Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout218-116DATA SUBMITTAL COMPLIANCE REPORT
4/29/2019
Permit to Drill 2181160 Well Name/No. PRUDHOE BAY UNIT P -04A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-22180-01-00
MD
13602
TVD 9016 Completion Date 1/10/2019
Completion Status 1-0I1
Current Status 1 -OIL UIC No
REQUIRED INFORMATION
Mud Log No V
Samples No ✓
Directional Survey Yes VIZ
DATA
DATA
INFORMATION
-
List of Logs Obtained:
MWD/GR/RES
(from Master Well Data/Logs)
Well Log Information:
Log/
Electr
Data
Digital
Dataset Log Log
Run Interval OH I
Type
Med/Frmt
Number Name Scale Media
No Start Stop CH
Received
Comments
ED
C
30239 Digital Data
11304 13602
1/14/2019
Electronic Data Set, Filename: P-
04A_LW D_ FINAL_ FIELD_COMPOSITE_03Jan2
019_BHI_CTK.Ias
ED
C
30239 Digital Data
1/14/2019
Electronic File: P-
04A—GR _ Res_ 03JAN2019_MD_FINAL_FIELD_B
HI_CTK.cgm
ED
C
30239 Digital Data
1/14/2019
Electronic File: P-
04A_GR_Res _ 03JAN2019_TVDSS_FINAL_FIEL
D_BHI_CTK.cgm
ED
C
30239 Digital Data
1/14/2019
Electronic File: P-
D4A_GR_Res _ 03JAN2019_MD_FINAL_FIELD_B
HI_CTK.pdf
ED
C
30239 Digital Data
1/14/2019
Electronic File: P-
04A_GR_Res _ 03JAN2019_TVDSS_FINAL_FIEL
D_BHI_CTK.pdf
ED
C
30239 Digital Data
1/14/2019
Electronic File: P -04A Final Field Surveys.csv
ED
C
30239 Digital Data
1/14/2019
Electronic File: P•04A Final Field Surveys.xlsx
ED
C
30239 Digital Data
1/14/2019
Electronic File: P -04A Final Survey Report.txt
ED
C
30239 Digital Data
1/14/2019
Electronic File: P -04A Final Surveys.pdf
ED
C
30239 Digital Data
1/14/2019
Electronic File: P-04A_25_tapescan_BHI_CTK.txt
ED
C
30239 Digital Data
1/14/2019
Electronic File: P-04A_5_tapescan_BHI_CTK.txt
ED
C
30239 Digital Data
1/14/2019
Electronic File: P-04A_output.tap
ED
C
30239 Digital Data
1/14/2019
Electronic File: P -
04A_ GR_ Res_ 03JAN2019_MD_FINAL_FIELD_B
HI CTK.tif
AOGCC Pagel of'2 Monday, April 29, 2019
DATA SUBMITTAL COMPLIANCE REPORT
412 912 01 9
Permit to Drill 2181160 Well Name/No. PRUDHOE BAY UNIT P -04A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-22180.01.00
MD 13602 TVD 9016 Completion Date 1/10/2019 Completion Status 1-0I1- Current Status 1-0I1 UIC No
ED C 30239 Digital Data 1/14/2019 Electronic File: P-
04A_GR Res_ 03JAN2019_TVDSS_FINAL_FIEL
D_BHI _CTK.tif
Log C 30239 Log Header Scans 0 0 2181160 PRUDHOE BAY UNIT P -04A LOG
HEADERS
Well Cores/Samples Information:
Name
INFORMATION RECEIVED�.�
Completion Report ./ 1
Production Test Informatio0 YID/ NA
Geologic Markers/Tops
COMPLIANCE HISTORY
Completion Date: 1/10/2019
Release Date: 10/10/2018
Description
Comments:
Complier
Sample
Interval Set
Start Stop Sent Received Number Comments
Directional / Inclination Data Y& Mud Logs, Image Files, Digital Data Y / Core Chips Y /
Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files Y0,/ Core Photographs Y / 1�A
Daily Operations Summary Cuttings Samples Y / n,v I Laboratory Analyses Y / A
Date
Comments
Date:
AOGCC Page oft Monday, April 29, 2019
STATE OF ALASKA
\LASKA OIL AND GAS CONSERVATION COMMIS' N
WELL jMPLETION OR RECOMPLETION REPO, AND LOG
HEGE-AVER
F 75 1, 7 oma
Is Well Status: Oil 21 ' Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
1b. Well Class:
20AAC 25.105 201= 25.110
GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One
Development 21 Explofab ye ❑
-..-.^
Service ❑ Stratigraphic Test ❑
2. Operator Name:
6, Date Comp., Susp., or Abend.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
1/10/2019
218-116 '
3. Address:
T Date Spudded:
15. API Number:
P.O. Box 196612 Anchorage, AK 99519-6612
12/24/2018
50-029-22180.01-00 "
4a. Location of Well (Governmental Section):
8. Date TD Reached:
16. Well Name and Number:
1/2/2019
PBU P -04A -
9 Ref Elevations KB 91 64
17. Field/Pool(s):
Surface: 2564' FSL, 2001' FWL, Sec. 31, T1 IN, R1 3E, UM
Top of Productive Interval: 140 FSL, 2917' FWL, Sec. 32, T11 N, R13E, UM
GL 53.80 BF 53.80
PRUDHOE BAY, PRUDHOE OIL
10. Plug Back Depth(MD/TVD):
18. Property Designation:
Total Depth. 21' FSL, 1480 FVL, Sec. 32, T1 IN, R1 3E, UM
' 13548' / 9009' I
ADL 028288
41b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11. Total Depth (MD/TVD):
19. DNR Approval Number:
Surface: x- 631284 . y- 5947292 Zone - ASP 4
• 13602-19015-
88-016
TPI: x- 637256 y- 5944974 Zone - ASP 4
12. SSSV Depth (MD/TVD):
20 Thickness of Permafrost MD/fVD:
Total Depth: x- 635821 y- 5944829 Zone - ASP 4
None
1970'
5. Directional or Inclination Survey: Yes 0 (attached) No ❑
13. Water Depth, if Offshore:
21. Re-chill/Lateral Top Wndow
MD/TVD:
Submit electronic and printed information per 20 AAC 25.050
N/A (11 MSL)
11519'/ 8905'
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma my, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
MWO/GR/RES
23. CASING, LINER AND CEMENTING RECORD
CASING
I WT. PER I
FT.
GRADE
SETTING DEPTH MD
SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
AMOUNT
PULLED
TOP
BOTTOM
TOP
BOTTOM
20"
42'
122'
42'
122'
30"
260 ax Arctic Set (Approx.)
10-3/4"
45.5#
W -m
41'
2734'"
41'
2691'
13-1/2"
2622 cu 8 Permafrost
7-5/8"
29.7#
W-95HS
38'
11519' -
38'
8905'
9-7/8"
1742 cu it Class'G'
5-1/2"
17#
13Cr80
11284'
11519' •
8738'
8905'
6-3/4"
170 cu 8 Class'G'
-1/2"x3-1/4"
9.3#/6.6#
13CM5
11261'
13602'
8721'
9016'
4-1/4"
91 sx Class'G'
x2-7/8"
/6.5#
24. Open to production or injection? Yes El , No ❑
25. TUBING RECORD
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
GRADE DEPTH SET (MD) PACKER SET (MD/TV
4-1/2" 12.6# 13Cr80 11288' 11242'/ 8708'
2" Gun Diameter, 6 sof 1/9/2019
12410'- 12586' 9038'- 9021'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
12765'- 12793' 9017' - 9017' COMPLETION
Was hydraulic fracturing used during completion? Yes ❑ No 2
Per 20 AAC 25.283 (i)(2) attach electronic and printed
information
12855' - 12955' 9017' - 9014'
13100' - 13315' 9009' - 9007' DA-rE
13350'- 13460' 9008'- 9005' ! O
VE721FI£D
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
2500' Freeze Protect w/ 35 Bble Diesel
27, PRODUCTION TEST
Date First Production: January 23, 2019
Method of Operator, (Flrwnng, gas IA, etc.): Gas U8
Dale of Test: 125/19
Hours Tested:
Production for
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Choke Sive
Gas -Oil Ratio:
12
Test Period --w
78
219
579
91
3025
Flow Tubing 240
Press
Casino Press:
1900
Calculated
24 Hour Rate y
Oil -Bbl:
145
Gas -MCF:
438
Water -Bbl:
1158
Oil Gravity - API(cam:
WA
Form 10-407 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only
28. CORE DATA I Conventional Corals) Yes ❑ No 0 Sidewall Cores Yes ❑ No 0
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071,
29, GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MID
TVD
Permafrost - Top
Well Tested? Yes ❑ No 0
Permafrost - Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
12108'
9007'
separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Shublik
11539'
8918'
Sadlerochit - Zone 4B
12108'
9007'
Formation at total depth:
Zone 4B
12108'
9007'
31. List of Attachments: Summary of Daily Drilling Reports, Survey, Cement Report, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070,
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Hyatt, Trevor
Authorized Title: SIM Spe lis Contact Email Tmvor.Hyatt@bp.com
Authorized Signature: D - Z h I Contact Phone: +1 907 564 4627
INSTRUCTIONS
General: This form is designed for su mitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item Ia. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (fop of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15, The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the date pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals coretl and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 5/2017 Submit ORIGINAL Only
VALLFEAD=
CIVY
ACTUATOR=
REFLOG BKR MVYD'GWRES ON 01/03/19
INITIAL KB. ELE
91.64'
BF. ELEV =
53.8'
KOP=
1700'
Max Angle =
97' @ 12501'
Datum AD=
11501'
Datum ND=
8800'SS
9, H-40,
=19.124'
= 9.950'
Minimum ID = 2.31"@11274'
2 -718"X -NIPPLE IN LTP
ITOPOF3-1/2'X31/4"X2-7/8'LNR 11 11270' 1
4-1/2" TBG, 12.69, NT-13CR TDS,
0152 b0f. ID = 3.958'
3-12' LNR, 9.3#, 13CR-85 STL,
.0087 bpf, D = 2.992"
DELTA V*VS700Kw2 PA PPTAGS
5-12' LNR, 17#, NT13-CR .0232 bpf, D = 4.892-
3-114' LNR, 6.6#, 13CR-86 TCI,
.0079 bpf, D = 2.85'
1 11288' I
D = 2.441'
SA Y NOTES: WELL ANGLE> 70° @ 11600'. MAX
P -04A DL, 3.6'@11630'—CHROMETBG&LNR"
GAS LFT MANDRELS
ST
PBWORATION SLMTMRY
TVD
REFLOG BKR MVYD'GWRES ON 01/03/19
TYPE
ANGLE AT TOP PERF: 94' 0 12410'
Note: Refer to Roductim DB for historical pert data
SIZE
SPF
INTERVAL
Opn/Sgz
DATE SOZ
2
6
12410-12586
O
01/09/19
2
6
12765 - 12793
O
01/09/19
2
6
12655-12955
O
01/09/19
2
6
13100 - 13315
O
01/09/19
2
6
13350 - 13460
O
01/09/19
D = 2.441'
SA Y NOTES: WELL ANGLE> 70° @ 11600'. MAX
P -04A DL, 3.6'@11630'—CHROMETBG&LNR"
GAS LFT MANDRELS
ST
MD
TVD
DEV
TYPE
VLV
LATCH PORT
DOTE
5
3110
3010
37
CA
DOHS
BK 16
0121119
4
6765
5456
50
CA
SO
BK 20
01/21/19
3
9225
7163
41
CA
OW
BK 0
10/02/18
2
10593
8211
39
CA
• DMY
B< 0
10/17/13
1
11204
8680
44
CA
DMY
B< 0
10/02/18
' STA 9 2 = MY HAS EXTENDED PACKING
PKR SWS NP. D = 3.813'
17-518- X 4-12- TW HBBP PKR D= 4.0"
5-1/2' MLLOUT EXTENSION. D = 4.865'
45KB LTPw/2' PUP& PISA
1-1/2' PKR SWS NP, D = 3.1
11274' —12-7/8" X NP, D = 2.31'
11275' 4-12'PKR SWN NP, BEHIND
MILLED D=3.80'(04/27/00) CT LNR
11284' 7-5/8"X5-12'HYDLNRw/T®KSLV,D=7
11288' 4-12' WLEG, D=3.958'
11286' ELMD TT LOGGED 07/12/91
11281' 3-12'XNP,1D=2.812'
11AM' 3-1/2'X3-3/16'_0=2788'
MILLOUT WWDOW (P -04A) 11519'-1152T
13-1/4' X 2-7/8' XO. D = 2.377" 1
PRUDHOE BAY LUT
WELL: PL04A
PERMIT No: 218-116
AR N0: 50-029-22180-01
SEC 31, TI I N, R13E, 2564' FSL & 2001' FVYL
DATE REV BY COMYBJTS
DATE REV BY 00NIVENTS
07/12191 ALU2 INITIAL COMPLETION
0123/19 GJB/JM)SETLTPw/PMA&X-NP(O12211
06/03/00 NORDIC 1 SIDETRACKCOMPLETION
02/05/19 JN./JM1D TBG TALLY DEPTH EDITS
01/10/19 N-CDR2 CTD ST (P -04A)
01/15/19 .MRD DRLG HO CORRECTIONS
0123/19 TWJMT ODEFMWLAPFROVAL
BP Exploration (Alaska)
0123/19 JRGJMJ GLV C/O (0121/19)
North America - ALASKA- BP
Operation Summary Report
Common Well Name; P-04 AFE No
Event Type. RE-ENTER- ONSHORE (RON) Start Date: 12/15/2018 End Date: 1/3/2019 X3 -0197J -C: (2,351,407.00 )
Project: PBU Site: P
Page 1 of 30 1
Rig Name/No.: CDR -2
Spud Date/Time; 6/11/1991 12:00:OOAM
Rig Release:
Rig Contractor NABORS ALASKA DRILLING INC.
BACKWARDS.
11-.30
BPUOI: USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
RIGU
P r
Date From - To
Him
Task
Code NPT Total Depth
Phase
Description of Operations
(hr)
(Usft)
12/15/2018 11:00 - 1800
7.00
RIGU
P
PRE
ACCEPT RIG AT 11:00.
BEGIN SAFE OUT CHECKLISTS AND RIGGING
INSPECT.
UP.
MAKE UP INJECTOR TO WELL.
14:30
- 1500
SPOT AUXILIARY EQUIPMENT.
RIGU
P
PRE
INSTALL QUICK CONNECT TEST FITTINGS.
1500
HOOK UP STEAM LINES AND INTERCONNECT
0.50
RIGU
P
PRE
CONDUCT PJSM FOR REVERSE
LINES.
PREP ADAPTER FLANGE FOR TREE.
18.00 - 00'.00
6.00
RIGU
P
PRE
PERFORM LTT BETWEEN MASTER VALVE
SPOT AND HOOKUP MEOH.
AND SWAB TO 3500#. GOOD TEST
LINE UP VALVES FOR REVERSE
NIPPLE DOWN TREE CAP. WORK ON
CIRCULATING.
15:30
- 19:00
GETTING MPD LINE HOOKED UP.
RIGU
P
PRE
RECONFIGURE VALVES GOING TO TIGER
LAND BOP STACK. NIPPLE UP STACK
TANK TO MATCH HAZOP DRAWING
LOADER SPOTTING CONTAINMENT AND ANY
_ANCILLARY EQUIPMENT
12/16/2018 00:00 - 02:00
2.00
RIGU
P
PRE
FINISH NIPPLE UP. SECURE STACK
3500 PSI, GOOD.
1900
- 00:00
5.00
RIGU
'TURNBUCKLES.
02:00 - 05:30
3.50
RIGU
P
PRE
INSPECT TUGGERS. RUN ROPE THROUGH
SLACK BACK TO REEL.
INJECTOR.
REVERSE CIRCULATE FRESH WATER INTO
PULL GRAPPLE CABLE THROUGH. PJSM,
REEL.
REVIEW PROCEDURE AND DISCUSS ROLES
AND RESPONSIBILITIES.
JNSTALLGRAPPLE. PULLTEST
05:30 - 11:30
6.00
RIGU
P
PRE
PULL CT ACROSS PIPE SHED AND INTO
REPLACEDO-RING. PUMPSLACKBACK
INJECTOR.
FOR BULKHEAD.
INSTALL HORSEHEAD.
RIG UP BIG BOY COMPRESSOR TO BLOW
REPLACE HOSE ON INJECTOR THAT WAS
INNER REEL DOWN.
LEAKING.
INSTALL HOSE IN REEL FOR PUMPING SLACK
Printed 1/28/2019 11:24:33AM **Ali depths reported in Drillers Depths"
BACKWARDS.
11-.30
- 1430
3.00
RIGU
P r
PRE
VALVE CHECKLISTAND RIG CHECKS WITH
ONCOMING CREW.
ENERGIZE BOPACCUMULATOR UNIT AND
INSPECT.
MAKE UP INJECTOR TO WELL.
14:30
- 1500
0.50
RIGU
P
PRE
INSTALL QUICK CONNECT TEST FITTINGS.
1500
- 15:30
0.50
RIGU
P
PRE
CONDUCT PJSM FOR REVERSE
CIRCULATING.
SPOT AND HOOKUP MEOH.
LINE UP VALVES FOR REVERSE
CIRCULATING.
15:30
- 19:00
3.50
RIGU
P
PRE
RECONFIGURE VALVES GOING TO TIGER
TANK TO MATCH HAZOP DRAWING
PRESSURE TEST TIGER TANK LINE TO 250 /
3500 PSI, GOOD.
1900
- 00:00
5.00
RIGU
P
PRE
PJSM FOR FILLING REELAND PUMPING
SLACK BACK TO REEL.
REVERSE CIRCULATE FRESH WATER INTO
REEL.
LEAK DEVELOPED ON RISER. BLOW DOWN
AND INSPECT O-RING.
REPLACEDO-RING. PUMPSLACKBACK
FOR BULKHEAD.
RIG UP BIG BOY COMPRESSOR TO BLOW
INNER REEL DOWN.
Printed 1/28/2019 11:24:33AM **Ali depths reported in Drillers Depths"
Common Well Name: P-04
Event Type. RE-ENTER- ONSHORE (RON)
Project: PBU
North America -ALASKA - BP
Operation Summary Report
Start Date: 12/15/2018 End Date: 1/3/2019
Site: P
AFE No
(2,351,407.00)
Page 2 of 30
Rig Contractor. NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB @91.64usft (above
Mean Sea Level)
Date From - To
Hrs
Task
Code NPT Total Depth
Phase
Description of Operations
_
lint
(usft)
12/17/2018 00:00
- 01:00
1.00
RIGU
P
PRE
BRING AIR ONLINE. FLOOR SUMPS NOT
DRAINING. CREW MOBILIZED VACUUM
SYSTEM. FRESHWATER TO CONTAINMENT
IN CELLAR. CALL SPILL HOTLINE. CALL
SUPERINTENDENT. FLOW LINE FROZE.
HEAT TRACE NOT WORKING
VERIFY TEST JOINT LENGTHS. TORQUE
CONNECTIONS TO 1000# WHILE CLEANING
01:00
- 0400
3.00
RIGU
P
PRE
_UP.
CONTINUE BLOWING REEL DOWN. BLEED
PRESSURE OFF. BREAK LINE OFF. TE -LINE
FOR BULKHEAD. RACK BACK INJECTOR.
0400
- 0530
1.50
RIGU
P
PRE
BREAK OFF DOWN TO TEST RISERS.
INSTALL TEST CAP WITH JOINT GREASED
-UP.
05.30
- 0830
3.00
RIGU
P
PRE
'CHECK BOPADAPTER FLANGE BOLTS FOR
PROPER TORQUE. WITH SWEENEY.
MAKE UP PRESSURE BULKHEAD AND J -BOX
INSIDE REEL.
MAKE UP INNER REEL HARDLINE.
08.30
- 1100
2.50
RIGU
P
PRE
PJSM FOR CUTTING CT.
HOOK UP HYDRAULIC CUTTER AND CUT 280'
OF CT.
11:00
- 14:00
3.00
RIGU
P r
PRE
INSTALL CT CONNECTOR, PULL TEST TO 50K,
GOOD.
COMPLETE VALVE CHECKLIST SHEET.
LINE UP TO FILL REEL FORWARD.
FILL REEL FORWARD.
1400
- 1500
1.00
RIGU
P
PRE
PRESSURE TEST CT CONNECTOR AND
PRESSURE BULKHEAD T04,700 PSI, SLIGHT
LEAK OBSERVED.
PERFORM LOBO ON REELAND TIGHTEN
BULKHEAD PACKING.
PRESSURE TESTT04,70_0 PSI, GOOD.
1500
- 16:00
1.00
RIGU
P
PRE
RIG UP LITTLE JERKS FOR CALIBRATION.
INSTALL CORRECT SIZE DIES.
TORQUE UP STINGER AND NOZZLE WITH
LITTLE JERKS AND TEST TORQUE VALUES.
MAKE UP INJECTOR TO WELL.
16:00
- 1630
0.50
RIGU
P
PRE
TEST QTS TO 250 / 3,500 PSI, GOOD.
PUMP SLACK FORWARD AT 4,100 PSI 13.65
BPM. CABLE IS HEARD MOVING.
16:30
- 18:00
1.50
RIGU
P
PRE
MOVE INJECTOR OFF WELL.
_ _
_
_, _
CALIBRATE LITTLE JERKS, GOOD
18.00
- 2000
2.00
RIGU
P
PRE
TEST WIRE. CONTINUITYGOOD. MEG TEST
LOW. POSSIBLE MOISTURE
CUT 20' COIL / 20'E -LINE. RETEST. SAME
ISSUE.
2000
- 2230
2.50
RIGU
P
PRE
PREP FOR SHELL TEST.
WORKON SHELLTESTTO MAKE SURE WE
ARE READY FOR A.M TEST PUMP ISSUES.
_
CALL MECHANIC.
22:30
- 0000
1.50
RIGU
P
PRE
CALLAND DISCUSS E -LINE ISSUES WITH
ETL.
CUT MORE COIL / E -LINE.
Printed 1/282019 11:24:33AM **All depths reported in Drillers Depths"
Common Well Name. P-04
Event Type: RE-ENTER- ONSHORE (RON)
Project: PBU
North America - ALASKA - BP Page 3 of 30
Operation Summary Report
ATE No
Start Date: 12/15/2018 End Date: 1/3/2019 X3 -0197J -C'. (2,351,407.00 )
Site: P
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum', KB @91.64usft (above Mean Sea Level)
Date From - To
Hra
Task Code NPT Total Depth
Phase
Description of Operations
(hr)
(us@)
12/18/2018 00:00
- 02:30
2.50
RIGU P
PRE
CONTINUE TO TROUBLESHOOT E -LINE.
OPEN JUNCTION BOX. GOOD TEST ON
E -LINE.
NARROW DOWN TO COLLECTOR OR
COLLECTOR PIGTAIL.
MECHANIC TORE DOWN TEST PUMP. SCALE
PARTICLES HOLDING VALVES OFF SEAT.
_
SERVICE TEST PUMP. _
0230
- 0330
1.00
RIGU P
PRE
PJSM, REVIEW CROSSCHECK.
STAGE UP PRESSURE TO ADJUST POPOFF
AT 5500#. 8000# BURST DISK INSTALLED.
PERFORM A PASSING 5100# SHELL TEST.
BLOW DOWN TEST PUMP.
03'.30
- 0600
2.50
RIGU P
PRE
INSTALL COILTUBING CONNECTOR
PULL TESTED TO 50K
•
BHI INSTALL LOC. TEST LINE FROM J -BOX
TO UOC. TESTED GOOD.
INSTALLTESTSUB. PRESSURETESTUOC
AND CTC TO -4500#, GOOD.
0600
- 0800
2.00
BOPSUR P
PRE
MOVE CART BACK
PREP FOR BOP TEST #1.
CONDUCT PJSM FOR BOP TESTING.
DRILLER AND WSL REVIEW PRESSURE
XCHECK VERIFICATION.
SIMOPS: REPLACE COLLECTOR THAT WAS
THE SOURCE OF THE ELINE TROUBLE
EARLIER.
08:00
- 12:00
4.00
BOPSUR N
PRE
TEST BOPS TO 25015000 PSI AS PER BP AND
AOGCC REGULATIONS.
TEST IS WITNESSED BYAOGCC REP JEFF
JONES.
TEST 1: BLINDS FAIL, CYCLEAND REPEAT,
FAILAGAIN. FLUID IS OBSERVED PASSING
BLINDS.
CONTINUE ON WITH TEST 1.
SIMOPS: CONTINUE WITH GAS ALARM
TESTING, ALL GAS ALARMS PASS.
PRESSURE STILL BLEEDING OFF, SUSPECT
LEAKING PAST MASTER AND TWC.
1200
- 14:00
2.00
BOPSUR N
PRE
CALL OUT GREASE CREW.
TEST NEW COLLECTOR, GOOD.
MOVE FLUID AROUND PITS, CHECK PVT LO/
HI LEVELALARMS ON ALL THE PITS.
GREASE CREW COMES OUT AND CLOSES
SSV, SERVICES MASTER VALVE.
14'.00
- 16'.30
2.50
BOPSUR N
PRE
RE -START TEST #1 TO 250 / 5000 PSI. VALVE
B4 1S LEAKING BYAT HIGH PRESSURE,
GREASE AND CYCLE, RE -TEST. GET GOOD
TEST ON B1, BL1. FAIL / PASS ON R1. FAIL
ON 84 AND BLINDS.
1830
- 1800
1.50
BOPSUR N
PRE
TEST #2 ANNULAR (2-3/8"), TIW #2, B3, B2,
BLi PASS 250 / 3500 PSI.
18:00
- 20:00
2.00
BOPSUR N
PRE
TEST #3 TO 250 / 5000 PSI. UPPER 2 3/8"
PIPE/SLIP RAMS, TIW #2, BL2, T2 AND C 15.
HIGH PRESSURE LEAK OFF TROUBLE SHOOT
BY ISOLATION.
REFLUSH TEST LINESAND RETEST.
Printed 1/28/2019 11:24:33AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name. P-04 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 1 2/1 512 01 8 Eno Date: 1/3/2019 X3 -0197J -C: (2,351,407.00 )
Project PBU Site: P
Page 4 of 30
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To
Him
Task Code NPT Total Depth
Phase
Description of Operations
(hr)(usft)
_
_..._
20:00
- 23:00
3.00
BOPSUR N
PRE
RE -START TEST #3 TO 250/5000 PSI. UPPER
2 3/8" PIPE/SLIP RAMS, TIW #2, BL2, T2 AND C
15.
ISOLATE LEAK PATHS ONE AT A TIME DOUBLE
BLOCKING -PRESSURE STILL FALLING.
CLOSE LOWER 2 3/8" PIPE/SLIP
RAMS -PRESSURE STILL FALLING.
TEST TEST EQUIPMENT -GOOD
DISCUSS ISSUES WITH TOWN WHILE
WAITING ON GREASE CREW TO
ARRIVE -SUSPECT PRESSURE BLEEDING
. PAST SSV _
2300
- 2330
0.50
BOPSUR N
PRE
HOLD TOOLBOX TALK WITH GREASE CREW
AND RIG CREW.
CLOSE SWAB VALVE
OPEN MASTER VALVE
OPEN SSV -OBSERVED 200 PSI TRAPPED
'PRESSURE WHEN SSV OPENED.
GREASE SWAB, SSV, MPD VALVES AND
MASTER.
23:30
- 00:00
0.50
BOPSUR N
PRE
HOLD TOOLBOX TALK PRESSURE TEST TO
250 / 5000 PSI. AGAINST MASTER, LOWER 2
3/8" PIPE/SLIP RAMS, 71 -PRESSURE STILL
BLEEDING OFF.
NOTE -STATE INSPECTOR HOURED OUT WILL
BE BACK IN 8 HOURS. _
12119/2018 00:00
- 01:00
1.00
BOPSUR N
PRE
DISCUSS PLAN FORWARD WITH TOWN
TEAM.
HOLD TOOL BOX TALK WITH CREW
PRESSURE TEST AGAINST TWC, LOWER2
3/8" PIPEISLIP RAMS, T1 TO 5000
PSI -PRESSURE STILL BLEEDING OFF AT 500
PSI IN 10 MINUTES
PRESSURE TEST AGAINST TWC, LOWER2
3/8" PIPEISLIP RAMS, T1 TO 3500
PSI -PRESSURE STILL BLEEDING OFF 150 PSI
IN 10 MINUTES
DISCUSS RESULTS WITH TOWN TEAM AFTER
REACHING AGREED UPON STOP POINT.
01:00
- 0230
1.50
BOPSUR N
PRE
HOLD TOOLBOX TALK WITH CREW
PRESSURE TEST VOID BETWEEN SSVAND
SWAB VALVE USING THE MPD LINE TO
250/3500 PSI.GOOD TEST
DISCUSS RESULTS AND PLAN FORWARD
WITH TOWN TEAM
02'.30
- 0800
5.50
BOPSUR N
PRE
HOLD TOOLBOX TALK WITH CREW
REMOVE TEST JOINT
DE ENERGIZE AND LOCK OUT
ACCUMULATOR
VAC OUT BOP STACK TO REMOVE FLUID.
CHANGE OUT BLIND RAMS ELEMENTS.
08:00
- 10:00
2.00
BOPSUR N
PRE
CHANGE OUT CHOKE HCR.
10:00
- 12:30
2.50
BOPSUR N
PRE
REPLACEMENT COMPLETED.
ENERGIZE ACCUMULATOR.
COMPLETE VALVE CHECKLIST SHEET.
CONDUCT SHELL TEST ON BOPS, SWAB,
CHOKE AND KILL HCCRS TO 25015000 PSI,
GOOD
1230
- 18:00
5.50
BOPSUR N
PRE
WAITONAOGCCINSPECTORTOARRIVE-
SHIM REEL.
Printer! 1/28/2019 11:24:33AM "All depths reported in Drillers Depths"
2300
- 0000
North America - ALASKA - Blo
Pape 5 of 30
N
PRE
Operation Summary Report
Common Well Name: P-04
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Stan Date: 12/15/2018 End Date. 1/3/2019
X3 -0197J -C'. (2.351,407.00 )
Project: PBU
Site: P
Rig Name/No.: CDR -2
Spud Date/Time: 6/11/1991 12:00:OOAM
Rig Release.
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI'. USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
TEST CHOKE VALVE C11 AGAINST C15
12/20/2018 00:00
Date From - To Him
Task
Code NPT Total Depth Phase
Description of Operations
(hr) _
TESTCHOKE MANIFOLD TO 25015000 PSI
(usft)
1800 - 1900 1.00
BOPSUR
N PRE
TEST SOPS TO 250 / 5000 PSI AS PER BP AND
WHILE WAITING ON VALVE CREW TO ARRIVE
AOGCC REGULATIONS.
TEST IS WITNESSED BYAOGCC REP MATT
HERRERA.
TEST CHOKE VALVE C9,C7 AND C10 AGAINST
TEST 1: BLINDS FAIL, CYCLE AND REPEAT,
FAILAGAIN. FLUID IS OBSERVED PASSING
C15 -FOUND TEST HOSE QUICK CONNECT TO
BLINDS.
1900 - 19:30 0.50
BOPSUR
N PRE
TEST #2: ANNULAR (2-3/8"), TIW #1 , 83, B2,
BE LEAKING. -NO TEST -REPAIR HOSE
01:30
02:00
PASS 250 / 3500 PSI.
19.30 - 2000 0.50
BOPSUR
N PRE
TEST #3 TO 250/5000 PSI. UPPER 2 318"
PIPE/SLIP RAMS, TIW #1 , B3, B2. -TO OBTAIN
HOLD TOOL BOX TALK WITH GREASE CREW
5000 PSI TEST ON TIW #1, 83, B2 _
2000 - 21:00 1.00
BOPSUR
N PRE
TEST #4 TO 250 / 5000 PSI. UPPER 2 3/8"
OPEN MASTER, OPEN SSV, OPEN MPD LINE
PIPEISLIP RAMS, TIW #2, B2 AND C 15. R2
FAILED -ISOLATED WITH B2
21:00 - 23:00 2.00
BOPSUR
N PRE
TEST #5 TO 25015000 PSI. UPPER 2 3/8"
PIPE/SLIP RAMS, TIW #2, BL2 R2 AND B4. B4
APPEARS TO BE LEAKING, FUNCTION,
SERVICES TREE VALVES
GREASE AND RETEST UPPER 2 3/8"
PIPE/SLIP RAMS, TIW #2, 81 AND B4 AND R2
CLOSE TR EE VALVES.
02:00
NOT HOLDING.84 FAIL.
1.50
BOPSUR
N
NOTE: WENT BACK TO LAST GOOD TEST
FLUSH LINES AND TEST AGAINST SWAB
ALLIGNMENT, NOT ABLE TO OBTAIN PASSING
TEST. SUSPECT PRODUCTION TREE VALVES
NOT HOLDING.
3/8" PIPE/SLIP RAMS, TIW #1 , B3, B2 -NOT
CALL VALVE CREW TO COME SERVICE TREE
VALVES.
ABLE TO MAINTAIN A GOOD TEST SUSPECT
NOTE: AOGCC REP MATT HERRERA TIMED
OUT AND LEFT LOCATION WITH PERMISSION
FLUID PASSING BY PRODUCTION TREE
TO CARRY ON WITH TESTING ONCE
TROUBLE SHOOTING IS DONE WITHOUT
0330
- 0400
0.50
WITNESS
2300
- 0000
1.00
BOPSUR
N
PRE
TEST CHOKE MANIFOLD TO 250/5000 PSI
WHILE WAITING ON VALVE CREW TO ARRIVE
ON LOCATION.
TEST CHOKE VALVE C11 AGAINST C15
12/20/2018 00:00
- 01:30
1.50
BOPSUR
N
PRE
TESTCHOKE MANIFOLD TO 25015000 PSI
WHILE WAITING ON VALVE CREW TO ARRIVE
ON LOCATION.
TEST CHOKE VALVE C9,C7 AND C10 AGAINST
C15 -FOUND TEST HOSE QUICK CONNECT TO
BE LEAKING. -NO TEST -REPAIR HOSE
01:30
02:00
0.50
BOPSUR
N
PRE
GREASE PRODUCTION TREE VALVES
HOLD TOOL BOX TALK WITH GREASE CREW
OPEN MASTER, OPEN SSV, OPEN MPD LINE
TO BLEED ANY TRAPPED PRESSURE, OPEN
SWAB.
SERVICES TREE VALVES
CLOSE TR EE VALVES.
02:00
- 03:30
1.50
BOPSUR
N
PRE
FLUSH LINES AND TEST AGAINST SWAB
VALVE TO 250 / 5000 PSI. AGAINST UPPER 2
3/8" PIPE/SLIP RAMS, TIW #1 , B3, B2 -NOT
ABLE TO MAINTAIN A GOOD TEST SUSPECT
FLUID PASSING BY PRODUCTION TREE
VALVES.
0330
- 0400
0.50
BOPSUR
N
PRE
DISCUSS OPTIONS AND PLAN FORWARD
WITH CTD SUPT AND ETL
Printed 1/28/2019 11 24:33AM "All depths reported in Drillers Depths"
Common Well Name: P-04
Event Type: RE -ENTER -ONSHORE (RON)
Project: PBU
Rio Name/No.: CDR -2
North America - ALASKA - BP
Operation Summary Report
Start Date. 12/15/2018 End Date: 1/3/2019
Site: P
Spud Daterrime: 6/11/1991 12:00:OOAM
Active datum: KB (091.64usft (above Mean Sea Level)
Dale From -To Him Task
(hr)
04:00 - 06:30 2.50 BOPSUR
Code NPT Total Depth
(usft)
N
06:30 - 08:30 2.00 BOPSUR N
08.30 - 1200'. 3.50 BOPSUR N
12'.00 16:00 4.00 BOPSUR N
i
16:00 - 19:30 3.50 BOPSUR N
Page 6 of 30
AFE No
X3 -0197J -C'. (2,351,407.00 )
BPUOI: USA00001646
Phase Description of Operations
.—
PRE RIG UP TO PUMP PREMIUM GREASE INTO
MASTER, SWAB AND SSV, EXPEDITE
ADDITIONAL DRUM OF PREMIUM GREASE TO
RIG SITE.
DISCUSS PLAN FORWARD WITH NABORS
SUPERINTENDENT, PREPARE LOCK OUTAND
PRE JOB FOR TESTING BOPS WITH 3500 PSI
TRAPPED PRESSURE BETWEEN SWAB AND
SSV.PUMP PREMIUM GREASE INTO MASTER,
SWAB_ANDSSV
PRE PJSM FOR NEW SHELL TEST.
PUT 3500 PSI ON THE WELL IN BETWEEN
THE SWAB AND SSV. PRESSURE BLEEDING
OFF, REPLACE 2 VALVES AND TRV AGAIN.
STILL BLEEDING OFF, FLUID IS OBSERVED
PASSING THE SWAB.
PRE REGREASE SWAB VALVE. PRESSURE UP
BETWEEN SWABAND CLOSED SSV,
MASTER.
PRESSURE IS BLEEDING OFF.
PRESSURE UP BETWEEN SWAB AND TWC.
PRESSURE IS BLEEDING OFF, SAME RATE AS
BEFORE.
CLOSE MASTER VALVE AND SEE IF LINE
FLATTENS OUT. STILL BLEEDING OFF.
PRE DISCUSS PLAN FORWARD WITH ODE, CTD
SUPT AND ETL.
DECISION IS MADE TO USE BOP TEST PLUG
THAT SITS IN A SPOOL ON THE BOTTOM OF
THE BOPS.
CHANGE OUT SEALS ON BLIND RAMS.
PRE PJSM THEN BREAKAPART STACK TO INSTALL
BOP TEST SPOOL.
BREAK FLANGE AND REMOVE BOPS FROM
PRODUCTION TREE
INSTALL TESTING SPOOL WITH PRE LOADED
TEST PLUG ON TOP OF PRODUCTION TREE
RE INSTALL BOP ONTO TESTING SPOOL..
GREASE CHOKE VALVES AND B VALVE
_ OFFLINE
t
19:30 - 20:00 0.50 BOPSUR N PRE FUNCTION BLINDS, FLUID PACK TEST LINES.
20:00 - 21:45 1.75 BOPSUR N IR HOLD PJSM AND SHELL TEST BOPS TO
250/5000 PSI -FAIL LEAKING THROUGH
BLINDS.
RIG UP TEST JOINT WITH CAP AND RE
ATTEMPT SHELL TEST TO 250/5000 PSI
Printed 1/28/2019 11 24 **All depths reported in Drillers Depths"
AGAINST TEST CAP, R2, TIW 2, TEST PLUG,
TP2, C15 AND BL 2 -GOOD TEST. CALL MATT
HERRERA AOGCC REPAND RECIEVE
PERMISSION TO START BOP TEST.
21.45 - 22.15 050 SOPSUR P
PRE
TEST BOPS TO 250/ 5000 PSI AS PER BP AND
AOGCC REGULATIONS.
TEST IS WITNESSED BY AOGCC REP MATT
HERRERA.
TEST #1: ANNULAR (2-3/8"), TIW #2, B3, B2,
250/3500 PSI. -PASS
22:15 - 2300 075 BOPSUR P
PRE
TEST#2: UPR23/8 PIPE/SLIP RAMS, TIW#2,
33,132, 250 / 5000 PSI. -PASS
23:00 - 23:30 0.50 BOPSUR P
PRE
TEST #3 UPR 2 3/8 PIPE/SLIP RAMS, TIW #2,
BL2, R2, 250 / 5000 PSI. -PASS
Printed 1/28/2019 11 24 **All depths reported in Drillers Depths"
Common Well Name: P-04
Event Type: RE-ENTER- ONSHORE(RON)
Project: PBU
North America - ALASKA - BP Page 7 of 30
Operation Summary Report
Start Date: 12/15/2018
Site: P
End Date: 1/3/2019
AFE No
K3 -0197J -C:(2,351,407.00)
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB @91.64usft (above
Mean Sea Level)
0445
- 0515
0.50
Date From - To
Him
Task
Code NPT Total Depth
Phase
Description of Operations
0.75
BOPSUR
(hr)
PRE
_ (usft)
2330
- 0000
0.50
BOPSUR
P
PRE
TEST #4 UPR 23/8 PIPE/SLIP RAMS, TIW#2,
3.00
BOPSUR
P
PRE
PJSM THEN RIG UP FOR TESTING IRV AND
C16, C11, _B1 250 / 5000 PSI. -PASS
12/21/2018 00:00
- 0030
0.50
BOPSUR
P
PRE
TEST BOPS TO 250 / 5000 PSI AS PER BPAND
INSTALL NOZZLE, MAKE UP RISER TO WELL.
AOGCC REGULATIONS.
PUMP I REEL VOLUME FORWARD.
09:00
TEST IS WITNESSED BYAOGCC REP MATT
2.00
BOPSUR
P
PRE
CREW CHANGE.
HERRERA.
RIG CHECKS AND VALVE CHECKLIST WITH
TEST #5 TEST 2 3/8 X 3 1/2 VBR, C7, Ce, C10,
NEW CREW.
TB2 TO 250/5000 PSI -PASS
0030
- 01:00
0.50
BOPSUR
P
PRE
TEST #6 TEST LOWER 2 3/8 PIPE SLIP RAMS,
PRESSURE TEST INNER REEL VALVE,
-05, CS C8, TVI -PASS
01:00
- 01:30
0.50
BOPSUR
P
PRE
TEST #7SUPER AND MANUAL CHOKES.
1.00
BOPSUR
N
PRE
VALVE R3 IS SEEN LEAKING FROM THE FACE
2500 PSI DRAWDOWN -CHOKE IN GOOD
FLANGE.
OPERATION
01:30
- 0200
0.50
BOPSUR
P
PRE
ACCUMULATOR DRAWDOWN TEST
RESULT.
CLOSING PRESSURE 2375, TIME TO GAIN 200
CHANGE OUT VALVE R3.
PSI 17 SECONDS, FULL PRESSURE 64
SECONDS. AVERAGE NITROGEN 10 BOTTLES
AT 2100 PSI.
GOOD TEST.
02:00
- 0230
0.50
BOPSUR
P
PRE
RIG UP TO TEST VARIABLES AND ANNULAR
WITH 3 1/2" PIPE -HAD TO REMOVE BOTTOM
OF TEST JOINT FOR SPACE OUTAGAINST
THE TEST PLUG
02:30
- 03:00
0.50
BOPSUR
P
PRE
TEST #6 ANNULAR WITH 31/2 PIPE, Cl, C4,
C6, TIW 2 TO 250/3500 PSI -PASS
OFFLINE TEST PVT SYSTEM AND ALARMS.
03:00
- 03:30
0.50
BOPSUR
P
PRE
TEST #9 VBRS WITH 3 1/2 PIPE Cl, C4, C6
TIW 2 TO 250/5000 PSI -PASS
0330
- 04:00
0.50
BOPSUR
P
PRE
TEST #10 C2, C3, B3, TO 250/5000 PSI -PASS
0400
- 0445
0.75
BOPSUR
P
PRE
TEST#11 84, BOTO 250/5000 PSI SUSPECT
-
CHECK VALVE LEAKING, ISOLATE AND TEST
Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths"
B4 TO 250/5000 PSI -PASS
0445
- 0515
0.50
BOPSUR
P
PRE
TEST#12 BL1A, R1 TO 250/5000 PSI -PASS
05:15
- 0600
0.75
BOPSUR
P
PRE
RIG DOWN TEST JOINTAND TEST
.EQUIPMENT _
06:00
- 0900
3.00
BOPSUR
P
PRE
PJSM THEN RIG UP FOR TESTING IRV AND
STRIPPER.
INSTALL NOZZLE, MAKE UP RISER TO WELL.
PUMP I REEL VOLUME FORWARD.
09:00
- 11:00
2.00
BOPSUR
P
PRE
CREW CHANGE.
RIG CHECKS AND VALVE CHECKLIST WITH
NEW CREW.
PJSM FOR PT INNER REEL VALVE.
PRESSURE TEST INNER REEL VALVE,
STRIPPER TO 250 / 3,500 PSI.
11.00
- 1200
1.00
BOPSUR
N
PRE
VALVE R3 IS SEEN LEAKING FROM THE FACE
FLANGE.
BLEED OFF PRESSURE AND TIGHTEN, SAME
RESULT.
CHANGE OUT VALVE R3.
Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths"
North America - ALASKA - Blo
Operation Summary Report
Common Well Name: P-04
BPUOI: USA00001646
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 12/15/2018
Project: PBU
Site: P
End Dale: 1/3/2019
AFE No
X3 -0197J -C (2,351,407 00 )
Page 8 of 30
Rig Contractor NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB C91.64usft (above Mean Sea Level)
BOPSUR N
Date From - To Him Task Code NPT Total Depth
Phase Description of Operations
(hr) just)
BOPSUR N
12:00 - 15:00 3.00 BOPSUR P
PRE LINE UP TO PRESSURE C9, C10 FROM
1.50
DOWNSTREAM SIDE.
PRESSURE 25013,500 PSI.
PRESSURE IS BLEEDING OFF, DRIP
OBSERVED FROM BEHIND C9, C10.
GREASEAND CYCLE THESE 2 VALVES, TRY
AGAIN.
STILL BLEEDING, ISOLATE IRVAND
STRIPPER AND TEST THOSE.
GOOD TEST TO 250 / 3500 PSI ON IRV AND
STRIPPER
1500 - 1945
4.75 BOPSUR N
19:45 - 20:45 1.00 BOPSUR P
20:45 - 21:45 1.00 BOPSUR P
21:45 - 2200 0.25 BOPSUR P
2200 - 0000 2.00 BOPSUR N
12/22/2018 00:00
- 01:00
1.00
BOPSUR N
01:00
- 01:30
0.50
BOPSUR N
01:30
- 03:00
1.50
BOPSUR P
03:00 - 04:00 1.00 BOPSUR N
VALVE C9 NOT HOLDING PRESSURE FROM
THE DOWNSTREAM SIDE.
PRE PJSM FOR CHANGING OUT BLIND RAM
SEALS.
PERFORM LEAK TIGHT TEST ON SWAB AND
SSV, GOOD.
CHANGE OUT SEALS ON BLIND RAM
BLOCKS, CHANGE OUT EQUALIZER VALVE
ON BLIND RAM OPERATORS..
PRE TEST BLINDS TO 250/5000 PSI -GOOD
PERFORM SHELL TEST TO TEST BLIND RAM
DOOR SEALS TO 250/5000 PSI -GOOD
PRE TEST BOPS TO 25015000 PSI AS PER BP AND
AOGCC REGULATIONS.
TEST IS WITNESSED BYAOGCC REP MATT
HERRERA.
TEST #14 BLINDS, B1, B2, B3 TO 250/5000
_ PSI -PASS _
PRE TEST # 15 B2, BLINDS, C9, C10, C16, C6, TP 1,
TP 2 250/5000 PSI -FAIL C9 LEAKING
SERVICE AND CYCLE C9, RESTEST 250/5000
PSI
1 PRE TEST #16 CHOKE TEST CHOKE AAND CHOKE
C
PRESSURE UP TO 5000 PSI HOLD, OPEN
CHOKES BLEED TO 2500 PSI AND
HOLD -GOOD TEST
PRE LINE UP TO PRESSURE C9, of 0 FROM
DOWNSTREAM SIDE.
FLUSH AND FILL LINES
PRESSURE 25013,500 PSI. DID NOT PASS
SIMOPS CREW CHANGE
SIM OPS RIG UP GREASE CREW TO GREASE
PRODUCTION TREE VALVES.
PRE RIG DOWN RISER AND FLANGE FROM TOP
OF ANNULAR WITH PJSM
REMOVE TEST PLUG FROM TESTING SPOOL.
PRE RIG UP RISER TO TOP OFANNULAR AND MU
SAME.
PRE PURGE AND FLUSH SURFACE LINES FOR
TESTING
LINE UP TO TEST BL1 TO 250/3500 PSI -PASS
LINE UP TO TEST T2 TO 250/3500 PSI -PASS
LINE UP TO TEST T1 TO 250/3500 PSI -PASS
NOTE RISER WAS TESTED WITH EACH OF
THE ABOVE TESTS
PRE LINE UP TO PRESSURE C9, of 0 FROM
DOWNSTREAM SIDE.
PRESSURE 25013,500 PSI. UNABLE TO MEET
PASSING CRITERIA
Printed 1/26/2019 11 24:33AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name. P-04 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date. 12/15/2018 Eno Date. 113/2019 X3 -0197J -C: (2,351,407.00 )
PBU Site: P
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To Hrs Task Code
(hr)
04:00 - 04:30 0.50 BOPSUR N
04:30 - 06:30 2.00 BOPSUR N
06:30
- 07:30
1.00
BOPSUR P
07:30
- 09:30
2.00
BOPSUR N
Rig Release:
NPT Total Depth Phase Description of Operations
(usft)
0930
- 1000
0.50
BOPSUR
P
10:00
- 12:30
2.50
BOPSUR
P
Page 9 of 30
PRE REBUILD VALVE C13
FLUSH/PURGE LINES
_ LINE UP FOR TEST OF VALVES C9 AND C10
PRE LINE UP TO PRESSURE C9, C10 C13 FROM
'DOWNSTREAM SIDE.
PRESSURE 250 / 3,500 PSLUNABLE TO MEET
PASSING CRITERIA.
TROUBLE SHOOT LEAK PATH.
REPLACE SEAT ON C13,
PRE PRESSURE UP ON DOWNSTREAM SIDE OF
C9, C10.
GOOD TEST.
BOP TESTING COMPLETE.
PRE DURING TESTING, C14 WAS PASSING FLUID.
PJSM THEN CHANGE OUT C14.
'TRY TO TEST C14, NOTABLE TO. SUSPECT
C13 AND CHOKE PASSING FLUID.
PJSM THEN CHANGE OUT C13.
TESTC13,C14AFTER CHANGEOUT,_ GOOD.
PRE RIG EVAC EXERCISE WITH MICAH'S CREW.
,ALL PERSONS MUSTER AND ACCOUNTED
FOR IN 3 MIN.
_ 'CONDUCTAAR.
PRE GREASE CHOKE AND FUNCTION.
INSTALL BHI FLOATS.
GREASE ALL CHOKE VALVES POST BOP
TEST.
RIG CHECKS AND VALVE CHECKLIST WITH
ONCOMING CREW.
12:30
- 14:00
1.50
BOPSUR
P
PRE
PRESSURE TEST UQC TO 250/4700 PSI,
GOOD.
PRESSURE TEST FLOATS TO 3,500 PSI,
GOOD.
14:00
- 1530
1.50
1 BOPSUR
P
PRE
MAKE UP INJECTOR TO WELL.
CHECK TREE BOLTS FOR TORQUE.
PUMP THROUGH MPD CHOKE AND VERIFY
PLC CONTROLLER IS WORKING.
15:30
- 16.00
0.50
BOPSUR
P
PRE
RIG EVAC EXERCISE WITH RICK ROY CREW.
ALL PERSONS MUSTER AND ACCOUNTED
FOR IN 4 MIN.
CONDUCTAAR.
1600
- 1800
2.00
WHSUR
P
PRE
GET NEW RKBS WITH NABORS CREWAND
VALVE SHOP CREW.
HOOK UP BPV LUBRICATOR AND PULLING
RODS.
_ HOOK UP HYDRAULICS. _
18.00
- 1930'.
1.50
WHSUR
P
PRE
HOLD PJSM WITH RIG CREWAND VALVE
SHOP CREW FOR TESTING LUBRICATOR AND
PULLING BPV.
WALK ALL LINES AND VERIFY VALVE
ALLIGNMENT
FLUSH LINES TO CLEAR AIR FOR TEST.
PRESSURE TEST VALVE LUBRICATOR TO
250/5000 PSI FOR 5 MINUTES EACH -GOOD
TEST.
Printed 1/28/2019 11:24.33AM **All depths reported in Drillers Depths"
Common Well Name: P-04
Event Type: RE-ENTER- ONSHORE(RON)
Project: PBU -
North America - ALASKA- BP
Operation Summary Report
Start Date'. 12/15/2018
Site: P
AFE No
End Date'. 1/3/2019 X3 -0197J -C (2,351 407 00 )
Page 10 of 30
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datumKB @91.64usft (above Mean Sea Level)
1.00
Date From - To Hos Task Code NPT Total Depth
Phase Description of Operations
(hr) (usft)
- 0030
19:30 - 2045 1.25 WHSUR P
PRE PULL TWC
HOLD PJSM
RIG DOWN TEST LINE, RIG UP LUBRICATOR
HYDRAULIC LINE.
OPEN MASTER VALVE
OPEN SSV
OPEN SWAB AND MONITOR FOR TRAPPED
PRESSURE -0 PSI
VERIFY LINE UP PER NABORS PROCEDURE
USING COMMAND AND CONTROL
CHECKLIST.
ENGAGE AND PULL TWC.
WELL ON SLIGHT VAC -ALLOW METHANOL TO
DRAIN.
CLOSE MASTER AND SWAB VALVE
NOTE: FUSABLE CAP INSTALLED AND HYD
_
FLUID DRAINED FOR SSV.
20:45 - 21:00 0.25 WHSUR P
PRE PERFORM LEAK TIGHT TEST TO 3500 PSI
BETWEEN MASTER AND SWAB -GOOD TEST
WITNESSED BY RIG MANAGER AND WSL.
21'.00 - 21:30 0.50
21:30 23:00 1.50
WHSUR P i PRE RIG DOWN LUBRICATOR
KILLW P
'HOLD PJSM
OPEN NEEDLE VALVE ON LUBRICATOR AND
VERIFY NO METHANOL PRESENT.
BREAK OTIS CAP AND PULL LUBRICATOR
WITH TWC.
LAY DOWN AND RIG DOWN LUBRICATOR.
_ BLOW DOWN LINE TO TIGER TANK.
PRE MAKE UP BHA#1 FOR BOTTOM KILL
OPERATION
HOLD PJSM WITH CREW.
MAKE UP STINGER, NOZZLE WITH FLOAT
INSTALL QUICK TEST CONNECTOR TO
LUBRICATOR
STAB INJECTOR
TEST QUICK TEST CONNECTOR AND
LUBRICATOR TO 3500 PSI LEAK TIGHT TEST.
GOOD TEST
PRE LOAD COIL TUBING WITH METHANOL AND
HEATED 1% KCL
PUMP 15 BBLS OF METHANOL FOLLOWED BY
HEATED 1% KCL TAKING RETURNS TO TIGER
TANK UNTIL METHANOL IS DETECTEDAT OUT
MICROMOTION. _
PRE LOAD COIL TUBING WITH METHANOLAND
HEATED 1% KCL 8.5 PPG
PUMP 15 BBLS OF METHANOL FOLLOWED BY
HEATED 1% KCL TAKING RETURNS TO TIGER
TANK UNTIL METHANOL IS DETECTEDAT OUT
MICROMOTION.
Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths"
23:00
- 00:00
1.00
KILLW P
12/23/2018
0000
- 0030
0.50
KILLW P
'HOLD PJSM
OPEN NEEDLE VALVE ON LUBRICATOR AND
VERIFY NO METHANOL PRESENT.
BREAK OTIS CAP AND PULL LUBRICATOR
WITH TWC.
LAY DOWN AND RIG DOWN LUBRICATOR.
_ BLOW DOWN LINE TO TIGER TANK.
PRE MAKE UP BHA#1 FOR BOTTOM KILL
OPERATION
HOLD PJSM WITH CREW.
MAKE UP STINGER, NOZZLE WITH FLOAT
INSTALL QUICK TEST CONNECTOR TO
LUBRICATOR
STAB INJECTOR
TEST QUICK TEST CONNECTOR AND
LUBRICATOR TO 3500 PSI LEAK TIGHT TEST.
GOOD TEST
PRE LOAD COIL TUBING WITH METHANOL AND
HEATED 1% KCL
PUMP 15 BBLS OF METHANOL FOLLOWED BY
HEATED 1% KCL TAKING RETURNS TO TIGER
TANK UNTIL METHANOL IS DETECTEDAT OUT
MICROMOTION. _
PRE LOAD COIL TUBING WITH METHANOLAND
HEATED 1% KCL 8.5 PPG
PUMP 15 BBLS OF METHANOL FOLLOWED BY
HEATED 1% KCL TAKING RETURNS TO TIGER
TANK UNTIL METHANOL IS DETECTEDAT OUT
MICROMOTION.
Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths"
Continued from day shift. T/1/0= 0/0/0 Post CDR2. Barriers MV & SV. Verified by
performing independent LTT. Macnical issues with truck. Job on hold. Job Continued on
111012019
1/11/2019
T/1/0=0/010 POST CDR2. Continued from 1110/2019. R/U CIW Lubricator 840 W/ 4" H
plug and tool. PT'd lubricator Low 300psi, High 3500psi. Set TWC # 296 @ 125 top of
window. Good set. R/D lubricator & swapped over to pulling tool & R/U lubricator. Torqued
Tree with no movement on any studs. PT'd Tree low 300psi, Hight 5000psi. (Passed).
Pulled TWC # 296 @ 125 top of window. Installed tree cap & PTd to 500psi. RDMO
1/11/2019
***Job Complete*** FWHP= 0/0/0
***WELL FOUND S/1 ON ARRIVAL***
DRIFTED TO DEVIATION @ 11,615' SLM w/ 2.51" CENT, AND 1.75" S-BLR.
RAN PDS JEWELRY LOG FROM 11,350' SLM TO SURFACE.
1/20/2019
***WSR CONTINUED ON 1/21/19***
T/I/0= Vac/Vac/Vac Temp= S/I Assist SSL (CTD) Pumped 14 bbis crude down TBG,
1/21/2019
***WSR Continued on 01-22-19***
***WSR CONTINUED FROM 1/20/19*** (ctd)
SET4-1/2" WHIDDON CATCHERAT 11245' SLM.
PULLED STA#4 BK-DGLV FROM 6765' MD
PULLED STA#5 BK-DGLV FROM 3110' MD
SET STA#5 BK-LGLV AT 3110' MD.
SET STA#4 BK-DGLV AT 6765' MD.
PULLED 4-1/2" WHIDDON CATCHER FROM 11245' SLM.
RAN DUMMY 3.70" 45 KB LNR TOP PKR, 2' SPACER PUP, DMY PTSA TO 11,270' MD.
(Unable to get full penetration)
RAN 4-1/2" BRUSH TO BRUSH LTP @ 11,270MD.
RAN DUMMY 3.70" 45 KB LNR TOP PKR, 2' SPACER PUP, DMY PTSA TO 11,270' MD.
(Unable to get full penetration)
RAN 4-1/2" BRUSH TO BRUSH LTP @ 11,270' MD WHILE PUMPING.
1/21/2019
***WSR CONTINUED ON 1/22119***
*"WSR CONTINUED FROM 1/21/19`** (ctd)
SUCCESSFUL DRIFT TO 11237' SLM W/ 3.70" LTP DRIFT,
SET 45 KS LNR TOP PACKER W/ 2' SPACER PUP, AND PTSA AT 11237' SLM. (TOP @
11261' MD)
LRS MIT -T TO 2160 PSI (PASS).
PULL 2-7/8" XX PLUG FROM LTP AT 11237' SLM. (11274' md)
1/22/2019
***WELL TURNED OVER TO DSO***
***WSR Continued from 01-21-19*** Temp= S/I Assist SSL MIT -T ***PASS*** @ 2311.
Max applied 2400, target 2160. Pumped 5 bbis crude down TBG to assist SSL. Pumped
4.92 bbis to reach test pressure. 1st 15 min lost 54 psi. 2nd 15 min lost 25 psi. Total loss
1/22/2019
of 79 psi. Bled back —1.9 bbis. Hang tags. FWHP's 290/0/0. SLB on well upon departure.
Printed 1/282019 11 24 33A *`All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 11 or 30
Operation Summary Report
Common Well Name. P-04
AFE No
Event Type: RE-ENTER-ONSHORE (RON)
Start Date: 12/15/2018 Eno Date. 113/2019
X3-0197J-C: (2,351 407.00 )
Project: PBU
Site: P
Rig Name/No.: CDR-2
Spud Date/Time: 6/11/1991 12:00 OOAM
Rig Release:
Rig Contractor NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB Q91.64usft (above Mean Sea Level)
Date From -To Him
Task Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
00:30 - 06:00 5.50
_
KILLW P 11.491 00 PRE
RIH FROM SURFACE TO 11491'
HOLD PJSM WITH RIG CREW-ALSO COVER
PRE SPUD SLIDE PACK WITH CREW
OPEN WELL TO CLOSED CHOKE-0 PSI ON
WELLHEAD
SET OPERATING PRESSURE ON CHOKE TO
MAINTAIN 100 PSI WELL HEAD PRESSURE.
RIH AT 50 FPM PUMPING AT 0.25 BPM WITH
HEATED I%KCL8.5 PPG UNTILPASSING
PERMAFROST AT 2300'.
NO WELL HEAD PRESSURE INCREASE
OBSERVED WHILE RIH AND PUMPING. FILL
DOWN BACK SIDE. APPROXIMATELY 5 BELS
TO FILL.
INCREASE RUNNING SPEED TO 80 FPM
CONTINUING TO HOLD 100 PSI ON CHOKE.
NOTE: PULL BACK TO SURFACE FROM 100'
TO RE CALIBRATE BHI DEPTH COUNTER.
STOP AGAIN AT 10000' TO FINISH
CALIBRATION.
NOTE: STOP AT 200 BBLS SHIPPED OUT TO
TIGER TANK AND CONFIRM WITH MANUAL
STRAP. TT SENSOR MATCHES MANUAL
:STRAP.
06.00 - 0740 167
KILLW P 11,491.00 PRE
LIGHT TAG ON WHIPSTOCK AT 11.491'
UNCORRECTED.
PICK UP 10' AND INCREASE PUMP RATE TO
BPM.
PUMPALL KCL WATER THEN SHUT DOWN.
HAVEN'T GOT A BOTTOMS UP YET SO S/I
WELLAT CHOKE WHILE TT IS EMPTIED OUT.
RESUME PUMPING A FULL B/U. _
07.40 - 08:20 0.67
KILLW P 0.00 PRE
AFTER e/U SUIT DOWN PUMP. PJSM AND
REVIEW NABORS PROCEDURE TO PURGE
ANY TRAPPED GAS OUT OF CT RISER.
HOOK UP BLEED HOSE FROM RISER OUT TO
TT, PUMP FLUID OUT TO TT.
UNHOOK HOSEAND PURGE WITH AIR FROM
RIG FLOOR.
08:20 - 10.30 2.17
KILLW P 11,491.00 PRE
CONTINUE CIRCULATING MUD TO NOZZLE.
AFTER MUDAROUND NOZZLE, START POOH.
AFTER MUD GETS TO SURFACE, BRING
RETURNS INSIDE, PURGE TIGER TANK LINE
WITH AIR.
FLOW CHECK WELL.
RETURN FLOW DIMINISHING SLOWLY. USE
16 OZ CONTAINER TO FINGERPRINT WELL.
1ST 16 OZ - 2.5 MIN TO FILL
2ND -5MIN
3RD- 15 MIN
FLOW HAS STOPPED AFTER 15 MORE MIN.
_
10 MIN FLOWCHECK IS GOOD. _
10:30 - 14:20 3.83
KILLW P 11,491.00 PRE
CONTINUE POOH.
TAG STRIPPER AND RUN BACK IN 500' TO
GET CORRECT DEPTH COEFFICIENT FOR
_
BHI.
14:20 - 15:30 1.17
KILLW P 11,491.00 PRE
TAG STRIPPER.
PJSM WITH NABORSAND BHI CREW FOR LID
BHA.
UD NOZZLE BHA.
MAKE UP TIW TO SAFETY JOINT.
Printed 1/282019 11 24 33A *`All depths reported in Drillers Depths"
Common Well Name. P-04
Event Type: RE-ENTER- ONSHORE(RON)
Project: PBU
North America - ALASKA - BP Page 12 of 301
Operation Summary Report
Start Date: 12/15/2018 E,d Date. 1/3/2019
Site:P --
Soud Date/Time: 6/11/1991 12:00:OOAM
AFE No
X3 -0197J -C (2,351407.00)
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI. USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To
Hrs
Task Code NPT Total Depth
Phase
Description of Operations
(hr)
Wait)
15:30 - 17:30
2.00
STWHIP P 11,491.00
WEXIT
PJSM THEN M/U BHA#2, WINDOW MILL.
WHILE PICKING UP BHA WALK THROUGH
SAFETY JOINT PROCEDURE WITH NEW
CREW MEMBERS.
MILLAND REAMER BOTH 3.80 GO, 3.79"
NO-GO _
17.30 - 2000
2.50
STWHIP P 11,491 00
WEXIT
RIH WITH BHA#2 TO 11390'
PERFORM GAMMA RAY TIE IN -10'
CORRECTION
CONTINUE TO RIH FROM 11 390'AND DRY TAG
WHIPSTOCK
2000 - 2030
0.50
STWHIP P 11,51900
WEXIT
CONTINUE RIH AND DRY TAG 11518.5'WITH
2.8K DOWN. _
20:30 - 00:00
3.50
STWHIP P 11,521.00
WEXIT
,MILL 3.80" WINDOW IN S-1/2"X75/8"DUAL
STRING PER BAKER REP FROM 11518.5'
- RATE: 2.85 BPM IN, 2.85 BPM OUT
- MUD WEIGHT: 8.6 PPG IN, 8.58 PPG OUT
-SEE MOTOR WORK AT 11518.5 SUSPECTED
CEMENT
-START MILLING WINDOWAT 11519.3'TO
11521.5
- DWOB: 0. 3.2KLBS
- CIRC PRESSURE:2480-2550 PSI _
12/24/2018 00:00 - 013:00
6.00
STWHIP P 11,526 50
WEXIT
MILL 3.80" WINDOW IN 5-1/2"X 7 5/8" DUAL
STRING PER BAKER REP
- RATE: 2.8 BPM IN, 2.8 BPM OUT
- MUD WEIGHT: 8.59 PPG IN, 8.54 PPG OUT
-SEE MOTOR WORK AT 11518.5 SUSPECTED
CEMENT
-START MILLING WINDOW AT 11521.5' TO
11526.5'
- DWOB: 3- 3.5KLBS
- CIRC PRESSURE:2480-2550 PSI
06:00 - 12:00
6.00
STWHIP P 11,526.50
WEXIT
MILL 3.80" WINDOW IN 5-1/2'X 7 5/8" DUAL
STRING PER BAKER REP FROM 11525.3' MD
TO 11526.9' MD
- RATE: 2.74 BPM IN, 2.73 BPM OUT
- MUD WEIGHT: 8.58 PPG IN, 8.54 PPG OUT
- DWOB: 3.4 - 3.8 KLBS
- CIRC PRESSURE: 2500 - 2650 PSI
- GETTING GOOD AMOUNT OF METAL
ACROSS SHAKER.
12:00 - 16:30
4.50
STWHIP P 11,529.60
WEXIT
MILL 3.80"WINDOW IN S-1/2"X75/8"DUAL
STRING PER BAKER REP FROM 11526.9' MD
TO 11529' BOW MD
- RATE: 2.76 BPM IN, 2.77 BPM OUT
- MUD WEIGHT: 8.58 PPG IN, 6.54 PPG OUT
- DWOB: 3.4 - 3.8 KLBS
- CIRC PRESSURE: 2500 - 2650 PSI
AT 11527.5 PUMP 10 BELS LO / HI VIS
SWEEPSAROUND.
-APPEAR TO HAVE EXITED CASING AT 11529'
BASED ON MILLING PARAMETERS. PUMP UP
A SAMPLE FROM THAT DEPTH. -SAMPLE AT
11529' CONFIRMED TO HAVE SHUBLIK
FORMATION
Printed 1/28/2019 11:24:33AM '"All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Common Well Name. P-04
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2018
Pmiect PBU Site: P
AFE No
End Date: 113/2019 X3 -0197J -C.(2,351,407 00
I Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 1200 00AM Rig Release:
Page 13 of 30
Rig Contractor: NABORSALASKA DRILLING INC.
- 0000
2.25
BPUOI: USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
11,539.00
WEXIT
POOH FROM 11515' TO 900'
Date From - To Him Task
Code NPT Total Depth
Phase
Description of Operations
(hr)
Usti)_
-OPEN EDC, POOH.
_
1830 - 2000 3.50 STWHIP
P 11,539.00
WEXIT
MILL 10' RATHOLE PER PROGRAM FROM
BOW 11 529'TO 11539'
12/25/2018 0000
- 01:00
1.00
- RATE: 2.84 BPM IN, 2.94 BPM OUT
P
11,539.00
WEXIT
- MUD WEIGHT: 8.59 PPG IN, 8.54 PPG OUT
- DWOB: 3.4 - 3.8 KLBS
- CIRC PRESSURE: 2500 - 2650 PSI
2000 - 2145 175 STWHIP
P 11,539.00
WEXIT
PERFORM 3 REAMING PASSES AT VPER
MINUTE FROM 11539' -11515'
-PASS 1 ATAS MILLED TFO-CLEAN
-PASS 2 AT 15 DEGREES LEFT OF AS MILLED
101:00
- 02:30
1.50
TFO-CLEAN
P
11,539.00
WEXIT
-PASS 3 AT 15 DEGREES RIGHT OF AS
MILLED TFO-CLEAN
-PUMP SBBL HI VIS SWEEP OUT OF THE BIT
ON PASS 3 AND ABOVE EDC PRIOR TO DRY
DRIFT.
-DRY DRIFTAT 20' PER MINUTE -CLEAN
-DYNAMIC FLOW CHECK AT 1 BPM ABOVE
WINDOW FOR 10 MINUTES-OABBLS LOSS
21:45
- 0000
2.25
STWHIP
P
11,539.00
WEXIT
POOH FROM 11515' TO 900'
-OPEN EDC, POOH.
'PUMP 3_.5 _BPM /2,_700 PSI.
12/25/2018 0000
- 01:00
1.00
STWHIP
P
11,539.00
WEXIT
POCH FROM 900' TO 236'
PERFORM .05 HOUR FLOW CHECK -GOOD
HOLD PJSM WITH CREW ON UPCOMING BHA
SWAP
101:00
- 02:30
1.50
STWHIP
P
11,539.00
WEXIT
LD BHA#2
- POOH FROM 238'-132' CHECK COIL
CONDITION -GOOD
- BREAK INJECTOR OFF WELL
- LD BHA #2
NOTE 3.79" NO GO ON MILL
3.78" NO GOON REAMER _ _ _
02:30
- 03:30
1.00
DRILL
P
11,539.00
PROD1
MU BHA#3
- BHA MADE UP ON PREVIOUS TRIP OUT OF
HOLE AND STOOD BACK
- RUN BHA INTO STACK AND MU TO
INJECTOR
- MAKE INJECTOR ONTO LUBRICATOR
- TEST CONNECTION AT QUICK TEST SUB TO
3500 PSI_
03:30
- 07:00
3.50
DRILL
P
11,539.00
PROD?
RIH WITH 4.25° BHA#3 BUILD BHA TO 9700'
- RATE: 0.50 BPM IN, 0.50 BPM OUT. CIRC
PRESSURE: 890 PSI
-MUD WEIGHT: 8.56 PPG IN, 8.53 PPG OUT
PVT: 253 BELS
-TIE-IN DEPTH, CORRECT -7 FT.
- CLOSE EDC.
- PASS THROUGH WINDOW WITH NO PUMP,
OL TF, 10 FT/MIN WITH NO ISSUES.
-TAG BOTTOM LIGHTLY, PICK UPAND TURN
ON PUMPS.
07:00
- 12:00
5.00
DRILL
P
11,635.98
PRODt
DRILL 4.25' BUILD FROM 11,538'MD 7O 11,636'
MD (8885' TVD)
- FREE SPIN: 2936 PSI, 2.70 BPM
- RATE: 2.70 BPM IN, 2.73 BPM OUT. CIRC
PRESSURE: 2989-3097 PSI
- MUD WEIGHT: 8.57 PPG IN, 8.61 PPG OUT,
ECD: 10.14 PPG
- ROP: 17.4 FT/HR, WOB: 2.5 —3.7 KLBS
Printed 1/28/2019 11:24:33AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 14 of 30
Common Well Name. P-04
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Stan Date: 12115/2018 End Date'. 1/3/2019
X3 -0197J -C: (2,351,407 00 )
Project: PBU Site: P
Rig Name/No.: CDR -2 Spud Date/time: 6/11/1991 12:00:OOAM
Rig Release:
Rig Contractor: NABORSALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth
Phase
Description of Operations
(hr) (usft)
.___
1200 - 1330 1.50 DRILL P 11,635.98
PROD?
POOH FOR LOG TO IDENTIFY JEWELRY
-JOG IN OPEN HOLE
-OPEN EDC AND BRING UP PUMP RATE TO
CLEAR BHA OF CUTTINGS
-TIE-IN DEPTH, CORRECT+1 FT.
- RIH AND CLOSE EDC
- LOG WHILE RIH F/ 11,300' T/ 11,380.19
-RIH T/11,500'
- LOG F/ 11,500' T/ 11,562' RA MARKER AT
11,526'
_ _-
RIH _T/11,636' _
13:30 - 18:00 4.50 DRILL P 11,733.00
PRODt
DRILL 4.25" BUILD FROM 11,636'MD 7011733'
MD (8874' TVD)
- FREE SPIN: 2969 PSI, 2.74 BPM
- RATE: 2.73 BPM IN, 2.78 BPM OUT. CIRC
PRESSURE: 2988-3002 PSI
- MUD WEIGHT: 8.57 PPG IN, 8.61 PPG OUT,
ECD: 10.14 PPG
- ROP: 21.55 FT/HR, WOB: 2.33-2.67 KLBS
1800 - 0000 6.00 DRILL P 11,773.00
PROD1
DRILL 4.25" BUILD FROM 11,733' MD TO 11773'
MD (8878' TVD)
- FREE SPIN: 2969 PSI, 2.74 BPM
- RATE: 2.89 BPM IN, 2.94 BPM OUT. CIRC
PRESSURE: 2988 - 3002 PSI
- MUD WEIGHT: 8.57 PPG IN, 8.61 PPG OUT,
ECD: 10.14 PPG
-ROP: 6.6 FT/HR, WOB: 2-4 KLBS
12/26/2018 00:00 - 01:30 1.50 DRILL P 1178600
PROD1
DRILL 4.25" BUILD FROM 11,773'MD 7011786'
MD (8878' TVD)
- FREE SPIN: 2969 PSI, 2.74 BPM
- RATE: 2.89 BPM IN, 2.94 BPM OUT. CIRC
PRESSURE: 2988-3002 PSI
- MUD WEIGHT: 8.57 PPG IN, 8.61 PPG OUT,
ECD: 10.14 PPG
ROP: 8.7 FT/HR, WOB: 2-4 KLBS
01:30 - 05:00 3.50 DRILL P 11,786.00
PROD1
POOH FROM 11 786'TO SURFACE
-LAST SURVEY CAME BACKAT A41 DEGREE
DOGLEG AND SLOW ROP. DECIDE TO POOH,
REDUCE MOTOR BEND AND CHECK BHA
-PUMP 5 BBL LOW VIS SWEEP FOLLOWED BY
A 5 BBL HI VIS SWEEP.
-POOH TO WINDOW -REDUCE PUMP RATE TO
.3 BPM PULLING THROUGH WINDOW
-PULL THROUGH WINDOW AT 0 DEGREES
-OPEN EDC AND PERFORM DYNAMIC FLOW
CHECK FOR 10 MINUTES -1 BBL LOSS
-POOH PUMP 3.8 BPM/3300 PSI HOLDING 10.1
PPG EM W AT WINDOW FOR THE TRIP.
NOTE: SWEEPS BRING BACK 40% EXCESS
CUTTINGS.
Printed 112812019 11:24:33AM **All depths reported in Drillers Depths"
North Amenca - ALASKA - BP Page 15 of 30
Operation Summary Report
Common Well Name. P-04 AFE No
Event Type: RE -ENTER -ONSHORE (RON) Start Date: 12/15/2018 End Date: 1/3/2019 X3 -0197J -C'. (2,351 407.00 )
Project: PBU Site: P
Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:00 OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr)_ _ (usft)
05:00 - 07:00 2.00 DRILL P 11,78800 PROD? MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
-CLOSE EDC, POWER DOWN
- INJECTOR OFF: 05:20
INSPECT LAST 50'OF CT FOR CHROME
ABRASION, NOTHING SEEN.
BIT IS 5-1
MAKE UP 4.25' BUILD DRILLING BHA#4
-PICKUP 2-7/8" ULS MOTOR (2.7 DEG AKO)
AND 3" COILTRAK TOOLS
- MAKE UP 3.75" X 4.25" HYC BICENTER BIT
WITH DURAFORCE CUTTERS AND TORQUE
CONTROLBUTTONS
- SURFACE TESTED COILTRAK TOOL. GOOD
TEST.
- PRESSURE TEST QTS TO 3,500 PSI HIGH
FOR 5 MINUTES, GOOD
'-INJECTOR ON: 07:00
0700 - 11:30 4.50 DRILL P 11786.00 PROD1 RIH WITH 4.25" BUILD DRILLING BHA#4
- RATE: 0.48 BPM IN, 0.51 BPM OUT. CIRC
PRESSURE: 1364 PSI
'- MUD WEIGHT: 8.52 PPG IN, 8.53 PPG OUT
-ADHERE TO PRESSURE SCHEDULE
KEEPING ECD AT 10.21PPG EMW
WEGHT CHECKAT 11,392' WITH 47K UP AND
23K DOWN
- LOG GR TIE IN, -13 FT CORRECTION
- CONTINUE RIH
- CLOSE EDC @ 11,500'
- RIH AND SAT DOWN 7K AT 11,520
-ATTEMPTED FOUR TIMES WITH SAME
RESULTS AT+1- 20 FPM WITH TF 0°
- PICK UP 20' AND START PUMPS AT .3 BPM
WITH 1361 PSI AND RIH AT 5FPM WITH TF AT
0°
- ATTEMPT TO ENTER WINDOW TWICE AND
SAT DOWN 2K AND 3K
- DISCUSS WITH ODE AND ETL
- PUMP AT .3 BPM W/ 1361 PSI AND OREINT
TF TO 15° RIGHT AND RIH, SAT DOWN 2K AND
OBSERVED NO DECREASE IN WOB AFTER 5
MINUTES
Printed 1/282019 11:24:33AM **All depths reported in Drillers Depths"
Common Well Name: P-04
Event Type: RE-ENTER- ONSHORE(RON)
Project: PBU
North America - ALASKA- BP
Operation Summary Report
AFE No
Start Date: 12/15/2016 End Date. 1/3/2019 X3 -0197J -C: (2,351,407.00 )
Site: P
Page 18 of 30
Rig Name/No.: CDR -2
Spud Datemme: 6/1111991 12:00 ROAM
Rig Release:
Rig Contractor. NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB @91.64us8 (above Mean Sea Level)
Date From - To Him
Task Code
NPT Total Depth
Phase
Descnption of Operations
(hr)
(usd)
11:30 - 1530 4.00
_ _
DRILL N
11,786.00
PROD?
POOH WITH 4.25" BUILD DRILLING BHA#4
-ADHERING TO PRESSURE SCHEDULE TO
MAINTAIN 10.21PPG EMW ECD
- OPEN EDC AND POOH TO 11,479'
- DYNAMIC FLOW CHECK, NO FLOW
- POOH AT 90 FPM 3.72 IN, 3.31 OUT W/ 3180
PSI
- TRIP SHOWING 1/2 BBL GAIN
- DYNAMIC FLOW CHECK AT 7239' 1.431N,
1.47 OUT, NO FLOW
- PUMP AT 2.37 1N, 2.02 OUT WITH 416 PSI
AND CONT POOH
- FLOW CHECK WITH PUMPS OFF THROUGH
WHITEY VALVE ON LUBRICATOR AT 136',
GOOD NO FLOW CHECK
-POP INJECTOR OFF AND INSPECT 80' OF
COIL, NO ABNORMALTIES OBSERVED
'- UNSTAB COILAND STAND BACK BUILD BHA
#4
- BIT IS BALLED UP WITH SHUBLIK
FORMATION _
1530 - 1900 3.50
DRILL N
11,786.00
PROD1
i RIH WITH CLEAN OUT ASSEMBLY
'- PICK UP PRE -ASSEMBLED MILL BHA # 5
- STAB COILAND TEST QTS. GOOD TEST
- OPEN EDC AND TEST MWD, GOOD TEST
-RIH WITH 3.78" MILLASSEMBLYAT 90 FPM,
1.00 BBL IN, 1.44 BBL OUT, 1095 PSI PUMP
PRESSURE FROM SURFACE TO 11330'
TIE IN AT 11330' -16.5-
-CLOSE EDC, GET PARAMETERS: UP WT 46K,
DN Wr 22K, 2850 PSI AT 2.8 BPM.
-RIH FROM 11330' TO 11500'
19:00 - 21:30 2.50
DRILL N
11,786.00
PROD?
CLEAN OUT WINDOW
- PARAMETERS UP WT 461 DN WT 22K, 2850
PSI AT 2.8 BPM.
-RIH FROM 11 500'TO 11 539'CLEAN AT 3
FPM -MAX DIFF ON MOTOR 70 PSI NO
WEIGHT,
-PULL UP THROUGH WINDOW CLEAN.
-RIH FROM 11500' TO 11 539'CLEAN AT 5
FPM -MAX OFF ON MOTOR 50 PSI NO
WEIGHT,
-PULL UP THROUGH WINDOW CLEAN.
-DRY DRIFT WINDOW CLEAN
-PUMP 10 BBL LOW VIS, 10 BBL HI VIS SWEEP
TO SURFACE WHILE CONTINUING TO WORK
FROM 11280'70 TOP OF WINDOWAT 11518,
FOLLOW WITH SECOND 5 BBL LOW VIS, 5
BBL HI VIS SWEEP TIMED TO BEAT BIT WITH
FIRST SWEEP OUT OF THE HOLE. NO
INCREASE IN CUTTINGS WITH 1ST SWEEP
AT SHAKERS.
-DRY DRIFT WINDOW FINAL- CLEAN
-POOH TO 11505' OPEN EDC
-PERFORM DYNAMIC FLOW CHECK FOR 10
MINUTES- 0.9 BBL LOSS
NOTE: NO INCREASE IN CUTTING OBSERVED
WITH EITHER SWEEP.
Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths"
North America - ALASKA- BP
Operation Summary Report
Common Well Name: P-04
Event Type: RE-ENTER- ONSHORE (RON)
Stan Date. 12/15/2018
Project: PBU
Site: P
Rig Name/No.: CDR -2
Spud DateTme: 6/11/1991
Rig Contractor: NABORSALASKA DRILLING INC.
11505' TO 700'
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To Him
Task Code NPT
(hr)
21:30 - 00:00 2.50
DRILL N
12/27/2018 0000 - 0030 0.50 DRILL N
0030 01:30 1.00 DRILL N
01:30 - 0430 3.00 DRILL N
0430 - 0600 1.50 DRILL P
0600 - 17:30 11.50 DRILL P
End Date: 1/3/2019
12:00:OOAM
AFE No
K3 -0197J -C: (2,351,407.00 )
Rig Release:
Page 17 of 30
Total Depth
Phase Description of Operations
(usft)
-DISCONNECT INJECTOR FROM LUBRICATOR
11,786.00
PRODI POOH WITH CLEANOUT ASSEMBLY FROM
11505' TO 700'
POOH PUMPING AT 3.5 BPM FOLLOWING ECD
SCHEDULE TO HOLD 10APPG EMWAT
WINDOW.
11,786.00
PROD1 POOH WITH CLEANOUT ASSEMBLY FROM700'
11,786.00 j
TO SURFACE'
-POOH PUMPING AT 3.5 BPM FOLLOWING
ECD SCHEDULE TO HOLD 10.IPPG EMW AT
WINDOW.
-JOG BACK IN HOLE TO 500'
-POH BACK TO SURFACE.
-FLOW CHECK AT SURFACE -STATIC,
HOLD PJSM FOR BHA OPERATIONS DURING
FLOW CHECK
11,786.00
PROD1 'CHANGE OUT BHA
-DISCONNECT INJECTOR FROM LUBRICATOR
-BREAK OUTAND STAND BACK CLEANOUT
BHA
-RUN BUILD BHA IN HOLE
-MAKE UP BUILD BHATO INJECTOR
-MAKE UP INJECTOR TO LUBRICATOR
_ _ _-TEST
OTS TO 3500PSI. GOOD _
11,786.00 j
PROD1 . RIH WITH 4.25" BUILD DRILLING BHA#4
- RATE: 0.48 BPM IN, 0.51 BPM OUT. CIRC
PRESSURE: 1364 PSI
- MUD WEIGHT: 8.63 PPG IN, 8.63 PPG OUT
-ADHERE TO PRESSURE SCHEDULE
KEEPING ECD AT 10.21 PPG EM W
- WEGHT CHECK AT 11,392' WITH 48K UP AND
22K DOWN
- LOG GR TIE IN, -17 FT CORRECTION
- CONTINUE RIH
- CLOSE EDC @ 11,500-
1,500'-PASSTHROUGH
-PASS THROUGHWINDOW CLEAN
SEE 5K REDUCTION IN DWOB AT 11580'
-WORK PAST AREA I TIME CLEAN.
-CONT RIH TO 11750', BRING PUMPS UP TO
_
2.9 BPM AT 3250 PSI,48KUPAND22KDOWN
11,820.00
PROW DRILL 4.25" BUILD FROM 11,786'MD TO 11820'
MD (8883' TVD)
- FREE SPIN: 3250 PSI, 2.9 BPM
- RATE: 2.90 BPM IN, 3.0 BPM OUT. CIRC
PRESSURE: 3320 - 3340 PSI
- MUD WEIGHT: 8.69 PPG IN, 8.63 PPG OUT,
ECD: 10.21 PPG
- ROP: 22.6 FT/HR, WOB: 2-3.5 KLBS
11,930.00
PROD1 DRILL 4.25' BUILD FROM 11,820' MD 7O 11930'
MD (8893' TVD)
- FREE SPIN: 3250 PSI, 2.7 BPM
- RATE: 2.59 BPM IN, 2.89 BPM OUT. CIRC
PRESSURE: 3320 - 3380 PSI
- MUD WEIGHT: 8.69 PPG IN, 8.63 PPG OUT,
ECD: 10.21 PPG
- ROP: 9.6 FT/HR, WOB: 3-4 KLBS
Printed 1/2811019 11:24:33AM **All depths reported in Drillers Depths"
Common Waif Name. P-04
Event Type: RE-ENTER- ONSHORE(RON)
North America - ALASKA - BP Page 18 of 30
Operation Summary Report
Start Date. 12/15/2018 End Date. 1/3/2019
AFE No
K3 -0197J -C'. (2,351,407.00 )
Project: PBU Site: P
Rig Name/No.: CDR -2 Spud Dale/Time: 6/11/1991 12:00:OOAM Rig Release:
Active datum: KB @91.64usft (abc
Date From - To
17:30 - 21:15
21:15 - 00:00
12/28/2018 0000 - 01:00
Mean Sea
Hrs
(hr)
3.75
Task
DRILL
Code NPT Total Depth Phase Description of Operations
(usfi
N 11,930.00 PROD1 POOH FOR TOOL FAILURE -LOWER HALF OF
2.75 DRILL IN
1.00 DRILL N
01:00 - 01:30 0.50
01:30 - 0200 0.50
0200 - 0330
03:30 04:15
1.50
DRILL N
DRILL P
DRILL P
0.75 DRILL N
Printed 1128/2019 1124.33AM **All depths reported in Drillers Depths"
COILTRAK TOOL
-PUMP 10 BBL LO VIS & 10 BBL HI VIS SWEEP
PULL TO WINDOW WHILE CHASING SWEEP.
-WORK THROUGH TIGHT SPOT AT 11645'
WORK THROUGH -8K WOB
-PULL THROUGH WINDOW WITH PUMPS OFF,
WORK THROUGH TIGHT SPOT AT BOTTOM
OF WINDOW 11534' LIMITING OVERPULL TO
4K CAME THROUGH ON 4 ATTEMPT.
-PUMP 5 BBL LO VIS & 5 BBL HI VIS SWEEP
TIMED TO BEAT 11515 WHEN SWEEP
REACHES BIT.
-CHASE SWEEP TO 11300', JOG BACK IN
HOLE TO 11515' OPEN EDC.
-PUMP SWEEP TO SURFACE AT 4 BPM -000
INCREASE IN CUTTINGS OBSERVED AT
SURFACE.
-PUMP AN ADDITIONAL 10 BBL HI VIS & 10 BBL
LO VIS SWEEP WHILE PERFORMING
DYNAMIC FLOW CHECK. ONCE SWEEP IS
OUT EDC POOH CHASING SWEEP.
