Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-116DATA SUBMITTAL COMPLIANCE REPORT 4/29/2019 Permit to Drill 2181160 Well Name/No. PRUDHOE BAY UNIT P -04A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-22180-01-00 MD 13602 TVD 9016 Completion Date 1/10/2019 Completion Status 1-0I1 Current Status 1 -OIL UIC No REQUIRED INFORMATION Mud Log No V Samples No ✓ Directional Survey Yes VIZ DATA DATA INFORMATION - List of Logs Obtained: MWD/GR/RES (from Master Well Data/Logs) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH I Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 30239 Digital Data 11304 13602 1/14/2019 Electronic Data Set, Filename: P- 04A_LW D_ FINAL_ FIELD_COMPOSITE_03Jan2 019_BHI_CTK.Ias ED C 30239 Digital Data 1/14/2019 Electronic File: P- 04A—GR _ Res_ 03JAN2019_MD_FINAL_FIELD_B HI_CTK.cgm ED C 30239 Digital Data 1/14/2019 Electronic File: P- 04A_GR_Res _ 03JAN2019_TVDSS_FINAL_FIEL D_BHI_CTK.cgm ED C 30239 Digital Data 1/14/2019 Electronic File: P- D4A_GR_Res _ 03JAN2019_MD_FINAL_FIELD_B HI_CTK.pdf ED C 30239 Digital Data 1/14/2019 Electronic File: P- 04A_GR_Res _ 03JAN2019_TVDSS_FINAL_FIEL D_BHI_CTK.pdf ED C 30239 Digital Data 1/14/2019 Electronic File: P -04A Final Field Surveys.csv ED C 30239 Digital Data 1/14/2019 Electronic File: P•04A Final Field Surveys.xlsx ED C 30239 Digital Data 1/14/2019 Electronic File: P -04A Final Survey Report.txt ED C 30239 Digital Data 1/14/2019 Electronic File: P -04A Final Surveys.pdf ED C 30239 Digital Data 1/14/2019 Electronic File: P-04A_25_tapescan_BHI_CTK.txt ED C 30239 Digital Data 1/14/2019 Electronic File: P-04A_5_tapescan_BHI_CTK.txt ED C 30239 Digital Data 1/14/2019 Electronic File: P-04A_output.tap ED C 30239 Digital Data 1/14/2019 Electronic File: P - 04A_ GR_ Res_ 03JAN2019_MD_FINAL_FIELD_B HI CTK.tif AOGCC Pagel of'2 Monday, April 29, 2019 DATA SUBMITTAL COMPLIANCE REPORT 412 912 01 9 Permit to Drill 2181160 Well Name/No. PRUDHOE BAY UNIT P -04A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-22180.01.00 MD 13602 TVD 9016 Completion Date 1/10/2019 Completion Status 1-0I1- Current Status 1-0I1 UIC No ED C 30239 Digital Data 1/14/2019 Electronic File: P- 04A_GR Res_ 03JAN2019_TVDSS_FINAL_FIEL D_BHI _CTK.tif Log C 30239 Log Header Scans 0 0 2181160 PRUDHOE BAY UNIT P -04A LOG HEADERS Well Cores/Samples Information: Name INFORMATION RECEIVED�.� Completion Report ./ 1 Production Test Informatio0 YID/ NA Geologic Markers/Tops COMPLIANCE HISTORY Completion Date: 1/10/2019 Release Date: 10/10/2018 Description Comments: Complier Sample Interval Set Start Stop Sent Received Number Comments Directional / Inclination Data Y& Mud Logs, Image Files, Digital Data Y / Core Chips Y / Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files Y0,/ Core Photographs Y / 1�A Daily Operations Summary Cuttings Samples Y / n,v I Laboratory Analyses Y / A Date Comments Date: AOGCC Page oft Monday, April 29, 2019 STATE OF ALASKA \LASKA OIL AND GAS CONSERVATION COMMIS' N WELL jMPLETION OR RECOMPLETION REPO, AND LOG HEGE-AVER F 75 1, 7 oma Is Well Status: Oil 21 ' Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1b. Well Class: 20AAC 25.105 201= 25.110 GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One Development 21 Explofab ye ❑ -..-.^ Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6, Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 1/10/2019 218-116 ' 3. Address: T Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 12/24/2018 50-029-22180.01-00 " 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 1/2/2019 PBU P -04A - 9 Ref Elevations KB 91 64 17. Field/Pool(s): Surface: 2564' FSL, 2001' FWL, Sec. 31, T1 IN, R1 3E, UM Top of Productive Interval: 140 FSL, 2917' FWL, Sec. 32, T11 N, R13E, UM GL 53.80 BF 53.80 PRUDHOE BAY, PRUDHOE OIL 10. Plug Back Depth(MD/TVD): 18. Property Designation: Total Depth. 21' FSL, 1480 FVL, Sec. 32, T1 IN, R1 3E, UM ' 13548' / 9009' I ADL 028288 41b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 631284 . y- 5947292 Zone - ASP 4 • 13602-19015- 88-016 TPI: x- 637256 y- 5944974 Zone - ASP 4 12. SSSV Depth (MD/TVD): 20 Thickness of Permafrost MD/fVD: Total Depth: x- 635821 y- 5944829 Zone - ASP 4 None 1970' 5. Directional or Inclination Survey: Yes 0 (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-chill/Lateral Top Wndow MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (11 MSL) 11519'/ 8905' 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma my, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWO/GR/RES 23. CASING, LINER AND CEMENTING RECORD CASING I WT. PER I FT. GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" 42' 122' 42' 122' 30" 260 ax Arctic Set (Approx.) 10-3/4" 45.5# W -m 41' 2734'" 41' 2691' 13-1/2" 2622 cu 8 Permafrost 7-5/8" 29.7# W-95HS 38' 11519' - 38' 8905' 9-7/8" 1742 cu it Class'G' 5-1/2" 17# 13Cr80 11284' 11519' • 8738' 8905' 6-3/4" 170 cu 8 Class'G' -1/2"x3-1/4" 9.3#/6.6# 13CM5 11261' 13602' 8721' 9016' 4-1/4" 91 sx Class'G' x2-7/8" /6.5# 24. Open to production or injection? Yes El , No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): GRADE DEPTH SET (MD) PACKER SET (MD/TV 4-1/2" 12.6# 13Cr80 11288' 11242'/ 8708' 2" Gun Diameter, 6 sof 1/9/2019 12410'- 12586' 9038'- 9021' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 12765'- 12793' 9017' - 9017' COMPLETION Was hydraulic fracturing used during completion? Yes ❑ No 2 Per 20 AAC 25.283 (i)(2) attach electronic and printed information 12855' - 12955' 9017' - 9014' 13100' - 13315' 9009' - 9007' DA-rE 13350'- 13460' 9008'- 9005' ! O VE721FI£D DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 2500' Freeze Protect w/ 35 Bble Diesel 27, PRODUCTION TEST Date First Production: January 23, 2019 Method of Operator, (Flrwnng, gas IA, etc.): Gas U8 Dale of Test: 125/19 Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Sive Gas -Oil Ratio: 12 Test Period --w 78 219 579 91 3025 Flow Tubing 240 Press Casino Press: 1900 Calculated 24 Hour Rate y Oil -Bbl: 145 Gas -MCF: 438 Water -Bbl: 1158 Oil Gravity - API(cam: WA Form 10-407 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only 28. CORE DATA I Conventional Corals) Yes ❑ No 0 Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071, 29, GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MID TVD Permafrost - Top Well Tested? Yes ❑ No 0 Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 12108' 9007' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Shublik 11539' 8918' Sadlerochit - Zone 4B 12108' 9007' Formation at total depth: Zone 4B 12108' 9007' 31. List of Attachments: Summary of Daily Drilling Reports, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070, 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Contact Name: Hyatt, Trevor Authorized Title: SIM Spe lis Contact Email Tmvor.Hyatt@bp.com Authorized Signature: D - Z h I Contact Phone: +1 907 564 4627 INSTRUCTIONS General: This form is designed for su mitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item Ia. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (fop of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15, The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the date pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals coretl and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only VALLFEAD= CIVY ACTUATOR= REFLOG BKR MVYD'GWRES ON 01/03/19 INITIAL KB. ELE 91.64' BF. ELEV = 53.8' KOP= 1700' Max Angle = 97' @ 12501' Datum AD= 11501' Datum ND= 8800'SS 9, H-40, =19.124' = 9.950' Minimum ID = 2.31"@11274' 2 -718"X -NIPPLE IN LTP ITOPOF3-1/2'X31/4"X2-7/8'LNR 11 11270' 1 4-1/2" TBG, 12.69, NT-13CR TDS, 0152 b0f. ID = 3.958' 3-12' LNR, 9.3#, 13CR-85 STL, .0087 bpf, D = 2.992" DELTA V*VS700Kw2 PA PPTAGS 5-12' LNR, 17#, NT13-CR .0232 bpf, D = 4.892- 3-114' LNR, 6.6#, 13CR-86 TCI, .0079 bpf, D = 2.85' 1 11288' I D = 2.441' SA Y NOTES: WELL ANGLE> 70° @ 11600'. MAX P -04A DL, 3.6'@11630'—CHROMETBG&LNR" GAS LFT MANDRELS ST PBWORATION SLMTMRY TVD REFLOG BKR MVYD'GWRES ON 01/03/19 TYPE ANGLE AT TOP PERF: 94' 0 12410' Note: Refer to Roductim DB for historical pert data SIZE SPF INTERVAL Opn/Sgz DATE SOZ 2 6 12410-12586 O 01/09/19 2 6 12765 - 12793 O 01/09/19 2 6 12655-12955 O 01/09/19 2 6 13100 - 13315 O 01/09/19 2 6 13350 - 13460 O 01/09/19 D = 2.441' SA Y NOTES: WELL ANGLE> 70° @ 11600'. MAX P -04A DL, 3.6'@11630'—CHROMETBG&LNR" GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DOTE 5 3110 3010 37 CA DOHS BK 16 0121119 4 6765 5456 50 CA SO BK 20 01/21/19 3 9225 7163 41 CA OW BK 0 10/02/18 2 10593 8211 39 CA • DMY B< 0 10/17/13 1 11204 8680 44 CA DMY B< 0 10/02/18 ' STA 9 2 = MY HAS EXTENDED PACKING PKR SWS NP. D = 3.813' 17-518- X 4-12- TW HBBP PKR D= 4.0" 5-1/2' MLLOUT EXTENSION. D = 4.865' 45KB LTPw/2' PUP& PISA 1-1/2' PKR SWS NP, D = 3.1 11274' —12-7/8" X NP, D = 2.31' 11275' 4-12'PKR SWN NP, BEHIND MILLED D=3.80'(04/27/00) CT LNR 11284' 7-5/8"X5-12'HYDLNRw/T®KSLV,D=7 11288' 4-12' WLEG, D=3.958' 11286' ELMD TT LOGGED 07/12/91 11281' 3-12'XNP,1D=2.812' 11AM' 3-1/2'X3-3/16'_0=2788' MILLOUT WWDOW (P -04A) 11519'-1152T 13-1/4' X 2-7/8' XO. D = 2.377" 1 PRUDHOE BAY LUT WELL: PL04A PERMIT No: 218-116 AR N0: 50-029-22180-01 SEC 31, TI I N, R13E, 2564' FSL & 2001' FVYL DATE REV BY COMYBJTS DATE REV BY 00NIVENTS 07/12191 ALU2 INITIAL COMPLETION 0123/19 GJB/JM)SETLTPw/PMA&X-NP(O12211 06/03/00 NORDIC 1 SIDETRACKCOMPLETION 02/05/19 JN./JM1D TBG TALLY DEPTH EDITS 01/10/19 N-CDR2 CTD ST (P -04A) 01/15/19 .MRD DRLG HO CORRECTIONS 0123/19 TWJMT ODEFMWLAPFROVAL BP Exploration (Alaska) 0123/19 JRGJMJ GLV C/O (0121/19) North America - ALASKA- BP Operation Summary Report Common Well Name; P-04 AFE No Event Type. RE-ENTER- ONSHORE (RON) Start Date: 12/15/2018 End Date: 1/3/2019 X3 -0197J -C: (2,351,407.00 ) Project: PBU Site: P Page 1 of 30 1 Rig Name/No.: CDR -2 Spud Date/Time; 6/11/1991 12:00:OOAM Rig Release: Rig Contractor NABORS ALASKA DRILLING INC. BACKWARDS. 11-.30 BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) RIGU P r Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (Usft) 12/15/2018 11:00 - 1800 7.00 RIGU P PRE ACCEPT RIG AT 11:00. BEGIN SAFE OUT CHECKLISTS AND RIGGING INSPECT. UP. MAKE UP INJECTOR TO WELL. 14:30 - 1500 SPOT AUXILIARY EQUIPMENT. RIGU P PRE INSTALL QUICK CONNECT TEST FITTINGS. 1500 HOOK UP STEAM LINES AND INTERCONNECT 0.50 RIGU P PRE CONDUCT PJSM FOR REVERSE LINES. PREP ADAPTER FLANGE FOR TREE. 18.00 - 00'.00 6.00 RIGU P PRE PERFORM LTT BETWEEN MASTER VALVE SPOT AND HOOKUP MEOH. AND SWAB TO 3500#. GOOD TEST LINE UP VALVES FOR REVERSE NIPPLE DOWN TREE CAP. WORK ON CIRCULATING. 15:30 - 19:00 GETTING MPD LINE HOOKED UP. RIGU P PRE RECONFIGURE VALVES GOING TO TIGER LAND BOP STACK. NIPPLE UP STACK TANK TO MATCH HAZOP DRAWING LOADER SPOTTING CONTAINMENT AND ANY _ANCILLARY EQUIPMENT 12/16/2018 00:00 - 02:00 2.00 RIGU P PRE FINISH NIPPLE UP. SECURE STACK 3500 PSI, GOOD. 1900 - 00:00 5.00 RIGU 'TURNBUCKLES. 02:00 - 05:30 3.50 RIGU P PRE INSPECT TUGGERS. RUN ROPE THROUGH SLACK BACK TO REEL. INJECTOR. REVERSE CIRCULATE FRESH WATER INTO PULL GRAPPLE CABLE THROUGH. PJSM, REEL. REVIEW PROCEDURE AND DISCUSS ROLES AND RESPONSIBILITIES. JNSTALLGRAPPLE. PULLTEST 05:30 - 11:30 6.00 RIGU P PRE PULL CT ACROSS PIPE SHED AND INTO REPLACEDO-RING. PUMPSLACKBACK INJECTOR. FOR BULKHEAD. INSTALL HORSEHEAD. RIG UP BIG BOY COMPRESSOR TO BLOW REPLACE HOSE ON INJECTOR THAT WAS INNER REEL DOWN. LEAKING. INSTALL HOSE IN REEL FOR PUMPING SLACK Printed 1/28/2019 11:24:33AM **Ali depths reported in Drillers Depths" BACKWARDS. 11-.30 - 1430 3.00 RIGU P r PRE VALVE CHECKLISTAND RIG CHECKS WITH ONCOMING CREW. ENERGIZE BOPACCUMULATOR UNIT AND INSPECT. MAKE UP INJECTOR TO WELL. 14:30 - 1500 0.50 RIGU P PRE INSTALL QUICK CONNECT TEST FITTINGS. 1500 - 15:30 0.50 RIGU P PRE CONDUCT PJSM FOR REVERSE CIRCULATING. SPOT AND HOOKUP MEOH. LINE UP VALVES FOR REVERSE CIRCULATING. 15:30 - 19:00 3.50 RIGU P PRE RECONFIGURE VALVES GOING TO TIGER TANK TO MATCH HAZOP DRAWING PRESSURE TEST TIGER TANK LINE TO 250 / 3500 PSI, GOOD. 1900 - 00:00 5.00 RIGU P PRE PJSM FOR FILLING REELAND PUMPING SLACK BACK TO REEL. REVERSE CIRCULATE FRESH WATER INTO REEL. LEAK DEVELOPED ON RISER. BLOW DOWN AND INSPECT O-RING. REPLACEDO-RING. PUMPSLACKBACK FOR BULKHEAD. RIG UP BIG BOY COMPRESSOR TO BLOW INNER REEL DOWN. Printed 1/28/2019 11:24:33AM **Ali depths reported in Drillers Depths" Common Well Name: P-04 Event Type. RE-ENTER- ONSHORE (RON) Project: PBU North America -ALASKA - BP Operation Summary Report Start Date: 12/15/2018 End Date: 1/3/2019 Site: P AFE No (2,351,407.00) Page 2 of 30 Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _ lint (usft) 12/17/2018 00:00 - 01:00 1.00 RIGU P PRE BRING AIR ONLINE. FLOOR SUMPS NOT DRAINING. CREW MOBILIZED VACUUM SYSTEM. FRESHWATER TO CONTAINMENT IN CELLAR. CALL SPILL HOTLINE. CALL SUPERINTENDENT. FLOW LINE FROZE. HEAT TRACE NOT WORKING VERIFY TEST JOINT LENGTHS. TORQUE CONNECTIONS TO 1000# WHILE CLEANING 01:00 - 0400 3.00 RIGU P PRE _UP. CONTINUE BLOWING REEL DOWN. BLEED PRESSURE OFF. BREAK LINE OFF. TE -LINE FOR BULKHEAD. RACK BACK INJECTOR. 0400 - 0530 1.50 RIGU P PRE BREAK OFF DOWN TO TEST RISERS. INSTALL TEST CAP WITH JOINT GREASED -UP. 05.30 - 0830 3.00 RIGU P PRE 'CHECK BOPADAPTER FLANGE BOLTS FOR PROPER TORQUE. WITH SWEENEY. MAKE UP PRESSURE BULKHEAD AND J -BOX INSIDE REEL. MAKE UP INNER REEL HARDLINE. 08.30 - 1100 2.50 RIGU P PRE PJSM FOR CUTTING CT. HOOK UP HYDRAULIC CUTTER AND CUT 280' OF CT. 11:00 - 14:00 3.00 RIGU P r PRE INSTALL CT CONNECTOR, PULL TEST TO 50K, GOOD. COMPLETE VALVE CHECKLIST SHEET. LINE UP TO FILL REEL FORWARD. FILL REEL FORWARD. 1400 - 1500 1.00 RIGU P PRE PRESSURE TEST CT CONNECTOR AND PRESSURE BULKHEAD T04,700 PSI, SLIGHT LEAK OBSERVED. PERFORM LOBO ON REELAND TIGHTEN BULKHEAD PACKING. PRESSURE TESTT04,70_0 PSI, GOOD. 1500 - 16:00 1.00 RIGU P PRE RIG UP LITTLE JERKS FOR CALIBRATION. INSTALL CORRECT SIZE DIES. TORQUE UP STINGER AND NOZZLE WITH LITTLE JERKS AND TEST TORQUE VALUES. MAKE UP INJECTOR TO WELL. 16:00 - 1630 0.50 RIGU P PRE TEST QTS TO 250 / 3,500 PSI, GOOD. PUMP SLACK FORWARD AT 4,100 PSI 13.65 BPM. CABLE IS HEARD MOVING. 16:30 - 18:00 1.50 RIGU P PRE MOVE INJECTOR OFF WELL. _ _ _ _, _ CALIBRATE LITTLE JERKS, GOOD 18.00 - 2000 2.00 RIGU P PRE TEST WIRE. CONTINUITYGOOD. MEG TEST LOW. POSSIBLE MOISTURE CUT 20' COIL / 20'E -LINE. RETEST. SAME ISSUE. 2000 - 2230 2.50 RIGU P PRE PREP FOR SHELL TEST. WORKON SHELLTESTTO MAKE SURE WE ARE READY FOR A.M TEST PUMP ISSUES. _ CALL MECHANIC. 22:30 - 0000 1.50 RIGU P PRE CALLAND DISCUSS E -LINE ISSUES WITH ETL. CUT MORE COIL / E -LINE. Printed 1/282019 11:24:33AM **All depths reported in Drillers Depths" Common Well Name. P-04 Event Type: RE-ENTER- ONSHORE (RON) Project: PBU North America - ALASKA - BP Page 3 of 30 Operation Summary Report ATE No Start Date: 12/15/2018 End Date: 1/3/2019 X3 -0197J -C'. (2,351,407.00 ) Site: P Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum', KB @91.64usft (above Mean Sea Level) Date From - To Hra Task Code NPT Total Depth Phase Description of Operations (hr) (us@) 12/18/2018 00:00 - 02:30 2.50 RIGU P PRE CONTINUE TO TROUBLESHOOT E -LINE. OPEN JUNCTION BOX. GOOD TEST ON E -LINE. NARROW DOWN TO COLLECTOR OR COLLECTOR PIGTAIL. MECHANIC TORE DOWN TEST PUMP. SCALE PARTICLES HOLDING VALVES OFF SEAT. _ SERVICE TEST PUMP. _ 0230 - 0330 1.00 RIGU P PRE PJSM, REVIEW CROSSCHECK. STAGE UP PRESSURE TO ADJUST POPOFF AT 5500#. 8000# BURST DISK INSTALLED. PERFORM A PASSING 5100# SHELL TEST. BLOW DOWN TEST PUMP. 03'.30 - 0600 2.50 RIGU P PRE INSTALL COILTUBING CONNECTOR PULL TESTED TO 50K • BHI INSTALL LOC. TEST LINE FROM J -BOX TO UOC. TESTED GOOD. INSTALLTESTSUB. PRESSURETESTUOC AND CTC TO -4500#, GOOD. 0600 - 0800 2.00 BOPSUR P PRE MOVE CART BACK PREP FOR BOP TEST #1. CONDUCT PJSM FOR BOP TESTING. DRILLER AND WSL REVIEW PRESSURE XCHECK VERIFICATION. SIMOPS: REPLACE COLLECTOR THAT WAS THE SOURCE OF THE ELINE TROUBLE EARLIER. 08:00 - 12:00 4.00 BOPSUR N PRE TEST BOPS TO 25015000 PSI AS PER BP AND AOGCC REGULATIONS. TEST IS WITNESSED BYAOGCC REP JEFF JONES. TEST 1: BLINDS FAIL, CYCLEAND REPEAT, FAILAGAIN. FLUID IS OBSERVED PASSING BLINDS. CONTINUE ON WITH TEST 1. SIMOPS: CONTINUE WITH GAS ALARM TESTING, ALL GAS ALARMS PASS. PRESSURE STILL BLEEDING OFF, SUSPECT LEAKING PAST MASTER AND TWC. 1200 - 14:00 2.00 BOPSUR N PRE CALL OUT GREASE CREW. TEST NEW COLLECTOR, GOOD. MOVE FLUID AROUND PITS, CHECK PVT LO/ HI LEVELALARMS ON ALL THE PITS. GREASE CREW COMES OUT AND CLOSES SSV, SERVICES MASTER VALVE. 14'.00 - 16'.30 2.50 BOPSUR N PRE RE -START TEST #1 TO 250 / 5000 PSI. VALVE B4 1S LEAKING BYAT HIGH PRESSURE, GREASE AND CYCLE, RE -TEST. GET GOOD TEST ON B1, BL1. FAIL / PASS ON R1. FAIL ON 84 AND BLINDS. 1830 - 1800 1.50 BOPSUR N PRE TEST #2 ANNULAR (2-3/8"), TIW #2, B3, B2, BLi PASS 250 / 3500 PSI. 18:00 - 20:00 2.00 BOPSUR N PRE TEST #3 TO 250 / 5000 PSI. UPPER 2 3/8" PIPE/SLIP RAMS, TIW #2, BL2, T2 AND C 15. HIGH PRESSURE LEAK OFF TROUBLE SHOOT BY ISOLATION. REFLUSH TEST LINESAND RETEST. Printed 1/28/2019 11:24:33AM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name. P-04 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 1 2/1 512 01 8 Eno Date: 1/3/2019 X3 -0197J -C: (2,351,407.00 ) Project PBU Site: P Page 4 of 30 Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr)(usft) _ _..._ 20:00 - 23:00 3.00 BOPSUR N PRE RE -START TEST #3 TO 250/5000 PSI. UPPER 2 3/8" PIPE/SLIP RAMS, TIW #2, BL2, T2 AND C 15. ISOLATE LEAK PATHS ONE AT A TIME DOUBLE BLOCKING -PRESSURE STILL FALLING. CLOSE LOWER 2 3/8" PIPE/SLIP RAMS -PRESSURE STILL FALLING. TEST TEST EQUIPMENT -GOOD DISCUSS ISSUES WITH TOWN WHILE WAITING ON GREASE CREW TO ARRIVE -SUSPECT PRESSURE BLEEDING . PAST SSV _ 2300 - 2330 0.50 BOPSUR N PRE HOLD TOOLBOX TALK WITH GREASE CREW AND RIG CREW. CLOSE SWAB VALVE OPEN MASTER VALVE OPEN SSV -OBSERVED 200 PSI TRAPPED 'PRESSURE WHEN SSV OPENED. GREASE SWAB, SSV, MPD VALVES AND MASTER. 23:30 - 00:00 0.50 BOPSUR N PRE HOLD TOOLBOX TALK PRESSURE TEST TO 250 / 5000 PSI. AGAINST MASTER, LOWER 2 3/8" PIPE/SLIP RAMS, 71 -PRESSURE STILL BLEEDING OFF. NOTE -STATE INSPECTOR HOURED OUT WILL BE BACK IN 8 HOURS. _ 12119/2018 00:00 - 01:00 1.00 BOPSUR N PRE DISCUSS PLAN FORWARD WITH TOWN TEAM. HOLD TOOL BOX TALK WITH CREW PRESSURE TEST AGAINST TWC, LOWER2 3/8" PIPEISLIP RAMS, T1 TO 5000 PSI -PRESSURE STILL BLEEDING OFF AT 500 PSI IN 10 MINUTES PRESSURE TEST AGAINST TWC, LOWER2 3/8" PIPEISLIP RAMS, T1 TO 3500 PSI -PRESSURE STILL BLEEDING OFF 150 PSI IN 10 MINUTES DISCUSS RESULTS WITH TOWN TEAM AFTER REACHING AGREED UPON STOP POINT. 01:00 - 0230 1.50 BOPSUR N PRE HOLD TOOLBOX TALK WITH CREW PRESSURE TEST VOID BETWEEN SSVAND SWAB VALVE USING THE MPD LINE TO 250/3500 PSI.GOOD TEST DISCUSS RESULTS AND PLAN FORWARD WITH TOWN TEAM 02'.30 - 0800 5.50 BOPSUR N PRE HOLD TOOLBOX TALK WITH CREW REMOVE TEST JOINT DE ENERGIZE AND LOCK OUT ACCUMULATOR VAC OUT BOP STACK TO REMOVE FLUID. CHANGE OUT BLIND RAMS ELEMENTS. 08:00 - 10:00 2.00 BOPSUR N PRE CHANGE OUT CHOKE HCR. 10:00 - 12:30 2.50 BOPSUR N PRE REPLACEMENT COMPLETED. ENERGIZE ACCUMULATOR. COMPLETE VALVE CHECKLIST SHEET. CONDUCT SHELL TEST ON BOPS, SWAB, CHOKE AND KILL HCCRS TO 25015000 PSI, GOOD 1230 - 18:00 5.50 BOPSUR N PRE WAITONAOGCCINSPECTORTOARRIVE- SHIM REEL. Printer! 1/28/2019 11:24:33AM "All depths reported in Drillers Depths" 2300 - 0000 North America - ALASKA - Blo Pape 5 of 30 N PRE Operation Summary Report Common Well Name: P-04 AFE No Event Type: RE-ENTER- ONSHORE (RON) Stan Date: 12/15/2018 End Date. 1/3/2019 X3 -0197J -C'. (2.351,407.00 ) Project: PBU Site: P Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:00:OOAM Rig Release. Rig Contractor: NABORSALASKA DRILLING INC. BPUOI'. USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) TEST CHOKE VALVE C11 AGAINST C15 12/20/2018 00:00 Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ TESTCHOKE MANIFOLD TO 25015000 PSI (usft) 1800 - 1900 1.00 BOPSUR N PRE TEST SOPS TO 250 / 5000 PSI AS PER BP AND WHILE WAITING ON VALVE CREW TO ARRIVE AOGCC REGULATIONS. TEST IS WITNESSED BYAOGCC REP MATT HERRERA. TEST CHOKE VALVE C9,C7 AND C10 AGAINST TEST 1: BLINDS FAIL, CYCLE AND REPEAT, FAILAGAIN. FLUID IS OBSERVED PASSING C15 -FOUND TEST HOSE QUICK CONNECT TO BLINDS. 1900 - 19:30 0.50 BOPSUR N PRE TEST #2: ANNULAR (2-3/8"), TIW #1 , 83, B2, BE LEAKING. -NO TEST -REPAIR HOSE 01:30 02:00 PASS 250 / 3500 PSI. 19.30 - 2000 0.50 BOPSUR N PRE TEST #3 TO 250/5000 PSI. UPPER 2 318" PIPE/SLIP RAMS, TIW #1 , B3, B2. -TO OBTAIN HOLD TOOL BOX TALK WITH GREASE CREW 5000 PSI TEST ON TIW #1, 83, B2 _ 2000 - 21:00 1.00 BOPSUR N PRE TEST #4 TO 250 / 5000 PSI. UPPER 2 3/8" OPEN MASTER, OPEN SSV, OPEN MPD LINE PIPEISLIP RAMS, TIW #2, B2 AND C 15. R2 FAILED -ISOLATED WITH B2 21:00 - 23:00 2.00 BOPSUR N PRE TEST #5 TO 25015000 PSI. UPPER 2 3/8" PIPE/SLIP RAMS, TIW #2, BL2 R2 AND B4. B4 APPEARS TO BE LEAKING, FUNCTION, SERVICES TREE VALVES GREASE AND RETEST UPPER 2 3/8" PIPE/SLIP RAMS, TIW #2, 81 AND B4 AND R2 CLOSE TR EE VALVES. 02:00 NOT HOLDING.84 FAIL. 1.50 BOPSUR N NOTE: WENT BACK TO LAST GOOD TEST FLUSH LINES AND TEST AGAINST SWAB ALLIGNMENT, NOT ABLE TO OBTAIN PASSING TEST. SUSPECT PRODUCTION TREE VALVES NOT HOLDING. 3/8" PIPE/SLIP RAMS, TIW #1 , B3, B2 -NOT CALL VALVE CREW TO COME SERVICE TREE VALVES. ABLE TO MAINTAIN A GOOD TEST SUSPECT NOTE: AOGCC REP MATT HERRERA TIMED OUT AND LEFT LOCATION WITH PERMISSION FLUID PASSING BY PRODUCTION TREE TO CARRY ON WITH TESTING ONCE TROUBLE SHOOTING IS DONE WITHOUT 0330 - 0400 0.50 WITNESS 2300 - 0000 1.00 BOPSUR N PRE TEST CHOKE MANIFOLD TO 250/5000 PSI WHILE WAITING ON VALVE CREW TO ARRIVE ON LOCATION. TEST CHOKE VALVE C11 AGAINST C15 12/20/2018 00:00 - 01:30 1.50 BOPSUR N PRE TESTCHOKE MANIFOLD TO 25015000 PSI WHILE WAITING ON VALVE CREW TO ARRIVE ON LOCATION. TEST CHOKE VALVE C9,C7 AND C10 AGAINST C15 -FOUND TEST HOSE QUICK CONNECT TO BE LEAKING. -NO TEST -REPAIR HOSE 01:30 02:00 0.50 BOPSUR N PRE GREASE PRODUCTION TREE VALVES HOLD TOOL BOX TALK WITH GREASE CREW OPEN MASTER, OPEN SSV, OPEN MPD LINE TO BLEED ANY TRAPPED PRESSURE, OPEN SWAB. SERVICES TREE VALVES CLOSE TR EE VALVES. 02:00 - 03:30 1.50 BOPSUR N PRE FLUSH LINES AND TEST AGAINST SWAB VALVE TO 250 / 5000 PSI. AGAINST UPPER 2 3/8" PIPE/SLIP RAMS, TIW #1 , B3, B2 -NOT ABLE TO MAINTAIN A GOOD TEST SUSPECT FLUID PASSING BY PRODUCTION TREE VALVES. 0330 - 0400 0.50 BOPSUR N PRE DISCUSS OPTIONS AND PLAN FORWARD WITH CTD SUPT AND ETL Printed 1/28/2019 11 24:33AM "All depths reported in Drillers Depths" Common Well Name: P-04 Event Type: RE -ENTER -ONSHORE (RON) Project: PBU Rio Name/No.: CDR -2 North America - ALASKA - BP Operation Summary Report Start Date. 12/15/2018 End Date: 1/3/2019 Site: P Spud Daterrime: 6/11/1991 12:00:OOAM Active datum: KB (091.64usft (above Mean Sea Level) Dale From -To Him Task (hr) 04:00 - 06:30 2.50 BOPSUR Code NPT Total Depth (usft) N 06:30 - 08:30 2.00 BOPSUR N 08.30 - 1200'. 3.50 BOPSUR N 12'.00 16:00 4.00 BOPSUR N i 16:00 - 19:30 3.50 BOPSUR N Page 6 of 30 AFE No X3 -0197J -C'. (2,351,407.00 ) BPUOI: USA00001646 Phase Description of Operations .— PRE RIG UP TO PUMP PREMIUM GREASE INTO MASTER, SWAB AND SSV, EXPEDITE ADDITIONAL DRUM OF PREMIUM GREASE TO RIG SITE. DISCUSS PLAN FORWARD WITH NABORS SUPERINTENDENT, PREPARE LOCK OUTAND PRE JOB FOR TESTING BOPS WITH 3500 PSI TRAPPED PRESSURE BETWEEN SWAB AND SSV.PUMP PREMIUM GREASE INTO MASTER, SWAB_ANDSSV PRE PJSM FOR NEW SHELL TEST. PUT 3500 PSI ON THE WELL IN BETWEEN THE SWAB AND SSV. PRESSURE BLEEDING OFF, REPLACE 2 VALVES AND TRV AGAIN. STILL BLEEDING OFF, FLUID IS OBSERVED PASSING THE SWAB. PRE REGREASE SWAB VALVE. PRESSURE UP BETWEEN SWABAND CLOSED SSV, MASTER. PRESSURE IS BLEEDING OFF. PRESSURE UP BETWEEN SWAB AND TWC. PRESSURE IS BLEEDING OFF, SAME RATE AS BEFORE. CLOSE MASTER VALVE AND SEE IF LINE FLATTENS OUT. STILL BLEEDING OFF. PRE DISCUSS PLAN FORWARD WITH ODE, CTD SUPT AND ETL. DECISION IS MADE TO USE BOP TEST PLUG THAT SITS IN A SPOOL ON THE BOTTOM OF THE BOPS. CHANGE OUT SEALS ON BLIND RAMS. PRE PJSM THEN BREAKAPART STACK TO INSTALL BOP TEST SPOOL. BREAK FLANGE AND REMOVE BOPS FROM PRODUCTION TREE INSTALL TESTING SPOOL WITH PRE LOADED TEST PLUG ON TOP OF PRODUCTION TREE RE INSTALL BOP ONTO TESTING SPOOL.. GREASE CHOKE VALVES AND B VALVE _ OFFLINE t 19:30 - 20:00 0.50 BOPSUR N PRE FUNCTION BLINDS, FLUID PACK TEST LINES. 20:00 - 21:45 1.75 BOPSUR N IR HOLD PJSM AND SHELL TEST BOPS TO 250/5000 PSI -FAIL LEAKING THROUGH BLINDS. RIG UP TEST JOINT WITH CAP AND RE ATTEMPT SHELL TEST TO 250/5000 PSI Printed 1/28/2019 11 24 **All depths reported in Drillers Depths" AGAINST TEST CAP, R2, TIW 2, TEST PLUG, TP2, C15 AND BL 2 -GOOD TEST. CALL MATT HERRERA AOGCC REPAND RECIEVE PERMISSION TO START BOP TEST. 21.45 - 22.15 050 SOPSUR P PRE TEST BOPS TO 250/ 5000 PSI AS PER BP AND AOGCC REGULATIONS. TEST IS WITNESSED BY AOGCC REP MATT HERRERA. TEST #1: ANNULAR (2-3/8"), TIW #2, B3, B2, 250/3500 PSI. -PASS 22:15 - 2300 075 BOPSUR P PRE TEST#2: UPR23/8 PIPE/SLIP RAMS, TIW#2, 33,132, 250 / 5000 PSI. -PASS 23:00 - 23:30 0.50 BOPSUR P PRE TEST #3 UPR 2 3/8 PIPE/SLIP RAMS, TIW #2, BL2, R2, 250 / 5000 PSI. -PASS Printed 1/28/2019 11 24 **All depths reported in Drillers Depths" Common Well Name: P-04 Event Type: RE-ENTER- ONSHORE(RON) Project: PBU North America - ALASKA - BP Page 7 of 30 Operation Summary Report Start Date: 12/15/2018 Site: P End Date: 1/3/2019 AFE No K3 -0197J -C:(2,351,407.00) Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) 0445 - 0515 0.50 Date From - To Him Task Code NPT Total Depth Phase Description of Operations 0.75 BOPSUR (hr) PRE _ (usft) 2330 - 0000 0.50 BOPSUR P PRE TEST #4 UPR 23/8 PIPE/SLIP RAMS, TIW#2, 3.00 BOPSUR P PRE PJSM THEN RIG UP FOR TESTING IRV AND C16, C11, _B1 250 / 5000 PSI. -PASS 12/21/2018 00:00 - 0030 0.50 BOPSUR P PRE TEST BOPS TO 250 / 5000 PSI AS PER BPAND INSTALL NOZZLE, MAKE UP RISER TO WELL. AOGCC REGULATIONS. PUMP I REEL VOLUME FORWARD. 09:00 TEST IS WITNESSED BYAOGCC REP MATT 2.00 BOPSUR P PRE CREW CHANGE. HERRERA. RIG CHECKS AND VALVE CHECKLIST WITH TEST #5 TEST 2 3/8 X 3 1/2 VBR, C7, Ce, C10, NEW CREW. TB2 TO 250/5000 PSI -PASS 0030 - 01:00 0.50 BOPSUR P PRE TEST #6 TEST LOWER 2 3/8 PIPE SLIP RAMS, PRESSURE TEST INNER REEL VALVE, -05, CS C8, TVI -PASS 01:00 - 01:30 0.50 BOPSUR P PRE TEST #7SUPER AND MANUAL CHOKES. 1.00 BOPSUR N PRE VALVE R3 IS SEEN LEAKING FROM THE FACE 2500 PSI DRAWDOWN -CHOKE IN GOOD FLANGE. OPERATION 01:30 - 0200 0.50 BOPSUR P PRE ACCUMULATOR DRAWDOWN TEST RESULT. CLOSING PRESSURE 2375, TIME TO GAIN 200 CHANGE OUT VALVE R3. PSI 17 SECONDS, FULL PRESSURE 64 SECONDS. AVERAGE NITROGEN 10 BOTTLES AT 2100 PSI. GOOD TEST. 02:00 - 0230 0.50 BOPSUR P PRE RIG UP TO TEST VARIABLES AND ANNULAR WITH 3 1/2" PIPE -HAD TO REMOVE BOTTOM OF TEST JOINT FOR SPACE OUTAGAINST THE TEST PLUG 02:30 - 03:00 0.50 BOPSUR P PRE TEST #6 ANNULAR WITH 31/2 PIPE, Cl, C4, C6, TIW 2 TO 250/3500 PSI -PASS OFFLINE TEST PVT SYSTEM AND ALARMS. 03:00 - 03:30 0.50 BOPSUR P PRE TEST #9 VBRS WITH 3 1/2 PIPE Cl, C4, C6 TIW 2 TO 250/5000 PSI -PASS 0330 - 04:00 0.50 BOPSUR P PRE TEST #10 C2, C3, B3, TO 250/5000 PSI -PASS 0400 - 0445 0.75 BOPSUR P PRE TEST#11 84, BOTO 250/5000 PSI SUSPECT - CHECK VALVE LEAKING, ISOLATE AND TEST Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths" B4 TO 250/5000 PSI -PASS 0445 - 0515 0.50 BOPSUR P PRE TEST#12 BL1A, R1 TO 250/5000 PSI -PASS 05:15 - 0600 0.75 BOPSUR P PRE RIG DOWN TEST JOINTAND TEST .EQUIPMENT _ 06:00 - 0900 3.00 BOPSUR P PRE PJSM THEN RIG UP FOR TESTING IRV AND STRIPPER. INSTALL NOZZLE, MAKE UP RISER TO WELL. PUMP I REEL VOLUME FORWARD. 09:00 - 11:00 2.00 BOPSUR P PRE CREW CHANGE. RIG CHECKS AND VALVE CHECKLIST WITH NEW CREW. PJSM FOR PT INNER REEL VALVE. PRESSURE TEST INNER REEL VALVE, STRIPPER TO 250 / 3,500 PSI. 11.00 - 1200 1.00 BOPSUR N PRE VALVE R3 IS SEEN LEAKING FROM THE FACE FLANGE. BLEED OFF PRESSURE AND TIGHTEN, SAME RESULT. CHANGE OUT VALVE R3. Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths" North America - ALASKA - Blo Operation Summary Report Common Well Name: P-04 BPUOI: USA00001646 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2018 Project: PBU Site: P End Dale: 1/3/2019 AFE No X3 -0197J -C (2,351,407 00 ) Page 8 of 30 Rig Contractor NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB C91.64usft (above Mean Sea Level) BOPSUR N Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) just) BOPSUR N 12:00 - 15:00 3.00 BOPSUR P PRE LINE UP TO PRESSURE C9, C10 FROM 1.50 DOWNSTREAM SIDE. PRESSURE 25013,500 PSI. PRESSURE IS BLEEDING OFF, DRIP OBSERVED FROM BEHIND C9, C10. GREASEAND CYCLE THESE 2 VALVES, TRY AGAIN. STILL BLEEDING, ISOLATE IRVAND STRIPPER AND TEST THOSE. GOOD TEST TO 250 / 3500 PSI ON IRV AND STRIPPER 1500 - 1945 4.75 BOPSUR N 19:45 - 20:45 1.00 BOPSUR P 20:45 - 21:45 1.00 BOPSUR P 21:45 - 2200 0.25 BOPSUR P 2200 - 0000 2.00 BOPSUR N 12/22/2018 00:00 - 01:00 1.00 BOPSUR N 01:00 - 01:30 0.50 BOPSUR N 01:30 - 03:00 1.50 BOPSUR P 03:00 - 04:00 1.00 BOPSUR N VALVE C9 NOT HOLDING PRESSURE FROM THE DOWNSTREAM SIDE. PRE PJSM FOR CHANGING OUT BLIND RAM SEALS. PERFORM LEAK TIGHT TEST ON SWAB AND SSV, GOOD. CHANGE OUT SEALS ON BLIND RAM BLOCKS, CHANGE OUT EQUALIZER VALVE ON BLIND RAM OPERATORS.. PRE TEST BLINDS TO 250/5000 PSI -GOOD PERFORM SHELL TEST TO TEST BLIND RAM DOOR SEALS TO 250/5000 PSI -GOOD PRE TEST BOPS TO 25015000 PSI AS PER BP AND AOGCC REGULATIONS. TEST IS WITNESSED BYAOGCC REP MATT HERRERA. TEST #14 BLINDS, B1, B2, B3 TO 250/5000 _ PSI -PASS _ PRE TEST # 15 B2, BLINDS, C9, C10, C16, C6, TP 1, TP 2 250/5000 PSI -FAIL C9 LEAKING SERVICE AND CYCLE C9, RESTEST 250/5000 PSI 1 PRE TEST #16 CHOKE TEST CHOKE AAND CHOKE C PRESSURE UP TO 5000 PSI HOLD, OPEN CHOKES BLEED TO 2500 PSI AND HOLD -GOOD TEST PRE LINE UP TO PRESSURE C9, of 0 FROM DOWNSTREAM SIDE. FLUSH AND FILL LINES PRESSURE 25013,500 PSI. DID NOT PASS SIMOPS CREW CHANGE SIM OPS RIG UP GREASE CREW TO GREASE PRODUCTION TREE VALVES. PRE RIG DOWN RISER AND FLANGE FROM TOP OF ANNULAR WITH PJSM REMOVE TEST PLUG FROM TESTING SPOOL. PRE RIG UP RISER TO TOP OFANNULAR AND MU SAME. PRE PURGE AND FLUSH SURFACE LINES FOR TESTING LINE UP TO TEST BL1 TO 250/3500 PSI -PASS LINE UP TO TEST T2 TO 250/3500 PSI -PASS LINE UP TO TEST T1 TO 250/3500 PSI -PASS NOTE RISER WAS TESTED WITH EACH OF THE ABOVE TESTS PRE LINE UP TO PRESSURE C9, of 0 FROM DOWNSTREAM SIDE. PRESSURE 25013,500 PSI. UNABLE TO MEET PASSING CRITERIA Printed 1/26/2019 11 24:33AM **All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name. P-04 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 12/15/2018 Eno Date. 113/2019 X3 -0197J -C: (2,351,407.00 ) PBU Site: P Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Hrs Task Code (hr) 04:00 - 04:30 0.50 BOPSUR N 04:30 - 06:30 2.00 BOPSUR N 06:30 - 07:30 1.00 BOPSUR P 07:30 - 09:30 2.00 BOPSUR N Rig Release: NPT Total Depth Phase Description of Operations (usft) 0930 - 1000 0.50 BOPSUR P 10:00 - 12:30 2.50 BOPSUR P Page 9 of 30 PRE REBUILD VALVE C13 FLUSH/PURGE LINES _ LINE UP FOR TEST OF VALVES C9 AND C10 PRE LINE UP TO PRESSURE C9, C10 C13 FROM 'DOWNSTREAM SIDE. PRESSURE 250 / 3,500 PSLUNABLE TO MEET PASSING CRITERIA. TROUBLE SHOOT LEAK PATH. REPLACE SEAT ON C13, PRE PRESSURE UP ON DOWNSTREAM SIDE OF C9, C10. GOOD TEST. BOP TESTING COMPLETE. PRE DURING TESTING, C14 WAS PASSING FLUID. PJSM THEN CHANGE OUT C14. 'TRY TO TEST C14, NOTABLE TO. SUSPECT C13 AND CHOKE PASSING FLUID. PJSM THEN CHANGE OUT C13. TESTC13,C14AFTER CHANGEOUT,_ GOOD. PRE RIG EVAC EXERCISE WITH MICAH'S CREW. ,ALL PERSONS MUSTER AND ACCOUNTED FOR IN 3 MIN. _ 'CONDUCTAAR. PRE GREASE CHOKE AND FUNCTION. INSTALL BHI FLOATS. GREASE ALL CHOKE VALVES POST BOP TEST. RIG CHECKS AND VALVE CHECKLIST WITH ONCOMING CREW. 12:30 - 14:00 1.50 BOPSUR P PRE PRESSURE TEST UQC TO 250/4700 PSI, GOOD. PRESSURE TEST FLOATS TO 3,500 PSI, GOOD. 14:00 - 1530 1.50 1 BOPSUR P PRE MAKE UP INJECTOR TO WELL. CHECK TREE BOLTS FOR TORQUE. PUMP THROUGH MPD CHOKE AND VERIFY PLC CONTROLLER IS WORKING. 15:30 - 16.00 0.50 BOPSUR P PRE RIG EVAC EXERCISE WITH RICK ROY CREW. ALL PERSONS MUSTER AND ACCOUNTED FOR IN 4 MIN. CONDUCTAAR. 1600 - 1800 2.00 WHSUR P PRE GET NEW RKBS WITH NABORS CREWAND VALVE SHOP CREW. HOOK UP BPV LUBRICATOR AND PULLING RODS. _ HOOK UP HYDRAULICS. _ 18.00 - 1930'. 1.50 WHSUR P PRE HOLD PJSM WITH RIG CREWAND VALVE SHOP CREW FOR TESTING LUBRICATOR AND PULLING BPV. WALK ALL LINES AND VERIFY VALVE ALLIGNMENT FLUSH LINES TO CLEAR AIR FOR TEST. PRESSURE TEST VALVE LUBRICATOR TO 250/5000 PSI FOR 5 MINUTES EACH -GOOD TEST. Printed 1/28/2019 11:24.33AM **All depths reported in Drillers Depths" Common Well Name: P-04 Event Type: RE-ENTER- ONSHORE(RON) Project: PBU - North America - ALASKA- BP Operation Summary Report Start Date'. 12/15/2018 Site: P AFE No End Date'. 1/3/2019 X3 -0197J -C (2,351 407 00 ) Page 10 of 30 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datumKB @91.64usft (above Mean Sea Level) 1.00 Date From - To Hos Task Code NPT Total Depth Phase Description of Operations (hr) (usft) - 0030 19:30 - 2045 1.25 WHSUR P PRE PULL TWC HOLD PJSM RIG DOWN TEST LINE, RIG UP LUBRICATOR HYDRAULIC LINE. OPEN MASTER VALVE OPEN SSV OPEN SWAB AND MONITOR FOR TRAPPED PRESSURE -0 PSI VERIFY LINE UP PER NABORS PROCEDURE USING COMMAND AND CONTROL CHECKLIST. ENGAGE AND PULL TWC. WELL ON SLIGHT VAC -ALLOW METHANOL TO DRAIN. CLOSE MASTER AND SWAB VALVE NOTE: FUSABLE CAP INSTALLED AND HYD _ FLUID DRAINED FOR SSV. 20:45 - 21:00 0.25 WHSUR P PRE PERFORM LEAK TIGHT TEST TO 3500 PSI BETWEEN MASTER AND SWAB -GOOD TEST WITNESSED BY RIG MANAGER AND WSL. 21'.00 - 21:30 0.50 21:30 23:00 1.50 WHSUR P i PRE RIG DOWN LUBRICATOR KILLW P 'HOLD PJSM OPEN NEEDLE VALVE ON LUBRICATOR AND VERIFY NO METHANOL PRESENT. BREAK OTIS CAP AND PULL LUBRICATOR WITH TWC. LAY DOWN AND RIG DOWN LUBRICATOR. _ BLOW DOWN LINE TO TIGER TANK. PRE MAKE UP BHA#1 FOR BOTTOM KILL OPERATION HOLD PJSM WITH CREW. MAKE UP STINGER, NOZZLE WITH FLOAT INSTALL QUICK TEST CONNECTOR TO LUBRICATOR STAB INJECTOR TEST QUICK TEST CONNECTOR AND LUBRICATOR TO 3500 PSI LEAK TIGHT TEST. GOOD TEST PRE LOAD COIL TUBING WITH METHANOL AND HEATED 1% KCL PUMP 15 BBLS OF METHANOL FOLLOWED BY HEATED 1% KCL TAKING RETURNS TO TIGER TANK UNTIL METHANOL IS DETECTEDAT OUT MICROMOTION. _ PRE LOAD COIL TUBING WITH METHANOLAND HEATED 1% KCL 8.5 PPG PUMP 15 BBLS OF METHANOL FOLLOWED BY HEATED 1% KCL TAKING RETURNS TO TIGER TANK UNTIL METHANOL IS DETECTEDAT OUT MICROMOTION. Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths" 23:00 - 00:00 1.00 KILLW P 12/23/2018 0000 - 0030 0.50 KILLW P 'HOLD PJSM OPEN NEEDLE VALVE ON LUBRICATOR AND VERIFY NO METHANOL PRESENT. BREAK OTIS CAP AND PULL LUBRICATOR WITH TWC. LAY DOWN AND RIG DOWN LUBRICATOR. _ BLOW DOWN LINE TO TIGER TANK. PRE MAKE UP BHA#1 FOR BOTTOM KILL OPERATION HOLD PJSM WITH CREW. MAKE UP STINGER, NOZZLE WITH FLOAT INSTALL QUICK TEST CONNECTOR TO LUBRICATOR STAB INJECTOR TEST QUICK TEST CONNECTOR AND LUBRICATOR TO 3500 PSI LEAK TIGHT TEST. GOOD TEST PRE LOAD COIL TUBING WITH METHANOL AND HEATED 1% KCL PUMP 15 BBLS OF METHANOL FOLLOWED BY HEATED 1% KCL TAKING RETURNS TO TIGER TANK UNTIL METHANOL IS DETECTEDAT OUT MICROMOTION. _ PRE LOAD COIL TUBING WITH METHANOLAND HEATED 1% KCL 8.5 PPG PUMP 15 BBLS OF METHANOL FOLLOWED BY HEATED 1% KCL TAKING RETURNS TO TIGER TANK UNTIL METHANOL IS DETECTEDAT OUT MICROMOTION. Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths" Continued from day shift. T/1/0= 0/0/0 Post CDR2. Barriers MV & SV. Verified by performing independent LTT. Macnical issues with truck. Job on hold. Job Continued on 111012019 1/11/2019 T/1/0=0/010 POST CDR2. Continued from 1110/2019. R/U CIW Lubricator 840 W/ 4" H plug and tool. PT'd lubricator Low 300psi, High 3500psi. Set TWC # 296 @ 125 top of window. Good set. R/D lubricator & swapped over to pulling tool & R/U lubricator. Torqued Tree with no movement on any studs. PT'd Tree low 300psi, Hight 5000psi. (Passed). Pulled TWC # 296 @ 125 top of window. Installed tree cap & PTd to 500psi. RDMO 1/11/2019 ***Job Complete*** FWHP= 0/0/0 ***WELL FOUND S/1 ON ARRIVAL*** DRIFTED TO DEVIATION @ 11,615' SLM w/ 2.51" CENT, AND 1.75" S-BLR. RAN PDS JEWELRY LOG FROM 11,350' SLM TO SURFACE. 1/20/2019 ***WSR CONTINUED ON 1/21/19*** T/I/0= Vac/Vac/Vac Temp= S/I Assist SSL (CTD) Pumped 14 bbis crude down TBG, 1/21/2019 ***WSR Continued on 01-22-19*** ***WSR CONTINUED FROM 1/20/19*** (ctd) SET4-1/2" WHIDDON CATCHERAT 11245' SLM. PULLED STA#4 BK-DGLV FROM 6765' MD PULLED STA#5 BK-DGLV FROM 3110' MD SET STA#5 BK-LGLV AT 3110' MD. SET STA#4 BK-DGLV AT 6765' MD. PULLED 4-1/2" WHIDDON CATCHER FROM 11245' SLM. RAN DUMMY 3.70" 45 KB LNR TOP PKR, 2' SPACER PUP, DMY PTSA TO 11,270' MD. (Unable to get full penetration) RAN 4-1/2" BRUSH TO BRUSH LTP @ 11,270MD. RAN DUMMY 3.70" 45 KB LNR TOP PKR, 2' SPACER PUP, DMY PTSA TO 11,270' MD. (Unable to get full penetration) RAN 4-1/2" BRUSH TO BRUSH LTP @ 11,270' MD WHILE PUMPING. 1/21/2019 ***WSR CONTINUED ON 1/22119*** *"WSR CONTINUED FROM 1/21/19`** (ctd) SUCCESSFUL DRIFT TO 11237' SLM W/ 3.70" LTP DRIFT, SET 45 KS LNR TOP PACKER W/ 2' SPACER PUP, AND PTSA AT 11237' SLM. (TOP @ 11261' MD) LRS MIT -T TO 2160 PSI (PASS). PULL 2-7/8" XX PLUG FROM LTP AT 11237' SLM. (11274' md) 1/22/2019 ***WELL TURNED OVER TO DSO*** ***WSR Continued from 01-21-19*** Temp= S/I Assist SSL MIT -T ***PASS*** @ 2311. Max applied 2400, target 2160. Pumped 5 bbis crude down TBG to assist SSL. Pumped 4.92 bbis to reach test pressure. 1st 15 min lost 54 psi. 2nd 15 min lost 25 psi. Total loss 1/22/2019 of 79 psi. Bled back —1.9 bbis. Hang tags. FWHP's 290/0/0. SLB on well upon departure. Printed 1/282019 11 24 33A *`All depths reported in Drillers Depths" North America - ALASKA - BP Page 11 or 30 Operation Summary Report Common Well Name. P-04 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date: 12/15/2018 Eno Date. 113/2019 X3-0197J-C: (2,351 407.00 ) Project: PBU Site: P Rig Name/No.: CDR-2 Spud Date/Time: 6/11/1991 12:00 OOAM Rig Release: Rig Contractor NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB Q91.64usft (above Mean Sea Level) Date From -To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 00:30 - 06:00 5.50 _ KILLW P 11.491 00 PRE RIH FROM SURFACE TO 11491' HOLD PJSM WITH RIG CREW-ALSO COVER PRE SPUD SLIDE PACK WITH CREW OPEN WELL TO CLOSED CHOKE-0 PSI ON WELLHEAD SET OPERATING PRESSURE ON CHOKE TO MAINTAIN 100 PSI WELL HEAD PRESSURE. RIH AT 50 FPM PUMPING AT 0.25 BPM WITH HEATED I%KCL8.5 PPG UNTILPASSING PERMAFROST AT 2300'. NO WELL HEAD PRESSURE INCREASE OBSERVED WHILE RIH AND PUMPING. FILL DOWN BACK SIDE. APPROXIMATELY 5 BELS TO FILL. INCREASE RUNNING SPEED TO 80 FPM CONTINUING TO HOLD 100 PSI ON CHOKE. NOTE: PULL BACK TO SURFACE FROM 100' TO RE CALIBRATE BHI DEPTH COUNTER. STOP AGAIN AT 10000' TO FINISH CALIBRATION. NOTE: STOP AT 200 BBLS SHIPPED OUT TO TIGER TANK AND CONFIRM WITH MANUAL STRAP. TT SENSOR MATCHES MANUAL :STRAP. 06.00 - 0740 167 KILLW P 11,491.00 PRE LIGHT TAG ON WHIPSTOCK AT 11.491' UNCORRECTED. PICK UP 10' AND INCREASE PUMP RATE TO BPM. PUMPALL KCL WATER THEN SHUT DOWN. HAVEN'T GOT A BOTTOMS UP YET SO S/I WELLAT CHOKE WHILE TT IS EMPTIED OUT. RESUME PUMPING A FULL B/U. _ 07.40 - 08:20 0.67 KILLW P 0.00 PRE AFTER e/U SUIT DOWN PUMP. PJSM AND REVIEW NABORS PROCEDURE TO PURGE ANY TRAPPED GAS OUT OF CT RISER. HOOK UP BLEED HOSE FROM RISER OUT TO TT, PUMP FLUID OUT TO TT. UNHOOK HOSEAND PURGE WITH AIR FROM RIG FLOOR. 08:20 - 10.30 2.17 KILLW P 11,491.00 PRE CONTINUE CIRCULATING MUD TO NOZZLE. AFTER MUDAROUND NOZZLE, START POOH. AFTER MUD GETS TO SURFACE, BRING RETURNS INSIDE, PURGE TIGER TANK LINE WITH AIR. FLOW CHECK WELL. RETURN FLOW DIMINISHING SLOWLY. USE 16 OZ CONTAINER TO FINGERPRINT WELL. 1ST 16 OZ - 2.5 MIN TO FILL 2ND -5MIN 3RD- 15 MIN FLOW HAS STOPPED AFTER 15 MORE MIN. _ 10 MIN FLOWCHECK IS GOOD. _ 10:30 - 14:20 3.83 KILLW P 11,491.00 PRE CONTINUE POOH. TAG STRIPPER AND RUN BACK IN 500' TO GET CORRECT DEPTH COEFFICIENT FOR _ BHI. 14:20 - 15:30 1.17 KILLW P 11,491.00 PRE TAG STRIPPER. PJSM WITH NABORSAND BHI CREW FOR LID BHA. UD NOZZLE BHA. MAKE UP TIW TO SAFETY JOINT. Printed 1/282019 11 24 33A *`All depths reported in Drillers Depths" Common Well Name. P-04 Event Type: RE-ENTER- ONSHORE(RON) Project: PBU North America - ALASKA - BP Page 12 of 301 Operation Summary Report Start Date: 12/15/2018 E,d Date. 1/3/2019 Site:P -- Soud Date/Time: 6/11/1991 12:00:OOAM AFE No X3 -0197J -C (2,351407.00) Rig Contractor: NABORSALASKA DRILLING INC. BPUOI. USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) Wait) 15:30 - 17:30 2.00 STWHIP P 11,491.00 WEXIT PJSM THEN M/U BHA#2, WINDOW MILL. WHILE PICKING UP BHA WALK THROUGH SAFETY JOINT PROCEDURE WITH NEW CREW MEMBERS. MILLAND REAMER BOTH 3.80 GO, 3.79" NO-GO _ 17.30 - 2000 2.50 STWHIP P 11,491 00 WEXIT RIH WITH BHA#2 TO 11390' PERFORM GAMMA RAY TIE IN -10' CORRECTION CONTINUE TO RIH FROM 11 390'AND DRY TAG WHIPSTOCK 2000 - 2030 0.50 STWHIP P 11,51900 WEXIT CONTINUE RIH AND DRY TAG 11518.5'WITH 2.8K DOWN. _ 20:30 - 00:00 3.50 STWHIP P 11,521.00 WEXIT ,MILL 3.80" WINDOW IN S-1/2"X75/8"DUAL STRING PER BAKER REP FROM 11518.5' - RATE: 2.85 BPM IN, 2.85 BPM OUT - MUD WEIGHT: 8.6 PPG IN, 8.58 PPG OUT -SEE MOTOR WORK AT 11518.5 SUSPECTED CEMENT -START MILLING WINDOWAT 11519.3'TO 11521.5 - DWOB: 0. 3.2KLBS - CIRC PRESSURE:2480-2550 PSI _ 12/24/2018 00:00 - 013:00 6.00 STWHIP P 11,526 50 WEXIT MILL 3.80" WINDOW IN 5-1/2"X 7 5/8" DUAL STRING PER BAKER REP - RATE: 2.8 BPM IN, 2.8 BPM OUT - MUD WEIGHT: 8.59 PPG IN, 8.54 PPG OUT -SEE MOTOR WORK AT 11518.5 SUSPECTED CEMENT -START MILLING WINDOW AT 11521.5' TO 11526.5' - DWOB: 3- 3.5KLBS - CIRC PRESSURE:2480-2550 PSI 06:00 - 12:00 6.00 STWHIP P 11,526.50 WEXIT MILL 3.80" WINDOW IN 5-1/2'X 7 5/8" DUAL STRING PER BAKER REP FROM 11525.3' MD TO 11526.9' MD - RATE: 2.74 BPM IN, 2.73 BPM OUT - MUD WEIGHT: 8.58 PPG IN, 8.54 PPG OUT - DWOB: 3.4 - 3.8 KLBS - CIRC PRESSURE: 2500 - 2650 PSI - GETTING GOOD AMOUNT OF METAL ACROSS SHAKER. 12:00 - 16:30 4.50 STWHIP P 11,529.60 WEXIT MILL 3.80"WINDOW IN S-1/2"X75/8"DUAL STRING PER BAKER REP FROM 11526.9' MD TO 11529' BOW MD - RATE: 2.76 BPM IN, 2.77 BPM OUT - MUD WEIGHT: 8.58 PPG IN, 6.54 PPG OUT - DWOB: 3.4 - 3.8 KLBS - CIRC PRESSURE: 2500 - 2650 PSI AT 11527.5 PUMP 10 BELS LO / HI VIS SWEEPSAROUND. -APPEAR TO HAVE EXITED CASING AT 11529' BASED ON MILLING PARAMETERS. PUMP UP A SAMPLE FROM THAT DEPTH. -SAMPLE AT 11529' CONFIRMED TO HAVE SHUBLIK FORMATION Printed 1/28/2019 11:24:33AM '"All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Common Well Name. P-04 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2018 Pmiect PBU Site: P AFE No End Date: 113/2019 X3 -0197J -C.(2,351,407 00 I Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 1200 00AM Rig Release: Page 13 of 30 Rig Contractor: NABORSALASKA DRILLING INC. - 0000 2.25 BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) 11,539.00 WEXIT POOH FROM 11515' TO 900' Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) Usti)_ -OPEN EDC, POOH. _ 1830 - 2000 3.50 STWHIP P 11,539.00 WEXIT MILL 10' RATHOLE PER PROGRAM FROM BOW 11 529'TO 11539' 12/25/2018 0000 - 01:00 1.00 - RATE: 2.84 BPM IN, 2.94 BPM OUT P 11,539.00 WEXIT - MUD WEIGHT: 8.59 PPG IN, 8.54 PPG OUT - DWOB: 3.4 - 3.8 KLBS - CIRC PRESSURE: 2500 - 2650 PSI 2000 - 2145 175 STWHIP P 11,539.00 WEXIT PERFORM 3 REAMING PASSES AT VPER MINUTE FROM 11539' -11515' -PASS 1 ATAS MILLED TFO-CLEAN -PASS 2 AT 15 DEGREES LEFT OF AS MILLED 101:00 - 02:30 1.50 TFO-CLEAN P 11,539.00 WEXIT -PASS 3 AT 15 DEGREES RIGHT OF AS MILLED TFO-CLEAN -PUMP SBBL HI VIS SWEEP OUT OF THE BIT ON PASS 3 AND ABOVE EDC PRIOR TO DRY DRIFT. -DRY DRIFTAT 20' PER MINUTE -CLEAN -DYNAMIC FLOW CHECK AT 1 BPM ABOVE WINDOW FOR 10 MINUTES-OABBLS LOSS 21:45 - 0000 2.25 STWHIP P 11,539.00 WEXIT POOH FROM 11515' TO 900' -OPEN EDC, POOH. 'PUMP 3_.5 _BPM /2,_700 PSI. 12/25/2018 0000 - 01:00 1.00 STWHIP P 11,539.00 WEXIT POCH FROM 900' TO 236' PERFORM .05 HOUR FLOW CHECK -GOOD HOLD PJSM WITH CREW ON UPCOMING BHA SWAP 101:00 - 02:30 1.50 STWHIP P 11,539.00 WEXIT LD BHA#2 - POOH FROM 238'-132' CHECK COIL CONDITION -GOOD - BREAK INJECTOR OFF WELL - LD BHA #2 NOTE 3.79" NO GO ON MILL 3.78" NO GOON REAMER _ _ _ 02:30 - 03:30 1.00 DRILL P 11,539.00 PROD1 MU BHA#3 - BHA MADE UP ON PREVIOUS TRIP OUT OF HOLE AND STOOD BACK - RUN BHA INTO STACK AND MU TO INJECTOR - MAKE INJECTOR ONTO LUBRICATOR - TEST CONNECTION AT QUICK TEST SUB TO 3500 PSI_ 03:30 - 07:00 3.50 DRILL P 11,539.00 PROD? RIH WITH 4.25° BHA#3 BUILD BHA TO 9700' - RATE: 0.50 BPM IN, 0.50 BPM OUT. CIRC PRESSURE: 890 PSI -MUD WEIGHT: 8.56 PPG IN, 8.53 PPG OUT PVT: 253 BELS -TIE-IN DEPTH, CORRECT -7 FT. - CLOSE EDC. - PASS THROUGH WINDOW WITH NO PUMP, OL TF, 10 FT/MIN WITH NO ISSUES. -TAG BOTTOM LIGHTLY, PICK UPAND TURN ON PUMPS. 07:00 - 12:00 5.00 DRILL P 11,635.98 PRODt DRILL 4.25' BUILD FROM 11,538'MD 7O 11,636' MD (8885' TVD) - FREE SPIN: 2936 PSI, 2.70 BPM - RATE: 2.70 BPM IN, 2.73 BPM OUT. CIRC PRESSURE: 2989-3097 PSI - MUD WEIGHT: 8.57 PPG IN, 8.61 PPG OUT, ECD: 10.14 PPG - ROP: 17.4 FT/HR, WOB: 2.5 —3.7 KLBS Printed 1/28/2019 11:24:33AM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 14 of 30 Common Well Name. P-04 AFE No Event Type: RE-ENTER- ONSHORE (RON) Stan Date: 12115/2018 End Date'. 1/3/2019 X3 -0197J -C: (2,351,407 00 ) Project: PBU Site: P Rig Name/No.: CDR -2 Spud Date/time: 6/11/1991 12:00:OOAM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) .___ 1200 - 1330 1.50 DRILL P 11,635.98 PROD? POOH FOR LOG TO IDENTIFY JEWELRY -JOG IN OPEN HOLE -OPEN EDC AND BRING UP PUMP RATE TO CLEAR BHA OF CUTTINGS -TIE-IN DEPTH, CORRECT+1 FT. - RIH AND CLOSE EDC - LOG WHILE RIH F/ 11,300' T/ 11,380.19 -RIH T/11,500' - LOG F/ 11,500' T/ 11,562' RA MARKER AT 11,526' _ _- RIH _T/11,636' _ 13:30 - 18:00 4.50 DRILL P 11,733.00 PRODt DRILL 4.25" BUILD FROM 11,636'MD 7011733' MD (8874' TVD) - FREE SPIN: 2969 PSI, 2.74 BPM - RATE: 2.73 BPM IN, 2.78 BPM OUT. CIRC PRESSURE: 2988-3002 PSI - MUD WEIGHT: 8.57 PPG IN, 8.61 PPG OUT, ECD: 10.14 PPG - ROP: 21.55 FT/HR, WOB: 2.33-2.67 KLBS 1800 - 0000 6.00 DRILL P 11,773.00 PROD1 DRILL 4.25" BUILD FROM 11,733' MD TO 11773' MD (8878' TVD) - FREE SPIN: 2969 PSI, 2.74 BPM - RATE: 2.89 BPM IN, 2.94 BPM OUT. CIRC PRESSURE: 2988 - 3002 PSI - MUD WEIGHT: 8.57 PPG IN, 8.61 PPG OUT, ECD: 10.14 PPG -ROP: 6.6 FT/HR, WOB: 2-4 KLBS 12/26/2018 00:00 - 01:30 1.50 DRILL P 1178600 PROD1 DRILL 4.25" BUILD FROM 11,773'MD 7011786' MD (8878' TVD) - FREE SPIN: 2969 PSI, 2.74 BPM - RATE: 2.89 BPM IN, 2.94 BPM OUT. CIRC PRESSURE: 2988-3002 PSI - MUD WEIGHT: 8.57 PPG IN, 8.61 PPG OUT, ECD: 10.14 PPG ROP: 8.7 FT/HR, WOB: 2-4 KLBS 01:30 - 05:00 3.50 DRILL P 11,786.00 PROD1 POOH FROM 11 786'TO SURFACE -LAST SURVEY CAME BACKAT A41 DEGREE DOGLEG AND SLOW ROP. DECIDE TO POOH, REDUCE MOTOR BEND AND CHECK BHA -PUMP 5 BBL LOW VIS SWEEP FOLLOWED BY A 5 BBL HI VIS SWEEP. -POOH TO WINDOW -REDUCE PUMP RATE TO .3 BPM PULLING THROUGH WINDOW -PULL THROUGH WINDOW AT 0 DEGREES -OPEN EDC AND PERFORM DYNAMIC FLOW CHECK FOR 10 MINUTES -1 BBL LOSS -POOH PUMP 3.8 BPM/3300 PSI HOLDING 10.1 PPG EM W AT WINDOW FOR THE TRIP. NOTE: SWEEPS BRING BACK 40% EXCESS CUTTINGS. Printed 112812019 11:24:33AM **All depths reported in Drillers Depths" North Amenca - ALASKA - BP Page 15 of 30 Operation Summary Report Common Well Name. P-04 AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date: 12/15/2018 End Date: 1/3/2019 X3 -0197J -C'. (2,351 407.00 ) Project: PBU Site: P Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr)_ _ (usft) 05:00 - 07:00 2.00 DRILL P 11,78800 PROD? MONITOR WELL FOR 10 MINUTES AT BHA: STATIC -CLOSE EDC, POWER DOWN - INJECTOR OFF: 05:20 INSPECT LAST 50'OF CT FOR CHROME ABRASION, NOTHING SEEN. BIT IS 5-1 MAKE UP 4.25' BUILD DRILLING BHA#4 -PICKUP 2-7/8" ULS MOTOR (2.7 DEG AKO) AND 3" COILTRAK TOOLS - MAKE UP 3.75" X 4.25" HYC BICENTER BIT WITH DURAFORCE CUTTERS AND TORQUE CONTROLBUTTONS - SURFACE TESTED COILTRAK TOOL. GOOD TEST. - PRESSURE TEST QTS TO 3,500 PSI HIGH FOR 5 MINUTES, GOOD '-INJECTOR ON: 07:00 0700 - 11:30 4.50 DRILL P 11786.00 PROD1 RIH WITH 4.25" BUILD DRILLING BHA#4 - RATE: 0.48 BPM IN, 0.51 BPM OUT. CIRC PRESSURE: 1364 PSI '- MUD WEIGHT: 8.52 PPG IN, 8.53 PPG OUT -ADHERE TO PRESSURE SCHEDULE KEEPING ECD AT 10.21PPG EMW WEGHT CHECKAT 11,392' WITH 47K UP AND 23K DOWN - LOG GR TIE IN, -13 FT CORRECTION - CONTINUE RIH - CLOSE EDC @ 11,500' - RIH AND SAT DOWN 7K AT 11,520 -ATTEMPTED FOUR TIMES WITH SAME RESULTS AT+1- 20 FPM WITH TF 0° - PICK UP 20' AND START PUMPS AT .3 BPM WITH 1361 PSI AND RIH AT 5FPM WITH TF AT 0° - ATTEMPT TO ENTER WINDOW TWICE AND SAT DOWN 2K AND 3K - DISCUSS WITH ODE AND ETL - PUMP AT .3 BPM W/ 1361 PSI AND OREINT TF TO 15° RIGHT AND RIH, SAT DOWN 2K AND OBSERVED NO DECREASE IN WOB AFTER 5 MINUTES Printed 1/282019 11:24:33AM **All depths reported in Drillers Depths" Common Well Name: P-04 Event Type: RE-ENTER- ONSHORE(RON) Project: PBU North America - ALASKA- BP Operation Summary Report AFE No Start Date: 12/15/2016 End Date. 1/3/2019 X3 -0197J -C: (2,351,407.00 ) Site: P Page 18 of 30 Rig Name/No.: CDR -2 Spud Datemme: 6/1111991 12:00 ROAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64us8 (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Descnption of Operations (hr) (usd) 11:30 - 1530 4.00 _ _ DRILL N 11,786.00 PROD? POOH WITH 4.25" BUILD DRILLING BHA#4 -ADHERING TO PRESSURE SCHEDULE TO MAINTAIN 10.21PPG EMW ECD - OPEN EDC AND POOH TO 11,479' - DYNAMIC FLOW CHECK, NO FLOW - POOH AT 90 FPM 3.72 IN, 3.31 OUT W/ 3180 PSI - TRIP SHOWING 1/2 BBL GAIN - DYNAMIC FLOW CHECK AT 7239' 1.431N, 1.47 OUT, NO FLOW - PUMP AT 2.37 1N, 2.02 OUT WITH 416 PSI AND CONT POOH - FLOW CHECK WITH PUMPS OFF THROUGH WHITEY VALVE ON LUBRICATOR AT 136', GOOD NO FLOW CHECK -POP INJECTOR OFF AND INSPECT 80' OF COIL, NO ABNORMALTIES OBSERVED '- UNSTAB COILAND STAND BACK BUILD BHA #4 - BIT IS BALLED UP WITH SHUBLIK FORMATION _ 1530 - 1900 3.50 DRILL N 11,786.00 PROD1 i RIH WITH CLEAN OUT ASSEMBLY '- PICK UP PRE -ASSEMBLED MILL BHA # 5 - STAB COILAND TEST QTS. GOOD TEST - OPEN EDC AND TEST MWD, GOOD TEST -RIH WITH 3.78" MILLASSEMBLYAT 90 FPM, 1.00 BBL IN, 1.44 BBL OUT, 1095 PSI PUMP PRESSURE FROM SURFACE TO 11330' TIE IN AT 11330' -16.5- -CLOSE EDC, GET PARAMETERS: UP WT 46K, DN Wr 22K, 2850 PSI AT 2.8 BPM. -RIH FROM 11330' TO 11500' 19:00 - 21:30 2.50 DRILL N 11,786.00 PROD? CLEAN OUT WINDOW - PARAMETERS UP WT 461 DN WT 22K, 2850 PSI AT 2.8 BPM. -RIH FROM 11 500'TO 11 539'CLEAN AT 3 FPM -MAX DIFF ON MOTOR 70 PSI NO WEIGHT, -PULL UP THROUGH WINDOW CLEAN. -RIH FROM 11500' TO 11 539'CLEAN AT 5 FPM -MAX OFF ON MOTOR 50 PSI NO WEIGHT, -PULL UP THROUGH WINDOW CLEAN. -DRY DRIFT WINDOW CLEAN -PUMP 10 BBL LOW VIS, 10 BBL HI VIS SWEEP TO SURFACE WHILE CONTINUING TO WORK FROM 11280'70 TOP OF WINDOWAT 11518, FOLLOW WITH SECOND 5 BBL LOW VIS, 5 BBL HI VIS SWEEP TIMED TO BEAT BIT WITH FIRST SWEEP OUT OF THE HOLE. NO INCREASE IN CUTTINGS WITH 1ST SWEEP AT SHAKERS. -DRY DRIFT WINDOW FINAL- CLEAN -POOH TO 11505' OPEN EDC -PERFORM DYNAMIC FLOW CHECK FOR 10 MINUTES- 0.9 BBL LOSS NOTE: NO INCREASE IN CUTTING OBSERVED WITH EITHER SWEEP. Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths" North America - ALASKA- BP Operation Summary Report Common Well Name: P-04 Event Type: RE-ENTER- ONSHORE (RON) Stan Date. 12/15/2018 Project: PBU Site: P Rig Name/No.: CDR -2 Spud DateTme: 6/11/1991 Rig Contractor: NABORSALASKA DRILLING INC. 11505' TO 700' Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Him Task Code NPT (hr) 21:30 - 00:00 2.50 DRILL N 12/27/2018 0000 - 0030 0.50 DRILL N 0030 01:30 1.00 DRILL N 01:30 - 0430 3.00 DRILL N 0430 - 0600 1.50 DRILL P 0600 - 17:30 11.50 DRILL P End Date: 1/3/2019 12:00:OOAM AFE No K3 -0197J -C: (2,351,407.00 ) Rig Release: Page 17 of 30 Total Depth Phase Description of Operations (usft) -DISCONNECT INJECTOR FROM LUBRICATOR 11,786.00 PRODI POOH WITH CLEANOUT ASSEMBLY FROM 11505' TO 700' POOH PUMPING AT 3.5 BPM FOLLOWING ECD SCHEDULE TO HOLD 10APPG EMWAT WINDOW. 11,786.00 PROD1 POOH WITH CLEANOUT ASSEMBLY FROM700' 11,786.00 j TO SURFACE' -POOH PUMPING AT 3.5 BPM FOLLOWING ECD SCHEDULE TO HOLD 10.IPPG EMW AT WINDOW. -JOG BACK IN HOLE TO 500' -POH BACK TO SURFACE. -FLOW CHECK AT SURFACE -STATIC, HOLD PJSM FOR BHA OPERATIONS DURING FLOW CHECK 11,786.00 PROD1 'CHANGE OUT BHA -DISCONNECT INJECTOR FROM LUBRICATOR -BREAK OUTAND STAND BACK CLEANOUT BHA -RUN BUILD BHA IN HOLE -MAKE UP BUILD BHATO INJECTOR -MAKE UP INJECTOR TO LUBRICATOR _ _ _-TEST OTS TO 3500PSI. GOOD _ 11,786.00 j PROD1 . RIH WITH 4.25" BUILD DRILLING BHA#4 - RATE: 0.48 BPM IN, 0.51 BPM OUT. CIRC PRESSURE: 1364 PSI - MUD WEIGHT: 8.63 PPG IN, 8.63 PPG OUT -ADHERE TO PRESSURE SCHEDULE KEEPING ECD AT 10.21 PPG EM W - WEGHT CHECK AT 11,392' WITH 48K UP AND 22K DOWN - LOG GR TIE IN, -17 FT CORRECTION - CONTINUE RIH - CLOSE EDC @ 11,500- 1,500'-PASSTHROUGH -PASS THROUGHWINDOW CLEAN SEE 5K REDUCTION IN DWOB AT 11580' -WORK PAST AREA I TIME CLEAN. -CONT RIH TO 11750', BRING PUMPS UP TO _ 2.9 BPM AT 3250 PSI,48KUPAND22KDOWN 11,820.00 PROW DRILL 4.25" BUILD FROM 11,786'MD TO 11820' MD (8883' TVD) - FREE SPIN: 3250 PSI, 2.9 BPM - RATE: 2.90 BPM IN, 3.0 BPM OUT. CIRC PRESSURE: 3320 - 3340 PSI - MUD WEIGHT: 8.69 PPG IN, 8.63 PPG OUT, ECD: 10.21 PPG - ROP: 22.6 FT/HR, WOB: 2-3.5 KLBS 11,930.00 PROD1 DRILL 4.25' BUILD FROM 11,820' MD 7O 11930' MD (8893' TVD) - FREE SPIN: 3250 PSI, 2.7 BPM - RATE: 2.59 BPM IN, 2.89 BPM OUT. CIRC PRESSURE: 3320 - 3380 PSI - MUD WEIGHT: 8.69 PPG IN, 8.63 PPG OUT, ECD: 10.21 PPG - ROP: 9.6 FT/HR, WOB: 3-4 KLBS Printed 1/2811019 11:24:33AM **All depths reported in Drillers Depths" Common Waif Name. P-04 Event Type: RE-ENTER- ONSHORE(RON) North America - ALASKA - BP Page 18 of 30 Operation Summary Report Start Date. 12/15/2018 End Date. 1/3/2019 AFE No K3 -0197J -C'. (2,351,407.00 ) Project: PBU Site: P Rig Name/No.: CDR -2 Spud Dale/Time: 6/11/1991 12:00:OOAM Rig Release: Active datum: KB @91.64usft (abc Date From - To 17:30 - 21:15 21:15 - 00:00 12/28/2018 0000 - 01:00 Mean Sea Hrs (hr) 3.75 Task DRILL Code NPT Total Depth Phase Description of Operations (usfi N 11,930.00 PROD1 POOH FOR TOOL FAILURE -LOWER HALF OF 2.75 DRILL IN 1.00 DRILL N 01:00 - 01:30 0.50 01:30 - 0200 0.50 0200 - 0330 03:30 04:15 1.50 DRILL N DRILL P DRILL P 0.75 DRILL N Printed 1128/2019 1124.33AM **All depths reported in Drillers Depths" COILTRAK TOOL -PUMP 10 BBL LO VIS & 10 BBL HI VIS SWEEP PULL TO WINDOW WHILE CHASING SWEEP. -WORK THROUGH TIGHT SPOT AT 11645' WORK THROUGH -8K WOB -PULL THROUGH WINDOW WITH PUMPS OFF, WORK THROUGH TIGHT SPOT AT BOTTOM OF WINDOW 11534' LIMITING OVERPULL TO 4K CAME THROUGH ON 4 ATTEMPT. -PUMP 5 BBL LO VIS & 5 BBL HI VIS SWEEP TIMED TO BEAT 11515 WHEN SWEEP REACHES BIT. -CHASE SWEEP TO 11300', JOG BACK IN HOLE TO 11515' OPEN EDC. -PUMP SWEEP TO SURFACE AT 4 BPM -000 INCREASE IN CUTTINGS OBSERVED AT SURFACE. -PUMP AN ADDITIONAL 10 BBL HI VIS & 10 BBL LO VIS SWEEP WHILE PERFORMING DYNAMIC FLOW CHECK. ONCE SWEEP IS OUT EDC POOH CHASING SWEEP. 11,930.00 PROD? POOH WITH BUILD ASSEMBLY FROM 11515 TO SURFACE -POOH PUMPING AT 3.5 BPM FOLLOWING ECD SCHEDULE TO HOLD 10.1 PPG EMW AT WINDOW. -JOG BACK IN HOLE TO 500' TWICE DUE TOA HIGH AMOUNT OF SHALE CUTTINGS COMING OVER SHAKERS._ 11,930.00 PROD? POOH WITH BUILD ASSEMBLY FROM 500' TO SURFACE -POOH PUMPING AT 3.5 BPM FOLLOWING ECD SCHEDULE TO HOLD 10.1 PPG EMW AT WINDOW. -CONTINUE TO JOG BACK IN HOLE TO 500' DUE TO A HIGH AMOUNT OF SHALE CUTTINGS COMING OVER SHAKERS. -POH BACK TO SURFACE. -FLOW CHECKAT SURFACE -STATIC. HOLD PJSM FOR BHA OPERATIONS DURING FLOW CHECK 12,125.00 PROD1 CHANGE OUT BHA -DISCONNECT INJECTOR FROM LUBRICATOR -BREAK OUT AND STAND BACK BUILD BHA -LAYDOWN MOTOR AND BIT-INSPECTAND CHANGE 3-1 11,930.00 PROD1 FUNCTION TEST BOPS FROM DRILLERS PANEL. -TESTANNULAR, 2 3/8" PIPE SLIPS X 2,2 3/8" X 3 1/2" VARIABLES, BLINDS AND HI ALL FUNCTIONS GOOD 11,930.00 PROD1 INSTALL FLOATS IN UQC CHANGE OUT STRIPPER PACKER TEST 70250/3500 PSI FOR 5 MINUTES EACH -GOOD TEST 11,930.00 PROD1 MAKE UP BHA -RUN BUILD BHA IN HOLE -MAKE UP BUILD BHATO INJECTOR -MAKE UP INJECTORTO LUBRICATOR Printed 1128/2019 1124.33AM **All depths reported in Drillers Depths" -PUMPING AT VARIOUS RATES TO MAINTAIN A 10.6 EMW AT THE SHOE. -SLOW DOWN TO 60 FPM POOH SPEED BETWEEN 8600' AND 3600' FOR BETTER HOLE CLEANING IN DEVIATED HOLE. AT 1250' FEET MPD CHOKE STARTS TO CLOG WITH SHALES. SWITCH OFF OF MPD CHOKE AND RESUME PUMPING. RBIH TO 2250'. CLEAR MPD CHOKE AND CONTINUE OUT OF HOLE ON MPD CHOKE. -JOG BACK IN HOLE TO 500' FROM SURFACE -PERFORM 10 MINUTE FLOW CHECK PRIOR TO HAVING BHA IN BOPS Printed 1/28/2019 1124:33AM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 19 or 30 Operation Summary Report Common Well Name: P-04 AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date: 12/15/2018 Eod Date. 1/3/2019 X3 -0197J -C: (2,351,407.00 ) -Project: PBU Site: P Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:00 OOAM Rig Release'. Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001M Active datum: KB ®91.64usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (ho __. _ (usft) 0415 - 0930 5.25 DRILL N 11,930.00 PROD1 RIH WITH 4.25" BUILD DRILLING BHA#7 - RATE: 0.30 BPM IN, 0.70 BPM OUT. CIRC PRESSURE: 1641 PSI - MUD WEIGHT: 8.69 PPG IN, 8.69 PPG OUT -ADHERE TO PRESSURE SCHEDULE KEEPING ECDAT 10.21PPG EMW -TIE INTO GAMMA WITH A-20' CORRECTION '- APROACH WINDOWAT HIGH CENTER AND OBSERVED BIT ROLL TO 5° LEFT WITH I BOBBLE - RIH PUMPING AT.3 BPM AND SAT DOWN AT 11,570' AFTER 3 ATTEMPTS WITH PUMPS AT .5 BPM INCREASE PUMP RATE TO 1 BPM AND PASSED THROUGH ON 4TH ATTEMPT - CONTINUE RIH AND SAT DOWN AT 11,617' AND WORKED THROUGH ON 4TH ATTEMPT - CONTINUE RIH AND TAKE CHECK SHOT SURVEY. GOOD 0930 - 2045 11.25 _ DRILL P 12,125.00 PROD? DRILL4.25"BUILD FROM 11,930'MDTO 12125' MD(8918'TVD) - FREE SPIN: 3099 PSI, 2.63 BPM - RATE: 2.63-2.84 BPM IN, 2.69-2.87 BPM OUT. CIRC PRESSURE: 3114-3397 PSI - MUD WEIGHT: 8.63 PPG IN, 8.67 PPG OUT, ECD: 10.49 PPG WITH OPEN CHOKE -PUMP 10 BBL LO VIS X 10 BBL HI VIS SWEEP AT 3 BPM AT 11930' AND 11980' ROP: 17.3.3 FT/HR, WOB. 3-5 KLBS 20 45 - 0090 3.25 DRILL P 12,125.00 PROD1 POOH -PUMP 10 BBL LO VIS X 10 BBL HI VIS SWEEP AT 3 BPM -POOH TO 11499 -PUMPING AT 0.3 BPM WHILE BIT IS CROSSING WINDOW TRAY. -PUMP SECOND 10 BBL LO VIS X 10 BBL HI VIS SWEEP TIMED TO BE AT BIT WHEN ABOVE WINDOW -SHUT OFF PUMPS AND OPEN EDC -JET TO BOTTOM OF TRAY THROUGH OPEN EDC AT 4 BPM AT 3662 PSI -CHASE SWEEP TO 11300' -RUN BACK IN HOLE TO 11510' -DISPLACE HOLE TO 9.8 PPG 12/29/2018 00:00 - 00:15 0.25 DRILL P 12,125.00 PROD1 PERFORM DYNAMIC FLOW CHECKAT 1 _ BPM -1.5 BBL LOSS 0015 - 0345 3.50 DRILL P 12,125.00 PROD1 POOH FROM 11 300'TO SURFACE -PUMPING AT VARIOUS RATES TO MAINTAIN A 10.6 EMW AT THE SHOE. -SLOW DOWN TO 60 FPM POOH SPEED BETWEEN 8600' AND 3600' FOR BETTER HOLE CLEANING IN DEVIATED HOLE. AT 1250' FEET MPD CHOKE STARTS TO CLOG WITH SHALES. SWITCH OFF OF MPD CHOKE AND RESUME PUMPING. RBIH TO 2250'. CLEAR MPD CHOKE AND CONTINUE OUT OF HOLE ON MPD CHOKE. -JOG BACK IN HOLE TO 500' FROM SURFACE -PERFORM 10 MINUTE FLOW CHECK PRIOR TO HAVING BHA IN BOPS Printed 1/28/2019 1124:33AM **All depths reported in Drillers Depths" Printed 1/28/2019 11:24:33AM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 20 of 30 Operation Summary Report Common Well Name. P-04 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 1211512018 End Date. 1/3/2019 X3 -0197J -C(2, 351407.00) Project: PBU _ Site: P -- - - Rig Name/No.: CDR -2 Spud Date/rime: 6/11/1991 12:00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64usR (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (110 (usft) 03:45 - 04:30 0.75 DRILL P 12,125.00 PROD1 CHANGEOUTBHA -DISCONNECT INJECTOR FROM LUBRICATOR -BREAK OUTAND STAND BACK BUILD BHA -LAYDOWN MOTOR AND BIT-INSPECT/CHANGE BIT AND CHANGE MOTOR ANGLE TO 1.15 DEGREES -RUN DRILLING BHA IN HOLE -MAKE UP BUILD BHA TO INJECTOR -MAKE UP INJECTOR TO LUBRICATOR -TEST QTS TO 3500PSI. GOOD NOTE: HELD KICK WHILE TRIPPING DRILL WITH RIG CREW WITH -BHA OUT OF HOLE._ 04:30 - 05:00 0.50 DRILL P li 12,125.00 PROD? RIH WITH 4.25" LATERAL BHA#8 -CLOSE EDC AND PUMP AT.3 BPM WITH 1239 PSI .-PUW 47K, SOW 20KAT 11,475' -ORIENT TOOL FACE TO HIGH CENTER AND j PASS THROUGH WINDOW WITH NO PROBLEM -CONTINUE IN HOLE F/ 11,529 T/ 12,125' AT 25 FPM, .32 BPM, 1242 PSI 05:00 - 08:00 3.00 DRILL P 12,125.00 PROD1 RIH WITH LATERAL 4.25" DRILLING BHA#8T/ 11,360' -OPEN EDC AND RIH MAINTAINING ECDAT 10.5EMW 08:00 - 08:30 0.50 DRILL P 12,125.00 PRODt PERFORM CCL LOG -LOG GAMMA RAY TIE IN -22.5' CORRECTION -POOH T/ 11,250' AND LOG DOWN T/ 11,400' -SEND RESULTS OF CCL LOG TO ODE 08:30 - 16:30 8.00 DRILL P 12,125.00 PROD? DISPLACE WELLABOVE WINDOW -PUMP 30 BBL SPACER AND DISPLACE 9.8PPG KILL WEIGHT FLUID FROM WELL -DISPLACE NEW 8.6 PPG QUIKDRIL-N 16:30 - 17:00 0.50 DRILL P 12,125.00 PROD1 RIH WITH 4.25" LATERAL DRILLING ASSEMBLY F/ 11,400'T/ 12,125' -OBTAIN PARAMETERS AT 11,475' PUW 47K, SOW 20K -ORIENT TOOL FACE TO H IGH CENTER AND PUMP AT .32 BPM W/ 1232 PSI -PASS THROUGH WINDOW 7FPM WITH NOTHING SEEN -CONTINUE RIH AT 25FPM PUMPING AT .3 BPM WITH 1300 PSI 1700 - 1815 1.25 DRILL P 12,200.00 PROD1 DRILL 4.25" LATERAL FROM 12,125' MD TO 12200' MD (8931' TVD) - FREE SPIN: 3400 PSI, 2.86 BPM - RATE: 2.87 BPM IN, 2.98 BPM OUT. CIRC PRESSURE: 3530 — 3700 PSI - MUD WEIGHT: 8.65 PPG IN, 8.58 PPG OUT, ECD: 10.12 PPG - ROP: 50 FT/HR, WOB: 3.5-4 KLBS NOTE: TEMPORARILY DETAINED AT 12200', 1815 - 1915 1.00 DRILL N 12,200.00 PRODi WORKING BHA FREE AT 12200', PULL THREE TIME AT 30K OVER STRING WT. CONTINUED TO CIRC AT 2 BPM WHILE MOVING CUTTINGS UP HOLE WITH 20 K OVER STRING WT. COIL CAME FREE. -WIPER TRIP WITH LO/HI VIS 5BBL SWEEP FROM 12200'-11960; Printed 1/28/2019 11:24:33AM "All depths reported in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 21 of 30 Common Well Name. P-04 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 12/15/2018 End Date: 1/3/2019 X3 -0197J -C: (2,351.407 00 ) Project: PBU Site: P Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:0000AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64us6 (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Desuiptlon of Operations (hr) _ _ Milt) 19:15 - 19:30 0.25 DRILL P 12,209.00 PROD1 DRILL 4.25°LATERAL FROM 12,200'MD TO 12209' MD (8932' TVD) - FREE SPIN: 3400 PSI, 2.86 BPM - RATE: 2.87 BPM IN, 2.98 BPM OUT. CIRC PRESSURE: 3530 — 3700 PSI -WIPER TRIP WITH LO/HI VIS SBBL SWEEP FROM 12200'-11960; - MUD WEIGHT: 8.65 PPG IN, 8.58 PPG OUT, ECD: 10.12 PPG - ROP: 50 FT/HR, WOB: 3.5-4 KLBS NOTE: TEMPORARILY DETAINED AT 12209', 1930. - 0090 4.50 DRILL P 12,209.00 PROD1 STUCKAT 12209', PULLTHREE TIME AT 30K OVER STRING WT. -SHUT DOWN PUMP WITH NEUTRAL STRING WMEGHT FOR 20 MINUTES. -ATTEMPT TO PULL FREE WITH 30K OVER STRING WEIGHT, STILL DETAINED -HOLD PJSM WITH CREW FOR PUMPING MINERAL OIL. -PUMP 10 BBL KCL SPACER, 20BBLS MINERAL OIL, 10BBL SPACER. -SPOT 10 BBLS ON MINERAL OIL IN ANNULUS, SOAK FOR 20 MINUTES ATTEMPT TO PULL TO 30 K OVER STRING WEIGHT NO IMPROVEMENT. -WORK PIPE FROM NEUTRAL WEIGHT TO 30K OVER WITH NO IMPROVEMENT. SPOTAN ADDITIONAL S BBLS ON OUTSIDE OF PIPE FOR 15 BBLS TOTALAND SOAK FOR 20 MINUTES.ATTEMPT TO PULL TO 30 K OVER STRING WEIGHT NO IMPROVEMENT. -SPOT AN ADDITIONAL 5 BBLS ON OUTSIDE OF PIPE FOR 20 BBLS TOTALAND SOAK FOR 20 MINUTES.ATTEMPT TO PULL TO 30 K OVER STRING WEIGHT NO IMPROVEMENT -WORK PIPE FROM NEUTRAL WEIGHT TO 30K OVER WITH NO IMPROVEMENT. NOTE CALL FOR CRUDE TANKER -BEING SENT TO SLB FOR TESTING. 12/30/2018 00:00 - 00'.30 0.50 DRILL N 12,209.00 PROD? STUCK AT 12209', -WORK PIPE FROM NEUTRAL WEIGHT TO 30K OVER WITH NO IMPROVEMENT. 00:30 - 0200'. 1.50 DRILL N 12,209.00 PROD1 CIRCULATE OUT MINERAL OIL. -CIRCULATE OUT 20 BBLS OF MINERAL OIL AND 20 BBLS OF KCL SPACER TO PREPARE FOR NEXT STEP. -CIRCULATE AT 2 BPM TAKING RETURNS TO TIGER TANK WHEN KCL AND MINERAL OIL TO SURFACE _ 02:00 - 04'.15 2.25 DRILL N 12,209.00 PROD? STUCKAT 12209', -HOLD PJSM WITH CREW FOR PUMPING MINERAL OIL. -PUMP 10 BBL KCL SPACER, 40 BBLS MINERAL OIL, IOBBL SPACER. -SPOT20 BBLS ON MINERAL OIL IN ANNULUS, SOAK FOR 20 MINUTES ATTEMPT TO -PULL TO 30 K OVER STRING WEIGHT ON THIRD TRY ORIENT MOTOR 180 DEGREES OUT, PULL FREE AT 30K OVER STRING WT.. Printed 11282019 11:24:33AM **All depths reported in Drillers Depths" North America - ALASKA - 3P Operation Summary Report Common Well Name: P-04 AFE No Event Type. RE-ENTER- ONSHORE(RON) Start Date: 12/15/2018 End Cate 1;3/2019 X3 -0197J -C.(2, 351407.00) Page 22 of 30 Project: PBU Site: P Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12.00:OOAM Rig Release: Rig Contractor NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB 1@91 a4usft (above Mean Sea Level) Date From - To HIM Task Code NPT Total Depth Phase Description of Operations (hr) (usft) _ 04:15 - 05:30 1.25 DRILL N 12,209.00 PROD? CIRCULATE OUT MINERAL OIL. -CIRCULATE OUT40 BBLS OF MINERAL OIL AND 20 BBLS OF KCL SPACER TO PREPARE FOR NEXT STEP. -WORK COIL UP TO WINDOW AFTER MINERAL OIL IS CLEAR OF BIT. -OPEN EDC '.-CIRCULATE AT BPM HOLDING 10.1 EMWAT WINDOW '.- SHIP SPACERS AND MINERAL OIL TO TIGER TANK. NOTE:START TO CONDITION MUD TO 60K CPS _SRV NOTE: PERFORM TIE IN AT 11320'+9' 0530 - 0630 1.00 DRILL N 12,209.00 PROW RIH WITH 4.25" LATERAL BHA F/11,501'T/ 12,150' - CLOSE EDC AND ORIENT TOOL FACE TO HIGH CENTER AT 11,501' - NO PUMP AND 17 FPM SAT DOWN SK AT 11,521' - PICK UPAND AND RIH AT 25 FPM AND PASS THROUGH WINDOW AT 11,540' PUMP AT.56 BPM W/ 1927 PSI - AT 1155TSAT DOWN 9K P/U AND INCREASE PUMP RATE.66 BPM IN, .83 BPM OUT W/ 1590 PSI - 11,563' SAT DOWN 7K PICK UPAND BRING PUMP UP TO 1.22 BPM IN, 1.34 BPM OUT W/ 1860 PSI RIH AT 25 FPM 8.63PPG IN, 8.64PPG OUT 0630 - 1030 4.00 DRILL P 12,402.00 PROD? DRILL 4.25" LATERAL FROM 12,209' MD TO 12,402 -MD - FREE SPIN: 3236 PSI, 2.78 BPM IN, 2.81 OUT W/ 3296 PSI - MUD WEIGHT: 8.67 PPG IN, 8.60 PPG OUT, ECD: 9.97 PPG EMW - FOR: 60-90 FT/HR, WOB: 1-2.2 KLBS -SEND 5X5 SWEEP - GETTING STICKYAND WIPING BHA - AFTER DRILLING TO 12,402 PERFORMING BHA WIPERAND WHILE GOING BACK TO BOTTOM BECAME DETAINED AT 12,378' 10:30 - 13:45 3.25 DRILL N 12,402.00 FROM STUCK AT 12,378' - RELAX PIPE AND ATTEMPT PULL FREE WITH NO LUCK - HOLD PJSM WITH CREW FOR PUMPING MINERAL OIL. - PUMP 10 BBL KCL SPACER, 20 BBLS MINERAL OIL, 1 OBBL SPACER. -SPOT10 BBLS ON MINERAL OIL IN ANNULUS AND SOAK FOR 20 MINUTES -ATTEMPT TO PULL TO 30 K OVER STRING WEIGHT WITH NO LUCK - PUMP SECOND 10 BBL INTO ANNULUS AND SOAK FOR 20 MINUTES - ATTEMPT TO PULL TO 30 K OVER STRING WEIGHT WITH NO LUCK - ORIENTER FREE Printed 1/28/2019 11.24.33AM **All depths reported in Drillers Depths" North America - ALASKA- BP Operation Summary Report Common Well Name: P-04 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2018 Project: PBU Site: P Rig Name/No.: CDR -2 Spud DateTme: 6/11/1991 Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Hrs Task Code NPT (hr) 1345 - 15.30 1.75 DRILL N 15.30 - 00:00 8.50 DRILL N 12/31/2018 00:00 - 01:45 1.75 DRILL N Page 23 of 30 End Date: 1/3/2019 X3 -0197J -C: (2,351,407.00 ) Rig Release: Total Depth Phase Description of Operations 12,402.00 PROD1 CIRCULATE OUT MINERAL OIL. - PLACE STRING IN NEUTRAL - CIRCULATE OUT 20 BBLS OF MINERAL OIL 'AND 20 BBLS OF KCL SPACER TO PREPARE I FOR NEXT STEP. - CIRCULATE AT 3 BPM HOLDING 10.1 EMW AT WINDOW - SHIP SPACERS AND MINERAL OIL TO TIGER TANK - MUD AT 58K CPS LSRV 'DISCUSS RESULTS WITH ODEAND WSUP, DECISION MADE TO PUMP A40 BBL LVT PILL. WAIT ON PUP TRAILERS TO RETURN TO LOCATION 12,402.00 PROD1 STUCK AT 12,378' ,-HOLD PJSM WITH CREW FOR PUMPING MINERALOIL. --PUMP IO BBL KCL SPACER, 40BBLS MINERAL OIL, 10BBL SPACER. - SPOT20 BBLS ON MINERAL OIL IN ANNULUS, SOAK FOR 20 MINUTES ATTEMPT TO PULLTO 30 K OVER STRING WEIGHT NO IMPROVEMENT. - WORK PIPE FROM NEUTRAL WEIGHT TO 30K OVER WITH NO IMPROVEMENT. - SPOT AN ADDITIONAL 10 BBLS ON OUTSIDE OF PIPE FOR 30 BBLS TOTALAND SOAK FOR 20 MINUTES.ATTEMPT TO PULLTO 30 K OVER STRING WEIGHT NO IMPROVEMENT. - SPOT AN ADDITIONALIO BBLS ON OUTSIDE OF PIPE FOR 40 BBLS TOTALAND SOAK FOR 20 MINUTES.ATTEMPT TO PULL TO 30 K OVER STRING WEIGHT NO IMPROVEMENT -WORK PIPE FROM -5K FROM NEUTRAL WEIGHT TO 30K OVER WITH NO IMPROVEMENT.. -SOAK FOR AN ADDTIONAL 30 MINUTES. -WORK PIPE FROM -5K FROM NEUTRAL WEIGHT TO 30K OVER WITH NO IMPROVEMENT. -PUMP MINERAL OIL TO SURFACE, BLEED IMPOSED PRESSURE AND WORK FROM -5K FROM NEUTRAL WEIGHT TO 30K OVER WITH NOIMPROVEMENT. -PUMP SPACER AND MINERAL OIL TO TIGER _ TANK. 12,402.00 PROD1 WORKSTUCKPIPE -PJSM WITH CREW -ORIENT MOTOR TO LOWSIDE -SPOT MINI TANKER WITH 60 BBLS OF MINERAL OILAND RIG UP LINESPUMP 60 BBL OF MINERAL OIL WITH A 15 BBL LEAD/TAIL SPACER, SPOTTING 30 BBLS MINERAL OIL OUTSIDE OF PIPE WITH PIPE IN TENSION. -AS SOON AS 30 BBLS OF MINERAL OIL IS OUTSIDE PIPE, PIPE CAME FREE. NOTE: AS SOON AS PIPE CAME FREE EXPERIENCED DYNAMIC LOSSES OF 30 BBLS PER HOUR. REDUCED ECD TO 9.0 PPG AND REGAINED FULL RETURNS, SLOWLY RETURNED ECOS TO 106 PPG WITH FULL RETURNS. Printed 1/28/2019 11:24:33AM ••AJI depths reported in Drillers Depths— Common Well Name. P-04 Event Type. RE-ENTER- ONSHORE (RON) Rig Name/No.: CDR -2 Active datum: KB @91.64us8 (above Mean Sea Date From - To Him (hr) 01:45 - 0415 2.50 0415 - 0730 3.25 0730 - 1030 3.00 1030 - 1230 2.00 North America - ALASKA - BP Page 24 of 30 Operation Summary Report Stan Date: 12/15/2018 End Date: 1/3/2019 Site: P Spud Date/Time: 6/11/1991 12:00:00AM AFE No {3-0197)-C: (2,351 407 00 ) BPUOI: USA00001646 Task Code NPT Total Depth Phase Description of Operations (usft) DRILL N 12,402.00 PROD1 CIRCULATE OUT SPACERS, MINERAL OILAND DRILL N DRILL N DRILL P 12.30 - 17:00 4.50 DRILL N 1700 - 1815 1.25 DRILL N 18:15 - 18:45 0.50 DRILL N Printed 1/2812019 11:24:33AM **All depths reported in Drillers Depths" CONDITION HOLE -CIRCULATE OUT SPACER AND MINERAL OIL WHILE RECIPROCATING PIPE. -PUMP 10 BBL LO VIS X 10 BBL HI VIS SWEEP AT 3 BPM. HI VIS WEIGHTED TO 9.1 PPG. -POOH TO 11510 -PUMPING AT 2 BPM WHILE BIT IS CROSSING WINDOW TRAY. 4K OVERPULL COMING THROUGH WINDOW WITH BHAAT 11575'. PUMP PRESSURE COMING UP INDICATING PACK OFF, RBIH 20' AND COME UP THROUGH WINDOW WITH NO ISSUES. -SHUT OFF PUMPS AND OPEN EDC 12,402.00 PROD1 WIPER TRIP 7O 3600' -JET TO BOTTOM OF TRAY THROUGH OPEN EDC AT 3.5 BPM AT 3298 PSI -WORKAREA BETWEEN WINDOWAND BOTTOM OF 41/2" LINER X 2 AT 4 BPM —PUMP 10 BBL LO VIS X 10 BBL Al VIS SWEEP AT 3 BPM. HI VIS WEIGHTED TO 9.1 PPG. TIMED TO COME OUT OF EDC AT 8600' POOH FROM 10300' TO 8600' AT 80 FPM POOH FROM 8600' TO 3600' AT 60 FPM CHASING SWEEP OUT OF HOLE. -HAD CHOKE PLUGGING ISSUES WITH SMALL -MECHANICAL SHALE _CUTTINGS. 12,402.00 PROD? RIH -RIH FROM 3600' TO 11385' -TIE IN LOG FROM 11385' TO 11320', CORRECTION+2' -RIH FROM 11385' TO 11510' CLOSE EDC AND PERFORM WEIGHT CHECK49K UP 22K DOWN. -RIH FROM 11510' TO 12407'. NOTE: TOOK WEIGHTAT 11540' PU AND RUN BACK THROUGH WITH NO ISSUES. 12,402.00 PROD? DRILL 4.25" LATERAL FROM 12,407' MD TO 12508' MD - FREE SPIN: 3941 PSI, 2.71 BPM IN, 2.81 OUT. ON BOTTOM 4156 PSI - MUD WEIGHT: 8.67 PPG IN, 8.60 PPG OUT, ECD: 9.97 PPG EMW - ROP: 50 FT/HR, WOB: 2.1 KLBS NOTE. BLOW DOWN CHOKE DUE TO CLOGGING WITH SMALL MECHANICAL SHALE CUTTINGS.___ _ 12,508.00 PROD1 WORK ON BAKER HUGHES INTEO COMPUTER SYSTEM DUE TO REAL TIME DATA NOT UPDATING.. -RECIPROCATE PIPE F 12450'-12150' PUMPING AT 2.7 BPM PUMP 10 BBL HI VIS WEIGHTED SWEEP 9.1 PPG - NO INCREASE IN CUTTINGS NOTED AT SWEEP BACK TO SURFACE 12,508.00 PROD? WIPERTRIP -POOH FROM 12150' TO 11540' -SOME PACKING OFF NOTED, JOG BACK IN HOLE TO RELIEVE, NO OTHER ISSUES. -GR TIE IN (RA) CORRECTION +5' 12,508.00 PROD1 RIH FROM 11540' TO 12508' Printed 1/2812019 11:24:33AM **All depths reported in Drillers Depths" Common Well Name: P-04 Event Type: RE-ENTER- ONSHORE (RON) Rig NameMo.: North America - ALASKA - BP Page 25 of 30 Operation Summary Report Start Date'. 12/15/2018 Site: P AFE No End Date. 1/3/2019 X3 -0197J -C:(2,351,407.001 Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001M Active datum: KB Q91.64us8 (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ (ui _ 18:45 - 19:15 0.50 DRILL P 12,536.00 PROD1 DRILL 4.25' LATERAL FROM 12,508'MD TO 19:15 - 22:45 3.50 DRILL N 22'.45 - 00:00 1.25 DRILL N 1/1/2019 0000 - 0300 3.00 DRILL N 03:00 - 03:45 0.75 03:45 - 04:30 0.75 DRILL N DRILL N Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths" 12538' MD - FREE SPIN: 3941 PSI, 2.71 BPM IN, 2.81 OUT, ON BOTTOM 4156 PSI - MUD WEIGHT'. 8.67 PPG IN, 8.60 PPG OUT, ECD: 10.5 PPG EMW - ROP: 56 FT/HR, WO_B: 2.1 KLBS 12,536.00 PROD1 STUCK AT 12,536' - RELAX PIPE AND ATTEMPT PULL FREE WITH NO LUCK - HOLD PJSM WITH CREW FOR PUMPING 'MINERALOIL. - PUMP 10 BBL KCL SPACER, 20 BELS MINERAL OIL, IOBBL SPACER. -SPOT10 BBLS ON MINERAL OIL IN ,ANNULUS AND SOAK FOR 20 MINUTES -ATTEMPT TO PULL TO 30 K OVER STRING WEIGHT WITH NO LUCK -PUMP SECOND 10 BBL INTO ANNULUS AND SOAK FOR 20 MINUTES - ATTEMPT TO PULLTO 30 K OVER STRING WEIGHT WITH NO LUCK NOTE: ORIENTER FREE 12,536.00 PROD1 STUCKAT 12,536' -PREP TO PUMP CRUDE OIL -DISPLACE SPACERS AND MINERALOIL FROM ANNULUS -HOLDING COIL AT 30K OVER STRING WEIGHT. -HOLD PJSM WITH CREW COVERING OCN FOR PUMPING CRUDE. 12,536.00 PRODI WORK STUCK PIPEIPUMP CRUDE -HOLD 20K OVERPULL ON COIL -CHECK VALVE LINE UPS -PUMP 20 BBLS OF KCL SPACER -PUMP 86 BBLS OF CRUDE OIL (23 BBLS OUT OF BIT) AT 2.3 BBLS PER MINUTE. -COIL CAME FREE -RECIPROCATE FROM 12531 -SWAP TO PUMPING 20 BBLS OF KCL SPACER AT 2.6 BPM WHILE RECIPROCATING PIPE. -SWAP BACK TO 8.6 PPG QUICK DRILL N -TAKE KCL SPACERS AND CRUDE OIL TO TIGER TANK 12,536.00 PROD1 WIPERTRIP -POOH FROM 12150' TO 11535' -SOME PACKING OFF NOTED, JOG BACK IN HOLE TO RELIEVE, NO OTHER ISSUES. -GR TIE IN (RA) CORRECTION +8' NOTE AT 12150' NOTICE CHOKE PRESSURE AND ECDS CLIMBING, SWAP OFF DRILLING CHOKEAND CLEAN SAME. CLEARED PRESSURE BUILD UP. 12,536.00 PROD1 RIH FROM 11558' TO 12538' PUMPING AT.25 BPM THROUGH BUILD SECTION, INCREASE RATE AT 12125TO 2.7 BPM. Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 26 of 30 Operation Summary Report Common Well Name. P-04 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2018 End Dale: 1/3/2019 X3 -0197J -C: (2,351,407.00 ) Project: PBU Site. P Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ (usH) 04:30 - 11:30 7.00 DRILL P 12,945.00 PROD1 DRILL 4.25° LATERAL FROM 12,536'MDTO 12,945.13' MD - FREE SPIN: 3705 PSI, 2.7 BPM IN, 2.68 OUT. ON BOTTOM 3846 PSI — MUD WEIGHT: 8.67 PPG IN, 8.60 PPG OUT, ECD: 10.37 PPG EMW ON BOTTOM AND 10.2 EMW AT WINDOW -PICK UP RATE T/ 2.9 AT 12,64TWITH FREE SPIN AT 3925 PSI, ON BOTTOM 4270 PSI - WIPING HOLE 150' AFTER DRILLING EVERY 150', PERFORM LONG WIPER WITH JOG AT TOP OF LATERALAND TOP OF BUILD BEFORE PASSING THROUGH WINDOW AT.3 BPM, 1230 PSI. WITH TF AT 0* HIGH SIDE - OPEN EDCAND PUMPAT PUMP 5BBL LO -VIS X 5BBL HI -VIS SWEEP AT 12,636', PUMP 15BBL LO -VIS X 15 BBL WEIGHTED HI -VIS SWEEPAT 12,945' 30% INCREASE IN CUTTINGS AT THE SHAKER MOSTLY SAND WITH A LITTLE SHALE 1130 - 14:30 3.00 DRILL P 12,945.00 PROD1 LONG WIPER TRIP TO CLEAN OPEN HOLE AND 5-1/2" TUBING - PERFORM LONG WIPER WITH JOG AT TOP OF LATERALAND TOP OF BUILD BEFORE PASSING THROUGH WINDOW AT .5 BPM, 1230 PSI. WITH TEAT 0* HIGH SIDE WITH NO PROBLEMS - OPEN EDC AND PUMP AT 3.98 BPM WITH 4069 PSI - JET WHIPSTOCK MOVING DOWN TO BIT DEPTH OF 11,597' AND JETTING 5-1/2" TUBING WHILE POOH T/ 11,300' BIT DEPTH AND JOG IN 5-1/2" - LOG TIE IN WITH +B' CORRECTION -CLOSE EDC AND PASS THROUGH WINDOW WITH NO PUMP WITH TF AT HIGH SIDE WITH NO PROBLEM - START PUMPING AT 1 BPM WITH 1900 PSI AND STEER THROUGH BUILD SECTION AT 25 FPM -AFTER BUILD AT 12,150' BRING UP PUMP RATE T/ 2.88 BPM WITH 3950 PSI AND RIH T/ BOTTOM AT 25 FPM - WITH THE +8' CORRECTION BOTTOM AT 12,950' 1430 - 1700 2.50 DRILL P 12.945.00 PROD1 DRILL 4.25' LATERAL FROM 12,950' MD TO 13,053' MD (8918' TVD) - FREE SPIN: 4050 PSI, 2.89 BPM - RATE: 2.89 BPM IN, 2.87 BPM OUT. CIRC PRESSURE: 4100-4270 PSI - MUD WEIGHT: 8.78 PPG IN, 8.68 PPG OUT, WOB: 2-3K, ECD ON BOTTOM 10.47 EMW, ECD AT WINDOW 10.3 EM W - STUCK AT 13,053' MD AT 16:45 - RELAX PIPEAND SHUT DOWN PUMPS -ATTEMPT TO PULL FREE THREE TIMES - PLACE STRING IN NEUTRALAND PUMP HI -VIS SWEEP Printed 128/2019 11:24:33AM **All depths reported in Drillers Depths** North America - ALASKA - BP Page 27 of 30 Operation Summary Report Common Well Name: P-04 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2018 End Date. 1/3/2019 X3 -0197J -C: (2,351,407.001 Project: PBU Site: P Rig Name/No.: CDR -2 Spud DataTme: 6/11/1991 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum. KB @91.64usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ (usft) _ 17.00 - 21'00 4.00 DRILL N 13,053.00 PROD1 STUCK AT 13,053 - CONTACT TOWN TEAM AND DEVELOP OCN #8 - PREP TO PUMP CRUDE OIL -DISPLACE SWEEP FROM WELL WITH STRING IN NEUTRAL - HOLD PJSM WITH CREW COVERING OCN FOR PUMPING CRUDE - CONFIRM LINE UP AND WALK FLOWPATH - CONFIRM WEIGHT OF CRUDE AT 7.3 PPG AND 3.5% LUBES IN ACTIVE MUD - PULL STRING TO 20K OVER - PUMP 10 BELS SPACER OF 3% KCL AT 2BPM WITH 2600 PSI - PUMP 60 BBLS 7.3 PPG CRUDE AT 2BPM WITH 3370 PSI - PUMP 10 BBLS SPACER OF 3% KCLAT 2BPM WITH 3400 PSI - CHASE WITH 8.7 PPG QUIKDRLIL-N WITH 3200 PSI - AFTER 23 BBLS OF CRUDE OUT OF PIPE STRING CAME FREE AT 19:30 HRS - RECIPROCATE PIPE IN LATERALAND BRING PUMP RATE UP TO 2.71 BPM IN WITH 2.55 BPM OUTAT 3870 PSI AND 9.8 EMW ECD TIMING TO PUMP SECOND SPACER OUT OF PIPE ON BOTTOM AND REMOVE CRUDE AND KCL FROM WELL TO TIGER TANK - ONCE SPACER ABOVE BHA RECIPROCATE PIPE F/ 13,053' T/ 12,125' AT 25 FPM - ALL CRUDE AND KCL OUT OF WELL PUMP WEIGHTED HI -VIS SWEEP _ 21:00 - 23:00 2.00 DRILL N 13,053.00 PROD1 CLEAN UP WELLBORE AND TIE IN - PUMP WEIGHTED HI -VIS SWEEP AT 2.93 BPM IN, 2.98 BPM OUT AT 3960 PSI - LOG RA TAG WITH t5 - RIH BACK TO BOTTOM. 23:00 - 00:00 1.00 DRILL P 13,053.00 PROD1 DRILL 4.25"LATERAL FROM 13053'MD TO 13096' - FREE SPIN: 4037 PSI, 2.86 BPM - RATE: 2.86 BPM IN, 2.97 BPM OUT. CIRC PRESSURE: 4037-4479 PSI - MUD WEIGHT: 8.79 PPG IN, 8.68 PPG OUT, ECD: 10.44 PPG - ROP: 105-140 FT/HR, WOB: 2.5 KLBS FREQUENT PICKUPS 1/2/2019 0000 - 0200 2.00 DRILL P 13,053.00 PROD? DRILL 4.25"LATERAL FROM 13096'TO 13242' - FREE SPIN: 4037 PSI, 2.75 BPM - RATE: 2.75 BPM IN, 2.62 BPM OUT. CIRC PRESSURE: 4037-4479 PSI - MUD WEIGHT: 8.79 PPG IN, 8.68 PPG OUT, ECD: 10.55 PPG - ROP: 105-140 FT/HR, WOB: 2.5-3.5 KLBS - FREQUENT PICKUPS Printed 1128/2019 11'.24.33AM "All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 28 of 30 Common Well Name. P-04 - PULL 30K OVER. NO LUCK. AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 12/15/2018 End Date. 1/3/2019 X3 -0197J -C:(2,351,407.001 Project: PBU Site: P - PUMP 10 BBLS KCL SPACER Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:00.00AM - PUMP 40 BBLS DEAD CRUDE Rig Release: Rig Contractor. NABORSALASKA DRILLING INC. - PUMP 10 BBLS KCL SPACER BPUOI: USA00001646 Active datum: KB @91.64usR (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) 13,242.00 PROD1 (usft) _. 02:00 - 05:00 3.00 DRILL N 13,242.00 PROD1 DIFFERENTIALLY STUCK AT 13242' Printed 1/28/2019 11:24:33AM •RAIZ depths reported in Drillers Depths** - PULL 30K OVER. NO LUCK. - PREPARE TO TO PUMP CRUDE. DISCUSS MODIFICATIONS OF VOLUMES WITH ODE. - PUMP 10 BBLS KCL SPACER - PUMP 40 BBLS DEAD CRUDE - PUMP 10 BBLS KCL SPACER - PULL 20K OVER. - PULLED FREE WITH 6 BBLS OUT. - CONTINUE PUMPING CRUDE OUT. 05.00 - 06'30 1.50 DRILL P 13,242.00 PROD1 DRILL 4.25" LATERAL FROM 13242' TO 13369' - FREE SPIN: 3838 PSI, 2.70 BPM - RATE: 2.69 BPM IN, 2.65 BPM OUT. CIRC PRESSURE: 3838 -4216 PSI - MUD WEIGHT: 8.82 PPG IN, 8.70 PPG OUT, ECP. 10.56 PPG _ -ROP: 161 FT/HR, WOB: 2.5KLBS 06:30 - 08:00 1.50 DRILL N 13,369.00 PROD? DIFFERENTIALLY STUCKAT 13369' - PULL 30K OVER. NO LUCK - PREPARE TO TO PUMP CRUDE - DISCUSS VOLUMES WITH ODE - 07:05 PUMP 10 BELS KCL SPACER - PUMP 40 BELS DEAD CRUDE -PUMP 10 BBLS KCL SPACER HOLD 20_K OVER 0800 - 11:00 3.00 DRILL P 13,369.00 PROD1 - PULLED FREE WITH 17 BBLS OUT '.- CONTINUE PUMPING CRUDE OUT DRILLED 424' PERFORM LONG WIPER TO WINDOW .- PUMPA 10X10 LOW & HIGH VIS FOR THE WINDOW - JOG IN HOLE 100' FROM THE WINDOW AT 1 BPM -PULLTHROUGH WINDOWAT 0.3 BPM AND OPEN THE EDC - CALLED IN 35 BBL CMT LOAD OUT TO SLB KEITH AT 09:30 - POOH AT 4.0 BPM TO 11290' - LOG TIE IN WITH A+7' CORRECTION AND RIH -SHUT DOWN PUMP, CLOSE EDC -CLEAN THROUGH, BRING PUMP ONLINE AT 1.0 BPM THROUGH BUILD 11:00 - 15:40 4.67 DRILL P _ 13,369.00 PROD1 DRILL 4.25" LATERAL FROM 13242' TO 13369' - FREE SPIN: 3950 PSI, 2.79 BPM - RATE: 2.79 BPM IN, 2.69 BPM OUT. CIRC PRESSURE: 3950-4430 PSI - MUD WEIGHT: 8.83 PPG IN, 8.73 PPG OUT, ECD: 10.66 PPG - ROP: 100 FT/HR, WOB: 3.25 KLBS - 13470' GEO WANTS TO HEADING DOWN AT -120' TO TO AT -13600' 15'RO - 19:00 3.33 DRILL P 13,600.00_ PROD? DRILLED TO PLAN TD PERFORM WIPER TRIPS AS PER PLAN -WIPER TO WINDOW - JET TRAY AT 4.0 BPM. JET S-1/2"WITH 10 BELS HIVIS AND CHASE UP INTO 4-1/2" TAIL. - RUN BACK TO WINDOW. ATTEMPT TO CLOSE EDC. FAILED AT 20% CLOSED Printed 1/28/2019 11:24:33AM •RAIZ depths reported in Drillers Depths** North America - ALASKA- SP Operation Summary Report Common Well Name: P-04 - 0230 Event Type: RE-ENTER- ONSHORE (RON) Project PBU------ -- Start Date: 12/15/2018 -Site :P Rig Contractor: NABORSALASKA DRILLING INC. Active datum: KB @91.64usft (above Mean Sea Level) Date From - To His Task (hr) 1900 - 0000 5.00 DRILL Page 29 of 30 AFE No End Date. 1/3/2019 X3-0197,1-0.(2,351,407,00) Code NPT Total Depth lush) N 13,600.00 1/3/2019 0000 - 0230 2.50 DRILL P 13,600.00 X02:30 - 03:45 1.25 DRILL P 13,600.00 0345 - 0500 1.25 DRILL N 13,600.00 0500 - 07.30 2.50 DRILL N I 13,600.00 0730 - 15'.45 6.25 DRILL P 13,602.00 BPUOI: USA00001646 Phase Description of Operations PROD1 MWD TROUBLESHOOT FAILURE. EDC POSITION UNKNOWN. SHOWING 60%OPEN. CIRCULATING PRESSURES SHOWING MORE LIKELY JUST PARTIAL OPEN. i - POOH FOR BHA -2.78 BPM IN /2.29 BPM OUT 8.83 PPG IN/ 8.75 PPG OUT. SLOW PUMP RATE WHEN GOING BY JEWELRY. -PERFORM JOG AT SURFACE. PERFORM10 MINUTE PUMP OFF FLOW CHECK. ^3 BPH LOSS. - PERFORM LUBRICATOR PURGE TO TIGER TANK TO GET CRUDE OUT OF UPPER LUBRICATOR FROM DIFFERENTIAL STICKING EVENTS. - BEGIN LAYING BHA DOWN. PROD1 BHA LAID DOWN BY 00:30 MEASURE WALLTHICKNESS ON PIPE. 0.11 (42% WALL LOSS) - CUT 25' COIL. INSTALL COIL CONNECTOR. PULL TEST TO 50K GOOD TEST. PROD1 INSTALL UQC AND FLOATS. - PERFORM 250 PSI LOW / 3500# HIGH ON COIL CONNECTOR /UQC - PERFORM 3500 PSI TEST ON DUAL FLOATS. GOOD TEST PROD1 MAKE UP 4.25" DRILLING BHA#9 - PICK UP 2-718" ULS (1.0 DEG AKO) AND 3.0" COILTRAK TOOLS -MAKE UP 4.25" HYCALOG RERUN BICENTER BIT AND RERUN AGITATOR. - SURFACE TESTED TOOL. GOOD TEST. - PRESSURE TEST QTS TO 250 PSI LOW FOR 5 MINUTES / 3500 PSI HIGH FOR 5 MINUTES - INJECTOR ON: 04:30 PRODi RIH WITH DRILLING BHA TO LOGGING DEPTH. _ DISCONTINUE BHI NPT PROD1 RIH WITH 4.25" DRILLING BHA - LOG TIE IN - CORRECT DEPTH -12' AND RIH - TAG TO AT 13602' CORRECTED DEPTH - POOH CHASING A HIGH VIS PILL TO THE WINDOW - PU TO THE WINDOW, JOG IN HOLE 100' - PU TO THE WINDOW AND PULL THROUGH AT 0.3 BPM - ABOVE THE WINDOW SHUT DOWN PUMP AND OPEN THE EDC - POOH AT MAX RATE PUMPING PILLS TO SURFACE Printed 1/28/2019 11:24:33AM **All depths reported in Drillers Depths" North Ar renca -ALASKA - BP Page 30 of 30 Operation Summary Report Common Well Name: P-04 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 12/15/2018 Eno Date: 1/3/2019 X3 -0197J -C: (2,351,407 00 ) Project: PBU Site: P Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. SPUD] : USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usR) 15.45 - 1730 1.75 DRILL P 13,602.00 PROD1 PILLS FROM TOOH ARE CLEAN VERY LITTLE 1730 - 1930 19.30 - 2200 2200'. - 0000 2.00 2.50 DRILL P DRILL P CUTTINGS - 50' FROM SURFACE JOG IN HOLE - NO INCREASE IN CUTTING - TAG UP, RESET DEPTHS AND RIH AT MAX RATE - 9000' WHP AT 165 PSI, REDUCE RATE TO 3 BPM - LOG TIE IN -10.5', CLOSE EDC - RIH, BRING PUMP ON AT 1.0 BPM AFTER THE WINDOW TO TD - TAG AT 12093, SHUT DOWN PUMP, PU & TRY AT 0.5 BPM AND PASSED THROUGH SHALE 13,602.00 PROD? DYNAMIC FLOW CHECK 10 MIN. GOOD TAG TO, PU AND START LINER PILL WITH BEADS - LAID IN 8.6 PPG LINER RUNNING PILL WITH 11.5 PPG BEADS. TAILED WITH 10 BBLS OF HIVIS SWEEP. - PULL THROUGH WINDOW WITHOUT ISSUE. - OPEN EDC. HI VIS AT EDC. - PULL THROUGH 5-1/2" AT 40 FPM. PUMPING X13.72 BPM. 13,602.00 PROD1 '- MUD WEIGHT: 8.82 PPG IN, 8.74PPG OUT RATE: 3.73 BPM IN, 3.25 BPM OUT - PAINT YELLOW FLAG AT 11035.70' BIT DEPTH (10966.63' EOP) - PAINT WHITE FLAG AT 8952.65' BIT DEPTH (8883.58' EOP) - PUMPED 15 BBL HIVIS SWEEP AT 4000'. CHASED OUT OF HOLE. MINIMALSOUDS. 2.00 DRILL P 13,602.00 PROD1 MONITOR WELL FOR 10 MINUTES AT BHA: STATIC - INJECTOR OFF: 10:30 - LAV DOWN BHA#9. Printed 1128/2019 11'.24:33AM "All depths reported in Drillers Depths" Printed 1/28/2019 11:25.06AM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 1 of 13 Operation Summary Report Common Well Name: P-04 AFE No Event Type: COM- ONSHORE (CON) Start Date: 1/4/2019 End Date: 1/10/2019 X3 -0197J -C: (979,713.00) Project PBU Site: P Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12ee00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 1/4/2019 00:00 - 03:00 3.00 CASING P 13,602.00 RUNPRD PJSM, REVIEW STEPS FOR PREPARING LINER. - LO E -LINE. MWD REMOVE LOC. INSTALL BOOT ON E -LINE. - MAKE UP SINGLE JOINT OF 2-3/8" BTS -6. - STAB ON WELL. PUMPAT4.5 BPM TO PUMP SLACK OUT. - PERFORM 3 CYCLES. E -LINE NO LONGER MOVING - PUMP 181' OF POSSIBLE 271' OUT. - BOOT E -LINE. MAKEUP STINGER AND NOZZLE 0300 - 0400 1.00 CASING P 13,602.00 RUNPRD PJSM FOR LAUNCHING DRIFT BALL. -LOAD AND LAUNCH 7/8" DRIFT BALL. - PRESSURE UP TO 3500#. DUMP. COME ONDNEAT3.5BPM. BALLROLLING - SHUT DOWN AND BREAKDOWN. RECOVERED 7/8" STEEL BALL. 04.00 - 0600 2.00 CASING P 13,602.00 RUNPRD MAKE BOT X -OVER AND SWIVEL. - RU ELEVATORS AND PREP RIG FLOOR TO RUN SAFETY JOINT DRILLS WITH THE CREW Printed 1/28/2019 11:25.06AM **All depths reported in Drillers Depths" Common Well Name. P-04 Event Type: COM- ONSHORE (CON) North America - ALASKA - BP Page 2 of 13 Operation Summary Report Start Date 114/2019 End Date. 1/10/2019 AFE No (979,713.00 ) Project: PBU Site: P Rig Name/No.: CDR -2 Spud DatelTime. 