Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-029DATA SUBMITTAL COMPLIANCE REPORT 119/2019 Permit to Drill 2180290 Well Name/No. PRUDHOE BAY UNIT 11-23B C61- Operator BP EXPLORATION (ALASKA) INC. API No. 50-029.21610-02-00 MD 15157 TVD 8618 Completion Date 5/19/2018 Completion Status 1-0I1 Current Status 1-0I1 OC No REQUIRED INFORMATION / / Mud Log No ✓ Samples No Directional Survey Yes DATA INFORMATION List of Logs Obtained: MWD/ GR/ RES, MWD/ GR/ RES/ DEN/ NEU Well Log Information: Log/ Electr Data Digital Dataset Lo Lo Run Name Type Med/Frmt Number 9 g Scale Media No ED C 29527 Digital Data ED C 29527 Digital Data ED C 29527 Digital Data ED C 29527 Digital Data ED C 29527 Digital Data ED C 29527 Digital Data ED C 29527 Digital Data ED C 29527 Digital Data ED C 29527 Digital Data ED C 29527 Digital Data AOGCC Page 1 4 5 (Nom Master Well Data/Logs) Interval OHI Start Stop CH Received Comments 6430 15157 7/12/2018 _ Electronic Data Set, Filename: 11-23B _BHGE_LTK_MEM_FE Composite Drilling Data.las 6340 6520 7/12/2018 Electronic Data Set, Filename: 11- 23B_BHGE_ OTK(8.50)_Runo2_MEM _Madpass_ 6343-6478_Depth.las 7/12/2018 Electronic File: 11- 23B_BHGE_LTK_2MD_Memory Ddiling_Log.cgm 7/12/2018 Electronic File: 11 236_BHGE_LTK_2TVDss_Memory Drilling_Log.cgm 7/12/2018 Electronic File: 11- 23B_BHGE_LTK_5MD_Memory Drilling_Log.cgm 7/12/2018 Electronic File: 11- 23B_BHGE_LTK_5TVDss_Memory Ddlling_Log.cgm 7/12/2018 Electronic File: 11- 23B_BH GE_ OTK(8.50)_Run02_2MD_Mem_Mad pass_6382-6521.cgm 7/12/2018 Electronic File: 11- 23B BHGE_ OTK(8.50)_Run02_2TVDSS_Mem_ Madpass_4768-4850.cgm 7/12/2018 Electronic File: 11- 23B_BHGE_ OTK(8.50)_Run02_5MD_Mem—Mad pass_6382-6521.cgm 7/12/2018 Electronic File: 11- 231_BHGE_ OTK(8.50)_Run02_5TVDSS_Mem_ Madpass_4768-4850.cgm Wednesday, January 9, 2019 DATA SUBMITTAL COMPLIANCE REPORT 1/9/2019 Permit to Drill 2180290 Well Name/No. PRUDHOE BAY UNIT 11-23B Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21610-02-00 MD 15157 TVD 8618 Completion Date 5/19/2018 Completion Status 1-0IL Current Status 1-0I1 UIC No ED C 29527 Digital Data 7/12/2018 Electronic File: 11-23B_BHGE_LTK_FE Composite Drilling Data.dls ED C 29527 Digital Data 7/12/2018 Electronic File: 11- 236_BHGE_ OTK(8.50)_Run02_Mem_Madpass_ 4834-5078_Depth.dls ED C 29527 Digital Data 7/12/2018 Electronic File: 11- 23B_BHGE_LTK_2MD_Memory Drilling_Log.pdf ED C 29527 Digital Data 7/12/2018 Electronic File: 11- 23B_BHGE_LTK 2TVDss_Memory Drilling_Log.pdf ED C 29527 Digital Data 7/12/2018 Electronic File: 11- 23B_BHGE_LTK_5MD_Memory Drilling_Log.pdf ED C 29527 Digital Data 7/12/2018 Electronic File: 11 23B_BHGE_LTK_5TVDss_Memory Drilling_Log.pdf ED C 29527 Digital Data 7/12/2018 Electronic File: 11- 236_BHGE_ OTK(8.50)_Run02_2MD_Madpass_ ME M_6343-6478_Log.pdf ED C 29527 Digital Data 7/12/2018 Electronic File: 11- 23B_BHGE_ OTK(8.50)_Run02_2TVDSS_Madpa ss_MEM_4768-4848_Log.pdf ED C 29527 Digital Data 7/12/2018 Electronic File: 11- 23B_BHGE_OTK(8.50)_Run02_5MD_Madpass_ MEM_6343-6478_Log.pdf ED C 29527 Digital Data 7/12/2018 Electronic File: 11- 238_BHGE_ OTK(8.50)_Run02_5TVDSS_Madpa ss_MEM_4768-4848_Log. pdf ED C 29527 Digital Data 7/12/2018 Electronic File: 11-23B_BHGE_Final Survey Report.pdf ED C 29527 Digital Data 7/12/2018 Electronic File: 11-23B_BHGE_Final Survey Report.txt ED C 29527 Digital Data 7/12/2018 Electronic File: 11-23B_BHGE_ FinalSurveys.csv ED C 29527 Digital Data 7/12/2018 Electronic File: 11-23B_BHGE_FinalSurveys.xls Log C 29527 Log Header Scans 0 0 2180290 PRUDHOE BAY UNIT 11-23B LOG HEADERS Log C 29528 Log Header Scans 0 0 2180290 PRUDHOE BAY UNIT 11-23B PB1 LOG HEADERS AOGCC Page 2 0l' 5 Wednesday, January 9, 2019 DATA SUBMITTAL COMPLIANCE REPORT 1/9/2019 Permit to Drill 2180290 Well Name/No. PRUDHOE BAY UNIT 11-23B Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21610-02-00 MD 15157 TVD 8618 Completion Date 5/19/2018 Completion Status 1-0I1- Current Status 1-0I1 UIC No ED C 29528 Digital Data 6430 13750 7/12/2018 Electronic Data Set, Filename: 11-236 PB1 _BHGE_LTK_MEM—FE Composite Drilling Data.las ED C 29528 Digital Data 6340 6520 7/12/2018 Electronic Data Set, Filename: 11- 23B P B 1 _B H G E_OTK( 8.50 )_Run 02_MEM Ma d p ass_6343-6478_Depth.las ED C 29528 Digital Data 7/12/2018 Electronic File: 11-23B PB1 _BHGE_LTK_2MD_Memory Drilling_Log.cgm ED C 29528 Digital Data 7/12/2018 Electronic File: 11-23B PB1 BHGE_LTK_2TVDss_Memory Drilling_Log.cgm ED C 29528 Digital Data 7/12/2018 Electronic File: 11-23B PB1 BHGE_LTK_5MD_Memory Drilling_Log.cgm ED C 29528 Digital Data 7/12/2018 Electronic File: 11-23B PB1 _BHGE_LTK_5TVDss_Memory Drilling_Log.cgm ED C 29528 Digital Data 7/12/2018 Electronic File: 11- 23B BHGE_ OTK(8.50)_Run02_2MD_Mem_Mad pass_6343-6478.ogm ED C 29528 Digital Data 7/12/2018 Electronic File: 11- 23B_BHGE_ OTK(8.50)_Run02_2TVDSS_Mem_ Madpass_4768-4848.cgm ED C 29528 Digital Data 7/12/2018 Electronic File: 11- 236_BHGE_OTK(8.50)_Run02_5MD_Mem_Mad pass_6343-6478.cgm ED C 29528 Digital Data 7/12/2018 Electronic File: 11- 23BBHGE_OTK(8.50)_Run02_5TV DSS_Mem_ Madpass__4768-4848.cgm ED C 29528 Digital Data 7/12/2018 Electronic File: 11-23B PB1 _BHGE_LTK_FE Composite Drilling Data.dls ED C 29528 Digital Data 7/12/2018 Electronic File: 11- 23BP81_BHGE_ OTK(8.50)_Run02_Mem_Madpa ss_6343-6478_Depth.dls ED C 29528 Digital Data 7/12/2018 Electronic File: 11-23 PB1 _BHGE_LTK_2TVDss_Memory Drilling_Log.pdf AOGCC Page 3 of 5 Wednesday, January 9, 2019 DATA SUBMITTAL COMPLIANCE REPORT 119/2019 Permit to Drill 2180290 Well Name/No. PRUDHOE BAY UNIT 11-23B Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21610-02-00 MD 15157 TVD 8618 Completion Dale 5/19/2018 Completion Status 1-0I1- Current Status 1 -OIL UIC No ED C 29528 Digital Data 7/12/2018 Electronic File: 11-23B PB1_BHGE_LTK_2MD_Memory Drilling_Log.pdf ED C 29528 Digital Data 7/12/2018 Electronic File: 11-23B PB1_BHGE_LTK_5MD_Memory Ddiling_Log.pdf ED C 29528 Digital Data 7/12/2018 Electronic File: 11-23B PB1_BHGE_LTK_5TVDss_Memory Drilling_Log.pdf ED C 29528 Digital Data 711212018 Electronic File: 11- 23BPB1_BHGE_OTK(8.50)_Runo2_2MD_Madpa ss—MEM — 6343-6478 — Log.pdf ED C 29528 Digital Data 7/12/2018 ElectronicFile: 11- 23BPB1_BHGE_ OTK(8.50)_Run02_2TVDSS_Ma dpass_MEM _4768-4848_Log.pdf ED C 29528 Digital Data 7/12/2018 Electronic File: 11- 23BPB1_BHGE_ OTK(8.50)_Run02_5MD_Mediae ss—MEM 6343-6478—Log.pdf ED - C 29528 Digital Data 7/12/2018 Electronic File: 11- 23BPB1_BHGE_OTK(8.50)_Run02_5TVDSS_Ma dpass_MEM _4768-4848_Log.pdf ED C 29528 Digital Data 7/12/2018 Electronic File: 11-23BPB1_BHGE_Final Survey Report.pdf ED C 29528 Digital Data 7/12/2018 Electronic File: 11-23BPB1_BHGE_Final Survey Report.txt ED C 29528 Digital Data 7/12/2018 Electronic File: 11- 23BPB 1 _BHG E_ FinalSurveys.csv ED C 29528 Digital Data 7/12/2018 Electronic File: 11- 238 P B 1 _B H G E _Fi n a l S u rveys. xl s Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED AOGCC Pagc 4 of Wednesday, January 9, 2019 DATA SUBMITTAL COMPLIANCE REPORT 1/912019 Permit to Drill 2180290 Well Name/No. PRUDHOE BAY UNIT 11-23B Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21610-02-00 MD 15157 TVD 8618 Completion Date 5/19/2018 Completion Status 1 -OIL Current Status 1 -OIL LIC No Completion Report 0 Directional / Inclination Data O Mud Logs, Image Files, Digital Data Y /6 Core Chips Y / Production Test Information Y /® Mechanical Integrity Test Information Y/ NA Composite Logs, Image, Data Files 0 Core Photographs Y /� Geologic Markers/Tops O Daily Operations Summary 0 Cuttings Samples Y / l-/ Laboratory Analyses Y /' V COMPLIANCE HISTORY Completion Date: 5/19/2018 Release Date: 3/28/2018 Description Comments: Compliance Reviewed By: Date Comments Date: lh l i I AOGCC Page 5 of 5 Wednesday, January 9, 2019 Martin, Teddy J (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Tuesday, July 24, 2018 3:18 PM To: AOGCC Reporting (DOA sponsored) Subject: POP PBU 11-23B / PTD # 218-029 Hello, Please reference the following well: Well Name: PBU 11-23B Permit #: 218-029 API #: 50-029-21610-02-00 Date of Test: 6118118 Type of Test: IPT (Initial Production Test) Choke Size: 90 Choke Unit: Production Method: Gas Lift Duration (Hours Tested): 12 Top Reference (Top Perf MD): 11630' Bottom Reference (Bottom Pert MD): 14885' Tubing Flowing (Pressure): 186 Casing Pressure: 930 Total Test Rate (O, G, W): 586 / 850 / 129 24 -Hour Rate (O, G, W): 1171 / 1700 / 258 Gravity (Oil, API): N/A GOR (Gas -Oil Ratio): 1452 This well began Production on Method of Operations on this date: June 16, 2018 RBDMS�,.UG 0 6 2018 BAF�UGHES ER ® PRINT DISTRIBUTION LIST a GE company COMPANY BP Exploration Alaska Inc. WELL NAME 11-23B FIELD Prudhoe Bay Unit CD/DVDFINAL COUNTY PRUDHOE BAY PRELIM BHI DISTRICT Alaska SURVEY AUTHORIZED BY Paul Canizares EMAIL Paul. Can izares@bhoe.com 218029 29 52 7 ase sign and return one copy of this transmittal form to: Exploration (Alaska) Inc. :rotechnical Data Center, LR2-1 ) E. Benson Blvd. Anchorage, Alaska 99508 or LOG TYPE GR-RES-DEN-NEU LOG DATE May 16, 2018 TODAYS DATE July 11. 2018 Revision STATUS Final Replacement: No Details: Rev. Requested by: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION 4 t BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glnssmaker & Peggy O'Neil 900 E. Benson Blvd. Anchorage, Alaska 995M 2 ConocoPhillipe Alaska Inc. Attn: Ricky Elgarico ATO 3-J4< 700 G Street Anchorage. AK 99510 3 Lynda M. Vaskell and/or Lisa Boggs C Street, Suite 505 forage. AK 99503 e of Alaska - AOGCC I: Natural Resources Technitian W. 7th Ave, Suite 100 horage, Alaska 99501 2 - Division of Oil & Gas I: Garret Brown West 7th Avenue, Suite 1100 horaee. Alaska 99501 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 FIELDI FINAL CD/DVDFINAL PRELIM LOGS I (las, dlis, PDF, META, I SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES # OF COPIES 0 1 Com] AOGCC TOTALS FOR THIS PAGE: 0 0 4 0 0 BAjCER 0PRINT DISTRIBUTION LIST 29528 Ise sign and return one copy of this transmittal form to: Exploration (Alaska)Inc. rotechnical Data Center, LR2-1 ) E. Benson Blvd. Anchorage, Alaska 99508 or LOG TYPE GR-RES-DEN-NEU LOG DATE May 11, 2018 TODAYS DATE July 11, 2018 Revision STATUS Final Replacement: No Details: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION I BP North Slope. EOA, PROC, PRB-20 (Office 109) D&C Wells Project Aides Aft: Benda Glassmnkcr & Peggy O'Neil 900 E. Benson Blvu. Anchorage, Alaska 99508 Rev. Requested by: FIELD/ FINALCD/DVD UGHES 1 PRELIM LOGS (las, tills, PDF, META, a GE company REPORT COMPANY BP Exploration Alaska Inc. WELL NAME 11-23BPB1 # OF PRINTS # OF COPIES FIELD Prudhoe Bay Unit 700 G Street COUNTY PRUDHOE BAY BHI DISTRICT Alaska AUTHORIZED BY Paul Canizares EMAIL PauLCangar�om 29528 Ise sign and return one copy of this transmittal form to: Exploration (Alaska)Inc. rotechnical Data Center, LR2-1 ) E. Benson Blvd. Anchorage, Alaska 99508 or LOG TYPE GR-RES-DEN-NEU LOG DATE May 11, 2018 TODAYS DATE July 11, 2018 Revision STATUS Final Replacement: No Details: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION I BP North Slope. EOA, PROC, PRB-20 (Office 109) D&C Wells Project Aides Aft: Benda Glassmnkcr & Peggy O'Neil 900 E. Benson Blvu. Anchorage, Alaska 99508 Rev. Requested by: FIELD/ FINALCD/DVD FINAL 1 PRELIM LOGS (las, tills, PDF, META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) ATO 3-344 # OF PRINTS # OF COPIES # OF COPIES # OF COPIES 4 IG 4 4 4 4 2 ComanPhillips Alaska Inc. 0 0 1 0 0 Attn: Ricky Elgarico ATO 3-344 700 G Street Anchorage, AK 99510 RECEIVED 3 ExxonMobil, Alaska 0 0 i0 0 Attn: Lynda M. Yaskell and/or Lisa Boggs 3201 C Street, Suite 505 AO G C C Anchorage, AK 99503 4 State of Alaska -AOGCC 0 0 1 0 0 Attn: Natural Resources Technician 333 W. 7th Ave, Suite 100 Anchoraee, Alaska 99501 DNR - Division of Oil & Gas *** Attn: Garret Brown 550 West 7fh Avenue. Suite 1100 Anchorage, Alaska 99501 *** Stamo "confidential" on all material deliver to DNR BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 0 4 0 0 STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMIS( I WELL . JMPLETION OR RECOMPLETION REPOK. AND LOG RECEIVED la. Well Status: Oil 0 . Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ Well Class. - 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One 11b. Development 0 Exploratory❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 5/19/2016 216-029 ' 3. Address: T Date Spudded: 15. API Number P.O. Box 196612 Anchorage, AK 99519-6612 4/30/2018 50-029-21610-02-00 - 4a. Location of Well (Governmental Section): 8. Date TD Reached. 16- Well Name and Number: 5/15/2018 PBU 11.238 Surface', 1096' FSL, 364' FEL, See. 28, T11 N, R15E, UM 9 Ret Elevations KB 74 60 17. Field/Pool(s): Top of Productive Interval: 1655FSL, 3188' FEL, Sec. 21, T11 N, R15E, UM GL 27.90 ' BF 28.45 PRUDHOE BAY, PRUDHOE OIL 10. Plug Back Depth(MD/TVD): 18. Property Designation Total Depth: 5206' FSL, 4292' FEL, See. 21, T11N, R15E, UM • 15063'/ 8640' ADL 028325 8 028322 4b, 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 707156 • y- 5952811 Zone - ASP 4 . 15157'/ 8618' 70-054 TPI: x- 704180 y- 5958570 Zone - ASP 4 12. SSSV Depth (MDfTVD): PO Thickness of Permafrost MD/rVD: Total Depth: x- 702951 y- 5962089 Zone - ASP 4 None 1900' Approx.) S. Directional or Inclination Survey: Yes 0 (attached) No ❑ 13. Water Depth, if Offshore: 21_ Re-drillll-aterel Top Wndow Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) MD/TVD: - 6443'/ 4902' 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, rasing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD/GR/RES, MWD /GR/RES /DEN /NEU 23. CASING, LINER AND CEMENTING RECORD CASING I WT, PER I FT. GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H40 48' 128' 48' 128' 30" 1450# Poleset 13-3/8" 68#/72# K -55L-90 48' 2780' 48' 2512' 17-1/2" 3200 sx CS Ill, 900 sx CS II 9-5/8" 47# L-60 46' 6443' 46' 4902' 12-1/4" 500 sx Class'G', 300 sx CS 1 7" 26# L-90 6286' 10615' 4810' 8314' &1/2"x9-7/8" 488 sx Class'G' 4-1/2" 12.6# 13Ci85 10441' 15155' 8164' 8618' 6-1/8" 552 sx Class 'G' 24. Open to production or injection? Yes 0 . No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): GRADE DEPTH SET (MD) PACKER SET (MD/TV 4-1/2" 12.6# 13Cr85 10446' 10327'/ 8088' 2-3/4" Gun Diameter, 6 spf 5/18/2018 11630'-12100' 8775'-8767' 26, ACID, FRACTURE, CEMENT SQUEEZE, ETC. 12200'- 12500' 8765'- 8752' Was hydraulicfmctunng used during completion? Yes ❑ No 0 Per 20 AAC 25.263 (i)(2) attach electronic and printed information13970' 12520'-12680' 8751'-8744' COMPLETION 12700'- 13050' 8743' - 8731' 13200'- 13840' 8726' - 8705' D TE �j - 14630' 8700'- 8674' DEPTH INTERVAL (MDI AMOUNT AND KIND OF MATERIAL USED 14760' - 14885' 8669' - 8883' VE IED 2200' Freeze Protect w/ 151 Bbls Diesel 27, PRODUCTION TEST Date First Production: Nol on Production Method of Operation (Flowing, gas lift. etc): N/A Date of Test: Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke S've Gas -Oil Ratio: Test Period Flow Tubing Press Casino Press: Calculated 24 Hour Rate —110 Oil -Bbl: Gas -MCF: Wader -Bbl: Oil Gravity - API foom): Foam 10107 Revised! 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only ROMM JUN T-9 Z018 M&,J?69jV8VVF /11 28. CORE DATA I Conventional Corals) Yes ❑ No 0 ( Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No 0 ' Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 11315' 8741' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071, Ugnu 6511' 4944' West Bak 8256' 6332' Colville Mudstone 8776' 6767' HRZ 10377' 8109' LCU / Shublik 10614' 8313' Sadlerochit - Zone 4B 10639' 8334' 42SB-Zone 4A 10721' 8403' CGL - Zone 3 10804' 8468' Base of CGL - Zone 2C 10862' 8510' 23SB - Zone 2B 10990' 8595' 21TS - Zone 2A 11113' 8662' Zone 1 B 11238' 8716' TDF - Zone 1A 11315' 8741' Zone 1B (Invert) 15115' 8628' Formation at total depth: Zone 1B (From Base) 15115' 8628- 31. List of Attachments: LOT / FIT Summary, Summary of Daily Drilling Reports, Surveys, Cement Reports, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070, 32. 1 hereby certify that the foregoing is true and comect to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Gorham, Bradley M Authorized Title: SIM S tial Contact Email: Bradley. Gorham@bp.com Authorized Signature:% Date: I Contact Phone: 907-564-4649 IN RUCTIONS General: This form is designetl for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed desorption and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production orwell test results. Form 10407 Revised 5/2017 Submit ORIGINAL Only TRS= McEVOY VWELL EAD= CNV ACTUATOR= ---- BKRC OKB. — 57- TREF REFB -EV = 74.80' BF. ELEV = 28.46 KOP= 1100' Max Angle = -------._ 107'@ 15157' DatxmMD= _..._---- 10639' Datwn TVD= 825W SS 13-3/8" CSG, 728, L-80, D = 12.347' 2763' Minimum ID = 3.725" @ 10430' 4-1/2" HES X NIPPLE JTOPOF4-1/2"LHRH 10441' 2' TBG, 12.60, 13CR-85 VAM TOP.10446' 52 bpf, D = 3.958" 7" LNR, 264, L-80 VAIVTOP FrBTC-M, 10615' .0383 bpf, D = 6276" PERFORATION SLRAAARY REF LOG: BKR DWING MWD ON 05/16/18 ANGLEAT TOP PEW 92" 1'Q 11630' Note: %far b Production DB for historical perf data SIZE SIFF KrERVAL Opn/Sgz SHOT SOZ 2-314' 6 11630-12100 O 05/18/18 BW 2-314" 6 122OD- 12500 O 05/18/18 42 2-3/4" 6 12520-12680 O 05/18/18 4 2.9/4" 6 12700-13050 O 05/18/18 BK 2-314" 6 13200- 13840 O 05/18/18 33 2-3/4" 6 13970 - 14630 O 05/18/18 2 2314" 6 14760- 14885 O 05/18/18 BK air. bpf, D = 3.958- 11-23B [SAFETY NOTES: WELL ANGLE> 70° @ 11250'. MAX DL.S:1T @ 11502'.—CHROMETBG 8 LNR"' (4-1/2"HES X NP, D=3.813" I ST MD TVD DEV TYPE VLV LATCH I PORT DATE 6 4413 3573 50 KBG2 SHEAR BW - 05119118 5 6891 5213 42 KBG-2 DMV BK 0 05/19/18 4 7755 5915 34 KBG-2 Dk1V BK 0 05/19/18 3 8287 6358 33 KBG-2 Dk1V BK 0 05119118 2 9276 7185 33 KBG-2 OMY BK 0 05119/18 1 10140 7908 33 KBG-2 DMV BK 0 05/19/18 X 7' WFD UP w CGP, D = 6.19" IMMLOIlTVwmw(1/-238) 6443'-6457' 10327' I -j7" X 4-1/2" HES TNT PKP D-3.856" 10361" 4-112" FES X NP, D = 3.813' 10430' 4-12" FES XN NP, —ID—= -3-72-5--1 10441' 7"X5'WFDLTPwrrEBACK SLEEVE& VVFD HGP, D = 4.330- 110416' H4-1/2" WLEG, 10 = 3.958" 10461' 5" X 4-12" XO. D = 3.934- DATE REV BY COLU31ITS DATE REV 8Y COMMENTS 1986 ORIGINAL COMPLETION 10/15/95CT SIDETRACK 0 5120118 P-272 SIDEfRACK(11-238) 05!21118 JMD I DRLG HO CORRECTIONS 0521!18 BG/JMD IFINIALODEAPPROVAL PRUDHOE BAY UPIT WELL: 11-23B PEFUT No: '218-029 AR W: 50-029-21610-02 T11 K R15E 1096' FSL & 364' FEL BP Exploration (Alaska) BP AMERICA LOT / FIT Summary Well Name: 11-23BPB1 Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD -Ft) (TVD -Ft) (ppg) (psi) (BHP) (psi) (ppg) 05/01/18 FIT 6,443.45 4,901.45 9.80 730.00 3,225.06 1267 Page 1 of 1 Page 1 of 1 BP AMERICA LOT / FIT Summary Well Name: 11-23B Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (pp) (psi) (BHP) (psi) (ppg) 05/09/18 FIT 10,615.45 8,314.45 8.50 650.00 4,321.32 10.00 Page 1 of 1 North America - ALASKA - Blo Page 1 of 31 Operation Summary Report Common Well Name'. 11-23 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/2412018 End Date: 5/16/2018 X3 -018Y4 -C. (6,086,993.00) Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud Date/Tlme: 7/11/1986 12:00:OOAM Rig Release: 5/20/2018 Rig Contractor. PARKER DRILLING CO. SPUOI: USA00001229 Active datum: 11-23B Actual @j74.60usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) _ _ (usft) 4/24/2018 00:00 - 01:00 1.00 MOB P 0.45 PRE BEGIN RE-ENTRY EVENT WITH PARKER RIG 272 AT 00:00 ON 4/24/18 4/26/2018 00:00 - 02:00 2.00 MOB N RIG PROJECTS - REPLACEACTIVE HEADER IN PIT ROOM WITH FLANGED STYLE FOR EASY SECTION REPLACEMENT IN FUTURE - CHANGE UPPER RAMS FROM SMALL VBRS TO LARGE VBRS FOR 11-238 PROGRAM - PREVENTATIVE MAINTENANCE, CLEANING AND PAINTING AROUND RIG 0.45 PRE RIG STAGED ON DS04 ACCESS ROAD WHILE WAITING ON COMPLETION OF 11-23 WELUPRE-RIG WORK - LEVEL PAD FOR RIG FOOTPRINT - TOTAL OF 44 HOURS WAITING FOR PRE -RIG WELLAND PAD PREP - WARMUP TIRES AND MOVING SYSTEM Printed 6/7/2018 4:43:50PM *All depths reported in Drillers Depths' GENERAL RIG DOWN OPERATIONS ON 04-51 THROUGHOUT RIG - RIG DOWN RIG FLOOR, SECURE TOP DRIVE, BRIDLE UP 01:00 - 01:30 0.50 MOB P 0.45 PRE MOVE HAUNCH TO STORAGE POSITION AND SKID RIG FLOOR TO RIG MOVE POSITION 01:30 - 02:30 1.00 MOB P 045 PRE LOWER DERRICK TO HEADACHE RACK -404 KLBS 02:30 - 0330 1.00 MOB P 0.45 PRE CONTINUE RIG DOWN OPERATIONS THROUGHOUT RIG RIG DOWN ALL INNER -CONNECTS UNPLUG ELECTRICAL INNER -CONNECTS _ WARM UP TIRES 0330 - 0600 2.50 MOB P 0.45 PRE MOVE RIG TO DS11 - SPLIT MODULES AND PULL OFF DS04-51 - MOVE RIG DOWN DS04 ACCESS ROAD - STAGE RIG ON DS04 ACCESS ROAD WHILE WAITING ON COMPLETION OF 11-23 WELUPRE-RIG WORK 0600 - 0000 18.00 MOB N 0.45 PRE RIG STAGED ON DS04 ACCESS ROAD WHILE . WAITING ON COMPLETION OF 11-23 WELUPRE-RIG WORK -OPS AND WELLS GROUP WORKING TO COMPLETE DISCONNECT OF FLOWUNE, PULL NEIGHBOR WELLHOUSE HANDRAILS, INSTALL FLOORING KIT, LEVEL PAD FOR RIG FOOTPRINT _ 4/25/2018 0000 - 0000 24.00 MOB N 0.45 PRE RIG STAGED ON DS04 ACCESS ROAD WHILE WAITING ON COMPLETION OF 11-23 WELUPRE-RIG WORK - OPS AND WELLS GROUP WORKING TO COMPLETE DISCONNECT OF FLOWLINE, PULL NEIGHBOR WELLHOUSE HANDRAILS, INSTALL FLOORING KIT, LEVEL PAD FOR RIG FOOTPRINT 4/26/2018 00:00 - 02:00 2.00 MOB N RIG PROJECTS - REPLACEACTIVE HEADER IN PIT ROOM WITH FLANGED STYLE FOR EASY SECTION REPLACEMENT IN FUTURE - CHANGE UPPER RAMS FROM SMALL VBRS TO LARGE VBRS FOR 11-238 PROGRAM - PREVENTATIVE MAINTENANCE, CLEANING AND PAINTING AROUND RIG 0.45 PRE RIG STAGED ON DS04 ACCESS ROAD WHILE WAITING ON COMPLETION OF 11-23 WELUPRE-RIG WORK - LEVEL PAD FOR RIG FOOTPRINT - TOTAL OF 44 HOURS WAITING FOR PRE -RIG WELLAND PAD PREP - WARMUP TIRES AND MOVING SYSTEM Printed 6/7/2018 4:43:50PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: 11-23 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 424/2018 End Date: 5/16/2018 Project: PBU site, 11 Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 12:00:OOAM Rig Contractor: PARKER DRILLING CO. Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Page 2 of 31 AFE No X3 -018Y4 -C: (6,086 993,00 ) Rig Release: 5/202018 BPUOI: USA00001229 Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ lush) i _ 0200 - 0500 3.00 MOB P 045 PREOMVE ALL MODULES FROM DSO4 ACCESS Printed 60/2018 4:43:50PM `All depths reported in Drillers Depths' ROAD TO DS11 - TOTAL RIG MOVE LENGTH = -3 MILES - SIMOPS: RIG LOADER PLACING RIG MATS AND SET WELLHOUSE OVER WELL -MOVE MODULES INDIVIDUALLY AROUND FS2 WITH CENTRAL POWER STATION SPOTTERS 05:00 - 0700 2.00 MOB P 0.45 PRE SPOT DRILL MODULE OVER WELL 23. MATE MUD MODULE AND UTILITY MODULE UP AGAINST DRILL MODULE - SHIM AND SECURE MODULES 07.00 - 0900 2.00 MOB P 045 PRE GENERAL RIG UP OPERATIONS THROUGHOUT RIG -RIG UP INTERCONNECTS - COMPLETE CHECKLIST FOR RAISING MAST - WELLS SUPPORT CREW ON LOCATION TO SPOT FLOWBACKTANKAND RIG UP HARDLINE FROM TANK TO WELLHOUSE -SPOT CUTTING_ _S BOX_ 0900 - 0930 0.50 MOB P 0.45 PRE RAISE MAST -540 KLBS OFF HEADACHE RACK 09:30 - 11:00 1.50 MOB P 0.45 PRE SKID RIG FLOOR INTO DRILLING POSITION. . POSITION CATTLE CHUTE. RAISE PIPE CAT - MONITOR TREE FOR PRESSURE BUILDUP ABOVE TWC AFTER HEATERS HAVE BEEN ACTIVATED IN WELLHOUSE PERFORM RIG BLACKOUT TEST (PASS) 11:00 - 15:30 4.50 MOB P 0.45 PRE GENERAL RIG UP OPERATIONS - RIG UP RIG FLOOR, MODULE ROOFS, & INTERCONNECTS - BRIDLE DOWN, RIG UP BLOCKS AND TOP DRIVE, CALIBRATE BLOCKS - OUADCO REP ON LOCATION TO CALIBRATE PVT, FLOW SENSORS AND GASWATCH - FILL IA WITH 5 BBLS 6.8 PPG DIESEL FROM FREEZE PROTECT TANK. ESTABLISH BEGINNING OF MONITORING PERIOD TO ESTABLISH KWF ASA NIPPLE DOWN BARRIER AT 15:30. MAINTAIN CONTINUOUS HOLE FILL WITH GRAVITY FEED FROM 250 BELS DIESEL LOADED IN FLOWBACK TANK. MONITOR GAINSILOSSES USING TOTCO SENSOR AND MANUAL TANK STRAPS EVERY 1/2 HOUR - PERFORM RIG READINESS WALKAROUND Printed 60/2018 4:43:50PM `All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 3 of 31 Common Well Name: 11-23 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date 4/24/2018 End Date'. 5/16/2018 X3 -018Y4 -C: (6,086,993.00 ) Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud Date/Time'. 7/11/1986 12:00 OOAM Rig Release: 5/20/2018 Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To Hrs Task i (hr) 15:30 - 23:30 8.00 RIGU 23:30 - 0000 0.50 4/27/2018 0000 - 0300 3.00 0300 - 06:00 3.00 06 00 - 07:30 1.50 Code NPT i Total Depth N 0.45 RIGU P 045 RIGU P 0.45 RIGU P 0.45 BOPSUR P 0.45 BPUOI: USA00001229 Phase Description of Operations PRE MONITOR IA WITH CONTINUOUS DIESEL HOLE FILL - CODED AS NON-PRODUCTIVE TIME, BECAUSE EXTRA BARRIER TESTING AND ESTABLISHMENT WORK REQUIRED FOLLOWING LAST MINUTE WELL PREP - OCN #1 REQUIRES MONITOR KWF FOR 3X EXPECTED TIME TO NIPPLE DOWN TREE AND NIPPLE UP ROPE (12 TOTAL MONITORING HOURS) �- NO GAINS/LOSSES OBSERVED IN FLOWBACK TANK INDICATING IA FLUID REMAINING LEVELAT WELLHEAD SIMOPS: - CHANGEOUT SAVER SUB TO 5" AND CHANGE IBOP (TO REPLACE FAILED STRINGSENSE) - PICKUP 5" DRILLPIPE WITH OFFLINE EQUIPMENT - PRESSURE TEST TWC FROM BELOW WITH DIESEL TO 3500 PSI HIGH FOR 5 MIN (PASS), NO PRESSURE OBSERVED ON THE OA DURING TEST HOLD TABLE TOP RIG EVACUATION DRILL AND AAR WITH WOODS' CREW + PRE -SPUD MEETING - HOLD PRESPUD WITH LYLE BUCKLER'S CREW DURING PRETOUR MEETING PRE PREPARE TO NIPPLE DOWN TREE -SUCK OUT TREE - GATHER TOOLS AND EQUIPMENT PRE NIPPLE DOWN TREE - BLEED OFF HANGER VOID AND CONTROL LINES - BREAK BOLTS AND REMOVE TREE -CLEAN HANGER AND INSPECT THREADS, INSTALL CROSSOVER WITH 9-3/4 TURNS - TERMINATE CONTROL LINES - FUNCTION _ALL _LOCK DOWN SCREWS PRE NIPPLE UP 13-5/8" HIGH PRESSURE RISER AND BOP STACK - ANNULAR, 4-1/2" X 7" VBR IN UPPER RAMS, BLIND/SHEAR RAMS IN MIDDLE RAMS, MUD CROSS, 2-7/8" X 5" VBR IN LOWER RAMS - TORQUE FLANGES TO SPEC -SECURE WITH TURNBUCKLES - INSTALL FLOW LINE AND FLOW NIPPLE PRE RIG UP TO TEST ROPE - MAKE UP TEST JOINTS AND TEST MANIFOLD ON RIG FLOOR Printed 6/7/2018 4:43:5OPM *All depths reported in Drillers Depths" Common Well Name. 11-23 Event Type. RE-ENTER- ONSHORE (RON) Project: PBU Rig Name/No.: PARKER 272 North America - ALASKA- BP Page 4 of 31 Operation Summary Report AFE No Start Date. 4/24/2018 End Date: 5/16/2018 X3 -018Y4 -C (6,086,993.00) Site: 11 Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To Him Task Code NPT (hr) 07:30 - 18:30 11.00 BOPSUR P 1830 - 2200 3.50 WHSUR P 2200 - 2230 0.50 CASING P 22:30 - 00:00 1.50 CASING P I I 4/28/2018 0090 - 02'.30 2.50 CASING P 02.30 - 03'.30 1.00 CASING P 03:30 - 05:00 1.50 CASING P 0500 - 0600 1.00 CASING P BPUOI: USA00001229 Total Depth Phase Description of Operations _ (usft) 0.45 PRE PRESSURE/FUNCTION TEST BOPE TO 250 PSI LOW AND 3500 PSI FOR 5 MIN EACH - TEST WITH 4',5' AND 7" TEST JOINTS - 1 FAILURE, VALVE 15 ON THE CHOKE MANIFOLD, REBUILD VALVE ON RIG AND RETEST (FAILED), CHANGE OUT VALVE AND RETEST(PASS) - TEST LEL, 112S, PVT AND FLOW SHOW ALARMS -ALL TESTS CHARTED, SEE ATTACHED BOP TEST CHARTS - TEST WITNESS WAIVED BY AOGCC REP BRIAN BIXBY 6,452.45 PRE PULLTWC - PICK UP AND SET DUTCH RISER - RIG UP LUBRICATOR AND TEST TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN -PULL TWC _ - RIG DOWN AND LAY DOWN LUBRICATOR 6,452.45 DECOMP SERVICETOPDRIVE 6,452.45 DECOMP RIG UP TO CIRCULATE OUT DIESEL - PRESSURE TEST SURFACE LINES, OBSERVE MULTIPLE LEAKS AT VALVES AND HOSES IN SURFACE LINES - REPAIR VALVES AND HOSE CONNECTIONS ON SURFACE LINES 6,45245 DECOMP CIRCULATE OUT DIESEL FREEZE PROTECT AND DISPLACE WELL TO NEW 9.8 PPG BRINE - PRESSURE TEST SURFACE LINES TO 4500 PSI HIGH (PASS) - PUMP 40 BBL BARACLEAN PILL FOLLOWED BY 460 BBL OF 9.8 PPG BRINE AT 120° F - 6 - 7 BPM, 800 - 1000 PSI, 120 - 150 PSI ON HARDLINE OUT TO TIGER TANK (TRACK BBL IN/OUT) SIMOPS: - RIG UP DOYON CASING EQUIPMENT - RIG UP SLB CONTROL LINE SPOOLER 6452.45 DECOMP PULL TUBING HANGER TO RIG FLOOR - MAKE UP CROSSOVER TO LANDING JOINT, RUN IN THE HOLE AND SCREW INTO THE TUBING HANGER - CAMERON REP ON LOCATION TO BACKOUT LOCK DOWN SCREWS -104 KLBS TO PULL HANGER OFF SEAT AND PULL TO RIG FLOOR (AS CALCULATED, NO OVERPULL) 8,452.45 DECOMP CIRCULATE BOTTOMS UP - CHANGE OUT O-RING IN VIBRATING HOSE TO RIG FLOOR AT START OF CIRCULATING - 640 GPM, 775 PSI -MONITOR WELL FOR 10 MIN (STATIC) 6,452.45 DECOMP COMPLETE RIG UP TO LAYDOWN TUBING WITH DOYON CASINGAND SLB SPOOLERS - MAKE UP FOSV CROSSOVER, HOLD PJSM - CIRCULATION OVER TOP OF WELL CONFIRM 9.8PPG FLUID COLUMN IS STATIC Panted 6/7/2018 4.43:5oPM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 5 of 31 Common Well Name: 11-23 CUT AT 6452' MD TO 6077' MD (6 JOINTS) AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date'. 4/24/2018 End Date'. 5/1612018 X3 -018Y4 -C: (6,086,993.00 ) Project: PBU Site: 11 SUGGESTING BANDS ARE NO LONG Rig Name/No.: PARKER 272 Spud Date/Time. 7/11/1986 12.00:OOAM Rig Release: 512012018 Rig Contractor. PARKER DRILLING CO. WITH TUGGER AND NYLON STRAPS. SLB BPUOI: USA00001229 Active datum: 11-23B Actual @74.60us8 (above Mean Sea Level) TO SPOOL UP LINES Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ _ (usfl) . LINES INDIVIDUALLY FROM TUBING 06:00 - 07:30 1.50 CASING P 6,452.45 DECOMP LAY DOWN 4-1/2", 12.6#, NSCT TUBING FROM 07:30 - 09:00 1.50 CASING N 0900 - 1900 10.00 CASING P 19.00 - 21.00 2.00 CASING P 21.00 - 00'.00 3.00 CASING P 4/29/2018 00:00 - 0230 2.50 CASING P Printed 6(7/2018 443'.50PM 'All depths reported in Drillers Depths" CUT AT 6452' MD TO 6077' MD (6 JOINTS) - REMOVE ONE SS BAND PER JOINT ON FIRST 8 JOINTS, NO CLAMPS - ON STH JOINT, WEIGHT OF DUAL CONTROL LINES IS OBSERVED TO SAG DOWNHOLE SUGGESTING BANDS ARE NO LONG SECURING CONTROL LINES TO TUBING - UNSUCCESSFULLY ATTEMPT TO PULL LINES WITH TUGGER AND NYLON STRAPS. SLB SPOOLING UNIT NOT POWERFUL ENOUGH TO SPOOL UP LINES 6.45245 DECOMP RIG UP CONTROL LINE PULLERS ON TUGGER LINES AND HOLD PRE -JOB SAFETY MEETING WITH RIG TEAM FOR PULLING CONTROL LINES INDIVIDUALLY FROM TUBING -HOLD STOP THE JOB DRILL WITH YEAROUT CREW (5X5) AFTER PULLING FIRST JOINT WITH NEW RIGUP TO REVIEW JOB PLANNING 6452.45 DECOMP LAY DOWN 4-1/2", 12.6#, NSCT TUBING JOINT 8 AT 6077' MD TO SURFACE - PULLING SPEED DURING CONTROL LINES= 150 FPM, STRAIGHT PIPE = 265 FPM - ALL OLD COMPLETION EQUIPMENT TESTED FOR NORM PRIOR TO LEAVING LOCATION (TUBING - POSITIVE, CONTROL LINE - POSITIVE) SUMMARY OF EQUIPMENT RECOVERED: - (162) FULL JOINTS - (1) TUBING HAGER WITH 2' XO PUP AND 2' SPACEOUT PUP - DUAL CONTROL LINES TO HES SVLN AT 2184' IN ORIGINAL COMPLETION - (50) TOTAL STAINLESS STEEL BANDS (4) POTENTIALLY LEFT DOWNHOLE IF ORIGINALLY INSTALLED WITH 1 PER JOINT (ORIGINAL RECORDS ARE UNCLEAR) - (1) GLM ASSY WITH 10' HANDLING PUPS, (1) SVLN ASSY WITH 10' HANDLING PUPS - (1) CUT JOINT, 9.95, FLARE OD = 4-15/16", CUT CONDITION = GOOD 645245 DECOMP RIG DOWN CASING EQUIPMENT - CLEAN AND CLEAR RIG FLOOR - REMOVE BANDS FROM FLOW BOX - INSTALL WEAR BUSHING (ID = 9-1/8") 645245 DECOMP MAKEUPAND RUN IN THE HOLE WITH HES 9-5/8", 47# EZSV PER HES REP ON 5" WIRED DRILL PIPE TO 1904' MD AT MIDNIGHT - RUNNING SPEED = 90 FPM PER HES - SINGLE IN ON 5" DP 6,472.45 DECOMP RUN IN THE HOLE WITH HES 9-5/8", 47# EZSV PER HES REP ON 5" WIRED DRILL PIPE FROM 1904' MD TO TAG TUBING STUB AT 6472' DRILLPIPE MD (2' HIGHER THAN EXPECTED FROM PRE -RIG MTT LOG). PICKUP 1' TO SET EZSV V ABOVE TUBING STUB. - RUNNING SPEED = 90 FPM PER HES Printed 6(7/2018 443'.50PM 'All depths reported in Drillers Depths" North America - ALASKA- BP Operation Summary Report Page 6 of 31 Common Well Name: 11-23 - PICK UP AND SHEAR OFF WITH 50 KLBS AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 End Date: 5/16/2018 X3 -018Y4 -C: (6,086,993.00 ) Project: PBU Site: 11 FOR SETTING WHIPSTOCK AND NOT MILLING Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 12:00:OOAM COLLAR) Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. CIRCULATE BOTTOMS UP ON TOP OF THE BPUOI: USA00001229 Active datum: 11-238 Actual @74.60usft (above Mean Sea Level) Date From- To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ (usR) 02:30 - 03:00 0.50 CASING P 6468,45 DECOMP SET EZSV WITH 35 TURNS TO THE RIGHT Printed 6/7/2016 4:43:50PM *All depths reported in Drillers Depths' - PICK UP AND SHEAR OFF WITH 50 KLBS OVERPULL - IOP OF EZSV SET AT 6468' MD (OPTIMAL FOR SETTING WHIPSTOCK AND NOT MILLING COLLAR) 03'.00 - 03:30 0.50 CASING P 6,46845 DECOMP CIRCULATE BOTTOMS UP ON TOP OF THE EZSV - 15 BPM, 950 PSI, NO PIPE MOVEMENT - MUD WEIGHT IN/OUT = 9.8 PPG BRINE 03:30 - 04:30 1.00 CASING P 6,46845 DECOMP PRESSURE TEST CASING 7O 3500 PSI HIGH 'FOR 30 MIN (PASS) ,- REVIEW PRESSURE CROSSCHECK CHECKLIST - TEST APPROVED BY WSUP, SEE ATTACHED •DOCUMENTS 04.30 - 0700 2.50 CASING P 6,468.45 DECOMP PULL OUT OF THE HOLE FROM THE TOP OF THE EZSV AT 6469' MD TO SURFACE. LAYDOWN EZSV RUNNING TOOL - LAY DOWN EZSV RUNNING TOOL -FLOWCHECK WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM (STATIC) _ 0700 - 0900 2.00 STWHIP P 6,46845 WEXIT MAKEUP 9-5/8"SLB ONE -TRIP TRACKMASTERWHIPSTOCK AND MILLS. SCRIBE MILLS IN HOLE TO MWD. - CONFIRM 55 KLBS SHEAR PIN - FLOWCHECK WELL FOR 10 MIN PRIOR TO RUNNING IN HOLE (STATIC) WHILE PICKING UP THROUGH THE WELLHEAD AND STACK TO CHECK THE - MWD -TRAY SCRIBE, THE WHIPSTOCK CAUGHT ON SOMETHING, LEADING TO AN INADVERTENT SHEAR OF THE 55 KLBS SHEAR BOLT BETWEEN THE TRAYAND THE MILLS. THE WHIPSTOCK FELL DOWNHOLE AND IS SUSPECTED TO BE SITTING ON THE EZSVAT 6468' MD. - ONLY 5 KLBS OVERPULL WAS OBSERVED ON TOTCO AT 9:03AM TIME OF EVENT. - AT TIME OF OVERPULL, TOP OF WHIPSTOCK CORRESPONDS TO LOWER PIPE RAMS WITH BOTTOM OF WHIPSTOCK AT WELLHEAD. Printed 6/7/2016 4:43:50PM *All depths reported in Drillers Depths' Common Well Name: 11-23 Event Type: RE-ENTER- ONSHORE (RON) North America -ALASKA - BP Operation Summary Report Start Date: 4/24/2018 End Date: 5/16/2018 AFE No K3 -018Y4 -C.