11,930.00
PROD? POOH WITH BUILD ASSEMBLY FROM 11515
TO SURFACE
-POOH PUMPING AT 3.5 BPM FOLLOWING
ECD SCHEDULE TO HOLD 10.1 PPG EMW AT
WINDOW.
-JOG BACK IN HOLE TO 500' TWICE DUE TOA
HIGH AMOUNT OF SHALE CUTTINGS COMING
OVER SHAKERS._
11,930.00
PROD? POOH WITH BUILD ASSEMBLY FROM 500' TO
SURFACE
-POOH PUMPING AT 3.5 BPM FOLLOWING
ECD SCHEDULE TO HOLD 10.1 PPG EMW AT
WINDOW.
-CONTINUE TO JOG BACK IN HOLE TO 500'
DUE TO A HIGH AMOUNT OF SHALE
CUTTINGS COMING OVER SHAKERS.
-POH BACK TO SURFACE.
-FLOW CHECKAT SURFACE -STATIC.
HOLD PJSM FOR BHA OPERATIONS DURING
FLOW CHECK
12,125.00
PROD1 CHANGE OUT BHA
-DISCONNECT INJECTOR FROM LUBRICATOR
-BREAK OUT AND STAND BACK BUILD BHA
-LAYDOWN MOTOR AND BIT-INSPECTAND
CHANGE 3-1
11,930.00
PROD1 FUNCTION TEST BOPS FROM DRILLERS
PANEL.
-TESTANNULAR, 2 3/8" PIPE SLIPS X 2,2 3/8"
X 3 1/2" VARIABLES, BLINDS AND HI
ALL FUNCTIONS GOOD
11,930.00
PROD1 INSTALL FLOATS IN UQC
CHANGE OUT STRIPPER PACKER
TEST 70250/3500 PSI FOR 5 MINUTES
EACH -GOOD TEST
11,930.00
PROD1 MAKE UP BHA
-RUN BUILD BHA IN HOLE
-MAKE UP BUILD BHATO INJECTOR
-MAKE UP INJECTORTO LUBRICATOR
Printed 1128/2019 1124.33AM **All depths reported in Drillers Depths"
-PUMPING AT VARIOUS RATES TO MAINTAIN A
10.6 EMW AT THE SHOE.
-SLOW DOWN TO 60 FPM POOH SPEED
BETWEEN 8600' AND 3600' FOR BETTER
HOLE CLEANING IN DEVIATED HOLE.
AT 1250' FEET MPD CHOKE STARTS TO CLOG
WITH SHALES. SWITCH OFF OF MPD CHOKE
AND RESUME PUMPING. RBIH TO 2250'.
CLEAR MPD CHOKE AND CONTINUE OUT OF
HOLE ON MPD CHOKE.
-JOG BACK IN HOLE TO 500' FROM SURFACE
-PERFORM 10 MINUTE FLOW CHECK PRIOR
TO HAVING BHA IN BOPS
Printed 1/28/2019 1124:33AM **All depths reported in Drillers Depths"
North America
- ALASKA -
BP
Page 19 or 30
Operation Summary Report
Common Well Name: P-04
AFE No
Event Type: RE -ENTER -ONSHORE (RON)
Start Date: 12/15/2018
Eod Date. 1/3/2019
X3 -0197J -C: (2,351,407.00 )
-Project: PBU
Site: P
Rig Name/No.: CDR -2
Spud Date/Time: 6/11/1991 12:00 OOAM
Rig Release'.
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001M
Active datum: KB ®91.64usft (above Mean Sea Level)
Date From - To Hrs
Task Code NPT
Total Depth
Phase
Description of Operations
(ho
__. _
(usft)
0415 - 0930 5.25
DRILL N
11,930.00
PROD1
RIH WITH 4.25" BUILD DRILLING BHA#7
- RATE: 0.30 BPM IN, 0.70 BPM OUT. CIRC
PRESSURE: 1641 PSI
- MUD WEIGHT: 8.69 PPG IN, 8.69 PPG OUT
-ADHERE TO PRESSURE SCHEDULE
KEEPING ECDAT 10.21PPG EMW
-TIE INTO GAMMA WITH A-20' CORRECTION
'- APROACH WINDOWAT HIGH CENTER AND
OBSERVED BIT ROLL TO 5° LEFT WITH I
BOBBLE
- RIH PUMPING AT.3 BPM AND SAT DOWN AT
11,570' AFTER 3 ATTEMPTS WITH PUMPS AT
.5 BPM INCREASE PUMP RATE TO 1 BPM AND
PASSED THROUGH ON 4TH ATTEMPT
- CONTINUE RIH AND SAT DOWN AT 11,617'
AND WORKED THROUGH ON 4TH ATTEMPT
- CONTINUE RIH AND TAKE CHECK SHOT
SURVEY. GOOD
0930 - 2045 11.25
_
DRILL P
12,125.00
PROD?
DRILL4.25"BUILD FROM 11,930'MDTO 12125'
MD(8918'TVD)
- FREE SPIN: 3099 PSI, 2.63 BPM
- RATE: 2.63-2.84 BPM IN, 2.69-2.87 BPM OUT.
CIRC PRESSURE: 3114-3397 PSI
- MUD WEIGHT: 8.63 PPG IN, 8.67 PPG OUT,
ECD: 10.49 PPG WITH OPEN CHOKE
-PUMP 10 BBL LO VIS X 10 BBL HI VIS SWEEP
AT 3 BPM AT 11930' AND 11980'
ROP: 17.3.3 FT/HR, WOB. 3-5 KLBS
20 45 - 0090 3.25
DRILL P
12,125.00
PROD1
POOH
-PUMP 10 BBL LO VIS X 10 BBL HI VIS SWEEP
AT 3 BPM
-POOH TO 11499 -PUMPING AT 0.3 BPM WHILE
BIT IS CROSSING WINDOW TRAY.
-PUMP SECOND 10 BBL LO VIS X 10 BBL HI
VIS SWEEP TIMED TO BE AT BIT WHEN
ABOVE WINDOW
-SHUT OFF PUMPS AND OPEN EDC
-JET TO BOTTOM OF TRAY THROUGH OPEN
EDC AT 4 BPM AT 3662 PSI
-CHASE SWEEP TO 11300'
-RUN BACK IN HOLE TO 11510'
-DISPLACE HOLE TO 9.8 PPG
12/29/2018 00:00 - 00:15 0.25
DRILL P
12,125.00
PROD1
PERFORM DYNAMIC FLOW CHECKAT 1
_
BPM -1.5 BBL LOSS
0015 - 0345 3.50
DRILL P
12,125.00
PROD1
POOH FROM 11 300'TO SURFACE
-PUMPING AT VARIOUS RATES TO MAINTAIN A
10.6 EMW AT THE SHOE.
-SLOW DOWN TO 60 FPM POOH SPEED
BETWEEN 8600' AND 3600' FOR BETTER
HOLE CLEANING IN DEVIATED HOLE.
AT 1250' FEET MPD CHOKE STARTS TO CLOG
WITH SHALES. SWITCH OFF OF MPD CHOKE
AND RESUME PUMPING. RBIH TO 2250'.
CLEAR MPD CHOKE AND CONTINUE OUT OF
HOLE ON MPD CHOKE.
-JOG BACK IN HOLE TO 500' FROM SURFACE
-PERFORM 10 MINUTE FLOW CHECK PRIOR
TO HAVING BHA IN BOPS
Printed 1/28/2019 1124:33AM **All depths reported in Drillers Depths"
Printed 1/28/2019 11:24:33AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 20 of 30
Operation Summary Report
Common Well Name. P-04
AFE No
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 1211512018
End Date. 1/3/2019
X3 -0197J -C(2, 351407.00)
Project: PBU
_
Site: P --
- -
Rig Name/No.: CDR -2
Spud Date/rime: 6/11/1991 12:00:00AM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB @91.64usR (above Mean Sea Level)
Date From - To
Hrs
Task Code NPT
Total Depth
Phase
Description of Operations
(110
(usft)
03:45 - 04:30
0.75
DRILL P
12,125.00
PROD1
CHANGEOUTBHA
-DISCONNECT INJECTOR FROM LUBRICATOR
-BREAK OUTAND STAND BACK BUILD BHA
-LAYDOWN MOTOR AND
BIT-INSPECT/CHANGE BIT AND CHANGE
MOTOR ANGLE TO 1.15 DEGREES
-RUN DRILLING BHA IN HOLE
-MAKE UP BUILD BHA TO INJECTOR
-MAKE UP INJECTOR TO LUBRICATOR
-TEST QTS TO 3500PSI. GOOD
NOTE: HELD KICK WHILE TRIPPING DRILL
WITH RIG CREW WITH -BHA OUT OF HOLE._
04:30 - 05:00
0.50
DRILL P
li 12,125.00
PROD?
RIH WITH 4.25" LATERAL BHA#8
-CLOSE EDC AND PUMP AT.3 BPM WITH 1239
PSI
.-PUW 47K, SOW 20KAT 11,475'
-ORIENT TOOL FACE TO HIGH CENTER AND
j
PASS THROUGH WINDOW WITH NO
PROBLEM
-CONTINUE IN HOLE F/ 11,529 T/ 12,125' AT 25
FPM, .32 BPM, 1242 PSI
05:00 - 08:00
3.00
DRILL P
12,125.00
PROD1
RIH WITH LATERAL 4.25" DRILLING BHA#8T/
11,360'
-OPEN EDC AND RIH MAINTAINING ECDAT
10.5EMW
08:00 - 08:30
0.50
DRILL P
12,125.00
PRODt
PERFORM CCL LOG
-LOG GAMMA RAY TIE IN -22.5' CORRECTION
-POOH T/ 11,250' AND LOG DOWN T/ 11,400'
-SEND RESULTS OF CCL LOG TO ODE
08:30 - 16:30
8.00
DRILL P
12,125.00
PROD?
DISPLACE WELLABOVE WINDOW
-PUMP 30 BBL SPACER AND DISPLACE
9.8PPG KILL WEIGHT FLUID FROM WELL
-DISPLACE NEW 8.6 PPG QUIKDRIL-N
16:30 - 17:00
0.50
DRILL P
12,125.00
PROD1
RIH WITH 4.25" LATERAL DRILLING ASSEMBLY
F/ 11,400'T/ 12,125'
-OBTAIN PARAMETERS AT 11,475' PUW 47K,
SOW 20K
-ORIENT TOOL FACE TO H IGH CENTER AND
PUMP AT .32 BPM W/ 1232 PSI
-PASS THROUGH WINDOW 7FPM WITH
NOTHING SEEN
-CONTINUE RIH AT 25FPM PUMPING AT .3
BPM WITH 1300 PSI
1700 - 1815
1.25
DRILL P
12,200.00
PROD1
DRILL 4.25" LATERAL FROM 12,125' MD TO
12200' MD (8931' TVD)
- FREE SPIN: 3400 PSI, 2.86 BPM
- RATE: 2.87 BPM IN, 2.98 BPM OUT. CIRC
PRESSURE: 3530 — 3700 PSI
- MUD WEIGHT: 8.65 PPG IN, 8.58 PPG OUT,
ECD: 10.12 PPG
- ROP: 50 FT/HR, WOB: 3.5-4 KLBS
NOTE: TEMPORARILY DETAINED AT 12200',
1815 - 1915
1.00
DRILL N
12,200.00
PRODi
WORKING BHA FREE AT 12200', PULL THREE
TIME AT 30K OVER STRING WT. CONTINUED
TO CIRC AT 2 BPM WHILE MOVING CUTTINGS
UP HOLE WITH 20 K OVER STRING WT. COIL
CAME FREE.
-WIPER TRIP WITH LO/HI VIS 5BBL SWEEP
FROM 12200'-11960;
Printed 1/28/2019 11:24:33AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Operation Summary Report
Page 21 of 30
Common Well Name. P-04
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date. 12/15/2018 End Date: 1/3/2019
X3 -0197J -C: (2,351.407 00 )
Project: PBU Site: P
Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:0000AM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB @91.64us6 (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase
Desuiptlon of Operations
(hr) _ _ Milt)
19:15 - 19:30 0.25 DRILL P 12,209.00 PROD1
DRILL 4.25°LATERAL FROM 12,200'MD TO
12209' MD (8932' TVD)
- FREE SPIN: 3400 PSI, 2.86 BPM
- RATE: 2.87 BPM IN, 2.98 BPM OUT. CIRC
PRESSURE: 3530 — 3700 PSI
-WIPER TRIP WITH LO/HI VIS SBBL SWEEP
FROM 12200'-11960;
- MUD WEIGHT: 8.65 PPG IN, 8.58 PPG OUT,
ECD: 10.12 PPG
- ROP: 50 FT/HR, WOB: 3.5-4 KLBS
NOTE: TEMPORARILY DETAINED AT 12209',
1930. - 0090 4.50 DRILL P 12,209.00 PROD1
STUCKAT 12209', PULLTHREE TIME AT 30K
OVER STRING WT.
-SHUT DOWN PUMP WITH NEUTRAL STRING
WMEGHT FOR 20 MINUTES.
-ATTEMPT TO PULL FREE WITH 30K OVER
STRING WEIGHT, STILL DETAINED
-HOLD PJSM WITH CREW FOR PUMPING
MINERAL OIL.
-PUMP 10 BBL KCL SPACER, 20BBLS MINERAL
OIL, 10BBL SPACER.
-SPOT 10 BBLS ON MINERAL OIL IN ANNULUS,
SOAK FOR 20 MINUTES ATTEMPT TO PULL TO
30 K OVER STRING WEIGHT NO
IMPROVEMENT.
-WORK PIPE FROM NEUTRAL WEIGHT TO 30K
OVER WITH NO IMPROVEMENT.
SPOTAN ADDITIONAL S BBLS ON OUTSIDE
OF PIPE FOR 15 BBLS TOTALAND SOAK FOR
20 MINUTES.ATTEMPT TO PULL TO 30 K OVER
STRING WEIGHT NO IMPROVEMENT.
-SPOT AN ADDITIONAL 5 BBLS ON OUTSIDE
OF PIPE FOR 20 BBLS TOTALAND SOAK FOR
20 MINUTES.ATTEMPT TO PULL TO 30 K OVER
STRING WEIGHT NO IMPROVEMENT
-WORK PIPE FROM NEUTRAL WEIGHT TO 30K
OVER WITH NO IMPROVEMENT.
NOTE CALL FOR CRUDE TANKER -BEING
SENT TO SLB FOR TESTING.
12/30/2018 00:00 - 00'.30 0.50 DRILL N 12,209.00 PROD?
STUCK AT 12209',
-WORK PIPE FROM NEUTRAL WEIGHT TO 30K
OVER WITH NO IMPROVEMENT.
00:30 - 0200'. 1.50 DRILL N 12,209.00 PROD1
CIRCULATE OUT MINERAL OIL.
-CIRCULATE OUT 20 BBLS OF MINERAL OIL
AND 20 BBLS OF KCL SPACER TO PREPARE
FOR NEXT STEP.
-CIRCULATE AT 2 BPM TAKING RETURNS TO
TIGER TANK WHEN KCL AND MINERAL OIL TO
SURFACE _
02:00 - 04'.15 2.25 DRILL N 12,209.00 PROD?
STUCKAT 12209',
-HOLD PJSM WITH CREW FOR PUMPING
MINERAL OIL.
-PUMP 10 BBL KCL SPACER, 40 BBLS
MINERAL OIL, IOBBL SPACER.
-SPOT20 BBLS ON MINERAL OIL IN
ANNULUS, SOAK FOR 20 MINUTES ATTEMPT
TO -PULL TO 30 K OVER STRING WEIGHT ON
THIRD TRY ORIENT MOTOR 180 DEGREES
OUT, PULL FREE AT 30K OVER STRING WT..
Printed 11282019 11:24:33AM **All depths reported in Drillers Depths"
North America - ALASKA - 3P
Operation Summary Report
Common Well Name: P-04 AFE No
Event Type. RE-ENTER- ONSHORE(RON) Start Date: 12/15/2018 End Cate 1;3/2019 X3 -0197J -C.(2, 351407.00)
Page 22 of 30
Project: PBU Site: P
Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12.00:OOAM
Rig Release:
Rig Contractor NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB 1@91 a4usft (above Mean Sea Level)
Date From - To HIM Task Code NPT Total Depth
Phase Description of Operations
(hr) (usft)
_
04:15 - 05:30 1.25 DRILL N 12,209.00
PROD? CIRCULATE OUT MINERAL OIL.
-CIRCULATE OUT40 BBLS OF MINERAL OIL
AND 20 BBLS OF KCL SPACER TO PREPARE
FOR NEXT STEP.
-WORK COIL UP TO WINDOW AFTER
MINERAL OIL IS CLEAR OF BIT.
-OPEN EDC
'.-CIRCULATE AT BPM HOLDING 10.1 EMWAT
WINDOW
'.- SHIP SPACERS AND MINERAL OIL TO TIGER
TANK.
NOTE:START TO CONDITION MUD TO 60K CPS
_SRV
NOTE: PERFORM TIE IN AT 11320'+9'
0530 - 0630 1.00 DRILL N 12,209.00
PROW RIH WITH 4.25" LATERAL BHA F/11,501'T/
12,150'
- CLOSE EDC AND ORIENT TOOL FACE TO
HIGH CENTER AT 11,501'
- NO PUMP AND 17 FPM SAT DOWN SK AT
11,521'
- PICK UPAND AND RIH AT 25 FPM AND PASS
THROUGH WINDOW
AT 11,540' PUMP AT.56 BPM W/ 1927 PSI
- AT 1155TSAT DOWN 9K P/U AND INCREASE
PUMP RATE.66 BPM IN, .83 BPM OUT W/ 1590
PSI
- 11,563' SAT DOWN 7K PICK UPAND BRING
PUMP UP TO 1.22 BPM IN, 1.34 BPM OUT W/
1860 PSI RIH AT 25 FPM 8.63PPG IN, 8.64PPG
OUT
0630 - 1030 4.00 DRILL P 12,402.00
PROD? DRILL 4.25" LATERAL FROM 12,209' MD TO
12,402 -MD
- FREE SPIN: 3236 PSI, 2.78 BPM IN, 2.81 OUT
W/ 3296 PSI
- MUD WEIGHT: 8.67 PPG IN, 8.60 PPG OUT,
ECD: 9.97 PPG EMW
- FOR: 60-90 FT/HR, WOB: 1-2.2 KLBS
-SEND 5X5 SWEEP
- GETTING STICKYAND WIPING BHA
- AFTER DRILLING TO 12,402 PERFORMING
BHA WIPERAND WHILE GOING BACK TO
BOTTOM BECAME DETAINED AT 12,378'
10:30 - 13:45 3.25 DRILL N 12,402.00
FROM STUCK AT 12,378'
- RELAX PIPE AND ATTEMPT PULL FREE WITH
NO LUCK
- HOLD PJSM WITH CREW FOR PUMPING
MINERAL OIL.
- PUMP 10 BBL KCL SPACER, 20 BBLS
MINERAL OIL, 1 OBBL SPACER.
-SPOT10 BBLS ON MINERAL OIL IN
ANNULUS AND SOAK FOR 20 MINUTES
-ATTEMPT TO PULL TO 30 K OVER STRING
WEIGHT WITH NO LUCK
- PUMP SECOND 10 BBL INTO ANNULUS AND
SOAK FOR 20 MINUTES
- ATTEMPT TO PULL TO 30 K OVER STRING
WEIGHT WITH NO LUCK
- ORIENTER FREE
Printed 1/28/2019 11.24.33AM **All depths reported in Drillers Depths"
North America - ALASKA- BP
Operation Summary Report
Common Well Name: P-04
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2018
Project: PBU Site: P
Rig Name/No.: CDR -2 Spud DateTme: 6/11/1991
Rig Contractor: NABORS ALASKA DRILLING INC.
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT
(hr)
1345 - 15.30 1.75 DRILL N
15.30 - 00:00 8.50 DRILL N
12/31/2018 00:00 - 01:45 1.75 DRILL N
Page 23 of 30
End Date: 1/3/2019 X3 -0197J -C: (2,351,407.00 )
Rig Release:
Total Depth
Phase Description of Operations
12,402.00
PROD1 CIRCULATE OUT MINERAL OIL.
- PLACE STRING IN NEUTRAL
- CIRCULATE OUT 20 BBLS OF MINERAL OIL
'AND 20 BBLS OF KCL SPACER TO PREPARE
I FOR NEXT STEP.
- CIRCULATE AT 3 BPM HOLDING 10.1 EMW AT
WINDOW
- SHIP SPACERS AND MINERAL OIL TO TIGER
TANK
- MUD AT 58K CPS LSRV
'DISCUSS RESULTS WITH ODEAND WSUP,
DECISION MADE TO PUMP A40 BBL LVT PILL.
WAIT ON PUP TRAILERS TO RETURN TO
LOCATION
12,402.00
PROD1 STUCK AT 12,378'
,-HOLD PJSM WITH CREW FOR PUMPING
MINERALOIL.
--PUMP IO BBL KCL SPACER, 40BBLS
MINERAL OIL, 10BBL SPACER.
- SPOT20 BBLS ON MINERAL OIL IN
ANNULUS, SOAK FOR 20 MINUTES ATTEMPT
TO PULLTO 30 K OVER STRING WEIGHT NO
IMPROVEMENT.
- WORK PIPE FROM NEUTRAL WEIGHT TO
30K OVER WITH NO IMPROVEMENT.
- SPOT AN ADDITIONAL 10 BBLS ON OUTSIDE
OF PIPE FOR 30 BBLS TOTALAND SOAK FOR
20 MINUTES.ATTEMPT TO PULLTO 30 K OVER
STRING WEIGHT NO IMPROVEMENT.
- SPOT AN ADDITIONALIO BBLS ON OUTSIDE
OF PIPE FOR 40 BBLS TOTALAND SOAK FOR
20 MINUTES.ATTEMPT TO PULL TO 30 K OVER
STRING WEIGHT NO IMPROVEMENT
-WORK PIPE FROM -5K FROM NEUTRAL
WEIGHT TO 30K OVER WITH NO
IMPROVEMENT..
-SOAK FOR AN ADDTIONAL 30 MINUTES.
-WORK PIPE FROM -5K FROM NEUTRAL
WEIGHT TO 30K OVER WITH NO
IMPROVEMENT.
-PUMP MINERAL OIL TO SURFACE, BLEED
IMPOSED PRESSURE AND WORK FROM -5K
FROM NEUTRAL WEIGHT TO 30K OVER WITH
NOIMPROVEMENT.
-PUMP SPACER AND MINERAL OIL TO TIGER
_
TANK.
12,402.00
PROD1 WORKSTUCKPIPE
-PJSM WITH CREW
-ORIENT MOTOR TO LOWSIDE
-SPOT MINI TANKER WITH 60 BBLS OF
MINERAL OILAND RIG UP LINESPUMP 60 BBL
OF MINERAL OIL WITH A 15 BBL LEAD/TAIL
SPACER, SPOTTING 30 BBLS MINERAL OIL
OUTSIDE OF PIPE WITH PIPE IN TENSION.
-AS SOON AS 30 BBLS OF MINERAL OIL IS
OUTSIDE PIPE, PIPE CAME FREE.
NOTE: AS SOON AS PIPE CAME FREE
EXPERIENCED DYNAMIC LOSSES OF 30 BBLS
PER HOUR. REDUCED ECD TO 9.0 PPG AND
REGAINED FULL RETURNS, SLOWLY
RETURNED ECOS TO 106 PPG WITH FULL
RETURNS.
Printed 1/28/2019 11:24:33AM ••AJI depths reported in Drillers Depths—
Common Well Name. P-04
Event Type. RE-ENTER- ONSHORE (RON)
Rig Name/No.: CDR -2
Active datum: KB @91.64us8 (above Mean Sea
Date From - To Him
(hr)
01:45 - 0415 2.50
0415 - 0730 3.25
0730 - 1030 3.00
1030 - 1230 2.00
North America - ALASKA - BP Page 24 of 30
Operation Summary Report
Stan Date: 12/15/2018 End Date: 1/3/2019
Site: P
Spud Date/Time: 6/11/1991 12:00:00AM
AFE No
{3-0197)-C: (2,351 407 00 )
BPUOI: USA00001646
Task Code NPT Total Depth Phase Description of Operations
(usft)
DRILL N 12,402.00 PROD1 CIRCULATE OUT SPACERS, MINERAL OILAND
DRILL N
DRILL N
DRILL P
12.30
- 17:00
4.50
DRILL N
1700
- 1815
1.25
DRILL N
18:15 - 18:45 0.50 DRILL N
Printed 1/2812019 11:24:33AM **All depths reported in Drillers Depths"
CONDITION HOLE
-CIRCULATE OUT SPACER AND MINERAL OIL
WHILE RECIPROCATING PIPE.
-PUMP 10 BBL LO VIS X 10 BBL HI VIS SWEEP
AT 3 BPM. HI VIS WEIGHTED TO 9.1 PPG.
-POOH TO 11510 -PUMPING AT 2 BPM WHILE
BIT IS CROSSING WINDOW TRAY. 4K
OVERPULL COMING THROUGH WINDOW
WITH BHAAT 11575'. PUMP PRESSURE
COMING UP INDICATING PACK OFF, RBIH 20'
AND COME UP THROUGH WINDOW WITH NO
ISSUES.
-SHUT OFF PUMPS AND OPEN EDC
12,402.00
PROD1 WIPER TRIP 7O 3600'
-JET TO BOTTOM OF TRAY THROUGH OPEN
EDC AT 3.5 BPM AT 3298 PSI
-WORKAREA BETWEEN WINDOWAND
BOTTOM OF 41/2" LINER X 2 AT 4 BPM
—PUMP 10 BBL LO VIS X 10 BBL Al VIS SWEEP
AT 3 BPM. HI VIS WEIGHTED TO 9.1 PPG.
TIMED TO COME OUT OF EDC AT 8600'
POOH FROM 10300' TO 8600' AT 80 FPM
POOH FROM 8600' TO 3600' AT 60 FPM
CHASING SWEEP OUT OF HOLE. -HAD
CHOKE PLUGGING ISSUES WITH SMALL
-MECHANICAL SHALE _CUTTINGS.
12,402.00
PROD? RIH
-RIH FROM 3600' TO 11385'
-TIE IN LOG FROM 11385' TO 11320',
CORRECTION+2'
-RIH FROM 11385' TO 11510' CLOSE EDC AND
PERFORM WEIGHT CHECK49K UP 22K
DOWN.
-RIH FROM 11510' TO 12407'. NOTE: TOOK
WEIGHTAT 11540' PU AND RUN BACK
THROUGH WITH NO ISSUES.
12,402.00
PROD? DRILL 4.25" LATERAL FROM 12,407' MD TO
12508' MD
- FREE SPIN: 3941 PSI, 2.71 BPM IN, 2.81 OUT.
ON BOTTOM 4156 PSI
- MUD WEIGHT: 8.67 PPG IN, 8.60 PPG OUT,
ECD: 9.97 PPG EMW
- ROP: 50 FT/HR, WOB: 2.1 KLBS
NOTE. BLOW DOWN CHOKE DUE TO
CLOGGING WITH SMALL MECHANICAL SHALE
CUTTINGS.___ _
12,508.00
PROD1 WORK ON BAKER HUGHES INTEO
COMPUTER SYSTEM DUE TO REAL TIME
DATA NOT UPDATING..
-RECIPROCATE PIPE F 12450'-12150'
PUMPING AT 2.7 BPM
PUMP 10 BBL HI VIS WEIGHTED SWEEP 9.1
PPG - NO INCREASE IN CUTTINGS NOTED AT
SWEEP BACK TO SURFACE
12,508.00
PROD? WIPERTRIP
-POOH FROM 12150' TO 11540' -SOME
PACKING OFF NOTED, JOG BACK IN HOLE TO
RELIEVE, NO OTHER ISSUES.
-GR TIE IN (RA) CORRECTION +5'
12,508.00
PROD1 RIH FROM 11540' TO 12508'
Printed 1/2812019 11:24:33AM **All depths reported in Drillers Depths"
Common Well Name: P-04
Event Type: RE-ENTER- ONSHORE (RON)
Rig NameMo.:
North America - ALASKA - BP Page 25 of 30
Operation Summary Report
Start Date'. 12/15/2018
Site: P
AFE No
End Date. 1/3/2019 X3 -0197J -C:(2,351,407.001
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001M
Active datum: KB Q91.64us8 (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) _ (ui _
18:45 - 19:15 0.50 DRILL P 12,536.00 PROD1 DRILL 4.25' LATERAL FROM 12,508'MD TO
19:15 - 22:45 3.50 DRILL N
22'.45 - 00:00 1.25 DRILL N
1/1/2019 0000 - 0300 3.00 DRILL N
03:00 - 03:45 0.75
03:45 - 04:30 0.75
DRILL N
DRILL N
Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths"
12538' MD
- FREE SPIN: 3941 PSI, 2.71 BPM IN, 2.81 OUT,
ON BOTTOM 4156 PSI
- MUD WEIGHT'. 8.67 PPG IN, 8.60 PPG OUT,
ECD: 10.5 PPG EMW
- ROP: 56 FT/HR, WO_B: 2.1 KLBS
12,536.00 PROD1
STUCK AT 12,536'
- RELAX PIPE AND ATTEMPT PULL FREE WITH
NO LUCK
- HOLD PJSM WITH CREW FOR PUMPING
'MINERALOIL.
- PUMP 10 BBL KCL SPACER, 20 BELS
MINERAL OIL, IOBBL SPACER.
-SPOT10 BBLS ON MINERAL OIL IN
,ANNULUS AND SOAK FOR 20 MINUTES
-ATTEMPT TO PULL TO 30 K OVER STRING
WEIGHT WITH NO LUCK
-PUMP SECOND 10 BBL INTO ANNULUS AND
SOAK FOR 20 MINUTES
- ATTEMPT TO PULLTO 30 K OVER STRING
WEIGHT WITH NO LUCK
NOTE: ORIENTER FREE
12,536.00 PROD1
STUCKAT 12,536'
-PREP TO PUMP CRUDE OIL
-DISPLACE SPACERS AND MINERALOIL
FROM ANNULUS -HOLDING COIL AT 30K OVER
STRING WEIGHT.
-HOLD PJSM WITH CREW COVERING OCN
FOR PUMPING CRUDE.
12,536.00 PRODI
WORK STUCK PIPEIPUMP CRUDE
-HOLD 20K OVERPULL ON COIL
-CHECK VALVE LINE UPS
-PUMP 20 BBLS OF KCL SPACER
-PUMP 86 BBLS OF CRUDE OIL (23 BBLS OUT
OF BIT) AT 2.3 BBLS PER MINUTE.
-COIL CAME FREE
-RECIPROCATE FROM 12531
-SWAP TO PUMPING 20 BBLS OF KCL
SPACER AT 2.6 BPM WHILE RECIPROCATING
PIPE.
-SWAP BACK TO 8.6 PPG QUICK DRILL N
-TAKE KCL SPACERS AND CRUDE OIL TO
TIGER TANK
12,536.00 PROD1
WIPERTRIP
-POOH FROM 12150' TO 11535' -SOME
PACKING OFF NOTED, JOG BACK IN HOLE TO
RELIEVE, NO OTHER ISSUES.
-GR TIE IN (RA) CORRECTION +8'
NOTE AT 12150' NOTICE CHOKE PRESSURE
AND ECDS CLIMBING, SWAP OFF DRILLING
CHOKEAND CLEAN SAME. CLEARED
PRESSURE BUILD UP.
12,536.00 PROD1
RIH FROM 11558' TO 12538' PUMPING AT.25
BPM THROUGH BUILD SECTION, INCREASE
RATE AT 12125TO 2.7 BPM.
Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 26 of 30
Operation Summary Report
Common Well Name. P-04
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2018 End Dale: 1/3/2019
X3 -0197J -C: (2,351,407.00 )
Project: PBU Site. P
Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:00:00AM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr) _ (usH)
04:30 - 11:30 7.00 DRILL P 12,945.00 PROD1
DRILL 4.25° LATERAL FROM 12,536'MDTO
12,945.13' MD
- FREE SPIN: 3705 PSI, 2.7 BPM IN, 2.68 OUT.
ON BOTTOM 3846 PSI
— MUD WEIGHT: 8.67 PPG IN, 8.60 PPG OUT,
ECD: 10.37 PPG EMW ON BOTTOM AND 10.2
EMW AT WINDOW
-PICK UP RATE T/ 2.9 AT 12,64TWITH FREE
SPIN AT 3925 PSI, ON BOTTOM 4270 PSI
- WIPING HOLE 150' AFTER DRILLING EVERY
150', PERFORM LONG WIPER WITH JOG AT
TOP OF LATERALAND TOP OF BUILD BEFORE
PASSING THROUGH WINDOW AT.3 BPM, 1230
PSI. WITH TF AT 0* HIGH SIDE
- OPEN EDCAND PUMPAT
PUMP 5BBL LO -VIS X 5BBL HI -VIS SWEEP AT
12,636', PUMP 15BBL LO -VIS X 15 BBL
WEIGHTED HI -VIS SWEEPAT 12,945' 30%
INCREASE IN CUTTINGS AT THE SHAKER
MOSTLY SAND WITH A LITTLE SHALE
1130 - 14:30 3.00 DRILL P 12,945.00 PROD1
LONG WIPER TRIP TO CLEAN OPEN HOLE
AND 5-1/2" TUBING
- PERFORM LONG WIPER WITH JOG AT TOP
OF LATERALAND TOP OF BUILD BEFORE
PASSING THROUGH WINDOW AT .5 BPM, 1230
PSI. WITH TEAT 0* HIGH SIDE WITH NO
PROBLEMS
- OPEN EDC AND PUMP AT 3.98 BPM WITH
4069 PSI
- JET WHIPSTOCK MOVING DOWN TO BIT
DEPTH OF 11,597' AND JETTING 5-1/2"
TUBING WHILE POOH T/ 11,300' BIT DEPTH
AND JOG IN 5-1/2"
- LOG TIE IN WITH +B' CORRECTION
-CLOSE EDC AND PASS THROUGH WINDOW
WITH NO PUMP WITH TF AT HIGH SIDE WITH
NO PROBLEM
- START PUMPING AT 1 BPM WITH 1900 PSI
AND STEER THROUGH BUILD SECTION AT 25
FPM
-AFTER BUILD AT 12,150' BRING UP PUMP
RATE T/ 2.88 BPM WITH 3950 PSI AND RIH T/
BOTTOM AT 25 FPM
- WITH THE +8' CORRECTION BOTTOM AT
12,950'
1430 - 1700 2.50 DRILL P 12.945.00 PROD1
DRILL 4.25' LATERAL FROM 12,950' MD TO
13,053' MD (8918' TVD)
- FREE SPIN: 4050 PSI, 2.89 BPM
- RATE: 2.89 BPM IN, 2.87 BPM OUT. CIRC
PRESSURE: 4100-4270 PSI
- MUD WEIGHT: 8.78 PPG IN, 8.68 PPG OUT,
WOB: 2-3K, ECD ON BOTTOM 10.47 EMW,
ECD AT WINDOW 10.3 EM W
- STUCK AT 13,053' MD AT 16:45
- RELAX PIPEAND SHUT DOWN PUMPS
-ATTEMPT TO PULL FREE THREE TIMES
- PLACE STRING IN NEUTRALAND PUMP
HI -VIS SWEEP
Printed 128/2019 11:24:33AM **All depths reported in Drillers Depths**
North America - ALASKA - BP Page 27 of 30
Operation Summary Report
Common Well Name: P-04 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2018 End Date. 1/3/2019 X3 -0197J -C: (2,351,407.001
Project: PBU Site: P
Rig Name/No.: CDR -2 Spud DataTme: 6/11/1991 12:00:OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum. KB @91.64usft (above Mean Sea Level)
Date From - To Hrs Task
Code NPT Total Depth
Phase Description of Operations
(hr) _
(usft)
_
17.00 - 21'00 4.00 DRILL
N 13,053.00
PROD1 STUCK AT 13,053
- CONTACT TOWN TEAM AND DEVELOP OCN
#8
- PREP TO PUMP CRUDE OIL
-DISPLACE SWEEP FROM WELL WITH
STRING IN NEUTRAL
- HOLD PJSM WITH CREW COVERING OCN
FOR PUMPING CRUDE
- CONFIRM LINE UP AND WALK FLOWPATH
- CONFIRM WEIGHT OF CRUDE AT 7.3 PPG
AND 3.5% LUBES IN ACTIVE MUD
- PULL STRING TO 20K OVER
- PUMP 10 BELS SPACER OF 3% KCL AT 2BPM
WITH 2600 PSI
- PUMP 60 BBLS 7.3 PPG CRUDE AT 2BPM
WITH 3370 PSI
- PUMP 10 BBLS SPACER OF 3% KCLAT 2BPM
WITH 3400 PSI
- CHASE WITH 8.7 PPG QUIKDRLIL-N WITH
3200 PSI
- AFTER 23 BBLS OF CRUDE OUT OF PIPE
STRING CAME FREE AT 19:30 HRS
- RECIPROCATE PIPE IN LATERALAND BRING
PUMP RATE UP TO 2.71 BPM IN WITH 2.55
BPM OUTAT 3870 PSI AND 9.8 EMW ECD
TIMING TO PUMP SECOND SPACER OUT OF
PIPE ON BOTTOM AND REMOVE CRUDE AND
KCL FROM WELL TO TIGER TANK
- ONCE SPACER ABOVE BHA RECIPROCATE
PIPE F/ 13,053' T/ 12,125' AT 25 FPM
- ALL CRUDE AND KCL OUT OF WELL PUMP
WEIGHTED HI -VIS SWEEP _
21:00 - 23:00 2.00 DRILL
N 13,053.00
PROD1 CLEAN UP WELLBORE AND TIE IN
- PUMP WEIGHTED HI -VIS SWEEP AT 2.93
BPM IN, 2.98 BPM OUT AT 3960 PSI
- LOG RA TAG WITH t5
- RIH BACK TO BOTTOM.
23:00 - 00:00 1.00 DRILL
P 13,053.00
PROD1 DRILL 4.25"LATERAL FROM 13053'MD TO
13096'
- FREE SPIN: 4037 PSI, 2.86 BPM
- RATE: 2.86 BPM IN, 2.97 BPM OUT. CIRC
PRESSURE: 4037-4479 PSI
- MUD WEIGHT: 8.79 PPG IN, 8.68 PPG OUT,
ECD: 10.44 PPG
- ROP: 105-140 FT/HR, WOB: 2.5 KLBS
FREQUENT PICKUPS
1/2/2019 0000 - 0200 2.00 DRILL
P 13,053.00
PROD? DRILL 4.25"LATERAL FROM 13096'TO 13242'
- FREE SPIN: 4037 PSI, 2.75 BPM
- RATE: 2.75 BPM IN, 2.62 BPM OUT. CIRC
PRESSURE: 4037-4479 PSI
- MUD WEIGHT: 8.79 PPG IN, 8.68 PPG OUT,
ECD: 10.55 PPG
- ROP: 105-140 FT/HR, WOB: 2.5-3.5 KLBS
- FREQUENT PICKUPS
Printed 1128/2019 11'.24.33AM "All depths reported in Drillers Depths'
North America - ALASKA - BP
Operation Summary Report
Page 28 of 30
Common Well Name. P-04
- PULL 30K OVER. NO LUCK.
AFE No
Event Type: RE-ENTER- ONSHORE(RON)
Start Date: 12/15/2018
End Date. 1/3/2019
X3 -0197J -C:(2,351,407.001
Project: PBU
Site: P
- PUMP 10 BBLS KCL SPACER
Rig Name/No.: CDR -2
Spud Date/Time: 6/11/1991 12:00.00AM
- PUMP 40 BBLS DEAD CRUDE
Rig Release:
Rig Contractor. NABORSALASKA DRILLING INC.
- PUMP 10 BBLS KCL SPACER
BPUOI: USA00001646
Active datum: KB @91.64usR (above Mean Sea Level)
Date From - To Him
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
13,242.00 PROD1
(usft)
_.
02:00 - 05:00 3.00
DRILL N
13,242.00 PROD1
DIFFERENTIALLY STUCK AT 13242'
Printed 1/28/2019 11:24:33AM •RAIZ depths reported in Drillers Depths**
- PULL 30K OVER. NO LUCK.
- PREPARE TO TO PUMP CRUDE. DISCUSS
MODIFICATIONS OF VOLUMES WITH ODE.
- PUMP 10 BBLS KCL SPACER
- PUMP 40 BBLS DEAD CRUDE
- PUMP 10 BBLS KCL SPACER
- PULL 20K OVER.
- PULLED FREE WITH 6 BBLS OUT.
- CONTINUE PUMPING CRUDE OUT.
05.00 - 06'30 1.50 DRILL P
13,242.00 PROD1
DRILL 4.25" LATERAL FROM 13242' TO 13369'
- FREE SPIN: 3838 PSI, 2.70 BPM
- RATE: 2.69 BPM IN, 2.65 BPM OUT. CIRC
PRESSURE: 3838 -4216 PSI
- MUD WEIGHT: 8.82 PPG IN, 8.70 PPG OUT,
ECP. 10.56 PPG
_
-ROP: 161 FT/HR, WOB: 2.5KLBS
06:30 - 08:00 1.50 DRILL N
13,369.00 PROD?
DIFFERENTIALLY STUCKAT 13369'
- PULL 30K OVER. NO LUCK
- PREPARE TO TO PUMP CRUDE
- DISCUSS VOLUMES WITH ODE
- 07:05 PUMP 10 BELS KCL SPACER
- PUMP 40 BELS DEAD CRUDE
-PUMP 10 BBLS KCL SPACER
HOLD 20_K OVER
0800 - 11:00 3.00 DRILL P
13,369.00 PROD1
- PULLED FREE WITH 17 BBLS OUT
'.- CONTINUE PUMPING CRUDE OUT
DRILLED 424' PERFORM LONG WIPER TO
WINDOW
.- PUMPA 10X10 LOW & HIGH VIS FOR THE
WINDOW
- JOG IN HOLE 100' FROM THE WINDOW AT 1
BPM
-PULLTHROUGH WINDOWAT 0.3 BPM AND
OPEN THE EDC
- CALLED IN 35 BBL CMT LOAD OUT TO SLB
KEITH AT 09:30
- POOH AT 4.0 BPM TO 11290'
- LOG TIE IN WITH A+7' CORRECTION AND
RIH
-SHUT DOWN PUMP, CLOSE EDC
-CLEAN THROUGH, BRING PUMP ONLINE AT
1.0 BPM THROUGH BUILD
11:00 - 15:40 4.67 DRILL P
_
13,369.00 PROD1
DRILL 4.25" LATERAL FROM 13242' TO 13369'
- FREE SPIN: 3950 PSI, 2.79 BPM
- RATE: 2.79 BPM IN, 2.69 BPM OUT. CIRC
PRESSURE: 3950-4430 PSI
- MUD WEIGHT: 8.83 PPG IN, 8.73 PPG OUT,
ECD: 10.66 PPG
- ROP: 100 FT/HR, WOB: 3.25 KLBS
- 13470' GEO WANTS TO HEADING DOWN AT
-120' TO TO AT -13600'
15'RO - 19:00 3.33 DRILL P
13,600.00_ PROD?
DRILLED TO PLAN TD PERFORM WIPER
TRIPS AS PER PLAN
-WIPER TO WINDOW
- JET TRAY AT 4.0 BPM. JET S-1/2"WITH 10
BELS HIVIS AND CHASE UP INTO 4-1/2" TAIL.
- RUN BACK TO WINDOW. ATTEMPT TO
CLOSE EDC. FAILED AT 20% CLOSED
Printed 1/28/2019 11:24:33AM •RAIZ depths reported in Drillers Depths**
North America - ALASKA- SP
Operation Summary Report
Common Well Name: P-04
- 0230
Event Type: RE-ENTER- ONSHORE (RON)
Project PBU------ --
Start Date: 12/15/2018
-Site :P
Rig Contractor: NABORSALASKA DRILLING INC.
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To His Task
(hr)
1900 - 0000 5.00 DRILL
Page 29 of 30
AFE No
End Date. 1/3/2019 X3-0197,1-0.(2,351,407,00)
Code NPT Total Depth
lush)
N 13,600.00
1/3/2019 0000
- 0230
2.50
DRILL
P
13,600.00
X02:30
- 03:45
1.25
DRILL
P
13,600.00
0345
- 0500
1.25
DRILL
N
13,600.00
0500
- 07.30
2.50
DRILL
N
I
13,600.00
0730
- 15'.45
6.25
DRILL
P
13,602.00
BPUOI: USA00001646
Phase Description of Operations
PROD1 MWD TROUBLESHOOT FAILURE. EDC
POSITION UNKNOWN. SHOWING 60%OPEN.
