimum of 2x, or until wellbore is clean.
19. POOH on elevators and lay down BHA.
Run & Cement 7" Intermediate Liner
20. Run 7", 26# L-80, VamTop HC liner to TD, with 150' liner lap into 9-5/8" window. Ch d C'rw r" f
21. Cement liner with 15.8 ppg Class G tail cement to bring cement 1,500' MD above TSAG. J 6 / i'S!// t51-- , J
22. Set liner top packer and liner hanger. POOH and LD liner running tool. to I -r,& C C
23. Change upper 4-1/2" x 7" casing rams to 2-7/8" x 5" VBRs and test to 250 psi low / 3,500 psi high
for 5 min each.
24. Test 7" liner to 250 psi low for 5 min / 3,500 psi high for 30 min after cement has reached a
minimum 500 psi compressive strength.
Drill 6-1/8" Production Hole Section
25. MU 6-1/8" drilling BHA with MWD/GR/RES/DEN/NEU and RIH.
26. RIH and tag landing collar.
27. Displace wellbore to 8.6 ppg QuikDril-N.
28. Perform an extended flow check on 7" liner (no flow test).
29. Drill shoe track and 20 ft of new formation. Pull above shoe and perform FIT. Minimum FIT
required is 9.6 ppg EMW for infinite kick tolerance. However, a higher EMW will be targeted
based on planned ECD's.
30. Drill 6-1/8" production interval per the directional plan to TD of -15,252' MD.
31. At TD, CBU until wellbore is clean.
32. Perform short trip to the shoe if deemed necessary.
33. RIH to TD, circulate the wellbore clean and POOH on elevators.
34. LD excess 4" DP and BHA.
Run and cement 4-1/2" Production Liner
35. Run 4-1/2", 12.6 ppf, 13Cr-85, VamTop production liner to TD, with 150 ft liner lap into 7" casing.
36. Cement production liner with 15.8 Class G cement. Note: If losses are present then the 8.6 ppg
lightweight slurry will be utilized.
37. Set liner hanger and liner top packer (WFT). Circulate out the excess cement off the top of liner.
38. Displace wellbore to clean seawater.
39. POOH and LD liner running tool.
40. Pressure test 9-5/8" casing x 7" liner x 4-1/2" liner envelop to 250 psi low for 5 min / 3,500 psi high
for 30 min. Wait for cement to reach 500 psi prior to conducting pressure test.
41. RU and run perf guns as per TCP. Space out and shoot -2,200' of perforations.
42. POOH while keeping the hole full of sea water
Run 4-1/2" Completion
43. RU and run 4-1/2", 12.6# 13Cr-85 VamTop completion per the tally. Tag up in PBR, space out,
and land tubing hanger. RILDS.
44. Displace tubing and IA to clean seawater.
45. Reverse circulate in heated seawater and inhibited seawater to IA and tubing (surface to surface).
46. Drop ball & rod and set production packer. Individually test tubing and IA to 250 psi low for 5 min /
3,500 psi high for 30 min.
11-23B PTD 9 3/12/2018
47. Hold pressure on the IA and slowly bleed tubing pressure down to 1,500 psi to shear the DCR
valve. Pump both ways to confirm circulation ability.
48. Reverse circulate in diesel freeze protect down IA using rig's injection pump to freeze protect IA
and tubing to 200' below base permafrost.
49. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm
well is dead.
ND/NU
50. Install TWC and test from above and below to 250 psi low / 3,500 psi high for 5 minutes each.
51. N/D BOPE. NU adapter flange and double master valves. Test to 250 psi / 4,500 psi for 5 minutes
each with diesel.
52. Ensure Heat is left on top of TWC and only diesel is left in the tree.
53. Install all annulus valves and secure the well.
54. Rig down Parker 272.
55. Move rig off location.
Post -Rig Operations
1. V: tree work/Pull TWC
2. SL: Pull B&R, Set DGLVs
3. C: Set downhole choke
4. T: Flowback
11-23B PTD 10 3/12/2018
11-23B Drilling Critical Issues
POST THIS NOTICE IN THE DOGHOUSE
I. Well Control / Reservoir Pressures
A. Intermediate Hole: The UG4 is expected to be a 9.5 ppg EMW. The CMI, CM2 and CM3 are
expected to be 9.7 — 10.0 ppg EMW. Formation pressures will be controlled with a 9.8 — 10.3 ppg
mud to drill to within 200' MD of the CM1. At this point, there will be a weight up to 10.3 — 11.0 ppg
to drill the rest of the interval to TD.
B. Production Hole: The Ivishak is expected to be at a 7.6 ppg EMW. Reservoir pressures will be
controlled by using 8.5 — 9.0 ppg water based mud.
II. Lost Circulation/Breathing
A. Intermediate Hole: There are no expected fault crossings in the first intermediate hole. However,
breathing has been known to occur in the Colville on other Drill Sites in Prudhoe Bay as a result of
high ECD's.
B. Production Hole: There are no planned fault crossing in the production interval so the lost circulation
risk is low.
III. Fault Locations
There are no planned fault crossings.
IV. Integrity Testing
Test Point Test De th Testtype EMW Ib! al
9-5/8" Window 20'-50' from the 9-5/8" window LOT 12.1 ppg
7° shoe I 20'-50' from the 7" shoe FIT 9.6 ppg
V. Hydrogen Sulfide
DS -11 is considered an H2S site. Recent H2S data from the pad is as follows:
VI. Anti -Collision Issues
All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan
criteria:
• L2 -08A: Shut-in at surface prior to drilling production interval
• 11-30A: Shut-in at surface with tubing tail plug prior to milling the window
CONSULT THE DS -11 DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION.
11-23B PTD 11 3/12/2018
Well Name
H2S Level
Date of Reading
#1 Closest SHL Well H2S Level
11-23A
24
03/28/2013
#2 Closest SHL Well F12S Level
11-09A
10
05/01/2017
#1 Closest BHL Well H2S Level
11-30A
7
01/08/2017
#2 Closest BHL Well H2S Level
11-27
15
02/19/2017
#3 Closest BHL Well H2S Level
11-39
10
08/22/2017
#4 Closest BHL Well H2S Level
11-09
10
05/01/2017
Max Recorded H2S on Pad/Facility
1 03-29
650
02/10/2016
VI. Anti -Collision Issues
All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan
criteria:
• L2 -08A: Shut-in at surface prior to drilling production interval
• 11-30A: Shut-in at surface with tubing tail plug prior to milling the window
CONSULT THE DS -11 DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION.
11-23B PTD 11 3/12/2018
� e by
North America - ALASKA - BP
Prudhoe Bay
PB DS 11
11-23
PLAN 11-23B
Pian: 11-23B WP08
BP Well Plan Survey Report
15 February, 2018
BAIGIHES
T
1 aGEcompany
s by
Company:
North Americe- ALASKA -BP
Project:
Prudhoe Bay
Site:
PB DS 11
Well:
11-23
Wellbore:
PLAN 11-23B
Design:
11-23B WPOB
BP
BAT
BA,
�(ER
BP Well Plan Survey Report
Northing:
From:
GEmmp ny
Local Co-ordinate Reference:
Well 11-23
TVD Reference:
11-23B Plan RKB @ 74.15usft (11-23B Plan RKB)
MD Reference:
11-23B Plan RKB @ 74.15usft (11-23B Plan RKB)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Project Prudhoe Bay, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK (4267'15864) Using Well Reference Point
Map Zone: NAD27 ° OGP-Usa AK /Alaska zone 4 [26734.1586, Using geodeec scale factor
Site
PB DS 11, TR -11-15
Site Position:
Northing:
From:
Map
Earning:
Position Uncertainty:
0.00 usft
Slot Radius:
Well
11-23
Well Position
-NI-S 0.00 usft
Northing:
+EI -W 0.00 usft
Easting:
Position Uncertainty
0.00 usft
Wellhead Elevation:
Wellbore
PLAN 11-23B
Magnetics
Model Name Sample Date
Declination
1°)
BGGM2017 5/1/2018
17.46
Design 11-238 WP08
Audit Notes:
Version:
Vertical Section:
5,949,527.780 usft Latitude: 70° 15' 55.850 N
707,585.650 usft Longitude: 148° 19' 17.134 W
0.000 in Grid Convergence: 1.58 °
5,952,810.850 usft • Latitude: 70° 16'28.245 N
707,155.970 usft Longitude: 148° 19'27.005 W
28.45 usft Ground Level: ° 27.20usft
Dip Angle Field Strength
1°I (nT)
80.98 57,473
I
Phase: PLAN Tie On Depth: 6,114.15
Depth From (TVD) -NI-S +E/ -W Direction
(usft) (usft) (usft) (°)
45.70 0.00 0.00 337.64
2/152018 11:40:02AM Page 2 COMPASS 5000.1 Build 81D
BP ,
ER
kw �� BP Well Plan Survey Report BAF�UGHES GE Q�pany
Company: North America - ALASKA - BP
Well 11-23
TVD Reference:
Project: Prudhoe Bay
MD Reference:
11-23B Plan RKB @ 74.15usft (11-23B Plan RKB)
Site: PB DS 11
True
Survey Calculation Method:
Well: 11-23
Database:
EDM RSK - Alaska PROD - ANCP1
Wellbore: PLAN 11-23B
r)
3,22049
Design: 11-23B WP08
5,956,001.584
706,037.089
Survey Tool Program Date 2/15/2018
0.00
0.00
From To
-1,141.46
5,956,246.967
(usft) Will Survey (Wellbore)
Tool Name
117.15 598.15 Sperry Boss Gyro MS WRP 57.0' Copy (11
BOSS -GYRO
598.15 6,114.15 MWD (11-23)
5,956,258.542
MWD
6,114.15 6,450.00 11-23B WP08 (PLAN 11-23B)
12.50
MWD
6,450.00 6,880.00 11-23B WPO8 (PLAN 11-23B)
3,495.29
BLIND
6,880.00 10,636.00 11-23B WPOB (PLAN 11-23B)
-
MWD
6,880.00 10,636.00 11-23B WP08 (PLAN 11-23B)
0.00