(6,086,993.00) Page 7 of 31 Project: PBU Site: 11 -- — - 1.50 FISH Rig Name/No.: PARKER 272 Spud Date/time: 7/11/1986 12:00.00AM Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. FISH N SPUOI: USA00001229 Alive datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 09:00 - 13:30 4.50 FISH N 6,468.45 WEXIT PREPARE TO FISH WHIPSTOCK 13.30 - 15'.00 1.50 FISH N 15.00 - 18:30 3.50 FISH N 18:30 - 1930 1.00 FISH N 1930 - 00.00 4.50 FISH N 4/30/2018 0000 - 01:30 1.50 FISH N - PICKUP (7) STANDS 5" HWDP WITH OFFLINE EQUIPMENT - CALLOUT FISHING JARS - DEVELOP FISHING PLAN WITH SLB REP AND OCN #2 FOR WELL WITH ODE -DRAIN STACK TO CONFIRM NO OBSTRUCTIONS DOWN TO WELLHEAD - VISUALLY INSPECT LOWER RAM CAVITY WITH BORESCOPE (VISUALLY OK) - PULL WEAR RING AND CONFIRM NO DAMAGE - RE -PRESSURE TEST 9-5/8" CASING , AGAINST BLIND RAMS TO 3500 PSI FOR 30 WAS NOT COMPROMISED BY DROPPED WHIPSTOCK (REVIEW PRESSURE CROSSCHECK, PASS, SEE ATTACHED CHART)_ 6,468.45 WEXIT MAKEUP SLB FISHING ASSEMBLY FROM SURFACE TO 143'OVERALL LENGTH - PRIMARY FISHING TOOL =DIE COLLAR (SIMILAR TO OVERSHOT) 646845 WEXIT TRIP IN THE HOLE WITH SLB WHIPSTOCK FISHING ASSEMBLY FROM BHA AT 143' MD TO TAG WHIPSTOCK FISH AT 6426' MD (-19' ! FROM THE TOP OF THE EZSV) ! - 100 FPM RUNNING SPEED IN CASE WHIPSTOCK DIDN'T FALLTO BOTTOM - NO WEAR RING INSTALLED TO ENSURE IT IS NOT A POTENTIAL HANG UP SPOT ON THE WAY OUT OF THE HOLE - PU 182 KLBS, SO 138 KLBS, ROT 161 KLBS,10 RPM, 7K TORQUE fi 468.45 WEXIT ENGAGE WHIPSTOCK WITH DIE COLLAR -PUSH WHIPSTOCK TO BOTTOM AT 6445'MD (BOTTOM OF WHIPSTOCK AT 6468' MD) AND SET DOWN 10K TO TRIP ANCHOR, OBSERVE GOOD INDICATION OF WHIPSTOCKANCHOR TRIPPING - PICK UP AND INITIATE ROTATION AT 10 RPM, 7 KFT-LBS -SET DOWN 10KAND ROTATEAT 10 RPM, 7-15 KFT-LBS TORQUE TO ENGAGE THE WHIPSTOCK WITH THE DIE COLLAR - MONITOR WELL FOR 10 MIN (STATIC) fi 468.45 WEXIT PULL OUT OF THE HOLE WITH 9-5/8" WHIPSTOCK FISH ASSEMBLY FROM EZSV AT 6468' MD TO THE TOP OF THE FISHING BHA AT 143' MD - PULL AT 45 FPM - MONITOR WELL FOR 10 MIN AT THE TOP OF THE BHA (STATIC) 6,46845 WEXIT LAY DOWN WHIPSTOCK FISHING BHA FROM W, TMD TO SURFACE OBSERVE 15K OVERPULL PULLING THE BOTTOM OF THE WHIPSTOCK THROUGH THE WELLHEAD - LAY DOWN WHIPSTOCKAND DIE COLLAR TOGETHER - RECOVER 100% OF WHIPSTOCKASSEMBLY Printed 61712018 44:50PM 'All depths reported in Drillers Depths' Printed 6/7/2018 4.43.50PV `All depths reported in Drillers Depths' North America - ALASKA - BP Page 8 of 31 Operation Summary Report Common Well Name: 11-23 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 End Date: 5/16/2018 X3 -018Y4 -O. (6,086,993.00 ) Project: PBU Site. 11 Rig Name/No.: PARKER 272 Spud Daterrime: 7/11/1986 12:00 OOAM Rig Release: 5/20/2018 Rig Contractor PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ _ (hr) (usft) 01:30 - 02:30 I 1.00 FISH N 6,468.45 WEXIT INSTALL WEAR BUSHING (9-1/8" ID) 02:30 - 04:00 1.50 STWHIP N 6,468.45 WEXIT MAKE UP9-5/8"X8-1/2"WHIPSTOCKAND MILLASSEMBLY TO TOTAL LENGTH OF 111' MD - MAKE UP BAKER MWD TO SLB FLEX COLLAR, FLOAT SUB, AND TRIMILLS -CHECK DERRICK LEVEL WITH MILL ASSEMBLY HANGING IN ELEVATORS (83' TOTAL LENGTH), PIPE HANGS TO THE REAR OF THE ROTARY TABLE - SCRIBE MWD TO WHIPSTOCK SLIDE - DRIFT WELLHEAD WITH MILL ASSEMBLY '(NO ISSUES) -MAKE UP WHIPSTOCKAND RUN IN THE HOLE _ TRUN 04:00 - 11:00 7.00 _ STWHIP P 6,468.45 WEXIT IN THE HOLE WITH 9-5/8" X 8-1/2" WHIPSTOCKAMD MILLASSEMBLY FROM 111' MD TO TOP OF EZSV AT 6468' MD I- RUN IN THE HOLE AT 45 FPM I- SHALLOW HOLE TEST MWD AT 850'MD WITH 550 GPM, 1100 PSI (GOOD TEST) . - ORIENT WHIPSTOCK TO 170" LOHS PRIOR !TO TAGGING EZSV - TAG EZSV ON DEPTH, PICKUP 2'AND SET WHIPSTOCK WITH TOP AT 6443' MID, BOTTOM OF WINDOW PLANNED AT 6457' MD (14' WINDOW) SHEAR OFF PER SLB REP WITH 55 KLBS DOWN (AS EXPECTED FOR PIN) - PU 187K, SO 144K 11:00 - 12:00 1.00 STWHIP P 8,443.45 WEXIT DISPLACE WELL TO 9.8 PPG LSND MILLING FLUID 750 GPM, 2250 PSI 12:00 - 21:30 9.50 STWHIP P 6,457.45 WEXIT MILL 8-1/2" WINDOW IN THE 9.518" CASING FROM 6443' MD TO 6457' MD - 2 FPM ROP PER MILLING PROCEDURE FOR � LOW SIDE EXIT (t - 400 GPM, 950 PSI, 80-100 RPM, 22/16 KFT-LB W TORQUE ON/OFF BOTTOM, 2-5 KLBS WOB 21:30 - 0000 2.50 STWHIP P 6,45745 WEXIT DRILL NEW FORMATION FROM 6457' MD TO 6469' MD - 5 FPH ROP - 400 GPM, 950 PSI, 110 RPM, 16 KFT-LB TORQUE ON BOTTOM, 5-10 KLBS WOB - MUD WEIGHT IN/OUT = 9.8 PPG - NO CEMENT OBSERVED ON THE BACKSIDE OF THE CASING 5/1/2018 00:00 - 02:00 2.00 STWHIP P 6,477.45 WEXIT DRILL 20'OF NEW FORMATION FROM 6469' MD TO 6477' MD - 5-7 FPH ROP -400 GPM, 950 PSI, 110 RPM, 16 KFT-LB TORQUE ON BOTTOM, 5-10 KLBS WOB - MUD WEIGHT IN/OUT = 9.8 PPG - REAM WINDOWAND DRIFT WITH NO PUMPS (NO ISSUES) TOP OF WINDOW = 6443' MD, BOTTOM = 6457' MD Printed 6/7/2018 4.43.50PV `All depths reported in Drillers Depths' North America - ALASKA - Bla Operation Summary Report Common Well Name. 11-23 Event Type: RE-ENTER- ONSHORE(RON) Start Date: 4/24/2018 Project: Pau Site: 11 Rig Name/No.: PARKER 272 Spud Date/Time: 7/11 Rig Contractor: PARKER DRILLING CO. 2.00 Active datum. 11-23B Actual @74.60usft (above Mean Sea LeveQ Date From - To Him Task Code (hr) 02:00 - 02:30 0.50 STWHIP P 02:30 - 03:30 I 1.00 STWHIP P 03:30 - 06:30 3.00 STWHIP P 0630 - 08.30 2.00 STWHIP P 08:30 - 09:30 09:30 - 1200 1.00 STWHIP 2.50 DRILL End Date: 5/16/2018 Page 9 of 31 AFE No X3-01 BY4-C. (6,086,993.00 ) Rig Release: 5/202018 BPUOI: USA00001229 NPT Total Depth Phase Description of Operations . (usft) 6,477.45 WEXIT PULL MILLS INTO WINDOWAT 6443'MD AND CIRCULATE HOLE CLEAN - PUMP 35BBL HIGH VIS SWEEP SURFACE TO SURFACE - 750 GPM, 2350 PSI - VERIFY CONSISTENT MUD WEIGHT IN/OUT =9.8 PPG - MONITOR WELL FOR 10 MIN (STATIC) 6,477.45 WEXIT RIG UPAND PERFORM FIT TO 12.6 PPG EMW -MUD WEIGHT. 9.8 PPG, 4896' TVD, 6443' MD, PRESSURE - PUMP 1.1 BBLS TO 730 PSI, BLEED BACK 1 BELS - PRESSURE BLEEDS DOWN TO 480 PSI IN TEN MINUTE MONITORING PERIOD - FIT FOR KICK TOLERANCE> 25 BBLS APPROVED BY ODE 6,477.45 WEXIT PULL OUT OF THE HOLE FROM 6443' MD TO THE TOP OF BHAAT 852' MD - MONITOR WELL ON BOTTOM FOR 10 MIN (STATIC) - MUD WEIGHT IN/OUT = 9.8 PPG - PULL OUT OF THE HOLE AT 250 FPM 6,47745 WEXIT RACK BACK / LAY DOWN MILLING BHA FROM 852' MD TO SURFACE - MONITOR WELL FOR 10 MIN PRIOR TO PULLING BHA INTO BOP STACK (STATIC) - RACK BACK HWDP AND LAY DOWN MWD AND MILLING ASSEMBLY - LEAD MILL 1/4" UNDER, FOLLOW MILL 3/16' UNDER, DRESS MILL FULL GAGE P 6,477.45 WEXIT CLEAN AND CLEAR RIG FLOOR -FLUSH STACK P 6,477.45 INTI MAKE UP 8-1/2" INTERMEDIATE MOTOR BHA TO TOTAL LENGTH OF 184' MD - PICK UP 8-1/2" HCC VM -1 MILLTOOTH TRICONE BIT, MOTOR WITH 1.3-AKO, MWD! LWD - EMS TOOL 115' BACK FROM THE BIT 12:00 - 15:30 3.50 DRILL P 6,47245 INTI RUN IN THE HOLE WITH THE 8-1/2" INTERMEDIATE MOTOR BHA ON 5" WIRED DRILL PIPE FROM 184' MD TO BOTTOM AT 6477' MD - RUN IN THE HOLE ON ELEVATORS - 1 ASM 1193' BACK FROM THE BIT, DATA LINKS EVERY 15 STANDS Printed 6!72018 4:43:50PM *AB depths reported in Drillers Depths* Printed 6!7/2018 4:43:50PM `All depths reported in Drillers Depths' North America - ALASKA - BP Page 10 of 31 Operation Summary Report Common Well Name. 11-23 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 End Date', 5/16/2018 X3 -018Y4 -O. (6,086 993 00 ) Project: PBU Site: it Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 12:00:OOAM Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. BPUO1: USA00001229 Active datum: 11-23BActual @74.60usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 15:30 - 00:00 8.50 DRILL P 6,781.45 INTI DIRECTIONALLY DRILL 8-1/2" INTERMEDIATE HOLE FROM 6477' MD TO 6791' MD, TO GAIN SEPERATION FROM PARENT WELLBORE AND ESTABLISH 5 CLEAN MWD SURVEYS • - 314' IN 10 HOURS = 37 FPH WITH CONNECTIONS - 500 GPM, 1570/1500 PSI ON/OFF BOTTOM - 60 RPM, 16/15 KFT-LBS TRO ON/OFF BOTTOM, UP TO 15 KLBS WOB - PU = 218 KLBS, SO = 132 KLBS, ROT = 167 KLBS - SURVEY EVERY 30' -ECD ACTUAL =10.88 PPG - ZERO LOSSES WHILE DRILLING AHEAD - MUD WEIGHT IN/OUT = 9.8 PPG - GAS WATCH: AVG BACKGROUND 25 UNITS, MAX 25 UNITS _ 5/2/2018 00:00 - 00:30 0.50 DRILL P 6,808.45 INTI DIRECTIONALLY DRILL 8-1/2" INTERMEDIATE HOLE FROM 6791' MD TO 6808' MD, TO GAIN SEPERATION FROM PARENT WELLBORE AND ESTABLISH 5 CLEAN MWD SURVEYS ' - ACHIEVED SEPARATION AND 5 CLEAN SURVEYS BY 6808' MD - 500 GPM, 1570/1500 PSI ON/OFF BOTTOM - 60 RPM, 16/15 KFT-LBS TRO ON/OFF BOTTOM, UP TO 15 KLBS WOB - PU = 218 KLBS, SO = 132 KLBS, ROT = 167 KLBS - SURVEY EVERY 30' -ECD ACTUAL =10.88 PPG -ZERO LOSSES WHILE DRILLING AHEAD - MUD WEIGHT IN/OUT = 9.6 PPG - GAS WATCH: AVG BACKGROUND 25 UNITS, MAX 25 UNITS 0030 - 01:30 1.00 DRILL P 6,808.45 INTI BACKREAM FROM 6808' MD TO 6515' MD TO GET THE UPPER STABILIZER TO THE BOTTOM OF THE WINDOW - MONITOR THE WELL FOR 10 MIN (STATIC) -600 GPM, 1950 PSI, 60 RPM, 17K TORQUE, 1000 FPH - MUD WEIGHT IN/OUT = 9.8 PPG 01:30 - 03:00 1.50 DRILL P 6,808.45 INTI MADD PASS FROM 6520' MD TO 6385MD BIT DEPTH FOR TIE IN LOG ABOVE WINDOW _ - 500 GPM, 1500 PSI, 250 FPH 03:00 - 05:30 2.50 DRILL P 6,808.45 INTI PULL OUT OF THE HOLE ON ELEVATORS FROM 6385' MD TO THE TOP OF THE BHA AT 1204' MD - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM (STATIC) 105:30 - MUD WEIGHT IN/OUT = 9.8 PPG - 08:30 3.00 DRILL P 6,808.45 INT1 RACK BACK/ LAY DOWN BHA FROM 1204'MD TO SURFACE - MONITOR WELL PRIOR TO PULLING BHA I NTO BOP STACK (STATIC) - LAY DOWN ALL DIRECTIONAL TOOLS AND 4 STANDS OF 5" HWDP _ -BIT GRADE: 2 -2 -IN GAGE 08:30 - 09:30 1.00 DRILL P 6,808.45 _ INT1 _ CLEAN AND CLEAR RIG FLOOR Printed 6!7/2018 4:43:50PM `All depths reported in Drillers Depths' North America - ALASKA - BP Page 11 of 31 Operation Summary Report Common Well Name: 11-23 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 End Date: 5/1612018 X3-018Y4-C: (6,086,993.00 ) Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 12:00:OOAM Rig Release: 5/2012018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To His Task Code NPT Total Depth Phase Descnpbon of Operations (hr) (us8) 09:30 - 14:00 4.50 DRILL P 6,808.45 INTI MAKE UP &1/2" X 9-7/8" ANDERREAMER / AUTOTRAK BHA TO A TOTAL LENGTH OF 889' MD - 8-1/2" SK616 PDC BIT, 9-7/8" ANDERREAMER, MWD/LWD WITH PWD/DIR/GR/RES - EMS 90' BACK FROM BIT '- SHALLOW HOLE TEST AT 889'MD, 500 GPM, 980 PSI (GOOD TEST) -OBSERVE INTERMITTENCY IN WIRED PIPE 'SYSTEM AROUND THE AREA OF THE ANDERREAMER, DECISION MADE TO _ CONTINUE RUNNING IN THE HOLE 1400 - 1630 2.50 DRILL P 6,808.45 INTI RUN IN THE HOLE WITH THE 8-1/2" X 9-7/8" ANDERREAMER / AUTOTRAK BHA ON 5" WIRED DRILLPIPE FROM 889' MD TO 5646' MD ASM #1 2027 BACK FROM BIT, ASM #2 4026' BACK FROM BIT 16:30 - 17:30 1.00 DRILL P 6,808.45 INTI CUT AND SLIP 56' OF DRILL LINE, 7 WRAPS - MONITOR THE WELL ON THE TRIP TANKS (STATIC) '- RECALIBRATE BLOCK HEIGHT IN AMPHION AND-BAKER SYSTEMS 1730 - 19.30 2.00 DRILL P 6,808.45 INTI RUN IN THE HOLE WITH THE 8-1/Z'X 9-7/8" ANDERREAMER / AUTOTRAK BHA ON 5" WIRED DRILLPIPE FROM 5648' MD TO BOTTOM AT 6808' MD - OBTAIN 3 SURVEYS CLEAN, MATCHING li SURVEYS FOR TOOL VERIFICATION AT SURVEY DEPTHS FROM PREVIOUS BHA, NO COMMUNICATION WITH MWD THROUGH WIRED PIPE (MISCOMMUNICATION IS LOCATED -200' BACK FROM THE BIT), USE MUOPULSE TELEMETRY FOR SURVEYS AND DOWNLINKS - DROP BALL TO OPEN ANDERREAMER AT 6782' MD BIT DEPTH (ANDERREAMER DEPTH OF 6631' MD) 1930 - 0000 4.50 DRILL P 7,069.45 INT1 DIRECTIONALLY DRILL B-1/2"x9-7/8" INTERMEDIATE HOLE SECTION FROM 6808' MD TO 7069', (261 FT IN 4.5 HRS = 58 FT/HR WITH CONNECTIONS) - INSTANTANEOUS ROP 100-200 FPH - 750 GPM, 2690 PSI ON/OFF BOTTOM - 120 RPM, 18 KFT-LBS TORQUE ON BOTTOM, 17 KFT-LBS TORQUE OFF BOTTOM, 12 KLBS WOB - PU = 243 KLBS, SO = 125 KLBS, ROT = 158 KLBS - SURVEY EVERY STAND - ECD ACTUAL = 11.18 PPG EM W -ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 9.8 PPG - GAS WATCH: AVG BACKGROUND 25 UNITS, MAX 122 UNITS Printed 6!7/2018 4:43:50PM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Mame. 11-23 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 Eno Date: 5/16/2018 Project: PBU Site: 11 AFE No X3 -016Y4 -C: (6,006 993 00 ) Page 12 of 31 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74.60usR (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Desaiption of Operations (hr) (usR) 5/3/2018 00:00 - 06:00 6.00 DRILL P 7,50045 INTI DIRECTIONALLY DRILL S -1/2"x9-7/8" INTERMEDIATE HOLE SECTION FROM 7069' MD TO 7500' MD, (431 FT IN 6 HRS = 72 FT/HR WITH CONNECTIONS) - INSTANTANEOUS ROP 100-200 FPH - 750 GPM, 2800 PSI ON/OFF BOTTOM -150 RPM, 21 KFT-LBS TORQUE ON BOTTOM, 18 KFT-LBS TORQUE OFF BOTTOM, 15 KLBS WOB - PU = 243 KLBS, SO = 125 KLBS, ROT = 158 KLBS - SURVEY EVERY STAND -ECD ACTUAL= 11.23 PPG EMW -ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 9.8 PPG -GAS WATCH: AVG BACKGROUND 25 UNITS, MAX 257 UNITS - PUMP 35 BBL HIGH VIS SWEEP AT 7350' MD, 100% INCREASE IN CUTTINGS BACKAT SHAKERS - HOLD UNANNOUNCED D2 KICK WHILE DRILLING DRILL 0600 - 1200 6.00 DRILL P 7861.45 INTI DIRECTIONALLY DRILL8-1/2"x9-7/8" INTERMEDIATE HOLE SECTION FROM 7500' MD TO 7861' MD, (361 FT IN 6 HRS = 60 FT/HR WITH CONNECTIONS) - INSTANTANEOUS ROP 150-300 FPH -700 GPM, 2660 PSI ON/OFF BOTTOM -150 RPM, 24 KFT-LBS TORQUE ON BOTTOM, 20 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS WOB - PU = 250 KLBS, SO = 149KLBS, ROT = 175 KLBS -SURVEY EVERY STAND - ECD ACTUAL = 11.1 PPG EMW -ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 9.8 PPG - GAS WATCH: AVG BACKGROUND 25 UNITS, MAX 210 UNITS Printed 6/7/2018 4:43:50PM `All depths reported in Drillers Depths` North America - ALASKA - BP Page 13 of 31 Operation Summary Report Common Well Name: 11-23 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 End Date: 5/16/2018 Project: PBU Site: 11 Rig Namai PARKER 272 Spud DateRme: 7/11/1986 12:00 OOAM Rig Contractor: PARKER DRILLING CO. Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase (hr) (usft) 12:00 - 18:00 6.00 DRILL P 8,495.45 INTI 18.00 - 00'.00 6.00 DRILL P 9,040.45 INT1 Printed 6/7/2018 4.43'.50PM 'All depths reported in Drillers Depths' AFE No K3 -018Y4 -C'. (6,086,993,00) BPUOI: USA00001229 Description of Operations DIRECTIONALLY DRILL 8-1/2" x 9-7/8" INTERMEDIATE HOLE SECTION FROM 7861' MD TO 8495' MD, (634 FT IN 6 HRS = 105 FT/HR WITH CONNECTIONS) INSTANTANEOUS ROP 100-300 FPH -700 GPM, 2700 PSI ON/OFF BOTTOM -150 RPM, 28 KFT-LBS TORQUE ON BOTTOM, 24 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS WOB - PU = 287 KLBS, SO = 155KLBS, ROT = 191 KLBS SURVEY EVERY STAND ECD ACTUAL= 11.28 PPG EMW -ZERO LOSSES WHILE DRILLING AHEAD NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED -MUD WEIGHT IN/OUT= 10 PPG, BEGIN BLENDING 290 BBL OF 11.3 PPG SPIKE FLUID AT 8350' MD TO WEIGHT UP THE SYSTEM TO 10 PPG BY PRIOR TO DRILLING THE CM3 -8798' MD - GAS WATCH: AVG BACKGROUND 25 UNITS, MAX 115 UNITS _ DIRECTIONALLY DRILL 8-1/Z'x 9-7/8" INTERMEDIATE HOLE SECTION FROM 8495' MD TO 9040' MD, (545 FT IN 6 HRS = 91 FT/HR WITH CONNECTIONS) - INSTANTANEOUS ROP 100-300 FPH, LIMIT ROP AS NECESSARY FOR ECD MANAGEMENT .700 GPM, 3000 PSI ON/OFF BOTTOM - 150 RPM, 28 KFT-LBS TORQUE ON BOTTOM, 24 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS WOB - PU = 320 KLBS, SO = 155KLBS, ROT = 195 KLBS - SURVEY EVERY STAND -ECDACTUAL=11.4 PPG EMW - ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEEO ENABLED - MUD WEIGHT IN/OUT = 10 PPG, COMPLETE WEIGHT UP TO 10 PPG AT -8500' MD - GAS WATCH: AVG BACKGROUND 25 UNITS, MAX 25 UNITS - HOLD UNANNOUNCED D2 KICK WHILE DRILLING DRILL Common Well Name: 11-23 Event Type: RE-ENTER- ONSHORE(RON) Project: PBU North America - ALASKA - BP Page 14 of 31 Operation Summary Report Stan Date: 4/24/2018 Site: 11 End Date: 5116/2018 AFE No X3 -018Y4 -C:(6,086,993.00) I Rig Narne/IVo.: PARKER 272 Spud DateTme: 7/11/1986 12:00 OOAM Rig Release: 5/20/2018 Rig Contractor. PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _ (hr). _ _ _ (usft) 5/4/2018 00:00 - 06:00 6.00 DRILL P 9,422.45 INT1 DIRECTIONALLY DRILL B -1/2"x9-7/8" INTERMEDIATE HOLE SECTION FROM 9040' MD TO 9422' MD, (382 FT IN 6 HRS = 64 FT/HR WITH CONNECTIONS) -INSTANTANEOUS ROP 50-100 FPH, LIMIT ROP AS NECESSARY FOR ECD MANAGEMENT - 700 GPM, 3050 PSI ON/OFF BOTTOM - 120 RPM, 27 KFT-LBS TORQUE ON BOTTOM, 23 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS WOB - PU = 300 KLBS, SO = 165KLBS, ROT = 199 KLBS - SURVEY EVERY STAND -ECDACTUAL= 11.45 PPG EMW, MAXIMUM ECD LIMIT 11.5 PPG EMW PER WELL PROGRAM - ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED '- MUD WEIGHT IN/OUT = 10 PPG GAS WATCH: AVG BACKGROUND 25 UNITS, MAX 66 UNITS 06:00 - 12:00 6.00 DRILL P 9,729.45 INTI DIRECTIONALLY DRILL B -1/2"x9-7/8" INTERMEDIATE HOLE SECTION FROM 9422' MD TO 9729' MD, (307 FT IN 6 HRS = 51 FT/HR WITH CONNECTIONS) - INSTANTANEOUS ROP 50 - 100 FPH, LIMIT ROP AS NECESSARY FOR ECD MANAGEMENT - 700 GPM, 3250 PSI ON/OFF BOTTOM - 130 RPM, 27 KFT-LBS TORQUE ON BOTTOM, 25 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS WOB - PU = 325 KLBS, SO = 173KLBS, ROT = 207 KLBS - SURVEY EVERY STAND -ECO ACTUAL = 11.5 PPG EMW, MAXIMUM ECD LIMIT 11.5 PPG EMW PER WELL PROGRAM -ZERO LOSSES WHILE DRILLING AHEAD NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 10.1 PPG - GAS WATCH: AVG BACKGROUND 25 UNITS, MAX 69 UNITS - PUMP 35 BBL HIGH VIS SWEEP AT 9445' MD, 50% INCREASE IN CUTTINGS BACKAT SHAKERS Printed 6/7/2018 4:43:50PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 15 of 31 Common Well Name. 11-23 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 Eno Date. 5/16/2018 X3 -018Y4 -C: (6,086,993.00 ) Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud Date/Fime: 7/11/1986 12:00:00AM Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-238 Actual @74.60usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) _ _ _(usft) _ 12:00 - 18:00 6.00 DRILL P 10,069.45 INTI DIRECTIONALLY DRILL 8-1/2"x9-7/8" INTERMEDIATE HOLE SECTION FROM 9729' MD TO 10069' MD, (340 FT IN 6 HRS = 56 FT/HR WITH CONNECTIONS) ',- INSTANTANEOUS ROP 50 - 100 FPH, LIMIT ROP AS NECESSARY FOR ECD I MANAGEMENT - 700 GPM, 3330 PSI ON/OFF BOTTOM - 130 RPM, 25 KFT-LBS TORQUE ON BOTTOM, 23 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS WOB - PU = 305 KLBS, SO = 190KLBS, ROT = 219 KLBS - SURVEY EVERY STAND -ECD ACTUAL= 11.5 PPG EMW, MAXIMUM ECD LIMIT 11.5 PPG EMW PER WELL PROGRAM - ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED MUD WEIGHT IN/OUT= 10.3 PPG, PERFORM WEIGHT UP/DILUTION WITH BLACK PRODUCT EARLY IN AN ATTEMPT TO HELP . ECD WITH NO SUCCESS, ECD SUSTAINED 11.5 PPG EMW AFTER WEIGHT UP/DILUTION - GAS WATCH: AVG BACKGROUND 40 UNITS, MAX 202 UNITS - PUMP 35 BBL HIGH VIS SWEEPAT 9921' MD, 75% INCREASE IN CUTTINGS BACKAT SHAKERS 1800 - 0000 6.00 DRILL P 10,337.45 INTI DIRECTIONALLY DRILL8-1/2"x9-7/8" INTERMEDIATE HOLE SECTION FROM 10069' MD TO 10337' MD, (268 FT IN 6 HRS = 45 FT/HR WITH CONNECTIONS) -INSTANTANEOUS ROP 50 - 80 FPH, LIMIT ROP AS NECESSARY FOR ECD MANAGEMENT -700 GPM, 3300 PSI ON/OFF BOTTOM -130 RPM, 29 KFT-LBS TORQUE ON BOTTOM, 27 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS WOB - PU = 323 KLBS, SO = 182KLBS, ROT = 221 KLBS - SURVEY EVERY STAND -ECD ACTUAL= 11.5 PPG EMW, MAXIMUM ECD LIMIT 11.5 PPG EMW PER WELL PROGRAM -ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 10.3 PPG - GAS WATCH: AVG BACKGROUND 40 UNITS, MAX 193 UNITS - PUMP 35 BBL HIGH VIS SWEEPAT 10209' MD, 25% INCREASE IN CUTTINGS BACKAT SHAKERS -PERFORM WEEKLY BOPE FUNCTION TEST Printed 6/7/2018 4:43:50PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: 11-23 Event Type: RE -ENTER -ONSHORE (RON) Start Date 4/24/2018 End Date. 5116/2018 Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 1Z00:00AM Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth (hr) (usft) 5/5/2018 00:60---06:00 6.00 DRILL P 10,615.45 Page 16 of 31 AFE No K3 -018Y4 -C: (6.086 993 00 ) BPUOI: USA00001229 Phase Description of Operations --._. __ INTI DIRECTIONALLY DRILL-8 INTERMEDIATE HOLE SECTION FROM 10337' MD TO 10615' MD, (280 FT IN 6 HRS = 44 FT/HR WITHWITH C�T�NIS) - INSTANTANEOUS ROP 50-80 FPH, LIMIT ROP AS NECESSARY FOR ECD MANAGEMENT 700 GPM, 3300 PSI ON/OFF BOTTOM - 130 RPM, 30 KFT-LBS TORQUE ON BOTTOM, 28 KFT-LBS TORQUE OFF BOTTOM, 22 KLBS WOB - PU = 323 KLBS, SO = 192KLBS, ROT = 226 KLBS - SURVEY EVERY STAND ECDACTUAL= 11.5 PPG EMW, MAXIMUM ECD LIMIT 11.5 PPG EMW PER WELL PROGRAM -ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 10.3 PPG - GAS WATCH: AVG BACKGROUND 140 UNITS, _ MAX 610 UNITS 06:00 - 08:00 2.00 DRILL P 10,815.451 INTI CIRCULATE UP SAMPLES WITH I.5X BOTTOMS UP 08:00 - 10:00 2.00 DRILL P 10:00 - 15:30 5.50 1530 - 18:30 3.00 DRILL P DRILL P 1830 - 19:00 0.50 DRILL P 1900 - 2030 1.50 CASING P Printed 6/7/2018 4:43:SOPM 'All depths reported in Drillers Depths` - 700 GPM, 3275 PSI, 60 RPM, 25-27 KFT-LBS TORQUE, RECIPROCATE PIPE 40' - OBSERVED SHUBLIK IN SAMPLES, ESTIMATE ONLY -1' INTO SHUBLIK, DECISION MADE TO DRILLAN ADDITIONAL 2'MD 10,617.45 INTI DRILL AN ADDITIONAL 2'MD TO HOLE SECTION TDAT 10617' MD, 8315' TVD AND CIRCULATE HOLE CLEAN WITH 1.5 BOTTOMS UP - 700 GPM, 3250 PSI, 60 RPM, 18-20 KFT-LBS TORQUE, RECIPROCATE 70' - MONITOR WELL FOR 10 MIN (STATIC) 10,617.45 INTI PULL OUT OF THE HOLE FROM BOTTOM AT 10617' MD TO THE TOP OF THE BHAAT 889' MD - MUD WEIGHT IN/OUT = 10.3 PPG -OBTAIN SURGE/SWAB DATA WITH WIRED PIPE ASM'S IN THE COVILLE AT -9500' MD - PU 325 KLBS, SO 185 KLBS ON BOTTOM -MONITOR WELL PRIOR TO PULLING NON SHEARABLES INTO BOP STACK (STATIC) 10,617.45 INT1 LAY DOWN BHA FROM 889' MD TO SURFACE - BIT GRADE: 1 -1 -IN GAGE -ANDERREAMER IN GOOD CONDITION NO CHIPPED OR BROKEN CUTTERS - NO ELECTRICAL CONNECTIVITY THROUGH ANDERREAMER 10,617 45 INTI CLEAN AND CLEAR RIG FLOOR 10,617.45 INTI RIG UP DOYON CASING CREW TO RUN 7" LINER - DOUBLE STACK TONGS, SIDE DOOR ELEVATORS, PS -21 SLIPS WITH 7" SLIP BODIES Printed 6/7/2018 4:43:SOPM 'All depths reported in Drillers Depths` Common Well Name'. 11-23 Event Type: RE-ENTER- ONSHORE (RON) PBU North America - ALASKA - BP Page 17 of 31 Operation Summary Report Start Date. 4/24/2018 End Date: 5/16/2018 Site 11 Spud Date/time: 7/11/1986 12:00:OOAM Rig Contractor. PARKER DRILLING CO. Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To Hrs Task Code _ _ _____ (hr) 20:30 - 0000 3.50 CASING P 5/6/2018 00:00 - 04:00 4.00 CASING P 04:00 - 0690 2.00 CASING P AFE No (6,086,993.00 ) Rig Release: 5/20/2018 BPUOI'. USA00001229 NPT Total Depth Phase Description of Operations (usft) 10,617.45 INTI RUN 7", 26#, L-80, VAMTOP HC LINER TO 2025' P MD AT MIDNIGHT 09:30 - 12:30 3.00 - CHECK FLOATS (HOLDING) P - USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE CONNECTIONS TO 11950 FT -LBS - RUN 1 CENTRALIZER FREE FLOATING ON JOINTS 1 - 34 - FILL ON THE FLY AND TOP OFF EVERY IO JOINTS 10,617.45 INTI RUN 7',26#, L-80, VAMTOP HC LINER FROM 10,617.45 2025' MO TO LINER TOTAL LENGTH AT 4329' 'MD - USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE CONNECTIONS TO 11950 FT -LBS - FILL ON THE FLY AND TOP OFF EVERY 10 JOINTS MAKE UP LINER HANGER/PACKER ASSEMBLY ADD PAL MIX - CIRCULATE 1X LINER VOLUMES AT 10 BPM, 660 PSI - PU 120 KLBS, SO 102 KLBS WITH LINER _ FULL INT1 RUN IN HOLE WITH THE 7" LINER ON 5" DRILLPIPE TO THE 9-5/8" WINDOW AT 6443' MD - RIH AT 90 FT/MIN, ALL UPWARD MOVEMENT WITH PUMPS ON AT 2 BPM AND LESS THAN 50 FT/MIN - FILL ON THE FLY AND TOP OFF EVERY 10 STANDS - HOLD UNANNOUNCED D1 KICK WHILE TRIPPING DRILL INTI CIRCULATE 1.5X BOTTOMS UP - 8 BBUMIN, 620 PSI _ - PU 158 KLBS, SO 118 KLBS INTI RUN IN HOLE WITH THE 7" LINER ON 5" DRILLPIPE FROM THE 9-5/8" WINDOW AT 6443' MD TO LINER SET DEPTH AT 10615' MD (LINER TOP AT 6285' MD) - CIRCULATE DOWN 4 CORSECUTIVE STANDS ABOVE THE HRZ TO GETA BOTTOMS UP BY THE TOP OF THE HRZAT 10379' MD (5 BPM, 600 PSI, 1400 STROKES EACH) - WASH DOWN LAST 15AT 2 BPM, 380 PSI - TAG BOTTOM AT 10617' MD AND PICK UP 2' TO LINER SET DEPTH AT 10615' MD -NO ISSUES RUNNING THROUGH OPEN HOLE - FINAL PU 310 KLBS, SO 164 KLBS WITH PUMPS ON AT 2 BPM, PARKER 272 BLOCK WEIGHT 35 KLBS Printed 6712018 4:43:50PM 'All depths reported in Drillers Depths' 06:00 - 09:30 3.50 CASING P 10,617.45 09:30 - 12:30 3.00 CASING P 10,617.45 2025' MO TO LINER TOTAL LENGTH AT 4329' 'MD - USE JET LUBE SEAL GUARD PIPE DOPE - TORQUE CONNECTIONS TO 11950 FT -LBS - FILL ON THE FLY AND TOP OFF EVERY 10 JOINTS MAKE UP LINER HANGER/PACKER ASSEMBLY ADD PAL MIX - CIRCULATE 1X LINER VOLUMES AT 10 BPM, 660 PSI - PU 120 KLBS, SO 102 KLBS WITH LINER _ FULL INT1 RUN IN HOLE WITH THE 7" LINER ON 5" DRILLPIPE TO THE 9-5/8" WINDOW AT 6443' MD - RIH AT 90 FT/MIN, ALL UPWARD MOVEMENT WITH PUMPS ON AT 2 BPM AND LESS THAN 50 FT/MIN - FILL ON THE FLY AND TOP OFF EVERY 10 STANDS - HOLD UNANNOUNCED D1 KICK WHILE TRIPPING DRILL INTI CIRCULATE 1.5X BOTTOMS UP - 8 BBUMIN, 620 PSI _ - PU 158 KLBS, SO 118 KLBS INTI RUN IN HOLE WITH THE 7" LINER ON 5" DRILLPIPE FROM THE 9-5/8" WINDOW AT 6443' MD TO LINER SET DEPTH AT 10615' MD (LINER TOP AT 6285' MD) - CIRCULATE DOWN 4 CORSECUTIVE STANDS ABOVE THE HRZ TO GETA BOTTOMS UP BY THE TOP OF THE HRZAT 10379' MD (5 BPM, 600 PSI, 1400 STROKES EACH) - WASH DOWN LAST 15AT 2 BPM, 380 PSI - TAG BOTTOM AT 10617' MD AND PICK UP 2' TO LINER SET DEPTH AT 10615' MD -NO ISSUES RUNNING THROUGH OPEN HOLE - FINAL PU 310 KLBS, SO 164 KLBS WITH PUMPS ON AT 2 BPM, PARKER 272 BLOCK WEIGHT 35 KLBS Printed 6712018 4:43:50PM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 18 of 31 Common Well Name: 11-23 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 End Date: 5/16/2018 X3 -018V4 -C: (6.086.99100) Project PBU Site: 11 Rig Name/No.: PARKER 272 Spud Daterrime: 7/11/1986 12:00:00AM Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23BActual @74.60usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) _ (-it) 12:30 - 15:30 3.00 CASING P 10,61745 INTI CIRCULATE AND CONDITION MUD 1.75 BOTTOMS UP - STAGE PUMPS UP TO CEMENTING RATE AT 7 BPM: - 2 BPM, 350 PSI - 3 BPM, 400 PSI -4 BPM, 470 PSI - 5 BPM, 600 PSI -6 BPM, 710 PSI - 7 BPM, ICP 820 PSI - FCP 755 PSI RECIPROCATE PIPE 30' ON SURFACE Printed 817/2018 4:43:50PM 'All depths reported in Drillers Depths' Common Well Name: 11-23 Event Type: RE-ENTER- OI Project: PBU North America -ALASKA - BP Operation Summary Report Page 19 of 31 AFE Na (RON) Start Date: 4/24/2018 End Date. 5/16/2018 X3 -018Y4 -C. (5,086 993 00 ) Site: 11- Rig Contractor: PARKER DRILLING CO. Active datum: 11-23B Actual @74.BOusft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth (hr) (usft) 15:30 - 18:00 2.50 CASING P 10,617.45 BPUOI: USA00001229 Phase Descripbon of Operations INTI CEMENT 7", 26 #/FT, L-80 VAMTOP HC LINER PER APPROVED SLB CEMENTICS MODEL -PERFORM PRESSURE CROSSCHECK CHECKLISTAND PRESSURE TEST SURFACE LINES TO 250 PSI LOW AND 4500 PSI HIGH FOR 5 MIN - PUMP 40 BBLS OF 12 PPG MUDPUSH II SPACER @ 5 BPM, 460 - 250 PSI - LAUNCH BOTTOM DRILL PIPE WIPER DART - PUMP 96.8 BBLS OF 75.8 PPG CLASS G TAIL (YIELD 1.16 DU.FT/S K) @ 5 BPM, 600 PSI P N H TOP DRILL PIPE WI ER UART AND KICK OUT WITH 10 BBLS OF FRESH WATER DID NOT OBSERVE FIRST DART LATCH RECIPROCATE 30' AT SURFACE WHILE PUMPING CEMENT PERFORM DISPLACEMENT WITH RIG PUMPS AND 10,3 PPG _SND AT 7 BPM - @ 85 BBLS AWAY, REDUCE RATE TO 3 BPM FOR 10 BBLS TO LATCH UP SECOND DART, DID NOT OBSERVE SECOND DART LATCH - @ 245 BBLS AWAY, REDUCE RATE TO 3 BPM TO BUMP THE PLUG, ICP 875 PSI, FCP 975 PSI - DID NOT OBSERVE LATCH FOR FIRST OR SECOND DART, CONTINUE TO PUMP DISPLACEMENT BASED ON CALCULATED STROKES -OBSERVE BOTTOM PLUG LAND AND BURST @ 160 BBLSAWAY: DID NOT CORRECT FINAL STROKES FOR BUMP - REDUCE RATE TO 3 BPM PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE 975 PSI - DISPLACEMENT FLUID: 252.5 BBLS OF 10.5 PPG _SND (MEASURED BY STROKES @ 96% PUMP EFFICIENCY) - TOTAL DISPLACEMENT VOLUME 262 BBLS INCLUDING THE 10 BBLS OF WATER FROM SLB - RECIPROCATE 30' AT SURFACE DURING DISPLACEMENT, OBSERVE SLACK OFF WEIGHTS TRENDING LOWER, PARK LINER ON SET DEPTH AT 10615' MD, 227 BBL INTO DISPLACEMENT - TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE: 0 BBL - INCREASE PRESSURE TO 1475 PSI, 500 PSI OVER PLUG BUMP - FIELD PICK TOC 8480' MD, GAUGE HOLE BLEED OFF PRESSURE AND CHECK FLOATS - HOLDING CEMENT IN PLACE AT 17:39 HRS SEEATTACHED CEMENT DOCUMENTATION Printed 6/7/2018 4A3:50PM 'All depths reported in Drillers Depths' Common Well Name: 11-23 Event Type: RE-ENTER- ONSHORE (RON) Project PBU North America - ALASKA - BP Operation Summary Report Start Date: 4/24/2018 Site: 11 End Date. 5/16/2018 AFE No K3 -018Y4 -C:(6,086.993,00) Page 20 of 31 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 18:00 - 18:30 0.50 CASING P 10,617.45 INTI SET LINER HANGER, RELEASE FROM LINER, AND SET LINER TOP PACKER - PRESSURE UP 702800 PSI - SLACK OFF TO 70K STING WEIGHT (LAST OBSERVED SLACK OFF WEIGHT= 155 KLBS) - PRESSURE UP TO 3600 PSI - BLEED PRESSURE OFF - PICK UP 10' TO EXPOSE DOGS, PICK UP WEIGHT 160 KLBS (LAST OBSERVED PU 325K), GOOD INDICATION RUNNING TOOL RELEASED FROM LINER - WITH DOGS EXPOSED INITIATE ROTATION AND SET DOWN ON LINER TOP TO 53 KLBS, OBSERVE GOOD INDICATION LINER TOP PACKER SET - PRESSURE UP TO 500 PSI AND PULL OUT OF LINER WITH LINER RUNNING TOOL, INCREASE RATE TO 13 BPM, 1400 PSI ONCE LINER RUNNING TOOL IS OUT OF LINER HANGER 18:30 - 19:00 0.50 CASING P 10 61745 INTI CIRCULATE NUTPLUG SWEEP SURFACE TO SURFACE TO CLEAN ANY RESIDUAL CEMENT OUT OF PIPE - 13 BPM, 1400 PSI '- LAY DOWN CEMENT HEAD 1900 - 2330 4.50 CASING P 10.61745 INTI PULL OUT OF THE HOLE ON ELEVATORS FROM THE LINER TOPAT 8285' MD TO SURFACE - MONITOR THE WELL FOR 10 MIN (STATIC) - LAY DOWN LINER RUNNING TOOL, DOGS WERE OUT, NO DAMAGE OR MISSING PARTS SIMOPS: - PRESSURE TEST CHOKE MANIFOLD _OFFLINE 23:30 - 00:00 0.50 CASING P 10,617.45 INT1 CLEAN AND CLEAR RIG FLOOR 5/7/2018 0000 - 0200 2.00 WHSUR P 10,617.45 INTI RIG UP TO TEST THE TUBING HANGER SEAL AREA IN THE TUBING HEAD -PULL WEAR BUSHING -SET TEST PLUG - FILL THE STACK WITH WATER - CLOSE BLIND RAMSAND PRESSURE UP TO 1000 PSI - CAMERON REP ON LOCATION TO RUN IN LOCK DOWN SCREWS - PRESSURE TEST THE TUBING HANGER SEALAREA IN THE TUBING HEAD WITH THE TEST PLUG TO 250 PSI LOWAND 3500 PSI HIGH FOR 5 MIN EACH (PASS) SIMOPS: - PRESSURE TEST CHOKE MANIFOLD OFFLINE Printed 6!72018 4:43:50PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 21 of 31 Common Well Name: 11-23 - 02:00 1.00 BOPSUR N 0200 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date'. 