Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-044Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: (907) 564-4891 01/12/2023 Mr. Mel Rixse Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor through 4Q 2022. Dear Mr. Rixse, Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off with cement, corrosion inhibitor in the surface casing by conductor annulus through the end of 4Q 2022. Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement fallback during the primary surface casing by conductor cement job. The remaining void space between the top of the cement and the top of the conductor is filled with a heavier than water corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached spreadsheets include the well names, API and PTD numbers, treatment dates and volumes. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations. If you have any additional questions, please contact me at 564-4891 or oliver.sternicki@hilcorp.com. Sincerely, Oliver Sternicki Well Integrity Engineer Hilcorp North Slope, LLC By Samantha Carlisle at 3:53 pm, Jan 12, 2023 Digitally signed by Oliver Sternicki (4525) DN: cn=Oliver Sternicki (4525), ou=Users Date: 2023.01.12 14:52:49 -09'00' Oliver Sternicki (4525) DATA SUBMITTAL COMPLIANCE REPORT 1/9/2019 Permit to Drill 2160440 Well Name/No. PRUDHOE BAY UNIT 01-36 MD 13625 TVD 9119 Completion Date 7/4/2018 REQUIRED INFORMATION Mud Log No Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-23603-00-00 Completion Status 1-0I1 Current Status 1-0I1- UIC No / Samples No ✓ Directional Survey Yes v/ DATA INFORMATION List of Logs Obtained: MWD/ GR/ RES, MWD/ GR/ RES, MWD/ GR/ RES/ DEN/ NEU Well Log Information: Logi Electr Data Digital Dataset Log Log Run Type Med/Frmt Number Name Scale Media No ED C 29858 Digital Data ED C 29858 Digital Data ED C 29858 Digital Data ED C 29858 Digital Data ED C 29858 Digital Data ED C 29858 Digital Data ED C 29858 Digital Data ED C 29858 Digital Data ED C 29858 Digital Data ED C 29858 Digital Data (from Master Well Data/Logs) Interval OH I Start Stop CH Received Comments 66 13625 10/19/2018 Electronic Data Set, Filename: 01-36 _BHGE_LTK_MEM_FE Composite Drilling Data.las 10/19/2018 Electronic File: 01- 36_BHGE_LTK_2MD_Memory Drilling_Log.cgm 10/19/2018 Electronic File: 01- 36_BHGE _LTK_2TVDss_Memory Drilling_Log.cgm 10/19/2018 Electronic File: 01- 36_BHGE_LTK_5MD_Memory Drilling_Log.cgm 10/19/2018 Electronic File: 01- 36_BHGE _LTK_5TVDss_Memory Or lling_Log.cgm 10/19/2018 Electronic File: 01- 36_BHGE _ STK(6.125)Run04_5MD_Mem_10065 -13 10/19/2018 Electronic File: 01-36_BHGE_OTK- VSS_Composite Drilling Dynamics Log.cgm 10/19/2018 Electronic File: 01-36 BHGE LTK_MEM_FE Composite Drilling Data.dis 10/19/2018 Electronic File: 01- 36 BHGE LTK 21VID MEM 123- 13625—Composite Log.pdf 10/19/2018 Electronic File: 01- 36_BHGE _LTK_2TVDss_MEM_34- 9033 Composite Log.pdf AUG('C Pagel of3 Wednesday, January 9, 2019 DATA SUBMITTAL COMPLIANCE REPORT 1/9/2019 Permit to Drill 2180440 Well Name/No. PRUDHOE BAY UNIT 01-36 MD 13625 TVD 9119 Completion Date 7/4/2018 ED C 24858 Digital Data ED C 29858 Digital Data ED C 29858 Digital Data ED C 29858 Digital Data ED C 29858 Digital Data Log C 29858 Log Header Scans Well Cores/Samples Information: Name INFORMATION RECEIVED Completion Report V Production Test Information/ NA Geologic Markers/Tops Q COMPLIANCE HISTORY Completion Date: 7/4/2018 Release Date: 4/25/2018 Description Interval Start Stop Directional / Inclination Data Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-23603-00-00 Completion Status 1-0I1- Current Status 1 -OIL UIC No 10/19/2018 Electronic File: 01- 36 BHGE LTK 5MD MEM_123- 13625_Composite Log.pdf 10/19/2018 Electronic File: 01- 36 BHGE LTK_5TVDss MEM_34- 9033_Composite Log.pdf 10/19/2018 Electronic File: 01-36—BHGE—Final Survey Report.pdf 10/19/2018 Electronic File: 01-36—BHGE—Final Survey Report.txt 10/19/2018 Electronic File: 01- 36_BHGE_Final_Survey_Listing.csv 0 0 2180440 PRUDHOE BAY UNIT 01-36 LOG Mechanical Integrity Test Information Y / NA Daily Operations Summary YQ Date Comments HEADERS Sample Set Sent Received Number Comments Mud Logs, Image Files, Digital Data Y Composite Logs, Image, Data Files 0 Cuttings Samples Y /6A Core Chips Y / Core Photographs Y / �A Laboratory Analyses Y / NA AOGCC Page 2 of 3 Wednesday, January 9, 2019 DATA SUBMITTAL COMPLIANCE REPORT 1/912019 Permit to Drill 2180440 Well Narri PRUDHOE BAY UNIT 01-36 Operator BP EXPLORATION (ALASKA) INC. MD 13625 TVD 9119 Completion Date 7/4/2018 Completion Status 1-0I1- Current Status 1-011- Comments: -OILComments: Compliance Reviewed By: __- Date: API No. 50-029-23603.00-00 UIC No AOGCC Page 3 of 3 Wednesday, January 9, 2019 BAIUGHES FINAL CD/DVD FINAL PRE LIM LOGS PRINT S CGM, Final Surveys) (Compass) # OF PRINTS9 a GE company # OF COPIES # OF COPIES 1# OF COPIES COMPANY BP Exploration Alaska Inc. WELL NAME 01-36 FIELD Prudhoe Bay Unit 900 E. Benson Blvd. COUNTY PRUDHOE BAY BHI DISTRICT Alaska :Attn: Ricky Elgarico AUTHORIZED BY Paul Canimres EMAIL Paul.Canizares(a).bhcie.com STATUS Final Replacement: No DISTRIBUTION LIST Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1112-11 900 E. Benson Blvd. Anchorage, Alaska 99508 or LOG TYPE GR-RES-DEN-NEU STK:Image Log LOG DATE July 1, 2018 TODAYS DATE October 16, 2018 Revision Details: Rev. Requested by: 218044 25850 FIELD/ LL FINAL CD/DVD FINAL PRE LIM LOGS (las, dlis, PDF, META, SURVEY REPORT S CGM, Final Surveys) (Compass) # OF PRINTS9 Vr VKIN # OF COPIES # OF COPIES 1# OF COPIES COMPANY ADDRESS (FEDEX MINOT DELVER TO P.O. BOX) LOG PERSON ATTENTION V iy IBP North Slope B C :EOA, PBOC, PRB-20 (Office 109) :D&C Wells Project Aidesm Atm: Benda Chnsaker & Peggy O'Neil 900 E. Benson Blvd. 'Anchorage, Alaska 99508 2 ConocoPhillips Alaskaleec. C :Attn: Ricky Elgarico AT0 3-344 '700 G Street 3 iEX%onMobil, Alaslm :Ann: Lynda M. Yaskell and/or Lisa Boggs :3201 C Street, Suite 505 :Anchorage, AK 99503 e of Alaska - AOGCC u Named Resources Teehnition W. 7th Ave, Suite 100 horage, Alaska 99501 b 4 5!DNR-Division of Oil &Car "• I U I U I l I U I U I Attn: Garret BTOWD 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 ** Stamp "confidential" on a6 material deliver to DNR 6:BP Exploration (Alaska) Inc. : Petrotechnical Data Center, LR2-1 :900 E. Benson Blvd. Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 0 4 0 F STATE OF ALASKA 4LASKA OIL AND GAS CONSERVATION COMMISC'^N WELL /MPLETION OR RECOMPLETION REPO AND LOG REGEMU 1a. Well Status: Oil 0 Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 20AAC 25.705 20AAC 25.110 GINJ ❑ WINJ ❑ WAG ❑ WOSPL ❑ No. of Completions: One lb. Well Class: Developmerd'e [i�01 51 Ll '-gi1,,,f a'Ph Te V Service fj Sretrgraphlc Test ❑ 2. Operator Name: BP Exploration (Alaska), Inc 6. Date Comp., Susp., or Abend.: 7/4/2018 14. Permit to Drill Number/Sundry 218-044 3. Address: P.O. Box 196612 Anchorage, AK 99519-0612 7. Date Spudded: 6/15/2018 15. API Number: 50-029.23603-00-00 ' 4a. Location of Well (Governmental Section): Surface: 4646 FSL, 3841' FEL, Sec. 08, T10N, RISE, UM Top of Productive Interval: 1150' FSL, 550' FEL, Sec. 08, T10N, RISE, UM Total Depth: 107' FNL, 253V FWL, Sec. 16, T10N, RISE, UM S. Date TO Reached: 7/1/2018 16. Well Name and Number. PBU01-36 ' 9 Ref Elevations KB 88 70 GL 40.00 BF 45.10 17. Field/Pool(s): PRUDHOE BAY, PRUDHOE OIL 10. Plug Back Depth(MD/TVD): -13528'/ 9063' ' 18, Property Designation: ADL 028329. 028328 & 028331 41b. 41b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 698768 • y- 5940291 Zone - ASP 4 TPI: x- 702161 y- 5936884 Zone - ASP 4 Total Depth'. x- 705285 y- 5935712 Zone - ASP 4 11, Total Depth (MD/TVD): 13625' / 9119' • 19. DNR Approval Number 79-179 12. SSSV Depth (MD/TVD): None 20 Thickness of Permafrost MDrrVD: 2044'11973' 5. Directional or Inclination Survey: Yes 0 (attached) No ❑ Submit electronic and printed information per 20 AAC 25.050 13 Water Depth, if Offshore: N/A (ft MSL) 21. Re-dnll/Lateral Tap W radar MDRVD: N/A 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, rasing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD/GR/RES, MWD/GR/RES, MWD/GR/RES / DEN /NEU 23. CASING, LINER AND CEMENTING RECORD CASING Wr. PERGRADE FT. SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" 129.46# x-56 48' 128' 48' 128' 42" 18 yds Concrete 10-3/4" 45.5# Lau 47' 3840' 47' 3464' 13-12" 2299 sx U teCrete, 257 sx Class'G' T' 26# L -8o 44' 10061' 44' 8674' 9-7/8" 783 sx UteCiete, 165 sx Class'G' 4-1/2" 12.6# Bass 9890' 13623' 8543' 9118' 6-1/8" 413 sx Class'G' 24. Open to production or injection? Yes 0 ' No ❑ If Yes, list each interval open (MDr VD of Top and Bottom; Perforation Size and Number; Date Perfd): 2-7/8" Gun Diameter, 6 sof 7/3/2018 10070'- 10100' 8681'- 8703' 10915'- 11230' 8708'- 8705' - 25. TUBING RECORD GRADE DEPTH SET (MD) PACKER SET (MD/TV 4-1/2" 12.6# 13Cr85 9898' 9738'/ 8427' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic framring used during completion? Yes ❑ No 0 Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 2200' Freeze Protect w/ 75 Bbls Diesel 27. PRODUCTION TEST Date First Production: July 24, 2018 Method of Operation (Flowing, gas lift, etc): Flaring Data of Test: 727/18 Hours Tested: Production for Test Period y DI4Bbl: 432 Gov -MCF: 108904I Wa[er-Bbl: Choke Sive 85 Gas -Oil Ratio:14 25240 Floc Tubing 257 Press Caning Press: 640 Calculated 24 Hour Rate y Oil -Bbl: 740 Gas -MCF: 18668 Water -Bbl: 72 Oil Gravity- API (cor): WA Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only RBD UG 0 28. CORE DATA ! Conventional Core(s) Yes ❑ No 0 Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervais cored (MD+TVD of top and bottom of each), and summarize utnology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29, GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top 42' 42' Well Tested? Yes ❑ No 0 , Permafrost - Base 2086' 2015' If yes, list intervals and formations tested, bnefly summarizing test results. Attach Tap of Productive Interval 10060' 8673' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Ugnu 5320' 4725' WestSalk 7072' 6222' Colville Mudstone 7621' 6691' HRZ 9691' 8391' Base of HRZ 9813' 8485' LCU 9852' 8514' Sag River 10060' 8673' Shublik 10103' 6705' Sadlerochit-Zone 4 10228' 8782' Shublik (Invert) 10625' 8785' Sag River 10885' 8711' Shublik (Revert) 12786' 8722' Sadlerochit-Zone 4 13034' 8799' CGL - Zone 3 13417' 9000' Base of CGL - Zone 2 13506' 9051' Formation at total depth: Zone 2 13506' 9051' 31. List of Attachments: LOT / FIT Summary, Summary of Daily Drilling Reports, Survey, Cement Reports, As -Built, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070, 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Sperry, Nathan Authorized Title: SIM S Phlist Contact Email: Nathan.SperryQbp.com Authorized Signature: a : �� $ Contact Phone: 907-564-4258 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item la. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 11b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Forth 10-407 Revised 512017 Submit ORIGINAL Only E= (7W WELLHEAD= FMC ACTUATOR= OKB. ELEV = 8870' BF. —8"= KOP= ZO" COND, 128' Max Angle = 110' Q 10718' 129.46 #, X-56, Datum MD= 1321T D=18.770' Datura TVD = 8800'SS KBG2 4" CSG, 45.5#, L-80 BTC, D - 9.950' 3840 Minimum ID = 3.725" @ 9842' 4-1/2" HES XN NIPPLE TEDTOPOFCEMENT(06/25/18) 1-1 4894' TBG, 12.6#, 13CR-85 VAM TOP, I 9898' bpf, D = 3.958' TOP HC, D =6276' H 10061' PERFORATION SUkLAARY REF LOG: ON_/_/_ ANGLEATTOP F9iF:42' @ 1007U Note: Refer to Reduction DB for historical perf data SIZES PF SF INTERVAL Opn/Sgz SHOT SOZ 2-7/8' KBG2 10 070'- 10100' O 07/03/18 2-718' 6 10915'- 11230' O 07/03/18 jPBTD(NOT TAGGED) 1 13528' 2" LNR 12.6#, 13CR-85 VAM TOP,13623' 52 bpf, D = 3.958' 01-36 MA Fc -S: 118E@Y70354ELL ACHROME TBG&LNR 14-1/2" F6 X NP, D = 3.813" I ST MD JIVDIDEVITYPE 07106118 P-272 INITIAL WELLBORE VLV LATCH PORT DATE 8 4046 3641 32 KBG2 DOME BK 16 07/15118 7 6320 5582 31 KGB2 SO BK 20 07/15/18 6 6977 6144 31 KGB2 DMY BK 0 07104/18 5 7509 6598 31 KGB2 DMY BK 0 07/04/18 4 8041 7053 31 KGB2 OW BK 0 07104/18 3 8573 7508 r31 KGB2 OW BK 0 07104/18 2 9188 8007 40 KGB2 OW BK 0 07/04/18 1 9635 8351 40 KGB21 Dk1Y I BK 1 0 07/04/18 971 —j4-1/2' F6 X NP, D = 3.813' 07106118 P-272 INITIAL WELLBORE 07/09/18 JAfJ ORLG HO CORREMNS 9738' 7- X 4-1/2' HES TM PKR D 07/17/18 ZV/JMD GLV OO(07/15/18) 977 4-1/2'HES X W. D=3.813' 9842' J 9890' I 9910' I DATE REV BY OOMYBJTS DATE REV BY COWENTS 07106118 P-272 INITIAL WELLBORE 07/09/18 JAfJ ORLG HO CORREMNS 07/10/18 NS/JMD RNALODEAPPROVAL 07/17/18 ZV/JMD GLV OO(07/15/18) HGR D = 4.420" PRLUHDE BAY ABJT WELL 101-36 PERW No: 218-044 AR No: 50-029-23608-00 1`10N, R15F 4649 FSL & 3840' FEL BP Exploration (Alaska) II ___J■JE 01-04DRILL SITE 1 MON. 1-Bo1-osI TFMS PDRILL SITE 1 Dv %01-36 DRILL SITE 1 VICINITY MAP SCALE: 1-= 800' Sol -06 OFq �P� ,....,. Aster moi,: .. 9 GRAPHIC SCALE LEGEND * , 91h . 0 50 100 200 �}} AS -BUILT CONDUCTOR •••. ''•°°°°°••° • /••'•• ( IN FEET) ■ EXISTING WELL 1 inch . 100 Tl. 0 CONTROL MONUMENT A, Imoth Bamharl jS 1 200 9,}i� NOTES: 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD27. (EPSG:26734) 2. GEODETIC POSITIONS ARE NAO27. (EPSG:4267) 3. BEARINGS AND DISTANCES SHOWN ARE ALASKA STATE PLANE GRID. 4. DRILL SITE I AVERAGE SCALE FACTOR IS: 0.9999443. 5. BASIS OF VERTICAL CONTROL IS DRILL SITE 1, 2014 WELL BORE SUBSIDENCE STUDY FOR WELL 1-05 BASE FLANGE ELEVATION, EL 43.01. 6. DATE OF SURVEY: APRIL 27, 2018. 7. REFERENCE FIELD BOOK: NS18-10 POS. 51-53. B. ESTIMATED RELATIVE ACCURACY (THIRD ORDER): BASELINE DISTANCE 1:13,254 BASELINE AZIMUTH: 2155 ALLOWABLE VERTICAL CLOSURE 20.01' 9. NAD27 COORDINATES DERIVED USING TRIMBLE BUSINESS CENTER-HCE, VER. 3.92. 10. GEODETIC COORDINATES DERIVED USING AUTODESK AUTOCAO CIVIL 3D 2018, VER. 12.0.842.0. SURVEYORS CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS -BUILT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF APRIL 27, 2018. BASIS OF COORDINATES: HELD COORDINATES OF RECORD DRILL SITE 1 MONUMENT 1-9 Y= 5,940,954.74 N= (-)1000.00 X= 697,448.73 E= 0.00 NA027, ASP, ZONE 4 DSI PLANT DESCRIPTION: 8'x8' STEEL PLATE WELDED ONTO 3- DIA. STEEL PIPE, 2.OFT2 ABOVE TUNDRA GRADE, HE CORNER DRILL SITE 1 GRAVEL PAD. MONUMENT IS IN FAIR CONDITION. LOCATED WITHIN PROTRACTED SECTION 8, T. 10 N., R. 15 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC SECTION PAD CELLAR BASE NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) OFFSETS ELEVATION BOX EL. FLANGE EL. 01-36 I X= 51940,291.13 698,768.12 IE= 1,149.60 1148'23'40.774" I 148.3946594' I 3,841' FEL I FSL 39.3' I 40.0' I N/A aAcoes bI� bell RAPER oAlo p 05 Ot to oRxrwc FRBI8 DS2 01 PRUDHOE BAY, ALASKA coN AECCSB2 m R1xign mum srnw IME orrsr ,u JOB so A ncI® EOA DRILL SITE 1, WELL 01-36 O1 °A fit Imo' A " L[ " A °`°' I- . too CONDUCTOR AS -BUILT Page 1 of 1 BP AMERICA LOT / FIT Summary Well Name: 01-36 Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD -Ft) (TVD -Ft) (pp) (psi) (BHP) (psi) (pg) 06/21/18 LOT 3,840.00 3,464.06 9.90 860.00 2,643.03 14.68 06/26/18 FIT 10,061.00 8,674.09 8.50 880.00 4,711.41 10.45 Page 1 of 1 North America - ALASKA - BP Operation Summary Report Page 1 of 31 Common Well Name: 01-36 - 16:30 4.50 AFE No Event Type. DRL- ONSHORE (DON) Start Date. 6/132018 End Date: 7/1/2018 X3-01BYT-C: (7,883,309 00 ) Protect: PBU Site: 01 ------- Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00 OOPM Rig Release: 7/8/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ _ (usft) _ 6/13/2018 09:00 - 12:00 3.00 MOB P PRE GENERAL RIG DOWN OPERATIONS 12:00 - 16:30 4.50 MOB P 16:30 - 00:00 7.50 MOB N 6/14/2018 00:00 - 00:30 0.50 MOB N 00:30 - 01:30 1.00 MOB N 01:30 - 0330 2.00 MOB P 03:30 - 06:00 2.50 MOB P THROUGHOUT RIG - SKID CATTLE CHUTE AND RIG FLOOR INTO MOVE POSITION - LOWER MAST TO HEADACHE RACK PULL MODULES OFF WELL AND STAGE AT PAD ENTRANCE PRE MOVE PARKER 272 FROM DS07 TOWARDS DS01 - MOVE ALL MODULES TOGETHER - TEMPORARY HALT MOVE ON EAST DOCK 'ROAD BETWEEN DS02 AND C -PAD ENTRANCE PRE CODE 8 NON-PRODUCTIVE TIME: HALT RIG MOVE TO REPAIR TIRE ON DRILL MODULE - JACK UP DRILL MODULE AND REMOVE BLAST DOOR - REMOVE FLAT TIRE AND INSPECT AXELAND HYDRAULIC SYSTEMS - ASSIST PEAK TIRE SHOP MECHANIC IN INSTALLING NEW TIRE INSPECT ALL TIRES IN MODULE AND VERIFY TIRE PRESSURES PRE . CODE 8 NON-PRODUCTIVE TIME: FINISH INSPECTING DRILL MOD CARRIER BAY PRIOR TO RECOMMENCING RIG MOVE - INSPECT ALL HYDRAULIC LINES AND EQUIPMENT INSPECT ALL TIRES - VERIFYALL TOOLS ACCOUNTED FOR AND PUTAWAY - FUNCTION TEST TIRES AND MOVING SYSTEM. PRE WAIT FOR SECURITY TO ARRIVE TO RECOMMENCE RIG MOVE TO OS01 SIMOPS: - INSPECT OTHER MODULES PRE MOVE RIG MODULES TO DS01 - ALL MODULES ON LOCATION BY 03:30 PRE STAGE MODULES OFF TO THE SIDE. SPOT DUMMY WELLHOUSE OVER WELL SIMOPS: - RE -INSTALL BLAST DOOR ON DRILL MODULE - LOAD WELLHEAD EQUIPMENTAND RISERS IN BOP DECK Printed 7/312018 9:01-12AM 'All depths reported in Drillers Depths' North America - ALASKA - B P Operation Summary Report Common Well Name. 01-36 Event Type: DRL-ONSHORE (DON) Stan Date: 6/13/2018 End Date: 7/1/2018 Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date rime: 6/15/2018 12:00:OOPM Active datum: 01-36 ACTUAL Def @j88.70usft (above Mean Sea Level) Date From - To Ars Task Code NPT Total Depth . _ (hr)_- _ (usft) 06:00 - 10:30 4.50 MOB P 129.00 10:30 - 11:00 0.50 RIGU P 129.00 11:00 - 12:00 1.00 RIGU P 129.00 12:00 - 17:00 5.00 RIGU P 129.00 17:00 - 00:00 7.00 BOPSUR P 129.00 Page 2 of 31 AFE No X3-018YT-C. (7,883,309.00 ) Rig Release: 7/6/2018 BPUOI: USA00006193 Phase Description of Operations PRE SPOT DRILL MODULE OVER WELL 36. MATE MUD MODULE AND UTILITY MODULE UP AGAINST DRILL MODULE -SHIM AND SECURE MODULES GENERALNOTES: - 20" CONDUCTOR INSTALLED PRE -RIG -42" HOLE DRILLED TO 80' BELOW GROUND LEVEL. PIPE RUN TO 79' AND CEMENTED. LANDING RING WELDED ON TOP OF 'CONDUCTOR. '- WELL HANDOVER CERTIFICATE OPEN WITH GOO - ORB PLACEMENT VERIFICATION COMPLETED BY SENIOR WSL ,-ANTI-COLLISION SCAN LAST RUN 5/30/18 - 112S PROCEDURES IN PLACE FOR DS01 H2S PAD - WELL MONITORING MATRIX FOR HOLE SECTION SIGNED AND POSTED WITH _ BARRIER BOARD PRE RAISE MAST _ - HOOKLOAD OFF RACK = 550 KLBS PRE SKID RIG FLOOR. MOVE CATTLE CHUTE INTO DRILLING POSITION AND RAISE PIPE CAT. SET ROOF WALKWAYS. - PRE -SPUD MEETING HELD WITH WOODS' CREW PRE GENERAL RIG UP OPERATIONS: - RIG UP RIG FLOOR EQUIPMENTAND INTERCONNECTS -BRIDLE DOWN BLOCKSAND RIG UP TO TOP DRIVE - LOAD FRESHWATER INTO PITS FOR CALIBRATION - SPOT CUTTINGS BOX - SET LOW PRESSURE RISERS ON CONDUCTOR - PERFORM RIG EMERGENCY SHUTDOWN FUNCTION TEST —ACCEPT RIG AT 16:00" PRE NIPPLE UP 21-1/4" DIVERTER SYSTEM - INSTALL RISERS, KNIFE VALVE AND DIVERTER ANNULAR - INSTALL FLOW NIPPLE, FLOW LINE AND HOOK UP HOLE FILL LINES - CONNECT ACCUMULATOR LINES AND FUNCTION TESTANNULAR / KNIFE VALVE - MAKE UP STAND OF 5" HWDP AND TAG FILL IN CONDUCTOR AT 123' MD SIMOPS: - QUADCO REP ON RIG TO CALIBRATE PITS, SENSORS AND GASWATCH - MOBILIZE SHORT BHA COMPONENTS TO RIG FLOOR - STRAP AND TEST BHA COMPONENTS IN PIPE SHED Printed 7/31/2018 9:01:12AM •AII depths reported in Drillers Depths* North America - ALASKA- BP Operation Summary Report Common Well Name: 01-36 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 6/13/2018 End Date: 7/1/2018 X3-018YT-C: l7,883,309 00 ) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12.00 OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Det @88.70usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth (hr) (usft) 6/15/2018 00:00 - 00:30 0.50 BOPSUR P 129.00 00:30 - 05:00 4.50 BOPSUR P 129.00 05:00 - 05:30 0.50 BOPSUR P 129.00 05:30 - 06:00 0.50 BOPSUR P 129.00 06:00 - 10:30 4.50 DRILL P 129.00 10:30 - 11:00 0.50 BOPSUR P 129.00 11:00 - 12:00 1.00 RIGU P 129.00 12:00 - 12:30 0.50 DRILL P 190.00 12:30 - 13:30 1.00 DRILL P 188.00 13:30 - 00:00 10.50 DRILL P 900.00 Page 3 of 31 Phase Description of Operations PRE FINISH NIPPLING UP DIVERTER - VERIFY BOLTS TORQED ON DIVERTER - MEASURE RKB DISTANCES AND SEND IN DIRECTIONAL FORM PRE FUNCTION TEST DIVERTER AND ACCUMULATER SYSTEM - ANNULAR CLOSE TIME = 42 SEC, KNIFE VALVE OPEN TIME = 34 SEC - TEST FIRE AND GAS ALARMS - TEST PVT AND FLOW SHOW ALARMS - FILL STACKAND VERIFY NO LEAKS -ALL TESTS WITNESSED BY AOGCC REPRESENTATIVE, GUY COOK SIMOPS: - MAKE UP 5" HWDP STANDS OFFLINE PRE .PERFORM H2$/ RIG EVACUATION DRILLAND AAR WITH RIG CREWAND THIRD PARTIES PRE HOLD PRE -SPUD MEETING WITH BUCKLER'S CREW AND THIRD PARTIES. PRE MAKE UPAND RUN IN THE HOLE WITH BHA #1, 13-1/2" MOTOR ASSEMBLY - PRESSURE TEST SURFACE LINES TO 3500 PSI PRIOR TO PICKING UP BHA - MAKE UP HUGHES VM3 MILLTOOTH BIT, 8" MOTOR WITH 1.5°AKO, STABILIZER AND UBO AND ONE DRILL COLLAR SIMOPS: - BEGIN RIGGING UP E -LINE AND GYRODATA FOR GYRO SURVEYS PRE HELD D3 DRILL (DIVERTER DRILL) AND AAR WITH RIG CREW AND THIRD PARTIES PRE RIG UP SLB E -LINE AND GYRODATA SURF SPUD WELLAND DRILL 13-1/2" SURFACE HOLE SECTION FROM 126' MD TO 190' MD - 500 GPM, 670 PSI, 40 RPM, 1 KFT-LBS TORQUE, 5 KLBS WOB - GYRO EVERY <100' PER WELL PROGRAM SURF STAND BACK I STAND OF HWDP AND MAKE UP THE REMAINDER OF THE SURFACE HOLE BHA TO 188' MD SURF DIRECTIONAL DRILL 13-1/2" SURFACE HOLE FROM 190' MD TO 900' MO (710' IN 10.5 HRS = 67.6 FPH WITH CONNECTIONS 8 SURVEYS). - 50-350 FPH INSTANTANEOUS ROP - 500 GPM, 1064 PSI ON BOTTOM, 888 PSI OFF BOTTOM - 40 RPM WHEN ROTATING, 3 KFT-LBS TORQUE ON BOTTOM, 1 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS WOB - WIPE 30' WITH AFTER DRILLING STAND DOWN PRIOR TO GYRO SURVEYS - GYRO SURVEY EVERY 90' MD TO 833' MD AFTER 3RD MATCHING SURVEY - MW IN/OUT = 8.7 / 8.7 PPG - NO LOSSES - FLOW LINE TEMP = 58' F - GEOLOGY TOPS - G1 = 516' MD - FLOW PADDLE BYPASSED PER PTD. GASWATCH NOT INSTALLED DUE TO GRAVEL Printed 7/31/2018 9:01:12AM *Ali depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Common Well Name: 01-36 Event Type: DRL- ONSHORE (DON) Start Date: 6/132018 End Date: 7/1/2018 AFE No X3-018YT-C: (7,883,309.00) Page 4 of 31 Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Daterrime. 6/152018 12:00:OOPM Rig Release: 7/6/2018 Rig Contractor. PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88 70usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usR) 6/162018 00:00 - 06:00 6.00 DRILL P 1,150.00 SURF DIRECTIONAL DRILL 13-12" SURFACE HOLE FROM 900' MD TO 1150' MD, (250'N 6.0 HRS = 41.7 FPH WITH CONNECTIONS & SURVEYS). - 90-200 FPH INSTANTANEOUS ROP -500 GPM, 1064 PSI ON BOTTOM, 888 PSI OFF ,BOTTOM -40 RPM WHEN ROTATING, 8 KFT-LBS 'TORQUE ON BOTTOM, 2 KFT-LBS TORQUE OFF BOTTOM, 20 KLBS WOB -SURVEY EVERY STAND -MW IN/OUT =8.7/8.7 PPG '- NO LOSSES - FLOW LINE TEMP = 58- F - FLOW PADDLE INSTALLED AT 1000' MD MWD SURVEY FAILED SPERRY QC AT 1018' MD BIT DEPTH. DROP GYRO SURVEY AND DISCUSS WITH ODE. SIMOPS: BUILD STANDS OF 5" DRILL PIPE OFF-LINE 0600 - 12'.00 6.00 DRILL P 1,684.00 SURF 'DIRECTIONAL DRILL 13-12" SURFACE HOLE FROM 11 50'MD TO 1684' MD (1643' TVD), (534' IN 6.0 HRS= 89.0 FPH WITH CONNECTIONS & SURVEYS). - 90-200 FPH INSTANTANEOUS ROP - 500 GPM, 1207 PSI ON BOTTOM, 1070 PSI OFFBOTTOM - 40 RPM WHEN ROTATING, 4.5 KFT-LBS TORQUE ON BOTTOM, 2 KFT-LBS TORQUE OFF BOTTOM, 18-28 KLBS WOB - SURVEY EVERY STAND - MW IN/OUT = 8.7 / 8.7 PPG -NO LOSSES - FLOW LINE TEMP = 61* F MWD SURVEYS CLEANED UP AND PASSED QC AFTER 1018' MD. NO ADDITIONALAC SCAN REQUIRED. RELEASE E -LINE AND GYRO DATAAFTER 1400' MD. SIMOPS: - BUILD STANDS OF 5" DRILL PIPE OFF-LINE Printed 7/31/2018 9'.O1 12AM *All depths reported in Drillers Depths* North America - ALASKA - BP Operation Summary Report Page 5 of 31 Common Well Name: 01-36 AFE No Event Type: DRL- ONSHORE (DON) Start Date. 6/13/2018 End Date: 7/1/2018 X3-018YT-C: (7,883,309,00) Project PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/time. 6/15/2018 12:00:OOPM Rig Release: 7/6/2018 Rig Contractor. PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Era Task Code NPT Total Depth Phase Description of Operations __ - (hr) (usft) 12:00 - 20:30 8.50 DRILL P 2,344.00 SURF DIRECTIONAL DRILL 13-1/2" SURFACE HOLE FROM 1684' MD TO 2344' MD (2242' TVD), (550' IN 6.0 HRS = 64.7 FPH WITH CONNECTIONS 8 SURVEYS). - 90-200 FPH INSTANTANEOUS ROP - 525 GPM, 1375 PSI ON BOTTOM, 1220 PSI OFF BOTTOM -40 RPM WHEN ROTATING, 7 KFT-LBS TORQUE ON BOTTOM, 4 KFT-LBS TORQUE OFF BOTTOM, 20-35 KLBS WOB - SURVEY EVERY STAND MW IN/OUT =8.9/8.9 PPG - NO LOSSES OBSERVED WHILE DRILLING - FLOW LINE TEMP = 61- F UNABLE TO GET DESIRED BUILD RATES THROUGH PERMAFROST (-1000' TO 2086' MD). DRILLED 260' PAST BPRM, 2086' MD (2015' TVD) PRIOR TO PERFORMING WIPER TRIP TO CHECK MOTOR YIELD AND VERIFY THAT DIRECTIONAL ISSUES EXPERIENCED THROUGH PERMAFROST WHERE NOT -RELATED TO MOTOR/ BIT ASSEMBLY. FIRST . 3 SURVEYS AFTER EXITING PERMAFROST 'YIELDED EXPECTED DLS (°/100) OF 1.99, 3.73, 2.14. BASED ON SURVEYS DECISION MADE TO FOLLOW WELL PROGRAM AND JUST j PERFORM WIPER TRIP TO TOP OF BHA. SIMOPS: _ _ _ _ _ _ .