6/11/1991 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64us6 (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations ----- _ (hr) _ (usft) _ _ 06:00 - 08:30 2.50 CASING P 13,602.00 RUNPRD PJSM FOR RUNNING LINER AND WALK THROUGH ROLES & RESPONSIBILITIES DRILL #1 WALK THROUGH KICK WHILE TRIPPING DRILL WITH THE CREW STEP BY STEP ON THE FLOOR - FLOOR SAVER SET TO HIGH, ADJUST FOR LATCHING PIPE - HAD TROUBLE LATCHING UP THE ELEVATORS, READJUST POSITION OF SAFETY JOINT STICKING OUT OF THE V -DOOR HOLD AAR AND DISCUSS ISSUES - MARKING THE SAFETY JOINT FOR THE V -DOOR - PUTTING A MARK ON THE MAST LEG FOR WHERE TO STOP THE TOP DRIVE FOR LATCHING UP - MU THE CROSS OVER TO THE TUBING STUMP, MT THREAD EASIER TO MU THAN LINER THREADS DRILL#2 - DRILLER STOPPED THE JOB TO HAVE THE FLOOR HANDS STEP BACK LITTLE FARTHER FROM THE RED ZONE ON THE RIG FLOOR - HAD PROBLEMS LATCHING UP THE ELEVATORS HOLD AAR AND DISCUSS - PULL SAFETY JOINT TO THE SIDE TO GET IT IN THE SLIPS OF THE ELEVATOR MAKES IT EASIER TO LATCH DRILL #3 - NO REAL ISSUES JUST A LITTLE STRUGGLE TO GET THE ELEVATORS LATCHED UP - STARTED MAKING UP THE DOG COLLAR BEFORE THE WELL WAS SECURED, CLOSE TIW VALVE BEFORE MU DOG COLLAR - WELL SECURED IN 3:16 - DRILL COMPLETE WITH ALL IN POSTIONS AT 3:57 AAR - MARK THE TIW VALVE WITH A LINE INLINE WITH THE VALVE, IF FLUID IS COMING OVER THE TOP IT WILL BE DIFFICULT TO TO FIND THE KEY HOLE TO CLOSE THE VALVE DRILL #4 - NO ISSUES LATCHING ELEVATORS - WELL SECURED IN 2:37 - DRILL COMPLETE WITH ALL IN POSTIONS AT 3:55 AAR - DRILL WENT WELL, NO REAL ISSUES - STOP TO TAKE PICTURES OF WHERE THE Printed 1/28/2019 11:25:06AM "All depths reported in Drillers Depths`" North America - ALASKA - BP Operation Summary Report Page 3 of 13 Common Well Name: P -D4 AFE No Event Type: COM- ONSHORE(CON) Start Date. 1/4/2019 End Date: 1/10/2019 X3 -0197J -C'.(979,713.00) Project: PBU — --- _ Site: P Rig Name/No.: CDR -2 Spud DaterTime: 6/11/1991 12:00 OOAM Rig Release. Rig Contractor: NABORSALASKA DRILLING INC. BPUO1 USA00001646 Active datum: KB @91.64usft (above Mean Sea Level Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr)_ - (usft) - CREW MEMBERS ARE TO STAND DURING PIPE OPERATIONS 0830 - 0900 0.50 CASING P 13,602.00 RUNPRD CREW CHANGE 0900 - 11:00 2.00 CASING P 13,602.00 RUNPRD PJSM WITH ON COMING CREW TO RUN LINER AND CONDUCT WELL CONTROL DRILLS BEFORE MU LINER DRILL #1 WALK THROUGH KICK WHILE TRIPPING DRILL WITH THE CREW STEP BY STEP ON THE FLOOR - REVIEW AAR'S FROM PREVIOUS CREW - WALKTHROUGH DRILL FOLLOWING I STANDING ORDERS STEP BY STEP -LOOKED AT THE ELEVATOR LATCH UPAND 'MADE ADJUSTSMENTS FOR WORKING IN THEIR GREEN ZONE AAR - CREW IS GOOD WITH THE STANDING ORDERS DRILL #2 - PERFORM KWT DRILL - DRILLER DIRECTED THEM THROUGH EACH STEP OVER THE RADIO AND WENT WELL HOLD AAR AND DISCUSS NO DEFICIENCIES DRILL #3 - ELEVATOR LATCH WENT SMOOTH - WELL SECURED IN 2:02 - DRILL COMPLETE WITH ALL IN POSITIONS AT 3:46 AAR - FLOOR HAND FORGOT TO TAKE THE 4 GAS METER TO THE CELLAR DRILL #4 -NO ISSUES LATCHING ELEVATORS - WELL SECURED IN 2: 00 - DRILL COMPLETE WITH ALL IN POSTION AT 342 AAR - NO DEFICIENCIES TO REPORT DISCUSS CREW DRILL PROFICIENCY WITH WSUP, GOOD TO PROCEED WITH LINER OPS _ 11:00 - 11:30 0.50 CASING P 13,602.00 RUNPRD BOT CHANGED OUT, HOLD A PJSM TO REVIEW BOT LINER PROCEDURE TO MU LINER WALK THROUGH LINER LAYOUT WITH BTT _REP____ _ 11:30 - 16:15 4.75 CASING P 13,602.00 RUNPRD MU LINER ASPER APPROVED SUMMARY -FILL FIRST 5 JOINTS AS PER NABORS LINER RUNNING PROCEDURE THEN EVERY 10 JOINT - 15:00 ALL 2-7/8 RAN, VERIFY PIPE COUNT IN PIPE SHED, GOOD Printed 1/28/2019 11:25:06AM **All depths reported in Drillers Depths** North America - ALASKA - BP Operation Summary Report Page 4 of 13 Common Well Name: P-04 - 0000 2.00 AFE No Event Type: COM- ONSHORE(CON) Start Date. 1/4/2019 End Date: 1/10/2019 X3 -0197J -C:(979,713,00) Project: PBU Site: P 4.83 CASING P Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:00:00AM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. - FILL PIPE WHILE SWAPPING ELEVATORS BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) JOINTS OF 2-3/8" PH6. Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (us%) 16:15 - 17:00 0.75 CASING N 13,602.00 RUNPRD RAN FIRST JOINT OF 3-1/4" IN AND THE DRAW 17:00 - 22:00 5.00 CASING P 2200 - 0000 2.00 CASING P 1/5/2019 00:00 - 01:00 1.00 CASING P 01:00 - 05:50 4.83 CASING P 0550 - 0710 1.33 CASING N Printed 1/28/2019 11:25:06AM "All depths reported in Drillers Depths" WORKS WILL NOT MOVE STAB TI W VALVE AND WAIT FOR ELECTRICIAN. DRAW WORKS REPAIRED, 'GRID RESISTOR PROGRAMMING ISSUE. 13,602.00 RUNPRD CONTINUE LINER OPS -RUN REMAINING 3-1/4" LINER. -MAKE UP 6 JOINTS OF 34/2" ST -L WITH THE 3 PUPS. - FILL PIPE WHILE SWAPPING ELEVATORS - MAKE UP LINER RUNNING TOOLAND6 JOINTS OF 2-3/8" PH6. -CREWCHANGE 13,602.00 RUNPRD RUN LINER ON COIL - PRESSURE TEST QTS TO 250 PSI LOW FOR 5 MINUTES 13500 PSI HIGH FOR 5 MINUTES — INJECTOR ON: 22:00 - MUD WEIGHT: 8.74 PPG IN, 8.76 PPG OUT - RATE: 0.35 BPM IN, 0.44 BPM OUT. CIRC PRESSURE: 1408 PSI 13,602.00 _ _ RUNPRD RIH TO WHITE WINDOW FLAG AT 11433.91', MAKE CORRECTION TO 11419.04' FOR A .-14.87'CORRECTION. COMEOFFUNE. PERFORM PICKUP AT 30 FPM AT 53K. RIH WEIGHT AT 23K PERFORM PICKUP. 5' FOOT FROM COMPRESSION TO TENSION. COME BACK ONLINE AT MIN RATE THROUGH WINDOW TOTAL MUD LOSSES DURING TRIP TO WINDOW 1_8 BBLS. 13,602.00 RUNPRD WORKING LINER TO BOTTOM - START SETTING DOWN AT 12574' START WORKING LINER. - LOSING GROUND. - PUMP 10 BBLS KCL SPACER - PUMP 20 BBLS LVr - PUMP 10 BBLS KCL SPACER - ONCE KCL SPACER OUT, WORK DOWN TO 12730'. -CONTINUE WORKING LINER WHILE LVT COMING OUT SHOE 13,602.00 RUNPRD PULLING HEAVY, RIH TRY TO WORK DOWN I SINCE WE GOT STUCK COMING UP - NOTABLE TO WORK DOWN, FINISH CIRCULATING OUT MINERAL OIL THEN TRY WORKING PIPE - RETURNS ARE 1: 1 Printed 1/28/2019 11:25:06AM "All depths reported in Drillers Depths" North America - ALASKA - BP Page 5 of 13 Operation Summary Report Common Well Name: P-04 AFE No Event Type: COM -ONSHORE (CON) Start Date: 1/4/2019 End Date: 1/10/2019 X3 -0197J -C: (979,713.00) Project: PBU Site: P Rig Name/I CDR -2 Spud Daterrime: 6/11/1991 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _ (hr) (usft) 07:10 - 08'.40 1.50 CASING P 13,602.00 RUNPRD LVT OUT REDUCE THE RATE TO 0.25 AND START WORKING PIPE - SET DOWN -15K, PU TO 87K AND PULLED FREE - PULLING HEAVYAT 12457' - PULLING CLEAN TO 12265' REDUCE RATE TO 0.2 BPM AND RIH - SET DOWN AT 12500', FROM 19K TO 10K, NO MOVEMENT, SHUT DOWN PUMP, NO MOVEMENT - PU TO BREAK OVER AND +5', PU IS CLEAN, RIH AND RAN PAST, BRING PUMP ON AT 0.15 BPM - SET DOWN AT 12573, SHUT DOWN PUMP, NO MOVEMENT, SHUT DOWN PUMP, NO MOVEMENT - PU TO 78K AND MOVING, RIH AND SAT DOWN AT 12574', ONLINE AT 0.7 BPM - SHUT DOWN PUMP, NO MOVEMENT, PU TO 72K+5', RIH AND RAN PAST CLEAN, ONLINE AT 0.15 BPM - SET DOWN AT 121 SHUT DOWN PUMP, PU TO 73K, RIH - SET DOWN AT 12807', ONLINE AT 0.75 BPM AT 1874 PSI - SHUT DOWN PUMP, PU TO 72K+5'AND RSH, RAN PAST 12821' - SET DOWN AT 12873', SHUT DOWN PUMP, PU TO 70K+5' AND RIH, 0840 - 0900 0.33 CASING N 13,602.00 RUNPRD NOT MAKING ANY MORE FOOTAGE, LINER UP TO PUMP 40 BBLS OF MINERAL OILAS PER OCN #10 FOLLOWED BY KCLAND DISPLACE WELL TO KCL 09:00 - 10:40 167 CASING N 13,602.00 RUNPRD ONLINE TO PUMP MINERAL OIL PILL - 10 SPACER / 40 MINERAL OIL/ 10 SPACER FOLLOWED BY KCL TO DISPLACE THE WELL - PU 5' EVERY 5-10 MINUTES VERSE PUH WHILE CIRCUALTING PILL DOWN AND LOOSING GROUND - PICKING UP EVERY 5-10 WE ARE SEEING 5-15K OVER PULL BUT WE ARE MOVING FREELY 1040 - 13'.00 2.33 CASING P 13,602.00 RUNPRD KCLAT THE SHOE, PU 68K CLEAN, RIH TO TRY WORKING DOWN - STACKING OUT, PU AND PULLED TO 88K, PUMP OUT KCLAND 2 BELS OF MINERAL OIL, SHUT DOWN AND SEE IF WE CAN MOVE - PULLED TO 74K AND POPPED FREE - 7 BBLS OF MINERAL OIL OUT AND WE ARE NOT MAKING ANY HOLE - PUH 100' TO 12730 AND ALLOW MINERAL OIL TO SOAK WHERE WE CAN'T GET PASTAT 12845' - NABORS CREW CHANGE - RIH AT 30 FPM FROM 12730' - MADE IT TO 12918', PU TO BREAK OVER AND RIH - MADE IT TO 13009', PU TO BREAK OVER AND RIH, SET DOWN SAME DEPTH, PUMP 3 BBLS LVT - PU CLEAN RIH, SET DOWN, PU AND WE ARE HUNG UP, PUMP 3 BBLS OF LVT Printed 1/28/2019 11.25.05AM `"All depths reported in Drillers Depths" North America - ALASKA - BP Page 6 o/ 13 Operation Summary Report Common Well Name: P-04 AFE No Event Type: COM- ONSHORE (CON) Start Date: 1/4/2019 End Date. 1/10/2019 X3 -0197J -C'. (979,713.00) Proiect: PBU Site: P Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations III (usft) 13:00 - 14:15 1.25 CASING P 13,602.00 RUNPRD PULLED FREE, PU AND PUMP 4 BBLS LVT, Printed 1/28/2019 11:25:06AM **All depths reported in Drillers Depths** SOAK FOR 5 MIN THEN TRY WORKING DOWN I SET OWN AT 12845, PU TO BREAK ORIH AND RAN PAST 12945, SET OWN AT 12997'. PU DH99FPUAND 9 SET DOWN SAME EE, PUMP BBLSWHILE IL TDOWNARIH RHN04 MOVEMENT, WORK PIPE AND GOT FREE - CIRCULATE THE REST OF THE MINERAL OIL _ OUT AND TRY WORKING DOWN_AGAIN 1415 - 1440 0.42 CASING N 13,602.00 RUNPRD WE HAVE EXHAUSTED ALL ATTEMPTS WITH LVT, CALL WSUPT 8 ODE AND DISCUSS PUMPING THE KCL INTO THE WELLBORE AND TRY WORKING PIPE _ 14.40 - 1600 1.33 CASING N ___ 13,602.00 RUNPRD PUMPED 30 BBLS OF KCL OUT, TRY WORKING PIPE - NOTABLE TO MOVE AFTER 4 CYCLES, PULL INTO TENSION AND PUMP KCLALLTHE WAY AROUND - CALL TOWN TEAM AND DISCUSS 1600 - 18:00 2.00 CASING N 13,602.00 RUNPRD DECISION MADE TO SWAP WELL BACK OVER TO MUD, RELEASE FROM LINER AND POOH TO TEST BOPE 18.00 - 18:30 0.50 CASING N 13,602.00 RUNPRD PJSM, REVIEW CON #11 WITH CREW MEMBERS - PERFORM 10 MIN FLOW CHECK. - LOAD AND LAUNCH 3/4" STEEL BALL. - SLOW PUMP RATE FROM 3 BPM TO 1 BPM AT 34 BBLS AWAY. - 47 BBLS AWAY BALL LANDED. INCREASE TRIPS. PRESSURE UP TO 3300# AND SHEARED BALL SEAT. - CIRCULATE AT 0.5 BPM WHILE PULLING OUT OF LINER. GOOD INDICATION OF STINGING OUT CLEAN. 48KBREAKOVER. -ONCE 30' OUT OF LINER. INCREASE RATE TO 2.5 BPM 1830 - 2030 2.00 CASING N 13,602.00 RUNPRD POOH - MUD WEIGHT: 8.67 PPG IN, 8.66 PPG OUT - RATE: _2.51 BPM IN, 2.01 BPM OUT 20:30 - 23:30 3.00 CASING N 13,602.00 RUNPRD MONITOR WELL FOR 10 MINUTES AT BHA: STATIC - INJECTOR OFF: 20:45 -BREAK OFF SWIVEL AND TROLLEY BACK INJECTOR. - LAY DOWN 6 JOINTS OF 2-3/8" BTS -6. - LAY DOWN LINER RUNNING TOOL. RECOVER 3/4" STEEL BALL - WIPER PLUG INACT. -LOSS RATE: 0.5 BBL PER HOUR. CLOSE MASTER VALVE _ 23:30 - 00:00 0.50 BOPSUR P 13,602.00 RUNPRD PREP FOR 14 DAY BOPE TEST - INSTALL TEST RISERS - VALVE CREW GREASED TREE VALVES. - FLUID PACK FOR SHELL TEST AGAINST MASTER VALVE -AOGCC WITNESS WAIVED BYADAM EARL - PERFORM 250 PSI LOW SHELL TEST / BEGIN 3500# HIGH SHELL TEST. Printed 1/28/2019 11:25:06AM **All depths reported in Drillers Depths** Common Well Name: P-04 Event Type'. COM- ONSHORE(CON) Project: PBU North America - ALASKA - BP Page 7 of 13 Operation Summary Report Start Date: 1/4/2019 Ead Date 1/10/2019 Site: P AFE No X3 -0197J -C. (979,713.00 ) Rig Name/No.: CDR -2 Spud Datefrime: 6/11/1991 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) Dale From- To Him Task Code NPT Total Depth Phase Description of Operations (hr) _ _ (usft) 1/6/2019 00:00 - 02:15 2.25 BOPSUR P 13,602.00 RUNPRD BOPE TESTING -3500 PSI SHELL TEST PASSED. - BOPE COMPONENTS ALL TESTED TO 250 LOW/ 3500# HIGH - PERFORM TEST#1: BLINDS, R7, BLIA, Bi, B4 ALLPASSED - INSTALL TEST JOINT FOR 2-3/8" EQUIPMENT -PERFORM TEST#2: ANNULAR (2-318"), TIW#1, B3, B2, BL1 ALL PASSED -PERFORM TEST #3 UPPER 2-3/8" PIPE SLIP, TIW#2, BL2, R2, T2, C15 ALL PASSED '- PERFORM TEST Its: C16, T7, C11 ALL PASSED 02:15 - 0225 0.17 BOPSUR P 13,602.00 RUNPRD FILL HOLE -CLOSE SWAB - LINE UP DOWN MANAGE PRESSURE LINE. - OPEN MASTER VALVE. WELLBORE DEAD. FILL HOLE WITH 1 BBL. _ 02.25 - 0400 1.58 BOPSUR P 13,602.00 RUNPRD BOPE TESTING - PERFORM TEST #5: VARIABLES (2-3/8"), C7, C9, C10, TV2 ALL PASSED - PERFORM TEST #6: LOWER 2-3/8" PIPE / SLIP, C5, C6, C8, TVI ALL PASSED - PERFORM TEST #7: CHOKE A, CHOKE C - PERFORM ACCUMULATOR DRAW DOWN TEST 2950# 12250# 17 SEC TO 200# 147 SEC TO FULL RECOVERY. 0400 - 0500 1.00 BOPSUR P 13,602.00 RUNPRD BOPE TESTING - INSTALL 0.9' SPACER SUB FOR 3.5" TEST ON ANNULAR AND VARIABLES - PURGEAIR OUT OF SYSTEM - PERFORM TEST #8: ANNULAR (3.5"), Cl, C4 ALLPASSED - PERFORM TEST #9: VARIABLES (3.5"), C2, C3 ALLPASSED - OPEN MASTER VALVE. FILL HOLE THROUGH MANAGE PRESSURE LINE (2.1 BBLS)_ _ 05:00 - 06:30 1.50 BOPSUR P 13,602.00 RUNPRD RECONFIGURE RISERS FOR TEST#10 -CHANGE PACKOFFS DUE TO RUNNING FOOTAGE. -PERFORM TEST#10: INNER REELVALVE, PACK OFF, C9 & C10 & LUBRICATORS- ALL PASSED 0630 - 0730 1.00 BOPSUR P 13,602.00 RUNPRD BOP TEST COMPLETED, RD TEST EQUIPMENTAND LINE UP TO OPEN UP TO THE WELLTO CHECKFOR PRESSURE 07:30 - 08:00 0.50 BOPSUR P 13,602.00 RUNPRD OPEN UP TO THE WELL - OPEN SWAB TO A CLOSED CHOKE TO CHECK FOR PRESSURE - NO PRESSURE, OPEN CHOKE, ONLINE WITH PUMP TO ENSURE THE WELL IS FULL TO FLOW CHECK - WELL TOOK 1.2 BBLS, SHUT DOWN PUMP ADN FLOW CHECK WELL - GOOD NO FLOW CHECK - PU INJECTOR AND MOVE BACK Printed 1128/2019 11:25:06AM **All depths reported in Drillers Depths" Common Well Name: P-04 Event Type. COM- ONSHORE (CON) North America - ALASKA - BP Page 8 of 13 Operation Summary Report Start Date: 1/4/2019 End Date: 1/10/2019 AFE No X3 -0197J -C'. (979,713 00 ) Project: PBU Site: P Rig Name/No.: CDR -2 Spud Daterfime: 6/11/1991 12:OO:OOAM Rig Release: Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Him Task Code _ (hr) 08:00 - 13:30 5.50 FISH N 13:30 - 16:40 3.17 FISH N 16:40 - 16:55 0.25 FISH N L_ 16:55 - 17:05 0.17 FISH N 17'.05 - 21:30 4.42 FISH P 21'.30 - 00:00 2.50 FISH N BPUOI: NPT Total Depth Phase Description of Operations (usft) 13,602.00 RUNPRD PREP SAFETY JOINT FOR RUNNING THE FISHING BHA - HOLD A PJSM TO MU THE BHA- REVIEW PROCEDURE AND DISCUSS RED ZONE ,MANAGEMENT -MU FISHING BHA -RIH WITH FISHING BHA W/SEALASSEMBLY -MIX EP MUD LUBE PILL WHILE RIH -AT 10600' VERIFY WE ARE NOT LATCHED ON, PU IS CLEAN AT 47K NO PUMP, 'CONTINUE PUMPING EP MUD LUBE PILL ;- VERIFY RATE FOR PILLAT 2.5 BPM ONCE ITS ON THE BACKSIDE FOR OPTIMAL COATING SEND EP LUBE PILLTO TT 13,602.00 RUNPRD START FISHING OPS - RIH AT 0.5 BPM AT 25 FPM LOOKING FOR PRESSURE INCREASE -TOL AT 0.5 BPM AT 1025 PSI - TAG TOL RIGHT WHERE WE LEFT IT, CORRECT DEPTH -9' TO 12966' - PU AND PULLED LINER FREE AT 77K AND ITS MOVING -61K STRING WF - RIH AT SET DOWN AT 12996, PU AND SET DOWN AT 12988, PU AND CAN'T MOVE - SLACK OFF AND PU SAME PULLING 90K - SLACK TO RIH WF AT 20K AND CIRC 10 BELS AT 2 BPM - PU AND WE ARE STUCK, SLACK OFF TO 70K AND HOLD, WE SEEING THE SAME CHARACTERISTICS WE WERE SEEING YESTERDAY, CALL ODE AND DISCUSS FLUID OPTIONS _ 13,602.00 RUNPRD RECIEVED CON FOR PUMPING CRUDE, MOVE OUT LVT PUPS AND BACK IN CRUDE TRANSPORT 13,602.00 RUNPRD HOLDA PJSM TO PUMP CRUDEAS PER CON _ #12 _ 13,602.00 RUNPRD FLOOD LINES AND PUMP 60 BBLS OF CRUDE - PU TO CHECK LINER AND WE ARE FREE, RIH TILL WE SET DOWN TO KEEP TEH GS IN COMPRESSION - STOPPED AT 12975' -20' OFF BOTTOM - ONLINE WITH 10 BBLS OF KCL FOLLOWED BY 60 BBLS OF CRUDE AND 10 BBLS OF KCL - PUMP 20 BBLS OF CRUDE OUT SHOE. SHUT PUMPS DOWN. RELAX HOLE FOR 20 MIN -POPPED FREE. CHASED DOWN TO 13108', GO INTO COMPRESSION. PUMP 5 BBLS MORE OUT SOAK -PUANDRUNT013132'. SETDOWN. PUA COUPLE TIMES LOSING GROUND PUMP 10 MORE BBLS OUT. - PU AND LOSING GROUND. PUMPANOTHER 10 BBLS OUT. WORK LINER. PUMP ANOTHER 10 BBLS OUT. - PU AND CONTINUE TO WORK LINER. PUMP FINAL 5 BBLS OUT. 13,602.00 RUNPRD DISCUSS OPTIONS WITH ODE. - SWAP TO NEW DRILLING MUD - CIRCULATE CRUDE AND OLD MUD TO TIGER TANK. Printed 1/282019 11:25:OBAM **All depths reported in Drillers Depths" North America - ALASKA - BP Page 9 of 13 Operation Summary Report Common Well Name. P-04 - 1830 2.50 AFE No Event Type: COM- ONSHORE (CON) Start Date. 1/4/2019 End Date: 1/10/2019 X3 -0197J -C: (979,71100) Project: PBU Site: P FISH P Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:00 OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64us8 (above Mean Sea Level) FISH Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations _ (hr) P (usft) 13,602.00 1(//2019 00:00 - 01:00 1.00 FISH N 13,602.00 RUNPRD FINISH MUD SWAP 01:00 - 09:45 6.75 09:45 - 1230 2.75 12:30 - 15:40 3.17 15:40 - 16:00 0.33 16'.00 - 1830 2.50 1830 - 1930 1.00 19:30 - 22:00 2.50 FISH P 13,602.00 RUNPRD 13,602.00 RUNPRD FISH P 1 FISH P 13,602.00 RUNPRD FISH P 13,602.00 RUNPRD FISH F, /hBrG .00 RUNPRD V�'✓, 13,602.00 FISH P RUNPRD CEMT P 13,602.00 RUNPRD Printed 1/28/2019 11:25:06AM **All depths reported in Drillers Depths** 8.62 PPG IN / 8.53 PPG OUT PU TO 87K. LINER PULLED FREE. START WORKING LINER. WORK LINER - RATE: 3.0 BPM IN, 3.0 BPM OUT. CIRC PRESSURE: 3512 PSI - MUD WEIGHT: 8.53 PPG IN, 8.53 PPG OUT -CIRCULATE OPEN HOLE VOLUME IN COMPRESSION. PICKUP AND STARTING TO MOVE FORWARD SLOWLY. CONTINUE WORKING PIPE AND CIRCULATING AT 3 BPM TO SLOWLY GAIN GROUND MOVING LINER. - PUMPA 10 BBL HIGH VIS PILL - PILL DID NOT BRING UP ANYTHING MADE IT DOWN TO 13367' LINE UP TO PUMP A 20 BBL LVT PILL -ONLINE WITH 10 BBLS SPACERS AND 20 BBLS LVT - 5 BBLS OF LVT OUT, ALLOW TO SOAK FOR A FEW MINUTES THEN TRY WORKING PIPE - PU AND RAN IN HOLE TO 13480' AND STOPPED THEN POPPED FREE, RIH TO 13511' AND SET DOWN. - PU TO 13500' FLAG AND VERIFY DEPTH AT 1348966'(l. 3499.37' WHEN IT WAS PAINTED) -STOPPED MAKING HOLE AT 13536', PUMP 5 BBLS OF LVT - STOPPED AT 13568, PU AND WORK DOWN - NOT GETTING ANY DEEPER, CIRC OUT 2 BBLS - NO IMPROVEMENT, CIRC OUT THE LAST 6 BBLS - 11 ATTEMPTS TO GET ANY DEEPER HAS FAILED, CALL ODE AND DISCUSS CIRC OUT LVT LVT CIRCULATED OUT, PU TO 90K AND TO PULL LINER FREE - WORK PIPE FEW TIMESAS DISCUSSED WITH ODE, IF WE DO NOT MAKE ANY PROGRESS, PUMP OFF AND POOH - TAGGING AT 13543, WORK PIPE BACK DOWN TO 13570, PUMP OFF AND POOH - SLID DOWN T TO 13546', ALLOW TIME TO RE _ MADE IT BACK DOWN TO 13569 PUMP OFF LINER AND POOH AT SURFACE. PERFORM 10 MIN FLOW CHECK._ LAY DOWN 6 JOINTS 2-3/8" BTS -6 LAY DOWN G SPEAR. CLEAR RIG FLOOR. - PREP FOR RUNNING 1-1/4" CSH WORKSTRING - INSTALL BOT INTERNAL COIL CONNECTOR. PULLTESTTO40K, PRESSURETESTTO 3500#. -SWAP ALL HANDLING EQUIPMENT TO 1-1/4" North America - ALASKA - BP Operation Summary Report Page 10 of 13 1 Common Well Name. P-04 AFE No Event Type: COM- ONSHORE (CON) Start Date. 1/4/2019 End Date: 1/10/2019 X3 -0197J -C: (979,713.00 ) Project: PBU Site: P Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:0O:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB @91.64usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) _ - (usft) 22:00 - 00:00 2.00 CEMT P 13,602.00 RUNPRD PJSM FOR RUNNING CEMENT RETAINER BHA - MAKE UP WFR FH CEMENT RETAINER - MAKE UP S/8" BALL DISCONNECT TO FIRST JOINT OF 1-1/4" CS - RUN 23 JOINTS OF 1-1/4" CSH WORKSTRING 1/8/2019 00:00 - 03:00 3.00 CEMT P 13,602.00 RUNPRD CEMENT RETAINER ON WORKSTRING -MAKE UP REMAINING 27 JOINTS OF 1-1/4" li CSH HYDRIL WORKSTRING - MAKE UP 6 JOINTS OF 2-1/16 _ -MU SWIVEL 03:00 - 07:00 4.00 CEMT P 13,602.00 RUNPRD BHA MU, RIH AND CALL OUT SLB CMT CREW 11000'WT CK=45K, RIH WT = 20k - CLEAN PASS THROUGH TOL - STOP AT YELLOW FLAG (ORIGINAL DEPTH 10966.63') OUR DEPTH = 10969.5', -3.2' 'CORRECTION - ELEC DEPTH 12753.21' (-26.65' CORRECTION) RIH TO LATCH COLLAR AND CORRECT TO IT -13533' I� t A - 22.5K, RIH TO LIGHTLYG LATCH COLLAR G 1 - TAG LATCH COLLAR AT 13573', PU AND RETAG SAME DEPTH. UP WT AT 13567', PU 20' AS PER OCN FOR SET DEPTH 07:00 - 10:30 3.50 CEMT P 13,602.00 RUNPRD - AT SET DEPTH, LOAD CONFIRMED 1/2" ALUMINUM BALLAND LAUNCH - REDUCE RATE AT 45 BBLS TO ALLOW BALL TO LAND ON SEAT - NO INDICATION OF BALL ON SEAT AT VOLUME, SURGE PUMP A COUPLE TIMES AND CONTINUE PUMPING AT 1.0 BPM - NO INDICATION OF THE BALL LANDING ON SEAT AND SHEARING - WED RECOMMENDS TRY SETTING DOWN WT TO SEE IF THE TOOL IS SET, DISCUSSED WITH ODE AND OK - SET DOWN SK PAST RIH WT, STOPPEDAND WT CAME BACK TO RIH WT, TRY TO SET DOWN WT AGAIN BUT STOPPED AS IT LOOKS LIKE WE ARE PUSHING IT DOWN - PU TO SEE IF WE SEE AN OVER PULL AND PULLED TO 54K (4K OVER) AT 13548.6) 1.6' SHALLOWER CALL ODE AND DISCUSS 10:30 - 14:00 3.50 CEMT P 13,602.00 RUNPRD DECISION MADE TO PUMP 2ND BALL - LOAD AND PUMP 2ND CONFIRMED 1/2" ALUMINUM BALL. -COME ONLINE. PUMP 62 BBLS, BALL LANDED ON SEAT, AND SHEARED AT 3000# TACK 10K ON RETAINER. GOOD SET. - CIRCULATE MUD OUT OF LINER ANNULUS. - SLIP STREAM CEMENTERS KCL FOR PT. PT CEMENTERS TO 250 LOW / 4700# HIGH Printed 1/2811019 11:25:06AM **All depths reported in Drillers Depths** Common Well Name. P-04 Event Type: COM- ONSHORE (CON) North America - ALASKA - BP Operation Summary Report Start Date. 1/4/2019 End Date: 1/10/2019 Page 11 of 13 AFE No K3 -0197J -C: (979,713.00 ) Project: PBU Site: P Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:00 OOAM Rig Release: Active datum: KB @91.64usR (above Mean Sea Level) Date From - To Hrs (hr) 14:00 - 18:00 4.00 BPUOI: USA00001M Task Code NPT Total Depth Phase Description of Operations (usf) _ CEMT P 13,602.00 RUNPRD PERFORM LINER CEMENT JOB - 1.51 BPM IN / 1.51 BPM QHTAT 1317 PSI -CEMENT WE AT 1337 - LOAD 28.5 BBLS OF 15.3 PPG CEMENT. -CHASE WITH 5 BBLS OF HIVIS - FOLLOW WITH 1.5 PPG EXHAUST PILL. :-ZERO OUT MM AND TAKE TO DEDICATED PITAT 61.3 BBLS AWAY (CEMENT AT SHOE) - 1.65 BPM IN / 1.83 SPM OUT AT 2800-3650# yy l V�� LL L r PUMP 26.6 BBLS BEHIND PIPE CEMENT IN 4f 1800 - 21.45 3.75 CEMT P 21'.45 - 0000 2.25 PERF P 1/92019 00'.00 - 0045 00'.45 - 02:45 02.45 - 04:00 0.75 PERF P 2.00 PERF P 1.25 PERF P Printed 1/28/2019 11:25:OSAM **All depths reported in Drillers Depths" PLACE AT 1500 COME OFFLINE. UNSTING FROM CEMENT RETAINER WITH 2 BBLS CEMENT IN COIL - COME ONLINE 3.06 BPM IN / 3.03 BPM OUT AT 3621#. ONCE EXHAUSTED CEMENT ABOVE LINER START Put nNr, o, T nc -- HOLE. -SEEN 10 PPG SLUG OF CEMENTAT VOLUME. CAMEANDGONE. -JET DEPLOYMENT SLEEVE AT 30 FPM. CIRCULATE 2.87 BPM 12.45 BPM OUT 3600# SPOT FRESHWATER IN WORKSTRING 13,602.00 RUNPRD PERFORM 10 MIN FLOWCHECK - INJECTOR OFF AT 18:15 - BREAK AT NS SWIVEL - LAY DOWN 6 JOINTS OF 2-1/16" CSH, XO, 3/4" DISCONNECT, XO - LAY DOWN 50 JOINTS OF I-1/4"CSH - FH RUNNING TOOL (RECOVERED (2) 1/2" ALUMINUM_ BALLS. 13,602.00 OTHCMP PJSM WITH HALUBURTON TCP - LOAD GUNS INTO PIPE SHED. - LOAD HALLIBURTON HANDLING EQUIPMENT TO RIG FLOOR - PUT PERF GUNS IN ORDER SIMOPS: ATTEMPT LINER LAP TEST TO 2400#. CEMENTAT 1000 PSI COMPRESSIVE AT 20:39 - STARTED INJECTING AT 1600#. - CONTINUED TO RIG FLOOR UP WITH HES EQUIPMENT 13,602.00 OTHCMP CREW HANDOVER - PJSM WITH TCP. 13,602.00 OTHCMP MAKE UP 2" MAXFORCE 6 SPF PERF GUNS (59 GUNS) INSTALL SAFETY JOINT SWAP ELEVATORS TO 1-1/4" _ PROGRAM FIRING _HEAD 13,602.00 OTHCMP M/U FIRING HEADAND 5/8" DISCONNECT. M/U 13 JTS OF 1-1/4" CSH AND 2 JTS 2-1/16" CSH. M/U SWIVELAND INJECTOR TO WELL. TEST QTS TO 3,500 PSI, GOOD. Printed 1/28/2019 11:25:OSAM **All depths reported in Drillers Depths" Common Well Name: P-04 Event Type: COM- ONSHORE (CON) Project: PBU Rig Name/No.: CDR -2 North America - ALASKA - BP Page 12 of 13 Operation Summary Report AFE No Start Date: 1/4/2019 End Date: 1/10/2019 X3 -0197J -C'. (979,713 00 ) Site: P Active datum: KB Q91.64usft (above Mean Sea Level) Date From - To Hrs Task Code (hr) 0400 - 0730 3.50 PERF P 07:30 - 08:15 0.75 08:15 - 08:40 0.42 0840 - 0950 1.17 PERF P PERF P .i PERF P 09'.50 - 1220 2.50 PERF T P 1220 - 1330 1.17 PERF P BPUOI: USA00001646 NPT Total Depth Phase Description of Operations (us(t) 13,602.00 OTHCMP RIH WITH PERF BHA#13. UP WEIGHT AT 11,000' IS 47K. RIH PAST LINER TOP SLOWLY, NOTHING SEEN. LIGHT TAG AT 13,554' UNCORRECTED. PICK UP AND REPEAT, SAME DEPTH. DEPTH IS CONSISTENT WITH PREVIOUS DRILLING CORRECTIONS WITH RETAINER BEING AT 13,548.61. CORRECT DEPTH TO 13,548.6'. UP Wf IS 53K. _ 13,602.00 OTHCMP WAIT FOR FIRING HEAD TO TURN ON, PROGRAMMED FOR 08:15. 13,602.00 OTHCMP ''START PRESSUREAND MOTION SEQUENCE TO ACTIVATE FIRING HEAD. AFTER FINAL MOTION MOVE TO SHOT DEPTH AND WAIT. KEEP 150 PSI WHPAS INDICATOR FOR GUNS FIRING. 13,602.00 OTHCMP GOOD SHOT INDICATION FROM ACOUSTICS AND FLUID LOSS. POOH. INCREASE PUMP RATE TO 3 BPM, START .NEW KCL DOWN CT. HOLD 250 PSI WHP WHILE PERF GUNS ARE INSIDE LINER. PERFORATED INTERVALS: 12,410' -12,586- 12,765- - 12,793- 12,855' -12,955- 12,955'13,100' 13,100- -13,315'13,350'-13,460'13,602.00 OTHCMP ABOVE LINER TOP BLEED OFF WHIP, 10 MIN FLOW CHECK IS GOOD. CONTINUE POOH. SWAPTO GEN POWER WHILE POOH SO HIGHLINE POWER CABLE CAN BE RIGGED DOWN. 13,602.00 OTHCMP ABOUT 300' FT FROM SURFACE TAKE RETURNS TO TIGER TANK PULL UP TO 100' THEN BACK TO 1500' JOG TAKING RETURNS OUTSIDE. AT SURFACE, 10 MIN FLOWCHECK IS GOOD. CONDUCT PJSM WITH HES AND NABORS CREW FOR LAYING DOWN CSN AND PERF Printed 12812019 11:25:06AM **All depths reported in Drillers Depths" North America - ALASKA- BP Page 13 of 13 Operation Summary Report Common Well Name: P-04 AFE No Event Type: COM- ONSHORE (CON) Start Dale'. 1/4/2019 End Date: 1/10/2019 X3 -0197J -C: (979,713.00 ) Project: PBU Site: P Rig Name/No.: CDR -2 Spud Date/Time: 6/11/1991 12:0000AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001646 Active datum: KB Q91.64usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 13:30 - 19:00 5.50 PERF P 13,602.00 OTHCMP SLIDE INJECTOR BACK, 19:00 - 19:15 0.25 CONDHL P 1915 - 0000 4.75 RIGID P 1/10/2019 00:00 - 06:00 6.00 RIGID 0600 - 1000 4.00 RIGD P P Printed 1/2612019 11:25'.06AM "'All depths reported in Drillers Depths" UD 2 JOINTS OF 2-1/16" CSH. AT FIRST JOINT OF 1-1/4" CSH, CONDUCT D1 DRILL WITH BEARD CREW. JOINT OF 2-1/16" IS ON THE SKATE, ROLL IT OFF AND BRING SAFETY JOINT TO FLOOR. TORQUE UP SAFETY JOINT, RUN INTO WELL AND SIMULATE SHUTTING WELL IN. WELL SECURED IN 7 MIN. CONTINUE UD 1-1/4 CSH. INSTALL SAFETY JOINT AFTER LAST 1-1/4" IS UD TO CHANGE ELEVATORS FOR PERF GUNS. CONTINUE UD ALL PERF GUNS. ALL SHOTS FIRED. OOH WITH GUNS. CLEAN AND CLEAR RIG FLOOR OF HANDLING _EQUIPMENT. 13,602.00 OTHCMP INJECTIVITYTEST - 1.0 BPM AT 1600# FOR 15 BBLS OF 1% KCL - DISCUSS WITH ODE ON OPTIONS TO KEEP _ FREEZE PROTECT OFF CRITICAL PATH. 13,602.00 OTHCMP END OF WELL OPS -REVERSE CIRCULATE E -LINE BACK WHILE DISPLACING TO FRESHWATER. -PERFORM PACKOFF, IRV, C9/C10 BACKWARDS TEST. 250 LOW/ 3500# HIGH ALLPASSED - RIG UP COIL CUTTER, CUT 280' COIL. DRESSCOIL. INSTALL COIL CONNECTOR. PULL TEST CONNECTOR TO 50K, GOOD TEST. 13,502.00 POST PJSM, -MAKEUP NOZZLE AND STINGER. PUMP E -LINE FORWARD -JET STACK WHILE PUMPING VOLUME FORWARD. - INSTALL NIGHT CAP FOR BLOW DOWN. FLUID PACK. LTT TO 3500# - BHI MAKING UP UQC W/ FLOATS. PT UQC AND CTC TO 4200# GOOD TEST. -START BIG BOY COMPRESSOR, START BLOWING DOWN RIG. - NIPPLE DOWN MPD LINE. - RIG UP TO TEST FLOATS. TEST FLOATS TO 4200# GOOD TEST - SIMOPS: RIG UP LRS ON TANGO VALVES. FREEZE PROTECT WELL WITH 35 BBLS OF 90° DIESELAND 3 BBL METHANOL CAP WHILE _ BLOWING DOWN REEL. 0.8 BPM @ 1950#. 13,602.00 POST GREASE CREW SERVICE TREE VALVES. GET GOOD LTT ON SWAB AND MASTER VALVES, THEN CLOSE SSV. REMOVE BOPS, INSTALL TREE CAP. TEST TREE CAP TO 3500#. "`RIG RELEASED AT 10:00•'• Printed 1/2612019 11:25'.06AM "'All depths reported in Drillers Depths" Continued from day shift. T/I/0= 0/0/0 Post CDR2. Barriers MV & SV. Verified by performing independent LTT. Macnical issues with truck. Job on hold. Job Continued on 1/10/2019 1/11/2019 T/1/0= 0/0/0 POST CDR2. Continued from 1/10/2019. R/U CIW Lubricator 840 W/ 4" H plug and tool. PT'd lubricator Low 300psi, High 3500psi. Set TWC # 296 @ 125 top of window. Good set. R/D lubricator & swapped over to pulling tool & R/U lubricator. Torqued Tree with no movement on any studs. PT'd Tree low 300psi, Hight 5000psi. (Passed). Pulled TWC # 296 @ 125 top of window. Installed tree cap & PT'd to 500psi. RDMO 1/11/2019 "'Job Complete"` FWHP= 0/0/0 "'WELL FOUND S/I ON ARRIVAL"' DRIFTED TO DEVIATION @ 11,615' SLM w/ 2.51" CENT, AND 1.75" S-BLR. RAN PDS JEWELRY LOG FROM 11,350' SLM TO SURFACE. 