4/24/2018 End Date. 5/16/2018 X3 -018Y4 -C: (6,086,993.00 ) Project: PBU 1.00 Site: 11 P INTI INSTALLAIR BOOTSAND FLOW RISER - FILL STACK WITH WATER AND BLEED AIR Rig Name/No.: PARKER 272 FROM LINES Spud Date/Time: 7/11/1986 12:00:00AM INTI PRESSURE TEST THEANNULAR TO 250 PSI Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. - TEST WITH 2-7/8" AND 4-1/2" TEST JOINTS (PASSING TESTS) 10,617.45 BPUOI: USA00001229 Active datum: 11-23B Actual @74.60us8 (above Mean Sea Level) TO TEST THE 7" LINER 10,61745 INTI PRESSURE TEST THE 7- INTERMEDIATE, Date From - To Hire Task Code NPT Total Depth Phase Description of Operators (hr) 10,617.45 INTI PICK UP6-1/8" PRODUCTION HOLE DRILLING (usfl) _ BHA TO A TOTAL LENGTH OF 151' MD 0200 - 0430 2.50 13OPSUR P 10,617.45 IE NTI CHANG OUT UPPER RAMS IN BOP STACK - PU 40 KLBS, SO 40 KLBS FROM 4-1/2" X 7" VBR TO 2-7/8" X 5" VBR - BARRIERS FOR BREAKING CONTAINMENT TO CHANGING OUT UPPER RAMS: - CLOSED BLIND / SHEAR RAMS - KILL WEIGHT FLUID, MONITORED THROUGH THE SECONDARY KILL LINE WITH CONTINUOUS HOLE FILL WITH A CHARGE PUMPANDAN OPEN BLEEDER TO AN ISOLATED ACTIVE PIT 1 (STATIC) SIMOPS: CHANGE OUT SAVER SUB AND PIPE HANDLER ON THE TOP DRIVE - REMOVE ALL WIRED PIPE COMPONENTS - LEAVE STRING SENSE ON TOP DRIVE 0430 - 1000 5.50 BOPSUR P 10,617.45 1 INTI COMPLETE CHANGING OUT SAVER SUB AND '_PIPE HANDLER ON TOP DRIVE 10:00 - 16:30 6.50 BOPSUR P 10,617.45 INTI TEST BORE TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 2-7/8"AND 4-1/2"TEST JOINTS -ALL TESTS CHARTED, SEE ATTACHED BOP TESTCHARTS - 1 FAILURE, ANNULAR PREVENTER -TEST WITNESS WAIVED BY AOGCC REP LOU LAUBENSTEIN _ 1630 - 0000 7.50 r BOPSUR N 10,617.45 INTI CHANGE OUTANNULAR PREVENTER ELEMENT - MONITOR WELLTHROUGH THE 5/8/2018 00:00 - 01:00 1.00 N 01:00 - 02:00 1.00 BOPSUR N 0200 - 03:300 1.50 WHSUR P 03:30 - 04:30 1.00 CASING P 0430 - 0700 2.50 DRILL P Printed 61'7/2018 4.43:50PM *All depths reported in Drillers Depths* SECONDARY KILL LINE WITH CONTINUOUS HOLE FILL WITH A CHARGE PUMPAND AN OPEN BLEEDER TO AN ISOLATED ACTIVE PIT 1 (STATIC) SIMOPS: - LAY DOWN STANDS OF 5" DRILLPIPE WITH OFFLINE EQUIPMENT 10,617.45 INTI INSTALLAIR BOOTSAND FLOW RISER - FILL STACK WITH WATER AND BLEED AIR FROM LINES 10,61745 INTI PRESSURE TEST THEANNULAR TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH - TEST WITH 2-7/8" AND 4-1/2" TEST JOINTS (PASSING TESTS) 10,617.45 INT1 RIG DOWN TESTING EQUIPMENT, PULL TEST PLUG, SET WEAR BUSHING AND PREPARE TO TEST THE 7" LINER 10,61745 INTI PRESSURE TEST THE 7- INTERMEDIATE, LINER AND LINER TOP PACKER TO 3500 PSI _ HIGH FOR 30 MIN - CEMENT @ 500 PSI COMPRESSIVE STRENGTH BY 01:48 ON 05107/2018 -TEST APPROVED BY WSUP 10,617.45 INTI PICK UP6-1/8" PRODUCTION HOLE DRILLING BHA TO A TOTAL LENGTH OF 151' MD - 6-1/8" SKC613M PDC BIT, AUTOTRAK, MWD/LWD (GAM/RES/PRESIVSS/SU RVEY/DEN/N EU/CALI PER) - PU 40 KLBS, SO 40 KLBS Printed 61'7/2018 4.43:50PM *All depths reported in Drillers Depths* Printed 6/7/2018 4:43:50PM *All depths reported in Drillers Depths" North America - ALASKA - BP Page 22 of 31 Operation Summary Report Common Well Name. 11-23 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Dale. 4/24/2018 End Date: 5/16/2018 X3-01 BY4-C: (6,086,993.00 ) Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud Daterrime: 7/11/1986 12:00:00AM Rig Release: 5120/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74 60usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 07:00 - 08:00 1.00 DRILL P 10,617.45 INTI RUN IN HOLE WITH 6-1l8" RSS ASSEMBLY FROM 151'MD TO 1560'MD 08:00 - 08:30 0.50 DRILL P 10,617.45 INTI SHALLOW HOLE TEST MWD TOOLS AT 767' MD: GOOD TEST - 300 GPM, 1560 PSI _ - PU 60 KLBS, SO 60 KLBS 08:30 - 13:30 5.00 DRILL P 10,617.45 INTI CONTINUE RUNNING IN THE HOLE WITH BHA #5 ON 4" DRILL PIPE STANDS FROM 1560' MD TO 10407' MD - FILL PIPE EVERY 20 STANDS - MONITOR DISPLACEMENT WITH TRIP TANK GOOD DISPLACEMENT -MUDWEIGHT IN/OUT=10.3PPG 1330 - 21:00 7.50 DRILL P 10,617.45 INTI WASH DOWN FROM 10407' MD AND DRILL PLUGS, LANDING COLLAR AND CEMENT TO 10605' MD (10' FROM 7" LINER SHOE) • •-WASH DOWN AND TAG LINER WIPER PLUGS AT 10527' MD DRILL LINER WIPER PLUGS AND LANDING COLLAR FROM 12872' MO TO 12878' MD - VARY PARAMETERS TO GET PLUGSAND LANDING COLLAR TO DRILL UP -250 GPM, 1975 PSI .70 RPM, 12-17 KFT-LBS TORQUE -6-19 KLBS WOB -MUD WEIGHT IN/OUT= 10.3 PPG - OBSERVED RUBBER PLUGS AND ALUMINUM OVER SHAKERS 2100 - 23:00 2.00 DRILL P 10,617.45 INT1 DISPLACE WELL FROM 10.3 PPG LSND TO 8.5 PPG QUIK DRILL -300 GPM @2670 PSI ICP, 1445 FCP -WORK PIPE AT 1000 FPH -70 RPM@ 12K TORQUE -FLOW CHECK WELL FOR 15 MINUTES, STATIC -WSUPAPPROVAL TO PROCEED. 23:00 - 2330 0.50 DRILL P 10617.45 INTI SERVICE TOP DRIVE -23:30 - 00:00 0.50 DRILL P 10,617.45 INTI DRILL OUT REMAINING SHOE TRACK FROM 10605' TO 10615' -300 GPM@ 1390 PSI -60 RPM @9K TORQUE -10K WOB -PU WT 194K,SO WT 137K -FLOW CHECK WELL FOR 15 MINUTES,STATIC. 5/9/2018 00:00 - 0030 0.50 DRILL P 10,637 45 INTI DRILL 20' NEW HOLE FROM 10817' TO 10637' -300 GPM@ 1520 PSI -100 RPM @13K TORQUE -10K WOB -PU WT 200K,SO WT 133 00:30 - 01:00 0.50 DRILL P 10,63745 INTI CIRCULATE IX BOTTOMS UP TO CLEAN UP THE HOLE - 300 GPM, 1520 PSI _ 01:00 - 02:30 1.50 DRILL P 10,637.45 INTI PERFORM FIT TO 10.0 PPG -MUD WT 8.5 PPG, iV6 8314, PRESSURE 650 PSI -PUMP 1.5 BBLS, 1.5 BELS BACK -TEST APPROVED BY ODE Printed 6/7/2018 4:43:50PM *All depths reported in Drillers Depths" Common Well Name. 11-23 Event Type: RE-ENTER- ONSHORE (RON) Project: PBU Rig Name/No.: PARKER 272 Rig Contractor: PARKER DRILLING CO. Active datum: 11-23B Actual @74.60usfl (ahoy Date From - To Him _— (hr) 02:30 - 12:00 9.50 North America - ALASKA- BP Operation Summary Report Start Date: 4/24/2018 Site: 11 Mean Sea Level) Task Code DRILL P 1200'. - 0000 1200.DRILL P Page 23 of 31 1 End Date: 5/16/2018 X3 -018Y4 -C: (6,086,993.00 ) BPUOI: USA00001229 NPT Total Depth Phase Description of Operations (usft) 11,09745 PROD1 DIRECTIONALLY DRILL 6-1/8'; PRODUCTION HOLE SECTION FROM 10637' MD TO 11097' MD (8652' TVD), - 460 FT IN 9.5 HRS = 48.4 FT/HR WITH CONNECTIONS -INSTANTANEOUS ROP 34-200 FPH - 300 GPM, 1630 PSI ON/OFF BOTTOM - 150 RPM, 16 KFT-LBS TORQUE ON BOTTOM, 14 KFT-LBS TORQUE OFF BOTTOM, 7-15 KLBS WOB - PU = 225 KLBS, SO = 126 KLBS, ROT = 161 KLBS - SURVEY EVERY 30 FT -ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 8.6 PPG - GAS WATCH: AVG BACKGROUND 24 UNITS, _ MAX 789 UNITS_ 11,568.45 PROD1 DIRECTIONALLY DRILL 6-1/8" PRODUCTION HOLE SECTION FROM 11097 MD TO 11568' MD (8772' TVD), -471 FT IN 12.0 HIPS =39.3 FT/HR WITH CONNECTIONS '-INSTANTANEOUS ROP 34-100 FPH - 300 GPM, 1740 PSI ON/OFF BOTTOM - 150 RPM, 18 KFT-LBS TORQUE ON BOTTOM, 15 KFT-LBS TORQUE OFF BOTTOM, 15-20 KLBS WOB - PU = 230 KLBS, SO = 128 KLBS, ROT = 162 KLBS - SURVEY EVERY 30 FT -ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 8.6 PPG - GAS WATCH: AVG BACKGROUND 70 UNITS, MAX 339 UNITS Printed 8/7/2018 4AT50PM "All depths reported in Drillers Depths` SWEEPS: -35 BBL HIGH -VIS SWEEP AT 11757' MD, 25% INCREASE IN CUTTINGS OBSERVED -35 BBL HIGH -VIS SWEEP AT 12350' MD, NO -SIGNIFICANT INCREASE OBSERVED 12:00 - 00:00 12.00 DRILL P 13,018.45 PROD1 DIRECTIONALLY DRILL 6-1J8" PRODUCTION HOLE SECTION FROM 12387' MD TO 13018' MD (8750' TVD) - 631 FT IN 12.0 HRS = 52-6 FT/HR WITH CONNECTIONS - INSTANTANEOUS ROP 50 - 110 FPH - 325 GPM, 2110 PSI ON/OFF BOTTOM -150 RPM, 18 KFT-LBS TORQUE ON BOTTOM, j 16 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS WOB - PU = 225 KLBS, SO = 125 KLBS, ROT = 158 KLBS - SURVEY EVERY 90 FT -ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 8.7 PPG - GAS WATCH: AVG BACKGROUND 140 UNITS, MAX 381 UNITS SWEEPS: - 35 BBL LOW -VIS 135 BBL HIGH VIS TANDEM SWEEPAT 12895' MD, 75% INCREASE IN CUTTINGS OBSERVED Pnnted 6/7/2018 4:43:50PM *All depths reported in Drillers Depths` North America - ALASKA - BP Page 24 of 31 Operation Summary Report Common Well Name: 11-23 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 End Date: 5/16/2018 X3 -016Y4 -C: (6,086,993.00 ) Project: PBU - - Site: 11 Rig Name/No.: PARKER 272 Spud Date/rime: 7/11/1986 12:00 OOAM Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74.60us8 (above Mean Sea Level) Date From - To Him Task Cade NPT Total Depth Phase Description of Operations (hr) _ _ (usft) 5/10/2018 00:00 - 12:00 12.00 DRILL P 12,387.45 PROD1 OIRECTIONALLY DRILL 6-1/8" PRODUCTION HOLE SECTION FROM 11568' MD TO 12387' MD (8763' TVD) - 819 FT IN 12.0 HRS = 68.3 FT/HR WITH CONNECTIONS -INSTANTANEOUS ROP 50-125 FPH - 300-325 GPM, 1750-2093 PSI ON/OFF BOTTOM - 150 RPM, 18 KFT-LBS TORQUE ON BOTTOM, 16 KFT-LBS TORQUE OFF BOTTOM, 10-20 KLBS WOB - PU = 230 KLBS, SO = 128 KLBS, ROT = 159 KLBS - SURVEY EVERY 90 FT '- ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED -MUD WEIGHT IN/OUT=8.6+PPG - GAS WATCH: AVG BACKGROUND 120 UNITS, MAX 354 UNITS SWEEPS: -35 BBL HIGH -VIS SWEEP AT 11757' MD, 25% INCREASE IN CUTTINGS OBSERVED -35 BBL HIGH -VIS SWEEP AT 12350' MD, NO -SIGNIFICANT INCREASE OBSERVED 12:00 - 00:00 12.00 DRILL P 13,018.45 PROD1 DIRECTIONALLY DRILL 6-1J8" PRODUCTION HOLE SECTION FROM 12387' MD TO 13018' MD (8750' TVD) - 631 FT IN 12.0 HRS = 52-6 FT/HR WITH CONNECTIONS - INSTANTANEOUS ROP 50 - 110 FPH - 325 GPM, 2110 PSI ON/OFF BOTTOM -150 RPM, 18 KFT-LBS TORQUE ON BOTTOM, j 16 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS WOB - PU = 225 KLBS, SO = 125 KLBS, ROT = 158 KLBS - SURVEY EVERY 90 FT -ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED DUE TO SOFTWARE ISSUES, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 8.7 PPG - GAS WATCH: AVG BACKGROUND 140 UNITS, MAX 381 UNITS SWEEPS: - 35 BBL LOW -VIS 135 BBL HIGH VIS TANDEM SWEEPAT 12895' MD, 75% INCREASE IN CUTTINGS OBSERVED Pnnted 6/7/2018 4:43:50PM *All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Page 25 of 31 Common Well Name: 11-23 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 End Date. 5/16/2018 X3 -018Y4 -C: (6,086,993.00 ) Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud Daterrime: 7/11/1986 12:00oDAM Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23BActual @74.60usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 5/11/2018 00:00 - 12:00 12.00 DRILL P 13,617.45 PROD1 DIRECTIONALLY DRILL 6-1/8" PRODUCTION 1200 - 1600 4.00 1606 - 1836 250 HOLE SECTION FROM 13018' MD TO 13617' MD (8731' TVD) - 599 FT IN 12.0 HRS = 49.9 FT/HR WITH CONNECTIONS - INSTANTANEOUS ROP 50-100 FPH - 325 GPM, 2275 PSI ON/OFF BOTTOM - 150 RPM, 16 KFT-LBS TORQUE ON BOTTOM, 14 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS WOB - PU = 218 KLBS, SO = 126 KLBS, ROT = 158 KLBS - SURVEY EVERY 30-90 FT AS REQUIRED -ZERO LOSSES WHILE DRILLING AHEAD - NOVOS ENABLED, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 8.7+ PPG - GAS WATCH: AVG BACKGROUND 117 UNITS, MAX 315 UNITS SWEEPS: '- 35 BBL LOW -VIS / 35 BBL HIGH VIS TANDEM SWEEP AT 13450' MD, 75% INCREASE IN _ CUTTINGS OBSERVED DRILL P 13,75045 PROD? DIRECTIONALLY DRILL 6-118" PRODUCTION HOLE SECTION FROM 13617' MD TO 13750' MD (8710' TVD) -133 FT IN 4.0 HRS = 33.3 FT/HR WITH CONNECTIONS - INSTANTANEOUS ROP 50-100 FPH - 325 GPM, 2280 PSI ON/OFF BOTTOM - 150 RPM, 17 KFT-LBS TORQUE ON BOTTOM, 13 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS WOB PU = 230 KLBS, SO = 125 KLBS, ROT = 158 KLBS - SURVEY EVERY 30-90 FT AS REQUIRED -ZERO LOSSES WHILE DRILLING AHEAD - NOVOS ENABLED, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 8.7+ PPG - GAS WATCH: AVG BACKGROUND 120 UNITS, MAX 315 UNITS TURNED UP TO 100° IN AN ATTEMPT TO LOCATE RESERVOIR SANDS AGAIN. RE-ENTERED RESERVOIR SANDSAT 13690' MD (8722' TVD), -700' OF SHALE EXPOSED. DISCUSSED WITH ODE AND N WD TEAM. DECISION MADE TO OPENHOLE SIDETRACK BACK UP AT 11287' MD. DRILL N 13.750 45 PROD1 PULL ON ELEVATORS FROM 13750' MD TO 10520' MD, INSIDE 7" INTERMEDIATE LINER - PU = 230 KLBS, SO = 125 KLBS AT 13750' MD - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM: STATIC - MONITOR WELL FOR 10 MIN AT 7" LINER SHOE: STATIC - HOLE TAKING PROPER FILL WHILE PULLING - MUD WEIGHT IN/OUT = 8.7+ PPG - OBSERVED OVERPULLS UP TO 35 KLBS OVER FROM 13750' MD TO 12700' MD Printed 6/7/2018 4:43:5oPM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 26 of 31 Common Well Name: 11-23 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date'. 4/24/2018 End Date. 5/16/2018 X3 -018V4 -C: (6,086,993.00 ) Project: PBU --- - ---- Site. 11 -- Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 12:00 OOAM Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. SPUOI: USA00001229 Active datum: 11-23BActual @74.60usR (above Mean Sea Level) Date From - To His Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 18:30 - 19:30 1.00 DRILL N 13,750.45 PROD1 CIRUCLATE IX BOTTOMS UP INSIDE 7" INTERMEDIATE LINER - 300 GPM, 1730 PSI _ - MUD WEIGHT IN/OUT = 8.7+ PPG 19:30 - 20:00 0.50 DRILL N 13,750.45 PROW INSPECT AND SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT 2000 - 2030 0.50 STKOH N 13,750.45 PROD1 RUN IN THE HOLE ON ELEVATORS FROM 10520' MD TO OPENHOLE SIDETRACK DEPTH AT 11287' MD AND MARK PIPE - PU = 208 KLBS, SO = 130 KLBS AT 10520' MD - MONITOR DISPLACEMENT WITH TRIP TANK GOOD DISPLACEMENT --MUD WEIGHT IN/OUT =8.7+PPG 20:30 - 00:00 3.50 STKOH N 13,750.45 PROD1 BEGIN TROUGHING FOR OPENHOLE SIDETRACK PER APPROVED OCN #6 AND BAKER DIRECTIONAL PROCEDURE - PU = 220 KLBS, SO = 120 KLBS, ROT = 160 KLBS - 100 RPM, 14-15 KFT-LBS TORQUE - 250 GPM, 1400 PSI ON/OFF BOTTOM - DOWNLINK TO STEER MODE, SD = 180, SF = 100% - REAM UP 30', REAM BACK TO MARKAT 60 FT/HR - REAM UP 3, REAM BACK TO MARKAT 30 FT/HR - REAM UP 6', REAM BACK TO MARKAT 30 FT/HR - REAM UP 15', REAM BACK TO MARKAT 30 FT/HR - REAM UP 30', REAM BACK TO MARKAT 30 FT/HR - NO REAL INDICATIONS OF INCREASED _ SLEEVE ROTATION 5112/2018 00.00 - 02.30 2.50 STKOH N 13,750.45 PROD1 CONTINUE TROUGHING FOR OPENHOLE SIDETRACK PER APPROVED OCN #6 AND BAKER DIRECTIONAL PROCEDURE -CONTINUE TROUGHING IN INCREMENTES DUE TO NO INDICATIONS OF INCREASED SLEEVE ROTATION - 100 RPM, 14-15 KFT-LBS TORQUE - 250 GPM, 1400 PSI ON/OFF BOTTOM - REAM UP 30', REAM BACK TO MARKAT 30 FT/HR - REAM UP 15', REAM BACK TO MARKAT 30 FT/HR - REAM UP 7', REAM BACK TO MARKAT 30 FT/HR - REAM UP 6', REAM BACK TO MARKAT 30 FT/HR 02 30 - 05.00 2.50 STKOH N 13,750.45 PROD1 CONTINUE OPENHOLE SIDETRACK PER APPROVED OCN #6 AND BAKER DIRECTIONAL PROCEDURE - DOWNLINK RIBS OFF ON AUTOTRAK - REAM FROM 11257' MD TO 11287' MD (30') 3X AT 60 FT/HR -100 RPM, 13 KFT-LBS TORQUE - 250 GPM, 1350 PSI ON/OFF BOTTOM Printed 6!7/2018 4:43:50PM *All depths reported in Drillers Depths' North America - ALASKA - BP Page 27 of 31 Operation Summary Report Common Well Name: 11-23 --- _ AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date: 4/24/2018 End Date. 5/16/2018 X3 -018Y4 -C. (6,086,993.00 ) Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud Date7rime: 7/11/1986 12:00:00AM Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74.60usR (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ (usit) _ 05:00 - 05:30 0.50 STKOH N 13,750.45 PROD1 CONTINUE OPENHOLE SIDETRACK PER APPROVED OCN #6 AND BAKER DIRECTIONAL PROCEDURE - WITH RIBS OFF, SITAND ROTATE AT 1128T MD WITH NO RECIPROCATION FOR 30 MIN - 100 RPM, 13 KFT-LBS TORQUE - 250 GPM, 1370 PSI ON/OFF BOTTOM 05:30 - 20:30 15.00 STKOH N 13,750.45 PROD? BEGIN TIME DRILLING FOR OPENHOLE SIDETRACK PER APPROVED OCN #6 AND BAKER DIRECTIONAL PROCEDURE - 120 RPM, 11 KFT-LBS TORQUE 1 '- 250 GPM, 1350-1240 PSI ON/OFF BOTTOM - DRILL 0.5 FT/HR FOR 2 HRS - DRILL 1 FT/HR FOR 4 HRS TO 11292' MD - DRILL 2 FT/HR FOR 4 HRS TO 11300' MD - DRILL 4 FT/HR FOR 2 HRS TO 11308' MO - DRILL 8 FT/HR FOR 1 HRS TO 11316' MD DRILL 16 FT/HR FOR 1 HR TO 11327' MD - GOOD INDICATION OF SEPERATION WITH NEAR BIT INC ^4° LESS AT 11314' MD _ 2030'. - 0000 3.50 DRILL N 13,750.45 1 PROD1 DIRECTIONALLY DRILL 6-1/8" PRODUCTION HOLE SECTION FROM 11327' MO TO 11442' MD (8888' TVD) -115 FT IN 3.5 HRS =32.9 FT/HR WITH 'CONNECTIONS -INSTANTANEOUS ROP 15-50 FPH - 300 GPM, 1620 PSI ON/OFF BOTTOM - 120 RPM, 12 KFT-LBS TORQUE ON BOTTOM, 9 KFT-LBS TORQUE OFF BOTTOM, 10-15 KLBS WOB li - PU = 200 KLBS, SO = 140 KLBS, ROT = 162 KLBS - SURVEY EVERY 30 FT AS REQUIRED -ZERO LOSSES WHILE DRILLING AHEAD - NOVOS DISABLED, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 8.6 PPG - GAS WATCH: AVG BACKGROUND 60 UNITS, MAX 162 UNITS _ 5/13/2018 00.00 - 1200 12.00 DRILL N 13,750.45 PROD1 DIRECTIONALLY DRILL6-1/8"PRODUCTION HOLE SECTION FROM 11442' MD TO 12103' MD (8766' TVD) - 661 FT IN 12.0 HRS = 55.1 FT/HR WITH CONNECTIONS - INSTANTANEOUS ROP 50-125 FPH - 300-325 GPM, 1660-1905 PSI ON/OFF BOTTOM - 120-150 RPM, 12-15 KFT-LBS TORQUE ON BOTTOM, 9-11 KFT-LBS TORQUE OFF BOTTOM, 10-20 KLBS WOB - PU = 203 KLBS, SO = 137 KLBS, ROT = 162 KLSS - SURVEY EVERY 30-90 FT AS REQUIRED .- LOSSES WHILE DRILLING AHEAD <5 BPH - NOVOS ENABLED FOR <50% OF DRILLING TIME, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 8.6 PPG - GAS WATCH: AVG BACKGROUND 120 UNITS, MAX 598 UNITS Printed 6/7/2018 4:43:50PM 'All depths reported in Drillers Depths' SWEEPS: - 35 BBL LOW -VIS / 35 BBL HIGH VIS TANDEM SWEEP AT 12800' MD, NO INCREASE IN CUTTINGS OBSERVED - 35 BBL LOW -VIS / 35 BBL HIGH VIS TANDEM SWEEP AT 13400' MD, NO INCREASE IN CUTTINGS OBSERVED Printed 6/7/2018 4:43:50PM *All depths reported In Drillers Depths' NorthAmerica- ALASKA - BP Page 28 of 31 Operation Summary Report Common Well Name'. 11-23 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 4/24/2018 End Date: 5/16/2018 X3 -018Y4 -C: (6,086,993.00 ) Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud Daterrime: 7/11/1986 12:00 OOAM Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date's From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) - (usft) _. 12:00 - 00:00 12.00 DRILL N 13,750.45 PROD1 DIRECTIONALLY DRILL 6-1/8" PRODUCTION HOLE SECTION FROM 12103' MD TO 12829' li MD (8738' TVD) -726 FT IN 12.0 HRS =60.5 FT/HR WITH CONNECTIONS -INSTANTANEOUS ROP 75-125 FPH - 325 GPM, 2000 PSI ON/OFF BOTTOM -150 RPM, 16 KFT-LBS TORQUE ON BOTTOM, 15 KFT-LBS TORQUE OFF BOTTOM, 15-20 KLBS WOB - PU = 212 KLBS, SO = 126 KLBS, ROT = 161 KLBS -SURVEY EVERY 30-90 FT AS REQUIRED - LOSSES WHILE DRILLING AHEAD <5 BPH '- NOVOS ENABLED, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 8.6 PPG - GAS WATCH: AVG BACKGROUND 200 UNITS, _ MAX 494 UNITS 5/14/2018 00:00 - 15-.30 15.50 DRILL N 13,750.00 PROD? DIRECTIONALLY DRILL 6-1/8"PRODUCTION HOLE SECTION FROM 12829' MD TO 13750' MD(8716'TVD) -921 FT IN 15.5 HRS =59.4 FT/HR WITH CONNECTIONS '- INSTANTANEOUS ROP 50-100 FPH -325 GPM, 2130 PSI ON/OFF BOTTOM -150 RPM, 16 KFT-LBS TORQUE ON BOTTOM, 15 KFT-LBS TORQUE OFF BOTTOM, 15-20 KLBS WOB - PU = 205 KLBS, SO = 129 KLBS, ROT = 160 KLBS - SURVEY EVERY 90 FT AS REQUIRED -LOSSES WHILE DRILLING AHEAD <5 BPH - NOVOS ENABLED, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 8.6+ PPG - GAS WATCH: AVG BACKGROUND 295 UNITS, MAX 468 UNITS SWEEPS: - 35 BBL LOW -VIS / 35 BBL HIGH VIS TANDEM SWEEP AT 12800' MD, NO INCREASE IN CUTTINGS OBSERVED - 35 BBL LOW -VIS / 35 BBL HIGH VIS TANDEM SWEEP AT 13400' MD, NO INCREASE IN CUTTINGS OBSERVED Printed 6/7/2018 4:43:50PM *All depths reported In Drillers Depths' Common Well Name: 1-1-.23— Event Type: RE-ENTER- ONSHORE(RON) Proiect: PBU North America - ALASKA - BP Operation Summary Report Start Date: 4/24/2018 Site: 11 End Date 5)1612018 AFE No X3 -018Y4 -C: (6,086,993.00 ) i Rig Name/No.: PARKER 272 Spud DateRme: 7/11/1986 12'.00:OOAM I Rig Release: 5/20/2018 Active datum: 11-23B Actual (g?74.60usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth __ _ (hr) (usft) 15:30 - 00:00 8.50 DRILL P 14,341.00 5/15/2018 00:00 - 14:30 14.50 DRILL P 15,157.00 Page 29 of 31 Phase Description of Operations PROD1 DIRECTIONALLY DRILL 6-1/8" PRODUCTION HOLE SECTION FROM 13750' MD TO 14341' MD (8685' TVD) - 591 FT IN 8.5 HRS = 69.5 FT/HR WITH CONNECTIONS - INSTANTANEOUS ROP 100-125 FPH - 325 GPM, 2170 PSI ON/OFF BOTTOM - 150 RPM, 18 KFT-LBS TORQUE ON BOTTOM, 16 KFT-LBS TORQUE OFF BOTTOM, 15-20 KLBS WOB - PU = 215 KLBS, SO = 125 KLBS, ROT = 155 KLBS -SURVEY EVERY 30-90 FT AS REQUIRED - LOSSES WHILE DRILLING AHEAD 5-8 BPH - NOVOS ENABLED, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 8.6+ PPG - GAS WATCH: AVG BACKGROUND 280 UNITS, '., MAX 560 UNITS SWEEPS: '- 35 BBL HIGH VIS SWEEP AT 13937' MD, 25% INCREASE IN CUTTINGS OBSERVED PRODi DIRECTIONALLY DRILL S-1/8" PRODUCTION HOLE SECTION FROM 14341' MD TO 15157' 617' TVD - 816 FT IN 14.5 HRS = 56.3 FT/HR WITH CONNECTIONS -INSTANTANEOUS ROP 75-100 FPH - 325 GPM, 2330 PSI ON/OFF BOTTOM -150 RPM, 19.5 KFT-LBS TORQUE ON BOTTOM, 16 KFT-LBS TORQUE OFF BOTTOM, 15-20 KLBS WOB - PU = 215 KLBS, SO = 130 KLBS, ROT = 154 KLBS - SURVEY EVERY 30-90 ETAS REQUIRED - LOSSES WHILE DRILLING AHEAD 15-20 BPH - NOVOS ENABLED, SOFTSPEED ENABLED - MUD WEIGHT IN/OUT = 8.6+ PPG - GAS WATCH: AVG BACKGROUND 330 UNITS, MAX 654 UNITS SWEEPS: - 35 BBL HIGH VIS SWEEP AT 14590' MD, 25% INCREASE IN CUTTINGS OBSERVED SIMOPS: PERFORM WEEKLY ROPE FUNCTION TEST BETWEEN CONNECTIONS: CLOSING TIMES: ANNULAR = 29 SEC, UPPER RAMS = 7 SEC, LOWER RAMS = 7 SEC, CHOKE AND KILL HCR = 1 SEC EACH BLIND / SHEAR RAMS TO BE FUNCTIONED WHEN OUT OF THE HOLE Printed SU12018 4:43:50PM *All depths reported in Drillers Depths` Printed 617/2018 4:43:50PM 'All depths reported in Drillers Depths' North Arnedra - ALASKA - BP Page 30 of 31 Operation Summary Report Common Well Name'. 11-23 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 End Date. 5/16/2018 X3 -018Y4 -C: (6,086,993,00) Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 12:00:00AM Rig Release: 520/2018 Rig Contractor: PARKER DRILLING CO. _BPUOI: USA00001229 Active datum: 11-23B Actual qP74.60usft (above Mean Sea Level) Date From - To Hm Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ 14:30 - 17:30 3.00 DRILL P 15,157.00 PROW CIRCULATE 2z BOTTOMS UP TO CLEAN UP THE HOLE AT TO - PERFORM A 10 MIN FLOW CHECK: -20 BPH STATIC LOSS RATE - 325 GPM, 2250 PSI, 150 RPM, 17 KFT-LBS TORQUE - RACK BACK 4 STANDS TO 14776' MD WHILE CIRCULATING - CIRCULATE ONE 35 BBLS HIGH VIS SWEEP, NO INCREASE IN CUTTINGS - MUD WEIGHT IN/OUT = 8.6+ PPG 17:30 - 20:30 3.00 _ DRILL P 15,157.00 PROD? PULL OUT OF THE HOLE ON ELEVATORS FROM 14776' MD TO 10600' MD, INSIDE THE 7" LINER SHOE - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM: -20 BPH STATIC ,LOSS RATE - PU = 210 KLBS, SO = 128 KLBS AT 14767' MD - MUD WEIGHT IN/OUT = 8.6+ PPG -HOLE TAKING PROPER FILL WHILE PULLING - NO HOLE ISSUES OBSERVED WHILE PULLING VERIFY SIDETRACK JUNCTION: ! - PICK UP TO 11197' MD (90' ABOVE SIDETRACK JUNCTION) - RUN BACK THROUGH SIDETRACK JUNCTION TO 11565' MD AND SURVEY - SURVEY DEPTH 11532' MD IN SIDETRACK WELLBORE MATCHED PREVIOUS SURVEY AT SAME DEPTH: 91.5° INC, 324.6* AZ - SURVEY DEPTH 11533' MD IN ORIGINAL PB1 WELLBORE: 87.1° INC, 331.0* AZ - GOOD INDICATION OF TRACKING INTO NEW WELLBORE CONTINUE PULLING OUT OF THE HOLE ON ELEVATORS TO 10600' MD - MONITOR WELL FOR 10 MIN AT THE 7" SHOE: -20 BPH STATIC LOSS RATE _ 20:30 - 21:30 1.00 DRILL P 15,157.00 PROW CIRCULATE 1x BOTTOMS UP AT THE 7" LINER SHOE - 325 GPM, 1800 PSI - 100 RPM, 6 KFT-LBS TORQUE -MUD WEIGHT IN/OUT =8.6+PPG X21:30 - 00:00 2.50 DRILL P 15,157.00 PROD1 PULL OUT OF THE HOLE ON ELEVATORS FROM 10600' MD TO 6150' MD - MONITOR THE WELL FOR 10 MIN: -20 BPH STATIC LOSS RATE - PU = 210 KLBS, SO = 128 KLBS AT 14767' MD - MUD WEIGHT IN/OUT = 8.6+ PPG - HOLE TAKING PROPER FILL WHILE PULLING - DROP 2.375" OD HOLLOW DRIFTAT 10460' MD Printed 617/2018 4:43:50PM 'All depths reported in Drillers Depths' Printed 6/7/2018 4,43 5OPM •All depths reported in Drillers Depths' North Arnenca - ALASKA- BP Page 31 of 31 Operation Summary Report — - - - -- Common Well Name: 11-23 - - AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 4/24/2018 End Dale: 5/1612018 X3 -018Y4 -C. (6,086,993.00 ) Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud DatefTme: 7/11/1986 12:00:OOAM Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual C74.60usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) --03:00 (usft) 5/16/2018 00:00 3.00 DRILL P 15,157.00 PROD1 CONTINUE TO PULL OUT OF THE HOLE ON ELEVATORS FROM 6150' MD TO 151' MD - PU = 130 KLBS, SO = 100 KLBS AT 6150' MD -MUD WEIGHT IN/OUT=8.6+PPG - HOLE TAKING PROPER FILL WHILE PULLING, - MONITOR THE WELL FOR 10 MIN AT THE HWDP: -20 BPH STATIC LOSS RATE - LAY DOWN THE HWDP AND JARS TO THE PIPE SHED - RE -DROP THE 2.375" OD HOLLOW DRIFT AFTER LAYING DOWN THE JARS 03:00 - 05:00 2.00 DRILL P 15,157.00 PRODi LAY DOWN BHA#5, 6-1/8" RSSASSEMBLY PER BAKER DIRECTIONAL AND MWD REPRESENTATIVES - MONITOR THE WELL FOR 10 MIN PRIOR TO PULLING THE BHA THROUGH THE STACK -15 BPH STATIC LOSS RATE - HOLE TAKING PROPER FILL WHILE PULLING - MUD WEIGHT IN/OUT = 8.6+ PPG - FUNCTION BLIND / SHEAR RAMS TO COMPLETE WEEKLY FUNCTION TEST = 15 SEC TO CLOSE GRADE: e-6-Wi-A-X-I-BT_-T_D__ _ 0500 - 0600 1.00 DRILL P 15,157 00 PRODt _-BIT CLEAN AND CLEAR RIG FLOOR - MOBILIZE DOYON CASING TONGS AND HANDLING EQUIPMENT TO RIG FLOOR START CON EVENT Printed 6/7/2018 4,43 5OPM •All depths reported in Drillers Depths' Common Well Name. 11-23 Phase Description of Operations Event Type. COM- ONSHORE (CON) _SO_=76 _ Project. PBU RUNPRD RIG UP TO RUN LINER Rig Name/No.: PARKER 272 - RIG UP DOYON CASING TONGS WITH Rig Contractor: PARKER DRILLING CO. TORQUE TURN EQUIPMENT Active datum'. 11-23B Actual @74.60usfl (abovr Date From - To Him '- MAKE UP VAMTOP HC XO TO FOSV ON RIG (hr) 5116/2018 06:00 - 06:30 0.50 06'.30 - 1430 8.00 North America - ALASKA - BP Page 1 of 10 Operation Summary Report AFE No Start Date'. 5/16/2018 End Date. 5/20/2018 X3 -018Y4 -C: (2,588,604.00) Site: 11 BPUOI: USAD0001229 Sea Level) Task Code NPT Total Depth Phase Description of Operations (usft) _SO_=76 _ CASING P 15,157.00 RUNPRD RIG UP TO RUN LINER - RIG UP DOYON CASING TONGS WITH TORQUE TURN EQUIPMENT - RIG UP 4-1/2" HANDLING EQUIPMENT CASING P 15,157.00 '- MAKE UP VAMTOP HC XO TO FOSV ON RIG FLOOR _- VERIFY LINER COUNT IN PIPE SHED CASING P 15,157.00 RUN PRD RUN 4-1/2", 12.6#, 13CR85 VAMTOP PRODUCTION LINER TO 4680' - FLOW CHECK WELL PRIOR TO RUNNING IN HOLE (-10 BPH STATIC LOSS RATE) - MAKE UP SHOE TRACK (BAKERLOK • CONNECTIONS) AND CHECK FLOATS (PASS) - APPLY JET -LUBE SEAL GUARD DOPE - MUD WEIGHT IN/OUT = 8.6+ PPG - TORQUE TURN ALL VAMTOP CONNECTIONS - PU = 283 KLBS, SO = 105 KLBS CASING P 15,157.00 • TO OPT MU TORQUE 4440 FT -LBS. MAKE UP JOINTS WITH DOUBLE STACK TONGS. - VAM REPRESENTATIVE VERIFY TORQUE -TURN GRAPHS AND INSPECT CONNECTIONS, ALL CONNECTIONS GOOD - RUN (217) 4-1/2" X 5-3/4" CENTRALIZERS (SHOE TRACK, SPACEOUT PUP, 2 PER JOINT ON 1-106 AND 109-110). ONE FLOATING BETWEEN STOP RINGS 4' AND 10' FROM PIN, AND ONE LOCKED DOWN 13' FROM BOX. - FILL LINER EVERY 20 JTS - MUD WEIGHT IN/OUT = 8.6+ PPG - PU = 75 KLBS, SO = 72 KLBS AT 4680' MD 14:30 - 15:00 0.50 CASING P 15,157.00 RUNPRD MAKE UP WEATHERFORD LINER HANGER / LINER TOP PACKER ASSEMBLY AND CROSS OVER TO 4" DRILL PIPE I -CHANGE FROM 4-1/2" TO 4" ELEVATORS 15:00 - 15:30 I 0.50 1530 - 1900 3.50 19:00 - 19:30 0.50 Printed 6(//2018 4:44:17PM *All depths reported in Drillers Depths' -PU=80 KLBS, KLBS ___ _SO_=76 _ CASING P 15,157.00 RUNPRD FILL PI PE AND CIRCULATE FULL LINER VOLUME - 6 BPM, 225 PSI - MUD WEIGHT IN/OUT = 8.6+ PPG CASING P 15,157.00 RUNPRD RUN IN HOLE WITH 4-1/2", 12.611, 13CR85, VAMTOP PRODUCTION LINER ON 4" DRILL PIPE FROM 4680' MD LINER OVERALL LENGTH TO 10600' MD (JUST INSIDE 7" LINER SHOE) - FILL PIPE EVERY 20 STANDS - MONITOR DISPLACEMENT ON W/ TRIP TANK: 5-10 BPH LOSSES OBSERVED WHILE RUNNING IN HOLE (FINAL VALUE TO BE REPORTED AT END OF RUN) - MUD WEIGHT IN/OUT = 8.6+ PPG - PU = 283 KLBS, SO = 105 KLBS CASING P 15,157.00 RUNPRD CIRCULATE 1.5x DRILL PIPE +LINER VOLUME AT 7" SHOE - STAGE UP PUMPS TO 6 BPM, 745 PSI, NO PIPE MOVEMENT - MUD WEIGHT IN/OUT= 8+6+ PRIG Printed 6(//2018 4:44:17PM *All depths reported in Drillers Depths' Printed 6/72018 4:44:17PM *All depths reported in Drillers Depths' North America - ALASKA - BP Page 2 of 10 Operation Summary Report Common Well Name. 11-23 AFE No Event Type: COM- ONSHORE (CON) Start Date: 5/16/2018 End Date 5/20/201 B X3-018Y4-C: (2,588,604.00 ) Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 12:00:OOAM Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To HIM Task Code NPT Total Depth Phase Desenption of Operations 19:30 - 23:00 3.50 CASING P 15,157.00 RUNPRD RUN IN THE HOLE WITH 4-12", 12.6#, 13CR85, VAMTOP PRODUCTION LINER ON 4" DRILL PIPE IN OPEN HOLE FROM 10600' MD (7" SHOE) TO LINER SETTING DEPTH OF 15155' MD - NO ISSUES RUNNING IN THROUGH OPENHOLE AND NO FILL ON BOTTOM - MONITOR DISPLACEMENT ON W/ TRIP TANK:3 BPH LOSSES OBSERVED WHILE RUNNING IN OPEN HOLE - RUNNING SPEED = 90 FPM - MAKE UP CEMENT HEAD AND TAG BOTTOM AT 15157' MD, PICK UP 2' OFF BOTTOM TO SETTING DEPTH 15155' MD - PU = 216 KLBS, SO = 121 KLBS - TOTAL LOSSES WHILE RUNNING LINER = 25 BBLS 23:00 - 00:00 1.00 CASING P 15,15200 RUNPRD STAGE UP TO CEMENTING RATE IN 1 BPM INCREMENTS SEE NEXT DAYS REPORT FOR DETAILS 5/17/2018 00:00 - 03:00 3.00 CASING P 15,15200 RUNPRD STAGE UPTO CEMENTING RATE IN BPM INCREMENTS -STAGE UP OVER 2 HOURS TO 7 BPM, 1550 PSI -UNABLE TO RECIPROCATE PIPE -CIRCULATING PRESSURES AT 7 BPM APPROACHED 1600 PSI LIMIT - REDUCE RATE AND STAGE BACK UP TOS BPM 1075 PSI ICP, 1025 PSI FCP - CONDITION MUD TO 8.6 PPG, 15 YIELD POINT - CIRCULATE A TOTAL OF 2X BOTTOMS UP SIMOPS: - RIG UP SLB CEMENTERS AND HOLD PJSM FOR CEMENTING Printed 6/72018 4:44:17PM *All depths reported in Drillers Depths' North America - ALASKA - Bld Operation Summary Report Common Well Name. 11-23 Event Type: COM- ONSHORE (CON) Start Date: 5/16/2018 End Date. 5/20/2018 Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud Date/rime: 7/11/1986 12:00:00AM Active datum: 11-238 Actual @74.60usft (above Mean Sea Level Date From - To His Task Code NPT (hr) 0300 - 0600 3.00 CEMT P 0600 - 0800 2.00 0800 - 1200 4.00 CEMT P CEMT P 12:00 - 13:00 1.00 CEMT P 13:00 - 14:30 1.50 PERFOS P Page 3 of 10 AFE No X3 -018Y4 -C'.