-BUILD STANDS OF 5"_DRILL_PIPE OFF-LINE 20:30 - 21:30 1.00 DRILL P 2,344.00 SURF _ CIRCULATE 1x BOTTOMS UP PRIOR TO PERFORMING WIPER TRIP TO TOP OF BHA -525 GPM, 1220 PSI _ - 40 RPM, 4 KFT-LBS TORQUE 21:30 - 00:00 2.50 DRILL P 2,344.00 SURF PERFORM WIPER TRIP FROM 2344' MD TO 927' MD - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM: WELL STATIC - PU 124 KLBS, SO 95 KLBS AT 2346' MD ATTEMPT TO PULL ON ELEVATORS AND PULLED TIGHT AT 2344' MD WITH 40-45 KLBS OVER PULL SEVERAL TIMES. BACKREAM FROM 2346' MD TO 1851' MD (5 STANDS) - 500 GPM, 1120 PSI -40 RPMS, 4 KFT-LBS TORQUE RE -ORIENT TOOLFACE HIGH -SIDE AND PULL ON ELEVATORS FROM 1851' MD TO 927' MD 6/172018 00:00 - 01:00 1.00 DRILL P 2,344.00 SURF RUN IN THE HOLE ON ELEVATORS AFTER PERFORMING WIPER TRIP TO TOP OF BHA, FROM 92T MD TO 2156' MD - PU 118 KLBS, SO 92 KLBS AT 927' MD - ORIENT TOOLFACE HIGH -SIDE PRIOR TO RUNNING IN - MUD WEIGHT IN/OUT = 8.9 PPG Printed 7/312018 9:01:12AM 'All depths reported in Drillers Depths` Printed 7/31/2018 9:01:12AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 6 of 31 Operation Summary Report Common Well Name: 0146 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 6/13/2018 End Date: 7/1/2018 X3-018YT-C'. (7,883,309 00 ) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00:OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) - __._ _. (usft) 01:00 - 03:30 2.50 DRILL P 2,344.00 SURF ENCOUNTER TIGHT HOLEAND WORK DOWN FROM 2158' MD TO 2344' MD WASH DOWN FROM 2156' MD TO 2250' MO - 500 GPM, 989 PSI TAG HARD AT 2250' MD AND ATTEMPT TO WORK THROUGH UTILIZING STEPS OUTLINED IN WELL PROGRAM -SET DOWN ALL AVAILABLE WEIGHT AND ATTEMPT TO WORK THROUGH MULTIPLE TIMES -RE-ORIENTTOOLFACE HIGH -SIDE REDUCE FLOW RATE TO 100 GPM AND ATTEMPT TO WORK THROUGH WITH NO SUCESS - ROTATE AT 20 RPM WITH 100 GPM AND WORK PIPE WITH ALLAVAILABLE WEIGHT ' DOWN TO 2275' MD '- DISCUSS WITH ODE AND SR. WSL - RE -ORIENT TOOLFACE HIGH -SIDE AND WASH DOWN AT FULL DRILLING RATE TO _ BOTTOM AT 2344' MD 03:30 - 12:00 8.50 DRILL P 3,201.00 SURF 'DIRECTIONAL DRILL 13-1/2" SURFACE HOLE THROUGH THE SV FORMATIONS FROM 2344' MD TO 3201' MD (2935' TVD), (857' IN 8.5 HRS = .100.8 FPH WITH CONNECTIONS 8 SURVEYS). - 550 GPM, 1800 PSI ON BOTTOM, 1700 PSI OFF BOTTOM - 60 RPM WHEN ROTATING, 8 KFT-LBS TORQUE ON BOTTOM, 6 KFT-LBS TORQUE OFF BOTTOM, 20-30 KLBS WOB - PU 157 KLBS, SO 110 KLBS, ROT 125 KLBS AT 3200' MD - SURVEY EVERY STAND (-90') - MW IN/OUT = 9.0 / 9.0 PPG - NO LOSSES OBSERVED WHILE DRILLING 12:00 - 17:30 5.50 DRILL P 3,851.00 SURF DIRECTIONAL DRILL 13-1/2" SURFACE HOLE THROUGH SV FORMATION FROM 3201' MD TO HOLE SECTION TD AT 3851' MD, 3473' TVD, (650' IN 5.5 HRS = 118.2 FPH WITH CONNECTIONS 8 SURVEYS). - 600 GPM, 1829 PSI ON BOTTOM, 1634 PSI OFF BOTTOM -60 RPM WHEN ROTATING, 10 KFT-LBS TORQUE ON BOTTOM, 6 KFT-LBS TORQUE OFF BOTTOM, 20-30 KLBS WOB - PU 180 KLBS, SO 115 KLBS, ROT 138 KLBS AT 3851' MD - SURVEY EVERY STAND (^90') - MW IN/OUT = 9.0 19.0 PPG - NO LOSSES OBSERVED WHILE DRILLING 17:30 - 21:00 3.50 DRILL P 3,851.00 SURF CIRCULATE HOLE CLEAN WITH 3x BOTTOMS UPSTROKES - 650 GPM, 1857 PSI, 70 RPM, 7 KFT-LBS TORQUE, - RACK BACK STAND EVERY 1/2 HOUR TO 3201' MD - FLOWCHECK WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM Printed 7/31/2018 9:01:12AM 'All depths reported in Drillers Depths' North America - ALASKA - B P Operation Summary Report Page 7 of 31 Common Well Name: 01-36 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 6/13/2018 End Date: 7/1/2018 X3-018YT-C: (7,883,309.00) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12.00:OOPM Rig Release: 7/8/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Alive datum: 01-35 ACTUAL Der @88.70usft (above Mean Sea Level) Date From - To Hrs Task Cade NPT Total Depth Phase Description or Operations (hr)_ _ _ (usft) 21:00 - 2230 1.50 DRILL P 3,851.00 SURF PLANNED WIPER TRIP: PULL OUT OF THE HOLE WITH 13-1/2" DRILLING ASSEMBLY ON ELEVATORS FROM 3201' MD TO 2000' MD - PULL ON ELEVATORS AT 100 FPM - ENCOUNTER TIGHT HOLE WITH 40-50 KLB OVERPULL AT 2340'MD BACKREAM THE REMAINDER OF THE WAY TO THE PLANNED WIPER TRIP DEPTH AT 2000' MD 500 GPM, 1130 PSI 60 RPM, 8 KFT-LBS TORQUE - ORIENT MOTOR TOOLFACE HIGH -SIDE BEFORE RUNNING BACK IN THE HOLE 22:30 - 00:00 1.50 DRILL P 3,851.00 SURF PLANNED WIPER TRIP: RUN IN THE HOLE WITH 13-1/2" DRILLING ASSEMBLY ON ELEVATORS FROM 2000' MD. RUN IN THE HOLEAT 100 FPM - ENCOUNTER TIGHT HOLE, SET DOWN 45 KLBS AT 2288' MO WORK TIGHT HOLE 2228' MD TO 2410' MD PICK UP SEVERAL TIMES WORKING UP TO 110 KLBS OVERPULLAND SET DOWN WITH 'ALLAVAILABLE WEIGHT ABLE TO PICK UP FREE AFTER SEVERAL ITERATIONS: PU = 130 KLBS - SET DOWN ALLAVAILABLE WEIGHTAND ATTEMPT TO WORK DOWN THROUGH MULTIPLE TIMES DISCUSS WITH ODE AND SR. WSL - ROTATE AT 20 RPM WITH 100 GPM AND WORK PIPE WITH ALLAVAILABLE WEIGHT DOWN 702410 MD - DRAG FELL OFF AFTER 2410' MD - RE -TAKE SURVEY AT 2451' MD AND VERIFIED HOLE NOT SIDETRACKED - CONTINUE IN THE HOLE TO 2530' MD WITHOUT ANY EXCESSIVE DRAG OR OVERPULLS Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths' Common Well Name: 01-36 Event Type. DRL- ONSHORE (DON) North America - ALASKA - BP Page 8 of 31 Operation Summary Report Start Date: 6/13/2018 End Date: 7/1/2018 AFE No X3-018YT-C'. (7.883,309.00 ) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00 OOPM Rig Release: 7/6/2018 Rig Contractor. PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) 6/18/2018 00:00 - 06:30 6.50 DRILL P 3,851.00 SURF BACKREAM AND WIPE HOLE FROM 2530' MD TO 2144'MD BEFORE CONTINUING WIPER TRIP TO TO STAGE UP PUMPS TO FULL DRILLING RATE TO BACKREAM SLOWLY THROUGH TIGHT SECTION - INDICATIONS OF PLUGGED JETS ON BIT: INITIAL PRESSURES MORE THAN DOUBLE THAT OBSERVED WHEN TAKING SURVEY 15 MIN PRIOR - WORK RATE UP TO 550 GPM, 2900 PSI - 60 RPM, 5-8 KFT-LBS TORQUE - MUD WEIGHT IN/OUT = 9.1/9.1 PPG - INCREASE PULLING SPEED AS TORQUE SMOOTHED OUT - FROM 2530' MD TO 2440' MD, PULLAT 60 FPH; HOLE UNLOADED A SIGNIGNIFICANT AMOUNT OF PEA GRAVELAND CLAY IN WAVES - FROM 244V MD TO 2353' MD, PULLAT 120 FPH - FROM 2353'MD TO 2144'MD. PULLAT 300 FPH RUN IN THE HOLE ON ELEVATORS FROM 2144'MD TO 2507' MD -ORIENT TOOLFACE HIGH -SIDE PRIOR TO RUNNING IN - PU 132 KLBS, SO 102 KLBS AT 2144'MD -ENCOUNTER OBSTRUCTION AT 2507'MD AND BEGIN WORKING DOWN 06:30 - 0830 2.00 DRILL P 3,851.00 WORK TIGHT HOLE FROM 2507' MD TO' MD TO 2630' MD - PICK UP SEVERAL TIMES WORKING UP TO 120 KLBS OVERPULLAND SET DOWN WITH ALLAVAILABLE WEIGHT - OBSTRUCTION MOVED UP THE HOLE 25' WHILE WORKING FREE UP. - SET DOWN ALLAVAILABLE WEIGHT AND ATTEMPT TO WORK DOWN THROUGH MULTIPLE TIMES - ROTATE AT 20 RPM WITH 100 GPM AND WORK PIPE WITH ALLAVAILABLE WEIGHT DOWN TO 2560 MD - DRAG FELL OFF AFTER 2560' MD - CONTINUE IN THE HOLE TO 2625' MD WITH PUMPS AND ROTATION RUN IN THE HOLE ON ELEVATORS FROM 2630' MD TO HOLE SECTION TO AT 3851' MD - RE -ORIENT TOOLFACE HIGH -SIDE - WASH DOWN FINAL STAND AT 2 BPM, NO FILL OBSERVED ON BOTTOM - FINAL SLACKOFF WEIGHT = 100 KLBS SURF CIRCULATE THE HOLE CLEAN AT TD WITH 2 TOTAL BOTTOMS UP WHILE RACKING BACK STANDS EVERY 1/2 HOUR TO 3670' MD. - 650 GPM, 2885 PSI, 60 RPM, 7-8 KFT-LBS, 2 FPM PULLING SPEED -FLOWCHECK WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM (STATIC) Pnnted 7131/2018 9:01:12AM `All depths reported in Drillers Depths* Common Well Name: 01-38 Event Type: DRL- ONSHORE(DON) Project: PBU North America - ALASKA - SP Page 9 of 31 Operation Summary Report Start Date: 6/13/2018 End Date: 7/1/2018 Site: 01 AFE No K3-018YT-C:(7,883,309. 00) Rig Name/No.: PARKER 272 Spud Date/time: 6/15/2018 12:00:OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ _ _ (hr) _ _ (usft) 08:30 - 11:30 3.00 DRILL P 3,851.00 SURF FINAL TRIP: PULL OUT OF THE HOLE WITH Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths' 13-1/2" DRILLING ASSEMBLY ON ELEVATORS FROM 3670' MD TO BHA AT 928' MD - INITIAL PICKUP WEIGHT OFF BOTTOM =170 KLBS - NO ISSUES THROUGH OPEN HOLE - WIPE 5 STANDS FROM 1950'- 2450' MD TO CONFIRM NO ISSUES AFTER TROUBLE DURING WIPER TRIP - PULLING SPEED = 50-100 FPM 11:30 - 14:00 2.50 DRILL P 3,851.00 SURF FINAL TRIP: RACK BACK HWDP AND LAYDOWN 13-1/2" DRILLING ASSEMBLY FROM 928' MD TO SURFACE - GRADE BIT 3 (INNER) AND 6 (OUTER), 5/16" UNDERGAUGE 1400 - 1600 2.00 CASING P 3,851.00 SURF RIG UP TO RUN SURFACE CASING - DOYON CASING VOLANT TOOL, SIDE DOOR ELEVATORS, 350T SPIDER AIR SLIPS, - CONFIRM PIPE COUNT IN SHED +TALLY WITH ODE+ HANDLING EQUIPMENT 16:00 - 00:00 8.00 CASING P 3.851.00 SURF RUN 10-3/4" SURFACE CASING FROM SURFACE TO 2410' MD AT MIDNIGHT - FLOWCHECK WELL FOR 10 MIN PRIOR TO RUNNING IN HOLE (STATIC) -SAKERLOK AND CHECK SHOE TRACK FLOATS (PASS) - APPLY BEST -O -LIFE AND MAKEUP BTC CONNECTIONS TO -BKFT-LBS OPT TRQ TO MARK WITH VOLANT TOOL - FILL PIPE ON FLY WITH VOLANT, CIRCULATE EVERY 10TH JOINT DOWN WITH 50 BBLS NEW MUD ON BACKSIDE AT 10 BPM - RUN 1 FREE FLOATING CENTRALIZER PER JOINT - RUN IN THE HOLE AT 100 FPH -FILLCASING ON THE FLY, CIRCULATE EVERY 10TH JOINT DOWN WITH 50 BBLS AT 10 BPM - MUD WEIGHT IN/OUT = 9.1 PPG - MUD LOSSES WHILE RUNNING IN THE HOLE = 42 BBLS ENCOUNTER TIGHT HOLE AT 2388' MD - WORK CASING DOWN FROM 2388' MD TO 2410' MD WITH UP TO 75 KLBS OVERPULL AND ALLAVAILABLE WEIGHT DOWN. - PU / SO WEIGHTS WITH PIPE FULL AT 2410' MD = 140 KLBS / 99 KLBS Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths' Common Well Name: 01-36 Event Type: DRL- ONSHORE(DON) North America -ALASKA - BP Page 10 of 31 Operation Summary Report Start Date: 6/13/2018 AFE No End Date: 7/1/2018 X3-018YT-C:(7,883,309. 00) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00 00PM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI' USA000G6193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Dale From - To His Task Code NPT _ (hr) 6/19/2018 00:00 - 10:00 10.00 CASING P 10:00 - 14:00 4.00 CASING P Total Depth Phase Description of Operations (usft) 3,851.00 SURF RUN 10-31,V' 45.5#, L-80, BTC SURFACE CASING TO PLANNED SET DEPTH AT 3840' MD, 3464' TVD - WORK PIPE DOWN THROUGH TIGHT HOLE FROM 2410' MD TO SET DEPTH - VARY RUNNING SPEEDS, PUMPS ON/OFF, AND HOOKLOAD AS NEEDED TO WORK PIPE DOWN. REGULARLY SETALLAVAILABLE STRING WEIGHT DOWN. PIPE IS ALWAYS FREE UPAND NEVER SEE ANY SIGNS OF PACKING OFF. SUSPECT GEOMETRY ISSUES BETWEEN 2000'AND 3000' MD -WASH DOWN FINAL JOINTS - FINALPU/SO WEIGHTS WITH PUMPS ONAT 10 BPM = 192/120 KLBS - TOTAL LOSSES FOR ENTIRE 18 HOUR CASING RUN --160 BBLS(PUSHED AWAY FLUID) 3,851.00 SURF CIRCULATE HOLE CLEAN AND CONDITION MUD FOR CEMENTING WITH 6 TOTAL 'BOTTOMS UP ''- 10 BPM, 725 PSI INITIAL, 500 PSI FINAL, RECIPROCATING 20' STROKES -MWIWOUT= 9.1 PPG, NO LOSSES -CONDITION MUD TO -19 YP - SIMOPS: MIRU SLB CEMENTERS AND HOLD PRE -JOB SAFETY MEETING FOR CEMENTING. RIG UP CEMENTING LINE TO TOP DRIVE - PRESSURE TEST (FOLLOWING PRESSURE CROSSCHECK) CEMENTING LINES TO 250 PSI LOW AND 4500 PSI FOR LEAKTIGHT CRITERIA WITH WATER (PASS). BATCH UP FIRSTTUBS OF MUD PUSH. Panted 7/31/2016 9:01:12AM *All depths reported in Drillers Depths` 18:30 - 2030 2.00 CASING P 3,851.00 PERFORM DISPLACEMENT WITH RIG PUMPS AND 9.1 PPG MAXDRIL MUD PER SLB CEMENTICS RATE SCHEDULE '- 100 BBLS DISPLACED AT 10 BPM: ICP 660 PSI, FCP 675 PSI '- 235 BBLS DISPLACED AT 7 BPM: ICP 450 PSI, FCP 975 PSI - 13.3 BBLS DISPLACED AT 2 BPM: ICP 740 PSI, FCP 782 PSI - REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE 782 PSI - BUMP PLUG AND INCREASE PRESSURE TO 1300 PSI. HOLD FOR 5 MIN, BLEED OFF AND CHECK FLOATS -GOOD - TOTAL DISPLACEMENT VOLUME 358 BBLS (MEASURED BY STROKES @ 96% PUMP EFFICIENCY) - RECIPROCATE PIPE 20-30 FTAT SURFACE DURING ENTIRE JOB EXCEPT WHEN NEW FLUID ROUND CORNER. UNABLE TO MOVE PIPE AFTER DROPPING THE TOP PLUG, PIPE STUCK OFF LANDING RING -10" WITH 0 K BS STRING WEIGHT - CEMENT IN PLACE AT 18: 33 - TOTAL CEMENT RETURNS TO SURFACE =76 _ BBLS -- TOL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE: 108 BBLS SURF RIG DOWN CASING EQUIPMENT - DISENGAGE VOLANT TOOLAND LAYDOWN LANDING JOINT -FLUSH DIVERTER ELEMENTAND LOW PRESSURE RISERS - NOTIFY ODE, WSUP, AN ETL OF STUCK PIPE, DECISION MADE TO NIPPLE DOWN OIVERTER AND RISERS, SET EMERGENCY SLIPS, CUT PIPE AND SET CONTINGENCY Printed 7/31/2018 9:01:12AM *AI depths reported in Drillers Depths' North America - ALASKA - BP Page 11 of 31 Operation Summary Report Common Well Name: 01-36 AFE No Event Type: DRL-ONSHORE (DON) Stan Date: 6/13/2018 End Late. 7/1/2018 X3-018YT-C: (7,883,309 00 ) Project: PBU Site: Of Rig Name/No.: PARKER 272 Spud DateTme: 6/15/2018 12:00:00PM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum'. 01-36 ACTUAL Def @8870usft (above Mean Sea Level) Date From - To Hrs Task Code NET Total Depth Phase Description of Operations (hr) (usfq 1400 - 1830 4.50 CASING P 3,851.00 SURF CEMENT 10-3/4" SURFACE CASING AS FOLLOWS: - SLB PUMP 100 BBLS OF 10 PPG MUDPUSH II SPACER @ 5 BPM, 200 PSI - DISENGAGE VOLANT TOOLAND LAUNCH BOTTOM PLUG - PUMP 782 BBLS OF 11.0 PPG LITECRETE LEAD CEMENT @ 5 BPM, EXCESS VOLUME YY 350% IN PERMAFROST, 40% BELOW PERMAFROST (YIELD 1.91 CU.FT/SK), OBSERVE BOTTOM PLUG LAND AND BURST AT 363 BBL INTO LEAD CEMENT, 944 PSI y -PUMP 538BLS OF 75.8 PPGCLASSGTAIL@ 5 BPM, EXCESS VOLUME 40% (YIELD 1.16 CU.FT/SK) - DISENGAGE VOLANT TOOLAND LAUNCH TOP PLUG - SLB PUMP 10 BBL FRESH WATER 18:30 - 2030 2.00 CASING P 3,851.00 PERFORM DISPLACEMENT WITH RIG PUMPS AND 9.1 PPG MAXDRIL MUD PER SLB CEMENTICS RATE SCHEDULE '- 100 BBLS DISPLACED AT 10 BPM: ICP 660 PSI, FCP 675 PSI '- 235 BBLS DISPLACED AT 7 BPM: ICP 450 PSI, FCP 975 PSI - 13.3 BBLS DISPLACED AT 2 BPM: ICP 740 PSI, FCP 782 PSI - REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP: FINAL CIRCULATING PRESSURE 782 PSI - BUMP PLUG AND INCREASE PRESSURE TO 1300 PSI. HOLD FOR 5 MIN, BLEED OFF AND CHECK FLOATS -GOOD - TOTAL DISPLACEMENT VOLUME 358 BBLS (MEASURED BY STROKES @ 96% PUMP EFFICIENCY) - RECIPROCATE PIPE 20-30 FTAT SURFACE DURING ENTIRE JOB EXCEPT WHEN NEW FLUID ROUND CORNER. UNABLE TO MOVE PIPE AFTER DROPPING THE TOP PLUG, PIPE STUCK OFF LANDING RING -10" WITH 0 K BS STRING WEIGHT - CEMENT IN PLACE AT 18: 33 - TOTAL CEMENT RETURNS TO SURFACE =76 _ BBLS -- TOL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE: 108 BBLS SURF RIG DOWN CASING EQUIPMENT - DISENGAGE VOLANT TOOLAND LAYDOWN LANDING JOINT -FLUSH DIVERTER ELEMENTAND LOW PRESSURE RISERS - NOTIFY ODE, WSUP, AN ETL OF STUCK PIPE, DECISION MADE TO NIPPLE DOWN OIVERTER AND RISERS, SET EMERGENCY SLIPS, CUT PIPE AND SET CONTINGENCY Printed 7/31/2018 9:01:12AM *AI depths reported in Drillers Depths' North America -ALASKA - BP Operation Summary Report Page 12 of 31 Common Well Name: 01-36 AFE No Event Type: DRL-ONSHORE (DON) Stan Date 6/13/2018 End Date'. 7/1/2018 X3-01 BYT-C: (7,883 309 00 ) Project PBU Site 01 Rig Name/No.: PARKER 272 Spud Oatelrime: 6/15/2018 12:00 OOPM Rig Release: 7/6/2018 Rig Contractor. PARKER DRILLING CO. BPUOI: USA00006193 Active datum. 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ 20:30 - 00:00 3.50 CASING P 3,851.00 SURF _ NIPPLE DOWN DIVERTER ANNULAR AND RISER - LAY DOWN DIVERTER LINES - PULL FLOW RISER - REMOVE FLOW LINE AND TURNBUCKLES - UNBOLTAND LAY DOWN DIVERTER ANNULAR - UNBOLT RISERS AND LAY DOWN 6/20/2018 00:00 - 02:00 2.00 CASING N 3,851.00 SURF SET FMC EMERGENCY CASING SLIPS -MAKE UP LANDING JOINT TO MANDREL CASING HANGER AND ENGAGE VOLANT TOOL - PULL UP TO 500 KLBS STRING WEIGHT - SET SLIPS PER FMC - DISENGAGE VOLANT TOOL ANDRIG DOWN. LAYDOWN LANDING JOINT 02:00 - 05:00 3.00 CASING N 3,851.00 SURF RIG UP WACHS CUTTER AND CUT CASING - DRESS OFF AND BEVEL CASING STUB 05:00 - 08:30 3.50 WHSUR N 3,851.00 SURF INSTALL NEW 11", 5K, SLIP LOCK WELLHEAD PER FM "Ei.SCbiM INCORRECT SEAL ELEMENT IN SLIP LOCK HEAD �- WAIT ON NEW SLIP LOCK WELLHEAD . SIMOPS: - CHANGE OUT UPPER IBOP ON TOP DRIVE - PRESSURE TEST CHOKE MANIFOLD OFFLINE 08:30 - 14.00 5.50 BOPSUR P 3,851.00 SURF INSTALL NEW 11", 5K, SLIP LOCK WELLHEAD PER FMC - ORIENT VALVES AND INSTALL ON CASING STUB -TORQUE SLIP LOCK TO ENGAGE SLIPSAND SEALS - VISUAL LEAKTIGHT PRESSURE TEST VOID BETWEEN SEALS TO 500 PSI _- INSTALL TUBING HEAD AND TORQUE BOLTS 14:00 - 19:00 5.00 BOPSUR P 3,851.00 SURF NIPPLE UP 13-5/8" BOP STACK - INSTALL 11"X 13-5/8" DSA - NIPPLE UP 13-5/8' HIGH PRESSURE RISERS - NIPPLE UP 13-5/8" BOP STACK -STACK CONFIG: ANNULAR, 7'X4-1/2" VBR, BLIND/SHEAR, MUD CROSS, 2-7/8'X5' VBR - TORQUE ALL BOLTS TO SPEC - INSTALL TURNBUCKLES, FLOW LINE, AND FLOW RISERS 1900 - 21:00 2.00 BOPSUR P 3,851.00 SURF RIG UP TO TEST ROPE - INSTALL TEST PLUG - MAKE UP TEST JOINT - BLEED AIR FROM SYSTEM -PERFORM BODY TEST - SPOT CHECK TORQUE ON BOLTS Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths' North America -ALASKA - BP Page 13 of 31 Operation Summary Report Common Well Name:01-38 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 6/13/2018 End Date. 7/1/2018 X3-018YT-C: (7,883 309.00 ) Project: PBU Site. 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00 OOPM Rig Release: 7/612018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70us8 (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations . (hr) - 0330 _. (usft) P 3,851.00 21:00 - 00:00 3.00 BOPSUR P 3,851.00 SURF PRESSURE TEST BOPE TO 250 PSI LOW AND _-_CLEANAND CLEAR THE RIG FLOOR 03:30 - 07:00 3.50 3500 PSI HIGH FOR 5 MIN EACH P 3,851.00 SURF MAKE UP 9-7/8" INTERMEDIATE BHATO - REVIEW PRESSURE CROSSCHECK TOTAL LENGTH OF 892'MD - TEST WITH 4",5", AND 7" TEST JOINTS - 9-7/8" SMITH X616 BIT, AUTOTRAK, ONTRAK - TEST RAM LOCKS, TEST REMOTE PANEL BLACK OUT, TEST HIGH LOW BYPASS - TEST FIRE AND GAS ALARMS - SHALLOW HOLE TEST MWD AT 190' MD '- NO FAILURES, SEE ATTACHED TEST WITH 700 GPM, 1330 PSI (GOOD TEST) 07:00 - 08:00 1.00 DRILL CHARTS 3,851.00 SURF SLIP AND CUT 9 WRAPS, 76' OF 1-3/8" DRILL - WITNESS WAIVED BYAOGCC REP LOU LINE 'LAUBENSTEIN _ 6/21/2018 00:00 - 0030 0.50 BOPSUR P 3,851.00 SURF 'COMPLETE BOPE TEST SEE DETAILS IN _ BLOCKS AFTER CUT _ -PREVIOUS TIME ENTRY 00:30 - 01:30 1.00 BOPSUR P 3,851.00 SURF RIG DOWN AFTER ROPE TESTING 01:30 - 02:30 1.00 CASING P 3,851.00 SURF PRESSURE TEST 10-3/4" SURFACE CASING ASSEMBLY FROM BHAAT 892' MD TO THE AGAINST BLIND RAMS WITH 9.1 PPG TOP OF THE PLUGS AT 3751' MD 1yj LMUD 703500 PSI FOR 30 MIN - WASH DOWN THE LAST 200' AT 600 GPM, (PASS) lOy' 1000 REVIEW PRESSURE CROSSCHECK 2.00 DRILL P 3,851.00 SURF DRILL CEMENTAND FLOAT EQUIPMENT -MONITOR VOID BETWEEN SLIP -LOCK CASING HEAD SEALS (NO PRESSURE INCREASE) - 450 GPM, 1050 PSI, 60-80 RPM, 8 KFT-LBS _ '.- PRESSURE TEST OUTER SPOOL WORKING TORQUE , 2 -10 KLB_S W_ OB_ 12:00 - 1300 1.00 DRILL VALVES AND SPOOL FLANGESAS PART OF 3,851.00 SURF DISPLACE WELL FROM 9.1 PPG MAXDRIL TO TEST 9.9 PPG LSND - PUMPED 5.5 BBL, BLED BACK 5.5 BBL - 700 GPM, 1670 ICP - 1790 FCP -TESTAPPROVED BY WSUP, SEE ATTACHED Printed 7/31/2018 9:01:12AM 'All depths reported in Drillers Depths' _ ____ DOCUMENTATION 02:30 - 0330 1.00 BOPSUR P 3,851.00 SURF INSTALL WEAR BUSHING (10" ID) _-_CLEANAND CLEAR THE RIG FLOOR 03:30 - 07:00 3.50 DRILL P 3,851.00 SURF MAKE UP 9-7/8" INTERMEDIATE BHATO TOTAL LENGTH OF 892'MD - 9-7/8" SMITH X616 BIT, AUTOTRAK, ONTRAK (GAM/RES/PR ESNSS/SU RVEY) - SHALLOW HOLE TEST MWD AT 190' MD WITH 700 GPM, 1330 PSI (GOOD TEST) 07:00 - 08:00 1.00 DRILL P 3,851.00 SURF SLIP AND CUT 9 WRAPS, 76' OF 1-3/8" DRILL LINE - CUT AT 1900 TON -MILES, RE -CALIBRATE . _ BLOCKS AFTER CUT _ 08:00 - 10:00 2.00 DRILL P 3,851.00 SURF TRIP IN HOLE WITH 9-7/8" DRILLING ASSEMBLY FROM BHAAT 892' MD TO THE TOP OF THE PLUGS AT 3751' MD - WASH DOWN THE LAST 200' AT 600 GPM, _1650 PSI 1000 - 1200 2.00 DRILL P 3,851.00 SURF DRILL CEMENTAND FLOAT EQUIPMENT FROM 3751' MD TO 3830' MD (10' FROM SHOE) - 450 GPM, 1050 PSI, 60-80 RPM, 8 KFT-LBS _ TORQUE , 2 -10 KLB_S W_ OB_ 12:00 - 1300 1.00 DRILL P 3,851.00 SURF DISPLACE WELL FROM 9.1 PPG MAXDRIL TO 9.9 PPG LSND - 700 GPM, 1670 ICP - 1790 FCP - TAKE _SPR'S_ 13:00 - 14:00 1.00 DRILL P 3,871.00 SURF DRILL OUT CEMENT, 10-3/4" CASING SHOE AND 20' OF NEW FORMATION FROM 3830' MD TO 3871' MD - 700 GPM, 1900 PSI, 90 RPM, 6 KFT-LBS TORQUE, 10 KLBS WOB Printed 7/31/2018 9:01:12AM 'All depths reported in Drillers Depths' North America - ALASKA -BP Operation Summary Report Common Well Name. 01-36 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 6/13/2018 End Date: 7/1/2018 X3-016YT-C: (7,883,309.00 ) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00:00PM Rig Release: 7/6/2018 Page 14 of 31 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr). _ - (usft) 14:00 - 16:00 2.00 DRILL P 3,871.00 SURF CIRCULATE BOTTOMS UP TO ENSURE CLEAN FLUID COLUMN AND EVEN MW IN/OUT - 750 GPM, 2100 PSI - MUD WT IN/OUT = 9.9 PPG 16:00 - 17:00 1.00 DRILL P 3,871.00 SURF PERFORM LOT TO 14.6 PPG EMW -9.9 PP IED K AT SURFACE - PUMP 3 BBLS, BLEED BACK 3 BBLS Lp - LOT APPROVED BY ODE, 12.4 PPG EMW REQUIRED PER WELL PROGRAM, SEE _ ATTACHED CHART 17:00 - 23:00 6.00 DRILL P 4,776.00 INTI DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE . HOLE FROM 3871' MD TO 4776' MD (925' IN 6 HRS = 154 FT/HR WITH CONNECTIONS) THROUGH THE SV 4, 3, 2, & 1 FORMATIONS - INSTANTANEOUS ROP = 250 FT/HR - 750 GPM, 2350 PSI ON/OFF BOTTOM, 160 RPM, 1017 KFT-LBS TORQUE ON/OFF BOTTOM TRO, 5-15 KLBS WOB - PU = 175 KLBS, SO = 127 KLBS, ROT = 147 KLBS - SURVEY EVERY -90 FT, NO BACKREAMING - ECD ACTUAL= 10.6 PPG EMW, HARDLINE = 11.9 PPG EMW, CALC CLEANHOLE = 10.4 PPG -MUD WEIGHT IN/OUT=9.9 PPG - GAS WATCH AVERAGE = 25 UNITS, GAS WATCH MAX = 150 UNITS -MINOR SEEPAGE LOSSES WHILE DRILLING, 43 BBL TOTAL - PUMP 35 BBL HI -VIS SWEEP AT 4310' MD WITH 25% INCREASE IN CUTTINGS 23:00 - 00:00 1.00 DRILL N 4,776.00 INTI CHANGE OUT SEAT AND VALVE IN MUD PUMP #1 - CIRCULATE ON ONE PUMP 585 GPM, 340 PSI, 60 RPM, 6 KFT-LBS 6/22/2018 00:00 - 06:00 6.00 DRILL P 5,559.00 INTI DIRECTIONALLY DRILL 9-718" INTERMEDIATE HOLE FROM 4776' MD TO 5559' MD (783' IN 6 HRS = 131 FT/HR WITH CONNECTIONS) THROUGH THE SV 1 AND UGNU FORMATIONS - 750 GPM, 2325-2450 PSI ON BOTTOM, 160 RPM, 9-12.5/8-10 KFT-LBS ON/OFF BTM TRQ, 5-15 KLBS WOB - INSTANTANEOUS ROP = 250 FT/HR - PU = 175 KLBS, SO =127 KLBS, ROT = 147 KLBS AT 5530' MD - SURVEY EVERY STAND, NO BACKREAMING - ECDACTUAL= 10.7 PPG EMW, HARDLINE _ 11.9 PPG EMW, CLEANHOLE =10.5 PPG - MUD WEIGHT IN/OUT = 9.9 PPG - GAS WATCH AVERAGE = 50 UNITS, GAS WATCH MAX = 300 UNITS - PUMP 35 BBL HI -VIS SWEEPAT 4890' MD WITH 50% INCREASE IN CUTTINGS - PUMP 35 BBL HI -VIS SWEEPAT 5400' MD WITH 75% INCREASE IN CUTTINGS Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 15 of 31 Common Well Name. 01-36 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 6/13/2018 End Date. 7/1/2018 X3-018YT-C. (7,883,305.00 ) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Daterrime: 6/15/2018 12:00 OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL DeI (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) .. (us8) . 06:00 - 12:00 6.00 DRILL P 6,408.00 INT1 DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 5559' MD TO 6408' MD (849' IN 6 HRS = 142 FT/HR WITH CONNECTIONS) THROUGH THE UGNU FORMATION - 750 GPM, 2450-2600 PSI ON BOTTOM, 160 RPM, 10.5-14/10-12 KFT-LBS ON/OFF BTM TRO, 5-15 KLBS WOB '- INSTANTANEOUS ROP = 250-300 FT/HR - PU = 232 KLBS, SO = 141 KLBS, ROT = 173 KLBS AT 6391' MD - SURVEY EVERY STAND, NO BACKREAMING -ECD ACTUAL =10.7-10.8 PPG EMW, HARDLINE = 11.9 PPG EMW, CLEANHOLE _ 10.5-10.6 PPG -MUD WEIGHT IN/OUT=9.9 PPG - GAS WATCH AVERAGE =50 UNITS, GAS WATCH MAX = 250 UNITS - PUMP 35 BBL HI -VIS SWEEP AT 5900' MD WITH 100% INCREASE IN CUTTINGS '- PUMP 35 BBL WEIGHTED SWEEP AT 6400' MD WITH 75% INCREASE IN CUTTINGS 12.00 - 18.00 600 DRILL P 7,342.00 INTI DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 6408' MD TO 7342' MD (834' IN 6 HRS = 156 FT/HR WITH CONNECTIONS) THROUGH THE UGNU AND WS FORMATIONS - 750 GPM, 2550-2700 PSI ON BOTTOM, 160 RPM, 18/14 KFT-LBS ON/OFF BTM TRO, 18 KLBS WOB - INSTANTANEOUS ROP = 250-300 FT/HR - PU = 269 KLBS, SO = 153 KLBS, ROT = 189 KLBS - SURVEY EVERY STAND, NO BACKREAMING -ECD ACTUAL=10.8 PPG EMW, HARDLINE= 11.9 PPG EMW, CLEANHOLE= 10.51 PPG - MUD WEIGHT IN/OUT = 9.9 PPG - GAS WATCH AVERAGE = 50 UNITS, GAS WATCH MAX = 162 UNITS - PUMP 35 BBL HI -VIS SWEEP AT 6970' MD WITH 100% INCREASE IN CUTTINGS Printed 7/31/2018 9:01'.12AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 16 of 31 Operation Summary Report Common Well Name. 01-36 AFE No Event Type: DRL- ONSHORE (DON) Start Date'. 6/13/2018 End Date: 7/1/2018 X3-018YT-C: (7,883,309.00) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00:OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Der @88.70usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 DRILL P 8,076.00 INT1 DIRECTIONALLY DRILL 9-718" INTERMEDIATE HOLE FROM 7342' MD TO 8076' MD (734' IN 6 HRS = 122 FT/HR WITH CONNECTIONS) THROUGH THE WSAND CM FORMATIONS - 750 GPM, 2700-2950 PSI ON BOTTOM, 160 RPM, 18/14 KFT-LBS ON/OFF BTM TRO, 18 KLBS WOB '- INSTANTANEOUS ROP =150-200 FT/HR, BEGIN HOLDING BACK ROP <200 FPH AT THE TOP OF THE CM3 AT 7621' MD PER WELL PROGRAM - PU = 280 KLBS, SO = 160 KLBS, ROT = 200 KLBS - SURVEY EVERY STAND, NO BACKREAMING -ECD ACTUAL=10.8 PPG EMW, HARDLINE= 11.9 PPG EMW, CLEANHOLE = 10.51 PPG -MUD WEIGHT IN/OUT=10.1 PPG '- GAS WATCHAVERAGE = 50 UNITS, GAS WATCH MAX = 162 UNITS - 108 BBL SEEPAGE LOSSES WHILE DRILLING THE LAST 24 HRS PUMP 35 BBL HI -VIS SWEEP AT 7350'MD WITH 75% INCREASE IN CUTTINGS - PUMP 35 BBL HI -VIS SWEEP AT 7905' MD WITH 75% INCREASE IN CUTTINGS - BLEND IN 290 BBL OF 11 PPG SPIKE FLUID TO WEIGHT UP TO 10.1 PPG PRIOR TO REACHING THE CM2 6/23/2018 0000 - 0600 6.00 DRILL P 8,726.00 INTI DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 8076' MD TO 8726' MD (650' IN 6 HRS = 108 FT/HR WITH CONNECTIONS) THROUGH THE WS AND CM FORMATIONS - 750 GPM, 3050 PSI ON BOTTOM, 160 RPM, 19/15 KFT-LBS ON/OFF BTM TRO, 18 KLBS WOB - INSTANTANEOUS ROP = 150-200 FT/HR, BEGIN HOLDING BACK ROP <200 FPH AT THE TOP OF THE CM3 AT 7621' MD PER WELL PROGRAM - PU = 260 KLBS, SO = 160 KLBS, ROT = 200 KLBS AT 8726' MD - SURVEY EVERY STAND, NO BACKREAMING - ECD ACTUAL = 11 PPG EMW, HARDLINE _ 11.9 PPG EMW, CLEANHOLE = 10.8 PPG - MUD WEIGHT IN/OUT = 10.1 PPG, LOSSES = NEGLIGIBLE - GAS WATCH AVERAGE = 60 UNITS, GAS WATCH MAX= 116 UNITS Printed 7/31/2018 9:01:12AM •AII depths reported in Drillers Depths' BEGIN BLEEDING IN 500 BELS OF SPIKE FLUIDAT 9150' MD TO DILUTE MUD SYSTEM, INCREASE MW TO 10.7 PPG AND ADD BLACK PRODUCT (SHALE STABILIZERS) 1200. - 2030'. 8.50 DRILL P 10,057.00 INT1 DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 9276' MD TO 10057' MD (781' IN 8.5 HRS = 92 FT/HR WITH CONNECTIONS) THROUGH THE CM2/CMI,HRZAND KNG FORMATIONS - 750-700 GPM, 3450-3375 PSI ON BOTTOM, 160-120 RPM, 23/16 KFT-LBS ON/OFF BTM TRQ, UP TO 22 KLBS WOB - DROP FLOWRATE TO 700 GPM, 3375 PSI ON BTM AND ROTATION TO 120 RPM, 23/16 KFT-LBS TRQ ON/OFF BTM AT TOP OF SHALES PER WELL PROGRAM - INSTANTANEOUS ROP = 125-175 FT/HR, BEGIN HOLDING BACK ROP <200 FPH AT THE TOP OF THE CM3 AT 7621' MD PER WELL PROGRAM - PU = 315 KLBS, SO = 190 KLBS, ROT = 225 KLBS AT 10057' MD - SURVEY EVERY STAND, NO BACKREAMING - ECD ACTUAL = 11.6 PPG EMW, HARDLINE _ 11.9 PPG EMW, CLEANHOLE = 11.32 PPG - MUD WEIGHT IN/OUT =10.7 PPG, LOSSES = NEGLIGIBLE - GAS WATCH AVERAGE = 100 UNITS, GAS WATCH MAX = 359 - PUMP 30 BBL LO/HI-VIS TANDEM SWEEPS AT 9620' MD (100% INCREASE IN RETURNS) COMPLETE BLEEDING IN 500 BBLS OF SPIKE FLUID AT 9420' MD (271' MD ABOVE HI TO DILUTE MUD SYSTEM, INCREASE MW TO 10.7 PPGANDADD BLACK PRODUCT (SHALE STABILIZERS) Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths' North America -ALASKA - BP Page 17 of 31 Operation Summary Report --- Common Well Name: 07-36 - —- - AFE No Event Type: DRL- ONSHORE (DON) Start Date. 6/13/2018 End Date: 7/1/2018 X3-018YT-C: (7,883,309.00) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00:OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Hire Task Code NPT Total Depth Phase Description of Operations __ _.._ _ (hr)_ _ (usft) 06:00 - 12:00 6.00 DRILL P 9,276.00 INTI __ _ DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 8726' MD TO 9276' MD (550' IN 6 HRS =92 FT/HR WITH CONNECTIONS) THROUGH THE CM2 FORMATION - 750 GPM, 3150-3450 PSI ON BOTTOM, 160 RPM, 18-20/15-17 KFT-LBS ON/OFF BTM TRQ, 18-22 KLBS WOB - INSTANTANEOUS ROP = 125-175 FT/HR, BEGIN HOLDING BACK ROP -200 FPH AT THE TOP OF THE CM3 AT 7621' MD PER WELL PROGRAM - PU = 304 KLBS, SO = 178 KLBS, ROT = 217 KLBS AT 9266' MD - SURVEY EVERY STAND, NO BACKREAMING - ECD ACTUAL = 11.1 PPG EMW, HARDLINE _ 11.9 PPG EMW, CLEANHOLE = 10.8 PPG - MUD WEIGHT IN/OUT = 10.1 PPG, LOSSES = NEGLIGIBLE - GAS WATCH AVERAGE = 50 UNITS, GAS WATCH MAX = 215 - PUMP 30 BBL LO/HI-VIS TANDEM SWEEPS AT 8475'MD AND 8950'MD (100% INCREASE IN RETURNS FOR BOTH) BEGIN BLEEDING IN 500 BELS OF SPIKE FLUIDAT 9150' MD TO DILUTE MUD SYSTEM, INCREASE MW TO 10.7 PPG AND ADD BLACK PRODUCT (SHALE STABILIZERS) 1200. - 2030'. 8.50 DRILL P 10,057.00 INT1 DIRECTIONALLY DRILL 9-7/8" INTERMEDIATE HOLE FROM 9276' MD TO 10057' MD (781' IN 8.5 HRS = 92 FT/HR WITH CONNECTIONS) THROUGH THE CM2/CMI,HRZAND KNG FORMATIONS - 750-700 GPM, 3450-3375 PSI ON BOTTOM, 160-120 RPM, 23/16 KFT-LBS ON/OFF BTM TRQ, UP TO 22 KLBS WOB - DROP FLOWRATE TO 700 GPM, 3375 PSI ON BTM AND ROTATION TO 120 RPM, 23/16 KFT-LBS TRQ ON/OFF BTM AT TOP OF SHALES PER WELL PROGRAM - INSTANTANEOUS ROP = 125-175 FT/HR, BEGIN HOLDING BACK ROP <200 FPH AT THE TOP OF THE CM3 AT 7621' MD PER WELL PROGRAM - PU = 315 KLBS, SO = 190 KLBS, ROT = 225 KLBS AT 10057' MD - SURVEY EVERY STAND, NO BACKREAMING - ECD ACTUAL = 11.6 PPG EMW, HARDLINE _ 11.9 PPG EMW, CLEANHOLE = 11.32 PPG - MUD WEIGHT IN/OUT =10.7 PPG, LOSSES = NEGLIGIBLE - GAS WATCH AVERAGE = 100 UNITS, GAS WATCH MAX = 359 - PUMP 30 BBL LO/HI-VIS TANDEM SWEEPS AT 9620' MD (100% INCREASE IN RETURNS) COMPLETE BLEEDING IN 500 BBLS OF SPIKE FLUID AT 9420' MD (271' MD ABOVE HI TO DILUTE MUD SYSTEM, INCREASE MW TO 10.7 PPGANDADD BLACK PRODUCT (SHALE STABILIZERS) Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths' North America -ALASKA - BP Operation Summary Report Page 18 of 31 Common Well Name: 01-36 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 6/13/2018 End Date: 7/V2018 X3-018YT-C: (7,883,309.00 ) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00:OOPM Rig Release: 7/6/2018 Rig Contnectoc PARKER DRILLING CO. BPUOI. USA00006193 Active datum: 01-36 ACTUAL Det @88.70usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usR) 20:30 - woo 3.50 DRILL P 10,085.00 INTI PERFORM CASING PICK SCRATCH AND SNIFF FROM 10057' MD TO TD AT 10065' MO - CIRCULATE BOTTOMS UP FOR SAMPLES AT 10057' MD, NO SAG RIVER FORMATION FOUND - DRILL 5' MD TO 10062' MD - CIRCULATE BOTTOMS UP, OBSERVE SAG RIVER FORMATION IN SAMPLES, ONSITE GEO PICK SAG RIVER TOP AT 10060' MD - DRILL ADDITIONAL 3' TO 10065' MD FOR -5' 'MD OF RATHOLE INTO THE SAG RIVER I - CIRCULATE A TOTAL OF 5 BOTTOMS UP WHILE SCRATCHING AND SNIFFING. ECD IMPROVES FROM 11.6 PPG TO 11.35 PPG DURING CIRCULATING. 