1/20/2019 '"WSR CONTINUED ON 1/21/19"' T/I/0= VacNacNac Temp= S/I Assist SSL (CTD) Pumped 14 bbls crude down TBG, 1/21/2019 "`WSR Continued on 01-22-19"' '"WSR CONTINUED FROM 1/20/19'•` (ctd) SET 4-1/2" WHIDDON CATCHER AT 11245' SLM. PULLED STA#4 BK-DGLV FROM 6765' MD PULLED STA#5 BK-DGLV FROM 3110' MD SET STA#5 BK-LGLV AT 3110' MD. SET STA#4 BK-DGLV AT 6765' MD. PULLED 4-1/2" WHIDDON CATCHER FROM 11245' SLM. RAN DUMMY 3.70" 45 KB LNR TOP PKR, 2' SPACER PUP, DMY PTSA TO 11,270' MD. (Unable to get full penetration) RAN 4-1/2" BRUSH TO BRUSH LTP @ 11,270MD. RAN DUMMY 3.70" 45 KB LNR TOP PKR, 2' SPACER PUP, DMY PTSA TO 11,270' MD. (Unable to get full penetration) RAN 4-1/2" BRUSH TO BRUSH LTP @ 11,270' MD WHILE PUMPING. 1/21/2019 "'WSR CONTINUED ON 1/22/19"' "'WSR CONTINUED FROM 1/21/19"' (ctd) SUCCESSFUL DRIFT TO 11237' SLM W/ 3.70" LTP DRIFT. \K .X SET 45 KB LNR TOP PACKER W/ ' 11261' MD) j Q' `-( %t"* PSI (PASS). V aC/ Q1/22/2019 PULL 2-7/8" XX PLUG FROM LTPAT 11237' SLM. (11274' md) "`WELL TURNED OVER TO DSO'" "'WSR Continued from 01-21-19"' Temp= S/I Assist SSL MIT-T '"PASS'" @ 2311. Max applied 2400, target 2160. Pumped 5 bbls crude down TBG to assist SSL, Pumped 4.92 bbis to reach test pressure. 1 st 15 min lost 54 psi. 2nd 15 min lost 25 psi. Total loss 1/22/2019 of 79 psi. Bled back --1.9 bbis. Hang tags. FWHP's 290/0/0. SLB on well upon departure. by North America - ALASKA - BP PBU P P-04 P -04A 500292218001 Design:P-04A Final Survey Report 08 January, 2019 F I Company: North America - ALASKA - BP Project: PBU Site: P Well: P-04 Wellbore: P -04A Design: P -04A BP Final Survey Report Local Co-ordinate Reference: Well P-04 TVD Reference: KB @ 91.64usft (P -04A) MD Reference: KB @ 91.64usft (P -04A) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Protect PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Usa AK [4267'15864) Using Well Reference Point Map Zone: NAD27 •OGP-Usa AK / Alaska zone 4 [26734.1586, Using geodetic scale factor site P, TR -11-13 Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 usft Slot Radius: j Well _ - - P-04, P-04 Well Position +N/ -S 0.00 usft Northing: •E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore P -04A Magnetics Model Name Sample Date Declination 1°) BGGM2018 12/1/2018 17.02 Design P -04A Audit Notes: Version: Phase: ACTUAL Vertical Section: Depth From (TVD) -N/-S (usft) (usft) 3784 000 5,949,377.170 usft 623,154.060 usft 0.000 in 5,947,292.220 usft 631,283.590 usft 53.80 usft Latitude: 70' 16' 12.612 N Longitude: 149° 0' 14.402 W Grid Convergence: 0.94 ° Latitude: 70° 15'50.757 N Longitude: 148° 56'18,821 W Ground Level: 53.80 usft Dip Angle Field Strength (nT) 80.90 57,437 Tie On Depth: 11,515.29 .FJ -W Direction (usft) (°) 0 00 107 31 182019 12:45:34PM Page 2 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well P-04 Project: PBU TVDSS NIS TVD Reference: KB @ 91.64usft (P -04A) Site: P Easting DLeg MD Reference: KB @ 91.64usft (P -04A) Well: P-04 (°) (usft) North Reference: True Wellbom: P -04A (usft) Survey Calculation Method: Minimum Curvature Design: P -04A 0.00 Database: EDM RSK- Alaska PROD -ANCPI Survey Program Date 1/7/2019 0.00 5,947,292.220 From To 50.30 0.17 (usft) (usft) Survey (Wellbore) Tool Name Description -0.02 50.30 11,515.29 P-04 Srvy 1 GCT -MS (P-04) GCT -MS Schlumberger GCT multishot 65.50 11,517.00 13,602.00 Survey #1 (P -04A) MWD MWD - Standard -26.14 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EMI Northing Easting DLeg (usft) (") (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) 37.84 0.00 0.00 37.84 -53.80 0.00 0.00 5,947,292.220 631,283.590 0.00 50.30 0.17 299.44 50.30 .41.34 0.01 -0.02 5,947,292.229 631,283.574 1.36 65.50 0.17 31467 65.50 -26.14 0.04 -0.05 5,947,292.255 631,283.538 0.30 81.00 0.15 314.06 8100 -10.64 0.07 -0.08 5,947,292.285 631,283.506 0.13 96.40 0.17 317.27 96.40 4.76 0.10 -0.11 5,947,292.315 631,283.476 0.14 111.80 0.20 319.80 111.80 20.16 0.13 -0.15 5,947,292.352 631,283.442 0.20 127.20 0.20 327.08 127.20 35.56 0.18 -0.18 5,947,292.394 631,283.409 0.16 142.60 0.22 324.82 142.60 50.96 0.22 -021 5,947,292.441 631,283.377 0.14 158.05 0.20 315.27 158.05 66.41 0.27 -0.25 5,947,292.483 631,283.340 0.26 173.60 0.17 313.25 173.60 81.96 0.30 -0.28 5,947,292.518 631,263.304 0.20 189.10 0.13 312.46 189.10 97.46 0.33 -0.31 5,947,292.545 631,283.273 0.26 204.85 0.13 310.83 204.85 113.21 0.35 434 5,947,292.568 631,283.246 0.02 220.80 0.12 303.61 220.80 129.16 0.38 -0.37 5,947,292.589 631,283.218 0.12 236.75 0.10 292.70 236.75 145.11 0.39 -0.39 5,947,292.603 631,283.191 0.18 252.95 0.05 286.41 252.95 161.31 0.40 -0.41 5,947,292.610 631,283.171 0.31 269.05 0.02 317.06 269.05 177.41 040 -0.42 5,947,292.614 631,283.163 0.21 285.25 0.03 359.83 285.25 193.61 0.41 -0.42 5,947,292.620 631,283.161 0.13 301.45 0.07 12.86 301.45 209.81 0.42 -0.42 5,947,292.634 631,283.163 0.25 317.65 0.10 8.16 317.65 226.01 0.45 -0.42 5,947,292.658 631,283.168 0.19 334.05 0.12 358.17 334.05 242.41 0.48 -0.41 5,947,292.689 631,283.167 0.17 350.15 0.13 345.87 350.15 258.51 0.51 -0.42 5,947,292.724 631,283.162 0.18 V. Sec (usft) 0.00 -0.02 -0.06 -0.10 -0.14 -0.18 -0.22 -0.27 -0.31 -0.36 _ -0.40 -0.43 -0.46 -0.49 -0 51 -0.52 -0.52 -0.53 -053 -0.54 -055 1/8/2019 12:45:34PM Page 3 COMPASS 5000.1 Build BID BP Final Survey Report Company: North America- ALASKA - BP Local Coordinate Reference: Well P-04 Project: Pau TVD Reference: KB @ 91.64usft (P -04A) Site: P MD Reference: KB (d 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCPI Survey SIIMD Inc Aid(ssimuth) TVD TVDSS NIS EMI Northing Easting DLeg V. Sec (usm 0 P) (us8) (usR) (usft) (usft) (usR) (usf) ('1100usft) (usi 366.55 0.15 330.41 366.55 274.91 0.55 -0.43 5,947,292.760 631,283.146 0.26 -0.58 382.70 0.13 319.19 382.70 291.06 0.58 -0.46 5,947,292.792 631,283.123 0.21 -0.61 398.75 0.13 313.13 398.75 307.11 0.61 -0.48 5,947,292.818 631,283.097 0.09 -0.64 414.95 0.12 303.27 414.95 323.31 0.63 -0.51 5,947,292.839 631,283.069 0.15 -0.67 431.15 0.12 286.48 431.15 339.51 0.64 -0.54 5,947,292.853 631,283.039 0.22 -0.71 447.15 0.12 274.91 447.15 355.51 0.65 -0.57 5,947,292.858 631,283.006 0.15 -0.74 462.95 0.08 264.24 462.95 371.31 0.65 -0.60 5,947,292.856 631,282.978 0.28 -0.77 478.95 0.07 237.21 478.95 387.31 0.84 -0.62 5,947,292.851 631,282.959 0.23 -0.78 494.85 0.07 213.37 494.85 403.21 0.63 -0.63 5,947,292.838 631,282.946 0.18 -0.79 510.55 0.08 200.31 510.55 418.91 0.61 -0.64 5,947,292.819 631,282.937 0.13 -0.79 526.25 0.08 180.10 526.25 434.61 0.59 -0.65 5,947,292.798 631,282.934 0.18 -0.79 542.15 0.08 160.05 542.15 450.51 0.57 -0.64 5,947,292.777 631,282.938 0.18 -0.78 558.25 0.08 148.49 558.25 466.61 0.55 -0.63 5,947,292.757 631,282.948 0.10 -0.77 574.25 0.10 141.14 574.25 482.61 0.53 -0.62 5,947,292.736 631,282.963 0.14 -075 590.25 0.10 132.59 590.25 498.61 051 -0.60 5,947,292.716 631,282.982 0.09 -0.72 606.25 0.10 128.66 606.25 514.61 0.49 -0.58 5,947,292.699 631,283.004 0.04 -0.70 622.10 0.08 127.20 622.10 530.46 0.47 -0.56 5,947,292.684 631,283.024 0.13 -0.67 638.00 0.10 120.92 638.00 546.36 0.46 -0.54 5,947,292.670 631,283.045 0.14 -0.65 653.95 0.12 118.70 653.95 562.31 0.44 -0.51 5,947,292.655 631,283.071 0.13 -0.62 670.00 0.12 119.26 670.00 578.36 0.43 -0.48 5,947,292.640 631,283.101 0.01 -0.59 686.00 0.12 118.36 686.00 594.36 0.41 -0.45 5,947,292.624 631,283.131 0.01 -055 701.90 0.12 117.36 701.90 610.26 0.40 -0.42 5,947,292.609 631,283.160 0.01 -0.52 717.90 0.12 117.92 717.90 626.26 0.38 -0.39 5,947,292.594 631,283.190 0.01 -0.49 733.90 0.12 119.48 733.90 642.26 0.36 -0.36 5,947,292.578 631,283.220 0.02 -0.46 750.00 0.12 120.55 750.00 658.36 0.35 -0.33 5,947,292.562 631,283.250 0.01 -0.42 766.05 0.12 119.70 766.05 674.41 0.33 -0.31 5,947,292.546 631,283.279 0.01 -0.39 782.10 0.12 116.76 782.10 690.46 0.32 -0.28 5,947,292.530 631,283.309 0.04 -0.36 1/82019 12:45:34PM Page 4 COMPASS 5000.1 Build BID an BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference:Well P-04 Project: PBU TVD Reference: KB @ 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCPI Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DI-eg (usft) (°) (°) (usft) (usft( (usft) (usft) (usft) (usft) (°/100usft) 798.20 0.12 114.88 798.20 706.56 0.30 -0.25 5,947,292.516 631,283.339 0.02 814.25 0.10 110.32 814.25 722.61 0.29 -0.22 5,947,292.505 631,283.368 0.14 830.30 0.10 101.85 830.30 738.66 0.28 -0.19 5,947,292.497 631,283.395 0.09 846.40 0.08 97.76 846.40 754.76 0.28 -0.17 5,947,292.493 631,283.420 0.13 862.55 0.08 99.64 862.55 770.91 0.27 -0.14 5,947,292490 631,283.442 0.02 878.60 0.07 93.22 878.60 786.96 0.27 -0.12 5,947,292.488 631,283.463 0.08 894.70 0.07 73.90 894.70 803.06 0.27 -0.10 5,947,292.491 631,283.482 0.15 910.80 0.07 62.71 910.80 819.16 0.28 -0.08 5,947,292.498 631,283.500 0.08 926.90 0.07 64.53 926.90 835.26 0.29 -0.07 5,947,292.508 631,283.518 0.01 942.90 0.07 58.34 942.90 851.26 0.30 -0.05 5,947,292.517 631,283.535 0.05 958.90 0.07 49.11 956.90 867.26 0.31 -0.03 5,947,292.529 631,283.550 0.07 975.00 0.07 45.99 975.00 883.36 0.32 -0.02 5,947,292.542 631,283.565 0.02 991.15 0.07 39.06 991.15 899.51 0.34 -0.01 5,947,292.557 631,283.578 0.05 1,007.30 0.05 33.91 1,007.30 915.66 0.35 0.00 5,947,292.571 631,283.588 0.13 1,023.45 0.05 36.72 1,023.45 931.81 0.36 0.01 5,947,292.583 631,283.595 0.02 1,039.50 0.03 42.67 1,039.50 947.86 0.37 0.02 5,947,292.591 631,283.602 0.13 1,055.60 0.02 81.87 1,055.60 963.96 0.37 0.02 5,947,292.595 631,283.608 0.12 1,071.90 0.02 130.49 1,071.90 980.26 0.37 0.03 5,947,292.594 631,283.613 0.10 1,088.10 0.02 159.40 1,088.10 996.46 0.37 0.03 5,947,292.589 631,283.616 0.06 1,104.30 0.05 183.70 1,104.30 1,012.66 0.36 0.03 5,947,292.579 631,283.617 0.20 1,120.50 0.08 184.12 1,120.50 1,028.86 0.34 0.03 5,947,292.561 631,283.616 0.19 1,136.60 0.10 179.24 1,136.60 1,044.96 0.32 0.03 5,947,292.536 631,283.616 0.13 1,152.75 0.12 184.11 1,152.75 1,061.11 0.28 0.03 5,947,292.505 631,283.615 0.14 1,168.70 0.15 187.61 1,168.70 1,077.06 0.25 0.03 5,947,292.467 631,283.612 0.19 1,184.70 0.18 188.13 1,184.70 1,093.06 0.20 0.02 5,947,292.422 631,283.606 0.19 1,200.50 0.22 186.92 1,200.50 1,108.86 0.15 0.01 5,947,292.367 631,283.600 0.25 1,216.60 0.25 186.66 1,216.60 1,124.96 0.08 0.00 5,947,292.301 631,283.594 0.19 V. Sec (usft) -0.32 -0.29 -0.27 -0.24 -0.22 -0.20 -0.18 -0.16 -0.15 -0.14 -0.12 -0.11 -0.11 -0.10 -0.10 -0.09 -0.09 -0.08 -0.08 -0.08 -0.07 -0.06 -0.06 -0.05 -0.04 -0 03 -0.02 1/8/2019 12:45: 34PM Page 5 COMPASS 5000.1 Build 81D r z BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well P-04 Project: PBU TVD Reference: KB @ 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) 1,232.60 0.25 187.25 1,232.60 1,140.96 001 0.00 5,947,292.232 631,283.586 0.02 1,248.30 0.27 187.07 1,248.30 1,156.66 -0.06 -0.01 5,947,292.161 631,283.579 0.13 1,264.20 0.28 187.52 1,264.20 1,172.56 -0.13 -0.02 5,947,292.085 631,283.570 0.06 1,280.10 0.30 18547 1,280.10 1,188.46 -0.21 -0.03 5,947,292.005 631,283.563 0.14 1,296.00 0.32 182.11 1,296.00 1,204.36 -0.30 -0.04 5,947,291.919 631,283.559 0.17 1,312.00 0.32 179.51 1,312.00 1,220.36 -0.39 -0.04 5,947,291.830 631,283.559 0.09 1,328.00 0.32 176.58 1,328.00 1,236.36 -0.48 -0.03 5,947,291.741 631,283.563 0.10 1,343.90 0.33 173.28 1,343.90 1,252.26 -0.57 -0.03 5,947,291.651 631,283.573 0.13 1,359.80 0.33 170.23 1,359.80 1,268.16 -0.66 -0.01 5,947,291.561 631,283.586 0.11 1,375.70 0.35 167.65 1,375.70 1,284.06 -0.75 0.00 5,947,291.468 631,283.607 0.16 1,391.60 0.33 158.46 1,391.60 1,299.96 -0.84 0.03 5,947,291.379 631,283.636 0.36 1,407.50 0.30 146.63 1,407.49 1,315.85 -0,92 0.07 5,947,291.301 631,283.676 0.39 1,423.50 0.27 142.81 1,423A9 1,331.65 -099 0.11 5,947,291.236 631,283.722 0.26 1,439.50 0.25 136.79 1,439.49 1,347.85 -1.04 0.16 5,947,291.182 631,283.769 0.21 1,455.35 0.22 132.43 1,455.34 1,363.70 -1.09 0.21 5,947,291.137 631,283.816 0.22 1,471.20 0.20 129.33 1,471.19 1,379.55 -1.13 0.25 5,947,291.100 631,283.861 0.15 1,487.10 0.18 124.74 1,487.09 1,395.45 -1.16 0.29 5,947,291.069 631,283.903 0.16 1,503.10 0.15 118.15 1,503.09 1,411.45 -1.18 0.33 5,947,291.045 631,283.943 0.22 1,518.50 0.13 109.41 1,518A9 1,426.85 -1.20 0.37 5,947,291.030 631,283.977 0.19 1,533.50 0.12 102.49 1,533.49 1,441.85 -1.21 0.40 5,947,291.022 631,284.009 0.12 1,548.10 0.12 99.49 1,548.09 1,456.45 -1.21 0.43 5,947,291.016 631,284.039 0.04 1,562.30 0.10 91.02 1,562.29 1,470.65 -1.21 0.46 5,947,291.014 631,284.066 0.18 1,576.45 0.07 70.73 1,576.44 1,484.80 -1.21 0.48 5,947,291.017 631,284.087 0.30 1,590.60 0.07 56.38 1,590.59 1,498.95 -1.20 0.49 5,947,291.025 631,284.102 0.12 1,604.70 0.07 51.51 1,604.69 1,513.05 -1.19 0.50 5,947,291.036 631,284.116 0.04 1,618.70 0.08 47.81 1,618.69 1,527.05 -1.18 0.52 5,947,291.048 631,284.129 0.08 1,632.85 0.10 55.89 1,632.84 1,541.20 -1.17 0.54 5,947,291.062 631,284.147 0.17 V. Sec (usft) -001 0.01 0.02 0.03 0.05 008 0.11 0.14 0.18 023 0.26 0.34 0,40 0.46 0.52 0.57 0.62 0.67 071 0.74 077 0.80 0.81 0.83 084 0.85 0.86 1/8/2019 12:45: 34PM Page 6 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well P-04 Project: PBU TVD Reference: KB @ 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (Wousft) 1,646.95 0.18 69.70 1,646.94 1,555.30 -1.15 0.57 5,947,291.077 631,284.177 0.61 1,661.00 0.35 81.51 1,660.99 1,569.35 -1.14 0.63 5,947,291.092 631,284.240 1.26 1,675.15 0.55 89.70 1,675.14 1,583.50 -1.13 0.74 5,947,291.100 631,284.351 1.48 1,689.25 0.80 96.66 1,689.24 1,597.60 -1.14 0.91 5,947,291.092 631,284.516 1.86 1,703.30 1.17 103.61 1,703.29 1,611.65 -1.19 1.14 5,947,291.051 631,284.754 2.76 1,717.40 1.47 105.96 1,717.39 1,625.75 -1.27 1.46 5,947,290.973 631,285.069 2.16 1,731.50 1.77 106.82 1,731.48 1,639.84 -1.39 1.84 5,947,290.867 631,285.453 2.13 1,745.50 2.10 107.78 1,745.47 1,653.83 -1.53 2.29 5,947,290.734 631,285.907 2.37 1,759.60 2.40 108.42 1,759.56 1,667.92 -1.70 2.82 5,947,290.571 631,286.436 2.14 1,773.65 2.75 109.49 1,773.60 1,681.96 -1.90 3.41 5,947,290.376 631,287.036 2.51 1,787.70 3.15 110.76 1,787.63 1,695.99 -2.15 4.09 5,947,290.139 631,287.719 2.88 1,801.80 3.47 111.55 1,801.71 1,710.07 -2.45 4.85 5,947,289.858 631,288.483 2.29 1,815.85 3.93 112.16 1,815.73 1,724.09 -2.78 5.69 5,947,289.535 631,289.330 3.29 1,827.90 4.40 112.63 1,827.74 1,736.10 -3.12 6.50 5,947,289.216 631,290.145 3.91 1,837.60 4.57 112.79 1,837.41 174577 -341 7.20 5,947,288.935 631,290.850 1.76 1,856.10 5.13 113.34 1,855.85 1764.21 -4.02 8.64 5,947,288.347 631,292.299 3.04 1,875.65 5.78 113.65 1,875.31 1,783.67 -4.77 10.34 5,947,287.636 631,294.016 3.33 1,899.00 6.45 113.52 1,898.53 1,806.89 -5.76 12.62 5,947,286.681 631,296.312 2.87 1,924.70 7.12 112.86 1,924.05 1,832.41 -6.96 15.42 5,947,285.535 631,299.123 2.62 1,950.10 7.65 112.00 1,949.24 1,857.60 -8.20 18.43 5,947,284.343 631,302.163 2.13 1,975.20 8.22 110.96 1,974.10 1,882.46 -9.47 21.66 5,947,283.132 631,305.409 2.34 2,000.90 9.02 109.76 1,999.50 1,907.86 -10.81 25.27 5,947,281.857 631,309.043 3.19 2,026.80 9.85 109.13 2,025.05 1,933.41 -12.22 29.27 5,947,280.514 631,313.070 3.23 2,052.75 10.60 108.64 2,050.59 1,958.95 -13.71 33.63 5,947,279.100 631,317.454 2.91 2,078.70 11.40 108.14 2,076.06 1,98442 -15.27 38.33 5,947,277.621 631,322.179 3.10 2,104.60 12.23 107.80 2,101.42 2,009.78 -16.91 43.38 5,947,276.074 631,327.251 3.22 2,130.60 12.98 107.20 2,126.79 2,035.15 -18.61 48.79 5,947,274.463 631,332.691 2.93 0.88 0.94 1.04 1.21 1.45 1.77 2.17 2.64 3.19 3.83 4.55 5.36 6.26 7.14 7.89 945 11.29 13.77 16.79 20.04 23.49 27.34 31.58 36.19 41.14 46.44 52.12 1/82019 12:45:34PM Page 7 COMPASS 5000.1 Build BID lim BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well P-04 Project: Pau TVD Reference: KB 91.64usft (P -04A) Site: P MD Reference: KB 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (waft) (usft) (usft) (Woueft) Wait) 2,156.55 13.68 106.55 2,152.04 2,060.40 -20.35 54.51 5,947,272.828 631,338.445 2.76 58.10 2,182.60 14.45 106.21 2,177.31 2,085.67 -22.13 60.59 5,947,271.149 631,344.549 2.97 6443 2,208.60 15.10 106.15 2,202.45 2,110.81 -23.98 66.95 5,947,269.413 631,350.947 2.50 71.06 2,234.70 1543 106.28 2,227.63 2,135.99 -25.90 73.55 5,947,267.610 631,357.578 1.27 77.93 2,260.80 15.70 106.60 2,25277 2,161.13 -27.88 80.27 5,947,265.745 631,364.328 1.09 84.93 2,286.90 16.18 107.47 2,277.87 2,18623 -29.98 87.12 5,947,263.765 631,371.216 2.05 92.10 2,313.10 16.88 108.61 2,302.98 2,211.34 -32.29 94.21 5,947,261.579 631,378.341 2.94 99.55 2,339.30 17.67 109.50 2,328.00 2,236.38 -34.83 101.56 5,947,259.166 631,385.737 3.18 107.33 2,365.40 18.48 110.15 2,352.81 2,261.17 -37.58 109.18 5,947,256.553 631,393.401 3.20 115.42 2,391.60 19.33 110.27 2,377.60 2,285.96 40.51 117.15 5,947,253.759 631,401.416 3.25 123.89 2,417.50 20.08 109.86 2,401.98 2,310.34 43.51 125.35 5,947,250.908 631,409.669 2.94 132.62 2,443.50 20.88 109.18 2,426.34 2,33470 46.55 133.92 5,947,248.019 631,418294 3.21 141.71 2,469.50 21.73 108.21 2,450.56 2,358.92 -49.57 142.87 5,947,245.150 631,427.293 3.54 151.15 2,495.80 22.45 107.40 2,474.93 2,383.29 -52.60 152.29 5,947,242.291 631,436.761 2.97 161.04 2,522.10 23.07 107.14 2,499.18 2,407.54 -55.62 162.01 5,947,239.441 631,446.527 2.39 171.22 2,548.30 23.67 107.06 2,523.24 2,431.60 -58.67 171.94 5,947,236.559 631,456.511 2.29 181.61 2,574.50 24.23 106.76 2,547.18 2,455.54 -61.77 182.11 5,947,233.644 631,466.739 2.19 192.24 2,599.70 24.72 106.34 2,570.11 2,478.47 -64.74 192.12 5,947,230.846 631,476.796 2.06 202.88 2,623.80 25.20 105.88 2,591.96 2,500.32 -67.56 201.89 5,947,228.195 631,486.613 2.15 212.85 2,648.25 25.72 105.43 2,614.04 2,522.40 -70.40 212.01 5,947,225.536 631,498.781 2.27 223.36 2,672.25 26.17 105.19 2,635.62 2,543.98 -73.17 222.14 5,947,222.941 631,506.955 1.93 233.85 2,695.90 28.45 105.18 2,656.82 2,565.18 -75.91 232.26 5,947,220.373 631,517.117 1.18 244.33 2,719.60 26.82 105.33 2,678.02 2,586.38 -78.70 242.47 5,947,217.766 631,527.378 0.77 254.91 2,743.70 26.67 105.66 2,699.56 2,607.92 -81.59 252.89 5,947,215.060 631,537.840 0.65 265.71 2,767.90 26.72 105.94 2,721.19 2,629.55 -84.55 263.35 5,947,212.283 631,548.351 0.56 276.58 2,792.00 26.85 106.00 2,742.70 2,651.06 -87.54 273.79 5,947,209.478 631,558.842 0.55 287.43 2,816.10 27.13 106.23 2,764.17 2,672.53 -90.57 284.30 5,947,206.626 631,569.400 1.24 298.37 1,8/2019 12'45'34PM Page 8 COMPASS 5000.1 Build 81D BP by Final Survey Report Company: North Amenca- ALASKA - BP Local Coordinate Reference: Well P-04 Project: PBU TVD Reference: KB 91.64usft (P -04A) Site: P MD Reference: KB 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 2,840.30 27.80 106.62 2,785.65 2,694.01 -93.73 295.00 5,947,203.657 631580.158 2.87 309.53 2,864.30 28.88 108.83 2,806.77 2,715.13 -97.01 305.91 5,947,200.569 631,591.123 4.52 320.92 2,888.20 30.12 106.60 2,827.57 2,735.93 -100.39 317.18 5,947,197.382 631,602.451 5.21 332.69 2,912.20 31.47 105.96 2,848.19 2,756.55 -103.83 328.98 5,947,194.145 631,614.303 5.79 344.97 2,936.25 33.07 105.13 2,868.52 2,776.88 -107.27 341.35 5,947,190.923 631,626.730 6.90 357.81 2,960.20 34.40 104.39 2,888.44 2,796.80 -110.66 354.21 5,947,187.761 631,639.648 5.81 371.09 2,984.20 35.13 103.93 2,908.15 2,816.51 -114.01 367.48 5,947,184.646 631,652.973 3.23 384.76 3,008.20 35.57 103.60 2,927.73 2,836.09 -117.31 380.97 5,947,181.578 631,666.514 2.00 398.62 3,031.90 36.05 103.09 2,946.95 2,855.31 -120.51 394.46 5,947,178.614 631,680.059 2.38 412.45 3,054.40 36.43 102.62 2,965.10 2,873.46 -123.47 407.43 5,947,175.881 631,693.075 2.09 425.71 3,077.55 36.67 102.40 2,983.69 2,892.05 -126.46 420.89 5,947,173.131 631,706.583 1.18 439.45 3,101.20 36.93 10228 3,002.63 2,910.99 -129.48 434.73 5,947,170.345 631,720.473 1.14 453.56 3,124.90 3230 102.16 3,021.53 2,929.89 -132.51 - 448.70 5,947,167.562 631,734.499 1.59 467.81 3,148.70 37.60 102.13 3,04042 2,948.78 -135.56 462.85 5,947,164.765 631,748.697 1.26 482.22 3,172.45 37.80 102.12 3,059.22 2,967.58 -138.61 477.05 5,947,161.963 631,762.947 0.84 496.69 3,196.25 38.28 102.03 3,077.96 2,986.32 -141.68 491.39 5,947,159.146 631,777.338 2.03 511.29 3,220.00 39.03 101.94 3,096.51 3,004.87 -144.76 505.90 5,947,156.319 631,791.900 3.17 526.06 3,243.80 39.70 101.86 3,114.91 3,023.27 -147.87 520.67 5,947,153.465 631,806.722 2.82 541.09 3,267.70 40.15 101.80 3,133.24 3,041.60 -151.01 535.69 5,947,150.583 631,821.786 1.89 556.36 3,291.50 40.65 101.82 3,151.36 3,059.72 -154.17 550.79 5,947,147.690 631,836.936 2.10 571.71 3,315.30 41.45 101.90 3,169.31 3,077.67 -157.38 556.08 5,947,144.745 631,852.285 3.37 587.27 3,338.90 42.05 101.96 3,186.92 3,095.28 -160.83 581.46 5,947,141.765 631,867.713 2.55 602.92 3,361.20 42.33 101.95 3,203.44 3,111.80 -163.73 596.11 5,947,138.919 631,882.415 1.26 617.83 3,380.40 42.58 101.92 3,217.60 3,125.96 -166.41 608.79 5,947,136.460 631,895.139 1.31 630.73 3,397.40 43.07 101.82 3,230.07 3,138.43 -168.79 620.10 5,947,134.281 631,906.487 2.91 642.24 3,414.70 43.68 101.61 3,242.65 3,151.01 -171.20 631.73 5,947,132.072 631,918.160 3.62 654.06 3,432.10 44.02 101.44 3,255.20 3,163.56 -173.61 643.54 5,947,129.870 631,930.010 2.07 666.05 1/6/2019 12:45:34PM Page 9 COMPASS 5000.1 Build 81D 1#2 BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well P-04 Project: PBU TV0 Reference: KB @ 91.64usft (P -04A) Sib: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Weill P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCPI Survey MD Inc Azi (azimuth) TVD TVDSS N/S EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 3,449.40 44.18 101.29 3,267.62 3,175.98 -175.98 655.35 5,947,127.704 631,941.852 1.10 678.03 3,466.80 44.33 101.17 3,280.08 3,188.44 -178.35 667.26 5,947,125.548 631,953.801 0.99 690.10 3,484.10 44.38 101.08 3,292.45 3,200.81 -180.68 679.12 5,947,123.422 631,965.706 0.46 702.13 3,501.40 44.33 100.99 3,304.82 3,213.18 -183.00 690.99 5,947,121.314 631,977.614 0.46 714.15 3,518.80 44.27 100.90 3,317.27 3,225.63 -185.30 702.93 5,947,119.215 631,989.583 0.50 726.23 3,536.10 44.33 100.84 3,329.66 3,238.02 -187.58 714.79 5,947,117.144 632,001.486 0.42 738.23 3,553.80 44.47 100.84 3,342.30 3,250.66 -189.91 726.95 5,947,115.028 632,013.687 0.79 750.54 3,572.50 44.58 100.85 3,355.63 3,263.99 -192.38 739.83 5,947,112.786 632,026.605 0.59 763.57 3,591.15 44.77 100.85 3,368.90 3,277.26 -194.85 752.71 5,947,110.543 632,039.523 1.02 776.60 3,610.10 44.98 100.86 3,382.32 3,290.68 -197.36 765.84 5,947,108.254 632,052.695 1.11 789.88 3,629.75 45.18 100.91 3,396.20 3,304.56 -199.99 779.51 5,947,105.866 632,066.402 1.03 803.71 3,649.55 45.42 101.00 3,410.13 3,318.49 -202.67 793.32 5,947,103.433 632,080.262 1.25 817.70 3,669.30 45.70 101.09 3,423.96 3,332.32 -205.37 807.16 5,947,100.973 632,094.146 1.45 831.72 3,689.15 45.98 101.19 3,437.78 3,346.14 -208.12 821.14 5,947,098.466 632,108.163 1.46 845.87 3,709.00 46.20 101.25 3,451.55 3,359.91 -210.90 835.16 5,947,095.928 632,122.235 1.13 860.09 3,728.75 46.35 101.30 3,465.20 3,373.56 -213.69 849.16 5,947,093.383 632,136.278 0.78 874.29 3,748.50 46.43 101.39 3,478.82 3,387.18 -216.51 863.18 5,947,090.815 632,150.344 0.52 888.51 3,768.60 46.52 101.50 3,492.67 3,401.03 -219.40 877.46 5,947,088.173 632,164.676 0.60 903.01 3,789.60 46.63 101.59 3,507.10 3,41546 -222.45 692,41 5,947,085.381 632,179.669 0.61 918.18 3,810.75 46.80 101.69 3,521.60 3,429.96 -225.56 907.49 5,947,082.539 632,194.799 0.87 933.50 3,831.85 46.97 101.89 3,536.02 3,444.38 -228.70 922.56 5,947,079.655 632,209.928 1.06 948.83 3,853.05 47.08 102.35 3,550.48 3,458.84 -231.96 937.73 5,947,076.663 632,225.146 1.67 964.28 3,874.25 47.20 103.05 3,564.90 3,473.26 -235.38 952.89 5,947,073.512 632,240.362 2.49 979.77 3,895.50 47.27 103.57 3,579.33 3,487.69 -238.97 968.07 5,947,070.186 632,255.602 1.83 995.33 3,916.75 47.35 103.85 3,593.73 3,502.09 -242.67 983.25 5,947,066.750 632,270.838 1.04 1,010.92 3,938.00 47.37 104.03 3,608.13 3,516.49 -246.44 998.42 5,947,063.249 632,266.072 0.63 1,026.53 3,959.30 47.30 104.19 3,622.56 3,530.92 -250.25 1,013.61 5,947,059.697 632,301.325 0.64 1,042.17 182019 12.4534PM Page 10 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Well P-04 Project: PBU TVD Reference KB @ 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/VV Northing Essting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 3,980.55 47.25 104.34 3636.98 3,545.34 -254.10 1,028.74 5,947,056.115 632,316.517 0.57 1,057.75 4,001.80 47.25 104.36 3,651.41 3,559.77 -257.97 1,043.85 5,947,052.512 632,331.699 0.07 1,073.34 4,022.85 47.30 104.37 3,665.69 3,574.05 -261.81 1,058.83 5,947,048.937 632,346.743 0.24 1,088.78 4,043.70 47.38 104.36 3,679.82 3,588.18 -265.61 1,073.69 5,947,045.393 632,361.659 0.39 1,104.09 4,064.25 47.45 104.33 3,693.72 3,602.08 -269.36 1,088.35 5,947,041.901 632,376.379 0.36 1,119.20 4,084.95 47.45 104.28 3,707.72 3,616.08 -273.13 1,103.12 5,947,038.391 632,391.218 0.18 1,13443 4,105.95 47.33 104.18 3,721.94 3,630.30 -276.92 1,118.10 5,947,034.854 632,406.262 0.67 1,149.87 4,126.85 47.27 104.11 3,736.11 3,644.47 -280.68 1,133.00 5,947,031.361 632,421.218 0.38 1,165.20 4,147.75 47.02 104.09 3,750.33 3,658.69 -284.41 1,147.86 5,947,027.889 632,436.140 1.20 1,180.50 4,168.70 48.70 104.06 3,764.65 3,673.01 -288.13 1,162.69 5,947,024.431 632,451.029 1.53 1,195.76 4,189.70 46.68 104.02 3,779.06 3,687.42 -291.84 1,177.51 5,947,020.983 632,465.914 0.17 1,211.02 4,210.70 48.80 104.02 3,793.45 3,701.81 -295.54 1,192.35 5,947,017.537 632,480.613 0.57 1,226.29 4,231.70 48.85 104.06 3,807.82 3,716.18 -299.26 1,207.20 5,947,014.082 632,495.732 0.28 1,241.58 4,252.75 46.95 104.10 3,822.20 3,730.56 -303.00 1,222.11 5,947,010.604 632,510.702 0.49 1,256.92 4,273.80 47.13 104.13 3,836.54 3,744.90 -308.75 1,237.05 5,947,007.108 632,525.704 0.86 1,272.30 4,294.80 47.08 104.16 3,850.84 3,759.20 -310.51 1,251.97 5,947,003.610 632,540.684 0.26 1,287.66 4,315.80 46.92 104.18 3,865.16 3,773.52 -314.27 1,266.86 5,947,000.110 632,555.637 0.77 1,303.00 4,336.90 46.80 104.21 3,879.59 3,787.95 -318.05 1,281.79 5,946,998.596 632,570.626 0.58 1,318.37 4,357.90 46.83 104.25 3,893.96 3,802.32 -321.81 1,296.63 5,946,993.092 632,585.530 0.20 1,333.66 4,379.00 47.08 104.27 3,908.36 3,816.72 -325.61 1,311.58 5,946,989.555 632,600.538 1.19 1,349.06 4,402.80 47.22 104.27 3,924.55 3,832.91 -329.91 1,328.49 5,946,985.550 632,617.519 0.59 1,366.49 4,426.60 47.18 104.32 3,940.72 3,849.08 -334.22 1,345.41 5,946,981.534 632,634.513 0.23 1,383.92 4,450.40 47.20 104.38 3,956.89 3,865.25 -338.55 1,362.32 5,946,977.502 632,651.499 0.20 1,401.36 4,474.05 47.27 104.42 3,972.95 3,881.31 -342.87 1,379.14 5,946,973.479 632,668.388 0.32 1,418.70 4,497.75 47.32 10445 3,989.02 3,897.38 -347.21 1,396.01 5,946,969.432 632,685.326 0.23 1,436.10 4,521.90 47.35 104.45 4,005.39 3,913.75 -351.64 1,413.20 5,946,965.302 632,702.596 0.12 1,453.83 4,546.40 47.47 104.48 4,021.97 3,930.33 -356.15 1,430.67 5,946,961.102 632,720.136 0.50 1,471.85 1/82019 12:45:34PM Page 11 COMPASS 5000.1 Build 810 BP bp Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well P-04 Project: PBU TVD Reference: KB @ 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 4,571.30 47.62 104.50 4,038.78 3,947.14 -360.74 1,448.46 5,946,956.816 632,737.999 0.61 1,490.20 4,598.70 47.63 104.53 4,057.25 3,965.61 -365.82 1,468.05 5,946,952.086 632,757.678 0.09 1,510.41 4,626.40 47.72 104.61 4,075.90 3,984.26 -370.97 1,487.87 5,946,947.281 632,777.584 0.39 1,530.87 4,661.30 47.93 104.71 4,099.33 4,007.69 -37251 1,512.89 5,946,941.173 632,802.715 0.64 1,556.71 4,696.35 48.30 104.86 4,122.73 4,031.09 -384.17 1,538.12 5,946,934.955 632,828.055 1.10 1,58278 4,730.35 48.70 105.09 4,145.26 4,053.62 -390.75 1,562.72 5,946,928.806 632,852.764 1.28 1,608.22 4,764.70 49.08 105.29 4,167.84 4,076.20 -397.53 1,587.70 5,946,922.461 632,877.853 1.19 1,634.08 4,799.15 49.45 105.39 4,190.33 4,098.69 -404.44 1,612.87 5,946,915.996 632,903.141 1.10 1,660.17 4,833.85 49.63 105.44 4,212.84 4,121.20 -011.46 1,638.33 5,946,909.423 632,928.710 0.53 1,686.56 4,868.55 49.62 105.48 4,235.32 4,143.68 418.50 1,663.81 5,946,902.823 632,954.306 0.09 1,712.98 4,903.25 49.72 105.51 4,257.78 4,166.14 425.57 1,689.30 5,946,896.202 632,979.914 0.30 1,739.42 4,938.00 49.98 105.53 4,280.18 4,188.54 432.68 1,714.89 5,946,889.542 633,005.625 0.75 1,765.97 4,972.85 50.17 105.50 4,302.55 4,210.91 -439.83 1,740.64 5,946,882.844 633,031.496 0.55 1,792.68 5,007.85 50.03 105.48 4,325.00 4,233.36 447.00 1,766.52 5,946,876.126 633,057.490 0.40 1,819.52 