CIRCULATING PRESSURES SHOWING MORE
LIKELY JUST PARTIAL OPEN.
i - POOH FOR BHA
-2.78 BPM IN /2.29 BPM OUT 8.83 PPG IN/
8.75 PPG OUT. SLOW PUMP RATE WHEN
GOING BY JEWELRY.
-PERFORM JOG AT SURFACE. PERFORM10
MINUTE PUMP OFF FLOW CHECK. ^3 BPH
LOSS.
- PERFORM LUBRICATOR PURGE TO TIGER
TANK TO GET CRUDE OUT OF UPPER
LUBRICATOR FROM DIFFERENTIAL STICKING
EVENTS.
- BEGIN LAYING BHA DOWN.
PROD1 BHA LAID DOWN BY 00:30
MEASURE WALLTHICKNESS ON PIPE. 0.11
(42% WALL LOSS)
- CUT 25' COIL. INSTALL COIL CONNECTOR.
PULL TEST TO 50K GOOD TEST.
PROD1 INSTALL UQC AND FLOATS.
- PERFORM 250 PSI LOW / 3500# HIGH ON
COIL CONNECTOR /UQC
- PERFORM 3500 PSI TEST ON DUAL FLOATS.
GOOD TEST
PROD1 MAKE UP 4.25" DRILLING BHA#9
- PICK UP 2-718" ULS (1.0 DEG AKO) AND 3.0"
COILTRAK TOOLS
-MAKE UP 4.25" HYCALOG RERUN BICENTER
BIT AND RERUN AGITATOR.
- SURFACE TESTED TOOL. GOOD TEST.
- PRESSURE TEST QTS TO 250 PSI LOW FOR
5 MINUTES / 3500 PSI HIGH FOR 5 MINUTES
- INJECTOR ON: 04:30
PRODi RIH WITH DRILLING BHA TO LOGGING
DEPTH.
_ DISCONTINUE BHI NPT
PROD1 RIH WITH 4.25" DRILLING BHA
- LOG TIE IN
- CORRECT DEPTH -12' AND RIH
- TAG TO AT 13602' CORRECTED DEPTH
- POOH CHASING A HIGH VIS PILL TO THE
WINDOW
- PU TO THE WINDOW, JOG IN HOLE 100'
- PU TO THE WINDOW AND PULL THROUGH
AT 0.3 BPM
- ABOVE THE WINDOW SHUT DOWN PUMP
AND OPEN THE EDC
- POOH AT MAX RATE PUMPING PILLS TO
SURFACE
Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths"
North Ar renca -ALASKA - BP Page 30 of 30
Operation Summary Report
Common Well Name: P-04
AFE No
Event Type: RE-ENTER- ONSHORE (RON)
Start Date: 12/15/2018
Eno Date: 1/3/2019
X3 -0197J -C: (2,351,407 00 )
Project: PBU
Site: P
Rig Name/No.: CDR -2
Spud Date/Time: 6/11/1991 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
SPUD] : USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To Him
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(usR)
15.45 - 1730 1.75
DRILL P
13,602.00 PROD1
PILLS FROM TOOH ARE CLEAN VERY LITTLE
1730 - 1930
19.30 - 2200
2200'. - 0000
2.00
2.50
DRILL P
DRILL P
CUTTINGS
- 50' FROM SURFACE JOG IN HOLE
- NO INCREASE IN CUTTING
- TAG UP, RESET DEPTHS AND RIH AT MAX
RATE
- 9000' WHP AT 165 PSI, REDUCE RATE TO 3
BPM
- LOG TIE IN -10.5', CLOSE EDC
- RIH, BRING PUMP ON AT 1.0 BPM AFTER
THE WINDOW TO TD
- TAG AT 12093, SHUT DOWN PUMP, PU & TRY
AT 0.5 BPM AND PASSED THROUGH SHALE
13,602.00 PROD? DYNAMIC FLOW CHECK 10 MIN. GOOD
TAG TO, PU AND START LINER PILL WITH
BEADS
- LAID IN 8.6 PPG LINER RUNNING PILL WITH
11.5 PPG BEADS. TAILED WITH 10 BBLS OF
HIVIS SWEEP.
- PULL THROUGH WINDOW WITHOUT ISSUE.
- OPEN EDC. HI VIS AT EDC.
- PULL THROUGH 5-1/2" AT 40 FPM. PUMPING
X13.72 BPM.
13,602.00 PROD1 '- MUD WEIGHT: 8.82 PPG IN, 8.74PPG OUT
RATE: 3.73 BPM IN, 3.25 BPM OUT
- PAINT YELLOW FLAG AT 11035.70' BIT
DEPTH (10966.63' EOP)
- PAINT WHITE FLAG AT 8952.65' BIT DEPTH
(8883.58' EOP)
- PUMPED 15 BBL HIVIS SWEEP AT 4000'.
CHASED OUT OF HOLE. MINIMALSOUDS.
2.00 DRILL P 13,602.00 PROD1 MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
- INJECTOR OFF: 10:30
- LAV DOWN BHA#9.
Printed 1128/2019 11'.24:33AM "All depths reported in Drillers Depths"
Printed 1/28/2019 11:25.06AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 1 of 13
Operation Summary Report
Common Well Name: P-04
AFE No
Event Type: COM- ONSHORE (CON)
Start Date: 1/4/2019 End Date: 1/10/2019
X3 -0197J -C: (979,713.00)
Project PBU
Site: P
Rig Name/No.: CDR -2
Spud Date/Time: 6/11/1991 12ee00AM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To Hrs
Task
Code NPT Total Depth Phase
Description of Operations
(hr)
(usft)
1/4/2019 00:00 - 03:00 3.00
CASING
P 13,602.00 RUNPRD
PJSM, REVIEW STEPS FOR PREPARING
LINER.
- LO E -LINE. MWD REMOVE LOC. INSTALL
BOOT ON E -LINE.
- MAKE UP SINGLE JOINT OF 2-3/8" BTS -6.
- STAB ON WELL. PUMPAT4.5 BPM TO
PUMP SLACK OUT.
- PERFORM 3 CYCLES. E -LINE NO LONGER
MOVING
- PUMP 181' OF POSSIBLE 271' OUT.
- BOOT E -LINE. MAKEUP STINGER AND
NOZZLE
0300 - 0400 1.00
CASING
P 13,602.00 RUNPRD
PJSM FOR LAUNCHING DRIFT BALL.
-LOAD AND LAUNCH 7/8" DRIFT BALL.
- PRESSURE UP TO 3500#. DUMP. COME
ONDNEAT3.5BPM. BALLROLLING
- SHUT DOWN AND BREAKDOWN.
RECOVERED 7/8" STEEL BALL.
04.00 - 0600 2.00
CASING
P 13,602.00 RUNPRD
MAKE BOT X -OVER AND SWIVEL.
- RU ELEVATORS AND PREP RIG FLOOR TO
RUN SAFETY JOINT DRILLS WITH THE CREW
Printed 1/28/2019 11:25.06AM **All depths reported in Drillers Depths"
Common Well Name. P-04
Event Type: COM- ONSHORE (CON)
North America - ALASKA - BP Page 2 of 13
Operation Summary Report
Start Date 114/2019 End Date. 1/10/2019
AFE No
(979,713.00 )
Project: PBU Site: P
Rig Name/No.: CDR -2 Spud DatelTime. 6/11/1991 12:00:OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646
Active datum: KB @91.64us6 (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase Description of Operations
----- _ (hr) _ (usft) _ _
06:00 - 08:30 2.50 CASING P 13,602.00 RUNPRD PJSM FOR RUNNING LINER AND WALK
THROUGH ROLES & RESPONSIBILITIES
DRILL #1
WALK THROUGH KICK WHILE TRIPPING
DRILL WITH THE CREW STEP BY STEP ON
THE FLOOR
- FLOOR SAVER SET TO HIGH, ADJUST FOR
LATCHING PIPE
- HAD TROUBLE LATCHING UP THE
ELEVATORS, READJUST POSITION OF
SAFETY JOINT STICKING OUT OF THE
V -DOOR
HOLD AAR AND DISCUSS ISSUES
- MARKING THE SAFETY JOINT FOR THE
V -DOOR
- PUTTING A MARK ON THE MAST LEG FOR
WHERE TO STOP THE TOP DRIVE FOR
LATCHING UP
- MU THE CROSS OVER TO THE TUBING
STUMP, MT THREAD EASIER TO MU THAN
LINER THREADS
DRILL#2
- DRILLER STOPPED THE JOB TO HAVE THE
FLOOR HANDS STEP BACK LITTLE
FARTHER FROM THE RED ZONE ON THE RIG
FLOOR
- HAD PROBLEMS LATCHING UP THE
ELEVATORS
HOLD AAR AND DISCUSS
- PULL SAFETY JOINT TO THE SIDE TO GET IT
IN THE SLIPS OF THE ELEVATOR MAKES IT
EASIER TO LATCH
DRILL #3
- NO REAL ISSUES JUST A LITTLE STRUGGLE
TO GET THE ELEVATORS LATCHED UP
- STARTED MAKING UP THE DOG COLLAR
BEFORE THE WELL WAS SECURED, CLOSE
TIW VALVE BEFORE MU DOG COLLAR
- WELL SECURED IN 3:16
- DRILL COMPLETE WITH ALL IN POSTIONS AT
3:57
AAR
- MARK THE TIW VALVE WITH A LINE INLINE
WITH THE VALVE, IF FLUID IS COMING OVER
THE TOP IT WILL BE DIFFICULT TO TO FIND
THE KEY HOLE TO CLOSE THE VALVE
DRILL #4
- NO ISSUES LATCHING ELEVATORS
- WELL SECURED IN 2:37
- DRILL COMPLETE WITH ALL IN POSTIONS AT
3:55
AAR
- DRILL WENT WELL, NO REAL ISSUES
- STOP TO TAKE PICTURES OF WHERE THE
Printed 1/28/2019 11:25:06AM "All depths reported in Drillers Depths`"
North America - ALASKA - BP
Operation Summary Report
Page 3 of 13
Common Well Name: P -D4
AFE No
Event Type: COM- ONSHORE(CON)
Start Date. 1/4/2019 End Date: 1/10/2019
X3 -0197J -C'.(979,713.00)
Project: PBU — --- _
Site: P
Rig Name/No.: CDR -2
Spud DaterTime: 6/11/1991 12:00 OOAM
Rig Release.
Rig Contractor: NABORSALASKA DRILLING INC.
BPUO1 USA00001646
Active datum: KB @91.64usft (above Mean Sea Level
Date From - To
Him Task Code NPT Total Depth Phase
Description of Operations
(hr)_ - (usft)
-
CREW MEMBERS ARE TO STAND DURING
PIPE OPERATIONS
0830 - 0900
0.50 CASING P 13,602.00 RUNPRD
CREW CHANGE
0900 - 11:00
2.00 CASING P 13,602.00 RUNPRD
PJSM WITH ON COMING CREW TO RUN
LINER AND CONDUCT WELL CONTROL
DRILLS BEFORE MU LINER
DRILL #1
WALK THROUGH KICK WHILE TRIPPING
DRILL WITH THE CREW STEP BY STEP ON
THE FLOOR
- REVIEW AAR'S FROM PREVIOUS CREW
- WALKTHROUGH DRILL FOLLOWING
I
STANDING ORDERS STEP BY STEP
-LOOKED AT THE ELEVATOR LATCH UPAND
'MADE ADJUSTSMENTS FOR WORKING IN
THEIR GREEN ZONE
AAR
- CREW IS GOOD WITH THE STANDING
ORDERS
DRILL #2
- PERFORM KWT DRILL
- DRILLER DIRECTED THEM THROUGH EACH
STEP OVER THE RADIO AND WENT WELL
HOLD AAR AND DISCUSS
NO DEFICIENCIES
DRILL #3
- ELEVATOR LATCH WENT SMOOTH
- WELL SECURED IN 2:02
- DRILL COMPLETE WITH ALL IN POSITIONS
AT 3:46
AAR
- FLOOR HAND FORGOT TO TAKE THE 4 GAS
METER TO THE CELLAR
DRILL #4
-NO ISSUES LATCHING ELEVATORS
- WELL SECURED IN 2: 00
- DRILL COMPLETE WITH ALL IN POSTION AT
342
AAR
- NO DEFICIENCIES TO REPORT
DISCUSS CREW DRILL PROFICIENCY WITH
WSUP, GOOD TO PROCEED WITH LINER OPS _
11:00 - 11:30
0.50 CASING P 13,602.00 RUNPRD
BOT CHANGED OUT, HOLD A PJSM TO
REVIEW BOT LINER PROCEDURE TO MU
LINER
WALK THROUGH LINER LAYOUT WITH BTT
_REP____ _
11:30 - 16:15
4.75 CASING P 13,602.00 RUNPRD
MU LINER ASPER APPROVED SUMMARY
-FILL FIRST 5 JOINTS AS PER NABORS LINER
RUNNING PROCEDURE THEN EVERY 10
JOINT
- 15:00 ALL 2-7/8 RAN, VERIFY PIPE COUNT IN
PIPE SHED, GOOD
Printed 1/28/2019 11:25:06AM **All depths reported in Drillers Depths**
North America - ALASKA - BP
Operation Summary Report
Page 4 of 13
Common Well Name: P-04
- 0000
2.00
AFE No
Event Type: COM- ONSHORE(CON)
Start Date. 1/4/2019
End Date: 1/10/2019
X3 -0197J -C:(979,713,00)
Project: PBU
Site: P
4.83
CASING P
Rig Name/No.: CDR -2
Spud Date/Time: 6/11/1991 12:00:00AM
Rig Release:
Rig Contractor: NABORSALASKA DRILLING INC.
- FILL PIPE WHILE SWAPPING ELEVATORS
BPUOI: USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
JOINTS OF 2-3/8" PH6.
Date From - To Him
Task Code NPT
Total Depth Phase
Description of Operations
(hr)
(us%)
16:15 - 17:00 0.75
CASING N
13,602.00 RUNPRD
RAN FIRST JOINT OF 3-1/4" IN AND THE DRAW
17:00 - 22:00 5.00 CASING P
2200
- 0000
2.00
CASING P
1/5/2019 00:00
- 01:00
1.00
CASING P
01:00
- 05:50
4.83
CASING P
0550 - 0710 1.33 CASING N
Printed 1/28/2019 11:25:06AM "All depths reported in Drillers Depths"
WORKS WILL NOT MOVE
STAB TI W VALVE AND WAIT FOR
ELECTRICIAN. DRAW WORKS REPAIRED,
'GRID RESISTOR PROGRAMMING ISSUE.
13,602.00
RUNPRD CONTINUE LINER OPS
-RUN REMAINING 3-1/4" LINER.
-MAKE UP 6 JOINTS OF 34/2" ST -L WITH THE
3 PUPS.
- FILL PIPE WHILE SWAPPING ELEVATORS
- MAKE UP LINER RUNNING TOOLAND6
JOINTS OF 2-3/8" PH6.
-CREWCHANGE
13,602.00
RUNPRD RUN LINER ON COIL
- PRESSURE TEST QTS TO 250 PSI LOW FOR
5 MINUTES 13500 PSI HIGH FOR 5 MINUTES
— INJECTOR ON: 22:00
- MUD WEIGHT: 8.74 PPG IN, 8.76 PPG OUT
- RATE: 0.35 BPM IN, 0.44 BPM OUT. CIRC
PRESSURE: 1408 PSI
13,602.00
_ _
RUNPRD RIH TO WHITE WINDOW FLAG AT 11433.91',
MAKE CORRECTION TO 11419.04' FOR A
.-14.87'CORRECTION.
COMEOFFUNE. PERFORM PICKUP AT 30
FPM AT 53K. RIH WEIGHT AT 23K
PERFORM PICKUP. 5' FOOT FROM
COMPRESSION TO TENSION.
COME BACK ONLINE AT MIN RATE THROUGH
WINDOW
TOTAL MUD LOSSES DURING TRIP TO
WINDOW 1_8 BBLS.
13,602.00
RUNPRD WORKING LINER TO BOTTOM
- START SETTING DOWN AT 12574' START
WORKING LINER.
- LOSING GROUND.
- PUMP 10 BBLS KCL SPACER
- PUMP 20 BBLS LVr
- PUMP 10 BBLS KCL SPACER
- ONCE KCL SPACER OUT, WORK DOWN TO
12730'.
-CONTINUE WORKING LINER WHILE LVT
COMING OUT SHOE
13,602.00
RUNPRD PULLING HEAVY, RIH TRY TO WORK DOWN
I
SINCE WE GOT STUCK COMING UP
- NOTABLE TO WORK DOWN, FINISH
CIRCULATING OUT MINERAL OIL THEN TRY
WORKING PIPE
- RETURNS ARE 1: 1
Printed 1/28/2019 11:25:06AM "All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 5 of 13
Operation Summary Report
Common Well Name: P-04
AFE No
Event Type: COM -ONSHORE (CON) Start Date: 1/4/2019 End Date: 1/10/2019
X3 -0197J -C: (979,713.00)
Project: PBU Site: P
Rig Name/I CDR -2 Spud Daterrime: 6/11/1991 12:00:OOAM
Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase
Description of Operations
_ (hr) (usft)
07:10 - 08'.40 1.50 CASING P 13,602.00 RUNPRD
LVT OUT REDUCE THE RATE TO 0.25 AND
START WORKING PIPE
- SET DOWN -15K, PU TO 87K AND PULLED
FREE
- PULLING HEAVYAT 12457'
- PULLING CLEAN TO 12265' REDUCE RATE
TO 0.2 BPM AND RIH
- SET DOWN AT 12500', FROM 19K TO 10K, NO
MOVEMENT, SHUT DOWN PUMP, NO
MOVEMENT
- PU TO BREAK OVER AND +5', PU IS CLEAN,
RIH AND RAN PAST, BRING PUMP ON AT 0.15
BPM
- SET DOWN AT 12573, SHUT DOWN PUMP,
NO MOVEMENT, SHUT DOWN PUMP, NO
MOVEMENT
- PU TO 78K AND MOVING, RIH AND SAT
DOWN AT 12574', ONLINE AT 0.7 BPM
- SHUT DOWN PUMP, NO MOVEMENT, PU TO
72K+5', RIH AND RAN PAST CLEAN, ONLINE
AT 0.15 BPM
- SET DOWN AT 121 SHUT DOWN PUMP,
PU TO 73K, RIH
- SET DOWN AT 12807', ONLINE AT 0.75 BPM
AT 1874 PSI
- SHUT DOWN PUMP, PU TO 72K+5'AND RSH,
RAN PAST 12821'
- SET DOWN AT 12873', SHUT DOWN PUMP,
PU TO 70K+5' AND RIH,
0840 - 0900 0.33 CASING N 13,602.00 RUNPRD
NOT MAKING ANY MORE FOOTAGE, LINER UP
TO PUMP 40 BBLS OF MINERAL OILAS PER
OCN #10 FOLLOWED BY KCLAND DISPLACE
WELL TO KCL
09:00 - 10:40 167 CASING N 13,602.00 RUNPRD
ONLINE TO PUMP MINERAL OIL PILL
- 10 SPACER / 40 MINERAL OIL/ 10 SPACER
FOLLOWED BY KCL TO DISPLACE THE WELL
- PU 5' EVERY 5-10 MINUTES VERSE PUH
WHILE CIRCUALTING PILL DOWN AND
LOOSING GROUND
- PICKING UP EVERY 5-10 WE ARE SEEING
5-15K OVER PULL BUT WE ARE MOVING
FREELY
1040 - 13'.00 2.33 CASING P 13,602.00 RUNPRD
KCLAT THE SHOE, PU 68K CLEAN, RIH TO
TRY WORKING DOWN
- STACKING OUT, PU AND PULLED TO 88K,
PUMP OUT KCLAND 2 BELS OF MINERAL OIL,
SHUT DOWN AND SEE IF WE CAN MOVE
- PULLED TO 74K AND POPPED FREE
- 7 BBLS OF MINERAL OIL OUT AND WE ARE
NOT MAKING ANY HOLE
- PUH 100' TO 12730 AND ALLOW MINERAL OIL
TO SOAK WHERE WE CAN'T GET PASTAT
12845'
- NABORS CREW CHANGE
- RIH AT 30 FPM FROM 12730'
- MADE IT TO 12918', PU TO BREAK OVER AND
RIH
- MADE IT TO 13009', PU TO BREAK OVER AND
RIH, SET DOWN SAME DEPTH, PUMP 3 BBLS
LVT
- PU CLEAN RIH, SET DOWN, PU AND WE ARE
HUNG UP, PUMP 3 BBLS OF LVT
Printed 1/28/2019 11.25.05AM `"All depths reported in Drillers Depths"
North America - ALASKA - BP Page 6 o/ 13
Operation Summary Report
Common Well Name: P-04 AFE No
Event Type: COM- ONSHORE (CON) Start Date: 1/4/2019 End Date. 1/10/2019 X3 -0197J -C'. (979,713.00)
Proiect: PBU Site: P
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
III (usft)
13:00 - 14:15 1.25 CASING P 13,602.00 RUNPRD PULLED FREE, PU AND PUMP 4 BBLS LVT,
Printed 1/28/2019 11:25:06AM **All depths reported in Drillers Depths**
SOAK FOR 5 MIN THEN TRY WORKING DOWN
I
SET OWN AT 12845, PU TO BREAK
ORIH
AND
RAN PAST 12945, SET OWN AT 12997'. PU
DH99FPUAND
9
SET DOWN SAME EE, PUMP
BBLSWHILE
IL
TDOWNARIH
RHN04
MOVEMENT, WORK PIPE AND GOT FREE
- CIRCULATE THE REST OF THE MINERAL OIL
_
OUT AND TRY WORKING DOWN_AGAIN
1415 - 1440 0.42 CASING N
13,602.00 RUNPRD
WE HAVE EXHAUSTED ALL ATTEMPTS WITH
LVT, CALL WSUPT 8 ODE AND DISCUSS
PUMPING THE KCL INTO THE WELLBORE AND
TRY WORKING PIPE _
14.40 - 1600 1.33 CASING N
___
13,602.00 RUNPRD
PUMPED 30 BBLS OF KCL OUT, TRY
WORKING PIPE
- NOTABLE TO MOVE AFTER 4 CYCLES, PULL
INTO TENSION AND PUMP KCLALLTHE WAY
AROUND
- CALL TOWN TEAM AND DISCUSS
1600 - 18:00 2.00 CASING N
13,602.00 RUNPRD
DECISION MADE TO SWAP WELL BACK OVER
TO MUD, RELEASE FROM LINER AND POOH
TO TEST BOPE
18.00 - 18:30 0.50 CASING N
13,602.00 RUNPRD
PJSM, REVIEW CON #11 WITH CREW
MEMBERS
- PERFORM 10 MIN FLOW CHECK.
- LOAD AND LAUNCH 3/4" STEEL BALL.
- SLOW PUMP RATE FROM 3 BPM TO 1 BPM
AT 34 BBLS AWAY.
- 47 BBLS AWAY BALL LANDED. INCREASE
TRIPS. PRESSURE UP TO 3300# AND
SHEARED BALL SEAT.
- CIRCULATE AT 0.5 BPM WHILE PULLING OUT
OF LINER. GOOD INDICATION OF STINGING
OUT CLEAN. 48KBREAKOVER.
-ONCE 30' OUT OF LINER. INCREASE RATE
TO 2.5 BPM
1830 - 2030 2.00 CASING N
13,602.00 RUNPRD
POOH
- MUD WEIGHT: 8.67 PPG IN, 8.66 PPG OUT
- RATE: _2.51 BPM IN, 2.01 BPM OUT
20:30 - 23:30 3.00 CASING N
13,602.00 RUNPRD
MONITOR WELL FOR 10 MINUTES AT BHA:
STATIC
- INJECTOR OFF: 20:45
-BREAK OFF SWIVEL AND TROLLEY BACK
INJECTOR.
- LAY DOWN 6 JOINTS OF 2-3/8" BTS -6.
- LAY DOWN LINER RUNNING TOOL.
RECOVER 3/4" STEEL BALL
- WIPER PLUG INACT.
-LOSS RATE: 0.5 BBL PER HOUR. CLOSE
MASTER VALVE _
23:30 - 00:00 0.50 BOPSUR P
13,602.00 RUNPRD
PREP FOR 14 DAY BOPE TEST
- INSTALL TEST RISERS
- VALVE CREW GREASED TREE VALVES.
- FLUID PACK FOR SHELL TEST AGAINST
MASTER VALVE
-AOGCC WITNESS WAIVED BYADAM EARL
- PERFORM 250 PSI LOW SHELL TEST / BEGIN
3500# HIGH SHELL TEST.
Printed 1/28/2019 11:25:06AM **All depths reported in Drillers Depths**
Common Well Name: P-04
Event Type'. COM- ONSHORE(CON)
Project: PBU
North America - ALASKA - BP Page 7 of 13
Operation Summary Report
Start Date: 1/4/2019 Ead Date 1/10/2019
Site: P
AFE No
X3 -0197J -C. (979,713.00 )
Rig Name/No.: CDR -2 Spud Datefrime: 6/11/1991 12:00 OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
Dale From- To
Him
Task
Code NPT Total Depth
Phase
Description of Operations
(hr) _
_
(usft)
1/6/2019 00:00 - 02:15
2.25
BOPSUR
P 13,602.00
RUNPRD
BOPE TESTING
-3500 PSI SHELL TEST PASSED.
- BOPE COMPONENTS ALL TESTED TO 250
LOW/ 3500# HIGH
- PERFORM TEST#1: BLINDS, R7, BLIA, Bi,
B4 ALLPASSED
- INSTALL TEST JOINT FOR 2-3/8" EQUIPMENT
-PERFORM TEST#2: ANNULAR (2-318"),
TIW#1, B3, B2, BL1 ALL PASSED
-PERFORM TEST #3 UPPER 2-3/8" PIPE
SLIP, TIW#2, BL2, R2, T2, C15 ALL PASSED
'- PERFORM TEST Its: C16, T7, C11 ALL
PASSED
02:15 - 0225
0.17
BOPSUR
P 13,602.00
RUNPRD
FILL HOLE
-CLOSE SWAB
- LINE UP DOWN MANAGE PRESSURE LINE.
- OPEN MASTER VALVE. WELLBORE DEAD.
FILL HOLE WITH 1 BBL. _
02.25 - 0400
1.58
BOPSUR
P 13,602.00
RUNPRD
BOPE TESTING
- PERFORM TEST #5: VARIABLES (2-3/8"), C7,
C9, C10, TV2 ALL PASSED
- PERFORM TEST #6: LOWER 2-3/8" PIPE /
SLIP, C5, C6, C8, TVI ALL PASSED
- PERFORM TEST #7: CHOKE A, CHOKE C
- PERFORM ACCUMULATOR DRAW DOWN
TEST 2950# 12250# 17 SEC TO 200# 147 SEC
TO FULL RECOVERY.
0400 - 0500
1.00
BOPSUR
P 13,602.00
RUNPRD
BOPE TESTING
- INSTALL 0.9' SPACER SUB FOR 3.5" TEST ON
ANNULAR AND VARIABLES
- PURGEAIR OUT OF SYSTEM
- PERFORM TEST #8: ANNULAR (3.5"), Cl, C4
ALLPASSED
- PERFORM TEST #9: VARIABLES (3.5"), C2, C3
ALLPASSED
- OPEN MASTER VALVE. FILL HOLE
THROUGH MANAGE PRESSURE LINE (2.1
BBLS)_ _
05:00 - 06:30
1.50
BOPSUR
P 13,602.00
RUNPRD
RECONFIGURE RISERS FOR TEST#10
-CHANGE PACKOFFS DUE TO RUNNING
FOOTAGE.
-PERFORM TEST#10: INNER REELVALVE,
PACK OFF, C9 & C10 & LUBRICATORS- ALL
PASSED
0630 - 0730 1.00 BOPSUR P 13,602.00 RUNPRD BOP TEST COMPLETED, RD TEST
EQUIPMENTAND LINE UP TO OPEN UP TO
THE WELLTO CHECKFOR PRESSURE
07:30 - 08:00 0.50 BOPSUR P 13,602.00 RUNPRD OPEN UP TO THE WELL
- OPEN SWAB TO A CLOSED CHOKE TO
CHECK FOR PRESSURE
- NO PRESSURE, OPEN CHOKE, ONLINE
WITH PUMP TO ENSURE THE WELL IS FULL
TO FLOW CHECK
- WELL TOOK 1.2 BBLS, SHUT DOWN PUMP
ADN FLOW CHECK WELL
- GOOD NO FLOW CHECK
- PU INJECTOR AND MOVE BACK
Printed 1128/2019 11:25:06AM **All depths reported in Drillers Depths"
Common Well Name: P-04
Event Type. COM- ONSHORE (CON)
North America - ALASKA - BP Page 8 of 13
Operation Summary Report
Start Date: 1/4/2019
End Date: 1/10/2019
AFE No
X3 -0197J -C'. (979,713 00 )
Project: PBU Site: P
Rig Name/No.: CDR -2 Spud Daterfime: 6/11/1991 12:OO:OOAM Rig Release:
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To Him Task Code
_ (hr)
08:00 - 13:30 5.50 FISH N
13:30 - 16:40 3.17 FISH N
16:40 - 16:55 0.25 FISH N
L_
16:55 - 17:05 0.17 FISH N
17'.05 - 21:30 4.42 FISH P
21'.30 - 00:00 2.50 FISH N
BPUOI:
NPT Total Depth
Phase Description of Operations
(usft)
13,602.00
RUNPRD PREP SAFETY JOINT FOR RUNNING THE
FISHING BHA
- HOLD A PJSM TO MU THE BHA- REVIEW
PROCEDURE AND DISCUSS RED ZONE
,MANAGEMENT
-MU FISHING BHA
-RIH WITH FISHING BHA W/SEALASSEMBLY
-MIX EP MUD LUBE PILL WHILE RIH
-AT 10600' VERIFY WE ARE NOT LATCHED
ON, PU IS CLEAN AT 47K NO PUMP,
'CONTINUE PUMPING EP MUD LUBE PILL
;- VERIFY RATE FOR PILLAT 2.5 BPM ONCE
ITS ON THE BACKSIDE FOR OPTIMAL
COATING
SEND EP LUBE PILLTO TT
13,602.00
RUNPRD START FISHING OPS
- RIH AT 0.5 BPM AT 25 FPM LOOKING FOR
PRESSURE INCREASE -TOL AT 0.5 BPM AT
1025 PSI
- TAG TOL RIGHT WHERE WE LEFT IT,
CORRECT DEPTH -9' TO 12966'
- PU AND PULLED LINER FREE AT 77K AND
ITS MOVING -61K STRING WF
- RIH AT SET DOWN AT 12996, PU AND SET
DOWN AT 12988, PU AND CAN'T MOVE
- SLACK OFF AND PU SAME PULLING 90K
- SLACK TO RIH WF AT 20K AND CIRC 10 BELS
AT 2 BPM
- PU AND WE ARE STUCK, SLACK OFF TO 70K
AND HOLD, WE SEEING THE SAME
CHARACTERISTICS WE WERE SEEING
YESTERDAY, CALL ODE AND DISCUSS FLUID
OPTIONS _
13,602.00
RUNPRD RECIEVED CON FOR PUMPING CRUDE, MOVE
OUT LVT PUPS AND BACK IN CRUDE
TRANSPORT
13,602.00
RUNPRD HOLDA PJSM TO PUMP CRUDEAS PER CON
_ #12 _
13,602.00
RUNPRD FLOOD LINES AND PUMP 60 BBLS OF CRUDE
- PU TO CHECK LINER AND WE ARE FREE,
RIH TILL WE SET DOWN TO KEEP TEH GS IN
COMPRESSION
- STOPPED AT 12975' -20' OFF BOTTOM
- ONLINE WITH 10 BBLS OF KCL FOLLOWED
BY 60 BBLS OF CRUDE AND 10 BBLS OF KCL
- PUMP 20 BBLS OF CRUDE OUT SHOE. SHUT
PUMPS DOWN. RELAX HOLE FOR 20 MIN
-POPPED FREE. CHASED DOWN TO 13108',
GO INTO COMPRESSION. PUMP 5 BBLS
MORE OUT SOAK
-PUANDRUNT013132'. SETDOWN. PUA
COUPLE TIMES LOSING GROUND PUMP 10
MORE BBLS OUT. - PU AND LOSING
GROUND. PUMPANOTHER 10 BBLS OUT.
WORK LINER. PUMP ANOTHER 10 BBLS OUT.
- PU AND CONTINUE TO WORK LINER. PUMP
FINAL 5 BBLS OUT.
13,602.00
RUNPRD DISCUSS OPTIONS WITH ODE.
- SWAP TO NEW DRILLING MUD
- CIRCULATE CRUDE AND OLD MUD TO TIGER
TANK.
Printed 1/282019 11:25:OBAM **All depths reported in Drillers Depths"
North America - ALASKA - BP Page 9 of 13
Operation Summary Report
Common Well Name. P-04
- 1830
2.50
AFE No
Event Type: COM- ONSHORE (CON)
Start Date. 1/4/2019
End Date: 1/10/2019
X3 -0197J -C: (979,71100)
Project: PBU
Site: P
FISH
P
Rig Name/No.: CDR -2
Spud Date/Time: 6/11/1991 12:00
OOAM
Rig Release:
Rig Contractor. NABORS ALASKA DRILLING INC.
BPUOI: USA00001646
Active datum: KB @91.64us8 (above Mean Sea Level)
FISH
Date From - To Hrs
Task Code NPT
Total Depth Phase
Description of Operations
_ (hr)
P
(usft)
13,602.00
1(//2019 00:00 - 01:00 1.00
FISH N
13,602.00 RUNPRD
FINISH MUD SWAP
01:00 - 09:45
6.75
09:45 - 1230 2.75
12:30 - 15:40 3.17
15:40 - 16:00 0.33
16'.00
- 1830
2.50
1830
- 1930
1.00
19:30
- 22:00
2.50
FISH
P
13,602.00
RUNPRD
13,602.00
RUNPRD
FISH
P
1
FISH
P
13,602.00
RUNPRD
FISH
P
13,602.00
RUNPRD
FISH
F,
/hBrG .00
RUNPRD
V�'✓,
13,602.00
FISH
P
RUNPRD
CEMT
P
13,602.00
RUNPRD
Printed 1/28/2019 11:25:06AM **All depths reported in Drillers Depths**
8.62 PPG IN / 8.53 PPG OUT
PU TO 87K. LINER PULLED FREE. START
WORKING LINER.
WORK LINER
- RATE: 3.0 BPM IN, 3.0 BPM OUT. CIRC
PRESSURE: 3512 PSI
- MUD WEIGHT: 8.53 PPG IN, 8.53 PPG OUT
-CIRCULATE OPEN HOLE VOLUME IN
COMPRESSION. PICKUP AND STARTING TO
MOVE FORWARD SLOWLY. CONTINUE
WORKING PIPE AND CIRCULATING AT 3 BPM
TO SLOWLY GAIN GROUND MOVING LINER.
- PUMPA 10 BBL HIGH VIS PILL
- PILL DID NOT BRING UP ANYTHING
MADE IT DOWN TO 13367' LINE UP TO PUMP A
20 BBL LVT PILL
-ONLINE WITH 10 BBLS SPACERS AND 20
BBLS LVT
- 5 BBLS OF LVT OUT, ALLOW TO SOAK FOR A
FEW MINUTES THEN TRY WORKING PIPE
- PU AND RAN IN HOLE TO 13480' AND
STOPPED THEN POPPED FREE, RIH TO 13511'
AND SET DOWN.
- PU TO 13500' FLAG AND VERIFY DEPTH AT
1348966'(l. 3499.37' WHEN IT WAS PAINTED)
-STOPPED MAKING HOLE AT 13536', PUMP 5
BBLS OF LVT
- STOPPED AT 13568, PU AND WORK DOWN
- NOT GETTING ANY DEEPER, CIRC OUT 2
BBLS
- NO IMPROVEMENT, CIRC OUT THE LAST 6
BBLS
- 11 ATTEMPTS TO GET ANY DEEPER HAS
FAILED, CALL ODE AND DISCUSS
CIRC OUT LVT
LVT CIRCULATED OUT, PU TO 90K AND TO
PULL LINER FREE
- WORK PIPE FEW TIMESAS DISCUSSED
WITH ODE, IF WE DO NOT MAKE ANY
PROGRESS, PUMP OFF AND POOH
- TAGGING AT 13543, WORK PIPE BACK
DOWN TO 13570, PUMP OFF AND POOH
- SLID DOWN T TO 13546', ALLOW TIME TO
RE _
MADE IT BACK DOWN TO 13569 PUMP OFF
LINER AND POOH
AT SURFACE. PERFORM 10 MIN FLOW
CHECK._
LAY DOWN 6 JOINTS 2-3/8" BTS -6
LAY DOWN G SPEAR.
CLEAR RIG FLOOR.
- PREP FOR RUNNING 1-1/4" CSH
WORKSTRING
- INSTALL BOT INTERNAL COIL CONNECTOR.
PULLTESTTO40K, PRESSURETESTTO
3500#.
-SWAP ALL HANDLING EQUIPMENT TO 1-1/4"
North America - ALASKA - BP
Operation Summary Report
Page 10 of 13 1
Common Well Name. P-04 AFE No
Event Type: COM- ONSHORE (CON) Start Date. 1/4/2019 End Date: 1/10/2019 X3 -0197J -C: (979,713.00 )
Project: PBU Site: P
Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:0O:OOAM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646
Active datum: KB @91.64usft (above Mean Sea Level)
Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations
(hr) _ - (usft)
22:00 - 00:00 2.00 CEMT P 13,602.00 RUNPRD PJSM FOR RUNNING CEMENT RETAINER BHA
- MAKE UP WFR FH CEMENT RETAINER
- MAKE UP S/8" BALL DISCONNECT TO FIRST
JOINT OF 1-1/4" CS
- RUN 23 JOINTS OF 1-1/4" CSH WORKSTRING
1/8/2019 00:00 - 03:00 3.00 CEMT P 13,602.00 RUNPRD CEMENT RETAINER ON WORKSTRING
-MAKE UP REMAINING 27 JOINTS OF 1-1/4"
li CSH HYDRIL WORKSTRING
- MAKE UP 6 JOINTS OF 2-1/16
_ -MU SWIVEL
03:00 - 07:00 4.00 CEMT P 13,602.00 RUNPRD BHA MU, RIH AND CALL OUT SLB CMT CREW
11000'WT CK=45K, RIH WT = 20k
- CLEAN PASS THROUGH TOL
- STOP AT YELLOW FLAG (ORIGINAL DEPTH
10966.63') OUR DEPTH = 10969.5', -3.2'
'CORRECTION
- ELEC DEPTH 12753.21' (-26.65'
CORRECTION)
RIH TO LATCH COLLAR AND CORRECT TO IT
-13533'
I� t A - 22.5K, RIH TO
LIGHTLYG LATCH COLLAR
G 1 - TAG LATCH COLLAR AT 13573', PU AND
RETAG SAME DEPTH. UP WT AT 13567', PU 20'
AS PER OCN FOR SET DEPTH
07:00 - 10:30 3.50 CEMT P 13,602.00 RUNPRD - AT SET DEPTH, LOAD CONFIRMED 1/2"
ALUMINUM BALLAND LAUNCH
- REDUCE RATE AT 45 BBLS TO ALLOW BALL
TO LAND ON SEAT
- NO INDICATION OF BALL ON SEAT AT
VOLUME, SURGE PUMP A COUPLE TIMES
AND CONTINUE PUMPING AT 1.0 BPM
- NO INDICATION OF THE BALL LANDING ON
SEAT AND SHEARING
- WED RECOMMENDS TRY SETTING DOWN
WT TO SEE IF THE TOOL IS SET, DISCUSSED
WITH ODE AND OK
- SET DOWN SK PAST RIH WT, STOPPEDAND
WT CAME BACK TO RIH WT, TRY TO SET
DOWN WT AGAIN BUT STOPPED AS IT LOOKS
LIKE WE ARE PUSHING IT DOWN
- PU TO SEE IF WE SEE AN OVER PULL AND
PULLED TO 54K (4K OVER) AT 13548.6) 1.6'
SHALLOWER
CALL ODE AND DISCUSS
10:30 - 14:00 3.50 CEMT P 13,602.00 RUNPRD DECISION MADE TO PUMP 2ND BALL
- LOAD AND PUMP 2ND CONFIRMED 1/2"
ALUMINUM BALL.
-COME ONLINE. PUMP 62 BBLS, BALL
LANDED ON SEAT, AND SHEARED AT 3000#
TACK 10K ON RETAINER. GOOD SET.
- CIRCULATE MUD OUT OF LINER ANNULUS.
- SLIP STREAM CEMENTERS KCL FOR PT. PT
CEMENTERS TO 250 LOW / 4700# HIGH
Printed 1/2811019 11:25:06AM **All depths reported in Drillers Depths**
Common Well Name. P-04
Event Type: COM- ONSHORE (CON)
North America - ALASKA - BP
Operation Summary Report
Start Date. 1/4/2019 End Date: 1/10/2019
Page 11 of 13
AFE No
K3 -0197J -C: (979,713.00 )
Project: PBU Site: P
Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:00 OOAM Rig Release:
Active datum: KB @91.64usR (above Mean Sea Level)
Date From - To Hrs
(hr)
14:00 - 18:00 4.00
BPUOI: USA00001M
Task Code NPT Total Depth
Phase Description of Operations
(usf)
_
CEMT P 13,602.00
RUNPRD PERFORM LINER CEMENT JOB
- 1.51 BPM IN / 1.51 BPM QHTAT 1317 PSI
-CEMENT WE AT 1337
- LOAD 28.5 BBLS OF 15.3 PPG CEMENT.
-CHASE WITH 5 BBLS OF HIVIS
- FOLLOW WITH 1.5 PPG EXHAUST PILL.
:-ZERO OUT MM AND TAKE TO DEDICATED
PITAT 61.3 BBLS AWAY (CEMENT AT SHOE)
- 1.65 BPM IN / 1.83 SPM OUT AT 2800-3650#
yy
l V��
LL
L r PUMP 26.6 BBLS BEHIND PIPE CEMENT IN 4f
1800 - 21.45 3.75 CEMT P
21'.45 - 0000 2.25 PERF P
1/92019 00'.00
- 0045
00'.45
- 02:45
02.45
- 04:00
0.75 PERF P
2.00 PERF P
1.25 PERF P
Printed 1/28/2019 11:25:OSAM **All depths reported in Drillers Depths"
PLACE AT 1500
COME OFFLINE. UNSTING FROM CEMENT
RETAINER WITH 2 BBLS CEMENT IN COIL
- COME ONLINE 3.06 BPM IN / 3.03 BPM OUT
AT 3621#. ONCE EXHAUSTED CEMENT
ABOVE LINER START Put nNr, o, T nc --
HOLE.
-SEEN 10 PPG SLUG OF CEMENTAT
VOLUME. CAMEANDGONE.
-JET DEPLOYMENT SLEEVE AT 30 FPM.
CIRCULATE 2.87 BPM 12.45 BPM OUT 3600#
SPOT FRESHWATER IN WORKSTRING
13,602.00 RUNPRD
PERFORM 10 MIN FLOWCHECK
- INJECTOR OFF AT 18:15
- BREAK AT NS SWIVEL
- LAY DOWN 6 JOINTS OF 2-1/16" CSH, XO,
3/4" DISCONNECT, XO
- LAY DOWN 50 JOINTS OF I-1/4"CSH
- FH RUNNING TOOL (RECOVERED (2) 1/2"
ALUMINUM_ BALLS.
13,602.00 OTHCMP
PJSM WITH HALUBURTON TCP
- LOAD GUNS INTO PIPE SHED.
- LOAD HALLIBURTON HANDLING EQUIPMENT
TO RIG FLOOR
- PUT PERF GUNS IN ORDER
SIMOPS: ATTEMPT LINER LAP TEST TO
2400#. CEMENTAT 1000 PSI COMPRESSIVE
AT 20:39
- STARTED INJECTING AT 1600#.
- CONTINUED TO RIG FLOOR UP WITH HES
EQUIPMENT
13,602.00 OTHCMP
CREW HANDOVER
- PJSM WITH TCP.