MWD+IFR+MS-WOCA
10,636.00 15,252.34 11-23B WP08 (PLAN 11-23B)
-1159,94
MWD
10,638.00 15,252.34 11-238 WP08 (PLAN 11-23B)
MWD+IFR+MS-WOCA
Planned Survey
3,575.91
-1,19719
MD Inc Azi
TVD
TVDSS
lush) V) (1)
hush)
(usft)
6,114.15 53.50 336.80
4708.89
4,634.74
TIP
3.00
6,450.00 54.75 335.16
4,905.71
4,831.56
KOP
5,956,464.873
705,793.190
6,466.00 54.77 332.71
4,914.94
4,840.79
Start 20.00 hold at 6466.00 MD
6,486.00 54.77 332.71
4,926.48
4,852.33
Start DLS 3.00 TFO -184.77
6,500.00 54.37 332.58
4,934.59
4,860.44
6,600.00 51.48 331.56
4,994.87
4,920.72
6,700.00 48.60 330.47
5,059.09
4,984.94
6,774.15 46.47 329.59
5,109.15
5,035.00
UG3
Local Co-ordinate Reference:
Well 11-23
TVD Reference:
11-23B Plan RKB @ 74.15usft (11-23B Plan RKB)
MD Reference:
11-23B Plan RKB @ 74.15usft (11-23B Plan RKB)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM RSK - Alaska PROD - ANCP1
Description
Sperry -Sun BOSS gyro multishot
MWD - Standard
MWD - Standard
Blind drilling
MWD - Standard
MWD + IFR + Multi Station W/O Crustal
MWD - Standard
MWD + IFR + Multi Station W/O Crustal
NIS
EIW
Northing
Easting
DLeg
TFace
(usft)
(usft)
(usft)
(usft)
(°/100usft)
r)
3,22049
-1,030.67
5,956,001.584
706,037.089
0.00
0.00
3,489.03
-1,141.46
5,956,246.967
705,919.499
0.54
-46.30
3,480.77
-1,147.20
5,956,258.542
705,913.437
12.50
-90.00
3,495.29
-1,154.69
5,956,272.849
705,905.551
0.00
0.00
3,505.42
-1159,94
5,956,282.832
705,900.032
3.00
-164.77
3,575.91
-1,19719
5,956,352.262
705,860.753
3.00
-164.70
3,642.96
-1,234A1
5,956,418.259
705,821.801
3.00
-164.09
3,690.34
-126173
5,956,464.873
705,793.190
3.00
-163.38
2/752018 11:40:02AM Page 3 COMPASS 50001 Build 81D
by BP BATHER ;
BP Well Plan Survey Report UGI�ES
ce°omnaw
Company: North America - ALASKA - BP
Pro)ect Prudhoe Bay
Site: PB DS 11
Well: 11-23
Reference:
Wellbore PLAN 11-238
Design: 11-236 WP08
Planned Survey
MD Inc
(usft)
6,800.00
45.73
6,900.00
42.88
7,000.00
40.04
7,100.00
37.22
7,200.00
34.43
7,255.00
32.91
Start 2966.16 hold at 7266.00 MD
7,300.00
32.91
7,400.00
32.91
7,500.00
32.91
7,600.00
32.91
7,654.77
32.91
UGI
7,700.00
32.91
7,800.00
32.91
7,900.00
32.91
8,000.00
32.91
8,100.00
32.91
8,200.00
32.91
8,292.03
32.91
WS2
8,300.00
32.91
8,400.00
32.91
8,500.00
32.91
8,600.00
32.91
8,700.00
32.91
211512018 11:40.02AM Page 4 COMPASS 5000.1 Build 81D
Local Co-ordinate
Reference:
Well 11-23
TVD Reference:
11-23B Plan RKB @ 74.15usft (11-23B
Plan RKB)
MD Reference:
11-23B Plan RKB Ca? 74.15usft (11-23B
Plan RKB)
North Reference:
True
Survey Calculation
Method:
Minimum Curvature
Database:
EDM R5K-Alaska
PROD -ANCP1
Azi
TVD
TVDSS
NIS
EIW
Northing
Easting
DLe9
TFace
(°)
(usft(
(usft)
(usft)
(usft)
(usft)
(usft)
(°/IOOusft)
(°(
329.27
5,127.07
5,052.92
3,706.38
-1,271.20
5,956,480.643
705,783.280
3.00
-162.79
327.95
5,198.63
5,124.46
3,766.01
-1,307.56
5,956,539.242
705,745.297
3.00
-162.57
326.48
5,273.57
5,199.42
3,821.57
-1,343.39
5,956,593.896
705,707.955
3.00
-161.62
324.83
5,351.68
5,277.53
3,873.22
-1,378.58
5,956,644.455
705,671.358
3.00
-160.52
322.95
5,432.76
5,358.61
3,920.52
-1,413.04
5,956,690.781
705,635.606
3.00
-159.23
321.79
5,478.53
5,404.38
3,944.67
-1,431.66
5,956,714.410
705,616.336
3.00
-157.70
321.79
5,516.31
5,442.16
3,963.88
-1,446.78
5,956,733.196
705,600.693
0.00
0.00
321.79
5,600.26
5,526.11
4,006.57
-1,480.38
5,956,774.945
705,565.929
0.00
0.00
321.79
5,684.22
5,610.07
4,049.26
-1,513.98
5,956,816.694
705,531.165
0.00
0.00
321.79
5,768.17
5,694.02
4,091.96
-1,547.59
5,956,858.442
705,496.400
0.00
0.00
321.79
5,614.15
5,740.00
4,115.34
-1,565.99
5,956,881.307
705,477.361
0.00
0.00
321.79
5,852.12
5,777.97
4,134.65
-1,581.19
5,956,900.191
705,461.636
0.00
0.00
321.79
5,936.08
5,861.93
4,177.34
-1,614.80
5,956,941.940
705,426.871
0.00
0.00
321.79
6,020.03
5,945.88
4,220.03
-1,648.40
5,956,983.689
705,392.107
0.00
0.00
321.79
6,103.98
6,029.83
4,262.73
-1,682.00
5,957,025.438
705,357.343
0.00
0.00
321.79
6,187.94
6,113.79
4,305.42
-1,715.61
5,957,067.186
705,322.578
0.00
0.00
321.79
6,271.89
6,197.74
4,348.11
-1,749.21
5,957,108.935
705,287.814
0.00
0.00
321.79
6,349.15
6,275.00
4,387.40
-1,780.13
5,957,147.355
705,255.822
0.00
0.00
321.79
6,355.84
6,281.69
4,390.80
-1,782.81
5,957,150.684
705,253.049
0.00
0.00
321.79
6,439.80
6,365.65
4,433.49
-1,816.42
5,957,192.433
705,218.285
0.00
0.00
321.79
6,523.75
6,449.60
4,476.19
-1,1150.02
5,957,234.181
705,183.521
0.00
0.00
321.79
6,607.70
6,533.55
4,518.88
-1,883.62
5,957,275.930
705,148.756
0.00
goo
321.79
6,691.66
6,617.51
4,561.57
-1,917.23
5,957,317.679
705,113.992
0.00
0.00
211512018 11:40.02AM Page 4 COMPASS 5000.1 Build 81D
BP BA�UG
bp BP Well Plan Survey Report (ER
E,. p,,
Company: North America -ALASKA - BP
Project Prudhoe Bay
SRO: PB DS 11
Well: 11-23
Wellbore: PLAN 11-23B
Design: 11-23B WPO8
Planned Survey
MD Inc
(usft) (°)
8,798.26 32.91
CM3
8,800.00 32.91
8,900.00 32.91
9,000.00 32.91
9,100.00 32.91
9,200.00 32.91
9,300.00 32.91
9,334.27 32.91
CM2
9,400.00 32.91
9,500.00 32.91
9,600.00 32.91
9,700.00 32.91
9,800.00 32.91
9,900.00 32.91
9,969.15 32.91
CM1
10,000.00 32.91
10,100.00 32.91
10,200.00 32.91
10,221.16 32.91
Start OLS 3.00 TFO 122.54
10,300.00 31.69
10,385.67 30.50
Start 250.00 hold at 10385.67 MD
10,39775 30.50
THRZ
321.79
7,783.05
7,708.90
5,116.57
Local Coordinate Reference:
Well 11-23
704,662.055
0.00
0.00
321.79
7,867.01
7,792.86
TVD Reference:
-2,387.68
11-23B Plan RKB @
74.15usft (11-23B Plan RKB)
0.00
0.00
321.79
7,950.96
7,876.81
MD Reference:
-2,421.28
11-23B Plan RKB @
74.15usft (11-23B Plan RKB)
0.00
0.00
321.79
7,968.72
7,894.57
North Reference:
-2,428.39
True
704,585.169
0.00
0.00
325.59
8,035.37
7,961.22
Survey Calculation Method:
Minimum Curvature
5,957,985.961
704,559.293
3.00
122.64
330.00
8,106.74
Database:
5,282.30
EDM R5K-Alaska PROD - ANCPi
5,958,022.694
Azi
TVo
TVDSS
NIS
EMI
Northing
Easting
DLeg TFace
5,958,027.917
0
(usft)
(usft)
(usft)
(usft)
(usft)
(usft(
('1100usft) 1°I
321.79
6,774.15
6,700.00
4,603.52
.1,950.25
5,957,358.701
705,079.833
0.00
0.00
321.79
6,775.61
6,701.46
4,604.26
-1,950.83
5,957,359.428
705,079.227
0.00
0.00'
321.79
6,859.56
6,785.41
4,646.96
-1,984.43
5,957,401.177
705,044.463
0.00
0.00
321.79
6,943.52
6,869.37
4,689.65
-2,018.04
5,957,442.925
705,009.699
0.00
0.00
321.79
7,027.47
6,953.32
4,732.34
-2,051.64
5,957,484.674
704,974.934
0.00
0.00
321.79
7,111.43
7,037.28
4,775.03
-2,085.25
5,957,526.423
704,940.170
0.00
0.00
321.79
7,195.38
7,121.23
4,817.72
-2,118.85
5,957,568.172
704,905.405
0.00
0.00
321.79
7,224.15
7,150.00
4,832.36
-2,130.37
5,957,582.479
704,893.491
0.00
0.00
321.79
7,279.33
7,205.18
4,860.42
-2,152.45
5,957,609.920
704,870.641
0.00
0.00
321.79
7,363.29
7,289.14
4,903.11
-2,186.06
5,957,651.669
704,835.877
0.00
0.00
321.79
7,447.24
7,373.09
4,945.80
-2,219.66
5,957,693.418
704,801.112
0.00
0.00
321.79
7,531.19
7,457.04
4,988.49
-2,253.26
5,957,735.167
704,766.348
0.00
0.00
321.79
7,615.15
7,541.00
5,031.19
-2,286.87
5,957,776.916
704,731.583
0.00
0.00
321.79
7,699.10
7,624.95
5,073.88
-2,320.47
5,957,818.664
704,696.819
0.00
0.00'
321.79
7,757.15
7,683.00
5,103.40
-2,343.71
5,957,847.532
704,672.780
0.00
0.00
321.79
7,783.05
7,708.90
5,116.57
-2,354.07
5,957,860413
704,662.055
0.00
0.00
321.79
7,867.01
7,792.86
5,159.26
-2,387.68
5,957,902.162
704,627.290
0.00
0.00
321.79
7,950.96
7,876.81
5,201.95
-2,421.28
5,957,943.911
704,592.526
0.00
0.00
321.79
7,968.72
7,894.57
5,210.99
-2,428.39
5,957,952.745
704,585.169
0.00
0.00
325.59
8,035.37
7,961.22
5,244.91
-2,453.35
5,957,985.961
704,559.293
3.00
122.64
330.00
8,106.74
8,034.59
5,282.30
-2,476.94
5,958,022.694
704,534.682
3.00
11943
330.00
8,119.15
8,045.00
5,287.61
-2,480.00
5,958,027.917
704,531.472
0.00
0.00
21152018 11:40:02AM Page 5 COMPASS 5000.1 Build 81D
BP
BAKER
ER
(UGHES
bp
BP Well
Plan Survey Report
GEcompany
Company: North America
- ALASKA -BP
Local Co-ordinate Reference:
Well 11-23
Project: Prudhoe Bay
TVD Reference:
11-23B Plan RKB Q? 74.15usft (11-23B Plan RKB)
Site: PB DS 11
MD Reference:
11-23B Plan RKB @ 74.15usft (11-23B Plan RKB)
Well: 11-23
North Reference:
True
Wellbore: PLAN 11-23B
Survey Calculation Method:
Minimum Curvature
Design: 11-23B WPO8
Database:
EDM R5K - Alaska PROD - ANCP1
Planned Survey
MD Inc
Azi
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg TPace
(usR) (1
(1)
(usft)
(usR(
(usft)
(usR)
(usR)
(usft)
(°1100usft) (`)
10,400.00