6/24/2018 00:00 - 09:00 9.00 DRILL P 10,065.00 INTI FINALTRIP: TRIP OUT OFTHE HOLE ON ELEVATORS WITH 9-7/8" DRILLING ASSEMBLY FROM 10065' MD TO BHA AT 892' MD - MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM (STATIC) '- INITIAL PICKUP WEIGHT OFF BOTTOM = 310 KLBS - PULL TIGHT AT 7000' MD AND UNABLE TO PULL THROUGH WITH 40 KLBS OVER. BACKREAM FROM 7000' MD TO 6609' MD (GHOST REAMER TD) AT WHICH POINT THE STRING BEGINS TO PULL FREE; 650 GPM, 2500 PSI, 120 RPM, 5-20 KLBS TRQ. ERRATIC TORQUE, NO PRESSURE SPIKES. ZONE WIPES FREE AFTER BACKREAMING THROUGH. - PULLING SPEEDS ON ELEVATORS RANGE FROM 50 FPM OFF BOTTOM TO 265 FPM IN SURFACE CASING _ 09:00 - 11:30 2.50 DRILL P 10,065.00 INTI LAYDOWN 9-7/8" DRILLING ASSEMBLY FROM BHA AT 892' MD TO SURFACE - FLOWCHECK WELL FOR 10 MIN PRIOR TO PULLING BHA INTO STACK (STATIC) - GHOST REAM -1/32" UNDER GAUGE AND HAS MINOR LEADING EDGE WEAR ON THE BLADES - GRADE SMITH X616 AXEBLADE BIT 2 (INNER), 5 (OUTER), IN GAUGE, SEE ATTACHED PHOTOS 11:30 - 1200 0.50 DRILL P 10,065.00 INTI CLEAR AND CLEAN RIG FLOOR AFTER TRIPPING _ - PULL WEAR RING 12:00 - 14'.00 2.00 CASING P 10,065.00 INTI RIG UP TO RUN 7" CASING - DOYON CASING DOUBLE STACK TONGS AND VOLANT CASING RUNNING TOOL WITH TORQUE TURN EQUIPMENT, e' BAIL EXTENSIONS, SIDE DOOR ELEVATORS, BACK SAVER SLIPS, FILL -UP HOSE -CONFIRM PIPE LAYOUT IN SHED AND HANDLING EQUIPMENT ON RIG FLOOR - HOLD PJSM FOR RUNNING CASING -SERVICEAND LUBRICATE RIG DURING RIG UP Panted 7/31/2018 9:01:12AM *All depths reported in Drillers Depths` Common Well Name: 01-36 Event Type: DRL- ONSHORE (DON) North America - ALASKA - BP Operation Summary Report AFE No Start Date: 6/13/2018 End Date: 7/1/2018 X3-018YT-C'.(7,883,309. 00) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00:OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active d m: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Hm Task Code NPT Total Depth Phase _ (hr) (usft) 14:00 - 00:00 10.00 CASING P 10,065.00 INTI Description of Operations Page 19 of 31 RUN 7-,26#, L-80, VAMTOP HC INTERMEDIATE CASING FROM SURFACE TO 5053' MD AT MIDNIGHT - FLOWCHECK WELL FOR 10 MIN PRIOR TO RUNNING IN THE HOLE (STATIC) - BAKERLOK SHOE TRACKAND CHECK FLOATS (PASS) - APPLY JET LUBE SEAL GUARD AND TORQUE TURN PREMIUM CONNECTIONS WITH TONGS TO 11950 FT -LBS OPT MU TORQUE. VAM REP ON RIG TO INSPECT ALL THREADS AND WITNESS MAKEUP - RUN CENTRALIZERS TO TOP OF PLANNED CEMENT AT 4820' MD (JOINTS A -D, 1-127), INSTALLED IN PIPE SHED BETWEEN STOP RINGS AT 5' AND 15' FROM PIN - FILL PIPE ON THE FLY WITH FILL -UP HOSE. CIRC EVERY 5TH JOINT DOWN WITH 20 BBLS AT BPM THROUGH SV AND UGNU. - CASED HOLE RUNNING SPEED = 115 FPM, OPENHOLE = 70 FPM -- MW IN/OUT = 10.7 PPG, PUSH AWAY 3 BBLS DURING RUN UP TO MIDNIGHT STAGE UP PUMPS AND CIRCULATE 1XBU (190 BBLS) AT 3840' MD 10-3/4" SURFACE CASING SHOE, 7 BPM, 160 PSI, NO PIPE MOVEMENT 6/25/2018 00:00 - 12:00 12.00 CASING P 10,065.00 INTI RUN 7", 26#, L-80, VAMTOP HC INTERMEDIATE CASING FROM 5053' MD TO 10061' MD - APPLY JET LUBE SEAL GUARD AND TORQUE TURN PREMIUM CONNECTIONS WITH TONGS TO 11950 FT -LBS OPT MU TORQUE. VAM REP ON RIG TO INSPECT ALL THREADS AND WITNESS MAKEUP - RUN CENTRALIZERS TO TOP OF PLANNED CEMENT AT 4820' MD (JOINTS A -D, 1-127), INSTALLED IN PIPE SHED BETWEEN STOP RINGS AT 5' AND 15' FROM PIN - FILL PIPE ON THE FLY WITH FILL -UP HOSE. CIRC EVERY STH JOINT DOWN WITH 40 BBLS AT 7 BPM THROUGH SV AND UGNU. CIRC EVERY 10TH JOINT DOWN THROUGH WESTSAKAND COLVILLE WITH 20 BBLS AT 7 BPM, CIRC 1XBU AT TOP OF HRZ (SHALES). - RUNNING SPEED IN OPENHOLE = 70 FPM - SEEATTACHED EXCEL TALLY SIMOPS: LAY DOWN 5" DP WITH OFFLINE EQUIPMENT 12:00 - 15:00 3.00 CASING P 10,065.00 INTI CIRCULATE HOLE CLEAN AND CONDITION MUD FOR CEMENTING - STAGE UP IN 1 BBL INCREMENTS TO 7 BPM ALLOWING PRESSURE TO STABILIZE BETWEEN STAGES - 7 BPM, 440-390 PSI SIMOPS: - MIRU SLB CEMENTERS - FILL LINES WITH WATER AND PRESSURE TEST TO 4500 PSI FOR 5 MINUTES Printed 7/3112018 9:01:12AM `Ali depths reported in Drillers Depths' North America - ALASKA- BP Operation Summary Report Common Well Name: 01-36 Event Type: DRL- ONSHORE (DON) Start Date: 6/13/2018 End Date: 7/1/2018 Project: PBU Site: 01 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level Date From - To Him Task Code NPT Total Depth Phase (hr) _ (usf) 15:00 - 17:30 2.50 CEMT P 10,065.00 INTI Page 20 of 31 AFE No K3-018VT-C(7883,30900) Rig Release: 7/6/2018 SPUOI: USA00006193 Description of Operations CEMENT 7° INTERMEDIATE CASING AS FOLLOWS: - PUMP 40 BBLS OF 11 PPG MUDPUSH II SPACER @ 5 BPM, 380 PSI -RELEASE BOTTOM PLUG PERFORM DISPLACEMENT WITH RIG PUMPS AND 10.7 PPG LSND MUD PER SLB CEMCADE - 300 BBLS DISPLACED AT 7 BPM: ICP 225 PSI, FCP 690 PSI, OBSERVE BOTTOM PLUG LAND AT 102 BBL INTO DISPLACEMENT (AS 'PLANNED) .- 60 BBLS DISPLACED AT 4 BPM: ICP 390 PSI, FCP 640 PSI - REDUCE RATE TO 2 BPM FOR FINAL 12 BBL PRIOR TO PLUG BUMP: ICP 475 PSI, FCP 575 PSI - CEMENT IN PLACE AT 17:00 - BUMP PLUG AND INCREASE PRESSURE TO 1200 PSI AND HOLD FOR 3 MIN, BLEED OFF 2 BBL AND CHECK FLOATS FOR 10 MIN = GOOD - TOTAL DISPLACEMENT VOLUME 374.6 BBLS (MEASURED BY STROKES @ 95.3% PUMP EFFICIENCY) - DID NOT RECIPROCATE PIPE DURING DISPLACEMENT TO AVOID PULLING SHOE OUT OF SAG RIVER FORMATION - TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT NIFTACE: 3 BBLS _ - TOP OF CEMENT FIELD PICK= 4884' MD 1730 - 19:30 2.00 CASING P 10,065.00 INT1 RIG DOWN CASING RUNNING EQUIPMENT -REMOVE LANDING JOINT SIMOPS: - ESTABLISH INJECTIVITY DOWN OA, STARTED INJECTING INTO FORMATION AT 815 PSI, INJECT 5 BBLTOTAL 19:30 - 21:00 1.50 CASING P 10,065.00 INTI RUN IN 7" PACKOFFAND PRESSURE TESTTO - 3500 PSI FOR 15 MIN - FMC ON LOCATION TO RUN IN/TORQUE LOCK DOWN SCREWS AND TEST PACKOFF -SEE ATTACHED DOCUMENTATION - TEST APPROVED BY WSUP Printed 7/31/2018 9.01:12AM 'All depths reported in Drillers Depths' - PUMP 240 BELS (784 SACKS) OF 11.5 PPG _ LITECRETE LEAD CEMENT (D 6 BPM, EXCESS V VOLUME 7% (YIELD 1.72 CU.FT/SK), EXCESS NLY 7% DUE TO SLB CEMENT SHORTAGE - PUMP 34 BBLS (165 SACKS) OF 15.8 PPG CLASS G TAIL @ 5 BPM, EXCESS VOLUME (YI LD 1.16 DU. FT/SK) �J N A EVOLANTTOOLANDLAUNCH TOP PLUG -SLB KICK OUT TOP PLUG WITH 10 BBLS .FRESH WATER PERFORM DISPLACEMENT WITH RIG PUMPS AND 10.7 PPG LSND MUD PER SLB CEMCADE - 300 BBLS DISPLACED AT 7 BPM: ICP 225 PSI, FCP 690 PSI, OBSERVE BOTTOM PLUG LAND AT 102 BBL INTO DISPLACEMENT (AS 'PLANNED) .- 60 BBLS DISPLACED AT 4 BPM: ICP 390 PSI, FCP 640 PSI - REDUCE RATE TO 2 BPM FOR FINAL 12 BBL PRIOR TO PLUG BUMP: ICP 475 PSI, FCP 575 PSI - CEMENT IN PLACE AT 17:00 - BUMP PLUG AND INCREASE PRESSURE TO 1200 PSI AND HOLD FOR 3 MIN, BLEED OFF 2 BBL AND CHECK FLOATS FOR 10 MIN = GOOD - TOTAL DISPLACEMENT VOLUME 374.6 BBLS (MEASURED BY STROKES @ 95.3% PUMP EFFICIENCY) - DID NOT RECIPROCATE PIPE DURING DISPLACEMENT TO AVOID PULLING SHOE OUT OF SAG RIVER FORMATION - TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT NIFTACE: 3 BBLS _ - TOP OF CEMENT FIELD PICK= 4884' MD 1730 - 19:30 2.00 CASING P 10,065.00 INT1 RIG DOWN CASING RUNNING EQUIPMENT -REMOVE LANDING JOINT SIMOPS: - ESTABLISH INJECTIVITY DOWN OA, STARTED INJECTING INTO FORMATION AT 815 PSI, INJECT 5 BBLTOTAL 19:30 - 21:00 1.50 CASING P 10,065.00 INTI RUN IN 7" PACKOFFAND PRESSURE TESTTO - 3500 PSI FOR 15 MIN - FMC ON LOCATION TO RUN IN/TORQUE LOCK DOWN SCREWS AND TEST PACKOFF -SEE ATTACHED DOCUMENTATION - TEST APPROVED BY WSUP Printed 7/31/2018 9.01:12AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: 01-36 AFE No Event Type. DRL- ONSHORE (DON) Start Date: 8/13/2018 End Date: 7/1/2018 X3-018YT-C. (7,683,309.00 ) Protect: PBU Site: 01 BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usfi (above Mean Sea Level) Page 21 of 31 Date From - To Hire Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 21:00 - 0000 3.00 BOPSUR P 10,065.00 INTI CHANGE OUT SAVER SUB TO HT -38, TORQUE WRENCH DIES, AND PIPE GUIDE ON PIPE HANDLER SIMOPS: - CHANGE OUT UPPER RAMS TO 2-7/8" X 5" VBR'S - CLOSE BLIND RAMS AND MONITOR THE FLUID VOLUME IN WELL BY PUMPING THROUGH THE MUD CROSS ON THE BOP STACK 6/26/2018 00:00 - 01:00 1.00 BOPSUR P 10,065.00 INTI RIG UP TO PRESSURE TEST ROPE - MAKE UP TEST JOINT, SET TEST PLUG, FILL STACK AND BLEED AIR 01:00 - 03:00 2.00 BOPSUR P 10,065.00 INTI PRESSURE TEST BOPE TO 250 PSI LOWAND .3500 PSI HIGH FOR 5 MIN EACH - REVIEW PRESSURE CROSSCHECK - TEST ANNULAR, UPPER RAMS, AND LOWER RAMS WITH 2-7/8" TEST JOINT - TEST UPPER RAMS WITH 4-1/2" TEST JOINT - NO FAILURES SIMOPS: '- FREEZE PROTECT OA @ 02:15 (TAIL CEMENTAT 100 PSI COMPRESSIVE STRENGTH @ 01:30) WITH 107 BBL OF 6.8 _ PPG DIESEL, 2.5 BPM, 800-1100 PSI 0300 - 0400 1.00 BOPSUR P 10,065.00 INTI RIG DOWN TESTING EQUIPMENT - PULLTEST PLUGAND LAY DOWN TEST JOINT SET WEAR BUSHING (7" 10) 04:00 - 05:30 1.50 DRILL P 10,065.00 INTI MAKE UP 6-1/8" PRODUCTION HOLE MOTOR BHA TO A TOTAL LENGTH OF 141'MD - 6-1/8" SMITH XR20 TRICONE MILL TOOTH BIT, BAKER XTREME LS MUD MOTOR WITH 2.1`AKO, NAVIGAMMA(DIRECTIONAL VIB/GR) - PLACE JARS AT 4365' BEHIND BIT PER SLB MODELING - SHALLOW HOLE TEST TOOLS PER MWD (PASS) 05:30 - 12:00 6.50 DRILL P 10,065.00 INTI TRIP IN THE HOLE WITH 6-1/8" MOTOR DRILLING ASSEMBLY FROM BHAAT 141' MD TO 9850' MD (-125' ABOVE TOP OF PLUGS AT 9975' MD) - RUNNING SPEED =175-225 FPM - PIPE SELF FILLING THROUGH PORTED FLOAT - BUCKLER CREW COMPLETE KICK WHILE TRIPPING DRILL - FMC REP PRESSURE TEST PACK -OFF OFFLINE DURING TRIP IN HOLE (PASS, SEE ATTACHED CHART, APPROVED BY WSUP) 1200. - 14.00 2.00 CASING P 10,065.00 INTI PRESSURE TEST 7" CASING AGAINST UPPER IPE RAMS TO 3500 PSI FOR 30 MIN - PUMP 4 BBLS, BLEED BACK 4 BELS - LOSE 90 PSI IN FIRST 15 MIN, 20 PSI IN SECOND 15 MIN -APPROVED BY WSUP, SEE ATTACHED DOCUMENTATION Printed 7/31/2018 9:01'.12AM *All depths reported in Drillers Depths' Common Well Name: 01-36 Event Type: DRL- ONSHORE (DON) Project: PBU Rig Name/No.: PARKER 272 North America - ALASKA - BP Operation Summary Report Start Date 6/13/2018 End Date. 7/1/2018 Site: 01 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Him Task Code (hr) 1400 - 16:00 2.00 DRILL P 16:00 - 18:00 18:00 - 19:00 2.00 DRILL P 1.00 DRILL P 19:00 - 20:00 1.00 DRILL P 2000 - 2030 0.50 DRILL P Page 22 of 31 AFE No X3-018YT-Cr(7,883,309.00) BPUOI: USA00006193 NPT Total Depth Phase Description of Operations (usft) 10,065.00 INT1 WASH DOWN TO TAG HARD CEMENT AT 9921' MD. DRILL OUT HARD CEMENT TO TAG PLUGS ON DEPTH AT 9975' MD. DRILL PLUGS AND HARD CEMENT IN SHOE TRACK FROM 9975' MD TO 10051' MD (10' FROM SHOE) - 8 MIN TO DRILL THROUGH PLUGS - 200 GPM, 1700-1800 PSI, 15 RPM, 8 KFT-LBS TRO, 10 KLBS WOB THROUGH CEMENT, VARYING PARAMETERS THROUGH PLUGS 10,065.00 INT1 DISPLACE WELL FROM OLD 10.7 PPG LSND TO NEW 8.5 PPG QUICKDRILL SOLIDS FREE DRILL -IN FLUID - PUMP 40 BBLS SEAWATER AND 40 BBLS HI -VIS SEAWATER SPACERSAHEAD OF NEW MUD - TOTAL WELL VOLUME = 330 BBLS - 300 GPM, 3200-3500 PSI ICP, 1800 PSI FCP, NO PIPE MOVEMENT - RECORD SPRS WITH NEW MUD WEIGHT -MONITOR BBL IN/OUT AND PRESSURE SCHEDULE AND FLOWCHECK WELL FOR 15 MIN AFTER"UNDERBALANCED" DISPLACEMENT (STATIC) _ 10,065.00 INT1 - DRILL OUT LAST 10' OF SHOE TRACK TO 10061' MD i - FLOWCHECK WELL FOR 15 MIN PRIOR TO DRILLING NEW FORMATION (STATIC) DRILL UP 4' RATHOLE TO 10065' MO. 20' NEW FORMATION TO 10085' MD 250 GPM, 1600 PSI, 20 RPM, 5 KFT-LBS TRO 10,065.00 INTI CIRCULATE BOTTOMS UP TO CONFIRM HOLE CLEAN AND EVEN MW IN/OUT - 300 GPM, 1800 PSI, NO PIPE MOVEMENT - LEAVE BIT OUTSIDE CASING WITH BENT HOUSING MOTOR. PULL UP INTO 7" CASING SHOE AFTER PUMPS DOWN. - MW IN/OUT = 8.5 PPG 10,065.00 INTI PERFORM FIT TO 10.4 PPG EMW - 8677' TVD, 8.5 PPG, 880 PgrWLIED PRESSURE - 1 BELS PUMPED, MONITOR 60 PSI BLEED OFF TO FORMATION FOR 10 MIN, BLEED BACK 1 BBLS TO RIG - TEST APPROVED BY ODE FOR INFINITE KICK TOLERANCE DURI (EXCEEDS 857 PSI REQUIRED) Printed 7/3112018 9:01:12AM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 23 of 31 Common Well Name: 01-36 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 6/13/2018 End Date: 7/1/2018 X3-018YT-C: (7,883,309.00 ) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00:OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 20:30 - 00:00 3.50 DRILL P 10,157.00 PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE BUILD SECTION THROUGH SAG RIVER AND SHUBLIK FORMATIONS FROM 10085' MD TO 10157' MD AT MIDNIGHT (72' IN 3.5 HRS = 20.5 FPH WITH CONNECTIONS) -30 FPH INSTANTANEOUS - 300 GPM, 2050/1900 PSI ON/OFF BTM, 30 RPM WHEN ROTATING, 5/4 KFT-LBS TRO ON/OFF BTM, UP TO 20 KLBS WOB - SLIDING COMMENTS: DIFFICULT SLIDING DUE TO SUSPECTED STABILIZER HANGING • UP NOTALLOWING WEIGHT TO BE TRANSFERED TO BIT - AVERAGE GASWATCH BACKGROUND = 10 UNITS, MAX = 457 UNITS (CONNECTION GAS) - MW /IN/OUT = 8.5 PPG, LOSSES =NONE - SURVEYING EVERY 30' FOR DLS >5° '- TOTAL DRILLING HOURS FOR DAY =3.3, SLIDING = 2.7, ROTATING =.6 - GEOLOGY NOTES = SAG RIVER CONFIRMED AT 10060'MD _ 6/27/2018 00:00 - 18:30 18.50 DRILL P 10,665.00 PROD? DIRECTIONAL DRILL 6-1/8" PRODUCTION HOLE BUILD SECTION FROM 10157' MD AT MIDNIGHT TO 10665'MD(508' IN 18.5 HRS=27 FPH WITH CONNECTIONS) - 25 FPH INSTANTANEOUS THROUGH SHUBLIK, ROP INCREASED IN ZONE 4 TO 80-100 FPH - 300 GPM, 2100/1950 PSI ON/OFF BTM, 30 RPM WHEN ROTATING, 7/4 KFT-LBS TRO ON/OFF BTM, UP TO 25 KLBS SLIDING, 20 KLBS WOB ROTATING -SLIDING COMMENTS: DIFFICULT SLIDING DUE TO SUSPECTED STABILIZER HANGING UP NOTALLOWING WEIGHT TO BE TRANSFERED TO BIT - AVERAGE GASWATCH BACKGROUND = 50 UNITS, MAX =1295 UNITS - MW/IN/OUT = 8.5 PPG, LOSSES = NONE - SURVEYING EVERY 30' FOR DLS >5° -GEOLOGY NOTES: FORMATIONS COMMING IN -10' TVD HIGH TO FROG, LAND BUILD AND _ INVERT 4' TVD HIGH OF PLAN 1830 - 1930 1.00 DRILL P 10,665 00 PROD1 CIRCULATE HOLE CLEAN WITH i BOTTOMS UP - 315 GPM, 2100 PSI, NO ROTATION WORK PIPE SLOWLY WITH MOTOR ORIENTED HIGHSIDE - MONITOR WELL FOR 10 MIN (STATIC) 1930 - 0000 4.50 DRILL P 10,665.00 PROD1 PULL OUT OF THE HOLE ON ELEVATORS FROM BOTTOM AT 10665' MD TO THE TOP OF THE BHA AT 140' MD - MONITOR WELL FOR 10 MIN AT THE 7" CASING SHOE (STATIC) AND AT THE TOP OF THE BHA (STATIC) - MUD WEIGHT = 8.6 PPG - PU/SO WEIGHT 185/145 KLBS AT 10665' MD 6/28/2018 0000 - 01:30 1.50 DRILL P 10,665.00 PROD1 LAY DOWN 6-1/8" PRODUCTION HOLE MOTOR BHA FROM 140' TO SURFACE - BIT GRADE: 1 -1 -IN GAGE Printed 7/3112018 9t01:12AM *All depths reported in Drillers Depths' Common Well Name. 01-36 Event Type: DRL- ONSHORE (DON) Proiect: PBU North America - ALASKA - BP Operation Summary Report Start Date: 6/13/2018 End Date. 7/1/2018 Site: 01 AFE No X3-018YT-0. (7,883,309 00 ) Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00:00PM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ lush) 01:30 - 02:00 0.50 DRILL P 10,665.00 PROD1 CLEAN AND CLEAR RIG FLOOR Page 24 of 31 Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths` PERFORM WEEKLY BOPE FUNCTION TEST 02:00 - 04:30 2.50 DRILL P 10,665.00 PROD? MAKE UP 6-1/8" PRODUCTION HOLE RSS BHA TO 169' MD - 6-1/8" HYCALOG SK613 PDC BIT, AUTO TRAK EXACT,ONTRAK '(GAM/RES/PRESNSS/SURVEY), LITHOTRAK (DENSITY/NEUTRON/CALIPER), STARTRAK - (HD IMAGE) - PLUG IN AND TEST FOR CONNECTIVITY BETWEEN TOOLS ON SURFACE INSTALL SOURCES IN_LITHOTRAK 04:30 - 0530 1.00 DRILL N 10,665.00 PROD1 RUN IN THE HOLE WITH THE 6-1/8" PRODUCTION HOLE RSS BHA ON 4" DRILL PIPE FROM 169' MD TO 638' MD - MONITOR THE WELL FOR 10 MIN (STATIC) - SHALLOW HOLE TEST THE DIRECTIONAL TOOLS WITH 300 GPM, 1500 PSI - PULSE FROM TOOL INDICATES WRONG COLLAR PICKED UP, TWO PULSERS IN THE 'HOLE _ 05:30 - 0600 0.50 DRILL N 10,665.00 PROD1 PULL OUT OF HOLE TO FROM 638' MD TO THE TOP OF THE BHAAT 168' MD TO CHANGE MWD COLLAR - LAY DOWN COLLAR WITH PROBE, PICK UP FLEX COLLAR 06:00 - 12:00 6.00 DRILL P 10,665.00 PROW RUN IN THE HOLE WITH THE 6-1/8" PRODUCTION HOLE RSS BHA ON 4" DRILL PIPE FROM 169' MD TO 9997' MD - SHALLOW HOLE TEST THE DIRECTIONAL TOOLS AT 638' MD AND 3488' MD WITH 300 GPM, 1050 PSI AND 1200 PSI (GOOD TESTS) _ 12:00 - 13:00 1.00 DRILL P 10,665.00 PRODt CUTAND SLIP 50' OF DRILLING LINE -CALIBRATE BLOCK HEIGHT WITH AMPHION AND BAKER_ 1300 - 1400 1.00 DRILL P 10,665.00 PROD? INITIATE CIRCULATION TO MADD PASS THE PRODUCTION HOLE BUILD SECTION - OBSERVE SPIKE IN GAS ON GASWATCH (GAS ENTRAINED IN MUD) TO 738 UNITS AND 5%-17% ON LEL SENSORS - SHUT DOWN THE PUMPS AND CHECK FOR FLOW (WELL STATIC) AND NO GAS CUT IN MUD WEIGHT - WSL MADE NOTIFICATIONS TO WSUP - CIRCULATE BOTTOMS UP WITH ADDITIONAL GAS WATCH SPIKES UP TO 635 UNITS WITH 0% LEL - 38 UNITS OF GAS ON GASWATCH AFTER BOTTOMS UP 14:00 - 19:00 5.00 DRILL P 10,665.00 PRODI MADD PASS THE PRODUCTION HOLE BUILD SECTION FROM 10055' MD TO TO AT 10665' MD -175 FPH, 300 GPM, 1850 PSI, NO ROTATION - OBSERVE UP TO 389 UNITS ON GASWATCH AND 0% LEL WHILE PERFORMING THE MADD PASS - NO GAS OBSERVED AFTER THE REVERT POINTAT 10421' MD Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Common Well Name: 01-36 Event Type: DRL- ONSHORE (DON) Start Date: 6/13/2018 End Date: 7/1/2018 Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud DateRme: 6/15/2018 12:00:OOPM Page 25 of 31 AFE No X3-018YT-C'. (7,883,309 00 ) Rig Release: 7/6/2018 Rig Contractor PARKER DRILLING CO. Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) BPUOI: USA00006193 Date From - To Hm Task Code NPT Total Depth Phase Description of Operations _ (hr) _ _ _ (usfQ___ 19:00 - 22:00 3.00 DRILL P 10,750.00 PROD1 DIRECTIONAL DRILL 6-1/8" PRODUCTION HOLE SECTION FROM 10665' MD TO 10750' MD - INSTANTANEOUS ROP UP TO 30 FPH, REDUCE ROP FOR DIRECTIONAL CONTROL - 300 GPM, 1900 PSI ON/OFF BOTTOM - 120 RPM, 7 KFT-LBS TORQUE ON BOTTOM, 5 KFT-LBS TORQUE OFF BOTTOM, UP TO 10 KLBS WOB - PU = 120 KLBS, $O = 150 KLBS, ROT = 160 KLBS - SURVEY EVERY 30 FT FOR DLS >W AND EVERY STAND FOR DLS <5° -NO LOSSES WHILE DRILLING AHEAD - SOFTSPEED ENABLED AND NOVOS DISABLED UNTIL DOWNLINKING BECOMES LESSFREQUENT -MUD WEIGHT IN/OUT=8.6 PPG - GAS WATCH: AVG BACKGROUND 0 UNITS, MAX 0 UNITS - UNABLE TO GET THE DLS NEEDED (7° DLS), INCREASE BUILD FORCE ON AUTOTRAK WHILE DRILLING STAND DOWN TO MAXIMUM _ IN HOLD MODE WITH LITTLE TO NO RESULTS 2200 - 0000 2.00 DRILL N 10,765.00 PROD1 TROUBLESHOOT AUTOTRAK BAKER TECH SUPPORT TROUBLESHOOT iAUTOTRAK ENABLE STEERING MODE ON AUTOTRAK VATH 100% BUILD FORCE DOWN - DRILL 15' TO 10765' MD, NEAR BIT INC SHOWING -8° DLS -CALCULATE BUILD FORCE NEEDED FOR 7° DLS AND DOWNLINK - DECISION MADE TO KEEP THE AUTOTRAK IN STEERING MODE FOR DROP SECTION UNTIL LANDED IN THE SAG RIVER Printed 7/312018 9:01:12AM *All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Common Well Name: 01-38 Event Type: DRL- ONSHORE(DON) Start Date: 6/13/2018 End Date: 7A/2018 Project: PBU Site: 01 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Hm Task Cade NPT Total Depth _(_hr) _ _. _ _ (usft) 6/29/2018 00:00 - 12:00 12.00 DRILL P 11.131.00 Page 26 of 31 AFE No X3-018YT-C:(7,883,309.00) BPUOI: USA00006193 Phase Description of Operations PROD1 DIRECTIONAL DRILL 6-1/8" PRODUCTION HOLE SECTION FROM 10765' MD TO 11 131'MD - INSTANTANEOUS ROP UP TO 30-120 FPH, ADJUST ROP AS NEEDED FOR DIRECTIONAL CONTROL - 300 GPM, 1950 PSI ON/OFF BOTTOM - 120 RPM, 6 KFT-LBS TORQUE ON BOTTOM, 5 KFT-LBS TORQUE OFF BOTTOM, UP TO 12 KLBS WOB - PU = 183 KLBS, SO = 150 KLBS, ROT = 160 KLBS - SURVEY EVERY 30 FT FOR DLS >S' AND EVERY STAND FOR DLS -V - NO LOSSES WHILE DRILLING AHEAD SOFTSPEED ENABLED AND NOVOS DISABLED - MUD WEIGHT IN/OUT = 8.6 PPG - GAS WATCH: AVG BACKGROUND 53 UNITS, MAX 507 UNITS, TROUBLESHOOT GASWATCH, DISCOVERED VACUUM LINE PLUGGED, BLOW DOWN LINE, NO ISSUES WITH GAS WATCH AFTER BLOWING DOWN THE VACUUM LINE DIRECTIONAL NOTES: ONE RIB (OUT OF 3) ON THE AUTOTRAK FAILED MAKING DIRECTIONAL WORK DIFFICULT, LOWER ROP ALLOWS THE TOOL TO PERFOM MORE EFFICIENTLY WITH ONLY 2 RIBS WORKING Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths* Printed 7/312018 9:01:12AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 27 of 31 Operation Summary Report Common Well Name: 01-36 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 6/132018 End Date: 7/1/2018 X3-018YT-C: (7,883.309.00) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00:OOPM Rig Release 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Alive datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From- To Him Task Code NPT Total Depth Phase Description of Operations (hr) 12:00 - 00:00 12.00 DRILL P 11,798.00 PROD1 DIRECTIONAL DRILL 6-1/8" PRODUCTION HOLE SECTION FROM 11131' MD TO 11798' MD - INSTANTANEOUS ROP UP TO 30-150 FPH, ADJUST ROPAS NEEDED FOR DIRECTIONAL CONTROL - 250 GPM, 1580 PSI ON/OFF BOTTOM - 120 RPM, 6 KFT-LBS TORQUE ON BOTTOM, 5 -KFT-LBS TORQUE OFF BOTTOM, UP TO 14 KLBS WOB - PU = 185 KLBS, SO = 145 KLBS, ROT = 162 KLBS i - SURVEY EVERY 30 FT FOR DLS >5° AND EVERY STAND FOR OILS <5' - NO LOSSES WHILE DRILLING AHEAD '- SOFTSPEED ENABLED AND NOVOS DISABLED -MUD WEIGHT IN/OUT =8.7 PPG - GAS WATCH: AVG BACKGROUND 50-100 UNITS, MAX 670 UNITS, OBSERVED INCREASE INAVERAGE BACKGROUND GAS (-300 UNITS) FROM -11000' MD TO -11500' MD WITH THE PEAK BEING 670 UNITS '- DIRECTIONAL NOTES: ONE RIB (OUT OF 3) ON THE AUTOTRAK FAILED MAKING 'DIRECTIONAL WORK DIFFICULT, LOWER ROP ALLOWS THE TOOL TO PERFOM MORE EFFICIENTLY WITH ONLY 2 RIBS WORKING - GEOLOGY NOTES: OBSERVE DROP IN RESITIVITY TO -4 OHM AT 11270' MD (ONLY INDICATION OF PLANNED FAULT AT 11235' MD), DECISION MADE TO INCREASE INCLINATION TO FIND THE BOTTOM OF THE "RABBIT EARS" IN THE TOP OF THE SAG RIVER, OBSERVE THE BOTTOM OF THE "RABBIT EARS" AT 11775' MD (8695' TVD), REVERT AND LEVEL OUT TO 89.5° INC WHEN RESITIVITY = -6 OHM Printed 7/312018 9:01:12AM 'All depths reported in Drillers Depths' Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths" North America - ALASKA - BP Page 28 of 31 Operation Summary Report Common Well Name: 01-36 AFE No Event Type: DRL- ONSHORE (DON) Start Date. 6/13/2018 End Date: 7/1/2018 X3-01BYT-C: (7,883,309,00) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00:OOPM Rig Release: 7/6/2018 Rig Contractor. PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _ (hr) (usft) 6/30/2018 00:00 - 12:00 12.00 DRILL P 12,716.00 PROD1 DIRECTIONAL DRILL 6-1/8" PRODUCTION HOLE SECTION FROM 11 798'MD TO 12716' MD - 918' IN 12 HOURS = 77 FPH WITH CONNECTIONS - INSTANTANEOUS ROP UP TO 50-150 FPH, ADJUST ROP AS NEEDED FOR DIRECTIONAL CONTROL - 300 GPM, 2080 PSI ON/OFF BOTTOM -120 RPM, 8 KFT-LBS TORQUE ON BOTTOM, 4 KFT-LBS TORQUE OFF BOTTOM, UP TO 14 KLBS WOB - PU = 183 KLBS, SO = 143 KLBS, ROT = 159 KLBS - SURVEY EVERY 30 FT FOR DLS >5" AND EVERY STAND FOR DLS <5° - NO LOSSES WHILE DRILLING AHEAD '- SOFTSPEED ENABLED AND NOVOS DISABLED - MUD WEIGHT IN/OUT = 8.8 PPG, DECISION MADE TO WEIGHT UP TO 8.8 PPG DUE TO HIGH BACKGROUND GAS GAS WATCH: AVG BACKGROUND 50.500 UNITS, MAX 909 UNITS, BACKGROUND GAS 'DECREASED TO -50 UNITS AFTER WEIGHTING UP TO 8.8 PPG - DIRECTIONAL NOTES: ONE RIB (OUT OF 3) ON THE AUTOTRAK FAILED MAKING DIRECTIONAL WORK DIFFICULT, LOWER ROP ALLOWS THE TOOL TO PERFORM MORE EFFICIENTLY WITH ONLY 2 RIBS WORKING - GEOLOGY NOTES: DID NOT SEE ANY INDICATION OF FAULT #3 AT -12383' MD Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths" North America - ALASKA- BP Operation Summary Report Page 29 of 31 Common Well Name 01-36 AFE No Event Type. DRL- ONSHORE (DON) Start Date: 6/13/2018 End Date: 7/1/2018 X3-018YT-C: (7,883,309.00 ) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00 OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) _ _ (usft) 12:00 - 00:00 12.00 DRILL P 13,398.00 PROW _ _ _ DIRECTIONAL DRILL 6-118" PRODUCTION HOLE SECTION FROM 12718' MD TO 13398' MD - 682' IN 12 HOURS = 57 FPH WITH CONNECTIONS - INSTANTANEOUS ROP UP TO 75-100 FPH, ADJUST ROP AS NEEDED FOR DIRECTIONAL CONTROL - 300 GPM, 2200 PSI ON/OFF BOTTOM '- 120 RPM, 8 KFT-LBS TORQUE ON BOTTOM, 5 KFT-LBS TORQUE OFF BOTTOM, UP TO 14 KLBS WOB - PU = 200 KLBS, SO = 140 KLBS, ROT = 165 KLBS - SURVEY EVERY 30 FT FOR DLS >5' AND EVERY STAND FOR DES <5° - 5-10 BPH LOSSES WHILE DRILLING AHEAD '- SOFTSPEED ENABLED AND NOVOS DISABLED -MUD WEIGHT IN/OUT=8.8 PPG - GAS WATCH: AVG BACKGROUND 200-300 UNITS, MAX 478 UNITS, BACKGROUND GAS INCREASED TO 200-300 UNITS AFTER ENTERING ZONE 413034' MD -- DIRECTIONAL NOTES: ONE RIB (OUT OF 3) ON THE AUTOTRAK FAILED MAKING DIRECTIONAL WORK DIFFICULT, LOWER ROP ALLOWS THE TOOL TO PERFORM MORE EFFICIENTLY WITH ONLY 2 RIBS WORKING - GEOLOGY NOTES: SAG IS WATER SWEPT FOR MOST OF THE LATERAL, DECISION MADE TO TOE DOWN TO FIND THE OIL/WATER CONTACT IN ZONE 4 Printed 7/3112018 9:01 12AM 'All depths reported in Drillers Depths` North America - ALASKA - BP Operation Summary Report Common Well Name. 01-36 PROD1 DIRECTIONAL DRILL 6-1/8" PRODUCTION Event Type: DRL- ONSHORE (DON) Start Date: 6/13/2018 Project: PBU - 227' IN 5 HOURS = 45 FPH WITH Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15 Rig Contractor: PARKER DRILLING CO. ADJUST ROP AS NEEDED FOR DIRECTIONAL Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Him Task Code - 120 RPM, 9 KFT-LBS TORQUE ON BOTTOM, 6 (hr) KFT-LBS TORQUE OFF BOTTOM, UP TO 14 7/1/2018 00:00 - 05:00 5.00 DRILL P 05:00 - 06:30 1.50 DRILL P 0630 - 0900 2.50 DRILL P 09:00 - 10:00 1.00 DRILL P End Date: 7/1/2018 NPT Total Depth Phase (usft) AFE No K3-018YT-C: (7,883,309.00 ) BPUOI: USA00006193 Description of Operations Page 30 of 31 13,625.00 PROD1 DIRECTIONAL DRILL 6-1/8" PRODUCTION HOLE SECTION FROM 13398' MD TO 13625' MD - 227' IN 5 HOURS = 45 FPH WITH CONNECTIONS - INSTANTANEOUS ROP UP TO 25-100 FPH, ADJUST ROP AS NEEDED FOR DIRECTIONAL 'CONTROL, ROP -25 FPH THROUGH ZONE - 300 GPM, 2150 PSI ON/OFF BOTTOM - 120 RPM, 9 KFT-LBS TORQUE ON BOTTOM, 6 KFT-LBS TORQUE OFF BOTTOM, UP TO 14 KLBS WOB - PU = 195 KLBS, SO = 151 KLBS, ROT = 164 KLBS - SURVEY EVERY 30 FT FOR DLS >5° AND EVERY STAND FOR DLS <5° -5-10 BPH LOSSES WHILE DRILLING AHEAD '- SOFTSPEED ENABLED AND NOVOS DISABLED - MUD WEIGHT IN/OUT = 8.8 PPG '- GAS WATCH: AVG BACKGROUND 200-300 UNITS, MAX 478 UNITS, BACKGROUND GAS INCREASED TO 200-300 UNITS AFTER ENTERING ZONE 4 13034' MD - DIRECTIONAL NOTES: ONE RIB (OUT OF 3) ON THE AUTOTRAK FAILED MAKING DIRECTIONAL WORK DIFFICULT, LOWER ROP ALLOWS THE TOOL TO PERFORM MORE EFFICIENTLY WITH ONLY 2 RIBS WORKING - GEOLOGY NOTES: OBSERVED THE OILANATER CONTACT IN ZONE 2 AT 13521' MD (9062' TVD), DRILL ADDITIONAL 104' MO TO ALLOW FOR SHOE TRACKAND STILL BE ABLE TO PERF NEAR THE OILNJATER CONTACT 13,625.00 PROD? CIRCULATE HOLE CLEAN WITH 1-1/2X BOTTOMS UP - 300 GPM, 2150 PSI - 180 RPM, 7K TORQUE - PUMP 35 BBL HIGH VIS SWEEP, NO INCREASE IN CUTTINGS BACKAT SHAKERS - MONITOR WELL FOR 10 MIN (<5 STATIC LOSSES) 13,625.00 PROD1 PULL OUT OF THE HOLE FOR PLANNED SHORT TRIP FROM BOTTOM AT 13625' MD TO THE T' CASING SHOEAT 10061' MD - WORKED THROUGH TIGHT SPOTAT 12660' MD WITH 30 KLBS OVER STRING WEIGHT - MUD WEIGHT IN/OUT 8.8 PPG - PU 190 KLBS, SO 150 KLBS PULLING OFF BOTTOM 13,625.00 PROD1 CIRCULATE BOTTOMS UP - 350 GPM, 2300 PSI - 60 RPM, 3K TORQUE - RECIPROCATE FULL STAND WHILE CIRCULATING - MONITOR WELL FOR 30 MIN FOR POTENTIAL TRIP GAS MIGRATION (4 BPH STATIC LOSS RATE) -PERFORM DERRICK INSPECTION Printed 7/3112018 9:01:12AM *All depths reported in Drillers Depths` North America - ALASKA - BP Page 31 of 31 Operation Summary Report Common Well Name: 01-36 - 15:30 1.00 AFE No Event Type: DRL- ONSHORE (DON) Start Date', 6/13/2018 End Dale. 7/1/2018 X3-01BYT-C: (7,883,309,00) Project: PBU Site: 01 OUT OF THE HOLEAT 1266_0' MD Rig Name/No.: PARKER 272 Spud Date/Time: 6/152018 12:00 DOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. -180 RPM, 7 KFT-LBS TORQUE BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) THE GAS WATCH AT BOTTOMS UP Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) PROD1 PULL OUT OF THE HOLE FROM BOTTOM AT lush) 13625' MD TO THE T' CASING SHOE AT 10061' 10:00 - 12:00 2.00 DRILL P 13,625.00 PROD? RUN IN THE HOLE TO BOTTOM TO 1200 - 1330 1.50 DRILL 1330 - 1530 2.00 DRILL 15:30 - 15:30 1.00 DRILL 1630 - 2000 3.50 DRILL 20:00 - 22:00 2.00 DRILL DRILLING EVENT COMPLETE- SEE COMPLETION REPORT #1 Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths' COMPLETE SHORT TRIP FROM THE 7" CASING SHOE AT 10061' MD TO BOTTOM AT 13625' MD i- OBSERVED 10K UNDER STRING WEIGHTAT THE TIGHT SPOT OBSERVED WHILE PULLING OUT OF THE HOLEAT 1266_0' MD P 13,625.00 PROD1 CIRCULATE 2X BOTTOMS - 350 GPM, 2660 PSI -180 RPM, 7 KFT-LBS TORQUE - OBSERVED UP TO 3000 UNITS OF GAS ON THE GAS WATCH AT BOTTOMS UP - MONITOR WELL PRIOR TO PULLING OFF _ BOTTOM (<5 STATIC LOSSES) P 13,625.00 PROD1 PULL OUT OF THE HOLE FROM BOTTOM AT 13625' MD TO THE T' CASING SHOE AT 10061' ,MD - NO TIGHT SPOTS OBSERVED WHILE TRIPPING THROUGH OPEN HOLE - MUD WEIGHT IN/OUT 8.8 PPG - PU 190 KLBS, SO 150 KLBS PULLING OFF BOTTOM - MONITOR WELL AT THE 7" CASING SHOE (<5 _-STATIC LOSSES) P 13,625.00 PROD? CIRCULATE 1X BOTTOMS - 350 GPM, 2260 PSI - 80 RPM, 2 KFT-LBS TORQUE -PUMP DRY JOB DROP 2-3/8" OD DRIFT P 13,625.00 PROD1 PULL OUT OF THE HOLE FROM THE 7" CASING SHOE AT 10061' MD TO THE TOP OF THE BHAAT 168' MD - MONITOR WELL PRIOR TO PULLING NON-SHEARABLES INTO BOP STACK (<5 STATIC LOSSES) P 13,625.00 PROD? LAY DOWN 6-1/8" PRODUCTION HOLE BHA FROM 168' MD TO SURFACE - BIT GRADE: 8-8-RO-IN GAGE - CLEAN AND CLEAR RIG FLOOR DRILLING EVENT COMPLETE- SEE COMPLETION REPORT #1 Printed 7/31/2018 9:01:12AM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: 01-36 Event Type: COM- ONSHORE(CON) Start Date: 711/2018 End Date: 7/6/2018 Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/time: 6/15/2018 12:00:OOPM Active datum: 01-36 ACTUAL Der @88.70usft (above Mean Sea Level) Date From - To Hm Task Code (hr) 7/1/2018 22:00 - 23:00 1.00 CASING P 23:00 - 00:00 1.00 CASING P 7/2/2018 00:00 - 0530 5.50 CASING P 05:30 - 06:30 1.00 CASING P 06:30 - 10:30 4.00 CASING P NPT Total Depth Phase (usft) Page 1 of 8 AFE No X3-018YT-C'. (2,722,188.00) Rig Release: 7/6/2018 BPUOI: USA00006193 Description of Operations 13,625.00 RUNPRD RIG UP CASING RUNNING TOOLS FOR LINER Printed 7/312018 9a 01 57AM 'AII depths reported in Drillers Depths' RUN - RIG UP DOUBLESTACK TONGS WITH TORQUE TURN, SLIP TYPE ELEVATORS, AIR SLIPS - MAKE UP VAMTOP XO TO FOSV - VERIFY PIPE COUNT IN PIPE SHED 13,625.00 RUNPRD RUN 4-1/2", 12.6#, 13CR85 VAMTOP PRODUCTION LINER TO 426' MD - FLOW CHECK WELL PRIOR TO RUNNING IN HOLE (<5 BPH LOSSES) - MAKE UP SHOE TRACK (BAKERLOK CONNECTIONS) AND CHECK FLOATS (PASS) - APPLY JET LUBE SEAL GUARD DOPE AND TORQUE TURN ALL VAMTOP CONNECTIONS TO OPT MU TORQUE 4440 FT -LBS. MAKE UP JOINTS WITH DOUBLE STACK TONGS - RUNNING SPEED IN CASED HOLE = 90 FPM - VAM REPRESENTATIVE VERIFY TORQUE -TURN GRAPHS AND INSPECT CONNECTIONS IF NECESSARY, ALL CONNECTIONS GOOD - RUN (164) 4-1/2" X 5-3/4" CENTRALIZERS (SHOE TRACK, 2 PER JOINT ON 1-81). ONE FLOATING BETWEEN STOP RINGS 4'AND 10' FROM PIN, AND ONE LOCKED DOWN 13' FROM BOX _ - FILL LINER ON FLY 13,625.00 RUNPRD RUN 4-1/2", 12.6#, 13CR85 VAMTOP PRODUCTION LINER FROM 42V MD TO TOTAL LINER LENGTH OF 3733' MD - APPLY JET LUBE SEAL GUARD DOPE AND TORQUE TURN ALL VAMTOP CONNECTIONS TO OPT MU TORQUE 4440 FT -LBS. MAKE UP JOINTS WITH DOUBLE STACK TONGS - RUNNING SPEED IN CASED HOLE = 90 FPM - VAM REPRESENTATIVE VERIFY TORQUE -TURN GRAPHS AND INSPECT CONNECTIONS IF NECESSARY, ALL CONNECTIONS GOOD - RUN (164) 4-1/2" X 5-3/4" CENTRALIZERS (SHOE TRACK, 2 PER JOINT ON 1-81). ONE FLOATING BETWEEN STOP RINGS 4'AND 10' FROM PIN, AND ONE LOCKED DOWN 13' FROM BOX - FILL LINER ON FLY - PU 71K, SO 70K TOTAL LINER WEIGHT, 272 BLOCK WEIGHT 35 KLBS MAKE UP LINER HANGER/PACKER ASSEMBLY - ADD PAL MIX - MUD WEIGHT: 8.8 PPG IN, 8.8 PPG OUT - MUD LOSSES WHILE RIH: -4 BPH 13,625.00 RUNPRD CIRCULATE 2X BOTTOMS UP - 6 BPM, 445 PSI _- NO _GAS OBSERVED AT SURFACE 13,625.00 RUNPRD RUN IN HOLE WITH THE 4-1/2" PRODUCTION LINER ON 4" OP FROM 3733' MD TO 7" CASING SHOE AT 10061' MD Printed 7/312018 9a 01 57AM 'AII depths reported in Drillers Depths' Common Well Name: 01-36 Event Type: COM- ONSHORE (CON) Start D. Project: PBU Site: 01 North America - ALASKA - BP Operation Summary Report AFE No 7/7/2018 End Date'. 