(2,588,604.00) Rig Release: 5/20/2018 BPUOI: USA00001229 Total Depth Phase Description of Operations (usft) PUMPED BY SLB CEMENTERS 15,157.00 RUNPRD CEMENT4-1/2" PRODUCTION LINERAS FOLLOWS: - FILL LINES AND PRESSURE TEST TO 4500 PSI FOR 5 MINUTES: GOOD TEST - PUMP 30 BBLS OF 12 PPG MUDPUSH II SPACER AT 4 BPM, 500 PSI - PUMP 115 BBLS (600 SKS) OF 15.8 PPG CLASS G TAILAT 5 BPM, 220 PSI, 30% L�l7 CESS VOLUME (YIELD 1.11 CU.FT/SK_ ��JJJ - FLUSH CENT LINES WITH SEAWATER - RELEASE DRILL PIPE WIPER DART Printed 6x7/2018 4:44:17PM *All depths reported in Drillers Depths" PERFORM DISPLACEMENT WITH SEAWATER PUMPED BY SLB CEMENTERS -95 BELS DISPLACED AT BPM: ICP 920 PSI, FCP 1450 PSI - 11 BBLS DISPLACED AT 3 BPM: ICP 550 PSI, FCP 720 PSI - OBSERVE LATCH AT 106.1 BBLS DISPLACED AND SHEAR AT 1690 PSI '- 61 BELS DISPLACED AT 5 BPM: ICP 1490 PSI, FCP 2360 PSI '- REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE OF 1510 PSI - TOTAL DISPLACEMENT VOLUME 177.8 BELS OF 8.5 PPG SEAWATER X40 LOSSES FROM CEMENT EXIT SHOE TO _CEMENT IN PLA E - CEMENT IN PLACE AT 05:48 HRS 15,157.00 RUNPRD SET LINER HANGER AND LINER TOP PACKER PER WEATHERFORD REPRESENTATIVE - INCREASE PRESSURE TO 2500 PSI FOR SET HANGER AFTER PLUG BUMP - BLEED OFF AND CHECK FLOATS: GOOD - SET DOWN 50 KLBS AND CONFIRM HANGER SET - PICK UP AND EXPOSE DOG SUB - SET BACK DOWN ON LINER WITH 50 KLBS AND 15 RPM - PICK UP TO CLEAR PACK -OFF AND CIRCULATE OUT EXCESS CEMENT OFF LINER TOP - PULL RUNNING TOOLABOVE LINER AND MARK NO-GO -CIRCULATE ix BOTTOMS UPAT 16 BPM, DISPLACING WELL FROM 8.6 PPG QUICKDRIL-N TO 8.5 PPG SEAWATER --27 BELS OF EXCESS CEMENT TO SURFACE AT BOTTOMS UP -LAYDOWN NT HEAD 15,157.00 RUNPRD PULLOUT OF THE HOLE WITH LINER RUNNING TOOLON ELEVATORS FROM 10441' MD TO SURFACE - MONITOR WELL FOR 10 MIN: STATIC - PU = 195 KLBS, SO = 125 KLBS AT 10440' MD - LAY DOWN LINER HANGER RUNNING TOOLS 15,157.00 RUNPRD CLEAN AND CLEAR RIG FLOOR 15,157.00 OTHCMP SLIPAND CUT 94' OF DRILL LINE SERVICE TOP DRIVE, BLOCKS, CROWN AND RIG FLOOR EQUIPMENT Printed 6x7/2018 4:44:17PM *All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 4 of 10 Common Well Name: 11-23 AFE No Event Type. COM- ONSHORE (CON) Start Date: 5/16/2018 End Date. 5/20/2018 X3 -018Y4 -C: (2,588,604.00 ) Project: PBU Site. 11 - Rig Name/No.: PARKER 272 Spud DateRme: 7/11/1986 12:00 OOAM Rig Release: 5/20/2018 Rig Contractor PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74 60usft (above Mean Sea Level) Date From - To His Task Code NPT Total Depth Phase Description of Operations (hr) _ _ _ Waft) _ 1430 - 1500 0.50 PERFOB P 15,157.00 OTHCMP RIG UP TO RUN PERFORATING GUNS WITH HALIBURTON TCP SPECIALISTS - MAKE UP XO TO FOSV AND SAFETY JOINT - RIG UP HALLIBURTON TCP RUNNING _ EQUIPMENT ON RIG FLOOR 15:00 - 19:00 4.00 PERFOB P 15,157.00 OTHCMP MAKE UP AND RUN IN THE HOLE WITH HALLIBURTON 2-3/4" JRC VANN GUNS W/ MAXFIRE E -FIRE HEAD TO 3288' MD PER HES RUNNING ORDER - PRE JOB SAFETY MEETING WITH RIG CREW AND HALLIBURTON TCP CREW -MONITOR DISPLACEMENT WITH TRIP TANK - PU = 55 KLBS, SO = 50 KLBS AT 3288' MD 19:00 - 19:30 0.50 PERFOB P 15,157.00 OTHCMP RIG UPTO RUN 2-7/8" PAC DRILL PIPE - RIG UP DOYON CASING TONGS _ 1930 - 2130 2.00 PERFOB P 15,157.00 OTHCMP PICK UP 2-7/8" PAC DRILL PIPEAND RUN IN THE HOLE WITH PERFORATING GUNS ON PAC PIPE FROM 3288' MD TO 4864' MD -MONITOR DISPLACEMENT WITH TRIP TANK - PU = 75 KLBS, SO = 65 KLBS AT 4864' MD 21:30 - 00:00 2.50 PERFOB P 15,157.00 07HCMP RUN IN THE HOLE WITH PERFORATING GUNS ON 4" DRILL PIPE STANDS FROM 4684' MD TO 11000' MD - MONITOR DISPLACEMENT WITH TRIP TANK - PU = 150 KLBS, SO = 105 KLBS AT 11000' MD 5/18/2018 00:00 - 01:30 1.50 ' PERFOB P 15,157.00 OTHCMP PRESSURE TEST 4-1/7PRODUCTION LINER 70 3500 PSI FOR 30 CHARTED _ - LOST < 10 PSI OVER THE ENTIRE TEST - TEST MET BP TEST CRITERIA - SEE ATTACHED TEST CHART 01:30 - 04:00 2.50 PERFOB P 15,157.00 OTHCMP CONTINUE RUNNING IN THE HOLE WITH PERFORATING GUNS ON 4" DRILL PIPE STANDS FROM 11000' MD TO 14852' MD -MONITOR DISPLACEMENT WITH TRIP TANK - SEAWATER: 8.5 PPG IN/OUT - TAG AT 14852' MD WITH 5 KLBS - SET DOWN WITH 15-20 KLBS SEVERAL TIMES AND ATTEMPT TO WORK THOUGH WITHOUT SUCCESS - NOTIFY ODEAND WSUP OF TAG DEPTH '. - PU = 206 KLBS, SO = 115 KLBS AT 14852' MD 04.00 - 09'.30 5.50 PERFOB N 15,157.00 OTHCMP WORK PIPE AND PERFORATING GUNS FROM 14852' MD TOO 15036' MD -VERIFY LINER, DRILL PIPEAND GUN TALLYS - MONITOR DISPLACEMENT WITH TRIP TANK - SEAWATER: 8.5 PPG IN/OUT - WORK STRING WITH 10-20 KLBS THROUGH TIGHT SPOTS PULLING FREE UP EVERY STROKE - TAG AT 15036' MD AND UNABLE TO WORK PIPE BEYOND THIS DEPTH -CONFIRM DEPTHS WITH TALLYS AND PIPE COUNTS - DISCUSS WITH ANCHORAGE TEAM Printed 67/2018 4:44:17PM "All depths reported in Drillers Depths` Common Well Name: 11-23 Event Type: COM- ONSHORE (CON) Protect: PBU North America - ALASKA - Blo Page 5 of 10 Operation Summary Report AFE No End Date: 5/20/2018 X3 -018X4 -C. (2,588,604 00 ) Start Date: 5/16/2018 Site: 11 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To Hire Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 09:30 - 10:30 1.00 PERFOB P 15,157.00 OTHCMP SPACE OUT PERFORATING GUNSAND PERFORATE WELL WITH HALLIBURTON 2-3/4" JRC VANN GUNS W/ MAXFIRE E -FIRE HEAD PER HALLIBURTON PROCEEDURE - PICK UP TO UP WEIGHT, 210 KLBS, AND PULL UP 150' TO SPACE OUT GUNS AT 14880' MD -CLOSE ANNULAR PREVENTER - FOLLOW PRESSURE UP/BLEED OFF SEQUENCE TO FIRE WITH MAXFIRE HEAD - PRESSURE UP DOWN DRILLPIPE AGAINST 'ANNULAR PREVENTER - HELD 120 PSI BACK PRESSURE AND OBSERVED PRESSURE DROP TOO PSI AFTER GUNS FIRED. 2705'NET PERFS ACROSS 7 INTERVALS IN ZONEIASANDS - 11630' MD - 12100' MD (470') - 12200' MD - 12500' MD (300') - 12520' MD - 12680' MD (160') - 12700' MD - 13050' MD (350') P - 13200' MD - 13840' MD (640') 1 - 13970' MD - 14630' MD (660') - 14760' MD - 14885' MD (125') - WELL ON SIGNIFICANT LOSSES AFTER FIRING, ESTIMATED -80-100 BPH INITIAL STATIC LOSS RATE. 2-3/4" JRC VANN GUN DESCRIPTIONS, GUN SWELL 2.915": -6 SPF, 60° DEG PHASING, 2.75" MILLENNIUM 15 GRAM CHARGES, 26" PENETRATION, 0.30" _ ENTRY HOLE DIAMETER 10:30 - 15:00 4.50 PERFOB P 15,157.00 OTHCMP PULL OUT OF THE HOLE ON ELEVATORS WITH 2-3/4" PERFORATING ASSEMBLY ON 4" DRILL PIPE PULL FROM 14880' MD TO SAFETYABOVE 4-1/2" LINER TOP AT 10550' MD - PU = 210 KLBS, SO = 117 KLBS AT 14880' MD - MONITOR WELL FOR 10 MIN AT 10550' MD TO DETERMINE STATIC LOSS RATE: 35 BPH - SEAWATER: 8.5 PPG IN/OUT CONTINUE PULLING OUT OF THE HOLE ON ELEVATORS WITH 2-3/4" PERFORATING ASSEMBLY - FROM 10550' MD TO 4864' MD - MONITOR DISPLACEMENT WHILE PULLING OUT OF THE HOLE: 30 BPH STATIC LOSS RATE SIMOPS: - LAY DOWN 4" DRILL PIPE STANDS OFFLINE WHILE PULLING OUT OF THE HOLE Printed 6/7/2018 4:44:17PM *All depths reported in Drillers Depths' -RIG UP DOYON CASING TONGS AND _ _TORQUE TURN EQUIPMENT 2330 - 0000 0.50 RUNCOM P 15,157.00 RUNCMP MAKE UP WLEG, XN NIPPLE W/ RCH-M, JT W AND HALLIBURTON TNT PACKER TO 99' MD - BAKERLOKALL CONNECTIONS BELOW PACKER - MAINTAIN CONTINOUS HOLE FILL: STATIC LOSS RATE 20 BPH - SEAWATER: 8.5 PPG IN/OUT Printed 6/7/2018 4:44:17PM *All depths reported in Drillers Depths' North America - ALASKA - BP Page 6 of 10 Operation Summary Report Common Well Name. 11-23 APE No Event Type: COM- ONSHORE (CON) Start Date: 5/16/2018 End Date. 5/20/2018 X3 -018Y4 -C'. (2,588,604.00 ) Project: PBU Site: 11 Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 12:00 OOAM Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @374.60usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) 15:00 -__17:30 2.50 PERFOB P 15,157.00 OTHCMP PULLOUT OF THE HOLE WITH 3-3/4" PERFORATING ASSEMLY, LAYING DOWN 2-7/8" PAC DRILL PIPE - FROM 4864' MD TO TOP OF GUNS AT 3280' MD - MONITOR DISPLACEMENT WHILE PULLING OUT OF THE HOLE: 20 BPH STATIC LOSS RATE - SEAWATER: 8.5 PPG IN/OUT 17:30 - 21:00 3.50 PERFOB P 15,157.00 OTHCMP PULLAND LAY DOWN 2-3/4" PERFORATING GUNS PER HALLIBURTON TCP PROCEDURE FROM 3280' MD I -MONITOR DISPLACEMENT WHILE PULLING OUT OF THE HOLE: 20 BPH STATIC LOSS RATE - SEAWATER: 8.5 PPG IN/OUT -ALL GUNS FIRED 21:00 - 2300 2.00 PERFOB P 15,157.00 OTHCMP RIG DOWN PERFORATING GUN HANDLING EQUIPMENTAND CLEAN AND CLEAR RIG FLOOR - PULL WEAR BUSHING - FLUSH BOP STACK -MAINTAIN CONTINOUS HOLE FILL: STATIC LOSS RATE 20 BPH -SEAWATER: 8.5 PPG IN/OUT 23:00 - 23:30 0.50 RUNCOM P 15,157.00 RUNCMP RIG UP TO RUN 4-112",12.6# VAMTOP COMPLETION PER APPROVED TUBING TALLY - - VERIFY PIPE COUNTAND JEWELRY LAYOUT IN PIPE SHED -RIG UP DOYON CASING TONGS AND _ _TORQUE TURN EQUIPMENT 2330 - 0000 0.50 RUNCOM P 15,157.00 RUNCMP MAKE UP WLEG, XN NIPPLE W/ RCH-M, JT W AND HALLIBURTON TNT PACKER TO 99' MD - BAKERLOKALL CONNECTIONS BELOW PACKER - MAINTAIN CONTINOUS HOLE FILL: STATIC LOSS RATE 20 BPH - SEAWATER: 8.5 PPG IN/OUT Printed 6/7/2018 4:44:17PM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name. 11-23 Event Type: COM -ONSHORE (CON) Phase Description of Operations Start Date'. 5/16/2018 Project: PBU 15,157.00 Site: 11 Rig Name/No.: PARKER 272 COMPLETION TUBING FROM 99' MD TO 10446' Spud DateRme: 7/11/1986 Rig Contractor. PARKER DRILLING CO. - BAKERLOKALL CONNECTIONS BELOWTHE Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To Hm Task Code NPT VAMTOP THREADS (hr) - TORUE TURN VAMTOP CONNECTIONS TO 5/19/2018 0000 - 1400 14.00 RUNCOM P 1400 - 1600 2.00 RUNCOM P Page 7 of 10 AFE No End Date 5/2012018 X3 -018Y4 -C (2,588,604.00) Rig Release: 520/2018 Total Depth Phase Description of Operations (usft)__ 15,157.00 RUNCMP RUN 4-1/2", 12.6111, 13CR, VAMTOP COMPLETION TUBING FROM 99' MD TO 10446' MD. SPACE OUTAND LAND TUBING HANGER - BAKERLOKALL CONNECTIONS BELOWTHE PACKER - APPLY BEST -O -LIFE 4010 TO PREMIUM VAMTOP THREADS - TORUE TURN VAMTOP CONNECTIONS TO OPT MU TRO OF 4440 FT -LBS. VAM REP ON LOCATION TO INSPECT THREADS AND WITNESS MAKEUP - RUNNING SPEED = 90 FPM, AVERAGE 22 JOINTS PER HOUR - FINAL PICKUP/SLACKOFF WEIGHTS = 157/105 KLBS (P272 TOP DRIVE+ BLOCKS = 35 KLBS) - SEE ATTACHED EXCEL TALLY - SEAWATER: 8.5 PPG IN/OUT (CONTINUOUS CIRCULATION OVER TOP): - 10-15 BPH LOSS RATE WHILE RUNNING IN THE HOLE - TOTAL LOSSES WHILE RUNNING IN THE 'HOLE: 134 BBLS :- CAMERON REP TORQUE GLAND NUTS TO ' 500 FT -LBS + LOCKDOWN SCREWS TO 450 FT -LBS SPACEOUT NOTES: - TAG BASE OF LINER PBR AT 3.5' IN ON JOINT #244 - LAYDOWN JOINTS 244, 243, 242, AND 241 - PICKUP SPACEOUT PUPS 19.94', 9.89' AND 3.83', JOINT 241 AND HANGER. - RUN IN HOLE AND LAND HANGER WITH WLEG AT 10446' MD (5' INTO LINER TOP PBR, 6' OFF LINER TOP NO-GO) SIMOPS: -LAYDOWN 4" DRILLPIPE WITH OFFLINE EQUIPMENT 15,157.00 RUNCMP REVERSE IN COMPLETION FLUIDS -4 BPM, 450 PSI - PUMP 235 BBLS CORROSION INHIBITED SEAWATER - CHASE WITH 175 BBLS CLEAN SEAWATER - PUMP 5 BBLS THE LONG WAY TO FLUSH RHC -M PLUG SIMOPS: -RIG DOWN 4-12" COMPLETION RUNNING TOOLS Printed 6x7/2018 4:44:17PM *All depths reported in Drillers Depths' 3500 PSI 4-1 /2" TUBING TEST: -PRESSURE CROSSCHECK COMPLETED - TEST WITH 8.5 PPG SEAWATER, 60-F - PRODUCTION PACKER SET DURING PRESSURE UP - STARTING PRESSURE = 3790 PSI - PRESSUREAFTER 15 MIN = 3790 PSI - PRESSURE AT 30 MIN = 3790 PSI - BBLS TO PRESSURE UP = 2.5 BBLS - BBLS BLED BACK = 2.5 BBLS - DS11 AMBIENT TEMP = 25°F - ESTIMATED BOTTOM HOLE TEMP = 176 °F 3500 PSI INNER ANNULUS AND PRODUCTION PACKER TEST: - PRESSURE CROSSCHECK COMPLETED - TEST WITH 8.5 PPG SEAWATER, 60OF - 2000 PSI HELD ON TUBING DURING TEST (TO PREVENT SHEAR OF UPPER GLM) - STARTING PRESSURE = 3775 PSI - PRESSURE AFTER 15 MIN = 3775 PSI - PRESSURE AT 30 MIN = 3775 PSI - BBLS TO PRESSURE UP = 5.5 BBLS - BBLS BLED BACK= 5.5 BBLS - DS11 AMBIENT TEMP = 25°F -ESTIMATED BOTTOM HOLE TEMP =176°F PRESSURE TESTS APPROVED BY WSUP SEE ATTACHED TEST CHARTAND TEST CRITERIA CALCULATORS PRESSURE UP ON TUBING TO 3500 PSI AND BLEED OFF QUICKLY TO SHEAR DCK VALVE IN UPPER GLM VERIFY CIRCULATION BOTH WAYS AT 2 BPM: 85/560 PSI 19:00 - 22:00 3.00 RUNCOM P 15,157.00 RUNCMP FREEZE PROTECT TUBING AND IA WITH 90°F 6.8 PPG DIESEL TO 2200' MD/TVD -REVERSE 151 BBLS INTO IA WITH FREEZE PROTECT PUMP; 2.5 BPM, 700 PSI - U -TUBE DIESEL FROM IATO TUBING FOR ONE HOUR. CONFIRM NO FLOW, NO PRESSURE AT END OF U -TUBE - TOTAL DIESEL IN TUBING = 34 BBLS, TOTAL IN IA= 117 BBLS SIMOPS: - RIG DOWN RIG FLOOR EQUIPMENT - BLOW DOWN TOP DRIVE - CHANGE SAVER SUB TO NC50 FOR NEXT WELL - RIG DOWN MUD LINES Printed 6/7/2018 4:44:17PM •AII depths reported in Drillers Depths' North America - ALASKA - BP Page 8 or 10 Operation Summary Report Common Well Name: 11-23 AFE No Event Type'. COM- ONSHORE(CON) Start Date. 5/16/2018 End Date: 5/202018 X3-01BY4-C:(2,588.604.00) Project: PBU Site: 11 ' Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 12:00:00AM Rig Release: 5/20/2016 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ _ (usft) 1600 - 1900 3.00 RUNCOM P 15,157.00 RUNCMP DROP BALLAND RODANDALLOW TO LAND ON SEAT ON RHC -M PLUG. PRESSURE UP AND SET HALLIBURTON'TNT' PRODUCTION PACKER PER HALLIBURTON REPRESENTATIVE AND PRESSURE TEST TUBING AND IA TO 3500 PSI FOR 30 CHARTED MIN EACH. BOTH TESTS PASS PER BP Z1 I LKIA am 3500 PSI 4-1 /2" TUBING TEST: -PRESSURE CROSSCHECK COMPLETED - TEST WITH 8.5 PPG SEAWATER, 60-F - PRODUCTION PACKER SET DURING PRESSURE UP - STARTING PRESSURE = 3790 PSI - PRESSUREAFTER 15 MIN = 3790 PSI - PRESSURE AT 30 MIN = 3790 PSI - BBLS TO PRESSURE UP = 2.5 BBLS - BBLS BLED BACK = 2.5 BBLS - DS11 AMBIENT TEMP = 25°F - ESTIMATED BOTTOM HOLE TEMP = 176 °F 3500 PSI INNER ANNULUS AND PRODUCTION PACKER TEST: - PRESSURE CROSSCHECK COMPLETED - TEST WITH 8.5 PPG SEAWATER, 60OF - 2000 PSI HELD ON TUBING DURING TEST (TO PREVENT SHEAR OF UPPER GLM) - STARTING PRESSURE = 3775 PSI - PRESSURE AFTER 15 MIN = 3775 PSI - PRESSURE AT 30 MIN = 3775 PSI - BBLS TO PRESSURE UP = 5.5 BBLS - BBLS BLED BACK= 5.5 BBLS - DS11 AMBIENT TEMP = 25°F -ESTIMATED BOTTOM HOLE TEMP =176°F PRESSURE TESTS APPROVED BY WSUP SEE ATTACHED TEST CHARTAND TEST CRITERIA CALCULATORS PRESSURE UP ON TUBING TO 3500 PSI AND BLEED OFF QUICKLY TO SHEAR DCK VALVE IN UPPER GLM VERIFY CIRCULATION BOTH WAYS AT 2 BPM: 85/560 PSI 19:00 - 22:00 3.00 RUNCOM P 15,157.00 RUNCMP FREEZE PROTECT TUBING AND IA WITH 90°F 6.8 PPG DIESEL TO 2200' MD/TVD -REVERSE 151 BBLS INTO IA WITH FREEZE PROTECT PUMP; 2.5 BPM, 700 PSI - U -TUBE DIESEL FROM IATO TUBING FOR ONE HOUR. CONFIRM NO FLOW, NO PRESSURE AT END OF U -TUBE - TOTAL DIESEL IN TUBING = 34 BBLS, TOTAL IN IA= 117 BBLS SIMOPS: - RIG DOWN RIG FLOOR EQUIPMENT - BLOW DOWN TOP DRIVE - CHANGE SAVER SUB TO NC50 FOR NEXT WELL - RIG DOWN MUD LINES Printed 6/7/2018 4:44:17PM •AII depths reported in Drillers Depths' Common Well Name. 11-23 Event Type: COM- ONSHORE (CON) Project: PBU NorthAmerica- ALASKA - BP Operation Summary Report Start Date. 5/16/2018 End Date: 520/2018 Site: 11 Active datum. 11-238 Actual @74.60usft (above Mean Sea Level) Page 9 of 10 AFE No K3 -018Y4 -C'. (2,588.60400) Rig Release: 5/20/2018 BPUOI: USA00001229 Date From - To Ars Task Code NPT Total Depth Phase Description of Operations (Ing (usft) 22:00 23:00 1.00 WHSUR P 15,157.00 RUNCMP CAMERON REPRESENTATIVE SET 4"CIW TYPE H TWC IN TUBING HANGER WITH DRY ROD. - PRESSURE TEST TWC FROM BELOW WITH DIESEL TO 3500 PSI FOR 5 CHARTED MIN: . GOOD TEST - SEE ATTACHED TEST CHART 23:00 - 00:00 1.00 RIGID P 15,157.00'i RUNCMP BLOW DOWN AND RIG DOWN ALL SURFACE LINES AND EQUIPMENT. _ CLEAN FLOW B_OXAND DRIP PANS. 520/2018 00:00 - 03:30 3.50 BOPSUR P 15,157.00 RUNCMP NIPPLE DOWN BOPEAND HIGH PRESSURE RISERS - LAY DOWN RISERS TO PIPE SHED AND SET SOP STACK BACK ON STUMP IN BOP DECK SIMOPS: -GENERAL RIG DOWN AROUND THE RIG 03:30 - 05:30 2.00 WHSUR P 15,157.00 RUNCMP NIPPLE UP 11"X4" TUBING HEADADAPTER AND DOUBLE MASTER 4" DRY HOLE TREE SIMOPS: - CHANGE UPPER RAMS FROM 2-7/8" x 5" TO - 4-1/2"x 7" VBRS FOR NEXT WELL GENERAL RIG DOWN OPERATIONS 05:30 - 11:30 6.00 WHSUR P 15,15200 RUNCMP PRESSURE TEST ADAPTER AND TREE - CAMERON REPRESENTATIVE TEST TUBING HEAD ADAPTER (TUBING PACK -OFF) TO 4500 PSI FOR 15 MIN. TEST APPROVED BY WSUP. SEE ATTACHED CHART. - 5 HOURS TO TEST VOID DUE TO THERMAL EFFECTS, LONG STABILIZATION PERIOD, INCREASING PRESSURE TRENDS, SUSPECTEDAIR IN LINES, NIPPLE DOWN/UP OF TREE TO CONFIRM NO SEAL LEAKAGE, ETC. - RIG TEST DRYHOLE TREE AGAINST TWC WITH DIESEL TO 4500 PSI FOR 5 MIN (LEAKTIGHT CRITERIA PASS). EVACUATE TREE FLUIDS AND POUR TWO BOTTLES OF HEAT INTO TREE TO PREVENT FREEZING. SIMOPS: GENERAL RIG DOWN OPERATIONS THROUGHOUT RIG - RIG DOWN RIG FLOOR, MUD MODULE AND PIPE SHED - PREPARE TO SKID RIG FLOOR -SECURE TOP DRIVEAND BRIDLE UP 4:44:17PM *All depths reported in Drillers Depths' North America - ALASKA- BP Operation Summary Report Page 10 of 10 Common Well Name: 11-23 AFE No Event Type: COM- ONSHORE (CON) Start Date: 5/16/2018 End Date: 5/20/2018 X3 -018Y4 -C: (2,588,604.00 ) Proleec[ PBU Site: 11 Rig Name/No.: PARKER 272 Spud Date/Time: 7/11/1986 12:00,00AM Rig Release: 5/20/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00001229 Active datum: 11-23B Actual @74.60usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Descnpbon of Operations (hr). (usft) _ .11:30 - 12:00 0.50 WHSUR P 15,157.00 RUNCMP CLEAN CELLAR AND SECURE WELL - INSTALL ANNULUS AND TREE EQUIPMENT, FINAL T/I/O = 0/0/0 PSI -CLOSEALLVALVES ON TREEAND 'WELLHEAD TO PRESSURE GAUGES - LEAVE WELL HANDOVER CERTIFICATE OPEN FOR POST RIG WELLS GROUP WORK HANDOVER WELL FOLDER TO WELL INTEGRITY. - CLEANUP LOCATION - PULL DUMMY WELLHOUSE WITH LOADER SIMOPS: GENERAL RIG DOWN OPERATIONS THROUGHOUT THE RIG END CON EVENTAND RELEASE PARKER RIG 272 AT 12:00 PERFORMANCE SUMMARY: - NO HSE INCIDENTS '- 26.5 DAYS, 5 DAYS BEHIND 21.5 DAY TARGET, 0.9 DAYS BEHIND 25.6 DAYAFE --$8.75MM,$1.325MM BEHIND$7.425MM TARGET. $75K BEHIND $8.675MM AFE 25%,159 HOURS, 6.6 DAYS OF TOTAL NPT (WELUPAD PREP DELAYS, EXTRA RUN FOR EZSV, DROPPED WHIPSTOCK, UNPLANNED PROD HOLE SIDETRACK) Printed 6!//2018 4:44:17PM 'All depths reported in Drillers Depths` 0 by North America - ALASKA - BP PBU 11 11-23 11-23BPB1 50029216070 Design: 11-23BPB1 Final Survey Report 17 May, 2018 BA ER F UGHES a GE company BP BAKER by Final Survey Report JUGHES E.m,,, Company: North America - ALASKA - BP Project: PBU Site: 11 Well: 11-23 Wellbore: 11-23B Design: 11-23B Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 11-23 11-23B Actual @ 74.60usft (P272 Actual) 11-23B Actual @ 74.60usft (P272 Actual) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor Site 11, TR -11-15 (nT) Site Position: BGGM2017 5/1/2018 Northing: 5,949,527.780 usft Latitude: From: Map Easting: 707,585.650 usft Longitude: Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: Welt 11-23 ACTUAL Tie On Depth: 11,281.92 Well Position -N/-S 0.00 usft Northing: 5,952,810.850 usft Latitude: +E/ -W 0.00 usft Easting: 707155.970 usft Longitude: Position Uncertainty 0.00 usft Wellhead Elevation: 28.45 usft Ground Level: Wellbore 11-23B Magnetics Model Name Sample Date Declination Dip Angle Field Strength 70° 15'55.850 N 148° 19' 17,134 W 1.58 ° 701 16'28.245 N 148° 19' 27.005 W 27.90 usft (nT) BGGM2017 5/1/2018 1746 8098 57,473 Design 11-23B Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 11,281.92 Vertical Section: Depth From (TVD) .NI -S -E/.W Direction (usft) (usft) (usft) (1) 46 15 0.00 000 337 63 51172018 3:54:26PM Page 2 COMPASS 5000.1 Build 81D b BP BAER p Final Survey Report F�gll E Company: North America - ALASKA - BP Project: PBU Site: 11 Well: 11-23 Wellbore: 11-23B Design: 11-238 Survey Program From (usft) 11760 598.60 6,443.00 11,287.00 Survey MD (usft) 46.15 117.60 126.60 20" 217.60 317.60 417.60 598.60 719.60 810.60 902.60 961.60 1,142.60 1,263.60 1,357.60 1,452.60 1,546.60 1,641 60 1,73480 1,829,60 Date 5/17/2018 162.20 To (usft) Survey (Wellbore) Tool Name 598.60 Sperry Boss Gyro MS WRP 57.0' Copy (11 BOSS -GYRO 6,11460 MWD (11-23) MWD 11,281.92 BHGE OTK MWD IIFR_MSA 81/2" (11-23 MWD+IFR+MS-WOCA 15,121.75 BHGE OTK MWD IIFR_MSA 6-1/8"(11-2 MWD+IFR+MS-WOCA Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Description Sperry -Sun BOSS gyro multishot MWD - Standard MWD + IFR + Multi Station W/O Crustal MWD + IFR + Multi Station W/O Crustal Well 11-23 11-23B Actual @ 74.60usft (P272 Actual) 11-23B Actual @ 74.60usft (P272 Actual) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Inc Azi (uimuth) TVD TVDSS HIS PJW Northing Easting DLeg V. Sec (usft) (usft) (usft) (usft) (usft) (usft) ('1100usft) (usft) 0.00 0.00 46.15 -28.45 0.00 0.00 5,952,810.850 707,155.970 0.00 0.00 1.10 162.50 117.60 43.00 -0.65 0.21 5,952,810.202 707,156.194 1.54 -0.68 1.08 162.48 126.59 51.99 -0.82 0.26 5,952,810.040 707,158.250 0.20 -0.85 0.90 162.20 217.58 142.98 -2.32 0.73 5,952,808.554 707,158.768 0.20 -242 0.90 163.70 317.57 242.97 -3.82 1.20 5,952 807 066 707,157.270 0.02 -3.99 1.10 172.00 417.55 342.95 -5.52 1.55 5,952,805.372 707,157.871 0.25 -5.70 3.80 285.80 598.42 523.82 -5.61 -3.98 5,952,805.132 707,152.144 2.41 -367 8.30 290.80 718.72 644.12 -142 -16.01 5,952,808.994 707,140.005 3.74 4.78 10.80 290.10 808.45 733.85 3.85 -30.16 5,952,813.866 707,125.717 2.75 15.04 11.10 296.40 898.78 824.18 10.75 -46.19 5,952,820.322 707,109.506 1.34 27.52 10.50 298.10 956.74 882.14 15.81 .56.02 5,952,825.107 707,099.542 1.15 35.94 10.30 314,00 1,134.80 1,060.20 34.82 -82.21 5,952,843.390 707,072.836 1.58 63.49 14.40 328.70 1,253.00 1,178.40 55.20 -97.82 5,952,863.336 707,056.673 4.24 88.28 16.70 342.80 1,343.59 1,268.99 78.10 -107.89 5,952,885.949 707,045.976 4.69 113.29 20.00 342.10 1,433.74 1,359.14 106.61 -116,92 5,952,914.195 707,036.163 3.48 143.09 22.60 342.10 1,521.32 1,446.72 139.10 -127.42 5,952,946.382 707,024.779 2.77 177.12 26.50 342.40 1,607.71 1,533.11 176.69 -139.44 5,952,983.622 707,011.725 4.11 216.46 29.30 343.80 1,689.89 1,615.29 218.33 -152.07 5,953,024.895 706,997.959 3.09 259.77 32.30 344.50 1,771.49 1,696.89 265.12 -165.34 5,953,071.302 706,983.406 3.18 308.09 5/172018 3:54:26PM Page 3 COMPASS 5000.1 Build 81D by Final SBP y Report BAKER E�pa°y Company: North America -ALASKA - BP Local Coordinate Reference: Well 11-23 Project: PBU TVD Reference: 11-238 Actual @ 74.60usft (P272 Actual) Site: 11 MD Reference: 11-23B Actual @ 74.60usft (P272 Actual) Well: 1143 North Reference: True Wellbore: 11-23B Survey Calculation Method: Minimum Curvature Design: 11-23B Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easgng DLeg V. Sec (usft) (I (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 1,922.60 34.80 343.10 1,848.99 1,774.39 314.46 -179.69 5,953,120.230 706,967.696 2.81 359.19 1,984.60 36.70 340.30 1,899.31 1,824.71 348.84 -191.08 5,953,154.277 706,955.365 4.04 395.31 2,182.60 34.60 342.10 2,060.20 1,985.60 458.05 -228.31 5,953,262.418 706,915.146 1.19 510.47 2,276.60 36.50 343.80 2,136.67 2,062.07 510.30 -244.32 5,953,314.204 706,897.710 2.28 564.88 2,465.60 38.80 353.70 2,286.44 2,211.84 523.25 -266.52 5,953,426.499 706,872.407 3.42 677.79 ail 2,557.60 42.80 355.80 2,356.08 2,281.48 683.10 -271.98 5,953,486.171 706,865.307 4.60 735.21 2,652.60 46.10 356.50 2,423.88 2,349.28 749.47 -276.43 5,953,552.387 706,859.027 3.51 798.27 2,748.60 4640 357.60 2,490.27 2,415.67 818.72 -280.00 5,953,621.512 706,853.555 0.88 863.67 2,753.60 46.41 357.50 2,493.72 2,419.12 822.34 -280.15 5,953,625.124 706,853.301 1.47 867.06 13 3/8" 3,118.60 47.10 350.20 2,743.97 2,669.37 1,086.32 -308.70 5,953,888.205 706,817.502 1.47 1,122.05 3,554.60 50.20 348.10 3,032.00 2,95740 1,407.67 -370.43 5,954,207.716 706,746.946 0.80 1,442.72 3,803.60 51.90 ._ 344.50 _.,3,188.56 3,113.96 1,595.73 -416.35 5,954,394428 706,695.870 1.32 1,634.10 3,927.60 50.10 340.70 3,266.61 3,192.01 1,687.86 -445.12 5,954,485531 706,664.584 2.79 1,730.06 4,116.60 51.90 341.70 3,385.55 3,310.95 1,826.70 192.43 5,954,623210 706,613.460 1.04 1,876.65 4,33680 50.00 -- 337.50 --- -3,524.18 3,449.58 1,986.80 -551.88 5,954,781.598 706,549.630 1.72 2,04232 , 4,525.60 49.00 337.90 3,646.92 3,572.32 2,119.76 -606.42 5,954,913.004 706,491.457 0.55 2,191.03 4,928.60 45.80 340.30 3,919.69 3,845.09 2,396.76 -712.37 5,955,186.965 706,377.931 0.91 2,487.51 5,242.60 45.10 340.00 4,139.97 4,065.37 2,607.23 -788.34 5,955,395.256 706,296.191 0.23 2,711.06 5,554.60 48.10 338.90 4,354.32 4,279.72 2,819.45 -867.96 5,955,605.189 706,210.770 1.00 2,937.60 5,867.60 50.80 337.90 4,557.79 4,483.19 3,040.53 -955.54 5,955,823.770 706,117.142 0.90 3,175.38 6,114.60 53.50 336.80 4,709.34 4,634.74 3,220.49 -1,030.67 5,956,001.584 706,037.089 1.15 3,370.39 6443.00 54.73 335.19 4,901.84 4,827.24 3,463.52 -1,138.93 5,956,241.525 705,922.186 0.55 3,636.33 9 5/8" Surface Casing 6,473.36 51.18 333.90 4,920.12 4,845.52 3,485.40 -1,149.33 5,956,263.107 705,911.181 12.17 3,660.53 6,563.51 46.84 332.90 4,979.24 4,904.64 3,546.23 -1,179.78 5,956,323.081 705,879.076 4.89 3,728.37 6,628.49 45.69 330.10 5,024.17 4,949.57 3,587.49 -1,202.17 5,956,363.704 705,855.561 3.58 3,775.05 5/17/2018 3:54:26PM Page 4 COMPASS 5000.1 Build 81D BP BAKER by Final Survey Report gUGHES timmpany Company: North America - ALASKA - BP Local Coordinate Reference: Well 11-23 Project: PBU TVD Reference: 11-238 Actual @ 74.60usft (P272 Actual) Site: 11 MD Reference: 11-23B Actual @ 74.60usft (P272 Actual) Well: 11-23 North Reference: True Wellbore: 11-23B Survey Calculation Method: Minimum Curvature Design: 11-23B Database: EDM RSK - Alaska PROD - ANCPi Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) 0 (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 6,659.08 45.05 329.63 5,045.66 4,971.06 3,606.32 -1,213.10 5,956,382.223 705,844.119 2.36 3,796.62 6,689.13 44.35 328.34 5,067.02 4,992.42 3,624.43 -1,223.98 5,956,400.030 705,832.735 3.81 3,817.51 6,722.51 44.11 328.95 5,090.94 5,016.34 3,644.32 -1,236.10 5,956,419.571 705,820.077 1.46 3,840.51 6,753.02 44.06 328.58 5,112.85 5,038.25 3,662.47 -1,247.11 5,956,437.410 705,808.576 0.86 3,861 AS 6,849.82 42.78 327.11 5,183.16 5,108.56 3,718.80 -1,282.51 5,956,492.741 705,771.641 1.68 3,927.05. 6,944.21 40.30 326.77 5,253.81 5,179.21 3,771.26 -1,316.65 5,956,544.237 705,736.072 2.64 3,988.55' 7,038.19 38.12 325.68 5,326.62 5,252.02 3,820.64 -1,349.66 5,956,592.694 705,701.712 2.43 4,046.78 7,133.44 36.08 325.80 5,402.59 5,327.99 3,868.13 -1,382.00 5,956,639.266 705,668.075 2.14 4,103.00 7,228.94 34.94 325.68 5,480.33 5405.73 3,913.97 -1,413.23 5,956,684.233 705,635.600 1.20 4,157.28 7,323.37 34.79 324.80 5,557.81 5,483.21 3,958.32 -1,444.01 5,956,727.713 705,603.618 0.56 4,210.01 7,419.47 34.02 324.90 5,637.09 5,562.49 4,002.72 -1,475.27 5,956,771.231 705,571.147 0.80 4,262.96 7,514.17 33.98 324.26 5,715,60 5,641.00 4,045.87 -1,505.96 5,956,813.522 705,539.281 0.38 4,314.55 7,608.84 34.02 324.48 5,794.09 5,719.49 4,088.90 -1,536.80 5,956,855.683 705507.271 0.14 4,366.07 7,703.70 33.94 32344 5,872.75 5,798.15 4,131.77 -1,567.99 5,956,897.675 705,474.913 0.62 4,417.59 7,799.09 34.02 321.82 5,951.85 5,877.25 4,174.13 -1,600.35 5,956,939.133 705,441.403 0.95 4,469.08 7,893.46 33.98 320.14 6,030.09 5,955.49 4,215.13 -1,633.57 5,956,979.196 705,407.068 1.00 4,519.64 7,988.58 34.02 319.90 6,108.95 6,034.35 4,255.89 -1,667.74 5,957,018.996 705,371.784 0.15 4,570.33 8,083.25 33.37 319.37 6,187.72 6,113.12 4,295.91 -1,701.76 5,957,058.060 705,336.684 0.75 4,620.28 8,177.74 33.37 318.79 6,266.63 6,192.03 4,335.18 -1,735.80 5,957,096.378 705,301.575 0.34 4,669.56 8,272.50 33.26 318.92 6,345.81 6,271.21 4,374.37 -1,770.04 5,957,134.612 705,266.266 0.14 4,718.83 8,367.58 33.24 320.82 6,425.33 6,350.73 4,414.23 -1,803.64 5,957,173.524 705,231.587 1.10 4,768.48 8,462.45 33.21 321.98 6,504.69 6,430.09 4,454.85 -1,836.07 5,957,213.237 705,198.053 0.67 4,818.38 8,558.11 33.31 321.84 6,584.68 6,510.08 4,496.14 -1,868.43 5,957,253.620 705,164.566 0.13 4,868.89 8,652.23 33.25 320.95 6,663.37 6,588.77 4,536.50 -1,900.66 5,957,293.075 705,131.245 0.52 4,918.47 8,748.19 33.25 321.16 6,743.62 6,669.02 4,577.42 -1,933.73 5,957,333.067 705,097.061 0.12 4,968.90 8,842.79 33.19 321.65 6,822.76 6,748.16 4,617.93 -1,966.06 5,957,372.666 705,063.629 0.29 5,018.66 8,938.17 33.10 322.84 6,902.62 6,828.02 4,659.18 -1,997.95 5,957,413.027 705,030.614 0.75 5,068.95 5/172018 3: 54 26P Page 5 COMPASS 5000.1 Build 81D •a Company: North America -ALASKA -8P Project: PBU Site: 11 Well: 11-23 Wellbore: 11-23B Design: 11-23B Survey MD Inc (usft) ( ) 9,033.11 9,128.44 9,223.38 9,318.09 9,413.02 9,508.00 9,602.91 9,697.62 9,794.09 9,888.54 9,983.23 10,078.63 10,172.22 10,268.24 10,362.71 10,458.32 10,552.49 10,584.44 10,615.00 DRILLING LINER 1 10,652.84 10,683.66 10,715.03 10,746.91 10,777.57 10,810.08 10,841.35 BP Final Survey Report �F�VGH GEmmpany Local Co-ordinate Reference: Well 11-23 TVD Reference: 11-23B Actual @ 74.60usft (P272 Actual) MD Reference: 11-23B Actual Q 74.60usft (P272 Actual) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 32.12 Azi (azimuth) TVD TVDSS NIS E1W 5,958,144.925 Northing Easgng DLeg V. sec 33.32 330.20 (°) (usft) (usft) (usft) (usft) (usft) (usft) 3.91 (1100usit) (usft) 329.38 33.28 322.10 6,982.07 6,907.47 4,700.43 -2,029.58 704,449.160 5,957,453.380 704,997.868 6,000.57 0.52 5,119.13 8,423.57 33.33 322.05 7,061.74 6,987.14 4,741.72 -2,061.75 5,957,493.768 704,964.572 39.31 0.06 5,169.55 8,373.04 33.38 322.17 7,141.05 7,066.45 4,782.91 -2,093.81 7.52 5,957,534.064 704,931.393 327.05 0.09 5,219.85 5,485.96 33.25 322.37 7,220.19 7,145.59 4,824.05 -2,125.64 6,058.60 5,957,574.311 704,898.442 8,495.53 0.18 5,270.01 -2,601.07 33.40 321.00 7,299.51 7,224.91 4,864.97 -2,157.97 5,957,614.321 704,664.996 0.81 5,320.16 33.14 320.43 7,378.93 7,304.33 4,905.30 -2,190.97 5,957,653.725 704,830.909 0.43 5,370.01 33.29 320.08 7,458.33 7,383.73 4,945.27 -2,224.21 5,957,692.767 704,796.582 0.26 5,419.62 33.31 320.53 7,537.49 7,462.89 4,985.28 -2,257.42 5,957,731.845 704,762.284 0.26 5,469.26 33.32 321.68 7,618.11 7,543.51 5,026.52 -2,290.69 5,957,772.148 704,727.895 0.65 5,520.06 32.46 323.59 7,697.42 7,622.82 5,067.27 -2,321.82 5,957,812.027 704,695.656 1.43 5,569.59 32.79 324.85 7,777.17 7,702.57 5,108.64 -2,351.73 5,957,852.549 704,664.612 0.70 5,619.23 33.23 324.56 7,857.17 7,782.57 5,151.00 -2,381.84 5,957,894.069 704,633.356 0.46 5,669.86 33.30 324.29 7,935.42 7,660.82 5,192.76 -2,411.70 5,957,934.982 704,602.354 0.18 5,719.84 32.22 326.89 8,016.17 7,941.57 5,235.61 -2,441.07 5,957,977.002 704,571.817 1.85 5,770.64 30.50 329.75 8,096.84 8,022.24 5,277.42 -2,466.91 5,958,018.083 704,544.840 2.41 5,819.14 30.74 329.96 8,179.12 8,104.52 5,319.53 -2,491.37 5,958,059.504 704,519.236 0.27 5,867.39 30.64 330.46 8,260.10 8,185.50 5,361.24 -2,515.24 5,958,100.540 704,494.218 0.29 5,915.05 30.77 330.24 8,287.57 8,212.97 5,375.42 -2,523.32 5,958,114.490 704,485.761 0.54 5,931.23 31.37 330.13 8,313.75 8,239.15 5,389.10 -2,531.16 5,958,127.953 704,477.546 1.98 5,946.87 32.12 330.00 8,345.93 8,271.33 5,406.36 -2,541.09 5,958,144.925 704,467.139 1.98 5,966.61 33.32 330.20 8,371.86 8,297.26 5,420.80 -2,549.40 5,958,159.132 704,458.441 3.91 5,983.12 35.01 329.38 8,397.81 8,323.21 5,436.02 -2,558.26 5,958,174.103 704,449.160 5.58 6,000.57 37.20 328.81 8,423.57 8,348.97 5,452.14 -2,567.91 5,958,189.947 704,439.071 6.95 6,019.15 39.31 327.31 8,447.64 8,373.04 5,468.24 -2,577.96 5,958,205.766 704,428.585 7.52 6,037.87 41.55 327.05 8,472.39 8,397.79 5,485.96 -2,589.39 5,958,223.162 704,416.675 6.91 6,058.60 42.99 325.49 8,495.53 8,420.93 5,50344 -2,601.07 5,958,240.322 704,404.517 5.70 6,079.22 5/17/2018 3:54:26PM Page 6 COMPASS 5000.1 Build 810 BP by Final Survey Report �F�UGHES �r P v Company: North America - ALASKA - BP Local Coordinate Reference: Well 11-23 Project: PBU TVD Reference: 11-23BActual @ 74.60usft (P272 Actual) Site: 11 MD Reference: 11-23BActual Q 74.60usK (P272 Actual) Well: 11-23 North Reference: True Wellbore: 11-23B Survey Calculation Method: Minimum Curvature Design: 11-23B Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS FEW Northing Easting DLeg V. Sec (usR) (°( (°) (usft) (waft) (usft) (usft) (usft) (usR) (°/100usft) (usf) 10,871.84 44.76 324.92 8,517.51 8,442.91 5,520.80 -2,613.13 5,958,257.334 704,391.985 5.95 6,099.85 10,904.47 47.43 324.44 8,540.13 8,465.53 5,539.98 -2,626.72 5,958,276.131 704,377.870 8.25 6,122.76 10,936.44 49.91 324.41 8,561.24 8,486.64 5,559.50 -2,640.69 5,958,295.262 704,363.373 7.76 6,146.13 10,966.97 51.66 324.24 8,580.54 8,505.94 5,578.71 -2,654.48 5,958,314.089 704,349.056 5.75 6,169.15 10,999.17 53.76 324.58 8,600.05 8,525.45 5,599.55 -2,669.39 5,958,334.501 704,333.581 6.58 6,194.09 11,030.99 55.57 324.65 8,618.45 8,543.85 5,620.71 -2,684.42 5,958,355.240 704,317.974 5.69 6,219.38 11,061.37 56.89 323.53 8,635.34 8,560.74 5,641.16 -2,699.23 5,958,375.276 704,302.605 5.32 6,243.93 11,096.50 59.02 324.67 8,653.98 8,579.38 5,665.28 -2,716.69 5,958,398.906 704,284.492 6.66 6,272.88 11,124.50 61.18 326.63 