5,042.85 49.93 105.53 4,347.51 4,255.87 454.16 1,792.35 5,946,859.413 633,083.438 0.31 1,846.31 5,077.95 50.13 105.57 4,370.06 4,278.42 461.37 1,818.26 5,946,862.655 633,109.473 0.58 1,873.20 5,112.95 50.17 105.65 4,392.48 4,300.84 468.61 1,844.14 5,946,855.877 633,135.472 0.21 1,900.06 5,148.05 50.17 105.75 4,414.97 4,323.33 -475.90 1,870.09 5,946,849.037 633,161.542 0.22 1,927.00 5,183.25 50.20 105.80 4,437.50 4,345.86 -483.25 1,896.11 5,946,842.142 633,187.684 0.14 1,954.03 5,218.35 50.10 105.79 4,460.00 4,368.36 -490.58 1,922.04 5,946,835.261 633,213.735 0.29 1,980.97 5,253.50 50.05 105.79 4,482.55 4,390.91 -497.92 1,947.98 5,946,828.380 633,239.796 0.14 2,007.91 5,288.65 50.13 105.75 4,505.11 4,413.47 -505.25 1,973.92 5,946,821.507 633,265.865 0.24 2,034.86 5,323.75 49.93 105.55 4,527.65 4,436.01 -512.50 1,999.83 5,946,814.703 633,291.888 0.72 2,061.75 5,358.55 49.85 105.39 4,550.07 4,458.43 -519.60 2,025.48 5,946,808.053 633,317.657 0.42 2,088.35 5,392.70 50.02 105.41 4,572.05 4,480.41 -526.54 2,050.68 5,946,601.554 633,342.969 0.50 2,114.48 5,427.05 50.00 105.49 4,594.13 4,502.49 -533.55 2,076.04 5,946,794.987 633,368.452 0.19 2,140.78 5,461.45 50.00 105.53 4,616.24 4,524.60 -540.60 2,101.43 5,946,788.384 633,393.961 0.09 2,167.12 1/6/2019 12:45:34PM Page 12 COMPASS 5000.1 Build BID BP by Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well P-04 Project: PBU TVD Reference: KB @ 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCPI Survey MD Inc Azi (azimuth) TVD TVDSS N/S ENV Northing Easting DLeg V. Sec (usft) V) (I Waft) (usft) (usft) (usft) (usft) (usft) ('1100usft) tys8) 5,495.95 49.98 105.50 4,638.42 4,548.78 -547.67 2,126.90 5,946,781.761 633,419.540 0.09 2,193.53 5,53045 49.92 105.48 4,660.82 4,568.98 -554.72 2,152.35 5,946,775.154 633,445.107 0.18 2,219.93 5,564.95 49.93 105.49 4,682.83 4,591.19 -561.77 2,177.79 5,946,768.551 633,470.665 0.04 2,246.31 5,599.25 49.93 105.51 4,704.91 4,613.27 -568.79 2,203.08 5,946,761.979 633,496.076 0.04 2,272.55 5,633.55 49.83 105.56 4,727.02 4,635.38 -575.81 2,228.35 5,946,755.396 633,521.463 0.31 2,298.76 5,667.75 49.83 105.64 4,749.08 4,657.44 -582.84 2,253.52 5,946,748.809 633,546.750 0.18 2,324.89 5,702.05 50.02 105.72 4,771.16 4,679.52 -589.93 2,278.79 5,946,742.158 633,572.138 0.58 2,351.12 5,736.40 50.20 105.79 4,793.19 4,701.55 -597.09 2,304.16 5,946,735.445 633,597.623 0.55 2,377.47 5,770.75 50.32 105.82 4,815.15 4,723.51 -604.28 2,329.57 5,946,728.696 633,623.157 0.36 2,403.87 5,805.05 50.35 105.82 4,837.04 4,745.40 -611.48 2,354.98 5,946,721.942 633,648.680 0.09 2,430.27 5,839.35 50.27 105.80 4,858.95 4,767.31 -618.67 2,380.37 5,946,715.196 633,674.196 0.24 2,456.65 5,873.75 50.23 105.78 4,880.94 4,789.30 -625.87 2,405.82 5,946,708.444 633,699.765 0.12 2,483.09 5,908.05 50.27 105.75 4,902.88 4,811.24 -633.03 2,431.20 5,946,701724 633,725.264 0.13 2,509.45 5,942.35 50.23 105.72 4,924.81 4,833.17 -640.18 2,456.56 5,946,695.016 633,750.765 0.13 2,535.81 5,976.65 50.25 105.73 4,946.75 4,855.11 -647.33 2,481.97 5,946 688 314 633,776.265 0.06 2,562.17 6,010.85 50.32 105.77 4,968.60 4,876.96 -654.47 2,507.29 5,946,681.617 633,801.703 0.22 2,588.47 6,044.25 50.28 105.76 4,989.93 4,898.29 -661.45 2,532.02 5,946,675.067 633,826.551 0.12 2,614.16 6,078.05 50.18 105.72 5,011.56 4,919.92 -666.50 2,557.02 5,946,668.458 633,851.673 0.31 2,640.13 6,111.65 50.10 105.67 5,033.09 4,941.45 -675.48 2,581.85 5,946,661.915 633,876.619 0.26 2,665.91 6,145.40 50.02 105.58 5,054.76 4,963.12 -682.45 2,606.77 5,946,655.361 633,901.555 0.31 2,691.78 6,179.05 49.85 105.48 5,076.42 4,984.78 -689.34 2,631.58 5,946,648.921 633,926.582 0.55 2,717.52 6,212.85 49.75 105.46 5,098.23 5,006.59 -696.23 2,656.47 5,946,642.470 633,951.577 0.30 2,743.32 6,246.65 49.75 105.42 5,120.07 5,028.43 -703.10 2,681.33 5,946,636.037 633,976.558 0.09 2,769.10 6,279.85 49.65 105.37 5,141.54 5,049.90 -709.82 2,705.74 5,946,629.742 634,001.081 0.32 2,794.41 6,311.90 49.55 105.37 5,162.32 5,070.68 -716.29 2,729.28 5,946,623.685 634,024.723 0.31 2,818.80 6,343.90 49.57 105.36 5,183.07 5,091.43 -722.74 2,752.76 5,946,617.643 634,048.314 0.07 2,843.14 6,375.90 49.53 105.33 5,203.84 5,112.20 -729.19 2,776.25 5,946,611.610 634,071.904 0.14 2,867.48 IM019 12'45:34PM Page 13 COMPASS 5000.1 Build 81D BP by Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well P-04 Project: PBU ND Reference: KB Q 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc AN (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usR) (°) (°) (usft) (usR) (usft) (thrift) (Ural[) (uaft) (°MOOusR) (ueft) 6,407.85 49.45 105.28 5,224.59 5,132.95 -735.60 2,799.68 5,946,605.608 634,095440 0.28 2,891.76 6,439.85 49.50 105.20 5,245.38 5,153.74 -741.99 2,823.14 5,946,599.625 634,119.015 0.25 2,916.07 6,471.70 49.58 105.14 5,266.05 5,174.41 -748.33 2,846.53 5,946,593.692 634,142.509 0.29 2,940.28 6,503.55 49.55 105.07 5,286.71 5,195.07 -754.65 2,869.94 5,946,587.785 634,168.018 0.19 2,964.51 6,535.30 49.45 105.04 5,307,33 5,215.69 -760.92 2,893.25 5,946,581.922 634,189.436 0.32 2,988.63 6,567.25 49.40 105.06 5,328.11 5,236.47 -767.22 2,916.69 5,946,576.030 634,212.976 0.16 3,012.88 6,599.25 49.33 105.08 5,348.95 5,257.31 -773.54 2,940.14 5,946,570.127 634,236.530 0.22 3,037.14 6,631.30 49.47 105.10 5,369.81 5,278.17 -779.87 2,963.63 5,946,554.203 634,260.130 0.44 3,061.46 6,662.85 49.77 105.10 5,390.25 5,298.61 -786.13 2,986.84 5,946,558.348 634,283.438 0.95 3,085.48 6,694.20 49.88 105.05 5,410.47 5,318.83 -792.36 3,009.96 5,946,552.523 634,306.671 0.37 3,109.41 6,725.70 49.93 105.00 5,430.76 5,339.12 -798.61 3,033.24 5,946,546.683 634,330.047 0.20 3,133.49 6,757.15 49.90 105.01 5,451.01 5,359.37 -604.84 3,056.48 5,946,540.860 634,353.392 0.10 3,157.53 6,788.65 49.70 105.03 5,471.34 5,379.70 -811.07 3,079.72 5,946,535.031 634,376.733 0.64 3,181.57 6,820.05 49.77 105.06 5,491.64 5,400.00 -817.29 3,102.86 5,946,529.217 634,399.975 0.23 3,205.52 6,851.50 49.78 105.08 5,511.95 5,420.31 -823.54 3,126.04 5,946,523.379 634,423.265 0.06 3,229.51 6,882.95 49.57 105.10 5,532.30 5,440.66 -829.78 3,149.19 5,946,517.542 634,446.519 0.67 3,25347 6,914.30 49.48 105.12 5,552.65 5,461.01 -836.00 3,172.22 5,946,511.729 634,469.645 0.29 3,277.30 6,945.70 49.30 105.12 5,573.09 5,481.45 -842.21 3,195.23 5,946,505.914 634,492.760 0.57 3,301.12 6,977.10 49.13 105.10 5,593.60 5,501.96 -848.41 3,218.18 5,946,500.118 634,515.816 0.54 3,324.88 7,008.45 49.22 105.10 5,614.09 5,522.45 -854.59 3,241.09 5,946,494.339 634,538.822 0.29 3,348.58 7,039.85 49.22 105.06 5,634.60 5,542.% -860.78 3,264.04 5,946,488.554 634,561.883 0.10 3,372.34 7,071.25 49.05 105.01 5,655.15 5,563.51 -866.94 3,286.98 5,946,482.796 634,584.918 0.55 3,396.07 7,102.60 49.00 105.01 5,675.70 5,584.06 -873.07 3,309.84 5,946,477.066 634,607.881 0.16 3,419.72 7,134.00 49.02 105.01 5,696.30 5,604.66 -679.20 3,332.73 5,946,471.328 634,630.876 0.06 3,443.40 7,165.30 49.02 105.01 5,716.63 5,625.19 -885.32 3,355.55 5,946,465.607 634,653.801 0.00 3,467.01 7,196.70 49.07 105.05 5,737.41 5,645.77 -891.47 3,378.46 5,946,459.858 634,676.805 0.19 3,490.71 7,228.10 49.15 105.03 5,757.96 5,666.32 -897.63 3,401.38 5,946,454.100 634,699.832 0.26 3,514.43 1/8/2019 12:45:34PM Page 14 COMPASS 5000.1 Build BID am BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well P-04 Project: Pau TVD Reference', KB @ 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc AN (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 7,259.50 49.08 104.95 5,778.51 5,686.87 -903.77 3424.31 5,946,448.361 634,722.865 0.29 3,538.15 7,290.40 48.87 104.94 5,798.78 5,707.14 -909.79 3,446.85 5,946,442.739 634,745.505 0.36 3,561.46 7,321.00 48.97 104.98 5,818.86 5,727.22 -915.75 3,469.15 5,946,437.170 634,767.904 0.10 3,584.52 7,351.80 48.93 104.94 5,839.09 5,747.45 -921.75 3,491.59 5,946,431.567 634,790.444 0.16 3,607.73 7,382.60 48.85 104.87 5,859.34 5,767.70 -927.71 3,514.02 5,946,425.990 634,812.968 0.31 3,630.91 7,413.40 48.85 104.83 5,879.61 5,787.97 -933.66 3,536.44 5,946,420.439 634,835.484 0.10 3,654.08 7,444.15 48.80 104.75 5,899.85 5,808.21 -939.57 3,558.82 5,946,414.922 634,857.961 0.25 3,677.21 7,474.90 48.62 104.67 5,920.15 5,828.51 -945.43 3,581.16 5,946,409.446 634,880.405 0.82 3,700.29 7,505.65 48.43 104.59 5,940.51 5,848.87 -951.25 3,603.46 5,946,404.016 634,902.794 0.65 3,723.30 7,536.45 48.33 104.49 5,960.97 5,869.33 -957.03 3,625.74 5,946,398.826 634,925.177 0.41 3,746.30 7,567.25 48.22 104.43 5,981.47 5,889.83 -962.77 3,648.00 5,946,393.275 634,947.531 0.39 3,76926 7,598.05 48.07 104.44 6,002.02 5,910.38 -968.49 3,670.22 5,946,387.945 634,969.843 0.49 3,792.17 7,628.90 47.93 104.45 6,022.66 5,931.02 -974.21 3,692.42 5,946,382.615 634,992.138 0.45 3,815.07 7,659.75 47.85 104.41 6,043.35 5,951.71 -979.91 3,714.58 5,946,377.299 635,014.397 0.28 3,837.93 7,690.55 47.75 104.42 6,064.04 5,972.40 -985,59 3,736.68 5,946,372.006 635,036.589 0.33 3,860.71 7,721.45 47.58 104.48 6,084.85 5,993.21 -991.29 3,758.80 5,946,366.693 635,058.803 0.57 3,883.53 7,752.30 47.45 104.54 6,105.68 6,014.04 -996.99 3,780.83 5,946,361.378 635,080.922 0.45 3,906.25 7,783.25 47.33 104.62 6,126.64 6,035.00 -1,002.73 3,802.87 5,946,356.030 635,103.062 0.43 3,929.00 7,814.10 47.10 104.69 6,147.59 6,055.95 -1,008.46 3,824.78 5,946,350.685 635,125.061 0.76 3,95162 7,845.05 46.80 104.73 6,168.72 6,077.08 -1,014.20 3,846.65 5,946,345.325 635,147.032 0.97 3,974.22 7,875.95 46.58 104.74 6,189.91 6,098.27 -1,019.92 3,868.40 5,946,339.986 635,168.871 0.71 3,996.68 7,906.60 46.47 104.78 6,211.00 6,119.36 -1,025.59 3,889.91 5,946,334.696 635,190.473 0.37 4,018.90 7,936.85 46.33 104.76 6,231.86 6,140.22 -1,031.17 3,911.09 5,946,329.482 635,211.748 0.47 4,04078 7,967.15 46.15 104.75 6,252.82 6,161.18 -1,036.74 3,932.25 5,946,324,279 635,233.003 0.59 4,06264 7,997.45 45.98 104.80 6,273.84 6,182.20 -1,042.31 3,953.35 5,946,319.083 635,254.193 0.57 4,084.44 8,027.75 45.78 104.84 6,294.94 6,203.30 -1,047.87 3,974.38 5,946,313.887 635,275.313 0.67 4,106.17 8,057.94 45.62 104.90 6,316.02 6,224.38 -1,053.42 3,995.26 5,946,308.708 635,296.288 0.55 4,127.76 1WO19 12:45:34PM Page 15 COMPASS 5000.1 Build 81D BP by Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well P-04 Project: PSU ND Reference: KB Q 91.64usft (P -04A) Site: P MD Reference: KB Q? 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCPI Survey MD Inc Azi (azimuth) ND TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (waft) (usft) (°I100uaft) (usft) 8,088.15 45.55 104.90 6,337.16 6,245.52 -1,056.97 4,016.11 5,946,303.524 635,317.233 0.23 4,149.32 8,118.25 45.40 104.93 6,358.27 6,266.63 -1,06449 4,036.85 5,946,298.364 635,338.062 0.50 4,170.76 8,148.25 45.30 105.01 6,379.35 6,287.71 -1,070.00 4,057.47 5,946,293.211 635,358.771 0.38 4,192.09 8,178.45 45.22 105.03 6,400.61 6,308.97 -1,075.56 4,078.19 5,946,288.015 635,379.581 0.27 4,213.52 8,208.65 45.10 105.07 6,421.91 6,330.27 -1,081.12 4,098.87 5,946,282.816 635,400.353 0.41 4,234.92 8,238.75 44.88 105.16 6,443.19 8,351.55 -1,086.67 4,119.41 5,946,277.627 635,420.989 0.76 4,256.18 8,269.05 44.65 105.26 6,464.71 6,373.07 -1,092.27 4,140.00 5,946,272.389 635,441.672 0.79 4,277.51 8,299.35 44.58 105.37 6,486.28 6,394.64 -1,097.89 4,160.52 5,946,267.127 635,462.290 0.34 4,298.77 8,329.54 44.58 105.52 6,507.78 6,416.14 -1,103.53 4,180.95 5,946,261.842 635,482.809 0.35 4,319.95 8,359.79 44.55 105.60 6,529.33 6,437.89 -1,109.23 4,201.40 5,946,256.505 635,503.353 0.21 4,341.17 8,390.04 44.48 105.60 6,550.90 6,459.26 -1,114.93 4,221.83 5,946,251.159 635,523.874 0.23 4,362.37 8,420.29 44.43 105.67 6,572.49 6,480.85 -1,120.84 4,242.23 5,946,245.807 635,544.371 0.23 4,383.55 8,450.60 44.45 105.75 6,594.14 6,502.50 -1,128.39 4,262.66 5,946,240.418 635,564.895 0.20 4,404.76 8,480.90 44.43 105.78 6,615.77 6,524,13 -1,132.15 4,283.07 5,948,235.012 635,585.408 0.10 4,425.97 8,511.10 44.35 105.84 6,637.35 6,545.71 -1,137.91 4,30340 5,946,229.612 635,605.830 0.30 4,447.09 8,540.70 44.33 106.00 6,658.52 6,566.88 -1,143.58 4,323.30 5,946,224.285 635,625.819 0.38 4,467.77 8,570.40 44.30 106.11 6,679.77 6,588.13 -1,149.32 4,343.23 5,946,218.896 635,645.854 0.28 4,488.51 8,600.20 44.10 106.20 6,701.13 6,609.49 -1,155.10 4,363.19 5,946,213.465 635,665.905 0.70 4,50928 8,629.80 43.77 106.37 6,722.45 6,630.81 -1,160.86 4,382.90 5,946,208.051 635,685,715 1.18 4,529.82 8,659.54 43.50 106.58 6,743.97 6,652.33 -1,166.68 4,402.58 5,946,202.575 635,705.491 1.03 4,550.34 8,689.25 43.42 106.60 6,765.54 6,673.90 -1,172.55 4,422.16 5,946,197.049 635,725.164 0.58 4,57077 8,718.95 43.47 106.93 6,787.10 6,695.46 -1,178.47 4,441.70 5,946,191.466 635,744.808 0.34 4,591.19 8,748.60 43.42 107.07 6,808.63 6,716.99 -1,184.43 4,461.20 5,946,185.846 635,764.406 0.37 4,611.58 8,778.35 43.25 107.25 6,830.27 6,738.63 -1,190.46 4,480.71 5,946,180.164 635,784.014 0.71 4,632.00 8,808,05 43.05 107.47 6,851.94 6,760.30 -1,196.52 4,500.10 5,946,174.443 635,803.502 0.84 4,652.31 8,837.75 42.83 107.74 6,873.68 6,782.04 -1,202.64 4,519.38 5,946,168.861 635,822.889 0.97 4,672.54 8,867.40 42.53 108.06 6,895.48 6,803.84 -1,208.81 4,538.51 5,946,162.819 635,842.119 1.25 4,692.64 1/8/201912:45:34PM Page 16 COMPASS 5000.1 Build 81D BP bp Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well P-04 Project: PBU TVD Reference: KB @ 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) C) (') (usft) (usft) (us@) (usf) (usft) (usft) (•1100ustt) (usft) 8,897.15 42.30 108.36 6,917.44 6,825.80 -1,215.08 4,557.57 5,946,156.882 635,861.285 1.03 4,712.71 8,928.95 42.12 108.67 6,939.51 6,847.87 -1,221.44 4,576.55 5,946,150.857 635,880.376 0.92 4,732.72 8,956.75 41.88 109.07 6,961.66 6,870.02 -1,227.89 4,595.42 5,946,144.738 635,899.353 1.21 4,752.66 8,986.54 41.60 109.44 6,983.89 6,892.25 -1,234.43 4,614.15 5,946,138.526 635,918.186 1.25 4,772.48 9,016.35 41.37 109.71 7,006.22 6,914.58 -1,241.05 4,632.75 5,946,132.236 635,938.902 0.98 4,792.21 9,046.14 41.22 109.90 7,028.60 6,936.96 -1,247.71 4,651.25 5,946,125.899 635,955.511 0.66 4,811.85 9,075.95 41.15 110.04 7,051.04 6,959.40 -1,254.41 4,669.70 5,946,119.518 635,974.073 0.39 4,831.46 9,105.75 41.03 110.12 7,073.49 6,981.85 -1,261.14 4,688.09 5,946,113.116 635,992.581 0.44 4,851.02 9,135.14 40.87 110.22 7,095.69 7,004.05 -1,267.78 4,706.17 5,946,106.791 636,010.773 0.59 4,870.26 9,164.35 40.90 110.29 7,117.78 7,026.14 -1,274.40 4,724.11 5,946,100.487 636,028.822 0.19 4,889.35 9,193.54 41.00 110.29 7,139.82 7,048.18 -1,281.03 4,742.05 5,946,094.167 636,046.877 0.34 4,908.46 9,222.79 40.87 110.36 7,161.92 7,070.28 -1,287.69 4,760.03 5,946,087.825 636,064.960 0.47 4,927.80 9,252.00 40.55 110.44 7,184.08 7,092.42 -1,294.33 4,777.88 5,946,081497 636,082.929 1.11 4,946.62 9,281.20 40.22 110.55 7,206.30 7,11486 -1,300.95 4,795.60 5,946,075.184 636,100.762 1.16 4,965.51 9,310.39 40.03 110.69 7,228.62 7,136.98 -1,307.58 4,813.21 5,946,068.867 636,118.480 0.72 4,984.29 9,339.70 39.98 110.91 7,251.07 7,159.43 -1,314.27 4,830.82 5,946,062.485 636,136.207 0.51 5,003.10 9,368.89 39.95 111.21 7,273.45 7,181.81 -1,321.01 4,848.32 5,946,056.054 636,153.817 0.67 5,021.81 9,398.10 39.95 111.40 7,295.84 7,204.20 -1,327.82 4,865.80 5,946,049.546 636,171.406 0.42 5,040.52 9,427.29 39.82 111.51 7,318.24 7,226.80 -1,334.67 4,883.22 5,946,043.004 636,188.942 0.51 5,059.18 9,456.49 39.55 111.75 7,340.71 7,249.07 -1,341.54 4,900.55 5,946,036.435 636,206.391 1.06 5,077.78 9,485.70 39.30 112.01 7,363.27 7,271.63 -1,348.45 4,917.76 5,946,029.824 636,223.722 1.03 5,096.27 9,515.00 39.10 112.33 7,385.98 7,294.34 -1,355.44 4,934.91 5,946,023.137 636,240.989 0.97 5,114.72 9,544.20 39.00 112.75 7,408.66 7,317.02 -1,362.49 4,951.90 5,946,016.383 636,258.099 0.97 5,133.04 9,573.39 39.00 113.22 7,431.34 7,339.70 -1,369.67 4,968.82 5,946,009.506 636,275.131 1.01 5,151.32 9,602.45 39.00 113.75 7,453.92 7,362.28 -1,376.95 4,985.59 5,946,002.513 636,292.027 1.15 5,169.50 9,631.50 39.03 114.31 7,476.50 7,384.86 -1,384.40 5,002.29 5,945,995.359 636,308.856 1.22 5,187.66 9,660.54 39.23 114.87 7,499.02 7,407.38 -1,392.03 5,018.96 5,945,988.025 636,325.649 1.40 5,205.84 1/8@019 12:45 34P Page 17 COMPASS 5000 1 Build 81D BP Final Survey Report Company: North America - ALASKA -aP Local Coordinate Reference: Well P-04 Project: PBU TVD Reference: KB @ 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD NDSS N/S E/W Northing EaMing DLeg V. Sec (usft) V) C) (usft) (usft) (usft) (usft) (usft) (usft) (Wousft) (usft) 9,689.64 39.45 115.45 7,521.53 7429.89 -1,399.87 5,035.65 5,945,980.475 636,342479 1.47 5,224.11 9,718.45 39.80 116.02 7,543.75 7,452.11 -1,407.83 5,052.17 5,945,972.803 636,359.130 1.36 5,242.25 9,747.04 39.78 116.43 7,565.75 7,474.11 -1,415.90 5,068.55 5,945,965.022 636,375.646 1.11 5,260.29 9,775.60 39.93 116.69 7,587.68 7,496.04 -1,424.08 5,084.92 5,945,957.126 636,392.156 0.78 5,278.35 9,804.15 39.98 117.07 7,609.56 7,517.92 -1,432.37 5,101.27 5,945,949.124 636,408.650 0.87 5,29643 9,83275 40.05 117.57 7,631.46 7,539.82 -1,440.81 5,117.61 5,945,940.970 636,425.131 1.15 5,314.54 9,861.35 40.10 117.99 7,653.35 7,561.71 -1,449.39 5,133.90 5,945,932.675 636,441.567 0.96 5,332.65 9,889.85 40.10 118.37 7,675.15 7,583.51 -1,458.06 5,150.08 5,945,924.290 636,457.896 0.86 5,35067 9,918.54 40.08 118.77 7,697.10 7,605.46 -1,466.90 5,166.31 5,945,915.739 636,474.273 0.90 5,368.79 9,947.15 40.10 119.13 7,718.99 7,627.35 -1,475.82 5,182.43 5,945,907.104 636,490.547 0.81 5,386.84 9,975.85 40.23 119.51 7,740.92 7,649.28 -1,484.88 5,198.57 5,945,898.323 636,506.841 0.97 5,404.95 10,004.54 40.35 119.87 7,762.80 7,671.16 -1,494.07 5,214.69 5,945,889.416 636,523.114 0.91 5,423.07 10,033.25 40.53 120.18 7,784.65 7693.01 -1,503.39 5,230.81 5,945,880.381 636,539.397 0.94 5,441.23 10,061.89 40.85 120.50 7,808.37 7,714.73 -1,512.82 5,246.92 5,945,871.232 636,555.672 1.33 5,459.42 10,090.54 41.00 120.84 7,828.02 7,736.38 -1,522.40 5,263.07 5,945,861.943 636,571.978 0.94 5,477.68 10,119.25 40.85 121.32 7,849.71 7,758.07 -1,532.10 5,279.17 5,945,852.517 636,588.251 1.21 5,495.95 10,148.00 40.68 121.80 7,871.45 7,779.81 -1,541.95 5,295.20 5,945,842.954 636,604.447 1.10 5,514.18 10,176.95 40.97 122.13 7,893.33 7,801.69 -1,551.99 5,311.29 5,945,833.197 636,620.707 0.81 5,532.53 10,206.25 40.83 122.45 7,915.47 7,823.83 -1,562.24 5,327.51 5,945,823.234 636,637.099 0.86 5,551.06 10,235.54 40.70 122.69 7,937.66 7,846.02 -1,572.53 5,343.63 5,945,813.222 636,653.392 0.70 5,569.51 10,264.85 40.57 122.81 7,959.90 7,868.26 -1,582.86 5,359.68 5,945,803.178 636,669.622 0.52 5,587.91 10,293.95 40.45 122.92 7,982.02 7,890.38 -1,593.12 5,375.56 5,945,793.199 636,685.674 0.48 5,606.12 10,322.65 40.32 123.06 8,003.88 7,912.24 -1,603.24 5,391.15 5,945,783.349 636,701.444 0.55 5,624.02 10,351.20 40.17 123.18 8,025.68 7,934.04 -1,613.32 5,406.60 5,945,773.542 636,717.065 0.59 5,641.77 10,379.64 40.13 123.17 8,047.41 7,955.77 -1,623.35 5,421.95 5,945,763.778 636,732.585 0.14 5,659.41 10,408.04 40.13 122.98 8,069.13 7,977.49 -1,633.34 5,437.29 5,945,754.058 636,748.094 0.43 5,677.02 10,436.70 40.03 122.72 8,091.06 7,999.42 -1,643.35 5,452.79 5,945,744,321 636,763.767 0.68 5,694.80 1WO19 12:45:34PM Page 18 COMPASS 5000.1 Build 81D BP Final Survey Report Company: North America - ALASKA - BP Local Co-ommate Reference: Well P-04 Project: Pau TVD Reference: KB @ 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easang DLeg V. Sac (usft) V) (°) (usft) (usft) (usit) (usft) (usft) Wait) ('1101 ft) Wal 10,465.35 39.90 122.55 8,113.02 8,021.38 -1,653.28 5,468.29 5,945,734.669 636,779.434 0.59 5,712.55 10,493,95 39.82 122.45 8,134.97 8,043.33 -1,663.13 5,483.75 5,945,725.092 636,795.061 0.36 5,730.24 10,522.54 39.73 122.40 8,156.94 8,065.30 -1,672.93 5,499.19 5,945,715.556 636,810.668 0.33 5,747.89 10,551.20 39.67 122.52 8,178.99 8,087.35 -1,682.76 5,514.63 5,945,706.002 636,826.283 0.34 5,765.56 10,579.89 39.70 122.80 8,201.07 8,109.43 -1,692.65 5,530.06 5,945,698.387 636,841.875 0.63 5,783.23 10,606.59 39.47 122.96 6,223.19 8,131.55 -1,702.58 5,545.42 5,945,686.729 636,857.403 0.88 5,800.851 10,637.29 39.23 123.15 8,245.38 8,153.74 -1,712.50 5,560.67 5,945,677.071 636,872.825 0.94 5,818.36 10,685.99 39.08 123.61 8,267.64 8,176.00 -1,722.47 5,575.80 5,945,667.367 636,888.128 1.14 5,83577 10,694.79 38.78 124.18 8,290.04 8,198.40 -1,732.56 5,590.82 5,945,657.540 636,903.322 1.82 5,853.12 10,723.54 38.57 124.83 8,312.49 8,220.85 -1,74274 5,605.63 5,945,647.623 636,918.301 1.59 5,87028 10,752.29 38.33 125.52 8,335.00 8,243.36 -1,753.04 5,620.24 5,945,637.582 636,933.090 1.71 5,887.30 10,780.99 38.05 126.11 8,35256 8,265.92 -1,763.42 5,634.63 5,945,627.452 636,942657 1.60 5,904.12 10,809.70 37.90 126.65 - 8,380.19 8,288.55 -1,773.90 5,648.85 5,945,617.224 636,962.059 1.27 5,920.82 10,838.60 38.27 127.28 8,402.94 8,311.30 -1,784.62 5,663.10 5,945,606.755 636,976.486 1.86 5,937.60 10,867.09 38.72 128.14 8,425.24 8,333.60 -1,795.47 5,677.12 5,945,596.155 636,990.700 2.45 5,954.22 10,895.34 38.72 129.27 8,447.28 8,355.64 -1,806.52 5,690.91 5,945,585.349 837,004.879 2.50 5,970.68 10,923.54 38.82 130.37 8,469.27 8,377.63 -1,817.82 5,704.48 5,945,574.280 637,018.435 2.47 5,986.99 10,951.70 39.32 130.97 8,491.13 8,399.49 -1,829.39 5,717.94 5,945,562.951 637,032.095 2.23 6,003.28 10,979.89 39.83 131.30 8,512.86 8,421.22 -1,841.21 5,731.46 5,945,551.375 637,045.824 1.96 6,019.71 11,008.14 40.17 131.65 8,534.50 8,442.86 -1,853.23 5,745.07 5,945,539.588 637,059.636 1.44 6,036.28 11,036.35 40.53 131.92 8,556.00 8,464.36 -1,865.40 5,758.69 5,945,527.658 637,073.464 1.42 6,052.90 11,064.54 41.02 131.98 8,577.35 8,485.71 -1,877.71 5,772.38 5,945,515.592 637,087.368 1.74 6,069.63 11,092.74 41.45 131.57 8,598.55 8,506.91 -1,890.09 5,786.24 5,945,503.454 637,101.443 1.80 6,086.55 11,120.79 41.87 130.86 8,619.51 8,527.87 -1,902.38 5,800.27 5,945,491.417 637,115.679 2.25 6,103.60 11,149.04 42.43 130.18 8,640.45 8,548.81 -1,914.69 5,814.68 5,945,479.354 637,130.302 2.56 6,121.02 11,177.24 43.17 129.67 8,661.14 8,569.50 -1,928.99 5,829.37 5,945,467.317 637,145.207 2.90 6,138.71 11,205.54 43.90 129.47 8,681.66 8,590.02 -1,939.41 5,844.40 5,945,455.165 637,160.446 2.63 6,156.74 1/8/2019 12:45:34PM Page 19 COMPASS 5000.1 Build 81D In BP Final Survey Report Company: North Amenca- ALASKA - BP Local Coordinate Reference: Well P-04 Project: PBU TVD Reference: KB Q 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easgng DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usit) (usfq 11.233.85 44.35 129.41 8,701.98 8,610.34 -1,951.93 5,859.62 5,945,442.912 637,175.883 1.60 6,175.00 11,262.14 44.55 129.19 8722.18 8,630.54 -1,964.48 5,874.95 5,945,430.635 637,191.429 0.89 6,193.37 11,290.39 44.67 128.81 8,742.29 8,650.65 -1,978.96 5,890.37 5,945,418.421 637,207.061 1.04 6,211.81 11,318.74 44.75 128.22 8,762.44 8,670.80 -1,989.38 5,905.98 5,945,406.276 637,222.879 1.49 6,230.40 11,347.10 44.73 127.74 8,782.58 8,690.94 -2,001.67 5,921.71 5,945,394.269 637,238.825 1.19 6,249.08 11,375.49 44.62 127.48 8,802.77 8,711.13 -2,013.85 5,937.52 5,945,382.366 637,254.846 0.75 6,267.80 11,403.84 44.68 126.74 8,822.94 8,731.30 -2,025.87 5,953.41 5,945,370.625 637,270.940 1.85 6,286.54 11,431.94 44.78 125.74 8,842.90 8,751.26 -2,037.56 5,969.36 5,945,359.215 637,287.090 2.53 6,305.25 11,459.70 44.77 125.11 8,862.61 8,770.97 -2,048.89 5,985.29 5,945,348.163 637,303.216 1.60 6,323.83 11,487.49 44.98 124.71 8,882.30 8,790.66 -2,060.11 6,001.37 5,945,337.225 637,319.487 1.27 6,342.52 11,515.29 45.17 124.27 8,901,93 8,810.29 -2,071.26 6,017.60 5,945,326.364 637,335.901 1.31 6,361.32 11,517.00 45.16 124.24 8,903.14 8,811.50 -2,071.94 6,018.60 5945,325.700 637,336.915 1.37 6,362.48 11,540.26 49.18 124.28 8,918.95 8,827.31 -2,081.54 6,032.69 5945,316.346 637,351.175 17.28 6,378.80 11,570.09 59.18 124.32 8,936.38 8,844.74 -2,095.16 6,052.65 5,945,303.064 637,371.364 33.52 6,401.90 11,600.40 70.39 124.36 8,949.28 8,857.64 -2,110.60 6,075.26 5,945,288.037 637,394.234 36.98 6,428.07 11,630.28 83.14 127.18 8,956.10 8,864.46 -2,127.58 5,098.79 5,945,271.471 637,418.062 43.64 6,455.60 11,660.21 86.04 138.00 8,958.93 8,867.29 -2,147.72 6,120.69 5,945,251.720 637,440.305 37.27 6,482.49 11,689.92 83.91 149.23 8,961.54 8,869.90 -2,171.50 6,138.22 5,945,228.248 637,458.246 38.33 6,506.30 11,720.38 84.15 160.46 8,964.72 8,873.08 -2,198.88 6,151.08 5,945,201.102 637,471.576 36.68 6,526.72 11,749.74 83.97 172.67 8,967.77 8,876.13 -2,227.23 6,157.85 5,945,172.878 637,478.841 41.37 6,541.62 11,786.07 83.66 184.52 8,971.70 8,880.06 -2,263.27 6,158.73 5,945,136.860 637,480.354 32.44 6,553.19 11,813.55 85.08 192.00 8,974.40 8,882.76 -2,290.31 6,154.81 5,945,109.755 637,476.899 27.58 6,557.48 11,840.51 86.59 200.07 8,976.36 8,884.72 -2,316.13 6,147.38 5,945,083.812 637,469.928 30.37 6,558.07 11,871.25 84.37 209.82 8,978.79 8,887.15 -2,343.88 6,134.48 5,945,055.842 637,457.511 32.43 6,554.01 11,901.71 83.44 219.76 8,982.03 8,890.39 -2,368.72 6,117.22 5,945,030.703 637,440.691 32.59 6,544.92 11,931.28 83.85 231.11 8,985.31 8,893.67 -2,389.31 6,096.32 5,945,009.757 637,420.151 38.17 6,531.09 11,980.79 84.66 240.15 8,988.27 8,896.63 -2,405.87 6,072.11 5,944,992.782 637,396.235 30.60 6,512.90 1/8/2019 12:45:34PM Page 20 COMPASS 5000.1 Build BID BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well P-04 Project: PBU TVD Reference: KB @ 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS N/S E/W Northing Easting 1311-e9 V. Sac (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (1100usR (usft) 11.959.02 84.39 249.88 8,990.97 8,899.33 -2,417.72 6,04667 5,944,980486 637,371.008 34.32 6,492.14 12,020.56 83.73 259.34 8994.25 8,902.61 -2,426.04 6,016.46 5,944,971.644 637,340.949 29.91 6,465.77 12,050.32 82.16 268.02 8,997.91 8,90627 -2,429.29 5,987.13 5,944,967.881 637,311.688 29.42 6,438.74 12,082.50 80.98 278.66 9,002.64 8,911.00 -2,427.45 5,955.40 5,944,969.175 637,279.933 32.91 6,407.90 12,110.05 80.16 287.12 9,007.16 8,915.52 -2,421.39 5,928.94 5,944,974.767 637,253.366 30.44 6,380.82 12,142.12 79.58 293.72 9,012.81 8,921.17 -2,410.38 5,899.37 5,944,985.255 637,223.611 20.34 6,349.32 12,170.70 79.80 292.86 9,017.92 8,926.28 -2,399.27 5,873.54 5,944,995.920 637,197.596 3.06 6,321.35 12,200.46 81.47 290.43 9,022.77 8,931.13 -2,388.44 5,846.25 5,945,006.270 637,170.124 9.82 6,292.08 12,225.56 81.25 288.55 9,026.54 8,934.90 -2,380.16 5,822.86 5,945,014.139 637,146.593 7.46 6,267.28 12,260.48 82.35 285.99 9,031.52 8,939.88 -2,369.90 5,789.85 5,945,023.820 637,113.420 7.91 6,232.72 12,290.39 83.45 284.42 9,035.21 8,943.57 -2,362.12 5,761.21 5,945,031.103 637,084.650 6.38 6,203.06 12,320.49 85.05 282.26 9,038.23 8,946,59 -2,355.21 5,732.08 5,945,037.502 637,055.399 8.90 6,173.19 12,355.83 89.29 281.78 9039.97 8,948.33 -2,347.90 5;697.76 6,945,044.209 637,020.960 12.14 6,138.25 12,380.70 91.75 280.96 9,039:74 8,948.10 -2,342.96 5,673.18 5,945,048.721 636,996.304 10.34 6,113.32 12,415.57 94.98 280.67 9,037.69 8,946.05 -2,336.43 5,638.99 5,945,064.654 636,962.011 9.30 6,078.74 12,440.94 95.26 276.07 9,035.43 8,943.79 -2,332.75 5,614.00 5,945,057.895 636,936.960 18.09 6,053.78 12,472.21 96.34 275.55 9,032.27 8,940.63 -2,329.60 5,583.05 5,945,060.504 636,905.963 3.83 6,023.29 12,501.07 96.83 273.14 9,028.96 8,937.32 -2,327.43 5,554.47 5,945,062.177 636,872347 8.47 5,995.36 12,536.72 96.36 270.21 9,024.86 8,933.22 -2,326.39 5,519.07 5,945,062.594 636,841.942 8.27 5,961.26 12,561.78 94.86 268.60 9,022.41 8,930.77 -2,326.65 5,494.14 5,945,061.900 636,617.015 8.76 5,937.53 12,595.22 93.72 263.66 9,019.91 8,928.27 -2,328.91 5,460.88 5,945,059.070 636,783.803 15.12 5,90644 12,630.67 92.74 262.36 9,017.91 8,926.27 -2,333.21 5,425.75 5,945,054.151 636,748.757 4.59 5,874.18 12,650.70 91.88 258.90 9,017.10 8,925.46 -2,336.47 5,406.00 5,945,050.550 636,729.075 17.79 5,856.30 12,675.31 91.32 256.54 9,016.42 8,924.78 -2,341.70 5,381.97 5,945,044.900 636,705.136 9.85 5,834.91 12,702.42 91.11 255.19 9,015.84 8,924.20 -2,348.32 5,355.69 5,945,037.824 636,678.975 5.04 5,811.79 12,732.10 88.71 256.02 9,015.89 8,924.25 -2,355.70 5,326.94 5,945,029.947 636,650.364 8.56 5,786.54 12,760.76 88.96 262.68 9,016.47 8,924.83 -2,360.99 5,298.79 5,945,024.165 636,622.318 23.25 5,761.24 1/82019 12.45.34PM Page 21 COMPASS 5000.1 Build 81D 0• • BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well P-04 Project: PBU TVD Reference: KB Q 91.64usft (P -04A) Site: P MD Reference: KB @ 91.64usft (P -04A) Well: P-04 North Reference: True Wellbore: P -04A Survey Calculation Method: Minimum Curvature Design: P -04A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi(azimuth) TVD 7VDSS N/S E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 12,790.78 90.49 268.80 9,016.61 8,924.97 -2,363.22 5,268.87 5,945,021,415 636,592443 21.01 5,733.34 12,822.99 89.72 269.97 9,016.56 8,924.92 -2,363.57 5,236.67 5,945,020.508 636,560.249 4.35 5,702.69 12,842.56 89.02 270.55 9,016.77 8,925.13 -2,363.48 5,217.10 5,945,020.255 636,540.684 4.65 5,683.98 12,871.32 90.64 272.75 9,016.86 8,925.22 -2,362.85 5,188.35 5,945,020.582 636,511.931 9.50 5,656.29 12,905.08 91.87 269.15 9,016.12 8,924.48 -2,362.09 5,154.61 5,945,020.553 636,478.188 11.27 5,623.91 12,935.42 92.86 265.30 9,014.86 8,923.22 -2,363.56 5,124.34 5,945,018.559 636,447.948 13.09 5,595.44 12,965.17 92.15 267.82 9,013.56 8,921.92 -2,365.34 5,094.67 5,945,016.259 636,418.320 8.79 5,567.65 12,990.49 91.26 262.25 9,012.81 8,921.17 -2,367.53 5,069.47 5,945,013.630 636,393.161 22.27 5,544.24 13,022.65 93.87 258.84 9,011.37 8,919.73 -2,372.81 5,037.79 5,945,007.804 636,361.576 13.34 5,515.56 13,049.25 92.27 257.86 9,009.95 8,918.31 -2,378.17 5,011.77 5,945,001.988 636,335.662 7.05 5,492.32 13,085.65 90.52 255.84 9,009.06 8,917.42 -2,386.45 4,976.34 5,944,993.094 636,300.383 7.34 5,460.95 13,109.30 89.17 253.76 9,009.12 8,917.48 -2,392.65 4,953.52 5,944,986.497 636,277.676 10.48 5,441.01 13,140.89 90.65 250.94 9,009.17 8,917.53 -2,402.22 4,923.42 5,944,976.397 636,247.750 10.08 5,415.12 13,172.42 91.63 248.55 9,008.55 8,916.91 -2,413.14 4,893.85 5,944,964.972 636,218.376 8.19 5,390.14 13,201.35 91.44 245.54 9,007.77 8,916.13 -2,424.41 4,867.22 5,944,953.233 636,191.952 10.42 5,368.07 13,232.60 92.15 242.51 9,006.79 8,915.15 -2,438.09 4,839.15 5,944,939.068 636,164.121 9.95 5,345.33 13,261.80 90.15 239.75 9,006.21 8,914.57 -2,452.19 4,813.58 5,944,924.532 636,138.811 11.67 5,325.12 13,296.05 88.83 236.35 9,008.51 8,914.87 -2,470.31 4,784.53 5,944,905.909 636,110.078 10.65 5,302.77 13,322.73 87.79 238.76 9,007.30 8,915.66 -2,484.61 4,762.03 5,944,891.214 636,087.829 9.83 5,285.54 13,352.26 89.91 242.86 9,007.89 8,916.25 -2,499.01 4,736.26 5,944,876.373 636,062.318 15.63 5,265.22 13,385.11 91.81 248.50 9,007.40 8,915.76 -2,512.53 4,706.34 5,944,862.333 636,032.643 18.11 5,240.68 13,408.98 93.66 252.07 9,006.26 8,914.62 -2,520.57 4,683.90 5,944,853.902 636,010.348 16.83 5,221.65 13,440.67 91.32 256.95 9,004.88 8,913.24 -2,529.02 4,653.40 5,944,844.921 635,980.003 17.06 5,195.04 13,470.88 89.82 260.97 9,004.58 8,912.94 -2,534.81 4,623.76 5,944,838.622 635,950.469 14.20 5,168.46 13,504.00 87.48 263.45 9,005.36 8,913.72 -2,539.29 4,590.96 5,944,833.563 635,917.754 10.29 5,138.48 13,529.88 85.73 267.77 9,006.89 8,915.25 -2,541.27 4,565.21 5,944,831.137 635,892.043 17.98 5,114.48 13,561.86 81.78 269.67 9,010.37 8,918.73 -2,541.98 4,533.43 5,944,829.871 635,860.288 13.89 5,084.36 1/8/2019 12.45:34PM Page 22 COMPASS 5000.1 Build 610 A as Company: North America - ALASKA - BP Project: PBU Site. P Well: P-04 Wellbore: P -04A Design'. P -04A Survey MD Inc Azi (azimuth( TVD (usft) (°I (I (usft) 13.602 00 81.78 269.67 9,016.11 BP Final Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well P-04 KB @ 91.64usft (P -04A) KB Q 91.64usft (P -04A) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 TVDSS N/S E/W Northing EasUng DLeg V. Sec (usft) (usft) (usft) (usft) (usft) ("MOOusft) (usft) 8,924.47 -2,542.21 4,493.70 5,944,828.950 635,820.575 0.00 5,046.50 1/8/2019 12.45:34PM Page 23 COMPASS 5000.1 Build 81D EEO Prow: PBU xpeuwmnIniW�b:WM=7 WELLBORE DETAILS: P -(14A Rs�NFMMTM P •saaa.nee PMA Do.ae"m°IUElaelaeue'. wdlF4a,nwNut : PM 9ap�5)�Y'm VaFP(MI ReMew'. It0�91 Wim'AI Pi1bala: P4N CpNye'm Pa 9p4nryS Relaenw. 