13,602.00 OTHCMP
MAKE UP 2" MAXFORCE 6 SPF PERF GUNS
(59 GUNS)
INSTALL SAFETY JOINT
SWAP ELEVATORS TO 1-1/4"
_
PROGRAM FIRING _HEAD
13,602.00 OTHCMP
M/U FIRING HEADAND 5/8" DISCONNECT.
M/U 13 JTS OF 1-1/4" CSH AND 2 JTS 2-1/16"
CSH.
M/U SWIVELAND INJECTOR TO WELL.
TEST QTS TO 3,500 PSI, GOOD.
Printed 1/28/2019 11:25:OSAM **All depths reported in Drillers Depths"
Common Well Name: P-04
Event Type: COM- ONSHORE (CON)
Project: PBU
Rig Name/No.: CDR -2
North America - ALASKA - BP
Page 12 of 13
Operation Summary Report
AFE No
Start Date: 1/4/2019 End Date: 1/10/2019 X3 -0197J -C'. (979,713 00 )
Site: P
Active datum: KB Q91.64usft (above Mean Sea Level)
Date From - To Hrs Task Code
(hr)
0400 - 0730 3.50 PERF P
07:30
- 08:15
0.75
08:15
- 08:40
0.42
0840
- 0950
1.17
PERF P
PERF P
.i
PERF P
09'.50
- 1220
2.50
PERF
T P
1220
- 1330
1.17
PERF
P
BPUOI: USA00001646
NPT Total Depth
Phase Description of Operations
(us(t)
13,602.00
OTHCMP RIH WITH PERF BHA#13.
UP WEIGHT AT 11,000' IS 47K.
RIH PAST LINER TOP SLOWLY, NOTHING
SEEN.
LIGHT TAG AT 13,554' UNCORRECTED.
PICK UP AND REPEAT, SAME DEPTH.
DEPTH IS CONSISTENT WITH PREVIOUS
DRILLING CORRECTIONS WITH RETAINER
BEING AT 13,548.61.
CORRECT DEPTH TO 13,548.6'.
UP Wf IS 53K. _
13,602.00
OTHCMP WAIT FOR FIRING HEAD TO TURN ON,
PROGRAMMED FOR 08:15.
13,602.00
OTHCMP ''START PRESSUREAND MOTION SEQUENCE
TO ACTIVATE FIRING HEAD.
AFTER FINAL MOTION MOVE TO SHOT DEPTH
AND WAIT. KEEP 150 PSI WHPAS INDICATOR
FOR GUNS FIRING.
13,602.00
OTHCMP GOOD SHOT INDICATION FROM ACOUSTICS
AND FLUID LOSS.
POOH.
INCREASE PUMP RATE TO 3 BPM, START
.NEW KCL DOWN CT.
HOLD 250 PSI WHP WHILE PERF GUNS ARE
INSIDE LINER.
PERFORATED INTERVALS:
12,410' -12,586-
12,765- - 12,793-
12,855' -12,955-
12,955'13,100'
13,100-
-13,315'13,350'-13,460'13,602.00
OTHCMP ABOVE LINER TOP BLEED OFF WHIP, 10 MIN
FLOW CHECK IS GOOD.
CONTINUE POOH.
SWAPTO GEN POWER WHILE POOH SO
HIGHLINE POWER CABLE CAN BE RIGGED
DOWN.
13,602.00
OTHCMP ABOUT 300' FT FROM SURFACE TAKE
RETURNS TO TIGER TANK
PULL UP TO 100' THEN BACK TO 1500' JOG
TAKING RETURNS OUTSIDE.
AT SURFACE, 10 MIN FLOWCHECK IS GOOD.
CONDUCT PJSM WITH HES AND NABORS
CREW FOR LAYING DOWN CSN AND PERF
Printed 12812019 11:25:06AM **All depths reported in Drillers Depths"
North America - ALASKA- BP Page 13 of 13
Operation Summary Report
Common Well Name: P-04 AFE No
Event Type: COM- ONSHORE (CON) Start Dale'. 1/4/2019 End Date: 1/10/2019 X3 -0197J -C: (979,713.00 )
Project: PBU Site: P
Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:0000AM Rig Release:
Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646
Active datum: KB Q91.64usft (above Mean Sea Level)
Date From - To Him Task Code NPT Total Depth Phase Description of Operations
(hr) (usft)
13:30 - 19:00 5.50 PERF P 13,602.00 OTHCMP SLIDE INJECTOR BACK,
19:00 - 19:15 0.25 CONDHL P
1915 - 0000 4.75 RIGID P
1/10/2019 00:00 - 06:00 6.00 RIGID
0600 - 1000 4.00 RIGD
P
P
Printed 1/2612019 11:25'.06AM "'All depths reported in Drillers Depths"
UD 2 JOINTS OF 2-1/16" CSH.
AT FIRST JOINT OF 1-1/4" CSH, CONDUCT D1
DRILL WITH BEARD CREW.
JOINT OF 2-1/16" IS ON THE SKATE, ROLL IT
OFF AND BRING SAFETY JOINT TO FLOOR.
TORQUE UP SAFETY JOINT, RUN INTO WELL
AND SIMULATE SHUTTING WELL IN.
WELL SECURED IN 7 MIN.
CONTINUE UD 1-1/4 CSH.
INSTALL SAFETY JOINT AFTER LAST 1-1/4" IS
UD TO CHANGE ELEVATORS FOR PERF
GUNS.
CONTINUE UD ALL PERF GUNS.
ALL SHOTS FIRED.
OOH WITH GUNS. CLEAN AND CLEAR RIG
FLOOR OF HANDLING _EQUIPMENT.
13,602.00
OTHCMP INJECTIVITYTEST
- 1.0 BPM AT 1600# FOR 15 BBLS OF 1% KCL
- DISCUSS WITH ODE ON OPTIONS TO KEEP
_
FREEZE PROTECT OFF CRITICAL PATH.
13,602.00
OTHCMP END OF WELL OPS
-REVERSE CIRCULATE E -LINE BACK WHILE
DISPLACING TO FRESHWATER.
-PERFORM PACKOFF, IRV, C9/C10
BACKWARDS TEST. 250 LOW/ 3500# HIGH
ALLPASSED
- RIG UP COIL CUTTER, CUT 280' COIL.
DRESSCOIL. INSTALL COIL CONNECTOR.
PULL TEST CONNECTOR TO 50K, GOOD
TEST.
13,502.00
POST PJSM,
-MAKEUP NOZZLE AND STINGER. PUMP
E -LINE FORWARD
-JET STACK WHILE PUMPING VOLUME
FORWARD.
- INSTALL NIGHT CAP FOR BLOW DOWN.
FLUID PACK. LTT TO 3500#
- BHI MAKING UP UQC W/ FLOATS. PT UQC
AND CTC TO 4200# GOOD TEST.
-START BIG BOY COMPRESSOR, START
BLOWING DOWN RIG.
- NIPPLE DOWN MPD LINE.
- RIG UP TO TEST FLOATS. TEST FLOATS TO
4200# GOOD TEST
- SIMOPS: RIG UP LRS ON TANGO VALVES.
FREEZE PROTECT WELL WITH 35 BBLS OF
90° DIESELAND 3 BBL METHANOL CAP WHILE
_
BLOWING DOWN REEL. 0.8 BPM @ 1950#.
13,602.00
POST GREASE CREW SERVICE TREE VALVES.
GET GOOD LTT ON SWAB AND MASTER
VALVES, THEN CLOSE SSV.
REMOVE BOPS, INSTALL TREE CAP. TEST
TREE CAP TO 3500#.
"`RIG RELEASED AT 10:00•'•
Printed 1/2612019 11:25'.06AM "'All depths reported in Drillers Depths"
Continued from day shift. T/I/0= 0/0/0 Post CDR2. Barriers MV & SV. Verified by
performing independent LTT. Macnical issues with truck. Job on hold. Job Continued on
1/10/2019
1/11/2019
T/1/0= 0/0/0 POST CDR2. Continued from 1/10/2019. R/U CIW Lubricator 840 W/ 4" H
plug and tool. PT'd lubricator Low 300psi, High 3500psi. Set TWC # 296 @ 125 top of
window. Good set. R/D lubricator & swapped over to pulling tool & R/U lubricator. Torqued
Tree with no movement on any studs. PT'd Tree low 300psi, Hight 5000psi. (Passed).
Pulled TWC # 296 @ 125 top of window. Installed tree cap & PT'd to 500psi. RDMO
1/11/2019
"'Job Complete"` FWHP= 0/0/0
"'WELL FOUND S/I ON ARRIVAL"'
DRIFTED TO DEVIATION @ 11,615' SLM w/ 2.51" CENT, AND 1.75" S-BLR.
RAN PDS JEWELRY LOG FROM 11,350' SLM TO SURFACE.
1/20/2019
'"WSR CONTINUED ON 1/21/19"'
T/I/0= VacNacNac Temp= S/I Assist SSL (CTD) Pumped 14 bbls crude down TBG,
1/21/2019
"`WSR Continued on 01-22-19"'
'"WSR CONTINUED FROM 1/20/19'•` (ctd)
SET 4-1/2" WHIDDON CATCHER AT 11245' SLM.
PULLED STA#4 BK-DGLV FROM 6765' MD
PULLED STA#5 BK-DGLV FROM 3110' MD
SET STA#5 BK-LGLV AT 3110' MD.
SET STA#4 BK-DGLV AT 6765' MD.
PULLED 4-1/2" WHIDDON CATCHER FROM 11245' SLM.
RAN DUMMY 3.70" 45 KB LNR TOP PKR, 2' SPACER PUP, DMY PTSA TO 11,270' MD.
(Unable to get full penetration)
RAN 4-1/2" BRUSH TO BRUSH LTP @ 11,270MD.
RAN DUMMY 3.70" 45 KB LNR TOP PKR, 2' SPACER PUP, DMY PTSA TO 11,270' MD.
(Unable to get full penetration)
RAN 4-1/2" BRUSH TO BRUSH LTP @ 11,270' MD WHILE PUMPING.
1/21/2019
"'WSR CONTINUED ON 1/22/19"'
"'WSR CONTINUED FROM 1/21/19"' (ctd)
SUCCESSFUL DRIFT TO 11237' SLM W/ 3.70" LTP DRIFT.
\K .X
SET 45 KB LNR TOP PACKER W/ '
11261' MD)
j Q' `-(
%t"*
PSI (PASS).
V aC/
Q1/22/2019
PULL 2-7/8" XX PLUG FROM LTPAT 11237' SLM. (11274' md)
"`WELL
TURNED OVER TO DSO'"
"'WSR Continued from 01-21-19"' Temp= S/I Assist SSL MIT-T '"PASS'" @ 2311.
Max applied 2400, target 2160. Pumped 5 bbls crude down TBG to assist SSL, Pumped
4.92 bbis to reach test pressure. 1 st 15 min lost 54 psi. 2nd 15 min lost 25 psi. Total loss
1/22/2019
of 79 psi. Bled back --1.9 bbis. Hang tags. FWHP's 290/0/0. SLB on well upon departure.
by
North America - ALASKA - BP
PBU
P
P-04
P -04A
500292218001
Design:P-04A
Final Survey Report
08 January, 2019
F I
Company:
North America - ALASKA - BP
Project:
PBU
Site:
P
Well:
P-04
Wellbore:
P -04A
Design:
P -04A
BP
Final Survey Report
Local Co-ordinate Reference:
Well P-04
TVD Reference:
KB @ 91.64usft (P -04A)
MD Reference:
KB @ 91.64usft (P -04A)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Protect PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27' OGP-Usa AK [4267'15864) Using Well Reference Point
Map Zone: NAD27 •OGP-Usa AK / Alaska zone 4 [26734.1586, Using geodetic scale factor
site
P, TR -11-13
Site Position:
Northing:
From:
Map
Easting:
Position Uncertainty:
0.00 usft
Slot Radius:
j Well _ -
- P-04, P-04
Well Position
+N/ -S 0.00 usft
Northing:
•E/ -W 0.00 usft
Easting:
Position Uncertainty
0.00 usft
Wellhead Elevation:
Wellbore P -04A
Magnetics Model Name Sample Date Declination
1°)
BGGM2018 12/1/2018 17.02
Design P -04A
Audit Notes:
Version: Phase: ACTUAL
Vertical Section: Depth From (TVD) -N/-S
(usft) (usft)
3784 000
5,949,377.170 usft
623,154.060 usft
0.000 in
5,947,292.220 usft
631,283.590 usft
53.80 usft
Latitude: 70' 16' 12.612 N
Longitude: 149° 0' 14.402 W
Grid Convergence: 0.94 °
Latitude: 70° 15'50.757 N
Longitude: 148° 56'18,821 W
Ground Level: 53.80 usft
Dip Angle Field Strength
(nT)
80.90 57,437
Tie On Depth: 11,515.29
.FJ -W Direction
(usft) (°)
0 00 107 31
182019 12:45:34PM Page 2 COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well P-04
Project: PBU
TVDSS
NIS
TVD Reference:
KB @ 91.64usft (P -04A)
Site: P
Easting
DLeg
MD Reference:
KB @ 91.64usft (P -04A)
Well: P-04
(°)
(usft)
North Reference:
True
Wellbom: P -04A
(usft)
Survey Calculation Method:
Minimum Curvature
Design: P -04A
0.00
Database:
EDM RSK- Alaska PROD -ANCPI
Survey Program
Date 1/7/2019
0.00
5,947,292.220
From
To
50.30
0.17
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
-0.02
50.30
11,515.29 P-04 Srvy 1 GCT -MS (P-04)
GCT -MS
Schlumberger GCT multishot
65.50
11,517.00
13,602.00 Survey #1 (P -04A)
MWD
MWD - Standard
-26.14
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
EMI
Northing
Easting
DLeg
(usft)
(")
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
37.84
0.00
0.00
37.84
-53.80
0.00
0.00
5,947,292.220
631,283.590
0.00
50.30
0.17
299.44
50.30
.41.34
0.01
-0.02
5,947,292.229
631,283.574
1.36
65.50
0.17
31467
65.50
-26.14
0.04
-0.05
5,947,292.255
631,283.538
0.30
81.00
0.15
314.06
8100
-10.64
0.07
-0.08
5,947,292.285
631,283.506
0.13
96.40
0.17
317.27
96.40
4.76
0.10
-0.11
5,947,292.315
631,283.476
0.14
111.80
0.20
319.80
111.80
20.16
0.13
-0.15
5,947,292.352
631,283.442
0.20
127.20
0.20
327.08
127.20
35.56
0.18
-0.18
5,947,292.394
631,283.409
0.16
142.60
0.22
324.82
142.60
50.96
0.22
-021
5,947,292.441
631,283.377
0.14
158.05
0.20
315.27
158.05
66.41
0.27
-0.25
5,947,292.483
631,283.340
0.26
173.60
0.17
313.25
173.60
81.96
0.30
-0.28
5,947,292.518
631,263.304
0.20
189.10
0.13
312.46
189.10
97.46
0.33
-0.31
5,947,292.545
631,283.273
0.26
204.85
0.13
310.83
204.85
113.21
0.35
434
5,947,292.568
631,283.246
0.02
220.80
0.12
303.61
220.80
129.16
0.38
-0.37
5,947,292.589
631,283.218
0.12
236.75
0.10
292.70
236.75
145.11
0.39
-0.39
5,947,292.603
631,283.191
0.18
252.95
0.05
286.41
252.95
161.31
0.40
-0.41
5,947,292.610
631,283.171
0.31
269.05
0.02
317.06
269.05
177.41
040
-0.42
5,947,292.614
631,283.163
0.21
285.25
0.03
359.83
285.25
193.61
0.41
-0.42
5,947,292.620
631,283.161
0.13
301.45
0.07
12.86
301.45
209.81
0.42
-0.42
5,947,292.634
631,283.163
0.25
317.65
0.10
8.16
317.65
226.01
0.45
-0.42
5,947,292.658
631,283.168
0.19
334.05
0.12
358.17
334.05
242.41
0.48
-0.41
5,947,292.689
631,283.167
0.17
350.15
0.13
345.87
350.15
258.51
0.51
-0.42
5,947,292.724
631,283.162
0.18
V. Sec
(usft)
0.00
-0.02
-0.06
-0.10
-0.14
-0.18
-0.22
-0.27
-0.31
-0.36 _
-0.40
-0.43
-0.46
-0.49
-0 51
-0.52
-0.52
-0.53
-053
-0.54
-055
1/8/2019 12:45:34PM Page 3 COMPASS 5000.1 Build BID
BP
Final Survey Report
Company:
North America-
ALASKA - BP
Local Coordinate
Reference:
Well P-04
Project:
Pau
TVD Reference:
KB @ 91.64usft (P -04A)
Site:
P
MD Reference:
KB (d 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation
Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK-
Alaska PROD -ANCPI
Survey
SIIMD
Inc
Aid(ssimuth)
TVD
TVDSS
NIS
EMI
Northing
Easting
DLeg
V. Sec
(usm
0
P)
(us8)
(usR)
(usft)
(usft)
(usR)
(usf)
('1100usft)
(usi
366.55
0.15
330.41
366.55
274.91
0.55
-0.43
5,947,292.760
631,283.146
0.26
-0.58
382.70
0.13
319.19
382.70
291.06
0.58
-0.46
5,947,292.792
631,283.123
0.21
-0.61
398.75
0.13
313.13
398.75
307.11
0.61
-0.48
5,947,292.818
631,283.097
0.09
-0.64
414.95
0.12
303.27
414.95
323.31
0.63
-0.51
5,947,292.839
631,283.069
0.15
-0.67
431.15
0.12
286.48
431.15
339.51
0.64
-0.54
5,947,292.853
631,283.039
0.22
-0.71
447.15
0.12
274.91
447.15
355.51
0.65
-0.57
5,947,292.858
631,283.006
0.15
-0.74
462.95
0.08
264.24
462.95
371.31
0.65
-0.60
5,947,292.856
631,282.978
0.28
-0.77
478.95
0.07
237.21
478.95
387.31
0.84
-0.62
5,947,292.851
631,282.959
0.23
-0.78
494.85
0.07
213.37
494.85
403.21
0.63
-0.63
5,947,292.838
631,282.946
0.18
-0.79
510.55
0.08
200.31
510.55
418.91
0.61
-0.64
5,947,292.819
631,282.937
0.13
-0.79
526.25
0.08
180.10
526.25
434.61
0.59
-0.65
5,947,292.798
631,282.934
0.18
-0.79
542.15
0.08
160.05
542.15
450.51
0.57
-0.64
5,947,292.777
631,282.938
0.18
-0.78
558.25
0.08
148.49
558.25
466.61
0.55
-0.63
5,947,292.757
631,282.948
0.10
-0.77
574.25
0.10
141.14
574.25
482.61
0.53
-0.62
5,947,292.736
631,282.963
0.14
-075
590.25
0.10
132.59
590.25
498.61
051
-0.60
5,947,292.716
631,282.982
0.09
-0.72
606.25
0.10
128.66
606.25
514.61
0.49
-0.58
5,947,292.699
631,283.004
0.04
-0.70
622.10
0.08
127.20
622.10
530.46
0.47
-0.56
5,947,292.684
631,283.024
0.13
-0.67
638.00
0.10
120.92
638.00
546.36
0.46
-0.54
5,947,292.670
631,283.045
0.14
-0.65
653.95
0.12
118.70
653.95
562.31
0.44
-0.51
5,947,292.655
631,283.071
0.13
-0.62
670.00
0.12
119.26
670.00
578.36
0.43
-0.48
5,947,292.640
631,283.101
0.01
-0.59
686.00
0.12
118.36
686.00
594.36
0.41
-0.45
5,947,292.624
631,283.131
0.01
-055
701.90
0.12
117.36
701.90
610.26
0.40
-0.42
5,947,292.609
631,283.160
0.01
-0.52
717.90
0.12
117.92
717.90
626.26
0.38
-0.39
5,947,292.594
631,283.190
0.01
-0.49
733.90
0.12
119.48
733.90
642.26
0.36
-0.36
5,947,292.578
631,283.220
0.02
-0.46
750.00
0.12
120.55
750.00
658.36
0.35
-0.33
5,947,292.562
631,283.250
0.01
-0.42
766.05
0.12
119.70
766.05
674.41
0.33
-0.31
5,947,292.546
631,283.279
0.01
-0.39
782.10
0.12
116.76
782.10
690.46
0.32
-0.28
5,947,292.530
631,283.309
0.04
-0.36
1/82019 12:45:34PM
Page 4
COMPASS 5000.1 Build BID
an
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Co-ordinate
Reference:Well
P-04
Project:
PBU
TVD Reference:
KB @ 91.64usft (P -04A)
Site:
P
MD Reference:
KB @ 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation
Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK- Alaska PROD -ANCPI
Survey
MD Inc
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting DI-eg
(usft) (°)
(°)
(usft)
(usft(
(usft)
(usft)
(usft)
(usft) (°/100usft)
798.20
0.12
114.88
798.20
706.56
0.30
-0.25
5,947,292.516
631,283.339
0.02
814.25
0.10
110.32
814.25
722.61
0.29
-0.22
5,947,292.505
631,283.368
0.14
830.30
0.10
101.85
830.30
738.66
0.28
-0.19
5,947,292.497
631,283.395
0.09
846.40
0.08
97.76
846.40
754.76
0.28
-0.17
5,947,292.493
631,283.420
0.13
862.55
0.08
99.64
862.55
770.91
0.27
-0.14
5,947,292490
631,283.442
0.02
878.60
0.07
93.22
878.60
786.96
0.27
-0.12
5,947,292.488
631,283.463
0.08
894.70
0.07
73.90
894.70
803.06
0.27
-0.10
5,947,292.491
631,283.482
0.15
910.80
0.07
62.71
910.80
819.16
0.28
-0.08
5,947,292.498
631,283.500
0.08
926.90
0.07
64.53
926.90
835.26
0.29
-0.07
5,947,292.508
631,283.518
0.01
942.90
0.07
58.34
942.90
851.26
0.30
-0.05
5,947,292.517
631,283.535
0.05
958.90
0.07
49.11
956.90
867.26
0.31
-0.03
5,947,292.529
631,283.550
0.07
975.00
0.07
45.99
975.00
883.36
0.32
-0.02
5,947,292.542
631,283.565
0.02
991.15
0.07
39.06
991.15
899.51
0.34
-0.01
5,947,292.557
631,283.578
0.05
1,007.30
0.05
33.91
1,007.30
915.66
0.35
0.00
5,947,292.571
631,283.588
0.13
1,023.45
0.05
36.72
1,023.45
931.81
0.36
0.01
5,947,292.583
631,283.595
0.02
1,039.50
0.03
42.67
1,039.50
947.86
0.37
0.02
5,947,292.591
631,283.602
0.13
1,055.60
0.02
81.87
1,055.60
963.96
0.37
0.02
5,947,292.595
631,283.608
0.12
1,071.90
0.02
130.49
1,071.90
980.26
0.37
0.03
5,947,292.594
631,283.613
0.10
1,088.10
0.02
159.40
1,088.10
996.46
0.37
0.03
5,947,292.589
631,283.616
0.06
1,104.30
0.05
183.70
1,104.30
1,012.66
0.36
0.03
5,947,292.579
631,283.617
0.20
1,120.50
0.08
184.12
1,120.50
1,028.86
0.34
0.03
5,947,292.561
631,283.616
0.19
1,136.60
0.10
179.24
1,136.60
1,044.96
0.32
0.03
5,947,292.536
631,283.616
0.13
1,152.75
0.12
184.11
1,152.75
1,061.11
0.28
0.03
5,947,292.505
631,283.615
0.14
1,168.70
0.15
187.61
1,168.70
1,077.06
0.25
0.03
5,947,292.467
631,283.612
0.19
1,184.70
0.18
188.13
1,184.70
1,093.06
0.20
0.02
5,947,292.422
631,283.606
0.19
1,200.50
0.22
186.92
1,200.50
1,108.86
0.15
0.01
5,947,292.367
631,283.600
0.25
1,216.60
0.25
186.66
1,216.60
1,124.96
0.08
0.00
5,947,292.301
631,283.594
0.19
V. Sec
(usft)
-0.32
-0.29
-0.27
-0.24
-0.22
-0.20
-0.18
-0.16
-0.15
-0.14
-0.12
-0.11
-0.11
-0.10
-0.10
-0.09
-0.09
-0.08
-0.08
-0.08
-0.07
-0.06
-0.06
-0.05
-0.04
-0 03
-0.02
1/8/2019 12:45: 34PM Page 5 COMPASS 5000.1 Build 81D
r z
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well P-04
Project:
PBU
TVD Reference:
KB @ 91.64usft (P -04A)
Site:
P
MD Reference:
KB @ 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
1,232.60
0.25
187.25
1,232.60
1,140.96
001
0.00
5,947,292.232
631,283.586
0.02
1,248.30
0.27
187.07
1,248.30
1,156.66
-0.06
-0.01
5,947,292.161
631,283.579
0.13
1,264.20
0.28
187.52
1,264.20
1,172.56
-0.13
-0.02
5,947,292.085
631,283.570
0.06
1,280.10
0.30
18547
1,280.10
1,188.46
-0.21
-0.03
5,947,292.005
631,283.563
0.14
1,296.00
0.32
182.11
1,296.00
1,204.36
-0.30
-0.04
5,947,291.919
631,283.559
0.17
1,312.00
0.32
179.51
1,312.00
1,220.36
-0.39
-0.04
5,947,291.830
631,283.559
0.09
1,328.00
0.32
176.58
1,328.00
1,236.36
-0.48
-0.03
5,947,291.741
631,283.563
0.10
1,343.90
0.33
173.28
1,343.90
1,252.26
-0.57
-0.03
5,947,291.651
631,283.573
0.13
1,359.80
0.33
170.23
1,359.80
1,268.16
-0.66
-0.01
5,947,291.561
631,283.586
0.11
1,375.70
0.35
167.65
1,375.70
1,284.06
-0.75
0.00
5,947,291.468
631,283.607
0.16
1,391.60
0.33
158.46
1,391.60
1,299.96
-0.84
0.03
5,947,291.379
631,283.636
0.36
1,407.50
0.30
146.63
1,407.49
1,315.85
-0,92
0.07
5,947,291.301
631,283.676
0.39
1,423.50
0.27
142.81
1,423A9
1,331.65
-099
0.11
5,947,291.236
631,283.722
0.26
1,439.50
0.25
136.79
1,439.49
1,347.85
-1.04
0.16
5,947,291.182
631,283.769
0.21
1,455.35
0.22
132.43
1,455.34
1,363.70
-1.09
0.21
5,947,291.137
631,283.816
0.22
1,471.20
0.20
129.33
1,471.19
1,379.55
-1.13
0.25
5,947,291.100
631,283.861
0.15
1,487.10
0.18
124.74
1,487.09
1,395.45
-1.16
0.29
5,947,291.069
631,283.903
0.16
1,503.10
0.15
118.15
1,503.09
1,411.45
-1.18
0.33
5,947,291.045
631,283.943
0.22
1,518.50
0.13
109.41
1,518A9
1,426.85
-1.20
0.37
5,947,291.030
631,283.977
0.19
1,533.50
0.12
102.49
1,533.49
1,441.85
-1.21
0.40
5,947,291.022
631,284.009
0.12
1,548.10
0.12
99.49
1,548.09
1,456.45
-1.21
0.43
5,947,291.016
631,284.039
0.04
1,562.30
0.10
91.02
1,562.29
1,470.65
-1.21
0.46
5,947,291.014
631,284.066
0.18
1,576.45
0.07
70.73
1,576.44
1,484.80
-1.21
0.48
5,947,291.017
631,284.087
0.30
1,590.60
0.07
56.38
1,590.59
1,498.95
-1.20
0.49
5,947,291.025
631,284.102
0.12
1,604.70
0.07
51.51
1,604.69
1,513.05
-1.19
0.50
5,947,291.036
631,284.116
0.04
1,618.70
0.08
47.81
1,618.69
1,527.05
-1.18
0.52
5,947,291.048
631,284.129
0.08
1,632.85
0.10
55.89
1,632.84
1,541.20
-1.17
0.54
5,947,291.062
631,284.147
0.17
V. Sec
(usft)
-001
0.01
0.02
0.03
0.05
008
0.11
0.14
0.18
023
0.26
0.34
0,40
0.46
0.52
0.57
0.62
0.67
071
0.74
077
0.80
0.81
0.83
084
0.85
0.86
1/8/2019 12:45: 34PM Page 6 COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate
Reference:
Well P-04
Project:
PBU
TVD Reference:
KB @ 91.64usft (P -04A)
Site:
P
MD Reference:
KB @ 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation
Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting DLeg
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (Wousft)
1,646.95
0.18
69.70
1,646.94
1,555.30
-1.15
0.57
5,947,291.077
631,284.177
0.61
1,661.00
0.35
81.51
1,660.99
1,569.35
-1.14
0.63
5,947,291.092
631,284.240
1.26
1,675.15
0.55
89.70
1,675.14
1,583.50
-1.13
0.74
5,947,291.100
631,284.351
1.48
1,689.25
0.80
96.66
1,689.24
1,597.60
-1.14
0.91
5,947,291.092
631,284.516
1.86
1,703.30
1.17
103.61
1,703.29
1,611.65
-1.19
1.14
5,947,291.051
631,284.754
2.76
1,717.40
1.47
105.96
1,717.39
1,625.75
-1.27
1.46
5,947,290.973
631,285.069
2.16
1,731.50
1.77
106.82
1,731.48
1,639.84
-1.39
1.84
5,947,290.867
631,285.453
2.13
1,745.50
2.10
107.78
1,745.47
1,653.83
-1.53
2.29
5,947,290.734
631,285.907
2.37
1,759.60
2.40
108.42
1,759.56
1,667.92
-1.70
2.82
5,947,290.571
631,286.436
2.14
1,773.65
2.75
109.49
1,773.60
1,681.96
-1.90
3.41
5,947,290.376
631,287.036
2.51
1,787.70
3.15
110.76
1,787.63
1,695.99
-2.15
4.09
5,947,290.139
631,287.719
2.88
1,801.80
3.47
111.55
1,801.71
1,710.07
-2.45
4.85
5,947,289.858
631,288.483
2.29
1,815.85
3.93
112.16
1,815.73
1,724.09
-2.78
5.69
5,947,289.535
631,289.330
3.29
1,827.90
4.40
112.63
1,827.74
1,736.10
-3.12
6.50
5,947,289.216
631,290.145
3.91
1,837.60
4.57
112.79
1,837.41
174577
-341
7.20
5,947,288.935
631,290.850
1.76
1,856.10
5.13
113.34
1,855.85
1764.21
-4.02
8.64
5,947,288.347
631,292.299
3.04
1,875.65
5.78
113.65
1,875.31
1,783.67
-4.77
10.34
5,947,287.636
631,294.016
3.33
1,899.00
6.45
113.52
1,898.53
1,806.89
-5.76
12.62
5,947,286.681
631,296.312
2.87
1,924.70
7.12
112.86
1,924.05
1,832.41
-6.96
15.42
5,947,285.535
631,299.123
2.62
1,950.10
7.65
112.00
1,949.24
1,857.60
-8.20
18.43
5,947,284.343
631,302.163
2.13
1,975.20
8.22
110.96
1,974.10
1,882.46
-9.47
21.66
5,947,283.132
631,305.409
2.34
2,000.90
9.02
109.76
1,999.50
1,907.86
-10.81
25.27
5,947,281.857
631,309.043
3.19
2,026.80
9.85
109.13
2,025.05
1,933.41
-12.22
29.27
5,947,280.514
631,313.070
3.23
2,052.75
10.60
108.64
2,050.59
1,958.95
-13.71
33.63
5,947,279.100
631,317.454
2.91
2,078.70
11.40
108.14
2,076.06
1,98442
-15.27
38.33
5,947,277.621
631,322.179
3.10
2,104.60
12.23
107.80
2,101.42
2,009.78
-16.91
43.38
5,947,276.074
631,327.251
3.22
2,130.60
12.98
107.20
2,126.79
2,035.15
-18.61
48.79
5,947,274.463
631,332.691
2.93
0.88
0.94
1.04
1.21
1.45
1.77
2.17
2.64
3.19
3.83
4.55
5.36
6.26
7.14
7.89
945
11.29
13.77
16.79
20.04
23.49
27.34
31.58
36.19
41.14
46.44
52.12
1/82019 12:45:34PM Page 7 COMPASS 5000.1 Build BID
lim
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well P-04
Project:
Pau
TVD Reference:
KB 91.64usft (P -04A)
Site:
P
MD Reference:
KB 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(waft)
(usft)
(usft)
(Woueft)
Wait)
2,156.55
13.68
106.55
2,152.04
2,060.40
-20.35
54.51
5,947,272.828
631,338.445
2.76
58.10
2,182.60
14.45
106.21
2,177.31
2,085.67
-22.13
60.59
5,947,271.149
631,344.549
2.97
6443
2,208.60
15.10
106.15
2,202.45
2,110.81
-23.98
66.95
5,947,269.413
631,350.947
2.50
71.06
2,234.70
1543
106.28
2,227.63
2,135.99
-25.90
73.55
5,947,267.610
631,357.578
1.27
77.93
2,260.80
15.70
106.60
2,25277
2,161.13
-27.88
80.27
5,947,265.745
631,364.328
1.09
84.93
2,286.90
16.18
107.47
2,277.87
2,18623
-29.98
87.12
5,947,263.765
631,371.216
2.05
92.10
2,313.10
16.88
108.61
2,302.98
2,211.34
-32.29
94.21
5,947,261.579
631,378.341
2.94
99.55
2,339.30
17.67
109.50
2,328.00
2,236.38
-34.83
101.56
5,947,259.166
631,385.737
3.18
107.33
2,365.40
18.48
110.15
2,352.81
2,261.17
-37.58
109.18
5,947,256.553
631,393.401
3.20
115.42
2,391.60
19.33
110.27
2,377.60
2,285.96
40.51
117.15
5,947,253.759
631,401.416
3.25
123.89
2,417.50
20.08
109.86
2,401.98
2,310.34
43.51
125.35
5,947,250.908
631,409.669
2.94
132.62
2,443.50
20.88
109.18
2,426.34
2,33470
46.55
133.92
5,947,248.019
631,418294
3.21
141.71
2,469.50
21.73
108.21
2,450.56
2,358.92
-49.57
142.87
5,947,245.150
631,427.293
3.54
151.15
2,495.80
22.45
107.40
2,474.93
2,383.29
-52.60
152.29
5,947,242.291
631,436.761
2.97
161.04
2,522.10
23.07
107.14
2,499.18
2,407.54
-55.62
162.01
5,947,239.441
631,446.527
2.39
171.22
2,548.30
23.67
107.06
2,523.24
2,431.60
-58.67
171.94
5,947,236.559
631,456.511
2.29
181.61
2,574.50
24.23
106.76
2,547.18
2,455.54
-61.77
182.11
5,947,233.644
631,466.739
2.19
192.24
2,599.70
24.72
106.34
2,570.11
2,478.47
-64.74
192.12
5,947,230.846
631,476.796
2.06
202.88
2,623.80
25.20
105.88
2,591.96
2,500.32
-67.56
201.89
5,947,228.195
631,486.613
2.15
212.85
2,648.25
25.72
105.43
2,614.04
2,522.40
-70.40
212.01
5,947,225.536
631,498.781
2.27
223.36
2,672.25
26.17
105.19
2,635.62
2,543.98
-73.17
222.14
5,947,222.941
631,506.955
1.93
233.85
2,695.90
28.45
105.18
2,656.82
2,565.18
-75.91
232.26
5,947,220.373
631,517.117
1.18
244.33
2,719.60
26.82
105.33
2,678.02
2,586.38
-78.70
242.47
5,947,217.766
631,527.378
0.77
254.91
2,743.70
26.67
105.66
2,699.56
2,607.92
-81.59
252.89
5,947,215.060
631,537.840
0.65
265.71
2,767.90
26.72
105.94
2,721.19
2,629.55
-84.55
263.35
5,947,212.283
631,548.351
0.56
276.58
2,792.00
26.85
106.00
2,742.70
2,651.06
-87.54
273.79
5,947,209.478
631,558.842
0.55
287.43
2,816.10
27.13
106.23
2,764.17
2,672.53
-90.57
284.30
5,947,206.626
631,569.400
1.24
298.37
1,8/2019 12'45'34PM Page 8 COMPASS 5000.1 Build 81D
BP
by Final Survey Report
Company:
North Amenca- ALASKA - BP
Local Coordinate
Reference:
Well P-04
Project:
PBU
TVD Reference:
KB 91.64usft (P -04A)
Site:
P
MD Reference:
KB 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°I100usft)
(usft)
2,840.30
27.80
106.62
2,785.65
2,694.01
-93.73
295.00
5,947,203.657
631580.158
2.87
309.53
2,864.30
28.88
108.83
2,806.77
2,715.13
-97.01
305.91
5,947,200.569
631,591.123
4.52
320.92
2,888.20
30.12
106.60
2,827.57
2,735.93
-100.39
317.18
5,947,197.382
631,602.451
5.21
332.69
2,912.20
31.47
105.96
2,848.19
2,756.55
-103.83
328.98
5,947,194.145
631,614.303
5.79
344.97
2,936.25
33.07
105.13
2,868.52
2,776.88
-107.27
341.35
5,947,190.923
631,626.730
6.90
357.81
2,960.20
34.40
104.39
2,888.44
2,796.80
-110.66
354.21
5,947,187.761
631,639.648
5.81
371.09
2,984.20
35.13
103.93
2,908.15
2,816.51
-114.01
367.48
5,947,184.646
631,652.973
3.23
384.76
3,008.20
35.57
103.60
2,927.73
2,836.09
-117.31
380.97
5,947,181.578
631,666.514
2.00
398.62
3,031.90
36.05
103.09
2,946.95
2,855.31
-120.51
394.46
5,947,178.614
631,680.059
2.38
412.45
3,054.40
36.43
102.62
2,965.10
2,873.46
-123.47
407.43
5,947,175.881
631,693.075
2.09
425.71
3,077.55
36.67
102.40
2,983.69
2,892.05
-126.46
420.89
5,947,173.131
631,706.583
1.18
439.45
3,101.20
36.93
10228
3,002.63
2,910.99
-129.48
434.73
5,947,170.345
631,720.473
1.14
453.56
3,124.90
3230
102.16
3,021.53
2,929.89
-132.51
- 448.70
5,947,167.562
631,734.499
1.59
467.81
3,148.70
37.60
102.13
3,04042
2,948.78
-135.56
462.85
5,947,164.765
631,748.697
1.26
482.22
3,172.45
37.80
102.12
3,059.22
2,967.58
-138.61
477.05
5,947,161.963
631,762.947
0.84
496.69
3,196.25
38.28
102.03
3,077.96
2,986.32
-141.68
491.39
5,947,159.146
631,777.338
2.03
511.29
3,220.00
39.03
101.94
3,096.51
3,004.87
-144.76
505.90
5,947,156.319
631,791.900
3.17
526.06
3,243.80
39.70
101.86
3,114.91
3,023.27
-147.87
520.67
5,947,153.465
631,806.722
2.82
541.09
3,267.70
40.15
101.80
3,133.24
3,041.60
-151.01
535.69
5,947,150.583
631,821.786
1.89
556.36
3,291.50
40.65
101.82
3,151.36
3,059.72
-154.17
550.79
5,947,147.690
631,836.936
2.10
571.71
3,315.30
41.45
101.90
3,169.31
3,077.67
-157.38
556.08
5,947,144.745
631,852.285
3.37
587.27
3,338.90
42.05
101.96
3,186.92
3,095.28
-160.83
581.46
5,947,141.765
631,867.713
2.55
602.92
3,361.20
42.33
101.95
3,203.44
3,111.80
-163.73
596.11
5,947,138.919
631,882.415
1.26
617.83
3,380.40
42.58
101.92
3,217.60
3,125.96
-166.41
608.79
5,947,136.460
631,895.139
1.31
630.73
3,397.40
43.07
101.82
3,230.07
3,138.43
-168.79
620.10
5,947,134.281
631,906.487
2.91
642.24
3,414.70
43.68
101.61
3,242.65
3,151.01
-171.20
631.73
5,947,132.072
631,918.160
3.62
654.06
3,432.10
44.02
101.44
3,255.20
3,163.56
-173.61
643.54
5,947,129.870
631,930.010
2.07
666.05
1/6/2019 12:45:34PM
Page 9
COMPASS
5000.1 Build
81D
1#2
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Co-ordinate Reference:
Well P-04
Project:
PBU
TV0 Reference:
KB @ 91.64usft (P -04A)
Sib:
P
MD Reference:
KB @ 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Weill
P -04A
Survey Calculation Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK- Alaska PROD -ANCPI
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
N/S
EIW
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
3,449.40
44.18
101.29
3,267.62
3,175.98
-175.98
655.35
5,947,127.704
631,941.852
1.10
678.03
3,466.80
44.33
101.17
3,280.08
3,188.44
-178.35
667.26
5,947,125.548
631,953.801
0.99
690.10
3,484.10
44.38
101.08
3,292.45
3,200.81
-180.68
679.12
5,947,123.422
631,965.706
0.46
702.13
3,501.40
44.33
100.99
3,304.82
3,213.18
-183.00
690.99
5,947,121.314
631,977.614
0.46
714.15
3,518.80
44.27
100.90
3,317.27
3,225.63
-185.30
702.93
5,947,119.215
631,989.583
0.50
726.23
3,536.10
44.33
100.84
3,329.66
3,238.02
-187.58
714.79
5,947,117.144
632,001.486
0.42
738.23
3,553.80
44.47
100.84
3,342.30
3,250.66
-189.91
726.95
5,947,115.028
632,013.687
0.79
750.54
3,572.50
44.58
100.85
3,355.63
3,263.99
-192.38
739.83
5,947,112.786
632,026.605
0.59
763.57
3,591.15
44.77
100.85
3,368.90
3,277.26
-194.85
752.71
5,947,110.543
632,039.523
1.02
776.60
3,610.10
44.98
100.86
3,382.32
3,290.68
-197.36
765.84
5,947,108.254
632,052.695
1.11
789.88
3,629.75
45.18
100.91
3,396.20
3,304.56
-199.99
779.51
5,947,105.866
632,066.402
1.03
803.71
3,649.55
45.42
101.00
3,410.13
3,318.49
-202.67
793.32
5,947,103.433
632,080.262
1.25
817.70
3,669.30
45.70
101.09
3,423.96
3,332.32
-205.37
807.16
5,947,100.973
632,094.146
1.45
831.72
3,689.15
45.98
101.19
3,437.78
3,346.14
-208.12
821.14
5,947,098.466
632,108.163
1.46
845.87
3,709.00
46.20
101.25
3,451.55
3,359.91
-210.90
835.16
5,947,095.928
632,122.235
1.13
860.09
3,728.75
46.35
101.30
3,465.20
3,373.56
-213.69
849.16
5,947,093.383
632,136.278
0.78
874.29
3,748.50
46.43
101.39
3,478.82
3,387.18
-216.51
863.18
5,947,090.815
632,150.344
0.52
888.51
3,768.60
46.52
101.50
3,492.67
3,401.03
-219.40
877.46
5,947,088.173
632,164.676
0.60
903.01
3,789.60
46.63
101.59
3,507.10
3,41546
-222.45
692,41
5,947,085.381
632,179.669
0.61
918.18
3,810.75
46.80
101.69
3,521.60
3,429.96
-225.56
907.49
5,947,082.539
632,194.799
0.87
933.50
3,831.85
46.97
101.89
3,536.02
3,444.38
-228.70
922.56
5,947,079.655
632,209.928
1.06
948.83
3,853.05
47.08
102.35
3,550.48
3,458.84
-231.96
937.73
5,947,076.663
632,225.146
1.67
964.28
3,874.25
47.20
103.05
3,564.90
3,473.26
-235.38
952.89
5,947,073.512
632,240.362
2.49
979.77
3,895.50
47.27
103.57
3,579.33
3,487.69
-238.97
968.07
5,947,070.186
632,255.602
1.83
995.33
3,916.75
47.35
103.85
3,593.73
3,502.09
-242.67
983.25
5,947,066.750
632,270.838
1.04
1,010.92
3,938.00
47.37
104.03
3,608.13
3,516.49
-246.44
998.42
5,947,063.249
632,266.072
0.63
1,026.53
3,959.30
47.30
104.19
3,622.56
3,530.92
-250.25
1,013.61
5,947,059.697
632,301.325
0.64
1,042.17
182019 12.4534PM Page 10 COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company:
North America - ALASKA- BP
Local Co-ordinate Reference:
Well P-04
Project:
PBU
TVD Reference
KB @ 91.64usft (P -04A)
Site:
P
MD Reference:
KB @ 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/VV
Northing
Essting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
3,980.55
47.25
104.34
3636.98
3,545.34
-254.10
1,028.74
5,947,056.115
632,316.517
0.57
1,057.75
4,001.80
47.25
104.36
3,651.41
3,559.77
-257.97
1,043.85
5,947,052.512
632,331.699
0.07
1,073.34
4,022.85
47.30
104.37
3,665.69
3,574.05
-261.81
1,058.83
5,947,048.937
632,346.743
0.24
1,088.78
4,043.70
47.38
104.36
3,679.82
3,588.18
-265.61
1,073.69
5,947,045.393
632,361.659
0.39
1,104.09
4,064.25
47.45
104.33
3,693.72
3,602.08
-269.36
1,088.35
5,947,041.901
632,376.379
0.36
1,119.20
4,084.95
47.45
104.28
3,707.72
3,616.08
-273.13
1,103.12
5,947,038.391
632,391.218
0.18
1,13443
4,105.95
47.33
104.18
3,721.94
3,630.30
-276.92
1,118.10
5,947,034.854
632,406.262
0.67
1,149.87
4,126.85
47.27
104.11
3,736.11
3,644.47
-280.68
1,133.00
5,947,031.361
632,421.218
0.38
1,165.20
4,147.75
47.02
104.09
3,750.33