8,667.94 8,593.34 5,685.32 -2,730.38 5,958,418.560 704,270.256 9.81 6,296.82 11,155.83 63.26 328.86 8,682.54 8,807.94 5,708.76 -2,745.16 5,958,441.584 704,254.830 9.15 6,323.92 11,187.48 65.78 331.06 8,696.16 8,621.56 5,733.49 -2,759.46 5,958,465.912 704,239.860 10.14 6,352,24 11,218.82 67.92 332.13 8,708.48 8,633.88 5,758.84 -2,773.17 5,958,490.870 704,225.463 7.52 6,380.89 11,250.18 69.58 331.75 8,719.84 8,645.24 5,784.63 -2,786.91 5,958,516.272 704,211.010 5.41 6,409.97 11,281.92 71.95 331.83 8,730.30 8,655.70 5,811.04 -2,801.08 5,958,542.277 704,196.124 7.47 6,439.78 11.23B TIP 11,287.00 72.36 331.85 8,731.85 8,657.25 5,815.30 -2,803.36 5,958,546.476 704,193.726 8.48 6,444.59 11-23B KOP-OHST 11,312.95 70.65 332.09 8,740.08 8,665.48 5,837.03 -2,814.92 5,958,567.873 704,181.570 6.72 6,469.06 11,344.17 72.27 330.72 8,750.01 8,675.41 5,863.01 -2,829.09 5,958,593.459 704,166.893 6.65 6,498.51 11,376.08 74.32 328.14 8,759.18 8,684.58 5,889.32 -2,844.64 5,958,619.329 704,150.430 10.06 6,528.75 11,408.59 77.18 325.81 8,767.18 8,692.58 5,915.73 -2,861.81 5,958,645.256 704,132.537 11.21 6,559.71 11,438.23 80.45 324.81 8,772.93 8,698.33 5,939.64 -2,878.36 5,958,668.695 704,115.339 11.52 6,588.12 11,470.02 85.13 324.41 8,776.92 8,702.32 5,965.34 -2,896.62 5,958,693.885 704,096.378 14.77 6,618.84 11,501.62 90.45 323.73 8,778.14 8,703.54 5,990.90 -2,915.14 5,958,718.923 704,077.160 16.97 6,649.52 11,533.03 91.18 324.36 8,777.69 8,703.09 6,016.32 -2,933.58 5,958,743.827 704,058.028 3.07 6,680.05 11,627.46 92.07 327.38 8,775.02 8,700.42 6,094.45 -2,986.54 5,958,820.460 704,002.946 3.33 6,772.45 11,721.25 90.62 326.94 8,772.81 8,698.21 6,174.10 -3,036.00 5,958,898.715 703,951.312 2.27 6,864.93 5/17@018 3:54:26PM Page 7 COMPASS 5000.1 Build 81D ntibP Final SBP urvey Report �JUGHES GE[Omp3ny Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 11-23 Project: PBU ND Reference: 11-238 Actual a 74.60usft (P272 Actual) Site: 11 MD Reference: 11-23B Actual @ 74.60usft (P272 Actual) Well: 11-23 North Reference: True Wellbore: 11-23B Survey Calculation Method: Minimum Curvature Design: 11-23B Database: EDM R5K - Alaska PROD - ANCPt Survey MD Inc An (azimuth) TVD TVDSS NIS E/W Nordling Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (waft) (usft) (°1100usft) (usft) 11,816.18 90.54 329.54 6,771.85 8,697.25 6,255.67 -3084.55 5,958,978.913 703,900.539 0.64 6,958.84 11,910.90 90.54 329.87 8,770.96 8,696.36 6,337.45 -3,132.33 5,959,059.344 703,850.529 0.35 7,052.65 12,003.35 91.28 330.60 8,769.49 8,694.89 6,417.69 -3,178.22 5,959,130,288 703,802.450 1.12 7,144.32 12,099.07 91.27 332.88 8,767.36 8,692.76 6,501.98 -3,223.52 5,959,221.289 703,754.842 2.38 7,239.50 12,192.33 91.52 332.16 8,765.09 8,690.49 6,584.69 -3,266.54 5,959,302.782 703,709.563 0.82 7,332.36 12,286.92 92.17 329.64 8,762.05 8,687.45 6,667.29 -3,312.52 5,959,384.081 703,661.335 2.75 7,426.24 12,380.99 92.97 331.32 8,757.83 8,683.23 6,749.06 -3,358.82 5,959,464.543 703,612.801 1.98 7,51948 12,475.85 92.75 329.21 8,753.09 8,678.49 6,831.32 -3,405.81 5,959,545.476 703,563.568 2.23 7,613.44 12,570.52 92.66 330.57 8,748.63 8,674.03 6,913.13 -3,453.25 5,959,625.938 703,513.898 1.44 7,707.14 12,665.46 92.59 329.92 8,744.28 8,669.68 6,995.46 -3,500.31 5,959,706.942 703,464.584 0.69 7,801.19 12,698.08 92.37 330.28 8,742.87 8,668.27 7,023.71 -3,516.56 5,959,734.735 703,447.567 1.29 7,833.50 12,729.91 92.19 331.97 8,741.60 8,667.00 7,051.56 -3,531.92 5,959,762.149 703,431.449 5.34 7,865.10 12,759.74 92.19 334.92 8,740.46 8,665.86 7,07822 -3,54524 5,959,788.432 703,417.397 9.88 7,894.83 12,794.47 91.82 338.41 8,739.24 8,66464 7,110.09 -3,558.99 5,959,819.904 703,402.779 10.10 7,929.52 12,825.84 91.79 339.59 8,738.26 8,663.66 7,139.36 -3,570.22 5,959,848.854 703,390.742 3.76 7,960.87 12,855.64 91.83 339.54 8,737.31 8,662.71 7,167.27 -3,580.82 5,959,876466 703,379.579 0.21 7,990.64 12,949.26 91.89 337.45 8,734.28 8,659.68 7,254.32 -3,614.92 5,959,962.537 703,342.898 2.23 8,084.19 13,043.57 91.89 339.58 8,731.16 8,656.56 7,342.03 -3,649.44 5,960,049.253 703,305.977 2.26 8,17843 13,138.30 91.76 337.44 8,728.15 8,653.55 7,430.12 -3,684.13 5,960,136.354 703,268.883 2.26 6,273.10 13,234.05 91.70 333.21 8,725.26 8,650.66 7,517.07 -3,724.07 5,960,222.165 703,226.561 4.42 8,368.71 13,327.54 92.38 335.87 8,721.93 8,647.33 7,601.42 -3,76423 5,960,305.372 703,184.096 2.93 8,461.99 13,422.45 91.85 339.10 8,718.42 8,643.82 7,689.02 -3,800.55 5,960,391.939 703,145.387 3.45 8,556.82 13,517.82 91.83 338.39 8,715.36 8,640.76 7,777.86 -3,835.10 5,960,479.786 703,108.401 0.74 8,652.13 13,612.20 91.77 339.81 8,712.40 8,637.80 7,865.98 -3,868.75 5,960,566.946 703,072.338 1.51 8,746.43 13,707.53 91.80 343.09 8,709.43 8,634.83 7,956.30 -3,899.06 5,960,656.394 703,039.555 3.44 8,841.49 13,738.32 91.79 343.74 8,708.46 8,633.86 7,985.80 -3,907.85 5,960,685.634 703,029.963 2.11 8,872.10 13,770.22 91.89 345.84 8,707.44 8,632.84 8,016.56 -3,916.21 5,960,716.155 703,020.755 6.59 8,903.74 5117/2018 3:54:26PM Page 8 COMPASS 5000.1 Build 81D BP y`ty bpFinal Survey Report BATYGHES E-Pany Company: North America -ALASKA -BP Local C"rdlnata Rderanco: Well 11-23 Project: PBU TVD Reference: 11-238 Actual @ 74.60usft (P272 Actual) Site: 11 MD Ref mance: 11-23B Actual @ 74.60us6 (P272 Actual) Well: 11-23 North Ref mance: True Wellbore: 11-23B Survey Calculation Method: Minimum Curvature Design: 11-23B Database: EDM RSK - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Earning D1.99 V. Sec (usft) (I V) lush) (usft) (usft) (usft) (uaft) (usft) (°110cuaft) (usft) 13,800.67 91.80 348.52 8,705.46 8,631.86 8,046.24 -3,922.96 5,960,745.629 703,013.189 8.80 8,933.7E 13,833.66 91.79 348.61 8,705.42 8,630.82 8,078.56 -3,929.50 5,960,777.755 703,005.765 0.27 8,966.12 13,896.12 92.07 349.61 8,703.32 8,628.72 8,139.86 -3,941.29 5,960,838.703 702,992.289 1.66 9,027.30 13,927.02 93.07 354.02 8,701.93 8,627.33 8,170.40 -3,945.69 5,960,869.116 702,987.056 14.62 9,057.22 13,959.47 91.85 355.75 8,700.54 8,625.94 8,202.69 -3,948.58 5,960,901.311 702,983.278 6.52 9,088.18 13,990.27 91.51 356.17 8,699.64 8,625.04 8,233.40 -3,950.75 5,960,931.949 702,980.265 1.75 9,117.40 14,02246 91.58 356.11 8,698.77 8,624.17 8,265.51 -3,952.91 5,960,963.980 702,977.216 0.29 9,147.91 14,084.67 91.89 355.83 6,696.89 8,622.29 8,327.53 -3,957.28 5,961,025.861 702,971.140 0.67 9,206.94 14,178.82 93.06 356.49 8,692.83 8,618.23 8,421.18 -3,963.57 5,961,119.297 702,962.278 1.43 9,295.93 14,273.65 93.27 352.78 8,687.58 8,612.98 8,515.64 -3,972.44 5,961,213.465 702,950.812 3.90 9,388.65 14,366.91 92.16 352.36 8,683.16 8,608.56 8,608.01 -3,984.49 5,981,305.465 702,938.228 1.27 9,476.66 14,46026 92.10 356.72 8,679.68 8,605.08 8,701.25 -3,993.40 5,961,398.417 702,924.753 4.65 9,566.27 14,556.28 92.01 0.56 '8,676.25 8,601.65 8,796.76 -3,995.67 5,961,493.827 702,919,857 4.01 9,65546 14,650.17 92.07 - 4.54 8,672.90 8,598.30 8,890.48 3,99149 5,961,587.821 702,921.449 4.24 9,740.54 14,744.93 92.10 :6.71 8,669.46 8,594.86 8,984.71 -3,982.21 5,961,682.071 702,928.132 2.29 9,824.15 14,838.49 92.32 -'- 3.10 -" '8,665.85 8,591.25 9,077.85 -3,974.22 5,961,775.384 702,933.558 3.86 9,907.22 14,933.71 95.13 3.91 8,659.66 8,585.06 9,172.68 -3,968.41 5,961,870.334 702,936.752 3.07 9,99271 14,966.50 97.74 4.70 8,655.99 8,581.39 9,205.17 -3,965.97 5,961,902.875 702,938.302 8.31 10,021.83 14,997.54 98.41 5.15 8,651.83 8,577.03 9,235.78 -3,963.33 5,961,933.553 702,940.096 2.59 10,049.14 15,028.87 100.09 4.72 8,646.59 8,571.99 9,266.59 -3,960.67 5,961,964.420 702,941.907 5.53 10,076.61 15,061.37 101.58 4.84 8,640.48 8,565.88 9,298.40 -3,958.01 5,961,996.288 702,943.690 4.60 10,105.02 15,095.45 103.38 6.36 8,633.12 8,558.52 9,331.51 -3,954.76 5,962,029.477 702,946.022 6.85 10,13440 15,121.75 104.75 6.74 8,626.72 8,552.12 9,356.86 -3,951.85 5,962,054.891 702,948.233 5.39 10,156.73 15,157.00 104.75 6.74 8,617.75 8,543.15 9,390.71 -3,947.85 5,962,088.839 702,951.300 0.00 10,186.51 Projection to TD - 41/2" Production Liner 5/172018 3:54:26PM Page 9 COMPASS 5000.1 Build 81D BP bp Final Survey Report Company: North America - ALASKA - BP Project: PBU Site: 11 Well: 11-23 Wellbore: 11-23B Design: 11-23B 15,157.00 8,617.75 4 1/2' Production Liner Design Annotations Measured Vertical Local Coordinates Depth Depth +NI -S +E/ -W (usft) (usft) (usft) (usft) Comment 11,281.92 8,730.30 5,811.04 -2,801.08 11-23B TIP 11,287.00 8,731.85 5,815.30 -2,803.36 11-23B KOP-OHST 15,157.00 8,617.75 9,390.71 -3,947.85 Projection to TD Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: 4.500 4.500 BA ER F�IGHES Well 11-23 11-238 Actual @ 74.60usft (P272 Actual) 11-23B Actual @ 74.60usft (P272 Actual) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes a GE Company &172018 3:54:26PM Page 10 COMPASS 5000.1 Build 81D by North America - ALASKA - BP PBU 11 11-23 11-23BPB1 5002921606.0 Design: 11-23BPB1 Final Survey Report 17 May, 2018 BAF IGHES BAT GE company Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27.OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1588, Using geodetic scale factor Site 11, TR -11-15 Site Position: From: Map Position Uncertainty: 0.00 usft Well 11-23 Well Position -NIS 0.00 usft +EI -W 0.00 usft Position Uncertainty 0.00 usft Wellbore 11-23BP81 Magnetics Model Name BGGM2017 Design 11-23BPB1 Audit Notes: Version: 1.0 Vertical Section: Northing: 5,949,527.780 usft BP BA4GHES by Longitude: Final Survey Report 0.000 in Grid Convergence: Northing: 5,952,810.850 usft oc�omoanv Company: North America - ALASKA - BP Local Coordinate Reference: Well 11-23 Project: PBU TVD Reference: 11-238 Actual @ 74.60usft (P272 Actual) Site: 11 MD Reference: 11-23B Actual @ 74.60usft (P272 Actual) Well: 11-23 North Reference: True Wellbore: 11-238PB1 Survey Calculation Method: Minimum Curvature Design: 11-23BPB1 Database: EDM R5K - Alaska PROD - ANCPI Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27.OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1588, Using geodetic scale factor Site 11, TR -11-15 Site Position: From: Map Position Uncertainty: 0.00 usft Well 11-23 Well Position -NIS 0.00 usft +EI -W 0.00 usft Position Uncertainty 0.00 usft Wellbore 11-23BP81 Magnetics Model Name BGGM2017 Design 11-23BPB1 Audit Notes: Version: 1.0 Vertical Section: Northing: 5,949,527.780 usft Latitude: Easting: 707,585.650 usft Longitude: Slot Radius: 0.000 in Grid Convergence: Northing: 5,952,810.850 usft Latitude: Easting: 707,155.970 usft Longitude: Wellhead Elevation: 28.45 usft Ground Level: Sample Date Declination Dip Angle Field Strength (1 (1) (nT) 5/1/2018 1746 80.08 57,473 Phase: ACTUAL Tie On Depth: 6,114.60 Depth From (TVD) -NI-S +El -W Direction (usft) (usft) (usft) (1) 4615 0.00 0.00 341.00 701 15'55.850 N 1481 19' 17.134 W 1.58' 701 16'28.245 N 148° 19'27.005 W 27.90 usft 51172018 3:38:48PM Page ^ COMPASS 5000.1 Build 81D BP by Final Survey Report BAF�UGHES rompeiry Company: North America - ALASKA - BP Inc Project: PBU TVD Site: 11 TVDSS Well: 11-23 E/W Wellbore: 11-23BPB1 Easting Design: 11-23BPB1 V. Sec Survey Program Date 5/17/2018 (°) From To (usft) (usft) (usft) Survey (Wellbore) Tool Nam 117.60 598.60 Sperry Boss Gyro MS WRP 57.0' Copy (11 BOSS -GYRO 598.60 6,114.60 MWD (11-23) MWD 6,443.00 13,705.46 BHGE OTK MWD IIFR_MSA 81/2" (11-23 MWD+IFR+MS-WOCA Survey Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Description Sperry -Sun BOSS gyro multishot MWD - Standard MWD + IFR + Multi Station W10 Crustal Well 11-23 11-23B Actual @ 74.60usit (P272 Actual) 11-23B Actual @ 74.60usft (P272 Actual) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°HOOusilt) (usft) 46.15 0.00 0.00 46.15 -28.45 0.00 0.00 5,952,810.850 707,155.970 0.00 0.00 117.60 1.10 162.50 117.60 43.00 -0.65 0.21 5,952,810.202 707,156.194 1.54 -0.69 126.60 1.08 162.48 126.59 51.99 -0.82 0.26 5,952,810.040 707,156.250 0.20 -0.86 20" 217.60 0.90 162.20 217.58 142.98 -2.32 0.73 5,952,808.554 707,156.768 0.20 -2.43 317.60 0.90 163.70 317.57 242.97 -3.82 1.20 5,952,807.066 707,157.270 0.02 -4.00 417.60 1.10 - 172.00 - .. 417.55 342.95 -5.52 1.55 5,952,805.372 707,157.671 0.25 -5.73 598.60 3.80 285.80 _ 59842 523.82 -5.61 -3.98 5,952,805.132 707,152.144 2.41 -4.01 719.60 8.30 280.80 718.72 644.12 -1.42 -16.01 5,952,808.994 707,140.005 3.74 3.87 810.60 10.80 -- 290.10 - 808.45 733.85 3.85 -30.16 5,952,813.866 707,125.717 2.75 13.46 902.60 11.10 296.40 898.78 824.18 10.75 -46.19 5,952,820.322 707,109.506 1.34 25.20 961.60 10.50 298.10 956.74 882.14 15.81 -56.02 5,952,825.107 707,099.542 1.15 33.18 1,142.60 10.30 314.00 1,134.80 1,060.20 34.82 -82.21 5,952,843.390 707,072.836 1.58 59.68 1,263.60 14.40 328.70 1,253.00 1,178.40 55.20 -97.82 5,952,863.336 707,056.673 4.24 84.04 1,357.60 16.70 342.80 1,343.59 1,268.99 78.10 -107.89 5,952,885.949 707,045.976 4.69 108.97 1,452.60 20.00 342.10 1,433.74 1,359.14 106.61 -116.92 5,952,914.195 707,036.163 3.48 138.86 1,546.60 22.60 342.10 1,521.32 1,446.72 139.10 -127.42 5,952,946.382 707,024.779 2.77 173.00 1,641.60 26.50 342.40 1,607.71 1,533.11 176.69 -139.44 5,952,983.622 707,011.725 4.11 212.45 1,734.60 29.30 343.80 1,689.89 1,615.29 218.33 -152.07 5,953,024.895 706,997.959 3.09 255.93 1,829.60 32.30 344.50 1,771.49 1,696.89 265.12 -165.34 5,953,071.302 706,983.406 3.18 304.50 1,922.60 34.80 343.10 1,848.99 1,774.39 314.46 -179.69 5,953,120.230 706,967.696 2.81 355.83 511712018 3:38:48PM Page 3 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP Project PBU Site: 11 Well: 11-23 Wellbore: 11-23BPB7 Design: 11-23BPB7 Survey MD Inc Well 11-23 (usft) 1°1 11-238 Actual @ 74.60usft (P272 Actual) 1,984.60 36.70 2,182.60 34.60 2,276.60 36.50 2,465.60 38.80 2,557.60 42.80 2,652.60 46.10 2,748.60 46.40 2,753.60 46.41 13 3l8" (usft) 3,118.60 47.10 3,554.60 50.20 3,803.60 51.90 3,927.60 50.10 4,116.60 51.90 4,336.60 50.00 4,525.60 49.00 4,928.60 45.80 5,242.60 45.10 5,554.60 48.10 5,867.60 50.80 6,114.60 53.50 11-23BPB1 TIP 510.30 6,443.00 54.73 KOP-TOWS - 9 518" Surface Casing 6,473.36 51.18 BOWS 562.03 6,563.51 46.84 Interpolated Azimuth 623.25 BP MI ER Final Survey Report Vq, Eq crmmpa�v Local Coordinate Reference: Well 11-23 TVD Reference: 11-238 Actual @ 74.60usft (P272 Actual) MD Reference: 11-238 Actual @ 74.60usft (P272 Actual) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 AN (azimuth) TVD TVDSS NIS ENV Northing Easfing DLeg V. Sec (°) (usft) (usft) (waft) (usft) (usft) (usft) (°1100usft) (usft) 340.30 1899.31 1,824.71 348.84 -191.08 5,953,154.277 706,955.365 4.04 392.04 342.10 2,060.20 1,985.60 458.05 -228.31 5,953,262.418 706,915.146 1.19 507.42 343.80 2,136.67 2,062.07 510.30 -244.32 5,953,314.204 706,897.710 2.28 562.03 353.70 2,288.44 2,211.84 623.25 -266.52 5,953,426.499 706,872.407 3.42 676.07 355.80 2,356.08 2,281.48 683.10 -271.98 5,953,486.171 706,865.307 4.60 734.43 356.50 2,423.88 2,349.28 749.47 -276.43 5,953,552.387 706,859.027 3.51 798.63 357.60 2,490.27 2,415.67 818.72 -280.00 5,953,621.512 706,853.555 0.88 865.28 357.50 2,493.72 2,419.12 822.34 -280.15 5,953,625.124 706,853.301 1.47 868.75 350.20 2,743.97 2,669.37 1,086.32 -308.70 5,953,888.205 706,817.502 1.47 1,127.64 348.10 3,032.00 2,957.40 1,407.67 -370.43 5,954,207.716 706,746.946 0.80 1,451.59 344.50 3,188.56 3,113.86 1,595.73 -416.35 5,954,394428 706,695.870 1.32 1,644.35 340.70 3,266.61 3,192.01 1,687.66 -445.12 5,954,485.531 706,664.584 2.79 1,740.64 ,. 341.70 3,385.55 3,310.95 1,82670 -492.43 5,954,623.210 706,613.460 1.04 1,887.51 397.50 3,524.18 3,449.58 1,986.80 -551.88 5,954,781.598 706,549.630 1.72 2,058.24 337.90 .3,646.92 3,572.32 2,119.76 -606.42 5,954,913.004 706,491.457 0.55 2,201.71 340.30 3,919.69 3,845.09 2,396.76 -712.37 5,955,186.965 706,377.931 0.91 2,498.11 340.00 4,139.97 4,065.37 2,607.23 -788.34 5,955,395.256 706,296.191 0.23 2,721.85 338.90 4,354.32 4,279.72 2,819.45 -867.96 5,955,605.189 706,210.770 1.00 2,948.42 337.90 4,557.79 4,483.19 3,040.53 -955.54 5,955,823.770 706,117.142 0.90 3,185.98 336.80 4,709.34 4,634.74 3,220.49 -1,030.67 5,956,001.584 706,037.089 1.15 3,380.59 335.19 4,901.84 4,827.24 3,463.52 -1,138.93 5,956,241.525 705,922.186 0.55 3,645.62 333.90 4,920.12 4,845.52 3,485.40 -1,149.33 5,956,263.107 705,911.181 12.17 3,669.70 332.90 4,979.24 4,904.64 3,546.23 -1,179.78 5,956,323.081 705,879.076 4.89 3,737.13 5/172018 3.38:48PM Page 4 COMPASS 5000.1 Build 810 BP BA ER by Final Survey Report FVgME 0 �E�om��v Company: North America - ALASKA - BP Local Coordinate Reference: Well 11-23 Project: PBU TVO Reference: 11-23B Actual @ 74.60usft (P272 Actual) Site: 11 MD Reference: 11-23BActual @ 74.60usR (P272 Actual) Well: 11-23 North Reference: True Wellbore 11-23BPB1 Survey Calculation Method: Minimum Curvature Design: 11-23BPB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Az, (azimuth) ND TVDSS N/S VW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) Wait) (usft) (usft) (usft) (usft) (°/100usft) (usft) 6,628.49 45.69 330.10 5.024.17 4,949.57 3,587.49 -1,202.17 5,956,363.704 705,855.561 3.58 3,783.42 6,659.08 45.05 329.63 5,045.66 4,971.06 3,606.32 -1,213.10 5,956,382.223 705,844.119 2.36 3,804.79 6,689.13 44.35 328.34 5,067.02 4,992.42 3,624.43 -1,223.98 5,956,400.030 705,832.735 3.81 3,825.46 fi 722.51 44.11 328.95 5,090.94 5,016.34 3,644.32 -1,236.10 5,956,419.571 705,820.077 1.46 3,848.21 6,753.02 44.06 328.58 5,112.85 5,038.25 3,662.47 -1,247.11 5,956,437.410 705,808.576 0.86 3,868.95 6,849.82 42.78 327.11 5,183.16 5,108.56 3,718.80 -1,282.51 5,956,492.741 705,771.641 1.68 3,933.74 6,944.21 40.30 326.77 5,253.81 5,179.21 3,771.26 -1,316.65 5,956,544.237 705,736.072 2.64 3,994.45 7,038.19 38.12 325.68 5,326.62 5,252.02 3,820.64 -1,349.66 5,956,592.694 705,701.712 2.43 4,051.89 7,133.44 36.08 325.80 5,402.59 5,327.99 3,868.13 -1,382.00 5,956,639.266 705,668.075 2.14 4,107.32 7,228.94 34.94 325.68 5,480.33 5,405.73 3,913.97 -1,413.23 5,956,684.233 705,635.600 1.20 4,160.83 7,323.37 34.79 324.80 5,557.81 5,483.21 3,958.32 -1,444.01 5,956,727.713 705,603.618 0.56 4,212.78 7,419.47 34.02 324.90 5,637.09 5,56249 4,002.72 -1,475.27 5,956,771.231 705,571.147 0.80 4,264.94 7,514.17 33.98 324.26 5,715.60 5,641.00 4,045.87 -1,505.96 5,956,813.522 705,539.281 0.38 4,315.73 7,608.84 34.02 324.48 5,794,09 5,719.49 4,088.90 -1,536.60 5,956,855.883 705,507.271 0.14 4,366.45 7,703.70 33.94 323.44 5,872.75 5,798.15 4,131.77 •1,567.99 5,956,897.675 705,474.913 0.62 4,417.14 7,799.09 34.02 321.82 5,951.85 5,877.25 4,174.13 -1,600.35 5,956,939-133 705,441.403 0.95 4,467,7- 7,893,46 33.98 320.14 6,030.09 5,955.49 4,215.13 -1,633.57 5,956,979.196 705,407.068 1.00 4,517.31 7,988.58 34.02 319.90 6,108.95 6,034.35 4,255.89 -1,667.74 5,957,018.996 705,371.784 0.15 4,566.97 8,083.25 33.37 319.37 6,187.72 6,113.12 4,295.91 -1,701.76 5,957,058.060 705,336.684 0.75 4,615.88 8,177.74 33.37 318.79 6,266.63 6,192.03 4,335.18 -1,735.80 5,957,096.378 705,301.575 0.34 4,664.10 8,272.50 33.26 318.92 6,345.81 6,271.21 4,374.37 -1,770.04 5,957,134.612 705,266.266 0.14 4,712.30 8,367.58 33.24 320.82 6,425.33 6,350.73 4,414.23 -1,803.64 5,957,173.524 705,231.587 1.10 4,75092 8,462.45 33.21 321.98 6,504.69 6,430.09 4,454.85 -1,836.07 5,957,213.237 705,198.053 0.67 4,809.89 8,558.11 33.31 321.84 6,584.68 6,510.08 4,496.14 -1,868.43 5,957,253.620 705,164.566 0.13 4,859.47 8,652.23 33.25 320.95 6,663.37 6,588.77 4,536.50 -1,900.66 5,957,293.075 705,131.245 0.52 4,908.12 8,748.19 33.25 321.16 6,743.62 6,669.02 4,577.42 -1,933.73 5,957,333.067 705,097.061 0.12 4,957.57 8,842.79 33.19 321.65 6,822.76 6,748.16 4,617.93 -1,966.06 5,957,372.666 705,063.629 0.29 5,006.40 57172018 3:38:48PM Page 5 COMPASS 50001 Build 810 BP by Final Survey Report 113AFVR GEcumOany Company: Project: Site: Well: Wellbore: Design: Survey North America - ALASKA- BP PBU 11 11-23 11-23BPB1 11-23BPB1 MD Inc (usft) (°) 8,938 17 9,033.11 9,128.44 9,223.38 9,318.09 9,413.02 9,508.00 9,602.91 9,697.62 9,794.09 9,888.54 9,983.23 10,076.63 10,172.22 10,268.24 10,362.71 10,458.32 10,552.49 10,584.44 10,615.00 DRILLING LINER 1 10,652.84 10,683.66 10,715.03 10,746.91 10,777.57 10,810.08 Local Coordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 11-23 11-23B Actual 74.60usft (P272 Actual) 11-23B Actual 74.60usft (P272 Actual) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 51172018 3:38:48PM Page 6 COMPASS 5000.1 Build 81D Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (°) (usft) (welt) (usft) (usft) (usft) (usft) (°HOousft) (usft) _ 33.10 322.94 6,902.62 6,828.02 4,659.18 -1,997.95 5,957,413.027 705,030.614 0.75 5,055.75 33.28 322.10 6,982.07 6,90747 4,700.43 -2,029.58 5,957,453.380 704,997.868 0.52 5,105.08 33.33 322.05 7,061.74 6,987.14 4,741.72 -2,061.75 5,957,493.768 704,964.572 0.06 5,154.59 33.38 322.17 7,141.05 7,066.45 4,782.91 -2,093.81 5,957,534.064 704,931.393 0.09 5,203.98 33.25 322.37 7,220.19 7,145.59 4,824.05 -2,125.64 5,957,574.311 704,898.442 0.18 5,253.24 33.40 321.00 7,299.51 7,224.91 4,864.97 -2,157.97 5,957,614.321 704,864.996 0.81 5,302.46 33.14 320.43 7,378.93 7,304.33 4,905.30 -2,190.97 5,957,653.725 704,830.909 0.43 5,351.33 33.29 320.08 7,458.33 7,383.73 4,945.27 -2,224.21 5,957,692.767 704,796.582 0.26 5,399.95 33.31 320.53 7,537.49 7,462.89 4,985.28 -2,257.42 5,957,731.845 704,762.284 0.26 5,448.59 33.32 321.68 7,618.11 7,543.51 5,026.52 -2,290.69 5,957,772.148 704,727.895 0.65 5,498.41 32.46 323.59 7,697.42 7,622.82 5,067.27 -2,321.82 5,957,812.027 704,695.656 1.43 5,547.07 32.79 324.65 7,777.17 7,702.57 5,108.64 -2,351,73 5,957,852.549 704,664.612 0.70 5,595.92 33.23 324.56 7,857.17 7,782.57 5,151.00 -2,381.84 5,957,894.069 704,633.356 0.46 5,645.78 33.30 324.29 7,935.42 7,860.82 5,192.76 -2,411.70 5,957,934.982 704,602.354 0.18 5,694.98 32.22 326.69 - 8,016.17 7,941.57 5,235.81 -2,441.07 5,957,977.002 704,571.817 1.85 5,745.06 30.50 329.75 8,096.84 8,022.24 5,277.42 -2,466.91 5,958,018.083 704,544.840 2.41 5,793.0C 30.74 329.96 8,179.12 8,104.52 5,319.53 -2,491.37 5,958,059.504 704,519.236 0.27 5,840.78 30.64 330.46 8,260.10 8,18550 5,361.24 -2,515.24 5,958,100.540 704,494.218 0.29 5,887.99 30.77 330.24 8,287.57 8,212.97 5,375.42 -2,523.32 5,958,114.490 704,485.761 0.54 5,904.02 31.37 330.13 8,313.75 8,239.15 5,389.10 -2,531.16 5,958,127.953 704,477.546 1.98 5,919.52 32.12 330.00 8,345.93 8,271.33 5,406.36 -2,541.09 5,958,144.925 704,467.139 1.98 5,939.06 33.32 330.20 8,371.86 8,297.26 5,420.80 -2,549.40 5,958,159.132 704,458.441 3.91 5,955,42 35.01 329.38 8,397.81 8,323.21 5,436.02 -2,558.26 5,958,174.103 704,449.160 5.58 5,972.70 37.20 328.81 8,423.57 8,348.97 5,452.14 -2,567.91 5,958,189.947 704,439.071 6.95 5,99108 39.31 327.31 8,447.64 8,373.04 5,468.24 -2,577.96 5,958,205.768 704,428.585 7.52 6,009.58 41.55 327.05 8,472.39 8,397.79 5,485.96 -2,589.39 5,958,223.162 704,416.675 6.91 6,030.05 51172018 3:38:48PM Page 6 COMPASS 5000.1 Build 81D BP BA ER by Final Survey Report FUGHES p y Company: North Amedca- ALASKA - BP Local Co-0rdinate Reference: Well 11-23 Project: PBU TVD Reference: 11-230 Actual Q 74.60usft (P272 Actual) Site: 11 MD Reference: 11-23B Actual Q 74.60usft (P272 Actual) Well: 11-23 North Reference: True Wellbore: 11-23BPB1 Survey Calculation Method: Minimum Curvature Design: 11-23BPB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc AN (azimuth) TVD TVDSS NIS EIW Northing Earning DLeg V. Sec (usft) n (I (usft) (usft) (usft) (usft) Net) (wait) (°MOousft) (usfU _ 10,841.35 42.99 325.49 8,495.53 8,420.93 5,503.44 -2,601.07 5,958,240.322 704,404.517 5.70 6,050.3< 10,871.84 44.76 324.92 8,517.51 8,442.91 5,520.80 -2,613.13 5,958,257.334 704,391.985 5.95 6,070.72 10,904.47 47.43 324.44 8,540.13 8,465.53 5,539.98 -2,626.72 5,958,276.131 704,377.870 8.25 6,093.28 10,936.44 49.91 324.41 8,561.24 8,486.64 5,559.50 -2,640.69 5,958,295.262 704,363.373 7.76 6,116.29 10,966.97 51.66 324.24 8,580.54 8,505.94 5,578.71 -2,65448 5,958,314.089 704,349.056 5.75 6,138.94 10,999.17 53.76 324.58 8,600.05 8,525.45 5,599.55 -2,669.39 5,958,334.501 704,333.581 6.58 6,163.49 11,030.99 55.57 324.65 8,618.45 8,543.85 5,620.71 -2,684.42 5,958,355.240 704,317.974 5.69 6,188.40 11,061.37 56.89 323.53 8,635.34 8,560.74 5,641.16 -2,699.23 5,958,375.276 704,302.605 5.32 6,212.56 11096.50 59.02 324.67 8,653.98 8,579.38 5,665.28 -2,716.69 5,958,398.906 704,284.492 6.66 6,241.05 11,124.50 61.18 328.83 8,667.94 8,593.34 5,685.32 -2,730.38 5,958,418.560 704,270.256 9.81 6,26445 11,155.83 63.26 328.86 8,682.54 8,607.94 5,708.76 -2,745.16 5,958,441.584 704,254.830 9.15 6,291.43 11,187.48 65.78 331.06 8,696.16 8,621.56 5,733.49 -2,759.46 5,958,465.912 704,239.860 10.14 6,319.47 11,218.82 67.92 332.13 8,708.48 8,633.88 5,758.84 -2,773.17 5,958,490.870 704,225.463 7.52 6,347.89 11,250.18 69.58 371.75 8,719.84 8,645.24 5,784.83 -2,786.91 5,958,516.272 704,211.010 5.41 6,376.76 11,281.92 71.95 71.83 8,730.30 8,655.70 5,811.04 -2,801.08 5,958,642.277 704,196.124 7.47 6,406.33 11,313.92 74.65 1* 332.01 - 8,739.49 8,664.89 5,838.08 -2,815.50 5,958,568.909 704,180.961 8.45 6,436.6C 11,344.89 76.36 332.06 8,747.24 8,672.64 5,864.56 -2,829.56 5,958,594.992 704,166.178 5.52 6,468.21 11,376.75 77.86 331.55 8,754.35 8,679.75 5,891.93 -2,844.24 5,958,621.948 704,150.757 4.96 6,496.87 11,407.99 79.72 331.14 8,760.42 8,685.82 5,918.82 -2,858.93 5,958,648.421 704,135.328 6.09 6,527.08 1 11,438.51 81.72 330.74 8,765.35 8,690.75 5,945.15 -2,873.56 5,958,674.334 704,119.980 6.68 6,556.73 11469.63 84.10 330.60 8,789.19 8,694.59 5,972.07 -2,888.69 5,958,700.827 704,104.119 7.66 6,587.11 11,501.32 86.38 331.72 8,771.82 8,697.22 5,999.73 -2,903.92 5,958,728.058 704,088.133 8.01 6,618.23 11,533.37 87.10 331.02 8,773.64 8,699.04 6,027.82 -2,919.25 5,958,755.709 704,072.034 3.13 6,64977 11,565.74 89.89 331.34 8,774.49 8,699.89 6,056.16 -2,934.85 5,958,783.616 704,055.663 8.68 6,681.65 11,627.81 90.05 333.22 8,774.52 8,699.92 6,111.11 -2,963.72 5,958,837.741 704,025.293 3.04 6,743.00 11,721.99 90.11 331.53 8,774.39 8,699.79 6,194.55 -3,007.39 5,958,919.943 703,979.346 1.60 6,836.11 11,816.44 90.08 331.69 8,774.23 8,699.63 6,277.64 -3,052.30 5,959,001.762 703,932.170 0.17 6,929.30 5/172018 3:38:48PM Page 7 COMPASS 5000.1 Build 81D BP zWby Final Survey Report gUBAKGHES Emmp ny Company: North America - ALASKA - BP Local Coordinate Reference: Well 11-23 Project: PBU TVD Reference: 11-236 Actual@ 74.60usft (P272 Actual) Site: 11 MD Reference: 11-238 Actual @ 74.60us8 (P272 Actual) Well: 11-23 North Reference: True Wellbore: 11-23BPB1 Survey Calculation Method: Minimum Curvature Design: 11-23BPB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (ush) (`) (°) Waft) lush) (usft) (ustt) (usR) (usft) (°NOousft) (usft) 11,911.22 90.42 331.31 8,773.82 8,699.22 6,360.93 -3,097.52 5,959,083.774 703,884.672 0.54 7,022.7E 12,005.25 91.40 331.30 8,772.33 8,697.73 6,443.40 -3,142.66 5,959,164.967 703,837.279 1.04 7,115.45 12,099.51 91.61 331.56 8,769.85 8,695.25 6,526.16 -3,187.73 5,959,246.444 703,789.958 0.35 7,208.36 12,194.73 91.40 331.81 8,767.35 8,692.75 6,609.96 -3,232.87 5,959,328.963 703,742.522 0.34 7,30229 12,289.66 91.02 334.56 8,765.35 8,690.75 6,694.65 -3,275.68 5,959,412.443 703,697.398 2.92 7,396.31 12,384.18 90.97 332.88 8,763.70 8,689.10 6,779.38 .3,317.53 5,959,495.990 703,653.242 1.78 7,490.05 12,478.66 91.15 329.90 8,761.96 8,687.36 6,862.31 -3,362.75 5,959,577.629 703,605.750 3.16 7,563.18 12,573.50 92.01 328.58 8,759.34 8,684.74 6,943.77 -3,411.24 5,959,657.724 703,555.043 1.66 7,675.99 12,667.81 93.15 327.50 8,755.10 8,680.50 7,023.70 -3,461.11 5,959,736.247 703,502.996 1.66 7,767.80 12,762.16 91.91 329.72 8,750.93 8,676.33 7,104.16 -3,51020 5,959,815.318 703,451.712 2.69 7,859.85 12,856.75 89.09 333.84 8,750.10 8,675.50 7,187.47 -3,554.91 5,959,897.369 703,404.726 5.28 7,953.19 12,949.54 89.25 334.91 8,751.45 8,676.85 7,271.13 -3,595.03 5,959,979.882 703,362.316 1.17 8,045.34 13,043.82 87.12 333.16 ... X8,754.43 8,679.83 7,355.54 -3,636.29 5,960,063423 703,318.749 2.92 8,138.87 13,138.22 86.94 329.61 8,759.33 8,884.73 7,438.59 -3,681.43 5,960,144.890 703,271.349 3.76 8,231.80 13,233.12 91.13 330.24 8,760.93 8,686.33 7,520.68 -3,728.97 5,960,225.639 703,221.569 4.46 8,324.90 13,326.54 94.45 333.45 8,756.38 8,681.78 7,602.92 -3,772.99 5,960,306.636 703,175.304 4.94 8,417.00 13,422.51 94.38 338.09 8,748.99 8,674.39 7,690.16 -3,812.25 5,960,392.750 703,133.661 4.82 8,512.26 13,516.50 95.92 338.89 8,740.55 8,665.95 7,777.24 -3,846.57 5,960,478.855 703,096.956 1.84 8,605.77 13,612.65 95.14 342.05 8,731.28 6,656.68 7,86743 -3,878.56 5,960,568.120 703,062.499 3.37 8,701.46 13,643.29 96.61 343.82 8,728.14 8,653.54 7,896.56 -3,887.50 5,960,596.996 703,052.757 7.49 8,731.92 13,675.78 97.81 344.11 8,724.07 8,649.47 7,927.54 -3,896.40 5,960,627.716 703,043.004 3.80 8,764.11 13,705.46 99.91 344.69 8,719.50 8,644.90 7,955.78 -3,904.29 5,960,655.731 703,034.344 7.33 8,793.38 13,750.46 99.91 344.69 8,711.75 8,637.15 7,998.54 -3,916.00 5,960,698.145 703,021.468 0.00 8,837.62 Projection to TD 5/172018 3..38:48PM Page 8 COMPASS 5000.1 Build 810 5/17/2018 3:38:48PM Page 9 COMPASS 5000.1 Budd 81D BP BAF�UGHES by Final Survey Report GEmmpany Company: North America - ALASKA - BP Local Coordinate Reference: Well 11-23 Project: PBU TVD Reference: 11-23B Actual @ 74.60usft (P272 Actual) Site: 11 MD Reference: 11-23B Actual @ 74.60usft (P272 Actual) Well: 11-23 North Reference: True Wellbore: 11-23BPB1 Survey Calculation Method: Minimum Curvature Design: 11-23BPB1 Database: EDM R5K - Alaska PROD - ANCP1 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 6,443.00 4,901.84 9 5/8" Surface Casing 9.625 12.250 10,615.00 8,313.75 DRILLING LINER 1 7 000 9.875 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (uaft) (Ueft) (usft) (usft) Comment 6,114.60 4,709.34 3,22049 -1,030.67 11-23BPB1 TIP 6,443.00 4,901.84 3,463.52 -1,138.93 KOP-TOWS 6,473.36 4,920.12 3,485.40 -1,149.33 BOWS 6,563.51 4,979.24 3,546.23 -1,179.78 Interpolated Azimuth 13,750.46 8,711.75 7,998.54 -3,916.00 Projection to TD I Prepared By: Yosha Regbirsingh Survey Manager Baker Hughes a GE Company 5/17/2018 3:38:48PM Page 9 COMPASS 5000.1 Budd 81D WELLBORE DETAIL$: 11-238 fd:ffWT'CEKpNullOx „-238 faa4tle�(X'EIXNmrca We111RS irvpXW� v.n�.i Pv01Xa..rc.: 1.. T.3Pplel®>amuAry3MMuzO �,y�,A BpER !>•iY' yea eaopn Xebemr. tlaerwui®>4mwryinncs0 TI¢on MD: 11231.92 Cakuh4m ltalbl Ak:nunCuwWa GEmml>anv b iw Nnn Prolel PBU Site: 11 Well n uy�w'�x.u:vr "9'eF1° -z3 rWeb. 11-28 Desn:te(11-n11-sB) a•P�srn g .0 �� Post Drilling Easting (500 usG/in) Easting(500 usftfin) AOGCC b J O O O J P O O O g O O O O O O W W A O O O O m m m m J m O O O O O O 59625 W 59b2500 11-238 596p00 pp 8618 :59620W 0 595t5oo. 4 n" .opo op L2 -013A ,y00 sss,sa0 qi h 11-23 5961000 m - m N 9665 .5961000 qq 8 S �O D5W. 11-30 ' T1 38PB 69 800 OOB 5960500 �N SO 11 -09A 5951000'.' '1 8000 �`, "'in 5960000 11-30A m^p Y . 7500 5959500 - p 15 pa :5959500 0 0h -70 8500 5959000. 11 -289 co 5959DOD C 59s8500' 11-28A ry 6 g 484120 .g 0000 7500 2 59589Y)C) L3-23 50 p 5gr�pp. h$ @ 8500 -7000'5958900 - 11-28 0 0 O� OO 000 1 -10 MOO 00 5957500 -6000' 0 �p 5oo 500' 11-33 5951000'y�' d,6. 