30.50
330.00
8,121.09
8,046.94
5,288.60
-2,480.57
5,958,028.888
704,530874
000
0.00
10,500.00
30.50
330.00
8,207.25
8,133.10
5,332.56
-2,505.95
5,958,072.125
704,504.298
0.00
0.00
10,600.00
30.50
330.00
8,293.41
8,21926
5,376.51
-2,531.33
5,958,115.362
704,477.722
0.00
0.00
10,634.51
30.50
330.00
8,323.15
8,249.00
5,391.68
-2,540.09
5,958,130.264
704,468.550
0.00
0.00
LCWTSHC
10,635.67
30.50
330.00
8,324.15
8,250.00
5,392.19
-2,540.38
5,958,130.786
704,468.242
0.00
0.00
Start 200.00 hold at 10635.67 MD
10,653.08
30.50
330.00
8,339.15
8,265.00
5,399.84
-2,544.80
5,958,138.313
704,463.615
0.00
0.00
TSAD
10,700.00
30.50
330.00
8,379,58
8,305.43
5,420.46
-2,55870
5,958,158.598
704,451.146
0.00
0.00
10,728.52
30.50
330.00
8,404.15
8,330.00
5,433.00
-2,563.94
5,958,170.930
704,443.566
0.00
0.00
42N
10,735.48
30.50
330.00
8,410.15
8,336.00
5,436.06
-2,565.71
5,958,173.941
704,441.716
0.00
0.00
42P
10,800.00
30.50
330.00
8,465.74
8,391.59
5,464.42
-2,582.08
5,958,201.835
704,424.570
0.00
0.001
10,809.76
30.50
330.00
8,474.15
8,400.00
5,468.71
-2,564.56
5,958,206.056
704,421.976
0.00
0.00
TCGL
1 10,835.67
30.50
330.00
8,496.48
8,422.33
5,480.10
-2,591.13
5,958,217.259
704,415.090
0.00
0.00
Start Build 10.00
10,838.78
30.81
330.00
8,499.15
8,425.00
5,481.47
-2,591.93
5,958,218.609
704,414.260
10.00
0.00
GWC
10,862.37
33.17
330.00
8,519.15
8,445.00
5,492.29
-2,598.17
5,958,229.252
704,407.718
10.00
0.00
BCGL
10,900.00
36.93
330.00
8,549.95
8,475.80
5,511.00
-2,608.98
5,958,247.661
704,396.403
10.00
0.00
10,964.40
43.37
330.00
8,599.15
8,525.00
5,546.95
-2,629.73
5,958,283.018
704,374.670
10.00
0.00
24N
10,975.51
44.48
330.00
8,607.15
8,533.00
5,553.62
-2,633.58
5,958,289.582
704,370.635
10.00
0.00
24P
11,000.00
46.93
330.00
8,624.25
8,550.10
5,568.80
-2,642.35
5,958,304.516
704,361.455
10.00
0.00
2/152018 11 r40:02AM
Page 6
COMPASS 5000.1 Build 810
by BP Well PlBP an Survey Report B F�UGHES
r i,wy
Company: North America -ALASKA - BP
Project. Prudhoe Bay
Site: PB DS 11
Well: 11-23
Wellbore: PLAN 11-23B
Design: 11-23B WP08
Planned Survey
MD Inc
(usft) )°)
11,011.69 48.10
23N
11,045.79 51.51
22N
11,070.57 53.99
22P
11,100.00 56.93
11,167.28 63.66
PGOC - 7000
11,200.00 66.93
11,246.06 71.54
TDF
11,300.00 76.93
11,400.00 86.93
11,430.67 90.00
Start 500.00 hold at 11430.67 MD
11,500.00 90.00
11,600.00 90.00
11,700.00 90.00
11,800.00 90.00
11,900.00 90.00
11,930.67 90.00
Shit DLS 2.00 TFO 40.00
12,000.00 91.06
12,03087 91.53
Start 400.00 hold at 12030.67 MD
12,100.00 91.53
12,200.00 91.53
211512018 11:40:02AM Page 7 COMPASS 5000.1 Build 81D
Local Co-ordinate Reference:
Well 11-23
TVD Reference:
11-23B Plan RKB @ 74.15usft (11-23B Plan RKB)
MD Reference:
11-23B Plan RKB @
74.15usft (11-23B Plan RKB)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Azi
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg TFace
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usf) (°)
330.00
8,632.15
8,558.00
5,576.27
-2,646.66
5,958,311.863
704,356.940
10.00
0.00
330.00
8,654.15
8,580.00
5,598.82
-2,659.68
5,958,334.046
704,343.305
10.00
0.00
330.00
8,669.15
8,595.00
5,615.91
-2,669.54
5,958,350.850
704,332.976
10.00
0.00
330.00
8,685.83
8,611.68
5,636.90
-2,681.66
5,958,371.499
704,320.283
10.00
0.00
330.00
8,719.15
8,645.00
5,687.48
.2,710.86
5,958,421.251
704,289.703
10.00
0.00
330.00
8,732.82
8,658.87
5,713.22
.2,725.73
5,958,446.574
704,274.138
10.00
0.00
330.00
8,749.15
8,675.00
5,750.51
-2,747.26
5,958,483.255
704,251.591
10.00
0.00
330.00
8,763.80
8,689.65
5,795.45
-2,773.20
5,958,527.460
704,224.420
10.00
0.00
330.00
8,777.81
8,703.66
5,881.08
-2,822.64
5,958,611.699
704,172.641
10.00
0.00
330.00
8,778.64
8,704.49
5,907.64
-2,837.97
5,958,637.817
704,156.587
10.00
0.00
330.00
8,778.64
8,704.49
5,967.67
-2,872.64
5,958,696.875
704,120.287
0.00
0.00 --
330.00
8,778.64
8,704.49
6,054.28
-2,922.64
5,958,782.064
704,067.924
0.00
0.00
330.00
8,778.64
8,704.49
6,140.88
-2,972.64
5,958,867.253
704,015.561
0.00
0.00
330.00
8,778.64
8,704.49
6,227.48
-3,022.64
5,958,952.441
703,963.199
0.00
0.00
330.00
8,778.64
8,704.49
6,314.08
-3,072.64
5,959,037.630
703,910.836
0.00
0.00
330.00
8,778.64
8,704.49
6,340.65
-3,087.97
5,959,063.761
703,894.775
0.00
0.00
330.89
8,777.99
8,703.84
6,400.95
-3,122.17
5,959,123.096
703,858.937
2.00
40.001
331.29
8,777.30
8,703.15
6,427.79
-3,136.99
5,959,149.520
703,843.378
2.00
40.01
331.29
8,775.45
8,701.30
6,488.57
-3,170.29
5,959,209.356
703,808.424
0.00
0.00
331.29
8,772.77
8,698.62
6,576.24
-3,218.31
5,959,295.668
703,758.005
0.00
0.001
211512018 11:40:02AM Page 7 COMPASS 5000.1 Build 81D
Lip BP BAT ICER �
p BP Well Plan Survey Report uGHES
a GE company
Company:
North America -ALASKA - BP
Project:
Prudhoe Bay
Site:
PB DS 11
Well:
11-23
Wellbore:
PLAN 11-23B
Design:
11-23B WP08
Planned Survey
MD Inc
Well 11-23
(usft) (°)
11-238 Plan RKB Q 74.15usft (11-238 Plan RKB)
12.300.00
91.53
12,400.00
91.53
12,430.67
91.53
Start Drop -2.00
EDM R5K-Alaska PROD -ANCP1
12,482,27
90.50
Start 350.00 hold at 12482.27 MD
12,500.00
90.50
12,600.00
90.50
12,700.00
90.50
12,800.00
90.50
12,832.27
90.50
Start Build 2.00
5,959,381.979
12,882.27
91.50
Start 400.00 hold at 12882.27 MD
12,900.00
91.50
13,000.00
91.50
13,100.00
91.50
13,200.00
91.50
13,282.27
91.50
Start DLS 3.00 TFO 80.00
13,300.00
91.59
13,400.00
92.11
13,500.00
92.62
13,600.00
93.13
13,632.27
93.29
Start DLS 3.00 TFC) 91.00
8,691.54
13,700.00
93.25
13,800.00
93.19
Local Co-ordinate Reference:
Well 11-23
TVD Reference:
11-238 Plan RKB Q 74.15usft (11-238 Plan RKB)
MD Reference:
11-23B Plan RKB Q 74.15usft (11-238 Plan RKB)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K-Alaska PROD -ANCP1
Azl
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
TFace
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(°)
331.29
8,770.10
8,695.95
6,663.92
-3,266.34
5,959,381.979
703,707.585
0.00
0.00
331.29
8,767.42
8,693.27
6,751.59
-3,314.37
5,959,468.291
703,657.166
0.00
0.00
331.29
8,766.60
8,692.45
6,778.48
-3,329.10
5,959,494.766
703,641.700
0.00
0.00
331.29
8,765.69
8,691.54
6,823.72
-3,353.88
5,959,539.310
703,615.879
2.00
180.00
331.29
8,765.54
8,691.39
6,839.27
-3,362.40
5,959,554.616
703,606.738
0.00
0.00
331.29
8,764.66
8,690.51
6,926.97
-3,410.44
5,959,640.955
703,558.302
0.00
0.00
331.29
8,763.79
8,689.64
7,014.67
-3,458.48
5,959,727.294
703,505.867
0.00
0.00
331.29
8,762.92
8,688.77
7,102.37
-3,506.53
5,959,813.633
703,455.431
0.00
0.00
331.29
8,762.64
8,688.49
7,130.67
-3,522.03
5,959,841.497
703,439.154
0.00
0.00
331.29
8,761.76
8,687.61
7,174.52
-3,546.05
5,959,884.661
703,413.940
2.00
0.00.
331.29
8,761.30
6,687.15
7,190.06
-3,554.56
5,959,899.962
703,405.001
0.00
0.001
331.29
8,758.68
8,684.53
7,277.73
-3,602.59
5,959,986.275
703,354.581
0.00
0.00
331.29
8,756.06
8,681.91
7,365.40
-3,650.62
5,960,072.588
703,304.160
0.00
0.00
331.29
8,753.45
8,679.30
7,453.08
-3,698.65
5,960,158.901
703,253.740
0.00
0.00
331.29
8,751.29
8,677.14
7,525.21
-3,738.16
5,960,229.912
703,212.258
0.00
0.00
331.81
8,750.81
8,676.66
7,540.79
-3,746.60
5,960,245.254
703,203.390
3.00
80.00
334.77
8,747.58
8,673.43
7,630.06
-3,791.52
5,960,333.250
703,156.030
3.00
80.01
337.72
8,743.45
8,669.30
7,721.50
-3,831.77
5,960,423.542
703,113.286
3.00
80.11
340.69
8,738.44
8,664.29
7,814.86
-3,867.22
5,960,515.883
703,075.278
3.00
80.23
341.64
8,736.63
8,662.48
7,845.35
-3,877.62
5,960,546.079
703,064.040
3.00
80.38
343.68
8,732.77
8,658.62
7,909.89
-3,897.78
5,960,610.037
703,042.119
3.00
91.00 ISI
346.68
8,727.15
8,653.00
8,006.40
-3,923.31
5,960,705.802
703,013.936
3.00
91.12
217&2018 11:40:02AM Page 8 COMPASS 5000.1 Build 81D
Company: North America -ALASKA - BP
Project: Prudhoe Bay
8,575.00
Site: PB DS 11
Local Co-ordinate
Well: 11-23
Well 11-23
Wellbore: PLAN 11-23B
0.00
Design: 11-238 WP08
8,635.82
Planned Survey
9,391.51
MD Inc
5,962,091.234
(usft) (°)
Plan RKB)
13,900.00
93.12
14,000.00
93.04
14,100.00
92.95
14,200.00
92.85
14,300.00
92.75
14,400.00
92.84
14,432.27
92.60
Start DLS 2.00 TFO 180.00
14,500.00
91.24
14,512.16
91.00
Start 430.00 hold at 14512.16
MD
14,600.00
91.00
14,700.00
91.00
14,800.00
91.00
14,900.00
91.00
14,942.16
91.00
Start DLS 8.00 TFO 0.00
PROD - ANCP1
15,000.00
95.63
15,100.00
103.63
15,111.00
104.51
TDF (too up)
Fasting
15,157.00
108.19
PGOC (toe up)
(wily
15,157.34
108.21
Start 96.00 hold at 15157.34 MD
15,200.00
108.21
15,252.34
108.21