7/6/2018 X3-018YT-C'. (2,722,188 00 ) Page 2 of 8 Rig Name/No.: PARKER 272 Spud DateRime: 6/15/2018 12:00 OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00008193 Active datum: 01-36 ACTUAL Det @88.70us6 (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ _(usfl)_. 10:30 - 11:30 1.00 CASING P 13,625.00 RUNPRD CIRCULATE BOTTOMS UP - 5 BPM, 675 PSI - NO GAS OBSERVED AT SURFACE 11:30 - 15:30 4.00 CASING P 13625.00 RUNPRD RUN IN HOLE WITH THE 4-1/2" PRODUCTION 15:30 - 19:00 3.50 CASING LINER ON 4" DP FROM THE 7" CASING SHOE AT 10061' MD TO PLANNED SET DEPTH AT 13623' MD `-CIRCl7tA1 DOWN 4 STANDS FROM 11902' MD TO 12281' MD TO GET BOTTOMS UP HALF WAY THROUGH OPEN HOLE, 5 BPM, 875 PSI - NO GAS OBSERVED AT SURFACE RUN IN THE HOLE AT 75-90 .- NO ISSUES WHILE RUNNING IN OPEN HOLE - RIG UP CEMENT HEAD - FINAL PU 190 KLBS, SO 145 KLBS, 272 BLOCK WEIGHT 35 KLBS P 13,625.00 RUNPRD STAGE UP TO CEMENTING RATE IN 1 BPM INCREMENTS TO FINAL CIRCULATING RATE OF S BPM. - @ 2 BPM, 475 PSI - @ 3 BPM, 620 PSI -@4 BPM, 830 PSI - @ 5 BPM, 1100 PSI - INITIAL PRESSURE AT CEMENTING RATE: 1100 PSI - FINAL PRESSURE AT CEMENTING RATE AFTER HOLE CONDITIONED: 975 PSI - CIRCULATE TOTAL OF 5 TIMES BOTTOMS -UP - RECIPROCATED PIPE 40 FT AT SURFACE AT 10 FT/MIN - OBSERVE UP TO 581 UNITS OF GASAT THE FIRST BOTTOMS UP WITH 0% LEL - MUD LOSSES: 0 BPH 901.57AM *All depths reported in Drillers Depths' North America - ALASKA- BP Operation Summary Report Page 3 of 8 Common Well Name: 01-36 FOLLOWS: AFE No Event Type: COM- ONSHORE(CON) Start Date: 7/1/2018 End Date: 716/2018 X3-018YT-C:(2,722,188.00) Project: PBU Site: 01 SPACER @ 3-4 BPM (ONLY 3-4 BPM DUE TO Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12'.00:OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. 5 3 1.17 BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) - DROP DRILL PIPE WIPER DART Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) - 146 BBLS DISPLACED AT 5 BPM: CAUGHT (usft) PRESSURE AT 73 BBL INTO DISPLACEMENT 19:00 - 21:00 2.00 CASING P 13,625.00 RUNPRD CEMENT4-1/2"PRODUCTION LINER AS 21.00 - 21:30 0.50 CASING P 21:30 - 22:00 0.50 CASING P 2200 - 22.30 0.50 CASING P Pnnted 7/31/2018 9:01 57AM 'All depths reported in Drillers Depths' FOLLOWS: - REVIEWED PRESSURE CROSSCHECK - FILL LINES WITH WATER AND PRESSURE TEST TO 4800 PSI FOR 5 MINUTES - PUMP 40 BBLS OF 12 PPG MUDPUSH II SPACER @ 3-4 BPM (ONLY 3-4 BPM DUE TO ISSUES MIXING MP ON THE FLY), 550-330 PSI - PUMP 86 BBLS OF 15.8 PPG CLASS G TAIL 5 3 1.17 CU.FT/SK) - DROP DRILL PIPE WIPER DART PERFORM DISPLACEMENT WITH SLB CEMENT UNIT - 146 BBLS DISPLACED AT 5 BPM: CAUGHT PRESSURE AT 73 BBL INTO DISPLACEMENT ICP 700 PSI, FCP 2100 PSI, SLOWED TO 3 'BPM FOR -10 BBL TO OBSERVE PLUG LATCH, OBSERVED PLUG LATCH 101.6 BBL INTO DISPLACEMENT -11.25 BBLS DISPLACED AT 2 BPM: ICP 1200 PSI, FCP 1450 PSI '- DISPLACEMENT FLUID: 157.4 BBLS OF 8.8 . PPG QUICKDRIL-N - RECIPROCATE PIPE 10 FT (STRETCH +5') AT SURFACE DURING DISPLACEMENT UNTIL PRESSURES REACHED -1600 PSI (PRESSURE LIMIT FOR HANGER) - TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE: 5 BBL& - INCREASE PRESSURE 500 PSI OVER BUMP PRESSURE TO 1900 PSI, HOLD FOR 4 MIN AND BLEED OFF TO CHECK FLOATS (FLOATS HOLDING) -CIP @21:07 13,625.00 RUNPRD SETHANGER - PRESSURE UP TO 2800 PSI - SET DOWN 50K TO CONFIRM HANGER SET - PRESSURE UP TO 3800 PSI HOLD FOR -1 MIN AND BLEED OFF PRESSURE - PU TO EXPOSE DOG SUBAND SET DOWN ON LINER TOP BOK, 20 RPM, OBSERVE INDICATION OF PACKER SETTING AT 30K - PRESSURE UP TO 1300 PSI AND PU TO REMOVE RS PACK -OFF AND CIRCULATE EXCESS CEMENT OFF LINER TOP - PU RUNNING TOOLABOVE LINER TOPAND MARK NO-GO - LINER SET AT 13623' MD, LINER TOP SET AT, 9890' MD 13,625.00 RUNPRD CIRCULATE OUT EXCESS CEMENTAND DISPLACE WELL TO 8.5 PPG SEAWATER - 14 BPM, 3800-3250 PSI - PUMP 35 BBL HIGH VIS SWEEP WITH NUTPLUG --23 BBLS OF EXCESS CEMENT TO SURFACE ON BOTTOMS UP 13,625.00 RUNPRD RIG DOWN THE CEMENT HEAD AND CEMENTING EQUIPMENT Pnnted 7/31/2018 9:01 57AM 'All depths reported in Drillers Depths' *All depths reported in Drillers Depths- North America - ALASKA - BP Page 4 of 8 08:00 - 10:00 2.00 PERFOB P 13,625.00 Operation Summary Report Common Well Name: 01-36 PERFORATING ASSEMBLY ON 4" DRILL PIPE STANDS FROM 1374' MD TO 4704' MD AFE No Event Type: COM- ONSHORE (CON) — PU 90 KLBS, SO 87 KLBS AT 4704' MD Start Date: 7/1/2018 End Date: 7/6/2018 X3-018YT-C: (2,722,188 00 ) Project: PBU Site: 01 10:00 - 11:00 1.00 CASING P 13,625.00 OTHCMP PRESSURE TEST 4-1/2" PRODUCTION LINER Rig Name/No.: PARKER 272 Spud Daterrime: 6/15/2018 12:00 OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. - TEST MET BP TEST CRITERIA BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def ®88.70usft (above Mean Sea Level) 11:00 - 14:30 3.50 PERFOB P 13,625.00 OTHCMP CONTINUE RUNNING IN THE HOLE WITH Date From - To Hn; Task Code NPT Total Depth Phase Description of Operations _ (hr) - PU 180 KLBS, SO 153 KLBS AT 11200' MD (usft) _ - MUD WEIGHT IN/OUT = 8.5 PPG 22:30 - 00:00 1.50 CASING P 13,625.00 RUNPRD PULLOUT OF THE HOLE FROM THE LINER PERFORATE WELL WITH HALLIBURTON 2-7/8" TOP AT 9890' MD TO 9217' MD PER HALLIBURTON PROCEDURE - MONITOR WELL FOR 10 MIN _ TO SPACE OUT GUNS AT 11231' MD - 8.5 PPG SEAWATER IN THE HOLE 7/3/2018 00:00 - 04:00 4.00 CASING P 13,625.00 RUNPRD PULL OUT OF THE HOLE FROM 9217' MD TO FIRING AT SURFACE. SURFACE - 10070' - 1010 3 - 8.5 PPG SEAWATER IN THE HOLE 2-7/8" JRC VANN GUN DESCRIPTIONS, GUN LAY DOWN LINER RUNNING TOOL 04:00 - 05:00 1.00 PERFOB P 13,625.00 OTHCMP RIG UP TO RUN PERF GUNS 0.37" ENTRY HOLE DIAMETER 15:30 - 16:00 0.50 PERFOB P 13,625.00 INSTALL BAILS AND ELEVATORS 05:00 - 08:00 3.00 PERFOB P 13,625.00 1 OTHCMP MAKE UP HES 2-7/8" MAX FORCE *All depths reported in Drillers Depths- PERFORATING GUNS AND 2-7/8" PAC DRILL _ PIPE TO 1374' MID 08:00 - 10:00 2.00 PERFOB P 13,625.00 OTHCMP CONTINUE RUNNING IN THE HOLE WITH PERFORATING ASSEMBLY ON 4" DRILL PIPE STANDS FROM 1374' MD TO 4704' MD — PU 90 KLBS, SO 87 KLBS AT 4704' MD -MUD WEIGHT IN/OUT=8.5 PPG - MONITOR DISPLACEMENT WITH TRIP TANK 10:00 - 11:00 1.00 CASING P 13,625.00 OTHCMP PRESSURE TEST 4-1/2" PRODUCTION LINER TO 3500 PSI FOR 30 CHARTED MIN - LOST < 15 PSI OVER THE ENTIRE TEST - TEST MET BP TEST CRITERIA - SEE ATTACHED TEST CHART 11:00 - 14:30 3.50 PERFOB P 13,625.00 OTHCMP CONTINUE RUNNING IN THE HOLE WITH PERFORATING ASSEMBLY ON 4" DRILL PIPE STANDS FROM 4704' MD TO 11200' MD - PU 180 KLBS, SO 153 KLBS AT 11200' MD - MUD WEIGHT IN/OUT = 8.5 PPG - MONITOR DISPLACEMENT WITH TRIP TANK 14:30 - 15:30 1.00 PERFOB P 13,625.00 OTHCMP SPACE OUT PERFORATING GUNS AND PERFORATE WELL WITH HALLIBURTON 2-7/8" JRC VANN GUNS W/ MAXFIRE E -FIRE HEAD PER HALLIBURTON PROCEDURE -TAG NO-GO AT 11270'MD AND PICK UP 37' TO SPACE OUT GUNS AT 11231' MD - FOLLOW PRESSURE UP/BLEED OFF SEQUENCE TO FIRE WITH MAXFIRE HEAD - OBSERVE GOOD INDICATION OF GUNS FIRING AT SURFACE. -345 NET PERFS ACROSS 2INTERVALS - 10070' - 1010 3 2-7/8" JRC VANN GUN DESCRIPTIONS, GUN SWELL 3.047": - 6 SPF, 60' DEG PHASING, 2 7/8" MAXFORCE 17 GRAM CHARGES, 28.6" PENETRATION, 0.37" ENTRY HOLE DIAMETER 15:30 - 16:00 0.50 PERFOB P 13,625.00 OTHCMP PULLABOVE THE TOP OF THE 7" LINER TO 9890' MD - PU 178 KLBS, SO 150 KLBS - MUD WEIGHT IN/OUT = 8.5 PPG - MONITOR DISPLACEMENT WITH TRIP TANK; LOSS RATE OF 7-5 BPH 16:00 - 17:00 1.00 PERFOB P 13,625.00 OTHCMP CIRCULATE A BOTTOMS UPAT 10 BPM, 3330 PSI - 7 BPH DYNAMIC LOSS RATE *All depths reported in Drillers Depths- Common Well Name. 01-36 Event Type: COM- ONSHORE (CON) PBU North America - ALASKA - BP Page 5 of 8 Operation Summary Report Start Date: 7/1/2018 End Date: 7/6/2018 Site 01 AFE No X3-018YT-Q (2,722,188.00) Rig N8MWNO.: HARKEN 212 Spud Uate/Time: 6/15/2018 12*00:OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.701(above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations .. (hr) _ (usd) 17:00 - 19:30 2.50 PERF P 13625.00 OTHCMP PULLOUT OF THE HOLE ON ELEVATORS 19:30 - 2300 3.50 PERF P 2300 - 0000 1.00 PERFOB P 7/4/2018 00:00 - 01:00 1.00 RUNCOM 7 P 01:00 - 09'.00 8.00 RUNCOM P 09:00 - 09:30 0.50 RUNCOM P 0930 - 1000 0.50 RUNCOM P FROM 9890' MD TO 1400' MD - PU 178 KLBS, SO 150 KLBS AT 9890' MD - MUD WEIGHT IN/OUT = 8.5 PPG �- MONITOR DISPLACEMENT WITH TRIP TANK; LOSS RATE OF 3 BPH - MONITOR THE WELL FOR 10 MIN PRIOR TO 'PULLING NON-SHEARABLES ACROSS THE STACK 13,625.00 OTHCMP PULLAND LAY DOWN 2-7/8" PAC DRILL PIPE AND 2-7/8" PERFORATING GUNS FROM 1400' MD - MUD WEIGHT NiI= 8.5 PPG -MONITOR DISPLACEMENT WITH TRIP TANK, LOSS RATE OF 2 BPH ALLGUNS_FIRED _ 13,625.00 OTHCMP RIG DOWN PERFORATING GUN HANDLING EQUIPMENTAND CLEAN AND CLEAR RIG FLOOR - PULL WEAR BUSHING FLUSH BOP STACK MAINTAIN CONTINOUS HOLE FILL: STATIC LOSS RATE 1-2 BPH SEAWATER: 8.5 PPG IN/OUT SIMOPS: - RIG DOWN BAKER MWD EQUIPMENT FROM _ RIG FLOOR 13,625.00 RUNCMP RIG UP TO RUN 4-1/2", 12.611 VAMTOP COMPLETION PER APPROVED TUBING TALLY - VERIFY PIPE COUNTAND JEWELRY LAYOUT IN PIPE SHED - RIG UP DOYON CASING TONGS AND _ TORQUE TURN EQUIPMENT 13,625.00 RUNCMP RUN 4-1/2", 12.0, 13CR, VAMTOP COMPLETION TUBING TO 5623' MD - BAKERLOKALL CONNECTIONS BELOW THE PACKER - APPLY JET LUBE SEAL GUARD OR BEST -O -LIFE 4010 TO PREMIUM VAMTOP THREADS (PIPE DELIVERED TO RIG WITH TWO DIFFERENT PIPE DOPES) - TORUE TURN VAMTOP CONNECTIONS TO OPT MU TRQ OF 4440 FT -LBS. VAM REP ON LOCATION TO INSPECT THREADS AND WITNESS MAKEUP - RUNNING SPEED = 90 FPM, AVERAGE 22 JOINTS PER HOUR - SEAWATER: 8.5 PPG IN/OUT (CONTINUOUS CIRCULATION OVER TOP): - 1-2 BPH LOSS RATE WHILE RUNNING IN THE HOLE SIMOPS: - LAYDOWN 4" DRILLPIPE WITH OFFLINE EQUIPMENT 13,625.00 RUNCMP FIRE DRILLAND AAR WITH FULL RIG CREW AND THIRD PARTIES INVOLVED, 13,625.00 RUNCMP SERVICE PIPE CAT AND PIPE HANDLING EQUIPMENT Printed 7/31/2018 9:01:57AM *All depths reported in Drillers Depths' North America - ALASKA- EP Operation Summary Report Page 6 of 8 Common Well Name: 01-36 AFE No Event Type: COM- ONSHORE (CON) Start Date'. 7/1/2018 End Date: 7/6/2018 X3-018YT-C'. (2,722,188.00) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Date/Time: 6/15/2018 12:00 OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @68.70usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (ho- _(usft) 10:00 - 17:30 7.50 RUNCOM P 13,625.00 RUNCMP CONTINUE TO RUN 4.112",12.6#, 13CR, 17:30 - 18:30 VAMTOP COMPLETION TUBING FROM 5623' MD TO 9898' MD. SPACEOUTAND LAND TUBING HANGER. - BAKERLOKALL CONNECTIONS BELOW THE PACKER - APPLY JET LUBE SEAL GUARD OR BEST -0 -LIFE 4010 TO PREMIUM VAMTOP THREADS (PIPE DELIVERED TO RIG WITH TWO DIFFERENT PIPE DOPES) TORQUE TURN VAMTOP CONNECTIONS TO OPT MU TRQ OF 4440 FT -LBS. VAM REP ON LOCATION TO INSPECT THREADS AND WITNESS MAKEUP - RUNNING SPEED = 90 FPM, AVERAGE 22 JOINTS PER HOUR - SEAWATER: 8.5 PPG IN/OUT (CONTINUOUS CIRCULATION OVER TOP) -TOTAL LOSSES WHILE RUNNING IN THE HOLE: 18 BELS '- 1-2 BPH LOSS RATE WHILE RUNNING IN THE HOLE li -FINAL PICKUP/SLACKOFF WEIGHTS= 149/118 KLBS (P272 TOP DRIVE + BLOCKS = 35 KLBS) -SEE ATTACHED EXCEL TALLY - FMC REPRESENTATIVE TORQUE GLAND NUTS AND LOCK DOWN SCREWS I SPACEOUT NOTES: - TAG BASE OF LINER PBR AT 31' IN ON JOINT #227 - LAYDOWN JOINTS 227, 226, AND 225 - PICKUP SPACEOUT PUPS 19.40' AND 3.70', JOINT 225 AND HANGER. - RUN IN HOLEAND LAND HANGER WITH WLEG AT 9898' MD (T INTO LINER TOP PBR, 4' OFF LINER TOP NO-GO) SIMOPS: - LAYDOWN 4" DRILLPIPE WITH OFFLINE EQUIPMENT - HELD RIG MOVE PLANNING MEETING WITH TOOL SERVICE AND N.S. SUPERINTENDENT 1.00 RUNCOM P 13,625.00 RUNCMP REVERSE IN COMPLETION FLUIDS - 4 BPM, 550 PSI -PUMP 110 BELS CORROSION INHIBITED SEAWATER - CHASE WITH 75 BBLS CLEAN SEAWATER - PUMP 5 BELS THE LONG WAY TO FLUSH RHC -M PLUG SIMOPS: - RIG DOWN 4-1/2" COMPLETION RUNNING TOOLS Printed 7/312018 9:01 57AM 'All depths reported in Drillers Depths' Common Weil Name: Ot-36 Event Type: COM -ONSHORE (CON) PBU North America - ALASKA - BP Page 7 of 6 Operation Summary Report Start Date: 7112018 Site: 01 Active datum: 01-36 ACTUAL Det @88.70usft (above Mean Sea Level) Date From - To His Task Code _ _(hr) 1830 - 21:30 3.00 RUNCOM P 21:30 - 2330 2.00 RUNCOM P 23:30 - 00:00 0.50 WHSUR P AFE No End Date: 7/6/2018 X3-018YT-C (2,722,188.00 ) SPUOI: USA00006193 NPT Total Depth Phase Description of Operations (usft) 13,625.00 RUNCMP DROP BALL AND ROD AND ALLOW TO LAND ON SEAT ON RHC -M PLUG. PRESSURE UP AND SET HALLIBURTON'TNT' PRODUCTION PACKER PER HALLIBURTON REPRESENTATIVE AND PRESSURE TEST TUBING AND IA TO 3500 PCI FOR 3n CHARTED MIN EACH. BOTH TESTS PASS PER BP PRACTICE 100218 CRITERIA 3B 3500 PSI 4-12° TUBING TEST: PRESSURE CROSSCHECK COMPLETED - TEST WITH 8.5 PPG SEAWATER, 100-F - PRODUCTION PACKER SET DURING PRESSURE UP - STARTING PRESSURE = 3800 PSI .- PRESSUREAFTER 15 MIN = 3750 PSI - PRESSUREAT 30 MIN = 3740 PSI -BBLS TO PRESSURE UP=2.5 BBLS - BBLS BLED BACK= 2.5 BBLS - DS01 AMBIENT TEMP = 43°F 3500 PSI INNER ANNULUS AND PRODUCTION PACKER TEST: -PRESSURE CROSSCHECK COMPLETED - TEST WITH 6.5 PPG SEAWATER, 100°F 2000 PSI HELD ON TUBING DURING TEST (TO PREVENT SHEAR OF UPPER GLM) - STARTING PRESSURE = 3780 PSI - PRESSURE AFTER 15 MIN = 3740 PSI - PRESSURE AT 30 MIN = 3740 PSI -BBLS TO PRESSURE UP=2.5 BBLS - BBLS BLED BACK = 2.5 BBLS - DS01 AMBIENT TEMP = 43°F PRESSURE TESTS VERBALLY APPROVED BY ACTING WSUP SEE ATTACHED TEST CHART AND TEST CRITERIA CALCULATORS BLEED OFF TUBING QUICKLY TO SHEAR DCK VALVE IN UPPER GLM VERIFY CIRCULATION BOTH WAYS AT 2 BPM: 4001600 PSI 13,625.00 RUNCMP FREEZE PROTECT TUBING AND IA WITH 90°F 6.8 PPG DIESELTO 2200' MD/TVD - REVERSE 75 BBLS INTO IA WITH FREEZE PROTECT PUMP; 2 BPM, 500 PSI ICP, 800 PSI FCP - U -TUBE DIESEL FROM IA TO TUBING FOR ONE HOUR. CONFIRM NO FLOW, NO PRESSURE AT END OF U -TUBE - TOTAL DIESEL IN TUBING = 34 BBLS, TOTAL IN IA=41 BBLS SIMOPS: - REMOVE KELLY HOSE AND LAY DOWN TO PIPE SHED 13,625.00 RUNCMP FMC REPRESENTATIVE SET 4" TYPE HTWC IN TUBING HANGER WITH DRY ROD. Printed 7(312018 9'.01.57AM *All depths reported in Dnllers Depths' North America - ALASKA - BP Operation Summary Report Page 8 of e Common Well Name. 01-36 AFE No Event Type: COM- ONSHORE (CON) Start Date: 7/1/2018 End Date: 7/6/2018 X3-018YT-C'. (2,722,188.00 ) Project: PBU Site: 01 Rig Name/No.: PARKER 272 Spud Daterrime: 6/15/2018 12:00:OOPM Rig Release: 7/6/2018 Rig Contractor: PARKER DRILLING CO. BPUOI: USA00006193 Active datum: 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 7/5/2018 00:00 - 02:00 2.00 WHSUR P 13,625.00 RUNCMP RIG UP AND PRESSURE TEST TWC FROM ABOVE AND BELOW TO 3500 PSI FOR 5 CHARTED MIN EACH WITH DIESEL: GOOD TESTS SEE ATTACHED TEST CHART 02:00 - 22:00 20.00 RIGD P 13,625.00 RUNCMP RIG DOWN AND PREP TO NIPPLE DOWN BOP STACK i - LAY DOWN STANDS OF 4" DRILL PIPE - CLEAN OUT DRIP PANS -SUCK OUT STACK -4 -BOLT FLANGES ON HIGH PRESSURE RISERS AND STACK - PULLAND LAY DOWN MOUSEHOLE - PULLAND LAY DOWN PITCHER NIPPLEAND LOW PRESSURE RISERS SIMOPS: '- GENERAL RIG DOWN OPERATIONS - CLEAN PITS - RIG DOWN INTERCONNECTS - REMOVE PIPE HANDLING EQUIPMENT FROM RIG FLOOR 22:00 - 23:00 1.00 BOPSUR P 13,625.00 RUNCMP _ NIPPLE DOWN BOPEAND HIGH PRESSURE RISERS - LAY DOWN RISERS TO PIPE SHED AND SET BOP STACK BACK ON STUMP IN BOP DECK 23:00 - 00:00 1.00 WHSUR P 13,625.00 RUNCMP NIPPLE UP 11"XB' TUBING HEAD ADAPTER _ _ AND DOUBLE MASTER 4" DRY HOLE TREE 7/6/2016 00:00 - 01:30 1.50 WHSUR P 13,625.00 RUNCMP NIPPLE UP 11"X 4" TUBING HEAD ADAPTER AND DOUBLE MASTER 4" DRY HOLE TREE 01:30 - 03:30 2.00 WHSUR P 13,625.00 RUNCMP PRESSURE TEST ADAPTER AND TREE - FMC REPRESENTATIVE TEST TUBING HEAD ADAPTER (TUBING PACK -OFF) TO 4500 PSI FOR 15 MIN - N.S. SUPERINTENDENT(WSUP DOA) APPROVED TEST - PRESSURE TEST TREE WITH DIESEL 4500 PSI LEAK -TIGHT: GOOD TEST SIMOPS: GENERAL RIG DOWN OPERATIONS 0330 - 0600 2.50 WHSUR P 13,625.00 RUNCMP CLEAN AND CLEAR WELLHEAD AND CELLAR SIMOPS: - PREP RIG FOR MOVE TO PRICE PAD - REMOVE BLOCKS FROM TOP DRIVE AND INSTALL SHIPPING PLATE ON WASH PIPE - INSTALL BRIDLE LINES AND RAISE BLOCKS TO DERRICK OVER POSITION - PERFORM PRE -DERRICK OVER INSPECTION - RAISE FAST LINE HATCH AND REMOVE TORQUE TUBE PIN. RELEASE FROM 01-36 AT 06:00 Printed 7/3112015 9:01 57AM 'All depths reported in Drillers Depths' by North America - ALASKA - BP PBU 01 01-36 01-36 500292360300 Design: 01-36 Final Survey Report 13 July, 2018 BAIGIHES T 1 a GE company by 5,941,932.140 usft BP Final Survey Report BAKER rjUGHES Slot Radius: 0.000 in Northing: GEc mpany Company: North America - ALASKA -BP Local Co-ordinate Reference: Well 01-36 Project: PBU TVD Reference: 01-36 ACTUAL Def @ 88.70usft (P272 Actual) Site: 01 MD Reference: 01-36 ACTUAL Def @ 88.70usft (P272 Actual) Well: 01-36 North Reference: True Wellbore: 01-36 Survey Calculation Method: Minimum Curvature Design: 01-36 Database: EDM R5K - Alaska PROD - ANCPI Project PBU, PBU, PRUDHOE Map System: Alaska NA027 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK [4267'15864] Using Well Reference Point Map Zone: NAD27 `OGP-Usa AK / Alaska zone 4 [26734'1586, Using geodetic scale factor Site 01, TR -10-15 Site Position: From: Map Position Uncertainty: 0.00 usft Well 01-36, 01-36 Well Position +N/ -S 0.00 usft .E/ -W 0.00 usft Position Uncertainty 0.00 usft Wellbore 01-36 Magnetics Model Name Sample Date Design Audit Notes: Version: Vertical Section: BGGM2017 7/1/2018 01-36 Phase: Depth From (TVD) (usft) 40.00 Northing: 5,941,932.140 usft Easting: 697,237.600 usft Slot Radius: 0.000 in Northing: 5,940,291.130 usft Easting: 698,768.120 usft Wellhead Elevation: 45.10 usft Latitude: 70' 14'43,905 N Longitude: 148° 24'24.004 W Grid Convergence: 1.50 ° Declination Dip Angle Field Strength (nT) 17.33 80.95 57464 Tie On Depth: 40.00 NI -S +EI -W Direction usft) (usft) (I )00 000 125.19 i Latitude: 70° 14'27375 N Longitude: 148° 23'40.774 W Ground Level: 40.00 usft 7/13/2018 3:00:12PM Paye COMPASS 5000.1 Budd81D b BP BAKER p Final Survey Report �jUGHES GEcompam Company: Norm America - ALASKA - BP Local Coordinate Reference: Well 01-36 Project: PBU TVD Reference: 01-36 ACTUAL Def @ 88.70usft (P272 Actual) Site: 01 MD Reference: 01-36 ACTUAL Def @ 88.70usft (P272 Actual) Well. 01-36 North Reference: True Wellbore: 01-36 Survey Calculation Method: Minimum Curvature Design: 01-36 Database: EDM R5K - Alaska PROD - ANCP1 Survey Program Date 7/13/2018 From To (usft) (usft) Survey (Wellbore) Tool Name Description 1 80.94 454.03 1 -Gyro SS 13-1/2" (01-36) GYD-CT-DMS Gyrodata cont.drillpipe mls 492.54 861.14 2_OTK MWD I3-1/2"(01-36) MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal 916.20 916.20 3_GynoSS 13-1/2" (01-36) GYD-CT-DMS Gyrodata cont.drillpipe mls 998.28 3,787.784_OTK MWD I3-1/2"(01-36) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 3,862.08 10,031.425_ATK MWD 9.7/8"(01-36) MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal 10,101.03 13,625.006_ATK MWD 6-1/B"(01-36) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal Survey MD Inc AN (azimuth) TVD TVDSS N/S FJW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 40.00 0.00 0.00 40.00 -48.70 0.00 0.00 5,940,291.130 698,768.120 0.00 0.00 80.94 0.03 238.13 80.94 -7.76 .0.01 -0.01 5,940,291.124 698,768.111 0.07 0.00 128.00 0.07 236.79 128.00 39.30 -0.03 -0.04 5,940,291.100 698,768.076 0.09 -0.02 20" 178.05 0.12 236.44 178.05 89.35 -0.08 -0.12 5,940,291.052 698,768.007 0.09 -0.05 267.78 0.49 150.41 267.78 179.08 -0.46 0.00 5,940,290.089 698,768.128 0.55 0.26 360.09 1,47 136.83 360.07 271.37 -1.67 1.00 5,940,269.489 698,769.164 1.08 1.78 454.03 2.68 135.05 453.95 365.25 -4.10 3.38 5,940,287.120 698,771.604 1.29 5.12 492.54 3.41 132.27 492.41 403.71 -5.51 4.86 5,940,285.752 698,773.124 1.93 7.15 584.64 5.06 131.56 584.25 495.55 -10.05 9.93 5,940,281.350 698,778.308 1.79 13.90 677.17 7.11 135.03 676.26 587.56 -16.80 17.03 5,940,274.781 698,785.584 2.25 23.60 771.02 9.62 138.66 769.10 680.40 -26.80 26.31 5,940,265.031 698,795.130 2.73 36.95 861.14 11.74 139.34 857.65 768.95 -39.41 37.26 5,940,252.715 698,806.407 2.36 53.17 916.20 12.27 139.16 911.51 822.81 -46.09 44.74 5,940,244.240 698,814.109 0.96 64.28 998.28 13.34 138.73 991.55 902.85 -61.80 56.69 5,940,230.845 698,826.415 1.31 81.95 1,051.24 13.98 138.29 1,043.01 954.31 -71.17 64.98 5,940,221.699 696,834.945 1.22 94.12 1,145.70 14.87 138.03 1,134.53 1,045.83 -88.58 80.57 5,940,204.706 698,850.989 0.73 116.89 1,240.00 16.50 137.11 1,225.36 1,136.66 -107.27 97.67 5,940,186.474 698,868.576 1.96 141.64 1,334.79 17.20 135.53 1,318.08 1,227.38 -127.14 116.65 5,940,167.118 698,888.072 0.88 168.60 7/132018 3:00:12PM Page 3 COMPASS 5000.1 Build 81D BP BAER by Final Survey Report YES (PE company Company: North Amenca- ALASKA - BP Local Coordinate Reference: Well 01-36 Project. PBU TVD Reference: 01-36 ACTUAL Def @ 88.70usft (P272 Actual) Site: 01 MD Reference: 01-36 ACTUAL Det @ 88.70usft (P272 Actual) Well: 01-36 North Reference: True Wellbore: 01-36 Survey Calculation Method: Minimum Curvature Design: 01-36 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Aid (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (') (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 142940 18.45 136.76 1,406.15 1,317.45 -148.03 136.70 5,940,148766 698,908.671 1.38 197.03 1,524.30 19.86 138.05 1,495.79 1,407.09 -170.96 157.77 5,940,124.401 698,930.331 1.55 227.46 1,619.00 21.75 139.17 1,584.31 1,495.61 -196.20 179.99 5,940,099.755 698,953.215 2.04 260.17 1,713.41 22.32 139.77 1,671.83 1,583.13 -223.12 203.01 5,940,073.450 698,976.931 0.65 294.49 1,808.40 22.42 140.59 1,759.67 1,670.97 -250.89 226.16 5,940,046.305 699,000.803 0.34 329.41 1,902.67 22.50 141.28 1,846.79 1,758.09 -278.85 248.86 5,940,018.952 699,024.227 0.29 364.08 1,997.24 23.37 141.43 1,933.88 1,845.18 -307.63 271.87 5,939,990.787 699,047.990 0.92 399.47 2,091.94 25.18 140.64 2,020.20 1,931.50 -337.90 296.36 5,939,961.181 699,073.267 1.94 436.92 2,185.07 28.38 138.04 2,103.34 2,014.64 -369.68 323.73 5,939,930.130 699,101.465 3.66 477.61 2,281.45 30.39 138.28 2,187.31 2,098.81 404.92 355.27 5,939,895.743 699,133.923 2.09 523.69 2,376.91 32.92 138.39 2,268.56 2,179.86 442.34 388.57 5,939,859.213 699,168.196 2.65 572.47 2,471.00 34.53 136.93 2,346.82 2,258.12 480.94 423.76 5,939,821.556 699,204.391 1.92 623.48 2,566.59 35.48 135.57 2,425.12 2,336.42 -520.54 461.68 5,939,782.989 699,243.342 1.29 677.29 2,660.70 36.74 135.69 2,501.15 2,412.45 -560.19 500.47 5,939,744.361 699,283.155 1.34 731.84 2,755.90 36.56 136.47 2,577.53 2,488.83 -601.12 539.88 5,939,704.485 699,323.636 0.52 787.64 2,850.79 36.08 136.64 2,653.98 2,565.28 -641.93 578.53 5,939,664.715 699,363.345 0.52 842.74 2,945.70 35.90 136.93 2,730.77 2,642.07 -682.57 616.72 5,939,625.092 699,402.592 0.26 897.37 3,039.25 36.12 137.14 2,806.45 2,717.75 -722.82 654.21 5,939,585.849 699,441.123 0.27 951.20 3,135.12 35.82 137.49 2,884.04 2,795.34 -764.21 692.39 5,939,545.479 699,480.376 0.38 1,006.26 3,229.60 35.20 137.72 2,960.95 2,872.25 -804.74 729.39 5,939,505.944 699,518.431 0.67 1,059.85 3,324.30 34.64 139.53 3,038.60 2,949.90 -845.41 765.22 5,939,466.234 699,555.321 1.24 1,112.57 3,418.62 34.66 140.06 3,116.35 3,027.65 -886.46 799.91 5,939,426.122 699,591.080 0.32 1,164.58 3,513.14 34.49 137.97 3,194.02 3,105.32 -926.86 835.01 5,939,386.662 699,627.230 1.27 1,216.54 3,607.95 34.95 136.17 3,271.95 3,183.25 -966.39 871.79 5,939,348.117 699,665.037 1.19 1,269.38 3,703.22 34.32 136.64 3,350.33 3,261.63 -1,005.60 909.13 5,939,309.904 699,703.394 0.72 1,322.50 3,767.78 33.58 136.80 3,420.48 3,331.78 -1,039.98 941.50 5,939,276.393 699,736.662 0.68 1,368.77 7/13/2018 3.00:12PM Page 4 COMPASS 5000.1 Build 81D b BP BAKER P Final Survey Report UGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well 01-36 Project: PBU TVD Reference: 01-36 ACTUAL Def @ 88.70usft (P272 Actual) Site: 01 MD Reference: 01-36 ACTUAL Def @ 88.70usft (P272 Actual) Well: 01-36 North Reference: True Wellbore: 01-36 Survey Calculation Method: Minimum Curvature Design: 01-36 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc AN (azimuth) TVD TVDSS N/S E/W Northing Eating DLeg V. Sec (usft) P) C) (usft) (usft) (usft) (usft) (usft) (usft) ('/100usft) (usft) 3,840.00 33.28 137.16 3,464.06 3,375.36 -1,061.01 961.13 5,939,255.885 699,756.839 0.68 1,396.9' 10 314" 3,862.08 33.16 137.31 3,482.53 3,393.63 -1,069.89 969.35 5,939,247.224 699,765.284 0.68 1,406.76 3,892.92 32.27 137.05 3,508.48 3,419.78 -1,082.12 980.67 5,939,235.302 699,776.930 2.92 1,425.07 3,987.52 31.93 137.35 3,588.61 3,499.91 -1,119.00 1,014.83 5,939,199.333 699,812.045 0.40 1,474.24 4,061.20 31.79 138.01 3,668.18 3,579.46 -1,155.57 1,048.12 5,939,163.664 699,846.288 0.40 1,522.51 4,176.50 31.98 138.03 3,749.10 3,660.40 -1,193.28 1,081.46 5,939,126.845 699,880.609 0.60 1,571.50 4,271.22 31.41 138.81 3,829.69 3,740.99 -1,230.79 1,114.16 5,939,090.209 699,914.286 0.61 1,619.84 4,366.00 3146 138.10 3,910.56 3,821.86 -1,267.79 1,146.95 5,939,054.094 699,948.031 