00 p5956500-. �® es 2y 5956500 Z q50 0 S 500 00000. S,yiWO-. O p pU d3 11-08 ) 5956000 ro y s5 1 SOo 5955500. h 4500 5955500 11-23BACTUAL 0 59550o0 os� a000 sow 5955000 o yp a 00 S SS 5954500 1p111 5950500 p0 80 60,00 5954000g �(2cP Do � SS; '5950 000 hM pt� y 0 � rA535pp. 0 y �00 .00 $953500 Lisburne Wp 1.0 o o 0 o am o o o '.5953000 5952500 59525W 11-13A m m 0 J O O N O _... - O O O O 11-13 — J Or3 O O O O O O O O O O O J W O a N O O O c. O J— J o m J O m m O m d O O O J O O O N O O Easting(500 usftfin) AOGCC N01001?L Post Drilling North America -ALASKA - BP PBU 11 11-23 11-23B 11-23B Anticollision Summary Report 17 May, 2018 BA ER BAT a GE company FAAarOTG4I TCO COO lo. BP by Anticollision Report BAF�UGHES E,..,, Company: North America - ALASKA - BP Project: POU Reference Site: 11 Site Error: 0,00usft Reference Well: 11-23 Well Error: 0.00usft Reference Wellbore 11-23B Reference Design: 11-23B Local Cc -ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 11-23 11-23BActual @ 74.60usft (P272 Actual) 11-238 Actual @ 74.60usft (P272 Actual) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 11-23B 'filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria To merpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00osft Error Surface: Elliptical Conic Survey Program Date 5/16/2018 From To (usft) (usft( Survey (Wellbore) Tool Name Description 117.60 598.80 Sperry Boss Gyro MS WRP 57.0' Copy (11 BOSS -GYRO Sperry -Sun BOSS gyro multishot 598.60 6,114.60 MWD (11-23) MWD MWD - Standard 6,443.00 11,281.92 BHGE MWD_IIFR_MSA 812"(11-23BPB MWD+IFR+MS-WOCA MWD +IFR+Multi Station W/O Crustal 11,287.00 15,121.75 BHGE MWD_IIFR_MSA_ 6-1/8"(11-23B) MWD+IFR+MS-WOCA MWD +IFR+Mulfi Station W/O Crustal Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) 11 11-08 - 11-08 - 11-08 514.24 500.00 297.90 12.66 285.24 Pass - Major Risk 11-09 - 11-09 - 11-09 843.75 825.00 53.13 16.18 36.98 Pass - Major Risk 11 -09 -11 -09A -11-09A 844.64 825.00 53.13 16.19 36.97 Pass - Major Risk 11-10 - 11-10 - 11-10 540.74 525.00 56.13 11.69 44,44 Pass - Major Risk 11 -10 -11 -10A -11-10A 540.74 525.00 56.13 11.69 44.44 Pass -Major Risk 11-11 - 11-11 - 11-11 586.69 575.00 174.65 11.97 162.68 Pass - Major Risk 11-13 - 11-13 - 11-13 558.47 550.00 413.36 11.81 401.55 Pass - Major Risk 11 -13 -11 -13A -11-13A 558.47 550.00 413.36 11.81 401.55 Pass -Major Risk 11-23- 11-23- 11-23 6,442.60 6,425.00 0.03 26.63 -19.38 FAIL - Major Risk 11 -23 -11 -23A -11-23A 11,379.92 11,450.00 167.08 198,42 -29.10 FAIL - Major Risk 11-23-11-23BP81-11-23BPB1 13,752.65 13,750.46 5.76 80,01 -59.79 FAIL - Major Risk 11-28-11-28-11-28 1,382.71 1,475.00 287.28 37.03 251.88 Pass -Major Risk 11 -28 -11 -28A -11-28A 1,388.30 1,475.00 287.47 37.22 251.91 Pass -Major Risk 11 -28 -11 -28B -11-28B 1,386.30 1,475.00 287.47 37.22 251.91 Pass -Major Risk 11-30-11-30-11-30 9,326.98 9,325.00 241.18 434.96 -184.46 FAIL - Major Risk 11 -30 -11 -30A -11-30A 9,326.98 9,325.00 241.18 429.17 -180.30 FAIL - Major Risk 11-33-11-33-11-33 510.91 500.00 207.74 9.36 198.41 Pass - Major Risk Plan Lisburne - Plan Lisburne - Lisburne Alp 1.0 565.54 550.00 112.96 13.24 99.71 Pass - Major Risk L2 1.2 -08 -L2 -08A -1.2-08A 14,408.71 15,588.00 235.55 387.84 -145.09 FAIL - Major Risk L3 1.3-23 - L3-23 - 1.3-23 11,031.19 10,350.00 317.86 272.74 53.18 Pass - Major Risk 5(17201811: 11:49AM // JJ // )6f(ge 2 of!T // - // COMPASS 5000.1 Build 81D BP by Anticollision Report BAF�UGHES E—pam Company: North America - ALASKA - BP Project: PBU Reference Site: 11 Site Error: 0 0ousft Reference Well: 11-23 Well Error: O.00usft Reference Wellbore 11-23B Reference Design: 11-23B Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 11-23 11-23B Actual @ 74.60usft (P272 Actual) 11-238 Actual @ 74.60usft (P272 Actual) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to 11-23B Actual @ 74.60usft (P272 Coordinates are relative to. 11-23 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK Central Meridian is 150` 0'0.000 W ° Gtltl Convergence at Surface is: 1.58° 5'172018 11: 11 49A // JJ " ) J �{ge 3 of! // v J/ V COMPASS 5000.1 Build 81D Printed 6/132016 147:34PM North America - ALASKA - BP Page 1 of 2 Cementing Report Common Well Name: 11-23 / 02 - _ - - - -- - -- - - -- - -- Report no.: 7 Report date: 5/6/2018 Protect: PBU Sae 11 Spud Daterlime: 7/11/1986 --- - Event Type: RE-ENTER- ONSHORE (RON) Start Date: 424/2018 Entl Date: 5/18/2018 AFE No.: Contractor PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rip Release: 5/202018 X3-018Y4-C: (6,086,993.00) SPUO1: USA00001229 - Active datum: 11-238 Actual @74.60usft (some Mean See Level) -- General Information Job type: Primary Cement job start date/time: 5/6/2018 330P Job end date/time. 5/6/2018 6:OOPM Cement Company: SCHLUMBERGER Cementer: DYLAN WAUGH Cemented String: INTERMEDIATE CASING 1 String Size: 7.000 (in) String Set TMD: 10,615.00 (usft) Hole Size: 9.875 (in) Pipe Movement Pipe Movement. RECIPROCATING Rotating Time (Start-End): RPM. Rotating Torque (Initlavg/max): (ft-1131) Reciprocating Time (Start-End). Recip Drag Up/Doom-. - (kip) SPM: Stroke Length: F1rNd Name: SPACER Fluids (1 of 2) Slurry Type: SPACER Purpose: SPACER Class: Description: MUD PUSH II Density: 12.00 (ppg) Yield: Mix Water Ratio: Excess: Mix Method: BATCH Sacks Used: Water Volume: 0.0 (bbl) Excess Slurry Volume: 0.0 (bbl) Density Measured by: Other Volume: Total Vol in Well: Slurry Volume: 40.0 (bbl) Excess Measured From: Mud Type: Density: 10.30 (ppg) PV: 9.00 (cp) YP: 18.000 (tbf/100fP) Viscosity: 37.00 (s/qt) Gels 10 Sec: 7.000 (Ibf/100ft2) Gels 10 Min: 9.000 (ibf/100ft-) Fluid Name: CEMENT Fluids (2 of 2) Slurry Type: CEMENT Purpose: PRIMARY Class: G-CLASS Description: TAIL SLURRY Density: 15.80 (ppg) Yield: 1.1600 (M/sk) Mix Water Ratio: 5.099 (gal/sk94) Excess: Mix Method: ON-THE-FLY Sacks Used: 468.50 (941b sacks) Water Volume: 56.9 (bbl) Excess Slurry Volume: Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 96.8 (lobi) Excess Measured From Mud Type: Density'. 10.30 (ppg) PV: 9.00 (cp) YP: 18.000 (Ib1110Dft2) Viscosity: 37.00 (s/qt) Gels 10 Seo 7.000 (Ibf1100W) Gels 10 Min: 9.000 (Ibf/100ft') AdUSWaa Name Type Amount Units Concentration Unit D047 ANTIFOAMAGENT 0.050 GAUSX D065 DISPERSANT 0.300 %BWOC D167 FLUID LOSS 0.400 % BWOC D177 RETARDER 0.015 GAUSX Printed 6/132016 147:34PM Printed 6/13/2018 1:47'.34PM Pape 2 of 2 North America - ALASKA - EIP Cementing Report Common Well Name: 11-23 / 02 Repo nn not Report tlale: 5/8/2018 Project. PBU site 11 Spud Dale/Time_7/11/1986_ Event Type: RE-ENTER- ONSHORE (RON) I Start Date: 4/24/2018 End Date5/16/2018 AFE No.: Contractor PARKER DRILLING CO. Rig Name/No.: PARKER 272 ,Rig Release: 5/20/2018 X3-018v4-C: (6,086,993.00 ) BPUOI: USA00001229 .I Active datum: 11-238 Actual @74 60usft (above Mean Sea Level) Fluid Tea% Thick time Thick Free water Free water Fluid lass Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength (hr) temp. (%) temp. (ccJ30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) (°F) ("F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) min(psi) °F) min 4.33 0.00 80.00 56.0 115.00 1,000.00 Stages Stage T Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Tap Bottom Plug Pressure Front Pressure Retums Circulate Cmt Vol to Total Annular no. (usft) (usft) Rale Press. Plug Plug Bumped Bumped Held Held Prior Surtace Mud Lost Flow Win (psi) (hr) (bbl) (bbl) After (moi) (min) 1 rRtMARY CEMENT 8,480.001 10,615,001 1 1 v I v v I I v Pumping Schedule Fluid pumped Volume Avg, Max Disp. Slurry ToSlurry Base Start Mix Clint Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumped Disp. Rate TWO TMD PmP date/time job Used temp. temp. (bbl) Rate (bbVmin) (usft) (usft) (scf) bbVmin Tests Casing Tut Shoe Test Liner Top Test Test Pressure. 3,500.00 (psi) FIT/LOT: (PPg) Liner Overlap: (usft) Time: 30 (min) Tool: N Positive Test: (ppg) Positive Tut Tool: N Cement Found between Shoe and Collar: N Open Hole Length: Well) Negative Test: (Ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Him Prior to Log: (hr) Haw Determined: Printed 6/13/2018 1:47'.34PM Pnnted 6/13/2018 1:48:34PM North America - ALASKA - BP Page i of 3 Cementing Report Common Well Name: 11-23103 , Report no 2 Report date 5/17/2018 Project: PBU Site: 11 -- - - Spud Date/Time: 7/11/1966 Event Type: COM- ONSHORE (CON) Start Date: 5/16,1018 End Date: 5/20/2018 AFE No.: Cordrerxar. PARKER DRILLING CO.Rig Name/No.: PARKER 272 Rig Release: 5/10/2018 X3-018Y4-C: (2,588,804.00) BPUOI: USA00001229 Active datum: 11-23B Actual ®74.60usft (above Mean Sea Level) eenwal information Job type: Primary Cement job start date/time: 5/17/2018 300A Job end date/time: 5/17/2018 6:OOAM Cement Company: SCHLUMBERGER Cementer: Cemented String: PRODUCTION LINER 1 String Size: 4.500 (in) String Set TMD: 15,155.00 (usft) Hole Size: 6.125 (in) Pipe Movement Pipe Movement: RECIPROCATING Rotating Time (Start-End): RPM. Rotating Torque (init/avg/max): (ft-lbo Reciprocating Time (Start-End): Recip Deg Up/Down: - (kip) SPM: Stroke Length: Fluid Name: SPACER Fluids (1 of 2) Slurry Type. SPACER Purpose: SPACER Class: Description: MUD PUSH II Density: 12.00 (ppg) Yield. Mix Water Ratio: Excess: Mix Method: BATCH Sacks Used: Water Volume: Excess Slurry Volume: 0.0 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 30.0 (b61) Excess Measured From: Mud Type: Density: 8.50 (ppg) PV: 0.00 (cp) YP: 0.000 (IM/100ft-) Viscosity: 0.00 (s/qt) Gels 10 Sec: 0.000 (I0100T) Gels 10 Min: 0.000 (Ibf/100ft') Fluid Name: CEMENT Fluids (2 of 2) Slurry Type: CEMENT Purpose: PRIMARY Class: G-CLASS Description: TAIL SLURRY Density: 15.80 (ppg) Yield: 1.1700 ("Sk) Mix Water Ratio: 5.157 (gallsk94) Excess: 30.00(%) Mix Method: Sacks Used: 552.00 (9411b sacks) Water Volume: 67.8 (bbl) Excess Slurry Volume: 26.5 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 115.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 8.50 (ppg) PV: 0.00 (cp) YP: 0.000 Qbf/101)fn Viscosity: 0.00 (s/qt) Geis 10 Sec: 0.000 (Ibf/100ft-) Gels 10 Min: 0.000 (lbul00R.) Pnnted 6/13/2018 1:48:34PM Printed 6/132018 1:48:34PM North America - ALASKA - BP Page 2 or 3 Cementing Report Common Well Name: 11-23 / 03 FReport no.. 2 Report date: 5/17/2018 Project: PBU Project: PBU Site 11 11Event Spud DateRime: 7/11/1986 AFE No.: X3 -018Y4 -C: (2,588,604.00 ) I -S& Type: COM- ONSHORE (CON) Start Date 5/16/2018 Entl Oete: 520/2018 Contractor: PARKER DRILLING CO. RigName/No.. PARKER 272 Rig Release: 5/20/2018_ BPUOI: USA00001229 Active datum'. 11-238 Actual @74.60usft (above Mean Sea Level) AddSlvaa Name Type Amount Units Concentration Unit D047 ANTIFOAMAGENT 1.000 GAL/SX D206 ANTIFOAMAGENT 1.000 GAL/BBL D056 DISPERSANT 5.000 %BWOC D167 FLUID LOSS 2.000 %BWOC D600 G GAS -BLOCK 2.000 GAUSX D177 RETARDER 0.040 GAL/SX Fluid Tl e s Thick time Thick Free "ter Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Camp Comp Strength Comp Strength (hr) temp. (%) temp, (cc/30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) (°F) ("F) (psi) Time 1 Pressure 1 Tempereture 1 2 (psi) (°F) min (psi)'F (min) 4.62 0.00 80.00 28.0 165.00 1,000.001 1 Stages Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom plus Preesara Float pressure Retums Cmt Vol to Total Annular no. (usft) I (usrt) Rate (gpm) Press. (psi) Plug Plug I I dumped Bumped (psi) Hem Held (mini JCirCUIate Prior (hr) Surface (bbl) Mud Lost Flow (bbl) After I RIMARY CEMENT 10,441.00 15,155.00 y Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumped Disp. Rate TMD TMD Pmp date/time job Used temp temp. (bbl) Rate (bbl/min) (usR) (usH) (sof) bbVmin Printed 6/132018 1:48:34PM Printed 6/13/2018 1:48:34PM North America - ALASKA - BP Page 3 of 3 Cementing Report Canaan Wall Name: 11-23103 Report no, 2 Report tlate: 5/17/2078 Project: PBUSite: 11 Spud DateRime: 7H7/1886 Event Type: COM- ONSHORE (CON) Start Date: 5/16/201 B End Data: 5/20/2018AFE Contractor PARKER DRILLING CO. Rip Name/No.: PARKER 272 Rig Release: 5/20Y2018 X3 -018V4 -C: (2,588,804.00) BPUOI: USA00001229 Active datum: 11-238 Actual (M74.e0usft (above Mean Sea Level) Tab Casing Tat Shoe Test Liner Top Tot Tot Pressure: 3,600.00 (psi) FIT/LOT: (PPg) Liner Overlap: (usft) Time: 30 (min) Tool: N Positive Test: (Ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (Ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined: Bond Duality: TOC Sufficient: N CET Run: N Job Rating: Bond Duality: If Unsuccessful, Detection Indicator: Temp Surrey: N Remedial Cement Required: N Hos Poor to Log: (hr) How Determined: Printed 6/13/2018 1:48:34PM PTD R/$ — 0 i Loepp, Victoria T (DOA) From: Gorham, Bradley M <Bradley.Gorham@bp.com> Sent: Tuesday, April 10, 2018 9:37 AM To: Loepp, Victoria T (DOA) Subject: RE: PBU 11-23B (PTD 218-029) - LOT to FIT Follow Up Flag: Follow up Flag Status: Flagged Thanks Victoria, apologies for the confusion. Brad Gorham BP Exploration (Alaska), Inc. Drilling Engineer W: (907)564-4649 C:(907)223-9529 Bradley.Gorham@bp.com From: Loepp, Victoria T (DOA)[mailto:victoria.loepp@alaska.gov] Sent: Tuesday, April 10, 2018 7:36 AM To: Gorham, Bradley M <Bradley.Gorham@bp.com> Cc: Lastufka, Joseph N <Joseph. Lastufka@ bp.com>; Davies, Stephen F (DOA) <steve.davies@alaska.gov> Subject: RE: PBU 11-23B (PTD 218-029) - LOT to FIT Brad, Approval is granted to conduct an FIT to 12.6 ppg EMW when drilling out of the 9-5/8" instead of performing an LOT as was approved in the PTD. This will provide at least a 25 bbl kick tolerance according to your calculations. Please include this approval with the approved PTD. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loepp(cbalaska.goy CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria. Loeop4alaska.aov From: Loepp, Victoria T (DOA) Sent: Tuesday, April 10, 2018 7:14 AM To: Gorham, Bradley M (Brad lev.Gorham Ca) bp.com) <Bradley.Gorham@bp.com> Cc: Lastufka, Joseph N (Joseph.Lastufka@bp.com) <Joseph.Lastufka@bp. com>; Davies, Stephen F (DOA) <steve.davies@alaska.Rov> Subject: FW: PBU 11-23B (PTD 218-029) - LOT to FIT Brad, As you know, this PTD has been approved and returned. The approved permit was for PBU 11-23B(PTD 218-029)(both the well name and PTD # you referenced below were incorrect). I'm not sure why this request was sent to Steve; this question certainly could have been addressed sooner with the correct routing. I will verify your calculations this morning and let you know. Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. LoeppRa laska.a ov CONFIDENTIALfrY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria Loepo@alaska.aov From: Davies, Stephen F (DOA) Sent: Monday, April 09, 2018 1:47 PM To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.eov> Cc: Schwartz, Guy L (DOA) <euy.schwartz@alaska.gov>; Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov> Subject: FW: PBU 11-23 (PTD 218-092) - LOT to FIT Sorry, I overlooked Brad's request, below. Should have passed it along to you all a long time ago. Would you mind sending Brad an email discussing the correct action to take with a CC to me? Thanks, Steve D. CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve davies@alaska.gov. From: Gorham, Bradley M [ma iIto: Brad ley.Gorham@bp.com] Sent: Monday, April 9, 2018 1:35 PM To: Davies, Stephen F (DOA) <steve.davies@alaska.f;ov> Subject: PBU 11-23 (PTD 218-092) - LOT to FIT Steve, Have you had a chance to review the request below? We are working to finish the well program and would like to have this finalized one way or another. Don't hesitate to contact me if you have any questions or concerns. Thanks, Brad Brad Gorham BP Exploration (Alaska), Inc. Drilling Engineer W: (907)564-4649 C:(907)223-9529 Brad Iey.Gorham(@bp.com From: Gorham, Bradley M Sent: Thursday, March 29, 2018 8:18 AM To: Davies, Stephen F (DOA) <steve davies@alaska.Qov> Subject: PBU 11-23 (PTD 218-092) - LOT to FIT Steve, I am not sure where you are in the approval process of the 11-23B but I wanted to update you with a proposed change. Due to the fact the 9-5/8" casing is uncemented at the planned kick off point, there is potential to induce wellbore breathing in the CM formation when conducting the LOT. We would like to change the planned LOT to an FIT. To obtain a 25 bbl kick tolerance, assuming 10.3 ppg mudweight at the intermediate TD interval we need to achieve at least a 12.1 ppg EMW. We will target a FIT value of 12.6 ppg EMW, which will provide us a 25 bbl kick tolerance if we had 10.8 ppg EMW at TD. Although it is highly unlikely that it will be necessary to increase the mudweight above the planned 10.3 ppg, we wanted to apply a safety factor to ensure we are covered if that scenario were to occur. Please let us know is this change is acceptable and if you have any questions or concerns. Thanks, Brad Brad Gorham BP Exploration (Alaska), Inc. Drilling Engineer W:(907)564-4649 C: (907)223-9529 Bradley.Gorham(@bp.com THE STATE °fALASKA GOVERNOR BILL WALKER Kenneth W. Allen Engineering Team Lead BP Exploration (Alaska) Inc. P.O Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.closka.gov Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 11-23B BP Exploration (Alaska) Inc. Permit to Drill Number: 218-029 Surface Location: 1096' FSL, 364' FEL, Sec. 28, T1 IN, RI 5E, UM Bottomhole Location: 5256' FSL, 4229' FEL, Sec. 21, TI IN, R15E, UM Dear Mr. Allen: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French k Chair DATED this 2-8 day of March, 2018. STATE OF ALASKA '.ASKA OIL AND GAS CONSERVATION COMMIS: PERMIT TO DRILL 20 AAC 25.005 it 1C t:1VCL! MAR 13 2018 1a. Typeof Work: (',�(� � 1b. Proposed Well Class: Exploratory -Gas ❑ Service - WAG ❑ Service -Disp❑ for: ic. Sbsd Drill ❑ Lateral ❑ Stretigrephic Test ❑ Development - Oil 0. Service - Wnj ❑ Single Zone 0 Coal iGa ./❑i-7Gas���---Illy rates ❑ Gf S'� li tl Reddll 21. Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket 0 • Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 295105380. PBU 11-2313 - 3 Address: 8. Proposed Depth: 12. Field/Pool (s ): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 15252'- TVD: 8619' PRUDHOE BAY, PRUDHOE OIL 4a. Location of WellGovernmental Section). ( ) 7rtp . Propeyesignation (Lease Number): ADL 026325 8 028322 - Surface: 1096' FSL, 364' FEL, Sec 28, T71N, R15E, UM ' S. DNR Approval Number: 13. Approximate spud date: Top of Productive Horizon: 1214' FSL, 2897' FEL, Sec.21, TI IN, R15E, UM 70-054 April 10, 2018 F_ /s�s'zik a Total Depth: 5258' FSL, 4229 Sec. 21, T11N, R15E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property'. 36000 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KS Elevation above MSL: 74.15 -feet15. Distance to Nearest Well Open Surface x- 707156 • y- 5952811' Zone - ASP 4 GL Elevation above MSL: 27.20. feet to Same Pool: 750 16. Deviated wells: Kickoff Depth: 6450 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 108 degrees Downhole: 3284 • Surface: 2457 " 18, Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casino Weiahl I Grade Coupling Len th MD I TVD NID TVD (including sta a data 8-1/2"x9-7 7,. 26# L-80 VamTop HC 4336' 6300' 4819' 10636' 8324' 482 sx Class'G' 6-1/8" 4-1/2" 12.6# I3Cr85 VannTo 4766' 10486' 8195' 15252' 8619' 529 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Reddll and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (191): Junk (measured): 13344 8702 11016 11016 8585 None Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20" 1450#Poleset 35-115 35-115 Surface 2733 733/8' 3200 Sur CS III, 900 sx CS II 35-2768 35-2500 Intermediate 7147 9-5/8" 500 sx Class'G', 300 sx CS 1 33-7180 33-5330 Liner 5057 7" 400 sx Class'G' 6996-12053 5220-8758 Liner See Attac See Attachment See Attachment See Attachment Perforation Depth MD (it): 11126 - 13333 Perforation Depth TVD (ft): 8661-8703 Hydraulic Fracture planned? Yes ❑ No 0 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Gomam, Bradlev M from without prior written approval. Authorized Name Allen, Kenneth W Contact Email Bradley.GomamL�bp.com Authorized Title Engineering Team Lead Contact Phone 907-564-4649 Authorized Signature Date 12hV Commission usia Only Permit to Drill _ Number: ��� API: 50- 029-21610-02-00 Permit Approval- Date: See cover letter for other requirements: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbedmeth ne, gas hydrates, or gas contained in shales: ❑7 Other' 06P ffS f to 35_00P51' Samples req'd: Yes ❑ , No Mud log req'd: Yes ❑ , No /J/7o Lll a,r�Cp i 2' ve-, / tYr H2S measures Yes f/ NO ❑0 Directional Svy req'd: Yes 0/ No ❑/ f0 , - 7 U a �75 t y Spacing excephon req'd: Yes ❑ No L Inclination -only svy req'tl: Yes ❑ No t'J Post initial injection MIT req'd: Yes ❑ No L9� APPROVED BY Approved by: COMMISSIONER THECOMMISSION Date: 3 Zr,I( 1/7Z- 4#1110-401 /TL 1/23�/Sn^` R� �II ��-11 I N � I � L //o J,� �- " #110-401 Revised 5/2017 This permit Is valid .0 aL iWFnlhk tl5t! o#Lval (20 AAC 25.005(g)) �/ - Submit Ff� and 3 �/ Attachments in Duplicate To: Alaska Oil & Gas Conservation Commission From: Brad Gorham, ODE Date: March 12, 2018 RE: 11-23B Permit to Drill The 11-23B well is scheduled to be drilled by Parker 272 in April 2018. This rotary sidetrack is a horizontal producer targeting the Zone 1 Ivishak Sands. The planned well is a two string, ultra- slimhole design using a 9-5/8" surface casing, 7" intermediate casing, and 4-1/2" production liner. The intermediate casing will be set at the top of the Ivishak, and the production interval will be completed with a cemented and perforated liner. The maximum anticipated surface pressure from the Ivishak with a full column of gas from TD to surface is 2,457 psi (assumes 7.64 ppg EMW most likely pore pressure and a 0.1 psi/ft gas gradient). The well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3 rams and an annular). The BOP rams and annular will be tested to 3,500 psi. A detailed operations summary is included with the permit application. If there are any questions concerning information on 11-23B, please do not hesitate to use the contact information below. Brad Gorham Office: (907) 564-4649 Attachments: Well Bore Schematic Proposed Pre -Rig Schematic Proposed Completion Directional Package Cell: (907) 223-9529 Email: Bradlev.Gorham(ftp com BOPE Schematic Well Head Schematic Tree Schematic 11-23B PTD 1 3/12/2018 Planned Well Summary Well 11-23B vele Producer Ob rge t Ivishak Current Status Rotary Sidetrack Estimated Start Date: 4/10/2018 Time to Complete: 26.0 Da s Surface Northing Easting I Offsets TRS Location 5952810.85 707155.97 -1 4183.1' FNL / 364.2' FEL 11N 15E Sec 28 Planned KOP: 6,450' MD Planned TD: I 15,252' MD / 8,545' TVDss Rig: Parker 272 GL -RT: 46.95 • RTE ref MSL : 74.15 ' Directional - Baker wo08 KOP: 6,450' MD Northin Eastin TVDss Offsets TRS Tgt ICP 5958137 704464 8,250' 4' FNL / 2896.9 4065.FEL 11 N 15E Sec 21 Tgt TO 5962140 703012 8,545' 24.4' F 4 11 N 15E Sec 21 FEL4229 Planned KOP: 6,450' MD Planned TD: I 15,252' MD / 8,545' TVDss Rig: Parker 272 GL -RT: 46.95 • RTE ref MSL : 74.15 ' Directional - Baker wo08 KOP: 6,450' MD Maximum Hole Angle: "55° in the first intermediate section -108 in the production section Close Approach Wells: 11-30A and L2 -08A Survey Program: Reference attached directional program Nearest Property Line: -36,000' Nearest Well within Pool: -150' 11-23B PTD 2 3/12/2018 Formation Tops and Pore Pressure Estimate (SOR) Formation Estimated Formation Top TVDss) Most Likely Pore Pressure (EMW Fluid Type (for sands) SV1 4,297 8.4 water UG4 4,826 9.5 water UG3 5,035 9.5 water UG1 5,740 9.5 water WS2 6,275 9.3 water CM3 6,700 9.7 Shale CM2 7,150 9.8 Shale CMl 7,683 10 Shale THRZ 8,045 10 Shale LCU/TSHU 8,249 7.65 gas TSAD 8,265 7.64 gas TCGL 8,400 7.55 gas GWC(GCWI) 8,425 7.53 GCWI 8CGL 8,445 7.24 GCWI 24N/GWC 8,525 7.25 shale 24P 8,533 7.46 gas 23N 8,558 7.44 Shale 22P 8,595 7.42 shale PGOC 8,645 7.29 gas 7000 8,645 7.29 Oil TDF 8,675 7.29 Oil BSAD/Kavik 8,709 7.29 shale 11-23B PTD 3 3/12/2018 Casing/Tubing Program Hole Size Liner/ WUFt Grade Conn Length Top Bottom 1 NA TbgO.D. 9,400' MD — 10,636MD 1 10.3-11.0-1 10-15 1 20-30 1 <5 1 <10 <20 8.5-9.5 MID /TVDss MD/TVOss 8-1/2" x9- 7" 26# L-80 VamTop HC 4,336' 6.300'/4,744- 10,636' 18,250' 7/8" 150' lap) 6-1/8" 4 Yz" 12.6# 13Cr-85 Vam Top 4,766' 10,486'/ 8,121' 15,252' / 8,545' (150' lap) Tubing 4%" 12.6# 13Cr-85 VamTop 10,491' Surface 10,491'/8,123' —5' into liner TBS Mud Program Intermediate Mud Properties: LSND 8-1/2" x 9-7/8" Hole Section Depth Interval Density PV (cp) lb/100tt= API FL HTHP FL MBT pH 6,450' MD — 9,400' MD 9..8-10,3-1 10-15 20-30 1 <8 1 NA <20 8.5 - 9.5 9,400' MD — 10,636MD 1 10.3-11.0-1 10-15 1 20-30 1 <5 1 <10 <20 8.5-9.5 Production Mud Pro ernes: Water Based Polymer Fluid 6-1/8" Hole Section Depth Intervalensity PV (cp) YP API FL HTHP FL MBT pH Ib/10 10,636' MD - TD e,.5-9.0 <8 12-20 <12 NA <4 1 8.;—Qq Logging Program 8-1/2 x 9-7/8 Sample Catchers — as required by Geology Intermediate Drillin Dir/GR/RES Oen Hole: None Cased Hole: I None 6-1/8" Production I Sample Catchers—as r uired by Geo Drillin Dir/GR/RES/NEU 1 "•Z/i° O en Hole: None ' Cased Hole: I None 11-23B PTD 4 3/12/2018 Cement Program Casing Size 7" 26# L-80 amTop HC Intermediate Casin Lead N/A Basis Lead TOC N/A Tail Oen hole volume + 40% excess + 80 ft shoe track Tail TOC 1 500 ft MD above casing shoe Spacer -30 bbls of ViscosifiedSpacer weighted to -12.0 Mud Push II Total Cement Lead N/A Volume Tail 99 bbls, 559 cuft, 482 sks of 15.8 lb/gal, Yield: 1.16 cuft/sk Temp BHST 171° F Casing Size 4-1/2" 12.6# 13CR-80 VAM TOP Production Liner Lead N/A Basis Lead TOC NIA Tail Oen hole volume + 30% excess + 80 ft shoe track + 200'4" DP x 7" LNR annulus Tail TOC Top of liner Spacer -30 bbls of Viscosified Spacer weighted to -12 Mud Push II Total Cement Lead N/A Volume Tail 109 bbls, 614 cult, 529 sks 15.8 Ib/gal Class G -1.17 cuft/sk Contin nc : 8.61b/ al BiModal lightweight cement in event of high lost circulation Tem BHST 174° F Surface and Anti -Collision Issues Surface Close Proximity: No wells will be affected by the Parker 272 rig shadow. Sub -Surface Pressure Management: No pressure management required. Anti -Collision: All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan criteria: • L2 -08A: Shut-in at surface prior to drilling production interval • 11-30A: Shut-in at surface with tubing tail plug prior to milling the window ✓ Offset well ownership information All offset wells identified within 200 ft of the proposed wellbore are operated by BP. 11-23B PTD 5 3/12/2018 Hydrogen Sulfide DS -11 is considered an H2S site. Recent H2S data from the pad is as follows: Faults There are no planned fault crossings. Drilling Waste Disposal There is no annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB Environmental Advisors (659-5893) for guidance. 11-23B PTD 6 3/12/2018 Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level 11-23A 24 03/28/2013 #2 Closest SHL Well H2S Level 11-09A 10 05/01/2017 #1 Closest BHL Well H2S Level 11-30A 7 01/08/2017 #2 Closest BHL Well H2S Level 11-27 15 02/19/2017 #3 Closest BHL Well H2S Level 11-39 10 08/22/2017 #4 Closest BHL Well H2S Level 11-09 10 05/01/2017 Max Recorded H2S on Pad/Facility 03-29 650 - 02/10/2016 Faults There are no planned fault crossings. Drilling Waste Disposal There is no annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB Environmental Advisors (659-5893) for guidance. 11-23B PTD 6 3/12/2018 Well Control The 8-1/2" x 9-7/8" hole and 6-1/8" hole sections will be drilled with well control equipment consisting of 5,000 psi working pressure rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP test frequency for 11-23B will be 14 days with function test every 7 days. Except in the event of a significant operational issue that may affect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. 8-1/2" x 9-7/8" Intermediate Interval Maximum anticipated BHP 3,284 psi at the TSAD at 8,265' TVDss 7.6 ppq EMW Maximum surface pressure 2,457 psi at the TSAD 0.10 psitft gas gradient to surface Kick tolerance 25 bblswith 12.1 ppg frac gradient. Kick tolerance Assumes 7.8 ppg pore pressure in the TSAD + 0.5 ppg kick In rit Test — 6-1/8" hole intensitv and 10.3 MW. Planned BOP test pressure Rams test to 3,500 psi / 250 psi. Planned completion Fluids Annular test to 3,500 psi / 250 psi Integrity Test — 8-1/2" x 9- 7/8" hole LOT after drilling 20'-50' of new hole 7" Casing Test 3,500 psi surface pressure 6-1/8" Production Interval Maximum anticipated BHP 3,284 psi at the TSAD at 8,265' TVDss 7.6 ppq EM Maximum surface pressure 2,457 psi at the TSAD 0.10psi/ft gas -gradient to surface Kick tolerance Infinite with >9.6 ppg frac gradient. Assumes an 7.64 ppg max pore pressure in the LSB + 0.5 ppg - kick intensity and 8.6 ppg MW. Planned BOP test pressure Rams test to 3,500 psi / 250 psi. Annular test to 3,500 psi / 250 psi In rit Test — 6-1/8" hole FIT after drilling20'-50' of new hole 4. oLPacker iner Top 3,500 si surface pressure Planned completion Fluids 8,5 ppg seawater / 2,200 ft diesel to 1,866 ft TVDss 11-23B PTD 7 3/12/2018 Drill and Complete Operations Summary Pre -rig Work 1. PPPOT-T and PPPOT-IC. Function LDS 2. MIT -T to 3,500 psi. 3. Pull through tubing packer (TTP). Flush control lines. 4. Perform injectivity test. 5. Perform fullbore P&A. Planned top of cement at 11,038' MD. 6. Brush BPV profile. Drift and tag top of cement. Pull GLV and peform MTT log 7. MIT -T to 3,500 psi 8. Circulate second cement plug. Planned TOC at 6,800' MD. 9. Brush BPV profile. Drift and tag top of cement. Drift for jet cut. 10. CMIT-TxIA. Inflow test. Perform OA integrity tests. 11. Jet cut tubing at -6,500' MD. 12. CMIT-TxIA 13. Set TWC. Install dry hole tree and configure annular valves Proposed Drilling Operations 1. MIRU Parker272. 2. Test TWC from below to 3,500 psi psi for 5 minutes. 3. Nipple down tree and nipple up BOPE and test to 3,500 psi. (Configured from top to bottom: 13-5/8" annular preventer 4-1/2" x 7" VBRs in the upper cavity, blind/shear rams, mud cross and 2-7/8" x 5" VBRs in the lower cavity). a. Test 4-1/2" x 7" VBR's with 5" test joint. b. Test 2-7/8" x 5" VBR's with a 4" and 5" test joints. c. Test annular to 250 psi / 3,500 psi with 2-7/8" and 5" test joint. d. Notify AOGCC 24 hrs in advance of full test. 4. Rig up lubricator and pressure test. 5. Pull TWC with pressure tested lubricator. 6. RU hard lines to BOP. Circulate out diesel freeze protection and displace well to clean seawater. 7. Pull 4-112" tubing from the pre -rig cut. 8. Perform 9-5/8" cleanout run to tubing stub. Perform only if deemed necessary. 9. PU 9-5/8" whipstock, bottom trip anchor, and 8-1/2" window milling assembly (to include full gauge string mills). RIH to top of tubing stub, orient, and set whipstock. TOWS at 6,433' MD. 10. Swap wellbore over to LSND milling fluid. --------------------- End of Sundry - Beginning of Permit to Drill ------------------ Drill 8-1/2" x 9-7/8" Intermediate HoleTbbkick 11. Mill window in 9-5/8" casing plus 20' of new formation. 12. Pull into the window and perform LOT. Minimum LOT required is 12.1 ppg EMW for 2 / tolerance. 13. POOH for drilling BHA. 14. MU 8-1/2" drilling motor BHA w/ MWD/GR/RES/PWD and RIH. 15. Kick off and drill 8-1/2" intermediate interval until set up for underreamer assembly. 16. POOH and lay down motor assembly. 17. Pick up BHA #2, underreamer assembly w/ MWD/GR/RES/PWD and drill to the directional plan to TSAG, TD of -10,636' MD. 11-23B PTD 8 3/12/2018 18. At TD, CBU a minimum of 2x, or until wellbore is clean. 19. POOH on elevators and lay down BHA. Run & Cement 7" Intermediate Liner 20. Run 7", 26# L-80, VamTop HC liner to TD, with 150' liner lap into 9-5/8" window. Ch d C'rw r" f 21. Cement liner with 15.8 ppg Class G tail cement to bring cement 1,500' MD above TSAG. J 6 / i'S!// t51-- , J 22. Set liner top packer and liner hanger. POOH and LD liner running tool. to I -r,& C C 23. Change upper 4-1/2" x 7" casing rams to 2-7/8" x 5" VBRs and test to 250 psi low / 3,500 psi high for 5 min each. 24. Test 7" liner to 250 psi low for 5 min / 3,500 psi high for 30 min after cement has reached a minimum 500 psi compressive strength. Drill 6-1/8" Production Hole Section 25. MU 6-1/8" drilling BHA with MWD/GR/RES/DEN/NEU and RIH. 26. RIH and tag landing collar. 27. Displace wellbore to 8.6 ppg QuikDril-N. 28. Perform an extended flow check on 7" liner (no flow test). 