TD at 15252.34
8,721.65
BP
BP Well Plan Survey Report
r
B kUGHES
GEcompany
5.66 8,649.26 8,575.11 9,350.87 -3,894.10 5,962,050.495 703,006.124 8.00 0.00
5.66
8,649.15
8,575.00
9,351.19
Local Co-ordinate
Reference:
Well 11-23
8.00
0.00
5.66
8,635.82
8,561.67
9,391.51
TVD Reference:
5,962,091.234
11-23B Plan RKB @ 74.15usft (11-23B
Plan RKB)
0.00
5.66
8,619.46
8,545.31
MD Reference:
-3,885.16
11-23B Plan RKB Q 74.15usft (11-23B
Plan RKB)
0.00
0.00
North Reference:
True
Survey Calculation
Method:
Minimum Curvature
Database:
EDM R5K - Alaska
PROD - ANCP1
Ari
TVD
TVDSS
NIS
E/W
Northing
Fasting
DLeg
TFace
(°)
(wily
(usft)
(usft)
(usft)
(usR)
(usft)
1,1100usft)
(°)
34968
8,721.65
8,647.50
8,104.12
-3,943.76
5,960,802.918
702,990.809
3.00
91.28
352.69
8,716.28
8,642.13
8,202.79
-3,959.06
51960,901.120
702,972.801
3.00
91.45
355.69
8,711.06
8,636.91
8,302.13
-3,969.17
5,961,000.138
702,959.961
3.00
91.61
358.69
8,706.00
8,631.85
8,401.87
-3,974.06
5,961,099.701
702,952.324
3.00
91.77
1.69
8,701.11
8,626.96
8,501.74
-3,973.72
5,961,199.536
702,949.913
3.00
91.92
4.70
8,696.41
8,622.26
8,601.46
-3,968.16
5,961,299,369
702,952.732
3.00
92.07
5.66
8,694.94
8,620.79
8,633.57
-3,965.25
5,961,331.541
702,954.756
3.00
92.21
5.66
8,692.07
8,618.52
8,700.92
-3,958.56
5,961,399.054
702,959.581
2.00
180.00
5.66
8,692.43
8,618.28
8,713.03
-3,957.36
5,961,411.185
702,960.448
2.00
-180.00
5.66
8,690.90
8,616.75
8,800.42
-3,948.70
5,961,498.779
702,966.706
0.00
0.00
566
8,689.15
8,615.00
8,899.92
-3,938.83
5,961,598.505
702,973.831
0.00
0.00
566
8,687.41
8,613.26
8,999.41
-3,928.96
5,961,698.230
702,980.956
0.00
0.001
5.66
8,685.66
6,611.51
9,098.91
-3,919.09
5,961,797.956
702,988.081
0.00
0.00
566
8,684.93
8,610.78
9,140.86
-3,914.93
5,961,840.005
702,991.085
0.00
0.00
5.66
8,681.59
8,607.44
9,198.30
-3,909.23
5,961,897.578
702,995.199
8.00
0.00
5.66
8,664.88
8,590.73
9,296.33
-3,899.51
5,961,995.834
703,002.219
8.00
0.00
566
8,662.20
8,588.05
9,306.95
-3,898.46
5,962,006.476
703,002.979
8.00
0.00
5.66 8,649.26 8,575.11 9,350.87 -3,894.10 5,962,050.495 703,006.124 8.00 0.00
5.66
8,649.15
8,575.00
9,351.19
-3,894.07
5,962,050.821
703,006.147
8.00
0.00
5.66
8,635.82
8,561.67
9,391.51
-3,890.07
5,962,091.234
703,009.035
0.00
0.00
5.66
8,619.46
8,545.31
9,440.99
-3,885.16
5,962,140.827
703,012.578
0.00
0.00
2/15/2018 11:40:02AM Page 9 COMPASS 5000.1 Build 810
up
Well 11-23
TVD Reference:
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
True
Site:
PB DS 11
Database:
Well:
11-23
Wellbore:
PLAN 11-23B
Name (in) (in)
Design:
11-23B WPOS
Casing Points
Measured
Vertical
Depth
Depth
(usft)
(usft)
15,25234
8,619.50 41/2'
10,636.00
8,324.47 7"
BP
BP Well Plan Survey Report
B IUGHES
E WY
Local Co-ordinate Reference:
Well 11-23
TVD Reference:
11-23B Plan RKB Q 74.15usft (11-238 Plan RKB)
MD Reference:
11-23B Plan RKB @ 74.15usft (11-23B Plan RKB)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K-Alaska PROD -ANCP1
Casing Hole
Diameter Diameter
Name (in) (in)
4.500 6.125
7.000 8.500
2/15/2018 11:40:02AM Page 10
COMPASS 5000.1 Build 81D
BP
0 by BP Well Plan Survey Report BA UGHES
Company:
Project:
Site:
Well:
Wellbore:
Design:
Formations
North America - ALASKA - BP
Local Co-ordinate Reference:
Well 11-23
Prudhoe Bay
TVD Reference:
11-23B Plan RKB Q 74.15usfl (11-23B Plan RKB)
PB DS 11
MD Reference:
11-23B Plan RKB @ 74.15us%(11-23B Plan RKB)
11-23
North Reference:
True
PLAN 11-23B
Survey Calculation Method:
Minimum Curvature
11-23B WP08
Database:
EDM R5K - Alaska PROD - ANCP1
Measured
Vertical
Dip
Depth
Depth
Dip Direction
(usR)
(usR)
Name
Lithology (°) P)
10,964.34
8,599.15
24N
10,397.70
8,119.15
THRZ
8,291.98
6,349.15
WS2
7,654.72
5,814.15
UGI
11,245.93
8,749.15
TDF
10,809.72
8,474.15
TCGL
9,969.10
7,757.15
CM1
10,653.04
8,339.15
TSAD
11,167.18
8,719.15
PGOC
10,728.47
8,404.15
42N
10,838.73
8,499.15
GWC
10,975.45
8,607.15
24P
15,111.00
8,662.24
TDF (toe up)
0.00
6,774.09
5,109.15
UG3
8,798.21
6,774.15
CM3
11,045.72
8,654.15
22N
6,440.31
4,900.15
UG4
10,862.32
8,518.15
BCGL
11,167.18
8,719.15
7000
10,735.44
8,410.15
42P
9,334.22
7,224.15
CM2
11,011.63
8,632.15
23N
11,070.50
8,669.15
22P
15,157.00
8,649.30
PGOC (toe up)
0.00
10,634.47
8,323.15
LCUITSHC
2/152018 11:40:02AM Page 11 COMPASS 5000.1 Build BID
BP
by BP Well Plan Survey Report B��f]7HES
IaGE company
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well 11-23
Project:
Prudhoe Bay
TVD Reference:
11-23B Plan RKB @ 74.15usft (11-23B Plan RKB)
Site:
PB DS 11
MD Reference:
11-238 Plan RKB @ 74.15usft (11-23B Plan RKB)
Well:
11-23
North Reference:
True
Wellbore:
PLAN 11-23B
Survey Calculation Method:
Minimum Curvature
Design:
11-23B WP08
Database:
EDM R5K - Alaska PROD - ANCP1
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
-NI-S
+El -W
(usft)
(usft)
(usft)
(usft)
Comment
6,114.15
4,708.89
3,220.49
-1,030.67
TIP
6,450.00
4,905.71
3,469.03
-1,141.46
KOP
6,466.00
4,914.94
3,480.77
-1,147.20
Start 20.00 hold at 6466.00 MD
6,486.00
4,926.48
3,495.29
-1,154.69
Start DLS 3.00 TFO-164.77
7,255.00
5,478.53
3,944.67
-1,431.66
Start 2966.16 hold at 7255.00 MD
10,221.16
7,968.72
5,210.99
-2,428.39
Start DLS 3.00 TFO 122.64
10,385.67
8,108.74
5,282.30
-2,476.94
Start 250.00 hold at 10385.67 MD
10,635.67
8,324.15
5,392.19
-2,540.38
Start 200.00 hold at 10635.67 MD
10,835.67
8,496.48
5,480.10
-2,591.13
Start Build 10.00
11,430.67
8,778.64
5,907.64
-2,837.97
Start 500.00 hold at 11430.67 MD
11,930.67
8,778.64
6,340.65
-3,087.97
Start DLS 2.00 TFO 40.00
1
12,030.67
8,777.30
6,427.79
-3,136.99
Start 400.00 hold at 12030.67 MD
12,430.67
8,766.60
6,778.48
-3,329.10
Start Drop -2.00
12,482.27
8,765.69
6,823.72
-3,353.88
Start 350.00 hold at 12482.27 MD
12,832.27
8,762.64
7,130.67
-3,522.03
Start Build 2.00
12,882.27
8,761.76
7,174.52
-3,546.05
Start 400.00 hold at 12882.27 MD
13,282.27
8,751.29
7,525.21
-3,738.16
Start DLS 3.00 TFO 80.00
13,632.27
8,736.63
7,845.35
-3,877.62
Start DLS 3.00 TFO 91.00
14,432.27
8,694.94
.8,633.57
-3,965.25
Start DLS 2.00 TFO 180.00
14,512.16
8,692.43
8,713.03
-3,957.36
Start 430.00 hold at 14512.16 MD
14,942.16
8,684.93
9,140.86
-3,914.93
Start DLS 8.00 TFO 0.00
15,157.34
8,649.15
9,351.19
-3,894.07
Start 95.00 hold at 15157.34 MD
15,252.34
8,619.46
9,440.99
-3,885.16
TD at 15252.34
Checked By:
Approved By:
Date:
2/1512018 11:40.02AM
Page 12
COMPASS 5000.1 Build BID
North America - ALASKA - BP
Prudhoe Bay
PB DS 11
11-23
PLAN 11-23B
11-23B WP08
Anticollision Summary Report
15 February, 2018
BAT
IGI0
1 aGEcompany
iNzbp
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 11
Site Error:
0.00usft
Reference Well:
11-23
Well Error:
O.00usft
Reference Wellbore
PIAN 11-23B
Reference Design:
11-23B WP08
BP BA ER
Anticollision Report IGHES
.3 rr mmpa�v
Local Co-ordinate Reference:
Well 11-23
TVD Reference:
11-23B Plan IRKS @ 74.15usft (11-2313 Plan RKB)
MD Reference:
11-23B Plan RKB @ 74.15usft (11-23B Plan RKB)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Output errors are at
1.00 sigma
Database:
EDM R5K - Alaska PROD - ANCP1
Offset TVD Reference:
Offset Datum
teference
11-23B WPOB
Centre to
Ttter type:
NO GLOBAL FILTER: Using user defined selection 8 filtering cntena
To
merpolation Method:
MD Inten al 25.00usft Error Model:
ISCWSA
)epth Range:
6,114.15 to 15,252.34usft Scan Method:
Tray. Cylinder North
tesults Limited by:
Maximum center -center distance of 1,720.66usft Error Surface:
Elliptical Conic
Survey Tool Program
Date 2/15/2018
Centre to
No -Go
From
To
Measured
Centre
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
117.15
598.15 Sperry Boss Gyro MS 1NRP 57.0' Copy (11
BOSS -GYRO
Spent' -Sun BOSS gyro mu9ishot
598.15
6,114.15 MWD (11-23)
MWD
MWD -Standard
6,114.15
6,450.00 11-23B WP08 (PLAN 11-23B)
MWD
MWD -Standard
8,450.00
6,880.00 11-23B WPOS (PLAN 11-238)
BLIND
Blind drilling
6,880.00
10,636.0011-23B WP08(PLAN 11-23B)
MWD
MWD - Standard
6,880.00
10,636.00 11-23BWP08 (PLAN 11-23B)
MWD+IFR+MS-WOCA
MWD +IFIR +Multi Station W/O Crustal
10,636.00
15,252.34 11-23B WP08 (PLAN 11-23B)
MWD
MWD -Standard
10,636.00
15,252.34 11-23B WP08 (PLAN 11-23B)
MWD+IFR+MS-WOCA
MWD+ IFR +Multi Station W/O Crustal
Summary
Site Name
Offset Well - Wellbore - Design
Lis DS 02
1-2-08 -1-2-08A- -2-08A
Lis DS 03
1-3-11 - 1-3-11 - 13-11
1-3-15 - 1-3-15 -1-3-15
1-3-23 - 1-3-23 - 1-3-23
PB DS 11
11-09 - 11-09 - 11-09
11-09 - 11-09A - 11-09A
11-10 - 11-10 - 11-10