0.39 1,667.95 4,460.13 31.36 138.03 3,990.90 3,902.20 -1,304.28 1,179.73 5,939,018.479 699,981.763 0.11 1,715.77 4,555.19 31.56 137.40 4,071.99 3,983.29 -1,340.98 1,213.11 5,938,982.672 700,016.098 0.40 1,764.20 4,649.64 31.50 137.70 4,152.49 4,063.79 -1,377.43 1,246.45 5,938,947.121 700,050.382 0.18 1,81245 4,743.79 31.51 134.68 4,232.77 4,144.07 -1,412.92 1,280.50 5,938,912.538 700,085.355 1.68 1,860.73 4,837.99 31.42 134.47 4,313.12 4,224.42 -1,447.43 1,315.52 5,938,878.966 700,121.276 0.15 1,909.25 4,932.51 31.47 136.07 4,393.76 4,305.06 -1,482.46 1,350.22 5,938,844.866 700,156.884 0.88 1,957.79 5,027.43 31.27 136.04 4,474.80 4,386.10 -1,518.04 1,384.51 5,938,810.208 700,192.099 0.21 2,006.32 5,122.65 31.32 137.50 4,556.17 4,467.47 -1,554.07 1,418.39 5,938,775.080 700,226.910 0.80 2,054.77., 5,217.04 31.29 137.51 4,636.82 4,548.12 -1,590.24 1,451.52 5,938,739.805 700,260.981 0.03 2,102.68 5,311.75 31.21 137.80 4,717.79 4,629.09 -1,626.55 1,484.61 5,938,704.378 700,295.021 0.18 2,150.66 5,406.25 31.27 138.85 4,798.59 4,709.89 -1,663.16 1,517.20 5,938,668.848 700,328.558 0.58 2,198.38 5,500.89 31.34 138.37 4,879.45 4,790.75 -1,700.05 1,549.71 5,938,632.627 700,362.031 0.27 2,246.22 5,594.94 31.29 138.10 4,959.80 4,871.10 -1,736.51 1,582.27 5,938,597.040 700,395.538 0.16 2,293.84 5,689.52 31.25 138.06 5,040.64 4,951.94 -1,773.04 1,615.07 5,938,561.390 700,429.287 0.05 2,341.69 5,784.82 31.23 137.67 5,122.12 5,033.42 -1,809.69 1,648.23 5,938,525.627 700,463.398 0.21 2,389.91 5,879.39 31.27 137.88 5,202.97 5,114.27 -1,846.02 1,681.20 5,938,490.181 700,497.313 0.12 2,437.79 5,973.66 31.29 137.29 5,283.54 5,194.84 -1,882.15 1,714.21 5,938,454.930 700,531.267 0.33 2,485.60 6,068.03 31.33 137.70 5,364.16 5,275.46 -1,918.31 1,747.35 5,938,419.665 700,565.342 0.23 2,533.51 7/13/2018 3:00.12PM Page 5 COMPASS 5000.1 Build 810 b BP BER P Final Survey Report �jUGHEB aGEcompany Company: North America - ALASKA - BP Local Coordinate Reference: Well 01-36 Project: PBU TVD Reference: 01-36 ACTUAL Def @ 88.70usft (P272 Actual) Site: 01 MD Reference: 01-36 ACTUAL Def @ 88.70usft (P272 Actual) Well: 01-36 North Reference: True Wellbore: 01-36 Survey Calculation Method: Minimum Curvature Design: 01-36 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. a" (usft) (°) (°) (usft) (usft) (usft) (craft) (usft) (usft) (°I100craft) (craft) 6,163.18 31.45 137.57 5,445.39 5,356.69 -1,954.93 1,780.74 5,938,383.942 700,599.690 0.14 2,581.91 6,258.40 31.26 139.16 5,526.70 5,438.00 -1,991.95 1,813.66 5,938,347.798 700,633.569 0.89 2,630.15 6,353.05 31.19 139.78 5,607.64 5,518.94 -2,029.25 1,845.55 5,938,311.360 700,666.425 0.35 2,677.70 6,448.80 31.27 139.71 5,689.52 5,600.82 -2,067.13 1,877.63 5,938,274.334 700,699.491 0.09 2,725.75 6,543.83 31.28 138.89 5,770.74 5,682.04 -2,104.53 1,909.80 5,938,237.796 700,732.634 0.45 2,773.59 6,638.38 31.26 139.10 5,851.55 5,762.85 -2,141.57 1,942.00 5,938,201.623 700,765.799 0.12 2,821.25 6,733.19 31.33 139.50 5,932.57 5,843.87 -2,178.91 1,974.11 5,938,165.148 700,798.885 0.23 2,869.02 6,827.53 31.29 139.55 6,013.17 5,924.47 -2,216.20 2,005.94 5,938,128.709 700,831.679 0.05 2,916.52 6,922.69 31.31 137.98 6,094.48 6,005.78 -2,253.38 2,038.52 5,938,092.409 700,865.230 0.86 2,964.57 7,017.54 31.28 136.47 6,175.53 6,086.83 -2,289.54 2,071.98 5,938,057.143 700,899.627 0.83 3,012.75 7,111.92 31.22 136.66 6,256.22 6,167.52 -2,325.09 2,105.64 5,938,022.491 700,934.214 0.22 3,060.75 7,207.16 31.32 136.82 6,337.64 6,248.94 -2,361.10 2,139.53 5,937,987.389 700,969.038 0.14 3,109.20 7,301.77 31.32 137.16 6,418.45 6,329.75 -2,397.06 2,173.07 5,937,952.333 701,003.510 0.19 3,157.33 7,396.72 31.27 137.60 6,499.58 6,410.88 -2,433.35 2,206.46 5,937,916.935 701,037.851 0.25 3,205.54 7,491.75 31.33 137.19 6,580.78 6,492.08 -2,469.69 2,239.88 5,937,081493 701,072.216 0.23 3,253.79 7,585.97 31.34 138.03 6,661.26 6,572.56 -2,505.88 2,272.92 5,937,846.191 701,106.189 0.46 3,301.64 7,680.78 31.29 139.16 6,742.26 6,653.56 -2,542.83 2,305.51 5,937,810.106 701,139.740 0.62 3,349.57 7,775.23 31.38 138.85 6,822.93 6,734.23 -2,579.91 2,337.73 5,937,773.898 701,172.925 0.20 3,397.27 7,869.98 31.32 138.09 6,903.85 6,815.15 -2,616.81 2,370.41 5,937,737.873 701,206.568 0.42 3,445.25 7,964.83 31.28 137.27 6,984.89 6,896.19 -2,653.24 2,403.58 5,937,702.328 701,240.690 0.45 3,493.35 8,058.82 31.31 136.49 7,065.21 6,976.51 -2,688.88 2,436.96 5,937,667.586 701,274.987 0.43 3,541.16 8,153.83 31.16 135.80 7,146.45 7,057.75 -2,724.40 2,471.09 5,937,632.974 701,310.044 CAI 3,589.53 8,248.76 31.26 135.59 7,227.64 7,138.94 -2,759.61 2,505.45 5,937,598.692 701,345.316 0.16 3,637.90 8,343.92 31.29 136.19 7,308.97 7,220.27 -2,795.08 2,539.83 5,937,564.142 701,380.623 0.33 3,686.44 8,437.75 31.28 136.51 7,389.16 7,300.46 -2,830.33 2,573.46 5,937,529.787 701,415.172 0.18 3,734.24 8,532.44 31.17 136.76 7,470.13 7,381.43 -2,866.02 2,607.17 5,937,495.004 701,449.805 0.18 3,782.36 8,627.13 31.35 137.51 7,551.07 7,462.37 -2,902.03 2,640.60 5,937,459.885 701,484.166 0.45 3,830.43 7/13/2018 3:00:12PM Page 6 COMPASS 5000.1 Build BID by BP BAKER Final Survey Report JUGHES n,ua�v Company: North Amenca- ALASKA - BP Local Coordinate Reference: Well 01-36 Project: PBU TVD Reference: 01-36 ACTUAL Det @ 88.70usft (P272 Actual) Site: 01 MD Reference: 01-36 ACTUAL Def @ 88.70usft (P272 Actual) Well: 01-36 North Reference: True Wellbore: 01-36 Survey Calculation Method: Minimum Curvature Design: 01-36 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc AN(azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (ua ft) (°N80usft) (usft) _ 8,722.01 31.71 136.40 7,631.95 7,543.25 -2,938.29 2,674.46 5,937,424.535 701,518.976 0.72 3,879.00 8,816.87 33.99 134.60 7,711.63 7,622.93 -2,974.97 2,710.54 5,937,388.823 701,556.006 2.61 3,929.62 8,911.36 36.82 132.23 7,788.65 7,699.95 -3,012.56 2,750.32 5,937,352.302 701,596.762 3.33 3,983.79 9,006.56 39.01 132.08 7,863.75 7,775.05 -3,051.81 2,793.69 5,937,314.204 701,641.146 2.30 4,041.86 9,101.83 39.38 131.84 7,937.58 7,848.88 -3,092.07 2,838.46 5,937,275.146 701,686.960 042 4,101.64 9,196.31 39.53 130.30 8,010.53 7,921.83 -3,131.51 2,883.72 5,937,236.914 701,733.244 1.05 4,161.36 9,291.31 39.55 129.78 8,083.80 7,995.10 -3,170.42 2,930.02 5,937,199.243 701,780.553 0.35 4,221.63 9,386.24 39.87 130.87 8,156.83 8,068.13 -3,209.66 2,976.26 5,937,161.229 701,827.806 0.81 4,282.03 9,480.83 39.45 131.64 8,229.65 8,140.95 -3,249.47 3,021.65 5,937,122.635 701,874.223 0.68 4,342.06 9,575.67 40.07 131.10 8,302.55 8,213.85 -3,289.56 3,067.17 5,937,083.764 701,920.782 0.75 4,402.37 9,670.55 39.54 130.72 8,375.44 8,286.74 -3,329.34 3,113.07 5,937,045.213 701,967.715 0.61 4,462.80 9,765.24 40.24 131.07 8,448.09 8,359.39 -3,369.09 3,158.97 5,937,006.883 702,014.647 0.78 4,523.23 9,859.73 40.22 131.55 8,520.23 8,431.53 -3,409.38 3,204.81 5,938,967.622 702,061.531 0.33 4,583.91 9,954.15 39.78 131.97 8,592.56 8,503.86 -3,449.80 3,250.08 5,936,928.411 702,107.852 0.55 4,644.20 10,031.42 40.28 132.75 8,651.73 8,563.03 -3,483.29 3,286.81 5,936,895.906 702,145.442 0.92 4,693.51 10,061.00 41.51 131.77 8,674.09 8,585.39 -3,496.31 3,301.14 5,936,883.268 702,160.112 4.68 4,712.7: 7" 10,101.03 43.18 130.52 8,703.68 8,614.98 -3,514.04 3,321.45 5,936,866.074 702,180.877 4.68 4,739.54 10,134.06 47.76 129.49 8,726.83 8,638.13 -3,529.17 3,339.48 5,936,851.430 702,199.305 14.04 4,763.00 10,166.75 52.30 128.57 8,747.83 8,659.13 -3,544.94 3,358.94 5,936,836.182 702,219.173 14.05 4,78799 10,194.11 55.97 128.65 8,763.86 8,675.16 -3,558.77 3,376.26 5,936,822.811 702,236.854 13.42 4,810.12 10,227.83 61.09 128.73 8,781.45 8,692.75 -3,576.74 3,398.71 5,936,805.437 702,259.759 15.19 4,838.82 10,258.99 65.46 130.27 8,795.46 8,706.76 -3,594.45 3,420.17 5,936,788.307 702,281.682 14.70 4,865.56 10,289.42 70.22 131.16 8,806.94 8,718.24 -3,612.83 3,441.52 5,936,770.496 702,303.510 15.88 4,894.60 10,322.15 75.01 129.60 8,816.72 8,728.02 -3,633.05 3,465.31 5,936,750.907 702,327.823 15.32 4,925.70 7/1312018 3:00: 12PM Page 7 COMPASS 5000.1 Build 81D BP bp Final Survey Report B FUGHES GE company Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 01-36 Project: PBU TVD Reference: 01-36 ACTUAL Det @ 88.70usft (P272 Actual) Site: 01 MD Reference: 01-36 ACTUAL Def @ 88.70usft (P272 Actual) Well: 01-36 North Reference: True Wellbore: 01-36 Survey Calculation Method: Minimum Curvature Design: 01-36 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc AN (azimuth) TVD TVDSB NIS EfW Northing Easting 111.99 V. Sac (usft) (1 0 (usft) (usft) (usft) (list" (usft) (usft) (110ousft) (usft) 10,354.34 80.81 129.74 8,823.45 8,734.75 -3,653.14 3,469.53 5,936,731.469 702,352.561 18.02 4,957.07 10,384.34 84.34 128.75 8,827.33 8,738.63 -3,671.95 3,512.56 5,936,713.268 702,376.083 12.21 4,986.74 10,416.81 89.47 127.74 8,829.08 8,740.38 -3,692.01 3,538.02 5,936,693.884 702,402.057 16.10 5,019.10 10,448.03 93.72 127.75 8,828.21 8,739.51 -3,711.11 3,562.69 5,936,675.443 702,427.222 13.61 5,050.27 10,479.25 98.62 127.62 8,824.86 8,736.16 -3,730.08 3,587.25 5,936,657.129 702,452.269 15.70 5,081.27 10,511.18 102.50 128.00 8,819.01 8,730.31 -3,749.32 3,612.04 5,936,638.551 702,477.561 12.21 5,112.62 10,542.85 106.79 126.59 8,811.00 8,722.30 -3,767.89 3,636.41 5,936,620.637 702,502.407 14.21 5,143.23 10,573.50 108.35 126.41 8,801.75 8,713.05 -3,785.27 3,659.90 5,936,603.883 702,526.344 5.12 5,172.45 10,611.11 109.61 125.91 8,789.52 8,700.82 -3,806.25 3,688.61 5,936,583.664 702,555.599 3.58 5,208.00 10,64142 109.70 125.96 8,779.33 8,690.63 -3,823.00 3,711.72 5,936,567.528 702,579.143 0.34 5,236.55 10,717.74 109.99 124.97 8,753.42 8,664.72 -3,864.65 3,770.19 5,936,527.435 702,638.685 1.28 5,308.33 10,750.05 108.49 123.11 8,742.77 8,654.07 -3,881.73 3,795.47 5,936,511.036 702,664.403 7.15 5,338.83 10,781.60 106.47 121.46 8,733.29 8,644.69 -3,897.80 3,820.91 5,936,495.643 702,690.256 8.12 5,368.88 10,613.24 104.63 120.90 8,724.81 8,636.11 -3,913.58 3,848.98 5,936,480,557 702,716.739 6.06 5,399.29 10,844.31 101.38 120.01 8,717.82 8,629.12 -3,928.92 3,873.08 5,936,465.910 702,743.226 10.83 5,429.45 10,875.70 98.01 119.28 8,712.53 8,623.83 -3,944.22 3,899.97 5,936,451.324 702,770.507 10.98 5,460.24 10,906.11 95.17 118.85 8,709.04 8,620.34 -3,958.89 3,926.37 5,936,437.352 702,797.286 9.44 5,490.28 10,938.69 92.89 120.03 8,706.75 8,618.05 -3,974.87 3,954.67 5,936,422.132 702,825.995 7.88 5,522.61 10,988.92 90.77 121.12 8,705.76 8,617.06 -3,990.74 3,981.54 5,936,406.970 702,853.275 7.63 5,553.72 11,000.83 90.13 121.65 8,705.51 8,616.81 4,006.84 4,007.93 5,936,391.575 702,880.076 2.69 5,584.56 11,095.59 89.98 121.87 6,705.42 8,616.72 4,056.72 4,088.50 5,936,343.842 702,961.929 0.28 5,679.15 11,190.57 90.16 121.85 8,705.31 8,616.61 4,108.85 4,169.17 5,936,295.854 703,043.888 0.19 5,773.97 11,285.12 90.04 11829 8,705.14 8,616.44 4,154.22 4,250.98 5,936,250.663 703,126.916 3.77 5,866.13 11,379.27 90.34 118.35 8,704.83 8,616.13 4,197.43 4,334.62 5,936,209.677 703,211.665 2.09 5,961.39 11,474.03- 90.62 113.84 8,704.04 8,615.34 4,237.61 4,420.43 5,936,171.770 703,298.495 2.67 6,054.67 11,566.30 92.43 111.72 8,701.53 8,612.83 4,274.10 4,507.31 5,936,137.591 703,386.299 2.96 6,146.69 11,663.13 92.74 107.87 8,697.25 8,608.55 4,306.17 4,596.42 5,936,107.877 703,476.228 4.07 6,238.01 7/13/2018 3:00:12PM Page 8 COMPASS 5000.1 Build 61D b BP B ER P Final Survey Report UGHES a GE company Company: North America - ALASKA - BP Local Coordinate Reference: Well 01-36 Project: PBU TVD Reference: 01-36 ACTUAL Def @ 88.70usft (P272 Actual) Site: 01 MD Reference: 01-36 ACTUAL Def @ 88.70usft (P272 Actual) Well: 01-36 North Reference: True Wellbore: 01-36 Survey Calculation Method; Minimum Curvature Design: 01-36 Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azl (azimuth) TVD TVDSS NIS E/VV Northing Easting DLeg V. Sec (usft) (1) V) (usft) (usft) (usft) (usft) (usft) (usft) (°NOOusft) Waft) 11,758.25 91.70 105.92 8,693.56 8,604.86 -4,333.80 4,687.37 5,936,082.665 703,567.860 2.32 6,328.25 11,851.73 88.29 104.79 8,693.57 8,604.87 -4,358.54 4,777.49 5,936,060.302 703,658.605 3.84 6,416.17 11,946.42 87.95 104.30 8,696.68 8,607.98 4,382.31 4,869.10 5,936,038.959 703,750.800 0.63 6,504.73 12,041.19 89.67 105.75 8,698.65 8,609.95 -0,406.87 4,960.60 5,936,016.820 703,842.915 2.37 6,593.67 12,135.19 89.82 105.53 8,699.06 8,610.36 4,432.22 5,051.12 5,935,993.875 703,934.065 0.28 6,682.25 12,229.97 89.49 105.10 8,699.63 8,610.93 -4,457.25 5,142.53 5,935,971.262 704,026.101 0.57 6,771.38 12,325.31 89.42 105.82 8,700.54 8,611.84 -4,482.66 5,234.42 5,935,948.282 704,118.619 0.76 6,861.12 12,419.97 90.16 105.27 8,700.89 8,612.19 4,508.03 5,325.62 5,935,925.329 704,210.447 0.97 6,950.27 12,514.19 89.73 101.95 8,700.98 8,612.28 4,530.20 5,417.18 5,935,905.584 704,302.556 3.55 7,037.87 12,609.94 88.01 100.85 8,702.87 8,614.17 4,549.12 5,511.01 5,935,889.144 704,396.855 2.13 7,125.46 12,704.12 83.82 99.69 8,709.58 8,620.88 -4,565,87 5,603.43 5,935,874.841 704,489.672 4.62 7,21064 12,735.35 81.62 99.69 8,713.53 8,624.83 4,571.08 5,633.96 5,935,870.434 704,520.332 7.04 7,238.60 12,765.92 79.69 99.98 8,718.50 8,629.80 -4,578.23 5,663.68 5,935,866.068 704,550.175 6.38 7,265.85 12,797.24 77.33 100.59 8,724.73 8,636.03 -4,581.71 5,693.88 5,935,861.387 704,580.504 7.77 7,293.69 12,831.07 75.07 101.45 8,732.80 8,644.10 -4,587.99 5,726.12 5,935,855.962 704,612.902 7.12 7,323.66 12,892.60 73.36 102.10 8,749.54 8,660.84 4,600.07 5,784.09 5,935,645.414 704,671.159 2.96 7,377.99 12,923.57 72.01 102.46 8,758.76 8,670.06 4,606.36 5,812.97 5,935,839.890 704,700.203 4.50 7,405.22 12,955.17 69.99 102.63 8,769.05 6,680.35 4,612.85 5,842.14 5,935,834.172 704,729.526 6.41 7,432.80 12,986.94 67.83 103.00 8,780.48 8,691.78 4,619.42 5,871.04 5,935,828.363 704,758.589 6.89 7,460.21 13,018.21 66.55 103.43 8,792.60 8,703.90 4,626.01 5,899.10 5,935,822.517 704,786.812 4.29 7,486.94 13,050.47 65.22 103.85 8,805.78 8,717.08 4,632.95 5,927.71 5,935,816.331 704,815.597 4.29 7,514.32 13,080.80 63.88 104.53 8,818.81 8,730.11 4,639.66 5,954.27 5,935,810.322 704,842.314 4.86 7,539.89 13,113.28 62.05 105.13 8,833.58 8,744.88 4,647.07 5,982.23 5,935,803.659 704,870.464 5.87 7,567.01 13,144.62 60.46 105.48 8,848.65 8,759.95 4,654.32 6,008.73 5,935,797.108 704,897.148 5.17 7,592.85 13,175.29 59.35 105.30 8,864.03 8,775.33 4,661.36 6,034.32 5,935,790.743 704,922.906 3.65 7,617.81 13,269.75 54.93 105.59 8,915.27 8,826.57 4,682.48 6,110.78 5,935,771.647 704,999.896 4.69 7,692.47 13,364.19 55.05 104.42 8,969.45 8,880.75 4,702.51 6,185.49 5,935,753.599 705,075.105 1.02 7,765.07 7/132018 3:00: 12PM Page 9 COMPASS 5000.1 Build 81D by Company: North America - ALASKA - BP Project: PBU Site: 01 Well: 01-36 Wellbore: 01-36 Design: 01-36 Survey MD (usft) 13,457.91 13,552.95 13,590.85 13,623.00 41/2' 13,625.00 Projection to TD Casing Points BP Final Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: BA ER F�UGHES GEwmpany Well 01-36 01-36 ACTUAL Def @ 88.70usft (P272 Actual) 01-36 ACTUAL Def @ 88.70usft (P272 Actual) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Inc Azi (azimuth) TVD TVDSS WS EIW Northing Eating Diameter DLeg V. Sec Name (in) (in) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 55.02 103.37 9,117.72 9,023.16 8,934.46 4,720.95 6,260.05 5,935,737.129 705,150.116 7.000 0.92 7,836.62 55.02 102.48 9,077.65 8,988.95 4,738.37 6,335.94 5,935,721.719 705,226.442 0.77 7,908.70 55.14 101.18 9,099.34 9,010.64 4,744.74 6,366.36 5,935,716.153 705,257.012 2.83 7,937.22 55.15 100.72 9,117.72 9,029.02 4,749.75 6,392.26 5,935,711.827 705,283.036 1.18 7,961.28 55.15 100.69 9,118.86 9,030.16 4,750.06 6,393.87 5,935,711.565 705,284.656 1.18 7,962.77 Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 128.00 20" 20.000 26.000 3,840.00 10 3/4" 10.750 13.520 13,623.00 9,117.72 41/2' 5.500 6.215 10,061.00 8,674.09 7" 7.000 9.875 Approved By: Jose Vazquez - Tech Support Engineer 7/132018 3:00.12PM Page 10 COMPASS 5000.1 Build 81D 0 m 11 I t04,. IR IG North America - ALASKA - BP PBU 01 01-36 01-36 01-36 WP16 Anticollision Summary Report 13 July, 2018 BAT IGI0 1 a GE company A OGCC BP BA, ICER bp Anticollision Report BAT Ecempany Company: North America - ALASKA - BP Project: PBU Reference Site: 01 Site Error: 0,00usft Reference well: 01-36 Well Error: 0.00usft Reference Wellbore 01-36 Reference Design: 01-36 WP16 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 01-36 01-36 ACTUAL Def @ 88.70usft (P272 Actual) 01-36 ACTUAL Def @ 88.70usft (P272 Actual) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Onset Datum Reference 01-36 WP16 From Fitter type: NO GLOBAL FILTER: Using user defined selection 8 filtering criteria (usft) Survey (Wellbore) Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surfs": Elliptical Conic Survey Program Date 7/13/2018 From To (usft) (usft) Survey (Wellbore) 80.94 454.03 1_Gyro SS 13-1/2" (01-36) 492.54 861.14 2_OTK MWD 13-1/7' (01-36) 916.20 916.20 3_GyroSS 13-1/2"(01-36) 998.28 3,787.78 4_OTK MWD 13-1/2" (01-36) 3,862.08 10,031.42 5_ATK MWD 9.7/8" (01-36) 10,101.03 13,625.00 6_ATK MWD 6-1/8" (01-36) Tool Name Description GYD-CT-DMS Gyrodata cont.drillpipe m/s MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal GYD-CT-DMS Gyrodata cont.drillpipe m/s MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal 7/13/2018 1:24:49PM Page 2 of 4 COMPASS 50001 Build 81D AOGCC BP bp Anticollision Report Company: North America - ALASKA - BP Local Coordinate Reference: Project: PBU TVD Reference: Reference Site: 01 MD Reference: Site Error: O.00usft North Reference: Reference Well: 01-36 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore 01-36 Database: Reference Design: 01-36 WP16 Offset TVD Reference: JER HES Well 01-36 01-36 ACTUAL Def @ 88.70usft (P272 Actual) 01-36 ACTUAL Def @ 88.70usft (P272 Actual) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well -Wellbore -Design (usft) (usft) (usft) (usft) 01 01-04-01-04-01-04 412.21 400.00 209.35 10.13 199,22 Pass -Major Risk 01 -04 -01 -04A -01-04A 412.21 400.00 209.35 10.13 199.22 Pass - Major Risk 01 -04 -01 -04B -01-04B 421.22 425.00 209.49 10.27 199.21 Pass - Major Risk 01-05 - 01-05 - 01-05 414.18 400.00 91.87 10.65 81.22 Pass - Major Risk 01 -05 -01 -05B -01-05B 13,868.53 14,296.00 96.38 429.40 -313.67 FAIL - Major Risk 01-05 - 01-05PB1 - 01-05PB1 414.18 400.00 91.87 10.65 81.22 Pass - Major Risk 01-06-01-06-01-06 1,097.47 1,075.00 51.27 17.93 33.36 Pass - Major Risk 01 -06 -01 -06A -01-06A 1,104.32 1,075.00 51.36 18.06 33.33 Pass - Major Risk 01-07-01-07-01-07 1,547.64 1,500.00 145.37 33.56 111.82 Pass - Major Risk 01 -07 -01 -07A -01-07A 1,547.64 1,500.00 145.37 33.56 111.82 Pass - Major Risk 01-07 - 01-07APB1 - 01-07APB1 1,547.64 1,500.00 145.37 33.56 111.82 Pass -Major Risk 01-08-01-08-01 A8 1,863.90 1,775.00 236.83 35.98 200.88 Pass -Major Risk 01-08-01-08A-01-OBA 1,846.83 1,750.00 236.21 35.61 200.60 Pass -Major Risk 01-08-01-08APB1-01-08APB1 1,646.83 1750.00 236.21 35.34 200.88 Pass -Major Risk 01-09-01-09-01-09 2,180.11 2,050.00 334.65 58.51 276.20 Pass -Major Risk 01 -09 -01 -09A -01-09A 2,163.87 2,025.00 333.90 57.58 276.34 Pass - Major Risk 01-10 - 01-10 - 01-10 2,471.55 2,300.00 421.05 80.33 340.82 Pass - Major Risk 01-10-01-1 OAXX-01-1 OA Plan 2,471.55 2,300.00 421.05 80.33 340.82 Pass - Major Risk 01-11 - 01-11 - 01-11 Out of range 01-28-01-28-01-28 1,663.62 1,600.00 172.85 30.33 142.54 Pass - Major Risk 01 -28 -01 -28A -01-28A 1,663.62 1,600.00 172.85 30.17 142.70 Pass - Major Risk 01-29-01-29-01-29 1,754.16 1,675.00 202.39 33.17 169.22 Pass - Major Risk 01-30-01-30-01-30 1,983.72 1,875.00 278.03 43.66 234.39 Pass - Major Risk 01 -30 -Plan 01 -30a -01-30a wp02 1,970.75 1,850.00 277.49 43.16 234.34 Pass - Major Risk 01-31-01-31-01-31 2,072.95 1,950.00 303.43 45.78 257.67 Pass - Major Risk 01-34-01-34-01-34 2,274.86 2,125.00 359.39 56.52 302.89 Pass -Major Risk 01 -34 -01 -34A -01-34A 2,276.85 2,125.00 359.44 56.58 302.90 Pass -Major Risk 01-36-01-36-01-36 WP16 13,922.70 13,920.00 0.00 390.66 -370.00 FAIL - Major Risk 03 03-16 - 03-16 - 03.16 Out of range 03-16 - 03-16A - 03-16A Out W range 03.24-03.24-03-24 12,247.84 12,900.00 417.50 363.73 69.79 Pass - Major Risk 03 -24 -03 -24A -03-24A 12,119.97 13,150.00 250.83 353.57 -68.19 FAIL - Major Risk 03 -24 -03 -24B -03-24B 12,289.06 12,850.00 423.37 363.00 73.49 Pass - Major Risk 12 12-02 - 12-02 - 12-02 Out of range 12-05 - 12-05ALl - 12-05ALl Out of range 12-05 - 12-05ALl PB1 - 12-05ALl PB1 Out of range 12-28 - 12-28 - 12-28 Out of range 12-28 - 12-28A - 12-28A Out of range 12-32 - 12-32 - 12-32 Out of range 7/13/2018 1:24:49PM Page 3 of 4 COMPASS 5000.1 Build 81D AOGCC BP BA, �(ER bp Anticollision Report UGHES GEcompaM Company: North America- ALASKA - BP Project: PBU Reference Site: 01 Site Error: O.00usft Reference Well: 01-36 Well Error: 0.00usft Reference Wellbore, 01-36 Reference Design: 01-36 WP16 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 01-36 01-36 ACTUAL Def @ 88.70usff (P272 Actual) 01-36 ACTUAL Def @ 88.70usff (P272 Actual) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference Depths are relative to 01-36 ACTUAL Def @ 88.70usft Coordinates are relative to: 01-36 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27.OGP-Use, AK Central Meridian is 150° 0' 0.000 W ° Grid Convergence at Surface is: 1.51° Ladder Plot 600 I I I aso I o I C o J J______ I I ro a I I rn 300 d I I 0 � I y 150 U _ ___ ___ ___ _______ _-_ __---------------------------- --_ ___ I I __ i____ 0 0 2500 5000 75000 10000 12500 15000 Meas�U A6X p `2500 usftfin) $ 01-04,01-04A,01-04AV7 -A- 01-09,01-09A,01-09AV1 } 0316,0316A,0316AV5 $ 01-04,01-046,01-04BVO -F 01-10,01-10,01-10V2 $ 03-24,03-24,03.24\/1 -1- 01-05,01-05,01-05\/3 $ 01-10,01-10AXX,01-10A Plan 5V0 $ 03-24,03-24A,0324AV1 -IAr- 01-05,01-05B4O1-05BV71 $ 01-11,01-11,01-11 V2 $ 0324,03-248,0324BVO -W 01-05,01-05PB1,01-05PB1 V2 $ 01-28,01-28,01-28V1 -IF 0332,03-32B4O332BV0 -0- 01-06,01-06,01-06V1 $ 01-28,01-28.4,01-28AV0 -F 12-02,12-02,12-02V8 -f 01-06,01-OSA,01-06AV1 $ 01-29,01-29,01-29V7 -A- 12-05,12-054L1, 1245ALl VO $ 01-07,01-07,01-07V5 -A- 01-30,01-30,01-00\/1 -+- 12-05,12-05ALIPB1, 12-05ALIPBI VO $ 01-07,01-07A,01-07AV1 -*- 01-00, Plan01-00a,01-30awp02V1 $ 12-28,12-28,12-28 V1 01-07 01 7AP 1 1 7AP 1 V1 01-31,01-31,01-31 12- 12-2 12-28A V 7/132018 124:49PM Page 4 of 4 COMPASS 5000.1 Build 81D AOGCC Printed 7/31/2018 4'54'. 11PM North America - ALASKA - BP Pepe 1 of 3 Cementing Report Common Well Name: 07-38 / OH Report no.: 1 Report dart: 6/79/2078 fol Project: Pau —__-- Site'. 01 - _--- -- -- Spud Date/rime: 6I15Y2016 Evert Type: DRE- ONSHORE (DON) _ Start Date: 8/13/2016 Ertl Date: 7/1/2018 AFE No.: Contractor: PARKER DRILLING CO. Rig NamdNo- PARKER 272 Rig Release: 7/6/2018 X3-018i (7,883,308.00 ) BPUOI: USA00006193 Adive datum: 01-36 ACTUAL Der @88.70usft (above Mean Sas Level) General Information Job type: Primary Cement job start date/time: 6/18/2018 2.00PM Job end date/time: 6/19/2018 630P Cement Company: SCHLUMBERGER Cementer: KYLE CHRISTENSEN Cemented String: SURFACE CASING String Size: 10.750 (in) String Set TMD: 3,840.21 (usft) Hole Size: 13.500 (in) Pipe Movement - Pipe Movement: RECIPROCATING Rotating Time (Start-End): RPM: Rotating Torque (ind/avg/max): (ft-lbt) Reciprocating Time (Start-End): Recip Drag Up/Down: - (kip) SPM: Stroke Length: FIUW Name: SPACER Fluids (1 of 3) Slurry Type. SPACER Purpose: SPACER Class'. Description: MUD PUSH 11 Density: 10.00 (ppg) Yield. Mix Water Ratio: Excess: Mix Method Sacks Used: Water Volume: Excess Slurry Volume: 0.0 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 100.0 (bbl) Excess Measured From: Mud Type: Density: 9.15 (ppg) PV: 17.00 (cp) YP: 17.000 (Ibf/100W) Viscosity: 0.00 (c/qt) Gels 10 Sec: 10.000 (Ibf/100ft2) Gels 10 Min: 14.000 (Ibf/100f -) fBdd Name: CEMENT Flulde (2 of 3) Slurry Type: CEMENT Purpose: PRIMARY Class: LITE Descriphon: LEAD SLURRY Density: 11.00 (ppg) Yield: 1.9100 (ft'/sk) Mix Water Ratio: 6.876 (gal/sk94) Excess: Mix Method: ON-THE-FLY Sacks Used: 2,298.60 (9411b sacks) Water Volume: 376.3 (bbl) Excess Slurry Volume: Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 782.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 9.15 (ppg) PV: 17.00 (cp) YP'. 17.000 (Ibf/100ft) Viscosity: 0.00 (srgt) Gels 10 Sec. 10.000 (Ibf/1001t� Gels 10 Min: 14.000 (Ibf/100112) Additives Name Type Amount Units Concentration Unit D047 ANTIFOAMAGENT 0.050 GAUSX D185 DISPERSANT 0.060 GAUSX D177 RETARDER 0.030 GAUSX Printed 7/31/2018 4'54'. 11PM North America - ALASKA - BP Paps 2 013 Cementing Report Common Well Name: 01-36 / OH Report no.: 1 Report date: 6/19/2018 Project: PBU Site: O7 Spud Dame: 6/152018 Everd Type: DRL- ONSHORE (DON) Start Dale: 8/13/2018 End Date: 7/12018 AFE No.: Contractor. PARKER DRILLING CO. RigNarllelNc.: PARKER 272 Rig Release: 7/62018 X3-018YT-C: (7,883,309.00) BPUOI: USA00006193 ive datum: 07-36 ACTUAL Det @88.70usR (above Mean Sea Level) Act Fluid Testa Thick time Thick Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength (hr) temp. (%) temp. (=30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (F) ("F (°F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) ("F (min) sl 'F min 6.17 0.00 80.00 Fluid Name: CEMENT Flula (3 of 3) Slurry Type: CEMENT Purpose: PRIMARY Class: G -CLASS Description: TAIL SLURRY Density: 15.80(ppg) Yield: 1.1600 (fP/sk) Mix Water Retia. 5.137 (gal/sk94) Excess: 40.00(%) MitMethod: ON -THE -FLY Sacks Used: 256.50 (941b sacks) Water Volume: 31.4 (bbl) Excess Slurry Volume: 15.1 (bol) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 53.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 9.15 (ppg) PV: 17.00 (op) YP: 17.000 (Ibf/1008 Viscosity: 0.00 (s/crt) Gets 10 Sec: 10.000 (Ibf/1008') Gels 10 Min. 14.000 (Ibf/100ff') Additives Name Type Amount Units Concentration Unit D047 ANTIFOAM AGENT 0.050 GAL/SX D085 DISPERSANT 0.300 %BWOC D157 FLUID LOSS 0.400 %BWOC D186 ACCELERATOR 0.100 GAL/SX Fluid Testa Thick time Thick Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength (hr) temp. (%) temp. (cd30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) (°F) ('F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) ("F) min `F min 3.68 0.00 80,00 105.0 68.00 1,000.00 Printed 7/31/2018 4:54: 11PM Printed 7/312018 4:54:11 PM North America - ALASKA - BP Page 3 of 3 Cementing Report Common Well Name. 01-36 / OH Report no. 1 Report date: 8/19/2018 Project: PBU Site 01 i 'i Spud Date/Time: 6/15/2018 Event Type DRL-ONSHORE (DON) Start Date : 8/13/2018 End Date: 7/1/2018 I AFE No.: Contractor PARKER DRILLING CO. Rig Name/No.. PARKER 272 " Rig Release: 7/6/2018 XM18YT-C'. (7,883,309.00 ) BPUOI: USA00006193 TActive datum: 01-36 ACTUAL Def @88 70usk (above Mean Sea Level) stapes Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Tap Bottom plug Pressure Float Pressure Returns Circulate Cmt Vol to Total Annular no. (usft) (usft) Rate Press. Plug Plug eUm,d Bumped Hem Hem Prior Surface Mud Lost Flow (gpm) (psi) (hr) (bbl) (bbl) After (PQ (min) 1 PRIMARYCEMENT 0.00 3,640.00 Y Y y Y Pumping schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Bh static Pumped Disp. Rate TMD TMD Pmp date/time job Used temp. temp. (bbl) Rate (bbl/min) (usft) (usft) (scf) bbilmin Tests Casing Test Shoe Teat Liner Top Test Test Pressure: 3,500.00 (psi) FIT/LOT: (ppg) Liner Overlap: (usft) Time: 30 (min) Tool: N Positive Test: (ppg) Positive Test Tool: N Cement Found between Shoe and Collar'. N Open Hole Length. (usk) Negative Test: (ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure'. (psi) How Determined: Bond Quality: TOC Sufficient : N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator. Temp Survey: N Remedial Cement Required: N Him Prior to Log: (hr) Haw Determined: Printed 7/312018 4:54:11 PM North America - ALASKA - 8P Page 1 of 3 Cementing Report Common Wall Nems: 01-38 / OH Report no.. 2 Report tlale' 6/25/2018 Project: PBU Site: 01 Spud Date/time: 6!1512018 Event Type: DRL- ONSHORE (DON) Start Date: 6/13/2018 Entl Date: 7/1Y2018 AFE No.: X3-018YT-C (7,883,309.00) Contractor: PARKER DRILLING CO. Rg Name/No.: PARKER 272 Rig Release: 7/8/2018 BPUOI: USA00000193 Active datum'. 