29. Drill shoe track and 20 ft of new formation. Pull above shoe and perform FIT. Minimum FIT required is 9.6 ppg EMW for infinite kick tolerance. However, a higher EMW will be targeted based on planned ECD's. 30. Drill 6-1/8" production interval per the directional plan to TD of -15,252' MD. 31. At TD, CBU until wellbore is clean. 32. Perform short trip to the shoe if deemed necessary. 33. RIH to TD, circulate the wellbore clean and POOH on elevators. 34. LD excess 4" DP and BHA. Run and cement 4-1/2" Production Liner 35. Run 4-1/2", 12.6 ppf, 13Cr-85, VamTop production liner to TD, with 150 ft liner lap into 7" casing. 36. Cement production liner with 15.8 Class G cement. Note: If losses are present then the 8.6 ppg lightweight slurry will be utilized. 37. Set liner hanger and liner top packer (WFT). Circulate out the excess cement off the top of liner. 38. Displace wellbore to clean seawater. 39. POOH and LD liner running tool. 40. Pressure test 9-5/8" casing x 7" liner x 4-1/2" liner envelop to 250 psi low for 5 min / 3,500 psi high for 30 min. Wait for cement to reach 500 psi prior to conducting pressure test. 41. RU and run perf guns as per TCP. Space out and shoot -2,200' of perforations. 42. POOH while keeping the hole full of sea water Run 4-1/2" Completion 43. RU and run 4-1/2", 12.6# 13Cr-85 VamTop completion per the tally. Tag up in PBR, space out, and land tubing hanger. RILDS. 44. Displace tubing and IA to clean seawater. 45. Reverse circulate in heated seawater and inhibited seawater to IA and tubing (surface to surface). 46. Drop ball & rod and set production packer. Individually test tubing and IA to 250 psi low for 5 min / 3,500 psi high for 30 min. 11-23B PTD 9 3/12/2018 47. Hold pressure on the IA and slowly bleed tubing pressure down to 1,500 psi to shear the DCR valve. Pump both ways to confirm circulation ability. 48. Reverse circulate in diesel freeze protect down IA using rig's injection pump to freeze protect IA and tubing to 200' below base permafrost. 49. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm well is dead. ND/NU 50. Install TWC and test from above and below to 250 psi low / 3,500 psi high for 5 minutes each. 51. N/D BOPE. NU adapter flange and double master valves. Test to 250 psi / 4,500 psi for 5 minutes each with diesel. 52. Ensure Heat is left on top of TWC and only diesel is left in the tree. 53. Install all annulus valves and secure the well. 54. Rig down Parker 272. 55. Move rig off location. Post -Rig Operations 1. V: tree work/Pull TWC 2. SL: Pull B&R, Set DGLVs 3. C: Set downhole choke 4. T: Flowback 11-23B PTD 10 3/12/2018 11-23B Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures A. Intermediate Hole: The UG4 is expected to be a 9.5 ppg EMW. The CMI, CM2 and CM3 are expected to be 9.7 — 10.0 ppg EMW. Formation pressures will be controlled with a 9.8 — 10.3 ppg mud to drill to within 200' MD of the CM1. At this point, there will be a weight up to 10.3 — 11.0 ppg to drill the rest of the interval to TD. B. Production Hole: The Ivishak is expected to be at a 7.6 ppg EMW. Reservoir pressures will be controlled by using 8.5 — 9.0 ppg water based mud. II. Lost Circulation/Breathing A. Intermediate Hole: There are no expected fault crossings in the first intermediate hole. However, breathing has been known to occur in the Colville on other Drill Sites in Prudhoe Bay as a result of high ECD's. B. Production Hole: There are no planned fault crossing in the production interval so the lost circulation risk is low. III. Fault Locations There are no planned fault crossings. IV. Integrity Testing Test Point Test De th Testtype EMW Ib! al 9-5/8" Window 20'-50' from the 9-5/8" window LOT 12.1 ppg 7° shoe I 20'-50' from the 7" shoe FIT 9.6 ppg V. Hydrogen Sulfide DS -11 is considered an H2S site. Recent H2S data from the pad is as follows: VI. Anti -Collision Issues All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan criteria: • L2 -08A: Shut-in at surface prior to drilling production interval • 11-30A: Shut-in at surface with tubing tail plug prior to milling the window CONSULT THE DS -11 DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. 11-23B PTD 11 3/12/2018 Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level 11-23A 24 03/28/2013 #2 Closest SHL Well F12S Level 11-09A 10 05/01/2017 #1 Closest BHL Well H2S Level 11-30A 7 01/08/2017 #2 Closest BHL Well H2S Level 11-27 15 02/19/2017 #3 Closest BHL Well H2S Level 11-39 10 08/22/2017 #4 Closest BHL Well H2S Level 11-09 10 05/01/2017 Max Recorded H2S on Pad/Facility 1 03-29 650 02/10/2016 VI. Anti -Collision Issues All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan criteria: • L2 -08A: Shut-in at surface prior to drilling production interval • 11-30A: Shut-in at surface with tubing tail plug prior to milling the window CONSULT THE DS -11 DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. 11-23B PTD 11 3/12/2018 � e by North America - ALASKA - BP Prudhoe Bay PB DS 11 11-23 PLAN 11-23B Pian: 11-23B WP08 BP Well Plan Survey Report 15 February, 2018 BAIGIHES T 1 aGEcompany s by Company: North Americe- ALASKA -BP Project: Prudhoe Bay Site: PB DS 11 Well: 11-23 Wellbore: PLAN 11-23B Design: 11-23B WPOB BP BAT BA, �(ER BP Well Plan Survey Report Northing: From: GEmmp ny Local Co-ordinate Reference: Well 11-23 TVD Reference: 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) MD Reference: 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK (4267'15864) Using Well Reference Point Map Zone: NAD27 ° OGP-Usa AK /Alaska zone 4 [26734.1586, Using geodeec scale factor Site PB DS 11, TR -11-15 Site Position: Northing: From: Map Earning: Position Uncertainty: 0.00 usft Slot Radius: Well 11-23 Well Position -NI-S 0.00 usft Northing: +EI -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore PLAN 11-23B Magnetics Model Name Sample Date Declination 1°) BGGM2017 5/1/2018 17.46 Design 11-238 WP08 Audit Notes: Version: Vertical Section: 5,949,527.780 usft Latitude: 70° 15' 55.850 N 707,585.650 usft Longitude: 148° 19' 17.134 W 0.000 in Grid Convergence: 1.58 ° 5,952,810.850 usft • Latitude: 70° 16'28.245 N 707,155.970 usft Longitude: 148° 19'27.005 W 28.45 usft Ground Level: ° 27.20usft Dip Angle Field Strength 1°I (nT) 80.98 57,473 I Phase: PLAN Tie On Depth: 6,114.15 Depth From (TVD) -NI-S +E/ -W Direction (usft) (usft) (usft) (°) 45.70 0.00 0.00 337.64 2/152018 11:40:02AM Page 2 COMPASS 5000.1 Build 81D BP , ER kw �� BP Well Plan Survey Report BAF�UGHES GE Q�pany Company: North America - ALASKA - BP Well 11-23 TVD Reference: Project: Prudhoe Bay MD Reference: 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) Site: PB DS 11 True Survey Calculation Method: Well: 11-23 Database: EDM RSK - Alaska PROD - ANCP1 Wellbore: PLAN 11-23B r) 3,22049 Design: 11-23B WP08 5,956,001.584 706,037.089 Survey Tool Program Date 2/15/2018 0.00 0.00 From To -1,141.46 5,956,246.967 (usft) Will Survey (Wellbore) Tool Name 117.15 598.15 Sperry Boss Gyro MS WRP 57.0' Copy (11 BOSS -GYRO 598.15 6,114.15 MWD (11-23) 5,956,258.542 MWD 6,114.15 6,450.00 11-23B WP08 (PLAN 11-23B) 12.50 MWD 6,450.00 6,880.00 11-23B WPO8 (PLAN 11-23B) 3,495.29 BLIND 6,880.00 10,636.00 11-23B WPOB (PLAN 11-23B) - MWD 6,880.00 10,636.00 11-23B WP08 (PLAN 11-23B) 0.00 MWD+IFR+MS-WOCA 10,636.00 15,252.34 11-23B WP08 (PLAN 11-23B) -1159,94 MWD 10,638.00 15,252.34 11-238 WP08 (PLAN 11-23B) MWD+IFR+MS-WOCA Planned Survey 3,575.91 -1,19719 MD Inc Azi TVD TVDSS lush) V) (1) hush) (usft) 6,114.15 53.50 336.80 4708.89 4,634.74 TIP 3.00 6,450.00 54.75 335.16 4,905.71 4,831.56 KOP 5,956,464.873 705,793.190 6,466.00 54.77 332.71 4,914.94 4,840.79 Start 20.00 hold at 6466.00 MD 6,486.00 54.77 332.71 4,926.48 4,852.33 Start DLS 3.00 TFO -184.77 6,500.00 54.37 332.58 4,934.59 4,860.44 6,600.00 51.48 331.56 4,994.87 4,920.72 6,700.00 48.60 330.47 5,059.09 4,984.94 6,774.15 46.47 329.59 5,109.15 5,035.00 UG3 Local Co-ordinate Reference: Well 11-23 TVD Reference: 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) MD Reference: 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM RSK - Alaska PROD - ANCP1 Description Sperry -Sun BOSS gyro multishot MWD - Standard MWD - Standard Blind drilling MWD - Standard MWD + IFR + Multi Station W/O Crustal MWD - Standard MWD + IFR + Multi Station W/O Crustal NIS EIW Northing Easting DLeg TFace (usft) (usft) (usft) (usft) (°/100usft) r) 3,22049 -1,030.67 5,956,001.584 706,037.089 0.00 0.00 3,489.03 -1,141.46 5,956,246.967 705,919.499 0.54 -46.30 3,480.77 -1,147.20 5,956,258.542 705,913.437 12.50 -90.00 3,495.29 -1,154.69 5,956,272.849 705,905.551 0.00 0.00 3,505.42 -1159,94 5,956,282.832 705,900.032 3.00 -164.77 3,575.91 -1,19719 5,956,352.262 705,860.753 3.00 -164.70 3,642.96 -1,234A1 5,956,418.259 705,821.801 3.00 -164.09 3,690.34 -126173 5,956,464.873 705,793.190 3.00 -163.38 2/752018 11:40:02AM Page 3 COMPASS 50001 Build 81D by BP BATHER ; BP Well Plan Survey Report UGI�ES ce°omnaw Company: North America - ALASKA - BP Pro)ect Prudhoe Bay Site: PB DS 11 Well: 11-23 Reference: Wellbore PLAN 11-238 Design: 11-236 WP08 Planned Survey MD Inc (usft) 6,800.00 45.73 6,900.00 42.88 7,000.00 40.04 7,100.00 37.22 7,200.00 34.43 7,255.00 32.91 Start 2966.16 hold at 7266.00 MD 7,300.00 32.91 7,400.00 32.91 7,500.00 32.91 7,600.00 32.91 7,654.77 32.91 UGI 7,700.00 32.91 7,800.00 32.91 7,900.00 32.91 8,000.00 32.91 8,100.00 32.91 8,200.00 32.91 8,292.03 32.91 WS2 8,300.00 32.91 8,400.00 32.91 8,500.00 32.91 8,600.00 32.91 8,700.00 32.91 211512018 11:40.02AM Page 4 COMPASS 5000.1 Build 81D Local Co-ordinate Reference: Well 11-23 TVD Reference: 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) MD Reference: 11-23B Plan RKB Ca? 74.15usft (11-23B Plan RKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Azi TVD TVDSS NIS EIW Northing Easting DLe9 TFace (°) (usft( (usft) (usft) (usft) (usft) (usft) (°/IOOusft) (°( 329.27 5,127.07 5,052.92 3,706.38 -1,271.20 5,956,480.643 705,783.280 3.00 -162.79 327.95 5,198.63 5,124.46 3,766.01 -1,307.56 5,956,539.242 705,745.297 3.00 -162.57 326.48 5,273.57 5,199.42 3,821.57 -1,343.39 5,956,593.896 705,707.955 3.00 -161.62 324.83 5,351.68 5,277.53 3,873.22 -1,378.58 5,956,644.455 705,671.358 3.00 -160.52 322.95 5,432.76 5,358.61 3,920.52 -1,413.04 5,956,690.781 705,635.606 3.00 -159.23 321.79 5,478.53 5,404.38 3,944.67 -1,431.66 5,956,714.410 705,616.336 3.00 -157.70 321.79 5,516.31 5,442.16 3,963.88 -1,446.78 5,956,733.196 705,600.693 0.00 0.00 321.79 5,600.26 5,526.11 4,006.57 -1,480.38 5,956,774.945 705,565.929 0.00 0.00 321.79 5,684.22 5,610.07 4,049.26 -1,513.98 5,956,816.694 705,531.165 0.00 0.00 321.79 5,768.17 5,694.02 4,091.96 -1,547.59 5,956,858.442 705,496.400 0.00 0.00 321.79 5,614.15 5,740.00 4,115.34 -1,565.99 5,956,881.307 705,477.361 0.00 0.00 321.79 5,852.12 5,777.97 4,134.65 -1,581.19 5,956,900.191 705,461.636 0.00 0.00 321.79 5,936.08 5,861.93 4,177.34 -1,614.80 5,956,941.940 705,426.871 0.00 0.00 321.79 6,020.03 5,945.88 4,220.03 -1,648.40 5,956,983.689 705,392.107 0.00 0.00 321.79 6,103.98 6,029.83 4,262.73 -1,682.00 5,957,025.438 705,357.343 0.00 0.00 321.79 6,187.94 6,113.79 4,305.42 -1,715.61 5,957,067.186 705,322.578 0.00 0.00 321.79 6,271.89 6,197.74 4,348.11 -1,749.21 5,957,108.935 705,287.814 0.00 0.00 321.79 6,349.15 6,275.00 4,387.40 -1,780.13 5,957,147.355 705,255.822 0.00 0.00 321.79 6,355.84 6,281.69 4,390.80 -1,782.81 5,957,150.684 705,253.049 0.00 0.00 321.79 6,439.80 6,365.65 4,433.49 -1,816.42 5,957,192.433 705,218.285 0.00 0.00 321.79 6,523.75 6,449.60 4,476.19 -1,1150.02 5,957,234.181 705,183.521 0.00 0.00 321.79 6,607.70 6,533.55 4,518.88 -1,883.62 5,957,275.930 705,148.756 0.00 goo 321.79 6,691.66 6,617.51 4,561.57 -1,917.23 5,957,317.679 705,113.992 0.00 0.00 211512018 11:40.02AM Page 4 COMPASS 5000.1 Build 81D BP BA�UG bp BP Well Plan Survey Report (ER E,. p,, Company: North America -ALASKA - BP Project Prudhoe Bay SRO: PB DS 11 Well: 11-23 Wellbore: PLAN 11-23B Design: 11-23B WPO8 Planned Survey MD Inc (usft) (°) 8,798.26 32.91 CM3 8,800.00 32.91 8,900.00 32.91 9,000.00 32.91 9,100.00 32.91 9,200.00 32.91 9,300.00 32.91 9,334.27 32.91 CM2 9,400.00 32.91 9,500.00 32.91 9,600.00 32.91 9,700.00 32.91 9,800.00 32.91 9,900.00 32.91 9,969.15 32.91 CM1 10,000.00 32.91 10,100.00 32.91 10,200.00 32.91 10,221.16 32.91 Start OLS 3.00 TFO 122.54 10,300.00 31.69 10,385.67 30.50 Start 250.00 hold at 10385.67 MD 10,39775 30.50 THRZ 321.79 7,783.05 7,708.90 5,116.57 Local Coordinate Reference: Well 11-23 704,662.055 0.00 0.00 321.79 7,867.01 7,792.86 TVD Reference: -2,387.68 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) 0.00 0.00 321.79 7,950.96 7,876.81 MD Reference: -2,421.28 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) 0.00 0.00 321.79 7,968.72 7,894.57 North Reference: -2,428.39 True 704,585.169 0.00 0.00 325.59 8,035.37 7,961.22 Survey Calculation Method: Minimum Curvature 5,957,985.961 704,559.293 3.00 122.64 330.00 8,106.74 Database: 5,282.30 EDM R5K-Alaska PROD - ANCPi 5,958,022.694 Azi TVo TVDSS NIS EMI Northing Easting DLeg TFace 5,958,027.917 0 (usft) (usft) (usft) (usft) (usft) (usft( ('1100usft) 1°I 321.79 6,774.15 6,700.00 4,603.52 .1,950.25 5,957,358.701 705,079.833 0.00 0.00 321.79 6,775.61 6,701.46 4,604.26 -1,950.83 5,957,359.428 705,079.227 0.00 0.00' 321.79 6,859.56 6,785.41 4,646.96 -1,984.43 5,957,401.177 705,044.463 0.00 0.00 321.79 6,943.52 6,869.37 4,689.65 -2,018.04 5,957,442.925 705,009.699 0.00 0.00 321.79 7,027.47 6,953.32 4,732.34 -2,051.64 5,957,484.674 704,974.934 0.00 0.00 321.79 7,111.43 7,037.28 4,775.03 -2,085.25 5,957,526.423 704,940.170 0.00 0.00 321.79 7,195.38 7,121.23 4,817.72 -2,118.85 5,957,568.172 704,905.405 0.00 0.00 321.79 7,224.15 7,150.00 4,832.36 -2,130.37 5,957,582.479 704,893.491 0.00 0.00 321.79 7,279.33 7,205.18 4,860.42 -2,152.45 5,957,609.920 704,870.641 0.00 0.00 321.79 7,363.29 7,289.14 4,903.11 -2,186.06 5,957,651.669 704,835.877 0.00 0.00 321.79 7,447.24 7,373.09 4,945.80 -2,219.66 5,957,693.418 704,801.112 0.00 0.00 321.79 7,531.19 7,457.04 4,988.49 -2,253.26 5,957,735.167 704,766.348 0.00 0.00 321.79 7,615.15 7,541.00 5,031.19 -2,286.87 5,957,776.916 704,731.583 0.00 0.00 321.79 7,699.10 7,624.95 5,073.88 -2,320.47 5,957,818.664 704,696.819 0.00 0.00' 321.79 7,757.15 7,683.00 5,103.40 -2,343.71 5,957,847.532 704,672.780 0.00 0.00 321.79 7,783.05 7,708.90 5,116.57 -2,354.07 5,957,860413 704,662.055 0.00 0.00 321.79 7,867.01 7,792.86 5,159.26 -2,387.68 5,957,902.162 704,627.290 0.00 0.00 321.79 7,950.96 7,876.81 5,201.95 -2,421.28 5,957,943.911 704,592.526 0.00 0.00 321.79 7,968.72 7,894.57 5,210.99 -2,428.39 5,957,952.745 704,585.169 0.00 0.00 325.59 8,035.37 7,961.22 5,244.91 -2,453.35 5,957,985.961 704,559.293 3.00 122.64 330.00 8,106.74 8,034.59 5,282.30 -2,476.94 5,958,022.694 704,534.682 3.00 11943 330.00 8,119.15 8,045.00 5,287.61 -2,480.00 5,958,027.917 704,531.472 0.00 0.00 21152018 11:40:02AM Page 5 COMPASS 5000.1 Build 81D BP BAKER ER (UGHES bp BP Well Plan Survey Report GEcompany Company: North America - ALASKA -BP Local Co-ordinate Reference: Well 11-23 Project: Prudhoe Bay TVD Reference: 11-23B Plan RKB Q? 74.15usft (11-23B Plan RKB) Site: PB DS 11 MD Reference: 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) Well: 11-23 North Reference: True Wellbore: PLAN 11-23B Survey Calculation Method: Minimum Curvature Design: 11-23B WPO8 Database: EDM R5K - Alaska PROD - ANCP1 Planned Survey MD Inc Azi TVD TVDSS NIS ENV Northing Easting DLeg TPace (usR) (1 (1) (usft) (usR( (usft) (usR) (usR) (usft) (°1100usft) (`) 10,400.00 30.50 330.00 8,121.09 8,046.94 5,288.60 -2,480.57 5,958,028.888 704,530874 000 0.00 10,500.00 30.50 330.00 8,207.25 8,133.10 5,332.56 -2,505.95 5,958,072.125 704,504.298 0.00 0.00 10,600.00 30.50 330.00 8,293.41 8,21926 5,376.51 -2,531.33 5,958,115.362 704,477.722 0.00 0.00 10,634.51 30.50 330.00 8,323.15 8,249.00 5,391.68 -2,540.09 5,958,130.264 704,468.550 0.00 0.00 LCWTSHC 10,635.67 30.50 330.00 8,324.15 8,250.00 5,392.19 -2,540.38 5,958,130.786 704,468.242 0.00 0.00 Start 200.00 hold at 10635.67 MD 10,653.08 30.50 330.00 8,339.15 8,265.00 5,399.84 -2,544.80 5,958,138.313 704,463.615 0.00 0.00 TSAD 10,700.00 30.50 330.00 8,379,58 8,305.43 5,420.46 -2,55870 5,958,158.598 704,451.146 0.00 0.00 10,728.52 30.50 330.00 8,404.15 8,330.00 5,433.00 -2,563.94 5,958,170.930 704,443.566 0.00 0.00 42N 10,735.48 30.50 330.00 8,410.15 8,336.00 5,436.06 -2,565.71 5,958,173.941 704,441.716 0.00 0.00 42P 10,800.00 30.50 330.00 8,465.74 8,391.59 5,464.42 -2,582.08 5,958,201.835 704,424.570 0.00 0.001 10,809.76 30.50 330.00 8,474.15 8,400.00 5,468.71 -2,564.56 5,958,206.056 704,421.976 0.00 0.00 TCGL 1 10,835.67 30.50 330.00 8,496.48 8,422.33 5,480.10 -2,591.13 5,958,217.259 704,415.090 0.00 0.00 Start Build 10.00 10,838.78 30.81 330.00 8,499.15 8,425.00 5,481.47 -2,591.93 5,958,218.609 704,414.260 10.00 0.00 GWC 10,862.37 33.17 330.00 8,519.15 8,445.00 5,492.29 -2,598.17 5,958,229.252 704,407.718 10.00 0.00 BCGL 10,900.00 36.93 330.00 8,549.95 8,475.80 5,511.00 -2,608.98 5,958,247.661 704,396.403 10.00 0.00 10,964.40 43.37 330.00 8,599.15 8,525.00 5,546.95 -2,629.73 5,958,283.018 704,374.670 10.00 0.00 24N 10,975.51 44.48 330.00 8,607.15 8,533.00 5,553.62 -2,633.58 5,958,289.582 704,370.635 10.00 0.00 24P 11,000.00 46.93 330.00 8,624.25 8,550.10 5,568.80 -2,642.35 5,958,304.516 704,361.455 10.00 0.00 2/152018 11 r40:02AM Page 6 COMPASS 5000.1 Build 810 by BP Well PlBP an Survey Report B F�UGHES r i,wy Company: North America -ALASKA - BP Project. Prudhoe Bay Site: PB DS 11 Well: 11-23 Wellbore: PLAN 11-23B Design: 11-23B WP08 Planned Survey MD Inc (usft) )°) 11,011.69 48.10 23N 11,045.79 51.51 22N 11,070.57 53.99 22P 11,100.00 56.93 11,167.28 63.66 PGOC - 7000 11,200.00 66.93 11,246.06 71.54 TDF 11,300.00 76.93 11,400.00 86.93 11,430.67 90.00 Start 500.00 hold at 11430.67 MD 11,500.00 90.00 11,600.00 90.00 11,700.00 90.00 11,800.00 90.00 11,900.00 90.00 11,930.67 90.00 Shit DLS 2.00 TFO 40.00 12,000.00 91.06 12,03087 91.53 Start 400.00 hold at 12030.67 MD 12,100.00 91.53 12,200.00 91.53 211512018 11:40:02AM Page 7 COMPASS 5000.1 Build 81D Local Co-ordinate Reference: Well 11-23 TVD Reference: 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) MD Reference: 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Azi TVD TVDSS NIS ENV Northing Easting DLeg TFace (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usf) (°) 330.00 8,632.15 8,558.00 5,576.27 -2,646.66 5,958,311.863 704,356.940 10.00 0.00 330.00 8,654.15 8,580.00 5,598.82 -2,659.68 5,958,334.046 704,343.305 10.00 0.00 330.00 8,669.15 8,595.00 5,615.91 -2,669.54 5,958,350.850 704,332.976 10.00 0.00 330.00 8,685.83 8,611.68 5,636.90 -2,681.66 5,958,371.499 704,320.283 10.00 0.00 330.00 8,719.15 8,645.00 5,687.48 .2,710.86 5,958,421.251 704,289.703 10.00 0.00 330.00 8,732.82 8,658.87 5,713.22 .2,725.73 5,958,446.574 704,274.138 10.00 0.00 330.00 8,749.15 8,675.00 5,750.51 -2,747.26 5,958,483.255 704,251.591 10.00 0.00 330.00 8,763.80 8,689.65 5,795.45 -2,773.20 5,958,527.460 704,224.420 10.00 0.00 330.00 8,777.81 8,703.66 5,881.08 -2,822.64 5,958,611.699 704,172.641 10.00 0.00 330.00 8,778.64 8,704.49 5,907.64 -2,837.97 5,958,637.817 704,156.587 10.00 0.00 330.00 8,778.64 8,704.49 5,967.67 -2,872.64 5,958,696.875 704,120.287 0.00 0.00 -- 330.00 8,778.64 8,704.49 6,054.28 -2,922.64 5,958,782.064 704,067.924 0.00 0.00 330.00 8,778.64 8,704.49 6,140.88 -2,972.64 5,958,867.253 704,015.561 0.00 0.00 330.00 8,778.64 8,704.49 6,227.48 -3,022.64 5,958,952.441 703,963.199 0.00 0.00 330.00 8,778.64 8,704.49 6,314.08 -3,072.64 5,959,037.630 703,910.836 0.00 0.00 330.00 8,778.64 8,704.49 6,340.65 -3,087.97 5,959,063.761 703,894.775 0.00 0.00 330.89 8,777.99 8,703.84 6,400.95 -3,122.17 5,959,123.096 703,858.937 2.00 40.001 331.29 8,777.30 8,703.15 6,427.79 -3,136.99 5,959,149.520 703,843.378 2.00 40.01 331.29 8,775.45 8,701.30 6,488.57 -3,170.29 5,959,209.356 703,808.424 0.00 0.00 331.29 8,772.77 8,698.62 6,576.24 -3,218.31 5,959,295.668 703,758.005 0.00 0.001 211512018 11:40:02AM Page 7 COMPASS 5000.1 Build 81D Lip BP BAT ICER � p BP Well Plan Survey Report uGHES a GE company Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB DS 11 Well: 11-23 Wellbore: PLAN 11-23B Design: 11-23B WP08 Planned Survey MD Inc Well 11-23 (usft) (°) 11-238 Plan RKB Q 74.15usft (11-238 Plan RKB) 12.300.00 91.53 12,400.00 91.53 12,430.67 91.53 Start Drop -2.00 EDM R5K-Alaska PROD -ANCP1 12,482,27 90.50 Start 350.00 hold at 12482.27 MD 12,500.00 90.50 12,600.00 90.50 12,700.00 90.50 12,800.00 90.50 12,832.27 90.50 Start Build 2.00 5,959,381.979 12,882.27 91.50 Start 400.00 hold at 12882.27 MD 12,900.00 91.50 13,000.00 91.50 13,100.00 91.50 13,200.00 91.50 13,282.27 91.50 Start DLS 3.00 TFO 80.00 13,300.00 91.59 13,400.00 92.11 13,500.00 92.62 13,600.00 93.13 13,632.27 93.29 Start DLS 3.00 TFC) 91.00 8,691.54 13,700.00 93.25 13,800.00 93.19 Local Co-ordinate Reference: Well 11-23 TVD Reference: 11-238 Plan RKB Q 74.15usft (11-238 Plan RKB) MD Reference: 11-23B Plan RKB Q 74.15usft (11-238 Plan RKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Azl TVD TVDSS NIS ENV Northing Easting DLeg TFace (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (°) 331.29 8,770.10 8,695.95 6,663.92 -3,266.34 5,959,381.979 703,707.585 0.00 0.00 331.29 8,767.42 8,693.27 6,751.59 -3,314.37 5,959,468.291 703,657.166 0.00 0.00 331.29 8,766.60 8,692.45 6,778.48 -3,329.10 5,959,494.766 703,641.700 0.00 0.00 331.29 8,765.69 8,691.54 6,823.72 -3,353.88 5,959,539.310 703,615.879 2.00 180.00 331.29 8,765.54 8,691.39 6,839.27 -3,362.40 5,959,554.616 703,606.738 0.00 0.00 331.29 8,764.66 8,690.51 6,926.97 -3,410.44 5,959,640.955 703,558.302 0.00 0.00 331.29 8,763.79 8,689.64 7,014.67 -3,458.48 5,959,727.294 703,505.867 0.00 0.00 331.29 8,762.92 8,688.77 7,102.37 -3,506.53 5,959,813.633 703,455.431 0.00 0.00 331.29 8,762.64 8,688.49 7,130.67 -3,522.03 5,959,841.497 703,439.154 0.00 0.00 331.29 8,761.76 8,687.61 7,174.52 -3,546.05 5,959,884.661 703,413.940 2.00 0.00. 331.29 8,761.30 6,687.15 7,190.06 -3,554.56 5,959,899.962 703,405.001 0.00 0.001 331.29 8,758.68 8,684.53 7,277.73 -3,602.59 5,959,986.275 703,354.581 0.00 0.00 331.29 8,756.06 8,681.91 7,365.40 -3,650.62 5,960,072.588 703,304.160 0.00 0.00 331.29 8,753.45 8,679.30 7,453.08 -3,698.65 5,960,158.901 703,253.740 0.00 0.00 331.29 8,751.29 8,677.14 7,525.21 -3,738.16 5,960,229.912 703,212.258 0.00 0.00 331.81 8,750.81 8,676.66 7,540.79 -3,746.60 5,960,245.254 703,203.390 3.00 80.00 334.77 8,747.58 8,673.43 7,630.06 -3,791.52 5,960,333.250 703,156.030 3.00 80.01 337.72 8,743.45 8,669.30 7,721.50 -3,831.77 5,960,423.542 703,113.286 3.00 80.11 340.69 8,738.44 8,664.29 7,814.86 -3,867.22 5,960,515.883 703,075.278 3.00 80.23 341.64 8,736.63 8,662.48 7,845.35 -3,877.62 5,960,546.079 703,064.040 3.00 80.38 343.68 8,732.77 8,658.62 7,909.89 -3,897.78 5,960,610.037 703,042.119 3.00 91.00 ISI 346.68 8,727.15 8,653.00 8,006.40 -3,923.31 5,960,705.802 703,013.936 3.00 91.12 217&2018 11:40:02AM Page 8 COMPASS 5000.1 Build 81D Company: North America -ALASKA - BP Project: Prudhoe Bay 8,575.00 Site: PB DS 11 Local Co-ordinate Well: 11-23 Well 11-23 Wellbore: PLAN 11-23B 0.00 Design: 11-238 WP08 8,635.82 Planned Survey 9,391.51 MD Inc 5,962,091.234 (usft) (°) Plan RKB) 13,900.00 93.12 14,000.00 93.04 14,100.00 92.95 14,200.00 92.85 14,300.00 92.75 14,400.00 92.84 14,432.27 92.60 Start DLS 2.00 TFO 180.00 14,500.00 91.24 14,512.16 91.00 Start 430.00 hold at 14512.16 MD 14,600.00 91.00 14,700.00 91.00 14,800.00 91.00 14,900.00 91.00 14,942.16 91.00 Start DLS 8.00 TFO 0.00 PROD - ANCP1 15,000.00 95.63 15,100.00 103.63 15,111.00 104.51 TDF (too up) Fasting 15,157.00 108.19 PGOC (toe up) (wily 15,157.34 108.21 Start 96.00 hold at 15157.34 MD 15,200.00 108.21 15,252.34 108.21 TD at 15252.34 8,721.65 BP BP Well Plan Survey Report r B kUGHES GEcompany 5.66 8,649.26 8,575.11 9,350.87 -3,894.10 5,962,050.495 703,006.124 8.00 0.00 5.66 8,649.15 8,575.00 9,351.19 Local Co-ordinate Reference: Well 11-23 8.00 0.00 5.66 8,635.82 8,561.67 9,391.51 TVD Reference: 5,962,091.234 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) 0.00 5.66 8,619.46 8,545.31 MD Reference: -3,885.16 11-23B Plan RKB Q 74.15usft (11-23B Plan RKB) 0.00 0.00 North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Ari TVD TVDSS NIS E/W Northing Fasting DLeg TFace (°) (wily (usft) (usft) (usft) (usR) (usft) 1,1100usft) (°) 34968 8,721.65 8,647.50 8,104.12 -3,943.76 5,960,802.918 702,990.809 3.00 91.28 352.69 8,716.28 8,642.13 8,202.79 -3,959.06 51960,901.120 702,972.801 3.00 91.45 355.69 8,711.06 8,636.91 8,302.13 -3,969.17 5,961,000.138 702,959.961 3.00 91.61 358.69 8,706.00 8,631.85 8,401.87 -3,974.06 5,961,099.701 702,952.324 3.00 91.77 1.69 8,701.11 8,626.96 8,501.74 -3,973.72 5,961,199.536 702,949.913 3.00 91.92 4.70 8,696.41 8,622.26 8,601.46 -3,968.16 5,961,299,369 702,952.732 3.00 92.07 5.66 8,694.94 8,620.79 8,633.57 -3,965.25 5,961,331.541 702,954.756 3.00 92.21 5.66 8,692.07 8,618.52 8,700.92 -3,958.56 5,961,399.054 702,959.581 2.00 180.00 5.66 8,692.43 8,618.28 8,713.03 -3,957.36 5,961,411.185 702,960.448 2.00 -180.00 5.66 8,690.90 8,616.75 8,800.42 -3,948.70 5,961,498.779 702,966.706 0.00 0.00 566 8,689.15 8,615.00 8,899.92 -3,938.83 5,961,598.505 702,973.831 0.00 0.00 566 8,687.41 8,613.26 8,999.41 -3,928.96 5,961,698.230 702,980.956 0.00 0.001 5.66 8,685.66 6,611.51 9,098.91 -3,919.09 5,961,797.956 702,988.081 0.00 0.00 566 8,684.93 8,610.78 9,140.86 -3,914.93 5,961,840.005 702,991.085 0.00 0.00 5.66 8,681.59 8,607.44 9,198.30 -3,909.23 5,961,897.578 702,995.199 8.00 0.00 5.66 8,664.88 8,590.73 9,296.33 -3,899.51 5,961,995.834 703,002.219 8.00 0.00 566 8,662.20 8,588.05 9,306.95 -3,898.46 5,962,006.476 703,002.979 8.00 0.00 5.66 8,649.26 8,575.11 9,350.87 -3,894.10 5,962,050.495 703,006.124 8.00 0.00 5.66 8,649.15 8,575.00 9,351.19 -3,894.07 5,962,050.821 703,006.147 8.00 0.00 5.66 8,635.82 8,561.67 9,391.51 -3,890.07 5,962,091.234 703,009.035 0.00 0.00 5.66 8,619.46 8,545.31 9,440.99 -3,885.16 5,962,140.827 703,012.578 0.00 0.00 2/15/2018 11:40:02AM Page 9 COMPASS 5000.1 Build 810 up Well 11-23 TVD Reference: Company: North America - ALASKA - BP Project: Prudhoe Bay True Site: PB DS 11 Database: Well: 11-23 Wellbore: PLAN 11-23B Name (in) (in) Design: 11-23B WPOS Casing Points Measured Vertical Depth Depth (usft) (usft) 15,25234 8,619.50 41/2' 10,636.00 8,324.47 7" BP BP Well Plan Survey Report B IUGHES E WY Local Co-ordinate Reference: Well 11-23 TVD Reference: 11-23B Plan RKB Q 74.15usft (11-238 Plan RKB) MD Reference: 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Casing Hole Diameter Diameter Name (in) (in) 4.500 6.125 7.000 8.500 2/15/2018 11:40:02AM Page 10 COMPASS 5000.1 Build 81D BP 0 by BP Well Plan Survey Report BA UGHES Company: Project: Site: Well: Wellbore: Design: Formations North America - ALASKA - BP Local Co-ordinate Reference: Well 11-23 Prudhoe Bay TVD Reference: 11-23B Plan RKB Q 74.15usfl (11-23B Plan RKB) PB DS 11 MD Reference: 11-23B Plan RKB @ 74.15us%(11-23B Plan RKB) 11-23 North Reference: True PLAN 11-23B Survey Calculation Method: Minimum Curvature 11-23B WP08 Database: EDM R5K - Alaska PROD - ANCP1 Measured Vertical Dip Depth Depth Dip Direction (usR) (usR) Name Lithology (°) P) 10,964.34 8,599.15 24N 10,397.70 8,119.15 THRZ 8,291.98 6,349.15 WS2 7,654.72 5,814.15 UGI 11,245.93 8,749.15 TDF 10,809.72 8,474.15 TCGL 9,969.10 7,757.15 CM1 10,653.04 8,339.15 TSAD 11,167.18 8,719.15 PGOC 10,728.47 8,404.15 42N 10,838.73 8,499.15 GWC 10,975.45 8,607.15 24P 15,111.00 8,662.24 TDF (toe up) 0.00 6,774.09 5,109.15 UG3 8,798.21 6,774.15 CM3 11,045.72 8,654.15 22N 6,440.31 4,900.15 UG4 10,862.32 8,518.15 BCGL 11,167.18 8,719.15 7000 10,735.44 8,410.15 42P 9,334.22 7,224.15 CM2 11,011.63 8,632.15 23N 11,070.50 8,669.15 22P 15,157.00 8,649.30 PGOC (toe up) 0.00 10,634.47 8,323.15 LCUITSHC 2/152018 11:40:02AM Page 11 COMPASS 5000.1 Build BID BP by BP Well Plan Survey Report B��f]7HES IaGE company Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 11-23 Project: Prudhoe Bay TVD Reference: 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) Site: PB DS 11 MD Reference: 11-238 Plan RKB @ 74.15usft (11-23B Plan RKB) Well: 11-23 North Reference: True Wellbore: PLAN 11-23B Survey Calculation Method: Minimum Curvature Design: 11-23B WP08 Database: EDM R5K - Alaska PROD - ANCP1 Plan Annotations Measured Vertical Local Coordinates Depth Depth -NI-S +El -W (usft) (usft) (usft) (usft) Comment 6,114.15 4,708.89 3,220.49 -1,030.67 TIP 6,450.00 4,905.71 3,469.03 -1,141.46 KOP 6,466.00 4,914.94 3,480.77 -1,147.20 Start 20.00 hold at 6466.00 MD 6,486.00 4,926.48 3,495.29 -1,154.69 Start DLS 3.00 TFO-164.77 7,255.00 5,478.53 3,944.67 -1,431.66 Start 2966.16 hold at 7255.00 MD 10,221.16 7,968.72 5,210.99 -2,428.39 Start DLS 3.00 TFO 122.64 10,385.67 8,108.74 5,282.30 -2,476.94 Start 250.00 hold at 10385.67 MD 10,635.67 8,324.15 5,392.19 -2,540.38 Start 200.00 hold at 10635.67 MD 10,835.67 8,496.48 5,480.10 -2,591.13 Start Build 10.00 11,430.67 8,778.64 5,907.64 -2,837.97 Start 500.00 hold at 11430.67 MD 11,930.67 8,778.64 6,340.65 -3,087.97 Start DLS 2.00 TFO 40.00 1 12,030.67 8,777.30 6,427.79 -3,136.99 Start 400.00 hold at 12030.67 MD 12,430.67 8,766.60 6,778.48 -3,329.10 Start Drop -2.00 12,482.27 8,765.69 6,823.72 -3,353.88 Start 350.00 hold at 12482.27 MD 12,832.27 8,762.64 7,130.67 -3,522.03 Start Build 2.00 12,882.27 8,761.76 7,174.52 -3,546.05 Start 400.00 hold at 12882.27 MD 13,282.27 8,751.29 7,525.21 -3,738.16 Start DLS 3.00 TFO 80.00 13,632.27 8,736.63 7,845.35 -3,877.62 Start DLS 3.00 TFO 91.00 14,432.27 8,694.94 .8,633.57 -3,965.25 Start DLS 2.00 TFO 180.00 14,512.16 8,692.43 8,713.03 -3,957.36 Start 430.00 hold at 14512.16 MD 14,942.16 8,684.93 9,140.86 -3,914.93 Start DLS 8.00 TFO 0.00 15,157.34 8,649.15 9,351.19 -3,894.07 Start 95.00 hold at 15157.34 MD 15,252.34 8,619.46 9,440.99 -3,885.16 TD at 15252.34 Checked By: Approved By: Date: 2/1512018 11:40.02AM Page 12 COMPASS 5000.1 Build BID North America - ALASKA - BP Prudhoe Bay PB DS 11 11-23 PLAN 11-23B 11-23B WP08 Anticollision Summary Report 15 February, 2018 BAT IGI0 1 aGEcompany iNzbp Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 11 Site Error: 0.00usft Reference Well: 11-23 Well Error: O.00usft Reference Wellbore PIAN 11-23B Reference Design: 11-23B WP08 BP BA ER Anticollision Report IGHES .3 rr mmpa�v Local Co-ordinate Reference: Well 11-23 TVD Reference: 11-23B Plan IRKS @ 74.15usft (11-2313 Plan RKB) MD Reference: 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP1 Offset TVD Reference: Offset Datum teference 11-23B WPOB Centre to Ttter type: NO GLOBAL FILTER: Using user defined selection 8 filtering cntena To merpolation Method: MD Inten al 25.00usft Error Model: ISCWSA )epth Range: 6,114.15 to 15,252.34usft Scan Method: Tray. Cylinder North tesults Limited by: Maximum center -center distance of 1,720.66usft Error Surface: Elliptical Conic Survey Tool Program Date 2/15/2018 Centre to No -Go From To Measured Centre (usft) (usft) Survey (Wellbore) Tool Name Description 117.15 598.15 Sperry Boss Gyro MS 1NRP 57.0' Copy (11 BOSS -GYRO Spent' -Sun BOSS gyro mu9ishot 598.15 6,114.15 MWD (11-23) MWD MWD -Standard 6,114.15 6,450.00 11-23B WP08 (PLAN 11-23B) MWD MWD -Standard 8,450.00 6,880.00 11-23B WPOS (PLAN 11-238) BLIND Blind drilling 6,880.00 10,636.0011-23B WP08(PLAN 11-23B) MWD MWD - Standard 6,880.00 10,636.00 11-23BWP08 (PLAN 11-23B) MWD+IFR+MS-WOCA MWD +IFIR +Multi Station W/O Crustal 10,636.00 15,252.34 11-23B WP08 (PLAN 11-23B) MWD MWD -Standard 10,636.00 15,252.34 11-23B WP08 (PLAN 11-23B) MWD+IFR+MS-WOCA MWD+ IFR +Multi Station W/O Crustal Summary Site Name Offset Well - Wellbore - Design Lis DS 02 1-2-08 -1-2-08A- -2-08A Lis DS 03 1-3-11 - 1-3-11 - 13-11 1-3-15 - 1-3-15 -1-3-15 1-3-23 - 1-3-23 - 1-3-23 PB DS 11 11-09 - 11-09 - 11-09 11-09 - 11-09A - 11-09A 11-10 - 11-10 - 11-10 11-10 - 11-10A- 11-10A 11-11 - 11-11 - 11-11 11-23 - 11-23 - 11-23 11-23 - 11-23A - 11-23A 11-27 - 11-27 - 11-27 11-28 - 11-28 - 11-28 11-28 - 11-28A- 11-28A 11-28 - 11-28B - 11-28B 11-30 - 11-30 - 11-30 11-30 - 11-30A - 11-30A 11-33 - 11-33 - 11-33 Plan Lisburne- Plan Lisburne - Lisburne Wp 1.0 Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Depth Depth Distance (usft) from Plan (usft) (usft) (usft) 6,124.56 (usft) 14,405.06 15,588.00 258.72 52.85 242.93 Pass - Minor 1/200 2/152018 11:40.94AM Page 2 of 3 COMPASS 5000.1 Build 8l D Out of range 14,272.86 10,375.00 1,423.41 364.41 1,105.96 Pass - Major Risk 10,999.87 10,350.00 353.40 283.60 80.25 Pass -Major Risk 6,124.56 6,700.00 1,303.59 254.34 1,058.11 Pass -Major Risk 6,125.26 6,700.00 1,304.02 254.39 1,058.51 Pass - Major Risk 8,875.82 9,525.00 897.85 331.18 665.10 Pass - Major Risk 8,875.82 9,525.00 897.85 330.92 665.36 Pass - Major Risk Out of range 6,494.07 6,475.00 1.43 2.57 1.43 Pass-NOERRORS 6,489.38 6,475.00 142 2.21 1.42 Pass-NOERRORS 11,660.15 12,210.00 971.84 406.98 566.50 Pass - Major Risk Out of range Out of range Out of range 9,196.42 9,175.00 243.05 72.52 186.59 Pass -Mirror 11200 9,266.59 9,250.00 240.96 47.56 240.49 Pass - Minor 1/200 Out of range Out of range 2/152018 11:40.94AM Page 2 of 3 COMPASS 5000.1 Build 8l D by Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 11 Site Error: O.00usft Reference Well: 11-23 Well Error: O.00usft Reference Wellbore PLAN 11-23B Reference Design: 11-23B WPOB r BP BA, ICER Antioollision Report UGHES GE<.,, Local Co-ordinate Reference: Well 11-23 TVD Reference: 11-23B Plan RKB @ 74.15usft (11-238 Plan RKB) MD Reference: 11-23B Plan RKB @ 74.15usft (11-23B Plan RKB) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP1 Offset TVD Reference: Offset Datum Reference Depths are relative to 11-23B Plan RKB @ 74.15usft Coordinates are relative to: 11-23 )ffset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK ventral Meridian is 150° 0' 0.000 W' Grid Convergence at Surface is: 1.58" Ladder Plot 1800 I I I I I sI 31350 - - - --- '- -I o I I I I v ' C _ J _ _ _ _ _ _ _ _ J _ J _ _ 0 n � 900- 1E 0 t 00 C1 _J _J _J J _J _ U 1 1 I I O 2 I I I I r I I � 450 � I I I I I 0 0 2500 5000 7500 10000 12500 15000 Measured Depth (2500 usft/n) LEGEND 11-09,11-09A,11-09AV2 —W 11-27,11-27,11-27V1 11-09,11-09,11-09V1 11-28,11-28,11-28V1 11-10,11-10,11-10V1 —f— 11-28,11-28B, 11-28B VO 11-10,11-1 OA, 11-1 OA VO $ 11-28,11-28A, 11-28AV10 11-11,11-11,11-11 V1 $ 1130,11-30A, 11-30AVO 11-23,11-23A, 11-23A V1 —0— 11-30,11-30,11-3OV1 11-23,11-23,11-23VO $ 1133,11-33,11-33V1 $ 1-3-23,1-3-23,1-3-23V1 —rte L2-08, L2-0SA,L2.OBA V2 $ L3 -15,L3 -15,L3 -15V2 —dr Plan Lisbume,Plan Lisbume, Lisbume VYp1 $ 1-3-11,1-3-11,1-3-11 V7 $ 11-23BWP08 2/15/1018 11:40:34AM Page 3 of 3 COMPASS 50001 Build 81D WELL DETAILS. 