9M -(O UN,O WE) Plan: PMO rasa.e ami Trem MO'. 11515.29_ g°'uue Deem Relxerw mtmmuamnryaa uwlefion Wmo1. IAimunGurveve Easling (200 usMn) NB @ 91,5<us0 (P -W) ' b North America - ALASKA - BP PBU P P-04 P -04A P -04A WP02 AOGCC Offset Well Report 08 January, 2019 Company: North America - ALASKA - BP Project: PBU Reference Site: P Site Error: 0.00usft Reference Well: P-04 Well Error: 0.00usft Reference Wellbore P -04A Reference Design: P -04A WP02 BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well P-04 KB 91.64usft (P -04A) KB 91.64usft (P -04A) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference P -04A WP02 GCT -MS Filter type: NO GLOBAL FILTER: Using user defined selection 8 filtering criteria WARNING: There is hidden tight data in this project Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 1/8/2019 From To (usft) (usft) Survey(Wellbore) 50.30 11,51529 P-04 Srvy 1 GCT -MS (P-04) 11,517.00 13,602.00 Survey#1 (P -04A) Tool Name i i Description GCT -MS Schlumberger GCT multishot MWD MWD- Standard 1/812019 1:02, 43PM Page 2 014 COMPASS 5000.1 Build 81D BP bp Anticollisian Report Company: North America -ALASKA - BP Local Coordinate Reference: Well P-04 Project: PBU TVD Reference: KB @ 91.64usft (P -04A) Reference Site: P MD Reference: KB @ 91.64usft (P -04A) Site Error: 0 oousft North Reference: True Reference Well P-04 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore P -04A Database: EDM RSK- Alaska PROD -ANCP1 Reference Design: P -04A WP02 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) P P-01 - P-01 - P-01 855.89 850.00 104.33 P-01 - P -01A - P -01A 855.89 850.00 104.33 P-01 - P-01APB1 - P-O1APB1 855.89 850.00 104.33 P-01 - P-01APB2 - P-01APB2 855.89 850.00 104.33 P-01 - P-01APB3 - P-01APB3 855.89 850.00 104.33 P-02 - P-02 - P-02 753.56 750.00 60.44 P-02 - P -02A - P -02A 753.56 750.00 60.44 P-02 - P-02APB1 - P-02APB1 753.56 750.00 60.44 P -03 -P -03-P-03 1,900.03 1,900.00 27.44 P-03 - P -03A - P -03A 1,900.03 1,900.00 2744 P-03 - P-03AP81 - P-03APBI 1,900.03 1,900.00 27,44 P-03 - P-03APB2 - P-03APB2 1,900.03 1,900.00 27.44 P-04 - P -04A - P -04A WP02 13,647.58 13,647.58 0.00 P -05 -P -05-P-05 1,277.57 1,275.00 33.69 P-05 - P -05A - P -05A 1,277.57 1,275.00 33.69 P-05 - P-05PB1 - P-05PB1 1,277.57 1,275.00 33.69 P -06 -P -06-P-06 1,798.22 1,800.00 71.89 P-06 - P -06A - P -06A 1,798.22 1,800.00 71.89 P-06 - P -06B - P -06B 1,798.22 1,800.00 71.89 P-07 - P-07 - P-07 803.49 800.00 103.36 P-07 - P -07A - P -07A 80149 800.00 103.36 P -08 -P -08-P-08 1,244.72 1,250.00 93.96 P-08 - P -08A - P -08A 1,244.72 1,250.00 93.96 P-08 - P-08APB1 - P-08APB1 1,244.72 1,250.00 93.96 P-09 - P-09 - P-09 951.16 950.00 178.76 P-09 - P-091_1 - P-091_1 951.16 950.00 178.76 P -10 -P -10-P-10 1,943.17 1,950.00 216.11 P-10 - P-1 GA - P -10A 1,943.17 1,950.00 216.11 P-11 - P-11 - P-11 2,605.90 2,575.00 49.64 P-11 - P-111_1 - P-111_1 2,605.90 2,575.00 49.64 P-11 - P-11UPB1 - P-11L1PB1 2,605.90 2,575.00 49.64 P-11-P-11L1PB2-P-11UPB2 2,605.90 2,575.00 49.64 P-12 - P-12 - P-12 2,578.19 2,550.00 16.94 P-12 - P -12A- P -12A 2,583.22 2,550.00 16.74 P-12-P-12APBI-P-12APB1 2,583.22 2,550.00 16.74 P-12 - P-12APB2 - P-12APB2 2,583.22 2,550.00 16.74 P-12 - P -12B - P -12B 2,583.22 2,550.00 16.74 P-12 - P-12BL1 - P-12BL1 2,583.22 2,550.00 16.74 P-13 - P-13 - P-13 2,548.80 2,525.00 14.29 P-14 - P-14 - P-14 2,547.50 2,525.00 52.89 P-15 - P-15 - P-15 2,495.66 2,475.00 78.58 P-15 - P -1 5L1 - P-151-1 2,495.66 2,475.00 78.58 P-16 - P-16 - P-16 2,493.94 2,475.00 120.53 P-16 - P -16A - P -16A 2,492.10 2,475.00 120.51 P-16 - P-16APB1 - P-16APB1 2,492.10 2,475.00 120.51 P-17 - P-17 - P-17 2,469.79 2,475.00 152.79 P-17 - P-171.1 - P-171.1 2,489.79 2,475.00 152.79 P-18 - P-18 - P-18 2,466.04 2,450.00 177.91 P -18 -P -181.1-P-1 BLI 2,466.04 2,450.00 177.91 P-19 - P-19 - P-19 2,464.10 2,450.00 222.33 P-19 - P-191-1 - P-1911 2,464.10 2,450.00 222.33 P-19 - P-19LIPBI - P-191_1 PBI 2,464.10 2,450.00 222.33 P-20 - P-20 - P-20 2,458.36 2,450.00 246.89 1/!2019 1:02,43PM Page 3 of 4 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP Project: PBU Reference Site: P Site Error: 0.00usft Reference Well: P-04 Well Error: 0.00usft Reference Wellbore P -04A Reference Design: P -04A WP02 Summary Site Name Offset Well - Wellbore - Design P P-20 - P -20A - P -20A P-20 - P-20APB1 - P-20APB1 P-20 - P -20B - P -20B P-22 - P-22 - P-22 P-23 - P-23 - P-23 P-23 - Plan P -23A- Plan #2 P -23A P-24 - P-24 - P-24 P-24 - P-24PB1 - P-24PB1 P-25 - P-25 - P-25 P-25 - P-2511 - P-2511 P-26 - P-26 - P-26 P-27 - P-27 - P-27 --28 - P-28 - P-28 1-30 - P-30 - P-30 '-30 - P-30PB1 - P-30PB1 rest Site --04 COPY FOR TESTING - P-04 - P-04 '-04 COPY FOR TESTING - P -04A- P -04A --04 COPY FOR TESTING - P -04A- P -04A WP02 '-04 COPY FOR TESTING - P-041-1 - P-04LI BP Anticollision Report Local Coordinate Reference: Well P-04 TVD Reference: KB @ 91.64usft (P -04A) MD Reference: KB @ 91.64usft (P -04A) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP1 Offset TVD Reference: Offset Datum Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 2,442.91 2,425.00 246.41 2,442.91 2,425.00 246.41 2,444.80 2,425.00 246.46 2,635.60 2,600.00 82.42 479.37 475.00 142.12 471.79 475.00 141.98 775.05 775.00 242.93 775.05 775.00 242.93 2,344.65 2,325.00 388.96 2,344.65 2,325.00 388.96 3,151.82 3,050.00 204.31 136.41 125.00 88.56 434.89 425.00 176.21 491.22 500.00 158.93 491.22 500.00 158.93 11,525.00 11,525.00 0.02 37.84 37.84 0.00 5,900.00 5,900.00 0.00 11,525.00 11,525.00 0.02 1/2019 1:02:43PM Page 4 of COMPASS 5000.1 Build 81D Printed 2011019 11:01:31AM North America - ALASKA - BP Page t of 2 Cementing Report Common Well Name: P-04 / 02 - -- -- - -- - — Project: PBU _- no.: 1 Report date: 1/4/2019 Sde: P - ud Oolemma: 8/11/1891 Event Type: COM- ONSHORE (CON) - - _ Start Date: 1/42019 Ertl Gate fReport FE No.: Contractor. NABORS ALASKA DRILLING INC. Rip NamelNo.: CDR -2 Rig Release: -0197J-C: (979,713.00) BPUOI: USA00001646 Active datum: KB @91.64us8 (above Mean Sea Leve0 General Information Job type. Primary Cement job start date/time: 1/8/2019 2:OOPM Job end dateltime. 1/8/2019 6:00PM Cement Company SCHLUMBERGER Cementer. KEITH PIERCE Cemented Strang. PRODUCTION LINER 1 String Size: 2.875 (in) String Set TMD: 13,602.00 (usR) Hole Size: 4.250 (in) Pipe Movement Pipe Movement: NO MOVEMENT Retailing Time (Start -End): RPM: Rotating Torque (mit/avg/max): (ft-lbo Reciprocating Time (Start -End): Recip Drag Up/Doom - (kip) SPM: Stroke Length. Fluid Name: CEMENT Fluids (1 of 1) Slurry Type: CEMENT Purpose: PRIMARY Class: G -CLASS Description: LEAD SLURRY Density: 15.30 (ppg) Yield: 1.6500 (R/ak) Mix Water Ratio: 5.162 (galisk94) Excess: Mix Method: BATCH Socks Used: 90.50 (941b sacks) Water Volume: 11.1 (bbl) Excess Slurry Volume: 0.0 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: Slurry Volume: 26.6 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type. Density: PV: YP: Viscosity: Gels 10 Sec: Gels 10 Min: Additives Name Type Amount Units Concentration Unit D047 ANTIFOAMAGENT 0.100 GAUSX D206 ANTIFOAMAGENT 0.100 GAusx D065 WEIGHTINGAGENT 1.250 %BWOC D167 FLUID LOSS 0.150 %BWOC D600 G GAS -BLOCK 1.800 GAUSX D178 SILICA 35.000 % BWOC D800 RETARDER AID 0.800 % BWOC Fluid Tab Thick time Thick Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength temp. (cc/30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) (°F) (°F) (Psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) min(psi) °F min 4 43 0.00 80.00 21.0 180.00 Printed 2011019 11:01:31AM Printed 2/7/2019 11:01:31AM North America - ALASKA - BP Page 2 of 2 Cementing Report Common Well Name: P-04 / 02 Report no.: 1 Report date: 1/4/2019 Project: PBU Site: P - Spud Date/Tim : 6/11/1981 Event Type: COM- ONSHORE (CON) Start Date. 1/4/2019 End Date: 1/10/2019 Rig Name/No.: CDR -2 Rig Release: AFE No.: X30197J-C: (979,713.D0 ) Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00001848 Active datum : KB 691.e4usft (above Mean Sea level) aasva Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Tap Bottom Plug Pressure Float Pressure Returns Circulate Cmt Vol to Total Annular no. (usft) (usft) Rate Press. Plug Plug Bumpetl Bumped Held Held Prior Surface Mud Lost Flow (gpm) (psi) (psi) (min) (hr) (bbl) (bbl) Atter pumpiae schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. Pumped Disp. Rete TMD TMD Pmp date/time job Used temp. 1131hatimic temp. (bbl) Rate (bbl/min) (usft) (usft) (act) bbUmin Tach Casing Test Shoe Teat Liner Top Test Test Pressure: (psi) FIT/LOT: (ppg) Liner Overlap: (usft) Time: (min) Tool: N Positive Test. (ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (ppg) Negative Test Tool: N Hours Before Start: (hr) Time before test: (hr) Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBLRun: N Cement Top: (usft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient : N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Him Prior to Log: (hr) How Determined: Printed 2/7/2019 11:01:31AM BA_ KER 0 PRINT DISTRIBUTION LIST HUGHES a GE company COMPANY BP Exploration Alaska Inc. WELL NAME P -04A FIELD Prudhoe Bay Unit COUNTY PRUDHOE BAY BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick.Rider(fthge.com STATUS COMPANY Final Replacement: ADDRESS (FEDEX WILL NOT DELWER TO P.O. BOX) PERSON ATTENTION V RP North Slope. EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 E. Benson Blvd. Anchorage. Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99501 3 Exxon Mobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo F.lias 3201 C Street, Suite 505 Anchorage, AK 99503 4 l State of Alaska -AOGCC Attn: Natural Resources Technician II 333 W. 711 Ave, Suite 100 Anchorage, Alaska 99501 218116 3x239 tse sign and return one copy of this transmittal form to: Exploration (Alaska)Inc. rotechnical Data Center, 1-112-1 ) E. Benson Blvd. :horage, Alaska 99508 or AKGDMINTERNAL@bp.com LOG TYPE GR - RES LOG DATE January 3, 2019 TODAYS DATE January 11, 2019 Revision No Details: Rev. Requested by: --- FIELD / FINAL CD/DVD FINAL PRELIM I (las, dlis, PDF, META, SURVEY REPORT LOGS LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES 1#01- COPIES 14 OF COPIES J 4 4 lu 4 4 5 DNR - Division ofOil & Gas ... Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 **` Stamp "confidential" on all material deliver to or 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, IR2-1 '.900 E. Benson Blvd. (Anchorage, Alaska 99508 Attn: Nancy Landi TOTALS FOR THIS PAGE: 0 2 4 2 0 THE STATE °fALASKA GOVERNOR BILL WALKER John Egbejimba Engineering Team Leader — CTD & RWO BP Exploration (Alaska), Inc. P.O Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU P -04A BP Exploration (Alaska), Inc. Permit to Drill Number: 218-116 Surface Location: 2564' FSL, 2001' FWL, SEC. 31, TI IN, RI 3E, UM Bottomhole Location: 22' FSL, 1473' FWL, SEC. 32, TI IN, RI 3E, UM Dear Mr. Egbejimba: 333 West 7Th Avenue Anchorage, Alaska 99501 Main: 907.297.1433 Fax: 907.276.7542 www,aogcc.olaska.gov Enclosed is the approved application for the permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. 4� DATED this lD day of October, 2018. Sincerely, Hollis S. French Chair RBDMS_ OCT 1 12018 STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMISSI PERMIT TO DRILL 20 AAC 25.005 Ia. Type of Work: ib. Proposed Well Class: Exploratory - Gas ❑ Service -WAG ❑ Service - Disp❑ 1c. Specify if well is proposed for. Drill ❑ Lateral ❑ Stratigraphic Test ❑ Development -Oil 0 •Service -Winj ❑ Single Zone 0 Coalbed Gas ❑ Gas Hytlretes❑ Redrill 0 * Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket 0• Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 295105380 • PBU P -04A ' 3 Address: 6, Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchorage. AK 99519.6612 MD: 13648' TVD: 8910'ss ' PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well Governmental Section). ( ) 7. Property Designation (Lease Number): ADL 028288 8. DNR Approval Number: 13. Approximate spud date: Surface: 2564' FSL, 2001' FWL, Sec.31, T11N, R13E, UM 435' FSL, 3089' FWL, Sec. 32, T11N, R13E, UM 88-016 December 1, 2016 4 Top of Productive Horizon: 9. Acres in Property: 2491 14. Distance to Nearest Property: Total Depth: 22' FSL, 1473' FWL, Sec, 32, T11N, R13E, UM 10450 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 91.64 feet 15. Distance to Nearest Well Open to Same Pool: Surface: x- 631284 y- 5947292 Zone - ASP 4 GL Elevation above MSL: 54.19 feet 80 16. Deviated wells: Kickoff Depth: 11520 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 100 degrees Downhole: 3287 - Surface: 2389 18, Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casino Weioht Grade Couolmo L n th MD TVD MD TVD(including stage data 4-1/2" 3-1/4"x2-7/8" 6.6#/6.5# 13Cr80 STL / TCII 2388' 11260' 8629'ss 13648' 8910'ss 147 sx Class'G' 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 12010 9265 None 11549 8926 None Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20' 42-122 42-122 Surface 2693 10-3/4" 2622 cu It Permafrost 41-2734 41-2691 Intermediate 11503 7-5/8" 1742 cu ft Class'G' 38-11541 38-8920 Production Liner 721 5-1/2" 170 cu it Class'G' 11284 - 12005 8738-9262 Perforation Depth MD (ft): 11509 -11768 Perforation Depth TVD (ft): 8898-9087 Hydraulic Fracture planned? Yes ❑ No 0 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Name Leemhuis. Jacob from without prior written approval. Contact Email Jacob.LeemhuisDbp.cem Authorized Name Egbeiimba, John Authorized Title En ineering Team Leader - CTD 6 RWO Contact Phone +1 907 564 4989 Authorized Signature Date 1 t2. C> 1 g" Commission Use Only Permit Drill Approve cover for other Number: /��'�� API: 50- 029-22180-01-00 Di Qit yquirementster Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbedmet ne, gas hydrees, or gas contained in shales: IS Other: ��P / fS f �-p 35pp 5-t-cr Samples req'd: Yes ❑/ No Mud log req'd: Yes ❑ No JJ Q��V�G 2- tVy r H2S measures Yes IN No ❑/ Directional svy req'd: Yes IR/ No ❑ Spacing exception req'd: Yes ❑ No Q Inclination -only svy req'd: Yes ❑ No iD"/ Post initial injection MIT req'd: Yes ❑ No APPROVED BY Approved by: in 8 THE COMMISSION Date: I r o I IQ '-T/ /&/-3/10 URI V I IN H L Form 10-401 Revised 5/2017 This permit is valid for 24 months from the tl val (20 AAC 25.005(g)) Submit Forth and RUL) OCT 1 1 2018.,o ���aMm Daplicate�_i� To: Alaska Oil & Gas Conservation Commission ,'♦,5V From: Jacob Leemhuis bP CTD Engineer 19L Date: September 19, 2018 Re: P -OA Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack lateral from well P -04A with the Nabors CDR2 Coiled Tubing Drilling rig on or around December 1", 2018. Proposed plan for P -04A: The sidetrack P -04A will be a 2128' horizontal CST. The P -04A sidetrack will be drilled on or around December 1", 2018. The rig will move in, test BOPE and kill the well. The 3.80" dual string window will be milled off a 4-1/2" x 5-1/2" delta whipstock set pre -rig. The well kicks -off in the Shublik and lands in Zone 4. The proposed sidetrack will be completed with a 3-1/4" x 2-7/8" 13Cr solid liner, cemented in place and selectively perforated. Rig Work (scheduled to begin December 1"' 2018) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2389 psi). 2. Mill 3.80"Window+10'ofrathole. 3. Drill production build section: 4.25" OH, '"470' (35 deg DLS planned). 4. Drill production lateral: 4.25" OH, '"1628' (12 deg DIS planned). 5. Pump primary cement job: 30.3 bbls, 15.3 ppg Class G, TOC at TOL (11,260 MD).* 6. Perforate —900' based on drilling logs. 7. Freeze protect well to a min 2500' TVDss. 8. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) Post -Rig Work: 1. V: Pull TWC if set. Tree Work as necessary 2. S: Drift to deviation. Set Live GLVs. Set LTP if required 3. T: New well flowback up to 7 days Mud Program: • Drilling/Completion: a min EMW of 8.6 ppg KCL with Geovis for drilling (723 psi over -balance). Disposal: • All Class 1& II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >ll must go to GNI. Hole Size: • 4.25" for entirety of the production hole section. Liner Program: • 2-7/8", 6.5#, 13Cr solid liner: 12,030' MD —13,648' MD • 3-1/4", 6.6#, 13Crsolid liner: 11,260' MD -12,030' MD • A planned 30.3 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at 11,260' MD). • The primary barrier for this operation: a minimum EMW of 8.6 ppg (723 psi over -balance). • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 3500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 100% inclination at kick off point is 45°. • Magnetic and inclination surveys will betaken every 30 ft. No gyro will be run. • Distance to nearest property — 10,450' • Distance to nearest well within pool — 800' Logging: • MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. Perforating: • Perforating: —900' of perforations, 2", 60 deg random phasing, 6 spf, perf guns. • The primary barrier for this operation: a minimum EMW of 8.6 ppg (723 psi over -balance). • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti -Collision Failures: • None. All offset wells pass BP anti -collision scan criteria. Hazards: • P -pad is considered an H2S pad. Recent 1-12S reading on P-04 is 44 (1/6/2016). Max recorded on the pad/facility: 350 ppm on Y-33 (2/23/2011). , • Lost circulation risk on P -04A is considered Medium. Reservoir Pressure: • The reservoir pressure on P -04A is expected to be 3287 psi at 8980' TVDSS (7.05 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2389 psi. • A min EMW of 8.6 ppg for this well will provide 723 psi over -balance to the reservoir. Jacob Leemhuis CC: Well File CTD Engineer Joseph Lastufka 564-4989 North America - ALASKA - BP PBU P P-04 PLAN P -04A Plan: P -04A WP02 BP Coil Tubing Report 12 September, 2018 BA ERIGI0 BAT GF company Company: North America - ALASKA - BP Project: PBU Site: P Well: P-04 Wellbore: PLAN P -04A Design: P -04A WP02 BP P, TR -11-13 — --- --� Site Position: 623,154.060 usft From: BA ER BP Coil Tubing Report Well P-04, P-04 y HES Ty +N/ -S 0.00 usft GEro»nTm Position Uncertainty Local Co-ordinate Reference: Well P-04 PLAN P -04A TVD Reference: Mean Sea Level MD Reference: KB @ 91.64usft (P-04) P -04A VVP02 - North Reference: True - Version: Survey Calculation Method: Minimum Curvature , Depth From (TVD[ Database: EDM R5K - Alaska PROD - ANCP1 Project PBU, PBU, PRUDHOE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27. OGP-Um AK [4267.15864] Using Well Reference Point Map Zone: NAD27'OGP-Usa AK/Alaska zone 4[26734.158& Using geodetic scale factor Site P, TR -11-13 — --- --� Site Position: 623,154.060 usft From: Map Position Uncertainty: 0.00 usft Well P-04, P-04 Well Position +N/ -S 0.00 usft +EI -W 0,00 usft Position Uncertainty 0.00 usft Wellbore PLAN P -04A Magnetics Model Name Sample Date BGGM2018 12/1/2018 Design P -04A VVP02 - Audit Notes: Version: Phase: Vertical Section: Depth From (TVD[ (usft) 53 80 Northing: 5,949,377.170 usft Easting: 623,154.060 usft Slot Radius: 0.000 in Northing: 5,947,292220 usft i Easting: 631,283.590 usft Wellhead Elevation: 53.80 usft Latitude: Longitude: Gdtl Convergence: Latitude: Longitude: Ground Level: Declination Dip Angle Field Strength 1°I 1°I (nT) 17.02 80.90 57,437 PLAN Tie On Depth: 11 48749 *NI -S +EI -W Direction (usft) (usft) (°) 0.00 000 230.00 70'16'12.612N 149'0'14.402 W 0.94 70° 15'50157 N ' 148° 56' 18.821 W 54.19 usft 9/12/2018 4:32:28PM Page 2 COMPASS 5000.1 Build 81D BP BP Coil Tubing Report BAKER JUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well P-04 Project: PBU TVD Reference: Mean Sea Level Site: P MD Reference: KB @ 91.64usft (P-04) Well: P-04 North Reference: True Wellbore: PLAN P -04A Survey Calculation Method: Minimum Curvature Design: P -04A WP02 Database: EDM RSK- Alaska PROD -ANCP1 Survey Tool Program Date 9/12/2018 From To (usft) (usft) Survey (Wellbore) Tool Name Description 50.30 11,48749 P-04 Srvy 1 GCT -MS (P -D4) GCT -MS Schlumberger GCT multishot 11,487.49 13,647.58 P -04A WP02(PLAN P.04A) MWD MWD -Standard Planned Survey MD Inc Azi TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) V) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 11,487.49 44.98 12471 8,790.66 -2,060.11 6,001.37 5,945,337.225 637,319.487 0.00 -3,273.10 P-04 Actual Survey 11,500.00 45.07 124.51 8,799.50 -2,065.14 6,008.68 5,945,332.326 637,326.857 1.31 -3,275.45 11,507.79 45.12 124.39 8,805.00 -2,068.26 6,013.20 5,945,329.287 637,331.458 1.31 -3,276.93 TSGR 11,515.29 45.17 124.27 8,810.29 -2,071.26 6,017.60 5,945,326.364 637,335.901 1.31 -3,278.37 P-04 Actual Survey - TIP 11,520.00 45.14 124.20 8,813.61 -2,073.14 6,020.36 5,945,324.534 637,338.694 1.23 -3,279.27 KOP - 5117' x 7 618" Dual String Exit - TOWS -2,073.35 -3,279.38 11,536.35 46.61 124.20 8,825.00 -2,079.74 6,030.07 5,945,318.106 637,348.517 9.00 -3,282.47 TSHU 11,540.00 46.94 124.20 8,827.50 -2,081.23 6,032.26 5,945,316.652 637,350.739 9.00 -3,283.19 Start Build 35.00 11570.00 57.44 124.20 8,845.86 -2,094.53 6,051.84 5,945,303.693 637,370.542 35.00 -3,289.64 Start OLS 35.00 TFO 10.00 11,600.00 67.80 126.16 8,859.64 -2,109.87 6,073.57 5,945,268.732 637,392.535 35.00 -3,296.42 11,649.73 85.00 128.88 8,871.29 -2,139.23 6,111.73 5,945,260.049 637,431.199 35.00 -3,306.79 Start Tum 35.13 11,700.00 85.00 146.54 8,875.68 -2,176.13 6,145.30 5,945,223.742 637,465.401 3500 -3,308.78 11,800.00 65.00 181.67 8,884.39 -2,270.45 6,172.15 5,945,129.915 637,493.897 34.99 -3,268.73 11,900.00 85.00 216.80 8,893.11 .2,363.04 6,139.85 5,945,036.782 637,463.211 34.99 -3,184.46 TFace 1°I 0.00 -58.78 -58.64 -58.55 -121.18 0.00 0.00 0.00 10.00 9.10 90.78 91.58 91.58 91122018 4:32:28PM Page 3 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP Project: PBU Site: P Well: P-04 Wellbore: PLAN P -04A Design: P -04A WP02 Planned Survey Tubing Report MD Inc (usft) (1 11,979.08 85.00 TEIL 12,000.00 85.00 12,01973 85.00 Start DLS 12.00 TFO 140.00 12,034.46 83.65 TSAD 12,049.70 82.25 Start DLS 12.00 TFO 90.00 12,100.00 82.29 12,200.00 82.63 12,201.52 82.64 45N TVD Reference: 12,217.22 82.72 45P 12,300.00 83.30 12,319.70 83.46 Start DLS 12.00 TFO 30.00 12,381.15 89.86 Invert #1 12,382.52 90.00 Start DLS 12.00 TFO -40.00 12,400.00 91.61 12,491.70 100.00 Start Tum -12.19 12,500.00 100.00 12,557.50 100.00 45P Minimum Curvature 9/1212018 4: 32:28PM Page 4 COMPASS 5000.1 Build 81D BP BVER BP Coil Tubing Report UGHES cero,nPnw Local Co-ordinate Reference: Well P-04 TVD Reference: Mean Sea Level MD Reference: KB @ 91.64usft (P-04) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Azi TVDSS NIS ENV Northing Easting DLeg V. Sec TFace (°) (usft) (usft) (usft) (usft) (usft) (°I100usft) Waft) (°) 244.58 8,900.00 -2,412.46 607949 5,944,986.320 637,403.727 34.99 -3,10646 91.23 251.93 8,901.82 -2,420.18 6,060.14 5,944,978.270 637,384.523 35.00 -3,08668 90.34 258.86 8,903.54 .2,425.13 6,041.14 5,944,972.987 637,365.608 35.00 -3,068.94 90.30 260.00 8,905.00 -2,427.82 6,026.73 5,944,970.048 637,351.246 12.00 -3,056.17 140.00 261.19 6,906.87 -2,430.29 6,011.81 5,944,967.318 637,336.377 12.00 -3,043.16 139.89 267.28 8,913.64 -2,435.29 5,962.24 5,944,961.453 637,286.905 12.00 -3,001.97 90.00 279.38 8,926.81 -2,429.53 5,863.46 5,944,985.488 637,188.049 12.00 -2,930.00 89.18 279.57 8,927.00 .2,429.28 5,861.98 5,944,965.710 637,186.563 12.00 -2,929.02 87.59 281.47 8,929.00 -2,426.44 5,846.67 5,944,968.285 637,171.206 12.00 -2,919.12 87.56 291.46 8,939.10 -2,403.18 5,767.97 5,944,990.164 637,092.123 12.00 -2,873.79 87.32 293.83 8,941.37 -2,395.65 5,749.92 5,944,997379 637,073.941 12.00 -2,864.80 86.10 297.51 8,944.95 -2,369.09 5,694.66 5,945,022.974 637,018.236 12.00 -2,839.55 30.00 297.59 8,944.95 -2,368.46 5,693.45 5,945,023.584 637,017.016 12.00 -2,839.02 29.79 296.24 8,944.71 -2,360.54 5,677.87 5,945,031.224 637,001.293 12.00 -2,832.17 -40.00 289.08 8,93543 -2,325.41 5,593.83 5,945,064.886 636,916.665 12.00 -2,790.38 -00.02 288.07 8,933.99 -2,322.80 5,586.08 5,945,067.355 636,908.870 1200. -2,786.12 -89.91 281.06 8,924.00 -2,308.57 5,531.31 5,945,080.630 636,853.863 12.00 -2,753.31 -89.37 9/1212018 4: 32:28PM Page 4 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP Project: PBU Site: P Well: P-04 Wellbore: PLAN P -04A Design: P -04A WP02 Planned Survey TVDSS MD Inc ENV (usft) 1°1 Easting 12,569.00 100.00 45N (°) 12,571.70 100.00 Start DLS 12.00 TFO .130.00 12,600.00 97.81 12,66940 92.37 Revert #1 279.66 12,699.53 90.00 Start DLS 12.00 TFO .140.00 12,700.00 89.96 12,748.52 85.50 Start Turn -12.04 279.33 12,800.00 85.50 12,846.75 85.50 45N 12.00 12,872.20 85.50 45P 8,917.16 12,900.00 85.50 12,948.52 85.50 Start Turn 12.04 -2,725.66 13,000.00 85.50 13,100.00 85.50 13,148.52 85.50 Start DLS 12.00 TFO 40.00 1200. 