01-36 ACTUAL Der @88.70uaft (above Mean Sea Level) General Mimmation Job type: Primary Cement job start date/time: 6/25/2018 3:OOPM Job end date/time: 6/25/201 B 530P Cement Company: SCHLUMBERGER Cementer: KYLE CHRISTENSEN Cemented String: INTERMEDIATE CASING 1 String Size: 7.000 (in) String Set Ti 10,061.38 (usft) Hole Size: 9.875 (in) Pipe Movement Pipe Movement: RECIPROCATING Rotating Time (Start-End): RPM. 17 (rpm) Rotating Torque (inittavg/ri (ft-Ibf) Reciprocating Time (Start-End). Recip Drag Up/Dovm. - (kip) SPM: Stroke Length: Fluid Name: SPACER Fluids (1 of 3) Slurry Type: SPACER Purpose. SPACER Class: Description: MUD PUSH II Density: 11.00 (ppg) Yield Mix Water Ratio: Excess: Mix Method: BATCH Sacks Used: Water Volume: Excess Slurry Volume: 0.0 (bbl) Density Measured by: Other Volume: Total Vol in Well: Slurry Volume: 40.0 (bbl) Excess Measured From: Mud Type: Density: 10.70 (pi PV: 13.00 (cp) YP: 18.000 (I61/101 Viscosity: 43.00 (s/qt) Gels 10 Sec: 6.000 (Ibf/loi Gels 10 Min: 11.000 (Ibri FIUW Name: CEMENT Fluids 12 of 3) Slurry Type. CEMENT Purpose. PRIMARY Class: LITE Description: LEAD SLURRY Density: 11.50 (ppg) Yield1.7200 (11 sit) Mix Water Ratio: Excess: 7.00(%) Mix Method. ON-THE-FLY Sacks Used: 783.50 1 sacks) Water Volume: 0.0 (1 Excess Slurry Volume: 15.7 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 240.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 10.70 (ppg) PV: 13.00 (cp) YP: 18.000 (11 0oft2) Viscosity: 43.00 (s/qt) Gels 10 See. 6.000 (11 00fF) Gels 10 Min. 11.000 (Ibfi Additives Name Type Amount Units Concentration Unit 0047 ANTIFOAMAGENT 0.050 %BWOC D065 1.000 %BWOC 0167 0.250 %BWOC D177 0.070 %BWOC Printed 7/31/2018 4.54:09PM Panted 7/31/2018 4:54:09PM North America - ALASKA - BP Pepe 2 of 3 Cementing Report Common Well Name: 01-36 / OH Report no . 2 Report tlale: 6/25/2018 —_ -. - Protect: PBU_ _ - Site: 01 - _.. _— _. --- - - - - -_ - ' Spud Oale/iime: fi/15/2018 Event Type: DRL- ONSHORE (DON) Start Date. 6/13/2018 End Date: 7/1/2018 AFE No.: Contractor: PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rig Release. 7/6/2018 I X3-018YT-C (7,883,309 00 ) - _ BPUOI: USA00006193 Active - —.-- -__---- - -- datum'. 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) Fluid Neer. CEMENT Fluids (3 of 3) Slurry Type: CEMENT Purpose: PRIMARY Class: G-CLASS Description: TAILSLURRY Density: 15.80(ppg) Yield: 1.1600 (11'/sk) Mix Water Ratio: 5.207 (gaVsk94) Excess: 30.00(%) Mix Method: ON-THE-FLY Sacks Used: 164.50 (941b sacks) Water Volume: 20.4 (bbl) Excess Slurry Volume: 7.8 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 34.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: Density: 10.70 (ppg) PV: 13.00 (cp) YP: 18.000 (Ibf/100112) Viscosity: 43.00 (s/qt) Gels 10 Sec: 6.000 (Ibf/100112) Gels 10 Min: 11.000 (Ibf1100fN) AddMYes Name Type Amount Units Concentration Unit D206 ANTIFOAMAGENT 0.100 GAUSX D047 ANTIFOAMAGENT 0.100 GAUSX D065 DISPERSANT 0.500 %BWOC D600 G GAS-BLOCK 2.000 GAUSX D167 FLUID LOSS 0.100 % BWOC D177 RETARDER 0.015 GAUSX Fluid Tests Thick time Thick Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength (hr) temp. (%) temp. (cc/30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 ('F) ("F) (°F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) ("F) min psi 'F min 5.53 90.00 0.00 80.00 30.0 130.00 1,000.00 spies Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom Plug Pressure Float Pressure Returre Circulate Vol to Total Annular no. (ustt) just) Rate Press. Plug Plug Bumped Bumped Held Held JCmt Prior Surface Mud Lost Flow (gpm) (psi) (hr) (bbl) (bbl) Atter (psi) (min) 7 RIMARY CEMENT 4,884.00 10,061.00 Y V y y Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Pumped Disp. Rate TMD TMD Pmp date/time job Used 113hstaitic temp. temp. (bbl) Rate (bbl/min) (usft) (us11) (scf) bbgmin Panted 7/31/2018 4:54:09PM Printed 7/3112018 4.54.09PM North America - ALASKA - BP Page 3 of 3 Cementing Report Common Well Name: 07-36 / OH Report no.: 2 Report date: 8!25/2018 Project: PBU - --- _ Site: 07 Spud DateRme: 6/15/2018 Event T -ONSHORE(DON) Type: DRL-ONSHORE DON Start Date: 8/13/2018 Entl Date: 7/72016 AFE Ni Contractor PARKER DRILLING CO. Rig Name/No.: PARKER 272 Rig Release: 7/8/2018 X3-01BYT-C: (7,883,309.00) BPUOI: USAOOOO6193 Active datum: 01-36 ACTUAL Def @88.70us8 (above Mean Sea Level) Tab Casing Teat Shoe Test Liner Top Teat Test Preasu a 3,500.00 (psi) FITILOT: (pPg) Liner Overlap: (ueft) Time: 30 (min) Tool: N Positive Test: (ppg) Positive Test Tool: N Cement Found behveen Shoe and Collar: N Open Hole Length: (usff) Negative Test: (ppg) Negative Test Tool N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tod: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined: CALCULATED Bond Quality: TOC Sufficient: Y CET Run: N Job Rating: Bond Quality: If Unsuaeesful, Detection Indicator. Tamp Survey: N Remedial Cement Required: N Him Prior to Log: (hr) How Determined: Printed 7/3112018 4.54.09PM Pnnted 7/312018 4'.58'.00PM North America - ALASKA - BP Paget of Cementing Report Common Well Name: 01-38 / OH Report no.: 3 'Report date: 7/2/2018 Project: PBU Site: 01 Spud Date/Time6/152018 Event Type: COM- ONSHORE (CON) Sten Date: 7/12018 End Date: 7/82018 AFE No.: Contractor PARKER DRILLING CO. Rig NamelNo.: PARKER 272 Rig Release: 7/a/2018 X3-018YT-C: (2,722,188.00 ) BPUOI: USA00006193 Active datum. 01-36 ACTUAL Def @88.70usft (above Mean Sea Level) _ General Information Job type. Primary Cement job start date/time: 7/2/2018 710OPM Job end datettime: 7/2/2018 9:OOPM Cement Company: SCHLUMBERGER Cementer. KEITH PIERCE Cemented Stnng: PRODUCTION LINER 1 String Size: 4.500 (in) String Set TMD: 13,623.00 (usft) Hole Size: 6.125 (in) Pipe Movement Pipe Movement: RECIPROCATING Rotating Time (Start-End): RPM: Rotating Torque (mit/avg/max): (ft-lbf) Reciprocating Time (Start-End): Recip Drag Up/Dovm: - (kip) SPM: Stroke Length. Fluid Name: SPACER Fluids (7 of 2) Slurry Type: SPACER Purpose: SPACER Class. Description: MUD PUSH II Density: 12.00 (1 Yield: Mix Water Ratio: Excess: Mix Method: ON-THE-FLY Sacks Used. Water Volume: Excess Slurry Volume: 0.0 (bol) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 40.0 (bbl) Excess Measured From: Mud Type. Density: 8.85 (PPg) PV: 6.00 (cp) YP: 15.000 (lbril oof') Viscosity: 37.00 (&/qt) Gels 10 Sec. 6.000 (11 DOW) Gels 10 Min: 7.000 (Ibf/100ft-) Fluid Name: CEMENT Fluids (2 of 2) Slurry Type CEMENT Purpose PRIMARY Class: G-CLASS Description: TAIL SLURRY Density: 15.80 (ppg) Yield' 1.1700 (1PIsk) Mix Water Ratio: 5.215 (gallsk94) Excess: 30.00(%) Mix Method: ON-THE-FLY Sacks Used: 412.50 (941b sacks) Water Volume: 51.2 (bol) Excess Slurry Volume: 19.8 (bbl) Density Measured by: DENSOMETER Other Volume. Total Vol in Well: Slurry Volume: 86.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type. Density: 8.85 (ppg) PV: 6.00 (cp) YP: 15.000 Qm/1001!-) Viscosity: 37.00 (s/qt) Gels 10 Sec: 6.000 (I1of/10(lift-) Gels 10 Min: 7.000 (Im/10011-) Pnnted 7/312018 4'.58'.00PM Printed 7/31/2018 4.58:OOPM North America - ALASKA - BP Pape 2 or 3 Cementing Report Common Well Name: 01-36 / OH -rReport no.: 3 Report data 7/2/2018 Project: PBU Site: 01 Spud DaterTime'. 6/15/2018 Event T e: COM-ONSHORE CON YP ( ) Start Date. 7/1/2018 I End Date: 7/8/2018 - - I AFE No.: Contractor: PARKER DRILLING CO. Rig Name/No.' PARKER 272 Rig Release: 7/6/2018 X3-018YT-C: (2,722,188.00) BPUOI USA00006193 Active datum: 01-36 ACTUAL Det @88.70usft (above Mean Sea Levep - _ AddlBves Name Type Amount Units Concentration Unit D047 ANTIFOAMAGENT 0.100 GAUSX D206 ANTIFOAMAGENT 0.100 GAL/SX D065 DISPERSANT 0.600 %BWOC D167 FLUID LOSS 0.100 %BWOC D600 GAS-BLOCK 2.000 GAUSX D177 RETARDER 0.050 GAUSX Fluid Tomb Thick time Thick Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength (hr) temp. (%) temp. (cc/30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 ('F) (°F) (°F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) min (psi) `F (min) 6.27 90.00 0.00 80.00 42.0 179.00 1,000.001 1 Stag" Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottomplugpee Pressure Float Pressure Rehums Circulate Cmt Vol to Total Annular no. (usft) (usft) Rate Press. Plug Plug eum eumped Rem Hete Prior Surface Mud Lost Flow (gpm) (psi) (psi) (min) (hr) (bbl) (bbl) After 1 RIMAR) CEMENT 9,890.00 13,623.001 v la mping SChsdule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH cir7BhstaticPumped Disp. Rate TMD TMD Pmp date/timejob Used temp (bbl) Rate (bbl/min) (usft) (usft) (scf) bbVmin Printed 7/31/2018 4.58:OOPM Printed 7/31/2018 4:58:OOPM North America - ALASKA - BP Page 3 of 3 Cementing Report Common Well Name: 01-36 / OH _ _ Srte: 01 Report no.: 3 Report date. 7r212018 Spud DateRime: 6/15/2018 —_ Project PBU .._.- _ _- Event Type: COM -ONSHORE (CON) ( _ _ Start Date. 7/1/2018 End Date 7/8/2018 AFE No.: ( _--- - -- - - --- - X3-01 BYT-C: 2,722,188.00 ) Contractor PARKER DRILLING CO. - Rig Name/No.: PARKER 272 Rig Release: 7/8/2018 a — BPUOI: USA00006183 - -� Active datum. 01-36 ACTUAL Def (8J88.70usfl (above Mean Sea Level) TWO Casing Test Shoe Test Liner Top Teat Test Pressure: 3,500.00 (psi) FIT/LOT: (ppg) Liner Overlap: (usft) Time: 30 (min) Tao]: N Positive Test(ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Toal: N Log/Survey Evaluation Interpretation Summery CBL Run. N Cement Top: (use) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Him Prior to Lag'. (hr) How Determined: Printed 7/31/2018 4:58:OOPM S ATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION Reviewed eP.I. Supry�yi„ _ , iZZ'13 DIVERTER Test Report for: PRUDHOE BAY UNIT 01-36 Comm Contractor/Rig No.: Parker 272 " PTD#: 2180440 " DATE: 6/15/2018 - Inspector Guy Cook lnsp Source Operator: BP EXPLORATION (ALASKA) INC. Operator Rep: Brett Anderson Rig Rep: Darrel Massie Inspector Well Class: DEV Inspection No: divGDC180615083601 Related Insp No: MISC. INSPECTIONS: GAS DETECTORS: Visual Alarm Methane: P . _ P Hydrogen Sulfide: -P _ P Gas Detectors Mise: NA NA TEST DATA P/F Location Gen.:_ P Housekeeping: P Warning Sign P- 24 hr Notice: P Well Sign:_ P _ Drlg. Rig. P. Mise: NA GAS DETECTORS: Visual Alarm Methane: P . _ P Hydrogen Sulfide: -P _ P Gas Detectors Mise: NA NA TEST DATA MUD SYSTEM: DIVERTER SYSTEM: Visual Alarm Size P/F Trip Tank: P P Designed to Avoid Freeze-up?_ _P Mud Pits: FP ✓ FP ✓ Remote Operated Diverter? P Flow Monitor: P P- No Threaded Connections? P Mud System Mise: NA NA Vent line Below Diverter? P Diverter Size: 21.25 P _ Hole Size: 13.5 P Vent Line(s) Size: 16 P Vent Line(s) Length: 36.66 P ACCUMULATOR SYSTEM: Closest Ignition Source: 135 P Time/Pressure P/F Outlet from Rig Substructure: 50.5 P Systems Pressure: 3075 P Vent Line(s) Anchored: _ P Pressure After Closure: 2200 P Turns Targeted / Long Radius: P 200 psi Recharge Time: 14 P Divert Valve(s) Full Opening: P Full Recharge Time: 57 p Valve(s) Auto & Simultaneous: P Nitrogen Bottles (Number of): 14 P Annular Closed Time: 42 - P Avg. Pressure: 2082 P Knife Valve Open Time: 34 P " Accumulator Mise: 0 NAI I Diverter Misc: 0 NA _ Number of Failures: 2 Test Time: 4.5 Remarks: The mud pit audible and visual alarms failed initial. The sensor was recalibrated and passed the retest. THE STATE °fALASKA Kenneth Allen GOVERNOR BILI, WALKER Engineering Team Lead BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 W W W.a0gcc.alask0.gev Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 01-36 BP Exploration (Alaska), Inc. Permit to Drill Number: 218-044 Surface Location: 4646' FSL, 3840' FEL, SEC. 08, TION, RI 5E, UM Bottomhole Location: 136' FNL, 2940' FWL, SEC. 16, TI ON, R1 5E, UM Dear Mr. Allen: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French Chair DATED this ZS day of April, 2018. STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMIS, PERMIT TO DRILL 20 AAC 25.005 R�E�V" C1ryA►n`�'i VTL 4/,75/1$ •y-/ .F 1p401 Revised 5/2017 This permit is valid for 24 months from the date f Ip� I20 AAE 25.005(g)) Submit Forth and /sl�y~TJ` Attachments in Duplicate -TV Ia. Type ofWork: 1b. osed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑ 1c. Specify if well is proposed for: Drill - 0 Lateral ❑ StratiPropgraphic Test ❑ Development - Oil 0. Service - Wnj ❑ Single Zone 0 - Coalbed Gas ❑ Gas -Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone 11 Geothermal ❑ Shale'Gas ❑ 2. Operator Name: 5. Bond Blanket 0. Single Well ❑ 11. Well Name and Number. BP Exploration (Alaska), Inc Bond No. 29SIO5380 - PBU OI -36 , 3 Address: - 8. Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchoraine. AK 99519-6612 MD: 13996' ' TVD: 8735' PRUDHOE BAY, PRUDHOE OIL - 4a. Location of Well (Governmental Section). 7, Property Designation (Lease Number): ADL 028329, 028328 & 028331 Surface: 4646' FSL, 3840' FEL, Sec. Oe, T10N, R1 5E, UM g DNR Approval Number: 13. Approxi ma spud date: Top of Productive Horizon1486' FSL, 602' FEL, Sec. 08, T10N, RISE, UM : 79-179 Jun 018 � fir✓ I 9. Acres in Property: 2501 & 2560 14. Distance to Nearest Property: Total Depth: 136' FNL, 2940' PYvL, Sec. 16, T10N, RISE, UM 21075 4b, Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 86.0 - feet 15. Distance to Nearest Well Open Surface: x- 698768 - y- 5940291 Zone - ASP 4 GL Elevation above MSL: 39.0 -feet to Same Pool: 260 16. Deviated wells: Kickoff Depth: 300 - feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035 Maximum Hole Angle: 110 degrees 'L Downhole: 3351 Surface: 2 VT 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement 0antity, c.f. or sacks Grade ou lin Len th MD TVD TVD (includino sta edata 215.5# A-53 80'Surface Surface 80' 80' 260 sx Arctic Set (ADom%.1 WH:asmqWeight 45.5# 3757' Surface Surface 3757' 3466' 2136 sx LiteCrete, 255 sx ClassG' 26# L-80 V mTo HC 9932' Surface Sudace 9932' ' 8673' 522 sx Class'G' 12.6# 13Cr85 VamT 782' 8558' 13996' • 8735' 466 sx Claw 'G' ig, PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (tt): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (it): Effect. Depth TVD (1t): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (1t): Perforation Depth TVD (it): Hydraulic Fracture planned? Yes ❑ No 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch 0 Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements RI 21. Verbal Approval: Commission Representative: Date hereby certify a e foregoing is true and me proure approved harem wn not be deviated from without prior written approval. Contact Name Sperry, Nathan Authorized Name Allen, Kenneth W Contact Email Nathan.SperryCbp.win Authorized Title Engineering Team Lead Contact Phone 907-5644258 q Authorized Signature Date 2/>Z2 Commission Use Only Permit to Drill I©_ 7.7- —'4 Permit Approval �1 See cover letter for other Number: API: 50-O�—Z�L'U�---�)-��1 Date: p requirements: Conditions of approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Other. 130P f,5 ; � 35o d nS Samples req'd: Yes ❑/ No 9 Mud log req'd: Yes ❑ No 6311 -T fC � H2S measures Yes Gd No ❑/Directional req'd: Yes G?/ No ❑ Y>/ I//Q r )—e -l/? / r 5 svy 7LO5 (� p ¢ / cr Spacing exception req'd: Yes ❑ No Gd Inclination -only svy req'd: Yes ❑ No / F/eW O q, cid ` Z' WJa r'✓ rc/ -, 16 �� Ll rr I) .'z r.1 Post initial injection MIT mq'd: Yes ❑ No APPROVED BY y Z Approved by: COMMISSIONER THE COMMISSION Date: C1ryA►n`�'i VTL 4/,75/1$ •y-/ .F 1p401 Revised 5/2017 This permit is valid for 24 months from the date f Ip� I20 AAE 25.005(g)) Submit Forth and /sl�y~TJ` Attachments in Duplicate -TV by To: Alaska Oil & Gas Conservation Commission From: Nathan Sperry, ODE Date: March 22, 2018 RE: 01-36 Permit to Drill The 01-36 well is scheduled to be drilled by Parker 272 in June 2018. This grassroots well is a horizontal producer targeting the'Sag River formation. The planned well is a three string design using 10-3/4" surface casing, 7" intermediate casing, and 4-1/2" production liner. The surface casing will be set in the SV4. The intermediate casing will be set in the Sag River. The production interval will be completed with a cemented and perforated liner. Z,1-43 V -E- The maxi a ' ipated surface pressure from the Sag River with a full column of gas from TD to surface s 2, p i (assumes 5.8 ppg EMW most likely pore pressure and a 0.1 psi/ft gas gradient). The we wi I be filled by Parker 272 using their 5,000 psi four preventer BOP stack (3 rams and an annular). OP rams and annular will be tested to 3,500 psi. A detailed operations summary is included with the permit application. If there are any questions concerning information on 01-36, please do not hesitate to use the contact information below. Nathan Sperry Office: (907) 564-4258 Cell: (907) 268-8416 Email:nathan.soerrvCilbp com Attachments: Well Bore Schematic Directional Package BOPE Schematic Diverter Line Layout Diagram Well Head Schematic Tree Schematic 01-36 PTD 1 3/22/2018 Planned Well Summary Well Ot-36 Well Type Producer Target Sag River ✓ Ob'ective Current Status Grass Roots Well Estimated Start Date: 6/01 1 Time to complete: 1 31.2 Da s Surface Northing Easting Offsets TRS Location 5,940,291 698,768 4,646' FSL / 3,840' FEL 10N 15E Sec 8 - Planned KOP: 300' MD Planned TD -_7 14,000' MD / 8,649' TVDss Ri Parker 272 - 1 GL -RT: 47.0 1 RTE ref MSL : 86.0 Directional — Baker Hughes WP11a KOP: 300' MD - NorthingEastin TVDss Offsets TRS Target t: —110° in the production section All offset wells pass 8P anti -collision scan criteria, but some offsets must Close Approach Wells: be shut-in to pass scan criteria — reference "Surface and Anti -Collision Surf. Csg 5,939,434 699,701 3,380' 1515.4' FNL / 2346.5' 10N 15E Sec 8 Pt —260' FWL Target 2: CM1 5,937,504 701,790 8,086' 1779.6' FSL / 902.4' FEL 10N 15E Sec 8 Target TaCs Ptrget 3: 7 ° 5,937,218 702,099 8,587' 1485.5' FSL / 602.0' FEL 10N 15E Sec 8 Tar et4 5,936,675 702,687 8,623' 927.1' FSL / 30.4' FWL 10N 15E Sec 8 Tar et 5 5,936,131 703,744 8,627' 354.5' FSL / 1010.0' FWL 1 O 15E Sec 9 Target 6 5,935,862 704,703 8,638' 59.6' FSL / 1960.6' FWL 1 O 15E Sec 9 Target 7 1 5,935,694 705,688 8,649' 135.2' FNL / 2339.6' FEL 10N 15E Sec 16 Planned KOP: 300' MD Planned TD -_7 14,000' MD / 8,649' TVDss Ri Parker 272 - 1 GL -RT: 47.0 1 RTE ref MSL : 86.0 Directional — Baker Hughes WP11a KOP: 300' MD - -28° in the surface section Maximum Hole Angle: —400 in the intermediate section —110° in the production section All offset wells pass 8P anti -collision scan criteria, but some offsets must Close Approach Wells: be shut-in to pass scan criteria — reference "Surface and Anti -Collision Issues" section. Surye Pro ram: Reference attached directional program. Nearest Pro a Line: —21,075' ' Nearest Well within Pool: —260' 01-36 PTD 2 3/22/2018 Formation Tops and Pore Pressure Estimate Formation Depth TV Pore Pressure G1 400 8.43 Ice BPRF 1950 8.43 Ice SV6 2130 8.43 Water EOCU 2763 8.43 Water SV5 2770 8.43 Water SV4 2821 8.43 Water SV3 3450 8.43 Water SV2 3647 8.43 Water BaseSV2 4057 8.43 Water SV1 4058 9.5 Water UG4 4640 9.5 Water UG4A 4665 9.5 Water UG3 4839 9.5 Water UG1 5632 9.5 Water WS2 6110 9.5 Water BaseWS2 6349 9.5 Water WS1 6350 8.48 Water BaseWS1 6605 8.48 Water CM3 6606 8.83 CM2 7084 9.8 CM1 8086 9.8 BaseCM1 8221 9.8 THRZ 8222 10.1 BHRZ 8390 10.1 LCU 8418 9.95 TJA 8484 9.95 TSGR 8587 5.8 Gas/Oil TSHU 8616 7.43 Oil TSAD 8693 7.34 Gas/OiINVater II//K iGGMF� WG, 8.7 -- 4r, 7- 42', 4', i—%%4� 01-36 PTD 3 3/22/2018 Casing/Tubing Program Hole Size Liner/ Wt/Ft Grade Conn Length Top Bottom pH Tbg O.D. Ibf100ft2 API FL HTHP FL MBT MD MD / TVDss 42" 20" x 34" 215.5# A-53 - 80' Surface 1672/ 80' 13-1/2" 10-3/4" 45.5# L-80 BTC 3,757' Surface 3,757'/ 3,380' 9-7/8" 7" 26# L-80 VAM TOP HC 91932' Surface 9,932'/ 8,586' 6-1/8" 4-1/2" 12.6# 13Cr-85 VAM TOP 4,214' 9,782' 13,996'/ 8,648' (150' la Tubing 4-1/2" 12.6# 13Cr-85 VAM TOP 9,787' Surface 9'787 / 8'475 (-5' into liner PBR Mud Program Surface Mud Properties: MMS 13-1/2" Hole Section Depth Interval �PPg) PV (cp) YP (Ib/1 0ft2) API FL LSR-YP (24 - 6) pH PV (cp) Ibf100ft2 API FL HTHP FL MBT m 3,757 MD - TSW V ;2 Surface - 3,757' MD 8.7-9.2 - 6-20 1 35-80 <15 25-60 10-11 Intermediate Mud Properties: LSND Polymer Fluid 1 6.1/8" Hole Section Depth Interval Density 9-7/8" Hole Section Depth Interval Density PV (cp) Ibf100ft2 API FL HTHP FL MBT pH 3,757 MD - TSW V ;2 9.1 - 11.0 • 8-18 18-25 <5 NA <20 8.5 - 9.5 fa3 TSV1 - TCM3 9.8 - 11.0. 8-18 18-25 <5 NA <20 8.5-9.5 z= ^ TCM'- THU 10.1-11.0.1 8-18 18-25 <5 NA <20 8.5-9.5 �:THRZ-9,932' 10.3-11.0• 8-18 18-25 <5 <10 <20 8.5-9.5 Production Mud Properties: Water Based Polymer Fluid 1 6.1/8" Hole Section Depth Interval Density PV (cp)Ib/100ft= Cased Hole: API FL HTHP FL MOT pH 9,932' MD - TD 1 8.6-9,8 1 <8 1 12-20 1 <12 NA <4 8,5-9.5 Logging Program 13-1/2" Surface Sam le Catchers - not required for surface hole DrillinDiron / GR /Res - Open Hole: Ne Cased Hole: I None 9-7/8" Intermediate Sam le Catchers - as required b Geology Drillin Dir/ GR / RES Open Hole: I None Cased Hole: I None 6.1/8" Production Sam Is Catchers -as required by Geology Drilling: Dir/ GR / RES / NEU / DEN / microresistivit image to Oen Hole: None Cased Hole: None 01-36 PTD 4 3/22/2018 Cement Program Casing Size 10-3/4" 46.6# L-80 BTC Surface Casing Lead Oen hole volume + 350% excess in permafrost 140% excess below permafrost Basis Lead TOC Surface Tail Oen hole volume + 40% excess + 80 ft shoe track Tail TOC 500 It MD above casing shoe Spacer 100 bbls of 10 ppg Viscosified Spacer Mud Push II Total Cement Lead 726.4 bbls 4079 cult, 2136 sks 11.0 ppq LiteCRETE - 1.91 cuft/sk Volume Tail 53.0 bbls, 298 cult, 255 sks 15.8 ppg Class G —1.17 cuft/sk Temp BHST 65° F Casing Size Fr26# L-80! 13CR-80 Vam Too HC Intermediate Casing Lead N/A Basis Lead TOC N/A Tail Oen hole volume + 40% excess + 80 it shoe track Tail TOC 1600 it MD above casing shoe Spacer 40 bbls of 12.5 ppg Viscosified Spacer Mud Push II Total Cement Lead N/A Volume Tail 108.6 bbls, 610 cult, 522 sks 15.8 ppg Class G —1.17 cuft/sk Temp BHST 184° F Casing Size 4-112" 12.6# 13CR-86 Vam Top Production Liner Lead N/A Basis Lead TOC N/A Tail Oen hole volume + 30% excess + 80' shoe track + liner la + 200'4" DP x 7" LNR annulus Tail TOC Top of liner Spacer 20 bbls of 11 ppg Viscosified Spacer Mud Push it Total Cement Lead N/A Volume Tail 97.2 bbls, 545.7 cult, 466.4 sks 15.8 ppg Class G— 1.17 cuft/sk Temp BHST 192° F Surface and Anti -Collision Issues Surface Proximity: No wells will be affected by the Parker 272 rig shadow. Anti -Collision: All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan criteria: • 01-05B — Shut in at surface w/ a tubing tail plug installed downhole and a full column of 1 % KCI or seawater with diesel freeze protect. • 03-24 — Abandoned by the 03-24A sidetrack. • 03-24A — Abandoned by the 03-24B sidetrack. • 03-24B — Shut in at surface. Offset well ownership information All offset wells identified within 200 ft of the proposed wellbore are operated by BP. 01-36 PTD 5 3/22/2018 Hydrogen Sulfide ✓ DS01 is considered an H2S site. Recent H2S data from the pad is as follows: Faults There are 4 Dlanned fault crossinas for the 01-36 well traiectorv. Fault name Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level 01-05B 10 ppm 02/08/2013 #2 Closest SHL Well H2S Level 01-06A 0 ppm 01/19/2016 #1 Closest BHL Well H2S Level 01-05B 10 ppm 02/08/2013 #2 Closest BHL Well H2S Level 03-32B 21 ppm 05/16/2017 #3 Closest BHL Well H2S Level 03-24A 5 ppm 11/16/2017 #4 Closest BHL Well H2S Level 12-28A 30 ppm 03/22/2015 Max Recorded H2S on Pad/Facility 01-07A 194 ppm 04/09/1990 Faults There are 4 Dlanned fault crossinas for the 01-36 well traiectorv. Fault name MD intersect TVDss intersect Magnitude Lost circulation potential Fault 1 8597' -7561' ^10' Low Fault 2 11345' -8620' ^10' Low Fault 3 12439' -8631' <10' Low Fault 4 13288' -8640' <10' Low Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB Environmental Advisors (659-5893) for guidance. 01-36 PTD 6 3/22/2018 Well Control The 13-1/2" surface hole will be drilled with a diverter (see attached diverter layout). The 9-7/8" hole and 6-1/8" hole sections will be drilled with well control equipment consisting of 5,000 psi working pressure rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP test frequency for 01-36 will be 14 -days with function test every 7 -days. Except in the event of a significant operational issue that may affect well integrity or pose safety concerns, an extension to the 14 -day BOP test period should not be requested. 9-7/8" Intermediate Interval Maximum anticipated BHP 3,179 psi in the WS2 at 6,349' TVDss 9.5 ppg EMW, 6,436' TVD Maximum surface pressure 1,749 psi from the Sag River (0.10 psi/ft gas gradient to surface, Kick tolerance 8,587' TVDss 8,674' TVD Planned BOP test pressure 25 bbls with 11.8 apg frac gradient. Kick tolerance Assumes 5.8 ppg pore pressure in the Sag River+ 0.5 ppg kick Liner To—Packer intensity and 10.5 ppg MW Planned BOP test pressure Rams test to 3,500 psi / 250 psi Annular test to 3,500 psi / 250 psi Inte rit Test — 9-7/8" hole LOT after drilling 20'-50' of new hole 7" Casing Test 3,500psi' surface pressure 6-1/8" Production Interval Maximum anticipated BHP 3 1 pst in TSAD at 8,693' TVDss 7.34 ppg EMW, 8,780' TVD Maximum surface pressure ,473 psi in TSAD 0.10psi/ft gas gradient to surface Kick tolerance Infinge with >8.9 ppg frac gradient. Assumes 7.34 ppg pore pressure in the Ivishak + 0.5 ppg kick intensity and 8.6 ppg MW Planned BOP test pressure Rams test to 3,500 psi / 250 psi Annular test to 3,500 psi 1250 psi Inte riTe6-1/8" hole st FIT after drilling20'-50' of new hole Liner To—Packer 3,500 psi surface pressure Planned completion fluids 8.5 ppg seawater / 2000 it TVD diesel 01-36 PTD 7 3/22/2018 Variance Requests 1. To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line (<1000 ft). This is a variance from 20 AAC 25.033. Procedures/Safeguards with paddle removed: • Fluid levels will be monitored in the pits for both gains and losses while drilling. Alarms will be set to indicate if gain or loss of more than 10 bbls has occurred. • The well will be monitored for flow when the pumps are off at each connection. • The planned 8.7 — 9.2 ppg fluid will provide over -balance to formation fluid. 0 1 -36 PTD 8 3/22/2018 Drill and Complete Operations Summary Pre -Rig Operations 1. Install and survey 20" conductor and cellar box. 2. Weld on landing ring. 3. Level pad and prepare location. Rig Operations 1. MIRU Parker 272. - 2. Nipple up diverter system and function test. Notify AOGCC 24 hours in advance of test. 3. MU 13-1/2" surface motor drilling assembly (DIR/GR/RES) and drill to TD at -3,757' MD. . Perform wiper trip. POOH and LD drilling assembly. 4. Run 10-3/4" casing to TD and cement. Test casing to 3500 psi. 5. Nipple down diverter system. Nipple up 11" wellhead system. Nipple up BOPE and test to 3500 psi. a. (Configured from top to bottom: 13-5/8" annular preventer, 4-1/2" x 7" VBRs in the upper cavity, blind/shear rams, mud cross and 2-7/8" x 5" VBR's in the lower cavity). ➢ Test 4-1/2" x 7" rams to 250 psi / 3,500 psi with 5" and 7" test joints. ➢ Test 2-7/8" x 5 rams to 250 psi / 3,500 psi with 4" and 5" test joints. ➢ Test annular to 250 psi / 3,500 psi with 4" and 5" test joint. 6. MU 9-7/8" intermediate RSS drilling assembly (DIR/GR/RES) and drill shoe track and 20'-50' formation. 7. Perform LOT. 8. Drill to 9-7/8" section to TD at -9,932' MD, topsetting the Sag River formation. Perform wiper trip as needed. POOH and LD drilling assembly. 9. Run 7" casing to TO and cement. Test casing to 3500 psi. 10. Install 7" casing packoff and test to 3500 psi. Inject freeze protect into 7" x 10-3/4" annulus. 11. Swap 4-1/2" x 7" variable bore rams to 2-7/8" x 5" variable bore rams and test same to 3,500 psi with a 4" test joint. 12. MU 6-1/8" production RSS drilling assembly (DIR/GR/RES/NEU/DEN/Image Log) and drill shoe track and 20'-50' formation. 13. Perform FIT. <- 14. Drill 6-1/8" section to TD at -13,996' MD in the Sag River. Perform wiper trip. POOH and LD drilling assembly. 15. Run 4-1/2" liner to TO and cement. Set hanger and liner top packer. POOH and LD liner running assembly. 16. Test liner / liner top packer to 3500 psi. 17. Perforate the Sag River per subsurface team (estimating 3,000' MD). 