3,658.69
-284.41
1,147.86
5,947,027.889
632,436.140
1.20
1,180.50
4,168.70
48.70
104.06
3,764.65
3,673.01
-288.13
1,162.69
5,947,024.431
632,451.029
1.53
1,195.76
4,189.70
46.68
104.02
3,779.06
3,687.42
-291.84
1,177.51
5,947,020.983
632,465.914
0.17
1,211.02
4,210.70
48.80
104.02
3,793.45
3,701.81
-295.54
1,192.35
5,947,017.537
632,480.613
0.57
1,226.29
4,231.70
48.85
104.06
3,807.82
3,716.18
-299.26
1,207.20
5,947,014.082
632,495.732
0.28
1,241.58
4,252.75
46.95
104.10
3,822.20
3,730.56
-303.00
1,222.11
5,947,010.604
632,510.702
0.49
1,256.92
4,273.80
47.13
104.13
3,836.54
3,744.90
-308.75
1,237.05
5,947,007.108
632,525.704
0.86
1,272.30
4,294.80
47.08
104.16
3,850.84
3,759.20
-310.51
1,251.97
5,947,003.610
632,540.684
0.26
1,287.66
4,315.80
46.92
104.18
3,865.16
3,773.52
-314.27
1,266.86
5,947,000.110
632,555.637
0.77
1,303.00
4,336.90
46.80
104.21
3,879.59
3,787.95
-318.05
1,281.79
5,946,998.596
632,570.626
0.58
1,318.37
4,357.90
46.83
104.25
3,893.96
3,802.32
-321.81
1,296.63
5,946,993.092
632,585.530
0.20
1,333.66
4,379.00
47.08
104.27
3,908.36
3,816.72
-325.61
1,311.58
5,946,989.555
632,600.538
1.19
1,349.06
4,402.80
47.22
104.27
3,924.55
3,832.91
-329.91
1,328.49
5,946,985.550
632,617.519
0.59
1,366.49
4,426.60
47.18
104.32
3,940.72
3,849.08
-334.22
1,345.41
5,946,981.534
632,634.513
0.23
1,383.92
4,450.40
47.20
104.38
3,956.89
3,865.25
-338.55
1,362.32
5,946,977.502
632,651.499
0.20
1,401.36
4,474.05
47.27
104.42
3,972.95
3,881.31
-342.87
1,379.14
5,946,973.479
632,668.388
0.32
1,418.70
4,497.75
47.32
10445
3,989.02
3,897.38
-347.21
1,396.01
5,946,969.432
632,685.326
0.23
1,436.10
4,521.90
47.35
104.45
4,005.39
3,913.75
-351.64
1,413.20
5,946,965.302
632,702.596
0.12
1,453.83
4,546.40
47.47
104.48
4,021.97
3,930.33
-356.15
1,430.67
5,946,961.102
632,720.136
0.50
1,471.85
1/82019 12:45:34PM
Page 11
COMPASS 5000.1 Build 810
BP
bp Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate
Reference:
Well P-04
Project: PBU
TVD Reference:
KB @ 91.64usft (P -04A)
Site: P
MD Reference:
KB @ 91.64usft (P -04A)
Well: P-04
North Reference:
True
Wellbore: P -04A
Survey Calculation Method:
Minimum Curvature
Design: P -04A
Database:
EDM RSK-
Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(usft)
4,571.30
47.62
104.50
4,038.78
3,947.14
-360.74
1,448.46
5,946,956.816
632,737.999
0.61
1,490.20
4,598.70
47.63
104.53
4,057.25
3,965.61
-365.82
1,468.05
5,946,952.086
632,757.678
0.09
1,510.41
4,626.40
47.72
104.61
4,075.90
3,984.26
-370.97
1,487.87
5,946,947.281
632,777.584
0.39
1,530.87
4,661.30
47.93
104.71
4,099.33
4,007.69
-37251
1,512.89
5,946,941.173
632,802.715
0.64
1,556.71
4,696.35
48.30
104.86
4,122.73
4,031.09
-384.17
1,538.12
5,946,934.955
632,828.055
1.10
1,58278
4,730.35
48.70
105.09
4,145.26
4,053.62
-390.75
1,562.72
5,946,928.806
632,852.764
1.28
1,608.22
4,764.70
49.08
105.29
4,167.84
4,076.20
-397.53
1,587.70
5,946,922.461
632,877.853
1.19
1,634.08
4,799.15
49.45
105.39
4,190.33
4,098.69
-404.44
1,612.87
5,946,915.996
632,903.141
1.10
1,660.17
4,833.85
49.63
105.44
4,212.84
4,121.20
-011.46
1,638.33
5,946,909.423
632,928.710
0.53
1,686.56
4,868.55
49.62
105.48
4,235.32
4,143.68
418.50
1,663.81
5,946,902.823
632,954.306
0.09
1,712.98
4,903.25
49.72
105.51
4,257.78
4,166.14
425.57
1,689.30
5,946,896.202
632,979.914
0.30
1,739.42
4,938.00
49.98
105.53
4,280.18
4,188.54
432.68
1,714.89
5,946,889.542
633,005.625
0.75
1,765.97
4,972.85
50.17
105.50
4,302.55
4,210.91
-439.83
1,740.64
5,946,882.844
633,031.496
0.55
1,792.68
5,007.85
50.03
105.48
4,325.00
4,233.36
447.00
1,766.52
5,946,876.126
633,057.490
0.40
1,819.52
5,042.85
49.93
105.53
4,347.51
4,255.87
454.16
1,792.35
5,946,859.413
633,083.438
0.31
1,846.31
5,077.95
50.13
105.57
4,370.06
4,278.42
461.37
1,818.26
5,946,862.655
633,109.473
0.58
1,873.20
5,112.95
50.17
105.65
4,392.48
4,300.84
468.61
1,844.14
5,946,855.877
633,135.472
0.21
1,900.06
5,148.05
50.17
105.75
4,414.97
4,323.33
-475.90
1,870.09
5,946,849.037
633,161.542
0.22
1,927.00
5,183.25
50.20
105.80
4,437.50
4,345.86
-483.25
1,896.11
5,946,842.142
633,187.684
0.14
1,954.03
5,218.35
50.10
105.79
4,460.00
4,368.36
-490.58
1,922.04
5,946,835.261
633,213.735
0.29
1,980.97
5,253.50
50.05
105.79
4,482.55
4,390.91
-497.92
1,947.98
5,946,828.380
633,239.796
0.14
2,007.91
5,288.65
50.13
105.75
4,505.11
4,413.47
-505.25
1,973.92
5,946,821.507
633,265.865
0.24
2,034.86
5,323.75
49.93
105.55
4,527.65
4,436.01
-512.50
1,999.83
5,946,814.703
633,291.888
0.72
2,061.75
5,358.55
49.85
105.39
4,550.07
4,458.43
-519.60
2,025.48
5,946,808.053
633,317.657
0.42
2,088.35
5,392.70
50.02
105.41
4,572.05
4,480.41
-526.54
2,050.68
5,946,601.554
633,342.969
0.50
2,114.48
5,427.05
50.00
105.49
4,594.13
4,502.49
-533.55
2,076.04
5,946,794.987
633,368.452
0.19
2,140.78
5,461.45
50.00
105.53
4,616.24
4,524.60
-540.60
2,101.43
5,946,788.384
633,393.961
0.09
2,167.12
1/6/2019 12:45:34PM
Page 12
COMPASS 5000.1 Build BID
BP
by Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate Reference:
Well P-04
Project: PBU
TVD Reference:
KB @ 91.64usft (P -04A)
Site: P
MD Reference:
KB @ 91.64usft (P -04A)
Well: P-04
North Reference:
True
Wellbore: P -04A
Survey Calculation Method:
Minimum Curvature
Design: P -04A
Database:
EDM RSK-
Alaska PROD -ANCPI
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
N/S
ENV
Northing
Easting
DLeg
V. Sec
(usft)
V)
(I
Waft)
(usft)
(usft)
(usft)
(usft)
(usft)
('1100usft)
tys8)
5,495.95
49.98
105.50
4,638.42
4,548.78
-547.67
2,126.90
5,946,781.761
633,419.540
0.09
2,193.53
5,53045
49.92
105.48
4,660.82
4,568.98
-554.72
2,152.35
5,946,775.154
633,445.107
0.18
2,219.93
5,564.95
49.93
105.49
4,682.83
4,591.19
-561.77
2,177.79
5,946,768.551
633,470.665
0.04
2,246.31
5,599.25
49.93
105.51
4,704.91
4,613.27
-568.79
2,203.08
5,946,761.979
633,496.076
0.04
2,272.55
5,633.55
49.83
105.56
4,727.02
4,635.38
-575.81
2,228.35
5,946,755.396
633,521.463
0.31
2,298.76
5,667.75
49.83
105.64
4,749.08
4,657.44
-582.84
2,253.52
5,946,748.809
633,546.750
0.18
2,324.89
5,702.05
50.02
105.72
4,771.16
4,679.52
-589.93
2,278.79
5,946,742.158
633,572.138
0.58
2,351.12
5,736.40
50.20
105.79
4,793.19
4,701.55
-597.09
2,304.16
5,946,735.445
633,597.623
0.55
2,377.47
5,770.75
50.32
105.82
4,815.15
4,723.51
-604.28
2,329.57
5,946,728.696
633,623.157
0.36
2,403.87
5,805.05
50.35
105.82
4,837.04
4,745.40
-611.48
2,354.98
5,946,721.942
633,648.680
0.09
2,430.27
5,839.35
50.27
105.80
4,858.95
4,767.31
-618.67
2,380.37
5,946,715.196
633,674.196
0.24
2,456.65
5,873.75
50.23
105.78
4,880.94
4,789.30
-625.87
2,405.82
5,946,708.444
633,699.765
0.12
2,483.09
5,908.05
50.27
105.75
4,902.88
4,811.24
-633.03
2,431.20
5,946,701724
633,725.264
0.13
2,509.45
5,942.35
50.23
105.72
4,924.81
4,833.17
-640.18
2,456.56
5,946,695.016
633,750.765
0.13
2,535.81
5,976.65
50.25
105.73
4,946.75
4,855.11
-647.33
2,481.97
5,946 688 314
633,776.265
0.06
2,562.17
6,010.85
50.32
105.77
4,968.60
4,876.96
-654.47
2,507.29
5,946,681.617
633,801.703
0.22
2,588.47
6,044.25
50.28
105.76
4,989.93
4,898.29
-661.45
2,532.02
5,946,675.067
633,826.551
0.12
2,614.16
6,078.05
50.18
105.72
5,011.56
4,919.92
-666.50
2,557.02
5,946,668.458
633,851.673
0.31
2,640.13
6,111.65
50.10
105.67
5,033.09
4,941.45
-675.48
2,581.85
5,946,661.915
633,876.619
0.26
2,665.91
6,145.40
50.02
105.58
5,054.76
4,963.12
-682.45
2,606.77
5,946,655.361
633,901.555
0.31
2,691.78
6,179.05
49.85
105.48
5,076.42
4,984.78
-689.34
2,631.58
5,946,648.921
633,926.582
0.55
2,717.52
6,212.85
49.75
105.46
5,098.23
5,006.59
-696.23
2,656.47
5,946,642.470
633,951.577
0.30
2,743.32
6,246.65
49.75
105.42
5,120.07
5,028.43
-703.10
2,681.33
5,946,636.037
633,976.558
0.09
2,769.10
6,279.85
49.65
105.37
5,141.54
5,049.90
-709.82
2,705.74
5,946,629.742
634,001.081
0.32
2,794.41
6,311.90
49.55
105.37
5,162.32
5,070.68
-716.29
2,729.28
5,946,623.685
634,024.723
0.31
2,818.80
6,343.90
49.57
105.36
5,183.07
5,091.43
-722.74
2,752.76
5,946,617.643
634,048.314
0.07
2,843.14
6,375.90
49.53
105.33
5,203.84
5,112.20
-729.19
2,776.25
5,946,611.610
634,071.904
0.14
2,867.48
IM019 12'45:34PM
Page 13
COMPASS
5000.1 Build 81D
BP
by Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate
Reference:
Well P-04
Project: PBU
ND Reference:
KB Q 91.64usft (P -04A)
Site: P
MD Reference:
KB @ 91.64usft (P -04A)
Well: P-04
North Reference:
True
Wellbore: P -04A
Survey Calculation Method:
Minimum Curvature
Design: P -04A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
AN (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting DLeg
V. Sec
(usR)
(°)
(°)
(usft)
(usR)
(usft)
(thrift)
(Ural[)
(uaft) (°MOOusR)
(ueft)
6,407.85
49.45
105.28
5,224.59
5,132.95
-735.60
2,799.68
5,946,605.608
634,095440
0.28
2,891.76
6,439.85
49.50
105.20
5,245.38
5,153.74
-741.99
2,823.14
5,946,599.625
634,119.015
0.25
2,916.07
6,471.70
49.58
105.14
5,266.05
5,174.41
-748.33
2,846.53
5,946,593.692
634,142.509
0.29
2,940.28
6,503.55
49.55
105.07
5,286.71
5,195.07
-754.65
2,869.94
5,946,587.785
634,168.018
0.19
2,964.51
6,535.30
49.45
105.04
5,307,33
5,215.69
-760.92
2,893.25
5,946,581.922
634,189.436
0.32
2,988.63
6,567.25
49.40
105.06
5,328.11
5,236.47
-767.22
2,916.69
5,946,576.030
634,212.976
0.16
3,012.88
6,599.25
49.33
105.08
5,348.95
5,257.31
-773.54
2,940.14
5,946,570.127
634,236.530
0.22
3,037.14
6,631.30
49.47
105.10
5,369.81
5,278.17
-779.87
2,963.63
5,946,554.203
634,260.130
0.44
3,061.46
6,662.85
49.77
105.10
5,390.25
5,298.61
-786.13
2,986.84
5,946,558.348
634,283.438
0.95
3,085.48
6,694.20
49.88
105.05
5,410.47
5,318.83
-792.36
3,009.96
5,946,552.523
634,306.671
0.37
3,109.41
6,725.70
49.93
105.00
5,430.76
5,339.12
-798.61
3,033.24
5,946,546.683
634,330.047
0.20
3,133.49
6,757.15
49.90
105.01
5,451.01
5,359.37
-604.84
3,056.48
5,946,540.860
634,353.392
0.10
3,157.53
6,788.65
49.70
105.03
5,471.34
5,379.70
-811.07
3,079.72
5,946,535.031
634,376.733
0.64
3,181.57
6,820.05
49.77
105.06
5,491.64
5,400.00
-817.29
3,102.86
5,946,529.217
634,399.975
0.23
3,205.52
6,851.50
49.78
105.08
5,511.95
5,420.31
-823.54
3,126.04
5,946,523.379
634,423.265
0.06
3,229.51
6,882.95
49.57
105.10
5,532.30
5,440.66
-829.78
3,149.19
5,946,517.542
634,446.519
0.67
3,25347
6,914.30
49.48
105.12
5,552.65
5,461.01
-836.00
3,172.22
5,946,511.729
634,469.645
0.29
3,277.30
6,945.70
49.30
105.12
5,573.09
5,481.45
-842.21
3,195.23
5,946,505.914
634,492.760
0.57
3,301.12
6,977.10
49.13
105.10
5,593.60
5,501.96
-848.41
3,218.18
5,946,500.118
634,515.816
0.54
3,324.88
7,008.45
49.22
105.10
5,614.09
5,522.45
-854.59
3,241.09
5,946,494.339
634,538.822
0.29
3,348.58
7,039.85
49.22
105.06
5,634.60
5,542.%
-860.78
3,264.04
5,946,488.554
634,561.883
0.10
3,372.34
7,071.25
49.05
105.01
5,655.15
5,563.51
-866.94
3,286.98
5,946,482.796
634,584.918
0.55
3,396.07
7,102.60
49.00
105.01
5,675.70
5,584.06
-873.07
3,309.84
5,946,477.066
634,607.881
0.16
3,419.72
7,134.00
49.02
105.01
5,696.30
5,604.66
-679.20
3,332.73
5,946,471.328
634,630.876
0.06
3,443.40
7,165.30
49.02
105.01
5,716.63
5,625.19
-885.32
3,355.55
5,946,465.607
634,653.801
0.00
3,467.01
7,196.70
49.07
105.05
5,737.41
5,645.77
-891.47
3,378.46
5,946,459.858
634,676.805
0.19
3,490.71
7,228.10
49.15
105.03
5,757.96
5,666.32
-897.63
3,401.38
5,946,454.100
634,699.832
0.26
3,514.43
1/8/2019 12:45:34PM
Page 14
COMPASS
5000.1 Build BID
am
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Co-ordinate
Reference:
Well P-04
Project:
Pau
TVD Reference',
KB @ 91.64usft (P -04A)
Site:
P
MD Reference:
KB @ 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation
Method:
Minimum Curvature
Design:
P -04A
Database:
EDM R5K-Alaska PROD -ANCP1
Survey
MD
Inc
AN (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easting DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft) (°1100usft)
(usft)
7,259.50
49.08
104.95
5,778.51
5,686.87
-903.77
3424.31
5,946,448.361
634,722.865
0.29
3,538.15
7,290.40
48.87
104.94
5,798.78
5,707.14
-909.79
3,446.85
5,946,442.739
634,745.505
0.36
3,561.46
7,321.00
48.97
104.98
5,818.86
5,727.22
-915.75
3,469.15
5,946,437.170
634,767.904
0.10
3,584.52
7,351.80
48.93
104.94
5,839.09
5,747.45
-921.75
3,491.59
5,946,431.567
634,790.444
0.16
3,607.73
7,382.60
48.85
104.87
5,859.34
5,767.70
-927.71
3,514.02
5,946,425.990
634,812.968
0.31
3,630.91
7,413.40
48.85
104.83
5,879.61
5,787.97
-933.66
3,536.44
5,946,420.439
634,835.484
0.10
3,654.08
7,444.15
48.80
104.75
5,899.85
5,808.21
-939.57
3,558.82
5,946,414.922
634,857.961
0.25
3,677.21
7,474.90
48.62
104.67
5,920.15
5,828.51
-945.43
3,581.16
5,946,409.446
634,880.405
0.82
3,700.29
7,505.65
48.43
104.59
5,940.51
5,848.87
-951.25
3,603.46
5,946,404.016
634,902.794
0.65
3,723.30
7,536.45
48.33
104.49
5,960.97
5,869.33
-957.03
3,625.74
5,946,398.826
634,925.177
0.41
3,746.30
7,567.25
48.22
104.43
5,981.47
5,889.83
-962.77
3,648.00
5,946,393.275
634,947.531
0.39
3,76926
7,598.05
48.07
104.44
6,002.02
5,910.38
-968.49
3,670.22
5,946,387.945
634,969.843
0.49
3,792.17
7,628.90
47.93
104.45
6,022.66
5,931.02
-974.21
3,692.42
5,946,382.615
634,992.138
0.45
3,815.07
7,659.75
47.85
104.41
6,043.35
5,951.71
-979.91
3,714.58
5,946,377.299
635,014.397
0.28
3,837.93
7,690.55
47.75
104.42
6,064.04
5,972.40
-985,59
3,736.68
5,946,372.006
635,036.589
0.33
3,860.71
7,721.45
47.58
104.48
6,084.85
5,993.21
-991.29
3,758.80
5,946,366.693
635,058.803
0.57
3,883.53
7,752.30
47.45
104.54
6,105.68
6,014.04
-996.99
3,780.83
5,946,361.378
635,080.922
0.45
3,906.25
7,783.25
47.33
104.62
6,126.64
6,035.00
-1,002.73
3,802.87
5,946,356.030
635,103.062
0.43
3,929.00
7,814.10
47.10
104.69
6,147.59
6,055.95
-1,008.46
3,824.78
5,946,350.685
635,125.061
0.76
3,95162
7,845.05
46.80
104.73
6,168.72
6,077.08
-1,014.20
3,846.65
5,946,345.325
635,147.032
0.97
3,974.22
7,875.95
46.58
104.74
6,189.91
6,098.27
-1,019.92
3,868.40
5,946,339.986
635,168.871
0.71
3,996.68
7,906.60
46.47
104.78
6,211.00
6,119.36
-1,025.59
3,889.91
5,946,334.696
635,190.473
0.37
4,018.90
7,936.85
46.33
104.76
6,231.86
6,140.22
-1,031.17
3,911.09
5,946,329.482
635,211.748
0.47
4,04078
7,967.15
46.15
104.75
6,252.82
6,161.18
-1,036.74
3,932.25
5,946,324,279
635,233.003
0.59
4,06264
7,997.45
45.98
104.80
6,273.84
6,182.20
-1,042.31
3,953.35
5,946,319.083
635,254.193
0.57
4,084.44
8,027.75
45.78
104.84
6,294.94
6,203.30
-1,047.87
3,974.38
5,946,313.887
635,275.313
0.67
4,106.17
8,057.94
45.62
104.90
6,316.02
6,224.38
-1,053.42
3,995.26
5,946,308.708
635,296.288
0.55
4,127.76
1WO19 12:45:34PM Page 15 COMPASS 5000.1 Build 81D
BP
by Final Survey Report
Company: North America - ALASKA - BP
Local Coordinate
Reference:
Well P-04
Project: PSU
ND Reference:
KB Q 91.64usft (P -04A)
Site: P
MD Reference:
KB Q? 91.64usft (P -04A)
Well: P-04
North Reference:
True
Wellbore: P -04A
Survey Calculation Method:
Minimum Curvature
Design: P -04A
Database:
EDM RSK-
Alaska PROD -ANCPI
Survey
MD
Inc
Azi (azimuth)
ND
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(waft)
(usft)
(°I100uaft)
(usft)
8,088.15
45.55
104.90
6,337.16
6,245.52
-1,056.97
4,016.11
5,946,303.524
635,317.233
0.23
4,149.32
8,118.25
45.40
104.93
6,358.27
6,266.63
-1,06449
4,036.85
5,946,298.364
635,338.062
0.50
4,170.76
8,148.25
45.30
105.01
6,379.35
6,287.71
-1,070.00
4,057.47
5,946,293.211
635,358.771
0.38
4,192.09
8,178.45
45.22
105.03
6,400.61
6,308.97
-1,075.56
4,078.19
5,946,288.015
635,379.581
0.27
4,213.52
8,208.65
45.10
105.07
6,421.91
6,330.27
-1,081.12
4,098.87
5,946,282.816
635,400.353
0.41
4,234.92
8,238.75
44.88
105.16
6,443.19
8,351.55
-1,086.67
4,119.41
5,946,277.627
635,420.989
0.76
4,256.18
8,269.05
44.65
105.26
6,464.71
6,373.07
-1,092.27
4,140.00
5,946,272.389
635,441.672
0.79
4,277.51
8,299.35
44.58
105.37
6,486.28
6,394.64
-1,097.89
4,160.52
5,946,267.127
635,462.290
0.34
4,298.77
8,329.54
44.58
105.52
6,507.78
6,416.14
-1,103.53
4,180.95
5,946,261.842
635,482.809
0.35
4,319.95
8,359.79
44.55
105.60
6,529.33
6,437.89
-1,109.23
4,201.40
5,946,256.505
635,503.353
0.21
4,341.17
8,390.04
44.48
105.60
6,550.90
6,459.26
-1,114.93
4,221.83
5,946,251.159
635,523.874
0.23
4,362.37
8,420.29
44.43
105.67
6,572.49
6,480.85
-1,120.84
4,242.23
5,946,245.807
635,544.371
0.23
4,383.55
8,450.60
44.45
105.75
6,594.14
6,502.50
-1,128.39
4,262.66
5,946,240.418
635,564.895
0.20
4,404.76
8,480.90
44.43
105.78
6,615.77
6,524,13
-1,132.15
4,283.07
5,948,235.012
635,585.408
0.10
4,425.97
8,511.10
44.35
105.84
6,637.35
6,545.71
-1,137.91
4,30340
5,946,229.612
635,605.830
0.30
4,447.09
8,540.70
44.33
106.00
6,658.52
6,566.88
-1,143.58
4,323.30
5,946,224.285
635,625.819
0.38
4,467.77
8,570.40
44.30
106.11
6,679.77
6,588.13
-1,149.32
4,343.23
5,946,218.896
635,645.854
0.28
4,488.51
8,600.20
44.10
106.20
6,701.13
6,609.49
-1,155.10
4,363.19
5,946,213.465
635,665.905
0.70
4,50928
8,629.80
43.77
106.37
6,722.45
6,630.81
-1,160.86
4,382.90
5,946,208.051
635,685,715
1.18
4,529.82
8,659.54
43.50
106.58
6,743.97
6,652.33
-1,166.68
4,402.58
5,946,202.575
635,705.491
1.03
4,550.34
8,689.25
43.42
106.60
6,765.54
6,673.90
-1,172.55
4,422.16
5,946,197.049
635,725.164
0.58
4,57077
8,718.95
43.47
106.93
6,787.10
6,695.46
-1,178.47
4,441.70
5,946,191.466
635,744.808
0.34
4,591.19
8,748.60
43.42
107.07
6,808.63
6,716.99
-1,184.43
4,461.20
5,946,185.846
635,764.406
0.37
4,611.58
8,778.35
43.25
107.25
6,830.27
6,738.63
-1,190.46
4,480.71
5,946,180.164
635,784.014
0.71
4,632.00
8,808,05
43.05
107.47
6,851.94
6,760.30
-1,196.52
4,500.10
5,946,174.443
635,803.502
0.84
4,652.31
8,837.75
42.83
107.74
6,873.68
6,782.04
-1,202.64
4,519.38
5,946,168.861
635,822.889
0.97
4,672.54
8,867.40
42.53
108.06
6,895.48
6,803.84
-1,208.81
4,538.51
5,946,162.819
635,842.119
1.25
4,692.64
1/8/201912:45:34PM
Page 16
COMPASS 5000.1 Build 81D
BP
bp Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well P-04
Project:
PBU
TVD Reference:
KB @ 91.64usft (P -04A)
Site:
P
MD Reference:
KB @ 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK-
Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
(usft)
C)
(')
(usft)
(usft)
(us@)
(usf)
(usft)
(usft)
(•1100ustt)
(usft)
8,897.15
42.30
108.36
6,917.44
6,825.80
-1,215.08
4,557.57
5,946,156.882
635,861.285
1.03
4,712.71
8,928.95
42.12
108.67
6,939.51
6,847.87
-1,221.44
4,576.55
5,946,150.857
635,880.376
0.92
4,732.72
8,956.75
41.88
109.07
6,961.66
6,870.02
-1,227.89
4,595.42
5,946,144.738
635,899.353
1.21
4,752.66
8,986.54
41.60
109.44
6,983.89
6,892.25
-1,234.43
4,614.15
5,946,138.526
635,918.186
1.25
4,772.48
9,016.35
41.37
109.71
7,006.22
6,914.58
-1,241.05
4,632.75
5,946,132.236
635,938.902
0.98
4,792.21
9,046.14
41.22
109.90
7,028.60
6,936.96
-1,247.71
4,651.25
5,946,125.899
635,955.511
0.66
4,811.85
9,075.95
41.15
110.04
7,051.04
6,959.40
-1,254.41
4,669.70
5,946,119.518
635,974.073
0.39
4,831.46
9,105.75
41.03
110.12
7,073.49
6,981.85
-1,261.14
4,688.09
5,946,113.116
635,992.581
0.44
4,851.02
9,135.14
40.87
110.22
7,095.69
7,004.05
-1,267.78
4,706.17
5,946,106.791
636,010.773
0.59
4,870.26
9,164.35
40.90
110.29
7,117.78
7,026.14
-1,274.40
4,724.11
5,946,100.487
636,028.822
0.19
4,889.35
9,193.54
41.00
110.29
7,139.82
7,048.18
-1,281.03
4,742.05
5,946,094.167
636,046.877
0.34
4,908.46
9,222.79
40.87
110.36
7,161.92
7,070.28
-1,287.69
4,760.03
5,946,087.825
636,064.960
0.47
4,927.80
9,252.00
40.55
110.44
7,184.08
7,092.42
-1,294.33
4,777.88
5,946,081497
636,082.929
1.11
4,946.62
9,281.20
40.22
110.55
7,206.30
7,11486
-1,300.95
4,795.60
5,946,075.184
636,100.762
1.16
4,965.51
9,310.39
40.03
110.69
7,228.62
7,136.98
-1,307.58
4,813.21
5,946,068.867
636,118.480
0.72
4,984.29
9,339.70
39.98
110.91
7,251.07
7,159.43
-1,314.27
4,830.82
5,946,062.485
636,136.207
0.51
5,003.10
9,368.89
39.95
111.21
7,273.45
7,181.81
-1,321.01
4,848.32
5,946,056.054
636,153.817
0.67
5,021.81
9,398.10
39.95
111.40
7,295.84
7,204.20
-1,327.82
4,865.80
5,946,049.546
636,171.406
0.42
5,040.52
9,427.29
39.82
111.51
7,318.24
7,226.80
-1,334.67
4,883.22
5,946,043.004
636,188.942
0.51
5,059.18
9,456.49
39.55
111.75
7,340.71
7,249.07
-1,341.54
4,900.55
5,946,036.435
636,206.391
1.06
5,077.78
9,485.70
39.30
112.01
7,363.27
7,271.63
-1,348.45
4,917.76
5,946,029.824
636,223.722
1.03
5,096.27
9,515.00
39.10
112.33
7,385.98
7,294.34
-1,355.44
4,934.91
5,946,023.137
636,240.989
0.97
5,114.72
9,544.20
39.00
112.75
7,408.66
7,317.02
-1,362.49
4,951.90
5,946,016.383
636,258.099
0.97
5,133.04
9,573.39
39.00
113.22
7,431.34
7,339.70
-1,369.67
4,968.82
5,946,009.506
636,275.131
1.01
5,151.32
9,602.45
39.00
113.75
7,453.92
7,362.28
-1,376.95
4,985.59
5,946,002.513
636,292.027
1.15
5,169.50
9,631.50
39.03
114.31
7,476.50
7,384.86
-1,384.40
5,002.29
5,945,995.359
636,308.856
1.22
5,187.66
9,660.54
39.23
114.87
7,499.02
7,407.38
-1,392.03
5,018.96
5,945,988.025
636,325.649
1.40
5,205.84
1/8@019 12:45
34P
Page 17
COMPASS
5000 1 Build 81D
BP
Final Survey Report
Company:
North America - ALASKA -aP
Local Coordinate Reference:
Well P-04
Project:
PBU
TVD Reference:
KB @ 91.64usft (P -04A)
Site:
P
MD Reference:
KB @ 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
NDSS
N/S
E/W
Northing
EaMing
DLeg
V. Sec
(usft)
V)
C)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(Wousft)
(usft)
9,689.64
39.45
115.45
7,521.53
7429.89
-1,399.87
5,035.65
5,945,980.475
636,342479
1.47
5,224.11
9,718.45
39.80
116.02
7,543.75
7,452.11
-1,407.83
5,052.17
5,945,972.803
636,359.130
1.36
5,242.25
9,747.04
39.78
116.43
7,565.75
7,474.11
-1,415.90
5,068.55
5,945,965.022
636,375.646
1.11
5,260.29
9,775.60
39.93
116.69
7,587.68
7,496.04
-1,424.08
5,084.92
5,945,957.126
636,392.156
0.78
5,278.35
9,804.15
39.98
117.07
7,609.56
7,517.92
-1,432.37
5,101.27
5,945,949.124
636,408.650
0.87
5,29643
9,83275
40.05
117.57
7,631.46
7,539.82
-1,440.81
5,117.61
5,945,940.970
636,425.131
1.15
5,314.54
9,861.35
40.10
117.99
7,653.35
7,561.71
-1,449.39
5,133.90
5,945,932.675
636,441.567
0.96
5,332.65
9,889.85
40.10
118.37
7,675.15
7,583.51
-1,458.06
5,150.08
5,945,924.290
636,457.896
0.86
5,35067
9,918.54
40.08
118.77
7,697.10
7,605.46
-1,466.90
5,166.31
5,945,915.739
636,474.273
0.90
5,368.79
9,947.15
40.10
119.13
7,718.99
7,627.35
-1,475.82
5,182.43
5,945,907.104
636,490.547
0.81
5,386.84
9,975.85
40.23
119.51
7,740.92
7,649.28
-1,484.88
5,198.57
5,945,898.323
636,506.841
0.97
5,404.95
10,004.54
40.35
119.87
7,762.80
7,671.16
-1,494.07
5,214.69
5,945,889.416
636,523.114
0.91
5,423.07
10,033.25
40.53
120.18
7,784.65
7693.01
-1,503.39
5,230.81
5,945,880.381
636,539.397
0.94
5,441.23
10,061.89
40.85
120.50
7,808.37
7,714.73
-1,512.82
5,246.92
5,945,871.232
636,555.672
1.33
5,459.42
10,090.54
41.00
120.84
7,828.02
7,736.38
-1,522.40
5,263.07
5,945,861.943
636,571.978
0.94
5,477.68
10,119.25
40.85
121.32
7,849.71
7,758.07
-1,532.10
5,279.17
5,945,852.517
636,588.251
1.21
5,495.95
10,148.00
40.68
121.80
7,871.45
7,779.81
-1,541.95
5,295.20
5,945,842.954
636,604.447
1.10
5,514.18
10,176.95
40.97
122.13
7,893.33
7,801.69
-1,551.99
5,311.29
5,945,833.197
636,620.707
0.81
5,532.53
10,206.25
40.83
122.45
7,915.47
7,823.83
-1,562.24
5,327.51
5,945,823.234
636,637.099
0.86
5,551.06
10,235.54
40.70
122.69
7,937.66
7,846.02
-1,572.53
5,343.63
5,945,813.222
636,653.392
0.70
5,569.51
10,264.85
40.57
122.81
7,959.90
7,868.26
-1,582.86
5,359.68
5,945,803.178
636,669.622
0.52
5,587.91
10,293.95
40.45
122.92
7,982.02
7,890.38
-1,593.12
5,375.56
5,945,793.199
636,685.674
0.48
5,606.12
10,322.65
40.32
123.06
8,003.88
7,912.24
-1,603.24
5,391.15
5,945,783.349
636,701.444
0.55
5,624.02
10,351.20
40.17
123.18
8,025.68
7,934.04
-1,613.32
5,406.60
5,945,773.542
636,717.065
0.59
5,641.77
10,379.64
40.13
123.17
8,047.41
7,955.77
-1,623.35
5,421.95
5,945,763.778
636,732.585
0.14
5,659.41
10,408.04
40.13
122.98
8,069.13
7,977.49
-1,633.34
5,437.29
5,945,754.058
636,748.094
0.43
5,677.02
10,436.70
40.03
122.72
8,091.06
7,999.42
-1,643.35
5,452.79
5,945,744,321
636,763.767
0.68
5,694.80
1WO19 12:45:34PM Page 18 COMPASS 5000.1 Build 81D
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Co-ommate
Reference:
Well P-04
Project:
Pau
TVD Reference:
KB @ 91.64usft (P -04A)
Site:
P
MD Reference:
KB @ 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
NIS
EIW
Northing
Easang DLeg
V. Sac
(usft)
V)
(°)
(usft)
(usft)
(usit)
(usft)
(usft)
Wait) ('1101 ft)
Wal
10,465.35
39.90
122.55
8,113.02
8,021.38
-1,653.28
5,468.29
5,945,734.669
636,779.434
0.59
5,712.55
10,493,95
39.82
122.45
8,134.97
8,043.33
-1,663.13
5,483.75
5,945,725.092
636,795.061
0.36
5,730.24
10,522.54
39.73
122.40
8,156.94
8,065.30
-1,672.93
5,499.19
5,945,715.556
636,810.668
0.33
5,747.89
10,551.20
39.67
122.52
8,178.99
8,087.35
-1,682.76
5,514.63
5,945,706.002
636,826.283
0.34
5,765.56
10,579.89
39.70
122.80
8,201.07
8,109.43
-1,692.65
5,530.06
5,945,698.387
636,841.875
0.63
5,783.23
10,606.59
39.47
122.96
6,223.19
8,131.55
-1,702.58
5,545.42
5,945,686.729
636,857.403
0.88
5,800.851
10,637.29
39.23
123.15
8,245.38
8,153.74
-1,712.50
5,560.67
5,945,677.071
636,872.825
0.94
5,818.36
10,685.99
39.08
123.61
8,267.64
8,176.00
-1,722.47
5,575.80
5,945,667.367
636,888.128
1.14
5,83577
10,694.79
38.78
124.18
8,290.04
8,198.40
-1,732.56
5,590.82
5,945,657.540
636,903.322
1.82
5,853.12
10,723.54
38.57
124.83
8,312.49
8,220.85
-1,74274
5,605.63
5,945,647.623
636,918.301
1.59
5,87028
10,752.29
38.33
125.52
8,335.00
8,243.36
-1,753.04
5,620.24
5,945,637.582
636,933.090
1.71
5,887.30
10,780.99
38.05
126.11
8,35256
8,265.92
-1,763.42
5,634.63
5,945,627.452
636,942657
1.60
5,904.12
10,809.70
37.90
126.65
- 8,380.19
8,288.55
-1,773.90
5,648.85
5,945,617.224
636,962.059
1.27
5,920.82
10,838.60
38.27
127.28
8,402.94
8,311.30
-1,784.62
5,663.10
5,945,606.755
636,976.486
1.86
5,937.60
10,867.09
38.72
128.14
8,425.24
8,333.60
-1,795.47
5,677.12
5,945,596.155
636,990.700
2.45
5,954.22
10,895.34
38.72
129.27
8,447.28
8,355.64
-1,806.52
5,690.91
5,945,585.349
837,004.879
2.50
5,970.68
10,923.54
38.82
130.37
8,469.27
8,377.63
-1,817.82
5,704.48
5,945,574.280
637,018.435
2.47
5,986.99
10,951.70
39.32
130.97
8,491.13
8,399.49
-1,829.39
5,717.94
5,945,562.951
637,032.095
2.23
6,003.28
10,979.89
39.83
131.30
8,512.86
8,421.22
-1,841.21
5,731.46
5,945,551.375
637,045.824
1.96
6,019.71
11,008.14
40.17
131.65
8,534.50
8,442.86
-1,853.23
5,745.07
5,945,539.588
637,059.636
1.44
6,036.28
11,036.35
40.53
131.92
8,556.00
8,464.36
-1,865.40
5,758.69
5,945,527.658
637,073.464
1.42
6,052.90
11,064.54
41.02
131.98
8,577.35
8,485.71
-1,877.71
5,772.38
5,945,515.592
637,087.368
1.74
6,069.63
11,092.74
41.45
131.57
8,598.55
8,506.91
-1,890.09
5,786.24
5,945,503.454
637,101.443
1.80
6,086.55
11,120.79
41.87
130.86
8,619.51
8,527.87
-1,902.38
5,800.27
5,945,491.417
637,115.679
2.25
6,103.60
11,149.04
42.43
130.18
8,640.45
8,548.81
-1,914.69
5,814.68
5,945,479.354
637,130.302
2.56
6,121.02
11,177.24
43.17
129.67
8,661.14
8,569.50
-1,928.99
5,829.37
5,945,467.317
637,145.207
2.90
6,138.71
11,205.54
43.90
129.47
8,681.66
8,590.02
-1,939.41
5,844.40
5,945,455.165
637,160.446
2.63
6,156.74
1/8/2019 12:45:34PM
Page 19
COMPASS
5000.1 Build 81D
In
BP
Final Survey Report
Company:
North Amenca- ALASKA - BP
Local Coordinate Reference:
Well P-04
Project:
PBU
TVD Reference:
KB Q 91.64usft (P -04A)
Site:
P
MD Reference:
KB @ 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi (azimuth)
TVD
TVDSS
N/S
E/W
Northing
Easgng
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usit)
(usfq
11.233.85
44.35
129.41
8,701.98
8,610.34
-1,951.93
5,859.62
5,945,442.912
637,175.883
1.60
6,175.00
11,262.14
44.55
129.19
8722.18
8,630.54
-1,964.48
5,874.95
5,945,430.635
637,191.429
0.89
6,193.37
11,290.39
44.67
128.81
8,742.29
8,650.65
-1,978.96
5,890.37
5,945,418.421
637,207.061
1.04
6,211.81
11,318.74
44.75
128.22
8,762.44
8,670.80
-1,989.38
5,905.98
5,945,406.276
637,222.879
1.49
6,230.40
11,347.10
44.73
127.74
8,782.58
8,690.94
-2,001.67
5,921.71
5,945,394.269
637,238.825
1.19
6,249.08
11,375.49
44.62
127.48
8,802.77
8,711.13
-2,013.85
5,937.52
5,945,382.366
637,254.846
0.75
6,267.80
11,403.84
44.68
126.74
8,822.94
8,731.30
-2,025.87
5,953.41
5,945,370.625
637,270.940
1.85
6,286.54
11,431.94
44.78
125.74
8,842.90
8,751.26
-2,037.56
5,969.36
5,945,359.215
637,287.090
2.53
6,305.25
11,459.70
44.77
125.11
8,862.61
8,770.97
-2,048.89
5,985.29
5,945,348.163
637,303.216
1.60
6,323.83
11,487.49
44.98
124.71
8,882.30
8,790.66
-2,060.11
6,001.37
5,945,337.225
637,319.487
1.27
6,342.52
11,515.29
45.17
124.27
8,901,93
8,810.29
-2,071.26
6,017.60
5,945,326.364
637,335.901
1.31
6,361.32
11,517.00
45.16
124.24
8,903.14
8,811.50
-2,071.94
6,018.60
5945,325.700
637,336.915
1.37
6,362.48
11,540.26
49.18
124.28
8,918.95
8,827.31
-2,081.54
6,032.69
5945,316.346
637,351.175
17.28
6,378.80
11,570.09
59.18
124.32
8,936.38
8,844.74
-2,095.16
6,052.65
5,945,303.064
637,371.364
33.52
6,401.90
11,600.40
70.39
124.36
8,949.28
8,857.64
-2,110.60
6,075.26
5,945,288.037
637,394.234
36.98
6,428.07
11,630.28
83.14
127.18
8,956.10
8,864.46
-2,127.58
5,098.79
5,945,271.471
637,418.062
43.64
6,455.60
11,660.21
86.04
138.00
8,958.93
8,867.29
-2,147.72
6,120.69
5,945,251.720
637,440.305
37.27
6,482.49
11,689.92
83.91
149.23
8,961.54
8,869.90
-2,171.50
6,138.22
5,945,228.248
637,458.246
38.33
6,506.30
11,720.38
84.15
160.46
8,964.72
8,873.08
-2,198.88
6,151.08
5,945,201.102
637,471.576
36.68
6,526.72
11,749.74
83.97
172.67
8,967.77
8,876.13
-2,227.23
6,157.85
5,945,172.878
637,478.841
41.37
6,541.62
11,786.07
83.66
184.52
8,971.70
8,880.06
-2,263.27
6,158.73
5,945,136.860
637,480.354
32.44
6,553.19
11,813.55
85.08
192.00
8,974.40
8,882.76
-2,290.31
6,154.81
5,945,109.755
637,476.899
27.58
6,557.48
11,840.51
86.59
200.07
8,976.36
8,884.72
-2,316.13
6,147.38
5,945,083.812
637,469.928
30.37
6,558.07
11,871.25
84.37
209.82
8,978.79
8,887.15
-2,343.88
6,134.48
5,945,055.842
637,457.511
32.43
6,554.01
11,901.71
83.44
219.76
8,982.03
8,890.39
-2,368.72
6,117.22
5,945,030.703
637,440.691
32.59
6,544.92
11,931.28
83.85
231.11
8,985.31
8,893.67
-2,389.31
6,096.32
5,945,009.757
637,420.151
38.17
6,531.09
11,980.79
84.66
240.15
8,988.27
8,896.63
-2,405.87
6,072.11
5,944,992.782
637,396.235
30.60
6,512.90
1/8/2019 12:45:34PM Page 20 COMPASS 5000.1 Build BID
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well P-04
Project:
PBU
TVD Reference:
KB @ 91.64usft (P -04A)
Site:
P
MD Reference:
KB @ 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi(azimuth)
TVD
TVDSS
N/S
E/W
Northing
Easting
1311-e9
V. Sac
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(1100usR
(usft)
11.959.02
84.39
249.88
8,990.97
8,899.33
-2,417.72
6,04667
5,944,980486
637,371.008
34.32
6,492.14
12,020.56
83.73
259.34
8994.25
8,902.61
-2,426.04
6,016.46
5,944,971.644
637,340.949
29.91
6,465.77
12,050.32
82.16
268.02
8,997.91
8,90627
-2,429.29
5,987.13
5,944,967.881
637,311.688
29.42
6,438.74
12,082.50
80.98
278.66
9,002.64
8,911.00
-2,427.45
5,955.40
5,944,969.175
637,279.933
32.91
6,407.90
12,110.05
80.16
287.12
9,007.16
8,915.52
-2,421.39
5,928.94
5,944,974.767
637,253.366
30.44
6,380.82
12,142.12
79.58
293.72
9,012.81
8,921.17
-2,410.38
5,899.37
5,944,985.255
637,223.611
20.34
6,349.32
12,170.70
79.80
292.86
9,017.92
8,926.28
-2,399.27
5,873.54
5,944,995.920
637,197.596
3.06
6,321.35
12,200.46
81.47
290.43
9,022.77
8,931.13
-2,388.44
5,846.25
5,945,006.270
637,170.124
9.82
6,292.08
12,225.56
81.25
288.55
9,026.54
8,934.90
-2,380.16
5,822.86
5,945,014.139
637,146.593
7.46
6,267.28
12,260.48
82.35
285.99
9,031.52
8,939.88
-2,369.90
5,789.85
5,945,023.820
637,113.420
7.91
6,232.72