11-10 - 11-10A- 11-10A
11-11 - 11-11 - 11-11
11-23 - 11-23 - 11-23
11-23 - 11-23A - 11-23A
11-27 - 11-27 - 11-27
11-28 - 11-28 - 11-28
11-28 - 11-28A- 11-28A
11-28 - 11-28B - 11-28B
11-30 - 11-30 - 11-30
11-30 - 11-30A - 11-30A
11-33 - 11-33 - 11-33
Plan Lisburne- Plan Lisburne - Lisburne Wp 1.0
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation Warning
Depth
Depth
Distance
(usft)
from Plan
(usft)
(usft)
(usft)
6,124.56
(usft)
14,405.06
15,588.00
258.72
52.85
242.93 Pass - Minor 1/200
2/152018 11:40.94AM Page 2 of 3 COMPASS 5000.1 Build 8l D
Out of range
14,272.86
10,375.00
1,423.41
364.41
1,105.96
Pass - Major Risk
10,999.87
10,350.00
353.40
283.60
80.25
Pass -Major Risk
6,124.56
6,700.00
1,303.59
254.34
1,058.11
Pass -Major Risk
6,125.26
6,700.00
1,304.02
254.39
1,058.51
Pass - Major Risk
8,875.82
9,525.00
897.85
331.18
665.10
Pass - Major Risk
8,875.82
9,525.00
897.85
330.92
665.36
Pass - Major Risk
Out of range
6,494.07
6,475.00
1.43
2.57
1.43
Pass-NOERRORS
6,489.38
6,475.00
142
2.21
1.42
Pass-NOERRORS
11,660.15
12,210.00
971.84
406.98
566.50
Pass - Major Risk
Out of range
Out of range
Out of range
9,196.42
9,175.00
243.05
72.52
186.59
Pass -Mirror 11200
9,266.59
9,250.00
240.96
47.56
240.49
Pass - Minor 1/200
Out of range
Out of range
2/152018 11:40.94AM Page 2 of 3 COMPASS 5000.1 Build 8l D
by
Company:
North America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 11
Site Error:
O.00usft
Reference Well:
11-23
Well Error:
O.00usft
Reference Wellbore
PLAN 11-23B
Reference Design:
11-23B WPOB
r
BP BA, ICER
Antioollision Report UGHES
GE<.,,
Local Co-ordinate Reference:
Well 11-23
TVD Reference:
11-23B Plan RKB @ 74.15usft (11-238 Plan RKB)
MD Reference:
11-23B Plan RKB @ 74.15usft (11-23B Plan RKB)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Output errors are at
1.00 sigma
Database:
EDM R5K - Alaska PROD - ANCP1
Offset TVD Reference:
Offset Datum
Reference Depths are relative to 11-23B Plan RKB @ 74.15usft Coordinates are relative to: 11-23
)ffset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK
ventral Meridian is 150° 0' 0.000 W' Grid Convergence at Surface is: 1.58"
Ladder Plot
1800
I I I I I
sI
31350 - - - --- '- -I
o I I I I
v '
C _ J _ _ _ _ _ _ _ _ J _ J _ _
0
n
�
900-
1E
0 t
00 C1
_J _J _J J _J _
U 1 1 I I
O
2
I I
I I
r I I
� 450
� I
I
I I I
0
0 2500 5000 7500 10000 12500 15000
Measured Depth (2500 usft/n)
LEGEND
11-09,11-09A,11-09AV2
—W 11-27,11-27,11-27V1
11-09,11-09,11-09V1
11-28,11-28,11-28V1
11-10,11-10,11-10V1
—f— 11-28,11-28B, 11-28B VO
11-10,11-1 OA, 11-1 OA VO
$ 11-28,11-28A, 11-28AV10
11-11,11-11,11-11 V1
$ 1130,11-30A, 11-30AVO
11-23,11-23A, 11-23A V1
—0— 11-30,11-30,11-3OV1
11-23,11-23,11-23VO
$ 1133,11-33,11-33V1
$ 1-3-23,1-3-23,1-3-23V1
—rte L2-08, L2-0SA,L2.OBA V2
$ L3 -15,L3 -15,L3 -15V2
—dr Plan Lisbume,Plan Lisbume, Lisbume VYp1
$ 1-3-11,1-3-11,1-3-11 V7
$ 11-23BWP08
2/15/1018 11:40:34AM Page 3 of 3 COMPASS 50001 Build 81D
WELL DETAILS. 11-23
G,nom Level 2720
rNFS sEI�V NorNiTg Eesing Laitud, LongiW4e Slot
0.00 0.00 5952810.850 ]0]155.9]0 70`15'28.245N 148'192].005W
WELLBORE DETAIM PUN 11-23B
Project: Prudhoe Bay
11-236
wonkwnnx
bp
Site: PBDS11
Wall 11-230Wellbore:
Parent Wellbore 11-23
�ov
Tie on MD6114.15
PL 1411.2313
PNn:11-2313507708711-2WPIAN11-2313)
q
uwn. n.
WELL DETAILS. 11-23
G,nom Level 2720
rNFS sEI�V NorNiTg Eesing Laitud, LongiW4e Slot
0.00 0.00 5952810.850 ]0]155.9]0 70`15'28.245N 148'192].005W
WELLBORE DETAIM PUN 11-23B
PEFPAE7K;EKUM1Mw
11-236
Coai4ireb(wE1�Msia: welllf 1.y T,u. WrN
VekalINDl Relnerca II-25BPIsn I1NBB]A 15us11112]9P6n RNRI
Parent Wellbore 11-23
sweol N$)Pa&enm. sbl IvOBN DM
Tie on MD6114.15
MsseardCoth RNuerce: D23BMw PBB@]4.EN(h28BPIPi
LtJebnwhool M. -C.
SECTKINDETAILS
,
wax
G46114G�TNLS
q
MD "I Ari ND R46S 'FJ.W
Okg TF. VBM Ta19et
II -2113 N'No
ND MD sp.
In
9My
6114.15 53.50 336.50 470899 3220.49 -1030.67
6450.00 5475 335.16 4905.71 346903 .114746
0.00 0.00 3370.44
054 -0724 364244
anan lW3s.00 7' 7.aoo
.1. 5. 41rr 4sW
I1-1313Tx
646600 5477 332.71 4914.94 348077 114720
1250 9000 365548
O eax
648600 5477 33271 492648 349529 115469
0.00 000 367776
uwTP1oK
H -PBT] }
Op
1-23BIE
125500 3291321.79547853 391467 143766
7.00464.77419271
,.
7022116 3291 321.79 7968.72 521099 242&39
000 000 574301
Nv w Mo.
1038567 3050 33000 810&74 528230 .247&94
300 12264 582743
noew ...u5 TIP
11-23BTi
10635.67 30.50 330.00 8324.15 539219 -2540.38
0.00 0.00 5953.19
anon+ wwm xav
rpl4s4 Mw searmaonmaaeomw
--
10835.67 30.50 330.00 8496A8 5460.10 -2591.13
0.00 0.00 6053.80
M269 600 SMOLS300TF04M77
11430.67 90.00 330.00 877&64 5907.64 -2837.97
10.00 0.00 6543.09
1 waIa IIss.W slM mm.la... Ir n).
11930.67 90.00 330.00 877&64 6340.65 4087.97
0.00 090 7038.65
Iws72 iwPu6 radow3wwolthm
610874 iwMBl sbl2som+tl+tl+waSeTw
fi6M
,
12030.67 91.53 331.29 8777.30 6427.79 -313&99
200 40.00 7137.89
812415 ea l SG1We.h4b01w1887w
one".ionto srdeamnao
« Gx1U
72430.67 91.53 331.29 8766.60 6778.48 -332810
12482.27 90.50 331.29 8765.69 6823.72 -335388
0.00 0.00 7535.30
200 180.00 758&57
ene64114mm apnw000kpaN4m.mw
Ellflel u9Ao7 S.M1201100o
O
12832.27 90.50 331.29 876264 7130.67 452203
0.00 0.00 7934.41
tMe nowt. 67M
rn sm9
I 12882.27 91.50 331.29 8761.76 7171,52 -354&05
2.00 000 7984.09
most. IMIV smv,op xao
1328227 91.50 331.29 8751.29 7525.21 373&16
0.00 0.00 8381.50
emsm 2482m A.'awkMelEwznw
1363227 93.29 341.64 8736.63 7845.35 3877.62
3.03 80.00 8730.63
Me 4 not Uadoed 20o
1 116175 12MI27 smwmorwNawzl]w
4811
14432.27 9260 5.66 8694.94 8633.57 3965.25
3.50 91.00 949291
MUD INU27 sarrOSS a4TF0Wm
14512.16 91.00 5.66 8692.43 871303 -3957.36
2.00 180.00 956739
alone ;3Pz27 SWOUSUDTFONao
4,111
1494216 91.00 5.66 8694.93 9140.86 -3914,93
0.00 0.00 994292
ams4 XUo smLas2m TFa 411
Moo MizM s e"n oMNY+es.x+sw
15157.34 108.21 5.66 8649.15 9351.19 .3894.07
8.00 0.001012&50
edoo l C,M sadowtomTne'o
Are
rrn
-nm -noo u
15252.34 108.21 5.66 6619.46 9440.99 -885.16
0.00 0.0010209.16
weals loh...%A. a1515714w
_ 65 a. 1s45214 Meeting
4550
TIP
KOP Soe20
00 hold 46402. MMD
!
49N1
0
- UGi - - --.
Sw,L➢25300 TFO-1637]
- Jul SIN2966. 16h01dL7215,UUMD
52
^O
56
. a
^ �
SIon DLS3 DUTP0122 W
DOI
S59*
SW210 00 holdal lmn5
67MD
a
on 61W
SIW200(101101da1111(35,67MD
WSE 141
0
J Fe\J
51ar1Bolla lMUM
m5c,
-.
CM3
S
lb
or
CME.1\R
QVJ 5 ^°a 4
0
c c
ll
53 y o .1 .`y
v.. 01 e
CMI
M(oo.
fit+'
8050_
-
55� 2 S ZT 53
�� `
TFIPG-..�iA
55��
SHC
s
Sad
F,
_
p
�IdwaBe)
>..
875
II-DBi'1
o'
= - - _. =o DT'
II-23BTD Q
91
_ _
y
II-23BT2
IIiJ II-2lBTX
`Br
MS
Ian RKB®
I-_-._--.-_ ----- - - _
4.15us8 (11238 Plan RK9)
--.. -.
II -11111"1 II -23B T6 II-23BT7
II -238T5
I-II
7850 3150 3350 3150 4250 4550 49•ll 5230 SGW 5950 6300 6650 71100 7350 77w PU50 BJW 777511 9150 MSU 97700 10150
777850 707750 1120M 11550 11
BAF�UGHES
I
I I-IMT4
I -2381'i
11-238T2
II -13871
I I-2313 PmiIL I
.1.m
SUNEYP�R4M
Oeb:3118U2r1919m9 VNUakd. ym Voten'.
Owner real searrPla1 TW
11].15 598.15 Sperry Bacl3I,0MSW111-231
98.15 6114.15 MWD(1Ia) MWD
6114.15 64918 Ii-ZM%VPM(PIANII-23B1 MND
6W.W M.M It-23IMPPAFANfIePHp
mm 1MA6AB 1133B15PO87PlAN 11 OW
MM 106161,0 I1-23BWP50tPUN11-238) IWNFR+ASiM1b(A
10636011 1525234 I1 -BIH PEfi0P ANtl4 M
10hithm 1525234 I1 -AB WP[fi1PUN11-2313) MVD4FR.MSIV(%'A
,
II -2113 N'No
12 1 LPBra,
In
I1-1313Tx
H -PBT] }
1-23BIE
11-23BTi
I I-IMT4
I -2381'i
11-238T2
II -13871
I I-2313 PmiIL I
.1.m
SUNEYP�R4M
Oeb:3118U2r1919m9 VNUakd. ym Voten'.
Owner real searrPla1 TW
11].15 598.15 Sperry Bacl3I,0MSW111-231
98.15 6114.15 MWD(1Ia) MWD
6114.15 64918 Ii-ZM%VPM(PIANII-23B1 MND
6W.W M.M It-23IMPPAFANfIePHp
mm 1MA6AB 1133B15PO87PlAN 11 OW
MM 106161,0 I1-23BWP50tPUN11-238) IWNFR+ASiM1b(A
10636011 1525234 I1 -BIH PEfi0P ANtl4 M
10hithm 1525234 I1 -AB WP[fi1PUN11-2313) MVD4FR.MSIV(%'A
ANTISOILISION SETTINGS
InterpolatorMethod MD merv.1'.25.00
Depth RO From 6114.15 To 1525234
Retuh, Li OJBy Cent Oslance: 172065
R.m.m.e, Plan 11 23B WP08111 231P1AN ll -2381
Skl
Azimuth from North [o] vs Centre to Centre Separation [25 usff/in]
Project:P11aY
PROGRNM
l.^
BIM: PBs Ds DS „
a. -07th 364".6,66.01
Ut/
Well: 11-23
Vempn:
Walloon, PLAN11-23B
Depth To
Plan: 11-238WP08(,1-2XPLAN II -2311)
Tool
SW -160.]] ,19911
0.00 oW 57..t
SW 1220 502>43
11].15
WFI.LO6TPII5. 11.23
SPerry6ose Gym MGWRP5T.0' Copy(11-231
Grountl level.
hence] 36501tl1O Gam. $..In .E911,
ID
0.00 �FIVJ
la[Iflutle ImdWb
0.m0 000
963810860 '101156.810 i0°16']8.9G6N 1,0'tB'91g06W
m.. ISS".