13,170.00 87.48 Invert#2 8,910.37 13,197.40 90.00 Start DLS 12.00 TFO -60.00 13,200A0 90.16 BP BP Coil Tubing Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: BAKER , UGHES Well P-04 Mean Sea Level KB @ 91.64usft (P-04) True Minimum Curvature EDM RSK - Alaska PROD - ANCP1 Azi TVDSS NIS ENV Northing Easting DLeg V. Sec TFace (°) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) (°) 279.66 8,922.01 -2,306.53 5,520.17 5,945,082472 636,842.689 12.00 -2,746.08 -89.93 279.33 8,921.54 -2,306.09 5,517.55 5,945,082.864 636,840.063 12.00 -2,744.36 -90.17 276.71 8,917.16 -2,302.20 5,489.86 5,945,086.278 636,812.316 12.00 -2,725.66 -130.00 270.37 8,911.00 -2,297.95 5,420.93 5,945,089.320 636,743.324 1200. -2,675.58 -130.41 267.64 8,910.37 -2,298.48 5,390.82 5,945,088.271 636,713.228 12.00 -2,652.17 -130.97 267.60 8,910.37 .2,298.50 5,390.34 5,945,088.243 636,712.757 1200 -2,651.80 -140.00 263.85 8,912.30 -2,302.10 5,34202 5,945,083.794 636,664.508 12.00 -2,612.46 -140.00 257.65 8,916.34 .2,310.35 5,291.39 5,945,074.670 636,614.031 12.00 -2,568.38 -90.24 252.03 8,920.00 .2,322.53 5,246.42 5,945,061.705 636,569.288 12.00 -2,526.10 -90.23 248.96 8,922.00 -2,331.00 5,222.51 5,945,052.819 636,545.529 12.00 -2,502.34 -90.12 245.61 8,924.18 -2,341.70 5,196.95 5,945,041.677 636,520.160 12.00 -2,475.88 -90.12 239.77 8,927.99 -2,363.88 5,153.99 5,945,018.754 636,477.598 12.00 -2,428.71 -90.23 245.97 8,932.03 -2,387.27 5,108.33 5,944,994.571 636,432.360 1200. -2,378.70 90.24 258.01 8,939.87 -2,418.03 5,013.70 5,944,962.164 636,338.285 12.00 -2,286.43 90.47 263.85 8,943.68 -2,425.65 4,965.96 5,944,953.714 636,290.687 12.00 -2,244.96 90.23 265.51 8,945.00 -2,427.64 4,944.61 5,944,951.355 636,269.378 12.00 -2,227.33 40.00 267.62 8,945.60 -2,429.28 4,917.27 5,944,949.238 636,242.074 12.00 -2,205.34 39.90 267.35 8,945.60 -2,429.40 4,914.67 5,944,949.078 636,239.478 12.00 -2,203.27 -60.00 9/12/2016 4:32'28PM Page 5 COMPASS 5000.1 Build 81D Company: North America - ALASKA - BP NIS Project: PBU Northing Easting Site: P V. Sec TFace Well: P-04 (usft( (usft) Wellbore: PLAN P -04A (usft) (°/t00usft) Design: P -04A WP02 (°( 8,941.94 Planned Survey 4,834.38 5,944,938013 MD Inc Azi -2,135.55 (usft) 8,940.29 -2,443.07 13,281.05 95.00 258.90 Start Turn -12.05 -2,118.85 -89.90 13,300.00 95.00 256.62 13,400.00 95.00 244.57 13,421.05 95.00 242.03 Start Turn 12.05 4,703.41 5,944,889.280 13,500.00 95.00 251.55 13,600.00 95.00 263.60 13,647.58 95.00 269.33 TD at 13647.58 -1,930.15 89.58 BP BP Coil Tubing Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: BAKER 10 gUGHES cE,n.,v Well P-04 Mean Sea Level KB @ 91.64usft (P-04) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 7VOSS NIS E/W Northing Easting DLeg V. Sec TFace (usft) (usft( (usft) (usft) (usft) (°/t00usft) (usft) (°( 8,941.94 -2,439.06 4,834.38 5,944,938013 636,159.371 12.00 -2,135.55 -60.00 8,940.29 -2,443.07 4,815.93 5,944,933.691 636,141.001 12.00 -2,118.85 -89.90 8,931.58 -2,476.10 4,722.15 5,944,899.027 636,047.811 12.00 -2,025.77 -8947 8,929.74 -2,485.52 4,703.41 5,944,889.280 636,029.244 12.00 -2,005.36 -89.89 8,922.86 -2,516.48 4,631.21 5,944,857.070 635,957.603 12.00 -1,930.15 89.58 8,914.15 -2,537.88 4,534.11 5,944,833.980 635,860.893 12.00 -1,842.01 89.47 8,910.00 - -2,540.81 4,486.82 5,944,830.234 635,813.668 12.00 -1,803.90 89.75 91122018 4: 32:28PM Page 6 COMPASS 5000.1 Build 81D BP BP Coil Tubing Report BF�UGHES GE w,m Company: North America - ALASKA- BP Local Co-ordinate Reference: Well P-04 Project: PBU TVD Reference: Mean Sea Level Site: P MD Reference: KB @ 91.64usft (P-04) Well: P-04 North Reference True Wellbore: PLAN P -04A Survey Calculation Method: Minimum Curvature Design: P -04A VVP02 Database: EDM RSK- Alaska PROD -ANCP1 Plan Annotations Measured Vertical Local Coordinates Depth Depth -NI-S iEl-W (usft) (usR) (usfq (usft) Comment 11,487.49 8,790.66 -2,060.11 6,001.37 P-04 Actual Survey 11,515.29 8,810.29 -2,071.26 6,017.60 P-04 Actual Survey - TIP 11,520.00 8,813.61 -2,073.14 6,020.36 KOP 11,540.00 8,827.50 -2,081.23 6,032.26 Start Build 3500 11,570.00 8,845.86 -2,094.53 6,051.84 Start DLS 35.00 TFO 10.00 11,649.73 8,871.29 -2,139.23 6,111.73 Start Tum 35.13 12,019.73 8,903.54 -2,425.13 6,041.14 Start DLS 12.00 TFO 140.00 12,049.70 8,906.87 -2,430.29 6,011.81 Start DLS 12.00 TFO 90.00 12,319.70 8,941.37 -2,395.65 5,749.92 Start DLS 12.00 TFO 30.00 12,382.52 8,944.95 -2,368.46 5,693.45 Start DLS 1200 TFO-40.00 12,491.70 8,935.43 -2,325.41 5,593.83 Start Turn -12.19 12,571.70 8,921.54 -2,306.09 5,517.55 Start OLS 12.00 TFO-130.00 12,699.53 8,910.37 -2,298.48 5,390.82 Start DLS 12.00 TFO -140.00 12,748.52 8,912.30 -2,302.10 5,342.02 Start Turn -12.04 12,948.52 8,927.99 -2,363.88 5,153.99 Start Turn 12.04 13,148.52 8,943.68 -2,425.65 4,965.96 Start DLS 12.00 TFO 40.00 13,197.40 8,945.60 -2,429.28 4,917.27 Start DLS 12.00 TFO -60.00 13,281.05 8,941.94 -2,439.06 4,834.38 Start Turn -12.05 13,421.05 8,929.74 -2,485.52 4,703.41 Start Turn 12.05 13,647.58 6,910.00 -2,540.81 4,486.82 TD at 13647.58 91122018 4'32:28PM Page 7 COMPASS 50001 Build 81D North America - ALASKA - BP PBU P P-04 PLAN P -04A Anticollision Summary Report 12 September, 2018 BA ER00 F�UGHES a GE company Company: North America - ALASKA - BP Project: PBU Reference Site: P Site Error: O.00usft Reference Well: P-04 Well Error: 0.00usft Reference Wellbore PLAN P -04A Reference Design: P -04A WP02 BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: Norm Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well P-04 KB @ 91.64usft(P-04) KB @ 91.64usft (P-04) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum JUGHES GE co ,, 'eference P -04A WP02 liter type: NO GLOBAL FILTER: Using user defined selection & filtering cdtena aerpolation Method! MD Interval 25.00usft Error Model: ISCWSA iepth Range: 11,487.49 to 13,647.58usft Scan Method: Tray. Cylinder Norm '.esuhs Limited by: Maximum center -canter distance of 1,560.97usft Error Surface: Elliptical Conic Survey Tool Program Date 9/12/2018 From To (usft) (usft) Survey (Wellbore) Tool Name Description 50.30 11,487.49 P-04 Srvy 1 GCT -MS (P-04) GCT -MS Schlumberger GCT multishot 11.48749 13,647.58 P -04A WP02(PLAN P -04A) MWD MWD -Standard Summary Site Name Offset Well - Wellbore - Design P P-01 - P -01A - P -01A P-01 - P-01APB1 - P-01APB1 P-01 - P-01APB2 - P-01APB2 P-01 - P-01APB3 - P-01APB3 P-03. P-03 - P-03 P-03 - P -03A - P -03A P-03 - P-03AP81 - P-03APB1 P-03 - P-03APB2- P-03APB2 P-04 - P -D4 - P-04 P-04 - P -04L1 - P-0411 P-04 - PLAN P -04A - P-D4A P-05 - P-05 - P-05 P-05 - P -05A- P -05A P-05 - P-05PB1 - P-05PBI P-15 - P-15 - P-15 P-15 - P-151_1 - P-051_1 P-22 - P-22 - P-22 P-26 - P-26 - P-26 Y Y-27 - Y-27 - Y-27 Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 11,787.49 11,925.00 240.79 11,787.49 12,100.00 371.33 No -Go Allowable Distance Deviation Warning (usft) from Plan (usft) Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 11.46 240.79 Pass-NOERRORS 0.67 371.33 Pass-NOERRORS Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 12,08749 12,700.00 916.64 347.13 57567 Pass - Major Risk 9/122018 2: 08:27PM Page 2 of 3 COMPASS 5000.1 Build 81D Company: North Amenca- ALASKA -BP Project: PBU Reference Site: P Site Error: O.00usft Reference Well: P-04 Well Error: OAOusft Reference Wellbore PLAN P -04A Reference Design: P -04A WP02 BP Anticollision Report Local Coordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well P-04 KB Q 91.64usft (P-04) KB @ 91.64usft (P-04) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum BATVER a, ieference Depths are relative to KB C 91.64usft (P-04) Coordinates are relative to P-04 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27' OGP-Usa AK ventral Meridian is 150° V0 000 W ° Grid Convergence at Surface is: 1.00° in in 1200 0 0 a 2 re C1 Uw 800 LD U 0 H aei 400 U Ladder Plot LEGEND ,P-20APBI V2 -d- P-24,P-24PB1,P-24PB1V11 -A- 68- $ P-20,P-20B,P-20BV8 $ P -15,P -15,P -15V3 -� P -07,P -07,P -07V4 -�- P-07,P-07A,P-07AV3 $ P-08, P-0SA, P -08A V2 $ P-08,P-0SAPB1,P-0eAP81 V1 �♦ P -08,P -08,P -08V1 �(- P-09, P-09, P-09 V1 -rem P -09,P -091.1,P-091-1 V3 -4- P-02,P-02APB1, P-02APB1 V3 $ P-02,P-02A,P-02AV5 O P--2�255,P-299555L1,V555dbi V7 1ADP-28,P-28,P-J§% PNfEaSt7fe RQEPf1(25Oo Urn)$ P -13,P -13,P-13\11 $ P-11,P-11L1PB1,P-11 1PB1 VO $ P -01,P -01,P-01 V3 $ P -11,P -11,P-11 V1 -3- P-11,P-11L1PB2,P-ll L1PB2VO $ P-27, P-27, P-27 V21 $ P-18,P-18L1,P-18L1 V3 $ P -18,P -18,P -18V3 -X- P-30,PJ0PBI,P-30PB1 VO �- P-30, P-30, P-30 VO $ P-05, P-05, P-05 V1 $ P-05,P-05P81,P-05PB1 V6 -6- P-01,P-01APB3,P-01AP83V0 $ P-01,P-01APB2,P-01AP132V0 $ P-01,P-01APB1,P-01APB1 VO $ P -26,P -26,P-26 V5 $ P -10,P -10,P -10V1 -F P-10,P-10A,P-10AVO -� P -12,P -12,P -12V1 -% P-1 2. P-1 2APB2, P-12APB2 V1 $ P-12,P-12APB1, P-12AP81 V2 911212018 2:08.27PM Page 3 of 3 COMPASS 5000 1 Build BID 0 hp Project: PBU Sale: P Well. P -O4 WeBuens, Pi -ANP -0 Plan:P WPMW-04IPILANFIYM) MILL DETALS. P 4 GmunOLeesl: 54.19 •NFS •EFW NoM'mg Easing Le01WEe Loamude Dun 0.00 .7292.230 5]1263.590 70"15'50]57N 148"56-16821W Yo- awmalo.n.Il A F 50a9N `+IWSS paM. azfl awl. n,Au Wcrnm WELLBORE DETAILS: PLAN P. I1EffflBKf 4AG1eM)gN P -04A CgaamNMn:lllmerew. weYPo4.ilue Nam AMtlOTATIONS YeNw'11`NlflYamm: Yas Sw feral Parent Wellbore: P-04 em slq.ryoox.00061 s xmnlW)flbum To gn MD: 11487.49 Mmwme NVll fltlamw rc6N91swan1Pa1 TFace VSed Target U.1a.A All Mnlmlm C.reN�e x71.1 SECTIONDETAILS x]su stare ald 15 AMtlOTATIONS Sec MD Inc At wTVD •NIS •EI -W Deg TFace VSed Target TVD MD Annolatian 1 11487.49 44.90 12471 079066 -2060.11 600137 000 000-3273.10 8790661148749 PO4 Actual Surrey 2 1151529 45.17 124.27 881029 -2071.26 601760 1.31 -58.78327837 8010291151529 PO4 Actual Survey TIP 3 11520.00 45 ]4 124.20 881361 -207314 6020.36 1.23 -121.18327927 88136111527.00 NOP 4 1154000 4694 12420 882750 -2081.23 603226 900 0.003283.19 8827 5011540 00 Start BuM 3500 5 1157000 5744 12420 884586 .2054.53 605184 35.00 000 -320954 0845861157000 San DLS 35 TO TFO 1000 "11649.73 85.00 128.88 887129 .2139.23 611173 35.00 1000 3306.79 88712911649.73 Start Turn 35.13 7 1201973 85.00 258.85 890354 -2425.13 604114 3500 90.00 -336894 8903541201973 San DLS 12 W TFO 14000 8 12049.70 8225 261.19 090687 .2430.29 61 1200 140.00-3043.16 8906 87 12049,70 SIaitDLS 1200 TFO 9000 9 1231970 83.46 29383 894137 -2395.65 574992 1200 90.00 286480 89413712319.70 Start DIS 1200TFO 3000 10 1230252 90.00 29759 094495 -236846 5693.15 1200 30.00 283902 89449512382.52 Start DLS 1200 TFO 4000 11 1249170 10000 28908 8935.43 -232541 559303 12 OD 40.00-2790.30 89354312491,70 SIarITum-1219 12 1257170 10000 27933 892154 -2306.09 551755 1200 -9000 274436 8921541257170 StudDLS1200TFO-73000 13 12699.53 9000 26764 891037 229848 539082 1200 -13000 2652.17 8910 37 12699 53 StarIDLS1200TF0-14000 14 1274852 8550 16385 891230 -230210 534202 1200 -04000 `261246 8912301274852 Straffrin-1204 15 1294852 8550 23977 892799 -236388 515399 12011 -90W 2428.71 9927 99 12948,52 SIzrITum1204 16 1314852 8550 263.85 894368 242565 496596 IUD 90.00 224496 89436813148.52 Sta110L51200TF04000 17 1319740 9000 267.62 894560 -2429.28 491727 1200 40.00 220534 8945601319740 Start DLS 1200 TFO 6000 18 1320105 9500 25890 894194 -2439.06 463438 1200 60.00 .2135 8941941328105 StarlTum-1205 19 1342105 9500 142.03 8929.74 -2485.52 4703.41 12.W1 -9000-200536 8929 74 13421,05 Start Turn 12.05 20 1364758 9500 269.33 891000 .254081 448682 1200 90.00 -1803.90 891D0013647.58 TD at 13647.58 x71.1 � x]su stare ald 15 ,awls i W lvO lua. PMnamllau,-nr xIN _ x'110 Y7i114 DU .Ymnpl:vn-ItIWn' 11 1.11111 s-1 Tim 3511 - - 1181' X0.11 p 4WU MA l'1 o: P-04AFault 1 Yl n $sP *- n �a",`nnRlYz P -04A FeW12 u m smAnts lxuul Ph 1405. � r sIM DUS 12a IR)WW w nl j H v1'u .1" 120D � -IOW 16gD P -u -ism p 4WU P-04AFault 1 *- L CO" 74W P -04A FeW12 r y 78W BAKE ES P -04A WP02 51 /Z" r) 5/8" Uual Sv ing E ail -TOW S n Y-04 P-041.1 P-WATI P4 AT3 PA AT2 P -04I O PA ATS U1 P -04A WP02 a6ro0 -320 P-1111.1 In1.1P -34M +) -36W Y -IB P -151-I -3BW I'-141,1 jr"IS 34W 3500 38011 4000 42W MOU 4600 48M 5000 5248 54M 5600 56W mutt 62M 6,100 6600 68M 7000 West( -)/East(+) (200 ustl/in) P -04A WP02 .A 11 PAli A T2 'fimtm, u. 6lan'mm mw AWn'rmo-1219 l %an Tam -1204 YIrn0L5 12aTI040an slwlm Y 13W00.1400 suet We II GO W.3n 00 .All 1'+NA WIYI. na4ATJ ,A'rum li as tiW ram -1105 Alault512.111'f1-ria. Uol l]W]ix 1. DIA r21U'11114U W 92nn- Me6nse9llfYgl-34uu d>5V J)a -llsu 2x21 ."ll -JIW -3u1u -1. M. -2wm -1050 .I8W .2750 -2IDu 'esu -MOu -sW -2500 -1430 -2000 Q150 1)pa ..30 :71X1 -21Au -21a =050 -air;. -Ivw -I'N. -Ins. aaa n50 -Ila -1(011 ... -15511 Vertical Section at 230.00° (50 usfl/in) 016 re J)p Project: Pau Site: P Well: P-04 Wellbore: PLAN P-0 A Plan: P -04A WP02 (P-041PLAN P44A) 03 ANTLCODUSION SETTINGS ^ P-09, "War, "Wal Vt COMPANY DETAILS: NOMAnaaica-ALAWIA-BP IMerpoleaan McMod: MO,interral:26.00 • P-30, P30, P-30 W Calaleaon MCMad Minimumcumane Depta Range From: 11487.49 To 13647.5a ^ P42. R12911, P-12MI W Encir Stearn ISCIASA Results Unrilet By: Centre Entrance: 1560.97 • P-14, P-14, 0.14 V1 San Method Tn, Cygnter Nonh Reference: Ran: 0.04A M02(P-04RLAN PU4A) - P-01. P WU, 0.01APB2 W Ener Surface: EI9p0cYCOnic > P-20, P40A P20A V1 - PL9, PW, P -(n) V1 blaming Metbad Rules Beset Ladder Plot Measured Depth (100 usfttin) gAJUGHES From Colour To MD 11487 -11800 11800-- 11900 11900— - --13648 • P O P-IDM131, P-20AP01 W ^ P-09, "War, "Wal Vt • P W, P 06A, P -WA V5 - 0.25. P35, 0.25 VS • P-30, P30, P-30 W • 0.15, P -06A P-1 W W • Pot, P'01APB3, P-01gPB340 ^ P42. R12911, P-12MI W P-20. 0.20. P -2p V1 - P P4, P48 V1 • P-14, P-14, 0.14 V1 - P-11, P-11OP181, P -111-I 31 VO - P-05, Po5, PAS Vt - 0.15, P-16, 0.16 V1 - P-01. P WU, 0.01APB2 W - P-12, R128, P-129 V5 > P-20, P40A P20A V1 - PL9, PW, P -(n) V1 P -IT R1711, 0.1]1-1 VO - P-11. P -11L1, 1 1110 W - P-05, P45PB1, P -05P31 W - X19, P-19,1-19 • P-01, PL26,12 , P-01APB1 W - P41, P -4A, V1 - P-20 P-20& Vfi • P49, PoBL1, P-091-1 W • P -M R17, P-17 V3 • P-11, P-11, YI • P4S, PUSH 0.05.4 Vi - P-19. P -19L1. 91 W • Pd6, 0.26, 0.26 VS 4 P-OLL1, P4I Vt -15 V - 0.15, PAS P -t5 V3 - P-02, P g P-02APB1 V3 • 0.23 P-29 P-33 V1 lie - 0.11, P -27. 1P02, LtPB2 VO - P-03, P-03.132 RWMBt - P-18, BI, P1 PBt, 0.iBL1PB1 W - P-10, P-10, P-10 lr P-04 PLAN ,k c 0. PU4q W - P-15. P-15Lt07 ..P-02. P0Q, PUW -G =0.23,1Pe, P-23AV0•P-2], 0.2],P3]V31 I -PL3 PA3MB2 P-0W82W W -+ 0.38, P -2B, R2a V0 Fr4rS, A -P-10. P10A0.10V1 Fr .. P -0a, P -W, PM Vfi • P07, P -p], 0.0] V4 V4 • PA3, P-03, P -02V1 24%13q%mR s 0.34, 0.Z4P91, P-24PBt Vtt . P-1 S. 0.191-1, P16L1 W . PUi Po3A PASA W • P-13, R13. 0.1] Vt . P-4. R4. P -R Vt - Y-37, V -P, Y -P V1 • P-07, P -07A Po]A V • 0.06, PLB N. Vt P-24, P-24, P-24 V1 - 0.18.0.16, P-18 W - P-0} P-03, P-03 V1 - P-01, P-01,0.01 W . P-12. P -I2 Z, 0.120PB2 V1 • P-2; P-22, P-22 Vt o POa P-0BA P08AW . R06, PMB, PLEB V4 •• P25, 0.251-1, 0.2511 W - P10, 0. OPB1, P-30PB1W « 0.16 P-16PPB1. P-Iwel VO - P-01, MIA, 0.01AW -•P-02,P-02M111, 0.12APB1W PU4A M02 Project: PBU ANTI -COLLISION SETTINGS COMPANY DETAILS: North Americe-ALASKA-BP J BA ER Q 0 by Site: P Interpolation Method: MD,interval:25.00 Calculation Method MinimumCurvaWre L GHES Well: P-04 Depth Range From: 11487.49 To 13647.59 Error System: ISCWSA Wellbore: PLAN P.04A Results Limited By: Centre Distance: 1560.97 Scan Method: Tran. Cylinder North Plan: P-04AWP02(P-04/PLAN P.04A) Reference: Plan: P-04AWP02(P-04/PLAN P -04A) Error Surface: Elliptical Conic Wamin Method: Rules Based Depth Range: 11487.49 To 13647.58 From DGIGMr To 11487-- -11818 00 Possible Magnetic Interference: 00 11800 11900 From KOP to 11,800' MD 39A �- 11900 -13648 Contaptlnto: 25 Jose Va79ue7 Tech SuppOrnWeIIF 7144784339 Cel Phone Tai Sturdivant DD Coordinator 907-20562`]4 Cell Phone Patrick Rioer MWDCoordinator 9079523497 Cep Phone Carl UNch Operations Manager 907-382-5534 COPho. .. Lewy 44.1; .wa .64v Noma.; a..a; wmm. _a,.i no; aw 9M72lia. u1:uM4 rrlsmrnN I.P.1.421W see MD m; Azi TVD .Nls «E.w Child TF.. VSW 1 11487.49 44.90 124.]1 8780.66 .2060 11 6001.37 0.00 0.00 .3273.10 2 11515.29 45.17 12d.T1 8810.29 4071.26 6017.60 1.31 -58.70 .327837 3 11520.00 45.14 124,20 8813.61 -2073.14 6020.36 1.23 -121.18 .32]9.2] 4 11540.00 46 94 124.20 0827.50 -2081.23 6032.26 9.00 0.00 -3203.19 5 115]0.00 5].44 124.20 BB46.86 2084.53 6051.04 35.00 0.00 .3289.64 B 1164953 x5.00 128.88 8871.29 -2139.23 6111.73 35.00 10.00 -330629 7 1201 .7385.00 258.86 8903.54 -2425.13 041.14 35.00 9000 -3060.94 8 12049.70 82.25 261.19 8906.07 -2430.29 6011.81 12.00 140.00 -3043.16 912319.]0 83.46 293.83 8941.37 -2395.65 5749.92 12.00 90.00 -2864.80 10 12382.52 90.00 297.59 8944.95 -2388.46 569345 12.00 30.00 -2839.02 11 12491.70 100.00 289.08 0935.43 .2325.41 5593.83 12.00 -40.00 -2790.38 12 125]1.70 100.00 279.33 0921.54 -2306.09 5517.55 12.00 -90.00 -2744.36 13 12699.53 90.00 267.64 8910.37 -229B.48 5390.82 1200 -130.00 -2652.17 14 12740.52 85.50 263.05 8912.30 -2302.10 5342.02 12.00 -140.00 .2612.46 15 12940.52 05.50 239.77 5927.99 -2363.88 5153.99 12.00 -90.00 -2428.]1 16 13140.52 85.50 263.85 8943.68 -2425.65 4965.96 12.00 90.00 2244.96 17 13197.40 90.00 26762 8945.60 -242928 4917.27 12.00 40.00 .2205.34 18 13281.05 95.00 2511,90 8941.94 4438.08 4034.30 12.00 60.00 -2135.55 19 13421.05 95.00 242.03 8929.74 -2485.52 4703.41 12.00 -90,00 -2005.36 20 13647.58 95.00 269.33 8910.00 -2540.81 4406.82 12.00 80.00 -1803.90 SIIRYEt'gpGRAY gytll Fran 0,011 To Somwr , iad 50.30 1148]49 N(e"13M-MS(l GCT -MS 114erl9 13647.5a Pmuvaoz (PIPN Pd4AI MVA 00 LEGEND 180 • P.m, eL , Pmu v,. v -n, v -n, rm v1 20 240 60 ., aw, PAI. P-oa A 180 Azimuth from North [a] vs Centre to Centre Separation [10 usft/in] Azimuth from North rl as Centre to Centre Separation 140 us0llnl 20 North America - ALASKA - BP PBU P P-04 PLAN P -04A P -04A WP02 Plus 500ft MD AOGCC Offset Well Report 12 September, 2018 BA ER 021 HaUGHES GE company Company: North America - ALASKA - BP Project: PBU Reference Site: P Site Error: O.00usft Reference Well: P-04 Well Error: O.00usfl Reference Wellbore PLAN P -04A Reference Design: P -04A WP02 Plus 500ft MD BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well P-04 Mean Sea Level KB @ 91.64usft (P-04) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum BqUGHES GE,.,, Reference P -04A WP02 Plus 500ft MD Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 11,487.49 to 14,147.58usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic Survey Tool Program _-- Data 9/12/2018 From To (usft) (usft) Survey (Wellbore) Tool Name Description 50.30 11,487.49 P-04 Srvy 1 GCT -MS (P-04) GCT -MS Schlumberger GCT multishot 11,487.49 14,147.58 P -04A WP02 Plus 500ft MD (PLAN P -04A MWD MWD -Standard Summary Site Name Offset Well - Wellbore - Design P P-04 - PLAN P -04A- P -04A WP02 y Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft( (usft) (usft( 13.625.00 13,625.00 000 9/122018 4: 22 54P Page 2 of 2 COMPASS 5000.1 Build 81D WELLBORE DETAILS: PLAN P-04A Protect: PBUSite: �. - V11MeKAbeER Yry`WNleore: sstimlve�8derexa sbi yUGHM%an: rsebmxe ee " Nk ^^"^+ P P.00 M.a SJIS]AES� ��b.. PLANP-04A 0 ao ny�mreeoepn P-04AWP02%usfi00NM0 P-O/IPLAN P94A ( I WII,/<, rnme Easton RW usPLnl Easling (200 uabn) Mean Sea Leval TREE= 4-1/16'FTSCIIN VVI = CNV AC:RYITOR= BAKBRC INIAL KB. E E 91.64' OF. B.EV = 55.26' KOP= 17W wxAnple = 98' @ 13050 Datum MD= 11501' Datum TVD = 8800 SS 273V Minimum ID = 2.38"@11537' 2-7/8" LINER CONNECTIONS ITOP OF 5-12' LN1R 4-1/2' TBG, 12.69. NT -1315R TDM, .0152 bpf, D = 3.958' 22-7/8LNR, 11531' 1= 8.875' 11541' ORATION SUMMARY REF LOG: AWS BHCA ON 0626/91 ANGLE AT TOP PERF: 45' (9 11509' We: Refer to Production DB for historical perf data SIZE I SPF I INTERVAL I Opn/Sgz SHOT SCIZ P-04 35/8' 6 DATE O05/18933-38' 3110 3010 37 6 O11537 07/16191 07/13/17 3-38' 4 I'11=11692 11692-11712 O 07/16/91 DOME 318' 4 11722-11768 O 0711281 7163 P -04L1 2' 4 11750 - 12420 O 08 AW 2 2-78' 1 SLID 11748-13097 O 05/02!00 BK P-04 L1 w SAFE1 . NOTES: WELL ANGI 70° @ 11694* CHROME TBG 6 LNR — GAS LFT III ISS ST M) ITVDIDEVITYPEI 7-58' X 4-12' TNV HBBP Wlk D = 4-0- 11237- VLV LATCH F1DRi DATE 5 3110 3010 37 CA DOBE BI( 12 07/13/17 4 6765 5456 50 CA DOME BK 16 07113/17 3 9225 7163 41 CA DOKE BK 16 07113/17 2 10593 8211 39 CA • DMY BK 0 10117/13 1 11204 8680 44 CA SO BK 28 07113/17 STA # 2 = OMY WAS WENDED PACKING 11231' I-IRIGHT HAND RELEASE LATCH 11232' 7-58' X 4-12' TNV HBBP Wlk D = 4-0- 11237- 5-12' MLLOUT EX7BNSDN, D = 4.885' 11253' 41/2' PKR SW --SNP, 1 11275' 1 X 512' HYD LNR w / 11285 E Lw TT LOGCED 07/12191 1 11531' 1 MLLOUT WINDOW (P-04 L7) 11549'-11555- PERFORATION 1549'-11555' V 2-78' SLTD LW 8.16#, L-80 STL, .0058 bpf, D = 2.441' 1308T DATE REV BY I COMMENTS DATE REV BY COMMENTS 07112191 ALAI 2 INITIALCOMPLETION 1022113 ?/ RIC GLV Cl0 (10/17/13) 05/03110 NORDIC i SIDETRACKCOMPLE ION 05107/14 TBI GLV CC (05/02114) 06/16113 JTG1 PJC GLV CIO (06109113) 07/17/17 CRYJAD GLV CJO (07113/17) 06116/13 PJC P-04 8 PA4L1 LATERAL CRP 07/18/13 RK7/JLD GLV CIO (07104/13) 10116/13 L19PJC TREEClO(10111113) R3AHOE BAY Ll1T VALL: RD4 l Ll PERMIT W:`2000500 API W: 50-029-22180-60 SEC 31, T7IN, RBE, 2564' FSL 8 2301' PAL BP 6Kploradon (Alaska) lim VM3LFEAD= D-19.124' CMI ACTUATOR= TVD= 8800 SS PML KB. BF 91.64' BF. ELEV = 55.26' KOP= 1700' Max Angle - - ' --u D3t ��_ 07/13/17 Datum 6765 SAFE.. NOTES: WELL ANGLE' 70°@ _'. VAX DLS: @ _' — CHROME TOG 8 LNR GAS LFT MANDRILS ST MJ TVD TVD= 8800 SS TYPE VLV V4' CSG, 45.50, NT -a0 BUTT. D = 9.950• L' DATE 5 Minimum ID = _" SAFE.. NOTES: WELL ANGLE' 70°@ _'. VAX DLS: @ _' — CHROME TOG 8 LNR GAS LFT MANDRILS ST MJ TVD DEV TYPE VLV LATCH FORT DATE 5 3110 3010 37 CA DOME BK 12 07/13/17 4 6765 5456 50 CA DOME BK 16 07/13/17 3 9225 7163 41 CA DDM_ SK 16 07/13/17 2 10593 8211 39 CA • OMY SK 0 10/17/13 1 11204 8660 44 CA SO BK 28 07113/17 STA # 2 = DMY HAS EXT@D® PACKING 11� 4-12' PKR SVVS NP. D = 3.8• j7-518•X4-12•TiWH88PFKRD=4.o' 5-12.1MLLOUT wn3gsDN, D = 4.865' 4-1/7 PKR SVVS NIP. D = 3.813' TOP OF _ LNR Note: Refer to RoducbDn DB for hisbrtcal pert data SIZE STF 11260' 3.70• DEFLOY SLV. D = 3.00• OpnlSrg DATE SOZ 05/22/18 JM] BUILT PROPOS® 12 4-1R(RSWNNP, BEHIND 175' 2' MLLED = 3.80• (0427/00) CT LNR 7OPOF S12'LNi 112&1' 11284' 7-5/8•X5-12'HYOLNiwl TEBK SLV,D=7 4-12' TBG, 1=2.88, NT-13CR 7115. 11288' 11288' 4-/2' VYLEG, D= 3.958' .0152 bpf, D 3.958' 11286' ELMD TT LOGO>� 07/12191 4-12• PKR VNOPSTOCK(XX/XX/XX) 11620' MLLOUT WNDOW (P -04A) 11520'-11530' 5-12' LW 17#, NT13CR..0232 bpf, D= 4.892• -11620' 7-518' CSG, 29.7#, Nrw-HS NSCC• D = 6.875• -11620' D = 2.85• PERFORATION SIAIARY REF LOG: _ ON 10GXX/XX ANGLE AT TOP PERF '@— I Note: Refer to RoducbDn DB for hisbrtcal pert data SIZE STF MHTVAL OpnlSrg DATE SOZ 05/22/18 JM] BUILT PROPOS® FBTD .0758 bpf • D = 2.441 DATE REV BY I OORUNTS DATE REV BY COMMENTS 07112/01 A1D12 INITIAL COMPLETION 05103100 NDRDIC 1 SIDETRACK COMPLETION - _I_I_ CTD ST (P -04A) 05/22/18 JM] BUILT PROPOS® PRIAFDE BAY UNIT WT3L PL04A PBMT ND ATI ND: 50-029-22180-02 f11 R R13E 2564' FSL 8 2001' FWL BP ExpbTabon (Alaska) Well Bighole CDR2-AC 4 Ram BOP Schematic Date 21-NOV-17 Quick Test Sub to Otis 1.1 ft — Top of 7" Otis O.Oft --- —._._._ _ _–CDR2 Rig's Drip Pan Distances from top of riser Excluding quick -test sub Top of Annular 6.0 ft Top of Annular Element 6.7 ft Bottom Annular CL Blind/Shears 9.3 ft �1111" CL 2-3/8" Pipe/Slips B1 B2 Kill Line CL 2-3/8" x 3-1/2" VERB 12.6 ft CL 2-3/8" Pipe/Slips 13.4 ft CL of Top Swab 16.0 ft CL of Flow Cross 17.4 k CL of Master 18.8 ft LDS O LDS O Ground Level �— 7-1116" 5k Flange X 7" Otis Box drill 7 1116" Annular B3 I Swab T1 e T2 Master y■ IA U OA Choke Line Test Pump Hose TRANSMITTAL LETTER CHECKLIST WELL NAME: / PTD: Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: ✓!� POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL (If last two digits No. , API No. 50- _ Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150 - _ Well Name: PRUDHOE BAYUNIT P -04A Program DEV Well bore seg ❑ I PTD#:2181160 Company BP EXPLORATION !ALASKA) INC. Initial Class/Type PEND GeoArea 890 Unit 11850 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven. gas conforms to AS31.05.030Q.1.A),Q,2.A-D) - - ..... ..NA - - - - - - - - ------ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . . 1 Permit fee attached --.. ..... ................... NA ....... ---..-......-.---.--....--.--.. 2 Lease number appropriate .... - - - - Yes - - - - - Entire Well lies within ADL0028288. 3 Unique well name and number .. . . .. . . . . . . . . Yes - - - - - - - - - - - 4 Well located in a defined pool ... Yes .. . PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341F - - - - - - 5 Well located proper distance from drilling unit boundary- - - - - - - - - - - - - - - - - - - Yes - - - - CO 341F, Rule 2:. There shall be no restrictions as to well spacing. except that no pay shall be - 6 Well located proper distance from other wells - - - - - - Yes - opened in a well closer than 500 feet to -the boundary of theaffectedarea, Planned well conforms to - - - - - - 7 Sufficient acreage. available in drilling unit.. Yes CO 341 F, Rule 2. 8 If deviated, is. wellbore plat included - - - - - - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - 9 Operator only affected party - - Yes . 10 Operator hasappropriatebond in force - - - - - Yes - - - - - - - - Appr Date 11 Permit can be issued without conservation order.. Yes - - - 12 Permit can be issued without administrativeapproval- - - - - - - Yes - - - - - - - - - - - - SFD 9/28/2018 13 Can permit be approved before 15 -day -wait- - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - 14 Well located within area and strata authorized by Injection Order # (put. 10# in comments) (For NA - 15 All wellswithin1/4. mile area of review identified (For service well only) ... . . . ........ . NA 16 Pre -produced injector; duration of pre production less than 3 months (For service well only) _ - NA 18 ....... . . . . . . . . . . ........... - - .. Conductorstring.provided... - - NA -Conductor- - - set in PBU P,04- - - Engineering 19 Surface casing protects allknownUSDWs - - - - - - - - - - NA - Surface casing set in PBU P-04 - - 20 MT vol adequate to circulate on conductor & surfcsg ........... _ ... NA Surface casing set and fully cemented _ 21 CMT vola nate to tie-in long string to surf csg- - - - - - - - NA - - 22 CMT. will coverall knownproductivehorizons.. - - - - - - . - - - Yes Productive interval will be completed with. cemented production. liner and perforated 23 Casing designs adequate for C,. T, B &. permafrost- ........... Yes - - - - - - - 24 Adequate tankage. or reserve pit - - - - - - - - - - - - - - - - - - - Yes Rig has steel tanks; all waste to approved disposal wells 25 If a. re -drill, has. a 10-403 for abandonment been approved . . . . . . . ............. Yes . PTD 191. -076, -Sundry 318-373....... - - .... . 26 Adequate wellbore separafion proposed- - - - - - - - - - - - - - Yes Anti -collision analysis complete; no major risk failures - 27 If diverter required, does it meet regulations - - - - - - - - - - - NA - - - - - - - - - - - - - - - - - - - Appr Date 28 Drilling fluid program schematic ,& equip list adequate .. Yes Max fomtation pressure is $267 psig(7.05 ppg. EMW),' will drill w/ 8.6. ppg EMW - - - VTL 10/3/2018 29 BOPEs, do they meet. regulation . ............ - ... Yes - .... 30 BOPE press rating appropriate; test to (put psig in comments)- - - - - - Yes MPSP is 2389 psig; will test BOPS to 3500 psig - - - - - - - - - - 31 Choke manifold complies w/API RP -53 (May 84) - - - - - - Yes - - - - - - - - - - - - - - 32 Work will occur without operation shutdown... - . - - - - Yes 33 Is presence of H2S gas probable - - - - .. Yes - - - - H2S measures required - - - - 34 .Me-0anical.condition of wens within AOR verified (Forservice well only) - NA 35 Permit can be issued w/o hydrogen sulfide measures .... - - - - No - - - Drill. Site P. wells are H2S-bearing.. 112S measures are required, - - - - - Geology 36 Datapresentedon potential overpressure zones - - - - - - - - - - Yes .... Expected reservoir pressure is 7,1 ppg EMW; will be drilled using 8.6 ppgmud& coiled tubing. Appr Date 37 Seismic. analysis of shallow gas. zones - - - - - NA - - Planned mud weights are adequate to control the. operator's forecast of most likely pore pressures. SFD 9/28/2018 38 Seabed condition survey (if off -shore) - - - - - - - - - - - - - - - - - - - - NA - - - - - - 39 Contact name/phone for weekly. progress reports [exploratory only] . .. - - NA - - - - Geologic Engineering Public Date: ate Commissioner: DCommissioner: DC Date It