12,290.39
83.45
284.42
9,035.21
8,943.57
-2,362.12
5,761.21
5,945,031.103
637,084.650
6.38
6,203.06
12,320.49
85.05
282.26
9,038.23
8,946,59
-2,355.21
5,732.08
5,945,037.502
637,055.399
8.90
6,173.19
12,355.83
89.29
281.78
9039.97
8,948.33
-2,347.90
5;697.76
6,945,044.209
637,020.960
12.14
6,138.25
12,380.70
91.75
280.96
9,039:74
8,948.10
-2,342.96
5,673.18
5,945,048.721
636,996.304
10.34
6,113.32
12,415.57
94.98
280.67
9,037.69
8,946.05
-2,336.43
5,638.99
5,945,064.654
636,962.011
9.30
6,078.74
12,440.94
95.26
276.07
9,035.43
8,943.79
-2,332.75
5,614.00
5,945,057.895
636,936.960
18.09
6,053.78
12,472.21
96.34
275.55
9,032.27
8,940.63
-2,329.60
5,583.05
5,945,060.504
636,905.963
3.83
6,023.29
12,501.07
96.83
273.14
9,028.96
8,937.32
-2,327.43
5,554.47
5,945,062.177
636,872347
8.47
5,995.36
12,536.72
96.36
270.21
9,024.86
8,933.22
-2,326.39
5,519.07
5,945,062.594
636,841.942
8.27
5,961.26
12,561.78
94.86
268.60
9,022.41
8,930.77
-2,326.65
5,494.14
5,945,061.900
636,617.015
8.76
5,937.53
12,595.22
93.72
263.66
9,019.91
8,928.27
-2,328.91
5,460.88
5,945,059.070
636,783.803
15.12
5,90644
12,630.67
92.74
262.36
9,017.91
8,926.27
-2,333.21
5,425.75
5,945,054.151
636,748.757
4.59
5,874.18
12,650.70
91.88
258.90
9,017.10
8,925.46
-2,336.47
5,406.00
5,945,050.550
636,729.075
17.79
5,856.30
12,675.31
91.32
256.54
9,016.42
8,924.78
-2,341.70
5,381.97
5,945,044.900
636,705.136
9.85
5,834.91
12,702.42
91.11
255.19
9,015.84
8,924.20
-2,348.32
5,355.69
5,945,037.824
636,678.975
5.04
5,811.79
12,732.10
88.71
256.02
9,015.89
8,924.25
-2,355.70
5,326.94
5,945,029.947
636,650.364
8.56
5,786.54
12,760.76
88.96
262.68
9,016.47
8,924.83
-2,360.99
5,298.79
5,945,024.165
636,622.318
23.25
5,761.24
1/82019 12.45.34PM
Page 21
COMPASS
5000.1 Build 81D
0• •
BP
Final Survey Report
Company:
North America - ALASKA - BP
Local Coordinate Reference:
Well P-04
Project:
PBU
TVD Reference:
KB Q 91.64usft (P -04A)
Site:
P
MD Reference:
KB @ 91.64usft (P -04A)
Well:
P-04
North Reference:
True
Wellbore:
P -04A
Survey Calculation Method:
Minimum Curvature
Design:
P -04A
Database:
EDM RSK- Alaska PROD -ANCP1
Survey
MD
Inc
Azi(azimuth)
TVD
7VDSS
N/S
E/W
Northing
Easting
DLeg
V. Sec
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
(usft)
12,790.78
90.49
268.80
9,016.61
8,924.97
-2,363.22
5,268.87
5,945,021,415
636,592443
21.01
5,733.34
12,822.99
89.72
269.97
9,016.56
8,924.92
-2,363.57
5,236.67
5,945,020.508
636,560.249
4.35
5,702.69
12,842.56
89.02
270.55
9,016.77
8,925.13
-2,363.48
5,217.10
5,945,020.255
636,540.684
4.65
5,683.98
12,871.32
90.64
272.75
9,016.86
8,925.22
-2,362.85
5,188.35
5,945,020.582
636,511.931
9.50
5,656.29
12,905.08
91.87
269.15
9,016.12
8,924.48
-2,362.09
5,154.61
5,945,020.553
636,478.188
11.27
5,623.91
12,935.42
92.86
265.30
9,014.86
8,923.22
-2,363.56
5,124.34
5,945,018.559
636,447.948
13.09
5,595.44
12,965.17
92.15
267.82
9,013.56
8,921.92
-2,365.34
5,094.67
5,945,016.259
636,418.320
8.79
5,567.65
12,990.49
91.26
262.25
9,012.81
8,921.17
-2,367.53
5,069.47
5,945,013.630
636,393.161
22.27
5,544.24
13,022.65
93.87
258.84
9,011.37
8,919.73
-2,372.81
5,037.79
5,945,007.804
636,361.576
13.34
5,515.56
13,049.25
92.27
257.86
9,009.95
8,918.31
-2,378.17
5,011.77
5,945,001.988
636,335.662
7.05
5,492.32
13,085.65
90.52
255.84
9,009.06
8,917.42
-2,386.45
4,976.34
5,944,993.094
636,300.383
7.34
5,460.95
13,109.30
89.17
253.76
9,009.12
8,917.48
-2,392.65
4,953.52
5,944,986.497
636,277.676
10.48
5,441.01
13,140.89
90.65
250.94
9,009.17
8,917.53
-2,402.22
4,923.42
5,944,976.397
636,247.750
10.08
5,415.12
13,172.42
91.63
248.55
9,008.55
8,916.91
-2,413.14
4,893.85
5,944,964.972
636,218.376
8.19
5,390.14
13,201.35
91.44
245.54
9,007.77
8,916.13
-2,424.41
4,867.22
5,944,953.233
636,191.952
10.42
5,368.07
13,232.60
92.15
242.51
9,006.79
8,915.15
-2,438.09
4,839.15
5,944,939.068
636,164.121
9.95
5,345.33
13,261.80
90.15
239.75
9,006.21
8,914.57
-2,452.19
4,813.58
5,944,924.532
636,138.811
11.67
5,325.12
13,296.05
88.83
236.35
9,008.51
8,914.87
-2,470.31
4,784.53
5,944,905.909
636,110.078
10.65
5,302.77
13,322.73
87.79
238.76
9,007.30
8,915.66
-2,484.61
4,762.03
5,944,891.214
636,087.829
9.83
5,285.54
13,352.26
89.91
242.86
9,007.89
8,916.25
-2,499.01
4,736.26
5,944,876.373
636,062.318
15.63
5,265.22
13,385.11
91.81
248.50
9,007.40
8,915.76
-2,512.53
4,706.34
5,944,862.333
636,032.643
18.11
5,240.68
13,408.98
93.66
252.07
9,006.26
8,914.62
-2,520.57
4,683.90
5,944,853.902
636,010.348
16.83
5,221.65
13,440.67
91.32
256.95
9,004.88
8,913.24
-2,529.02
4,653.40
5,944,844.921
635,980.003
17.06
5,195.04
13,470.88
89.82
260.97
9,004.58
8,912.94
-2,534.81
4,623.76
5,944,838.622
635,950.469
14.20
5,168.46
13,504.00
87.48
263.45
9,005.36
8,913.72
-2,539.29
4,590.96
5,944,833.563
635,917.754
10.29
5,138.48
13,529.88
85.73
267.77
9,006.89
8,915.25
-2,541.27
4,565.21
5,944,831.137
635,892.043
17.98
5,114.48
13,561.86
81.78
269.67
9,010.37
8,918.73
-2,541.98
4,533.43
5,944,829.871
635,860.288
13.89
5,084.36
1/8/2019 12.45:34PM Page 22 COMPASS 5000.1 Build 610
A as
Company: North America - ALASKA - BP
Project: PBU
Site. P
Well: P-04
Wellbore: P -04A
Design'. P -04A
Survey
MD Inc Azi (azimuth( TVD
(usft) (°I (I (usft)
13.602 00 81.78 269.67 9,016.11
BP
Final Survey Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well P-04
KB @ 91.64usft (P -04A)
KB Q 91.64usft (P -04A)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
TVDSS N/S E/W Northing EasUng DLeg V. Sec
(usft) (usft) (usft) (usft) (usft) ("MOOusft) (usft)
8,924.47 -2,542.21 4,493.70 5,944,828.950 635,820.575 0.00 5,046.50
1/8/2019 12.45:34PM Page 23 COMPASS 5000.1 Build 81D
EEO
Prow: PBU xpeuwmnIniW�b:WM=7 WELLBORE DETAILS: P -(14A Rs�NFMMTM
P •saaa.nee PMA Do.ae"m°IUElaelaeue'. wdlF4a,nwNut
: PM 9ap�5)�Y'm VaFP(MI ReMew'. It0�91 Wim'AI
Pi1bala: P4N CpNye'm Pa 9p4nryS Relaenw. 9M -(O UN,O WE)
Plan: PMO rasa.e ami Trem MO'. 11515.29_ g°'uue Deem Relxerw
mtmmuamnryaa
uwlefion Wmo1. IAimunGurveve
Easling (200 usMn)
NB @ 91,5<us0 (P -W)
' b
North America - ALASKA - BP
PBU
P
P-04
P -04A
P -04A WP02
AOGCC Offset Well Report
08 January, 2019
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
P
Site Error:
0.00usft
Reference Well:
P-04
Well Error:
0.00usft
Reference Wellbore
P -04A
Reference Design:
P -04A WP02
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well P-04
KB 91.64usft (P -04A)
KB 91.64usft (P -04A)
True
Minimum Curvature
1.00 sigma
EDM R5K-Alaska PROD -ANCP1
Offset Datum
Reference
P -04A WP02
GCT -MS
Filter type:
NO GLOBAL FILTER: Using user defined selection 8 filtering criteria
WARNING: There is hidden tight data in this project
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
Unlimited Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 500.00usft Error Surface:
Elliptical Conic
Survey Program Date 1/8/2019
From To
(usft) (usft) Survey(Wellbore)
50.30 11,51529 P-04 Srvy 1 GCT -MS (P-04)
11,517.00 13,602.00 Survey#1 (P -04A)
Tool Name
i
i
Description
GCT -MS
Schlumberger GCT multishot
MWD
MWD- Standard
1/812019 1:02, 43PM Page 2 014 COMPASS 5000.1 Build 81D
BP
bp Anticollisian Report
Company:
North America -ALASKA - BP
Local Coordinate Reference:
Well P-04
Project:
PBU
TVD Reference:
KB @ 91.64usft (P -04A)
Reference Site:
P
MD Reference:
KB @ 91.64usft (P -04A)
Site Error:
0 oousft
North Reference:
True
Reference Well
P-04
Survey Calculation Method:
Minimum Curvature
Well Error:
0.00usft
Output errors are at
1.00 sigma
Reference Wellbore
P -04A
Database:
EDM RSK- Alaska PROD -ANCP1
Reference Design:
P -04A WP02
Offset TVD Reference:
Offset Datum
Summary
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
P
P-01 - P-01 - P-01
855.89
850.00
104.33
P-01 - P -01A - P -01A
855.89
850.00
104.33
P-01 - P-01APB1 - P-O1APB1
855.89
850.00
104.33
P-01 - P-01APB2 - P-01APB2
855.89
850.00
104.33
P-01 - P-01APB3 - P-01APB3
855.89
850.00
104.33
P-02 - P-02 - P-02
753.56
750.00
60.44
P-02 - P -02A - P -02A
753.56
750.00
60.44
P-02 - P-02APB1 - P-02APB1
753.56
750.00
60.44
P -03 -P -03-P-03
1,900.03
1,900.00
27.44
P-03 - P -03A - P -03A
1,900.03
1,900.00
2744
P-03 - P-03AP81 - P-03APBI
1,900.03
1,900.00
27,44
P-03 - P-03APB2 - P-03APB2
1,900.03
1,900.00
27.44
P-04 - P -04A - P -04A WP02
13,647.58
13,647.58
0.00
P -05 -P -05-P-05
1,277.57
1,275.00
33.69
P-05 - P -05A - P -05A
1,277.57
1,275.00
33.69
P-05 - P-05PB1 - P-05PB1
1,277.57
1,275.00
33.69
P -06 -P -06-P-06
1,798.22
1,800.00
71.89
P-06 - P -06A - P -06A
1,798.22
1,800.00
71.89
P-06 - P -06B - P -06B
1,798.22
1,800.00
71.89
P-07 - P-07 - P-07
803.49
800.00
103.36
P-07 - P -07A - P -07A
80149
800.00
103.36
P -08 -P -08-P-08
1,244.72
1,250.00
93.96
P-08 - P -08A - P -08A
1,244.72
1,250.00
93.96
P-08 - P-08APB1 - P-08APB1
1,244.72
1,250.00
93.96
P-09 - P-09 - P-09
951.16
950.00
178.76
P-09 - P-091_1 - P-091_1
951.16
950.00
178.76
P -10 -P -10-P-10
1,943.17
1,950.00
216.11
P-10 - P-1 GA - P -10A
1,943.17
1,950.00
216.11
P-11 - P-11 - P-11
2,605.90
2,575.00
49.64
P-11 - P-111_1 - P-111_1
2,605.90
2,575.00
49.64
P-11 - P-11UPB1 - P-11L1PB1
2,605.90
2,575.00
49.64
P-11-P-11L1PB2-P-11UPB2
2,605.90
2,575.00
49.64
P-12 - P-12 - P-12
2,578.19
2,550.00
16.94
P-12 - P -12A- P -12A
2,583.22
2,550.00
16.74
P-12-P-12APBI-P-12APB1
2,583.22
2,550.00
16.74
P-12 - P-12APB2 - P-12APB2
2,583.22
2,550.00
16.74
P-12 - P -12B - P -12B
2,583.22
2,550.00
16.74
P-12 - P-12BL1 - P-12BL1
2,583.22
2,550.00
16.74
P-13 - P-13 - P-13
2,548.80
2,525.00
14.29
P-14 - P-14 - P-14
2,547.50
2,525.00
52.89
P-15 - P-15 - P-15
2,495.66
2,475.00
78.58
P-15 - P -1 5L1 - P-151-1
2,495.66
2,475.00
78.58
P-16 - P-16 - P-16
2,493.94
2,475.00
120.53
P-16 - P -16A - P -16A
2,492.10
2,475.00
120.51
P-16 - P-16APB1 - P-16APB1
2,492.10
2,475.00
120.51
P-17 - P-17 - P-17
2,469.79
2,475.00
152.79
P-17 - P-171.1 - P-171.1
2,489.79
2,475.00
152.79
P-18 - P-18 - P-18
2,466.04
2,450.00
177.91
P -18 -P -181.1-P-1 BLI
2,466.04
2,450.00
177.91
P-19 - P-19 - P-19
2,464.10
2,450.00
222.33
P-19 - P-191-1 - P-1911
2,464.10
2,450.00
222.33
P-19 - P-19LIPBI - P-191_1 PBI
2,464.10
2,450.00
222.33
P-20 - P-20 - P-20
2,458.36
2,450.00
246.89
1/!2019 1:02,43PM Page 3 of 4 COMPASS 5000.1 Build 81D
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
P
Site Error:
0.00usft
Reference Well:
P-04
Well Error:
0.00usft
Reference Wellbore
P -04A
Reference Design:
P -04A WP02
Summary
Site Name
Offset Well - Wellbore - Design
P
P-20 - P -20A - P -20A
P-20 - P-20APB1 - P-20APB1
P-20 - P -20B - P -20B
P-22 - P-22 - P-22
P-23 - P-23 - P-23
P-23 - Plan P -23A- Plan #2 P -23A
P-24 - P-24 - P-24
P-24 - P-24PB1 - P-24PB1
P-25 - P-25 - P-25
P-25 - P-2511 - P-2511
P-26 - P-26 - P-26
P-27 - P-27 - P-27
--28 - P-28 - P-28
1-30 - P-30 - P-30
'-30 - P-30PB1 - P-30PB1
rest Site
--04 COPY FOR TESTING - P-04 - P-04
'-04 COPY FOR TESTING - P -04A- P -04A
--04 COPY FOR TESTING - P -04A- P -04A WP02
'-04 COPY FOR TESTING - P-041-1 - P-04LI
BP
Anticollision Report
Local Coordinate Reference:
Well P-04
TVD Reference:
KB @ 91.64usft (P -04A)
MD Reference:
KB @ 91.64usft (P -04A)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Output errors are at
1.00 sigma
Database:
EDM R5K - Alaska PROD - ANCP1
Offset TVD Reference:
Offset Datum
Reference
Offset Centre to
Measured
Measured Centre
Depth
Depth Distance
(usft)
(usft) (usft)
2,442.91
2,425.00 246.41
2,442.91
2,425.00 246.41
2,444.80
2,425.00 246.46
2,635.60
2,600.00 82.42
479.37
475.00 142.12
471.79
475.00 141.98
775.05
775.00 242.93
775.05
775.00 242.93
2,344.65
2,325.00 388.96
2,344.65
2,325.00 388.96
3,151.82
3,050.00 204.31
136.41
125.00 88.56
434.89
425.00 176.21
491.22
500.00 158.93
491.22
500.00 158.93
11,525.00
11,525.00 0.02
37.84
37.84 0.00
5,900.00
5,900.00 0.00
11,525.00
11,525.00 0.02
1/2019 1:02:43PM Page 4 of COMPASS 5000.1 Build 81D
Printed 2011019 11:01:31AM
North America - ALASKA - BP
Page t of 2
Cementing Report
Common Well Name: P-04 / 02
- -- -- - -- - —
Project: PBU
_-
no.: 1 Report date: 1/4/2019
Sde:
P
-
ud Oolemma: 8/11/1891
Event Type: COM- ONSHORE (CON)
- - _
Start Date: 1/42019 Ertl Gate
fReport
FE No.:
Contractor. NABORS ALASKA DRILLING INC. Rip NamelNo.: CDR -2 Rig Release:
-0197J-C: (979,713.00)
BPUOI: USA00001646
Active datum: KB @91.64us8 (above Mean Sea Leve0
General Information
Job type. Primary
Cement job start date/time: 1/8/2019 2:OOPM
Job end dateltime. 1/8/2019 6:00PM
Cement Company SCHLUMBERGER
Cementer. KEITH PIERCE
Cemented Strang. PRODUCTION LINER 1
String Size: 2.875 (in)
String Set TMD: 13,602.00 (usR) Hole Size: 4.250 (in)
Pipe Movement
Pipe Movement: NO MOVEMENT
Retailing Time (Start -End):
RPM:
Rotating Torque (mit/avg/max): (ft-lbo
Reciprocating Time (Start -End):
Recip Drag Up/Doom - (kip)
SPM: Stroke Length.
Fluid Name: CEMENT
Fluids (1 of 1)
Slurry Type: CEMENT
Purpose: PRIMARY
Class:
G -CLASS Description:
LEAD SLURRY Density: 15.30 (ppg)
Yield: 1.6500 (R/ak)
Mix Water Ratio:
5.162 (galisk94) Excess:
Mix Method: BATCH
Socks Used: 90.50 (941b sacks)
Water Volume:
11.1 (bbl) Excess Slurry Volume:
0.0 (bbl) Density Measured by: DENSOMETER
Other Volume:
Total Vol in Well:
Slurry Volume:
26.6 (bbl) Excess Measured From: EST. GAUGE HOLE
Mud Type.
Density:
PV:
YP: Viscosity:
Gels 10 Sec:
Gels 10 Min:
Additives
Name
Type
Amount Units
Concentration Unit
D047
ANTIFOAMAGENT
0.100
GAUSX
D206
ANTIFOAMAGENT
0.100
GAusx
D065
WEIGHTINGAGENT
1.250
%BWOC
D167
FLUID LOSS
0.150
%BWOC
D600 G
GAS -BLOCK
1.800
GAUSX
D178
SILICA
35.000
% BWOC
D800
RETARDER AID
0.800
% BWOC
Fluid Tab
Thick time
Thick
Free water
Free water
Fluid loss
Fluid loss
Fluid loss
Comp
Comp
Comp
Comp
Comp Strength
Comp Strength
temp.
(cc/30min)
temp.
press.
Strength
Strength
Strength
Strength Time
Pressure 2
Temperature 2
(°F)
(°F)
(°F)
(Psi)
Time 1
Pressure 1
Temperature 1
2
(psi)
(°F)
min(psi)
°F
min
4 43
0.00
80.00
21.0
180.00
Printed 2011019 11:01:31AM
Printed 2/7/2019 11:01:31AM
North America - ALASKA - BP
Page 2 of 2
Cementing Report
Common Well Name: P-04 / 02
Report no.: 1 Report date: 1/4/2019
Project: PBU
Site: P -
Spud Date/Tim : 6/11/1981
Event Type: COM- ONSHORE (CON)
Start Date. 1/4/2019 End Date: 1/10/2019
Rig Name/No.: CDR -2 Rig Release:
AFE No.:
X30197J-C: (979,713.D0 )
Contractor. NABORS ALASKA DRILLING INC.
BPUOI: USA00001848
Active datum : KB 691.e4usft (above Mean Sea level)
aasva
Stage
Stage Type
Est. Top
Est. Bottom
Mud Circ.
Mud Circ. Tap
Bottom
Plug
Pressure
Float
Pressure
Returns
Circulate
Cmt Vol to
Total
Annular
no.
(usft)
(usft)
Rate
Press. Plug
Plug
Bumpetl
Bumped
Held
Held
Prior
Surface
Mud Lost
Flow
(gpm)
(psi)
(psi)
(min)
(hr)
(bbl)
(bbl)
Atter
pumpiae schedule
Fluid pumped Volume
Avg.
Max Disp.
Slurry Top
Slurry Base Start Mix Cmt
Start Slurry
Pumping end
Start Disp Foam
Gas Type
Gas Vol
BH circ.
Pumped
Disp.
Rete
TMD
TMD
Pmp
date/time
job
Used
temp.
1131hatimic
temp.
(bbl)
Rate
(bbl/min)
(usft)
(usft)
(act)
bbUmin
Tach
Casing Test
Shoe Teat
Liner Top Test
Test Pressure: (psi)
FIT/LOT:
(ppg) Liner Overlap:
(usft)
Time: (min)
Tool:
N Positive Test.
(ppg)
Positive Test Tool:
N
Cement Found between Shoe and Collar:
N
Open Hole Length: (usft) Negative Test:
(ppg)
Negative Test Tool:
N
Hours Before Start: (hr) Time before test:
(hr)
Cmt Found on Tool:
N
Log/Survey Evaluation
Interpretation Summary
CBLRun: N
Cement Top:
(usft)
Under Pressure: (psi)
How Determined:
Bond Quality:
TOC Sufficient :
N
CET Run: N
Job Rating:
Bond Quality:
If Unsuccessful, Detection Indicator:
Temp Survey: N
Remedial Cement Required:
N
Him Prior to Log: (hr)
How Determined:
Printed 2/7/2019 11:01:31AM
BA_ KER 0 PRINT DISTRIBUTION LIST
HUGHES
a GE company
COMPANY BP Exploration Alaska Inc.
WELL NAME P -04A
FIELD Prudhoe Bay Unit
COUNTY PRUDHOE BAY
BHI DISTRICT Alaska
AUTHORIZED BY Patrick Rider
EMAIL Patrick.Rider(fthge.com
STATUS
COMPANY
Final Replacement:
ADDRESS (FEDEX WILL NOT DELWER TO P.O. BOX)
PERSON ATTENTION
V
RP North Slope.
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aides
Attn: Benda Glassmaker & Peggy O'Neil
900 E. Benson Blvd.
Anchorage. Alaska 99508
2 ConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99501
3 Exxon Mobil, Alaska
Attn: Lynda M. Yaskell and/or Leonardo F.lias
3201 C Street, Suite 505
Anchorage, AK 99503
4 l State of Alaska -AOGCC
Attn: Natural Resources Technician II
333 W. 711 Ave, Suite 100
Anchorage, Alaska 99501
218116
3x239
tse sign and return one copy of this transmittal form to:
Exploration (Alaska)Inc.
rotechnical Data Center, 1-112-1
) E. Benson Blvd.
:horage, Alaska 99508 or AKGDMINTERNAL@bp.com
LOG TYPE GR - RES
LOG DATE January 3, 2019
TODAYS DATE January 11, 2019
Revision
No Details:
Rev. Requested by: ---
FIELD /
FINAL
CD/DVD
FINAL
PRELIM
I
(las, dlis, PDF, META,
SURVEY
REPORT
LOGS
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTS
# OF COPIES
1#01- COPIES
14 OF COPIES
J 4 4 lu 4 4
5 DNR - Division ofOil & Gas ...
Attn: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
**` Stamp "confidential" on all material deliver to or
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, IR2-1
'.900 E. Benson Blvd.
(Anchorage, Alaska 99508
Attn: Nancy Landi
TOTALS FOR THIS PAGE: 0 2 4 2 0
THE STATE
°fALASKA
GOVERNOR BILL WALKER
John Egbejimba
Engineering Team Leader — CTD & RWO
BP Exploration (Alaska), Inc.
P.O Box 196612
Anchorage, AK 99519-6612
Alaska Oil and Gas
Conservation Commission
Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU P -04A
BP Exploration (Alaska), Inc.
Permit to Drill Number: 218-116
Surface Location: 2564' FSL, 2001' FWL, SEC. 31, TI IN, RI 3E, UM
Bottomhole Location: 22' FSL, 1473' FWL, SEC. 32, TI IN, RI 3E, UM
Dear Mr. Egbejimba:
333 West 7Th Avenue
Anchorage, Alaska 99501
Main: 907.297.1433
Fax: 907.276.7542
www,aogcc.olaska.gov
Enclosed is the approved application for the permit to redrill the above referenced development
well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
4�
DATED this lD day of October, 2018.
Sincerely,
Hollis S. French
Chair
RBDMS_ OCT 1 12018
STATE OF ALASKA
ASKA OIL AND GAS CONSERVATION COMMISSI
PERMIT TO DRILL
20 AAC 25.005
Ia. Type of Work:
ib. Proposed Well Class: Exploratory - Gas ❑ Service -WAG ❑ Service - Disp❑
1c. Specify if well is proposed for.
Drill ❑ Lateral ❑
Stratigraphic Test ❑ Development -Oil 0 •Service -Winj ❑ Single Zone 0
Coalbed Gas ❑ Gas Hytlretes❑
Redrill 0 * Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond Blanket 0• Single Well ❑
11. Well Name and Number:
BP Exploration (Alaska), Inc
Bond No. 295105380 •
PBU P -04A '
3 Address:
6, Proposed Depth:
12. Field/Pool(s):
P.O. Box 196612 Anchorage. AK 99519.6612
MD: 13648' TVD: 8910'ss '
PRUDHOE BAY, PRUDHOE
OIL
4a. Location of Well Governmental Section).
( )
7. Property Designation (Lease Number):
ADL 028288
8. DNR Approval Number:
13. Approximate spud date:
Surface: 2564' FSL, 2001' FWL, Sec.31, T11N, R13E, UM
435' FSL, 3089' FWL, Sec. 32, T11N, R13E, UM
88-016
December 1, 2016 4
Top of Productive Horizon:
9. Acres in Property: 2491
14. Distance to Nearest Property:
Total Depth: 22' FSL, 1473' FWL, Sec, 32, T11N, R13E, UM
10450
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL: 91.64 feet
15. Distance to Nearest Well Open
to Same Pool:
Surface: x- 631284 y- 5947292 Zone - ASP 4
GL Elevation above MSL: 54.19 feet
80
16. Deviated wells: Kickoff Depth: 11520 feet
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 100 degrees
Downhole: 3287 - Surface: 2389
18, Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casino Weioht Grade Couolmo L n th
MD TVD MD TVD(including stage data
4-1/2" 3-1/4"x2-7/8" 6.6#/6.5# 13Cr80 STL / TCII 2388'
11260' 8629'ss 13648' 8910'ss 147 sx Class'G'
19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft):
Plugs (measured):
Effect. Depth MD (ft):
Effect. Depth TVD (ft):
Junk (measured):
12010 9265
None
11549
8926
None
Casing Length Size Cement Volume MD TVD
Conductor/Structural 80 20' 42-122 42-122
Surface 2693 10-3/4" 2622 cu It Permafrost 41-2734 41-2691
Intermediate 11503 7-5/8" 1742 cu ft Class'G' 38-11541 38-8920
Production
Liner 721 5-1/2" 170 cu it Class'G' 11284 - 12005 8738-9262
Perforation Depth MD (ft): 11509 -11768 Perforation Depth TVD (ft): 8898-9087
Hydraulic Fracture planned? Yes ❑ No 0
20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Leemhuis. Jacob
from without prior written approval.
Contact Email Jacob.LeemhuisDbp.cem
Authorized Name Egbeiimba, John
Authorized Title En ineering Team Leader - CTD 6 RWO Contact Phone +1 907 564 4989
Authorized Signature Date 1 t2. C> 1 g"
Commission Use Only
Permit Drill
Approve
cover for other
Number: /��'��
API: 50- 029-22180-01-00
Di Qit
yquirementster
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbedmet ne, gas hydrees, or gas contained in shales:
IS
Other: ��P / fS f �-p 35pp 5-t-cr Samples req'd: Yes ❑/ No Mud log req'd: Yes ❑ No
JJ
Q��V�G 2- tVy r H2S measures Yes IN No ❑/ Directional svy req'd: Yes IR/ No ❑
Spacing exception req'd: Yes ❑ No Q Inclination -only svy req'd: Yes ❑ No iD"/
Post initial injection MIT req'd: Yes ❑ No
APPROVED BY
Approved by: in 8 THE COMMISSION Date: I r o I IQ
'-T/ /&/-3/10 URI V I IN H L
Form 10-401 Revised 5/2017 This permit is valid for 24 months from the tl val (20 AAC 25.005(g)) Submit Forth and
RUL) OCT 1 1 2018.,o ���aMm Daplicate�_i�
To: Alaska Oil & Gas Conservation Commission ,'♦,5V
From: Jacob Leemhuis
bP
CTD Engineer 19L
Date: September 19, 2018
Re: P -OA Permit to Drill Request
Approval is requested for a permit to drill a CTD sidetrack lateral from well P -04A with the Nabors CDR2
Coiled Tubing Drilling rig on or around December 1", 2018.
Proposed plan for P -04A: The sidetrack P -04A will be a 2128' horizontal CST. The P -04A sidetrack will be drilled on or
around December 1", 2018. The rig will move in, test BOPE and kill the well. The 3.80" dual string window will be milled off
a 4-1/2" x 5-1/2" delta whipstock set pre -rig. The well kicks -off in the Shublik and lands in Zone 4. The proposed sidetrack
will be completed with a 3-1/4" x 2-7/8" 13Cr solid liner, cemented in place and selectively perforated.
Rig
Work (scheduled to begin December 1"' 2018)
1.
MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2389 psi).
2.
Mill 3.80"Window+10'ofrathole.
3.
Drill production build section: 4.25" OH, '"470' (35 deg DLS planned).
4.
Drill production lateral: 4.25" OH, '"1628' (12 deg DIS planned).
5.
Pump primary cement job: 30.3 bbls, 15.3 ppg Class G, TOC at TOL (11,260 MD).*
6.
Perforate —900' based on drilling logs.
7.
Freeze protect well to a min 2500' TVDss.
8.
Close in tree, RDMO.
* Approved alternate plug placement per 20 AAC 25.112(i)
Post -Rig Work:
1. V: Pull TWC if set. Tree Work as necessary
2. S: Drift to deviation. Set Live GLVs. Set LTP if required
3. T: New well flowback up to 7 days
Mud Program:
• Drilling/Completion: a min EMW of 8.6 ppg KCL with Geovis for drilling (723 psi over -balance).
Disposal:
• All Class 1& II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6.
• Fluids >1% hydrocarbons or flammables must go to Pad 3.
• Fluids >15% solids by volume must go to GNI.
• Fluids with solids that will not pass through 1/4" screen must go to GNI.
• Fluids with PH >ll must go to GNI.
Hole Size:
• 4.25" for entirety of the production hole section.
Liner Program:
• 2-7/8", 6.5#, 13Cr solid liner: 12,030' MD —13,648' MD
• 3-1/4", 6.6#, 13Crsolid liner: 11,260' MD -12,030' MD
• A planned 30.3 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at 11,260' MD).
• The primary barrier for this operation: a minimum EMW of 8.6 ppg (723 psi over -balance).
• A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi.
• The annular preventer will be tested to 250 psi and 3500 psi.
Directional:
• See attached directional plan. Maximum planned hole angle is 100% inclination at kick off point is 45°.
• Magnetic and inclination surveys will betaken every 30 ft. No gyro will be run.
• Distance to nearest property — 10,450'
• Distance to nearest well within pool — 800'
Logging:
• MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section.
Perforating:
• Perforating: —900' of perforations, 2", 60 deg random phasing, 6 spf, perf guns.
• The primary barrier for this operation: a minimum EMW of 8.6 ppg (723 psi over -balance).
• A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Anti -Collision Failures:
• None. All offset wells pass BP anti -collision scan criteria.
Hazards:
• P -pad is considered an H2S pad. Recent 1-12S reading on P-04 is 44 (1/6/2016). Max recorded on the pad/facility:
350 ppm on Y-33 (2/23/2011). ,
• Lost circulation risk on P -04A is considered Medium.
Reservoir Pressure:
• The reservoir pressure on P -04A is expected to be 3287 psi at 8980' TVDSS (7.05 ppg equivalent).
• Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2389 psi.
• A min EMW of 8.6 ppg for this well will provide 723 psi over -balance to the reservoir.
Jacob Leemhuis CC: Well File
CTD Engineer Joseph Lastufka
564-4989
North America - ALASKA - BP
PBU
P
P-04
PLAN P -04A
Plan: P -04A WP02
BP Coil Tubing Report
12 September, 2018
BA ERIGI0
BAT
GF company
Company:
North America - ALASKA - BP
Project:
PBU
Site:
P
Well:
P-04
Wellbore:
PLAN P -04A
Design:
P -04A WP02
BP
P, TR -11-13 — --- --�
Site Position:
623,154.060 usft
From:
BA
ER
BP Coil Tubing Report
Well
P-04, P-04
y HES
Ty
+N/ -S 0.00 usft
GEro»nTm
Position Uncertainty
Local Co-ordinate Reference:
Well P-04
PLAN P -04A
TVD Reference:
Mean Sea Level
MD Reference:
KB @ 91.64usft (P-04)
P -04A VVP02 -
North Reference:
True -
Version:
Survey Calculation Method:
Minimum Curvature ,
Depth From (TVD[
Database:
EDM R5K - Alaska PROD - ANCP1
Project PBU, PBU, PRUDHOE
Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level
Geo Datum: NAD27. OGP-Um AK [4267.15864] Using Well Reference Point
Map Zone: NAD27'OGP-Usa AK/Alaska zone 4[26734.158& Using geodetic scale factor
Site
P, TR -11-13 — --- --�
Site Position:
623,154.060 usft
From:
Map
Position Uncertainty:
0.00 usft
Well
P-04, P-04
Well Position
+N/ -S 0.00 usft
+EI -W 0,00 usft
Position Uncertainty
0.00 usft
Wellbore
PLAN P -04A
Magnetics
Model Name Sample Date
BGGM2018 12/1/2018
Design
P -04A VVP02 -
Audit Notes:
Version:
Phase:
Vertical Section:
Depth From (TVD[
(usft)
53 80
Northing:
5,949,377.170 usft
Easting:
623,154.060 usft
Slot Radius:
0.000 in
Northing:
5,947,292220 usft i
Easting:
631,283.590 usft
Wellhead Elevation:
53.80 usft
Latitude:
Longitude:
Gdtl Convergence:
Latitude:
Longitude:
Ground Level:
Declination Dip Angle Field Strength
1°I 1°I (nT)
17.02 80.90 57,437
PLAN Tie On Depth: 11 48749
*NI -S +EI -W Direction
(usft) (usft) (°)
0.00 000 230.00
70'16'12.612N
149'0'14.402 W
0.94
70° 15'50157 N '
148° 56' 18.821 W
54.19 usft
9/12/2018 4:32:28PM Page 2 COMPASS 5000.1 Build 81D
BP
BP Coil Tubing Report
BAKER
JUGHES
Company: North America - ALASKA - BP
Local Co-ordinate Reference:
Well P-04
Project: PBU
TVD Reference:
Mean Sea Level
Site: P
MD Reference:
KB @ 91.64usft (P-04)
Well: P-04
North Reference:
True
Wellbore: PLAN P -04A
Survey Calculation Method:
Minimum Curvature
Design: P -04A WP02
Database:
EDM RSK- Alaska PROD -ANCP1
Survey Tool Program Date 9/12/2018
From To
(usft) (usft) Survey (Wellbore)
Tool Name
Description
50.30 11,48749 P-04 Srvy 1 GCT -MS (P -D4)
GCT -MS
Schlumberger GCT multishot
11,487.49 13,647.58 P -04A WP02(PLAN P.04A)
MWD
MWD -Standard
Planned Survey
MD Inc Azi
TVDSS
NIS
EIW
Northing
Easting
DLeg
V. Sec
(usft) (°) V)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
11,487.49 44.98
12471
8,790.66
-2,060.11
6,001.37
5,945,337.225
637,319.487
0.00
-3,273.10
P-04 Actual Survey
11,500.00 45.07
124.51
8,799.50
-2,065.14
6,008.68
5,945,332.326
637,326.857
1.31
-3,275.45
11,507.79 45.12
124.39
8,805.00
-2,068.26
6,013.20
5,945,329.287
637,331.458
1.31
-3,276.93
TSGR
11,515.29 45.17
124.27
8,810.29
-2,071.26
6,017.60
5,945,326.364
637,335.901
1.31
-3,278.37
P-04 Actual Survey - TIP
11,520.00 45.14
124.20
8,813.61
-2,073.14
6,020.36
5,945,324.534
637,338.694
1.23
-3,279.27
KOP - 5117' x 7 618" Dual String Exit - TOWS
-2,073.35
-3,279.38
11,536.35 46.61
124.20
8,825.00
-2,079.74
6,030.07
5,945,318.106
637,348.517
9.00
-3,282.47
TSHU
11,540.00 46.94
124.20
8,827.50
-2,081.23
6,032.26
5,945,316.652
637,350.739
9.00
-3,283.19
Start Build 35.00
11570.00 57.44
124.20
8,845.86
-2,094.53
6,051.84
5,945,303.693
637,370.542
35.00
-3,289.64
Start OLS 35.00 TFO 10.00
11,600.00 67.80
126.16
8,859.64
-2,109.87
6,073.57
5,945,268.732
637,392.535
35.00
-3,296.42
11,649.73 85.00
128.88
8,871.29
-2,139.23
6,111.73
5,945,260.049
637,431.199
35.00
-3,306.79
Start Tum 35.13
11,700.00 85.00
146.54
8,875.68
-2,176.13
6,145.30
5,945,223.742
637,465.401
3500
-3,308.78
11,800.00 65.00
181.67
8,884.39
-2,270.45
6,172.15
5,945,129.915
637,493.897
34.99
-3,268.73
11,900.00 85.00
216.80
8,893.11
.2,363.04
6,139.85
5,945,036.782
637,463.211
34.99
-3,184.46
TFace
1°I
0.00
-58.78
-58.64
-58.55
-121.18
0.00
0.00
0.00
10.00
9.10
90.78
91.58
91.58
91122018 4:32:28PM Page 3 COMPASS 5000.1 Build 81D
Company: North America - ALASKA - BP
Project: PBU
Site: P
Well: P-04
Wellbore: PLAN P -04A
Design: P -04A WP02
Planned Survey
Tubing Report
MD Inc
(usft) (1
11,979.08
85.00
TEIL
12,000.00
85.00
12,01973
85.00
Start DLS 12.00 TFO 140.00
12,034.46
83.65
TSAD
12,049.70
82.25
Start DLS 12.00 TFO 90.00
12,100.00
82.29
12,200.00
82.63
12,201.52
82.64
45N
TVD Reference:
12,217.22
82.72
45P
12,300.00
83.30
12,319.70
83.46
Start DLS 12.00 TFO 30.00
12,381.15
89.86
Invert #1
12,382.52
90.00
Start DLS 12.00 TFO -40.00
12,400.00
91.61
12,491.70
100.00
Start Tum -12.19
12,500.00
100.00
12,557.50
100.00
45P
Minimum Curvature
9/1212018 4: 32:28PM Page 4 COMPASS 5000.1 Build 81D
BP
BVER
BP Coil
Tubing Report
UGHES
cero,nPnw
Local Co-ordinate
Reference:
Well P-04
TVD Reference:
Mean Sea Level
MD Reference:
KB @ 91.64usft (P-04)
North Reference:
True
Survey Calculation
Method:
Minimum Curvature
Database:
EDM R5K - Alaska PROD - ANCP1
Azi
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
TFace
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
Waft)
(°)
244.58
8,900.00
-2,412.46
607949
5,944,986.320
637,403.727
34.99
-3,10646
91.23
251.93
8,901.82
-2,420.18
6,060.14
5,944,978.270
637,384.523
35.00
-3,08668
90.34
258.86
8,903.54
.2,425.13
6,041.14
5,944,972.987
637,365.608
35.00
-3,068.94
90.30
260.00
8,905.00
-2,427.82
6,026.73
5,944,970.048
637,351.246
12.00
-3,056.17
140.00
261.19
6,906.87
-2,430.29
6,011.81
5,944,967.318
637,336.377
12.00
-3,043.16
139.89
267.28
8,913.64
-2,435.29
5,962.24
5,944,961.453
637,286.905
12.00
-3,001.97
90.00
279.38
8,926.81
-2,429.53
5,863.46
5,944,985.488
637,188.049
12.00
-2,930.00
89.18
279.57
8,927.00
.2,429.28
5,861.98
5,944,965.710
637,186.563
12.00
-2,929.02
87.59
281.47
8,929.00
-2,426.44
5,846.67
5,944,968.285
637,171.206
12.00
-2,919.12
87.56
291.46
8,939.10
-2,403.18
5,767.97
5,944,990.164
637,092.123
12.00
-2,873.79
87.32
293.83
8,941.37
-2,395.65
5,749.92
5,944,997379
637,073.941
12.00
-2,864.80
86.10
297.51
8,944.95
-2,369.09
5,694.66
5,945,022.974
637,018.236
12.00
-2,839.55
30.00
297.59
8,944.95
-2,368.46
5,693.45
5,945,023.584
637,017.016
12.00
-2,839.02
29.79
296.24
8,944.71
-2,360.54
5,677.87
5,945,031.224
637,001.293
12.00
-2,832.17
-40.00
289.08
8,93543
-2,325.41
5,593.83
5,945,064.886
636,916.665
12.00
-2,790.38
-00.02
288.07
8,933.99
-2,322.80
5,586.08
5,945,067.355
636,908.870
1200.