11-23 G,nom Level 2720 rNFS sEI�V NorNiTg Eesing Laitud, LongiW4e Slot 0.00 0.00 5952810.850 ]0]155.9]0 70`15'28.245N 148'192].005W WELLBORE DETAIM PUN 11-23B Project: Prudhoe Bay 11-236 wonkwnnx bp Site: PBDS11 Wall 11-230Wellbore: Parent Wellbore 11-23 �ov Tie on MD6114.15 PL 1411.2313 PNn:11-2313507708711-2WPIAN11-2313) q uwn. n. WELL DETAILS. 11-23 G,nom Level 2720 rNFS sEI�V NorNiTg Eesing Laitud, LongiW4e Slot 0.00 0.00 5952810.850 ]0]155.9]0 70`15'28.245N 148'192].005W WELLBORE DETAIM PUN 11-23B PEFPAE7K;EKUM1Mw 11-236 Coai4ireb(wE1�Msia: welllf 1.y T,u. WrN VekalINDl Relnerca II-25BPIsn I1NBB]A 15us11112]9P6n RNRI Parent Wellbore 11-23 sweol N$)Pa&enm. sbl IvOBN DM Tie on MD6114.15 MsseardCoth RNuerce: D23BMw PBB@]4.EN(h28BPIPi LtJebnwhool M. -C. SECTKINDETAILS , wax G46114G�TNLS q MD "I Ari ND R46S 'FJ.W Okg TF. VBM Ta19et II -2113 N'No ND MD sp. In 9My 6114.15 53.50 336.50 470899 3220.49 -1030.67 6450.00 5475 335.16 4905.71 346903 .114746 0.00 0.00 3370.44 054 -0724 364244 anan lW3s.00 7' 7.aoo .1. 5. 41rr 4sW I1-1313Tx 646600 5477 332.71 4914.94 348077 114720 1250 9000 365548 O eax 648600 5477 33271 492648 349529 115469 0.00 000 367776 uwTP1oK H -PBT] } Op 1-23BIE 125500 3291321.79547853 391467 143766 7.00464.77419271 ,. 7022116 3291 321.79 7968.72 521099 242&39 000 000 574301 Nv w Mo. 1038567 3050 33000 810&74 528230 .247&94 300 12264 582743 noew ...u5 TIP 11-23BTi 10635.67 30.50 330.00 8324.15 539219 -2540.38 0.00 0.00 5953.19 anon+ wwm xav rpl4s4 Mw searmaonmaaeomw -- 10835.67 30.50 330.00 8496A8 5460.10 -2591.13 0.00 0.00 6053.80 M269 600 SMOLS300TF04M77 11430.67 90.00 330.00 877&64 5907.64 -2837.97 10.00 0.00 6543.09 1 waIa IIss.W slM mm.la... Ir n). 11930.67 90.00 330.00 877&64 6340.65 4087.97 0.00 090 7038.65 Iws72 iwPu6 radow3wwolthm 610874 iwMBl sbl2som+tl+tl+waSeTw fi6M , 12030.67 91.53 331.29 8777.30 6427.79 -313&99 200 40.00 7137.89 812415 ea l SG1We.h4b01w1887w one".ionto srdeamnao « Gx1U 72430.67 91.53 331.29 8766.60 6778.48 -332810 12482.27 90.50 331.29 8765.69 6823.72 -335388 0.00 0.00 7535.30 200 180.00 758&57 ene64114mm apnw000kpaN4m.mw Ellflel u9Ao7 S.M1201100o O 12832.27 90.50 331.29 876264 7130.67 452203 0.00 0.00 7934.41 tMe nowt. 67M rn sm9 I 12882.27 91.50 331.29 8761.76 7171,52 -354&05 2.00 000 7984.09 most. IMIV smv,op xao 1328227 91.50 331.29 8751.29 7525.21 373&16 0.00 0.00 8381.50 emsm 2482m A.'awkMelEwznw 1363227 93.29 341.64 8736.63 7845.35 3877.62 3.03 80.00 8730.63 Me 4 not Uadoed 20o 1 116175 12MI27 smwmorwNawzl]w 4811 14432.27 9260 5.66 8694.94 8633.57 3965.25 3.50 91.00 949291 MUD INU27 sarrOSS a4TF0Wm 14512.16 91.00 5.66 8692.43 871303 -3957.36 2.00 180.00 956739 alone ;3Pz27 SWOUSUDTFONao 4,111 1494216 91.00 5.66 8694.93 9140.86 -3914,93 0.00 0.00 994292 ams4 XUo smLas2m TFa 411 Moo MizM s e"n oMNY+es.x+sw 15157.34 108.21 5.66 8649.15 9351.19 .3894.07 8.00 0.001012&50 edoo l C,M sadowtomTne'o Are rrn -nm -noo u 15252.34 108.21 5.66 6619.46 9440.99 -885.16 0.00 0.0010209.16 weals loh...%A. a1515714w _ 65 a. 1s45214 Meeting 4550 TIP KOP Soe20 00 hold 46402. MMD ! 49N1 0 - UGi - - --. Sw,L➢25300 TFO-1637] - Jul SIN2966. 16h01dL7215,UUMD 52 ^O 56 . a ^ � SIon DLS3 DUTP0122 W DOI S59* SW210 00 holdal lmn5 67MD a on 61W SIW200(101101da1111(35,67MD WSE 141 0 J Fe\J 51ar1Bolla lMUM m5c, -. CM3 S lb or CME.1\R QVJ 5 ^°a 4 0 c c ll 53 y o .1 .`y v.. 01 e CMI M(oo. fit+' 8050_ - 55� 2 S ZT 53 �� ` TFIPG-..�iA 55�� SHC s Sad F, _ p �IdwaBe) >.. 875 II-DBi'1 o' = - - _. =o DT' II-23BTD Q 91 _ _ y II-23BT2 IIiJ II-2lBTX `Br MS Ian RKB® I-_-._--.-_ ----- - - _ 4.15us8 (11238 Plan RK9) --.. -. II -11111"1 II -23B T6 II-23BT7 II -238T5 I-II 7850 3150 3350 3150 4250 4550 49•ll 5230 SGW 5950 6300 6650 71100 7350 77w PU50 BJW 777511 9150 MSU 97700 10150 777850 707750 1120M 11550 11 BAF�UGHES I I I-IMT4 I -2381'i 11-238T2 II -13871 I I-2313 PmiIL I .1.m SUNEYP�R4M Oeb:3118U2r1919m9 VNUakd. ym Voten'. Owner real searrPla1 TW 11].15 598.15 Sperry Bacl3I,0MSW111-231 98.15 6114.15 MWD(1Ia) MWD 6114.15 64918 Ii-ZM%VPM(PIANII-23B1 MND 6W.W M.M It-23IMPPAFANfIePHp mm 1MA6AB 1133B15PO87PlAN 11 OW MM 106161,0 I1-23BWP50tPUN11-238) IWNFR+ASiM1b(A 10636011 1525234 I1 -BIH PEfi0P ANtl4 M 10hithm 1525234 I1 -AB WP[fi1PUN11-2313) MVD4FR.MSIV(%'A , II -2113 N'No 12 1 LPBra, In I1-1313Tx H -PBT] } 1-23BIE 11-23BTi I I-IMT4 I -2381'i 11-238T2 II -13871 I I-2313 PmiIL I .1.m SUNEYP�R4M Oeb:3118U2r1919m9 VNUakd. ym Voten'. Owner real searrPla1 TW 11].15 598.15 Sperry Bacl3I,0MSW111-231 98.15 6114.15 MWD(1Ia) MWD 6114.15 64918 Ii-ZM%VPM(PIANII-23B1 MND 6W.W M.M It-23IMPPAFANfIePHp mm 1MA6AB 1133B15PO87PlAN 11 OW MM 106161,0 I1-23BWP50tPUN11-238) IWNFR+ASiM1b(A 10636011 1525234 I1 -BIH PEfi0P ANtl4 M 10hithm 1525234 I1 -AB WP[fi1PUN11-2313) MVD4FR.MSIV(%'A ANTISOILISION SETTINGS InterpolatorMethod MD merv.1'.25.00 Depth RO From 6114.15 To 1525234 Retuh, Li OJBy Cent Oslance: 172065 R.m.m.e, Plan 11 23B WP08111 231P1AN ll -2381 Skl Azimuth from North [o] vs Centre to Centre Separation [25 usff/in] Project:P11aY PROGRNM l.^ BIM: PBs Ds DS „ a. -07th 364".6,66.01 Ut/ Well: 11-23 Vempn: Walloon, PLAN11-23B Depth To Plan: 11-238WP08(,1-2XPLAN II -2311) Tool SW -160.]] ,19911 0.00 oW 57..t SW 1220 502>43 11].15 WFI.LO6TPII5. 11.23 SPerry6ose Gym MGWRP5T.0' Copy(11-231 Grountl level. hence] 36501tl1O Gam. $..In .E911, ID 0.00 �FIVJ la[Iflutle ImdWb 0.m0 000 963810860 '101156.810 i0°16']8.9G6N 1,0'tB'91g06W m.. ISS". ANTISOILISION SETTINGS InterpolatorMethod MD merv.1'.25.00 Depth RO From 6114.15 To 1525234 Retuh, Li OJBy Cent Oslance: 172065 R.m.m.e, Plan 11 23B WP08111 231P1AN ll -2381 Skl Azimuth from North [o] vs Centre to Centre Separation [25 usff/in] A _ J -SURVEY PROGRNM -- { BAKER a. -07th 364".6,66.01 DeM.2018-02-067000000 VpaB6m9:Yes Vempn: Depth From Depth To SuneyRan Tool SW -160.]] ,19911 0.00 oW 57..t SW 1220 502>43 11].15 588,15 SPerry6ose Gym MGWRP5T.0' Copy(11-231 60SS-GYRO hence] 36501tl1O Gam. $..In .E911, SB6.15 6114.15 MOAD (tb23) MWD 6999-fi5DD 6114.15 6450.00 11-238 MW (PLAN 11-2381 MWD W 1800 158851 ON) 003 ]934,41 645000 6880.00 11-238 MOB (PIAN 11.238) BLIND 1X32, 93b 31181 5]X83 1w 5.X 48]2b2 6880.00 1083600 11-238 MOB (FILAR 11 .23B) MWD 6680.00 10636.00 11-238 MOB(PWN I1-238) MND-FR-M5-WOCh OW 040 994992 aW O.W 101 ]HSD 10636.00 1525234 It -238 WPO: (PIAN 11-236) MWD 1063800 15252.34 11236 MOB (PIAN tI-23B) MWDNFR-MS-WOL A _ J 11.11, me 11 S. Sale. 9400 49916 OW 0010209 6 Azimuth from North [e] vs Centre to Centre Separation [8 usfUin] 611015 5]50 336.00 VoSM Soo. NOWP OW OW, ]3]OM -- { BAKER a. -07th 364".6,66.01 UGH ES 1950 once ac&. &6603 64.]] 332]1 0.9E6,b 3,%21 111489 008 OW X]1]6 From CoW To MD I -i SW -160.]] ,19911 0.00 oW 57..t SW 1220 502>43 P✓+u'1 6w w I095P 3050 3bV 6320.15 53B3.IS 3540% OLU coo 595319 c--9 hence] 36501tl1O Gam. $..In .E911, ow O,W fio53At 11.11, me 11 S. Sale. 9400 49916 OW 0010209 6 Azimuth from North [e] vs Centre to Centre Separation [8 usfUin] 611015 5]50 336.00 VoSM Soo. NOWP OW OW, ]3]OM 61500 ,)5 ]35.16 emp'v.]1 .0 -1101- a. -07th 364".6,66.01 50.]] 332]1 .1. 3199.n -110 m 1950 once ac&. &6603 64.]] 332]1 0.9E6,b 3,%21 111489 008 OW X]1]6 From CoW To MD ]956.03 3281 32179 54]853 XMP .10186 10an.% 3161 396,4 I. 5210. 3,2698 10]BSd] 3050 3X0 660814 Sam. 2RVR SW -160.]] ,19911 0.00 oW 57..t SW 1220 502>43 I095P 3050 3bV 6320.15 53B3.IS 3540% OLU coo 595319 hence] 36501tl1O Gam. $..In .E911, ow O,W fio53At 6110-690 II0.N 6] Sem. 3XD] 8]]584 SBO]N .708 119N.n] no 9th W B115de 634081 40819] IOTA 0. 650!9 040 0. 63695 6999-fi5DD 12IXW.6] BI d3 X, 'D 5112,4 6.2)6 313699 12430.6] 91. 331.29 8]66811 6]]8°6 oar, 2. 4of9 It.. o4G Ow Tv3530 8500 10500 121529] 050 3N.99 at SW 6623.12 3I98n 126322] We 33129 5]6244 212067 .EIIAI W 1800 158851 ON) 003 ]934,41 105DO -11200196521] 91. Se .29 US . 1114.. .0 132Y9P 9150 33129 8315 ]59591 96X.16 2. OW Mean OW OW 53950 11200- 15252 1X32, 93b 31181 5]X83 1w 5.X 48]2b2 SW Wm 6]3061 ir2c, F. 666 6690.64 n9>51 4085b 3A] 91.0 919291 161216 91,40 Sbfi 8920 5T1]9 435]56 208 itltO 9563,4 104216 91,40 SP 5z9. 0.83 9190% 461183 1S15]3, nm6 l 1. . 131 tronAl +16N.0T OW 040 994992 aW O.W 101 ]HSD 11.11, me 11 S. Sale. 9400 49916 OW 0010209 6 Azimuth from North [e] vs Centre to Centre Separation [8 usfUin] North America - ALASKA - BP Prudhoe Bay PB DS 11 11-23 PLAN 11-23B 11-23B WP08 Plus 500ft MD AOGCC Offset Well Report 07 March, 2018 BA ER IGIHES BAT GE company AOGCC b BP BAT(ER p Anticollision Report �jUGHES a GEcom,, Company: Norm America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 11 Site Error: O.00usft Reference Well: 11-23 Well Error: O.00usft Reference Wellbore PLAN 11-23B Reference Design: 11-23B WP08 Plus 500ft MD Local Co-ordinate Reference: TVD Reference: MD Reference: Norm Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 11-23 11-238 Plan RKB @ 74.15usft (11-238 Plan RKB) 11-23B Plan RKB @ 74.15usfi (11-23B Plan RKB) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 11-23B WP08 Plus 500ft MD Fitter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria To Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic Survey Tool Program Date 3/7/2018 From To Offset Centre to (usft) (usft) Survey (Wellbore) Tool Name Description 117.15 598.15 Sperry Boss Gyro MS WRP 57.0' Copy (11 BOSS -GYRO Sperry -Sun BOSS gyro multishot 598.15 6,114.15 MWD (11-23) MWD MWD - Standard 6,114.15 6,450.0011-23B WPO8 Plus 500ft MD (PLAN 11-23 MWD MWD - Standard 6,450.00 6,880.00 11-23B WPO8 Plus 500ft MD (PLAN 11-23 BLIND Blind tlnlling 6,880.00 10,636.0011-23B WPO8 Plus 500ft MD (PLAN 11-23 MWD MWD - Standard 6,880.00 10,636.00 11-23B WP08 Plus 500ft MD (PLAN 11-23 MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 10,636.00 15,252.3411-23B WP08 Plus 500ft MID (PLAN 11-23 MWD MWD - Standard 10,636.00 15,752.34 11-23B WPOB Plus 500ft MD (PLAN 11-23 MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) Lis DS 02 Lis DS 03 PB DS 11 11-09 - 11-09 - 11-09 868.58 850.00 53.73 11 -09 -11 -09A -11-09A 869.48 850.00 53.74 11-10-11-10-11-10 565.43 550.00 54.82 11-10- 11-10A- 11-10A 565.43 550.00 54.82 11-11 - 11-11 - 11-11 586.86 575.00 172.60 11-23- 11-23- 11-23 6,568.86 6,550.00 4.81 11-23-11-23A- 11-23A 11,423.47 11,450.00 149.17 11 -23 -PLAN 11-238-11-23BWPO8 10,625.00 10,625.00 0.00 11-30-11-30-11-30 1,768.67 1,725.00 97.04 11 -30 -11 -30A -11-30A 1,768.67 1,725.00 97.04 Plan Lisburne - Plan Lisburne - Lisburne Wp 1.0 589.63 575.00 111.55 3/7/2018 2:10:27PM Page 2 of 31 COMPASS 5000 1 Build 81D AOGCC Aawmn.ma WELLBORE DETAILS: PI 11.236 160ENC9�tigUlU9N Project: PrudhoeBaY M.wkwm'. v.0 SiN: PHDSII i�—.� 11-236 nVaetimaM�ileW9lFee,aereernanNeh W.9 11-3 sram9aMfi®e 74 ,SanZFMPR) �AJ(ER Wepbom: P2Parent Wellbore 9nqn Plan:11-23BWPe9 PIu5WnD(MR1SPAN11-23B) X9®24159al-0Y9UGHESTiAD'611415 9 fd : nmpenr Go N O m m OI m m o m O m m m m m m m q J S O J J a O n m O O J O N J O G N J N J m O Easting (400 usftlin) J o V V J y yO O O O m O A m m m O O Nit o 0 o S G O J J q q A m O O o 0 a J O N OJI O O 0 0 J O O m m J O J O m O J O q O J + O O V E V O V N V m J + O O 596328 - $ - 5963200 11-23B WP08 Plus 500ft MD sffi q 5962800 11-238 WP°e P1. soon Mo $ 5962400 5962400 596M- 11-230 WPOS 5962000 59516W L2 GSA59510 5961200 L] -i5 c o $ 5961200 5960800 - 11-23 11-09 5960BO0 1L23A O 5 8000 5960900 C 595000D g000 1-09A 59600002 5959600 v-]° e 5959600 � C 5959200 1130A - '1000 5959200" U5958800 - 1`^'0 - e00o 5958800 O 5958400 nage - 11 n0 - - 5958900 C 5958000. 1182 1000 11.29A 5958000`-' 58576 00 - �0 0° 9000 n -,OA 0 OO - 5957800 I1-28: L]-2] O 5957200 - - - 1 9WO .5957200 5 95680010p0 Ip 5956800 tt-33 5955400 l80 X00 ` sa0p 5956400 o BRp 5956000 -e`� - 5955000 5955600 -- - - IPoo °dfl A� - 5955600 nay 5955200 - - -P 5955200 4000 e00. 5959800 NS w m mS mmm Go mS mSS am vo m uuu 2 u 2 S m J ma Jo m mmmmmm �m uo S S SSSSSS S S S S m oam So SS S S o mn SSSSSoSS o a m m o S S S m S S Easting (400 usftlin) Plan RKB 4g 74.15usfl (11-230 Plan RIGS) AOGCC TOP ■d mf t'S it y LB i ' IngE V: i w sPwt SRDE l3w 13 5/r w fl.YQ 10P 135111' w nIMCm BDIIw w FlMI® ISINLDL G1F YLLS4 Yvr w YDIWNIO nW Nmw ftw Yb. , 9y0.Fl > }1/r w flFll tt0g 133/r w q BDllw DOUBLE Sllf ID1pIFN 135/e w NNEm 1W 1,• w BILGED BDIIW 1lllBll IBD Nnr. IFwD CpBtan1110M INE PoR QN OP,'E OKY !IIS CISIC SPODE ISSEIBY PBWDRY ,1' w nAMDFD lm 11' w RNYfD BDIIDY f/9C ISIY Id11D6Y w N M 6012 BOP STACK (DRAFT F1AMBpX WCL InRF: Y' M PPE SFA NFSDSD TO 11E B OF m I10NBNf 0M, DBtd DM m1E INIAYIHE B,bER SFIE BEIl SIU N Ir m w IBPq 1r w Lam r uaxc Iu ounEr lO1Y a z) I] s/Y w BDDw l)2 n,vLF lY ImPSA SSAL4CAp (, G) 3' oM SN. ONIIET 1, ul r oM sIM a,lnET allot = Dont F1NBE BIBBBIB iM.. 13-5/r w s1Mlrm LYf 1s /e• w SIma mp 13.3/0' w FWIDFD BDlfdl m 1 BDP: 13 SO w INN 11012 NMI BOP 13 5/r w Slt-0F) w 13 S/Y w IWOED Barrom N/ ]-1/2' W LDtl6 Y/ Ill WDSIFR DMSBLG f - 135/ru SBDOPD 1»P 1 N (3 I1W w Sin: DULLER LaE LM 2-1/16'M FM WE r1/s' w ruxcED uvaMi DVE mw >-1/B' w FUNDED nDNSIIC f.11E WK Iw1 tBDP: 13 Ale w NDIOPIDIE BOP 13 S/D' w sID ], POP elnoff ,] !/r nBID w nDN 8.3.17 L.C.) 5 f 'Eu � �aGi e0u9EH /}3C0-030 I IIP 7207) $L P A ^351NG1 �N S_l resp=uC �PIb 6 X019 q-3CP /IB °�232��_0002 i I[- 13 t acCn.,Jf y io963 0 1 n11B33G n,905dELNN1� 9 5�3 C 1,21531 I��V,-,; A,. X 9 5/8 X I" 4 I: REF: lM'.n1]421,,I: v Op12LMIC9U698 Hyl O fMCaa.woyr o O I T T : L' V'..: _ —� is 5000 M03 2� S'i c 5000 VDD '20 Gv A, M .� .....1'. VDD 'VJ ''(4_C Af�1110�0� DV100023D07 P&A 11-23A SAFETY NOTES: WELL ANGLE> 70'@ 11274— D r f – - - -- 2184' r4--I-r2---HES FiRO SVLN SSSV Np, D -=-3.-8-1-3--1 13-3/8" CSG, 72#, L-80, D = 12.347" 2763' TOP OF 7" LNR 7008' 9-5/8" CSG, 47#, L-80, D = 8.681" 7180' Minimum ID = 2.441" @ 13061' 3-1/2" X 2-7/8" CROSSOVER DPZ 3 - LCU 10,671' MD (8,249' TVDss) GAS LFT MANDRELS ST M) WELLHEAD= CNV ACTUATOR= B_KRC KB. ELEV = -62' BF. ELEV = _ -. KOP= 1100' Nbx Angle = 101"Q 13279'i Datum MJ= 11615'1 Datumm= _ 880Y SS P&A 11-23A SAFETY NOTES: WELL ANGLE> 70'@ 11274— D r f – - - -- 2184' r4--I-r2---HES FiRO SVLN SSSV Np, D -=-3.-8-1-3--1 13-3/8" CSG, 72#, L-80, D = 12.347" 2763' TOP OF 7" LNR 7008' 9-5/8" CSG, 47#, L-80, D = 8.681" 7180' Minimum ID = 2.441" @ 13061' 3-1/2" X 2-7/8" CROSSOVER DPZ 3 - LCU 10,671' MD (8,249' TVDss) GAS LFT MANDRELS ST M) I ND I DEV I TYPE I VLV I LATCH I PORT I DATE 1 4081 3364 52 CA -TB DMY T-2 0 08/08/15 2 6571 4969 55 CA -TB DW T-2 0 08/08115 3 7820 5810 33 KBGr2-1-S DW M 0 07/13111 4 8251 6180 29 KBG-2-LS DW M 0 09/12/97 5 10876 8472 38 K3G-2-LS DFAY M 0 09/12/97 Base DPZ 1 - CM3 8,894' MD (6,690' TVDss) 4-1/2" I$ X ELMO TT NOT LOGGED 1 11932' 1 4-12" TBG, 12.6#, 13 -CR 0.0152 bpf, D = 3.958" 11038' \ T 13061'TOP OF 4-1/2"LNR\♦ \ \ \/ 14-12" LNR 12.6#, 13 -CR -80..0152 bpf. D= 3.958" I 14-1/2" SLTD LNR 12.6#. 13 -CR -80..0152 bpf. D = 3.958" I LNR, 6.5#, L-80, .0058 bpf, ID = 2.441" 1� 13092' 12-7/8" SLID LNR 6.5#. L-&1..0058 bof. D = 2.441" I PERFORATION SLAWARY REF LOG: AWS ACOUSTLOG ON 06/30/94 ANGLE AT TOP PEW: 52 Q 11126 Note: %fer to Production OB for historical pert data S¢E SFF INTERVAL I Opn/Sgz DAIS PRUDHOE BAY IUNR WELL: 11-23A PERMNo: '1940810 APINo: 50-029-21610-01 SEC 28, T11 K R15E, 1096' FSL & 364' FEL DATE REV BY I COMMENTS See Page 2 for PErtoration Data 1986 JOMINALOOIVPLETION 0728/11 MSS/PJ GLV CfO (07/13111) 12-7/8' LNR-CT. 6.5#. L-80..0058 bof. D = 2.441" I 14-1/2" PORTED JONT- 40' 1 PRUDHOE BAY IUNR WELL: 11-23A PERMNo: '1940810 APINo: 50-029-21610-01 SEC 28, T11 K R15E, 1096' FSL & 364' FEL DATE REV BY I COMMENTS DATE REV BY I COMMENTS 1986 JOMINALOOIVPLETION 0728/11 MSS/PJ GLV CfO (07/13111) 10/15195 CSIH 127112GJIMGCJO (12114112) SIS- CVEONS215 08/28/ D JA�01/12101 SET PX PLUG/GLV CrO(8/8/15) 0123101 SIS -ND IFML 11117115 TBDIJMO RESEF FLL)G (10105115) 0227/02 RWTP ICORRECMNS I I SP Exploration (Alaska) MUCV VT Cw ACTUATOR = BKR C KB. BBV = 62' BF. ELEV = I KOP= 1100' Max Angle = 101" @ 13279' Datum Mfl= 11615' DaWm TVD= 880USS L-80, D= 12.347' TOP OF 7' LNR :. L -Rn n=R RRt• 2763' 7006' 7160' Minimum ID = 2A41" @ 13061' 3-1/2" X 2-7/8" CROSSOVER 11-23A FsAFETY NOTES: WELL ANGLE> 70'@ 11274""` 2W—v184' 4-12' FES H RO SV LN SSSV MP, D = 3.813' ® GAS LFT MANDRELS 11016 XF 1101, 11038' J-[4-12• VVLEG ELMD TT NOT LOGO 11884' 7" X 4-12" TW SS HIGH ANGLE FGR i¢SV H 7400' � 13-0-6-0' 4-12"TBG,12.6#,13}CR0.0152bpf,D=3.958' 11038' ♦ 13061 ' TOPOF4-112'LN19' TLR29#,13-CR/M-80,0.0371bpf,D=8.1812153' 958' 4-1/2'LNR12.6#,13-CR-80,.0152bpf, 2� r 4-312-1'2 G' XSE2A-7L/8S"1X18-O, ,D D - = SLTD L W 12.6#, 13 -CR -80, .0152 bpf, D = 3.958' 11 13077' LMR, 12.6#, 13 -CR -80, .0152 bpf, D = 3.958- - 2-7/8' LMR 6.5#, L-80, .0058 bpf. ID = 2.441' PERFORATION SL#,WRY REF LOG: AWS ACOUSTLOG ON 06/30/94 ANGLE AT TOP PERF 52 @ 11126' Note: Refer to Production DB for historical perf data INTERVALOpn/Sgz PRLCHOE BAY UNIT WELL: 11-23A PERMrr tb: '1940810 ARM 50-029-2161001 SEC 28, TI 1N, R15E 1096' FSL & 364' FEF I ST MD TVD DEV TY IE VLV LATCH PORE DATE 0227/02 RPYTP CORRECTIONS 11 1 1 BP Exploration (Alaska) ` 1 4081 3364 52 CA -TB DW T-2 0 0&08115 2 6571 4969 55 CA -TB DMY T-2 0 08/M15 3 7820 5810 33 KBG-2-LS D" IM 0 07113/11 4 8251 6180 29 KBCr2-LS DA41' M 0 09/12/97 5 10876 8472 38 113&2 -LS DW M 0 09/12/97 11016 XF 1101, 11038' J-[4-12• VVLEG ELMD TT NOT LOGO 11884' 7" X 4-12" TW SS HIGH ANGLE FGR i¢SV H 7400' � 13-0-6-0' 4-12"TBG,12.6#,13}CR0.0152bpf,D=3.958' 11038' ♦ 13061 ' TOPOF4-112'LN19' TLR29#,13-CR/M-80,0.0371bpf,D=8.1812153' 958' 4-1/2'LNR12.6#,13-CR-80,.0152bpf, 2� r 4-312-1'2 G' XSE2A-7L/8S"1X18-O, ,D D - = SLTD L W 12.6#, 13 -CR -80, .0152 bpf, D = 3.958' 11 13077' LMR, 12.6#, 13 -CR -80, .0152 bpf, D = 3.958- - 2-7/8' LMR 6.5#, L-80, .0058 bpf. ID = 2.441' PERFORATION SL#,WRY REF LOG: AWS ACOUSTLOG ON 06/30/94 ANGLE AT TOP PERF 52 @ 11126' Note: Refer to Production DB for historical perf data INTERVALOpn/Sgz PRLCHOE BAY UNIT WELL: 11-23A PERMrr tb: '1940810 ARM 50-029-2161001 SEC 28, TI 1N, R15E 1096' FSL & 364' FEF DATE REI/ BY I 000084TS 72tPage 2 for Perforation Data 1986 ORIGINAL COMPLETION 0728/11 I MSS/ PJCJ GLV 00 (07/13/11) " SLTD LNR, 6.5#, L-80, .0058 bpf, D = 2.441' 12-7/8' LMR -CT, 6.5#, L-80, .0058 bpf, D = 2.441" I PRLCHOE BAY UNIT WELL: 11-23A PERMrr tb: '1940810 ARM 50-029-2161001 SEC 28, TI 1N, R15E 1096' FSL & 364' FEF DATE REI/ BY I 000084TS DATE I REV BY 1 00MMS4T5 1986 ORIGINAL COMPLETION 0728/11 I MSS/ PJCJ GLV 00 (07/13/11) 10/15/95 CT SIDETRACK 1227/12 BSEIJMD GLV CJO (12J14/12) 01/12/01 SIS -MAH CONVERTED TO CANVAS 0828/15 1 W.VJNUI SET PX PLt1CVGLV 00 (8/8/15) 0123/01 SI&Mfl FINAL 11/17/15 1 TBD/JMD RESET RUG (10/05/15) 0227/02 RPYTP CORRECTIONS 11 1 1 BP Exploration (Alaska) TREE= KtEVOY WELLFEAD= MCEVOY ACTUATOR = BKR C KB. El -EV = 62' BF. ELEV = O 0121/98 KOP = 1100' WX Angle = —10V @ 13279' Datum KU= 11615' Datum TVD= 8809 SS P62FORATION SL&WRY Rff LOG: AWS ACOIJSTLOG ON 06/30/94 ANGLE AT TOP P97F. 52 @ 11126 Note. Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/8' 4 11126-11130 O 0121/98 2-118' 4 11132-11136 O 0121/98 2-1/8' 4 11170-11176 O 0121/98 2-1/8' 4 11190-11194 O 01/21/98 3-318' 4 11220-11230 O 05/01/95 3-3/8' 4 11265-11275 O 05/01/95 3-318' 4 11276-11286 O 08/30/94 3-318' 4 11296-11301 O 08/30/94 NA 5 11948-12048 O 07/10/94 4-112' 32 11972-13077 SLTD 07/10/94 2-7/8' 13092-13333 SLTD 10/15/95 11-23A PRLC"OE BAY LNTT WELL: 11-23A PEFMT No. 1940810 APINo 5402321610-01 SEC28, T11N, R15E, 1096' FSL & 364' FEL DATE REV BY OOWANTS DATE REV BY COMrSETS 1986 ORIGNAL COtrPLETION 07/28/11 bT5/ PJC GLV GO (07/13/11) 10/15/95 CT SIDETRACK 1227/12 BSE/JbD GLV GO (12114/12) 01/12/01 SIS -MM CONVERTED TO CANVAS 0828/15 MGS/JMD SET PX PLUUGLV CIO (818/15) 0123/01 SIS -W FNAL 11/17/15 TBWMD RESET RUG (10/05/15) 0227/02 RN/TP CORRECTIONS BP Exploration (Alaska) TRS= WFVo) NEI-LHEAD= CNV - ACTUATOR-- — — BKR C KB. E EV = 62' BF. ELEV = _ KOP= 1100' WX Angle = _° @ Whim MD= Whim TVD = 8800SS 23B SAFETY NOTES: WELLANGLE>_°ID_'. MAX PROPOSED 11 DL S: _" @ _'. °°'CHROME TEG & LHY" 4-1/2' HES X NP, D = 3.813' 1 2763' 1 Minimum ID = " (tD TOP OF 7_LNR F—$ 19-5/8' WHIPSTOCK (Y/) t 4-1/2' TBG, 12.8#, 13 -CR .0152 bpf, D = 3.958' .0383 bpi, D = 6.276' PERFORATION SLUVARY FRE= LOG: ON ANGLE AT TOP PERF: _'@ Note: Flefer to Production DB for historical pert data 2- LNK 12.6#, 13 -CR 52 bpf, D = 3.958' (.AS I FT MAHREI_S ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 5 4 3 2 1 300'-j9-5/8' X 7' WFO LTPwfrEBACK SLEEVE& -5/8' X 7' WFO LTPwfrEBACK SLEEVE& WFD HGR V = 6.19' MLLOUf "=W (11-23B) 6450' - 4-1/2- HES X PP, D = 3.013- DATE REV BY COWElas DOTE REV BY COMMENfB 1986 ORIGINAL COMPLETION 10115195 CT SIOEf WACK _I_I_ SIDETRACK (11-238) 02/14/18 J&v BUILT PROPOSED X 4-1/2' /2' HES X 14 -1/2 -HES XN NP, IO=3.725' 1 SLEEVE & HGR o = _' ' WLEG. D = 3.958' PRUME BAY UNIT WELL 11-23B PEFW ND: '__ API No: 50029-21610-02 SEC 28. T71 K R15E 1096 FSL & 364' FEL PBU 11-23B I <== Data Input <== Data Input <== Data Input Weak point or LOT - Measured depth (ft) Weak point or LOT True vertical depth (ft) Weak point or LOT - Hole angle (deg) Weak point or LOT - Hole size (in) Weak Point Pressure or LOT - EMW (oDol 6,300' <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input 4,819' 5 .00 13.500" 12.10 of interest - Measured depth (ft) 10,636' <== Data Input of interest - True vertical depth (ft) 8,324 <== Data Input of interest - Hole angle (deg) 31.00 <== Data Input of interest - Hole size (in) 9.875" <== Data Input of interest - Pore pressure EMW (Ppa) 7.80 <== Data Input hole assembly OD (in) 8.0" <_= Data Input hole assembly length (ft) 151' <== Data Input D OD (in) 5.000" 1 <== Data Input BHA annular vol. L zone of interest (bbl/rt) U.03ZP DP annular vol. @ zone of interest (bbl/ft) 0.0704 DP annular vol. A weak point (bbl/ft) 0.1528 <== Data Input Weak point pressure (psi): Plo 3,032 psi Weak point pressure - Safety margin: Max anticipated formation pressure (psi): Prnax Pmax EMW Pf 3,032 psi 12.10 pp 3,376 psi Weak Pt to Zone of Interest distance (TVD ft): OH (TVD) 3,505' Weak Pt to Zone of Interest distance (MD ft): OH MD 4,336' Maximum influx height at the bit (TVD ft): H (TVD) 3,520' Maximum influx height at the bit (MD ft): H MD 4,106' Calc. volume of (H) around BHA: Calc. volume of (H) around drill pipe: Calc. volume that H equals @ initial shut in: V1 bha Vldp V1 N/A N/A N/A Calc. vol. that H equals @ weak point (MD ft): VWp N/A Calc. volume of Vwp @ initial shut in: V2 N/A influx height (H) extend V Loepp 3123118 Davies, Stephen F (DOA) From: Gorham, Bradley M <Bradley.Gorham@bp.com> Sent: Wednesday, March 21, 2018 7:33 AM To: Davies, Stephen F (DOA) Subject: RE: PBU 11-23 (PTD 218-092) - Question Stephen, The logging requirements on page 9, MWD/GR/RES/DEN/NEU, are accurate. Let me know if there are any other questions. Thanks, Brad Brad Gorham BP Exploration (Alaska), Inc. Drilling Engineer W:(907)564-4649 C:(907)223-9529 Bradley.Gorham@bp.com From: Davies, Stephen F (DOA) [mailto:steve.davies@alaska.gov] Sent: Tuesday, March 20, 2018 6:02 PM To: Gorham, Bradley M <Bradley.Gorham@bp.com> Subject: PBU 11-23 (PTD 218-092) - Question Bradley, I'm reviewing BP's Permit to Drill application for PBU 11-23. The logging program on page 4 states that the production hole will be logged with Dir/GR/RES/NEU, but the planned drilling program on page 9 says the BHA will have MWD/GR/RES/DEN/NEU. Which is correct? Thank you, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCQ State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviesCdalaska.gov. • Permit to Drill No. 218-029 - Coordinate Check 20 March 2018 INPUT OUTPUT Geographic, NAD27 State Plane, NAD27 5004 -Alaska 4, U.S. Feet PBU 11-23B 1/1 Latitude: 70 16 28.245 Northing/Y: 5952810.893 Longitude: 148 19 27.005 Easting/X: 707155.962 Convergence: 1 34 39.16675 ScaleFactor: 0.999948749 Remark: Corpscon v6.0.1, U.S. Army Corps of Engineers WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Date: 3 ev Well Name: PRUDHOE BAY UNIT 11-23B _ ._Program DEV Well bore seg ❑ PTD#:2180290 Company BP EXPLORATION (ALASKA) INC__ Initial Class/Type DEV / PEND GeoAres 890 Unit 11650 On/Off Shore On_ Annular Disposal ❑ Administration 17 Non riven. gas conforms to AS31.05.0300. 1_A),Q.2.A-D) . . .... . ......... . . . . NA _ _ _ ... _ _ _ _ _ _ _ _ _ _ .......... 1 Pe[miI fee attached_ _ _ _ _ _ _ _ _ _ _ _ _ _ .... NA 2 Lease number appropriate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ... _ Yes _ _ Surface Location lies within ADLO028325; Top Prod Int & TO lie within ADL0028322. 3 Unique well name and number _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes 4 Well located in a defined pool _ _ _ _ _ _ _Yes PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341 F 5 Well located proper distance from drilling unit boundary _ _ _ ..... Yes _ CO 341F. Rule 2: There shall be no restrictions as to well. spacing. except that. no pay shall be 6 Well located proper distance from other wells _ .. _ _ _ Yes _ opened in a well closer than 500 feet to the boundary of the. affected_ area. Planned well conforms to CO _ 7 Sufficient acreage available in. drilling unit _ _ _ Yes 341F, Rule 2.... 8 If deviated, is wellbore plot_ included _ _ _ _ _ _ _ _ _ _ _ _ _ ... Yes 9 Operator only affected part...... _ _ _ Yes 10 Operator hasappropriate bond in force _ _ _ Yes Appr Date 11 Permit can be issued without Conservation order_ _ _ _ _ Yes 12 Permit can be issued without administrativeapproval- _ _ _ _ - _ - _ Yes SFD 3/20/2018 13 Can permit be approved before 15-day wait.. ........ .. .... .. _ _ Yes 14 Well located within area and_strata authorized by Injection Order # (put 10# in. comments) (For_ NA 15 All wells within 114, mite-area-of review Identified (For service well only). _ _ _ _ _ _ _ _ _ _ .NA 16 Pre-produced injector; duration of pre production less than 3 months (For service well only) .. NA 18 Conductor string provided . . . . . . . . . . . . .. . .................... . . . . _ _ NA- COndoctofsetfor PBU 11-23_ Engineering 19 Surface casing protects all known USDWs .............................. . NA Surface casing set for PBU 11-23 _ 20 CMT vol adequateto circulateon conductor & surf -csg _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA. Surface casing set and fully cemented 21 CMT vol adequate to tie-in long string to surf csg _ _ _ _ NA 22 CMT will cover. all knownproductivehorizons_ ....... _ Yes _ Productive, interval will be completed with cemented production. liner and perforated 23 Casing designs adequate for C. T, B & permafrost.. _ _ _ _ _ _ Yes 24 Adequate tankage, or reserve pit _ _ _ Yes Rig has steel tanks; all waste to approved disposal wells.. _ 25 If a r"ML has a 10-403 for abandonment been approved _ _ _ _ _ Yes PTD 194-081,-Sundry 318-OT5... 26 Adequate wellbore separation proposed _ Yes _ _ Antircollision analysis complete; major risk failures:_L2,08A-Sl@surf; 11-30A-SI@surf wl tt plug 27 If diverter required, does it meet regulations _ _ NA _ ..... Appr Date 28 Drilling fluid program schematic & equip list adequate_ _ _ _ _ _ _ _ _ _ Yes Max formation pressure is 3284 psig(7.6 ppg EMW ); will drill w/8.5-11.0 ppg EMW VTL 3/21/2018 29 BOPEs,_dothey meet regulation _ _ - _ _ _ _ _ _ _ _ - _ Yes 30 BOPE_press rating appropriate; test to (put psig in comments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ MPSP is 2457 psig; will test 6OPs to 3500 psig _ _ _ _ .............. _ 31 Chokemanifold complies w/API. RP-53 (May 84).. _ _ _ _ _ _ _ _ _ _ - - - _ _ _ Yes 32 Work will occur without operation shutdown _ - . - . - . Yes 33 Is presence of H2S gas probable__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ H2S measures required 34 35 Mechanical condition of wells within AOR verified (Forservicewell only) _ _ _ _ _ _ _ ...NA Permit can be issued w/o hydrogen sulfide measures No. _ . _ . _ . _ _ _ _ DS 11 wells are H2S-bearing. H2S measures. are required. Geology 36 Data.pfesented on potential overpressure zones ...... . ... . .... . . . . . Yes Planned drilling mud program (about 6.5 — 9.0. ppg). appears adequate to control operator's forecast Appr Date 37 Seismic analysis of shallow gas. zones _ _ _ _ .. _ _ _ N-A ...... pore pressure_ gradient (about 7.6 ppg). Should higher pore pressures be encountered. SFD 3/20/2018 38 Seabed .condition survey(if off-Shore) . . .. . .. . . . .................. . . . .. NA _ _ .. _ - - BP has immediate access to nearby fluid.mixing facilities. 39 Contact name/phone for weekly Progress reports_ [exploratory only] - - - - - - - - - - - - - --- NA ....... Geologic Commissioner: S QT) Date: 3 ev Engineering Commissioner: Date C 3 "�9 !8 Public oner� C Date � �/u, � 71.1"