18. Run and land 4-1/2" completion. 19. Reverse circulate completion brine with corrosion inhibitor. Drop ball and rod and set production packer. Individually test tubing and IA to 3500 psi. 20. Shear GLV and circulate diesel freeze protect cap as needed. Set TWC and test to 3500 psi. 21. Nipple down BOPE. Nipple up adapter and dry hole tree and test to 4500 psi. 22. RDMO Parker 272. 01-36 PTD 9 3/22/2018 Post -Rig Operations 1. Pull TWC and perform tree work as needed 2. Pull B&R/RHC. Set GL design 01-36 PTD 10 3/22/2018 01-36 Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures A. Surface Hole: The SVs are expected to be at 8.43 ppg EMW. Formation pressures will be controlled with 8.7 — 9.2 ppg mud to section TD. The surface casing is planned to be set above possible free gas zones. B. Intermediate Hole: The Ugnu is expected to be at 9.5 ppg EMW. This section will TD in the Sag River. Formation pressures will be controlled with 9.1 — 10.3 ppg mud (up to 11.0 ppg for shale stability if needed). C. Production Hole: The Sag River is expected to be 5.8 ppg EMW. The top of the Ivishak will be penetrated and is expected to be 7.34 ppg. Reservoir pressures will be controlled by using 8.6 — 9.8 ppg mud. 11. Lost Circulation/Breathing A. Surface Hole: There are no expected fault crossings in this interval. The risk of lost circulation is low. B. Intermediate Hole: There is 1 expected fault crossing in this interval. The risk of lost circulation is low. C. Production Hole: There are 3 expected fault crossings in this interval. The risk of lost circulation is low. III. Fault Locations Fault name MD intersect TVDss I intersect Ma nitude Lost circulation potential Fault 1 8597' -7561' —10' Low Fault2 11345' -8620' —10' Low Fault 3 12439' -8631' <10' Low Fault 4 13288' -8640' <10' Low IV. Integrity Testing Test Point Test Depth Testtype _ EMW (lb/gal) 10-3/4" Shoe 20'-50' from the shoe LOT 11.8 pp 7" Shoe 20'-50' from the shoe FIT ft 9 nnn V. Hydrogen Sulfide 1 DS01 is considered an H2S site. Recent H2S data from the pad is as follows: VI. Anti -Collision Issues All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan criteria: 01-05B (intermediate and production drilling, shut in at surface and tubing tail plug installed w/ a full column of 1 % KCI or seawater with diesel freeze protect), 03-24B (production drilling, shut in at surface). CONSULT THE DS01 DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. 01-36 PTD 11 3/22/2018 Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level 01-05B 10 ppm 02/08/2013 #2 Closest SHL Well H2S Level 01-06A 0 ppm 01/19/2016 #1 Closest BHL Well H2S Level 01-05B 10 ppm 02/08/2013 #2 Closest BHL Well H2S Level 03-32B 21 ppm 05/16/2017 #3 Closest BHL Well H2S Level 03-24A 5 ppm 11/16/2017 #4 Closest BHL Well H2S Level 12-28A 30 ppm03/22/2015 Max Recorded H2S on Pad/Facility 1 01-07A 1 194 ppm 04/09/1990 VI. Anti -Collision Issues All offset wells pass BP anti -collision scan criteria, but some offsets must be shut-in to pass scan criteria: 01-05B (intermediate and production drilling, shut in at surface and tubing tail plug installed w/ a full column of 1 % KCI or seawater with diesel freeze protect), 03-24B (production drilling, shut in at surface). CONSULT THE DS01 DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. 01-36 PTD 11 3/22/2018 TRl£= W9IFFAD= ACTUATOR= OKB. W - —E KOP= Max I Datum Datum PROPObED 01-36 F 3A' • NOTES:CHROMETBG M-ITXFMM� •a ff-mlnmu� •• • : ®_ ' ..•.mom. —___ ..•.• c.. .kll WELL: U7-36 PEUTNo: ARW, 50-021_-00 SEC , T R R E, ' FSL & FB SP Bcploration (Alaska) by North America - ALASKA - BP PBU 01 01-36 PLAN 01-36 Plan: 01-36 WP11A BP Well Plan Survey Report 22 March, 2018 BA ER 0 BAT GE company Company: North America - ALASKA - BP Project: PBU Site: 01 Well: 01-36 Wellbore: PLAN 01-36 Design: 01-36 WP11A BP BP Well Plan Survey Report BAI'�UGHES IGHES Local Co-ordinate Reference: Well 01-36 TVD Reference: 01-36 PLAN @ 86.00usft (P272 PLAN) MD Reference: 01-36 PLAN @ 86.00usft (P272 PLAN) North Reference: Tale ' Survey Calculation Method: Minimum Curvature Database: EDM R5K- Alaska PROD - ANCPI Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK [4267'15864) Using Well Reference Point Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734'1586• Using geodetic scale factor Site 01, TR -10-15 _._... She Position: Northing: 5,941,932.140 usft Latitude: 70° 14'43.905 N From: Map Easting: 697,237.600 usft Longitude: 148° 24'24.004 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.50 ° Well 01-36, 01-36 Well Position +N/ -S 0.00 usft Northing: 5,940,290.980 usft Latitude: 70' 14'27.373 N +EI -W 0.00 usft Easting: 698,768.140 usft Longitude: 148° 23' 40.773 W Position Uncertainty 0.00 usft Wellhead Elevation: 39.00 usft Ground Level: 39.00 usft Wellbore PLAN 01-36 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 1�1 11 InTI BGGM2017 7/1/2018 17.33 80.95 57.464 Design 01-36 WP11A Audit Notes: Version: Phase: PLAN Tie On Depth: 47.00 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (1) 47 00 0.00 0.00 140.00 3/2212018 3.41:27PM Page 2 COMPASS 5000.1 Build 81D BP by BP Well Plan Survey Report BAT R GEmmuany Company: North America -ALASKA -BP Description Project: PBU Site: 01 Gyrodata gyro single shots Well: 01-36 MWD MWD -Standard Wellbore: PLAN 01-36 Design: 01-36 WP11A Survey Tool Program Date 3/22/2018 From To MWD+IFR+MS-WOCA (usft) (usft) Survey(Wellbore) MWD 47.00 1,300.00 01-36 WP11A (PLAN 01-36) 1,300.00 3,760.0001-36 WP11A (PLAN O1-36) 1,300.00 3,760.00 01-36 WP11A (PLAN 01-36) 3,760.00 9,935.00 01-36 WP11A (PLAN 01-36) (usft) 3,760.00 9,935.00 01-36 WPI1A(PLAN 01-36) (usft) 9,935.00 13,953.86 01-36 WP11A (PLAN 01-36) 0.00 9,935.00 13,995.55 01-36 WP11A (PLAN 01-36) 14.00 Planned Survey 0.00 5,940,290.980 698,768.140 MD Inc An TVD (usft) (°1 1°1 (usft) 47.00 0.00 0.00 0.00 47.00 100.00 313.99 0.00 0.00 100.00 200.00 698,768.783 0.00 0.00 200.00 1 300.00 2.17 0.00 0.00 300.00 Start Build 1.00 413.96 -2.42 2.51 400.00 698,770.714 1.00 134.00 399.99 486.03 5.65 1.86 134.00 486.00 G1 61361 -10.30 10.67 500.00 698,779.073 2.00 134.00 499.96 600.00 18.18 3.00 134.00 599.86 Start Build 2.00 812.08 -27.23 28.20 700.00 698,797.042 5.00 134.00 699.61 800.00 41.29 7.00 134.00 799.06 900.00 1,007.62 9.00 134.00 898.08 Start DLS 3.00 TFO 037 698,827.656 3.00 1,000.00 -75.91 12.00 134.07 996.40 1,100.00 3.00 15.00 134.11 1,093.62 1,200.00 18.00 134.14 1,189.49 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 01-36 01-36 PLAN @ 86.00usft (P272 PLAN) 01-36 PLAN ,@ 86.00usft (P272 PLAN) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Tool Name Description GVD-GC-SS Gyrodata gyro single shots MWD MWD -Standard MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal MWD MWD -Standard MWD+IFR+MS-WOCA MWD +IFR+Multi Station W/O Crustal MWD MWD -Standard MWD+IFR+MS-WOCA MWD +IFR+Mufti Station W/O Crustal TVDSS NIS E/W Northing Easting DLeg (usft) (usft) (usft) (usft) (usft) ('1100usft) -39.00 0.00 0.00 5,940,290.980 698,768.140 0.00 14.00 0.00 0.00 5,940,290.980 698,768.140 0.00 114.00 0.00 0.00 5,940,290.980 698,768.140 0.00 214.00 0.00 0.00 5,940,290.980 698,768.140 0.00 313.99 -0.61 0.63 5,940,290.391 698,768.783 1.00 400.00 -2.10 2.17 5,940,288.940 698,770.367 1.00 413.96 -2.42 2.51 5,940,288.623 698,770.714 1.00 513.86 -5.45 5.65 5,940,285.677 698,773.930 1.00 61361 -10.30 10.67 5,940,280.965 698,779.073 2.00 713.06 -17.56 18.18 5,940,273.906 698,786.780 2.00 812.08 -27.23 28.20 5,940,264.506 698,797.042 2.00 910.40 -39.89 41.29 5,940,252.190 698,810.470 3.00 1,007.62 -56.14 58.06 5,940,236.397 698,827.656 3.00 1,103.49 -75.91 78.44 5,940,217.171 698,848.554 3.00 TFace ) 0.00 0.00 0.00 0.00 134.00 0.00 0.00 0.00 0.00 0.00 0.00 0.27 0.20 0.16J 3222018 3:41:27PM Page 3 COMPASS 5000.1 Builtl BID 4e Company: North America -ALASKA - BP Project: PBU TVD Reference: Site: 01 MD Reference: Well: 01-36 North Reference: Wellbore: PLAN 01-36 Survey Calculation Method: Design: 01-36 WP11A Database: Planned Survey (usft) MD Inc (usft) (usft) (°) (oll00usft) 1,300.00 21.00 1,400.00 24.00 1,500.00 27.00 1,521.39 27.64 Stan 6996.00 hold at 1521.39 MD 1,600.00 27.64 1,700.00 27.64 1,800.00 27.64 1,900.00 27.64 2,000.00 27.64 2,100.00 27.64 2,142.95 27.64 BPRF 5,940,139.466 2,200.00 27.64 2,300.00 27.64 2,346.15 27.64 SV6 167.75 2,400.00 27.64 2,500.00 27.64 2,600.00 27,64 2,700.00 27.64 2,800.00 27.64 2,900.00 27.64 3,000.00 27.64 3,060.70 27.64 EOCU 227.17 3,068.60 27.64 BF BA ER BP Well Plan Survey Report UGI�ES Local Co-ordinate Reference: Well 01-36 TVD Reference: 01-36 PLAN @ 86.00usft (P272 PLAN) MD Reference: 01-36 PLAN @ 86.00usft (P272 PLAN) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Azi TVD TVDSS NIS EIW Northing Easting DLeg TFace (°) (usft) (usft) (usft) (usft) (usft) (usft) (oll00usft) (°( 134.16 1,283.75 1,197.75 -99.16 102.39 5,940,194.564 698,873.106 3.00 0.14 134.17 1,376.13 1,290.13 -125.81 129.84 5,940,168.639 698,901.246 3.00 0.12 134.18 1,466.37 1,380.37 -155.81 160.71 5,940,139.466 698,932.895 3.00 0.10 134.19 1,485.38 1,399.38 -162.66 167.75 5,940,132.812 698,940.113 3.00 0.09 134.19 1,555.02 1,469.02 -188.06 193.90 5,940,108.091 698,966.924 0.00 0.09 134.19 1,643.60 1,557.60 -220.41 227.17 5,940,076.645 699,001.031 0.00 0,00 134.19 1,732.19 1,646.19 -252.75 260.44 5,940,045.198 699,035.138 0.00 0.00 134.19 1,820.77 1,734.77 -285.09 293.71 5,940,013.751 699,069.245 0.00 0.00 134.19 1,909.36 1,823.36 -317.42 326.97 5,939,982.304 699,103.352 0.00 0.00 134.19 1,997.95 1,911.95 -349.76 360.24 5,939,950.857 699,137.459 0.00 0.00 134.19 2,036.00 1,950.00 -363.65 374.53 5,939,937.350 699,152.109 0,00 0.00 134.19 2,086.53 2,000.53 -382.10 393.51 5,939,919.411 699,171.566 0.00 0.00 134.19 2,175.12 2,089.12 -414.44 426.78 5,939,887.964 699,205.673 0.00 0.00 134.19 2,216.00 2,130.00 -429.36 442.13 5,939,873.452 699,221.411 0.00 0.00 134.19 2,263.71 2,177.71 446.77 460.05 5,939,856.517 699,239.779 0.00 0.00 134.19 2,352.29 2,266.29 -479.11 493.31 5,939,825.070 699,273.886 0.00 0.00 134.19 2,440.88 2,354.88 -511.45 526.58 5,939,793.623 699,307.993 0.00 0.001 134.19 2,529.47 2,443.47 -543.78 559.85 5,939,762.176 699,342.100 0.00 0.00' 134.19 2,618.05 2,532.05 -576.12 593.12 5,939,730.730 699,376.207 0.00 0.00 134.19 2,706.64 2,620.64 -608.46 626.38 5,939,699.283 699,410.314 0.00 0.00 134.19 2,795.23 2,709.23 -640.79 659.65 5,939,667.836 699,444.421 0.00 0.00 134.19 2,849.00 2,763.00 -660.42 679.85 5,939,648.748 699,465.124 0.00 0.00 i 134.19 2,856.00 2,770.00 -662.98 682.47 5,939,646.263 699,467.819 0.00 0.001 312212018 3:41:27PM Page 4 COMPASS 5000.1 Build BIO BP by BP Well Plan Survey Report B UGHES �e romp„v Company: North America - ALASKA - BP Project: PBU Site: 01 Well: 01-36 Wellbore: PLAN 01-36 Design: 01-36 WP11A Planned Survey MD Inc (usft) 3.100.00 27.64 3,126.17 27.64 SW 3,200.00 27.64 3,300.00 27.64 3,400.00 27.84 3,500.00 27.64 3,600.00 27.64 3,700.00 27.64 3,757.19 27.64 10314 Casing -10314" 3,800.00 27.64 3,836.21 27.64 SV3 3,900.00 27.64 4,000.00 27.64 4,058.59 27.64 SV2 4,100.00 27,64 4,200.00 27.64 4,300.00 27.64 4,400.00 27.64 4,500.00 27.64 4,521.42 27.64 BaseSV2 4,522.55 27.64 Still 4,600.00 27.64 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: WeII01-36 01-36 PLAN Q 86.00usft (P272 PLAN) 01-36 PLAN Q 86.00usft (P272 PLAN) True Minimum Curvature EDM RSK - Alaska PROD - ANCP1 Azi TVD TVDSS NIS EIW Northing Easting OLeg (°) (usft) (usft) (usft) (usft) (usft) (usft) ("1100usft) 134.19 2,883.81 2,797.81 -673.13 692.92 5,939,636.389 699,478.528 0.00 134.19 2,907.00 2,821.00 -681.59 701.63 5,939,628.159 699,487.455 0.00 134.19 2,972.40 2,886.40 -705.47 726.19 5,939,604.942 699,512.635 0.00 134.19 3,060.99 2,974.99 -737.81 759.45 5,939,573.496 699,546.741 0.00 134.19 3,149.57 3,063.57 -770.14 792.72 5,939,542.049 699,580.848 0.00 134.19 3,238.16 3,152.16 -802.48 825.99 5,939,510.602 699,614.955 0.00 134.19 3,326.75 3,240.75 -834.82 859.26 5,939,479.155 699,649.062 0.00 134.19 3,415.33 3,329.33 -867.15 892.53 5,939,447.708 699,683.169 0.00 134.19 3,466.00 3,380.00 -885.65 911.55 5,939,429.722 699,702.676 0.00 134.19 3,503.92 3,417.92 -899.49 925.79 5,939,416.262 699,717.276 0.00 134.19 3,536.00 3,450.00 -911.20 937.84 5,939,404.874 699,729.627 0.00 134.19 3,592.51 3,506.51 -931.83 959.06 5,939,384.815 699,751.383 0.00 134.19 3,681.09 3,595.09 -964.16 992.33 5,939,353.368 699,785.490 0.00 134.19 3,733.00 3,647.00 -983.11 1,011.82 5,939,334.942 699,805.475 0.00 134.19 3,769.68 3,683.68 -996.50 1,025.60 5,939,321.921 699,819.597 0.00 134.19 3,858.27 3,772.27 -1,028.84 1,058.86 5,939,290.474 699,853.703 0.00 134.19 3,946.85 3,860.85 -1,061.17 1,092.13 5,939,259.027 699,887.810 0.00 134.19 4,035.44 3,949.44 -1,093.51 1,125.40 5,939,227.581 699,921.917 0.00 134.19 4,124.03 4,038.03 -1,125.85 1,158.67 5,939,196.134 699,956.024 0.00 134.19 4,143.00 4,057.00 -1,132.77 1,165.79 5,939,189.398 699,963.329 0.00 134.19 4,144.00 4,058.00 -1,133.14 1,166.17 5,939,189.043 699,963.714 0.00 134.19 4,212.61 4,126.61 -1,158.19 1,191.93 5,939,164.687 699,990.131 0.00 TFace 1°) 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 322,2018 3.41:27PM Page 5 COMPASS 5000.1 Build 81D by BP BATER BP Well Plan Survey Report UGI ES IGH ny Company: North America - ALASKA - BP Project: PBU Site: 01 Well: 01-36 Wellbore: PLAN 01-36 Design: 01-36 WPIIA Planned Survey MD (usft) 4,700.00 4,800.00 4,900.00 5,000.00 5,100.00 5,179.53 UG4 5,200.00 5,207.75 UG4A 5,300.00 5,400.00 5,404.17 UG3 5,500.00 5,600.00 5,700.00 5,800.00 5,900.00 6,000.00 6,100.00 6,200.00 6,299.34 UG1 6,300.00 6,400.00 6,500.00 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 01-36 01-36 PLAN C 86.00usft (P272 PLAN) 01-36 PLAN Q 86.00usft (P272 PLAN) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Inc Azi TVD TVDSS NIS ENV Northing Easting DLeg TFace 27.64 134.19 (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) 0.00 27.64 134.19 4,301.20 4,215.20 -1,190.52 1,225.20 5,939,133,240 700,024.238 0.00 0.00 27.64 134.19 4,389.79 4,303.79 -1,222.86 1,258.47 5,939,101.793 700,058.345 0.00 0.001 27.64 134.19 4,478.37 4,392.37 -1,255.20 1,291.74 5,939,070.347 700,092.452 0.00 0.00 27.64 134.19 4,566.96 4,480.96 -1,287.53 1,325.01 5,939,038.900 700,126.559 0.00 0.00 27.64 134.19 4,655.55 4,569.55 -1,319.87 1,358.27 5,939,007.453 700,160.665 0.00 0.001 2264 134.19 4,726.00 4,640.00 -1,345.59 1,384.73 5,938,982.443 700,187.791 0.00 0.001 27.64 134.19 4,744.13 4,658.13 -1,352.21 1,391.54 5,938,976.006 700,194.772 0.00 0.00 27.64 134.19 4,751.00 4,665.00 -1,354.71 1,394.12 5,938,973.568 700,197.417 0.00 0.00 27.64 134.19 4,832.72 4,746.72 -1,384.54 1,424.81 5,938,944.559 700,228.879 0.00 0.00 27.64 134.19 4,921.30 4,835.30 -1,416.88 1,458.08 5,938,913.113 700,262.986 0.00 0.00 27.64 134.19 4,925.00 4,839.00 -1,418.23 1,459.46 5,938,911.801 700,264.409 0.00 0.00 27.64 134.19 5,009.89 4,923.89 -1,449.22 1,491.34 5,938,881.666 700,297.093 0.00 0.00 27.64 134.19 5,098.48 5,012.48 -1,481.56 1,524.61 5,938,850.219 700,331.200 0.00 0.00 27.64 134.19 5,187.06 5,101.06 -1,513.89 1,557.88 5,938,818.772 700,365.307 0.00 0.00 27.64 134.19 5,275.65 5,189.65 -1,546.23 1,591.15 5,938,787.325 700,399.414 0.00 0.00 27.64 134.19 5,364.24 5,278.24 -1,578.57 1,624.42 5,938,755.878 700,433.521 0.00 0.00 27.64 134.19 5,452.82 5,366.82 -1,610.90 1,657.68 5,938,724.432 700,467.627 0.00 0.00 27.64 134.19 5,541.41 5,455.41 -1,643.24 1,690.95 5,938,692.985 700,501.734 0.00 0.00 27.64 134.19 5,630.00 5,544.00 -1,675.58 1,724.22 5,938,661.538 700,535.841 0.00 0.00 27.64 134.19 5,718.00 5,632.00 -1,707.70 1,757.27 5,938,630.299 700,569.723 0.00 0.00 27.64 134.19 5,718.58 5,632.58 -1,707.91 1,757.49 5,938,630.091 700,569.948 0.00 0.001 27.64 134.19 5,807.17 5,721.17 -1,740.25 1,790.75 5,938,598.644 700,604.055 0.00 0.00' 27.64 134.19 5,895.76 5,809.76 -1,772.59 1,824.02 5,938,567.198 700,638.162 0.00 0.00 3222018 3:41:27PM Page 6 COMPASS 5000.1 Build 81D b BP BATER p BP Well Plan Survey Report UGHES GE company Company: North America - ALASKA - BP Project: PBU TVDSS Site: 01 EMI Well: 01-36 Easting Wellbore: PLAN 01-36 TFace Design: 01-36 WP11A (usft) Planned Survey (usft) MD Inc (usft) (usft) (°) (°I100usft) fi 600.00 27.64 6,700.00 27.64 6,800.00 27.64 6,838.93 27.64 WS2 0.00 6,900.00 27.64 7,000.00 27.64 7,100.00 27.64 7,108.72 27.64 BaseWS2 134.19 7,109.85 27.64 WS1 1,923.82 7,200.00 27.64 7,300.00 27.64 7,397.70 27.64 BaseWS1 -1,882.19 7,398.83 27.64 CM3 0.00 7,400.00 27.64 7,500.00 27.64 7,517.39 27.64 Start OLS 3.00 TFO 0.19 700,774.589 7,600.00 30.12 7,700.00 33.12 7,800.00 36.12 7,900.00 39.12 7,929.33 40.00 Start 2003.02 hold at 7929.33 MD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 01-36 01-36 PLAN @ 86.00usft (P272 PLAN) 01-36 PLAN @ 86.00usft (P272 PLAN) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Azi TVD TVDSS NIS EMI Northing Easting DLeg TFace (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (°) 134.19 5,984.34 5,898.34 -1,804.92 1,857.29 5,938,535.751 700,672.269 0.00 0.00 134.19 6,072.93 5,986.93 -1,837.26 1,890.56 5,938,504.304 700,706.376 0.00 0.00 134.19 6,161.52 6,075.52 -1,869.60 1,923.82 5,938,472.857 700,740.483 0.00 0.00 134.19 6,186.00 6,110.00 -1,882.19 1,936.77 5,938,460.616 700,753.759 0.00 000 134.19 6,250.10 6,164.10 -1,901.94 1,957.09 5,938,441.410 700,774.589 0.00 0.00 134.19 6,338.69 6,252.69 -1,934.27 1,990.36 5,938,409.964 700,808.696 0.00 0.00 134.19 6,427.28 6,341.28 -1,966.61 2,023.63 5,938,378.517 700,842.803 0.00 0.00 134.19 6,435.00 6,349.00 -1,969.43 2,026.53 5,938,375.775 700,845.777 0.00 0.00 134.19 6,436.00 6,350.00 -1,969.79 2,026.90 5,938,375.420 700,846.162 0.00 000 134.19 6,515.86 6,429.86 -1,998.95 2,056.90 5,938,347.070 700,876.910 0.00 0.00 134.19 6,604.45 6,518.45 -2,031.28 2,090.16 5,938,315.623 700,911.017 0.00 0.00 134.19 6,691.00 6,605.00 -2,062.88 2,122.67 5,938,284.899 700,944.340 0.00 0.00 134.19 6,692.00 6,605.00 -2,063.24 2,123.04 5,938,284.544 700,944.725 0.00 0.00 134.19 6,693.04 6,607.04 -2,063.62 2,123.43 5,938,284.176 700,945.124 0.00 0.00 134.19 6,781.62 6,695.62 -2,095.96 2,156.70 5,938,252.729 700,979.231 0.00 0.00 134.19 6,797.03 6,711.03 -2,101.58 2,162.48 5,938,247.261 700,985.162 0.00 0.00 134.20 6,869.36 6,783.36 -2,129.39 2,191.09 5,938,220.214 701,014.488 3.00 0.19 134.22 6,954.50 6,868.50 -2,165.95 2,228.66 5,938,184.664 701,053.011 3.00 0.17 134.23 7,036.79 6,950.79 -2,205.57 2,269.37 5,938,146.130 701,094.746 3.00 0.16 134.25 7,115.99 7,029.99 -2,248.15 2,313.10 5,938,104.717 701,139.578 3.00 0.15 134.25 7,138.60 7,052.60 -2,261.19 2,326.48 5,938,092.041 701,153.297 3.00 0.14 3222018 3.41:27PM Page 7 COMPASS 5000.1 Build BID BP by BP Well Plan Survey Report BAF�U(ER E company Company: North America - ALASKA -BP Local Co-ordinate Reference: Well 01-36 Project: Pau ND Reference: 01-36 PLAN (a3 86.00usft (P272 PLAN) Site: 01 MD Reference: 01-36 PLAN @ 86.00usft (P272 PLAN) Well: 01-36 North Reference: True Wellbore: PLAN 01-36 Survey Calculation Method: Minimum Curvature Design: 01-36 WP11A Database: EDM R5K - Alaska PROD - Al Planned Survey MD Inc AN TVD TVDSS NIS ENV Northing Easgng DLeg TFace (usft) (usft) (usft) (usft) (usft ) (oan) (usft) 1°1190ustry 1°I 7,970.32 40.00 134.25 7,170.00 7,084.00 -2,279.57 2,345.35 5,938,074.160 701,172.648 0.00 0.14 CM2 8,000.00 40.00 134.25 7,192.73 7,106.73 -2,292.89 2,359.01 5,938,061.214 701,186.658 0.00 0.00 8,100.00 40.00 134.25 7,269.34 7,183.34 -2,337.74 2,405.06 5,938,017.593 701,233.865 0.00 0.00 8,200.00 40.00 134.25 7,345.94 7,259.94 -2,382.59 2,451.10 5,937,973.972 701,281.072 0.00 0.00 8,300.00 40.00 134.25 7,422.55 7,336.55 -2,427.45 2,497.14 5,937,930.351 701,328.279 0.00 0.00 8,400.00 40.00 134.25 7,499.15 7,413.15 -2,472.30 2,543.19 5,937,886.730 701,375.486 0.00 0.00 8,500.00 40.00 134.25 7,575.76 7,489.76 -2,517.15 2,589.23 5,937,843.109 701,422.693 0.00 0.00 8,600.00 40.00 134.25 7,652.36 7,566.36 -2,562.00 2,635.27 5,937,799.488 701,469.900 0.00 0.00 8,700.00 40.00 134.25 7,728.97 7,642.97 -2,606.86 2,681.32 5,937,755.867 701,517.107 0.00 0.00 8,800.00 40.00 134.25 7,805.57 7,719.57 -2,651.71 2,727.36 5,937,712.246 701,564.314 0.00 0.00 8,900.00 40.00 134.25 7,882.17 7,796.17 -2,696.56 2,773.40 5,937,668.625 701,611.521 0.00 0.00 9,000.00 40.00 134.25 7,958.78 7,872.78 -2,741.42 2,819,44 5,937,625.003 701,658,728 0.00 0.00 9,100.00 40.00 134.25 8,035.38 7,949.38 -2,786.27 2,865.49 5,937,581.382 701,705.935 0.00 0.00 I 9,200.00 40.00 134.25 8,111.99 8,025.99 -2,831.12 2,911.53 5,937,537,761 701,753.142 0.00 0.00 9,278.34 40.00 134.25 8,172.00 8,086.00 -2,866.26 2,947.60 5,937,503.588 701,790.125 0.00 0.00 CM1 9,300.00 40.00 134.25 8,188.59 8,102.59 -2,875.98 2,957.57 5,937,494.140 701,800.349 0.00 0.00 9,400.00 40.00 134.25 8,265.20 8,179.20 -2,920.83 3,003.62 5,937,450.519 701,847.556 0.00 0.00 9,454.57 40.00 134.25 8,307.00 8,221.00 -2,945.31 3,028.74 5,937,426.715 701,873.318 0.00 0.00 BaseCM1 9,455.88 40.00 134.25 8,308.00 8,222.00 -2,945.89 3,029.34 5,937,426.145 701,873,934 0.00 0.00 THRZ 9,500.00 40.00 134.25 8,341.80 8,255.80 -2,965.68 3,049.66 5,937,406.898 701,894.763 0.00 0.00 9,600.00 40.00 134.25 8,418.41 8,332.41 -3,010.54 3,095.70 5,937,363.277 701,941.970 0.00 0.00 9,675.18 40.00 134.25 8,476.00 8,390.00 -3,044.26 3,130.32 5,937,330.480 701,977.463 0.00 0.00 BHRZ 9,700,00 40.00 134.25 8,495.01 8,409.01 -3,055.39 3,141.75 5,937,319.656 701,989.177 - 0.00 C 0.00' 31222018 3:41:27PM Page 8 COMPASS 5000.1 Build 81D by BP B BP Well Plan Survey Report F U HESR GEcomn ny Company: North America - ALASKA -BP Local Coordinate Reference: Well 01-36 Project: PBU TVD Reference: 01-36 PLAN @ 86.00usft (P272 PLAN) Site: 01 MD Reference: 01-36 PLAN @ 86.00usR (P272 PLAN) Well: 01-36 North Reference: True Wellbore: PLAN 01-36 Survey Calculation Method: Minimum Curvature Design: 01-36 WP11A Database: EDM R5K - Alaska PROD - ANCP1 Planned Survey MD Inc Azi TVD TVDSS NIS EM Northing Fasting DLag TFace (usR) (°) (°) (usR) (Usk) (usR) (usR) (usR) (usR) (11100usR) (°) 9,711.74 40.00 134.25 8,504.00 8,418.00 -3,060.65 3,147.15 5,937,314.536 701,994.718 0.00 0.00 LCU I 9,797.89 40.00 134.25 8,570.00 8,484.00 -3,099.30 3,186.82 5,937,276.954 702,035.390 0.00 0.00 TJA 9,800.00 40.00 134.25 8,571.61 8,485.61 -3,100.24 3,187.79 5,937,276.035 702,036.384 0.00 000 9,900.00 40.00 134.25 8,648.22 8,562.22 -3,145.09 3,233.83 5,937,232.414 702,083.591 0.00 0.00 9,931.04 40.00 134.25 8,672.00 8,586.00 -3,159.02 3,248.13 5,937,218.872 702,098.247 0.00 0.00 BaseKingak 9,932.35 40.00 134.25 8,673.00 8,587.00 -3,159.60 3,248.73 5,937,218.302 702,098.863 0.00 0.00 Start 20.00 hold at 9932.35 MD - TSGR .7" 9,952.35 40.00 134.25 8,688.32 8,602.32 -3,168.58 3,257.94 5,937,209.578 702,108.304 0.00 0.00 Start Build 15.00 9,969.22 42.53 134.25 8,701.00 8,615.00 -3,176.34 3,265.90 5,937,202.028 702,116.475 15.00 0.00 BaseSag 9,970.58 42.73 134.25 8,702.00 8,616.00 -3,176.98 3,266.56 5,937,201.403 702,117.151 15.00 0.00 TSHU 10,000.00 47.15 134.25 8,722.82 8,636.82 -3,191.48 3,281.45 5,937,187.303 702,132.410 15.00 0.00 10,094.69 61.35 134.25 8,778.00 8,692.00 -3,244.96 3,336.35 5,937,135.289 702,188.700 15.00 0.00 BawShub 10,096.78 61.66 134.25 8,779.00 8,693.00 -3,246.25 3,337.67 5,937,134.039 702,190.053 15.00 000 TSAD 10,100.00 62.15 134.25 8,780.52 8,694.52 -3,248.23 3,339.70 5,937,132.112 702,192.138 15.00 0.00 10,200.00 77.15 134.25 8,815.20 8,729.20 -3,313.47 3,406.67 5,937,068.668 702,260.798 15.00 0.00 10,300.00 92.15 134.25 8,824.50 8,738.50 -3,382.74 3,477.78 5,937,001.294 702,333.710 15.00 0.00 10,352.35 100.00 134.25 8,818.96 8,732.96 -3,419.04 3,515.04 5,936,965.995 702,371.911 15.00 0.00 Start Build 8.00 10,400.00 103.81 134.25 8,809.13 8,723.13 -3,451.57 3,548.43 5,936,934.360 702,406.147 8.00 0.00 10,477.35 110.00 134.25 8,786.65 8,700.65 -3,503.18 3,601.42 5,936,884.162 702,460.472 8.00 0.00 Start 100.00 hold at 10477.35 MD 3/1212018 3:41:27PM Page 9 COMPASS 5000.1 Build 810 BP by BP Well Plan Survey Report BATER..a w CEunra„y Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 01-36 Project: PBU TVD Reference: 01-36 PLAN @ 86.00usft (P272 PLAN) Site: 01 MD Reference: 01-36 PLAN @ 86.00usft (P272 PLAN) Well: 01-36 North Reference: True Wellbore: PLAN 01-36 Survey Calculation Method: Minimum Curvature Design: 01-36 WP11A Database: EDM R5K - Alaska PROD - ANCP11 Planned Survey MD Inc Azi TVD TVDSS NIS EMI Northing Easting DLeg TFace (usft) (°) V) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) 1°1 10,500.00 110.00 134.25 8778.90 8,692.90 -3,518.03 3,616.66 5,936,869.718 702,476.103 0.00 0.00 10,577.35 110.00 134.25 8,752.45 8,666.45 -3,568.75 3,668.73 5,936,820.392 702,529.484 0.00 0.00 Start DLS 8.00 TFO 180.00 10,600.00 108.19 134.25 8,745.04 8,659.04 -3,583.69 3,684.06 5,936,805.868 702,545.202 8.00 180.00 10,700.00 100.19 134.25 8,720.55 8,634.55 -3,651.28 3,753.45 5,936,740.129 702,616.346 8.00 180.00 10,800.00 92.19 134.25 8,709.78 8,623.78 -3,720.60 3,824.60 5,936,672.716 702,689.299 8.00 -180.00 10,814.85 91.00 134.25 8,709.37 8,623.37 -3,730.96 3,835.24 5,936,662.643 702,700.201 8.00 180.00 Start 100.00 hold at 10814.85 MD 10,900.00 91.00 134.25 8,707.88 8,621.88 -3,790.37 3,896.22 5,936,604.867 702,762.727 0.00 -180.00 10,914.85 91.00 134.25 8,707.62 8,621.62 -3,800.73 3,906.06 5,936,594.791 702,773.631 0.00 0.00 Start DLS 6.00 TFO 266.00 11,000.00 90.55 129.16 8,706.47 8,620.47 -3,857.35 3,970.40 5,936,539.863 702,838.843 6.00 -95.00 11,100.00 90.02 123.18 8,705.97 8,619.97 -3,916.35 4,051.09 5,936,483.021 702,920.853 6.00 -95.07 11,199.85 89.49 117.22 8,706.40 8,620.40 -3,966.55 4,137.35 5,936,435.112 703,008.399 6.00 -95.10 Start 225.00 hold at 11199.85 MD 11,200.00 89.49 117.22 8,706.40 8,620.40 -3,966.62 4,137.48 5,936,435.047 703,008.534 0.00 -95.07 11,300.00 89.49 117.22 8,707.30 8,621.30 -4,012.35 4,226.40 5,936,391.677 703,098.629 0.00 0.00 11,400.00 89.49 117.22 8,708.19 8,622.19 -4,058.08 4,315.33 5,936,348.306 703,188.724 0.00 0.00 11,424.85 89.49 117.22 8,708.41 8,622.41 -4,069.45 4,337.43 5,936,337.529 703,211.113 0.00 0.00 Start DLS 4.00 TFO 269.00 11,500.00 89.44 114.21 8,709.12 8,623.12 -4,102.05 4,405.12 5,936,306.726 703,279.643 4.00 -91.00 11,549.85 89.40 112.22 8,709.62 8,623.62 -4,121.70 4,450.93 5,936,288.295 703,325.952 4.00 -90.97 Start 200.00 hold at 11549.85 MD 11,600.00 89.40 11222 8,710.15 8,624.15 -4,140.66 4,497.36 5,936,270.565 703,372.857 0.00 -90.95 11,700.00 89.40 112.22 8,711.19 8,625.19 -4,178.47 4,589.93 5,936,235.212 703,466.388 0.00 0.001 11,749.85 89.40 112.22 8,711.71 8,625.71 -4,197.32 4,636.08 5,936,217.588 703,513.013 0.00 0.00 Start400.00 hold at 11749.85 MD 11,800.00 89.40 112.22 8,712.23 8,626.23 4,216.28 4,682.50 5,936,199.859 703,559.918 0.00 0.00 3222018 3.41:27PM Page 10 COMPASS WW..1 Build BID BP by BP Well Plan Survey Report BAT R GIHES GE I..Pa., Company: North Amedca- ALASKA -BP Project: PBU TVDSS Site: 01 E/W Well: 01-36 Easting Wellbore: PLAN 01-36 (usft) Design: 01-36 WP11A (usft) Planned Survey (usft) MD Inc 112.22 (usft) (°) 8,627.28 11,900.00 89.40 12,000.00 89.40 12,100.00 89.40 12,149.85 89.40 Start 250.00 hold at 12149.86 MO 12,200.00 89.40 12,300.00 89.40 12,399.85 89.40 Start DLS 4.00 TFO 270.00 12,400.00 89.40 12,500.00 89.40 12,600.00 89,41 12,674.85 89.41 Start 400.00 hold at 12674.85 MD 12,700.00 89.41 12,800.00 89.41 12,900.00 89,41 13,000.00 89.41 13,074.65 89.41 Start 400.00 hold at 13074.65 MD 13,100.00 89.41 13,200.00 89.41 13,300.00 89.41 13,400.00 89.41 13,474.85 89.41 Start 235.50 hold at 13474.86 MD 13,500.00 89.41 13,600.00 89.41 3/22/2018 3:4127PM Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 01-36 01-36 PLAN @ 86.00usft (P272 PLAN) 01-36 PLAN C 86.00usft (P272 PLAN) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Azi TVD TVDSS NIS E/W Northing Easting (°) (usft) (usft) (usft) (usft) (usft) (usft) 112.22 8713.28 8,627.28 -4,254.09 4,775.07 5,936.164.505 703,653.449 112.22 8,714.32 8,628.32 -4,291.89 4,867.64 5,936,129.152 703,746.979 112.22 8,715.36 8,629.36 4,329.70 4,960.21 5,936,093.799 703,840.510 112.22 6,715.88 8,629.88 -4,348.55 5,006.36 5,936,076.175 703,887.135 112.22 8,716.40 8,630.40 -4,367.51 5,052.78 5,936,058.445 703,934.040 112.22 8,717.45 8,631.45 -4,405.32 5,145.35 5,936,023.092 704,027.571 112.22 8,718.49 8,632.49 -4,443.08 5,237.79 5,935,987.792 704,120.961 112.22 8,718.49 8,632.49 -4,443.13 5,237.93 5,935,987.739 704,121.101 108.21 8,719.53 8,633.53 -4,477.67 5,331.74 5,935,955.688 704,215.793 104.21 8,720.57 8,634.57 4,505.58 5,427.74 5,935,930.320 704,312.489 101.22 8,721.34 8,635.34 -4,522.05 5,500.75 5,935,915.782 704,385.897 101.22 8,721.60 8,635.60 4,526.94 5,525.41 5,935,911.543 704,410.684 101.22 8,722.62 8,636.62 -4,546.39 5,623.50 5,935,894.686 704,509.243 101.22 8,723.64 8,637.64 -4,565.84 5,721.58 5,935,877.830 704,607.801 101.22 8,724.67 6,638.67 4,585.29 5,819.67 5,935,860.973 704,706.359 101.22 8,725.43 8,639.43 - 4,599.85 5,893.09 5,935,848.357 704,780.130 101.22 8,725.69 8,639.69 -4,604.74 5,917.75 5,935,844.117 704,804.917 101.22 8,726.72 8,640.72 4,624.19 6,015.84 5,935,827.261 704,903.475 101.22 8,727.74 8,641.74 4,643.64 6,113.92 5,935,810,404 705,002.033 101.22 8,728.76 8,642.76 4,663.09 8,212.01 5,935,793.548 705,100.592 101.22 8,729.53 8,643.53 -4,677.65 6,285.42 5,935,780.931 705,174.362 101.22 8,729.79 8,643.79 4,682.54 6,310.09 5,935,776.692 705,199.150 101.22 8,730.81 8,644.81 4,701.99 6,408.18 5,935,759.835 705,297.708 Page 11 DLeg TFace (°1100usft) (°) 0.00 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.01 -90.00 4.00 -89.96 4.00 -89.92 0.00 -89.