ANTISOILISION SETTINGS
InterpolatorMethod MD merv.1'.25.00
Depth RO From 6114.15 To 1525234
Retuh, Li OJBy Cent Oslance: 172065
R.m.m.e, Plan 11 23B WP08111 231P1AN ll -2381
Skl
Azimuth from North [o] vs Centre to Centre Separation [25 usff/in]
A
_ J
-SURVEY
PROGRNM
-- {
BAKER
a. -07th 364".6,66.01
DeM.2018-02-067000000 VpaB6m9:Yes
Vempn:
Depth From
Depth To
SuneyRan
Tool
SW -160.]] ,19911
0.00 oW 57..t
SW 1220 502>43
11].15
588,15
SPerry6ose Gym MGWRP5T.0' Copy(11-231
60SS-GYRO
hence] 36501tl1O Gam. $..In .E911,
SB6.15
6114.15
MOAD (tb23)
MWD
6999-fi5DD
6114.15
6450.00
11-238 MW (PLAN 11-2381
MWD
W 1800 158851
ON) 003 ]934,41
645000
6880.00
11-238 MOB (PIAN 11.238)
BLIND
1X32, 93b 31181 5]X83 1w 5.X 48]2b2
6880.00
1083600
11-238 MOB (FILAR 11 .23B)
MWD
6680.00
10636.00
11-238 MOB(PWN I1-238)
MND-FR-M5-WOCh
OW 040 994992
aW O.W 101 ]HSD
10636.00
1525234
It -238 WPO: (PIAN 11-236)
MWD
1063800
15252.34
11236 MOB (PIAN tI-23B)
MWDNFR-MS-WOL
A
_ J
11.11, me 11 S. Sale. 9400 49916 OW 0010209 6
Azimuth from North [e] vs Centre to Centre Separation [8 usfUin]
611015 5]50 336.00 VoSM Soo. NOWP
OW OW, ]3]OM
-- {
BAKER
a. -07th 364".6,66.01
UGH ES
1950 once ac&.
&6603 64.]] 332]1 0.9E6,b 3,%21 111489
008 OW X]1]6
From CoW To MD
I -i
SW -160.]] ,19911
0.00 oW 57..t
SW 1220 502>43
P✓+u'1 6w w
I095P 3050 3bV 6320.15 53B3.IS 3540%
OLU coo 595319
c--9
hence] 36501tl1O Gam. $..In .E911,
ow O,W fio53At
11.11, me 11 S. Sale. 9400 49916 OW 0010209 6
Azimuth from North [e] vs Centre to Centre Separation [8 usfUin]
611015 5]50 336.00 VoSM Soo. NOWP
OW OW, ]3]OM
61500 ,)5 ]35.16 emp'v.]1 .0 -1101-
a. -07th 364".6,66.01
50.]] 332]1 .1. 3199.n -110 m
1950 once ac&.
&6603 64.]] 332]1 0.9E6,b 3,%21 111489
008 OW X]1]6
From CoW To MD
]956.03 3281 32179 54]853 XMP .10186
10an.% 3161 396,4 I. 5210. 3,2698
10]BSd] 3050 3X0 660814 Sam. 2RVR
SW -160.]] ,19911
0.00 oW 57..t
SW 1220 502>43
I095P 3050 3bV 6320.15 53B3.IS 3540%
OLU coo 595319
hence] 36501tl1O Gam. $..In .E911,
ow O,W fio53At
6110-690
II0.N 6] Sem. 3XD] 8]]584 SBO]N .708
119N.n] no 9th W B115de 634081 40819]
IOTA 0. 650!9
040 0. 63695
6999-fi5DD
12IXW.6] BI d3 X, 'D 5112,4 6.2)6 313699
12430.6] 91. 331.29 8]66811 6]]8°6 oar,
2. 4of9 It..
o4G Ow Tv3530
8500 10500
121529] 050 3N.99 at SW 6623.12 3I98n
126322] We 33129 5]6244 212067 .EIIAI
W 1800 158851
ON) 003 ]934,41
105DO -11200196521]
91. Se .29 US . 1114.. .0
132Y9P 9150 33129 8315 ]59591 96X.16
2. OW Mean
OW OW 53950
11200- 15252
1X32, 93b 31181 5]X83 1w 5.X 48]2b2
SW Wm 6]3061
ir2c, F. 666 6690.64 n9>51 4085b
3A] 91.0 919291
161216 91,40 Sbfi 8920 5T1]9 435]56
208 itltO 9563,4
104216 91,40 SP 5z9. 0.83 9190% 461183
1S15]3, nm6 l 1. . 131 tronAl +16N.0T
OW 040 994992
aW O.W 101 ]HSD
11.11, me 11 S. Sale. 9400 49916 OW 0010209 6
Azimuth from North [e] vs Centre to Centre Separation [8 usfUin]
North America - ALASKA - BP
Prudhoe Bay
PB DS 11
11-23
PLAN 11-23B
11-23B WP08 Plus 500ft MD
AOGCC Offset Well Report
07 March, 2018
BA ER
IGIHES
BAT
GE company
AOGCC
b BP BAT(ER
p Anticollision Report �jUGHES
a GEcom,,
Company:
Norm America - ALASKA - BP
Project:
Prudhoe Bay
Reference Site:
PB DS 11
Site Error:
O.00usft
Reference Well:
11-23
Well Error:
O.00usft
Reference Wellbore
PLAN 11-23B
Reference Design:
11-23B WP08 Plus 500ft MD
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
Norm Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 11-23
11-238 Plan RKB @ 74.15usft (11-238 Plan RKB)
11-23B Plan RKB @ 74.15usfi (11-23B Plan RKB)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
Reference
11-23B WP08 Plus 500ft MD
Fitter type:
NO GLOBAL FILTER: Using user defined selection & filtering criteria
To
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 200.00usft Error Surface:
Elliptical Conic
Survey Tool Program
Date 3/7/2018
From
To
Offset
Centre to
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
117.15
598.15 Sperry Boss Gyro MS WRP 57.0' Copy (11
BOSS -GYRO
Sperry -Sun BOSS gyro multishot
598.15
6,114.15 MWD (11-23)
MWD
MWD - Standard
6,114.15
6,450.0011-23B WPO8 Plus 500ft MD (PLAN 11-23
MWD
MWD - Standard
6,450.00
6,880.00 11-23B WPO8 Plus 500ft MD (PLAN 11-23
BLIND
Blind tlnlling
6,880.00
10,636.0011-23B WPO8 Plus 500ft MD (PLAN 11-23
MWD
MWD - Standard
6,880.00
10,636.00 11-23B WP08 Plus 500ft MD (PLAN 11-23
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
10,636.00
15,252.3411-23B WP08 Plus 500ft MID (PLAN 11-23
MWD
MWD - Standard
10,636.00
15,752.34 11-23B WPOB Plus 500ft MD (PLAN 11-23
MWD+IFR+MS-WOCA
MWD + IFR + Multi Station W/O Crustal
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
Lis DS 02
Lis DS 03
PB DS 11
11-09 - 11-09 - 11-09
868.58
850.00
53.73
11 -09 -11 -09A -11-09A
869.48
850.00
53.74
11-10-11-10-11-10
565.43
550.00
54.82
11-10- 11-10A- 11-10A
565.43
550.00
54.82
11-11 - 11-11 - 11-11
586.86
575.00
172.60
11-23- 11-23- 11-23
6,568.86
6,550.00
4.81
11-23-11-23A- 11-23A
11,423.47
11,450.00
149.17
11 -23 -PLAN 11-238-11-23BWPO8
10,625.00
10,625.00
0.00
11-30-11-30-11-30
1,768.67
1,725.00
97.04
11 -30 -11 -30A -11-30A
1,768.67
1,725.00
97.04
Plan Lisburne - Plan Lisburne - Lisburne Wp 1.0
589.63
575.00
111.55
3/7/2018 2:10:27PM Page 2 of 31 COMPASS 5000 1 Build 81D
AOGCC
Aawmn.ma WELLBORE DETAILS: PI 11.236 160ENC9�tigUlU9N
Project: PrudhoeBaY M.wkwm'. v.0
SiN: PHDSII
i�—.� 11-236 nVaetimaM�ileW9lFee,aereernanNeh
W.9 11-3 sram9aMfi®e 74
,SanZFMPR) �AJ(ER
Wepbom: P2Parent Wellbore 9nqn Plan:11-23BWPe9 PIu5WnD(MR1SPAN11-23B) X9®24159al-0Y9UGHESTiAD'611415 9 fd : nmpenr
Go
N
O
m m OI
m m
o m
O
m m
m m
m m
m
q
J
S
O
J J
a O
n m
O O
J
O
N
J
O G
N
J
N
J
m
O
Easting (400 usftlin)
J o V V J
y yO O O O
m O A m m m
O O
Nit o 0 o S
G
O
J J
q q
A m
O O
o 0
a J
O
N OJI
O O
0 0
J
O O
m m
J
O
J
O
m
O
J
O
q
O
J
+
O
O
V
E
V
O
V
N
V
m
J
+
O
O
596328
-
$
-
5963200
11-23B WP08
Plus
500ft MD
sffi q
5962800
11-238
WP°e P1. soon Mo
$
5962400
5962400
596M-
11-230
WPOS
5962000
59516W
L2
GSA59510
5961200
L] -i5
c
o $
5961200
5960800
- 11-23
11-09
5960BO0
1L23A
O
5
8000
5960900
C 595000D
g000
1-09A
59600002
5959600
v-]°
e
5959600 �
C 5959200
1130A
-
'1000
5959200"
U5958800
-
1`^'0 -
e00o
5958800 O
5958400
nage
-
11 n0
-
-
5958900
C
5958000.
1182
1000
11.29A
5958000`-'
58576 00
-
�0
0° 9000
n -,OA
0 OO
-
5957800
I1-28:
L]-2]
O
5957200
-
- -
1
9WO
.5957200
5 95680010p0
Ip
5956800
tt-33
5955400
l80
X00 `
sa0p
5956400
o
BRp
5956000
-e`�
-
5955000
5955600
--
- -
IPoo
°dfl
A�
-
5955600
nay
5955200
-
-
-P
5955200
4000
e00.
5959800
NS
w m
mS
mmm
Go
mS
mSS
am
vo
m
uuu
2 u
2
S
m
J
ma
Jo
m
mmmmmm
�m
uo
S
S
SSSSSS
S
S
S
S
m oam
So SS
S S
o mn
SSSSSoSS
o a
m
m
o
S
S
S
m
S
S
Easting (400 usftlin)
Plan RKB 4g 74.15usfl
(11-230 Plan RIGS)
AOGCC
TOP
■d
mf t'S
it
y
LB i ' IngE V:
i w
sPwt SRDE
l3w
13 5/r w fl.YQ 10P
135111' w nIMCm BDIIw
w FlMI® ISINLDL G1F YLLS4
Yvr w YDIWNIO nW Nmw ftw Yb. , 9y0.Fl >
}1/r w flFll tt0g 133/r w q BDllw
DOUBLE Sllf ID1pIFN
135/e w NNEm 1W
1,• w BILGED BDIIW
1lllBll IBD Nnr. IFwD CpBtan1110M
INE PoR QN OP,'E OKY !IIS CISIC SPODE ISSEIBY
PBWDRY ,1' w nAMDFD lm
11' w RNYfD BDIIDY
f/9C ISIY Id11D6Y
w N M
6012 BOP STACK (DRAFT
F1AMBpX WCL InRF:
Y' M PPE SFA NFSDSD TO 11E B OF m I10NBNf
0M,
DBtd DM m1E INIAYIHE B,bER SFIE BEIl
SIU N
Ir m w IBPq 1r w Lam
r uaxc Iu ounEr lO1Y a z)
I] s/Y w BDDw l)2 n,vLF
lY ImPSA SSAL4CAp
(, G) 3' oM SN. ONIIET
1, ul r oM sIM a,lnET
allot = Dont F1NBE
BIBBBIB iM..