-2,786.12
-89.91
281.06
8,924.00
-2,308.57
5,531.31
5,945,080.630
636,853.863
12.00
-2,753.31
-89.37
9/1212018 4: 32:28PM Page 4 COMPASS 5000.1 Build 81D
Company:
North America - ALASKA - BP
Project:
PBU
Site:
P
Well:
P-04
Wellbore:
PLAN P -04A
Design:
P -04A WP02
Planned Survey
TVDSS
MD Inc
ENV
(usft) 1°1
Easting
12,569.00
100.00
45N
(°)
12,571.70
100.00
Start DLS 12.00 TFO .130.00
12,600.00
97.81
12,66940
92.37
Revert #1
279.66
12,699.53
90.00
Start DLS 12.00 TFO .140.00
12,700.00
89.96
12,748.52
85.50
Start Turn -12.04
279.33
12,800.00
85.50
12,846.75
85.50
45N
12.00
12,872.20
85.50
45P
8,917.16
12,900.00
85.50
12,948.52
85.50
Start Turn 12.04
-2,725.66
13,000.00
85.50
13,100.00
85.50
13,148.52
85.50
Start DLS 12.00 TFO 40.00
1200.
13,170.00
87.48
Invert#2
8,910.37
13,197.40
90.00
Start DLS 12.00 TFO -60.00
13,200A0
90.16
BP
BP Coil Tubing Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
BAKER ,
UGHES
Well P-04
Mean Sea Level
KB @ 91.64usft (P-04)
True
Minimum Curvature
EDM RSK - Alaska PROD - ANCP1
Azi
TVDSS
NIS
ENV
Northing
Easting
DLeg
V. Sec
TFace
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(usft)
(°)
279.66
8,922.01
-2,306.53
5,520.17
5,945,082472
636,842.689
12.00
-2,746.08
-89.93
279.33
8,921.54
-2,306.09
5,517.55
5,945,082.864
636,840.063
12.00
-2,744.36
-90.17
276.71
8,917.16
-2,302.20
5,489.86
5,945,086.278
636,812.316
12.00
-2,725.66
-130.00
270.37
8,911.00
-2,297.95
5,420.93
5,945,089.320
636,743.324
1200.
-2,675.58
-130.41
267.64
8,910.37
-2,298.48
5,390.82
5,945,088.271
636,713.228
12.00
-2,652.17
-130.97
267.60
8,910.37
.2,298.50
5,390.34
5,945,088.243
636,712.757
1200
-2,651.80
-140.00
263.85
8,912.30
-2,302.10
5,34202
5,945,083.794
636,664.508
12.00
-2,612.46
-140.00
257.65
8,916.34
.2,310.35
5,291.39
5,945,074.670
636,614.031
12.00
-2,568.38
-90.24
252.03
8,920.00
.2,322.53
5,246.42
5,945,061.705
636,569.288
12.00
-2,526.10
-90.23
248.96
8,922.00
-2,331.00
5,222.51
5,945,052.819
636,545.529
12.00
-2,502.34
-90.12
245.61
8,924.18
-2,341.70
5,196.95
5,945,041.677
636,520.160
12.00
-2,475.88
-90.12
239.77
8,927.99
-2,363.88
5,153.99
5,945,018.754
636,477.598
12.00
-2,428.71
-90.23
245.97
8,932.03
-2,387.27
5,108.33
5,944,994.571
636,432.360
1200.
-2,378.70
90.24
258.01
8,939.87
-2,418.03
5,013.70
5,944,962.164
636,338.285
12.00
-2,286.43
90.47
263.85
8,943.68
-2,425.65
4,965.96
5,944,953.714
636,290.687
12.00
-2,244.96
90.23
265.51
8,945.00
-2,427.64
4,944.61
5,944,951.355
636,269.378
12.00
-2,227.33
40.00
267.62
8,945.60
-2,429.28
4,917.27
5,944,949.238
636,242.074
12.00
-2,205.34
39.90
267.35
8,945.60
-2,429.40
4,914.67
5,944,949.078
636,239.478
12.00
-2,203.27
-60.00
9/12/2016 4:32'28PM Page 5 COMPASS 5000.1 Build 81D
Company: North America - ALASKA - BP
NIS
Project: PBU
Northing
Easting
Site: P
V. Sec
TFace
Well: P-04
(usft(
(usft)
Wellbore: PLAN P -04A
(usft)
(°/t00usft)
Design: P -04A WP02
(°(
8,941.94
Planned Survey
4,834.38
5,944,938013
MD Inc
Azi
-2,135.55
(usft)
8,940.29
-2,443.07
13,281.05
95.00
258.90
Start Turn -12.05
-2,118.85
-89.90
13,300.00
95.00
256.62
13,400.00
95.00
244.57
13,421.05
95.00
242.03
Start Turn 12.05
4,703.41
5,944,889.280
13,500.00
95.00
251.55
13,600.00
95.00
263.60
13,647.58
95.00
269.33
TD at 13647.58
-1,930.15
89.58
BP
BP Coil Tubing Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
BAKER 10
gUGHES
cE,n.,v
Well P-04
Mean Sea Level
KB @ 91.64usft (P-04)
True
Minimum Curvature
EDM R5K - Alaska PROD - ANCP1
7VOSS
NIS
E/W
Northing
Easting
DLeg
V. Sec
TFace
(usft)
(usft(
(usft)
(usft)
(usft)
(°/t00usft)
(usft)
(°(
8,941.94
-2,439.06
4,834.38
5,944,938013
636,159.371
12.00
-2,135.55
-60.00
8,940.29
-2,443.07
4,815.93
5,944,933.691
636,141.001
12.00
-2,118.85
-89.90
8,931.58
-2,476.10
4,722.15
5,944,899.027
636,047.811
12.00
-2,025.77
-8947
8,929.74
-2,485.52
4,703.41
5,944,889.280
636,029.244
12.00
-2,005.36
-89.89
8,922.86
-2,516.48
4,631.21
5,944,857.070
635,957.603
12.00
-1,930.15
89.58
8,914.15
-2,537.88
4,534.11
5,944,833.980
635,860.893
12.00
-1,842.01
89.47
8,910.00 -
-2,540.81
4,486.82
5,944,830.234
635,813.668
12.00
-1,803.90
89.75
91122018 4: 32:28PM Page 6 COMPASS 5000.1 Build 81D
BP
BP Coil Tubing Report
BF�UGHES
GE w,m
Company:
North America - ALASKA- BP
Local Co-ordinate Reference:
Well P-04
Project:
PBU
TVD Reference:
Mean Sea Level
Site:
P
MD Reference:
KB @ 91.64usft (P-04)
Well:
P-04
North Reference
True
Wellbore:
PLAN P -04A
Survey Calculation Method:
Minimum Curvature
Design:
P -04A VVP02
Database:
EDM RSK- Alaska PROD -ANCP1
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
-NI-S
iEl-W
(usft)
(usR)
(usfq
(usft)
Comment
11,487.49
8,790.66
-2,060.11
6,001.37
P-04 Actual Survey
11,515.29
8,810.29
-2,071.26
6,017.60
P-04 Actual Survey - TIP
11,520.00
8,813.61
-2,073.14
6,020.36
KOP
11,540.00
8,827.50
-2,081.23
6,032.26
Start Build 3500
11,570.00
8,845.86
-2,094.53
6,051.84
Start DLS 35.00 TFO 10.00
11,649.73
8,871.29
-2,139.23
6,111.73
Start Tum 35.13
12,019.73
8,903.54
-2,425.13
6,041.14
Start DLS 12.00 TFO 140.00
12,049.70
8,906.87
-2,430.29
6,011.81
Start DLS 12.00 TFO 90.00
12,319.70
8,941.37
-2,395.65
5,749.92
Start DLS 12.00 TFO 30.00
12,382.52
8,944.95
-2,368.46
5,693.45
Start DLS 1200 TFO-40.00
12,491.70
8,935.43
-2,325.41
5,593.83
Start Turn -12.19
12,571.70
8,921.54
-2,306.09
5,517.55
Start OLS 12.00 TFO-130.00
12,699.53
8,910.37
-2,298.48
5,390.82
Start DLS 12.00 TFO -140.00
12,748.52
8,912.30
-2,302.10
5,342.02
Start Turn -12.04
12,948.52
8,927.99
-2,363.88
5,153.99
Start Turn 12.04
13,148.52
8,943.68
-2,425.65
4,965.96
Start DLS 12.00 TFO 40.00
13,197.40
8,945.60
-2,429.28
4,917.27
Start DLS 12.00 TFO -60.00
13,281.05
8,941.94
-2,439.06
4,834.38
Start Turn -12.05
13,421.05
8,929.74
-2,485.52
4,703.41
Start Turn 12.05
13,647.58
6,910.00
-2,540.81
4,486.82
TD at 13647.58
91122018 4'32:28PM Page 7 COMPASS 50001 Build 81D
North America - ALASKA - BP
PBU
P
P-04
PLAN P -04A
Anticollision Summary Report
12 September, 2018
BA ER00
F�UGHES
a GE company
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
P
Site Error:
O.00usft
Reference Well:
P-04
Well Error:
0.00usft
Reference Wellbore
PLAN P -04A
Reference Design:
P -04A WP02
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
Norm Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well P-04
KB @ 91.64usft(P-04)
KB @ 91.64usft (P-04)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
JUGHES
GE co ,,
'eference
P -04A WP02
liter type:
NO GLOBAL FILTER: Using user defined selection & filtering cdtena
aerpolation Method!
MD Interval 25.00usft Error Model:
ISCWSA
iepth Range:
11,487.49 to 13,647.58usft Scan Method:
Tray. Cylinder Norm
'.esuhs Limited by:
Maximum center -canter distance of 1,560.97usft Error Surface:
Elliptical Conic
Survey Tool Program Date 9/12/2018
From To
(usft) (usft) Survey (Wellbore) Tool Name Description
50.30 11,487.49 P-04 Srvy 1 GCT -MS (P-04) GCT -MS Schlumberger GCT multishot
11.48749 13,647.58 P -04A WP02(PLAN P -04A) MWD MWD -Standard
Summary
Site Name
Offset Well - Wellbore - Design
P
P-01 - P -01A - P -01A
P-01 - P-01APB1 - P-01APB1
P-01 - P-01APB2 - P-01APB2
P-01 - P-01APB3 - P-01APB3
P-03. P-03 - P-03
P-03 - P -03A - P -03A
P-03 - P-03AP81 - P-03APB1
P-03 - P-03APB2- P-03APB2
P-04 - P -D4 - P-04
P-04 - P -04L1 - P-0411
P-04 - PLAN P -04A - P-D4A
P-05 - P-05 - P-05
P-05 - P -05A- P -05A
P-05 - P-05PB1 - P-05PBI
P-15 - P-15 - P-15
P-15 - P-151_1 - P-051_1
P-22 - P-22 - P-22
P-26 - P-26 - P-26
Y
Y-27 - Y-27 - Y-27
Reference Offset Centre to
Measured Measured Centre
Depth Depth Distance
(usft) (usft) (usft)
11,787.49 11,925.00 240.79
11,787.49 12,100.00 371.33
No -Go Allowable
Distance Deviation Warning
(usft) from Plan
(usft)
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
11.46 240.79 Pass-NOERRORS
0.67 371.33 Pass-NOERRORS
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
12,08749 12,700.00 916.64 347.13 57567 Pass - Major Risk
9/122018 2: 08:27PM Page 2 of 3 COMPASS 5000.1 Build 81D
Company:
North Amenca- ALASKA -BP
Project:
PBU
Reference Site:
P
Site Error:
O.00usft
Reference Well:
P-04
Well Error:
OAOusft
Reference Wellbore
PLAN P -04A
Reference Design:
P -04A WP02
BP
Anticollision Report
Local Coordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well P-04
KB Q 91.64usft (P-04)
KB @ 91.64usft (P-04)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
BATVER a,
ieference Depths are relative to KB C 91.64usft (P-04) Coordinates are relative to P-04
Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK
ventral Meridian is 150° V0 000 W ° Grid Convergence at Surface is: 1.00°
in
in
1200
0
0
a
2
re
C1
Uw 800
LD
U
0
H
aei 400
U
Ladder Plot
LEGEND
,P-20APBI V2 -d- P-24,P-24PB1,P-24PB1V11 -A-
68-
$ P-20,P-20B,P-20BV8
$ P -15,P -15,P -15V3
-� P -07,P -07,P -07V4
-�- P-07,P-07A,P-07AV3
$ P-08, P-0SA, P -08A V2
$ P-08,P-0SAPB1,P-0eAP81 V1
�♦ P -08,P -08,P -08V1
�(- P-09, P-09, P-09 V1
-rem P -09,P -091.1,P-091-1 V3
-4- P-02,P-02APB1, P-02APB1 V3
$ P-02,P-02A,P-02AV5
O P--2�255,P-299555L1,V555dbi V7 1ADP-28,P-28,P-J§%
PNfEaSt7fe
RQEPf1(25Oo Urn)$ P -13,P -13,P-13\11
$ P-11,P-11L1PB1,P-11 1PB1 VO $ P -01,P -01,P-01 V3
$ P -11,P -11,P-11 V1
-3- P-11,P-11L1PB2,P-ll L1PB2VO
$ P-27, P-27, P-27 V21
$ P-18,P-18L1,P-18L1 V3
$ P -18,P -18,P -18V3
-X- P-30,PJ0PBI,P-30PB1 VO
�- P-30, P-30, P-30 VO
$ P-05, P-05, P-05 V1
$ P-05,P-05P81,P-05PB1 V6
-6- P-01,P-01APB3,P-01AP83V0
$ P-01,P-01APB2,P-01AP132V0
$ P-01,P-01APB1,P-01APB1 VO
$ P -26,P -26,P-26 V5
$ P -10,P -10,P -10V1
-F P-10,P-10A,P-10AVO
-� P -12,P -12,P -12V1
-%
P-1 2. P-1 2APB2, P-12APB2 V1
$ P-12,P-12APB1, P-12AP81 V2
911212018 2:08.27PM Page 3 of 3 COMPASS 5000 1 Build BID
0 hp
Project: PBU
Sale: P
Well. P -O4
WeBuens, Pi -ANP -0
Plan:P WPMW-04IPILANFIYM)
MILL DETALS. P 4
GmunOLeesl: 54.19
•NFS •EFW NoM'mg Easing Le01WEe Loamude
Dun 0.00 .7292.230 5]1263.590 70"15'50]57N 148"56-16821W
Yo- awmalo.n.Il
A
F
50a9N `+IWSS
paM. azfl
awl. n,Au
Wcrnm
WELLBORE DETAILS: PLAN P.
I1EffflBKf 4AG1eM)gN
P -04A
CgaamNMn:lllmerew. weYPo4.ilue Nam
AMtlOTATIONS
YeNw'11`NlflYamm: Yas Sw feral
Parent Wellbore: P-04
em slq.ryoox.00061
s xmnlW)flbum
To gn MD: 11487.49
Mmwme NVll fltlamw rc6N91swan1Pa1
TFace VSed Target
U.1a.A All Mnlmlm C.reN�e
x71.1
SECTIONDETAILS
x]su stare ald 15
AMtlOTATIONS
Sec MD
Inc At wTVD
•NIS
•EI -W
Deg
TFace VSed Target
TVD MD Annolatian
1 11487.49
44.90 12471 079066
-2060.11
600137
000
000-3273.10
8790661148749 PO4 Actual Surrey
2 1151529
45.17 124.27 881029
-2071.26
601760
1.31
-58.78327837
8010291151529 PO4 Actual Survey TIP
3 11520.00
45 ]4 124.20 881361
-207314
6020.36
1.23
-121.18327927
88136111527.00 NOP
4 1154000
4694 12420 882750
-2081.23
603226
900
0.003283.19
8827 5011540 00 Start BuM 3500
5 1157000
5744 12420 884586
.2054.53
605184
35.00
000 -320954
0845861157000 San DLS 35 TO TFO 1000
"11649.73
85.00 128.88 887129
.2139.23
611173
35.00
1000 3306.79
88712911649.73 Start Turn 35.13
7 1201973
85.00 258.85 890354
-2425.13
604114
3500
90.00 -336894
8903541201973 San DLS 12 W TFO 14000
8 12049.70
8225 261.19 090687
.2430.29
61
1200
140.00-3043.16
8906 87 12049,70 SIaitDLS 1200 TFO 9000
9 1231970
83.46 29383 894137
-2395.65
574992
1200
90.00 286480
89413712319.70 Start DIS 1200TFO 3000
10 1230252
90.00 29759 094495
-236846
5693.15
1200
30.00 283902
89449512382.52 Start DLS 1200 TFO 4000
11 1249170
10000 28908 8935.43
-232541
559303
12 OD
40.00-2790.30
89354312491,70 SIarITum-1219
12 1257170
10000 27933 892154
-2306.09
551755
1200
-9000 274436
8921541257170 StudDLS1200TFO-73000
13 12699.53
9000 26764 891037
229848
539082
1200
-13000 2652.17
8910 37 12699 53 StarIDLS1200TF0-14000
14 1274852
8550 16385 891230
-230210
534202
1200
-04000 `261246
8912301274852 Straffrin-1204
15 1294852
8550 23977 892799
-236388
515399
12011
-90W 2428.71
9927 99 12948,52 SIzrITum1204
16 1314852
8550 263.85 894368
242565
496596
IUD
90.00 224496
89436813148.52 Sta110L51200TF04000
17 1319740
9000 267.62 894560
-2429.28
491727
1200
40.00 220534
8945601319740 Start DLS 1200 TFO 6000
18 1320105
9500 25890 894194
-2439.06
463438
1200
60.00 .2135
8941941328105 StarlTum-1205
19 1342105
9500 142.03 8929.74
-2485.52
4703.41
12.W1
-9000-200536
8929 74 13421,05 Start Turn 12.05
20 1364758
9500 269.33 891000
.254081
448682
1200
90.00 -1803.90
891D0013647.58 TD at 13647.58
x71.1
�
x]su stare ald 15
,awls i W lvO lua.
PMnamllau,-nr
xIN _
x'110 Y7i114 DU .Ymnpl:vn-ItIWn'
11
1.11111 s-1 Tim 3511 -
- 1181'
X0.11
p 4WU
MA l'1
o:
P-04AFault 1
Yl
n $sP
*-
n
�a",`nnRlYz
P -04A FeW12
u m
smAnts lxuul Ph 1405.
�
r
sIM DUS 12a IR)WW
w nl
j
H
v1'u
.1"
120D
�
-IOW
16gD
P -u
-ism
p 4WU
P-04AFault 1
*-
L
CO" 74W
P -04A FeW12
r
y 78W
BAKE ES
P -04A WP02
51 /Z" r) 5/8" Uual Sv ing E ail -TOW S
n
Y-04 P-041.1
P-WATI
P4 AT3 PA AT2
P -04I
O PA ATS
U1 P -04A WP02
a6ro0
-320 P-1111.1
In1.1P
-34M
+)
-36W
Y -IB P -151-I
-3BW
I'-141,1 jr"IS
34W 3500 38011 4000 42W MOU 4600 48M 5000 5248 54M 5600 56W mutt 62M 6,100 6600 68M 7000
West( -)/East(+) (200 ustl/in)
P -04A WP02
.A 11
PAli
A T2
'fimtm, u. 6lan'mm mw
AWn'rmo-1219 l %an Tam -1204
YIrn0L5 12aTI040an slwlm Y 13W00.1400
suet We II GO W.3n 00
.All 1'+NA WIYI.
na4ATJ
,A'rum li as
tiW ram -1105
Alault512.111'f1-ria. Uol l]W]ix
1. DIA r21U'11114U W
92nn-
Me6nse9llfYgl-34uu d>5V J)a -llsu 2x21 ."ll -JIW -3u1u -1. M. -2wm -1050 .I8W .2750 -2IDu 'esu -MOu -sW -2500 -1430 -2000 Q150 1)pa ..30 :71X1 -21Au -21a =050 -air;. -Ivw -I'N. -Ins. aaa n50 -Ila -1(011 ... -15511
Vertical Section at 230.00° (50 usfl/in)
016
re J)p
Project: Pau
Site: P
Well: P-04
Wellbore: PLAN P-0 A
Plan: P -04A WP02 (P-041PLAN P44A)
03
ANTLCODUSION SETTINGS
^ P-09, "War, "Wal Vt
COMPANY DETAILS: NOMAnaaica-ALAWIA-BP
IMerpoleaan McMod: MO,interral:26.00
• P-30, P30, P-30 W
Calaleaon MCMad Minimumcumane
Depta Range From: 11487.49 To 13647.5a
^ P42. R12911, P-12MI W
Encir Stearn ISCIASA
Results Unrilet By: Centre Entrance: 1560.97
• P-14, P-14, 0.14 V1
San Method Tn, Cygnter Nonh
Reference: Ran: 0.04A M02(P-04RLAN PU4A)
- P-01. P WU, 0.01APB2 W
Ener Surface: EI9p0cYCOnic
> P-20, P40A P20A V1
- PL9, PW, P -(n) V1
blaming Metbad Rules Beset
Ladder Plot
Measured Depth (100 usfttin)
gAJUGHES
From Colour To MD
11487 -11800
11800-- 11900
11900— - --13648
• P O P-IDM131, P-20AP01 W
^ P-09, "War, "Wal Vt
• P W, P 06A, P -WA V5
- 0.25. P35, 0.25 VS
• P-30, P30, P-30 W
• 0.15, P -06A P-1 W W
• Pot, P'01APB3, P-01gPB340
^ P42. R12911, P-12MI W
P-20. 0.20. P -2p V1
- P P4, P48 V1
• P-14, P-14, 0.14 V1
- P-11, P-11OP181, P -111-I 31 VO - P-05, Po5, PAS Vt
- 0.15, P-16, 0.16 V1
- P-01. P WU, 0.01APB2 W
- P-12, R128, P-129 V5
> P-20, P40A P20A V1
- PL9, PW, P -(n) V1
P -IT R1711, 0.1]1-1 VO
- P-11. P -11L1, 1 1110 W
- P-05, P45PB1, P -05P31 W
- X19, P-19,1-19
• P-01, PL26,12 , P-01APB1 W
- P41, P -4A, V1
- P-20 P-20& Vfi
• P49, PoBL1, P-091-1 W
• P -M R17, P-17 V3
• P-11, P-11, YI
• P4S, PUSH 0.05.4 Vi
- P-19. P -19L1. 91 W
• Pd6, 0.26, 0.26 VS
4 P-OLL1, P4I Vt
-15 V
- 0.15, PAS P -t5 V3
- P-02, P g P-02APB1 V3
• 0.23 P-29 P-33 V1
lie
- 0.11, P -27. 1P02, LtPB2 VO - P-03, P-03.132 RWMBt
- P-18, BI, P1
PBt, 0.iBL1PB1
W - P-10, P-10, P-10
lr
P-04 PLAN ,k c
0. PU4q W
- P-15. P-15Lt07
..P-02. P0Q, PUW
-G
=0.23,1Pe, P-23AV0•P-2],
0.2],P3]V31
I
-PL3 PA3MB2 P-0W82W
W
-+ 0.38, P -2B, R2a V0
Fr4rS,
A
-P-10. P10A0.10V1
Fr
.. P -0a, P -W, PM Vfi
• P07, P -p], 0.0] V4
V4
• PA3, P-03, P -02V1
24%13q%mR
s 0.34, 0.Z4P91, P-24PBt Vtt
. P-1 S. 0.191-1, P16L1 W
. PUi Po3A PASA W
• P-13, R13. 0.1] Vt
. P-4. R4. P -R Vt
- Y-37, V -P, Y -P V1
• P-07, P -07A Po]A V
• 0.06, PLB N. Vt
P-24, P-24, P-24 V1
- 0.18.0.16, P-18 W
- P-0} P-03, P-03 V1
- P-01, P-01,0.01 W
. P-12. P -I2 Z, 0.120PB2 V1
• P-2; P-22, P-22 Vt
o POa P-0BA P08AW
. R06, PMB, PLEB V4
•• P25, 0.251-1, 0.2511 W
- P10, 0. OPB1, P-30PB1W
« 0.16 P-16PPB1. P-Iwel VO
- P-01, MIA, 0.01AW
-•P-02,P-02M111, 0.12APB1W
PU4A M02
Project: PBU ANTI -COLLISION SETTINGS COMPANY DETAILS: North Americe-ALASKA-BP J BA ER Q
0 by Site: P Interpolation Method: MD,interval:25.00 Calculation Method MinimumCurvaWre L GHES
Well: P-04 Depth Range From: 11487.49 To 13647.59 Error System: ISCWSA
Wellbore: PLAN P.04A Results Limited By: Centre Distance: 1560.97 Scan Method: Tran. Cylinder North
Plan: P-04AWP02(P-04/PLAN P.04A) Reference: Plan: P-04AWP02(P-04/PLAN P -04A) Error Surface: Elliptical Conic
Wamin Method: Rules Based
Depth Range: 11487.49 To 13647.58 From DGIGMr To 11487-- -11818
00
Possible Magnetic Interference: 00 11800 11900
From KOP to 11,800' MD 39A �- 11900 -13648
Contaptlnto: 25
Jose Va79ue7 Tech SuppOrnWeIIF
7144784339 Cel Phone
Tai Sturdivant DD Coordinator
907-20562`]4 Cell Phone
Patrick Rioer MWDCoordinator
9079523497 Cep Phone
Carl UNch Operations Manager
907-382-5534 COPho.
.. Lewy 44.1;
.wa .64v Noma.; a..a; wmm. _a,.i
no; aw 9M72lia. u1:uM4 rrlsmrnN I.P.1.421W
see MD m; Azi TVD .Nls «E.w Child TF.. VSW
1 11487.49 44.90 124.]1 8780.66 .2060 11 6001.37 0.00 0.00 .3273.10
2 11515.29 45.17 12d.T1 8810.29 4071.26 6017.60 1.31 -58.70 .327837
3 11520.00 45.14 124,20 8813.61 -2073.14 6020.36 1.23 -121.18 .32]9.2]
4 11540.00 46 94 124.20 0827.50 -2081.23 6032.26 9.00 0.00 -3203.19
5 115]0.00 5].44 124.20 BB46.86 2084.53 6051.04 35.00 0.00 .3289.64
B 1164953 x5.00 128.88 8871.29 -2139.23 6111.73 35.00 10.00 -330629
7 1201 .7385.00 258.86 8903.54 -2425.13 041.14 35.00 9000 -3060.94
8 12049.70 82.25 261.19 8906.07 -2430.29 6011.81 12.00 140.00 -3043.16
912319.]0 83.46 293.83 8941.37 -2395.65 5749.92 12.00 90.00 -2864.80
10 12382.52 90.00 297.59 8944.95 -2388.46 569345 12.00 30.00 -2839.02
11 12491.70 100.00 289.08 0935.43 .2325.41 5593.83 12.00 -40.00 -2790.38
12 125]1.70 100.00 279.33 0921.54 -2306.09 5517.55 12.00 -90.00 -2744.36
13 12699.53 90.00 267.64 8910.37 -229B.48 5390.82 1200 -130.00 -2652.17
14 12740.52 85.50 263.05 8912.30 -2302.10 5342.02 12.00 -140.00 .2612.46
15 12940.52 05.50 239.77 5927.99 -2363.88 5153.99 12.00 -90.00 -2428.]1
16 13140.52 85.50 263.85 8943.68 -2425.65 4965.96 12.00 90.00 2244.96
17 13197.40 90.00 26762 8945.60 -242928 4917.27 12.00 40.00 .2205.34
18 13281.05 95.00 2511,90 8941.94 4438.08 4034.30 12.00 60.00 -2135.55
19 13421.05 95.00 242.03 8929.74 -2485.52 4703.41 12.00 -90,00 -2005.36
20 13647.58 95.00 269.33 8910.00 -2540.81 4406.82 12.00 80.00 -1803.90
SIIRYEt'gpGRAY
gytll Fran 0,011 To Somwr , iad
50.30 1148]49 N(e"13M-MS(l GCT -MS
114erl9 13647.5a Pmuvaoz (PIPN Pd4AI MVA
00 LEGEND
180 • P.m, eL , Pmu v,. v -n, v -n, rm v1 20 240 60
., aw, PAI. P-oa A 180
Azimuth from North [a] vs Centre to Centre Separation [10 usft/in] Azimuth from North rl as Centre to Centre Separation 140 us0llnl
20
North America - ALASKA - BP
PBU
P
P-04
PLAN P -04A
P -04A WP02 Plus 500ft MD
AOGCC Offset Well Report
12 September, 2018
BA ER 021
HaUGHES
GE company
Company:
North America - ALASKA - BP
Project:
PBU
Reference Site:
P
Site Error:
O.00usft
Reference Well:
P-04
Well Error:
O.00usfl
Reference Wellbore
PLAN P -04A
Reference Design:
P -04A WP02 Plus 500ft MD
BP
Anticollision Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well P-04
Mean Sea Level
KB @ 91.64usft (P-04)
True
Minimum Curvature
1.00 sigma
EDM R5K - Alaska PROD - ANCP1
Offset Datum
BqUGHES
GE,.,,
Reference
P -04A WP02 Plus 500ft MD
Filter type:
NO GLOBAL FILTER: Using user defined selection & filtering criteria
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
11,487.49 to 14,147.58usft Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 200.00usft Error Surface:
Elliptical Conic
Survey Tool Program _-- Data 9/12/2018
From To
(usft) (usft) Survey (Wellbore) Tool Name Description
50.30 11,487.49 P-04 Srvy 1 GCT -MS (P-04) GCT -MS Schlumberger GCT multishot
11,487.49 14,147.58 P -04A WP02 Plus 500ft MD (PLAN P -04A MWD MWD -Standard
Summary
Site Name
Offset Well - Wellbore - Design
P
P-04 - PLAN P -04A- P -04A WP02
y
Reference Offset Centre to
Measured Measured Centre
Depth Depth Distance
(usft( (usft) (usft(
13.625.00 13,625.00 000
9/122018 4: 22 54P Page 2 of 2 COMPASS 5000.1 Build 81D
WELLBORE DETAILS: PLAN P-04A
Protect: PBUSite: �.
-
V11MeKAbeER
Yry`WNleore:
sstimlve�8derexa sbi
yUGHM%an:
rsebmxe ee
"
Nk
^^"^+
P
P.00
M.a
SJIS]AES�
��b.. PLANP-04A
0
ao
ny�mreeoepn
P-04AWP02%usfi00NM0 P-O/IPLAN P94A
( I
WII,/<,
rnme
Easton RW usPLnl
Easling (200 uabn)
Mean Sea Leval
TREE= 4-1/16'FTSCIIN
VVI =
CNV
AC:RYITOR=
BAKBRC
INIAL KB. E E
91.64'
OF. B.EV =
55.26'
KOP=
17W
wxAnple =
98' @ 13050
Datum MD=
11501'
Datum TVD =
8800 SS
273V
Minimum ID = 2.38"@11537'
2-7/8" LINER CONNECTIONS
ITOP OF 5-12' LN1R
4-1/2' TBG, 12.69. NT -1315R TDM,
.0152 bpf, D = 3.958'
22-7/8LNR, 11531'
1= 8.875' 11541'
ORATION SUMMARY
REF LOG: AWS BHCA ON 0626/91
ANGLE AT TOP PERF: 45' (9 11509'
We: Refer to Production DB for historical perf data
SIZE I SPF I INTERVAL I Opn/Sgz SHOT SCIZ
P-04
35/8'
6
DATE
O05/18933-38'
3110
3010
37
6
O11537
07/16191
07/13/17
3-38'
4
I'11=11692
11692-11712
O
07/16/91
DOME
318'
4
11722-11768
O
0711281
7163
P -04L1
2'
4
11750 - 12420
O
08 AW
2
2-78'
1 SLID
11748-13097
O
05/02!00
BK
P-04
L1
w
SAFE1 . NOTES: WELL ANGI 70° @ 11694*
CHROME TBG 6 LNR —
GAS LFT III ISS
ST
M)
ITVDIDEVITYPEI
7-58' X 4-12' TNV HBBP Wlk D = 4-0-
11237-
VLV
LATCH
F1DRi
DATE
5
3110
3010
37
CA
DOBE
BI(
12
07/13/17
4
6765
5456
50
CA
DOME
BK
16
07113/17
3
9225
7163
41
CA
DOKE
BK
16
07113/17
2
10593
8211
39
CA
• DMY
BK
0
10117/13
1
11204
8680
44
CA
SO
BK
28
07113/17
STA # 2 = OMY WAS WENDED PACKING
11231' I-IRIGHT
HAND RELEASE LATCH
11232'
7-58' X 4-12' TNV HBBP Wlk D = 4-0-
11237-
5-12' MLLOUT EX7BNSDN, D = 4.885'
11253'
41/2' PKR SW --SNP,
1 11275' 1
X 512' HYD LNR w /
11285 E Lw TT LOGCED 07/12191
1 11531' 1
MLLOUT WINDOW (P-04 L7) 11549'-11555-
PERFORATION
1549'-11555'
V
2-78' SLTD LW 8.16#, L-80 STL, .0058 bpf, D = 2.441' 1308T
DATE
REV BY I COMMENTS
DATE
REV BY COMMENTS
07112191
ALAI 2 INITIALCOMPLETION
1022113
?/ RIC GLV Cl0 (10/17/13)
05/03110 NORDIC i SIDETRACKCOMPLE ION
05107/14
TBI GLV CC (05/02114)
06/16113
JTG1 PJC GLV CIO (06109113)
07/17/17
CRYJAD GLV CJO (07113/17)
06116/13
PJC P-04 8 PA4L1 LATERAL CRP
07/18/13
RK7/JLD GLV CIO (07104/13)
10116/13
L19PJC TREEClO(10111113)
R3AHOE BAY Ll1T
VALL: RD4 l Ll
PERMIT W:`2000500
API W: 50-029-22180-60
SEC 31, T7IN, RBE, 2564' FSL 8 2301' PAL
BP 6Kploradon (Alaska)
lim
VM3LFEAD=
D-19.124'
CMI
ACTUATOR=
TVD= 8800 SS
PML KB. BF
91.64'
BF. ELEV =
55.26'
KOP=
1700'
Max Angle -
-
'
--u
D3t ��_
07/13/17
Datum
6765
SAFE.. NOTES: WELL ANGLE' 70°@ _'. VAX
DLS: @ _' — CHROME TOG 8 LNR
GAS LFT MANDRILS
ST
MJ
TVD
TVD= 8800 SS
TYPE VLV
V4' CSG, 45.50, NT -a0 BUTT. D = 9.950• L'
DATE
5
Minimum ID =
_"
SAFE.. NOTES: WELL ANGLE' 70°@ _'. VAX
DLS: @ _' — CHROME TOG 8 LNR
GAS LFT MANDRILS
ST
MJ
TVD
DEV
TYPE VLV
LATCH FORT
DATE
5
3110
3010
37
CA DOME
BK 12
07/13/17
4
6765
5456
50
CA DOME
BK 16
07/13/17
3
9225
7163
41
CA DDM_
SK 16
07/13/17
2
10593
8211
39
CA • OMY
SK 0
10/17/13
1
11204
8660
44
CA SO
BK 28
07113/17
STA # 2 = DMY HAS EXT@D® PACKING
11� 4-12' PKR SVVS NP. D = 3.8•
j7-518•X4-12•TiWH88PFKRD=4.o'
5-12.1MLLOUT wn3gsDN, D = 4.865'
4-1/7 PKR SVVS NIP. D = 3.813'
TOP OF _ LNR
Note: Refer to RoducbDn DB for hisbrtcal pert data
SIZE
STF
11260' 3.70• DEFLOY SLV. D = 3.00•
OpnlSrg
DATE
SOZ
05/22/18 JM] BUILT PROPOS®
12 4-1R(RSWNNP, BEHIND
175' 2'
MLLED = 3.80• (0427/00) CT LNR
7OPOF S12'LNi 112&1'
11284' 7-5/8•X5-12'HYOLNiwl TEBK SLV,D=7
4-12' TBG, 1=2.88, NT-13CR 7115. 11288'
11288' 4-/2' VYLEG, D= 3.958'
.0152 bpf, D 3.958'
11286' ELMD TT LOGO>� 07/12191
4-12• PKR VNOPSTOCK(XX/XX/XX) 11620'
MLLOUT WNDOW (P -04A) 11520'-11530'
5-12' LW 17#, NT13CR..0232 bpf, D= 4.892• -11620'
7-518' CSG, 29.7#, Nrw-HS NSCC• D = 6.875• -11620'
D = 2.85•
PERFORATION SIAIARY
REF LOG: _ ON 10GXX/XX
ANGLE AT TOP PERF '@— I
Note: Refer to RoducbDn DB for hisbrtcal pert data
SIZE
STF
MHTVAL
OpnlSrg
DATE
SOZ
05/22/18 JM] BUILT PROPOS®
FBTD
.0758 bpf • D = 2.441
DATE REV BY I OORUNTS
DATE REV BY COMMENTS
07112/01 A1D12 INITIAL COMPLETION
05103100 NDRDIC 1 SIDETRACK COMPLETION
-
_I_I_ CTD ST (P -04A)
05/22/18 JM] BUILT PROPOS®
PRIAFDE BAY UNIT
WT3L PL04A
PBMT ND
ATI ND: 50-029-22180-02
f11 R R13E 2564' FSL 8 2001' FWL
BP ExpbTabon (Alaska)
Well Bighole CDR2-AC 4 Ram BOP Schematic Date 21-NOV-17
Quick Test Sub to Otis 1.1 ft —
Top of 7" Otis O.Oft ---
—._._._ _
_–CDR2 Rig's Drip Pan
Distances from top of riser
Excluding quick -test sub
Top of Annular 6.0 ft
Top of Annular Element 6.7 ft
Bottom Annular
CL Blind/Shears 9.3 ft �1111"
CL 2-3/8" Pipe/Slips
B1 B2
Kill Line
CL 2-3/8" x 3-1/2" VERB 12.6 ft
CL 2-3/8" Pipe/Slips 13.4 ft
CL of Top Swab 16.0 ft
CL of Flow Cross 17.4 k
CL of Master 18.8 ft
LDS O
LDS O
Ground Level
�— 7-1116" 5k Flange X 7" Otis Box
drill 7 1116"
Annular
B3
I Swab
T1 e T2
Master
y■ IA
U
OA
Choke Line
Test Pump Hose
TRANSMITTAL LETTER CHECKLIST
WELL NAME:
/ PTD:
Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: ✓!� POOL:
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
(If last two digits
No. , API No. 50- _
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150 - _ Well Name: PRUDHOE BAYUNIT P -04A Program DEV Well bore seg ❑ I
PTD#:2181160 Company BP EXPLORATION !ALASKA) INC. Initial Class/Type PEND GeoArea 890 Unit 11850 On/Off Shore On Annular Disposal ❑
Administration
17
Nonconven. gas conforms to AS31.05.030Q.1.A),Q,2.A-D) - - ..... ..NA
-
- - - - - - - ------ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . .
1
Permit fee attached --.. ..... ...................
NA
....... ---..-......-.---.--....--.--..
2
Lease number appropriate .... - - - -
Yes -
- - - - Entire Well lies within ADL0028288.
3
Unique well name and number .. . . .. . . . . . . . .
Yes
- - - - - - - - - - -
4
Well located in a defined pool ...
Yes
.. . PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341F - - - - - -
5
Well located proper distance from drilling unit boundary- - - - - - - - - - - - - - - - - - -
Yes -
- - - CO 341F, Rule 2:. There shall be no restrictions as to well spacing. except that no pay shall be -
6
Well located proper distance from other wells - - - - - -
Yes
- opened in a well closer than 500 feet to -the boundary of theaffectedarea, Planned well conforms to - - - - - -
7
Sufficient acreage. available in drilling unit..
Yes
CO 341 F, Rule 2.
8
If deviated, is. wellbore plat included - - - - - - - - - - - - - - - - - - - -
Yes
- - - - - - - - - - - - - - - - - - -
9
Operator only affected party - -
Yes
.
10
Operator hasappropriatebond in force - - - - -
Yes
- - - - - - - -
Appr Date
11
Permit can be issued without conservation order..
Yes
- - -
12
Permit can be issued without administrativeapproval- - - - - - -
Yes
- - - - - - - - - - - -
SFD 9/28/2018
13
Can permit be approved before 15 -day -wait- - - - - - - - - - - - - -
Yes -
- - - - - - - - - - - - - - - - -
14
Well located within area and strata authorized by Injection Order # (put. 10# in comments) (For
NA
-
15
All wellswithin1/4. mile area of review identified (For service well only) ... . . . ........ .
NA
16
Pre -produced injector; duration of pre production less than 3 months (For service well only) _ -
NA
18
....... . . . . . . . . . . ........... - - ..
Conductorstring.provided... - -
NA -Conductor-
- - set in PBU P,04- -
-
Engineering
19
Surface casing protects allknownUSDWs - - - - - - - - - -
NA
- Surface casing set in PBU P-04 - -
20
MT vol adequate to circulate on conductor & surfcsg ........... _ ...
NA
Surface casing set and fully cemented _
21
CMT vola nate to tie-in long string to surf csg- - - - - - - -
NA
- -
22
CMT. will coverall knownproductivehorizons.. - - - - - - . - - -
Yes
Productive interval will be completed with. cemented production. liner and perforated
23
Casing designs adequate for C,. T, B &. permafrost- ...........
Yes
- - - - - - -
24
Adequate tankage. or reserve pit - - - - - - - - - - - - - - - - - - -
Yes
Rig has steel tanks; all waste to approved disposal wells
25
If a. re -drill, has. a 10-403 for abandonment been approved . . . . . . . .............
Yes
. PTD 191. -076, -Sundry 318-373....... - - .... .
26
Adequate wellbore separafion proposed- - - - - - - - - - - - - -
Yes
Anti -collision analysis complete; no major risk failures -
27
If diverter required, does it meet regulations - - - - - - - - - - -
NA
- - - - - - - - - - - - - - - - - - -
Appr Date
28
Drilling fluid program schematic ,& equip list adequate ..
Yes
Max fomtation pressure is $267 psig(7.05 ppg. EMW),' will drill w/ 8.6. ppg EMW - - -
VTL 10/3/2018
29
BOPEs, do they meet. regulation . ............ - ...
Yes
- ....
30
BOPE press rating appropriate; test to (put psig in comments)- - - - - -
Yes
MPSP is 2389 psig; will test BOPS to 3500 psig - - - - - - - - - -
31
Choke manifold complies w/API RP -53 (May 84) - - - - - -
Yes
- - - - - - - - - - - - - -
32
Work will occur without operation shutdown... - . - - - -
Yes
33
Is presence of H2S gas probable - - - - ..
Yes -
- - - H2S measures required - - - -
34
.Me-0anical.condition of wens within AOR verified (Forservice well only) -
NA
35
Permit can be issued w/o hydrogen sulfide measures .... - - - -
No -
- - Drill. Site P. wells are H2S-bearing.. 112S measures are required, - - - - -
Geology
36
Datapresentedon potential overpressure zones - - - - - - - - - -
Yes ....
Expected reservoir pressure is 7,1 ppg EMW; will be drilled using 8.6 ppgmud& coiled tubing.
Appr Date
37
Seismic. analysis of shallow gas. zones - - - - -
NA
- - Planned mud weights are adequate to control the. operator's forecast of most likely pore pressures.
SFD 9/28/2018
38
Seabed condition survey (if off -shore) - - - - - - - - - - - - - - - - - - - -
NA
- - - - - -
39
Contact name/phone for weekly. progress reports [exploratory only] . .. - -
NA
- - - -
Geologic Engineering Public
Date: ate
Commissioner: DCommissioner: DC Date
It