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.o0 0.00 0.00 0.00 0.00 0.00 1 0.00 0.00 COMPASS 5000.1 Build 81D by Vertical Company: North America - ALASKA - BP Project. PBU (usft) Site: 01 8,673.00 7 Well: 01-36 3,466.00 103/4" Wellbore: PLAN 01-36 8,734.87 4-1/2 Design: 01-36 WP11A (°) Planned Survey -4,721.44 MD Inc 5,935,742.979 (usft) (°) 0.00 13,700.00 89.41 13710.35 89.41 Start 286.00 hold at 13710.35 MD 13,600.00 89.41 13.900.00 89.41 13,996.35 89.41 TD at 13996.35 - 4-112 705,494.824 Casing Points 0.00 An TVD lusftl 101.22 8,731.83 101.22 8,731.94 101.22 8,732.86 101.22 8,733.88 101.22 8,734.87 Measured Vertical Depth Depth (usft) (usft) 9,932.35 8,673.00 7 3,757.19 3,466.00 103/4" 13,996.35 8,734.87 4-1/2 BP EIP Well Plan Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: BA ER -01 F�UGHES E company Well 01-36 01-36 PLAN @ 86.00usft (P272 PLAN) 01-36 PLAN Q 86.00usft (P272 PLAN) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 TVDSS NIS ENV Northing Easting DLeg TFace (usft) (usft) (usft) (usft) (usft) (°1100usft) (°) 8645.83 -4,721.44 6,506.26 5,935,742.979 705,396.266 0.00 0.00 8645.94 -4,723.46 6,516.41 5,935,741.234 705,406.467 0.00 0.00 8,646.86 -4,740.89 6,604.35 5,935,726.123 705,494.824 0.00 0.00 8,647.88 4,760.34 6,702.43 5,935,709.266 705,593.382 0.00 0.00 8,648.87 4,779.08 6,796.94 5,935,693.025 705,688.343 0.00 000 Casing Hole Diameter Diameter Name (in) (in) 7.000 9.875 10.750 13.500 4.500 6.125 3222078 3:41:27PM Page 12 COMPASS 5000.1 Build BID BP 0 bp BP Well Plan Survey Report BAT 6EcI ES Company: North America -ALASKA - BP Project: Pau Site: 01 Well: 01-36 Wellbore: PLAN 01-36 Design: 01-36 WP11A Plan Annotations Measured Depth (usft) 47.00 300.00 600.00 900.00 1,521.39 7,517.39 7,929.33 9,932.35 9,952.35 10,352.35 10,477.35 10,577.35 10,814.85 10,914.85 11,199.85 11,424.85 11,549.85 11,749.85 12,149.85 12,399.85 12,674.85 13,074.85 13,474.85 13,710.35 13,996.35 Vertical Depth (usft) 47.00 300.00 599.86 898.06 1,485.38 6,797.03 7,138.60 8,673.00 8,688.32 8,818.96 8,786.65 8,752.45 8,709.37 8,707.62 8,706.40 8,708.41 8,709.62 8,711.71 8,715.88 8,718.49 8,721.34 8,725.43 8,729.53 8,731.94 8,734.87 Local Coordinates -NI-S +EI -W (usft) (usft) 0.00 0.00 0.00 0.00 -5.45 5.65 -27.23 28.20 -162.66 167.75 -2,101.58 2,162.48 -2,261.19 2,326.48 -3,159.60 3,248.73 -3,168.58 3,257.94 -3,419.04 3,515.04 -3,503.18 3,601.42 -3,568.75 3,668.73 -3,730.96 3,835.24 -3,800.73 3,906.86 -3,966.55 4,137.35 -4,069.45 4,337.43 -4,121.70 4,450.93 -4,197.32 4,636.08 4,348.55 5,006.36 -4,443.08 5,237.79 -4,522.05 5,500.75 -4,599.85 5,893.09 -4,677.65 6,285.42 4,723.46 6,516.41 4,779.08 6,796.94 Comment Start Build 1.00 Start Build 2.00 Start OLS 3.00 TFO 0.27 Start 5996.00 hold at 1521.39 MD Start OLS 3.00 TFO 0.19 Start 2003.02 hold at 7929.33 MD Start 20.00 hold at 9932.35 MD Start Build 15.00 Start Build 8.00 Start 100.00 hold at 10477.35 MD Start DLS 8.00 TFO 180.00 Start 100.00 hold at 10814.85 MD Start DLS 6.00 TFO 265.00 Start 225.00 hold at 11199.85 MD Start DLS 4.00 TFO 269.00 Start 200.00 hold at 11549.85 MD Start 400.00 hold at 11749.85 MD Start 250.00 hold at 12149.85 MD Start DLS 4.00 TFO 270.00 Start 400.00 hold at 12674.85 MD Start 400.00 hold at 13074.85 MD Start 235.50 hold at 13474.85 MD Start 286.00 hold at 13710.35 MD TD at 13996.35 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 01-36 01-36 PLAN @ 86.00usft (P272 PLAN) 01-36 PLAN @ 86.00usft (P272 PLAN) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 3/222018 3.41:27PM Page 13 COMPASS 5000.1 Build 81D N D o r- O o ai Z 3 w m D w Z m C D O F 0 " W D °' D00 vim 3 0' m MN cn tU 1 r a� D 00 �cn ac X M V 00 BP BA�CER Z by Anticollision Report UGHES Emmpany Company: North America - ALASKA - BP Project: PBU Reference Site: 01 Site Error: 0,00usft Reference Well: 01-36 Well Error: 0oousft Reference Wellbore PLAN 01-36 Reference Design: 01-36 WP11A Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 01-36 01-36 PLAN @ 86.00usft (P272 PLAN) 01-36 PLAN @ 86.00usft (P272 PLAN) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 01-36 WP11A Filter type: NO GLOBAL FILTER: Using user defined selection 8 fiftering criteria (usft) Survey (Wellbore) Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,594.94usft Error Surface: Elliptical Conic Survey Tool Program Date 3/22/2018 From To (usft) (usft) Survey (Wellbore) Tool Name Description 47.00 1,300.00 01-36 WP11A (PLAN 01-36) GYD-GC-SS G rodata y gyro single shots 1,300.00 3,760.00 01-36 WP1 IA (PLAN 01-36) MWD MWD - Standard 1,300.00 3,760.0001-36 WP11A(PLAN 01-36) MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal 3,760.00 9,935.0001-36 WP11A(PLAN 01-36) MWD MWD -Standard 3,760.00 9,935.0001-36 WP11A (PLAN 01-36) MWD+IFR+MS-WOCA MWD + IFR +Multi Station W/O Crustal 9,935.00 13,953.8601-36 WP11A (PLAN 01-36) MWD MWD -Standard 9,935.00 13,995.5501-36 WP11A(PLAN 01-36) MWD+IFR+MS-WOCA MWD + IFR + Multi Station W/O Crustal 3222016 3:33:41PM Page 2 of4 COMPASS 5000.1 Build 810 `o%BP BAT(ER �j by Anticollision Report UGHES GEmmpany Company: North America- ALASKA - BP Local Co-ordinate Reference: Well 01-36 Project: PBU ND Reference: 01-36 PLAN @ 86.00usft (P272 PLAN) Reference Site: 01 MD Reference: 01-36 PLAN @ 86.00usft (P272 PLAN) Site Error: O.00usft North Reference: True Reference Well: 01-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore PLAN 01-36 Database: EDM RSK- Alaska PROD -ANCP1 Reference Design: 01-36 WP11A Offset TVD Reference: Offset Datum Summary Site Name Offset Well - Wellbore - Design 01 01-04 - 01-04 - 01-04 01-04 - 01-04A - 01 -D4A 01 -04 -01 -04B -01-04B 01-05-01-05-01-05 01 -05 -01 -058 -01 -OSB 01-05-01-05PB1-01-05PB1 Reference Measured Depth (usft) 433.90 433.90 418.67 411.54 9,912.69 411.54 Offset Measured Depth (usft) 425.00 425.00 425.00 400.00 10,375.00 400.00 Centre to Centre Distance (usft) 209.84 209.84 209.59 91.98 52.72 91.98 No -Go Distance (usft) 10.42 10.42 10.18 10.55 9.47 10.55 Allowable Deviation from Plan (usft) 19942 199.42 199.42 81.43 52.17 81.43 Warning Pass - Major Risk Pass -Major Risk Pass - Major Risk Pass - Major Risk Pass - Minor 1/50 Pass - Major Risk 01-06-01-06-01-06 1,093.85 1,075.00 56.59 17.90 38.72 Pass -Major Risk 01 -06 -01 -06A -01-06A 1,100.69 1,075.00 56.78 18.02 38.79 Pass - Major Risk 01-07-01-07-01-07 1,518.59 1,475.00 159.60 32.48 127.13 Pass -Major Risk 01 -07 -01 -07A -01-07A 1,518.59 1,475.00 159.60 32.48 127.13 Pass - Major Risk 01-07-01-07APB1-01-07APB1 1,518.59 1,475.00 159.60 32.48 127.13 Pass -Major Risk 01-08-01-08-01-08 1,854.98 1,775.00 260.36 34.92 225.45 Pass - Major Risk 01 -08 -01 -08A -01-08A 1,859.51 1,775.00 260.50 35.07 225.45 Pass - Major Risk 01-08-01-08APB7-01-08APB1 1,859.51 1,775.00 260.50 35.07 225.45 Pass - Major Risk 01-09 - 01-09 - 01-09 2,213.12 2,100.00 368.25 56.32 309.99 Pass - Major Risk 01 -09 -01 -09A -01-09A 2,196.31 2,075.00 367.52 57.58 309.97 Pass - Major Risk 01-11-01-11-01-11 8,023.22 8,625.00 753.34 657.49 15146 Pass - Major Risk 01-26-01-26-01-26 7,518.20 8,350.00 959.79 648.22 324.78 Pass - Major Risk 01-26 - 01-26A- 01-26A 7,523.17 8,350.00 960.95 649.13 324.78 Pass - Major Risk 01-28-01-28-01-28 1,656.77 1,600.00 191.19 29.97 161.25 Pass - Major Risk 01 -28 -01 -28A -01-28A 1,656.77 1,600.00 191.19 29.97 161.25 Pass - Major Risk 01-29-01-29-01-29 1,745.95 1,675.00 223.35 32.48 190.87 Pass - Major Risk 01-30-01-30-01-30 1,973.27 1,875.00 305.17 42.16 263.01 Pass -Major Risk 01 -30 -Plan 01 -30a -01-30a wp02 1,982.22 1,875.00 305.45 42.48 262.97 Pass -Major Risk 01-31-01-31-01-31 2,083.58 1,975.00 334.07 44.73 289.35 Pass - Major Risk 01-34-01-34-01-34 2,305.88 2,175.00 395.52 55.18 340.36 Pass - Major Risk 01 -34 -01 -34A -01-34A 2,307.92 2,175.00 395.56 55.23 340.35 Pass - Major Risk 03 03-16-03-16-03-16 13,90441 12,950.00 1,159.36 417.72 811.40 Pass - Major Risk 03 -16 -03 -16A -03-16A Out of range 03-24 - 03-24 - 03-24 12,226.25 13,000.00 352.44 70.07 306.23 Pass - Minor 1/200 03 -24 -03 -24A -03-24A 12,196.73 13,225.00 184.63 43.52 147.87 Pass - Minor 1/200- /2003 03-24 - 03-24B - 03 -24B -24-03-24B-03-248 12,383.84 12,775.00 379.33 76.34 317.40 Pass-Minorl/200 12 12-02-12-02-12-02 12,950.57 12,650.00 1,114.21 353.135 781.33 Pass - Major Risk 12-05-12-05ALl-12-05AL1 11,893.80 12,775.00 1,316.87 706.03 610.95 Pass - Major Risk 12-05 - 12-05ALl PB1-12-05ALl PB1 11,893.80 12,775.00 1,316.87 706.10 610.88 Pass -Major Risk 12-28-12-28-12-28 11,125.00 12,075.00 691.11 596.38 141.26 Pass - Major Risk 12 -28 -12 -28A -12-28A 10,910.03 12,000.00 655.85 220.93 438.40 Pass - Major Risk 12-32 - 12-32 - 12-32 13,908.74 12,525.00 741.65 432.16 333.63 Pass - Major Risk 322/2018 3.33.41PM Page 3 of 4 COMPASS 5000.1 Build 810 re"s BP iH4.by Anticollision Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Project: PBU TVD Reference: Reference Site: 01 MD Reference: Site Error: O.00usft North Reference: Reference Well: 01-36 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore PLAN 01-36 Database: Reference Design: 01-36 WP11A Offset ND Reference: Well 01-36 01-36 PLAN @ 86.00usft (P272 PLAN) 01-36 PLAN @ 86.00usft (P272 PLAN) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum BA ER F�UGHES GE company Reference Depths are relative to 01-36 PLAN @ 86.00usft (P272 Coordinates are relative to: 01-36 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK Central Mendian is 150° 0'0.000 W ° Grid Convergence at Surface is: 1.51° 1 Ladder Plot + 01-04,01-04B4O1-04BVo -1E• 01-04,01-04,01-04V2 �- 01-05,01-05PB7,01-05PB1 V2 -E- 01-05,01-056,01-05BVll $ 01-05,01-05,01-05V3 $ 01-07,01-07A,01-07AV1 $ 01-07,01-07APB1,01-07AP61 V1 $ 01-07,01-07,01-07V5 ->� 01-06,01-08APB1,01-0eAPB1 V14 MeasU6ii&pmn(2500 usftlin) -� 01-28,01-28,01-28V1 -)<- 01-29,01-29,01-29V7 $ 01-30,Plan0130a,0130awpD2V1 $ 01-30,01-30,01-30V1 t 01-31,01-31,0131 V1 �E- 0134,0134,01-34V1 -dr• 01-34,0134A,0134AV1 -� 03-16,03-16,03-16V13 -9- 0316,03-16A,03-16AV5 -j- 12-05,12-05AUP131, 12-05AUPB1 V0 $ 12-28,12-28A,12-2BAV3 $ 12-28,12-28,12-28V1 12-32,12-32,12-32V3 ♦• 01-06,01-06,01-06V1 $ 01-06,01-06A,01-06AV1 $ 01-09,01-09A,01-09AV1 ♦- 01-09,01-09,01-09V2 $ 12-02,12-02,12-02 VB 3222018 3:33:41PM Page 4 of 4 COMPASS 5000.1 Build 81D W x Lj 1ti Q 0 (ni/usn 0p9) y p5'p n�e St %��o Po ^o ASA 0 88o i` g�o Utgl lgzNg a 8�+9 Q2ogyo �oDON000e 8 'o 9i'o «m'1 oo�oo �i ' ;QSNr:' ---------------- mmmmg mnm^.o--m-mmm ]ooAm� ��Qe�NN rn�m�rory S oon-- o o o 00088SeSSoeSSSS koo�00000000dgry�o�000N0000 pe88SSSSSSSSSS8888S888S888 .-rm mo .��om oeoceoovooe .388 m.o.�$$�3SSe�E.m mernm`�4,K �Yiv'q o`S. _r'N Qr'N_�uuii � o r�m ma��i�a�i�vB��g rim�bm� ^"�. ^^tel Ft ^,•R?^^4444 49444 ' ZSS$o8o8SE�'8.."d "d.m �F'ae�me`Sv ."•, 3Sm '. �.0�0'488.ommm nm mmmmg mmmw �o$oof'f•r F3 F3�rr��riyrrr�r.r.r.r.^' EBoSSa$888SSSSSe« S$$q'e,$eS -oa "r.^„3SSo��=a,m mmme;mmmmmm �$�oo'imr�a'_`rir�i m m m m m mmmmmm mm m."' -a m' iso$ ne�N�N cd2v rne$:^fie ov6 p 08, g s' o S ��i�Z3gsg $ aaaSaaa �000000 �888888Y3 LL88$$$$$ 8 (uyusn 009) 41daQ jeaivap omL 44 I b Fr �zmm ��i�Z3gsg $ aaaSaaa �000000 �888888Y3 LL88$$$$$ 8 (uyusn 009) 41daQ jeaivap omL 44 I El �xE g e �o8m�:m�ev��ommme:��mamaoa MUM %%%%�sw8eose000a%essggggo �mm�m0000e000m��e�ae000voo o$o$$Soeoo88899929 �oo�R�SS�mSe�Nmmao.o R��Se'oA �eo�m�HeoNm�mm�.^�Rr'4gFem'^em rvrmmmR��me...mmmmmm e%m%°'e%8,m- oM22me B. P8P mA gzs mmm M;vvv- - m......mmmm �mvm�nnmwo�o$oPv�arvnnnnnn 7 z �5 OL 0 i Y Y'ai;sg;; B�R:=RR R5 s'a�aesRas s�ses'�sfss R4..RRRb.2 •911111♦ „ S ssssss°s ase SddBRBcag¢ ssssssaeee DO Projwe PBU Site: 01 Well: 01.36 Wellbore: PIAN 0146 Plan: 0146 W P11A Plus 600: MD (01.362PLAN 01.36) Nam'.pq:rlc Tri KKN MM'. 1)3 M rex R b0 agF5] ooa w �ixi Baan axBw WELLS0RE DETAIL$: PLAN 01-36 REF %NCEIWM.TIM 01-36 Coadmb(.£ Rala— Wall0"6. True NOM VaT IPD Re ,e , 0IW6 N@WO&st(P2]2PLAN Parent WHlbw9: No wellbore data is avail s:aru lvsi Relerenw SMloaox oroEl Tle on MD: 47.00 M-Wq 6 Orya.Reiwauo 013 MAN@ 660oOmYIP2]2 PUN cOkO.., bxmoe W., C -.z . Easting (300 usNin) 21$ s o WGHES a 4f aRnuarry 5940600 0 01-29 01.2 4 1 5940500 01-08A o°� l� o 01.08 wo300 g c s94osoo 6940000 o 5940000 5939700 aO2 o 5839700 M g0 �N 5939400 0 O pp FO y $0 01-09 5939400 5939100 `SOQ O $ O1 -26A 00 03-16A 01-02APB1 0 00 9p 01-09A 5839100 ^pp o o m 5938800 014OIA - O �o Oi-34A p0 O O b'p 01-26 5938800 593850o g){02 - ,pO 5938500 p0 O m 0 M1" O y 59]9200 d 9 ppp bOp 2 5936200 8593708 01-30 �2d 1� O o,p�1P m 593]900-- O� O w' -05 0 -03-24B u 0 Z 5937600 5937600 Z gO C 593]300 5937300 5937000 01-36 WP11A Plus 500ft MID app p S9J]000 110 03-24 03-16 m c 936700 01.11 °j a 59]6]00 5936400 12-28A 5836100 9 03-32B 5936100 `90 '92 O 5936100 12-28 908 01-05B 505800 p 03-24A n 5935900 pry 1$A- AL1 01-38"IiA Plus 5000 MD mm 505500 - Bo 01-36 WP11A 5935 Wo O o 12-32 03-19 5935300 l - - b 12-g5AL1PBi _ 59]s200 8 8 o oe v o e e v o e e v o$ e v o Easling (NO usNin) v e 31-W PLAN 0 86.00ue: (P272 PLAN) by North America - ALASKA - BP PBU 01 01-36 PLAN 01-36 01-36 WP11A Plus 500ft MD AOGCC Offset Well Report 22 March, 2018 BA ER � I UGHES a GE company b BP BER P Anticollision Report UGHES cc romoam Company: North America - ALASKA - SP Project: PBU Reference Site: 01 Site Error: 0.00usft Reference Well: 01-36 Well Error: O.00usft Reference Wellbore PLAN 01-36 Reference Design: 01-36 WP11A Plus 500 MD Local Ca -ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 01-36 01-36 PLAN @ 86.00usft (P272 PLAN) 01-36 PLAN @ 86.00usft (P272 PLAN) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCP1 Offset Datum Reference 01-36 WP11A Plus 500ft MD Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic Survey Tool Program Date 3/22/2018 From To (usft) (usft) Sunmy, (Wellbore) Tool Name 47.00 1,300.00 01-36 WP11A Plus 500ft MD (PLAN 01-36 GVD-GC-SS 1,300.00 3,780.0001-36 WP11A Plus 500ft MD (PLAN O1-36 MWD 1,300.00 3,760.00 01-36 WP11A Plus 500ft MD (PLAN 01-36 MWD+IFR+MS-WOCA 3,760.00 9,935.00 01-36 WP11A Plus 500ft MD (PLAN 01-36 MWD 3,760.00 9,935.0001-36 WP11A Plus 500ft MD (PLAN 01-36 MWD+IFR+MS-WOCA 9,935.00 14,496.3001-36 WP11A Plus 500ft MD (PLAN 01-36 MWD 9,935.00 14,496.3501-36 WP11A Plus 500ft MD (PLAN 01-36 MWD+IFR+MS-WOCA Summary Site Name Offset Well - Wellbore - Design O1 01-05 - 01-05 - 01-05 01-05 - 01-058 - 01-05B 01-05 - 01-05PB1 - 01-Oi 01-06 - 01-06 - 01-06 01-06 - 01-08A- 01-06A 01-07 - 01-07 - 01-07 01-07 - 01-07A - 01-07A 01-07 - 01-07APB1 -01-07AP81 01-28 - 01-28 - 01-28 01-28 - 01-28A- 01-28A 01-36 - PLAN 01-36 - 01-36 WP11A 03-24-03-24A - 03-24A 12 Description Gyrotlata gyro single shots MWD - Standard MWD + IFR + Multi Station W/O Crustal MWD - Standard MWD + IFR + Mufti Station W/O Crustal MWD - Standard MWD + IFR + Multi Station W/O Crustal Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 411.54 400.00 91.98 13,939.74 14,296.00 82.86 411.54 400.00 91.98 1,093.85 1,075.00 56.59 1,100.69 1,075.00 56.78 1,518.59 1,475.00 159.60 1,518,59 1,475.00 159.60 1,518.59 1,475.00 159.60 1,656.77 1,600+00 191.19 1,656.77 1,600.00 191.19 3,750.00 3,750.00 0.00 12,184.83 13,125.00 198.91 322/2018 4:10:44PM Page 2 of 36 COMPASS 5000.1 Build 810 ■19 17■ E20 16■ •21 32■ 15■ ■22 33M 14M ■ 23 13■ ■24 12. ■ 25 •35 11• • 26 180 SEC 5 S C 3 ■ 7 •28 ■ 29 a 81 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD27. ■30 ss BASIS OF LOCATION IS DRILL SITE 1 MONUMENTS 1A Q 1B. I BASIS OF ELEVATION IS BPXA MLLW DATUM. ■31 SEC 00. 8 6; SEC 5 ROW _ N i Pp - __-i PSt pOGK a o- SIO DATE OF SURVEY: MARCH 13, 2018. M34 .��,�p N ■10 4 '• ', pp/�. 11 q PROJECT DlAl 0 DRILL SITE 1 ■ 2 S7C 1 SEC .n._ 8 ■ 3 VICINITY MAP NTS ■ 4 5 01-36 LEGEND: ■ 6 -� AS -STAKED CONDUCTOR ■ EXISTING CONDUCTOR ■ 7 •28 ■ 29 a 81 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD27. ■30 2. BASIS OF LOCATION IS DRILL SITE 1 MONUMENTS 1A Q 1B. 3. BASIS OF ELEVATION IS BPXA MLLW DATUM. ■31 4. GEODETIC POSITIONS ARE NAD27. 5. DRILL SITE 1 AVERAGE SCALE FACTOR IS: 0.9999443. 9 6. DATE OF SURVEY: MARCH 13, 2018. M34 7. REFERENCE FIELD BOOK: NSIS-08 PGS. 14-23. ■10 GRAPHIC SCALE 0 150 300 600 ( IN FEET ) 1 inch = 300 ft. LOCATED WITHIN PROTRACTED SECTION 8, T. 10 N., R. 15 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC SECTION PAD CELLAR BASE NO. COORDINATES COORDINATES POSITION(DMS)POSITION(O.DD) OFFSETS ELEVATION BOX EL. FLANGE EL. 01-36 Y -5,940,290.98'N--1.927.43 70'14'27.373"• 70.2409370'• 4,646''FSL 39.0' - N/A N/A X= 698,768.14. E= 1,149.59 148'23'40.773". 148.3946592' 3,840'. FEL Bcscss by bell"� 3 1716 F aNc: DS1 01 . R n. EOA DS -1 �,F• oa - SCAa: AS -STAKED CONDUCTOR LOCATION MW 03 7 la, Ol Fat nro ON as ov 1'=3Da' WELL 01-36 1 OF 1 No. oAs acwsw a. c,N II I II I -62p I I 76 111112i 32 I I 0 15 W. co *So 33 ! Enter/Exit I Feed Enter/Exit i 300' — DS01-36 Grassroots Parker Rig 272 Location Layout Parking Bull Rail 07 .29 t **MUSTER AREA** BRM & Enviro Vac 4*t Ni I1AN34 -. /I 175' m 230' I , i - WELL PRODUCER WELL ■ or L] DATE: 7/26/2013 INJECTOR A BLAST ZONE SCALE : 1"= 275' MAP DATE :2012 PBU - DS1 WELL SLOT W/CONDUCTOR g 016368.xd to w 2 Sign -In Trailer Y.2 13 Flowbak 0 m 4 O Cuttings Boz� N ' O Primary Rig Entrance #�o 00 r Cement Silos 300' — DS01-36 Grassroots Parker Rig 272 Location Layout Parking Bull Rail 07 .29 t **MUSTER AREA** BRM & Enviro Vac 4*t Ni I1AN34 -. /I 175' m 230' I , i - WELL PRODUCER WELL ■ or L] DATE: 7/26/2013 INJECTOR A BLAST ZONE SCALE : 1"= 275' MAP DATE :2012 PBU - DS1 WELL SLOT W/CONDUCTOR g 016368.xd H F Weight: 3,200 LBS 1 I 1 CAMERON 3-1/e' w itAN6m YV9w GIE NLL 4 3-1/e• w nexun Nnwuc art wuE }1/C w rvx xog CEIIAR M10 91:11 NE1D a1NICIN4ngN IRE iCR NfM CPP ONLY ! NE REO GN PFRAIOR'S WaAE1f19S IfNE LP. 13 5/8 S ww 1! 5/9' nwef 1W u s/r w rv2cm evnon 5 13tH 51LOL 13 5/9' w i{MO[ lOP 15 s/e' w ft.Ncm mann 5/ 13snuot9 SOlmtx 13 5/9' w i1.N1aD 10Y It• w n/2I¢o moon 11- SPOOL A5lop IiV2HD 1W 11'r m w fINICFO BOIIOY G I /.4 y tl'w Fl w 6012 BOP STACK (DRAFT Sr tll PR SFAL NEtOEn ro 1XE mf10Y Of M 0.0Nm5 xerF OY. 1RR£ MQABIF 51eBR SFIL NFll eu ru w r 5N wI u iC M LOM r Gta1e: {I! 011nti ((ifi a' 2) t! 3/e' w evrmn 111( il/21Gt 19' 0 IfON4N SFI1-0-atlN )ra SNS.a (t u) r w sm. anal a1ml Inch oven rlenz I.t-s/e- w s5nlx Iyr t! -5/e• w snwom rro ss-s/e' w swan conal WI a .. 13 5/r w M W12 Cgfl£ BpP 13 5/e' w eNCfn 1 13 5/N' w IIA110fD 0 i N/ 3-1/2' IW1WL I N/ 11• emslpf aalel6 C1N4: 15 s/e' w SRVpm 1pp 1! N ( (2J 2) ! $ 1C 1' W 9p(ipy / w 5�E drOEls MRL 1)IF: 2-I/Ir w I -1/t6' w x M 3-1/9'lr w 0.5A }I/N' w nw® MNNw un vi55 3-1/e• w fuxa� xroNv.93: u1c wrf: 9NI 13 5 5/r w i W ror m12 51n]F em 13 5/e• w STAan W 13 3/9' w i1e114fn moa 8.3.17 L.0 Loepp, Victoria T (DOA) From: Sperry, Nathan <Nathan.Sperry@bp.com> Sent: Wednesday, April 25, 2018 11:13 AM To: Loepp, Victoria T (DOA) Cc: Lastufka, Joseph N Subject: RE: PBU 01-36(PTD 218-044) MPSP Victoria, I apologize for the confusion. 2473 psi is correct. The number on the 10-401 was a typo. Please let me know if you have any additional questions. Regards, Nathan Sperry Drilling Engineer C:(907)268-8416 0:(907)564-4258 From: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> Sent: Wednesday, April 25, 2018 10:12 AM To: Sperry, Nathan <Nathan.Sperry@bp.com> Cc: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Subject: PBU 01-36(PTD 218-044) MPSP Nathan, Three MPSPs are listed in this PTD: 1. 2536 psig on 10-401 form 2. 2354 psig in the cover letter 3. 2473 psig in the production interval table Please clarify. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loeop(Qalaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended Loepp, Victoria T (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Wednesday, April 25, 2018 10:04 AM To: Loepp, Victoria T (DOA) Cc: Gorham, Bradley M; Sperry, Nathan Subject: RE: Email please Victoria, In general, there is always a risk on a Rotary Sidetrack that there may be integrity issues that cause us to reevaluate or possibly suspend operations. Since the next well on the schedule is a sidetrack this may occur. In the event we are unable to drill as planned, the next well that we would prefer to go to is 01-36, a grassroots well due to the fact that the other sidetrack 07-20C is not prepped for the rig. Thank you, Joe Lastufka SIM Specialist Cell: (907) 227-8496 1 Office: (907) 564-4091 -------r-�------------------------------------------------- Subsurface & Wells L'Lvrnn4'.r, Nara7F^uac BP Exploration Alaska 1900 E. Benson Blvd. I Room: 778C I Anchorage, AK From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.gov) Sent: Wednesday, April 25, 2018 9:37 AM To: Lastufka, Joseph N <Joseph. Lastufka @ bp.com> Subject: Email please Send me an email addressing why the change in rig schedule and the acceleration of PBU 01-36. Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loeop(c)alaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria Loeoo@alaska aov Davies, Stephen F (DOA) From: Sperry, Nathan <Nathan.Sperry@bp.com> Sent: Wednesday, April 4, 2018 11:54 AM To: Davies, Stephen F (DOA) Cc: Lastufka, Joseph N Subject: RE: PBU 01-36 (PTD 218-044) - Question Hi Steve, No, there are no plans to hydraulically fracture 01-36. Regards, Nathan Sperry Drilling Engineer C: (907) 268-8416 O: (907) 564-4258 From: Davies, Stephen F (DOA) [mailto:steve.davies@alaska.gov] Sent: Wednesday, April 4, 2018 11:48 AM To: Sperry, Nathan <Nathan.Sperry@bp.com> Cc: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Subject: PBU 01-36 (PTD 218-044) - Question Nathan, Are hydraulic fracturing operations planned for the PBU 01-36 well? Thanks, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.aov. TRANSMITTAL LETTER CHECKLIST WELL NAME: I C'( �) /-31 PTD: JDevelopment —Service Exploratory _ Stratigra�p%hiic Test —Non -Conventional FIELD: POOL: ltieaGcm e- �f / Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. API No. SO - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50-_- _) from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 5/2013 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: P$UDHQE_sAY_iJl7JT9L-3¢-_ ____. Program .QED____ Well bore seg ❑ PTD#:2180440 Company 13,P -EXPLORATION (ALASKA) INC. Initial Ciasslfype DEV / PEND GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven, gas conforms to A831,05.030(i.1.A),(LZA-D) NA 1 Permit fee attached - - - - - - - - - - - - _ NA... 2 Lease number appropriate.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ Surf Loc &.Top Prod Int lie in ADL0028329; Portion of Productive Interval lies in ADL0028328; 3 Unique well name and number ... _ _ _ _ _ _ _ Yes TD lies in ADL0028331. 4 .Well located in.a defined pool___ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341E 5 Well located proper distance from drilling unit boundary. . .... . .. . . . ... . . . Yes _ _ CO 341 F. Rule 2:. There shall be no restrictions as to well. spacing. except that. no pay shall be _ 6 Well located proper distance from other wells . . . . . . . . . .. . ..... . ...... Yes opened in a well closer than 500 feet to. the boundary of the affected. area. Planned well conforms to CO 7 Sufficient acreage available in. drilling unit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes 341F,. Rule 2. 8 If deviated, is wellbore plat included _ _ _ _ _ _ _ _ Yes 9 Operator only affected party.... _ _ _ - - - - Yes - 10 Operator has. appropriate bond in force _ _ _ _ _ _ _ ... Yes Appr Date 11 Permit can be issued without conservation order. _ _ _ _ _ . Yes _ 12 Permit can be issued without administrative approval ... _ _ _ _ Yes SFD 4/4/2018 13 Can permit be approved before 15 -day wait_ _ _ ..... .. .... Yes 14 Well located within area and. strata authorized by Injection Order # (put 10# in. comments) (For. NA 15 All wells. within 1/4. mile area of review identified (For service well only). _ _ _ _ _ _ _ _ ..NA ........ 16 Pre -produced injector: duration of pre production less then 3 months (For service wall. only) _ _ NA 18 Conductor string provided .. _ ............. . . . . ----- ----------- Yes _ _ _ _ _ _ _ 80' conductor set Engineering 19 Surface casing protects all. known USDWs . ...................... Yes Surface casing set to 3757' MD 20 CMT. vol adequate to ciroulate.on conductor & surf csg _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ . 221516. excess cement 21 CMT vol adequate to tie-in long string to surf csg_ _ _ _ _ _ _ _ _ _ _ _ _ No. TOC is 8332' MD_ 22 CMT. will cover all known productive horizons. _ _ _ Yes _ _ _ _ Productive interval will be completed with cemented production liner and perforated 23 Casing designs adequate for C, T, B &. permafrost_ .. _ _ Yes 24 Adequate tankage or reserve pit _ Yes Rig has steel tanks; all waste to approved disposal wells 25 If a re -drill, has a 10-403 for abandonment been approved _ _ _ _ _ NA 26 Adequate wellbore separation proposed. _ _ _ Yes _ _ Anti -collision analysis failures 01-05B-SI@Surf; 03-24&03-24A-abd;03-24BSI@surf. 27 Jf,divertar required, does it meet regulations _ _ _ _ _ Yes _ _ _ _ _ _ Diverter meets regulations; flow paddle waived <1000 drilling per20AAC25.0330)_ Appr Date 28 Drilling fluid program schematic & equip list adequate_ _ _ _ .. _ Yes Max formation pressure is 3351 psig(7.34 ppg.EMW ); will drill w/ 8,7-1.1,0 ppg EMW VTL 4/25/2018 29 BOPEs,. do they meet regulation _ _ _ _ _ _ _ _ _ _ _ _ _ YeS... _ _ _ _ ... ..... ... _ .. 30 BOPE_press rating appropriate; test to.(put prig in comments)_ _ _ _ _ _ _ _ _ _ _ _ Yes _ MPSP is 2473 psig; will test BOPS to 3500.psig...... 31 Choke manifold complies w/API. RP -53 (May 84). _ _ _ _ _ _ _ _ _ Yes 32 Work will occur without operation shutdown ... . ........... ... _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ .. _ _ _ _ 33 Is presence of H2S gas probable _ ... Yes H2$ measures required . . ........... 34 Mechanical.condition of wells within AOR verified (For service well only) _ ......... _ NA . . . . . ........................... . . . . . . . ........... 35 Permit can be issued w/o hydrogen sulfide measures _ _ _ _ _ _ _ .. No. .. _ DS 01 wells are H2S-bearing, H2S measures.are required.... _ Geology 36 Data presented on potential overpressure zones _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ Planned mud weights appear adequate to control the operator's forecast of estimated pore pressures._ _ Appr Date 37 Seismic analysis of shallow gas zones ....... _ _ _ _ _ NA _ Should higher. pore_ pressures be encountered, BP has immediate access to nearby fluid.midng facilities.. SFD 4/4/2018 38 Seabed condition survey (if off -shore) _ ........ _ _ _ NA 39 Contact name/phone for weekly progress reports [exploratory only] ______ _ _ _ _ _ _ _ NA Geologic Engineering P is Commissioner: Date: Commission r: Date om o r Date ovs ¢(4l Igo r4„4- �z 4 q1 'S I,,'