13-5/r w s1Mlrm LYf
1s /e• w SIma mp
13.3/0' w FWIDFD BDlfdl
m 1 BDP:
13 SO w INN 11012 NMI BOP
13 5/r w Slt-0F) w
13 S/Y w IWOED Barrom
N/ ]-1/2' W LDtl6 Y/ Ill WDSIFR
DMSBLG f -
135/ru SBDOPD 1»P
1 N (3 I1W w Sin: DULLER
LaE LM
2-1/16'M FM WE
r1/s' w ruxcED uvaMi DVE mw
>-1/B' w FUNDED nDNSIIC f.11E WK
Iw1 tBDP:
13 Ale w NDIOPIDIE BOP
13 S/D' w sID ], POP
elnoff
,] !/r nBID w nDN
8.3.17 L.C.)
5
f
'Eu � �aGi e0u9EH
/}3C0-030
I
IIP 7207)
$L P A
^351NG1
�N S_l
resp=uC
�PIb
6
X019
q-3CP /IB
°�232��_0002
i
I[- 13
t acCn.,Jf
y io963
0 1
n11B33G n,905dELNN1�
9 5�3 C
1,21531
I��V,-,;
A,.
X 9 5/8 X I" 4 I:
REF: lM'.n1]421,,I: v
Op12LMIC9U698 Hyl
O
fMCaa.woyr o
O
I
T T
: L' V'..: _
—�
is 5000 M03 2� S'i
c 5000 VDD '20 Gv A, M
.� .....1'. VDD
'VJ ''(4_C Af�1110�0�
DV100023D07
P&A 11-23A SAFETY NOTES: WELL ANGLE> 70'@ 11274—
D r f – - - -- 2184' r4--I-r2---HES FiRO SVLN SSSV Np, D -=-3.-8-1-3--1
13-3/8" CSG, 72#, L-80, D = 12.347" 2763'
TOP OF 7" LNR 7008'
9-5/8" CSG, 47#, L-80, D = 8.681" 7180'
Minimum ID = 2.441" @ 13061'
3-1/2" X 2-7/8" CROSSOVER
DPZ 3 - LCU 10,671' MD (8,249' TVDss)
GAS LFT MANDRELS
ST
M)
WELLHEAD=
CNV
ACTUATOR=
B_KRC
KB. ELEV =
-62'
BF. ELEV =
_ -.
KOP=
1100'
Nbx Angle =
101"Q 13279'i
Datum MJ=
11615'1
Datumm=
_
880Y SS
P&A 11-23A SAFETY NOTES: WELL ANGLE> 70'@ 11274—
D r f – - - -- 2184' r4--I-r2---HES FiRO SVLN SSSV Np, D -=-3.-8-1-3--1
13-3/8" CSG, 72#, L-80, D = 12.347" 2763'
TOP OF 7" LNR 7008'
9-5/8" CSG, 47#, L-80, D = 8.681" 7180'
Minimum ID = 2.441" @ 13061'
3-1/2" X 2-7/8" CROSSOVER
DPZ 3 - LCU 10,671' MD (8,249' TVDss)
GAS LFT MANDRELS
ST
M)
I ND
I DEV
I TYPE
I VLV
I LATCH
I PORT
I DATE
1
4081
3364
52
CA -TB
DMY
T-2
0
08/08/15
2
6571
4969
55
CA -TB
DW
T-2
0
08/08115
3
7820
5810
33
KBGr2-1-S
DW
M
0
07/13111
4
8251
6180
29
KBG-2-LS
DW
M
0
09/12/97
5
10876
8472
38
K3G-2-LS
DFAY
M
0
09/12/97
Base DPZ 1 - CM3 8,894' MD (6,690' TVDss)
4-1/2" I$ X
ELMO TT NOT LOGGED
1 11932' 1
4-12" TBG, 12.6#, 13 -CR 0.0152 bpf, D = 3.958" 11038' \
T
13061'TOP OF 4-1/2"LNR\♦ \
\ \/
14-12" LNR 12.6#, 13 -CR -80..0152 bpf. D= 3.958" I
14-1/2" SLTD LNR 12.6#. 13 -CR -80..0152 bpf. D = 3.958" I
LNR, 6.5#, L-80, .0058 bpf, ID = 2.441" 1� 13092'
12-7/8" SLID LNR 6.5#. L-&1..0058 bof. D = 2.441" I
PERFORATION SLAWARY
REF LOG: AWS ACOUSTLOG ON 06/30/94
ANGLE AT TOP PEW: 52 Q 11126
Note: %fer to Production OB for historical pert data
S¢E SFF INTERVAL I Opn/Sgz DAIS
PRUDHOE BAY IUNR
WELL: 11-23A
PERMNo: '1940810
APINo: 50-029-21610-01
SEC 28, T11 K R15E, 1096' FSL & 364' FEL
DATE REV BY I COMMENTS
See Page 2 for PErtoration Data
1986 JOMINALOOIVPLETION
0728/11 MSS/PJ GLV CfO (07/13111)
12-7/8' LNR-CT. 6.5#. L-80..0058 bof. D = 2.441" I
14-1/2" PORTED JONT- 40' 1
PRUDHOE BAY IUNR
WELL: 11-23A
PERMNo: '1940810
APINo: 50-029-21610-01
SEC 28, T11 K R15E, 1096' FSL & 364' FEL
DATE REV BY I COMMENTS
DATE REV BY I COMMENTS
1986 JOMINALOOIVPLETION
0728/11 MSS/PJ GLV CfO (07/13111)
10/15195 CSIH
127112GJIMGCJO (12114112)
SIS- CVEONS215
08/28/ D
JA�01/12101 SET PX PLUG/GLV CrO(8/8/15)
0123101 SIS -ND IFML
11117115 TBDIJMO RESEF FLL)G (10105115)
0227/02 RWTP ICORRECMNS
I I
SP Exploration (Alaska)
MUCV VT
Cw
ACTUATOR = BKR C
KB. BBV =
62'
BF. ELEV =
I
KOP=
1100'
Max Angle =
101" @ 13279'
Datum Mfl=
11615'
DaWm TVD=
880USS
L-80, D= 12.347'
TOP OF 7' LNR
:. L -Rn n=R RRt•
2763'
7006'
7160'
Minimum ID = 2A41" @ 13061'
3-1/2" X 2-7/8" CROSSOVER
11-23A FsAFETY
NOTES: WELL ANGLE> 70'@ 11274""`
2W—v184' 4-12' FES H RO SV LN SSSV MP, D = 3.813'
®
GAS LFT MANDRELS
11016
XF 1101,
11038' J-[4-12• VVLEG
ELMD TT NOT LOGO
11884' 7" X 4-12" TW SS HIGH ANGLE FGR
i¢SV H 7400' �
13-0-6-0'
4-12"TBG,12.6#,13}CR0.0152bpf,D=3.958' 11038' ♦ 13061 '
TOPOF4-112'LN19'
TLR29#,13-CR/M-80,0.0371bpf,D=8.1812153'
958'
4-1/2'LNR12.6#,13-CR-80,.0152bpf, 2� r 4-312-1'2 G' XSE2A-7L/8S"1X18-O, ,D D
-
=
SLTD L W 12.6#, 13 -CR -80, .0152 bpf, D = 3.958' 11 13077'
LMR, 12.6#, 13 -CR -80, .0152 bpf, D = 3.958- -
2-7/8' LMR 6.5#, L-80, .0058 bpf. ID = 2.441'
PERFORATION SL#,WRY
REF LOG: AWS ACOUSTLOG ON 06/30/94
ANGLE AT TOP PERF 52 @ 11126'
Note: Refer to Production DB for historical perf data
INTERVALOpn/Sgz
PRLCHOE BAY UNIT
WELL: 11-23A
PERMrr tb: '1940810
ARM 50-029-2161001
SEC 28, TI 1N, R15E 1096' FSL & 364' FEF
I
ST
MD
TVD
DEV
TY IE
VLV
LATCH
PORE
DATE
0227/02 RPYTP CORRECTIONS 11
1 1
BP Exploration (Alaska)
`
1
4081
3364
52
CA -TB
DW
T-2
0
0&08115
2
6571
4969
55
CA -TB
DMY
T-2
0
08/M15
3
7820
5810
33
KBG-2-LS
D"
IM
0
07113/11
4
8251
6180
29
KBCr2-LS
DA41'
M
0
09/12/97
5
10876
8472
38
113&2 -LS
DW
M
0
09/12/97
11016
XF 1101,
11038' J-[4-12• VVLEG
ELMD TT NOT LOGO
11884' 7" X 4-12" TW SS HIGH ANGLE FGR
i¢SV H 7400' �
13-0-6-0'
4-12"TBG,12.6#,13}CR0.0152bpf,D=3.958' 11038' ♦ 13061 '
TOPOF4-112'LN19'
TLR29#,13-CR/M-80,0.0371bpf,D=8.1812153'
958'
4-1/2'LNR12.6#,13-CR-80,.0152bpf, 2� r 4-312-1'2 G' XSE2A-7L/8S"1X18-O, ,D D
-
=
SLTD L W 12.6#, 13 -CR -80, .0152 bpf, D = 3.958' 11 13077'
LMR, 12.6#, 13 -CR -80, .0152 bpf, D = 3.958- -
2-7/8' LMR 6.5#, L-80, .0058 bpf. ID = 2.441'
PERFORATION SL#,WRY
REF LOG: AWS ACOUSTLOG ON 06/30/94
ANGLE AT TOP PERF 52 @ 11126'
Note: Refer to Production DB for historical perf data
INTERVALOpn/Sgz
PRLCHOE BAY UNIT
WELL: 11-23A
PERMrr tb: '1940810
ARM 50-029-2161001
SEC 28, TI 1N, R15E 1096' FSL & 364' FEF
DATE REI/ BY I 000084TS
72tPage 2 for Perforation Data
1986 ORIGINAL COMPLETION
0728/11 I MSS/ PJCJ GLV 00 (07/13/11)
" SLTD LNR, 6.5#, L-80, .0058 bpf, D = 2.441'
12-7/8' LMR -CT, 6.5#, L-80, .0058 bpf, D = 2.441" I
PRLCHOE BAY UNIT
WELL: 11-23A
PERMrr tb: '1940810
ARM 50-029-2161001
SEC 28, TI 1N, R15E 1096' FSL & 364' FEF
DATE REI/ BY I 000084TS
DATE I REV BY 1 00MMS4T5
1986 ORIGINAL COMPLETION
0728/11 I MSS/ PJCJ GLV 00 (07/13/11)
10/15/95 CT SIDETRACK
1227/12 BSEIJMD GLV CJO (12J14/12)
01/12/01 SIS -MAH CONVERTED TO CANVAS
0828/15 1 W.VJNUI SET PX PLt1CVGLV 00 (8/8/15)
0123/01 SI&Mfl FINAL
11/17/15 1 TBD/JMD RESET RUG (10/05/15)
0227/02 RPYTP CORRECTIONS 11
1 1
BP Exploration (Alaska)
TREE= KtEVOY
WELLFEAD=
MCEVOY
ACTUATOR =
BKR C
KB. El -EV =
62'
BF. ELEV =
O 0121/98
KOP =
1100'
WX Angle =
—10V @ 13279'
Datum KU=
11615'
Datum TVD=
8809 SS
P62FORATION SL&WRY
Rff LOG: AWS ACOIJSTLOG ON 06/30/94
ANGLE AT TOP P97F. 52 @ 11126
Note. Refer to Production DB for historical perf data
SIZE
SPF
INTERVAL
Opn/Sqz DATE
2-1/8'
4
11126-11130
O 0121/98
2-118'
4
11132-11136
O 0121/98
2-1/8'
4
11170-11176
O 0121/98
2-1/8'
4
11190-11194
O 01/21/98
3-318'
4
11220-11230
O 05/01/95
3-3/8'
4
11265-11275
O 05/01/95
3-318'
4
11276-11286
O 08/30/94
3-318'
4
11296-11301
O 08/30/94
NA
5
11948-12048
O 07/10/94
4-112'
32
11972-13077
SLTD 07/10/94
2-7/8'
13092-13333
SLTD 10/15/95
11-23A
PRLC"OE BAY LNTT
WELL: 11-23A
PEFMT No. 1940810
APINo 5402321610-01
SEC28, T11N, R15E, 1096' FSL & 364' FEL
DATE REV BY OOWANTS
DATE REV BY COMrSETS
1986 ORIGNAL COtrPLETION
07/28/11 bT5/ PJC GLV GO (07/13/11)
10/15/95 CT SIDETRACK
1227/12 BSE/JbD GLV GO (12114/12)
01/12/01 SIS -MM CONVERTED TO CANVAS
0828/15 MGS/JMD SET PX PLUUGLV CIO (818/15)
0123/01 SIS -W FNAL
11/17/15 TBWMD RESET RUG (10/05/15)
0227/02 RN/TP CORRECTIONS
BP Exploration (Alaska)
TRS= WFVo)
NEI-LHEAD=
CNV
-
ACTUATOR--
— —
BKR C
KB. E EV =
62'
BF. ELEV =
_
KOP=
1100'
WX Angle =
_° @
Whim MD=
Whim TVD =
8800SS
23B SAFETY NOTES: WELLANGLE>_°ID_'. MAX
PROPOSED 11
DL S: _" @ _'. °°'CHROME TEG & LHY"
4-1/2' HES X NP, D = 3.813'
1 2763' 1
Minimum ID = " (tD
TOP OF 7_LNR F—$
19-5/8' WHIPSTOCK (Y/) t
4-1/2' TBG, 12.8#, 13 -CR
.0152 bpf, D = 3.958'
.0383 bpi, D = 6.276'
PERFORATION SLUVARY
FRE= LOG: ON
ANGLE AT TOP PERF: _'@
Note: Flefer to Production DB for historical pert data
2- LNK 12.6#, 13 -CR
52 bpf, D = 3.958'
(.AS I FT MAHREI_S
ST
MD
TVD
DEV
TYPE
VLV
LATCH
PORT
DATE
6
5
4
3
2
1
300'-j9-5/8' X 7' WFO LTPwfrEBACK SLEEVE& -5/8' X 7' WFO LTPwfrEBACK SLEEVE&
WFD HGR V = 6.19'
MLLOUf "=W (11-23B) 6450' -
4-1/2- HES X PP, D = 3.013-
DATE REV BY COWElas
DOTE REV BY COMMENfB
1986 ORIGINAL COMPLETION
10115195 CT SIOEf WACK
_I_I_ SIDETRACK (11-238)
02/14/18 J&v BUILT PROPOSED
X 4-1/2'
/2' HES X
14 -1/2 -HES XN NP, IO=3.725' 1
SLEEVE &
HGR o = _'
' WLEG. D = 3.958'
PRUME BAY UNIT
WELL 11-23B
PEFW ND: '__
API No: 50029-21610-02
SEC 28. T71 K R15E 1096 FSL & 364' FEL
PBU 11-23B I <== Data Input
<== Data Input
<== Data Input
Weak point or LOT - Measured depth (ft)
Weak point or LOT True vertical depth (ft)
Weak point or LOT - Hole angle (deg)
Weak point or LOT - Hole size (in)
Weak Point Pressure or LOT - EMW (oDol
6,300'
<== Data Input
<== Data Input
<== Data Input
<== Data Input
<== Data Input
4,819'
5 .00
13.500"
12.10
of interest - Measured depth (ft)
10,636'
<== Data Input
of interest - True vertical depth (ft)
8,324
<== Data Input
of interest - Hole angle (deg)
31.00
<== Data Input
of interest - Hole size (in)
9.875"
<== Data Input
of interest - Pore pressure EMW (Ppa)
7.80
<== Data Input
hole assembly OD (in) 8.0" <_= Data Input
hole assembly length (ft) 151' <== Data Input
D OD (in) 5.000" 1 <== Data Input
BHA annular vol. L zone of interest (bbl/rt) U.03ZP
DP annular vol. @ zone of interest (bbl/ft) 0.0704
DP annular vol. A weak point (bbl/ft) 0.1528
<== Data Input
Weak point pressure (psi):
Plo
3,032 psi
Weak point pressure - Safety margin:
Max anticipated formation pressure (psi):
Prnax
Pmax EMW
Pf
3,032 psi
12.10 pp
3,376 psi
Weak Pt to Zone of Interest distance (TVD ft):
OH (TVD)
3,505'
Weak Pt to Zone of Interest distance (MD ft):
OH MD
4,336'
Maximum influx height at the bit (TVD ft):
H (TVD)
3,520'
Maximum influx height at the bit (MD ft):
H MD
4,106'
Calc. volume of (H) around BHA:
Calc. volume of (H) around drill pipe:
Calc. volume that H equals @ initial shut in:
V1 bha
Vldp
V1
N/A
N/A
N/A
Calc. vol. that H equals @ weak point (MD ft):
VWp
N/A
Calc. volume of Vwp @ initial shut in:
V2
N/A
influx height (H) extend V Loepp 3123118
Davies, Stephen F (DOA)
From: Gorham, Bradley M <Bradley.Gorham@bp.com>
Sent: Wednesday, March 21, 2018 7:33 AM
To: Davies, Stephen F (DOA)
Subject: RE: PBU 11-23 (PTD 218-092) - Question
Stephen,
The logging requirements on page 9, MWD/GR/RES/DEN/NEU, are accurate.
Let me know if there are any other questions.
Thanks,
Brad
Brad Gorham
BP Exploration (Alaska), Inc.
Drilling Engineer
W:(907)564-4649
C:(907)223-9529
Bradley.Gorham@bp.com
From: Davies, Stephen F (DOA) [mailto:steve.davies@alaska.gov]
Sent: Tuesday, March 20, 2018 6:02 PM
To: Gorham, Bradley M <Bradley.Gorham@bp.com>
Subject: PBU 11-23 (PTD 218-092) - Question
Bradley,
I'm reviewing BP's Permit to Drill application for PBU 11-23. The logging program on page 4 states that the production
hole will be logged with Dir/GR/RES/NEU, but the planned drilling program on page 9 says the BHA will have
MWD/GR/RES/DEN/NEU. Which is correct?
Thank you,
Steve Davies
AOGCC
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission
(AOGCQ State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use
or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding
it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviesCdalaska.gov.
•
Permit to Drill No. 218-029 - Coordinate Check
20 March 2018
INPUT OUTPUT
Geographic, NAD27 State Plane, NAD27
5004 -Alaska 4, U.S. Feet
PBU 11-23B 1/1
Latitude: 70 16 28.245 Northing/Y: 5952810.893
Longitude: 148 19 27.005 Easting/X: 707155.962
Convergence: 1 34 39.16675
ScaleFactor: 0.999948749
Remark:
Corpscon v6.0.1, U.S. Army Corps of Engineers
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150
Date:
3 ev
Well Name: PRUDHOE BAY UNIT 11-23B _ ._Program DEV Well bore seg ❑
PTD#:2180290 Company BP EXPLORATION (ALASKA) INC__ Initial Class/Type
DEV / PEND GeoAres 890 Unit 11650 On/Off Shore On_ Annular Disposal ❑
Administration
17
Non riven. gas conforms to AS31.05.0300. 1_A),Q.2.A-D) . . .... . ......... . . . .
NA
_ _ _ ... _ _ _ _ _ _ _ _ _ _ ..........
1
Pe[miI fee attached_ _ _ _ _ _ _ _ _ _ _ _ _ _ ....
NA
2
Lease number appropriate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ... _
Yes
_ _ Surface Location lies within ADLO028325; Top Prod Int & TO lie within ADL0028322.
3
Unique well name and number _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
4
Well located in a defined pool _ _ _ _ _ _ _Yes
PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341 F
5
Well located proper distance from drilling unit boundary _ _ _ .....
Yes
_ CO 341F. Rule 2: There shall be no restrictions as to well. spacing. except that. no pay shall be
6
Well located proper distance from other wells _ .. _ _ _
Yes
_ opened in a well closer than 500 feet to the boundary of the. affected_ area. Planned well conforms to CO _
7
Sufficient acreage available in. drilling unit _ _ _
Yes
341F, Rule 2....
8
If deviated, is wellbore plot_ included _ _ _ _ _ _ _ _ _ _ _ _ _ ...
Yes
9
Operator only affected part...... _ _ _
Yes
10
Operator hasappropriate bond in force _ _ _
Yes
Appr Date
11
Permit can be issued without Conservation order_ _ _ _ _
Yes
12
Permit can be issued without administrativeapproval- _ _ _ _ - _ - _
Yes
SFD 3/20/2018
13
Can permit be approved before 15-day wait.. ........ .. .... .. _ _
Yes
14
Well located within area and_strata authorized by Injection Order # (put 10# in. comments) (For_
NA
15
All wells within 114, mite-area-of review Identified (For service well only). _ _ _ _ _ _ _ _ _ _
.NA
16
Pre-produced injector; duration of pre production less than 3 months (For service well only) ..
NA
18
Conductor string provided . . . . . . . . . . . . .. . .................... . . . . _ _
NA-
COndoctofsetfor PBU 11-23_
Engineering
19
Surface casing protects all known USDWs .............................. .
NA
Surface casing set for PBU 11-23 _
20
CMT vol adequateto circulateon conductor & surf -csg _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
NA.
Surface casing set and fully cemented
21
CMT vol adequate to tie-in long string to surf csg _ _ _ _
NA
22
CMT will cover. all knownproductivehorizons_ ....... _
Yes
_ Productive, interval will be completed with cemented production. liner and perforated
23
Casing designs adequate for C. T, B & permafrost.. _ _ _ _ _ _
Yes
24
Adequate tankage, or reserve pit _ _ _
Yes
Rig has steel tanks; all waste to approved disposal wells.. _
25
If a r"ML has a 10-403 for abandonment been approved _ _ _ _ _
Yes
PTD 194-081,-Sundry 318-OT5...
26
Adequate wellbore separation proposed _
Yes
_ _ Antircollision analysis complete; major risk failures:_L2,08A-Sl@surf; 11-30A-SI@surf wl tt plug
27
If diverter required, does it meet regulations _ _
NA
_ .....
Appr Date
28
Drilling fluid program schematic & equip list adequate_ _ _ _ _ _ _ _ _ _
Yes
Max formation pressure is 3284 psig(7.6 ppg EMW ); will drill w/8.5-11.0 ppg EMW
VTL 3/21/2018
29
BOPEs,_dothey meet regulation _ _ - _ _ _ _ _ _ _ _ - _
Yes
30
BOPE_press rating appropriate; test to (put psig in comments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
_ MPSP is 2457 psig; will test 6OPs to 3500 psig _ _ _ _ .............. _
31
Chokemanifold complies w/API. RP-53 (May 84).. _ _ _ _ _ _ _ _ _ _ - - - _ _ _
Yes
32
Work will occur without operation shutdown _ - . - . - .
Yes
33
Is presence of H2S gas probable__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
_ _ _ _ H2S measures required
34
35
Mechanical condition of wells within AOR verified (Forservicewell only) _ _ _ _ _ _ _ ...NA
Permit can be issued w/o hydrogen sulfide measures
No.
_ . _ . _ .
_ _ _ _ DS 11 wells are H2S-bearing. H2S measures. are required.
Geology
36
Data.pfesented on potential overpressure zones ...... . ... . .... . . . . .
Yes
Planned drilling mud program (about 6.5 — 9.0. ppg). appears adequate to control operator's forecast
Appr Date
37
Seismic analysis of shallow gas. zones _ _ _ _ .. _ _ _
N-A
...... pore pressure_ gradient (about 7.6 ppg). Should higher pore pressures be encountered.
SFD 3/20/2018
38
Seabed .condition survey(if off-Shore) . . .. . .. . . . .................. . . . ..
NA
_ _ .. _ - - BP has immediate access to nearby fluid.mixing facilities.
39
Contact name/phone for weekly Progress reports_ [exploratory only] - - - - - - - - - - - - - ---
NA
.......
Geologic
Commissioner:
S
QT)
Date:
3 ev
Engineering
Commissioner: Date
C 3 "�9 !8
Public
oner�
C
Date
�
�/u,
�
71.1"